diff --git a/.github/workflows/deploy-pages.yml b/.github/workflows/deploy-pages.yml index 9af8c05..d651d89 100644 --- a/.github/workflows/deploy-pages.yml +++ b/.github/workflows/deploy-pages.yml @@ -27,6 +27,9 @@ jobs: cache-dependency-path: | requirements.txt requirements-rag.txt + - uses: actions/setup-node@949feb2413d6458794dcd2491c4babbbce0c15c1 # v7 + with: + node-version: "22" - name: Install test and RAG dependencies run: make install-rag - name: Run deterministic and RAG tests diff --git a/Processing/gmpp_pipeline.py b/Processing/gmpp_pipeline.py index 7c032ad..4bacca6 100644 --- a/Processing/gmpp_pipeline.py +++ b/Processing/gmpp_pipeline.py @@ -14,6 +14,7 @@ import json import math import re +import subprocess from collections import Counter, defaultdict from dataclasses import dataclass from datetime import datetime @@ -344,6 +345,57 @@ def day_delta(current: str | None, previous: str | None) -> int | None: return (datetime.fromisoformat(current) - datetime.fromisoformat(previous)).days +def _detect_claims_batch(inputs: list[dict[str, Any]]) -> list[dict[str, Any]]: + """Use the browser/CLI engine, with one Node process for the whole dataset.""" + script = """ +const fs = require("node:fs"); +const engine = require(process.argv[1]); +const inputs = JSON.parse(fs.readFileSync(0, "utf8")); +process.stdout.write(JSON.stringify(inputs.map(({ text, ...options }) => + engine.detectScheduleClaims(text, options)))); +""" + result = subprocess.run( + ["node", "-e", script, str(ROOT / "docs/engine/projectlens-engine.js")], + input=json.dumps(inputs), capture_output=True, text=True, check=True, timeout=60, + ) + return json.loads(result.stdout) + + +def detect_schedule_claims( + text: str, + current_finish: str | None, + previous_finish: str | None, +) -> dict[str, Any]: + """Evaluate a single narrative through the shared schedule engine.""" + return _detect_claims_batch([{ + "text": text, "currentFinish": current_finish, "previousFinish": previous_finish, + }])[0] + + +def annotate_history_claims(histories: list[list[dict[str, Any]]]) -> None: + records = [] + inputs = [] + for history in histories: + for index, record in enumerate(history): + previous = history[index - 1] if index else None + records.append(record) + inputs.append({ + "text": record.get("scheduleNarrative") or "", + "currentFinish": record.get("endDate"), + "previousFinish": previous.get("endDate") if previous else None, + }) + if not inputs: + return + for record, claims in zip(records, _detect_claims_batch(inputs), strict=True): + record["narrativeSaysUnchangedButMoved"] = claims["contradiction"] is not None + record["narrativeExcerpt"] = record.get("scheduleNarrative") or "" + record["narrativeClaimKind"] = ( + claims["contradiction"]["kind"] if claims["contradiction"] else None + ) + # Quieter "check the published date" note when the finish did not move. + record["publishedDateCheck"] = claims.get("publishedDateCheck") + + def rating_delta(current: str | None, previous: str | None) -> int | None: current_key = current.upper() if current else None previous_key = previous.upper() if previous else None @@ -398,6 +450,7 @@ def build_payload(records: list[dict[str, Any]]) -> dict[str, Any]: by_id[record["id"]].append(record) for history in by_id.values(): history.sort(key=lambda item: item["year"]) + annotate_history_claims(list(by_id.values())) projects = [] transitions = Counter() @@ -415,6 +468,12 @@ def build_payload(records: list[dict[str, Any]]) -> dict[str, Any]: transitions[status] += 1 theme_counts.update(current["themes"]) score, reasons = attention_score(current, previous) + if current.get("narrativeSaysUnchangedButMoved"): + reasons = [ + "Published commentary says the end date is unchanged while the published date moved", + *reasons, + ][:4] + score = min(100, score + 12) projects.append( { **current, @@ -427,6 +486,9 @@ def build_payload(records: list[dict[str, Any]]) -> dict[str, Any]: ), "attentionScore": score, "attentionReasons": reasons, + "narrativeSaysUnchangedButMoved": bool(current.get("narrativeSaysUnchangedButMoved")), + "narrativeExcerpt": current.get("narrativeExcerpt") or current.get("scheduleNarrative") or "", + "publishedDateCheck": current.get("publishedDateCheck"), } ) diff --git a/Processing/tests/test_claim_flag.py b/Processing/tests/test_claim_flag.py new file mode 100644 index 0000000..464d169 --- /dev/null +++ b/Processing/tests/test_claim_flag.py @@ -0,0 +1,131 @@ +"""GMPP narrative claim flag: unchanged wording while the published end date moved.""" + +from pathlib import Path + +from Processing.gmpp_pipeline import SOURCES, build_payload, detect_schedule_claims, load_year + + +ROOT = Path(__file__).resolve().parents[2] +RAW = ROOT / "Data" / "public" / "raw" + + +def test_capability_targets_do_not_claim_programme_closure_is_unchanged(): + for capability in [ + "initial operating capability", "initial operational capability", + "full operating capability", "full operational capability", + ]: + result = detect_schedule_claims( + f"The programme remains on track to deliver its {capability} in October 2028.", + "2030-04-30", "2032-04-30", + ) + assert result["stable"] == [] + assert result["contradiction"] is None + assert result["publishedDateCheck"] is None + + +def public_payload(): + records = [] + for year, source in SOURCES.items(): + records.extend(load_year(year, RAW / source["file"])) + return build_payload(records) + + +def test_wedgetail_and_istar_2025_26_are_flagged_but_2021_22_is_not(): + payload = public_payload() + by_id = {project["id"]: project for project in payload["projects"]} + + wedgetail = next(p for p in payload["projects"] if "WEDGETAIL" in p["name"].upper()) + istar = next(p for p in payload["projects"] if "ISTAR" in p["name"].upper()) + assert wedgetail["narrativeSaysUnchangedButMoved"] is True + assert istar["narrativeSaysUnchangedButMoved"] is True + assert wedgetail["narrativeExcerpt"] + assert istar["narrativeExcerpt"] + + # 2021→2022 Wedgetail stated the move ("increased from… Correction of published position"). + history = wedgetail["history"] + pair_2022 = next(item for item in history if item["year"] == 2022) + assert pair_2022["narrativeSaysUnchangedButMoved"] is False + + +def test_detect_schedule_claims_matches_tuning_cases(): + istar = detect_schedule_claims( + "Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 31/12/2027.", + "2033-05-02", + "2027-12-31", + ) + assert istar["contradiction"] is not None + + correction = detect_schedule_claims( + "Compared to 2021-Q4, the project end-date increased from 30 June 26 to 1 June 27 This is primarily due to the following factors: Correction of published position in March 21.", + "2027-06-01", + "2026-06-30", + ) + assert correction["contradiction"] is None + + +def test_stated_move_must_land_on_published_finish(): + # Round 2 N3: same answers as the JS engine for a mistargeted move and a direction-only one. + sentence = "the end date changed from 01/04/2027 to 30/09/2027 due to supplier delays" + miss = detect_schedule_claims(sentence, "2028-03-31", "2027-04-01") + assert miss["contradiction"] is not None + assert miss["contradiction"]["kind"] == "date-mismatch" + + near = detect_schedule_claims(sentence, "2027-10-05", "2027-04-01") + assert near["contradiction"] is None + + extended = "the end date was extended following re-planning" + later = detect_schedule_claims(extended, "2028-01-01", "2027-10-03") + assert later["contradiction"] is None + + earlier = detect_schedule_claims(extended, "2027-07-05", "2027-10-03") + assert earlier["contradiction"] is not None + assert earlier["contradiction"]["kind"] == "date-mismatch" + + +def test_end_date_scope_for_moves_and_stability(): + # Round 3 D2: contract-start moves and "unaffected" end-date claims mirror the JS engine. + narrative = ( + "The contract start date has moved back by four weeks. " + "The overall programme end date is unaffected." + ) + stable = detect_schedule_claims(narrative, "2028-06-30", "2028-06-30") + assert stable["contradiction"] is None + + moved = detect_schedule_claims(narrative, "2028-10-28", "2028-06-30") + assert moved["contradiction"] is not None + assert moved["contradiction"]["kind"] == "says-unchanged" + + lengthened = detect_schedule_claims( + "The end date has lengthened by 200 days.", + "2027-07-19", + "2026-12-31", + ) + assert lengthened["contradiction"] is None + + +def test_round4_programme_stability(): + for sentence in [ + "The programme remains on track.", "Compared to last year, the programme remains on track.", + "The project delivery remains on schedule.", "Delivery is on schedule.", + "The project is progressing to plan.", "The programme remains on course.", + "The project is on target to complete.", + ]: + result = detect_schedule_claims(sentence, "2026-12-27", "2026-06-30") + assert result["contradiction"]["kind"] == "says-unchanged" + for sentence in [ + "Phase 2 remains on track; the programme end date has moved to 31/03/2027.", + "The programme is not on track.", "The procurement is on schedule.", + "The programme's Phase 2 remains on track.", + "Milestones remain on track: Phase 1 March 2027, Phase 2 June 2027.", + ]: + assert detect_schedule_claims(sentence, "2027-03-31", "2026-06-30")["contradiction"] is None + assert detect_schedule_claims("Delivery is on schedule.", "2026-06-30", "2026-06-30")["contradiction"] is None + + +def test_stability_keeps_the_nearest_subject(): + for sentence in [ + "Phase 2 completion remains on track.", + "The programme's procurement completion is on schedule.", + "The contract end date is unchanged.", + ]: + assert detect_schedule_claims(sentence, "2027-03-31", "2026-06-30")["contradiction"] is None diff --git a/README.md b/README.md index 8cb74b9..ffd0efd 100644 --- a/README.md +++ b/README.md @@ -1,16 +1,34 @@ # ProjectLens -Compare a project update with its schedules, inspect what changed, and record the human review decision. +Give ProjectLens two schedule exports and the written progress update. It compares the finish dates with what the update says. -**For:** project managers, project controls reviewers and planners checking a submitted update against two Primavera P6 schedule exports. +**Input:** previous and current Primavera P6 XER or XML, or MS Project XML, plus an update pasted into a text file. -**Start here:** [Try ProjectLens](https://matthewpaver.github.io/ProjectLens/change-assurance.html). No install or account needed. +**Output:** finish movement, the exact sentence and highlighted phrase behind a finding, and both schedule dates. Findings prompt human review; they do not establish cause, entitlement or approval. Files stay local. -1. Select **Try the example project** (Northstar Grid Connection, a made-up project). Its finish moves by 73 days while the update says unchanged. -2. Inspect the source fields and review questions. Three findings are prioritised; all five remain available. -3. Record a decision with its owner and rationale, then download the evidence-linked record. +## Quick start -Northstar is synthetic. Checks cover supported schedule fields and narrative keywords; they do not establish cause, entitlement or approval. +With Node.js 18 or later, try the bundled synthetic Northstar exports and this example update: + +```bash +git clone https://github.com/MatthewPaver/ProjectLens.git +cd ProjectLens +cat > /tmp/projectlens-update.txt <<'TEXT' +The programme remains on track. +TEXT +node bin/projectlens.mjs compare \ + --previous examples/monthly/northstar-previous.xer \ + --current examples/monthly/northstar-current.xer \ + --narrative /tmp/projectlens-update.txt \ + --format text +# Exit 1: a 73-day finish move contradicts the update. +``` + +Replace the export paths and pasted text with your own files. [The guide](docs/USE_ON_YOUR_OWN_SCHEDULES.md) covers formats, batch comparisons and exit codes. + +**Accuracy:** set 4 is **28/30, seen**. Set 5's independent score is **pending**; no set 5 file is available here. Reproduce set 4 with `npm run bench` and inspect [the cases and source links](bench/real-cases/). Sets 1–4 informed these rules and do not measure unseen accuracy. + +**Browser:** [Try ProjectLens](https://matthewpaver.github.io/ProjectLens/change-assurance.html), then select **Try the example project** or use your own schedules. No install or account needed. The browser also records a human decision and its conditions. **Case study:** [The problem, review journey and before-and-after design](https://matthewpaver.github.io/work/projectlens/). @@ -31,20 +49,18 @@ ProjectLens gives the reviewer: - **A review tied to source facts.** Three prioritised questions, additional findings retained, and an explicit human decision. Rewording a narrative never removes factual constraint, relationship or float changes. - **A record of the decision.** The decision, its owner, rationale and conditions are kept; each condition stays open until it is marked closed. -## Quickstart +## Run the browser locally The browser tool is static HTML and JavaScript. Python's built-in server is enough: no packages, no API keys. ```bash -git clone https://github.com/MatthewPaver/ProjectLens.git -cd ProjectLens python3 -m http.server 8000 --bind 127.0.0.1 --directory docs # open http://127.0.0.1:8000/change-assurance.html and select "Try the example project" ``` Expected result: the evidence desk shows three prioritised findings and five total questions, including the 73-day finish movement, with source dates beside the selected finding. Stop the server with Ctrl+C. -**Your own schedules.** Export two single-project XER files from Primavera P6 (**File → Export → Primavera XER**): the comparison point and the latest submission. Select **Use your own schedules**, choose both files and paste the narrative. Files are parsed in the browser and never uploaded. If you have no XER to hand, use the synthetic [Northstar](https://matthewpaver.github.io/ProjectLens/demo/northstar-previous.xer) ([current](https://matthewpaver.github.io/ProjectLens/demo/northstar-current.xer)) or [Riverside](https://matthewpaver.github.io/ProjectLens/demo/riverside-previous.xer) ([current](https://matthewpaver.github.io/ProjectLens/demo/riverside-current.xer), [narrative](https://matthewpaver.github.io/ProjectLens/demo/riverside-narrative.txt)) pairs. +**Your own schedules.** See [`docs/USE_ON_YOUR_OWN_SCHEDULES.md`](docs/USE_ON_YOUR_OWN_SCHEDULES.md) for browser, CLI and monthly batch routes (XER, P6 XML, MS Project XML, and `.txt` / `.md` / `.docx` narratives). Files stay local. If you have no schedule to hand, use the synthetic [Northstar](https://matthewpaver.github.io/ProjectLens/demo/northstar-previous.xer) ([current](https://matthewpaver.github.io/ProjectLens/demo/northstar-current.xer)) or [Riverside](https://matthewpaver.github.io/ProjectLens/demo/riverside-previous.xer) ([current](https://matthewpaver.github.io/ProjectLens/demo/riverside-current.xer), [narrative](https://matthewpaver.github.io/ProjectLens/demo/riverside-narrative.txt)) pairs. ## Guided review @@ -83,7 +99,7 @@ The evidence desk puts three prioritised findings (with any additional findings **Save draft on this device** deliberately stores both XER contents, narrative and decision fields in browser storage. Save again after further edits; use **Resume saved draft** after reopening, and **Delete saved draft** when finished. Anyone with access to this browser profile may access that stored data. Normal review processing uploads nothing. Browser storage is not a shared or tamper-proof audit system. -Project names and source IDs must match. Identical evidence and reversed data dates are rejected. Missing activity finish or float fields produce an evidence gap. Renamed or re-imported projects need exports with consistent identity before comparison. The narrative checks are bounded keyword heuristics with local negation handling, not semantic understanding; factual changes persist independently of narrative wording; this is not critical-path, causation, entitlement or contractual approval analysis. Validate on representative real exports before operational use. +Identical evidence and reversed data dates are rejected. Missing activity finish or float fields produce an evidence gap. The browser asks for confirmation when renamed projects share activity codes; the CLI assumes the supplied pair is intended. The narrative checks use deterministic phrase and date rules with local negation handling, not semantic understanding. Factual changes persist independently of narrative wording. Validate on representative real exports before operational use. ## Results @@ -112,7 +128,7 @@ What it does not show: 8 author-written queries are a smoke test, not a benchmar ## Design decisions and trade-offs - **Browser-local comparison, not a hosted platform.** Schedule submissions are commercially sensitive, so XER files, decisions and conditions never leave the machine, and a reviewer can try it on a real pack with no install, account or data-sharing approval. The cost: records live in one browser's local storage, with no multi-user working, permissions or organisational audit log. -- **Deterministic rules for schedule findings, not a language model reading the schedule.** Finish movement against the narrative, constraint, logic and float changes, and responses with no owner are calculated in code, so the same pack always gives the same blockers and each one traces to a field. The cost: it finds only what the rules encode, and it reads XER and CSV only. +- **Deterministic rules for schedule findings, not a language model reading the schedule.** Finish movement against the narrative, constraint, logic and float changes, and responses with no owner are calculated in code, so the same pack always gives the same blockers and each one traces to a field. The cost: it finds only what the rules encode and needs a supported export format. - **Retrieval is an opt-in sidecar with no localhost probe.** The static site never tries to reach a local server, so the default page makes no failed requests and needs no key. The cost: live precedent retrieval needs a local setup step and an explicit URL. - **Generated text fails closed and the human decides.** A brief with an invalid or missing citation, or one that recommends approving or rejecting, is dropped rather than shown with a warning. Each precedent still needs **Use** or **Ignore** before the decision register. The cost: some useful briefs are discarded. - **A reproducible offline eval alongside the live one.** The hashing-embedder baseline runs in CI with no key and cannot drift silently. The alternative, publishing only a Gemini number, could not be reproduced by a reader without a key. The cost: the published number is a lexical floor, not the production path. @@ -121,7 +137,7 @@ What it does not show: 8 author-written queries are a smoke test, not a benchmar - Findings prompt human verification. ProjectLens does not establish contractual entitlement, delay causation or a probability of failure, and it does not reproduce Primavera scheduling calculations. - It does not make the decision. The workflow ends by recording a human decision with its rationale and conditions. -- It reads Primavera P6 XER and CSV only, not Microsoft Project or PDF. Change assurance rejects multi-project XER files; schedule review analyses the first project and says so. +- It reads Primavera P6 XER/XML and MS Project XML, not binary `.mpp` files or PDF narratives. The CLI accepts `.txt` and `.md` updates; the browser schedule-review page also reads `.docx`. The browser asks which project to use in a multi-project XER; the CLI needs `--project `. - XER does not reliably carry baseline data (see Oracle's [XER export notes](https://docs.oracle.com/cd/E75426_01/English/User_Guides/p6_pro_user/export_projects_to_an_xer_file.htm)), so baseline assurance needs a separately supplied baseline. Risk and decision links use explicit activity-code matching. - GMPP delivery-confidence ratings are point-in-time judgements, not outcomes. Annual data cannot support activity-level forecasting, and a project's absence from a later release does not show whether it delivered. - Precedent relevance is a ranking signal, not a confidence or outcome claim. Public records show status, not which intervention worked. @@ -159,7 +175,7 @@ make browser-test # Playwright journeys on desktop and mobile layouts make public-data # rebuild docs/data/gmpp.json from Data/public/raw/ ``` -Both suites run in [`deploy-pages.yml`](.github/workflows/deploy-pages.yml) before every deploy. Python 3.11. Browser tests need only `requirements-browser.txt`; screenshots go to `/tmp/projectlens-browser` unless `PROJECTLENS_SCREENSHOT_DIR` is set. +Both suites run in [`deploy-pages.yml`](.github/workflows/deploy-pages.yml) before every deploy. Python 3.11 and Node.js 18 or later. The GMPP pipeline uses the shared JavaScript claim engine; Node is required for `make public-data` and the Python claim tests. Browser tests need only `requirements-browser.txt`; screenshots go to `/tmp/projectlens-browser` unless `PROJECTLENS_SCREENSHOT_DIR` is set. ## Licence diff --git a/bench/real-cases/SOURCES.md b/bench/real-cases/SOURCES.md new file mode 100644 index 0000000..f01baa1 --- /dev/null +++ b/bench/real-cases/SOURCES.md @@ -0,0 +1,1108 @@ +# Held-out test sets: sources and method + +Built 29 October 2026. These two sets score the fixes that another agent is making to PolicyLens and ProjectLens. **Do not show them to the tuning agent, and do not copy them into either repo or into `research_notes/`.** Neither tool was run on them. + +| File | Cases | Labels | +|---|---|---| +| `policylens-heldout.json` | 15 (5 real, 10 modelled) | 11 stop, 1 review, 3 pass | +| `projectlens-heldout.json` | 32 (all real) | 8 contradiction, 14 explained, 10 no-move | + +## How tuning cases were excluded + +- **PolicyLens.** I read `research_notes/Real case tests/policylens-inputs/cases.js` (C01–C20). The held-out set leaves out every managed policy used there (AWSSupportServiceRolePolicy, PowerUserAccess) and every Rhino method used there (CreatePolicyVersion, PassRole+EC2, PassRole+Lambda, AttachUserPolicy/PutUserPolicy, UpdateAssumeRolePolicy, AssumeRole widening). It also avoids the tuning set's doc-example shapes: MFA removal, SourceIp removal, PrincipalOrgID removal, a public bucket, a principal *replaced* by an external one, and KMS widening. +- **ProjectLens.** The set uses no 2025-26 pairs. It also excludes: + - the 6 earlier-year pairs exported to `projectlens-inputs/gmpp-xer/`: MOD_0079 2024-25, MOD_0104 2024-25, MOD_0110 2020-21, MOD_0119 2023-24, MOD_0125 2023-24, MOD_0137 2023-24; + - every pair named in `projectlens.md` or `plans/projectlens-lift-and-shift.md`: Armed Forces Recruiting 2023-24, New Medium Helicopter 2023-24, Armour MBT 2024-25, ECRS Mk2 2023-24, Protector 2020-21, Grenfell 2024-25, HO Biometrics 2021-22, Making Tax Digital 2024-25, Midlands Rail Hub 2023-24, E-7 Wedgetail 2021-22, and Social Housing Decarbonisation Fund 2024-25 (its 2024-25 narrative is discussed in the notes). + + 27 of the 32 pairs are not in `gmpp_pairs.json` at all, because they are projects that left the GMPP before 2025-26. The other 5 (B02–B05, B07) are earlier-year rows of that file, each marked `inTuningPairsFile: true`. The tuning harness ran every row of `gmpp_pairs.json` through the engine as a bulk statistic but did not hand-label them. Exclude those 5 if a stricter holdout is wanted. Doing so leaves only 3 contradictions, because this kind of conflict is rare outside the MOD template rows. + +--- + +## Set A: PolicyLens (`policylens-heldout.json`) + +### What `expect.status` means + +Each label is decided by IAM evaluation semantics, not by what the tool currently does: + +- **stop**: the change makes at least one request go ImplicitDeny or ExplicitDeny → Allow, and the newly allowed access is high-risk according to the cited source: a privilege-escalation path (Rhino), data read on all resources, cross-account or any-principal access, a destructive action outside its previous scope, or a removed guard condition. +- **review**: something is newly allowed, but only under condition keys whose values are not in the policy (for example resource or principal tags), so the outcome needs context. +- **pass**: no request is newly allowed. The change only narrows, rolls back, adds Deny actions, or rewrites wildcards as explicit actions that the old wildcards already covered. + +`before` and `after` are plain IAM policy JSON. For the MAMIP cases they are the `PolicyVersion.Document` objects, unchanged. Account IDs (111122223333, 444455556666, 555555555555, 123456789012) are AWS documentation placeholders. `principal` is the identity the policy is attached to (identity policies) or the requester to consider (trust and bucket policies). + +### Real AWS managed-policy changes (MAMIP, now `zoph-io/IAMTrail`) + +History came from a bare clone of `https://github.com/zoph-io/IAMTrail` (MAMIP redirects there). Each file is `aws iam get-policy-version` output. + +| ID | Policy and version change | Before commit → after commit | Expect | +|---|---|---|---| +| A01 | AdministratorAccess-Amplify v1 → v2 (2021-01-14) | `d24b16d1` → `937690cd` | stop | +| A02 | ConsoleViewOnlyAccessFromVercel v5 → v6 (2026-10-08) | `f5e28b7b` → `1e6a27c1` | stop | +| A03 | AmazonMacieServiceRolePolicy v3 → v4 (2020-07-17) | `9384f06c` → `e29851e0` | pass | +| A04 | AWSCompromisedKeyQuarantineV2 v4 → v5 (2024-10-02) | `aafbae9e` → `9621e9a5` | pass | +| A05 | AmazonS3TablesFullAccess v2 → v1, a default-version rollback (2025-11-24) | `bb3a7ba5` → `48415f2c` | pass | + +The JSON holds the full commit hashes and URLs. A03 is a deliberate false-positive test: the text gains `s3:GetObject`, but v3 already allowed `s3:Get*` on `*`. I checked mechanically that every v4 action/resource pair is covered by a v3 pattern under the same (absent) condition, and that statements 2 and 3 are byte-identical. + +### Rhino Security Labs privilege escalation (modelled) + +Source: (Gietzen). Rhino publishes permission sets, not policies, so before/after are minimal modelled identity policies. + +| ID | Rhino method | Added permission | +|---|---|---| +| A06 | 2 | `iam:SetDefaultPolicyVersion` on `policy/*` | +| A07 | 4 | `iam:CreateAccessKey` widened from `user/${aws:username}` to `user/*`. Before is AWS's `CreateOwnAccessKeys` example from [access-keys_required-permissions](https://docs.aws.amazon.com/IAM/latest/UserGuide/access-keys_required-permissions.html). | +| A08 | 13 | `iam:AddUserToGroup` on `group/*` | +| A09 | 18 | `glue:CreateDevEndpoint` + `iam:PassRole` on `*` | +| A10 | 17 | `lambda:UpdateFunctionCode` on `function:*` | + +### AWS documentation examples turned into edits (modelled) + +| ID | Base example | Edit | Expect | +|---|---|---|---| +| A11 | [Confused deputy](https://docs.aws.amazon.com/IAM/latest/UserGuide/confused-deputy.html) trust policy (Example Corp + `sts:ExternalId`) | Principal → `{"AWS": "*"}`, condition removed | stop | +| A12 | [S3 bucket policy examples](https://docs.aws.amazon.com/AmazonS3/latest/userguide/example-bucket-policies.html), tag-based read | Adds GetObject + ListBucket for account `444455556666` (short form) | stop | +| A13 | Same page, tag-based read + "Restrict access to only HTTPS requests" | `aws:SecureTransport` Deny removed | stop (doubt noted) | +| A14 | [EC2: start or stop instances based on tags](https://docs.aws.amazon.com/IAM/latest/UserGuide/reference_policies_examples_ec2-start-stop-tags.html) | New statement: `ec2:TerminateInstances` on `instance/*` with no tag condition | stop | +| A15 | Same | `ec2:TerminateInstances` added inside the tag-conditioned statement | review (doubt noted) | + +Supporting references: + +- [IAM policy evaluation logic](https://docs.aws.amazon.com/IAM/latest/UserGuide/reference_policies_evaluation-logic.html) +- [Principal element](https://docs.aws.amazon.com/IAM/latest/UserGuide/reference_policies_elements_principal.html): AWS strongly recommends against `*` with Allow, "especially" in role trust policies. An account ID delegates to the whole account. +- [Action element](https://docs.aws.amazon.com/IAM/latest/UserGuide/reference_policies_elements_action.html) +- [Job-function policies](https://docs.aws.amazon.com/IAM/latest/UserGuide/access_policies_job-functions.html): view-only excludes resource content; ReadOnlyAccess reads data. +- [Security Hub S3 controls](https://docs.aws.amazon.com/securityhub/latest/userguide/s3-controls.html): S3.5 requires TLS (Medium); S3.6 restricts access from other accounts (High). +- [aws:CalledVia](https://docs.aws.amazon.com/IAM/latest/UserGuide/reference_policies_condition-keys.html#condition-keys-calledvia) + +### Doubts (Set A) + +- **A13**: stop vs review. The principals don't change; only the transport guard is removed. I labelled it stop for consistency with other guard removals (a decision goes ExplicitDeny → Allow). +- **A15**: review vs stop. It adds a destructive action, but only inside the existing tag boundary. +- **A02**: AWS made this change deliberately. By IAM semantics, though, it newly allows reading all S3, S3 Tables and S3 Vectors data from a policy named "ViewOnly". + +--- + +## Set B: ProjectLens (`projectlens-heldout.json`) + +### Data (Open Government Licence v3.0) + +Contains public sector information licensed under the [Open Government Licence v3.0](https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/). + +| Release | Publication | CSV | +|---|---|---| +| 2019-20 (data at 30 Sep 2019) | [IPA Annual Report 2020](https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2020) | | +| 2020-21 (31 Mar 2021) | [IPA Annual Report 2021](https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021) | | +| 2021-22 (31 Mar 2022) | [IPA Annual Report 2022](https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022) | | +| 2022-23 (31 Mar 2023) | [IPA Annual Report 2022-23](https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23) | | +| 2023-24 (31 Mar 2024) | [IPA Annual Report 2023-24](https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24) | | +| 2024-25 (31 Mar 2025) | [NISTA Annual Report 2024-25](https://www.gov.uk/government/publications/nista-annual-report-2024-2025) | | + +I found the asset URLs through the gov.uk Content API and downloaded them on 29 Oct 2026. The SHA-1 of each download matches the file of the same release in `ProjectLens/Data/public/raw/` (the files the tuning harness used): `da07700f`, `6acc418d`, `cb61c177`, `200870d3`, `d31efcee`, `5cd0551b`. + +### Method + +1. **Parse.** I parsed each CSV myself. The 2019-20 file has projects in columns, so I transposed it. The 2019-20 and 2020-21 files are Windows-1252; the others are UTF-8. Records are joined on the upper-cased GMPP ID. +2. **Dates.** `prevEnd` and `curEnd` are the "Project - End Date (Latest Approved End Date)" / "End Date" column. 2024-25 rows with Low/Mid/High ranges or exemption text have no usable date and were not used. +3. **Narrative.** `narrative` is the current-year schedule-narrative cell, verbatim. I checked by machine that all 32 strings appear exactly in the source CSV text. +4. **Labels.** I read every narrative myself. Rules are in `meta.labelRules`. Every no-move case has `daysMoved` = 0. `contradictionType` records which rule applies: `claims-unchanged` (B01–B05) or `names-different-date` (B06–B08). +5. **Year convention.** `prevYear`/`year` follow `gmpp.json` (year N = release with data at 31 March N). `prevRelease`/`release` give the human-readable label. + +Coverage: 7 pairs from 2019-20 → 2020-21, 6 from 2020-21 → 2021-22, 4 from 2021-22 → 2022-23, 10 from 2022-23 → 2023-24, 5 from 2023-24 → 2024-25. + +### Doubts (Set B) + +- **Clean contradictions:** B01 (MOJ prison places, "remained static"), B03 (Armour MBT 2023-24) and B04 (Collective Training 2023-24). +- **B02 and B05** say "remained scheduled" but also mention revised milestones (B02) or a pending reset schedule (B05). +- **B06–B08** state *a* change, but to a date more than 14 days from the published one: + - B06 says "Q4 23/24" against a published date of Jan 2025; + - B07 says 25 Sep 2029 against 22 Mar 2030; + - B08 says 30 Jun 2025 against 30 Jun 2024, probably a typo in the column. + + These are contradictions only under the "names a different date" rule. A scorer may want to report B01–B05 and B06–B08 separately. +- **False-positive no-move cases.** Four narratives claim a move that the published dates do not show: B25 ("increased from 31 March 2020"), B26 ("extended until January 2023"), B27 ("end date has been delayed") and B28 ("changed by 15 weeks"). The finish did not move, so they are no-move, but a tool reading only the narrative might flag them. +- **Wrong "from" date.** B13 and B14 name another date (a contract-exit milestone, a forecast) besides the approved end date. B20 and B21 state the move with a "from" date that differs from the published previous date. All four are labelled explained. +- **Left out as ambiguous:** ONS Census 2023-24 (the template states the decrease, then says "remains unchanged") and FCASW 2024-25 (the template names a wrong date, then the text says "delay to 2043"). + +--- + +# Second held-out sets (built 29 Oct 2026, after the first sets were scored) + +| File | Cases | Labels | +|---|---|---| +| `policylens-heldout2.json` | 15 (5 real, 10 modelled) | 11 stop, 4 pass | +| `projectlens-heldout2.json` | 35 (all real) | 13 contradiction, 12 explained, 10 no-move | + +Same formats and label rules as the first sets. Neither tool was run on them. + +## Exclusions + +- Nothing here appears in the tuning files or in the first held-out sets. +- **PolicyLens:** + - none of the managed policies from tuning or set 1 is reused; + - none of the Rhino methods from tuning or set 1 is reused; + - no edit shape is repeated. Set 2's guardrail is a Region deny, not SecureTransport. Its cross-account grant is a KMS key policy, not a bucket policy. +- **ProjectLens:** all pairs come from release transitions not used before (2016-17 → 2017-18, 2017-18 → 2018-19, 2018-19 → 2019-20). None is in `gmpp_pairs.json`, whose earliest pair starts at 2019-20. Two projects reappear from set 1, but in different pairs: Priority School Building Programme 2 (DFE_0006) and 5G Testbeds & Trials (DCMS_0011). + +## Set A2: PolicyLens (`policylens-heldout2.json`) + +### Real MAMIP / IAMTrail managed-policy changes + +| ID | Policy and version change | Commits | Expect | +|---|---|---|---| +| A01 | AWSFaultInjectionSimulatorSSMAccess v1 → v2 (2023-06-02): `ssm:SendCommand` on `instance/*` + `document/*` | `3884a4c4` → `173745fc` | stop | +| A02 | AmazonRDSPerformanceInsightsReadOnly v2 → v3 (2023-10-23): Sids only | `b0ac8557` → `43e8956d` | pass | +| A03 | SageMakerStudioUserIAMConsolePolicy v2 → v3 (2025-11-17): conditioned PassRole removed | `c306031d` → `fcf21967` | pass | +| A04 | NeptuneFullAccess v3 → v4 (2020-02-13): unconditioned PassRole replaced by one limited to `iam:PassedToService` = rds | `49aa1d03` → `979724dc` | pass | +| A05 | AmazonEventBridgeApiDestinationsServiceRolePolicy v2 → v3 (2025-05-29): `aws:ResourceAccount` condition added | `280fd158` → `6f6bafcf` | pass | + +The JSON holds full hashes and URLs. A04 and A05 are false-positive tests: their text diffs show PassRole or GetSecretValue statements "added", but the change narrows access. I found them by checking every IAMTrail transition for after-grants already covered by the before policy, then read each one by hand. A04's resource edit (`arn:aws:rds:*` → `arn:aws:rds:*:*:*`) is equal or narrower: the [Resource element doc](https://docs.aws.amazon.com/IAM/latest/UserGuide/reference_policies_elements_resource.html) says a trailing `*` in a segment "can expand to match beyond the colon boundaries". + +### Rhino privilege escalation (modelled) + +| ID | Method | Added permission | +|---|---|---| +| A06 | 5 | `iam:CreateLoginProfile` on `user/*` | +| A07 | 6 | Self-service `iam:UpdateLoginProfile`/`ChangePassword` widened from `user/${aws:username}` to `user/*` | +| A08 | 8 | `iam:AttachGroupPolicy` on the principal's own group (`context.groupMembership` given) | +| A09 | 11 | `iam:PutGroupPolicy` on `group/*` | +| A10 | 20 | `iam:PassRole` on `*` next to an existing `cloudformation:CreateStack` | +| A11 | Part 2, Lambda layers | `lambda:UpdateFunctionConfiguration` on `function:*` | + +Sources: + +- Part 1: +- Part 2: +- A11 caveat: + +### AWS documentation examples turned into edits (modelled) + +| ID | Base example | Edit | Expect | +|---|---|---|---| +| A12 | [KMS: allowing users in other accounts to use a KMS key](https://docs.aws.amazon.com/kms/latest/developerguide/key-policy-modifying-external-accounts.html) + default key policy | Adds the doc's external-account statement for 444455556666 | stop | +| A13 | [SQS basic policy examples](https://docs.aws.amazon.com/AWSSimpleQueueService/latest/SQSDeveloperGuide/sqs-basic-examples-of-sqs-policies.html), Example 1 | Adds Example 5's anonymous `sqs:ReceiveMessage` | stop | +| A14 | [EventBridge Scheduler confused-deputy prevention](https://docs.aws.amazon.com/scheduler/latest/UserGuide/cross-service-confused-deputy-prevention.html) | `aws:SourceAccount` + `aws:SourceArn` removed from the trust policy | stop (doubt) | +| A15 | [IAM: deny access based on the requested Region](https://docs.aws.amazon.com/IAM/latest/UserGuide/reference_policies_examples_aws_deny-requested-region.html) | Region deny removed next to an `ec2:*` grant | stop (doubt) | + +### Doubts (Set A2) + +- **A11:** exploitability depends on the runtime and libraries. +- **A14:** the service's own PassRole checks limit real exploitation. +- **A15:** a governance guardrail, so arguably review. +- **No review case:** set 2 has none, so the middle category is untested. + +## Set B2: ProjectLens (`projectlens-heldout2.json`) + +### Data (Open Government Licence v3.0) + +Contains public sector information licensed under the [Open Government Licence v3.0](https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/). + +| Release | Publication | CSV | SHA-1 | +|---|---|---|---| +| 2016-17 (data at 30 Sep 2016) | [IPA Annual Report 2017](https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2017) | | `df561450` | +| 2017-18 (30 Sep 2017) | [IPA Annual Report 2018](https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2018) | | `f0e13496` | +| 2018-19 (30 Sep 2018) | [IPA Annual Report 2019](https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2019) | | `43f0cbba` | +| 2019-20 (30 Sep 2019) | [IPA Annual Report 2020](https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2020) | same file as Set B | `da07700f` | + +All four are transposed (projects in columns) and Windows-1252 encoded. I found the URLs through the gov.uk Content API and downloaded them on 29 Oct 2026. + +### Method + +1. **Matching.** Releases before 2019-20 publish no GMPP ID. I joined pairs on the exact project name (lower-cased, punctuation stripped), and only where the name is unique in both releases. I checked each pair's department and narrative by hand. `gmppId` is filled where 2019-20 publishes it for the same name; `gmppIdSource` says which. +2. **Dates.** Dates are parsed from the End Date row (`dd/mm/yy` and `dd/mm/yyyy` both occur). The raw strings are kept in `prevEndAsPublished`/`curEndAsPublished`. +3. **Narratives.** All 35 narratives are checked verbatim against the source CSV text. +4. **Coverage.** 11 pairs from 2016-17 → 2017-18, 10 from 2017-18 → 2018-19, 14 from 2018-19 → 2019-20. Departments: MOD 9, DfT 4, BEIS 3, MoJ 4, DWP 2, DHSC 2, CO 2, DfE 3, HO 2, DCMS 2, DEFRA 1, HMRC 1. +5. **New `contradictionType`.** Before 2019-20 there is no "end-date increased/remained" template, so most contradictions are stability claims rather than explicit "unchanged" sentences. I added `claims-on-track` for "on track", "on schedule" or "on time" with no move stated. The tuning paraphrase suite treated these as stability claims. Split: 2 `claims-unchanged`, 9 `claims-on-track`, 2 `names-different-date`. + +### Doubts (Set B2) + +- **Clearest contradictions:** B01 (Polar Research Vessel, "on track to deliver to its agreed schedule"), B02 (Automatic Enrolment), B07 (Prison Estate Transformation, "remains on schedule"), B11 (Clyde, "2032 ... date remains extant" against a previous published date of 2024). +- **Weaker `claims-on-track` cases** (stability claim about something other than the end date): B05 (migration milestone, Aug 2020), B08 (procurements on schedule), B09 (milestones on time; migration Dec 2023), B06 ("current schedule"). Exclude `claims-on-track` if the scorer's rule is strictly "says unchanged". +- **B04:** a 15-day move, one day over the threshold. +- **B12 and B13** name a wrong current date: CEPP "01/12/26" against 31/12/2030; PSBP2 "Q1 24-25" against 25/02/2025. +- **Weak explained cases:** B16–B18 state delays or a reapproval but not the new end date. B15 says "extended to 30 September 2018" when the published date moved earlier. +- **No-move cases where the narrative claims a later date than the column:** B33 (5G: "is 31/03/22, has changed") and B34 (HMCTS FM: "now July 2020"). They are no-move because the finish did not move. + +--- + +# Section 3: third held-out sets (built 29 Oct 2026, after sets 1 and 2 shaped fixes) + +| File | Cases | Labels | +|---|---|---| +| `policylens-heldout3.json` | 15 (5 real, 10 modelled) | 8 stop, 4 review, 3 pass | +| `projectlens-heldout3.json` | 35 (all real) | 13 contradiction, 10 explained, 6 no-move, 6 published-date-check | + +Same formats and rules as before. ProjectLens adds one label: **`published-date-check`**, used when the published end date did not move but the narrative names a current end date more than 14 days away. Neither tool was run. + +## Exclusions + +- **PolicyLens:** + - no managed policy, Rhino method or edit shape from tuning or sets 1–2 is reused; + - A11 removes a DynamoDB LeadingKeys condition, which is not the tuning set's table widening; + - A13 is a same-account kms:ViaService grant, which is not tuning's Decrypt widening or set 2's cross-account key policy. +- **ProjectLens:** + - 34 of the 35 pairs come from transitions never used before: 2013-14 → 2014-15, 2014-15 → 2015-16 and 2015-16 → 2016-17. I read "2014-15 to 2016-17" as the current release falling in that range; + - the 35th pair is MHCLG_0002 2020-21 → 2021-22, which is not in sets 1–2 and is flagged `inTuningFile: false` in my pair index; + - no pair (project + release) repeats sets 1 or 2, and no project in set 3 appears in sets 1 or 2. I checked both by machine. + +## Set A3: PolicyLens (`policylens-heldout3.json`) + +### Real MAMIP / IAMTrail changes + +| ID | Policy and version change | Commits | Expect | +|---|---|---|---| +| A01 | AWSDataExchangeSubscriberFullAccess v2 → v3 (2021-01-14): `aws:CalledVia` added to the GetObject statement | `221b65e4` → `c7ab4162` | pass | +| A02 | AWSCodePipelineFullAccess v5 → v6 (2019-06-10): CreateBucket/PutBucketPolicy narrowed from `*` to `codepipeline-*` | `ad4c2e8f` → `c7144158` | pass | +| A03 | AWSCloudTrail_FullAccess v2 → v1 (2020-10-22): rollback removing a DynamoDB list statement | `7ca1fdf1` → `6200b07e` | pass | +| A04 | AWSBackupOperatorAccess v4 → v5 (2020-09-15): `ssm:SendCommand`, but only with the `AWSEC2-CreateVssSnapshot` document | `94c502a5` → `e8d0ab12` | review | +| A05 | AWSIAMIdentityCenterAllowListForIdentityContext v1 → v2 (2023-11-25): Deny-NotAction allow-list gains `s3:GetDataAccess` and `s3:GetAccessGrantsInstanceForPrefix` | `ea6b5575` → `3be8f3a5` | review | + +### Modelled from AWS docs or Rhino + +| ID | Base | Edit | Expect | +|---|---|---|---| +| A06 | [ECR repository policy examples](https://docs.aws.amazon.com/AmazonECR/latest/userguide/repository-policy-examples.html) | AllowPull principal changed to `*` | stop | +| A07 | [Lambda cross-account access](https://docs.aws.amazon.com/lambda/latest/dg/permissions-function-cross-account.html) | Invoke principal changed to `*` | stop | +| A08 | [Secrets Manager cross-account](https://docs.aws.amazon.com/secretsmanager/latest/userguide/auth-and-access_examples_cross.html) | Adds `secretsmanager:PutResourcePolicy` for the external role (doc warns it escalates) | stop | +| A09 | [Run Command tag-based access](https://docs.aws.amazon.com/systems-manager/latest/userguide/run-command-setting-up.html#tag-based-access) | `ssm:SendCommand` with any document, on Finance=WebServers instances only | review | +| A10 | [ECS Exec, limiting access](https://docs.aws.amazon.com/AmazonECS/latest/developerguide/ecs-exec.html) | `ecs:ExecuteCommand` condition and scope removed | stop | +| A11 | [DynamoDB item-level access](https://docs.aws.amazon.com/IAM/latest/UserGuide/reference_policies_examples_dynamodb_items.html) | `dynamodb:LeadingKeys` condition removed | stop | +| A12 | SQS (modelled) | ReceiveMessage/DeleteMessage on every queue | stop | +| A13 | [KMS kms:CallerAccount + kms:ViaService example](https://docs.aws.amazon.com/kms/latest/developerguide/conditions-kms.html) | `Principal *` statement limited to EBS in-account | review | +| A14 | [Condition operators: …IfExists](https://docs.aws.amazon.com/IAM/latest/UserGuide/reference_policies_elements_condition_operators.html#Conditions_IfExists) | `Bool` → `BoolIfExists` on `aws:MultiFactorAuthPresent` for `iam:*` | stop | +| A15 | [Rhino part 2](https://rhinosecuritylabs.com/aws/aws-privilege-escalation-methods-mitigation-part-2/) | `sagemaker:CreatePresignedNotebookInstanceUrl` on `notebook-instance/*` | stop | + +### Doubts (Set A3) + +- **All four review cases** (A04, A05, A09, A13) could move one step either way: + - A04: a fixed AWS document on every instance; + - A05: this document alone grants nothing; + - A09: arbitrary commands on the tagged fleet; + - A13: the AWS-managed EBS key pattern. +- **A14:** BoolIfExists is sometimes chosen on purpose to allow CLI access keys. + +## Set B3: ProjectLens (`projectlens-heldout3.json`) + +### Data (Open Government Licence v3.0) + +Contains public sector information licensed under the [Open Government Licence v3.0](https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/). + +| Release | Publication | CSV | SHA-1 | +|---|---|---|---| +| 2013-14 (data at 30 Sep 2013) | [MPA Annual Report 2014](https://www.gov.uk/government/publications/major-projects-authority-annual-report-2014) | | `46f0e8e5` | +| 2014-15 (30 Sep 2014) | [MPA Annual Report 2015](https://www.gov.uk/government/publications/major-projects-authority-annual-report-2015) | | `bffebe15` | +| 2015-16 (30 Sep 2015) | [IPA Annual Report 2016](https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2016) | | `391f49e3` | +| 2016-17 (30 Sep 2016) | [IPA Annual Report 2017](https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2017) | as in Section 2 | `df561450` | +| 2020-21 / 2021-22 | as in Set B | as in Set B | `6acc418d` / `cb61c177` | + +The pre-2019-20 files are transposed and Windows-1252 encoded. I downloaded them on 29 Oct 2026 through the gov.uk Content API. + +### Method + +1. **Matching.** Pairs are joined on the exact project name (normalised), only where unique in both releases. MHCLG_0002 is joined on its GMPP ID. +2. **Narratives.** All 35 are checked verbatim against the source CSVs. +3. **Coverage.** 12 pairs from 2013-14 → 2014-15, 7 from 2014-15 → 2015-16, 15 from 2015-16 → 2016-17, 1 from 2020-21 → 2021-22. +4. **Departments.** MoD, DfT, DH/DoH, HO, MoJ, CO, FCO, DECC/BEIS, DEFRA, DfE, HMT, BIS, ONS and DLUHC all appear. +5. **Contradiction types.** 4 `claims-unchanged`, 6 `claims-on-track`, 3 `names-different-date`. + +### Doubts (Set B3) + +- **Clean contradictions:** + - B06 Magnox ("will not impact on the project end date"); + - B09 PSBP-PF ("No deviation from planned schedule"); + - B01 Electoral Registration ("overall timescale ... remain on track"); + - B02, B03, B08, B13 (single-sentence "on schedule" claims). +- **Weaker contradictions:** + - B04 is about benefits and B05 says "in line with the approved plan"; + - B07 gives phase dates and B12 milestones; + - B09 (2043) and B10 (2026) have published dates that may reflect later contract periods; + - B11 names 2022 against a published 2017. +- **Weak explained cases:** B15 contains "remains unchanged" about something else. B16 and B21 state a re-baseline or reset but no date. +- **No-move B29:** the equipment slip could be read as an end-date claim. +- **Published-date-check B30–B35:** each names a later closure or end date than the column. + - B31's first date (June 2013) is close to the column; its formal closure (Oct 2014) is the one that differs. + - In four of the six (B30–B33), the published date was already past at the release date. + + +--- + +# Held-out set 4: sources and provenance + +## Completion status + +PolicyLens: 15 cases completed (5 real, 10 modelled); 6 pass, 3 review, 6 stop. Five real cases have an expected pass. No tool or benchmark was run, and no implementation, test or engine files were read. + +ProjectLens: complete. `projectlens-heldout4.json` contains 30 real year-on-year pairs across 30 distinct projects: 8 contradiction, 9 explained, 11 no-move and 2 published-date-check. On 30 October 2026 the user explicitly authorised older release years while retaining project-level exclusions. All 60 published date cells and all 30 verbatim current schedule cells were independently checked. No product or benchmark was run. + +## PolicyLens method and label rules + +Real cases contain the unchanged PolicyVersion.Document from pinned MAMIP snapshots. IAMTrail is the renamed zoph-io/MAMIP repository. Every selected pair has different AWS VersionId values. A version change with an identical Document is a genuine no-permission-change control; an archive-only formatting change is not selected. AWSCodeCommitReadOnly v12–v13 and AmazonEC2ReadOnlyAccess v3–v4 are such controls. + +Modelled cases are explicitly reconstructed counterfactuals. They are not historical policies, deployed resources or incidents. AWS examples retain their example identifiers. Each case identifies exactly which example fields were changed. Rhino documents describe attack permission combinations rather than complete historical policies; those four JSON pairs use explicitly declared modelling choices and prerequisites. The account 123456789012 and role name role_i_can_assume are placeholders, not claims about an actual account. + +Expected statuses are independent human labels, assigned without running either tool. Pass means no material increase in the reviewed security risk (including ordinary read-only service functionality). Review means a bounded permission or control change needing contextual owner approval. Stop means a newly public grant, removed data boundary, or a documented escalation path. These are change-risk judgements, not full AWS effective-permission evaluations. External SCPs, boundaries, trust and service configuration can constrain the resulting access. + +Context-dependent labels: PLH4-A08 (removing an HTTPS subscription constraint for one existing account), PLH4-A09 (reading logs in one named group), and PLH4-A10 (retention management in one named group) are review rather than stop. Local confidentiality or retention requirements could justify stop. PLH4-A05 is pass because AWS classifies streaming speech synthesis as Read; ordinary service consumption can still incur charges. Rhino stop cases identify potential escalation, with prerequisites stated in each case, rather than asserting exploitability in an unknown account. + +## Exclusions and verification + +Only permitted held-out JSON and original input case data were used for exclusion. No commands from either product were run. Case pairs were compared against all 45 prior PolicyLens held-out cases and the original before/after/candidate policy documents. There are no exact duplicate pairs. The selected MAMIP policy names and Rhino methods 9, 12, 19 and 21 are absent from the prior selected cases and original input scenarios. AWS modelled changes use different operations/control changes from the earlier cases. + +Project exclusions were compared by GMPP identity and normalised project name across all three held-out sets and the original gmpp_pairs.json. Raw evidence, scripts, candidate records and validation results remain under evidence/. Research files do not constitute additional final fixtures. All writes are confined to this folder. + +## Licences + +- UK Government data and narratives: contains public sector information licensed under the Open Government Licence v3.0. Attribution: the publishing departments, Major Projects Authority / Infrastructure and Projects Authority / National Infrastructure and Service Transformation Authority. Licence: https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/ . +- MAMIP / IAMTrail repository: GNU General Public License version 3. The full upstream licence is preserved in evidence/source-mamiplicense.html (plain licence text despite the extension). The pinned snapshots retain upstream provenance. No separate broader licence is asserted for the underlying AWS-authored policy documents. +- AWS documentation: © Amazon Web Services, Inc. or its affiliates. The website links to AWS Site Terms. No blanket open licence for the downloaded HTML was established. These fixtures use documented policy examples and expressly labelled transformations; do not describe the entire source corpus as openly licensed. AWS Site Terms: https://aws.amazon.com/terms/ . +- Rhino Security Labs: copyrighted source article; no explicit open reuse licence established. The fixtures paraphrase the permission combinations and do not reproduce the article prose. Terms: https://rhinosecuritylabs.com/terms-and-conditions/ . +- This source inventory grants no additional rights. Local exclusion material is used only for duplicate prevention, not as new source data. + +## URL inventory + +The following inventory includes final-case sources and downloaded research sources, including candidates that were not selected. GitHub blob links identify human-readable provenance; raw links identify downloaded JSON. Failed/noncanonical AWS service-reference URLs are retained as research history; final classifications use list_dynamodb.html and list_polly.html. + +### Rhino Security Labs + +- https://rhinosecuritylabs.com/aws/aws-privilege-escalation-methods-mitigation/ +- https://rhinosecuritylabs.com/terms-and-conditions/ + +### MAMIP / IAMTrail + +- https://api.github.com/repos/zoph-io/IAMTrail/commits?path=policies/AWSCodeCommitReadOnly&per_page=6 +- https://api.github.com/repos/zoph-io/IAMTrail/commits?path=policies/AWSCompromisedKeyQuarantine&per_page=6 +- https://api.github.com/repos/zoph-io/IAMTrail/commits?path=policies/AWSCompromisedKeyQuarantineV3&per_page=6 +- https://api.github.com/repos/zoph-io/IAMTrail/commits?path=policies/AWSLambda_ReadOnlyAccess&per_page=6 +- https://api.github.com/repos/zoph-io/IAMTrail/commits?path=policies/AmazonDynamoDBReadOnlyAccess&per_page=6 +- https://api.github.com/repos/zoph-io/IAMTrail/commits?path=policies/AmazonEC2ReadOnlyAccess&per_page=10 +- https://api.github.com/repos/zoph-io/IAMTrail/commits?path=policies/AmazonEC2ReadOnlyAccess&per_page=6 +- https://api.github.com/repos/zoph-io/IAMTrail/commits?path=policies/AmazonPollyReadOnlyAccess&per_page=6 +- https://api.github.com/repos/zoph-io/IAMTrail/commits?path=policies/AmazonS3ReadOnlyAccess&per_page=6 +- https://api.github.com/repos/zoph-io/IAMTrail/commits?path=policies/ReadOnlyAccess&per_page=5 +- https://github.com/zoph-io/IAMTrail/blob/112c77ac4335dc09943d4aab47bdcd612861a09e/policies/AWSCompromisedKeyQuarantineV3 +- https://github.com/zoph-io/IAMTrail/blob/1a1f31327d0e8ae08a72c335ad8f332093640862/policies/AmazonPollyReadOnlyAccess +- https://github.com/zoph-io/IAMTrail/blob/421c58eb060fec5117481e9a125a2ec859a24f8e/policies/AmazonEC2ReadOnlyAccess +- https://github.com/zoph-io/IAMTrail/blob/51c001c08a091628ef24d503539c806ae0529ced/policies/AWSCodeCommitReadOnly +- https://github.com/zoph-io/IAMTrail/blob/574fe81f0b4eeaf3b7e40adaa1789044375a2783/policies/AWSCodeCommitReadOnly +- https://github.com/zoph-io/IAMTrail/blob/792b24e0b678ad40dd6083557cd72d0d7cdcce27/policies/AmazonDynamoDBReadOnlyAccess +- https://github.com/zoph-io/IAMTrail/blob/9d479f79b4fd32488764788bb84221e1f8791ff6/policies/AWSCompromisedKeyQuarantineV3 +- https://github.com/zoph-io/IAMTrail/blob/aafbae9e6087b732577df3a0556f8677e5d4c79b/policies/AmazonDynamoDBReadOnlyAccess +- https://github.com/zoph-io/IAMTrail/blob/c6b62c2e77b27e0efa35ac0f5dec14ade89360cd/policies/AmazonEC2ReadOnlyAccess +- https://github.com/zoph-io/IAMTrail/blob/f86339e42d7d7331bee51d24aff6f8690be5258f/policies/AmazonPollyReadOnlyAccess +- https://github.com/zoph-io/MAMIP +- https://raw.githubusercontent.com/zoph-io/IAMTrail/01407009f178b79563b98779c290037496d7b6c0/policies/AWSCompromisedKeyQuarantineV3 +- https://raw.githubusercontent.com/zoph-io/IAMTrail/112c77ac4335dc09943d4aab47bdcd612861a09e/policies/AWSCompromisedKeyQuarantineV3 +- https://raw.githubusercontent.com/zoph-io/IAMTrail/115f98b799ed9a88dc6e9e05a9604133a2efbabe/policies/AWSCompromisedKeyQuarantine +- https://raw.githubusercontent.com/zoph-io/IAMTrail/152e183c64331fedec31b4a41456541126ca0fa9/policies/AWSCodeCommitReadOnly +- https://raw.githubusercontent.com/zoph-io/IAMTrail/1a1f31327d0e8ae08a72c335ad8f332093640862/policies/AmazonPollyReadOnlyAccess +- https://raw.githubusercontent.com/zoph-io/IAMTrail/1b36617981d5e8905ceb82b8dcbd892340a023ba/policies/AWSCompromisedKeyQuarantine +- https://raw.githubusercontent.com/zoph-io/IAMTrail/1b36617981d5e8905ceb82b8dcbd892340a023ba/policies/AmazonDynamoDBReadOnlyAccess +- https://raw.githubusercontent.com/zoph-io/IAMTrail/1b36617981d5e8905ceb82b8dcbd892340a023ba/policies/AmazonPollyReadOnlyAccess +- https://raw.githubusercontent.com/zoph-io/IAMTrail/1b36617981d5e8905ceb82b8dcbd892340a023ba/policies/AmazonS3ReadOnlyAccess +- https://raw.githubusercontent.com/zoph-io/IAMTrail/2aba338d8f83d36cb6613929dac76de09d575ced/policies/AWSLambda_ReadOnlyAccess +- https://raw.githubusercontent.com/zoph-io/IAMTrail/421c58eb060fec5117481e9a125a2ec859a24f8e/policies/AmazonEC2ReadOnlyAccess +- https://raw.githubusercontent.com/zoph-io/IAMTrail/496930bc8ce9ad6d76be814e9e45883fefbdc6ba/policies/AWSCompromisedKeyQuarantine +- https://raw.githubusercontent.com/zoph-io/IAMTrail/51c001c08a091628ef24d503539c806ae0529ced/policies/AWSCodeCommitReadOnly +- https://raw.githubusercontent.com/zoph-io/IAMTrail/574fe81f0b4eeaf3b7e40adaa1789044375a2783/policies/AWSCodeCommitReadOnly +- https://raw.githubusercontent.com/zoph-io/IAMTrail/69642b9f2c33c34a6fbc88e518588451a5c06c24/policies/AmazonS3ReadOnlyAccess +- https://raw.githubusercontent.com/zoph-io/IAMTrail/792b24e0b678ad40dd6083557cd72d0d7cdcce27/policies/AmazonDynamoDBReadOnlyAccess +- https://raw.githubusercontent.com/zoph-io/IAMTrail/9621e9a579c0d6bd77a8266b4bc92a623d5b99a2/policies/AWSCompromisedKeyQuarantineV3 +- https://raw.githubusercontent.com/zoph-io/IAMTrail/984d0f98da74b5b839df2191e70f629fb8963bf3/policies/AWSLambda_ReadOnlyAccess +- https://raw.githubusercontent.com/zoph-io/IAMTrail/9d479f79b4fd32488764788bb84221e1f8791ff6/policies/AWSCompromisedKeyQuarantineV3 +- https://raw.githubusercontent.com/zoph-io/IAMTrail/9f5aa4e02369222a9af4b9320d80db12ac649a60/policies/AWSLambda_ReadOnlyAccess +- https://raw.githubusercontent.com/zoph-io/IAMTrail/a965aa7b3fd39e371dc6f29355654f9511d91bdf/policies/AmazonDynamoDBReadOnlyAccess +- https://raw.githubusercontent.com/zoph-io/IAMTrail/aafbae9e6087b732577df3a0556f8677e5d4c79b/policies/AWSCompromisedKeyQuarantine +- https://raw.githubusercontent.com/zoph-io/IAMTrail/aafbae9e6087b732577df3a0556f8677e5d4c79b/policies/AmazonDynamoDBReadOnlyAccess +- https://raw.githubusercontent.com/zoph-io/IAMTrail/aafbae9e6087b732577df3a0556f8677e5d4c79b/policies/AmazonPollyReadOnlyAccess +- https://raw.githubusercontent.com/zoph-io/IAMTrail/aafbae9e6087b732577df3a0556f8677e5d4c79b/policies/AmazonS3ReadOnlyAccess +- https://raw.githubusercontent.com/zoph-io/IAMTrail/aba4b375edbeca4782035568c78ba1d23a17a886/policies/AmazonEC2ReadOnlyAccess +- https://raw.githubusercontent.com/zoph-io/IAMTrail/b7ce2f2f36b921494ee79f19f3d6285c8767a7c0/policies/AWSLambda_ReadOnlyAccess +- https://raw.githubusercontent.com/zoph-io/IAMTrail/b8eeeb47c959fa988e517ee33ea4d505f7bb207c/policies/AmazonEC2ReadOnlyAccess +- https://raw.githubusercontent.com/zoph-io/IAMTrail/c6b62c2e77b27e0efa35ac0f5dec14ade89360cd/policies/AmazonEC2ReadOnlyAccess +- https://raw.githubusercontent.com/zoph-io/IAMTrail/cada7478f3261103db996436a683127f125584e4/policies/AWSCodeCommitReadOnly +- https://raw.githubusercontent.com/zoph-io/IAMTrail/cf1e4413c77fc0810114b72e35162510bce97756/policies/AmazonS3ReadOnlyAccess +- https://raw.githubusercontent.com/zoph-io/IAMTrail/f86339e42d7d7331bee51d24aff6f8690be5258f/policies/AmazonPollyReadOnlyAccess +- https://raw.githubusercontent.com/zoph-io/IAMTrail/main/LICENSE + +### GMPP and UK Government + +- https://assets.publishing.service.gov.uk/media/5a74b963ed915d502d6ca79b/gmpp-data-DWP-q2-2012-13.csv +- https://assets.publishing.service.gov.uk/media/5a74f283ed915d502d6cc473/gmpp-data-HMT-q2-2012-13_ELPS.csv +- https://assets.publishing.service.gov.uk/media/5a74f33c40f0b6399b2af792/HO_Major_projects.csv +- https://assets.publishing.service.gov.uk/media/5a7b88a5ed915d4147620fed/gmpp-data-MoJ-q2-2012-13.csv +- https://assets.publishing.service.gov.uk/media/5a7b93c1e5274a7318b8f913/gmpp-data-DfID-q2-2012-13a.csv +- https://assets.publishing.service.gov.uk/media/5a7bffe7ed915d01ba1ca7f4/gmpp-data-DCMS-q2-2012-13.csv +- https://assets.publishing.service.gov.uk/media/5a7c1f1fe5274a1f5cc75ebc/gmpp-data-cabinet-office-q2-2012-13.csv +- https://assets.publishing.service.gov.uk/media/5a7c324a40f0b67d0b11f801/BIS-_gmpp-data-q2-2012-13.csv +- https://assets.publishing.service.gov.uk/media/5a7c35bbed915d76e2ebbd13/20130524_mod_gmpp_data.csv +- https://assets.publishing.service.gov.uk/media/5a7c47ede5274a1b00422b52/gmpp-data-DfE-q2-2012-13.csv +- https://assets.publishing.service.gov.uk/media/5a7c83a7e5274a2674eab2c6/gmpp-data-DCLG-q2-2012-13.csv +- https://assets.publishing.service.gov.uk/media/5a7c8ce3ed915d48c2410849/gmpp-data-FCO-q2-2012-13.csv +- https://assets.publishing.service.gov.uk/media/5a7c96c1ed915d6969f45f1d/gmpp-data-HMRC-q2-2012-13.csv +- https://assets.publishing.service.gov.uk/media/5a7cab85ed915d6969f46841/gmpp-data-DH-q2-2012-13.csv +- https://assets.publishing.service.gov.uk/media/5a7ce3d7ed915d36e95f0481/gmpp-data-DECC-q2-2012-13.csv +- https://assets.publishing.service.gov.uk/media/5a7ea47a40f0b62305b823ee/Government_Major_Projects_Portfolio_data__September_2013__CSV_.csv +- https://assets.publishing.service.gov.uk/media/5a7f0962ed915d74e33f3fb5/gmpp-data-dft-q2-2012-13.csv +- https://assets.publishing.service.gov.uk/media/6895fbb63080e72710b2e2ef/nista_annual_report_data_2425.csv +- https://assets.publishing.service.gov.uk/media/6a4fb28da6586e258d371bfd/NISTA_Major_Projects_Annual_Report_2025-2026_Data.csv +- https://www.gov.uk/government/collections/major-projects-data +- https://www.gov.uk/government/publications/government-major-projects-portfolio-data-for-bis-2013 +- https://www.gov.uk/government/publications/government-major-projects-portfolio-data-for-cabinet-office-2013 +- https://www.gov.uk/government/publications/government-major-projects-portfolio-data-for-dclg-2013 +- https://www.gov.uk/government/publications/government-major-projects-portfolio-data-for-dcms-2013 +- https://www.gov.uk/government/publications/government-major-projects-portfolio-data-for-decc-2013 +- https://www.gov.uk/government/publications/government-major-projects-portfolio-data-for-department-of-health-2013--2 +- https://www.gov.uk/government/publications/government-major-projects-portfolio-data-for-dfid-2013 +- https://www.gov.uk/government/publications/government-major-projects-portfolio-data-for-dft-2013 +- https://www.gov.uk/government/publications/government-major-projects-portfolio-data-for-dwp-2013 +- https://www.gov.uk/government/publications/government-major-projects-portfolio-data-for-hm-treasury-2013 +- https://www.gov.uk/government/publications/government-major-projects-portfolio-data-for-hmrc-2013 +- https://www.gov.uk/government/publications/government-major-projects-portfolio-data-for-mod-2013 +- https://www.gov.uk/government/publications/government-major-projects-portfolio-data-for-moj-2013--2 +- https://www.gov.uk/government/publications/government-major-projects-portfolio-data-for-the-department-for-education-2013--2 +- https://www.gov.uk/government/publications/government-major-projects-portfolio-data-for-the-foreign-and-commonwealth-office-2013 +- https://www.gov.uk/government/publications/home-office-major-projects-portfolio-data-2013 +- https://www.gov.uk/government/publications/major-projects-authority-annual-report-2013 +- https://www.gov.uk/government/publications/major-projects-authority-annual-report-2014 +- https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26 +- https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/ + +### AWS documentation + +- https://aws.amazon.com/documentation-overview/ +- https://aws.amazon.com/terms/ +- https://docs.aws.amazon.com/AmazonCloudWatch/latest/logs/iam-identity-based-access-control-cwl.html +- https://docs.aws.amazon.com/AmazonS3/latest/userguide/tagging-and-policies.html +- https://docs.aws.amazon.com/IAM/latest/UserGuide/reference_policies_condition-keys.html +- https://docs.aws.amazon.com/IAM/latest/UserGuide/reference_policies_examples_iam_mfa-selfmanage.html +- https://docs.aws.amazon.com/service-authorization/latest/reference/list_amazondynamodb.html +- https://docs.aws.amazon.com/service-authorization/latest/reference/list_amazonpolly.html +- https://docs.aws.amazon.com/service-authorization/latest/reference/list_dynamodb.html +- https://docs.aws.amazon.com/service-authorization/latest/reference/list_polly.html +- https://docs.aws.amazon.com/sns/latest/dg/sns-access-policy-use-cases.html + +## ProjectLens set 4: final selection and checks + +The current fixture contains only real official GMPP schedule cells. The narrative is the complete current-release schedule narrative, not a summary or a concatenation of other commentary. Original spelling, punctuation, whitespace and embedded line endings are retained. The `why` field is the independent label rationale. + +Pairs use consecutive annual-report release years. Year N means the release published in N, labelled (N-1)-N; it does not mean the snapshot was taken in calendar year N. The 2013 departmental baselines report Q2 2012–13. Subsequent selected releases report data as at 30 September of the preceding calendar year. Dates are converted to ISO 8601, and movement is the exact signed calendar-day difference. BIS's 2013 baseline uses US month/day/year; the other selected sources use day/month/year. No date was silently corrected, rounded or replaced by a narrative date. + +Selected releases do not publish GMPP IDs. No IDs were invented or inferred from the project name. Project identities were checked against all `*heldout*.json` files in both tool repositories, the identity fields in every original ProjectLens input JSON, and project names in original XER PROJECT tables. A further name-to-ID crosswalk across the public 2020–2026 raw releases checks renamed projects against seen IDs and their observed names. The Fraud, Error and Debt Programme also appears as DWP_0016_1213-Q2 in later releases; that identity is absent from the exclusion pool. Conservative aliases exclude Crossrail, HS2, Thameslink, IEP, the Priority School Building Programme, Broadband Delivery/Project Gigabit, and other renamed programme families. Similar words alone do not make distinct programmes identical. + +The selected previous and current project names match uniquely after case and punctuation normalisation. All 30 selected projects are distinct. This checks project identities, rather than merely excluding previously used year-pairs. Neither implementation, tests, engines nor executable tools were read or run. Source CSV processing and fixture validation use independent scripts under `evidence/`. + +Checks: 30 unique case IDs; 30 distinct projects; 60 source date checks; 30 exact current narrative comparisons; 30 signed date-difference checks; no excluded normalised names or GMPP ID matches. Evidence: `evidence/projectlens-validation.json`, `evidence/project-exclusion-index.json`, `evidence/project-identity-audit.json` and `evidence/projectlens-selection.json`. This is a provenance check, not a product score. + +### Label interpretation and doubtful labels + +Explained means the narrative explicitly acknowledges a revision, extension, delay or acceleration; an exact numerical reconciliation is not required. An acknowledged move takes precedence over an on-track claim. No-move and published-date-check require exactly equal published date cells. Month-only narrative dates are treated at their stated precision. Both selected published-date-check cases exceed 14 days even at the nearest boundary. + +These findings describe the published commentary and the published end-date fields. They do not establish wrongdoing, project delivery failure, or that the same milestones underlie every field. + +Four contradiction labels are sensitive to scope or precision, and are deliberately disclosed: + +- **PLH4-B01, Enterprise Zones Programme:** 2015 changes to 2038, while the complete narrative says “On schedule”. A changed reporting horizon could explain the difference; the source does not establish that explanation. +- **PLH4-B02, Submarine Enterprise Performance Programme:** 1 March changes to 31 March, while the programme is described as on track. The source may be using different month-boundary precision. +- **PLH4-B03, Broadmoor Redevelopment Programme:** the commentary says all activities are on or ahead of programme but discusses construction activities. The overall end-date field may include later commissioning or closure. +- **PLH4-B06, New Employment Model:** the programme remains “on track” by 2021 despite a 28-day change within October 2021. The statement remains compatible at year precision. The supplied on-track labelling rule determines the label. + +Additional source caveats do not change the labels: **B10** acknowledges a later BIS Shared Services date but gives a correction differing from the column; **B11** explains Benefit Cap's extension but gives actual closure later than the column; **B16** explicitly acknowledges an Integrated Delivery Programme end-date revision while describing later operational milestones; **B30** explicitly distinguishes Procurement Transformation go-live from programme closure, which can explain the published-date-check. These caveats are also retained in fixture metadata. + +### Final ProjectLens source URLs + +All following official UK Government CSVs and their schedule narratives contain public sector information licensed under the [Open Government Licence v3.0](https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/). Attribution: the publishing departments and the Major Projects Authority / Infrastructure and Projects Authority. Local snapshots are preserved in `evidence/`; `evidence/sha256.json` records their hashes. + +- **2013 release:** [publication](https://www.gov.uk/government/publications/government-major-projects-portfolio-data-for-bis-2013); [original CSV](https://assets.publishing.service.gov.uk/media/5a7c324a40f0b67d0b11f801/BIS-_gmpp-data-q2-2012-13.csv). +- **2013 release:** [publication](https://www.gov.uk/government/publications/government-major-projects-portfolio-data-for-dclg-2013); [original CSV](https://assets.publishing.service.gov.uk/media/5a7c83a7e5274a2674eab2c6/gmpp-data-DCLG-q2-2012-13.csv). +- **2013 release:** [publication](https://www.gov.uk/government/publications/government-major-projects-portfolio-data-for-department-of-health-2013--2); [original CSV](https://assets.publishing.service.gov.uk/media/5a7cab85ed915d6969f46841/gmpp-data-DH-q2-2012-13.csv). +- **2013 release:** [publication](https://www.gov.uk/government/publications/government-major-projects-portfolio-data-for-dwp-2013); [original CSV](https://assets.publishing.service.gov.uk/media/5a74b963ed915d502d6ca79b/gmpp-data-DWP-q2-2012-13.csv). +- **2013 release:** [publication](https://www.gov.uk/government/publications/government-major-projects-portfolio-data-for-mod-2013); [original CSV](https://assets.publishing.service.gov.uk/media/5a7c35bbed915d76e2ebbd13/20130524_mod_gmpp_data.csv). +- **2013 release:** [publication](https://www.gov.uk/government/publications/government-major-projects-portfolio-data-for-moj-2013--2); [original CSV](https://assets.publishing.service.gov.uk/media/5a7b88a5ed915d4147620fed/gmpp-data-MoJ-q2-2012-13.csv). +- **2013 release:** [publication](https://www.gov.uk/government/publications/government-major-projects-portfolio-data-for-the-foreign-and-commonwealth-office-2013); [original CSV](https://assets.publishing.service.gov.uk/media/5a7c8ce3ed915d48c2410849/gmpp-data-FCO-q2-2012-13.csv). +- **2014 release:** [publication](https://www.gov.uk/government/publications/major-projects-authority-annual-report-2014); [original CSV](https://assets.publishing.service.gov.uk/media/5a7ea47a40f0b62305b823ee/Government_Major_Projects_Portfolio_data__September_2013__CSV_.csv). +- **2015 release:** [publication](https://www.gov.uk/government/publications/major-projects-authority-annual-report-2015); [original CSV](https://assets.publishing.service.gov.uk/media/5a801db6ed915d74e33f88a0/GMPP_data_september_2014.csv). +- **2016 release:** [publication](https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2016); [original CSV](https://assets.publishing.service.gov.uk/media/5a80a49ce5274a2e8ab51547/government_major_projects_portfolio_data_september_2015.csv). +- **2017 release:** [publication](https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2017); [original CSV](https://assets.publishing.service.gov.uk/media/5a821ed6e5274a2e8ab57995/Annual_Report_-_consolidated_data_and_narratives.csv). +- **2018 release:** [publication](https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2018); [original CSV](https://assets.publishing.service.gov.uk/media/5b3e2e2340f0b678bc5d018c/csv-ipa-government-major-projects-portfolio-data-september-2017.csv). +- **2019 release:** [publication](https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2019); [original CSV](https://assets.publishing.service.gov.uk/media/5d2dd08d40f0b64a8626b762/Annual_Report_on_Major_Projects_2018_to_2019__consolidated_data_and_narratives.csv). + +### Final ProjectLens case inventory + +| Case | Project | Releases | Label | +|---|---|---|---| +| PLH4-B01 | Enterprise Zones Programme | 2013–2014 | contradiction | +| PLH4-B02 | Submarine Enterprise Performance Programme | 2013–2014 | contradiction | +| PLH4-B03 | Broadmoor Redevelopment Programme | 2014–2015 | contradiction | +| PLH4-B04 | Health Visitor Programme | 2014–2015 | contradiction | +| PLH4-B05 | Harmondsworth and Colnbrook Retender | 2014–2015 | contradiction | +| PLH4-B06 | New Employment Model | 2014–2015 | contradiction | +| PLH4-B07 | 2011 Census | 2014–2015 | contradiction | +| PLH4-B08 | CAP Delivery Programme | 2016–2017 | contradiction | +| PLH4-B09 | FE Capital Investment Programme | 2013–2014 | explained | +| PLH4-B10 | BIS Shared Services | 2013–2014 | explained | +| PLH4-B11 | Benefit Cap | 2013–2014 | explained | +| PLH4-B12 | Puma Helicopter Life Extension Programme | 2013–2014 | explained | +| PLH4-B13 | Type 45 Destroyers | 2013–2014 | explained | +| PLH4-B14 | Fraud, Error and Debt Programme | 2014–2015 | explained | +| PLH4-B15 | Next Generation Estates Contracts | 2014–2015 | explained | +| PLH4-B16 | Integrated Delivery Programme | 2014–2015 | explained | +| PLH4-B17 | 100000 Genomes Project | 2017–2018 | explained | +| PLH4-B18 | Health and Care Modernisation Transition Programme | 2013–2014 | no-move | +| PLH4-B19 | Summary Care Record (SCR) | 2013–2014 | no-move | +| PLH4-B20 | Southern Programme for IT | 2013–2014 | no-move | +| PLH4-B21 | N3 Extension | 2013–2014 | no-move | +| PLH4-B22 | CAB Variation | 2013–2014 | no-move | +| PLH4-B23 | UKERP | 2013–2014 | no-move | +| PLH4-B24 | Logistics Commodities Services Transformation | 2013–2014 | no-move | +| PLH4-B25 | Court Estates Reform | 2013–2014 | no-move | +| PLH4-B26 | National Offender Management Information Systems (NOMIS) Programme | 2013–2014 | no-move | +| PLH4-B27 | Further Education 24+ Learning Loans Programme | 2014–2015 | no-move | +| PLH4-B28 | National Cyber Security Programme | 2014–2015 | no-move | +| PLH4-B29 | Central Payment System | 2013–2014 | published-date-check | +| PLH4-B30 | Procurement Transformation Programme | 2018–2019 | published-date-check | + + +## Set 5 (built 30 Oct 2026, unseen when first scored) + +# Held-out set 5: sources, licences and construction + +Built independently from public sources. The two target tools were not run. No implementation, test or engine file in either tool repository was read. Permitted prior benchmark JSON and original input data were used only for format and exclusion checks. + +## Files and counts + +- `policylens-heldout5.json`: 30 cases; 10 real MAMIP version changes and 20 explicitly modelled changes. Expected labels: 10 pass, 9 review and 11 stop. Eight real changes are pass. The modelled cases cover all 15 requested services, with 9 identity, 10 resource and 1 trust-policy comparison. +- `projectlens-heldout5.json`: the existing `{ "meta": ..., "cases": [...] }` format; 40 annual pairs from 40 distinct projects. Labels: 10 contradiction, 18 explained, 8 no-move and 4 published-date-check. +- `.work/` retains downloaded public evidence, source manifests, construction scripts, the exclusion register and a validation result. These are supporting evidence, not additional benchmark inputs. + +## Licences and attribution + +### UK Government + +Contains public sector information licensed under the Open Government Licence v3.0. Attribution: the UK Government departments named in each record, the Major Projects Authority, the Infrastructure and Projects Authority, and the National Infrastructure and Service Transformation Authority, as applicable. Dates and schedule narratives are copied from their published GMPP data; calculations and labels are independently authored. + +- Licence: https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/ +- Official release collection: https://www.gov.uk/government/collections/major-projects-data + +### MAMIP / IAMTrail archive + +The requested MAMIP repository now redirects to IAMTrail. The archive repository supplies GNU GPL version 3 in its LICENSE file. The policy documents are AWS-authored managed policies; citing the archive licence does not assert that its maintainer owns or relicenses AWS copyright. Every real fixture preserves the archived PolicyVersion.Document object unchanged, with immutable commits and original version creation dates below. A local copy of the archive licence is retained at `.work/MAMIP-LICENSE.txt`. + +- Requested repository: https://github.com/zoph-io/MAMIP +- Current repository: https://github.com/zoph-io/IAMTrail +- Archive licence: https://github.com/zoph-io/IAMTrail/blob/main/LICENSE +- Licence text: https://raw.githubusercontent.com/zoph-io/IAMTrail/main/LICENSE + +### AWS documentation and policy examples + +Attribution: Amazon Web Services, Inc. and/or its affiliates. AWS Site Terms, under License and Site Access, explicitly license docs.aws.amazon.com documentation as CC-BY-SA-4.0 and code within it as MIT-0. The JSON policy examples are used as code examples. Each modelling transformation is identified below; no modelled before/after pair is presented as a captured deployment or historical incident. + +- AWS Site Terms, including the documentation/code licence statement: https://aws.amazon.com/terms/ +- Documentation licence: https://creativecommons.org/licenses/by-sa/4.0/ +- MIT-0 sample-code licence text, AWS IAM documentation repository: https://raw.githubusercontent.com/awsdocs/iam-user-guide/main/LICENSE +- MIT-0 sample-code licence text, AWS EC2 documentation repository: https://raw.githubusercontent.com/awsdocs/amazon-ec2-user-guide/master/LICENSE-SAMPLECODE +- AWS Intellectual Property License, with the separate-licence precedence clause: https://aws.amazon.com/legal/aws-ip-license-terms/ + +### Rhino Security Labs + +Attribution: Spencer Gietzen, Rhino Security Labs, AWS IAM Privilege Escalation – Methods and Mitigation. The cited article does not identify an open reuse licence. Copyright remains with its rights holders; no article prose is reproduced here. Cases A20 and A30 use independently paraphrased security facts from methods 7 and 16. A30 reconstructs an expressly modelled action combination rather than claiming Rhino published that JSON policy. + +- Article: https://rhinosecuritylabs.com/aws/aws-privilege-escalation-methods-mitigation/ + +## Exclusion and labelling method + +The exclusion register covers all four committed held-out sets in both permitted bench directories, the original policy before/after inputs, the original GMPP pair inputs, and XER project identifiers. In particular, GMPP input records use `name` and `prevName`, not only `project`. All these fields were included. The final register has 399 literal project names (340 after case, punctuation and spacing normalisation) and 203 IDs, plus prior policy case identifiers and document fingerprints. None of the selected project names, preceding names or IDs matches that register. Known name/ID links are propagated across the downloaded releases. Selected historical renames are documented in each case. Shared services, platforms or a common department are not by themselves proof that two distinct programmes are the same project. + +ProjectLens uses the complete current-release schedule cell, retaining original spelling, punctuation, line endings and whitespace. No sentence is removed to hide a date-move explanation. `prevYear` and `year` are annual-report release years; `source.previous.release` and `source.current.release` give financial-year release labels. Older releases generally contain the preceding September snapshot. End dates are normalised only where a complete published date is available; original cells remain in `prevEndAsPublished` and `curEndAsPublished`. `daysMoved` is the signed difference in calendar days. Sources identify CSV record or project-column positions, not physical text-file line numbers, because quoted CSV cells can contain line breaks. + +ProjectLens labels follow C2: a stated end-date movement is explained; an unstated move with an unchanged/on-track claim, or an unexplained conflicting current finish more than 14 days away, is a contradiction. Unchanged end fields are no-move unless the commentary names a different current finish/closure, when they are published-date-check. Milestones and operational go-live are not automatically equated with formal project closure. The remaining scope-sensitive judgments are listed below. + +PolicyLens labels are judgments about the change, not a claim that the entire existing policy is least privilege. Metadata listings/descriptions, public price-catalogue access and access narrowing pass. New scoped data, invocation or write capabilities require review. New external grants, removed security requirements and documented escalation routes stop. A resource-policy Resource of * is interpreted within its attached resource; it is not automatically treated as every resource in the account. External IAM grants, key policies, boundaries, SCPs and runtime prerequisites are not invented or assumed satisfied. + +## Real MAMIP managed-policy changes + +### PLH5-A01: AWSConfigRole v25 -> v26 + +Expected: **pass**. The only new permission reads S3 Object Lock configuration. It adds metadata inspection, not object access, mutation or delegation. + +- Before: v25; AWS creation date `2019-05-13T21:29:39Z`; commit `5ec6e0b5fef3045acfc5b4b7d8be5c4eab9c3686`. + - Snapshot: https://github.com/zoph-io/IAMTrail/blob/5ec6e0b5fef3045acfc5b4b7d8be5c4eab9c3686/policies/AWSConfigRole + - Raw: https://raw.githubusercontent.com/zoph-io/IAMTrail/5ec6e0b5fef3045acfc5b4b7d8be5c4eab9c3686/policies/AWSConfigRole + - Download SHA-256: `1d7b2f5c10a2a3171221b7eb529da741d739748b908280a32d43fd40563be357`. +- After: v26; AWS creation date `2019-06-10T22:53:30Z`; commit `c714415804a7630f61a269253c07dc0b1d162ca1`. + - Snapshot: https://github.com/zoph-io/IAMTrail/blob/c714415804a7630f61a269253c07dc0b1d162ca1/policies/AWSConfigRole + - Raw: https://raw.githubusercontent.com/zoph-io/IAMTrail/c714415804a7630f61a269253c07dc0b1d162ca1/policies/AWSConfigRole + - Download SHA-256: `82cb5d40a0c4853ecb08307284bc7e589c6abfa834cd9f74fb248b9530057262`. + +None. Both PolicyVersion.Document objects are copied unchanged from the archive. + +### PLH5-A02: AWSGlueConsoleFullAccess v12 -> v13 + +Expected: **pass**. The only addition is cloudformation:ListStacks. Stack listing adds no data-plane, write or IAM authority. + +- Before: v12; AWS creation date `2019-02-11T19:49:01Z`; commit `6655c5d223a7852998cb6ec74e7e59b939feb221`. + - Snapshot: https://github.com/zoph-io/IAMTrail/blob/6655c5d223a7852998cb6ec74e7e59b939feb221/policies/AWSGlueConsoleFullAccess + - Raw: https://raw.githubusercontent.com/zoph-io/IAMTrail/6655c5d223a7852998cb6ec74e7e59b939feb221/policies/AWSGlueConsoleFullAccess + - Download SHA-256: `432c7034a949076bc054fbe71072c66e0cd7cbed98651462a62b2d99fb4ee1d3`. +- After: v13; AWS creation date `2023-03-30T15:58:41Z`; commit `08e36925dc6ef827eca182ec67061974c7aaa402`. + - Snapshot: https://github.com/zoph-io/IAMTrail/blob/08e36925dc6ef827eca182ec67061974c7aaa402/policies/AWSGlueConsoleFullAccess + - Raw: https://raw.githubusercontent.com/zoph-io/IAMTrail/08e36925dc6ef827eca182ec67061974c7aaa402/policies/AWSGlueConsoleFullAccess + - Download SHA-256: `7785143c9707b04a2b2bf14962e2d685af69de71d9a781ea9ee36713f1627265`. + +None. Both PolicyVersion.Document objects are copied unchanged from the archive. + +### PLH5-A03: AWSLambdaVPCAccessExecutionRole v2 -> v3 + +Expected: **pass**. Adds ec2:DescribeSubnets and a Sid. Existing network-interface writes are unchanged; the new action only describes subnet metadata. + +- Before: v2; AWS creation date `2020-10-15T22:53:03Z`; commit `276d18501c8e97e341775d0b1953a49d56bd8f28`. + - Snapshot: https://github.com/zoph-io/IAMTrail/blob/276d18501c8e97e341775d0b1953a49d56bd8f28/policies/AWSLambdaVPCAccessExecutionRole + - Raw: https://raw.githubusercontent.com/zoph-io/IAMTrail/276d18501c8e97e341775d0b1953a49d56bd8f28/policies/AWSLambdaVPCAccessExecutionRole + - Download SHA-256: `624d4dbd5c24f3e1b7abb933daac350498c5150a637850d1bc99c0c4a87fc985`. +- After: v3; AWS creation date `2024-01-05T22:38:26Z`; commit `56bc2e692e1f8d4b62c6d089f55b39230cc437f3`. + - Snapshot: https://github.com/zoph-io/IAMTrail/blob/56bc2e692e1f8d4b62c6d089f55b39230cc437f3/policies/AWSLambdaVPCAccessExecutionRole + - Raw: https://raw.githubusercontent.com/zoph-io/IAMTrail/56bc2e692e1f8d4b62c6d089f55b39230cc437f3/policies/AWSLambdaVPCAccessExecutionRole + - Download SHA-256: `b72be9ab6cfe438c1d461d8268968d985240aad862a2541265f1f12453ebb45e`. + +None. Both PolicyVersion.Document objects are copied unchanged from the archive. + +### PLH5-A04: AWSLambda_ReadOnlyAccess v2 -> v3 + +Expected: **review**. Adds logs:StartLiveTail and logs:StopLiveTail only for /aws/lambda/* log groups. These logs were already readable; review the new live-stream access within that scope. + +- Before: v2; AWS creation date `2023-07-27T17:32:05Z`; commit `9376f2efc867c81acc0e328c1052581a228dce0e`. + - Snapshot: https://github.com/zoph-io/IAMTrail/blob/9376f2efc867c81acc0e328c1052581a228dce0e/policies/AWSLambda_ReadOnlyAccess + - Raw: https://raw.githubusercontent.com/zoph-io/IAMTrail/9376f2efc867c81acc0e328c1052581a228dce0e/policies/AWSLambda_ReadOnlyAccess + - Download SHA-256: `2304fa1631d85185a4a40821f14fff5f34fd2d01d4dcddef3941a86d1f4acc71`. +- After: v3; AWS creation date `2025-03-17T21:07:06Z`; commit `2aba338d8f83d36cb6613929dac76de09d575ced`. + - Snapshot: https://github.com/zoph-io/IAMTrail/blob/2aba338d8f83d36cb6613929dac76de09d575ced/policies/AWSLambda_ReadOnlyAccess + - Raw: https://raw.githubusercontent.com/zoph-io/IAMTrail/2aba338d8f83d36cb6613929dac76de09d575ced/policies/AWSLambda_ReadOnlyAccess + - Download SHA-256: `a895eee11405c6217606f0e55c4319391591d48ec598d97c28e91e705a915a45`. + +None. Both PolicyVersion.Document objects are copied unchanged from the archive. + +### PLH5-A05: AmazonAthenaFullAccess v8 -> v9 + +Expected: **pass**. Adds pricing:GetProducts for the AWS price catalogue. This exposes public product/pricing metadata, not account data or write access. + +- Before: v8; AWS creation date `2022-11-14T21:05:56Z`; commit `a4c74c9a2d1161aef841e20b7506ac9c293a353a`. + - Snapshot: https://github.com/zoph-io/IAMTrail/blob/a4c74c9a2d1161aef841e20b7506ac9c293a353a/policies/AmazonAthenaFullAccess + - Raw: https://raw.githubusercontent.com/zoph-io/IAMTrail/a4c74c9a2d1161aef841e20b7506ac9c293a353a/policies/AmazonAthenaFullAccess + - Download SHA-256: `9f5f2a12502216806227817879de8b66d7278ade7c6ba6001b2c024baf47c2dc`. +- After: v9; AWS creation date `2023-01-24T16:59:23Z`; commit `3de991771fa90e8f2f9dcfab9ed6fda27372cd42`. + - Snapshot: https://github.com/zoph-io/IAMTrail/blob/3de991771fa90e8f2f9dcfab9ed6fda27372cd42/policies/AmazonAthenaFullAccess + - Raw: https://raw.githubusercontent.com/zoph-io/IAMTrail/3de991771fa90e8f2f9dcfab9ed6fda27372cd42/policies/AmazonAthenaFullAccess + - Download SHA-256: `15dd0abfedca797dcb3be881f741183a7982892c2dbcd3789129401da9d77b5c`. + +None. Both PolicyVersion.Document objects are copied unchanged from the archive. + +### PLH5-A06: AmazonEC2ContainerRegistryReadOnly v2 -> v3 + +Expected: **pass**. Adds lifecycle-policy, lifecycle-preview, tag and scan-finding reads. Existing image pulls are unchanged and no repository write or new principal is added. + +- Before: v2; AWS creation date `2016-10-11T22:08:43Z`; commit `ad4c2e8fdf77143515c3ca9f6efc0f4181ec6955`. + - Snapshot: https://github.com/zoph-io/IAMTrail/blob/ad4c2e8fdf77143515c3ca9f6efc0f4181ec6955/policies/AmazonEC2ContainerRegistryReadOnly + - Raw: https://raw.githubusercontent.com/zoph-io/IAMTrail/ad4c2e8fdf77143515c3ca9f6efc0f4181ec6955/policies/AmazonEC2ContainerRegistryReadOnly + - Download SHA-256: `6fa947a179295f447627d0a62768f73f82a84e376f96edc0d3a648e5ac380c7b`. +- After: v3; AWS creation date `2019-12-10T20:56:32Z`; commit `5d68ecfa21232031b8dea097737e4d3fb1808e4d`. + - Snapshot: https://github.com/zoph-io/IAMTrail/blob/5d68ecfa21232031b8dea097737e4d3fb1808e4d/policies/AmazonEC2ContainerRegistryReadOnly + - Raw: https://raw.githubusercontent.com/zoph-io/IAMTrail/5d68ecfa21232031b8dea097737e4d3fb1808e4d/policies/AmazonEC2ContainerRegistryReadOnly + - Download SHA-256: `1b86eef4a37d245b317474c630d36b2d6fbd4805c44bd5b23a79c0e5de93ee10`. + +None. Both PolicyVersion.Document objects are copied unchanged from the archive. + +### PLH5-A07: AmazonRDSFullAccess v10 -> v11 + +Expected: **pass**. Adds cloudwatch:ListMetrics only. Metric discovery does not add metric-value reads, database access or writes. + +- Before: v10; AWS creation date `2022-12-19T20:09:11Z`; commit `86ef2d3c5544197673d4a9977ad79fd539b311f1`. + - Snapshot: https://github.com/zoph-io/IAMTrail/blob/86ef2d3c5544197673d4a9977ad79fd539b311f1/policies/AmazonRDSFullAccess + - Raw: https://raw.githubusercontent.com/zoph-io/IAMTrail/86ef2d3c5544197673d4a9977ad79fd539b311f1/policies/AmazonRDSFullAccess + - Download SHA-256: `a74f4a452aaeb0bc7a5b9ff276c8b28a994b86155ddb8c1f37eb9a87daba1834`. +- After: v11; AWS creation date `2023-03-15T13:44:54Z`; commit `45d10de95790add7451389df3a4481c257521879`. + - Snapshot: https://github.com/zoph-io/IAMTrail/blob/45d10de95790add7451389df3a4481c257521879/policies/AmazonRDSFullAccess + - Raw: https://raw.githubusercontent.com/zoph-io/IAMTrail/45d10de95790add7451389df3a4481c257521879/policies/AmazonRDSFullAccess + - Download SHA-256: `e638fcec4569d615a915848e0d8d2e432593cc69ece1e20027dc719d9df6b4db`. + +None. Both PolicyVersion.Document objects are copied unchanged from the archive. + +### PLH5-A08: AmazonS3ReadOnlyAccess v2 -> v3 + +Expected: **pass**. Adds s3:Describe* metadata actions. Existing s3:Get* and s3:List* data access is unchanged; no new principal or write permission is added. + +- Before: v2; AWS creation date `2021-09-27T20:24:58Z`; commit `f1eeaa0507b249a144f0331d9c8d9fc84d20223b`. + - Snapshot: https://github.com/zoph-io/IAMTrail/blob/f1eeaa0507b249a144f0331d9c8d9fc84d20223b/policies/AmazonS3ReadOnlyAccess + - Raw: https://raw.githubusercontent.com/zoph-io/IAMTrail/f1eeaa0507b249a144f0331d9c8d9fc84d20223b/policies/AmazonS3ReadOnlyAccess + - Download SHA-256: `c454b834083661d625b47994750651b328540dc15061474d359aec38bd223968`. +- After: v3; AWS creation date `2023-08-10T21:31:39Z`; commit `cf1e4413c77fc0810114b72e35162510bce97756`. + - Snapshot: https://github.com/zoph-io/IAMTrail/blob/cf1e4413c77fc0810114b72e35162510bce97756/policies/AmazonS3ReadOnlyAccess + - Raw: https://raw.githubusercontent.com/zoph-io/IAMTrail/cf1e4413c77fc0810114b72e35162510bce97756/policies/AmazonS3ReadOnlyAccess + - Download SHA-256: `7269a302edcc46896fa987b10072f7044675db0fcef559a83dac68442658b559`. + +None. Both PolicyVersion.Document objects are copied unchanged from the archive. + +### PLH5-A09: AmazonSSMManagedInstanceCore v1 -> v2 + +Expected: **review**. Adds ssm:GetParameter on *. Parameter values are sensitive, but ssm:GetParameters already covered the same resources. Review the additional API without claiming a newly reachable secret set or a proven escalation. + +- Before: v1; AWS creation date `2019-03-15T17:22:12Z`; commit `4bca9c8425f66d450210ba326afe300cfb98fb8e`. + - Snapshot: https://github.com/zoph-io/IAMTrail/blob/4bca9c8425f66d450210ba326afe300cfb98fb8e/policies/AmazonSSMManagedInstanceCore + - Raw: https://raw.githubusercontent.com/zoph-io/IAMTrail/4bca9c8425f66d450210ba326afe300cfb98fb8e/policies/AmazonSSMManagedInstanceCore + - Download SHA-256: `408301ad2af91843c2209d676aac74180613afb77d7a2152a77279806eda9bc6`. +- After: v2; AWS creation date `2019-05-23T16:54:21Z`; commit `caf80dacdf9b79240b96a614d40c85a9cd3c9c3b`. + - Snapshot: https://github.com/zoph-io/IAMTrail/blob/caf80dacdf9b79240b96a614d40c85a9cd3c9c3b/policies/AmazonSSMManagedInstanceCore + - Raw: https://raw.githubusercontent.com/zoph-io/IAMTrail/caf80dacdf9b79240b96a614d40c85a9cd3c9c3b/policies/AmazonSSMManagedInstanceCore + - Download SHA-256: `f0ecfbd1496d37120e6ffea4d0542e55850b1237746e79f3314451c2b26b506e`. + +None. Both PolicyVersion.Document objects are copied unchanged from the archive. + +### PLH5-A10: CloudWatchReadOnlyAccess v4 -> v5 + +Expected: **pass**. Adds oam:ListSinks and oam:ListAttachedLinks, with the latter limited to sink ARNs. These are observability configuration listings, not telemetry reads or writes. + +- Before: v4; AWS creation date `2020-07-17T17:49:09Z`; commit `5811085d78f18a64460f9810b42671fea4141a05`. + - Snapshot: https://github.com/zoph-io/IAMTrail/blob/5811085d78f18a64460f9810b42671fea4141a05/policies/CloudWatchReadOnlyAccess + - Raw: https://raw.githubusercontent.com/zoph-io/IAMTrail/5811085d78f18a64460f9810b42671fea4141a05/policies/CloudWatchReadOnlyAccess + - Download SHA-256: `a98b3aa56ba7c76e427b4a184f0b6411e8114cae288872727ba919c057853dc1`. +- After: v5; AWS creation date `2022-11-27T13:08:46Z`; commit `33e468411837ccfc29feffb32b6ea8cb49b748f3`. + - Snapshot: https://github.com/zoph-io/IAMTrail/blob/33e468411837ccfc29feffb32b6ea8cb49b748f3/policies/CloudWatchReadOnlyAccess + - Raw: https://raw.githubusercontent.com/zoph-io/IAMTrail/33e468411837ccfc29feffb32b6ea8cb49b748f3/policies/CloudWatchReadOnlyAccess + - Download SHA-256: `03f9ca687146cf6e12cf15679aa28af922fb5b040e802766321525cc94a4d81a`. + +None. Both PolicyVersion.Document objects are copied unchanged from the archive. + +## Modelled AWS and Rhino cases + +### PLH5-A11: S3: remove the required KMS-key upload guardrail + +Kind: **modelled**. Expected: **stop**. + +Use the AWS specific-KMS-key Deny example unchanged for before; remove that statement for after. + +Deleting the explicit deny permits otherwise-authorised uploads to use a different KMS key. This weakens the encryption-key requirement; it does not itself grant PutObject. + +- https://docs.aws.amazon.com/AmazonS3/latest/userguide/example-bucket-policies.html + +### PLH5-A12: KMS key policy: service-only grant creation becomes unrestricted + +Kind: **modelled**. Expected: **stop**. + +Wrap the AWS persistent-resource grant statement in a 2012-10-17 policy; remove its Condition only. + +Removing kms:GrantIsForAWSResource permits the named key user to create grants directly. The key remains the policy attachment scope, but grant delegation is no longer restricted to integrated AWS services. + +- https://docs.aws.amazon.com/kms/latest/developerguide/key-policy-default.html + +### PLH5-A13: Secrets Manager: grant one named role read access to the attached secret + +Kind: **modelled**. Expected: **review**. + +Use the EC2RoleToAccessSecrets resource-policy example unchanged as after; before contains no statements. + +A named role gains GetSecretValue on the secret carrying this resource policy. Resource * denotes that attached secret; confirm the role and business need rather than infer public access. + +- https://docs.aws.amazon.com/secretsmanager/latest/userguide/auth-and-access_resource-policies.html + +### PLH5-A14: SQS: SNS publisher loses the exact source-topic restriction + +Kind: **modelled**. Expected: **stop**. + +Wrap the AWS SNS-to-SQS example with Version 2012-10-17; remove aws:SourceArn for after. + +The queue now accepts SendMessage from the SNS service without checking the source topic. The service principal remains fixed, but any eligible SNS topic can use the grant. + +- https://docs.aws.amazon.com/sns/latest/dg/sns-access-policy-use-cases.html + +### PLH5-A15: SNS identity policy: add Publish on one topic + +Kind: **modelled**. Expected: **review**. + +Convert the documented named-account Publish statement into an identity policy by removing Principal, retaining its action and topic ARN; compare against no grant. + +Adds publishing to one named topic. This is scoped message injection authority requiring review; it does not change the topic policy or open access to everyone. + +- https://docs.aws.amazon.com/sns/latest/dg/sns-access-policy-use-cases.html + +### PLH5-A16: Lambda identity policy: invoke one function only through its authenticated URL + +Kind: **modelled**. Expected: **review**. + +Convert the documented authenticated function-URL resource policy to an identity policy by removing Principal from both statements; retain all ARNs, actions and conditions. + +Both InvokeFunctionUrl and InvokeFunction are limited to one function. AWS_IAM and InvokedViaFunctionUrl conditions constrain the new invocation route; review this scoped capability. + +- https://docs.aws.amazon.com/lambda/latest/dg/urls-auth.html + +### PLH5-A17: ECR repository policy: existing named pull users gain image push + +Kind: **modelled**. Expected: **review**. + +After is the AWS AllowPushPull example unchanged. Before removes CompleteLayerUpload, InitiateLayerUpload, PutImage and UploadLayerPart, leaving the same users and pull checks. + +The same two named users gain image upload and PutImage on the repository carrying this policy. Review the new deployment capability; Resource * is local to the attached repository, not all repositories. + +- https://docs.aws.amazon.com/AmazonECR/latest/userguide/repository-policy-examples.html + +### PLH5-A18: EC2: remove the IMDSv2 requirement from an instance launch policy + +Kind: **modelled**. Expected: **stop**. + +Combine the documented scoped RunInstances example and RequireImdsV2 deny for before; remove only the deny for after. + +RunInstances remains authorised on the listed resources, but its explicit deny for missing required metadata tokens is removed. Launches using IMDSv1 become possible where service defaults permit them. + +- https://docs.aws.amazon.com/AWSEC2/latest/UserGuide/ExamplePolicies_EC2.html + +### PLH5-A19: SSM Parameter Store: protected parameter overwrites become permitted + +Kind: **modelled**. Expected: **stop**. + +Use the AWS ssm:Overwrite example unchanged for before; delete its explicit deny for after. + +The PutParameter allow already covers every parameter in the example account and region. Removing the ssm:Overwrite deny permits overwriting existing values, including sensitive configuration. + +- https://docs.aws.amazon.com/systems-manager/latest/userguide/parameter-store-policy-conditions.html + +### PLH5-A20: Rhino method 7: user-policy attachment loses its managed-policy allowlist + +Kind: **modelled**. Expected: **stop**. + +Use the AWS attach/detach managed-policy allowlist example unchanged for before; remove only Condition for after. Rhino supplies the escalation analysis. + +AttachUserPolicy can now attach any managed policy to any user, including AdministratorAccess. This opens the policy-attachment escalation described by Rhino; the prior iam:PolicyARN allowlist blocked it. + +- https://docs.aws.amazon.com/IAM/latest/UserGuide/reference_policies_examples_iam_limit-managed.html +- https://rhinosecuritylabs.com/aws/aws-privilege-escalation-methods-mitigation/ + +### PLH5-A21: STS role trust: the named user can assume the role without MFA + +Kind: **modelled**. Expected: **stop**. + +Use the AWS CLI anika trust-policy example unchanged; remove the MFA Condition only. + +The trusted user stays fixed, but removing aws:multifactorAuthPresent eliminates the MFA requirement for AssumeRole. No new principal is needed for this security regression. + +- https://docs.aws.amazon.com/cli/latest/userguide/cli-configure-role.html + +### PLH5-A22: DynamoDB identity policy: add Query on Books and its indexes + +Kind: **modelled**. Expected: **review**. + +Project the documented Books table/index policy down to its existing dynamodb:Query action; retain both resource ARNs; compare against no grant. + +Query can now return data from one named table and its indexes. This is new scoped data access; review its need without treating the index suffix as every table. + +- https://docs.aws.amazon.com/amazondynamodb/latest/developerguide/iam-policy-specific-table-indexes.html + +### PLH5-A23: RDS IAM authentication: add one database-user login + +Kind: **modelled**. Expected: **review**. + +Use the single-DB-user AWS example unchanged as after; before has no statements. + +Adds rds-db:connect for db_user on one DB resource ID. Successful login still requires database-side IAM authentication and user configuration; the IAM grant warrants review. + +- https://docs.aws.amazon.com/AmazonRDS/latest/UserGuide/UsingWithRDS.IAMDBAuth.IAMPolicy.html + +### PLH5-A24: EventBridge event bus: add one named external account publisher + +Kind: **modelled**. Expected: **stop**. + +Use the AWS default-event-bus cross-account policy unchanged as after; before has no statements. Preserve the account ID in the JSON, even though surrounding AWS prose uses a different illustrative ID. + +The event bus gains a cross-account PutEvents grant to the named account root principal. External event injection crosses the account boundary; a narrow bus ARN does not remove that risk. + +- https://docs.aws.amazon.com/eventbridge/latest/userguide/eb-event-bus-example-policy-cross-account.html + +### PLH5-A25: Glue Data Catalog: add table creation in one named database + +Kind: **modelled**. Expected: **review**. + +Combine the AWS read-Books example and the AWS scoped CreateTable example for after; before contains the read example only. Both are published examples from the same page. + +Adds CreateTable for db1/tbl1 with the required database and catalogue ancestors. This is scoped metadata creation, not DevEndpoint creation, PassRole or access to every database. + +- https://docs.aws.amazon.com/glue/latest/dg/security_iam_id-based-policy-examples.html + +### PLH5-A26: KMS key policy: remove both required encryption-context values + +Kind: **modelled**. Expected: **stop**. + +Wrap the AWS Department/Project Decrypt statement as a policy; remove Condition for after. + +The named application role can decrypt without the Department=IT and Project=Alpha encryption-context checks. The policy no longer isolates this key use by that context. + +- https://docs.aws.amazon.com/kms/latest/developerguide/conditions-kms.html + +### PLH5-A27: Secrets Manager: remove the VPC-endpoint retrieval guardrail + +Kind: **modelled**. Expected: **stop**. + +Combine the AWS named-role GetSecretValue allow and sourceVpce deny examples; remove only the deny for after. + +The named role retains GetSecretValue, but its attached secret no longer denies requests outside vpce-12345678. Otherwise-authorised off-endpoint reads are now possible. + +- https://docs.aws.amazon.com/secretsmanager/latest/userguide/auth-and-access_resource-policies.html + +### PLH5-A28: SQS: restrict an IP-based all-actions grant to send-only and block one address + +Kind: **modelled**. Expected: **pass**. + +Compare the two AWS published IP examples directly: before is the all-actions /24 grant; after is the send-only grant with an IP exclusion and explicit deny. No policy values are invented. + +Within the same queue and /24 network, Allow narrows from sqs:* to SendMessage, excludes one address and adds an explicit deny for that address. No permission is broadened. + +- https://docs.aws.amazon.com/AWSSimpleQueueService/latest/SQSDeveloperGuide/sqs-basic-examples-of-sqs-policies.html + +### PLH5-A29: SNS resource policy: bind S3 publishing to its source account + +Kind: **modelled**. Expected: **pass**. + +After is the published S3-to-SNS source-account example with Version 2012-10-17. Before removes only its Condition. + +Adding AWS:SourceAccount confines the existing S3 service grant to one source account. Topic, action and service principal remain unchanged. + +- https://docs.aws.amazon.com/sns/latest/dg/sns-access-policy-use-cases.html + +### PLH5-A30: Rhino method 16: add a DynamoDB-stream trigger route for new Lambda code + +Kind: **modelled**. Expected: **stop**. + +Reconstruct only the IAM action combination enumerated by Rhino method 16, using Resource * as the explicitly modelled unrestricted scope. Before has PassRole/CreateFunction; after adds CreateEventSourceMapping. This is not a captured deployed policy. + +CreateEventSourceMapping completes a documented execution route for an actor already able to pass roles and create Lambda functions. Exploitation still requires a usable stream and suitable execution-role permissions; direct InvokeFunction is not required. + +- https://rhinosecuritylabs.com/aws/aws-privilege-escalation-methods-mitigation/ + +## GMPP publications and data downloads + +Every link in the ProjectLens source fields is listed here. All files in this section use the Open Government Licence v3.0. Case fields identify the exact project record/column and the file SHA-256. + +### 2012-13: HO_Major_projects.csv + +- Publication: https://www.gov.uk/government/publications/home-office-major-projects-portfolio-data-2013 +- CSV: https://assets.publishing.service.gov.uk/media/5a74f33c40f0b6399b2af792/HO_Major_projects.csv +- SHA-256: `a6cd77f80e244d21121701703af1942a0c391871d03f5a51699ccebf556af5d8`. +- Cases: PLH5-B05, PLH5-B06. + +### 2012-13: gmpp-data-MoJ-q2-2012-13.csv + +- Publication: https://www.gov.uk/government/publications/government-major-projects-portfolio-data-for-moj-2013--2 +- CSV: https://assets.publishing.service.gov.uk/media/5a7b88a5ed915d4147620fed/gmpp-data-MoJ-q2-2012-13.csv +- SHA-256: `99508c923a01dd8be3cd58df5e24bf7ba296eea54b22d2da25c44005b13aa4d7`. +- Cases: PLH5-B07. + +### 2012-13: gmpp-data-DCMS-q2-2012-13.csv + +- Publication: https://www.gov.uk/government/publications/government-major-projects-portfolio-data-for-dcms-2013 +- CSV: https://assets.publishing.service.gov.uk/media/5a7bffe7ed915d01ba1ca7f4/gmpp-data-DCMS-q2-2012-13.csv +- SHA-256: `f2cc82bfb9f0ac3654c8da984793b77184a92e0d156eaf93bccb2c1efc4402cc`. +- Cases: PLH5-B01. + +### 2012-13: gmpp-data-DH-q2-2012-13.csv + +- Publication: https://www.gov.uk/government/publications/government-major-projects-portfolio-data-for-department-of-health-2013--2 +- CSV: https://assets.publishing.service.gov.uk/media/5a7cab85ed915d6969f46841/gmpp-data-DH-q2-2012-13.csv +- SHA-256: `f631a2722cf4dbd3a8df742701cd21d8295297441e2f5af3ddfb458e9a359d33`. +- Cases: PLH5-B09, PLH5-B40. + +### 2013-14: Government_Major_Projects_Portfolio_data__September_2013__CSV_.csv + +- Publication: https://www.gov.uk/government/publications/major-projects-authority-annual-report-2014 +- CSV: https://assets.publishing.service.gov.uk/media/5a7ea47a40f0b62305b823ee/Government_Major_Projects_Portfolio_data__September_2013__CSV_.csv +- SHA-256: `67cb811e8bf3f807ecee8cf177e36036bb6c0810a7c6f4077364cfebabb302a1`. +- Cases: PLH5-B01, PLH5-B05, PLH5-B06, PLH5-B07, PLH5-B08, PLH5-B09, PLH5-B10, PLH5-B38, PLH5-B39, PLH5-B40. + +### 2014-15: GMPP_data_september_2014.csv + +- Publication: https://www.gov.uk/government/publications/major-projects-authority-annual-report-2015 +- CSV: https://assets.publishing.service.gov.uk/media/5a801db6ed915d74e33f88a0/GMPP_data_september_2014.csv +- SHA-256: `addde3f42fb6e4408c30e62d8cf3bf32eb5267d10802e13b3718faf051aef117`. +- Cases: PLH5-B08, PLH5-B10, PLH5-B38, PLH5-B39. + +### 2015-16: government_major_projects_portfolio_data_september_2015.csv + +- Publication: https://www.gov.uk/government/news/ipa-annual-report-on-major-government-projects-shows-improvements +- CSV: https://assets.publishing.service.gov.uk/media/5a80a49ce5274a2e8ab51547/government_major_projects_portfolio_data_september_2015.csv +- SHA-256: `c03928d2b93b02065869fb225a61ad88a44a1328c971a4c58e88349a74a32937`. +- Cases: PLH5-B03. + +### 2016-17: Annual_Report_-_consolidated_data_and_narratives.csv + +- Publication: https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2017 +- CSV: https://assets.publishing.service.gov.uk/media/5a821ed6e5274a2e8ab57995/Annual_Report_-_consolidated_data_and_narratives.csv +- SHA-256: `1dc7c1598ab6955d5a1a704117b239350aef956b4b5aa141facaaadd331c6238`. +- Cases: PLH5-B03, PLH5-B04. + +### 2017-18: csv-ipa-government-major-projects-portfolio-data-september-2017.csv + +- Publication: https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2018 +- CSV: https://assets.publishing.service.gov.uk/media/5b3e2e2340f0b678bc5d018c/csv-ipa-government-major-projects-portfolio-data-september-2017.csv +- SHA-256: `915cf52ff57a180c9f3989e9e29e56594efd81da1e66fa3757d66a145b71f726`. +- Cases: PLH5-B02, PLH5-B04, PLH5-B37. + +### 2018-19: Annual_Report_on_Major_Projects_2018_to_2019__consolidated_data_and_narratives.csv + +- Publication: https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2019 +- CSV: https://assets.publishing.service.gov.uk/media/5d2dd08d40f0b64a8626b762/Annual_Report_on_Major_Projects_2018_to_2019__consolidated_data_and_narratives.csv +- SHA-256: `c22caa602ec3a7d9cc64cb20d559dbd5dbd0b9ceae5b4184675f247138d5b8b8`. +- Cases: PLH5-B02, PLH5-B27, PLH5-B37. + +### 2019-20: GMPP_Government_Major_Projects_Portfolio_data_September_2019.csv + +- Publication: https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2020 +- CSV: https://assets.publishing.service.gov.uk/media/5f05de523a6f40041036a2ec/GMPP_Government_Major_Projects_Portfolio_data_September_2019.csv +- SHA-256: `0a9b082d6d1cd4c0887f94c6853b5e5ed5892c7c60a0d19ea9e7f839b9b7db89`. +- Cases: PLH5-B25, PLH5-B26, PLH5-B27, PLH5-B28. + +### 2020-21: GMPP_Government_Major_Projects_Portofolio_AR_Data_March_2021.csv + +- Publication: https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021 +- CSV: https://assets.publishing.service.gov.uk/media/60eecae48fa8f50c7ca55af1/GMPP_Government_Major_Projects_Portofolio_AR_Data_March_2021.csv +- SHA-256: `88a38d6ab1e1865a96aebde3d18e98150e79b4167b92b82dff15dcb96fa784f1`. +- Cases: PLH5-B23, PLH5-B24, PLH5-B25, PLH5-B26, PLH5-B28. + +### 2021-22: GMPP_Government_Major_Projects_Portfolio_AR_Data_March_2022.csv + +- Publication: https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022 +- CSV: https://assets.publishing.service.gov.uk/media/62d6c047e90e071e753d6936/GMPP_Government_Major_Projects_Portfolio_AR_Data_March_2022.csv +- SHA-256: `f34d32e4ed93a34cb9e7500491bba4cfa9568999c7dfabcbe74e0cc4cf538f2c`. +- Cases: PLH5-B22, PLH5-B23, PLH5-B24. + +### 2022-23: GMPP_Government_Major_Projects_Portofolio_AR_Data_March_2023.csv + +- Publication: https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23 +- CSV: https://assets.publishing.service.gov.uk/media/64b79c5171749c001389ee41/GMPP_Government_Major_Projects_Portofolio_AR_Data_March_2023.csv +- SHA-256: `ecd3756718a71e6f52fb25050caba535d64e7f5b21f6db361cfa10859a4364ac`. +- Cases: PLH5-B18, PLH5-B19, PLH5-B20, PLH5-B21, PLH5-B22, PLH5-B34. + +### 2023-24: Government_Major_Projects_Portofolio_AR_Data_March_2024.csv + +- Publication: https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24 +- CSV: https://assets.publishing.service.gov.uk/media/6787e8ee1124a2c3ceb646be/Government_Major_Projects_Portofolio_AR_Data_March_2024.csv +- SHA-256: `29596242964ff850351b9d091ae7db2584e1c8cdec3b7c8e53ca661479db614b`. +- Cases: PLH5-B11, PLH5-B12, PLH5-B13, PLH5-B14, PLH5-B15, PLH5-B16, PLH5-B17, PLH5-B18, PLH5-B19, PLH5-B20, PLH5-B21, PLH5-B29, PLH5-B30, PLH5-B31, PLH5-B32, PLH5-B33, PLH5-B34, PLH5-B35, PLH5-B36. + +### 2024-25: nista_annual_report_data_2425.csv + +- Publication: https://www.gov.uk/government/publications/nista-annual-report-2024-2025 +- CSV: https://assets.publishing.service.gov.uk/media/6895fbb63080e72710b2e2ef/nista_annual_report_data_2425.csv +- SHA-256: `cac14ed4e6a90a81486bdc24295ea40996e7fd6fcd3834e3ffad8a2685f8c8b3`. +- Cases: PLH5-B11, PLH5-B12, PLH5-B13, PLH5-B14, PLH5-B15, PLH5-B16, PLH5-B17, PLH5-B29, PLH5-B30, PLH5-B31, PLH5-B32, PLH5-B33, PLH5-B35, PLH5-B36. + +## Doubtful or scope-sensitive labels + +These caveats are included in the ProjectLens case objects as `labelCaveat`. They must remain visible when reporting results; they are not undisclosed clean ground truth. + +- **PLH5-B02 — Government Hubs Programme (contradiction)**: The narrative acknowledges individual and tranche movements. The label applies the C2 rule to its explicit programme-wide on-schedule claim and unstated programme-end extension. +- **PLH5-B05 — National Crime Agency (NCA) (contradiction)**: The successful launch and formal programme closure can be different milestones. This label follows the C2 rule for an unqualified delivered-to-schedule claim; it is not an allegation of late operational launch. +- **PLH5-B09 — E&N Herts NHS Trust - Lister Hospital ('Our Changing Hospitals' Phase 4 Programme) (contradiction)**: Consolidation is the named delivery outcome, rather than an explicit formal-closure date. The commentary and published end require interpretation of that scope; the label treats consolidation as the programme delivery finish. +- **PLH5-B10 — The Materiel Strategy (contradiction)**: The match-fit transformation end-state may precede administrative or supplier-contract closure. This label follows C2 by treating the stated transformation completion as the current programme finish; the scope distinction is uncertain. +- **PLH5-B40 — Mersey Care NHS LIFT scheme (TIME - To Improve Mental Health Environments) (published-date-check)**: The commentary explicitly dates the first part of a phased project, rather than an unqualified whole-project closure. It still places that completion after the published project end, so this is a date check rather than an assertion that the whole project closes in December 2015. + +Policy calibration also needs care: A04 and A09 are deliberately review because the earlier policy already allowed the same logs/parameter resources through other APIs. A06 treats vulnerability findings and lifecycle configuration as metadata, which a stricter organisation could classify as sensitive. A30 requires a usable DynamoDB stream and adequate Lambda execution-role permissions; it demonstrates a newly enabled route, not proof that arbitrary role escalation will succeed in an unspecified account. + +## Validation + +All acceptance quotas, source hashes, source-cell equality, date arithmetic, exact managed-policy snapshots, duplicate checks and explicit name/ID exclusions passed. Neither target tool was executed. + +Validation result retained at `.work/validation.json`. No accuracy score was calculated and no engine tuning was performed. diff --git a/bench/real-cases/floors.json b/bench/real-cases/floors.json new file mode 100644 index 0000000..b3512b0 --- /dev/null +++ b/bench/real-cases/floors.json @@ -0,0 +1,7 @@ +{ + "projectlens-heldout.json": 32, + "projectlens-heldout2.json": 29, + "projectlens-heldout3.json": 28, + "projectlens-heldout4.json": 28, + "projectlens-heldout5.json": 29 +} diff --git a/bench/real-cases/projectlens-heldout.json b/bench/real-cases/projectlens-heldout.json new file mode 100644 index 0000000..191d17b --- /dev/null +++ b/bench/real-cases/projectlens-heldout.json @@ -0,0 +1,943 @@ +{ + "meta": { + "description": "Held-out GMPP pairs for ProjectLens narrative/date contradiction scoring. Not for tuning.", + "yearConvention": "prevYear/year use ProjectLens gmpp.json convention: year N = the release whose data is as at 31 Mar N (2020 = 2019-20 release, data as at 30 Sep 2019).", + "labelRules": { + "contradiction": "end date moved >14 days and the narrative says unchanged/the same, or names a current end date >14 days from the published one, without stating the actual move", + "explained": "end date moved >14 days and the narrative states the change", + "no-move": "published end date identical in both releases (daysMoved = 0)" + }, + "narrativeVerbatim": "Narrative is the exact cell text from the current-year CSV (2019-20 and 2020-21 decoded as Windows-1252, others UTF-8), including line breaks, non-breaking spaces and any mojibake present in the source.", + "licence": "Contains public sector information licensed under the Open Government Licence v3.0." + }, + "cases": [ + { + "id": "PLH-B01", + "gmppId": "MOJ_0049_2021-Q1", + "project": "10,000 Additional Prison Places Programme - Estate Expansions", + "department": "MOJ", + "prevYear": 2021, + "year": 2022, + "prevRelease": "2020-21", + "release": "2021-22", + "prevEnd": "2027-03-30", + "curEnd": "2025-05-01", + "daysMoved": -698, + "narrative": "Compared to 20/21 Q4, the project end date has remained static.", + "label": "contradiction", + "why": "End date moved 698 days earlier (30 Mar 2027 -> 1 May 2025). The whole narrative says the end date 'has remained static' and states no change.", + "contradictionType": "claims-unchanged", + "inTuningPairsFile": false, + "source": { + "current": { + "release": "IPA Annual Report 2021-22 (data as at 31 Mar 2022)", + "csv": "https://assets.publishing.service.gov.uk/media/62d6c047e90e071e753d6936/GMPP_Government_Major_Projects_Portfolio_AR_Data_March_2022.csv" + }, + "previous": { + "release": "IPA Annual Report 2020-21 (data as at 31 Mar 2021)", + "csv": "https://assets.publishing.service.gov.uk/media/60eecae48fa8f50c7ca55af1/GMPP_Government_Major_Projects_Portofolio_AR_Data_March_2021.csv" + }, + "fields": "GMPP ID, Project Name, Department, 'Project - End Date (Latest Approved End Date)' / 'End Date', 'Departmental narrative on schedule...' / 'Schedule Narrative'" + } + }, + { + "id": "PLH-B02", + "gmppId": "MOD_0104_1617-Q1", + "project": "Armour Main Battle Tank", + "department": "MOD", + "prevYear": 2020, + "year": 2021, + "prevRelease": "2019-20", + "release": "2020-21", + "prevEnd": "2028-07-31", + "curEnd": "2026-06-01", + "daysMoved": -791, + "narrative": "Compared to financial year 19/20-Q2, the project's end-date remained scheduled to finish on 01 June 2026 . This is primarily due to the following factors: \r\n\r\nSchedule dates have been revised during contract negotiation contract signature in March 21. Key milestones (50% confidence) are: \r\n- Initial Operating Capability (1 squadron of 18 tanks with crews trained at appropriate collective training standard) - November 27.\r\n- Full Operating Capability (148 tanks delivered): November 30.\r\n\r\nThese dates are later than envisaged at Initial Gate. This slip has arisen during contractual negotiations due to the perception in Industry of delivery and cost risk around the Design and Manufacture phases, reflecting that which has been witnessed from other projects.\r\n", + "label": "contradiction", + "why": "End date moved 791 days earlier (31 Jul 2028 -> 1 Jun 2026). The narrative says the end date 'remained scheduled to finish on 01 June 2026'. Its later text is about milestones (IOC, FOC) slipping later, not about the end date moving.", + "contradictionType": "claims-unchanged", + "doubt": "The narrative does say 'Schedule dates have been revised', but it ties that to milestones moving later, while the end date moved earlier. A lenient reader might count that as stating the move.", + "prevProject": "Armour MBT 2025", + "inTuningPairsFile": true, + "source": { + "current": { + "release": "IPA Annual Report 2020-21 (data as at 31 Mar 2021)", + "csv": "https://assets.publishing.service.gov.uk/media/60eecae48fa8f50c7ca55af1/GMPP_Government_Major_Projects_Portofolio_AR_Data_March_2021.csv" + }, + "previous": { + "release": "IPA Annual Report 2019-20 (data as at 30 Sep 2019)", + "csv": "https://assets.publishing.service.gov.uk/media/5f05de523a6f40041036a2ec/GMPP_Government_Major_Projects_Portfolio_data_September_2019.csv" + }, + "fields": "GMPP ID, Project Name, Department, 'Project - End Date (Latest Approved End Date)' / 'End Date', 'Departmental narrative on schedule...' / 'Schedule Narrative'" + } + }, + { + "id": "PLH-B03", + "gmppId": "MOD_0104_1617-Q1", + "project": "Armour MBT", + "department": "MOD", + "prevYear": 2023, + "year": 2024, + "prevRelease": "2022-23", + "release": "2023-24", + "prevEnd": "2031-05-22", + "curEnd": "2030-06-30", + "daysMoved": -326, + "narrative": "Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained scheduled to finish on 2030-06-30. This is primarily due to the following factors. The programme remains on track to achieve its key milestones. These are. Initial Operating Capability (1 Squadron of tanks with crews trained to the appropriate standard and held at readiness) – November 2027. Full Operating Capability (148 tanks delivered and all Key User Requirements met subject to subsequent approvals). November 2030. The platform Critical Design Review was achieved in January 2023 providing confidence in the design and readiness for the next phases of delivery. ", + "label": "contradiction", + "why": "End date moved 326 days earlier (22 May 2031 -> 30 Jun 2030). The narrative says it 'remained scheduled to finish on 2030-06-30' and 'remains on track'. No move is stated.", + "contradictionType": "claims-unchanged", + "prevProject": "Armour MBT 2025", + "inTuningPairsFile": true, + "source": { + "current": { + "release": "IPA Annual Report 2023-24 (data as at 31 Mar 2024)", + "csv": "https://assets.publishing.service.gov.uk/media/6787e8ee1124a2c3ceb646be/Government_Major_Projects_Portofolio_AR_Data_March_2024.csv" + }, + "previous": { + "release": "IPA Annual Report 2022-23 (data as at 31 Mar 2023)", + "csv": "https://assets.publishing.service.gov.uk/media/64b79c5171749c001389ee41/GMPP_Government_Major_Projects_Portofolio_AR_Data_March_2023.csv" + }, + "fields": "GMPP ID, Project Name, Department, 'Project - End Date (Latest Approved End Date)' / 'End Date', 'Departmental narrative on schedule...' / 'Schedule Narrative'" + } + }, + { + "id": "PLH-B04", + "gmppId": "MOD_0121_2021-Q4", + "project": "Collective Training Transformation Programme", + "department": "MOD", + "prevYear": 2023, + "year": 2024, + "prevRelease": "2022-23", + "release": "2023-24", + "prevEnd": "2040-03-31", + "curEnd": "2032-03-31", + "daysMoved": -2922, + "narrative": "Compared to financial year 22/23-Q4, the programme's end-date at 23/24-Q4 remained scheduled to finish on 2032-03-31. ", + "label": "contradiction", + "why": "End date moved 2,922 days earlier (31 Mar 2040 -> 31 Mar 2032). The one-sentence narrative says it 'remained scheduled to finish on 2032-03-31'.", + "contradictionType": "claims-unchanged", + "inTuningPairsFile": true, + "source": { + "current": { + "release": "IPA Annual Report 2023-24 (data as at 31 Mar 2024)", + "csv": "https://assets.publishing.service.gov.uk/media/6787e8ee1124a2c3ceb646be/Government_Major_Projects_Portofolio_AR_Data_March_2024.csv" + }, + "previous": { + "release": "IPA Annual Report 2022-23 (data as at 31 Mar 2023)", + "csv": "https://assets.publishing.service.gov.uk/media/64b79c5171749c001389ee41/GMPP_Government_Major_Projects_Portofolio_AR_Data_March_2023.csv" + }, + "fields": "GMPP ID, Project Name, Department, 'Project - End Date (Latest Approved End Date)' / 'End Date', 'Departmental narrative on schedule...' / 'Schedule Narrative'" + } + }, + { + "id": "PLH-B05", + "gmppId": "MOD_0091_1415-Q3", + "project": "Armoured Cavalry 2025", + "department": "MOD", + "prevYear": 2023, + "year": 2024, + "prevRelease": "2022-23", + "release": "2023-24", + "prevEnd": "2030-03-31", + "curEnd": "2025-04-30", + "daysMoved": -1796, + "narrative": "Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained scheduled to finish on 2025-04-30. This is primarily due to the following factors. A jointly agreed, risk adjusted reset schedule is in place out to Full Operating Capability; the programme is operating to this pending formal approval of the schedule by the department and HM Treasury. ", + "label": "contradiction", + "why": "End date moved 1,796 days earlier (31 Mar 2030 -> 30 Apr 2025). The narrative says it 'remained scheduled to finish on 2025-04-30'.", + "contradictionType": "claims-unchanged", + "doubt": "It also mentions 'a jointly agreed, risk adjusted reset schedule' that is pending approval. That signals schedule change but does not say the end date moved. The published date returned to the value from two releases earlier.", + "inTuningPairsFile": true, + "source": { + "current": { + "release": "IPA Annual Report 2023-24 (data as at 31 Mar 2024)", + "csv": "https://assets.publishing.service.gov.uk/media/6787e8ee1124a2c3ceb646be/Government_Major_Projects_Portofolio_AR_Data_March_2024.csv" + }, + "previous": { + "release": "IPA Annual Report 2022-23 (data as at 31 Mar 2023)", + "csv": "https://assets.publishing.service.gov.uk/media/64b79c5171749c001389ee41/GMPP_Government_Major_Projects_Portofolio_AR_Data_March_2023.csv" + }, + "fields": "GMPP ID, Project Name, Department, 'Project - End Date (Latest Approved End Date)' / 'End Date', 'Departmental narrative on schedule...' / 'Schedule Narrative'" + } + }, + { + "id": "PLH-B06", + "gmppId": "FCO_0010_1617-Q3", + "project": "Echo 2 Programme", + "department": "FCDO", + "prevYear": 2023, + "year": 2024, + "prevRelease": "2022-23", + "release": "2023-24", + "prevEnd": "2024-07-31", + "curEnd": "2025-01-23", + "daysMoved": 176, + "narrative": "The current forecast end date for the Programme is Q4 23/24 following the re-baselining in January 2024 as a result of significant delays to the design, build and test phase. The authority has been working closely with the suppliers to increase confidence in this revised delivery timeline. \n\nDespite the delays the Programme remains within the FBC approved spend envelope despite the delayed profile for benefits realisation.", + "label": "contradiction", + "why": "End date moved 176 days later (31 Jul 2024 -> 23 Jan 2025). The narrative names the current forecast end date as 'Q4 23/24' (by 31 Mar 2024). That is about 300 days before the published date, and earlier even than the previous one.", + "contradictionType": "names-different-date", + "doubt": "It mentions 're-baselining in January 2024' because of delays, so it states that a change happened, but to a date that contradicts the column. 'Q4 23/24' may be a typo for Q4 24/25. Labelled 'contradiction' because the stated current end date is wrong by more than 14 days.", + "inTuningPairsFile": false, + "source": { + "current": { + "release": "IPA Annual Report 2023-24 (data as at 31 Mar 2024)", + "csv": "https://assets.publishing.service.gov.uk/media/6787e8ee1124a2c3ceb646be/Government_Major_Projects_Portofolio_AR_Data_March_2024.csv" + }, + "previous": { + "release": "IPA Annual Report 2022-23 (data as at 31 Mar 2023)", + "csv": "https://assets.publishing.service.gov.uk/media/64b79c5171749c001389ee41/GMPP_Government_Major_Projects_Portofolio_AR_Data_March_2023.csv" + }, + "fields": "GMPP ID, Project Name, Department, 'Project - End Date (Latest Approved End Date)' / 'End Date', 'Departmental narrative on schedule...' / 'Schedule Narrative'" + } + }, + { + "id": "PLH-B07", + "gmppId": "MOD_0136_2122-Q1", + "project": "Naval Support Integrated Global Network (NSIGN)", + "department": "MOD", + "prevYear": 2023, + "year": 2024, + "prevRelease": "2022-23", + "release": "2023-24", + "prevEnd": "2029-05-22", + "curEnd": "2030-03-22", + "daysMoved": 304, + "narrative": "Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 increased from 2029-03-22 to 2029-09-25. This is primarily due to the following factors. Changes in key milestones reflect the delay on transition to the Concept Phase, as a result of a protracted Strategic Outline Case approval and the reality of a Programme early in the scoping and solution design phase. \n ", + "label": "contradiction", + "why": "End date moved 304 days later (22 May 2029 -> 22 Mar 2030). The narrative says it 'increased from 2029-03-22 to 2029-09-25', which is 178 days before the published current date. The 'from' date also differs from the published previous date.", + "contradictionType": "names-different-date", + "doubt": "The narrative states an increase, but not the published one. It is a contradiction only under the 'names a different date' rule.", + "inTuningPairsFile": true, + "source": { + "current": { + "release": "IPA Annual Report 2023-24 (data as at 31 Mar 2024)", + "csv": "https://assets.publishing.service.gov.uk/media/6787e8ee1124a2c3ceb646be/Government_Major_Projects_Portofolio_AR_Data_March_2024.csv" + }, + "previous": { + "release": "IPA Annual Report 2022-23 (data as at 31 Mar 2023)", + "csv": "https://assets.publishing.service.gov.uk/media/64b79c5171749c001389ee41/GMPP_Government_Major_Projects_Portofolio_AR_Data_March_2023.csv" + }, + "fields": "GMPP ID, Project Name, Department, 'Project - End Date (Latest Approved End Date)' / 'End Date', 'Departmental narrative on schedule...' / 'Schedule Narrative'" + } + }, + { + "id": "PLH-B08", + "gmppId": "CO_0024_2021-Q2", + "project": "Civil Service Pensions 2015 Remedy", + "department": "CO", + "prevYear": 2024, + "year": 2025, + "prevRelease": "2023-24", + "release": "2024-25", + "prevEnd": "2024-09-30", + "curEnd": "2024-06-30", + "daysMoved": -92, + "narrative": "Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 changed from 30/07/2024 to 30/06/2025. This is primarily due to the following factors; the original programme closure date was predicated on the associated legislation being in place in 2022. The scheme regulations needed to remediate members did not come into force until 1 October 2023 which gave schemes 18 months to provide members with a choice i.e. 31 March 2025.\nFollowing our IPA review in February 2024 it was agreed that the Programme should be extended to 30 June 2025 then move to a portfolio delivery for the remaining 4 projects", + "label": "contradiction", + "why": "The published end date moved 92 days earlier (30 Sep 2024 -> 30 Jun 2024). The narrative says it 'changed from 30/07/2024 to 30/06/2025' and was 'extended to 30 June 2025': a later date, 365 days after the published current date.", + "contradictionType": "names-different-date", + "doubt": "Probably a year typo in the published End Date column. The narrative states a change, but in the opposite direction and to a different date. Labelled 'contradiction' because the narrative and the column disagree by a year.", + "inTuningPairsFile": false, + "source": { + "current": { + "release": "NISTA Annual Report 2024-25 (data as at 31 Mar 2025)", + "csv": "https://assets.publishing.service.gov.uk/media/6895fbb63080e72710b2e2ef/nista_annual_report_data_2425.csv" + }, + "previous": { + "release": "IPA Annual Report 2023-24 (data as at 31 Mar 2024)", + "csv": "https://assets.publishing.service.gov.uk/media/6787e8ee1124a2c3ceb646be/Government_Major_Projects_Portofolio_AR_Data_March_2024.csv" + }, + "fields": "GMPP ID, Project Name, Department, 'Project - End Date (Latest Approved End Date)' / 'End Date', 'Departmental narrative on schedule...' / 'Schedule Narrative'" + } + }, + { + "id": "PLH-B09", + "gmppId": "FCO_0012_1718-Q4", + "project": "Hera Programme", + "department": "FCDO", + "prevYear": 2020, + "year": 2021, + "prevRelease": "2019-20", + "release": "2020-21", + "prevEnd": "2021-10-31", + "curEnd": "2022-10-31", + "daysMoved": 365, + "narrative": "Compared to financial year 19/20-Q2, the project's end-date increased from 31 October 2021 to 31 October 2022 . This is primarily due to the following factors: The scheduled end date for the Hera programme is October 2022; the creation of FCDO from the former FCO and DFiD increased the scope and timeline compared to the previous Atlas programme. The programme has updated its release schedule accordingly, and is currently on track against its baselined plans for delivering the first implementation in 2021 as planned, with further functionality to be rolled out in phases accross 2022.", + "label": "explained", + "why": "Moved 365 days later. The narrative states 'end-date increased from 31 October 2021 to 31 October 2022' and gives the reason (FCDO merger). 'On track against its baselined plans' refers to releases, not the end date.", + "prevProject": "Atlas Programme (IPA ID 2410)", + "inTuningPairsFile": false, + "source": { + "current": { + "release": "IPA Annual Report 2020-21 (data as at 31 Mar 2021)", + "csv": "https://assets.publishing.service.gov.uk/media/60eecae48fa8f50c7ca55af1/GMPP_Government_Major_Projects_Portofolio_AR_Data_March_2021.csv" + }, + "previous": { + "release": "IPA Annual Report 2019-20 (data as at 30 Sep 2019)", + "csv": "https://assets.publishing.service.gov.uk/media/5f05de523a6f40041036a2ec/GMPP_Government_Major_Projects_Portfolio_data_September_2019.csv" + }, + "fields": "GMPP ID, Project Name, Department, 'Project - End Date (Latest Approved End Date)' / 'End Date', 'Departmental narrative on schedule...' / 'Schedule Narrative'" + } + }, + { + "id": "PLH-B10", + "gmppId": "DFT_0029_1617-Q1", + "project": "South West Route Capacity", + "department": "DFT", + "prevYear": 2020, + "year": 2021, + "prevRelease": "2019-20", + "release": "2020-21", + "prevEnd": "2019-12-31", + "curEnd": "2021-08-31", + "daysMoved": 609, + "narrative": "Compared to financial year 19/20-Q2, the project's end-date increased from 31 December 2019 to 31 August 2021 . This is primarily due to the following factors: The SWRC Programme has successfully completed all of its delivery milestones on schedule. The end-date was extended to August 2021 to account for internal governance and assurance activities.", + "label": "explained", + "why": "Moved 609 days later. The narrative states the increase to 31 August 2021 and 'The end-date was extended to August 2021'. 'Milestones on schedule' is about delivery milestones.", + "inTuningPairsFile": false, + "source": { + "current": { + "release": "IPA Annual Report 2020-21 (data as at 31 Mar 2021)", + "csv": "https://assets.publishing.service.gov.uk/media/60eecae48fa8f50c7ca55af1/GMPP_Government_Major_Projects_Portofolio_AR_Data_March_2021.csv" + }, + "previous": { + "release": "IPA Annual Report 2019-20 (data as at 30 Sep 2019)", + "csv": "https://assets.publishing.service.gov.uk/media/5f05de523a6f40041036a2ec/GMPP_Government_Major_Projects_Portfolio_data_September_2019.csv" + }, + "fields": "GMPP ID, Project Name, Department, 'Project - End Date (Latest Approved End Date)' / 'End Date', 'Departmental narrative on schedule...' / 'Schedule Narrative'" + } + }, + { + "id": "PLH-B11", + "gmppId": "DCMS_0011_1718-Q3", + "project": "5G Testbeds & Trials", + "department": "DCMS", + "prevYear": 2020, + "year": 2021, + "prevRelease": "2019-20", + "release": "2020-21", + "prevEnd": "2021-03-31", + "curEnd": "2022-03-31", + "daysMoved": 365, + "narrative": "Compared to financial year 19/20-Q2, the project's end-date increased from 31 March 2021 to 31 March 2022 . This is primarily due to the following factors: The Programme was granted an extension, and is scheduled to close 31 March 2022. The Programme currently remains on track to deliver and complete all projects by this date. However, it has been identified that the Programme would benefit from an extension of a further year to allow for a longer window for benefits to be realised. The team has also outlined key roles required to carry out post-project closure activities to ensure the Programme closes in a successful, controlled manner in the six month period following Programme closure if an extension were not permitted.", + "label": "explained", + "why": "Moved 365 days later. The narrative states the increase to 31 March 2022 and 'The Programme was granted an extension'. 'Remains on track... by this date' refers to the new date.", + "inTuningPairsFile": false, + "source": { + "current": { + "release": "IPA Annual Report 2020-21 (data as at 31 Mar 2021)", + "csv": "https://assets.publishing.service.gov.uk/media/60eecae48fa8f50c7ca55af1/GMPP_Government_Major_Projects_Portofolio_AR_Data_March_2021.csv" + }, + "previous": { + "release": "IPA Annual Report 2019-20 (data as at 30 Sep 2019)", + "csv": "https://assets.publishing.service.gov.uk/media/5f05de523a6f40041036a2ec/GMPP_Government_Major_Projects_Portfolio_data_September_2019.csv" + }, + "fields": "GMPP ID, Project Name, Department, 'Project - End Date (Latest Approved End Date)' / 'End Date', 'Departmental narrative on schedule...' / 'Schedule Narrative'" + } + }, + { + "id": "PLH-B12", + "gmppId": "NCA_0001_1415-Q2", + "project": "NCA Transformation Portfolio", + "department": "NCA", + "prevYear": 2021, + "year": 2022, + "prevRelease": "2020-21", + "release": "2021-22", + "prevEnd": "2022-03-31", + "curEnd": "2030-03-31", + "daysMoved": 2922, + "narrative": "Compared to 2021-Q4, your project end-date increased from 31 MAR 2022 to 31 MAR 2030 . This is primarily due to the following factors: The NCA Transformation Portfolio continues to run in line with the Business Case date of 31/03/2030 with an IPA strategic review (Gate 0) and Illicit Finance closure (Gate 5) planned from 4th - 8th April 2022. Our 2022/23 Spending Review Bid has been submitted and we achieved funding of our Data, Digital and Technology Programme. In August 2021 a decision was taken by our Change Committee to move our Portfolio to \"Red\" position due to risks and low confidence in delivery plans and financial forecasts from programmes, pending HMT approval of the IF and Portfolio FY 21/22 Business Cases, lack of clarity on dependencies, delivery performance and benefits. Since then we have introduced more rigour and implemented forums in conjunction with Commercial and Finance to address concerns highlighted above .", + "label": "explained", + "why": "Moved 2,922 days later. The narrative states 'end-date increased from 31 MAR 2022 to 31 MAR 2030'. 'Continues to run in line with the Business Case date of 31/03/2030' matches the new date.", + "inTuningPairsFile": false, + "source": { + "current": { + "release": "IPA Annual Report 2021-22 (data as at 31 Mar 2022)", + "csv": "https://assets.publishing.service.gov.uk/media/62d6c047e90e071e753d6936/GMPP_Government_Major_Projects_Portfolio_AR_Data_March_2022.csv" + }, + "previous": { + "release": "IPA Annual Report 2020-21 (data as at 31 Mar 2021)", + "csv": "https://assets.publishing.service.gov.uk/media/60eecae48fa8f50c7ca55af1/GMPP_Government_Major_Projects_Portofolio_AR_Data_March_2021.csv" + }, + "fields": "GMPP ID, Project Name, Department, 'Project - End Date (Latest Approved End Date)' / 'End Date', 'Departmental narrative on schedule...' / 'Schedule Narrative'" + } + }, + { + "id": "PLH-B13", + "gmppId": "MOJ_0044_1920-Q2", + "project": "Prison Technology Transformation Programme (PTTP)", + "department": "MOJ", + "prevYear": 2021, + "year": 2022, + "prevRelease": "2020-21", + "release": "2021-22", + "prevEnd": "2023-08-31", + "curEnd": "2023-12-31", + "daysMoved": 122, + "narrative": "Compared to 2021-Q4, your project end-date increased from 31 AUG 2023 to 31 DEC 2023 . This is primarily due to the following factors: \r\nThis aligns to the end date for the existing supplier contracts in August 2023, and accounts for programme closure assurance activity following this contract exit delivery. Contract exit remains on schedule for August 2023, aligned to the schedule outlined in the Programme Business Case (PBC).", + "label": "explained", + "why": "Moved 122 days later. The narrative states the increase from 31 Aug 2023 to 31 Dec 2023. 'Contract exit remains on schedule for August 2023' is a different milestone (supplier contract exit), not the end date.", + "doubt": "Names August 2023 (the old end date) for a different milestone. A date-matching checker might pick it up wrongly.", + "inTuningPairsFile": false, + "source": { + "current": { + "release": "IPA Annual Report 2021-22 (data as at 31 Mar 2022)", + "csv": "https://assets.publishing.service.gov.uk/media/62d6c047e90e071e753d6936/GMPP_Government_Major_Projects_Portfolio_AR_Data_March_2022.csv" + }, + "previous": { + "release": "IPA Annual Report 2020-21 (data as at 31 Mar 2021)", + "csv": "https://assets.publishing.service.gov.uk/media/60eecae48fa8f50c7ca55af1/GMPP_Government_Major_Projects_Portofolio_AR_Data_March_2021.csv" + }, + "fields": "GMPP ID, Project Name, Department, 'Project - End Date (Latest Approved End Date)' / 'End Date', 'Departmental narrative on schedule...' / 'Schedule Narrative'" + } + }, + { + "id": "PLH-B14", + "gmppId": "DFT_0034_1920-Q2", + "project": "A12 Chelmsford to A120 Widening", + "department": "DFT", + "prevYear": 2021, + "year": 2022, + "prevRelease": "2020-21", + "release": "2021-22", + "prevEnd": "2028-08-31", + "curEnd": "2028-07-31", + "daysMoved": -31, + "narrative": "Compared to 2021-Q4, your project end-date decreased from 31 AUG 2028 to 31 JUL 2028 . This is primarily due to the following factors: \"The project schedule has an approved baseline position of July 2028 for the project end date and a current forecasted project end date of October 2028. This milestone is not the same as the forecasted date for the road to be open to traffic following the improvements which is December 2027. This is the point at which the post-construction benefits will be begin to be realised. \r\n\r\nWithin the year, the project has seen slippage to interim milestones including DCO application submission as supplementary consultations were required to ensure stakeholders were informed of design amendments.\"", + "label": "explained", + "why": "Moved 31 days earlier. The narrative states 'decreased from 31 AUG 2028 to 31 JUL 2028' and an approved baseline end date of July 2028.", + "doubt": "It also gives a current forecast end date of October 2028 (92 days after the published approved date). The column is 'Latest Approved End Date', which matches the stated approved baseline.", + "prevProject": "A12 Chelmsford to A120 widening", + "inTuningPairsFile": false, + "source": { + "current": { + "release": "IPA Annual Report 2021-22 (data as at 31 Mar 2022)", + "csv": "https://assets.publishing.service.gov.uk/media/62d6c047e90e071e753d6936/GMPP_Government_Major_Projects_Portfolio_AR_Data_March_2022.csv" + }, + "previous": { + "release": "IPA Annual Report 2020-21 (data as at 31 Mar 2021)", + "csv": "https://assets.publishing.service.gov.uk/media/60eecae48fa8f50c7ca55af1/GMPP_Government_Major_Projects_Portofolio_AR_Data_March_2021.csv" + }, + "fields": "GMPP ID, Project Name, Department, 'Project - End Date (Latest Approved End Date)' / 'End Date', 'Departmental narrative on schedule...' / 'Schedule Narrative'" + } + }, + { + "id": "PLH-B15", + "gmppId": "HO_0040_1920-Q4", + "project": "Suspicious Activity Reports (SARS) Reform", + "department": "HO", + "prevYear": 2022, + "year": 2023, + "prevRelease": "2021-22", + "release": "2022-23", + "prevEnd": "2024-04-02", + "curEnd": "2024-07-01", + "daysMoved": 90, + "narrative": "Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 increased from 2024-04-02 to 2024-07-01. This is primarily due to the following factors.\n The programme's delivery of its outcomes and benefits remains on-track. The IT Transformation's Bulk Release successfully went live in March 23; the UK Financial Intelligence Unit (UKFIU) expansion was also successfully delivered in March 23.The remaining SARs IT service delivery went through a re-planning exercise which led to the project end date shifting by 3 months - it is now in the Discovery phase. Alpha and Beta phase(s) are on track.", + "label": "explained", + "why": "Moved 90 days later. The narrative states the increase and that re-planning 'led to the project end date shifting by 3 months'. 'Remains on-track' is about outcomes and benefits.", + "inTuningPairsFile": false, + "source": { + "current": { + "release": "IPA Annual Report 2022-23 (data as at 31 Mar 2023)", + "csv": "https://assets.publishing.service.gov.uk/media/64b79c5171749c001389ee41/GMPP_Government_Major_Projects_Portofolio_AR_Data_March_2023.csv" + }, + "previous": { + "release": "IPA Annual Report 2021-22 (data as at 31 Mar 2022)", + "csv": "https://assets.publishing.service.gov.uk/media/62d6c047e90e071e753d6936/GMPP_Government_Major_Projects_Portfolio_AR_Data_March_2022.csv" + }, + "fields": "GMPP ID, Project Name, Department, 'Project - End Date (Latest Approved End Date)' / 'End Date', 'Departmental narrative on schedule...' / 'Schedule Narrative'" + } + }, + { + "id": "PLH-B16", + "gmppId": "MOJ_0051_2021-Q2", + "project": "PFI Prison Expiry and Transfer Tranche 1", + "department": "MOJ", + "prevYear": 2022, + "year": 2023, + "prevRelease": "2021-22", + "release": "2022-23", + "prevEnd": "2023-09-30", + "curEnd": "2024-01-20", + "daysMoved": 112, + "narrative": "Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 increased from 2023-09-30 to 2024-01-20. This is primarily due to the following factors.\nThe programme schedule has been re-baselined and delivery is on now track.", + "label": "explained", + "why": "Moved 112 days later. The narrative states the increase to 2024-01-20 and that the schedule 'has been re-baselined' before saying delivery is 'on now track'.", + "prevProject": "PFI Prisons Expiry & Transfer Project", + "inTuningPairsFile": false, + "source": { + "current": { + "release": "IPA Annual Report 2022-23 (data as at 31 Mar 2023)", + "csv": "https://assets.publishing.service.gov.uk/media/64b79c5171749c001389ee41/GMPP_Government_Major_Projects_Portofolio_AR_Data_March_2023.csv" + }, + "previous": { + "release": "IPA Annual Report 2021-22 (data as at 31 Mar 2022)", + "csv": "https://assets.publishing.service.gov.uk/media/62d6c047e90e071e753d6936/GMPP_Government_Major_Projects_Portfolio_AR_Data_March_2022.csv" + }, + "fields": "GMPP ID, Project Name, Department, 'Project - End Date (Latest Approved End Date)' / 'End Date', 'Departmental narrative on schedule...' / 'Schedule Narrative'" + } + }, + { + "id": "PLH-B17", + "gmppId": "HO_0041_2021-Q3", + "project": "Police Uplift Programme", + "department": "HO", + "prevYear": 2022, + "year": 2023, + "prevRelease": "2021-22", + "release": "2022-23", + "prevEnd": "2024-03-31", + "curEnd": "2023-09-30", + "daysMoved": -183, + "narrative": "Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 decreased from 2024-03-31 to 2023-09-30. This is primarily due to the following factors.\n Policing has recruited the additional officers, as scheduled. The programme is continuing preparations for closure, as planned, by the end of Quarter 2 23/24.", + "label": "explained", + "why": "Moved 183 days earlier. The narrative states 'decreased from 2024-03-31 to 2023-09-30'. 'As scheduled' and 'as planned' refer to recruitment and closure.", + "inTuningPairsFile": false, + "source": { + "current": { + "release": "IPA Annual Report 2022-23 (data as at 31 Mar 2023)", + "csv": "https://assets.publishing.service.gov.uk/media/64b79c5171749c001389ee41/GMPP_Government_Major_Projects_Portofolio_AR_Data_March_2023.csv" + }, + "previous": { + "release": "IPA Annual Report 2021-22 (data as at 31 Mar 2022)", + "csv": "https://assets.publishing.service.gov.uk/media/62d6c047e90e071e753d6936/GMPP_Government_Major_Projects_Portfolio_AR_Data_March_2022.csv" + }, + "fields": "GMPP ID, Project Name, Department, 'Project - End Date (Latest Approved End Date)' / 'End Date', 'Departmental narrative on schedule...' / 'Schedule Narrative'" + } + }, + { + "id": "PLH-B18", + "gmppId": "FCO_0011_1718-Q3", + "project": "Washington Embassy Refurbishment", + "department": "FCDO", + "prevYear": 2023, + "year": 2024, + "prevRelease": "2022-23", + "release": "2023-24", + "prevEnd": "2023-08-01", + "curEnd": "2024-09-30", + "daysMoved": 426, + "narrative": "The project's end-date at 23/24-Q4 is 2024-09-30. This is primarily due to the following factors. \n\n Original programme set pre-Covid and revised to take account of subsequent delays/supply chain issues", + "label": "explained", + "why": "Moved 426 days later. No 'increased from' template sentence. The narrative gives the new date (2024-09-30) and says the programme was 'revised to take account of subsequent delays/supply chain issues'.", + "doubt": "States the change only in paraphrase ('revised... delays'), with no old date.", + "inTuningPairsFile": false, + "source": { + "current": { + "release": "IPA Annual Report 2023-24 (data as at 31 Mar 2024)", + "csv": "https://assets.publishing.service.gov.uk/media/6787e8ee1124a2c3ceb646be/Government_Major_Projects_Portofolio_AR_Data_March_2024.csv" + }, + "previous": { + "release": "IPA Annual Report 2022-23 (data as at 31 Mar 2023)", + "csv": "https://assets.publishing.service.gov.uk/media/64b79c5171749c001389ee41/GMPP_Government_Major_Projects_Portofolio_AR_Data_March_2023.csv" + }, + "fields": "GMPP ID, Project Name, Department, 'Project - End Date (Latest Approved End Date)' / 'End Date', 'Departmental narrative on schedule...' / 'Schedule Narrative'" + } + }, + { + "id": "PLH-B19", + "gmppId": "HMRC_0033_2122-Q3", + "project": "Unique Customer Record", + "department": "HMRC", + "prevYear": 2023, + "year": 2024, + "prevRelease": "2022-23", + "release": "2023-24", + "prevEnd": "2024-05-07", + "curEnd": "2025-03-31", + "daysMoved": 328, + "narrative": "Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 increased from 2024-05-07 to 2025-03-31. This is primarily due to the following factors. \n\n The programme is now more mature in its lifecycle and has more accurate plans. This is reflected in the current programme end date which the programme remains on track to meet.", + "label": "explained", + "why": "Moved 328 days later. The narrative states 'increased from 2024-05-07 to 2025-03-31'. 'Remains on track to meet' refers to the current (new) end date.", + "inTuningPairsFile": false, + "source": { + "current": { + "release": "IPA Annual Report 2023-24 (data as at 31 Mar 2024)", + "csv": "https://assets.publishing.service.gov.uk/media/6787e8ee1124a2c3ceb646be/Government_Major_Projects_Portofolio_AR_Data_March_2024.csv" + }, + "previous": { + "release": "IPA Annual Report 2022-23 (data as at 31 Mar 2023)", + "csv": "https://assets.publishing.service.gov.uk/media/64b79c5171749c001389ee41/GMPP_Government_Major_Projects_Portofolio_AR_Data_March_2023.csv" + }, + "fields": "GMPP ID, Project Name, Department, 'Project - End Date (Latest Approved End Date)' / 'End Date', 'Departmental narrative on schedule...' / 'Schedule Narrative'" + } + }, + { + "id": "PLH-B20", + "gmppId": "HO_0044_2021-Q4", + "project": "Passport Transformation Programme", + "department": "HO", + "prevYear": 2023, + "year": 2024, + "prevRelease": "2022-23", + "release": "2023-24", + "prevEnd": "2023-03-31", + "curEnd": "2025-04-30", + "daysMoved": 761, + "narrative": "The project's end-date at 23/24-Q4 is 2025-04-30. This is primarily due to the following factors. \n\n Compared to 2023 Q4, Passport Transformation Programme has increased forecasted end date from 31 March 2025 to 30 April 2025. This is primarily due to the inclusion of the Priority Service capability within the scope of the programme.", + "label": "explained", + "why": "Moved 761 days later. The narrative gives the new date (2025-04-30) and says the programme 'has increased forecasted end date from 31 March 2025 to 30 April 2025' because of added scope.", + "doubt": "The 'from' date it states (31 Mar 2025) is not the published previous date (31 Mar 2023), but the move and the new date match the column.", + "prevProject": "HMPO Transformation", + "inTuningPairsFile": false, + "source": { + "current": { + "release": "IPA Annual Report 2023-24 (data as at 31 Mar 2024)", + "csv": "https://assets.publishing.service.gov.uk/media/6787e8ee1124a2c3ceb646be/Government_Major_Projects_Portofolio_AR_Data_March_2024.csv" + }, + "previous": { + "release": "IPA Annual Report 2022-23 (data as at 31 Mar 2023)", + "csv": "https://assets.publishing.service.gov.uk/media/64b79c5171749c001389ee41/GMPP_Government_Major_Projects_Portofolio_AR_Data_March_2023.csv" + }, + "fields": "GMPP ID, Project Name, Department, 'Project - End Date (Latest Approved End Date)' / 'End Date', 'Departmental narrative on schedule...' / 'Schedule Narrative'" + } + }, + { + "id": "PLH-B21", + "gmppId": "CO_0014_2122-Q2", + "project": "National Underground Asset Register (NUAR)", + "department": "DSIT", + "prevYear": 2024, + "year": 2025, + "prevRelease": "2023-24", + "release": "2024-25", + "prevEnd": "2024-09-30", + "curEnd": "2026-03-31", + "daysMoved": 547, + "narrative": "Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2025 to 31/03/2026. This is primarily due to the following factors‚\nThe programme competed the development of the NUAR service and transitioned it to the appointed long-term operator by 31/03/25, within the approved schedule. Commitments to move to Public Beta by spring 2025, and to be fully operational by the end of 2025 remain on schedule.\n\nThe programme has received approval to extend by an additional 12 months to oversee the delivery of Public Beta and Fully Operational commitments, the progression of legislative measures, and to explore, through extensive stakeholder engagement and robust testing, if and how additional benefits could be delivered by increasing access to NUAR data.\n\nThis funding extension has, in part, been necessitated by fall of the Data Protection and Digital Identity Bill after the general election was called in May 2024. This meant a new Bill was required to pass the NUAR measures through parliament, extending timelines, which is required to full operationalise the service and fully realise the envisaged benefits.", + "label": "explained", + "why": "Moved 547 days later. The narrative states 'increased from 31/03/2025 to 31/03/2026' and that the programme 'has received approval to extend by an additional 12 months'. 'Remain on schedule' refers to Public Beta commitments.", + "doubt": "The 'from' date (31/03/2025) differs from the published previous date (30/09/2024); the new date matches.", + "prevProject": "National Underground Asset Register", + "inTuningPairsFile": false, + "source": { + "current": { + "release": "NISTA Annual Report 2024-25 (data as at 31 Mar 2025)", + "csv": "https://assets.publishing.service.gov.uk/media/6895fbb63080e72710b2e2ef/nista_annual_report_data_2425.csv" + }, + "previous": { + "release": "IPA Annual Report 2023-24 (data as at 31 Mar 2024)", + "csv": "https://assets.publishing.service.gov.uk/media/6787e8ee1124a2c3ceb646be/Government_Major_Projects_Portofolio_AR_Data_March_2024.csv" + }, + "fields": "GMPP ID, Project Name, Department, 'Project - End Date (Latest Approved End Date)' / 'End Date', 'Departmental narrative on schedule...' / 'Schedule Narrative'" + } + }, + { + "id": "PLH-B22", + "gmppId": "HMRC_0291_2324-Q3", + "project": "VOA Business Systems Transformation (BST) Council Tax", + "department": "VOA", + "prevYear": 2024, + "year": 2025, + "prevRelease": "2023-24", + "release": "2024-25", + "prevEnd": "2026-03-31", + "curEnd": "2025-06-30", + "daysMoved": -274, + "narrative": "Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 decreased from 31/03/2026 to 30/06/2025. This is primarily due to the following factors‚\nThe programme delivery schedule reduced from March 2026 to June 2025, to reflect the removal of Non-Domestic Rates deliverables. A new programme has been established which is now accountable for the scope that was removed from BST. ", + "label": "explained", + "why": "Moved 274 days earlier. The narrative states 'decreased from 31/03/2026 to 30/06/2025' because scope was removed.", + "prevProject": "VOA Business Systems Transformation", + "inTuningPairsFile": false, + "source": { + "current": { + "release": "NISTA Annual Report 2024-25 (data as at 31 Mar 2025)", + "csv": "https://assets.publishing.service.gov.uk/media/6895fbb63080e72710b2e2ef/nista_annual_report_data_2425.csv" + }, + "previous": { + "release": "IPA Annual Report 2023-24 (data as at 31 Mar 2024)", + "csv": "https://assets.publishing.service.gov.uk/media/6787e8ee1124a2c3ceb646be/Government_Major_Projects_Portofolio_AR_Data_March_2024.csv" + }, + "fields": "GMPP ID, Project Name, Department, 'Project - End Date (Latest Approved End Date)' / 'End Date', 'Departmental narrative on schedule...' / 'Schedule Narrative'" + } + }, + { + "id": "PLH-B23", + "gmppId": "DFE_0006_1415-Q3", + "project": "Priority School Building Programme 2", + "department": "DFE", + "prevYear": 2020, + "year": 2021, + "prevRelease": "2019-20", + "release": "2020-21", + "prevEnd": "2025-02-25", + "curEnd": "2025-02-25", + "daysMoved": 0, + "narrative": "Compared to financial year 19/20-Q2, the project's end-date remained scheduled to finish on 25 February 2025 . This is primarily due to the following factors: The programme scheduled end date remains unchanged.", + "label": "no-move", + "why": "Published end date unchanged (25 Feb 2025). The narrative also says it is unchanged.", + "inTuningPairsFile": false, + "source": { + "current": { + "release": "IPA Annual Report 2020-21 (data as at 31 Mar 2021)", + "csv": "https://assets.publishing.service.gov.uk/media/60eecae48fa8f50c7ca55af1/GMPP_Government_Major_Projects_Portofolio_AR_Data_March_2021.csv" + }, + "previous": { + "release": "IPA Annual Report 2019-20 (data as at 30 Sep 2019)", + "csv": "https://assets.publishing.service.gov.uk/media/5f05de523a6f40041036a2ec/GMPP_Government_Major_Projects_Portfolio_data_September_2019.csv" + }, + "fields": "GMPP ID, Project Name, Department, 'Project - End Date (Latest Approved End Date)' / 'End Date', 'Departmental narrative on schedule...' / 'Schedule Narrative'" + } + }, + { + "id": "PLH-B24", + "gmppId": "DFID_0001_1112-Q1", + "project": "St Helena Airport", + "department": "FCDO", + "prevYear": 2020, + "year": 2021, + "prevRelease": "2019-20", + "release": "2020-21", + "prevEnd": "2026-08-31", + "curEnd": "2026-08-31", + "daysMoved": 0, + "narrative": "Compared to financial year 19/20-Q2, the project's end-date remained scheduled to finish on 31 August 2026 . This is primarily due to the following factors: The scheduled baseline project end date remains 31/08/26, has not changed since last year. The construction of the airport was completed on schedule with the airport receiving certification during May 2016. St Helena's commercial air service made a strong start since commencing on 14 October 2017. - The department hopes to close the project when firm plans are in place for the completion of outstanding infrastructure works. The following non-project operating environment activities have impacted the project: The COVID 19 pandemic has delayed the Department progressing the workstream that will find the most cost-effective way to bring outstanding capital works to completion. The Department has focused its efforts to ensuring St Helena Government has the resources it needs to respond to COVID 19. We return to this issue as soon as we have resources to do so.", + "label": "no-move", + "why": "Published end date unchanged (31 Aug 2026). The narrative says 'has not changed since last year'.", + "inTuningPairsFile": false, + "source": { + "current": { + "release": "IPA Annual Report 2020-21 (data as at 31 Mar 2021)", + "csv": "https://assets.publishing.service.gov.uk/media/60eecae48fa8f50c7ca55af1/GMPP_Government_Major_Projects_Portofolio_AR_Data_March_2021.csv" + }, + "previous": { + "release": "IPA Annual Report 2019-20 (data as at 30 Sep 2019)", + "csv": "https://assets.publishing.service.gov.uk/media/5f05de523a6f40041036a2ec/GMPP_Government_Major_Projects_Portfolio_data_September_2019.csv" + }, + "fields": "GMPP ID, Project Name, Department, 'Project - End Date (Latest Approved End Date)' / 'End Date', 'Departmental narrative on schedule...' / 'Schedule Narrative'" + } + }, + { + "id": "PLH-B25", + "gmppId": "MOJ_0028_1314-Q2", + "project": "HMCTS Reform", + "department": "MOJ", + "prevYear": 2020, + "year": 2021, + "prevRelease": "2019-20", + "release": "2020-21", + "prevEnd": "2023-12-31", + "curEnd": "2023-12-31", + "daysMoved": 0, + "narrative": "Compared to financial year 19/20-Q2, the project's end-date increased from 31 March 2020 to 31 December 2023 . This is primarily due to the following factors: There has been no change to the projected end date.", + "label": "no-move", + "why": "Published end date unchanged (31 Dec 2023 in both releases). The template sentence claims 'increased from 31 March 2020 to 31 December 2023', then says 'There has been no change to the projected end date'.", + "doubt": "False-positive test: the narrative states a move that the published dates do not show.", + "inTuningPairsFile": false, + "source": { + "current": { + "release": "IPA Annual Report 2020-21 (data as at 31 Mar 2021)", + "csv": "https://assets.publishing.service.gov.uk/media/60eecae48fa8f50c7ca55af1/GMPP_Government_Major_Projects_Portofolio_AR_Data_March_2021.csv" + }, + "previous": { + "release": "IPA Annual Report 2019-20 (data as at 30 Sep 2019)", + "csv": "https://assets.publishing.service.gov.uk/media/5f05de523a6f40041036a2ec/GMPP_Government_Major_Projects_Portfolio_data_September_2019.csv" + }, + "fields": "GMPP ID, Project Name, Department, 'Project - End Date (Latest Approved End Date)' / 'End Date', 'Departmental narrative on schedule...' / 'Schedule Narrative'" + } + }, + { + "id": "PLH-B26", + "gmppId": "FCO_0012_1718-Q4", + "project": "Hera Programme", + "department": "FCDO", + "prevYear": 2021, + "year": 2022, + "prevRelease": "2020-21", + "release": "2021-22", + "prevEnd": "2022-10-31", + "curEnd": "2022-10-31", + "daysMoved": 0, + "narrative": "Compared to 2021-Q4, your project end-date remained scheduled to finish on 31 OCT 2022 . This is primarily due to the following factors: The scheduled end date for the Hera programme has been extended until January 2023; this follows issues which emerged in the planned late Autumn release of Hera which resulted in a re-planning exercise. The programme has updated its release schedule accordingly, and is currently on track against its baselined plans for delivering the a phased implementation in the summer and late Autumn 2022.", + "label": "no-move", + "why": "Published end date unchanged (31 Oct 2022). The narrative says it 'remained scheduled to finish on 31 OCT 2022', then that the end date 'has been extended until January 2023'.", + "doubt": "The narrative contradicts itself and claims a move the column does not show. No finish movement, so not a contradiction under ProjectLens's rule.", + "inTuningPairsFile": false, + "source": { + "current": { + "release": "IPA Annual Report 2021-22 (data as at 31 Mar 2022)", + "csv": "https://assets.publishing.service.gov.uk/media/62d6c047e90e071e753d6936/GMPP_Government_Major_Projects_Portfolio_AR_Data_March_2022.csv" + }, + "previous": { + "release": "IPA Annual Report 2020-21 (data as at 31 Mar 2021)", + "csv": "https://assets.publishing.service.gov.uk/media/60eecae48fa8f50c7ca55af1/GMPP_Government_Major_Projects_Portofolio_AR_Data_March_2021.csv" + }, + "fields": "GMPP ID, Project Name, Department, 'Project - End Date (Latest Approved End Date)' / 'End Date', 'Departmental narrative on schedule...' / 'Schedule Narrative'" + } + }, + { + "id": "PLH-B27", + "gmppId": "HO_0029_1314-Q4", + "project": "Immigration Platform Technologies (IPT)", + "department": "HO", + "prevYear": 2021, + "year": 2022, + "prevRelease": "2020-21", + "release": "2021-22", + "prevEnd": "2021-10-29", + "curEnd": "2021-10-29", + "daysMoved": 0, + "narrative": "Compared to 2021-Q4, your project end-date remained scheduled to finish on 29 OCT 2021 . This is primarily due to the following factors: The Programme end date has been delayed primarily due to challenges faced in: delivering the Data and Management Information elements of the programme, which were underestimated; the new work relating to Afghan resettlement; British National Overseas changes (specifically for Hong Kong); and the need for changes to allow for refugees from the Ukraine to be granted visas using Atlas. These new priorities and emerging demand have resulted in additional scope to the wider Immigration Portfolio, which has in turn impacted IPT, placing additional demands on the programme team, delaying testing activity across a range of services and slowing down the roll-out activity. \nThe programme plan has been reviewed and revised, resulting in a longer delivery timeframe.", + "label": "no-move", + "why": "Published end date unchanged (29 Oct 2021, already in the past). The narrative says 'The Programme end date has been delayed' and the plan was revised.", + "doubt": "As above: the narrative claims a delay that the column does not show.", + "inTuningPairsFile": false, + "source": { + "current": { + "release": "IPA Annual Report 2021-22 (data as at 31 Mar 2022)", + "csv": "https://assets.publishing.service.gov.uk/media/62d6c047e90e071e753d6936/GMPP_Government_Major_Projects_Portfolio_AR_Data_March_2022.csv" + }, + "previous": { + "release": "IPA Annual Report 2020-21 (data as at 31 Mar 2021)", + "csv": "https://assets.publishing.service.gov.uk/media/60eecae48fa8f50c7ca55af1/GMPP_Government_Major_Projects_Portofolio_AR_Data_March_2021.csv" + }, + "fields": "GMPP ID, Project Name, Department, 'Project - End Date (Latest Approved End Date)' / 'End Date', 'Departmental narrative on schedule...' / 'Schedule Narrative'" + } + }, + { + "id": "PLH-B28", + "gmppId": "DEFRA_0010_2021-Q3", + "project": "Leeds Phase 2 Flood Scheme", + "department": "DEFRA", + "prevYear": 2022, + "year": 2023, + "prevRelease": "2021-22", + "release": "2022-23", + "prevEnd": "2024-10-18", + "curEnd": "2024-10-18", + "daysMoved": 0, + "narrative": "Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2024-10-18. This is primarily due to the following factors.\n Unforeseen delays have been experienced when finding a temporary works solution for a listed structure and whilst mitigation measures have been implemented, the project completion date has changed by 15 weeks. The overall design and construction works are approximately 85% through the programme.", + "label": "no-move", + "why": "Published end date unchanged (18 Oct 2024). The narrative says it remained on that date but that 'the project completion date has changed by 15 weeks'.", + "doubt": "As above: the narrative states a change that the column does not show.", + "inTuningPairsFile": false, + "source": { + "current": { + "release": "IPA Annual Report 2022-23 (data as at 31 Mar 2023)", + "csv": "https://assets.publishing.service.gov.uk/media/64b79c5171749c001389ee41/GMPP_Government_Major_Projects_Portofolio_AR_Data_March_2023.csv" + }, + "previous": { + "release": "IPA Annual Report 2021-22 (data as at 31 Mar 2022)", + "csv": "https://assets.publishing.service.gov.uk/media/62d6c047e90e071e753d6936/GMPP_Government_Major_Projects_Portfolio_AR_Data_March_2022.csv" + }, + "fields": "GMPP ID, Project Name, Department, 'Project - End Date (Latest Approved End Date)' / 'End Date', 'Departmental narrative on schedule...' / 'Schedule Narrative'" + } + }, + { + "id": "PLH-B29", + "gmppId": "DCMS_0008_1516-Q4", + "project": "Blythe House Programme", + "department": "DCMS", + "prevYear": 2023, + "year": 2024, + "prevRelease": "2022-23", + "release": "2023-24", + "prevEnd": "2024-06-28", + "curEnd": "2024-06-28", + "daysMoved": 0, + "narrative": "The project's end-date at 23/24-Q4 is 2024-06-28. This is primarily due to the following factors. \n\n The change in end date is due to adding contingency to the V&A's decant schedule to ensure vacation of Blythe House in time for sale completion.", + "label": "no-move", + "why": "Published end date unchanged (28 Jun 2024). The narrative says 'The change in end date is due to adding contingency...'. That change happened in the previous release (31 Mar 2023 -> 28 Jun 2024).", + "doubt": "The narrative explains a move from the previous year.", + "inTuningPairsFile": false, + "source": { + "current": { + "release": "IPA Annual Report 2023-24 (data as at 31 Mar 2024)", + "csv": "https://assets.publishing.service.gov.uk/media/6787e8ee1124a2c3ceb646be/Government_Major_Projects_Portofolio_AR_Data_March_2024.csv" + }, + "previous": { + "release": "IPA Annual Report 2022-23 (data as at 31 Mar 2023)", + "csv": "https://assets.publishing.service.gov.uk/media/64b79c5171749c001389ee41/GMPP_Government_Major_Projects_Portofolio_AR_Data_March_2023.csv" + }, + "fields": "GMPP ID, Project Name, Department, 'Project - End Date (Latest Approved End Date)' / 'End Date', 'Departmental narrative on schedule...' / 'Schedule Narrative'" + } + }, + { + "id": "PLH-B30", + "gmppId": "CO_0035_2122-Q1", + "project": "Single Trade Window Programme", + "department": "HMRC", + "prevYear": 2023, + "year": 2024, + "prevRelease": "2022-23", + "release": "2023-24", + "prevEnd": "2027-03-31", + "curEnd": "2027-03-31", + "daysMoved": 0, + "narrative": "Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2027-03-31. This is primarily due to the following factors. \n\n The STW programme is on track to complete by the end date of 31 March 2027", + "label": "no-move", + "why": "Published end date unchanged (31 Mar 2027). The narrative says it remained and 'is on track to complete by the end date of 31 March 2027'.", + "inTuningPairsFile": false, + "source": { + "current": { + "release": "IPA Annual Report 2023-24 (data as at 31 Mar 2024)", + "csv": "https://assets.publishing.service.gov.uk/media/6787e8ee1124a2c3ceb646be/Government_Major_Projects_Portofolio_AR_Data_March_2024.csv" + }, + "previous": { + "release": "IPA Annual Report 2022-23 (data as at 31 Mar 2023)", + "csv": "https://assets.publishing.service.gov.uk/media/64b79c5171749c001389ee41/GMPP_Government_Major_Projects_Portofolio_AR_Data_March_2023.csv" + }, + "fields": "GMPP ID, Project Name, Department, 'Project - End Date (Latest Approved End Date)' / 'End Date', 'Departmental narrative on schedule...' / 'Schedule Narrative'" + } + }, + { + "id": "PLH-B31", + "gmppId": "MOD_0138_2122-Q1", + "project": "SEA VENOM", + "department": "MoD", + "prevYear": 2024, + "year": 2025, + "prevRelease": "2023-24", + "release": "2024-25", + "prevEnd": "2029-12-21", + "curEnd": "2029-12-21", + "daysMoved": 0, + "narrative": "Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 21/12/2029. This is primarily due to the following factors.\nThe programme end date has been maintained.", + "label": "no-move", + "why": "Published end date unchanged (21 Dec 2029). The narrative says 'remained at 21/12/2029' and that the end date 'has been maintained'.", + "prevProject": "Sea Venom", + "inTuningPairsFile": false, + "source": { + "current": { + "release": "NISTA Annual Report 2024-25 (data as at 31 Mar 2025)", + "csv": "https://assets.publishing.service.gov.uk/media/6895fbb63080e72710b2e2ef/nista_annual_report_data_2425.csv" + }, + "previous": { + "release": "IPA Annual Report 2023-24 (data as at 31 Mar 2024)", + "csv": "https://assets.publishing.service.gov.uk/media/6787e8ee1124a2c3ceb646be/Government_Major_Projects_Portofolio_AR_Data_March_2024.csv" + }, + "fields": "GMPP ID, Project Name, Department, 'Project - End Date (Latest Approved End Date)' / 'End Date', 'Departmental narrative on schedule...' / 'Schedule Narrative'" + } + }, + { + "id": "PLH-B32", + "gmppId": "HO_0229_2223-Q4", + "project": "Fraud Reform", + "department": "HO", + "prevYear": 2024, + "year": 2025, + "prevRelease": "2023-24", + "release": "2024-25", + "prevEnd": "2025-03-31", + "curEnd": "2025-03-31", + "daysMoved": 0, + "narrative": "Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2025. This is primarily due to the following factors‚\nThe programme formally closed on 31/03/2025.", + "label": "no-move", + "why": "Published end date unchanged (31 Mar 2025). The narrative says it remained and the programme 'formally closed on 31/03/2025'.", + "inTuningPairsFile": false, + "source": { + "current": { + "release": "NISTA Annual Report 2024-25 (data as at 31 Mar 2025)", + "csv": "https://assets.publishing.service.gov.uk/media/6895fbb63080e72710b2e2ef/nista_annual_report_data_2425.csv" + }, + "previous": { + "release": "IPA Annual Report 2023-24 (data as at 31 Mar 2024)", + "csv": "https://assets.publishing.service.gov.uk/media/6787e8ee1124a2c3ceb646be/Government_Major_Projects_Portofolio_AR_Data_March_2024.csv" + }, + "fields": "GMPP ID, Project Name, Department, 'Project - End Date (Latest Approved End Date)' / 'End Date', 'Departmental narrative on schedule...' / 'Schedule Narrative'" + } + } + ] +} \ No newline at end of file diff --git a/bench/real-cases/projectlens-heldout2.json b/bench/real-cases/projectlens-heldout2.json new file mode 100644 index 0000000..dd25950 --- /dev/null +++ b/bench/real-cases/projectlens-heldout2.json @@ -0,0 +1,1182 @@ +{ + "meta": { + "description": "Second held-out GMPP set for ProjectLens (2016-17 -> 2017-18, 2017-18 -> 2018-19, 2018-19 -> 2019-20). Not for tuning.", + "yearConvention": "year N = the release labelled (N-1)-N; these releases report data as at 30 September of year N-1.", + "labelRules": { + "contradiction": "end date moved >14 days and the narrative says unchanged/the same/on track or on schedule, or names a current end date >14 days from the published one, without stating the actual move", + "explained": "end date moved >14 days and the narrative states the change (or the delay that caused it)", + "no-move": "published end date identical in both releases (daysMoved = 0)" + }, + "contradictionTypes": { + "claims-unchanged": "narrative says unchanged / remained / stable", + "claims-on-track": "narrative presents stability as 'on track' / 'on schedule' / 'on time' with no move stated (tuning treated these paraphrases as stability claims)", + "names-different-date": "narrative names a current end date >14 days from the published one" + }, + "matching": "These releases publish no stable GMPP ID before 2019-20. Pairs are joined on the exact project name after lower-casing and stripping punctuation, and only when the name is unique in both releases. Departments match (allowing renames, e.g. DH -> DHSC).", + "narrativeVerbatim": "Exact cell text from the current-release CSV (Windows-1252 decoded), including line breaks.", + "licence": "Contains public sector information licensed under the Open Government Licence v3.0." + }, + "cases": [ + { + "id": "PLH2-B01", + "gmppId": "BIS_0014_1415-Q3", + "gmppIdSource": "from the 2019-20 release, same project name", + "project": "New Polar Research Vessel", + "department": "BEIS", + "prevYear": 2017, + "year": 2018, + "prevRelease": "2016-17", + "release": "2017-18", + "prevEnd": "2020-07-01", + "curEnd": "2022-12-31", + "prevEndAsPublished": "01/07/2020", + "curEndAsPublished": "31/12/22", + "daysMoved": 913, + "narrative": "Programme is on track to deliver to its agreed schedule.", + "label": "contradiction", + "why": "End date moved 913 days later (1 Jul 2020 -> 31 Dec 2022). The whole narrative is 'Programme is on track to deliver to its agreed schedule.' It states no move.", + "contradictionType": "claims-on-track", + "matchedBy": "exact project name (case and punctuation normalised), unique in both releases", + "source": { + "current": { + "release": "IPA Annual Report 2017-18 (data as at 30 Sep 2017)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2018", + "csv": "https://assets.publishing.service.gov.uk/media/5b3e2e2340f0b678bc5d018c/csv-ipa-government-major-projects-portfolio-data-september-2017.csv" + }, + "previous": { + "release": "IPA Annual Report 2016-17 (data as at 30 Sep 2016)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2017", + "csv": "https://assets.publishing.service.gov.uk/media/5a821ed6e5274a2e8ab57995/Annual_Report_-_consolidated_data_and_narratives.csv" + } + } + }, + { + "id": "PLH2-B02", + "gmppId": null, + "gmppIdSource": null, + "project": "Automatic Enrolment Programme", + "department": "DWP", + "prevYear": 2017, + "year": 2018, + "prevRelease": "2016-17", + "release": "2017-18", + "prevEnd": "2018-11-30", + "curEnd": "2019-11-30", + "prevEndAsPublished": "30/11/2018", + "curEndAsPublished": "30/11/19", + "daysMoved": 365, + "narrative": "The Programme went live on time. The implementation approach has been designed to accommodate the significant increase in volumes over the 2015-2018 period, the Programme is on track to deliver this to timetable.", + "label": "contradiction", + "why": "End date moved 365 days later (30 Nov 2018 -> 30 Nov 2019). The narrative says the programme 'went live on time' and 'is on track to deliver this to timetable'. It states no move.", + "contradictionType": "claims-on-track", + "matchedBy": "exact project name (case and punctuation normalised), unique in both releases", + "source": { + "current": { + "release": "IPA Annual Report 2017-18 (data as at 30 Sep 2017)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2018", + "csv": "https://assets.publishing.service.gov.uk/media/5b3e2e2340f0b678bc5d018c/csv-ipa-government-major-projects-portfolio-data-september-2017.csv" + }, + "previous": { + "release": "IPA Annual Report 2016-17 (data as at 30 Sep 2016)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2017", + "csv": "https://assets.publishing.service.gov.uk/media/5a821ed6e5274a2e8ab57995/Annual_Report_-_consolidated_data_and_narratives.csv" + } + } + }, + { + "id": "PLH2-B03", + "gmppId": "MOD_0105_1617-Q1", + "gmppIdSource": "from the 2019-20 release, same project name", + "project": "Land Environment Tactical Communication and Information Systems", + "department": "MOD", + "prevYear": 2017, + "year": 2018, + "prevRelease": "2016-17", + "release": "2017-18", + "prevEnd": "2035-12-01", + "curEnd": "2035-12-31", + "prevEndAsPublished": "01/12/2035", + "curEndAsPublished": "31/12/35", + "daysMoved": 30, + "narrative": "The programme has refined its long-term design this year and split into 2 tranches - the first to undertake technical and business transformation to enable open architecture and open competition - effectively achieve a baseline for future evolution - and the second tranche to spirally evolve capability over time. The programme is on schedule as planned.", + "label": "contradiction", + "why": "End date moved 30 days later (1 Dec 2035 -> 31 Dec 2035). The narrative ends 'The programme is on schedule as planned.' It describes a redesign into two tranches but states no date change.", + "contradictionType": "claims-on-track", + "doubt": "A small move. The tranche redesign could be read as context for it.", + "prevDepartment": "MoD", + "matchedBy": "exact project name (case and punctuation normalised), unique in both releases", + "source": { + "current": { + "release": "IPA Annual Report 2017-18 (data as at 30 Sep 2017)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2018", + "csv": "https://assets.publishing.service.gov.uk/media/5b3e2e2340f0b678bc5d018c/csv-ipa-government-major-projects-portfolio-data-september-2017.csv" + }, + "previous": { + "release": "IPA Annual Report 2016-17 (data as at 30 Sep 2016)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2017", + "csv": "https://assets.publishing.service.gov.uk/media/5a821ed6e5274a2e8ab57995/Annual_Report_-_consolidated_data_and_narratives.csv" + } + } + }, + { + "id": "PLH2-B04", + "gmppId": "MOD_0078_1213-Q1", + "gmppIdSource": "from the 2019-20 release, same project name", + "project": "Core Production Capability", + "department": "MOD", + "prevYear": 2017, + "year": 2018, + "prevRelease": "2016-17", + "release": "2017-18", + "prevEnd": "2028-05-15", + "curEnd": "2028-04-30", + "prevEndAsPublished": "15/05/2028", + "curEndAsPublished": "30/04/28", + "daysMoved": -15, + "narrative": "The CPC schedule has remained stable throughout 2017. Delivery of cores to the Refuel and Submarine Build programmes remains on track to meet Required in Yard Dates. \r", + "label": "contradiction", + "why": "End date moved 15 days earlier (15 May 2028 -> 30 Apr 2028). The narrative says 'The CPC schedule has remained stable throughout 2017.'", + "contradictionType": "claims-unchanged", + "doubt": "A 15-day move, one day over the 14-day threshold. This tests the boundary; a 14-day tolerance on the move itself would make it no-move.", + "prevDepartment": "MoD", + "matchedBy": "exact project name (case and punctuation normalised), unique in both releases", + "source": { + "current": { + "release": "IPA Annual Report 2017-18 (data as at 30 Sep 2017)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2018", + "csv": "https://assets.publishing.service.gov.uk/media/5b3e2e2340f0b678bc5d018c/csv-ipa-government-major-projects-portfolio-data-september-2017.csv" + }, + "previous": { + "release": "IPA Annual Report 2016-17 (data as at 30 Sep 2016)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2017", + "csv": "https://assets.publishing.service.gov.uk/media/5a821ed6e5274a2e8ab57995/Annual_Report_-_consolidated_data_and_narratives.csv" + } + } + }, + { + "id": "PLH2-B05", + "gmppId": "DH_0041_1314-Q2", + "gmppIdSource": "from the 2019-20 release, same project name", + "project": "Health & Social Care Network", + "department": "DHSC", + "prevYear": 2017, + "year": 2018, + "prevRelease": "2016-17", + "release": "2017-18", + "prevEnd": "2020-04-01", + "curEnd": "2021-03-31", + "prevEndAsPublished": "01/04/2020", + "curEndAsPublished": "31/03/21", + "daysMoved": 364, + "narrative": "The HSCN programme remains on track to complete the remaining major objectives of completing the migration of circa 14,000 customers from legacy infrastructure to HSCN by August 2020, and making 35% savings on the cost of access connectivity, although it is recognised that due to the highly distributed and locally owned nature of the migration there are significant risks that are being carefully managed by the programme team. ", + "label": "contradiction", + "why": "End date moved 364 days later (1 Apr 2020 -> 31 Mar 2021). The narrative says the programme 'remains on track to complete the remaining major objectives ... by August 2020'. It states no move, and August 2020 is more than 14 days from the published 31 Mar 2021.", + "contradictionType": "claims-on-track", + "doubt": "August 2020 is the migration objective, not explicitly the end date.", + "prevDepartment": "DH", + "matchedBy": "exact project name (case and punctuation normalised), unique in both releases", + "source": { + "current": { + "release": "IPA Annual Report 2017-18 (data as at 30 Sep 2017)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2018", + "csv": "https://assets.publishing.service.gov.uk/media/5b3e2e2340f0b678bc5d018c/csv-ipa-government-major-projects-portfolio-data-september-2017.csv" + }, + "previous": { + "release": "IPA Annual Report 2016-17 (data as at 30 Sep 2016)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2017", + "csv": "https://assets.publishing.service.gov.uk/media/5a821ed6e5274a2e8ab57995/Annual_Report_-_consolidated_data_and_narratives.csv" + } + } + }, + { + "id": "PLH2-B06", + "gmppId": "CO_0019_1617-Q4", + "gmppIdSource": "from the 2019-20 release, same project name", + "project": "Government as a Platform", + "department": "CO", + "prevYear": 2018, + "year": 2019, + "prevRelease": "2017-18", + "release": "2018-19", + "prevEnd": "2021-03-31", + "curEnd": "2020-03-31", + "prevEndAsPublished": "31/03/21", + "curEndAsPublished": "31/03/2020", + "daysMoved": -365, + "narrative": "The project remains on track to complete to the current schedule ", + "label": "contradiction", + "why": "End date moved 365 days earlier (31 Mar 2021 -> 31 Mar 2020). The whole narrative is 'The project remains on track to complete to the current schedule'. It states no move.", + "contradictionType": "claims-on-track", + "doubt": "'Current schedule' could mean the new date, but nothing says the date changed.", + "matchedBy": "exact project name (case and punctuation normalised), unique in both releases", + "source": { + "current": { + "release": "IPA Annual Report 2018-19 (data as at 30 Sep 2018)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2019", + "csv": "https://assets.publishing.service.gov.uk/media/5d2dd08d40f0b64a8626b762/Annual_Report_on_Major_Projects_2018_to_2019__consolidated_data_and_narratives.csv" + }, + "previous": { + "release": "IPA Annual Report 2017-18 (data as at 30 Sep 2017)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2018", + "csv": "https://assets.publishing.service.gov.uk/media/5b3e2e2340f0b678bc5d018c/csv-ipa-government-major-projects-portfolio-data-september-2017.csv" + } + } + }, + { + "id": "PLH2-B07", + "gmppId": null, + "gmppIdSource": null, + "project": "Prison Estate Transformation Programme (PETP)", + "department": "MOJ", + "prevYear": 2018, + "year": 2019, + "prevRelease": "2017-18", + "release": "2018-19", + "prevEnd": "2021-12-31", + "curEnd": "2026-05-07", + "prevEndAsPublished": "31/12/21", + "curEndAsPublished": "07/05/2026", + "daysMoved": 1588, + "narrative": "The programme remains on schedule in line with agreed business case and budgetary approvals", + "label": "contradiction", + "why": "End date moved 1,588 days later (31 Dec 2021 -> 7 May 2026). The whole narrative is 'The programme remains on schedule in line with agreed business case and budgetary approvals'. It states no move.", + "contradictionType": "claims-on-track", + "prevDepartment": "MoJ", + "matchedBy": "exact project name (case and punctuation normalised), unique in both releases", + "source": { + "current": { + "release": "IPA Annual Report 2018-19 (data as at 30 Sep 2018)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2019", + "csv": "https://assets.publishing.service.gov.uk/media/5d2dd08d40f0b64a8626b762/Annual_Report_on_Major_Projects_2018_to_2019__consolidated_data_and_narratives.csv" + }, + "previous": { + "release": "IPA Annual Report 2017-18 (data as at 30 Sep 2017)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2018", + "csv": "https://assets.publishing.service.gov.uk/media/5b3e2e2340f0b678bc5d018c/csv-ipa-government-major-projects-portfolio-data-september-2017.csv" + } + } + }, + { + "id": "PLH2-B08", + "gmppId": "DEFRA_0006_1516-Q1", + "gmppIdSource": "from the 2019-20 release, same project name", + "project": "DEFRA UNITY PROGRAMME", + "department": "DEFRA", + "prevYear": 2018, + "year": 2019, + "prevRelease": "2017-18", + "release": "2018-19", + "prevEnd": "2018-10-31", + "curEnd": "2020-04-30", + "prevEndAsPublished": "31/10/2018", + "curEndAsPublished": "30/04/2020", + "daysMoved": 547, + "narrative": "The high level plan for UnITy continues to make significant progress with successfully completing all key service procurements to schedule. In Q2 the programme entered into Implementation phase on all of its service contracts with focus on ensuring technical integration between all services and suppliers happens as smoothly as possible. Since Q2 all services have transitioned on schedule to new suppliers with focus moving to service transformation plnanning and deployment. ", + "label": "contradiction", + "why": "End date moved 547 days later (31 Oct 2018 -> 30 Apr 2020). The narrative reports procurements completed 'to schedule' and services 'transitioned on schedule'. It states no move.", + "contradictionType": "claims-on-track", + "doubt": "The 'on schedule' claims are about procurements and transitions, not explicitly the end date.", + "matchedBy": "exact project name (case and punctuation normalised), unique in both releases", + "source": { + "current": { + "release": "IPA Annual Report 2018-19 (data as at 30 Sep 2018)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2019", + "csv": "https://assets.publishing.service.gov.uk/media/5d2dd08d40f0b64a8626b762/Annual_Report_on_Major_Projects_2018_to_2019__consolidated_data_and_narratives.csv" + }, + "previous": { + "release": "IPA Annual Report 2017-18 (data as at 30 Sep 2017)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2018", + "csv": "https://assets.publishing.service.gov.uk/media/5b3e2e2340f0b678bc5d018c/csv-ipa-government-major-projects-portfolio-data-september-2017.csv" + } + } + }, + { + "id": "PLH2-B09", + "gmppId": "DWP_0009_1112-Q1", + "gmppIdSource": "from the 2019-20 release, same project name", + "project": "Universal Credit Programme", + "department": "DWP", + "prevYear": 2018, + "year": 2019, + "prevRelease": "2017-18", + "release": "2018-19", + "prevEnd": "2022-06-30", + "curEnd": "2023-06-30", + "prevEndAsPublished": "30/06/22", + "curEndAsPublished": "30/06/2023", + "daysMoved": 365, + "narrative": "All critical delivery milestones continue to be delivered on time. The Programme has successfully completed national rollout of the Full Service with rollout to all 637 offices and the move of claimants from legacy benefits to UC is scheduled to commence in July 2019 (initially with a pilot of up to 10,000 claims to ensure that the process works well) and complete in December 2023.", + "label": "contradiction", + "why": "End date moved 365 days later (30 Jun 2022 -> 30 Jun 2023). The narrative says 'All critical delivery milestones continue to be delivered on time' and that migration will 'complete in December 2023'. That is 183 days after the published end date. It states no move.", + "contradictionType": "claims-on-track", + "doubt": "December 2023 is the migration milestone, not explicitly the programme end date.", + "matchedBy": "exact project name (case and punctuation normalised), unique in both releases", + "source": { + "current": { + "release": "IPA Annual Report 2018-19 (data as at 30 Sep 2018)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2019", + "csv": "https://assets.publishing.service.gov.uk/media/5d2dd08d40f0b64a8626b762/Annual_Report_on_Major_Projects_2018_to_2019__consolidated_data_and_narratives.csv" + }, + "previous": { + "release": "IPA Annual Report 2017-18 (data as at 30 Sep 2017)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2018", + "csv": "https://assets.publishing.service.gov.uk/media/5b3e2e2340f0b678bc5d018c/csv-ipa-government-major-projects-portfolio-data-september-2017.csv" + } + } + }, + { + "id": "PLH2-B10", + "gmppId": "DH_0061_1617-Q3", + "gmppIdSource": "from the 2019-20 release, same project name", + "project": "IT Infrastructure Sourcing Programme", + "department": "DHSC", + "prevYear": 2018, + "year": 2019, + "prevRelease": "2017-18", + "release": "2018-19", + "prevEnd": "2019-06-30", + "curEnd": "2019-12-31", + "prevEndAsPublished": "30/06/19", + "curEndAsPublished": "31/12/2019", + "daysMoved": 184, + "narrative": "In house services are on track. Suppliers are in mobilisation and detailed planning will follow in Quarter 3. At this point there is no contra-indicators to achieving our scheduled closure", + "label": "contradiction", + "why": "End date moved 184 days later (30 Jun 2019 -> 31 Dec 2019). The narrative says in-house services are 'on track' and there are 'no contra-indicators to achieving our scheduled closure'. It states no move.", + "contradictionType": "claims-on-track", + "matchedBy": "exact project name (case and punctuation normalised), unique in both releases", + "source": { + "current": { + "release": "IPA Annual Report 2018-19 (data as at 30 Sep 2018)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2019", + "csv": "https://assets.publishing.service.gov.uk/media/5d2dd08d40f0b64a8626b762/Annual_Report_on_Major_Projects_2018_to_2019__consolidated_data_and_narratives.csv" + }, + "previous": { + "release": "IPA Annual Report 2017-18 (data as at 30 Sep 2017)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2018", + "csv": "https://assets.publishing.service.gov.uk/media/5b3e2e2340f0b678bc5d018c/csv-ipa-government-major-projects-portfolio-data-september-2017.csv" + } + } + }, + { + "id": "PLH2-B11", + "gmppId": "MOD_0118_1718-Q3", + "gmppIdSource": "published in this release", + "project": "Clyde Infrastructure", + "department": "MOD", + "prevYear": 2019, + "year": 2020, + "prevRelease": "2018-19", + "release": "2019-20", + "prevEnd": "2024-03-29", + "curEnd": "2032-03-30", + "prevEndAsPublished": "29/03/2024", + "curEndAsPublished": "30/03/2032", + "daysMoved": 2923, + "narrative": "The scheduled project end date at Q2 1920 (30th September 2019) is 30/03/32, due primarily to the following factors;\n\n - 2032 is the end date agreed when the programme was rebalanced during 2017, based on the forecast completion date of all projects within the programme. This date remains extant at this time.\n - The primary drivers for the completion date of the projects include the DREADNOUGHT Class in service date and achieving the endorsed ambition of a Single Integrated Operating Base. The volume of concurrent activity that can be commissioned simultaneously across the site is limited by the need to maintain operations and deconflict activity in a geographically constrained highly secure environment. \n\n Since the Q2 1920 (30th September 2019) baseline project end date of 30/03/32, the following primary project actions have impacted the original Q2 baseline project end date;\n\n - The long term impact of COVID19 on specific projects and the available industrial base is being assessed to understand the impact on the programme completion date. \n - Analysis of the volume of work required to remediate key facilities across the Programme, may require some re-prioritisation of the work against the original 2017 baseline. A Capability Audit has been commissioned to review the Portfolio Definition which could impact on the programme completion date. \n", + "label": "contradiction", + "why": "End date moved 2,923 days later (29 Mar 2024 -> 30 Mar 2032). The narrative says '2032 is the end date agreed when the programme was rebalanced during 2017 ... This date remains extant'. That claims the date has not changed since 2017, yet the previous release published 29 Mar 2024. It states no move.", + "contradictionType": "claims-unchanged", + "doubt": "It explains where the 2032 date comes from, which a lenient reader might count as an explanation.", + "matchedBy": "exact project name (case and punctuation normalised), unique in both releases", + "source": { + "current": { + "release": "IPA Annual Report 2019-20 (data as at 30 Sep 2019)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2020", + "csv": "https://assets.publishing.service.gov.uk/media/5f05de523a6f40041036a2ec/GMPP_Government_Major_Projects_Portfolio_data_September_2019.csv" + }, + "previous": { + "release": "IPA Annual Report 2018-19 (data as at 30 Sep 2018)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2019", + "csv": "https://assets.publishing.service.gov.uk/media/5d2dd08d40f0b64a8626b762/Annual_Report_on_Major_Projects_2018_to_2019__consolidated_data_and_narratives.csv" + } + } + }, + { + "id": "PLH2-B12", + "gmppId": "MOD_0064_1112-Q2", + "gmppIdSource": "published in this release", + "project": "Carrier Enabled Power Projection", + "department": "MOD", + "prevYear": 2019, + "year": 2020, + "prevRelease": "2018-19", + "release": "2019-20", + "prevEnd": "2030-12-01", + "curEnd": "2030-12-31", + "prevEndAsPublished": "01/12/2030", + "curEndAsPublished": "31/12/2030", + "daysMoved": 30, + "narrative": "The scheduled baseline project end date at Q2 1920 (30th September 2019) is 01/12/26, has shortened by 1461 days since last year's Q2 1819 date of 01/12/30, due primarily to the following factors;\n\n - CEPP is on track to deliver IOC(CS) by 31 Dec 20, FOC(CS) by 31 Dec 23 and FOC (CEPP) by 1 Apr 26 as per the mandate.\n\n Since the Q2 1920 (30th September 2019) baseline project end date of 01/12/26, the following non-project operating environment activities have impacted the original Q2 baseline project end date;\n\n - Covid-19 may well have an impact on IOC(CS) on 31 Dec 20, but all SROs are working hard to mitigate any affects. The programme is still on track.\n\n Since the Q2 1920 (30th September 2019) baseline project end date of 01/12/26, the following primary project actions have impacted the original Q2 baseline project end date;\n\n - A regular process of review has been instigated to monitor/mitigate the effects of Covid-19.\n", + "label": "contradiction", + "why": "End date moved 30 days later (1 Dec 2030 -> 31 Dec 2030). The template sentence says the end date 'is 01/12/26, has shortened by 1461 days'. That names a current end date 4 years before the published one, in the opposite direction.", + "contradictionType": "names-different-date", + "doubt": "It states a change, but not the published one.", + "matchedBy": "exact project name (case and punctuation normalised), unique in both releases", + "source": { + "current": { + "release": "IPA Annual Report 2019-20 (data as at 30 Sep 2019)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2020", + "csv": "https://assets.publishing.service.gov.uk/media/5f05de523a6f40041036a2ec/GMPP_Government_Major_Projects_Portfolio_data_September_2019.csv" + }, + "previous": { + "release": "IPA Annual Report 2018-19 (data as at 30 Sep 2018)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2019", + "csv": "https://assets.publishing.service.gov.uk/media/5d2dd08d40f0b64a8626b762/Annual_Report_on_Major_Projects_2018_to_2019__consolidated_data_and_narratives.csv" + } + } + }, + { + "id": "PLH2-B13", + "gmppId": "DFE_0006_1415-Q3", + "gmppIdSource": "published in this release", + "project": "Priority School Building Programme 2", + "department": "DFE", + "prevYear": 2019, + "year": 2020, + "prevRelease": "2018-19", + "release": "2019-20", + "prevEnd": "2022-12-31", + "curEnd": "2025-02-25", + "prevEndAsPublished": "31/12/2022", + "curEndAsPublished": "25/02/2025", + "daysMoved": 787, + "narrative": "At Q2 19-20 (30th September 2019) we forecasted the programme to be completed by Q1 24-25, with 90% of projects now scheduled to hand over by the end of 2021.\n\n90% of projects are either complete, or construction is scheduled for completion in line with the baseline projection for the programme end date of December 2021 (allowing for a standard 12 months of defects liability period on the relevant construction works). The small percentage of cases (10%) which will be completed after December 2021 all have confirmed programmes for delivery, and just 5 projects are scheduled to complete after December 2022.", + "label": "contradiction", + "why": "End date moved 787 days later (31 Dec 2022 -> 25 Feb 2025). The narrative forecasts completion 'by Q1 24-25' (by 30 Jun 2024, about 240 days before the published date). It also cites 'the baseline projection for the programme end date of December 2021'. It states no move.", + "contradictionType": "names-different-date", + "doubt": "'Forecast' vs the column's 'latest approved' date; the Q1 vs Q4 24-25 gap may reflect defects-liability time.", + "matchedBy": "exact project name (case and punctuation normalised), unique in both releases", + "source": { + "current": { + "release": "IPA Annual Report 2019-20 (data as at 30 Sep 2019)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2020", + "csv": "https://assets.publishing.service.gov.uk/media/5f05de523a6f40041036a2ec/GMPP_Government_Major_Projects_Portfolio_data_September_2019.csv" + }, + "previous": { + "release": "IPA Annual Report 2018-19 (data as at 30 Sep 2018)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2019", + "csv": "https://assets.publishing.service.gov.uk/media/5d2dd08d40f0b64a8626b762/Annual_Report_on_Major_Projects_2018_to_2019__consolidated_data_and_narratives.csv" + } + } + }, + { + "id": "PLH2-B14", + "gmppId": "HMRC_0012_1415-Q1", + "gmppIdSource": "from the 2019-20 release, same project name", + "project": "Tax-Free Childcare", + "department": "HMRC", + "prevYear": 2017, + "year": 2018, + "prevRelease": "2016-17", + "release": "2017-18", + "prevEnd": "2018-06-30", + "curEnd": "2018-09-30", + "prevEndAsPublished": "30/06/2018", + "curEndAsPublished": "30/09/18", + "daysMoved": 92, + "narrative": "The programme had a public commitment to start its phased, age based rollout of TFC from early 2017. The programme started a Trial of the childcare service in November 2016 and decided to extend the Trial through to April 2017 in order to deliver and test new functionality as part of the Trial. This pushed the planned go live date back slightly and moved the programme end date out by 3 months.", + "label": "explained", + "why": "Moved 92 days later. The narrative says extending the trial 'moved the programme end date out by 3 months'.", + "matchedBy": "exact project name (case and punctuation normalised), unique in both releases", + "source": { + "current": { + "release": "IPA Annual Report 2017-18 (data as at 30 Sep 2017)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2018", + "csv": "https://assets.publishing.service.gov.uk/media/5b3e2e2340f0b678bc5d018c/csv-ipa-government-major-projects-portfolio-data-september-2017.csv" + }, + "previous": { + "release": "IPA Annual Report 2016-17 (data as at 30 Sep 2016)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2017", + "csv": "https://assets.publishing.service.gov.uk/media/5a821ed6e5274a2e8ab57995/Annual_Report_-_consolidated_data_and_narratives.csv" + } + } + }, + { + "id": "PLH2-B15", + "gmppId": null, + "gmppIdSource": null, + "project": "30 Hrs Free Childcare Project", + "department": "DfE", + "prevYear": 2017, + "year": 2018, + "prevRelease": "2016-17", + "release": "2017-18", + "prevEnd": "2020-03-31", + "curEnd": "2018-09-30", + "prevEndAsPublished": "31/03/2020", + "curEndAsPublished": "30/09/18", + "daysMoved": -548, + "narrative": "The project remains on schedule, with 30 hours childcare places being delivered nationwide from September 2017.\rThe project closure date has been extended to 30 September 2018 to enable the project to effectively monitor and manage a full year of delivery before moving to a business as usual state, rather than as a result of any delay to national rollout.\r", + "label": "explained", + "why": "Moved 548 days earlier (31 Mar 2020 -> 30 Sep 2018). The narrative says 'The project closure date has been extended to 30 September 2018', which names the published new date and states the change.", + "doubt": "It says 'extended', but the published date moved earlier. The opening 'remains on schedule' refers to delivery.", + "matchedBy": "exact project name (case and punctuation normalised), unique in both releases", + "source": { + "current": { + "release": "IPA Annual Report 2017-18 (data as at 30 Sep 2017)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2018", + "csv": "https://assets.publishing.service.gov.uk/media/5b3e2e2340f0b678bc5d018c/csv-ipa-government-major-projects-portfolio-data-september-2017.csv" + }, + "previous": { + "release": "IPA Annual Report 2016-17 (data as at 30 Sep 2016)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2017", + "csv": "https://assets.publishing.service.gov.uk/media/5a821ed6e5274a2e8ab57995/Annual_Report_-_consolidated_data_and_narratives.csv" + } + } + }, + { + "id": "PLH2-B16", + "gmppId": "MOD_0036_1112-Q1", + "gmppIdSource": "from the 2019-20 release, same project name", + "project": "Maritime Sustainment Programme", + "department": "MOD", + "prevYear": 2017, + "year": 2018, + "prevRelease": "2016-17", + "release": "2017-18", + "prevEnd": "2018-04-30", + "curEnd": "2019-02-28", + "prevEndAsPublished": "30/04/2018", + "curEndAsPublished": "28/02/19", + "daysMoved": 304, + "narrative": "Ship 1 ( Tide spring ) has now achieved In-Service Date (ISD) with Ship 2 now completing its UK Customisation. Ship 3 has begun its delivery voyage to the UK and Ship 4 has completed her Build Trials (CSTs) . Delays experienced on Ship 1  have been managed during the build and customisation of  Ships 2 to 4, reducing the impact of the delay during  Ship 1 Build. The Project Team is currently working with the Customer to finalise Full Operating Capability (FOC).", + "label": "explained", + "why": "Moved 304 days later. The narrative states the 'Delays experienced on Ship 1' and how they were managed.", + "doubt": "It states a delay, not explicitly the end-date change.", + "prevDepartment": "MoD", + "matchedBy": "exact project name (case and punctuation normalised), unique in both releases", + "source": { + "current": { + "release": "IPA Annual Report 2017-18 (data as at 30 Sep 2017)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2018", + "csv": "https://assets.publishing.service.gov.uk/media/5b3e2e2340f0b678bc5d018c/csv-ipa-government-major-projects-portfolio-data-september-2017.csv" + }, + "previous": { + "release": "IPA Annual Report 2016-17 (data as at 30 Sep 2016)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2017", + "csv": "https://assets.publishing.service.gov.uk/media/5a821ed6e5274a2e8ab57995/Annual_Report_-_consolidated_data_and_narratives.csv" + } + } + }, + { + "id": "PLH2-B17", + "gmppId": "MOD_0076_1213-Q1", + "gmppIdSource": "from the 2019-20 release, same project name", + "project": "Astute Boats 1-7", + "department": "MOD", + "prevYear": 2018, + "year": 2019, + "prevRelease": "2017-18", + "release": "2018-19", + "prevEnd": "2024-03-31", + "curEnd": "2025-04-30", + "prevEndAsPublished": "31/03/24", + "curEndAsPublished": "30/04/2025", + "daysMoved": 395, + "narrative": "Boat 4 is scheduled to enter sea trials this year. This is behind schedule, and a reapproval is being sought.. Forecast delivery of Boats 5-7 remain inside their respective approvals.", + "label": "explained", + "why": "Moved 395 days later. The narrative says Boat 4 'is behind schedule, and a reapproval is being sought'.", + "doubt": "It states a slip and a reapproval, not the new end date.", + "matchedBy": "exact project name (case and punctuation normalised), unique in both releases", + "source": { + "current": { + "release": "IPA Annual Report 2018-19 (data as at 30 Sep 2018)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2019", + "csv": "https://assets.publishing.service.gov.uk/media/5d2dd08d40f0b64a8626b762/Annual_Report_on_Major_Projects_2018_to_2019__consolidated_data_and_narratives.csv" + }, + "previous": { + "release": "IPA Annual Report 2017-18 (data as at 30 Sep 2017)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2018", + "csv": "https://assets.publishing.service.gov.uk/media/5b3e2e2340f0b678bc5d018c/csv-ipa-government-major-projects-portfolio-data-september-2017.csv" + } + } + }, + { + "id": "PLH2-B18", + "gmppId": "MOD_0101_1516-Q1", + "gmppIdSource": "from the 2019-20 release, same project name", + "project": "New Style of Information Technology (Base)", + "department": "MOD", + "prevYear": 2018, + "year": 2019, + "prevRelease": "2017-18", + "release": "2018-19", + "prevEnd": "2018-03-05", + "curEnd": "2020-03-31", + "prevEndAsPublished": "05/03/18", + "curEndAsPublished": "31/03/2020", + "daysMoved": 757, + "narrative": "New Office 365 capabilities have been paused to release resources to priority projects. Defect remediation of Secret post testing has not progressed as planned and is delaying Secret United Kingdom project delivery, this is also adding further delay to the MODNet Secret Overseas delivery.", + "label": "explained", + "why": "Moved 757 days later. The narrative says capabilities were paused and remediation 'is delaying' delivery, 'adding further delay'.", + "doubt": "It states delays, not the new end date.", + "matchedBy": "exact project name (case and punctuation normalised), unique in both releases", + "source": { + "current": { + "release": "IPA Annual Report 2018-19 (data as at 30 Sep 2018)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2019", + "csv": "https://assets.publishing.service.gov.uk/media/5d2dd08d40f0b64a8626b762/Annual_Report_on_Major_Projects_2018_to_2019__consolidated_data_and_narratives.csv" + }, + "previous": { + "release": "IPA Annual Report 2017-18 (data as at 30 Sep 2017)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2018", + "csv": "https://assets.publishing.service.gov.uk/media/5b3e2e2340f0b678bc5d018c/csv-ipa-government-major-projects-portfolio-data-september-2017.csv" + } + } + }, + { + "id": "PLH2-B19", + "gmppId": "DECC_0010_1112-Q1", + "gmppIdSource": "published in this release", + "project": "Smart Metering Implementation Programme", + "department": "BEIS", + "prevYear": 2019, + "year": 2020, + "prevRelease": "2018-19", + "release": "2019-20", + "prevEnd": "2020-12-31", + "curEnd": "2024-12-31", + "prevEndAsPublished": "31/12/2020", + "curEndAsPublished": "31/12/2024", + "daysMoved": 1461, + "narrative": "The scheduled baseline project end date at Q2 1920 (30th September 2019) is 31/12/24, has lengthened by 1461 days since last year's Q2 1819 date of 31/12/20, due primarily to the following factors;\n\n - The Programme is on schedule to meet the commitment for every home and small business to be offered a Smart Meter by the end of 2020. \n - The updated 2019 Cost-Benefit Analysis includes an extended appraisal period so the Programme has consulted on the introduction of a new regulatory framework for energy suppliers that supports market-wide rollout of smart meters as soon as practicable.\n\n Since the Q2 1920 (30th September 2019) baseline project end date of 31/12/24, the following primary project actions have impacted the original Q2 baseline project end date;\n\n - A thorough evaluation of the new regulatory framework consultation responses has been conducted.\n - The impact of COVID-19 is being considered with key stakeholders and assessed by the Programme.\n", + "label": "explained", + "why": "Moved 1,461 days later. The narrative says the end date 'is 31/12/24, has lengthened by 1461 days since last year's ... date of 31/12/20'. Both dates match the column. 'On schedule' refers to the 2020 offer commitment.", + "matchedBy": "exact project name (case and punctuation normalised), unique in both releases", + "source": { + "current": { + "release": "IPA Annual Report 2019-20 (data as at 30 Sep 2019)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2020", + "csv": "https://assets.publishing.service.gov.uk/media/5f05de523a6f40041036a2ec/GMPP_Government_Major_Projects_Portfolio_data_September_2019.csv" + }, + "previous": { + "release": "IPA Annual Report 2018-19 (data as at 30 Sep 2018)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2019", + "csv": "https://assets.publishing.service.gov.uk/media/5d2dd08d40f0b64a8626b762/Annual_Report_on_Major_Projects_2018_to_2019__consolidated_data_and_narratives.csv" + } + } + }, + { + "id": "PLH2-B20", + "gmppId": "DfT_0023_1516-Q3", + "gmppIdSource": "published in this release", + "project": "Heathrow Expansion Programme", + "department": "DFT", + "prevYear": 2019, + "year": 2020, + "prevRelease": "2018-19", + "release": "2019-20", + "prevEnd": "2029-12-31", + "curEnd": "2050-12-31", + "prevEndAsPublished": "31/12/2029", + "curEndAsPublished": "31/12/2050", + "daysMoved": 7670, + "narrative": "The scheduled baseline project end date at Q2 1920 (30th September 2019) is 31/12/50, has lengthened by 7670 days since last year's Q2 1819 date of 31/12/29, due primarily to the following factors;\n\n - The Project End Date baseline was updated to reflect Heathrow’s decision to phase terminal capacity expansion and other development works over a longer time period (up to 2050) to manage costs and build terminal capacity in line with demand growth.\n - The ANPS stated there was a need for Heathrow to deliver new airport capacity (an operational runway) by 2030. The actual delivery date will be dependent on Heathrow's timescales (the target date as of Jan 2020 for an operational runway was 2028/29, although it was recognised that this was becoming increasingly challenging to deliver the runway to this timescale given the scale and complexity of the project.\n\n Since the Q2 1920 (30th September 2019) baseline project end date of 31/12/50, the following non-project operating environment activities have impacted the original Q2 baseline project end date;\n\n - On 27th February 2020 the Court of Appeal ruled that when designating the Airports National Policy Statement (ANPS), the previous Government did not take account of the Paris Agreement, non-CO2 emissions and emissions post-2050. The ANPS has no legal effect until reviewed by the Government under the Planning Act 2008.\n - All reporting on the programme was paused and has not changed since the Court of Appeal's ruling of the ANPS on 27th February 2020.\n\n Since the Q2 1920 (30th September 2019) baseline project end date of 31/12/50, the following primary project actions have impacted the original Q2 baseline project end date;\n\n - There have been no further change to the rebaselined project end date.\n - Following the publication of the CAA position on Cat C costs, Heathrow confirmed in January 2020 that their schedule for the opening of the runway had been delayed for 2 years to 2028-29. This was to reflect the need to phase the costs over a longer period. HEP were awaiting further clarification of Heathrow's detailed schedule.\n - All reporting on the programme was paused and has not changed since the Court of Appeal's ruling of the ANPS on 27th February 2020.", + "label": "explained", + "why": "Moved 7,670 days later. The narrative says 'has lengthened by 7670 days' to 31/12/50 and gives the reason (phased expansion to 2050).", + "matchedBy": "exact project name (case and punctuation normalised), unique in both releases", + "source": { + "current": { + "release": "IPA Annual Report 2019-20 (data as at 30 Sep 2019)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2020", + "csv": "https://assets.publishing.service.gov.uk/media/5f05de523a6f40041036a2ec/GMPP_Government_Major_Projects_Portfolio_data_September_2019.csv" + }, + "previous": { + "release": "IPA Annual Report 2018-19 (data as at 30 Sep 2018)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2019", + "csv": "https://assets.publishing.service.gov.uk/media/5d2dd08d40f0b64a8626b762/Annual_Report_on_Major_Projects_2018_to_2019__consolidated_data_and_narratives.csv" + } + } + }, + { + "id": "PLH2-B21", + "gmppId": "DFT_0005_1112-Q1", + "gmppIdSource": "published in this release", + "project": "Intercity Express Programme", + "department": "DFT", + "prevYear": 2019, + "year": 2020, + "prevRelease": "2018-19", + "release": "2019-20", + "prevEnd": "2020-02-06", + "curEnd": "2020-06-04", + "prevEndAsPublished": "06/02/2020", + "curEndAsPublished": "04/06/2020", + "daysMoved": 119, + "narrative": "The scheduled baseline project end date at Q2 1920 (30th September 2019) is 04/06/20, has lengthened by 119 days since last year's Q2 1819 date of 06/02/20, due primarily to the following factors;\n\n - The Department entered a new agreement with the Train Service Provider setting a new project end date of June 2020 to provide time to resolve electromagnetic interference issues and to facilitate later entry into service of the East Coast fleet.\n\n Since the Q2 1920 (30th September 2019) baseline project end date of 04/06/20, the following non-project operating environment activities have impacted the original Q2 baseline project end date;\n\n - COVID-19 and related social distancing measures have impacted the planned roll out of the remaining 9 trains.\n\n Since the Q2 1920 (30th September 2019) baseline project end date of 04/06/20, the following primary project actions have impacted the original Q2 baseline project end date;\n\n - Lockdown and implementation of social distancing measures have impacted manufacturing productivity, the Department is working closely with stakeholders to mitigate the effects on the programme. Challenges remain around benefits realisation including the need to improve train performance and completing the full roll-out of the fleet on the East Coast expected in Autumn 2020.\n", + "label": "explained", + "why": "Moved 119 days later. The narrative says 'has lengthened by 119 days' and that a new agreement set 'a new project end date of June 2020'.", + "matchedBy": "exact project name (case and punctuation normalised), unique in both releases", + "source": { + "current": { + "release": "IPA Annual Report 2019-20 (data as at 30 Sep 2019)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2020", + "csv": "https://assets.publishing.service.gov.uk/media/5f05de523a6f40041036a2ec/GMPP_Government_Major_Projects_Portfolio_data_September_2019.csv" + }, + "previous": { + "release": "IPA Annual Report 2018-19 (data as at 30 Sep 2018)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2019", + "csv": "https://assets.publishing.service.gov.uk/media/5d2dd08d40f0b64a8626b762/Annual_Report_on_Major_Projects_2018_to_2019__consolidated_data_and_narratives.csv" + } + } + }, + { + "id": "PLH2-B22", + "gmppId": "HO_0016_1213-Q1", + "gmppIdSource": "published in this release", + "project": "Emergency Services Mobile Communications Programme (ESMCP)", + "department": "HO", + "prevYear": 2019, + "year": 2020, + "prevRelease": "2018-19", + "release": "2019-20", + "prevEnd": "2020-12-31", + "curEnd": "2022-12-31", + "prevEndAsPublished": "31/12/2020", + "curEndAsPublished": "31/12/2022", + "daysMoved": 730, + "narrative": "The scheduled baseline project end date at Q2 1920 (30th September 2019) is 31/12/22, has lengthened by 730 days since last year's Q2 1819 date of 31/12/20, due primarily to the following factors;\n\n - The programme under went an extensive review and an incremental delivery of ESN was introduced. The review also included work to assess the length of time users needed to transition from the current Airwave service to ESN. \n\n Since the Q2 1920 (30th September 2019) baseline project end date of 31/12/22, the following non-project operating environment activities have impacted the original Q2 baseline project end date;\n\n - With regards to COVID-19, roll out of ESN in the underground and remote site mast builds are being impacted. However, the programme is working to preserve the critical path as far as possible. \n\n\n Since the Q2 1920 (30th September 2019) baseline project end date of 31/12/22, the following primary project actions have impacted the original Q2 baseline project end date;\n\n - An updated Programme Business Case is planned for Q2 2020 to reflect the revised programme delivery plans and provide greater certainty around the National Shutdown date for Airwave of 31 December 2022.\n - The programme has worked to align the plan to the budget available from the 20-21 top slice, with a view to phasing spend but hold to the programme's critical path. \n", + "label": "explained", + "why": "Moved 730 days later. The narrative says 'has lengthened by 730 days' to 31/12/22 after an extensive review.", + "matchedBy": "exact project name (case and punctuation normalised), unique in both releases", + "source": { + "current": { + "release": "IPA Annual Report 2019-20 (data as at 30 Sep 2019)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2020", + "csv": "https://assets.publishing.service.gov.uk/media/5f05de523a6f40041036a2ec/GMPP_Government_Major_Projects_Portfolio_data_September_2019.csv" + }, + "previous": { + "release": "IPA Annual Report 2018-19 (data as at 30 Sep 2018)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2019", + "csv": "https://assets.publishing.service.gov.uk/media/5d2dd08d40f0b64a8626b762/Annual_Report_on_Major_Projects_2018_to_2019__consolidated_data_and_narratives.csv" + } + } + }, + { + "id": "PLH2-B23", + "gmppId": "MOD_0001_1112-Q1", + "gmppIdSource": "published in this release", + "project": "A400M", + "department": "MOD", + "prevYear": 2019, + "year": 2020, + "prevRelease": "2018-19", + "release": "2019-20", + "prevEnd": "2023-03-31", + "curEnd": "2024-03-31", + "prevEndAsPublished": "31/03/2023", + "curEndAsPublished": "31/03/2024", + "daysMoved": 366, + "narrative": "The scheduled baseline project end date at Q2 1920 (30th September 2019) is 31/03/24, has lengthened by 366 days since last year's Q2 1819 date of 31/03/23, due primarily to the following factors;\n\n - The ongoing Global Re-Baselining of the international Programme had undermined our ability to accurately judge the baseline project end date.\n - The date of 31 Mar 2024 account for this, and is in-line with the Mandate, which was revised post-Global Rebaselining.\n\n Since the Q2 1920 (30th September 2019) baseline project end date of 31/03/24, the following primary project actions have impacted the original Q2 baseline project end date;\n\n - The graduation criteria for a number of capabilities have been agreed in the last 6-months. This will have a positive impact and an expansion of the A400M's tactical capabilities on the front line. \n - Recognising the challenges posed by aircraft availability, the trials and evaluation community has been flexible in their approach to gathering the evidence required to support capability enhancements. As a result, the evidence to support the transfer of a natural surface landing strip capability to front line crews is planned for 2020.\n", + "label": "explained", + "why": "Moved 366 days later. The narrative says 'has lengthened by 366 days' to 31/03/24 because of the Global Re-Baselining.", + "matchedBy": "exact project name (case and punctuation normalised), unique in both releases", + "source": { + "current": { + "release": "IPA Annual Report 2019-20 (data as at 30 Sep 2019)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2020", + "csv": "https://assets.publishing.service.gov.uk/media/5f05de523a6f40041036a2ec/GMPP_Government_Major_Projects_Portfolio_data_September_2019.csv" + }, + "previous": { + "release": "IPA Annual Report 2018-19 (data as at 30 Sep 2018)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2019", + "csv": "https://assets.publishing.service.gov.uk/media/5d2dd08d40f0b64a8626b762/Annual_Report_on_Major_Projects_2018_to_2019__consolidated_data_and_narratives.csv" + } + } + }, + { + "id": "PLH2-B24", + "gmppId": "MOJ_0042_1819-Q2", + "gmppIdSource": "published in this release", + "project": "Probation Programme", + "department": "MoJ", + "prevYear": 2019, + "year": 2020, + "prevRelease": "2018-19", + "release": "2019-20", + "prevEnd": "2020-03-01", + "curEnd": "2021-04-01", + "prevEndAsPublished": "01/03/2020", + "curEndAsPublished": "01/04/2021", + "daysMoved": 396, + "narrative": "The scheduled baseline project end date at Q2 1920 (30th September 2019) is 01/04/21, has lengthened by 396 days since last year's Q2 1819 date of 01/03/20, due primarily to the following factors;\n\n - Previous business cases considered alternative options to the Unified Model including a full inhouse option, a re-procurement of CRC contracts and an option that adopted the UM in Wales, and a re-procurement option in England, but these have since been ruled out. The baseline end date has been re-assessed based on the preferred option of a Unified Model \n - Extension of the current Community Rehabilitation Companies (CRCs) \n - To ensure adequate time to complete competition to put in place new CRC providers; to subsequently ensure a safe and effective mobilisation to new provider; and to provide contingency to ensure effective transition to the new Target Operating Model. \n\n Since the Q2 1920 (30th September 2019) baseline project end date of 01/04/21, the following non-project operating environment activities have impacted the original Q2 baseline project end date;\n\n - The numbers are heavily based on assumptions until a more detailed model has been available. Numbers are still to be finalised hence the baseline is still subject to SR negotiations but forecast has been raised as pressure risk to HMPPS.\n\n Since the Q2 1920 (30th September 2019) baseline project end date of 01/04/21, the following primary project actions have impacted the original Q2 baseline project end date;\n\n - Decision to extend current CRC contracts.\n", + "label": "explained", + "why": "Moved 396 days later. The narrative says 'has lengthened by 396 days' and that the baseline end date was re-assessed.", + "prevDepartment": "MOJ", + "matchedBy": "exact project name (case and punctuation normalised), unique in both releases", + "source": { + "current": { + "release": "IPA Annual Report 2019-20 (data as at 30 Sep 2019)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2020", + "csv": "https://assets.publishing.service.gov.uk/media/5f05de523a6f40041036a2ec/GMPP_Government_Major_Projects_Portfolio_data_September_2019.csv" + }, + "previous": { + "release": "IPA Annual Report 2018-19 (data as at 30 Sep 2018)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2019", + "csv": "https://assets.publishing.service.gov.uk/media/5d2dd08d40f0b64a8626b762/Annual_Report_on_Major_Projects_2018_to_2019__consolidated_data_and_narratives.csv" + } + } + }, + { + "id": "PLH2-B25", + "gmppId": "MOD_0085_1314-Q2", + "gmppIdSource": "published in this release", + "project": "Army Basing Programme", + "department": "MOD", + "prevYear": 2019, + "year": 2020, + "prevRelease": "2018-19", + "release": "2019-20", + "prevEnd": "2021-11-26", + "curEnd": "2021-03-31", + "prevEndAsPublished": "26/11/2021", + "curEndAsPublished": "31/03/2021", + "daysMoved": -240, + "narrative": "The scheduled baseline project end date at Q2 1920 (30th September 2019) is 31/03/21, has shortened by 240 days since last year's Q2 1819 date of 26/11/21, due primarily to the following factors;\n\n - This reflected the agreement of an updated mandate for the Programme, reflecting the impact on the Programme of the Better Defence Estate strategy, and subsequently Army 2020 Refine.\n - These factors had a material impact on the Programme, either by affecting the long-term future of sites the Army Basing Programme had planned to invest in, or by changing the Unit laydown on retained sites.\n - The updated Mandate affirmed the Senior Responsible Owner's intention of graduating the Programme in Mar 21, accepting that a small number of Army Basing Programme projects would continue to deliver improved infrastructure for units in situ beyond this date.\n\n Since the Q2 1920 (30th September 2019) baseline project end date of 31/03/21, the following non-project operating environment activities have impacted the original Q2 baseline project end date;\n\n - The recent COVID19 outbreak has impacted on the Programme. While this will not have a material bearing on the Army Basing Programme’s strategic goals, it has affected the schedule and costs of the remaining projects, though as at Apr 20, it is too early to quantify the extent of this impact.\n\n Since the Q2 1920 (30th September 2019) baseline project end date of 31/03/21, the following primary project actions have impacted the original Q2 baseline project end date;\n\n - The Infrastructure and Projects Authority Review, conducted in Feb 20, provided a GREEN Confidence Assessment and recommended the Senior Responsible Owner explore early graduation from the Government Major Projects Portfolio. The Senior Responsible Owner accepted this recommendation subject to the development of a realistic and achievable graduation plan. \n - As a result, the Programme is planning to graduate from the Defence Major Programmes Portfolio in Autumn 2020, and a plan to achieve this is being developed.\n - The Senior Responsible Owner is clear the final decision to graduate will be condition based, with a final judgement to invoke an Infrastructure and Projects Authority Exit Review to be made in Summer 2020, based on satisfactory progress against the Graduation Plan.", + "label": "explained", + "why": "Moved 240 days earlier. The narrative says 'has shortened by 240 days' to 31/03/21 under an updated mandate.", + "matchedBy": "exact project name (case and punctuation normalised), unique in both releases", + "source": { + "current": { + "release": "IPA Annual Report 2019-20 (data as at 30 Sep 2019)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2020", + "csv": "https://assets.publishing.service.gov.uk/media/5f05de523a6f40041036a2ec/GMPP_Government_Major_Projects_Portfolio_data_September_2019.csv" + }, + "previous": { + "release": "IPA Annual Report 2018-19 (data as at 30 Sep 2018)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2019", + "csv": "https://assets.publishing.service.gov.uk/media/5d2dd08d40f0b64a8626b762/Annual_Report_on_Major_Projects_2018_to_2019__consolidated_data_and_narratives.csv" + } + } + }, + { + "id": "PLH2-B26", + "gmppId": "MOJ_0032_1617-Q2", + "gmppIdSource": "from the 2019-20 release, same project name", + "project": "MoJ Future FM", + "department": "MoJ", + "prevYear": 2017, + "year": 2018, + "prevRelease": "2016-17", + "release": "2017-18", + "prevEnd": "2018-04-01", + "curEnd": "2018-04-01", + "prevEndAsPublished": "01/04/2018", + "curEndAsPublished": "01/04/18", + "daysMoved": 0, + "narrative": "The new contract commencement date has been moved back by four weeks due to an extension of time being awarded to bidders during the tender period. \r\rThe overall start and end dates of the programme are unaffected by the extension of tender time.\r\rTenders have been successfully received and the initial evaluation and moderation of the qualitative bids has been completed to time. The programme is on target to complete evaluation and commence the FBC approvals by early April 2017.", + "label": "no-move", + "why": "Published end date unchanged (1 Apr 2018). The narrative says the contract start 'has been moved back by four weeks' but 'The overall start and end dates of the programme are unaffected'.", + "doubt": "False-positive test: move words about a milestone.", + "matchedBy": "exact project name (case and punctuation normalised), unique in both releases", + "source": { + "current": { + "release": "IPA Annual Report 2017-18 (data as at 30 Sep 2017)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2018", + "csv": "https://assets.publishing.service.gov.uk/media/5b3e2e2340f0b678bc5d018c/csv-ipa-government-major-projects-portfolio-data-september-2017.csv" + }, + "previous": { + "release": "IPA Annual Report 2016-17 (data as at 30 Sep 2016)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2017", + "csv": "https://assets.publishing.service.gov.uk/media/5a821ed6e5274a2e8ab57995/Annual_Report_-_consolidated_data_and_narratives.csv" + } + } + }, + { + "id": "PLH2-B27", + "gmppId": "DFE_0009_1617-Q2", + "gmppIdSource": "from the 2019-20 release, same project name", + "project": "Apprenticeships Reform Programme", + "department": "DfE", + "prevYear": 2017, + "year": 2018, + "prevRelease": "2016-17", + "release": "2017-18", + "prevEnd": "2021-04-01", + "curEnd": "2021-04-01", + "prevEndAsPublished": "01/04/2021", + "curEndAsPublished": "01/04/21", + "daysMoved": 0, + "narrative": "Critical milestones and schedule remain on track. Transfers minimum viable service Apr 2018, Non-Levy Beta Apr 2018, Frameworks to standards shift complete Mar 2020.", + "label": "no-move", + "why": "Published end date unchanged (1 Apr 2021). The narrative says 'Critical milestones and schedule remain on track.'", + "matchedBy": "exact project name (case and punctuation normalised), unique in both releases", + "source": { + "current": { + "release": "IPA Annual Report 2017-18 (data as at 30 Sep 2017)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2018", + "csv": "https://assets.publishing.service.gov.uk/media/5b3e2e2340f0b678bc5d018c/csv-ipa-government-major-projects-portfolio-data-september-2017.csv" + }, + "previous": { + "release": "IPA Annual Report 2016-17 (data as at 30 Sep 2016)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2017", + "csv": "https://assets.publishing.service.gov.uk/media/5a821ed6e5274a2e8ab57995/Annual_Report_-_consolidated_data_and_narratives.csv" + } + } + }, + { + "id": "PLH2-B28", + "gmppId": "DCMS_0009_1516-Q4", + "gmppIdSource": "from the 2019-20 release, same project name", + "project": "700 MHz Clearance Programme", + "department": "DCMS", + "prevYear": 2017, + "year": 2018, + "prevRelease": "2016-17", + "release": "2017-18", + "prevEnd": "2022-01-01", + "curEnd": "2022-01-01", + "prevEndAsPublished": "01/01/2022", + "curEndAsPublished": "1/1/2022", + "daysMoved": 0, + "narrative": "The September 2017 review confirmed that delivery was on track and that remained the case at the end of 2017. Clearance events continue to take place in 2018. ", + "label": "no-move", + "why": "Published end date unchanged (1 Jan 2022; written 01/01/2022 and 1/1/2022). The narrative says delivery was on track.", + "doubt": "Tests date-format normalisation.", + "matchedBy": "exact project name (case and punctuation normalised), unique in both releases", + "source": { + "current": { + "release": "IPA Annual Report 2017-18 (data as at 30 Sep 2017)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2018", + "csv": "https://assets.publishing.service.gov.uk/media/5b3e2e2340f0b678bc5d018c/csv-ipa-government-major-projects-portfolio-data-september-2017.csv" + }, + "previous": { + "release": "IPA Annual Report 2016-17 (data as at 30 Sep 2016)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2017", + "csv": "https://assets.publishing.service.gov.uk/media/5a821ed6e5274a2e8ab57995/Annual_Report_-_consolidated_data_and_narratives.csv" + } + } + }, + { + "id": "PLH2-B29", + "gmppId": "DFT_0028_1617-Q1", + "gmppIdSource": "from the 2019-20 release, same project name", + "project": "North of England Programme", + "department": "DFT", + "prevYear": 2018, + "year": 2019, + "prevRelease": "2017-18", + "release": "2018-19", + "prevEnd": "2022-12-31", + "curEnd": "2022-12-31", + "prevEndAsPublished": "31/12/22", + "curEndAsPublished": "31/12/2022", + "daysMoved": 0, + "narrative": "Following the two-year delay to the Manchester – Preston upgrade, caused by difficult ground conditions and Carillion’s failure, electric trains started operating on the route in February 2019. We continue to work with NR on infrastructure improvements across the north including platform extensions which are being progressively rolled out to enable the deployment of longer trains in the May and December 2019 timetable changes. The NoE programme is expected to be completed by 2022. The TRU programme is in early stages of development.", + "label": "no-move", + "why": "Published end date unchanged (31 Dec 2022). The narrative describes 'the two-year delay to the Manchester – Preston upgrade' but says the programme 'is expected to be completed by 2022'.", + "doubt": "False-positive test: a sub-project delay.", + "prevDepartment": "DfT", + "matchedBy": "exact project name (case and punctuation normalised), unique in both releases", + "source": { + "current": { + "release": "IPA Annual Report 2018-19 (data as at 30 Sep 2018)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2019", + "csv": "https://assets.publishing.service.gov.uk/media/5d2dd08d40f0b64a8626b762/Annual_Report_on_Major_Projects_2018_to_2019__consolidated_data_and_narratives.csv" + }, + "previous": { + "release": "IPA Annual Report 2017-18 (data as at 30 Sep 2017)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2018", + "csv": "https://assets.publishing.service.gov.uk/media/5b3e2e2340f0b678bc5d018c/csv-ipa-government-major-projects-portfolio-data-september-2017.csv" + } + } + }, + { + "id": "PLH2-B30", + "gmppId": "CO_0015_1516-Q2", + "gmppIdSource": "from the 2019-20 release, same project name", + "project": "GOV UK Verify", + "department": "CO", + "prevYear": 2018, + "year": 2019, + "prevRelease": "2017-18", + "release": "2018-19", + "prevEnd": "2020-03-31", + "curEnd": "2020-03-31", + "prevEndAsPublished": "31/03/20", + "curEndAsPublished": "31/03/2020", + "daysMoved": 0, + "narrative": "The programme has revised plans to deliver on schedule which are being validated with HMT/IPA.", + "label": "no-move", + "why": "Published end date unchanged (31 Mar 2020). The narrative says the programme 'has revised plans to deliver on schedule'.", + "prevProject": "Gov UK Verify", + "matchedBy": "exact project name (case and punctuation normalised), unique in both releases", + "source": { + "current": { + "release": "IPA Annual Report 2018-19 (data as at 30 Sep 2018)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2019", + "csv": "https://assets.publishing.service.gov.uk/media/5d2dd08d40f0b64a8626b762/Annual_Report_on_Major_Projects_2018_to_2019__consolidated_data_and_narratives.csv" + }, + "previous": { + "release": "IPA Annual Report 2017-18 (data as at 30 Sep 2017)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2018", + "csv": "https://assets.publishing.service.gov.uk/media/5b3e2e2340f0b678bc5d018c/csv-ipa-government-major-projects-portfolio-data-september-2017.csv" + } + } + }, + { + "id": "PLH2-B31", + "gmppId": "HO_0030_1415-Q1", + "gmppIdSource": "from the 2019-20 release, same project name", + "project": "Metis Programme", + "department": "HO", + "prevYear": 2018, + "year": 2019, + "prevRelease": "2017-18", + "release": "2018-19", + "prevEnd": "2019-06-01", + "curEnd": "2019-06-01", + "prevEndAsPublished": "01/06/19", + "curEndAsPublished": "01/06/2019", + "daysMoved": 0, + "narrative": "The programme successfully completed design work for Phase 1 and completed testing of the solution. As a result of defects that surfaced in testing the programme extended the testing phase which impacted Phase 1 go-live. For Phase 2 activity design workshops are underway. Subsequently the Programme successfully delivered Phase 1 to the Department in December 2018.\n", + "label": "no-move", + "why": "Published end date unchanged (1 Jun 2019). The narrative says testing was extended, which 'impacted Phase 1 go-live'.", + "doubt": "False-positive test: a phase delay.", + "matchedBy": "exact project name (case and punctuation normalised), unique in both releases", + "source": { + "current": { + "release": "IPA Annual Report 2018-19 (data as at 30 Sep 2018)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2019", + "csv": "https://assets.publishing.service.gov.uk/media/5d2dd08d40f0b64a8626b762/Annual_Report_on_Major_Projects_2018_to_2019__consolidated_data_and_narratives.csv" + }, + "previous": { + "release": "IPA Annual Report 2017-18 (data as at 30 Sep 2017)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2018", + "csv": "https://assets.publishing.service.gov.uk/media/5b3e2e2340f0b678bc5d018c/csv-ipa-government-major-projects-portfolio-data-september-2017.csv" + } + } + }, + { + "id": "PLH2-B32", + "gmppId": "DFT_0020_1314-Q2", + "gmppIdSource": "published in this release", + "project": "A14 Cambridge to Huntingdon Improvement Scheme", + "department": "DFT", + "prevYear": 2019, + "year": 2020, + "prevRelease": "2018-19", + "release": "2019-20", + "prevEnd": "2021-09-30", + "curEnd": "2021-09-30", + "prevEndAsPublished": "30/09/2021", + "curEndAsPublished": "30/09/2021", + "daysMoved": 0, + "narrative": "The scheduled baseline project end date at Q2 1920 (30th September 2019) is 30/09/21, has not changed since last year's Q2 1819 date of 30/09/21, due primarily to the following factors;\n\n - The completion date has not slipped due to the project being able to accurately re-sequence activities to mitigate delays, to drive improvements and to maximise productivity where opportunities have been presented.\n - Innovative ways of working to drive improvements have been actively promoted on the project including: locating site batching plants on-site; collaborative and production based work scheduling; and project dedicated resources to promote productivity and lean initiatives.\n\n Since the Q2 1920 (30th September 2019) baseline project end date of 30/09/21, the following primary project actions have impacted the original Q2 baseline project end date;\n\n - There has been no change to the baseline project end date; despite some weather events in 19/20 the project has been able to maintain its programme. This is due to the continuous reviews of programme and critical path analysis. The project has applied mitigation measures and the use of collaboration and lean methodology adding confidence to the achieve the projects forecasted end date.\n - The project successfully opened for traffic ahead of schedule in May 2020 with the works to Huntingdon town centre progressing well, adding confidence to the achieve the project's end date.\n", + "label": "no-move", + "why": "Published end date unchanged (30 Sep 2021). The narrative says it 'has not changed' and 'The completion date has not slipped'.", + "matchedBy": "exact project name (case and punctuation normalised), unique in both releases", + "source": { + "current": { + "release": "IPA Annual Report 2019-20 (data as at 30 Sep 2019)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2020", + "csv": "https://assets.publishing.service.gov.uk/media/5f05de523a6f40041036a2ec/GMPP_Government_Major_Projects_Portfolio_data_September_2019.csv" + }, + "previous": { + "release": "IPA Annual Report 2018-19 (data as at 30 Sep 2018)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2019", + "csv": "https://assets.publishing.service.gov.uk/media/5d2dd08d40f0b64a8626b762/Annual_Report_on_Major_Projects_2018_to_2019__consolidated_data_and_narratives.csv" + } + } + }, + { + "id": "PLH2-B33", + "gmppId": "DCMS_0011_1718-Q3", + "gmppIdSource": "published in this release", + "project": "5G Testbeds & Trials", + "department": "DCMS", + "prevYear": 2019, + "year": 2020, + "prevRelease": "2018-19", + "release": "2019-20", + "prevEnd": "2021-03-31", + "curEnd": "2021-03-31", + "prevEndAsPublished": "31/03/2021", + "curEndAsPublished": "31/03/2021", + "daysMoved": 0, + "narrative": "The scheduled baseline project end date at Q2 1920 (30th September 2019) is 31/03/22, has changed since last year’s Q2 1819 date of 31/03/2021, due primarily to the following factors; \n\n - The programme has been extended until 31 March 2022 - funding has been confirmed by HM Treasury and Business Case updated. This will allow for further trial time for the projects. \n\n Since the Q2 1920 (30th September 2019) baseline project end date of 31/03/2022, the following non-project operating environment activities have impacted the original Q2 baseline project end date; \n\n - Programme end date of 2022 allowing for further benefits realisation within the Programme life cycle. This can help to provide a more informed decision for any further Government involvement in 5G activity/development. \n - The impacts of COVID-19 on the programme and its projects timelines, scope of work, and budgets is being regularly assessed and mitigations being put in place.\n\n Since the Q2 1920 (30th September 2019) baseline project end date of 31/03/2022, the following primary project actions have impacted the original Q2 baseline project end date; \n\n - Programme extended to allow further time for project trials. Slower initiation than anticipated has been a trend across the majority of projects; in some cases, this is due to equipment availability/cost savings.\n", + "label": "no-move", + "why": "Published end date unchanged (31 Mar 2021 in both releases). The narrative says the end date 'is 31/03/22, has changed since last year' and the programme 'has been extended until 31 March 2022'.", + "doubt": "The narrative states a move that the published dates do not show, so the column and the narrative disagree. The finish did not move, so this is no-move under ProjectLens's rule. The next release does show 31 Mar 2022.", + "matchedBy": "exact project name (case and punctuation normalised), unique in both releases", + "source": { + "current": { + "release": "IPA Annual Report 2019-20 (data as at 30 Sep 2019)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2020", + "csv": "https://assets.publishing.service.gov.uk/media/5f05de523a6f40041036a2ec/GMPP_Government_Major_Projects_Portfolio_data_September_2019.csv" + }, + "previous": { + "release": "IPA Annual Report 2018-19 (data as at 30 Sep 2018)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2019", + "csv": "https://assets.publishing.service.gov.uk/media/5d2dd08d40f0b64a8626b762/Annual_Report_on_Major_Projects_2018_to_2019__consolidated_data_and_narratives.csv" + } + } + }, + { + "id": "PLH2-B34", + "gmppId": "MOJ_0038_1718-Q4", + "gmppIdSource": "published in this release", + "project": "HMCTS Facilities Management Reprocurement Project (FMRP)", + "department": "MoJ", + "prevYear": 2019, + "year": 2020, + "prevRelease": "2018-19", + "release": "2019-20", + "prevEnd": "2019-12-31", + "curEnd": "2019-12-31", + "prevEndAsPublished": "31/12/2019", + "curEndAsPublished": "31/12/2019", + "daysMoved": 0, + "narrative": "The scheduled baseline project end date at Q2 1920 (30th September 2019) is 31/12/19, has not changed since last year's Q2 1819 date of 31/12/19, due primarily to the following factors;\n\n - The Project end was revised to 30th May 2020 in September 2019 however due to the timing of the reporting cycle this was not reflected in the return. The end date for the project is now July 2020.\n - The Procurement stage of the Project took longer than planned resulting in the requirement to revised the Project end date.\n\n Since the Q2 1920 (30th September 2019) baseline project end date of 31/12/19, the following primary project actions have impacted the original Q2 baseline project end date;\n\n - The Procurement stage of the Project took longer than planned resulting in the requirement to revised the Project end date.\n", + "label": "no-move", + "why": "Published end date unchanged (31 Dec 2019). The template says it 'has not changed', but the text says the end was revised to 30 May 2020 and 'is now July 2020'.", + "doubt": "As above: the narrative states a later date than the column.", + "prevDepartment": "MOJ", + "matchedBy": "exact project name (case and punctuation normalised), unique in both releases", + "source": { + "current": { + "release": "IPA Annual Report 2019-20 (data as at 30 Sep 2019)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2020", + "csv": "https://assets.publishing.service.gov.uk/media/5f05de523a6f40041036a2ec/GMPP_Government_Major_Projects_Portfolio_data_September_2019.csv" + }, + "previous": { + "release": "IPA Annual Report 2018-19 (data as at 30 Sep 2018)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2019", + "csv": "https://assets.publishing.service.gov.uk/media/5d2dd08d40f0b64a8626b762/Annual_Report_on_Major_Projects_2018_to_2019__consolidated_data_and_narratives.csv" + } + } + }, + { + "id": "PLH2-B35", + "gmppId": "BIS_0015_1516-Q1", + "gmppIdSource": "published in this release", + "project": "Local Land Charges (LLC) Programme", + "department": "BEIS", + "prevYear": 2019, + "year": 2020, + "prevRelease": "2018-19", + "release": "2019-20", + "prevEnd": "2023-11-17", + "curEnd": "2023-11-17", + "prevEndAsPublished": "17/11/2023", + "curEndAsPublished": "17/11/2023", + "daysMoved": 0, + "narrative": "The scheduled baseline project end date at Q2 1920 (30th September 2019) is 17/11/23, has not changed since last year's Q2 1819 date of 17/11/23, due primarily to the following factors;\n\n - The current business case proposes extending Phase 1 for another year to put in place and test the delivery model. This will enable a more informed business case and delivery timeline to be developed. \n - The Programme is dependent on local authorities signing up for data analysis and migration. The refreshed pre-migration and early engagement strategies are designed to bring more LAs forward quicker.\n - Given the significant time to migrate an individual LA and the number of LAs, this Programme is likely to be a multi-year programme.\n\n Since the Q2 1920 (30th September 2019) baseline project end date of 17/11/23, the following non-project operating environment activities have impacted the original Q2 baseline project end date;\n\n - There is a reliance on local authorities (and/or their software suppliers) to be engaged and able to extract data from their current system, to feed into the early data analysis work.\n - This programme has a significant dependency on the LAs existing software suppliers to extract the data and transfer it to HMLR systems for analysis. As approval for the Programme is currently on an annual basis, suppliers are reluctant to investment in their systems to create more strategic and streamlined solutions.\n\n Since the Q2 1920 (30th September 2019) baseline project end date of 17/11/23, the following primary project actions have impacted the original Q2 baseline project end date;\n\n - Machine learning analytic tools, such as the Migration Helper, is already proving to reduce migration timelines, particularly for improving spatial data.\n - New delivery models have been designed to enable several local authorities to migrate concurrently and with more appropriate support. The engagement strategy, commercial strategy and internal team capabilities have been redesigned to align with this and speed up delivery.\n", + "label": "no-move", + "why": "Published end date unchanged (17 Nov 2023). The narrative says it 'has not changed' while the business case proposes extending Phase 1.", + "matchedBy": "exact project name (case and punctuation normalised), unique in both releases", + "source": { + "current": { + "release": "IPA Annual Report 2019-20 (data as at 30 Sep 2019)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2020", + "csv": "https://assets.publishing.service.gov.uk/media/5f05de523a6f40041036a2ec/GMPP_Government_Major_Projects_Portfolio_data_September_2019.csv" + }, + "previous": { + "release": "IPA Annual Report 2018-19 (data as at 30 Sep 2018)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2019", + "csv": "https://assets.publishing.service.gov.uk/media/5d2dd08d40f0b64a8626b762/Annual_Report_on_Major_Projects_2018_to_2019__consolidated_data_and_narratives.csv" + } + } + } + ] +} \ No newline at end of file diff --git a/bench/real-cases/projectlens-heldout3.json b/bench/real-cases/projectlens-heldout3.json new file mode 100644 index 0000000..76ff698 --- /dev/null +++ b/bench/real-cases/projectlens-heldout3.json @@ -0,0 +1,1184 @@ +{ + "meta": { + "description": "Third held-out GMPP set for ProjectLens (2013-14 -> 2014-15, 2014-15 -> 2015-16, 2015-16 -> 2016-17, plus one 2020-21 -> 2021-22 pair). Not for tuning.", + "yearConvention": "year N = the release labelled (N-1)-N. Releases up to 2019-20 report data as at 30 September of year N-1; 2020-21 onwards as at 31 March of year N.", + "labelRules": { + "contradiction": "end date moved >14 days and the narrative says unchanged/the same/on track/on schedule, or names a current end date >14 days from the published one, without stating the actual move", + "explained": "end date moved >14 days and the narrative states the change (or the delay/reset that caused it)", + "no-move": "published end date identical in both releases (daysMoved = 0) and the narrative does not name a different current end date", + "published-date-check": "published end date identical in both releases, but the narrative names a current end date >14 days from the published one" + }, + "contradictionTypes": { + "claims-unchanged": "unchanged / remain unchanged / no deviation / will not impact the end date", + "claims-on-track": "'on track' / 'on schedule' / 'in line with plan' with no move stated", + "names-different-date": "names a current end date >14 days from the published one" + }, + "matching": "Releases before 2019-20 publish no GMPP ID. Pairs are joined on the exact project name after lower-casing and stripping punctuation, only when unique in both releases. The one 2021-22 pair is joined on GMPP ID.", + "narrativeVerbatim": "Exact cell text from the current-release CSV, including line breaks.", + "licence": "Contains public sector information licensed under the Open Government Licence v3.0." + }, + "cases": [ + { + "id": "PLH3-B01", + "gmppId": null, + "gmppIdSource": null, + "project": "Electoral Registration Transformation Programme", + "department": "CO", + "prevYear": 2014, + "year": 2015, + "prevRelease": "2013-14", + "release": "2014-15", + "prevEnd": "2016-01-01", + "curEnd": "2016-03-31", + "prevEndAsPublished": "01/01/2016", + "curEndAsPublished": "31/03/2016", + "daysMoved": 90, + "narrative": "During this period some individual minor milestones have deviated slightly from the original schedule, but the programme's critical milestones, overall timescale and original delivery dates remain on track.", + "label": "contradiction", + "why": "End date moved 90 days later (1 Jan 2016 -> 31 Mar 2016). The narrative says the programme's 'overall timescale and original delivery dates remain on track'. It admits only minor milestone deviations and states no end-date move.", + "contradictionType": "claims-unchanged", + "matchedBy": "exact project name (case and punctuation normalised), unique in both releases", + "source": { + "current": { + "release": "MPA Annual Report 2014-15 (data as at 30 Sep 2014)", + "publication": "https://www.gov.uk/government/publications/major-projects-authority-annual-report-2015", + "csv": "https://assets.publishing.service.gov.uk/media/5a801db6ed915d74e33f88a0/GMPP_data_september_2014.csv" + }, + "previous": { + "release": "MPA Annual Report 2013-14 (data as at 30 Sep 2013)", + "publication": "https://www.gov.uk/government/publications/major-projects-authority-annual-report-2014", + "csv": "https://assets.publishing.service.gov.uk/media/5a7ea47a40f0b62305b823ee/Government_Major_Projects_Portfolio_data__September_2013__CSV_.csv" + } + } + }, + { + "id": "PLH3-B02", + "gmppId": null, + "gmppIdSource": null, + "project": "National Citizen Service", + "department": "CO", + "prevYear": 2014, + "year": 2015, + "prevRelease": "2013-14", + "release": "2014-15", + "prevEnd": "2014-12-31", + "curEnd": "2015-03-01", + "prevEndAsPublished": "31/12/2014", + "curEndAsPublished": "01/03/2015", + "daysMoved": 60, + "narrative": "NCS has continued to be delivered on schedule.", + "label": "contradiction", + "why": "End date moved 60 days later (31 Dec 2014 -> 1 Mar 2015). The whole narrative is 'NCS has continued to be delivered on schedule.'", + "contradictionType": "claims-on-track", + "matchedBy": "exact project name (case and punctuation normalised), unique in both releases", + "source": { + "current": { + "release": "MPA Annual Report 2014-15 (data as at 30 Sep 2014)", + "publication": "https://www.gov.uk/government/publications/major-projects-authority-annual-report-2015", + "csv": "https://assets.publishing.service.gov.uk/media/5a801db6ed915d74e33f88a0/GMPP_data_september_2014.csv" + }, + "previous": { + "release": "MPA Annual Report 2013-14 (data as at 30 Sep 2013)", + "publication": "https://www.gov.uk/government/publications/major-projects-authority-annual-report-2014", + "csv": "https://assets.publishing.service.gov.uk/media/5a7ea47a40f0b62305b823ee/Government_Major_Projects_Portfolio_data__September_2013__CSV_.csv" + } + } + }, + { + "id": "PLH3-B03", + "gmppId": null, + "gmppIdSource": null, + "project": "Thames Tideway Tunnel", + "department": "DEFRA", + "prevYear": 2014, + "year": 2015, + "prevRelease": "2013-14", + "release": "2014-15", + "prevEnd": "2023-03-31", + "curEnd": "2023-12-31", + "prevEndAsPublished": "31/03/2023", + "curEndAsPublished": "31/12/2023", + "daysMoved": 275, + "narrative": "Project delivery is currently on schedule.", + "label": "contradiction", + "why": "End date moved 275 days later (31 Mar 2023 -> 31 Dec 2023). The whole narrative is 'Project delivery is currently on schedule.'", + "contradictionType": "claims-on-track", + "matchedBy": "exact project name (case and punctuation normalised), unique in both releases", + "source": { + "current": { + "release": "MPA Annual Report 2014-15 (data as at 30 Sep 2014)", + "publication": "https://www.gov.uk/government/publications/major-projects-authority-annual-report-2015", + "csv": "https://assets.publishing.service.gov.uk/media/5a801db6ed915d74e33f88a0/GMPP_data_september_2014.csv" + }, + "previous": { + "release": "MPA Annual Report 2013-14 (data as at 30 Sep 2013)", + "publication": "https://www.gov.uk/government/publications/major-projects-authority-annual-report-2014", + "csv": "https://assets.publishing.service.gov.uk/media/5a7ea47a40f0b62305b823ee/Government_Major_Projects_Portfolio_data__September_2013__CSV_.csv" + } + } + }, + { + "id": "PLH3-B04", + "gmppId": null, + "gmppIdSource": null, + "project": "Future Reserves 2020", + "department": "MoD", + "prevYear": 2014, + "year": 2015, + "prevRelease": "2013-14", + "release": "2014-15", + "prevEnd": "2018-03-31", + "curEnd": "2019-03-31", + "prevEndAsPublished": "31/03/2018", + "curEndAsPublished": "31/03/2019", + "daysMoved": 365, + "narrative": "The Programme remains on schedule to realise its benefits", + "label": "contradiction", + "why": "End date moved 365 days later (31 Mar 2018 -> 31 Mar 2019). The whole narrative is 'The Programme remains on schedule to realise its benefits'.", + "contradictionType": "claims-on-track", + "doubt": "The 'on schedule' claim is framed around benefits, not the end date.", + "prevDepartment": "MOD", + "matchedBy": "exact project name (case and punctuation normalised), unique in both releases", + "source": { + "current": { + "release": "MPA Annual Report 2014-15 (data as at 30 Sep 2014)", + "publication": "https://www.gov.uk/government/publications/major-projects-authority-annual-report-2015", + "csv": "https://assets.publishing.service.gov.uk/media/5a801db6ed915d74e33f88a0/GMPP_data_september_2014.csv" + }, + "previous": { + "release": "MPA Annual Report 2013-14 (data as at 30 Sep 2013)", + "publication": "https://www.gov.uk/government/publications/major-projects-authority-annual-report-2014", + "csv": "https://assets.publishing.service.gov.uk/media/5a7ea47a40f0b62305b823ee/Government_Major_Projects_Portfolio_data__September_2013__CSV_.csv" + } + } + }, + { + "id": "PLH3-B05", + "gmppId": null, + "gmppIdSource": null, + "project": "Future IT Sourcing Programme (FITS)", + "department": "MoJ", + "prevYear": 2014, + "year": 2015, + "prevRelease": "2013-14", + "release": "2014-15", + "prevEnd": "2016-04-01", + "curEnd": "2016-09-01", + "prevEndAsPublished": "01/04/2016", + "curEndAsPublished": "01/09/2016", + "daysMoved": 153, + "narrative": "The FITS Programme is moving from its procurement phase into delivery in line with the approved plan.", + "label": "contradiction", + "why": "End date moved 153 days later (1 Apr 2016 -> 1 Sep 2016). The narrative says the programme is moving into delivery 'in line with the approved plan'. It states no move.", + "contradictionType": "claims-on-track", + "doubt": "'In line with the approved plan' is a softer stability claim than 'unchanged'.", + "matchedBy": "exact project name (case and punctuation normalised), unique in both releases", + "source": { + "current": { + "release": "MPA Annual Report 2014-15 (data as at 30 Sep 2014)", + "publication": "https://www.gov.uk/government/publications/major-projects-authority-annual-report-2015", + "csv": "https://assets.publishing.service.gov.uk/media/5a801db6ed915d74e33f88a0/GMPP_data_september_2014.csv" + }, + "previous": { + "release": "MPA Annual Report 2013-14 (data as at 30 Sep 2013)", + "publication": "https://www.gov.uk/government/publications/major-projects-authority-annual-report-2014", + "csv": "https://assets.publishing.service.gov.uk/media/5a7ea47a40f0b62305b823ee/Government_Major_Projects_Portfolio_data__September_2013__CSV_.csv" + } + } + }, + { + "id": "PLH3-B06", + "gmppId": "DECC_0013_1213-Q1", + "gmppIdSource": "from the 2019-20 release, same project name", + "project": "Magnox & RSRL PBO Competition", + "department": "DECC", + "prevYear": 2015, + "year": 2016, + "prevRelease": "2014-15", + "release": "2015-16", + "prevEnd": "2028-03-01", + "curEnd": "2028-09-01", + "prevEndAsPublished": "01/03/2028", + "curEndAsPublished": "01/09/2028", + "daysMoved": 184, + "narrative": "The date for completing the current Consolidation Phase has been extended to accomodate addtional scope compared to the March 2013 postion which was the basis for the bid. However, this will not impact on the project end date. ", + "label": "contradiction", + "why": "End date moved 184 days later (1 Mar 2028 -> 1 Sep 2028). The narrative says the Consolidation Phase was extended but 'this will not impact on the project end date'.", + "contradictionType": "claims-unchanged", + "matchedBy": "exact project name (case and punctuation normalised), unique in both releases", + "source": { + "current": { + "release": "IPA Annual Report 2015-16 (data as at 30 Sep 2015)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2016", + "csv": "https://assets.publishing.service.gov.uk/media/5a80a49ce5274a2e8ab51547/government_major_projects_portfolio_data_september_2015.csv" + }, + "previous": { + "release": "MPA Annual Report 2014-15 (data as at 30 Sep 2014)", + "publication": "https://www.gov.uk/government/publications/major-projects-authority-annual-report-2015", + "csv": "https://assets.publishing.service.gov.uk/media/5a801db6ed915d74e33f88a0/GMPP_data_september_2014.csv" + } + } + }, + { + "id": "PLH3-B07", + "gmppId": null, + "gmppIdSource": null, + "project": "National Pandemic Flu Service", + "department": "DOH", + "prevYear": 2015, + "year": 2016, + "prevRelease": "2014-15", + "release": "2015-16", + "prevEnd": "2015-12-01", + "curEnd": "2016-10-30", + "prevEndAsPublished": "01/12/2015", + "curEndAsPublished": "30/10/2016", + "daysMoved": 334, + "narrative": "Phase 1, the replacement of the existing on-line service, remains on track for delivery on 1st December 2015.\nPhase 2, the replacement of the associated back office services, remains scheduled for September 2016.", + "label": "contradiction", + "why": "End date moved 334 days later (1 Dec 2015 -> 30 Oct 2016). The narrative says Phase 1 'remains on track for delivery on 1st December 2015' and Phase 2, the last phase, 'remains scheduled for September 2016'. Both are stated as unchanged, and September 2016 is 30+ days before the published 30 Oct 2016.", + "contradictionType": "names-different-date", + "doubt": "The narrative gives phase dates, not an explicit project end date.", + "prevDepartment": "DoH Non Capital", + "matchedBy": "exact project name (case and punctuation normalised), unique in both releases", + "source": { + "current": { + "release": "IPA Annual Report 2015-16 (data as at 30 Sep 2015)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2016", + "csv": "https://assets.publishing.service.gov.uk/media/5a80a49ce5274a2e8ab51547/government_major_projects_portfolio_data_september_2015.csv" + }, + "previous": { + "release": "MPA Annual Report 2014-15 (data as at 30 Sep 2014)", + "publication": "https://www.gov.uk/government/publications/major-projects-authority-annual-report-2015", + "csv": "https://assets.publishing.service.gov.uk/media/5a801db6ed915d74e33f88a0/GMPP_data_september_2014.csv" + } + } + }, + { + "id": "PLH3-B08", + "gmppId": null, + "gmppIdSource": null, + "project": "ABUJA New Office and Residence", + "department": "FCO", + "prevYear": 2016, + "year": 2017, + "prevRelease": "2015-16", + "release": "2016-17", + "prevEnd": "2016-12-01", + "curEnd": "2017-12-01", + "prevEndAsPublished": "01/12/2016", + "curEndAsPublished": "01/12/2017", + "daysMoved": 365, + "narrative": "On schedule", + "label": "contradiction", + "why": "End date moved 365 days later (1 Dec 2016 -> 1 Dec 2017). The whole narrative is 'On schedule'.", + "contradictionType": "claims-on-track", + "matchedBy": "exact project name (case and punctuation normalised), unique in both releases", + "source": { + "current": { + "release": "IPA Annual Report 2016-17 (data as at 30 Sep 2016)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2017", + "csv": "https://assets.publishing.service.gov.uk/media/5a821ed6e5274a2e8ab57995/Annual_Report_-_consolidated_data_and_narratives.csv" + }, + "previous": { + "release": "IPA Annual Report 2015-16 (data as at 30 Sep 2015)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2016", + "csv": "https://assets.publishing.service.gov.uk/media/5a80a49ce5274a2e8ab51547/government_major_projects_portfolio_data_september_2015.csv" + } + } + }, + { + "id": "PLH3-B09", + "gmppId": null, + "gmppIdSource": null, + "project": "Priority School Building Programme - Private Finance", + "department": "DfE", + "prevYear": 2016, + "year": 2017, + "prevRelease": "2015-16", + "release": "2016-17", + "prevEnd": "2018-04-01", + "curEnd": "2043-07-01", + "prevEndAsPublished": "01/04/2018", + "curEndAsPublished": "01/07/2043", + "daysMoved": 9222, + "narrative": "No deviation from planned schedule", + "label": "contradiction", + "why": "End date moved 9,222 days later (1 Apr 2018 -> 1 Jul 2043). The whole narrative is 'No deviation from planned schedule'.", + "contradictionType": "claims-unchanged", + "doubt": "The new date (2043) looks like a PF contract term rather than a delivery date, which may explain the jump. The narrative still says nothing moved.", + "prevDepartment": "DFE", + "matchedBy": "exact project name (case and punctuation normalised), unique in both releases", + "source": { + "current": { + "release": "IPA Annual Report 2016-17 (data as at 30 Sep 2016)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2017", + "csv": "https://assets.publishing.service.gov.uk/media/5a821ed6e5274a2e8ab57995/Annual_Report_-_consolidated_data_and_narratives.csv" + }, + "previous": { + "release": "IPA Annual Report 2015-16 (data as at 30 Sep 2015)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2016", + "csv": "https://assets.publishing.service.gov.uk/media/5a80a49ce5274a2e8ab51547/government_major_projects_portfolio_data_september_2015.csv" + } + } + }, + { + "id": "PLH3-B10", + "gmppId": "DFT_0016_1112-Q1", + "gmppIdSource": "from the 2019-20 release, same project name", + "project": "Thameslink Programme", + "department": "DfT", + "prevYear": 2016, + "year": 2017, + "prevRelease": "2015-16", + "release": "2016-17", + "prevEnd": "2018-12-31", + "curEnd": "2026-12-31", + "prevEndAsPublished": "31/12/2018", + "curEndAsPublished": "31/12/2026", + "daysMoved": 2922, + "narrative": "The Thameslink Programme is a circa £7bn project which will increase capacity and improve accessibility to, from and through the heart of London. The programme remains on schedule for completion in December 2018. Although good progress has been made on train delivery, infrastructure works at London Bridge station and the construction of two new depots, there remains a number of challenges relating to the delivery of the new timetable into service in December 2018 which includes agreeing the timetable, rolling stock acceptance testing and operational readiness. The IPA RAG rating for the programme remains unchanged from Q1 at Amber/Green\n\nThe implenteation of a new corss industry delivery board and idnepenedent process is design to imporve readiness for 2018. ", + "label": "contradiction", + "why": "End date moved 2,922 days later (31 Dec 2018 -> 31 Dec 2026). The narrative says 'The programme remains on schedule for completion in December 2018'. That is the previous date, 8 years before the published one.", + "contradictionType": "names-different-date", + "doubt": "The 2026 date may include a later phase or contract period.", + "prevDepartment": "DFT", + "matchedBy": "exact project name (case and punctuation normalised), unique in both releases", + "source": { + "current": { + "release": "IPA Annual Report 2016-17 (data as at 30 Sep 2016)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2017", + "csv": "https://assets.publishing.service.gov.uk/media/5a821ed6e5274a2e8ab57995/Annual_Report_-_consolidated_data_and_narratives.csv" + }, + "previous": { + "release": "IPA Annual Report 2015-16 (data as at 30 Sep 2015)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2016", + "csv": "https://assets.publishing.service.gov.uk/media/5a80a49ce5274a2e8ab51547/government_major_projects_portfolio_data_september_2015.csv" + } + } + }, + { + "id": "PLH3-B11", + "gmppId": null, + "gmppIdSource": null, + "project": "CSC Local Service Provider (LSP) Delivery Programme", + "department": "DH", + "prevYear": 2016, + "year": 2017, + "prevRelease": "2015-16", + "release": "2016-17", + "prevEnd": "2023-03-31", + "curEnd": "2017-12-31", + "prevEndAsPublished": "31/03/2023", + "curEndAsPublished": "31/12/2017", + "daysMoved": -1916, + "narrative": "The majority of the non-Lorenzo system deployed under the CSC LSP Contract sucessfully exited the contract in July 2016.\nThe remaining Lorenzo deployments are on target, with final deployments occuring in 2017 and the overall programme on target to end in 2022.", + "label": "contradiction", + "why": "End date moved 1,916 days earlier (31 Mar 2023 -> 31 Dec 2017). The narrative says 'the overall programme on target to end in 2022'. That is about 4 years after the published current date. It states no move.", + "contradictionType": "names-different-date", + "prevDepartment": "DOH", + "matchedBy": "exact project name (case and punctuation normalised), unique in both releases", + "source": { + "current": { + "release": "IPA Annual Report 2016-17 (data as at 30 Sep 2016)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2017", + "csv": "https://assets.publishing.service.gov.uk/media/5a821ed6e5274a2e8ab57995/Annual_Report_-_consolidated_data_and_narratives.csv" + }, + "previous": { + "release": "IPA Annual Report 2015-16 (data as at 30 Sep 2015)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2016", + "csv": "https://assets.publishing.service.gov.uk/media/5a80a49ce5274a2e8ab51547/government_major_projects_portfolio_data_september_2015.csv" + } + } + }, + { + "id": "PLH3-B12", + "gmppId": "MOD_0017_1112-Q1", + "gmppIdSource": "from the 2019-20 release, same project name", + "project": "Crowsnest Programme", + "department": "MoD", + "prevYear": 2016, + "year": 2017, + "prevRelease": "2015-16", + "release": "2016-17", + "prevEnd": "2022-09-30", + "curEnd": "2023-06-30", + "prevEndAsPublished": "30/09/2022", + "curEndAsPublished": "30/06/2023", + "daysMoved": 273, + "narrative": "Key programme milestones remain unchanged.", + "label": "contradiction", + "why": "End date moved 273 days later (30 Sep 2022 -> 30 Jun 2023). The whole narrative is 'Key programme milestones remain unchanged.'", + "contradictionType": "claims-unchanged", + "doubt": "The claim is about milestones; the previous release used the same sentence when the date did not move.", + "prevDepartment": "MOD", + "matchedBy": "exact project name (case and punctuation normalised), unique in both releases", + "source": { + "current": { + "release": "IPA Annual Report 2016-17 (data as at 30 Sep 2016)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2017", + "csv": "https://assets.publishing.service.gov.uk/media/5a821ed6e5274a2e8ab57995/Annual_Report_-_consolidated_data_and_narratives.csv" + }, + "previous": { + "release": "IPA Annual Report 2015-16 (data as at 30 Sep 2015)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2016", + "csv": "https://assets.publishing.service.gov.uk/media/5a80a49ce5274a2e8ab51547/government_major_projects_portfolio_data_september_2015.csv" + } + } + }, + { + "id": "PLH3-B13", + "gmppId": null, + "gmppIdSource": null, + "project": "North Wales Prison (NWP ) Programme", + "department": "MoJ", + "prevYear": 2016, + "year": 2017, + "prevRelease": "2015-16", + "release": "2016-17", + "prevEnd": "2018-03-31", + "curEnd": "2018-05-31", + "prevEndAsPublished": "31/03/2018", + "curEndAsPublished": "31/05/2018", + "daysMoved": 61, + "narrative": "The project remains on schedule. The first of 2,106 places opened on 27 February.", + "label": "contradiction", + "why": "End date moved 61 days later (31 Mar 2018 -> 31 May 2018). The narrative says 'The project remains on schedule.'", + "contradictionType": "claims-on-track", + "matchedBy": "exact project name (case and punctuation normalised), unique in both releases", + "source": { + "current": { + "release": "IPA Annual Report 2016-17 (data as at 30 Sep 2016)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2017", + "csv": "https://assets.publishing.service.gov.uk/media/5a821ed6e5274a2e8ab57995/Annual_Report_-_consolidated_data_and_narratives.csv" + }, + "previous": { + "release": "IPA Annual Report 2015-16 (data as at 30 Sep 2015)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2016", + "csv": "https://assets.publishing.service.gov.uk/media/5a80a49ce5274a2e8ab51547/government_major_projects_portfolio_data_september_2015.csv" + } + } + }, + { + "id": "PLH3-B14", + "gmppId": null, + "gmppIdSource": null, + "project": "NHSmail2", + "department": "DoH Non Capital", + "prevYear": 2014, + "year": 2015, + "prevRelease": "2013-14", + "release": "2014-15", + "prevEnd": "2014-11-18", + "curEnd": "2016-06-30", + "prevEndAsPublished": "18/11/2014", + "curEndAsPublished": "30/06/2016", + "daysMoved": 590, + "narrative": "The NHSmail 2 Outline Business Case outlined that the service would be procured from the Crown Commercial Service Managed Email framework that was under procurement. The award of the framework was delayed, resulting in a critical path delay to the NHSmail 2 project. As of January 2015, the Managed Email framework has been awarded and contains 5 suppliers. The NHSmail 2 project is in its final stages of procurement. The impact of the delay has been to delay the contract award and subsequent delivery of NHSmail 2. During the delay period the NHSmail 1 service has continued and has provided benefits, meaning that whilst this is a time delay benefits have not been lost.", + "label": "explained", + "why": "Moved 590 days later. The narrative says the framework award 'was delayed, resulting in a critical path delay', and the delay pushed back contract award and delivery.", + "prevDepartment": "DoH", + "matchedBy": "exact project name (case and punctuation normalised), unique in both releases", + "source": { + "current": { + "release": "MPA Annual Report 2014-15 (data as at 30 Sep 2014)", + "publication": "https://www.gov.uk/government/publications/major-projects-authority-annual-report-2015", + "csv": "https://assets.publishing.service.gov.uk/media/5a801db6ed915d74e33f88a0/GMPP_data_september_2014.csv" + }, + "previous": { + "release": "MPA Annual Report 2013-14 (data as at 30 Sep 2013)", + "publication": "https://www.gov.uk/government/publications/major-projects-authority-annual-report-2014", + "csv": "https://assets.publishing.service.gov.uk/media/5a7ea47a40f0b62305b823ee/Government_Major_Projects_Portfolio_data__September_2013__CSV_.csv" + } + } + }, + { + "id": "PLH3-B15", + "gmppId": null, + "gmppIdSource": null, + "project": "Equitable Life Payment Scheme", + "department": "HMT", + "prevYear": 2014, + "year": 2015, + "prevRelease": "2013-14", + "release": "2014-15", + "prevEnd": "2014-07-01", + "curEnd": "2015-12-31", + "prevEndAsPublished": "01/07/2014", + "curEndAsPublished": "31/12/2015", + "daysMoved": 548, + "narrative": "In October 2013 the Treasury announced the Chancellor’s decision to extend the timing of the closure of the Scheme to 2015. The emphasis on delivering payments remains unchanged and everything has been done to maintain the momentum to deliver as many payments as possible before the Scheme closes. The Treasury has been working with NS&I to revise the programme milestones in the light of the extension. ", + "label": "explained", + "why": "Moved 548 days later (to 31 Dec 2015). The narrative says the Chancellor decided 'to extend the timing of the closure of the Scheme to 2015'. 'Remains unchanged' refers to the emphasis on payments.", + "doubt": "Contains 'remains unchanged' about something else.", + "matchedBy": "exact project name (case and punctuation normalised), unique in both releases", + "source": { + "current": { + "release": "MPA Annual Report 2014-15 (data as at 30 Sep 2014)", + "publication": "https://www.gov.uk/government/publications/major-projects-authority-annual-report-2015", + "csv": "https://assets.publishing.service.gov.uk/media/5a801db6ed915d74e33f88a0/GMPP_data_september_2014.csv" + }, + "previous": { + "release": "MPA Annual Report 2013-14 (data as at 30 Sep 2013)", + "publication": "https://www.gov.uk/government/publications/major-projects-authority-annual-report-2014", + "csv": "https://assets.publishing.service.gov.uk/media/5a7ea47a40f0b62305b823ee/Government_Major_Projects_Portfolio_data__September_2013__CSV_.csv" + } + } + }, + { + "id": "PLH3-B16", + "gmppId": "MOD_0061_1112-Q1", + "gmppIdSource": "from the 2019-20 release, same project name", + "project": "WATCHKEEPER", + "department": "MoD", + "prevYear": 2014, + "year": 2015, + "prevRelease": "2013-14", + "release": "2014-15", + "prevEnd": "2040-12-31", + "curEnd": "2042-12-31", + "prevEndAsPublished": "31/12/2040", + "curEndAsPublished": "31/12/2042", + "daysMoved": 730, + "narrative": "The programme was re-baselined in June 2014. The first major milestone (Initial Operating Capability) was achieved by deploying the capability to Afghanistan in August 2014 at the Operational Capability Unit (OCU) standard. The next milestone is to generate additional capacity of 4 Task Lines (at the OCU standard) in April 2016. The main effort is to achieve Full Operating Capability (FOC) Apr-Jul 17 with an uplift of the capability to Equipment Standard 2 (ES2). This will require a major Release to Service (RTS) amendment. The programme remains on track to achieve these milestones. Achieving programme milestones remains challenging but the re-balancing process has delivered a taut and achievable timeline. ", + "label": "explained", + "why": "Moved 730 days later. The narrative opens 'The programme was re-baselined in June 2014'. 'Remains on track' refers to the re-baselined milestones.", + "doubt": "It states the re-baseline but not the new end date.", + "prevDepartment": "MOD", + "matchedBy": "exact project name (case and punctuation normalised), unique in both releases", + "source": { + "current": { + "release": "MPA Annual Report 2014-15 (data as at 30 Sep 2014)", + "publication": "https://www.gov.uk/government/publications/major-projects-authority-annual-report-2015", + "csv": "https://assets.publishing.service.gov.uk/media/5a801db6ed915d74e33f88a0/GMPP_data_september_2014.csv" + }, + "previous": { + "release": "MPA Annual Report 2013-14 (data as at 30 Sep 2013)", + "publication": "https://www.gov.uk/government/publications/major-projects-authority-annual-report-2014", + "csv": "https://assets.publishing.service.gov.uk/media/5a7ea47a40f0b62305b823ee/Government_Major_Projects_Portfolio_data__September_2013__CSV_.csv" + } + } + }, + { + "id": "PLH3-B17", + "gmppId": null, + "gmppIdSource": null, + "project": "CHINOOK (incl. Project Julius)", + "department": "MOD", + "prevYear": 2015, + "year": 2016, + "prevRelease": "2014-15", + "release": "2015-16", + "prevEnd": "2017-03-31", + "curEnd": "2017-06-30", + "prevEndAsPublished": "31/03/2017", + "curEndAsPublished": "30/06/2017", + "daysMoved": 91, + "narrative": "The Programme remains on schedule to achieve NEW BUY Full Operating Capability in March 2017. The Programme was previously scheduled to complete by 31 March 2017, but this would not have allowed sufficient time to complete the final activities necessary to enable full realisation of benefits and to learn from the experience of the Programme. Approval has therefore been gained to delay the Programme Closure date until 30 June 2017.", + "label": "explained", + "why": "Moved 91 days later. The narrative says the programme 'was previously scheduled to complete by 31 March 2017' and 'Approval has therefore been gained to delay the Programme Closure date until 30 June 2017'. Both dates match the column.", + "prevProject": "CHINOOK (incl Project Julius)", + "prevDepartment": "MoD", + "matchedBy": "exact project name (case and punctuation normalised), unique in both releases", + "source": { + "current": { + "release": "IPA Annual Report 2015-16 (data as at 30 Sep 2015)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2016", + "csv": "https://assets.publishing.service.gov.uk/media/5a80a49ce5274a2e8ab51547/government_major_projects_portfolio_data_september_2015.csv" + }, + "previous": { + "release": "MPA Annual Report 2014-15 (data as at 30 Sep 2014)", + "publication": "https://www.gov.uk/government/publications/major-projects-authority-annual-report-2015", + "csv": "https://assets.publishing.service.gov.uk/media/5a801db6ed915d74e33f88a0/GMPP_data_september_2014.csv" + } + } + }, + { + "id": "PLH3-B18", + "gmppId": null, + "gmppIdSource": null, + "project": "Lightning II Programme", + "department": "MOD", + "prevYear": 2015, + "year": 2016, + "prevRelease": "2014-15", + "release": "2015-16", + "prevEnd": "2035-03-31", + "curEnd": "2026-03-31", + "prevEndAsPublished": "31/03/2035", + "curEndAsPublished": "31/03/2026", + "daysMoved": -3287, + "narrative": "Project End date has been amended to 2026 to reflect the point at which the currently planned follow-on development Block 4 weapons capability upgrades will be completed. The Programme remains on track to deliver UK Initial Operational Capability (IOC) by December 2018 and subsequently IOC (Maritime) and Full Operational Capability.", + "label": "explained", + "why": "Moved 3,287 days earlier (2035 -> 2026). The narrative says 'Project End date has been amended to 2026' and gives the reason.", + "prevDepartment": "MoD", + "matchedBy": "exact project name (case and punctuation normalised), unique in both releases", + "source": { + "current": { + "release": "IPA Annual Report 2015-16 (data as at 30 Sep 2015)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2016", + "csv": "https://assets.publishing.service.gov.uk/media/5a80a49ce5274a2e8ab51547/government_major_projects_portfolio_data_september_2015.csv" + }, + "previous": { + "release": "MPA Annual Report 2014-15 (data as at 30 Sep 2014)", + "publication": "https://www.gov.uk/government/publications/major-projects-authority-annual-report-2015", + "csv": "https://assets.publishing.service.gov.uk/media/5a801db6ed915d74e33f88a0/GMPP_data_september_2014.csv" + } + } + }, + { + "id": "PLH3-B19", + "gmppId": null, + "gmppIdSource": null, + "project": "Visitor and Migrant NHS Cost Recovery Programme", + "department": "DH", + "prevYear": 2016, + "year": 2017, + "prevRelease": "2015-16", + "release": "2016-17", + "prevEnd": "2017-03-31", + "curEnd": "2018-03-31", + "prevEndAsPublished": "31/03/2017", + "curEndAsPublished": "31/03/2018", + "daysMoved": 365, + "narrative": "In September 2016, the programme was extended to March 2018 to enable further opportunities to extend cost recovery. As a result of the EU exit decision, the programme will re-baseline its programme of work, associated milestones and risks, building on recommendations from assurance reviews conducted during 2016. The National Audit Office report (Autumn 2016) will also inform the future cost recovery programme of work.", + "label": "explained", + "why": "Moved 365 days later. The narrative says 'In September 2016, the programme was extended to March 2018'.", + "prevDepartment": "DOH", + "matchedBy": "exact project name (case and punctuation normalised), unique in both releases", + "source": { + "current": { + "release": "IPA Annual Report 2016-17 (data as at 30 Sep 2016)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2017", + "csv": "https://assets.publishing.service.gov.uk/media/5a821ed6e5274a2e8ab57995/Annual_Report_-_consolidated_data_and_narratives.csv" + }, + "previous": { + "release": "IPA Annual Report 2015-16 (data as at 30 Sep 2015)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2016", + "csv": "https://assets.publishing.service.gov.uk/media/5a80a49ce5274a2e8ab51547/government_major_projects_portfolio_data_september_2015.csv" + } + } + }, + { + "id": "PLH3-B20", + "gmppId": null, + "gmppIdSource": null, + "project": "Disclosure and Barring Service (DBS) Programme", + "department": "HO", + "prevYear": 2016, + "year": 2017, + "prevRelease": "2015-16", + "release": "2016-17", + "prevEnd": "2015-07-31", + "curEnd": "2017-12-31", + "prevEndAsPublished": "31/07/2015", + "curEndAsPublished": "31/12/2017", + "daysMoved": 884, + "narrative": "The project delivery date was revised to a 2017 implementation. Home Office and IPA are engaged and providing assitance - with delivery stakeholders and suppliers reviewing the revised plan. ", + "label": "explained", + "why": "Moved 884 days later. The narrative says 'The project delivery date was revised to a 2017 implementation'.", + "matchedBy": "exact project name (case and punctuation normalised), unique in both releases", + "source": { + "current": { + "release": "IPA Annual Report 2016-17 (data as at 30 Sep 2016)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2017", + "csv": "https://assets.publishing.service.gov.uk/media/5a821ed6e5274a2e8ab57995/Annual_Report_-_consolidated_data_and_narratives.csv" + }, + "previous": { + "release": "IPA Annual Report 2015-16 (data as at 30 Sep 2015)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2016", + "csv": "https://assets.publishing.service.gov.uk/media/5a80a49ce5274a2e8ab51547/government_major_projects_portfolio_data_september_2015.csv" + } + } + }, + { + "id": "PLH3-B21", + "gmppId": null, + "gmppIdSource": null, + "project": "Adelphi Modernisation Programme", + "department": "HO", + "prevYear": 2016, + "year": 2017, + "prevRelease": "2015-16", + "release": "2016-17", + "prevEnd": "2016-03-31", + "curEnd": "2019-06-01", + "prevEndAsPublished": "31/03/2016", + "curEndAsPublished": "01/06/2019", + "daysMoved": 1157, + "narrative": "Due to the reset of the business case. New implementation approaches and timescales were being explored as part of business case development. ", + "label": "explained", + "why": "Moved 1,157 days later. The narrative says the move is 'Due to the reset of the business case' and that new timescales were being explored.", + "doubt": "It states a reset, not the new date.", + "matchedBy": "exact project name (case and punctuation normalised), unique in both releases", + "source": { + "current": { + "release": "IPA Annual Report 2016-17 (data as at 30 Sep 2016)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2017", + "csv": "https://assets.publishing.service.gov.uk/media/5a821ed6e5274a2e8ab57995/Annual_Report_-_consolidated_data_and_narratives.csv" + }, + "previous": { + "release": "IPA Annual Report 2015-16 (data as at 30 Sep 2015)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2016", + "csv": "https://assets.publishing.service.gov.uk/media/5a80a49ce5274a2e8ab51547/government_major_projects_portfolio_data_september_2015.csv" + } + } + }, + { + "id": "PLH3-B22", + "gmppId": "HO_0032_1415-Q1", + "gmppIdSource": "from the 2019-20 release, same project name", + "project": "Technology Platforms for Tomorrow (TPT)", + "department": "HO", + "prevYear": 2016, + "year": 2017, + "prevRelease": "2015-16", + "release": "2016-17", + "prevEnd": "2016-09-01", + "curEnd": "2017-10-31", + "prevEndAsPublished": "01/09/2016", + "curEndAsPublished": "31/10/2017", + "daysMoved": 425, + "narrative": "The programme has negotiated a contract with the incumbent supplier to extend a subset of the services beyond the handover period to maintain services until the rollout of the new devices is complete. The programme is on track to deliver within this extension period (the contract has the option to extend the services to April 2018 if required)", + "label": "explained", + "why": "Moved 425 days later. The narrative says the programme negotiated 'to extend a subset of the services beyond the handover period' and is on track within this extension.", + "matchedBy": "exact project name (case and punctuation normalised), unique in both releases", + "source": { + "current": { + "release": "IPA Annual Report 2016-17 (data as at 30 Sep 2016)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2017", + "csv": "https://assets.publishing.service.gov.uk/media/5a821ed6e5274a2e8ab57995/Annual_Report_-_consolidated_data_and_narratives.csv" + }, + "previous": { + "release": "IPA Annual Report 2015-16 (data as at 30 Sep 2015)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2016", + "csv": "https://assets.publishing.service.gov.uk/media/5a80a49ce5274a2e8ab51547/government_major_projects_portfolio_data_september_2015.csv" + } + } + }, + { + "id": "PLH3-B23", + "gmppId": null, + "gmppIdSource": null, + "project": "Her Majesty's Courts and Tribunals Services (HMCTS) Reform Programme", + "department": "MoJ", + "prevYear": 2016, + "year": 2017, + "prevRelease": "2015-16", + "release": "2016-17", + "prevEnd": "2020-03-31", + "curEnd": "2022-03-31", + "prevEndAsPublished": "31/03/2020", + "curEndAsPublished": "31/03/2022", + "daysMoved": 730, + "narrative": "The whole programme is delivering well in its early phase and is now due to conclude at the end of March 2022, in line with the refreshed PBC approved by MPRG which moved delivery from a 4 year to a 6 year timeframe. \nWi-Fi is now installed in the CFT areas of 45 Combined Courts and work is underway to roll out enhanced WiFi and screens to all CFT courts. Early on-line applications for Divorce, probate and 'track my appeal' are moving to pilot stages. Rationalisation of HMCTS estate continues. At end January a total of 84 sites had ceased to provide customer facing services and 56 fully exited. \n ", + "label": "explained", + "why": "Moved 730 days later. The narrative says the programme 'is now due to conclude at the end of March 2022', after a refreshed business case moved delivery from 4 to 6 years. That matches the column.", + "matchedBy": "exact project name (case and punctuation normalised), unique in both releases", + "source": { + "current": { + "release": "IPA Annual Report 2016-17 (data as at 30 Sep 2016)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2017", + "csv": "https://assets.publishing.service.gov.uk/media/5a821ed6e5274a2e8ab57995/Annual_Report_-_consolidated_data_and_narratives.csv" + }, + "previous": { + "release": "IPA Annual Report 2015-16 (data as at 30 Sep 2015)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2016", + "csv": "https://assets.publishing.service.gov.uk/media/5a80a49ce5274a2e8ab51547/government_major_projects_portfolio_data_september_2015.csv" + } + } + }, + { + "id": "PLH3-B24", + "gmppId": null, + "gmppIdSource": null, + "project": "The Francis Crick Institute (formerly UKCMRI)", + "department": "BIS", + "prevYear": 2014, + "year": 2015, + "prevRelease": "2013-14", + "release": "2014-15", + "prevEnd": "2017-12-21", + "curEnd": "2017-12-21", + "prevEndAsPublished": "21/12/2017", + "curEndAsPublished": "21/12/2017", + "daysMoved": 0, + "narrative": "In conjunction with all JV partners it was agreed to extend the construction contract completion date to November 2015 to enable the Building Contractor to undertake science related accommodation changes. There was no adjustment to the project completion date. This was more economical than undergoing post completion works. The MRC funding requirements and construction budget for the Crick remains the same.", + "label": "no-move", + "why": "Published end date unchanged (21 Dec 2017). The narrative says the construction contract completion was extended to November 2015 but 'There was no adjustment to the project completion date'.", + "doubt": "False-positive test: an extension word about a sub-contract.", + "matchedBy": "exact project name (case and punctuation normalised), unique in both releases", + "source": { + "current": { + "release": "MPA Annual Report 2014-15 (data as at 30 Sep 2014)", + "publication": "https://www.gov.uk/government/publications/major-projects-authority-annual-report-2015", + "csv": "https://assets.publishing.service.gov.uk/media/5a801db6ed915d74e33f88a0/GMPP_data_september_2014.csv" + }, + "previous": { + "release": "MPA Annual Report 2013-14 (data as at 30 Sep 2013)", + "publication": "https://www.gov.uk/government/publications/major-projects-authority-annual-report-2014", + "csv": "https://assets.publishing.service.gov.uk/media/5a7ea47a40f0b62305b823ee/Government_Major_Projects_Portfolio_data__September_2013__CSV_.csv" + } + } + }, + { + "id": "PLH3-B25", + "gmppId": null, + "gmppIdSource": null, + "project": "Care and Support Implementation Programme", + "department": "DOH", + "prevYear": 2015, + "year": 2016, + "prevRelease": "2014-15", + "release": "2015-16", + "prevEnd": "2016-12-01", + "curEnd": "2016-12-01", + "prevEndAsPublished": "01/12/2016", + "curEndAsPublished": "01/12/2016", + "daysMoved": 0, + "narrative": "A decision has been made to delay implementation of Phase 2 of the reforms (the cap on care costs and the new appeals system) until April 2020, so they are now out of scope and will be taken forward by a new programme in due course.", + "label": "no-move", + "why": "Published end date unchanged (1 Dec 2016). The narrative says Phase 2 was delayed to April 2020 and is now out of scope for this programme.", + "doubt": "False-positive test: a delay that moved scope out, not the end date.", + "prevDepartment": "DoH Non Capital", + "matchedBy": "exact project name (case and punctuation normalised), unique in both releases", + "source": { + "current": { + "release": "IPA Annual Report 2015-16 (data as at 30 Sep 2015)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2016", + "csv": "https://assets.publishing.service.gov.uk/media/5a80a49ce5274a2e8ab51547/government_major_projects_portfolio_data_september_2015.csv" + }, + "previous": { + "release": "MPA Annual Report 2014-15 (data as at 30 Sep 2014)", + "publication": "https://www.gov.uk/government/publications/major-projects-authority-annual-report-2015", + "csv": "https://assets.publishing.service.gov.uk/media/5a801db6ed915d74e33f88a0/GMPP_data_september_2014.csv" + } + } + }, + { + "id": "PLH3-B26", + "gmppId": null, + "gmppIdSource": null, + "project": "NHS Procurement Efficiency Programme", + "department": "DOH", + "prevYear": 2015, + "year": 2016, + "prevRelease": "2014-15", + "release": "2015-16", + "prevEnd": "2016-03-31", + "curEnd": "2016-03-31", + "prevEndAsPublished": "31/03/2016", + "curEndAsPublished": "31/03/2016", + "daysMoved": 0, + "narrative": "As defined above, the project remains on track to deliver to schedule by the end of March 2016.", + "label": "no-move", + "why": "Published end date unchanged (31 Mar 2016). The narrative says the project 'remains on track to deliver to schedule by the end of March 2016', which matches.", + "prevDepartment": "DoH Non Capital", + "matchedBy": "exact project name (case and punctuation normalised), unique in both releases", + "source": { + "current": { + "release": "IPA Annual Report 2015-16 (data as at 30 Sep 2015)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2016", + "csv": "https://assets.publishing.service.gov.uk/media/5a80a49ce5274a2e8ab51547/government_major_projects_portfolio_data_september_2015.csv" + }, + "previous": { + "release": "MPA Annual Report 2014-15 (data as at 30 Sep 2014)", + "publication": "https://www.gov.uk/government/publications/major-projects-authority-annual-report-2015", + "csv": "https://assets.publishing.service.gov.uk/media/5a801db6ed915d74e33f88a0/GMPP_data_september_2014.csv" + } + } + }, + { + "id": "PLH3-B27", + "gmppId": "MOD_0047_1112-Q1", + "gmppIdSource": "from the 2019-20 release, same project name", + "project": "Spearfish Upgrade Programme", + "department": "MoD", + "prevYear": 2016, + "year": 2017, + "prevRelease": "2015-16", + "release": "2016-17", + "prevEnd": "2024-03-31", + "curEnd": "2024-03-31", + "prevEndAsPublished": "31/03/2024", + "curEndAsPublished": "31/03/2024", + "daysMoved": 0, + "narrative": "Project end date (delivery of all Mod kits) remains 31 March 2024. However, as mentioned in assessment of delivery confidence, the full realisation of the warfighting capability is dependent on the delivery of the Weapon Thread element (the platform connection from the weapon to the combat system). Although a representative from this parallel project now attends the SFU programme board, this work-stream is managed as a critical dependency and remains outwith the scope of the SFU project itself, which has limited influence over delivery timescale of that element.", + "label": "no-move", + "why": "Published end date unchanged (31 Mar 2024). The narrative says 'Project end date ... remains 31 March 2024', which matches.", + "prevDepartment": "MOD", + "matchedBy": "exact project name (case and punctuation normalised), unique in both releases", + "source": { + "current": { + "release": "IPA Annual Report 2016-17 (data as at 30 Sep 2016)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2017", + "csv": "https://assets.publishing.service.gov.uk/media/5a821ed6e5274a2e8ab57995/Annual_Report_-_consolidated_data_and_narratives.csv" + }, + "previous": { + "release": "IPA Annual Report 2015-16 (data as at 30 Sep 2015)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2016", + "csv": "https://assets.publishing.service.gov.uk/media/5a80a49ce5274a2e8ab51547/government_major_projects_portfolio_data_september_2015.csv" + } + } + }, + { + "id": "PLH3-B28", + "gmppId": null, + "gmppIdSource": null, + "project": "Thames Estuary Asset Management Programme (TEAM2100)", + "department": "DEFRA", + "prevYear": 2016, + "year": 2017, + "prevRelease": "2015-16", + "release": "2016-17", + "prevEnd": "2025-12-31", + "curEnd": "2025-12-31", + "prevEndAsPublished": "31/12/2025", + "curEndAsPublished": "31/12/2025", + "daysMoved": 0, + "narrative": "Key milestones have been met and the project is on schedule to deliver by closure date.", + "label": "no-move", + "why": "Published end date unchanged (31 Dec 2025). The narrative says the project 'is on schedule to deliver by closure date'.", + "matchedBy": "exact project name (case and punctuation normalised), unique in both releases", + "source": { + "current": { + "release": "IPA Annual Report 2016-17 (data as at 30 Sep 2016)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2017", + "csv": "https://assets.publishing.service.gov.uk/media/5a821ed6e5274a2e8ab57995/Annual_Report_-_consolidated_data_and_narratives.csv" + }, + "previous": { + "release": "IPA Annual Report 2015-16 (data as at 30 Sep 2015)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2016", + "csv": "https://assets.publishing.service.gov.uk/media/5a80a49ce5274a2e8ab51547/government_major_projects_portfolio_data_september_2015.csv" + } + } + }, + { + "id": "PLH3-B29", + "gmppId": "MOD_0092_1415-Q3", + "gmppIdSource": "from the 2019-20 release, same project name", + "project": "Armoured Infantry 2026", + "department": "MoD", + "prevYear": 2016, + "year": 2017, + "prevRelease": "2015-16", + "release": "2016-17", + "prevEnd": "2026-12-31", + "curEnd": "2026-12-31", + "prevEndAsPublished": "31/12/2026", + "curEndAsPublished": "31/12/2026", + "daysMoved": 0, + "narrative": "The equipment project (Warrior Capability Sustainment Project (WCSP)) remains on the critical path. The current forecast is for a 12 month slip to equipment delivery. Forthcoming negotiations with the Prime Contractor will be key to addressing this and will determine the impact of the equipment delivery schedule on the achievement of Programme milestones.", + "label": "no-move", + "why": "Published end date unchanged (31 Dec 2026). The narrative reports 'a 12 month slip to equipment delivery' but names no new programme end date.", + "doubt": "If a reader treats the equipment slip as a statement about the end date, this could be read as a published-date-check.", + "prevDepartment": "MOD", + "matchedBy": "exact project name (case and punctuation normalised), unique in both releases", + "source": { + "current": { + "release": "IPA Annual Report 2016-17 (data as at 30 Sep 2016)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2017", + "csv": "https://assets.publishing.service.gov.uk/media/5a821ed6e5274a2e8ab57995/Annual_Report_-_consolidated_data_and_narratives.csv" + }, + "previous": { + "release": "IPA Annual Report 2015-16 (data as at 30 Sep 2015)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2016", + "csv": "https://assets.publishing.service.gov.uk/media/5a80a49ce5274a2e8ab51547/government_major_projects_portfolio_data_september_2015.csv" + } + } + }, + { + "id": "PLH3-B30", + "gmppId": null, + "gmppIdSource": null, + "project": "ICT Re-procurement", + "department": "FCO", + "prevYear": 2014, + "year": 2015, + "prevRelease": "2013-14", + "release": "2014-15", + "prevEnd": "2013-11-30", + "curEnd": "2013-11-30", + "prevEndAsPublished": "30/11/2013", + "curEndAsPublished": "30/11/2013", + "daysMoved": 0, + "narrative": "The project end date reported above is a forecast based on suppliers' latest transition plans and project closure activities. The SMI is currently on schedule to complete its transition by end-April 2015. For the DI this is currently scheduled to be completed by end-July but its plan is in the process of being re-baselined as at the publication date for this return. ", + "label": "published-date-check", + "why": "Published end date unchanged (30 Nov 2013 in both releases, already past). The narrative says one element will 'complete its transition by end-April 2015' and another 'by end-July', with re-baselining under way. That names a current end about 20 months after the column.", + "matchedBy": "exact project name (case and punctuation normalised), unique in both releases", + "source": { + "current": { + "release": "MPA Annual Report 2014-15 (data as at 30 Sep 2014)", + "publication": "https://www.gov.uk/government/publications/major-projects-authority-annual-report-2015", + "csv": "https://assets.publishing.service.gov.uk/media/5a801db6ed915d74e33f88a0/GMPP_data_september_2014.csv" + }, + "previous": { + "release": "MPA Annual Report 2013-14 (data as at 30 Sep 2013)", + "publication": "https://www.gov.uk/government/publications/major-projects-authority-annual-report-2014", + "csv": "https://assets.publishing.service.gov.uk/media/5a7ea47a40f0b62305b823ee/Government_Major_Projects_Portfolio_data__September_2013__CSV_.csv" + } + } + }, + { + "id": "PLH3-B31", + "gmppId": null, + "gmppIdSource": null, + "project": "Legal Aid Reform Implementation", + "department": "MoJ", + "prevYear": 2014, + "year": 2015, + "prevRelease": "2013-14", + "release": "2014-15", + "prevEnd": "2013-10-31", + "curEnd": "2013-10-31", + "prevEndAsPublished": "31/10/2013", + "curEndAsPublished": "31/10/2013", + "daysMoved": 0, + "narrative": "The programme completed in June 2013, but was retained on the MPA reporting pending an independent post implementation review. This was completed in October 2014 and the programme is now formally closed.", + "label": "published-date-check", + "why": "Published end date unchanged (31 Oct 2013). The narrative says the programme completed in June 2013, but its post-implementation review 'was completed in October 2014 and the programme is now formally closed'. The closure date is about a year after the column.", + "doubt": "'Completed June 2013' is within 4.5 months of the column. Formal closure in Oct 2014 is the date that differs.", + "matchedBy": "exact project name (case and punctuation normalised), unique in both releases", + "source": { + "current": { + "release": "MPA Annual Report 2014-15 (data as at 30 Sep 2014)", + "publication": "https://www.gov.uk/government/publications/major-projects-authority-annual-report-2015", + "csv": "https://assets.publishing.service.gov.uk/media/5a801db6ed915d74e33f88a0/GMPP_data_september_2014.csv" + }, + "previous": { + "release": "MPA Annual Report 2013-14 (data as at 30 Sep 2013)", + "publication": "https://www.gov.uk/government/publications/major-projects-authority-annual-report-2014", + "csv": "https://assets.publishing.service.gov.uk/media/5a7ea47a40f0b62305b823ee/Government_Major_Projects_Portfolio_data__September_2013__CSV_.csv" + } + } + }, + { + "id": "PLH3-B32", + "gmppId": null, + "gmppIdSource": null, + "project": "Web Data Access (WDA) Project", + "department": "ONS", + "prevYear": 2014, + "year": 2015, + "prevRelease": "2013-14", + "release": "2014-15", + "prevEnd": "2013-12-31", + "curEnd": "2013-12-31", + "prevEndAsPublished": "31/12/2013", + "curEndAsPublished": "31/12/2013", + "daysMoved": 0, + "narrative": "Closed as per plan in September 2014 and has exited GMPP.", + "label": "published-date-check", + "why": "Published end date unchanged (31 Dec 2013). The narrative says the project 'Closed as per plan in September 2014'. That is 9 months after the published date.", + "matchedBy": "exact project name (case and punctuation normalised), unique in both releases", + "source": { + "current": { + "release": "MPA Annual Report 2014-15 (data as at 30 Sep 2014)", + "publication": "https://www.gov.uk/government/publications/major-projects-authority-annual-report-2015", + "csv": "https://assets.publishing.service.gov.uk/media/5a801db6ed915d74e33f88a0/GMPP_data_september_2014.csv" + }, + "previous": { + "release": "MPA Annual Report 2013-14 (data as at 30 Sep 2013)", + "publication": "https://www.gov.uk/government/publications/major-projects-authority-annual-report-2014", + "csv": "https://assets.publishing.service.gov.uk/media/5a7ea47a40f0b62305b823ee/Government_Major_Projects_Portfolio_data__September_2013__CSV_.csv" + } + } + }, + { + "id": "PLH3-B33", + "gmppId": null, + "gmppIdSource": null, + "project": "General Practice System of Choice (GPSoC) Replacement", + "department": "DOH", + "prevYear": 2015, + "year": 2016, + "prevRelease": "2014-15", + "release": "2015-16", + "prevEnd": "2015-03-31", + "curEnd": "2015-03-31", + "prevEndAsPublished": "31/03/2015", + "curEndAsPublished": "31/03/2015", + "daysMoved": 0, + "narrative": "The original Project End Date for the General Practice System of Choice Replacement Project was 31/03/15. An extension was requested and approved to extend the End Date to 31/10/15.\nA seven month extension was required because:\n• Supplier delays have impacted the delivery of Entry and Standard Requirements within required operational service dates. \n• Suppliers are late in the delivery of General Practice System of Choice Services specifically against Principal Clinical System and National Services (Summary Care Record and GP2GP) Requirements. \n• Current General Practice System of Choice Interface Mechanism pairing process has been limited due to delayed delivery of Principal Interface Management requirements, assurance of Subsidiary Supplier systems and the evolvement of supporting processes and test environments. This in turn may impact the ability to deliver Subsidiary Supplier pairings.\n• Programme and Commercial resource shortage is impacting the ability to deliver commissioned projects.\n\nThe Programme is aiming for the project to move into Business As Usual following the approval our the Project Closure Report by the end of the financial year 2015/16.", + "label": "published-date-check", + "why": "Published end date unchanged (31 Mar 2015 in both releases). The narrative says 'An extension was requested and approved to extend the End Date to 31/10/15', which is 7 months later than the column.", + "prevDepartment": "DoH Non Capital", + "matchedBy": "exact project name (case and punctuation normalised), unique in both releases", + "source": { + "current": { + "release": "IPA Annual Report 2015-16 (data as at 30 Sep 2015)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2016", + "csv": "https://assets.publishing.service.gov.uk/media/5a80a49ce5274a2e8ab51547/government_major_projects_portfolio_data_september_2015.csv" + }, + "previous": { + "release": "MPA Annual Report 2014-15 (data as at 30 Sep 2014)", + "publication": "https://www.gov.uk/government/publications/major-projects-authority-annual-report-2015", + "csv": "https://assets.publishing.service.gov.uk/media/5a801db6ed915d74e33f88a0/GMPP_data_september_2014.csv" + } + } + }, + { + "id": "PLH3-B34", + "gmppId": null, + "gmppIdSource": null, + "project": "Army Reserve Development Programme", + "department": "MoD", + "prevYear": 2016, + "year": 2017, + "prevRelease": "2015-16", + "release": "2016-17", + "prevEnd": "2017-01-01", + "curEnd": "2017-01-01", + "prevEndAsPublished": "01/01/2017", + "curEndAsPublished": "01/01/2017", + "daysMoved": 0, + "narrative": "The most recent Project Assurance Review concluded that whilst attaining the April 2019 target remains a challenge the programme is on track to realise the wider benefits of a Capable, Useable and Integrated Army Reserve and should graduate from the GMPP. The programme was removed from the GMPP on 5 June 2017. The IPA and SRO have agreed that final programme closure should be conditions based and SRO intent is to formally close the programme before the end of 2019 once the programme transition to BAU is fully completed. ", + "label": "published-date-check", + "why": "Published end date unchanged (1 Jan 2017). The narrative says the SRO intends 'to formally close the programme before the end of 2019'.", + "prevDepartment": "MOD", + "matchedBy": "exact project name (case and punctuation normalised), unique in both releases", + "source": { + "current": { + "release": "IPA Annual Report 2016-17 (data as at 30 Sep 2016)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2017", + "csv": "https://assets.publishing.service.gov.uk/media/5a821ed6e5274a2e8ab57995/Annual_Report_-_consolidated_data_and_narratives.csv" + }, + "previous": { + "release": "IPA Annual Report 2015-16 (data as at 30 Sep 2015)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2016", + "csv": "https://assets.publishing.service.gov.uk/media/5a80a49ce5274a2e8ab51547/government_major_projects_portfolio_data_september_2015.csv" + } + } + }, + { + "id": "PLH3-B35", + "gmppId": "MHCLG_0002_1920-Q4", + "gmppIdSource": "published in this release", + "project": "Building Safety Programme ACM Remediation", + "department": "DLUHC", + "prevYear": 2021, + "year": 2022, + "prevRelease": "2020-21", + "release": "2021-22", + "prevEnd": "2022-06-30", + "curEnd": "2022-06-30", + "daysMoved": 0, + "narrative": "The revised end date will be built in as the programme evaluates its objectives and dates. Despite the increase in buildings within scope, the majority of buildings will have completed remediation by 2023-Q4, with the project end date estimated as 2024-Q4.", + "label": "published-date-check", + "why": "Published end date unchanged (30 Jun 2022 in both releases). The narrative says 'the project end date [is] estimated as 2024-Q4' and that a revised end date 'will be built in'. That is about 2.5 years after the column.", + "matchedBy": "GMPP ID", + "source": { + "current": { + "release": "IPA Annual Report 2021-22 (data as at 31 Mar 2022)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022", + "csv": "https://assets.publishing.service.gov.uk/media/62d6c047e90e071e753d6936/GMPP_Government_Major_Projects_Portfolio_AR_Data_March_2022.csv" + }, + "previous": { + "release": "IPA Annual Report 2020-21 (data as at 31 Mar 2021)", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021", + "csv": "https://assets.publishing.service.gov.uk/media/60eecae48fa8f50c7ca55af1/GMPP_Government_Major_Projects_Portofolio_AR_Data_March_2021.csv" + } + } + } + ] +} \ No newline at end of file diff --git a/bench/real-cases/projectlens-heldout4.json b/bench/real-cases/projectlens-heldout4.json new file mode 100644 index 0000000..6cd8486 --- /dev/null +++ b/bench/real-cases/projectlens-heldout4.json @@ -0,0 +1,783 @@ +{ + "meta": { + "description": "Fourth independent held-out GMPP set: 30 real year-on-year pairs across 30 distinct projects. Do not tune on this set.", + "yearConvention": "Year N denotes the annual-report release published in N and labelled (N-1)-N. The 2013 departmental baselines report Q2 2012-13; the 2014 through 2019 consolidated releases report data as at 30 September of the preceding calendar year.", + "authorisation": "On 30 October 2026 the user authorised any release years, including older years, provided every project is absent from sets 1–3 in both repositories and the original ProjectLens inputs.", + "labelRules": { + "contradiction": "The published end date moved and the narrative says unchanged/on track/on schedule, or names a current end date more than 14 days from the published one, without stating the move.", + "explained": "The published end date moved and the narrative states the move, revision, extension, delay or acceleration. This takes precedence over an on-track claim in the same narrative.", + "no-move": "The published end date is identical and the narrative does not name a different current end date.", + "published-date-check": "The published end date is identical but the narrative names a different current end date." + }, + "matching": "Pairs use unique exact project names after case and punctuation normalisation. The selected releases do not publish GMPP IDs, so gmppId is omitted rather than invented. Exclusions use both names and available GMPP IDs, plus conservative aliases.", + "narrativeVerbatim": "Complete current-release departmental schedule cell, retaining spelling, whitespace, punctuation and embedded line endings. No other narrative fields are appended.", + "dates": "ISO 8601 conversion of published end-date cells. BIS 2013 uses month/day/year; other selected 2013 sources and subsequent releases use day/month/year. daysMoved = curEnd minus prevEnd in calendar days; negative means earlier.", + "interpretation": "These labels describe disagreement between published schedule cells and commentary under the supplied rules. They do not establish project performance or wrongdoing. Dates can refer to different planning horizons or stages.", + "doubtfulLabels": { + "PLH4-B01": "Enterprise Zones moves from a 2015 end date to a 2038 horizon. The data do not establish whether the reporting horizon changed; the literal on-schedule rule gives contradiction.", + "PLH4-B02": "The 30-day change is 1 March to 31 March. This may reflect month-boundary precision rather than a substantive delay; published cells are retained exactly.", + "PLH4-B03": "Broadmoor commentary discusses construction activities. Programme closure may use a different scope, although the schedule cell says all activities are on or ahead of programme.", + "PLH4-B06": "New Employment Model says on track by 2021, which remains true at year precision despite a 28-day change within October. The supplied on-track rule gives contradiction." + }, + "additionalSourceCaveats": { + "PLH4-B10": "BIS explicitly acknowledges a later date but also gives a corrected date that differs from the column; explained takes precedence.", + "PLH4-B11": "Benefit Cap explains remaining beyond the initial plan but reports an actual closure later than the current column.", + "PLH4-B16": "Integrated Delivery acknowledges an end-date revision; its narrative also describes operational milestones later than the column.", + "PLH4-B30": "Procurement Transformation explicitly distinguishes key-change go-live from programme closure. The label requests a published-date check; the scope distinction may explain it." + }, + "licence": "Contains public sector information licensed under the Open Government Licence v3.0.", + "validation": "No implementation, test or engine files were read and neither product nor benchmark was run. Independent fixture checks are recorded in evidence/projectlens-validation.json." + }, + "cases": [ + { + "id": "PLH4-B01", + "project": "Enterprise Zones Programme", + "department": "DCLG", + "prevYear": 2013, + "year": 2014, + "prevEnd": "2015-03-31", + "curEnd": "2038-03-31", + "daysMoved": 8401, + "narrative": "On schedule", + "source": { + "previous": { + "publication": "https://www.gov.uk/government/publications/government-major-projects-portfolio-data-for-dclg-2013", + "csv": "https://assets.publishing.service.gov.uk/media/5a7c83a7e5274a2674eab2c6/gmpp-data-DCLG-q2-2012-13.csv", + "release": "2012-13 annual-report release (published 2013)" + }, + "current": { + "publication": "https://www.gov.uk/government/publications/major-projects-authority-annual-report-2014", + "csv": "https://assets.publishing.service.gov.uk/media/5a7ea47a40f0b62305b823ee/Government_Major_Projects_Portfolio_data__September_2013__CSV_.csv", + "release": "2013-14 annual-report release (published 2014)" + } + }, + "label": "contradiction", + "why": "The published end date moves from 31 March 2015 to 31 March 2038. The entire schedule narrative says \"On schedule\" and states no change." + }, + { + "id": "PLH4-B02", + "project": "Submarine Enterprise Performance Programme", + "department": "MOD", + "prevYear": 2013, + "year": 2014, + "prevEnd": "2014-03-01", + "curEnd": "2014-03-31", + "daysMoved": 30, + "narrative": "The programme is on track with benefit identification and benefit delivery underway in both financial and non-financial benefits. Identification of enduring benefits has now commenced. The signing of the Rolls-Royce and BAES foundation contracts have been achieved (February 2013 and July 2013 respectively), with the remaining foundation contract with Babcock (the MSDF) due in Spring 2014. The programme is still on track to transition to business as usual following signature of MSDF.", + "source": { + "previous": { + "publication": "https://www.gov.uk/government/publications/government-major-projects-portfolio-data-for-mod-2013", + "csv": "https://assets.publishing.service.gov.uk/media/5a7c35bbed915d76e2ebbd13/20130524_mod_gmpp_data.csv", + "release": "2012-13 annual-report release (published 2013)" + }, + "current": { + "publication": "https://www.gov.uk/government/publications/major-projects-authority-annual-report-2014", + "csv": "https://assets.publishing.service.gov.uk/media/5a7ea47a40f0b62305b823ee/Government_Major_Projects_Portfolio_data__September_2013__CSV_.csv", + "release": "2013-14 annual-report release (published 2014)" + } + }, + "label": "contradiction", + "why": "The published end date moves 30 days later. The narrative twice says the programme is on track, including its transition to business as usual, and states no change to the end date." + }, + { + "id": "PLH4-B03", + "project": "Broadmoor Redevelopment Programme", + "department": "DoH Capital", + "prevYear": 2014, + "year": 2015, + "prevEnd": "2018-11-01", + "curEnd": "2020-02-11", + "daysMoved": 467, + "narrative": "As at 30th September 2014 all activities were on programme - the site generator had been relocated; the old PMVA building and the boiler house chimneys had been demolished; the top soil had been stripped; the foundations had been removed. During the period 1st October 2014 - 31st March 2015 the following (will) have taken place - water main for new Hospital; cut and fill continues; foundation piling (1 x ward block, central building and new entrance building); pre-cast concrete frame installation; off-site construction (concrete and windows); delivery of off site manufactured service riser modules to serve the bedrooms; further development of operational commissioning and transition planning programme (separate from construction programme) has been ramped up and is progressing well. All activities are on or slightly ahead of programme.\n", + "source": { + "previous": { + "publication": "https://www.gov.uk/government/publications/major-projects-authority-annual-report-2014", + "csv": "https://assets.publishing.service.gov.uk/media/5a7ea47a40f0b62305b823ee/Government_Major_Projects_Portfolio_data__September_2013__CSV_.csv", + "release": "2013-14 annual-report release (published 2014)" + }, + "current": { + "publication": "https://www.gov.uk/government/publications/major-projects-authority-annual-report-2015", + "csv": "https://assets.publishing.service.gov.uk/media/5a801db6ed915d74e33f88a0/GMPP_data_september_2014.csv", + "release": "2014-15 annual-report release (published 2015)" + } + }, + "label": "contradiction", + "why": "The published end date moves 467 days later. The narrative says all activities were on programme and are on or slightly ahead of programme, without stating a schedule change." + }, + { + "id": "PLH4-B04", + "project": "Health Visitor Programme", + "department": "DoH Non Capital", + "prevYear": 2014, + "year": 2015, + "prevEnd": "2015-06-30", + "curEnd": "2015-12-31", + "daysMoved": 184, + "narrative": "The programme is on-track with no significant changes to dates of deliverables and key milestones.\n\nWorkforce expansion: at the time of preparing this report, the most recent management information (November 2014) published by NHS England estimates an indicative count of 11,290 FTE health visitors; 3,198 more than the May 2010 baseline, representing an increase of 40%. At the time of preparing this report, the latest official figures (September 2014) show there were 10,800 full time equivalent health visitors; 2,708 more than in May 2010. Since 2010 around 7,500 health visitor training places have been commissioned, with the annual total growing from around 550 to around 2,700 in 2013, representing a five-fold increase in the number of health visitor trainees starting their training. This investment in training has delivered most of the expansion in health visitor workforce we are now seeing. In addition, there are a further 1,200 training places being commissioned in 2014/15 - this will ensure that the workforce growth is sustained beyond the end of the programme.\n\nService transformation: at the time of preparing this report, the new service model has been tested in early implementer sites and case study material published. These sites saw increases in the numbers of children receiving the 2-2½ year review almost double. We have six published priorities for demonstrating success and building sustainable services. Data collection and reporting is in place so that delivery of service transformation can be demonstrated.\n\nTransfer of health visitor commissioning to Local Authorities: at the time of preparing this report, the Baseline Agreement Exercise has been issued to support the issuing of allocations to Local Authorities in February 2015 and the draft regulations to mandate key checks have been published.", + "source": { + "previous": { + "publication": "https://www.gov.uk/government/publications/major-projects-authority-annual-report-2014", + "csv": "https://assets.publishing.service.gov.uk/media/5a7ea47a40f0b62305b823ee/Government_Major_Projects_Portfolio_data__September_2013__CSV_.csv", + "release": "2013-14 annual-report release (published 2014)" + }, + "current": { + "publication": "https://www.gov.uk/government/publications/major-projects-authority-annual-report-2015", + "csv": "https://assets.publishing.service.gov.uk/media/5a801db6ed915d74e33f88a0/GMPP_data_september_2014.csv", + "release": "2014-15 annual-report release (published 2015)" + } + }, + "label": "contradiction", + "why": "The published end date moves 184 days later. The narrative says the programme is on-track with no significant changes to deliverable dates and key milestones, without stating the move." + }, + { + "id": "PLH4-B05", + "project": "Harmondsworth and Colnbrook Retender", + "department": "HO", + "prevYear": 2014, + "year": 2015, + "prevEnd": "2014-08-31", + "curEnd": "2015-06-01", + "daysMoved": 274, + "narrative": "Project ran to agreed schedule.", + "source": { + "previous": { + "publication": "https://www.gov.uk/government/publications/major-projects-authority-annual-report-2014", + "csv": "https://assets.publishing.service.gov.uk/media/5a7ea47a40f0b62305b823ee/Government_Major_Projects_Portfolio_data__September_2013__CSV_.csv", + "release": "2013-14 annual-report release (published 2014)" + }, + "current": { + "publication": "https://www.gov.uk/government/publications/major-projects-authority-annual-report-2015", + "csv": "https://assets.publishing.service.gov.uk/media/5a801db6ed915d74e33f88a0/GMPP_data_september_2014.csv", + "release": "2014-15 annual-report release (published 2015)" + } + }, + "label": "contradiction", + "why": "The published end date moves 274 days later. The complete schedule narrative says \"Project ran to agreed schedule.\" and states no change." + }, + { + "id": "PLH4-B06", + "project": "New Employment Model", + "department": "MoD", + "prevYear": 2014, + "year": 2015, + "prevEnd": "2021-10-01", + "curEnd": "2021-10-29", + "daysMoved": 28, + "narrative": "The NEM programme remains on track to deliver its agreed remit by 2021; the transition plans for pay reform and accommodation charging will have completed by then. Forces Help To Buy (FHTB) interest-free loan pilot was successfully launched in April 2014. The next milestone is harmonisation of Engagement Structures which will take effect from April 2015. Further change is anticipated in 2016 when a new pay model and accommodation charging system are planned to go-live.", + "source": { + "previous": { + "publication": "https://www.gov.uk/government/publications/major-projects-authority-annual-report-2014", + "csv": "https://assets.publishing.service.gov.uk/media/5a7ea47a40f0b62305b823ee/Government_Major_Projects_Portfolio_data__September_2013__CSV_.csv", + "release": "2013-14 annual-report release (published 2014)" + }, + "current": { + "publication": "https://www.gov.uk/government/publications/major-projects-authority-annual-report-2015", + "csv": "https://assets.publishing.service.gov.uk/media/5a801db6ed915d74e33f88a0/GMPP_data_september_2014.csv", + "release": "2014-15 annual-report release (published 2015)" + } + }, + "label": "contradiction", + "why": "The published end date moves 28 days later. The narrative says the programme remains on track to deliver its agreed remit by 2021, without stating a change to programme completion." + }, + { + "id": "PLH4-B07", + "project": "2011 Census", + "department": "ONS", + "prevYear": 2014, + "year": 2015, + "prevEnd": "2014-03-31", + "curEnd": "2014-09-30", + "daysMoved": 183, + "narrative": "The Programme continued as scheduled and formally closed on 1st October 2014, exiting GMPP.", + "source": { + "previous": { + "publication": "https://www.gov.uk/government/publications/major-projects-authority-annual-report-2014", + "csv": "https://assets.publishing.service.gov.uk/media/5a7ea47a40f0b62305b823ee/Government_Major_Projects_Portfolio_data__September_2013__CSV_.csv", + "release": "2013-14 annual-report release (published 2014)" + }, + "current": { + "publication": "https://www.gov.uk/government/publications/major-projects-authority-annual-report-2015", + "csv": "https://assets.publishing.service.gov.uk/media/5a801db6ed915d74e33f88a0/GMPP_data_september_2014.csv", + "release": "2014-15 annual-report release (published 2015)" + } + }, + "label": "contradiction", + "why": "The published end date moves 183 days later. The narrative says the programme continued as scheduled and gives its actual closure date, without saying the schedule changed. The stated 1 October closure is one day after the current published end date." + }, + { + "id": "PLH4-B08", + "project": "CAP Delivery Programme", + "department": "DEFRA", + "prevYear": 2016, + "year": 2017, + "prevEnd": "2016-03-31", + "curEnd": "2017-03-31", + "daysMoved": 365, + "narrative": "The Programme remained on schedule and formally closed on 31 March 2017, having developed nearly all the functionality required for the Minimum Viable Service and the Minimum Credible Service, the remainder of which will be delivered through business as usual activities. ", + "source": { + "previous": { + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2016", + "csv": "https://assets.publishing.service.gov.uk/media/5a80a49ce5274a2e8ab51547/government_major_projects_portfolio_data_september_2015.csv", + "release": "2015-16 annual-report release (published 2016)" + }, + "current": { + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2017", + "csv": "https://assets.publishing.service.gov.uk/media/5a821ed6e5274a2e8ab57995/Annual_Report_-_consolidated_data_and_narratives.csv", + "release": "2016-17 annual-report release (published 2017)" + } + }, + "label": "contradiction", + "why": "The published end date moves 365 days later. The narrative says the programme remained on schedule and formally closed on the current published date, without stating a move from the previous date." + }, + { + "id": "PLH4-B09", + "project": "FE Capital Investment Programme", + "department": "BIS", + "prevYear": 2013, + "year": 2014, + "prevEnd": "2015-03-31", + "curEnd": "2015-09-01", + "daysMoved": 154, + "narrative": "The first MPA Annual Report in May 2013 stated the project end date as the end of the financial year for which funding is available. The end date shown this year 01/09/15 is the date by which the last of the programme funded projects will become operational", + "source": { + "previous": { + "publication": "https://www.gov.uk/government/publications/government-major-projects-portfolio-data-for-bis-2013", + "csv": "https://assets.publishing.service.gov.uk/media/5a7c324a40f0b67d0b11f801/BIS-_gmpp-data-q2-2012-13.csv", + "release": "2012-13 annual-report release (published 2013)" + }, + "current": { + "publication": "https://www.gov.uk/government/publications/major-projects-authority-annual-report-2014", + "csv": "https://assets.publishing.service.gov.uk/media/5a7ea47a40f0b62305b823ee/Government_Major_Projects_Portfolio_data__September_2013__CSV_.csv", + "release": "2013-14 annual-report release (published 2014)" + } + }, + "label": "explained", + "why": "The narrative explicitly contrasts the end date in the first annual report with the date shown this year and explains the change from the funding horizon to when the last funded projects become operational." + }, + { + "id": "PLH4-B10", + "project": "BIS Shared Services", + "department": "BIS", + "prevYear": 2013, + "year": 2014, + "prevEnd": "2013-04-30", + "curEnd": "2014-04-01", + "daysMoved": 336, + "narrative": "The project end date should read 01/04/15 (as per the Q2 2012/13 GMPP report).\n\n\n\nAdditional scope was incorporated into the programme in 2012, in line with the objectives of the Civil Service Reform programme. The later project end date is an indicative date reflecting the enlarged scope of the programme. Given that work is being progressed under business cases dedicated to individual organisations, the end date cannot be finalised until all business cases have been completed.\n", + "source": { + "previous": { + "publication": "https://www.gov.uk/government/publications/government-major-projects-portfolio-data-for-bis-2013", + "csv": "https://assets.publishing.service.gov.uk/media/5a7c324a40f0b67d0b11f801/BIS-_gmpp-data-q2-2012-13.csv", + "release": "2012-13 annual-report release (published 2013)" + }, + "current": { + "publication": "https://www.gov.uk/government/publications/major-projects-authority-annual-report-2014", + "csv": "https://assets.publishing.service.gov.uk/media/5a7ea47a40f0b62305b823ee/Government_Major_Projects_Portfolio_data__September_2013__CSV_.csv", + "release": "2013-14 annual-report release (published 2014)" + } + }, + "label": "explained", + "why": "The narrative explicitly refers to a later project end date and explains enlarged programme scope. It also says the date should read 1 April 2015, which differs from the published 1 April 2014; the stated later-date explanation determines this label." + }, + { + "id": "PLH4-B11", + "project": "Benefit Cap", + "department": "DWP", + "prevYear": 2013, + "year": 2014, + "prevEnd": "2013-07-31", + "curEnd": "2013-12-19", + "daysMoved": 141, + "narrative": "The project closed on 20 February 2014. While implementation had taken place successfully, a reduced project remained in place beyond the initial planning date to ensure a smooth handover into business as usual occurred.", + "source": { + "previous": { + "publication": "https://www.gov.uk/government/publications/government-major-projects-portfolio-data-for-dwp-2013", + "csv": "https://assets.publishing.service.gov.uk/media/5a74b963ed915d502d6ca79b/gmpp-data-DWP-q2-2012-13.csv", + "release": "2012-13 annual-report release (published 2013)" + }, + "current": { + "publication": "https://www.gov.uk/government/publications/major-projects-authority-annual-report-2014", + "csv": "https://assets.publishing.service.gov.uk/media/5a7ea47a40f0b62305b823ee/Government_Major_Projects_Portfolio_data__September_2013__CSV_.csv", + "release": "2013-14 annual-report release (published 2014)" + } + }, + "label": "explained", + "why": "The narrative states that a reduced project remained in place beyond the initial planning date to ensure handover to business as usual. Its stated actual closure, 20 February 2014, is later still than the current published date." + }, + { + "id": "PLH4-B12", + "project": "Puma Helicopter Life Extension Programme", + "department": "MOD", + "prevYear": 2013, + "year": 2014, + "prevEnd": "2014-10-31", + "curEnd": "2015-12-31", + "daysMoved": 426, + "narrative": "There are a number of contributing factors to the schedule deviation including: greater than originally expected volumes of remedial work that disrupted both development and production activity; delays in sourcing some critical Government Furnished Equipment; and delays to the development programme caused by technical issues and the loss of key contractor flight test personnel in an unrelated fatal helicopter accident. The Review Note, approved in April 2013, forecast Initial Operating Capability (IOC) for March 2015 and Full Operating Capability for December 2015. ", + "source": { + "previous": { + "publication": "https://www.gov.uk/government/publications/government-major-projects-portfolio-data-for-mod-2013", + "csv": "https://assets.publishing.service.gov.uk/media/5a7c35bbed915d76e2ebbd13/20130524_mod_gmpp_data.csv", + "release": "2012-13 annual-report release (published 2013)" + }, + "current": { + "publication": "https://www.gov.uk/government/publications/major-projects-authority-annual-report-2014", + "csv": "https://assets.publishing.service.gov.uk/media/5a7ea47a40f0b62305b823ee/Government_Major_Projects_Portfolio_data__September_2013__CSV_.csv", + "release": "2013-14 annual-report release (published 2014)" + } + }, + "label": "explained", + "why": "The narrative explicitly describes a schedule deviation, identifies the causes of delay and gives Full Operating Capability in December 2015, consistent with the new published end date." + }, + { + "id": "PLH4-B13", + "project": "Type 45 Destroyers", + "department": "MOD", + "prevYear": 2013, + "year": 2014, + "prevEnd": "2014-07-31", + "curEnd": "2014-03-31", + "daysMoved": -122, + "narrative": "The 6th T45 was released to service ahead of schedule in common with the remainder of the Class. The support solution in place had the flexibility to deal with all early arrivals and the RN benefitted by having operational assets available sooner than programmed.", + "source": { + "previous": { + "publication": "https://www.gov.uk/government/publications/government-major-projects-portfolio-data-for-mod-2013", + "csv": "https://assets.publishing.service.gov.uk/media/5a7c35bbed915d76e2ebbd13/20130524_mod_gmpp_data.csv", + "release": "2012-13 annual-report release (published 2013)" + }, + "current": { + "publication": "https://www.gov.uk/government/publications/major-projects-authority-annual-report-2014", + "csv": "https://assets.publishing.service.gov.uk/media/5a7ea47a40f0b62305b823ee/Government_Major_Projects_Portfolio_data__September_2013__CSV_.csv", + "release": "2013-14 annual-report release (published 2014)" + } + }, + "label": "explained", + "why": "The published end date moves 122 days earlier. The narrative explicitly states release to service ahead of schedule and operational assets available sooner than programmed." + }, + { + "id": "PLH4-B14", + "project": "Fraud, Error and Debt Programme", + "department": "DWP", + "prevYear": 2014, + "year": 2015, + "prevEnd": "2015-03-31", + "curEnd": "2017-03-31", + "daysMoved": 731, + "narrative": "A number of new initiatives have been added to the Programme. This change in scope, along with dependencies with other programmes, has resulted in a change to the delivery schedule, including moving the end date of the Programme to 2017. These new initiatives will deliver further fraud, error and debt savings for the taxpayer.", + "source": { + "previous": { + "publication": "https://www.gov.uk/government/publications/major-projects-authority-annual-report-2014", + "csv": "https://assets.publishing.service.gov.uk/media/5a7ea47a40f0b62305b823ee/Government_Major_Projects_Portfolio_data__September_2013__CSV_.csv", + "release": "2013-14 annual-report release (published 2014)" + }, + "current": { + "publication": "https://www.gov.uk/government/publications/major-projects-authority-annual-report-2015", + "csv": "https://assets.publishing.service.gov.uk/media/5a801db6ed915d74e33f88a0/GMPP_data_september_2014.csv", + "release": "2014-15 annual-report release (published 2015)" + } + }, + "label": "explained", + "why": "The narrative explicitly says the change in scope and programme dependencies changed the delivery schedule, including moving the end date to 2017." + }, + { + "id": "PLH4-B15", + "project": "Next Generation Estates Contracts", + "department": "MoD", + "prevYear": 2014, + "year": 2015, + "prevEnd": "2014-04-01", + "curEnd": "2015-03-20", + "daysMoved": 353, + "narrative": "Tranche 1 In Service Date (ISD) took place in Q3 2014/15 and is now in Steady State running, NHP's ISD took place in Q3 14/15 and is now in Steady State.\nTranche 2 ISD is scheduled for Q4 14/15. Regional Frameworks for Scotland - Successful Bidders letters issued Q3 2014/15. Regional Framework for South West and South East - Contract Award Q4 2015/16. NGEC Programme delay of one year was caused through a combination of delays to approvals, limited number of subject matter experts, the integration of a new Integrated Management System (IMS), the Enhanced Operating Model and the integration of other programmes into NGEC.", + "source": { + "previous": { + "publication": "https://www.gov.uk/government/publications/major-projects-authority-annual-report-2014", + "csv": "https://assets.publishing.service.gov.uk/media/5a7ea47a40f0b62305b823ee/Government_Major_Projects_Portfolio_data__September_2013__CSV_.csv", + "release": "2013-14 annual-report release (published 2014)" + }, + "current": { + "publication": "https://www.gov.uk/government/publications/major-projects-authority-annual-report-2015", + "csv": "https://assets.publishing.service.gov.uk/media/5a801db6ed915d74e33f88a0/GMPP_data_september_2014.csv", + "release": "2014-15 annual-report release (published 2015)" + } + }, + "label": "explained", + "why": "The published end date moves 353 days later. The narrative explicitly states a programme delay of one year and describes the contributing causes." + }, + { + "id": "PLH4-B16", + "project": "Integrated Delivery Programme", + "department": "MoJ", + "prevYear": 2014, + "year": 2015, + "prevEnd": "2014-03-01", + "curEnd": "2014-09-01", + "daysMoved": 184, + "narrative": "Client and Cost Management System (CCMS) is the online system through which providers can submit civil legal aid applications. National rollout of voluntary usage of CCMS commenced on 31st March 2014 and was completed on 29th September. Contractual Notices outlining the timeline to mandatory use of the system were issued to providers on 26th January 2015. This will mandate the use of CCMS for new legal aid applications from 1st October 2015. The 8 month lead in time is to provide firms with sufficient time to train their staff and integrate the system into their businesses. There has been a steady increase in usage with approximately two-thirds of providers using the system to process applications, equating to c.50% of applications being processed digitally.\nThe project end date has consequently been revised accordingly.", + "source": { + "previous": { + "publication": "https://www.gov.uk/government/publications/major-projects-authority-annual-report-2014", + "csv": "https://assets.publishing.service.gov.uk/media/5a7ea47a40f0b62305b823ee/Government_Major_Projects_Portfolio_data__September_2013__CSV_.csv", + "release": "2013-14 annual-report release (published 2014)" + }, + "current": { + "publication": "https://www.gov.uk/government/publications/major-projects-authority-annual-report-2015", + "csv": "https://assets.publishing.service.gov.uk/media/5a801db6ed915d74e33f88a0/GMPP_data_september_2014.csv", + "release": "2014-15 annual-report release (published 2015)" + } + }, + "label": "explained", + "why": "The narrative explains the rollout and lead-in period, then explicitly states that the project end date has consequently been revised accordingly. This acknowledges a revision even though its later operational milestones extend beyond the current published date." + }, + { + "id": "PLH4-B17", + "project": "100000 Genomes Project", + "department": "DHSC", + "prevYear": 2017, + "year": 2018, + "prevEnd": "2017-12-31", + "curEnd": "2018-12-31", + "daysMoved": 365, + "narrative": "To fulfil the vision of the Project, we are always working at the edge of known science. We have made good progress, but as with all scientific research, it takes time to get it right. This is why Genomics England, the Department of Health and NHS England have all agreed that the project will be extended from 2017 until the end of 2018.\rGenomics England and NHS England report that recruitment of the rare disease element of the project is going well. Delivery of the cancer element of the project remains challenging but is improving. \rCancer Accelerator sites and a fast turnaround of cancer reports and additional resources should improve recruitment. The option is being explored as a contingency to open the sequencing to other research cohorts if necessary for cancer recruitment to ensure the target is met.", + "source": { + "previous": { + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2017", + "csv": "https://assets.publishing.service.gov.uk/media/5a821ed6e5274a2e8ab57995/Annual_Report_-_consolidated_data_and_narratives.csv", + "release": "2016-17 annual-report release (published 2017)" + }, + "current": { + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2018", + "csv": "https://assets.publishing.service.gov.uk/media/5b3e2e2340f0b678bc5d018c/csv-ipa-government-major-projects-portfolio-data-september-2017.csv", + "release": "2017-18 annual-report release (published 2018)" + } + }, + "label": "explained", + "why": "The narrative explicitly states that the project will be extended from 2017 until the end of 2018, matching the published change." + }, + { + "id": "PLH4-B18", + "project": "Health and Care Modernisation Transition Programme", + "department": "DoH", + "prevYear": 2013, + "year": 2014, + "prevEnd": "2013-04-01", + "curEnd": "2013-04-01", + "daysMoved": 0, + "narrative": "The Transition Programme closed when it delivered the health and care reforms on 1 April 2013. ", + "source": { + "previous": { + "publication": "https://www.gov.uk/government/publications/government-major-projects-portfolio-data-for-department-of-health-2013--2", + "csv": "https://assets.publishing.service.gov.uk/media/5a7cab85ed915d6969f46841/gmpp-data-DH-q2-2012-13.csv", + "release": "2012-13 annual-report release (published 2013)" + }, + "current": { + "publication": "https://www.gov.uk/government/publications/major-projects-authority-annual-report-2014", + "csv": "https://assets.publishing.service.gov.uk/media/5a7ea47a40f0b62305b823ee/Government_Major_Projects_Portfolio_data__September_2013__CSV_.csv", + "release": "2013-14 annual-report release (published 2014)" + } + }, + "label": "no-move", + "why": "Both releases publish 1 April 2013. The narrative states that the programme closed on that date and names no different current end date." + }, + { + "id": "PLH4-B19", + "project": "Summary Care Record (SCR)", + "department": "DoH", + "prevYear": 2013, + "year": 2014, + "prevEnd": "2016-03-31", + "curEnd": "2016-03-31", + "daysMoved": 0, + "narrative": "There has been no change in any of the critical milestones and the project remains due to complete for the end of March 2016", + "source": { + "previous": { + "publication": "https://www.gov.uk/government/publications/government-major-projects-portfolio-data-for-department-of-health-2013--2", + "csv": "https://assets.publishing.service.gov.uk/media/5a7cab85ed915d6969f46841/gmpp-data-DH-q2-2012-13.csv", + "release": "2012-13 annual-report release (published 2013)" + }, + "current": { + "publication": "https://www.gov.uk/government/publications/major-projects-authority-annual-report-2014", + "csv": "https://assets.publishing.service.gov.uk/media/5a7ea47a40f0b62305b823ee/Government_Major_Projects_Portfolio_data__September_2013__CSV_.csv", + "release": "2013-14 annual-report release (published 2014)" + } + }, + "label": "no-move", + "why": "Both releases publish 31 March 2016. The narrative says there has been no change and completion remains due at the end of March 2016." + }, + { + "id": "PLH4-B20", + "project": "Southern Programme for IT", + "department": "DoH", + "prevYear": 2013, + "year": 2014, + "prevEnd": "2015-10-31", + "curEnd": "2015-10-31", + "daysMoved": 0, + "narrative": "Upgrades and additional Clinical functionality continue to be deployed to schedule, such as the upgrades to the RiO electronic patient record system in Community and Mental Health care settings.", + "source": { + "previous": { + "publication": "https://www.gov.uk/government/publications/government-major-projects-portfolio-data-for-department-of-health-2013--2", + "csv": "https://assets.publishing.service.gov.uk/media/5a7cab85ed915d6969f46841/gmpp-data-DH-q2-2012-13.csv", + "release": "2012-13 annual-report release (published 2013)" + }, + "current": { + "publication": "https://www.gov.uk/government/publications/major-projects-authority-annual-report-2014", + "csv": "https://assets.publishing.service.gov.uk/media/5a7ea47a40f0b62305b823ee/Government_Major_Projects_Portfolio_data__September_2013__CSV_.csv", + "release": "2013-14 annual-report release (published 2014)" + } + }, + "label": "no-move", + "why": "The published end date is identical. The narrative says additional clinical functionality continues to deploy to schedule and names no different current end date." + }, + { + "id": "PLH4-B21", + "project": "N3 Extension", + "department": "DoH", + "prevYear": 2013, + "year": 2014, + "prevEnd": "2014-03-31", + "curEnd": "2014-03-31", + "daysMoved": 0, + "narrative": "Programme is on schedule to end as per the current approved business case.", + "source": { + "previous": { + "publication": "https://www.gov.uk/government/publications/government-major-projects-portfolio-data-for-department-of-health-2013--2", + "csv": "https://assets.publishing.service.gov.uk/media/5a7cab85ed915d6969f46841/gmpp-data-DH-q2-2012-13.csv", + "release": "2012-13 annual-report release (published 2013)" + }, + "current": { + "publication": "https://www.gov.uk/government/publications/major-projects-authority-annual-report-2014", + "csv": "https://assets.publishing.service.gov.uk/media/5a7ea47a40f0b62305b823ee/Government_Major_Projects_Portfolio_data__September_2013__CSV_.csv", + "release": "2013-14 annual-report release (published 2014)" + } + }, + "label": "no-move", + "why": "The published end date is identical. The narrative says the programme is on schedule to end under the approved business case and names no different current end date." + }, + { + "id": "PLH4-B22", + "project": "CAB Variation", + "department": "DoH", + "prevYear": 2013, + "year": 2014, + "prevEnd": "2013-12-15", + "curEnd": "2013-12-15", + "daysMoved": 0, + "narrative": "The project was delivered on schedule on 15 December 2013.", + "source": { + "previous": { + "publication": "https://www.gov.uk/government/publications/government-major-projects-portfolio-data-for-department-of-health-2013--2", + "csv": "https://assets.publishing.service.gov.uk/media/5a7cab85ed915d6969f46841/gmpp-data-DH-q2-2012-13.csv", + "release": "2012-13 annual-report release (published 2013)" + }, + "current": { + "publication": "https://www.gov.uk/government/publications/major-projects-authority-annual-report-2014", + "csv": "https://assets.publishing.service.gov.uk/media/5a7ea47a40f0b62305b823ee/Government_Major_Projects_Portfolio_data__September_2013__CSV_.csv", + "release": "2013-14 annual-report release (published 2014)" + } + }, + "label": "no-move", + "why": "Both releases publish 15 December 2013. The narrative states that delivery occurred on that date." + }, + { + "id": "PLH4-B23", + "project": "UKERP", + "department": "FCO", + "prevYear": 2013, + "year": 2014, + "prevEnd": "2016-08-01", + "curEnd": "2016-08-01", + "daysMoved": 0, + "narrative": "No change", + "source": { + "previous": { + "publication": "https://www.gov.uk/government/publications/government-major-projects-portfolio-data-for-the-foreign-and-commonwealth-office-2013", + "csv": "https://assets.publishing.service.gov.uk/media/5a7c8ce3ed915d48c2410849/gmpp-data-FCO-q2-2012-13.csv", + "release": "2012-13 annual-report release (published 2013)" + }, + "current": { + "publication": "https://www.gov.uk/government/publications/major-projects-authority-annual-report-2014", + "csv": "https://assets.publishing.service.gov.uk/media/5a7ea47a40f0b62305b823ee/Government_Major_Projects_Portfolio_data__September_2013__CSV_.csv", + "release": "2013-14 annual-report release (published 2014)" + } + }, + "label": "no-move", + "why": "The published end date is identical. The complete schedule narrative says \"No change\" and names no different current end date." + }, + { + "id": "PLH4-B24", + "project": "Logistics Commodities Services Transformation", + "department": "MOD", + "prevYear": 2013, + "year": 2014, + "prevEnd": "2018-02-01", + "curEnd": "2018-02-01", + "daysMoved": 0, + "narrative": "No change", + "source": { + "previous": { + "publication": "https://www.gov.uk/government/publications/government-major-projects-portfolio-data-for-mod-2013", + "csv": "https://assets.publishing.service.gov.uk/media/5a7c35bbed915d76e2ebbd13/20130524_mod_gmpp_data.csv", + "release": "2012-13 annual-report release (published 2013)" + }, + "current": { + "publication": "https://www.gov.uk/government/publications/major-projects-authority-annual-report-2014", + "csv": "https://assets.publishing.service.gov.uk/media/5a7ea47a40f0b62305b823ee/Government_Major_Projects_Portfolio_data__September_2013__CSV_.csv", + "release": "2013-14 annual-report release (published 2014)" + } + }, + "label": "no-move", + "why": "The published end date is identical. The complete schedule narrative says \"No change\" and names no different current end date." + }, + { + "id": "PLH4-B25", + "project": "Court Estates Reform", + "department": "MOJ", + "prevYear": 2013, + "year": 2014, + "prevEnd": "2014-09-30", + "curEnd": "2014-09-30", + "daysMoved": 0, + "narrative": "There are two closures remaining before the programme closes in September 2014. ", + "source": { + "previous": { + "publication": "https://www.gov.uk/government/publications/government-major-projects-portfolio-data-for-moj-2013--2", + "csv": "https://assets.publishing.service.gov.uk/media/5a7b88a5ed915d4147620fed/gmpp-data-MoJ-q2-2012-13.csv", + "release": "2012-13 annual-report release (published 2013)" + }, + "current": { + "publication": "https://www.gov.uk/government/publications/major-projects-authority-annual-report-2014", + "csv": "https://assets.publishing.service.gov.uk/media/5a7ea47a40f0b62305b823ee/Government_Major_Projects_Portfolio_data__September_2013__CSV_.csv", + "release": "2013-14 annual-report release (published 2014)" + } + }, + "label": "no-move", + "why": "Both releases publish 30 September 2014. The narrative says the programme closes in September 2014, consistent with that date at month precision." + }, + { + "id": "PLH4-B26", + "project": "National Offender Management Information Systems (NOMIS) Programme", + "department": "MoJ", + "prevYear": 2013, + "year": 2014, + "prevEnd": "2013-10-31", + "curEnd": "2013-10-31", + "daysMoved": 0, + "narrative": "Delivered on schedule", + "source": { + "previous": { + "publication": "https://www.gov.uk/government/publications/government-major-projects-portfolio-data-for-moj-2013--2", + "csv": "https://assets.publishing.service.gov.uk/media/5a7b88a5ed915d4147620fed/gmpp-data-MoJ-q2-2012-13.csv", + "release": "2012-13 annual-report release (published 2013)" + }, + "current": { + "publication": "https://www.gov.uk/government/publications/major-projects-authority-annual-report-2014", + "csv": "https://assets.publishing.service.gov.uk/media/5a7ea47a40f0b62305b823ee/Government_Major_Projects_Portfolio_data__September_2013__CSV_.csv", + "release": "2013-14 annual-report release (published 2014)" + } + }, + "label": "no-move", + "why": "The published end date is identical. The narrative says \"Delivered on schedule\" and names no different current end date." + }, + { + "id": "PLH4-B27", + "project": "Further Education 24+ Learning Loans Programme", + "department": "BIS", + "prevYear": 2014, + "year": 2015, + "prevEnd": "2013-10-31", + "curEnd": "2013-10-31", + "daysMoved": 0, + "narrative": "The project was closed in October 2013 as planned and is now in Business as Usual running and a Gate 5 review is being planned.", + "source": { + "previous": { + "publication": "https://www.gov.uk/government/publications/major-projects-authority-annual-report-2014", + "csv": "https://assets.publishing.service.gov.uk/media/5a7ea47a40f0b62305b823ee/Government_Major_Projects_Portfolio_data__September_2013__CSV_.csv", + "release": "2013-14 annual-report release (published 2014)" + }, + "current": { + "publication": "https://www.gov.uk/government/publications/major-projects-authority-annual-report-2015", + "csv": "https://assets.publishing.service.gov.uk/media/5a801db6ed915d74e33f88a0/GMPP_data_september_2014.csv", + "release": "2014-15 annual-report release (published 2015)" + } + }, + "label": "no-move", + "why": "Both releases publish 31 October 2013. The narrative says the project closed in October 2013 as planned, consistent with that date at month precision." + }, + { + "id": "PLH4-B28", + "project": "National Cyber Security Programme", + "department": "CO", + "prevYear": 2014, + "year": 2015, + "prevEnd": "2016-04-01", + "curEnd": "2016-04-01", + "daysMoved": 0, + "narrative": "The Programme is still scheduled to complete on 01/04/2016", + "source": { + "previous": { + "publication": "https://www.gov.uk/government/publications/major-projects-authority-annual-report-2014", + "csv": "https://assets.publishing.service.gov.uk/media/5a7ea47a40f0b62305b823ee/Government_Major_Projects_Portfolio_data__September_2013__CSV_.csv", + "release": "2013-14 annual-report release (published 2014)" + }, + "current": { + "publication": "https://www.gov.uk/government/publications/major-projects-authority-annual-report-2015", + "csv": "https://assets.publishing.service.gov.uk/media/5a801db6ed915d74e33f88a0/GMPP_data_september_2014.csv", + "release": "2014-15 annual-report release (published 2015)" + } + }, + "label": "no-move", + "why": "Both releases publish 1 April 2016. The narrative explicitly says the programme is still scheduled to complete on that date." + }, + { + "id": "PLH4-B29", + "project": "Central Payment System", + "department": "DWP", + "prevYear": 2013, + "year": 2014, + "prevEnd": "2012-06-21", + "curEnd": "2012-06-21", + "daysMoved": 0, + "narrative": "Final Programme closure took place in August 2012 following a full and effective handover to DWP Finance teams responsible for managing the system in a “business as usual” environment.", + "source": { + "previous": { + "publication": "https://www.gov.uk/government/publications/government-major-projects-portfolio-data-for-dwp-2013", + "csv": "https://assets.publishing.service.gov.uk/media/5a74b963ed915d502d6ca79b/gmpp-data-DWP-q2-2012-13.csv", + "release": "2012-13 annual-report release (published 2013)" + }, + "current": { + "publication": "https://www.gov.uk/government/publications/major-projects-authority-annual-report-2014", + "csv": "https://assets.publishing.service.gov.uk/media/5a7ea47a40f0b62305b823ee/Government_Major_Projects_Portfolio_data__September_2013__CSV_.csv", + "release": "2013-14 annual-report release (published 2014)" + } + }, + "label": "published-date-check", + "why": "Both releases publish 21 June 2012. The narrative explicitly places final programme closure in August 2012; even 1 August is 41 days later than the published date." + }, + { + "id": "PLH4-B30", + "project": "Procurement Transformation Programme", + "department": "DHSC", + "prevYear": 2018, + "year": 2019, + "prevEnd": "2019-03-31", + "curEnd": "2019-03-31", + "daysMoved": 0, + "narrative": "While the date of 31/03/2019 represents the date the key changes went live, since Q2 it has been agreed that the programme will not close down until 20/12/2019. This is due to remaining risks which will need to be actively managed due to EU exit preparation work and operational freeze periods as well as in-year financial pressures which resulted in some non-critical elements of the planned work to be delayed into FY 19/20. These will need to be put into place to fully realise NHS Supply Chain", + "source": { + "previous": { + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2018", + "csv": "https://assets.publishing.service.gov.uk/media/5b3e2e2340f0b678bc5d018c/csv-ipa-government-major-projects-portfolio-data-september-2017.csv", + "release": "2017-18 annual-report release (published 2018)" + }, + "current": { + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2019", + "csv": "https://assets.publishing.service.gov.uk/media/5d2dd08d40f0b64a8626b762/Annual_Report_on_Major_Projects_2018_to_2019__consolidated_data_and_narratives.csv", + "release": "2018-19 annual-report release (published 2019)" + } + }, + "label": "published-date-check", + "why": "Both releases publish 31 March 2019. The narrative explicitly distinguishes that go-live date from programme closure on 20 December 2019, 264 days later." + } + ] +} diff --git a/bench/real-cases/projectlens-heldout5.json b/bench/real-cases/projectlens-heldout5.json new file mode 100644 index 0000000..28e358a --- /dev/null +++ b/bench/real-cases/projectlens-heldout5.json @@ -0,0 +1,1553 @@ +{ + "meta": { + "name": "ProjectLens independent held-out set 5", + "caseCount": 40, + "uniqueProjects": 40, + "licence": "Open Government Licence v3.0 for source data and verbatim government narratives; independently authored labels and explanations.", + "yearConvention": "prevYear/year are annual-report release years. Source release fields name the financial-year releases. Older releases generally report the preceding September; the 2021 release compares against the September 2019 snapshot published in 2020.", + "narrative": "Complete current-release schedule cell, with original spelling, punctuation and whitespace. No paraphrases, generated variants or invented dates.", + "labelling": "C2 rules. Explicitly stated end-date movements are explained. A moved date with an unchanged/on-track claim or an unexplained conflicting current end date is a contradiction. Equal dates are no-move unless the commentary names a different current end/closure date, in which case published-date-check.", + "independence": "No tool implementation, tests or engine files read. Neither tool was run. Prior bench JSON and input data read only to identify exclusions and the required format.", + "exclusion": "Excludes every matched prior project name and GMPP ID from sets 1–4 and the allowed input directories. Matching propagates known ID/name links across releases; historical renames used in selected pairs are documented in matchedBy.", + "labelCounts": { + "contradiction": 10, + "explained": 18, + "no-move": 8, + "published-date-check": 4 + }, + "doubtfulLabels": [ + "PLH5-B02", + "PLH5-B05", + "PLH5-B09", + "PLH5-B10", + "PLH5-B40" + ] + }, + "cases": [ + { + "id": "PLH5-B01", + "gmppId": null, + "project": "Broadband Delivery Programme", + "department": "DCMS", + "prevYear": 2013, + "year": 2014, + "prevEnd": "2015-03-31", + "curEnd": "2016-12-31", + "daysMoved": 641, + "narrative": "On schedule (as of September 2013)", + "label": "contradiction", + "why": "The published end moves from 31 March 2015 to 31 December 2016, while the entire schedule narrative says \"On schedule (as of September 2013)\" and states no move.", + "source": { + "previous": { + "release": "2012-13", + "publication": "https://www.gov.uk/government/publications/government-major-projects-portfolio-data-for-dcms-2013", + "csv": "https://assets.publishing.service.gov.uk/media/5a7bffe7ed915d01ba1ca7f4/gmpp-data-DCMS-q2-2012-13.csv", + "sha256": "f2cc82bfb9f0ac3654c8da984793b77184a92e0d156eaf93bccb2c1efc4402cc", + "projectColumn": 3, + "projectRecord": null, + "narrativeField": "Departmental narrative on schedule, including any deviation from planned schedule (if necessary)" + }, + "current": { + "release": "2013-14", + "publication": "https://www.gov.uk/government/publications/major-projects-authority-annual-report-2014", + "csv": "https://assets.publishing.service.gov.uk/media/5a7ea47a40f0b62305b823ee/Government_Major_Projects_Portfolio_data__September_2013__CSV_.csv", + "sha256": "67cb811e8bf3f807ecee8cf177e36036bb6c0810a7c6f4077364cfebabb302a1", + "projectColumn": 25, + "projectRecord": null, + "narrativeField": "Departmental narrative on schedule, including any deviation from planned schedule (if necessary)" + } + }, + "prevProject": "Broadband Delivery Programme", + "prevEndAsPublished": "31/03/2015", + "curEndAsPublished": "31/12/2016", + "matchedBy": "unique project name normalised for case, spacing and punctuation, with the same department" + }, + { + "id": "PLH5-B02", + "gmppId": null, + "project": "Government Hubs Programme", + "department": "CO", + "prevYear": 2018, + "year": 2019, + "prevEnd": "2025-03-31", + "curEnd": "2036-03-31", + "daysMoved": 4018, + "narrative": "Programme as a whole remains on schedule with individual project timelines and programme tranche timelines shifting in line with emerging priorities and challenges.", + "label": "contradiction", + "why": "The published programme end moves from March 2025 to March 2036. The narrative says the programme as a whole remains on schedule. It mentions individual and tranche timelines shifting, without stating this programme-end extension.", + "source": { + "previous": { + "release": "2017-18", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2018", + "csv": "https://assets.publishing.service.gov.uk/media/5b3e2e2340f0b678bc5d018c/csv-ipa-government-major-projects-portfolio-data-september-2017.csv", + "sha256": "915cf52ff57a180c9f3989e9e29e56594efd81da1e66fa3757d66a145b71f726", + "projectColumn": 16, + "projectRecord": null, + "narrativeField": "Departmental narrative on schedule, including any deviation from planned schedule (if necessary)" + }, + "current": { + "release": "2018-19", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2019", + "csv": "https://assets.publishing.service.gov.uk/media/5d2dd08d40f0b64a8626b762/Annual_Report_on_Major_Projects_2018_to_2019__consolidated_data_and_narratives.csv", + "sha256": "c22caa602ec3a7d9cc64cb20d559dbd5dbd0b9ceae5b4184675f247138d5b8b8", + "projectColumn": 17, + "projectRecord": null, + "narrativeField": "Departmental narrative on schedule, including any deviation from planned schedule (if necessary)" + } + }, + "prevProject": "Government Hubs Programme", + "prevEndAsPublished": "31/03/25", + "curEndAsPublished": "31/03/2036", + "matchedBy": "unique project name normalised for case, spacing and punctuation, with the same department", + "labelCaveat": "The narrative acknowledges individual and tranche movements. The label applies the C2 rule to its explicit programme-wide on-schedule claim and unstated programme-end extension." + }, + { + "id": "PLH5-B03", + "gmppId": null, + "project": "Commercial Capability Programme", + "department": "CO", + "prevYear": 2016, + "year": 2017, + "prevEnd": "2017-03-31", + "curEnd": "2018-03-31", + "daysMoved": 365, + "narrative": "On track to deliver key enablers within current scope", + "label": "contradiction", + "why": "The published end moves one year later, from 31 March 2017 to 31 March 2018. The narrative says it is on track within current scope and states no end-date move.", + "source": { + "previous": { + "release": "2015-16", + "publication": "https://www.gov.uk/government/news/ipa-annual-report-on-major-government-projects-shows-improvements", + "csv": "https://assets.publishing.service.gov.uk/media/5a80a49ce5274a2e8ab51547/government_major_projects_portfolio_data_september_2015.csv", + "sha256": "c03928d2b93b02065869fb225a61ad88a44a1328c971a4c58e88349a74a32937", + "projectColumn": 7, + "projectRecord": null, + "narrativeField": "Departmental narrative on schedule, including any deviation from planned schedule (if necessary)" + }, + "current": { + "release": "2016-17", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2017", + "csv": "https://assets.publishing.service.gov.uk/media/5a821ed6e5274a2e8ab57995/Annual_Report_-_consolidated_data_and_narratives.csv", + "sha256": "1dc7c1598ab6955d5a1a704117b239350aef956b4b5aa141facaaadd331c6238", + "projectColumn": 12, + "projectRecord": null, + "narrativeField": "Departmental narrative on schedule, including any deviation from planned schedule (if necessary)" + } + }, + "prevProject": "Commercial Capability Programme", + "prevEndAsPublished": "31/03/2017", + "curEndAsPublished": "31/03/2018", + "matchedBy": "unique project name normalised for case, spacing and punctuation, with the same department" + }, + { + "id": "PLH5-B04", + "gmppId": null, + "project": "Foxhound Programme", + "department": "CO", + "prevYear": 2017, + "year": 2018, + "prevEnd": "2018-07-01", + "curEnd": "2018-12-31", + "daysMoved": 183, + "narrative": "The Programme has continued to make good progress with all core components of the system now underway and in the delivery pipeline. The Programme has now implemented the system to its Full Business Case partners as well as consuming a number of new Brexit-driven Partners. The overall risks around technology development timelines continues to reduce but challenges remain around enhanced roll-out to multiple new partners to time. The Programme agreed with the IPA in autumn 2017 that end March 2019 is an achievable target date for Programme closure. \r\rThe Service Organisation is well established and is increasingly picking up work transitioning from the Programme. The Target Operating Model aims to deliver significant Programme transition to the DfID organisation managing the Service through 2018. ", + "label": "contradiction", + "why": "The published end moves from 1 July to 31 December 2018. The narrative instead names end March 2019 as the achievable programme-closure target, at least 90 days beyond the published end, without explaining the published move.", + "source": { + "previous": { + "release": "2016-17", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2017", + "csv": "https://assets.publishing.service.gov.uk/media/5a821ed6e5274a2e8ab57995/Annual_Report_-_consolidated_data_and_narratives.csv", + "sha256": "1dc7c1598ab6955d5a1a704117b239350aef956b4b5aa141facaaadd331c6238", + "projectColumn": 13, + "projectRecord": null, + "narrativeField": "Departmental narrative on schedule, including any deviation from planned schedule (if necessary)" + }, + "current": { + "release": "2017-18", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2018", + "csv": "https://assets.publishing.service.gov.uk/media/5b3e2e2340f0b678bc5d018c/csv-ipa-government-major-projects-portfolio-data-september-2017.csv", + "sha256": "915cf52ff57a180c9f3989e9e29e56594efd81da1e66fa3757d66a145b71f726", + "projectColumn": 13, + "projectRecord": null, + "narrativeField": "Departmental narrative on schedule, including any deviation from planned schedule (if necessary)" + } + }, + "prevProject": "FOXHOUND Programme", + "prevEndAsPublished": "01/07/2018", + "curEndAsPublished": "31/12/18", + "matchedBy": "unique project name normalised for case, spacing and punctuation, with the same department" + }, + { + "id": "PLH5-B05", + "gmppId": null, + "project": "National Crime Agency (NCA)", + "department": "HO", + "prevYear": 2013, + "year": 2014, + "prevEnd": "2013-10-01", + "curEnd": "2014-03-31", + "daysMoved": 181, + "narrative": " The NCA Programme has now closed following its successful launch and having delivered to schedule.  ", + "label": "contradiction", + "why": "The published end moves from 1 October 2013 to 31 March 2014. The narrative says the programme closed having delivered to schedule, without stating the end-date movement.", + "source": { + "previous": { + "release": "2012-13", + "publication": "https://www.gov.uk/government/publications/home-office-major-projects-portfolio-data-2013", + "csv": "https://assets.publishing.service.gov.uk/media/5a74f33c40f0b6399b2af792/HO_Major_projects.csv", + "sha256": "a6cd77f80e244d21121701703af1942a0c391871d03f5a51699ccebf556af5d8", + "projectColumn": 15, + "projectRecord": null, + "narrativeField": "Departmental narrative on schedule, including any deviation from planned schedule (if necessary)" + }, + "current": { + "release": "2013-14", + "publication": "https://www.gov.uk/government/publications/major-projects-authority-annual-report-2014", + "csv": "https://assets.publishing.service.gov.uk/media/5a7ea47a40f0b62305b823ee/Government_Major_Projects_Portfolio_data__September_2013__CSV_.csv", + "sha256": "67cb811e8bf3f807ecee8cf177e36036bb6c0810a7c6f4077364cfebabb302a1", + "projectColumn": 127, + "projectRecord": null, + "narrativeField": "Departmental narrative on schedule, including any deviation from planned schedule (if necessary)" + } + }, + "prevProject": "National Crime Agency (NCA)", + "prevEndAsPublished": "01/10/2013", + "curEndAsPublished": "31/03/2014", + "matchedBy": "unique project name normalised for case, spacing and punctuation, with the same department", + "labelCaveat": "The successful launch and formal programme closure can be different milestones. This label follows the C2 rule for an unqualified delivered-to-schedule claim; it is not an allegation of late operational launch." + }, + { + "id": "PLH5-B06", + "gmppId": null, + "project": "Transforming the Customer Experience (Formerly A&E)", + "department": "HO", + "prevYear": 2013, + "year": 2014, + "prevEnd": "2012-03-31", + "curEnd": "2014-11-01", + "daysMoved": 945, + "narrative": "The programme is on track to deliver as scheduled.", + "label": "contradiction", + "why": "The published end moves from 31 March 2012 to 1 November 2014, while the narrative says the programme is on track to deliver as scheduled and states no move.", + "source": { + "previous": { + "release": "2012-13", + "publication": "https://www.gov.uk/government/publications/home-office-major-projects-portfolio-data-2013", + "csv": "https://assets.publishing.service.gov.uk/media/5a74f33c40f0b6399b2af792/HO_Major_projects.csv", + "sha256": "a6cd77f80e244d21121701703af1942a0c391871d03f5a51699ccebf556af5d8", + "projectColumn": 18, + "projectRecord": null, + "narrativeField": "Departmental narrative on schedule, including any deviation from planned schedule (if necessary)" + }, + "current": { + "release": "2013-14", + "publication": "https://www.gov.uk/government/publications/major-projects-authority-annual-report-2014", + "csv": "https://assets.publishing.service.gov.uk/media/5a7ea47a40f0b62305b823ee/Government_Major_Projects_Portfolio_data__September_2013__CSV_.csv", + "sha256": "67cb811e8bf3f807ecee8cf177e36036bb6c0810a7c6f4077364cfebabb302a1", + "projectColumn": 131, + "projectRecord": null, + "narrativeField": "Departmental narrative on schedule, including any deviation from planned schedule (if necessary)" + } + }, + "prevProject": "Transforming the Customer Experience", + "prevEndAsPublished": "31/03/2012", + "curEndAsPublished": "01/11/2014", + "matchedBy": "Historic rename: the distinctive Transforming the Customer Experience title is retained with a parenthetical Formerly A&E suffix, within HO. The 2013/2014 descriptions identify the same passport-application system replacement. This completed historic project is distinct from the later Passport Transformation Programme, GMPP ID HO_0044_2021-Q4, which is excluded." + }, + { + "id": "PLH5-B07", + "gmppId": null, + "project": "HMCTS Compliance & Enforcement Services Project", + "department": "MOJ", + "prevYear": 2013, + "year": 2014, + "prevEnd": "2014-02-01", + "curEnd": "2015-07-31", + "daysMoved": 545, + "narrative": "There is no deviation from the planned schedule. The project team is continually assessing the project delivery plan with the aim to pursue the most ambitious timeline. ", + "label": "contradiction", + "why": "The published end moves from 1 February 2014 to 31 July 2015. The narrative explicitly says there is no deviation from the planned schedule and states no move.", + "source": { + "previous": { + "release": "2012-13", + "publication": "https://www.gov.uk/government/publications/government-major-projects-portfolio-data-for-moj-2013--2", + "csv": "https://assets.publishing.service.gov.uk/media/5a7b88a5ed915d4147620fed/gmpp-data-MoJ-q2-2012-13.csv", + "sha256": "99508c923a01dd8be3cd58df5e24bf7ba296eea54b22d2da25c44005b13aa4d7", + "projectColumn": 13, + "projectRecord": null, + "narrativeField": "Departmental narrative on schedule, including any deviation from planned schedule (if necessary)" + }, + "current": { + "release": "2013-14", + "publication": "https://www.gov.uk/government/publications/major-projects-authority-annual-report-2014", + "csv": "https://assets.publishing.service.gov.uk/media/5a7ea47a40f0b62305b823ee/Government_Major_Projects_Portfolio_data__September_2013__CSV_.csv", + "sha256": "67cb811e8bf3f807ecee8cf177e36036bb6c0810a7c6f4077364cfebabb302a1", + "projectColumn": 180, + "projectRecord": null, + "narrativeField": "Departmental narrative on schedule, including any deviation from planned schedule (if necessary)" + } + }, + "prevProject": "Court Fines Compliance & Enforcement Project", + "prevEndAsPublished": "01/02/2014", + "curEndAsPublished": "31/07/2015", + "matchedBy": "Historic rename, MoJ: both published descriptions call this the Compliance & Enforcement Services project, delivering the Criminal Compliance & Enforcement Blueprint within HMCTS. This is the standalone compliance/enforcement procurement, not the later HMCTS Reform programme." + }, + { + "id": "PLH5-B08", + "gmppId": null, + "project": "Electronic Data Collection", + "department": "ONS", + "prevYear": 2014, + "year": 2015, + "prevEnd": "2024-03-31", + "curEnd": "2019-11-01", + "daysMoved": -1612, + "narrative": "Schedule on track, with the build of the application progressing according to plan. \nThe technical platform release to support the Monthly Wages and Salaries Surveys pilot went live on 5 September, as planned. ", + "label": "contradiction", + "why": "The published end moves from 31 March 2024 to 1 November 2019. The narrative says \"Schedule on track\" and states no shortening.", + "source": { + "previous": { + "release": "2013-14", + "publication": "https://www.gov.uk/government/publications/major-projects-authority-annual-report-2014", + "csv": "https://assets.publishing.service.gov.uk/media/5a7ea47a40f0b62305b823ee/Government_Major_Projects_Portfolio_data__September_2013__CSV_.csv", + "sha256": "67cb811e8bf3f807ecee8cf177e36036bb6c0810a7c6f4077364cfebabb302a1", + "projectColumn": 198, + "projectRecord": null, + "narrativeField": "Departmental narrative on schedule, including any deviation from planned schedule (if necessary)" + }, + "current": { + "release": "2014-15", + "publication": "https://www.gov.uk/government/publications/major-projects-authority-annual-report-2015", + "csv": "https://assets.publishing.service.gov.uk/media/5a801db6ed915d74e33f88a0/GMPP_data_september_2014.csv", + "sha256": "addde3f42fb6e4408c30e62d8cf3bf32eb5267d10802e13b3718faf051aef117", + "projectColumn": 187, + "projectRecord": null, + "narrativeField": "Departmental narrative on schedule, including any deviation from planned schedule (if necessary)" + } + }, + "prevProject": "Electronic Data Collection (EDC)", + "prevEndAsPublished": "31/03/2024", + "curEndAsPublished": "01/11/2019", + "matchedBy": "Same ONS project, with only the EDC acronym removed. Both descriptions concern systems, methods and processes for collection, integration, processing and analysis of survey/economic data." + }, + { + "id": "PLH5-B09", + "gmppId": null, + "project": "E&N Herts NHS Trust - Lister Hospital ('Our Changing Hospitals' Phase 4 Programme)", + "department": "DOH", + "prevYear": 2013, + "year": 2014, + "prevEnd": "2014-01-17", + "curEnd": "2014-03-17", + "daysMoved": 59, + "narrative": "The programme is currently on timetable to deliver consolidation as planned in October 2014.", + "label": "contradiction", + "why": "The published end moves from 17 January to 17 March 2014. The narrative says the programme is on timetable to deliver consolidation as planned in October 2014, over six months after the published end, without stating the published movement.", + "source": { + "previous": { + "release": "2012-13", + "publication": "https://www.gov.uk/government/publications/government-major-projects-portfolio-data-for-department-of-health-2013--2", + "csv": "https://assets.publishing.service.gov.uk/media/5a7cab85ed915d6969f46841/gmpp-data-DH-q2-2012-13.csv", + "sha256": "f631a2722cf4dbd3a8df742701cd21d8295297441e2f5af3ddfb458e9a359d33", + "projectColumn": 4, + "projectRecord": null, + "narrativeField": "Departmental narrative on schedule, including any deviation from planned schedule (if necessary)" + }, + "current": { + "release": "2013-14", + "publication": "https://www.gov.uk/government/publications/major-projects-authority-annual-report-2014", + "csv": "https://assets.publishing.service.gov.uk/media/5a7ea47a40f0b62305b823ee/Government_Major_Projects_Portfolio_data__September_2013__CSV_.csv", + "sha256": "67cb811e8bf3f807ecee8cf177e36036bb6c0810a7c6f4077364cfebabb302a1", + "projectColumn": 68, + "projectRecord": null, + "narrativeField": "Departmental narrative on schedule, including any deviation from planned schedule (if necessary)" + } + }, + "prevProject": "E & N Herts NHS Trust - Lister Hospital ('Our Changing Hospitals' Phase 4 Programme)", + "prevEndAsPublished": "17/01/2014", + "curEndAsPublished": "17/03/2014", + "matchedBy": "unique project name normalised for case, spacing and punctuation, with the same department", + "labelCaveat": "Consolidation is the named delivery outcome, rather than an explicit formal-closure date. The commentary and published end require interpretation of that scope; the label treats consolidation as the programme delivery finish." + }, + { + "id": "PLH5-B10", + "gmppId": null, + "project": "The Materiel Strategy", + "department": "MOD", + "prevYear": 2014, + "year": 2015, + "prevEnd": "2016-04-01", + "curEnd": "2017-05-31", + "daysMoved": 425, + "narrative": "DE&S was established as a bespoke trading entity in April 2014. Managed Service Providers are under contract to support DE&S in developing plans to reach a ‘match fit’ end-state. The process of transformational change is to deliver a ‘match fit’ DE&S by April 2017.\n\n", + "label": "contradiction", + "why": "The published end moves from 1 April 2016 to 31 May 2017. The narrative instead targets the transformational match-fit end-state by April 2017. Even 30 April is 31 days before the published end, and the narrative does not state the published movement.", + "source": { + "previous": { + "release": "2013-14", + "publication": "https://www.gov.uk/government/publications/major-projects-authority-annual-report-2014", + "csv": "https://assets.publishing.service.gov.uk/media/5a7ea47a40f0b62305b823ee/Government_Major_Projects_Portfolio_data__September_2013__CSV_.csv", + "sha256": "67cb811e8bf3f807ecee8cf177e36036bb6c0810a7c6f4077364cfebabb302a1", + "projectColumn": 150, + "projectRecord": null, + "narrativeField": "Departmental narrative on schedule, including any deviation from planned schedule (if necessary)" + }, + "current": { + "release": "2014-15", + "publication": "https://www.gov.uk/government/publications/major-projects-authority-annual-report-2015", + "csv": "https://assets.publishing.service.gov.uk/media/5a801db6ed915d74e33f88a0/GMPP_data_september_2014.csv", + "sha256": "addde3f42fb6e4408c30e62d8cf3bf32eb5267d10802e13b3718faf051aef117", + "projectColumn": 157, + "projectRecord": null, + "narrativeField": "Departmental narrative on schedule, including any deviation from planned schedule (if necessary)" + } + }, + "prevProject": "The Material Strategy", + "prevEndAsPublished": "01/04/2016", + "curEndAsPublished": "31/05/2017", + "matchedBy": "Same MOD Defence Equipment & Support transformation programme. Material/Materiel is a spelling variation in successive published titles; both descriptions identify DE&S and the same match-fit transformation.", + "labelCaveat": "The match-fit transformation end-state may precede administrative or supplier-contract closure. This label follows C2 by treating the stated transformation completion as the current programme finish; the scope distinction is uncertain." + }, + { + "id": "PLH5-B11", + "gmppId": "BEIS_0007_2021-Q3", + "project": "REPLACEMENT ANALYTICAL PROJECT", + "department": "DESNZ", + "prevYear": 2024, + "year": 2025, + "prevEnd": "2028-07-10", + "curEnd": "2032-10-30", + "daysMoved": 1573, + "narrative": "Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 10/07/2028 to 30/10/2032. This is primarily due to the following factors‚\nAs a result of the strategic decision to pause the project, a deferral has been implemented with the forecast project end date aligned to this. However, this is subject to a pending a decision on the final project close out. ", + "label": "explained", + "why": "The narrative states the increase to October 2032 and explains the strategic pause and associated deferral. The pending final-close-out decision is disclosed.", + "source": { + "previous": { + "release": "2023-24", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24", + "csv": "https://assets.publishing.service.gov.uk/media/6787e8ee1124a2c3ceb646be/Government_Major_Projects_Portofolio_AR_Data_March_2024.csv", + "sha256": "29596242964ff850351b9d091ae7db2584e1c8cdec3b7c8e53ca661479db614b", + "projectColumn": null, + "projectRecord": 18, + "narrativeField": "Departmental narrative on schedule, including any deviation from planned schedule (if necessary)" + }, + "current": { + "release": "2024-25", + "publication": "https://www.gov.uk/government/publications/nista-annual-report-2024-2025", + "csv": "https://assets.publishing.service.gov.uk/media/6895fbb63080e72710b2e2ef/nista_annual_report_data_2425.csv", + "sha256": "cac14ed4e6a90a81486bdc24295ea40996e7fd6fcd3834e3ffad8a2685f8c8b3", + "projectColumn": null, + "projectRecord": 30, + "narrativeField": "Schedule Narrative" + } + }, + "prevProject": "Replacement Analytical Project", + "prevEndAsPublished": "2028-07-10 00:00:00", + "curEndAsPublished": "30/10/2032", + "matchedBy": "same GMPP ID in both releases" + }, + { + "id": "PLH5-B12", + "gmppId": "DESNZ_0295_2324-Q3", + "project": "Home Upgrade Grant and Local Authority Delivery (HULA) schemes", + "department": "DESNZ", + "prevYear": 2024, + "year": 2025, + "prevEnd": "2025-03-31", + "curEnd": "2025-09-01", + "daysMoved": 154, + "narrative": "Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2025 to 01/09/2025. This is primarily due to the following factors:\nDelivery ended on 30 March 2025. HUG2 project closure activity is underway with the final IPA review expected in September 2025. HULA will exit GMPP with HUG2 at this time and therefore the Q2 report (data date end September 2024 will be the last) ", + "label": "explained", + "why": "The narrative explicitly gives the move from March to September 2025 and distinguishes ended delivery from remaining HUG2 closure and review activity.", + "source": { + "previous": { + "release": "2023-24", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24", + "csv": "https://assets.publishing.service.gov.uk/media/6787e8ee1124a2c3ceb646be/Government_Major_Projects_Portofolio_AR_Data_March_2024.csv", + "sha256": "29596242964ff850351b9d091ae7db2584e1c8cdec3b7c8e53ca661479db614b", + "projectColumn": null, + "projectRecord": 13, + "narrativeField": "Departmental narrative on schedule, including any deviation from planned schedule (if necessary)" + }, + "current": { + "release": "2024-25", + "publication": "https://www.gov.uk/government/publications/nista-annual-report-2024-2025", + "csv": "https://assets.publishing.service.gov.uk/media/6895fbb63080e72710b2e2ef/nista_annual_report_data_2425.csv", + "sha256": "cac14ed4e6a90a81486bdc24295ea40996e7fd6fcd3834e3ffad8a2685f8c8b3", + "projectColumn": null, + "projectRecord": 43, + "narrativeField": "Schedule Narrative" + } + }, + "prevProject": "Home Upgrade Grant and Local Authority Delivery (HULA) schemes", + "prevEndAsPublished": "2025-03-31 00:00:00", + "curEndAsPublished": "01/09/2025", + "matchedBy": "same GMPP ID in both releases" + }, + { + "id": "PLH5-B13", + "gmppId": "DFE_0020_2021-Q4", + "project": "NATIONAL TUTORING PROGRAMME", + "department": "DFE", + "prevYear": 2024, + "year": 2025, + "prevEnd": "2024-07-31", + "curEnd": "2025-03-31", + "daysMoved": 243, + "narrative": "Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/07/2024 to 31/03/2025. This is primarily due to the following factors‚\nThe original project end date reflected the end of the NTP delivery in schools. In order to claw back unused funds from schools and close down, the project continued until 31/03/25.", + "label": "explained", + "why": "The narrative explicitly gives the move from July 2024 to March 2025 and explains fund recovery and close-down work after delivery in schools.", + "source": { + "previous": { + "release": "2023-24", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24", + "csv": "https://assets.publishing.service.gov.uk/media/6787e8ee1124a2c3ceb646be/Government_Major_Projects_Portofolio_AR_Data_March_2024.csv", + "sha256": "29596242964ff850351b9d091ae7db2584e1c8cdec3b7c8e53ca661479db614b", + "projectColumn": null, + "projectRecord": 32, + "narrativeField": "Departmental narrative on schedule, including any deviation from planned schedule (if necessary)" + }, + "current": { + "release": "2024-25", + "publication": "https://www.gov.uk/government/publications/nista-annual-report-2024-2025", + "csv": "https://assets.publishing.service.gov.uk/media/6895fbb63080e72710b2e2ef/nista_annual_report_data_2425.csv", + "sha256": "cac14ed4e6a90a81486bdc24295ea40996e7fd6fcd3834e3ffad8a2685f8c8b3", + "projectColumn": null, + "projectRecord": 79, + "narrativeField": "Schedule Narrative" + } + }, + "prevProject": "National Tutoring programme", + "prevEndAsPublished": "2024-07-31", + "curEndAsPublished": "31/03/2025", + "matchedBy": "same GMPP ID in both releases" + }, + { + "id": "PLH5-B14", + "gmppId": "HMRC_0159_2223-Q2", + "project": "SINGLE CUSTOMS PLATFORM", + "department": "HMRC", + "prevYear": 2024, + "year": 2025, + "prevEnd": "2025-03-31", + "curEnd": "2027-03-31", + "daysMoved": 730, + "narrative": "Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2025 to 31/03/2027. This is primarily due to the following factors‚\nSingle Customs Platform (SCP) has identified the need to reframe its programme delivery for a further 2 years, to ensure there is a sustainable Customs Declaration Service (CDS) in place, for the longer term. \n\nSCP needs to move from being a largely functional focus, that has existed to date, and create a need to invest in the CDS Service. The programme has performed an extensive prioritisation exercise to target outcome achievement. \n\nTo transition CDS to Business as Usual the programme needs to increase confidence of the CDS long-term ability to meet future requirements of HMRC, and broader HM Government border operations. ", + "label": "explained", + "why": "The narrative explicitly states the two-year extension to March 2027 and describes the additional work needed for a sustainable Customs Declaration Service.", + "source": { + "previous": { + "release": "2023-24", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24", + "csv": "https://assets.publishing.service.gov.uk/media/6787e8ee1124a2c3ceb646be/Government_Major_Projects_Portofolio_AR_Data_March_2024.csv", + "sha256": "29596242964ff850351b9d091ae7db2584e1c8cdec3b7c8e53ca661479db614b", + "projectColumn": null, + "projectRecord": 196, + "narrativeField": "Departmental narrative on schedule, including any deviation from planned schedule (if necessary)" + }, + "current": { + "release": "2024-25", + "publication": "https://www.gov.uk/government/publications/nista-annual-report-2024-2025", + "csv": "https://assets.publishing.service.gov.uk/media/6895fbb63080e72710b2e2ef/nista_annual_report_data_2425.csv", + "sha256": "cac14ed4e6a90a81486bdc24295ea40996e7fd6fcd3834e3ffad8a2685f8c8b3", + "projectColumn": null, + "projectRecord": 109, + "narrativeField": "Schedule Narrative" + } + }, + "prevProject": "Single Customs Platform", + "prevEndAsPublished": "2025-03-31", + "curEndAsPublished": "31/03/2027", + "matchedBy": "same GMPP ID in both releases" + }, + { + "id": "PLH5-B15", + "gmppId": "HO_0285_2324-Q2", + "project": "MANSTON TRANSFORMATION PROGRAMME", + "department": "HO", + "prevYear": 2024, + "year": 2025, + "prevEnd": "2027-11-05", + "curEnd": "2029-03-31", + "daysMoved": 512, + "narrative": "Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 05/11/2027 to 31/03/2029. This is primarily due to the following factors‚\nDue to the change in Government, this financial year, the Programme paused and revisited the scope and requirements from a value for money perspective. A Ministerial steer and decision was given to move forward with the revised scope and since then work has taken place to pivot the Programme. Design requirements and plans have been revisited and the delivery schedule has been re-baselined.", + "label": "explained", + "why": "The narrative explicitly states the extension to March 2029 and explains the pause, revised scope, changed designs and rebaselined delivery schedule.", + "source": { + "previous": { + "release": "2023-24", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24", + "csv": "https://assets.publishing.service.gov.uk/media/6787e8ee1124a2c3ceb646be/Government_Major_Projects_Portofolio_AR_Data_March_2024.csv", + "sha256": "29596242964ff850351b9d091ae7db2584e1c8cdec3b7c8e53ca661479db614b", + "projectColumn": null, + "projectRecord": 217, + "narrativeField": "Departmental narrative on schedule, including any deviation from planned schedule (if necessary)" + }, + "current": { + "release": "2024-25", + "publication": "https://www.gov.uk/government/publications/nista-annual-report-2024-2025", + "csv": "https://assets.publishing.service.gov.uk/media/6895fbb63080e72710b2e2ef/nista_annual_report_data_2425.csv", + "sha256": "cac14ed4e6a90a81486bdc24295ea40996e7fd6fcd3834e3ffad8a2685f8c8b3", + "projectColumn": null, + "projectRecord": 113, + "narrativeField": "Schedule Narrative" + } + }, + "prevProject": "Manston Transformation Programme", + "prevEndAsPublished": "2027-11-05", + "curEndAsPublished": "31/03/2029", + "matchedBy": "same GMPP ID in both releases" + }, + { + "id": "PLH5-B16", + "gmppId": "HO_0043_2021-Q4", + "project": "FUTURE SUPPLIERS SERVICES", + "department": "HO", + "prevYear": 2024, + "year": 2025, + "prevEnd": "2024-10-28", + "curEnd": "2025-05-30", + "daysMoved": 214, + "narrative": "Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 28/10/2024 to 30/05/2025. This is primarily due to the following factors‚\nThe conclusion of the Visa and Citizenship Application Service (VCAS) procurement was delayed due to a legal challenge to the procurement outcome by a bidder (which was later dropped). The Programme was expected to award contracts in July 2023, however the legal challenge put a suspension on the contract awards for three of the five contracts. FSS was able to award one contract in August 2023 and was successful in October 2023 in lifting the suspension of award in the remaining contracts. Once all five contracts had been awarded, the Programme worked closely with the new commercial partners at detailed implementation planning and revisited its delivery timelines, shifting Programme closure to March 2025. A Portfolio Change Request in July 2024 included an additional two months of Early Life Support resulting in Programme closure timelines extending to May 2025.", + "label": "explained", + "why": "The narrative explicitly gives the extension to May 2025 and describes procurement litigation, revised implementation planning and two months of early-life support.", + "source": { + "previous": { + "release": "2023-24", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24", + "csv": "https://assets.publishing.service.gov.uk/media/6787e8ee1124a2c3ceb646be/Government_Major_Projects_Portofolio_AR_Data_March_2024.csv", + "sha256": "29596242964ff850351b9d091ae7db2584e1c8cdec3b7c8e53ca661479db614b", + "projectColumn": null, + "projectRecord": 212, + "narrativeField": "Departmental narrative on schedule, including any deviation from planned schedule (if necessary)" + }, + "current": { + "release": "2024-25", + "publication": "https://www.gov.uk/government/publications/nista-annual-report-2024-2025", + "csv": "https://assets.publishing.service.gov.uk/media/6895fbb63080e72710b2e2ef/nista_annual_report_data_2425.csv", + "sha256": "cac14ed4e6a90a81486bdc24295ea40996e7fd6fcd3834e3ffad8a2685f8c8b3", + "projectColumn": null, + "projectRecord": 123, + "narrativeField": "Schedule Narrative" + } + }, + "prevProject": "Future Suppliers Services", + "prevEndAsPublished": "2024-10-28", + "curEndAsPublished": "30/05/2025", + "matchedBy": "same GMPP ID in both releases" + }, + { + "id": "PLH5-B17", + "gmppId": "MHCLG_0017_2122-Q2", + "project": "Levelling Up Fund", + "department": "MHCLG", + "prevYear": 2024, + "year": 2025, + "prevEnd": "2026-03-31", + "curEnd": "2028-03-31", + "daysMoved": 731, + "narrative": "Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2026 to 31/03/2028. This is primarily due to the following factors‚\nAutumn Statement 2024 agreed a reprofiling of c£1.bn for LUF projects beyond March 2026. Through the latest monitoring return, we allowed projects for the first time to extend spending profiles to 2027 for Round 1 projects and 2028 for Round 2 and 3 projects. These profiles (with optimism bias applied) have informed funding profiles for Spending Review phase 2. ", + "label": "explained", + "why": "The narrative explicitly gives the extension to March 2028 and explains the agreed reprofiling and later spending profiles for the fund rounds.", + "source": { + "previous": { + "release": "2023-24", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24", + "csv": "https://assets.publishing.service.gov.uk/media/6787e8ee1124a2c3ceb646be/Government_Major_Projects_Portofolio_AR_Data_March_2024.csv", + "sha256": "29596242964ff850351b9d091ae7db2584e1c8cdec3b7c8e53ca661479db614b", + "projectColumn": null, + "projectRecord": 177, + "narrativeField": "Departmental narrative on schedule, including any deviation from planned schedule (if necessary)" + }, + "current": { + "release": "2024-25", + "publication": "https://www.gov.uk/government/publications/nista-annual-report-2024-2025", + "csv": "https://assets.publishing.service.gov.uk/media/6895fbb63080e72710b2e2ef/nista_annual_report_data_2425.csv", + "sha256": "cac14ed4e6a90a81486bdc24295ea40996e7fd6fcd3834e3ffad8a2685f8c8b3", + "projectColumn": null, + "projectRecord": 142, + "narrativeField": "Schedule Narrative" + } + }, + "prevProject": "Levelling Up Fund", + "prevEndAsPublished": "2026-03-31", + "curEndAsPublished": "31/03/2028", + "matchedBy": "same GMPP ID in both releases" + }, + { + "id": "PLH5-B18", + "gmppId": "DFE_0016_2021-Q3", + "project": "Institutes of Technology (IoT) 2", + "department": "DFE", + "prevYear": 2023, + "year": 2024, + "prevEnd": "2026-01-01", + "curEnd": "2025-03-31", + "daysMoved": -276, + "narrative": "Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 decreased from 2026-01-01 to 2025-03-31. This is primarily due to the following factors. \n\n This end date is a correction from an error in previous returns which gave a project end date in 2026.", + "label": "explained", + "why": "The narrative explicitly states the shortening to March 2025 and identifies the previous 2026 date as a reporting error.", + "source": { + "previous": { + "release": "2022-23", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23", + "csv": "https://assets.publishing.service.gov.uk/media/64b79c5171749c001389ee41/GMPP_Government_Major_Projects_Portofolio_AR_Data_March_2023.csv", + "sha256": "ecd3756718a71e6f52fb25050caba535d64e7f5b21f6db361cfa10859a4364ac", + "projectColumn": null, + "projectRecord": 58, + "narrativeField": "Departmental narrative on schedule, including any deviation from planned schedule (if necessary)" + }, + "current": { + "release": "2023-24", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24", + "csv": "https://assets.publishing.service.gov.uk/media/6787e8ee1124a2c3ceb646be/Government_Major_Projects_Portofolio_AR_Data_March_2024.csv", + "sha256": "29596242964ff850351b9d091ae7db2584e1c8cdec3b7c8e53ca661479db614b", + "projectColumn": null, + "projectRecord": 30, + "narrativeField": "Departmental narrative on schedule, including any deviation from planned schedule (if necessary)" + } + }, + "prevProject": "Institutes of Technology (IoT) 2", + "prevEndAsPublished": "2026-01-01", + "curEndAsPublished": "2025-03-31", + "matchedBy": "same GMPP ID in both releases" + }, + { + "id": "PLH5-B19", + "gmppId": "MOJ_0054_2021-Q4", + "project": "Print Recompete", + "department": "MOJ", + "prevYear": 2023, + "year": 2024, + "prevEnd": "2023-12-30", + "curEnd": "2024-11-30", + "daysMoved": 336, + "narrative": "Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 increased from 2023-12-30 to 2024-11-30. This is primarily due to the following factors. \n\n The project has rebaselined its schedule following delays to device deployment.", + "label": "explained", + "why": "The narrative explicitly gives the extension to November 2024 and explains rebaselining following delayed device deployment.", + "source": { + "previous": { + "release": "2022-23", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23", + "csv": "https://assets.publishing.service.gov.uk/media/64b79c5171749c001389ee41/GMPP_Government_Major_Projects_Portofolio_AR_Data_March_2023.csv", + "sha256": "ecd3756718a71e6f52fb25050caba535d64e7f5b21f6db361cfa10859a4364ac", + "projectColumn": null, + "projectRecord": 233, + "narrativeField": "Departmental narrative on schedule, including any deviation from planned schedule (if necessary)" + }, + "current": { + "release": "2023-24", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24", + "csv": "https://assets.publishing.service.gov.uk/media/6787e8ee1124a2c3ceb646be/Government_Major_Projects_Portofolio_AR_Data_March_2024.csv", + "sha256": "29596242964ff850351b9d091ae7db2584e1c8cdec3b7c8e53ca661479db614b", + "projectColumn": null, + "projectRecord": 59, + "narrativeField": "Departmental narrative on schedule, including any deviation from planned schedule (if necessary)" + } + }, + "prevProject": "Print Recompete", + "prevEndAsPublished": "2023-12-30", + "curEndAsPublished": "2024-11-30", + "matchedBy": "same GMPP ID in both releases" + }, + { + "id": "PLH5-B20", + "gmppId": "MOJ_0055_2021-Q4", + "project": "Prison Retail", + "department": "MOJ", + "prevYear": 2023, + "year": 2024, + "prevEnd": "2023-06-30", + "curEnd": "2024-06-30", + "daysMoved": 366, + "narrative": "Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 increased from 2023-06-30 to 2024-06-30. This is primarily due to the following factors. \n\n The project has rebaselined its schedule mainly due to delays in supplier delivery.", + "label": "explained", + "why": "The narrative explicitly gives the extension to June 2024 and explains rebaselining due to supplier delays.", + "source": { + "previous": { + "release": "2022-23", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23", + "csv": "https://assets.publishing.service.gov.uk/media/64b79c5171749c001389ee41/GMPP_Government_Major_Projects_Portofolio_AR_Data_March_2023.csv", + "sha256": "ecd3756718a71e6f52fb25050caba535d64e7f5b21f6db361cfa10859a4364ac", + "projectColumn": null, + "projectRecord": 234, + "narrativeField": "Departmental narrative on schedule, including any deviation from planned schedule (if necessary)" + }, + "current": { + "release": "2023-24", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24", + "csv": "https://assets.publishing.service.gov.uk/media/6787e8ee1124a2c3ceb646be/Government_Major_Projects_Portofolio_AR_Data_March_2024.csv", + "sha256": "29596242964ff850351b9d091ae7db2584e1c8cdec3b7c8e53ca661479db614b", + "projectColumn": null, + "projectRecord": 60, + "narrativeField": "Departmental narrative on schedule, including any deviation from planned schedule (if necessary)" + } + }, + "prevProject": "Prison Retail", + "prevEndAsPublished": "2023-06-30", + "curEndAsPublished": "2024-06-30", + "matchedBy": "same GMPP ID in both releases" + }, + { + "id": "PLH5-B21", + "gmppId": "HMRC_0095_2122-Q4", + "project": "Pensions Programme", + "department": "HMRC", + "prevYear": 2023, + "year": 2024, + "prevEnd": "2027-03-31", + "curEnd": "2028-03-31", + "daysMoved": 366, + "narrative": "Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 increased from 2027-03-31 to 2028-03-31. This is primarily due to the following factors. \n\n The lifecycle of the programme was extended by one year to end 2027/28 to fully incorporate the Low Earners' Anomaly cost profile.", + "label": "explained", + "why": "The narrative explicitly states the one-year extension to March 2028 to include the Low Earners anomaly cost profile.", + "source": { + "previous": { + "release": "2022-23", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23", + "csv": "https://assets.publishing.service.gov.uk/media/64b79c5171749c001389ee41/GMPP_Government_Major_Projects_Portofolio_AR_Data_March_2023.csv", + "sha256": "ecd3756718a71e6f52fb25050caba535d64e7f5b21f6db361cfa10859a4364ac", + "projectColumn": null, + "projectRecord": 137, + "narrativeField": "Departmental narrative on schedule, including any deviation from planned schedule (if necessary)" + }, + "current": { + "release": "2023-24", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24", + "csv": "https://assets.publishing.service.gov.uk/media/6787e8ee1124a2c3ceb646be/Government_Major_Projects_Portofolio_AR_Data_March_2024.csv", + "sha256": "29596242964ff850351b9d091ae7db2584e1c8cdec3b7c8e53ca661479db614b", + "projectColumn": null, + "projectRecord": 193, + "narrativeField": "Departmental narrative on schedule, including any deviation from planned schedule (if necessary)" + } + }, + "prevProject": "Pensions Programme", + "prevEndAsPublished": "2027-03-31", + "curEndAsPublished": "2028-03-31", + "matchedBy": "same GMPP ID in both releases" + }, + { + "id": "PLH5-B22", + "gmppId": "DEFRA_0017_2122-Q1", + "project": "UK Seafood Fund", + "department": "DEFRA", + "prevYear": 2022, + "year": 2023, + "prevEnd": "2024-03-31", + "curEnd": "2025-03-31", + "daysMoved": 365, + "narrative": "Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 increased from 2024-03-31 to 2025-03-31. This is primarily due to the following factors.\n An extension to the end date of the scheme and subsequent reprofile of funding as recommended by the IPA Assurance review in March 2022.", + "label": "explained", + "why": "The narrative explicitly gives the extension to March 2025 and attributes it to the assurance review recommendation and funding reprofile.", + "source": { + "previous": { + "release": "2021-22", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022", + "csv": "https://assets.publishing.service.gov.uk/media/62d6c047e90e071e753d6936/GMPP_Government_Major_Projects_Portfolio_AR_Data_March_2022.csv", + "sha256": "f34d32e4ed93a34cb9e7500491bba4cfa9568999c7dfabcbe74e0cc4cf538f2c", + "projectColumn": null, + "projectRecord": 224, + "narrativeField": "Departmental narrative on schedule, including any deviation from planned schedule (if necessary)" + }, + "current": { + "release": "2022-23", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23", + "csv": "https://assets.publishing.service.gov.uk/media/64b79c5171749c001389ee41/GMPP_Government_Major_Projects_Portofolio_AR_Data_March_2023.csv", + "sha256": "ecd3756718a71e6f52fb25050caba535d64e7f5b21f6db361cfa10859a4364ac", + "projectColumn": null, + "projectRecord": 33, + "narrativeField": "Departmental narrative on schedule, including any deviation from planned schedule (if necessary)" + } + }, + "prevProject": "UK Seafood Fund", + "prevEndAsPublished": "2024-03-31", + "curEndAsPublished": "2025-03-31", + "matchedBy": "same GMPP ID in both releases" + }, + { + "id": "PLH5-B23", + "gmppId": "DEFRA_0012_2021-Q3", + "project": "River Thames Scheme", + "department": "DEFRA", + "prevYear": 2021, + "year": 2022, + "prevEnd": "2029-04-12", + "curEnd": "2030-04-01", + "daysMoved": 354, + "narrative": "Compared to 2021-Q4, your project end-date increased from 12 APR 2029 to 01 APR 2030 . This is primarily due to the following factors: The project has reviewed its programme of works following Outline Business Case approval. This re-baselining exercise has identified it will take longer to get to Gateway 4 - Readiness for service than previously anticipated.", + "label": "explained", + "why": "The narrative explicitly gives the extension to April 2030 and explains the rebaselining and longer route to readiness for service.", + "source": { + "previous": { + "release": "2020-21", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021", + "csv": "https://assets.publishing.service.gov.uk/media/60eecae48fa8f50c7ca55af1/GMPP_Government_Major_Projects_Portofolio_AR_Data_March_2021.csv", + "sha256": "88a38d6ab1e1865a96aebde3d18e98150e79b4167b92b82dff15dcb96fa784f1", + "projectColumn": null, + "projectRecord": 143, + "narrativeField": "Departmental narrative on schedule, including any deviation from planned schedule (if necessary)" + }, + "current": { + "release": "2021-22", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022", + "csv": "https://assets.publishing.service.gov.uk/media/62d6c047e90e071e753d6936/GMPP_Government_Major_Projects_Portfolio_AR_Data_March_2022.csv", + "sha256": "f34d32e4ed93a34cb9e7500491bba4cfa9568999c7dfabcbe74e0cc4cf538f2c", + "projectColumn": null, + "projectRecord": 189, + "narrativeField": "Departmental narrative on schedule, including any deviation from planned schedule (if necessary)" + } + }, + "prevProject": "River Thames Scheme", + "prevEndAsPublished": "12/04/2029", + "curEndAsPublished": "2030-04-01", + "matchedBy": "same GMPP ID in both releases" + }, + { + "id": "PLH5-B24", + "gmppId": "MOD_0123_2021-Q4", + "project": "Maritime Electronic Warfare System Integrated Capability", + "department": "MOD", + "prevYear": 2021, + "year": 2022, + "prevEnd": "2044-07-31", + "curEnd": "2034-06-30", + "daysMoved": -3684, + "narrative": "Compared to 2021-Q4, the project end-date decreased from 31 Jul 2044 to 30 Jun 2034. This is primarily due to the following factors: \r\nThe programme end-date has been aligned with Full Operating Capability.", + "label": "explained", + "why": "The narrative explicitly gives the shortening from July 2044 to June 2034 and explains alignment with Full Operating Capability.", + "source": { + "previous": { + "release": "2020-21", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021", + "csv": "https://assets.publishing.service.gov.uk/media/60eecae48fa8f50c7ca55af1/GMPP_Government_Major_Projects_Portofolio_AR_Data_March_2021.csv", + "sha256": "88a38d6ab1e1865a96aebde3d18e98150e79b4167b92b82dff15dcb96fa784f1", + "projectColumn": null, + "projectRecord": 102, + "narrativeField": "Departmental narrative on schedule, including any deviation from planned schedule (if necessary)" + }, + "current": { + "release": "2021-22", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022", + "csv": "https://assets.publishing.service.gov.uk/media/62d6c047e90e071e753d6936/GMPP_Government_Major_Projects_Portfolio_AR_Data_March_2022.csv", + "sha256": "f34d32e4ed93a34cb9e7500491bba4cfa9568999c7dfabcbe74e0cc4cf538f2c", + "projectColumn": null, + "projectRecord": 131, + "narrativeField": "Departmental narrative on schedule, including any deviation from planned schedule (if necessary)" + } + }, + "prevProject": "Maritime Electronic Warfare System Integrated Capability", + "prevEndAsPublished": "31/07/2044", + "curEndAsPublished": "2034-06-30", + "matchedBy": "same GMPP ID in both releases" + }, + { + "id": "PLH5-B25", + "gmppId": "BEIS_0001_1617-Q2", + "project": "Heat Networks Investment Project", + "department": "BEIS", + "prevYear": 2020, + "year": 2021, + "prevEnd": "2021-03-31", + "curEnd": "2022-03-31", + "daysMoved": 365, + "narrative": "Compared to financial year 19/20-Q2, the project's end-date increased from 31 March 2021 to 31 March 2022 . This is primarily due to the following factors: HNIP is being delivered in two phases: the pilot scheme, which is complete, and the Main Scheme which is now in the final year of delivery and scheduled to close to applicants in November 21.", + "label": "explained", + "why": "The narrative explicitly states the extension from March 2021 to March 2022, with pilot/main-scheme phases and closure to applicants distinguished.", + "source": { + "previous": { + "release": "2019-20", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2020", + "csv": "https://assets.publishing.service.gov.uk/media/5f05de523a6f40041036a2ec/GMPP_Government_Major_Projects_Portfolio_data_September_2019.csv", + "sha256": "0a9b082d6d1cd4c0887f94c6853b5e5ed5892c7c60a0d19ea9e7f839b9b7db89", + "projectColumn": 4, + "projectRecord": null, + "narrativeField": "Departmental narrative on schedule, including any deviation from planned schedule (if necessary)" + }, + "current": { + "release": "2020-21", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021", + "csv": "https://assets.publishing.service.gov.uk/media/60eecae48fa8f50c7ca55af1/GMPP_Government_Major_Projects_Portofolio_AR_Data_March_2021.csv", + "sha256": "88a38d6ab1e1865a96aebde3d18e98150e79b4167b92b82dff15dcb96fa784f1", + "projectColumn": null, + "projectRecord": 6, + "narrativeField": "Departmental narrative on schedule, including any deviation from planned schedule (if necessary)" + } + }, + "prevProject": "Heat Networks Investment Project", + "prevEndAsPublished": "31/03/2021", + "curEndAsPublished": "31/03/2022", + "matchedBy": "same GMPP ID in both releases" + }, + { + "id": "PLH5-B26", + "gmppId": "DCMS_0010_1718-Q3", + "project": "Local Full Fibre Networks", + "department": "DCMS", + "prevYear": 2020, + "year": 2021, + "prevEnd": "2021-12-01", + "curEnd": "2021-12-31", + "daysMoved": 30, + "narrative": "Compared to financial year 19/20-Q2, the project's end-date increased from 01 December 2021 to 31 December 2021 . This is primarily due to the following factors: HMT approval has been given to extend the programme to December 2021. All projects are planned to be completed within this schedule.", + "label": "explained", + "why": "The narrative explicitly gives the move from 1 December to 31 December 2021 and states that HM Treasury approved the extension.", + "source": { + "previous": { + "release": "2019-20", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2020", + "csv": "https://assets.publishing.service.gov.uk/media/5f05de523a6f40041036a2ec/GMPP_Government_Major_Projects_Portfolio_data_September_2019.csv", + "sha256": "0a9b082d6d1cd4c0887f94c6853b5e5ed5892c7c60a0d19ea9e7f839b9b7db89", + "projectColumn": 22, + "projectRecord": null, + "narrativeField": "Departmental narrative on schedule, including any deviation from planned schedule (if necessary)" + }, + "current": { + "release": "2020-21", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021", + "csv": "https://assets.publishing.service.gov.uk/media/60eecae48fa8f50c7ca55af1/GMPP_Government_Major_Projects_Portofolio_AR_Data_March_2021.csv", + "sha256": "88a38d6ab1e1865a96aebde3d18e98150e79b4167b92b82dff15dcb96fa784f1", + "projectColumn": null, + "projectRecord": 161, + "narrativeField": "Departmental narrative on schedule, including any deviation from planned schedule (if necessary)" + } + }, + "prevProject": "Local Full Fibre Networks", + "prevEndAsPublished": "01/12/2021", + "curEndAsPublished": "31/12/2021", + "matchedBy": "same GMPP ID in both releases" + }, + { + "id": "PLH5-B27", + "gmppId": "DFT_0021_1314-Q3", + "project": "Rail Franchising Programme", + "department": "DFT", + "prevYear": 2019, + "year": 2020, + "prevEnd": "2019-03-31", + "curEnd": "2019-09-14", + "daysMoved": 167, + "narrative": "The scheduled baseline project end date at Q2 1920 (30th September 2019) is 14/09/19, has lengthened by 167 days since last year's Q2 1819 date of 31/03/19, due primarily to the following factors;\n\n - Given the nature of the Rail Franchising Programme, Passenger Services and IPA agreed to use the most advanced project to report on delivery Milestones. In Q2 1819 Q2 this was South Eastern Project with end date of 31/03/2019. The reason for the 167 day increase is that in Q2 1920 the most advanced project was West Coast Partnership with an end date of 14/09/2019. \n", + "label": "explained", + "why": "The narrative explicitly gives the 167-day increase and explains that the reporting convention changed from the South Eastern project to West Coast Partnership.", + "source": { + "previous": { + "release": "2018-19", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2019", + "csv": "https://assets.publishing.service.gov.uk/media/5d2dd08d40f0b64a8626b762/Annual_Report_on_Major_Projects_2018_to_2019__consolidated_data_and_narratives.csv", + "sha256": "c22caa602ec3a7d9cc64cb20d559dbd5dbd0b9ceae5b4184675f247138d5b8b8", + "projectColumn": 45, + "projectRecord": null, + "narrativeField": "Departmental narrative on schedule, including any deviation from planned schedule (if necessary)" + }, + "current": { + "release": "2019-20", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2020", + "csv": "https://assets.publishing.service.gov.uk/media/5f05de523a6f40041036a2ec/GMPP_Government_Major_Projects_Portfolio_data_September_2019.csv", + "sha256": "0a9b082d6d1cd4c0887f94c6853b5e5ed5892c7c60a0d19ea9e7f839b9b7db89", + "projectColumn": 45, + "projectRecord": null, + "narrativeField": "Departmental narrative on schedule, including any deviation from planned schedule (if necessary)" + } + }, + "prevProject": "Rail Franchising Programme", + "prevEndAsPublished": "31/03/2019", + "curEndAsPublished": "14/09/2019", + "matchedBy": "unique project name normalised for case, spacing and punctuation, with the same department" + }, + { + "id": "PLH5-B28", + "gmppId": "MOJ_0003_1112-Q1", + "project": "Electronic Monitoring", + "department": "MOJ", + "prevYear": 2020, + "year": 2021, + "prevEnd": "2024-08-31", + "curEnd": "2022-04-01", + "daysMoved": -883, + "narrative": "Compared to financial year 19/20-Q2, the project's end-date decreased from 31 August 2024 to 01 April 2022 . This is primarily due to the following factors: The Project's end date has previously reflected the current end dates for the Electronic Monitoring contracts which remain static; but the end date now reflects the closure of the project and transfer of the service to regular operation and the Electronic Monitoring Expansion Programme.", + "label": "explained", + "why": "The narrative explicitly gives the shortening from August 2024 to April 2022 and explains the switch from contract end dates to project closure and transfer to regular operation.", + "source": { + "previous": { + "release": "2019-20", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2020", + "csv": "https://assets.publishing.service.gov.uk/media/5f05de523a6f40041036a2ec/GMPP_Government_Major_Projects_Portfolio_data_September_2019.csv", + "sha256": "0a9b082d6d1cd4c0887f94c6853b5e5ed5892c7c60a0d19ea9e7f839b9b7db89", + "projectColumn": 114, + "projectRecord": null, + "narrativeField": "Departmental narrative on schedule, including any deviation from planned schedule (if necessary)" + }, + "current": { + "release": "2020-21", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021", + "csv": "https://assets.publishing.service.gov.uk/media/60eecae48fa8f50c7ca55af1/GMPP_Government_Major_Projects_Portofolio_AR_Data_March_2021.csv", + "sha256": "88a38d6ab1e1865a96aebde3d18e98150e79b4167b92b82dff15dcb96fa784f1", + "projectColumn": null, + "projectRecord": 125, + "narrativeField": "Departmental narrative on schedule, including any deviation from planned schedule (if necessary)" + } + }, + "prevProject": "Electronic Monitoring", + "prevEndAsPublished": "31/08/2024", + "curEndAsPublished": "01/04/2022", + "matchedBy": "same GMPP ID in both releases" + }, + { + "id": "PLH5-B29", + "gmppId": "CO_0210_2223-Q4", + "project": "ROSA RENEWAL PROJECT", + "department": "CO", + "prevYear": 2024, + "year": 2025, + "prevEnd": "2025-03-31", + "curEnd": "2025-03-31", + "daysMoved": 0, + "narrative": "Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2025. This is primarily due to the following factors‚\nRRP successfully closed in line with the agreed baseline of March 2025", + "label": "no-move", + "why": "The end stays at 31 March 2025 and the narrative says the project closed in line with that March 2025 baseline.", + "source": { + "previous": { + "release": "2023-24", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24", + "csv": "https://assets.publishing.service.gov.uk/media/6787e8ee1124a2c3ceb646be/Government_Major_Projects_Portofolio_AR_Data_March_2024.csv", + "sha256": "29596242964ff850351b9d091ae7db2584e1c8cdec3b7c8e53ca661479db614b", + "projectColumn": null, + "projectRecord": 126, + "narrativeField": "Departmental narrative on schedule, including any deviation from planned schedule (if necessary)" + }, + "current": { + "release": "2024-25", + "publication": "https://www.gov.uk/government/publications/nista-annual-report-2024-2025", + "csv": "https://assets.publishing.service.gov.uk/media/6895fbb63080e72710b2e2ef/nista_annual_report_data_2425.csv", + "sha256": "cac14ed4e6a90a81486bdc24295ea40996e7fd6fcd3834e3ffad8a2685f8c8b3", + "projectColumn": null, + "projectRecord": 10, + "narrativeField": "Schedule Narrative" + } + }, + "prevProject": "Rosa Renewal Project", + "prevEndAsPublished": "2025-03-31", + "curEndAsPublished": "31/03/2025", + "matchedBy": "same GMPP ID in both releases" + }, + { + "id": "PLH5-B30", + "gmppId": "DEFRA_0016_2122-Q1", + "project": "BIOSECURITY, BORDERS AND TRADE PROGRAMME", + "department": "DEFRA", + "prevYear": 2024, + "year": 2025, + "prevEnd": "2025-03-31", + "curEnd": "2025-03-31", + "daysMoved": 0, + "narrative": "Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2025. This is primarily due to the following factors‚\nThe programme closed on 31 March 2025 as scheduled.", + "label": "no-move", + "why": "The end stays at 31 March 2025. The narrative explicitly says the programme closed on that date as scheduled.", + "source": { + "previous": { + "release": "2023-24", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24", + "csv": "https://assets.publishing.service.gov.uk/media/6787e8ee1124a2c3ceb646be/Government_Major_Projects_Portofolio_AR_Data_March_2024.csv", + "sha256": "29596242964ff850351b9d091ae7db2584e1c8cdec3b7c8e53ca661479db614b", + "projectColumn": null, + "projectRecord": 132, + "narrativeField": "Departmental narrative on schedule, including any deviation from planned schedule (if necessary)" + }, + "current": { + "release": "2024-25", + "publication": "https://www.gov.uk/government/publications/nista-annual-report-2024-2025", + "csv": "https://assets.publishing.service.gov.uk/media/6895fbb63080e72710b2e2ef/nista_annual_report_data_2425.csv", + "sha256": "cac14ed4e6a90a81486bdc24295ea40996e7fd6fcd3834e3ffad8a2685f8c8b3", + "projectColumn": null, + "projectRecord": 22, + "narrativeField": "Schedule Narrative" + } + }, + "prevProject": "Defra Biosecurity, Borders and Trade Programme (BBTP)", + "prevEndAsPublished": "2025-03-31", + "curEndAsPublished": "31/03/2025", + "matchedBy": "same GMPP ID in both releases" + }, + { + "id": "PLH5-B31", + "gmppId": "BEIS_0001_2122-Q2", + "project": "LOW COST NUCLEAR PROGRAMME (ROLLS ROYCE SMRS CHALLENGE)", + "department": "DESNZ", + "prevYear": 2024, + "year": 2025, + "prevEnd": "2025-03-31", + "curEnd": "2025-03-31", + "daysMoved": 0, + "narrative": "Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2025. This is primarily due to the following factors‚\nKey drivers for the timeline of the project were the need to reach design maturity points and progress through Generic Design Assessment (GDA). Step 2 of GDA was completed by 31/07/2024 with the remainder of the objectives and benefits progressed by 30/03/2025. It should be noted that development of the RR SMR design including further GDA progress continues after the end of grant funding.", + "label": "no-move", + "why": "The end stays at 31 March 2025 and the narrative states that same date. Continuing reactor-design work is explicitly distinguished from the end of grant funding.", + "source": { + "previous": { + "release": "2023-24", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24", + "csv": "https://assets.publishing.service.gov.uk/media/6787e8ee1124a2c3ceb646be/Government_Major_Projects_Portofolio_AR_Data_March_2024.csv", + "sha256": "29596242964ff850351b9d091ae7db2584e1c8cdec3b7c8e53ca661479db614b", + "projectColumn": null, + "projectRecord": 15, + "narrativeField": "Departmental narrative on schedule, including any deviation from planned schedule (if necessary)" + }, + "current": { + "release": "2024-25", + "publication": "https://www.gov.uk/government/publications/nista-annual-report-2024-2025", + "csv": "https://assets.publishing.service.gov.uk/media/6895fbb63080e72710b2e2ef/nista_annual_report_data_2425.csv", + "sha256": "cac14ed4e6a90a81486bdc24295ea40996e7fd6fcd3834e3ffad8a2685f8c8b3", + "projectColumn": null, + "projectRecord": 39, + "narrativeField": "Schedule Narrative" + } + }, + "prevProject": "Low Cost Nuclear Programme (Rolls Royce SMRs Challenge)", + "prevEndAsPublished": "2025-03-31 00:00:00", + "curEndAsPublished": "31/03/2025", + "matchedBy": "same GMPP ID in both releases" + }, + { + "id": "PLH5-B32", + "gmppId": "DHSC_0253_2324-Q1", + "project": "DATA FOR RESEARCH AND DEVELOPMENT (R&D)", + "department": "DHSC", + "prevYear": 2024, + "year": 2025, + "prevEnd": "2025-03-31", + "curEnd": "2025-03-31", + "daysMoved": 0, + "narrative": "Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2025. This is primarily due to the following factors‚\n‚ the programme has delivered in line with the timescales in the business case and is due to close before the start of the current GMPP reporting cycle.", + "label": "no-move", + "why": "The end stays at 31 March 2025. The narrative repeats that date and reports delivery in line with the business-case timescales, without naming a competing current end.", + "source": { + "previous": { + "release": "2023-24", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24", + "csv": "https://assets.publishing.service.gov.uk/media/6787e8ee1124a2c3ceb646be/Government_Major_Projects_Portofolio_AR_Data_March_2024.csv", + "sha256": "29596242964ff850351b9d091ae7db2584e1c8cdec3b7c8e53ca661479db614b", + "projectColumn": null, + "projectRecord": 161, + "narrativeField": "Departmental narrative on schedule, including any deviation from planned schedule (if necessary)" + }, + "current": { + "release": "2024-25", + "publication": "https://www.gov.uk/government/publications/nista-annual-report-2024-2025", + "csv": "https://assets.publishing.service.gov.uk/media/6895fbb63080e72710b2e2ef/nista_annual_report_data_2425.csv", + "sha256": "cac14ed4e6a90a81486bdc24295ea40996e7fd6fcd3834e3ffad8a2685f8c8b3", + "projectColumn": null, + "projectRecord": 50, + "narrativeField": "Schedule Narrative" + } + }, + "prevProject": "Data for Research and Development (R&D)", + "prevEndAsPublished": "2025-03-31", + "curEndAsPublished": "31/03/2025", + "matchedBy": "same GMPP ID in both releases" + }, + { + "id": "PLH5-B33", + "gmppId": "DHSC_0096_2122-Q4", + "project": "DIGITISING SOCIAL CARE", + "department": "DHSC", + "prevYear": 2024, + "year": 2025, + "prevEnd": "2025-03-31", + "curEnd": "2025-03-31", + "daysMoved": 0, + "narrative": "Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2025. This is primarily due to the following factors‚\nThe programme is forecasting to achieve 80% adoption in the coming months, therefore the programme is exiting the GMPP and standing up to two successor programmes to continue building on progress and sustainability. ", + "label": "no-move", + "why": "The end stays at 31 March 2025 and the narrative states that same date. Two successor programmes are distinguished from the programme exiting GMPP.", + "source": { + "previous": { + "release": "2023-24", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24", + "csv": "https://assets.publishing.service.gov.uk/media/6787e8ee1124a2c3ceb646be/Government_Major_Projects_Portofolio_AR_Data_March_2024.csv", + "sha256": "29596242964ff850351b9d091ae7db2584e1c8cdec3b7c8e53ca661479db614b", + "projectColumn": null, + "projectRecord": 163, + "narrativeField": "Departmental narrative on schedule, including any deviation from planned schedule (if necessary)" + }, + "current": { + "release": "2024-25", + "publication": "https://www.gov.uk/government/publications/nista-annual-report-2024-2025", + "csv": "https://assets.publishing.service.gov.uk/media/6895fbb63080e72710b2e2ef/nista_annual_report_data_2425.csv", + "sha256": "cac14ed4e6a90a81486bdc24295ea40996e7fd6fcd3834e3ffad8a2685f8c8b3", + "projectColumn": null, + "projectRecord": 54, + "narrativeField": "Schedule Narrative" + } + }, + "prevProject": "Digitising Social Care", + "prevEndAsPublished": "2025-03-31", + "curEndAsPublished": "31/03/2025", + "matchedBy": "same GMPP ID in both releases" + }, + { + "id": "PLH5-B34", + "gmppId": "DFE_0173_2223-Q2", + "project": "Higher Technical Education", + "department": "DFE", + "prevYear": 2023, + "year": 2024, + "prevEnd": "2027-09-01", + "curEnd": "2027-09-01", + "daysMoved": 0, + "narrative": "Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2027-09-01. This is primarily due to the following factors. \n\n The programme schedule remains achievable.", + "label": "no-move", + "why": "The end stays at 1 September 2027 and the narrative repeats that date, saying the schedule remains achievable.", + "source": { + "previous": { + "release": "2022-23", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23", + "csv": "https://assets.publishing.service.gov.uk/media/64b79c5171749c001389ee41/GMPP_Government_Major_Projects_Portofolio_AR_Data_March_2023.csv", + "sha256": "ecd3756718a71e6f52fb25050caba535d64e7f5b21f6db361cfa10859a4364ac", + "projectColumn": null, + "projectRecord": 56, + "narrativeField": "Departmental narrative on schedule, including any deviation from planned schedule (if necessary)" + }, + "current": { + "release": "2023-24", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24", + "csv": "https://assets.publishing.service.gov.uk/media/6787e8ee1124a2c3ceb646be/Government_Major_Projects_Portofolio_AR_Data_March_2024.csv", + "sha256": "29596242964ff850351b9d091ae7db2584e1c8cdec3b7c8e53ca661479db614b", + "projectColumn": null, + "projectRecord": 28, + "narrativeField": "Departmental narrative on schedule, including any deviation from planned schedule (if necessary)" + } + }, + "prevProject": "Higher Technical Education", + "prevEndAsPublished": "2027-09-01", + "curEndAsPublished": "2027-09-01", + "matchedBy": "same GMPP ID in both releases" + }, + { + "id": "PLH5-B35", + "gmppId": "MOJ_0073_2122-Q4", + "project": "Drug Testing Services", + "department": "MOJ", + "prevYear": 2024, + "year": 2025, + "prevEnd": "2025-10-08", + "curEnd": "2025-10-08", + "daysMoved": 0, + "narrative": "Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 08/10/2025. This is primarily due to the following factors‚\nThe project is on track to deliver against the baseline schedule.", + "label": "no-move", + "why": "The end stays at 8 October 2025 and the narrative repeats that date with an on-track claim.", + "source": { + "previous": { + "release": "2023-24", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24", + "csv": "https://assets.publishing.service.gov.uk/media/6787e8ee1124a2c3ceb646be/Government_Major_Projects_Portofolio_AR_Data_March_2024.csv", + "sha256": "29596242964ff850351b9d091ae7db2584e1c8cdec3b7c8e53ca661479db614b", + "projectColumn": null, + "projectRecord": 52, + "narrativeField": "Departmental narrative on schedule, including any deviation from planned schedule (if necessary)" + }, + "current": { + "release": "2024-25", + "publication": "https://www.gov.uk/government/publications/nista-annual-report-2024-2025", + "csv": "https://assets.publishing.service.gov.uk/media/6895fbb63080e72710b2e2ef/nista_annual_report_data_2425.csv", + "sha256": "cac14ed4e6a90a81486bdc24295ea40996e7fd6fcd3834e3ffad8a2685f8c8b3", + "projectColumn": null, + "projectRecord": 199, + "narrativeField": "Schedule Narrative" + } + }, + "prevProject": "Drug Testing Services", + "prevEndAsPublished": "2025-10-08", + "curEndAsPublished": "08/10/2025", + "matchedBy": "same GMPP ID in both releases" + }, + { + "id": "PLH5-B36", + "gmppId": "MOD_0142_2122-Q1", + "project": "MARTLET", + "department": "MOD", + "prevYear": 2024, + "year": 2025, + "prevEnd": "2025-12-19", + "curEnd": "2025-12-19", + "daysMoved": 0, + "narrative": "Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 19/12/2025. This is primarily due to the following factors.\nFull Operating Capability is on target to be achieved in summer 2025. The programme end date has been maintained compared to 12 months ago.", + "label": "no-move", + "why": "The end stays at 19 December 2025. The narrative explicitly says the programme end has been maintained; summer 2025 is a separate Full Operating Capability milestone.", + "source": { + "previous": { + "release": "2023-24", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24", + "csv": "https://assets.publishing.service.gov.uk/media/6787e8ee1124a2c3ceb646be/Government_Major_Projects_Portofolio_AR_Data_March_2024.csv", + "sha256": "29596242964ff850351b9d091ae7db2584e1c8cdec3b7c8e53ca661479db614b", + "projectColumn": null, + "projectRecord": 114, + "narrativeField": "Departmental narrative on schedule, including any deviation from planned schedule (if necessary)" + }, + "current": { + "release": "2024-25", + "publication": "https://www.gov.uk/government/publications/nista-annual-report-2024-2025", + "csv": "https://assets.publishing.service.gov.uk/media/6895fbb63080e72710b2e2ef/nista_annual_report_data_2425.csv", + "sha256": "cac14ed4e6a90a81486bdc24295ea40996e7fd6fcd3834e3ffad8a2685f8c8b3", + "projectColumn": null, + "projectRecord": 185, + "narrativeField": "Schedule Narrative" + } + }, + "prevProject": "Martlet", + "prevEndAsPublished": "2025-12-19 00:00:00", + "curEndAsPublished": "19/12/2025", + "matchedBy": "same GMPP ID in both releases" + }, + { + "id": "PLH5-B37", + "gmppId": null, + "project": "NHS Pension Re-let", + "department": "DHSC", + "prevYear": 2018, + "year": 2019, + "prevEnd": "2017-07-21", + "curEnd": "2017-07-21", + "daysMoved": 0, + "narrative": "In August 2016 an Outline Business Case Addendum was approved to deliver a refined hybrid model so that the NHS Business Services Authority undertake Payroll Administration services in addition to Pensioner Administration, insourcing from the incumbent supplier with transitional support provided in line with contractual exit provisions. As such the project closure date of 21 July 2017 moved to 21 July 2018 (date that the existing contract expired plus one year's transitional support). Pensioner Administration and Payroll responsibilities transferred to the NHS Business Services Authority on 2 July 2018, completing the insourcing activities, and successfully delivering against the original programme objectives. The programme has remained on GMPP after closure pending independent assurance that the benefits have successfully been delivered", + "label": "published-date-check", + "why": "The published end stays at 21 July 2017, while the narrative explicitly says the project closure moved to 21 July 2018. The date field and closure commentary disagree.", + "source": { + "previous": { + "release": "2017-18", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2018", + "csv": "https://assets.publishing.service.gov.uk/media/5b3e2e2340f0b678bc5d018c/csv-ipa-government-major-projects-portfolio-data-september-2017.csv", + "sha256": "915cf52ff57a180c9f3989e9e29e56594efd81da1e66fa3757d66a145b71f726", + "projectColumn": 52, + "projectRecord": null, + "narrativeField": "Departmental narrative on schedule, including any deviation from planned schedule (if necessary)" + }, + "current": { + "release": "2018-19", + "publication": "https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2019", + "csv": "https://assets.publishing.service.gov.uk/media/5d2dd08d40f0b64a8626b762/Annual_Report_on_Major_Projects_2018_to_2019__consolidated_data_and_narratives.csv", + "sha256": "c22caa602ec3a7d9cc64cb20d559dbd5dbd0b9ceae5b4184675f247138d5b8b8", + "projectColumn": 54, + "projectRecord": null, + "narrativeField": "Departmental narrative on schedule, including any deviation from planned schedule (if necessary)" + } + }, + "prevProject": "NHS Pension Re-let", + "prevEndAsPublished": "21/07/17", + "curEndAsPublished": "21/07/2017", + "matchedBy": "unique project name normalised for case, spacing and punctuation, with the same department" + }, + { + "id": "PLH5-B38", + "gmppId": null, + "project": "NOMS ICTS Services (NIS) Programme (formally part of Quantum Re-compete Project)", + "department": "MOJ", + "prevYear": 2014, + "year": 2015, + "prevEnd": "2014-11-30", + "curEnd": "2014-11-30", + "daysMoved": 0, + "narrative": "Deployment of the main rollout activities was paused between August and December 2014, whilst significant performance issues were investigated and corrected. \n\nThe revised remediation plan agreed by the Programme Board, sets out the new phased approach to delivery. This has had significant impact on the schedule, moving the main rollout and programme closure into 2015/16. \n\nHowever, some aspects of the programme (printer deployment and Satellite replacement) have now been completed.", + "label": "published-date-check", + "why": "The published end stays at 30 November 2014, while the narrative explicitly moves programme closure into 2015/16. This is a later current closure period, not merely a dated intermediate rollout milestone.", + "source": { + "previous": { + "release": "2013-14", + "publication": "https://www.gov.uk/government/publications/major-projects-authority-annual-report-2014", + "csv": "https://assets.publishing.service.gov.uk/media/5a7ea47a40f0b62305b823ee/Government_Major_Projects_Portfolio_data__September_2013__CSV_.csv", + "sha256": "67cb811e8bf3f807ecee8cf177e36036bb6c0810a7c6f4077364cfebabb302a1", + "projectColumn": 188, + "projectRecord": null, + "narrativeField": "Departmental narrative on schedule, including any deviation from planned schedule (if necessary)" + }, + "current": { + "release": "2014-15", + "publication": "https://www.gov.uk/government/publications/major-projects-authority-annual-report-2015", + "csv": "https://assets.publishing.service.gov.uk/media/5a801db6ed915d74e33f88a0/GMPP_data_september_2014.csv", + "sha256": "addde3f42fb6e4408c30e62d8cf3bf32eb5267d10802e13b3718faf051aef117", + "projectColumn": 176, + "projectRecord": null, + "narrativeField": "Departmental narrative on schedule, including any deviation from planned schedule (if necessary)" + } + }, + "prevProject": "NOMS ICTS Services (NIS) Programme (formally part of Quantum Re-compete Project)", + "prevEndAsPublished": "30/11/2014", + "curEndAsPublished": "30/11/2014", + "matchedBy": "unique project name normalised for case, spacing and punctuation, with the same department" + }, + { + "id": "PLH5-B39", + "gmppId": null, + "project": "Prison Competitions Phase 2", + "department": "MOJ", + "prevYear": 2014, + "year": 2015, + "prevEnd": "2014-01-31", + "curEnd": "2014-01-31", + "daysMoved": 0, + "narrative": "The Programme completed all its deliverables in December 2013. Following the standard MPA approach to assess costs and benefits, sufficient time operating under a new contract must be allowed before formal project closure can be achieved. An independent assurance review to assess delivery of benefits was undertaken in Autumn 2014, enabling formal closure in early 2015.", + "label": "published-date-check", + "why": "The published end stays at 31 January 2014. The narrative distinguishes December 2013 deliverables from formal closure in early 2015, so the unchanged end field warrants checking.", + "source": { + "previous": { + "release": "2013-14", + "publication": "https://www.gov.uk/government/publications/major-projects-authority-annual-report-2014", + "csv": "https://assets.publishing.service.gov.uk/media/5a7ea47a40f0b62305b823ee/Government_Major_Projects_Portfolio_data__September_2013__CSV_.csv", + "sha256": "67cb811e8bf3f807ecee8cf177e36036bb6c0810a7c6f4077364cfebabb302a1", + "projectColumn": 189, + "projectRecord": null, + "narrativeField": "Departmental narrative on schedule, including any deviation from planned schedule (if necessary)" + }, + "current": { + "release": "2014-15", + "publication": "https://www.gov.uk/government/publications/major-projects-authority-annual-report-2015", + "csv": "https://assets.publishing.service.gov.uk/media/5a801db6ed915d74e33f88a0/GMPP_data_september_2014.csv", + "sha256": "addde3f42fb6e4408c30e62d8cf3bf32eb5267d10802e13b3718faf051aef117", + "projectColumn": 177, + "projectRecord": null, + "narrativeField": "Departmental narrative on schedule, including any deviation from planned schedule (if necessary)" + } + }, + "prevProject": "Prison Competitions Phase 2", + "prevEndAsPublished": "31/01/2014", + "curEndAsPublished": "31/01/2014", + "matchedBy": "unique project name normalised for case, spacing and punctuation, with the same department" + }, + { + "id": "PLH5-B40", + "gmppId": null, + "project": "Mersey Care NHS LIFT scheme (TIME - To Improve Mental Health Environments)", + "department": "DOH", + "prevYear": 2013, + "year": 2014, + "prevEnd": "2015-01-20", + "curEnd": "2015-01-20", + "daysMoved": 0, + "narrative": "Allowing for a post-completion review in June 2011, the end date for the first part of the Project (the completion of the \"Clock View\" building at Walton) is now December 2015. The delay was chiefly attributable to delays in achieving approval and the securing of institutional funding. ", + "label": "published-date-check", + "why": "The published end stays at 20 January 2015, while the narrative says the first part of the project now ends in December 2015. Even that first-part completion is after the published whole-project end.", + "source": { + "previous": { + "release": "2012-13", + "publication": "https://www.gov.uk/government/publications/government-major-projects-portfolio-data-for-department-of-health-2013--2", + "csv": "https://assets.publishing.service.gov.uk/media/5a7cab85ed915d6969f46841/gmpp-data-DH-q2-2012-13.csv", + "sha256": "f631a2722cf4dbd3a8df742701cd21d8295297441e2f5af3ddfb458e9a359d33", + "projectColumn": 5, + "projectRecord": null, + "narrativeField": "Departmental narrative on schedule, including any deviation from planned schedule (if necessary)" + }, + "current": { + "release": "2013-14", + "publication": "https://www.gov.uk/government/publications/major-projects-authority-annual-report-2014", + "csv": "https://assets.publishing.service.gov.uk/media/5a7ea47a40f0b62305b823ee/Government_Major_Projects_Portfolio_data__September_2013__CSV_.csv", + "sha256": "67cb811e8bf3f807ecee8cf177e36036bb6c0810a7c6f4077364cfebabb302a1", + "projectColumn": 61, + "projectRecord": null, + "narrativeField": "Departmental narrative on schedule, including any deviation from planned schedule (if necessary)" + } + }, + "prevProject": "Mersey Care NHS LIFT scheme (TIME - To Improve Mental health Environments)", + "prevEndAsPublished": "20/01/2015", + "curEndAsPublished": "20/01/2015", + "matchedBy": "unique project name normalised for case, spacing and punctuation, with the same department", + "labelCaveat": "The commentary explicitly dates the first part of a phased project, rather than an unqualified whole-project closure. It still places that completion after the published project end, so this is a date check rather than an assertion that the whole project closes in December 2015." + } + ] +} diff --git a/bench/real-cases/run.mjs b/bench/real-cases/run.mjs new file mode 100644 index 0000000..7b3ebab --- /dev/null +++ b/bench/real-cases/run.mjs @@ -0,0 +1,43 @@ +// Real-case accuracy benchmark for the narrative check. Every pair is real published +// UK Government Major Projects Portfolio data (Open Government Licence); sources in SOURCES.md. +// Labels: contradiction | explained | no-move | published-date-check. +// Exits 1 if any set scores below its floor in floors.json (the score when this was added). +// Usage: node bench/real-cases/run.mjs [--update-floors] +import fs from 'node:fs'; +import path from 'node:path'; +import { createRequire } from 'node:module'; +import { fileURLToPath } from 'node:url'; +const require = createRequire(import.meta.url); +const dir = path.dirname(fileURLToPath(import.meta.url)); +const E = require('../../docs/engine/projectlens-engine.js'); +const floors = JSON.parse(fs.readFileSync(path.join(dir, 'floors.json'), 'utf8')); +const sets = fs.readdirSync(dir).filter((f) => /^projectlens-heldout\d*\.json$/.test(f)).sort(); +const scores = {}; +let failed = false; +for (const file of sets) { + const raw = JSON.parse(fs.readFileSync(path.join(dir, file), 'utf8')); + const pairs = Array.isArray(raw) ? raw : (raw.pairs || raw.cases); + const byLabel = {}; + const misses = []; + let right = 0; + for (const p of pairs) { + const r = E.detectScheduleClaims(p.narrative || '', { previousFinish: p.prevEnd, currentFinish: p.curEnd }); + const got = r.contradiction ? 'contradiction' : (r.publishedDateCheck ? 'published-date-check' : 'none'); + const want = p.label === 'contradiction' || p.label === 'published-date-check' ? p.label : 'none'; + const ok = got === want; + byLabel[p.label] ||= [0, 0]; + byLabel[p.label][1] += 1; + if (ok) { right += 1; byLabel[p.label][0] += 1; } else misses.push(` ${p.id} ${p.label}, got ${got} (moved ${p.daysMoved} days): ${p.project.slice(0, 60)}`); + } + scores[file] = right; + const floor = floors[file] ?? 0; + if (right < floor) failed = true; + const parts = Object.entries(byLabel).map(([k, [a, b]]) => `${k} ${a}/${b}`).join(', '); + console.log(`${file}: ${right}/${pairs.length} (floor ${floor}) ${right < floor ? 'BELOW FLOOR' : 'ok'} | ${parts}`); + if (misses.length) console.log(misses.join('\n')); +} +if (process.argv.includes('--update-floors')) { + fs.writeFileSync(path.join(dir, 'floors.json'), `${JSON.stringify(scores, null, 2)}\n`); + console.log('floors.json updated'); +} +process.exit(failed ? 1 : 0); diff --git a/bin/projectlens.mjs b/bin/projectlens.mjs new file mode 100755 index 0000000..c0e7ea3 --- /dev/null +++ b/bin/projectlens.mjs @@ -0,0 +1,253 @@ +#!/usr/bin/env node +/** + * ProjectLens local CLI — compare two schedules, or batch a folder by project. + * No network calls. Exit 0 = no contradiction, 1 = contradiction found, 3 = input error. + */ +import fs from "node:fs"; +import path from "node:path"; +import { createRequire } from "node:module"; +import { fileURLToPath } from "node:url"; + +const __dirname = path.dirname(fileURLToPath(import.meta.url)); +const REPO = path.resolve(__dirname, ".."); +const require = createRequire(import.meta.url); +const engine = require(path.join(REPO, "docs/engine/projectlens-engine.js")); +require(path.join(REPO, "docs/engine/xml-schedules.js")); + +function fail(message, code = 3) { + process.stderr.write(`${message}\n`); + process.exit(code); +} + +function parseArgs(argv) { + const args = { _: [] }; + for (let i = 0; i < argv.length; i += 1) { + const token = argv[i]; + if (token.startsWith("--")) { + const key = token.slice(2); + const next = argv[i + 1]; + if (!next || next.startsWith("--")) args[key] = true; + else { + args[key] = next; + i += 1; + } + } else args._.push(token); + } + return args; +} + +function readSchedule(filePath, projectId) { + if (!filePath) fail("Missing schedule file path."); + if (/\.mpp$/i.test(filePath)) { + fail("Export this schedule from MS Project as XML (File > Save As > XML) and load that"); + } + if (/\.pdf$/i.test(filePath)) fail("Paste the narrative text"); + if (!fs.existsSync(filePath)) fail(`File not found: ${filePath}`); + const bytes = fs.readFileSync(filePath); + const name = path.basename(filePath); + if (/\.xml$/i.test(filePath)) { + const text = bytes.toString("utf8"); + if (/ b.type === "Contradiction"), + narrativeClaim: claims.stable[0]?.phrase || claims.movesStated[0] && "move stated" || "", + claim: engine.findingSentence(claims, { + currentFinish: current.project.scheduledFinish, + previousFinish: previous.project.scheduledFinish, + }), + publishedDateCheck: claims.publishedDateCheck, + claims, + blockers: review.blockers, + }; +} + +function formatResult(result, format) { + if (format === "json") return `${JSON.stringify(result, null, 2)}\n`; + if (format === "csv") { + const header = "project,previous_date,current_date,finish_previous,finish_current,days_moved,narrative_claim,contradiction"; + const row = [ + result.project, + result.dataDatePrevious, + result.dataDateCurrent, + result.finishPrevious, + result.finishCurrent, + result.finishMovement, + JSON.stringify(result.narrativeClaim || ""), + result.contradiction, + ].join(","); + return `${header}\n${row}\n`; + } + const evidence = result.claims.evidence; + const quotation = evidence ? `Update: ${evidence.sentence.replace(evidence.phrase, phrase => `**${phrase}**`)}` : null; + if (format === "md") { + const lines = [ + `# ${result.project}`, + "", + `- Finish movement: ${result.finishMovement} days (${result.finishPrevious} → ${result.finishCurrent})`, + `- Contradiction: ${result.contradiction ? "yes" : "no"}`, + `- Narrative claim: ${result.narrativeClaim || "none"}`, + ]; + if (result.claim) lines.push(`- ${result.claim}`); + if (quotation) lines.push("", quotation); + lines.push(""); + return lines.join("\n"); + } + // text + const lines = [ + `Project: ${result.project}`, + `Finish: ${result.finishPrevious} → ${result.finishCurrent} (${result.finishMovement} days)`, + `Contradiction: ${result.contradiction ? "yes" : "no"}`, + ]; + if (result.narrativeClaim) lines.push(`Narrative claim: ${result.narrativeClaim}`); + if (result.claim) lines.push(result.claim); + if (quotation) lines.push(quotation); + for (const blocker of (result.blockers || []).filter(item => item.title !== result.claim)) lines.push(`- ${blocker.type}: ${blocker.title}`); + return `${lines.join("\n")}\n`; +} + +function cmdCompare(args) { + const format = args.format || "text"; + const previous = readSchedule(args.previous, args.project); + const current = readSchedule(args.current, args.project); + const narrative = readNarrative(args.narrative); + let result; + try { + result = comparePair(previous, current, narrative); + } catch (error) { + fail(error.message || String(error)); + } + process.stdout.write(formatResult(result, format)); + process.exit(result.contradiction ? 1 : 0); +} + +function listScheduleFiles(dir) { + return fs.readdirSync(dir) + .filter(name => /\.(xer|xml)$/i.test(name)) + .map(name => path.join(dir, name)) + .sort(); +} + +function cmdBatch(args) { + const dir = args.dir; + if (!dir || !fs.existsSync(dir)) fail("batch requires --dir "); + const format = args.format || "csv"; + if (!["csv", "json"].includes(format)) fail("batch --format must be csv or json"); + const files = listScheduleFiles(dir); + if (files.length < 2) fail("batch needs at least two schedule files in the folder"); + + const parsed = files.map(filePath => { + const schedule = readSchedule(filePath); + return { filePath, schedule, dataDate: schedule.project.dataDate?.getTime() || 0 }; + }); + + // Group by matchProjects clusters (greedy). + const groups = []; + for (const item of parsed) { + let placed = false; + for (const group of groups) { + const probe = engine.matchProjects(group[0].schedule, item.schedule); + if (probe.decision !== "different") { + group.push(item); + placed = true; + break; + } + } + if (!placed) groups.push([item]); + } + + const narrativePath = ["narrative.txt", "northstar-narrative.txt", "narrative.md"] + .map(name => path.join(dir, name)) + .find(p => fs.existsSync(p)); + const narrative = narrativePath ? fs.readFileSync(narrativePath, "utf8") : ""; + + const rows = []; + let anyContradiction = false; + for (const group of groups) { + group.sort((a, b) => a.dataDate - b.dataDate); + for (let i = 1; i < group.length; i += 1) { + const previous = group[i - 1].schedule; + const current = group[i].schedule; + try { + const result = comparePair(previous, current, narrative); + anyContradiction = anyContradiction || result.contradiction; + rows.push({ + project: result.project, + previous_date: result.dataDatePrevious, + current_date: result.dataDateCurrent, + finish_previous: result.finishPrevious, + finish_current: result.finishCurrent, + days_moved: result.finishMovement, + narrative_claim: result.narrativeClaim, + contradiction: result.contradiction, + }); + } catch (error) { + fail(error.message || String(error)); + } + } + } + + const header = "project,previous_date,current_date,finish_previous,finish_current,days_moved,narrative_claim,contradiction"; + let output; + if (format === "json") output = `${JSON.stringify(rows, null, 2)}\n`; + else { + const lines = [header, ...rows.map(row => [ + row.project, + row.previous_date, + row.current_date, + row.finish_previous, + row.finish_current, + row.days_moved, + JSON.stringify(row.narrative_claim || ""), + row.contradiction, + ].join(","))]; + output = `${lines.join("\n")}\n`; + } + + if (args.out) fs.writeFileSync(args.out, output); + else process.stdout.write(output); + process.exit(anyContradiction ? 1 : 0); +} + +function main() { + const args = parseArgs(process.argv.slice(2)); + const command = args._[0]; + if (command === "compare") return cmdCompare(args); + if (command === "batch") return cmdBatch(args); + fail("Usage: projectlens compare|batch ..."); +} + +main(); diff --git a/docs/USE_ON_YOUR_OWN_SCHEDULES.md b/docs/USE_ON_YOUR_OWN_SCHEDULES.md new file mode 100644 index 0000000..3fc2991 --- /dev/null +++ b/docs/USE_ON_YOUR_OWN_SCHEDULES.md @@ -0,0 +1,87 @@ +# Use ProjectLens on your own schedules + +Give ProjectLens two exports of the same schedule, one previous and one current, plus the written progress update. Use Primavera P6 XER/XML or MS Project XML. + +You get the finish movement, the exact sentence and highlighted phrase behind a finding, and both dates. An explained move stays a review of the schedule facts. A mismatch without a finish move asks you to check the published date. These are review prompts, not proof of cause or approval. + +Files stay on your machine. No account or upload is needed. + +## 1. Quickest route: command line + +From the repository root, with Node.js 18 or later, paste your update into a text file and supply two exports: + +```bash +cat > /tmp/projectlens-update.txt <<'TEXT' +Paste your written progress update here. +TEXT +node bin/projectlens.mjs compare \ + --previous path/to/previous.xer \ + --current path/to/current.xer \ + --narrative /tmp/projectlens-update.txt \ + --format text +``` + +For a working synthetic example, use `examples/monthly/northstar-previous.xer` and `examples/monthly/northstar-current.xer`, and paste `The programme remains on track.` The same command reports a 73-day finish movement, quotes the sentence, marks `**remains on track**`, and exits 1. + +Formats: `text`, `json`, `csv`, `md`. Text and Markdown show the quote; JSON includes structured `claims.evidence`. CSV keeps its history columns. Use `--project ` for multi-project XERs. CLI narrative files must be `.txt` or `.md`; convert Word text first. + +**Accuracy:** set 4 is **28/30, seen**, reproduced with `npm run bench`. Set 5's independent score is **pending** because no set 5 file is available here. [Cases, labels and sources](../bench/real-cases/) are public. Sets 1–4 informed the rules; do not treat them as unseen accuracy. + +## 2. Browser + +1. Open [change assurance](change-assurance.html) (or serve `docs/` locally). +2. Export two schedules from Primavera P6 as **XER** or **XML**, or from MS Project as **XML** (File → Save As → XML). Do not load `.mpp` directly. +3. Choose **Use your own schedules**, pick previous and current files, paste the narrative (or load `.txt` / `.md` / `.docx` on schedule review). +4. Select **Check decision readiness**. If activity codes overlap but names or IDs differ, confirm the match when asked. Multi-project files ask which project to use. + +Local server: + +```bash +python3 -m http.server 8000 --bind 127.0.0.1 --directory docs +# open http://127.0.0.1:8000/change-assurance.html +``` + +## 3. Monthly batch + +Put successive exports for one or more projects in a folder (plus an optional `narrative.txt`): + +```bash +node bin/projectlens.mjs batch --dir examples/monthly --format csv --out history.csv +``` + +Files are grouped by activity-code overlap, ordered by data date, and each consecutive pair writes one history row: + +`project,previous_date,current_date,finish_previous,finish_current,days_moved,narrative_claim,contradiction` + +## Export tips + +| Tool | Format | How | +|---|---|---| +| Primavera P6 | XER or XML | File → Export → Primavera XER, or XML | +| MS Project | XML (MSPDI) | File → Save As → XML | +| MS Project `.mpp` | Not accepted | Export as XML first | +| Narrative | `.txt`, `.md`, `.docx` | Paste text, or load the file in schedule review | + +## What it checks + +- Scheduled finish movement against stability / move wording in the narrative +- Activity finish, float, constraint and relationship differences +- Ownership gaps when mitigation language has no owner or due date + +## What it does not check + +- Cause, entitlement or contractual approval +- A recalculated critical path (it uses exported float only) +- Whether published government commentary is “wrong”; a mismatch says the published commentary and date disagree + +## Privacy + +Browser and CLI keep files local. The static site does not probe localhost for APIs. The optional precedent sidecar receives narrative text only, never the schedule file. + +## Exit codes (CLI) + +| Code | Meaning | +|---|---| +| 0 | Comparison finished; no narrative/date contradiction | +| 1 | Comparison finished; at least one contradiction | +| 3 | Input error (missing file, unsupported format, parse failure) | diff --git a/docs/app.js b/docs/app.js index 24cc540..f3d13d9 100644 --- a/docs/app.js +++ b/docs/app.js @@ -268,13 +268,30 @@ function openProject(projectId) { $("#detailReasons").innerHTML = project.attentionReasons.length ? project.attentionReasons.map(reason => `
  • ${escapeHtml(reason)}
  • `).join("") : "
  • No elevated scoring signal. Open the evidence for context.
  • "; - $("#detailEvidence").textContent = project.evidenceExcerpt || "No public narrative was available for this record."; + const claimDates = { currentFinish: project.endDate, previousFinish: project.previous?.endDate }; + const claims = ProjectLensEngine.detectScheduleClaims(project.scheduleNarrative || project.narrativeExcerpt || "", claimDates); + const sentence = ProjectLensEngine.findingSentence(claims, claimDates); + const claimFlag = sentence && !claims.publishedDateCheck + ? `

    ${escapeHtml(sentence)}

    ` + : ""; + // Quieter than a contradiction: narrative end date and published end date disagree, but the finish did not move. + const dateCheck = claims.publishedDateCheck + ? `

    ${escapeHtml(sentence)}

    ` + : ""; + const evidence = claims.evidence; + const claimEvidence = evidence + ? `
    ${evidence.sentence.split(evidence.phrase).map(escapeHtml).join(`${escapeHtml(evidence.phrase)}`)}

    Previous finish: ${escapeHtml(formatDate(evidence.previousFinish))}. Current finish: ${escapeHtml(formatDate(evidence.currentFinish))}.

    ` + : ""; + const narrativeDetails = project.narrativeExcerpt || project.scheduleNarrative + ? `
    Full schedule narrative

    ${escapeHtml(project.narrativeExcerpt || project.scheduleNarrative)}

    ` + : ""; + $("#detailEvidence").innerHTML = `${claimFlag}${dateCheck}${claimEvidence}

    ${escapeHtml(project.evidenceExcerpt || "No public narrative was available for this record.")}

    ${narrativeDetails}`; $("#detailSource").href = project.sourceUrl; $("#detailTimeline").innerHTML = project.history.map(record => `
    -
    ${escapeHtml(record.deliveryConfidence || "Not published")}${escapeHtml(record.deliveryConfidenceSource || "No rating source")} · ${escapeHtml(formatDate(record.endDate))}

    ${escapeHtml(record.evidenceExcerpt || "No narrative published.")}

    Source ↗
    +
    ${escapeHtml(record.deliveryConfidence || "Not published")}${escapeHtml(record.deliveryConfidenceSource || "No rating source")} · ${escapeHtml(formatDate(record.endDate))}${record.narrativeSaysUnchangedButMoved ? " · narrative/date conflict" : ""}

    ${escapeHtml(record.evidenceExcerpt || "No narrative published.")}

    ${record.narrativeExcerpt ? `
    Full schedule narrative

    ${escapeHtml(record.narrativeExcerpt)}

    ` : ""}Source ↗
    `).join(""); $("#detailThemes").innerHTML = project.themes.map(theme => `${escapeHtml(theme)}`).join("") || "No theme signal"; const dialog = $("#projectDialog"); diff --git a/docs/change-assurance.html b/docs/change-assurance.html index f23a994..9d52b71 100644 --- a/docs/change-assurance.html +++ b/docs/change-assurance.html @@ -119,13 +119,13 @@

    Follow one complete review

    - +
    + + + + diff --git a/docs/change-assurance.js b/docs/change-assurance.js index d325f32..cf864f4 100644 --- a/docs/change-assurance.js +++ b/docs/change-assurance.js @@ -74,199 +74,15 @@ function escapeHtml(value) { }[character])); } -function numberValue(value) { - if (value === null || value === undefined || value === "") return null; - const parsed = Number(String(value).replace(/,/g, "")); - return Number.isFinite(parsed) ? parsed : null; -} - -function parseDate(value) { - if (!value) return null; - const clean = String(value).trim(); - const isoMatch = clean.match(/^(\d{4})-(\d{2})-(\d{2})/); - if (isoMatch) return new Date(`${isoMatch[1]}-${isoMatch[2]}-${isoMatch[3]}T12:00:00Z`); - const timestamp = Date.parse(clean); - return Number.isNaN(timestamp) ? null : new Date(timestamp); -} - -function formatDate(value) { - const date = value instanceof Date ? value : parseDate(value); - return date ? new Intl.DateTimeFormat("en-GB", { day: "numeric", month: "short", year: "numeric", timeZone: "UTC" }).format(date) : "Not supplied"; -} - -function dayDifference(current, previous) { - if (!current || !previous) return null; - return Math.round((current.getTime() - previous.getTime()) / 86400000); -} - -function parseXer(text, fileName) { - if (!text?.trim()) throw new Error(`${fileName} is empty.`); - const tables = {}; - let tableName = ""; - let fields = []; - - text.replace(/^\uFEFF/, "").replace(/\r\n?/g, "\n").split("\n").forEach(line => { - if (!line) return; - const cells = line.split("\t"); - const marker = cells[0].trim(); - if (marker === "%T") { - tableName = (cells[1] || "").trim().toUpperCase(); - if (tableName) tables[tableName] ||= []; - fields = []; - } else if (marker === "%F" && tableName) { - fields = cells.slice(1).map(field => field.trim()); - } else if (marker === "%R" && tableName && fields.length) { - const record = {}; - fields.forEach((field, index) => { record[field] = cells[index + 1] ?? ""; }); - tables[tableName].push(record); - } - }); - - if (!tables.PROJECT?.length || !tables.TASK?.length) throw new Error(`${fileName} is not a readable Primavera P6 schedule file (XER).`); - if (tables.PROJECT.length !== 1) throw new Error(`${fileName} contains multiple projects. Export a single project for change assurance, or use the detailed schedule review to inspect first-project scope.`); - - const project = tables.PROJECT[0]; - if (!project.proj_id?.trim()) throw new Error(`${fileName} has no project ID. Export a single-project schedule file (XER) and retry.`); - const tasks = tables.TASK.map(row => ({ - code: row.task_code || row.task_id, - name: row.task_name || row.task_code || row.task_id, - finish: parseDate(row.early_end_date || row.target_end_date || row.act_end_date), - float: numberValue(row.total_float_hr_cnt), - constraint: row.constraint_type || row.cstr_type || "", - constraintDate: parseDate(row.cstr_date || row.constraint_date), - })); - if (tasks.some(task => !task.code) || new Set(tasks.map(task => task.code)).size !== tasks.length) throw new Error(`${fileName} needs unique, non-empty activity codes for comparison.`); - if (!parseDate(project.scd_end_date || project.plan_end_date)) throw new Error(`${fileName} has no supported project scheduled finish. Export a calculated single-project schedule and retry.`); - const codeById = new Map((tables.TASK || []).map(row => [row.task_id, row.task_code || row.task_id])); - const relations = (tables.TASKPRED || []).map(row => JSON.stringify([codeById.get(row.pred_task_id) || row.pred_task_id, codeById.get(row.task_id) || row.task_id, row.pred_type || "Not supplied", numberValue(row.lag_hr_cnt)])); - - return { - fileName, - sourceText: text.replace(/\r\n?/g, "\n").trim(), - project: { - id: project.proj_id || "unassigned", - name: project.proj_short_name || project.proj_name || "Unnamed project", - dataDate: parseDate(project.last_recalc_date || project.data_date), - scheduledFinish: parseDate(project.scd_end_date || project.plan_end_date), - }, - tasks, - taskByCode: new Map(tasks.map(task => [task.code, task])), - relations: new Set(relations), - }; -} -function taskChanges(previous, current) { - const codes = new Set([...previous.taskByCode.keys(), ...current.taskByCode.keys()]); - const changes = []; - const activityEvidence = []; - const snapshot = task => task ? { finish: formatDate(task.finish), totalFloatHours: task.float, constraintType: task.constraint || "None", constraintDate: formatDate(task.constraintDate) } : null; - let constraintChanges = 0; - let floatErosion = 0; - - codes.forEach(code => { - const before = previous.taskByCode.get(code); - const after = current.taskByCode.get(code); - if (!before || !after) { - activityEvidence.push({ code, name: (after || before).name, before: snapshot(before), after: snapshot(after) }); - changes.push({ code, name: (after || before).name, summary: after ? "Activity added" : "Activity removed" }); - return; - } - const finishDelta = dayDifference(after.finish, before.finish); - const constraintChanged = `${before.constraint}|${formatDate(before.constraintDate)}` !== `${after.constraint}|${formatDate(after.constraintDate)}`; - const floatDelta = before.float !== null && after.float !== null ? after.float - before.float : null; - if (finishDelta || constraintChanged || (floatDelta !== null && floatDelta !== 0)) activityEvidence.push({ code, name: after.name, before: snapshot(before), after: snapshot(after) }); - if (constraintChanged) constraintChanges += 1; - if (floatDelta !== null && floatDelta < 0) floatErosion += 1; - if ((finishDelta && Math.abs(finishDelta) >= 7) || constraintChanged || (floatDelta !== null && floatDelta <= -8)) { - const evidence = []; - if (finishDelta) evidence.push(`finish ${finishDelta > 0 ? "+" : ""}${finishDelta}d`); - if (constraintChanged) evidence.push("constraint changed"); - if (floatDelta !== null && floatDelta < 0) evidence.push(`float ${floatDelta}h`); - changes.push({ code, name: after.name, summary: evidence.join(" · ") }); - } - }); - - const relationEvidence = [...new Set([...previous.relations, ...current.relations])].filter(signature => previous.relations.has(signature) !== current.relations.has(signature)).map(signature => { - const [predecessor, successor, type, lagHours] = JSON.parse(signature); - return { change: current.relations.has(signature) ? "Added" : "Removed", predecessor, successor, type, lagHours }; - }); - const relationChanges = relationEvidence.length; - return { changes, activityEvidence, relationEvidence, constraintChanges, floatErosion, relationChanges }; -} - -function analyseReview(previous, current, narrative) { - if (previous.project.name !== current.project.name) throw new Error("The project names differ. Choose previous and current exports of the same project before comparing."); - if (previous.project.id !== current.project.id) throw new Error("The project IDs differ. Choose exports of the same source project; re-imported projects with new IDs are not supported by this comparison."); - if (previous.sourceText === current.sourceText) throw new Error("These exports contain identical evidence. Choose a previous and a current schedule, then retry."); - if (!previous.project.dataDate || !current.project.dataDate) throw new Error("Both exports need a supported project data date before comparison."); - if (current.project.dataDate < previous.project.dataDate) throw new Error("The current data date precedes the previous export. Swap the files and retry."); - const finishMovement = dayDifference(current.project.scheduledFinish, previous.project.scheduledFinish); - const changes = taskChanges(previous, current); - const text = narrative.toLowerCase(); - // These are bounded text prompts, not a judgement that a claim is true. - // Exclude explicit local negations such as "not on track" before matching. - const stabilityText = text.replace(/\b(?:not|never|no longer)\s+(?:\w+\s+){0,3}(?:on track|unchanged|as planned|stable)\b/g, ""); - const statedStable = /\b(unchanged|no material change|on track|as planned|remains stable|no impact)\b/.test(stabilityText); - const blockers = []; - const coverage = [previous, current].map(schedule => ({ file: schedule.fileName, tasks: schedule.tasks.length, finishDates: schedule.tasks.filter(task => task.finish !== null).length, floatValues: schedule.tasks.filter(task => task.float !== null).length })); - if (coverage.some(item => item.finishDates !== item.tasks || item.floatValues !== item.tasks)) blockers.push({ type: "Evidence gap", title: "Some activity finish dates or float values could not be compared", detail: coverage.map(item => `${item.file}: ${item.finishDates}/${item.tasks} finishes and ${item.floatValues}/${item.tasks} float values`).join("; ") }); - - if (!narrative.trim()) { - blockers.push({ - type: "Evidence gap", - title: "No change narrative was supplied", - detail: "The schedules can show movement, but not the stated reason, mitigation or approval basis.", - }); - } - if (statedStable && finishMovement >= 7) { - blockers.push({ - type: "Contradiction", - title: `The finish moved ${finishMovement} days and the update needs clarifying`, - detail: `${formatDate(previous.project.scheduledFinish)} → ${formatDate(current.project.scheduledFinish)}.`, - }); - } else if (finishMovement !== null && Math.abs(finishMovement) >= 7) { - blockers.push({ type: "Schedule movement", title: `The scheduled finish moved ${finishMovement > 0 ? "+" : ""}${finishMovement} days`, detail: "Check the reason and supporting evidence. Mentioning the movement does not verify its cause." }); - } - if (changes.constraintChanges) { - blockers.push({ - type: "Unexplained change", - title: `${changes.constraintChanges} constraint changes need review`, - detail: "Constraint type or date changed. Inspect the source fields and the instruction supporting each change; narrative wording does not close this review question.", - }); - } - if (changes.relationChanges) { - blockers.push({ - type: "Unexplained change", - title: `${changes.relationChanges} links between tasks changed`, - detail: "Added or removed links between tasks (which task waits for which) can change the order of work. Ask which instruction explains the differences; these exports do not establish causation.", - }); - } - if (changes.floatErosion) { - blockers.push({ - type: "Float loss", - title: `Less spare time before the finish moves (float) on ${changes.floatErosion} changed activities`, - detail: "The current schedule shows less total float: these activities can slip less before they delay the finish. Check the underlying fields and planning assumptions; this does not prove a delay or a critical path.", - }); - } - const explicitMissingOwnership = /\b(?:no|without|missing|unassigned)\s+(?:named\s+)?(?:owner|due date)\b|\b(?:owner|due date)\s+(?:is\s+)?(?:missing|unassigned|unknown|not set)\b/.test(text); - if (explicitMissingOwnership || (/\b(manage\w*|mitigat\w*|governance|action)\b/.test(text) && !/\b(owner|responsible|accountable|due|by \d{1,2})\b/.test(text))) { - blockers.push({ - type: "Ownership gap", - title: "The stated response has no named owner or due date", - detail: "Name an owner and a date so someone can follow the mitigation up.", - }); - } - - return { - previous, - current, - finishMovement, - changes, - blockers, - coverage, - generatedAt: new Date().toISOString(), - }; -} +// Engine bindings: schedule parsing and review live in ProjectLensEngine. +const parseXer = (text, fileName, options) => ProjectLensEngine.parseXerAssurance(text, fileName, options); +const taskChanges = (...args) => ProjectLensEngine.taskChanges(...args); +const analyseReview = (...args) => ProjectLensEngine.analyseReview(...args); +const numberValue = (...args) => ProjectLensEngine.numberValue(...args); +const parseDate = (...args) => ProjectLensEngine.parseDate(...args); +const formatDate = (...args) => ProjectLensEngine.formatDate(...args); +const dayDifference = (...args) => ProjectLensEngine.dayDifference(...args); function showToast(message) { const toast = $("#assuranceToast"); @@ -605,11 +421,25 @@ function questionFor(blocker) { async function loadFile(kind, file) { if (!file) return; - if (!/\.xer$/i.test(file.name)) { - showError("Choose a Primavera P6 .xer file, then run the check again."); + if (/\.mpp$/i.test(file.name)) { + showError("Export this schedule from MS Project as XML (File > Save As > XML) and load that"); + return; + } + if (!/\.(xer|xml)$/i.test(file.name)) { + showError("Choose a Primavera P6 .xer/.xml or MS Project XML file, then run the check again."); return; } - assuranceState.files[kind] = { name: file.name, text: await file.text() }; + const bytes = new Uint8Array(await file.arrayBuffer()); + let text; + let encoding = "utf-8"; + if (/\.xml$/i.test(file.name)) { + text = new TextDecoder("utf-8").decode(bytes); + } else { + const decoded = ProjectLensEngine.decodeXerBytes(bytes); + text = decoded.text; + encoding = decoded.encoding; + } + assuranceState.files[kind] = { name: file.name, text, encoding, projectId: null }; assuranceState.originalNarrative = null; const label = kind === "previous" ? $("#assurancePreviousName") : $("#assuranceCurrentName"); label.textContent = file.name; @@ -619,16 +449,56 @@ async function loadFile(kind, file) { $("#intakeMessage").textContent = ready ? "Both files loaded. Ready to check." : "Choose the second schedule file to continue."; } -async function runReview() { +async function parseWithProjectPicker(kind) { + const file = assuranceState.files[kind]; + const projects = ProjectLensEngine.listProjects(file.text); + let projectId = file.projectId; + if (projects.length > 1 && !projectId) { + const listing = projects.map((p, i) => `${i + 1}. ${p.shortName} (${p.projId}, ${p.activityCount} activities)`).join("\n"); + const choice = window.prompt(`This file contains ${projects.length} projects. Enter the number to use:\n\n${listing}`, "1"); + if (!choice) throw new Error("Choose a project in the multi-project export before comparing."); + const index = Number(choice) - 1; + if (!projects[index]) throw new Error("That project number is not in the list."); + projectId = projects[index].projId; + file.projectId = projectId; + } + if (/\.xml$/i.test(file.name)) { + const xml = file.text; + if (/ !item ? "Activity absent" : constraintFinding ? `${item.constraintType} · ${item.constraintDate}` : floatFinding ? `${item.totalFloatHours ?? "Not supplied"} hours total float` : item.finish; const activityRows = relevant.map(change => `
  • ${escapeHtml(change.code)} ${escapeHtml(change.name)}
    Previous: ${escapeHtml(value(change.before))}
    Current: ${escapeHtml(value(change.after))}
  • `).join("") || "
  • No supporting activity changes found.
  • "; const relationshipRows = review.changes.relationEvidence.map(relation => `
  • ${escapeHtml(relation.change)}: ${escapeHtml(relation.predecessor)} → ${escapeHtml(relation.successor)}
    Type: ${escapeHtml(relation.type)} · lag: ${relation.lagHours === null ? "Not supplied" : `${escapeHtml(relation.lagHours)} hours`}
  • `).join(""); + const evidence = review.claims.evidence; + const quotation = evidence + ? evidence.sentence.split(evidence.phrase).map(escapeHtml).join(`${escapeHtml(evidence.phrase)}`) + : escapeHtml($("#assuranceNarrative").value || "No narrative supplied."); $("#findingEvidence").innerHTML = `

    ${escapeHtml(finding?.title || "Schedule evidence")}

    @@ -1029,7 +903,8 @@ function renderSelectedFinding(index) {
    Previous finish
    ${escapeHtml(formatDate(review.previous.project.scheduledFinish))}
    Current finish
    ${escapeHtml(formatDate(review.current.project.scheduledFinish))}
    Inspect source files and fields

    Sources: ${escapeHtml(evidenceVersion(review))} · PROJECT scheduled finish; TASK activity dates, constraints and total float.

    ${relationshipFinding ? `Task link field evidence (${review.changes.relationEvidence.length})` : `Activity field evidence (${relevant.length})`}
      ${relationshipFinding ? relationshipRows : activityRows}
    -

    Narrative under review

    ${escapeHtml(($("#assuranceNarrative").value.split(/\n\s*\n/).find(paragraph => /unchanged|on track|stable|no impact/i.test(paragraph)) || $("#assuranceNarrative").value || "No narrative supplied.").trim())}
    Read full narrative

    ${escapeHtml($("#assuranceNarrative").value || "No narrative supplied.")}

    + ${review.claim ? `

    ${escapeHtml(review.claim)}

    ` : ""} +

    Narrative under review

    ${quotation}
    Read full narrative

    ${escapeHtml($("#assuranceNarrative").value || "No narrative supplied.")}

    ${assuranceState.originalNarrative !== null && assuranceState.originalNarrative !== $("#assuranceNarrative").value ? `
    Read original narrative from the first check

    ${escapeHtml(assuranceState.originalNarrative || "No narrative was supplied at the first check.")}

    ` : ""}

    Field coverage: ${review.coverage.map(item => `${escapeHtml(item.file)}: ${item.finishDates}/${item.tasks} finishes, ${item.floatValues}/${item.tasks} float values`).join("; ")}. Fixed checks flag conflicts. They do not establish causation, entitlement or contractual approval.

    `; } diff --git a/docs/data/gmpp.json b/docs/data/gmpp.json index 449ab6f..4d98fae 100644 --- a/docs/data/gmpp.json +++ b/docs/data/gmpp.json @@ -1 +1 @@ -{"meta":{"generated":"2026-07-15T03:58:13+01:00","latestSnapshot":"2026-03-31","method":"Deterministic year-on-year comparison with transparent keyword theme signals","limitations":["Delivery Confidence Assessments are point-in-time judgements, not final outcomes.","Narrative themes are keyword signals and do not establish causation.","Whole-life cost values are not compared across years because reporting price bases can differ.","Missing and exempt values are excluded from like-for-like transitions.","Absence from the latest release does not establish delivery success or failure."]},"summary":{"latestProjects":189,"historyRecords":1417,"matchedLatest":170,"allFourYears":129,"allReleaseYears":35,"transitions":{"Unchanged":103,"Improved":30,"Worsened":18,"Not comparable":38},"ratingCounts":{"Red":34,"Amber":109,"Green":29,"Not published":17},"ratingSourceCounts":{"Independent assurance":81,"SRO Q4 assessment":91,"Not published":17},"topThemes":[{"theme":"Cost & funding","count":164},{"theme":"Delivery & schedule","count":164},{"theme":"Governance & assurance","count":90},{"theme":"Commercial & supply chain","count":87},{"theme":"Approvals & decisions","count":67},{"theme":"Scope & requirements","count":40},{"theme":"Workforce & capability","count":29},{"theme":"Technical & integration","count":24}],"comparability":{"2020-2021":85,"2021-2022":159,"2022-2023":206,"2023-2024":191,"2024-2025":198,"2025-2026":170},"latestLeavers":43,"reportedLatestLeavers":42,"leaverCountDifference":1},"taxonomy":{"Approvals & decisions":["approval","business case","planning decision","consent","decision","review note","spending review","authorisation","authorization"],"Workforce & capability":["workforce","resource","resourcing","capacity","skills","recruit","crew","staff","capability","training"],"Commercial & supply chain":["supplier","supply chain","commercial","contract","procurement","tender","market","inflation","affordability"],"Scope & requirements":["scope","requirement","design","specification","strategic direction","change control","rebaseline","re-baseline","reset"],"Governance & assurance":["governance","assurance","accountability","oversight","review","sro","programme board"],"Technical & integration":["technical","technology","integration","engineering","testing","digital","data","migration","interoperability"],"Delivery & schedule":["schedule","delay","milestone","delivery","timetable","completion","progress","pace","critical path","slippage"],"Cost & funding":["cost","budget","funding","finance","financial","whole life","spend","expenditure"]},"sources":[{"year":2020,"file":"gmpp_2019_20.csv","label":"IPA Annual Report 2019-20","url":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2020"},{"year":2021,"file":"gmpp_2020_21.csv","label":"IPA Annual Report 2020-21","url":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021"},{"year":2022,"file":"gmpp_2021_22.csv","label":"IPA Annual Report 2021-22","url":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022"},{"year":2023,"file":"gmpp_2022_23.csv","label":"IPA Annual Report 2022-23","url":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23"},{"year":2024,"file":"gmpp_2023_24.csv","label":"IPA Annual Report 2023-24","url":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24"},{"year":2025,"file":"gmpp_2024_25.csv","label":"NISTA Annual Report 2024-25","url":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025"},{"year":2026,"file":"gmpp_2025_26.csv","label":"NISTA Major Projects Annual Report 2025-26","url":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26"}],"externalSources":[{"label":"Major projects data archive","type":"Historic disclosure","url":"https://www.gov.uk/government/collections/major-projects-data","use":"Earlier annual and departmental releases back to 2013"},{"label":"UK Infrastructure Pipeline","type":"Forward look","url":"https://www.gov.uk/government/publications/uk-infrastructure-pipeline","use":"Status, expected completion and anticipated investment"},{"label":"NAO major-project value review","type":"Independent scrutiny","url":"https://www.nao.org.uk/insights/delivering-value-from-government-investment-in-major-projects/","use":"Benefits, outcomes and recurring delivery lessons"},{"label":"Public Accounts Committee value inquiry","type":"Parliamentary scrutiny","url":"https://publications.parliament.uk/pa/cm5804/cmselect/cmpubacc/456/report.html","use":"Evidence on whether outputs translated into public value"},{"label":"Contracts Finder","type":"Commercial evidence","url":"https://www.contractsfinder.service.gov.uk/Search","use":"Procurement notices, awards and supplier opportunities"},{"label":"Evaluation Registry","type":"Outcome evidence","url":"https://evaluation-registry.cabinetoffice.gov.uk/","use":"Registered government evaluations and published findings"}],"projects":[{"id":"MOD_0104_1617-Q1","year":2026,"name":"ARMOUR MBT 2025","department":"MOD","category":"Military Capability","description":"The Armour Main Battle Tank (MBT) Programme will deliver the Challenger 3 capability. Challenger 3 will be Defence’s only guaranteed, 24 hr, all weather, mobile anti-tank capability. This programme will modernise and improve the British Army’s MBTs to the standard needed on today’s battlefield. Key elements include enhanced survivability, greater lethality, improved surveillance and target acquisition as well as removing obsolescence. The currently forecasted out of service date is 2040 but this is likely to be extended beyond this date to ensure value for money.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 decreased to Red. This is primarily due to the following factors. 1. Forecast delays and risk to Initial Operating Capability and Full Operating capability in delivery from the Prime Contractor. 2. Demonstration phase trials are still progressing to prove the performance of the tank but the time taken to do this is likely to impact on training and familiarisation","startDate":"2014-12-04","endDate":"2032-10-11","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 22/05/2031. This is primarily due to the following factors. 1. This forecast date remains subject to confirmation and could be subject to change if anticipated delays in equipment deliveries are encountered.","fyBaseline":204.59,"fyForecast":136.48,"fyVariance":33.29,"varianceNarrative":"The in-year variance exceeds 5%. This is primarily due to the following factors. 1. Reprofiling into future years, underlying cost movements, and, Foreign Exchange rate changes. 2. The key decreases relate to the anticipated delays in deliveries from the Prime Contractor. 3. Costings for 25/26 reflect the latest forecast and not the revised delivery schedule. These adjustments will be presented for approval in due course.","wholeLifeCost":1979.22,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) increased from £1916.53M to £1944.09M. This is primarily due to the following factors. 1. Adjustments to reflect the anticipated delays in deliveries from the Prime Contractor. A revised costing profile is expected in Q1 26/27.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. The project's departmentally agreed Benefits WLT is unchanged.","themes":["Cost & funding","Delivery & schedule","Workforce & capability","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 decreased to Red. This is primarily due to the following factors. 1. Forecast delays and risk to Initial Operating Capability and Full Operating capability in delivery from the Prime Contractor. 2. Demonstration phase trials are still progressing to…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"MOD_0104_1617-Q1","year":2020,"name":"Armour MBT 2025","department":"MOD","category":"Military Capability","description":"An extension of the Army's MBT capability as part of a balanced force, credible and employable against current and emerging threats, across the mosaic of conflict, and the identification of future capability options beyond 2035.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber, which has not changed since last year�s Q2 1819 Amber, due primarily to the following factors; - During this period the Armour MBT 2025 programme concluded its competitive, obsolescence only, assessment phase prior to entering an Investment Approvals Committee (IAC) / HM Treasury (HMT) approved expanded assessment phase to assess enhancements to lethality and survivability. At this early stage in the project lifecycle whilst the scope, risks and opportunities are being assessed and evaluated, the maintenance of an amber grade remains appropriate. - In the obsolescence only assessment phase Rheinmetall Landsysteme (RLS) conducted significant technical risk reduction work; this has improved confidence in platform delivery. The programme however is complex, with a number of ley dependencies; as such it is more than simply the delivery of the tank. Given programme complexity an amber grade remains appropriate. Since the Q2 1920 (30th September 2019) Amber IPA DCA, the following non-project operating environment activities have impacted the original Q2 IPA DCA; - COVID 19 is having an impact. Working from home and COVID 19 control measures could reduce and delay the provision of evidence for the full business case submission. Since the Q2 1920 (30th September 2019) Amber IPA DCA, the following primary project actions have impacted the original Q2 IPA DCA; - The programme is currently clarifying and negotiating the Rheinmetall BAE Systems Land (RBSL) tender return. The outcome of which will either have a positive or negative impact on performance, cost and time. It is too early to draw a conclusion. - Rheinmetall BAE Systems Land (RBSL) delivered both their report at the end of the second assessment phase and their tender return on time. This has therefore had a neutral impact on the DCA. - A number of the risks have been mitigated since the last IPA DCA. Although this is positive, risks remain and work continues to either resolve or mitigate them.","startDate":"2014-12-04","endDate":"2028-07-31","scheduleNarrative":"The scheduled baseline project end date at Q2 1920 (30th September 2019) is 31/07/28, has lengthened by 791 days since last year's Q2 1819 date of 01/06/26, due primarily to the following factors; - In this period the programme's scope was expanded from obsolescence only to include enhancements to its lethality and survivability. The expanded scope has also lengthened the time to complete the work and increased cost over the assessment, demonstration and manufacture phases. These dates are currently subject to negotiation and will be confirmed when the full business case has been approved. Since the Q2 1920 (30th September 2019) baseline project end date of 31/07/28, the following non-project operating environment activities have impacted the original Q2 baseline project end date; - Currently the impact of COVID 19 on the programme end date is unknown. Other non-project activities have not had an impact. Since the Q2 1920 (30th September 2019) baseline project end date of 31/07/28, the following primary project actions have impacted the original Q2 baseline project end date; - The change in dates are purely as a result of the expanded scope, as explained above.","fyBaseline":12.46,"fyForecast":11.95,"fyVariance":-4.0,"varianceNarrative":"Budget variance less than 5%","wholeLifeCost":1304.19,"costNarrative":"The baseline Whole Life Cost at Q2 1920 (30th September 2019) is �1,304.19 m, due primarily to the following factors; - This reflects the financial position following the capability uplift endorsed by HMT. This sees a capability uplift and extension to the Main Battle Tank out to 2035.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Scope & requirements","Approvals & decisions"],"evidenceExcerpt":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber, which has not changed since last year�s Q2 1819 Amber, due primarily to the following factors; - During this period the Armour MBT 2025 programme concluded its competitive, obsolescence only, assessment phase prior to entering an Investment Approvals Committee…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2020","sourceLabel":"IPA Annual Report 2019-20"},{"id":"MOD_0104_1617-Q1","year":2021,"name":"Armour Main Battle Tank","department":"MOD","category":"Military Capability","description":"The Armour Main Battle Tank Programme is the extension of the Army's Main Battle Tank capability as part of a balanced force, credible and employable against current and emerging threats until an extended out of service date out to at least 2040. This will be achieved through a series of projects to extend the life of the current platform to deliver Challenger 3. These projects will fall under the governance of the overall Armour Main Battle Tank Programme. They include addressing obsolescence, lethality and survivability. Mobility is being addressed through a separate pan-platform project.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber. This is primarily due to the following factors: With the recent progress in approval of the Full Business Case and subsequent contract awarded to Rheinmetall and BAES Land, I remain confident that this Programme can deliver to cost, time and performance. However, the Infrastructure and Projects Authority will have the opportunity to review the delivery confidence on during their next review in late 2021. In parallel options are being investigated to accelerate the schedule.","startDate":"2017-12-18","endDate":"2026-06-01","scheduleNarrative":"Compared to financial year 19/20-Q2, the project's end-date remained scheduled to finish on 01 June 2026 . This is primarily due to the following factors: Schedule dates have been revised during contract negotiation contract signature in March 21. Key milestones (50% confidence) are: - Initial Operating Capability (1 squadron of 18 tanks with crews trained at appropriate collective training standard) - November 27. - Full Operating Capability (148 tanks delivered): November 30. These dates are later than envisaged at Initial Gate. This slip has arisen during contractual negotiations due to the perception in Industry of delivery and cost risk around the Design and Manufacture phases, reflecting that which has been witnessed from other projects.","fyBaseline":9.4,"fyForecast":9.1,"fyVariance":-3.0,"varianceNarrative":"The budget variance is less than or equal to 5%. The Financial Year 20/21 forecast to budget variance of �7.968m (536%) reflects the authorised bring forward of costs from April 21 into March 21 due to an earlier than planned contract award.","wholeLifeCost":1399.17,"costNarrative":"Compared to financial year 19/20-Q2, the projects Baseline Whole Life Cost increased from �1304.19m to �1399.17m. This is primarily due to the following factors: This is due to the provision for the purchase of war stock ammunition under the Full Business Case approval. This budget was not previously included in previous estimates.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber. This is primarily due to the following factors: With the recent progress in approval of the Full Business Case and subsequent contract awarded to Rheinmetall and BAES Land, I remain confident that this Programme can deliver to…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21"},{"id":"MOD_0104_1617-Q1","year":2022,"name":"Armour MBT 2025","department":"MOD","category":"Military Capability","description":"The Armour Main Battle Tank Programme is the extension of the Army's Main Battle Tank capability as part of a balanced force, credible and employable against current and emerging threats until an extended out of service date out to at least 2040. This will be achieved through a series of projects to extend the life of the current platform to deliver Challenger 3. These projects will fall under the governance of the overall Armour Main Battle Tank Programme. They include addressing obsolescence, lethality and survivability. Mobility is being addressed through a separate pan-platform project.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber. This is primarily due to the following factors: The Defence in a Competitive Age Command Paper (CP411) published in March 2021 confirmed that the Army will invest around £1.3bn in our armoured capability by upgrading 148 of our main battle tanks to ensure the Challenger III will become one of the most protected and most lethal in Europe. The remaining fleet will be retired. Planning to realise this and explore opportunity for acceleration continues.","startDate":"2014-12-04","endDate":"2026-06-01","scheduleNarrative":"Compared to 2021-Q4, the project end-date remained scheduled to finish on 01 June 2026.","fyBaseline":65.55,"fyForecast":76.2,"fyVariance":16.0,"varianceNarrative":"The budget variance exceeds 5%. The Financial Year 21/22 forecast was £65.6M with the actual spend being £76.3M, giving a variance of £10.7M (a 16% positive variance to the original forecast of £65.6M). Most of the variance is due to a reprofile of the payment milestone associated with the Interim Design Review 2 being brought forward from Financial Year 22/23 to 21/22.","wholeLifeCost":1372.0,"costNarrative":"Compared to 2021-Q4, the projects Baseline Whole Life Cost decreased from 1407.14 (£m) to 1371.97 (£m). This is primarily due to the following factors: The financial position has changed since FY20/21 and was confirmed in the Full Business Case approved in Mar 21 as £1.422Bn. The new Approved Budgetary Limit now includes an additional £43M in the equipment programme (accounting for an increase in the demonstration and integration costs of a new ammunition nature) and a reduction in the support costs of £24M, that currently sits outside of the reported programme baseline whole-life cost of £1,371.966M.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber. This is primarily due to the following factors: The Defence in a Competitive Age Command Paper (CP411) published in March 2021 confirmed that the Army will invest around £1.3bn in our armoured capability by upgrading 148 of…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"MOD_0104_1617-Q1","year":2023,"name":"Armour MBT 2025","department":"MOD","category":"Military Capability","description":"The Armour Main Battle Tank Programme will deliver the Challenger 3 capability. Challenger 3 will be Defence's only guaranteed, 24 hr, all weather, mobile anti-tank capability. This programme will modernise and improve the British Army's Main Battle Tanks to the standard needed on today's battlefield. Upgrades include enhanced survivability; greater lethality, improved surveillance and target acquisition as well as removing obsolescence.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber (SRO rating). This is primarily due to the following factors. Global supply chain risks and key supplier issues that could impact delivery, and resource shortfalls and challenges to recruit the required skill and experience levels.","startDate":"2014-12-04","endDate":"2031-05-22","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 increased from 2026-06-01 to 2031-05-22. This is primarily due to the following factors. The end-date of June 2026 reflected the obsolesce scope of the original Challenger 2 Life Extension Project when it was established in 2015. This should have been adjusted in 2019 when the scope of the programme was increased to deliver a genuine capability uplift to Challenger 2. This effectively reset the Performance, Cost and Time envelope of the programme, and was further refined through the revised assessment phase and Full Business Case submission in November 2020. The end-date of May 2031 reflects Full Operating Capability being delivered by November 2030 at P50 confidence.","fyBaseline":107.86,"fyForecast":87.87,"fyVariance":-19.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors: Delays to Epsom Armour have impacted trials, ammunition integration work and along with supply chain issues, it has been necessary to defer payments until milestones are satisfied now expected in the Financial Year 23/24","wholeLifeCost":1435.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 increased from 1372m. to 1435m. This is primarily due to the following factors. Reprofiling into future years, also the recent initial pre-negotiated Epsom proposal being higher than originallyestimated","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This programme does not report cashable benefits. Its aim is to provision the armed forces with the equipment and / or infrastructure required.","themes":["Cost & funding","Workforce & capability","Commercial & supply chain","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber (SRO rating). This is primarily due to the following factors. Global supply chain risks and key supplier issues that could impact delivery, and resource shortfalls and challenges to recruit the required skill and experience levels. Compared to…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"MOD_0104_1617-Q1","year":2024,"name":"Armour MBT","department":"MOD","category":"Military Capability","description":"The Armour Main Battle Tank (MBT) Programme will deliver the Challenger 3 (CR3) capability. Challenger 3 will be Defence’s only guaranteed, 24 hr, all weather, mobile anti-tank capability. This programme will modernise and improve the British Army’s MBTs to the standard needed on today’s battlefield. Key elements include enhanced survivability, greater lethality, improved surveillance and target acquisition as well as removing obsolescence. The currently forecasted out of service date is 2040.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure and Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. 1. Global supply chain risks and key supplier issues that could impact delivery. 2. Resource shortfalls and challenges to recruit the required skill and experience levels in the Army Programme Management Office; DE and S and key suppliers. 3. Delivery of broader capabilities required to transition the Challenger 3 (CR3) platform into service; these currently have unresourced gaps which could impact delivery within the required timeline. 4. Ability to obtain approvals and contract at pace to deliver the remaining scope of the programme in an acceptable timeframe. This mainly pertains to the Active Protection System.","startDate":"2014-12-04","endDate":"2030-06-30","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained scheduled to finish on 2030-06-30. This is primarily due to the following factors. The programme remains on track to achieve its key milestones. These are. Initial Operating Capability (1 Squadron of tanks with crews trained to the appropriate standard and held at readiness) – November 2027. Full Operating Capability (148 tanks delivered and all Key User Requirements met subject to subsequent approvals). November 2030. The platform Critical Design Review was achieved in January 2023 providing confidence in the design and readiness for the next phases of delivery.","fyBaseline":217.46,"fyForecast":106.86,"fyVariance":-50.86,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The main causes of the underspend are: The alignment of the Rheinmetall BAE Land Systems (RBSL) contract to the latest pre-series vehicle delivery dates, placement of the EPSOM Design and Manufacture (D&M) contract, confirmation of Government Furnished Equipment (GFE), alignment to the German Government plans for the Enhanced Kinetic Solution, the Active Protection System (APS) de-risking activity being removed, and FOREX volatility.","wholeLifeCost":1986.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 increased from 1435m to 1987m. This is primarily due to the following factors. At Q4 22/23 the Baseline Whole Life cost was 1435m. Following completion of EPSOM (New Armour System) negotiations this decreased by 13m to 1422m. As at March 2024 the new WLC of 1985m includes the costings for the full EPSOM 148 Inert sets and Active Protection System D&M. The review note agreeing this uplift is still subject to approval by the Treasury.","benefits":0.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 0m.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure and Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. 1. Global supply chain risks and key supplier issues that could impact delivery. 2. Resource shortfalls and challenges to recruit the required skill and…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"MOD_0104_1617-Q1","year":2025,"name":"ARMOUR MBT 2025","department":"MoD","category":"Military Capability","description":"The Armour Main Battle Tank (MBT) Programme will deliver the Challenger 3 (CR3) capability. Challenger 3 will be Defence’s only guaranteed, 24 hour, all weather, mobile anti-tank capability. This programme will modernise and improve the British Army’s MBTs to the standard needed on today’s battlefield. Key elements include enhanced survivability, greater lethality, improved surveillance and target acquisition as well as removing obsolescence.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Project's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER, compared with the Infrastructure and Projects Authority's assessment last year of AMBER. This is due to the following factors. 1. Key supplier issues that could impact delivery. 2. The Delivery of the broader capabilities required to transition the CR3 platform into service currently has encountered funding gaps which could impact delivery within the required timeline. 3. Resource shortfalls and challenges to recruit the required skills and experience levels in the Army Programme Management Office, Delivery Equipment and Support teams (DE and S) and key suppliers presents another key challenge.","startDate":"2014-12-04","endDate":"2031-05-22","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 30/06/2030 to 22/05/2031. This is primarily due to the following factors: This a correction from the previously released information. The Investment Approval Committee agreed forecast end date remains unchanged as 22/05/2031.","fyBaseline":165.95,"fyForecast":178.13,"fyVariance":7.34,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. Reprofiling from future years; underlying cost movements; and, Foreign Exchange rate changes. The key increases relate to placement of contracts for EPSOM armour and the Active Protection System following approval of those elements in June 2024.","wholeLifeCost":1916.53,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 1986 to 1916. This is primarily due to the following factors. Necessary adjustments to reflect the timing and level of approved costs related to the procurement of Active Protection System and additional EPSOM armour.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits","themes":["Cost & funding","Delivery & schedule","Workforce & capability","Approvals & decisions"],"evidenceExcerpt":"The Project's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER, compared with the Infrastructure and Projects Authority's assessment last year of AMBER. This is due to the following factors. 1. Key supplier issues that could impact delivery. 2. The Delivery of the broader capabilities required to transition the CR3 platform into service currently…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"MOD_0104_1617-Q1","year":2026,"name":"ARMOUR MBT 2025","department":"MOD","category":"Military Capability","description":"The Armour Main Battle Tank (MBT) Programme will deliver the Challenger 3 capability. Challenger 3 will be Defence’s only guaranteed, 24 hr, all weather, mobile anti-tank capability. This programme will modernise and improve the British Army’s MBTs to the standard needed on today’s battlefield. Key elements include enhanced survivability, greater lethality, improved surveillance and target acquisition as well as removing obsolescence. The currently forecasted out of service date is 2040 but this is likely to be extended beyond this date to ensure value for money.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 decreased to Red. This is primarily due to the following factors. 1. Forecast delays and risk to Initial Operating Capability and Full Operating capability in delivery from the Prime Contractor. 2. Demonstration phase trials are still progressing to prove the performance of the tank but the time taken to do this is likely to impact on training and familiarisation","startDate":"2014-12-04","endDate":"2032-10-11","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 22/05/2031. This is primarily due to the following factors. 1. This forecast date remains subject to confirmation and could be subject to change if anticipated delays in equipment deliveries are encountered.","fyBaseline":204.59,"fyForecast":136.48,"fyVariance":33.29,"varianceNarrative":"The in-year variance exceeds 5%. This is primarily due to the following factors. 1. Reprofiling into future years, underlying cost movements, and, Foreign Exchange rate changes. 2. The key decreases relate to the anticipated delays in deliveries from the Prime Contractor. 3. Costings for 25/26 reflect the latest forecast and not the revised delivery schedule. These adjustments will be presented for approval in due course.","wholeLifeCost":1979.22,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) increased from £1916.53M to £1944.09M. This is primarily due to the following factors. 1. Adjustments to reflect the anticipated delays in deliveries from the Prime Contractor. A revised costing profile is expected in Q1 26/27.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. The project's departmentally agreed Benefits WLT is unchanged.","themes":["Cost & funding","Delivery & schedule","Workforce & capability","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 decreased to Red. This is primarily due to the following factors. 1. Forecast delays and risk to Initial Operating Capability and Full Operating capability in delivery from the Prime Contractor. 2. Demonstration phase trials are still progressing to…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"MOD_0104_1617-Q1","year":2025,"name":"ARMOUR MBT 2025","department":"MoD","category":"Military Capability","description":"The Armour Main Battle Tank (MBT) Programme will deliver the Challenger 3 (CR3) capability. Challenger 3 will be Defence’s only guaranteed, 24 hour, all weather, mobile anti-tank capability. This programme will modernise and improve the British Army’s MBTs to the standard needed on today’s battlefield. Key elements include enhanced survivability, greater lethality, improved surveillance and target acquisition as well as removing obsolescence.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Project's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER, compared with the Infrastructure and Projects Authority's assessment last year of AMBER. This is due to the following factors. 1. Key supplier issues that could impact delivery. 2. The Delivery of the broader capabilities required to transition the CR3 platform into service currently has encountered funding gaps which could impact delivery within the required timeline. 3. Resource shortfalls and challenges to recruit the required skills and experience levels in the Army Programme Management Office, Delivery Equipment and Support teams (DE and S) and key suppliers presents another key challenge.","startDate":"2014-12-04","endDate":"2031-05-22","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 30/06/2030 to 22/05/2031. This is primarily due to the following factors: This a correction from the previously released information. The Investment Approval Committee agreed forecast end date remains unchanged as 22/05/2031.","fyBaseline":165.95,"fyForecast":178.13,"fyVariance":7.34,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. Reprofiling from future years; underlying cost movements; and, Foreign Exchange rate changes. The key increases relate to placement of contracts for EPSOM armour and the Active Protection System following approval of those elements in June 2024.","wholeLifeCost":1916.53,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 1986 to 1916. This is primarily due to the following factors. Necessary adjustments to reflect the timing and level of approved costs related to the procurement of Active Protection System and additional EPSOM armour.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits","themes":["Cost & funding","Delivery & schedule","Workforce & capability","Approvals & decisions"],"evidenceExcerpt":"The Project's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER, compared with the Infrastructure and Projects Authority's assessment last year of AMBER. This is due to the following factors. 1. Key supplier issues that could impact delivery. 2. The Delivery of the broader capabilities required to transition the CR3 platform into service currently…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":1,"transition":"Worsened","endDateDeltaDays":508,"attentionScore":91,"attentionReasons":["Current published delivery confidence is Red","Published rating worsened from Amber to Red","Published end date moved 508 days later","In-year forecast variance is +33.3%"]},{"id":"MOD_0135_2122-Q1","year":2026,"name":"SUBMARINE DISMANTLING PROJECT","department":"MOD","category":"Military Capability","description":"The Submarine Dismantling Project covers the preparation and execution of the safe and secure dismantling of the first defueled, decommissioned, Royal Navy submarine, Swiftsure, in Rosyth, by the end of 2026.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25-Q4, the NISTA/SRO Delivery Confidence Assessment rating at 25/26-Q4 decreased to Red. This is primarily due to the following factors. 1. The project’s novel and complex nature, which continues to present unforeseen challenges. 2. While progress is being made, ongoing prime supplier performance issues and third-party supply chain risks pose potential delays. 3. Additionally, gaps have been identified in the project’s planning, controls, and commercial arrangements, which are impacting overall delivery assurance.","startDate":"2013-03-29","endDate":"2028-10-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 increased from 31/03/2027 to 31/10/2028. This is primarily due to the following factors; The date is based on a continually maturing schedule and its achievability. This date represents the formal closure of the project and is separate from the milestone to complete the dismantling of Swiftsure by 2026.","fyBaseline":68.04,"fyForecast":57.11,"fyVariance":16.06,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factor; schedule and materials cost reprofiling.","wholeLifeCost":541.73,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) increased from £400.382 to £489.563. This is primarily due to the maturation of infrastructure and other costs.","benefits":null,"benefitsNarrative":"Compared to financial year 2024/25-Q4, the project's departmental-agreed monetised benefits at 2025/26-Q4 remained at £0m.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25-Q4, the NISTA/SRO Delivery Confidence Assessment rating at 25/26-Q4 decreased to Red. This is primarily due to the following factors. 1. The project’s novel and complex nature, which continues to present unforeseen challenges. 2. While progress is being made, ongoing prime supplier performance issues and third-party supply…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"MOD_0135_2122-Q1","year":2022,"name":"Submarine Dismantling Project","department":"MOD","category":"Military Capability","description":"The Submarine Dismantling Project mandate covers preparation and execution to safely and securely dismantle the first defueled and decommissioned Royal Navy submarine in Rosyth by 2026.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Senior Responsible Owner's Delivery Confidence Assessment rating is Amber. This is primarily due to the following factors: Market conditions and general uncertainty with the novel task being undertaken means there is inherent risk to the delivery estimates.","startDate":"2013-03-29","endDate":"2026-12-31","scheduleNarrative":"The project end-date is 31 December 2026. This is primarily due to the following factors: The Programme entered the Government Major Projects Portfolio in Financial Year 2021/22, as such there is no baseline date recorded for March 21 for comparison.","fyBaseline":33.73,"fyForecast":33.73,"fyVariance":0.0,"varianceNarrative":"The budget variance is inferior or equal to 5%.","wholeLifeCost":278.0,"costNarrative":"The project's Baseline Whole Life Cost is 277.66 (£M). This is primarily due to the following factors: The cost remains uncertain until The Ministry of Defence has proven this \"first of its kind\" dismantling process on the demonstrator submarine, with a scheduled completion date in 2026. These costs are subject to annual review.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Governance & assurance"],"evidenceExcerpt":"The Senior Responsible Owner's Delivery Confidence Assessment rating is Amber. This is primarily due to the following factors: Market conditions and general uncertainty with the novel task being undertaken means there is inherent risk to the delivery estimates. The project end-date is 31 December 2026. This is primarily due to the following factors: The…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"MOD_0135_2122-Q1","year":2023,"name":"Submarine Dismantling Project","department":"MOD","category":"Military Capability","description":"The Submarine Dismantling Project mandate covers preparation and execution to safely and securely dismantle the first defueled and decommissioned Royal Navy submarine in Rosyth by 2026.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 21/22-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. The project is continuing to progress in line with its maturing schedule, however, this is a ground breaking programme and learning by doing encounters difficulty and challenge that cannot necessarily be planned for.","startDate":"2013-03-29","endDate":"2026-12-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2026-12-31. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 31/12/2026.The date is based on a maturing deterministic schedule and its achievability will become clearer over the next 12 months.","fyBaseline":33.39,"fyForecast":33.18,"fyVariance":-1.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":298.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 increased from 278m. to 298m. This is primarily due to the following factors. An increase in number of employees required to complete the work and the impact of inflation e.g. the rising cost of materials.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This programme does not report cashable benefits. Its aim is to provision the armed forces with the equipment and / or infrastructure required.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. The project is continuing to progress in line with its maturing schedule, however, this is a ground breaking programme and learning by doing encounters difficulty and…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"MOD_0135_2122-Q1","year":2024,"name":"Submarine Dismantling Project","department":"MOD","category":"Military Capability","description":"The Submarine Dismantling Project covers the preparation and execution of safely and securely dismantling the first defueled and decommissioned Royal Navy submarine, in Rosyth, by 2026.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The project is continuing to progress in line with its maturing schedule, however, this is a novel and complex project and learning by doing encounters difficulty and challenge that cannot necessarily be planned for.","startDate":"2013-03-29","endDate":"2027-03-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 is scheduled to finish on 2027-03-31. The date is based on a maturing schedule and its achievability. This date represents the formal closure of the project and is separate from the milestone to complete the dismantling of Swiftsure by 2026.","fyBaseline":48.49,"fyForecast":42.31,"fyVariance":-12.745,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. Labour and materials cost reprofiling.","wholeLifeCost":362.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 increased from 298m. to 362m. This is primarily due to the following factors. An increase in the number of employees required to complete the work and the impact of inflation e.g. the rising cost of materials.","benefits":0.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 0m.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The project is continuing to progress in line with its maturing schedule, however, this is a novel and complex project and learning by doing encounters difficulty and…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"MOD_0135_2122-Q1","year":2025,"name":"SUBMARINE DISMANTLING PROJECT","department":"MoD","category":"Military Capability","description":"The Submarine Dismantling Project covers the preparation and execution of the safe and secure dismantling of the first de-fueled and decommissioned Royal Navy submarine, Swiftsure, in Rosyth, by 2026.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. The project is continuing to progress in line with its maturing schedule. However, this is a novel and complex project which can encounter challenges that cannot necessarily be planned for.","startDate":"2013-03-29","endDate":"2027-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2027.","fyBaseline":64.47,"fyForecast":53.22,"fyVariance":17.46,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. This is due to schedule and materials cost re-profiling.","wholeLifeCost":400.38,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 362 to 400. This is primarily due to the following factors. The maturation of infrastructure costs.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. The project is continuing to progress in line with its maturing schedule. However, this is a novel and complex project which can encounter challenges that cannot necessarily be planned for. Compared to…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"MOD_0135_2122-Q1","year":2026,"name":"SUBMARINE DISMANTLING PROJECT","department":"MOD","category":"Military Capability","description":"The Submarine Dismantling Project covers the preparation and execution of the safe and secure dismantling of the first defueled, decommissioned, Royal Navy submarine, Swiftsure, in Rosyth, by the end of 2026.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25-Q4, the NISTA/SRO Delivery Confidence Assessment rating at 25/26-Q4 decreased to Red. This is primarily due to the following factors. 1. The project’s novel and complex nature, which continues to present unforeseen challenges. 2. While progress is being made, ongoing prime supplier performance issues and third-party supply chain risks pose potential delays. 3. Additionally, gaps have been identified in the project’s planning, controls, and commercial arrangements, which are impacting overall delivery assurance.","startDate":"2013-03-29","endDate":"2028-10-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 increased from 31/03/2027 to 31/10/2028. This is primarily due to the following factors; The date is based on a continually maturing schedule and its achievability. This date represents the formal closure of the project and is separate from the milestone to complete the dismantling of Swiftsure by 2026.","fyBaseline":68.04,"fyForecast":57.11,"fyVariance":16.06,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factor; schedule and materials cost reprofiling.","wholeLifeCost":541.73,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) increased from £400.382 to £489.563. This is primarily due to the maturation of infrastructure and other costs.","benefits":null,"benefitsNarrative":"Compared to financial year 2024/25-Q4, the project's departmental-agreed monetised benefits at 2025/26-Q4 remained at £0m.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25-Q4, the NISTA/SRO Delivery Confidence Assessment rating at 25/26-Q4 decreased to Red. This is primarily due to the following factors. 1. The project’s novel and complex nature, which continues to present unforeseen challenges. 2. While progress is being made, ongoing prime supplier performance issues and third-party supply…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"MOD_0135_2122-Q1","year":2025,"name":"SUBMARINE DISMANTLING PROJECT","department":"MoD","category":"Military Capability","description":"The Submarine Dismantling Project covers the preparation and execution of the safe and secure dismantling of the first de-fueled and decommissioned Royal Navy submarine, Swiftsure, in Rosyth, by 2026.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. The project is continuing to progress in line with its maturing schedule. However, this is a novel and complex project which can encounter challenges that cannot necessarily be planned for.","startDate":"2013-03-29","endDate":"2027-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2027.","fyBaseline":64.47,"fyForecast":53.22,"fyVariance":17.46,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. This is due to schedule and materials cost re-profiling.","wholeLifeCost":400.38,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 362 to 400. This is primarily due to the following factors. The maturation of infrastructure costs.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. The project is continuing to progress in line with its maturing schedule. However, this is a novel and complex project which can encounter challenges that cannot necessarily be planned for. Compared to…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":1,"transition":"Worsened","endDateDeltaDays":580,"attentionScore":85,"attentionReasons":["Current published delivery confidence is Red","Published rating worsened from Amber to Red","Published end date moved 580 days later","In-year forecast variance is +16.1%"]},{"id":"DFT_0033_1819-Q1","year":2026,"name":"EAST COAST MAINLINE PROGRAMME","department":"DFT","category":"Infrastructure and Construction","description":"A collection of track and power upgrade schemes between London King's Cross and Edinburgh to increase capacity and to enable the introduction of the Azuma fleet and a recast route timetable.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The route's recast timetable - required to deliver the benefits of the programme - was introduced successfully in December 2025. This was not able to accommodate all of the services envisaged in the programme's business case in 2018, and so work is now underway to re-baseline the benefits of the investment.","startDate":"2014-04-01","endDate":"2027-05-03","scheduleNarrative":"The infrastructure enhancements required to enable introduction of the recast timetable were completed successfully to schedule. Remaining works are for resilience purposes only, and scheduled for completion in May 2027.","fyBaseline":null,"fyForecast":21.68,"fyVariance":null,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":1276.49,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 increased from £1114m to £1122m. This is primarily due to increased costs associated with remaining power supply upgrade works on the route.","benefits":2028.11,"benefitsNarrative":"Following introduction of the route's recast timetable, work is now underway to reappraise the benefits of the programme, which will be recorded once this work is complete.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Scope & requirements"],"evidenceExcerpt":"The route's recast timetable - required to deliver the benefits of the programme - was introduced successfully in December 2025. This was not able to accommodate all of the services envisaged in the programme's business case in 2018, and so work is now underway to re-baseline the benefits of the investment. The infrastructure enhancements required to enable…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"DFT_0033_1819-Q1","year":2020,"name":"East Coast Mainline Programme","department":"DFT","category":"Infrastructure and Construction","description":"Improving capacity and frequency of the services on the East Coast Mainline, increasing passenger seat capacity to major stations along the route, reducing journey times and improving the customer experience through the introduction of new trains.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber, which has declined since last year�s Q2 1819 Amber/Green, due primarily to the following factors; - Realisation of the Programme's benefits is dependent upon the East Coast franchise's introduction of InterCity Express Programme trains and the delivery of those trains has been delayed. The final train deliveries are now expected in Summer 2020. - The IPA anticipated that the digital signalling project between London and Peterborough would be incorporated into the East Coast Mainline Programme in November 2019, increasing the complexity of the Programme. Since the Q2 1920 (30th September 2019) Amber IPA DCA, the following non-project operating environment activities have impacted the original Q2 IPA DCA; - COVID-19 will delay the delivery of engineering works and is likely to mean the planned introduction of the new East Coast Mainline timetable in December 2021 is deferred. The prolongation and replanning of these activities will increase costs and delay the realisation of the Programme's benefits. - The digital signalling project will not be incorporated into the East Coast Main Line Programme but will be delivered as a separate scheme later in the 2020s. Since the Q2 1920 (30th September 2019) Amber IPA DCA, the following primary project actions have impacted the original Q2 IPA DCA; - As a result of COVID-19, engineering works to remodel the track layout King's Cross Station have been delayed. The project needs to replan the works. There is a risk that the introduction of the new East Coast timetable will need to be deferred from December 2021. - The storms experienced in early 2020, combined with the impact of COVID-19, mean that critical works on the Werrington Grade Separation project have been delayed, putting the entry into service date of this enhancement at risk. The project team needs to replan the works.","startDate":"2014-04-01","endDate":"2023-12-01","scheduleNarrative":"The scheduled baseline project end date at Q2 1920 (30th September 2019) is 01/12/23, has not changed since last year's Q2 1819 date of 01/12/23, due primarily to the following factors; - At Q2 19/20, all of the projects that enable the new East Coast timetable to be introduced were forecast to be completed at least six months before the timetable change date. - A planning group has been established to develop the new East Coast timetable and at Q2 19/20 its work was proceeding to schedule. Since the Q2 1920 (30th September 2019) baseline project end date of 01/12/23, the following non-project operating environment activities have impacted the original Q2 baseline project end date; - Although COVID-19 will delay engineering works and is likely to delay the introduction of the new East Coast timetable, the Programme's end date is defined by the completion of power supply upgrades. These upgrades could still be completed in 2023, meaning the Programme's end date remains achievable. Since the Q2 1920 (30th September 2019) baseline project end date of 01/12/23, the following primary project actions have impacted the original Q2 baseline project end date; - The project needs to be replan the delivery of the engineering works delayed as a result of COVID-19 and confirm when the new East Coast Main Line timetable will be implemented. - The project is liaising with power distribution companies to confirm the timescales for completion of the new connections that are needed to the National Grid.","fyBaseline":208.8,"fyForecast":166.7,"fyVariance":-20.0,"varianceNarrative":"The 19/20 in-year baseline / forecast variance at Q2 1920 (30th September 2019) of -20%, is due primarily to the following factors; - Contracts for power supply upgrades were due to be awarded in August 2019 but this was delayed until 2020 because the tender prices received were higher than expected and further contract negotiations were needed. - The 19/20 in-year forecast underspend would have been greater than 20% but the Stevenage turnback project has been accelerated, bringing forward those costs from 20/21. Since the Q2 1920 (30th September 2019) 19/20 in-year baseline / forecast variance of -20%, the following non-project operating environment activities have impacted the original Q2 19/20 in-year baseline / forecast variance; - The variance has not been affected by non-project operating environment activities. Since the Q2 1920 (30th September 2019) 19/20 in-year baseline / forecast variance of -20%, the following primary project actions have impacted the original Q2 19/20 in-year variance; - Since Q2, project team revisions to forecast costs have reduced the Programme-level variance for the year to an underspend of 17%. - Funding was approved in December 2019 to enable power supply upgrade enabling works to start ahead of full contract award and reduce the in-year underspend.","wholeLifeCost":1040.4,"costNarrative":"The baseline Whole Life Cost at Q2 1920 (30th September 2019) is �1,040.40 m, has increased by �0.03 m since last year's Q2 1819 (�m) baseline Whole Life Cost of �1,040.37 m, due primarily to the following factors; - The baseline Whole Life Cost for the Programme has not changed but the figure reported at Q2 1920 was rounded to the nearest �100k. - The cost of the power supply upgrades between Doncaster and York has not been finalised due to ongoing contract negotiations with suppliers. When these costs have been confirmed, the baseline Whole Life Cost for the Programme will be updated. Since the Q2 1920 (30th September 2019) �1,040.40 m baseline Whole Life Cost, the following non-project operating environment activities have impacted the original baseline Q2 Whole Life Cost; - COVID-19 will delay the delivery of projects and introduction of new timetable. The prolongation and replanning of works is expected to increase costs and mean the benefits of the Programme are introduced later than planned. The Programme will need to be re-baselined when the implications of the virus have been fully assessed. Since the Q2 1920 (30th September 2019) �1,040.40 m baseline Whole Life Cost, the following primary project actions have impacted the original Q2 baseline Whole Life Cost; - Network Rail needs to quantify the cost implications of the COVID-19 delays on each project. - The total cost of the East Coast Main Line power supply upgrades is being finalised with the supply chain.","benefits":null,"benefitsNarrative":"","themes":["Delivery & schedule","Cost & funding","Technical & integration","Commercial & supply chain"],"evidenceExcerpt":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber, which has declined since last year�s Q2 1819 Amber/Green, due primarily to the following factors; - Realisation of the Programme's benefits is dependent upon the East Coast franchise's introduction of InterCity Express Programme trains and the delivery of those…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2020","sourceLabel":"IPA Annual Report 2019-20"},{"id":"DFT_0033_1819-Q1","year":2021,"name":"East Coast Mainline Programme","department":"DFT","category":"Infrastructure and Construction","description":"The East Coast Main Line Enhancement Programme is a collection of track and power upgrade schemes between London King's Cross and Edinburgh to increase capacity and to enable the introduction of the Intercity Express trains through the East Coast franchise.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber. This is primarily due to the following factors: Although good progress has been made with the delivery of the infrastructure upgrades, the project's Amber rating reflects the challenging schedule for developing the new East Coast Main Line timetable for introduction in May 2022. The Department is working with Network Rail and operating companies to agree pragmatic solutions and trade-offs to deliver the best outcomes for passengers and freight customers.","startDate":"2014-04-01","endDate":"2024-12-01","scheduleNarrative":"Compared to financial year 19/20-Q2, the project's end-date increased from 01 December 2023 to 01 December 2024 . This is primarily due to the following factors: The major milestone of timetable upgrade to reflect new paths/capacity was delayed from December 2021 due to the COVID lockdown leading to delays in infrastructure work. In addition, power supply upgrades north of Newcastle are not forecast to be completed until 2024 because the tender prices received for the works were higher than expected and further negotiations were needed, delaying the award of the contract. Operational mitigations will enable the new timetable to be introduced, improving passenger services, before the power upgrades are completed.","fyBaseline":224.9,"fyForecast":197.7,"fyVariance":-12.0,"varianceNarrative":"The budget variance exceeds 5%. The delay in awarding the contract for power supply upgrades resulted in costs moving out of 2020/21 into subsequent years.","wholeLifeCost":1040.4,"costNarrative":"Compared to financial year 19/20-Q2, the projects Baseline Whole Life Cost remained at �1040.40m. This is primarily due to the following factors: The baseline whole life cost for the project has not changed.","benefits":null,"benefitsNarrative":"","themes":["Delivery & schedule","Cost & funding","Commercial & supply chain","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber. This is primarily due to the following factors: Although good progress has been made with the delivery of the infrastructure upgrades, the project's Amber rating reflects the challenging schedule for developing the new East…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21"},{"id":"DFT_0033_1819-Q1","year":2022,"name":"East Coast Mainline Programme","department":"DFT","category":"Infrastructure and Construction","description":"The East Coast Main Line Enhancement Programme is a collection of track and power upgrade schemes between London King's Cross and Edinburgh to increase capacity and reduce journey times. The Programme has enabled the East Coast franchise to introduce a new fleet of Intercity Express trains.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 20/21-Q4, the Delivery Confidence Assessment rating at 21/22-Q4 remained at Amber. Although the majority of the necessary infrastructure upgrades have now been completed, the Programme's Amber rating reflects the challenging schedule for finalising the new East Coast Main Line timetable, led by the Department's Passenger Services team, and securing the necessary approvals ahead of the planned introduction in May 2023. The decision to defer the introduction of the new timetable from May 2022 was taken, in part, to give the Department, Network Rail and the train operating companies time to address the feedback received from the public consultation on the proposed changes that was carried out in 2021.","startDate":"2014-04-01","endDate":"2024-12-01","scheduleNarrative":"Compared to 2021-Q4, your project end-date remained scheduled to finish on 01 DEC 2024 . This is primarily due to the following factors: The power supply upgrades remain forecast to be completed in 2024 but, with power draw mitigations in place, the rail industry is planning to introduce a new East Coast Main Line timetable in May 2023 to increase the number of passenger services and reduce journey times. There are a number of risks to the achievement of this milestone, including completing the development of the timetable and delivering two essential, but small-scale, infrastructure upgrades before the change.","fyBaseline":137.5,"fyForecast":104.14,"fyVariance":-25.0,"varianceNarrative":"The Programme underspent its 2021/22 budget by 24% primarily because of delays to the power supply upgrades and a proportion of those costs moving into later years. The delays were principally due to the redesign work needed to satisfy a change in interface requirements from the electricity Distribution Network Operators and archaeological discoveries at a worksite near Marshall Meadows.","wholeLifeCost":1040.0,"costNarrative":"Compared to 2021-Q4,the projects Baseline Whole Life Cost remained at 1040.40 (£m). This is primarily due to the following factors: The baseline whole life cost for the project has not changed and forecast costs remain within the funding range agreed with HM Treasury for the delivery of the Programme.","benefits":null,"benefitsNarrative":"","themes":["Delivery & schedule","Cost & funding","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Delivery Confidence Assessment rating at 21/22-Q4 remained at Amber. Although the majority of the necessary infrastructure upgrades have now been completed, the Programme's Amber rating reflects the challenging schedule for finalising the new East Coast Main Line timetable, led by the Department's Passenger Services…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"DFT_0033_1819-Q1","year":2023,"name":"East Coast Mainline Programme","department":"DFT","category":"Infrastructure and Construction","description":"The East Coast Main Line Enhancement Programme is a collection of track and power upgrade schemes between London King's Cross and Edinburgh to increase capacity and reduce journey times. The Programme has enabled the East Coast franchise to introduce a new fleet of Intercity Express trains.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 21/22-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. Although the majority of the necessary infrastructure upgrades have now been completed, the Programme's Amber rating reflects the challenging schedule for finalising the content of the new East Coast Main Line timetable, led by the Department's Passenger Services team, and securing the necessary approvals ahead of its introduction, which will not be before June 2024 .","startDate":"2014-04-01","endDate":"2024-12-01","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2024-12-01. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2024-12-01. This is primarily due to the following factors. The power supply upgrades remain forecast to be completed by December 2024 but, with mitigations in place, the rail industry could introduce a new East Coast Main Line timetable from June 2024 to increase the number of passenger services and reduce journey times. The introduction of the new timetable is dependent upon agreement of the train service specification and funding for the operation of those services.","fyBaseline":15.1,"fyForecast":79.49,"fyVariance":426.0,"varianceNarrative":"Programme costs in 2022/23 were significantly higher than the baseline because delays to the power supply upgrades led to costs moving from earlier years; total costs have not changed. The delays were principally due to the redesign work needed to satisfy a change in interface requirements from the electricity Distribution Network Operators and archaeological discoveries at a worksite near Berwick.","wholeLifeCost":1040.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 remained at 1040m. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 remained at 1040m. This is primarily due to the following factors. The baseline whole life cost for the project has not changed and forecast costs remain within the funding range agreed with HM Treasury for the delivery of the Programme.","benefits":2953.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 2953m. The benefits baseline assumed that the new East Coast Main Line timetable would be introduced in May 2021 but, due to the impact of the pandemic on the rail industry's finances, its implementation has been deferred until June 2024 at the earliest. When the content of the new timetable and its date of introduction have been agreed, the passenger benefits achieved by the Programme will need to be reappraised.","themes":["Cost & funding","Delivery & schedule","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. Although the majority of the necessary infrastructure upgrades have now been completed, the Programme's Amber rating reflects the challenging schedule for finalising the…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"DFT_0033_1819-Q1","year":2024,"name":"East Coast Mainline Programme","department":"DFT","category":"Infrastructure and Construction","description":"The East Coast Main Line Enhancements Programme is a collection of track and power upgrade schemes between London King's Cross and Edinburgh to increase capacity and reduce journey times. The Programme has enabled the East Coast franchise to introduce a new fleet of Intercity Express trains.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. Although all of the infrastructure upgrades required to operate the new East Coast Main Line timetable have now been delivered, the Programme's Amber rating reflects the challenging schedule for agreeing and finalising the timetable specification. This activity is being led by the Department's Passenger Services team, and, as of 31/03/24, implementation will not be before December 2024.","startDate":"2014-04-01","endDate":"2025-06-02","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 increased from 2024-12-01 to 2025-06-02. This is primarily due to the following factors. Whilst the power supply upgrades required to operate the new timetable have now been delivered, the remaining interventions (required for route resilience purposes) are now forecast for completion in June 2025.","fyBaseline":0.0,"fyForecast":68.94,"fyVariance":null,"varianceNarrative":"Programme costs in 2023/24 were significantly higher than the baseline because delays to the power supply upgrades led to costs moving from earlier years; total Programme costs remain within the approved budget.","wholeLifeCost":1040.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 remained at 1040m. This is primarily due to the following factors. The baseline whole life cost for the project has not changed and forecast costs remain within the funding range agreed with HM Treasury for the delivery of the Programme.","benefits":2953.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 2953m. The benefits baseline assumed that the new East Coast Main Line timetable would be introduced in May 2021 but, due to the impact of the pandemic on the rail industry's finances, its implementation has been deferred until December 2024 at the earliest. When the content of the new timetable and its date of introduction have been agreed, the passenger benefits achieved by the Programme will be reforecast.","themes":["Cost & funding","Delivery & schedule","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. Although all of the infrastructure upgrades required to operate the new East Coast Main Line timetable have now been delivered, the Programme's Amber rating reflects the…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"DFT_0033_1819-Q1","year":2025,"name":"EAST COAST MAINLINE PROGRAMME","department":"DfT","category":"Infrastructure and Construction","description":"A programme of infrastructure works, the East Coast Main Line Enhancements Programme aims to realise the benefits of LNER's deployment of their new Azuma rolling stock. The intended outcomes of this Programme are: • Long Distance High Speed (LDHS) seating capacity into London increased by 38% from approximately 2019s 2900 to 3950 seats per hour at peak times; • Train service frequency increased from 6 to 8 LDHS between London King's Cross and Doncaster and from 5 to 6 passenger services between Doncaster and Newcastle per hour; • Maintain freight capacity for current and Freight Market Study forecast demand, using diversionary routes as far as practicable; and • A reduction in journey times for the fastest LDHS services in each hour to 4 hours between London and Edinburgh and 2 hours between London and Leeds.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The infrastructure upgrades required to introduce the route's recast timetable have now been delivered, but implementation of that timetable - originally proposed for 2021 - has been delayed on a number of occasions. It is now planned for introduction in December 2025, although a number of irresolvable conflicts across the route mean it will not be possible to realise the full benefits originally forecast.","startDate":"2014-04-01","endDate":"2026-06-02","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 02/06/2025 to 02/06/2026. This is primarily due to the following factors‚ Whilst the power supply upgrades required to enable introduction of the route's recast timetable are now complete, delivery of remaining power interventions - required for route resilience purposes only - have been pushed back due to commissioning delays caused by National Grid resourcing constraints. Close engagement is continuing between Network Rail and National Grid to learn lessons from these challenges, with ECML, Midland Main Line, and other national electrification projects contributing. Work also continues to explore ways in which the new forecast completion date can be brought forward.","fyBaseline":25.65,"fyForecast":24.0,"fyVariance":6.43,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The aforementioned delays to commissioning of the remaining power supply upgrades has meant that some of the spend associated with those works has been moved from FY24/25 into FY25/26. This movement has been agreed through the Department's Portolio management.","wholeLifeCost":1040.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 1040. This is primarily due to the following factors‚ The Programme has an approved budget of up to £1,230m, which includes Network Rail's contingency and DfT's assessment of optimism bias totalling £305m. A number of risks have materialised, costs have increased due to Covid-19, and minor additional scope added to the Programme, so the forecast spend is now £74m more than the baseline cost of £1,040m. The Department and Network Rail are working to ensure that remaining upgrades are delivered as cost effectively as possible.","benefits":2953.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 2953. This is primarily due to the following factors‚ Programme benefits are dependent upon introduction of a recast route timetable. The benefits baseline assumed that this would be introduced in May 2021, but, due to the impact of the pandemic on the rail industry's finances, its implementation has been deferred. We are now planning for its introduction in December 2025, and when its final contents have been formally agreed the full benefits of the Programme will be reforecast. A high-level analysis has estimated that 26% of the planned passenger benefits have already been realised through incremental improvements to the existing timetable. The remaining benefits will be delivered when the new timetable is implemented, and we estimate that the Programme's BCR will remain above 2 (high value for money).","themes":["Cost & funding","Delivery & schedule","Scope & requirements","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The infrastructure upgrades required to introduce the route's recast timetable have now been delivered, but implementation of that timetable - originally proposed for…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"DFT_0033_1819-Q1","year":2026,"name":"EAST COAST MAINLINE PROGRAMME","department":"DFT","category":"Infrastructure and Construction","description":"A collection of track and power upgrade schemes between London King's Cross and Edinburgh to increase capacity and to enable the introduction of the Azuma fleet and a recast route timetable.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The route's recast timetable - required to deliver the benefits of the programme - was introduced successfully in December 2025. This was not able to accommodate all of the services envisaged in the programme's business case in 2018, and so work is now underway to re-baseline the benefits of the investment.","startDate":"2014-04-01","endDate":"2027-05-03","scheduleNarrative":"The infrastructure enhancements required to enable introduction of the recast timetable were completed successfully to schedule. Remaining works are for resilience purposes only, and scheduled for completion in May 2027.","fyBaseline":null,"fyForecast":21.68,"fyVariance":null,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":1276.49,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 increased from £1114m to £1122m. This is primarily due to increased costs associated with remaining power supply upgrade works on the route.","benefits":2028.11,"benefitsNarrative":"Following introduction of the route's recast timetable, work is now underway to reappraise the benefits of the programme, which will be recorded once this work is complete.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Scope & requirements"],"evidenceExcerpt":"The route's recast timetable - required to deliver the benefits of the programme - was introduced successfully in December 2025. This was not able to accommodate all of the services envisaged in the programme's business case in 2018, and so work is now underway to re-baseline the benefits of the investment. The infrastructure enhancements required to enable…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"DFT_0033_1819-Q1","year":2025,"name":"EAST COAST MAINLINE PROGRAMME","department":"DfT","category":"Infrastructure and Construction","description":"A programme of infrastructure works, the East Coast Main Line Enhancements Programme aims to realise the benefits of LNER's deployment of their new Azuma rolling stock. The intended outcomes of this Programme are: • Long Distance High Speed (LDHS) seating capacity into London increased by 38% from approximately 2019s 2900 to 3950 seats per hour at peak times; • Train service frequency increased from 6 to 8 LDHS between London King's Cross and Doncaster and from 5 to 6 passenger services between Doncaster and Newcastle per hour; • Maintain freight capacity for current and Freight Market Study forecast demand, using diversionary routes as far as practicable; and • A reduction in journey times for the fastest LDHS services in each hour to 4 hours between London and Edinburgh and 2 hours between London and Leeds.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The infrastructure upgrades required to introduce the route's recast timetable have now been delivered, but implementation of that timetable - originally proposed for 2021 - has been delayed on a number of occasions. It is now planned for introduction in December 2025, although a number of irresolvable conflicts across the route mean it will not be possible to realise the full benefits originally forecast.","startDate":"2014-04-01","endDate":"2026-06-02","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 02/06/2025 to 02/06/2026. This is primarily due to the following factors‚ Whilst the power supply upgrades required to enable introduction of the route's recast timetable are now complete, delivery of remaining power interventions - required for route resilience purposes only - have been pushed back due to commissioning delays caused by National Grid resourcing constraints. Close engagement is continuing between Network Rail and National Grid to learn lessons from these challenges, with ECML, Midland Main Line, and other national electrification projects contributing. Work also continues to explore ways in which the new forecast completion date can be brought forward.","fyBaseline":25.65,"fyForecast":24.0,"fyVariance":6.43,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The aforementioned delays to commissioning of the remaining power supply upgrades has meant that some of the spend associated with those works has been moved from FY24/25 into FY25/26. This movement has been agreed through the Department's Portolio management.","wholeLifeCost":1040.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 1040. This is primarily due to the following factors‚ The Programme has an approved budget of up to £1,230m, which includes Network Rail's contingency and DfT's assessment of optimism bias totalling £305m. A number of risks have materialised, costs have increased due to Covid-19, and minor additional scope added to the Programme, so the forecast spend is now £74m more than the baseline cost of £1,040m. The Department and Network Rail are working to ensure that remaining upgrades are delivered as cost effectively as possible.","benefits":2953.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 2953. This is primarily due to the following factors‚ Programme benefits are dependent upon introduction of a recast route timetable. The benefits baseline assumed that this would be introduced in May 2021, but, due to the impact of the pandemic on the rail industry's finances, its implementation has been deferred. We are now planning for its introduction in December 2025, and when its final contents have been formally agreed the full benefits of the Programme will be reforecast. A high-level analysis has estimated that 26% of the planned passenger benefits have already been realised through incremental improvements to the existing timetable. The remaining benefits will be delivered when the new timetable is implemented, and we estimate that the Programme's BCR will remain above 2 (high value for money).","themes":["Cost & funding","Delivery & schedule","Scope & requirements","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The infrastructure upgrades required to introduce the route's recast timetable have now been delivered, but implementation of that timetable - originally proposed for…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":1,"transition":"Worsened","endDateDeltaDays":335,"attentionScore":79,"attentionReasons":["Current published delivery confidence is Red","Published rating worsened from Amber to Red","Published end date moved 335 days later"]},{"id":"HO_0149_2223-Q2","year":2026,"name":"ASYLUM ACCOMMODATION PROGRAMME (AAP)","department":"HO","category":"Government Transformation and Service Delivery","description":"Asylum Accommodation Programme (AAP) increases the availability of safe and compliant asylum accommodation to meet statutory demand and reduce reliance on contingency hotel use. It will support a managed transition away from hotels, in line with the Government’s wider policy commitments.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared with Q4 2024/25, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at Q4 2025/26 remains Amber. This reflects broadly stable progress against the delivery plan, alongside ongoing dependencies and approvals. Progress remains in line with plans, with the surveys required to inform site planning and delivery now commissioned. As the programme progresses, timely approval across multiple sites will be a key factor in maintaining delivery momentum and achieving planned outcomes.","startDate":"2022-01-28","endDate":null,"scheduleNarrative":"Exempt under Section 22 - Information intended for future publication","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Exempt under Section 43 - Commercial interests","themes":["Delivery & schedule","Commercial & supply chain","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared with Q4 2024/25, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at Q4 2025/26 remains Amber. This reflects broadly stable progress against the delivery plan, alongside ongoing dependencies and approvals. Progress remains in line with plans, with the surveys required to inform site planning and delivery now commissioned. As the programme…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"HO_0149_2223-Q2","year":2024,"name":"ASRA Accommodation Programme (Non Detained) (AAPND)","department":"HO","category":"Government Transformation and Service Delivery","description":"The ASRA Accommodation Programme (Non Detained) was initially set up as one of a range of responses within the Migration and Borders command in the Home Office to tackle a growing demand for asylum accommodation and to reduce reliance on costly contingency options such as hotels - which is a Prime Ministerial priority as highlighted in point 5 of the Ten Point Plan to tackle illegal migration. _x000D_ Following a Programme re-set, a change to the name and scope of programme has recently been approved; it will now be referred to as the ASRA Accommodation Programme (Non-detained). The programme aims to find and set up fit-for-purpose accommodation for non-detained Asylum Seekers (covering single adult males, single adult females and family cohorts) establishing a flexible accommodation landscape of both short-term and long-term facilities.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. The programme has undertaken a period of review and reset since the last assurance review in September 2023. There have been changes in the wider operating environment, including changes to the Home Office (HO) ministerial team. The programme has put in place strengthened leadership arrangements and the Review Team (RT) heard consistently that the programme environment feels more stable, with firmer foundations in place, a realistic ambition and more deliverable plans, and therefore has been rated as Amber.","startDate":"2022-01-28","endDate":"2027-03-31","scheduleNarrative":"The project's end-date at 23/24-Q4 is 2027-03-31. This is primarily due to the following factors. The programme has gone through a complete rescoping exercise-including changing name from LSAP to ASRA Accommodation Programme (ND). _x000D_ In addition we have new set of high level deliverables, setting new target dates until March 2027. The programme is currently on target and positively working through bottom up plans (with added contingencies).","fyBaseline":295.17,"fyForecast":208.18,"fyVariance":-29.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. Less than 5%","wholeLifeCost":4219.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 23/24-Q4 is 4219m. This is primarily due to the following factors. The whole life cost (WLC) of the Programme is currently estimated at 2.49bn over an appraisal period of 10 _x000D_ years. This is a decrease of 1.70bn compared to the WLC of 4.19bn estimated in the _x000D_ Programme Business Case published in September 2023, reflected by the reduction in bedspaces _x000D_ to be delivered (from 10,000 to 6,500) and revised timescales for delivery. The programme spend to the end of 2023/24 is 222.54m._x000D_ Further spend of 266.33m is forecast for 2024/25 to complete delivery of and operate the _x000D_ four existing sites, and to progress pipeline sites into delivery to meet the March 2025 target._x000D_ (This excludes contingency of 24.7m and OB of 31.3m.)._x000D_ Budget of 170.15m has already been allocated for the four sites in delivery.","benefits":0.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 0m.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Approvals & decisions"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. The programme has undertaken a period of review and reset since the last assurance review in September 2023. There have been changes in the wider operating environment, including changes to the Home Office (HO)…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"HO_0149_2223-Q2","year":2025,"name":"ACCOMMODATION PROGRAMME (NON DETAINED) (APND)","department":"HO","category":"Government Transformation and Service Delivery","description":"The Asylum Accommodation Programme was initially set up as one of a range of responses in the Home Office to tackle a growing demand of asylum accommodation to reduce reliance on costly contingency options such as hotels. To date the Programme has delivered two sites (Wethersfield and the Bibby Stockholm) and continues to progress a pipeline of additional sites, outlined below. As lessons have been learned, the Programme has undertaken a strategic refresh and is aiming to deliver a more flexible estate, working closely with local authorities and statutory partners and in collaboration with other government departments. Smaller to medium sites are now being progressed and engagement is being prioritised at an earlier stage. As sites are progressed, a Stage Gate process is followed, ensuring that the correct steps and decision-making is carried out. The Programme is currently working towards a target of 5 thousand bed spaces by the end of 2026, agreed with InvestCo. This includes the delivery of pipeline sites and accommodation pilots.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The Programme has been rescaled from large sites to medium-sized sites with a focus on Pilot sites, which will contribute to the programme's 5 thousand target. The Programme remains committed to delivering against these targets and will be launching three pilot projects in close collaboration with local authorities and other key partners, testing different operating models for each of the sites through a more locally led delivery model. Due to these initiatives—and the Programmes continued efforts to reduce expenditure below last year’s levels, the programme maintains the Amber rating, which was confirmed during the recent NISTA review which also saw the programme awarded an Amber rating.","startDate":"2022-01-28","endDate":"2027-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2027. This is primarily due to the following factors‚ Pilots (there are 3 pilots in scope). Lower Target of 5000 bed spaces compared to 6500 bed spaces previous year (new target approved by Investco 16/01/25).","fyBaseline":322.33,"fyForecast":82.57,"fyVariance":74.38,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ 5% budget variance because the programmes expenditure was less than planned due to various reasons including slower than expected timelines to get sites live, planning approvals and site acquisitions.","wholeLifeCost":2492.43,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 4219 to 2492. This is primarily due to the following factors‚ 5% budget variance because the programme expenditure was less than planned due to various reasons including slower than expected timelines to get sites live, planning approvals and site acquisitions. Fewer sites than anticipated went live compared to previous business case due to slippage in timelines.","benefits":3187.7,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 0 to 3187. This is primarily due to the following factors‚ The Programme Business Case (PBC) was approved in 24/25 (for the first time) and the financial benefits modelling become available for reporting at this point. Prior to this and in the absence of approved financial modelling of benefits the Programme reported 0 which was advised at the time by the IPA (now NISTA) to the Delivery Lead for the Programme. The Programme was added to GMPP for the purpose of securing NISTA Assurance reviews funding and as such, the Programme had to commence GMPP reporting without an approved PBC or approved financial benefit modelling in place. The reported forecast of £3187.7m was for the whole life of the Programme up to and including 33/34 as outlined in the 2024 PBC.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The Programme has been rescaled from large sites to medium-sized sites with a focus on Pilot sites, which will contribute to the programme's 5 thousand target. The…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"HO_0149_2223-Q2","year":2026,"name":"ASYLUM ACCOMMODATION PROGRAMME (AAP)","department":"HO","category":"Government Transformation and Service Delivery","description":"Asylum Accommodation Programme (AAP) increases the availability of safe and compliant asylum accommodation to meet statutory demand and reduce reliance on contingency hotel use. It will support a managed transition away from hotels, in line with the Government’s wider policy commitments.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared with Q4 2024/25, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at Q4 2025/26 remains Amber. This reflects broadly stable progress against the delivery plan, alongside ongoing dependencies and approvals. Progress remains in line with plans, with the surveys required to inform site planning and delivery now commissioned. As the programme progresses, timely approval across multiple sites will be a key factor in maintaining delivery momentum and achieving planned outcomes.","startDate":"2022-01-28","endDate":null,"scheduleNarrative":"Exempt under Section 22 - Information intended for future publication","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Exempt under Section 43 - Commercial interests","themes":["Delivery & schedule","Commercial & supply chain","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared with Q4 2024/25, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at Q4 2025/26 remains Amber. This reflects broadly stable progress against the delivery plan, alongside ongoing dependencies and approvals. Progress remains in line with plans, with the surveys required to inform site planning and delivery now commissioned. As the programme…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"HO_0149_2223-Q2","year":2025,"name":"ACCOMMODATION PROGRAMME (NON DETAINED) (APND)","department":"HO","category":"Government Transformation and Service Delivery","description":"The Asylum Accommodation Programme was initially set up as one of a range of responses in the Home Office to tackle a growing demand of asylum accommodation to reduce reliance on costly contingency options such as hotels. To date the Programme has delivered two sites (Wethersfield and the Bibby Stockholm) and continues to progress a pipeline of additional sites, outlined below. As lessons have been learned, the Programme has undertaken a strategic refresh and is aiming to deliver a more flexible estate, working closely with local authorities and statutory partners and in collaboration with other government departments. Smaller to medium sites are now being progressed and engagement is being prioritised at an earlier stage. As sites are progressed, a Stage Gate process is followed, ensuring that the correct steps and decision-making is carried out. The Programme is currently working towards a target of 5 thousand bed spaces by the end of 2026, agreed with InvestCo. This includes the delivery of pipeline sites and accommodation pilots.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The Programme has been rescaled from large sites to medium-sized sites with a focus on Pilot sites, which will contribute to the programme's 5 thousand target. The Programme remains committed to delivering against these targets and will be launching three pilot projects in close collaboration with local authorities and other key partners, testing different operating models for each of the sites through a more locally led delivery model. Due to these initiatives—and the Programmes continued efforts to reduce expenditure below last year’s levels, the programme maintains the Amber rating, which was confirmed during the recent NISTA review which also saw the programme awarded an Amber rating.","startDate":"2022-01-28","endDate":"2027-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2027. This is primarily due to the following factors‚ Pilots (there are 3 pilots in scope). Lower Target of 5000 bed spaces compared to 6500 bed spaces previous year (new target approved by Investco 16/01/25).","fyBaseline":322.33,"fyForecast":82.57,"fyVariance":74.38,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ 5% budget variance because the programmes expenditure was less than planned due to various reasons including slower than expected timelines to get sites live, planning approvals and site acquisitions.","wholeLifeCost":2492.43,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 4219 to 2492. This is primarily due to the following factors‚ 5% budget variance because the programme expenditure was less than planned due to various reasons including slower than expected timelines to get sites live, planning approvals and site acquisitions. Fewer sites than anticipated went live compared to previous business case due to slippage in timelines.","benefits":3187.7,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 0 to 3187. This is primarily due to the following factors‚ The Programme Business Case (PBC) was approved in 24/25 (for the first time) and the financial benefits modelling become available for reporting at this point. Prior to this and in the absence of approved financial modelling of benefits the Programme reported 0 which was advised at the time by the IPA (now NISTA) to the Delivery Lead for the Programme. The Programme was added to GMPP for the purpose of securing NISTA Assurance reviews funding and as such, the Programme had to commence GMPP reporting without an approved PBC or approved financial benefit modelling in place. The reported forecast of £3187.7m was for the whole life of the Programme up to and including 33/34 as outlined in the 2024 PBC.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The Programme has been rescaled from large sites to medium-sized sites with a focus on Pilot sites, which will contribute to the programme's 5 thousand target. The…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":1,"transition":"Worsened","endDateDeltaDays":null,"attentionScore":74,"attentionReasons":["Current published delivery confidence is Red","Published rating worsened from Amber to Red","In-year forecast variance is +43.0%"]},{"id":"HO_0286_2324-Q2","year":2026,"name":"Asylum Support Accommodation Programme","department":"HO","category":"Government Transformation and Service Delivery","description":"The Asylum Support Accommodation Programme (ASAP) is focused on establishing new delivery and commercial arrangements for asylum accommodation and support services, with the aim of creating a more sustainable, scalable and effective system. The programme will deliver a suite of new and transformed contracts as part of a wider operating model, supported by enhanced management capability to improve oversight and system performance. ASAP will also replace a number of existing contracts, including the Asylum Accommodation and Support Contracts (AASC), Advice, Issue Reporting and Eligibility (AIRE), and Asylum Support Payments (ASP). This transition reflects the need to address affordability pressures, strengthen contract management, and reduce risks associated with the current delivery model.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) at 2025/26 Q4 increased to Red. This reflects the findings of a recent Programme Assurance Review (PAR), which highlighted significant delivery complexity and sustained pressure across key enabling functions. A revised Business Transformation Delivery Model has been endorsed, representing a change in project definition and requiring a period of re‑planning and re‑baselining across the programme. The programme continues to work towards submission of the OBC1 (FACT) which the PAR team will return to assess, and subject to a successful review, the programme will return to an Amber status for the OBC to be reviewed at InvestCo. In January 26, the Bridging Accommodation & Services Project (BASP) was closed as its original aims were no longer achievable. Activity is underway to establish the Collective Accommodation Management Service (CAMS) project within the scope of ASAP.","startDate":null,"endDate":"2029-12-21","scheduleNarrative":"The programme end date remains 14 June 2030 and is unchanged, reflecting current delivery and transition assumptions. Project closure is scheduled for 21 December 2029, following delivery of the Hybrid – Cluster 4 milestone and the ASAP – Hybrid Mobilisation milestone. This is followed by an estimated transition period of approximately 5.5 months to business‑as‑usual operations, resulting in a programme closure date of June 2030. The ASAP Programme Plan has been approved and baselined, with further work undertaken to strengthen planning quality across all levels of the programme. Detailed resource requirements are being developed to provide a comprehensive view of demand across the programme. Change control processes have been refined and aligned with established governance arrangements under the Senior Responsible Owner, ensuring that the impacts of any changes to the delivery model are fully understood and managed. Work is also ongoing to ensure that the programme plan reflects the integration of key enabling functions required to support effective management control, underpinned by a comprehensive reporting framework.","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"The projects departmentally agreed Benefits at 25/26 Q4 (measured in £m) is 0. The programme has not yet agreed benefits profiles, these are still being developed and will be agreed at Outline Business Case stage.","themes":["Delivery & schedule","Governance & assurance","Commercial & supply chain","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) at 2025/26 Q4 increased to Red. This reflects the findings of a recent Programme Assurance Review (PAR), which highlighted significant delivery complexity and sustained pressure across key enabling functions. A revised Business Transformation Delivery Model has been…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"HO_0286_2324-Q2","year":2025,"name":"Asylum Support Accommodation Programme","department":"HO","category":"Government Transformation and Service Delivery","description":"The Asylum Support Accommodation Programme (ASAP) aims to establish new delivery and commercial arrangements with two objectives in mind: 1-ASAP will deliver a suite of new and transformed asylum accommodation and support services contracts as part of a wider new model of provision which is both sustainable and scalable, supported by enhanced management capabilities to operate the system more effectively. 2-To replace existing contracts (specifically Asylum Accommodation and Support Contracts (AASC), Advice, Issue Reporting and Eligibility (AIRE) and Asylum Support Payments (ASP). The accommodation being delivered through the existing AASC contracts is very expensive, the management control provided within the contracts is limited, and there is elevated risk of market failure through the current suppliers.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER. This is due to‚ Programme had a new SRO from February 2025. Although the initial resource constraints have been reduced the programme continues to require further resources as the programme grows including support for key enabler activities. Delivery Model Assessment (DMA) work is ongoing with the final report due for approval at the Programme Board on 03/06/2025. A planning workshop was held with enabling teams to reduce the forecasted Outline Business Case (OBC) delivery date to November 2025.","startDate":"2022-07-15","endDate":"2030-06-14","scheduleNarrative":"The project's end-date at 24/25-Q4 is scheduled to be 14/06/2030. This is primarily due to the following factors‚ Project closure is currently scheduled for 27/12/29 following the delivery of the Hybrid - Cluster 4 milestone and the ASAP - Hybrid Mobilisation milestone. There is an assumption that the transition to BAU will be 5.5 months in duration following delivery of the Project Closure milestone, which has generated a Programme Closure milestone date of 14/06/30. *Please note that the current plans indicate 4 clusters of delivery, however, this is very likely to change based on the requirement to adapt the delivery approach due to the introduction of new and revised commercial practices and potential outputs from current market engagement. This may be reflected in the baselining of the plan following final HMT OBC approval.","fyBaseline":4.58,"fyForecast":3.92,"fyVariance":14.41,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ Higher than expected design costs received placed a significant pressure on 2024/25 FY budget, limiting the programme’s ability to fund commercial resource requirements to complete critical activities. A Change Request for an uplift of £0.67m to the 2024/25 approved budget was approved in February 2025. Areas of underspend were driven by delays in recruitment due to uncertainty around the timing of approved funding, which impacted the programme’s ability to onboard required resources in a timely manner. Additionally, an internal recruitment freeze and challenges in securing specialist resources quickly enough further contributed to the underspend.","wholeLifeCost":72079.0,"costNarrative":"The project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) is 72079. This is primarily due to the following factors‚ This comprises of Programme costs up until 2029/30 FY and 10 year commercial contract costs up to 2038/39 FY - equating to around £6-7bn per annum.","benefits":0.0,"benefitsNarrative":"The project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) is 0. This is primarily due to the following factors‚ We have not monetised any benefits yet but will do so at Outline Business Case (OBC) stage.","themes":["Delivery & schedule","Cost & funding","Commercial & supply chain","Approvals & decisions"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER. This is due to‚ Programme had a new SRO from February 2025. Although the initial resource constraints have been reduced the programme continues to require further resources as the programme grows including support for key enabler activities. Delivery Model…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"HO_0286_2324-Q2","year":2026,"name":"Asylum Support Accommodation Programme","department":"HO","category":"Government Transformation and Service Delivery","description":"The Asylum Support Accommodation Programme (ASAP) is focused on establishing new delivery and commercial arrangements for asylum accommodation and support services, with the aim of creating a more sustainable, scalable and effective system. The programme will deliver a suite of new and transformed contracts as part of a wider operating model, supported by enhanced management capability to improve oversight and system performance. ASAP will also replace a number of existing contracts, including the Asylum Accommodation and Support Contracts (AASC), Advice, Issue Reporting and Eligibility (AIRE), and Asylum Support Payments (ASP). This transition reflects the need to address affordability pressures, strengthen contract management, and reduce risks associated with the current delivery model.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) at 2025/26 Q4 increased to Red. This reflects the findings of a recent Programme Assurance Review (PAR), which highlighted significant delivery complexity and sustained pressure across key enabling functions. A revised Business Transformation Delivery Model has been endorsed, representing a change in project definition and requiring a period of re‑planning and re‑baselining across the programme. The programme continues to work towards submission of the OBC1 (FACT) which the PAR team will return to assess, and subject to a successful review, the programme will return to an Amber status for the OBC to be reviewed at InvestCo. In January 26, the Bridging Accommodation & Services Project (BASP) was closed as its original aims were no longer achievable. Activity is underway to establish the Collective Accommodation Management Service (CAMS) project within the scope of ASAP.","startDate":null,"endDate":"2029-12-21","scheduleNarrative":"The programme end date remains 14 June 2030 and is unchanged, reflecting current delivery and transition assumptions. Project closure is scheduled for 21 December 2029, following delivery of the Hybrid – Cluster 4 milestone and the ASAP – Hybrid Mobilisation milestone. This is followed by an estimated transition period of approximately 5.5 months to business‑as‑usual operations, resulting in a programme closure date of June 2030. The ASAP Programme Plan has been approved and baselined, with further work undertaken to strengthen planning quality across all levels of the programme. Detailed resource requirements are being developed to provide a comprehensive view of demand across the programme. Change control processes have been refined and aligned with established governance arrangements under the Senior Responsible Owner, ensuring that the impacts of any changes to the delivery model are fully understood and managed. Work is also ongoing to ensure that the programme plan reflects the integration of key enabling functions required to support effective management control, underpinned by a comprehensive reporting framework.","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"The projects departmentally agreed Benefits at 25/26 Q4 (measured in £m) is 0. The programme has not yet agreed benefits profiles, these are still being developed and will be agreed at Outline Business Case stage.","themes":["Delivery & schedule","Governance & assurance","Commercial & supply chain","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) at 2025/26 Q4 increased to Red. This reflects the findings of a recent Programme Assurance Review (PAR), which highlighted significant delivery complexity and sustained pressure across key enabling functions. A revised Business Transformation Delivery Model has been…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"HO_0286_2324-Q2","year":2025,"name":"Asylum Support Accommodation Programme","department":"HO","category":"Government Transformation and Service Delivery","description":"The Asylum Support Accommodation Programme (ASAP) aims to establish new delivery and commercial arrangements with two objectives in mind: 1-ASAP will deliver a suite of new and transformed asylum accommodation and support services contracts as part of a wider new model of provision which is both sustainable and scalable, supported by enhanced management capabilities to operate the system more effectively. 2-To replace existing contracts (specifically Asylum Accommodation and Support Contracts (AASC), Advice, Issue Reporting and Eligibility (AIRE) and Asylum Support Payments (ASP). The accommodation being delivered through the existing AASC contracts is very expensive, the management control provided within the contracts is limited, and there is elevated risk of market failure through the current suppliers.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER. This is due to‚ Programme had a new SRO from February 2025. Although the initial resource constraints have been reduced the programme continues to require further resources as the programme grows including support for key enabler activities. Delivery Model Assessment (DMA) work is ongoing with the final report due for approval at the Programme Board on 03/06/2025. A planning workshop was held with enabling teams to reduce the forecasted Outline Business Case (OBC) delivery date to November 2025.","startDate":"2022-07-15","endDate":"2030-06-14","scheduleNarrative":"The project's end-date at 24/25-Q4 is scheduled to be 14/06/2030. This is primarily due to the following factors‚ Project closure is currently scheduled for 27/12/29 following the delivery of the Hybrid - Cluster 4 milestone and the ASAP - Hybrid Mobilisation milestone. There is an assumption that the transition to BAU will be 5.5 months in duration following delivery of the Project Closure milestone, which has generated a Programme Closure milestone date of 14/06/30. *Please note that the current plans indicate 4 clusters of delivery, however, this is very likely to change based on the requirement to adapt the delivery approach due to the introduction of new and revised commercial practices and potential outputs from current market engagement. This may be reflected in the baselining of the plan following final HMT OBC approval.","fyBaseline":4.58,"fyForecast":3.92,"fyVariance":14.41,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ Higher than expected design costs received placed a significant pressure on 2024/25 FY budget, limiting the programme’s ability to fund commercial resource requirements to complete critical activities. A Change Request for an uplift of £0.67m to the 2024/25 approved budget was approved in February 2025. Areas of underspend were driven by delays in recruitment due to uncertainty around the timing of approved funding, which impacted the programme’s ability to onboard required resources in a timely manner. Additionally, an internal recruitment freeze and challenges in securing specialist resources quickly enough further contributed to the underspend.","wholeLifeCost":72079.0,"costNarrative":"The project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) is 72079. This is primarily due to the following factors‚ This comprises of Programme costs up until 2029/30 FY and 10 year commercial contract costs up to 2038/39 FY - equating to around £6-7bn per annum.","benefits":0.0,"benefitsNarrative":"The project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) is 0. This is primarily due to the following factors‚ We have not monetised any benefits yet but will do so at Outline Business Case (OBC) stage.","themes":["Delivery & schedule","Cost & funding","Commercial & supply chain","Approvals & decisions"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER. This is due to‚ Programme had a new SRO from February 2025. Although the initial resource constraints have been reduced the programme continues to require further resources as the programme grows including support for key enabler activities. Delivery Model…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":1,"transition":"Worsened","endDateDeltaDays":-175,"attentionScore":74,"attentionReasons":["Current published delivery confidence is Red","Published rating worsened from Amber to Red","In-year forecast variance is +43.0%"]},{"id":"MOD_0033_1112-Q1","year":2026,"name":"MARSHALL","department":"MOD","category":"Military Capability","description":"Marshall enables military terminal air traffic management services in the UK and abroad. This is achieved through a service provision contract with Aquila, a joint venture company of Thales and NATS, which also involves a significant update of obsolete equipment across the estate. Marshall combines some seventy previous equipment and support contracts into a single service delivery contract. It is delivered through fifteen technical services, supporting hub and satellite geographically clustered services. Marshall provides cost and workforce savings, significant equipment upgrades, and ensures compliance with the latest civil and military aviation regulatory requirements. Legacy technical services were transferred to Aquila in April 2015. The new services are principally delivered, maturing and typically performing above target.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 decreased to RED. This is primarily due to the following factors. 1. The Programme is seeking to resolve several commercial issues with the preferred option subject to Investment Approval Committee in the early part of FY26/27. Although new equipment delivery stands at over 92% and Notice of Service Availability, the key indicator toward Full Operating Capability (FOC), is over 50%, there are five equipment installation outliers that will not deliver by the currently approved 31 Oct 26 date.","startDate":"2006-04-03","endDate":"2026-10-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 31/10/2026. This is primarily due to the following factors. 1. Although the reported end date remains unchanged from Q4 24/25, the Programme will be seeking approval for a revised Full Operating Capability and Programme end date.","fyBaseline":124.74,"fyForecast":80.5,"fyVariance":35.46,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors: 1. In-Year underspend is the result of reprofiling into later years the outstanding equipment installations and Centre-directed saving measures (both deletions and deferrals).","wholeLifeCost":1997.56,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) increased from £1828M to £1870M. This is primarily due to the following factors. 1. This uplift reflects the increase in Programme scope to include additional safety critical and operationally essential change required by the Front Line Commands, and delays from previous FYs and added risk because of emerging changes. 2. However, the Programme continues to remain affordable and within its Approved Budgetary Level.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 decreased to RED. This is primarily due to the following factors. 1. The Programme is seeking to resolve several commercial issues with the preferred option subject to Investment Approval Committee in the early part of FY26/27. Although new equipment…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"MOD_0033_1112-Q1","year":2020,"name":"MARSHALL","department":"MOD","category":"Military Capability","description":"Delivering a sustainable Air Traffic Management capability.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber, which has declined since last year�s Q2 1819 Amber/Green, due primarily to the following factors; - Installation of new regulatory-compliant airfield Secondary Surveillance equipment (Wide Area Multilateration - WAM) highlighted performance issues with certain military aircraft types operating non-compliant transponder systems. This meant that the new systems could not be accepted into operational use alongside the legacy primary radar systems. - System users raised concerns regarding the ability to detect and track civilian aircraft with non-compliant secondary surveillance transponder systems (or no transponders at all) when Wide Area Multilateration (WAM) was used alongside legacy primary radar equipment. This meant that WAM could not be brought into operational use. Since the Q2 1920 (30th September 2019) Amber IPA DCA, the following primary project actions have impacted the original Q2 IPA DCA; - The programme schedule has been revised in order to prioritise the delivery of new primary surveillance systems. Performance of the new radars will address user concerns associated with Wide Area Multilateration detection of aircraft operating non-compliant secondary surveillance transponders (or no transponders at all). - Legacy secondary surveillance systems will remain in place until the new and more capable primary radars are delivered by the programme.","startDate":"2006-04-03","endDate":"2024-12-31","scheduleNarrative":"The scheduled baseline project end date at Q2 1920 (30th September 2019) is 31/12/24, has not changed since last year's Q2 1819 date of 31/12/24, due primarily to the following factors; - Equipment delivery across the scope of the programme has progressed well. - Service support to both legacy and newly-installed equipment has been good. Since the Q2 1920 (30th September 2019) baseline project end date of 31/12/24, the following primary project actions have impacted the original Q2 baseline project end date; - Replanning has been conducted to prioritise the delivery of primary surveillance radar equipment, but associated changes have not taken the projected end date beyond the existing Baseline End Date (aligned with Approvals). - Delivery of new air traffic management systems such as radios, navigation aids, etc., has continued at pace while replanning for the surveillance systems has been underway.","fyBaseline":127.26,"fyForecast":129.15,"fyVariance":1.0,"varianceNarrative":"Budget variance less than 5%","wholeLifeCost":1335.62,"costNarrative":"The baseline Whole Life Cost at Q2 1920 (30th September 2019) is �1,335.62 m, has decreased by �471.97 m since last year's Q2 1819 (�m) baseline Whole Life Cost of �1,807.59 m, due primarily to the following factors; - Programme MARSHALL remains affordable and is on track to deliver FOC well ahead of Approval (December 2024). The Whole Life Costs recorded in the report are not comparable; the 18/19 figures take into account the full life of the programme (to 2037) whilst the 19/20 figure presents a snapshot of only the first 10 years. - This accounts for the perceived discrepancy. The true forecast position is a variance of less than 1.5% growth over the 12 month reporting period.","benefits":null,"benefitsNarrative":"","themes":["Delivery & schedule","Cost & funding","Approvals & decisions","Scope & requirements"],"evidenceExcerpt":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber, which has declined since last year�s Q2 1819 Amber/Green, due primarily to the following factors; - Installation of new regulatory-compliant airfield Secondary Surveillance equipment (Wide Area Multilateration - WAM) highlighted performance issues with certain…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2020","sourceLabel":"IPA Annual Report 2019-20"},{"id":"MOD_0033_1112-Q1","year":2021,"name":"Marshall","department":"MOD","category":"Military Capability","description":"Marshall enables military terminal air traffic management services in the UK and abroad. Marshall combines some 70+ previous equipment and support contracts into a single service delivery contract. It is delivered through 15 technical services and replaces previous arrangements with a regionalised support model, supporting hub and satellite geographically-clustered services.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating decreased from Amber to Amber/Green. This is primarily due to the following factors: The Programme is still undergoing significant 'first of class' activity, including the implementation of the first Hub and Satellite to deliver Air Traffic Control Services regionally. The Lincolnshire Hub is scheduled to be established in October 21, with software development and network security challenges ongoing. However, the Marshall 'all-up capability package' has been delivered at RAF Shawbury and entered Full Operational Service in January 2021. The experience at Shawbury has provided an opportunity for considerable learning from experience, which will smooth future equipment delivery and transition activity.","startDate":"2006-04-03","endDate":"2024-12-31","scheduleNarrative":"Compared to financial year 19/20-Q2, the project's end-date remained scheduled to finish on 31 December 2024 . This is primarily due to the following factors:","fyBaseline":144.25,"fyForecast":147.4,"fyVariance":2.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":1504.42,"costNarrative":"Compared to financial year 19/20-Q2, the projects Baseline Whole Life Cost increased from �1335.62m to �1504.42m. This is primarily due to the following factors: The reported Baseline Whole Life Costs run until Financial Year 29/30 and do not take into account the full life of the programme, which ends in 2037. Therefore, the Baseline Whole Life Costs will increase year-on-year until 2027 at which point all remaining years will be contained within the Annual Budgetary Cycle period. The programme currently remains affordable and within Approved Budgetary Limit. A Review Note has been submitted that is seeking an uplift in Approved Budgetary Limit to facilitate future changes to be funded by the Front-Line Commands.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating decreased from Amber to Amber/Green. This is primarily due to the following factors: The Programme is still undergoing significant 'first of class' activity, including the implementation of the first Hub and Satellite to deliver Air Traffic…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21"},{"id":"MOD_0033_1112-Q1","year":2022,"name":"MARSHALL","department":"MOD","category":"Military Capability","description":"Marshall enables military terminal air traffic management services in the UK and abroad.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 20/21-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating decreased from Amber/Green to Amber. This is primarily due to the following factors: The removal of the incremental Amber/Green and Amber/Red assessment ratings. There has been successful Site-Specific Assurance and Commissioning Board at RAF Shawbury in Nov 20. The Shawbury 'all-up capability package' comprising the STAR-NG Primary Surveillance Radar, the Wide Area Multilateration system and the TopSky tower interface system and displays, achieved Full Operational Service on 18 January 21 (Programme Initial Operating Capability). This model is now being replicated across Defence.","startDate":"2006-04-03","endDate":"2024-12-31","scheduleNarrative":"Compared to 2021-Q4, the project end-date remained scheduled to finish on 31 December 2024.","fyBaseline":145.4,"fyForecast":134.51,"fyVariance":-8.0,"varianceNarrative":"The budget variance exceeds 5%. This is principally due to re-scheduling as part of the Primary Radar Surveillance optimisation approach which has seen some re-profiling of milestones. In addition, technical integration difficulties exacerbated by Covid 19 have caused a 9-month delay to the deployable Air Traffic Control equipment milestones. However, the equipment will still be delivered within programme Full Operating Capability.","wholeLifeCost":1564.0,"costNarrative":"Compared to 2021-Q4, the projects Baseline Whole Life Cost has increased by £60M (£1504.42M at Q4 20/21 and £1564.303M at Q4 21/22). This is primarily due to the following factors: The inclusion of a budget for FY 31/32. The programme remains affordable and is within the increased Approved Budgetary Level of £1968.8M approved in November 21. This uplift reflects the increase in programme scope to include safety critical and operationally essential change required by Front Line Commands.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Workforce & capability","Delivery & schedule","Technical & integration"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating decreased from Amber/Green to Amber. This is primarily due to the following factors: The removal of the incremental Amber/Green and Amber/Red assessment ratings. There has been successful Site-Specific Assurance and Commissioning Board at RAF Shawbury…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"MOD_0033_1112-Q1","year":2023,"name":"MARSHALL","department":"MOD","category":"Military Capability","description":"Marshall enables military terminal air traffic management services in the UK and abroad.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 21/22-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. Hub and Satellite operations commenced at the Lincolnshire Terminal Air Traffic Control Centre in April 2022, which enabled Waddington radar services to be delivered from Coningsby. Hub and Satellite operations from Terminal Air Traffic Control Centre (East) at Marham will start in April 2023 with the relocation of Wittering radar services, and the first Hub and Satellite operations from Terminal Air Traffic Control Centre (South) at Brize Norton are due to start in June 2023 with the transfer of Benson radar services. Work continues to address the known risks and issues with the Programme, including identifying mitigations to a potential delay to achieving the Full Operating Capability milestone.","startDate":"2006-04-03","endDate":"2024-12-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2024-12-31. This is primarily due to the following factors. NA","fyBaseline":116.49,"fyForecast":84.75,"fyVariance":-27.0,"varianceNarrative":"The budget variance exceeds 5% This is primarily due to the following factors: Delays in new equipment roll-out against the schedule and re-alignment by Defence Equipment and Support of previously mis-aligned accruals. The In-Year Marshall underspend has been absorbed by Programme of Work bring-forward spend elsewhere across the wider Air Capability portfolio, with the commensurate Marshall costs re-profiled into Years 1 and 2.","wholeLifeCost":1573.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 increased from 1564m. to 1573m. This is primarily due to the following factors. Reflects the inclusion of Private Sector Support costs over the Annual Budget Cycle period. The programme remains affordable, with cost increase contained within the Approved Budgetary Limit.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This programme does not report cashable benefits. Its aim is to provision the armed forces with the equipment and / or infrastructure required.","themes":["Cost & funding","Delivery & schedule","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. Hub and Satellite operations commenced at the Lincolnshire Terminal Air Traffic Control Centre in April 2022, which enabled Waddington radar services to be delivered from…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"MOD_0033_1112-Q1","year":2024,"name":"MARSHALL","department":"MOD","category":"Military Capability","description":"Marshall enables military terminal air traffic management services in the UK and abroad. This is achieved through a service provision contract, which also involves a significant update of obsolete equipment across the estate. Marshall combines some seventy previous equipment and support contracts into a single service delivery contract. It is delivered through fifteen technical services; supporting hub and satellite geographically clustered services. Marshall provides cost and workforce savings, significant equipment upgrades, and ensures compliance with the latest civil and military aviation regulatory requirements. Legacy technical services were transferred in April 2015. The new services are principally delivered, maturing and typically performing above target.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The Programme Delivery Confidence Assessment remains Amber although with an improving trend. Work continues to address the known risks and issues which appear resolvable at this stage. Elsewhere, Hub and Satellite operations from the Terminal Air Traffic Control Centre (TATCC) (East) at Marham began in Apr 23 with the transfer of Wittering radar services. The first Hub and Satellite operations from TATCC (South) commenced in Jun 23 when Benson radar services relocated to Brize Norton.","startDate":"2006-04-03","endDate":"2026-10-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 increased from 2024-12-31 to 2026-10-31. This is primarily due to the following factors. Adjustments in the delivery of new equipment to some Programme outliers has necessitated a slip in the Programme’s Full Operating Capability (FOC) and Programme Closure milestones. These changes will not result in any cost increase nor operational impact. Potential mitigating options are being explored to bring forward equipment delivery against the revised FOC date.","fyBaseline":100.06,"fyForecast":92.16,"fyVariance":-7.895,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. Contractor resourcing issues, meaning that some new equipment roll-out milestones have slipped beyond this FY but with no impact to the achievement of FOC by October 26 at this time.","wholeLifeCost":1774.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 increased from 1573m to 1774m. This uplift reflects the increase in programme scope to include safety critical and operationally essential change required by the Front Line Commands. The programme remains affordable.","benefits":0.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 0m.","themes":["Cost & funding","Delivery & schedule","Workforce & capability","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The Programme Delivery Confidence Assessment remains Amber although with an improving trend. Work continues to address the known risks and issues which appear resolvable at…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"MOD_0033_1112-Q1","year":2025,"name":"MARSHALL","department":"MoD","category":"Military Capability","description":"Marshall enables military terminal air traffic management services in the UK and abroad. This is achieved through a service provision contract with Aquila, a joint venture company of Thales and NATS, which also involves a significant update of obsolete equipment across the estate. Marshall combines some seventy previous equipment and support contracts into a single service delivery contract. It is delivered through fifteen technical services, supporting hub and satellite geographically clustered services. Marshall provides cost and workforce savings, significant equipment upgrades, and ensures compliance with the latest civil and military aviation regulatory requirements. Legacy technical services were transferred to Aquila in April 2015. The new services are principally delivered, maturing and typically performing above target.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. Work continues to address the known risks and issues with resolution being sought in conjunction with the Delivery Team and the Contractor. Accessing sufficiently qualified and experienced people to deliver critical network migration issues such as the BT Withdrawal of Analogue and Kilostream services and Synchronised Digital Hierarchy are a concern, as well as funding decisions imposed on the Programme following MOD Centre arbitration. St Kilda, the Falklands, and Gibraltar are impacted by the above impending issue also.","startDate":"2006-04-03","endDate":"2026-10-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/10/2026. This is primarily due to the following factors. No change in project end-date.","fyBaseline":104.71,"fyForecast":89.63,"fyVariance":14.4,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. An In-Year reduction caused by fade and re-profiling into Year 1 of ABC25. There is little to indicate that this will affect the Full Operating Capability delivery milestone.","wholeLifeCost":1828.06,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 1774 to 1828. This is primarily due to the following factors. This uplift reflects the increase in programme scope to include additional safety critical and operationally essential change required by the Front Line Commands. The Programme remains affordable and within the Approved Budgetary Level.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Delivery & schedule","Technical & integration","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. Work continues to address the known risks and issues with resolution being sought in conjunction with the Delivery Team and the Contractor. Accessing sufficiently qualified and experienced people to…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"MOD_0033_1112-Q1","year":2026,"name":"MARSHALL","department":"MOD","category":"Military Capability","description":"Marshall enables military terminal air traffic management services in the UK and abroad. This is achieved through a service provision contract with Aquila, a joint venture company of Thales and NATS, which also involves a significant update of obsolete equipment across the estate. Marshall combines some seventy previous equipment and support contracts into a single service delivery contract. It is delivered through fifteen technical services, supporting hub and satellite geographically clustered services. Marshall provides cost and workforce savings, significant equipment upgrades, and ensures compliance with the latest civil and military aviation regulatory requirements. Legacy technical services were transferred to Aquila in April 2015. The new services are principally delivered, maturing and typically performing above target.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 decreased to RED. This is primarily due to the following factors. 1. The Programme is seeking to resolve several commercial issues with the preferred option subject to Investment Approval Committee in the early part of FY26/27. Although new equipment delivery stands at over 92% and Notice of Service Availability, the key indicator toward Full Operating Capability (FOC), is over 50%, there are five equipment installation outliers that will not deliver by the currently approved 31 Oct 26 date.","startDate":"2006-04-03","endDate":"2026-10-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 31/10/2026. This is primarily due to the following factors. 1. Although the reported end date remains unchanged from Q4 24/25, the Programme will be seeking approval for a revised Full Operating Capability and Programme end date.","fyBaseline":124.74,"fyForecast":80.5,"fyVariance":35.46,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors: 1. In-Year underspend is the result of reprofiling into later years the outstanding equipment installations and Centre-directed saving measures (both deletions and deferrals).","wholeLifeCost":1997.56,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) increased from £1828M to £1870M. This is primarily due to the following factors. 1. This uplift reflects the increase in Programme scope to include additional safety critical and operationally essential change required by the Front Line Commands, and delays from previous FYs and added risk because of emerging changes. 2. However, the Programme continues to remain affordable and within its Approved Budgetary Level.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 decreased to RED. This is primarily due to the following factors. 1. The Programme is seeking to resolve several commercial issues with the preferred option subject to Investment Approval Committee in the early part of FY26/27. Although new equipment…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"MOD_0033_1112-Q1","year":2025,"name":"MARSHALL","department":"MoD","category":"Military Capability","description":"Marshall enables military terminal air traffic management services in the UK and abroad. This is achieved through a service provision contract with Aquila, a joint venture company of Thales and NATS, which also involves a significant update of obsolete equipment across the estate. Marshall combines some seventy previous equipment and support contracts into a single service delivery contract. It is delivered through fifteen technical services, supporting hub and satellite geographically clustered services. Marshall provides cost and workforce savings, significant equipment upgrades, and ensures compliance with the latest civil and military aviation regulatory requirements. Legacy technical services were transferred to Aquila in April 2015. The new services are principally delivered, maturing and typically performing above target.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. Work continues to address the known risks and issues with resolution being sought in conjunction with the Delivery Team and the Contractor. Accessing sufficiently qualified and experienced people to deliver critical network migration issues such as the BT Withdrawal of Analogue and Kilostream services and Synchronised Digital Hierarchy are a concern, as well as funding decisions imposed on the Programme following MOD Centre arbitration. St Kilda, the Falklands, and Gibraltar are impacted by the above impending issue also.","startDate":"2006-04-03","endDate":"2026-10-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/10/2026. This is primarily due to the following factors. No change in project end-date.","fyBaseline":104.71,"fyForecast":89.63,"fyVariance":14.4,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. An In-Year reduction caused by fade and re-profiling into Year 1 of ABC25. There is little to indicate that this will affect the Full Operating Capability delivery milestone.","wholeLifeCost":1828.06,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 1774 to 1828. This is primarily due to the following factors. This uplift reflects the increase in programme scope to include additional safety critical and operationally essential change required by the Front Line Commands. The Programme remains affordable and within the Approved Budgetary Level.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Delivery & schedule","Technical & integration","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. Work continues to address the known risks and issues with resolution being sought in conjunction with the Delivery Team and the Contractor. Accessing sufficiently qualified and experienced people to…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":1,"transition":"Worsened","endDateDeltaDays":0,"attentionScore":72,"attentionReasons":["Current published delivery confidence is Red","Published rating worsened from Amber to Red","In-year forecast variance is +35.5%"]},{"id":"MOJ_0111_2122-Q2","year":2026,"name":"10K Additional Prison Places Estate Expansion Category D","department":"MOJ","category":"Infrastructure and Construction","description":"The Category D Programme supports our 20,000 additional prison places commitment; it will provide additional permanent places across the Category D open prison estate","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25-Q4, the NISTA Delivery Confidence Assessment rating at 25/26-Q4 remains at Red. This is primarily due to issues arising from the administration of a key supplier.","startDate":"2020-01-24","endDate":"2031-03-20","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end date at 25/26-Q4 changed from 20/09/29 to 20/03/31.​ This is primarily due to the programme’s key supplier entering administration and the resulting delays on delivery.","fyBaseline":11.85,"fyForecast":19.67,"fyVariance":65.99,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to supplier administration and the resulting effect on programme costs.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"This programme currently reports no monetised benefits. Due to the projected increasing prisons population, this programme focusses on increasing capacity and there are no monetised benefits to be claimed. The programme's other benefits are defined in the current baseline as: construction benefits and outcomes (capacity, modern methods of construction and sustainability); to enable an improvement in prisoner rehabilitation outcomes; and, during its construction, deliver local community benefits.","themes":["Commercial & supply chain","Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 24/25-Q4, the NISTA Delivery Confidence Assessment rating at 25/26-Q4 remains at Red. This is primarily due to issues arising from the administration of a key supplier. Compared to financial year 24/25-Q4, the project's end date at 25/26-Q4 changed from 20/09/29 to 20/03/31.​ This is primarily due to the programme’s key supplier…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"MOJ_0111_2122-Q2","year":2023,"name":"10K Additional Prison Places Estate Expansion Category D","department":"MOJ","category":"Infrastructure and Construction","description":"The Programme's scope is to deliver 1,320 places across the Category D estate.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 is Amber. This is primarily due to the following factors. This is the first time data has been published for this programme, which has been added to GMPP over the last year.This programme was formerly reporting as part of the 10k Additional Prison Places Estates Expansion Programme.The Amber assessment is driven by inflation risks.","startDate":"2020-01-24","endDate":null,"scheduleNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","fyBaseline":136.68,"fyForecast":27.76,"fyVariance":-80.0,"varianceNarrative":"Costs for the two phases have been re-profiled into future financial years, due to rescoping elements of the programme.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This project currently reports no monetised benefits. Due to the projected increasing prisons population, this project focusses on increasing capacity and there are no monetised benefits to be claimed. The programme's other benefits are defined in the current baseline as: construction benefits and outcomes (capacity, modern methods of construction and sustainability); to enable an improvement in prisoner rehabilitation outcomes; and, during its construction, deliver local community benefits.","themes":["Commercial & supply chain","Cost & funding","Delivery & schedule","Technical & integration"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 is Amber. This is primarily due to the following factors. This is the first time data has been published for this programme, which has been added to GMPP over the last year.This programme was formerly reporting as part of the 10k Additional Prison Places Estates…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"MOJ_0111_2122-Q2","year":2024,"name":"10K Additional Prison Places Estate Expansion Category D","department":"MOJ","category":"Infrastructure and Construction","description":"The Category D Programme supports our 20,000 additional prison places commitment; its scope is to deliver 1,320 permanent places across the Category D open prison estate.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. Risks to timelines and inflation risks contributing to the increasing cost estimate, which is greater than that estimated previously.","startDate":"2020-01-24","endDate":null,"scheduleNarrative":"Exempt under Section 22 of the Freedom of Information Act 2000 (Information intended for future publication)","fyBaseline":88.63,"fyForecast":47.15,"fyVariance":-47.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The underspend is due to costs for the two phases having been re-profiled into future financial years, following delays stemming from planning issues and challenging site conditions, and the rescoping of certain elements of the programme.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":0.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 0m. This project currently reports no monetised benefits. Due to the projected increasing prisons population, this project focusses on increasing capacity and there are no monetised benefits to be claimed. The programme's other benefits are defined in the current baseline as: construction benefits and outcomes (capacity, modern methods of construction and sustainability); to enable an improvement in prisoner rehabilitation outcomes; and, during its construction, deliver local community benefits.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. Risks to timelines and inflation risks contributing to the increasing cost estimate, which is greater than that estimated previously. Exempt under Section 22 of the…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"MOJ_0111_2122-Q2","year":2025,"name":"10K Additional Prison Places Estate Expansion Category D","department":"MoJ","category":"Infrastructure and Construction","description":"The Category D Programme supports our 20,000 additional prison places commitment; it will provide additional permanent places across the Category D open prison estate.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 decreased from AMBER to RED. This is primarily due to the following factors‚ The programme’s key supplier entered administration.","startDate":"2020-01-24","endDate":"2029-09-20","scheduleNarrative":"The project's end-date at 24/25-Q4 is scheduled to be 20/09/2029. This is primarily due to the following factors‚ The programme’s key supplier entered administration.","fyBaseline":152.22,"fyForecast":27.26,"fyVariance":82.09,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ This is due to delays stemming from supplier administration and the rescoping of some elements of the programme, requiring some costs to be re-profiled into future financial years.","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ This project currently reports no monetised benefits. Due to the projected increasing prisons population, this project focusses on increasing capacity and there are no monetised benefits to be claimed. The programme's other benefits are defined in the current baseline as: construction benefits and outcomes (capacity, modern methods of construction and sustainability); to enable an improvement in prisoner rehabilitation outcomes; and, during its construction, deliver local community benefits.","themes":["Commercial & supply chain","Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 decreased from AMBER to RED. This is primarily due to the following factors‚ The programme’s key supplier entered administration. The project's end-date at 24/25-Q4 is scheduled to be 20/09/2029. This is primarily due to the…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"MOJ_0111_2122-Q2","year":2026,"name":"10K Additional Prison Places Estate Expansion Category D","department":"MOJ","category":"Infrastructure and Construction","description":"The Category D Programme supports our 20,000 additional prison places commitment; it will provide additional permanent places across the Category D open prison estate","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25-Q4, the NISTA Delivery Confidence Assessment rating at 25/26-Q4 remains at Red. This is primarily due to issues arising from the administration of a key supplier.","startDate":"2020-01-24","endDate":"2031-03-20","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end date at 25/26-Q4 changed from 20/09/29 to 20/03/31.​ This is primarily due to the programme’s key supplier entering administration and the resulting delays on delivery.","fyBaseline":11.85,"fyForecast":19.67,"fyVariance":65.99,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to supplier administration and the resulting effect on programme costs.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"This programme currently reports no monetised benefits. Due to the projected increasing prisons population, this programme focusses on increasing capacity and there are no monetised benefits to be claimed. The programme's other benefits are defined in the current baseline as: construction benefits and outcomes (capacity, modern methods of construction and sustainability); to enable an improvement in prisoner rehabilitation outcomes; and, during its construction, deliver local community benefits.","themes":["Commercial & supply chain","Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 24/25-Q4, the NISTA Delivery Confidence Assessment rating at 25/26-Q4 remains at Red. This is primarily due to issues arising from the administration of a key supplier. Compared to financial year 24/25-Q4, the project's end date at 25/26-Q4 changed from 20/09/29 to 20/03/31.​ This is primarily due to the programme’s key supplier…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"MOJ_0111_2122-Q2","year":2025,"name":"10K Additional Prison Places Estate Expansion Category D","department":"MoJ","category":"Infrastructure and Construction","description":"The Category D Programme supports our 20,000 additional prison places commitment; it will provide additional permanent places across the Category D open prison estate.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 decreased from AMBER to RED. This is primarily due to the following factors‚ The programme’s key supplier entered administration.","startDate":"2020-01-24","endDate":"2029-09-20","scheduleNarrative":"The project's end-date at 24/25-Q4 is scheduled to be 20/09/2029. This is primarily due to the following factors‚ The programme’s key supplier entered administration.","fyBaseline":152.22,"fyForecast":27.26,"fyVariance":82.09,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ This is due to delays stemming from supplier administration and the rescoping of some elements of the programme, requiring some costs to be re-profiled into future financial years.","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ This project currently reports no monetised benefits. Due to the projected increasing prisons population, this project focusses on increasing capacity and there are no monetised benefits to be claimed. The programme's other benefits are defined in the current baseline as: construction benefits and outcomes (capacity, modern methods of construction and sustainability); to enable an improvement in prisoner rehabilitation outcomes; and, during its construction, deliver local community benefits.","themes":["Commercial & supply chain","Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 decreased from AMBER to RED. This is primarily due to the following factors‚ The programme’s key supplier entered administration. The project's end-date at 24/25-Q4 is scheduled to be 20/09/2029. This is primarily due to the…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":546,"attentionScore":70,"attentionReasons":["Current published delivery confidence is Red","Published end date moved 546 days later","In-year forecast variance is +66.0%"]},{"id":"MOJ_0113_2122-Q2","year":2026,"name":"10K Additional Prison Places Estate Expansion Houseblocks and Refurbishments","department":"MOJ","category":"Infrastructure and Construction","description":"The Houseblocks and Refurbishments Programme supports our 20,000 additional prison places commitment; its scope is to deliver around 2000 additional prison places, primarily in the closed male category B and C estate. This includes modern, purpose-built houseblocks which will provide improved living space for prisoners and a safer working environment for staff.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25-Q4, the NISTA Delivery Confidence Assessment (DCA) rating at 25/26-Q4 remains at Red. This is primarily due to the administration of a key supplier.","startDate":"2019-08-15","endDate":"2031-02-05","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 changed from 05/08/29 to 05/02/31. This is primarily due to delays emerging from a key delivery supplier entering into administration.","fyBaseline":58.47,"fyForecast":25.2,"fyVariance":56.9,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to supplier administration and the resulting effect on programme costs.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"This programme currently reports no monetised benefits. This programme focusses on increasing capacity and there are no monetised benefits to be claimed. The programme's other benefits are defined in the current baseline as: construction benefits and outcomes (capacity, modern methods of construction and sustainability); to enable an improvement in prisoner rehabilitation outcomes; and, during its construction, deliver local community benefits.​","themes":["Commercial & supply chain","Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 24/25-Q4, the NISTA Delivery Confidence Assessment (DCA) rating at 25/26-Q4 remains at Red. This is primarily due to the administration of a key supplier. Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 changed from 05/08/29 to 05/02/31. This is primarily due to delays emerging from a key delivery supplier…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"MOJ_0113_2122-Q2","year":2023,"name":"10k additional prison places Estate Expansion Houseblocks and Refurbishments","department":"MOJ","category":"Infrastructure and Construction","description":"This programme will deliver around 1,785 additional prison places in the closed male category B and C estate. This includes modern, purpose-built houseblocks which will provide improved living space for prisoners and a safer working environment for staff.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 is Amber. This is primarily due to the following factors. This is thefirst timedata has been published for this project, which has been added to GMPP over the last year.This programme was formerly reporting as part of the 10k Additional Prison Places Estates Expansion Programme.The Amber assessment is driven by inflation risk and recruitment challenges. The programme has successfully delivered one site.","startDate":"2019-08-15","endDate":null,"scheduleNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","fyBaseline":194.21,"fyForecast":65.38,"fyVariance":-66.0,"varianceNarrative":"The underspend is due to the descoping of the Rye Hill project from the programme and delays to elements of the programme that have necessitatedcosts to be re-profiled into future financial years.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This project currently reports no monetised benefits. Due to the projected increasing prisons population, this project focusses on increasing capacity and there are no monetised benefits to be claimed. The programme's other benefits are defined in the current baseline as: construction benefits and outcomes (capacity, modern methods of construction and sustainability); to enable an improvement in prisoner rehabilitation outcomes; and, during its construction, deliver local community benefits.","themes":["Commercial & supply chain","Cost & funding","Delivery & schedule"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 is Amber. This is primarily due to the following factors. This is thefirst timedata has been published for this project, which has been added to GMPP over the last year.This programme was formerly reporting as part of the 10k Additional Prison Places Estates Expansion…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"MOJ_0113_2122-Q2","year":2024,"name":"10k additional prison places Estate Expansion Houseblocks and Refurbishments","department":"MOJ","category":"Infrastructure and Construction","description":"The Houseblocks and Refurbishments Programme supports our 20,000 additional prison places commitment; its scope is to deliver around 2000 additional prison places, primarily in the closed male category B and C estate. This includes modern, purpose-built houseblocks which will provide improved living space for prisoners and a safer working environment for staff.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. Ongoing construction issues.","startDate":"2019-08-15","endDate":null,"scheduleNarrative":"Exempt under Section 22 of the Freedom of Information Act 2000 (Information intended for future publication)","fyBaseline":139.13,"fyForecast":98.99,"fyVariance":-29.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The underspend is due to delays stemming from challenging site conditions, requiring some costs to be re-profiled into future financial years.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":0.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 0m. This project currently reports no monetised benefits. Due to the projected increasing prisons population, this project focusses on increasing capacity and there are no monetised benefits to be claimed. The programme's other benefits are defined in the current baseline as: construction benefits and outcomes (capacity, modern methods of construction and sustainability); to enable an improvement in prisoner rehabilitation outcomes; and, during its construction, deliver local community benefits.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. Ongoing construction issues. Exempt under Section 22 of the Freedom of Information Act 2000 (Information intended for future publication)","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"MOJ_0113_2122-Q2","year":2025,"name":"10K Additional Prison Places Estate Expansion Houseblocks and Refurbishments","department":"MoJ","category":"Infrastructure and Construction","description":"The Houseblocks and Refurbishments Programme supports our 20,000 additional prison places commitment; its scope is to deliver around 2000 additional prison places, primarily in the closed male category B and C estate. This includes modern, purpose-built houseblocks which will provide improved living space for prisoners and a safer working environment for staff.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 decreased from AMBER to RED. This is primarily due to the following factors‚ The programme’s key supplier entered administration.","startDate":"2019-08-15","endDate":"2029-08-05","scheduleNarrative":"The project's end-date at 24/25-Q4 is scheduled to be 05/08/2029. This is primarily due to the following factors‚ The programme’s key supplier entered administration.","fyBaseline":78.1,"fyForecast":71.9,"fyVariance":7.94,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ This is due to delays stemming from supplier administration, requiring some costs to be re-profiled into future financial years.","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ This project currently reports no monetised benefits. Due to the projected increasing prisons population, this project focusses on increasing capacity and there are no monetised benefits to be claimed. The programme's other benefits are defined in the current baseline as: construction benefits and outcomes (capacity, modern methods of construction and sustainability); to enable an improvement in prisoner rehabilitation outcomes; and, during its construction, deliver local community benefits.","themes":["Commercial & supply chain","Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 decreased from AMBER to RED. This is primarily due to the following factors‚ The programme’s key supplier entered administration. The project's end-date at 24/25-Q4 is scheduled to be 05/08/2029. This is primarily due to the…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"MOJ_0113_2122-Q2","year":2026,"name":"10K Additional Prison Places Estate Expansion Houseblocks and Refurbishments","department":"MOJ","category":"Infrastructure and Construction","description":"The Houseblocks and Refurbishments Programme supports our 20,000 additional prison places commitment; its scope is to deliver around 2000 additional prison places, primarily in the closed male category B and C estate. This includes modern, purpose-built houseblocks which will provide improved living space for prisoners and a safer working environment for staff.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25-Q4, the NISTA Delivery Confidence Assessment (DCA) rating at 25/26-Q4 remains at Red. This is primarily due to the administration of a key supplier.","startDate":"2019-08-15","endDate":"2031-02-05","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 changed from 05/08/29 to 05/02/31. This is primarily due to delays emerging from a key delivery supplier entering into administration.","fyBaseline":58.47,"fyForecast":25.2,"fyVariance":56.9,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to supplier administration and the resulting effect on programme costs.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"This programme currently reports no monetised benefits. This programme focusses on increasing capacity and there are no monetised benefits to be claimed. The programme's other benefits are defined in the current baseline as: construction benefits and outcomes (capacity, modern methods of construction and sustainability); to enable an improvement in prisoner rehabilitation outcomes; and, during its construction, deliver local community benefits.​","themes":["Commercial & supply chain","Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 24/25-Q4, the NISTA Delivery Confidence Assessment (DCA) rating at 25/26-Q4 remains at Red. This is primarily due to the administration of a key supplier. Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 changed from 05/08/29 to 05/02/31. This is primarily due to delays emerging from a key delivery supplier…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"MOJ_0113_2122-Q2","year":2025,"name":"10K Additional Prison Places Estate Expansion Houseblocks and Refurbishments","department":"MoJ","category":"Infrastructure and Construction","description":"The Houseblocks and Refurbishments Programme supports our 20,000 additional prison places commitment; its scope is to deliver around 2000 additional prison places, primarily in the closed male category B and C estate. This includes modern, purpose-built houseblocks which will provide improved living space for prisoners and a safer working environment for staff.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 decreased from AMBER to RED. This is primarily due to the following factors‚ The programme’s key supplier entered administration.","startDate":"2019-08-15","endDate":"2029-08-05","scheduleNarrative":"The project's end-date at 24/25-Q4 is scheduled to be 05/08/2029. This is primarily due to the following factors‚ The programme’s key supplier entered administration.","fyBaseline":78.1,"fyForecast":71.9,"fyVariance":7.94,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ This is due to delays stemming from supplier administration, requiring some costs to be re-profiled into future financial years.","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ This project currently reports no monetised benefits. Due to the projected increasing prisons population, this project focusses on increasing capacity and there are no monetised benefits to be claimed. The programme's other benefits are defined in the current baseline as: construction benefits and outcomes (capacity, modern methods of construction and sustainability); to enable an improvement in prisoner rehabilitation outcomes; and, during its construction, deliver local community benefits.","themes":["Commercial & supply chain","Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 decreased from AMBER to RED. This is primarily due to the following factors‚ The programme’s key supplier entered administration. The project's end-date at 24/25-Q4 is scheduled to be 05/08/2029. This is primarily due to the…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":549,"attentionScore":70,"attentionReasons":["Current published delivery confidence is Red","Published end date moved 549 days later","In-year forecast variance is +56.9%"]},{"id":"MOD_0120_2021-Q2","year":2026,"name":"E7 WEDGETAIL","department":"MOD","category":"Military Capability","description":"The E-7 Wedgetail programme will provide a 5th generation Airborne Early Warning and Control (AEW and C) capability, with a Multi-role Electronically Scanned Array sensor, which is interoperable and interchangeable with key allies with an anticipated Out-of-Service date of at least 2042.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Red. This is primarily due to the following factors. 1. Several factors have caused delays to the Programme’s In-Service Date and subsequent milestones. 2. The delays are the result of contractor performance and schedule optimism bias, challenges within the global supply chain, retention of an appropriately skilled workforce at the modification facility and an increase in certification complexity and requirements.","startDate":"2018-05-08","endDate":"2030-07-01","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 31/12/2027. This is primarily due to the following factors. 1. Although the reported end date remains unchanged from Q4 24/25, milestones are being revised through a programme rebaselining exercise.","fyBaseline":133.12,"fyForecast":62.76,"fyVariance":52.85,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors: 1. The schedule delays in the Programme have led to a reprofiling of the in-year finances leading to a reduced spend this year compared to the budget.","wholeLifeCost":2128.05,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) decreased from £1962M to £1937M. This is primarily due to the following factors. 1. Updated estimate of costs following modelling of the latest price proposal.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Red. This is primarily due to the following factors. 1. Several factors have caused delays to the Programme’s In-Service Date and subsequent milestones. 2. The delays are the result of contractor performance and schedule optimism bias,…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"MOD_0120_2021-Q2","year":2021,"name":"E7 Wedgetail","department":"MOD","category":"Military Capability","description":"The E-7 Wedgetail programme will provide a 5th Generation Airborne Early Warning and Control capability, with an Electronically Scanned Array radar, that is interoperable and interchangeable with key allies to an anticipated Out-of-Service date of at least 2042. The intent of the E-7 Wedgetail programme is to recapitalise the UK Airborne Warning And Control System E-3D Fleet with a modern Airborne Early Warning and Control platform having a target In Service Date of 2023. It will provide an airborne surveillance and C2 capability that can meet environmental and regulatory changes. The Programme will deliver a capability that can meet NATO and Coalition Theatre Entry Standards, meet the UK's contribution-in-kind to the NATO Airborne Early Warning Force and be interoperable and interchangeable with key allies. It will also effectively communicate with and enable 4th, 5th and future Generation Assets in order to successfully compete and contest against near-peer adversaries. It has been confirmed that, with minor modifications (detailed in the Outline Business Case), the Boeing E-7 Wedgetail meets the Ministry Of Defences initial capability requirements and Key User Requirements.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 26 of the Freedom of Information Act 2000 (Defence)","startDate":"2018-05-08","endDate":"2026-06-30","scheduleNarrative":"The project end-date is 30 June 2026. This is primarily due to the following factors: The Wedgetail Programme is currently working through the implications of the 2021 Integrated Review. The programme remains on track to deliver an In Service Date of 2023, however, negotiations with the Prime Contractor are ongoing to optimise the schedule for a reduced fleet size and a change of Main Operating Base to RAF Lossiemouth.","fyBaseline":329.44,"fyForecast":352.82,"fyVariance":7.0,"varianceNarrative":"The budget variance exceeds 5%. Most significant reasons for variances are changes in foreign exchange rates during the year, and bring-forward of Financial Year 2021/22 costs due to some aspects of the programme being ahead of schedule (no overall change to programme costs).","wholeLifeCost":2245.67,"costNarrative":"The projects Baseline Whole Life Cost is �2245.67m. This is primarily due to the following factors: Original Whole Life Costs were estimated for the Outline Business Case based on Rough Order Magnitude data provided by Boeing, and were a factor in the investment decision to procure E-7 Wedgetail rather than upgrading the existing E-3D Sentry aircraft. This original figure is based on 5 aircraft based at RAF Waddington. In 2021 the project was re-baselined to deliver 3 aircraft based at RAF Lossiemouth, to achieve colocation synergies with the P8-A Poseidon fleet and provide a cost saving. Estimated Whole Life Costs for the reduced fleet size will be updated at Full Business Case in Q3 2022, when approval for the initial sustainment contract will be sought.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Commercial & supply chain"],"evidenceExcerpt":"Exempt under Section 26 of the Freedom of Information Act 2000 (Defence) The project end-date is 30 June 2026. This is primarily due to the following factors: The Wedgetail Programme is currently working through the implications of the 2021 Integrated Review. The programme remains on track to deliver an In Service Date of 2023, however, negotiations with…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21"},{"id":"MOD_0120_2021-Q2","year":2022,"name":"E7 Wedgetail","department":"MOD","category":"Military Capability","description":"The E-7 Wedgetail programme will provide a 5th generation Airborne Early Warning and Control capability, with a Multi-role Electronically Scanned Array radar, that is interoperable and interchangeable with key allies to an anticipated Out-of-Service date of at least 2042.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating increased from Amber/Red to Amber. This is primarily due to the following factors: The removal of the incremental Amber/Red and Amber/Green assessment ratings. The Defence in a Competitive Age Command Paper (CP411) published in March 2021 confirmed that the RAF would procure three aircraft and move the main operating base to RAF Lossiemouth. It has therefore been necessary to renegotiate terms with Boeing Defence (UK).","startDate":"2018-05-08","endDate":"2027-06-01","scheduleNarrative":"Compared to 2021-Q4, the project end-date increased from 30 June 26 to 1 June 27 This is primarily due to the following factors: Correction of published position in March 21. The programme continues to forecast an end date of 30 June 26. Work continues to finalise the programme schedule following the 2020 Integrated Defence Review decision.","fyBaseline":408.72,"fyForecast":446.69,"fyVariance":9.0,"varianceNarrative":"The budget variance exceeds 5%.The reason for this was the bring forward of costs from future years.","wholeLifeCost":1895.0,"costNarrative":"Compared to 2021-Q4, the projects Baseline Whole Life Cost has reduced by £351M (£2245.674M at Q4 20/21 and £1895.153M at Q4 21/22). This is primarily due to the following factors: The Defence in a Competitive Age Command Paper (CP411) published in March 2021 confirmed that the RAF would procure three aircraft.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating increased from Amber/Red to Amber. This is primarily due to the following factors: The removal of the incremental Amber/Red and Amber/Green assessment ratings. The Defence in a Competitive Age Command Paper (CP411) published in March 2021…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"MOD_0120_2021-Q2","year":2023,"name":"E7 Wedgetail","department":"MOD","category":"Military Capability","description":"The E-7 Wedgetail programme will provide a 5th generation Airborne Early Warning and Control capability, with a Multi-role Electronically Scanned Array radar that is interoperable and interchangeable with key allies to an anticipated Out-of-Service date of at least 2042.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber (SRO rating). This is primarily due to the following factors. The Wedgetail Programme is in the manufacture phase with all three aircraft in modification at STS Aviation (Birmingham). The first aircraft was fitted with its distinctive Multi-role Electronically Scanned Array sensor in September 2022. However, continued challenges within the global supply chain are preventing progress towards a Green rating.","startDate":"2018-05-08","endDate":"2027-06-01","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2027-06-01. This is primarily due to the following factors. The Wedgetail Programme is expected to reach Full Operating Capability in 2026, with the milestone date to be approved in the Full Business Case. As a result, the Programme end-date will be amended as refined by the Integrated Master Schedule.","fyBaseline":198.53,"fyForecast":205.1,"fyVariance":3.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":1877.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 decreased from 1895m. to 1877m. This is primarily due to the following factors. The final Programme estimate of Whole-Life Cost will be presented in the Full Business Case. The current Whole Life Cost has reduced due to the transfer of domestic infrastructure funding requirement to Air Infrastructure and the Lossiemouth Development Programme.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This programme does not report cashable benefits. Its aim is to provision the armed forces with the equipment and / or infrastructure required.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber (SRO rating). This is primarily due to the following factors. The Wedgetail Programme is in the manufacture phase with all three aircraft in modification at STS Aviation (Birmingham). The first aircraft was fitted with its distinctive Multi-role…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"MOD_0120_2021-Q2","year":2024,"name":"E7 Wedgetail","department":"MOD","category":"Military Capability","description":"The E-7 Wedgetail programme will provide a 5th generation Airborne Early Warning and Control (AEW and C) capability, with a Multi-role Electronically Scanned Array radar, that is interoperable and interchangeable with key allies to an anticipated Out-of-Service date of at least 2042.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure and Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 decreased from Amber to Red. This is primarily due to the following factors. There are affordability and equipment delivery schedule risks and issues. These will be addressed in the Full Business Case that is planned for submission to the Approving Authority in the first half of Financial Year 24/25.","startDate":"2018-05-08","endDate":"2027-06-01","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained scheduled to finish on 2027-06-01. This is primarily due to the following factors. Although unchanged from last year, the Programme’s scheduled end date is currently seeking revision as challenges within the global supply chain, retention of an appropriately skilled workforce at the modification facility and an increase in certification complexity in the aviation sector has caused delays to the In Service Date.","fyBaseline":247.51,"fyForecast":248.5,"fyVariance":0.4,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":2053.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 increased from 1877m to 2053m. This is primarily due to the following factors. The result of more budget being released to match the forecast costs of the Programme. The WLC figure presented at Q4 23/24 is within the current Approved Budgetary Level for the Programme which remains unchanged from Q4 22/23. The final WLC will be included in the Programme’s Full Business Case.","benefits":0.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 0m.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure and Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 decreased from Amber to Red. This is primarily due to the following factors. There are affordability and equipment delivery schedule risks and issues. These will be addressed in the Full Business Case that is planned for…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"MOD_0120_2021-Q2","year":2025,"name":"E7 WEDGETAIL","department":"MoD","category":"Military Capability","description":"The E-7 Wedgetail programme will provide a 5th generation Airborne Early Warning and Control (AEW and C) capability, with a Multi-role Electronically Scanned Array sensor, which is interoperable and interchangeable with key allies with an anticipated Out-of-Service date of at least 2042.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Project's Delivery Confidence Assessment rating at 24/25-Q4 is RED, compared with the Infrastructure and Projects Authority's assessment last year of RED. This is due to the following factors. Whilst a sufficient budget was issued to the SRO, the delay in obtaining final approval of the Full Business Case is impacting across several areas of the Programme, particularly the sustainment contract.","startDate":"2018-05-08","endDate":"2027-12-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 01/06/2027 to 31/12/2027. This is primarily due to the following factors. Challenges within the global supply chain, retention of an appropriately skilled workforce at the modification facility and an increase in certification complexity and requirements has caused delays to the In-Service Date and subsequent milestones. As the aircraft completes its modification, the certification schedule is emerging as the critical path.","fyBaseline":183.33,"fyForecast":86.95,"fyVariance":52.57,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. Defence financial challenges and internal spend commitment controls have led to a different spend profile to that initially envisaged.","wholeLifeCost":1962.75,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 2053 to 1962. This is primarily due to the following factors. This is primarily as a consequence of programme contextual changes in the aircraft acquisition contract.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Approvals & decisions"],"evidenceExcerpt":"The Project's Delivery Confidence Assessment rating at 24/25-Q4 is RED, compared with the Infrastructure and Projects Authority's assessment last year of RED. This is due to the following factors. Whilst a sufficient budget was issued to the SRO, the delay in obtaining final approval of the Full Business Case is impacting across several areas of the…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"MOD_0120_2021-Q2","year":2026,"name":"E7 WEDGETAIL","department":"MOD","category":"Military Capability","description":"The E-7 Wedgetail programme will provide a 5th generation Airborne Early Warning and Control (AEW and C) capability, with a Multi-role Electronically Scanned Array sensor, which is interoperable and interchangeable with key allies with an anticipated Out-of-Service date of at least 2042.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Red. This is primarily due to the following factors. 1. Several factors have caused delays to the Programme’s In-Service Date and subsequent milestones. 2. The delays are the result of contractor performance and schedule optimism bias, challenges within the global supply chain, retention of an appropriately skilled workforce at the modification facility and an increase in certification complexity and requirements.","startDate":"2018-05-08","endDate":"2030-07-01","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 31/12/2027. This is primarily due to the following factors. 1. Although the reported end date remains unchanged from Q4 24/25, milestones are being revised through a programme rebaselining exercise.","fyBaseline":133.12,"fyForecast":62.76,"fyVariance":52.85,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors: 1. The schedule delays in the Programme have led to a reprofiling of the in-year finances leading to a reduced spend this year compared to the budget.","wholeLifeCost":2128.05,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) decreased from £1962M to £1937M. This is primarily due to the following factors. 1. Updated estimate of costs following modelling of the latest price proposal.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Red. This is primarily due to the following factors. 1. Several factors have caused delays to the Programme’s In-Service Date and subsequent milestones. 2. The delays are the result of contractor performance and schedule optimism bias,…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"MOD_0120_2021-Q2","year":2025,"name":"E7 WEDGETAIL","department":"MoD","category":"Military Capability","description":"The E-7 Wedgetail programme will provide a 5th generation Airborne Early Warning and Control (AEW and C) capability, with a Multi-role Electronically Scanned Array sensor, which is interoperable and interchangeable with key allies with an anticipated Out-of-Service date of at least 2042.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Project's Delivery Confidence Assessment rating at 24/25-Q4 is RED, compared with the Infrastructure and Projects Authority's assessment last year of RED. This is due to the following factors. Whilst a sufficient budget was issued to the SRO, the delay in obtaining final approval of the Full Business Case is impacting across several areas of the Programme, particularly the sustainment contract.","startDate":"2018-05-08","endDate":"2027-12-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 01/06/2027 to 31/12/2027. This is primarily due to the following factors. Challenges within the global supply chain, retention of an appropriately skilled workforce at the modification facility and an increase in certification complexity and requirements has caused delays to the In-Service Date and subsequent milestones. As the aircraft completes its modification, the certification schedule is emerging as the critical path.","fyBaseline":183.33,"fyForecast":86.95,"fyVariance":52.57,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. Defence financial challenges and internal spend commitment controls have led to a different spend profile to that initially envisaged.","wholeLifeCost":1962.75,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 2053 to 1962. This is primarily due to the following factors. This is primarily as a consequence of programme contextual changes in the aircraft acquisition contract.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Approvals & decisions"],"evidenceExcerpt":"The Project's Delivery Confidence Assessment rating at 24/25-Q4 is RED, compared with the Infrastructure and Projects Authority's assessment last year of RED. This is due to the following factors. Whilst a sufficient budget was issued to the SRO, the delay in obtaining final approval of the Full Business Case is impacting across several areas of the…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":913,"attentionScore":70,"attentionReasons":["Current published delivery confidence is Red","Published end date moved 913 days later","In-year forecast variance is +52.9%"]},{"id":"MOD_0091_1415-Q3","year":2026,"name":"ARMOURED CAVALRY 2025","department":"MOD","category":"Military Capability","description":"The Armoured Cavalry Programme is central to the Army’s Integrated Review and Future Soldier. It will deliver a multi-role Ground Mounted Crewed Reconnaissance capability, centred on the Ajax family of vehicles and their training and support systems, into service with the British Army. The six Ajax variants deliver a step change in capability compared to current in-service vehicles in the areas of Intelligence, Surveillance, Target Acquisition & Reconnaissance (ISTAR) sensors, multi-domain integration, lethality, protection, and mobility. 589 vehicles will be delivered through a firm-price contract with General Dynamics Land Systems (United Kingdom).","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 decreased to Red. This is primarily due to the following factors. 1. The programme remains on pause following issues identified during Exercise TITAN STORM, which led to a halt in vehicle acceptance and delivery activities from December 2025. 2. The current pause has delayed the completion of the Demonstration phase and it is likely that a re-approval will be required post a Ministerial decision regarding the future of the programme.","startDate":"2014-12-04","endDate":"2030-03-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remains unchanged 31/03/2030. This is primarily due to the following factors.","fyBaseline":365.34,"fyForecast":278.1,"fyVariance":23.88,"varianceNarrative":"The in-year varience exceeds 5%. This is primarily due to the following factors. 1. £40M CDEL was due to lack of Contract Change Proposal progress. The impact of the stop notice has caused additional reductions of c.£44M CDEL related to acceptance of vehicles and knock-on effect to vehicle production. 2. The RDEL variance is caused by a much lower demand for spares against the GD spares availability service requiring a DEL switch from CDEL to RDEL to apply the correct accounting treatment. There is no increase in the programme value as these reductions have been re-profiled into future years.","wholeLifeCost":8935.68,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) decreased from £7505.71M to £7470.12M This is primarily due to the following factors. 1. There are no significant changes to the budgeted Whole Life Costs of the programme. Due to the bulk of costs linked to the firm price contract with GD, variances presented in-year are related to reprofiling and therefore no overall impact on the programme. 2. The Armoured Cavalry Programme Approved Budgetary Limit has remained unchanged since 2015.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. There are no monetised benefits.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 decreased to Red. This is primarily due to the following factors. 1. The programme remains on pause following issues identified during Exercise TITAN STORM, which led to a halt in vehicle acceptance and delivery activities from December 2025. 2. The…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"MOD_0091_1415-Q3","year":2020,"name":"Armoured Cavalry 2025","department":"MOD","category":"Military Capability","description":"To deliver an integrated multi-role capability that will include the delivery of the AJAX armoured fighting vehicle and its training solution into service.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber, which has not changed since last year�s Q2 1819 Amber, due primarily to the following factors; - The schedule remained stable between Q2 18/19 and Q2 19/20. - General Dynamics maintained their commitment to deliver the project during a recast of the contract in 2018. Since the Q2 1920 (30th September 2019) Amber IPA DCA, the following non-project operating environment activities have impacted the original Q2 IPA DCA; - COVID-19 has caused some short-term delays. The manufacture and acceptance of AJAX vehicles has been delayed by COVID-19 control measures. Since the Q2 1920 (30th September 2019) Amber IPA DCA, the following primary project actions have impacted the original Q2 IPA DCA; - An issue has come to light that could affect the safety operating clearance of AJAX's turret. Remedial engineering work to rectify the issue is causing some delay. - General Dynamics have been late to deliver appropriate safety cases for the AJAX vehicles, delaying the delivery of vehicles to the Army.","startDate":"2014-12-04","endDate":"2025-04-30","scheduleNarrative":"The scheduled baseline project end date at Q2 1920 (30th September 2019) is 30/04/25, has not changed since last year's Q2 1819 date of 30/04/25, due primarily to the following factors; - General Dynamics maintained their commitment to deliver the project during a recast of the contract in 2018. - The schedule remained stable between Q2 18/19 and Q2 19/20. Since the Q2 1920 (30th September 2019) baseline project end date of 30/04/25, the following non-project operating environment activities have impacted the original Q2 baseline project end date; - Delays to trials due to COVID-19 may affect the project end date although the impact is still being assessed. Since the Q2 1920 (30th September 2019) baseline project end date of 30/04/25, the following primary project actions have impacted the original Q2 baseline project end date; - The schedule to the project end date is being reassessed in light of General Dynamics' delay to deliver vehicles in line with the contract. At the moment there is no forecast change to the end date but there is an increased risk that it will be delayed. - An issue has come to light that could affect the safety operating clearance of AJAX's turret. Remedial engineering work to rectify the issue is causing some delay. This delay should not affect the end date of the project although the full impact is still being assessed.","fyBaseline":694.71,"fyForecast":643.0,"fyVariance":-7.0,"varianceNarrative":"The 19/20 in-year baseline / forecast variance at Q2 1920 (30th September 2019) of -7%, is due primarily to the following factors; - Reduction in AJAX support due to decreased vehicles being fielded from prime production contract. This meant a reduction in CLS forecast, inability to complete �BATUS� support milestone and reduction in planned levels of Capital spares due to inability to agree range, scaling and price of spares required. - Reduction in Infrastructure costs supporting AJAX programme as a result of reprofiling on sub projects projects which didn�t progress as quickly as expected. Since the Q2 1920 (30th September 2019) 19/20 in-year baseline / forecast variance of -7%, the following primary project actions have impacted the original Q2 19/20 in-year variance; - Reprofiling of expenditure between years and minimal variances to the overall AJAX Demonstration & Manufacture and Support forecasts will have occurred as a result of changes to programme timescales.","wholeLifeCost":6288.95,"costNarrative":"The baseline Whole Life Cost at Q2 1920 (30th September 2019) is �6,288.95 m, has decreased by �2.99 m since last year's Q2 1819 (�m) baseline Whole Life Cost of �6,291.94 m, due primarily to the following factors; - The primary reason for movement in AJAX WLC relates to reduced initial activities required to support the In-service AJAX vehicles. A years� worth of support costs would have been incurred between Q21819 and Q21920 and further certainty on the number/timing of vehicles being fielded into service from the prime production contract would be understood - this is now reduced so would shape revision of support costs. Since the Q2 1920 (30th September 2019) �6,288.95 m baseline Whole Life Cost, the following non-project operating environment activities have impacted the original baseline Q2 Whole Life Cost; - COVID-19 has caused some short-term delays. As the Prime Manufacturing and Support contract with GDUK is a firm price contract, there will be minimal affect on WLC if activity is moved into later months/years. Since the Q2 1920 (30th September 2019) �6,288.95 m baseline Whole Life Cost, the following primary project actions have impacted the original Q2 baseline Whole Life Cost; - No significant project actions have materially affected WLC. Reprofiling of expenditure between years and minimal variances to the overall AJAX Demonstration & Manufacture and Support forecasts will have occurred as a result of changes to programme timescales.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Technical & integration"],"evidenceExcerpt":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber, which has not changed since last year�s Q2 1819 Amber, due primarily to the following factors; - The schedule remained stable between Q2 18/19 and Q2 19/20. - General Dynamics maintained their commitment to deliver the project during a recast of the contract in…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2020","sourceLabel":"IPA Annual Report 2019-20"},{"id":"MOD_0091_1415-Q3","year":2021,"name":"Armoured Cavalry 2025","department":"MOD","category":"Military Capability","description":"Ajax forms part of the Armoured Cavalry 2025 Programme. The aim of the programme is to deliver by 2025, a versatile and agile multi-role capability, operating at the heart of the Deep Reconnaissance Strike and Heavy Combat Brigades, that are able to succeed on current and future operations in the most complex and demanding operational environments. The multi-role Ajax armoured fighting vehicle will transform the Army's advanced intelligence, surveillance, target acquisition and reconnaissance capability as part of the war-fighting division. It will transform the way the Army conducts Deep Ground Reconnaissance and underpins the Army's ability to war fight at the divisional level through the Heavy Brigade Combat Teams. Each Ajax has extensive capabilities, including increased lethality through automated detection systems, a 40mm stabilised cannon able to fire on the move, acoustic detectors, a laser warning system, a local situational awareness system, a high-performance power pack, and best in class protection.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating increased from Amber to Red. This is primarily due to the following factors: The Senior Responsible Owner has adjusted the delivery confidence to Red overall. Delivery schedule delay of the Army's first vehicles meant that the Approved Initial Operating Capability baseline of July 20 was no longer achievable. This was reset to Jun 21 (Probability 50%) and Sep 21 (Probability 90%). In March 21 the Senior Responsible Owner commissioned an independent Gateway Review of the programme. This assessed the impact of late discovery technical issues during the demonstration phase of the project and the further work necessary to overcome them. It also identified a number of additional interventions necessary to de-risk the schedule to Full Operating Capability. The principle reasons for the delay experienced included a degree of optimism bias in the schedule for a new generation of armoured fighting vehicle, the technical challenges faced and evidence to support safety case generation, COVID-19 and delivery performance. A detailed action plan has been initiated to rectify the issues identified and all Full Operating Capability assumptions are being re-tested as part of this ongoing activity. Concurrently, all Initial Operating Capability vehicles have now been manufactured. Advanced First of Type training simulators have been delivered and the training of the Army's own Instructors on the ARES vehicle has commenced. The underlying technical issues now being worked through will be comprehensively addressed prior to declaration of the Ajax Initial Operating Capability.","startDate":"2014-01-22","endDate":"2025-04-30","scheduleNarrative":"Compared to financial year 19/20-Q2, the project's end-date remained scheduled to finish on 30 April 2025 . This is primarily due to the following factors: Work is ongoing to test the Full Operating Capability forecast date and any update will be published in due course.","fyBaseline":819.03,"fyForecast":634.37,"fyVariance":-23.0,"varianceNarrative":"The budget variance exceeds 5%. Reduction in forecast spend against financial year 20/21 Control Total is driven primarily by delays experienced in the manufacturing side of the programme with activity in the following areas re-profiled into future years: Delivery of fully built vehicles, Delivery of Peacetime and Military Combat Armour Kits for AJAX vehicles, Retrofit programme of work to uplift Drop 1 standard vehicles to Drop 3 standard build configuration. Turret integration work to assemble CTC 40mm Cannon to AJAX Turret. In relation to In Service Support, In service spares weren't ordered/delivered in line with assumed levels, seeing a reduction in year and reprofile of costs into future years.","wholeLifeCost":6353.94,"costNarrative":"Compared to financial year 19/20-Q2, the projects Baseline Whole Life Cost increased from �6288.95m to �6353.94m. This is primarily due to the following factors: The Whole Life Budgets in relation to AJAX are associated with the completion of Demonstration and Manufacture activities within the programme, resulting in the delivery of 589 AJAX vehicles. The Budgets also include In Service Support until 2025, which is primarily delivered through the contracted General Dynamics UK support solution. This element delivers a support framework and purchase of spares to support in service vehicles. Although the Baseline Forecast Budget from Q2 19/20 �6288.953m to Q4 20/21 �6353.940m appears to increase by �64.987 this is because historic budgets are not adjusted as Programme costs and budgets are rolled forward into future years. The Whole Life Budget c.�6.4Bn currently covers the period up to the end of Manufacture as per the Main Gate approval. The Whole Life Costs from Q2 19/20 �6143.994m to Q4 20/21 �6005.698m have actually reduced by �138.296m. Whole Life Cost reductions were driven by removal of the Fire, Support and Overwatch requirement from the Demonstration work within the AJAX programme. Also efficiencies were realised in the In Service Support costings where modelling identified further coverage from current contract arrangement (across spares and Contractor Logistic Support) this then enabled a costing reduction.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Workforce & capability","Technical & integration"],"evidenceExcerpt":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating increased from Amber to Red. This is primarily due to the following factors: The Senior Responsible Owner has adjusted the delivery confidence to Red overall. Delivery schedule delay of the Army's first vehicles meant that the Approved Initial…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21"},{"id":"MOD_0091_1415-Q3","year":2022,"name":"Armoured Cavalry 2025","department":"MOD","category":"Military Capability","description":"The Armoured Cavalry programme is central to the Army's Integrated Review and Future Soldier. It will deliver a multi-role Ground Mounted Reconnaissance capability, centred on the Ajax family of vehicles and their training and support systems, into service with the British Army. The six Ajax variants deliver a step change in capabilities compared to current in-service vehicles in the areas of Intelligence, Surveillance, Target Acquisition and Reconnaissance sensors, multi-domain integration, lethality, protection and mobility. Ajax will equip units in both Armour and Deep Reconnaissance and Strike Brigade Combat Teams in 3rd (United Kingdom) Division. 589 vehicles will be delivered through a firm priced contract with General Dynamics Land Systems (United Kingdom).","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Red. This is primarily due to the following factors: The Armoured Cavalry Programme is operating out of time, but within financial approval. There are technical issues with the Ajax platforms, for which design modifications have been identified. These are currently being trialled to assess their efficacy and Field Army use of the delivered vehicles is on hold until MOD is assured of their success. The impact of noise and vibration upon the overall programme schedule to Full Operating Capability has been significant. Significant effort is underway between the Army, DE&S and GDLS-UK to produce a jointly agreed, risk adjusted reset schedule, which is required to assure the programme and to provide confidence in deliverability, compliance and value for money.","startDate":"2014-01-22","endDate":"2025-04-30","scheduleNarrative":"Compared to 2021-Q4, the project end-date remained scheduled to finish on 30 April 2025 however, there is risk to this date. This is primarily due to the following factors: The time required to quantify, understand and address the issues of noise and vibration has had a significant impact upon all areas of the programme, but most particularly upon the already delayed Ajax production schedule. A jointly agreed, risk adjusted reset schedule is necessary to identify the impact to Full Operating Capability.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests)","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests)","benefits":null,"benefitsNarrative":"","themes":["Delivery & schedule","Scope & requirements","Commercial & supply chain","Cost & funding"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Red. This is primarily due to the following factors: The Armoured Cavalry Programme is operating out of time, but within financial approval. There are technical issues with the Ajax platforms, for which design modifications have been…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"MOD_0091_1415-Q3","year":2023,"name":"Armoured Cavalry 2025","department":"MOD","category":"Military Capability","description":"The Armoured Cavalry programme is central to the Army's Integrated Review and Future Soldier. It will deliver a multi-role Ground Mounted Reconnaissance capability, centred on the Ajax family of vehicles and their training and support systems, into service with the British Army. The six Ajax variants deliver a step change in capabilities compared to current in-service vehicles in the areas of Intelligence, Surveillance, Target Acquisition and Reconnaissance sensors, multi-domain integration, lethality, protection, and mobility. Ajax will equip units in both Armour and Deep Reconnaissance Strike Brigade Combat Teams in 3rd (United Kingdom) Division. 589 vehicles will be delivered through a firm-price contract with General Dynamics Land Systems (United Kingdom).","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 increased from Red to Amber. This is primarily due to the following factors. The impact of noise and vibration upon the overall programme schedule to Full Operating Capability has been significant. Significant effort has been made between the Army, Defence Equipment and Support and General Dynamics Land Systems UK to produce a jointly agreed, risk adjusted schedule. This is being used to reset programme approvals against increased confidence in deliverability, compliance, and value for money.","startDate":"2014-01-22","endDate":"2030-03-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 increased from 2025-04-30 to 2030-03-31. This is primarily due to the following factors. The time required to quantify, understand, and address the issues of Noise and Vibration has had a significant impact upon all areas of the programme, but most particularly upon the already delayed Ajax production schedule. A jointly agreed, risk adjusted reset schedule is in place out to Full Operating Capability.","fyBaseline":458.44,"fyForecast":325.55,"fyVariance":-29.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors: Delays in achieving an agreed Drop 3 Standard and the associated impact upon the vehicle build schedule. Turret Deliveries were also reduced in line with production causing a further underspend. The remaining in-year variance is split across Demonstration Phase Activities due to Noise and Vibration issues as well as Training Systems procurement; removal of Fire Support Overwatch assessment work and In-Service activities.","wholeLifeCost":6854.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 22/23-Q4 is 6854m. This is primarily due to the following factors. Re-profiling from earlier years and inflation, inclusion of contract change proposal assessments, potential requirement changes and an increase in raw materials and consumables.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This programme does not report cashable benefits. Its aim is to provision the armed forces with the equipment and / or infrastructure required.","themes":["Delivery & schedule","Cost & funding","Commercial & supply chain","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 increased from Red to Amber. This is primarily due to the following factors. The impact of noise and vibration upon the overall programme schedule to Full Operating Capability has been significant. Significant effort has been made…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"MOD_0091_1415-Q3","year":2024,"name":"Armoured Cavalry 2025","department":"MOD","category":"Military Capability","description":"The Armoured Cavalry programme is central to the Army’s Integrated Review and Future Soldier. It will deliver a multi-role Ground Mounted Reconnaissance capability, centred on the Ajax family of vehicles and their training and support systems, into service with the British Army. The six Ajax variants will deliver a step change in capabilities compared to current in-service vehicles in the areas of Intelligence, Surveillance, Target Acquisition and Reconnaissance sensors, multi-domain integration, lethality, protection, and mobility. Ajax will equip units in both Armour and Deep Reconnaissance Strike Brigade Combat Teams in 3rd (United Kingdom) Division. 589 vehicles will be delivered through a firm-price contract with General Dynamics Land Systems (United Kingdom).","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure and Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The impact of noise and vibration upon the overall programme schedule to Full Operating Capability has been substantial. Significant effort has been made between the Army, DE&S and General Dynamics Land Systems UK (GDLS-UK) to produce a jointly agreed, risk adjusted schedule, which is being progressed to reset programme approvals against increased confidence in deliverability, compliance, and value for money.","startDate":"2014-12-04","endDate":"2025-04-30","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained scheduled to finish on 2025-04-30. This is primarily due to the following factors. A jointly agreed, risk adjusted reset schedule is in place out to Full Operating Capability; the programme is operating to this pending formal approval of the schedule by the department and HM Treasury.","fyBaseline":314.42,"fyForecast":231.33,"fyVariance":-26.426,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The in-year variance (circa 83m underspent) is mainly due to the transition to the revised General Dynamic Land Systems (UK) (GD) Milestone Payment Plan that incentivises vehicle delivery and so moves 57m out of the current FY and in to future years. The remaining 26m reduction is driven by a slower ramp-up of Capability Drop 3 Production and Retrofit activities that was originally assumed. GD are currently operating 2 production lines and are working to resolve labour and supply chain issues that will enable them to expand to 4 production lines as planned.","wholeLifeCost":6979.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 increased from 6854m to 6979m. This is primarily due to the following factors. Most of the cost variances experienced over the past 12 months are re-profiling activity that affect the timing of costs rather than increases/decreases to the Whole Life Cost (WLC) total. For this reason there will have only been minor WLC changes (c.30m). The figure in the Budget WLC field reflects a 10yr budget figure, not the total WLC.","benefits":0.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 0m.","themes":["Cost & funding","Delivery & schedule","Workforce & capability","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure and Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The impact of noise and vibration upon the overall programme schedule to Full Operating Capability has been substantial. Significant effort has been made between…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"MOD_0091_1415-Q3","year":2025,"name":"ARMOURED CAVALRY 2025","department":"MoD","category":"Military Capability","description":"The Armoured Cavalry Programme is central to the Army’s Integrated Review and Future Soldier. It will deliver a multi-role Ground Mounted Crewed Reconnaissance capability, centred on the Ajax family of vehicles and their training and support systems, into service with the British Army. The six Ajax variants deliver a step change in capabilities Compared to current in-service vehicles in the areas of Intelligence, Surveillance, Target Acquisition & Reconnaissance (ISTAR) sensors, multi-domain integration, lethality, protection, and mobility. 589 vehicles will be delivered through a firm-price contract with General Dynamics Land Systems (United Kingdom).","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Project's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER, compared with the Infrastructure and Projects Authority's assessment last year of AMBER. This is due to the following factors. The programme received an Amber rating at NISTA's 2024 Assurance Review. Although the impact of delays to trials and manufacture has been significant for the programme as a whole, the programme is and has been operating within its approvals since December 2022. Substantial effort has been made between the Army, Delivery Equipment and Support teams (DE and S) and GDLS-UK to maintain a joint and collaborative approach to all decisions and throughout the layers of programme management across organisations.","startDate":"2014-01-22","endDate":"2030-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 30/04/2025 to 31/03/2030. This is primarily due to the following factors. The jointly agreed, risk adjusted schedule is in place and planned out to Programme Closure (including a task breakdown of the Full Operating Capability milestone). The programme is operating within its current approval.","fyBaseline":334.65,"fyForecast":250.38,"fyVariance":25.18,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The in-year variance (circa -£83M) reflects a reprofiling of vehicle production and delivery as well as the associated payment milestones. There is no increase in the programme value as this is simply a reprofiling. Vehicle delivery meets the demand of the Army unit fielding plan and the Initial Operating Capability milestone. Vehicle deliveries are steadily increasing in each quarter.","wholeLifeCost":7505.71,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 6979 to 7505. This is primarily due to the following factors. The Armoured Cavalry programme's departmental-agreed Whole Life Cost* has increased. This is due to the way the Army forecasts Whole Life Costs. This should not be confused with the Armoured Cavalry Programme Approved Budgetary Limit which remains unchanged since 2015.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Workforce & capability"],"evidenceExcerpt":"The Project's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER, compared with the Infrastructure and Projects Authority's assessment last year of AMBER. This is due to the following factors. The programme received an Amber rating at NISTA's 2024 Assurance Review. Although the impact of delays to trials and manufacture has been significant for the…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"MOD_0091_1415-Q3","year":2026,"name":"ARMOURED CAVALRY 2025","department":"MOD","category":"Military Capability","description":"The Armoured Cavalry Programme is central to the Army’s Integrated Review and Future Soldier. It will deliver a multi-role Ground Mounted Crewed Reconnaissance capability, centred on the Ajax family of vehicles and their training and support systems, into service with the British Army. The six Ajax variants deliver a step change in capability compared to current in-service vehicles in the areas of Intelligence, Surveillance, Target Acquisition & Reconnaissance (ISTAR) sensors, multi-domain integration, lethality, protection, and mobility. 589 vehicles will be delivered through a firm-price contract with General Dynamics Land Systems (United Kingdom).","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 decreased to Red. This is primarily due to the following factors. 1. The programme remains on pause following issues identified during Exercise TITAN STORM, which led to a halt in vehicle acceptance and delivery activities from December 2025. 2. The current pause has delayed the completion of the Demonstration phase and it is likely that a re-approval will be required post a Ministerial decision regarding the future of the programme.","startDate":"2014-12-04","endDate":"2030-03-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remains unchanged 31/03/2030. This is primarily due to the following factors.","fyBaseline":365.34,"fyForecast":278.1,"fyVariance":23.88,"varianceNarrative":"The in-year varience exceeds 5%. This is primarily due to the following factors. 1. £40M CDEL was due to lack of Contract Change Proposal progress. The impact of the stop notice has caused additional reductions of c.£44M CDEL related to acceptance of vehicles and knock-on effect to vehicle production. 2. The RDEL variance is caused by a much lower demand for spares against the GD spares availability service requiring a DEL switch from CDEL to RDEL to apply the correct accounting treatment. There is no increase in the programme value as these reductions have been re-profiled into future years.","wholeLifeCost":8935.68,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) decreased from £7505.71M to £7470.12M This is primarily due to the following factors. 1. There are no significant changes to the budgeted Whole Life Costs of the programme. Due to the bulk of costs linked to the firm price contract with GD, variances presented in-year are related to reprofiling and therefore no overall impact on the programme. 2. The Armoured Cavalry Programme Approved Budgetary Limit has remained unchanged since 2015.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. There are no monetised benefits.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 decreased to Red. This is primarily due to the following factors. 1. The programme remains on pause following issues identified during Exercise TITAN STORM, which led to a halt in vehicle acceptance and delivery activities from December 2025. 2. The…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"MOD_0091_1415-Q3","year":2025,"name":"ARMOURED CAVALRY 2025","department":"MoD","category":"Military Capability","description":"The Armoured Cavalry Programme is central to the Army’s Integrated Review and Future Soldier. It will deliver a multi-role Ground Mounted Crewed Reconnaissance capability, centred on the Ajax family of vehicles and their training and support systems, into service with the British Army. The six Ajax variants deliver a step change in capabilities Compared to current in-service vehicles in the areas of Intelligence, Surveillance, Target Acquisition & Reconnaissance (ISTAR) sensors, multi-domain integration, lethality, protection, and mobility. 589 vehicles will be delivered through a firm-price contract with General Dynamics Land Systems (United Kingdom).","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Project's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER, compared with the Infrastructure and Projects Authority's assessment last year of AMBER. This is due to the following factors. The programme received an Amber rating at NISTA's 2024 Assurance Review. Although the impact of delays to trials and manufacture has been significant for the programme as a whole, the programme is and has been operating within its approvals since December 2022. Substantial effort has been made between the Army, Delivery Equipment and Support teams (DE and S) and GDLS-UK to maintain a joint and collaborative approach to all decisions and throughout the layers of programme management across organisations.","startDate":"2014-01-22","endDate":"2030-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 30/04/2025 to 31/03/2030. This is primarily due to the following factors. The jointly agreed, risk adjusted schedule is in place and planned out to Programme Closure (including a task breakdown of the Full Operating Capability milestone). The programme is operating within its current approval.","fyBaseline":334.65,"fyForecast":250.38,"fyVariance":25.18,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The in-year variance (circa -£83M) reflects a reprofiling of vehicle production and delivery as well as the associated payment milestones. There is no increase in the programme value as this is simply a reprofiling. Vehicle delivery meets the demand of the Army unit fielding plan and the Initial Operating Capability milestone. Vehicle deliveries are steadily increasing in each quarter.","wholeLifeCost":7505.71,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 6979 to 7505. This is primarily due to the following factors. The Armoured Cavalry programme's departmental-agreed Whole Life Cost* has increased. This is due to the way the Army forecasts Whole Life Costs. This should not be confused with the Armoured Cavalry Programme Approved Budgetary Limit which remains unchanged since 2015.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Workforce & capability"],"evidenceExcerpt":"The Project's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER, compared with the Infrastructure and Projects Authority's assessment last year of AMBER. This is due to the following factors. The programme received an Amber rating at NISTA's 2024 Assurance Review. Although the impact of delays to trials and manufacture has been significant for the…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":1,"transition":"Worsened","endDateDeltaDays":0,"attentionScore":68,"attentionReasons":["Current published delivery confidence is Red","Published rating worsened from Amber to Red","In-year forecast variance is +23.9%"]},{"id":"MOD_0126_2021-Q4","year":2026,"name":"NEXT GENERATION (FIXED) COMMUNICATION NETWORK","department":"MOD","category":"Information and Communications Technology (ICT)","description":"The intent of the Next Generation Communications Network Programme is to evolve the existing service into a single logical consolidated enterprise network capability which is coherently architected. Addresses the current security and resilience concerns and drives greater value for money by transforming the MOD Core Network against agreed acceptance quality criteria to enable the closure of Defence Fixed Telecommunications Service legacy, whilst preparing for the future by procuring suppliers to take-on and continue transforming the enhanced core network with an under-pinning operating model which enables continuous improvement in business as usual. This is critical to Defence operations and maintaining strategic advantage; as the enhanced service is the foundation of the Digital Backbone.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 decreased to Red. This is primarily due to the following factors, an independent assurance review conducted in March 2026 rated the Programme as red due to the scheduled forecast at time of review reporting completion beyond the allocated funding to the Programme. Baseline reviews by the programme to revaluate and refine the delivery plans were ongoing at the time of the assurance review. An improved schedule has now been developed and will be assessed by the Review Team when they return to reassess progress performance in Q1 26/27 where an improvement to delivery confidence is anticipated.","startDate":"2021-04-28","endDate":"2030-03-25","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 decreased from 11/12/2030 to 30/08/2030. This is primarily due to the following factors. 1. Changes to the Programme approach to two key programmes on the critical path which has matured to remove some dependencies to enable greater concurrency of activity. 2. The programme schedule has matured with clear end states defined and success criteria to monitor the performance of the delivery being developed. 3. The delivery schedule is governed through monthly programme boards, quarterly Programme Boards and quarterly senior Defence reviews.","fyBaseline":22.0,"fyForecast":22.0,"fyVariance":22.0,"varianceNarrative":"Exempt under Section 22 – Information intended for future publication ​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4; the project's Departmental-agreed monetised benefits at 25/26-Q4 remained at £0m","themes":["Delivery & schedule","Governance & assurance","Cost & funding","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 decreased to Red. This is primarily due to the following factors, an independent assurance review conducted in March 2026 rated the Programme as red due to the scheduled forecast at time of review reporting completion beyond the allocated funding to…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"MOD_0126_2021-Q4","year":2021,"name":"Next Generation Communications Network","department":"MOD","category":"ICT","description":"The Next Generation Communications Network� programme is responsible for delivering the Ministry of Defences's future network in support of the Digital Backbone as well as ensuring that the Ministry of Defences's fixed network continues to function to agreed standards of resilience and performance during the bridging period until the Programme delivers its replacement services and solutions.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber/Green.This is primarily due to the following factors: The Next Generation Communications Network programme is currently in the Concept Phase and it's Strategic Outline Case Outletter was received in April 2021. The programme team will be submitting a detailed Outline Business Case�in October 2021 that will lay out firm objectives, and evidenced views on choices, preferred options, commercial strategy, costs and scope.","startDate":"2021-03-31","endDate":"2031-03-31","scheduleNarrative":"The project end-date is 31 March 2031. This is primarily due to the following factors: The Next Generation Communications Network programme is currently in the Concept Phase and it's Strategic Outline Case� Outletter was received in April 2021. The programme team will be submitting a detailed Outline Business Case�in October 2021 that will lay out firm objectives, and evidenced views on the programmes choices, preferred options, commercial strategy, costs and scope.","fyBaseline":0.0,"fyForecast":0.0,"fyVariance":null,"varianceNarrative":"The Next Generation Communications Network programme is currently in the Concept Phase and it's Strategic Outline Case�Outletter was received in April 2021. The programme team will be submitting a detailed Outline Business Case� in October 2021 that will lay out firm objectives, and evidenced views on the programmes choices, preferred options, commercial strategy, costs and scope. Therefore no cost data present at this stage.","wholeLifeCost":0.0,"costNarrative":"The Next Generation Communications Network programme is currently in the Concept Phase and it's Strategic Outline Case�Outletter was received in April 2021. The programme team will be submitting a detailed Outline Business Case�in October 2021 that will lay out firm objectives, and evidenced views on the programmes choices, preferred options, commercial strategy, costs and scope. Therefore no whole life cost data at this stage.","benefits":null,"benefitsNarrative":"","themes":["Approvals & decisions","Commercial & supply chain","Scope & requirements","Cost & funding"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber/Green.This is primarily due to the following factors: The Next Generation Communications Network programme is currently in the Concept Phase and it's Strategic Outline Case Outletter was received in April 2021. The programme team will be submitting a detailed Outline…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21"},{"id":"MOD_0126_2021-Q4","year":2022,"name":"Next Generation (fixed) Communication Network","department":"MOD","category":"ICT","description":"Next Generation Connectivity Network is a 10 year programme to update and simplify the Ministry of Defence's core Network. The Next Generation Communication Network Programme is responsible for delivering the Ministry of Defence's future network in support of the Digital Backbone as well as ensuring that the Ministry of Defence's fixed network continues to function to agreed standards of resilience and performance during the bridging period until the programme delivers its replacement services and solutions.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating decreased from Amber/Green to Amber. This is primarily due to the following factors. The removal of the incremental Amber/Green and Amber/Red assessments ratings. The programme remains in the concept phase and will submit an Outline Business Case in July 22","startDate":"2021-04-28","endDate":"2031-03-31","scheduleNarrative":"Compared to 2021-Q4, the project end-date remained scheduled to finish on 31 March 2031.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests)","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests)","benefits":null,"benefitsNarrative":"","themes":["Commercial & supply chain","Approvals & decisions","Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating decreased from Amber/Green to Amber. This is primarily due to the following factors. The removal of the incremental Amber/Green and Amber/Red assessments ratings. The programme remains in the concept phase and will submit an Outline Business…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"MOD_0126_2021-Q4","year":2023,"name":"Next Generation (fixed) Communication Network","department":"MOD","category":"ICT","description":"The intent of the Next Generation (fixed) Communications Network Programme is to develop a secure; singular; modern enterprise network which connects sensors; effectors; and deciders across military and business domains.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. Whilst the programme Delivery Confidence Assessment is the same as it was 12 months ago, the programme has been maturing the Outline Business Case, which is now in place, addressing the cost and schedule challenges. A key focus for the programme now is active risk management of programme resourcing in highly skilled areas that are in sector wide shortages.","startDate":"2021-04-28","endDate":"2030-12-11","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 decreased from 2031-03-31 to 2030-12-11. This is primarily due to the following factors. The Programme schedule has recently been baselined following submission of the Outline Business Case.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This programme does not report cashable benefits. Its aim is to provision the armed forces with the equipment and / or infrastructure required.","themes":["Commercial & supply chain","Delivery & schedule","Cost & funding","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. Whilst the programme Delivery Confidence Assessment is the same as it was 12 months ago, the programme has been maturing the Outline Business Case, which is now in…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"MOD_0126_2021-Q4","year":2024,"name":"Next Generation (fixed) Communication Network","department":"MOD","category":"ICT","description":"The intent of the Next Generation (fixed) Communications Network (NGCN) Programme is to develop a secure; singular; modern enterprise network which connects sensors; effectors; and deciders across military and business domains. NGCN will form a key part of the Digital Backbone for Defence; delivering network services and technical components that are essential to the delivery of the Digital Strategy for Defence.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 decreased from Amber to Red. This is primarily due to the following factors. The risk, complexity and cost to migrating existing services are greater than previously anticipated. A new schedule to time and cost is currently awaiting approval. Once approved the programme can proceed with market engagement. Due to sector wide shortages in highly skilled areas recruitment continues to threaten the delivery schedule.","startDate":"2021-04-28","endDate":"2030-12-11","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained on schedule to finish on 2030-12-11. This primarily due to the following factors. The programme schedule has been revised to take into account further understanding of the complexity of transitioning to new services without compromising current capability. This has not impacted the overall schedule.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests)","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":0.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 0m.","themes":["Delivery & schedule","Commercial & supply chain","Cost & funding","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 decreased from Amber to Red. This is primarily due to the following factors. The risk, complexity and cost to migrating existing services are greater than previously anticipated. A new schedule to time and cost is currently awaiting…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"MOD_0126_2021-Q4","year":2025,"name":"NEXT GENERATION (FIXED) COMMUNICATION NETWORK","department":"MoD","category":"Military Capability","description":"The intent of the Next Generation Communications Network (NGCN) Programme is to develop a secure, singular, modern enterprise network which connects sensors, effectors and deciders across military and business domains. NGCN will form a key part of the Digital Backbone for Defence, delivering network services and technical components.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 increased from RED to AMBER. This is primarily due to the following factors. The programme was reset with the issuance of a new mandate in March 2024. An independent Assurance Review in June 2024 assessed Delivery Confidence as Amber noting that significant progress had been made. An updated Outline Business Case was approved in October 2024 and the programme is now preparing for market engagement. A Delivery Partner was onboarded in February 2025 to support delivery.","startDate":"2021-04-28","endDate":"2030-12-11","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 11/12/2030. This is primarily due to the following factors.","fyBaseline":304.82,"fyForecast":244.46,"fyVariance":19.8,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. An out-turn of 20% underspend of budget due mainly to current supplier performance in the delayed delivery of network improvement changes under existing contract arrangements.","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0.","themes":["Delivery & schedule","Commercial & supply chain","Cost & funding","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 increased from RED to AMBER. This is primarily due to the following factors. The programme was reset with the issuance of a new mandate in March 2024. An independent Assurance Review in June 2024 assessed Delivery Confidence as Amber noting that significant progress…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"MOD_0126_2021-Q4","year":2026,"name":"NEXT GENERATION (FIXED) COMMUNICATION NETWORK","department":"MOD","category":"Information and Communications Technology (ICT)","description":"The intent of the Next Generation Communications Network Programme is to evolve the existing service into a single logical consolidated enterprise network capability which is coherently architected. Addresses the current security and resilience concerns and drives greater value for money by transforming the MOD Core Network against agreed acceptance quality criteria to enable the closure of Defence Fixed Telecommunications Service legacy, whilst preparing for the future by procuring suppliers to take-on and continue transforming the enhanced core network with an under-pinning operating model which enables continuous improvement in business as usual. This is critical to Defence operations and maintaining strategic advantage; as the enhanced service is the foundation of the Digital Backbone.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 decreased to Red. This is primarily due to the following factors, an independent assurance review conducted in March 2026 rated the Programme as red due to the scheduled forecast at time of review reporting completion beyond the allocated funding to the Programme. Baseline reviews by the programme to revaluate and refine the delivery plans were ongoing at the time of the assurance review. An improved schedule has now been developed and will be assessed by the Review Team when they return to reassess progress performance in Q1 26/27 where an improvement to delivery confidence is anticipated.","startDate":"2021-04-28","endDate":"2030-03-25","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 decreased from 11/12/2030 to 30/08/2030. This is primarily due to the following factors. 1. Changes to the Programme approach to two key programmes on the critical path which has matured to remove some dependencies to enable greater concurrency of activity. 2. The programme schedule has matured with clear end states defined and success criteria to monitor the performance of the delivery being developed. 3. The delivery schedule is governed through monthly programme boards, quarterly Programme Boards and quarterly senior Defence reviews.","fyBaseline":22.0,"fyForecast":22.0,"fyVariance":22.0,"varianceNarrative":"Exempt under Section 22 – Information intended for future publication ​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4; the project's Departmental-agreed monetised benefits at 25/26-Q4 remained at £0m","themes":["Delivery & schedule","Governance & assurance","Cost & funding","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 decreased to Red. This is primarily due to the following factors, an independent assurance review conducted in March 2026 rated the Programme as red due to the scheduled forecast at time of review reporting completion beyond the allocated funding to…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"MOD_0126_2021-Q4","year":2025,"name":"NEXT GENERATION (FIXED) COMMUNICATION NETWORK","department":"MoD","category":"Military Capability","description":"The intent of the Next Generation Communications Network (NGCN) Programme is to develop a secure, singular, modern enterprise network which connects sensors, effectors and deciders across military and business domains. NGCN will form a key part of the Digital Backbone for Defence, delivering network services and technical components.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 increased from RED to AMBER. This is primarily due to the following factors. The programme was reset with the issuance of a new mandate in March 2024. An independent Assurance Review in June 2024 assessed Delivery Confidence as Amber noting that significant progress had been made. An updated Outline Business Case was approved in October 2024 and the programme is now preparing for market engagement. A Delivery Partner was onboarded in February 2025 to support delivery.","startDate":"2021-04-28","endDate":"2030-12-11","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 11/12/2030. This is primarily due to the following factors.","fyBaseline":304.82,"fyForecast":244.46,"fyVariance":19.8,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. An out-turn of 20% underspend of budget due mainly to current supplier performance in the delayed delivery of network improvement changes under existing contract arrangements.","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0.","themes":["Delivery & schedule","Commercial & supply chain","Cost & funding","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 increased from RED to AMBER. This is primarily due to the following factors. The programme was reset with the issuance of a new mandate in March 2024. An independent Assurance Review in June 2024 assessed Delivery Confidence as Amber noting that significant progress…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":1,"transition":"Worsened","endDateDeltaDays":-261,"attentionScore":67,"attentionReasons":["Current published delivery confidence is Red","Published rating worsened from Amber to Red","In-year forecast variance is +22.0%"]},{"id":"BEIS_0008_2021-Q3","year":2026,"name":"SELLAFIELD PRODUCT AND RESIDUE STORE RETREATMENT PLANT PROJECT","department":"DESNZ","category":"Infrastructure and Construction","description":"The Sellafield Product & Residue Store Retreatment Plant (SRP) project is a key element of the Sellafield Ltd ’Special Nuclear Materials Future State Programme (SNMFSP)’. The SRP is a complex major project required to provide the capability to receive special nuclear material in existing packages, from existing stores on the Sellafield site, and process the material into a form and package suitable for safe and secure long-term interim storage.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 decreased to Amber. This is primarily due to the following factors: - Impact relating to the legislative changes of Passive Fire Protection standards and the implementation of the changes to the Building Safety Act (2022) following the Grenfell Tower Inquiry. The legislative changes will require a significant amount of engineering design rework and additional installation work in the new facility; the key impact is expected to be on the schedule to achieve readiness of the facility for Glove box installation. - The project has also been impacted by extraordinary inflation and Industrial Action. This will result in a request to DESNZ PIC for P80 cost and schedule contingency sanction relief when appropriate. This is essential to restore contingency levels necessary for project completion.","startDate":"2012-03-01","endDate":"2031-06-24","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 increased from 01/04/2030 to 24/06/2031. This 15 month movement is reflective of the impact of legislative changes to Passive Fire Protection standards.","fyBaseline":235.24,"fyForecast":208.61,"fyVariance":11.32,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors: - Assessed Impact of Passive Fire Protection legislative change & Industrial Action. - Screw & Batch Furnaces reflect overspends and prolongation of scope due to supplier & technical issues.","wholeLifeCost":1432.89,"costNarrative":"The increase to the project's departmentally agreed Whole Life Cost at 25/26-Q4 is primarily due to: - Annual Indexation, in line with the agreed indices.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors There are no monetised benefits defined within the Sellafield Product & Residue Store Retreatment Plant (SRP) FBC. SRP will provide key capabilities which will enable the delivery of benefits to the Special Nuclear Materials (SNM) Future State Programme at Sellafield. The retreatment and repackaging capability provided will reduce the risk associated with current plutonium storage conditions at Sellafield. The UK has the largest inventory of separated civil plutonium in the world, most of which is stored at Sellafield, safe and secure management of this material is a priority. SNM has identified three long term benefits that will be fully realised once all plutonium packages have been retreated or repackaged and consolidated within modern storage facilities. - Enhanced nuclear Safety & Security. - Improved high security resilience and a reduction in the number of Category-1 facilities. - Value for money by reducing the size of the delivery organisation required for managing future plutonium stocks.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 decreased to Amber. This is primarily due to the following factors: - Impact relating to the legislative changes of Passive Fire Protection standards and the implementation of the changes to the Building Safety Act (2022) following the Grenfell Tower…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"BEIS_0008_2021-Q3","year":2021,"name":"Sellafield Product and Residue Store Retreatment Plant","department":"BEIS","category":"Infrastructure and Construction","description":"To provide a facility that will receive special nuclear material from existing stores on the Sellafield site and process into a form suitable for safe and secure storage until 2120.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber/red.This is primarily due to the following factors: This is a complex, \"first of a kind\" nuclear project, and as such has a high degree of delivery risk. Full Business Case (FBC) progressing towards HMG approval in Q1 2021. The Full Business Case (FBC) is based on the Major Project Baseline developed with Programme & Project Partners (PPP) and a matured view of the project scope and market informed cost and schedule information. Pending FBC approval the project performance continues to be reported against the Outline Business Case (OBC) approved in 2017. Delivery of the project has been affected by Covid-19 since March 2020 with significant efforts ongoing to minimise impact on overall cost and schedule. This report only includes COVID impact up to June 2021, and there is evidence that Lockdown 3 has indeed caused efficiency losses in design completion by limited attendance in the office. Site construction has remained 'resilient' due to the robust COVID measures and management put in place; which enabled the progress of the main civil works, with completion of the main slab to the revised COVID impacted plan.","startDate":"2012-03-01","endDate":"2026-11-02","scheduleNarrative":"The project end-date is 02 November 2026. This is primarily due to the following factors: The project end date reflected in the Outline Business Case, 02 November 2026. The Full Business Case (FBC) baseline is finalised, and the Programme and Project Partners Major Project Baseline have set in the project completion date of February 2029. The FBC is currently going through NDA & HMG approvals (forecast June 2021 vs planned September 2021).","fyBaseline":86.24,"fyForecast":64.28,"fyVariance":-25.0,"varianceNarrative":"The budget variance exceeds 5%. The Full Business Case (FBC) baseline is finalised, and the Programme and Project Partners (PPP) Major Project Baseline have been set. This will result in a revised budget for Financial Year 2020/21 of �61m, the SRP project have reprofiled scope as part of their revised delivery strategy, this includes in the impact of COVID-19 up until the end of June 2021. The will result in a variance less than 5%.","wholeLifeCost":763.98,"costNarrative":"The projects Baseline Whole Life Cost is �763.98m. This is primarily due to the following factors: The whole lifetime cost is based on the last approved Outline Business Case. The forecast information in this submission is based around the Full Business Case (FBC) progressing towards HMG approval in Q1 2021. The FBC is based on the Major Project Baseline developed with Programme and Project Partners and a matured view of the project scope and market informed cost and schedule information. The project FBC has undergone extensive assurance during its development. The FBC baseline gives a project completion date of February.","benefits":null,"benefitsNarrative":"","themes":["Delivery & schedule","Approvals & decisions","Cost & funding","Scope & requirements"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber/red.This is primarily due to the following factors: This is a complex, \"first of a kind\" nuclear project, and as such has a high degree of delivery risk. Full Business Case (FBC) progressing towards HMG approval in Q1 2021. The Full Business Case (FBC) is based on the…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21"},{"id":"BEIS_0008_2021-Q3","year":2022,"name":"Sellafield Product and Residue Store Retreatment Plant","department":"BEIS","category":"Infrastructure and Construction","description":"To provide a facility that will receive special nuclear material from existing stores on the Sellafield site and process into a form suitable for safe and secure storage until 2120.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 decreased from Amber/red to Amber This is a complex, \"first of a kind\" nuclear project, and as such has a high degree of delivery risk. Full Business Case (FBC) achieved HMG approval in Q2 2021. The Full Business Case (FBC) is based on the Major Project Baseline developed with Programme & Project Partners (PPP) and a matured view of the project scope and market informed cost and schedule information.","startDate":"2012-03-01","endDate":"2029-08-20","scheduleNarrative":"Compared to 2021-Q4, your project end-date increased from 02 NOV 2026 to 20 AUG 2029 . This is primarily due to the following factors: The Full Business Case (FBC) was approved in July 2021, and the Programme and Project Partners (PPP) Major Project Baseline have been set. This result in a revised project end date of the 20th August 2029.","fyBaseline":113.54,"fyForecast":111.79,"fyVariance":-2.0,"varianceNarrative":"The GMPP project did not provide data","wholeLifeCost":1278.0,"costNarrative":"Compared to2021-Q4, the projects Baseline Whole Life Cost increased from 763.98 (£m) to 1277.71 (£m). This is primarily due to the following factors: The whole lifetime cost is based on the last approved Full Business Case. The FBC is based on the Major Project Baseline developed with Programme and Project Partners and a matured view of the project scope and market informed cost and schedule information. The project FBC has undergone extensive assurance during its development. The FBC baseline has a project P50 completion date of August 29 and the PPP 'offered' target is February 29.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 decreased from Amber/red to Amber This is a complex, \"first of a kind\" nuclear project, and as such has a high degree of delivery risk. Full Business Case (FBC) achieved HMG approval in Q2 2021. The Full Business Case (FBC) is based…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"BEIS_0008_2021-Q3","year":2023,"name":"Sellafield Product and Residue Store Retreatment Plant","department":"DESNZ","category":"Infrastructure and Construction","description":"To provide a facility that will receive special nuclear material from existing stores on the Sellafield site and process into a form suitable for safe and secure storage until 2120.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 increased from Amber (IPA rating) to Green (SRO rating). This is primarily due to the following factors. This is a complex, first of a kind nuclear project, and as such has a high degree of delivery risk. The SRP project is being delivered by the Programme and Project Partnership (PPP). The IPA afforded this project a RAG rating of GREEN.","startDate":"2012-03-01","endDate":"2029-10-09","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 increased from 2029-08-20 to 2029-10-09. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 increased from 2029-08-20 to 2029-10-09. This is primarily due to the following factors. Following the approval of an adjustment event associated with covid impact (from June 2021 to the end of March 22), there was a update to the baseline to reflect the schedule adjustment.","fyBaseline":210.08,"fyForecast":171.46,"fyVariance":-18.0,"varianceNarrative":"The variance between the 22/23 baseline and actual is due to several factors: The project has made a number of true savings against the FBC on the scope delivered to date, there has been positive management action taken to secure supply chain contracts for less than the budget. In addition, the project was able to deliver 19.5m of the working plan last financial year in order to de-risk the forward schedule.","wholeLifeCost":1380.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 increased from 1278m. to 1380m. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 increased from 1278m. to 1380m. This is primarily due to the following factors. Compared to 21/22-Q4, the SRP budgeted cost (baseline) has increased by 102.5m. 97.5m is due to escalation in line with the agreed indices. In addition, an approved adjustment event for covid impact was implemented increasing the baseline by a further 5m.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. The project did not provide departmental-agree monetised benefits at 22/23-Q4. There are no monetised benefits defined within the Sellafield Product & Residue Store Retreatment Plant (SRP) FBC. SRP will provide key capabilities which will enable the delivery of benefits to the Special Nuclear Materials (SNM) Future State Programme at Sellafield. The retreatment and repackaging capability provided will reduce the risk associated with current plutonium storage conditions at Sellafield. The UK has the largest inventory of separated civil plutonium in the world, most of which is stored at Sellafield, safe and secure management of this material is a priority. SNM has identified three long term benefits that will be fully realised once all plutonium packages have been retreated or repackaged and consolidated within modern storage facilities. Enhanced nuclear Safety & Security. Improved high security resilience and a reduction in the number of Category-1 facilities. Value for money by reducing the size of the delivery organisation required for managing future plutonium stocks.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 increased from Amber (IPA rating) to Green (SRO rating). This is primarily due to the following factors. This is a complex, first of a kind nuclear project, and as such has a high degree of delivery risk. The SRP project is being delivered by the Programme and Project…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"BEIS_0008_2021-Q3","year":2024,"name":"Sellafield Product and Residue Store Retreatment Plant","department":"DESNZ","category":"Infrastructure and Construction","description":"To provide a facility that will receive special nuclear material from existing stores on the Sellafield site and process into a form suitable for safe and secure storage until 2120.","ipaDca":"Green","sroDca":null,"deliveryConfidence":"Green","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Delivery Confidence Assessment rating at 23/24-Q4 remained at Green(IPA rating). This is primarily due to the following factors. This is a complex, \"first of a kind\" nuclear project, and as such has a high degree of delivery risk. Earlier this financial year the IPA completed their annual independent 'Gate 0' review affording the SRP Project a DCA Rating of Green.","startDate":"2012-03-01","endDate":"2029-10-09","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2029-10-09. This is primarily due to the following factors. There has been no movement to the projects end date.","fyBaseline":239.15,"fyForecast":198.45,"fyVariance":-17.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The variance between the 23/24 baseline (239.15m) and actuals (198.45m) is due to the impact of delays on site with construction activities and prolongation of offsite manufacturing packages of work.","wholeLifeCost":1433.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 increased from 1380m. to 1433m. This is primarily due to the following factors. The SRP budgeted cost (baseline) has increased by 52m. This is due to escalation in line with the agreed indices.","benefits":0.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 0m. There are no monetised benefits defined within the Sellafield Product & Residue Store Retreatment Plant (SRP) FBC. SRP will provide key capabilities which will enable the delivery of benefits to the 'Special Nuclear Materials (SNM) Future State Programme' at Sellafield. The retreatment and repackaging capability provided will reduce the risk associated with current plutonium storage conditions at Sellafield. The UK has the largest inventory of separated civil plutonium in the world, most of which is stored at Sellafield, safe and secure management of this material is a priority. SNM has identified three long term benefits that will be fully realised once all plutonium packages have been retreated or repackaged and consolidated within modern storage facilities. . Enhanced nuclear Safety & Security. . Improved high security resilience and a reduction in the number of Category-1 facilities. . Value for money by reducing the size of the delivery organisation required for managing future plutonium stocks.","themes":["Cost & funding","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Delivery Confidence Assessment rating at 23/24-Q4 remained at Green(IPA rating). This is primarily due to the following factors. This is a complex, \"first of a kind\" nuclear project, and as such has a high degree of delivery risk. Earlier this financial year the IPA completed their annual independent 'Gate 0' review…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"BEIS_0008_2021-Q3","year":2025,"name":"SELLAFIELD PRODUCT AND RESIDUE STORE RETREATMENT PLANT PROJECT","department":"DESNZ","category":"Infrastructure and Construction","description":"The Sellafield Product & Residue Store Retreatment Plant (SRP) project will provide key capabilities as a key part of the Sellafield Ltd 'Special Nuclear Materials (SNM) Future State Programme'. This is a complex project required to provide the capability to receive special nuclear material in existing packages, from existing stores on the Sellafield site, and process the material into a form and package suitable for safe and secure long-term interim storage.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at GREEN. This is primarily due to the following factors‚ This is a complex nuclear project on an operational nuclear site. The Project is in the execution stage and continues with the final stages of bulk civil construction, is transitioning into mechanical and electrical fit out and is currently showing no significant threat to the overall P80 schedule. The SRP project is being delivered by the Programme and Project Partnership (PPP). The IPA afforded this project a RAG rating of GREEN.","startDate":"2012-03-01","endDate":"2030-04-01","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 09/10/2029 to 01/04/2030. This is primarily due to the following factors‚ The project end date has moved as a result of baseline change for P80 drawdown due to delays incurred by the global shortage of microchips and semiconductors. This movement and the project end date remains within the overall P80 dates approved in the Full Business Case (FBC).","fyBaseline":256.87,"fyForecast":221.92,"fyVariance":13.61,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The in year spend is less than the budget (baseline) for 2024/25 primarily due to the agreed annual funding allocation and un-utilisation of the full contingency allocated to FY24/25.","wholeLifeCost":1471.12,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 1433 to 1471. This is primarily due to the following factors‚ Compared to 23/24-Q4, the SRP budgeted cost (baseline) has increased by ~£38m, this is due to £21m of escalation in line with agreed indices, and £17m as a result of baseline change for P80 drawdown due to delays incurred by the global shortage of microchips and semiconductors.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ There are no monetised benefits defined within the Sellafield Product & Residue Store Retreatment Plant (SRP) FBC. SRP will provide key capabilities which will enable the delivery of benefits to the ‘Special Nuclear Materials (SNM) Future State Programme’ at Sellafield. The retreatment and repackaging capability provided will reduce the risk associated with current plutonium storage conditions at Sellafield. The UK has the largest inventory of separated civil plutonium in the world, most of which is stored at Sellafield, safe and secure management of this material is a priority. SNM has identified three long term benefits that will be fully realised once all plutonium packages have been retreated or repackaged and consolidated within modern storage facilities. • Enhanced nuclear Safety & Security. • Improved high security resilience and a reduction in the number of Category-1 facilities. • Value for money by reducing the size of the delivery organisation required for managing future plutonium stocks.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at GREEN. This is primarily due to the following factors‚ This is a complex nuclear project on an operational nuclear site. The Project is in the execution stage and continues with the final stages of bulk civil…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"BEIS_0008_2021-Q3","year":2026,"name":"SELLAFIELD PRODUCT AND RESIDUE STORE RETREATMENT PLANT PROJECT","department":"DESNZ","category":"Infrastructure and Construction","description":"The Sellafield Product & Residue Store Retreatment Plant (SRP) project is a key element of the Sellafield Ltd ’Special Nuclear Materials Future State Programme (SNMFSP)’. The SRP is a complex major project required to provide the capability to receive special nuclear material in existing packages, from existing stores on the Sellafield site, and process the material into a form and package suitable for safe and secure long-term interim storage.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 decreased to Amber. This is primarily due to the following factors: - Impact relating to the legislative changes of Passive Fire Protection standards and the implementation of the changes to the Building Safety Act (2022) following the Grenfell Tower Inquiry. The legislative changes will require a significant amount of engineering design rework and additional installation work in the new facility; the key impact is expected to be on the schedule to achieve readiness of the facility for Glove box installation. - The project has also been impacted by extraordinary inflation and Industrial Action. This will result in a request to DESNZ PIC for P80 cost and schedule contingency sanction relief when appropriate. This is essential to restore contingency levels necessary for project completion.","startDate":"2012-03-01","endDate":"2031-06-24","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 increased from 01/04/2030 to 24/06/2031. This 15 month movement is reflective of the impact of legislative changes to Passive Fire Protection standards.","fyBaseline":235.24,"fyForecast":208.61,"fyVariance":11.32,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors: - Assessed Impact of Passive Fire Protection legislative change & Industrial Action. - Screw & Batch Furnaces reflect overspends and prolongation of scope due to supplier & technical issues.","wholeLifeCost":1432.89,"costNarrative":"The increase to the project's departmentally agreed Whole Life Cost at 25/26-Q4 is primarily due to: - Annual Indexation, in line with the agreed indices.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors There are no monetised benefits defined within the Sellafield Product & Residue Store Retreatment Plant (SRP) FBC. SRP will provide key capabilities which will enable the delivery of benefits to the Special Nuclear Materials (SNM) Future State Programme at Sellafield. The retreatment and repackaging capability provided will reduce the risk associated with current plutonium storage conditions at Sellafield. The UK has the largest inventory of separated civil plutonium in the world, most of which is stored at Sellafield, safe and secure management of this material is a priority. SNM has identified three long term benefits that will be fully realised once all plutonium packages have been retreated or repackaged and consolidated within modern storage facilities. - Enhanced nuclear Safety & Security. - Improved high security resilience and a reduction in the number of Category-1 facilities. - Value for money by reducing the size of the delivery organisation required for managing future plutonium stocks.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 decreased to Amber. This is primarily due to the following factors: - Impact relating to the legislative changes of Passive Fire Protection standards and the implementation of the changes to the Building Safety Act (2022) following the Grenfell Tower…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"BEIS_0008_2021-Q3","year":2025,"name":"SELLAFIELD PRODUCT AND RESIDUE STORE RETREATMENT PLANT PROJECT","department":"DESNZ","category":"Infrastructure and Construction","description":"The Sellafield Product & Residue Store Retreatment Plant (SRP) project will provide key capabilities as a key part of the Sellafield Ltd 'Special Nuclear Materials (SNM) Future State Programme'. This is a complex project required to provide the capability to receive special nuclear material in existing packages, from existing stores on the Sellafield site, and process the material into a form and package suitable for safe and secure long-term interim storage.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at GREEN. This is primarily due to the following factors‚ This is a complex nuclear project on an operational nuclear site. The Project is in the execution stage and continues with the final stages of bulk civil construction, is transitioning into mechanical and electrical fit out and is currently showing no significant threat to the overall P80 schedule. The SRP project is being delivered by the Programme and Project Partnership (PPP). The IPA afforded this project a RAG rating of GREEN.","startDate":"2012-03-01","endDate":"2030-04-01","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 09/10/2029 to 01/04/2030. This is primarily due to the following factors‚ The project end date has moved as a result of baseline change for P80 drawdown due to delays incurred by the global shortage of microchips and semiconductors. This movement and the project end date remains within the overall P80 dates approved in the Full Business Case (FBC).","fyBaseline":256.87,"fyForecast":221.92,"fyVariance":13.61,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The in year spend is less than the budget (baseline) for 2024/25 primarily due to the agreed annual funding allocation and un-utilisation of the full contingency allocated to FY24/25.","wholeLifeCost":1471.12,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 1433 to 1471. This is primarily due to the following factors‚ Compared to 23/24-Q4, the SRP budgeted cost (baseline) has increased by ~£38m, this is due to £21m of escalation in line with agreed indices, and £17m as a result of baseline change for P80 drawdown due to delays incurred by the global shortage of microchips and semiconductors.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ There are no monetised benefits defined within the Sellafield Product & Residue Store Retreatment Plant (SRP) FBC. SRP will provide key capabilities which will enable the delivery of benefits to the ‘Special Nuclear Materials (SNM) Future State Programme’ at Sellafield. The retreatment and repackaging capability provided will reduce the risk associated with current plutonium storage conditions at Sellafield. The UK has the largest inventory of separated civil plutonium in the world, most of which is stored at Sellafield, safe and secure management of this material is a priority. SNM has identified three long term benefits that will be fully realised once all plutonium packages have been retreated or repackaged and consolidated within modern storage facilities. • Enhanced nuclear Safety & Security. • Improved high security resilience and a reduction in the number of Category-1 facilities. • Value for money by reducing the size of the delivery organisation required for managing future plutonium stocks.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at GREEN. This is primarily due to the following factors‚ This is a complex nuclear project on an operational nuclear site. The Project is in the execution stage and continues with the final stages of bulk civil…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":1,"transition":"Worsened","endDateDeltaDays":449,"attentionScore":67,"attentionReasons":["Current published delivery confidence is Amber","Published rating worsened from Green to Amber","Published end date moved 449 days later","In-year forecast variance is +11.3%"]},{"id":"HMRC_0031_2122-Q3","year":2026,"name":"UNITY PROGRAMME","department":"HMRC","category":"Government Transformation and Service Delivery","description":"The Shared Service Strategy for government launched in March 2021 setting out the vision to transform Shared Services across the civil service improving end users experience. To achieve this 5 clusters have been formed across the civil service. HM Revenue & Customs (HMRC), Department for Transport (DfT) and Ministry of Housing, Communities and Local Government (MHCLG) collectively make up the Unity Programme. The Unity Vision is to transform HR, Finance and Procurement across HMRC, DfT and MHCLG groups, creating a unified shared service which is user centric, swift and cost effective. Our colleagues will be empowered through intuitive, streamlined and automated processes, improving their experience and enabling everyone to spend more time delivering essential services for the public.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Delivery confidence is improving. Since 2024/25, issues have emerged in planning, governance and delivery control, which have affected pace and confidence. The programme has now put in place a revised delivery approach and strengthened governance, with a clearer plan and leadership model to stabilise delivery. These actions are focused on restoring control and improving delivery confidence over the coming year.","startDate":"2021-02-01","endDate":"2028-04-30","scheduleNarrative":"Compared to financial year 24/25 Q4, the project's end-date at 25/26 Q4 increased from 31/12/2027 to 30/04/2028. This is primarily due to the following factors: There has been slower progress in development and delivery across projects than anticipated. There are also issues with current resourcing levels to achieve delivery timelines. Detailed replanning is underway to bring confidence to milestone delivery and Go Live dates.","fyBaseline":66.79,"fyForecast":66.98,"fyVariance":0.29,"varianceNarrative":"The budget variance is less than 5%","wholeLifeCost":245.97,"costNarrative":"Compared to financial year 24/25 Q4, the programme's departmentally agreed Whole Life Cost at 25/26 Q4 (measured in £m) remained at 259. However, it is anticipated that the movement of delivery timelines to the right, and addressing the under resourcing of the programme will result in the need for additional funds to complete the programme. This will be quantified in the next version of the Business Case being submitted late summer 2026.","benefits":33.7,"benefitsNarrative":"Compared to financial year 24/25 Q4, the programme's departmentally agreed Benefits at 25/26 Q4 (measured in £m) remained at £33M.","themes":["Delivery & schedule","Cost & funding","Governance & assurance","Workforce & capability"],"evidenceExcerpt":"Delivery confidence is improving. Since 2024/25, issues have emerged in planning, governance and delivery control, which have affected pace and confidence. The programme has now put in place a revised delivery approach and strengthened governance, with a clearer plan and leadership model to stabilise delivery. These actions are focused on restoring control…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"HMRC_0031_2122-Q3","year":2022,"name":"GSS HMRC Led Cluster Programme","department":"HMRC","category":"Government Transformation and Service Delivery","description":"The Cabinet Office aims to drive greater efficiency and effectiveness in the delivery of corporate services by taking a cross-government approach, allowing for greater interoperability across the Civil Service, thereby delivering better outcomes. HM Revenue & Customs (HMRC), Department for Transport (DfT) and Department for Levelling Up, Housing and Communities (DLUHC) collectively are the GSS HMRC Led Cluster Programme working with Government Business Services (GBS) to address the Cabinet Office aims.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 is Red The overall delivery confidence is set at Red because at this stage there is no certainty as to whether the programme will be funded. Discussions in relation to funding are continuing with the Cabinet Office and HM Treasury.","startDate":"2021-02-01","endDate":"2026-12-31","scheduleNarrative":"Your project end-date is 31 DEC 2026. This is primarily due to the following factors: Our current planning assumption is that we will complete the programme and stand-up the full HMRC led Shared Service function (People and systems) by end of 2026, in line with the Shared Services for Government Strategy.","fyBaseline":1.12,"fyForecast":1.12,"fyVariance":0.0,"varianceNarrative":"The budget variance is inferior or equal to 5%.","wholeLifeCost":145.0,"costNarrative":"Your projects Baseline Whole Life Cost is 144.54 (£m). This is primarily due to the following factors: The Whole Life Costs of the Programme are made up of IT solution implementation costs, costs to create the Shared Service (people, transition and business change etc), cost of the programme team and Subject Matter Experts to deliver programme, commercial, and delivery partner costs.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 is Red The overall delivery confidence is set at Red because at this stage there is no certainty as to whether the programme will be funded. Discussions in relation to funding are continuing with the Cabinet Office and HM Treasury. Your project end-date is 31 DEC 2026.…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"HMRC_0031_2122-Q3","year":2023,"name":"Unity Programme","department":"HMRC","category":"Government Transformation and Service Delivery","description":"The shared service strategy for government launched in March 2021 setting out the vision to transform Shared Services across the Civil Service improving end users experience. To achieve this 5 clusters have been formed across the civil service. HM Revenue & Customs (HMRC), Department for Transport (DfT) and Department for Levelling Up, Housing and Communities (DLUHC) collectively make upthe Unity Programme. The Unity Vision is to transform HR, Finance and Procurement across HMRC, DfT and DLUHC groups, creating a unified shared service which is user centric, swift and cost effective. Our colleagues will be empowered through intuitive, streamlined and automated processes, improving their experience and enabling everyone to spend more time delivering essential servicesfor the public.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Red. This is primarily due to the following factors. The quarterly assessment has changed to red for this quarter. This recognises that the Programme has a number of key design decisions outstanding, which all three departments must agree, in order to remain on our critical path to stand up shared services for HMRC and Department for Transport in June. The programme also lacks a number of critical skills and dedicated resources, which further puts progress at risk. The programme has been working with its delivery partner to create a critical decision path and a back to amber plan which has been agreed with the Programme Board. The programme will be focusing on this plan over the next quarter, to get key decisions agreed, key resources in place and build stakeholder confidence in the plans in advance of moving into the delivery phase. The lifecycle RAG is deemed amber as we can deliver against end lifecycle outcome.","startDate":"2021-02-01","endDate":"2026-12-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2026-12-31. This is primarily due to the following factors. Our current planning assumption is that we will complete the programme and stand up the full HMRC led shared service function (people and systems) by the end of 2026 for HMRC and Department for Transport, with Department for Levelling up Housing and Communities joining in 2026/27. This is in line with the shared services strategy for government.","fyBaseline":26.09,"fyForecast":17.46,"fyVariance":-33.0,"varianceNarrative":"Programme costs were significantly lower than originally forecast in 22/23. The Outline Business Case was not approved until November 2023, which was much later than anticipated and meant that the delivery phases of the programme were pushed back. The Technology Delivery Partner was therefore appointed in Q4, later than originally planned, the programme team was not ramped up until Q4 and the next version of the business case pushed into 23/24 which meant that the original plans to spend 3.3m on a Technology Delivery Partner in 22/23 did not materialise.","wholeLifeCost":214.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 increased from 145m. to 214m. This is primarily due to the following factors. The project's departmentally-agreed Whole Life Cost at 22/23-Q4 is 214m. This is due to: The Whole Life Costs of the Programme are made up of IT solution implementation costs, costs to create the Shared Service (people, transition and business change etc), cost of the programme team and Subject Matter Experts to deliver programme, commercial, and delivery partner costs. The Programme's previous GMPP returns reported costs until 25/26 , this now reflects Whole Life Cost up until 31/32.","benefits":43.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 43m. The project's departmentally-agreed monetised benefits at 22/23-Q4 is 42.576m. This is due to: The Programme is forecasting 42.58m sustainable efficiencies over the life cycle, with cumulative efficiencies of 238.72m. This is an increase in cumulative savings of 8.65m due to increased IT savings (0.38m) and staff productivity (19.6m), offset by a reduction in headcount savings (18.65m) due to the revised delivery timeline at our outline business case delaying benefit realisation to 2024/25. All assumptions are being revalidated in our preparation of the programme business case in Q1 23/24.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Technical & integration"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Red. This is primarily due to the following factors. The quarterly assessment has changed to red for this quarter. This recognises that the Programme has a number of key design decisions outstanding, which all three…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"HMRC_0031_2122-Q3","year":2024,"name":"Unity Programme","department":"HMRC","category":"Government Transformation and Service Delivery","description":"","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 decreased from Red to Amber. This is primarily due to the following factors. The Programme remains amber. We have moved into delivery phase of the programme and have made significant progress in procuring our technology delivery partner and software provider. We have moved into formal implementation for June 24 (when DfT legacy shared services, and people move to HMRC Unity Business Services). _x000D_ Unity Business Services is now established in HMRC and Unity Technical Services (supporting services through the programme and beyond). We will continue to work to embed and evolve services as we deliver. We continue building programme delivery capability. We have renewed engagement with our programme delivery partner, appointed a senior delivery lead and have started recruitment for a new programme director. Next year (2024-25) remains a key delivery year for the programme. Although there are challenges ahead, we are positioned for success.","startDate":"2021-02-01","endDate":"2027-03-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 increased from 2026-12-31 to 2027-03-31. This is primarily due to the following factors. Our current planning assumption is that we will complete the programme and stand up the full HMRC led shared service function (people and systems) by the end of 2026 for HMRC and Department for Transport, with Department for Levelling up Housing and Communities joining in 2026/27. This is in line with the shared services strategy for government.","fyBaseline":23.8,"fyForecast":23.8,"fyVariance":0.0,"varianceNarrative":"The budget variance is inferior or equal to 5%.","wholeLifeCost":437.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 increased from 214m. to 437m. This is primarily due to the following factors. The programme's previous GMPP annual return reported outline costs covering an 11-year period. The next iteration includes enhanced cost information and covers a period of 15 years to align with other clusters as requested by Cabinet Office.","benefits":38.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 2324-Q4 decreased from 43m. to 38m. The Programme is forecasting 42.58m sustainable efficiencies over the life cycle, with cumulative efficiencies of 238.72m. This is an increase in cumulative savings of 8.65m due to increased IT savings (0.38m) and staff productivity (19.6m), offset by a reduction in headcount savings (18.65m) due to the revised delivery timeline delaying benefit realisation to 2024/25.","themes":["Delivery & schedule","Cost & funding","Technical & integration","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 decreased from Red to Amber. This is primarily due to the following factors. The Programme remains amber. We have moved into delivery phase of the programme and have made significant progress in procuring our technology delivery…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"HMRC_0031_2122-Q3","year":2025,"name":"UNITY PROGRAMME","department":"HMRC","category":"Government Transformation and Service Delivery","description":"The Shared Service Strategy for government launched in March 2021 setting out the vision to transform Shared Services across the civil service improving end users experience. To achieve this, five clusters have been formed across the civil service. HM Revenue & Customs (HMRC), Department for Transport (DfT) and Ministry of Housing, Communities and Local Government (MHCLG) collectively make up the Unity Programme. The aim for Unity is to transform HR, Finance and Procurement across HMRC, DfT and MHCLG groups, create a unified shared service for transactional activity which is user centric, swift and cost effective, and through deployment of modern technologies, transform the corporate offer within each department. Our colleagues will be empowered through intuitive, streamlined and automated processes, improving their experience and enabling everyone to spend more time delivering essential services for the public. This programme supports both the Prime Minister's plans for a Productive and Agile State and the delivery of Departmental efficiency targets.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The Programme remains amber. We have moved into delivery phase of the programme and have made significant progress in 24/25 through transitioning DfT legacy shared services, and people to HMRC Unity Business Services in June 24, and onboarding of our technology delivery partner (Deloitte) and software provider (SAP) in November 2024. This has enabled us to mobilise our delivery projects, complete discovery work and start detailed design. Over the last year we have focused on building capability for the next stage, mitigating risks to support delivery and build strong, trusted relationships across our stakeholders and partners. We have appointed a new Programme Director, as well as Process and User Experience and Workforce design leads. In 2025-26 we will complete detailed design and build testing ahead of deployment of our first key projects of HR and Payroll. Although there are challenges ahead, we are well positioned for success.","startDate":"2021-02-01","endDate":"2027-12-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2027 to 31/12/2027. This is primarily due to the following factors: Our current planning assumption is that we will complete the programme and stand up the full HMRC led shared service function (people and systems) by the end of Q1 27/28 for HMRC and Department for Transport, with MHCLG and Maritime and Coastguard Agency (MCA) joining in late 2027. This is in line with the shared services strategy for government and reflects a reasonable period for transition and hypercare.","fyBaseline":44.02,"fyForecast":35.91,"fyVariance":18.42,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ This variance has primarily been due to the delay in approvals to sign the contract with Technical Delivery Partner and software supplier by approximately 2.5 months. This meant the Supplier spend was not incurred for this period and, similarly, the programme recognised the movement in it's delivery timescale and re-aligned it's workforce recruitment accordingly, thereby also moving all of the aforementioned additional costs into the next financial year (this is a cost movement rather than a cost reduction).","wholeLifeCost":259.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 437 to 259. This is primarily due to the following factors‚ In the second iteration of the Unity Programme Business Case (PBC) approved by Chief Secretary to the Treasury (CST) in October 2024, whole-life costs reduced from £437m (approved Oct 23) to £259m. The reductions primarily relate to negotiations of actual cost of licences and system integration following a lengthy procurement process, certainty around cost of transformation and increased maturity of programme delivery.","benefits":33.7,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) decreased from 38 to 33. This is primarily due to the following factors‚ The variance reflects updated Programme Business Case which was subsequently approved. The costs had been updated following more mature knowledge and awareness of the cost estimation.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Technical & integration"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The Programme remains amber. We have moved into delivery phase of the programme and have made significant progress in 24/25 through transitioning DfT legacy shared…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"HMRC_0031_2122-Q3","year":2026,"name":"UNITY PROGRAMME","department":"HMRC","category":"Government Transformation and Service Delivery","description":"The Shared Service Strategy for government launched in March 2021 setting out the vision to transform Shared Services across the civil service improving end users experience. To achieve this 5 clusters have been formed across the civil service. HM Revenue & Customs (HMRC), Department for Transport (DfT) and Ministry of Housing, Communities and Local Government (MHCLG) collectively make up the Unity Programme. The Unity Vision is to transform HR, Finance and Procurement across HMRC, DfT and MHCLG groups, creating a unified shared service which is user centric, swift and cost effective. Our colleagues will be empowered through intuitive, streamlined and automated processes, improving their experience and enabling everyone to spend more time delivering essential services for the public.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Delivery confidence is improving. Since 2024/25, issues have emerged in planning, governance and delivery control, which have affected pace and confidence. The programme has now put in place a revised delivery approach and strengthened governance, with a clearer plan and leadership model to stabilise delivery. These actions are focused on restoring control and improving delivery confidence over the coming year.","startDate":"2021-02-01","endDate":"2028-04-30","scheduleNarrative":"Compared to financial year 24/25 Q4, the project's end-date at 25/26 Q4 increased from 31/12/2027 to 30/04/2028. This is primarily due to the following factors: There has been slower progress in development and delivery across projects than anticipated. There are also issues with current resourcing levels to achieve delivery timelines. Detailed replanning is underway to bring confidence to milestone delivery and Go Live dates.","fyBaseline":66.79,"fyForecast":66.98,"fyVariance":0.29,"varianceNarrative":"The budget variance is less than 5%","wholeLifeCost":245.97,"costNarrative":"Compared to financial year 24/25 Q4, the programme's departmentally agreed Whole Life Cost at 25/26 Q4 (measured in £m) remained at 259. However, it is anticipated that the movement of delivery timelines to the right, and addressing the under resourcing of the programme will result in the need for additional funds to complete the programme. This will be quantified in the next version of the Business Case being submitted late summer 2026.","benefits":33.7,"benefitsNarrative":"Compared to financial year 24/25 Q4, the programme's departmentally agreed Benefits at 25/26 Q4 (measured in £m) remained at £33M.","themes":["Delivery & schedule","Cost & funding","Governance & assurance","Workforce & capability"],"evidenceExcerpt":"Delivery confidence is improving. Since 2024/25, issues have emerged in planning, governance and delivery control, which have affected pace and confidence. The programme has now put in place a revised delivery approach and strengthened governance, with a clearer plan and leadership model to stabilise delivery. These actions are focused on restoring control…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"HMRC_0031_2122-Q3","year":2025,"name":"UNITY PROGRAMME","department":"HMRC","category":"Government Transformation and Service Delivery","description":"The Shared Service Strategy for government launched in March 2021 setting out the vision to transform Shared Services across the civil service improving end users experience. To achieve this, five clusters have been formed across the civil service. HM Revenue & Customs (HMRC), Department for Transport (DfT) and Ministry of Housing, Communities and Local Government (MHCLG) collectively make up the Unity Programme. The aim for Unity is to transform HR, Finance and Procurement across HMRC, DfT and MHCLG groups, create a unified shared service for transactional activity which is user centric, swift and cost effective, and through deployment of modern technologies, transform the corporate offer within each department. Our colleagues will be empowered through intuitive, streamlined and automated processes, improving their experience and enabling everyone to spend more time delivering essential services for the public. This programme supports both the Prime Minister's plans for a Productive and Agile State and the delivery of Departmental efficiency targets.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The Programme remains amber. We have moved into delivery phase of the programme and have made significant progress in 24/25 through transitioning DfT legacy shared services, and people to HMRC Unity Business Services in June 24, and onboarding of our technology delivery partner (Deloitte) and software provider (SAP) in November 2024. This has enabled us to mobilise our delivery projects, complete discovery work and start detailed design. Over the last year we have focused on building capability for the next stage, mitigating risks to support delivery and build strong, trusted relationships across our stakeholders and partners. We have appointed a new Programme Director, as well as Process and User Experience and Workforce design leads. In 2025-26 we will complete detailed design and build testing ahead of deployment of our first key projects of HR and Payroll. Although there are challenges ahead, we are well positioned for success.","startDate":"2021-02-01","endDate":"2027-12-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2027 to 31/12/2027. This is primarily due to the following factors: Our current planning assumption is that we will complete the programme and stand up the full HMRC led shared service function (people and systems) by the end of Q1 27/28 for HMRC and Department for Transport, with MHCLG and Maritime and Coastguard Agency (MCA) joining in late 2027. This is in line with the shared services strategy for government and reflects a reasonable period for transition and hypercare.","fyBaseline":44.02,"fyForecast":35.91,"fyVariance":18.42,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ This variance has primarily been due to the delay in approvals to sign the contract with Technical Delivery Partner and software supplier by approximately 2.5 months. This meant the Supplier spend was not incurred for this period and, similarly, the programme recognised the movement in it's delivery timescale and re-aligned it's workforce recruitment accordingly, thereby also moving all of the aforementioned additional costs into the next financial year (this is a cost movement rather than a cost reduction).","wholeLifeCost":259.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 437 to 259. This is primarily due to the following factors‚ In the second iteration of the Unity Programme Business Case (PBC) approved by Chief Secretary to the Treasury (CST) in October 2024, whole-life costs reduced from £437m (approved Oct 23) to £259m. The reductions primarily relate to negotiations of actual cost of licences and system integration following a lengthy procurement process, certainty around cost of transformation and increased maturity of programme delivery.","benefits":33.7,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) decreased from 38 to 33. This is primarily due to the following factors‚ The variance reflects updated Programme Business Case which was subsequently approved. The costs had been updated following more mature knowledge and awareness of the cost estimation.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Technical & integration"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The Programme remains amber. We have moved into delivery phase of the programme and have made significant progress in 24/25 through transitioning DfT legacy shared…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":1,"transition":"Worsened","endDateDeltaDays":121,"attentionScore":67,"attentionReasons":["Current published delivery confidence is Red","Published rating worsened from Amber to Red","Published end date moved 121 days later"]},{"id":"MOD_0107_1617-Q1","year":2026,"name":"PROTECTOR","department":"MOD","category":"Military Capability","description":"Protector will provide a certified Remotely Piloted Air System with enhanced capabilities (to 2040). Protector will provide armed, long range, persistent wide area surveillance with various sensors and be based at RAF Waddington in Lincolnshire.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Red. This is primarily due to the following factors. 1. Although Protector has received the financial approval required to achieve the Initial Operating Capability this year, the programme is awaiting approval for a Review Note which proposes a re-baselining of milestones and a route to a Green rating. 2. Furthermore, sufficiently trained crew numbers, Full Motion Video metadata dissemination issues and weapons testing delays are contributing to reduced Delivery Confidence.","startDate":"2009-04-30","endDate":"2030-06-30","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 30/06/2026. This is primarily due to the following factors. 1. Although the reported end date remains unchanged from Q4 24/25, the programme is awaiting approval for a Review Note which will revise all future milestones including the project end date.","fyBaseline":134.39,"fyForecast":89.51,"fyVariance":33.4,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors: 1. Significant underspend due to directed savings deferrals and spend commitment restrictions.","wholeLifeCost":1732.77,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) increased from £1523M to £1565M. This is primarily due to the following factors. 1. Protector Availability and Support Solution contract award and amendment of the budget numbers to reflect that. 2. Delays of Ground Support Equipment acquisition for in-service/IOC based on item lead times. 3. Reprofile of the Direct Commercial Sales 2 (DCS2) contract. 4.Costs increases driven by revised estimate of DCS2 for Rev E deliverables.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Approvals & decisions","Commercial & supply chain","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Red. This is primarily due to the following factors. 1. Although Protector has received the financial approval required to achieve the Initial Operating Capability this year, the programme is awaiting approval for a Review Note which…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"MOD_0107_1617-Q1","year":2020,"name":"PROTECTOR","department":"MOD","category":"Military Capability","description":"Delivery of a Remotely Piloted Air System.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber, which has improved since last year�s Q2 1819 Amber/Red, due primarily to the following factors; - The improved confidence is attributable to the re-baseline of the Programme and approval of the Review Note with adjusted Control Total by Investment Appraisal Committee Outletter on 8 April 19. This made the programme affordable and approved an adjusted timeline for Initial Operating Capability and Full Operational Capability and incorporated a 28 month slip. - Confidence was also injected into the Programme g when the Direct Commercial Sales 2 Test & Evaluation Contract Milestone was achieved in Sep 19. Award of the infrastructure Phase 1 contract to Boeing UK as well as a number of successful smaller contracts and Critical Design Reviews have also boosted confidence. - A steady increase in overall Reaper Force crew numbers has also improved confidence: this has been brought about by improved retention; Royal Australian Air Force exchange officers; and a pathway to using contractors to relieve Royal Air Force personnel at the deployed location. This gave more confidence that the 45 Reaper crews needed for Transition to Protector would be achieved by end 2020. Since the Q2 1920 (30th September 2019) Amber IPA DCA, the following non-project operating environment activities have impacted the original Q2 IPA DCA; - The RAF Phase 1, 2 and 3 training has been impacted by the restrictions imposed due to COVID-19. The effect on the Reaper Force crew numbers and, by extension, the transition to Protector is not yet clear. Since the Q2 1920 (30th September 2019) Amber IPA DCA, the following primary project actions have impacted the original Q2 IPA DCA; - DE&S will act as the Delivery Team for the Protector Infrastructure project at RAF Waddington. An exemption from using the Defence Infrastructure Organisation was granted in June 2019. The Protector facility project has been combined with that of E-7 Wedgetail, this has allowed for efficiencies of design by creating shared spaces and use of a joint contracting strategy. - The solution for the Synthetic Training System has been changed to ensure compliance and compatibility with Air's collective synthetic training programme. The impact to the programme cost and schedule are now understood and the amended solution will deliver an excellent capability. This item is still on the critical path but is now progressing. - A contract for crews for the Reaper Launch and Recovery Element based at the deployed location (known as UK1) will take effect in June 2020. This will allow up to seven RAF crews (21 people) to be relieved from the forward deployed location and return to home units, boosting the numbers of crews available for mission control towards the 45 that will be needed for transition to Protector.","startDate":"2009-04-30","endDate":"2035-03-31","scheduleNarrative":"The scheduled baseline project end date at Q2 1920 (30th September 2019) is 31/03/35, has not changed since last year's Q2 1819 date of 31/03/35, due primarily to the following factors; - baseline project end date did not change because this reflects the expected length of time that Protector will be in RAF service. - Baseline end date did not change because Protector is planned to be in RAF Service for 14.3 years after Initial Operating Capability is declared. Since the Q2 1920 (30th September 2019) baseline project end date of 31/03/35, the following primary project actions have impacted the original Q2 baseline project end date; - The programme was rebaselined following approval of a Review Note by IAC in April 2019 to reflect a slip to the Initial Operating Capability date. This has moved the end date to 31 Mar 2038. - The reporting has now been updated to show the re-baselined Out of Service Date of 31 Mar 2038, this is 14.3 years after the new Initial Operating Capability date of Nov 2023.","fyBaseline":127.37,"fyForecast":140.35,"fyVariance":10.0,"varianceNarrative":"The 19/20 in-year baseline / forecast variance at Q2 1920 (30th September 2019) of 10%, is due primarily to the following factors; - Unfavourable foreign exchange accounts for almost all of the In Year variance - A small variance in year was attributable to slightly increased costs in the Direct Commercial Sales Contract 1 that was signed in Aug 2019. Since the Q2 1920 (30th September 2019) 19/20 in-year baseline / forecast variance of 10%, the following non-project operating environment activities have impacted the original Q2 19/20 in-year baseline / forecast variance; - foreign exchange movements continue to change the variance. Since the Q2 1920 (30th September 2019) 19/20 in-year baseline / forecast variance of 10%, the following primary project actions have impacted the original Q2 19/20 in-year variance; - A small underspend in the Detect and Avoid Capability project was caused by a slower-than-forecast route to approvals for this new project that meant the funds could not be spent In Year.","wholeLifeCost":1155.84,"costNarrative":"The baseline Whole Life Cost at Q2 1920 (30th September 2019) is �1,155.84 m, has increased by �116.59 m since last year's Q2 1819 (�m) baseline Whole Life Cost of �1,039.25 m, due primarily to the following factors; - Increased Whole Life cost was caused when the Programme was rebaselined in April 2019 and was slipped by 28 months. This necessitated the renegotiation of contracts at a cost. This increase in cost was the subject of an Accounting Officers Assessment published in Nov 2019. - The rebaseline of the programme also allowed for the capability sustainment of the Multi-Spectral Targeting System from version B to version D in order to deliver the minimum Theatre standard and to manage obsolescence. This increased the Whole Life costs of the Programme. Since the Q2 1920 (30th September 2019) �1,155.84 m baseline Whole Life Cost, the following non-project operating environment activities have impacted the original baseline Q2 Whole Life Cost; - Foreign Exchange Rate (FOREX) US$ /UK� challenges have increased the forecast through life costs of the Programme.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Workforce & capability","Commercial & supply chain","Delivery & schedule"],"evidenceExcerpt":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber, which has improved since last year�s Q2 1819 Amber/Red, due primarily to the following factors; - The improved confidence is attributable to the re-baseline of the Programme and approval of the Review Note with adjusted Control Total by Investment Appraisal…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2020","sourceLabel":"IPA Annual Report 2019-20"},{"id":"MOD_0107_1617-Q1","year":2021,"name":"Protector","department":"MOD","category":"Military Capability","description":"Protector will provide a certified remotely piloted air system with enhanced capabilities (to 2038) over those currently provided by the in-service Reaper air system.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 26 of the Freedom of Information Act 2000 (Defence)","startDate":"2009-04-30","endDate":"2038-03-30","scheduleNarrative":"Compared to financial year 19/20-Q2, the project's end-date increased from 31 March 2035 to 30 March 2038 . This is primarily due to the following factors: The schedule remains on track to deliver an In Service Date in 2023 following the programme being re-baselined through approval of a Review Note in April 2019 to reflect a slip to the Initial Operating Capability date. This has moved the Out of Service Date to 31 Mar 2038.","fyBaseline":149.84,"fyForecast":154.85,"fyVariance":3.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":1347.06,"costNarrative":"Compared to financial year 19/20-Q2, the projects Baseline Whole Life Cost increased from �1155.84m to �1347.06m. This is primarily due to the following factors: Inclusion of Detect and Avoid, foreign exchange increases and extension of the Delivery Phase of the programme.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Exempt under Section 26 of the Freedom of Information Act 2000 (Defence) Compared to financial year 19/20-Q2, the project's end-date increased from 31 March 2035 to 30 March 2038 . This is primarily due to the following factors: The schedule remains on track to deliver an In Service Date in 2023 following the programme being re-baselined through approval of…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21"},{"id":"MOD_0107_1617-Q1","year":2022,"name":"PROTECTOR","department":"MOD","category":"Military Capability","description":"Protector will provide a certified remotely piloted air system with enhanced capabilities (to 2038) over those currently provided by the in-service Reaper air system. Protector will provide an armed, long range, persistent wide area surveillance with various sensors and be based at RAF Waddington in Lincolnshire.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating increased from Amber/Red to Amber. This is primarily due to the following factors. The removal of the incremental Amber/Green and Amber/Red assessment ratings. The Programme continues to work with its Defence Lines of Development, particularly within Equipment, Infrastructure and Information to progress towards the key milestones.","startDate":"2009-04-30","endDate":"2038-03-30","scheduleNarrative":"Compared to 2021-Q4, the project end-date remained scheduled to finish on 30 March 38. This is primarily due to the following factors:","fyBaseline":378.73,"fyForecast":285.31,"fyVariance":-24.0,"varianceNarrative":"The budget variance exceeds 5%. This is principally due to the following: Infrastructure re-profiling for Strategic Facility and Additional Single Living Accommodation, Fluctuations in Foreign Exchange Rates, Contractor driven re-profiling and review of management reserve, Removal of the Protector Detect and Avoid funding requirement.","wholeLifeCost":1517.0,"costNarrative":"Compared to 2021-Q4, the projects Baseline Whole Life Cost has increased by £170M (£1347.06M at Q4 20/21 and £1517.125M at Q4 21/22). This is primarily due to the following factors: The inclusion in the Control Total of the UK Strategic Command Protector Enhance costings and the change in the Full Operating Capability milestone date. The effect of the latter has been to draw more of the related support costs into the overall delivery element of the programme.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating increased from Amber/Red to Amber. This is primarily due to the following factors. The removal of the incremental Amber/Green and Amber/Red assessment ratings. The Programme continues to work with its Defence Lines of Development, particularly…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"MOD_0107_1617-Q1","year":2023,"name":"PROTECTOR","department":"MOD","category":"Military Capability","description":"Protector will provide a certified remotely piloted air system with enhanced capabilities (to 2038) over those currently provided by the in-service Reaper air system. Protector will provide an armed, long range, persistent wide area surveillance with various sensors and be based at RAF Waddington in Lincolnshire.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 21/22-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. Despite significant challenges, particularly relating to Equipment, Infrastructure and Information Defence Lines of Development, the Programme continues to manage risks and work through mitigations to progress towards the key milestones. However there are considerable increased costs for the planned Programme technical infrastructure at RAF Waddington. A contingency plan to deliver Initial Operating Capability utilising existing Infrastructure is underway and pending approval. Compounded with delays to critical software development, this has led to a delay in the Programme. In response, it is planned to re-baseline the Programme milestones and seek an increase to the Approved Budgetary Limit.","startDate":"2009-04-30","endDate":"2038-03-30","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2038-03-30. This is primarily due to the following factors. NA","fyBaseline":235.34,"fyForecast":241.84,"fyVariance":3.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":1345.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 decreased from 1517m. to 1345m. This is primarily due to the following factors. Removal of the costs for the Enhance Maritime element which is now accounted for separately.The Review Note for Protector that will re-baseline the Programme will capture, and fairly attribute cost growth as appropriate, to programmatic and macro-economic factors that have affected the delivery and affordability of the programme.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This programme does not report cashable benefits. Its aim is to provision the armed forces with the equipment and / or infrastructure required.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. Despite significant challenges, particularly relating to Equipment, Infrastructure and Information Defence Lines of Development, the Programme continues to manage risks and…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"MOD_0107_1617-Q1","year":2024,"name":"PROTECTOR","department":"MOD","category":"Military Capability","description":"Protector will provide a certified remotely piloted air system with enhanced capabilities (to 2040) over those currently provided by the inservice Reaper air system. Protector will provide armed, long range, persistent wide area surveillance with various sensors and be based at RAF Waddington in Lincolnshire.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure and Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 decreased from Amber to Red. This is primarily due to the following factors. Despite significant challenges, particularly relating to Equipment, Infrastructure and Information Defence Lines of Development, the Protector programme maintained its Amber Delivery Confidence Assessment and continued to manage risks and work through mitigations to progress towards the key milestones. Following the December 23 Gateway 0/4 (Strategic Assessment/Readiness for Service) Review, the Delivery Confidence has been moved to Red in response to a delay in receiving approval to re-baseline the Programme’s milestones and provides the route to Green.","startDate":"2009-04-30","endDate":"2026-06-30","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 decreased from 2038-03-30 to 2026-06-30. This is primarily due to the following factors. The programme previously reported the Out of Service Date as the project end date. In accordance with IPA guidance, the end date now reflects the point after Full Operating Capability (FOC) has been achieved and the Programme transferred to Business as Usual and graduated from the GMPP.","fyBaseline":222.82,"fyForecast":153.43,"fyVariance":-31.142,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. Slippage in both the Protector Main and Enhance Protector Programmes partially offset by FOREX adjustments against the main programme.","wholeLifeCost":1463.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 increased from 1345m to 1463m. This is primarily due to the following factors. This is primarily due to the following factors. The Review Note has captured and fairly attributed cost growth as appropriate, to programmatic and macro-economic factors that have affected the delivery and affordability of the Programme. Foreign Exchange Rate increases are a significant factor for the cost growth.","benefits":0.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 0m.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure and Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 decreased from Amber to Red. This is primarily due to the following factors. Despite significant challenges, particularly relating to Equipment, Infrastructure and Information Defence Lines of Development, the Protector programme…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"MOD_0107_1617-Q1","year":2025,"name":"PROTECTOR","department":"MoD","category":"Military Capability","description":"Protector will provide a certified Remotely Piloted Air System with enhanced capabilities (to 2040) over those currently provided by the in-service Reaper air system. Protector will provide armed, long range, persistent wide area surveillance with various sensors and be based at RAF Waddington in Lincolnshire.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at RED. This is primarily due to the following factors. Although Protector has received the financial approval required to achieve the Initial Operating Capability (Intelligence, Surveillance, and Reconnaissance) milestone later this year, the programme is awaiting approval for a Review Note which proposes a re-baselining of milestones and a route to a Green rating. Furthermore, workforce shortages and weapons testing delays are contributing to reduced Delivery Confidence.","startDate":"2009-04-30","endDate":"2026-06-30","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 30/06/2026. This is primarily due to the following factors. No change in project end-date.","fyBaseline":138.66,"fyForecast":87.57,"fyVariance":36.84,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. Significant underspend due to directed savings deferrals and spend commitment restrictions.","wholeLifeCost":1523.18,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 1463 to 1523. This is primarily due to the following factors. Foreign Exchange Rate increases, inflation, and the acceleration of future capability enhancements has resulted in an increase in the Programme’s costs for which an uplift in the Approved Budgetary Level is being sought.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at RED. This is primarily due to the following factors. Although Protector has received the financial approval required to achieve the Initial Operating Capability (Intelligence, Surveillance, and Reconnaissance) milestone later this year, the programme is…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"MOD_0107_1617-Q1","year":2026,"name":"PROTECTOR","department":"MOD","category":"Military Capability","description":"Protector will provide a certified Remotely Piloted Air System with enhanced capabilities (to 2040). Protector will provide armed, long range, persistent wide area surveillance with various sensors and be based at RAF Waddington in Lincolnshire.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Red. This is primarily due to the following factors. 1. Although Protector has received the financial approval required to achieve the Initial Operating Capability this year, the programme is awaiting approval for a Review Note which proposes a re-baselining of milestones and a route to a Green rating. 2. Furthermore, sufficiently trained crew numbers, Full Motion Video metadata dissemination issues and weapons testing delays are contributing to reduced Delivery Confidence.","startDate":"2009-04-30","endDate":"2030-06-30","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 30/06/2026. This is primarily due to the following factors. 1. Although the reported end date remains unchanged from Q4 24/25, the programme is awaiting approval for a Review Note which will revise all future milestones including the project end date.","fyBaseline":134.39,"fyForecast":89.51,"fyVariance":33.4,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors: 1. Significant underspend due to directed savings deferrals and spend commitment restrictions.","wholeLifeCost":1732.77,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) increased from £1523M to £1565M. This is primarily due to the following factors. 1. Protector Availability and Support Solution contract award and amendment of the budget numbers to reflect that. 2. Delays of Ground Support Equipment acquisition for in-service/IOC based on item lead times. 3. Reprofile of the Direct Commercial Sales 2 (DCS2) contract. 4.Costs increases driven by revised estimate of DCS2 for Rev E deliverables.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Approvals & decisions","Commercial & supply chain","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Red. This is primarily due to the following factors. 1. Although Protector has received the financial approval required to achieve the Initial Operating Capability this year, the programme is awaiting approval for a Review Note which…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"MOD_0107_1617-Q1","year":2025,"name":"PROTECTOR","department":"MoD","category":"Military Capability","description":"Protector will provide a certified Remotely Piloted Air System with enhanced capabilities (to 2040) over those currently provided by the in-service Reaper air system. Protector will provide armed, long range, persistent wide area surveillance with various sensors and be based at RAF Waddington in Lincolnshire.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at RED. This is primarily due to the following factors. Although Protector has received the financial approval required to achieve the Initial Operating Capability (Intelligence, Surveillance, and Reconnaissance) milestone later this year, the programme is awaiting approval for a Review Note which proposes a re-baselining of milestones and a route to a Green rating. Furthermore, workforce shortages and weapons testing delays are contributing to reduced Delivery Confidence.","startDate":"2009-04-30","endDate":"2026-06-30","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 30/06/2026. This is primarily due to the following factors. No change in project end-date.","fyBaseline":138.66,"fyForecast":87.57,"fyVariance":36.84,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. Significant underspend due to directed savings deferrals and spend commitment restrictions.","wholeLifeCost":1523.18,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 1463 to 1523. This is primarily due to the following factors. Foreign Exchange Rate increases, inflation, and the acceleration of future capability enhancements has resulted in an increase in the Programme’s costs for which an uplift in the Approved Budgetary Level is being sought.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at RED. This is primarily due to the following factors. Although Protector has received the financial approval required to achieve the Initial Operating Capability (Intelligence, Surveillance, and Reconnaissance) milestone later this year, the programme is…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":1461,"attentionScore":66,"attentionReasons":["Current published delivery confidence is Red","Published end date moved 1,461 days later","In-year forecast variance is +33.4%"]},{"id":"DFT_0038_1920-Q4","year":2026,"name":"EAST COAST DIGITAL PROGRAMME","department":"DFT","category":"Infrastructure and Construction","description":"The East Coast Digital Programme (ECDP) will implement the European Train Control System (ETCS) on 100 miles of the East Coast Mainline (ECML) between Kings Cross and Stoke Tunnel just south of Grantham, as well as on the Northern City Line (NCL) between Moorgate and Finsbury Park. The ECDP is the UK’s first implementation of ETCS on a mixed-use (freight and passenger trains) UK mainline route and will involve a major change in working practices for the rail industry. ETCS communicates signalling information into the driver’s cab in real-time, constantly updating how far ahead the train is authorised to move and providing optimal speed information. It removes the need for conventional lineside ‘traffic light’ signals, allowing for less-disruptive installation and maintenance. As well as having a lower whole life cost than conventional signals, ETCS on the NCL and the ECML will enhance operational resilience, is safer for passengers and rail workers, and has a 40% reduction in whole-life CO2 emissions through reduced use of materials compared to conventional signalling. ETCS also has the potential to unlock significant passenger and freight benefits through delivering an improvement in system capability of between 10 and 25%.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25-Q4, the National Infrastructure & Service Transformation Authority's Delivery Confidence Assessment rating at 25/26-Q4 is at RED. The NISTA review team noted that the partnership model continues to be the correct approach, and there have been positive changes in programme leadership. The review team highlighted that there is a need to re-baseline the programme, and that the programme is complex with several risks to delivery. They raised 19 recommendations to address. Recommendations include in the areas of ETCS freight train retrofitment, clearer accountabilities of leadership, and to continue the early identification of emerging risks to delivery.","startDate":"2017-05-01","endDate":"2030-10-14","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's baselined end-date at 25/26-Q4 remained at 14/10/2030. This date will be subject to a rebaseline exercise during 2026. The ECDP’s schedule has been set up to deliver ETCS on the ECML in a phased migration. The full migration to ETCS operations on the Northern City Line with the removal of conventional signals was achieved as planned in May 2025. In FY25/26, activities have focused on enabling works for the ETCS section on the ECML between Welwyn to Hitchin to provide a driver training area, due to enter into service August 2026. Works have included vehicle fitment, on-track testing and systems assurance. This milestone forecast has moved from December 2025 to August 2026, due to encountering challenges around system testing and assurance that will provide lessons for future ETCS schemes. The first mainline route section, originally due April 2027, is subject to change control as part of the rebaseline exercise.","fyBaseline":231.12,"fyForecast":194.42,"fyVariance":15.88,"varianceNarrative":"The budget variance exceeds 5%. This underspend is due to delays in contract awards and ETCS vehicle retrofitments, and less money has been spent on works for the renewals portion of ECDP (ie beyond Welwyn to Hitchin).","wholeLifeCost":3030.39,"costNarrative":"Compared to financial year 24/25-Q4, the programme's Whole Life Cost at 25/26-Q4 increased from £3,465m to £3,764m (in Nominal Prices). The programme anticipates that inflation will materialise as a key issue in the later years of the programme. As we move into the 2026-27 reporting cycle, the key risk to maintaining overall programme cost will be the cost of vehicle fitment and ETCS trackside infrastructure on the ECML. The programme is actively looking at how these costs can be managed whilst protecting the programme’s benefits. While delivery continues, ECDP is also maturing its delivery model to ensure it remains the enabler for future ETCS schemes.","benefits":1430.67,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed benefits at 25/26 Q4 remained at £2,783m (In Nominal £ Benefits). Benefits will be subject to a refresh during 2026. The benefits figure includes quantified performance, safety, socio-economic, environmental and wider economic monetised benefits.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 24/25-Q4, the National Infrastructure & Service Transformation Authority's Delivery Confidence Assessment rating at 25/26-Q4 is at RED. The NISTA review team noted that the partnership model continues to be the correct approach, and there have been positive changes in programme leadership. The review team highlighted that there is…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"DFT_0038_1920-Q4","year":2021,"name":"East Coast Digital Programme","department":"DFT","category":"Infrastructure and Construction","description":"The programme is seeking to bring about transformation through the introduction of digital technologies such as the European Train Control System; replacing conventional signalling with digital signalling on the East Coast Mainline South. This is the first mainline deployment of digital signalling and a critical pathfinder in the strategy to roll-out this technology across the whole rail network to provide a range of benefits such as increasing performance and lowering whole life costs.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber.This is primarily due to the following factors: The Department has a plan in place to address the resourcing issue and increase overall resourcing as the programme moves towards Full Business Case (FBC) submission and delivery. As the FBC is finalised, this will provide greater clarity about the migration strategy and costs and risks associated with the programme which will provide assurance on the programme schedule. Additionally, early works on the Northern City Line will test the programme partnership approach. The Department is working closely with Network Rail to ensure that the national enabler projects meet the requirements of the programme critical path. These will give us greater confidence in the deliverability of this programme.","startDate":"2017-05-01","endDate":"2029-12-31","scheduleNarrative":"The project end-date is 31 December 2029. This is primarily due to the following factors: This is a challenging project to retrofit digital signalling control systems to a highspeed mixed use line with a number of complex interfaces. Network Rail are taking forward this programme in a new way including through its approach to procurement and the establishment of a cross-industry board. Train fitment was deliberately started early to expose risks and challenges so that they can be tackled in time. Significant risks and challenges do remain, such as the national enabler projects. The Department, Network Rail and suppliers are working to resolve these so that they do not impact on the delivery of the programme. The planned schedule has been confirmed and is undergoing the proper assurance process as we finalise FBC. At this stage, we are confident that the programme partnership model and early industry engagement has delivered tangible results and, with the programme float reinstated, the programme can deliver to time and budget.","fyBaseline":120.52,"fyForecast":61.91,"fyVariance":-49.0,"varianceNarrative":"The budget variance exceeds 5%. At Outline Business Case (OBC), the First in Class Freight Fitment programme and the Rail Innovation & Development Centre project, which are enabler projects, were included in programme life costs. They have since been reprofiled and are now reported through Network Rail's Digital Railway programme, meaning they are not included in the forecast estimate. The variance also reflects some movement in infrastructure costs between years and increasing certainty in cost category expenditure amounts. Costs will become even more certain as the programme progresses to FBC and will be adjusted to reflect external funding pressures eg. Spending Review.","wholeLifeCost":2403.29,"costNarrative":"The projects Baseline Whole Life Cost is �2403.29m. This is primarily due to the following factors: The overall total Whole Life Cost (including inflation) between Control Period 6 (CP6) and Control Period 12 (CP12) for the East Coast Digital Programme is estimated to be between �2.98bn and �3.45bn in nominal figure including optimism bias. CP6/7 costs are estimated to be in the range of �1.2 - 1.9bn. These figures have been taken from the OBC Business Case. The forecast will be confirmed and refreshed at FBC.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Technical & integration"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber.This is primarily due to the following factors: The Department has a plan in place to address the resourcing issue and increase overall resourcing as the programme moves towards Full Business Case (FBC) submission and delivery. As the FBC is finalised, this will provide…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21"},{"id":"DFT_0038_1920-Q4","year":2022,"name":"East Coast Digital Programme","department":"DFT","category":"Infrastructure and Construction","description":"The East Coast Digital Programme will deliver improvements in railway operation through the introduction of European Train Control System technology on the East Coast Main Line. This digital signalling technology will replace expired conventional signalling infrastructure between Kings Cross and Stoke Tunnel south of Grantham. Digital signalling has a lower whole-life cost than conventional signalling and offers performance and capacity benefits to users not available through conventional line-side signalling.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 remained at Amber. Concerns still remain on issues related to fitment of European Train Control System (ETCS) technology on-board freight rolling stock and the development of the Rail Innovation & Development Centre (RIDC). Both are innovative and complex engineering challenges for the programme to overcome, resulting in the Amber rating. In the last quarter inflation risk to the programme has rapidly increased. The Programme is working with colleagues across DfT and Network Rail to develop a consistent approach to managing inflation risk, in recognition that it is not unique to the East Coast Digital Programme (ECDP). Following the Programme receiving a GREEN rating from the IPA at its Gateway 3 Review in October 2021 the Programme has addressed several recommendations and concerns in the report. This includes increasing resource levels on the Programme to fill all vacancies and the confirmation of freight commercial agreements with suppliers.","startDate":"2017-05-01","endDate":"2030-10-14","scheduleNarrative":"Compared to 2021-Q4, your project end-date increased from 31 DEC 2029 to 14 OCT 2030 . This is primarily due to the following factors: The 2021 Q4 project end-date was taken from the Programme's OBC. Since that time the Programme has developed and had its FBC approved in March 2022. The new project end date is at P80 confidence level and based on a greater understanding of Programme actions and requirements than at OBC. This is the project end date agreed in our Client Remit Letter with Network Rail.","fyBaseline":109.9,"fyForecast":109.9,"fyVariance":0.0,"varianceNarrative":"The GMPP project did not provide data","wholeLifeCost":3477.0,"costNarrative":"Compared to2021-Q4, the projects Baseline Whole Life Cost increased from 2403.29 (£m) to 3476.66 (£m). This is primarily due to the following factors: The 2021 Q4 baseline whole life cost was based on a range of figures given at OBC. The figures this quarter are FBC figures, but remain within the range given at OBC (£2.98-3.4bn). The FBC figures are more mature and reflect greater certainty of Programme costs compared to the OBC, with costs being based on contract values or quotes from industry.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Commercial & supply chain","Technical & integration","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 remained at Amber. Concerns still remain on issues related to fitment of European Train Control System (ETCS) technology on-board freight rolling stock and the development of the Rail Innovation & Development Centre (RIDC). Both are…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"DFT_0038_1920-Q4","year":2023,"name":"East Coast Digital Programme","department":"DFT","category":"Infrastructure and Construction","description":"The East Coast Digital Programme will introduce European Train Control System signalling technology to the East Coast Mainline southern section between Kings Cross & Stoke Tunnel just south of Grantham. This will involve the removal of conventional line-side traffic light signals and their replacement with digital signalling which will display safety information in the drivers cab. This is the first implementation of this technology on a UK mainline route, and will provide drivers with more information through the continuous communication between the train and track, allowing for greater safety and reliability.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber (SRO rating). This is primarily due to the following factors. The programme received an AMBER RAG rating at its annual Gateway 0 review held in September 2022. The review team recognised the unique and challenging nature of the programme and highlighted several key risks to delivery broadly focused on freight fitment, risk management and industrial relations. To support the successful delivery of the programme the review team provided 13 recommendations for ECDP to implement ahead of the next planned review in September 2023. Since the review 8 of the 13 recommendations have been implemented on the programme with a clear plan for the delivery of the remaining 5 ahead of the next review. Outstanding actions include the signature of freight business change agreements, launch of a programme intranet and marketing campaign, the holding of the annual QCRA risk review, publication of a refreshed programme mandate and an update to the programme benefits strategy. All 5 of these actions have an assigned owner and are tracked and reported on with an escalation route to the SRO.","startDate":"2017-05-01","endDate":"2030-10-14","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2030-10-14. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2030-10-14. This is primarily due to the following factors. The programme remains on schedule at the end of this reporting period. Since the last annual report a number of Tier 1 milestones have been achieved by the programme. This includes the commissioning into service of the interlocking system at Moorgate on the Northern City Line as well as the successful system proving of the ETCS system on the same branch line. However, delays continue on agreeing the signature of several major contracts which is putting significant pressure on programme schedule as we move into the next reporting period. In addition, the programme faces a major challenge in securing requisite additional engineering access over the coming year to make up for lost access over the last reporting period due to industrial action outside of the programmes control. Both of these factors bring a risk that over the next year programme schedule may move to reflect the delay to agreeing these contracts.","fyBaseline":222.0,"fyForecast":232.0,"fyVariance":5.0,"varianceNarrative":"The GMPP project did not provide data","wholeLifeCost":3477.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 remained at 3477m. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 remained at 3477m. This is primarily due to the following factors. At the end of the reporting period, programme who life costs have remained stable over the last year. Despite inflation remaining a key risk to the programme this has not yet materialised into higher whole life costs. However, as the programme moves into the next reporting period there remains a risk that cost will increase due to the challenge of securing sufficient engineering access to make up for delays caused by industrial action over the last year. Mitigations are being prepared by the programme, but the risk remains that this will cause significant additional cost to the programme.","benefits":826.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 826m. The programmes benefits profile has remained static compared to last reporting period. As the benefits of digital signalling start to materialise on the Northern City Line, the first area to transition to ETCS, the programme will begin monitoring there accrual in earnest over the coming year. To note, the monetised benefits figure is the discounted Net Present Benefit as set out in the FBC, and therefore not comparable to the Nominal whole life costs. This will be updated in the Q2 submission to IPA.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Technical & integration"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber (SRO rating). This is primarily due to the following factors. The programme received an AMBER RAG rating at its annual Gateway 0 review held in September 2022. The review team recognised the unique and challenging nature of the programme and…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"DFT_0038_1920-Q4","year":2024,"name":"East Coast Digital Programme","department":"DFT","category":"Infrastructure and Construction","description":"The East Coast Digital Programme will introduce European Train Control System signalling technology, also known as digital signalling, to the East Coast Mainline southern section between Kings Cross & Stoke Tunnel just south of Grantham. This will involve the removal of conventional line-side traffic light signals and their replacement with digital signalling which will display safety information in the driver's cab. _x000D_ _x000D_ As well as being cheaper on a whole-life basis, implementing the technology will provide a number of additional benefits unavailable under convention signals such as improved safety and efficiency as it provides drivers with more information through the continuous communication between the train and track. This is the first implementation of this technology on a UK mainline route and as well as being a significant engineering challenge, it will also involve a major change in working practices for industry.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The programme received an AMBER rating at its annual review held in September 2023. The reviewers praised the unique and innovative approach to delivery used on the programme and the engagement of delivery partners in its output. In addition, they also highlighted several risks to delivery which required attention by the team. This included for example improved communication with stakeholders over delivery plans and ensuring key personnel and skills are retained. In order to address these challenges the review team provided 12 recommendations for ECDP to implement ahead of the next planned review in October 2024. Since the review 8 of the 12 recommendations have been implemented on the programme with a clear plan for the delivery of the remaining 4 ahead of the next review. Notable changes delivered via these recommendations include an update to the programme delivery model, improved ED&I monitoring as well as changes to reporting.","startDate":"2017-05-01","endDate":"2030-10-14","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2030-10-14. This is primarily due to the following factors. Final programme completion remains on schedule as at the end of the reporting year. Since the last annual report a number of Tier 1 milestones have been achieved by the programme including the entry into service of the ETCS testing facility at the Rail Innovation and Development Centre where all ETCS fitted trains will be tested and the commissioning of ETCS infrastructure on the Welwyn to Hitchin Overlay Area, where conventional signals will be retained to allow the progressive training of drivers. In addition to these Tier 1 milestones, the 2023-24 reporting year also saw both the running of ETCS trains and the start of mass-driver training for the first time on the Northern City Line. However, despite overall programme completion remaining on schedule there has been delays to several intermediate milestones over this reporting year. This includes for example milestones related to vehicle fitment and infrastructure commissioning. These delays have primarily been driven by loss of access to the railway to complete infrastructure works and constraints in the supply chain","fyBaseline":352.34,"fyForecast":297.99,"fyVariance":-15.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The variance from the forecast of costs is broadly down to three factors which has moved spend into later years. Firstly, the impact of industrial action in 2022 led to delays in infrastructure delivery between Welwyn and Hitchin the first area on the mainline to have digital signalling infrastructure fitted, causing a consequential delay to the Key Outcome 1 milestone which covers the removal of signals on this stretch of line resulting in costs slipping to the right. In addition, delays to freight fitment and approvals caused by the complexity of the engineering challenge have also pushed spend to later in the programme. The final factor moving spend to the right has been delays to agreeing the contract for the fitment of the Class 80X fleet, which delayed the start of this project and hence moving costs to later in the programme lifecycle.","wholeLifeCost":3477.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 remained at 3477m. This is primarily due to the following factors. At the end of the reporting year, programme whole life costs have remained stable since the last annual report. Despite inflation remaining a key risk to the programme this has not yet materialised into higher whole life costs through use of contingency and leveraging commercial tools such as bulk purchase of materials to gain cost savings. As we move in the 2024-25 reporting cycle, the key risk to maintaining overall programme cost will be the affordability of fleet fitment within the freight and OTM sectors. The programme is actively looking at how it can reduce cost in these sectors through working with the sector.","benefits":824.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 2324-Q4 decreased from 826m. to 824m. The programme's benefits profile has remained static compared to last reporting period. As the benefits of digital signalling start to materialise on the Northern City Line, the first area to transition to ETCS, the programme will begin monitoring there accrual in earnest over the coming year. Please note that the benefits reported here are in present value at 2010 prices, whereas whole lifecycle costs are in cash prices, so are not directly comparable.","themes":["Delivery & schedule","Cost & funding","Commercial & supply chain","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The programme received an AMBER rating at its annual review held in September 2023. The reviewers praised the unique and innovative approach to delivery used on the programme…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"DFT_0038_1920-Q4","year":2025,"name":"EAST COAST DIGITAL PROGRAMME","department":"DfT","category":"Infrastructure and Construction","description":"The East Coast Digital Programme (ECDP) will implement the European Train Control System (ETCS) on 100 miles of the East Coast Mainline (ECML) between Kings Cross and Stoke Tunnel just south of Grantham, as well as on the Northern City Line (NCL) between Moorgate and Finsbury Park. The ECDP is the UK’s first implementation of ETCS on a mixed used UK mainline route and will involve a major change in working practices for the rail industry. ETCS communicates signalling information into the driver’s cab in real-time, constantly updating how far ahead the train is authorised to move and providing optimal speed information. It removes the need for conventional lineside ‘traffic light’ signals, allowing for less-disruptive installation and maintenance. As well as having a lower whole life cost than conventional signals, ETCS on the NCL and the ECML will enhance operational resilience, is even safer for passengers and rail workers, and has a 40% reduction in whole-life CO2 emissions. ETCS also has the potential to unlock significant passenger and freight benefits through delivering an improvement in system capability of between 10 and 25%.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The IPA review team recognised the complexity of the programme, highlighting the technical challenge and a complex stakeholder environment. It praised the programme’s overall approach to managing this complexity, highlighting the success of the programme’s partnership model and strong capability across key resources. The review team highlighted several risks to delivery and raised 17 recommendations to address this. This included ensuring the ECDP is set up optimally to manage the systems integration challenge, ensuring that the ECDP has the right governance and processes to resolve key issues, and developing the programme’s approach to retrofitting freight locomotives with ETCS. The review team’s recommendations have been accepted with clear time-bound actions identified to ensure they are addressed. Notable changes include significant updates to ECDP’s operating model, governance and management information.","startDate":"2017-05-01","endDate":"2030-10-14","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 14/10/2030. This is primarily due to the following factors‚ The ECDP’s schedule has been set up to deliver ETCS on the ECML and the NCL in a phased migration. In FY24/25, activities have focused on delivering the first phases of this migration. This includes the full migration to ETCS operation on the NCL due May 2025 (achieved), as well as the implementation of an ETCS overlay on the ECML between Welwyn to Hitchin to provide a driver training area, due December 2025. Good progress was made in these activities in FY24/25. The NCL was successfully migrated to 100% ETCS operation with the conventional “traffic light” signals removed in May 2025, a significant programme milestone. Various enabling works have also been completed for the ETCS overlay between Welwyn to Hitchin. This includes infrastructure commissioning, progressive systems assurance, vehicle fitment, and on track testing. As such, this milestone has maintained its forecast for the next financial year, although some delivery pressures have been acknowledged. The programme’s end date remains unchanged at 14/10/2030. This end date is dependent on the programme’s approach to the later migration phases. No changes to the baseline of these dates were made in FY24/25 but this is currently under review. This review seeks to assess the impact of potential changes to ECDP’s funding profile and learnings from the first phases of migration.","fyBaseline":365.2,"fyForecast":271.8,"fyVariance":25.58,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The variance from the original budget baseline is broadly down to four factors. Contract award assurance for the delivery of ETCS infrastructure between Welwyn and Hitchin led to a delay, resulting in a reduction of the forecast FY24/25 spend. Funding for the ETCS fitment of the Class 800s was transferred to the DfT from the ECDP, as DfT held the existing commercial relationships with the related train operators and suppliers. Spend for the fitment of On Track Machine’s (OTM) and associated business change activities was deferred from FY24/25 due to delays in the required contract awards. Finally, funding for the delivery of ETCS trackside infrastructure was deferred from FY24/25 due to a reduction in Network Rail’s Eastern Region funding.","wholeLifeCost":3465.4,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 3477 to 3465. This is primarily due to the following factors‚ Programme whole life costs have remained stable since the last annual report. Despite inflation remaining a key risk to the programme this has not yet materialised into higher whole life costs through use of contingency, leveraging commercial tools, and a programme wide efficiencies campaign. As we move into the 2025-26 reporting cycle, the key risk to maintaining overall programme cost will be the cost vehicle fitment and the cost of ETCS trackside infrastructure on the ECML. The programme is actively looking at how these costs can be managed whilst protecting the programme’s benefits.","benefits":2783.1,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 824 to 2783. This is primarily due to the following factors‚ The benefits reporting methodology has been revised this year to align with how costs are reported. Previously ECDP benefits have been reported in 2011 prices. This has now been replaced with the nominal value. There has been no change in the ECDP's like for like monetised benefits in the last year. The benefits figure includes quantified performance, safety, socio-economic, environmental and wider economic monetised benefits.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Technical & integration"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The IPA review team recognised the complexity of the programme, highlighting the technical challenge and a complex stakeholder environment. It praised the programme’s…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"DFT_0038_1920-Q4","year":2026,"name":"EAST COAST DIGITAL PROGRAMME","department":"DFT","category":"Infrastructure and Construction","description":"The East Coast Digital Programme (ECDP) will implement the European Train Control System (ETCS) on 100 miles of the East Coast Mainline (ECML) between Kings Cross and Stoke Tunnel just south of Grantham, as well as on the Northern City Line (NCL) between Moorgate and Finsbury Park. The ECDP is the UK’s first implementation of ETCS on a mixed-use (freight and passenger trains) UK mainline route and will involve a major change in working practices for the rail industry. ETCS communicates signalling information into the driver’s cab in real-time, constantly updating how far ahead the train is authorised to move and providing optimal speed information. It removes the need for conventional lineside ‘traffic light’ signals, allowing for less-disruptive installation and maintenance. As well as having a lower whole life cost than conventional signals, ETCS on the NCL and the ECML will enhance operational resilience, is safer for passengers and rail workers, and has a 40% reduction in whole-life CO2 emissions through reduced use of materials compared to conventional signalling. ETCS also has the potential to unlock significant passenger and freight benefits through delivering an improvement in system capability of between 10 and 25%.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25-Q4, the National Infrastructure & Service Transformation Authority's Delivery Confidence Assessment rating at 25/26-Q4 is at RED. The NISTA review team noted that the partnership model continues to be the correct approach, and there have been positive changes in programme leadership. The review team highlighted that there is a need to re-baseline the programme, and that the programme is complex with several risks to delivery. They raised 19 recommendations to address. Recommendations include in the areas of ETCS freight train retrofitment, clearer accountabilities of leadership, and to continue the early identification of emerging risks to delivery.","startDate":"2017-05-01","endDate":"2030-10-14","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's baselined end-date at 25/26-Q4 remained at 14/10/2030. This date will be subject to a rebaseline exercise during 2026. The ECDP’s schedule has been set up to deliver ETCS on the ECML in a phased migration. The full migration to ETCS operations on the Northern City Line with the removal of conventional signals was achieved as planned in May 2025. In FY25/26, activities have focused on enabling works for the ETCS section on the ECML between Welwyn to Hitchin to provide a driver training area, due to enter into service August 2026. Works have included vehicle fitment, on-track testing and systems assurance. This milestone forecast has moved from December 2025 to August 2026, due to encountering challenges around system testing and assurance that will provide lessons for future ETCS schemes. The first mainline route section, originally due April 2027, is subject to change control as part of the rebaseline exercise.","fyBaseline":231.12,"fyForecast":194.42,"fyVariance":15.88,"varianceNarrative":"The budget variance exceeds 5%. This underspend is due to delays in contract awards and ETCS vehicle retrofitments, and less money has been spent on works for the renewals portion of ECDP (ie beyond Welwyn to Hitchin).","wholeLifeCost":3030.39,"costNarrative":"Compared to financial year 24/25-Q4, the programme's Whole Life Cost at 25/26-Q4 increased from £3,465m to £3,764m (in Nominal Prices). The programme anticipates that inflation will materialise as a key issue in the later years of the programme. As we move into the 2026-27 reporting cycle, the key risk to maintaining overall programme cost will be the cost of vehicle fitment and ETCS trackside infrastructure on the ECML. The programme is actively looking at how these costs can be managed whilst protecting the programme’s benefits. While delivery continues, ECDP is also maturing its delivery model to ensure it remains the enabler for future ETCS schemes.","benefits":1430.67,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed benefits at 25/26 Q4 remained at £2,783m (In Nominal £ Benefits). Benefits will be subject to a refresh during 2026. The benefits figure includes quantified performance, safety, socio-economic, environmental and wider economic monetised benefits.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 24/25-Q4, the National Infrastructure & Service Transformation Authority's Delivery Confidence Assessment rating at 25/26-Q4 is at RED. The NISTA review team noted that the partnership model continues to be the correct approach, and there have been positive changes in programme leadership. The review team highlighted that there is…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"DFT_0038_1920-Q4","year":2025,"name":"EAST COAST DIGITAL PROGRAMME","department":"DfT","category":"Infrastructure and Construction","description":"The East Coast Digital Programme (ECDP) will implement the European Train Control System (ETCS) on 100 miles of the East Coast Mainline (ECML) between Kings Cross and Stoke Tunnel just south of Grantham, as well as on the Northern City Line (NCL) between Moorgate and Finsbury Park. The ECDP is the UK’s first implementation of ETCS on a mixed used UK mainline route and will involve a major change in working practices for the rail industry. ETCS communicates signalling information into the driver’s cab in real-time, constantly updating how far ahead the train is authorised to move and providing optimal speed information. It removes the need for conventional lineside ‘traffic light’ signals, allowing for less-disruptive installation and maintenance. As well as having a lower whole life cost than conventional signals, ETCS on the NCL and the ECML will enhance operational resilience, is even safer for passengers and rail workers, and has a 40% reduction in whole-life CO2 emissions. ETCS also has the potential to unlock significant passenger and freight benefits through delivering an improvement in system capability of between 10 and 25%.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The IPA review team recognised the complexity of the programme, highlighting the technical challenge and a complex stakeholder environment. It praised the programme’s overall approach to managing this complexity, highlighting the success of the programme’s partnership model and strong capability across key resources. The review team highlighted several risks to delivery and raised 17 recommendations to address this. This included ensuring the ECDP is set up optimally to manage the systems integration challenge, ensuring that the ECDP has the right governance and processes to resolve key issues, and developing the programme’s approach to retrofitting freight locomotives with ETCS. The review team’s recommendations have been accepted with clear time-bound actions identified to ensure they are addressed. Notable changes include significant updates to ECDP’s operating model, governance and management information.","startDate":"2017-05-01","endDate":"2030-10-14","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 14/10/2030. This is primarily due to the following factors‚ The ECDP’s schedule has been set up to deliver ETCS on the ECML and the NCL in a phased migration. In FY24/25, activities have focused on delivering the first phases of this migration. This includes the full migration to ETCS operation on the NCL due May 2025 (achieved), as well as the implementation of an ETCS overlay on the ECML between Welwyn to Hitchin to provide a driver training area, due December 2025. Good progress was made in these activities in FY24/25. The NCL was successfully migrated to 100% ETCS operation with the conventional “traffic light” signals removed in May 2025, a significant programme milestone. Various enabling works have also been completed for the ETCS overlay between Welwyn to Hitchin. This includes infrastructure commissioning, progressive systems assurance, vehicle fitment, and on track testing. As such, this milestone has maintained its forecast for the next financial year, although some delivery pressures have been acknowledged. The programme’s end date remains unchanged at 14/10/2030. This end date is dependent on the programme’s approach to the later migration phases. No changes to the baseline of these dates were made in FY24/25 but this is currently under review. This review seeks to assess the impact of potential changes to ECDP’s funding profile and learnings from the first phases of migration.","fyBaseline":365.2,"fyForecast":271.8,"fyVariance":25.58,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The variance from the original budget baseline is broadly down to four factors. Contract award assurance for the delivery of ETCS infrastructure between Welwyn and Hitchin led to a delay, resulting in a reduction of the forecast FY24/25 spend. Funding for the ETCS fitment of the Class 800s was transferred to the DfT from the ECDP, as DfT held the existing commercial relationships with the related train operators and suppliers. Spend for the fitment of On Track Machine’s (OTM) and associated business change activities was deferred from FY24/25 due to delays in the required contract awards. Finally, funding for the delivery of ETCS trackside infrastructure was deferred from FY24/25 due to a reduction in Network Rail’s Eastern Region funding.","wholeLifeCost":3465.4,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 3477 to 3465. This is primarily due to the following factors‚ Programme whole life costs have remained stable since the last annual report. Despite inflation remaining a key risk to the programme this has not yet materialised into higher whole life costs through use of contingency, leveraging commercial tools, and a programme wide efficiencies campaign. As we move into the 2025-26 reporting cycle, the key risk to maintaining overall programme cost will be the cost vehicle fitment and the cost of ETCS trackside infrastructure on the ECML. The programme is actively looking at how these costs can be managed whilst protecting the programme’s benefits.","benefits":2783.1,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 824 to 2783. This is primarily due to the following factors‚ The benefits reporting methodology has been revised this year to align with how costs are reported. Previously ECDP benefits have been reported in 2011 prices. This has now been replaced with the nominal value. There has been no change in the ECDP's like for like monetised benefits in the last year. The benefits figure includes quantified performance, safety, socio-economic, environmental and wider economic monetised benefits.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Technical & integration"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The IPA review team recognised the complexity of the programme, highlighting the technical challenge and a complex stakeholder environment. It praised the programme’s…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":1,"transition":"Worsened","endDateDeltaDays":0,"attentionScore":65,"attentionReasons":["Current published delivery confidence is Red","Published rating worsened from Amber to Red","In-year forecast variance is +15.9%"]},{"id":"BEIS_0079_2122-Q4","year":2026,"name":"MATRIX CLUSTER TRANSFORMATION PROGRAMME","department":"DSIT","category":"Government Transformation and Service Delivery","description":"The Matrix Programme seeks to implement the Government Shared Service Strategy for nine government departments by modernising and consolidating back-office systems and services. This will include delivery of a new shared business process service (BPS), a combined enterprise resource planning (ERP) system including ancillary technologies, and a change in ways of working for all users.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Matrix Programme is rated Red, reflecting a number of material issues identified through a planned Stage Gate that impact delivery confidence. These include Stage Gate 1 Readiness issues, notably unmet End‑to‑End Cycle 1 Entry Criteria. Data protection and information assurance risks were also identified, with some data segments having been unintentionally visible and therefore formal entry of the test phase could not take place. This gave rise to the need to rebaseline delivery plans. The Matrix Programme Board met on 26 March to consider the case for re‑baselining the programme. Replanning is intended to establish a more realistic, credible, and achievable forward plan in response to ongoing delivery challenges. Current emerging analysis indicates a delay of 3-6 months, which would move the Phase 1a user go‑live to late 2026. Proposed mitigations centre on alongside structured scenario planning to assess a new plan. A defined set of actions is underway to support an informed decision on revised go‑live dates at the Programme Board in May. System issues have now been resolved and this May date will enable us to assess test progress too. The single biggest risk to this is Depts being unable to find functional SME capacity to undertake the high level of testing they have identified as being required, given their low risk appetite. Notwithstanding the above, there has been tangible progress. Data migration activity is focused on improving data quality ahead of the final migration cycle, thereby reducing risk to subsequent testing and assurance. Core design configuration is now largely complete, with remaining exceptions tightly governed. End‑to‑end testing capacity and execution have improved through a revised testing approach, prioritisation of payroll‑critical scenarios, and the introduction of additional centrally cleared testing support. Mitigations are also being applied across wider design, readiness, and change activity. An iterative delivery approach is enabling service design, change impact assessment, and training needs analysis to progress in line with incremental design maturity. A programme‑level Training Strategy has been agreed and baselined, with further refinement underway as training requirements are confirmed. In parallel, early engagement with UKSBS on the delivery of training for Phase 1a professional users is strengthening delivery resilience and continuity. There remains a significant dependency risk associated with alignment to Shared Services for Government (SSfG) initiatives. The Programme’s ability to deliver agreed time, cost, and quality outcomes is, in part, dependent on SSfG decisions and delivery that sit outside the Programme’s direct control. This continues to represent a material risk to delivery confidence and reinforces the importance of a realistic and evidence‑based rebaseline. There is a significant risk associated with the Pension provider's inability to confirm when end to end pension integration will be able to take place. There was positive progress in March, when Programme Business Case 3 (PBC3) received HM Treasury approval for 2026–27, subject to six conditions. This provides a confirmed funding baseline while work proceeds on the PBC3 addendum (PBC3a), which will seek approval for funding beyond 2027 following re‑baselining. Overall, the current period is focused on embedding mitigations, strengthening delivery assurance and controls, and agreeing a credible and achievable rebaseline that supports informed decision‑making on revised go‑live dates and improves confidence in the Programme’s delivery trajectory.","startDate":"2022-04-01","endDate":"2027-11-27","scheduleNarrative":"Since the programme plan and associated critical path were baselined in October 2024 with Phase 1a Go Live scheduled for May 2026 and subsequent phased go lives planned ahead of the programme end date of 30 November 2026, the programme has experienced delays primarily driven by Stage Gate 1 Readiness issues, including delays in achieving End to End Cycle 1 entry criteria. In response, the Matrix Programme Board met on 26/3/26 to consider the case for re baselining the programme, including the development of a rectification plan and the consideration of several planning scenarios.","fyBaseline":122.55,"fyForecast":115.95,"fyVariance":5.38,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to slippage in the system integrator milestones to FY26/27.","wholeLifeCost":889.81,"costNarrative":"Compared to FY24/25 Q4, the project's agreed Whole Life Cost at FY25/26 Q4 has changed due to development of a new programme business case, PBC3. Whole life costs at PBC3 include Departmental baselines and Programme resource costs, transformation, and service integrator over a 15-year appraisal period.","benefits":337.11,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) increased from last year's £373m to this years £405m: The previous submission was the PBC2 Addendum. As a result there have been changes across categories: - Reporting changes: PBC3 includes updated baselines of costs and benefits, and efficiency estimates - Design changes: The progression of service design has informed this update - Non-political scope changes: There have been updates to user numbers; some additional disbenefits identified, etc. N.B. Disbenefits are captured within the efficiency estimates, and are not quantified separately. As a result, the reporting shows net benefits.","themes":["Delivery & schedule","Technical & integration","Cost & funding","Scope & requirements"],"evidenceExcerpt":"The Matrix Programme is rated Red, reflecting a number of material issues identified through a planned Stage Gate that impact delivery confidence. These include Stage Gate 1 Readiness issues, notably unmet End‑to‑End Cycle 1 Entry Criteria. Data protection and information assurance risks were also identified, with some data segments having been…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"BEIS_0079_2122-Q4","year":2023,"name":"Matrix Cluster Transformation Programme","department":"DSIT","category":"Government Transformation and Service Delivery","description":"The Matrix Programme seeks to implement the Government Shared Service Strategy for eight government departments by modernising and consolidating back-office systems and services. This will include delivery of a new shared business process service (BPS), a combined enterprise resource planning (ERP) system including ancillary technologies, and a change in ways of working for all users.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","startDate":null,"endDate":null,"scheduleNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","themes":["Commercial & supply chain"],"evidenceExcerpt":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests. Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"BEIS_0079_2122-Q4","year":2024,"name":"Matrix Cluster Transformation Programme","department":"DSIT","category":"Government Transformation and Service Delivery","description":"","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","startDate":null,"endDate":null,"scheduleNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","themes":["Commercial & supply chain"],"evidenceExcerpt":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests. Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"BEIS_0079_2122-Q4","year":2025,"name":"MATRIX CLUSTER TRANSFORMATION PROGRAMME","department":"DSIT","category":"Government Transformation and Service Delivery","description":"The Matrix Transformation Programme seeks to implement the Government Shared Service Strategy for eight government departments by modernising and consolidating back-office systems and services. This will include delivery of a new shared business process service (BPS), a combined enterprise resource planning (ERP) system including ancillary technologies, and a change in ways of working for all users.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER. The programme’s overall progress and performance remained on track, with concerns being manageable well and delivery generally proceeding as planned. However, there had some delays, which including receiving and finalising volumetrics and benefits baselining data. There was a positive development with contracts secured for external support to assist with these assessments. The Change Impact Assessments (CIAs) were expected to inform the development of the Economic Model for Programme Business Case v3 (PBCv3). While the programme had sufficient information to begin PBCv3 discussions, lessons learned had to be applied to ensure future data commissions would be delivered on time. Alongside system configuration, the team mapped to where activities and tasks for new services would sit, enabling the completion of CIAs in time for PBCv3. Re-planning efforts had been undertaken to resolve conflicts and reduce risks related to decision-making and data returns. These risks did not threaten the go-live date, but required careful management to avoid placing pressure on the PBCv3 approval timeline in September 2025.","startDate":"2022-04-01","endDate":"2027-11-30","scheduleNarrative":"The project's end-date at 24/25-Q4 is scheduled to be 30/11/2027. This is primarily due to the following factors‚ The programme plan and associated critical path were baselined in October 2024 with Phase 1a go-live planned for May 2026, with subsequent phased go-lives ahead of programme end date on 30/11/2027. Factors influencing this schedule include the successful selection of a technology solution and appointment of a technology partner, appointment of a service provider and service implementation and transformation partners. These have now been done and delivery risk focuses on closing out the design phase by end of July 2025, resolving conflicts between the shared services strategy and the interoperability strategy, managing the level of change departments are undertaking when stability is needed and any impacts of the future years SR settlement.","fyBaseline":48.24,"fyForecast":51.0,"fyVariance":5.72,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The budget variance is marginally over the 5% tolerance, at 5.4%, the main variance was driven by changes in transition costs from external service providers.","wholeLifeCost":938.0,"costNarrative":"The project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) is 938. This is primarily due to the following factors‚ Whole life costs are unchanged over the period and encompass 15-year appraisal period. Whole life costs include Departmental baselines and Programme resource costs, transformation, and service integrator.","benefits":373.0,"benefitsNarrative":"The project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) is 373. This is primarily due to the following factors‚ The Matrix Transformation Programme has identified a range of benefits realised from the new shared services operating model, driven by automation, self-service, and changes to the way of working from adopting Workday best practices. These included: (1) Cash-releasing efficiency benefits. Reduction in spending due to system improvements and process alignment, allowing for more efficient practices, e.g., reduced spend on contingent labour due to improved skill management. (2) Non-cash-releasing time and Productivity benefits. Direct reduction in staff time required to complete processes, freeing up that time for reallocation to other value-adding tasks. (3) Net Run cost reductions, Reducing operational costs, e.g. due to decreased license costs. (4) Non-Cash Releasing, FTE Efficiencies: Direct reduction in staff time required to complete processes, decreasing the FTE required for that process area.","themes":["Delivery & schedule","Cost & funding","Technical & integration","Approvals & decisions"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER. The programme’s overall progress and performance remained on track, with concerns being manageable well and delivery generally proceeding as planned. However, there had some delays, which including receiving and finalising volumetrics and benefits baselining…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"BEIS_0079_2122-Q4","year":2026,"name":"MATRIX CLUSTER TRANSFORMATION PROGRAMME","department":"DSIT","category":"Government Transformation and Service Delivery","description":"The Matrix Programme seeks to implement the Government Shared Service Strategy for nine government departments by modernising and consolidating back-office systems and services. This will include delivery of a new shared business process service (BPS), a combined enterprise resource planning (ERP) system including ancillary technologies, and a change in ways of working for all users.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Matrix Programme is rated Red, reflecting a number of material issues identified through a planned Stage Gate that impact delivery confidence. These include Stage Gate 1 Readiness issues, notably unmet End‑to‑End Cycle 1 Entry Criteria. Data protection and information assurance risks were also identified, with some data segments having been unintentionally visible and therefore formal entry of the test phase could not take place. This gave rise to the need to rebaseline delivery plans. The Matrix Programme Board met on 26 March to consider the case for re‑baselining the programme. Replanning is intended to establish a more realistic, credible, and achievable forward plan in response to ongoing delivery challenges. Current emerging analysis indicates a delay of 3-6 months, which would move the Phase 1a user go‑live to late 2026. Proposed mitigations centre on alongside structured scenario planning to assess a new plan. A defined set of actions is underway to support an informed decision on revised go‑live dates at the Programme Board in May. System issues have now been resolved and this May date will enable us to assess test progress too. The single biggest risk to this is Depts being unable to find functional SME capacity to undertake the high level of testing they have identified as being required, given their low risk appetite. Notwithstanding the above, there has been tangible progress. Data migration activity is focused on improving data quality ahead of the final migration cycle, thereby reducing risk to subsequent testing and assurance. Core design configuration is now largely complete, with remaining exceptions tightly governed. End‑to‑end testing capacity and execution have improved through a revised testing approach, prioritisation of payroll‑critical scenarios, and the introduction of additional centrally cleared testing support. Mitigations are also being applied across wider design, readiness, and change activity. An iterative delivery approach is enabling service design, change impact assessment, and training needs analysis to progress in line with incremental design maturity. A programme‑level Training Strategy has been agreed and baselined, with further refinement underway as training requirements are confirmed. In parallel, early engagement with UKSBS on the delivery of training for Phase 1a professional users is strengthening delivery resilience and continuity. There remains a significant dependency risk associated with alignment to Shared Services for Government (SSfG) initiatives. The Programme’s ability to deliver agreed time, cost, and quality outcomes is, in part, dependent on SSfG decisions and delivery that sit outside the Programme’s direct control. This continues to represent a material risk to delivery confidence and reinforces the importance of a realistic and evidence‑based rebaseline. There is a significant risk associated with the Pension provider's inability to confirm when end to end pension integration will be able to take place. There was positive progress in March, when Programme Business Case 3 (PBC3) received HM Treasury approval for 2026–27, subject to six conditions. This provides a confirmed funding baseline while work proceeds on the PBC3 addendum (PBC3a), which will seek approval for funding beyond 2027 following re‑baselining. Overall, the current period is focused on embedding mitigations, strengthening delivery assurance and controls, and agreeing a credible and achievable rebaseline that supports informed decision‑making on revised go‑live dates and improves confidence in the Programme’s delivery trajectory.","startDate":"2022-04-01","endDate":"2027-11-27","scheduleNarrative":"Since the programme plan and associated critical path were baselined in October 2024 with Phase 1a Go Live scheduled for May 2026 and subsequent phased go lives planned ahead of the programme end date of 30 November 2026, the programme has experienced delays primarily driven by Stage Gate 1 Readiness issues, including delays in achieving End to End Cycle 1 entry criteria. In response, the Matrix Programme Board met on 26/3/26 to consider the case for re baselining the programme, including the development of a rectification plan and the consideration of several planning scenarios.","fyBaseline":122.55,"fyForecast":115.95,"fyVariance":5.38,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to slippage in the system integrator milestones to FY26/27.","wholeLifeCost":889.81,"costNarrative":"Compared to FY24/25 Q4, the project's agreed Whole Life Cost at FY25/26 Q4 has changed due to development of a new programme business case, PBC3. Whole life costs at PBC3 include Departmental baselines and Programme resource costs, transformation, and service integrator over a 15-year appraisal period.","benefits":337.11,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) increased from last year's £373m to this years £405m: The previous submission was the PBC2 Addendum. As a result there have been changes across categories: - Reporting changes: PBC3 includes updated baselines of costs and benefits, and efficiency estimates - Design changes: The progression of service design has informed this update - Non-political scope changes: There have been updates to user numbers; some additional disbenefits identified, etc. N.B. Disbenefits are captured within the efficiency estimates, and are not quantified separately. As a result, the reporting shows net benefits.","themes":["Delivery & schedule","Technical & integration","Cost & funding","Scope & requirements"],"evidenceExcerpt":"The Matrix Programme is rated Red, reflecting a number of material issues identified through a planned Stage Gate that impact delivery confidence. These include Stage Gate 1 Readiness issues, notably unmet End‑to‑End Cycle 1 Entry Criteria. Data protection and information assurance risks were also identified, with some data segments having been…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"BEIS_0079_2122-Q4","year":2025,"name":"MATRIX CLUSTER TRANSFORMATION PROGRAMME","department":"DSIT","category":"Government Transformation and Service Delivery","description":"The Matrix Transformation Programme seeks to implement the Government Shared Service Strategy for eight government departments by modernising and consolidating back-office systems and services. This will include delivery of a new shared business process service (BPS), a combined enterprise resource planning (ERP) system including ancillary technologies, and a change in ways of working for all users.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER. The programme’s overall progress and performance remained on track, with concerns being manageable well and delivery generally proceeding as planned. However, there had some delays, which including receiving and finalising volumetrics and benefits baselining data. There was a positive development with contracts secured for external support to assist with these assessments. The Change Impact Assessments (CIAs) were expected to inform the development of the Economic Model for Programme Business Case v3 (PBCv3). While the programme had sufficient information to begin PBCv3 discussions, lessons learned had to be applied to ensure future data commissions would be delivered on time. Alongside system configuration, the team mapped to where activities and tasks for new services would sit, enabling the completion of CIAs in time for PBCv3. Re-planning efforts had been undertaken to resolve conflicts and reduce risks related to decision-making and data returns. These risks did not threaten the go-live date, but required careful management to avoid placing pressure on the PBCv3 approval timeline in September 2025.","startDate":"2022-04-01","endDate":"2027-11-30","scheduleNarrative":"The project's end-date at 24/25-Q4 is scheduled to be 30/11/2027. This is primarily due to the following factors‚ The programme plan and associated critical path were baselined in October 2024 with Phase 1a go-live planned for May 2026, with subsequent phased go-lives ahead of programme end date on 30/11/2027. Factors influencing this schedule include the successful selection of a technology solution and appointment of a technology partner, appointment of a service provider and service implementation and transformation partners. These have now been done and delivery risk focuses on closing out the design phase by end of July 2025, resolving conflicts between the shared services strategy and the interoperability strategy, managing the level of change departments are undertaking when stability is needed and any impacts of the future years SR settlement.","fyBaseline":48.24,"fyForecast":51.0,"fyVariance":5.72,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The budget variance is marginally over the 5% tolerance, at 5.4%, the main variance was driven by changes in transition costs from external service providers.","wholeLifeCost":938.0,"costNarrative":"The project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) is 938. This is primarily due to the following factors‚ Whole life costs are unchanged over the period and encompass 15-year appraisal period. Whole life costs include Departmental baselines and Programme resource costs, transformation, and service integrator.","benefits":373.0,"benefitsNarrative":"The project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) is 373. This is primarily due to the following factors‚ The Matrix Transformation Programme has identified a range of benefits realised from the new shared services operating model, driven by automation, self-service, and changes to the way of working from adopting Workday best practices. These included: (1) Cash-releasing efficiency benefits. Reduction in spending due to system improvements and process alignment, allowing for more efficient practices, e.g., reduced spend on contingent labour due to improved skill management. (2) Non-cash-releasing time and Productivity benefits. Direct reduction in staff time required to complete processes, freeing up that time for reallocation to other value-adding tasks. (3) Net Run cost reductions, Reducing operational costs, e.g. due to decreased license costs. (4) Non-Cash Releasing, FTE Efficiencies: Direct reduction in staff time required to complete processes, decreasing the FTE required for that process area.","themes":["Delivery & schedule","Cost & funding","Technical & integration","Approvals & decisions"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER. The programme’s overall progress and performance remained on track, with concerns being manageable well and delivery generally proceeding as planned. However, there had some delays, which including receiving and finalising volumetrics and benefits baselining…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":1,"transition":"Worsened","endDateDeltaDays":-3,"attentionScore":62,"attentionReasons":["Current published delivery confidence is Red","Published rating worsened from Amber to Red","In-year forecast variance is +5.4%"]},{"id":"DLUHC_0250_2324-Q1","year":2026,"name":"Remediation Portfolio","department":"MHCLG","category":"Infrastructure and Construction","description":"The Remediation Portfolio’s overarching strategic objective is to bring all buildings over 11 metres affected by unsafe cladding up to the minimum life-safety standard quickly, completely, proportionately and consistently. Its objectives are to identify all affected buildings, remediate them at pace and ensure those responsible pay, thereby protecting the taxpayer. These objectives are underpinned by four operating principles: supporting residents, remediating to the right standards, delivering value for money and taking a risk-based approach. Remediation funding above the Government’s capped £5.15bn contribution will be recouped from industry.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"While delivery is set to accelerate, with more buildings expected to start remediation during this Parliament than prior to 2024/25, the SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 decreased to Red. This reflects risks to pace and affordability which are constraining delivery against planned timelines, including higher-than-anticipated social housing volumes, Building Safety Regulator constraints impacting progression of works, the need to accelerate delivery through developers and anticipated construction cost inflation. As a result, delivery against the Remediation Acceleration Plan and within the 2025 Full Business Case assumptions remains challenging. Targeted action is underway, including increasing Gateway 2 throughput, strengthening delivery planning with social sector partners, and working with developers to improve pace. Developer cost recovery activity is progressing, alongside preparations for the Building Safety Levy launch (October 2026). As of March 2026, 4,322 buildings over 11 metres have been identified with unsafe cladding, representing an estimated 50–76% of all buildings that will require remediation as part of MHCLG’s remediation programmes. For the 4,322 buildings identified with unsafe cladding, remediation has started on 2,399, including 1,531 that have been completed and 868 now on site. A further 1,923 buildings are in the programme but have not yet started on site.","startDate":"2023-06-26","endDate":"2036-03-31","scheduleNarrative":"There has been no change to the schedule for the programme.","fyBaseline":887.64,"fyForecast":840.58,"fyVariance":5.3,"varianceNarrative":"The CDEL 25/26 budget variance exceeds 5%. Underspends were predominantly driven by the ACM programme, where key milestones were not achieved in time for costs to be recognised by year end. These underspends reflect delivery slippage rather than savings and are expected to be incurred in future financial years.","wholeLifeCost":9726.6,"costNarrative":"The WLC has increased by £104m following the Spending Review outcome and adjustments for inflation in real terms. This update includes a lower estimated number of buildings but higher per building costs, which has slightly increased the estimate.","benefits":null,"benefitsNarrative":"Exempt under Section 22 - Information intended for future publication","themes":["Delivery & schedule","Cost & funding","Commercial & supply chain","Approvals & decisions"],"evidenceExcerpt":"While delivery is set to accelerate, with more buildings expected to start remediation during this Parliament than prior to 2024/25, the SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 decreased to Red. This reflects risks to pace and affordability which are constraining delivery against planned timelines, including higher-than-anticipated…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"DLUHC_0250_2324-Q1","year":2024,"name":"Remediation Portfolio","department":"DLUHC","category":"Infrastructure and Construction","description":"The overarching aim of the portfolio is to oversee the remediation of residential buildings 11 metres and over in height with unsafe external wall systems through five building safety programmes, and to bring them up to the minimum life-safety standard.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. As at March 24: We continue to assess the delivery confidence of the programme as amber._x000D_ _x000D_ The programme continues to focus on the IPA recommendations to maintain delivery confidence in addressing unsafe cladding remediation.","startDate":"2023-06-26","endDate":"2036-03-31","scheduleNarrative":"The project's end-date at 23/24-Q4 is 2036-03-31. This is primarily due to the following factors. As at March 24: The project's end-date is March 2036.","fyBaseline":732.0,"fyForecast":676.49,"fyVariance":-8.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The variance relates to lower than expected RDEL costs due to delays in recruitment.","wholeLifeCost":9915.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 23/24-Q4 is 9915m. This is primarily due to the following factors. Whole Life Costs have not changed.","benefits":6748.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 6748m. The project's departmental-agree monetised benefits at 23/24-Q4 is 6748m.","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. As at March 24: We continue to assess the delivery confidence of the programme as amber._x000D_ _x000D_ The programme continues to focus on the IPA recommendations to maintain delivery confidence in addressing…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"DLUHC_0250_2324-Q1","year":2025,"name":"Remediation Portfolio","department":"MHCLG","category":"Infrastructure and Construction","description":"The Remediation Portfolio’s overarching strategic objective is to bring all affected buildings over 11 metres with unsafe cladding up to the minimum life-safety standard quickly, completely, proportionately, and consistently. The objectives of the portfolio are to: fix buildings at pace, identify all affected buildings with unsafe cladding and ensure those responsible pay and protect the taxpayer. These objectives work with a set of four operating principles: support residents, deliver remediation to the right standards, deliver value for money and ensure remediation takes a risk-based approach. All funding for remediating buildings, over the Government’s capped £5.15bn contribution, will be recouped from industry.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Delivery confidence remains amber due to the need to accelerate the pace of remediation, progress developer debt recovery and implement the Building Safety Levy. As of April 2025, there are 5,052 residential buildings 11 metres and over in height identified with unsafe cladding with 1652 having completed remediation works. Identification of 11–18m buildings requiring remediation is continuing, with over 500 more 11-18m buildings monitored compared to a year ago. The portfolio has published performance targets and is delivering its Remediation Acceleration Plan, with a public update on progress and further interventions expected following the 2025 Spending Review this summer.","startDate":"2023-06-26","endDate":"2036-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2036. This is primarily due to the following factors‚ The end date remains at 31/03/203.","fyBaseline":517.3,"fyForecast":437.7,"fyVariance":15.39,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ There is underspend due to social/private sector costs in the Aluminium Composite Material (ACM) programme being reduced caused by late building completions and lower than expected starts in the Building Safety Fund (BSF) programme. Additional underspend due to staff costs savings in the ACM and BSF programmes, programme delays and supporting functions paying out less than expected for enforcement grants and lower legal costs.","wholeLifeCost":9915.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 9915. This is primarily due to the following factors‚ The modelled whole life cost of the portfolio has not been updated in this report due to uncertainty surrounding the Spending Review outcome. This forecast will be updated once the Spending Review outcome has been confirmed.","benefits":null,"benefitsNarrative":"Section 22 - Information intended for future publication","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Delivery confidence remains amber due to the need to accelerate the pace of remediation, progress developer debt recovery and implement the Building Safety Levy. As…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"DLUHC_0250_2324-Q1","year":2026,"name":"Remediation Portfolio","department":"MHCLG","category":"Infrastructure and Construction","description":"The Remediation Portfolio’s overarching strategic objective is to bring all buildings over 11 metres affected by unsafe cladding up to the minimum life-safety standard quickly, completely, proportionately and consistently. Its objectives are to identify all affected buildings, remediate them at pace and ensure those responsible pay, thereby protecting the taxpayer. These objectives are underpinned by four operating principles: supporting residents, remediating to the right standards, delivering value for money and taking a risk-based approach. Remediation funding above the Government’s capped £5.15bn contribution will be recouped from industry.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"While delivery is set to accelerate, with more buildings expected to start remediation during this Parliament than prior to 2024/25, the SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 decreased to Red. This reflects risks to pace and affordability which are constraining delivery against planned timelines, including higher-than-anticipated social housing volumes, Building Safety Regulator constraints impacting progression of works, the need to accelerate delivery through developers and anticipated construction cost inflation. As a result, delivery against the Remediation Acceleration Plan and within the 2025 Full Business Case assumptions remains challenging. Targeted action is underway, including increasing Gateway 2 throughput, strengthening delivery planning with social sector partners, and working with developers to improve pace. Developer cost recovery activity is progressing, alongside preparations for the Building Safety Levy launch (October 2026). As of March 2026, 4,322 buildings over 11 metres have been identified with unsafe cladding, representing an estimated 50–76% of all buildings that will require remediation as part of MHCLG’s remediation programmes. For the 4,322 buildings identified with unsafe cladding, remediation has started on 2,399, including 1,531 that have been completed and 868 now on site. A further 1,923 buildings are in the programme but have not yet started on site.","startDate":"2023-06-26","endDate":"2036-03-31","scheduleNarrative":"There has been no change to the schedule for the programme.","fyBaseline":887.64,"fyForecast":840.58,"fyVariance":5.3,"varianceNarrative":"The CDEL 25/26 budget variance exceeds 5%. Underspends were predominantly driven by the ACM programme, where key milestones were not achieved in time for costs to be recognised by year end. These underspends reflect delivery slippage rather than savings and are expected to be incurred in future financial years.","wholeLifeCost":9726.6,"costNarrative":"The WLC has increased by £104m following the Spending Review outcome and adjustments for inflation in real terms. This update includes a lower estimated number of buildings but higher per building costs, which has slightly increased the estimate.","benefits":null,"benefitsNarrative":"Exempt under Section 22 - Information intended for future publication","themes":["Delivery & schedule","Cost & funding","Commercial & supply chain","Approvals & decisions"],"evidenceExcerpt":"While delivery is set to accelerate, with more buildings expected to start remediation during this Parliament than prior to 2024/25, the SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 decreased to Red. This reflects risks to pace and affordability which are constraining delivery against planned timelines, including higher-than-anticipated…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"DLUHC_0250_2324-Q1","year":2025,"name":"Remediation Portfolio","department":"MHCLG","category":"Infrastructure and Construction","description":"The Remediation Portfolio’s overarching strategic objective is to bring all affected buildings over 11 metres with unsafe cladding up to the minimum life-safety standard quickly, completely, proportionately, and consistently. The objectives of the portfolio are to: fix buildings at pace, identify all affected buildings with unsafe cladding and ensure those responsible pay and protect the taxpayer. These objectives work with a set of four operating principles: support residents, deliver remediation to the right standards, deliver value for money and ensure remediation takes a risk-based approach. All funding for remediating buildings, over the Government’s capped £5.15bn contribution, will be recouped from industry.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Delivery confidence remains amber due to the need to accelerate the pace of remediation, progress developer debt recovery and implement the Building Safety Levy. As of April 2025, there are 5,052 residential buildings 11 metres and over in height identified with unsafe cladding with 1652 having completed remediation works. Identification of 11–18m buildings requiring remediation is continuing, with over 500 more 11-18m buildings monitored compared to a year ago. The portfolio has published performance targets and is delivering its Remediation Acceleration Plan, with a public update on progress and further interventions expected following the 2025 Spending Review this summer.","startDate":"2023-06-26","endDate":"2036-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2036. This is primarily due to the following factors‚ The end date remains at 31/03/203.","fyBaseline":517.3,"fyForecast":437.7,"fyVariance":15.39,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ There is underspend due to social/private sector costs in the Aluminium Composite Material (ACM) programme being reduced caused by late building completions and lower than expected starts in the Building Safety Fund (BSF) programme. Additional underspend due to staff costs savings in the ACM and BSF programmes, programme delays and supporting functions paying out less than expected for enforcement grants and lower legal costs.","wholeLifeCost":9915.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 9915. This is primarily due to the following factors‚ The modelled whole life cost of the portfolio has not been updated in this report due to uncertainty surrounding the Spending Review outcome. This forecast will be updated once the Spending Review outcome has been confirmed.","benefits":null,"benefitsNarrative":"Section 22 - Information intended for future publication","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Delivery confidence remains amber due to the need to accelerate the pace of remediation, progress developer debt recovery and implement the Building Safety Levy. As…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":1,"transition":"Worsened","endDateDeltaDays":0,"attentionScore":62,"attentionReasons":["Current published delivery confidence is Red","Published rating worsened from Amber to Red","In-year forecast variance is +5.3%"]},{"id":"DEFRA_0348_2324-Q4","year":2026,"name":"Livestock Information Transformation Programme","department":"DEFRA","category":"Government Transformation and Service Delivery","description":"The Livestock Information Transformation Programme (LITP) will replace multiple existing outdated tracing systems with a single, modern digital multi-species service. This service is essential to harness data to help protect English and UK food security, international trade, consumer confidence and prevent disruption to the farming industry. The programme will also deliver wider transformational effect across the livestock industry, through the exploitation of accurate data, subsequently promoting growth, improving efficiency and driving higher standards across the sector. These data opportunities will support transformation in the agriculture sector and will deliver government and industry-wide benefits. Upon completion of the programme's work, there will be a new multi-species system for tracing livestock, replacing existing legacy systems, using a cloud-based approach. Registration will be clearer and less complicated, the accessibility of services will be refined and will subsequently reduce errors and accelerate reporting, providing a better experience for keepers and the livestock industry. Users will be able to manage animal movements more coherently, and animal health and welfare will be improved through a UK View of livestock information.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25, the NISTA/SRO Delivery Confidence Assessment rating at 25/26 decreased to Red. Path to green plan approved by Ministers on 12 May 26.","startDate":null,"endDate":null,"scheduleNarrative":"Compared to financial year 24/25-Q4, the projects end date at 23/26 remained the same. This date is however subject to change due to replanning and path to green plan being refined.","fyBaseline":65.2,"fyForecast":63.77,"fyVariance":2.18,"varianceNarrative":"The budget variance is less than 5%","wholeLifeCost":525.5,"costNarrative":"Compared to financial year 24/25 - Q4, the projects departmentally agreed Whole Life Cost at 25/26-Q4 remained at £546,650","benefits":null,"benefitsNarrative":"Compared to the 2024/25 yearly return the projected departmentally agreed and quantified benefits have decreased from £107.8m to £56m. This is primarily due to refinement of economic modelling for programme business case 2. Since the OBC there has been significant progress in refining the approach to appraising the benefits of the preferred option. These changes, which were made to ensure the modelling is suitably robust, have caused benefits outputs to reduce since previous report. Changes include: Refinement of disease management modelling for ASF and FMD, complete redevelopment of BEID and efficiencies modelling, and removal of some existing monetised benefits where evidence was not sufficiently robust. The quantified benefits associated with LITP are predominantly comprised of disease management, industry efficiency, and government efficiency benefits over a 10 year appraisal period. Disease management benefits quantify the avoided economic losses associated with improved government disease response, driven by faster and more accurate traceability data. Quantified benefits are considered to be a significant underestimate of the true value of the programme: disease management benefits are only quantified for two diseases; other benefits are not quantified due to data limitations, for example the avoided cost of current system failure; and there are significant enabled benefits unlocked for other programmes which are not reflected in this analysis.","themes":["Cost & funding","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25, the NISTA/SRO Delivery Confidence Assessment rating at 25/26 decreased to Red. Path to green plan approved by Ministers on 12 May 26. Compared to financial year 24/25-Q4, the projects end date at 23/26 remained the same. This date is however subject to change due to replanning and path to green plan being refined.","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"DEFRA_0348_2324-Q4","year":2025,"name":"Livestock Information Transformation Programme","department":"DEFRA","category":"Government Transformation and Service Delivery","description":"The Livestock Information Transformation Programme (LITP) will replace multiple existing outdated tracing systems with a single, modern digital multi-species service. This service is essential to harness data to help protect English and UK food security, international trade, consumer confidence and prevent disruption to the farming industry. The programme will also deliver wider transformational effect across the livestock industry, through the exploitation of accurate data, subsequently promoting growth, improving efficiency and driving higher standards across the sector. These data opportunities will support transformation in the agriculture sector and will deliver government and industry-wide benefits. Upon completion of the programme’s work, there will be a new multi-species system for tracing livestock, replacing existing legacy systems, using a cloud-based approach. Registration will be clearer and less complicated, the accessibility of services will be refined and will subsequently reduce errors and accelerate reporting, providing a better experience for keepers and the livestock industry. Users will be able to manage animal movements more coherently, and animal health and welfare will be improved through a UK View of livestock information.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER. This is due to‚ LITPs overall delivery confidence remains AMBER. Recent and significant changes in delivery approach, planning, assurance and governance are starting to bear fruit, leading to increasing levels of confidence. Progress on core platform delivery remains on track for phased Beta roll-out starting in December 2025. The impending ministerial decision on eartag frequency in England will boost industry confidence and assist with legislative implementation. DA relationships continue to improve, with imminent key decisions on the Wales Multispecies system go-live informing LITP rollout strategy and timelines. Scotland have indicated that they would look to introduce Ultra-High Frequency technology for eartag identification and a ministerial announcement is expected soon. From a programme perspective, we will need to work through the implications of this at both a technical and legislative level to ensure that, regardless of eartag frequency, cross-border moves are dealt with coherently and a consistent UK View of movements is maintained. Implications arising from the ongoing EU SPS ‘dynamic alignment’ negotiations will also need to considered. New financial management arrangements are being implemented that are providing us with greater levels of assurance and control. Endorsement of our new delivery and business planning approach by Investment Committee has given us the mandate to push forward at pace. The draft first phase Programme Business Case is on track to start the assurance and approvals journey at LITP Programme Board in June. Work continues on the delivery of actions to address the recommendations outlined in the Chief Project Delivery Officer's internal review of the programme and the valuable guidance and insights provided by an independent NISTA associate. Further external assurance will be undertaken via the NISTA Gateway review scheduled for w/c 30 June. We continue to engage with ministers who have acknowledged the criticality of the programme, delivering on the original scope while meeting the direction to reduce costs later in the SR period. Setting up work with Core Defra to explore options around future asset control and data ownership that will be taken forward in the next year ahead.","startDate":"2022-01-25","endDate":null,"scheduleNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","fyBaseline":67.19,"fyForecast":72.4,"fyVariance":7.75,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ Funds brought forward from 26/27 to 24/25 for work on Mobile App and Graph technology for the Livestock Information Platform.","wholeLifeCost":478.08,"costNarrative":"The project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) is 478. This is primarily due to the following factors‚ This comprises Livestock Information Transformation Programme costs to replace existing outdated multi-species livestock tracing systems with a modern digital service, replacing existing legacy systems, using a cloud-based approach. This covers resource and capital costs for programme running costs, development and implementation of new IT digital services. This is as per captured in the Outline Business Case.","benefits":107.82,"benefitsNarrative":"The project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) is 107. This is primarily due to the following factors‚ The quantified benefits associated with the livestock information transformation programme (LITP) are predominantly comprised of disease management, industry efficiency, and government efficiency benefits over a 10 year appraisal period. Disease management benefits quantify the avoided economic losses associated with improved government disease response, driven by faster and more accurate traceability data. Quantified benefits are considered to be a significant underestimate of the true value of the programme: disease management benefits are only quantified for two diseases; other benefits are not quantified due to data limitations, for example the avoided cost of current system failure; and there are significant enabled benefits unlocked for other programmes which are not reflected in this analysis. Benefits analysis has been updated since the 24/25-Q4 return, latest figures will be reflected in the next commission.","themes":["Delivery & schedule","Governance & assurance","Technical & integration","Cost & funding"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER. This is due to‚ LITPs overall delivery confidence remains AMBER. Recent and significant changes in delivery approach, planning, assurance and governance are starting to bear fruit, leading to increasing levels of confidence. Progress on core platform delivery…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"DEFRA_0348_2324-Q4","year":2026,"name":"Livestock Information Transformation Programme","department":"DEFRA","category":"Government Transformation and Service Delivery","description":"The Livestock Information Transformation Programme (LITP) will replace multiple existing outdated tracing systems with a single, modern digital multi-species service. This service is essential to harness data to help protect English and UK food security, international trade, consumer confidence and prevent disruption to the farming industry. The programme will also deliver wider transformational effect across the livestock industry, through the exploitation of accurate data, subsequently promoting growth, improving efficiency and driving higher standards across the sector. These data opportunities will support transformation in the agriculture sector and will deliver government and industry-wide benefits. Upon completion of the programme's work, there will be a new multi-species system for tracing livestock, replacing existing legacy systems, using a cloud-based approach. Registration will be clearer and less complicated, the accessibility of services will be refined and will subsequently reduce errors and accelerate reporting, providing a better experience for keepers and the livestock industry. Users will be able to manage animal movements more coherently, and animal health and welfare will be improved through a UK View of livestock information.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25, the NISTA/SRO Delivery Confidence Assessment rating at 25/26 decreased to Red. Path to green plan approved by Ministers on 12 May 26.","startDate":null,"endDate":null,"scheduleNarrative":"Compared to financial year 24/25-Q4, the projects end date at 23/26 remained the same. This date is however subject to change due to replanning and path to green plan being refined.","fyBaseline":65.2,"fyForecast":63.77,"fyVariance":2.18,"varianceNarrative":"The budget variance is less than 5%","wholeLifeCost":525.5,"costNarrative":"Compared to financial year 24/25 - Q4, the projects departmentally agreed Whole Life Cost at 25/26-Q4 remained at £546,650","benefits":null,"benefitsNarrative":"Compared to the 2024/25 yearly return the projected departmentally agreed and quantified benefits have decreased from £107.8m to £56m. This is primarily due to refinement of economic modelling for programme business case 2. Since the OBC there has been significant progress in refining the approach to appraising the benefits of the preferred option. These changes, which were made to ensure the modelling is suitably robust, have caused benefits outputs to reduce since previous report. Changes include: Refinement of disease management modelling for ASF and FMD, complete redevelopment of BEID and efficiencies modelling, and removal of some existing monetised benefits where evidence was not sufficiently robust. The quantified benefits associated with LITP are predominantly comprised of disease management, industry efficiency, and government efficiency benefits over a 10 year appraisal period. Disease management benefits quantify the avoided economic losses associated with improved government disease response, driven by faster and more accurate traceability data. Quantified benefits are considered to be a significant underestimate of the true value of the programme: disease management benefits are only quantified for two diseases; other benefits are not quantified due to data limitations, for example the avoided cost of current system failure; and there are significant enabled benefits unlocked for other programmes which are not reflected in this analysis.","themes":["Cost & funding","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25, the NISTA/SRO Delivery Confidence Assessment rating at 25/26 decreased to Red. Path to green plan approved by Ministers on 12 May 26. Compared to financial year 24/25-Q4, the projects end date at 23/26 remained the same. This date is however subject to change due to replanning and path to green plan being refined.","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"DEFRA_0348_2324-Q4","year":2025,"name":"Livestock Information Transformation Programme","department":"DEFRA","category":"Government Transformation and Service Delivery","description":"The Livestock Information Transformation Programme (LITP) will replace multiple existing outdated tracing systems with a single, modern digital multi-species service. This service is essential to harness data to help protect English and UK food security, international trade, consumer confidence and prevent disruption to the farming industry. The programme will also deliver wider transformational effect across the livestock industry, through the exploitation of accurate data, subsequently promoting growth, improving efficiency and driving higher standards across the sector. These data opportunities will support transformation in the agriculture sector and will deliver government and industry-wide benefits. Upon completion of the programme’s work, there will be a new multi-species system for tracing livestock, replacing existing legacy systems, using a cloud-based approach. Registration will be clearer and less complicated, the accessibility of services will be refined and will subsequently reduce errors and accelerate reporting, providing a better experience for keepers and the livestock industry. Users will be able to manage animal movements more coherently, and animal health and welfare will be improved through a UK View of livestock information.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER. This is due to‚ LITPs overall delivery confidence remains AMBER. Recent and significant changes in delivery approach, planning, assurance and governance are starting to bear fruit, leading to increasing levels of confidence. Progress on core platform delivery remains on track for phased Beta roll-out starting in December 2025. The impending ministerial decision on eartag frequency in England will boost industry confidence and assist with legislative implementation. DA relationships continue to improve, with imminent key decisions on the Wales Multispecies system go-live informing LITP rollout strategy and timelines. Scotland have indicated that they would look to introduce Ultra-High Frequency technology for eartag identification and a ministerial announcement is expected soon. From a programme perspective, we will need to work through the implications of this at both a technical and legislative level to ensure that, regardless of eartag frequency, cross-border moves are dealt with coherently and a consistent UK View of movements is maintained. Implications arising from the ongoing EU SPS ‘dynamic alignment’ negotiations will also need to considered. New financial management arrangements are being implemented that are providing us with greater levels of assurance and control. Endorsement of our new delivery and business planning approach by Investment Committee has given us the mandate to push forward at pace. The draft first phase Programme Business Case is on track to start the assurance and approvals journey at LITP Programme Board in June. Work continues on the delivery of actions to address the recommendations outlined in the Chief Project Delivery Officer's internal review of the programme and the valuable guidance and insights provided by an independent NISTA associate. Further external assurance will be undertaken via the NISTA Gateway review scheduled for w/c 30 June. We continue to engage with ministers who have acknowledged the criticality of the programme, delivering on the original scope while meeting the direction to reduce costs later in the SR period. Setting up work with Core Defra to explore options around future asset control and data ownership that will be taken forward in the next year ahead.","startDate":"2022-01-25","endDate":null,"scheduleNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","fyBaseline":67.19,"fyForecast":72.4,"fyVariance":7.75,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ Funds brought forward from 26/27 to 24/25 for work on Mobile App and Graph technology for the Livestock Information Platform.","wholeLifeCost":478.08,"costNarrative":"The project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) is 478. This is primarily due to the following factors‚ This comprises Livestock Information Transformation Programme costs to replace existing outdated multi-species livestock tracing systems with a modern digital service, replacing existing legacy systems, using a cloud-based approach. This covers resource and capital costs for programme running costs, development and implementation of new IT digital services. This is as per captured in the Outline Business Case.","benefits":107.82,"benefitsNarrative":"The project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) is 107. This is primarily due to the following factors‚ The quantified benefits associated with the livestock information transformation programme (LITP) are predominantly comprised of disease management, industry efficiency, and government efficiency benefits over a 10 year appraisal period. Disease management benefits quantify the avoided economic losses associated with improved government disease response, driven by faster and more accurate traceability data. Quantified benefits are considered to be a significant underestimate of the true value of the programme: disease management benefits are only quantified for two diseases; other benefits are not quantified due to data limitations, for example the avoided cost of current system failure; and there are significant enabled benefits unlocked for other programmes which are not reflected in this analysis. Benefits analysis has been updated since the 24/25-Q4 return, latest figures will be reflected in the next commission.","themes":["Delivery & schedule","Governance & assurance","Technical & integration","Cost & funding"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER. This is due to‚ LITPs overall delivery confidence remains AMBER. Recent and significant changes in delivery approach, planning, assurance and governance are starting to bear fruit, leading to increasing levels of confidence. Progress on core platform delivery…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":1,"transition":"Worsened","endDateDeltaDays":null,"attentionScore":60,"attentionReasons":["Current published delivery confidence is Red","Published rating worsened from Amber to Red"]},{"id":"MOD_0320_2324-Q3","year":2026,"name":"MULTI ROLE STRIKE SHIP","department":"MOD","category":"Military Capability","description":"The Programme will provide Littoral Lift Capabilities to replace the current ageing mixed fleet of amphibious vessels in the early 2030s, as well as potentially performing additional roles currently conducted by other warships and auxiliaries. These vessels will enable the projection of littoral strike capability worldwide and ensure that a modernised amphibious capability is available to the Commando Force.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 decreased to Red. This is primarily due to the following factors. 1. Following submission of the Outline Business Case to the Navy Investment Decision Panel, the decision was taken for a Programme pause and reset, to await the formal outcomes of the Defence Investment Plan and to determine the best approach to delivering the littoral lift capability within a reduced budgetary total. 2. The change to the Programme Total Cost, and Defence Investment Plan uncertainty has lead to a Red assessment.","startDate":"2024-04-01","endDate":"2040-01-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 31/01/2040. The programme will be reset during FY26.","fyBaseline":11.2,"fyForecast":null,"fyVariance":null,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. 1. The Variance between budget and forecast in the current year and future years is subject to a programme reset and re-baselined IOC date.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Approvals & decisions","Scope & requirements","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 decreased to Red. This is primarily due to the following factors. 1. Following submission of the Outline Business Case to the Navy Investment Decision Panel, the decision was taken for a Programme pause and reset, to await the formal outcomes of the…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"MOD_0320_2324-Q3","year":2024,"name":"Multi Role Support Ship","department":"MOD","category":"Military Capability","description":"The Multi-Role Support Ship (MRSS) programme will replace the current ageing mixed fleet of amphibious vessels in the early 2030s, as well as potentially performing additional roles currently conducted by other warships and auxiliaries. These vessels will enable the projection of littoral strike capability worldwide and ensure that a modernised amphibious capability is available to the Commando Force. The MRSS capability will be persistently engaged as Littoral Response Groups operating in both the Indo Pacific and Euro Atlantic regions, and will be ready to aggregate to form a larger Littoral Strike Group or be combined with a Carrier Task Group to form an Expeditionary Strike Force.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. The scale, complexity and challenge of the Programme. The Programme was established in 2023 and is currently moving from the concept to assessment phase. The programme team are undertaking evidence gathering in order to make decisions around the route to commercial competition.","startDate":"2023-07-01","endDate":"2040-01-31","scheduleNarrative":"The project's end-date at 23/24-Q4 is 2040-01-31. This is primarily due to the following factors. With scope and solution design still to be finalised, the full cost model and schedule is still to be finalised.","fyBaseline":1.0,"fyForecast":1.0,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.)","benefits":0.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 0m.","themes":["Commercial & supply chain","Cost & funding","Delivery & schedule","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. The scale, complexity and challenge of the Programme. The Programme was established in 2023 and is currently moving from the concept to assessment phase. The programme team are…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"MOD_0320_2324-Q3","year":2025,"name":"MULTI ROLE STRIKE SHIP","department":"MoD","category":"Military Capability","description":"The Multi-Role Strike Ship (MRSS) programme will replace the current ageing mixed fleet of amphibious vessels in the early 2030s, as well as potentially performing additional roles currently conducted by other warships and auxiliaries. These vessels will enable the projection of littoral strike capability worldwide and ensure that a modernised amphibious capability is available to the Commando Force.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER, compared with the project's assessment last year of AMBER. This is due to the following factors. While there have been improvements across Programme Governance, Resources and Working Practices, this remains a complex and challenging Programme with appropriate levels of risk and uncertainty at this stage (Concept Phase). To improve delivery confidence, the Programme Team are undertaking evidence gathering in order to make informed decisions around options and the route to commercial competition.","startDate":"2024-04-01","endDate":null,"scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/01/2040. This is primarily due to the following factors. The end date is based on the current deterministic In Service Dates for the six MRSS. This date will be reviewed and updated as part of the Outline Business Case submission in Q3-25, informed by an increased understanding of the commercial strategy and outcomes from the Strategic Defence Review.","fyBaseline":26.04,"fyForecast":4.38,"fyVariance":83.18,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The in-year budget is currently showing the Strategic Outline Case (July 2023) Annual Budget Cycle (ABC) figures which remain extant at 26.042M, but while MRSS is in the Concept Phase the actual approval is limited to a Standing Approval of £10M for which the In-Year Forecast spend is £4.379M therefore showing an artificial under-spend.","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Approvals & decisions","Commercial & supply chain","Delivery & schedule"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER, compared with the project's assessment last year of AMBER. This is due to the following factors. While there have been improvements across Programme Governance, Resources and Working Practices, this remains a complex and challenging Programme with appropriate…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"MOD_0320_2324-Q3","year":2026,"name":"MULTI ROLE STRIKE SHIP","department":"MOD","category":"Military Capability","description":"The Programme will provide Littoral Lift Capabilities to replace the current ageing mixed fleet of amphibious vessels in the early 2030s, as well as potentially performing additional roles currently conducted by other warships and auxiliaries. These vessels will enable the projection of littoral strike capability worldwide and ensure that a modernised amphibious capability is available to the Commando Force.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 decreased to Red. This is primarily due to the following factors. 1. Following submission of the Outline Business Case to the Navy Investment Decision Panel, the decision was taken for a Programme pause and reset, to await the formal outcomes of the Defence Investment Plan and to determine the best approach to delivering the littoral lift capability within a reduced budgetary total. 2. The change to the Programme Total Cost, and Defence Investment Plan uncertainty has lead to a Red assessment.","startDate":"2024-04-01","endDate":"2040-01-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 31/01/2040. The programme will be reset during FY26.","fyBaseline":11.2,"fyForecast":null,"fyVariance":null,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. 1. The Variance between budget and forecast in the current year and future years is subject to a programme reset and re-baselined IOC date.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Approvals & decisions","Scope & requirements","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 decreased to Red. This is primarily due to the following factors. 1. Following submission of the Outline Business Case to the Navy Investment Decision Panel, the decision was taken for a Programme pause and reset, to await the formal outcomes of the…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"MOD_0320_2324-Q3","year":2025,"name":"MULTI ROLE STRIKE SHIP","department":"MoD","category":"Military Capability","description":"The Multi-Role Strike Ship (MRSS) programme will replace the current ageing mixed fleet of amphibious vessels in the early 2030s, as well as potentially performing additional roles currently conducted by other warships and auxiliaries. These vessels will enable the projection of littoral strike capability worldwide and ensure that a modernised amphibious capability is available to the Commando Force.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER, compared with the project's assessment last year of AMBER. This is due to the following factors. While there have been improvements across Programme Governance, Resources and Working Practices, this remains a complex and challenging Programme with appropriate levels of risk and uncertainty at this stage (Concept Phase). To improve delivery confidence, the Programme Team are undertaking evidence gathering in order to make informed decisions around options and the route to commercial competition.","startDate":"2024-04-01","endDate":null,"scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/01/2040. This is primarily due to the following factors. The end date is based on the current deterministic In Service Dates for the six MRSS. This date will be reviewed and updated as part of the Outline Business Case submission in Q3-25, informed by an increased understanding of the commercial strategy and outcomes from the Strategic Defence Review.","fyBaseline":26.04,"fyForecast":4.38,"fyVariance":83.18,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The in-year budget is currently showing the Strategic Outline Case (July 2023) Annual Budget Cycle (ABC) figures which remain extant at 26.042M, but while MRSS is in the Concept Phase the actual approval is limited to a Standing Approval of £10M for which the In-Year Forecast spend is £4.379M therefore showing an artificial under-spend.","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Approvals & decisions","Commercial & supply chain","Delivery & schedule"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER, compared with the project's assessment last year of AMBER. This is due to the following factors. While there have been improvements across Programme Governance, Resources and Working Practices, this remains a complex and challenging Programme with appropriate…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":1,"transition":"Worsened","endDateDeltaDays":null,"attentionScore":60,"attentionReasons":["Current published delivery confidence is Red","Published rating worsened from Amber to Red"]},{"id":"DHSC_0041_2122-Q3","year":2026,"name":"Future NHS Workforce Solution Transformation Programme","department":"DHSC","category":"Information and Communications Technology (ICT)","description":"The Electronic Staff Record is a single workforce management tool for the NHS offering an \"end to end\" solution during NHS employment. ESR provides salary payments and other pay related remuneration to over 1.9 million employees, circa 5% of the working population in England and Wales. The Programme will deliver a transformed workforce solution for the NHS. The primary drivers are: - Expiry of the current contract for the provision of ESR in August 2026 (extension from August 2025 - August 2026 to facilitate an appropriate transition window; enabling the safe take on of the existing service by the supplier of the new agreement); - The end of premium support for the Oracle eBS software from 2035; - The need to transform the existing solution to provide a modernised digital service to end users coupled with the accurate and timely provision of workforce data.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Exempt under Section 43 - Commercial interests","startDate":"2020-01-02","endDate":"2031-02-28","scheduleNarrative":"Exempt under Section 43 - Commercial interests","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":16891.12,"benefitsNarrative":"Compared to financial year 2024/25-Q4, the project’s departmentally agreed benefits have increased. This is because the programme’s benefits case has been refined, and an updated position was included in the Full Business Case (FBC), which was approved in September 2025. This approval established a new baseline. Both cash-releasing and non-cash-releasing benefits will be realised by user organisations. These benefits primarily relate to: User experience Interoperability Data insights They represent incremental improvements on top of the existing benefits delivered by the current ESR service solution.","themes":["Commercial & supply chain"],"evidenceExcerpt":"Exempt under Section 43 - Commercial interests Exempt under Section 43 - Commercial interests","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"DHSC_0041_2122-Q3","year":2022,"name":"ESR Transformation Programme","department":"DHSC","category":"ICT","description":"The Electronic Staff Record is a single workforce management tool for the NHS offering an 'end to end' solution during NHS employment. ESR provides salary payments and other pay related remuneration to 1.8 million employees, circa 5% of the working population in England and Wales. The Programme will define and deliver the future transformation roadmap for the ESR service from August 2025 including technology, application and service design. The primary drivers are: - Expiry of the current contract for the provision of ESR in August 2025; - The end of premium support for the Oracle eBS software in 2032; - The need to transform the existing solution to provide a modernised digital service to end users coupled with real-time system interoperability leading to the accurate and timely provision of workforce data. - Align ESR to national Programmes and initiatives such as NHS England Future of HR & OD Programme and NHS Wales Health and Care Workforce Strategy.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 is Amber The SRO has accepted the recommendations received as part of the Stage Gate 2 Review held in March 2022 and an action plan has been put in place to address the recommendations as required.","startDate":"2020-01-02","endDate":"2031-02-28","scheduleNarrative":"Your project end-date is 28 FEB 2031. This is primarily due to the following factors: The main driver for the project end date is the need to complete transformation and migration to the new workforce solution across all in-scope organizations before the expiry of the existing legacy product in 2032.","fyBaseline":3.04,"fyForecast":2.44,"fyVariance":-20.0,"varianceNarrative":"The budget variance exceeds 5%. The variance represents the underspend in 2021/2022 of 0.6m as a result of completing the Discovery activities which have informed next steps for the programme. As a result of the Discovery findings a change of approach was implemented which resulted in reprofile of spend from 2021/2022 to 2022/2023 and this is captured in v2.0 of the OBC","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"","themes":["Commercial & supply chain","Cost & funding","Governance & assurance","Delivery & schedule"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 is Amber The SRO has accepted the recommendations received as part of the Stage Gate 2 Review held in March 2022 and an action plan has been put in place to address the recommendations as required. Your project end-date is 28 FEB 2031. This is primarily due to the…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"DHSC_0041_2122-Q3","year":2023,"name":"ESR Transformation Programme","department":"DHSC","category":"ICT","description":"The Electronic Staff Record is a single workforce management tool for the NHS offering an end to end solution during NHS employment. ESR provides salary payments and other pay related remuneration to 1.8 million employees, circa 5% of the working population in England and Wales. The Programme will define and deliver the future transformation roadmap for the ESR service from August 2025 including technology, application and service design. The primary drivers are: - Expiry of the current contract for the provision of ESR in August 2025; - The end of premium support for the Oracle eBS software in 2033; - The need to transform the existing solution to provide a modernised digital service to end users coupled with the accurate and timely provision of workforce data.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber (SRO rating). This is primarily due to the following factors. The SRO has accepted the recommendations received as part of the Stage Gate 2 Review held in March 2022 and an action plan has been put in place to address the recommendations as required.","startDate":"2020-01-02","endDate":"2031-02-28","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2031-02-28. This is primarily due to the following factors. The main driver for the project end date is the need to complete transformation and migration to the new workforce solution across all in-scope organisations before the expiry of the existing legacy product in 2033.","fyBaseline":12.19,"fyForecast":6.47,"fyVariance":-47.0,"varianceNarrative":"The programme has underspent in the 2022/23 financial year due to slippage in the programme schedule including approval of the OBC taking longer than planned, extension of the timeline for submission of Supplier Questionnaires in order to maximise the opportunity for supplier submissions and a commercial issue impacting on the issuing of the Invitation to Submit Initial Tenders. The impact to programme timelines have required significant reprofiling of budget assumptions. Work to reprofile costs for future years within the existing funding envelope has been undertaken. Forecasted figures for 23/24 have been updated accordingly.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":3449.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 3449m. The project's departmental-agree monetised benefits at 22/23-Q4 is 3449m.The project's departmental-agree monetised benefits at 22/23-Q4 is 3449m.The project's departmental-agree monetised benefits at 22/23-Q4 is 3449m. Both cash releasing and non-cash releasing benefits are realised by user organisations and are broadly related to user experience, interoperability, and data insights. These are incremental benefits on top of the established benefits from the existing ESR service solution.","themes":["Commercial & supply chain","Cost & funding","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber (SRO rating). This is primarily due to the following factors. The SRO has accepted the recommendations received as part of the Stage Gate 2 Review held in March 2022 and an action plan has been put in place to address the recommendations as required.…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"DHSC_0041_2122-Q3","year":2024,"name":"ESR Transformation Programme","department":"DHSC","category":"ICT","description":"The Electronic Staff Record is a single workforce management tool for the NHS offering an \"end to end\" solution during NHS employment. ESR provides salary payments and other pay related remuneration to 1.8 million employees, circa 5% of the working population in England and Wales. The Programme will define and deliver the future transformation roadmap for the ESR service from Spring 2026 including technology, application and service design. _x000D_ The primary drivers are:_x000D_ - Expiry of the current contract for the provision of ESR in August 2026 (extension from August 2025 - August 2026 to facilitate an appropriate transition window; enabling the safe take on of the existing service by the supplier of the new agreement);_x000D_ - The end of premium support for the Oracle eBS software in 2034;_x000D_ - The need to transform the existing solution to provide a modernised digital service to end users coupled with the accurate and timely provision of workforce data.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber(IPA rating). This is primarily due to the following factors. The SRO has accepted the recommendations received as part of the IPA Annual Assurance Review held in February 2024. An action plan has been put in place to address the recommendations as required with updates provided to Programme Board on a monthly basis.","startDate":"2020-01-02","endDate":"2031-02-28","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2031-02-28. This is primarily due to the following factors. The main driver for the project end date remains aligned with the need to complete transformation and migration to the new workforce solution across all in-scope organisations before the expiry of the existing legacy product.","fyBaseline":7.13,"fyForecast":6.46,"fyVariance":-9.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. On 26th February 2024, notification was formally received from the DHSC Investment Team that the OBC Addendum in relation to the incumbent supplier contract extension for the ESR Transformation Programme had been approved by DHSC Investment Committee, Ministers and HMT. Due to previously reported delays, securing an incumbent extension option was progressed as a mitigation to ensure there is an appropriate transition window for the selected supplier to safely take on the running of the existing service. Following the OBC addendum approval, the baseline and forecast figures have been reprofiled. A minimal underspend is forecast, with Q4 figures in the process of being finalised.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":3373.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 2324-Q4 decreased from 3449m. to 3373m. Both cash releasing and non-cash releasing benefits are realised by user organisations and are broadly related to user experience, interoperability, and data insights. These are incremental benefits on top of the established benefits from the existing ESR service solution.","themes":["Commercial & supply chain","Governance & assurance","Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber(IPA rating). This is primarily due to the following factors. The SRO has accepted the recommendations received as part of the IPA Annual Assurance Review held in February 2024. An action plan has been put in place to address the recommendations as…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"DHSC_0041_2122-Q3","year":2025,"name":"Future NHS Workforce Solution Transformation Programme","department":"DHSC","category":"ICT","description":"The Electronic Staff Record is a single workforce management tool for the NHS offering an end to end solution during NHS employment. ESR provides salary payments and other pay related remuneration to over 1.9 million employees, circa 5% of the working population in England and Wales. The Programme will deliver a transformed workforce solution for the NHS. The primary drivers are: - Expiry of the current contract for the provision of ESR in August 2026 (extension from August 2025 - August 2026 to facilitate an appropriate transition window; enabling the safe take on of the existing service by the supplier of the new agreement); - The end of premium support for the Oracle eBS software from 2035; - The need to transform the existing solution to provide a modernised digital service to end users coupled with the accurate and timely provision of workforce data.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors‚ the comprehensive action plan put in place to address recommendations coming out of February 2024 NISTA Annual Assurance Review; and milestones for the pilot and subsequent implementation are on track.","startDate":"2020-11-23","endDate":"2031-01-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 decreased from 28/02/2031 to 31/01/2031. This is primarily due to the following factors‚ The main driver for the project end date remains aligned with the need to complete transformation and migration to the new workforce solution across all in-scope organisations before the expiry of the existing legacy product.","fyBaseline":16.41,"fyForecast":9.95,"fyVariance":39.37,"varianceNarrative":"The budget variance exceeds 5%. The budget variance exceeds 5%. This is primarily due to previously reported slippage with the critical path in the procurement project, the FBC development and approval will not conclude in this financial year, therefore activity must continue into 25/26 to conclude the procurement and produce the FBC.","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":3372.57,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) decreased from 3373 to 3372. This is primarily due to the following factors‚ Both cash releasing and non-cash releasing benefits are realised by user organisations and are broadly related to user experience, interoperability, and data insights. These are incremental benefits on top of the established benefits from the existing ESR service solution. The reported reduction is simply due to rounding.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors‚ the comprehensive action plan put in place to address recommendations coming out of February 2024 NISTA Annual Assurance Review; and milestones for the…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"DHSC_0041_2122-Q3","year":2026,"name":"Future NHS Workforce Solution Transformation Programme","department":"DHSC","category":"Information and Communications Technology (ICT)","description":"The Electronic Staff Record is a single workforce management tool for the NHS offering an \"end to end\" solution during NHS employment. ESR provides salary payments and other pay related remuneration to over 1.9 million employees, circa 5% of the working population in England and Wales. The Programme will deliver a transformed workforce solution for the NHS. The primary drivers are: - Expiry of the current contract for the provision of ESR in August 2026 (extension from August 2025 - August 2026 to facilitate an appropriate transition window; enabling the safe take on of the existing service by the supplier of the new agreement); - The end of premium support for the Oracle eBS software from 2035; - The need to transform the existing solution to provide a modernised digital service to end users coupled with the accurate and timely provision of workforce data.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Exempt under Section 43 - Commercial interests","startDate":"2020-01-02","endDate":"2031-02-28","scheduleNarrative":"Exempt under Section 43 - Commercial interests","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":16891.12,"benefitsNarrative":"Compared to financial year 2024/25-Q4, the project’s departmentally agreed benefits have increased. This is because the programme’s benefits case has been refined, and an updated position was included in the Full Business Case (FBC), which was approved in September 2025. This approval established a new baseline. Both cash-releasing and non-cash-releasing benefits will be realised by user organisations. These benefits primarily relate to: User experience Interoperability Data insights They represent incremental improvements on top of the existing benefits delivered by the current ESR service solution.","themes":["Commercial & supply chain"],"evidenceExcerpt":"Exempt under Section 43 - Commercial interests Exempt under Section 43 - Commercial interests","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"DHSC_0041_2122-Q3","year":2025,"name":"Future NHS Workforce Solution Transformation Programme","department":"DHSC","category":"ICT","description":"The Electronic Staff Record is a single workforce management tool for the NHS offering an end to end solution during NHS employment. ESR provides salary payments and other pay related remuneration to over 1.9 million employees, circa 5% of the working population in England and Wales. The Programme will deliver a transformed workforce solution for the NHS. The primary drivers are: - Expiry of the current contract for the provision of ESR in August 2026 (extension from August 2025 - August 2026 to facilitate an appropriate transition window; enabling the safe take on of the existing service by the supplier of the new agreement); - The end of premium support for the Oracle eBS software from 2035; - The need to transform the existing solution to provide a modernised digital service to end users coupled with the accurate and timely provision of workforce data.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors‚ the comprehensive action plan put in place to address recommendations coming out of February 2024 NISTA Annual Assurance Review; and milestones for the pilot and subsequent implementation are on track.","startDate":"2020-11-23","endDate":"2031-01-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 decreased from 28/02/2031 to 31/01/2031. This is primarily due to the following factors‚ The main driver for the project end date remains aligned with the need to complete transformation and migration to the new workforce solution across all in-scope organisations before the expiry of the existing legacy product.","fyBaseline":16.41,"fyForecast":9.95,"fyVariance":39.37,"varianceNarrative":"The budget variance exceeds 5%. The budget variance exceeds 5%. This is primarily due to previously reported slippage with the critical path in the procurement project, the FBC development and approval will not conclude in this financial year, therefore activity must continue into 25/26 to conclude the procurement and produce the FBC.","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":3372.57,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) decreased from 3373 to 3372. This is primarily due to the following factors‚ Both cash releasing and non-cash releasing benefits are realised by user organisations and are broadly related to user experience, interoperability, and data insights. These are incremental benefits on top of the established benefits from the existing ESR service solution. The reported reduction is simply due to rounding.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors‚ the comprehensive action plan put in place to address recommendations coming out of February 2024 NISTA Annual Assurance Review; and milestones for the…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":1,"transition":"Worsened","endDateDeltaDays":28,"attentionScore":59,"attentionReasons":["Current published delivery confidence is Amber","Published rating worsened from Green to Amber","Published end date moved 28 days later","In-year forecast variance is +43.0%"]},{"id":"DFT_0141_2223-Q1","year":2026,"name":"NORTHERN POWERHOUSE RAIL","department":"DFT","category":"Infrastructure and Construction","description":"Northern Powerhouse Rail (NPR) is the Government's long-term programme to further improve connectivity in the North of England as a fundamental part of the government's Northern Growth Strategy. Northern Powerhouse Rail aims to create a frequent and reliable turn-up-and-go railway service across the Northern Growth Corridor (including Liverpool, Manchester, Bradford, Leeds, Sheffield and York) with regular services continuing to Newcastle, Hull and Chester.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to the financial year 24/25 Q4, the NISTA Delivery Confidence Assessment rating at 25/26 Q4 has improved from Red to Amber. This improvement is primary a result of NPR receiving an agreed funding commitment in January 2026 of up to £45bn in 2025 prices, along with decisions on the single biggest scope choice in terms of the approach between Manchester and Liverpool and use of the Crewe-Manchester hybrid Bill.","startDate":"2016-02-01","endDate":"2051-12-31","scheduleNarrative":"Compared to the financial year 24/25 Q4 the NPR project end date has increased from December 2045 to December 2051. This reflects updates to the scope of the programme which had not been updated since the previous government's Network North Command Paper, and takes into account the planning which is forming the Programme Business Case.","fyBaseline":200.84,"fyForecast":60.67,"fyVariance":69.79,"varianceNarrative":"The budget variance for NPR for FY 25/26 has exceeded 5% which is a result of the following factors: The uncertainty around scope of the programme and direction of the hybrid Bill until January 2026 caused a number of previously planned activities to be either deferred into future financial years or removed from the scope of the programme; resulting in a reduction of spend from the previous programme baseline. The NPR Programme will formally rebaseline its cost profile following the completion of the Programme Business Case.","wholeLifeCost":45000.0,"costNarrative":"Compared to Financial Year 24/25-Q4 the programme's agreed whole life costs at Q4 25-26 (measured in £bn) has increased from 30.60 in 2019 prices to 45.00 in 2025 prices. This update reflects the agreed government upper limit funding profile which was announced as part of the Northern Powerhouse Rail announcement within the wider Northern Growth Strategy in January 2026. A refined cost profile for the programme will be developed following the completion of the Programme Business Case.","benefits":11629.06,"benefitsNarrative":"Compared to financial year 24/25-Q4, the programme's departmentally agreed Benefits at 25/26-Q4 (measured in £m in 2010/11 prices) remained at 8007. NPR benefits continue to remain unchanged pending an update as part of the Programme Business Case due later in the year. An updated benefits profile will be produced following the publication of the Programme Business Case","themes":["Cost & funding","Scope & requirements","Approvals & decisions","Delivery & schedule"],"evidenceExcerpt":"Compared to the financial year 24/25 Q4, the NISTA Delivery Confidence Assessment rating at 25/26 Q4 has improved from Red to Amber. This improvement is primary a result of NPR receiving an agreed funding commitment in January 2026 of up to £45bn in 2025 prices, along with decisions on the single biggest scope choice in terms of the approach between…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"DFT_0141_2223-Q1","year":2023,"name":"Northern Powerhouse Rail (NPR)","department":"DFT","category":"Infrastructure and Construction","description":"Northern Powerhouse Rail (NPR) is the Government's vision to transform rail connectivity by providing faster and more frequent services between the Norths key economic centres. NPR is aligned to the government's Integrated Rail Plan and, subject to ministerial agreement, will see route developments and upgrades between Liverpool to Manchester, Leeds, York, and Newcastle.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 is Amber. This is primarily due to the following factors. The Strategic Outline Business Case (SOBC) continues to be revised to align to the Integrated Rail Plan (IRP) including updating the economic analysis underpinning the NPR Business Case. Due to the assurance of the economic analysis outputs taking longer than anticipated, the scheduled date for ministerial approval (Q4 FY 2022/23) has been impacted.A revised plan has been developed, which, subject to necessary approvals being received at each stage, will see the SOBC submitted to government for approval in Q2 FY 2023/24. Despite the delay to the original plan, ultimate delivery of the scheme as planned remains feasible, with additional uncertainty over actual target dates until the post-Autumn Statement re-baselining of the whole IRP portfolio is complete.","startDate":"2016-06-01","endDate":"2045-01-01","scheduleNarrative":"The project's end-date at 22/23-Q4 is 2045-01-01. This is primarily due to the following factors. End date aligns with recently published Integrated Rail Plan (IRP) report. Northern Powerhouse Rail Strategic Outline Business Case (SOBC) is being updated to align with the Integrated Rail Plan (IRP).","fyBaseline":39.1,"fyForecast":30.5,"fyVariance":-22.0,"varianceNarrative":"The budget variance exceeds 5%. Majority of underspend sits with Network Rail due to funding and remit being confirmed in Q1 of Financial Year 2022/23 which impacted Network Rail ability to mobilise and commence activity at the start of the Financial Year (22/23).","wholeLifeCost":17265.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 22/23-Q4 is 17265m. This is primarily due to the following factors. The figure provided is the capital cost (2019 prices) of building the NPR Core network in line with the Strategic Outline Business Case being prepared. This figure will be reviewed in Q1 2023/24 as it currently does not include operating costs, renewal costs, or the impact of the real cost of inflation.","benefits":19453.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 19453m. The figure shown is based on early planning and is being updated as part of finalisation of the Strategic Outline Business Case. A revised figure will be provided in Q1 2023/24.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Commercial & supply chain"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 is Amber. This is primarily due to the following factors. The Strategic Outline Business Case (SOBC) continues to be revised to align to the Integrated Rail Plan (IRP) including updating the economic analysis underpinning the NPR Business Case. Due to the assurance of…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"DFT_0141_2223-Q1","year":2024,"name":"Northern Powerhouse Rail (NPR)","department":"DFT","category":"Infrastructure and Construction","description":"Northern Powerhouse Rail (NPR) is the government's vision to transform east - west rail connectivity in the North of England by providing faster and more frequent services between its key economic centres. The scope of NPR is set out in Network North and the Integrated Rail Plan. It will deliver improvements to rail capacity and journey times via fully electrified, upgraded, and new railway lines between Liverpool, Manchester, Bradford, Leeds, Sheffield, Rotherham, York, Hull, and Newcastle.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. Following the Network North announcement in October 2023, the programme will need to fully revise the Strategic Outline Business Case (SOBC) to reflect the expanded scope of Northern Powerhouse Rail (NPR). Delivery of the SOBC is dependent on a new funding profile for NPR being agreed across government and will encompass a re-assessment of NPR's value for money proposition. In March 2024, ministers set out the proposed next steps for the NPR route between Liverpool and Manchester, with the primary option to include new stations at Warrington and Manchester Airport, and the ambition to adapt the HS2 Phase 2b hybrid Bill for NPR.","startDate":"2016-06-01","endDate":"2045-12-29","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 increased from 2045-01-01 to 2045-12-29. This is primarily due to the following factors. End date aligns with Integrated Rail Plan (IRP) target year of 2045. The project end date will be reassessed as part of the revision of the SOBC to reflect the additional Network North scope.","fyBaseline":35.89,"fyForecast":33.52,"fyVariance":-7.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The underspend was caused by:_x000D_ 1. The early completion of the feasibility stage of work on the NPR core (pre-Network North announcement) route._x000D_ 2. Re-planning and changes to work plans that were required to reflect the changes in scope following the Network North announcement.","wholeLifeCost":30600.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 increased from 17265m. to 30600m. This is primarily due to the following factors. This is due to the scope of NPR being expanded by the Network North announcement, including NPR becoming responsbile for a section of route between Liverpool and Manchester that would previously have been delivered by HS2 Phase 2b.","benefits":8007.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 2324-Q4 decreased from 19453m. to 8007m. Benefits have remained broafly flat since last reported, whilst the expansion in the geography and scope of NPR as part of Network North increased benefits, this has been offset by the removal of HS2 Phase 2b from the do-minimum scenario as well as the impact of long-term travel behaviour changes as a result of the Covid-19 pandemic, which was not included in previous forecasts.","themes":["Cost & funding","Scope & requirements","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. Following the Network North announcement in October 2023, the programme will need to fully revise the Strategic Outline Business Case (SOBC) to reflect the expanded…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"DFT_0141_2223-Q1","year":2025,"name":"NORTHERN POWERHOUSE RAIL","department":"DfT","category":"Infrastructure and Construction","description":"Northern Powerhouse Rail (NPR) is the Government’s long-term programme to further improve rail connectivity in the North of England, building on the Transpennine Route Upgrade. it will provide faster and more frequent services between the key economic centres, including Liverpool, Manchester, Bradford, Leeds, Sheffield, and York; delivering improvements to rail capacity and journey times via electrified, upgraded, and new railway lines.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 changed from AMBER to RED. This reflects the position in March 2025, as at IPA’s last internal review point, before funding decisions were taken as part of the Spending Review and in advance of formal announcements about the forward programme. At Spending Review in June 2025, the government confirmed it will provide funding to progress this government’s long-term strategic rail ambitions, in the North of England. Work is ongoing to confirm funding decisions and government plans for NPR further to Spending Review.","startDate":"2016-06-01","endDate":"2045-12-29","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 29/12/2045. This is primarily due to the following factors‚ The current NPR programme baseline reflects the scope as originally established under the previous government. As the SR25 is expected to confirm a similar scope, the existing baseline remains broadly aligned. Following the conclusion of SR25, formal change control processes will be undertaken to update the baseline—primarily to reflect revised scheduling and delivery profiles.","fyBaseline":131.61,"fyForecast":80.59,"fyVariance":38.77,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The difference between cost baseline and actuals/forecasts is due to re-prioritisation/re-scope of work to accommodate financial pressures the Department had to face in FY24/25. Some projects have been either paused or delayed to remain within the available Departmental envelope. Future forecasts are subject to the outcome of the Spending Review 25 for which negotiations are currently ongoing as well as ministerial decisions on future scope and strategy for NPR.","wholeLifeCost":30600.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 30600. Once Ministerial decisions on the programme will be taken, the Whole Life Cost of the programme will be rebaselined.","benefits":8007.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 8007. Benefits remain unchanged but will be updated in the revised Programme Business Case being produced.","themes":["Cost & funding","Governance & assurance","Scope & requirements","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 changed from AMBER to RED. This reflects the position in March 2025, as at IPA’s last internal review point, before funding decisions were taken as part of the Spending Review and in advance of formal announcements about the forward…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"DFT_0141_2223-Q1","year":2026,"name":"NORTHERN POWERHOUSE RAIL","department":"DFT","category":"Infrastructure and Construction","description":"Northern Powerhouse Rail (NPR) is the Government's long-term programme to further improve connectivity in the North of England as a fundamental part of the government's Northern Growth Strategy. Northern Powerhouse Rail aims to create a frequent and reliable turn-up-and-go railway service across the Northern Growth Corridor (including Liverpool, Manchester, Bradford, Leeds, Sheffield and York) with regular services continuing to Newcastle, Hull and Chester.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to the financial year 24/25 Q4, the NISTA Delivery Confidence Assessment rating at 25/26 Q4 has improved from Red to Amber. This improvement is primary a result of NPR receiving an agreed funding commitment in January 2026 of up to £45bn in 2025 prices, along with decisions on the single biggest scope choice in terms of the approach between Manchester and Liverpool and use of the Crewe-Manchester hybrid Bill.","startDate":"2016-02-01","endDate":"2051-12-31","scheduleNarrative":"Compared to the financial year 24/25 Q4 the NPR project end date has increased from December 2045 to December 2051. This reflects updates to the scope of the programme which had not been updated since the previous government's Network North Command Paper, and takes into account the planning which is forming the Programme Business Case.","fyBaseline":200.84,"fyForecast":60.67,"fyVariance":69.79,"varianceNarrative":"The budget variance for NPR for FY 25/26 has exceeded 5% which is a result of the following factors: The uncertainty around scope of the programme and direction of the hybrid Bill until January 2026 caused a number of previously planned activities to be either deferred into future financial years or removed from the scope of the programme; resulting in a reduction of spend from the previous programme baseline. The NPR Programme will formally rebaseline its cost profile following the completion of the Programme Business Case.","wholeLifeCost":45000.0,"costNarrative":"Compared to Financial Year 24/25-Q4 the programme's agreed whole life costs at Q4 25-26 (measured in £bn) has increased from 30.60 in 2019 prices to 45.00 in 2025 prices. This update reflects the agreed government upper limit funding profile which was announced as part of the Northern Powerhouse Rail announcement within the wider Northern Growth Strategy in January 2026. A refined cost profile for the programme will be developed following the completion of the Programme Business Case.","benefits":11629.06,"benefitsNarrative":"Compared to financial year 24/25-Q4, the programme's departmentally agreed Benefits at 25/26-Q4 (measured in £m in 2010/11 prices) remained at 8007. NPR benefits continue to remain unchanged pending an update as part of the Programme Business Case due later in the year. An updated benefits profile will be produced following the publication of the Programme Business Case","themes":["Cost & funding","Scope & requirements","Approvals & decisions","Delivery & schedule"],"evidenceExcerpt":"Compared to the financial year 24/25 Q4, the NISTA Delivery Confidence Assessment rating at 25/26 Q4 has improved from Red to Amber. This improvement is primary a result of NPR receiving an agreed funding commitment in January 2026 of up to £45bn in 2025 prices, along with decisions on the single biggest scope choice in terms of the approach between…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"DFT_0141_2223-Q1","year":2025,"name":"NORTHERN POWERHOUSE RAIL","department":"DfT","category":"Infrastructure and Construction","description":"Northern Powerhouse Rail (NPR) is the Government’s long-term programme to further improve rail connectivity in the North of England, building on the Transpennine Route Upgrade. it will provide faster and more frequent services between the key economic centres, including Liverpool, Manchester, Bradford, Leeds, Sheffield, and York; delivering improvements to rail capacity and journey times via electrified, upgraded, and new railway lines.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 changed from AMBER to RED. This reflects the position in March 2025, as at IPA’s last internal review point, before funding decisions were taken as part of the Spending Review and in advance of formal announcements about the forward programme. At Spending Review in June 2025, the government confirmed it will provide funding to progress this government’s long-term strategic rail ambitions, in the North of England. Work is ongoing to confirm funding decisions and government plans for NPR further to Spending Review.","startDate":"2016-06-01","endDate":"2045-12-29","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 29/12/2045. This is primarily due to the following factors‚ The current NPR programme baseline reflects the scope as originally established under the previous government. As the SR25 is expected to confirm a similar scope, the existing baseline remains broadly aligned. Following the conclusion of SR25, formal change control processes will be undertaken to update the baseline—primarily to reflect revised scheduling and delivery profiles.","fyBaseline":131.61,"fyForecast":80.59,"fyVariance":38.77,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The difference between cost baseline and actuals/forecasts is due to re-prioritisation/re-scope of work to accommodate financial pressures the Department had to face in FY24/25. Some projects have been either paused or delayed to remain within the available Departmental envelope. Future forecasts are subject to the outcome of the Spending Review 25 for which negotiations are currently ongoing as well as ministerial decisions on future scope and strategy for NPR.","wholeLifeCost":30600.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 30600. Once Ministerial decisions on the programme will be taken, the Whole Life Cost of the programme will be rebaselined.","benefits":8007.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 8007. Benefits remain unchanged but will be updated in the revised Programme Business Case being produced.","themes":["Cost & funding","Governance & assurance","Scope & requirements","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 changed from AMBER to RED. This reflects the position in March 2025, as at IPA’s last internal review point, before funding decisions were taken as part of the Spending Review and in advance of formal announcements about the forward…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":-1,"transition":"Improved","endDateDeltaDays":2193,"attentionScore":53,"attentionReasons":["Current published delivery confidence is Amber","Published end date moved 2,193 days later","In-year forecast variance is +69.8%"]},{"id":"MOJ_0365_2425-Q1","year":2026,"name":"PFI Prison Expiry and Transfer Tranche 3","department":"MOJ","category":"Government Transformation and Service Delivery","description":"The PFI Tranche 3 Project will oversee the exit and transfer of operational services at HMP Dovegate, HMP Doncaster, HMP Oakwood and HMP Rye Hill in a safe, effective and efficient manner. The Tranche 3 project includes the re-procurement of the Prison Operator Services Framework to ensure that HMPPS continues to have an efficient vehicle for delivering operator competitions. The project also includes delivery of up to 345 prisoner places through the construction of an additional houseblock at HMP & YOI Parc.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25-Q4, the NISTA Delivery Confidence Assessment (DCA) rating at 25/26-Q4 has remained at Amber. This is primarily due to the addition of the HMP Rye Hill houseblock to project scope, and ongoing costing and scheduling challenges which continue in HMP & YOI Parc.","startDate":"2022-12-15","endDate":"2029-07-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end date at 25/26-Q4 has increased from 28/01/28 to 31/07/29. This is primarily due to the addition of remaining HMP Rye Hill activity to project scope, and the need to finalise the schedule for the HMP & YOI Parc Houseblock.","fyBaseline":48.81,"fyForecast":8.71,"fyVariance":82.16,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to delays in the approval of the design and derogations for the HMP & YOI Parc Houseblock impacting schedule and forecasted spend for the previous financial year.","wholeLifeCost":3335.69,"costNarrative":"Compared to financial year 24/25-Q4, the project's Whole Life Costs at 25/26-Q4 decreased from £4,614.55m to £3,335.69m. This is primarily due to successful procurement competitions yielding savings against forecasted affordability thresholds. This figure does not reflect the transfer of HMP Rye Hill competition re-run. All costs have been reported in 2024/25 base prices in line with NISTA requirements. This is a change from previous years where costs were reported in nominal prices. All costs reflect this accounting reduction regardless of any actual changes.","benefits":null,"benefitsNarrative":"This project currently reports no monetised benefits. The project seeks to realise efficiencies in future operating costs following the transfer of service to new operator contracts when compared to the PFI contracts. The project benefits also include the focus on the continued quality of service across the PFI contracts until expiry, and following the transfer of service, improvements in service quality in the new contract in line with the key Departmental priorities.","themes":["Cost & funding","Delivery & schedule","Scope & requirements","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 24/25-Q4, the NISTA Delivery Confidence Assessment (DCA) rating at 25/26-Q4 has remained at Amber. This is primarily due to the addition of the HMP Rye Hill houseblock to project scope, and ongoing costing and scheduling challenges which continue in HMP & YOI Parc. Compared to financial year 24/25-Q4, the project's end date at…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"MOJ_0365_2425-Q1","year":2025,"name":"PFI Prison Expiry and Transfer Tranche 3","department":"MoJ","category":"Government Transformation and Service Delivery","description":"The PFI Tranche 3 Project will oversee the exit and transfer of operational services at HMP Dovegate, HMP Doncaster and HMP Oakwood in a safe, effective and efficient manner. The Tranche 3 project includes the re-procurement of the Prison Operator Services Framework to ensure that HMPPS continues to have an efficient vehicle for delivering operator competitions. The project also includes delivery of additional places through the construction of an additional houseblock at HMP & YOI Parc.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER. This is due to‚ This is due to the limited contingency and complexity of the expiry and transfer activities still to be delivered.","startDate":"2022-12-15","endDate":"2028-01-28","scheduleNarrative":"The project's end-date at 24/25-Q4 is scheduled to be 28/01/2028. This is primarily due to the following factors‚ The project is on track to deliver against the baseline schedule.","fyBaseline":4.6,"fyForecast":4.88,"fyVariance":6.04,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ Changes in additional houseblock design following Outline Business Case approval.","wholeLifeCost":4614.55,"costNarrative":"The project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) is 4614. This is primarily due to the following factors‚ The Whole Life Costs are based on the most recent business case and include optimism bias.","benefits":0.0,"benefitsNarrative":"The project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) is 0. This is primarily due to the following factors‚ This project currently reports no monetised benefits. The project seeks to realise efficiencies in future operating costs following the transfer of service to new operator contracts when compared to the PFI contracts. The project benefits also include the focus on the continued quality of service across the PFI contracts until expiry, and following the transfer of service, improvements in service quality in the new contract in line with the key Departmental priorities.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Scope & requirements"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER. This is due to‚ This is due to the limited contingency and complexity of the expiry and transfer activities still to be delivered. The project's end-date at 24/25-Q4 is scheduled to be 28/01/2028. This is primarily due to the following factors‚ The project is…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"MOJ_0365_2425-Q1","year":2026,"name":"PFI Prison Expiry and Transfer Tranche 3","department":"MOJ","category":"Government Transformation and Service Delivery","description":"The PFI Tranche 3 Project will oversee the exit and transfer of operational services at HMP Dovegate, HMP Doncaster, HMP Oakwood and HMP Rye Hill in a safe, effective and efficient manner. The Tranche 3 project includes the re-procurement of the Prison Operator Services Framework to ensure that HMPPS continues to have an efficient vehicle for delivering operator competitions. The project also includes delivery of up to 345 prisoner places through the construction of an additional houseblock at HMP & YOI Parc.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25-Q4, the NISTA Delivery Confidence Assessment (DCA) rating at 25/26-Q4 has remained at Amber. This is primarily due to the addition of the HMP Rye Hill houseblock to project scope, and ongoing costing and scheduling challenges which continue in HMP & YOI Parc.","startDate":"2022-12-15","endDate":"2029-07-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end date at 25/26-Q4 has increased from 28/01/28 to 31/07/29. This is primarily due to the addition of remaining HMP Rye Hill activity to project scope, and the need to finalise the schedule for the HMP & YOI Parc Houseblock.","fyBaseline":48.81,"fyForecast":8.71,"fyVariance":82.16,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to delays in the approval of the design and derogations for the HMP & YOI Parc Houseblock impacting schedule and forecasted spend for the previous financial year.","wholeLifeCost":3335.69,"costNarrative":"Compared to financial year 24/25-Q4, the project's Whole Life Costs at 25/26-Q4 decreased from £4,614.55m to £3,335.69m. This is primarily due to successful procurement competitions yielding savings against forecasted affordability thresholds. This figure does not reflect the transfer of HMP Rye Hill competition re-run. All costs have been reported in 2024/25 base prices in line with NISTA requirements. This is a change from previous years where costs were reported in nominal prices. All costs reflect this accounting reduction regardless of any actual changes.","benefits":null,"benefitsNarrative":"This project currently reports no monetised benefits. The project seeks to realise efficiencies in future operating costs following the transfer of service to new operator contracts when compared to the PFI contracts. The project benefits also include the focus on the continued quality of service across the PFI contracts until expiry, and following the transfer of service, improvements in service quality in the new contract in line with the key Departmental priorities.","themes":["Cost & funding","Delivery & schedule","Scope & requirements","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 24/25-Q4, the NISTA Delivery Confidence Assessment (DCA) rating at 25/26-Q4 has remained at Amber. This is primarily due to the addition of the HMP Rye Hill houseblock to project scope, and ongoing costing and scheduling challenges which continue in HMP & YOI Parc. Compared to financial year 24/25-Q4, the project's end date at…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"MOJ_0365_2425-Q1","year":2025,"name":"PFI Prison Expiry and Transfer Tranche 3","department":"MoJ","category":"Government Transformation and Service Delivery","description":"The PFI Tranche 3 Project will oversee the exit and transfer of operational services at HMP Dovegate, HMP Doncaster and HMP Oakwood in a safe, effective and efficient manner. The Tranche 3 project includes the re-procurement of the Prison Operator Services Framework to ensure that HMPPS continues to have an efficient vehicle for delivering operator competitions. The project also includes delivery of additional places through the construction of an additional houseblock at HMP & YOI Parc.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER. This is due to‚ This is due to the limited contingency and complexity of the expiry and transfer activities still to be delivered.","startDate":"2022-12-15","endDate":"2028-01-28","scheduleNarrative":"The project's end-date at 24/25-Q4 is scheduled to be 28/01/2028. This is primarily due to the following factors‚ The project is on track to deliver against the baseline schedule.","fyBaseline":4.6,"fyForecast":4.88,"fyVariance":6.04,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ Changes in additional houseblock design following Outline Business Case approval.","wholeLifeCost":4614.55,"costNarrative":"The project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) is 4614. This is primarily due to the following factors‚ The Whole Life Costs are based on the most recent business case and include optimism bias.","benefits":0.0,"benefitsNarrative":"The project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) is 0. This is primarily due to the following factors‚ This project currently reports no monetised benefits. The project seeks to realise efficiencies in future operating costs following the transfer of service to new operator contracts when compared to the PFI contracts. The project benefits also include the focus on the continued quality of service across the PFI contracts until expiry, and following the transfer of service, improvements in service quality in the new contract in line with the key Departmental priorities.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Scope & requirements"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER. This is due to‚ This is due to the limited contingency and complexity of the expiry and transfer activities still to be delivered. The project's end-date at 24/25-Q4 is scheduled to be 28/01/2028. This is primarily due to the following factors‚ The project is…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":550,"attentionScore":53,"attentionReasons":["Current published delivery confidence is Amber","Published end date moved 550 days later","In-year forecast variance is +82.2%"]},{"id":"MOD_0141_2122-Q1","year":2026,"name":"BRIMSTONE 3","department":"MOD","category":"Military Capability","description":"Brimstone 3 (B3) sustains the precise, low-collateral air-to-surface Brimstone capability on the Typhoon platform, it is also being integrated onto the Protector platform.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors. 1. While awaiting formal endorsement of the revised programme baseline, it continues to manage resourcing constraints and finalisation of the operational safety case. 2. Key progress has been made, including continued stability of the schedule, safety case advancement and programme maturity.","startDate":"2017-03-23","endDate":"2031-01-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 31/12/2028.","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Delivery & schedule","Commercial & supply chain","Cost & funding","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors. 1. While awaiting formal endorsement of the revised programme baseline, it continues to manage resourcing constraints and finalisation of the operational safety case. 2. Key progress…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"MOD_0141_2122-Q1","year":2022,"name":"Brimstone 3","department":"MOD","category":"Military Capability","description":"Brimstone 3A is an obsolescence removal programme for the in-service Brimstone 2 missile and is an integral part of the Weapons Evaluation and Capability Assurance vision for a common stockpile across more than one platform. Brimstone 3B is a software upgrade of the Brimstone 3A missile introducing slow speed, low level launch capabilities, and improved targeting algorithms to support Remotely Piloted Air Systems.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Brimstone 3 Programmes was previously contained within the Complex Weapons Portfolio and has been extracted to allow for better targeted approval and assurance processes. As such it is not possible to comment on its Delivery Confidence in March 21. However, it is currently assessed as Amber due to risks associated with additional Civil Aviation Authority assurance requirements when integrating on platforms such as Protector","startDate":"2017-07-01","endDate":"2029-04-30","scheduleNarrative":"The Brimstone 3 Programme was previously contained within the Complex Weapons Portfolio and has been extracted to allow for better targeted approval and assurance processes. As such there is no baseline date recorded for March 21 for comparison. However, closure is currently forecast to be March 31","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests)","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests)","benefits":null,"benefitsNarrative":"","themes":["Governance & assurance","Approvals & decisions","Commercial & supply chain","Delivery & schedule"],"evidenceExcerpt":"The Brimstone 3 Programmes was previously contained within the Complex Weapons Portfolio and has been extracted to allow for better targeted approval and assurance processes. As such it is not possible to comment on its Delivery Confidence in March 21. However, it is currently assessed as Amber due to risks associated with additional Civil Aviation…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"MOD_0141_2122-Q1","year":2023,"name":"Brimstone 3","department":"MOD","category":"Military Capability","description":"Brimstone 3 sustains the precise, low-collateral air-to-surface Brimstone capability on the Typhoon platform, and is planned to be integrated onto the Protector platform.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 decreased from Amber (IPA rating) to Red (SRO rating). This is primarily due to the following factors. There are challenges with resourcing sufficient suitably qualified and experienced people across the programme and delivery teams, and within industry. A series of deep-dives, along with a monthly Programme Board with the new Senior Responsible Owner have been put in place to address these challenges. Programme Governance and the availability Management Information is also being refreshed alongside a plan to improve Programme performance. Opportunities are being identified to bring schedule back within the approved timeline. The programme is also exploring opportunities to spiral capability developments to ensure capability is delivered at the earliest opportunity.","startDate":"2017-07-01","endDate":"2029-04-30","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2029-04-30. This is primarily due to the following factors. NA","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This programme does not report cashable benefits. Its aim is to provision the armed forces with the equipment and / or infrastructure required.","themes":["Commercial & supply chain","Delivery & schedule","Governance & assurance","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 decreased from Amber (IPA rating) to Red (SRO rating). This is primarily due to the following factors. There are challenges with resourcing sufficient suitably qualified and experienced people across the programme and delivery teams, and within industry. A series of…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"MOD_0141_2122-Q1","year":2024,"name":"Brimstone 3","department":"MOD","category":"Military Capability","description":"Brimstone 3 (B3) sustains the precise, low-collateral air-to-surface Brimstone capability on the Typhoon platform, it is also planned to be integrated onto the Protector platform.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 increased from Red to Amber. This is primarily due to the following factors. The Delivery Confidence Assessment of AMBER was endorsed by an IPA Review in February 2024. There are still concerns in relation to people capability and capacity, programme management information and partnering culture which are negatively impacting the programme. There are challenges with resourcing sufficient suitably qualified and experienced people across the programme and delivery teams, and within industry. Programme Governance and the availability of Management Information is also being refreshed alongside a plan to improve Programme performance. Opportunities to spiral capability developments to ensure capability is delivered at the earliest opportunity are being considered by the SRO.","startDate":"2017-03-23","endDate":"2028-12-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 has decreased from 2029-12-30 to 2028-12-31. This is primarily due to the following factors. The previous date provided was the OSD (Out of Service Date). The programme is also undergoing a rebaselining activity which may alter the end date again.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":0.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 0m.","themes":["Workforce & capability","Commercial & supply chain","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 increased from Red to Amber. This is primarily due to the following factors. The Delivery Confidence Assessment of AMBER was endorsed by an IPA Review in February 2024. There are still concerns in relation to people capability and capacity,…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"MOD_0141_2122-Q1","year":2025,"name":"BRIMSTONE 3","department":"MoD","category":"Military Capability","description":"Brimstone 3 sustains the precise, low-collateral air-to-surface Brimstone capability on the Typhoon platform. It is also planned to be integrated onto the Protector platform.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. This is primarily due to delays in agreeing the revised baseline, continued resourcing constraints, and the need to finalise the operational safety case. While key progress has been made, including stabilisation of the delivery schedule and safety case advancement, risks remain around programme maturity and delivery confidence.","startDate":"2017-03-27","endDate":"2028-12-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/12/2028. This is primarily due to the following factors. Compared to the financial year 23/24-Q4, the programme's end date in 24/25-Q4 remains scheduled to finish on 31-12-2028.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 43 - Commercial interests","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits","themes":["Delivery & schedule","Cost & funding","Commercial & supply chain","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. This is primarily due to delays in agreeing the revised baseline, continued resourcing constraints, and the need to finalise the operational safety case. While key progress has been made, including…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"MOD_0141_2122-Q1","year":2026,"name":"BRIMSTONE 3","department":"MOD","category":"Military Capability","description":"Brimstone 3 (B3) sustains the precise, low-collateral air-to-surface Brimstone capability on the Typhoon platform, it is also being integrated onto the Protector platform.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors. 1. While awaiting formal endorsement of the revised programme baseline, it continues to manage resourcing constraints and finalisation of the operational safety case. 2. Key progress has been made, including continued stability of the schedule, safety case advancement and programme maturity.","startDate":"2017-03-23","endDate":"2031-01-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 31/12/2028.","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Delivery & schedule","Commercial & supply chain","Cost & funding","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors. 1. While awaiting formal endorsement of the revised programme baseline, it continues to manage resourcing constraints and finalisation of the operational safety case. 2. Key progress…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"MOD_0141_2122-Q1","year":2025,"name":"BRIMSTONE 3","department":"MoD","category":"Military Capability","description":"Brimstone 3 sustains the precise, low-collateral air-to-surface Brimstone capability on the Typhoon platform. It is also planned to be integrated onto the Protector platform.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. This is primarily due to delays in agreeing the revised baseline, continued resourcing constraints, and the need to finalise the operational safety case. While key progress has been made, including stabilisation of the delivery schedule and safety case advancement, risks remain around programme maturity and delivery confidence.","startDate":"2017-03-27","endDate":"2028-12-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/12/2028. This is primarily due to the following factors. Compared to the financial year 23/24-Q4, the programme's end date in 24/25-Q4 remains scheduled to finish on 31-12-2028.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 43 - Commercial interests","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits","themes":["Delivery & schedule","Cost & funding","Commercial & supply chain","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. This is primarily due to delays in agreeing the revised baseline, continued resourcing constraints, and the need to finalise the operational safety case. While key progress has been made, including…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":761,"attentionScore":52,"attentionReasons":["Current published delivery confidence is Amber","Published end date moved 761 days later","In-year forecast variance is +43.0%"]},{"id":"MOD_0139_2122-Q1","year":2026,"name":"FUTURE CRUISE ANTI SHIP WEAPON (FCASW)","department":"MOD","category":"Military Capability","description":"This programme aims to achieve delivery of a next generation complex weapon for the UK to meet the RAF’s Selective Precision Effect At Range Capability 5 (SPEAR 5) and the Navy’s Future Offensive Surface Warfare (FOSuW) requirements. In doing so it is the cornerstone of UK / French bilateral cooperation as part of the ‘Lancaster House Treaty’, which now includes Italy as a full partner and ensures UK Freedom of Action, Operational Advantage, prosperity and critical UK industrial capability in the complex weapons arena.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Exempt under Section 43 - Commercial interests","startDate":"2017-07-01","endDate":"2070-03-01","scheduleNarrative":"Exempt under Section 43 - Commercial interests","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Commercial & supply chain"],"evidenceExcerpt":"Exempt under Section 43 - Commercial interests Exempt under Section 43 - Commercial interests","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"MOD_0139_2122-Q1","year":2022,"name":"Future Cruise Anti Ship Weapon (FCASW)","department":"MOD","category":"Military Capability","description":"The Future Cruise Anti Ship Weapon programme aims to deliver a next generation complex weapon to meet the UK's Selective Precision Effect At Range Capability 5 and Future Offensive Surface Warfare requirements. In doing so it is the cornerstone of UK/Fr bilateral cooperation as part of the 'Lancaster House Treaty' and supports UK Freedom of Action, prosperity and critical UK industrial capability.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"The Future Cruise Anti Ship Weapon Programme was previously contained within the Complex Weapons Portfolio and has been extracted to allow for better targeted approval and assurance processes. As such it is not possible to comment on its Delivery Confidence in March 21. However, it is currently assessed as Red while the Senior Responsible Owner and Programme Team install revised Governance arrangements and recruit a larger programme team. Delivery Confidence is expected to increase in the first quarter of 2022/23","startDate":"2017-03-01","endDate":"2070-03-01","scheduleNarrative":"The Future Cruise Anti Ship Weapon Programme was previously contained within the Complex Weapons Portfolio and has been extracted to allow for better targeted approval and assurance processes. As such there is no baseline date recorded for March 21 for comparison. However, it is currently forecast to end in March 70","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests)","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests)","benefits":null,"benefitsNarrative":"","themes":["Governance & assurance","Approvals & decisions","Commercial & supply chain","Delivery & schedule"],"evidenceExcerpt":"The Future Cruise Anti Ship Weapon Programme was previously contained within the Complex Weapons Portfolio and has been extracted to allow for better targeted approval and assurance processes. As such it is not possible to comment on its Delivery Confidence in March 21. However, it is currently assessed as Red while the Senior Responsible Owner and…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"MOD_0139_2122-Q1","year":2023,"name":"Future Cruise Anti Ship Weapon (FCASW)","department":"MOD","category":"Military Capability","description":"The Future Cruise Anti Ship Weapon programme aims to deliver a next generation complex weapon to meet the UK's Selective Precision Effect At Range Capability 5 (SPEAR 5) and Future Offensive Surface Warfare (FOSuW) requirements. In doing so it is the cornerstone of UK/Fr bilateral cooperation as part of the 'Lancaster House Treaty' and supports UK Freedom of Action, prosperity and critical UK industrial capability.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 increased from Red (IPA rating) to Amber (SRO rating). This is primarily due to the following factors. The Programme is half-way through a 3-year Assessment Phase; the Assessment Phase remains on track with a range of concepts and options being matured to support choice and inform future decisions. The programme is assessed as Amber whilst the long-term deliverability of these choices is fully explored.","startDate":"2017-07-01","endDate":"2070-03-01","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2070-03-01. This is primarily due to the following factors. This is an indicative date, and a final programme end-date will be provided at Full Business Case.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This programme does not report cashable benefits. Its aim is to provision the armed forces with the equipment and / or infrastructure required.","themes":["Commercial & supply chain","Cost & funding","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 increased from Red (IPA rating) to Amber (SRO rating). This is primarily due to the following factors. The Programme is half-way through a 3-year Assessment Phase; the Assessment Phase remains on track with a range of concepts and options being matured to support…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"MOD_0139_2122-Q1","year":2024,"name":"Future Cruise Anti Ship Weapon (FCASW)","department":"MOD","category":"Military Capability","description":"This programme aims to achieve delivery of a next generation complex weapon for the UK to meet the RAF’s Selective Precision Effect At Range Capability 5 (SPEAR 5) and the Navy’s Future Offensive Surface Warfare requirements. In doing so it is the cornerstone of UK / French bilateral cooperation as part of the ‘Lancaster House Treaty’ and supports UK Freedom of Action, Operational Advantage, prosperity and critical UK industrial capability in the complex weapons arena.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure and Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The programme is two thirds of the way through the Assessment Phase with evaluation of all the potential options available on track. The programme remains on course to deliver this phase to within the current approvals envelope regarding cost and time. The Delivery Confidence Assessment of AMBER was also endorsed by an IPA Assurance Review in December 2023.","startDate":"2017-07-01","endDate":"2037-12-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 decreased from 2070-03-01 to 2037-12-31. This is primarily due to the following factors. The previous date provided was the Out of Service Date. To achieve consistency with all other performance reporting the project end data has been used for this year.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":0.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 0m.","themes":["Commercial & supply chain","Cost & funding","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure and Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The programme is two thirds of the way through the Assessment Phase with evaluation of all the potential options available on track. The programme remains on…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"MOD_0139_2122-Q1","year":2025,"name":"FUTURE CRUISE ANTI SHIP WEAPON (FCASW)","department":"MoD","category":"Military Capability","description":"This programme aims to achieve delivery of a next generation complex weapon for the UK to meet the RAF’s Selective Precision Effect At Range Capability 5 (SPEAR 5) and the Navy’s Future Offensive Surface Warfare (FOSuW) requirements. In doing so it is the cornerstone of UK / French bilateral cooperation as part of the ‘Lancaster House Treaty’ and supports UK Freedom of Action, Operational Advantage, prosperity and critical UK industrial capability in the complex weapons arena.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. This is because of uncertainty regarding the whole life costs from the next phase of delivery which have increased (including drivers from prevailing economic conditions). In addition, there are concerns that the programme may not meet all extant key user requirements. However, the programme has maintained its rating of Amber Compared to 12 months ago, as it completed the full scope of work for the original Assessment Phase by November 24 on time and budget. Although uncertainty with approvals has delayed the submission of the Review Note to May 25, a Continuation of Spend will maintain contract coverage to Jun 25 and has protected the delivery schedule.","startDate":"2017-07-01","endDate":"2043-04-30","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 decreased from 31/12/2037 to 25/04/2025. This is primarily due to the following factors. This takes into account the anticipated completion of delivery of munitions and the transition of the capability to solely in-service support. The reported delay to 2043 also recognises the funded position of the programme throughout the upcoming Demonstration and Manufacturing phase. The reported dates are subject to the approval of the Full Business Case anticipated in 2026. It should also be noted that deliveries of stock to international partners could alter the assumed delivery rates for the munitions.","fyBaseline":227.76,"fyForecast":185.03,"fyVariance":18.76,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. This is because of the delays to the French RJ10 (RamJet 10) project. With no contract in place for the next phase between the DGA (Direction generale de l'armement) and MBDA France, the expected costs to the UK have not occurred.","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits","themes":["Delivery & schedule","Cost & funding","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. This is because of uncertainty regarding the whole life costs from the next phase of delivery which have increased (including drivers from prevailing economic conditions). In addition, there are…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"MOD_0139_2122-Q1","year":2026,"name":"FUTURE CRUISE ANTI SHIP WEAPON (FCASW)","department":"MOD","category":"Military Capability","description":"This programme aims to achieve delivery of a next generation complex weapon for the UK to meet the RAF’s Selective Precision Effect At Range Capability 5 (SPEAR 5) and the Navy’s Future Offensive Surface Warfare (FOSuW) requirements. In doing so it is the cornerstone of UK / French bilateral cooperation as part of the ‘Lancaster House Treaty’, which now includes Italy as a full partner and ensures UK Freedom of Action, Operational Advantage, prosperity and critical UK industrial capability in the complex weapons arena.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Exempt under Section 43 - Commercial interests","startDate":"2017-07-01","endDate":"2070-03-01","scheduleNarrative":"Exempt under Section 43 - Commercial interests","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Commercial & supply chain"],"evidenceExcerpt":"Exempt under Section 43 - Commercial interests Exempt under Section 43 - Commercial interests","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"MOD_0139_2122-Q1","year":2025,"name":"FUTURE CRUISE ANTI SHIP WEAPON (FCASW)","department":"MoD","category":"Military Capability","description":"This programme aims to achieve delivery of a next generation complex weapon for the UK to meet the RAF’s Selective Precision Effect At Range Capability 5 (SPEAR 5) and the Navy’s Future Offensive Surface Warfare (FOSuW) requirements. In doing so it is the cornerstone of UK / French bilateral cooperation as part of the ‘Lancaster House Treaty’ and supports UK Freedom of Action, Operational Advantage, prosperity and critical UK industrial capability in the complex weapons arena.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. This is because of uncertainty regarding the whole life costs from the next phase of delivery which have increased (including drivers from prevailing economic conditions). In addition, there are concerns that the programme may not meet all extant key user requirements. However, the programme has maintained its rating of Amber Compared to 12 months ago, as it completed the full scope of work for the original Assessment Phase by November 24 on time and budget. Although uncertainty with approvals has delayed the submission of the Review Note to May 25, a Continuation of Spend will maintain contract coverage to Jun 25 and has protected the delivery schedule.","startDate":"2017-07-01","endDate":"2043-04-30","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 decreased from 31/12/2037 to 25/04/2025. This is primarily due to the following factors. This takes into account the anticipated completion of delivery of munitions and the transition of the capability to solely in-service support. The reported delay to 2043 also recognises the funded position of the programme throughout the upcoming Demonstration and Manufacturing phase. The reported dates are subject to the approval of the Full Business Case anticipated in 2026. It should also be noted that deliveries of stock to international partners could alter the assumed delivery rates for the munitions.","fyBaseline":227.76,"fyForecast":185.03,"fyVariance":18.76,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. This is because of the delays to the French RJ10 (RamJet 10) project. With no contract in place for the next phase between the DGA (Direction generale de l'armement) and MBDA France, the expected costs to the UK have not occurred.","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits","themes":["Delivery & schedule","Cost & funding","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. This is because of uncertainty regarding the whole life costs from the next phase of delivery which have increased (including drivers from prevailing economic conditions). In addition, there are…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":9802,"attentionScore":52,"attentionReasons":["Current published delivery confidence is Amber","Published end date moved 9,802 days later","In-year forecast variance is +43.0%"]},{"id":"MOD_0056_2122-Q3","year":2026,"name":"LAND INTELLIGENCE, SURVEILLANCE, TARGET ACQUISITION AND RECONNAISSANCE (ISTAR)","department":"MOD","category":"Military Capability","description":"The Land Intelligence, Surveillance, Target Acquisition and Reconnaissance (ISTAR) Programme will deliver an adaptable, robust and agile system that will enable the Army to find the enemy at range in all operational environments. The bedrock of the system will be an open system architecture, designed to be fully integrated with current and future communications and information systems to enable digital integration across the Army, wider Defence, and our primary allies. This will enable a fully networked ISTAR system consisting of multiple sensors, that can be centrally commanded and coordinated. Automation will be used to speed up decision-making and reduce electronic emissions between component parts. The architecture, platforms and sensors required for the system will be developed and acquired separately, with a series of common standards ensuring that they remain compatible with the network.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 increased to Amber. This is primarily due to the following factors. 1. Delivery of the SRO’s Get Well Plan, including work done by the Programme Design and Integration Office on a digital ecosystem within Defence. This progress was achieved despite challenges with workforce capacity in the delivery teams and the wider complexities within Defence. 2. The improvement on the previous year’s assessment and confirmed by the Dec 2025 NISTA Assurance Review.","startDate":"2019-01-25","endDate":"2033-05-02","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 31/12/2027.","fyBaseline":79.13,"fyForecast":51.8,"fyVariance":34.54,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. 1. The programme did not spend its allocated budget due to delays in four major sub-programmes. 2. Key external factors were approvals delays, industrial capacity and a dynamic requirement set. Internally, under-resourcing of workforce limited the pace of work and the ability to respond to change. 3. Delays due to contract milestones play a big part in the variance. Delays to approvals pushing profile to the right. 4. The Watchkeeper Mid-Life Extension project has been deleted from the programme.","wholeLifeCost":1498.14,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) decreased from £1878.28M to £1622.50M This is primarily due to the following factors. 1. The Programme’s Whole Life Cost has reduced overall compared to 12 months ago. The reduction is driven primarily by Defence Board-approved requirement and scope changes, with costings removed in line with updated commissioning instructions. 2. Further decreases arise from reprofiling of assessment and delivery activity into later years due to approval and negotiation delays, incomplete achievement of system requirements, and delayed receipt of subcontractor software, resulting in Annual Budgeting Cycle impacts largely into Financial Year 26/27. 3. These reductions are partially offset by increases associated with updated Full Business Case 3 cost models using preferred bidder pricing, which has driven higher upfront support costs to enable accelerated Minimum Deployable Capability delivery, alongside minor revised estimates of cost for additional training requirements. 4. In addition, an underspend against forecast has been realised due to workforce control measures, particularly within ZODIAC RDEL, contributing to the overall reduction in Whole Life Cost. 5. Overall, movements reflect disciplined cost control, alignment to approved scope, and realistic reprofiling in line with delivery maturity.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4; the projects departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the fact that the benefits are not monetised.","themes":["Cost & funding","Delivery & schedule","Workforce & capability","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 increased to Amber. This is primarily due to the following factors. 1. Delivery of the SRO’s Get Well Plan, including work done by the Programme Design and Integration Office on a digital ecosystem within Defence. This progress was achieved despite…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"MOD_0056_2122-Q3","year":2022,"name":"Land Intelligence, Surveillance, Target Acquisition and Reconnaissance (ISTAR)","department":"MOD","category":"Military Capability","description":"The Land Intelligence, Surveillance, Target Acquisition and Reconnaissance Programme will deliver an adaptable, robust and agile system that will enable the Army to find the enemy at range in all operational environments. The bedrock of the system will be an open system architecture, designed to be fully integrated with current and future communications and information systems to enable digital integration across the Army, wider Defence, and primary allies. This will enable a fully networked Intelligence, Surveillance, Target Acquisition and Reconnaissance system consisting of multiple sensors, that can be centrally commanded and coordinated. Automation will be used to speed up decision-making and reduce electronic emissions between component parts. The architecture, platforms and sensors required for the system will be developed and acquired separately, with a series of common standards ensuring that they remain compatible with the network.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber. This is primarily due to the following factors: Positive progress has been made in recent months on resolving challenges, reducing key risks and increasing collaboration across the programme. Workforce resourcing remains a major concern that has a direct impact on delivery confidence, and on recruitment and retention of talent within the team.","startDate":"2019-01-25","endDate":"2027-12-31","scheduleNarrative":"The project end-date is 31 December 2027. This is primarily due to the following factors: The Programme entered the Government Major Projects Portfolio in Financial Year 2021/22, as such there is no baseline date recorded for March 21 for comparison.","fyBaseline":10.18,"fyForecast":7.57,"fyVariance":-30.0,"varianceNarrative":"The budget variance exceeds 5%. In-Year variance of c£2.6m due to sub-project Operational Analysis being incorrectly forecasted against the main equipment funding line rather than within operational expenditure, and as a result of delays to research and development activities","wholeLifeCost":1521.0,"costNarrative":"The projects Baseline Whole Life Cost is 1520.84 (£m). This is primarily due to the following factors: The AQUILA Formal Change Request has been implemented, reducing the Whole Life Cost. It is to be noted however that Evolutionary Capability Development future spiral development costs were not included within this Formal Change Request, though funding for this element is held within the AQUILA provision.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Workforce & capability"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber. This is primarily due to the following factors: Positive progress has been made in recent months on resolving challenges, reducing key risks and increasing collaboration across the programme. Workforce resourcing remains a major concern that has a direct impact on…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"MOD_0056_2122-Q3","year":2023,"name":"Land Intelligence, Surveillance, Target Acquisition and Reconnaissance (ISTAR)","department":"MOD","category":"Military Capability","description":"The Land Intelligence, Surveillance, Target Acquisition and Reconnaissance Programme will deliver an adaptable, robust and agile system that will enable the Army to find the enemy at range in all operational environments. The bedrock of the system will be an open system architecture, designed to be fully integrated with current and future communications and information systems to enable digital integration across the Army, wider Defence, and our primary allies. This will enable a fully networked Intelligence, Surveillance, Target Acquisition and Reconnaissance system consisting of multiple sensors, that can be centrally commanded and coordinated. Automation will be used to speed up decision-making and reduce electronic emissions between component parts. The architecture, platforms and sensors required for the system will be developed and acquired separately, with a series of common standards ensuring that they remain compatible with the network.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber (SRO rating). This is primarily due to the following factors. Delays across the sub-programmes have added time and cost, the delays have also affected the ability to synchronise outcomes across the programme. In the short-term, workforce churn and relative inexperience of new team members is likely to increase risk. Uncertainty over the timing and content of workstrands on which the programme is dependant is another significant driver of delivery confidence.","startDate":"2019-01-25","endDate":"2027-12-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2027-12-31. This is primarily due to the following factors. NA","fyBaseline":30.57,"fyForecast":24.51,"fyVariance":-20.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors: The delay to the Watchkeeper Mid Life Extension Strategic Outline Business Case","wholeLifeCost":1598.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 increased from 1521m. to 1598m. This is primarily due to the following factors. Delays and increased inflation and Foreign Exchange. The normal Formal Change Request process has turned planning assumptions into more assured data which have refined costs and time in several sub-programmes.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This programme does not report cashable benefits. Its aim is to provision the armed forces with the equipment and / or infrastructure required.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber (SRO rating). This is primarily due to the following factors. Delays across the sub-programmes have added time and cost, the delays have also affected the ability to synchronise outcomes across the programme. In the short-term, workforce churn and…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"MOD_0056_2122-Q3","year":2024,"name":"Land Intelligence, Surveillance, Target Acquisition and Reconnaissance (ISTAR)","department":"MOD","category":"Military Capability","description":"The Land Intelligence, Surveillance, Target Acquisition and Reconnaissance (ISTAR) Programme will deliver an adaptable, robust and agile system that will enable the Army to find the enemy at range in all operational environments. The bedrock of the system will be an open system architecture; designed to be fully integrated with current and future communications and information systems to enable digital integration across the Army, wider Defence, and our primary allies. This will enable a fully networked ISTAR system consisting of multiple sensors, that can be centrally commanded and coordinated. Automation will be used to speed up decision-making and reduce electronic emissions between component parts. The architecture, platforms and sensors required for the system will be developed and acquired separately, with a series of common standards ensuring that they remain compatible with the network.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The lack of sufficient workforce is the single largest factor affecting delivery confidence. Additionally, industrial capacity and complex dependencies have added time and cost, affecting the ability to synchronise outcomes across the programme.","startDate":"2019-01-25","endDate":"2027-12-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained scheduled to finish on 2027-12-31. This is primarily due to the following factors. Though other sub-programme schedules within the overall programme have been delayed, ZODIAC, the core element, remains on track for delivery. The factors behind delays for other sub-programmes include delay to approvals and subsequent re-planning activities, complexity and sequencing of dependencies with other programmes, and the wider resource capacity issues in Army, delivery agents and the MOD.","fyBaseline":69.9,"fyForecast":48.61,"fyVariance":-30.458,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The programme did not spend its allocated budget due to delays in all four major sub-programmes. Key external factors were approvals delays (notably with SERPENS), industrial capacity and a dynamic requirement set. Internally, under-resourcing of workforce limited the pace of work and the ability to respond to change.","wholeLifeCost":1800.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 increased from 1598m to 1800m. This is primarily due to the following factors. Schedule slips have increased costs due to inflation and longer duration of standing programme delivery costs. Further cost growth is a result of additional clarity on costs as sub-programmes have matured.","benefits":0.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 0m.","themes":["Cost & funding","Delivery & schedule","Workforce & capability","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The lack of sufficient workforce is the single largest factor affecting delivery confidence. Additionally, industrial capacity and complex dependencies have added time and…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"MOD_0056_2122-Q3","year":2025,"name":"LAND INTELLIGENCE, SURVEILLANCE, TARGET ACQUISITION AND RECONNAISSANCE (ISTAR)","department":"MoD","category":"Military Capability","description":"The Land Intelligence, Surveillance, Target Acquisition and Reconnaissance (ISTAR) Programme will deliver an adaptable, robust and agile system that will enable the Army to find the enemy at range in all operational environments. The bedrock of the system will be an open system architecture, designed to be fully integrated with current and future communications and information systems to enable digital integration across the Army, wider Defence, and our primary allies. This will enable a fully networked ISTAR system consisting of multiple sensors, that can be centrally commanded and coordinated. Automation will be used to speed up decision-making and Reduce electronic emissions between component parts. The architecture, platforms and sensors required for the system will be developed and acquired separately, with a series of common standards ensuring that they remain compatible with the network.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is RED, compared with the project's assessment last year of AMBER. This is due to the following factors. The lack of sufficient workforce is the single largest factor affecting delivery confidence, and the outlook is for a improving position over the next year if anticipated workforce increase comes to fruition. A period of adaptation will be required when new resource arrives which may keep Confidence rating low as workforce augmentation. Delays have impacted across the sub-programmes due to awaiting approvals, industrial capacity and dependencies which have added time and cost. The delays have also affected the ability to synchronise outcomes across the programme. In the short-term the workforce churn and relative inexperience of new team members is likely to further increase risk.","startDate":"2019-01-25","endDate":"2027-12-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/12/2027.","fyBaseline":86.35,"fyForecast":38.28,"fyVariance":55.67,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The programme did not spend its allocated budget due to delays in four major sub-programmes. Key external factors were approvals delays, industrial capacity and a dynamic requirement set. Internally, under-resourcing of workforce limited the pace of work and the ability to respond to change. Delays due to contract milestones play a big part in the variance.","wholeLifeCost":1878.28,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 1800 to 1878. This is primarily due to the following factors. In year spending measures have led to reprofiling of funds, as well as underspend due to workforce measures - in particular ZODIAC Resource Departmental Expenditure Limits (RDEL). Furthermore, schedule slips have increased costs due to inflation and an increase in the duration of standing programme delivery costs.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits","themes":["Workforce & capability","Cost & funding","Delivery & schedule","Commercial & supply chain"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is RED, compared with the project's assessment last year of AMBER. This is due to the following factors. The lack of sufficient workforce is the single largest factor affecting delivery confidence, and the outlook is for a improving position over the next year if…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"MOD_0056_2122-Q3","year":2026,"name":"LAND INTELLIGENCE, SURVEILLANCE, TARGET ACQUISITION AND RECONNAISSANCE (ISTAR)","department":"MOD","category":"Military Capability","description":"The Land Intelligence, Surveillance, Target Acquisition and Reconnaissance (ISTAR) Programme will deliver an adaptable, robust and agile system that will enable the Army to find the enemy at range in all operational environments. The bedrock of the system will be an open system architecture, designed to be fully integrated with current and future communications and information systems to enable digital integration across the Army, wider Defence, and our primary allies. This will enable a fully networked ISTAR system consisting of multiple sensors, that can be centrally commanded and coordinated. Automation will be used to speed up decision-making and reduce electronic emissions between component parts. The architecture, platforms and sensors required for the system will be developed and acquired separately, with a series of common standards ensuring that they remain compatible with the network.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 increased to Amber. This is primarily due to the following factors. 1. Delivery of the SRO’s Get Well Plan, including work done by the Programme Design and Integration Office on a digital ecosystem within Defence. This progress was achieved despite challenges with workforce capacity in the delivery teams and the wider complexities within Defence. 2. The improvement on the previous year’s assessment and confirmed by the Dec 2025 NISTA Assurance Review.","startDate":"2019-01-25","endDate":"2033-05-02","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 31/12/2027.","fyBaseline":79.13,"fyForecast":51.8,"fyVariance":34.54,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. 1. The programme did not spend its allocated budget due to delays in four major sub-programmes. 2. Key external factors were approvals delays, industrial capacity and a dynamic requirement set. Internally, under-resourcing of workforce limited the pace of work and the ability to respond to change. 3. Delays due to contract milestones play a big part in the variance. Delays to approvals pushing profile to the right. 4. The Watchkeeper Mid-Life Extension project has been deleted from the programme.","wholeLifeCost":1498.14,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) decreased from £1878.28M to £1622.50M This is primarily due to the following factors. 1. The Programme’s Whole Life Cost has reduced overall compared to 12 months ago. The reduction is driven primarily by Defence Board-approved requirement and scope changes, with costings removed in line with updated commissioning instructions. 2. Further decreases arise from reprofiling of assessment and delivery activity into later years due to approval and negotiation delays, incomplete achievement of system requirements, and delayed receipt of subcontractor software, resulting in Annual Budgeting Cycle impacts largely into Financial Year 26/27. 3. These reductions are partially offset by increases associated with updated Full Business Case 3 cost models using preferred bidder pricing, which has driven higher upfront support costs to enable accelerated Minimum Deployable Capability delivery, alongside minor revised estimates of cost for additional training requirements. 4. In addition, an underspend against forecast has been realised due to workforce control measures, particularly within ZODIAC RDEL, contributing to the overall reduction in Whole Life Cost. 5. Overall, movements reflect disciplined cost control, alignment to approved scope, and realistic reprofiling in line with delivery maturity.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4; the projects departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the fact that the benefits are not monetised.","themes":["Cost & funding","Delivery & schedule","Workforce & capability","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 increased to Amber. This is primarily due to the following factors. 1. Delivery of the SRO’s Get Well Plan, including work done by the Programme Design and Integration Office on a digital ecosystem within Defence. This progress was achieved despite…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"MOD_0056_2122-Q3","year":2025,"name":"LAND INTELLIGENCE, SURVEILLANCE, TARGET ACQUISITION AND RECONNAISSANCE (ISTAR)","department":"MoD","category":"Military Capability","description":"The Land Intelligence, Surveillance, Target Acquisition and Reconnaissance (ISTAR) Programme will deliver an adaptable, robust and agile system that will enable the Army to find the enemy at range in all operational environments. The bedrock of the system will be an open system architecture, designed to be fully integrated with current and future communications and information systems to enable digital integration across the Army, wider Defence, and our primary allies. This will enable a fully networked ISTAR system consisting of multiple sensors, that can be centrally commanded and coordinated. Automation will be used to speed up decision-making and Reduce electronic emissions between component parts. The architecture, platforms and sensors required for the system will be developed and acquired separately, with a series of common standards ensuring that they remain compatible with the network.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is RED, compared with the project's assessment last year of AMBER. This is due to the following factors. The lack of sufficient workforce is the single largest factor affecting delivery confidence, and the outlook is for a improving position over the next year if anticipated workforce increase comes to fruition. A period of adaptation will be required when new resource arrives which may keep Confidence rating low as workforce augmentation. Delays have impacted across the sub-programmes due to awaiting approvals, industrial capacity and dependencies which have added time and cost. The delays have also affected the ability to synchronise outcomes across the programme. In the short-term the workforce churn and relative inexperience of new team members is likely to further increase risk.","startDate":"2019-01-25","endDate":"2027-12-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/12/2027.","fyBaseline":86.35,"fyForecast":38.28,"fyVariance":55.67,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The programme did not spend its allocated budget due to delays in four major sub-programmes. Key external factors were approvals delays, industrial capacity and a dynamic requirement set. Internally, under-resourcing of workforce limited the pace of work and the ability to respond to change. Delays due to contract milestones play a big part in the variance.","wholeLifeCost":1878.28,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 1800 to 1878. This is primarily due to the following factors. In year spending measures have led to reprofiling of funds, as well as underspend due to workforce measures - in particular ZODIAC Resource Departmental Expenditure Limits (RDEL). Furthermore, schedule slips have increased costs due to inflation and an increase in the duration of standing programme delivery costs.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits","themes":["Workforce & capability","Cost & funding","Delivery & schedule","Commercial & supply chain"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is RED, compared with the project's assessment last year of AMBER. This is due to the following factors. The lack of sufficient workforce is the single largest factor affecting delivery confidence, and the outlook is for a improving position over the next year if…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":-1,"transition":"Improved","endDateDeltaDays":1949,"attentionScore":50,"attentionReasons":["Current published delivery confidence is Amber","Published end date moved 1,949 days later","In-year forecast variance is +34.5%"]},{"id":"MHCLG_0005_2021-Q4","year":2026,"name":"UK HOLOCAUST MEMORIAL AND LEARNING CENTRE","department":"MHCLG","category":"Infrastructure and Construction","description":"To build a striking new memorial to the Holocaust in Victoria Tower Gardens in Westminster to honour the six million Jewish men, women and children that were murdered during the Holocaust, as well as other victims of Nazi persecution. A Learning Centre will be located with the memorial to explore the British relationship to the Holocaust including the role of the British Parliament and democratic institutions.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at RED. The nominated Minister will need to retake the planning decision before the Programme can proceed to construction.","startDate":"2015-01-27","endDate":null,"scheduleNarrative":"Exempt under Section 35 - Formulation of government policy","fyBaseline":5.13,"fyForecast":2.3,"fyVariance":55.21,"varianceNarrative":"The budget variance exceeds 5% due to programme slippage. The key reason for delay is that the UK Holocaust Memorial & Learning Centre Programme is awaiting a decision on its planning application, which is required before construction can proceed.","wholeLifeCost":141.87,"costNarrative":"The WLC has increased by £4m primarily due to a longer programme, and unforeseen design costs and adjustments for inflation in real terms.","benefits":null,"benefitsNarrative":"The project does not focus on monetised benefits. Non-monetised benefits include the UK having a national Memorial to the Holocaust where people can pay their respects and reflect on the impact and enormity of the Holocaust. The Learning Centre will allow visitors to understand the importance of the Holocaust in British history, with increased awareness of subsequent genocides and antisemitism.","themes":["Approvals & decisions","Delivery & schedule","Commercial & supply chain","Cost & funding"],"evidenceExcerpt":"The SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at RED. The nominated Minister will need to retake the planning decision before the Programme can proceed to construction. Exempt under Section 35 - Formulation of government policy","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"MHCLG_0005_2021-Q4","year":2021,"name":"UK Holocaust Memorial & Learning Centre Programme","department":"MHCLG","category":"Infrastructure and Construction","description":"To build a striking new memorial to the Holocaust in Victoria Tower Gardens in Westminster to honour the six million Jewish men, women and children that were murdered during the Holocaust, as well as other victims of Nazi persecution. A Learning Centre to be located with the memorial to explore the British relationship to the Holocaust including the role of the British Parliament, other institutions and wider society.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 35 of the Freedom of Information Act 2000 (formulation of government policy)","startDate":"2015-01-27","endDate":null,"scheduleNarrative":"Exempt under Section 35 of the Freedom of Information Act 2000 (formulation of government policy)","fyBaseline":9.46,"fyForecast":3.6,"fyVariance":null,"varianceNarrative":"Exempt under Section 35 of the Freedom of Information Act 2000 (formulation of government policy)","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"","themes":["Commercial & supply chain"],"evidenceExcerpt":"Exempt under Section 35 of the Freedom of Information Act 2000 (formulation of government policy) Exempt under Section 35 of the Freedom of Information Act 2000 (formulation of government policy)","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21"},{"id":"MHCLG_0005_2021-Q4","year":2022,"name":"UK Holocaust Memorial and Learning Centre","department":"DLUHC","category":"Infrastructure and Construction","description":"The programme aims to build a striking new memorial to the Holocaust in Victoria Tower Gardens in Westminster to honour the six million Jewish men, women and children who were murdered during the Holocaust, as well as other victims of Nazi persecution. A Learning Centre will be located with the memorial to explore the British relationship to the Holocaust, including the role of the British Parliament and democratic institutions.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 2020/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating for at 21/22-Q4 was Red. A Statutory Review hearing was held in February 2022 on the planning consent awarded in July 2021. The High Court Judgment quashed the planning consent. The Department has sought leave to appeal this decision. Prior to this the programme had been rated as Amber.","startDate":"2015-01-27","endDate":null,"scheduleNarrative":"A Statutory Review hearing was held on the February 2022 on the planning consent awarded in July 2021. The judgment quashed the planning consent. The Department has sought leave to appeal this decision. * Dates are exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","fyBaseline":10.54,"fyForecast":2.44,"fyVariance":-77.0,"varianceNarrative":"The budget variance exceeds 5%. The delay caused by the legal processes has resulted in less expenditure than originally planned.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"","themes":["Approvals & decisions","Commercial & supply chain","Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 2020/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating for at 21/22-Q4 was Red. A Statutory Review hearing was held in February 2022 on the planning consent awarded in July 2021. The High Court Judgment quashed the planning consent. The Department has sought leave to appeal this decision. Prior to…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"MHCLG_0005_2021-Q4","year":2023,"name":"UK Holocaust Memorial and Learning Centre","department":"DLUHC","category":"Infrastructure and Construction","description":"The programme aims to build a striking new memorial to the Holocaust in Victoria Tower Gardens in Westminster to honour the six million Jewish men, women and children that were murdered during the Holocaust, as well as other victims of Nazi persecution. A Learning Centre will be located with the memorial to explore the British relationship to the Holocaust including the role of the British Parliament and democratic institutions.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 remained at Red (SRO rating). This is primarily due to the following factors. The Holocaust Memorial Bill was introduced on the 23 February 2023 to remove the statutory obstacle to planning and is proceeding through Parliament. The nominated Minister will need to retake the planning decision. The DLUHC Permanent Secretary wrote to the Secretary of State, who in return issued a ministerial direction that instructs the Permanent Secretary to continue to authorise expenditure as required on the Holocaust Memorial and Learning Centre programme, ahead of Royal Assent for the Holocaust Memorial Bill and the activation of the spending power contained within it. A revised Full Business Case went back to the DLUHC Investment Sub-Committee requesting an increased budget and contingency due to delays and construction inflation. The Accounting Officer (AO) assessment was published in August 2022, and a revised version is due to be published in 2023.","startDate":"2015-01-27","endDate":null,"scheduleNarrative":"The programme schedule has slipped due to the continuing planning process. We need the UK Holocaust Memorial Bill to receive Royal Assent and the nominated Minister to retake the planning decision, to allow the programme schedule to be defined. Once we are in a position to award construction contracts, we will work with the selected suppliers to identify any opportunities to reduce the construction timetable.","fyBaseline":23.1,"fyForecast":2.24,"fyVariance":-90.0,"varianceNarrative":"The budget variance exceeds 5%. The underspend is a result of the programme being unable to move into the construction phase as planned, due to the overturning of the planning decision in April 2022, with costs being pushed into future years as a result.","wholeLifeCost":124.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 22/23-Q4 is 124m. This is primarily due to the following factors. The Baseline costs remain unchanged and are based on the Full Business Case (FBC). The baseline will be reset upon approval of the revised FBC which anticipates increased costs primarily due to programme delays and inflation.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. The project did not provide departmental-agree monetised benefits at 22/23-Q4. The programme does not have any monetised benefits. Non-monetised benefits will be that the UK has a suitable national Memorial to the Holocaust, a place where people can pay their respects, contemplate, think and offer prayers, which conveys the enormity of the Holocaust and its impact, and which appropriately represents the fate of other victims of Nazi persecution. The Learning Centre will provide a memorable experience that will give visitors an increased understanding of the importance of the Holocaust in British history, increased awareness of subsequent genocides, and increased awareness of antisemitism.","themes":["Approvals & decisions","Cost & funding","Delivery & schedule","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 remained at Red (SRO rating). This is primarily due to the following factors. The Holocaust Memorial Bill was introduced on the 23 February 2023 to remove the statutory obstacle to planning and is proceeding through Parliament. The nominated Minister will need to…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"MHCLG_0005_2021-Q4","year":2024,"name":"UK Holocaust Memorial and Learning Centre","department":"DLUHC","category":"Infrastructure and Construction","description":"The objective of the UK Holocaust Memorial and Learning Centre programme is to build a new memorial to the Holocaust in Victoria Tower Gardens in Westminster to honour the six million Jewish men, women and children that were murdered during the Holocaust. A learning centre will also be located with the memorial to explore the British relationship to the Holocaust, including the role of the British Parliament and democratic institutions.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Red. This is primarily due to the following factors. As at March 24: We continue to assess the delivery confidence of the programme as red. This is because the programme does not yet have planning consent. The Holocaust Memorial Bill was introduced in the House of Commons on the 23 February 2023 remove the obstacle to planning consent, and passed Second Reading unopposed in June 2023. When the Bill is passed, this status is expected to change.","startDate":"2015-01-27","endDate":"2029-01-31","scheduleNarrative":"The project's end-date at 23/24-Q4 is 2029-01-31. This is primarily due to the following factors. As at March 24: The project's end-date is January 2029.","fyBaseline":8.0,"fyForecast":1.45,"fyVariance":-82.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. Some costs have moved into future financial years.","wholeLifeCost":138.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 increased from 124m. to 138m. This is primarily due to the following factors. Whole Life Costs increased from 124m to 138m as agreed in a revised business case, due to programme delays and inflation.","benefits":0.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 0m. Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 0m.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Red. This is primarily due to the following factors. As at March 24: We continue to assess the delivery confidence of the programme as red. This is because the programme does not yet have planning consent. The Holocaust Memorial…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"MHCLG_0005_2021-Q4","year":2025,"name":"UK HOLOCAUST MEMORIAL AND LEARNING CENTRE","department":"MHCLG","category":"Infrastructure and Construction","description":"To build a striking new memorial to the Holocaust in Victoria Tower Gardens in Westminster to honour the six million Jewish men, women and children that were murdered during the Holocaust, as well as other victims of Nazi persecution. A Learning Centre will be located with the memorial to explore the British relationship to the Holocaust including the role of the British Parliament and democratic institutions.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at RED. This is primarily due to the following factors‚ The Holocaust Memorial Bill is going through Parliament to remove the statutory obstacle to planning consent. After the Bill has received Royal Assent, the nominated Minister will need to retake the planning decision.","startDate":"2015-01-27","endDate":null,"scheduleNarrative":"Section 35 - Formulation of government policy","fyBaseline":3.37,"fyForecast":1.79,"fyVariance":46.88,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The passage of the Holocaust Memorial Bill took longer than expected, pushing back the estimated planning permission date and forecast spend on construction.","wholeLifeCost":142.88,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 138 to 142. This is primarily due to the following factors‚ Forecast costs increased due to delays to the programme, legal costs for the Holocaust Memorial Bill, provision for inflation and additional design costs.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ The project does not focus on monetised benefits. Non-monetised benefits include the UK having a national Memorial to the Holocaust where people can pay their respects and reflect on the impact and enormity of the Holocaust. The Learning Centre will allow visitors to understand the importance of the Holocaust in British history, with increased awareness of subsequent genocides and antisemitism.","themes":["Cost & funding","Approvals & decisions","Commercial & supply chain","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at RED. This is primarily due to the following factors‚ The Holocaust Memorial Bill is going through Parliament to remove the statutory obstacle to planning consent. After the Bill has received Royal Assent, the nominated…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"MHCLG_0005_2021-Q4","year":2026,"name":"UK HOLOCAUST MEMORIAL AND LEARNING CENTRE","department":"MHCLG","category":"Infrastructure and Construction","description":"To build a striking new memorial to the Holocaust in Victoria Tower Gardens in Westminster to honour the six million Jewish men, women and children that were murdered during the Holocaust, as well as other victims of Nazi persecution. A Learning Centre will be located with the memorial to explore the British relationship to the Holocaust including the role of the British Parliament and democratic institutions.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at RED. The nominated Minister will need to retake the planning decision before the Programme can proceed to construction.","startDate":"2015-01-27","endDate":null,"scheduleNarrative":"Exempt under Section 35 - Formulation of government policy","fyBaseline":5.13,"fyForecast":2.3,"fyVariance":55.21,"varianceNarrative":"The budget variance exceeds 5% due to programme slippage. The key reason for delay is that the UK Holocaust Memorial & Learning Centre Programme is awaiting a decision on its planning application, which is required before construction can proceed.","wholeLifeCost":141.87,"costNarrative":"The WLC has increased by £4m primarily due to a longer programme, and unforeseen design costs and adjustments for inflation in real terms.","benefits":null,"benefitsNarrative":"The project does not focus on monetised benefits. Non-monetised benefits include the UK having a national Memorial to the Holocaust where people can pay their respects and reflect on the impact and enormity of the Holocaust. The Learning Centre will allow visitors to understand the importance of the Holocaust in British history, with increased awareness of subsequent genocides and antisemitism.","themes":["Approvals & decisions","Delivery & schedule","Commercial & supply chain","Cost & funding"],"evidenceExcerpt":"The SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at RED. The nominated Minister will need to retake the planning decision before the Programme can proceed to construction. Exempt under Section 35 - Formulation of government policy","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"MHCLG_0005_2021-Q4","year":2025,"name":"UK HOLOCAUST MEMORIAL AND LEARNING CENTRE","department":"MHCLG","category":"Infrastructure and Construction","description":"To build a striking new memorial to the Holocaust in Victoria Tower Gardens in Westminster to honour the six million Jewish men, women and children that were murdered during the Holocaust, as well as other victims of Nazi persecution. A Learning Centre will be located with the memorial to explore the British relationship to the Holocaust including the role of the British Parliament and democratic institutions.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at RED. This is primarily due to the following factors‚ The Holocaust Memorial Bill is going through Parliament to remove the statutory obstacle to planning consent. After the Bill has received Royal Assent, the nominated Minister will need to retake the planning decision.","startDate":"2015-01-27","endDate":null,"scheduleNarrative":"Section 35 - Formulation of government policy","fyBaseline":3.37,"fyForecast":1.79,"fyVariance":46.88,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The passage of the Holocaust Memorial Bill took longer than expected, pushing back the estimated planning permission date and forecast spend on construction.","wholeLifeCost":142.88,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 138 to 142. This is primarily due to the following factors‚ Forecast costs increased due to delays to the programme, legal costs for the Holocaust Memorial Bill, provision for inflation and additional design costs.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ The project does not focus on monetised benefits. Non-monetised benefits include the UK having a national Memorial to the Holocaust where people can pay their respects and reflect on the impact and enormity of the Holocaust. The Learning Centre will allow visitors to understand the importance of the Holocaust in British history, with increased awareness of subsequent genocides and antisemitism.","themes":["Cost & funding","Approvals & decisions","Commercial & supply chain","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at RED. This is primarily due to the following factors‚ The Holocaust Memorial Bill is going through Parliament to remove the statutory obstacle to planning consent. After the Bill has received Royal Assent, the nominated…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":null,"attentionScore":50,"attentionReasons":["Current published delivery confidence is Red","In-year forecast variance is +55.2%"]},{"id":"MOD_0124_2021-Q4","year":2026,"name":"MINE HUNTING CAPABILITY","department":"MOD","category":"Military Capability","description":"Mine Hunting Capability (MHC) will provide an agile, interoperable, and survivable capability using emerging Maritime Autonomous Systems (MAS) that enables strategic, operational, and tactical freedom of manoeuvre and exploitation of the battle space in order to assure and sustain the delivery of Maritime Force Projection and Maritime Security capabilities at the time and place of the UK’s choosing across the range of Standing Commitments and Operations, by defeating static underwater threats. The aim of MHC is to deliver a managed transition from current Mine Counter Measures Vessels (MCMV) to future MAS capabilities whilst sustaining and, where possible, improving capability delivery to provide military effect in accordance with extant Policy assumptions. The pace and nature of change is dictated by out-of-service dates for current MCMVs, by affordability issues, and by recognised capability shortfalls measured against an evolving requirement and threat. The intention is to transform current Mine Counter Measures thinking in order to enable these capabilities to be deployed differently, and more economically and effectively.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Exempt under Section 27 - International relations","startDate":"2014-10-01","endDate":"2034-03-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 31/03/2034.","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Compared to financial year 2024/25-Q4, the project's departmental-agreed monetised benefits at 2025/26-Q4 remained at £0m.","themes":["Commercial & supply chain","Cost & funding"],"evidenceExcerpt":"Exempt under Section 27 - International relations Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 31/03/2034.","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"MOD_0124_2021-Q4","year":2021,"name":"Mine Hunting Capability","department":"MOD","category":"Military Capability","description":"The Mine Hunting Capability Programme will�provide an agile, interoperable and survivable capability using emerging Maritime Autonomous Systems that enables strategic, operational and tactical freedom of manoeuvre and exploitation of the battle space in order to assure and sustain the delivery of Maritime Force Projection and Maritime Security capabilities at the time and place of the United Kingdom's choosing across the range of Standing Commitments and Operations, by: Defeating static underwater threats; Collecting, processing and disseminating oceanographic intelligence.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber/red.This is primarily due to the following factors: Following approval of the Outline Business Case in Q4 2020, the main contracts were placed for Block 1 Mission Systems. These are due to reach initial operating capability in 2024 and are on track to do so. At the end of 2020, the Senior Responsible Owner-ship of Mine Countermeasure and Hydrographic Craft Capability was transferred to the new Navy Acquisition Directorate. The Senior Responsible Owner is being supported on a \"best efforts\" basis by the Navy Equipment and Systems Portfolio Management Office organisation pending approval to recruit a Programme Management Team to support this programme. The risk to programme delivery has thus increased owing to limitations in the capacity to mature programme controls and governance.","startDate":"2014-10-01","endDate":"2030-06-30","scheduleNarrative":"The project end-date is 30 June 2030. This is primarily due to the following factors: The schedule is broadly on track. There are some risks around industry delivery dates which are being closely managed by the team and the impacts can currently be managed within the schedule.","fyBaseline":20.37,"fyForecast":19.2,"fyVariance":-6.0,"varianceNarrative":"The budget variance exceeds 5%. Some modest investment has been made to initiate this programme, the business cases that will set out the required level of investment and budgetary requirements are being developed at pace. This will be disclosed to a public audience if it is appropriate to do so while respecting any commercial or security sensitivities.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"","themes":["Delivery & schedule","Workforce & capability","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber/red.This is primarily due to the following factors: Following approval of the Outline Business Case in Q4 2020, the main contracts were placed for Block 1 Mission Systems. These are due to reach initial operating capability in 2024 and are on track to do so. At the end of…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21"},{"id":"MOD_0124_2021-Q4","year":2022,"name":"Mine Hunting Capability","department":"MOD","category":"Military Capability","description":"The mine hunting Capability Programme will provide an agile, interoperable and survivable capability using emerging Maritime Autonomous Systems that enables strategic, operational and tactical freedom of manouvre and exploitation of the battle space in order to assure and sustain the delivery of Maritime Force Projection and Maritime Security capabilities at the time and place of the UK's choosing across the range of Standing Commitments and Operations, by defating static underwater threats.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating increased from Amber/Red to Amber. This is primarily due to the following factors: The removal of the incremental Amber/Green and Amber/Red assessment ratings. The procurement of an additional Uncrewed Surface Vessel, with Towed Side Scan Sonar and an associated Portable Operations Centre, will enable the deployment of an interim taskable capability to the Gulf Q1 23. This aligns with original timelines.","startDate":"2014-10-01","endDate":"2034-03-31","scheduleNarrative":"Compared to 2021-Q4, the project end-date increased from 30 June 30 to 31 March 34. This is primarily due to the following factors: The programmes end date has been updated to deliver the additional Mission System 6.","fyBaseline":89.6,"fyForecast":83.72,"fyVariance":-6.0,"varianceNarrative":"The budget variance exceeds 5%. This was due to a re-profile and slippage of some activities into the next Financial Year. However, there is an expectation for this variance to reduce and be lower than 5% at Q4 22-23. This reduction is dependent on third party accruals evidence being submitted on time by suppliers to support accruals.","wholeLifeCost":459.0,"costNarrative":"Compared to 2021-Q4, the projects baseline Whole Life Cost increased from 146.58(£m) to 458.65(£m). This is primarily due to the following factors: The management of Private Sector Support has been adjusted to maximise their value and contribution. This resulted in a slight variance of Control Total being removed which is currently being reconciled.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating increased from Amber/Red to Amber. This is primarily due to the following factors: The removal of the incremental Amber/Green and Amber/Red assessment ratings. The procurement of an additional Uncrewed Surface Vessel, with Towed Side Scan Sonar…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"MOD_0124_2021-Q4","year":2023,"name":"Mine Hunting Capability","department":"MOD","category":"Military Capability","description":"","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. Resourcing challenges, predominantly with the infrastructure and logistics lines of development, and the impact of poor supplier performance on Block 1 in delivering Mission Systems for Operational Evaluation.","startDate":"2014-10-01","endDate":"2034-03-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2034-03-31. This is primarily due to the following factors. NA","fyBaseline":102.45,"fyForecast":102.44,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This programme does not report cashable benefits. Its aim is to provision the armed forces with the equipment and / or infrastructure required.","themes":["Commercial & supply chain","Cost & funding","Delivery & schedule","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. Resourcing challenges, predominantly with the infrastructure and logistics lines of development, and the impact of poor supplier performance on Block 1 in delivering…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"MOD_0124_2021-Q4","year":2024,"name":"Mine Hunting Capability","department":"MOD","category":"Military Capability","description":"The Mine Hunting Programme will provide an agile, interoperable, and survivable capability using emerging Maritime Autonomous Systems. This will enable strategic, operational and tactical freedom of manoeuvre and exploitation of the battle space, in order to assure and sustain the delivery of Maritime Force Projection and Maritime Security capabilities, at the time and place of the UK’s choosing across the range of Standing Commitments and Operations, by defeating static underwater threats. The aim is to deliver a managed transition from current Mine Counter Measures Vessels to future Maritime Autonomous Systems capabilities whilst sustaining and, where possible, improving capability delivery.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remains at Amber. This is primarily due to the following factors. Historical poor supplier performance on Block 1.","startDate":"2014-10-01","endDate":"2034-03-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the programme's end-date at 23/24-Q4 remains at 2034-03-31. This is primarily due to the following factors. Operational Evaluation Unit has deployed to the Gulf and Offshore Support Vessel has delivered to Devonport in accordance with the schedule. Despite challenges, Block 1 remains on scheduled to conclude within approval.","fyBaseline":44.3,"fyForecast":30.4,"fyVariance":-31.377,"varianceNarrative":"The budget variance exceeds 5% this is primarily due to the following factors. Contractor performance and reprioritisation on MHC Block 1, which has required some re-profiling after prioritisation of Autonomous Underwater Vehicle re-role activity. This has been reprofiled into future years as part of a Programme Cost Review.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.)","benefits":0.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 0m.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remains at Amber. This is primarily due to the following factors. Historical poor supplier performance on Block 1. Compared to financial year 22/23-Q4, the programme's end-date at 23/24-Q4 remains at 2034-03-31. This is primarily due to the…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"MOD_0124_2021-Q4","year":2025,"name":"MINE HUNTING CAPABILITY","department":"MoD","category":"Military Capability","description":"To provide an agile, interoperable, and survivable capability using emerging Maritime Autonomous Systems (MAS) that enables strategic, operational, and tactical freedom of manoeuvre and exploitation of the battle space in order to assure and sustain the delivery of Maritime Force Projection and Maritime Security capabilities at the time and place of the UK’s choosing across the range of Standing Commitments and Operations, by defeating static underwater threats. The aim of Mine Hunting Capability (MHC) is to deliver a managed transition from current Mine Counter Measures Vessels (MCMV) to future MAS capabilities whilst sustaining and, where possible, improving capability delivery to provide military effect in accordance with extant Policy assumptions. The pace and nature of change is dictated by out-of-service dates for current MCMVs, by affordability issues, and by recognised capability shortfalls measured against an evolving requirement and threat. The intention is to transform current Mine Counter Measures thinking in order to enable these capabilities to be deployed differently, and more economically and effectively. Key aims of the programme are to provide assured assure the safe operational deployment and return of the Continuous At Sea Deterrent and to deliver capability ‘in stride’ with a Maritime Task Group.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Section 27 - International relations","startDate":"2014-10-01","endDate":"2034-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2034.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 43 - Commercial interests","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Commercial & supply chain","Cost & funding"],"evidenceExcerpt":"Section 27 - International relations Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2034.","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"MOD_0124_2021-Q4","year":2026,"name":"MINE HUNTING CAPABILITY","department":"MOD","category":"Military Capability","description":"Mine Hunting Capability (MHC) will provide an agile, interoperable, and survivable capability using emerging Maritime Autonomous Systems (MAS) that enables strategic, operational, and tactical freedom of manoeuvre and exploitation of the battle space in order to assure and sustain the delivery of Maritime Force Projection and Maritime Security capabilities at the time and place of the UK’s choosing across the range of Standing Commitments and Operations, by defeating static underwater threats. The aim of MHC is to deliver a managed transition from current Mine Counter Measures Vessels (MCMV) to future MAS capabilities whilst sustaining and, where possible, improving capability delivery to provide military effect in accordance with extant Policy assumptions. The pace and nature of change is dictated by out-of-service dates for current MCMVs, by affordability issues, and by recognised capability shortfalls measured against an evolving requirement and threat. The intention is to transform current Mine Counter Measures thinking in order to enable these capabilities to be deployed differently, and more economically and effectively.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Exempt under Section 27 - International relations","startDate":"2014-10-01","endDate":"2034-03-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 31/03/2034.","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Compared to financial year 2024/25-Q4, the project's departmental-agreed monetised benefits at 2025/26-Q4 remained at £0m.","themes":["Commercial & supply chain","Cost & funding"],"evidenceExcerpt":"Exempt under Section 27 - International relations Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 31/03/2034.","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"MOD_0124_2021-Q4","year":2025,"name":"MINE HUNTING CAPABILITY","department":"MoD","category":"Military Capability","description":"To provide an agile, interoperable, and survivable capability using emerging Maritime Autonomous Systems (MAS) that enables strategic, operational, and tactical freedom of manoeuvre and exploitation of the battle space in order to assure and sustain the delivery of Maritime Force Projection and Maritime Security capabilities at the time and place of the UK’s choosing across the range of Standing Commitments and Operations, by defeating static underwater threats. The aim of Mine Hunting Capability (MHC) is to deliver a managed transition from current Mine Counter Measures Vessels (MCMV) to future MAS capabilities whilst sustaining and, where possible, improving capability delivery to provide military effect in accordance with extant Policy assumptions. The pace and nature of change is dictated by out-of-service dates for current MCMVs, by affordability issues, and by recognised capability shortfalls measured against an evolving requirement and threat. The intention is to transform current Mine Counter Measures thinking in order to enable these capabilities to be deployed differently, and more economically and effectively. Key aims of the programme are to provide assured assure the safe operational deployment and return of the Continuous At Sea Deterrent and to deliver capability ‘in stride’ with a Maritime Task Group.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Section 27 - International relations","startDate":"2014-10-01","endDate":"2034-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2034.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 43 - Commercial interests","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Commercial & supply chain","Cost & funding"],"evidenceExcerpt":"Section 27 - International relations Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2034.","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":0,"attentionScore":49,"attentionReasons":["Current published delivery confidence is Red","In-year forecast variance is +43.0%"]},{"id":"HMT_0004_2021-Q2","year":2026,"name":"NS&I Transformation","department":"HMT","category":"Government Transformation and Service Delivery","description":"The Business Transformation Programme (BTP) exists to modernise NS&I’s technology, operating model and supplier arrangements so that the organisation can continue to deliver safe, secure and reliable savings products while providing long‑term value for money to the taxpayer. The programme is designed to replace ageing, expensive, inflexible legacy systems and move NS&I towards a more cost-effective, resilient, scalable and digital‑first service, enabling it to respond effectively to changing customer needs, Government policy requirements and market conditions. In doing so, the programme aims to: - Reduce the long‑term cost of running the business, including Business‑as‑Usual operations and future change delivery - Improve customer experience and accessibility, supporting digital self‑service while ensuring provision for vulnerable or excluded customers - Increase operational resilience and security, including improved cyber security and continuity of service through transition and beyond - Strengthen NS&I’s agility and change capability, allowing faster, lower‑risk delivery of new products and policy‑driven change for HM Treasury Overall, the Business Transformation Programme underpins NS&I’s ambition to become the UK’s most trusted savings provider, with a sustainable delivery model that supports public services over the long term and aligns with Government Major Projects Portfolio (GMPP) expectations for value, resilience and capability.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Delivery confidence is assessed as RED because the programme cannot currently be delivered to agreed cost, schedule and scope without significant re‑planning and re‑baselining. There is no agreed, affordable end‑to‑end delivery plan, with delivery outcomes dependent on the resolution of active options analysis and future funding decisions. Confidence is further constrained by Spending Review affordability pressures, ongoing uncertainty around scope and sequencing, and the absence of a finalised, quantified benefits baseline. Until these issues are resolved and a preferred option is approved, delivery commitments cannot be made with confidence. Senior‑level intervention and agreement with HM Treasury are required to restore a credible baseline and improve delivery confidence.","startDate":"2019-06-03","endDate":null,"scheduleNarrative":"Exempt under Section 43 - Commercial interests","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Exempt under Section 43 - Commercial interests","themes":["Delivery & schedule","Commercial & supply chain","Cost & funding","Scope & requirements"],"evidenceExcerpt":"Delivery confidence is assessed as RED because the programme cannot currently be delivered to agreed cost, schedule and scope without significant re‑planning and re‑baselining. There is no agreed, affordable end‑to‑end delivery plan, with delivery outcomes dependent on the resolution of active options analysis and future funding decisions. Confidence is…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"HMT_0004_2021-Q2","year":2021,"name":"NS&I Rainbow","department":"HMT","category":"Government Transformation and Service Delivery","description":"The Programme has three key aims to; . Measurably reduce the costs of running the business; . Become a self-service digital business with support for the vulnerable and excluded; and . Deliver more nimbly, reduce risk and enhance scalability.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber.This is primarily due to the following factors: The SRO Delivery Confidence Assessment (DCA) rating at Q4 2021 (31st March 2021) was Amber, due primarily to the following factors; -The Programme has recently received approval to proceed into the Delivery Phase and is currently mobilising against a re-baselined Programme schedule. -The acquisition of key resources required to commence Programme and Project activities is underway and expect to increase.","startDate":"2019-06-03","endDate":"2024-07-31","scheduleNarrative":"The project end-date is 31 July 2024. This is primarily due to the following factors: The schedule baseline Programme end date at Q4 (31st March 2021) is 31 July 2024, has not changed since the Programme reported, due primarily to the following reasons; -The Programme has recently received approval to proceed into the Delivery Phase and has carried out a Programme schedule re-baselining exercise which concluded that there was no impact on the end Programme delivery date following changes to the approval date. Sub-Programme milestones were able to accommodate the delays as per the teams ability to maintain key deliverable activity outputs. -While the exercise was underway continued to work to deliver key Programme deliverables in line with the baseline plan with the available Programme resources.","fyBaseline":0.0,"fyForecast":0.0,"fyVariance":null,"varianceNarrative":"The GMPP project did not provide data","wholeLifeCost":1158.35,"costNarrative":"The projects Baseline Whole Life Cost is �1158.35m. This is primarily due to the following factors: The baseline Whole Life Cost at Q4 2021 (31st March) is �1158.35m. The baseline Whole Life Costs covers the period up to 2031.","benefits":null,"benefitsNarrative":"","themes":["Delivery & schedule","Cost & funding","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber.This is primarily due to the following factors: The SRO Delivery Confidence Assessment (DCA) rating at Q4 2021 (31st March 2021) was Amber, due primarily to the following factors; -The Programme has recently received approval to proceed into the Delivery Phase and is…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21"},{"id":"HMT_0004_2021-Q2","year":2022,"name":"NS&I Rainbow","department":"HMT","category":"Government Transformation and Service Delivery","description":"The Programmes has three key aims to; 1) Deliver a measurable reduction to the cost of running and changing the business, 2) Become a self-service digital business with support for the vulnerable and excluded, 3) Deliver more nimbly, reduce risks and enhance scalability.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 20/21-Q4, the Delivery Confidence Assessment rating at 21/22-Q4 remained at Amber We have successfully completed the procurement activity for procurement package A. We are currently in the procurement process on package B and we awaiting CDDO and CO approval to launch competitive dialogue for procurement C and D respectively. We have completed the addendum Outline Business Case refresh, which was presented to HMT on 17/03/2022. Resource increase is in the process of being prepared.","startDate":"2019-06-03","endDate":"2024-07-31","scheduleNarrative":"Compared to 2021-Q4, your project end-date remained scheduled to finish on 31 JUL 2024 . This is primarily due to the following factors: No Changes to the Milestones have been made to this stage of the programme. The Preparation work currently underway for the business case refresh will assist with identifying any key changes to the Milestones and will align to intra Project Timescale changes.","fyBaseline":48.9,"fyForecast":10.57,"fyVariance":-78.0,"varianceNarrative":"During 2019-20 and 2020-21 NS&I created and assessed a long list of options for how to proceed after the existing outsourcing contract ended in March 2024. This essential discovery activity eventually led to the creation of a Strategic Outline Business Case and an Outline Business Case (OBC). The Programme's ability to spend in line with our allocation and earlier forecasting has been impacted by factors including delays in onboarding required programme resources impacting delivery to the original schedule, particularly for PPA and PPB meaning associated costs will be incurred FY 22/23 instead of FY 21/22; Atos' capacity to deliver against the Transformation Programme schedule and anticipated deliverables (Including Progressive Transformation Projects); Operational recovery delaying progression of planned legacy data work; PPA contract award being rescheduled to April 22 impacting originally forecast supplier costs.","wholeLifeCost":1158.0,"costNarrative":"Compared to 2021-Q4,the projects Baseline Whole Life Cost remained at 1158.35 (£m). This is primarily due to the following factors: Compared to 2021-Q4, the Baseline Whole Life Cost remained at 1158.35 (£m). The WLC covers ten years and is based on the assumptions within our latest approved Outline Business Case.","benefits":null,"benefitsNarrative":"","themes":["Commercial & supply chain","Approvals & decisions","Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Delivery Confidence Assessment rating at 21/22-Q4 remained at Amber We have successfully completed the procurement activity for procurement package A. We are currently in the procurement process on package B and we awaiting CDDO and CO approval to launch competitive dialogue for procurement C and D respectively. We…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"HMT_0004_2021-Q2","year":2023,"name":"NS&I Rainbow","department":"HMT","category":"Government Transformation and Service Delivery","description":"The aims of the programme are to: 1. Measurably reduce the costs of running the business and growing revenue 2. Become a self-service digital business with support for the vulnerable and excluded 3. Deliver more nimbly, reduce risk and enhance scalability","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 decreased from Amber (SRO rating) to Red (IPA rating). This is primarily due to the following factors. Since the last update, we have been focussing on replanning to obtain a re-baselined plan while continuing to close out dialogue activities. The Programme is now reaching the conclusion of procurement activities (with PPB due to complete by late Summer 2023) and therefore we are preparing the activities required for the move into a delivery-focussed programme. Given this, we would expect the Delivery Confidence to start improving over the coming months as more elements of the plan start to crystalise. Funding will remain a key item, however. We have remained in close dialogue with DRM about the expected envelope and approvals timeline over the summer.","startDate":"2019-06-03","endDate":"2025-07-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 increased from 2024-07-31 to 2025-07-31. This is primarily due to the following factors. We have:-Successfully achieved operational readiness for Procurement Package A and delivery is in the final phase.Recently identified the optimum procurement route for package B and have replanned and rebase-lined the Programme accordingly. A 1 year continuance to the incumbent contract to cover the delays due to the failed PPB procurement has been approved by HMT.We are in the process of exiting Dialogue for packages C & D and will shortly be issuing invitations to submit final tenders.Identified the winning bidder for B2B package E and are in the process of consulting our clients.Appointed our delivery partners for Service Integration and Management (SIAM) and Technology Build.Work is now starting on preparing the Final Business Case and preparing for the IPA Gateway 3 in June.","fyBaseline":56.89,"fyForecast":35.75,"fyVariance":-37.0,"varianceNarrative":"The Programme's ability to spend in line with our allocations and earlier forecasting has been impacted by factors including delays in onboarding the required programme resource impacting delivery to the original schedule particular PPB meaning associated costs will be incurred in future years instead of FY 2022/2023","wholeLifeCost":1158.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 remained at 1158m. This is primarily due to the following factors. Since the 2021-22 Q4 submission, we have gained clarity on, and refined a number of the assumptions used in the financial model which has led to a revised whole life cost.Package A cost estimates are now based on the awarded IBM contract plus agreed change requests. The forecasts for the remaining three main procurement packages are based on initial bidder submissions with adjusted timings to reflect the current plan. The current plan assumes the existing provider, Atos, will provide termination assistance services during 2024-25. The greater certainty associated with the updated assumptions has enabled us to revise the optimism bias calculation. We also gained clarity on the VAT position following independent advice and made updates. In addition to these changes, we have updated inflation assumptions in line with latest ONS estimates.","benefits":590.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 590m. The project's departmental-agree monetised benefits at 22/23-Q4 is 590m.The project's departmental-agree monetised benefits at 22/23-Q4 is 590m.The project's departmental-agree monetised benefits at 22/23-Q4 is 590m. The Baseline Benefits are taken from the Outline Business Case. Benefits we noted at that time included:A reduction in FTE for delivery of the Customer Interaction Centre resulting from a move to more online self-service interactions.A reduction in FTE for back office operational processing as customers are able to complete more tasks online with fully automated processes.A reduction in print, paper and postage costs as customers move to paperless following online initiativesA reduction in debit card costs as customers move to more cost-efficient payment methodsA reduction in technology costs as we move to fully supported systems and less bespoke software.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Technical & integration"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 decreased from Amber (SRO rating) to Red (IPA rating). This is primarily due to the following factors. Since the last update, we have been focussing on replanning to obtain a re-baselined plan while continuing to close out dialogue activities. The Programme is now…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"HMT_0004_2021-Q2","year":2024,"name":"NS&I Rainbow","department":"HMT","category":"Government Transformation and Service Delivery","description":"\"The aims of the programme are to:_x000D_ 1. Measurably reduce the costs of running the business and growing revenue_x000D_ 2. Become a self-service digital business with support for the vulnerable and excluded_x000D_ 3. Deliver more nimbly, reduce risk and enhance scalability\"","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Red. This is primarily due to the following factors. Since the last annual update, the Programme has awarded further procurement packages and signed contracts for B2B Transition, Contact Centre and Operations (awarded to Sopra Steria Ltd.) and Digital Experience and Enablement (awarded to IBM). Delivery teams have mobilised to collaboratively develop detailed solution designs and plans for transitioning these services from NS&I's incumbent, Atos to NS&I's new strategic delivery partners. However, finalising end to end solution designs, agreeing detailed dependencies and finalising commercial agreements has been challenging and continues to prove so. Delays achieving alignment in these areas and in contract signature for NS&Is new Banking Engine have impacted transition delivery milestones. Atos' market position has deteriorated and continues to be monitored carefully. A recovery route on an Integrated Delivery approach and plan continues to be the Programme's focus, working collaboratively with all strategic partners and with technical, legal and commercial experts.","startDate":"2019-06-03","endDate":"2026-03-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 increased from 2025-07-31 to 2026-03-31. This is primarily due to the following factors. The Programme continues to work in collaboration with all NS&I's strategic partners and experts engaged in the programme to develop the technical and commercial solutions required to achieve transition of services and programme completion by current programme end-date. However, initial contract delivery milestones have not all been met owing to the complex challenges experienced in finalising detailed solution designs, plans and commercials, and the Programme does not yet have an integrated plan with dependencies agreed by all partners that demonstrates its ability to deliver by this end date. The concerted effort to achieve this is the programme's priority, in which key resources continue to be engaged.","fyBaseline":109.52,"fyForecast":89.68,"fyVariance":-18.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The GMPP project did not provide narrative","wholeLifeCost":1864.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 increased from 1158m. to 1864m. This is primarily due to the following factors. NS&I received approval for the Rainbow Programme Full Business Case (FBC) in September 2023. This follows approval of the Outline Business Case in March 2021, and approval of the Strategic Outline Business Case in June 2020. The baseline costs in the GMPP quarterly submission reflect the financial analysis in the FBC which covers the period from 2021-22 through to 2030-31. Costs incurred prior to April 2021 were part of a discovery exercise and were not specifically attributed to this project. The costs shown here cover activities including running the procurements, building the solutions, transforming the business, and the future ongoing running costs.","benefits":488.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 2324-Q4 decreased from 590m. to 488m. Full monetised benefits are only forecast to start from 2026-27 after the organisational transformation has completed.","themes":["Commercial & supply chain","Cost & funding","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Red. This is primarily due to the following factors. Since the last annual update, the Programme has awarded further procurement packages and signed contracts for B2B Transition, Contact Centre and Operations (awarded to…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"HMT_0004_2021-Q2","year":2025,"name":"NS&I Transformation","department":"HMT","category":"Government Transformation and Service Delivery","description":"The NS&I Business Transformation Programme will undertake a re-procurement of services and implementation of a new business delivery model with three aims: • To measurably reduce the costs of running the Retail business in steady state, • To complete NS&I’s journey to becoming a self-service digital business with support for the vulnerable and excluded, • To deliver more nimbly, reducing risk and enhancing scalability.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at RED. This is primarily due to the following factors‚ Solution gaps and other serious risks to the Business Transformation Programme have necessitated a recovery plan. There is a risk of slippage on major roadmap deliverables caused by scope and timeline mismatches between supplier contracts and the programme roadmap, alongside solution and design gaps necessitating re-work. In January 2025 the IPA conducted an Assurance of Action Plan that rated the programme’s recovery plan as AMBER, giving confidence that once the recovery plan is executed, the programme will return to Amber status.","startDate":"2019-06-03","endDate":"2028-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2026 to 31/03/2028. This is primarily due to the following factors‚ Commercial issues persisted with delays to contract signature for NS&I’s core banking engine and with the delivery of NS&I’s new Business-to-Business capability. Their combined impact was to extend the outsourcing agreement with the existing supplier by 2 years to March 28. Programme recovery was also a factor, with the core element being a significant shift in delivery approach for the remaining milestones.","fyBaseline":342.8,"fyForecast":329.9,"fyVariance":3.76,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":2955.6,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased to 2955. This is primarily due to the following factors‚ The updated Full Business Case (FBC) was approved by Ministers and HM Treasury in Dec. 2024. This showed a cost increase over the previous 2023 Business Case in part due to inflation effects on rephased costs, increased solution complexity and increased incumbent and head office costs, as the transitional period for the programme was extended. Additional risk-based costs were also included to reflect solution uncertainty during the recovery period.","benefits":971.3,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 488 to 971. This is primarily due to the following factors‚ The updated Full Business Case (FBC) was approved by Ministers and HM Treasury at the end of 2024. This FBC is reporting benefits up to 2033-34, as compared to the previous FBC which reported benefits up to 2030-31.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at RED. This is primarily due to the following factors‚ Solution gaps and other serious risks to the Business Transformation Programme have necessitated a recovery plan. There is a risk of slippage on major roadmap…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"HMT_0004_2021-Q2","year":2026,"name":"NS&I Transformation","department":"HMT","category":"Government Transformation and Service Delivery","description":"The Business Transformation Programme (BTP) exists to modernise NS&I’s technology, operating model and supplier arrangements so that the organisation can continue to deliver safe, secure and reliable savings products while providing long‑term value for money to the taxpayer. The programme is designed to replace ageing, expensive, inflexible legacy systems and move NS&I towards a more cost-effective, resilient, scalable and digital‑first service, enabling it to respond effectively to changing customer needs, Government policy requirements and market conditions. In doing so, the programme aims to: - Reduce the long‑term cost of running the business, including Business‑as‑Usual operations and future change delivery - Improve customer experience and accessibility, supporting digital self‑service while ensuring provision for vulnerable or excluded customers - Increase operational resilience and security, including improved cyber security and continuity of service through transition and beyond - Strengthen NS&I’s agility and change capability, allowing faster, lower‑risk delivery of new products and policy‑driven change for HM Treasury Overall, the Business Transformation Programme underpins NS&I’s ambition to become the UK’s most trusted savings provider, with a sustainable delivery model that supports public services over the long term and aligns with Government Major Projects Portfolio (GMPP) expectations for value, resilience and capability.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Delivery confidence is assessed as RED because the programme cannot currently be delivered to agreed cost, schedule and scope without significant re‑planning and re‑baselining. There is no agreed, affordable end‑to‑end delivery plan, with delivery outcomes dependent on the resolution of active options analysis and future funding decisions. Confidence is further constrained by Spending Review affordability pressures, ongoing uncertainty around scope and sequencing, and the absence of a finalised, quantified benefits baseline. Until these issues are resolved and a preferred option is approved, delivery commitments cannot be made with confidence. Senior‑level intervention and agreement with HM Treasury are required to restore a credible baseline and improve delivery confidence.","startDate":"2019-06-03","endDate":null,"scheduleNarrative":"Exempt under Section 43 - Commercial interests","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Exempt under Section 43 - Commercial interests","themes":["Delivery & schedule","Commercial & supply chain","Cost & funding","Scope & requirements"],"evidenceExcerpt":"Delivery confidence is assessed as RED because the programme cannot currently be delivered to agreed cost, schedule and scope without significant re‑planning and re‑baselining. There is no agreed, affordable end‑to‑end delivery plan, with delivery outcomes dependent on the resolution of active options analysis and future funding decisions. Confidence is…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"HMT_0004_2021-Q2","year":2025,"name":"NS&I Transformation","department":"HMT","category":"Government Transformation and Service Delivery","description":"The NS&I Business Transformation Programme will undertake a re-procurement of services and implementation of a new business delivery model with three aims: • To measurably reduce the costs of running the Retail business in steady state, • To complete NS&I’s journey to becoming a self-service digital business with support for the vulnerable and excluded, • To deliver more nimbly, reducing risk and enhancing scalability.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at RED. This is primarily due to the following factors‚ Solution gaps and other serious risks to the Business Transformation Programme have necessitated a recovery plan. There is a risk of slippage on major roadmap deliverables caused by scope and timeline mismatches between supplier contracts and the programme roadmap, alongside solution and design gaps necessitating re-work. In January 2025 the IPA conducted an Assurance of Action Plan that rated the programme’s recovery plan as AMBER, giving confidence that once the recovery plan is executed, the programme will return to Amber status.","startDate":"2019-06-03","endDate":"2028-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2026 to 31/03/2028. This is primarily due to the following factors‚ Commercial issues persisted with delays to contract signature for NS&I’s core banking engine and with the delivery of NS&I’s new Business-to-Business capability. Their combined impact was to extend the outsourcing agreement with the existing supplier by 2 years to March 28. Programme recovery was also a factor, with the core element being a significant shift in delivery approach for the remaining milestones.","fyBaseline":342.8,"fyForecast":329.9,"fyVariance":3.76,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":2955.6,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased to 2955. This is primarily due to the following factors‚ The updated Full Business Case (FBC) was approved by Ministers and HM Treasury in Dec. 2024. This showed a cost increase over the previous 2023 Business Case in part due to inflation effects on rephased costs, increased solution complexity and increased incumbent and head office costs, as the transitional period for the programme was extended. Additional risk-based costs were also included to reflect solution uncertainty during the recovery period.","benefits":971.3,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 488 to 971. This is primarily due to the following factors‚ The updated Full Business Case (FBC) was approved by Ministers and HM Treasury at the end of 2024. This FBC is reporting benefits up to 2033-34, as compared to the previous FBC which reported benefits up to 2030-31.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at RED. This is primarily due to the following factors‚ Solution gaps and other serious risks to the Business Transformation Programme have necessitated a recovery plan. There is a risk of slippage on major roadmap…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":null,"attentionScore":49,"attentionReasons":["Current published delivery confidence is Red","In-year forecast variance is +43.0%"]},{"id":"MOD_0100_1516-Q1","year":2026,"name":"SKYNET 6 (AKA FBLOS)","department":"MOD","category":"Information and Communications Technology (ICT)","description":"Skynet 6 was established to replace the satellite communication services provided by the SKYNET 5 Public Finance Initiative with Airbus Defence and Space. When introduced it will provide continued satellite communications to 2042.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Red. This is primarily due to the following factors.. 1. Significant disparity between the programme’s scope and financial provision remains and cannot be aligned until the outcome of the Defence Investment Plan is known. 2. Resourcing constraints continue to impact delivery at programme level. Sub-par supplier performance continues to delay delivery of the first SKYNET 6 satellite.","startDate":"2011-01-01","endDate":"2041-12-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 31/12/2041.","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmental-agree monetised benefits at 25/26-Q4 remained at 0m.","themes":["Delivery & schedule","Commercial & supply chain","Cost & funding","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Red. This is primarily due to the following factors.. 1. Significant disparity between the programme’s scope and financial provision remains and cannot be aligned until the outcome of the Defence Investment Plan is known. 2. Resourcing…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"MOD_0100_1516-Q1","year":2020,"name":"Future Beyond Line Of Sight","department":"MOD","category":"ICT","description":"Replaces the existing UK sovereign SKYNET 5 secure space-based satellite communications capability.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber/Red, which has not changed since last year�s Q2 1819 Amber/Red, due primarily to the following factors; - Delivery confidence remains unchanged however the underlying reasons are different from the previous years assessment. FY 19/20 saw several sequential approvals submitted through Defence and Other Government Departments (OGDs) as well as contracting for a new Client Side Support provider which created uncertainty within the programme. All are now complete so an improved rating is anticipated Since the Q2 1920 (30th September 2019) Amber/Red IPA DCA, the following non-project operating environment activities have impacted the original Q2 IPA DCA; - The 2019 General Election and HMT single year approvals drove delay into the investment approvals process. The programme continues to search for ways in which this lost time can be regained and has developed deeper professional relationships with OGDs to better manage this in future. - COVID-19 has impacted on the programme, predominately in the SKYNET 6 Service Delivery Wrap competition. Full COVID-19 consequences have not yet materialised, so it is not yet possible to determine the longer term programmatic impact. Since the Q2 1920 (30th September 2019) Amber/Red IPA DCA, the following primary project actions have impacted the original Q2 IPA DCA; - New Client Side Support partner effectively onboarded and providing significant support to programme, that improved many aspects previous reported as needing attention by IPA and DMPP reviews. All projected approvals have been completed. - New SRO, dedicating 50% of their time to FBLOS-SKYNET 6 was onboarded in Nov 19, a 1-year extension of the additional Programme Director to Oct 20 and completion of the recruitment into the Programme Management Office have all improved the management and governance of the programme.","startDate":"2011-01-01","endDate":"2041-12-31","scheduleNarrative":"The scheduled baseline project end date at Q2 1920 (30th September 2019) is 31/12/41, has not changed since last year's Q2 1819 date of 31/12/41, due primarily to the following factors; - The FBLOS capability planning assumption is a 15-year spacecraft life commencing 2027. This programme is analysing technological options and can only reassess the programme end date once this part of the programme (Enduring Capability project) reaches predicted Full Business Case in late 2021. - The end date is too far in the future and it is too early in the programme to accurately calculate any changes given the speed at which Space Technology is changing. It is not currently forecast that there is any circumstance that would need that date to be changed. Since the Q2 1920 (30th September 2019) baseline project end date of 31/12/41, the following non-project operating environment activities have impacted the original Q2 baseline project end date; - There are no known non-project operating environment activities that are expected to affect the 31/12/2041 date; it is too far in the future to predict and impact of any activity since Q2 19/20. Since the Q2 1920 (30th September 2019) baseline project end date of 31/12/41, the following primary project actions have impacted the original Q2 baseline project end date; - There are no known primary project actions that would affect the projects end date of 31/12/2041. The SKYNET 6 Enduring Capability project is still in assessment Phase and will not fully conclude until late 2021, when it is expected to down select the choices/options and make recommendations. - The provision of the SKYNET 6 Enduring Capability project Full Business Case in late 2021 is the first point at which any credible impact to the project end date of 31/12/2041 can credibly be assessed.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests)","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests)","benefits":null,"benefitsNarrative":"","themes":["Delivery & schedule","Workforce & capability","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber/Red, which has not changed since last year�s Q2 1819 Amber/Red, due primarily to the following factors; - Delivery confidence remains unchanged however the underlying reasons are different from the previous years assessment. FY 19/20 saw several sequential…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2020","sourceLabel":"IPA Annual Report 2019-20"},{"id":"MOD_0100_1516-Q1","year":2021,"name":"Future Beyond Line Of Sight","department":"MOD","category":"ICT","description":"Replaces the existing UK sovereign SKYNET 5 secure space-based satellite communications capability.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber/red. This is primarily due to the following factors: Since the last report at 30 September 2021, the operating environment has been impacted by Covid-19 with associated delay experienced on the Assessment Phase of the Service Delivery Wrap and additional risk to the Concept Phase of the Enduring Capability project. Mitigation measures have been set in place for the delay to Service Delivery Wrap, which will ensure continuity of service delivery at the end of the SKYNET 5 Private Finance Initiative contract in August 22.�","startDate":"2011-01-01","endDate":"2041-12-31","scheduleNarrative":"Compared to financial year 19/20-Q2, the project's end-date remained scheduled to finish on 31 December 2041 . This is primarily due to the following factors:","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"","themes":["Delivery & schedule","Commercial & supply chain","Cost & funding","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber/red. This is primarily due to the following factors: Since the last report at 30 September 2021, the operating environment has been impacted by Covid-19 with associated delay experienced on the Assessment Phase of the Service…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21"},{"id":"MOD_0100_1516-Q1","year":2022,"name":"Future Beyond Line Of Sight","department":"MOD","category":"ICT","description":"Under the Future Beyond Line Of Sight - SKYNET 6 programme the MOD will deliver and manage military Core Satellite Communications (SATCOM) services from September 22. This will include a new Service Delivery contract to take on existing core services and procurement of the next generation of space-based SATCOM capability.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating increased from Amber/Red to Amber. This is primarily due to the following factors: The removal of the incremental Amber/Red and Amber/Green assessment ratings. The programme's first delivery and new arrangements to replace the SKYNET 5 PFI contracted service are expected to be successfully achieved in August 2022. However, there is increased risk to the schedule for the delivery of the later satellites that are under active mitigation measures. There are significant shortages of skilled people in this sector with Defence needing to become more competitive to secure such resource.","startDate":"2011-01-01","endDate":"2041-12-31","scheduleNarrative":"Compared to 2021-Q4 the project end-date remained scheduled to finish on 31 December 41.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests)","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests)","benefits":null,"benefitsNarrative":"","themes":["Delivery & schedule","Commercial & supply chain","Cost & funding","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating increased from Amber/Red to Amber. This is primarily due to the following factors: The removal of the incremental Amber/Red and Amber/Green assessment ratings. The programme's first delivery and new arrangements to replace the SKYNET 5 PFI…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"MOD_0100_1516-Q1","year":2023,"name":"Skynet 6 (aka FBLOS)","department":"MOD","category":"ICT","description":"SKYNET 6 programme the MOD will deliver and manage military Core Satellite Communications (SATCOM) services from September 22. This will include a new Service Delivery contract to take on existing core services and procurement of the next generation of space-based SATCOM capability.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. The 6A satellite project remains on track to deliver in 2025 with 4-months schedule contingency. There remains, however, significant risk attached to a programme with this level of complexity and challenge.","startDate":"2011-01-01","endDate":"2041-12-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2041-12-31. This is primarily due to the following factors. NA","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This programme does not report cashable benefits. Its aim is to provision the armed forces with the equipment and / or infrastructure required.","themes":["Commercial & supply chain","Delivery & schedule","Cost & funding"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. The 6A satellite project remains on track to deliver in 2025 with 4-months schedule contingency. There remains, however, significant risk attached to a programme with…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"MOD_0100_1516-Q1","year":2024,"name":"Skynet 6 (aka FBLOS)","department":"MOD","category":"ICT","description":"SKYNET has provided Satellite Communications to Defence and other Government Departments since the 1960s. The SKYNET 6 Programme will provide a continuity of services to all military satellite requirements. This includes a new Service Delivery contract to take on existing core services and procurement of the next generation of space-based SATCOM capability.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 has remained at Amber. This is primarily due to the following factors. Transition to a new Skynet Service Continuity Contract was successfully completed in February 2024. However, supply chain issues will delay Satellite delivery. The Programme continues to be impacted by people resource shortfalls exacerbated by civil service recruitment restrictions imposed in 2023.","startDate":"2011-01-01","endDate":"2041-12-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained scheduled to finish on 2041-12-31.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":0.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 0m.","themes":["Commercial & supply chain","Delivery & schedule","Cost & funding","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 has remained at Amber. This is primarily due to the following factors. Transition to a new Skynet Service Continuity Contract was successfully completed in February 2024. However, supply chain issues will delay Satellite delivery. The…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"MOD_0100_1516-Q1","year":2025,"name":"SKYNET 6 (AKA FBLOS)","department":"MoD","category":"Military Capability","description":"SKYNET 6 delivered by Defence Digital in conjunction with UK Space Command will provide the next generation of space-based SATCOM capability by replacing current services currently provided by the SKYNET 5 Public Finance Initiative out to 2042.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is RED, compared with the project's assessment last year of AMBER. This is due to the following factors. Departmental wide resourcing and recruitment constraints have led to workforce shortages. Coupled with sub-par supplier performance has delayed delivery of the first SKYNET 6 satellite.","startDate":"2011-01-01","endDate":"2041-12-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/12/2041. This is primarily due to the following factors.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 43 - Commercial interests","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0.","themes":["Commercial & supply chain","Delivery & schedule","Workforce & capability","Cost & funding"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is RED, compared with the project's assessment last year of AMBER. This is due to the following factors. Departmental wide resourcing and recruitment constraints have led to workforce shortages. Coupled with sub-par supplier performance has delayed delivery of the first…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"MOD_0100_1516-Q1","year":2026,"name":"SKYNET 6 (AKA FBLOS)","department":"MOD","category":"Information and Communications Technology (ICT)","description":"Skynet 6 was established to replace the satellite communication services provided by the SKYNET 5 Public Finance Initiative with Airbus Defence and Space. When introduced it will provide continued satellite communications to 2042.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Red. This is primarily due to the following factors.. 1. Significant disparity between the programme’s scope and financial provision remains and cannot be aligned until the outcome of the Defence Investment Plan is known. 2. Resourcing constraints continue to impact delivery at programme level. Sub-par supplier performance continues to delay delivery of the first SKYNET 6 satellite.","startDate":"2011-01-01","endDate":"2041-12-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 31/12/2041.","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmental-agree monetised benefits at 25/26-Q4 remained at 0m.","themes":["Delivery & schedule","Commercial & supply chain","Cost & funding","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Red. This is primarily due to the following factors.. 1. Significant disparity between the programme’s scope and financial provision remains and cannot be aligned until the outcome of the Defence Investment Plan is known. 2. Resourcing…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"MOD_0100_1516-Q1","year":2025,"name":"SKYNET 6 (AKA FBLOS)","department":"MoD","category":"Military Capability","description":"SKYNET 6 delivered by Defence Digital in conjunction with UK Space Command will provide the next generation of space-based SATCOM capability by replacing current services currently provided by the SKYNET 5 Public Finance Initiative out to 2042.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is RED, compared with the project's assessment last year of AMBER. This is due to the following factors. Departmental wide resourcing and recruitment constraints have led to workforce shortages. Coupled with sub-par supplier performance has delayed delivery of the first SKYNET 6 satellite.","startDate":"2011-01-01","endDate":"2041-12-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/12/2041. This is primarily due to the following factors.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 43 - Commercial interests","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0.","themes":["Commercial & supply chain","Delivery & schedule","Workforce & capability","Cost & funding"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is RED, compared with the project's assessment last year of AMBER. This is due to the following factors. Departmental wide resourcing and recruitment constraints have led to workforce shortages. Coupled with sub-par supplier performance has delayed delivery of the first…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":0,"attentionScore":49,"attentionReasons":["Current published delivery confidence is Red","In-year forecast variance is +43.0%"]},{"id":"MOD_0140_2122-Q1","year":2026,"name":"SPEARCAP 3","department":"MOD","category":"Military Capability","description":"This programme aims to achieve delivery and integration of Spear Cap 3, which will deliver the principal air-to-ground weapon for UK F-35 and is critical to the aircraft's Attack and Control of the Air capabilities in contested environments.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Red. This is primarily due to the following factors. 1. Owing to compounded delays and the requirement to fully re-baseline the programme. 2. Dependencies on the reprofiled F-35B integration timeline, along with ongoing challenges in equipment programme maturity and resourcing remain key factors. 3. A Review Note detailing the re-baseline requirements, when approved, will give rise to a more definitive delivery confidence assessment.","startDate":"2020-09-30","endDate":"2047-12-31","scheduleNarrative":"Exempt under Section 27 - International relations","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Compared to financial year 2024/25-Q4, the project's departmental-agreed monetised benefits at 2025/26-Q4 remained at £0m.","themes":["Scope & requirements","Commercial & supply chain","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Red. This is primarily due to the following factors. 1. Owing to compounded delays and the requirement to fully re-baseline the programme. 2. Dependencies on the reprofiled F-35B integration timeline, along with ongoing challenges in…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"MOD_0140_2122-Q1","year":2022,"name":"Spearcap 3","department":"MOD","category":"Military Capability","description":"Spear Cap 3 will deliver the principal air-to-air ground weapon for UK F-35 and is critical to the aircraft's Attack and Control of the Air capabilities in contested environments.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Spear Cap 3 Programme was previously contained within the Complex Weapons Portfolio and has been extracted to allow for better targeted approval and assurance processes. As such it is not possible to comment on its Delivery Confidence in March 21. However, it is currently assessed as Amber by the Senior Responsible Owner.","startDate":"2020-09-30","endDate":"2027-06-30","scheduleNarrative":"The Spear Cap 3 Programme was previously contained within the Complex Weapons Portfolio and has been extracted to allow for better targeted approval and assurance processes. As such there is no baseline date recorded for March 21 for comparison. However, closure is currently forecast to be December 47","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests)","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests)","benefits":null,"benefitsNarrative":"","themes":["Approvals & decisions","Commercial & supply chain","Governance & assurance","Delivery & schedule"],"evidenceExcerpt":"The Spear Cap 3 Programme was previously contained within the Complex Weapons Portfolio and has been extracted to allow for better targeted approval and assurance processes. As such it is not possible to comment on its Delivery Confidence in March 21. However, it is currently assessed as Amber by the Senior Responsible Owner. The Spear Cap 3 Programme was…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"MOD_0140_2122-Q1","year":2023,"name":"Spearcap 3","department":"MOD","category":"Military Capability","description":"Spear Cap 3 will deliver the principal air-to-airground weapon for UK F-35 and is critical to the aircraft's Attack and Control of the Air capabilities in contested environments.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 decreased from Amber (IPA rating) to Red (SRO rating). This is primarily due to the following factors. There are challenges with resourcing sufficient suitably qualified and experienced people across the programme and delivery teams, and within industry. A series of deep-dives, along with a monthly Programme Board with the new Senior Responsible Owner have been put in place to address these challenges. Programme Governance and the availability Management Information is also being refreshed alongside a plan to improve Programme performance. Opportunities are being identified to bring schedule back within the approved timeline. The programme is also exploring opportunities to spiral capability developments to ensure capability is delivered at the earliest opportunity.","startDate":"2020-09-30","endDate":"2047-12-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 increased from 2027-06-30 to 2047-12-31. This is primarily due to the following factors. Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This programme does not report cashable benefits. Its aim is to provision the armed forces with the equipment and / or infrastructure required.","themes":["Commercial & supply chain","Delivery & schedule","Governance & assurance","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 decreased from Amber (IPA rating) to Red (SRO rating). This is primarily due to the following factors. There are challenges with resourcing sufficient suitably qualified and experienced people across the programme and delivery teams, and within industry. A series of…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"MOD_0140_2122-Q1","year":2024,"name":"Spearcap 3","department":"MOD","category":"Military Capability","description":"This programme aims to achieve delivery and integration of Spear Cap 3; which will deliver the principal air-to-ground weapon for UK F-35 and is critical to the aircraft's Attack and Control of the Air capabilities in contested environments.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure and Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Red. This is primarily due to the following factors. Compounded delays and issues have led to a requirement to re-baseline the programme. There are challenges with resourcing sufficient suitably qualified and experienced people across defence, the programme and delivery teams; and within industry. Programme governance and the availability management information is also being refreshed alongside a plan to improve Programme performance. Opportunities to spiral capability developments to ensure capability is delivered at the earliest opportunity are being considered by the SRO.","startDate":"2020-09-30","endDate":"2030-12-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 decreased from 2047-12-31 to 2030-12-31. This is primarily due to the following factors. The previous programme end date provided was the Out of Service date, but now reflects the date at which the capability has been delivered and the programme team will no longer be required. The programme is currently undergoing a rebaselining which may further affect the programme end date.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":0.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 0m.","themes":["Commercial & supply chain","Workforce & capability","Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure and Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Red. This is primarily due to the following factors. Compounded delays and issues have led to a requirement to re-baseline the programme. There are challenges with resourcing sufficient suitably qualified and…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"MOD_0140_2122-Q1","year":2025,"name":"SPEARCAP 3","department":"MoD","category":"Military Capability","description":"This programme aims to achieve delivery and integration of Spear Cap 3, which will deliver the principal air-to-ground weapon for UK F-35 and is critical to the aircraft's Attack and Control of the Air capabilities in contested environments.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to the financial year 23/24 Q4, the NISTA Delivery confidence Assessment rating remained at Red. This is primarily due to the following factors: The integration of the missile onto F35B is almost exclusively dependent on the schedule of the aircraft production and subsequent delivery into service. As the integration timeline is currently uncertain it is prudent to reflect this in continued Reduced delivery confidence. However, there was a successful guided firing trial of the missile in November 2024","startDate":"2020-09-30","endDate":"2056-09-20","scheduleNarrative":"Section 27 - International relations","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 43 - Commercial interests","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":0.0,"benefitsNarrative":"Compared to financial year 2023/24-Q4, the project's departmental-agreed monetised benefits at 2024/25-Q4 remained at £0m. No monetised benefits","themes":["Delivery & schedule","Commercial & supply chain","Technical & integration","Cost & funding"],"evidenceExcerpt":"Compared to the financial year 23/24 Q4, the NISTA Delivery confidence Assessment rating remained at Red. This is primarily due to the following factors: The integration of the missile onto F35B is almost exclusively dependent on the schedule of the aircraft production and subsequent delivery into service. As the integration timeline is currently uncertain…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"MOD_0140_2122-Q1","year":2026,"name":"SPEARCAP 3","department":"MOD","category":"Military Capability","description":"This programme aims to achieve delivery and integration of Spear Cap 3, which will deliver the principal air-to-ground weapon for UK F-35 and is critical to the aircraft's Attack and Control of the Air capabilities in contested environments.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Red. This is primarily due to the following factors. 1. Owing to compounded delays and the requirement to fully re-baseline the programme. 2. Dependencies on the reprofiled F-35B integration timeline, along with ongoing challenges in equipment programme maturity and resourcing remain key factors. 3. A Review Note detailing the re-baseline requirements, when approved, will give rise to a more definitive delivery confidence assessment.","startDate":"2020-09-30","endDate":"2047-12-31","scheduleNarrative":"Exempt under Section 27 - International relations","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Compared to financial year 2024/25-Q4, the project's departmental-agreed monetised benefits at 2025/26-Q4 remained at £0m.","themes":["Scope & requirements","Commercial & supply chain","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Red. This is primarily due to the following factors. 1. Owing to compounded delays and the requirement to fully re-baseline the programme. 2. Dependencies on the reprofiled F-35B integration timeline, along with ongoing challenges in…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"MOD_0140_2122-Q1","year":2025,"name":"SPEARCAP 3","department":"MoD","category":"Military Capability","description":"This programme aims to achieve delivery and integration of Spear Cap 3, which will deliver the principal air-to-ground weapon for UK F-35 and is critical to the aircraft's Attack and Control of the Air capabilities in contested environments.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to the financial year 23/24 Q4, the NISTA Delivery confidence Assessment rating remained at Red. This is primarily due to the following factors: The integration of the missile onto F35B is almost exclusively dependent on the schedule of the aircraft production and subsequent delivery into service. As the integration timeline is currently uncertain it is prudent to reflect this in continued Reduced delivery confidence. However, there was a successful guided firing trial of the missile in November 2024","startDate":"2020-09-30","endDate":"2056-09-20","scheduleNarrative":"Section 27 - International relations","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 43 - Commercial interests","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":0.0,"benefitsNarrative":"Compared to financial year 2023/24-Q4, the project's departmental-agreed monetised benefits at 2024/25-Q4 remained at £0m. No monetised benefits","themes":["Delivery & schedule","Commercial & supply chain","Technical & integration","Cost & funding"],"evidenceExcerpt":"Compared to the financial year 23/24 Q4, the NISTA Delivery confidence Assessment rating remained at Red. This is primarily due to the following factors: The integration of the missile onto F35B is almost exclusively dependent on the schedule of the aircraft production and subsequent delivery into service. As the integration timeline is currently uncertain…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":-3186,"attentionScore":49,"attentionReasons":["Current published delivery confidence is Red","In-year forecast variance is +43.0%"]},{"id":"MOD_0112_1718-Q1","year":2026,"name":"TYPE 31","department":"MOD","category":"Military Capability","description":"The Type 31 general purpose frigate programme is designed to deliver a general purpose frigate capability and act as the pathfinder programme for the Government’s National Shipbuilding Strategy. T31 will be at the heart of the Royal Navy’s surface fleet, deterring aggression and maintaining the security of the UK’s interests. They will work alongside our Allies to deliver a credible UK warship presence across the globe. Flexible and adaptable by design, T31 frigates will undertake missions such as interception and disruption of those using the sea for unlawful purposes, collecting intelligence, conducting defence engagement, and assisting those in need.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Red. This is primarily due to the following factors‚ 1. Successful delivery to meet the User Requirements remains on track, but the impact of inflation will require a reset of the programme’s Approved Budgetary Limit following announcement of the Defence Investment Plan. 2. Challenges also remain in the first of class schedule against an ambitious build timeline, and the complex integration challenges.","startDate":"2016-04-01","endDate":"2033-07-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme end-date at 25/26-Q4 remained the same at 31/05/2030.","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Commercial & supply chain","Delivery & schedule","Cost & funding","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Red. This is primarily due to the following factors‚ 1. Successful delivery to meet the User Requirements remains on track, but the impact of inflation will require a reset of the programme’s Approved Budgetary Limit following announcement…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"MOD_0112_1718-Q1","year":2020,"name":"Type 31e","department":"MOD","category":"Military Capability","description":"Aims to deliver a pipeline of credible, affordable and exportable warships enabling Defence to increase its global footprint.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber, due primarily to the following factors; - In order to achieve contract award by mid-November, as challenged by the Prime Minister, cross-Government investment approvals were required by no later than 31 Oct 19. A recent Project Assessment Review (PAR) was conducted in September 19 concluded that a Delivery Confidence Assessment of Amber was considered appropriate. The review team assessed that programme success was achievable, but that two necessary actions must be implemented as soon as practicable. The first action was to resolve the programme's affordability challenge, requiring the Department to prioritise the project within the wider Defence portfolio. The second action was to ensure that full cross-Government approvals were achieved before the fixed price contract offer expiry date of 31 Dec 19. Since the Q2 1920 (30th September 2019) Amber IPA DCA, the following primary project actions have impacted the original Q2 IPA DCA; - Cross-Government investment approvals were achieved by the end of Oct 19, permitting award of the T31 Design & Build contract in Nov 19.","startDate":"2016-04-01","endDate":"2030-02-28","scheduleNarrative":"The scheduled project end date at Q2 1920 (30th September 2019) is 28/02/30, due primarily to the following factors; - Project closure is baseline for 2030, it is too early to predict any change to the forecast. - The baseline date is based upon the delivery date of the final ship, with an additional programme of work post-delivery to account for acceptance, safety, sea trials and training activities.","fyBaseline":13.24,"fyForecast":12.76,"fyVariance":-4.0,"varianceNarrative":"Budget variance less than 5%","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests)","benefits":null,"benefitsNarrative":"","themes":["Commercial & supply chain","Delivery & schedule","Governance & assurance","Cost & funding"],"evidenceExcerpt":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber, due primarily to the following factors; - In order to achieve contract award by mid-November, as challenged by the Prime Minister, cross-Government investment approvals were required by no later than 31 Oct 19. A recent Project Assessment Review (PAR) was…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2020","sourceLabel":"IPA Annual Report 2019-20"},{"id":"MOD_0112_1718-Q1","year":2021,"name":"Type 31","department":"MOD","category":"Military Capability","description":"The T31 programme is designed to deliver a general-purpose frigate capability and act as the pathfinder programme for the National Shipbuilding Strategy. From the mid-2020s, T31 will be at the heart of the Royal Navy's surface fleet, deterring aggression and maintaining the security of the UK's interests. They will work alongside our Allies to deliver credible UK warship presence across the globe. Flexible and adaptable by design, T31 frigates will undertake missions such as interception and disruption of those using the sea for unlawful purposes, collecting intelligence, conducting defence engagement and assisting those in need.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber. This is primarily due to the following factors: Reinforced by recent Infrastructure and Projects Authority Gateway 0 Review, Delivery Confidence of Amber is still considered appropriate given the COVID-19 pandemic and the likely impacts on the design work and�supply chain. During the final quarter of financial year 20/21, the shipbuilder made�good progress on the design and engineering work, successfully passing the independently-chaired Whole Ship Critical Design Review in February 2021. Similarly, the pace of construction of the new infrastructure upgrades has been maintained. In addition the significant achievement in the award of a key Ministry Of Defence contract to MBDA for provision of the Sea Ceptor missile system which will be the Type 31's primary air defence weapon system has been realised. This contract will ensure that MBDA, Babcock and Thales as the Combat System lead can integrate this significant capability into the Type 31. The most significant risk to the programme at this stage remains the Ministry Of Defences' and Contractors' ability to deliver information, equipment and services from the entire supply chain for the ship design, integration and build.","startDate":"2016-04-01","endDate":"2030-05-31","scheduleNarrative":"Compared to financial year 19/20-Q2, the project's end-date increased from 31 March 2029 to 31 May 2030 . This is primarily due to the following factors: This is because in the last reporting year the project was pre-contract and the end date was therefore based on a historic planning assumption in FY19/20. The end date now reflects the contractual obligation for the fifth ship to be delivered by end 2028 plus the requirement for the Royal Navy to deliver the full suite of crew training and capability integration post-contract. The schedule was produced under competitive tension, which is the basis of the value for money assessment and approval of the final business case.","fyBaseline":192.5,"fyForecast":177.86,"fyVariance":-8.0,"varianceNarrative":"The budget variance exceeds 5%. An 8% variance is recorded against Financial Year 20/21 as a result of paying a contract milestone payment 1 month early, bringing it forward from FY20/21 into 19/20.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"","themes":["Commercial & supply chain","Delivery & schedule","Cost & funding","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber. This is primarily due to the following factors: Reinforced by recent Infrastructure and Projects Authority Gateway 0 Review, Delivery Confidence of Amber is still considered appropriate given the COVID-19 pandemic and the…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21"},{"id":"MOD_0112_1718-Q1","year":2022,"name":"Type 31e","department":"MOD","category":"Military Capability","description":"The Type 31 general purpose frigate programme is designed to deliver a general-purpose frigate capability and act as the pathfinder programme for the National Shipbuilding Strategy. From the mid-2020s, Type 31 will be at the heart of the Royal Navy's surface fleet, deterring aggression and maintaining the security of the UK's interests. They will work alongside our Allies to deliver a credible UK warship presence across the globe. Flexible and adaptable by design, Type 31 frigates will undertake missions such as interception and disruption of those using the sea for unlawful purposes, collecting intelligence, conducting defence engagement and assisting those in need.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber. This is primarily due to the following factors: Successful delivery appears feasible but significant issues already exist, requiring sustained management attention and mitigation, which are in place for these issues. Amber is considered appropriate, given the COVID-19 pandemic impacts on the programme and the complex activities associated with delivering the full capability of a \"new to service\" combat system and its associated systems.","startDate":"2016-04-01","endDate":"2029-03-31","scheduleNarrative":"Compared to 2021-Q4 the project end-date decreased from 31 May 2030 to 31 March 2029. This is primarily due to the following factors: The ship builder maintained the baseline schedule agreed during the start of the contract and despite pandemic challenges, last year they managed to achieve all contractual milestones. The schedule is taut and exposed to risk from complex mission systems integration and Global economic and supply chain challenges that require continued management.","fyBaseline":241.28,"fyForecast":242.19,"fyVariance":0.0,"varianceNarrative":"The budget variance is inferior or equal to 5%.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests)","benefits":null,"benefitsNarrative":"","themes":["Delivery & schedule","Commercial & supply chain","Cost & funding","Technical & integration"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber. This is primarily due to the following factors: Successful delivery appears feasible but significant issues already exist, requiring sustained management attention and mitigation, which are in place for these issues. Amber is…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"MOD_0112_1718-Q1","year":2023,"name":"Type 31e","department":"MOD","category":"Military Capability","description":"The Type 31 general purpose frigate programme is designed to deliver a general-purpose frigate capability and act as the pathfinder programme for the National Shipbuilding Strategy. From the mid-2020s, Type 31 will be at the heart of the Royal Navy's surface fleet, deterring aggression and maintaining the security of the UK's interests. They will work alongside our Allies to deliver a credible UK warship presence across the globe. Flexible and adaptable by design, Type 31 frigates will undertake missions such as interception and disruption of those using the sea for unlawful purposes, collecting intelligence, conducting defence engagement and assisting those in need.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber (SRO rating). This is primarily due to the following factors. Successful delivery appears feasible but significant issues already exist requiring sustained management attention and mitigation, which are in place for these issues. Amber is considered appropriate given the COVID-19 pandemic impacts on the programme, supply chain issues as a result of the conflict in Ukraine, and the complex activities associated with delivering the full capability of a `new to service` combat system and its associated systems. In addition to this, inflation uncertainty, supply chain impacts as a result of Global events, and Royal Navy personnel challenges in areas of key engineering skills remain significant risks for the programme.","startDate":"2016-04-01","endDate":"2029-03-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2029-03-31. This is primarily due to the following factors. NA","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This programme does not report cashable benefits. Its aim is to provision the armed forces with the equipment and / or infrastructure required.","themes":["Commercial & supply chain","Delivery & schedule","Cost & funding","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber (SRO rating). This is primarily due to the following factors. Successful delivery appears feasible but significant issues already exist requiring sustained management attention and mitigation, which are in place for these issues. Amber is considered…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"MOD_0112_1718-Q1","year":2024,"name":"Type 31e","department":"MOD","category":"Military Capability","description":"The Type 31 (T31) general purpose frigate programme is designed to deliver a general-purpose frigate capability and act as the pathfinder programme for the Government's National Shipbuilding Strategy. From the mid-2020s, T31 will be at the heart of the Royal Navy’s surface fleet, deterring aggression and maintaining the security of the UK’s interests. They will work alongside our Allies to deliver a credible UK-warship presence across the globe. Flexible and adaptable by design, T31 frigates will undertake missions such as interception and disruption of those using the sea for unlawful purposes, collecting intelligence, conducting defence engagement and assisting those in need.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remain at Amber. This is primarily due to the following factors. Successful delivery appears feasible but significant issues remain, requiring sustained management attention and mitigation. A commercial dispute with the Shipbuilder has been settled and the impact of inflation and a shortage of shipbuilding skills have been partially mitigated. Challenges also remain in proving the first of Class against an ambitious build timeline, a new combat system for the Royal Navy and the complex integration challenge.","startDate":"2016-04-01","endDate":"2030-05-31","scheduleNarrative":"Compared to financial year 22/23-Q4 the project's end-date at 23/24-Q4 increased from 2029-03-31 to 2030-05-31. This is primarily due to the following factors. Pressure to the schedule following dispute settlement is being assessed through schedule risk analysis and identification of opportunities between the MOD and Contractor. Any identified impact to Approved Dates will be subject to GMPP governance processes with the appropriate Approval Authorities.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.)","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.)","benefits":0.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 0m.","themes":["Commercial & supply chain","Delivery & schedule","Cost & funding","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remain at Amber. This is primarily due to the following factors. Successful delivery appears feasible but significant issues remain, requiring sustained management attention and mitigation. A commercial dispute with the Shipbuilder has been…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"MOD_0112_1718-Q1","year":2025,"name":"TYPE 31","department":"MoD","category":"Military Capability","description":"The Type 31 general purpose frigate programme is designed to deliver a general-purpose frigate capability and act as the pathfinder programme for the Government's National Shipbuilding Strategy. Type 31 will be at the heart of the Royal Navy’s surface fleet, deterring aggression and maintaining the security of the UK’s interests. They will work alongside our Allies to deliver a credible UK-warship presence across the globe. Flexible and adaptable by design, Type 31 frigates will undertake missions such as interception and disruption of those using the sea for unlawful purposes, collecting intelligence, conducting defence engagement and assisting those in need.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is RED, compared with the project's assessment last year of AMBER. This is due to the following factors. Successful delivery to meet the user requirements remains on track, but the impact of inflation will require a reset of the programme’s Approved Budgetary Limit. Challenges also remain in the first of class schedule against an ambitious build timeline, developing a new combat system for the Royal Navy and the complex integration challenge.","startDate":"2016-04-01","endDate":null,"scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/05/2030. .","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 43 - Commercial interests","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits","themes":["Commercial & supply chain","Delivery & schedule","Cost & funding","Scope & requirements"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is RED, compared with the project's assessment last year of AMBER. This is due to the following factors. Successful delivery to meet the user requirements remains on track, but the impact of inflation will require a reset of the programme’s Approved Budgetary Limit.…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"MOD_0112_1718-Q1","year":2026,"name":"TYPE 31","department":"MOD","category":"Military Capability","description":"The Type 31 general purpose frigate programme is designed to deliver a general purpose frigate capability and act as the pathfinder programme for the Government’s National Shipbuilding Strategy. T31 will be at the heart of the Royal Navy’s surface fleet, deterring aggression and maintaining the security of the UK’s interests. They will work alongside our Allies to deliver a credible UK warship presence across the globe. Flexible and adaptable by design, T31 frigates will undertake missions such as interception and disruption of those using the sea for unlawful purposes, collecting intelligence, conducting defence engagement, and assisting those in need.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Red. This is primarily due to the following factors‚ 1. Successful delivery to meet the User Requirements remains on track, but the impact of inflation will require a reset of the programme’s Approved Budgetary Limit following announcement of the Defence Investment Plan. 2. Challenges also remain in the first of class schedule against an ambitious build timeline, and the complex integration challenges.","startDate":"2016-04-01","endDate":"2033-07-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme end-date at 25/26-Q4 remained the same at 31/05/2030.","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Commercial & supply chain","Delivery & schedule","Cost & funding","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Red. This is primarily due to the following factors‚ 1. Successful delivery to meet the User Requirements remains on track, but the impact of inflation will require a reset of the programme’s Approved Budgetary Limit following announcement…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"MOD_0112_1718-Q1","year":2025,"name":"TYPE 31","department":"MoD","category":"Military Capability","description":"The Type 31 general purpose frigate programme is designed to deliver a general-purpose frigate capability and act as the pathfinder programme for the Government's National Shipbuilding Strategy. Type 31 will be at the heart of the Royal Navy’s surface fleet, deterring aggression and maintaining the security of the UK’s interests. They will work alongside our Allies to deliver a credible UK-warship presence across the globe. Flexible and adaptable by design, Type 31 frigates will undertake missions such as interception and disruption of those using the sea for unlawful purposes, collecting intelligence, conducting defence engagement and assisting those in need.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is RED, compared with the project's assessment last year of AMBER. This is due to the following factors. Successful delivery to meet the user requirements remains on track, but the impact of inflation will require a reset of the programme’s Approved Budgetary Limit. Challenges also remain in the first of class schedule against an ambitious build timeline, developing a new combat system for the Royal Navy and the complex integration challenge.","startDate":"2016-04-01","endDate":null,"scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/05/2030. .","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 43 - Commercial interests","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits","themes":["Commercial & supply chain","Delivery & schedule","Cost & funding","Scope & requirements"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is RED, compared with the project's assessment last year of AMBER. This is due to the following factors. Successful delivery to meet the user requirements remains on track, but the impact of inflation will require a reset of the programme’s Approved Budgetary Limit.…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":null,"attentionScore":49,"attentionReasons":["Current published delivery confidence is Red","In-year forecast variance is +43.0%"]},{"id":"DCMS_0019_2021-Q4","year":2026,"name":"Project Gigabit","department":"DSIT","category":"Infrastructure and Construction","description":"Project Gigabit provides gigabit-capable connectivity to homes and businesses that are not included in suppliers' commercial plans. The programme target is for next-generation gigabit broadband to be available nationwide by 2032.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at AMBER. UK Gigabit coverage reached 90.76% in June 2026, according to ThinkBroadband. The programme is progressing largely to plan but there are some concerns over supplier access to finance and supply chain risks which may impact delivery.","startDate":"2021-04-01","endDate":"2032-12-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 has been extended to 31/12/2032. This is to reflect a revised delivery timeline.","fyBaseline":686.07,"fyForecast":486.34,"fyVariance":29.11,"varianceNarrative":"The budget variance is a result of factors including the need for projects to re-plan to take account of changes in commercial coverage, and supplier delivery issues including highways access and wayleaves.","wholeLifeCost":5214.96,"costNarrative":"Compared to financial year 24/25-Q4 of £5,404m, the project’s departmentally agreed Whole Life Cost at 25/26-Q4 decreased to £4,831m. This is primarily due to the following factors, updated Open Market Review has fed into updated Central Delivery Forecast Model.","benefits":3967.67,"benefitsNarrative":"The baseline benefits have remained at £5,434m (between Q4 2024/24 and Q4 2025/26) as the same return has been reported during this period.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at AMBER. UK Gigabit coverage reached 90.76% in June 2026, according to ThinkBroadband. The programme is progressing largely to plan but there are some concerns over supplier access to finance and supply chain risks which may impact delivery.…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"DCMS_0019_2021-Q4","year":2021,"name":"UK Gigabit Programme","department":"DCMS","category":"Infrastructure and Construction","description":"The UK Gigabit Programme (Project Gigabit) will deliver subsidised gigabit-capable broadband to hard to reach areas of the UK that would otherwise have been left behind by broadband network providers in their commercial rollout plans. There will be local, regional and cross-regional contracts available for broadband network providers of all sizes to bid for, managed through close working relationships with local authorities and the devolved administrations. This approach will be complemented by vouchers, hubs, gigabit-capable Superfast contracts and barrier busting measures to improve pace and flexibility of delivery.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber/red.This is primarily due to the following factors: This is the first GMPP submission for UK Gigabit programme and therefore it is not possible to include a change in DCA since the last report. The current DCA is 'Amber/Red', reflecting the risk of suppliers not being able to deliver at the pace required.","startDate":"2021-04-01","endDate":"2030-12-31","scheduleNarrative":"The project end-date is 31 December 2030. This is primarily due to the following factors: There is no deviation to the schedule.","fyBaseline":15.24,"fyForecast":14.1,"fyVariance":-7.0,"varianceNarrative":"The budget variance exceeds 5%. The variance in 20/21 is driven by changes to BDUK's target operating model which impacted on implementation, including changes to recruitment profiling during 2020/21. This also pushed back timescales and spend for implementing bespoke IT systems.","wholeLifeCost":5035.24,"costNarrative":"The projects Baseline Whole Life Cost is �5035.24m. This is primarily due to the following factors: This is the first GMPP for the UKGP, and the programme is not yet in delivery so we have recorded no capital spend on this programme yet. However forecasted costs from previous business cases have been used to illustrate the expected cost of this programme, the overall lifetime costs are expected to be �5bn.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber/red.This is primarily due to the following factors: This is the first GMPP submission for UK Gigabit programme and therefore it is not possible to include a change in DCA since the last report. The current DCA is 'Amber/Red', reflecting the risk of suppliers not being able…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21"},{"id":"DCMS_0019_2021-Q4","year":2022,"name":"Project Gigabit","department":"DCMS","category":"Infrastructure and Construction","description":"The UK Gigabit Programme (Project Gigabit) will deliver subsidised gigabit-capable broadband to hard to reach areas of the UK that would otherwise have been left behind by broadband network providers in their commercial rollout plans. There will be local, regional and cross-regional contracts available for broadband network providers of all sizes to bid for, managed through close working relationships with local authorities and the devolved administrations. This approach will be complemented by vouchers, hubs, gigabit-capable Superfast contracts and barrier busting measures to improve pace and flexibility of delivery.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 decreased from Amber/red to Amber Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 improved from Amber/red to Amber. This improvement came as a result of the UK Gigabit Programme making progress against each of the IPA's Gateway 0 recommendations that were given to the Programme in September 2021. Notable areas of improvement included providing HMT with a better understanding of the Programme Business Case and rolling out an integrated resource plan for the Programme to help improve resource requirements and delivery forecasting. Some areas for further development include refining commercial strategy to account for changes to supplier landscape and in light of outcomes from stage 1 procurements.","startDate":"2021-04-01","endDate":"2030-12-31","scheduleNarrative":"Compared to 2021-Q4, your project end-date remained scheduled to finish on 31 DEC 2030 . This is primarily due to the following factors: There is no deviation to the schedule.","fyBaseline":138.0,"fyForecast":72.11,"fyVariance":-48.0,"varianceNarrative":"The budget variance exceeds 5%. Project Gigabit uses 4 delivery mechanisms to deliver gigabit speed broadband to the hardest to reach 20% in the UK. The delivery mechanisms include i) Gigabit Infrastructure Scheme (GIS) is by far the biggest element of the programme, Superfast Extension, Hubs and Vouchers. The demand products (Hubs and Vouchers) started in April 2021 while GIS has started with procurement which is currently ongoing. The overall expected lifetime costs are expected to be £5bn with £1.2bn allocated over the first 4 years of this programme. The budget allocated for 2021/22 totalled £120m, with a post supps budget of £78.6m. The 2021/22 outturn came to £57.2m which includes £9.15m of BCT (£4.5m SFE and £4.65m Hubs). PG lost £17.4m as part of the supplementary estimates. The main reason driving the underspend relates to a number of Hubs projects not proceeding as planned. We have also seen unexpected volatility with the vouchers forecast which has caused an underspend of £20.5m against the post supps budget. This was primarily caused by suppliers providing optimistic delivery forecasts.","wholeLifeCost":5035.0,"costNarrative":"Compared to 2021-Q4,the projects Baseline Whole Life Cost remained at 5035.24 (£m). This is primarily due to the following factors: Compared to 2021-Q4, the project's budgeted Whole Life Cost has been updated to 5002.00 (£m) following the outcome of a Treasury Approval Point in January 2022. The forecast has since reduced to £4,940.00 based on updated delivery plans. Changes to the target intervention area for Project Gigabit have emerged since budgets were agreed, requiring the timing of delivery and the overall cost per premise to be re-evaluated. The result of these changes has produced a forecast saving across the life of Project Gigabit.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 decreased from Amber/red to Amber Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 improved from Amber/red to Amber. This improvement came as a result of…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"DCMS_0019_2021-Q4","year":2023,"name":"Project Gigabit","department":"DSIT","category":"Infrastructure and Construction","description":"The UK Gigabit Programme (Project Gigabit) will deliver subsidised gigabit-capable broadband to hard to reach areas of the UK that would otherwise have been left behind by broadband network providers in their commercial rollout plans. There will be local, regional and cross-regional contracts available for broadband network providers of all sizes to bid for, managed through close working relationships with local authorities and the devolved administrations. This approach will be complemented by vouchers, hubs, gigabit-capable Superfast contracts and barrier busting measures to improve pace and flexibility of delivery.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. Project Gigabit has made good progress since the last IPA review, with the programme continuing to align to its time, cost and scope expectations, as set out in the business case. All recommendations from the previous gate 0 were acknowledged and actioned appropriately. Some areas for further improvement include seeking commercial support from the Cabinet Office to ensure that competition can be demonstrated for each procurement, and introducing a formal learning from experience regime to build on lessons learnt and pilot activity for the benefit of future Gigabit delivery activity.","startDate":"2021-04-01","endDate":"2030-12-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2030-12-31. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2030-12-31. This is primarily due to the following factors. There is no deviation to the schedule.","fyBaseline":198.1,"fyForecast":79.1,"fyVariance":-60.0,"varianceNarrative":"The budget variance exceeds 5%. The budget allocated for Project Gigabit (Capital) in 2022/23 totalled 164.3m, with a post supps budget of 48.5m. The 2022/23 outturn is currently forecasted to be 42.4m. The main reason driving the underspend, since the Supplementary Estimate position, relates to Vouchers, where the average value of a voucher was lower than expected with lower than expected claims, and Gigabit Infrastructure Subsidy (GIS) procurements and subsequent mobilisation taking longer than expected.","wholeLifeCost":5112.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 increased from 5035m. to 5112m. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 increased from 5035m. to 5112m. This is primarily due to the following factors. 8 (m) following the outcome of a Treasury Approval Point in January 2022. The forecast has since increased to 4,756.2 (m) based on updated delivery plans including the re-evaluation of assumptions including cost per premises and the timing of delivery. The result of these changes has still produced a forecast saving, with capital funding across the life of Project Gigabit being under 5bn.","benefits":13509.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 13509m. Benefits have changed due to the new benefits model and changes to the premises delivery profile for Project Gigabit products.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. Project Gigabit has…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"DCMS_0019_2021-Q4","year":2024,"name":"Project Gigabit","department":"DSIT","category":"Infrastructure and Construction","description":"The UK Gigabit Programme (Project Gigabit) will deliver subsidised gigabit-capable broadband to hard to reach areas of the UK that would otherwise have been left behind by broadband network providers in their commercial rollout plans. There will be local, regional and cross-regional contracts available for broadband network providers of all sizes to bid for, managed through close working relationships with local authorities and the devolved administrations. This approach will be complemented by vouchers, hubs, gigabit-capable Superfast contracts and barrier busting measures to improve pace and flexibility of delivery.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The Infrastructure and Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Amber, based on the most recent review undertaken in March 2024._x000D_ _x000D_ The review gave three recommendations. These were to develop a plan to complete remaining gigabit coverage, to develop the data strategy for both internal and external audiences, and to develop competencies for key team members including Local Delivery Leads and Contract Managers. Action is under way on each of these.","startDate":"2021-04-01","endDate":"2030-12-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2030-12-31. This is primarily due to the following factors. We expect all identified areas of the UK to be under a GIS contract or within the scope of a procurement by the end of 2024. This will be complemented by continued delivery through vouchers, including extension of vouchers to urban areas. The superfast programme will continue to deliver gigabit capable coverage until scheduled completion in 2028.","fyBaseline":423.3,"fyForecast":149.3,"fyVariance":-65.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. Budget/ forecast variance is high on Project Gigabit as on average there has been 63 days delay on estimated planned contract start dates on GIS. North Dorset & New Forest faced delays of greater than one month, as did Cumbria. Cumbria delivery was also cut in half for 2023/24 financial year. Cambridgeshire, Norfolk and Suffolk were all due to deliver premises, but none did in 2023/24","wholeLifeCost":5404.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 increased from 5112m. to 5404m. This is primarily due to the following factors. based on updated delivery plans including the re-evaluation of assumptions including cost per premises and the timing of delivery. The result of these changes has still produced a forecast saving, with capital funding across the life of Project Gigabit being under 5bn.","benefits":8202.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 2324-Q4 decreased from 13509m. to 8202m. The baseline benefits have decreased by about 5bn between Q4 2022/23 and Q4 2023/24. The number of premises fell by about 650,000 which explains the reduction in benefits. The benefits per premises are about the same between the two returns, so this is reassuring. The main reason for the reduction in premises will be changes in premises that are eligible for Project Gigabit, especially GIS.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The Infrastructure and Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Amber, based on the most recent review undertaken in March…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"DCMS_0019_2021-Q4","year":2025,"name":"Project Gigabit","department":"DSIT","category":"Infrastructure and Construction","description":"Deliver gigabit capable broadband to at least 85% of premises by 2025 and achieve full coverage as soon as possible. The government is subsidising deployment of non-commercial premises through Project Gigabit, other than premises which are not affordable or do not represent value for money.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ UK Gigabit coverage reached 87.1% in March 2025, according to Thinkbroadband, meaning the key Project Gigabit Programme target of 85% coverage by the end of 2025 has been met. The programme is progressing largely to plan but there are some concerns over supplier access to finance and supply chain risks that may impact delivery.","startDate":"2021-04-01","endDate":"2030-12-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/12/2030. This is primarily due to the following factors The government’s target at Q4 2024/25 was for next-generation, gigabit broadband to be available to 85% of the UK by 2025 and nationwide by 2030.","fyBaseline":423.3,"fyForecast":149.3,"fyVariance":64.73,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The budget variance is a result of factors including the need for projects to re-plan to take account of changes in commercial coverage, and supplier delivery issues including highways access and wayleaves.","wholeLifeCost":5404.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 5404. This is primarily due to the following factors‚ Answer - There is no visibility to support the updated amounts submitted for year 2033 which should have remained in line with Q4 23/24 submission. This seems to be consistent with an error in submission as we are not expecting RDEL spend to drop between both submissions. We are however expecting RDEL spend to be updated once we have more clarity on the RDEL envelope approved following Spending Review discussions and therefore will be updated in future returns.","benefits":8202.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 8202. This is primarily due to the following factors‚ Baseline benefits have decreased from £8,202m (Q4 2023/24) to £5,434m (Q4 2024/25). This is mainly due to the change in counterfactual between these two quarters, which decreased counterfactual prems from about 967k to 550k prems. The counterfactual was originally the EECC counterfactual, which delivered prems up to 2037/38. However, the new counterfactual assumes Project Gigabit is cancelled at the end of 2025/26, which results in less counterfactual prems being delivered.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ UK Gigabit coverage reached 87.1% in March 2025, according to Thinkbroadband, meaning the key Project Gigabit Programme target of 85% coverage by the end of 2025 has…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"DCMS_0019_2021-Q4","year":2026,"name":"Project Gigabit","department":"DSIT","category":"Infrastructure and Construction","description":"Project Gigabit provides gigabit-capable connectivity to homes and businesses that are not included in suppliers' commercial plans. The programme target is for next-generation gigabit broadband to be available nationwide by 2032.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at AMBER. UK Gigabit coverage reached 90.76% in June 2026, according to ThinkBroadband. The programme is progressing largely to plan but there are some concerns over supplier access to finance and supply chain risks which may impact delivery.","startDate":"2021-04-01","endDate":"2032-12-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 has been extended to 31/12/2032. This is to reflect a revised delivery timeline.","fyBaseline":686.07,"fyForecast":486.34,"fyVariance":29.11,"varianceNarrative":"The budget variance is a result of factors including the need for projects to re-plan to take account of changes in commercial coverage, and supplier delivery issues including highways access and wayleaves.","wholeLifeCost":5214.96,"costNarrative":"Compared to financial year 24/25-Q4 of £5,404m, the project’s departmentally agreed Whole Life Cost at 25/26-Q4 decreased to £4,831m. This is primarily due to the following factors, updated Open Market Review has fed into updated Central Delivery Forecast Model.","benefits":3967.67,"benefitsNarrative":"The baseline benefits have remained at £5,434m (between Q4 2024/24 and Q4 2025/26) as the same return has been reported during this period.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at AMBER. UK Gigabit coverage reached 90.76% in June 2026, according to ThinkBroadband. The programme is progressing largely to plan but there are some concerns over supplier access to finance and supply chain risks which may impact delivery.…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"DCMS_0019_2021-Q4","year":2025,"name":"Project Gigabit","department":"DSIT","category":"Infrastructure and Construction","description":"Deliver gigabit capable broadband to at least 85% of premises by 2025 and achieve full coverage as soon as possible. The government is subsidising deployment of non-commercial premises through Project Gigabit, other than premises which are not affordable or do not represent value for money.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ UK Gigabit coverage reached 87.1% in March 2025, according to Thinkbroadband, meaning the key Project Gigabit Programme target of 85% coverage by the end of 2025 has been met. The programme is progressing largely to plan but there are some concerns over supplier access to finance and supply chain risks that may impact delivery.","startDate":"2021-04-01","endDate":"2030-12-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/12/2030. This is primarily due to the following factors The government’s target at Q4 2024/25 was for next-generation, gigabit broadband to be available to 85% of the UK by 2025 and nationwide by 2030.","fyBaseline":423.3,"fyForecast":149.3,"fyVariance":64.73,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The budget variance is a result of factors including the need for projects to re-plan to take account of changes in commercial coverage, and supplier delivery issues including highways access and wayleaves.","wholeLifeCost":5404.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 5404. This is primarily due to the following factors‚ Answer - There is no visibility to support the updated amounts submitted for year 2033 which should have remained in line with Q4 23/24 submission. This seems to be consistent with an error in submission as we are not expecting RDEL spend to drop between both submissions. We are however expecting RDEL spend to be updated once we have more clarity on the RDEL envelope approved following Spending Review discussions and therefore will be updated in future returns.","benefits":8202.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 8202. This is primarily due to the following factors‚ Baseline benefits have decreased from £8,202m (Q4 2023/24) to £5,434m (Q4 2024/25). This is mainly due to the change in counterfactual between these two quarters, which decreased counterfactual prems from about 967k to 550k prems. The counterfactual was originally the EECC counterfactual, which delivered prems up to 2037/38. However, the new counterfactual assumes Project Gigabit is cancelled at the end of 2025/26, which results in less counterfactual prems being delivered.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ UK Gigabit coverage reached 87.1% in March 2025, according to Thinkbroadband, meaning the key Project Gigabit Programme target of 85% coverage by the end of 2025 has…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":731,"attentionScore":48,"attentionReasons":["Current published delivery confidence is Amber","Published end date moved 731 days later","In-year forecast variance is +29.1%"]},{"id":"HO_0228_2223-Q4","year":2026,"name":"ANTI-MONEY LAUNDERING AND ASSET RECOVERY (AMLAR)","department":"HO","category":"Government Transformation and Service Delivery","description":"The AMLAR Programme will uplift the law enforcement response to money laundering, by improving people capacity, skills capability and technology to increase the prevention, detection, and disruption of money laundering and the recovery of criminal assets. The AMLAR Programme contributes to HM Government (HMG) commitments, including those set out in Economic Crime Plan 2 , published in March 2023, a key outcome of which is to reduce money laundering and recover more criminal assets.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared with FY24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating decreased to AMBER in FY25/26 Q4. This is primarily due to two changes at portfolio level: • A 5% shortfall in Financial Crime officers in 25/26, resulting in two milestones moving into 26/27. The remaining officers will now be recruited across Q1–Q2 of 26/27. • A delay to the delivery of the new crypto storage solution, aligned to the end of the existing business as usual (BAU) storage contract. This adjusts the delivery milestone from June to December 2026. These changes do not impact programme cost, and forecast benefit reductions remain within programme tolerance levels. Throughout FY25/26, AMLAR enabled several major operations: • Operation Destabilise - (NCA-led international investigation) disrupting Russian money laundering networks linked to organised crime, drug trafficking and espionage. This led to 84 arrests and £20m seized. • Operation Hawksmoor - resulting in multiple arrests, the seizure of high value vehicles, £60,000 cash, and designer watches. • Operation Machinize - targeting high street crime, money laundering and modern slavery. Outcomes included closure of 10 shops, seizure of £40,000 cash, 200,000 cigarettes, 7,000 tobacco packs, 8,000 illegal vapes, and 2 vehicles. In FY25/26, the programme has delivered an additional £60m in criminal asset recovery, with an additional £290m restrained but not yet recovered, exceeding yearly benefit targets. It has also delivered 758 money laundering disruptions against a target of 404.","startDate":"2023-04-01","endDate":null,"scheduleNarrative":"Compared with FY24/25 Q4, the project end date has moved from 31/03/2026 to 30/09/2027. This change reflects a rebaseline of the programme to align with the decommissioning of the BAU Joint Asset Recovery Database (JARD). JARD decommissioning is a critical dependency for the delivery of the new Asset Recovery IT Service. Decommissioning is scheduled to complete by September 2027, which drives the extension of the programme timeline.","fyBaseline":39.23,"fyForecast":35.74,"fyVariance":8.89,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors: recruitment and milestone delays.","wholeLifeCost":368.47,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) decreased from last year's £414.2m to £401.7m. This is primarily due to the following factors: reduced FY 24/25 Economic Crime Levy receipts which impacted the programme’s ability to grow in line with original recruitment delivery plans. Civil Service headcount cap restrictions also impacted the national Crime Agencies ability to grow as planned, which resulted in the deferral of circa 70 resources to other delivery partner areas at a reduced cost per full time equivalent resource.","benefits":1097.24,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) increased from £1214.43m to £1215.46m. This is primarily due to the following factors: Further work was undertaken to refine benefit modelling, removing areas of optimism bias that was included in the original model to reflect uncertainties at the time. The outputs from the recruited Financial Investigators has also been refined resulting in increased asset recovery outputs.","themes":["Delivery & schedule","Cost & funding","Commercial & supply chain","Governance & assurance"],"evidenceExcerpt":"Compared with FY24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating decreased to AMBER in FY25/26 Q4. This is primarily due to two changes at portfolio level: • A 5% shortfall in Financial Crime officers in 25/26, resulting in two milestones moving into 26/27. The remaining officers will now be recruited across Q1–Q2 of 26/27. • A delay to…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"HO_0228_2223-Q4","year":2024,"name":"Anti-Money Laundering and Asset Recovery (AMLAR)","department":"HO","category":"Government Transformation and Service Delivery","description":"Monetary gain sits at the heart of most criminality. To benefit, criminals need to launder their ill-gotten gains. Tackling money laundering requires a co-ordinated, cross system response in order to disrupt and dismantle criminal business models that cause significant harm to victims and undermines our democracy and economy. _x000D_ _x000D_ The AMLAR Programme builds on the Economic Crime Plan (HM Treasury and Home Office, 2019), Asset Recovery Action Plan (Home Office, 2019), and UK Anti-Corruption Strategy. It will deliver actions in Economic Crime Plan 2 (2023) to uplift strategic communications, intelligence and investigative capability and new technology, to improve the prevention, detection and disruption of money laundering and increase the recovery of criminal assets.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. The programme delivery confidence is rated at Amber due to a reduction in Economic Crime Levy receipts for FY24/25 and restrictions placed across the Civil Service headcount, affecting several partner organisations, which is likely to impact delivery milestones and benefit realisation timeframes, with some scope deferred to FY25/26. The programme is refining the benefits model in alignment with an InvestCo appearance in July 2024.","startDate":"2023-04-01","endDate":"2026-03-31","scheduleNarrative":"The project's end-date at 23/24-Q4 is 2026-03-31. This is primarily due to the following factors. Any impacts of Economic Crime Levy receipts provided by HMT for FY24/25 will be addressed in FY25/26. Project end-date is not expected to change.","fyBaseline":22.6,"fyForecast":20.0,"fyVariance":-12.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. Underspend across the programme is primarily due to challenges in recruitment within the first year in the delivery partners. Work is ongoing between Home Office and delivery partners to mitigate this risk going forward.","wholeLifeCost":429.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 23/24-Q4 is 429m. This is primarily due to the following factors. The Whole Life Cost of the programme has not changed and is fully funded by Economic Crime Levy receipts from HMT.","benefits":1099.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 1099m. The Programme will not start to deliver benefits until FY24/25.","themes":["Cost & funding","Delivery & schedule","Scope & requirements"],"evidenceExcerpt":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. The programme delivery confidence is rated at Amber due to a reduction in Economic Crime Levy receipts for FY24/25 and restrictions placed across the Civil Service headcount, affecting several partner organisations,…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"HO_0228_2223-Q4","year":2025,"name":"ANTI-MONEY LAUNDERING AND ASSET RECOVERY (AMLAR)","department":"HO","category":"Government Transformation and Service Delivery","description":"The AMLAR Programme will uplift the law enforcement response to money laundering, by improving people capacity, skills capability and technology to increase the prevention, detection, and disruption of money laundering and the recovery of criminal assets. The AMLAR Programme contributes to HM Government (HMG) commitments, including those set out in Economic Crime Plan 2 , published in March 2023, a key outcome of which is to reduce money laundering and recover more criminal assets.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors‚ Recruitment targets were met with 290 Financial Crime officers now in post. The programme exceeded benefit targets through the recovery of £60m in criminal assets, with a further £100m seized. The programme also enabled over 400 money laundering disruptions. AMLAR enabled Operation Destabilise, a major international investigation led by the National Crime Agency which disrupted Russian money laundering networks linked to organised crime, drug trafficking and espionage activities. This operation resulted in 84 arrests and over £20 million seized. AMLAR also enabled Operation Hawksmoor where several arrests were made, as well as high-value cars, £60,000 cash and designer watches were seized.","startDate":"2023-04-01","endDate":"2026-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2026. This is primarily due to the following factors‚ All milestones completed to time and quality. 3-year delivery cycle completes at the end of FY25/26, with an assumption that the programme will then transition into business as usual (BAU).","fyBaseline":26.6,"fyForecast":26.6,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%. The budget variance is less than or equal to 5%.","wholeLifeCost":414.2,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 429 to 414. This is primarily due to the following factors‚ Reduced Economic Crime Levy receipts for FY24/25. Allocations as per the Business Case have been confirmed by HMT for FY25/26.","benefits":1214.43,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 1099 to 1214. This is primarily due to the following factors‚ Further work was undertaken to refine benefit modelling with the programme now reporting benefits associated with the Economic Crime and Corporate Transparency Bill and the additional powers to recover cryptoassets, alongside benefits associated with training reform and cost/efficiency savings through the remediation of the Joint Asset Recovery Database (JARD).","themes":["Cost & funding","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors‚ Recruitment targets were met with 290 Financial Crime officers now in post. The programme exceeded benefit targets through the recovery of £60m in…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"HO_0228_2223-Q4","year":2026,"name":"ANTI-MONEY LAUNDERING AND ASSET RECOVERY (AMLAR)","department":"HO","category":"Government Transformation and Service Delivery","description":"The AMLAR Programme will uplift the law enforcement response to money laundering, by improving people capacity, skills capability and technology to increase the prevention, detection, and disruption of money laundering and the recovery of criminal assets. The AMLAR Programme contributes to HM Government (HMG) commitments, including those set out in Economic Crime Plan 2 , published in March 2023, a key outcome of which is to reduce money laundering and recover more criminal assets.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared with FY24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating decreased to AMBER in FY25/26 Q4. This is primarily due to two changes at portfolio level: • A 5% shortfall in Financial Crime officers in 25/26, resulting in two milestones moving into 26/27. The remaining officers will now be recruited across Q1–Q2 of 26/27. • A delay to the delivery of the new crypto storage solution, aligned to the end of the existing business as usual (BAU) storage contract. This adjusts the delivery milestone from June to December 2026. These changes do not impact programme cost, and forecast benefit reductions remain within programme tolerance levels. Throughout FY25/26, AMLAR enabled several major operations: • Operation Destabilise - (NCA-led international investigation) disrupting Russian money laundering networks linked to organised crime, drug trafficking and espionage. This led to 84 arrests and £20m seized. • Operation Hawksmoor - resulting in multiple arrests, the seizure of high value vehicles, £60,000 cash, and designer watches. • Operation Machinize - targeting high street crime, money laundering and modern slavery. Outcomes included closure of 10 shops, seizure of £40,000 cash, 200,000 cigarettes, 7,000 tobacco packs, 8,000 illegal vapes, and 2 vehicles. In FY25/26, the programme has delivered an additional £60m in criminal asset recovery, with an additional £290m restrained but not yet recovered, exceeding yearly benefit targets. It has also delivered 758 money laundering disruptions against a target of 404.","startDate":"2023-04-01","endDate":null,"scheduleNarrative":"Compared with FY24/25 Q4, the project end date has moved from 31/03/2026 to 30/09/2027. This change reflects a rebaseline of the programme to align with the decommissioning of the BAU Joint Asset Recovery Database (JARD). JARD decommissioning is a critical dependency for the delivery of the new Asset Recovery IT Service. Decommissioning is scheduled to complete by September 2027, which drives the extension of the programme timeline.","fyBaseline":39.23,"fyForecast":35.74,"fyVariance":8.89,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors: recruitment and milestone delays.","wholeLifeCost":368.47,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) decreased from last year's £414.2m to £401.7m. This is primarily due to the following factors: reduced FY 24/25 Economic Crime Levy receipts which impacted the programme’s ability to grow in line with original recruitment delivery plans. Civil Service headcount cap restrictions also impacted the national Crime Agencies ability to grow as planned, which resulted in the deferral of circa 70 resources to other delivery partner areas at a reduced cost per full time equivalent resource.","benefits":1097.24,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) increased from £1214.43m to £1215.46m. This is primarily due to the following factors: Further work was undertaken to refine benefit modelling, removing areas of optimism bias that was included in the original model to reflect uncertainties at the time. The outputs from the recruited Financial Investigators has also been refined resulting in increased asset recovery outputs.","themes":["Delivery & schedule","Cost & funding","Commercial & supply chain","Governance & assurance"],"evidenceExcerpt":"Compared with FY24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating decreased to AMBER in FY25/26 Q4. This is primarily due to two changes at portfolio level: • A 5% shortfall in Financial Crime officers in 25/26, resulting in two milestones moving into 26/27. The remaining officers will now be recruited across Q1–Q2 of 26/27. • A delay to…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"HO_0228_2223-Q4","year":2025,"name":"ANTI-MONEY LAUNDERING AND ASSET RECOVERY (AMLAR)","department":"HO","category":"Government Transformation and Service Delivery","description":"The AMLAR Programme will uplift the law enforcement response to money laundering, by improving people capacity, skills capability and technology to increase the prevention, detection, and disruption of money laundering and the recovery of criminal assets. The AMLAR Programme contributes to HM Government (HMG) commitments, including those set out in Economic Crime Plan 2 , published in March 2023, a key outcome of which is to reduce money laundering and recover more criminal assets.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors‚ Recruitment targets were met with 290 Financial Crime officers now in post. The programme exceeded benefit targets through the recovery of £60m in criminal assets, with a further £100m seized. The programme also enabled over 400 money laundering disruptions. AMLAR enabled Operation Destabilise, a major international investigation led by the National Crime Agency which disrupted Russian money laundering networks linked to organised crime, drug trafficking and espionage activities. This operation resulted in 84 arrests and over £20 million seized. AMLAR also enabled Operation Hawksmoor where several arrests were made, as well as high-value cars, £60,000 cash and designer watches were seized.","startDate":"2023-04-01","endDate":"2026-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2026. This is primarily due to the following factors‚ All milestones completed to time and quality. 3-year delivery cycle completes at the end of FY25/26, with an assumption that the programme will then transition into business as usual (BAU).","fyBaseline":26.6,"fyForecast":26.6,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%. The budget variance is less than or equal to 5%.","wholeLifeCost":414.2,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 429 to 414. This is primarily due to the following factors‚ Reduced Economic Crime Levy receipts for FY24/25. Allocations as per the Business Case have been confirmed by HMT for FY25/26.","benefits":1214.43,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 1099 to 1214. This is primarily due to the following factors‚ Further work was undertaken to refine benefit modelling with the programme now reporting benefits associated with the Economic Crime and Corporate Transparency Bill and the additional powers to recover cryptoassets, alongside benefits associated with training reform and cost/efficiency savings through the remediation of the Joint Asset Recovery Database (JARD).","themes":["Cost & funding","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors‚ Recruitment targets were met with 290 Financial Crime officers now in post. The programme exceeded benefit targets through the recovery of £60m in…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":1,"transition":"Worsened","endDateDeltaDays":null,"attentionScore":46,"attentionReasons":["Current published delivery confidence is Amber","Published rating worsened from Green to Amber","In-year forecast variance is +8.9%"]},{"id":"MOD_0121_2021-Q4","year":2026,"name":"COLLECTIVE TRAINING TRANSFORMATION PROGRAMME","department":"MOD","category":"Military Capability","description":"The Collective Training Transformation Programme (CTTP) will deliver through a long-term, collaborative relationship with industry the the Army Collective Training System . It will give the Army greater flexibility to train when, where and how it needs in order to meet Defence outputs. Through improved access to data analytics and a more flexible blend of live, virtual, and constructive training thereby improving the training experience all levels.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors. 1. The fundamentals of the programme remain sound and the need is compelling. 2. The resourcing position has improved and the commercial competition has concluded with a Preferred Tenderer being declared. 3.The Full Business Case has been submitted and has been assured by NISTA with a positive assessment of delivery confidence. The programme remains on schedule for a June 2026 Contract Award.","startDate":"2018-08-12","endDate":"2040-06-10","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 increased from 31/03/2032 to 11/06/2041 . This is primarily due to the following factors. 1. This is primarily due to 15 year contract award intended for 11/06/2026 . Contract award has slipped by circa three months due to the delay in the release of the Defence Investment Plan (DIP). 2. However, confirmation of affordability and submission of the Full Business Case into the approvals process has been made. CTTP remains on track for a June 26 Contract Award.","fyBaseline":11.6,"fyForecast":8.9,"fyVariance":23.24,"varianceNarrative":"The budget variance is less than 5%.","wholeLifeCost":2083.25,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) increased from £2106.59m to £2676.32M to This is primarily due to the following factors 1. Whole Life Costs has been updated to reflect the Full Business Case final costings and contract duration.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Commercial & supply chain","Cost & funding","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors. 1. The fundamentals of the programme remain sound and the need is compelling. 2. The resourcing position has improved and the commercial competition has concluded with a Preferred…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"MOD_0121_2021-Q4","year":2021,"name":"Collective Training Transformation Programme","department":"MOD","category":"Military Capability","description":"The Collective Training Transformation Programme seeks to transform both the management and delivery of training and the experience for those going through training.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber.This is primarily due to the following factors: While there is a clear, resourced and detailed schedule in place to develop a robust Outline Business Case by mid-2022, resourcing within the core Programme team and cost pressure against the 10 year funding profile still need to be addressed. Some improvement in the manning situation should be delivered within the next few months as new staff are recruited in, and in the meantime, contractor support is being used to address the key capability gaps. Shortfalls in the 10 year funding profile against the resourcing requirement will be raised to the Army Top Level Budget holder for consideration for relief within the next planning round.","startDate":"2018-10-12","endDate":"2032-01-01","scheduleNarrative":"The project end-date is 01 January 2032.","fyBaseline":5.95,"fyForecast":5.95,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":976.26,"costNarrative":"The projects Baseline Whole Life Cost is �976.26m. This is primarily due to the following factors: Financial Year 22/23 onwards forecast is based on the Collective Training Transformation Programme's Enterprise cost model V0.1. Profiles have not yet been categorised into Defence Expenditure Limits and are presented on a deterministic outcome only.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Workforce & capability","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber.This is primarily due to the following factors: While there is a clear, resourced and detailed schedule in place to develop a robust Outline Business Case by mid-2022, resourcing within the core Programme team and cost pressure against the 10 year funding profile still…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21"},{"id":"MOD_0121_2021-Q4","year":2022,"name":"Collective Training Transformation Programme","department":"MOD","category":"Military Capability","description":"The Collective Training Transformation Programme seeks to transform both the management and delivery of training and the experience for those going through training.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber. This is primarily due to the following factors: Work on the Concept Phase has progressed according to plan with risk mitigation in place throughout the year.","startDate":"2018-10-12","endDate":"2032-01-01","scheduleNarrative":"Compared to 2021-Q4, the project end-date remained scheduled to finish on 01 January 2032.","fyBaseline":9.65,"fyForecast":9.65,"fyVariance":0.0,"varianceNarrative":"The budget variance is inferior or equal to 5%.","wholeLifeCost":655.0,"costNarrative":"Compared to 2021-Q4, the projects Baseline Whole Life Cost decreased from 860.61 (£m) to 654.53 (£m). This is primarily due to the following factors: Whole life costs have reduced compared to the previous year's figures as a result of three factors; re-profiling of delivery plans, greater maturity in cost estimates and delivery of some interim capabilities out with Collective Training Transformation Programme.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber. This is primarily due to the following factors: Work on the Concept Phase has progressed according to plan with risk mitigation in place throughout the year. Compared to 2021-Q4, the project end-date remained scheduled to…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"MOD_0121_2021-Q4","year":2023,"name":"Collective Training Transformation Programme","department":"MOD","category":"Military Capability","description":"The Collective Training Transformation Programme will deliver the Future Collective Training System to transform collective training for the Army. Through a long-term, collaborative relationship with industry the Future Collective Training System will deliver increased training system flexibility to allow the Army to train when, where and how it needs in order to meet Defence outputs. Through improved access to data analytics and a more flexible blend of live, virtual, and constructive training, the Future Collective Training System will improve the training enterprise and experience for soldiers and commanders at all levels.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. Good progress has been made during the past 12 months including securing Outline Business Case approval.There are however still many uncertainties and risks between now and Full Business Case. Furthermore, approvals are only given at 50% confidence and so prudence in overall Delivery Confidence Assessment is appropriate.","startDate":"2018-10-12","endDate":"2040-03-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 increased from 2032-01-01 to 2040-03-31. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 increased from 01/01/2032 to 31/03/2040. This is primarily due to the following factor: The project end date has been taken to the end of the 15 year contract award period and not the 10 year planning cycle.","fyBaseline":8.95,"fyForecast":5.44,"fyVariance":-39.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors: Delays in letting support contracts and a delayed internal transfer of funding for staff.","wholeLifeCost":974.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 increased from 655m. to 974m. This is primarily due to the following factors. The Whole Life Cost has increased as the Project End date is now taken to the end of the 15 year contract award period and not the 10 year planning cycle. The underlying costs have remained stable.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This programme does not report cashable benefits. Its aim is to provision the armed forces with the equipment and / or infrastructure required.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. Good progress has been made during the past 12 months including securing Outline Business Case approval.There are however still many uncertainties and risks between…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"MOD_0121_2021-Q4","year":2024,"name":"Collective Training Transformation Programme","department":"MOD","category":"Military Capability","description":"The Collective Training Transformation Programme (CTTP) will deliver the Future Collective Training System (FCTS) to transform collective training for the Army. Through a long-term, collaborative relationship with industry the FCTS will deliver increased training system flexibility to allow the Army to train when, where and how it needs in order to meet Defence outputs. Through improved access to data analytics and a more flexible blend of live, virtual, and constructive training, the FCTS will improve the training enterprise and experience for soldiers and commanders at all levels.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Red. This is primarily due to the following factors. Chronic under-resourcing of the programme team and the impact of delays to the commercial process.","startDate":"2018-10-12","endDate":"2032-03-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the programme's end-date at 23/24-Q4 remained scheduled to finish on 2032-03-31.","fyBaseline":19.7,"fyForecast":9.87,"fyVariance":-49.898,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. Underspend due to delays in the build programme for some training infrastructure works which are being funded as pathfinders for CTTP. The delays will not affect the programme overall.","wholeLifeCost":1981.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 increased from 974m. to 1981m. This is primarily due to the following factors. Due to a change to the way the programme has reported in the past, the previous WLC provided was the 10 year cost profile. The current WLC is the true cost of the programme, hence the reported increase since last year's report.","benefits":0.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 0m.","themes":["Cost & funding","Workforce & capability","Commercial & supply chain","Delivery & schedule"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Red. This is primarily due to the following factors. Chronic under-resourcing of the programme team and the impact of delays to the commercial process. Compared to financial year 22/23-Q4, the programme's end-date at 23/24-Q4 remained scheduled to finish on…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"MOD_0121_2021-Q4","year":2025,"name":"COLLECTIVE TRAINING TRANSFORMATION PROGRAMME","department":"MoD","category":"Military Capability","description":"The Collective Training Transformation Programme (CTTP) will deliver the Future Collective Training System (FCTS) to transform collective training for the Army. Through a long-term, collaborative relationship with industry the FCTS will deliver increased training system flexibility to allow the Army to train when, where and how it needs in order to meet Defence outputs. Through improved access to data analytics and a more flexible blend of live, virtual, and constructive training, the FCTS will improve the training enterprise and experience for soldiers and commanders at all levels.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 increased from RED to AMBER. This is primarily due to the following factors. The fundamentals of the programme remain sound and the need is compelling. Workforce numbers have improved in the latter half of the year leading to increased confidence of being able to deliver to plan.","startDate":"2018-10-12","endDate":"2032-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2032. This is primarily due to the following factors. Compared to the financial year 23/24-Q4, the projects end-date at 24/25-Q4 remains sheduled to finish on 31-03-32.","fyBaseline":16.38,"fyForecast":16.38,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":2106.6,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 1981 to 2106. This is primarily due to the following factors. Compared to financial year 23/24-Q4, the programme's departmental-agreed forecast Whole Life Cost at 24/25-Q4 increased from £1980.679M to £ 2106.596M. This is primarily due to the following factor: initial cost estimates from Industry being higher than anticipated.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits","themes":["Cost & funding","Delivery & schedule","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 increased from RED to AMBER. This is primarily due to the following factors. The fundamentals of the programme remain sound and the need is compelling. Workforce numbers have improved in the latter half of the year leading to increased confidence of being able to…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"MOD_0121_2021-Q4","year":2026,"name":"COLLECTIVE TRAINING TRANSFORMATION PROGRAMME","department":"MOD","category":"Military Capability","description":"The Collective Training Transformation Programme (CTTP) will deliver through a long-term, collaborative relationship with industry the the Army Collective Training System . It will give the Army greater flexibility to train when, where and how it needs in order to meet Defence outputs. Through improved access to data analytics and a more flexible blend of live, virtual, and constructive training thereby improving the training experience all levels.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors. 1. The fundamentals of the programme remain sound and the need is compelling. 2. The resourcing position has improved and the commercial competition has concluded with a Preferred Tenderer being declared. 3.The Full Business Case has been submitted and has been assured by NISTA with a positive assessment of delivery confidence. The programme remains on schedule for a June 2026 Contract Award.","startDate":"2018-08-12","endDate":"2040-06-10","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 increased from 31/03/2032 to 11/06/2041 . This is primarily due to the following factors. 1. This is primarily due to 15 year contract award intended for 11/06/2026 . Contract award has slipped by circa three months due to the delay in the release of the Defence Investment Plan (DIP). 2. However, confirmation of affordability and submission of the Full Business Case into the approvals process has been made. CTTP remains on track for a June 26 Contract Award.","fyBaseline":11.6,"fyForecast":8.9,"fyVariance":23.24,"varianceNarrative":"The budget variance is less than 5%.","wholeLifeCost":2083.25,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) increased from £2106.59m to £2676.32M to This is primarily due to the following factors 1. Whole Life Costs has been updated to reflect the Full Business Case final costings and contract duration.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Commercial & supply chain","Cost & funding","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors. 1. The fundamentals of the programme remain sound and the need is compelling. 2. The resourcing position has improved and the commercial competition has concluded with a Preferred…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"MOD_0121_2021-Q4","year":2025,"name":"COLLECTIVE TRAINING TRANSFORMATION PROGRAMME","department":"MoD","category":"Military Capability","description":"The Collective Training Transformation Programme (CTTP) will deliver the Future Collective Training System (FCTS) to transform collective training for the Army. Through a long-term, collaborative relationship with industry the FCTS will deliver increased training system flexibility to allow the Army to train when, where and how it needs in order to meet Defence outputs. Through improved access to data analytics and a more flexible blend of live, virtual, and constructive training, the FCTS will improve the training enterprise and experience for soldiers and commanders at all levels.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 increased from RED to AMBER. This is primarily due to the following factors. The fundamentals of the programme remain sound and the need is compelling. Workforce numbers have improved in the latter half of the year leading to increased confidence of being able to deliver to plan.","startDate":"2018-10-12","endDate":"2032-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2032. This is primarily due to the following factors. Compared to the financial year 23/24-Q4, the projects end-date at 24/25-Q4 remains sheduled to finish on 31-03-32.","fyBaseline":16.38,"fyForecast":16.38,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":2106.6,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 1981 to 2106. This is primarily due to the following factors. Compared to financial year 23/24-Q4, the programme's departmental-agreed forecast Whole Life Cost at 24/25-Q4 increased from £1980.679M to £ 2106.596M. This is primarily due to the following factor: initial cost estimates from Industry being higher than anticipated.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits","themes":["Cost & funding","Delivery & schedule","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 increased from RED to AMBER. This is primarily due to the following factors. The fundamentals of the programme remain sound and the need is compelling. Workforce numbers have improved in the latter half of the year leading to increased confidence of being able to…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":2993,"attentionScore":46,"attentionReasons":["Current published delivery confidence is Amber","Published end date moved 2,993 days later","In-year forecast variance is +23.2%"]},{"id":"MOJ_0144_2223-Q2","year":2026,"name":"Small Secure Houseblocks","department":"MOJ","category":"Infrastructure and Construction","description":"The Small Secure Houseblock project supports our 20,000 additional prison places commitment; its scope is to create units that will provide secure, permanent accommodation within the closed estate. The project provides a new style of accommodation for deployment in existing prison sites. Small Secure Houseblock units meet the technical needs and security standards required for Category C prisons.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25-Q4, the NISTA Delivery Confidence Assessment (DCA) has increased from Red to Amber. This is primarily due to improved time confidence following receipt of post-construction mobilisation plans.","startDate":"2021-11-15","endDate":"2028-10-27","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end date at 25/26-Q4 changed from 16/12/27 to 27/10/28. This is primarily due to changes in project scope resulting in amendment of the project timeline.","fyBaseline":489.45,"fyForecast":341.51,"fyVariance":30.23,"varianceNarrative":"Compared to financial year 2024/25‑Q4, the in‑year forecast for 25/26 shows an underspend against the baseline. The underspend is due to reduce in-year activities, requiring costs to be re-profiled into future years.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"This project currently reports no monetised benefits. Due to the projected increasing prisons population, this project focusses on increasing capacity and there are no monetised benefits to be claimed. The project's other benefits are defined in the current baseline as: construction benefits and outcomes (capacity, modern methods of construction and sustainability); to enable an improvement in prisoner rehabilitation outcomes; and, during its construction, deliver local community benefits.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 24/25-Q4, the NISTA Delivery Confidence Assessment (DCA) has increased from Red to Amber. This is primarily due to improved time confidence following receipt of post-construction mobilisation plans. Compared to financial year 24/25-Q4, the project's end date at 25/26-Q4 changed from 16/12/27 to 27/10/28. This is primarily due to…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"MOJ_0144_2223-Q2","year":2023,"name":"Small Secure Houseblocks","department":"MOJ","category":"Infrastructure and Construction","description":"Small Secure Houseblock units will provide secure, permanent accommodation within the closed estate. The project provides a new style of accommodation for deployment in existing prison sites. Small Secure Houseblock units meet the technical needs and security standards required for Category C prisons.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 is Amber. This is primarily due to the following factors. This is thefirst timedata has been published for this project, which has been added to GMPP over the last year.The Amber assessment is due to inherent risk in the project's timelines. .","startDate":"2021-11-15","endDate":null,"scheduleNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","fyBaseline":13.3,"fyForecast":6.69,"fyVariance":-50.0,"varianceNarrative":"The underspend is due to procurement challenges","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This project currently reports no monetised benefits. Due to the projected increasing prisons population, this project focusses on increasing capacity and there are no monetised benefits to be claimed. The programme's other benefits are defined in the current baseline as: construction benefits and outcomes (capacity, modern methods of construction and sustainability); to enable an improvement in prisoner rehabilitation outcomes; and, during its construction, deliver local community benefits.","themes":["Commercial & supply chain","Delivery & schedule"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 is Amber. This is primarily due to the following factors. This is thefirst timedata has been published for this project, which has been added to GMPP over the last year.The Amber assessment is due to inherent risk in the project's timelines. . Exempt under Section 43 of…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"MOJ_0144_2223-Q2","year":2024,"name":"Small Secure Houseblocks","department":"MOJ","category":"Infrastructure and Construction","description":"The Small Secure Houseblock project supports our 20,000 additional prison places commitment; its scope is to create units that will provide secure, permanent accommodation within the closed estate. The project provides a new style of accommodation for deployment in existing prison sites. Small Secure Houseblock units meet the technical needs and security standards required for Category C prisons.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. Challenging site conditions.","startDate":"2021-11-15","endDate":null,"scheduleNarrative":"Exempt under Section 22 of the Freedom of Information Act 2000 (Information intended for future publication)","fyBaseline":125.4,"fyForecast":22.08,"fyVariance":-82.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The underspend is due to schedule delays following complexities with delivering a first-generation design and challenging site conditions.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":0.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 0m. This project currently reports no monetised benefits. Due to the projected increasing prisons population, this project focusses on increasing capacity and there are no monetised benefits to be claimed. The programme's other benefits are defined in the current baseline as: construction benefits and outcomes (capacity, modern methods of construction and sustainability); to enable an improvement in prisoner rehabilitation outcomes; and, during its construction, deliver local community benefits.","themes":["Commercial & supply chain","Cost & funding","Delivery & schedule","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. Challenging site conditions. Exempt under Section 22 of the Freedom of Information Act 2000 (Information intended for future publication)","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"MOJ_0144_2223-Q2","year":2025,"name":"Small Secure Houseblocks","department":"MoJ","category":"Infrastructure and Construction","description":"The Small Secure Houseblock project supports our 20,000 additional prison places commitment; its scope is to create units that will provide secure, permanent accommodation within the closed estate. The project provides a new style of accommodation for deployment in existing prison sites. Small Secure Houseblock units meet the technical needs and security standards required for Category C prisons.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 decreased from AMBER to RED. This is primarily due to the following factors‚ Challenges with construction costs affecting the deliverability of the programme that require further review.","startDate":"2021-11-15","endDate":"2027-12-16","scheduleNarrative":"The project's end-date at 24/25-Q4 is scheduled to be 16/12/2027. This is primarily due to the following factors‚ Delays as a result of changes to programme scope.","fyBaseline":146.86,"fyForecast":153.2,"fyVariance":4.32,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ This project currently reports no monetised benefits. Due to the projected increasing prisons population, this project focusses on increasing capacity and there are no monetised benefits to be claimed. The programme's other benefits are defined in the current baseline as: construction benefits and outcomes (capacity, modern methods of construction and sustainability); to enable an improvement in prisoner rehabilitation outcomes; and, during its construction, deliver local community benefits.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 decreased from AMBER to RED. This is primarily due to the following factors‚ Challenges with construction costs affecting the deliverability of the programme that require further review. The project's end-date at 24/25-Q4 is…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"MOJ_0144_2223-Q2","year":2026,"name":"Small Secure Houseblocks","department":"MOJ","category":"Infrastructure and Construction","description":"The Small Secure Houseblock project supports our 20,000 additional prison places commitment; its scope is to create units that will provide secure, permanent accommodation within the closed estate. The project provides a new style of accommodation for deployment in existing prison sites. Small Secure Houseblock units meet the technical needs and security standards required for Category C prisons.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25-Q4, the NISTA Delivery Confidence Assessment (DCA) has increased from Red to Amber. This is primarily due to improved time confidence following receipt of post-construction mobilisation plans.","startDate":"2021-11-15","endDate":"2028-10-27","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end date at 25/26-Q4 changed from 16/12/27 to 27/10/28. This is primarily due to changes in project scope resulting in amendment of the project timeline.","fyBaseline":489.45,"fyForecast":341.51,"fyVariance":30.23,"varianceNarrative":"Compared to financial year 2024/25‑Q4, the in‑year forecast for 25/26 shows an underspend against the baseline. The underspend is due to reduce in-year activities, requiring costs to be re-profiled into future years.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"This project currently reports no monetised benefits. Due to the projected increasing prisons population, this project focusses on increasing capacity and there are no monetised benefits to be claimed. The project's other benefits are defined in the current baseline as: construction benefits and outcomes (capacity, modern methods of construction and sustainability); to enable an improvement in prisoner rehabilitation outcomes; and, during its construction, deliver local community benefits.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 24/25-Q4, the NISTA Delivery Confidence Assessment (DCA) has increased from Red to Amber. This is primarily due to improved time confidence following receipt of post-construction mobilisation plans. Compared to financial year 24/25-Q4, the project's end date at 25/26-Q4 changed from 16/12/27 to 27/10/28. This is primarily due to…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"MOJ_0144_2223-Q2","year":2025,"name":"Small Secure Houseblocks","department":"MoJ","category":"Infrastructure and Construction","description":"The Small Secure Houseblock project supports our 20,000 additional prison places commitment; its scope is to create units that will provide secure, permanent accommodation within the closed estate. The project provides a new style of accommodation for deployment in existing prison sites. Small Secure Houseblock units meet the technical needs and security standards required for Category C prisons.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 decreased from AMBER to RED. This is primarily due to the following factors‚ Challenges with construction costs affecting the deliverability of the programme that require further review.","startDate":"2021-11-15","endDate":"2027-12-16","scheduleNarrative":"The project's end-date at 24/25-Q4 is scheduled to be 16/12/2027. This is primarily due to the following factors‚ Delays as a result of changes to programme scope.","fyBaseline":146.86,"fyForecast":153.2,"fyVariance":4.32,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ This project currently reports no monetised benefits. Due to the projected increasing prisons population, this project focusses on increasing capacity and there are no monetised benefits to be claimed. The programme's other benefits are defined in the current baseline as: construction benefits and outcomes (capacity, modern methods of construction and sustainability); to enable an improvement in prisoner rehabilitation outcomes; and, during its construction, deliver local community benefits.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 decreased from AMBER to RED. This is primarily due to the following factors‚ Challenges with construction costs affecting the deliverability of the programme that require further review. The project's end-date at 24/25-Q4 is…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":-1,"transition":"Improved","endDateDeltaDays":316,"attentionScore":46,"attentionReasons":["Current published delivery confidence is Amber","Published end date moved 316 days later","In-year forecast variance is +30.2%"]},{"id":"MOD_0479_2425-Q4","year":2026,"name":"FUTURE AIR DOMINANCE SYSTEM","department":"MOD","category":"Military Capability","description":"Future Air Dominance System (FADS) is the Royal Navy’s contribution to Integrated Air and Missile Defence and long-range precision strike, supporting the UK’s Integrated Force across all theatres, including Homeland Defence. Operating within its approved Concept Phase, FADS is being developed as a system-of-systems that integrates sensing, decision-making, and effect capability delivery across a mixed crewed and uncrewed force. Following the Strategic Defence Review, the programme has aligned to the Hybrid Navy vision, prioritising affordability, autonomy and early operational relevance. This includes advancing next-generation radar sensing, force-level command and control, and new approaches to uncrewed and distributed capability, supported by open digital architectures and close collaboration with industry and international partners.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"The Project's Delivery Confidence Assessment rating at 25/26-Q4 is Red. This is primarily due to the following factors. 1. Over the past year, the programme has evolved to align with updated strategic direction, including the Hybrid Navy concept, and has adjusted its approach to emphasise affordability, adaptability and early operational relevance. This transition has required a refresh of assumptions and a focus on building the evidence needed to inform future decisions. 2. At the same time, the programme continues to operate within its approved Concept Phase funding, with future scope and phasing dependent on wider Defence Investment Plan outcomes. As a result, the programme is prioritising experimentation, de-risking and collaboration with industry and partners to mature options ahead of future approvals. 3. Delivery Confidence therefore reflects the programme’s current emphasis on evidence generation and strategic alignment, rather than long term delivery.","startDate":"2022-01-03","endDate":"2045-08-03","scheduleNarrative":"The programme's end-date at 25/26-Q4 remains undetermined. This is primarily due to the following factors. 1. Over the past year, the FADS programme schedule has remained deliberately flexible as the programme continues to operate within its approved Concept Phase. During this period, activity has been focused on shaping future options, testing assumptions, and preparing the programme to respond to forthcoming strategic and investment decisions, rather than progressing against a fixed delivery endpoint. 2. As future scope and phasing will be determined through wider Defence planning processes, a definitive programme end date has not yet been established. In the interim, the schedule reflects an approach that prioritises readiness for decision making, including option development, engagement with partners, and the maturation of enabling activities required to support future approvals. 3. The current schedule position therefore reflects the programme’s role in informing next steps, rather than a change to an agreed end state timeline.","fyBaseline":28.77,"fyForecast":19.93,"fyVariance":30.71,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. 1. The re‑profiling of programme activity following the Hybrid Navy pivot. Planned work was deliberately paused or re‑sequenced resulting in lower in‑year committed expenditure. 2. A proportion of the planned spend has therefore been held as un-committed and will be reallocated to align with the revised scope and delivery approach.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"The project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Delivery & schedule","Cost & funding","Scope & requirements","Commercial & supply chain"],"evidenceExcerpt":"The Project's Delivery Confidence Assessment rating at 25/26-Q4 is Red. This is primarily due to the following factors. 1. Over the past year, the programme has evolved to align with updated strategic direction, including the Hybrid Navy concept, and has adjusted its approach to emphasise affordability, adaptability and early operational relevance. This…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"MOD_0479_2425-Q4","year":2026,"name":"FUTURE AIR DOMINANCE SYSTEM","department":"MOD","category":"Military Capability","description":"Future Air Dominance System (FADS) is the Royal Navy’s contribution to Integrated Air and Missile Defence and long-range precision strike, supporting the UK’s Integrated Force across all theatres, including Homeland Defence. Operating within its approved Concept Phase, FADS is being developed as a system-of-systems that integrates sensing, decision-making, and effect capability delivery across a mixed crewed and uncrewed force. Following the Strategic Defence Review, the programme has aligned to the Hybrid Navy vision, prioritising affordability, autonomy and early operational relevance. This includes advancing next-generation radar sensing, force-level command and control, and new approaches to uncrewed and distributed capability, supported by open digital architectures and close collaboration with industry and international partners.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"The Project's Delivery Confidence Assessment rating at 25/26-Q4 is Red. This is primarily due to the following factors. 1. Over the past year, the programme has evolved to align with updated strategic direction, including the Hybrid Navy concept, and has adjusted its approach to emphasise affordability, adaptability and early operational relevance. This transition has required a refresh of assumptions and a focus on building the evidence needed to inform future decisions. 2. At the same time, the programme continues to operate within its approved Concept Phase funding, with future scope and phasing dependent on wider Defence Investment Plan outcomes. As a result, the programme is prioritising experimentation, de-risking and collaboration with industry and partners to mature options ahead of future approvals. 3. Delivery Confidence therefore reflects the programme’s current emphasis on evidence generation and strategic alignment, rather than long term delivery.","startDate":"2022-01-03","endDate":"2045-08-03","scheduleNarrative":"The programme's end-date at 25/26-Q4 remains undetermined. This is primarily due to the following factors. 1. Over the past year, the FADS programme schedule has remained deliberately flexible as the programme continues to operate within its approved Concept Phase. During this period, activity has been focused on shaping future options, testing assumptions, and preparing the programme to respond to forthcoming strategic and investment decisions, rather than progressing against a fixed delivery endpoint. 2. As future scope and phasing will be determined through wider Defence planning processes, a definitive programme end date has not yet been established. In the interim, the schedule reflects an approach that prioritises readiness for decision making, including option development, engagement with partners, and the maturation of enabling activities required to support future approvals. 3. The current schedule position therefore reflects the programme’s role in informing next steps, rather than a change to an agreed end state timeline.","fyBaseline":28.77,"fyForecast":19.93,"fyVariance":30.71,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. 1. The re‑profiling of programme activity following the Hybrid Navy pivot. Planned work was deliberately paused or re‑sequenced resulting in lower in‑year committed expenditure. 2. A proportion of the planned spend has therefore been held as un-committed and will be reallocated to align with the revised scope and delivery approach.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"The project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Delivery & schedule","Cost & funding","Scope & requirements","Commercial & supply chain"],"evidenceExcerpt":"The Project's Delivery Confidence Assessment rating at 25/26-Q4 is Red. This is primarily due to the following factors. 1. Over the past year, the programme has evolved to align with updated strategic direction, including the Hybrid Navy concept, and has adjusted its approach to emphasise affordability, adaptability and early operational relevance. This…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":null,"ratingDelta":null,"transition":"Not comparable","endDateDeltaDays":null,"attentionScore":45,"attentionReasons":["Current published delivery confidence is Red","In-year forecast variance is +30.7%"]},{"id":"HO_0036_1617-Q2","year":2026,"name":"Law Enforcement Data Service","department":"HO","category":"Information and Communications Technology (ICT)","description":"The Law Enforcement Data Service (LEDS) is replacing the legacy Police National Computer (PNC) with a modern, secure and scalable data platform for policing and wider law enforcement agencies. LEDS is designed to provide continuity of core functionality while introducing enhanced capabilities, including image sharing, geo‑location data and automated alerts, enabling more effective access to and use of information across law enforcement. The PNC, which has been in operation for several decades, underpins critical policing activities, including arrests, traffic enforcement and safeguarding interventions. However, as an ageing system originally designed for an earlier technological environment, it is increasingly complex and costly to maintain and is less able to meet evolving operational and security requirements. LEDS provides a platform that supports more integrated, intelligence‑led policing and is designed to evolve over time in line with operational needs. By transitioning from legacy infrastructure to a modern data service, the programme aims to improve system resilience, data accessibility and the ability to respond effectively to emerging threats.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Amber delivery confidence assessment remains appropriate, reflecting continued progress in delivering the Law Enforcement Data Service (LEDS) and ongoing commitment to its modernisation objectives. While challenges remain, the programme is making measurable progress against its delivery plan, and successful delivery to agreed time and cost remains achievable in line with the approved business case.","startDate":"2014-04-01","endDate":"2026-12-31","scheduleNarrative":"The programme delivery schedule has been extended to enable Final Endpoint Switchover (FES) by September 2026 and programme closure by December 2026. This extension, along with the underpinning delivery milestones, was outlined in the updated programme business case, which was approved by InvestCo (Investment Committee) on 18 December 2025.","fyBaseline":218.33,"fyForecast":141.52,"fyVariance":35.18,"varianceNarrative":"The budget variance is less than or equal to 5 (4.6%) at the end of Q4, and remains within agreed tolerances. The reported 35% variance in the table reflects a comparison between the approved business case baseline (which includes Optimism Bias) and actual expenditure (which excludes Optimism Bias).","wholeLifeCost":1086.68,"costNarrative":"In year forecast of £146.11m vs a funding allocation of £139.71m represents a 4.6% increase/variance. This increase is due to bringing forward work identified in Persons, Vehicles and SRG for FY26/27 into FY25/26.","benefits":396.81,"benefitsNarrative":"Compared to financial year 24/25 Q4, the projects departmentally agreed benefits at 24/25 Q4 (measured in £m) decreased from £458.895m to £457.837m. This is primarily due to £1.06m of benefits moving from forecast benefit to realised.","themes":["Delivery & schedule","Cost & funding","Approvals & decisions","Technical & integration"],"evidenceExcerpt":"The Amber delivery confidence assessment remains appropriate, reflecting continued progress in delivering the Law Enforcement Data Service (LEDS) and ongoing commitment to its modernisation objectives. While challenges remain, the programme is making measurable progress against its delivery plan, and successful delivery to agreed time and cost remains…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"HO_0036_1617-Q2","year":2020,"name":"National Law Enforcement Data Programme (NLEDP)","department":"HO","category":"ICT","description":"Will replace the current Police National Computer (PNC) and Police National Database (PND) systems with one modernised solution.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber/Red, which has not changed since last year�s Q2 1819 Amber/Red, due primarily to the following factors; - An independent review in January 2019 found significant progress since the last review, however, As in 2018, the long term funding position remains unclear and some smoothing was likely to be necessary in the shorter term too. - As at Q2 2019/20, there was a continued risk that police forces and Law Enforcement Agencies would not transition to LEDS (Law Enforcement Data System) in line with the programme plan. Since the Q2 1920 (30th September 2019) Amber/Red IPA DCA, the following non-project operating environment activities have impacted the original Q2 IPA DCA; - External dependencies with the Home Office operating environment are not ready for NLEDP to consume or onboard. The team has therefore determined to build all its own services, where necessary, to meet delivery timescales. - Availability of staff due to EU Exit activities and ability to gain the relevant security clearances has affected onboarding. In addition, dependencies on external live services resources to meet Programme timescales has affected milestone dates. Since the Q2 1920 (30th September 2019) Amber/Red IPA DCA, the following primary project actions have impacted the original Q2 IPA DCA; - The Programme achieved a confidence rating of Amber from an independent review that took place in November 2019. - The Programme has developed a staged transition approach for the introduction of the LEDS into operational use. It has been assessed as making more likely successful LEDS delivery by building stakeholder confidence through the delivery of incrementally enhanced services to Law Enforcement in a controlled way across targeted stakeholder groups. - The Programme has ensured that its procurement approach protects the Home Office should the future additional funding to deliver the PND (Police National Database) element not be secured.","startDate":"2014-04-01","endDate":"2023-03-31","scheduleNarrative":"The scheduled baseline project end date at Q2 1920 (30th September 2019) is 31/03/23, has lengthened by 1095 days since last year's Q2 1819 date of 31/03/20, due primarily to the following factors; - The 18/19 Programme forecast was unaffordable but also the technical complexity of the new platform meant the deadline would not have been achievable. The programme re-planned to derisk delivery, focusing first on PNC (Police National Computer) delivery and restricting expenditure to the existing Portfolio allocation, phasing delivery of PNC and PND replacement sequentially, not in parallel, as presented in the 2019 Business Case. - Increasingly detailed analysis of PNC and PND resulted in greater estimating certainty for the full requirements of the replacement system; Programme forecasted build costs increased. This precipitated the re-planning, and the longer time-frame. Since the Q2 1920 (30th September 2019) baseline project end date of 31/03/23, the following non-project operating environment activities have impacted the original Q2 baseline project end date; - External dependencies within the Home Office operating environment are not ready for NLEDP to consume or onboard to, due to maturity and prioritisation of critical Live Services over change programmes. Therefore the Programme is building all its own services, where necessary, to meet delivery timescales. - Availability of staff due to EU Exit activities and ability to gain the relevant security clearances has affected onboarding. In addition, dependencies on external live services resources to meet Programme timescales has affected milestone dates. Since the Q2 1920 (30th September 2019) baseline project end date of 31/03/23, the following primary project actions have impacted the original Q2 baseline project end date; - NLEDP has undergone a programme reset. In-depth planning work determined that the previous baseline was not feasible given the Programme�s complexity. Consequently, the Programme�s plan, business case, and cost model are being re-baselined ensuring affordability within the Portfolio's budget allocation. - NLEDP has moved from delivering PND and PNC replacement simultaneously to an incremental delivery approach, with phased transition for PNC, delivering early capabilities to controlled user groups and offering earlier benefits for specific stakeholders. This de-risks the programme and makes it more affordable, but stretches the project end date. - There is no change to the business scope, however, implementation scope will change in line with the phased transition plan.","fyBaseline":67.5,"fyForecast":87.43,"fyVariance":30.0,"varianceNarrative":"The 19/20 in-year baseline / forecast variance at Q2 1920 (30th September 2019) of 30%, is due primarily to the following factors; - The Q2 2019/20 figure reflects the in year position within 2019 Programme Business Case (PBC) which has been approved by the Home Office's investment committee, but is awaiting from HMT approval. The latest costs from that case are presented here with cost comparison were from the 2017 business case. There has been significant change in the Programme since then. - Additional items were part of Programme scope; security controls, Police Cloud Gateway, a new identity and access management solution, a solution to interface with older systems and specific requirements to handle more sensitive data and additional costs identified with data migration, external interfaces, test and the core Programme team's extension. - The 2019 PBC has made the Programme affordable year-on-year, with a longer delivery timeframe and increased costs. This forecast includes an additional year of run costs due to extension of appraisal period (2031/32), accommodating the delay to the start of the asset's life following replanning, giving an artificially higher total cost. Since the Q2 1920 (30th September 2019) 19/20 in-year baseline / forecast variance of 30%, the following primary project actions have impacted the original Q2 19/20 in-year variance; - Since Q2 re-baselining of the cost model was heavily focused around the Law Enforcement Portfolio's budget allocation for the Programme, as a result 2019/20 forecasts have reduced.","wholeLifeCost":469.4,"costNarrative":"The baseline Whole Life Cost at Q2 1920 (30th September 2019) is �469.40 m, has not changed since last year's Q2 1819 (�m) baseline Whole Life Cost of �469.40 m, due primarily to the following factors; - Both figures represent the baseline from the latest approved business case at that point in time. Since the Q2 1920 (30th September 2019) �469.40 m baseline Whole Life Cost, the following non-project operating environment activities have impacted the original baseline Q2 Whole Life Cost; - Additional programme activities originally planned to be provided by Home Office DDaT. Limited availability of civil servant resources, increased dependency on supplier resource. - Provision of all infrastructure and operating environments by the Programme. Since the Q2 1920 (30th September 2019) �469.40 m baseline Whole Life Cost, the following primary project actions have impacted the original Q2 baseline Whole Life Cost; - Programme WLC for 2019/20 PBC are �492.57 which is an increase over the figure reported. This is due to elongation of programme plan and increased build cost complexity. - Continued provision of all infrastructure and operating environments by the Programme.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Technical & integration"],"evidenceExcerpt":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber/Red, which has not changed since last year�s Q2 1819 Amber/Red, due primarily to the following factors; - An independent review in January 2019 found significant progress since the last review, however, As in 2018, the long term funding position remains unclear…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2020","sourceLabel":"IPA Annual Report 2019-20"},{"id":"HO_0036_1617-Q2","year":2021,"name":"National Law Enforcement Data Programme (NLEDP)","department":"HO","category":"ICT","description":"The National Law Enforcement Data Programme (NLEDP) is delivering an enhanced Law Enforcement Data Service (LEDS) that will be at the heart of protecting the public for years to come.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating increased from Amber/Red to Red. This is primarily due to the following factors: The programme went into a reset following the outcome of an independent review in December 2020 which laid out that the programme faced multiple challenges and constraints in the way it had been delivering, and that if it continued, the programme would not be able to deliver the LEDS capability that is urgently required by policing. The programme is coming out of reset at the end of July 2021. The three main risks to the programme are force engagement and adoption, the strategic platform decision, and the need to ensure two-way replication of data. To mitigate the risk of delayed delivery, the programme is considering options to ensure the continued operation of the current Police National Computer system beyond 2025.","startDate":"2014-04-01","endDate":"2023-03-31","scheduleNarrative":"Compared to financial year 19/20-Q2, the project's end-date remained scheduled to finish on 31 March 2023 . This is primarily due to the following factors: The programme is currently undergoing a reset and a revised programme end date will be agreed once this process has been concluded. The current focus is on delivering the property product as a proof of concept for subsequent products delivery.","fyBaseline":86.55,"fyForecast":75.02,"fyVariance":-13.0,"varianceNarrative":"The budget variance exceeds 5%. The presented baseline is from the approved 2019 business case and there has been significant change in the Programme since then. During the reset headcount on the programme has been reduced to ensure value for money and mitigate any nugatory costs. As a result the 2020/21 costs have reduced.","wholeLifeCost":631.09,"costNarrative":"Compared to financial year 19/20-Q2, the projects Baseline Whole Life Cost increased from �469.40m to �631.09m. This is primarily due to the following factors: Programme Whole Life Costs will be updated as part of the programme reset.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Scope & requirements","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating increased from Amber/Red to Red. This is primarily due to the following factors: The programme went into a reset following the outcome of an independent review in December 2020 which laid out that the programme faced multiple challenges and…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21"},{"id":"HO_0036_1617-Q2","year":2022,"name":"National Law Enforcement Data Programme (NLEDP)","department":"HO","category":"ICT","description":"The National Law Enforcement Data Programme (NLEDP) is delivering an enhanced Law Enforcement Data Service that will be at the heart of protecting the public for years to come, aiming to replace the current Police National Computer in advance of December 2025.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 decreased from Red to Amber. Programme has made significant progress in building stakeholder confidence and ramping up delivery velocity during the pathfinder phase. Main risks to the programme now is driving forces adoption of Law Enforcement Data Service products and building the production instance of the 2-way replication capability enabling both Police National Computer and NLEDP platforms to operate in parallel during NLEDP delivery and adoption phases. The programme continues to focus on proactively managing these risks. Photos at the Roadside Service successfully delivered to 32 police forces. The programme is on schedule to deliver next product iterations: Property, Drivers and supporting Audit functionality by March 2022. Vehicles Team are currently delivering Discovery phase. Recruitment for the Person product acceleration is underway. This team is currently delivering Alpha for the Wanted Persons Product and is building the 2-way replication production service. 2-way replication is a pre-requisite for the Vehicle and Person teams.","startDate":"2014-04-01","endDate":"2025-12-31","scheduleNarrative":"Compared to 2021-Q4, your project end-date increased from 31 MAR 2023 to 31 DEC 2025 . This is primarily due to the following factors: The programme has completed reset and the revised end date of the 31/12/2025 was agreed as part of the business case approved in July 2021 in order to complete the required delivery and adoption activities to replace the Police National Computer before the end-of-life of December 2025. NLEDP has moved to a product-centric approach with continuous, user-centred product delivery, a proven approach to de-risk a complex critical national infrastructure programme. The programme has successfully delivered the Property Search, Driver Check and associated Audit capabilities and has proven the 2-Way Replication Capability as committed on 31st March 2022.","fyBaseline":33.98,"fyForecast":33.98,"fyVariance":0.0,"varianceNarrative":"The budget variance is inferior or equal to 5%.","wholeLifeCost":736.0,"costNarrative":"Compared to2021-Q4, the projects Baseline Whole Life Cost increased from 631.09 (£m) to 735.58 (£m). This is primarily due to the following factors: The figures presented are from the latest business case which received Finance and Investment Committee approval in February 2022. The previous business case (2019) was approved prior to the December 2020 reset. That business case fundamentally differed in that it looked at the sequential replacement of both the Police National Computer and then the Police National Database, with a funding requirement of circa £155M, and is based on a waterfall delivery approach. The recent National Audit Office report assisted in demonstrating that this 2019 business case was not realistic in its understanding of the cost requirements or of the optimism bias percentage that was used (with the programme vastly understating its risk and uncertainty in cost/percentage terms). The latest business case adopts an agile approach to delivery and is solely focused on the replacement of the Police National Computer capabilities. The current business case made a funding request for circa £207M with an optimism bias allocation of £154M.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 decreased from Red to Amber. Programme has made significant progress in building stakeholder confidence and ramping up delivery velocity during the pathfinder phase. Main risks to the programme now is driving forces adoption of Law…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"HO_0036_1617-Q2","year":2023,"name":"National Law Enforcement Data Programme (NLEDP)","department":"HO","category":"ICT","description":"With the expansion of the National Law Enforcement Data Portfolio (NLEDP) we are now known as the Law Enforcement Data Service (LEDS) programme. The LEDS Programme is delivering a replacement to the current Police National Computer (PNC) service which will facilitate a range of future transformational capability and functionality that will be at the heart of protecting the public for years to come, aiming to replace the current PNC to enable retirement on PNC by March 2026.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. The programme leadership is strengthened by the appointment of a permanent, highly experienced Programme Director and new Senior Responsible Owner who brings a wealth of experience from a Policing background. The programme remains large and complex with areas of significant risk which are closely managed and monitored.Stakeholder relationships between Policing and the programme are very strong, with evidence of effective integrated joint working and ownership at the Force level. Adoption is well advanced with five key products rolled out and others in development.There is confidence that the programme is now in a position to successfully deliver a PNC equivalence, or better, by March 2026. It is appropriate that the programme now starts to focus on the complex choreography of moving away from PNC and, in parallel, work up the full transformation vision for a law enforcement data capability that will service a vast array of customers.","startDate":"2014-04-01","endDate":"2025-12-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2025-12-31. This is primarily due to the following factors. The programme has completed reset, the revised end date of the 31/12/2025 was agreed as part of the business case approved in July 2021 to complete the required delivery and adoption activities to replace PNC before it ceases to operate on 01/04/2026. LEDS has moved to a product-centric delivery approach with continuous, user-centred product delivery, a proven approach to de-risk a complex critical national infrastructure programme.The programme successfully released Photos at the Road Side(P@RS), Property, Drivers, Vehicles products to users underpinned by Audit capability all via the strategic Law Enforcement Cloud Platform(LECP). Property will be fully transitioned from PNC later this year with Drivers and Vehicles searches reaching Public Beta around the same time. 2-Way Replication has been demonstrated successfully but needs to be coupled with a LEDS product functionality to give more confidence in its capability, anticipated to be in place through Wanted Person capability later this year.","fyBaseline":63.74,"fyForecast":55.39,"fyVariance":-13.0,"varianceNarrative":"The budget variance exceeds 5%. The variance (c8.5million) arose due to 3 main factors. 1. The Programme received a VAT 'credit' against the accruals for prior Financial Years of c3million. 2. Procedural issues arose with regards to certain elements of the forecasted Adoption Grant; this resulted in a c3.5million underspend. 3. Whilst the programme resources have increased considerably (from 139 Fixed Term Employees last report to 293 Fixed Term Employees this report) the projection was for a slightly higher number of resources to be on the Programme by end of year, due to delays in onboarding. This reduction in resources cause a c2million underspend.","wholeLifeCost":602.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 decreased from 736m. to 602m. This is primarily due to the following factors. The Baseline Whole Life Cost (WLC) in the previous report (c736million) was based on the Programme pre-reset; this pre-reset WLC was also far greater than the forecast in the previous report (based on actuals and future forecast) of c589million. This report has updated the baseline from the pre-reset to the post-reset baseline hence the reduction. When we compare the forecast in the previous report (c589million) to the current forecast (c602million) there is a c13million increase which is due to the Programme having a greater understanding of the requirements (against assumptions) and certain roles which were not in the previous report (e.g. enhanced Security and Engineering & Architecture teams) which has resulted in the increase.","benefits":523.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 523m. The project's departmental-agree monetised benefits at 22/23-Q4 is 523m. The total benefits baseline has increased from 520.96 (million) to 523.35 (million). This is because of an improved forecasting methodology which has led to reapportionment of benefits. This has meant that there has been an increase in Government non cash-releasing benefits and wider UK public benefits as well as a decrease in government cash releasing benefits and the introduction of dis-benefits. The dis-benefits arise from officers needing to be trained to use both the old and the new system while both systems are being dual run.","themes":["Cost & funding","Delivery & schedule","Scope & requirements","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. The programme leadership is strengthened by the appointment of a permanent, highly experienced Programme Director and new Senior Responsible Owner who brings a wealth…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"HO_0036_1617-Q2","year":2024,"name":"Law Enforcement Data Service","department":"HO","category":"ICT","description":"The Law Enforcement Data Service (LEDS) Programme is delivering a replacement to the current Police National Computer (PNC) service, which will facilliate a range of future transforamtion capability and functionality that will be at the heart of protecting the public for years to come, to enable retirement of PNC by March 2026.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. Delivery confidence based upon the continued positive progress towards product development and adoption since the last IPA Review remains high. PNC parity has been achieved for LEDS Property, Drivers and Vehicles Enquiry products, and development of the LEDS Person product has commenced. All five LEDS products are now live across 56 forces._x000D_ However, conclusion of LEDS development and adoption to enable retirement of PNC by March 26 remains challenging. LEDS continues to manage significant risk and dependencies owing to:_x000D_ 1. Complexity in development: multi-system integration across Police Forces, other LEDS consumers and data providers; new cloud platform hosting capabilities and migration from legacy technology._x000D_ 2. A broad, varied and demanding stakeholder community of 56 forces and 140 non-policing organisations_x000D_ 3. Growing financial and resourcing pressures_x000D_ These risks and dependencies are transparent and well-managed, with appropriate remediation plans and management attention. With these interventions, delivery within budget and time remains feasible.","startDate":"2014-04-01","endDate":"2026-03-31","scheduleNarrative":"The project's end-date at 23/24-Q4 is 2026-03-31. This is primarily due to the following factors. Programme is on track to close March 2026.","fyBaseline":85.03,"fyForecast":85.33,"fyVariance":0.0,"varianceNarrative":"The budget variance is inferior or equal to 5%.","wholeLifeCost":611.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 23/24-Q4 is 611m. This is primarily due to the following factors. There has only been minor movements of the Baseline Whole Life Cost from 2223-Q4 which is primarily due to: Increase in resource requirements forecast over the remaining programme timeframe, and the discovery work ongoing for the Person and External Integration areas, which is large and complex.","benefits":411.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 411m. Person Product Team contributes 72% of the benefits (320 m). The remaining benefits are derived from Driver's Product Team (3 m), Property Product Team (0.6 m), Vehicle Product Team (15 m), User Channels Product Team (9 m), Training Product Team (58 m) and Cross Product Team (10 m). Benefits from Audit Product Team and NSS Tools Product Team have not been monetised at this current stage","themes":["Cost & funding","Technical & integration","Delivery & schedule","Workforce & capability"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. Delivery confidence based upon the continued positive progress towards product development and adoption since the last IPA Review remains high. PNC parity has been achieved for LEDS Property, Drivers and Vehicles…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"HO_0036_1617-Q2","year":2025,"name":"Law Enforcement Data Service","department":"HO","category":"ICT","description":"Law Enforcement Data Service (LEDS) Programme is a mature enabling programme, and a product-centric initiative that is replacing the end-of-life Police National Computer (PNC) with a modern, secure, and scalable platform. LEDS is critical national infrastructure that directly supports frontline policing and wider government priorities. LEDS is providing modern products, which can evolve over time to better meet the operational needs of law enforcement, as well as strong links, supporting Government priorities, including crime reduction, Violence against Women and Girls, and Serious Organised Crime (SOC). LEDS programme will incrementally deliver products that provide functional equivalence (parity) to PNC. It is delivering a suite of modern, cloud-based products that provide a unified view of law enforcement data, improve operational effectiveness, and enable future innovation. All products will be traced back to PNC data transactions to ensure parity with PNC is reached. Parity, in this context, means the minimum service required to support business continuity and ensure adoption, eventually allowing PNC to be retired. The programme is already delivering value through phased rollouts, with five products live across police forces and non-law enforcement agencies. The programme is on track to remove the dependency on PNC by March 2026.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. Delivery confidence has significantly improved since the 2021 reset, with the move to a product centric, agile development approach, the strengthening of the leadership team, and the successful product deployments and adoption. However, this programme remains large, complex and high risk. As the programme progresses through further phases of development the complexity and risk continue to pose a risk to plan and budget, this is fully recognised and being managed. Whist, March 2026 remains achievable, ongoing planning and funding pressures continue to present material risks. We are actively addressing these through targeted mitigation strategies, with regular oversight by the programme board. Despite a complex delivery environment, we are consistently achieving key milestones across the remaining LEDS Products and Enablers. Minor releases are being deployed effectively, ensuring that all live services remain stable and aligned with operational requirements. Strong collaboration with Forces and key stakeholders continues to be a priority. This engagement is critical to overcoming adoption challenges and ensuring the successful integration of new capabilities across the operational landscape. This is supported by IPA reviews which highlighted a high level of confidence in LEDS delivery, but noted continued complexity and risk associated with the development and adoption of this critical national infrastructure.","startDate":"2014-04-01","endDate":"2026-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2026. This is primarily due to the following factors. Despite the programme’s continued progress in a complex delivery environment, key milestones across the remaining LEDS Products and Enablers are being consistently achieved. This is underpinned by robust assurance practices that actively manage programme plans and mitigate risks. Minor releases are being deployed effectively, ensuring that all live services remain stable and aligned with operational requirements. Strong collaboration with police forces and key stakeholders remains a cornerstone of our delivery approach. This engagement is critical to overcoming adoption challenges and ensuring the successful integration of new capabilities across the operational landscape. The programme recognises the importance of maintaining resilience in support of critical national infrastructure and in parallel has commenced discussion to extend the PNC as contingency. To this end, commercial teams are actively exploring contingency options, including the potential extension of PNC support contracts. These considerations are being factored into a forthcoming programme decision point and will be progressed through formal governance channels.","fyBaseline":187.12,"fyForecast":123.39,"fyVariance":34.06,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. This variance reflects a more complete and mature understanding of delivery requirements and associated risks. These changes reflect the evolving complexity and scale of the programme, ensuring it remains fit for purpose and resilient in delivering critical national infrastructure. Key drivers include: • New cost responsibilities, such as funding external interfaces for wider Home Office use. • Emerging complexities in delivery, particularly from discovery work on products Person and EI components. • Increased resource needs, including roles not originally forecasted. • Expanded support and security requirements, including service support and architectural input. • VAT reallocation, where some costs are now recognised as non-recoverable. • Rising technical delivery costs, such as Supplier contract uplifts.","wholeLifeCost":905.07,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 611 to 905. This is primarily due to the following factors. This uplift reflects a more complete and mature understanding of delivery requirements and associated risks. These changes reflect the evolving complexity and scale of the programme, ensuring it remains fit for purpose and resilient in delivering critical national infrastructure. Key drivers include: • New cost responsibilities, such as funding external interfaces for wider Home Office use. • Emerging complexities in delivery, particularly from discovery work on products Person and EI components. • Increased resource needs, including roles not originally forecasted. • Expanded support and security requirements, including service support and architectural input. • VAT reallocation, where some costs are now recognised as non-recoverable. • Rising technical delivery costs, such as Supplier contract uplifts.","benefits":458.9,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 411 to 458. This is primarily due to the following factors‚ This uplift reflects a more complete and mature understanding of products reflecting the evolving complexity and scale of the programme. Benefits from efficiency savings, cost savings and outcome improvements for public and private sector stakeholders have been identified and appraised over a 12-year appraisal period from FY2021/22 to FY2035/36. A benefits-tracking framework and realisation plan has been established to monitor all programme benefits. Key benefits that will be delivered by LEDS include: • Improved safeguarding of missing persons. • Efficiency of missing persons investigations. • Reduced inefficiency from PNC outages. • Reduced time to train new users. • c.£7m lower run cost than PNC","themes":["Delivery & schedule","Cost & funding","Commercial & supply chain","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. Delivery confidence has significantly improved since the 2021 reset, with the move to a product centric, agile development approach, the strengthening of the…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"HO_0036_1617-Q2","year":2026,"name":"Law Enforcement Data Service","department":"HO","category":"Information and Communications Technology (ICT)","description":"The Law Enforcement Data Service (LEDS) is replacing the legacy Police National Computer (PNC) with a modern, secure and scalable data platform for policing and wider law enforcement agencies. LEDS is designed to provide continuity of core functionality while introducing enhanced capabilities, including image sharing, geo‑location data and automated alerts, enabling more effective access to and use of information across law enforcement. The PNC, which has been in operation for several decades, underpins critical policing activities, including arrests, traffic enforcement and safeguarding interventions. However, as an ageing system originally designed for an earlier technological environment, it is increasingly complex and costly to maintain and is less able to meet evolving operational and security requirements. LEDS provides a platform that supports more integrated, intelligence‑led policing and is designed to evolve over time in line with operational needs. By transitioning from legacy infrastructure to a modern data service, the programme aims to improve system resilience, data accessibility and the ability to respond effectively to emerging threats.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Amber delivery confidence assessment remains appropriate, reflecting continued progress in delivering the Law Enforcement Data Service (LEDS) and ongoing commitment to its modernisation objectives. While challenges remain, the programme is making measurable progress against its delivery plan, and successful delivery to agreed time and cost remains achievable in line with the approved business case.","startDate":"2014-04-01","endDate":"2026-12-31","scheduleNarrative":"The programme delivery schedule has been extended to enable Final Endpoint Switchover (FES) by September 2026 and programme closure by December 2026. This extension, along with the underpinning delivery milestones, was outlined in the updated programme business case, which was approved by InvestCo (Investment Committee) on 18 December 2025.","fyBaseline":218.33,"fyForecast":141.52,"fyVariance":35.18,"varianceNarrative":"The budget variance is less than or equal to 5 (4.6%) at the end of Q4, and remains within agreed tolerances. The reported 35% variance in the table reflects a comparison between the approved business case baseline (which includes Optimism Bias) and actual expenditure (which excludes Optimism Bias).","wholeLifeCost":1086.68,"costNarrative":"In year forecast of £146.11m vs a funding allocation of £139.71m represents a 4.6% increase/variance. This increase is due to bringing forward work identified in Persons, Vehicles and SRG for FY26/27 into FY25/26.","benefits":396.81,"benefitsNarrative":"Compared to financial year 24/25 Q4, the projects departmentally agreed benefits at 24/25 Q4 (measured in £m) decreased from £458.895m to £457.837m. This is primarily due to £1.06m of benefits moving from forecast benefit to realised.","themes":["Delivery & schedule","Cost & funding","Approvals & decisions","Technical & integration"],"evidenceExcerpt":"The Amber delivery confidence assessment remains appropriate, reflecting continued progress in delivering the Law Enforcement Data Service (LEDS) and ongoing commitment to its modernisation objectives. While challenges remain, the programme is making measurable progress against its delivery plan, and successful delivery to agreed time and cost remains…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"HO_0036_1617-Q2","year":2025,"name":"Law Enforcement Data Service","department":"HO","category":"ICT","description":"Law Enforcement Data Service (LEDS) Programme is a mature enabling programme, and a product-centric initiative that is replacing the end-of-life Police National Computer (PNC) with a modern, secure, and scalable platform. LEDS is critical national infrastructure that directly supports frontline policing and wider government priorities. LEDS is providing modern products, which can evolve over time to better meet the operational needs of law enforcement, as well as strong links, supporting Government priorities, including crime reduction, Violence against Women and Girls, and Serious Organised Crime (SOC). LEDS programme will incrementally deliver products that provide functional equivalence (parity) to PNC. It is delivering a suite of modern, cloud-based products that provide a unified view of law enforcement data, improve operational effectiveness, and enable future innovation. All products will be traced back to PNC data transactions to ensure parity with PNC is reached. Parity, in this context, means the minimum service required to support business continuity and ensure adoption, eventually allowing PNC to be retired. The programme is already delivering value through phased rollouts, with five products live across police forces and non-law enforcement agencies. The programme is on track to remove the dependency on PNC by March 2026.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. Delivery confidence has significantly improved since the 2021 reset, with the move to a product centric, agile development approach, the strengthening of the leadership team, and the successful product deployments and adoption. However, this programme remains large, complex and high risk. As the programme progresses through further phases of development the complexity and risk continue to pose a risk to plan and budget, this is fully recognised and being managed. Whist, March 2026 remains achievable, ongoing planning and funding pressures continue to present material risks. We are actively addressing these through targeted mitigation strategies, with regular oversight by the programme board. Despite a complex delivery environment, we are consistently achieving key milestones across the remaining LEDS Products and Enablers. Minor releases are being deployed effectively, ensuring that all live services remain stable and aligned with operational requirements. Strong collaboration with Forces and key stakeholders continues to be a priority. This engagement is critical to overcoming adoption challenges and ensuring the successful integration of new capabilities across the operational landscape. This is supported by IPA reviews which highlighted a high level of confidence in LEDS delivery, but noted continued complexity and risk associated with the development and adoption of this critical national infrastructure.","startDate":"2014-04-01","endDate":"2026-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2026. This is primarily due to the following factors. Despite the programme’s continued progress in a complex delivery environment, key milestones across the remaining LEDS Products and Enablers are being consistently achieved. This is underpinned by robust assurance practices that actively manage programme plans and mitigate risks. Minor releases are being deployed effectively, ensuring that all live services remain stable and aligned with operational requirements. Strong collaboration with police forces and key stakeholders remains a cornerstone of our delivery approach. This engagement is critical to overcoming adoption challenges and ensuring the successful integration of new capabilities across the operational landscape. The programme recognises the importance of maintaining resilience in support of critical national infrastructure and in parallel has commenced discussion to extend the PNC as contingency. To this end, commercial teams are actively exploring contingency options, including the potential extension of PNC support contracts. These considerations are being factored into a forthcoming programme decision point and will be progressed through formal governance channels.","fyBaseline":187.12,"fyForecast":123.39,"fyVariance":34.06,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. This variance reflects a more complete and mature understanding of delivery requirements and associated risks. These changes reflect the evolving complexity and scale of the programme, ensuring it remains fit for purpose and resilient in delivering critical national infrastructure. Key drivers include: • New cost responsibilities, such as funding external interfaces for wider Home Office use. • Emerging complexities in delivery, particularly from discovery work on products Person and EI components. • Increased resource needs, including roles not originally forecasted. • Expanded support and security requirements, including service support and architectural input. • VAT reallocation, where some costs are now recognised as non-recoverable. • Rising technical delivery costs, such as Supplier contract uplifts.","wholeLifeCost":905.07,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 611 to 905. This is primarily due to the following factors. This uplift reflects a more complete and mature understanding of delivery requirements and associated risks. These changes reflect the evolving complexity and scale of the programme, ensuring it remains fit for purpose and resilient in delivering critical national infrastructure. Key drivers include: • New cost responsibilities, such as funding external interfaces for wider Home Office use. • Emerging complexities in delivery, particularly from discovery work on products Person and EI components. • Increased resource needs, including roles not originally forecasted. • Expanded support and security requirements, including service support and architectural input. • VAT reallocation, where some costs are now recognised as non-recoverable. • Rising technical delivery costs, such as Supplier contract uplifts.","benefits":458.9,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 411 to 458. This is primarily due to the following factors‚ This uplift reflects a more complete and mature understanding of products reflecting the evolving complexity and scale of the programme. Benefits from efficiency savings, cost savings and outcome improvements for public and private sector stakeholders have been identified and appraised over a 12-year appraisal period from FY2021/22 to FY2035/36. A benefits-tracking framework and realisation plan has been established to monitor all programme benefits. Key benefits that will be delivered by LEDS include: • Improved safeguarding of missing persons. • Efficiency of missing persons investigations. • Reduced inefficiency from PNC outages. • Reduced time to train new users. • c.£7m lower run cost than PNC","themes":["Delivery & schedule","Cost & funding","Commercial & supply chain","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. Delivery confidence has significantly improved since the 2021 reset, with the move to a product centric, agile development approach, the strengthening of the…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":275,"attentionScore":45,"attentionReasons":["Current published delivery confidence is Amber","Published end date moved 275 days later","In-year forecast variance is +35.2%"]},{"id":"MOJ_0053_2021-Q4","year":2026,"name":"Accelerated Houseblocks","department":"MOJ","category":"Infrastructure and Construction","description":"The Accelerated Houseblocks Programme supports our 20,000 additional prison places commitment; its scope is to deliver around 2,400 places.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25-Q4, the NISTA Delivery Confidence Assessment remains at Amber. This is primarily due to inflation and increasing cost maturity resulting in increasing cost estimates and other market risks.","startDate":"2020-09-28","endDate":"2030-11-01","scheduleNarrative":"Compared to financial year 24/25-Q4 the programme’s end date changed from 10/07/28 to 01/11/30. This is primarily due to scope increases within the project resulting in more time required to achieve overall programme completion.","fyBaseline":608.61,"fyForecast":510.79,"fyVariance":16.07,"varianceNarrative":"The budget variance exceeds 5%. This is due to scope and cost rebaselining.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"This programme currently reports no monetised benefits. Due to the projected increasing prison population, this programme focuses on increasing capacity and there are no monetised benefits to be claimed. The programme's other benefits are defined in the current baseline as: construction benefits and outcomes (capacity, modern methods of construction and sustainability); to enable an improvement in prisoner rehabilitation outcomes; and, during its construction, deliver local community benefits.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 24/25-Q4, the NISTA Delivery Confidence Assessment remains at Amber. This is primarily due to inflation and increasing cost maturity resulting in increasing cost estimates and other market risks. Compared to financial year 24/25-Q4 the programme’s end date changed from 10/07/28 to 01/11/30. This is primarily due to scope increases…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"MOJ_0053_2021-Q4","year":2021,"name":"3K Prison Places","department":"MOJ","category":"Infrastructure and Construction","description":"The prison population is forecast is scheduled to rise significantly in the 2020s and the department is bringing forward new prison places to accommodate new offenders. This project is part of the 3,000 Additional Prison Places Programme and will deliver 2,500 Houseblocks places across the adult male estate.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber/red.This is primarily due to the following factors: The project is making good progress with selecting and assessing feasibility of proposed sites but is working to ambitious timelines which is dependent on several factors that are outside of the project's direct control. The need to secure planning permission for the new sites creates a risk of delay, should challenges arise at a local level.","startDate":"2020-09-28","endDate":"2024-05-13","scheduleNarrative":"The project end-date is 13 May 2024. This is primarily due to the following factors: The additional places will be delivered from January 2024, which will reduce the need to implement emergency capacity measures.","fyBaseline":21.52,"fyForecast":4.28,"fyVariance":-80.0,"varianceNarrative":"The budget variance exceeds 5%. The baseline costs are based on an initial set of assumptions about timing and cost. Although the project has made good progress in terms of selecting sites for expansion spend has been slower than anticipated.","wholeLifeCost":12491.43,"costNarrative":"The projects Baseline Whole Life Cost is �12491.43m. This is primarily due to the following factors: The baseline is an initial estimate of the costs of providing 3,000 additional prison places and then operating and maintaining them over their estimated 60 year life. The estimates are at an early stage of development and will be updated as relevant business cases are approved.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Workforce & capability"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber/red.This is primarily due to the following factors: The project is making good progress with selecting and assessing feasibility of proposed sites but is working to ambitious timelines which is dependent on several factors that are outside of the project's direct control.…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21"},{"id":"MOJ_0053_2021-Q4","year":2022,"name":"Accelerated Houseblocks","department":"MOJ","category":"Infrastructure and Construction","description":"The prison population is forecast is scheduled to rise significantly in the 2020s and the department is bringing forward new prison places to accommodate new offenders. The Accelerated Houseblock Programme aims to deliver 2,500 places as part of the wider Prison Capacity Portfolio Programme with an aim to deliver over 20,000 places.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 decreased from Amber/red to Amber The Programme has just completed its 2nd design stage, Management Contractors have been appointed and the contract has been executed and signed. Confidence continues to be affected by the impact of COVID-19 and EU Exit, with ongoing risks regarding supply chain and inflationary pressures on the market with several infrastructure programmes underway across the Government.","startDate":"2020-09-28","endDate":"2024-05-13","scheduleNarrative":"Compared to 20/21 Q4, the project end date has remained static.","fyBaseline":52.2,"fyForecast":18.59,"fyVariance":-64.0,"varianceNarrative":"The budget variance exceeds 5%. The variance is due to some activity moving into the next financial year.","wholeLifeCost":12208.0,"costNarrative":"Compared to 2021-Q4, the projects Baseline Whole Life Cost decreased from 12491.43 (£m) to 12207.66 (£m). This is primarily due to the following factors: The whole life cost reported last year being based on initial estimates which have now been revised in the latest business case.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Commercial & supply chain","Approvals & decisions","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 decreased from Amber/red to Amber The Programme has just completed its 2nd design stage, Management Contractors have been appointed and the contract has been executed and signed. Confidence continues to be affected by the impact of…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"MOJ_0053_2021-Q4","year":2023,"name":"Accelerated Houseblocks","department":"MOJ","category":"Infrastructure and Construction","description":"The Accelerated Houseblock Programme aims to deliver around 2,400 places as part of the wider Prison Capacity Portfolio Programme.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. Compared to21/22 Q4, theproject'sDelivery Confidence Assessment rating remained Amber.The Amber assessment is driven by inflation risks and recruitment challenges.","startDate":"2020-09-28","endDate":null,"scheduleNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","fyBaseline":357.0,"fyForecast":61.5,"fyVariance":-83.0,"varianceNarrative":"The underspend is due to changes in scope and wider budget reprofiling.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This project currently reports no monetised benefits. Due to the projected increasing prisons population, this project focusses on increasing capacity and there are no monetised benefits to be claimed. The programme's other benefits are defined in the current baseline as: construction benefits and outcomes (capacity, modern methods of construction and sustainability); to enable an improvement in prisoner rehabilitation outcomes; and, during its construction, deliver local community benefits.","themes":["Commercial & supply chain","Cost & funding","Delivery & schedule","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. Compared to21/22 Q4, theproject'sDelivery Confidence Assessment rating remained Amber.The Amber assessment is driven by inflation risks and recruitment challenges.…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"MOJ_0053_2021-Q4","year":2024,"name":"Accelerated Houseblocks","department":"MOJ","category":"Infrastructure and Construction","description":"The Accelerated Houseblocks Programme supports our 20,000 additional prison places commitment; its scope is to deliver around 2,400 places.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. Inflation risks contributing to the increasing cost estimate, which is greater than that estimated previously.","startDate":"2020-09-28","endDate":null,"scheduleNarrative":"Exempt under Section 22 of the Freedom of Information Act 2000 (Information intended for future publication)","fyBaseline":326.72,"fyForecast":148.46,"fyVariance":-55.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The underspend is due to delays following complexity of build and challenging site conditions, requiring some costs to be re-profiled into future financial years.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":0.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 0m. This project currently reports no monetised benefits. Due to the projected increasing prisons population, this project focusses on increasing capacity and there are no monetised benefits to be claimed. The programme's other benefits are defined in the current baseline as: construction benefits and outcomes (capacity, modern methods of construction and sustainability); to enable an improvement in prisoner rehabilitation outcomes; and, during its construction, deliver local community benefits.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. Inflation risks contributing to the increasing cost estimate, which is greater than that estimated previously. Exempt under Section 22 of the Freedom of Information…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"MOJ_0053_2021-Q4","year":2025,"name":"Accelerated Houseblocks","department":"MoJ","category":"Infrastructure and Construction","description":"The Accelerated Houseblocks Programme supports our 20,000 additional prison places commitment; its scope is to deliver around 2,400 places.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Inflation, market risks, and increasing cost maturity contributing to increasing cost estimates.","startDate":"2020-09-28","endDate":"2028-07-10","scheduleNarrative":"The project's end-date at 24/25-Q4 is scheduled to be 10/07/2028. This is primarily due to the following factors‚ Challenging site conditions.","fyBaseline":559.04,"fyForecast":342.2,"fyVariance":38.79,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The underspend is due to delays following increased cost estimates which necessitated value engineering and scope review, requiring some costs to be re-profiled into future financial years.","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ This project currently reports no monetised benefits. Due to the projected increasing prisons population, this project focusses on increasing capacity and there are no monetised benefits to be claimed. The programme's other benefits are defined in the current baseline as: construction benefits and outcomes (capacity, modern methods of construction and sustainability); to enable an improvement in prisoner rehabilitation outcomes; and, during its construction, deliver local community benefits.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Inflation, market risks, and increasing cost maturity contributing to increasing cost estimates. The project's end-date at 24/25-Q4 is scheduled to be 10/07/2028.…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"MOJ_0053_2021-Q4","year":2026,"name":"Accelerated Houseblocks","department":"MOJ","category":"Infrastructure and Construction","description":"The Accelerated Houseblocks Programme supports our 20,000 additional prison places commitment; its scope is to deliver around 2,400 places.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25-Q4, the NISTA Delivery Confidence Assessment remains at Amber. This is primarily due to inflation and increasing cost maturity resulting in increasing cost estimates and other market risks.","startDate":"2020-09-28","endDate":"2030-11-01","scheduleNarrative":"Compared to financial year 24/25-Q4 the programme’s end date changed from 10/07/28 to 01/11/30. This is primarily due to scope increases within the project resulting in more time required to achieve overall programme completion.","fyBaseline":608.61,"fyForecast":510.79,"fyVariance":16.07,"varianceNarrative":"The budget variance exceeds 5%. This is due to scope and cost rebaselining.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"This programme currently reports no monetised benefits. Due to the projected increasing prison population, this programme focuses on increasing capacity and there are no monetised benefits to be claimed. The programme's other benefits are defined in the current baseline as: construction benefits and outcomes (capacity, modern methods of construction and sustainability); to enable an improvement in prisoner rehabilitation outcomes; and, during its construction, deliver local community benefits.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 24/25-Q4, the NISTA Delivery Confidence Assessment remains at Amber. This is primarily due to inflation and increasing cost maturity resulting in increasing cost estimates and other market risks. Compared to financial year 24/25-Q4 the programme’s end date changed from 10/07/28 to 01/11/30. This is primarily due to scope increases…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"MOJ_0053_2021-Q4","year":2025,"name":"Accelerated Houseblocks","department":"MoJ","category":"Infrastructure and Construction","description":"The Accelerated Houseblocks Programme supports our 20,000 additional prison places commitment; its scope is to deliver around 2,400 places.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Inflation, market risks, and increasing cost maturity contributing to increasing cost estimates.","startDate":"2020-09-28","endDate":"2028-07-10","scheduleNarrative":"The project's end-date at 24/25-Q4 is scheduled to be 10/07/2028. This is primarily due to the following factors‚ Challenging site conditions.","fyBaseline":559.04,"fyForecast":342.2,"fyVariance":38.79,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The underspend is due to delays following increased cost estimates which necessitated value engineering and scope review, requiring some costs to be re-profiled into future financial years.","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ This project currently reports no monetised benefits. Due to the projected increasing prisons population, this project focusses on increasing capacity and there are no monetised benefits to be claimed. The programme's other benefits are defined in the current baseline as: construction benefits and outcomes (capacity, modern methods of construction and sustainability); to enable an improvement in prisoner rehabilitation outcomes; and, during its construction, deliver local community benefits.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Inflation, market risks, and increasing cost maturity contributing to increasing cost estimates. The project's end-date at 24/25-Q4 is scheduled to be 10/07/2028.…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":844,"attentionScore":43,"attentionReasons":["Current published delivery confidence is Amber","Published end date moved 844 days later","In-year forecast variance is +16.1%"]},{"id":"BEIS_0241_2324-Q1","year":2026,"name":"BEPPS2","department":"DESNZ","category":"Infrastructure and Construction","description":"The Box Encapsulation Plant Product Store 2 (BEPPS2) is a critical enabler for Sellafield Ltd to allow continued high hazard retrieval operations from Magnox Swarf Storage Silo (MSSS) and Pile Fuel Cladding Silo (PFCS). The BEPPS2 project will provide the capacity to store circa 7500 packages of legacy Intermediate Level Waste (ILW), safely and securely in a modern facility for long term interim storage.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 decreased to Amber. This is primarily due to the following factors: Although target design maturity has been achieved, and good progress continues in bulk excavation and preparation for construction on the site, placement of the civil substructure sub-contract is ongoing. Timely release of the sanction held against the Outline Business Case (OBC) is essential to avoid delay to future key commitments required to progress project delivery and impact to the critical path. A prudent assessment of Amber recognises the potential to impact future key commitments required to progress project delivery. The rating is expected to return to Green once the sanction is released.","startDate":"2017-11-01","endDate":"2035-06-30","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same at 30/06/2035.","fyBaseline":61.33,"fyForecast":60.44,"fyVariance":1.45,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":727.6,"costNarrative":"The increase to the project's departmentally agreed Whole Life Cost at 25/26-Q4 is primarily due to: Annual Indexation, in line with the agreed indices.","benefits":null,"benefitsNarrative":"There are no monetised benefits within the BEPPS2 project however, it will contribute towards NDA’s strategic outcome 33: All Intermediate Level Waste in interim storage. The project does this by providing additional storage on the Sellafield site.","themes":["Delivery & schedule","Cost & funding","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 decreased to Amber. This is primarily due to the following factors: Although target design maturity has been achieved, and good progress continues in bulk excavation and preparation for construction on the site, placement of the civil substructure…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"BEIS_0241_2324-Q1","year":2024,"name":"BEPPS2","department":"DESNZ","category":"Infrastructure and Construction","description":"The Box Encapsulation Plant Product Store (BEPPS2) is a critical enabler for Sellafield Ltd to allow high hazard retrieval operations from Magnox Swarf Storage Silo (MSSS) and Pile Fuel Cladding Silo (PFCS). The BEPPS2 project will provide the capacity to store 7470 packages of legacy Intermediate Level Waste (ILW), safely and securely in a modern facility with a design life of 100 years.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 is Green. This is primarily due to the following factors. This is a nuclear project on an operational nuclear site. The Project is in the define stage. The BEPPS2 project is being delivered by the Programme and Project Partnership (PPP). The SRO DCA is a RAG rating of GREEN representing delivery against the Outline Business Case (OBC) approved by HMG in September 2023. The project is showing no significant threat to the overall P80 schedule and continues to proactively manage opportunities whilst mitigating and balancing current and future threats, keeping the forecast completion of the BEPPS2 project within the strategic tolerances of the Programme.","startDate":"2017-11-01","endDate":"2035-06-30","scheduleNarrative":"The project's end-date at 23/24-Q4 is 2035-06-30. This is primarily due to the following factors. The Project remains on schedule and there is no change to the date of 30 June 2035.","fyBaseline":27.7,"fyForecast":14.81,"fyVariance":-47.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The in year spend is less than the budget (baseline) for 2023/24 due to intentionally not taking over the site as initially planned as there was no project requirement yet, efficiencies achieved on Site Preparation and Surveys and non utilisation of contingency/estimating uncertainty. This shows that the project is not spending money ahead of demand whilst not affecting the overall spend position or having any impact on the project schedule. This better aligns to the current delivery strategy.","wholeLifeCost":727.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 23/24-Q4 is 727m. This is primarily due to the following factors. The BEPPS2 budgeted cost (baseline) has increased, this is due to escalation in line with the agreed indices.","benefits":0.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 0m. Contribution towards NDA's strategic outcome 33: All Intermediate Level Waste in interim storage. The project does this by providing additional storage on the Sellafield site.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 is Green. This is primarily due to the following factors. This is a nuclear project on an operational nuclear site. The Project is in the define stage. The BEPPS2 project is being delivered by the Programme and Project Partnership (PPP). The SRO DCA is a RAG rating of GREEN…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"BEIS_0241_2324-Q1","year":2025,"name":"BEPPS2","department":"DESNZ","category":"Infrastructure and Construction","description":"The Box Encapsulation Plant Product Store (BEPPS2) is a critical enabler for Sellafield Ltd to allow high hazard retrieval operations from Magnox Swarf Storage Silo (MSSS) and Pile Fuel Cladding Silo (PFCS). The BEPPS2 project will provide the capacity to store 7470 packages of legacy Intermediate Level Waste (ILW), safely and securely in a modern facility with a design life of 100 years.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at GREEN. This is primarily due to the following factors‚ This is a nuclear project on an operational nuclear site. The Project is in the define stage. The BEPPS2 project is being delivered by the Programme and Project Partnership (PPP). The SRO DCA is a RAG rating of GREEN representing delivery against the Outline Business Case (OBC) approved by HMG in September 2023. The project is showing no significant threat to the overall P80 schedule and continues to proactively manage opportunities whilst mitigating and balancing current and future threats, keeping the forecast completion of the BEPPS2 project within the strategic tolerances of the Programme.","startDate":"2017-11-01","endDate":"2035-06-30","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 30/06/2035. This is primarily due to the following factors‚ The Project remains on schedule and there is no change to the date of 30/06/2035.","fyBaseline":38.71,"fyForecast":35.74,"fyVariance":7.67,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The in year spend is less than the budget (baseline) for 2024/25 due primarily non utilisation of contingency.","wholeLifeCost":747.34,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 727 to 747. This is primarily due to the following factors‚ Compared to 23/24-Q4, the BEPPS2 budgeted cost (baseline) has increased, this is due to escalation in line with the agreed indices.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ There are no monetised benefits within the BEPPS2 project however, it will contribute towards NDA’s strategic outcome 33: All Intermediate Level Waste in interim storage. The project does this by providing additional storage on the Sellafield site.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at GREEN. This is primarily due to the following factors‚ This is a nuclear project on an operational nuclear site. The Project is in the define stage. The BEPPS2 project is being delivered by the Programme and Project…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"BEIS_0241_2324-Q1","year":2026,"name":"BEPPS2","department":"DESNZ","category":"Infrastructure and Construction","description":"The Box Encapsulation Plant Product Store 2 (BEPPS2) is a critical enabler for Sellafield Ltd to allow continued high hazard retrieval operations from Magnox Swarf Storage Silo (MSSS) and Pile Fuel Cladding Silo (PFCS). The BEPPS2 project will provide the capacity to store circa 7500 packages of legacy Intermediate Level Waste (ILW), safely and securely in a modern facility for long term interim storage.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 decreased to Amber. This is primarily due to the following factors: Although target design maturity has been achieved, and good progress continues in bulk excavation and preparation for construction on the site, placement of the civil substructure sub-contract is ongoing. Timely release of the sanction held against the Outline Business Case (OBC) is essential to avoid delay to future key commitments required to progress project delivery and impact to the critical path. A prudent assessment of Amber recognises the potential to impact future key commitments required to progress project delivery. The rating is expected to return to Green once the sanction is released.","startDate":"2017-11-01","endDate":"2035-06-30","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same at 30/06/2035.","fyBaseline":61.33,"fyForecast":60.44,"fyVariance":1.45,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":727.6,"costNarrative":"The increase to the project's departmentally agreed Whole Life Cost at 25/26-Q4 is primarily due to: Annual Indexation, in line with the agreed indices.","benefits":null,"benefitsNarrative":"There are no monetised benefits within the BEPPS2 project however, it will contribute towards NDA’s strategic outcome 33: All Intermediate Level Waste in interim storage. The project does this by providing additional storage on the Sellafield site.","themes":["Delivery & schedule","Cost & funding","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 decreased to Amber. This is primarily due to the following factors: Although target design maturity has been achieved, and good progress continues in bulk excavation and preparation for construction on the site, placement of the civil substructure…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"BEIS_0241_2324-Q1","year":2025,"name":"BEPPS2","department":"DESNZ","category":"Infrastructure and Construction","description":"The Box Encapsulation Plant Product Store (BEPPS2) is a critical enabler for Sellafield Ltd to allow high hazard retrieval operations from Magnox Swarf Storage Silo (MSSS) and Pile Fuel Cladding Silo (PFCS). The BEPPS2 project will provide the capacity to store 7470 packages of legacy Intermediate Level Waste (ILW), safely and securely in a modern facility with a design life of 100 years.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at GREEN. This is primarily due to the following factors‚ This is a nuclear project on an operational nuclear site. The Project is in the define stage. The BEPPS2 project is being delivered by the Programme and Project Partnership (PPP). The SRO DCA is a RAG rating of GREEN representing delivery against the Outline Business Case (OBC) approved by HMG in September 2023. The project is showing no significant threat to the overall P80 schedule and continues to proactively manage opportunities whilst mitigating and balancing current and future threats, keeping the forecast completion of the BEPPS2 project within the strategic tolerances of the Programme.","startDate":"2017-11-01","endDate":"2035-06-30","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 30/06/2035. This is primarily due to the following factors‚ The Project remains on schedule and there is no change to the date of 30/06/2035.","fyBaseline":38.71,"fyForecast":35.74,"fyVariance":7.67,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The in year spend is less than the budget (baseline) for 2024/25 due primarily non utilisation of contingency.","wholeLifeCost":747.34,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 727 to 747. This is primarily due to the following factors‚ Compared to 23/24-Q4, the BEPPS2 budgeted cost (baseline) has increased, this is due to escalation in line with the agreed indices.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ There are no monetised benefits within the BEPPS2 project however, it will contribute towards NDA’s strategic outcome 33: All Intermediate Level Waste in interim storage. The project does this by providing additional storage on the Sellafield site.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at GREEN. This is primarily due to the following factors‚ This is a nuclear project on an operational nuclear site. The Project is in the define stage. The BEPPS2 project is being delivered by the Programme and Project…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":1,"transition":"Worsened","endDateDeltaDays":0,"attentionScore":43,"attentionReasons":["Current published delivery confidence is Amber","Published rating worsened from Green to Amber"]},{"id":"MOD_0137_2122-Q1","year":2026,"name":"EUROPEAN COMMON RADAR SYSTEM MK 2","department":"MOD","category":"Military Capability","description":"The Phase 4 Enhancement (P4E) to the Typhoon aircraft includes upgrades to mission management systems, GPS resilience and navigational precision. It also provides the vehicle for the integration of the European Common Radar System (ECRS) Mk2 onto the aircraft. The radar is being developed to enable the aircraft to simultaneously detect, identify and track various targets on land and in the air and is vital to maintain Typhoon’s control of the air. It also provides a new Electronic Warfare capability and sustains Typhoon capability to operate in contested and congested Electromagnetic environments. The programme is being delivered via multiple interdependent contracts. Radar development is being led nationally by the UK, whereas the wider P4E changes to the aircraft systems are being developed with the other Typhoon Partner Nations as part of the international Eurofighter Programme.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors. 1. The overall radar design schedule has stabilised and has successfully moved into the manufacture phase with confidence growing on production radars being available in 2028 as planned. However, securing an acceptable delivery schedule for P4E from Eurofighter through the NATO Eurofighter and Tornado Management Agency (NETMA), which is essential to embodying the radar, remains a significant challenge for the UK and Partner Nations. 2. Whilst P4E content has been agreed, Partner Nations are working continually with NETMA and Eurofighter to establish a progressive release of capability which meets each nation's operational need without being detrimental to delivery of the overall programme, alongside extensive transformation being pursued within the NETMA and Eurofighter enterprises.","startDate":"2019-02-01","endDate":"2034-12-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 01/08/2032.","fyBaseline":263.95,"fyForecast":303.89,"fyVariance":15.13,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors: 1. The overspend is the result of the reprofiling of P4E Long Lead Time activities and ECRS Mk2 production into FY25/26 to ensure the critical path is maintained.","wholeLifeCost":2899.01,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) increased from £2902M to £2930M. This is primarily due to the following factors. 1. Minimal cost growth, principally down to increased Typhoon Defensive Aids Sub-System scope/requirements within P4E. 2. The Programme remains within its Approved Budgetary Level.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Delivery & schedule","Scope & requirements","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors. 1. The overall radar design schedule has stabilised and has successfully moved into the manufacture phase with confidence growing on production radars being available in 2028 as…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"MOD_0137_2122-Q1","year":2022,"name":"European Common Radar System Mk 2","department":"MOD","category":"Military Capability","description":"The aim of the programme is to develop and integrate a world-class radar system which will keep RAF Typhoon, UK industry and Eurofighter exports at the forefront of military capability development and delivery. The European Common Radar System Mark 2 will be an Active Electronically Scanned Array as an upgrade from the current mechanically scanned sensor. In addition to a step-change improvement to traditional radar functions, this will give UK Typhoons a state-of-the-art Electronic Warfare capability including wide band Electronic Attack, essential in securing Control of the Air beyond 2030. European Common Radar System Mk2 investment sustains a highly specialised, world-leading UK industry base and ensures advanced technical skills and expertise in complex sensors are available for the Future Combat Air System programme. Delivering European Common Radar System Mk2 into service demonstrates the UK's cutting-edge technological capabilities and builds international confidence in UK industrial capability. Integrating European Common Radar System Mk2 onto Typhoon ensures that it remains competitive for winning new export orders and provides a substantial revenue stream for UK industry from retrofitting the radar onto current Typhoon export customers' aircraft.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber. This is primarily due to the following factors: This reflects the assessment made in November 21 after the affordability of the programme was demonstrated in the Phase 4 Enhancement/European Common Radar System Mk2 Full Business Case which received MOD approval in Dec 2021 and Her Majesty's Treasury approval in Mar 2022.","startDate":"2019-02-01","endDate":"2040-01-01","scheduleNarrative":"The project end-date is 01 January 2040. This is primarily due to the following factors: The Programme entered the Government Major Projects Portfolio in Financial Year 2021/22, as such there is no baseline date recorded for March 21 for comparison.","fyBaseline":192.47,"fyForecast":154.17,"fyVariance":-21.0,"varianceNarrative":"The budget variance exceeds 5%. Variance is a £38.301M (or 20%) underspend against the In-Year budget. This is principally the result of fluctuation in Foreign Exchange Rates, contractor performance slippage (particularly on the Long Lead Time Activity 5b project); and delay to the B Model Multicore Processor and Receiver Milestones.","wholeLifeCost":565.0,"costNarrative":"The projects Baseline Whole Life Costs is 565.21 (£M). This is primarily due to the following factors: The current Whole Life Costs reflect the Long Lead Time Activity 5b project finances only. The Phase 4 Enhancement/European Common Radar System Full Business Case Approved Budgetary Level of £2,352M is not yet recorded.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Commercial & supply chain"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber. This is primarily due to the following factors: This reflects the assessment made in November 21 after the affordability of the programme was demonstrated in the Phase 4 Enhancement/European Common Radar System Mk2 Full Business Case which received MOD approval in Dec…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"MOD_0137_2122-Q1","year":2023,"name":"European Common Radar System Mk 2","department":"MOD","category":"Military Capability","description":"The Phase 4 Enhancement (P4E) to the Typhoon aircraft includes upgrades to mission management systems, GPS resilience and navigational precision. It also provides the vehicle for the integration of the European Common Radar System Mk2 onto the aircraft. The radar is being developed to enable the aircraft to simultaneously detect, identify and track various targets on land and in the air and is vital to maintain Typhoon's control of the air. It also provides a new Electronic Warfare capability and sustains Typhoon capability to operate in contested and congested Electromagnetic environments. The programme is being delivered via multiple interdependent contracts. Radar development is being led nationally by the UK; whereas the wider P4E changes to the aircraft systems are being developed with the other Typhoon Partner Nations as part of the international Eurofighter Programme.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. Following successful completion on schedule of the acceptance test procedure, the European Common Radar System Mk2 prototype and supporting documentation was dispatched for the next stage of development. Delayed completion of the Antenna Power Supply and Controller Critical Design Review has impacted the date for the full Radar System Critical Design Review. However, the delay does not impact critical path development activities towards the Initial Operating Capability which are centred around antenna development and are progressing in parallel.","startDate":"2023-02-20","endDate":"2023-01-20","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 decreased from 2040-01-01 to 2023-01-20. This is primarily due to the following factors. NA","fyBaseline":153.01,"fyForecast":173.32,"fyVariance":13.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors: A pull forward of funding from later years to reflect work already completed by Industry at risk. As a result the funding profile for future years has been adjusted accordingly.","wholeLifeCost":2740.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 increased from 565m. to 2740m. This is primarily due to the following factors. The P4E/ECRS Mk2 Programme Full Business Case was approved in March 2022, securing an Approved Budgetary Level funding envelope from its design and manufacture through to the equipment's Full Operating Capability. There has been no change to the programmes requirements and the funding levels remain extant.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This programme does not report cashable benefits. Its aim is to provision the armed forces with the equipment and / or infrastructure required.","themes":["Cost & funding","Delivery & schedule","Scope & requirements","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. Following successful completion on schedule of the acceptance test procedure, the European Common Radar System Mk2 prototype and supporting documentation was…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"MOD_0137_2122-Q1","year":2024,"name":"European Common Radar System Mk 2","department":"MOD","category":"Military Capability","description":"The Phase 4 Enhancement (P4E) to the Typhoon aircraft includes upgrades to mission management systems, GPS resilience and navigational precision. It also provides the vehicle for the integration of the European Common Radar System (ECRS) Mk2 onto the aircraft. The radar is being developed to enable the aircraft to simultaneously detect, identify and track various targets on land and in the air and is vital to maintain Typhoon’s control of the air. It also provides a new Electronic Warfare capability and sustains Typhoon capability to operate in contested and congested Electromagnetic environments. The programme is being delivered via multiple interdependent contracts. Radar development is being led nationally by the UK, whereas the wider P4E changes to the aircraft systems are being developed with the other Typhoon Partner Nations as part of the international Eurofighter Programme.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure and Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. Despite delayed completion of the System Critical Design Review from September 21 to November 23, closure of outstanding action is expected in April 24. This has not impacted on the critical path development activities towards the Initial Operating Capability which are centred around antenna development which is progressing in parallel. With the earlier placement of the Phase 1 contract with industry partners, allocation of sub-contracts with suppliers to secure long-lead and high value materials within the terms of the Instruction to Proceed is ongoing.","startDate":"2021-07-01","endDate":"2032-08-01","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 increased from 2023-01-20 to 2032-08-01. This is primarily due to the following factors. The Q4 22/23 end date of 2023-01-20 was incorrect. It should have read 2032-08-01 and so is unchanged at Q4 23/24. Initial Operating Capability (IOC) and Full Operating Capability dates remain unchanged despite the delay to the System Critical Design Review. The establishment of a joint programme governance structure has allowed MOD and Industry to share information effectively and prioritise resources to maintain the schedule. The agreement of a proposal to complete radar development up to IOC has decreased the risk of schedule slippage in this area. Although progress has been made with the other Typhoon Partner Nations and their industries in fixing the scope and schedule of the development of the wider aircraft changes needed to integrate the radar and introduce other P4E capabilities, risk remains.","fyBaseline":140.09,"fyForecast":221.93,"fyVariance":58.42,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. An intentional bring forward of spend by reprofiling costs from future years.","wholeLifeCost":2904.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 increased from 2740m to 2904m. This is primarily due to the following factors. Reflects release of further budget to the Programme including the allocation of a budget for FY 32/33. The Programme’s Full Business Case was approved in March 2022 securing an Approved Budgetary Level (ABL) funding envelope which covers the equipment’s design and manufacture through to its Full Operating Capability and subsequent likely out of service date. There has been no change to the programmes requirements and the increase in Budgeted WLC is contained within the extant ABL.","benefits":0.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 0m.","themes":["Cost & funding","Delivery & schedule","Scope & requirements","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure and Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. Despite delayed completion of the System Critical Design Review from September 21 to November 23, closure of outstanding action is expected in April 24. This has…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"MOD_0137_2122-Q1","year":2025,"name":"EUROPEAN COMMON RADAR SYSTEM MK 2","department":"MoD","category":"Military Capability","description":"The Phase 4 Enhancement (P4E) to the Typhoon aircraft includes upgrades to mission management systems, GPS resilience and navigational precision. It also provides the vehicle for the integration of the European Common Radar System (ECRS) Mk2 onto the aircraft. The radar is being developed to enable the aircraft to simultaneously detect, identify and track various targets on land and in the air and is vital to maintain Typhoon’s control of the air. It also provides a new Electronic Warfare capability and sustains Typhoon capability to operate in contested and congested Electromagnetic environments. The programme is being delivered via multiple interdependent contracts. Radar development is being led nationally by the UK, whereas the wider P4E changes to the aircraft systems are being developed with the other Typhoon Partner Nations as part of the international Eurofighter Programme.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. FY 24/25 continued to present some key challenges. The important risk reduction activity of the ECRS Mk2 Step 1 (prototype system) flight trails have completed and the in-flight data will support the continued development of the system. Securing the UK Minimum Viable Product in the P4E has continued at pace with a plethora of challenging negotiations with Partner Nations. Some uncertainty has been addressed but significant challenges remain to assure the delivery of the ECRS Mk2 capability by 2030.","startDate":"2021-07-01","endDate":"2032-08-01","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 01/08/2032. This is primarily due to the following factors. No change in project end-date.","fyBaseline":207.85,"fyForecast":208.57,"fyVariance":0.35,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":2902.02,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 2904 to 2902. This is primarily due to the following factors. Minimal change that remains within approval tolerances.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Technical & integration"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. FY 24/25 continued to present some key challenges. The important risk reduction activity of the ECRS Mk2 Step 1 (prototype system) flight trails have completed and the in-flight data will support the…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"MOD_0137_2122-Q1","year":2026,"name":"EUROPEAN COMMON RADAR SYSTEM MK 2","department":"MOD","category":"Military Capability","description":"The Phase 4 Enhancement (P4E) to the Typhoon aircraft includes upgrades to mission management systems, GPS resilience and navigational precision. It also provides the vehicle for the integration of the European Common Radar System (ECRS) Mk2 onto the aircraft. The radar is being developed to enable the aircraft to simultaneously detect, identify and track various targets on land and in the air and is vital to maintain Typhoon’s control of the air. It also provides a new Electronic Warfare capability and sustains Typhoon capability to operate in contested and congested Electromagnetic environments. The programme is being delivered via multiple interdependent contracts. Radar development is being led nationally by the UK, whereas the wider P4E changes to the aircraft systems are being developed with the other Typhoon Partner Nations as part of the international Eurofighter Programme.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors. 1. The overall radar design schedule has stabilised and has successfully moved into the manufacture phase with confidence growing on production radars being available in 2028 as planned. However, securing an acceptable delivery schedule for P4E from Eurofighter through the NATO Eurofighter and Tornado Management Agency (NETMA), which is essential to embodying the radar, remains a significant challenge for the UK and Partner Nations. 2. Whilst P4E content has been agreed, Partner Nations are working continually with NETMA and Eurofighter to establish a progressive release of capability which meets each nation's operational need without being detrimental to delivery of the overall programme, alongside extensive transformation being pursued within the NETMA and Eurofighter enterprises.","startDate":"2019-02-01","endDate":"2034-12-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 01/08/2032.","fyBaseline":263.95,"fyForecast":303.89,"fyVariance":15.13,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors: 1. The overspend is the result of the reprofiling of P4E Long Lead Time activities and ECRS Mk2 production into FY25/26 to ensure the critical path is maintained.","wholeLifeCost":2899.01,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) increased from £2902M to £2930M. This is primarily due to the following factors. 1. Minimal cost growth, principally down to increased Typhoon Defensive Aids Sub-System scope/requirements within P4E. 2. The Programme remains within its Approved Budgetary Level.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Delivery & schedule","Scope & requirements","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors. 1. The overall radar design schedule has stabilised and has successfully moved into the manufacture phase with confidence growing on production radars being available in 2028 as…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"MOD_0137_2122-Q1","year":2025,"name":"EUROPEAN COMMON RADAR SYSTEM MK 2","department":"MoD","category":"Military Capability","description":"The Phase 4 Enhancement (P4E) to the Typhoon aircraft includes upgrades to mission management systems, GPS resilience and navigational precision. It also provides the vehicle for the integration of the European Common Radar System (ECRS) Mk2 onto the aircraft. The radar is being developed to enable the aircraft to simultaneously detect, identify and track various targets on land and in the air and is vital to maintain Typhoon’s control of the air. It also provides a new Electronic Warfare capability and sustains Typhoon capability to operate in contested and congested Electromagnetic environments. The programme is being delivered via multiple interdependent contracts. Radar development is being led nationally by the UK, whereas the wider P4E changes to the aircraft systems are being developed with the other Typhoon Partner Nations as part of the international Eurofighter Programme.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. FY 24/25 continued to present some key challenges. The important risk reduction activity of the ECRS Mk2 Step 1 (prototype system) flight trails have completed and the in-flight data will support the continued development of the system. Securing the UK Minimum Viable Product in the P4E has continued at pace with a plethora of challenging negotiations with Partner Nations. Some uncertainty has been addressed but significant challenges remain to assure the delivery of the ECRS Mk2 capability by 2030.","startDate":"2021-07-01","endDate":"2032-08-01","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 01/08/2032. This is primarily due to the following factors. No change in project end-date.","fyBaseline":207.85,"fyForecast":208.57,"fyVariance":0.35,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":2902.02,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 2904 to 2902. This is primarily due to the following factors. Minimal change that remains within approval tolerances.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Technical & integration"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. FY 24/25 continued to present some key challenges. The important risk reduction activity of the ECRS Mk2 Step 1 (prototype system) flight trails have completed and the in-flight data will support the…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":882,"attentionScore":43,"attentionReasons":["Current published delivery confidence is Amber","Published end date moved 882 days later","In-year forecast variance is +15.1%"]},{"id":"MOD_0125_2021-Q4","year":2026,"name":"NEW MEDIUM HELICOPTER","department":"MOD","category":"Military Capability","description":"The New Medium Helicopter programme intends to rationalise up to three rotary wing requirements under one aircraft-type. This approach will maximise commonality allowing improvements in efficiency and operational flexibility. The user requires a multi-role platform to operate in all environments in support of Defence tasks and across a spectrum of threats. An open systems architecture is required to allow for rapid employment of different role-fits and carry-on equipment. This will enable efficient future development to meet the demands of a changing threat environment.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25-Q4, the NISTA/SRO Delivery Confidence Assessment rating at 25/26-Q4 remained at Amber. This is primarily due to the following factors: 1.Although the Full Business Case has been approved by cross-government stakeholders, and the contract now awarded to Leonardo Helicopters UK in March 2026, agreement was achieved months later than planned. 2.Other causes of this assessment are resourcing (including lack of resource loaded schedules) across the core programme and delivery teams, because of the delay to approving the Full Business Case.","startDate":"2021-04-30","endDate":"2037-05-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 30/09/2032.","fyBaseline":6.76,"fyForecast":5.84,"fyVariance":13.57,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. 1. Spend on infrastructure being lower than planned, due to pausing activity with a Technical Services Provider to refresh the user requirements following uncertainty with progressing options while the Full Business Case was still awaiting an approval.","wholeLifeCost":1404.92,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) increased from £1222.09M to £1574.04M. This is primarily due to the following factors. 1. Delay in approving the Full Business Case, and now reflecting a new 10-year provision, starting in Financial Year 26/27 (The Outline Business Case provision ended in 31/32). 2. There is also a longer initial support provision when compared to the Outline Business Case Whole Life Cost estimates.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 24/25-Q4, the NISTA/SRO Delivery Confidence Assessment rating at 25/26-Q4 remained at Amber. This is primarily due to the following factors: 1.Although the Full Business Case has been approved by cross-government stakeholders, and the contract now awarded to Leonardo Helicopters UK in March 2026, agreement was achieved months…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"MOD_0125_2021-Q4","year":2021,"name":"New Medium Helicopter","department":"MOD","category":"Military Capability","description":"The UK government published the outcome of its Integrated Review of Security, Defence, Development and Foreign Policy on 16 March 2021. In its accompanying Command Paper published on 22 March 2021, the Government announced that investment in a new medium lift helicopter in the mid-2020s will enable a consolidation of the Army's disparate fleet of medium lift helicopters from four platform types to one. Work is now underway to develop the strategic options for this programme and at pace, but at this stage the full scope, cost and timescales for delivery are not yet available.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber.This is primarily due to the following factors: As this stage a prudent Delivery Confidence Assessment of Amber is warranted as the supporting evidence and detail that demonstrates the most suitable capability for Defence, provides value for money, and can be delivered within expected timescales is being developed. It is only when this is in place can a justifiable delivery confidence assessment be made.","startDate":"2021-04-30","endDate":"2036-03-31","scheduleNarrative":"The project end-date is 31 March 2036. This is primarily due to the following factors: The estimate of programme closure has been made on rough order of magnitude and assumptions from other procurement activities of this type. As the work in this area matures a risk adjusted schedule will be available and will better inform Programme closure timelines","fyBaseline":0.0,"fyForecast":0.0,"fyVariance":null,"varianceNarrative":"Some modest investment has been made to initiate this programme, the business cases that will set out the required level of investment and budgetary requirements are being developed and at pace. This will be disclosed to a public audience if it is appropriate to do so while respecting any commercial or security sensitivities.","wholeLifeCost":0.0,"costNarrative":"The GMPP project did not provide data","benefits":null,"benefitsNarrative":"","themes":["Delivery & schedule","Commercial & supply chain","Technical & integration","Workforce & capability"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber.This is primarily due to the following factors: As this stage a prudent Delivery Confidence Assessment of Amber is warranted as the supporting evidence and detail that demonstrates the most suitable capability for Defence, provides value for money, and can be delivered…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21"},{"id":"MOD_0125_2021-Q4","year":2022,"name":"New Medium Helicopter","department":"MOD","category":"Military Capability","description":"The New Medium Helicopter programme intends to consolidate elements of Defence's disparate fleet of medium lift helicopters from four platform types to one, through the procurement of a new helicopter-type.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber. This is primarily due to the following factors: The supporting evidence and detail that demonstrates the most suitable capability for Defence, providing value for money, and also can be delivered within expected timescales is being developed. Work is at an advanced stage to confirm these aspects, which once agreed will allow a revised delivery confidence assessment to be made.","startDate":"2021-04-30","endDate":"2028-07-07","scheduleNarrative":"Compared to 2021-Q4 the project end-date decreased from 31 Dec 2036 to 07 Jul 2028 . This is primarily due to the following factors: The programme end-date has aligned with Full Operating Capability. There have been no changes to the New Medium Helicopter key milestones since the last Annual Report on Major Projects.","fyBaseline":8.0,"fyForecast":5.4,"fyVariance":-37.0,"varianceNarrative":"The budget variance exceeds 5%. Some modest investment has been made to initiate this programme. The business cases that will set out the required level of investment and budgetary requirements are being developed at pace.","wholeLifeCost":1172.0,"costNarrative":"The projects Baseline Whole Life Cost is 1172.00 (£m). This is primarily due to the following factors: The programme's Whole Life Cost, under current assumptions, is expected to be circa £2132.749M until the New Medium Helicopter's nominal out-of-service date of 2040. This figure includes £1172M captured as the programme's 10 year provision that includes initial aircraft procurement and initial support equipment, and subsequent through-life support to 2040. This assessment is consistent with the 2021 Annual Report on Major Projects.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Workforce & capability","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber. This is primarily due to the following factors: The supporting evidence and detail that demonstrates the most suitable capability for Defence, providing value for money, and also can be delivered within expected timescales is…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"MOD_0125_2021-Q4","year":2023,"name":"New Medium Helicopter","department":"MOD","category":"Military Capability","description":"The New Medium Helicopter programme intends to rationalise five rotary wing requirements through the procurement of one new medium lift helicopter-type. This approach will maximise commonality allowing improvements in efficiency and operational flexibility.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. The delay in securing the Outline Business Case approval. Significant work is ongoing to secure approval which will enable the main part of the New Medium Helicopter competition to proceed through the release of an Invitation-to-Negotiate which is expected later this year.","startDate":"2021-04-30","endDate":"2031-09-30","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 increased from 2028-07-07 to 2031-09-30. This is primarily due to the following factors. Since the initial report, further analysis on the programme schedule has been conducted and the financial profile was amended as part of the Ministry of Defence's Annual Budget Cycle 2022. This has led to a revision in the programme's projected end-date.","fyBaseline":3.9,"fyForecast":3.29,"fyVariance":-16.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors: The minor underspend results from activities moving into FY23/24 as a result of the programme not achieving the stretch target of Outline Business Case approval during FY22/23.","wholeLifeCost":1329.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 increased from 1172m. to 1329m. This is primarily due to the following factors. The programme received an uplift to safeguard the capabilities that the New Medium Helicopter programme plans to deliver.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This programme does not report cashable benefits. Its aim is to provision the armed forces with the equipment and / or infrastructure required.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. The delay in securing the Outline Business Case approval. Significant work is ongoing to secure approval which will enable the main part of the New Medium Helicopter…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"MOD_0125_2021-Q4","year":2024,"name":"New Medium Helicopter","department":"MOD","category":"Military Capability","description":"The New Medium Helicopter programme intends to rationalise up to five rotary wing requirements under one aircraft-type. This approach will maximise commonality allowing improvements in efficiency and operational flexibility. The user requires a multi-role platform to operate in all environments in support of Defence tasks and across a spectrum of threats. An open systems architecture is required to allow for rapid employment of different role-fits and carry-on equipment. This will enable efficient future development to meet the demands of a changing threat environment.","ipaDca":"Green","sroDca":null,"deliveryConfidence":"Green","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 increased from Amber to Green. This is primarily due to the following factors. Invitation to Negotiate release on 27/02/24, meaning the three candidate suppliers will now compile their bids to be evaluated by the Ministry of Defence to determine the winning bidder.","startDate":"2021-04-30","endDate":"2032-09-30","scheduleNarrative":"Compared to financial year 22/23-Q4, the programme's end-date at 23/24-Q4 remained scheduled to finish on 2032-09-30.","fyBaseline":4.23,"fyForecast":1.85,"fyVariance":-56.265,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. At this stage funds are required for critical project management and capability analysis work. The underspend is the result of the significant delay to securing Outline Business Case approval and Invitation-to-Negotiate release which faded several activities into Financial Year 24/25.","wholeLifeCost":1329.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 remained at 1329m. This is primarily due to the following factors. Programme expenditure has been largely stable, with a small adjustment to account for an infrastructure study costing less than originally anticipated.","benefits":0.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 0m.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 increased from Amber to Green. This is primarily due to the following factors. Invitation to Negotiate release on 27/02/24, meaning the three candidate suppliers will now compile their bids to be evaluated by the Ministry of Defence…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"MOD_0125_2021-Q4","year":2025,"name":"NEW MEDIUM HELICOPTER","department":"MoD","category":"Military Capability","description":"The New Medium Helicopter programme intends to rationalise up to three rotary wing requirements under one aircraft-type. This approach will maximise commonality allowing improvements in efficiency and operational flexibility. The user requires a multi-role platform to operate in all environments in support of Defence tasks and across a spectrum of threats. An open systems architecture is required to allow for rapid employment of different role-fits and carry-on equipment. This will enable efficient future development to meet the demands of a changing threat environment.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 increased from GREEN to AMBER. This is primarily due to the following factors. The Amber rating reflects challenges with workforce shortfalls across the core programme and delivery teams, and uncertainty about the outcome of the competition.","startDate":"2021-04-30","endDate":"2032-09-30","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 30/09/2032. The schedule will be further developed after completion of the New Medium Helicopter competition.","fyBaseline":6.58,"fyForecast":5.3,"fyVariance":19.5,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. Spend on infrastructure being lower than planned, due to Defence financial challenges and internal spend commitment controls.","wholeLifeCost":1222.09,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 1329 to 1222. This is primarily due to the following factors. Allocating some funding to support procurement of Airbus Jupiter HC Mk 2 (H145) helicopters for Brunei and Cyprus.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 increased from GREEN to AMBER. This is primarily due to the following factors. The Amber rating reflects challenges with workforce shortfalls across the core programme and delivery teams, and uncertainty about the outcome of the competition. Compared to financial year…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"MOD_0125_2021-Q4","year":2026,"name":"NEW MEDIUM HELICOPTER","department":"MOD","category":"Military Capability","description":"The New Medium Helicopter programme intends to rationalise up to three rotary wing requirements under one aircraft-type. This approach will maximise commonality allowing improvements in efficiency and operational flexibility. The user requires a multi-role platform to operate in all environments in support of Defence tasks and across a spectrum of threats. An open systems architecture is required to allow for rapid employment of different role-fits and carry-on equipment. This will enable efficient future development to meet the demands of a changing threat environment.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25-Q4, the NISTA/SRO Delivery Confidence Assessment rating at 25/26-Q4 remained at Amber. This is primarily due to the following factors: 1.Although the Full Business Case has been approved by cross-government stakeholders, and the contract now awarded to Leonardo Helicopters UK in March 2026, agreement was achieved months later than planned. 2.Other causes of this assessment are resourcing (including lack of resource loaded schedules) across the core programme and delivery teams, because of the delay to approving the Full Business Case.","startDate":"2021-04-30","endDate":"2037-05-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 30/09/2032.","fyBaseline":6.76,"fyForecast":5.84,"fyVariance":13.57,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. 1. Spend on infrastructure being lower than planned, due to pausing activity with a Technical Services Provider to refresh the user requirements following uncertainty with progressing options while the Full Business Case was still awaiting an approval.","wholeLifeCost":1404.92,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) increased from £1222.09M to £1574.04M. This is primarily due to the following factors. 1. Delay in approving the Full Business Case, and now reflecting a new 10-year provision, starting in Financial Year 26/27 (The Outline Business Case provision ended in 31/32). 2. There is also a longer initial support provision when compared to the Outline Business Case Whole Life Cost estimates.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 24/25-Q4, the NISTA/SRO Delivery Confidence Assessment rating at 25/26-Q4 remained at Amber. This is primarily due to the following factors: 1.Although the Full Business Case has been approved by cross-government stakeholders, and the contract now awarded to Leonardo Helicopters UK in March 2026, agreement was achieved months…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"MOD_0125_2021-Q4","year":2025,"name":"NEW MEDIUM HELICOPTER","department":"MoD","category":"Military Capability","description":"The New Medium Helicopter programme intends to rationalise up to three rotary wing requirements under one aircraft-type. This approach will maximise commonality allowing improvements in efficiency and operational flexibility. The user requires a multi-role platform to operate in all environments in support of Defence tasks and across a spectrum of threats. An open systems architecture is required to allow for rapid employment of different role-fits and carry-on equipment. This will enable efficient future development to meet the demands of a changing threat environment.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 increased from GREEN to AMBER. This is primarily due to the following factors. The Amber rating reflects challenges with workforce shortfalls across the core programme and delivery teams, and uncertainty about the outcome of the competition.","startDate":"2021-04-30","endDate":"2032-09-30","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 30/09/2032. The schedule will be further developed after completion of the New Medium Helicopter competition.","fyBaseline":6.58,"fyForecast":5.3,"fyVariance":19.5,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. Spend on infrastructure being lower than planned, due to Defence financial challenges and internal spend commitment controls.","wholeLifeCost":1222.09,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 1329 to 1222. This is primarily due to the following factors. Allocating some funding to support procurement of Airbus Jupiter HC Mk 2 (H145) helicopters for Brunei and Cyprus.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 increased from GREEN to AMBER. This is primarily due to the following factors. The Amber rating reflects challenges with workforce shortfalls across the core programme and delivery teams, and uncertainty about the outcome of the competition. Compared to financial year…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":1704,"attentionScore":43,"attentionReasons":["Current published delivery confidence is Amber","Published end date moved 1,704 days later","In-year forecast variance is +13.6%"]},{"id":"DECC_0005_1112-Q1","year":2026,"name":"GEOLOGICAL DISPOSAL FACILITY","department":"DESNZ","category":"Infrastructure and Construction","description":"A GDF provides an internationally recognised, safe, and permanent solution for the UK’s most hazardous radioactive waste. As a nationally significant infrastructure programme a GDF will also provide an opportunity to sustainably boost the local economy of the host community to transform itself for many generations. The programme also supports the delivery of the UK’s nuclear new build programme.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 the NISTA Delivery confidence assessment (DCA) rating at 25/26 remained at 'Red'. This is primarily due to the following factors, withdrawal of one of the remaining three community partnerships reducing the portfolio diversity, outcome of the full spending review settlement resulting in reduced programme scope delivery over the next few years and deferral of critical path activities in the move to the next phase. An action plan is in place to address the next steps as identified.","startDate":"2008-06-12","endDate":null,"scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date remains in the range 2050-2060. This is primarily due to the following factors‚ the programme has continued to progress the site evaluation and community willingness activities during 25/26. The programme continues to prioritise activities in line with the available SR settlement funding.","fyBaseline":90.86,"fyForecast":71.13,"fyVariance":21.71,"varianceNarrative":"The in-year budget variance this year is greater than minus 5% compared to the budget with underspend due to the outcome of the spending review settlement for 25/26 and further requests for budget reduction in line with other NDA group prioritisation and efficiencies. The main variance to the budget spend in year was due closure of the Theddlethorpe Community Partnership in June 2025. Further reductions in internal spend were due to mutually agreed voluntary exit and associated slowdown in external spend to align with the overall SR settlement.","wholeLifeCost":null,"costNarrative":"The project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) remains in the range of £20,300m to £53,300m at 17/18 money values. This is primarily due to the following factors: the programme is at an early stage of development, and the range reflects the uncertainty of the programme associated with potential host site, geology and technical requirements.","benefits":null,"benefitsNarrative":"As the programme is at such an early stage there are currently no baselined monetised benefits. The benefits of a GDF are wide-ranging and will span many future generations, they all into four main categories: 1) It is an essential environmental protection project – finally disposing of legacy most hazardous radioactive waste and providing a safe permanent solution. 2) Enabling the completion of the NDA decommissioning mission across the NDA Group – avoiding the very significant costs and risks of keeping the waste safe and secure in storage facilities above ground for many thousands of years. 3) An enabler for nuclear new build. 4) Significant host community benefits – transformational opportunity by creating thousands of jobs, a highly skilled local workforce, and business opportunities for more than 100 years. The near-term community benefits continue to be delivered with over £14m of Community Investment funding awarded across the Community Partnerships formed to date.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 the NISTA Delivery confidence assessment (DCA) rating at 25/26 remained at 'Red'. This is primarily due to the following factors, withdrawal of one of the remaining three community partnerships reducing the portfolio diversity, outcome of the full spending review settlement resulting in reduced programme scope delivery over…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"DECC_0005_1112-Q1","year":2020,"name":"Geological Disposal Facility Programme (GDF)","department":"BEIS","category":"Infrastructure and Construction","description":"To site and construct a Geological Disposal Facility for the disposal for higher activity radioactive waste.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber, which has not changed since last year�s Q2 1819 Amber, due primarily to the following factors; - This is a long term programme and uncertainties and risks still remain, including the ability to attract and secure a willing GDF host community reflecting the continued amber assessment. - As the programme progresses the uncertainties associated with the number of communities, GDF solutions, location(s), extent of the geological characterisation and the nature of the design solutions will be resolved, however this will take a number of years. Since the Q2 1920 (30th September 2019) Amber IPA DCA, the following non-project operating environment activities have impacted the original Q2 IPA DCA; - The siting process is in progress following launch in December 2018 and continues to be one of the main activities during this phase of the programme, relying on the approach from volunteer communities. Since the Q2 1920 (30th September 2019) Amber IPA DCA, the following primary project actions have impacted the original Q2 IPA DCA; - The programme has received approval to proceed with community engagement, disbursement of investment funding and site evaluation, a significant move to the next stage of the programme. - The programme and business transformation activities continue to move towards a delivery organisation in support of the move from policy development to siting and community engagement.","startDate":"2008-06-30","endDate":"2040-12-31","scheduleNarrative":"The scheduled baseline project end date at Q2 1920 (30th September 2019) is 31/12/40, has not changed since last year's Q2 1819 date of 31/12/40, due primarily to the following factors; - Schedule remains in line with the ambition to identify the location for, design and construct a geological disposal facility by the 2040's. - Delivery continues in line with the schedule, progressing as planned to secure approval to proceed with the current phase and development of the next phase, however progress is influenced by the levels of community engagement and pace of progress to form working groups. Since the Q2 1920 (30th September 2019) baseline project end date of 31/12/40, the following non-project operating environment activities have impacted the original Q2 baseline project end date; - The ambition remains, although there is ongoing uncertainty due to the volunteer approach and hence the location, geology and design for the facility. Since the Q2 1920 (30th September 2019) baseline project end date of 31/12/40, the following primary project actions have impacted the original Q2 baseline project end date; - Further engagement activity and pro-active stakeholder events are in progress to identify and encourage the next wave of interested communities in line with the project delivery ambitions. - Organisational transformation, strengthening of capability and capacity increase is in progress to meet the demands of the schedule.","fyBaseline":46.52,"fyForecast":46.52,"fyVariance":0.0,"varianceNarrative":"Budget variance less than 5%","wholeLifeCost":12743.0,"costNarrative":"The baseline Whole Life Cost at Q2 1920 (30th September 2019) is �12,743.00 m, has increased by �399.04 m since last year's Q2 1819 (�m) baseline Whole Life Cost of �12,343.96 m, due primarily to the following factors; - The increase in costs since last year are primarily down to inflation and revised assumptions during the siting and construction phases. All figures are provided in real rather than nominal values due to the long timescales associated with this programme. - It does not include any provision for waste disposal from a new nuclear build programme, as this will be funded by new nuclear operators. Since the Q2 1920 (30th September 2019) �12,743.00 m baseline Whole Life Cost, the following non-project operating environment activities have impacted the original baseline Q2 Whole Life Cost; - The Whole Life Cost figure represents the estimated cost of designing, constructing and operating the GDF out to the 2130s. Note that the figure reported here only relates to a GDF for legacy waste and waste arising from the existing fleet of nuclear reactors. - In line with other Government programmes at an early stage of development, the estimate does not include any allowance for risk, uncertainty or optimism bias. Since the Q2 1920 (30th September 2019) �12,743.00 m baseline Whole Life Cost, the following primary project actions have impacted the original Q2 baseline Whole Life Cost; - The Business Case to proceed with community engagement, disbursement and site evaluation has received approval and has commenced. - The next phase of the programme which will include geological characterisation, community engagement, solution development, technical design, delivery partner engagement and early procurements is in the early stages of development which will inform the Whole Life Cost.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Scope & requirements"],"evidenceExcerpt":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber, which has not changed since last year�s Q2 1819 Amber, due primarily to the following factors; - This is a long term programme and uncertainties and risks still remain, including the ability to attract and secure a willing GDF host community reflecting the…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2020","sourceLabel":"IPA Annual Report 2019-20"},{"id":"DECC_0005_1112-Q1","year":2021,"name":"Geological Disposal Facility Programme (GDF)","department":"BEIS","category":"Infrastructure and Construction","description":"The primary objective of the programme is to site and construct a permanent geological disposal facility (GDF) as the safe, secure and environmentally responsible solution to the long-term management of higher-activity radioactive waste in the UK, excluding Scotland. The programme also supports the delivery of the UK's nuclear new build programme because before development consents for new nuclear power stations are granted, the Government needs to be satisfied that effective arrangements exist or will exist to manage and dispose of the wastes they will produce.","ipaDca":"Green","sroDca":null,"deliveryConfidence":"Green","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating decreased from Amber to Green. This is primarily due to the following factors: The programme delivery confidence has moved to green in the period due to the progress in engaging volunteer communities; two working groups have been formed and additional interested parties are being actively engaged. The transformation of the Geological Disposal Facility (GDF) programme organisation continues with ongoing recruitment to meet the delivery needs however, there is still work to do on the detailed transformation planning considering the future changes at RWM to enact plans for the NDA's Single Waste Division. It should be noted that the GDF programme spans a significant time period on a whole life basis and the programme is still at a very early stage in the lifecycle, construction is due to start in the 2040s. The programme still faces exceptional uncertainty levels at this stage, with success dependent on agreeing a site within a willing community and the associated geological uncertainties this presents.","startDate":"2008-06-30","endDate":"2040-12-31","scheduleNarrative":"Compared to financial year 19/20-Q2, the project's end-date remained scheduled to finish on 31 December 2040 . This is primarily due to the following factors: Significant progress has been made over the past year and work continues to drive the schedule and mitigate risks to meet the delivery milestone dates. The first two working groups have been established enabling discussions to begin with potential host communities and pioneering research is underway to underpin delivery of the Geological Disposal Facility (GDF) including the testing of a new approach to the sealing of deep boreholes. The organisational transformation continues to enhance capability as the programme moves from research to delivery leading to enhanced planning for the GDF and additional engagement with regulators building confidence and maintaining a constructive dialogue. The programme also continues to progress risk mitigation activities and work has been launched to support the bring forward of seismic surveys in support of site evaluation, a key step in the overall GDF site selection process.","fyBaseline":48.47,"fyForecast":33.6,"fyVariance":-31.0,"varianceNarrative":"The budget variance exceeds 5%. The main variances and reduced in year spend are due to two main reasons: 1) There were delays to the initial launch of the siting process resulting in a fewer number of assumed / forecast working groups and the associated costs in this FYr. This position has started to improve as there are now two working groups in place. The difficulties associated with CoVID have reduced the planned stakeholder engagement and communication activities with an associated reduction in cost. 2) There have been delays in the technical work and associated spend; commencement of site evaluation works due to the delays in working group formation and search area agreement.","wholeLifeCost":12743.0,"costNarrative":"Compared to financial year 19/20-Q2, the projects Baseline Whole Life Cost remained at �12743.00m. This is primarily due to the following factors: The costs presented are only currently the Nuclear Decommissioning Authority (NDA) net costs for the Geological Disposal Facility (GDF) programme - the information on Whole Life Costs (WLC) is derived from figures used in NDA's 2018 Annual Report and Accounts (ARAC) scenario GDF cost estimate (in Sept 2018 money values). Note that the costs reported here only cover NDA costs related to a GDF for legacy waste and waste arising from the existing fleet of nuclear reactors, it does not include any provision for waste disposal from a new nuclear build programme, as this will be funded by new nuclear operators. In line with other Government programmes at an early stage of development, the WLC estimate does not include any allowance for risk, uncertainty or optimism bias. The estimate is being reviewed alongside the wider update of the programme business case which will be available in due course.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Technical & integration","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating decreased from Amber to Green. This is primarily due to the following factors: The programme delivery confidence has moved to green in the period due to the progress in engaging volunteer communities; two working groups have been formed and…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21"},{"id":"DECC_0005_1112-Q1","year":2022,"name":"Geological Disposal Facility Programme (GDF)","department":"BEIS","category":"Infrastructure and Construction","description":"The primary objective of the programme is to site and construct a permanent geological disposal facility (GDF) as the safe, secure and environmentally responsible solution to the long-term management of higher-activity radioactive waste in the UK, excluding Scotland. A GDF is the internationally agreed and only viable permanent answer to the UK's existing legacy of Highly radioactive waste. As a nationally significant infrastructure programme a GDF will also provide an opportunity to sustainably boost the economy of the host region and local community to transform itself for many generations. The programme also supports the delivery of the UK's nuclear new build programme as the Government needs to be satisfied that effective arrangements exist or will exist to manage and dispose of the wastes they will produce before development consents for new nuclear power stations are granted.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 increased from Green to Amber The SRO SQA has changed from green to amber due to ongoing funding constraints. The programme faces large uncertainties at this stage due to the site selection process; Until we confirm a willing community, a suitable site, and test the site characteristics, we cannot be confident of timescales and costs. - Uncertainty in finding a willing community continues to reduce as three Community Partnerships have now been formed and a working group progressing towards Community Partnership. There is a pipeline of further potential communities with good site prospects. - There has been considerable progress with enabling activities to support the current and next phases: business cases for major permissions work, and a property value protection scheme are in progress. Plans are underway to start seismic investigations of potential sites in Copeland. The transformation and capability build of the organisation continues with development to support seismic surveys and technical evaluation activities. Confidence in engaging volunteer communities has grown further with the formation of three community partnerships in West Cumbria and a fourth working group in East Lindsey. Active and focussed engagement continues with additional communities. The transformation of the GDF programme continues with ongoing capability development and recruitment to meet the changing nature of the programme preparing for the next significant phase - concept design and site suitability. The GDF is now part of the Major Capital Programmes Directorate of the newly formed NDA Nuclear Waste Services. It should be noted that the GDF programme spans a significant time period on a whole life basis and is still at a very early stage in the lifecycle, construction is due to start in the 2040s. The programme still faces exceptional uncertainty levels at this stage with success dependent on agreeing a site with a willing community and the associated complexity of geology.","startDate":"2008-06-30","endDate":"2040-12-31","scheduleNarrative":"Compared to 2021-Q4, your project end-date remained scheduled to finish on 31 DEC 2040 . This is primarily due to the following factors: Significant progress has been made during the financial year even with the ongoing constraints of CoVID and the associated impact for community engagement. However, many work-arounds have been effective in continuing engagement, noting that the communities set the pace for their own progress through the 'willing community' process. 3 community partnerships and now been formed and a fourth working group is preparing for Community Partnership formation and initial community investment grants have been approved. Work continues to progress on potential additional community working groups in particular for targeted community lead generation. The detailed preparations are underway for starting the first seismic surveys - Copeland summer 2022. The detailed planning and procurement processes are underway for the formal site evaluation of all current sites. The schedule remains on target for the first key decision point - site down selection in 25/26.","fyBaseline":52.03,"fyForecast":43.17,"fyVariance":-17.0,"varianceNarrative":"The budget variance exceeds 5%. The budget variance exceeds 5%. This is primarily due to the following factors resulting in a reduced spend in year: 1) Slower than anticipated progression of communities to form Working Groups and move to Community Partnerships. In addition, we have had fewer WGs and CPs being formed than assumed in the budget. Also, ongoing CoVID impacts with more virtual events scheduled over the year and the associated reduction in spend. 2) Budget constraints applied to the final quarter of the year have resulted in deferrals, including the next phase of the borehole sealing demonstration, and slow down in some of the technical support activities and associated reduction in spend. Decisions were taken to prioritise activities that support the critical and key paths to the first major decision point in 2025/26. Recruitment of resources required to deliver increased capability within the programme to support the next phases of work was paused.","wholeLifeCost":20300.0,"costNarrative":"Compared to2021-Q4, the projects Baseline Whole Life Cost increased from 12743.00 (£m) to 20300.00 (£m). This is primarily due to the following factors: The costs have been aligned with the HMG approved programme business case (Oct 2019). The revised Whole Life Cost (WLC) envelope includes a range of scenarios associated with the waste inventory and the significant levels of variability associated with the location and the possible geological complexities. Current estimates are between £10.2bn-£27.3bn cost to HMG (as stated in the Q3 report) to dispose of the legacy waste, rising to £20.3-£53.3bn (aligned to the 2019 approved FBC) for the whole inventory, including an allowance for risk and optimism bias. The non HMG costs will be covered mainly through the Funded Decommissioning Programme for new nuclear build projects. The WLC costs are spread over a period to c.2200.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 increased from Green to Amber The SRO SQA has changed from green to amber due to ongoing funding constraints. The programme faces large uncertainties at this stage due to the site selection process; Until we confirm a willing…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"DECC_0005_1112-Q1","year":2023,"name":"Geological Disposal Facility Programme (GDF)","department":"DESNZ","category":"Infrastructure and Construction","description":"The primary objective of the programme is to site and construct a permanent geological disposal facility (GDF) as the safe, secure and environmentally responsible solution to the long term management of higher activity radioactive waste in the UK excluding Scotland. A GDF is the internationally agreed and only viable permanent answer to the UK's existing legacy of Highly radioactive waste. As a nationally significant infrastructure programme a GDF will also provide an opportunity to sustainability boost the economy of the host region and local community to transform itself for many generations. The programme also supports the delivery of the UK's nuclear new build programme as the Government needs to be satisfied that effective arrangements exist or will exist to manage and dispose of the wastes they will produce before development consents for new nuclear power stations are granted.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber (IPA rating). This is primarily due to the following factors. Departmental narrative on schedule","startDate":"2008-06-30","endDate":"2050-03-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 increased from 2040-12-31 to 2050-03-31. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 increased from 2040-12-31 to 2050-03-31. This is primarily due to the following factors. The indicative project end date is that given for the first emplacement of legacy radioactive waste in the facility, aligned to the Tranche 3 sub programme business case; this includes updated timescales in the securing of willing communities, a better understanding of the full scope of work to characterise the sites through the drilling of deep boreholes and associated consents and permissions and a level of schedule risk and uncertainty.It should be noted that the programme continues to face large uncertainties at this stage due to the site selection process; confidence will increase as the potential site locations are down selected and fully characterised. The schedule remains on target for the first key decision point - site down selection in 2026.","fyBaseline":52.12,"fyForecast":66.1,"fyVariance":27.0,"varianceNarrative":"The budget variance exceeds 5%. The budget variance exceeds 5%. This is primarily due to the following factors resulting in additional spend in year: 1) A case was made to bring forward the seismic survey for Copeland in order to support the site evaluation and characterisation which was completed during the financial year, in addition the opportunity has been taken to procure existing information to further inform site evaluation and characterisation at other sites. 2) Ongoing progress of community partnerships and the utilisation of the Community Investment Funding, recovering some of the activities that were constrained due COVID impacts in prior years.","wholeLifeCost":20300.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 remained at 20300m. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 remained at 20300m. This is primarily due to the following factors. The whole life costs align with those approved in the Programme Level Business Case. The WLC costs presented in the GMPP report cover both the HMG and non-HMG costs to the programme and are the lower bound estimate within the business case. The lower bound 20.3bn covers the lower technical complexity of the GDF site construction and includes legacy waste, waste from new nuclear and other potential materials. The upper bound of the business case 53.3bn includes for a higher technical complexity GDF construction site, contingency, optimism bias and uncertainty.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. The project did not provide departmental-agree monetised benefits at 22/23-Q4. As a nationally significant infrastructure project which will span decades, a GDF will also provide a unique opportunity to sustainably boost the economy of the host region and local community to transform itself for many generations. The benefits of a GDF are wide-ranging and will span many future generations, they fall into four main categories: 1. It is an essential environmental protection project - finally disposing of legacy radioactive waste and providing a safe, permanent solution.2. Enabling the completion of the NDA decommissioning mission across the NDA Group and in particular Sellafield - avoiding the very significant costs and risks of keeping the waste safe and secure in storage facilities above ground for many thousands of years.3. A key enabler for nuclear new build contributing to the British Energy Security Strategy and net-zero 2050 .4. Significant host community benefits - a transformational opportunity by creating thousands of jobs, a highly skilled local workforce, and business opportunities for more than 100 years as presented in the GDF Creating Jobs & Skills report as well infrastructure investment and community support.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Technical & integration"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber (IPA rating). This is primarily due to the following factors. Departmental narrative on schedule Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 increased from 2040-12-31 to 2050-03-31. This is primarily due to the following…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"DECC_0005_1112-Q1","year":2024,"name":"Geological Disposal Facility Programme (GDF)","department":"DESNZ","category":"Infrastructure and Construction","description":"The primary objective of the programme is to site and construct a permanent geological disposal facility (GDF) as the safe, secure and environmentally responsible solution to the long term management of higher activity radioactive waste in the UK excluding Scotland. A GDF is the internationally agreed and only viable permanent answer to the UK's existing legacy of Highly radioactive waste. As a nationally significant infrastructure programme a GDF will also provide an opportunity to sustainably boost the economy of the host region and local community to transform itself for many generations. The programme also supports the delivery of the UK's nuclear new build programme as the Government needs to be satisfied that effective arrangements exist or will exist to manage and dispose of the wastes they will produce before development consents for new nuclear power stations are granted.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The DCA of amber reflects the uncertainty in the project at this time. There is still considerable uncertainty with the site locations, associated geology and technical feasibility as the programme moves towards the next phase as communities are selected to move to detailed site investigations or exited from the process. The programme continues to make good progress within this phase of community engagement and site evaluation across the main factors of willing community, suitable site and programme deliverability, in line with the Working With Communities Policy with the 3 existing Community Partnerships.","startDate":"2008-06-30","endDate":"2050-03-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2050-03-31. This is primarily due to the following factors. The indicative project end date is that given for the First Waste Emplacement of legacy radioactive waste in the facility, aligned to the Tranche 3 sub programme business case; this includes updated timescales in the securing of willing communities, a better understanding of the full scope of work to characterise the sites through the drilling of deep geological boreholes and associated consents and permissions and a level of schedule risk and uncertainty. It should be noted that the programme continues to face considerable uncertainties at this stage due to the site selection process; confidence will increase as the potential site locations are down selected and fully characterised. The schedule remains on target for the first key decision point - selection of preferred site(s) in 2026.","fyBaseline":52.12,"fyForecast":52.12,"fyVariance":0.0,"varianceNarrative":"The budget variance is inferior or equal to 5%.","wholeLifeCost":20300.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 remained at 20300m. This is primarily due to the following factors. The whole life costs align with those approved in the Programme Level Business Case (at 17/18 money values). The WLCs presented in the GMPP report cover both the HMG & non-HMG costs to the programme and are the lower bound estimate within the business case. The lower bound 20.3bn covers the lower possible technical complexity of the GDF site construction and includes provision for legacy waste, waste from new nuclear (16GWe) and other potential materials. The upper bound of the business case 53.3bn includes for higher technical complexity in the GDF construction site, contingency, optimism bias and uncertainty. As we move to preferred sites the level of uncertainty will significantly reduce.","benefits":0.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 0m. As a nationally significant infrastructure project which will span decades, a GDF will also provide a unique opportunity to sustainably boost the economy of the host region and local community to transform itself for many generations. The benefits of a GDF are wide-ranging and will span many future generations, they fall into four main categories: 1. It is an essential environmental protection project - finally disposing of legacy radioactive waste and providing a safe, permanent solution. 2. Enabling the completion of the NDA decommissioning mission across the NDA Group and in particular Sellafield - avoiding the very significant costs and risks of keeping the waste safe and secure in storage facilities above ground for many thousands of years. 3. A key enabler for nuclear new build - contributing to the British Energy Security Strategy and net-zero 2050 . 4. Significant host community benefits - a transformational opportunity by creating thousands of jobs, a highly skilled local workforce, and business opportunities for more than 100 years as presented in the GDF - Creating Jobs & Skills report as well infrastructure investment and community support.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Technical & integration"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The DCA of amber reflects the uncertainty in the project at this time. There is still considerable uncertainty with the site locations, associated geology and…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"DECC_0005_1112-Q1","year":2025,"name":"GEOLOGICAL DISPOSAL FACILITY","department":"DESNZ","category":"Infrastructure and Construction","description":"The primary objective of the programme is to site and construct a permanent geological disposal facility (GDF) as the safe, secure and environmentally responsible solution to the long term management of higher activity radioactive waste in the UK excluding Scotland. A GDF is the internationally agreed and only viable permanent answer to the UK’s existing legacy of Highly radioactive waste. As a nationally significant infrastructure programme a GDF will also provide an opportunity to sustainably boost the economy of the host region and local community to transform itself for many generations. The programme also supports the delivery of the UK’s nuclear new build programme as the Government needs to be satisfied that effective arrangements exist or will exist to manage and dispose of the wastes they will produce before development consents for new nuclear power stations are granted.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 changed from AMBER to RED. This is primarily due to the following factors‚ The IPA review during January 25, and associated RED rating, reflects the unaffordability of the GDF Programme, with particular reference to the Preparations for Detailed Site Investigations OBC in respect of the forecast financial case and the 25/26 SR settlement. The programme continues to progress and will update the delivery plan to take account of the outcome of the upcoming Spending Review, protecting as far possible, the critical path, reducing uncertainty and mitigating the key risks. The four key programme objectives continue to be delivered by the programme.","startDate":"2008-06-30","endDate":"2050-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2050. This is primarily due to the following factors‚ There is no change at the end of 24/25 to the current forecast project end date. The programme continues to reduce uncertainties of delivery. The critical path has been held following the 25/26 SR settlement through prioritisation of activities.","fyBaseline":83.33,"fyForecast":75.19,"fyVariance":9.77,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ A number of factors have reduced the spend against budget for the year, these include 1) a decision to postpone the establishment of a further working group, 2) uncertainty & risk associated with one of the communities staying in the process and hence deferral of significant long term financial commitments 3) slow down in procurement activities based on reduced SR budget funding for 25/26 and projected future flat line SR funding and 4) slow down in recruitment (internal staff costs) to align with 25/26 SR settlement and anticipated overall budget reduction in the SR period.","wholeLifeCost":null,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 20300. This is primarily due to the following factors‚ There is currently no change to the Whole Life Cost Range for the programme which is £20.3bn to £53.3bn (2017/18 money values). This range reflects the uncertainty of the programme associated with potential host site, geology and technical requirements. The impacts of the Spending Review and other changes will be reflected in an update to the Programme Level Business Case during early 2026.","benefits":null,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ As a nationally significant infrastructure project which will span decades, a GDF will also provide a unique opportunity to sustainability boost the economy of the host region and local community to transform itself for many generations. The benefits of a GDF are wide-ranging and will span many future generations, they all into four main categories: 1) It is an essential environmental protection project – finally disposing of legacy radioactive waste and providing a safe permanent solution. 2) Enabling the completion of the NDA decommissioning mission across the NDA Group and in particular Sellafield – avoiding the very significant costs and risks of keeping the waste safe and secure in storage facilities above ground for many thousands of years. 3) A key enabler for nuclear new build – contributing to the British Energy Security Strategy & Net Zero 2050. 4) Significant host community benefits – transformational opportunity by creating thousands of jobs, a highly skilled local workforce, and business opportunities for more than 100 years as presented in the GDF – Creatin Jobs & Skills report as well infrastructure investment and community support. The short-term community benefits continue to be delivered with over £12m of grant funding awarded across the Community Partnerships. In the next phase, the preferred site(s) will become eligible for annual grant awards of £2.5m per CP (Q1 26/27).","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 changed from AMBER to RED. This is primarily due to the following factors‚ The IPA review during January 25, and associated RED rating, reflects the unaffordability of the GDF Programme, with particular reference to the Preparations…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"DECC_0005_1112-Q1","year":2026,"name":"GEOLOGICAL DISPOSAL FACILITY","department":"DESNZ","category":"Infrastructure and Construction","description":"A GDF provides an internationally recognised, safe, and permanent solution for the UK’s most hazardous radioactive waste. As a nationally significant infrastructure programme a GDF will also provide an opportunity to sustainably boost the local economy of the host community to transform itself for many generations. The programme also supports the delivery of the UK’s nuclear new build programme.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 the NISTA Delivery confidence assessment (DCA) rating at 25/26 remained at 'Red'. This is primarily due to the following factors, withdrawal of one of the remaining three community partnerships reducing the portfolio diversity, outcome of the full spending review settlement resulting in reduced programme scope delivery over the next few years and deferral of critical path activities in the move to the next phase. An action plan is in place to address the next steps as identified.","startDate":"2008-06-12","endDate":null,"scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date remains in the range 2050-2060. This is primarily due to the following factors‚ the programme has continued to progress the site evaluation and community willingness activities during 25/26. The programme continues to prioritise activities in line with the available SR settlement funding.","fyBaseline":90.86,"fyForecast":71.13,"fyVariance":21.71,"varianceNarrative":"The in-year budget variance this year is greater than minus 5% compared to the budget with underspend due to the outcome of the spending review settlement for 25/26 and further requests for budget reduction in line with other NDA group prioritisation and efficiencies. The main variance to the budget spend in year was due closure of the Theddlethorpe Community Partnership in June 2025. Further reductions in internal spend were due to mutually agreed voluntary exit and associated slowdown in external spend to align with the overall SR settlement.","wholeLifeCost":null,"costNarrative":"The project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) remains in the range of £20,300m to £53,300m at 17/18 money values. This is primarily due to the following factors: the programme is at an early stage of development, and the range reflects the uncertainty of the programme associated with potential host site, geology and technical requirements.","benefits":null,"benefitsNarrative":"As the programme is at such an early stage there are currently no baselined monetised benefits. The benefits of a GDF are wide-ranging and will span many future generations, they all into four main categories: 1) It is an essential environmental protection project – finally disposing of legacy most hazardous radioactive waste and providing a safe permanent solution. 2) Enabling the completion of the NDA decommissioning mission across the NDA Group – avoiding the very significant costs and risks of keeping the waste safe and secure in storage facilities above ground for many thousands of years. 3) An enabler for nuclear new build. 4) Significant host community benefits – transformational opportunity by creating thousands of jobs, a highly skilled local workforce, and business opportunities for more than 100 years. The near-term community benefits continue to be delivered with over £14m of Community Investment funding awarded across the Community Partnerships formed to date.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 the NISTA Delivery confidence assessment (DCA) rating at 25/26 remained at 'Red'. This is primarily due to the following factors, withdrawal of one of the remaining three community partnerships reducing the portfolio diversity, outcome of the full spending review settlement resulting in reduced programme scope delivery over…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"DECC_0005_1112-Q1","year":2025,"name":"GEOLOGICAL DISPOSAL FACILITY","department":"DESNZ","category":"Infrastructure and Construction","description":"The primary objective of the programme is to site and construct a permanent geological disposal facility (GDF) as the safe, secure and environmentally responsible solution to the long term management of higher activity radioactive waste in the UK excluding Scotland. A GDF is the internationally agreed and only viable permanent answer to the UK’s existing legacy of Highly radioactive waste. As a nationally significant infrastructure programme a GDF will also provide an opportunity to sustainably boost the economy of the host region and local community to transform itself for many generations. The programme also supports the delivery of the UK’s nuclear new build programme as the Government needs to be satisfied that effective arrangements exist or will exist to manage and dispose of the wastes they will produce before development consents for new nuclear power stations are granted.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 changed from AMBER to RED. This is primarily due to the following factors‚ The IPA review during January 25, and associated RED rating, reflects the unaffordability of the GDF Programme, with particular reference to the Preparations for Detailed Site Investigations OBC in respect of the forecast financial case and the 25/26 SR settlement. The programme continues to progress and will update the delivery plan to take account of the outcome of the upcoming Spending Review, protecting as far possible, the critical path, reducing uncertainty and mitigating the key risks. The four key programme objectives continue to be delivered by the programme.","startDate":"2008-06-30","endDate":"2050-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2050. This is primarily due to the following factors‚ There is no change at the end of 24/25 to the current forecast project end date. The programme continues to reduce uncertainties of delivery. The critical path has been held following the 25/26 SR settlement through prioritisation of activities.","fyBaseline":83.33,"fyForecast":75.19,"fyVariance":9.77,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ A number of factors have reduced the spend against budget for the year, these include 1) a decision to postpone the establishment of a further working group, 2) uncertainty & risk associated with one of the communities staying in the process and hence deferral of significant long term financial commitments 3) slow down in procurement activities based on reduced SR budget funding for 25/26 and projected future flat line SR funding and 4) slow down in recruitment (internal staff costs) to align with 25/26 SR settlement and anticipated overall budget reduction in the SR period.","wholeLifeCost":null,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 20300. This is primarily due to the following factors‚ There is currently no change to the Whole Life Cost Range for the programme which is £20.3bn to £53.3bn (2017/18 money values). This range reflects the uncertainty of the programme associated with potential host site, geology and technical requirements. The impacts of the Spending Review and other changes will be reflected in an update to the Programme Level Business Case during early 2026.","benefits":null,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ As a nationally significant infrastructure project which will span decades, a GDF will also provide a unique opportunity to sustainability boost the economy of the host region and local community to transform itself for many generations. The benefits of a GDF are wide-ranging and will span many future generations, they all into four main categories: 1) It is an essential environmental protection project – finally disposing of legacy radioactive waste and providing a safe permanent solution. 2) Enabling the completion of the NDA decommissioning mission across the NDA Group and in particular Sellafield – avoiding the very significant costs and risks of keeping the waste safe and secure in storage facilities above ground for many thousands of years. 3) A key enabler for nuclear new build – contributing to the British Energy Security Strategy & Net Zero 2050. 4) Significant host community benefits – transformational opportunity by creating thousands of jobs, a highly skilled local workforce, and business opportunities for more than 100 years as presented in the GDF – Creatin Jobs & Skills report as well infrastructure investment and community support. The short-term community benefits continue to be delivered with over £12m of grant funding awarded across the Community Partnerships. In the next phase, the preferred site(s) will become eligible for annual grant awards of £2.5m per CP (Q1 26/27).","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 changed from AMBER to RED. This is primarily due to the following factors‚ The IPA review during January 25, and associated RED rating, reflects the unaffordability of the GDF Programme, with particular reference to the Preparations…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":null,"attentionScore":42,"attentionReasons":["Current published delivery confidence is Red","In-year forecast variance is +21.7%"]},{"id":"MOD_0115_1718-Q2","year":2026,"name":"MECHANISED INFANTRY PROGRAMME","department":"MOD","category":"Military Capability","description":"The Mechanised Infantry Boxer Programme will deliver modern wheeled Armoured Personnel Carriers and an Armoured Fighting Vehicle modular, common base platform that can perform a range of roles across a modernised Army. The vehicles will be a significant contribution to enabling a highly deployable, networked force to operate differently from conventional industrial age combat forces, offering unique competitive advantage whether fighting, peacekeeping or delivering humanitarian aid.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is due to the following factors. 1. This is predominantly driven by global supply chain issues following the war in Ukraine, and Covid, which are not unique to Defence or Boxer but impacts at a key point of vehicle manufacture. 2. The programme’s Initial Operating Capability is delayed with increased risks requiring strong management action, and has been reapproved but not yet published, pending the Defence Investment Plan. 3. The lead contractors of ARTEC, Rheinmetall, and Krauss Maffei Wegmann Nexter Defence Systems (KNDS) have not yet stabilised or fully resolved their ongoing supply chain delays to vehicle production, which is also impacting other areas including support and training.","startDate":"2017-10-27","endDate":"2033-09-09","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 31/3/2033. This is primarily due to the following factors. 1. This year the Initial Operating Capability schedule forecast was delayed as no longer achievable due to supply chain delays impacting delivery and formally reapproved through Review Note 5. 2. This has been further reviewed as the required Collective Training alongside Ajax in Armoured Infantry Brigades is currently impacted by the Ajax pause and alternate training options in the same timeframe were not viable or meaningful. Boxer Collective Training to achieve Initial Operating Capability is being reset and decoupled from Ajax to de-risk this whilst Wavell Structures are matured and joint training will follow; subject to Ajax outcomes.","fyBaseline":529.7,"fyForecast":242.23,"fyVariance":54.27,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. 1. This variance was largely due to delays to vehicle deliveries, Bowman Government Furnished Equipment, Special Tools and Test Equipment and delays in Requests for Quotation for new items and training aids.","wholeLifeCost":5033.66,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) decreased from £7009.30M to £5150.92M. This is primarily due to the following factors. 1. The Programme Whole Life Cost Budget (not cost) to Full Operating Capability has decreased since Q4 24/25 as a consequence of funding removal following Army re-prioritisation of further procurements and Defence Investment Plan Outcomes. 2. There is an ongoing conversation with industry on treatment of contractual VoP (Variation of Price), caused by inflationary supply chain pressures which are also awaiting the Defence Investmetn Plan.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Workforce & capability","Commercial & supply chain","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is due to the following factors. 1. This is predominantly driven by global supply chain issues following the war in Ukraine, and Covid, which are not unique to Defence or Boxer but impacts at a key point of vehicle manufacture.…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"MOD_0115_1718-Q2","year":2020,"name":"Mechanised Infantry Programme","department":"MOD","category":"Military Capability","description":"Delivers agile Mechanised Infantry able to operate at reach, at speed, in complex terrain and with low logistic need.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber, which has not changed since last year�s Q2 1819 Amber, due primarily to the following factors; - The schedule remained stable and unchanged between Q2 18/19 and Q2 19/20 - MIV remained on course for a Main Gate Business Case submission and approval in line with the schedule between Q2 18/19 and Q2 19/20 Since the Q2 1920 (30th September 2019) Amber IPA DCA, the following non-project operating environment activities have impacted the original Q2 IPA DCA; - There have been no relevant external factors which have impacted the original DCA. Since the Q2 1920 (30th September 2019) Amber IPA DCA, the following primary project actions have impacted the original Q2 IPA DCA; - The Mech Inf Main Gate Business Case was approved in Q4 Calendar Year 2019 which improved the DCA from AMBER to AMBER/GREEN - The prime contact was signed with ARTEC (Original Equipment Manufacturer) via OCCAR (Organisation Conjointe de Coop�ration en mati�re d'Armement - the international organisation through which procurement is taking place) at the end of Q4 calendar year 2019.","startDate":"2018-04-02","endDate":"2032-12-31","scheduleNarrative":"The scheduled project end date at Q2 1920 (30th September 2019) is 31/12/32, due primarily to the following factors; - Full Operating Capability will be achieved by 2032, including the delivery of all platforms on contract. Since the Q2 1920 (30th September 2019) baseline project end date of 31/12/32, the following non-project operating environment activities have impacted the original Q2 baseline project end date; - There have been no relevant external factors which have impacted the project end date - it remains as provided in the Main Gate Business Case. Since the Q2 1920 (30th September 2019) baseline project end date of 31/12/32, the following primary project actions have impacted the original Q2 baseline project end date; - The baseline project end date remains extant. - Design work is continuing as planned. Covid 19 has yet to have a clear impact, but we are monitoring the situation closely.","fyBaseline":7.84,"fyForecast":8.16,"fyVariance":4.0,"varianceNarrative":"Budget variance less than 5%","wholeLifeCost":4663.31,"costNarrative":"The baseline Whole Life Cost at Q2 1920 (30th September 2019) is �4,663.31 m, due primarily to the following factors; - This reflects the forecast cost as at Sep 2019 following industry responses to Request For Quotations (RFQ) and continued negotiations. - The forecast cost is in line with the scope approved in the Initial Gate Business Case (IGBC) Since the Q2 1920 (30th September 2019) �4,663.31 m baseline Whole Life Cost, the following non-project operating environment activities have impacted the original baseline Q2 Whole Life Cost; - No operating environment factors have impacted on WLCs. Covid 19 has not yet impacted programme costs and activity continues on time and to budget. Since the Q2 1920 (30th September 2019) �4,663.31 m baseline Whole Life Cost, the following primary project actions have impacted the original Q2 baseline Whole Life Cost; - The ruling that VAT costs could be returned to the project, received in Q1 CY 2020, has reduced funding by c�456m. - No significant project actions have impacted on WLCs.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Commercial & supply chain"],"evidenceExcerpt":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber, which has not changed since last year�s Q2 1819 Amber, due primarily to the following factors; - The schedule remained stable and unchanged between Q2 18/19 and Q2 19/20 - MIV remained on course for a Main Gate Business Case submission and approval in line with…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2020","sourceLabel":"IPA Annual Report 2019-20"},{"id":"MOD_0115_1718-Q2","year":2021,"name":"Mechanised Infantry Programme","department":"MOD","category":"Military Capability","description":"The Mechanised Infantry Programme will deliver modern wheeled Armoured Personnel Carriers that can perform a range of roles to support the Infantry, Combat Support, and Combat Service Support elements across new Brigade Combat Teams - a new concept emerging from the Integrated Review. The vehicles will be a significant contributuion to enabling a highly deployable, networked force to operate differently from conventional industrial age combat forces, offering unique competitive advantage whether fighting, peacekeeping or delivering humanitarian aid.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating decreased from Amber to Amber/Green. This is primarily due to the following factors: The September 2019 Infrastructure and Projects Authority report recommended the Delivery Confidence Assessment should be Amber Green if the Main Gate Business Case approval was achieved by the end of that year, which it was. Subsequently, the Programme is progressing well. Further opportunity to accelerate, uplift and enhance the programme to implement Integrated Review decisions are being explored, and will be added to the programme baseline when finalised and approved. An export bid is also being explored jointly with industry and wider government.","startDate":"2017-10-27","endDate":"2032-12-31","scheduleNarrative":"Compared to financial year 19/20-Q2, the project's end-date remained scheduled to finish on 31 December 2032 . This is primarily due to the following factors:","fyBaseline":68.44,"fyForecast":123.52,"fyVariance":80.0,"varianceNarrative":"The budget variance exceeds 5%. The quoted figures relate to the approved approved Whole Life Costs to 32/33. The main changes are the re profiling adjustments made within the financial year as follows: Reprofiling declared at Programme Cost Review 2, 2020 and remainder at Accounting Period 0, 2020/21. ARTEC BOXER Production Contract - Reprofile of funding to Financial Year 2020/21 previously profiled in future years. This is due to more accurate task level information supplied by the contractor following contract award Re-profile of ARTEC forecast following provision of further refined Earned Value Management data from industry showing accruals profile updated for realism and accuracy. Key activities now profiled in year include Critical Design Review, Manufacturing Management and Technical Decision support","wholeLifeCost":3963.56,"costNarrative":"Compared to financial year 19/20-Q2, the projects Baseline Whole Life Cost decreased from 4663.30m to �3963.56m. This is primarily due to the following factors: The Whole Life Budget c.�4Bn is for the Main Gate Approved period to 32/33. It includes Approved, Unapproved values and sunk costs. The VAT element was removed from the profile and the Annual Budgeting Limits adjusted to reflect this adjustment. To note, the whole life costs for the programme have not increased as a result of this change.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Approvals & decisions","Governance & assurance","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating decreased from Amber to Amber/Green. This is primarily due to the following factors: The September 2019 Infrastructure and Projects Authority report recommended the Delivery Confidence Assessment should be Amber Green if the Main Gate Business…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21"},{"id":"MOD_0115_1718-Q2","year":2022,"name":"Mechanised Infantry Programme","department":"MOD","category":"Military Capability","description":"The Mechanised Infantry Programme will deliver modern wheeled Armoured Personnel Carriers that can perform a range of roles to support the Infantry, Combat Support, and Combat Service Support elements across new Brigade Combat Teams - a new concept emerging from the Integrated Review. The vehicles will be a significant contribution to enabling a highly deployable, networked force to operate differently from conventional industrial age combat forces, offering unique competitive advantage whether fighting, peacekeeping or delivering humanitarian aid.","ipaDca":"Green","sroDca":null,"deliveryConfidence":"Green","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating increased from Amber/Green to Green. This is primarily due to the following factors: The removal of the incremental Amber/Green and Amber/Red assessment ratings. Overall there is strong strategic alignment and high level support, good progress and confidence in achieving the Approved Programme baseline at P50. Defence Equipment & Support and industry are experiencing some delivery delay against the contracted (deterministic) baseline, however this remains within the approved risk adjusted 50% schedule. There are some challenging issues in the global supply chain from both COVID and more recently global events, which are not unique to Boxer and could impact commercial and defence industry generally.","startDate":"2017-10-27","endDate":"2033-03-31","scheduleNarrative":"Compared to 2021-Q4, the project end-date increased from 31 December 32 to 31 March 33. This is primarily due to the following factors: Earlier forecasts were that delivery would be achieved well ahead of approved baseline schedule, however current delays are eating into this but it remains within the 50% approval, pending some recovery action plans with industry. Defence Equipment & Support and industry are experiencing some delivery delay against the contracted (deterministic) baseline, however this remains within the approved risk adjusted 50% schedule. There are some challenging issues in the global supply chain from both COVID and more recently global events, which are not unique to Boxer and could impact commercial and defence industry generally. There is strong collaboration across MOD, Industry and Allies working collaboratively to understand and mitigate these potential issues.","fyBaseline":137.66,"fyForecast":105.44,"fyVariance":-23.0,"varianceNarrative":"The budget variance exceeds 5%. Most of the variance is due to favourable Euro foreign exchange rates, retirement of design and development risk and uncertainty given demonstration phase progress, lower expenditure on Government Furnished Equipment (being delayed to future years with interim solutions for Interim Operating Capability) and increased in year vehicle manufacture activity compared to initial forecast.","wholeLifeCost":6575.0,"costNarrative":"Compared to financial year 20/21-Q4, the projects Baseline Whole Life Cost increased from £3963.56m to £6575.172m. This is primarily due to the following factors: The Defence in a Competitive Age Command Paper (CP411) published in March 2021 confirmed that the Army will be able to invest new funds into accelerating the in-service date of the Boxer armoured vehicle and enhancing its capability. Boxer will allow the Army to respond at pace to deliver soldiers around the battlefield, travelling long distances quickly, cross country, and in the most austere and hostile environments. This broader scope including an additional 100 vehicles are now on contract.","benefits":null,"benefitsNarrative":"","themes":["Delivery & schedule","Cost & funding","Commercial & supply chain","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating increased from Amber/Green to Green. This is primarily due to the following factors: The removal of the incremental Amber/Green and Amber/Red assessment ratings. Overall there is strong strategic alignment and high level support, good progress…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"MOD_0115_1718-Q2","year":2023,"name":"Mechanised Infantry Programme","department":"MOD","category":"Military Capability","description":"The Mechanised Infantry Programme will deliver modern wheeled Armoured Personnel Carriers that can perform a range of roles to support the Infantry, Combat Support, and Combat Service Support elements across new Brigade Combat Teams - a new concept emerging from the Integrated Review. The vehicles will be a significant contribution to enabling a highly deployable, networked force to operate differently from conventional industrial age combat forces, offering unique competitive advantage whether fighting, peacekeeping or delivering humanitarian aid.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 decreased from Green to Amber. This is primarily due to the following factors. Global supply chain issues following Covid and the current war in Ukraine impacting at a key point of vehicle manufacture. The programme still forecasts to meet its approved Initial Operating Capability in October 2025 but increased risks require strong management action. The lead contractors have not yet stabilised or fully resolved their ongoing supply chain delays to vehicle production, which is also impacting other areas including training. Further remedial work is also required on Technical Documentation currently being drafted to enable acceptance and safety case work. Similar supply chain issues are also impacting the supply of communications equipment for Boxer also compounded by obsolescence and global supply chain impacts.","startDate":"2017-10-27","endDate":"2033-03-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2033-03-31. This is primarily due to the following factors. NA","fyBaseline":281.43,"fyForecast":86.37,"fyVariance":-69.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors: Delays to equipment delivery and Bowman Government Furnished Equipment with the remainder a combination of reprofiling for risk, training aids, special tools and test equipment, and technical publications.","wholeLifeCost":6741.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 increased from 6575m. to 6741m. This is primarily due to the following factors. Re-profiling from in-year into future years. This was a direct consequence of equipment and Bowman delays and prudent risk-adjustment.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This programme does not report cashable benefits. Its aim is to provision the armed forces with the equipment and / or infrastructure required.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 decreased from Green to Amber. This is primarily due to the following factors. Global supply chain issues following Covid and the current war in Ukraine impacting at a key point of vehicle manufacture. The programme still forecasts…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"MOD_0115_1718-Q2","year":2024,"name":"Mechanised Infantry Programme","department":"MOD","category":"Military Capability","description":"The Mechanised Infantry Programme will deliver modern wheeled Armoured Personnel Carriers that can perform a range of roles to support the Infantry, Combat Support, and Combat Service Support elements across new Brigade Combat Teams - a new concept emerging from the Integrated Review. The vehicles will be a significant contribution to enabling a highly deployable, networked force to operate differently from conventional industrial age combat forces, offering unique competitive advantage whether fighting, peacekeeping or delivering humanitarian aid.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The programme still forecasts to meet its approved Initial Operating Capability in October 2025 but there are increased risks requiring strong management action. The lead contractors of ARTEC (a supplier), Rheinmetall, and Krauss Maffei Wegmann Nexter Defence Systems (KNDS) have not yet stabilised or fully resolved their ongoing supply chain delays to vehicle production, which is also impacting other areas including training. Further remedial work is also required on Technical Documentation currently being drafted to enable acceptance and safety case work. Similar supply chain issues are also impacting the supply of Bowman communications equipment for Boxer also compounded by obsolescence and global supply chain impacts following the war in Ukraine.","startDate":"2017-10-27","endDate":"2033-03-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2033-03-31. This is primarily due to the following factors. The programme has maintained its overall schedule forecast since Q4 2023 against the approved Initial Operating Capability of October 2025, which allowed for risk and contingency in its delivery activities. Industry delays to equipment delivery have consumed contingent float and impacted other programmes aspects, but revised delivery plans are mitigating impacts, including some joint rather than sequential trials between industry and MOD. Early training of driver and operator/maintainer instructors have been undertaken collaborative with Dutch and German allies to de-risk training design, whilst industry are switching supply chains and identifying interim or alternate components to progress trials and manufacture.","fyBaseline":337.18,"fyForecast":144.39,"fyVariance":-57.177,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. This variance was largely due to delays to equipment delivery and Bowman Government Furnished Equipment with the remainder a combination of reprofiling for training aids, specialist tools and test equipment, and technical publications.","wholeLifeCost":6967.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 increased from 6741m. to 6967m. This is primarily due to the following factors. The Programme Whole Life Cost (WLC) Budget (not cost) to Full Operating Capability has increased by 227m since Q4 22/23 as a consequence of re-profiling from prior years into future years. As prior year control totals are not reset as a result of forecast reprofiling, this gives an artificial picture of an increase in cost. This was a direct consequence of equipment and Bowman delays and prudent risk-adjustment.","benefits":0.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 0m.","themes":["Cost & funding","Delivery & schedule","Workforce & capability","Commercial & supply chain"],"evidenceExcerpt":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The programme still forecasts to meet its approved Initial Operating Capability in October 2025 but there are increased risks requiring strong management action. The lead contractors of ARTEC (a supplier),…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"MOD_0115_1718-Q2","year":2025,"name":"MECHANISED INFANTRY PROGRAMME","department":"MoD","category":"Military Capability","description":"The Mechanised Infantry Boxer Programme will deliver modern wheeled Armoured Personnel Carriers and an Armoured Fighting Vehicle modular, common base platform that can perform a range of roles to support the Infantry, Combat Support, and Combat Service Support elements across new Brigade Combat Teams - a new concept emerging from the Integrated Review. The vehicles will be a significant contribution to enabling a highly deployable, networked force to operate differently from conventional industrial age combat forces, offering unique competitive advantage whether fighting, peacekeeping or delivering humanitarian aid.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER, compared with the project's assessment last year of AMBER. This is due to the following factors. The Amber Deliver Confidence Assessment reflects the whole programme delivery forecast to full operating capability (FOC). The Amber rating is still predominantly driven by global supply chain issues following the war in Ukraine and Covid, which are not unique to Defence or Boxer but impacts at a key point of vehicle manufacture. There are increased risks requiring strong management action to drive towards IOC which are not expected to continue through to FOC. Delivery performance is impacted by the lead contractors ARTEC, comprising Rheinmetall and KNDS, who have not yet stabilised or fully resolved their ongoing supply chain delays to vehicle production - which is also impacting other areas including training. Further remedial work is also required on technical documentation currently being drafted to enable training and safety case work. Similar supply chain issues are also impacting the supply of Bowman communications equipment for Boxer also compounded by obsolescence and global supply chain impacts following the war in Ukraine. The DCA is confirmed as Amber by a recent external NISTA Gate 4 programme review.","startDate":"2017-10-27","endDate":"2033-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2033.","fyBaseline":406.66,"fyForecast":297.93,"fyVariance":26.74,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The programme is forecasted to spend £296.446M of £404.82M provisioned to Core Boxer for 24/25 which has resulted in a fade of £108.374M. Vehicle delivery dates were re-profiled to £52M in September 24 following updated delivery dates. Savings have been made in year to reflect the current Capital Departmental Expenditure Limit (CDEL) deferral measures which were implemented at the June 24 forecast. Capital spares were re-profiled in March to 25/26, again based on the updated contractor delivery forecast.","wholeLifeCost":7009.3,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 6967 to 7009. This is primarily due to the following factors. The Programme Whole Life Cost (WLC Budget) (not cost) to Full Operating Capability (FOC) (which includes provision for addition vehicle procurement) has increased by £41.44m since Q4 23/24 as a consequence of re-profiling from prior years into future years and application of the latest inflation estimates offset by re-statement of Foreign Exchange assumptions. This was a direct consequence of vehicle and Bowman delays. As prior year control totals are not reset as a result of forecast reprofiling, this gives an artificial picture of an increase in cost.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Workforce & capability"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER, compared with the project's assessment last year of AMBER. This is due to the following factors. The Amber Deliver Confidence Assessment reflects the whole programme delivery forecast to full operating capability (FOC). The Amber rating is still predominantly…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"MOD_0115_1718-Q2","year":2026,"name":"MECHANISED INFANTRY PROGRAMME","department":"MOD","category":"Military Capability","description":"The Mechanised Infantry Boxer Programme will deliver modern wheeled Armoured Personnel Carriers and an Armoured Fighting Vehicle modular, common base platform that can perform a range of roles across a modernised Army. The vehicles will be a significant contribution to enabling a highly deployable, networked force to operate differently from conventional industrial age combat forces, offering unique competitive advantage whether fighting, peacekeeping or delivering humanitarian aid.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is due to the following factors. 1. This is predominantly driven by global supply chain issues following the war in Ukraine, and Covid, which are not unique to Defence or Boxer but impacts at a key point of vehicle manufacture. 2. The programme’s Initial Operating Capability is delayed with increased risks requiring strong management action, and has been reapproved but not yet published, pending the Defence Investment Plan. 3. The lead contractors of ARTEC, Rheinmetall, and Krauss Maffei Wegmann Nexter Defence Systems (KNDS) have not yet stabilised or fully resolved their ongoing supply chain delays to vehicle production, which is also impacting other areas including support and training.","startDate":"2017-10-27","endDate":"2033-09-09","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 31/3/2033. This is primarily due to the following factors. 1. This year the Initial Operating Capability schedule forecast was delayed as no longer achievable due to supply chain delays impacting delivery and formally reapproved through Review Note 5. 2. This has been further reviewed as the required Collective Training alongside Ajax in Armoured Infantry Brigades is currently impacted by the Ajax pause and alternate training options in the same timeframe were not viable or meaningful. Boxer Collective Training to achieve Initial Operating Capability is being reset and decoupled from Ajax to de-risk this whilst Wavell Structures are matured and joint training will follow; subject to Ajax outcomes.","fyBaseline":529.7,"fyForecast":242.23,"fyVariance":54.27,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. 1. This variance was largely due to delays to vehicle deliveries, Bowman Government Furnished Equipment, Special Tools and Test Equipment and delays in Requests for Quotation for new items and training aids.","wholeLifeCost":5033.66,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) decreased from £7009.30M to £5150.92M. This is primarily due to the following factors. 1. The Programme Whole Life Cost Budget (not cost) to Full Operating Capability has decreased since Q4 24/25 as a consequence of funding removal following Army re-prioritisation of further procurements and Defence Investment Plan Outcomes. 2. There is an ongoing conversation with industry on treatment of contractual VoP (Variation of Price), caused by inflationary supply chain pressures which are also awaiting the Defence Investmetn Plan.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Workforce & capability","Commercial & supply chain","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is due to the following factors. 1. This is predominantly driven by global supply chain issues following the war in Ukraine, and Covid, which are not unique to Defence or Boxer but impacts at a key point of vehicle manufacture.…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"MOD_0115_1718-Q2","year":2025,"name":"MECHANISED INFANTRY PROGRAMME","department":"MoD","category":"Military Capability","description":"The Mechanised Infantry Boxer Programme will deliver modern wheeled Armoured Personnel Carriers and an Armoured Fighting Vehicle modular, common base platform that can perform a range of roles to support the Infantry, Combat Support, and Combat Service Support elements across new Brigade Combat Teams - a new concept emerging from the Integrated Review. The vehicles will be a significant contribution to enabling a highly deployable, networked force to operate differently from conventional industrial age combat forces, offering unique competitive advantage whether fighting, peacekeeping or delivering humanitarian aid.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER, compared with the project's assessment last year of AMBER. This is due to the following factors. The Amber Deliver Confidence Assessment reflects the whole programme delivery forecast to full operating capability (FOC). The Amber rating is still predominantly driven by global supply chain issues following the war in Ukraine and Covid, which are not unique to Defence or Boxer but impacts at a key point of vehicle manufacture. There are increased risks requiring strong management action to drive towards IOC which are not expected to continue through to FOC. Delivery performance is impacted by the lead contractors ARTEC, comprising Rheinmetall and KNDS, who have not yet stabilised or fully resolved their ongoing supply chain delays to vehicle production - which is also impacting other areas including training. Further remedial work is also required on technical documentation currently being drafted to enable training and safety case work. Similar supply chain issues are also impacting the supply of Bowman communications equipment for Boxer also compounded by obsolescence and global supply chain impacts following the war in Ukraine. The DCA is confirmed as Amber by a recent external NISTA Gate 4 programme review.","startDate":"2017-10-27","endDate":"2033-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2033.","fyBaseline":406.66,"fyForecast":297.93,"fyVariance":26.74,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The programme is forecasted to spend £296.446M of £404.82M provisioned to Core Boxer for 24/25 which has resulted in a fade of £108.374M. Vehicle delivery dates were re-profiled to £52M in September 24 following updated delivery dates. Savings have been made in year to reflect the current Capital Departmental Expenditure Limit (CDEL) deferral measures which were implemented at the June 24 forecast. Capital spares were re-profiled in March to 25/26, again based on the updated contractor delivery forecast.","wholeLifeCost":7009.3,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 6967 to 7009. This is primarily due to the following factors. The Programme Whole Life Cost (WLC Budget) (not cost) to Full Operating Capability (FOC) (which includes provision for addition vehicle procurement) has increased by £41.44m since Q4 23/24 as a consequence of re-profiling from prior years into future years and application of the latest inflation estimates offset by re-statement of Foreign Exchange assumptions. This was a direct consequence of vehicle and Bowman delays. As prior year control totals are not reset as a result of forecast reprofiling, this gives an artificial picture of an increase in cost.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Workforce & capability"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER, compared with the project's assessment last year of AMBER. This is due to the following factors. The Amber Deliver Confidence Assessment reflects the whole programme delivery forecast to full operating capability (FOC). The Amber rating is still predominantly…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":162,"attentionScore":42,"attentionReasons":["Current published delivery confidence is Amber","Published end date moved 162 days later","In-year forecast variance is +54.3%"]},{"id":"MOD_0011_2122-Q2","year":2026,"name":"SUBMARINE WATERFRONT INFRASTRUCTURE FUTURE","department":"MOD","category":"Infrastructure and Construction","description":"The Submarine Waterfront Infrastructure Future project is investing £2Bn+ in infrastructure at Devonport to support the maintenance of the Royal Navy’s Astute Class nuclear-powered submarines. The facilities being provided include a new non-tidal maintenance berth, a repurposed dry dock, and associated buildings and services.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Red. This is primarily due to the following factors. 1. Despite positive progress, there are still many challenges in the delivery environment which will prevent completion within the approved time and cost envelope. 2. The main focus across the projects continues to be design completion, recent interventions have been targeted at pace of design decision making and proportionate approvals. 3. Whilst DCA remains Red there are early positive signs of the interventions, and the leadership are focussed on embedding these targeted interventions into normal business. 4. Significant levels of risk/uncertainty in the programme remain with a reset underway.","startDate":"2016-12-31","endDate":"2031-05-21","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remains undetermined. The programme will be reset during FY26.","fyBaseline":467.37,"fyForecast":384.65,"fyVariance":17.7,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. 1. There has been significant in-year fade from Q1 25/26. This is primarily caused by a change in the procurement strategy of the berth, in order to mitigate a number of key construction risks, which has delayed the start of construction activities in year. 2. Future years forecasts have factored this in, combined with the MOD planning cycle submission.","wholeLifeCost":2230.52,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) decreased from £2190.70M to £2066.20M. This is primarily due to the following factors. 1. The programme is managing its Whole Life Costs in conjunction with the MOD's Strategic Planning Cycle. 2. The estimated Whole Life Costs adjustment down is now taking into account a revised financial profile driven by a reduced funding provision in the early years of the Annual Budgetary Cycle. 3. The programme required a substantial reset. This will see increased confidence in the cost estimates and forecasts.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Delivery & schedule","Scope & requirements","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Red. This is primarily due to the following factors. 1. Despite positive progress, there are still many challenges in the delivery environment which will prevent completion within the approved time and cost envelope. 2. The main focus…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"MOD_0011_2122-Q2","year":2022,"name":"Submarine Waterfront Infrastructure Future","department":"MOD","category":"Infrastructure and Construction","description":"The Submarine Waterfront Infrastructure Future project is investing in infrastructure at Devonport to support the maintenance of the Royal Navy's Astute Class nuclear-powered submarines. The facilities being provided include a new non-tidal berth and a refurbished dry dock.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure and Project Authority's Delivery Confidence Assessment rating is Amber. This is primarily due to the following factors: The Submarine Waterfront Infrastructure Future project underwent its first Infrastructure and Projects Authority Review in March 2022 which assessed the project as Amber with \"a clear pathway to Green\". The review observed that, \"the project team, scope, plan, risks, costs, schedule and contract approach are maturing well, with evidence they will continue to do so\".","startDate":"2016-12-31","endDate":"2028-12-15","scheduleNarrative":"The project end-date is 15 December 2028. This is primarily due to the following factors: The Programme entered the Government Major Projects Portfolio in Financial Year 2021/22, as such there is no baseline date recorded for March 21 for comparison.","fyBaseline":110.87,"fyForecast":110.87,"fyVariance":0.0,"varianceNarrative":"The budget variance is inferior or equal to 5%.","wholeLifeCost":448.0,"costNarrative":"The projects Baseline Whole Life Cost is 447.67 (£m). This is primarily due to the following factors: Funding is to the end of the Programme Assessment Phase only.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Commercial & supply chain"],"evidenceExcerpt":"The Infrastructure and Project Authority's Delivery Confidence Assessment rating is Amber. This is primarily due to the following factors: The Submarine Waterfront Infrastructure Future project underwent its first Infrastructure and Projects Authority Review in March 2022 which assessed the project as Amber with \"a clear pathway to Green\". The review…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"MOD_0011_2122-Q2","year":2023,"name":"Submarine Waterfront Infrastructure Future","department":"MOD","category":"Infrastructure and Construction","description":"The Submarine Waterfront Infrastructure Future project is investing in infrastructure at Devonport to support the maintenance of the Royal Navy's Astute Class nuclear-powered submarines. The facilities being provided include a new non-tidal maintenance berth, a refurbished dry dock and supporting buildings and services.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber (SRO rating). This is primarily due to the following factors. As the project transitions into full construction, it remains exposed to a number of risks in the delivery environment outside the project's immediate control.","startDate":"2016-12-31","endDate":"2027-10-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 decreased from 2028-12-15 to 2027-10-31. This is primarily due to the following factors. The previously reported end-date was for completion of the project assessment phase. The end-date reported now is the construction completion dateapproved at Full Business Case.","fyBaseline":182.95,"fyForecast":191.7,"fyVariance":5.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This programme does not report cashable benefits. Its aim is to provision the armed forces with the equipment and / or infrastructure required.","themes":["Delivery & schedule","Cost & funding","Commercial & supply chain","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber (SRO rating). This is primarily due to the following factors. As the project transitions into full construction, it remains exposed to a number of risks in the delivery environment outside the project's immediate control. Compared to financial year…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"MOD_0011_2122-Q2","year":2024,"name":"Submarine Waterfront Infrastructure Future","department":"MOD","category":"Infrastructure and Construction","description":"The Submarine Waterfront Infrastructure Future project is investing £2Bn+ in infrastructure at Devonport to support the maintenance of the Royal Navy’s Astute Class nuclear-powered submarines. The facilities being provided include a new non-tidal maintenance berth, a repurposed dry dock, and associated buildings and services.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remains at Amber. This is primarily due to the following factors. Designs have matured, demolition and site preparation have continued, and all contracts for the main construction works have been placed. Timely completion now depends on achieving the required pace in construction, which remains exposed to significant risks in the delivery environment. 2024 is a critical year for SWIF.","startDate":"2016-12-31","endDate":"2027-10-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the programme's end-date at 23/24-Q4 remained scheduled to finish on 2027-10-31.","fyBaseline":330.0,"fyForecast":330.0,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%","wholeLifeCost":1428.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 23/24-Q4 is 1428m. This is primarily due to the following factors. Final construction contracts awarded and a maturing view on costs informed by design development and engagement with the wider supply chain.","benefits":0.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 0m.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remains at Amber. This is primarily due to the following factors. Designs have matured, demolition and site preparation have continued, and all contracts for the main construction works have been placed. Timely completion now depends on…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"MOD_0011_2122-Q2","year":2025,"name":"SUBMARINE WATERFRONT INFRASTRUCTURE FUTURE","department":"MoD","category":"Infrastructure and Construction","description":"The Submarine Waterfront Infrastructure Future project is investing £2Bn+ in infrastructure at Devonport to support the maintenance of the Royal Navy’s Astute Class nuclear-powered submarines. The facilities being provided include a new non-tidal maintenance berth, a repurposed dry dock, and associated buildings and services.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is RED, compared with the project's assessment last year of AMBER. This is due to the following factors. The main focus through the year has been design. Velocity has not been as forecast owing to a backlog of approving/closing out design packages at the end of each phase. There has been key interventions in simplifying design in year and initiatives are underway to reduce the backlog, both of which will enable the transition to construction. Actions are ongoing to recover the delivery confidence, mature the design and reduce the significant levels of risk/uncertainty in the programme. This will culminate in a reset during financial year 2025.","startDate":"2016-12-31","endDate":null,"scheduleNarrative":"The project's end-date at 24/25-Q4 is exempt. This is primarily due to the following factors. The programme will undergo a reset during financial year 2025. The Baseline to be set following approval of the Supplier Commitment Schedule, which will outline the agreed delivery timelines, quantity of materials and services provided by the supplier.","fyBaseline":536.37,"fyForecast":382.82,"fyVariance":28.63,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The In-Year variance is caused by delays in design completion and therefore a later transition to construction.","wholeLifeCost":null,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 1428 to 2190. This is primarily due to the following factors. The programme is managing its whole life cost (WLC) in conjunction with the MOD's Annual Budgetary Cycle. Confidence in the WLC will be a critical outcome of the programme reset.","benefits":null,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Scope & requirements","Delivery & schedule","Commercial & supply chain"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is RED, compared with the project's assessment last year of AMBER. This is due to the following factors. The main focus through the year has been design. Velocity has not been as forecast owing to a backlog of approving/closing out design packages at the end of each…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"MOD_0011_2122-Q2","year":2026,"name":"SUBMARINE WATERFRONT INFRASTRUCTURE FUTURE","department":"MOD","category":"Infrastructure and Construction","description":"The Submarine Waterfront Infrastructure Future project is investing £2Bn+ in infrastructure at Devonport to support the maintenance of the Royal Navy’s Astute Class nuclear-powered submarines. The facilities being provided include a new non-tidal maintenance berth, a repurposed dry dock, and associated buildings and services.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Red. This is primarily due to the following factors. 1. Despite positive progress, there are still many challenges in the delivery environment which will prevent completion within the approved time and cost envelope. 2. The main focus across the projects continues to be design completion, recent interventions have been targeted at pace of design decision making and proportionate approvals. 3. Whilst DCA remains Red there are early positive signs of the interventions, and the leadership are focussed on embedding these targeted interventions into normal business. 4. Significant levels of risk/uncertainty in the programme remain with a reset underway.","startDate":"2016-12-31","endDate":"2031-05-21","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remains undetermined. The programme will be reset during FY26.","fyBaseline":467.37,"fyForecast":384.65,"fyVariance":17.7,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. 1. There has been significant in-year fade from Q1 25/26. This is primarily caused by a change in the procurement strategy of the berth, in order to mitigate a number of key construction risks, which has delayed the start of construction activities in year. 2. Future years forecasts have factored this in, combined with the MOD planning cycle submission.","wholeLifeCost":2230.52,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) decreased from £2190.70M to £2066.20M. This is primarily due to the following factors. 1. The programme is managing its Whole Life Costs in conjunction with the MOD's Strategic Planning Cycle. 2. The estimated Whole Life Costs adjustment down is now taking into account a revised financial profile driven by a reduced funding provision in the early years of the Annual Budgetary Cycle. 3. The programme required a substantial reset. This will see increased confidence in the cost estimates and forecasts.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Delivery & schedule","Scope & requirements","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Red. This is primarily due to the following factors. 1. Despite positive progress, there are still many challenges in the delivery environment which will prevent completion within the approved time and cost envelope. 2. The main focus…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"MOD_0011_2122-Q2","year":2025,"name":"SUBMARINE WATERFRONT INFRASTRUCTURE FUTURE","department":"MoD","category":"Infrastructure and Construction","description":"The Submarine Waterfront Infrastructure Future project is investing £2Bn+ in infrastructure at Devonport to support the maintenance of the Royal Navy’s Astute Class nuclear-powered submarines. The facilities being provided include a new non-tidal maintenance berth, a repurposed dry dock, and associated buildings and services.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is RED, compared with the project's assessment last year of AMBER. This is due to the following factors. The main focus through the year has been design. Velocity has not been as forecast owing to a backlog of approving/closing out design packages at the end of each phase. There has been key interventions in simplifying design in year and initiatives are underway to reduce the backlog, both of which will enable the transition to construction. Actions are ongoing to recover the delivery confidence, mature the design and reduce the significant levels of risk/uncertainty in the programme. This will culminate in a reset during financial year 2025.","startDate":"2016-12-31","endDate":null,"scheduleNarrative":"The project's end-date at 24/25-Q4 is exempt. This is primarily due to the following factors. The programme will undergo a reset during financial year 2025. The Baseline to be set following approval of the Supplier Commitment Schedule, which will outline the agreed delivery timelines, quantity of materials and services provided by the supplier.","fyBaseline":536.37,"fyForecast":382.82,"fyVariance":28.63,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The In-Year variance is caused by delays in design completion and therefore a later transition to construction.","wholeLifeCost":null,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 1428 to 2190. This is primarily due to the following factors. The programme is managing its whole life cost (WLC) in conjunction with the MOD's Annual Budgetary Cycle. Confidence in the WLC will be a critical outcome of the programme reset.","benefits":null,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Scope & requirements","Delivery & schedule","Commercial & supply chain"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is RED, compared with the project's assessment last year of AMBER. This is due to the following factors. The main focus through the year has been design. Velocity has not been as forecast owing to a backlog of approving/closing out design packages at the end of each…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":null,"attentionScore":41,"attentionReasons":["Current published delivery confidence is Red","In-year forecast variance is +17.7%"]},{"id":"DESNZ_0542_2526-Q2","year":2026,"name":"Warm Homes Agency","department":"DESNZ","category":"Government Transformation and Service Delivery","description":"Project is to establish the Warm Homes Agency (WHA) – a dedicated public body to support the delivery of the Warm Homes Plan, and guide consumers through the transition.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"The SRO Delivery Confidence Assessment (DCA) rating at 2025/26 Q4 is Red. The project is operating within a changed organisational context and is undertaking replanning work to ensure that delivery plans remain realistic and achievable within available resources, while prioritising key activities such as the necessary Primary Legislation.","startDate":"2024-07-08","endDate":"2027-12-31","scheduleNarrative":"The project joined the GMPP in 25/26. The expected project end date is currently 31/12/2027 but this is subject to replanning which is taking place over May to August 2026.","fyBaseline":7.8,"fyForecast":6.49,"fyVariance":16.77,"varianceNarrative":"The financial year forecast comes 16.77% under the baseline figure for 2025/26. This variance is primarily driven by two factors. First, updated estimates for resource support required to transition existing delivery bodies into the new agency are lower than initially forecast, following refinement of assumptions and commercial engagement. Second, expenditure on digital and IT activities in 2025/26 is lower than planned due to the discovery phase progressing over a longer period than initially anticipated. As a result, costs associated with system transition and implementation are now expected to be incurred in 2026/27.","wholeLifeCost":276.69,"costNarrative":"The Whole Life Costs figure (converted to real prices with base year 24/25) consists of resource costs for 25/26 to 28/29 and capital costs for 25/26 to 29/30, which are subject to funding. The resource costs are the costs to be incurred in establishing the agency, which includes set-up, implementation and transition costs. The capital portion of the whole life cost is made up of the capital required to transition existing IT systems over to the new agency, as well as creating new IT systems.","benefits":null,"benefitsNarrative":"The Warm Homes Agency is a key enabler of our Warm Homes Plan, designed to drive consumer demand for warmer, greener homes whilst galvanising the supply chain and coordinating delivery across the UK. By bringing together some schemes as well as advisory and assurance services currently split across DESNZ, Ofgem, and Salix, we are creating a clearer, more efficient system for households and taxpayers alike. As the scope is still being refined (subject to ministerial approval) full benefit quantification is not possible at this stage.","themes":["Cost & funding","Delivery & schedule","Workforce & capability","Commercial & supply chain"],"evidenceExcerpt":"The SRO Delivery Confidence Assessment (DCA) rating at 2025/26 Q4 is Red. The project is operating within a changed organisational context and is undertaking replanning work to ensure that delivery plans remain realistic and achievable within available resources, while prioritising key activities such as the necessary Primary Legislation. The project joined…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"DESNZ_0542_2526-Q2","year":2026,"name":"Warm Homes Agency","department":"DESNZ","category":"Government Transformation and Service Delivery","description":"Project is to establish the Warm Homes Agency (WHA) – a dedicated public body to support the delivery of the Warm Homes Plan, and guide consumers through the transition.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"The SRO Delivery Confidence Assessment (DCA) rating at 2025/26 Q4 is Red. The project is operating within a changed organisational context and is undertaking replanning work to ensure that delivery plans remain realistic and achievable within available resources, while prioritising key activities such as the necessary Primary Legislation.","startDate":"2024-07-08","endDate":"2027-12-31","scheduleNarrative":"The project joined the GMPP in 25/26. The expected project end date is currently 31/12/2027 but this is subject to replanning which is taking place over May to August 2026.","fyBaseline":7.8,"fyForecast":6.49,"fyVariance":16.77,"varianceNarrative":"The financial year forecast comes 16.77% under the baseline figure for 2025/26. This variance is primarily driven by two factors. First, updated estimates for resource support required to transition existing delivery bodies into the new agency are lower than initially forecast, following refinement of assumptions and commercial engagement. Second, expenditure on digital and IT activities in 2025/26 is lower than planned due to the discovery phase progressing over a longer period than initially anticipated. As a result, costs associated with system transition and implementation are now expected to be incurred in 2026/27.","wholeLifeCost":276.69,"costNarrative":"The Whole Life Costs figure (converted to real prices with base year 24/25) consists of resource costs for 25/26 to 28/29 and capital costs for 25/26 to 29/30, which are subject to funding. The resource costs are the costs to be incurred in establishing the agency, which includes set-up, implementation and transition costs. The capital portion of the whole life cost is made up of the capital required to transition existing IT systems over to the new agency, as well as creating new IT systems.","benefits":null,"benefitsNarrative":"The Warm Homes Agency is a key enabler of our Warm Homes Plan, designed to drive consumer demand for warmer, greener homes whilst galvanising the supply chain and coordinating delivery across the UK. By bringing together some schemes as well as advisory and assurance services currently split across DESNZ, Ofgem, and Salix, we are creating a clearer, more efficient system for households and taxpayers alike. As the scope is still being refined (subject to ministerial approval) full benefit quantification is not possible at this stage.","themes":["Cost & funding","Delivery & schedule","Workforce & capability","Commercial & supply chain"],"evidenceExcerpt":"The SRO Delivery Confidence Assessment (DCA) rating at 2025/26 Q4 is Red. The project is operating within a changed organisational context and is undertaking replanning work to ensure that delivery plans remain realistic and achievable within available resources, while prioritising key activities such as the necessary Primary Legislation. The project joined…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":null,"ratingDelta":null,"transition":"Not comparable","endDateDeltaDays":null,"attentionScore":41,"attentionReasons":["Current published delivery confidence is Red","In-year forecast variance is +16.8%"]},{"id":"BIS_0015_1516-Q1","year":2026,"name":"LOCAL LAND CHARGES (LLC) PROGRAMME","department":"HMLR","category":"Government Transformation and Service Delivery","description":"The Local Land Charges (LLC) Programme is transforming a fragmented, inefficient service currently delivered by local authorities (LAs) to a single national, digital register across England and Wales. LLCs are generally restrictions or prohibitions on the use of land, such as planning consents or tree preservation order, which binds successive owners and occupiers. This information is obtained as part of LA searches completed in the property buying process and is integral to the purchasers’ investment decision.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the need for proven end to end delivery at scale by external suppliers, which will be proven in 2026, and external dependencies the programme manage on a case by case basis.","startDate":"2014-03-01","endDate":"2028-12-29","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 increased from 31/03/2027 to 29/12/2028. This is primarily due to a better understanding of delivery length assumptions, and completion of detailed programme delivery planning. This remains in line with the refreshed LLC Full Business Case.","fyBaseline":35.9,"fyForecast":33.6,"fyVariance":6.41,"varianceNarrative":"Programme in year underspend is related to delivery. Current delivery schedules are extended, resulting in increased spend in latter programme years.","wholeLifeCost":346.22,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 remained the same. Following HMT FBC approval, revised baselines will be forecasted.","benefits":8221.01,"benefitsNarrative":"No changes to agreed benefit baselines until programme Monitoring & Evaluation Phase 3 completes in 2027. Current benefit realisation on track.","themes":["Delivery & schedule","Cost & funding","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the need for proven end to end delivery at scale by external suppliers, which will be proven in 2026, and external dependencies the programme manage on a case by case basis. Compared to financial year 24/25-Q4, the…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"BIS_0015_1516-Q1","year":2020,"name":"Local Land Charges (LLC) Programme","department":"BEIS","category":"ICT","description":"The Programme will deliver a single Local Land Charges (LLC) Service for England.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber, which has not changed since last year�s Q2 1819 Amber, due primarily to the following factors; - The Programme has reached a pivotal point in its delivery as it moves towards the end of Phase 1. There are important tools in production including the register and migration readiness tools and a commercial agreement with a digitisation supplier. All augers well for delivery of the overall programme. - However, the Programme is still in the learning phase and it needs to guard against the desire to prioritise delivery of Local Authority (LA) migrations over future design and learning. - A change of focus on the outcomes from Phase 1, a concentration on the development of useful metrics and the time and space to examine alternate options will give greater confidence that the Programme will deliver its overall objectives and maximise the benefits to UK PLC. Since the Q2 1920 (30th September 2019) Amber IPA DCA, the following non-project operating environment activities have impacted the original Q2 IPA DCA; - The uncertainty around EU Exit timings and restricted activities in a pre-election period impacted local authority and potential supplier engagement activities and progress. Since the Q2 1920 (30th September 2019) Amber IPA DCA, the following primary project actions have impacted the original Q2 IPA DCA; - As a result of learning to date, the Programme adapted its approach to focus on pre-migration activity, including early data analysis and engagement with LAs. This enabled a richer understanding of the migration challenges and timelines. - The Programme has developed and consulted on a new delivery model which forms the basis of the new business case. This better aligns with the desired outcomes for the Programme, to unlock the economic benefits quicker. - The benefits model has been substantially revised to identify and quantify the wider economic benefits of the investment.","startDate":"2014-03-01","endDate":"2023-11-17","scheduleNarrative":"The scheduled baseline project end date at Q2 1920 (30th September 2019) is 17/11/23, has not changed since last year's Q2 1819 date of 17/11/23, due primarily to the following factors; - The current business case proposes extending Phase 1 for another year to put in place and test the delivery model. This will enable a more informed business case and delivery timeline to be developed. - The Programme is dependent on local authorities signing up for data analysis and migration. The refreshed pre-migration and early engagement strategies are designed to bring more LAs forward quicker. - Given the significant time to migrate an individual LA and the number of LAs, this Programme is likely to be a multi-year programme. Since the Q2 1920 (30th September 2019) baseline project end date of 17/11/23, the following non-project operating environment activities have impacted the original Q2 baseline project end date; - There is a reliance on local authorities (and/or their software suppliers) to be engaged and able to extract data from their current system, to feed into the early data analysis work. - This programme has a significant dependency on the LAs existing software suppliers to extract the data and transfer it to HMLR systems for analysis. As approval for the Programme is currently on an annual basis, suppliers are reluctant to investment in their systems to create more strategic and streamlined solutions. Since the Q2 1920 (30th September 2019) baseline project end date of 17/11/23, the following primary project actions have impacted the original Q2 baseline project end date; - Machine learning analytic tools, such as the Migration Helper, is already proving to reduce migration timelines, particularly for improving spatial data. - New delivery models have been designed to enable several local authorities to migrate concurrently and with more appropriate support. The engagement strategy, commercial strategy and internal team capabilities have been redesigned to align with this and speed up delivery.","fyBaseline":32.5,"fyForecast":7.0,"fyVariance":-78.0,"varianceNarrative":"The 19/20 in-year baseline / forecast variance at Q2 1920 (30th September 2019) of -78%, is due primarily to the following factors; - The baseline is based on the OBC approved in September 2015. The Programme has since submitted a full PBC, but due to general election delays, were advised in November 2017 to identify lower cost and more targeted solutions of migrating LAs. Since, funding has been on a phased basis. - The original approved Phase 1 spend was �15m to cover the 15 months to March 19 and at the end of this period HMLR was approved to extend the Phase 1 period to 19/20 to complete up to 16 Local Authorities. - Actual spend has been significantly below the OBC assumption which assumed the Programme would be in full flight with a significant number of suppliers on board and migrating c70 Local Authorities in 19/20. Since the Q2 1920 (30th September 2019) 19/20 in-year baseline / forecast variance of -78%, the following non-project operating environment activities have impacted the original Q2 19/20 in-year baseline / forecast variance; - Despite good progress being made in 19/20, LA migration was much slower than expected and the cumulative number of live migrated LAs at the end of March 20 was 9 compared to the forecast at Q2 of 15. Consequently, this has led to some lower costs e.g. LA burdens payments. - Actual spend with suppliers in 19/20 has also been lower than forecast at Q2 due to issues with LA data quality, the need for some work to be completed in house and also delays in signing contracts with some incumbent suppliers. Since the Q2 1920 (30th September 2019) 19/20 in-year baseline / forecast variance of -78%, the following primary project actions have impacted the original Q2 19/20 in-year variance; - Whilst unlikely to have a material impact in 19/20, the Programme has been working to design a new operating model, capable of increasing the pace of delivery while lowering costs i.e. industrialisation of the migration process. - The Programme has reflected on the learning from Phase 1 to date and has increased the amount of skilled and experience resource on the Programme specifically in the areas of pre-market engagement, plus additional Contract and Supplier Manager roles.","wholeLifeCost":193.3,"costNarrative":"The baseline Whole Life Cost at Q2 1920 (30th September 2019) is �193.30 m, has not changed since last year's Q2 1819 (�m) baseline Whole Life Cost of �193.30 m, due primarily to the following factors; - As mentioned in section 3, the baseline represents the last approved business case being the OBC from September 2015. Since then the Programme has submitted a full PBC, but this was not approved and therefore the Programme full life baseline has not been able to be refreshed. - The Programme funding approvals have been on a phased basis demonstrating lessons learnt over a smaller number of LAs. Since the Q2 1920 (30th September 2019) �193.30 m baseline Whole Life Cost, the following non-project operating environment activities have impacted the original baseline Q2 Whole Life Cost; - The baselines at Q2 were unchanged for the reasons outlined above. - The full assessment of the impact of Covid-19 on the delivery of the Programme and associated costs has yet to be undertaken. Since the Q2 1920 (30th September 2019) �193.30 m baseline Whole Life Cost, the following primary project actions have impacted the original Q2 baseline Whole Life Cost; - The Programme is looking to refine the time, costs and income estimates including delivery costs and potential sales volumes, based on a deeper understanding of the data in LAs and the steps required to improve it. - The work the Programme is undertaking now and into the next financial year will give greater clarity on the risks and opportunities to the costs, benefits and delivery approach in order to refresh the full PBC during late 2020.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Technical & integration","Delivery & schedule","Commercial & supply chain"],"evidenceExcerpt":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber, which has not changed since last year�s Q2 1819 Amber, due primarily to the following factors; - The Programme has reached a pivotal point in its delivery as it moves towards the end of Phase 1. There are important tools in production including the register and…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2020","sourceLabel":"IPA Annual Report 2019-20"},{"id":"BIS_0015_1516-Q1","year":2021,"name":"Local Land Charges (LLC) Programme","department":"HMLR","category":"Government Transformation and Service Delivery","description":"Deliver a single Local Land Charges (LLC) Service for England and Wales, to provide a national resilient service with consistency of customer experience and fees.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating decreased from Amber to Amber/Green. This is primarily due to the following factors: The Programme delivered all of it's Business Case objectives for FY20/21. The operating model to scale up delivery is in place. This includes scaling up capability and capacity of the internal delivery team, aswell as concluding procurement to appoint new data and digitisation suppliers. The Engagement Strategy is proving successful with local authorities signing up for migration to the new service, enabling us to deliver the ambitious 4 year data migration timeframe. The Welsh Government has approved legislation to be part of the new service. The Programme doubled the number of local authorities migrated to the register, putting Covid contingency measures in place and adapting to new ways of working with stakeholders.","startDate":"2014-03-01","endDate":"2027-03-31","scheduleNarrative":"Compared to financial year 19/20-Q2, the project's end-date increased from 17 November 2023 to 31 March 2027 . This is primarily due to the following factors: The Programme has met all of it's objectives as defined in the current Business Case and has now agreed am ambitious but 4 year delivery plan with HM Treasury, which will bring the Programme end back back to 2025.","fyBaseline":32.5,"fyForecast":7.39,"fyVariance":-77.0,"varianceNarrative":"The budget variance exceeds 5%. The forecast spend has been less than predicted due to the ongoing impact of the Covid19 pandemic. Spend with external suppliers has also been lower due to extended procurement timelines whilst requirements were defined, resulting in data migration work being completed in-house to date.","wholeLifeCost":193.3,"costNarrative":"Compared to financial year 19/20-Q2, the projects Baseline Whole Life Cost remained at �193.30m. This is primarily due to the following factors: Whole life costs will be updated in line with our new Programme Business Case, currently going through the approvals process.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Technical & integration","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating decreased from Amber to Amber/Green. This is primarily due to the following factors: The Programme delivered all of it's Business Case objectives for FY20/21. The operating model to scale up delivery is in place. This includes scaling up…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21"},{"id":"BIS_0015_1516-Q1","year":2022,"name":"Local Land Charges (LLC) Programme","department":"HMLR","category":"Government Transformation and Service Delivery","description":"The Programme has met all of it's FY21/22 (Year 1) HM Treasury commitments as defined in the current Business Case. The 4 Year Delivery Plan has been refined to ensure delivery can be achieved within the ambitious timescales, which sees the Programme end in 2025.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"NA The Programme has delivered all of it's HM Treasury commitments for FY21/22 (Year 1) . The operating model is now embedded and has been independently assured. The HMLR internal delivery team is now working at full capacity and has been responsible for all delivery within this financial year, tripling the number of local authority (LA) migrations completed this year. Two digitisation suppliers have been procured and are now working collaboratively with internal delivery teams on their first LA migrations. Our Engagement Strategy continues to be successful, with 89% of all English LAs and all Welsh LAs signed up for data migration to the new service. Customer feedback on the live service remains incredibly popular.","startDate":"2014-03-01","endDate":"2027-03-31","scheduleNarrative":"Compared to 2021-Q4, your project end-date remained scheduled to finish on 31 MAR 2027 . This is primarily due to the following factors: The Programme now has an approved 4 Year Delivery Plan, seeing the end date brought back to 2025.","fyBaseline":42.55,"fyForecast":23.38,"fyVariance":-45.0,"varianceNarrative":"The budget variance exceeds 5%. This year's forecast spend has been lower than predicted due to delayed spend with external digitisation suppliers, whilst requirements were defined.","wholeLifeCost":331.0,"costNarrative":"Compared to2021-Q4, the projects Baseline Whole Life Cost increased from 193.30 (£m) to 331.19 (£m). This is primarily due to the following factors: Whole life costs for our refined Delivery Plan, remain within the overall cost envelope in the approved Business Case.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Technical & integration","Approvals & decisions"],"evidenceExcerpt":"NA The Programme has delivered all of it's HM Treasury commitments for FY21/22 (Year 1) . The operating model is now embedded and has been independently assured. The HMLR internal delivery team is now working at full capacity and has been responsible for all delivery within this financial year, tripling the number of local authority (LA) migrations…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"BIS_0015_1516-Q1","year":2023,"name":"Local Land Charges (LLC) Programme","department":"HMLR","category":"Government Transformation and Service Delivery","description":"Deliver a digital national Local Land Charges Register and service that covers all of England and Wales, thereby improving home buying through the digital service, with spatial data at its core. In-house delivered migrations are doing well and operating to plan, with the overall pace of delivery doubling year on year. The delivery plan has been refined, taking into account the successful onboarding of two Migration Service Delivery Partners.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 21/22-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. The programme is doing well with in-house delivered migrations operating to plan and the overall pace of delivery has effectively doubled year on year; however, the length of time taken by the suppliers to get up to speed has meant their contribution to overall volume is less than set out in the original FBC. An updated business case, which takes into account supplier performance, will go to ministers imminently this sets out how the programme will complete in line with the cost and benefits estimates of the original business case, but delivery will take an additional year.Recent recruitment campaigns in the Digitisation and Business Analysts Teams has brought stability in these areas, ensuring the Programme has the capacity and capability to meet delivery volumes.Additionally, the Programme won the 'Championing Continuous Improvement' award by Smarter Working Live for collaborative efforts to improve processes and speed of migration delivery.","startDate":"2014-03-01","endDate":"2027-03-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2027-03-31. This is primarily due to the following factors. The refreshed Business Case seeks approval to extend the delivery plan into a fifth year, FY25/26, following delays in the Migration Service Delivery Partners. There is no impact on the overall cost envelop, just movement of spend into FY25/26.","fyBaseline":50.25,"fyForecast":26.95,"fyVariance":-46.0,"varianceNarrative":"The budget variance exceeds 5%. This year's forecast spend has been lower than predicted due to delayed spend with external digitisation suppliers, including delays in contract award, onboarding and exiting the implementation stage. Consequently, there has been an underspend due to the movement in forecast for Transition Payments and New Burdens payments to LAs.","wholeLifeCost":331.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 remained at 331m. This is primarily due to the following factors. Whole life costs for our refined delivery plan remain within the overall cost envelope in the approved Business Case","benefits":9616.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 9616m. The project's departmental-agree monetised benefits at 22/23-Q4 is 9616m.The project's departmental-agree monetised benefits at 22/23-Q4 is 9616m.The project's departmental-agree monetised benefits at 22/23-Q4 is 9616m. Compared to financial year 21/22-Q4, benefits at FY22/23-Q4 remain the same. This is primarily due to the Programme continuing to deliver to schedule although this will be reviewed as the Business Case is refreshed this quarter.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. The programme is doing well with in-house delivered migrations operating to plan and the overall pace of delivery has effectively doubled year on year; however, the length of…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"BIS_0015_1516-Q1","year":2024,"name":"Local Land Charges (LLC) Programme","department":"HMLR","category":"Government Transformation and Service Delivery","description":"The LLC Programme continues to deliver a digital national Local Land Charges Register, with spatial data at it's core. The service covers all of England and Wales, contributing to improving the home buying and selling process, with almost 100 Local Authorities live. _x000D_ _x000D_ The programme has completed a third of the data digitisation and transformation work and is on track to deliver in line with future expectations, which have been refined based on experiences to date.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The programme has completed a third of the data digitisation and transformation work and is on track to deliver in line with future expectations. _x000D_ _x000D_ External supplier related dependencies - both LA software suppliers and Migration Service Delivery Partners - has meant that migration volumes have been lower than planned up to this point. A refreshed Business Case has been drafted ready for submitting to HMT that takes into account a revised, more realistic delivery plan with regards to key incumbent suppliers' historical performance, the complex LA strategy and assumptions on Migration Service Delivery Partners performance, contract renewal and no offshoring decision._x000D_ _x000D_ Recent conversion of agency staff to fixed term appointments has created stability for staff and delivery, with further recruitment planned to bring the programme up to full headcount by Summer 24._x000D_ _x000D_ The Programme has won three awards, including Civil Service \"Programme of the Year\" award.","startDate":"2014-03-01","endDate":"2027-03-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2027-03-31. This is primarily due to the following factors. The refreshed Business Case seeks to extend the delivery plan into FY 27/28, which takes into account overall programme experience to date. There is a marginal impact on the overall cost envelope in the best case scenario of 14m.","fyBaseline":56.15,"fyForecast":25.94,"fyVariance":-54.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. This year's forecast spend has been lower than predicted due to delayed spend with external digitisation suppliers, due to it taking them longer to get to grips with the work. Consequently, there has been an underspend due to the movement in forecast for Transition Payments and New Burdens payments to LAs.","wholeLifeCost":331.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 remained at 331m. This is primarily due to the following factors. Whole life costs for our refined delivery plan are in line with the refreshed business case.","benefits":9616.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 9616m. Compared to financial year 22/23Q4, benefits at FY23/24-Q4 remain the same. This is primarily due to the Programme continuing to deliver to schedule although this has been reviewed and updated as part of the refreshed Business Case.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Technical & integration"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The programme has completed a third of the data digitisation and transformation work and is on track to deliver in line with future expectations. _x000D_ _x000D_ External…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"BIS_0015_1516-Q1","year":2025,"name":"LOCAL LAND CHARGES (LLC) PROGRAMME","department":"HMLR","category":"Government Transformation and Service Delivery","description":"The Local Land Charges (LLC) Programme is transforming a fragmented, inefficient service currently delivered by local authorities (LAs) to a single national, digital register across England and Wales. LLCs are generally restrictions or prohibitions on the use of land, which binds successive owners and occupiers. A modernised LLC service will contribute to the industrial strategy and improve the end to end house buying and selling process.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Critical external dependencies. Delivery from Migration Service Delivery Partners (MSDPs) needs to ramp up in line with revised Business Case schedule. Internal review scheduled for Q2 to review Landmark (a MSDP) capability.","startDate":"2014-03-01","endDate":"2027-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2027. This is primarily due to the following factors‚ No changes to current project timelines until Spending Review outcomes are finalised (expected Q2 FY25/26)","fyBaseline":57.95,"fyForecast":29.46,"fyVariance":49.16,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ Programme underspend is related to delivery. Current delivery schedules are extended, resulting in increased spend in latter programme years.","wholeLifeCost":331.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 331. This is primarily due to the following factors‚ No changes to departmental agreed costs until Spending Review outcomes are finalised (expected Q2 FY25/26)","benefits":9616.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 9616. This is primarily due to the following factors‚ No changes to departmental agreed benefits baselines until Spending Review outcomes are finalised (expected Q2 FY25/26)","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Critical external dependencies. Delivery from Migration Service Delivery Partners (MSDPs) needs to ramp up in line with revised Business Case schedule. Internal…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"BIS_0015_1516-Q1","year":2026,"name":"LOCAL LAND CHARGES (LLC) PROGRAMME","department":"HMLR","category":"Government Transformation and Service Delivery","description":"The Local Land Charges (LLC) Programme is transforming a fragmented, inefficient service currently delivered by local authorities (LAs) to a single national, digital register across England and Wales. LLCs are generally restrictions or prohibitions on the use of land, such as planning consents or tree preservation order, which binds successive owners and occupiers. This information is obtained as part of LA searches completed in the property buying process and is integral to the purchasers’ investment decision.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the need for proven end to end delivery at scale by external suppliers, which will be proven in 2026, and external dependencies the programme manage on a case by case basis.","startDate":"2014-03-01","endDate":"2028-12-29","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 increased from 31/03/2027 to 29/12/2028. This is primarily due to a better understanding of delivery length assumptions, and completion of detailed programme delivery planning. This remains in line with the refreshed LLC Full Business Case.","fyBaseline":35.9,"fyForecast":33.6,"fyVariance":6.41,"varianceNarrative":"Programme in year underspend is related to delivery. Current delivery schedules are extended, resulting in increased spend in latter programme years.","wholeLifeCost":346.22,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 remained the same. Following HMT FBC approval, revised baselines will be forecasted.","benefits":8221.01,"benefitsNarrative":"No changes to agreed benefit baselines until programme Monitoring & Evaluation Phase 3 completes in 2027. Current benefit realisation on track.","themes":["Delivery & schedule","Cost & funding","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the need for proven end to end delivery at scale by external suppliers, which will be proven in 2026, and external dependencies the programme manage on a case by case basis. Compared to financial year 24/25-Q4, the…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"BIS_0015_1516-Q1","year":2025,"name":"LOCAL LAND CHARGES (LLC) PROGRAMME","department":"HMLR","category":"Government Transformation and Service Delivery","description":"The Local Land Charges (LLC) Programme is transforming a fragmented, inefficient service currently delivered by local authorities (LAs) to a single national, digital register across England and Wales. LLCs are generally restrictions or prohibitions on the use of land, which binds successive owners and occupiers. A modernised LLC service will contribute to the industrial strategy and improve the end to end house buying and selling process.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Critical external dependencies. Delivery from Migration Service Delivery Partners (MSDPs) needs to ramp up in line with revised Business Case schedule. Internal review scheduled for Q2 to review Landmark (a MSDP) capability.","startDate":"2014-03-01","endDate":"2027-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2027. This is primarily due to the following factors‚ No changes to current project timelines until Spending Review outcomes are finalised (expected Q2 FY25/26)","fyBaseline":57.95,"fyForecast":29.46,"fyVariance":49.16,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ Programme underspend is related to delivery. Current delivery schedules are extended, resulting in increased spend in latter programme years.","wholeLifeCost":331.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 331. This is primarily due to the following factors‚ No changes to departmental agreed costs until Spending Review outcomes are finalised (expected Q2 FY25/26)","benefits":9616.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 9616. This is primarily due to the following factors‚ No changes to departmental agreed benefits baselines until Spending Review outcomes are finalised (expected Q2 FY25/26)","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Critical external dependencies. Delivery from Migration Service Delivery Partners (MSDPs) needs to ramp up in line with revised Business Case schedule. Internal…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":639,"attentionScore":40,"attentionReasons":["Current published delivery confidence is Amber","Published end date moved 639 days later","In-year forecast variance is +6.4%"]},{"id":"HO_0332_2324-Q4","year":2026,"name":"NATIONAL STRATEGIC AUTOMATIC NUMBER PLATE RECOGNITION PLATFORM (NSAP)","department":"HO","category":"Government Transformation and Service Delivery","description":"The National ANPR (Automatic Number Plate Recognition) Capability provides lines of enquiry and evidence in the investigation of crime and is used by forces throughout England, Wales and Scotland as well as approved Law Enforcement Agencies. The National Strategic ANPR Platform (NSAP) Programme is delivering the next generation of data store, integration and application capabilities to support Police and Law Enforcement in their public protection missions.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Exempt under Section 31 (1) - Law enforcement","startDate":"2023-03-01","endDate":"2030-03-30","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remains the same date (29/03/30)","fyBaseline":39.03,"fyForecast":36.73,"fyVariance":5.91,"varianceNarrative":"The budget variance only just exceeds 5%. This is primarily due to unforeseen pressures influencing in year forecasting.","wholeLifeCost":391.77,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 decreased from last year's WLC. This is primarily due to the reduction of the Optimism Bias.","benefits":35.68,"benefitsNarrative":"Exempt under Section 31 (1) - Law enforcement","themes":["Cost & funding"],"evidenceExcerpt":"Exempt under Section 31 (1) - Law enforcement Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remains the same date (29/03/30)","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"HO_0332_2324-Q4","year":2024,"name":"National Strategic Automatic Number Plate Recognition Platform (NSAP)","department":"HO","category":"Government Transformation and Service Delivery","description":"The National Automatic Number Plate Recognition Service (NAS) is a police critical national system enabling policing and Law Enforcement Agencies to have the right information on time for intelligence on vehicle activity across the country and to effectively use it to protect the public, prevent crime in some instances and use the evidence for convictions in court. This intelligence also supports National Counter Terrorism, County Lines, and Serious and Organised Crime investigations. _x000D_ NAS are in the early stages of setting up a new programme to deliver a new solution to replace the legacy system and enabling continuation of the NAS service.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. The programme is currently engaging with stakeholders to develop the scope of the future road map. Discussions are due to begin with the existing supplier to develop the exit and decommissioning strategy for the legacy technology. Programme plan for future delivery phases will be developed in line with the future road map and the programme team structure will be revisited to ensure sufficient expertise and resilience. Work is underway to review the existing governance framework to ensure it is clearly understood by key stakeholders.","startDate":"2023-03-01","endDate":"2028-03-30","scheduleNarrative":"The project's end-date at 23/24-Q4 is 2028-03-30. This is primarily due to the following factors. The programme is currently on schedule to complete by March 2028. The Phase one delivery had moved 8 weeks however this has not impacted on phase two which is due to deliver in October 2024. Commercial activity is underway to deliver the commercial retender exercise by March 2025 to identify the future service provider.","fyBaseline":28.57,"fyForecast":25.81,"fyVariance":-10.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. Budget/ Forecast variance is currently less than 2%","wholeLifeCost":284.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 23/24-Q4 is 284m. This is primarily due to the following factors. The whole Life costs include the transition from legacy technology to cloud with an evergreening support model, reducing technical debt and enabling future enhancements through exploiting technical advances. The costs include the potential dual running costs to facilitate transition.","benefits":0.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 0m. There are currently no identified financial benefits as this system is replacing Police critical national infrastructure in order to maintain existing capability. There are however non monetised benefits that are being discussed and mapped and require a stakeholder sign up to monitoring these benefits before we can start reporting them further details are with the programme.","themes":["Cost & funding","Delivery & schedule","Technical & integration","Commercial & supply chain"],"evidenceExcerpt":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. The programme is currently engaging with stakeholders to develop the scope of the future road map. Discussions are due to begin with the existing supplier to develop the exit and decommissioning strategy for the legacy…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"HO_0332_2324-Q4","year":2025,"name":"NATIONAL STRATEGIC AUTOMATIC NUMBER PLATE RECOGNITION PLATFORM (NSAP)","department":"HO","category":"Government Transformation and Service Delivery","description":"The National Strategic Automatic Number Plate Recognition Service ANPR (Automatic Number Plate Recognition) technology is used to help detect, deter and disrupt criminal activity at a local, regional and national level. It brings together a constant stream of live data from all police forces and a few Law Enforcement Agencies (LEAs). This data is fed into a central database and allows for various interrogations to be made against the data producing the results in the form of real time alerts, near real time searches and historic searching for vehicles of interest. This enables policing/LEAs to have the right information on time for intelligence on vehicle activity across the country and to effectively use it to protect the public, prevent crime and use the evidence for convictions in court.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Whilst there have been significant improvements with stakeholder engagement there are further work needed in this area. There are improvements required around planning, dependencies and programme governance. The review acknowledged the commitment of all the stakeholders to remaining delivery and congratulated the team on delivering the platform.","startDate":"2023-03-01","endDate":"2028-03-30","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 30/03/2028. This is primarily due to the following factors‚ The programme is still on track to deliver within the overall timelines.","fyBaseline":43.46,"fyForecast":29.86,"fyVariance":31.29,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The data feed project was delayed by 12 months due to issues identified resulting in a extended testing period.","wholeLifeCost":538.9,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 284 to 538. This is primarily due to the following factors‚ The Q4 FY23/24 Whole Life Cost of £284m does not include Optimism Bias. With Optimism Bias, the Whole Life Cost should be £609.63M. The Q4 FY2425 WLC should be £552.51m (incl OB) as reported on GRIP for that period. The drop in the WLC from Q4 FY2324 and Q4 FY2425 relates to the reduction of the Optimism Bias as many risks have been mitigated since plus revised assumptions and costs.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ Agreed Benefits remain at 0 as Benefits are not realised in this financial year","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Technical & integration"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Whilst there have been significant improvements with stakeholder engagement there are further work needed in this area. There are improvements required around…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"HO_0332_2324-Q4","year":2026,"name":"NATIONAL STRATEGIC AUTOMATIC NUMBER PLATE RECOGNITION PLATFORM (NSAP)","department":"HO","category":"Government Transformation and Service Delivery","description":"The National ANPR (Automatic Number Plate Recognition) Capability provides lines of enquiry and evidence in the investigation of crime and is used by forces throughout England, Wales and Scotland as well as approved Law Enforcement Agencies. The National Strategic ANPR Platform (NSAP) Programme is delivering the next generation of data store, integration and application capabilities to support Police and Law Enforcement in their public protection missions.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Exempt under Section 31 (1) - Law enforcement","startDate":"2023-03-01","endDate":"2030-03-30","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remains the same date (29/03/30)","fyBaseline":39.03,"fyForecast":36.73,"fyVariance":5.91,"varianceNarrative":"The budget variance only just exceeds 5%. This is primarily due to unforeseen pressures influencing in year forecasting.","wholeLifeCost":391.77,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 decreased from last year's WLC. This is primarily due to the reduction of the Optimism Bias.","benefits":35.68,"benefitsNarrative":"Exempt under Section 31 (1) - Law enforcement","themes":["Cost & funding"],"evidenceExcerpt":"Exempt under Section 31 (1) - Law enforcement Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remains the same date (29/03/30)","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"HO_0332_2324-Q4","year":2025,"name":"NATIONAL STRATEGIC AUTOMATIC NUMBER PLATE RECOGNITION PLATFORM (NSAP)","department":"HO","category":"Government Transformation and Service Delivery","description":"The National Strategic Automatic Number Plate Recognition Service ANPR (Automatic Number Plate Recognition) technology is used to help detect, deter and disrupt criminal activity at a local, regional and national level. It brings together a constant stream of live data from all police forces and a few Law Enforcement Agencies (LEAs). This data is fed into a central database and allows for various interrogations to be made against the data producing the results in the form of real time alerts, near real time searches and historic searching for vehicles of interest. This enables policing/LEAs to have the right information on time for intelligence on vehicle activity across the country and to effectively use it to protect the public, prevent crime and use the evidence for convictions in court.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Whilst there have been significant improvements with stakeholder engagement there are further work needed in this area. There are improvements required around planning, dependencies and programme governance. The review acknowledged the commitment of all the stakeholders to remaining delivery and congratulated the team on delivering the platform.","startDate":"2023-03-01","endDate":"2028-03-30","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 30/03/2028. This is primarily due to the following factors‚ The programme is still on track to deliver within the overall timelines.","fyBaseline":43.46,"fyForecast":29.86,"fyVariance":31.29,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The data feed project was delayed by 12 months due to issues identified resulting in a extended testing period.","wholeLifeCost":538.9,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 284 to 538. This is primarily due to the following factors‚ The Q4 FY23/24 Whole Life Cost of £284m does not include Optimism Bias. With Optimism Bias, the Whole Life Cost should be £609.63M. The Q4 FY2425 WLC should be £552.51m (incl OB) as reported on GRIP for that period. The drop in the WLC from Q4 FY2324 and Q4 FY2425 relates to the reduction of the Optimism Bias as many risks have been mitigated since plus revised assumptions and costs.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ Agreed Benefits remain at 0 as Benefits are not realised in this financial year","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Technical & integration"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Whilst there have been significant improvements with stakeholder engagement there are further work needed in this area. There are improvements required around…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":730,"attentionScore":40,"attentionReasons":["Current published delivery confidence is Amber","Published end date moved 730 days later","In-year forecast variance is +5.9%"]},{"id":"DFT_0052_2122-Q1","year":2026,"name":"EAST WEST RAIL CONNECTION STATE 2 AND 3","department":"DFT","category":"Infrastructure and Construction","description":"East West Rail (EWR) is a new railway connecting towns and cities across the Oxford-Cambridge growth corridor. The Government has identified the corridor as a key pillar of its economic growth mission – by delivering new east-west connectivity and removing existing constraints to growth, EWR is projected to support up to 100,000 new homes, tens of thousands of new jobs and it is expected to add £6.7bn to regional Gross Value Added each year by 2050. The EWR programme is structured around the phased introduction of passenger services from the mid 2020s to the mid-late 2030s. The railway will deliver shorter journey times between key economic centres; provide greener public transport and new paths for rail freight; and provide interchanges with major rail lines, supporting onward travel across the country. It will provide a total of 8 new stations and redevelop existing stations unlocking opportunities for growth/regeneration along the corridor. Phases 2 to 5 of the delivery programme (formerly Connection stages 2 and 3) will deliver new stations, the new line between Bedford and Cambridge and upgrade to the Marston Vale Line (Bletchley-Bedford). The future stages include delivering a new station on the East Coast Mainline at Tempsford (with construction starting by 2030); providing four trains per hour between Oxford-Stewartby (early 2030s) and Oxford-Bedford (mid 2030s); delivering a new station at Cambridge East (mid 2030s); and delivery of the new line (between Bedford-Cambridge), unlocking the full Oxford-Cambridge service (mid-late 2030s). This new sequencing was set out in the consultation published in April 2026 and accelerates the delivery of services and benefits along the route.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The assessment remains ‘Amber’. The April 2025 announcement of a Universal Destinations & Experiences (UDX) theme park to open near Bedford in 2031 has necessitated additional design work as set out in the Autumn Announcement in November 2025. Updated scope for the project has been set out in the final route-wide consultation in April 2026 and will subject to approval of the Development Consent Order and Full Business Case.","startDate":"2014-08-01","endDate":"2037-12-31","scheduleNarrative":"Future stages of the railway and delivery of the full Oxford-Cambridge service are subject to an application for a Development Consent Order (DCO) - the application is targeted for submission in 2027. Full completion of the project is planned for the mid-late 2030s. In line with the Government’s ambitions to speed up delivery of major infrastructure projects, certain parts of the project will now be accelerated to be delivered ahead of the mid-2030s, including a new ECML station at Tempsford and EWR services between Oxford and Stewartby serving the new Universal Studios Theme Park in Bedfordshire.","fyBaseline":177.26,"fyForecast":185.92,"fyVariance":4.89,"varianceNarrative":"The budget variance is less than or equal to 5%","wholeLifeCost":null,"costNarrative":"Exempt under Section 35 - Formulation of government policy, Section 43 - Commercial interests","benefits":6326.43,"benefitsNarrative":"Phases 2-5 of the EWR programme are in development, with benefit analysis work being undertaking to support the Outline Business case and Full Business Case being prepared to support investment decision making. Full benefits of the EWR programme will not be realised until the route to Cambridge is operational.","themes":["Approvals & decisions","Delivery & schedule","Scope & requirements","Commercial & supply chain"],"evidenceExcerpt":"The assessment remains ‘Amber’. The April 2025 announcement of a Universal Destinations & Experiences (UDX) theme park to open near Bedford in 2031 has necessitated additional design work as set out in the Autumn Announcement in November 2025. Updated scope for the project has been set out in the final route-wide consultation in April 2026 and will subject…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"DFT_0052_2122-Q1","year":2022,"name":"East West Rail Connection Stage 2 & 3","department":"DFT","category":"Infrastructure and Construction","description":"The East West Rail (EWR) scheme will create a rail link from Oxford to Cambridge. The project is structured around the phased introduction of services (Connection Stages). East West Rail Connection Stage 2 (CS2) predominantly upgrade existing infrastructure (between Bletchley and Bedford) to allow services between Oxford and Bedford. East West Rail CS3 involves building a new line, between Bedford and Cambridge, to extend the railway and facilitate services from Oxford to Cambridge.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 is Red. With the project in the concept and design phase, work continues to refine delivery strategies and the scope and to agree an affordable funding profile with HMT. A non-statutory consultation was completed in June 2021, and funding was gained as part of the 2021 Spending Review for further development work. Currently (Q4 FY 21/22) delivery approaches for this project are being reviewed. This is normal for a large complex project to ensure the business case remains viable. However, this does bring with it a degree of uncertainty over future plans, the scope, and how this project best delivers its intended benefits. The project RAG rating is therefore a natural reflection of this current uncertainty around the project's costs, schedule and scope.","startDate":"2014-08-01","endDate":null,"scheduleNarrative":"This project is still in the concept and design stage. There remains a degree of uncertainty around the overall project schedule, until further work has been completed to refine delivery options and the project's scope and a funding profile agreed with HMT. More detailed information will be provided in subsequent iterations of the IPA's annual report and via project led public engagement in due course.","fyBaseline":88.36,"fyForecast":74.64,"fyVariance":-15.0,"varianceNarrative":"The budget variance exceeds 5%. The variance is largely driven by slight delays to the procurement and onboarding of delivery partners as well as lower capital spend than originally forecast.","wholeLifeCost":null,"costNarrative":"This project is still in the concept and design stage with important scope decisions yet to be made. The cost range is estimated at £4-7bn. More detailed information will be provided in subsequent iterations of the IPA's annual report, and the funding required will be determined via business case processes.","benefits":null,"benefitsNarrative":"","themes":["Scope & requirements","Cost & funding","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 is Red. With the project in the concept and design phase, work continues to refine delivery strategies and the scope and to agree an affordable funding profile with HMT. A non-statutory consultation was completed in June 2021, and funding was gained as part of the 2021…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"DFT_0052_2122-Q1","year":2023,"name":"East West Rail Connection Stage 2 & 3","department":"DFT","category":"Infrastructure and Construction","description":"The East West Rail (EWR) scheme will create a rail link from Oxford to Cambridge. The project is structured around the phased introduction of services (Connection Stages). East West Rail Connection Stage 2 (CS2) predominantly upgrade existing infrastructure (between Bletchley and Bedford) to allow services between Oxford and Bedford. East West Rail CS3 involves building a new line, between Bedford and Cambridge, to extend the railway and facilitate services from Oxford to Cambridge.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 increased from Red (IPA rating) to Amber (SRO rating). This is primarily due to the following factors. Following a review of the programme, Government recommitted to East West Rail with the March 2023 Budget noting a public announcement on the route would be made in May 2023. Cross-government discussions are taking place how to support local authorities bringing forward plans for strategic economic development around stations on the route (c15m of funding was announced at Budget for this) to ensure benefits will be realised. The delivery programme is now being re-baselined with the aim for a Development Consent Order submission in 2025 with increased confidence in benefits delivery.","startDate":"2014-08-01","endDate":"2030-10-09","scheduleNarrative":"The project's end-date at 22/23-Q4 is 2030-10-09. This is primarily due to the following factors. This project is still in the concept and design stage. There remains a degree of uncertainty around the overall project schedule, until further work has been completed to refine delivery options and the projects scope and a funding profile agreed with HMT. More detailed information will be provided in subsequent iterations of the IPAs annual report and via project led public engagement in due course.","fyBaseline":162.26,"fyForecast":49.72,"fyVariance":-69.0,"varianceNarrative":"The budget variance exceeds 5%. Variance of anticipated spend is primarily due to a review of the schemes priority leading to slower progress than originally anticipated.","wholeLifeCost":3970.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 22/23-Q4 is 3970m. This is primarily due to the following factors. This project is still in the concept and design stage with important scope decisions yet to be made. The cost range is estimated at 4-7bn. More detailed information will be provided in subsequent iterations of the IPAs annual report, and the funding required will be determined via business case processes.","benefits":10961.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 10961m. No annual return benefits narrative provided. EWR can unlock wider benefits (economic growth, jobs, housing). Final benefits realization remains uncertain.","themes":["Cost & funding","Delivery & schedule","Scope & requirements","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 increased from Red (IPA rating) to Amber (SRO rating). This is primarily due to the following factors. Following a review of the programme, Government recommitted to East West Rail with the March 2023 Budget noting a public announcement on the route would be made in…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"DFT_0052_2122-Q1","year":2024,"name":"East West Rail Connection Stage 2 & 3","department":"DFT","category":"Infrastructure and Construction","description":"The East West Rail (EWR) scheme will create a rail link from Oxford to Cambridge. The project is structured around the phased introduction of services (Connection Stages). _x000D_ East West Rail Connection Stage 2 (CS2) predominantly upgrade existing infrastructure (between Bletchley and Bedford) to allow services between Oxford and Bedford. East West Rail CS3 involves building a new line, between Bedford and Cambridge, to extend the railway and facilitate services from Oxford to Cambridge.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The project is currently being re-baselined following the recommitment to the programme and the route update announcement. _x000D_ EWR Co is now planning for two Statutory Consultations for CS2/3 ahead of an OBC and DCO application. _x000D_ Cross-government discussions are being led by HMT through a new EWR economic growth board on how to maximise the opportunities EWR can unlock. The Budget announced up to 15m of funding for local authorities for this and the first stage of work is progressing on developing local visions for growth around stations. _x000D_ As part of the Spring Budget on 6 March 2024, the Chancellor announced delivery of works on the Marston Vale Line of East West Rail will be bought forward, supported by 240m. These works will enable the service between Oxford and Bedford to commence by the end of the decade.","startDate":"2014-08-01","endDate":"2030-10-09","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2030-10-09. This is primarily due to the following factors. This project is still in the concept and design stage. There remains a degree of uncertainty around the overall project schedule, until further work has been completed to refine delivery options and the project's scope and a funding profile agreed with HMT. More detailed information will be provided in subsequent iterations of the IPA's annual report and via project led public engagement in due course.","fyBaseline":175.29,"fyForecast":90.15,"fyVariance":-49.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. Variance of anticipated spend is primarily due to a review of the scheme's priority leading to slower progress than originally anticipated.","wholeLifeCost":3970.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 remained at 3970m. This is primarily due to the following factors. This project is still in the concept and design stage with important scope decisions yet to be made. The cost range is estimated at 4-7bn. More detailed information will be provided in subsequent iterations of the IPA's annual report, and the funding required will be determined via business case processes.","benefits":10961.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 10961m. No annual return benefits provided. EWR can unlock wider benefits (economic growth, jobs, housing). Final benefits realisation remains uncertain.","themes":["Cost & funding","Delivery & schedule","Scope & requirements","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The project is currently being re-baselined following the recommitment to the programme and the route update announcement. _x000D_ EWR Co is now planning for two Statutory…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"DFT_0052_2122-Q1","year":2025,"name":"EAST WEST RAIL CONNECTION STATE 2 AND 3","department":"DfT","category":"Infrastructure and Construction","description":"The East West Rail (EWR) scheme will create a rail link from Oxford to Cambridge. The project is structured around the phased introduction of services (Connection Stages). East West Rail Connection Stage 2 (CS2) predominantly upgrade existing infrastructure (between Bletchley and Bedford) to allow services between Oxford and Bedford. East West Rail CS3 involves building a new line, between Bedford and Cambridge, to extend the railway and facilitate services from Oxford to Cambridge.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The project is currently being re-baselined following the re-commitment to the programme and the route update announcement. The development of the relationship between Sponsor team and ALB is good, and work on the Key Strategic Assumptions and decisions are being worked through to be defined, agreed and baselined. EWR Co undertook a non-statutory consultation at the end of 2025 and an update report was published in May 2025. Planning is now underway for a Statutory Consultation for CS2/3 ahead of an OBC and DCO application. As part of the Spring Budget in 2025, the Chancellor re-committed to the delivery of works on the Marston Vale Line of East West Rail. These works will enable the service between Oxford and Bedford to commence by the end of the decade.","startDate":"2014-08-01","endDate":"2030-10-09","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 09/10/2030. This is primarily due to the following factors‚ This project is still in the concept and design stage. There remains a degree of uncertainty around the overall project schedule, until further work has been completed to refine delivery options and the project’s scope and a funding profile agreed with HMT. More detailed information will be provided in subsequent iterations of the IPA’s annual report and via project led public engagement in due course.","fyBaseline":175.29,"fyForecast":90.15,"fyVariance":48.57,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ Variance of anticipated spend is primarily due to a review of the scheme’s priority leading to slower progress than originally anticipated.","wholeLifeCost":3970.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 3970. This is primarily due to the following factors‚ This project is still in the concept and design stage with important scope decisions yet to be made. The cost range is estimated at £4-7bn. More detailed information will be provided in subsequent iterations of the IPA’s annual report, and the funding required will be determined via business case processes.","benefits":10961.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 10961. This is primarily due to the following factors‚ Wider benefits (delivery of housing, high value jobs) will fall under the delivery umbrella of the later connection stages. This requires cross-government (MHCLG, and LPV's team in HMT) coordination with sufficient resourcing, support to local places and where appropriate negotiation with the private sector to unlock land value. For the MVL/Bedford specifically, consideration in unlocking any benefits along the MVL to fit with future service provision. Regeneration opportunities at Bedford linked to wider Town Deal aspirations that could impact of the railway scope/station design, where funded by third party.","themes":["Cost & funding","Delivery & schedule","Scope & requirements","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The project is currently being re-baselined following the re-commitment to the programme and the route update announcement. The development of the relationship…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"DFT_0052_2122-Q1","year":2026,"name":"EAST WEST RAIL CONNECTION STATE 2 AND 3","department":"DFT","category":"Infrastructure and Construction","description":"East West Rail (EWR) is a new railway connecting towns and cities across the Oxford-Cambridge growth corridor. The Government has identified the corridor as a key pillar of its economic growth mission – by delivering new east-west connectivity and removing existing constraints to growth, EWR is projected to support up to 100,000 new homes, tens of thousands of new jobs and it is expected to add £6.7bn to regional Gross Value Added each year by 2050. The EWR programme is structured around the phased introduction of passenger services from the mid 2020s to the mid-late 2030s. The railway will deliver shorter journey times between key economic centres; provide greener public transport and new paths for rail freight; and provide interchanges with major rail lines, supporting onward travel across the country. It will provide a total of 8 new stations and redevelop existing stations unlocking opportunities for growth/regeneration along the corridor. Phases 2 to 5 of the delivery programme (formerly Connection stages 2 and 3) will deliver new stations, the new line between Bedford and Cambridge and upgrade to the Marston Vale Line (Bletchley-Bedford). The future stages include delivering a new station on the East Coast Mainline at Tempsford (with construction starting by 2030); providing four trains per hour between Oxford-Stewartby (early 2030s) and Oxford-Bedford (mid 2030s); delivering a new station at Cambridge East (mid 2030s); and delivery of the new line (between Bedford-Cambridge), unlocking the full Oxford-Cambridge service (mid-late 2030s). This new sequencing was set out in the consultation published in April 2026 and accelerates the delivery of services and benefits along the route.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The assessment remains ‘Amber’. The April 2025 announcement of a Universal Destinations & Experiences (UDX) theme park to open near Bedford in 2031 has necessitated additional design work as set out in the Autumn Announcement in November 2025. Updated scope for the project has been set out in the final route-wide consultation in April 2026 and will subject to approval of the Development Consent Order and Full Business Case.","startDate":"2014-08-01","endDate":"2037-12-31","scheduleNarrative":"Future stages of the railway and delivery of the full Oxford-Cambridge service are subject to an application for a Development Consent Order (DCO) - the application is targeted for submission in 2027. Full completion of the project is planned for the mid-late 2030s. In line with the Government’s ambitions to speed up delivery of major infrastructure projects, certain parts of the project will now be accelerated to be delivered ahead of the mid-2030s, including a new ECML station at Tempsford and EWR services between Oxford and Stewartby serving the new Universal Studios Theme Park in Bedfordshire.","fyBaseline":177.26,"fyForecast":185.92,"fyVariance":4.89,"varianceNarrative":"The budget variance is less than or equal to 5%","wholeLifeCost":null,"costNarrative":"Exempt under Section 35 - Formulation of government policy, Section 43 - Commercial interests","benefits":6326.43,"benefitsNarrative":"Phases 2-5 of the EWR programme are in development, with benefit analysis work being undertaking to support the Outline Business case and Full Business Case being prepared to support investment decision making. Full benefits of the EWR programme will not be realised until the route to Cambridge is operational.","themes":["Approvals & decisions","Delivery & schedule","Scope & requirements","Commercial & supply chain"],"evidenceExcerpt":"The assessment remains ‘Amber’. The April 2025 announcement of a Universal Destinations & Experiences (UDX) theme park to open near Bedford in 2031 has necessitated additional design work as set out in the Autumn Announcement in November 2025. Updated scope for the project has been set out in the final route-wide consultation in April 2026 and will subject…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"DFT_0052_2122-Q1","year":2025,"name":"EAST WEST RAIL CONNECTION STATE 2 AND 3","department":"DfT","category":"Infrastructure and Construction","description":"The East West Rail (EWR) scheme will create a rail link from Oxford to Cambridge. The project is structured around the phased introduction of services (Connection Stages). East West Rail Connection Stage 2 (CS2) predominantly upgrade existing infrastructure (between Bletchley and Bedford) to allow services between Oxford and Bedford. East West Rail CS3 involves building a new line, between Bedford and Cambridge, to extend the railway and facilitate services from Oxford to Cambridge.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The project is currently being re-baselined following the re-commitment to the programme and the route update announcement. The development of the relationship between Sponsor team and ALB is good, and work on the Key Strategic Assumptions and decisions are being worked through to be defined, agreed and baselined. EWR Co undertook a non-statutory consultation at the end of 2025 and an update report was published in May 2025. Planning is now underway for a Statutory Consultation for CS2/3 ahead of an OBC and DCO application. As part of the Spring Budget in 2025, the Chancellor re-committed to the delivery of works on the Marston Vale Line of East West Rail. These works will enable the service between Oxford and Bedford to commence by the end of the decade.","startDate":"2014-08-01","endDate":"2030-10-09","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 09/10/2030. This is primarily due to the following factors‚ This project is still in the concept and design stage. There remains a degree of uncertainty around the overall project schedule, until further work has been completed to refine delivery options and the project’s scope and a funding profile agreed with HMT. More detailed information will be provided in subsequent iterations of the IPA’s annual report and via project led public engagement in due course.","fyBaseline":175.29,"fyForecast":90.15,"fyVariance":48.57,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ Variance of anticipated spend is primarily due to a review of the scheme’s priority leading to slower progress than originally anticipated.","wholeLifeCost":3970.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 3970. This is primarily due to the following factors‚ This project is still in the concept and design stage with important scope decisions yet to be made. The cost range is estimated at £4-7bn. More detailed information will be provided in subsequent iterations of the IPA’s annual report, and the funding required will be determined via business case processes.","benefits":10961.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 10961. This is primarily due to the following factors‚ Wider benefits (delivery of housing, high value jobs) will fall under the delivery umbrella of the later connection stages. This requires cross-government (MHCLG, and LPV's team in HMT) coordination with sufficient resourcing, support to local places and where appropriate negotiation with the private sector to unlock land value. For the MVL/Bedford specifically, consideration in unlocking any benefits along the MVL to fit with future service provision. Regeneration opportunities at Bedford linked to wider Town Deal aspirations that could impact of the railway scope/station design, where funded by third party.","themes":["Cost & funding","Delivery & schedule","Scope & requirements","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The project is currently being re-baselined following the re-commitment to the programme and the route update announcement. The development of the relationship…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":2640,"attentionScore":38,"attentionReasons":["Current published delivery confidence is Amber","Published end date moved 2,640 days later"]},{"id":"DEFRA_0008_2021-Q1","year":2026,"name":"FARMING AND COUNTRYSIDE PROGRAMME","department":"DEFRA","category":"Government Transformation and Service Delivery","description":"By 2028, the Farming and Countryside Programme aims to deliver: 1) A renewed agricultural sector, producing healthy food for consumption at home and abroad, where farms can be profitable and economically sustainable without subsidy 2) Farming and the countryside contributing significantly to environmental goals including addressing climate change","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Red. The issues that drove the original Red rating have largely been resolved. Policy is now stable, a credible delivery pathway is in place, and delivery confidence has been strengthened through the successful launch of Capital Grants, completion of applications for customers affected by the closure of SFI24, progress on the Countryside Stewardship offer and a Spending Review settlement that supports risk management and stakeholder engagement. FCP remains at Red due to a new set of issues identified through a NISTA-style review in Q1 and Q2 of 25/26. This found scope had expanded beyond the original programme remit, with blurred boundaries between transformation and business-as-usual leading to spend on activities outside the programme. These issues have also now been substantially addressed. Scope has been reset to focus on delivery of ELM schemes in 2026 and the design and establishment of the underpinning digital service. Accountability has been clarified including through the creation of the Farming Directorate (FD) which is now responsible for the farming budget and ongoing scheme management post programme closure. Digitally-enabled transformation of farming grant and scheme services will be delivered through a separate programme. This will ensure it is equipped with the tailored tools, approaches and accountabilities it needs to succeed. Consequent to progress made, an independent NISTA-style review scheduled for April 2026 is expected to support a change to our DCA category.","startDate":"2017-05-01","endDate":"2028-12-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same at 31/12/2028. While the programme remains at RED, this has not impacted the programmes end date. Following the revised scope for the remainder of the GMPP scope delivery, we now have a more defined path to AMBER which will ensure the programme delivery remains on track to deliver to schedule.","fyBaseline":2843.27,"fyForecast":2576.43,"fyVariance":9.38,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":25494.95,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) remained at 24,875. The costs are split into two main sections, payments to beneficiaries (scheme costs) and the costs of delivering those schemes together with policy and programme support (administrative costs). Both are linked to SR25 settlements.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 are no longer being calculated. This is primarily due to the following factors. Previously reported benefits were drawn from phase 2 Programme Business Case analysis (produced in 2021) and are not reflective of the many changes to the programme's plans and actual delivery since they were produced. So, we now report that the monetised benefits of the current programme and its expected future rollout are not calculated. Updated programme level lifetime analysis will be provided when this is produced and approved at a working level, department level, and HMT level accordingly.","themes":["Delivery & schedule","Cost & funding","Scope & requirements","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Red. The issues that drove the original Red rating have largely been resolved. Policy is now stable, a credible delivery pathway is in place, and delivery confidence has been strengthened through the successful launch of Capital Grants,…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"DEFRA_0008_2021-Q1","year":2021,"name":"Future Farming and Countryside Programme","department":"DEFRA","category":"Government Transformation and Service Delivery","description":"By 2028, the Future Farming and Countryside Programme aims to deliver: 1) A renewed agricultural sector, producing healthy food for consumption at home and abroad, where farms can be profitable and economically sustainable without subsidy 2) Farming and the countryside contributing significantly to environmental goals including addressing climate change","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber.This is primarily due to the following factors: The Future Farming and Countryside Programme's Delivery Confidence Assessment remains Amber in line with the IPA Programme Assessment Review in August 2020. The Programme has effectively responded to the recommendations from this Review and the Major Projects Review Group conditions, as set out in August/September 2020 respectively, and continues to increase delivery confidence. With active reprioritisation to mitigate the effects of ongoing Covid19 lockdown impacts the Programme has successfully maintained progress against critical path delivery. In November 2020, 'The Path to Sustainable Farming: An Agricultural Transition Plan', was published, setting out the vision for the future. Since then, the Programme has launched a pilot of the first of three environmental land management schemes, the Sustainable Farming Incentive, which is the first step on the road to truly sustainable farming.","startDate":"2017-05-01","endDate":"2028-12-31","scheduleNarrative":"The project end-date is 31 December 2028. This is primarily due to the following factors: We are embarking on these ambitious and much needed reforms amid an uncertain wider economic and policy context for the agricultural sector, as we discuss new trade deals and develop policy around net zero. This presents challenges we will have to navigate carefully. We are taking a co-design, test and learn approach which means we will monitor how the programme is landing and adjust course as needed.","fyBaseline":2701.09,"fyForecast":2731.22,"fyVariance":1.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":24629.59,"costNarrative":"The projects Baseline Whole Life Cost is �24629.59m. This is primarily due to the following factors: Costs are split into two main sections, the projected payment streams to beneficiaries (scheme costs), as well as estimating the associated future delivery, programme support and one-off implementation costs to deliver the Future Farming & Countryside programme (administrative costs). Scheme costs are linked to the quantification of the manifesto commitment to guarantee the current annual budget to farmers in every year of this Parliament. This includes Non-Gov costs in relation to EU funding that will still be accessible under the terms of the Withdrawal Agreement, which will be available during 20/21, 21/22 and 22/23. Administrative costs are made up of scheme running costs, corporate service charges, depreciation charges, programme support costs and implementation costs.","benefits":null,"benefitsNarrative":"","themes":["Delivery & schedule","Cost & funding","Governance & assurance","Scope & requirements"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber.This is primarily due to the following factors: The Future Farming and Countryside Programme's Delivery Confidence Assessment remains Amber in line with the IPA Programme Assessment Review in August 2020. The Programme has effectively responded to the recommendations from…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21"},{"id":"DEFRA_0008_2021-Q1","year":2022,"name":"Future Farming and Countryside Programme","department":"DEFRA","category":"Government Transformation and Service Delivery","description":"By 2028, the Future Farming and Countryside Programme aims to deliver: 1) A renewed agricultural sector, producing healthy food for consumption at home and abroad, where farms can be profitable and economically sustainable without subsidy 2) Farming and the countryside contributing significantly to environmental goals including addressing climate change","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 remained at Amber Planning for derailment: Contingency Scenario Planning Framework developed for rollout. Currently testing with options to respond to Ukraine Crisis impact on farming Scope Management: Change Control process embedded. Now developing a decision-making framework to build into Lifecycle and Policy pipeline assessments Agile transition: Agile coaching / training across programme. Process and decision-taking revised to reflect new approach. Learning embedded into Programme restructure around Single Service; regular communications events and SharePoint information sharing alongside, with focus on impacts on individuals and teams to bring internal users along the journey. Operational delivery: Work continues with planning deep dives to assess delivery confidence and alignment to Critical Timeline. Planning templates were updated with Transition to Operations, Closure, Handover, and planning for Benefits. Milestones and RAIDD are extracted from plans to assess deliverability, consistency and inform Critical Timeline. Delivery Partners embedded in project teams and planning requirements.","startDate":"2017-05-01","endDate":"2028-12-31","scheduleNarrative":"Compared to 2021-Q4, your project end-date remained scheduled to finish on 31 DEC 2028 . This is primarily due to the following factors: The department continues to deliver the planned reforms and although some changes to plans have been made as part of our test and learn approach, delivery is on track for the critical path milestones, costs and benefits.","fyBaseline":2299.31,"fyForecast":2247.41,"fyVariance":-2.0,"varianceNarrative":"The budget variance is inferior or equal to 5%.","wholeLifeCost":24864.0,"costNarrative":"Compared to2021-Q4, the projects Baseline Whole Life Cost increased from 24629.59 (£m) to 24864.26 (£m). This is primarily due to the following factors: The costs are split into two main sections, payments to beneficiaries (scheme costs) and the costs of delivering those schemes together with policy and programme support (administrative costs).The value of the scheme costs will be linked to the definition of the manifesto commitment to guarantee the current annual budget to farmers in every year of this Parliament.","benefits":null,"benefitsNarrative":"","themes":["Delivery & schedule","Cost & funding","Approvals & decisions","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 remained at Amber Planning for derailment: Contingency Scenario Planning Framework developed for rollout. Currently testing with options to respond to Ukraine Crisis impact on farming Scope Management: Change Control process…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"DEFRA_0008_2021-Q1","year":2023,"name":"Farming and Countryside Programme","department":"DEFRA","category":"Government Transformation and Service Delivery","description":"By 2028, the Farming and Countryside Programme aims to deliver: 1) A renewed agricultural sector, producing healthy food for consumption at home and abroad, where farms can be profitable and economically sustainable without subsidy 2) Farming and the countryside contributing significantly to environmental goals including addressing climate change","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. Programme remains deliverable with majority of critical outcomes on track and expected challenges being managed.Weve: * Launched the Lump Sum Exit Scheme * Tree Health Pilot went live * Successful launch of Sustainable Farming Incentive early rollout phase 1 followed by opening for applications and then allowing those in existing stewardship agreements to apply directly online* Soft launch of Farming Investment Fund Adding Value, online eligibility checker and applications.* Countryside Stewardship 2024 policy proposal and Countryside Stewardship 2022 facilitation fund approved by Minister and payments rates for Countryside Stewardship 2024 agreed in principle* First Vet Visit took place in September, private beta launched in OctoberIPA Review resulted in a very positive report (Amber rating), noting good progress in the last year and supporting the direction of travel towards embedding the one-team way of working in the Sustainable Farming Incentive delivery space to enable efficiency in decision-making and join-up with delivery partners","startDate":"2017-05-01","endDate":"2028-12-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2028-12-31. This is primarily due to the following factors. The department continues to deliver the planned reforms and although some changes to plans have been made as part of our test and learn approach, delivery is on track for the critical path milestones, costs and benefits.","fyBaseline":2638.03,"fyForecast":2535.45,"fyVariance":-4.0,"varianceNarrative":"The budget variance is inferior or equal to 5%.","wholeLifeCost":24875.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 increased from 24864m. to 24875m. This is primarily due to the following factors. The costs are split into two main sections, payments to beneficiaries (scheme costs) and the costs of delivering those schemes together with policy and programme support (administrative costs).The value of the scheme costs will be linked to the definition of the manifesto commitment to guarantee the current annual budget to farmers in every year of this Parliament.","benefits":58865.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 58865m. The project's departmental-agree monetised benefits at 22/23-Q4 is 58865m.The project's departmental-agree monetised benefits at 22/23-Q4 is 58865m.The project's departmental-agree monetised benefits at 22/23-Q4 is 58865m. The total project Baseline Monetised Benefits are 58.86bn. These benefits are from the approved Phase 2 Business Case from September 2021 these figures do not reflect changes in the programme since then, however, updated figures will be provided going forwards. The benefits presented here have been calculated bottom-up by scheme and totalled across the programme. This is a cautious estimate as not all schemes have monetised benefits and, for some schemes, benefits have been calculated from the year of spend but do not necessarily materialise in that year of spend.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. Programme remains deliverable with majority of critical outcomes on track and expected challenges being managed.Weve: * Launched the Lump Sum Exit Scheme * Tree…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"DEFRA_0008_2021-Q1","year":2024,"name":"Farming and Countryside Programme","department":"DEFRA","category":"Government Transformation and Service Delivery","description":"By 2028, the Farming and Countryside Programme aims to deliver: 1) A renewed agricultural sector, producing healthy food for consumption at home and abroad, where farms can be profitable and economically sustainable without subsidy 2) Farming and the countryside contributing significantly to environmental goals including addressing climate change","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. Programme remains deliverable with majority of critical outcomes on track and expected challenges being managed._x000D_ We've:_x000D_ _x000D_ . Opened Countryside Stewardship 2024 Mid-tier scheme for agreements starting in January 2024 and the CS Facilitation Fund opened in October._x000D_ . Invited 374 projects to submit Slurry Infrastructure Grant full applications and funding approved for Phase II of the Slurry Investment fund._x000D_ . Launched Water Management grants round 2 scheme._x000D_ . 22 projects in Landscape Recovery Round 1 had grant agreements and moved into the 2-year Project Development phase. Round 2 was launched with 34 successful applications._x000D_ . Since opening for applications, the Sustainable Farming Incentive (SFI) has received 17,466 applications and issued 16,160 agreement offers. We have exceeded our central scenario for the number and value of applications during the financial year.","startDate":"2017-05-01","endDate":"2028-12-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2028-12-31. This is primarily due to the following factors. The department continues to deliver the planned reforms and although some changes to plans have been made as part of our test and learn approach, delivery is on track for the critical path milestones, costs and benefits.","fyBaseline":2788.03,"fyForecast":2529.67,"fyVariance":-9.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The costs of the Farming and Countryside Programme include amounts that are paid to beneficiaries and the associated delivery of the programme. The original baseline for 23/24 of 2,788m is comprised of 2,116m RDEL and 672m CDEL. The forecast of 2,529m is comprised of 2,152m RDEL and 377m CDEL. This represents an overall variance of 259m._x000D_ _x000D_ The programme has an aspiration to deliver on the manifesto commitment to spend on average 2.4bn a year across this Parliament on payments to beneficiaries and agreed flexibility between years to do this. 248m of payments to beneficiaries has been re-profiled from 23/24 to 24/25 to ensure that the programme continues to deliver its intended outcomes._x000D_ _x000D_ This has seen the forecast for 24/25 being 3,060m, comprised of 2,279m RDEL and 781m CDEL, compared to the original baseline of 2,824m, comprised of 2,085m RDEL and 739m CDEL. This represents an overall variance of 236m.","wholeLifeCost":24875.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 remained at 24875m. This is primarily due to the following factors. The costs are split into two main sections, payments to beneficiaries (scheme costs) and the costs of delivering those schemes together with policy and programme support (administrative costs).The value of the scheme costs will be linked to the definition of the manifesto commitment to guarantee the current annual budget to farmers in every year of this Parliament.","benefits":58865.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 58865m. The total project Baseline Monetised Benefits are 58.86bn. These benefits are from the approved Phase 2 Business Case from September 2021 - these figures do not reflect changes in the programme since then, however, updated figures will be provided going forwards. The benefits presented here have been calculated bottom-up by scheme and totalled across the programme. This is a cautious estimate as not all schemes have monetised benefits and, for some schemes, benefits have been calculated from the year of spend but do not necessarily materialise in that year of spend.","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. Programme remains deliverable with majority of critical outcomes on track and expected challenges being managed._x000D_ We've:_x000D_ _x000D_ . Opened Countryside…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"DEFRA_0008_2021-Q1","year":2025,"name":"FARMING AND COUNTRYSIDE PROGRAMME","department":"DEFRA","category":"Government Transformation and Service Delivery","description":"By 2028, the Farming and Countryside Programme aims to deliver: 1) A renewed agricultural sector, producing healthy food for consumption at home and abroad, where farms can be profitable and economically sustainable without subsidy 2) Farming and the countryside contributing significantly to environmental goals including addressing climate change.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 decreased from AMBER to RED. Delivery risk continued to rise. The closure of the Sustainable Farming Initiative (SFI) to new applicants disrupted delivery timelines. Defra were unable to re-plan with confidence until the funding position was clarified through Spending Review Phase 2 (SR2). There was no longer a plausible pathway to the scheme uptake and outcomes set out in our Programme Business Case (PBC). The PBC assumed a higher level of funding and uptake than was expected in April 2025, particularly for SFI. Farmers’ willingness to participate in schemes was harder to predict at that point because of recent external factors such as the impact of inheritance tax changes and the closure of the 2024 SFI scheme to new applicants in March 2025; and there was uncertainty over when Countryside Stewardship Higher Tier (CSHT) would be delivered. More broadly, the wider strategic context within which the Programme is operating has also shifted significantly and isn’t expected to settle until later in the year pending publication of the Food Strategy, the revised Environmental Improvement Plan, the Land Use Framework and the Farming Roadmap. Defra is working closely with NISTA to shape our next steps, including the development of a targeted remediation plan in order to address residual concerns underpinning this assessment and cement a pathway back to AMBER. Some key upcoming developments in the coming months which would help address some of the issues regarding delivery confidence, stakeholder concerns and the willingness of farmers to participate in schemes would include: • a positive SR2 settlement for the Programme that clarifies the funding position and provides a basis for improved management of the funding risk and related stakeholder concerns • successful reopening of the Capital Grants offer, evidenced by the demand levels for that scheme • successful delivery of SFI 2024 and management of the cohort who were unable to complete an application prior to the scheme closing • clearer communications about when the Countryside Stewardship Higher Tier scheme would open.","startDate":"2017-05-01","endDate":"2028-12-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/12/2028. The change of Programme status from Amber to Red has not impacted the projects end date. A remediation plan is being put in place to ensure that the programme remains on track to deliver to schedule.","fyBaseline":2824.17,"fyForecast":3005.67,"fyVariance":6.43,"varianceNarrative":"The budget variance exceeds 5%. £248m from the 23/24 budget was moved into 24/25 to maintain the commitment to spend on average c. £2.4bn a year on the farming budget across the previous Parliament (20/21 to 24/25).","wholeLifeCost":24875.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 24875. The costs are split into two main sections, payments to beneficiaries (scheme costs) and the costs of delivering those schemes together with policy and programme support (administrative costs). The value of the scheme costs will be linked to the definition of the manifesto commitment to guarantee the current annual budget to farmers in every year of this Parliament.","benefits":58864.9,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 58865. The benefits estimate is based on economic appraisal of likely benefits of the Programme, as set out in the FCP Phase 2 Programme Business Case, agreed September 2021. These figures have not been updated to reflect changes in the Programme since then, due to ongoing uncertainty. The benefits presented here have been calculated bottom-up by scheme and totalled across the programme.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 decreased from AMBER to RED. Delivery risk continued to rise. The closure of the Sustainable Farming Initiative (SFI) to new applicants disrupted delivery timelines. Defra were unable to re-plan with confidence until the funding…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"DEFRA_0008_2021-Q1","year":2026,"name":"FARMING AND COUNTRYSIDE PROGRAMME","department":"DEFRA","category":"Government Transformation and Service Delivery","description":"By 2028, the Farming and Countryside Programme aims to deliver: 1) A renewed agricultural sector, producing healthy food for consumption at home and abroad, where farms can be profitable and economically sustainable without subsidy 2) Farming and the countryside contributing significantly to environmental goals including addressing climate change","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Red. The issues that drove the original Red rating have largely been resolved. Policy is now stable, a credible delivery pathway is in place, and delivery confidence has been strengthened through the successful launch of Capital Grants, completion of applications for customers affected by the closure of SFI24, progress on the Countryside Stewardship offer and a Spending Review settlement that supports risk management and stakeholder engagement. FCP remains at Red due to a new set of issues identified through a NISTA-style review in Q1 and Q2 of 25/26. This found scope had expanded beyond the original programme remit, with blurred boundaries between transformation and business-as-usual leading to spend on activities outside the programme. These issues have also now been substantially addressed. Scope has been reset to focus on delivery of ELM schemes in 2026 and the design and establishment of the underpinning digital service. Accountability has been clarified including through the creation of the Farming Directorate (FD) which is now responsible for the farming budget and ongoing scheme management post programme closure. Digitally-enabled transformation of farming grant and scheme services will be delivered through a separate programme. This will ensure it is equipped with the tailored tools, approaches and accountabilities it needs to succeed. Consequent to progress made, an independent NISTA-style review scheduled for April 2026 is expected to support a change to our DCA category.","startDate":"2017-05-01","endDate":"2028-12-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same at 31/12/2028. While the programme remains at RED, this has not impacted the programmes end date. Following the revised scope for the remainder of the GMPP scope delivery, we now have a more defined path to AMBER which will ensure the programme delivery remains on track to deliver to schedule.","fyBaseline":2843.27,"fyForecast":2576.43,"fyVariance":9.38,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":25494.95,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) remained at 24,875. The costs are split into two main sections, payments to beneficiaries (scheme costs) and the costs of delivering those schemes together with policy and programme support (administrative costs). Both are linked to SR25 settlements.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 are no longer being calculated. This is primarily due to the following factors. Previously reported benefits were drawn from phase 2 Programme Business Case analysis (produced in 2021) and are not reflective of the many changes to the programme's plans and actual delivery since they were produced. So, we now report that the monetised benefits of the current programme and its expected future rollout are not calculated. Updated programme level lifetime analysis will be provided when this is produced and approved at a working level, department level, and HMT level accordingly.","themes":["Delivery & schedule","Cost & funding","Scope & requirements","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Red. The issues that drove the original Red rating have largely been resolved. Policy is now stable, a credible delivery pathway is in place, and delivery confidence has been strengthened through the successful launch of Capital Grants,…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"DEFRA_0008_2021-Q1","year":2025,"name":"FARMING AND COUNTRYSIDE PROGRAMME","department":"DEFRA","category":"Government Transformation and Service Delivery","description":"By 2028, the Farming and Countryside Programme aims to deliver: 1) A renewed agricultural sector, producing healthy food for consumption at home and abroad, where farms can be profitable and economically sustainable without subsidy 2) Farming and the countryside contributing significantly to environmental goals including addressing climate change.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 decreased from AMBER to RED. Delivery risk continued to rise. The closure of the Sustainable Farming Initiative (SFI) to new applicants disrupted delivery timelines. Defra were unable to re-plan with confidence until the funding position was clarified through Spending Review Phase 2 (SR2). There was no longer a plausible pathway to the scheme uptake and outcomes set out in our Programme Business Case (PBC). The PBC assumed a higher level of funding and uptake than was expected in April 2025, particularly for SFI. Farmers’ willingness to participate in schemes was harder to predict at that point because of recent external factors such as the impact of inheritance tax changes and the closure of the 2024 SFI scheme to new applicants in March 2025; and there was uncertainty over when Countryside Stewardship Higher Tier (CSHT) would be delivered. More broadly, the wider strategic context within which the Programme is operating has also shifted significantly and isn’t expected to settle until later in the year pending publication of the Food Strategy, the revised Environmental Improvement Plan, the Land Use Framework and the Farming Roadmap. Defra is working closely with NISTA to shape our next steps, including the development of a targeted remediation plan in order to address residual concerns underpinning this assessment and cement a pathway back to AMBER. Some key upcoming developments in the coming months which would help address some of the issues regarding delivery confidence, stakeholder concerns and the willingness of farmers to participate in schemes would include: • a positive SR2 settlement for the Programme that clarifies the funding position and provides a basis for improved management of the funding risk and related stakeholder concerns • successful reopening of the Capital Grants offer, evidenced by the demand levels for that scheme • successful delivery of SFI 2024 and management of the cohort who were unable to complete an application prior to the scheme closing • clearer communications about when the Countryside Stewardship Higher Tier scheme would open.","startDate":"2017-05-01","endDate":"2028-12-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/12/2028. The change of Programme status from Amber to Red has not impacted the projects end date. A remediation plan is being put in place to ensure that the programme remains on track to deliver to schedule.","fyBaseline":2824.17,"fyForecast":3005.67,"fyVariance":6.43,"varianceNarrative":"The budget variance exceeds 5%. £248m from the 23/24 budget was moved into 24/25 to maintain the commitment to spend on average c. £2.4bn a year on the farming budget across the previous Parliament (20/21 to 24/25).","wholeLifeCost":24875.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 24875. The costs are split into two main sections, payments to beneficiaries (scheme costs) and the costs of delivering those schemes together with policy and programme support (administrative costs). The value of the scheme costs will be linked to the definition of the manifesto commitment to guarantee the current annual budget to farmers in every year of this Parliament.","benefits":58864.9,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 58865. The benefits estimate is based on economic appraisal of likely benefits of the Programme, as set out in the FCP Phase 2 Programme Business Case, agreed September 2021. These figures have not been updated to reflect changes in the Programme since then, due to ongoing uncertainty. The benefits presented here have been calculated bottom-up by scheme and totalled across the programme.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 decreased from AMBER to RED. Delivery risk continued to rise. The closure of the Sustainable Farming Initiative (SFI) to new applicants disrupted delivery timelines. Defra were unable to re-plan with confidence until the funding…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":0,"attentionScore":38,"attentionReasons":["Current published delivery confidence is Red","In-year forecast variance is +9.4%"]},{"id":"DFE_0015_2021-Q3","year":2026,"name":"FE Capital Transformation","department":"DFE","category":"Infrastructure and Construction","description":"The FE Capital Transformation programme, first launched in 2020, was intended to upgrade and transform the further education college estate.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The delivery confidence is Amber and is moving towards Green. With the majority of projects completed or in contract, the risk of procurement pressures across the programme due to inflationary and market pressures has been reduced. This change in delivery confidence is driven by sustained progress in progressing projects into contract and to completion. Active engagement with FE colleges and key stakeholders remains critical to managing any affordability challenges in the projects that are not yet in contract. Looking ahead, progressing the small number of remaining projects into contract is the key priority. These tend to be the most multifaceted projects. Delivery confidence will become green when these schemes proceed into contract mitigating the risk of cost escalation.","startDate":"2020-04-01","endDate":"2029-09-30","scheduleNarrative":"The project's end-date at 25/26-Q4 has changed to 30/09/2029 reflecting the timelines of the small number of remaining multifaceted projects.","fyBaseline":483.95,"fyForecast":487.16,"fyVariance":0.66,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":2057.2,"costNarrative":"Whole Life Costs are based on the latest spending review which was agreed Spring 2025.","benefits":11323.84,"benefitsNarrative":"The key factors in monetising the benefits of the FE Capital Transformation Programme are the number of additional learners due to addressing poor condition estate, and the net present value of an FE aim started by the additional learners.","themes":["Commercial & supply chain","Delivery & schedule","Cost & funding","Approvals & decisions"],"evidenceExcerpt":"The delivery confidence is Amber and is moving towards Green. With the majority of projects completed or in contract, the risk of procurement pressures across the programme due to inflationary and market pressures has been reduced. This change in delivery confidence is driven by sustained progress in progressing projects into contract and to completion.…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"DFE_0015_2021-Q3","year":2021,"name":"FE Capital Transformation","department":"DFE","category":"Infrastructure and Construction","description":"The FE Capital Transformation programme will deliver the government's manifesto commitment to upgrade and transform the further education college estate. This will support the FE sector to deliver on its reform agenda and to support the levelling up of learner and labour market needs across the country with greater emphasis on technical education and vocational training.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber.This is primarily due to the following factors: The Delivery Confidence Assessment is rated Amber following an external assurance review by the IPA held in March 2021. The review confirmed that there has been considerable progress made to initiate the programme. All three phases of the programme delivery have launched to schedule. This capital programme delivery approach is new for the further education sector but builds upon the experience, knowledge and capability already established for the department's school rebuilding programme.","startDate":"2020-04-01","endDate":"2025-06-30","scheduleNarrative":"The project end-date is 30 June 2025. This is primarily due to the following factors: All three phases of the programme delivery have launched and are progressing to schedule. �200 million of grant allocations were issued to further education colleges in September 2020 to enable them to undertake immediate remedial work to refurbish their buildings. In January 2021, all further education colleges were invited to bid for additional funding to help upgrade their campuses and address condition need in their existing buildings. Bids are now being considered by the department with grant funding expected to be awarded in autumn 2021. In April 2021, the department announced it is working in partnership with the 16 further education colleges to deliver projects that will address some of the worst condition campuses across England.","fyBaseline":null,"fyForecast":null,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%. There is no budget variance to report in the early months of the 5-year programme","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"","themes":["Delivery & schedule","Cost & funding","Governance & assurance","Commercial & supply chain"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber.This is primarily due to the following factors: The Delivery Confidence Assessment is rated Amber following an external assurance review by the IPA held in March 2021. The review confirmed that there has been considerable progress made to initiate the programme. All three…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21"},{"id":"DFE_0015_2021-Q3","year":2022,"name":"FE Capital Transformation","department":"DFE","category":"Infrastructure and Construction","description":"The FE capital transformation will fund investment in FE colleges through: grants, 16 centrally delivered projects, and bidding rounds over five years. The programme will deliver on the government's manifesto commitment to upgrade and transform the FE college estate. This will support the FE sector to deliver on its reform agenda and to support the levelling up of learner and labour market needs across the country, with greater emphasis on technical education and vocational training.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 remained at Amber The Delivery Confidence Assessment is Amber as rated by the external assurance review in March 2021. All three phases of the programme delivery are launched and are being progressed in tandem. Phase 1 is complete. Phase 2 and Phase 3 are slightly delayed but are now progressing well. Announcements for Phase 3 are due early April. Delays will affect the profile of outturn spend; HMT has approved a revised annual spend profile through SR21. Work is well underway to develop the policy underpinning the next round of funding.?","startDate":"2020-04-01","endDate":"2025-06-30","scheduleNarrative":"Compared to 2021-Q4, your project end-date remained scheduled to finish on 30 JUN 2025 . This is primarily due to the following factors: All three phases of the programme delivery are launched and are being progressed in tandem. The first phase of the fund saw an initial £200 million allocated to all colleges so they could carry out urgent remedial work to refurbish their buildings. Following this, in April 2021 an announcement was made to work in partnership with sixteen colleges with some of the poorest condition sites in the country to upgrade their sites and ensure they are excellent places to learn. Construction is under way at one of these projects - Stafford College - and others will soon be ready to begin works. Through the 3rd Phase of the programme 62 FE colleges across the country are to benefit from building and campus upgrades and transformation, helping to level up opportunities for more people. 78 projects will be supported in total to allow colleges to create great buildings and facilities for high-quality training so more people progress into rewarding jobs, and plugging plug skills gaps in local economies.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"","themes":["Delivery & schedule","Commercial & supply chain","Cost & funding","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 remained at Amber The Delivery Confidence Assessment is Amber as rated by the external assurance review in March 2021. All three phases of the programme delivery are launched and are being progressed in tandem. Phase 1 is complete.…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"DFE_0015_2021-Q3","year":2023,"name":"FE Capital Transformation","department":"DFE","category":"Infrastructure and Construction","description":"The FE capital transformation will fund investment in FE colleges through: grants, 16 centrally delivered projects, and bidding rounds over five years. The programme will deliver on the government's manifesto commitment to upgrade and transform the FE college estate. This will support the FE sector to deliver on its reform agenda and to support the levelling up of learner and labour market needs across the country, with greater emphasis on technical education and vocational training.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. The Delivery Confidence Assessment is Amber as rated by the external assurance review in January 2023. All three phases of the programme delivery are launched and are being progressed in tandem. Phase 1 is complete. Phase 2 and Phase 3 round 1 are slightly delayed but are now progressing well. Phase 3 round 2 allocations were announced on 28 March and grants are due to be made in May. Delays will affect the profile of outturn spend; HMT approved a subsequent revised baseline spend profile in February 2023.","startDate":"2020-04-01","endDate":"2025-06-30","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2025-06-30. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2025-06-30. This is primarily due to the following factors. All three phases of the programme are launched and being progressed in tandem. The first phase of the fund saw an initial 200 million allocated to all colleges so they could carry out urgent remedial work to refurbish their buildings. Following this, in April 2021 an announcement was made to work in partnership with sixteen colleges with some of the poorest condition sites in the country to upgrade their sites and ensure they are excellent places to learn. Construction is nearly complete at Stafford College and other schemes will soon follow. Through Phase 3 60 FE colleges across the country are to benefit from building and campus upgrades and transformation, helping to level up opportunities for more people. Around 76 projects will be supported to allow colleges to create great buildings and facilities for high-quality training so more people progress into rewarding jobs, and plugging plug skills gaps in local economies. A final allocation of 286million will be made to colleges for them to continue to rebuild and upgrade their facilities.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","themes":["Delivery & schedule","Cost & funding","Commercial & supply chain","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. The Delivery Confidence Assessment is Amber as rated by the external assurance review in January 2023. All three phases of the programme delivery are launched and are…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"DFE_0015_2021-Q3","year":2024,"name":"FE Capital Transformation","department":"DFE","category":"Infrastructure and Construction","description":"The FE capital transformation fund was launched in 2020 to upgrade and transform college estates and create modern, fit-for-purpose spaces that meet the needs of students and communities they serve which was part of the government's manifesto commitment. Delivery was split into three phases: phase 1 gave grant allocations to all eligible FE colleges for urgent repairs and improvements; phase 2 is a DfE centrally delivered rebuilding programme to tackle 16 of the sites in worst condition; phase 3 uses grant funding to support colleges procuring rebuilding and improvement works on their existing estates. The scope of building works across the projects delivered varies greatly, some requiring full rebuilds and some smaller projects carrying out much needed refurbishments and renewal of life-expired building components. Some projects are integral to wider local regeneration initiatives.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The Delivery Confidence Assessment is Amber. Delivery is split into 3 phases, Phase 1 is complete and Phase 2 and 3 are progressing well albeit slightly delayed compared to original forecasts. Managing cost pressure is a key challenge across the programme due to inflationary and market pressures, however active engagement with key stakeholders is supporting the programme affordability challenges and enabling positive progress.","startDate":"2020-04-01","endDate":"2026-03-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 increased from 2025-06-30 to 2026-03-31. This is primarily due to the following factors. The programme comprises multiple rebuilding projects across college campus sites nationwide. We anticipate nearly all projects will be in construction by June 2025, with the new and improved facilities becoming operational by March 2027, to support the government's commitment to level up skills and training opportunities for people across the country.","fyBaseline":0.0,"fyForecast":0.0,"fyVariance":null,"varianceNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","themes":["Commercial & supply chain","Delivery & schedule","Cost & funding","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The Delivery Confidence Assessment is Amber. Delivery is split into 3 phases, Phase 1 is complete and Phase 2 and 3 are progressing well albeit slightly delayed…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"DFE_0015_2021-Q3","year":2025,"name":"FE Capital Transformation","department":"DfE","category":"Infrastructure and Construction","description":"The Further Education (FE) Capital Transformation programme will upgrade and transform the FE college estate. It will support the FE sector to deliver its reform agenda and to support the levelling-up of learner and labour market needs across the country, with greater emphasis on technical education and vocational training.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Section 43 - Commercial interests.","startDate":"2020-04-01","endDate":"2026-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2026. This is primarily due to the following factors‚ The programme comprises multiple rebuilding projects across college campus sites nationwide, with the majority complete by March 2026.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 43 - Commercial interests","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Section 43 - Commercial interests","themes":["Commercial & supply chain","Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Section 43 - Commercial interests. Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2026. This is primarily due to the…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"DFE_0015_2021-Q3","year":2026,"name":"FE Capital Transformation","department":"DFE","category":"Infrastructure and Construction","description":"The FE Capital Transformation programme, first launched in 2020, was intended to upgrade and transform the further education college estate.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The delivery confidence is Amber and is moving towards Green. With the majority of projects completed or in contract, the risk of procurement pressures across the programme due to inflationary and market pressures has been reduced. This change in delivery confidence is driven by sustained progress in progressing projects into contract and to completion. Active engagement with FE colleges and key stakeholders remains critical to managing any affordability challenges in the projects that are not yet in contract. Looking ahead, progressing the small number of remaining projects into contract is the key priority. These tend to be the most multifaceted projects. Delivery confidence will become green when these schemes proceed into contract mitigating the risk of cost escalation.","startDate":"2020-04-01","endDate":"2029-09-30","scheduleNarrative":"The project's end-date at 25/26-Q4 has changed to 30/09/2029 reflecting the timelines of the small number of remaining multifaceted projects.","fyBaseline":483.95,"fyForecast":487.16,"fyVariance":0.66,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":2057.2,"costNarrative":"Whole Life Costs are based on the latest spending review which was agreed Spring 2025.","benefits":11323.84,"benefitsNarrative":"The key factors in monetising the benefits of the FE Capital Transformation Programme are the number of additional learners due to addressing poor condition estate, and the net present value of an FE aim started by the additional learners.","themes":["Commercial & supply chain","Delivery & schedule","Cost & funding","Approvals & decisions"],"evidenceExcerpt":"The delivery confidence is Amber and is moving towards Green. With the majority of projects completed or in contract, the risk of procurement pressures across the programme due to inflationary and market pressures has been reduced. This change in delivery confidence is driven by sustained progress in progressing projects into contract and to completion.…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"DFE_0015_2021-Q3","year":2025,"name":"FE Capital Transformation","department":"DfE","category":"Infrastructure and Construction","description":"The Further Education (FE) Capital Transformation programme will upgrade and transform the FE college estate. It will support the FE sector to deliver its reform agenda and to support the levelling-up of learner and labour market needs across the country, with greater emphasis on technical education and vocational training.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Section 43 - Commercial interests.","startDate":"2020-04-01","endDate":"2026-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2026. This is primarily due to the following factors‚ The programme comprises multiple rebuilding projects across college campus sites nationwide, with the majority complete by March 2026.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 43 - Commercial interests","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Section 43 - Commercial interests","themes":["Commercial & supply chain","Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Section 43 - Commercial interests. Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2026. This is primarily due to the…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":1279,"attentionScore":38,"attentionReasons":["Current published delivery confidence is Amber","Published end date moved 1,279 days later"]},{"id":"MHCLG_0008_2122-Q1","year":2026,"name":"Freeports","department":"MHCLG","category":"Infrastructure and Construction","description":"The Freeports programme aims to catalyse private investment into the UK’s former industrial heartlands, helping transition regional economies towards the sectors of the future and create high-quality jobs for communities. All 12 Freeports are now “open for business”, offering a range of benefits to businesses looking to invest into the UK, including tax reliefs on specific sites, public seed investment (grants) to create investible propositions, and dedicated support for innovation and international trade.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. The rating recognises the Programme’s successful transition from set up into delivery. The most recent (April 2026) assurance review conducted by NISTA confirmed that the Programme has demonstrated substantial progress. All twelve Freeports across England, Scotland and Wales are now operational, with strong public accountable bodies and delivery bodies established, tax sites designated, and activity underway including early investment and business activity on the ground.","startDate":"2019-02-08","endDate":"2030-04-05","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 increased from 31/12/2027 to 05/04/2030 to reflect delivery across Scotland and Wales. England remains unaffected.","fyBaseline":69.77,"fyForecast":69.77,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":378.33,"costNarrative":"The WLC has increased by £66m, due to seed capital grants forecast for Scottish Green Freeports and Welsh Freeports for financial year 2025/26 which are now incorporated within the whole life costs and adjustments for inflation in real terms.. In addition, programme costs have profiled into future financial years until 2029/30 in line with the programme end date.","benefits":null,"benefitsNarrative":"The Freeports programme is expected to deliver a range of long-term benefits, including regeneration, improved skills and labour market outcomes, enhanced infrastructure and transport connectivity, and environmental improvements. Current monitoring appropriately focuses on the delivery of outputs, with established mechanisms in place to track progress against funded activity. While these outputs provide early evidence of delivery, they do not yet represent realised benefits. Formal evaluation of benefits has therefore not yet been undertaken, reflecting the time required for outcomes to materialise. An impact evaluation is planned for later in 2026, with a full evaluation to follow.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Commercial & supply chain"],"evidenceExcerpt":"The SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. The rating recognises the Programme’s successful transition from set up into delivery. The most recent (April 2026) assurance review conducted by NISTA confirmed that the Programme has demonstrated substantial progress. All twelve Freeports across England, Scotland and Wales…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"MHCLG_0008_2122-Q1","year":2022,"name":"Freeports","department":"DLUHC","category":"Infrastructure and Construction","description":"Freeports are a flagship government programme that will play an important part in the UK's post-Covid economic recovery and contribute to realising the Levelling Up agenda. Freeports will bring together ports, local authorities, businesses and other key local stakeholders to create national hubs for trade, innovation, commerce and global investment; regenerating communities across the UK, attracting new businesses, spreading jobs, investment and opportunity to towns and cities across the country. In March 2021, the Chancellor announced 8 successful prospective Freeports locations in England: East Midlands Airport, Felixstowe & Harwich, Humber, Liverpool City Region, Plymouth & South Devon, Solent, Teesside, and Thames. Subject to business case appraisal, they will be able to access a share of £200 millions of seed capital funding.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 2021/22-Q4 is Amber. We have achieved our goal of delivering at least one operational Freeport by November 2021, and a second became operational in December 2021. This is a complex programme working to challenging deadlines and requires stringent monitoring and collaboration from multiple Government departments. It is likely that Freeports will have staggered operationalisation between November 2021 and June 2022 with Full Business Cases being approved between May and August 2022. This is due to DLUHC making a swift start after the Chancellor's March 2021 statement regarding establishing Freeports. Eight candidates are progressing, working to accelerated delivery dates. The announcement of the first group to pass beyond the Outline Business Cases stage was announced in November but is one step on a complex journey with many political, policy and market-led challenges ahead.","startDate":"2019-02-08","endDate":"2027-12-31","scheduleNarrative":"Your programme end-date is 31 DEC 2027. This is primarily due to the following factors: The Freeports policy is complex and diverse with may technical aspects that need to be addressed prior to a site becoming operational. In March 2021, the Chancellor announced 8 successful prospective Freeports locations in England, as selected following the fair, open and assessment process outlined in the Bidding Prospectus. The 8 English Freeports are progressing through the appraisal stage and are due to move in to the delivery phase of the project during the summer of 2022.","fyBaseline":12.9,"fyForecast":5.1,"fyVariance":-60.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors: The initial profiles submitted at spending review where based on estimates. However the profile agreed at Spending Review (SR) was on the understanding that profiles would be revised once all Full Businesses Cases (FBCs) were appraised, in early 2022. SR profiles will be reviewed in light of revised profiles in FBCs.","wholeLifeCost":225.0,"costNarrative":"Your programme's Baseline Whole Life Cost is 224.80 (£m). This is primarily due to the following factors: This is the Capital and Revenue expenditure as agreed in the 2021 Spending Review. The exact profile of spend will be confirmed when Freeports submit their Full Business Cases.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 2021/22-Q4 is Amber. We have achieved our goal of delivering at least one operational Freeport by November 2021, and a second became operational in December 2021. This is a complex programme working to challenging deadlines and requires stringent monitoring and collaboration…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"MHCLG_0008_2122-Q1","year":2023,"name":"Freeports","department":"DLUHC","category":"Infrastructure and Construction","description":"In March 2021, the Chancellor announced 8 Freeport locations in England: East Midlands, Felixstowe & Harwich (Freeport East), Humber, Liverpool City Region, Plymouth & South Devon, Solent, Teesside and Thames. 7 of the 8 English Freeports have now received final government approvals and, subject to the delivery of agreed milestones, will receive a share of 200m over the coming years. This is in addition to a generous package of tax reliefs for businesses investing in Freeport areas, full local retention of business rates, and a range of support from government. Two Scottish Green Freeport locations were announced on 13/01/23 and two Welsh Freeport locations were announced on 22/03/23, following fair, open competitive processes as outlined in the bidding prospectuses. The Scottish and Welsh Freeports are now progressing through the business case process and are expected to move into the Delivery phase in summer 2024.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. This is a complex programme working to challenging deadlines and requires robust monitoring and collaboration from multiple government departments. Since then, the programme has made significant delivery progress, with7 out of 8 English Freeports now fully approved and up-and-running and the final one expected later in 2023. The responses to the previous Project Assessment Review were provided to the IPA ahead of a Stage Gate 0 assurance review in May 2023.","startDate":"2019-02-08","endDate":"2027-12-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2027-12-31. This is primarily due to the following factors. The Freeports policy is complex and diverse with many technical aspects that need to be addressed prior to a site becoming operational. The English Freeports are moving into the delivery phase with 7 out of the 8 full Business Cases approved. The remaining Full Business Case is expected to be approved later in 2023 when the customs site becomes operational. Two Scottish Green Freeport locations and two Welsh Freeport locations have been selected following fair, open competitive processes, as outlined in the bidding prospectuses. The Scottish and Welsh Freeports are now progressing through the business case process and are expected to move into the Delivery phase in summer 2024. The project end date of 31/12/2027 refers only to the seed funding component of the Freeports programme; other elements are subject to different timeframes.We remain committed to bringing the Freeports policy to Northern Ireland, and discussions continue.","fyBaseline":76.65,"fyForecast":42.65,"fyVariance":-44.0,"varianceNarrative":"The initial profiles submitted at spending review were based on estimates. These are being revised once all Freeport Full Business Cases are approved. 7 of the 8 English Freeports have now received final government approvals. The final Full Business Case is due to be approved in later in 2023 once the customs site designation is complete.The revised business cases meant some spending profiles have been moved further back into the next financial year.","wholeLifeCost":226.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 increased from 225m. to 226m. This is primarily due to the following factors. The capital expenditure was agreed in the Spending Review.It was agreed 25 million seed funding per Freeport, 200 million in total for English Freeports. In addition to monitoring and evaluation and technical support for Freeports.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. The project did not provide departmental-agree monetised benefits at 22/23-Q4. There are currently no monetised benefits for this programme. Benefits will be realised once the programme completes in 2026. The programme will measure success against the objectives of the programme, which can be summarised as; - To increase in trade throughout through the designated Freeport areas. - To increase in investment within Freeport boundary area, surrounding area and nationally. - To increased number of jobs and average wages in deprived areas in and around the Freeport. - To increase in economic specialisation in activities high in Growth Value Added relative to the current makeup of the local economy. - To Increased local involvement and funding in Research and Development and innovation. - To Increased productivity in each target region, through increased capacity to absorb innovation. As benefits are delivered throughout the end of the lifecycle of the project, they will be monitored through evaluation strategy.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. This is a complex programme working to challenging deadlines and requires robust monitoring and collaboration from multiple government departments. Since then, the…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"MHCLG_0008_2122-Q1","year":2024,"name":"Freeports","department":"DLUHC","category":"Infrastructure and Construction","description":"This programme supports economic growth through the creation of new Freeports across the UK.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. \"As at March 24: We continue to assess the delivery confidence of the programme as amber. _x000D_ _x000D_ The programme continues to focus on IPA recommendations to maximise the success of individual Freeports. \"","startDate":"2019-02-08","endDate":"2027-12-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2027-12-31. This is primarily due to the following factors. As at March 24: The project's end-date is December 2027.","fyBaseline":38.04,"fyForecast":38.04,"fyVariance":0.0,"varianceNarrative":"The budget variance is inferior or equal to 5%.","wholeLifeCost":229.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 increased from 226m. to 229m. This is primarily due to the following factors. Whole life costs have increased from 226m to 229m due to technical support required in the Devolved Administrations.","benefits":0.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 0m. Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 0m.","themes":["Cost & funding","Delivery & schedule","Technical & integration"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. \"As at March 24: We continue to assess the delivery confidence of the programme as amber. _x000D_ _x000D_ The programme continues to focus on IPA recommendations to…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"MHCLG_0008_2122-Q1","year":2025,"name":"Freeports","department":"MHCLG","category":"Infrastructure and Construction","description":"The Freeports programme aims to catalyse private investment into the UK’s former industrial heartlands, helping transition regional economies towards the sectors of the future, such as renewables, and create long-term, high-quality jobs for local communities. Freeports therefore have an important role to play in this government’s growth and clean energy missions, as set out in our recently published Industrial Strategy. Sites in all 12 Freeports have now been designated, meaning companies can benefit from a range of reliefs on new investment and job creation in Freeport areas. In addition, these locations will see an ambitious programme of public investment, including £300m capital funding and long-term local retention and reinvestment of business rates, as well as dedicated support for innovation and international trade. Freeports have already generated £6.4 billion in private investment, 89% of which is foreign direct investment. The capital funding element of the programme is forecast to complete by 2027/28; however tax reliefs and business rate retention will continue beyond this date.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The previous assurance review noted that the programme is rated as ‘Amber’ and on an upward trajectory from last year with much good progress demonstrated. It noted that the programme has successfully transitioned from a set-up phase into delivery and that governance structures have adapted to reflect the demands of delivery. Significant milestones have been achieved with all eight English Freeports having passed the business case approval stage and are moving into delivery on the ground with established tax sites and the beginnings of investment happening. The programme has made significant progress in addressing the recommendations from the previous assurance review including work to adapt the policy and formally re-engage departments in the programme. Further work is taking place to support the Scottish Green Freeports and Welsh Freeports to begin to move out of set-up into delivery.","startDate":"2019-02-08","endDate":"2027-12-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/12/2027. This is primarily due to the following factors‚ The project end date remains 31/12/2027.","fyBaseline":87.28,"fyForecast":87.28,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":256.3,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 229 to 256. This is primarily due to the following factors‚ Seed capital grants forecast for Scottish Green Freeports and Welsh Freeports for financial year 2025/26 which were not previously captured; in addition, programme costs have profiled into financial year 2025/26 in line with the programme end date.","benefits":null,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ The Freeports programme will provide a range of benefits through the delivery of regeneration, skills and labour market, infrastructure and transport, and environmental benefits.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The previous assurance review noted that the programme is rated as ‘Amber’ and on an upward trajectory from last year with much good progress demonstrated. It noted…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"MHCLG_0008_2122-Q1","year":2026,"name":"Freeports","department":"MHCLG","category":"Infrastructure and Construction","description":"The Freeports programme aims to catalyse private investment into the UK’s former industrial heartlands, helping transition regional economies towards the sectors of the future and create high-quality jobs for communities. All 12 Freeports are now “open for business”, offering a range of benefits to businesses looking to invest into the UK, including tax reliefs on specific sites, public seed investment (grants) to create investible propositions, and dedicated support for innovation and international trade.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. The rating recognises the Programme’s successful transition from set up into delivery. The most recent (April 2026) assurance review conducted by NISTA confirmed that the Programme has demonstrated substantial progress. All twelve Freeports across England, Scotland and Wales are now operational, with strong public accountable bodies and delivery bodies established, tax sites designated, and activity underway including early investment and business activity on the ground.","startDate":"2019-02-08","endDate":"2030-04-05","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 increased from 31/12/2027 to 05/04/2030 to reflect delivery across Scotland and Wales. England remains unaffected.","fyBaseline":69.77,"fyForecast":69.77,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":378.33,"costNarrative":"The WLC has increased by £66m, due to seed capital grants forecast for Scottish Green Freeports and Welsh Freeports for financial year 2025/26 which are now incorporated within the whole life costs and adjustments for inflation in real terms.. In addition, programme costs have profiled into future financial years until 2029/30 in line with the programme end date.","benefits":null,"benefitsNarrative":"The Freeports programme is expected to deliver a range of long-term benefits, including regeneration, improved skills and labour market outcomes, enhanced infrastructure and transport connectivity, and environmental improvements. Current monitoring appropriately focuses on the delivery of outputs, with established mechanisms in place to track progress against funded activity. While these outputs provide early evidence of delivery, they do not yet represent realised benefits. Formal evaluation of benefits has therefore not yet been undertaken, reflecting the time required for outcomes to materialise. An impact evaluation is planned for later in 2026, with a full evaluation to follow.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Commercial & supply chain"],"evidenceExcerpt":"The SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. The rating recognises the Programme’s successful transition from set up into delivery. The most recent (April 2026) assurance review conducted by NISTA confirmed that the Programme has demonstrated substantial progress. All twelve Freeports across England, Scotland and Wales…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"MHCLG_0008_2122-Q1","year":2025,"name":"Freeports","department":"MHCLG","category":"Infrastructure and Construction","description":"The Freeports programme aims to catalyse private investment into the UK’s former industrial heartlands, helping transition regional economies towards the sectors of the future, such as renewables, and create long-term, high-quality jobs for local communities. Freeports therefore have an important role to play in this government’s growth and clean energy missions, as set out in our recently published Industrial Strategy. Sites in all 12 Freeports have now been designated, meaning companies can benefit from a range of reliefs on new investment and job creation in Freeport areas. In addition, these locations will see an ambitious programme of public investment, including £300m capital funding and long-term local retention and reinvestment of business rates, as well as dedicated support for innovation and international trade. Freeports have already generated £6.4 billion in private investment, 89% of which is foreign direct investment. The capital funding element of the programme is forecast to complete by 2027/28; however tax reliefs and business rate retention will continue beyond this date.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The previous assurance review noted that the programme is rated as ‘Amber’ and on an upward trajectory from last year with much good progress demonstrated. It noted that the programme has successfully transitioned from a set-up phase into delivery and that governance structures have adapted to reflect the demands of delivery. Significant milestones have been achieved with all eight English Freeports having passed the business case approval stage and are moving into delivery on the ground with established tax sites and the beginnings of investment happening. The programme has made significant progress in addressing the recommendations from the previous assurance review including work to adapt the policy and formally re-engage departments in the programme. Further work is taking place to support the Scottish Green Freeports and Welsh Freeports to begin to move out of set-up into delivery.","startDate":"2019-02-08","endDate":"2027-12-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/12/2027. This is primarily due to the following factors‚ The project end date remains 31/12/2027.","fyBaseline":87.28,"fyForecast":87.28,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":256.3,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 229 to 256. This is primarily due to the following factors‚ Seed capital grants forecast for Scottish Green Freeports and Welsh Freeports for financial year 2025/26 which were not previously captured; in addition, programme costs have profiled into financial year 2025/26 in line with the programme end date.","benefits":null,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ The Freeports programme will provide a range of benefits through the delivery of regeneration, skills and labour market, infrastructure and transport, and environmental benefits.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The previous assurance review noted that the programme is rated as ‘Amber’ and on an upward trajectory from last year with much good progress demonstrated. It noted…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":826,"attentionScore":38,"attentionReasons":["Current published delivery confidence is Amber","Published end date moved 826 days later"]},{"id":"DFT_0022_1415-Q4","year":2026,"name":"LOWER THAMES CROSSING","department":"DFT","category":"Infrastructure and Construction","description":"The Lower Thames Crossing (LTC) is a proposed new road connecting Kent, Thurrock and Essex through twin-bored tunnels under the River Thames. It will almost double the road capacity across the River Thames east of London and is the largest single road investment project in the UK since the M25 was completed more than 30 years ago. As a vital part of the UK’s transport infrastructure, it will act as a catalyst for national and local economic growth. Building a reliable, modern new road that is fit for the future will help connect the nation's busiest ports to the distribution hubs in the North, Midlands and beyond. It will improve network resilience and the performance of the existing crossings at Dartford, transforming the regional and national road network. The LTC will open up new markets for businesses and create tens of thousands of new jobs and hundreds of apprenticeships during its construction. At Autumn Budget 2025 it was confirmed that the Government's preferred financing option at this stage of the project is the Regulated Asset Base (RAB) model which will allow for a regulated private entity to finance, build, operate, and maintain the asset under long-term oversight by an independent regulator. Under the RAB model, operations of the Dartford Crossing would transfer to a new regulated private sector entity, which would be responsible for operating and maintaining both the Dartford Crossing and the new LTC. The project therefore now incorporates the work required to create the legislative, regulatory and commercial framework for the RAB model.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 improved from Amber to Green. This is primarily due to the following factors‚ The LTC project secured additional public funding with £1.66bn in the Third Road Investment Strategy for the years 2026/27 and 2028/29 which includes the £891m announced at Autumn Budget 2025 and funding previously committed for those years. The Government also confirmed in 25/26 that the preferred finance model at this stage of the project is the Regulated Asset Base (RAB) model. This strengthens confidence in delivery and steps are being taken to prepare for a transaction with the private sector. The NISTA DCA rating for 25/26 Q4 is Amber, whilst we recognise that there are still risks to delivery, the SRO is content that sufficient mitigations were in place as of March-26 and therefore rated the DCA as Green. The project DCA is reviewed monthly. The Outline Business Case was updated and approved by the DfT Investment Committee in October 2025. This marks the transition from full public sector funding to a future private sector RAB model, with the private sector to deliver the remainder of the scheme and take on Dartford Crossing operations in 2028. The DfT team working on the project has expanded to reflect the new work required on legislation and regulation, and the SRO role during 25/26 moved from National Highways to DfT to reflect this broader scope.","startDate":"2014-05-30","endDate":"2035-07-31","scheduleNarrative":"The project was granted Development Consent on 25 March 2025. The project was re-baselined in October 2025 to inform Autumn Budget 2025 decision making where the Regulated Asset Base (RAB) model was selected as the preferred financing model. An Accounting Officer Assessment was undertaken to support this decision. The project remains on course to deliver as set out at Autumn Budget. We expect the existing Dartford Crossing and LTC project to move from public to private ownership in 2028. The main tunnelling phase for the LTC is expected to begin in 2028 and the target date for the road to be open for traffic is the early to mid-2030’s .","fyBaseline":338.05,"fyForecast":338.05,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":9899.54,"costNarrative":"Compared to financial year 24/25-Q4, the projects departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) increased from £8950,220m to £10629,020m. This is primarily due to schedule delay, the first delay was due to affordability and planning consent delays as set out in the Written Ministerial Statement issued 9 March 2023 which re-phased construction by 2 Years. A further delay to the DCO decision was announced by the Secretary of State in October 2024 extended the decision deadline to May 2025. The cost increase incorporates the prolongation and inflationary impacts following these two schedule delays which required the project to re-baseline. It should be noted that it is the intention to split the Whole Life Cost between both Public and Private finance under the Regulated Asset Base model. The transition to private finance is currently expected to occur in 2028. To note: the figures in the Annual Assessment may differ to those in this narrative due to NISTA deflating costs forecast for later years.","benefits":1816.27,"benefitsNarrative":"The current approved benefits at 25/26-Q4 remained at £3,009m. This figure is based on the project being fully publicly funded and is now outdated due to the approval to move to a Regulated Asset Base (RAB) model. The VfM analysis will continue to develop as detail on policy assumptions evolves, alongside any updates to our appraisal approach. For example, the department has made the decision to take forward LTC on the basis of the Regulated Asset Base model (RAB) and has published its intention to adopt new, higher values of time for freight movements. The strategic case for the LTC project remains strong. As well as the connectivity and congestion relieving benefits delivered by the new crossing, which leads to major economic benefits, this is also based around the escalating need for maintenance of the Dartford Crossing. The Dartford Crossing is already operating significantly over capacity and suffers from poor reliability. As with any major project, there are significant risks to be managed in order to realise the project’s benefits. We will continue to work with NISTA and apply lessons from the James Stewart review of High Speed 2 to help minimise those risks. Further work will be completed in the next stages of the programme up to FBC at which point the accounting officer assessment will be refreshed. As the benefits are expected to be felt for several decades, the figures in the Annual Assessment may differ to those in this narrative due to NISTA deflating benefits post 2050.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 improved from Amber to Green. This is primarily due to the following factors‚ The LTC project secured additional public funding with £1.66bn in the Third Road Investment Strategy for the years 2026/27 and 2028/29 which includes the £891m announced at Autumn…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"DFT_0022_1415-Q4","year":2020,"name":"Lower Thames Crossing","department":"DFT","category":"Infrastructure and Construction","description":"A new free-flowing road crossing of the Lower Thames east of Gravesend and Tilbury. It will improve network resilience and the performance of the existing crossings at Dartford enabling local regional and national economic growth.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber, which has not changed since last year�s Q2 1819 Amber, due primarily to the following factors; - The project schedule is extremely tight with multiple critical paths and constrained timescales to support a 2027 Open for Traffic (OfT) date. Further work is needed to validate elements of the schedule, particularly how schedule risk and opportunity is handled, and to ensure it is robust. - Further market engagement is required to validate some of the assumptions in the Commercial case, including the proposed commercial model. This engagement needs to target non-UK suppliers, verify the construction programme and validate the contracting strategy and procurement process - The concurrency of key dates for the procurement and DCO schedule are sensitive to one another. There is a risk around completing dialogue before close of DCO examination which is being considered as part of a review of the schedule Since the Q2 1920 (30th September 2019) Amber IPA DCA, the following non-project operating environment activities have impacted the original Q2 IPA DCA; - In March 2020 the Chancellor, as part of the Budget settlement, announced that the project would be fully publicly funded. It was previously announced in October 2018 that private funding would not be used to partly fund the project. Since the Q2 1920 (30th September 2019) Amber IPA DCA, the following primary project actions have impacted the original Q2 IPA DCA; - A baseline (cost, schedule & risk) review of the project was undertaken in late 2019, which was approved by DfT in December 2019. - Further ground investigation have been undertaken to feed into the development of the projects schedule and cost assumptions","startDate":"2014-05-30","endDate":"2028-07-31","scheduleNarrative":"The scheduled baseline project end date at Q2 1920 (30th September 2019) is 31/07/28, has not changed since last year's Q2 1819 date of 31/07/28, due primarily to the following factors; - Certainty of RIS 2 funding and confirmation of funding to replace that which was to be privately financed - Following the removal of the constraints imposed by being partly privately funded (including contract packaging) the project has updated, strengthened and externally assured our Commercial Procurement Strategy which de-risks the schedule. - The outcome of market engagement which will confirm if our assumptions regarding timescales and cost are realistic for the tunnelling work Since the Q2 1920 (30th September 2019) baseline project end date of 31/07/28, the following non-project operating environment activities have impacted the original Q2 baseline project end date; - The corona virus pandemic is impacting on project delivery. We have implemented business continuity plans and our IT platforms allow office staff to effectively work at home. However Covid-19 prevention measures are impacting on ground investigation and other early works. There are also indirect consequences on the schedule as a result of the effect on the construction market which are likely to affect the procurement process. - The project have introduced a baseline schedule range of December 2027 to November 2028. The likely project end date is 7 months after this to accommodate project close down activities. Since the Q2 1920 (30th September 2019) baseline project end date of 31/07/28, the following primary project actions have impacted the original Q2 baseline project end date; - A full review of the schedule is underway to validate the likely project timeline given a number of factors including the impact of Covid 19. The outcome of this work is expected in summer 2020. - As part of the review of the schedule we are considering the timing of the main works procurements as compared to the DCO examination and award dates. This is to derisk the procurement activity by providing sufficient certainty to bidders","fyBaseline":165.0,"fyForecast":165.0,"fyVariance":0.0,"varianceNarrative":"Budget variance less than 5%","wholeLifeCost":6052.2,"costNarrative":"The baseline Whole Life Cost at Q2 1920 (30th September 2019) is �6,052.20 m, has increased on last year's Q2 1819 (�m) baseline Whole Life Cost, due primarily to the following factors; - The increase is due to the addition of portfolio risk to the previously approved cost (in line with HE policy) and an increase in non-recoverable VAT following the move from private to public finance for the link roads. Since Q2 1920 DfT has approved a further update to the Whole Life Cost and the latest approved position is �6,391m. Since the Q2 1920 (30th September 2019) �6,052.20 m baseline Whole Life Cost, the following non-project operating environment activities have impacted the original baseline Q2 Whole Life Cost; - The delays caused by Covid19 will impact inflation Since the Q2 1920 (30th September 2019) �6,052.20 m baseline Whole Life Cost, the following primary project actions have impacted the original Q2 baseline Whole Life Cost; - In line with Highways England Policy, portfolio risk has been added. This along with design changes (Removal of Tilbury Junction including Rest and Service Area including associated viaduct works) were submitted for approval to DfT in December 2019. - Since December 2019, we have made further design changes for safety and following consultation feedback. We have also updated the schedule to incorporate feedback from a number of independent reviews. These changes may increase the inflation included in the whole life cost.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Governance & assurance"],"evidenceExcerpt":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber, which has not changed since last year�s Q2 1819 Amber, due primarily to the following factors; - The project schedule is extremely tight with multiple critical paths and constrained timescales to support a 2027 Open for Traffic (OfT) date. Further work is needed…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2020","sourceLabel":"IPA Annual Report 2019-20"},{"id":"DFT_0022_1415-Q4","year":2021,"name":"Lower Thames Crossing","department":"DFT","category":"Infrastructure and Construction","description":"The Lower Thames Crossing (LTC) is a proposed new expressway connecting Kent, Thurrock and Essex through twin bored tunnels under the Thames. It will almost double the road capacity across the River Thames east of London and is the largest single road investment project in the UK since the M25 was completed more than 30 years ago. As a vital part of the UK's transport infrastructure, it will act as a catalyst for national and local economic growth. Building a reliable, modern new road that is fit for the future will help connect the nation's busiest ports to the distribution hubs in the North, Midlands and beyond. It will improve network resilience and the performance of the existing crossings at Dartford, transforming the regional and national road network. LTC will open up new markets for businesses and create tens of thousands of new jobs and hundreds of apprenticeships during its construction.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber. This is primarily due to the following factors: Lower Thames Crossing (LTC) continues to progress well on several fronts. The three tenderers for the Tunnels contract have been announced and contract notices issued for the two Roads contracts. The programme has successfully transitioned to a separate Highways England Directorate, with its Executive Director reporting directly to the Chief Executive. A strengthened Client Team has been established with all senior roles in place. An Integration Partner to support the Programme has been appointed and is currently mobilising. Following advice from the Planning Inspectorate (PINS), the Development Consent Order (DCO) application was withdrawn. There has been significant engagement with key stakeholders including affected local authorities. A further Public Consultation will commence in Summer with DCO resubmission in late 2021. The cost and schedule impact of the withdrawal will be finalised during the summer. Following an Assurance Action Plan Review the IPA improved its DCA to Amber, which, while reflecting the programme's progress, notes the current DCO position.","startDate":"2014-05-30","endDate":"2029-05-31","scheduleNarrative":"Compared to financial year 19/20-Q2, the project's end-date increased from 31 July 2028 to 31 May 2029 . This is primarily due to the following factors: A rebaseline exercise was undertaken which was fully externally assured. The project was requested by the Major Projects Review Group (MPRG) and DfT to rebaseline without the constraint of a defined completion date. This aligns with the 'Lessons from transport for the sponsorship of major projects' (2019) which recommends that an evidenced range should be used rather than a single target date. The cost and schedule impact of the withdrawal will be finalised during the summer.","fyBaseline":245.0,"fyForecast":246.3,"fyVariance":1.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":6391.04,"costNarrative":"Compared to financial year 19/20-Q2, the projects Baseline Whole Life Cost increased from �5692.07m to �6391.04m. This is primarily due to the following factors: The baseline cost increase reflects the maturing and further development of both the design and the associated costs partly driven by the results of ground investigation. These changes include the need to further mitigate the adverse environmental impacts, most noticeably moving the southern portal to negate risk to the internationally protected wetland south of the River Thames and an increased land requirement. There was also a re-evaluation of the costs of moving nationally significant infrastructure including high pressure gas mains, high voltage power lines and global banking data lines. A number of independent reviews were undertaken to assure the updated baseline cost.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Scope & requirements","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber. This is primarily due to the following factors: Lower Thames Crossing (LTC) continues to progress well on several fronts. The three tenderers for the Tunnels contract have been announced and contract notices issued for the two…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21"},{"id":"DFT_0022_1415-Q4","year":2022,"name":"Lower Thames Crossing","department":"DFT","category":"Infrastructure and Construction","description":"The Lower Thames Crossing (LTC) is a proposed new expressway connecting Kent, Thurrock and Essex through twin-bored tunnels under the Thames. It will almost double the road capacity across the River Thames east of London and is the largest single road investment project in the UK since the M25 was completed more than 30 years ago. As a vital part of the UK's transport infrastructure, it will act as a catalyst for national and local economic growth. Building a reliable, modern new road that is fit for the future will help connect the nation's busiest ports to the distribution hubs in the North, Midlands and beyond. it will improve network resilience and the performance of the existing crossings at Dartford, transforming the regional and national road network. LTC will open up new markets for businesses and create tens of thousands of new jobs and hundreds of apprenticeships during its construction.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 remained at Amber Compared to financial year 20/21-Q4, the project's rating remained at Amber. This is primarily due to the following factors: this reflects the continued focus from National Highways on submission of the Development Consent Order (DCO) for Lower Thames Crossing (LTC) and working with stakeholders to both promote the scheme and mitigate any risks & impacts. National Highways announced earlier this year that the LTC would be a pathfinder project towards carbon neutral construction. National Highways adjusted its scope for the LTC to allow the full opportunity that the Thames Freeport enables, working closely with the Port of Tilbury. National Highways aims to submit the DCO for the LTC later this year. Alongside the focus on the DCO, National Highways is continuing to progress the procurement programme to minimise the impact of recent delays, maintaining market engagement and enabling greater co-ordination across the three Main Works Contracts to maximise the social and environmental outcomes.","startDate":"2014-05-30","endDate":"2029-05-31","scheduleNarrative":"Compared to 2021-Q4, your project end-date remained scheduled to finish on 31 MAY 2029 . This is primarily due to the following factors: This reflects the continued focus from National Highways on DCO re-submission and the National Highways Community Impacts Consultation in July 2021 where National Highways adjusted its scope for LTC to allow the full opportunity that the Thames Freeport enables to be realised, working closely with the Port of Tilbury and Thurrock Council. This requires a further round of public consultation on the LTC from 12 May - 20 June and National Highways plans to submit the application for a DCO later this year.","fyBaseline":295.0,"fyForecast":150.7,"fyVariance":-49.0,"varianceNarrative":"The budget variance is less than 5% due to the in-year spend being £144.3m less than baseline. Planned works have been deferred to reduce committed spend reducing overall outturn following the delayed DCO submission.","wholeLifeCost":6752.0,"costNarrative":"Compared to2021-Q4, the projects Baseline Whole Life Cost increased from 6391.04 (£m) to 6752.00 (£m). This is primarily due to the following factors: The inflationary impacts of the construction works were delayed following the withdrawal of the Development Consent Order for the LTC. Whilst the baseline is the latest assured position, a new programme estimate is currently being undertaken and due for completion in Q2. This will include some additional costs to the baseline which take into account the impact of accommodating the Thames Freeport and subsequent inflationary impacts. National Highways expect the underlying base costs to not have materially changed. A number of independent reviews are being undertaken to assure the updated baseline cost.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 remained at Amber Compared to financial year 20/21-Q4, the project's rating remained at Amber. This is primarily due to the following factors: this reflects the continued focus from National Highways on submission of the Development…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"DFT_0022_1415-Q4","year":2023,"name":"Lower Thames Crossing","department":"DFT","category":"Infrastructure and Construction","description":"The Lower Thames Crossing (LTC) is a proposed new expressway connecting Kent, Thurrock and Essex through twin-bored tunnels under the Thames. It will almost double the road capacity across the River Thames east of London and is the largest single road investment project in the UK since the M25 was completed more than 30 years ago. As a vital part of the UKs transport infrastructure, it will act as a catalyst for national and local economic growth. Building a reliable, modern new road that is fit for the future will help connect the nations busiest ports to the distribution hubs in the North, Midlands and beyond. It will improve network resilience and the performance of the existing crossings at Dartford, transforming the regional and national road network. LTC will open up new markets for businesses and create tens of thousands of new jobs and hundreds of apprenticeships during its construction.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. The key strategic risks remain mainly around the consenting process and loss of momentum. The current risk profile of the programme is being reviewed to understand the implications of the Ministerial Statement issued on the 9 March 2023 confirming government commitment to the Programme and that construction would be rephased by two years, against the current approved baseline given the wider fiscal pressures on capital investment from inflation.Compared to financial year 21/22-Q4, the programmes DCA remains at Amber due to the Ministerial Statement, pressures on capital investment from inflation, and the Development Consent Order","startDate":"2014-05-30","endDate":"2032-03-10","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 increased from 2029-05-31 to 2032-03-10. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 increased from 2029-05-31 to 2032-03-10. This is primarily due to the following factors. The date is within the original range we expected. The written ministerial statement has increased the range to the upper end which has been included in the forecast. The Ministerial Statement issued on the 9 March 2023 confirmed government commitment to the Programme and that construction would be rephased by two years, against the current approved baseline given the wider fiscal pressures on capital investment from inflation. The project will continue to work through what the announcement means for the schedule and the project end date.","fyBaseline":129.3,"fyForecast":169.3,"fyVariance":31.0,"varianceNarrative":"The budget variance is due to advancing the acquisition of Southern Valley Golf Course, Port of Tilbury Land and Pilgrims Lane lease.","wholeLifeCost":8309.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 increased from 6752m. to 8309m. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 increased from 6752m. to 8309m. This is primarily due to the following factors. The cost increases are primarily linked to the Freeport changes, DCO delay, inflation and prolongation costs. This figure is is the Most Likely capex cost in outturn prices.","benefits":4313.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 4313m. Work is ongoing to update the benefits following submission of the DCO to inform Government's final investment decision and following the Written Ministerial Statement on 9 March 2023, which confirmed that the construction of LTC would be re-phased by two years due to wider pressure on the RIS, driven by high inflation. Benefits are expressed in 2010 prices and values.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. The key strategic risks remain mainly around the consenting process and loss of momentum. The current risk profile of the programme is being reviewed to understand…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"DFT_0022_1415-Q4","year":2024,"name":"Lower Thames Crossing","department":"DFT","category":"Infrastructure and Construction","description":"The Lower Thames Crossing (LTC) is a proposed new expressway connecting Kent, Thurrock and Essex through twin-bored tunnels under the Thames. It will almost double the road capacity across the River Thames east of London and is the largest single road investment project in the UK since the M25 was completed more than 30 years ago. As a vital part of the UKs transport infrastructure, it will act as a catalyst for national and local economic growth. Building a reliable, modern new road that is fit for the future will help connect the nation's busiest ports to the distribution hubs in the North, Midlands and beyond. It will improve network resilience and the performance of the existing crossings at Dartford, transforming the regional and national road network. LTC will open up new markets for businesses and create tens of thousands of new jobs and hundreds of apprenticeships during its construction.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The key strategic risks remain mainly the consenting process and loss of momentum. The project will be updating its overall cost and schedule in line with the Written Ministerial Statement as the project manages the Written Ministerial Statement, plus the pressures on capital investment from inflation, the continuing Development Consent Order process, and the complexity of the activity needed to enable a funding investment decision.","startDate":"2014-05-30","endDate":"2034-04-20","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 increased from 2032-03-10 to 2034-04-20. This is primarily due to the following factors. The Written Ministerial Statement issued on the 9 March 2023 confirmed government commitment to the Programme and that construction would be rephased by two years, against the current approved baseline. This was to allow more time to take into account stakeholder views and prepare an effective and deliverable plan, while helping to meet wider inflationary pressures. The project has now re-baselined to reflect the March 2023 Written Ministerial Statement.","fyBaseline":148.0,"fyForecast":148.0,"fyVariance":0.0,"varianceNarrative":"The budget variance is inferior or equal to 5%.","wholeLifeCost":8950.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 increased from 8309m. to 8950m. This is primarily due to the following factors. This is primarily due to the following factors, inflation, and prolongation costs. This figure is the Most Likely capex cost in outturn prices.","benefits":3009.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 2324-Q4 decreased from 4313m. to 3009m. The project's departmental-agree monetised benefits at 23/24-Q4 is 3009m._x000D_ The programme has produced an early draft of the Full Business Case (FBC) Strategic, Economic, Commercial and Management Dimensions. _x000D_ The economic analysis has been updated for revised Transport Analysis Guidance (TAG) guidelines, carbon costs/benefits and strategic benefits. Additional analysis on freight valuations and sensitivity tests has been undertaken. The analysis has used the existing approved cost profile of 8095m.","themes":["Cost & funding","Approvals & decisions","Commercial & supply chain","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The key strategic risks remain mainly the consenting process and loss of momentum. The project will be updating its overall cost and schedule in line with the Written…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"DFT_0022_1415-Q4","year":2025,"name":"LOWER THAMES CROSSING","department":"DfT","category":"Infrastructure and Construction","description":"The Lower Thames Crossing (LTC) is a proposed new expressway connecting Kent, Thurrock and Essex through twin-bored tunnels under the Thames. It will almost double the road capacity across the River Thames east of London and is the largest single road investment project in the UK since the M25 was completed more than 30 years ago. As a vital part of the UKs transport infrastructure, it will act as a catalyst for national and local economic growth. Building a reliable, modern new road that is fit for the future will help connect the nation's busiest ports to the distribution hubs in the North, Midlands and beyond. It will improve network resilience and the performance of the existing crossings at Dartford, transforming the regional and national road network. LTC will open up new markets for businesses and create tens of thousands of new jobs and hundreds of apprenticeships during its construction.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The DCO decision date was the subject of a Written Ministerial Statement and was extended from the 4 October 2024 until 23 May 2025, with consent granted on 25 March 2025. The key strategic risks remain mainly on the complexity of the activity needed to take the Project through to future funding decisions.","startDate":"2014-05-30","endDate":"2034-04-20","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 20/04/2034. This is primarily due to the following factors‚ The project was subject to a Written Ministerial Statement on the 9 March 2023 re-phasing construction by 2 Years. The programme was re-baselined to reflect the March 2023 Written Ministerial Statement. This had a direct impact on the Open for Traffic date. This baseline is no longer viable after a second Written Ministerial Statement was issued on the 4 October 2024 extending the Development Consent Order Decision date until 23 May 2025 in order to allow more time for the application to be considered further, including as part of the spending review [Development Consent Order Consent granted 25 March 2025]. The project is currently working on the impact to the Open for Traffic following the second Written Ministerial Statement.","fyBaseline":203.0,"fyForecast":203.0,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":8950.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 8950. This is primarily due to the following factors‚ The project's departmentally agreed Whole Life Cost at 24/25-Q4 is 8950m. The project is currently forecasting within the approved budget. The spending review 2025 and the formal decision on the preferred funding option could impact the whole life costs of the project.","benefits":3009.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 3009. This is primarily due to the following factors‚ The departmentally agreed Benefits at 24/25-Q4 remained at 3009m. Formal decision on the preferred funding option could impact the benefits.","themes":["Cost & funding","Approvals & decisions","Governance & assurance","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The DCO decision date was the subject of a Written Ministerial Statement and was extended from the 4 October 2024 until 23 May 2025, with consent granted on 25 March…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"DFT_0022_1415-Q4","year":2026,"name":"LOWER THAMES CROSSING","department":"DFT","category":"Infrastructure and Construction","description":"The Lower Thames Crossing (LTC) is a proposed new road connecting Kent, Thurrock and Essex through twin-bored tunnels under the River Thames. It will almost double the road capacity across the River Thames east of London and is the largest single road investment project in the UK since the M25 was completed more than 30 years ago. As a vital part of the UK’s transport infrastructure, it will act as a catalyst for national and local economic growth. Building a reliable, modern new road that is fit for the future will help connect the nation's busiest ports to the distribution hubs in the North, Midlands and beyond. It will improve network resilience and the performance of the existing crossings at Dartford, transforming the regional and national road network. The LTC will open up new markets for businesses and create tens of thousands of new jobs and hundreds of apprenticeships during its construction. At Autumn Budget 2025 it was confirmed that the Government's preferred financing option at this stage of the project is the Regulated Asset Base (RAB) model which will allow for a regulated private entity to finance, build, operate, and maintain the asset under long-term oversight by an independent regulator. Under the RAB model, operations of the Dartford Crossing would transfer to a new regulated private sector entity, which would be responsible for operating and maintaining both the Dartford Crossing and the new LTC. The project therefore now incorporates the work required to create the legislative, regulatory and commercial framework for the RAB model.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 improved from Amber to Green. This is primarily due to the following factors‚ The LTC project secured additional public funding with £1.66bn in the Third Road Investment Strategy for the years 2026/27 and 2028/29 which includes the £891m announced at Autumn Budget 2025 and funding previously committed for those years. The Government also confirmed in 25/26 that the preferred finance model at this stage of the project is the Regulated Asset Base (RAB) model. This strengthens confidence in delivery and steps are being taken to prepare for a transaction with the private sector. The NISTA DCA rating for 25/26 Q4 is Amber, whilst we recognise that there are still risks to delivery, the SRO is content that sufficient mitigations were in place as of March-26 and therefore rated the DCA as Green. The project DCA is reviewed monthly. The Outline Business Case was updated and approved by the DfT Investment Committee in October 2025. This marks the transition from full public sector funding to a future private sector RAB model, with the private sector to deliver the remainder of the scheme and take on Dartford Crossing operations in 2028. The DfT team working on the project has expanded to reflect the new work required on legislation and regulation, and the SRO role during 25/26 moved from National Highways to DfT to reflect this broader scope.","startDate":"2014-05-30","endDate":"2035-07-31","scheduleNarrative":"The project was granted Development Consent on 25 March 2025. The project was re-baselined in October 2025 to inform Autumn Budget 2025 decision making where the Regulated Asset Base (RAB) model was selected as the preferred financing model. An Accounting Officer Assessment was undertaken to support this decision. The project remains on course to deliver as set out at Autumn Budget. We expect the existing Dartford Crossing and LTC project to move from public to private ownership in 2028. The main tunnelling phase for the LTC is expected to begin in 2028 and the target date for the road to be open for traffic is the early to mid-2030’s .","fyBaseline":338.05,"fyForecast":338.05,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":9899.54,"costNarrative":"Compared to financial year 24/25-Q4, the projects departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) increased from £8950,220m to £10629,020m. This is primarily due to schedule delay, the first delay was due to affordability and planning consent delays as set out in the Written Ministerial Statement issued 9 March 2023 which re-phased construction by 2 Years. A further delay to the DCO decision was announced by the Secretary of State in October 2024 extended the decision deadline to May 2025. The cost increase incorporates the prolongation and inflationary impacts following these two schedule delays which required the project to re-baseline. It should be noted that it is the intention to split the Whole Life Cost between both Public and Private finance under the Regulated Asset Base model. The transition to private finance is currently expected to occur in 2028. To note: the figures in the Annual Assessment may differ to those in this narrative due to NISTA deflating costs forecast for later years.","benefits":1816.27,"benefitsNarrative":"The current approved benefits at 25/26-Q4 remained at £3,009m. This figure is based on the project being fully publicly funded and is now outdated due to the approval to move to a Regulated Asset Base (RAB) model. The VfM analysis will continue to develop as detail on policy assumptions evolves, alongside any updates to our appraisal approach. For example, the department has made the decision to take forward LTC on the basis of the Regulated Asset Base model (RAB) and has published its intention to adopt new, higher values of time for freight movements. The strategic case for the LTC project remains strong. As well as the connectivity and congestion relieving benefits delivered by the new crossing, which leads to major economic benefits, this is also based around the escalating need for maintenance of the Dartford Crossing. The Dartford Crossing is already operating significantly over capacity and suffers from poor reliability. As with any major project, there are significant risks to be managed in order to realise the project’s benefits. We will continue to work with NISTA and apply lessons from the James Stewart review of High Speed 2 to help minimise those risks. Further work will be completed in the next stages of the programme up to FBC at which point the accounting officer assessment will be refreshed. As the benefits are expected to be felt for several decades, the figures in the Annual Assessment may differ to those in this narrative due to NISTA deflating benefits post 2050.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 improved from Amber to Green. This is primarily due to the following factors‚ The LTC project secured additional public funding with £1.66bn in the Third Road Investment Strategy for the years 2026/27 and 2028/29 which includes the £891m announced at Autumn…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"DFT_0022_1415-Q4","year":2025,"name":"LOWER THAMES CROSSING","department":"DfT","category":"Infrastructure and Construction","description":"The Lower Thames Crossing (LTC) is a proposed new expressway connecting Kent, Thurrock and Essex through twin-bored tunnels under the Thames. It will almost double the road capacity across the River Thames east of London and is the largest single road investment project in the UK since the M25 was completed more than 30 years ago. As a vital part of the UKs transport infrastructure, it will act as a catalyst for national and local economic growth. Building a reliable, modern new road that is fit for the future will help connect the nation's busiest ports to the distribution hubs in the North, Midlands and beyond. It will improve network resilience and the performance of the existing crossings at Dartford, transforming the regional and national road network. LTC will open up new markets for businesses and create tens of thousands of new jobs and hundreds of apprenticeships during its construction.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The DCO decision date was the subject of a Written Ministerial Statement and was extended from the 4 October 2024 until 23 May 2025, with consent granted on 25 March 2025. The key strategic risks remain mainly on the complexity of the activity needed to take the Project through to future funding decisions.","startDate":"2014-05-30","endDate":"2034-04-20","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 20/04/2034. This is primarily due to the following factors‚ The project was subject to a Written Ministerial Statement on the 9 March 2023 re-phasing construction by 2 Years. The programme was re-baselined to reflect the March 2023 Written Ministerial Statement. This had a direct impact on the Open for Traffic date. This baseline is no longer viable after a second Written Ministerial Statement was issued on the 4 October 2024 extending the Development Consent Order Decision date until 23 May 2025 in order to allow more time for the application to be considered further, including as part of the spending review [Development Consent Order Consent granted 25 March 2025]. The project is currently working on the impact to the Open for Traffic following the second Written Ministerial Statement.","fyBaseline":203.0,"fyForecast":203.0,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":8950.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 8950. This is primarily due to the following factors‚ The project's departmentally agreed Whole Life Cost at 24/25-Q4 is 8950m. The project is currently forecasting within the approved budget. The spending review 2025 and the formal decision on the preferred funding option could impact the whole life costs of the project.","benefits":3009.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 3009. This is primarily due to the following factors‚ The departmentally agreed Benefits at 24/25-Q4 remained at 3009m. Formal decision on the preferred funding option could impact the benefits.","themes":["Cost & funding","Approvals & decisions","Governance & assurance","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The DCO decision date was the subject of a Written Ministerial Statement and was extended from the 4 October 2024 until 23 May 2025, with consent granted on 25 March…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":467,"attentionScore":38,"attentionReasons":["Current published delivery confidence is Amber","Published end date moved 467 days later"]},{"id":"CO_0438_2425-Q3","year":2026,"name":"Manchester Digital Campus","department":"CO","category":"Infrastructure and Construction","description":"Manchester Digital Campus (MDC) will deliver two large office buildings on a brown field site in Central Manchester for 8800 FTE; it will collocate digitally focused departments in a central location as a Government Hub. MDC is a transformative programme that will create a Civil Service community centred on digital skills and the growth potential of the sector in the North West economy. MDC will foster greater cross-government collaboration and enable role relations into Manchester through Places for Growth.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Exempt under Section 24 - National security","startDate":"2025-04-07","endDate":"2032-12-17","scheduleNarrative":"Exempt under Section 24 - National security","fyBaseline":33.42,"fyForecast":33.42,"fyVariance":0.0,"varianceNarrative":"Since the last report, the OBC has been endorsed (Mar 26). The OBC has the baseline benefits for the Programme which to ensure standardisation of publishing are now discounted (£3,051.896M). This accounts for the variation between previous reports (which weren't discounted). The OBC cost shows a small reduction. This is due to a new cost plan at the end of RIBA3 and the result of a value engineering exercise.","wholeLifeCost":1029.78,"costNarrative":"Exempt under Section 24 - National security","benefits":2009.35,"benefitsNarrative":"Exempt under Section 24 - National security","themes":["Cost & funding","Technical & integration"],"evidenceExcerpt":"Exempt under Section 24 - National security Exempt under Section 24 - National security","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"CO_0438_2425-Q3","year":2025,"name":"Manchester Digital Campus","department":"CO","category":"Government Transformation and Service Delivery","description":"Section 24 - National security","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Section 24 - National security","startDate":"2025-04-05","endDate":"2030-12-27","scheduleNarrative":"The project's end-date at 24/25-Q4 is scheduled to be 27/12/2030. This is primarily due to the following factors‚ Project delivery remains Dec 30.","fyBaseline":0.0,"fyForecast":0.0,"fyVariance":null,"varianceNarrative":"The budget variance is less than or equal to 5%. Agreed","wholeLifeCost":1443.7,"costNarrative":"Section 24 - National security","benefits":null,"benefitsNarrative":"Section 24 - National security","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Section 24 - National security The project's end-date at 24/25-Q4 is scheduled to be 27/12/2030. This is primarily due to the following factors‚ Project delivery remains Dec 30.","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"CO_0438_2425-Q3","year":2026,"name":"Manchester Digital Campus","department":"CO","category":"Infrastructure and Construction","description":"Manchester Digital Campus (MDC) will deliver two large office buildings on a brown field site in Central Manchester for 8800 FTE; it will collocate digitally focused departments in a central location as a Government Hub. MDC is a transformative programme that will create a Civil Service community centred on digital skills and the growth potential of the sector in the North West economy. MDC will foster greater cross-government collaboration and enable role relations into Manchester through Places for Growth.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Exempt under Section 24 - National security","startDate":"2025-04-07","endDate":"2032-12-17","scheduleNarrative":"Exempt under Section 24 - National security","fyBaseline":33.42,"fyForecast":33.42,"fyVariance":0.0,"varianceNarrative":"Since the last report, the OBC has been endorsed (Mar 26). The OBC has the baseline benefits for the Programme which to ensure standardisation of publishing are now discounted (£3,051.896M). This accounts for the variation between previous reports (which weren't discounted). The OBC cost shows a small reduction. This is due to a new cost plan at the end of RIBA3 and the result of a value engineering exercise.","wholeLifeCost":1029.78,"costNarrative":"Exempt under Section 24 - National security","benefits":2009.35,"benefitsNarrative":"Exempt under Section 24 - National security","themes":["Cost & funding","Technical & integration"],"evidenceExcerpt":"Exempt under Section 24 - National security Exempt under Section 24 - National security","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"CO_0438_2425-Q3","year":2025,"name":"Manchester Digital Campus","department":"CO","category":"Government Transformation and Service Delivery","description":"Section 24 - National security","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Section 24 - National security","startDate":"2025-04-05","endDate":"2030-12-27","scheduleNarrative":"The project's end-date at 24/25-Q4 is scheduled to be 27/12/2030. This is primarily due to the following factors‚ Project delivery remains Dec 30.","fyBaseline":0.0,"fyForecast":0.0,"fyVariance":null,"varianceNarrative":"The budget variance is less than or equal to 5%. Agreed","wholeLifeCost":1443.7,"costNarrative":"Section 24 - National security","benefits":null,"benefitsNarrative":"Section 24 - National security","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Section 24 - National security The project's end-date at 24/25-Q4 is scheduled to be 27/12/2030. This is primarily due to the following factors‚ Project delivery remains Dec 30.","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":721,"attentionScore":38,"attentionReasons":["Current published delivery confidence is Amber","Published end date moved 721 days later"]},{"id":"MOJ_0064_2122-Q3","year":2026,"name":"Prisoner Education Services","department":"MOJ","category":"Government Transformation and Service Delivery","description":"The programme has three main objectives: 1. Improve the numeracy and literacy of all prisoners who need it 2. Incentivise prisoners to improve their qualifications and skills to increase prospects of finding work/integrating back into society 3. Ensure Governors and their teams have the knowledge, tools and support they need to lead this work.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25-Q4, the Delivery Confidence Assessment has remained Amber. This is primarily due to uncertainty regarding limited contingency for the project’s final procurement activity.","startDate":"2021-04-01","endDate":"2027-01-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project’s end date at 25/26-Q4 has changed from 31/12/25 to 31/01/27. This is primarily due to delays in the procurement of one element of the core education contract.","fyBaseline":190.73,"fyForecast":183.39,"fyVariance":3.85,"varianceNarrative":"The budget variance is less or equal to 5%.","wholeLifeCost":1755.13,"costNarrative":"Compared to financial year 24/25-Q4, the Whole Life Costs at 25/26-Q4 have decreased from £1,870.80m to £1755.13m. The budget remains aligned to the current baseline business case. All costs have been reported in 2024/25 base prices in line with NISTA requirements. This is a change from previous years where costs were reported in nominal prices. All costs reflect this accounting reduction regardless of any actual changes.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 remained at 0. This programme currently reports no monetised benefits. The programme's benefits are related to the successful onward operation of the Prisoner Education Service.","themes":["Cost & funding","Commercial & supply chain","Approvals & decisions","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 24/25-Q4, the Delivery Confidence Assessment has remained Amber. This is primarily due to uncertainty regarding limited contingency for the project’s final procurement activity. Compared to financial year 24/25-Q4, the project’s end date at 25/26-Q4 has changed from 31/12/25 to 31/01/27. This is primarily due to delays in the…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"MOJ_0064_2122-Q3","year":2023,"name":"Prisoner Education Services","department":"MOJ","category":"Government Transformation and Service Delivery","description":"The Prisoner Education Service is part of the Reducing Reoffending Portfolio within His Majesty's Prison and Probation Service. The programme has three main objectives: 1. Improve the numeracy and literacy of all prisoners who need it 2. Incentivise prisoners to improve their qualifications and skills to increase prospects of finding work/integrating back into society 3. Ensure Governors and their teams have the knowledge, tools and support they need to lead this work.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 is Amber. This is primarily due to the following factors. This is thefirst timedata has been published for this project, which has been added to GMPP over the last year.The Amber assessment is driven by inflation risks.","startDate":"2021-04-01","endDate":"2025-06-30","scheduleNarrative":"The project's end-date at 22/23-Q4 is 2025-06-30. This is primarily due to the following factors. The programme is on track to deliver against the baseline schedule.","fyBaseline":3.5,"fyForecast":3.5,"fyVariance":0.0,"varianceNarrative":"Variance is less than 5%, so no narrative required","wholeLifeCost":1884.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 22/23-Q4 is 1884m. This is primarily due to the following factors. The Whole life costs are based on the most recent business case and include optimism bias.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This project currently reports no monetised benefits. The project's benefits are related to the successful onward operation of the Prison Education service.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 is Amber. This is primarily due to the following factors. This is thefirst timedata has been published for this project, which has been added to GMPP over the last year.The Amber assessment is driven by inflation risks. The project's end-date at 22/23-Q4 is 2025-06-30.…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"MOJ_0064_2122-Q3","year":2024,"name":"Prisoner Education Services","department":"MOJ","category":"Government Transformation and Service Delivery","description":"The Prisoner Education Service is part of the Rehabilitation Directorate within His Majesty's Prison and Probation Service. The programme has three main objectives: 1. Improve the numeracy and literacy of all prisoners who need it 2. Incentivise prisoners to improve their qualifications and skills to increase prospects of finding work/integrating back into society 3. Ensure Governors and their teams have the knowledge, tools and support they need to lead this work.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 22/23-Q4, the Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber(SRO rating). This is primarily due to the following factors. Inflation risks contributing to increasing estimated cost of delivery, offset by a reduction in delivery.","startDate":"2021-04-01","endDate":"2025-06-30","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2025-06-30. This is primarily due to the following factors. The project is on track to deliver against the baseline schedule.","fyBaseline":190.6,"fyForecast":190.6,"fyVariance":0.0,"varianceNarrative":"The budget variance is inferior or equal to 5%.","wholeLifeCost":1581.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 decreased from 1884m. to 1581m. This is primarily due to the following factors. The decrease reflects the updated Outline Business Case costs.","benefits":0.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 0m. This project currently reports no monetised benefits. The project's benefits are related to the successful onward operation of the Prisoner Education Service.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber(SRO rating). This is primarily due to the following factors. Inflation risks contributing to increasing estimated cost of delivery, offset by a reduction in delivery. Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"MOJ_0064_2122-Q3","year":2025,"name":"Prisoner Education Services","department":"MoJ","category":"Government Transformation and Service Delivery","description":"The Prisoner Education Service is part of the Rehabilitation Directorate within His Majesty's Prison and Probation Service. The programme has three main objectives: 1. Improve the numeracy and literacy of all prisoners who need it 2. Incentivise prisoners to improve their qualifications and skills to increase prospects of finding work/integrating back into society 3. Ensure Governors and their teams have the knowledge, tools and support they need to lead this work.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Tranche 1 delivery is complete, and Tranche 2 has inherent risks to its timeline.","startDate":"2021-04-01","endDate":"2025-12-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 30/06/2025 to 31/12/2025. This is primarily due to the following factors‚ The schedule was re-baselined to allow for finalisation of the new Core Education contracts and to increase the mobilisation duration.","fyBaseline":213.2,"fyForecast":200.17,"fyVariance":6.11,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The underspend is due to delays in digital mobilisation implementation requiring some costs to be re-profiled into future financial years and reduced Prison Education Framework contract costs.","wholeLifeCost":1870.8,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 1581 to 1870. This is primarily due to the following factors‚ The increase reflects the updated Full Business Case costs and include the cost of extending the existing Prisoner Education Framework contracts as per the Strategic Outline Business Case.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ This programme currently reports no monetised benefits. The programme's benefits are related to the successful onward operation of the Prisoner Education Service.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Tranche 1 delivery is complete, and Tranche 2 has inherent risks to its timeline. Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"MOJ_0064_2122-Q3","year":2026,"name":"Prisoner Education Services","department":"MOJ","category":"Government Transformation and Service Delivery","description":"The programme has three main objectives: 1. Improve the numeracy and literacy of all prisoners who need it 2. Incentivise prisoners to improve their qualifications and skills to increase prospects of finding work/integrating back into society 3. Ensure Governors and their teams have the knowledge, tools and support they need to lead this work.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25-Q4, the Delivery Confidence Assessment has remained Amber. This is primarily due to uncertainty regarding limited contingency for the project’s final procurement activity.","startDate":"2021-04-01","endDate":"2027-01-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project’s end date at 25/26-Q4 has changed from 31/12/25 to 31/01/27. This is primarily due to delays in the procurement of one element of the core education contract.","fyBaseline":190.73,"fyForecast":183.39,"fyVariance":3.85,"varianceNarrative":"The budget variance is less or equal to 5%.","wholeLifeCost":1755.13,"costNarrative":"Compared to financial year 24/25-Q4, the Whole Life Costs at 25/26-Q4 have decreased from £1,870.80m to £1755.13m. The budget remains aligned to the current baseline business case. All costs have been reported in 2024/25 base prices in line with NISTA requirements. This is a change from previous years where costs were reported in nominal prices. All costs reflect this accounting reduction regardless of any actual changes.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 remained at 0. This programme currently reports no monetised benefits. The programme's benefits are related to the successful onward operation of the Prisoner Education Service.","themes":["Cost & funding","Commercial & supply chain","Approvals & decisions","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 24/25-Q4, the Delivery Confidence Assessment has remained Amber. This is primarily due to uncertainty regarding limited contingency for the project’s final procurement activity. Compared to financial year 24/25-Q4, the project’s end date at 25/26-Q4 has changed from 31/12/25 to 31/01/27. This is primarily due to delays in the…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"MOJ_0064_2122-Q3","year":2025,"name":"Prisoner Education Services","department":"MoJ","category":"Government Transformation and Service Delivery","description":"The Prisoner Education Service is part of the Rehabilitation Directorate within His Majesty's Prison and Probation Service. The programme has three main objectives: 1. Improve the numeracy and literacy of all prisoners who need it 2. Incentivise prisoners to improve their qualifications and skills to increase prospects of finding work/integrating back into society 3. Ensure Governors and their teams have the knowledge, tools and support they need to lead this work.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Tranche 1 delivery is complete, and Tranche 2 has inherent risks to its timeline.","startDate":"2021-04-01","endDate":"2025-12-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 30/06/2025 to 31/12/2025. This is primarily due to the following factors‚ The schedule was re-baselined to allow for finalisation of the new Core Education contracts and to increase the mobilisation duration.","fyBaseline":213.2,"fyForecast":200.17,"fyVariance":6.11,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The underspend is due to delays in digital mobilisation implementation requiring some costs to be re-profiled into future financial years and reduced Prison Education Framework contract costs.","wholeLifeCost":1870.8,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 1581 to 1870. This is primarily due to the following factors‚ The increase reflects the updated Full Business Case costs and include the cost of extending the existing Prisoner Education Framework contracts as per the Strategic Outline Business Case.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ This programme currently reports no monetised benefits. The programme's benefits are related to the successful onward operation of the Prisoner Education Service.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Tranche 1 delivery is complete, and Tranche 2 has inherent risks to its timeline. Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":396,"attentionScore":38,"attentionReasons":["Current published delivery confidence is Amber","Published end date moved 396 days later"]},{"id":"BEIS_0014_2021-Q4","year":2026,"name":"SOCIAL HOUSING DECARBONISATION FUND","department":"DESNZ","category":"Infrastructure and Construction","description":"The SHDF capital programme, which includes new projects delivering as the Warm Homes: Social Housing Fund since April 2025, is designed to improve the energy performance of social housing through targeted investment and collaborative engagement with social housing landlords, funding the installation of energy efficiency measures and low-carbon technologies in social homes. SHDF began delivery in 2021 through the SHDF Demonstrator, and the latest project, WH:SHF Wave 3, begun in Spring 2025.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 remains at Amber. This reflects sustained delivery progress across the programme, effective management of previously identified risks, and increased confidence in the programme’s ability to deliver its objectives within agreed parameters. In particular, the programme successfully launched a new scheme (Wave 3) and is forecasting to have delivered nearly all of its capital budget for 25/26. The overall programme reached a notable milestone, with the 100,000th energy efficiency measure installed during 25/26, demonstrating the scale and impact of the scheme to date. Wave 2 concluded delivery on the majority of projects, with residual activity focused on formal closure, reconciliation, and assurance processes agreed for the first quarter of 26/27. The Wave 2 project is on track to meet FBC targets. Wave 3 entered active delivery with all Grant Funding Agreements in place and projects progressing through delivery phases as planned. Delivery momentum strengthened during the year, evidenced by increased grant drawdowns and phase requests, demonstrating that projects are mobilised and delivering at scale. As at end of March, the delivery team are confident that close to the capital budget was successfully spent by grant recipients. Programme governance and controls continued to mature over the reporting period, with progress made in addressing assurance recommendations, improving data quality and reporting, and embedding lessons learned from earlier waves. The programme received a joint Amber at Gateway 3 assurance in Q4. Overall, the Green DCA rating for 25/26 reflects the demonstrable delivery progress on both outcomes and financial outturn. Sustaining this delivery confidence will only be possible if the programme receives strong support for resourcing needs, with proactive support as part of wider departmental transformation taking place in Q1/Q2.","startDate":"2020-09-09","endDate":"2030-03-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same.","fyBaseline":332.82,"fyForecast":332.43,"fyVariance":0.12,"varianceNarrative":"The budget variance is less than 5%, due to tight forecasting controls","wholeLifeCost":2256.29,"costNarrative":"Baseline WLC remain unchanged as per the latest agreed business case.","benefits":5582.9,"benefitsNarrative":"The project's departmentally agreed Benefits for 25/26-Q4 have not changed.","themes":["Delivery & schedule","Cost & funding","Governance & assurance","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 24/25, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 remains at Amber. This reflects sustained delivery progress across the programme, effective management of previously identified risks, and increased confidence in the programme’s ability to deliver its objectives within agreed parameters. In particular, the…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"BEIS_0014_2021-Q4","year":2021,"name":"Social Housing Decarbonisation Fund","department":"BEIS","category":"Infrastructure and Construction","description":"The programme will play a key role in decarbonising social housing over the 2020s, aligning with a number of government and departmental outcomes to help achieve legally binding carbon and fuel poverty targets.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber.This is primarily due to the following factors: Whilst near-term milestones are being met, a number of medium to long-range risks are impacting delivery confidence. Firstly, the Programme team remains under-strength as is enters an intense 12 months period in which it is necessary to undertake major approval and assurance work for both the first two delivery phases and the Programme's Technical Assistance Facility. Secondly, funding for the first phase (Wave 1) commencing delivery in early 2022 has recently been increased from �60m to �160m, adding pressure onto short resources and the necessarily fixed final approval deadline. Finally, the absence of longer term funding certainty beyond Financial Year 21/22 constrains the Fund's ability to signal the degree of confidence needed for the retrofit supply chain to grow sufficiently to meet the cumulative high demand of this and other schemes from 2023 onwards. All risks are being actively mitigated.","startDate":"2020-09-09","endDate":"2030-03-31","scheduleNarrative":"The project end-date is 31 March 2030. This is primarily due to the following factors: The planned schedule for the Programme's first phase (Wave 1) must achieve final approval to proceed in Nov 21 in order that the associated �160m of Financial Year (FY) 21/22 grant funding to Local Authorities is transferred as stipulated within the FY; for the winning projects to be delivered in FY22/23. The larger 3-year second phase (Wave 2) of c�1.1bn is scheduled to achieve final approval as early as feasible in FY 22/23 to maximise period of delivery in order to achieve the planned activity and funding for that year. Any delay to this schedule will be due to selection of an alternative delivery method for this first major wave that that is deemed more effect than the current approach involving award and transfer of grants to Local Authorities.","fyBaseline":55.83,"fyForecast":63.48,"fyVariance":14.0,"varianceNarrative":"The budget variance exceeds 5%. Against our agreed FY 20/21 baseline of �55.82m we were able to agree more CDEL funding through the supplementary estimates process to take forward 3 additional projects","wholeLifeCost":4626.29,"costNarrative":"The projects Baseline Whole Life Cost is �4626.29m. This is primarily due to the following factors: The Programme Whole Life Costs include the capital cost for the programme (�3.8bn ex Vat at 2019 prices) + the costs for the BEIS Integrated Project Delivery Team (administration budget) and programme costs for external delivery and monitoring and evaluation partners.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber.This is primarily due to the following factors: Whilst near-term milestones are being met, a number of medium to long-range risks are impacting delivery confidence. Firstly, the Programme team remains under-strength as is enters an intense 12 months period in which it is…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21"},{"id":"BEIS_0014_2021-Q4","year":2022,"name":"Social Housing Decarbonisation Fund","department":"BEIS","category":"Infrastructure and Construction","description":"The 2019 Conservative Manifesto committed to a £3.8bn Social Housing Decarbonisation Fund over a 10-year period. SHDF will support the ambition set out in the Clean Growth Strategy, that as many homes as possible are improved to Energy Performance Certificate (EPC) band C by 2035, and for all fuel-poor homes to reach this target by 2030. SHDF will play a critical role in meeting legally binding fuel poverty targets as set out in the Fuel Poverty Strategy. Owing to the proposed length of the scheme, and the uncertainty in the decarbonisation environment (e.g., electrification/hydrogen decision ), SHDF will be delivered in four waves. SHDF Wave 1 commitments will build on the findings of the SHDF Demonstrator project, scaling up supply chain capacity and knowledge as in advance of the larger, longer-term Wave 2 which has recently been confirmed in Spending Review 21.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 remained at Amber \"Programme: The programme team continues to grow in both capacity and capability in the context of a complicated programme. The CSR 21 provides certainty for the program over the next 3 years but the programme is seeking to expand the commitment to cover the totality of Wave 2 whilst providing certainty for future waves. The demonstrator project is currently preparing for closure later in financial year 22/23 and learning the appropriate lessons from there remains a priority. Wave 1: All MoUs have been signed, returned and the grant funding issued by the end of March 2023. A total of around £179.5m was sent to 69 Local Authorities and delivery on those projects has commenced. The Wave 1 Project hosted a launch conference (Energise) in March 2023 to build momentum and kick start the delivery of the projects. The fist monthly report was due for submission on the 10th working day of April, and the DSAs are continued to be signed and returned. To date 55/69 DSAs are completed. Wave 2: Work is underway to cement the policy position for Wave 2 in advance of the OBC in June which will then be followed by the launch of the competition in August. \" SHDF Wave 1 Project underwent an IPA Gate 3 review in November 2021, receiving a Red Rating. An assurance of action plan (AAP) was developed addressing 9 key recommendations and 3 blockers. The Wave 1 Project underwent a Gate 3 re-review in January 2022, receiving an Amber rating. Five key recommendations were fully addressed as part of the AAP, four actions required further attention. Since January, two further recommendations have been closed through the passing of PIC and by fully resourcing the team, leaving 2 recommendations (supply chain capacity and delivery plans) ongoing. These actions are currently progressing and will continue throughout the delivery of the Project.","startDate":"2020-09-09","endDate":"2030-03-31","scheduleNarrative":"Compared to 2021-Q4, your project end-date remained scheduled to finish on 31 MAR 2030 . This is primarily due to the following factors: The Wave 1 Project issued £187.5m grant funding prior to the end of the financial year and delivery has commenced on those projects. Wave 2 currently remains on track to deliver financial payments as planned.","fyBaseline":65.33,"fyForecast":184.77,"fyVariance":185.0,"varianceNarrative":"The budget variance exceeds 5%. The budget variance exceeds 5%. This is primarily due to the initial agreed baseline for FY21/22 being £160m. However, in September 21, due to the high number of good bids received for SHDF W1, this amount increased to c£180m. It was agreed that the under-spend in other EEL Schemes would cover the overspend in SHDF, allowing the team to fund a great number of projects. The team was able to spend all this amount by the end of FY21/22, after funding all predicted LA Projects successfully through Section 31.","wholeLifeCost":4721.0,"costNarrative":"Compared to2021-Q4, the projects Baseline Whole Life Cost increased from 4626.29 (£m) to 4720.96 (£m). This is primarily due to the following factors: An increased allocation to the Wave 1 project due to high number of bids received. Also an increased Programme Admin costs due to more resources required to deliver the programme; the SHDF team has informed Central Finance of the potential Admin overspend from the beginning of the FY21/22.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Workforce & capability","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 remained at Amber \"Programme: The programme team continues to grow in both capacity and capability in the context of a complicated programme. The CSR 21 provides certainty for the program over the next 3 years but the programme is…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"BEIS_0014_2021-Q4","year":2023,"name":"Social Housing Decarbonisation Fund","department":"DESNZ","category":"Infrastructure and Construction","description":"The 2019 Conservative Manifesto committed to a 3.8bn Social Housing Decarbonisation Fund over a 10-year period. SHDF will support the ambition set out in the Clean Growth Strategy, that as many homes as possible are improved to Energy Performance Certificate (EPC) band C by 2035, and for all fuel-poor homes to reach this target by 2030. SHDF will play a critical role in meeting legally binding fuel poverty targets as set out in the Fuel Poverty Strategy. Owing to the proposed length of the scheme, and the uncertainty in the decarbonisation environment (e.g., electrification/hydrogen decision ), SHDF will be delivered in four waves. SHDF Wave 1 commitments will build on the findings of the SHDF Demonstrator project, scaling up supply chain capacity and knowledge as in advance of the larger, longer-term Wave 2 which has recently concluded its first and major competition phase, with successful bids under Wave 2.1 announced in March 2023.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. There has been considerable progress on the SHDF Programme over 22/23. The Programme is well placed to deliver whilst recognising risks on mobilisation, cost and quality on Wave 1 and Wave 2. The Demonstrator in the last quarter of 22/23 achieved a green at Gateway 5 confirming the benefits/learning it provided to the longer-term direction of the SHDF Programme. Wave 1 issued 187.5 million in grant funding prior to the start of 22/23 with delivery continuing throughout this year. In Q4, Wave1 re-baselined following HMT approval for the grant spend window to extend to the end of June 2023.On Wave 2, a competition launched in Autumn 2022, the outcome of which was the award of 778m of grant funding to 107 projects, with a further 1.1bn committed as match funding. A Delivery Agent (Salix Finance) is in place to support delivery, alongside a Delivery Partner which has been procured with contract award expected to be in late April 23.","startDate":"2020-09-09","endDate":"2030-03-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2030-03-31. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2030-03-31. This is primarily due to the following factors. The SHDF programme continues to deliver and, subject to funding being allocated at a future fiscal event, it is expected to continue to deliver to the Programme end date in 2030. The Demonstrator is formally closing as a project, Wave 1 delivery continues as planned with delivery expected to be completed in 2023 and Wave 2 delivery commences at the start of financial year 23/24 for delivery through to 2025.","fyBaseline":251.22,"fyForecast":13.32,"fyVariance":-95.0,"varianceNarrative":"The budget variance exceeds 5%. The annual total budget variance exceeds 5%. This is primarily due to the initial agreed CDEL baseline in this report for FY22 /23 being 236m, where the budget allocated was actually 80m. The CDEL and RDEL budgets were underspent due to Wave 2 competition outcomes being known too late to enable maximum delivery in the financial year 22/23.","wholeLifeCost":4721.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 remained at 4721m. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 remained at 4721m. This is primarily due to the following factors. Whole Life Costs remain unchanged for the programme from FY 21/22.","benefits":10326.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 10326m. The Demonstrator project learnings have been shared across the wider SHDF programme, resulting in the active consideration and application of lessons learned with a focus on deriving greater benefits in the delivery of future Waves of the SHDF programme.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. There has been considerable progress on the SHDF Programme over 22/23. The Programme is well placed to deliver whilst recognising risks on mobilisation, cost and…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"BEIS_0014_2021-Q4","year":2024,"name":"Social Housing Decarbonisation Fund","department":"DESNZ","category":"Infrastructure and Construction","description":"The programme originates from a 3.8 bn pledge in the 2019 Manifesto to help decarbonise social housing in England over the period to 2030. SHDF intends to raise up to 900 k of the circa 1.4 m social homes below EPC band C to that level of energy efficiency, as a positive step on the pathway to the achievement of Net Zero for all 4 m social homes by 2050. The Programme is to be delivered over a series of Waves, providing the necessary flexibility of scheme design and delivery method over a decade of unpredictable policy and regulation. A 60 m Demonstrator Project has been delivered over FYs 21/22 and 22/23, with the 179m Wave 1 being delivered over FY22/23 and into 23/24. Following the SR21 settlement, a further 800m up to FY 24/25 has been secured for Wave 2, with future Waves subject to funding being allocated in future fiscal events. On Wave 2, 778m of funding was announced on 22/03/23 to fund 107 projects under 'Wave 2.1', with a further 1.1bn committed as match funding. Wave 2.2 was announced in October 2023, with successful projects awarded funding in March 2024.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The SHDF Programme is progressing well with projects at different points of the project life cycle. As at end of March 2024, SHDF Wave 1 is on course to conclude all closure activity during Q1 of 24/25, and is anticipated to achieve all of its benefits, including carbon reduction and treating a significant number of homes, thus contributing to the goal of reducing fuel poverty. The final evaluation of Wave 1's impact is due in Autumn 2025. Wave 2.1 has seen an increase in measures installed in households, however there is still work to do to ensure delivery reaches the necessary trajectory in year 2 of delivery to achieve scheme benefits. Successful applicants to SHDF Wave 2.2 were announced in March 2024, with grant funding payments due to commence in Q1 of 24/25. A GIAA Audit of the Programme's Lessons Learned approach took place in Q4 and returned a good or 'substantive' marking, demonstrating the success of the programme to date in learning and implementing lessons. SHDF Wave 3 is anticipated to progress to final approvals to commence delivery in 24/25, and received an Amber rating in March 2024 from an IPA Gateway 2 review.","startDate":"2020-09-09","endDate":"2030-03-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2030-03-31. This is primarily due to the following factors. Significant progress on the SHDF Programme included commencing project closure for Wave 1, delivery of Wave 2.1 and successful applicants into Wave 2.2. SHDF Is reasonably placed to deliver despite resourcing challenges. Wave 1 formally closed on 31 December 2023, with grant recipients closing projects through Jan-March 2024. By January 2024, there were c.27,000 measures installed in c.14,100 households under Wave 1. Wave 2.1, are working with finance and HMT to ensure accuracy on grant spend accounts. c.4,500 measures installed in c.2,500 households by January 2024. Following closure of the Wave 2.2 competition, 42 successful projects were announced, totalling 75.5m in grant funding. Wave 3 funding for 2025-28 was announced on 18 December 2023. Salix manage the Delivery Partner to enable delivery across Wave 2 and procurement of a delivery partner to support Wave 3. The Technical Assistance Facility contract was awarded to Turner and Townsend, signed in February 2024.","fyBaseline":320.04,"fyForecast":270.66,"fyVariance":-15.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. Known underspends and clawbacks from projects have contributed to the variance - however end of year finance reconcilliation activity will not conclude until May - so figures included in the cost will be amended in May 2024 and should not be used until DESNZ has confirmed a final figure for public use. The commencement of SHDF Wave 2.1 has seen a signficiant scale up in delivery and changes to our approach to accounting - lessons will be taken forward to ensure accurate financial reporting. _x000D_ DN: DESNZ have advised of issue with OSCAR Portal meaning incorrect costs will be recorded on the system","wholeLifeCost":4558.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 decreased from 4721m. to 4558m. This is primarily due to the following factors. Whole Life Costs for SHDF have been updated to account for the addition of SHDF Wave 2.2 (4558.82)","benefits":9619.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 2324-Q4 decreased from 10326m. to 9619m. This benefit is estimated using the same methodology as in tab 10. The baseline monetised benefits have increased since the last GMPP return due to GDP deflator updates and the inclusion of the DESNZ PIC-approved Wave 2.2 FBC impacts. Once Wave 1 closure activities have completed, the final benefits position, and lessons learned throughout delivery will be disseminated across the programme.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The SHDF Programme is progressing well with projects at different points of the project life cycle. As at end of March 2024, SHDF Wave 1 is on course to conclude all…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"BEIS_0014_2021-Q4","year":2025,"name":"SOCIAL HOUSING DECARBONISATION FUND","department":"DESNZ","category":"Infrastructure and Construction","description":"The SHDF capital programme (with new projects delivering as the Warm Homes: Social Housing Fund after April 2025) is designed to improve the energy performance of social housing through targeted investment and collaborative engagement with social housing landlords, funding the installation of energy efficiency measures and low-carbon technologies in social homes. SHDF began delivery in 2021 through the SHDF Demonstrator, and the latest project, Wave 3, will begin in Spring 2025. SHDF is a key pillar of the Government's Clean Energy Mission, by reducing carbon emissions produced by social homes. SHDF has the following specific aims: • Improve Energy Efficiency: Upgrade social homes to at least the EPC C standard. • Reduce Carbon Emissions: Contribute to the UK’s Net Zero targets by decarbonising housing • Tackle Fuel Poverty: Lower energy bills for tenants • Support Green Jobs: Stimulate employment in the retrofit and construction sectors. • Enhance Tenant Well-being: Improve comfort, health, and quality of life for residents. • Build Sector Capability: Develop skills, supply chains, and capacity for future retrofit projects","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Good progress has continued across the SHDF programme with SHDF Wave 2 in delivery and WH:SHF Wave 3 funding allocations announced in March 2025 for delivery through to 2028. Delivery confidence remains amber due to the programme’s high complexity and its dependency on a number of external factors.","startDate":"2020-09-09","endDate":"2028-10-01","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2030. This is primarily due to the following factors‚ The last programme business case from 2022 assumed delivery through to 2030. Data in this return has been amended to include business case information only to the end of Wave 3 delivery in 2028, as funded from the first phase of the 2025 spending review in Autumn 2024. Delivery beyond 2028 is subject to further spending review decisions.","fyBaseline":515.96,"fyForecast":472.4,"fyVariance":8.44,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The programme has demonstrated strong financial performance in 24/25, with over 90% of the allocated capital funding forecast to have been spent in 2024/25, representing an estimated £453m against an allocation of £495.5m. While there has been a slight variance in capital expenditure against the forecast, this reflects adjustments made during delivery, as some projects have amended project plans and altered their scope. In addition, SHDF is forecast to have spent 95% of its allocated RDEL budget. These numbers are provisional as at May 2025 and have been provided prior to final audit and review and may be subject to further revisions.","wholeLifeCost":2206.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 4558 to 2226. This is primarily due to the following factors‚ The last programme business case from 2022 assumed delivery through to 2030. Data in this return has been amended to include business case information only to the end of Wave 3 delivery in 2028, as funded from the first phase of the 2025 spending review in Autumn 2024. Delivery beyond 2028 is subject to further spending review decisions.","benefits":5737.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) decreased from 9619 to 5737. This is primarily due to the following factors‚ The Programme has recalibrated its benefit estimates in accordance with the latest approved project business case, which is for WH:SHF Wave 3, approved in Q4 of 24/25. This supersedes previous programme business cases which provided an estimate extending beyond this time period. Benefits will be revised should further funding be confirmed in future fiscal events.","themes":["Delivery & schedule","Cost & funding","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Good progress has continued across the SHDF programme with SHDF Wave 2 in delivery and WH:SHF Wave 3 funding allocations announced in March 2025 for delivery through…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"BEIS_0014_2021-Q4","year":2026,"name":"SOCIAL HOUSING DECARBONISATION FUND","department":"DESNZ","category":"Infrastructure and Construction","description":"The SHDF capital programme, which includes new projects delivering as the Warm Homes: Social Housing Fund since April 2025, is designed to improve the energy performance of social housing through targeted investment and collaborative engagement with social housing landlords, funding the installation of energy efficiency measures and low-carbon technologies in social homes. SHDF began delivery in 2021 through the SHDF Demonstrator, and the latest project, WH:SHF Wave 3, begun in Spring 2025.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 remains at Amber. This reflects sustained delivery progress across the programme, effective management of previously identified risks, and increased confidence in the programme’s ability to deliver its objectives within agreed parameters. In particular, the programme successfully launched a new scheme (Wave 3) and is forecasting to have delivered nearly all of its capital budget for 25/26. The overall programme reached a notable milestone, with the 100,000th energy efficiency measure installed during 25/26, demonstrating the scale and impact of the scheme to date. Wave 2 concluded delivery on the majority of projects, with residual activity focused on formal closure, reconciliation, and assurance processes agreed for the first quarter of 26/27. The Wave 2 project is on track to meet FBC targets. Wave 3 entered active delivery with all Grant Funding Agreements in place and projects progressing through delivery phases as planned. Delivery momentum strengthened during the year, evidenced by increased grant drawdowns and phase requests, demonstrating that projects are mobilised and delivering at scale. As at end of March, the delivery team are confident that close to the capital budget was successfully spent by grant recipients. Programme governance and controls continued to mature over the reporting period, with progress made in addressing assurance recommendations, improving data quality and reporting, and embedding lessons learned from earlier waves. The programme received a joint Amber at Gateway 3 assurance in Q4. Overall, the Green DCA rating for 25/26 reflects the demonstrable delivery progress on both outcomes and financial outturn. Sustaining this delivery confidence will only be possible if the programme receives strong support for resourcing needs, with proactive support as part of wider departmental transformation taking place in Q1/Q2.","startDate":"2020-09-09","endDate":"2030-03-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same.","fyBaseline":332.82,"fyForecast":332.43,"fyVariance":0.12,"varianceNarrative":"The budget variance is less than 5%, due to tight forecasting controls","wholeLifeCost":2256.29,"costNarrative":"Baseline WLC remain unchanged as per the latest agreed business case.","benefits":5582.9,"benefitsNarrative":"The project's departmentally agreed Benefits for 25/26-Q4 have not changed.","themes":["Delivery & schedule","Cost & funding","Governance & assurance","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 24/25, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 remains at Amber. This reflects sustained delivery progress across the programme, effective management of previously identified risks, and increased confidence in the programme’s ability to deliver its objectives within agreed parameters. In particular, the…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"BEIS_0014_2021-Q4","year":2025,"name":"SOCIAL HOUSING DECARBONISATION FUND","department":"DESNZ","category":"Infrastructure and Construction","description":"The SHDF capital programme (with new projects delivering as the Warm Homes: Social Housing Fund after April 2025) is designed to improve the energy performance of social housing through targeted investment and collaborative engagement with social housing landlords, funding the installation of energy efficiency measures and low-carbon technologies in social homes. SHDF began delivery in 2021 through the SHDF Demonstrator, and the latest project, Wave 3, will begin in Spring 2025. SHDF is a key pillar of the Government's Clean Energy Mission, by reducing carbon emissions produced by social homes. SHDF has the following specific aims: • Improve Energy Efficiency: Upgrade social homes to at least the EPC C standard. • Reduce Carbon Emissions: Contribute to the UK’s Net Zero targets by decarbonising housing • Tackle Fuel Poverty: Lower energy bills for tenants • Support Green Jobs: Stimulate employment in the retrofit and construction sectors. • Enhance Tenant Well-being: Improve comfort, health, and quality of life for residents. • Build Sector Capability: Develop skills, supply chains, and capacity for future retrofit projects","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Good progress has continued across the SHDF programme with SHDF Wave 2 in delivery and WH:SHF Wave 3 funding allocations announced in March 2025 for delivery through to 2028. Delivery confidence remains amber due to the programme’s high complexity and its dependency on a number of external factors.","startDate":"2020-09-09","endDate":"2028-10-01","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2030. This is primarily due to the following factors‚ The last programme business case from 2022 assumed delivery through to 2030. Data in this return has been amended to include business case information only to the end of Wave 3 delivery in 2028, as funded from the first phase of the 2025 spending review in Autumn 2024. Delivery beyond 2028 is subject to further spending review decisions.","fyBaseline":515.96,"fyForecast":472.4,"fyVariance":8.44,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The programme has demonstrated strong financial performance in 24/25, with over 90% of the allocated capital funding forecast to have been spent in 2024/25, representing an estimated £453m against an allocation of £495.5m. While there has been a slight variance in capital expenditure against the forecast, this reflects adjustments made during delivery, as some projects have amended project plans and altered their scope. In addition, SHDF is forecast to have spent 95% of its allocated RDEL budget. These numbers are provisional as at May 2025 and have been provided prior to final audit and review and may be subject to further revisions.","wholeLifeCost":2206.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 4558 to 2226. This is primarily due to the following factors‚ The last programme business case from 2022 assumed delivery through to 2030. Data in this return has been amended to include business case information only to the end of Wave 3 delivery in 2028, as funded from the first phase of the 2025 spending review in Autumn 2024. Delivery beyond 2028 is subject to further spending review decisions.","benefits":5737.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) decreased from 9619 to 5737. This is primarily due to the following factors‚ The Programme has recalibrated its benefit estimates in accordance with the latest approved project business case, which is for WH:SHF Wave 3, approved in Q4 of 24/25. This supersedes previous programme business cases which provided an estimate extending beyond this time period. Benefits will be revised should further funding be confirmed in future fiscal events.","themes":["Delivery & schedule","Cost & funding","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Good progress has continued across the SHDF programme with SHDF Wave 2 in delivery and WH:SHF Wave 3 funding allocations announced in March 2025 for delivery through…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":546,"attentionScore":38,"attentionReasons":["Current published delivery confidence is Amber","Published end date moved 546 days later"]},{"id":"DWP_0013_2122-Q2","year":2026,"name":"Workplace Transformation","department":"DWP","category":"Government Transformation and Service Delivery","description":"The Workplace Transformation Programme (WTP) is a 10-year programme to support the change to the Department’s operating model, consolidate the estate to the right size and shape and provide more flexible, efficient and better quality sustainable buildings in alignment with the Government’s greening commitments, Places for Growth, and building back better. Throughout the transformation, WTP remains committed to proactively supporting colleagues and customers through this period of change. WTP is working with other Programmes to modernise the services underpinning the DWP ambition of becoming a simpler, cheaper, and more efficient organisation, enabling our people to deliver quality outcomes; reflecting citizens’ and the Modern Civil Service’s needs: enhancing lives; enabling success; and ensuring value. WTP will deliver far more than a smaller, better and greener estate. It will fundamentally reshape our support to customers, how we work, where we work and when we work, helping to make DWP a great place to work. WTP works closely with colleagues delivering the new jobs and careers service, who are setting out the future operating model to transform the Department’s customer facing presence and better support communities. In our Service and Support Centre estate, where colleagues do not see customers face-to-face, the Department is rightsizing the estate to ensure efficiency by only paying for the space we need. This will lead to fewer, larger, multi-product line buildings, investment in some sites we retain to improve the working environment, and, where it is the most cost-effective solution, acquiring new sites. It will also change the way people work through investing in new ways of working, changing the way staff use buildings by more flexible ways of working and to deliver on the Department’s obligations to fully embed Smarter Working and PAS 3000 standards and supporting the shift towards the delivery of digital services. WTP requires significant capital investment but delivers huge financial and social benefits each following year by consolidating and improving our workplace with a direct positive impact on customer experience and outcomes.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The NISTA review carried out during January 2026 assessed the Programme as Amber indicating that WTP is in a good position to deliver further success. It noted that the Programme is well led and has strong inter-personal relationships with key stakeholders. The SRO has agreed the recommendations detailed in the report and an action plan has been developed. Regular updates will be provided to the boards on progress to address the recommendations. The rating recognises the transformation journey the department is on – with a dependency on other transformation programmes and the department’s evolving departmental operating model in terms of understanding the size of the estate, particularly beyond 2030. This includes a dependency on the DWP Target Operating Model (TOM).","startDate":"2020-07-01","endDate":"2031-03-31","scheduleNarrative":"WTP is complex, and as an enabling Programme it has a number of key dependencies including future size of the workforce, how that workforce is deployed, and the underpinning ways services are delivered (the operating model) during modernisation/transformation. The third iteration of the Programme Business Case (PBC) was approved by HMT in June 2025 with a fourth iteration of the Programme Business Case (PBC4) was approved on the 23/03/26 securing approval for a \"Balanced Approach\" to rationalise the estate into a smaller, more efficient, and sustainable footprint starting from FY2026/27. Deliverables achieved within 25-26 include: · Closure of selected Jobcentres and Service and Support Centres · Decommissioned temporary jobcentres established to support customers during the pandemic. Only one temporary jobcentre remains open to the public and this will be converted to a permanent jobcentre. · Completed investment work in Jobcentre and Service and Support Centre sites to improve the standard of buildings. · Progression of high-profile office moves in London · Moved colleagues into ‘award winning’ Fylde View building in Blackpool, contributing to wider local authority plans to regenerate the town centre. · Started construction of new Newcastle hub - due for completion in 2027. · Installation of 255 electric car charging points at over 100 DWP sites saving over 199.76 tonnes of CO2 to date. · Repaired or installed cycle racks at 94 sites. · Installation of Under Setting Sensors to improve our understanding of space utilisation within sites. · Feasibility work to inform future investment and divestment of sites · Launched a lift share app at five pilot sites, reducing travel costs and carbon impacts by facilitating shared commutes to the office. · Led on the implementation of 60% In Office Attendance across the Department.","fyBaseline":532.06,"fyForecast":520.95,"fyVariance":2.09,"varianceNarrative":"The budget variance is less than 5%.","wholeLifeCost":3367.17,"costNarrative":"Compared to financial year 24/25-Q4, the programme’s departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) at £3367.17m. This increase is primarily due to the following factors: The transition from Programme Business Case (PBC2) to the departmentally approved Programme Business case (PBC4). PBC2 focused on Spending Review (SR21) delivery, largely targeting specific projects. PBC4 incorporates more detailed delivery planning for SR25 onwards. Key drivers include: • Revised assumptions following detailed delivery planning for SR25 including changes in the strategy for the number of sites. Previous PBC2 assumptions were based on SR21 hence less refined for future years. • More complex and higher cost projects compared to earlier network design activity. • Updated people impact costs reflecting lease end positions, alternative options, and ministerial decisions. • Updated cost modelling assumptions aligned to current industry benchmarks and construction inflation. • In PBC4 we have reclassified the IFRS 16 (International Financial Reporting Standards) impacts which are no longer part of the financial case cash position based on NISTA (National Infrastructure and Service Transformation Authority) advice","benefits":3938.0,"benefitsNarrative":"Compared to financial year 24/25-Q4, the programme’s departmentally agreed Whole Life Benefits at 25/26-Q4 (measured in £m) decreased to £3938m. This decrease is primarily due to the following factors: • The transition from Programme Business Case (PBC2) to the departmentally approved Programme Business Case (PBC4). PBC2 focused on Spending Review (SR21) delivery, largely targeting specific projects. PBC4 incorporates more detailed delivery planning for SR25 onwards. • Updated assumptions and delivery timelines led to revisions in projected benefits, aligned to the latest cost and phasing data. • In PBC4 we have reclassified the IFRS 16 (International Financial Reporting Standards) impacts which are no longer part of the financial case cash position based on NISTA (National Infrastructure and Service Transformation Authority) advice.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"The NISTA review carried out during January 2026 assessed the Programme as Amber indicating that WTP is in a good position to deliver further success. It noted that the Programme is well led and has strong inter-personal relationships with key stakeholders. The SRO has agreed the recommendations detailed in the report and an action plan has been developed.…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"DWP_0013_2122-Q2","year":2022,"name":"Workplace Transformation","department":"DWP","category":"Government Transformation and Service Delivery","description":"Workplace Transformation is a 10-year programme which supports the change to the Department's operating model and consolidation of its estate portfolio into the right size and shape. It will provide flexible, efficient, better quality and sustainable buildings, in alignment with the Government's Greening commitments, Places for Growth, levelling up the economy and building back better. Delivering far more than estates modernisation, it requires significant capital investment over the early years but delivers financial and social benefits each following year, fundamentally reshaping our support to customers. Workplace Transformation will deliver the Department's obligations to fully embed Smarter Working and achieve PAS3000 standard by December 2022. This will also support changes in how, where and when we work, investing in new more flexible ways of working, changing the way staff use buildings and continuing to support the shift towards the delivery of digital services, helping to make DWP a great place to work.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 is Amber. This is primarily due to the following factors: We are in year one of a ten year programme. The Programme Business Case was approved at the end of March 2022 and detailed planning is now in progress with key stakeholders and partners to fully impact any risks to the high level delivery plan dates.","startDate":"2020-07-01","endDate":"2030-03-31","scheduleNarrative":"Your project end-date is 31 MAR 2030. This is primarily due to the following factors: The Programme is currently being delivered over two phases. Phase one is in delivery and governed with funding allocated until 24/25. Phase two design is currently under development and will progress via established governance processes to confirm and agree funding allocations as part of the next Spending Review.","fyBaseline":8.4,"fyForecast":10.93,"fyVariance":30.0,"varianceNarrative":"The 21/22 baseline is based on the Programme Business Case. The 21/22 forecasts reflects a departmental authorised spend in 2021 in line with the aims and objectives of the Programme Business Case which included improvements to floorplate design and Microsoft Teams enabled meeting rooms .","wholeLifeCost":862.0,"costNarrative":"Your projects Baseline Whole Life Cost is 862.30 (£m). This is primarily due to the following factors: The department will use lease break opportunities in 2023 and 2028 to transform and right-size the estate, with targeted investment based on length of building tenure, making the overall estate smaller. Those sites we intend to exit in 2028, will be subject to an absolute minimum spend, driven by the results of individual Building Assessment Reports. Sites with a longer term strategic future, retained beyond 2028 and capable of meeting greening government targets, will be upgraded to meet the standards of other modern DWP buildings.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 is Amber. This is primarily due to the following factors: We are in year one of a ten year programme. The Programme Business Case was approved at the end of March 2022 and detailed planning is now in progress with key stakeholders and partners to fully impact any risks…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"DWP_0013_2122-Q2","year":2023,"name":"Workplace Transformation","department":"DWP","category":"Government Transformation and Service Delivery","description":"The Workplace Transformation Programme is a 10-year programme which focuses on how and where we will work, determining our future locations and working practices. This will deliver efficiencies and enable genuine modernisation and transformation within DWP. Alongside this there is a structured programme of essential works to ensure our ageing buildings remain safe and functional for claimants and colleagues delivered through our Estate function. Together they support the Government's Property Strategy to deliver a smaller, better, and greener estate and the Places for Growth objectives - making DWP a great place to work and improving the customer experience.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"","startDate":"2020-07-01","endDate":"2030-03-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2030-03-31. This is primarily due to the following factors. WPT is complex, as an enabling Programme it has a number of key dependencies including future size of the workforce, how that workforce is deployed, and the underpinning ways services are delivered (the operating model) during modernisation/transformation. However, the programme has a burning platform for future location strategy delivery due to lease events in 2028 which will need to drive decision-making for the next phase.PBCv2.0 for 23-24 funding is due for HMT approval in May 2023. PBCv3.0 timeline is in development. PBCv3.0 will seek funding for the remainder of this SR, 24-25 and across the next.To date, the Programme has achieved a majority of Deliverables while actively managing the few where delivery slipped due to external influences.Planned building closures, consolidations and refurbishments proceed to plan. The 'retain, re-train, re-deploy' strategy has resulted in lower people exit costs than forecasted.The phased approach for Temporary Jobcentres closure commenced as planned, the Programme taking advantage of where early lease-breaks present.","fyBaseline":250.6,"fyForecast":82.15,"fyVariance":-67.0,"varianceNarrative":"The baseline uses the Programme Business case (PBC) set in March 22 which aligned to the site level strategy at that point. This baseline is therefore over one year old. Since then, the site level strategy has been subject to change following feasibility stages and deep dives. The outturn for 22/23 was 168.5m below the original PBC baseline, this was due to a number of factors, including the impacts of IFRS16 accounting treatment, lower than anticipated number of people exits, absorption of training costs within existing allocations, building costs per square metre being lower than original estimates and pausing of activity on sites not demonstrating value for money. Additionally, to ensure successful delivery of benefits enabled by site closures, some improvement work has been reprofiled into the remaining years of the SR. Despite the lower outturn the realisation of benefits remains on track with no impact to successful delivery of the programme. To improve the cost management of the programme in future years we have undertaken additional scrutiny of the delivery plans and assumptions, as well as strengthening financial reporting processes.","wholeLifeCost":862.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 remained at 862m. This is primarily due to the following factors. The actual spend figure above, reflects the first delivery year 22-23 of WTP although the Baselined Whole Life Cost figure, reflects the latest approved Programme Business Case (v1), approved for 22-23. The revised Whole Life Cost figure will be updated alongside PBCv2, including the impacts of IFRS16 (lease accounting), which will be included in the Q1 GMPP report.","benefits":3536.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 3536m. By right-sizing, the estates baseline can be reduced by 80m-90m per year from 2028/29. Subject to future funding ultimately deliver substantial gross savings of 3,536m (inc. Vat and inflation, exclude depreciation) over a standard 30-year estate business case period.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2030-03-31. This is primarily due to the following factors. WPT is complex, as an enabling Programme it has a number of key dependencies including future size of the workforce, how that workforce is deployed, and the underpinning ways services are…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"DWP_0013_2122-Q2","year":2024,"name":"Workplace Transformation","department":"DWP","category":"Government Transformation and Service Delivery","description":"The Workplace Transformation Programme (WTP) is a 10-year programme focusing on future locations and working practices. Investment will deliver flexible, affordable and inclusive workplaces through a smaller, better and greener estate, delivering efficiencies and enabling genuine modernisation and transformation within DWP. WTP sits alongside a schedule of essential works delivered through our Estates function ensuring our ageing buildings remain safe and functional for claimants and colleagues. This supports the Government's Property Strategy and Places for Growth objectives - making DWP a great place to work. WTP will also invest in our ways of working, changing the way our people use buildings and delivering on the Department's obligations to embed Smarter Working and PAS 3000 standards. WTP requires significant capital investment but delivers significant financial savings as well as wider social benefits each following year, consolidating and improving our workplace with a direct positive impact on customer experience and outcomes.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. The latest IPA RAG rating is Amber. All the recommendations from the last IPA review have been actioned and closure of these were approved by Programme Board. The rating recognises the transformation journey the department is on - with a dependency on other transformation programmes and the department's evolving departmental operating model in terms of understanding the size of the estate, particularly beyond 2030.These are out with the programme's control, although strong relationships have been built with those, including roles within our governance and a delivery plan has been developed to make sure progress in the shorter term can be made.","startDate":"2020-07-01","endDate":"2030-03-31","scheduleNarrative":"The project's end-date at 23/24-Q4 is 2030-03-31. This is primarily due to the following factors. WTP is a complex Programme with a number of key dependencies including future size and deployment of the workforce and the future operating model. WTP achieved the majority of planned deliverables to 'right size' and improve the quality of the estate in 23/24 actively managing the few where delivery slipped due to external influences. Deliverables achieved included: . closure of selected sites . site investment work to improve building standards . reduce redundant space based on occupancy levels . Feasibility work to inform future investment levels The People Strategy supporting WTP, to 'retain, retrain and redeploy' colleagues was successfully implemented, resulting in lower people exit costs than forecasted with no compulsory redundancies. Four Cabinet Office Places for Growth targets were met or exceeded ahead of 2025 deadlines, including relocating DWP roles from London. WTP are now developing its future plans aligned to the next Spending Review and scheduled lease expiry dates in 2028.","fyBaseline":172.83,"fyForecast":133.72,"fyVariance":-23.0,"varianceNarrative":"The budget variance exceeds 5%. The financial Year 2324 outturn reflects changes since the completion of Programme Business Case 2 (PBC2 May 23), resulting in c39m lower outturn than PBC2. This is mainly due to the impact of changes to latest site delivery plans following feasibility studies and a series of deep dive scrutiny sessions which have informed cost assumptions versus those used in PBC2. Some projects have been aborted whilst there are others that have been included in the latest outturn that were approved after the PBC2 was submitted. _x000D_ The outturn also reflects lower people costs associated with building consolidations and closures. Further variances relate to Programme resources, where recruitment plans were lower than original PBC2. _x000D_ Internal budget allocations were revised to c153m during 23/24 to reflect some of known changes described above. Further movement within the programme has resulted in an underspend against budget of c19m (Budget c153m v Outturn c134m - Var c19m).","wholeLifeCost":830.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 decreased from 862m. to 830m. This is primarily due to the following factors. 2223 Q4 whole life baseline was based on Programme Business Case (PBC1) signed off by HMT in March 22 with whole life baseline costs at 862.3m. This has since been revised at Q3 to reflect historic actual costs for FY21/22 and FY22/23 and the approved PBC2 for FY23/24 onwards. The revised whole life baseline costs are 829.79m, a decrease of 33m since PBC1. This is a net cost reduction due to changes in some assumptions from original PBC1.","benefits":2969.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 2969m.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Approvals & decisions"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. The latest IPA RAG rating is Amber. All the recommendations from the last IPA review have been actioned and closure of these were approved by Programme Board. The rating recognises the transformation journey the…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"DWP_0013_2122-Q2","year":2025,"name":"Workplace Transformation","department":"DWP","category":"Government Transformation and Service Delivery","description":"The Workplace Transformation Programme (WTP) is a 10-year programme to support the change to the Department’s operating model, consolidate the estate to the right size and shape and provide more flexible, efficient and better-quality sustainable buildings in alignment with the Government’s greening commitments, Places for Growth, levelling up the economy and building back better. Throughout the transformation, WTP remains committed to proactively support colleagues and customers through this period of change. WTP is working with other Programmes to modernise the services underpinning the DWP ambition of becoming a simpler, cheaper, and more efficient organisation, enabling our people to deliver quality outcomes; reflecting citizens’ and the Modern Civil Service’s needs: enhancing lives; enabling success; and ensuring value. WTP will deliver far more than a smaller, better, and greener estate modernisation. It will fundamentally reshape our support to customers, how we work, where we work and when we work, helping to make DWP a great place to work. It will also change the way people work through investing in new ways of working, changing the way staff use buildings by more flexible ways of working and to deliver on the Department’s obligations to fully embed Smarter Working and PAS 3000 standards and supporting the shift towards the delivery of digital services. WTP requires significant capital investment but delivers significant financial and social benefits each delivery year by consolidating and improving our workplace with a direct positive impact on customer experience and outcomes throughout the programme’s lifecycle.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The IPA review carried out during September 2024, assessed the Programme as Amber indicating that while there are significant challenges, the Programme is feasible and achievable. The Programme has almost completed its action plan to address the recommendations made, with just one remaining action due to be concluded by the end of July 2025. The rating recognises the transformation journey the department is on – with a dependency on other transformation programmes and the department’s evolving departmental operating model in terms of understanding the size of the estate, particularly beyond 2030. These are out with the programme’s control, although strong relationships have been built with those programmes.","startDate":"2020-07-01","endDate":"2030-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2030. This is primarily due to the following factors‚ WTP is complex, and as an enabling Programme it has a number of key dependencies including future size of the workforce, how that workforce is deployed, and the underpinning ways services are delivered (the operating model) during modernisation/transformation. The second iteration of the Programme Business Case (PBC) was approved by HMT in October 2023 with a third iteration currently with HMT awaiting approval as per annual refresh and iteration processes. The programme has been developing plans for 2025 to 2028, aligning its modelling with its Spending Review bid and scheduled lease expiry events in 2028, across the DWP estate. The Programme achieved its planned deliverables to ‘right size’ and improve the quality of the estate in 24/25. Deliverables achieved included: • Closure of selected ‘Back of House’, Front of House and Temporary Jobcentre sites • Investment work in sites to improve the standard of buildings and increase and improve the provision of Learning Design and Development rooms • Progression of high-profile office moves in London, Blackpool, and Newcastle • Installation of electric car charging points • Provision of cycle storage • Installation of Under Setting Sensors to improve our understanding of space utilisation within sites • Feasibility work to inform future investment and divestment of sites The Programme has been leading on the implementation of 60% In Office Attendance across the Department. Progress has been made to enable this. A Business Change approach has been developed to embed working practices which enable and encourage our colleagues to use our buildings effectively, helping us to; maximise the utilisation of our sites, support the development of inclusive communities, cultures and connections in our offices and deliver return on our investment.","fyBaseline":196.17,"fyForecast":113.45,"fyVariance":42.17,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The HMT approved baseline/departmental baseline is based on PBC2 which was completed in May 2023. Since then, the outturn has been subject to changes and reflects the latest delivery plans. There are a number of reasons for the movement between PBC2 and the 24/25 outturn. Firstly, cost assumptions have been updated since PBC2 to reflect the outcome of feasibility studies, and a series of deep dive scrutiny sessions. Some projects have not progressed whilst there are other projects that have been approved after the PBC2 was submitted. Excess fares in PBC2 have been removed, partly due to reductions in eligibility / take up and the balance being absorbed by the business. Other outturn reductions relate to a lower Programme staff cost as recruitment has not progressed as originally forecast. Enabling functions costs have been revised, along with a reduction in expenditure for Workplace Management Solutions due to the firming up of the preferred option. These movements were offset by dilapidations costs being higher than anticipated due to movement from the previous year as a result of extended negotiations to secure the best value settlement.","wholeLifeCost":3506.7,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 830 to 3506. This is primarily due to the following factors‚ There has been a change to data presentation only. Previously the HMT Approved/Departmental baseline recurrent costs were netted off in the benefits tab, hence benefit tab reflected the net benefits position. For Q4 for presentational purposes only, gross HMT Approved/Departmental baseline recurrent costs of £2,676.9m have been removed from the benefits tab and input under the costs tab (under recurring new costs). The net effect of this movement is nil.","benefits":5645.6,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 2969 to 5645. This is primarily due to the following factors‚ There has been a change to data presentation. Previously the HMT Approved/Departmental baseline recurrent costs were netted off in the benefits tab, hence benefit tab reflected the net benefits position. For Q4 for presentational purposes only, gross HMT Approved/Departmental baseline costs of £2,676.9m have been removed from the benefits tab and input under the costs tab (under recurring new costs). The net effect of this movement is nil.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The IPA review carried out during September 2024, assessed the Programme as Amber indicating that while there are significant challenges, the Programme is feasible…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"DWP_0013_2122-Q2","year":2026,"name":"Workplace Transformation","department":"DWP","category":"Government Transformation and Service Delivery","description":"The Workplace Transformation Programme (WTP) is a 10-year programme to support the change to the Department’s operating model, consolidate the estate to the right size and shape and provide more flexible, efficient and better quality sustainable buildings in alignment with the Government’s greening commitments, Places for Growth, and building back better. Throughout the transformation, WTP remains committed to proactively supporting colleagues and customers through this period of change. WTP is working with other Programmes to modernise the services underpinning the DWP ambition of becoming a simpler, cheaper, and more efficient organisation, enabling our people to deliver quality outcomes; reflecting citizens’ and the Modern Civil Service’s needs: enhancing lives; enabling success; and ensuring value. WTP will deliver far more than a smaller, better and greener estate. It will fundamentally reshape our support to customers, how we work, where we work and when we work, helping to make DWP a great place to work. WTP works closely with colleagues delivering the new jobs and careers service, who are setting out the future operating model to transform the Department’s customer facing presence and better support communities. In our Service and Support Centre estate, where colleagues do not see customers face-to-face, the Department is rightsizing the estate to ensure efficiency by only paying for the space we need. This will lead to fewer, larger, multi-product line buildings, investment in some sites we retain to improve the working environment, and, where it is the most cost-effective solution, acquiring new sites. It will also change the way people work through investing in new ways of working, changing the way staff use buildings by more flexible ways of working and to deliver on the Department’s obligations to fully embed Smarter Working and PAS 3000 standards and supporting the shift towards the delivery of digital services. WTP requires significant capital investment but delivers huge financial and social benefits each following year by consolidating and improving our workplace with a direct positive impact on customer experience and outcomes.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The NISTA review carried out during January 2026 assessed the Programme as Amber indicating that WTP is in a good position to deliver further success. It noted that the Programme is well led and has strong inter-personal relationships with key stakeholders. The SRO has agreed the recommendations detailed in the report and an action plan has been developed. Regular updates will be provided to the boards on progress to address the recommendations. The rating recognises the transformation journey the department is on – with a dependency on other transformation programmes and the department’s evolving departmental operating model in terms of understanding the size of the estate, particularly beyond 2030. This includes a dependency on the DWP Target Operating Model (TOM).","startDate":"2020-07-01","endDate":"2031-03-31","scheduleNarrative":"WTP is complex, and as an enabling Programme it has a number of key dependencies including future size of the workforce, how that workforce is deployed, and the underpinning ways services are delivered (the operating model) during modernisation/transformation. The third iteration of the Programme Business Case (PBC) was approved by HMT in June 2025 with a fourth iteration of the Programme Business Case (PBC4) was approved on the 23/03/26 securing approval for a \"Balanced Approach\" to rationalise the estate into a smaller, more efficient, and sustainable footprint starting from FY2026/27. Deliverables achieved within 25-26 include: · Closure of selected Jobcentres and Service and Support Centres · Decommissioned temporary jobcentres established to support customers during the pandemic. Only one temporary jobcentre remains open to the public and this will be converted to a permanent jobcentre. · Completed investment work in Jobcentre and Service and Support Centre sites to improve the standard of buildings. · Progression of high-profile office moves in London · Moved colleagues into ‘award winning’ Fylde View building in Blackpool, contributing to wider local authority plans to regenerate the town centre. · Started construction of new Newcastle hub - due for completion in 2027. · Installation of 255 electric car charging points at over 100 DWP sites saving over 199.76 tonnes of CO2 to date. · Repaired or installed cycle racks at 94 sites. · Installation of Under Setting Sensors to improve our understanding of space utilisation within sites. · Feasibility work to inform future investment and divestment of sites · Launched a lift share app at five pilot sites, reducing travel costs and carbon impacts by facilitating shared commutes to the office. · Led on the implementation of 60% In Office Attendance across the Department.","fyBaseline":532.06,"fyForecast":520.95,"fyVariance":2.09,"varianceNarrative":"The budget variance is less than 5%.","wholeLifeCost":3367.17,"costNarrative":"Compared to financial year 24/25-Q4, the programme’s departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) at £3367.17m. This increase is primarily due to the following factors: The transition from Programme Business Case (PBC2) to the departmentally approved Programme Business case (PBC4). PBC2 focused on Spending Review (SR21) delivery, largely targeting specific projects. PBC4 incorporates more detailed delivery planning for SR25 onwards. Key drivers include: • Revised assumptions following detailed delivery planning for SR25 including changes in the strategy for the number of sites. Previous PBC2 assumptions were based on SR21 hence less refined for future years. • More complex and higher cost projects compared to earlier network design activity. • Updated people impact costs reflecting lease end positions, alternative options, and ministerial decisions. • Updated cost modelling assumptions aligned to current industry benchmarks and construction inflation. • In PBC4 we have reclassified the IFRS 16 (International Financial Reporting Standards) impacts which are no longer part of the financial case cash position based on NISTA (National Infrastructure and Service Transformation Authority) advice","benefits":3938.0,"benefitsNarrative":"Compared to financial year 24/25-Q4, the programme’s departmentally agreed Whole Life Benefits at 25/26-Q4 (measured in £m) decreased to £3938m. This decrease is primarily due to the following factors: • The transition from Programme Business Case (PBC2) to the departmentally approved Programme Business Case (PBC4). PBC2 focused on Spending Review (SR21) delivery, largely targeting specific projects. PBC4 incorporates more detailed delivery planning for SR25 onwards. • Updated assumptions and delivery timelines led to revisions in projected benefits, aligned to the latest cost and phasing data. • In PBC4 we have reclassified the IFRS 16 (International Financial Reporting Standards) impacts which are no longer part of the financial case cash position based on NISTA (National Infrastructure and Service Transformation Authority) advice.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"The NISTA review carried out during January 2026 assessed the Programme as Amber indicating that WTP is in a good position to deliver further success. It noted that the Programme is well led and has strong inter-personal relationships with key stakeholders. The SRO has agreed the recommendations detailed in the report and an action plan has been developed.…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"DWP_0013_2122-Q2","year":2025,"name":"Workplace Transformation","department":"DWP","category":"Government Transformation and Service Delivery","description":"The Workplace Transformation Programme (WTP) is a 10-year programme to support the change to the Department’s operating model, consolidate the estate to the right size and shape and provide more flexible, efficient and better-quality sustainable buildings in alignment with the Government’s greening commitments, Places for Growth, levelling up the economy and building back better. Throughout the transformation, WTP remains committed to proactively support colleagues and customers through this period of change. WTP is working with other Programmes to modernise the services underpinning the DWP ambition of becoming a simpler, cheaper, and more efficient organisation, enabling our people to deliver quality outcomes; reflecting citizens’ and the Modern Civil Service’s needs: enhancing lives; enabling success; and ensuring value. WTP will deliver far more than a smaller, better, and greener estate modernisation. It will fundamentally reshape our support to customers, how we work, where we work and when we work, helping to make DWP a great place to work. It will also change the way people work through investing in new ways of working, changing the way staff use buildings by more flexible ways of working and to deliver on the Department’s obligations to fully embed Smarter Working and PAS 3000 standards and supporting the shift towards the delivery of digital services. WTP requires significant capital investment but delivers significant financial and social benefits each delivery year by consolidating and improving our workplace with a direct positive impact on customer experience and outcomes throughout the programme’s lifecycle.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The IPA review carried out during September 2024, assessed the Programme as Amber indicating that while there are significant challenges, the Programme is feasible and achievable. The Programme has almost completed its action plan to address the recommendations made, with just one remaining action due to be concluded by the end of July 2025. The rating recognises the transformation journey the department is on – with a dependency on other transformation programmes and the department’s evolving departmental operating model in terms of understanding the size of the estate, particularly beyond 2030. These are out with the programme’s control, although strong relationships have been built with those programmes.","startDate":"2020-07-01","endDate":"2030-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2030. This is primarily due to the following factors‚ WTP is complex, and as an enabling Programme it has a number of key dependencies including future size of the workforce, how that workforce is deployed, and the underpinning ways services are delivered (the operating model) during modernisation/transformation. The second iteration of the Programme Business Case (PBC) was approved by HMT in October 2023 with a third iteration currently with HMT awaiting approval as per annual refresh and iteration processes. The programme has been developing plans for 2025 to 2028, aligning its modelling with its Spending Review bid and scheduled lease expiry events in 2028, across the DWP estate. The Programme achieved its planned deliverables to ‘right size’ and improve the quality of the estate in 24/25. Deliverables achieved included: • Closure of selected ‘Back of House’, Front of House and Temporary Jobcentre sites • Investment work in sites to improve the standard of buildings and increase and improve the provision of Learning Design and Development rooms • Progression of high-profile office moves in London, Blackpool, and Newcastle • Installation of electric car charging points • Provision of cycle storage • Installation of Under Setting Sensors to improve our understanding of space utilisation within sites • Feasibility work to inform future investment and divestment of sites The Programme has been leading on the implementation of 60% In Office Attendance across the Department. Progress has been made to enable this. A Business Change approach has been developed to embed working practices which enable and encourage our colleagues to use our buildings effectively, helping us to; maximise the utilisation of our sites, support the development of inclusive communities, cultures and connections in our offices and deliver return on our investment.","fyBaseline":196.17,"fyForecast":113.45,"fyVariance":42.17,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The HMT approved baseline/departmental baseline is based on PBC2 which was completed in May 2023. Since then, the outturn has been subject to changes and reflects the latest delivery plans. There are a number of reasons for the movement between PBC2 and the 24/25 outturn. Firstly, cost assumptions have been updated since PBC2 to reflect the outcome of feasibility studies, and a series of deep dive scrutiny sessions. Some projects have not progressed whilst there are other projects that have been approved after the PBC2 was submitted. Excess fares in PBC2 have been removed, partly due to reductions in eligibility / take up and the balance being absorbed by the business. Other outturn reductions relate to a lower Programme staff cost as recruitment has not progressed as originally forecast. Enabling functions costs have been revised, along with a reduction in expenditure for Workplace Management Solutions due to the firming up of the preferred option. These movements were offset by dilapidations costs being higher than anticipated due to movement from the previous year as a result of extended negotiations to secure the best value settlement.","wholeLifeCost":3506.7,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 830 to 3506. This is primarily due to the following factors‚ There has been a change to data presentation only. Previously the HMT Approved/Departmental baseline recurrent costs were netted off in the benefits tab, hence benefit tab reflected the net benefits position. For Q4 for presentational purposes only, gross HMT Approved/Departmental baseline recurrent costs of £2,676.9m have been removed from the benefits tab and input under the costs tab (under recurring new costs). The net effect of this movement is nil.","benefits":5645.6,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 2969 to 5645. This is primarily due to the following factors‚ There has been a change to data presentation. Previously the HMT Approved/Departmental baseline recurrent costs were netted off in the benefits tab, hence benefit tab reflected the net benefits position. For Q4 for presentational purposes only, gross HMT Approved/Departmental baseline costs of £2,676.9m have been removed from the benefits tab and input under the costs tab (under recurring new costs). The net effect of this movement is nil.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The IPA review carried out during September 2024, assessed the Programme as Amber indicating that while there are significant challenges, the Programme is feasible…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":365,"attentionScore":38,"attentionReasons":["Current published delivery confidence is Amber","Published end date moved 365 days later"]},{"id":"MOJ_0057_2122-Q1","year":2026,"name":"Rapid Deployment Cells Project","department":"MOJ","category":"Infrastructure and Construction","description":"The Rapid Deployment Cells Programme supports our 20,000 additional prison places commitment; its scope is to offer a flexible capacity solution across the prison estate.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25-Q4, the NISTA Delivery Confidence Assessment rating at 25/26-Q4 remains at Amber. This is primarily due to delays arising following the administration of a key supplier and challenging site conditions.​","startDate":"2021-07-27","endDate":"2028-07-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end date at 25/26-Q4 changed from 28/02/28 to 31/07/2028. This is primarily due to schedule slippage across multiple sites.","fyBaseline":147.57,"fyForecast":105.0,"fyVariance":28.85,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to delays following supplier entering administration and challenging site conditions, requiring some costs to be re-profiled into future financial years.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"This programme currently reports no monetised benefits. Due to the projected increasing prisons population, this programme focusses on increasing capacity and there are no monetised benefits to be claimed. The programme's other benefits are defined in the current baseline as: construction benefits and outcomes (capacity, modern methods of construction and sustainability); to enable an improvement in prisoner rehabilitation outcomes; and, during its construction, to deliver local community benefits.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 24/25-Q4, the NISTA Delivery Confidence Assessment rating at 25/26-Q4 remains at Amber. This is primarily due to delays arising following the administration of a key supplier and challenging site conditions.​ Compared to financial year 24/25-Q4, the project's end date at 25/26-Q4 changed from 28/02/28 to 31/07/2028. This is…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"MOJ_0057_2122-Q1","year":2022,"name":"Rapid Deployment Cells Project","department":"MOJ","category":"Infrastructure and Construction","description":"RDCP offers a flexible short-term capacity solution across the prison estate. It is designed to provide a significant number of spaces and to be delivered at pre-determined sites by December 2022. The units are a temporary measure to help manage the population demand.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 is Red. This is the first time data has been published for this project, which has been added to GMPP over the last year. The DCA at 21/22-Q4 is Red primarily due to the following factors: Following significant inflation in the UK construction market expected costs are higher than previously estimated, as a result the project is evaluating a variety of delivery options to ensure value for money and improved to 'amber' delivery confidence for the next reporting quarter","startDate":"2020-08-17","endDate":"2024-03-01","scheduleNarrative":"Your project end-date is 01 MAR 2024. This is primarily due to the following factors: The project end date is scheduled as March 2024.","fyBaseline":5.0,"fyForecast":5.0,"fyVariance":0.0,"varianceNarrative":"The in year variance is below or equal to 5% so narrative is required.","wholeLifeCost":244.0,"costNarrative":"Your projects Baseline Whole Life Cost is 243.50 (£m). This is primarily due to the following factors: The project is currently awaiting Full Business Case approval. The costs of the project included in this case reflect changes in the costs driven, in part, by inflation rises, as well as a better understanding of the requirement.","benefits":null,"benefitsNarrative":"","themes":["Commercial & supply chain","Delivery & schedule","Approvals & decisions","Cost & funding"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 is Red. This is the first time data has been published for this project, which has been added to GMPP over the last year. The DCA at 21/22-Q4 is Red primarily due to the following factors: Following significant inflation in the UK construction market expected costs are…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"MOJ_0057_2122-Q1","year":2023,"name":"Rapid Deployment Cells Project","department":"MOJ","category":"Infrastructure and Construction","description":"Rapid Deployment Cells offers a flexible capacity solution across the prison estate. The project is designed to provide a significant number of spaces at pre-determined sites.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 increased from Red (SRO rating) to Amber (IPA rating). This is primarily due to the following factors. Compared to21/22 Q4, theproject'sDelivery Confidence Assessment has improved from Red to Amber.TheAmber assessment is due to planning permission delays, changes tobuilding regulations and challenges in sourcing sufficient utilities to support sites.The project is managing the cost challenges that drove the Red rating last year and developed a business case that consolidates the two phases of the project into a single programme in two phases. One site has fully delivered.","startDate":"2020-08-17","endDate":null,"scheduleNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","fyBaseline":104.06,"fyForecast":99.06,"fyVariance":-5.0,"varianceNarrative":"Variance is less than 5%, so no narrative required","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This project currently reports no monetised benefits. Due to the projected increasing prisons population, this project focusses on increasing capacity and there are no monetised benefits to be claimed. The programme's other benefits are defined in the current baseline as: construction benefits and outcomes (capacity, modern methods of construction and sustainability); to enable an improvement in prisoner rehabilitation outcomes; and, during its construction, deliver local community benefits.","themes":["Commercial & supply chain","Cost & funding","Approvals & decisions","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 increased from Red (SRO rating) to Amber (IPA rating). This is primarily due to the following factors. Compared to21/22 Q4, theproject'sDelivery Confidence Assessment has improved from Red to Amber.TheAmber assessment is due to planning permission delays, changes…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"MOJ_0057_2122-Q1","year":2024,"name":"Rapid Deployment Cells Project","department":"MOJ","category":"Infrastructure and Construction","description":"The Rapid Deployment Cells Programme supports our 20,000 additional prison places commitment; its scope is to offer a flexible capacity solution across the prison estate.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. Delays to the delivery of Tranche 2 sites mainly driven by planning permission delays and challenging site conditions. Twelve sites have been fully delivered.","startDate":"2020-08-17","endDate":null,"scheduleNarrative":"Exempt under Section 22 of the Freedom of Information Act 2000 (Information intended for future publication)","fyBaseline":129.59,"fyForecast":147.45,"fyVariance":14.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The overspend is due to increased construction costs due to inflation following planning permission delays and challenging site conditions.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":0.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 0m. This project currently reports no monetised benefits. Due to the projected increasing prisons population, this project focusses on increasing capacity and there are no monetised benefits to be claimed.","themes":["Commercial & supply chain","Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. Delays to the delivery of Tranche 2 sites mainly driven by planning permission delays and challenging site conditions. Twelve sites have been fully delivered. Exempt…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"MOJ_0057_2122-Q1","year":2025,"name":"Rapid Deployment Cells Project","department":"MoJ","category":"Infrastructure and Construction","description":"The Rapid Deployment Cells Programme supports our 20,000 additional prison places commitment; its scope is to offer a flexible capacity solution across the prison estate.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at Amber. This is primarily due to the following factors… Delays following supplier entering administration and challenging site conditions.","startDate":"2020-08-17","endDate":"2028-02-28","scheduleNarrative":"The project's end-date at 24/25-Q4 is scheduled to be 28/02/2028. This is primarily due to the following factors‚ Delays following supplier entering administration and challenging site conditions.","fyBaseline":322.43,"fyForecast":87.77,"fyVariance":72.78,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ This is due to delays following supplier entering administration and challenging site conditions, requiring some costs to be re-profiled into future financial years.","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ This project currently reports no monetised benefits. Due to the projected increasing prisons population, this project focusses on increasing capacity and there are no monetised benefits to be claimed. The programme's other benefits are defined in the current baseline as: construction benefits and outcomes (capacity, modern methods of construction and sustainability); to enable an improvement in prisoner rehabilitation outcomes; and, during its construction, deliver local community benefits.","themes":["Commercial & supply chain","Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at Amber. This is primarily due to the following factors… Delays following supplier entering administration and challenging site conditions. The project's end-date at 24/25-Q4 is scheduled to be 28/02/2028. This is primarily…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"MOJ_0057_2122-Q1","year":2026,"name":"Rapid Deployment Cells Project","department":"MOJ","category":"Infrastructure and Construction","description":"The Rapid Deployment Cells Programme supports our 20,000 additional prison places commitment; its scope is to offer a flexible capacity solution across the prison estate.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25-Q4, the NISTA Delivery Confidence Assessment rating at 25/26-Q4 remains at Amber. This is primarily due to delays arising following the administration of a key supplier and challenging site conditions.​","startDate":"2021-07-27","endDate":"2028-07-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end date at 25/26-Q4 changed from 28/02/28 to 31/07/2028. This is primarily due to schedule slippage across multiple sites.","fyBaseline":147.57,"fyForecast":105.0,"fyVariance":28.85,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to delays following supplier entering administration and challenging site conditions, requiring some costs to be re-profiled into future financial years.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"This programme currently reports no monetised benefits. Due to the projected increasing prisons population, this programme focusses on increasing capacity and there are no monetised benefits to be claimed. The programme's other benefits are defined in the current baseline as: construction benefits and outcomes (capacity, modern methods of construction and sustainability); to enable an improvement in prisoner rehabilitation outcomes; and, during its construction, to deliver local community benefits.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 24/25-Q4, the NISTA Delivery Confidence Assessment rating at 25/26-Q4 remains at Amber. This is primarily due to delays arising following the administration of a key supplier and challenging site conditions.​ Compared to financial year 24/25-Q4, the project's end date at 25/26-Q4 changed from 28/02/28 to 31/07/2028. This is…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"MOJ_0057_2122-Q1","year":2025,"name":"Rapid Deployment Cells Project","department":"MoJ","category":"Infrastructure and Construction","description":"The Rapid Deployment Cells Programme supports our 20,000 additional prison places commitment; its scope is to offer a flexible capacity solution across the prison estate.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at Amber. This is primarily due to the following factors… Delays following supplier entering administration and challenging site conditions.","startDate":"2020-08-17","endDate":"2028-02-28","scheduleNarrative":"The project's end-date at 24/25-Q4 is scheduled to be 28/02/2028. This is primarily due to the following factors‚ Delays following supplier entering administration and challenging site conditions.","fyBaseline":322.43,"fyForecast":87.77,"fyVariance":72.78,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ This is due to delays following supplier entering administration and challenging site conditions, requiring some costs to be re-profiled into future financial years.","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ This project currently reports no monetised benefits. Due to the projected increasing prisons population, this project focusses on increasing capacity and there are no monetised benefits to be claimed. The programme's other benefits are defined in the current baseline as: construction benefits and outcomes (capacity, modern methods of construction and sustainability); to enable an improvement in prisoner rehabilitation outcomes; and, during its construction, deliver local community benefits.","themes":["Commercial & supply chain","Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at Amber. This is primarily due to the following factors… Delays following supplier entering administration and challenging site conditions. The project's end-date at 24/25-Q4 is scheduled to be 28/02/2028. This is primarily…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":154,"attentionScore":37,"attentionReasons":["Current published delivery confidence is Amber","Published end date moved 154 days later","In-year forecast variance is +28.9%"]},{"id":"MOD_0122_2021-Q4","year":2026,"name":"FUTURE COMBAT AIR SYSTEM","department":"MOD","category":"Military Capability","description":"The Future Combat Air System (FCAS) programme will identify the combat air system to replace Typhoon, which will retire from service from the mid-2030s. FCAS will be primarily responsible for delivering Control of the Air, and contribute to Attack and Information, Surveillance and Reconnaissance. Military advantage in Combat Air will require a System of highly adaptable and networked capabilities, that together deliver military effects greater than the sum of the parts. Able to operate inside a multi-domain information environment or in isolation, the system will exploit open mission architectures to allow freedom of modification and rapid technology insertion. The System will be enabled through a combination of core platforms, uncrewed additives and complex weapons with the optimal force mix to be determined during the Concept and Assessment Phase. An international programme by design, the UK is working with several international partners to define the longer-term partnership construct for the Enterprise.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Red. This is primarily due to the following factors. 1. The continued Red rating reflects the programme’s relative maturity, its scale and the complexity involved in meeting the challenges of successful design, delivery and support of a 6th generation fighter jet. The immediate focus is securing the necessary multi-year funding and approval settlements that will allow the Global Combat Air Programme (GCAP) to move to the next phase and see the first international development contract between the GCAP Agency and the tri-national Edgewing Joint Venture signed. 2. Other challenges faced by the programme include the design and delivery of a tri-national secure digital network and Collaborative Working Environment that equally supports novel approaches to digital engineering and digital qualification and certification objectives, whilst ensuring cyber resiliency and intellectual property protections.","startDate":"2019-04-26","endDate":null,"scheduleNarrative":"Exempt under Section 22 - Information intended for future publication","fyBaseline":1466.97,"fyForecast":1398.74,"fyVariance":4.65,"varianceNarrative":"The budget variance is less than 5%.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Technical & integration","Cost & funding","Delivery & schedule","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Red. This is primarily due to the following factors. 1. The continued Red rating reflects the programme’s relative maturity, its scale and the complexity involved in meeting the challenges of successful design, delivery and support of a 6th…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"MOD_0122_2021-Q4","year":2021,"name":"Future Combat Air System","department":"MOD","category":"Military Capability","description":"Future Combat Air will play a vital role in the United Kingdom's military strategic capabilities for decades to come, enabling us to defend the United Kingdom, our allies, and make a decisive contribution to global security. The Future Combat Air Systems Programme will design and deliver innovative systems of highly networked crewed and uncrewed air vehicles, sensors and effectors to be able to operate in a range of complex and evolving threat environments and preserve operational advantage for future decades.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber/red.This is primarily due to the following factors: Through the Integrated Review of Security, Defence, Development and Foreign Policy the Future Combat Air System received investment for the first 4-years to complete the Concept and Assessment Phase. A phase that will complete an Alternative System Review of the Future Combat Air System including the Core Platform, as well as establishing the international partnerships. The level of investment was significantly less than required, however it preserves the feasibility of the programme within current parameters, but adds significant overall programme risk, particularly to the assumed date for Initial Operating Capability. The Concept and Assessment Phase will provide the evidence for Programme viability including level of additional investment and/or other options for the provision of Combat Air. Investments and milestones beyond this phase are subject to a margin of error in terms of time, cost and performance that will be refined prior to the next decision gate.","startDate":"2019-04-26","endDate":"2070-12-31","scheduleNarrative":"The project end-date is 31 December 2070. This is primarily due to the following factors: To support an Outline Business Case submission to the Investment Approvals Committee, a detailed schedule to support the 4-year Concept and Assessment phase of the programme was completed. This was based on a UK investment of �1.65Bn over the 4 years in line with the Future Combat Air System Acquisition Programme proposition in the Integrated Review of Security, Defence, Development and Foreign Policy. Through Annual Budgeting Cycle 21 the UK funding has been capped at �1.2Bn. Whilst a full review of the schedule to the next decision gate is required, it is not envisaged that this reduction will have significant impact on meeting the critical milestones for the Concept and Assessment Phase. However, it significantly increases the Programme Risk in the next phase to Full Business Case and further pressure through Annual Budgeting Cycle 21 on the 10-year profile increases the risk to Initial Operating Capability. This will need to be tested at the next decision gate, when other factors including international investment; levels of transformation and requirements are better understood.","fyBaseline":5.39,"fyForecast":5.27,"fyVariance":-2.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":9467.0,"costNarrative":"The projects Baseline Whole Life Cost is �9467.00m. This is primarily due to the following factors: This is baseline funding allocated to the Programme as of 31 March 2021. It is not the anticipated Whole Life Costs of the Programme which is �72b","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Approvals & decisions","Governance & assurance","Delivery & schedule"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber/red.This is primarily due to the following factors: Through the Integrated Review of Security, Defence, Development and Foreign Policy the Future Combat Air System received investment for the first 4-years to complete the Concept and Assessment Phase. A phase that will…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21"},{"id":"MOD_0122_2021-Q4","year":2022,"name":"Future Combat Air System","department":"MOD","category":"Military Capability","description":"Future Combat Air will play a vital role in the United Kingdom's military strategic capabilities for decades to come, enabling us to defend the United Kingdom, our allies, and make a decisive contribution to global security. The Future Combat Air Systems Programme will design and deliver innovative systems of highly networked crewed and uncrewed air vehicles, sensors and effectors to be able to operate in a range of complex and evolving threat environments and preserve operational advantage for future decades.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating increased from Amber/Red to Amber. This is primarily due to the following factors: The removal of the incremental Amber/Red and Amber/Green assessment ratings. The programme is in the Concept and Assessment Phase which will provide the evidence for Programme viability including the level of additional investment and/or other options for the provision of Combat Air ahead of submitting the Outline Business Case 2 in October 24.","startDate":"2019-04-26","endDate":"2070-12-31","scheduleNarrative":"Compared to 2021-Q4, the project end-date remained scheduled to finish on 31 December 70.","fyBaseline":77.3,"fyForecast":78.33,"fyVariance":0.0,"varianceNarrative":"The budget variance is inferior or equal to 5%.","wholeLifeCost":10687.0,"costNarrative":"Compared to 2021-Q4, the projects Baseline Whole Life Cost has increased by £10677.30M (£9.467M at Q4 20/21 and £10686.767M at Q4 21/22). This is primarily due to the following factors: At Q4 20/21 the project only had SOC approval and was awaiting approval of the Outline Business Case 1 that provided the Approved Budgetary Level for the 4-year Concept and Assessment Phase (£1.2Bn). Further provision has been provided over the remaining years of the Annual Budget Cycle period, the actual costs and funding required to be confirmed in the Outline Business Case 2 in October 24.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Approvals & decisions","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating increased from Amber/Red to Amber. This is primarily due to the following factors: The removal of the incremental Amber/Red and Amber/Green assessment ratings. The programme is in the Concept and Assessment Phase which will provide the evidence…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"MOD_0122_2021-Q4","year":2023,"name":"Future Combat Air System","department":"MOD","category":"Military Capability","description":"The Future Combat Air System Acquisition Programme will identify the combat air system to replace Typhoon. The Future Combat Air System will be primarily responsible for delivering Control of the Air, and contribute to Attack and Information, Surveillance and Reconnaissance. It will be able to operate inside a multi-domain information environment or in isolation. The system will exploit open mission architectures to allow freedom of modification and rapid technology insertion. It will be enabled through a combination of crewed and uncrewed platforms and complex weapons with the optimal force mix to be determined during the Concept and Assessment Phase. An international programme by design, the UK is working with several international partners to define the longer-term partnership construct for the Enterprise","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 decreased from Amber to Red. This is primarily due to the following factors. On-going dependencies impacting the programme from other MOD areas and a shortage of resources impacting skills and capabilities. Other programme areas have remained Amber since Q4 2021 with on-going mitigation in progress. Remedial action for a route to Amber is being implemented but it is expected to take several years to achieve due to the size and complexity of the programme.","startDate":"2019-04-26","endDate":"2070-12-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2070-12-31. This is primarily due to the following factors. NA","fyBaseline":256.94,"fyForecast":247.77,"fyVariance":-4.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":12556.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 increased from 10687m. to 12556m. This is primarily due to the following factors. The inclusion of a budget for FY32/33.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This programme does not report cashable benefits. Its aim is to provision the armed forces with the equipment and / or infrastructure required.","themes":["Cost & funding","Delivery & schedule","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 decreased from Amber to Red. This is primarily due to the following factors. On-going dependencies impacting the programme from other MOD areas and a shortage of resources impacting skills and capabilities. Other programme areas have…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"MOD_0122_2021-Q4","year":2024,"name":"Future Combat Air System","department":"MOD","category":"Military Capability","description":"The Future Combat Air System Acquisition Programme will identify the combat air system to replace Typhoon, which will retire from service from the mid-2030s. FCAS will be primarily responsible for delivering Control of the Air, and contribute to Attack and Information, Surveillance and Reconnaissance. Military advantage in Combat Air will require a System of highly adaptable and networked capabilities, that together deliver military effects greater than the sum of the parts. Able to operate inside a multi-domain information environment or in isolation, the system will exploit open mission architectures to allow freedom of modification and rapid technology insertion. The System will be enabled through a combination of core platforms, uncrewed additives and complex weapons with the optimal force mix to be determined during the Concept and Assessment Phase. An international programme by design, the UK is working with several international partners to define the longer-term partnership construct for the Enterprise","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure and Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Red. This is primarily due to the following factors. This is a reflection of the Programme’s relative maturity, its scale, pace and the complex challenges involved in the successful long-term delivery of a 6th generation fighter jet. The IPA have reported that a RED DCA would be expected at this stage. Significant achievements have already been made, having recently signed a treaty with tri-lateral Global Combat Air Programme (GCAP) partners Italy and Japan in December 2023, but the Programme remains in the early stages of development and we recognise the scale of challenges to stand up a programme of this nature. We are taking actions to address this at the start of the Programme, by learning the lessons of the past and from similarly large and complex projects.","startDate":"2019-04-26","endDate":null,"scheduleNarrative":"Exempt under Section 26 of the Freedom of Information Act 2000 (Defence)","fyBaseline":402.59,"fyForecast":504.05,"fyVariance":25.202,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. MOD approved uplift to maintain pace with the required Trilateral Global Combat Air Programme (GCAP) schedule, especially on Product Definition and critical enabling activity (such as Secure Infrastructure and Digital Infrastructure)’.","wholeLifeCost":null,"costNarrative":"Exempt under Section 26 of the Freedom of Information Act 2000 (Defence)","benefits":0.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 0m.","themes":["Delivery & schedule","Cost & funding","Technical & integration"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure and Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Red. This is primarily due to the following factors. This is a reflection of the Programme’s relative maturity, its scale, pace and the complex challenges involved in the successful long-term delivery of a 6th…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"MOD_0122_2021-Q4","year":2025,"name":"FUTURE COMBAT AIR SYSTEM","department":"MoD","category":"Military Capability","description":"The Future Combat Air System (FCAS) programme will identify the combat air system to replace Typhoon, which will retire from service from the mid-2030s. FCAS will be primarily responsible for delivering Control of the Air, and contribute to Attack and Information, Surveillance and Reconnaissance. Military advantage in Combat Air will require a system of highly adaptable and networked capabilities, that together deliver military effects greater than the sum of the parts. Able to operate inside a multi-domain information environment or in isolation, the system will exploit open mission architectures to allow freedom of modification and rapid technology insertion. The system will be enabled through a combination of core platforms, uncrewed additives and complex weapons, with the optimal force mix to be determined during the Concept and Assessment Phase. An international programme by design, the UK is working with several international partners to define the longer-term partnership construct for the Enterprise.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at RED. This is primarily due to the following factors. This is a reflection of the programme’s relative maturity, its scale, pace and the complex challenges involved in the successful long-term delivery of a 6th generation combat aircraft. As such, a confidence assessment of Red is not unexpected. Significant achievements have been made, having signed a treaty with trilateral Global Combat Air Programme (GCAP) partners Italy and Japan in Dec 2023. Three significant milestones were then achieved in December 2024: the GCAP Convention came into force, the GCAP International Government Organisation was formally established in the UK, and the Joint Venture Agreement for GCAP was trilaterally signed by industry partners. However, the programme remains in the early stages of development, and there is recognition of the scale of the challenges faced to stand up a programme of this nature. Actions are being taken to address this at the start of the programme by learning the lessons of the past and from similarly large and complex projects.","startDate":"2019-04-26","endDate":null,"scheduleNarrative":"Section 22 - Information intended for future publication","fyBaseline":1261.9,"fyForecast":1238.2,"fyVariance":1.88,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Delivery & schedule","Cost & funding","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at RED. This is primarily due to the following factors. This is a reflection of the programme’s relative maturity, its scale, pace and the complex challenges involved in the successful long-term delivery of a 6th generation combat aircraft. As such, a…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"MOD_0122_2021-Q4","year":2026,"name":"FUTURE COMBAT AIR SYSTEM","department":"MOD","category":"Military Capability","description":"The Future Combat Air System (FCAS) programme will identify the combat air system to replace Typhoon, which will retire from service from the mid-2030s. FCAS will be primarily responsible for delivering Control of the Air, and contribute to Attack and Information, Surveillance and Reconnaissance. Military advantage in Combat Air will require a System of highly adaptable and networked capabilities, that together deliver military effects greater than the sum of the parts. Able to operate inside a multi-domain information environment or in isolation, the system will exploit open mission architectures to allow freedom of modification and rapid technology insertion. The System will be enabled through a combination of core platforms, uncrewed additives and complex weapons with the optimal force mix to be determined during the Concept and Assessment Phase. An international programme by design, the UK is working with several international partners to define the longer-term partnership construct for the Enterprise.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Red. This is primarily due to the following factors. 1. The continued Red rating reflects the programme’s relative maturity, its scale and the complexity involved in meeting the challenges of successful design, delivery and support of a 6th generation fighter jet. The immediate focus is securing the necessary multi-year funding and approval settlements that will allow the Global Combat Air Programme (GCAP) to move to the next phase and see the first international development contract between the GCAP Agency and the tri-national Edgewing Joint Venture signed. 2. Other challenges faced by the programme include the design and delivery of a tri-national secure digital network and Collaborative Working Environment that equally supports novel approaches to digital engineering and digital qualification and certification objectives, whilst ensuring cyber resiliency and intellectual property protections.","startDate":"2019-04-26","endDate":null,"scheduleNarrative":"Exempt under Section 22 - Information intended for future publication","fyBaseline":1466.97,"fyForecast":1398.74,"fyVariance":4.65,"varianceNarrative":"The budget variance is less than 5%.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Technical & integration","Cost & funding","Delivery & schedule","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Red. This is primarily due to the following factors. 1. The continued Red rating reflects the programme’s relative maturity, its scale and the complexity involved in meeting the challenges of successful design, delivery and support of a 6th…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"MOD_0122_2021-Q4","year":2025,"name":"FUTURE COMBAT AIR SYSTEM","department":"MoD","category":"Military Capability","description":"The Future Combat Air System (FCAS) programme will identify the combat air system to replace Typhoon, which will retire from service from the mid-2030s. FCAS will be primarily responsible for delivering Control of the Air, and contribute to Attack and Information, Surveillance and Reconnaissance. Military advantage in Combat Air will require a system of highly adaptable and networked capabilities, that together deliver military effects greater than the sum of the parts. Able to operate inside a multi-domain information environment or in isolation, the system will exploit open mission architectures to allow freedom of modification and rapid technology insertion. The system will be enabled through a combination of core platforms, uncrewed additives and complex weapons, with the optimal force mix to be determined during the Concept and Assessment Phase. An international programme by design, the UK is working with several international partners to define the longer-term partnership construct for the Enterprise.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at RED. This is primarily due to the following factors. This is a reflection of the programme’s relative maturity, its scale, pace and the complex challenges involved in the successful long-term delivery of a 6th generation combat aircraft. As such, a confidence assessment of Red is not unexpected. Significant achievements have been made, having signed a treaty with trilateral Global Combat Air Programme (GCAP) partners Italy and Japan in Dec 2023. Three significant milestones were then achieved in December 2024: the GCAP Convention came into force, the GCAP International Government Organisation was formally established in the UK, and the Joint Venture Agreement for GCAP was trilaterally signed by industry partners. However, the programme remains in the early stages of development, and there is recognition of the scale of the challenges faced to stand up a programme of this nature. Actions are being taken to address this at the start of the programme by learning the lessons of the past and from similarly large and complex projects.","startDate":"2019-04-26","endDate":null,"scheduleNarrative":"Section 22 - Information intended for future publication","fyBaseline":1261.9,"fyForecast":1238.2,"fyVariance":1.88,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Delivery & schedule","Cost & funding","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at RED. This is primarily due to the following factors. This is a reflection of the programme’s relative maturity, its scale, pace and the complex challenges involved in the successful long-term delivery of a 6th generation combat aircraft. As such, a…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":null,"attentionScore":35,"attentionReasons":["Current published delivery confidence is Red"]},{"id":"DFT_0040_2021-Q1","year":2026,"name":"HS2 PHASE I","department":"DFT","category":"Infrastructure and Construction","description":"A new high-capacity, high-speed railway connecting London and the West Midlands with onward services to other cities, via the existing West Coast Main Line.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"The NISTA / SRO Delivery Confidence Assessment (DCA) rating remains at RED at 25/26 Q4. This is primarily due to delivery of HS2 being unachievable against Baseline 7.1 (approved at Notice to Proceed in April 2020), as confirmed through correspondence between the HS2 Ltd Chief Executive Officer (CEO) and the Secretary of State in 2025. In response, the Department and HS2 Ltd have progressed a comprehensive reset programme, alongside strengthened governance and delivery controls. Key developments include: • Continuing the HS2 reset under the leadership of CEO Mark Wild and Chair Mike Brown, with Board capability strengthened through new Non-Executive Director appointments. • HS2 Ltd providing assured cost and schedule ranges to the Department, approved by the Ministerial Task Force in January 2026, with further conditions (including the outcome of the Strategic Scope Review) addressed ahead of publication and announcement by the Secretary of State on 19 May 2026. • Commencing development of a new delivery baseline (Baseline 8.0/8.1), supported by a staged review process to ensure robust assurance and programme integration. • Maintaining tight in-year financial and performance controls through the Performance Management Plan (PMP), contributing to improved construction productivity and delivery within annual budgets. • Delivering FY25/26 Phase 1 expenditure and maximising productivity in line with budget (£6.967bn, 0.4% below Supplementary Estimates) and agreeing a £7.1bn funding allocation for FY26/27. • Progressing Euston Programme activities, including definition of an integrated Euston Station Spatial Plan and delivery schedule, the stand-up of the Euston Delivery Company in April 2026, continuation of enabling works and exploration of a private finance delivery model for the HS2 station. Overall, the Department has focused on resetting the programme to establish a credible, deliverable baseline while maintaining cost control, improving productivity, and strengthening governance arrangements.","startDate":"2009-01-14","endDate":null,"scheduleNarrative":"As at 25/26 Q4, the previous delivery into service range of 2029–2033 is unachievable, as confirmed through correspondence between the HS2 Ltd CEO and the Secretary of State in 2025. In response, the Department and HS2 Ltd have progressed a comprehensive reset programme. Key developments include: • The Department has tasked the HS2 Ltd CEO with progressing a comprehensive reset to establish realistic cost and schedule estimates for delivering the remaining scope at the lowest reasonable cost. Assured schedule ranges were provided to the Department in December 2025 and approved by the Ministerial Task Force in January 2026, with further conditions (including the outcome of the Strategic Scope review) addressed ahead of publication and announcement by the Secretary of State on 19 May 2026. • The reset will deliver updated schedule ranges for key service configurations (Old Oak Common–Birmingham, Euston–Birmingham, and Euston–North West) and inform development of a new schedule baseline (Baseline 8.0/8.1). Baseline development commenced in January 2026 and is subject to a progressive integrated review and assurance process. • Whilst the reset is ongoing, the Department continues to manage HS2 Ltd through strengthened in-year controls, including a Performance Management Plan for 2026/27 setting out key milestones, targets and productivity metrics. Enhanced governance and assurance arrangements, aligned to the James Stewart Review, remain in place to support in-year delivery and schedule discipline.","fyBaseline":3489.25,"fyForecast":3489.25,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":null,"costNarrative":"At 25/26 Q4, the departmentally agreed Whole Life Cost (measured in £m) for HS2 is exempted. The Department does not report on Whole Life Cost as it does not reflect the true up-front cost for building HS2. Key developments include: • The Department has tasked the HS2 Ltd CEO with progressing a comprehensive reset to establish realistic cost and schedule estimates for delivering the remaining scope at the lowest reasonable cost. Assured cost ranges were provided to the Department in December 2025 and approved by the Ministerial Task Force in January 2026, with further conditions set ahead of public announcement, including consideration of the Strategic Scope Review. As the Secretary of State publicly announced on 19 May 2026, the expected cost of delivering HS2 is now in the range of £87.7 – £102.7 billion. This is expressed in a mixed price base, including the cash outturn of works to date and the costs of future work excluding inflation. • The HS2 reset is ongoing and work continues to progress on development of a new cost baseline (Baseline 8.0/8.1). Baseline development commenced in January 2026 and is subject to a progressive integrated review and assurance process. • Whilst the reset is ongoing, the Department continues to manage HS2 Ltd through strengthened in-year controls, including a Performance Management Plan for 2026/27 and application of financial controls to support affordability and delivery confidence. • Funding provided through the Spending Review 2025 settlement supports continued delivery between the West Midlands and London Euston, alongside reset activities. Cost control remains focused on improving productivity, strengthening governance, and embedding lessons learned to ensure the programme can be delivered within future agreed budgets.","benefits":null,"benefitsNarrative":"The project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) is exempted. The HS2 programme tracks progress against its benefits baseline through quarterly benefits reporting (QBR). The current reporting on benefits during design and construction is not monetised but uses natural measures to reflect whether the outcomes are achieved. The HS2 programme is currently being reset, and a reset of the programme’s benefits will form part of that programme of work; alongside this, we will update the HS2 business case. In the interim, HS2 Ltd will continue reporting against the existing benefits baseline.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Scope & requirements"],"evidenceExcerpt":"The NISTA / SRO Delivery Confidence Assessment (DCA) rating remains at RED at 25/26 Q4. This is primarily due to delivery of HS2 being unachievable against Baseline 7.1 (approved at Notice to Proceed in April 2020), as confirmed through correspondence between the HS2 Ltd Chief Executive Officer (CEO) and the Secretary of State in 2025. In response, the…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"DFT_0040_2021-Q1","year":2021,"name":"HS2 Phase1","department":"DFT","category":"Infrastructure and Construction","description":"HS2 will form the backbone of the UK's transport network, connecting eight out of ten of Britain's largest cities. By making it easier to move between the North, Midlands and South, cutting many journeys by half, HS2 will make it easier for people to live and work where they want.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber/red.This is primarily due to the following factors: Activity since the last IPA RAG rating includes: - In April 2020, the Government approved the Full Business Case for Phase One and agreed a revised funding regime and governance arrangements to take the programme forward. This permitted Main Works Civils Contractors to begin construction of Phase One. This year's key achievements include: . progressing the remaining enabling works and mobilising main civil construction for Phase One while employing COVID-safe working practices . achieving consolidation point for Old Oak Common station allowing construction to commence . evolving our approach to community engagement, including an enhanced complaints procedure to address concerns about how HS2's impact on communities along the line of route are managed . implementation of over a quarter of the proposed reforms recommended by the Land and Property Review of November 2020 . establishing HS2 Ltd's Environmental Sustainability Committee to limit and mitigate the environmental impacts from the construction of the railway","startDate":"2009-01-14","endDate":"2029-11-30","scheduleNarrative":"The project end-date is 30 November 2029. This is primarily due to the following factors: The target for delivery-into-service of Birmingham Curzon Street to London Old Oak Common remains 2029 to 2033, as set out last year in the Full Business Case. However, as the most recent Parliamentary update on progress stated, some schedule pressures on Phase One have emerged from delays in the period of handover of enabling to main works, including: .issues with completing utilities diversions .postponed land acquisition and access during the first COVID-19 lockdown .slower than planned development of detailed designs by the main works contractors Further cost pressures could emerge if mitigation activity is required to remain on schedule. HS2 Ltd is currently undertaking a schedule mitigation exercise on Phase One, this is due to conclude by Q2 21/22. Work to identify affordable design and delivery arrangements for Euston station is underway.","fyBaseline":3498.0,"fyForecast":3498.0,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":40295.0,"costNarrative":"The projects Baseline Whole Life Cost is �40295.00m. This is primarily due to the following factors: HS2 Ltd continues to report the anticipated final cost at �40.3bn. The total Funding Envelope for Phase 1, including contingency, stands at �44.6bn. As delivery progresses, cost pressures are emerging on the point estimate as risk materialises and these are expected to be managed from within existing contingency delegations. HS2 Ltd continues to assess the impact of COVID on the programme and validated costs incurred will require a draw on Government-held contingency. DfT does not report on the Whole Life Costs of the project as they do not reflect the true up-front capital costs of building the railway.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber/red.This is primarily due to the following factors: Activity since the last IPA RAG rating includes: - In April 2020, the Government approved the Full Business Case for Phase One and agreed a revised funding regime and governance arrangements to take the programme forward.…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21"},{"id":"DFT_0040_2021-Q1","year":2022,"name":"HS2 Phase 1","department":"DFT","category":"Infrastructure and Construction","description":"HS2 will form the backbone of the UK's transport network, connecting Britain's largest cities. By making it easier to move between the North, Midlands and South, cutting many journeys by half, HS2 will make it easier for people to live and work where they want. Phase One will involve the construction of a new high speed railway line between London and the West Midlands, where it will re-join the existing West Coast Mainline.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 decreased from Amber/red to Amber. Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 improved from Amber/Red to Amber. This is primarily due to the reset of the schedule and positive progress with closing out residual enabling works and mobilising construction activity. The project remains early in delivery with significant risk outstanding given the scale, complexity and duration. The HS2 6-monthly report to Parliament published in March 2022 provides the latest review of High Speed Two (HS2) including programme update (https://www.gov.uk/government/speeches/hs2-6-monthly-report-to-parliament-march-2022).","startDate":"2009-01-14","endDate":"2030-06-30","scheduleNarrative":"Compared to 2021-Q4, your project end-date increased from 30 NOV 2029 to 30 JUN 2030. This is primarily due to the following factors: Compared to financial year 20/21-Q4, the project's end-date at 21/22-Q4 remains reported as 2030. This is the agreed Target Date, within the estimated opening range of 2029-2033. There has been some erosion of schedule float as a result of delays at the front end of the programme impacting on the start/ramp-up in Main Works activity, however HS2 Ltd continues to predict it can deliver to the Target Date.","fyBaseline":5060.1,"fyForecast":5060.1,"fyVariance":0.0,"varianceNarrative":"The current in year budget is £5bn. The current annual spend matches the overall budget allocation.","wholeLifeCost":40295.0,"costNarrative":"Compared to 2021-Q4, the projects Baseline Whole Life Cost remained at 40295.00 (£m). This is primarily due to the following factors: The overall budget for Phase 1 (including Euston) remains at £44.6bn (2019 prices) and the target cost remains at £40.3bn. This is ring-fenced in a multi-year settlement to 24/25 by HMT. At Spending Review 2021, the Department retained the settlement agreed last year, although HS2 Ltd is forecasting some pressure on the Phase 1 budget over this period against the agreed profile. Along with the wider UK economy, HS2 is experiencing high levels of inflation. With inflation showing no signs of abating in the short-medium term, the Department and HS2 Ltd remain focused on working to assess and mitigate the impact of inflationary pressures on the programme.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 decreased from Amber/red to Amber. Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 improved from Amber/Red to Amber. This is primarily due to the reset of…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"DFT_0040_2021-Q1","year":2023,"name":"HS2 Phase 1","department":"DFT","category":"Infrastructure and Construction","description":"A new railway connecting the countrys biggest cities and economic regions enabling rebalancing and regional growth in the Midlands Engine and Northern Powerhouse - through a high capacity, high speed and low carbon transport solution.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 decreased from Amber to Red. This is primarily due to the following factors. The Spring Budget required HS2 to rephase parts of Phase 1 to reduce expenditure over the next two years to help manage overall government expenditure whilst protecting the Old Oak Common to Birmingham Curzon Street section. HS2 Ltd has reported further cost pressures across Phase 1 which are currently being reviewed by HS2 Ltd's Board. Phase 1's delivery targets for cost and schedule will need to be amended to address these changes and to address excess inflation given costs continue to be measured in 2019 values.","startDate":"2009-01-14","endDate":null,"scheduleNarrative":"Old Oak Common to Birmingham Curzon Street remains on track to deliver initial services between 2029 and 2033. Works continue to be progressed north of Birmingham but may need to be slowed if necessary to protect initial services. Work south of Old Oak Common including Euston has been paused and a revised schedule depends on when funding is reinstated.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"The current forecast is within 5 per cent of budget.","wholeLifeCost":null,"costNarrative":"WLC does not reflect the true up-front cost for HS2 so is not reported by DfT. The Target Cost for Phase One is 40.3bn, and the overall budget including Euston is 44.6bn. The HS2 budget is in 2019 terms and needs to be rebased to adjust for inflation. HS2 is experiencing high inflation, and HS2L has reported cost pressures, with its estimate at completion under review.On 9 March DfT committed to the delivery of HS2 between Old Oak Common and Birmingham Curzon Street but delayed other parts of Phase 1. DfT and HS2 Ltd are rescheduling delivery and reprofiling costs to protect vfm, but prolongation and delay costs have not been assessed, and will depend on when funding is available.DfT is committed to delivering services to Euston, and is working with HS2L on affordability to protect vfm, this includes investing in more mature designs and cost-effective delivery approaches.","benefits":32850.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 32850m. The HS2 Programme tracks progress against its benefits baseline through quarterly reporting. This reporting is not monetised but uses natural measures to reflect whether the outcomes are being achieved. It continues to RAG rate Green overall in terms of the benefits being reported during design and construction. The work to reschedule delivery and reprofile costs will be reflected in revised benefits baselines. It is anticipated that benefits will be delayed rather than forfeited.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 decreased from Amber to Red. This is primarily due to the following factors. The Spring Budget required HS2 to rephase parts of Phase 1 to reduce expenditure over the next two years to help manage overall government expenditure…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"DFT_0040_2021-Q1","year":2024,"name":"HS2 Phase 1","department":"DFT","category":"Infrastructure and Construction","description":"A new high-capacity, high-speed railway connecting London and the West Midlands with onward services to other cities, via the existing West Coast Main Line.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Red. This is primarily due to the following factors. HS2 Ltd has been asked to update its cost estimate to consider the revised scope of Phase 1 and the cancellation of the wider scheme reflecting reduced scope and the costs of any changes. The Department and HS2 Ltd continue to work collaboratively to develop a joint plan setting out an enhanced approach to governance and controls on the project, alongside planned internal changes to accountabilities and leadership structures within HS2 Ltd. Parliament will be updated once a revised cost estimate has been agreed and new targets provided to HS2 Ltd._x000D_ _x000D_ Work has also commenced on an updated Business Case for the revised programme, following the Network North announcement. This will be published in due course and provide an economic assessment following decisions being made on the HS2 train services running to and from Euston.","startDate":"2009-01-14","endDate":null,"scheduleNarrative":"The project's end-date at 23/24-Q4 is ARMP adjustments - Project not yet in a position to give cost/schedule. This is primarily due to the following factors. The forecast date for initial HS2 services between Birmingham Curzon Street and Old Oak Common remains within the range of 2029 to 2033._x000D_ _x000D_ An updated delivery-into-service range for services to Euston will be provided in due course.","fyBaseline":5118.3,"fyForecast":5118.3,"fyVariance":0.0,"varianceNarrative":"The budget variance is inferior or equal to 5%.","wholeLifeCost":null,"costNarrative":"The project's departmental-agree Whole Life Cost at 23/24-Q4 is ARMP adjustments - Project not yet in a position to give cost/schedulem. This is primarily due to the following factors. The Department does not report on Whole Life Cost (WLC) as it does not reflect the true up-front cost for building HS2. Work on managing cost pressures continues, and HS2 Ltd has undertaken a review of Phase 1's estimate at completion (EAC), advising that the updated EAC for the Phase 1 is 49 billion to 57 billion (2019 prices). However, the Department considers that the outturn cost of Phase 1 (pre-Network North changes) should lie between 45 billion and 54 billion and has been clear that HS2 Ltd should deliver at the lower end of this range even if that entails difficult choices. The Department has now also instructed HS2 Ltd to update its EAC to consider the revised scope of Phase 1 in light of the Network North announcement. Parliament will be updated on a new cost range once the revised EAC has been agreed","benefits":null,"benefitsNarrative":"NA The HS2 programme tracks progress against its benefits baseline through quarterly benefits reporting (QBR). This reporting is not monetised but uses natural measures to reflect whether the outcomes are being achieved. For benefits being reported on during design and construction the performance RAG rating for the QBR for 2023/24 Q4 is green overall. Following the Network North announcement, work on the re-baselining of benefits is ongoing as part of the programme reset.","themes":["Cost & funding","Delivery & schedule","Scope & requirements","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Red. This is primarily due to the following factors. HS2 Ltd has been asked to update its cost estimate to consider the revised scope of Phase 1 and the cancellation of the wider scheme reflecting reduced scope and the…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"DFT_0040_2021-Q1","year":2025,"name":"HS2 PHASE I","department":"DfT","category":"Infrastructure and Construction","description":"A new high-capacity, high-speed railway connecting London and the West Midlands with onward services to other cities, via the existing West Coast Main Line.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at RED. This is primarily due to the following factors‚ Since the beginning of 2024, HS2 Ltd has been in Performance Default due to forecasts irrecoverably exceeding the Funding Envelope (£44.6bn - 2019 prices) as well as expressing risks to the delivery into service (DiS) schedule range of 2029 to 2033. The Department has made significant progress in delivering the package of measures announced by the Secretary of State, including: • Reinstating the Ministerial Task Force ensuring greater ministerial oversight and accountability on HS2 Ltd. • Writing to the CEO of HS2 Ltd making it clear that after safety, the primary objective is to deliver the remaining scope at the lowest reasonable cost to the taxpayer, and requesting an initial assessment on the current position of HS2 and his plans for reset. • Starting the reset of HS2. The Department and HS2 Ltd have created a joint single programme and established task forces to oversee various elements of reset with a view to establishing a new and robust baseline in 2026. The reset programme will embed the recommendations from the independent review of major transport projects led by James Stewart. • Working collaboratively with HS2 Ltd to agree a ‘Bridging Protocol’ for the transition period until a new Baseline has been agreed. These interim arrangements provide the Department a greater level of transparency and control of HS2 Ltd expenditure whilst the programme undergoes reset.","startDate":"2009-01-14","endDate":null,"scheduleNarrative":"The project's end-date at 24/25-Q4 is scheduled to be 30/06/2030. This is primarily due to the following factors‚ Since the beginning of 2024, HS2 Ltd has been in Performance Default due to forecasts irrecoverably exceeding the Funding Envelope (£44.6bn - 2019 prices) whilst also expressing several schedule risks to the delivery into service range of 2029 to 2033. DfT has tasked the CEO of HS2 Ltd with undertaking a comprehensive reset of the programme to recommend revised cost and schedule estimates and deliver the remaining work at the lowest reasonable cost. This work will continue over the coming months and the Government will report on progress. The reset will deliver revised ranges for cost and schedule, informed by an agreed method for cost estimation and the recommendations from the independent Major Transport Projects Governance and Assurance Review led by James Stewart. Whilst the reset is ongoing, the Department will manage HS2 Ltd to tighter in-year controls, including targets and metrics to deliver within an annual funding settlement.","fyBaseline":4488.4,"fyForecast":4488.4,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":null,"costNarrative":"The project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) is exempted. This is primarily due to the following factors‚ The Department does not report on Whole Life Cost (WLC) as it does not reflect the true up-front cost for building HS2. DfT has tasked the CEO of HS2 Ltd with undertaking a comprehensive reset of the programme to recommend revised cost and schedule estimates and deliver the remaining work at the lowest reasonable cost. It is important to get this right, which is why the reset will take time and involve close working between HS2 Ltd, the Department and the rest of government. Until the reset of the programme concludes, the Department does not have an agreed estimate of how much the project will cost.","benefits":null,"benefitsNarrative":"The project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) is exempted. This is primarily due to the following factors‚ The HS2 programme tracks progress against its benefits baseline through quarterly benefits reporting (QBR). The current reporting on benefits during design and construction is not monetised but uses natural measures to reflect whether the outcomes are achieved. The HS2 programme is currently being reset, and a reset of the benefits will form part of that work; alongside this, we will update the HS2 business case. In the interim, HS2 Ltd will continue reporting against the existing benefits baseline.","themes":["Cost & funding","Scope & requirements","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at RED. This is primarily due to the following factors‚ Since the beginning of 2024, HS2 Ltd has been in Performance Default due to forecasts irrecoverably exceeding the Funding Envelope (£44.6bn - 2019 prices) as well as…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"DFT_0040_2021-Q1","year":2026,"name":"HS2 PHASE I","department":"DFT","category":"Infrastructure and Construction","description":"A new high-capacity, high-speed railway connecting London and the West Midlands with onward services to other cities, via the existing West Coast Main Line.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"The NISTA / SRO Delivery Confidence Assessment (DCA) rating remains at RED at 25/26 Q4. This is primarily due to delivery of HS2 being unachievable against Baseline 7.1 (approved at Notice to Proceed in April 2020), as confirmed through correspondence between the HS2 Ltd Chief Executive Officer (CEO) and the Secretary of State in 2025. In response, the Department and HS2 Ltd have progressed a comprehensive reset programme, alongside strengthened governance and delivery controls. Key developments include: • Continuing the HS2 reset under the leadership of CEO Mark Wild and Chair Mike Brown, with Board capability strengthened through new Non-Executive Director appointments. • HS2 Ltd providing assured cost and schedule ranges to the Department, approved by the Ministerial Task Force in January 2026, with further conditions (including the outcome of the Strategic Scope Review) addressed ahead of publication and announcement by the Secretary of State on 19 May 2026. • Commencing development of a new delivery baseline (Baseline 8.0/8.1), supported by a staged review process to ensure robust assurance and programme integration. • Maintaining tight in-year financial and performance controls through the Performance Management Plan (PMP), contributing to improved construction productivity and delivery within annual budgets. • Delivering FY25/26 Phase 1 expenditure and maximising productivity in line with budget (£6.967bn, 0.4% below Supplementary Estimates) and agreeing a £7.1bn funding allocation for FY26/27. • Progressing Euston Programme activities, including definition of an integrated Euston Station Spatial Plan and delivery schedule, the stand-up of the Euston Delivery Company in April 2026, continuation of enabling works and exploration of a private finance delivery model for the HS2 station. Overall, the Department has focused on resetting the programme to establish a credible, deliverable baseline while maintaining cost control, improving productivity, and strengthening governance arrangements.","startDate":"2009-01-14","endDate":null,"scheduleNarrative":"As at 25/26 Q4, the previous delivery into service range of 2029–2033 is unachievable, as confirmed through correspondence between the HS2 Ltd CEO and the Secretary of State in 2025. In response, the Department and HS2 Ltd have progressed a comprehensive reset programme. Key developments include: • The Department has tasked the HS2 Ltd CEO with progressing a comprehensive reset to establish realistic cost and schedule estimates for delivering the remaining scope at the lowest reasonable cost. Assured schedule ranges were provided to the Department in December 2025 and approved by the Ministerial Task Force in January 2026, with further conditions (including the outcome of the Strategic Scope review) addressed ahead of publication and announcement by the Secretary of State on 19 May 2026. • The reset will deliver updated schedule ranges for key service configurations (Old Oak Common–Birmingham, Euston–Birmingham, and Euston–North West) and inform development of a new schedule baseline (Baseline 8.0/8.1). Baseline development commenced in January 2026 and is subject to a progressive integrated review and assurance process. • Whilst the reset is ongoing, the Department continues to manage HS2 Ltd through strengthened in-year controls, including a Performance Management Plan for 2026/27 setting out key milestones, targets and productivity metrics. Enhanced governance and assurance arrangements, aligned to the James Stewart Review, remain in place to support in-year delivery and schedule discipline.","fyBaseline":3489.25,"fyForecast":3489.25,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":null,"costNarrative":"At 25/26 Q4, the departmentally agreed Whole Life Cost (measured in £m) for HS2 is exempted. The Department does not report on Whole Life Cost as it does not reflect the true up-front cost for building HS2. Key developments include: • The Department has tasked the HS2 Ltd CEO with progressing a comprehensive reset to establish realistic cost and schedule estimates for delivering the remaining scope at the lowest reasonable cost. Assured cost ranges were provided to the Department in December 2025 and approved by the Ministerial Task Force in January 2026, with further conditions set ahead of public announcement, including consideration of the Strategic Scope Review. As the Secretary of State publicly announced on 19 May 2026, the expected cost of delivering HS2 is now in the range of £87.7 – £102.7 billion. This is expressed in a mixed price base, including the cash outturn of works to date and the costs of future work excluding inflation. • The HS2 reset is ongoing and work continues to progress on development of a new cost baseline (Baseline 8.0/8.1). Baseline development commenced in January 2026 and is subject to a progressive integrated review and assurance process. • Whilst the reset is ongoing, the Department continues to manage HS2 Ltd through strengthened in-year controls, including a Performance Management Plan for 2026/27 and application of financial controls to support affordability and delivery confidence. • Funding provided through the Spending Review 2025 settlement supports continued delivery between the West Midlands and London Euston, alongside reset activities. Cost control remains focused on improving productivity, strengthening governance, and embedding lessons learned to ensure the programme can be delivered within future agreed budgets.","benefits":null,"benefitsNarrative":"The project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) is exempted. The HS2 programme tracks progress against its benefits baseline through quarterly benefits reporting (QBR). The current reporting on benefits during design and construction is not monetised but uses natural measures to reflect whether the outcomes are achieved. The HS2 programme is currently being reset, and a reset of the programme’s benefits will form part of that programme of work; alongside this, we will update the HS2 business case. In the interim, HS2 Ltd will continue reporting against the existing benefits baseline.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Scope & requirements"],"evidenceExcerpt":"The NISTA / SRO Delivery Confidence Assessment (DCA) rating remains at RED at 25/26 Q4. This is primarily due to delivery of HS2 being unachievable against Baseline 7.1 (approved at Notice to Proceed in April 2020), as confirmed through correspondence between the HS2 Ltd Chief Executive Officer (CEO) and the Secretary of State in 2025. In response, the…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"DFT_0040_2021-Q1","year":2025,"name":"HS2 PHASE I","department":"DfT","category":"Infrastructure and Construction","description":"A new high-capacity, high-speed railway connecting London and the West Midlands with onward services to other cities, via the existing West Coast Main Line.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at RED. This is primarily due to the following factors‚ Since the beginning of 2024, HS2 Ltd has been in Performance Default due to forecasts irrecoverably exceeding the Funding Envelope (£44.6bn - 2019 prices) as well as expressing risks to the delivery into service (DiS) schedule range of 2029 to 2033. The Department has made significant progress in delivering the package of measures announced by the Secretary of State, including: • Reinstating the Ministerial Task Force ensuring greater ministerial oversight and accountability on HS2 Ltd. • Writing to the CEO of HS2 Ltd making it clear that after safety, the primary objective is to deliver the remaining scope at the lowest reasonable cost to the taxpayer, and requesting an initial assessment on the current position of HS2 and his plans for reset. • Starting the reset of HS2. The Department and HS2 Ltd have created a joint single programme and established task forces to oversee various elements of reset with a view to establishing a new and robust baseline in 2026. The reset programme will embed the recommendations from the independent review of major transport projects led by James Stewart. • Working collaboratively with HS2 Ltd to agree a ‘Bridging Protocol’ for the transition period until a new Baseline has been agreed. These interim arrangements provide the Department a greater level of transparency and control of HS2 Ltd expenditure whilst the programme undergoes reset.","startDate":"2009-01-14","endDate":null,"scheduleNarrative":"The project's end-date at 24/25-Q4 is scheduled to be 30/06/2030. This is primarily due to the following factors‚ Since the beginning of 2024, HS2 Ltd has been in Performance Default due to forecasts irrecoverably exceeding the Funding Envelope (£44.6bn - 2019 prices) whilst also expressing several schedule risks to the delivery into service range of 2029 to 2033. DfT has tasked the CEO of HS2 Ltd with undertaking a comprehensive reset of the programme to recommend revised cost and schedule estimates and deliver the remaining work at the lowest reasonable cost. This work will continue over the coming months and the Government will report on progress. The reset will deliver revised ranges for cost and schedule, informed by an agreed method for cost estimation and the recommendations from the independent Major Transport Projects Governance and Assurance Review led by James Stewart. Whilst the reset is ongoing, the Department will manage HS2 Ltd to tighter in-year controls, including targets and metrics to deliver within an annual funding settlement.","fyBaseline":4488.4,"fyForecast":4488.4,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":null,"costNarrative":"The project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) is exempted. This is primarily due to the following factors‚ The Department does not report on Whole Life Cost (WLC) as it does not reflect the true up-front cost for building HS2. DfT has tasked the CEO of HS2 Ltd with undertaking a comprehensive reset of the programme to recommend revised cost and schedule estimates and deliver the remaining work at the lowest reasonable cost. It is important to get this right, which is why the reset will take time and involve close working between HS2 Ltd, the Department and the rest of government. Until the reset of the programme concludes, the Department does not have an agreed estimate of how much the project will cost.","benefits":null,"benefitsNarrative":"The project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) is exempted. This is primarily due to the following factors‚ The HS2 programme tracks progress against its benefits baseline through quarterly benefits reporting (QBR). The current reporting on benefits during design and construction is not monetised but uses natural measures to reflect whether the outcomes are achieved. The HS2 programme is currently being reset, and a reset of the benefits will form part of that work; alongside this, we will update the HS2 business case. In the interim, HS2 Ltd will continue reporting against the existing benefits baseline.","themes":["Cost & funding","Scope & requirements","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at RED. This is primarily due to the following factors‚ Since the beginning of 2024, HS2 Ltd has been in Performance Default due to forecasts irrecoverably exceeding the Funding Envelope (£44.6bn - 2019 prices) as well as…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":null,"attentionScore":35,"attentionReasons":["Current published delivery confidence is Red"]},{"id":"DESNZ_0397_2425-Q2","year":2026,"name":"Hydrogen Allocation Round 2 (HAR2)","department":"DESNZ","category":"Infrastructure and Construction","description":"The second hydrogen allocation round 2 (HAR2) is a competitive allocation round designed to provide long term revenue support via the Hydrogen Production Business Model to hydrogen production projects. In alignment with HAR1, HAR2 aims to unlock private investment, accelerate early hydrogen deployment and support the growth of hydrogen supply chains, whilst contributing to long term decarbonisation and energy system resilience. The Hydrogen Production Business Model (HPBM) is designed to provide revenue support to low carbon hydrogen producers once their project is operational, helping them to overcome the operating cost gap between low carbon hydrogen and high carbon fossil fuels. HAR2 contract allocation is pending, with 27 projects shortlisted and the due diligence phase now complete. The round aims to significantly scale up the UK’s green economy, with successful projects expected to be operational in the coming years.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"There is no comparison to financial year 24/25 Q4 as this project was added to GMPP in financial year 25/26 Q3. Compared to the previous quarter, the delivery confidence rating remains at Red as the project has not currently progressed to the 'Invite to Offer' (ITO) stage. This is primarily due to delays in OBC Approval (from September 2025) and subsequent delays to the commencement of the ITO and Negotiations phase. Ongoing delays will impact on our ability to deliver HAR2 contract awards within the timelines set out in the HAR2 published guidance","startDate":"2023-12-14","endDate":"2041-12-31","scheduleNarrative":"There is no comparison to financial year 24/25 Q4 as this project was added to GMPP in financial year 25/26 Q3. Compared to Q3, the end date remains the same. This is primarily due to the following factors: If we can sign contracts with projects by -financial year 26/27 Q3, the HAR2 end date of 31/12/2041 would still apply. However, we are unable to produce meaningful baseline and forecast dates until we have clarity on ITO start and therefore the HAR2 end date may be subject to change.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"There is no variance in the budget.","wholeLifeCost":9427.02,"costNarrative":"WLC are £9427.02m in Real Prices 24/25 as calculated by NISTA based on £9061m (DESNZ Nominal Pricing)","benefits":5626.77,"benefitsNarrative":"Benefits are £5626.77m in Real Prices 24/25 as calculated by NISTA based on £5408m (DESNZ Real Prices Calendar Year 2023)","themes":["Cost & funding","Approvals & decisions","Commercial & supply chain","Delivery & schedule"],"evidenceExcerpt":"There is no comparison to financial year 24/25 Q4 as this project was added to GMPP in financial year 25/26 Q3. Compared to the previous quarter, the delivery confidence rating remains at Red as the project has not currently progressed to the 'Invite to Offer' (ITO) stage. This is primarily due to delays in OBC Approval (from September 2025) and subsequent…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"DESNZ_0397_2425-Q2","year":2026,"name":"Hydrogen Allocation Round 2 (HAR2)","department":"DESNZ","category":"Infrastructure and Construction","description":"The second hydrogen allocation round 2 (HAR2) is a competitive allocation round designed to provide long term revenue support via the Hydrogen Production Business Model to hydrogen production projects. In alignment with HAR1, HAR2 aims to unlock private investment, accelerate early hydrogen deployment and support the growth of hydrogen supply chains, whilst contributing to long term decarbonisation and energy system resilience. The Hydrogen Production Business Model (HPBM) is designed to provide revenue support to low carbon hydrogen producers once their project is operational, helping them to overcome the operating cost gap between low carbon hydrogen and high carbon fossil fuels. HAR2 contract allocation is pending, with 27 projects shortlisted and the due diligence phase now complete. The round aims to significantly scale up the UK’s green economy, with successful projects expected to be operational in the coming years.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"There is no comparison to financial year 24/25 Q4 as this project was added to GMPP in financial year 25/26 Q3. Compared to the previous quarter, the delivery confidence rating remains at Red as the project has not currently progressed to the 'Invite to Offer' (ITO) stage. This is primarily due to delays in OBC Approval (from September 2025) and subsequent delays to the commencement of the ITO and Negotiations phase. Ongoing delays will impact on our ability to deliver HAR2 contract awards within the timelines set out in the HAR2 published guidance","startDate":"2023-12-14","endDate":"2041-12-31","scheduleNarrative":"There is no comparison to financial year 24/25 Q4 as this project was added to GMPP in financial year 25/26 Q3. Compared to Q3, the end date remains the same. This is primarily due to the following factors: If we can sign contracts with projects by -financial year 26/27 Q3, the HAR2 end date of 31/12/2041 would still apply. However, we are unable to produce meaningful baseline and forecast dates until we have clarity on ITO start and therefore the HAR2 end date may be subject to change.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"There is no variance in the budget.","wholeLifeCost":9427.02,"costNarrative":"WLC are £9427.02m in Real Prices 24/25 as calculated by NISTA based on £9061m (DESNZ Nominal Pricing)","benefits":5626.77,"benefitsNarrative":"Benefits are £5626.77m in Real Prices 24/25 as calculated by NISTA based on £5408m (DESNZ Real Prices Calendar Year 2023)","themes":["Cost & funding","Approvals & decisions","Commercial & supply chain","Delivery & schedule"],"evidenceExcerpt":"There is no comparison to financial year 24/25 Q4 as this project was added to GMPP in financial year 25/26 Q3. Compared to the previous quarter, the delivery confidence rating remains at Red as the project has not currently progressed to the 'Invite to Offer' (ITO) stage. This is primarily due to delays in OBC Approval (from September 2025) and subsequent…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":null,"ratingDelta":null,"transition":"Not comparable","endDateDeltaDays":null,"attentionScore":35,"attentionReasons":["Current published delivery confidence is Red"]},{"id":"MOD_0109_1617-Q2","year":2026,"name":"NEW STYLE OF INFORMATION TECHNOLOGY DEPLOYED","department":"MOD","category":"Information and Communications Technology (ICT)","description":"The Programme aims to deliver a MOD-owned, highly secure, technologically advanced and evolutionary communications and information service that connects war-fighters and enables information advantage across the operational landscape. It will provide operational commanders in the Maritime and Land environments with a modern enduring mission configurable command and control IT system that will deliver the operational services that they require at OFFICIAL, SECRET and Mission SECRET classifications. The in-house delivery of this new system known as OpNET will replace multiple deployable IT systems and will allow the MOD to extract itself from expensive monolithic support contracts.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Red. This is primarily due to the following factors. 1. The programme is currently operating 12 months behind schedule in delivering capability to the Maritime and Land sectors. 2. The delays stem from overly optimistic planning assumptions, ongoing resource and funding constraints, all of which have contributed to increased costs. 3. Delivery to the Land environment is now largely complete, with transition from legacy systems to OpNET expected by end of May 2026. 4. Maritime delivery has gained momentum, however, installation timelines remain constrained by vessel availability. 5. The programme is currently being reset with a reduced scope to ensure it can deliver within budget.","startDate":"2015-04-01","endDate":"2029-03-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the programmes end-date at 25/26-Q4 increased from 31/03/2029 to 30/04/2030. This is primarily due to the following factors. 1. Delays in delivery and the availability of Navy platforms for OpNET to be installed.","fyBaseline":114.02,"fyForecast":111.26,"fyVariance":2.42,"varianceNarrative":"The budget variance is less than or equal to 5%","wholeLifeCost":1598.79,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) remained at £1399M.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmental-agreed monetised benefits at 25/26-Q4 remained at 0m","themes":["Cost & funding","Delivery & schedule","Scope & requirements","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Red. This is primarily due to the following factors. 1. The programme is currently operating 12 months behind schedule in delivering capability to the Maritime and Land sectors. 2. The delays stem from overly optimistic planning…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"MOD_0109_1617-Q2","year":2020,"name":"New Style of Information Technology Deployed","department":"MOD","category":"Military Capability","description":"The provision of an IT system which will deliver operational information service to Land, Air, Maritime and Joint users in all physical environments.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Exempt under Section 26 of Freedom of Information Act 2000 (Defence)","startDate":"2015-04-01","endDate":"2025-03-25","scheduleNarrative":"Exempt under Section 26 of Freedom of Information Act 2000 (Defence)","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests)","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests)","benefits":null,"benefitsNarrative":"","themes":["Commercial & supply chain"],"evidenceExcerpt":"Exempt under Section 26 of Freedom of Information Act 2000 (Defence) Exempt under Section 26 of Freedom of Information Act 2000 (Defence)","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2020","sourceLabel":"IPA Annual Report 2019-20"},{"id":"MOD_0109_1617-Q2","year":2021,"name":"New Style of Information Technology Deployed","department":"MOD","category":"Military Capability","description":"Exempt under Section 24 of the Freedom of Information Act 2000 (National security)","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 26 of the Freedom of Information Act 2000 (Defence)","startDate":"2015-04-01","endDate":"2025-03-25","scheduleNarrative":"Exempt under Section 26 of the Freedom of Information Act 2000 (Defence)","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under section 22 of the Freedom of information act 2000 (Information intended for future publication)","wholeLifeCost":null,"costNarrative":"Exempt under Section 24 of the Freedom of Information Act 2000 (National security)","benefits":null,"benefitsNarrative":"","themes":[],"evidenceExcerpt":"Exempt under Section 26 of the Freedom of Information Act 2000 (Defence) Exempt under Section 26 of the Freedom of Information Act 2000 (Defence)","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21"},{"id":"MOD_0109_1617-Q2","year":2022,"name":"New Style of Information Technology Deployed","department":"MOD","category":"Military Capability","description":"Exempt under Section 26 of Freedom of Information Act 2000 (Defence).","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 26 of Freedom of Information Act 2000 (Defence).","startDate":null,"endDate":null,"scheduleNarrative":"Exempt under Section 26 of Freedom of Information Act 2000 (Defence).","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 26 of Freedom of Information Act 2000 (Defence).","wholeLifeCost":null,"costNarrative":"Exempt under Section 26 of Freedom of Information Act 2000 (Defence).","benefits":null,"benefitsNarrative":"","themes":[],"evidenceExcerpt":"Exempt under Section 26 of Freedom of Information Act 2000 (Defence). Exempt under Section 26 of Freedom of Information Act 2000 (Defence).","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"MOD_0109_1617-Q2","year":2023,"name":"New Style of Information Technology Deployed","department":"MOD","category":"Military Capability","description":"The Programme aims to deliver an MOD-owned; highly secure; technologically advanced and evolutionary communications and information service that connects war-fighters and enables information advantage across the operational landscape.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 is Amber. This is primarily due to the following factors. Since the 2022 Q4 report the Programme has faced challenges with delivery in both the Land and Maritime environments, due to multiple factors and revised planning is in place and approval is being sought.","startDate":"2015-04-01","endDate":"2028-03-31","scheduleNarrative":"The project's end-date at 22/23-Q4 is 2028-03-31. This is primarily due to the following factors. NA","fyBaseline":117.25,"fyForecast":105.79,"fyVariance":-10.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors: Unspent risk inside costing, deferral's primarily due to supply chain issues, efficiencies mainly against material purchases. These reductions have been offset in part by the inclusion of an in year Capital Defence Expenditure Limit charge; net in year increase relates to an International Financial Reporting Standard 16 accounting payment that has been paid in year.","wholeLifeCost":835.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 22/23-Q4 is 835m. This is primarily due to the following factors. Whole Life Costs have reduced by 4.3M. The key factors are in year unspent risk inside costing, efficiencies mainly against material purchases, changed costing and further deferred costings.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This programme does not report cashable benefits. Its aim is to provision the armed forces with the equipment and / or infrastructure required.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 is Amber. This is primarily due to the following factors. Since the 2022 Q4 report the Programme has faced challenges with delivery in both the Land and Maritime environments, due to multiple factors and revised planning is in place and approval is being sought. The project's…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"MOD_0109_1617-Q2","year":2024,"name":"New Style of Information Technology Deployed","department":"MOD","category":"Military Capability","description":"The Programme aims to deliver an MOD-owned; highly secure; technologically advanced and evolutionary communications and information service that connects war-fighters and enables information advantage across the operational landscape. It will provide operational commanders in the Maritime and Land environments with a modern; enduring mission configurable command and control IT system that will deliver the operational services that they require at OFFICIAL; SECRET and Mission SECRET classifications. The in-house delivery of this new system; known as OpNET; will replace multiple deployable IT systems and will allow the MOD to extract itself from expensive; monolithic support contracts.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. Delivery to the Maritime Environment remains complex and is regularly impacted by changes to platform availability. There are also ongoing concerns relating to resourcing in the face of centrally driven reductions in headcount.","startDate":"2015-04-01","endDate":"2029-03-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 increased from 2028-03-31 to 2029-03-31. This is primarily due to the following factors. Project End Date adjusted to align with Full Business Case 3 which was approved in December 2023. Full Operating Capability is now forecast to be declared in April 2030 primarily due to ship availability beyond the current approval caused by changes in operational deployments.Â","fyBaseline":113.69,"fyForecast":93.61,"fyVariance":-17.662,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The key factors are in year unspent risk inside costing, efficiencies mainly against material purchases, changed costing and further deferred costings. Further increases in the following year will be dependant on funding uplifts for deferred measures.","wholeLifeCost":1397.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 increased from 835m. to 1397m. This is primarily due to the following factors. Approval of Full Business Case 3 covering the next 5 years was received in December 2023. The in year variance resulted in a net 17m reduction in the Whole Life Costs. Further offsets against the in year deferrals will be dependant on funding uplifts in FY24/25.","benefits":0.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 0m.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. Delivery to the Maritime Environment remains complex and is regularly impacted by changes to platform availability. There are also ongoing concerns relating to…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"MOD_0109_1617-Q2","year":2025,"name":"NEW STYLE OF INFORMATION TECHNOLOGY DEPLOYED","department":"MoD","category":"ICT","description":"The Programme aims to deliver a MOD-owned, highly secure, technologically advanced and evolutionary communications and information service that connects war-fighters and enables information advantage across the operational landscape. It will provide operational commanders in the Maritime and Land environments with a modern, enduring mission configurable command and control IT system that will deliver the operational services that they require at Official, Secret and Mission Secret classifications. The in-house delivery of this new system, known as OpNET, will replace multiple deployable IT systems and will allow the MOD to extract itself from expensive, monolithic support contracts.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Project's Delivery Confidence Assessment rating at 24/25-Q4 is RED, compared with the Infrastructure and Projects Authority's assessment last year of AMBER. This is due to the following factors. The programme is currently running approximately 12 months behind schedule in delivering to Maritime and Land sectors. Maritime delivery continues to pose challenges with frequent disruptions due to changes in platform availability. Within the Land environment, the Front Line Commands are facing difficulties in navigating the complexity of building OpNET nodes, leading to delays in transitioning from legacy systems. Financial and resource constraints have further constrained the programme's ability to address these challenges, thereby exacerbating the situation.","startDate":"2015-04-01","endDate":"2029-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2029.","fyBaseline":115.51,"fyForecast":102.78,"fyVariance":11.02,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. Removal of in-year unspent Risk Inside Costing, resourcing and hardware purchasing efficiencies, changed costings and deferred costings. Increases in the following year will be dependent on funding uplifts for deferred measures.","wholeLifeCost":1399.03,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 1397 to 1399. This is primarily due to the following factors. The project's departmental-agreed Whole Life Cost at 24/25-Q4 increased from £1,397M to £1,399M but remains within approval tolerances.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0.","themes":["Cost & funding","Delivery & schedule","Workforce & capability","Approvals & decisions"],"evidenceExcerpt":"The Project's Delivery Confidence Assessment rating at 24/25-Q4 is RED, compared with the Infrastructure and Projects Authority's assessment last year of AMBER. This is due to the following factors. The programme is currently running approximately 12 months behind schedule in delivering to Maritime and Land sectors. Maritime delivery continues to pose…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"MOD_0109_1617-Q2","year":2026,"name":"NEW STYLE OF INFORMATION TECHNOLOGY DEPLOYED","department":"MOD","category":"Information and Communications Technology (ICT)","description":"The Programme aims to deliver a MOD-owned, highly secure, technologically advanced and evolutionary communications and information service that connects war-fighters and enables information advantage across the operational landscape. It will provide operational commanders in the Maritime and Land environments with a modern enduring mission configurable command and control IT system that will deliver the operational services that they require at OFFICIAL, SECRET and Mission SECRET classifications. The in-house delivery of this new system known as OpNET will replace multiple deployable IT systems and will allow the MOD to extract itself from expensive monolithic support contracts.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Red. This is primarily due to the following factors. 1. The programme is currently operating 12 months behind schedule in delivering capability to the Maritime and Land sectors. 2. The delays stem from overly optimistic planning assumptions, ongoing resource and funding constraints, all of which have contributed to increased costs. 3. Delivery to the Land environment is now largely complete, with transition from legacy systems to OpNET expected by end of May 2026. 4. Maritime delivery has gained momentum, however, installation timelines remain constrained by vessel availability. 5. The programme is currently being reset with a reduced scope to ensure it can deliver within budget.","startDate":"2015-04-01","endDate":"2029-03-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the programmes end-date at 25/26-Q4 increased from 31/03/2029 to 30/04/2030. This is primarily due to the following factors. 1. Delays in delivery and the availability of Navy platforms for OpNET to be installed.","fyBaseline":114.02,"fyForecast":111.26,"fyVariance":2.42,"varianceNarrative":"The budget variance is less than or equal to 5%","wholeLifeCost":1598.79,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) remained at £1399M.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmental-agreed monetised benefits at 25/26-Q4 remained at 0m","themes":["Cost & funding","Delivery & schedule","Scope & requirements","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Red. This is primarily due to the following factors. 1. The programme is currently operating 12 months behind schedule in delivering capability to the Maritime and Land sectors. 2. The delays stem from overly optimistic planning…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"MOD_0109_1617-Q2","year":2025,"name":"NEW STYLE OF INFORMATION TECHNOLOGY DEPLOYED","department":"MoD","category":"ICT","description":"The Programme aims to deliver a MOD-owned, highly secure, technologically advanced and evolutionary communications and information service that connects war-fighters and enables information advantage across the operational landscape. It will provide operational commanders in the Maritime and Land environments with a modern, enduring mission configurable command and control IT system that will deliver the operational services that they require at Official, Secret and Mission Secret classifications. The in-house delivery of this new system, known as OpNET, will replace multiple deployable IT systems and will allow the MOD to extract itself from expensive, monolithic support contracts.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Project's Delivery Confidence Assessment rating at 24/25-Q4 is RED, compared with the Infrastructure and Projects Authority's assessment last year of AMBER. This is due to the following factors. The programme is currently running approximately 12 months behind schedule in delivering to Maritime and Land sectors. Maritime delivery continues to pose challenges with frequent disruptions due to changes in platform availability. Within the Land environment, the Front Line Commands are facing difficulties in navigating the complexity of building OpNET nodes, leading to delays in transitioning from legacy systems. Financial and resource constraints have further constrained the programme's ability to address these challenges, thereby exacerbating the situation.","startDate":"2015-04-01","endDate":"2029-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2029.","fyBaseline":115.51,"fyForecast":102.78,"fyVariance":11.02,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. Removal of in-year unspent Risk Inside Costing, resourcing and hardware purchasing efficiencies, changed costings and deferred costings. Increases in the following year will be dependent on funding uplifts for deferred measures.","wholeLifeCost":1399.03,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 1397 to 1399. This is primarily due to the following factors. The project's departmental-agreed Whole Life Cost at 24/25-Q4 increased from £1,397M to £1,399M but remains within approval tolerances.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0.","themes":["Cost & funding","Delivery & schedule","Workforce & capability","Approvals & decisions"],"evidenceExcerpt":"The Project's Delivery Confidence Assessment rating at 24/25-Q4 is RED, compared with the Infrastructure and Projects Authority's assessment last year of AMBER. This is due to the following factors. The programme is currently running approximately 12 months behind schedule in delivering to Maritime and Land sectors. Maritime delivery continues to pose…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":0,"attentionScore":35,"attentionReasons":["Current published delivery confidence is Red"]},{"id":"DFT_0413_2425-Q2","year":2026,"name":"Rail Reform: Stand-Up of GBR","department":"DFT","category":"Government Transformation and Service Delivery","description":"The programme will enable the biggest overhaul of the rail sector in a generation. It will enable the establishment of GBR as a new ‘directing mind’ for the railway, unifying track and train under a single public body to deliver better services for passengers and freight customers, and better value for money for taxpayers. GBR will have the tools and operational independence it needs to plan and run the rail system on a long-term basis to deliver for passengers. GBR will make long term capacity allocation, planning and investment decisions to give greater certainty to rail freight operators, open access, and the wider supply chain. The legislation will establish a powerful new passenger watchdog to champion improvements in rail services for passengers. It will protect and advocate for passengers’ interests and rights, offer advice, address unresolved passenger complaints and independently monitor service performance reporting on its findings publicly and transparently.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"The Railways Bill will pave the way for the creation of Great British Railways (GBR), due to be set up later in 2027. The transfer of passenger services to public ownership – a key element of the reform programme – continues at pace, with Govia Thameslink Railway’s (GTR) services the most recent to switch in May this year. The Bill is a key dependency and is currently in Parliament, therefore, it is not possible to predict, the exact scheduling and level of amendments it may still face as part of Lords and Commons scrutiny. Combining these uncertain timescales with the complexity and challenges of key elements of what is the biggest transformation of the railways in a generation, means that the NISTA/SRO Delivery Confidence Assessment (DCA) rating remains RED as of the last two quarters (Q3/Q4) of 2025/26. This rating transparently reflects the level of uncertainty and dependencies and mitigates against optimism bias. However, significant progress continues to be made on all aspects of the reform programme and as a result we expect the delivery confidence to improve. Most notably, work continues on a number of critical design and implementation decisions, alongside government approvals, which are required to deliver the reforms set out in the Bill and GBR itself. These decisions, when made, combined with Parliamentary progress are expected to provide greater clarity and stability across the programme.","startDate":"2024-07-01","endDate":null,"scheduleNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide costs/schedule information","wholeLifeCost":null,"costNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","benefits":null,"benefitsNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","themes":["Delivery & schedule","Cost & funding","Governance & assurance","Scope & requirements"],"evidenceExcerpt":"The Railways Bill will pave the way for the creation of Great British Railways (GBR), due to be set up later in 2027. The transfer of passenger services to public ownership – a key element of the reform programme – continues at pace, with Govia Thameslink Railway’s (GTR) services the most recent to switch in May this year. The Bill is a key dependency and…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"DFT_0413_2425-Q2","year":2026,"name":"Rail Reform: Stand-Up of GBR","department":"DFT","category":"Government Transformation and Service Delivery","description":"The programme will enable the biggest overhaul of the rail sector in a generation. It will enable the establishment of GBR as a new ‘directing mind’ for the railway, unifying track and train under a single public body to deliver better services for passengers and freight customers, and better value for money for taxpayers. GBR will have the tools and operational independence it needs to plan and run the rail system on a long-term basis to deliver for passengers. GBR will make long term capacity allocation, planning and investment decisions to give greater certainty to rail freight operators, open access, and the wider supply chain. The legislation will establish a powerful new passenger watchdog to champion improvements in rail services for passengers. It will protect and advocate for passengers’ interests and rights, offer advice, address unresolved passenger complaints and independently monitor service performance reporting on its findings publicly and transparently.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"The Railways Bill will pave the way for the creation of Great British Railways (GBR), due to be set up later in 2027. The transfer of passenger services to public ownership – a key element of the reform programme – continues at pace, with Govia Thameslink Railway’s (GTR) services the most recent to switch in May this year. The Bill is a key dependency and is currently in Parliament, therefore, it is not possible to predict, the exact scheduling and level of amendments it may still face as part of Lords and Commons scrutiny. Combining these uncertain timescales with the complexity and challenges of key elements of what is the biggest transformation of the railways in a generation, means that the NISTA/SRO Delivery Confidence Assessment (DCA) rating remains RED as of the last two quarters (Q3/Q4) of 2025/26. This rating transparently reflects the level of uncertainty and dependencies and mitigates against optimism bias. However, significant progress continues to be made on all aspects of the reform programme and as a result we expect the delivery confidence to improve. Most notably, work continues on a number of critical design and implementation decisions, alongside government approvals, which are required to deliver the reforms set out in the Bill and GBR itself. These decisions, when made, combined with Parliamentary progress are expected to provide greater clarity and stability across the programme.","startDate":"2024-07-01","endDate":null,"scheduleNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide costs/schedule information","wholeLifeCost":null,"costNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","benefits":null,"benefitsNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","themes":["Delivery & schedule","Cost & funding","Governance & assurance","Scope & requirements"],"evidenceExcerpt":"The Railways Bill will pave the way for the creation of Great British Railways (GBR), due to be set up later in 2027. The transfer of passenger services to public ownership – a key element of the reform programme – continues at pace, with Govia Thameslink Railway’s (GTR) services the most recent to switch in May this year. The Bill is a key dependency and…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":null,"ratingDelta":null,"transition":"Not comparable","endDateDeltaDays":null,"attentionScore":35,"attentionReasons":["Current published delivery confidence is Red"]},{"id":"HO_0373_2425-Q1","year":2026,"name":"Civil Registration Service Transformation (CReST)","department":"HO","category":"Government Transformation and Service Delivery","description":"The programme will enable improvements within the General Register Office (GRO) for England and Wales delivery of its statutory service obligations; the Home Office and the Government’s wider digital identity ambitions, and the provisions within new legislative instruments for the modernisation of services.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared with Q4 2024/25, the NISTA / SRO Delivery Confidence Assessment (DCA) rating for Q4 2025/26 remains Amber. This reflects a combination of continued delivery progress alongside ongoing risks and dependencies. There has been positive progress in the delivery of digital products and services, including strong uptake across Local Registration Services, with the Death Registration Service now live in all districts. However, delays relating to key digital infrastructure dependencies have impacted overall progress. Challenges with the quality of record transcription have required a reassessment of the Record Digitisation project’s scope and delivery approach. The Programme Board has agreed that this is an appropriate point to review requirements, with the intention of re-procuring within the next 12 months. This approach is expected to enable the programme to take advantage of emerging technologies, including artificial intelligence, to improve digitisation outcomes and value for money. As a result, timelines for record digitisation are expected to extend to accommodate this re-procurement activity. The Registration Legacy Infrastructure Transformation Project has continued to progress well, including the successful completion of a proof of concept to transition services onto a single site. This is expected to help alleviate estate-related pressures within the General Register Office (GRO), with the potential for this phase of the project to be delivered ahead of schedule.","startDate":null,"endDate":"2030-08-15","scheduleNarrative":"Compared with Q4 2024/25, the project’s end date at Q4 2025/26 remains unchanged at 29 March 2030. This reflects a broadly stable delivery trajectory, alongside evolving scope and external constraints. Development of new services continues at pace, with key connectivity-related risks having been addressed. A Programme Board decision has been taken not to extend the existing XBP scanning and transcription contract. As a result, a re-procurement exercise will be required, and the programme will reassess the approach to record digitisation to align with its longer-term ambitions. The programme continues to explore innovative approaches to deliver its objectives more effectively. Work is underway to inform business case development and delivery planning for 2026/27, with a focus on identifying clear implementation options that provide a robust basis for decision-making. These plans are being developed in close consideration of end user needs. Following direction at InvestCo in May 2024, the programme has incorporated the decommissioning of over 20 smaller legacy systems that were previously out of scope. A dedicated project—the Registration Legacy Infrastructure Transformation Project (Re-LiT)—was established to deliver this activity. Early progress has been positive, with initial objectives expected to be delivered ahead of schedule and within budget, contributing to the management of wider programme financial pressures.","fyBaseline":51.88,"fyForecast":39.24,"fyVariance":24.37,"varianceNarrative":"The budget variance exceeds 5%, reflecting a combination of delivery rephasing and funding constraints. Since approval of the Programme Business Case (PBC) in September, the programme is forecasting an in-year reduction of approximately 20%. This is partly driven by delays to the Registration Legacy Infrastructure Transformation Project (Re-LiT), resulting in an in-year reduction of around £2.86m. Further reductions of between £3m–£4m are forecast in 2025/26 for the Record Digitisation project. This reflects the need to re-plan delivery in the context of affordability constraints, including changes to the approach previously agreed with the supplier.","wholeLifeCost":326.85,"costNarrative":"During FY 2025/26, the CReST Programme’s cost position was realigned to the approved whole-life cost baseline of £348.05m, as set out in the Programme Business Case approved in September 2025. This baseline incorporates the costs associated with the development and operation of new digital services, contracted scanning and transcription activity, and core programme delivery. The updated cost profile reflects a matured delivery plan, including the timetable for required legislative changes to enable digital registration, the sequencing of Registration Legacy Infrastructure Transformation Project (Re‑LiT) decommissioning activity, constraints associated with the Southport estate transition, and the latest confirmed critical path. There has been no material cost growth driven by changes in scope during the year; movements in cost primarily reflect the re-profiling of expenditure and increased forecast maturity rather than any increase in the overall programme envelope. Enhanced financial oversight during the year has strengthened alignment between delivery plans and financial forecasts. This has reduced the level of forecast underfunding from 9% at Q2 to 3% by Q4. This improvement was primarily driven by a £3.65m reduction in the funding gap associated with Record Digitisation, alongside a £2.86m deferral of Re‑LiT costs following an assurance-led re-baselining exercise prior to full delivery commitment. Re‑LiT is also exploring opportunities to reduce cost pressures in FY 2026/27 by transitioning elements of delivery and support from programme-funded solutions to centrally funded enterprise services, reducing duplication and reliance on bespoke arrangements. Ongoing departmental discussions regarding potential reductions to Capital allocations over the period 2026/27 to 2028/29 present a risk to future affordability. While in-year cost control remains effective, the programme continues to carry a moderate affordability risk in the outer years, driven by delivery dependencies and funding uncertainty rather than forecast overspend against the approved baseline.","benefits":320.18,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at £367M. This is primarily due to the following factors. Operational efficiencies throughout the Home Office and Local Registration Services (LRS), totalling approx. £45M per annum upon full realisation. Increase will be realised revenue via a new full service to the public. Further saving to be made where some commercial contacts are no longer required due to digitisation.","themes":["Delivery & schedule","Cost & funding","Commercial & supply chain","Approvals & decisions"],"evidenceExcerpt":"Compared with Q4 2024/25, the NISTA / SRO Delivery Confidence Assessment (DCA) rating for Q4 2025/26 remains Amber. This reflects a combination of continued delivery progress alongside ongoing risks and dependencies. There has been positive progress in the delivery of digital products and services, including strong uptake across Local Registration Services,…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"HO_0373_2425-Q1","year":2025,"name":"Civil Registration Service Transformation (CReST)","department":"HO","category":"Government Transformation and Service Delivery","description":"The programme will enable improvements within the General Register Office (GRO) for England and Wales’ delivery of its statutory service obligations; the Home Office and the Government’s wider digital identity ambitions, and the provisions within new legislative instruments for the modernisation of services.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER. This is due to‚ The AMBER rating is reflects the positive progress made to date, whilst also reflecting current challenges and changes needed to continue to drive further progress, pace and efficiency through programme delivery. The Programme team have a high degree of confidence that the programme is on track to deliver against its objectives by the current forecast closure date in 2030, which is a pressing deadline linked to Estates changes required in respect of the General Register Office (GRO) Estate, in line with the Home Office estates strategy. However, the amber rating reflects the critical dependencies on key enabling legislative change timelines, the level of complexity involved in replacing legacy infrastructure both pre and post-legislative change, current year financial pressures and the current business case and underpinning delivery plan pending formal Investment Committee approval; and the risks currently being managed in respect of those pressures and challenges.","startDate":"2024-04-26","endDate":"2030-03-29","scheduleNarrative":"The project's end-date at 24/25-Q4 is scheduled to be 29/03/2030. This is primarily due to the following factors‚ Civil registration is a core national function of any society which underpins basic identity and prevents abuse of deceased identities. In England and Wales, civil registration is supported by a multitude of ageing systems used by the General Register Office (GRO) & Local Registration Service (LRS) on behalf of the Registrar General for England and Wales. The age of the current civil registration services and systems continue to cause instability and risk outages that impact business continuity. The systems have been updated several times over the last two decades in response to changing circumstances and new legislation. In each year that passes, the risk of incidents and outages increases, and this poses a significant risk to the business and to government. Further, there is a heavy reliance on equipment that is no longer readily available from the commercial market, and GRO records stored on microfilm tapes are degrading beyond use. The current position is not sustainable. GRO for England and Wales is a Home Office (HO) responsibility; the HO must ensure the system of civil registration continues to function effectively and that GRO and the LRS can carry out their statutory functions. Therefore, this programme which started in April 2022 aims to replace the legacy business critical systems, digitise registration records, and provide digital life event registration options for users in the future as new legislation is laid. At InvestCo in May 24, the programme was directed to include decommissioning of more than 20 smaller legacy systems that had previously been out of scope. A dedicated project, Registration Legacy Infrastructure Transformation Project (Re-Lit), has been set up to take forward suitable options. In addition, an initiative to improve Home Office Estates sustainability has created a new timing pressure. This programme must now complete prior to the decommissioning of the Smedley Hydro site in Southport, where legacy systems servers and microfilms are housed. The site is to be decommissioned by March 2030, which is a fixed deadline.","fyBaseline":28.07,"fyForecast":28.66,"fyVariance":2.1,"varianceNarrative":"The budget variance is less than or equal to 5%. The in-year variance reflects a Full Year Actual of £21.22 million against a budget allocation of £19.77 million (this included 1.27m from Department of Health and Social Care (DHSC) and 4.2m from GDS) , resulting in an overspend of approximately 7.3%. However, the programme had formal Investment Committee (InvestCo) approval to spend up to £25.7 million in 2024/25, and the variance against the allocated budget was anticipated. The lower-than-approved spend was primarily due to the implementation of a rectification plan and a revised Statement of Work (SOW) for the scanning and transcription workstream, which reduced expenditure in this area. The overspend against the allocated budget was anticipated and was absorbed through wider savings identified within the Migration & Borders portfolio, ensuring that the programme remained within the overall approved funding envelope and did not pose a financial risk to the department.","wholeLifeCost":235.66,"costNarrative":"The project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) is 235. This is primarily due to the following factors‚ The baseline Whole Life Cost (WLC) of £235 million was established following the merger of two previously approved programmes – one focused on replacing core civil registration systems, and the other on scanning and transcribing historical records. The decision to combine them was made to streamline governance, improve delivery alignment, and maximise benefits realisation. This figure reflects a detailed reassessment of scope, delivery timelines, and resource requirements as part of the revised Programme Business Case. The WLC includes estimated costs for digital system development, scanning activities, and infrastructure replacement but excludes decommissioning costs, which are being considered separately. This figure excludes the cost of future decommissioning work, which is expected to be scoped and costed separately. The updated baseline was agreed during the department’s internal assurance process and supported by the Internal Quality Assurance (IQA) review that enabled the programme’s entry into the Government Major Projects Portfolio (GMPP) in 2024/25.","benefits":367.92,"benefitsNarrative":"The project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) is 367. This is primarily due to the following factors, Operational efficiencies throughout the HO and the LRS, totalling approx. £45M per annum upon full realisation. Increased will be realised revenue via a new full service to the public. Further saving to be made where some commercial contacts are no longer required due to digitisation.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER. This is due to‚ The AMBER rating is reflects the positive progress made to date, whilst also reflecting current challenges and changes needed to continue to drive further progress, pace and efficiency through programme delivery. The Programme team have a high…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"HO_0373_2425-Q1","year":2026,"name":"Civil Registration Service Transformation (CReST)","department":"HO","category":"Government Transformation and Service Delivery","description":"The programme will enable improvements within the General Register Office (GRO) for England and Wales delivery of its statutory service obligations; the Home Office and the Government’s wider digital identity ambitions, and the provisions within new legislative instruments for the modernisation of services.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared with Q4 2024/25, the NISTA / SRO Delivery Confidence Assessment (DCA) rating for Q4 2025/26 remains Amber. This reflects a combination of continued delivery progress alongside ongoing risks and dependencies. There has been positive progress in the delivery of digital products and services, including strong uptake across Local Registration Services, with the Death Registration Service now live in all districts. However, delays relating to key digital infrastructure dependencies have impacted overall progress. Challenges with the quality of record transcription have required a reassessment of the Record Digitisation project’s scope and delivery approach. The Programme Board has agreed that this is an appropriate point to review requirements, with the intention of re-procuring within the next 12 months. This approach is expected to enable the programme to take advantage of emerging technologies, including artificial intelligence, to improve digitisation outcomes and value for money. As a result, timelines for record digitisation are expected to extend to accommodate this re-procurement activity. The Registration Legacy Infrastructure Transformation Project has continued to progress well, including the successful completion of a proof of concept to transition services onto a single site. This is expected to help alleviate estate-related pressures within the General Register Office (GRO), with the potential for this phase of the project to be delivered ahead of schedule.","startDate":null,"endDate":"2030-08-15","scheduleNarrative":"Compared with Q4 2024/25, the project’s end date at Q4 2025/26 remains unchanged at 29 March 2030. This reflects a broadly stable delivery trajectory, alongside evolving scope and external constraints. Development of new services continues at pace, with key connectivity-related risks having been addressed. A Programme Board decision has been taken not to extend the existing XBP scanning and transcription contract. As a result, a re-procurement exercise will be required, and the programme will reassess the approach to record digitisation to align with its longer-term ambitions. The programme continues to explore innovative approaches to deliver its objectives more effectively. Work is underway to inform business case development and delivery planning for 2026/27, with a focus on identifying clear implementation options that provide a robust basis for decision-making. These plans are being developed in close consideration of end user needs. Following direction at InvestCo in May 2024, the programme has incorporated the decommissioning of over 20 smaller legacy systems that were previously out of scope. A dedicated project—the Registration Legacy Infrastructure Transformation Project (Re-LiT)—was established to deliver this activity. Early progress has been positive, with initial objectives expected to be delivered ahead of schedule and within budget, contributing to the management of wider programme financial pressures.","fyBaseline":51.88,"fyForecast":39.24,"fyVariance":24.37,"varianceNarrative":"The budget variance exceeds 5%, reflecting a combination of delivery rephasing and funding constraints. Since approval of the Programme Business Case (PBC) in September, the programme is forecasting an in-year reduction of approximately 20%. This is partly driven by delays to the Registration Legacy Infrastructure Transformation Project (Re-LiT), resulting in an in-year reduction of around £2.86m. Further reductions of between £3m–£4m are forecast in 2025/26 for the Record Digitisation project. This reflects the need to re-plan delivery in the context of affordability constraints, including changes to the approach previously agreed with the supplier.","wholeLifeCost":326.85,"costNarrative":"During FY 2025/26, the CReST Programme’s cost position was realigned to the approved whole-life cost baseline of £348.05m, as set out in the Programme Business Case approved in September 2025. This baseline incorporates the costs associated with the development and operation of new digital services, contracted scanning and transcription activity, and core programme delivery. The updated cost profile reflects a matured delivery plan, including the timetable for required legislative changes to enable digital registration, the sequencing of Registration Legacy Infrastructure Transformation Project (Re‑LiT) decommissioning activity, constraints associated with the Southport estate transition, and the latest confirmed critical path. There has been no material cost growth driven by changes in scope during the year; movements in cost primarily reflect the re-profiling of expenditure and increased forecast maturity rather than any increase in the overall programme envelope. Enhanced financial oversight during the year has strengthened alignment between delivery plans and financial forecasts. This has reduced the level of forecast underfunding from 9% at Q2 to 3% by Q4. This improvement was primarily driven by a £3.65m reduction in the funding gap associated with Record Digitisation, alongside a £2.86m deferral of Re‑LiT costs following an assurance-led re-baselining exercise prior to full delivery commitment. Re‑LiT is also exploring opportunities to reduce cost pressures in FY 2026/27 by transitioning elements of delivery and support from programme-funded solutions to centrally funded enterprise services, reducing duplication and reliance on bespoke arrangements. Ongoing departmental discussions regarding potential reductions to Capital allocations over the period 2026/27 to 2028/29 present a risk to future affordability. While in-year cost control remains effective, the programme continues to carry a moderate affordability risk in the outer years, driven by delivery dependencies and funding uncertainty rather than forecast overspend against the approved baseline.","benefits":320.18,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at £367M. This is primarily due to the following factors. Operational efficiencies throughout the Home Office and Local Registration Services (LRS), totalling approx. £45M per annum upon full realisation. Increase will be realised revenue via a new full service to the public. Further saving to be made where some commercial contacts are no longer required due to digitisation.","themes":["Delivery & schedule","Cost & funding","Commercial & supply chain","Approvals & decisions"],"evidenceExcerpt":"Compared with Q4 2024/25, the NISTA / SRO Delivery Confidence Assessment (DCA) rating for Q4 2025/26 remains Amber. This reflects a combination of continued delivery progress alongside ongoing risks and dependencies. There has been positive progress in the delivery of digital products and services, including strong uptake across Local Registration Services,…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"HO_0373_2425-Q1","year":2025,"name":"Civil Registration Service Transformation (CReST)","department":"HO","category":"Government Transformation and Service Delivery","description":"The programme will enable improvements within the General Register Office (GRO) for England and Wales’ delivery of its statutory service obligations; the Home Office and the Government’s wider digital identity ambitions, and the provisions within new legislative instruments for the modernisation of services.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER. This is due to‚ The AMBER rating is reflects the positive progress made to date, whilst also reflecting current challenges and changes needed to continue to drive further progress, pace and efficiency through programme delivery. The Programme team have a high degree of confidence that the programme is on track to deliver against its objectives by the current forecast closure date in 2030, which is a pressing deadline linked to Estates changes required in respect of the General Register Office (GRO) Estate, in line with the Home Office estates strategy. However, the amber rating reflects the critical dependencies on key enabling legislative change timelines, the level of complexity involved in replacing legacy infrastructure both pre and post-legislative change, current year financial pressures and the current business case and underpinning delivery plan pending formal Investment Committee approval; and the risks currently being managed in respect of those pressures and challenges.","startDate":"2024-04-26","endDate":"2030-03-29","scheduleNarrative":"The project's end-date at 24/25-Q4 is scheduled to be 29/03/2030. This is primarily due to the following factors‚ Civil registration is a core national function of any society which underpins basic identity and prevents abuse of deceased identities. In England and Wales, civil registration is supported by a multitude of ageing systems used by the General Register Office (GRO) & Local Registration Service (LRS) on behalf of the Registrar General for England and Wales. The age of the current civil registration services and systems continue to cause instability and risk outages that impact business continuity. The systems have been updated several times over the last two decades in response to changing circumstances and new legislation. In each year that passes, the risk of incidents and outages increases, and this poses a significant risk to the business and to government. Further, there is a heavy reliance on equipment that is no longer readily available from the commercial market, and GRO records stored on microfilm tapes are degrading beyond use. The current position is not sustainable. GRO for England and Wales is a Home Office (HO) responsibility; the HO must ensure the system of civil registration continues to function effectively and that GRO and the LRS can carry out their statutory functions. Therefore, this programme which started in April 2022 aims to replace the legacy business critical systems, digitise registration records, and provide digital life event registration options for users in the future as new legislation is laid. At InvestCo in May 24, the programme was directed to include decommissioning of more than 20 smaller legacy systems that had previously been out of scope. A dedicated project, Registration Legacy Infrastructure Transformation Project (Re-Lit), has been set up to take forward suitable options. In addition, an initiative to improve Home Office Estates sustainability has created a new timing pressure. This programme must now complete prior to the decommissioning of the Smedley Hydro site in Southport, where legacy systems servers and microfilms are housed. The site is to be decommissioned by March 2030, which is a fixed deadline.","fyBaseline":28.07,"fyForecast":28.66,"fyVariance":2.1,"varianceNarrative":"The budget variance is less than or equal to 5%. The in-year variance reflects a Full Year Actual of £21.22 million against a budget allocation of £19.77 million (this included 1.27m from Department of Health and Social Care (DHSC) and 4.2m from GDS) , resulting in an overspend of approximately 7.3%. However, the programme had formal Investment Committee (InvestCo) approval to spend up to £25.7 million in 2024/25, and the variance against the allocated budget was anticipated. The lower-than-approved spend was primarily due to the implementation of a rectification plan and a revised Statement of Work (SOW) for the scanning and transcription workstream, which reduced expenditure in this area. The overspend against the allocated budget was anticipated and was absorbed through wider savings identified within the Migration & Borders portfolio, ensuring that the programme remained within the overall approved funding envelope and did not pose a financial risk to the department.","wholeLifeCost":235.66,"costNarrative":"The project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) is 235. This is primarily due to the following factors‚ The baseline Whole Life Cost (WLC) of £235 million was established following the merger of two previously approved programmes – one focused on replacing core civil registration systems, and the other on scanning and transcribing historical records. The decision to combine them was made to streamline governance, improve delivery alignment, and maximise benefits realisation. This figure reflects a detailed reassessment of scope, delivery timelines, and resource requirements as part of the revised Programme Business Case. The WLC includes estimated costs for digital system development, scanning activities, and infrastructure replacement but excludes decommissioning costs, which are being considered separately. This figure excludes the cost of future decommissioning work, which is expected to be scoped and costed separately. The updated baseline was agreed during the department’s internal assurance process and supported by the Internal Quality Assurance (IQA) review that enabled the programme’s entry into the Government Major Projects Portfolio (GMPP) in 2024/25.","benefits":367.92,"benefitsNarrative":"The project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) is 367. This is primarily due to the following factors, Operational efficiencies throughout the HO and the LRS, totalling approx. £45M per annum upon full realisation. Increased will be realised revenue via a new full service to the public. Further saving to be made where some commercial contacts are no longer required due to digitisation.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER. This is due to‚ The AMBER rating is reflects the positive progress made to date, whilst also reflecting current challenges and changes needed to continue to drive further progress, pace and efficiency through programme delivery. The Programme team have a high…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":139,"attentionScore":34,"attentionReasons":["Current published delivery confidence is Amber","Published end date moved 139 days later","In-year forecast variance is +24.4%"]},{"id":"MOJ_0061_2122-Q3","year":2026,"name":"Decommission and Legacy Risk Migration (DLRM)","department":"MOJ","category":"Information and Communications Technology (ICT)","description":"The Decommissioning and Legacy Risk Mitigation (DLRM) Programme has been established to mitigate the risks presented by HMCTS legacy technology. The DLRM Programme will retire aged and unused applications and update and migrate existing applications to supported hosting environments","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is driven primarily due to continued delivery risk driven by complex design challenges.","startDate":"2021-07-01","endDate":"2028-09-30","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 changed from 31/03/28 to 30/09/28. This is primarily due to the programme allowing additional time to ensure a full closure process is completed.","fyBaseline":45.51,"fyForecast":36.81,"fyVariance":19.12,"varianceNarrative":"The budget variance exceeds 5%. The underspend is due to reduced in-year activities requiring costs to be re-profiled into future years.","wholeLifeCost":273.28,"costNarrative":"Compared to financial year 24/25-Q4, the project's Whole Life Cost at 25/26-Q4 reduced to £273.28m. The Whole Life Cost remains aligned to the current baseline business case. All costs have been reported in 2024/25 base prices in line with NISTA requirements. This is a change from previous years where costs were reported in nominal prices. All costs reflect this accounting reduction regardless of any actual changes.","benefits":null,"benefitsNarrative":"The project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) is 0. This project currently reports no monetised benefits. The project's benefits focus on reducing the risk of legacy technology through decommission, transition and replacement.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is driven primarily due to continued delivery risk driven by complex design challenges. Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 changed from 31/03/28 to 30/09/28. This is primarily due to the…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"MOJ_0061_2122-Q3","year":2022,"name":"HMCTS Decommission and Legacy Risk Mitigation (DLRM) Programme","department":"MOJ","category":"ICT","description":"The Decommission and Legacy Risk Mitigation (DLRM) Programme has been established to mitigate the risks presented by HMCTS' legacy technology. The DLRM Programme will retire aged and unsued applications where possible and for those applications still required it will update the application and migrate it to supported hosting environments.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Senior Responsible Owner Delivery Confidence Assessment rating at 21/22-Q4 is Amber. This is the first time data has been published for this project, which has been added to GMPP over the last year. The DCA is Amber primarily due to the following factors: Complexity relating to how live data is migrated and the significant volume of commercial and procurement activity that needs to be delivered in a short timeframe.","startDate":"2021-07-01","endDate":"2028-03-31","scheduleNarrative":"Your project end-date is 31 MAR 2028. This is primarily due to the following factors: The project is on track for completion by March 2028.","fyBaseline":12.21,"fyForecast":11.05,"fyVariance":-10.0,"varianceNarrative":"The variance is due to a revised procurement approach which resulted in the contract award being delayed and moving to FY2022/23 (£0.7m); running costs associated with that contract were also delayed (£0.2m). The remainder is slippage within one of the workstreams (£0.2m).","wholeLifeCost":198.0,"costNarrative":"Your projects Baseline Whole Life Cost is 197.91 (£m). This is primarily due to the following factors: Whole life cost is on track for £197.91m","benefits":null,"benefitsNarrative":"","themes":["Commercial & supply chain","Cost & funding","Delivery & schedule","Technical & integration"],"evidenceExcerpt":"The Senior Responsible Owner Delivery Confidence Assessment rating at 21/22-Q4 is Amber. This is the first time data has been published for this project, which has been added to GMPP over the last year. The DCA is Amber primarily due to the following factors: Complexity relating to how live data is migrated and the significant volume of commercial and…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"MOJ_0061_2122-Q3","year":2023,"name":"Decommission and Legacy Risk Mitigation (DLRM)","department":"MOJ","category":"ICT","description":"The Decommission and Legacy Risk Mitigation (DLRM) Programme has been established to mitigate the risks presented by HMCTS legacy technology. The DLRM Programme will retire aged and unused applications where possible and for those applications still required it will update the application and migrate it to supported hosting environments.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 21/22-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. Compared to 21/22 Q4, the project's Delivery Confidence Assessment rating remained Amber.The Amber assessment is due tocomplexity risks in the migration of live data. The programme has exceeded its Year 1 target.","startDate":"2021-07-01","endDate":"2028-03-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2028-03-31. This is primarily due to the following factors. The project remains on track for completion in line with the current baseline schedule.","fyBaseline":51.53,"fyForecast":27.15,"fyVariance":-47.0,"varianceNarrative":"Underspend in 22-23 arises from the project not needing to call on contingency and optimism bias and reduction of costs more generally, with a small level of slippage into 2023-24. The programme remains on track and exceeded milestones set. The reduction in cost of the programme does not affect the delivery of the overall programme core milestones, which remain affordable.","wholeLifeCost":198.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 remained at 198m. This is primarily due to the following factors. The Whole Life Cost has remained static, and the budget remains aligned to the current baseline business case.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This project currently reports no monetised benefits. The project benefits focus on reducing the risk of legacy technology through decommission, transition and replacement.","themes":["Cost & funding","Delivery & schedule","Technical & integration","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. Compared to 21/22 Q4, the project's Delivery Confidence Assessment rating remained Amber.The Amber assessment is due tocomplexity risks in the migration of live data. The…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"MOJ_0061_2122-Q3","year":2024,"name":"Decommission and Legacy Risk Mitigation (DLRM)","department":"MOJ","category":"ICT","description":"The Decommission and Legacy Risk Mitigation (DLRM) Programme has been established to mitigate the risks presented by HMCTS legacy technology. The DLRM Programme will retire aged and unused applications where possible and for those applications still required it will update the application and migrate it to supported hosting environments.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. Data migration issues impacting timelines.","startDate":"2021-07-01","endDate":"2028-03-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2028-03-31. This is primarily due to the following factors. The project is on track to deliver against the baseline schedule.","fyBaseline":55.39,"fyForecast":48.63,"fyVariance":-12.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The underspend is due to the project not needing to call on cost contingency included in the baseline budgets.","wholeLifeCost":199.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 increased from 198m. to 199m. This is primarily due to the following factors. The Whole Life Cost has remained largely static, and the budget remains aligned to the current baseline business case.","benefits":0.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 0m. This project currently reports no monetised benefits. The project's benefits focus on reducing the risk of legacy technology through decommission, transition and replacement.","themes":["Cost & funding","Delivery & schedule","Technical & integration","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. Data migration issues impacting timelines. Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2028-03-31. This is…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"MOJ_0061_2122-Q3","year":2025,"name":"Decommission and Legacy Risk Migration (DLRM)","department":"MoJ","category":"ICT","description":"The Decommission and Legacy Risk Mitigation (DLRM) Programme has been established to mitigate the risks presented by HMCTS legacy technology. The DLRM Programme will retire aged and unused applications where possible and for those applications still required it will update the application and migrate it to supported hosting environments.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER. This is due to‚ Data migration issues impacting timelines.","startDate":"2021-07-01","endDate":"2028-03-31","scheduleNarrative":"The project's end-date at 24/25-Q4 is scheduled to be 31/03/2028. This is primarily due to the following factors‚ The project is on track to deliver against the baseline schedule.","fyBaseline":40.22,"fyForecast":38.84,"fyVariance":3.43,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":273.35,"costNarrative":"The project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) is 273. This is primarily due to the following factors‚ Complexity of legacy technology, and increased supplier costs partially driven by inflation.","benefits":0.0,"benefitsNarrative":"The project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) is 0. This is primarily due to the following factors‚ This project currently reports no monetised benefits. The project's benefits focus on reducing the risk of legacy technology through decommission, transition and replacement.","themes":["Cost & funding","Technical & integration","Commercial & supply chain","Delivery & schedule"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER. This is due to‚ Data migration issues impacting timelines. The project's end-date at 24/25-Q4 is scheduled to be 31/03/2028. This is primarily due to the following factors‚ The project is on track to deliver against the baseline schedule.","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"MOJ_0061_2122-Q3","year":2026,"name":"Decommission and Legacy Risk Migration (DLRM)","department":"MOJ","category":"Information and Communications Technology (ICT)","description":"The Decommissioning and Legacy Risk Mitigation (DLRM) Programme has been established to mitigate the risks presented by HMCTS legacy technology. The DLRM Programme will retire aged and unused applications and update and migrate existing applications to supported hosting environments","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is driven primarily due to continued delivery risk driven by complex design challenges.","startDate":"2021-07-01","endDate":"2028-09-30","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 changed from 31/03/28 to 30/09/28. This is primarily due to the programme allowing additional time to ensure a full closure process is completed.","fyBaseline":45.51,"fyForecast":36.81,"fyVariance":19.12,"varianceNarrative":"The budget variance exceeds 5%. The underspend is due to reduced in-year activities requiring costs to be re-profiled into future years.","wholeLifeCost":273.28,"costNarrative":"Compared to financial year 24/25-Q4, the project's Whole Life Cost at 25/26-Q4 reduced to £273.28m. The Whole Life Cost remains aligned to the current baseline business case. All costs have been reported in 2024/25 base prices in line with NISTA requirements. This is a change from previous years where costs were reported in nominal prices. All costs reflect this accounting reduction regardless of any actual changes.","benefits":null,"benefitsNarrative":"The project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) is 0. This project currently reports no monetised benefits. The project's benefits focus on reducing the risk of legacy technology through decommission, transition and replacement.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is driven primarily due to continued delivery risk driven by complex design challenges. Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 changed from 31/03/28 to 30/09/28. This is primarily due to the…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"MOJ_0061_2122-Q3","year":2025,"name":"Decommission and Legacy Risk Migration (DLRM)","department":"MoJ","category":"ICT","description":"The Decommission and Legacy Risk Mitigation (DLRM) Programme has been established to mitigate the risks presented by HMCTS legacy technology. The DLRM Programme will retire aged and unused applications where possible and for those applications still required it will update the application and migrate it to supported hosting environments.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER. This is due to‚ Data migration issues impacting timelines.","startDate":"2021-07-01","endDate":"2028-03-31","scheduleNarrative":"The project's end-date at 24/25-Q4 is scheduled to be 31/03/2028. This is primarily due to the following factors‚ The project is on track to deliver against the baseline schedule.","fyBaseline":40.22,"fyForecast":38.84,"fyVariance":3.43,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":273.35,"costNarrative":"The project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) is 273. This is primarily due to the following factors‚ Complexity of legacy technology, and increased supplier costs partially driven by inflation.","benefits":0.0,"benefitsNarrative":"The project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) is 0. This is primarily due to the following factors‚ This project currently reports no monetised benefits. The project's benefits focus on reducing the risk of legacy technology through decommission, transition and replacement.","themes":["Cost & funding","Technical & integration","Commercial & supply chain","Delivery & schedule"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER. This is due to‚ Data migration issues impacting timelines. The project's end-date at 24/25-Q4 is scheduled to be 31/03/2028. This is primarily due to the following factors‚ The project is on track to deliver against the baseline schedule.","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":183,"attentionScore":34,"attentionReasons":["Current published delivery confidence is Amber","Published end date moved 183 days later","In-year forecast variance is +19.1%"]},{"id":"MOD_0114_1718-Q1","year":2026,"name":"DEFENCE ESTATE OPTIMISATION","department":"MOD","category":"Military Capability","description":"Defence Estate Optimisation (DEO) Portfolio is a long-term investment of £5.1Bn to modernise the defence estate. It is an ambitious portfolio of construction activity, unit and personnel moves, and site disposals that will deliver a better structured, modern, and more sustainable estate to support military capability.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors. 1. The Delivery Confidence Assessment rating at the end of the financial year remains at AMBER, reflecting the complexity and long timeline of the Portfolio. Ongoing engagement with NISTA confirmed satisfaction with the close monitoring of activities, ongoing assessment of external events, and the adoption of previous review recommendations. 2. The governance structure, led by central Military Strategic Headquarters management, is clearly effective, supporting strong relationships and providing a defence-wide perspective. 3. Now in the delivery phase, the Portfolio has successfully implemented the Contract Permissioning Group (CPG), which has reduced standard approval timings to 5 weeks for Category A and 3 weeks for Category D and C projects. 4. Projects enter the strategic alliance framework within 1-2 weeks, cutting procurement timelines by up to 18 months. 5. The CPG delegated timeframe has concluded, and the Portfolio awaits the outcome of the Defence Implementation Plan before continuing the Review Note.","startDate":"2016-09-30","endDate":"2041-03-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 31/03/2041.","fyBaseline":480.66,"fyForecast":251.98,"fyVariance":47.58,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. 1. The delay in Defence Investment Plan read out and confirmation of any imposed measures has led to affordability confirmation delays for projects in scope. 2. The introduction of commitment controls for RDEL, CDEL and External Assistance has resulted in delays to placing projects on contract. With projects experiencing delays of several months in decision making. 3. Legal, commercial, financial and security challenges leading to delays. 4. Affordability challenges presented by some projects have necessitated a resubmission and reduction in scope to meet Affordability targets. 5. The new design and build contracting process has taken projects and suppliers longer than envisaged to navigate through the complex process. The above has resulted in project schedules being updated, changing funding profiles into future years.","wholeLifeCost":5949.19,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) increased from £6376.29M to £6385.83M. This is primarily due to the following factors. 1. The Defence Estate Optimisation budget has remained stable throughout FY25/26. The delay to the Defence Investment Plan read out has led to the portfolio to hold within its budget however, an increase in the while life costs is now forecast. 2. Options have been presented to continue to deliver to the current approved Whole Life Cost estimates, including a potential reduction in funding should the Defence Investment Plan conclude as such.","benefits":13085.8,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 21281.95. This is primarily due to the following factors. The Defence Estate Optimisation benefits remained steady as per V13. Following the Defence Implementation Plan outcome we expect to see some movement dependent on the settlement.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors. 1. The Delivery Confidence Assessment rating at the end of the financial year remains at AMBER, reflecting the complexity and long timeline of the Portfolio. Ongoing engagement with…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"MOD_0114_1718-Q1","year":2020,"name":"Defence Estate Optimisation","department":"MOD","category":"Military Capability","description":"Helping create a smaller, better and a more efficient estate to deliver the required Military Capability.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber/Red, which has not changed since last year�s Q2 1819 Amber/Red, due primarily to the following factors; - The abolition of PF2 as a funding source as a result of changes to the Private Funding rules by HMT. Subsequent clarification from Treasury indicates that opportunities for the use of private finance within government are limited and will most likely score �on balance sheet� and require the provision of capital budget. - The impact on delivery of the DEO Portfolio with the transition from the DIO Strategic Business Partner (SBP) to Civil Service leadership and Client Side Partner (CSP). The risk from the handover of responsibilities was partly mitigated through extending the contracts of some delivery staff in key roles but required the onboarding of circa 100 civil servant and contractor staff in the last 12 months. This is providing required resource in both Project delivery and supporting Programme Management, Commercial and Technical functions. - DEO portfolio has been reviewed and revised to align delivery plans with financial planning in ABC20 through a rebaselining exercise. This was undertaken collaboratively between DIO, TLB's and FMC to ensure full transparency of content, schedule and financial implications. Since the Q2 1920 (30th September 2019) Amber/Red IPA DCA, the following non-project operating environment activities have impacted the original Q2 IPA DCA; - Capacity of suppliers remains a concern given high numbers of major Gov Infra Prog's and Defence Proj. Comms strategy for extensive Assessment Study activity has been developed for review and signoff. A Request for Information was issued to Industry. - The arrangement/Invitation to Tender (ITT) for financial support (Private Finance Technical Support - PFTS) has been temporarily paused, required in May 2020. CCS to award a Construction Capital works Framework in Autumn, DIO to fully mobilise by Q1 20/21. Engagement with Treasury on alternate (PF) funding options continues, led by the SRO.","startDate":"2016-11-01","endDate":"2041-03-31","scheduleNarrative":"The scheduled baseline project end date at Q2 1920 (30th September 2019) is 31/03/41, has not changed since last year's Q2 1819 date of 31/03/41, due primarily to the following factors; - No Change - The Portfolio will be delivered in sequential waves: PF and Wave 1 then Wave 2 and possibly then some of Wave 3. Wave 2 onwards is funded from the receipts of the preceding wave so rely on timeliness of delivery and overall receipts generated. Wave 2 onwards are therefore a series of candidate projects that will be matured, programmed and delivered as confidence in the preceding waves improves.","fyBaseline":19.37,"fyForecast":11.75,"fyVariance":-39.0,"varianceNarrative":"The 19/20 in-year baseline / forecast variance at Q2 1920 (30th September 2019) of -39%, is due primarily to the following factors; - Schedule changes resulting from re-programming activity have impacted expected delivery of Portfolio activity; in particular, the commencement of assessment studies, tendering for infrastructure solutions and construction - Contracts to obtain industry technical support for the development and delivery of site disposals, have been tendered and mobilised more slowly than anticipated. Overall disposals have not been impacted. Since the Q2 1920 (30th September 2019) 19/20 in-year baseline / forecast variance of -39%, the following primary project actions have impacted the original Q2 19/20 in-year variance; - We have re-baselined the schedule to take account of approval timelines to improve cost estimating and profiling. - We have utilised our industry partner to introduce an assessment study model that improves cost estimating accuracy and profiling - We have standardised the approach to business case submissions and stakeholder management leading to smoother and timely approvals","wholeLifeCost":1754.74,"costNarrative":"The baseline Whole Life Cost at Q2 1920 (30th September 2019) is �1,754.74 m, has increased by �587.87 m since last year's Q2 1819 (�m) baseline Whole Life Cost of �1,166.87 m, due primarily to the following factors; - Increase to the Budget Line for PF2 within the v8 baseline to reflect additional PF cost requirements that had not been captured within v6 (as reported at Q2 18/19). Please note that the V8 baseline pre-dated PF2 withdrawal. - Increase in the budget provision to enable preliminary/feasibility studies and to procure private sector expertise to develop and deliver disposals and a Private Finance 2 (PF2) pipeline. Since the Q2 1920 (30th September 2019) �1,754.74 m baseline Whole Life Cost, the following primary project actions have impacted the original Q2 baseline Whole Life Cost; - We have undertaken a series of procurements to obtain industry support to develop and deliver DEO. - We have revised the DEO Portfolio budget profile as the baseline requirement has evolved.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Workforce & capability","Technical & integration"],"evidenceExcerpt":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber/Red, which has not changed since last year�s Q2 1819 Amber/Red, due primarily to the following factors; - The abolition of PF2 as a funding source as a result of changes to the Private Funding rules by HMT. Subsequent clarification from Treasury indicates that…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2020","sourceLabel":"IPA Annual Report 2019-20"},{"id":"MOD_0114_1718-Q1","year":2021,"name":"Defence Estate Optimisation","department":"MOD","category":"Military Capability","description":"Defence Estates Optimisation�is a long-term investment to modernise the defence estate. It is an ambitious 25-year portfolio of construction activity, unit and personnel moves, and site disposals that will deliver a better structured, more economical and modern estate that more effectively supports military capability.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber/red. This is primarily due to the following factors: The Departmental Integrated Review has provided a clear capability requirement and resolved the Defence Estate Optimisation funding shortfall. This should increase the assessment from Amber/Red to Amber. The portfolio is now planning to restructure it's operating model to take forward the outcomes from the review.","startDate":"2016-09-30","endDate":"2041-03-31","scheduleNarrative":"Compared to financial year 19/20-Q2, the project's end-date remained scheduled to finish on 31 March 2041 . This is primarily due to the following factors: There are a number of reasons for schedule changes (both positive and negative) across the portfolio since the last Annual Report of Major Projects (Q2 2019). During this period of time the portfolio has updated its operational Performance Measurement Baseline on two occasions in March 2020 and December 2020. The significant driving factor for the December 2020 baseline change was to consolidate changes from Infrastructure Optimisation, the Team responsible for reviewing the capacity on re-provision sites, and establish a programme baseline to measure progress against. The December 2020 baseline update captured significant programme changes that had been identified, most notably (i) capture changes from the Army War Gaming exercise in Q2 2020, (ii) significant scope changes i.e. removal of Aspirational Wave from programme, (iii) Alignment to Annual Budgetry Cycle 21 / Infrastructure Review Planning Costs 3 forecasts (iv) general project / programme maturity changes identified though Assessment Studies, or through the Portfolio Change Process.","fyBaseline":47.1,"fyForecast":46.22,"fyVariance":-2.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":1266.33,"costNarrative":"Compared to financial year 19/20-Q2, the projects Baseline Whole Life Cost increased from �1166.85m to �1266.33m. This is primarily due to the following factors: Q2 19/20 was based on Version 8 of the baseline, whilst Q4 20/21 reflects activity undertaken related to Version 10.2. Specifically focusing on the changes to the Whole Life Cost there are 2 Key Factors: 1. Defence Estates Optimisation portfolio scope changed, principally the Rotary (helicopter) programme has been removed from the Aspirational Wave from the portfolio, this had an approximate value of �1.7Bn. 2. The removal of Private Finance has resulted in a reduction in Resource Departmental Expenditure Limits�as the Unitary Charge no longer applies. The Capital Departmental Expenditure Limits demand has increased as a result of the On-Balance sheet accounting treatment but this is offset by the removal of Rotary (helicopter) referenced previously.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber/red. This is primarily due to the following factors: The Departmental Integrated Review has provided a clear capability requirement and resolved the Defence Estate Optimisation funding shortfall. This should increase the…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21"},{"id":"MOD_0114_1718-Q1","year":2022,"name":"Defence Estate Optimisation","department":"MOD","category":"Military Capability","description":"Defence Estates Optimisation is a long-term investment to modernise the defence estate. It is an ambitious 25-year portfolio of construction activity, unit and personnel moves, and site disposals that will deliver a better structured, more economical and modern estate that more effectively supports military capability.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating decreased from Amber/Red to Amber. This is primarily due to the following factors: The removal of the incremental Amber/Red and Amber Green assessment rating. The new Delivery Commercial and Procurement Strategy as the preferred method of procurement, will enable an efficient framework alliance contract and embeds 2 stage procurement. This is still waiting final approval.","startDate":"2016-09-30","endDate":"2041-03-31","scheduleNarrative":"Compared to 2021-Q4, the project end-date remained scheduled to finish on 31 March 41.","fyBaseline":82.71,"fyForecast":71.12,"fyVariance":-13.0,"varianceNarrative":"The budget variance exceeds 5%. During FY 20/21 the Defence Estates Optimisation Portfolio was re-baselined and budget amended to reflect the Spending Review outcome and COVID-19 impacts, therefore there is no longer an affordability issue except for the aspirational projects such as disposal or relocation of existing unit locations. These will be further considered as part of the work to develop a new baseline together with the outcomes expected from the Integrated Review. This revised baseline will be generated during FY 22/23.","wholeLifeCost":5394.0,"costNarrative":"Compared to 2021-Q4, the projects Baseline Whole Life Costs increased from 1266.33 (£m) to 5393.69 (£m). The remaining whole life variance is predominantly due to the remaining element of the Aspirational projects which did not form part of the Spending Review proposition and as part of the re-baselining exercise. Defence is considering whether these projects remain a viable proposition for this portfolio.","benefits":null,"benefitsNarrative":"","themes":["Commercial & supply chain","Cost & funding","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating decreased from Amber/Red to Amber. This is primarily due to the following factors: The removal of the incremental Amber/Red and Amber Green assessment rating. The new Delivery Commercial and Procurement Strategy as the preferred method of…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"MOD_0114_1718-Q1","year":2023,"name":"Defence Estate Optimisation","department":"MOD","category":"Military Capability","description":"Defence Estate Optimisation Portfolio is a long-term investment of 5.1Bn to modernise the defence estate. It is an ambitious portfolio of construction activity; unit and personnel moves; and site disposals that will deliver a better structured; modern; and more sustainable estate to support military capability.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber (SRO rating). This is primarily due to the following factors. Recognition of the long complex timeline of the Portfolio, which is now maturing swiftly into the delivery phase. The impact of cost growth driven by emerging net zero sustainability requirements in addition to the construction industry inflation are currently being assessed.","startDate":"2016-09-30","endDate":"2041-03-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2041-03-31. This is primarily due to the following factors. NA","fyBaseline":97.47,"fyForecast":51.3,"fyVariance":-47.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors: 1. A change in the commercial approach regarding Service Family Accommodation purchases, has resulted in a reduction of an in-year spend opportunity. 2. The adoption of the new Delivery Commercial Procurement Strategy throughout the programme has resulted in in-year funding being allocated into future years; in line with the new approach to design and build. While funding has been reprofiled in line with new build stages; in service dates remain extant.","wholeLifeCost":5438.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 increased from 5394m. to 5438m. This is primarily due to the following factors. Following the Integrated Review and the Future Soldier Programme, the Programme has been rebaselined and endorsed by the Portfolio Board and programme schedules updated. Following the schedule amendments, budgets have been realigned. This has resulted in a reduction in resource costs including removal of the need for Private Finance, offset by an increase in construction costs driven by the increase in the indices rates used to apply inflation.","benefits":5466.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 5466m. Disposal receipts received for vacated sites, reduced infrastructure running costs at vacated sites and avoidance of lifecycle replacement costs at vacated sites.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber (SRO rating). This is primarily due to the following factors. Recognition of the long complex timeline of the Portfolio, which is now maturing swiftly into the delivery phase. The impact of cost growth driven by emerging net zero sustainability…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"MOD_0114_1718-Q1","year":2024,"name":"Defence Estate Optimisation","department":"MOD","category":"Military Capability","description":"Defence Estate Optimisation (DEO) Portfolio is a long-term investment of 5.1bn to modernise the defence estate. It is an ambitious portfolio of construction activity, unit and personnel moves; and site disposals that will deliver a better structured, modern, and more sustainable estate to support military capability.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure and Projects Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. An IPA review in January 2024 confirmed the Review Team were “satisfied with the close monitoring of Portfolio activities underway, continued monitoring of external events affecting the Portfolio and the adoption of previous recommendations.”. It was recognised that the “governance structure based around central management was clearly working well and supports strong working relationships while providing a defence wide perspective and is a key driver for the current and future success”. The Portfolio is now in the delivery phase, successfully implementing the Contract Permissioning Group (CPG), designed to improve the efficiency and pace of approvals, and reduce procurement timeline for projects by up to 18 months.","startDate":"2016-09-30","endDate":"2041-03-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the programme's end-date at 23/24-Q4 remained scheduled to finish on 2041-03-31. The portfolio has been re-baselined but the overall completion date has not been impacted.","fyBaseline":159.316,"fyForecast":105.757,"fyVariance":-33.618,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The adoption and refinement of project delivery under the new Delivery Commercial Procurement Strategy throughout Defence Estate Optimisation has resulted in in-year funding being allocated into future years, in line with the new approach to design and build. Additionally there have been legal, commercial and security challenges leading to delays due to changes in procurement strategy and design scope. Resulting in a reprofile of spend into future years.","wholeLifeCost":5208.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 decreased from 5438m to 5208m. This is primarily due to the following factors. Last year’s budget was set against Portfolio Baseline Version 11. The Defence Estate Optimisation budgets have been realigned to Version 12, which now includes the adoption of the new Delivery Commercial Procurement Strategy and endorsed by the Portfolio Board. As such programme schedules have been updated to align with this framework. The outcome has been the reprofiling of projects across the portfolio, culminating in reduced costs overall.","benefits":17656.0,"benefitsNarrative":"At financial year 23/24-Q4, the projected departmental benefits were 17656m. This is primarily due to the following factors. Disposal receipts received from disposed sites, reduced infrastructure running costs and avoidance of lifecycle replacement costs at vacated sites together with the removal of projects from the portfolio.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure and Projects Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. An IPA review in January 2024 confirmed the Review Team were “satisfied with the close monitoring of Portfolio activities underway, continued monitoring of…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"MOD_0114_1718-Q1","year":2025,"name":"DEFENCE ESTATE OPTIMISATION","department":"MoD","category":"Military Capability","description":"Defence Estate Optimisation Portfolio is a long-term investment of £5.1Bn to modernise the defence estate. It is an ambitious portfolio of construction activity, unit and personnel moves, and site disposals that will deliver a better structured, modern, and more sustainable estate to support military capability.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Project's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER, compared with the Infrastructure and Projects Authority's assessment last year of AMBER. This is due to the following factors. Compared to financial year 23/24-Q4, the NISTA Delivery Confidence Assessment rating at 24/25-Q4 remained at Amber. This is primarily due to the following factors: The programme's complexity and long timeline. Close monitoring of this suite of activities continues and is subject to a governance structure based around central Finance Military Capability management that is working well and supports strong working relationships while providing a defence wide perspective and is a key driver for the current and future success. The Portfolio is now in the delivery phase, successfully implementing the Contract Permissioning Group, designed to improve the efficiency and pace of approvals, enabling a reduction in standard approvals timing to 5-weeks. This framework will reduce the procurement timelines for projects by up to 18 months.","startDate":"2016-09-30","endDate":"2041-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2041.","fyBaseline":213.53,"fyForecast":193.56,"fyVariance":9.35,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The Defence Estate Optimisation in year variance, an overall underspend against its issued budget. This is due to the following main drivers: 1. The introduction of additional spending controls and lack of resource within commercial function has resulted in delays to placing projects on contract. 2. Additionally there have been legal, commercial and security challenges leading to delays. 3. The new design and build contracting process has taken projects and suppliers longer than envisaged to navigate through the complex process. 4. Affordability challenges presented by some projects have necessitated a resubmission and reduction in scope to meet Affordability targets. This has resulted in project schedules being updated, changing funding profiles into future years.","wholeLifeCost":6376.29,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 5208 to 6376. This is primarily due to the following factors. The Defence Estate Optimisation budgets have been realigned to V13 from V12 baseline. This has been endorsed by the Portfolio Board, resulting in increased Whole Life Total costs. This is partly due to additional spend controls, with initial projects and suppliers taking additional time adapting to the complexities of the new design and build contract process leading to further delays. Project costs for some sites have matured and been updated by the project teams as they were initially based on early estimates, leading to new cost models and increased scope due to refined stakeholder needs. Recent economic challenges like rising material, inflation, and labour costs have placed a further strain on the portfolio. Committing to evolving standards like Net Zero and carbon savings has compounded the case further.","benefits":21281.95,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 17656 to 21281. This is primarily due to the following factors.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Scope & requirements"],"evidenceExcerpt":"The Project's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER, compared with the Infrastructure and Projects Authority's assessment last year of AMBER. This is due to the following factors. Compared to financial year 23/24-Q4, the NISTA Delivery Confidence Assessment rating at 24/25-Q4 remained at Amber. This is primarily due to the following…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"MOD_0114_1718-Q1","year":2026,"name":"DEFENCE ESTATE OPTIMISATION","department":"MOD","category":"Military Capability","description":"Defence Estate Optimisation (DEO) Portfolio is a long-term investment of £5.1Bn to modernise the defence estate. It is an ambitious portfolio of construction activity, unit and personnel moves, and site disposals that will deliver a better structured, modern, and more sustainable estate to support military capability.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors. 1. The Delivery Confidence Assessment rating at the end of the financial year remains at AMBER, reflecting the complexity and long timeline of the Portfolio. Ongoing engagement with NISTA confirmed satisfaction with the close monitoring of activities, ongoing assessment of external events, and the adoption of previous review recommendations. 2. The governance structure, led by central Military Strategic Headquarters management, is clearly effective, supporting strong relationships and providing a defence-wide perspective. 3. Now in the delivery phase, the Portfolio has successfully implemented the Contract Permissioning Group (CPG), which has reduced standard approval timings to 5 weeks for Category A and 3 weeks for Category D and C projects. 4. Projects enter the strategic alliance framework within 1-2 weeks, cutting procurement timelines by up to 18 months. 5. The CPG delegated timeframe has concluded, and the Portfolio awaits the outcome of the Defence Implementation Plan before continuing the Review Note.","startDate":"2016-09-30","endDate":"2041-03-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 31/03/2041.","fyBaseline":480.66,"fyForecast":251.98,"fyVariance":47.58,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. 1. The delay in Defence Investment Plan read out and confirmation of any imposed measures has led to affordability confirmation delays for projects in scope. 2. The introduction of commitment controls for RDEL, CDEL and External Assistance has resulted in delays to placing projects on contract. With projects experiencing delays of several months in decision making. 3. Legal, commercial, financial and security challenges leading to delays. 4. Affordability challenges presented by some projects have necessitated a resubmission and reduction in scope to meet Affordability targets. 5. The new design and build contracting process has taken projects and suppliers longer than envisaged to navigate through the complex process. The above has resulted in project schedules being updated, changing funding profiles into future years.","wholeLifeCost":5949.19,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) increased from £6376.29M to £6385.83M. This is primarily due to the following factors. 1. The Defence Estate Optimisation budget has remained stable throughout FY25/26. The delay to the Defence Investment Plan read out has led to the portfolio to hold within its budget however, an increase in the while life costs is now forecast. 2. Options have been presented to continue to deliver to the current approved Whole Life Cost estimates, including a potential reduction in funding should the Defence Investment Plan conclude as such.","benefits":13085.8,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 21281.95. This is primarily due to the following factors. The Defence Estate Optimisation benefits remained steady as per V13. Following the Defence Implementation Plan outcome we expect to see some movement dependent on the settlement.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors. 1. The Delivery Confidence Assessment rating at the end of the financial year remains at AMBER, reflecting the complexity and long timeline of the Portfolio. Ongoing engagement with…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"MOD_0114_1718-Q1","year":2025,"name":"DEFENCE ESTATE OPTIMISATION","department":"MoD","category":"Military Capability","description":"Defence Estate Optimisation Portfolio is a long-term investment of £5.1Bn to modernise the defence estate. It is an ambitious portfolio of construction activity, unit and personnel moves, and site disposals that will deliver a better structured, modern, and more sustainable estate to support military capability.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Project's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER, compared with the Infrastructure and Projects Authority's assessment last year of AMBER. This is due to the following factors. Compared to financial year 23/24-Q4, the NISTA Delivery Confidence Assessment rating at 24/25-Q4 remained at Amber. This is primarily due to the following factors: The programme's complexity and long timeline. Close monitoring of this suite of activities continues and is subject to a governance structure based around central Finance Military Capability management that is working well and supports strong working relationships while providing a defence wide perspective and is a key driver for the current and future success. The Portfolio is now in the delivery phase, successfully implementing the Contract Permissioning Group, designed to improve the efficiency and pace of approvals, enabling a reduction in standard approvals timing to 5-weeks. This framework will reduce the procurement timelines for projects by up to 18 months.","startDate":"2016-09-30","endDate":"2041-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2041.","fyBaseline":213.53,"fyForecast":193.56,"fyVariance":9.35,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The Defence Estate Optimisation in year variance, an overall underspend against its issued budget. This is due to the following main drivers: 1. The introduction of additional spending controls and lack of resource within commercial function has resulted in delays to placing projects on contract. 2. Additionally there have been legal, commercial and security challenges leading to delays. 3. The new design and build contracting process has taken projects and suppliers longer than envisaged to navigate through the complex process. 4. Affordability challenges presented by some projects have necessitated a resubmission and reduction in scope to meet Affordability targets. This has resulted in project schedules being updated, changing funding profiles into future years.","wholeLifeCost":6376.29,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 5208 to 6376. This is primarily due to the following factors. The Defence Estate Optimisation budgets have been realigned to V13 from V12 baseline. This has been endorsed by the Portfolio Board, resulting in increased Whole Life Total costs. This is partly due to additional spend controls, with initial projects and suppliers taking additional time adapting to the complexities of the new design and build contract process leading to further delays. Project costs for some sites have matured and been updated by the project teams as they were initially based on early estimates, leading to new cost models and increased scope due to refined stakeholder needs. Recent economic challenges like rising material, inflation, and labour costs have placed a further strain on the portfolio. Committing to evolving standards like Net Zero and carbon savings has compounded the case further.","benefits":21281.95,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 17656 to 21281. This is primarily due to the following factors.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Scope & requirements"],"evidenceExcerpt":"The Project's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER, compared with the Infrastructure and Projects Authority's assessment last year of AMBER. This is due to the following factors. Compared to financial year 23/24-Q4, the NISTA Delivery Confidence Assessment rating at 24/25-Q4 remained at Amber. This is primarily due to the following…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":0,"attentionScore":33,"attentionReasons":["Current published delivery confidence is Amber","In-year forecast variance is +47.6%"]},{"id":"HO_0016_1213-Q1","year":2026,"name":"EMERGENCY SERVICES MOBILE COMMUNICATIONS","department":"HO","category":"Information and Communications Technology (ICT)","description":"The Programme aims to replace Airwave, the current mobile communications service used by the 3 Emergency Services and other public safety users. The new service is called the 'Emergency Services Network' (ESN) and will operate over a 4G LTE commercial mobile network, enhanced to meet the public safety requirements for coverage, functionality, availability and security.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at AMBER after the NISTA Gate 0 review in November 2025.","startDate":"2011-06-01","endDate":null,"scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same.","fyBaseline":1022.78,"fyForecast":512.06,"fyVariance":49.93,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors: 1. Core Costs –The financial year baseline contains all costs (core, non-core, and legacy) related to the programme. Core programme costs are apportioned by agreed Memorandum of Understanding (MoU) percentages for the relevant Funding Sponsor Bodies (FSBs) to make their contribution. The Financial Year Forecast contains only the net core costs borne by the Home Office. 2. Non-Core Costs – Non-Core Costs are borne directly by individual User Organisations and so, whilst they are modelled in the Financial Year Baseline, they are not all captured in the Financial Year Forecast. 3. Awarding of Major Contracts – The baseline is taken from the most recent approved business case, endorsed by HMT/CST on 14 November 2024, since which 2 significant contracts have been placed. Though these contracts have not greatly changed the whole life cost, they have resulted in costs being re-profiled.","wholeLifeCost":18139.58,"costNarrative":"Compared to financial year 24/25-Q4, the projects departmentally agreed Whole Life Cost at 25/26 remained at £19,181m. This is due to them being based on the same 2024 business case. An updated business case which would amend these whole life cost figures is still awaiting final Treasury approval but will be reflected in future submissions.","benefits":3723.69,"benefitsNarrative":"The Programme's departmentally agreed benefits at 2025/26-Q4 remained at £2,350 million (PV) over 19 years. This remains identical to financial year 2024/25-Q4. This is due to the 2025/26 PBC not yet having Chief Secretary to HM Treasury clearance. Please note the 2025/26 PBC has been cleared by Home Office Investment Committee following Funding Sponsor Bodies clearance. It has also obtained clearance from HM Treasury / NISTA.","themes":["Cost & funding","Approvals & decisions","Governance & assurance","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at AMBER after the NISTA Gate 0 review in November 2025. Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same.","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"HO_0016_1213-Q1","year":2020,"name":"Emergency Services Mobile Communications Programme (ESMCP)","department":"HO","category":"Infrastructure and Construction","description":"Aims to replace the mobile communications service used by the three Emergency Services and other public safety users with an Emergency Services Network (ESN).","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber/Red, which has not changed since last year�s Q2 1819 Amber/Red, due primarily to the following factors; - The Emergency Services Mobile Communication Programme (ESMCP) has been reset and an incremental delivery of Emergency Services Network (ESN) was introduced. This was in response to continuing challenges with delivery and lack of user confidence. To proceed with the accepted ESN�s phased delivery approach, it was necessary to update commercial arrangements with suppliers. - The programme has made considerable progress delivering ESN technology specifically in: - ESN Direct 1, the first push to talk product - ESN Connect, the data product - ESN Assure 1.1, the coverage measurement product Since the Q2 1920 (30th September 2019) Amber/Red IPA DCA, the following primary project actions have impacted the original Q2 IPA DCA; - The Programme is working through its revised schedule and has successful launched new planned products. Lessons have been learnt and they have been taken into account with regards to the integrated programme plan. The other core programme products will be delivered over the course of 2020 and 2021. - Significant progress has been made with a number of related projects meaning that the cost of the technical solution is considerably clearer, and with the plan being refined. Work continues with users to assess the length of time they need to transition to ESN. The programme has worked closely with the Independent Assurance Panel to identify barriers to roll out of the solution and with users to incorporate the insights of the panel's challenges in user plans. - Once the Integrated Programme Plan is re-baselined, the financial model will be updated to take account of the current and forward position of the programme which will then refreshed Programme Business Case (PBC) due Q2 2020. With regards to COVID-19 the programme is working to preserve the critical path as far as possible.","startDate":"2011-06-01","endDate":"2022-12-31","scheduleNarrative":"The scheduled baseline project end date at Q2 1920 (30th September 2019) is 31/12/22, has lengthened by 730 days since last year's Q2 1819 date of 31/12/20, due primarily to the following factors; - The programme under went an extensive review and an incremental delivery of ESN was introduced. The review also included work to assess the length of time users needed to transition from the current Airwave service to ESN. Since the Q2 1920 (30th September 2019) baseline project end date of 31/12/22, the following non-project operating environment activities have impacted the original Q2 baseline project end date; - With regards to COVID-19, roll out of ESN in the underground and remote site mast builds are being impacted. However, the programme is working to preserve the critical path as far as possible. Since the Q2 1920 (30th September 2019) baseline project end date of 31/12/22, the following primary project actions have impacted the original Q2 baseline project end date; - An updated Programme Business Case is planned for Q2 2020 to reflect the revised programme delivery plans and provide greater certainty around the National Shutdown date for Airwave of 31 December 2022. - The programme has worked to align the plan to the budget available from the 20-21 top slice, with a view to phasing spend but hold to the programme's critical path.","fyBaseline":817.0,"fyForecast":817.0,"fyVariance":0.0,"varianceNarrative":"Budget variance less than 5%","wholeLifeCost":9521.92,"costNarrative":"The baseline Whole Life Cost at Q2 1920 (30th September 2019) is �9,521.92 m, has increased by �4463.29 m since last year's Q2 1819 (�m) baseline Whole Life Cost of �5,058.63 m, due primarily to the following factors; - The stated Whole Life Cost increase includes the impact of an extension to the evaluation period from 2031/32 to 2036/37 which adds an additional five years of cost to the Whole Life Costs. - Costs now include an extended period before the legacy Airwave network is assumed to be shutdown. Legacy costs, a subset of the Whole Life Costs quoted, are included until 31/12/2023. - Further cost increases were due to higher cost of ESN devices, coverage on London Underground, resource costs to cover extended project timelines, core contract updates and additional contingencies costs. Since the Q2 1920 (30th September 2019) �9,521.92 m baseline Whole Life Cost, the following non-project operating environment activities have impacted the original baseline Q2 Whole Life Cost; - Whilst the impact of COVID-19 is yet to be determined, it is expected to adversely impact on a number of areas of the Whole Life Cost, through possible schedule delays to operational evaluation and deployment plans. Since the Q2 1920 (30th September 2019) �9,521.92 m baseline Whole Life Cost, the following primary project actions have impacted the original Q2 baseline Whole Life Cost; - Work is ongoing to update the assessment of costs for operationally acceptable resilience and coverage in critical operational locations - Deployment planning is being refined to provide an updated assessment of the costs associated with mobilisation and transition activities.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Technical & integration"],"evidenceExcerpt":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber/Red, which has not changed since last year�s Q2 1819 Amber/Red, due primarily to the following factors; - The Emergency Services Mobile Communication Programme (ESMCP) has been reset and an incremental delivery of Emergency Services Network (ESN) was introduced.…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2020","sourceLabel":"IPA Annual Report 2019-20"},{"id":"HO_0016_1213-Q1","year":2021,"name":"Emergency Services Mobile Communications Programme (ESMCP)","department":"HO","category":"Infrastructure and Construction","description":"Emergency Services Mobile Communications Programme (ESMCP) is a cross government programme to deliver the new Emergency Services Network (ESN) critical communications system; replacing the current technology Airwave. ESN will transform emergency services' communications, by moving away from the largely 'voice only' proprietary and legacy Airwave radio system to a new combined voice and data service that leverages off-the-shelf technology and reuses commercial mobile telephone networks. Enhancements exist to prioritise emergency service calls above regular commercial traffic on the mobile network.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber/red. This is primarily due to the following factors: The Amber/Red rating reflects that the Full Business Case (FBC) is being collaboratively re-worked with Senior Users in readiness for approval in summer 2021. In conjunction with the revision of the FBC, a priority focus is engagement with suppliers to ensure the delivery plan meets user requirements. The new full-time Senior Responsible Owner (SRO) is working with the programme to gain support with Senior Stakeholders and amongst the user communities. User engagement continues with a full engagement plan developed to increase user confidence.","startDate":"2011-06-01","endDate":"2024-11-19","scheduleNarrative":"Compared to financial year 19/20-Q2, the project's end-date increased from 31 December 2022 to 19 November 2024 . This is primarily due to the following factors: A programme re-plan is underway and the programme is updating its FBC in conjunction with the service users for consideration and approval in summer 2021. A key aspect of this will be ensuring that the rollout schedule is technically deliverable, acceptable to service users and delivers value for money at an acceptable level of risk.","fyBaseline":876.93,"fyForecast":876.93,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":11198.84,"costNarrative":"Compared to financial year 19/20-Q2, the projects Baseline Whole Life Cost increased from �9521.92m to �11198.84m. This is primarily due to the following factors: Programme re-plan underway in accordance with the revision of the FBC which has seen costs increase. Reporting of the Whole Life Costs will take place once the revised FBC has been approved.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber/red. This is primarily due to the following factors: The Amber/Red rating reflects that the Full Business Case (FBC) is being collaboratively re-worked with Senior Users in readiness for approval in summer 2021. In conjunction…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21"},{"id":"HO_0016_1213-Q1","year":2022,"name":"Emergency Services Mobile Communications Programme (ESMCP)","department":"HO","category":"Infrastructure and Construction","description":"Emergency Services Mobile Communications Programme (ESMCP) is a cross government programme to deliver the new Emergency Services Network (ESN) critical communications system; replacing the current technology Airwave. ESN will transform emergency services' communications, by moving away from the largely 'voice only' proprietary and legacy Airwave radio system to a new combined voice and data service that leverages off-the-shelf technology and reuses commercial mobile telephone networks. Enhancements exist to prioritise emergency service calls above regular commercial traffic on the mobile network.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 decreased from Amber/red to Amber. A Full Business Case (FBC) was approved by Her Majesty's Treasury in August 2021. The delivery plan is being collaboratively developed to meet user requirements. The full-time Senior Responsible Owner (SRO) is very actively working with the programme and has strong support from Senior Stakeholders and from amongst the wider user communities. A full engagement plan has been developed to increase user confidence.","startDate":"2011-06-01","endDate":"2026-12-31","scheduleNarrative":"Compared to 2021-Q4, your project end-date increased from 19 NOV 2024 to 31 DEC 2026 . This is primarily due to the following factors: An update of the Integrated Programme Plan (referred to as version 5 / 6) will be developed through April 2022 following conclusion of the re-lotting activity. This will then go through Governance for any decisions impacting schedule, scope or cost culminating in a Major Projects Review Group during Summer / Autumn 2022.","fyBaseline":1024.03,"fyForecast":1024.03,"fyVariance":0.0,"varianceNarrative":"The budget variance is inferior or equal to 5%.","wholeLifeCost":12026.0,"costNarrative":"Compared to2021-Q4, the projects Baseline Whole Life Cost increased from 11198.84 (£m) to 12026.34 (£m). This is primarily due to the following factors: These figures reconcile to the source data from the current Finance model, the main difference is in the Capital DEL recurring costs, which is an error carried over from a previous Financial Model version before it was refreshed and this has now been rectified in this report.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 decreased from Amber/red to Amber. A Full Business Case (FBC) was approved by Her Majesty's Treasury in August 2021. The delivery plan is being collaboratively developed to meet user requirements. The full-time Senior Responsible…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"HO_0016_1213-Q1","year":2023,"name":"Emergency Services Mobile Communications Programme (ESMCP)","department":"HO","category":"Infrastructure and Construction","description":"Emergency Services Mobile Communications Programme (ESMCP) is a cross government programme to deliver the new Emergency Services Network (ESN) critical communications system; replacing the current technology Airwave. ESN will transform emergency services' communications, by moving away from the largely 'voice only' proprietary and legacy Airwave radio system to a new combined voice and data service that leverages off-the-shelf technology and reuses commercial mobile telephone networks. Enhancements exist to prioritise emergency service calls above regular commercial traffic on the mobile network.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 decreased from Amber to Red. This is primarily due to the following factors. The Programme has closed most of the recommendations from its last Independent Project Assurance Review (PAR) in January 2023. A review of progress against the January 2023 PAR actions is being undertaken in April 2023, followed by a session with the Major Programme Review Group (MPRG) on 21 April 2023. The programme have updated their commercial strategy, and are working through the procurement, governance and compliance for the contracts. Actions are underway to address the other outstanding PAR recommendations relating to skills, resourcing and security.","startDate":"2011-06-01","endDate":"2026-12-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2026-12-31. This is primarily due to the following factors. ESMCP is updating its Full Business Case (FBC) to gain endorsement on the direction of travel and agree the delivery timetable and costs to complete the programme.Furthermore, with a new supplier expected to be procured in 2024, our forecasts for completing the transition from Airwave to ESN and then the shutdown date of Airwave is yet to be confirmed.","fyBaseline":890.34,"fyForecast":728.74,"fyVariance":-18.0,"varianceNarrative":"The budget variance exceeds 5%. The overall forecast underspend is mostly driven by a change in Programme delivery plans and the exit of a key supplier. Some activities identified that could be paused/delayed during the substantial shift in the commercial arrangements and re-procurement, along with coverage build re-plans. These underspends and deferred activities are moving costs and timelines to the right. The impact will be reflected in the next iteration of the Business case.","wholeLifeCost":11263.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 decreased from 12026m. to 11263m. This is primarily due to the following factors. The whole Life budget cost is based on the last approved full business case July 21. Whole Life cost include ESN programme, ongoing run and legacy Airwave costs. The full business case is currently been updated.","benefits":3746.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 3746m. The project's departmental-agree monetised benefits at 22/23-Q4 is 3746m.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 decreased from Amber to Red. This is primarily due to the following factors. The Programme has closed most of the recommendations from its last Independent Project Assurance Review (PAR) in January 2023. A review of progress against…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"HO_0016_1213-Q1","year":2024,"name":"Emergency Services Mobile Communications Programme (ESMCP)","department":"HO","category":"Infrastructure and Construction","description":"The Programme aims to replace the mobile communications service used by the 3 Emergency Services and other public safety users. This will be achieved through the introduction of a new service called the 'Emergency Services Network' (ESN), operating over a 4G LTE commercial mobile network enhanced to meet the public safety requirements for coverage, functionality, availability and security.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Red. This is primarily due to the following factors. The Programme has closed most of the recommendations from the last Cabinet Office led independent Project Assurance Reviews (PAR) carried out in January and followed-up in April 2023. A meeting with the Cabinet Office Major Projects Review Group (MPRG) took place in May 2023 where the Programme's Commercial Strategy was endorsed. The programme is working through the re-procurement of the User Services contract, and the extension to the Mobile Services contract. Actions are underway to prepare for the next PAR and the necessary governance and approvals following completion of the commercial work, later this year.","startDate":"2011-06-01","endDate":"2026-12-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2026-12-31. This is primarily due to the following factors. ESMCP is updating it's Programme Business Case (PBC) to gain further endorsement on the direction of travel and agree the delivery timetable and costs to complete the programme. Furthermore, with a new User Services supplier expected to be procured later this year, our forecasts for completing the transition from Airwave to ESN and then the shutdown date for Airwave is yet to be confirmed.","fyBaseline":718.32,"fyForecast":614.39,"fyVariance":-14.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The overall underspend is mostly driven by a change in Programme delivery plans since the 2021 FBC, including the exit of a key supplier and timing of re-procurements, along with coverage build re-plans. These Programme underspends and deferred activities are moving costs and timelines to the right. The variance also includes the impact of the Competition and Markets Authority (CMA) charge control on Airwave prices.","wholeLifeCost":11263.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 remained at 11263m. This is primarily due to the following factors. The Whole life budget cost is based on the last approved full business case July 21. Whole life costs include ESN programme, ongoing run and legacy Airwave costs. The full business case is currently been updated.","benefits":3682.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 2324-Q4 decreased from 3746m. to 3682m.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Red. This is primarily due to the following factors. The Programme has closed most of the recommendations from the last Cabinet Office led independent Project Assurance Reviews (PAR) carried out in January and followed-up…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"HO_0016_1213-Q1","year":2025,"name":"EMERGENCY SERVICES MOBILE COMMUNICATIONS","department":"HO","category":"ICT","description":"The Emergency Services Network (ESN) will enable fast, safe and secure voice, video and data across a 4G/5G network, giving first responders immediate access to life-saving data, images and information in live situations and emergencies on the frontline. ESN replaces the current Terrestrial Trunked Radio (TETRA) system, the Airwave Service, which Great Britain’s three emergency services (3ES) and related first responder agencies depend on for mission-critical voice communications. ESN is being delivered by the Emergency Services Mobile Communications Programme (ESMCP). The global consensus towards using 4G/5G technologies for such Public Safety Communications Services, twinned with the nationwide roll-out of such technologies by commercial operators since Airwave was commissioned, opened an opportunity which ESN is exploiting; namely, to use and supplement commercial 4G/5G. Continued TETRA/Airwave use, as with use of any aging technology, is becoming riskier. As ESMCP’s Independent Assurance Panel (IAP) stated at the Public Accounts Committee (PAC) hearing on 26 April 2023, “… the technology ESN will utilise is the correct direction of travel, because Airwave and the TETRA service will become increasingly obsolete and ever-more expensive to maintain.”","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from RED to AMBER. This is primarily due to the following factors‚ ESMCP has undertaken Project Assurance Reviews (PAR), throughout its lifecycle, the last was conducted in June 2024, as part of the 2024 Programme Business Case (PBC) governance and approvals process. The June 2024 PAR report initially gave the programme a RED rating, due solely to the risk of legal challenge from Motorola, commenting that in all other areas the programme had made excellent progress. The report made a number of recommendations to manage the risk, ahead of publication of the Voluntary Ex-Ante Transparency Notice (VEAT) for the Mobile Services direct award. Programme senior leaders took the recommended actions and the VEAT was issued on 31 July 2024, without challenge. At the follow-up Cabinet Office Assurance of Action Plan (AAP) review, on 9 September 2024, the review team recognised the exceptional progress the programme had made to mitigate the risk of legal challenge, recommending an improved AMBER rating, which allowed the Major Projects Review Group (MPRG) meeting to take place on 26 September 2024. MPRG accepted the recommended AMBER rating, approved the PBC, both Mobile Services [MS] and User Services [US] contract awards which led to the Chief Secretary of the Treasury’s approval of the PBC and MS/US contract awards, which was endorsed on 14 November 2024.","startDate":"2011-06-01","endDate":null,"scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/12/2026 to 01/05/2030. This is primarily due to the following factors‚ During 2021, delays in the delivery of the Motorola services under the User Services contract meant that full transition was no longer possible before the end of December 2022. Consequently, during 2021 the Emergency Services Mobile Communications Programme (ESMCP) extended the Airwave contracts from the scheduled National Shut Down Target Sate (NSDTD) of 31 December 2022 to a target date of 31 December 2026. At the time it was believed that this extension would ensure continuity of service and enable sufficient time to transition from Airwave to the Emergency Services Network (ESN). With continued delays in the delivery of the Lot 2 contract during the early part of 2022, Motorola decided it did not want to extend the provision of Lot 2 beyond 2024. In April 2022, Motorola approached ESMCP to explore the opportunity of a mutually agreed full termination of Lot 2, which was agreed on 19 December 2022. These delivery delays and Motorola’s early exit led to the requirement to re-procure the User Service contract. In late 2024 a new User Services contract was successfully awarded IBM, leading to a new delivery plan and revised target dates for Airwave Shutdown (ASD) and transition complete at the end of 2029, affecting programme closure, now 01 May 2030.","fyBaseline":349.74,"fyForecast":349.74,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%. The programme underspent compared to its 2024/25 cost baseline due to the revised start dates of the User Services and Mobile Services contracts in late 2024.","wholeLifeCost":19180.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 11263 to 19180. This is primarily due to the following factors‚ • Evaluation period of the project was extended from FY36/37 to FY43/44. • Core Costs increasing due to higher inflation, increased coverage build, replacement of User Services Provider and additional capital refresh costs. • Airwave Shut Down is now targeted by 31 Dec 2029","benefits":1343.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) decreased from 3682 to 1343. This is primarily due to the following factors‚ The Benefits submission of £5.644bn is comprised of £2.711bn for Government Cash-releasing and £2.932bn for Wider UK Public Economic. Government Cash Releasing is the difference between the programme continuing with Airwave under Option 1 and pursuing the preferred Option under Option 2. Wider UK Public Economic is the total ESN benefits, mostly comprised of the Economic benefit to Ambulance ESN 999 calls and additional mobile coverage for the public.","themes":["Commercial & supply chain","Cost & funding","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from RED to AMBER. This is primarily due to the following factors‚ ESMCP has undertaken Project Assurance Reviews (PAR), throughout its lifecycle, the last was conducted in June 2024, as part of the 2024 Programme Business…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"HO_0016_1213-Q1","year":2026,"name":"EMERGENCY SERVICES MOBILE COMMUNICATIONS","department":"HO","category":"Information and Communications Technology (ICT)","description":"The Programme aims to replace Airwave, the current mobile communications service used by the 3 Emergency Services and other public safety users. The new service is called the 'Emergency Services Network' (ESN) and will operate over a 4G LTE commercial mobile network, enhanced to meet the public safety requirements for coverage, functionality, availability and security.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at AMBER after the NISTA Gate 0 review in November 2025.","startDate":"2011-06-01","endDate":null,"scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same.","fyBaseline":1022.78,"fyForecast":512.06,"fyVariance":49.93,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors: 1. Core Costs –The financial year baseline contains all costs (core, non-core, and legacy) related to the programme. Core programme costs are apportioned by agreed Memorandum of Understanding (MoU) percentages for the relevant Funding Sponsor Bodies (FSBs) to make their contribution. The Financial Year Forecast contains only the net core costs borne by the Home Office. 2. Non-Core Costs – Non-Core Costs are borne directly by individual User Organisations and so, whilst they are modelled in the Financial Year Baseline, they are not all captured in the Financial Year Forecast. 3. Awarding of Major Contracts – The baseline is taken from the most recent approved business case, endorsed by HMT/CST on 14 November 2024, since which 2 significant contracts have been placed. Though these contracts have not greatly changed the whole life cost, they have resulted in costs being re-profiled.","wholeLifeCost":18139.58,"costNarrative":"Compared to financial year 24/25-Q4, the projects departmentally agreed Whole Life Cost at 25/26 remained at £19,181m. This is due to them being based on the same 2024 business case. An updated business case which would amend these whole life cost figures is still awaiting final Treasury approval but will be reflected in future submissions.","benefits":3723.69,"benefitsNarrative":"The Programme's departmentally agreed benefits at 2025/26-Q4 remained at £2,350 million (PV) over 19 years. This remains identical to financial year 2024/25-Q4. This is due to the 2025/26 PBC not yet having Chief Secretary to HM Treasury clearance. Please note the 2025/26 PBC has been cleared by Home Office Investment Committee following Funding Sponsor Bodies clearance. It has also obtained clearance from HM Treasury / NISTA.","themes":["Cost & funding","Approvals & decisions","Governance & assurance","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at AMBER after the NISTA Gate 0 review in November 2025. Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same.","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"HO_0016_1213-Q1","year":2025,"name":"EMERGENCY SERVICES MOBILE COMMUNICATIONS","department":"HO","category":"ICT","description":"The Emergency Services Network (ESN) will enable fast, safe and secure voice, video and data across a 4G/5G network, giving first responders immediate access to life-saving data, images and information in live situations and emergencies on the frontline. ESN replaces the current Terrestrial Trunked Radio (TETRA) system, the Airwave Service, which Great Britain’s three emergency services (3ES) and related first responder agencies depend on for mission-critical voice communications. ESN is being delivered by the Emergency Services Mobile Communications Programme (ESMCP). The global consensus towards using 4G/5G technologies for such Public Safety Communications Services, twinned with the nationwide roll-out of such technologies by commercial operators since Airwave was commissioned, opened an opportunity which ESN is exploiting; namely, to use and supplement commercial 4G/5G. Continued TETRA/Airwave use, as with use of any aging technology, is becoming riskier. As ESMCP’s Independent Assurance Panel (IAP) stated at the Public Accounts Committee (PAC) hearing on 26 April 2023, “… the technology ESN will utilise is the correct direction of travel, because Airwave and the TETRA service will become increasingly obsolete and ever-more expensive to maintain.”","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from RED to AMBER. This is primarily due to the following factors‚ ESMCP has undertaken Project Assurance Reviews (PAR), throughout its lifecycle, the last was conducted in June 2024, as part of the 2024 Programme Business Case (PBC) governance and approvals process. The June 2024 PAR report initially gave the programme a RED rating, due solely to the risk of legal challenge from Motorola, commenting that in all other areas the programme had made excellent progress. The report made a number of recommendations to manage the risk, ahead of publication of the Voluntary Ex-Ante Transparency Notice (VEAT) for the Mobile Services direct award. Programme senior leaders took the recommended actions and the VEAT was issued on 31 July 2024, without challenge. At the follow-up Cabinet Office Assurance of Action Plan (AAP) review, on 9 September 2024, the review team recognised the exceptional progress the programme had made to mitigate the risk of legal challenge, recommending an improved AMBER rating, which allowed the Major Projects Review Group (MPRG) meeting to take place on 26 September 2024. MPRG accepted the recommended AMBER rating, approved the PBC, both Mobile Services [MS] and User Services [US] contract awards which led to the Chief Secretary of the Treasury’s approval of the PBC and MS/US contract awards, which was endorsed on 14 November 2024.","startDate":"2011-06-01","endDate":null,"scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/12/2026 to 01/05/2030. This is primarily due to the following factors‚ During 2021, delays in the delivery of the Motorola services under the User Services contract meant that full transition was no longer possible before the end of December 2022. Consequently, during 2021 the Emergency Services Mobile Communications Programme (ESMCP) extended the Airwave contracts from the scheduled National Shut Down Target Sate (NSDTD) of 31 December 2022 to a target date of 31 December 2026. At the time it was believed that this extension would ensure continuity of service and enable sufficient time to transition from Airwave to the Emergency Services Network (ESN). With continued delays in the delivery of the Lot 2 contract during the early part of 2022, Motorola decided it did not want to extend the provision of Lot 2 beyond 2024. In April 2022, Motorola approached ESMCP to explore the opportunity of a mutually agreed full termination of Lot 2, which was agreed on 19 December 2022. These delivery delays and Motorola’s early exit led to the requirement to re-procure the User Service contract. In late 2024 a new User Services contract was successfully awarded IBM, leading to a new delivery plan and revised target dates for Airwave Shutdown (ASD) and transition complete at the end of 2029, affecting programme closure, now 01 May 2030.","fyBaseline":349.74,"fyForecast":349.74,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%. The programme underspent compared to its 2024/25 cost baseline due to the revised start dates of the User Services and Mobile Services contracts in late 2024.","wholeLifeCost":19180.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 11263 to 19180. This is primarily due to the following factors‚ • Evaluation period of the project was extended from FY36/37 to FY43/44. • Core Costs increasing due to higher inflation, increased coverage build, replacement of User Services Provider and additional capital refresh costs. • Airwave Shut Down is now targeted by 31 Dec 2029","benefits":1343.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) decreased from 3682 to 1343. This is primarily due to the following factors‚ The Benefits submission of £5.644bn is comprised of £2.711bn for Government Cash-releasing and £2.932bn for Wider UK Public Economic. Government Cash Releasing is the difference between the programme continuing with Airwave under Option 1 and pursuing the preferred Option under Option 2. Wider UK Public Economic is the total ESN benefits, mostly comprised of the Economic benefit to Ambulance ESN 999 calls and additional mobile coverage for the public.","themes":["Commercial & supply chain","Cost & funding","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from RED to AMBER. This is primarily due to the following factors‚ ESMCP has undertaken Project Assurance Reviews (PAR), throughout its lifecycle, the last was conducted in June 2024, as part of the 2024 Programme Business…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":null,"attentionScore":33,"attentionReasons":["Current published delivery confidence is Amber","In-year forecast variance is +49.9%"]},{"id":"MOD_0144_2122-Q1","year":2026,"name":"GROUND BASED AIR DEFENCE (GBAD)","department":"MOD","category":"Military Capability","description":"The Land Ground Based Air Defence (GBAD) programme delivers a modern, integrated air defence capability to protect UK forces and critical assets against evolving air and missile threats. Structured through Capability Uplift Plans (CUPs), the programme balances immediate capability delivery with longer-term transformation. CUP 1 focuses on fielding “no regrets” capabilities already on contract, including enhancements to existing systems. CUP 2 seeks to deliver a more integrated and digitally-enabled force, improving lethality, survivability and interoperability with NATO partners. Future phases will explore further capability evolution, including emerging technologies and alternative force constructs. The programme brings together a range of industry partners, delivery organisations and stakeholders to deliver a coherent, layered defence system, underpinned by modern command and control and a data-centric approach to operations.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors. 1. Over the past 12 months, delivery confidence has remained Amber primarily due to challenges associated with the transition from early capability delivery into more complex programme integration. Increased cost pressures, particularly within elements of the short-range air defence capability, have raised affordability concerns against available funding. 2. In parallel, resource constraints across both the programme team and delivery organisations have impacted the pace of progress and contributed to schedule pressure. 3. Dependencies on wider Defence activity, including infrastructure and investment decisions, have also introduced uncertainty and limited the programme’s ability to progress at the required rate. 4. Collectively, these factors reflect the growing complexity of delivering an integrated, modernised air defence system, requiring continued alignment of funding, resource and dependencies to support future delivery confidence.","startDate":"2018-07-02","endDate":"2033-12-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 31/12/2033.","fyBaseline":239.41,"fyForecast":134.66,"fyVariance":43.75,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. 1. Defence financial challenges and internal spend commitment controls have led to a different spend profile to that initially envisaged. 2. Further complicated by unaffordable cost estimtes for BC 2 SHORAD capability that require furher review and mitigations.","wholeLifeCost":1454.95,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) decreased from £2967.59M to £1589.63M. This is due to the programme having undertaken a rebaselining exercise against a revised affordable envelope.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Delivery & schedule","Workforce & capability","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors. 1. Over the past 12 months, delivery confidence has remained Amber primarily due to challenges associated with the transition from early capability delivery into more complex programme…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"MOD_0144_2122-Q1","year":2022,"name":"Ground Based Air Defence (GBAD)","department":"MOD","category":"Military Capability","description":"The Land Ground Based Air Defence programme will modernise the Army's air defence capabilities in the face of rapidly developing threats, and is a very high priority for the Army. This includes the development of an integrated layered air defence system comprising Small Air Targets and Short and Medium Range Air Defence, and technology that allows engagement of targets at optimum range and early air raid warning.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber. This is primarily due to the following factors: The Defence in a Competitive Age Command Paper (CP411) published in March 2021 confirmed the reprioritisation of vehicle fleets. This has resulted in the need to identify a new vehicular platform on which to mount the Short-Range Air Defence missile system.","startDate":"2018-07-02","endDate":"2033-12-30","scheduleNarrative":"The project end-date is 30 December 2033. This is primarily due to the following factors: The Programme entered the Government Major Projects Portfolio in Financial Year 2021/22, as such there is no baseline date recorded for March 21 for comparison.","fyBaseline":4.96,"fyForecast":4.87,"fyVariance":0.0,"varianceNarrative":"The budget variance is inferior or equal to 5%.","wholeLifeCost":1787.0,"costNarrative":"The projects Baseline Whole Life Cost is 1787.35 (£m). This is primarily due to the following factors: Army HQ has reviewed its funding profile; although this saw a small reduction in designated funding the Army element of the Programme is now affordable. A similar exercise is still required for the MOD Weapons Evaluation and Capability Assurance elements of the programme pending updated costs.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Workforce & capability"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber. This is primarily due to the following factors: The Defence in a Competitive Age Command Paper (CP411) published in March 2021 confirmed the reprioritisation of vehicle fleets. This has resulted in the need to identify a new vehicular platform on which to mount the…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"MOD_0144_2122-Q1","year":2023,"name":"Ground Based Air Defence (GBAD)","department":"MOD","category":"Military Capability","description":"The Land Ground Based Air Defence programme will modernise the Army's air defence capabilities in the face of rapidly developing threats and is a very high priority for the Army. This includes the development of an integrated layered air defence system comprising Small Air Targets and Short and Medium Range Air Defence, and technology that allows engagement of targets at optimum range and early air raid warning.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. Resourcing issues which put the schedule at risk have improved, and the production of a revised programme roadmap has led to milestone adjustments. An incremental approach to capability delivery should present opportunities to realise some early benefits.","startDate":"2018-07-02","endDate":"2033-12-30","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2033-12-30. This is primarily due to the following factors. NA","fyBaseline":9.37,"fyForecast":8.07,"fyVariance":-14.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factor: Work relating to Land Ceptor is behind schedule and did not commence as planned in FY22/23","wholeLifeCost":2303.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 increased from 1787m. to 2303m. This is primarily due to the following factors. The programme is still in its Concept Phase and ahead of Outline Business Case and Full Business Case approvals. The scope of the programme, associated costings and budget provision is not yet fully defined and continues to mature. The Whole Life Cost is based at this stage on the budget for the next 10 years only (plus previous year expenditure) and, as such, the reported Whole Life Cost this year includes a budget for FY2032/33.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This programme does not report cashable benefits. Its aim is to provision the armed forces with the equipment and / or infrastructure required.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. Resourcing issues which put the schedule at risk have improved, and the production of a revised programme roadmap has led to milestone adjustments. An incremental…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"MOD_0144_2122-Q1","year":2024,"name":"Ground Based Air Defence (GBAD)","department":"MOD","category":"Military Capability","description":"The Land Ground Based Air Defence programme is striving to modernise Defence’s ground based air defence capabilities in the face of rapidly developing threats, and is very high priority for the Army. This includes the development of an integrated layered air defence system comprising countering Small Air Targets, Short and Medium Range Air Defence.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The programme has sustained progress in addressing recommendations of its IPA strategic review, including the resourcing of more programme staff, and the adoption of a more holistic approach to programme delivery, and a more realistic programme roadmap.","startDate":"2018-07-02","endDate":"2033-12-31","scheduleNarrative":"The project's end-date at 23/24-Q4 is scheduled to finish on 2033-12-30.","fyBaseline":61.77,"fyForecast":69.37,"fyVariance":12.304,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The perceived underspend for the GBAD programme is the result of significant delay in securing approval of Business Case 1 as submitted in November 2023.","wholeLifeCost":2237.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 decreased from 2303m. to 2237m. This is primarily due to the following factors. Financial reconciliation and refinement of the first two capability uplift packages (CUPs) during financial year 23/24 has resulted in a decrease to the programme’s WLC at Q4. Future CUPs were discussed as part of the Autumn 2023 Balance of Investment process where Army Headquarters agreed in principle to increase the funding for the overall programme, specifically to increase volumes of medium range and short range air defence systems, counter small Unmanned Aircraft Systems. The Army continues to review the programme’s funding profile in conjunction with the MOD Complex Weapons elements of the programme pending the MOD munition strategy and updated costs.","benefits":0.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 0m.","themes":["Cost & funding","Delivery & schedule","Workforce & capability","Approvals & decisions"],"evidenceExcerpt":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The programme has sustained progress in addressing recommendations of its IPA strategic review, including the resourcing of more programme staff, and the adoption of a more holistic approach to programme…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"MOD_0144_2122-Q1","year":2025,"name":"GROUND BASED AIR DEFENCE (GBAD)","department":"MoD","category":"Military Capability","description":"The Land Ground Based Air Defence programme is striving to modernise Defence’s ground based air defence capabilities in the face of rapidly developing threats, and is very high priority for the Army. This includes the development of an integrated layered air defence system comprising of countering Small Air Targets, Short and Medium Range Air Defence. Reprioritisation of vehicle fleets has resulted in the need to identify a new vehicle on which to mount the Short-Range Air Defence missile system. A solution will not be achieved before the current out-of-service date of the in-service platform (Stormer) in December 2026. A such, it is very likely, that Stormer will be extended in-service for a short period until the preferRed option becomes available to mitigate a capability gap. Alternative pathways to deliver a base vehicle for the Short-Range Air Defence capability are being actively considered.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. Principal areas which have led to this delivery confidence were the resourcing of more programme staff, the adoption of a more holistic approach to programme delivery and a more realistic programme roadmap.","startDate":"2018-07-02","endDate":"2033-12-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/12/2033.","fyBaseline":203.08,"fyForecast":58.74,"fyVariance":71.07,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. Defence financial challenges and internal spend commitment controls have led to a different spend profile to that initially envisaged.","wholeLifeCost":2967.59,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 2237 to 2967. This is primarily due to the following factors. Increases to Short-Range Air Defence (SHORAD) and the relatively immaturity of some of the cost estimates that will be refined and revised up to and post OBC for each of the project lines.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Delivery & schedule","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. Principal areas which have led to this delivery confidence were the resourcing of more programme staff, the adoption of a more holistic approach to programme delivery and a more realistic programme…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"MOD_0144_2122-Q1","year":2026,"name":"GROUND BASED AIR DEFENCE (GBAD)","department":"MOD","category":"Military Capability","description":"The Land Ground Based Air Defence (GBAD) programme delivers a modern, integrated air defence capability to protect UK forces and critical assets against evolving air and missile threats. Structured through Capability Uplift Plans (CUPs), the programme balances immediate capability delivery with longer-term transformation. CUP 1 focuses on fielding “no regrets” capabilities already on contract, including enhancements to existing systems. CUP 2 seeks to deliver a more integrated and digitally-enabled force, improving lethality, survivability and interoperability with NATO partners. Future phases will explore further capability evolution, including emerging technologies and alternative force constructs. The programme brings together a range of industry partners, delivery organisations and stakeholders to deliver a coherent, layered defence system, underpinned by modern command and control and a data-centric approach to operations.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors. 1. Over the past 12 months, delivery confidence has remained Amber primarily due to challenges associated with the transition from early capability delivery into more complex programme integration. Increased cost pressures, particularly within elements of the short-range air defence capability, have raised affordability concerns against available funding. 2. In parallel, resource constraints across both the programme team and delivery organisations have impacted the pace of progress and contributed to schedule pressure. 3. Dependencies on wider Defence activity, including infrastructure and investment decisions, have also introduced uncertainty and limited the programme’s ability to progress at the required rate. 4. Collectively, these factors reflect the growing complexity of delivering an integrated, modernised air defence system, requiring continued alignment of funding, resource and dependencies to support future delivery confidence.","startDate":"2018-07-02","endDate":"2033-12-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 31/12/2033.","fyBaseline":239.41,"fyForecast":134.66,"fyVariance":43.75,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. 1. Defence financial challenges and internal spend commitment controls have led to a different spend profile to that initially envisaged. 2. Further complicated by unaffordable cost estimtes for BC 2 SHORAD capability that require furher review and mitigations.","wholeLifeCost":1454.95,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) decreased from £2967.59M to £1589.63M. This is due to the programme having undertaken a rebaselining exercise against a revised affordable envelope.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Delivery & schedule","Workforce & capability","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors. 1. Over the past 12 months, delivery confidence has remained Amber primarily due to challenges associated with the transition from early capability delivery into more complex programme…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"MOD_0144_2122-Q1","year":2025,"name":"GROUND BASED AIR DEFENCE (GBAD)","department":"MoD","category":"Military Capability","description":"The Land Ground Based Air Defence programme is striving to modernise Defence’s ground based air defence capabilities in the face of rapidly developing threats, and is very high priority for the Army. This includes the development of an integrated layered air defence system comprising of countering Small Air Targets, Short and Medium Range Air Defence. Reprioritisation of vehicle fleets has resulted in the need to identify a new vehicle on which to mount the Short-Range Air Defence missile system. A solution will not be achieved before the current out-of-service date of the in-service platform (Stormer) in December 2026. A such, it is very likely, that Stormer will be extended in-service for a short period until the preferRed option becomes available to mitigate a capability gap. Alternative pathways to deliver a base vehicle for the Short-Range Air Defence capability are being actively considered.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. Principal areas which have led to this delivery confidence were the resourcing of more programme staff, the adoption of a more holistic approach to programme delivery and a more realistic programme roadmap.","startDate":"2018-07-02","endDate":"2033-12-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/12/2033.","fyBaseline":203.08,"fyForecast":58.74,"fyVariance":71.07,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. Defence financial challenges and internal spend commitment controls have led to a different spend profile to that initially envisaged.","wholeLifeCost":2967.59,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 2237 to 2967. This is primarily due to the following factors. Increases to Short-Range Air Defence (SHORAD) and the relatively immaturity of some of the cost estimates that will be refined and revised up to and post OBC for each of the project lines.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Delivery & schedule","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. Principal areas which have led to this delivery confidence were the resourcing of more programme staff, the adoption of a more holistic approach to programme delivery and a more realistic programme…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":0,"attentionScore":33,"attentionReasons":["Current published delivery confidence is Amber","In-year forecast variance is +43.8%"]},{"id":"DESNZ_0334_2324-Q3","year":2026,"name":"Hydrogen Allocation Round 1 (HAR1)","department":"DESNZ","category":"Infrastructure and Construction","description":"The first hydrogen allocation round (HAR1) offered both Hydrogen Production Business Model (HPBM) and Net Zero Hydrogen Fund (NZHF) support to first-of-a-kind electrolytic hydrogen projects. HAR1 aims to unlock private investment, accelerate early hydrogen deployment and support the growth of hydrogen supply chains, whilst contributing to long term decarbonisation and energy system resilience. HAR1 offered support to 11 projects, with the first project becoming operational in April 2026. The HPBM is designed to provide revenue support to low carbon hydrogen producers once their project is operational, helping them to overcome the operating cost gap between low carbon hydrogen and high carbon fossil fuels. Funding for the HPBM, confirmed at Budget 2024, will be exchequer funded until the introduction of the proposed Gas Shipper Obligation. The NZHF provides up to 20% capital expenditure (CAPEX) support for HAR 1 projects.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors: 11 Projects have signed contracts. Although 1 project withdrew (Whitelee), the remaining 10 projects continue to progress to either reach FID and subsequently COD or are imminently about to reach COD (HyMarnham April 2026). Remaining projects are expected to reach COD between August 2027 and August 2029 but this is due to external factors to DESNZ. These timeframes are also subject to projects individual circumstances and may change. There have been some projects requiring NZHF grant funding in the next financial year as opposed to 25/26 and relevant documentation has been completed to account for this. We are working with projects and LCCC to ensure DESNZ can support the continual progression of projects to reach COD.","startDate":"2022-07-20","endDate":"2042-06-30","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remains as 2042","fyBaseline":49.94,"fyForecast":4.83,"fyVariance":90.33,"varianceNarrative":"There is no variance to the HMT approved budget.","wholeLifeCost":2461.71,"costNarrative":"WLC are £2461.71m in Real Prices 24/25 as calculated by NISTA based on £2366m (DESNZ Real Prices Calendar Year 2023)","benefits":1336.98,"benefitsNarrative":"Benefits are £1366.98m in Real Prices 24/25 as calculated by NISTA based on £1285m (DESNZ Real Prices Calendar Year 2023)","themes":["Cost & funding","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors: 11 Projects have signed contracts. Although 1 project withdrew (Whitelee), the remaining 10 projects continue to progress to either reach FID and subsequently COD or are imminently…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"DESNZ_0334_2324-Q3","year":2024,"name":"Hydrogen Allocation Round 1 (HAR1)","department":"DESNZ","category":"Infrastructure and Construction","description":"The first joint electrolytic hydrogen allocation round (HAR1) offers both Hydrogen Production Business Model (HPBM) and Net Zero Hydrogen Fund (NZHF) support to first-of-a-kind electrolytic hydrogen projects. The HPBM is designed to provide a subsidy to low carbon hydrogen producers, helping them to overcome the operating cost gap between low carbon hydrogen and high carbon fossil fuels otherwise consumed. HAR1 is the first opportunity for Government to demonstrate that it is delivering on the ambition for up to 10GW of hydrogen production capacity by 2030. If the UK loses this opportunity to signal support to the hydrogen economy, it will be difficult to meet the investment levels needed to reach our deployment ambitions and build a UK supply chain of skills and components ready for global export.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. All 11 projects announced in Dec-23 remain in the process. The counterparty - Low Carbon Contracts Company (LCCC) is expected to offer contracts to successful projects from Summer 2024. The HAR1 scheme was published on the subsidy control transparency database on 13/02, detailing the whole life costs, and maximum amount given under this scheme. One month challenge window passed on 13/03 with no challenges being raised. Lessons learnt sessions have been completed across the last quarter on the key project phases to inform future allocation rounds and HAR1 delivery phase.","startDate":"2022-07-20","endDate":"2042-06-30","scheduleNarrative":"The project's end-date at 23/24-Q4 is 2042-06-30. This is primarily due to the following factors. All 11 successful projects remain in the process and contracts are expected to be signed from Summer 2024.","fyBaseline":15.5,"fyForecast":15.5,"fyVariance":0.0,"varianceNarrative":"The budget variance is inferior or equal to 5%.","wholeLifeCost":2366.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 23/24-Q4 is 2366m. This is primarily due to the following factors. HAR1 is on track to deliver the outcomes, costs profile and benefits as agreed through the Full Business Case in Nov-23 which includes: HPBM lifetime costs, NZHF lifetime Capital Expenditure, LCCC counterparty costs from FY 22/23 - 24/25. Future counterparty spend is subject to DESNZ business planning process.","benefits":1285.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 1285m. No deviation from approved monetised benefits position in Full Business Case. The monetised benefits are i) Carbon benefit - the value of the carbon emissions abated as a result of offtakers switching away from fossil fuel use, net of the emissions incurred in the production process (indirect emissions from electricity sourced from the grid). ii) Air quality benefit - the value of reduced air pollution as a result of offtakers switching away from fossil fuel use, net of pollution incurred in the production process (indirect emissions from electricity sourced from the grid). iii) Value of displaced fuels - the monetised benefit of not having to produce and use the fossil fuels that are being displaced by the hydrogen produced from HAR1 projects. iv) Productivity increases - the wage premium associated with creation of jobs to support the construction and operation of the HAR1 projects and associated indirect jobs in the supply chain.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. All 11 projects announced in Dec-23 remain in the process. The counterparty - Low Carbon Contracts Company (LCCC) is expected to offer contracts to successful projects from Summer 2024. The HAR1 scheme was published on…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"DESNZ_0334_2324-Q3","year":2025,"name":"Hydrogen Allocation Round 1 (HAR1)","department":"DESNZ","category":"Infrastructure and Construction","description":"The first joint electrolytic hydrogen allocation round (HAR1) offers both Hydrogen Production Business Model (HPBM) and Net Zero Hydrogen Fund (NZHF) support to first-of-a-kind electrolytic hydrogen projects. The HPBM is designed to provide a subsidy to low carbon hydrogen producers, helping them to overcome the operating cost gap between low carbon hydrogen and high carbon fossil fuels otherwise consumed. HAR1 is the first opportunity for Government to demonstrate that it is delivering on the ambition for up to 10GW of hydrogen production capacity by 2030. If the UK loses this opportunity to signal support to the hydrogen economy, it will be difficult to meet the investment levels needed to reach our deployment ambitions and build a UK supply chain of skills and components ready for global export. Since the Hydrogen Strategy was published in 2021, our understanding of the role of low carbon hydrogen has continued to evolve. Our knowledge of the system value of potential hydrogen use cases has increased in line with evidence, which indicates a future landscape of lower, more specific demand than previously assumed. In light of this and the Government’s mission-led approach we are planning an update to the UK’s Hydrogen Strategy, expected to be published in 2025.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ All 11 projects announced in Dec-23 remain in the process. The counterparty - Low Carbon Contracts Company (LCCC) is in the process of offering contracts to producers. Four projects have been agreed and contracts have been signed. For the remaining seven projects, we expect contract signature to take place by April/May. The first project is expected to reach commercial operational delivery by June 2025. The HAR1 funding mechanism, the Gas Shipper remains a key delivery enabler. The GSO consultation was published in January 2025 and the consultation period will close on 9 April 2025. DESNZ anticipate publishing the government response in December 2025 and expect the GSO to be operational in 2027.","startDate":"2022-07-20","endDate":"2042-06-30","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 30/06/2042. This is primarily due to the following factors‚ All 11 successful projects remain in the process and contracts are expected to be signed by Spring 2025..","fyBaseline":50.5,"fyForecast":0.0,"fyVariance":100.0,"varianceNarrative":"The budget variance is greater than or equal to 5% This is due to late contract signing and underspend due to only 6 projects signing as at 31.3.25, with the first signing in Dec 2024","wholeLifeCost":2366.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 2366. This is primarily due to the following factors‚ HAR1 is on track to deliver the outcomes, costs profile and benefits as agreed through the Full Business Case in Nov-23 which includes: HPBM lifetime costs, NZHF lifetime Capital Expenditure and LCCC counterparty costs. Future counterparty spend is subject to DESNZ business planning process.","benefits":1285.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 1285. This is primarily due to the following factors‚ the approved monetised benefits position in the Full Business Case remains the best available estimate of project’s benefits. The monetised benefits are: i) Carbon benefit - the value of the carbon emissions abated as a result of offtakers switching away from fossil fuel use, net of the emissions incurred in the production process (indirect emissions from electricity sourced from the grid). ii) Air quality benefit - the value of reduced air pollution as a result of offtakers switching away from fossil fuel use, net of pollution incurred in the production process (indirect emissions from electricity sourced from the grid). iii) Value of displaced fuels - the monetised benefit of not having to produce and use the fossil fuels that are being displaced by the hydrogen produced from HAR1 projects. iv) Productivity increases - the wage premium associated with creation of jobs to support the construction and operation of the HAR1 projects and associated indirect jobs in the supply chain.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ All 11 projects announced in Dec-23 remain in the process. The counterparty - Low Carbon Contracts Company (LCCC) is in the process of offering contracts to…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"DESNZ_0334_2324-Q3","year":2026,"name":"Hydrogen Allocation Round 1 (HAR1)","department":"DESNZ","category":"Infrastructure and Construction","description":"The first hydrogen allocation round (HAR1) offered both Hydrogen Production Business Model (HPBM) and Net Zero Hydrogen Fund (NZHF) support to first-of-a-kind electrolytic hydrogen projects. HAR1 aims to unlock private investment, accelerate early hydrogen deployment and support the growth of hydrogen supply chains, whilst contributing to long term decarbonisation and energy system resilience. HAR1 offered support to 11 projects, with the first project becoming operational in April 2026. The HPBM is designed to provide revenue support to low carbon hydrogen producers once their project is operational, helping them to overcome the operating cost gap between low carbon hydrogen and high carbon fossil fuels. Funding for the HPBM, confirmed at Budget 2024, will be exchequer funded until the introduction of the proposed Gas Shipper Obligation. The NZHF provides up to 20% capital expenditure (CAPEX) support for HAR 1 projects.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors: 11 Projects have signed contracts. Although 1 project withdrew (Whitelee), the remaining 10 projects continue to progress to either reach FID and subsequently COD or are imminently about to reach COD (HyMarnham April 2026). Remaining projects are expected to reach COD between August 2027 and August 2029 but this is due to external factors to DESNZ. These timeframes are also subject to projects individual circumstances and may change. There have been some projects requiring NZHF grant funding in the next financial year as opposed to 25/26 and relevant documentation has been completed to account for this. We are working with projects and LCCC to ensure DESNZ can support the continual progression of projects to reach COD.","startDate":"2022-07-20","endDate":"2042-06-30","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remains as 2042","fyBaseline":49.94,"fyForecast":4.83,"fyVariance":90.33,"varianceNarrative":"There is no variance to the HMT approved budget.","wholeLifeCost":2461.71,"costNarrative":"WLC are £2461.71m in Real Prices 24/25 as calculated by NISTA based on £2366m (DESNZ Real Prices Calendar Year 2023)","benefits":1336.98,"benefitsNarrative":"Benefits are £1366.98m in Real Prices 24/25 as calculated by NISTA based on £1285m (DESNZ Real Prices Calendar Year 2023)","themes":["Cost & funding","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors: 11 Projects have signed contracts. Although 1 project withdrew (Whitelee), the remaining 10 projects continue to progress to either reach FID and subsequently COD or are imminently…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"DESNZ_0334_2324-Q3","year":2025,"name":"Hydrogen Allocation Round 1 (HAR1)","department":"DESNZ","category":"Infrastructure and Construction","description":"The first joint electrolytic hydrogen allocation round (HAR1) offers both Hydrogen Production Business Model (HPBM) and Net Zero Hydrogen Fund (NZHF) support to first-of-a-kind electrolytic hydrogen projects. The HPBM is designed to provide a subsidy to low carbon hydrogen producers, helping them to overcome the operating cost gap between low carbon hydrogen and high carbon fossil fuels otherwise consumed. HAR1 is the first opportunity for Government to demonstrate that it is delivering on the ambition for up to 10GW of hydrogen production capacity by 2030. If the UK loses this opportunity to signal support to the hydrogen economy, it will be difficult to meet the investment levels needed to reach our deployment ambitions and build a UK supply chain of skills and components ready for global export. Since the Hydrogen Strategy was published in 2021, our understanding of the role of low carbon hydrogen has continued to evolve. Our knowledge of the system value of potential hydrogen use cases has increased in line with evidence, which indicates a future landscape of lower, more specific demand than previously assumed. In light of this and the Government’s mission-led approach we are planning an update to the UK’s Hydrogen Strategy, expected to be published in 2025.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ All 11 projects announced in Dec-23 remain in the process. The counterparty - Low Carbon Contracts Company (LCCC) is in the process of offering contracts to producers. Four projects have been agreed and contracts have been signed. For the remaining seven projects, we expect contract signature to take place by April/May. The first project is expected to reach commercial operational delivery by June 2025. The HAR1 funding mechanism, the Gas Shipper remains a key delivery enabler. The GSO consultation was published in January 2025 and the consultation period will close on 9 April 2025. DESNZ anticipate publishing the government response in December 2025 and expect the GSO to be operational in 2027.","startDate":"2022-07-20","endDate":"2042-06-30","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 30/06/2042. This is primarily due to the following factors‚ All 11 successful projects remain in the process and contracts are expected to be signed by Spring 2025..","fyBaseline":50.5,"fyForecast":0.0,"fyVariance":100.0,"varianceNarrative":"The budget variance is greater than or equal to 5% This is due to late contract signing and underspend due to only 6 projects signing as at 31.3.25, with the first signing in Dec 2024","wholeLifeCost":2366.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 2366. This is primarily due to the following factors‚ HAR1 is on track to deliver the outcomes, costs profile and benefits as agreed through the Full Business Case in Nov-23 which includes: HPBM lifetime costs, NZHF lifetime Capital Expenditure and LCCC counterparty costs. Future counterparty spend is subject to DESNZ business planning process.","benefits":1285.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 1285. This is primarily due to the following factors‚ the approved monetised benefits position in the Full Business Case remains the best available estimate of project’s benefits. The monetised benefits are: i) Carbon benefit - the value of the carbon emissions abated as a result of offtakers switching away from fossil fuel use, net of the emissions incurred in the production process (indirect emissions from electricity sourced from the grid). ii) Air quality benefit - the value of reduced air pollution as a result of offtakers switching away from fossil fuel use, net of pollution incurred in the production process (indirect emissions from electricity sourced from the grid). iii) Value of displaced fuels - the monetised benefit of not having to produce and use the fossil fuels that are being displaced by the hydrogen produced from HAR1 projects. iv) Productivity increases - the wage premium associated with creation of jobs to support the construction and operation of the HAR1 projects and associated indirect jobs in the supply chain.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ All 11 projects announced in Dec-23 remain in the process. The counterparty - Low Carbon Contracts Company (LCCC) is in the process of offering contracts to…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":0,"attentionScore":33,"attentionReasons":["Current published delivery confidence is Amber","In-year forecast variance is +90.3%"]},{"id":"MOD_0105_1617-Q1","year":2026,"name":"LAND ENVIRONMENT TACTICAL COMMUNICATION AND INFORMATION SYSTEMS","department":"MOD","category":"Military Capability","description":"The LETacCIS programme consists of multiple projects which deliver and sustain world-class tactical C4 capabilities, Command, Control, Communications and Computers, enabling the war-fighter to win, The programme includes projects that have already delivered equipment into service (Bowman), however under the new Army Operating Model, in-service capabilities are moving to HQ Fd Army. The LETacCIS programme is delivered by a partnership of Army Headquarters and Defence Digital’s Tactical Systems (TacSys) Service Executive, working as one team in collaboration with industry partners.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 increased to Amber. This is primarily due to the following factors. 1. Delivery continues and tangible progress is being made across multiple project lines. 2. Approval to maintain Heavy Forces communications via BCIP 5.7 remains affordable, and is awaiting Treasury approval. 3. The programme ambition to reset its delivery approach through a Strategic Outline Case has yet to be approved. 4. The programme is therefore operating at risk, pending Strategic Outline Case and wider Defence Investment Plan decisions.","startDate":"2013-10-16","endDate":"2035-12-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end date at 25/26-Q4 remained the same at 31/12/2035.","fyBaseline":255.1,"fyForecast":134.71,"fyVariance":47.19,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. 1. The financial year (FY) 25/26 position, shows an underspend against Control Total of £124.3M. This is driven by re‑profiling and delays across several smaller projects, including approvals, project cancellation/reset decisions and ongoing commercial negotiations.","wholeLifeCost":7734.29,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) increased from £8208M to £8375M. This is primarily due to the following factor. 1. An increase to Trinity Budget Whole Life Costs forecasts following ongoing negotiations with the supplier.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 increased to Amber. This is primarily due to the following factors. 1. Delivery continues and tangible progress is being made across multiple project lines. 2. Approval to maintain Heavy Forces communications via BCIP 5.7 remains affordable, and is…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"MOD_0105_1617-Q1","year":2020,"name":"Land Environment Tactical Communication and Information Systems","department":"MOD","category":"Military Capability","description":"A transformational change programme that will 'information-enable' the Land Environment in the full conduct of operations.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Provision of�narrative�not possible due to prioritisation of Covid 19 response","startDate":"2013-10-16","endDate":"2035-12-31","scheduleNarrative":"Provision of�narrative�not possible due to prioritisation of Covid 19 response","fyBaseline":235.38,"fyForecast":238.18,"fyVariance":1.0,"varianceNarrative":"Provision of�narrative�not possible due to prioritisation of Covid 19 response","wholeLifeCost":11399.76,"costNarrative":"Provision of�narrative�not possible due to prioritisation of Covid 19 response","benefits":null,"benefitsNarrative":"","themes":[],"evidenceExcerpt":"Provision of�narrative�not possible due to prioritisation of Covid 19 response Provision of�narrative�not possible due to prioritisation of Covid 19 response","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2020","sourceLabel":"IPA Annual Report 2019-20"},{"id":"MOD_0105_1617-Q1","year":2021,"name":"Land Environment Tactical Communication and Information Systems (LETacCIS)","department":"MOD","category":"Military Capability","description":"The Land Environment Tactical Communication and Information System programme is a military capability and business change programme that will deliver the Land Domain's deployed digital backbone in support of tactical (front line) users in the Army, Royal Marine, RAF Regiment and RAF Deployed Operating Bases. It will be achieved through the ongoing sustainment, evolution or replacement of Communication Information Systems and associated applications to underpin the transition to a Single Information Environment for users across Defence.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber. This is primarily due to the following factors: The Programme continues to make headway and is already delivering change, with the achievement on schedule of Full Operating Capability of a major upgrade of the in-service Bowman (BCIP 5.6) in December 2020. The 2020/21 period has also seen the Ministry Of Defences Investment Approval Committee approve business cases for both Project TRINITY (terrestrial broadband network in the field) and Project Dismounted Situational Awareness (end user radios, Information Technology and applications for the infantry). Both projects are now undergoing commercial activity with the marketplace, with a Pre Qualification Questionnaire and a competition for Design Services Partner respectively. In addition, a new pan-Programme Logistics Support Contract with Babcock was let in March 21.","startDate":"2013-05-01","endDate":"2035-12-31","scheduleNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","fyBaseline":247.27,"fyForecast":198.21,"fyVariance":-20.0,"varianceNarrative":"The budget variance exceeds 5%. This variance was generated primarily by delays to the MORPHEUS Sub-Programme, delays to contract negotiations and approvals delays.","wholeLifeCost":14351.53,"costNarrative":"Compared to financial year 19/20-Q2, the projects Baseline Whole Life Cost increased from �11399.76m to �14351.33m. This is primarily due to the following factors: The main cost driver has been MORPHEUS Sub-Programme which has had a number of significant and material cost increases in this period as the programme matures. Other factors are the 19/20-Q2 Budgeted baseline did not include the full Budget Provision for Year 10 (gap of �410m) which was a result of the timing of CT disaggregation. The programme has also expanded to include a number of projects such as NIOBE and AFV Headsets. The Whole Life Costs assessment has also been impacted by a review of the relevant Out of Service Dates to ensure they adhere to the correct planning assumptions.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber. This is primarily due to the following factors: The Programme continues to make headway and is already delivering change, with the achievement on schedule of Full Operating Capability of a major upgrade of the in-service…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21"},{"id":"MOD_0105_1617-Q1","year":2022,"name":"Land Environment Tactical Communication and Information Systems","department":"MOD","category":"Military Capability","description":"The Land Environment Tactical Communication and Information System programme is a military capability and business change programme that will deliver the Land Domain's deployed digital backbone in support of tactical (front line) users in the Army, Royal Marine, RAF Regiment and RAF Deployed Operating Bases. It will be achieved through the ongoing sustainment, evolution or replacement of Communication Information Systems and associated applications to underpin the transition to a Single Information Environment for users across Defence.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber. This is primarily due to the following factors: The health of the programme has not significantly changed over the past 12 months. There are significant gains being made in Dismounted Situational Awareness and Trinity. While some good progress has been made with Morpheus Open to Evolve system there are aspects of the software deveopment of the programme that needs more work.","startDate":"2013-05-01","endDate":"2035-12-31","scheduleNarrative":"Compared to 2021-Q4, the project end-date remained scheduled to finish on 31 December 35.","fyBaseline":155.69,"fyForecast":69.45,"fyVariance":-55.0,"varianceNarrative":"The budget variance exceeds 5%. The In-Year underspend was primarily generated by delays within Morpheus and the ongoing consideration of the Morpheus Assessment Phase 2 outputs.","wholeLifeCost":13140.0,"costNarrative":"Compared to 2021-Q4, the projects Baseline Whole Life Cost decreased from 13901.22 (£m) to 13140.44 (£m). This is primarily due to the following factors: The main cost driver to the change in Whole Life Cost has been Morpheus, with a re-baseline to recognise the schedule and cost impact of the General Dynamics Transition Partner contract delays, and the 37mth extension to the completion of the Evolve to Open Design and Development phase.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Scope & requirements","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber. This is primarily due to the following factors: The health of the programme has not significantly changed over the past 12 months. There are significant gains being made in Dismounted Situational Awareness and Trinity. While…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"MOD_0105_1617-Q1","year":2023,"name":"Land Environment Tactical Communication and Information Systems","department":"MOD","category":"Military Capability","description":"The Land Environment Tactical Communication and Information Systems programme is a capability and business change programme that will deliver the Land Domain's deployed digital backbone through the sustainment, evolution or replacement of Communication and Information Systems and associated applications to underpin the transition to a Single Information Environment.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. The programme remains on track, with significant gains being made in the Dismounted Situational Awareness, Multi-Mode Radio and Trinity projects. Discussions with General Dynamics Mission Systems (UK) on how best to deliver the totality of Morpheus are continuing.","startDate":"2013-05-01","endDate":"2035-12-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2035-12-31. This is primarily due to the following factors. NA","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","wholeLifeCost":13523.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 increased from 13140m. to 13523m. This is primarily due to the following factors. The impact of inflation, alignment of Morpheus, implementation of the Bowman Combat Infrastructure and Platform Sustainment Future Change Request and Trinity contract negotiations.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This programme does not report cashable benefits. Its aim is to provision the armed forces with the equipment and / or infrastructure required.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. The programme remains…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"MOD_0105_1617-Q1","year":2024,"name":"Land Environment Tactical Communication and Information Systems","department":"MOD","category":"Military Capability","description":"The LETacCIS programme consists of multiple projects with the aim of delivering the next generation of tactical military communications in the Land Environment, and providing the means to make informed and timely decisions, enabled by agile Communication Information Systems (CIS). The LETacCIS programme is delivered by a partnership of Army Headquarters and Defence Digital’s Tactical Systems (TacSys) Service Executive, working as one team in collaboration with key industry partners.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to Financial Year 22/23-Q4, the Infrastructure and Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors: Following a review of requirements under Project IRIS of the Land Domain Deployed Digital Ecosystem, and a reprofiling of the MORPHEUS Control Total, there is now an associated pause to realign MORPHEUS. This will require further capability enhancement to Bowman Combat Infrastructure and Platform (BCIP) to mitigate the delay to MORPHEUS, in addition to BCIP security and operating system obsolescence. The wider programme funding remains unaltered, with no impact to the other major change projects (ie. BCIP 5.7, DSA and TRINITY).","startDate":"2013-10-16","endDate":"2035-12-31","scheduleNarrative":"Compared to Financial Year 22/23-Q4, the project's end-date at 23/24-Q4 remained scheduled to finish on 2035-12-31. This is primarily due to the following factors: Whilst the Balance of Investment (BoI) decision made in Q3 will delay MORPEHUS, and there has been slippage in DSA and TRINITY, the schedule for the programme overall remains on track. Regaining momentum on TRINITY (now on contract) is achievable and work is underway. DSA will be subject to a thorough review of its delivery strategy and timeline, with a re-baselined schedule to follow in 2024/25 once the analysis is complete.","fyBaseline":174.8,"fyForecast":136.18,"fyVariance":-22.094,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The Programme forecast currently shows an underspend against Control Total of £39M, related to prioritisation decisions related to MORPHEUS and Dismounted Situational Awareness (DSA).","wholeLifeCost":13431.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 decreased from 13523m to 13431m. This is primarily due to the following factors. The main cost driver to the reduction in WLC has been the termination of project NIOBE and subsequent removal of In Year and future Control Totals. Previous Balance of Investment (BoI) decisions resulted in a reprofiling to Project MORPHEUS (a major LETacCIS Cat A project). The Budget Whole Life Cost (WLC) does not currently reflect the BoI reprofile.","benefits":0.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 0m.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Approvals & decisions"],"evidenceExcerpt":"Compared to Financial Year 22/23-Q4, the Infrastructure and Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors: Following a review of requirements under Project IRIS of the Land Domain Deployed Digital Ecosystem, and a reprofiling of the MORPHEUS Control Total, there is now…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"MOD_0105_1617-Q1","year":2025,"name":"LAND ENVIRONMENT TACTICAL COMMUNICATION AND INFORMATION SYSTEMS","department":"MoD","category":"Military Capability","description":"The LETacCIS programme consists of multiple projects with the aim of `delivering and sustaining world-class tactical Command, Control, Communications, Computers and Information (C4I) capabilities, enabling the war-fighter to win`. The programme includes projects that have already delivered equipment into service. However under the (2022) Army Operating Model, in-service capabilities are in the process of moving to HQ Field Army. The LETacCIS programme is deliveRed by a partnership of Army Headquarters and Defence Digital’s Tactical Systems (TacSys) Service Executive, working as one team in collaboration with industry partners.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 decreased from AMBER to RED. This is primarily due to the following factors. Following a review of requirement under Project IRIS and a reprofiling of the Control Total, the original plans for Project MORPHEUS have been paused. The outcomes sought for MORPHEUS will now be delivered through Land Domain Command, Control, Communications, Computers and Information (C4I) Activity. TRINITY and Land Deployable Gateway Version 2 (LDGv2) are on contract within the programme. The overall health of the programme remains Red.","startDate":"2013-10-16","endDate":"2035-12-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/12/2035.","fyBaseline":160.75,"fyForecast":70.56,"fyVariance":56.11,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The financial year (FY)24/25 position, as at Feb 2025, shows an underspend against Control Total of £90.2M. The material drivers of the In Year underspend are related to Evolve to Open (EvO), Multi-Mode Radio (MMR), DSA and TRINITY. EvO expenditure has reduced in line with TacSys Resource Partner (TRP) efficiencies and realism following the Workforce Cost Envelope review and recruitment freeze. Following the Centre led IY Capital Expenditure Limit (CDEL) blight, MMR purchase has been deferRed into FY25/26. DSA expenditure has been delayed following the decision to reset the project. TRINITY expenditure has been Reduced due to ongoing negotiations with BAE Systems.","wholeLifeCost":8208.31,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 13431 to 8208. This is primarily due to the following factors. Annual Budgetary Cycle (ABC)24 Balance of Investment decisions which resulted in a reprofiling to Project MORPHEUS (a major LETacCIS Cat A project) of £1.3Bn over 10 years. This has now been reflected in the costed programme, along with the associated future years costs, and is the main cost driver to the reduction in WLC.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Governance & assurance","Scope & requirements","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 decreased from AMBER to RED. This is primarily due to the following factors. Following a review of requirement under Project IRIS and a reprofiling of the Control Total, the original plans for Project MORPHEUS have been paused. The outcomes sought for MORPHEUS will…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"MOD_0105_1617-Q1","year":2026,"name":"LAND ENVIRONMENT TACTICAL COMMUNICATION AND INFORMATION SYSTEMS","department":"MOD","category":"Military Capability","description":"The LETacCIS programme consists of multiple projects which deliver and sustain world-class tactical C4 capabilities, Command, Control, Communications and Computers, enabling the war-fighter to win, The programme includes projects that have already delivered equipment into service (Bowman), however under the new Army Operating Model, in-service capabilities are moving to HQ Fd Army. The LETacCIS programme is delivered by a partnership of Army Headquarters and Defence Digital’s Tactical Systems (TacSys) Service Executive, working as one team in collaboration with industry partners.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 increased to Amber. This is primarily due to the following factors. 1. Delivery continues and tangible progress is being made across multiple project lines. 2. Approval to maintain Heavy Forces communications via BCIP 5.7 remains affordable, and is awaiting Treasury approval. 3. The programme ambition to reset its delivery approach through a Strategic Outline Case has yet to be approved. 4. The programme is therefore operating at risk, pending Strategic Outline Case and wider Defence Investment Plan decisions.","startDate":"2013-10-16","endDate":"2035-12-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end date at 25/26-Q4 remained the same at 31/12/2035.","fyBaseline":255.1,"fyForecast":134.71,"fyVariance":47.19,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. 1. The financial year (FY) 25/26 position, shows an underspend against Control Total of £124.3M. This is driven by re‑profiling and delays across several smaller projects, including approvals, project cancellation/reset decisions and ongoing commercial negotiations.","wholeLifeCost":7734.29,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) increased from £8208M to £8375M. This is primarily due to the following factor. 1. An increase to Trinity Budget Whole Life Costs forecasts following ongoing negotiations with the supplier.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 increased to Amber. This is primarily due to the following factors. 1. Delivery continues and tangible progress is being made across multiple project lines. 2. Approval to maintain Heavy Forces communications via BCIP 5.7 remains affordable, and is…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"MOD_0105_1617-Q1","year":2025,"name":"LAND ENVIRONMENT TACTICAL COMMUNICATION AND INFORMATION SYSTEMS","department":"MoD","category":"Military Capability","description":"The LETacCIS programme consists of multiple projects with the aim of `delivering and sustaining world-class tactical Command, Control, Communications, Computers and Information (C4I) capabilities, enabling the war-fighter to win`. The programme includes projects that have already delivered equipment into service. However under the (2022) Army Operating Model, in-service capabilities are in the process of moving to HQ Field Army. The LETacCIS programme is deliveRed by a partnership of Army Headquarters and Defence Digital’s Tactical Systems (TacSys) Service Executive, working as one team in collaboration with industry partners.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 decreased from AMBER to RED. This is primarily due to the following factors. Following a review of requirement under Project IRIS and a reprofiling of the Control Total, the original plans for Project MORPHEUS have been paused. The outcomes sought for MORPHEUS will now be delivered through Land Domain Command, Control, Communications, Computers and Information (C4I) Activity. TRINITY and Land Deployable Gateway Version 2 (LDGv2) are on contract within the programme. The overall health of the programme remains Red.","startDate":"2013-10-16","endDate":"2035-12-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/12/2035.","fyBaseline":160.75,"fyForecast":70.56,"fyVariance":56.11,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The financial year (FY)24/25 position, as at Feb 2025, shows an underspend against Control Total of £90.2M. The material drivers of the In Year underspend are related to Evolve to Open (EvO), Multi-Mode Radio (MMR), DSA and TRINITY. EvO expenditure has reduced in line with TacSys Resource Partner (TRP) efficiencies and realism following the Workforce Cost Envelope review and recruitment freeze. Following the Centre led IY Capital Expenditure Limit (CDEL) blight, MMR purchase has been deferRed into FY25/26. DSA expenditure has been delayed following the decision to reset the project. TRINITY expenditure has been Reduced due to ongoing negotiations with BAE Systems.","wholeLifeCost":8208.31,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 13431 to 8208. This is primarily due to the following factors. Annual Budgetary Cycle (ABC)24 Balance of Investment decisions which resulted in a reprofiling to Project MORPHEUS (a major LETacCIS Cat A project) of £1.3Bn over 10 years. This has now been reflected in the costed programme, along with the associated future years costs, and is the main cost driver to the reduction in WLC.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Governance & assurance","Scope & requirements","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 decreased from AMBER to RED. This is primarily due to the following factors. Following a review of requirement under Project IRIS and a reprofiling of the Control Total, the original plans for Project MORPHEUS have been paused. The outcomes sought for MORPHEUS will…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":-1,"transition":"Improved","endDateDeltaDays":0,"attentionScore":33,"attentionReasons":["Current published delivery confidence is Amber","In-year forecast variance is +47.2%"]},{"id":"HO_0331_2324-Q4","year":2026,"name":"Police National Database (PND)","department":"HO","category":"Information and Communications Technology (ICT)","description":"The Home Office, in partnership with the National Police Chiefs’ Council (NPCC), delivers the Police National Database (PND), a national intelligence system enabling information sharing across police forces and law enforcement agencies. The system supports safeguarding, crime prevention and detection, and the protection of communities. PND is designated Critical National Infrastructure (CNI), with all users required to complete College of Policing training. In January 2024, the programme received approval for a £385.6m whole-life Full Business Case to deliver the PND 1.5 Transformation, aiming to extend service life, address technical debt, enable cloud migration, and modernise the service. Delivery challenges led to the programme being paused in June 2025. A revised delivery approach was subsequently adopted, focusing on stabilisation and sustainment through insourcing services into a Home Office data centre and addressing risks associated with legacy systems. This approach, and associated funding, was approved by the Investment Committee in March 2026. The programme is now focused on maintaining service continuity, transitioning away from the existing supplier arrangement, stabilising operations, and undertaking discovery to inform longer-term transformation options.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"At Q4 2025/26, the programme’s Delivery Confidence Assessment (DCA) improved to Amber (from Q4 2024/25). This reflects increased confidence following the decision to revise the delivery approach and focus on insourcing the PND service. Progress has been made in addressing delivery risks and constraints, including the development and review of a supplier-led plan to support insourcing. A refreshed Programme Business Case was developed and approved by the Home Office Investment Committee, supported by engagement with key stakeholders, including policing partners. In January 2026, the programme underwent an Assurance of Action Plan Review, which resulted in an Amber rating. The review recognised improvements in programme delivery confidence, supported by strengthened stakeholder engagement, effective communications, and a continued focus on collaboration and knowledge sharing.","startDate":"2024-01-18","endDate":null,"scheduleNarrative":"At Q4 2025/26, the forecast end date moved from 31 March 2026 to 27 October 2027. This reflects the revised delivery approach following the decision to pivot to an insourcing model. A delivery plan was developed with the incumbent supplier to support transition and contract exit, including an updated exit plan covering service transition arrangements. This plan sets out key milestones aligned to the insourcing approach, with delivery expected to commence in April 2026, service transition completed by July 2027, and an early-life support period extending to October 2027. The revised schedule reflects the prioritisation of a safe and secure transition, given the Critical National Infrastructure status of PND.","fyBaseline":53.69,"fyForecast":13.84,"fyVariance":74.22,"varianceNarrative":"At Q4 2025/26, the programme reports a budget variance exceeding 5%. This reflects the revised delivery approach following the decision to pivot to an insourcing model. The change in approach was driven by risks to service continuity, including the ageing platform, increasing instability, and its inability to meet modern security standards. The revised Programme Business Case therefore prioritises service sustainment, continuity, and essential preparatory activity to enable future transformation. As a result of replanning, in-year costs have reduced, reflecting the pause in previously planned transformation activity and associated milestone payments. The revised scope also results in a reduction in whole-life cost and associated benefits compared to earlier forecasts.","wholeLifeCost":282.64,"costNarrative":"At Q4 2025/26, the departmentally agreed Whole Life Cost decreased from £387.64m to £289.42m. This reflects the revised delivery approach following the decision to pivot to an insourcing model. The change in approach was driven by risks to service continuity, including the ageing platform, increasing instability, and its inability to meet modern security standards. The revised Programme Business Case therefore prioritises service sustainment, continuity, and essential preparatory activity to enable future transformation. As a result of replanning, in year costs have reduced due to the pause in previously planned transformation activity and associated milestone payments. The reduced scope also results in a lower overall whole-life cost and a corresponding reduction in forecast benefits.","benefits":39.75,"benefitsNarrative":"At Q4 2025/26, the departmentally agreed benefits decreased from £639.31m to £43.1m. This reflects the revised delivery approach following the decision to pivot to an insourcing model. The change in approach was driven by risks to service continuity, including the ageing platform, increasing instability, and its inability to meet modern security standards. The revised Programme Business Case therefore prioritises service sustainment, continuity, and essential preparatory activity to enable future transformation. As a result of replanning and the reduced scope of transformation activity, forecast benefits have decreased. However, the longer-term benefits associated with modernisation and transformation remain achievable and will be explored through a future Business Case.","themes":["Delivery & schedule","Approvals & decisions","Cost & funding","Governance & assurance"],"evidenceExcerpt":"At Q4 2025/26, the programme’s Delivery Confidence Assessment (DCA) improved to Amber (from Q4 2024/25). This reflects increased confidence following the decision to revise the delivery approach and focus on insourcing the PND service. Progress has been made in addressing delivery risks and constraints, including the development and review of a supplier-led…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"HO_0331_2324-Q4","year":2024,"name":"Police National Database (PND)","department":"HO","category":"ICT","description":"The Police National Database (PND) provides an aggregation of Crime, Intelligence, Custody, Child Protection, and Domestic Violence data held on local police systems. Information is held as a single national POLE store (People, Objects, Locations, Events), algorithms on the PND match people, vehicles and phone numbers and present a consolidated view._x000D_ The PND holds information on Organised Crime Groups, modern slavery, and county lines and provides national capability for searching police custody images. The PND is essential for operational policing in safeguarding children and vulnerable people, countering terrorism, crime prevention, and tackling serious and organised crime. It is deemed Critical National Infrastructure; without the PND risk to public safety would increase as intelligence would not be accessed nationally by Police Forces._x000D_ _x000D_ The PND programme is delivering a transformed service to better meet policing needs, replace, or upgrade obsolescent technology, move to Cloud, and secure service continuity to the 10yr+ horizon.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. PND Programme is reporting an Amber RAG status as Full Business Case (FBC) for full scope of programme was approved and funded at InvestCo on 18th Jan 24. A Fixed Price Proposal for delivery of PND 1.5 Transformation programme was subsequently signed on 19th Jan 24. PND 1.5 Transformation is expected to be delivered by June 2025._x000D_ _x000D_ Programme has completed two Critical, one Essential and one Recommended recommendation from Gate 3 Review in Dec 23, programme is on track to complete the other six Recommended recommendations.","startDate":"2024-01-18","endDate":"2026-03-31","scheduleNarrative":"The project's end-date at 23/24-Q4 is 2026-03-31. This is primarily due to the following factors. Contract with incumbent supplier terminates 31 Mar 26, however the forecasted date for end of Procurement project and transition to new contract is 29 Jan 27. Focus on approval for PND 1.5 Full Business Case has delayed commencement of PND Procurement. Progress of PND 1.5 Transformation programme and dependencies mean requirements are likely to change, this is delaying release of the Invitation to Tender (ITT) to the market._x000D_ _x000D_ The PND 1.5 Transformation programme is expected to be delivered by Oct 25.","fyBaseline":41.82,"fyForecast":41.82,"fyVariance":0.0,"varianceNarrative":"The budget variance is inferior or equal to 5%.","wholeLifeCost":395.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 23/24-Q4 is 395m. This is primarily due to the following factors. This is made up of 146.7m (CDEL), the majority of these costs are funding the PND 1.5 Transformation programme including new Hosting Platform costs (LECP). 248.4m (RDEL) is costs for implementing sustainment activity and business change pipeline.","benefits":639.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 639m. To develop and appraise the benefits profile the programme team has worked closely with Home Office Analysis and Insight (HOAI), Central Economic Unit (CEU) economists and conducted a series of workshops and 1-to-1 interviews with PND police subject matter experts (SME's) attached to the programme team, PND training staff from the College of Policing (CoP), and experienced PND users from forces and non-police law enforcement (LE) and regulatory bodies. _x000D_ All the benefits quantified and monetised are achieved through the delivery of the PND 1.5 Transformation programme. A description of each monetised benefit is found in section 1.05 (1.05.01 - 1.05.05)_x000D_ _x000D_ It has not been possible to quantify and monetise all identified benefits. A description of these non-monetised benefits, that the programme is relatively confident of PND 1.5 Transformation programme materialising, are described in section 1.05 (1.05.05 - 1.05.10).","themes":["Commercial & supply chain","Cost & funding","Approvals & decisions","Delivery & schedule"],"evidenceExcerpt":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. PND Programme is reporting an Amber RAG status as Full Business Case (FBC) for full scope of programme was approved and funded at InvestCo on 18th Jan 24. A Fixed Price Proposal for delivery of PND 1.5 Transformation…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"HO_0331_2324-Q4","year":2025,"name":"Police National Database (PND)","department":"HO","category":"ICT","description":"Police National Database (PND) Programme aims to: • Ensure Business Continuity of the PND Service as Critical National Infrastructure (CNI) to a 5-10 year horizon • Transition PND to cloud-native architecture and migrate hosting to the Law Enforcement Cloud Platform (LECP) • Replace or update obsolescent technology components, specifically Oracle database & middleware, and Initiate names matching which is unsupported • Improve the usability of the system, be intuitive and easy to navigate, with viewable and meaningful search results that can be exported and shared as required by operational policing • Deliver PND Application Programming Interface (APIs) that enable export and analysis of PND data and expose APIs for federated searching across national police data sets • Enable PND to continue to act as a national source of info for organised crime, organised crime groups, including county lines, modern slavery, and human trafficking until such time as it replaced by the future data strategy agreed by policing and Public Safety Group (PSG) • From a Commercial perspective the HO will need to align the migration to Law Enforcement Cloud Platform (LECP) and transition to a new contract for run, maintenance and support (the current contract with the incumbent supplier is due to expire end of March 2026. On the 15th May Investment Committee rejected the suppliers Contract Change Notice. As a result, the board approved a pivot in delivery to in source the service, negating the need for a procurement to be run.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 decreased from AMBER to RED. This is primarily due to the following factors‚ Ten months ago, the Home Office received a Milestone Impact Assessment highlighting a five-month delay to delivery. Since then, the Home Office has collaborated closely with the supplier to undertake a comprehensive review of the end-to-end delivery plan. This included significantly increasing commercial support and initiating a full programme reset. On 15 May 2025, the Investment Committee (InvestCo) declined the proposed Contract Change Notification and instead chose to pursue a contingency option. The programme is now preparing for a further NISTA-led Gate 0/3 Review, which will evaluate the progress of the contingency approach and inform updates to the Full Business Case ahead of the next InvestCo meeting in December 2025.","startDate":"2024-01-18","endDate":"2026-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2026. This is primarily due to the following factors‚ Ten months ago, the Home Office received a Milestone Impact Assessment highlighting a five-month delay to delivery. Since then, the Home Office has collaborated closely with the supplier to undertake a comprehensive review of the end-to-end delivery plan. This included significantly increasing commercial support and initiating a full programme reset. On 15 May 2025, the Investment Committee (InvestCo) declined the proposed Contract Change Notification and instead chose to pursue a contingency option. The programme is now preparing for a further NISTA-led Gate 0/3 Review, which will evaluate the progress of the contingency approach and inform updates to the Full Business Case ahead of the next InvestCo meeting in December 2025.","fyBaseline":77.93,"fyForecast":55.66,"fyVariance":28.58,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The programme has suffered some delays in delivery and subsequently some planned delivery milestone payments have not yet fallen due.","wholeLifeCost":387.64,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 395 to 387. This is primarily due to the following factors‚ The cause for a decrease in Whole Life Costs is due to the removal of optimism bias costs from the previous financial year 2024/2025.","benefits":639.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 639. This is primarily due to the following factors‚ The programme is updating a revised version of the business case by December 2025. This will include a full review of the strategic objectives and benefits. However, our initial assessment shows that majority are still achievable, even through delivery of a contingency option.","themes":["Delivery & schedule","Cost & funding","Commercial & supply chain","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 decreased from AMBER to RED. This is primarily due to the following factors‚ Ten months ago, the Home Office received a Milestone Impact Assessment highlighting a five-month delay to delivery. Since then, the Home Office has…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"HO_0331_2324-Q4","year":2026,"name":"Police National Database (PND)","department":"HO","category":"Information and Communications Technology (ICT)","description":"The Home Office, in partnership with the National Police Chiefs’ Council (NPCC), delivers the Police National Database (PND), a national intelligence system enabling information sharing across police forces and law enforcement agencies. The system supports safeguarding, crime prevention and detection, and the protection of communities. PND is designated Critical National Infrastructure (CNI), with all users required to complete College of Policing training. In January 2024, the programme received approval for a £385.6m whole-life Full Business Case to deliver the PND 1.5 Transformation, aiming to extend service life, address technical debt, enable cloud migration, and modernise the service. Delivery challenges led to the programme being paused in June 2025. A revised delivery approach was subsequently adopted, focusing on stabilisation and sustainment through insourcing services into a Home Office data centre and addressing risks associated with legacy systems. This approach, and associated funding, was approved by the Investment Committee in March 2026. The programme is now focused on maintaining service continuity, transitioning away from the existing supplier arrangement, stabilising operations, and undertaking discovery to inform longer-term transformation options.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"At Q4 2025/26, the programme’s Delivery Confidence Assessment (DCA) improved to Amber (from Q4 2024/25). This reflects increased confidence following the decision to revise the delivery approach and focus on insourcing the PND service. Progress has been made in addressing delivery risks and constraints, including the development and review of a supplier-led plan to support insourcing. A refreshed Programme Business Case was developed and approved by the Home Office Investment Committee, supported by engagement with key stakeholders, including policing partners. In January 2026, the programme underwent an Assurance of Action Plan Review, which resulted in an Amber rating. The review recognised improvements in programme delivery confidence, supported by strengthened stakeholder engagement, effective communications, and a continued focus on collaboration and knowledge sharing.","startDate":"2024-01-18","endDate":null,"scheduleNarrative":"At Q4 2025/26, the forecast end date moved from 31 March 2026 to 27 October 2027. This reflects the revised delivery approach following the decision to pivot to an insourcing model. A delivery plan was developed with the incumbent supplier to support transition and contract exit, including an updated exit plan covering service transition arrangements. This plan sets out key milestones aligned to the insourcing approach, with delivery expected to commence in April 2026, service transition completed by July 2027, and an early-life support period extending to October 2027. The revised schedule reflects the prioritisation of a safe and secure transition, given the Critical National Infrastructure status of PND.","fyBaseline":53.69,"fyForecast":13.84,"fyVariance":74.22,"varianceNarrative":"At Q4 2025/26, the programme reports a budget variance exceeding 5%. This reflects the revised delivery approach following the decision to pivot to an insourcing model. The change in approach was driven by risks to service continuity, including the ageing platform, increasing instability, and its inability to meet modern security standards. The revised Programme Business Case therefore prioritises service sustainment, continuity, and essential preparatory activity to enable future transformation. As a result of replanning, in-year costs have reduced, reflecting the pause in previously planned transformation activity and associated milestone payments. The revised scope also results in a reduction in whole-life cost and associated benefits compared to earlier forecasts.","wholeLifeCost":282.64,"costNarrative":"At Q4 2025/26, the departmentally agreed Whole Life Cost decreased from £387.64m to £289.42m. This reflects the revised delivery approach following the decision to pivot to an insourcing model. The change in approach was driven by risks to service continuity, including the ageing platform, increasing instability, and its inability to meet modern security standards. The revised Programme Business Case therefore prioritises service sustainment, continuity, and essential preparatory activity to enable future transformation. As a result of replanning, in year costs have reduced due to the pause in previously planned transformation activity and associated milestone payments. The reduced scope also results in a lower overall whole-life cost and a corresponding reduction in forecast benefits.","benefits":39.75,"benefitsNarrative":"At Q4 2025/26, the departmentally agreed benefits decreased from £639.31m to £43.1m. This reflects the revised delivery approach following the decision to pivot to an insourcing model. The change in approach was driven by risks to service continuity, including the ageing platform, increasing instability, and its inability to meet modern security standards. The revised Programme Business Case therefore prioritises service sustainment, continuity, and essential preparatory activity to enable future transformation. As a result of replanning and the reduced scope of transformation activity, forecast benefits have decreased. However, the longer-term benefits associated with modernisation and transformation remain achievable and will be explored through a future Business Case.","themes":["Delivery & schedule","Approvals & decisions","Cost & funding","Governance & assurance"],"evidenceExcerpt":"At Q4 2025/26, the programme’s Delivery Confidence Assessment (DCA) improved to Amber (from Q4 2024/25). This reflects increased confidence following the decision to revise the delivery approach and focus on insourcing the PND service. Progress has been made in addressing delivery risks and constraints, including the development and review of a supplier-led…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"HO_0331_2324-Q4","year":2025,"name":"Police National Database (PND)","department":"HO","category":"ICT","description":"Police National Database (PND) Programme aims to: • Ensure Business Continuity of the PND Service as Critical National Infrastructure (CNI) to a 5-10 year horizon • Transition PND to cloud-native architecture and migrate hosting to the Law Enforcement Cloud Platform (LECP) • Replace or update obsolescent technology components, specifically Oracle database & middleware, and Initiate names matching which is unsupported • Improve the usability of the system, be intuitive and easy to navigate, with viewable and meaningful search results that can be exported and shared as required by operational policing • Deliver PND Application Programming Interface (APIs) that enable export and analysis of PND data and expose APIs for federated searching across national police data sets • Enable PND to continue to act as a national source of info for organised crime, organised crime groups, including county lines, modern slavery, and human trafficking until such time as it replaced by the future data strategy agreed by policing and Public Safety Group (PSG) • From a Commercial perspective the HO will need to align the migration to Law Enforcement Cloud Platform (LECP) and transition to a new contract for run, maintenance and support (the current contract with the incumbent supplier is due to expire end of March 2026. On the 15th May Investment Committee rejected the suppliers Contract Change Notice. As a result, the board approved a pivot in delivery to in source the service, negating the need for a procurement to be run.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 decreased from AMBER to RED. This is primarily due to the following factors‚ Ten months ago, the Home Office received a Milestone Impact Assessment highlighting a five-month delay to delivery. Since then, the Home Office has collaborated closely with the supplier to undertake a comprehensive review of the end-to-end delivery plan. This included significantly increasing commercial support and initiating a full programme reset. On 15 May 2025, the Investment Committee (InvestCo) declined the proposed Contract Change Notification and instead chose to pursue a contingency option. The programme is now preparing for a further NISTA-led Gate 0/3 Review, which will evaluate the progress of the contingency approach and inform updates to the Full Business Case ahead of the next InvestCo meeting in December 2025.","startDate":"2024-01-18","endDate":"2026-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2026. This is primarily due to the following factors‚ Ten months ago, the Home Office received a Milestone Impact Assessment highlighting a five-month delay to delivery. Since then, the Home Office has collaborated closely with the supplier to undertake a comprehensive review of the end-to-end delivery plan. This included significantly increasing commercial support and initiating a full programme reset. On 15 May 2025, the Investment Committee (InvestCo) declined the proposed Contract Change Notification and instead chose to pursue a contingency option. The programme is now preparing for a further NISTA-led Gate 0/3 Review, which will evaluate the progress of the contingency approach and inform updates to the Full Business Case ahead of the next InvestCo meeting in December 2025.","fyBaseline":77.93,"fyForecast":55.66,"fyVariance":28.58,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The programme has suffered some delays in delivery and subsequently some planned delivery milestone payments have not yet fallen due.","wholeLifeCost":387.64,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 395 to 387. This is primarily due to the following factors‚ The cause for a decrease in Whole Life Costs is due to the removal of optimism bias costs from the previous financial year 2024/2025.","benefits":639.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 639. This is primarily due to the following factors‚ The programme is updating a revised version of the business case by December 2025. This will include a full review of the strategic objectives and benefits. However, our initial assessment shows that majority are still achievable, even through delivery of a contingency option.","themes":["Delivery & schedule","Cost & funding","Commercial & supply chain","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 decreased from AMBER to RED. This is primarily due to the following factors‚ Ten months ago, the Home Office received a Milestone Impact Assessment highlighting a five-month delay to delivery. Since then, the Home Office has…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":-1,"transition":"Improved","endDateDeltaDays":null,"attentionScore":33,"attentionReasons":["Current published delivery confidence is Amber","In-year forecast variance is +74.2%"]},{"id":"MOJ_0539_2526-Q2","year":2026,"name":"Residential Property Tribunal","department":"MOJ","category":"Government Transformation and Service Delivery","description":"The Residential Property Tribunal (RPT) Project is responsible for delivering HMCTS’s responsibilities arising from the Renters Rights Act (RRA), introduced by Ministry of Housing Communities and Local Government (MHCLG). The project is delivering new operating delivery models, tactical and strategic IT solutions, recruitment of staff and the estate space to house them, alongside wider legislative implementation as well as judicial and subject matter expert recruitment activities.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Delivery Confidence Assessment (DCA) for financial year 25/26-Q4 is Amber. This is driven by complexities in aligning policy, legal and delivery partners on future digitalisation.","startDate":"2024-06-11","endDate":"2028-03-31","scheduleNarrative":"The project's end date at 25/26-Q4 is scheduled for 31/03/2028. This is primarily due to the following factors‚ The project is on track to deliver against the baseline schedule.","fyBaseline":27.08,"fyForecast":5.73,"fyVariance":78.84,"varianceNarrative":"The budget exceeds 5%. In year variance against budget primarily driven by delays in design, discovery and recruitment as a result of the delays in the Bill acquiring Royal Assent.","wholeLifeCost":149.6,"costNarrative":"The project's Whole Life Costs in 25/26-Q4 are £149.6m. The Whole Life Costs are based on the most recent business case and include optimism bias. All costs have been reported in 2024/25 base prices in line with NISTA requirements. This is a change from previous years where costs were reported in nominal prices. All costs reflect this accounting reduction regardless of any actual changes.","benefits":null,"benefitsNarrative":"There are no monetised benefits to the project.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Scope & requirements"],"evidenceExcerpt":"The Delivery Confidence Assessment (DCA) for financial year 25/26-Q4 is Amber. This is driven by complexities in aligning policy, legal and delivery partners on future digitalisation. The project's end date at 25/26-Q4 is scheduled for 31/03/2028. This is primarily due to the following factors‚ The project is on track to deliver against the baseline…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"MOJ_0539_2526-Q2","year":2026,"name":"Residential Property Tribunal","department":"MOJ","category":"Government Transformation and Service Delivery","description":"The Residential Property Tribunal (RPT) Project is responsible for delivering HMCTS’s responsibilities arising from the Renters Rights Act (RRA), introduced by Ministry of Housing Communities and Local Government (MHCLG). The project is delivering new operating delivery models, tactical and strategic IT solutions, recruitment of staff and the estate space to house them, alongside wider legislative implementation as well as judicial and subject matter expert recruitment activities.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Delivery Confidence Assessment (DCA) for financial year 25/26-Q4 is Amber. This is driven by complexities in aligning policy, legal and delivery partners on future digitalisation.","startDate":"2024-06-11","endDate":"2028-03-31","scheduleNarrative":"The project's end date at 25/26-Q4 is scheduled for 31/03/2028. This is primarily due to the following factors‚ The project is on track to deliver against the baseline schedule.","fyBaseline":27.08,"fyForecast":5.73,"fyVariance":78.84,"varianceNarrative":"The budget exceeds 5%. In year variance against budget primarily driven by delays in design, discovery and recruitment as a result of the delays in the Bill acquiring Royal Assent.","wholeLifeCost":149.6,"costNarrative":"The project's Whole Life Costs in 25/26-Q4 are £149.6m. The Whole Life Costs are based on the most recent business case and include optimism bias. All costs have been reported in 2024/25 base prices in line with NISTA requirements. This is a change from previous years where costs were reported in nominal prices. All costs reflect this accounting reduction regardless of any actual changes.","benefits":null,"benefitsNarrative":"There are no monetised benefits to the project.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Scope & requirements"],"evidenceExcerpt":"The Delivery Confidence Assessment (DCA) for financial year 25/26-Q4 is Amber. This is driven by complexities in aligning policy, legal and delivery partners on future digitalisation. The project's end date at 25/26-Q4 is scheduled for 31/03/2028. This is primarily due to the following factors‚ The project is on track to deliver against the baseline…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":null,"ratingDelta":null,"transition":"Not comparable","endDateDeltaDays":null,"attentionScore":33,"attentionReasons":["Current published delivery confidence is Amber","In-year forecast variance is +78.8%"]},{"id":"DFE_0017_2021-Q3","year":2026,"name":"Skills Bootcamps","department":"DWP","category":"Government Transformation and Service Delivery","description":"Skills Bootcamps are free training courses for adults typically lasting up to 16 weeks, available across a range of sectors. They help people develop priority skills that are in demand at both local and national level. They are developed by training providers in partnership with employers. Skills Bootcamps have previously been delivered through two routes: national contracts managed in the Skills Bootcamps team in DfE, and grant funding to local areas which then procure and manage their own Skills Bootcamps to meet local skills needs. However, the Secretary of State for Education confirmed on 31 July 2024 that we do not expect to undertake any further national procurement at this time. The current national contracts will end live delivery by 31/07/2025 and conclude by 31/01/2026. The National delivery of the programme will end on the 31/03/2026. In addition, in line with Government priorities and as set out in the English Devolution Framework White Paper on 16/12/24, the Work Based Skills Directorate will be working to devolve delivery to local areas, beginning with two Mayoral Combined Authorities in 2025-26 and expanding more widely in 2026-27. Devolved local areas will receive un-ringfenced funding to deliver skills provision in their areas that will best meet their local needs. This move away from centrally managed national contracts and towards devolved delivery will involve much less active management and monitoring of delivery quality and outcomes and therefore a much smaller team, and Skills Bootcamps is expected to close as a government major programme, having successfully completed the Gate 5 review in June 2025, and all six recommendations being met and signed-off by the DWP Delivery and Performance Board by 16/04/2026. Off boarding is likely to be completed by 31/05/2026.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at AMBER. There remain workload pressures, but the resource position is currently stable. We are currently working to resolve staff allocated to the national contract programme as we transition into BAU. The risk of overspend the Skills Bootcamps programme budget in FY2025-26, is due to stronger-than-expected performance in local areas, resulting in the budget being allocated more quickly than expected. DWP has agreed to cover a significant proportion of the financial shortfall. Costs for the on-going legal challenge and legal claim are still on-going and are yet to be finalised. This will also transfer to DWP. Mitigations have been undertaken and senior colleagues have been in discussions with DWP, who have agreed to cover a substantial proportion of the financial shortfall. Grant activity and other related functions will continue as part of BAU operations as this work transitions to DWP.","startDate":"2020-04-01","endDate":null,"scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same as 31/05/2026. National delivery of the programme will end on the 31/03/2026. We expect that the programme will exit the GMPP on the 31/05/2026, as Mayoral Strategic Authorities (MSAs) increasingly assume responsibility for adult skills delivery from FY26-27.","fyBaseline":123.11,"fyForecast":199.54,"fyVariance":62.08,"varianceNarrative":"The in-year variance exceeds 5%. This is primarily due to the following factors: The Skills Bootcamps programme is demand-led and thus is challenging to forecast accurately due to the large uncertainty. Over the course of the 25-26FY we found spend increased partly due to a greater number of learners beginning on the construction skills package national contracts than we initially forecast, alongside a stronger level of programme performance on grants delivery.","wholeLifeCost":790.39,"costNarrative":"The programmes whole life costs are £790.39m (when applying an inflator). The winding down of national delivery means that spend in more recent years is lower than in previous years due to spend now only being on grants delivery.","benefits":null,"benefitsNarrative":"We intend to develop a more robust baseline once the London School of Economics (LSE) Impact Evaluation of Waves 2 and 3 has been completed which will compare the outcomes of individuals who receive the intervention to a statistically matched comparison group and/or other econometric methods. The Impact Evaluation is scheduled to be available internally towards the end of 2026. It is too early in delivery to provide a forecast for FY25/26 as courses can run up to 31 March 2026, and providers then have a six-month window following the completion of the training to claim a positive outcome. The Impact Evaluation will compare the outcomes of individuals who receive the intervention to a statistically matched comparison group and/or other econometric methods. We envisage that that this will give us an improved baseline in the future.","themes":["Cost & funding","Delivery & schedule","Workforce & capability","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at AMBER. There remain workload pressures, but the resource position is currently stable. We are currently working to resolve staff allocated to the national contract programme as we transition into BAU. The risk of overspend the Skills Bootcamps…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"DFE_0017_2021-Q3","year":2021,"name":"National Skills Fund","department":"DFE","category":"Government Transformation and Service Delivery","description":"The National Skills Fund (NSF) will fund projects that will help people retrain and upskill into better, more productive jobs through developing higher and intermediate skills, and aligned with Further Education","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber.This is primarily due to the following factors: The National Skills Fund programme remains broadly on schedule, with delivery of L3 Adult Offer and Uplift funding meeting the agreed milestone date. The Bootcamps procurement and launch of wave 2 remains mostly on schedule, with staggered starts introduced to accommodate further work on the procurement of Lot 1. The National Skills Fund also remains on schedule, although the recent merger with the Funding and Accountability consultation does present some challenges to delivering in line with agreed milestone.","startDate":"2020-04-01","endDate":"2024-03-31","scheduleNarrative":"The project end-date is 31 March 2024. This is primarily due to the following factors: The programme end date reflects the financial commitment to fund the National Skills Fund until the end of this parliament. By this point the programme will have delivered on various interventions to fill the gaps in adult skills in key sectors and assist learners in achieving better jobs, including the Level 3 Adult Offer and Bootcamps. The timeline is driven by the need to deliver these interventions in a way that allows initial delivery to inform future design, accommodate the consultation on adult skills and align with the wider adult skills reform work.","fyBaseline":8.0,"fyForecast":8.0,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":1148.78,"costNarrative":"The projects Baseline Whole Life Cost is �1148.78m. This is primarily due to the following factors: Whole Life Budgeted Costs reflect the preliminary costs currently within scope","benefits":null,"benefitsNarrative":"","themes":["Delivery & schedule","Cost & funding","Workforce & capability","Commercial & supply chain"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber.This is primarily due to the following factors: The National Skills Fund programme remains broadly on schedule, with delivery of L3 Adult Offer and Uplift funding meeting the agreed milestone date. The Bootcamps procurement and launch of wave 2 remains mostly on schedule,…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21"},{"id":"DFE_0017_2021-Q3","year":2022,"name":"Skills Bootcamps and Free Courses for Jobs","department":"DFE","category":"Government Transformation and Service Delivery","description":"The National Skills Fund (NSF) will fund projects that will help people retrain and upskill into better, more productive jobs through developing higher and intermediate skills, and aligned with Further Education.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 remained at Amber The National Skills Fund remains broadly on schedule following the spending review funding has been confirmed for both Free Courses for Jobs and Skills Bootcamps with exact spending to be agreed following submission of relevant business cases. Free Courses for Jobs extension to Independent Training Providers has been approved and on schedule to deliver at the beginning of 22/23 academic year. Skills Bootcamps Wave 3 procurement is on schedule with work on the dynamic purchasing system for future Skills Bootcamps delivery in progress. Delivery remains challenging due to resourcing but recent approvals for recruitment should see this barrier reduce over Q1/Q2 of the next reporting year. With the design for both interventions now baselined, the programme is looking at transitioning to business as usual and realisation of benefits.","startDate":"2020-04-01","endDate":"2024-03-31","scheduleNarrative":"Compared to 2021-Q4, your project end-date remained scheduled to finish on 31 MAR 2024 . This is primarily due to the following factors: The programme end date reflects the financial commitment to fund the National Skills Fund until the end of this parliament. By this point the programme will have delivered on various interventions to fill the gaps in adult skills in key sectors and assist learners in achieving better jobs, including the Free Courses for Jobs and Skills Bootcamps. The timeline is driven by the need to deliver these interventions in a way that allows initial delivery to inform future design, accommodate the consultation on adult skills and align with the wider adult skills reform work.","fyBaseline":138.0,"fyForecast":110.2,"fyVariance":-20.0,"varianceNarrative":"The budget variance exceeds 5%. Variance between forecast and baseline due to underspends on Free Courses for Jobs and Skills Bootcamps. Underspend caused by limits on provider/learner capacity to expand Free Courses for Jobs offer any more quickly and delays in Skills Bootcamps starts meaning, for some, part of the costs for completion and outcome milestones falling into the next year.","wholeLifeCost":1149.0,"costNarrative":"Compared to 2021-Q4,the projects Baseline Whole Life Cost remained at 1148.78 (£m). This is primarily due to the following factors: Whole Life Budgeted Costs reflect the preliminary costs currently within scope","benefits":null,"benefitsNarrative":"","themes":["Workforce & capability","Delivery & schedule","Cost & funding","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 remained at Amber The National Skills Fund remains broadly on schedule following the spending review funding has been confirmed for both Free Courses for Jobs and Skills Bootcamps with exact spending to be agreed following submission…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"DFE_0017_2021-Q3","year":2023,"name":"Skills Bootcamps and Free Courses for Jobs","department":"DFE","category":"Government Transformation and Service Delivery","description":"The National Skills Fund (NSF) helps people retrain and upskill into better, more productive jobs through developing higher and intermediate skills, and aligned with Further Education. The project is comprised of two offers, Skills Bootcamps and Free Courses for Jobs.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. The National Skills Fund programme remains broadly on schedule, with delivery of Free Courses for Jobs meeting agreed milestones and exceeding delivery trajectories. Skills Bootcamps dynamic purchasing system has delivered to agreed milestones although risks remain around the expansion of starts numbers in 2023/24 and whether this will be fully achieved by planned procurement.","startDate":"2020-04-01","endDate":"2024-03-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2024-03-31. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2024-03-31. This is primarily due to the following factors. The project end-date is 31 March 2024. This is primarily due to the following factors: The programme end date reflects the financial commitment to fund the National Skills Fund until the end of this parliament. By this point the programme will have delivered on various interventions to fill the gaps in adult skills in key sectors and assist learners in achieving better jobs, including the Free Courses for Jobs Offer and Skill Bootcamps. The timeline is driven by the need to deliver these interventions in a way that allows initial delivery to inform future design, accommodate the consultation on adult skills and align with the wider adult skills reform work.","fyBaseline":150.0,"fyForecast":107.2,"fyVariance":-29.0,"varianceNarrative":"The budget variance exceeds 5%. The delivery profile for the programme moved later in the financial year moving some delivery and associated expenditure into 2023/24.","wholeLifeCost":696.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 decreased from 1149m. to 696m. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 decreased from 1149m. to 696m. This is primarily due to the following factors. The whole life cost reported last year being based on initial estimates which have now been revised in the latest business case.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. The project did not provide departmental-agree monetised benefits at 22/23-Q4. Not applicable, no monetised benefits realised by this programme","themes":["Cost & funding","Delivery & schedule","Workforce & capability","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. The National Skills Fund programme remains broadly on schedule, with delivery of Free Courses for Jobs meeting agreed milestones and exceeding delivery trajectories.…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"DFE_0017_2021-Q3","year":2024,"name":"Skills Bootcamps","department":"DFE","category":"Government Transformation and Service Delivery","description":"Skills Bootcamps are free training courses for adults typically lasting up to 16 weeks, available across a range of sectors. They help people develop priority skills that are in demand at both local and national level. They are developed by training providers in partnership with employers. Significant investment has been committed by the government to scale up Skills Bootcamps from 2022 to 2025.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. The Infrastructure Project Authority has not yet communicated a Delivery Confidence Assessment to the project. (We expect to schedule an IPA Gateway review in summer 2024.) The SRO's DCA is Amber. The Skills Bootcamps programme remains broadly on schedule, with learner starts continuing to exceed targets, though volatility in the supplier market creates risk. Work is underway both to improve the programme's underlying data architecture to support delivery at greater scale, and to work with suppliers to drive up quality of provision.","startDate":"2020-04-01","endDate":"2026-05-29","scheduleNarrative":"The project's end-date at 23/24-Q4 is 2026-05-29. This is primarily due to the following factors. Compared to 2223-Q4, the scheduled project end-date has changed from 31 MAR 2024 to 29 MAY 2026. This is primarily due to: gaining approval and funding for a further round of Skills Bootcamps delivery commencing 1 FEB 2024 and expected to conclude 28 FEB 2026; work to improve the programme's underlying data architecture underway and scheduled to conclude 30 APR 2025. The data architecture work is expected to deliver a more stable, longer-term delivery solution for Skills Bootcamps that will enable the programme to offboard from the GMPP, subject to further approval.","fyBaseline":200.0,"fyForecast":154.7,"fyVariance":-23.0,"varianceNarrative":"The budget variance exceeds 5%. The budget variance exceeds 5%. The delivery profile for the programme in FY 2023-24 was based on initial estimates that have now been revised in our latest forecasts.","wholeLifeCost":640.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 23/24-Q4 is 640m. This is primarily due to the following factors. 00 (m) to 640.25 (m). This is primarily due to the following factors: 1) the whole-life cost reported last year was based on initial estimates that have now been revised in our latest forecasts and revised in the latest business case.","benefits":0.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 0m. The programme's departmental-agreed monetised benefits at FY23/24 is 0m.","themes":["Delivery & schedule","Cost & funding","Approvals & decisions","Technical & integration"],"evidenceExcerpt":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. The Infrastructure Project Authority has not yet communicated a Delivery Confidence Assessment to the project. (We expect to schedule an IPA Gateway review in summer 2024.) The SRO's DCA is Amber. The Skills Bootcamps…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"DFE_0017_2021-Q3","year":2025,"name":"SKILLS BOOTCAMPS","department":"DfE","category":"Government Transformation and Service Delivery","description":"Skills Bootcamps is a project to deliver free courses for adults typically lasting up to 16 weeks, available across a range of sectors. Developed by training providers working in partnership with employers, Skills Bootcamps help people develop priority skills that are in demand at both local and national level.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The project has not yet been re-assessed through a NISTA Gateway Review, though one is planned for June 2025.","startDate":"2020-04-01","endDate":"2026-05-29","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 29/05/2026. This is primarily due to the following factors‚ We expect that the programme will exit the GMPP as Mayoral Strategic Authorities increasingly assume responsibility for adult skills delivery from FY26-27.","fyBaseline":233.9,"fyForecast":227.2,"fyVariance":2.86,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":785.55,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 640 to 785. This is primarily due to the following factors‚ Following the 2024 Autumn Budget and Spending Review, the programme received additional funding to enable a further year of delivery in FY25/26, in local areas and Established Mayoral Strategic Authorities receiving integrated settlements.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ This is unchanged from last year – no monetised benefits have been calculated for this project.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The project has not yet been re-assessed through a NISTA Gateway Review, though one is planned for June 2025. Compared to financial year 23/24-Q4, the project's…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"DFE_0017_2021-Q3","year":2026,"name":"Skills Bootcamps","department":"DWP","category":"Government Transformation and Service Delivery","description":"Skills Bootcamps are free training courses for adults typically lasting up to 16 weeks, available across a range of sectors. They help people develop priority skills that are in demand at both local and national level. They are developed by training providers in partnership with employers. Skills Bootcamps have previously been delivered through two routes: national contracts managed in the Skills Bootcamps team in DfE, and grant funding to local areas which then procure and manage their own Skills Bootcamps to meet local skills needs. However, the Secretary of State for Education confirmed on 31 July 2024 that we do not expect to undertake any further national procurement at this time. The current national contracts will end live delivery by 31/07/2025 and conclude by 31/01/2026. The National delivery of the programme will end on the 31/03/2026. In addition, in line with Government priorities and as set out in the English Devolution Framework White Paper on 16/12/24, the Work Based Skills Directorate will be working to devolve delivery to local areas, beginning with two Mayoral Combined Authorities in 2025-26 and expanding more widely in 2026-27. Devolved local areas will receive un-ringfenced funding to deliver skills provision in their areas that will best meet their local needs. This move away from centrally managed national contracts and towards devolved delivery will involve much less active management and monitoring of delivery quality and outcomes and therefore a much smaller team, and Skills Bootcamps is expected to close as a government major programme, having successfully completed the Gate 5 review in June 2025, and all six recommendations being met and signed-off by the DWP Delivery and Performance Board by 16/04/2026. Off boarding is likely to be completed by 31/05/2026.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at AMBER. There remain workload pressures, but the resource position is currently stable. We are currently working to resolve staff allocated to the national contract programme as we transition into BAU. The risk of overspend the Skills Bootcamps programme budget in FY2025-26, is due to stronger-than-expected performance in local areas, resulting in the budget being allocated more quickly than expected. DWP has agreed to cover a significant proportion of the financial shortfall. Costs for the on-going legal challenge and legal claim are still on-going and are yet to be finalised. This will also transfer to DWP. Mitigations have been undertaken and senior colleagues have been in discussions with DWP, who have agreed to cover a substantial proportion of the financial shortfall. Grant activity and other related functions will continue as part of BAU operations as this work transitions to DWP.","startDate":"2020-04-01","endDate":null,"scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same as 31/05/2026. National delivery of the programme will end on the 31/03/2026. We expect that the programme will exit the GMPP on the 31/05/2026, as Mayoral Strategic Authorities (MSAs) increasingly assume responsibility for adult skills delivery from FY26-27.","fyBaseline":123.11,"fyForecast":199.54,"fyVariance":62.08,"varianceNarrative":"The in-year variance exceeds 5%. This is primarily due to the following factors: The Skills Bootcamps programme is demand-led and thus is challenging to forecast accurately due to the large uncertainty. Over the course of the 25-26FY we found spend increased partly due to a greater number of learners beginning on the construction skills package national contracts than we initially forecast, alongside a stronger level of programme performance on grants delivery.","wholeLifeCost":790.39,"costNarrative":"The programmes whole life costs are £790.39m (when applying an inflator). The winding down of national delivery means that spend in more recent years is lower than in previous years due to spend now only being on grants delivery.","benefits":null,"benefitsNarrative":"We intend to develop a more robust baseline once the London School of Economics (LSE) Impact Evaluation of Waves 2 and 3 has been completed which will compare the outcomes of individuals who receive the intervention to a statistically matched comparison group and/or other econometric methods. The Impact Evaluation is scheduled to be available internally towards the end of 2026. It is too early in delivery to provide a forecast for FY25/26 as courses can run up to 31 March 2026, and providers then have a six-month window following the completion of the training to claim a positive outcome. The Impact Evaluation will compare the outcomes of individuals who receive the intervention to a statistically matched comparison group and/or other econometric methods. We envisage that that this will give us an improved baseline in the future.","themes":["Cost & funding","Delivery & schedule","Workforce & capability","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at AMBER. There remain workload pressures, but the resource position is currently stable. We are currently working to resolve staff allocated to the national contract programme as we transition into BAU. The risk of overspend the Skills Bootcamps…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"DFE_0017_2021-Q3","year":2025,"name":"SKILLS BOOTCAMPS","department":"DfE","category":"Government Transformation and Service Delivery","description":"Skills Bootcamps is a project to deliver free courses for adults typically lasting up to 16 weeks, available across a range of sectors. Developed by training providers working in partnership with employers, Skills Bootcamps help people develop priority skills that are in demand at both local and national level.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The project has not yet been re-assessed through a NISTA Gateway Review, though one is planned for June 2025.","startDate":"2020-04-01","endDate":"2026-05-29","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 29/05/2026. This is primarily due to the following factors‚ We expect that the programme will exit the GMPP as Mayoral Strategic Authorities increasingly assume responsibility for adult skills delivery from FY26-27.","fyBaseline":233.9,"fyForecast":227.2,"fyVariance":2.86,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":785.55,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 640 to 785. This is primarily due to the following factors‚ Following the 2024 Autumn Budget and Spending Review, the programme received additional funding to enable a further year of delivery in FY25/26, in local areas and Established Mayoral Strategic Authorities receiving integrated settlements.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ This is unchanged from last year – no monetised benefits have been calculated for this project.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The project has not yet been re-assessed through a NISTA Gateway Review, though one is planned for June 2025. Compared to financial year 23/24-Q4, the project's…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":null,"attentionScore":33,"attentionReasons":["Current published delivery confidence is Amber","In-year forecast variance is +62.1%"]},{"id":"FCO_0216_2223-Q4","year":2026,"name":"TOKYO NEW BUILD, REMODELLING AND REFURBISHMENT","department":"FCDO","category":"Infrastructure and Construction","description":"Refurbishment and remodelling of key buildings on the British Embassy Tokyo compound. The project will address end of life and failing assets through repair and replacement, it will prevent further deterioration and increasing danger of structural damage to the historic buildings and it will provide fit for purpose facilities. The existing buildings fail to fully meet health and safety requirements and are not suitable for a modern and sustainable 21st century office working environment. This significant investment will future proof our ability to deliver diplomatic and operational solutions in one of our most important global posts.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at AMBER.","startDate":"2022-06-01","endDate":null,"scheduleNarrative":"Compared to financial year 24/25 Q4, the projects end date at 25/26 Q4 remains at 1/12/2031. This is primarily due to the following factors: the successful awarding of the Phase 1 contract in January 26 to a leading Tier 1 Japanese contractor, the strategic decision to prioritise Phase 2 ahead of Phase 3 - ensuring resources are directed towards the most critical elements of the project - and the valuable insights gained from Phase 1, which are being leveraged to improve delivery of the subsequent phases. These elements collectively contribute to maintaining the established timeline and reinforcing the project's overall stability.","fyBaseline":3.13,"fyForecast":1.58,"fyVariance":49.57,"varianceNarrative":"The budget variance exceeds 5%. This is due to: the contractors requesting an extension of the tender period so that they could familiarise themselves with UK specific requirements (both contract terms and building standards); and the approval of the Full Business Case taking longer than had been allowed for in the project programme. This led to a delay in contract award and hence a reduction in spend in 2025/26. The contract was awarded in January 2026.","wholeLifeCost":111.25,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) increased from 101 to 120. This is primarily due to the following factors: inclusion of additional scope to deliver additional benefits, as well as further refinement in the design. The revised baseline was agreed by both FCDO and HMT in late 2026, ensuring alignment with updated project requirements and financial parameters.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors: the project is still in the early stages of development - we would expect to be able to calculate monetised benefits at the end of the RIBA Stage 4 design (Autumn 2026). Assuming proper maintenance admin savings are expected through reduced spend on utilities and maintenance.","themes":["Cost & funding","Commercial & supply chain","Approvals & decisions","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at AMBER. Compared to financial year 24/25 Q4, the projects end date at 25/26 Q4 remains at 1/12/2031. This is primarily due to the following factors: the successful awarding of the Phase 1 contract in January 26 to a leading Tier 1 Japanese…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"FCO_0216_2223-Q4","year":2024,"name":"Tokyo Compound","department":"FCDO","category":"Infrastructure and Construction","description":"The Tokyo project will refurbish and upgrade key buildings on the British Embassy compound. It is of strategic and political importance to the UK's foreign policy objectives that these buildings function in the most efficient and cost-effective manner. The buildings currently fail to fully meet health and safety requirements and the need for essential repairs has become urgent. Part of the work will prevent further deterioration and the increasing danger of structural damage to the historic building fabric of both the Residence and Chancery buildings. This significant investment will deliver a fit for purpose and sustainable 21st century working environment and future proof our ability to deliver diplomatic and operational solutions in one of our most important global posts.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. The project has recently achieved a key milestone - the delivery of the RIBA 3 Design Report (Royal Institute of British Architects plan of work identifies Stage 3 as Developed Design). FCDO has procured a Peer Review - this work has commenced and will review the design proposals to ensure that they meet the brief and offer value for money and that the tender documentation is ready to go out to the construction market. FCDO has undertaken market engagement exercises and has interest in the project. We are currently reviewing the resources and team structure to ensure that we are well prepared for the next phase of the project.","startDate":"2022-06-01","endDate":"2031-12-01","scheduleNarrative":"The project's end-date at 23/24-Q4 is 2031-12-01. This is primarily due to the following factors. The schedule allows for the tender of a design and build contract(s), development of detailed design and the delivery of the construction work over several phases to ensure that that the Embassy can continue to function.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"The GMPP project did not provide data","wholeLifeCost":100.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 23/24-Q4 is 100m. This is primarily due to the following factors. The project has secured OBC approval for 100m to cover the works to refurbish and upgrade the key buildings on the British Embassy Tokyo compound. These buildings fail to fully meet health and safety requirements and are not fit for purpose for a modern and sustainable 21st century office working environment. This significant investment will future proof our ability to deliver diplomatic and operational solutions in one of our most important global posts.","benefits":0.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 0m.","themes":["Commercial & supply chain","Delivery & schedule","Scope & requirements","Cost & funding"],"evidenceExcerpt":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. The project has recently achieved a key milestone - the delivery of the RIBA 3 Design Report (Royal Institute of British Architects plan of work identifies Stage 3 as Developed Design). FCDO has procured a Peer Review -…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"FCO_0216_2223-Q4","year":2025,"name":"TOKYO NEW BUILD, REMODELLING AND REFURBISHMENT","department":"FCDO","category":"Infrastructure and Construction","description":"Refurbishment and remodelling of key buildings on the British Embassy Tokyo compound. The project will address end of life and failing assets through repair and replacement, it will prevent further deterioration and increasing danger of structural damage to the historic buildings and it will provide fit for purpose facilities. The existing buildings fail to fully meet health and safety requirements and are not suitable for a modern and sustainable 21st century office working environment. This significant investment will future proof our ability to deliver diplomatic and operational solutions in one of our most important global posts.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. The project agrees with the Delivery Confidence Assessment rating at AMBER.","startDate":"2022-06-01","endDate":"2031-12-01","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 01/12/2031. This is primarily due to the following factors‚ The project is being delivered in phases and our current programme indicates that the end-date for the last phase remains 01/12/2031.","fyBaseline":4.0,"fyForecast":4.0,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%. The budget variance is less than or equal to 5%.","wholeLifeCost":101.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 100 to 101. This is primarily due to the following factors‚ The project's whole life costs are recorded as £101m as agreed in the two OBCs for the project.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ The baseline benefits will be determined during the next phase of design development when further detail is available to calculate the benefits.","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. The project agrees with the Delivery Confidence Assessment rating at AMBER. Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 01/12/2031. This is primarily due to the following…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"FCO_0216_2223-Q4","year":2026,"name":"TOKYO NEW BUILD, REMODELLING AND REFURBISHMENT","department":"FCDO","category":"Infrastructure and Construction","description":"Refurbishment and remodelling of key buildings on the British Embassy Tokyo compound. The project will address end of life and failing assets through repair and replacement, it will prevent further deterioration and increasing danger of structural damage to the historic buildings and it will provide fit for purpose facilities. The existing buildings fail to fully meet health and safety requirements and are not suitable for a modern and sustainable 21st century office working environment. This significant investment will future proof our ability to deliver diplomatic and operational solutions in one of our most important global posts.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at AMBER.","startDate":"2022-06-01","endDate":null,"scheduleNarrative":"Compared to financial year 24/25 Q4, the projects end date at 25/26 Q4 remains at 1/12/2031. This is primarily due to the following factors: the successful awarding of the Phase 1 contract in January 26 to a leading Tier 1 Japanese contractor, the strategic decision to prioritise Phase 2 ahead of Phase 3 - ensuring resources are directed towards the most critical elements of the project - and the valuable insights gained from Phase 1, which are being leveraged to improve delivery of the subsequent phases. These elements collectively contribute to maintaining the established timeline and reinforcing the project's overall stability.","fyBaseline":3.13,"fyForecast":1.58,"fyVariance":49.57,"varianceNarrative":"The budget variance exceeds 5%. This is due to: the contractors requesting an extension of the tender period so that they could familiarise themselves with UK specific requirements (both contract terms and building standards); and the approval of the Full Business Case taking longer than had been allowed for in the project programme. This led to a delay in contract award and hence a reduction in spend in 2025/26. The contract was awarded in January 2026.","wholeLifeCost":111.25,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) increased from 101 to 120. This is primarily due to the following factors: inclusion of additional scope to deliver additional benefits, as well as further refinement in the design. The revised baseline was agreed by both FCDO and HMT in late 2026, ensuring alignment with updated project requirements and financial parameters.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors: the project is still in the early stages of development - we would expect to be able to calculate monetised benefits at the end of the RIBA Stage 4 design (Autumn 2026). Assuming proper maintenance admin savings are expected through reduced spend on utilities and maintenance.","themes":["Cost & funding","Commercial & supply chain","Approvals & decisions","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at AMBER. Compared to financial year 24/25 Q4, the projects end date at 25/26 Q4 remains at 1/12/2031. This is primarily due to the following factors: the successful awarding of the Phase 1 contract in January 26 to a leading Tier 1 Japanese…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"FCO_0216_2223-Q4","year":2025,"name":"TOKYO NEW BUILD, REMODELLING AND REFURBISHMENT","department":"FCDO","category":"Infrastructure and Construction","description":"Refurbishment and remodelling of key buildings on the British Embassy Tokyo compound. The project will address end of life and failing assets through repair and replacement, it will prevent further deterioration and increasing danger of structural damage to the historic buildings and it will provide fit for purpose facilities. The existing buildings fail to fully meet health and safety requirements and are not suitable for a modern and sustainable 21st century office working environment. This significant investment will future proof our ability to deliver diplomatic and operational solutions in one of our most important global posts.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. The project agrees with the Delivery Confidence Assessment rating at AMBER.","startDate":"2022-06-01","endDate":"2031-12-01","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 01/12/2031. This is primarily due to the following factors‚ The project is being delivered in phases and our current programme indicates that the end-date for the last phase remains 01/12/2031.","fyBaseline":4.0,"fyForecast":4.0,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%. The budget variance is less than or equal to 5%.","wholeLifeCost":101.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 100 to 101. This is primarily due to the following factors‚ The project's whole life costs are recorded as £101m as agreed in the two OBCs for the project.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ The baseline benefits will be determined during the next phase of design development when further detail is available to calculate the benefits.","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. The project agrees with the Delivery Confidence Assessment rating at AMBER. Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 01/12/2031. This is primarily due to the following…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":null,"attentionScore":33,"attentionReasons":["Current published delivery confidence is Amber","In-year forecast variance is +49.6%"]},{"id":"MOD_0076_1213-Q1","year":2026,"name":"ASTUTE BOATS 1-7","department":"MOD","category":"Military Capability","description":"To deliver the seven Boat Astute Class within approved performance, cost and time parameters, while actively contributing to the sustainment of the UK submarine design and manufacturing capability.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25-Q4, the NISTA/SRO Delivery Confidence Assessment rating at 25/26-Q4 remained at Amber. This is primarily due to the following factors. 1. The Astute build programme has achieved the majority of its build and commissioning milestones in this financial year. However, the Delivery Confidence Assessment remains Amber because of potential delays in the in-water phase for Boat 6, and the build of Boat 7 based on current productivity rates.","startDate":"1997-03-17","endDate":null,"scheduleNarrative":"Exempt under Section 26 - Defence","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":14428.06,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) increased from £11,570.00 to £11,590.00. This is primarily due to a revised cost estimate for completion of the programme and inflation.","benefits":null,"benefitsNarrative":"Compared to financial year 2024/25-Q4, the project's departmental-agreed monetised benefits at 2025/26-Q4 remained at £0m.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25-Q4, the NISTA/SRO Delivery Confidence Assessment rating at 25/26-Q4 remained at Amber. This is primarily due to the following factors. 1. The Astute build programme has achieved the majority of its build and commissioning milestones in this financial year. However, the Delivery Confidence Assessment remains Amber because of…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"MOD_0076_1213-Q1","year":2020,"name":"Astute Boats 1-7","department":"MOD","category":"Military Capability","description":"The design, development and manufacture of Astute class submarines.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber/Red, which has declined since last year�s Q2 1819 Amber, due primarily to the following factors; - A delay to Boat 4 which was caused by emergent technical issues which required unplanned repair and rework before proceeding with the normal commissioning process. - Elements of work on Boat 5 were paused in order to deploy extra resource to resolving the issues on Boat 4, impacting on the delivery. Through additional recruitment and provision of training to upskill the current workforce, we will significantly improve the situation in the medium term. Since the Q2 1920 (30th September 2019) Amber/Red IPA DCA, the following primary project actions have impacted the original Q2 IPA DCA; - The MOD has worked with its Tier 1 industrial partners to deliver Boat 4 to the Royal Navy and to recover the Boat 5 schedule, as well as improve production quality. Normal boat commissioning operations are now progressing.","startDate":null,"endDate":null,"scheduleNarrative":"Exempt under Section 24 of Freedom of Information Act 2000 (National Security)","fyBaseline":467.43,"fyForecast":424.11,"fyVariance":-9.0,"varianceNarrative":"The 19/20 in-year baseline / forecast variance at Q2 1920 (30th September 2019) of -9%, is due primarily to the following factors; - Greater clarity of expenditure across the Boat Build Programme. Since the Q2 1920 (30th September 2019) 19/20 in-year baseline / forecast variance of -9%, the following primary project actions have impacted the original Q2 19/20 in-year variance; - Boat 4 has been successfully delivered from Barrow. - Through continued close engagement and collaboration with industry further schedule improvement has been made.","wholeLifeCost":10769.42,"costNarrative":"The baseline Whole Life Cost at Q2 1920 (30th September 2019) is �10,769.42 m, has increased by �798.65 m since last year's Q2 1819 (�m) baseline Whole Life Cost of �9,970.77 m, due primarily to the following factors; - The department re-baselined the ASTUTE programme for the long term, with its associated whole life costs, as our understanding of the overall schedule and costs matured. Approval changes across the whole programme including boats, schedules, rates, and performance expectation. None of which are not attributable to a discrete boat or cause","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Workforce & capability","Approvals & decisions"],"evidenceExcerpt":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber/Red, which has declined since last year�s Q2 1819 Amber, due primarily to the following factors; - A delay to Boat 4 which was caused by emergent technical issues which required unplanned repair and rework before proceeding with the normal commissioning process. -…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2020","sourceLabel":"IPA Annual Report 2019-20"},{"id":"MOD_0076_1213-Q1","year":2021,"name":"Astute Boats 1-7","department":"MOD","category":"Military Capability","description":"To deliver the seven Boat Astute Class within approved performance, cost and time parameters, while actively contributing to the sustainment of the UK submarine design and manufacturing capability.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber/red. This is primarily due to the following factors: The Astute programme had previously reported schedule delays to Boat 4 and Boat 5, given emergent technical issues on Boat 4, which having been resolved allowed Boat 4 to sail from Barrow in April 2020. Having seen programme delivery confidence grow in the first quarter of 2020, COVID-19 added risk to the Astute programme, however through commitment to the use of Personal Protective Equipment, working ways and personnel safety, any impacts to the remaining schedules are thought to be minimal. Reprioritisation of tasks in the early stages of the pandemic, plus changing shift patterns and a rigorous testing regime, safeguarded the individual projects. The most recent Infrastructure and Projects Authority review has concluded that delivery confidence has improved overall.","startDate":"1997-03-17","endDate":null,"scheduleNarrative":"Exempt under Section 24 of the Freedom of Information Act 2000 (National security)","fyBaseline":434.91,"fyForecast":451.47,"fyVariance":4.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":10830.05,"costNarrative":"Compared to financial year 19/20-Q2, the projects Baseline Whole Life Cost increased from �10769.42m to �10830.05m. This is primarily due to the following factors: The last Reported Whole Life Cost through the Defence Major Programmes Portfolio at Q2 2019/20 was �10,769.423m. There have been increases mainly driven by inclusion of Covid-19 schedule�impact assessments across the remaining Boats offset by declaration�of cost reductions through BAE Systems Project 2021 efficiency programme.�","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Technical & integration","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber/red. This is primarily due to the following factors: The Astute programme had previously reported schedule delays to Boat 4 and Boat 5, given emergent technical issues on Boat 4, which having been resolved allowed Boat 4 to…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21"},{"id":"MOD_0076_1213-Q1","year":2022,"name":"Astute Boats 1-7","department":"MOD","category":"Military Capability","description":"To deliver the seven Boat Astute Class within approved performance, cost and time parameters, while actively contributing to the sustainment of the UK submarine design and manufacturing capability.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating increased from Amber/Red to Amber. This is primarily due to the following factors: The removal of the incremental Amber/Red and Amber/Green rating. Despite continued COVID-19 challenges, the Astute build programme has achieved its major build and commissioning milestones though this financial year, and therefore delivery confidence of Amber is maintained. HMS AUDACIOUS commissioned, HMS ANSON is afloat, HMS AGEMEMNON and HMS AGINCOURT are being fitted out. However, the programme still carries schedule risk because of workload demands and access to the limited number of Suitably Qualified and Experienced Personnel that is not limited to Defence but also Industry and the wider Nuclear Sector.","startDate":"1997-03-17","endDate":null,"scheduleNarrative":"Exempt under Section 24 of the Freedom of Information Act 2000 (National security)","fyBaseline":371.56,"fyForecast":386.07,"fyVariance":4.0,"varianceNarrative":"The budget variance is inferior or equal to 5%","wholeLifeCost":10833.0,"costNarrative":"Compared to 2021-Q4 the project's Baseline Whole Life Cost increased from 10830.05 (£m) to 10832.67 (£m) . This is primarily due to the following factors: Impacts on the submarine build schedules including those caused by Covid-19.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating increased from Amber/Red to Amber. This is primarily due to the following factors: The removal of the incremental Amber/Red and Amber/Green rating. Despite continued COVID-19 challenges, the Astute build programme has achieved its major build…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"MOD_0076_1213-Q1","year":2023,"name":"Astute Boats 1-7","department":"MOD","category":"Military Capability","description":"To deliver the seven Boat Astute Class within approved performance, cost and time parameters, while actively contributing to the sustainment of the UK submarine design and manufacturing capability.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber (SRO rating). This is primarily due to the following factors. The Astute build programme has achieved its major build and commissioning milestones through this financial year, however, the programme still carries significant schedule risk for the remaining boats because of workload demands and the limited number of Suitably Qualified and Experienced Personnel available.","startDate":"1997-03-17","endDate":null,"scheduleNarrative":"Exempt under Section 24 of the Freedom of Information Act 2000 (National security)","fyBaseline":304.89,"fyForecast":384.48,"fyVariance":26.0,"varianceNarrative":"The budget variance exceeds 5%. . This is primarily due to the following factors: Inflationary impact realised from increased supplier pay settlements and rates. The committment to new contracts with the prime supplier, including the contracts to install essential safety and capability change packages to the remaining boats.","wholeLifeCost":10827.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 decreased from 10833m. to 10827m. This is primarily due to the following factors. The programme remains on track to complete within budget.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This programme does not report cashable benefits. Its aim is to provision the armed forces with the equipment and / or infrastructure required.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber (SRO rating). This is primarily due to the following factors. The Astute build programme has achieved its major build and commissioning milestones through this financial year, however, the programme still carries significant schedule risk for the…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"MOD_0076_1213-Q1","year":2024,"name":"Astute Boats 1-7","department":"MOD","category":"Military Capability","description":"To deliver the seven Boat Astute Class within approved performance, cost and time parameters, while actively contributing to the sustainment of the UK submarine design and manufacturing capability.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure and Projects Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The Astute build programme has achieved the majority of its build and commissioning milestones in this financial year. However, the programme remains Amber because of potential delays based on current productivity rates, and the possibility of delay during the in-water phase for Boat 6.","startDate":"1997-03-17","endDate":null,"scheduleNarrative":"The programme remains committed to building seven Astute Class submarines. Boats one to five have been delivered to the Royal Navy while the remaining two vessels are at an advanced stage of build at the BAES Shipyard.","fyBaseline":389.52,"fyForecast":411.52,"fyVariance":5.648,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. Increased supplier pay settlement and rates.","wholeLifeCost":11256.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 increased from 10827m. to 11256m. This is primarily due to the following factors. A revised cost estimate for completion of the programme, factoring in inflation and delivery cadence within the Shipyard.","benefits":0.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 0m.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure and Projects Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The Astute build programme has achieved the majority of its build and commissioning milestones in this financial year. However, the programme remains Amber…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"MOD_0076_1213-Q1","year":2025,"name":"ASTUTE BOATS 1-7","department":"MoD","category":"Military Capability","description":"To deliver the seven Boat Astute Class within approved performance, cost and time parameters, while actively contributing to the sustainment of the UK submarine design and manufacturing capability.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Project's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER, compared with the Infrastructure and Projects Authority's assessment last year of AMBER. This is due to the following factors. The Astute build programme has achieved the majority of its build and commissioning milestones in this financial year. However, the programme remains Amber because of potential delays based on current productivity rates, and the possibility of delay during the in-water phase for Boat 6.","startDate":"1997-03-17","endDate":null,"scheduleNarrative":"Section 24 - National security","fyBaseline":353.05,"fyForecast":329.7,"fyVariance":6.61,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. Increased supplier pay settlement and rates.","wholeLifeCost":11571.12,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 11256 to 11571. This is primarily due to the following factors. A revised cost estimate for completion of the programme, factoring in inflation and delivery cadence within the Shipyard.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain"],"evidenceExcerpt":"The Project's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER, compared with the Infrastructure and Projects Authority's assessment last year of AMBER. This is due to the following factors. The Astute build programme has achieved the majority of its build and commissioning milestones in this financial year. However, the programme remains Amber…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"MOD_0076_1213-Q1","year":2026,"name":"ASTUTE BOATS 1-7","department":"MOD","category":"Military Capability","description":"To deliver the seven Boat Astute Class within approved performance, cost and time parameters, while actively contributing to the sustainment of the UK submarine design and manufacturing capability.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25-Q4, the NISTA/SRO Delivery Confidence Assessment rating at 25/26-Q4 remained at Amber. This is primarily due to the following factors. 1. The Astute build programme has achieved the majority of its build and commissioning milestones in this financial year. However, the Delivery Confidence Assessment remains Amber because of potential delays in the in-water phase for Boat 6, and the build of Boat 7 based on current productivity rates.","startDate":"1997-03-17","endDate":null,"scheduleNarrative":"Exempt under Section 26 - Defence","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":14428.06,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) increased from £11,570.00 to £11,590.00. This is primarily due to a revised cost estimate for completion of the programme and inflation.","benefits":null,"benefitsNarrative":"Compared to financial year 2024/25-Q4, the project's departmental-agreed monetised benefits at 2025/26-Q4 remained at £0m.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25-Q4, the NISTA/SRO Delivery Confidence Assessment rating at 25/26-Q4 remained at Amber. This is primarily due to the following factors. 1. The Astute build programme has achieved the majority of its build and commissioning milestones in this financial year. However, the Delivery Confidence Assessment remains Amber because of…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"MOD_0076_1213-Q1","year":2025,"name":"ASTUTE BOATS 1-7","department":"MoD","category":"Military Capability","description":"To deliver the seven Boat Astute Class within approved performance, cost and time parameters, while actively contributing to the sustainment of the UK submarine design and manufacturing capability.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Project's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER, compared with the Infrastructure and Projects Authority's assessment last year of AMBER. This is due to the following factors. The Astute build programme has achieved the majority of its build and commissioning milestones in this financial year. However, the programme remains Amber because of potential delays based on current productivity rates, and the possibility of delay during the in-water phase for Boat 6.","startDate":"1997-03-17","endDate":null,"scheduleNarrative":"Section 24 - National security","fyBaseline":353.05,"fyForecast":329.7,"fyVariance":6.61,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. Increased supplier pay settlement and rates.","wholeLifeCost":11571.12,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 11256 to 11571. This is primarily due to the following factors. A revised cost estimate for completion of the programme, factoring in inflation and delivery cadence within the Shipyard.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain"],"evidenceExcerpt":"The Project's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER, compared with the Infrastructure and Projects Authority's assessment last year of AMBER. This is due to the following factors. The Astute build programme has achieved the majority of its build and commissioning milestones in this financial year. However, the programme remains Amber…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":null,"attentionScore":32,"attentionReasons":["Current published delivery confidence is Amber","In-year forecast variance is +43.0%"]},{"id":"CO_0176_2223-Q3","year":2026,"name":"Falcon Programme","department":"CO","category":"Government Transformation and Service Delivery","description":"The Falcon programme is an important initiative to update the Cabinet Office's main IT systems. We are moving our staff from Google Workspace to Microsoft 365 (M365). The initial approach was for the Cabinet Office to build its own new IT system for this change. However, after review, we found this was not the most cost-effective option. We have now approved a new plan. This involves moving our digital services to a shared government service called Integrated Corporate Services (ICS), which is managed by the Department for Energy Security and Net Zero (DESNZ). While this new approach means the project will take a bit longer to complete, it will save money in the long run by using an existing government service. Why is this change important? The Cabinet Office is the central headquarters for the government. Currently, we use Google Workspace, which is different from the Microsoft systems used by most of our partners both inside and outside of government. This difference can make working together and sharing information difficult. Moving to Microsoft 365 will help us work more effectively and efficiently. It's becoming more and more important for us to collaborate easily with people from other organisations, who might be in different places, using different devices, and working at different times. This change will also allow us to use new Artificial Intelligence (AI) tools that are being developed across government. What will the Falcon programme deliver? The programme has two main goals: A new IT system for the Cabinet Office: This will include a new Microsoft 365 setup, built and managed by Integrated Corporate Services. Moving our staff and their data: We will carefully move our employees and their information from Google Workspace to Microsoft 365. This will bring us in line with the rest of government and open up better ways to work together.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 improved to AMBER. This is primarily due to the following factors: - Refined Cyber Assurance and incident response mechanisms - Finalised the data migration strategy - Obtained approval for resourcing and budgets - Delivered platform go live, and pre-pilot user testing. The following area's are area's of focus to move the programme from Amber to Green: - Defining the future operating model & support processes - Improving the programme's and its partners current responsiveness to change","startDate":"2022-05-01","endDate":"2026-12-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 has increased from Dec 2026 to Dec 2027. This is primarily due to the following factors: The platform testing in the prepilot, along with subsequent lessons learned, involved replanning. This replanning now includes additional time for the migration to the ICS Shared Services operating model and Data migration. Migrations are by Business Unit, in tranches selected by size and complexity through to December 2027 - Close","fyBaseline":8.43,"fyForecast":4.94,"fyVariance":41.38,"varianceNarrative":"The budget variance exceeds 5%. The budget for the year is lower than anticipated budget. This is primarily due to investing resource time in delivery mobilisation planning during the financial year and a revision of the rollout plan. A successful pre pilot has commenced in the financial year leading to a revised pilot date early in FY26/27 which will enable migration at pace during FY 26/27. The whole lifecycle cost of the programme remains unchanged.","wholeLifeCost":23.11,"costNarrative":"Compared to financial year 24/25 Q4, the programme's departmentally agreed whole life cycle cost at 25/26 Q4 increased. This is primarily due to a revised business case submission for Microsoft Licencing and Copilot commitment. The programme scope now includes the inclusion of Copilot and resulted in certainty over the M365 E5 cost uplifts, This resulted in a marginal increase on the baseline cost.","benefits":88.1,"benefitsNarrative":"Q4 decreased. This is primarily due to a change in Cabinet Office user numbers reducing benefits and a revision to the migration rollout plan meaning benefits associated with previous financial years were not realised. A revised programme business case submission in the summer will rebaseline the benefit position over a 5 year period.","themes":["Cost & funding","Technical & integration","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 improved to AMBER. This is primarily due to the following factors: - Refined Cyber Assurance and incident response mechanisms - Finalised the data migration strategy - Obtained approval for resourcing and budgets - Delivered platform go live, and…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"CO_0176_2223-Q3","year":2023,"name":"Falcon IT Platform Refresh and Migration","department":"CO","category":"Government Transformation and Service Delivery","description":"Falcon is a business change programme that will fundamentally underpin the digital transformation of the Cabinet Office.The Transformation will be achieved through two key areas of investment. First we will update the OFFICIAL IT platforms within the Cabinet Office, which will contribute to reducing cyber-security risk, address legacy systems and automate underlying infrastructure. The second work stream the Cabinet Office we will invest in, will enable the implementation of the Central Digital Data Office (CDDO) interoperability policy standards and guidance through the migration of the department to Microsoft Office M365. This will enable better interoperability across government as we move both our people and data from Google Workspace to Microsoft 365. The Cabinet Office is at the heart of Government and a common productivity suite will enable more efficient and effective ways of working.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 is Amber. This is primarily due to the following factors. The DCA of Amber reflects the position of the Falcon Programme in February 2023. The programme has continued to build capacity and capability to ensure it moves forward, it has successfully on-boarded partners and commenced the Discovery phase. Delivery is closely managed by the a Programme Board attended by our Partners to ensure a balance in pace of delivery and quality and ensuring Value for Money. The Programme supports further independent assurance reviews and this are planned alongside the production of a Full Business Case that will be submitted for approval by the Cabinet Office and by HM Treasury for funding to build the new platform and migrate users and their data to Microsoft M365.","startDate":"2022-05-01","endDate":"2025-03-31","scheduleNarrative":"The project's end-date at 22/23-Q4 is 2025-03-31. This is primarily due to the following factors. The programme will complete discovery activity in autumn 2023. This will deliver a plan with a high level of confidence for the build of the new platform and the migration to M365. The schedule has a target date of 31st March 2025 with a contingency of one year that will be informed by discovery. The schedule will be monitored by the programme board to ensure value for for money and will will accelerate activity where appropriate.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"The programme was challenged to move at pace but was unable to complete the complex procurement activity in the financial year due to extensions in timelines, which were at the request of the market. One of the preferred commercial frameworks was closed (G-CLOUD12), forcing the programme to move to G-CLOUD13 and restart that procurement. These factors were the key drivers behind the budget variance which also impacted the programmes ability to onboard staff resource. Commercial contracts for the 2 supporting partners were signed in Q4 23/24.","wholeLifeCost":52.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 22/23-Q4 is 52m. This is primarily due to the following factors. The Falcon programme has an approved outline business case with forecast costs. The programmes approvals allow it to move into discovery where the phase report will confirm second stage costs. With this data a full business case with final costs will be submitted. The whole life costs will be confirmed at this point.","benefits":60.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 60m. The programme will deliver cashable and non- cashable benefits delivering improved collaboration and efficiency in line with the CDDO interoperability policy from the migration of the Department from Google to MS365. The OFFICAL platform refresh will deliver enhanced cybersecurity benefits including mitigating the potential costs of addressing a serious cyber security attack.","themes":["Delivery & schedule","Cost & funding","Commercial & supply chain","Approvals & decisions"],"evidenceExcerpt":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 is Amber. This is primarily due to the following factors. The DCA of Amber reflects the position of the Falcon Programme in February 2023. The programme has continued to build capacity and capability to ensure it moves forward, it has successfully on-boarded partners and…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"CO_0176_2223-Q3","year":2024,"name":"Falcon IT Platform Refresh and Migration","department":"CO","category":"Government Transformation and Service Delivery","description":"Falcon is a business change programme that will fundamentally underpin the digital transformation of the Cabinet Office.The Transformation will be achieved through two key areas of investment. First we will update the OFFICIAL IT platforms within the Cabinet Office, which will contribute to reducing cyber-security risk, address legacy systems and automate underlying infrastructure. The second work stream the Cabinet Office we will invest in, will enable the implementation of the Central Digital Data Office (CDDO) interoperability policy standards and guidance through the migration of the department to Microsoft Office M365. This will enable better interoperability across government as we move both our people and data from Google Workspace to Microsoft 365. The Cabinet Office is at the heart of Government and a common productivity suite will enable more efficient and effective ways of working.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 22/23-Q4, Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 increased from Amber to Red. This is primarily due to the following factors. The programme is currently rated at Red as it does not have an agreed strategic direction, investment and funding available. If there continues to be misalignment between the strategic intent and funding availability then the programme will almost certainly fail to deliver the scope and benefits set out in the business case. _x000D_ _x000D_ The programme's route to Green is through the submission of a Programme Business Case (PBC) with defined options for the migration and technical delivery.","startDate":"2022-05-01","endDate":"2026-03-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 increased from 2025-03-31 to 2026-03-31. This is primarily due to the following factors. The original profiling was delayed by 12 months due to procurement delays. The original profile was a 3 year spend profile from Apr 23 to March 26. The anticipated spend profile expects an end date of April 27, 12 months after the original baseline end date.","fyBaseline":21.75,"fyForecast":10.05,"fyVariance":-54.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The original profiling 21.8 m was delayed by 12 months due to procurement delays. This has had the impact of moving the original spend profile out by 12 months. The 23/24 financial year was intended to be a more expensive migration and roll out period in the original baseline plan, however due to procurement delays the discovery period and proof of concept have been completed in 23/24 and design phase has commenced. The overall costs are therefore significantly lower (11.7 m) reducing the profile to 10 m in 23/24 against the baseline plan as migration and roll out has not yet commenced.","wholeLifeCost":51.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 decreased from 52m. to 51m. This is primarily due to the following factors. The Whole Life Cost 51.4 m remains within the GMPP approval. There is a slight reduction in WLC 50.6 m due to in year savings in 23/24 against budget profile. The profiling over future years will be reviewed as part of the May Programme Business Case Submission. Profiles have used business planning options for the remaining years whilst the business case preparation is ongoing.","benefits":60.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 60m. Benefits were re-baselined in March 2023. The benefits value remains consistent with the baseline. Benefits review is ongoing as part of the May Programme Business Case Submission.","themes":["Cost & funding","Approvals & decisions","Technical & integration","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 increased from Amber to Red. This is primarily due to the following factors. The programme is currently rated at Red as it does not have an agreed strategic direction, investment and funding available. If there continues to be misalignment…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"CO_0176_2223-Q3","year":2025,"name":"Falcon Programme","department":"CO","category":"Government Transformation and Service Delivery","description":"The Falcon programme is an important initiative to update the Cabinet Office's main IT systems. We are moving our staff from Google Workspace to Microsoft 365 (M365). The initial approach was for the Cabinet Office to build its own new IT system for this change. However, after review, we found this was not the most cost-effective option. We have now approved a new plan. This involves moving our digital services to a shared government service called Integrated Corporate Services (ICS), which is managed by the Department for Energy Security and Net Zero (DESNZ). While this new approach means the project will take a bit longer to complete, it will save money in the long run by using an existing government service. Why is this change important? The Cabinet Office is the central headquarters for the government. Currently, we use Google Workspace, which is different from the Microsoft systems used by most of our partners both inside and outside of government. This difference can make working together and sharing information difficult. Moving to Microsoft 365 will help us work more effectively and efficiently. It's becoming more and more important for us to collaborate easily with people from other organisations, who might be in different places, using different devices, and working at different times. This change will also allow us to use new Artificial Intelligence (AI) tools that are being developed across government. What will the Falcon programme deliver? The programme has two main goals: A new IT system for the Cabinet Office: This will include a new Microsoft 365 setup, built and managed by Integrated Corporate Services. Moving our staff and their data: We will carefully move our employees and their information from Google Workspace to Microsoft 365. This will bring us in line with the rest of government and open up better ways to work together.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at RED. This is primarily due to the following factors‚ The Infrastructure Project Authority's Delivery Confidence Assessment rating for 24/25-Q4 remains at RED. This is primarily due to concerns that the Programme does not have the resources to transition the Cabinet Office Business Units (BUs) to the new services within the planned time frame. The delay in the Pilot, now projected for completion by September 2025, has contributed to this assessment. An IPA Gateway took place where the Review Team expressed concerns about the pace of BU migrations and the rising costs associated with the Programme. The issues are being addressed as part of an action plan with NISTA support.","startDate":"2022-05-01","endDate":null,"scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2026. This is primarily due to the following factors‚ The programmes end date is now forecast to be complete by 31 December 2026. The initial approach was for the Cabinet Office to build its own new IT system for this change. However, after review, we found this was not the most cost-effective option. We have now approved a new plan with an extended delivery window. This involves moving our digital services to a shared government service called Integrated Corporate Services (ICS), which is managed by the Department for Energy Security and Net Zero (DESNZ).","fyBaseline":7.2,"fyForecast":6.78,"fyVariance":5.83,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ This is due to reduced spend against the baseline due to resourcing delays.","wholeLifeCost":23.7,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 51 to 23. This is primarily due to the following factors‚ This is due to a revised business case submission which changed from building our own platform, to outsourcing to another government department and securing migration resource from Microsoft and partners at no investment cost.","benefits":88.2,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 60 to 88. This is primarily due to the following factors‚ As part of the business case submission we revised the benefit profiling in line with CDDO economist recommendations.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Technical & integration"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at RED. This is primarily due to the following factors‚ The Infrastructure Project Authority's Delivery Confidence Assessment rating for 24/25-Q4 remains at RED. This is primarily due to concerns that the Programme does not…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"CO_0176_2223-Q3","year":2026,"name":"Falcon Programme","department":"CO","category":"Government Transformation and Service Delivery","description":"The Falcon programme is an important initiative to update the Cabinet Office's main IT systems. We are moving our staff from Google Workspace to Microsoft 365 (M365). The initial approach was for the Cabinet Office to build its own new IT system for this change. However, after review, we found this was not the most cost-effective option. We have now approved a new plan. This involves moving our digital services to a shared government service called Integrated Corporate Services (ICS), which is managed by the Department for Energy Security and Net Zero (DESNZ). While this new approach means the project will take a bit longer to complete, it will save money in the long run by using an existing government service. Why is this change important? The Cabinet Office is the central headquarters for the government. Currently, we use Google Workspace, which is different from the Microsoft systems used by most of our partners both inside and outside of government. This difference can make working together and sharing information difficult. Moving to Microsoft 365 will help us work more effectively and efficiently. It's becoming more and more important for us to collaborate easily with people from other organisations, who might be in different places, using different devices, and working at different times. This change will also allow us to use new Artificial Intelligence (AI) tools that are being developed across government. What will the Falcon programme deliver? The programme has two main goals: A new IT system for the Cabinet Office: This will include a new Microsoft 365 setup, built and managed by Integrated Corporate Services. Moving our staff and their data: We will carefully move our employees and their information from Google Workspace to Microsoft 365. This will bring us in line with the rest of government and open up better ways to work together.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 improved to AMBER. This is primarily due to the following factors: - Refined Cyber Assurance and incident response mechanisms - Finalised the data migration strategy - Obtained approval for resourcing and budgets - Delivered platform go live, and pre-pilot user testing. The following area's are area's of focus to move the programme from Amber to Green: - Defining the future operating model & support processes - Improving the programme's and its partners current responsiveness to change","startDate":"2022-05-01","endDate":"2026-12-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 has increased from Dec 2026 to Dec 2027. This is primarily due to the following factors: The platform testing in the prepilot, along with subsequent lessons learned, involved replanning. This replanning now includes additional time for the migration to the ICS Shared Services operating model and Data migration. Migrations are by Business Unit, in tranches selected by size and complexity through to December 2027 - Close","fyBaseline":8.43,"fyForecast":4.94,"fyVariance":41.38,"varianceNarrative":"The budget variance exceeds 5%. The budget for the year is lower than anticipated budget. This is primarily due to investing resource time in delivery mobilisation planning during the financial year and a revision of the rollout plan. A successful pre pilot has commenced in the financial year leading to a revised pilot date early in FY26/27 which will enable migration at pace during FY 26/27. The whole lifecycle cost of the programme remains unchanged.","wholeLifeCost":23.11,"costNarrative":"Compared to financial year 24/25 Q4, the programme's departmentally agreed whole life cycle cost at 25/26 Q4 increased. This is primarily due to a revised business case submission for Microsoft Licencing and Copilot commitment. The programme scope now includes the inclusion of Copilot and resulted in certainty over the M365 E5 cost uplifts, This resulted in a marginal increase on the baseline cost.","benefits":88.1,"benefitsNarrative":"Q4 decreased. This is primarily due to a change in Cabinet Office user numbers reducing benefits and a revision to the migration rollout plan meaning benefits associated with previous financial years were not realised. A revised programme business case submission in the summer will rebaseline the benefit position over a 5 year period.","themes":["Cost & funding","Technical & integration","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 improved to AMBER. This is primarily due to the following factors: - Refined Cyber Assurance and incident response mechanisms - Finalised the data migration strategy - Obtained approval for resourcing and budgets - Delivered platform go live, and…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"CO_0176_2223-Q3","year":2025,"name":"Falcon Programme","department":"CO","category":"Government Transformation and Service Delivery","description":"The Falcon programme is an important initiative to update the Cabinet Office's main IT systems. We are moving our staff from Google Workspace to Microsoft 365 (M365). The initial approach was for the Cabinet Office to build its own new IT system for this change. However, after review, we found this was not the most cost-effective option. We have now approved a new plan. This involves moving our digital services to a shared government service called Integrated Corporate Services (ICS), which is managed by the Department for Energy Security and Net Zero (DESNZ). While this new approach means the project will take a bit longer to complete, it will save money in the long run by using an existing government service. Why is this change important? The Cabinet Office is the central headquarters for the government. Currently, we use Google Workspace, which is different from the Microsoft systems used by most of our partners both inside and outside of government. This difference can make working together and sharing information difficult. Moving to Microsoft 365 will help us work more effectively and efficiently. It's becoming more and more important for us to collaborate easily with people from other organisations, who might be in different places, using different devices, and working at different times. This change will also allow us to use new Artificial Intelligence (AI) tools that are being developed across government. What will the Falcon programme deliver? The programme has two main goals: A new IT system for the Cabinet Office: This will include a new Microsoft 365 setup, built and managed by Integrated Corporate Services. Moving our staff and their data: We will carefully move our employees and their information from Google Workspace to Microsoft 365. This will bring us in line with the rest of government and open up better ways to work together.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at RED. This is primarily due to the following factors‚ The Infrastructure Project Authority's Delivery Confidence Assessment rating for 24/25-Q4 remains at RED. This is primarily due to concerns that the Programme does not have the resources to transition the Cabinet Office Business Units (BUs) to the new services within the planned time frame. The delay in the Pilot, now projected for completion by September 2025, has contributed to this assessment. An IPA Gateway took place where the Review Team expressed concerns about the pace of BU migrations and the rising costs associated with the Programme. The issues are being addressed as part of an action plan with NISTA support.","startDate":"2022-05-01","endDate":null,"scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2026. This is primarily due to the following factors‚ The programmes end date is now forecast to be complete by 31 December 2026. The initial approach was for the Cabinet Office to build its own new IT system for this change. However, after review, we found this was not the most cost-effective option. We have now approved a new plan with an extended delivery window. This involves moving our digital services to a shared government service called Integrated Corporate Services (ICS), which is managed by the Department for Energy Security and Net Zero (DESNZ).","fyBaseline":7.2,"fyForecast":6.78,"fyVariance":5.83,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ This is due to reduced spend against the baseline due to resourcing delays.","wholeLifeCost":23.7,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 51 to 23. This is primarily due to the following factors‚ This is due to a revised business case submission which changed from building our own platform, to outsourcing to another government department and securing migration resource from Microsoft and partners at no investment cost.","benefits":88.2,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 60 to 88. This is primarily due to the following factors‚ As part of the business case submission we revised the benefit profiling in line with CDDO economist recommendations.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Technical & integration"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at RED. This is primarily due to the following factors‚ The Infrastructure Project Authority's Delivery Confidence Assessment rating for 24/25-Q4 remains at RED. This is primarily due to concerns that the Programme does not…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":-1,"transition":"Improved","endDateDeltaDays":null,"attentionScore":32,"attentionReasons":["Current published delivery confidence is Amber","In-year forecast variance is +41.4%"]},{"id":"HO_0330_2324-Q4","year":2026,"name":"Immigration Removal Centre (IRC) Expansion Programme","department":"HO","category":"Infrastructure and Construction","description":"Immigration Enforcement's Detention Strategy & Programmes (DS&P) have been tasked to deliver an additional 1,000 male occupancy strategic / long-term detention bed spaces (increasing the total immigration removal centre (IRC) estate bed capacity from approximately 2,400 to 3,500). Delivery will be central to supporting the Government’s Plan for Change priorities “Strong Foundations: Secure Borders”, “Safer Streets”, and the Statement on “Restoring Order & Control”, by facilitating the Government’s / HO’s ambitions to increase the removal rates of those here unlawfully over time and strengthen public safety. It will also help address the need to manage the IRC Estate and maintain capacity while wider detention facilities are, where required, being refurbished or improved. The Immigration Removal Centre Expansion Programme is the DS&P vehicle to deliver these 1,000 bed spaces - through the redevelopment, and expansion of two previously decommissioned IRCs Campsfield, and Haslar.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Delivery Confidence: Amber. Campsfield IRC Phase 1 - successfully accepted its first detained individual on 03/12/2025, with Optimal Occupancy achieved on 20/03/26, providing 160 beds in total. Haslar IRC Phase 1 - remains on track to complete construction in late 2026, with first detained individuals being accepted in 2027. Phase 2 - Main contractor contract award has been executed 21/04/2026 (for technical design initially), with RIBA 3 & 4 design activity commencing in 05/2026. Outline Crown Development application for Campsfield Phase 2 was submitted 13/03/26, alongside the Statement of National Importance. The Haslar Crown Development Application Notification of Intent and Ministerial ITN is on track for submission in 05/2026. IRCEP Programme - Following a NISTA Gateway 0 review in February 2025, IRCEP achieved an Amber rating. Since then 100% of NISTA's Gateway 0 recommendations have been formally discharged.","startDate":null,"endDate":"2031-03-14","scheduleNarrative":"Exempt under Section 43 - Commercial interests","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Exempt under Section 43 - Commercial interests","themes":["Commercial & supply chain","Scope & requirements","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Delivery Confidence: Amber. Campsfield IRC Phase 1 - successfully accepted its first detained individual on 03/12/2025, with Optimal Occupancy achieved on 20/03/26, providing 160 beds in total. Haslar IRC Phase 1 - remains on track to complete construction in late 2026, with first detained individuals being accepted in 2027. Phase 2 - Main contractor…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"HO_0330_2324-Q4","year":2024,"name":"Immigration Removal Centre (IRC) Expansion Programme","department":"HO","category":"Government Transformation and Service Delivery","description":"Immigration Enforcement's Detention Services have been tasked to deliver an additional 1,000 detained bed spaces to support increases in detention to deliver government priorities, including Illegal Migration Act removals, increasing demand on the estate due to pressures from the prison estate, increasing 'Business as Usual' removals as activity returns to pre-pandemic levels, and to manage the estate/maintain capacity while wider estate facilities are refurbished. IRCEP is the DS vehicle to deliver these 1,000 bed spaces - through the renovation, and expansion of two previously decommissioned IRCs - Campsfield, and Haslar.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. The programme delivery timeline has zero contingency. Construction has commenced with main contractor for phase 1 at Haslar and Campsfield. Phase 2 construction technical design has commenced. Haslar construction delay risk due to unresolved Habitat risk assessment mitigation. Commercial procurement underway for service provider contracts. FBC approval is underway, Campsfield phase 1 construction has been approved at InvestCo. 5 further FBCs will follow to be approved.","startDate":"2022-01-24","endDate":"2026-12-31","scheduleNarrative":"The project's end-date at 23/24-Q4 is 2026-12-31. This is primarily due to the following factors. OBC has been approved. _x000D_ Campsfield and Haslar construction commenced. _x000D_ Galliford Try has been appointment as main contractor for phase 1 construction. _x000D_ Service provider contracts commenced at evaluation bidder stage._x000D_ NHSE contract at approval bid stage. _x000D_ Campsfield Phase 1 construction (160 beds) FBC approved at InvestCo. _x000D_ Haslar Phase 1 construction (130 beds) FBC approval underway.","fyBaseline":35.16,"fyForecast":35.16,"fyVariance":0.0,"varianceNarrative":"The budget variance is inferior or equal to 5%.","wholeLifeCost":1051.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 23/24-Q4 is 1051m. This is primarily due to the following factors. The WLC includes the costs to build IRC facilities at two sites; Campsfield and Haslar. Programme costs and operator service costs are also accounted for. 95m of the WLC has been approved by the Home Office Investment Committee, but is pending HM Treasury and Cabinet Office approval. The rest of the WLC is not final and is subject to completion of procurement processes and subsequent investment approvals.","benefits":0.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 0m. IRCEP should be considered within the context of enabling delivery of the wider IMA benefits and IE's long term detention capacity requirements. Benefits and economic advantage are realised at IMA portfolio level to avoid IRCEP benefit double counting. This means that there are no quantifiable / monetisable benefits at programme level. _x000D_ _x000D_ The preferred option (to deliver the full 1,000 beds at Campsfield and Haslar), is considered most likely to achieve VfM, because it delivers both the benefits of supporting requirements under the IMA and a permanent long-term solution for Immigration Enforcement detention and enforcement capabilities. Wider benefits associated with IMA are included within the New Plan for Immigration (NPI) business case suite, because it is not currently possible to monetise these benefits without considering the numerous enablers involved with delivering returns (escorting, Immigration Compliance Enforcement (ICE) etc).","themes":["Approvals & decisions","Commercial & supply chain","Delivery & schedule","Cost & funding"],"evidenceExcerpt":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. The programme delivery timeline has zero contingency. Construction has commenced with main contractor for phase 1 at Haslar and Campsfield. Phase 2 construction technical design has commenced. Haslar construction delay…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"HO_0330_2324-Q4","year":2025,"name":"Immigration Removal Centre (IRC) Expansion Programme","department":"HO","category":"Infrastructure and Construction","description":"Section 43 - Commercial interests","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Section 43 - Commercial interests","startDate":null,"endDate":null,"scheduleNarrative":"Section 43 - Commercial interests","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 43 - Commercial interests","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Section 43 - Commercial interests","themes":["Commercial & supply chain"],"evidenceExcerpt":"Section 43 - Commercial interests Section 43 - Commercial interests","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"HO_0330_2324-Q4","year":2026,"name":"Immigration Removal Centre (IRC) Expansion Programme","department":"HO","category":"Infrastructure and Construction","description":"Immigration Enforcement's Detention Strategy & Programmes (DS&P) have been tasked to deliver an additional 1,000 male occupancy strategic / long-term detention bed spaces (increasing the total immigration removal centre (IRC) estate bed capacity from approximately 2,400 to 3,500). Delivery will be central to supporting the Government’s Plan for Change priorities “Strong Foundations: Secure Borders”, “Safer Streets”, and the Statement on “Restoring Order & Control”, by facilitating the Government’s / HO’s ambitions to increase the removal rates of those here unlawfully over time and strengthen public safety. It will also help address the need to manage the IRC Estate and maintain capacity while wider detention facilities are, where required, being refurbished or improved. The Immigration Removal Centre Expansion Programme is the DS&P vehicle to deliver these 1,000 bed spaces - through the redevelopment, and expansion of two previously decommissioned IRCs Campsfield, and Haslar.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Delivery Confidence: Amber. Campsfield IRC Phase 1 - successfully accepted its first detained individual on 03/12/2025, with Optimal Occupancy achieved on 20/03/26, providing 160 beds in total. Haslar IRC Phase 1 - remains on track to complete construction in late 2026, with first detained individuals being accepted in 2027. Phase 2 - Main contractor contract award has been executed 21/04/2026 (for technical design initially), with RIBA 3 & 4 design activity commencing in 05/2026. Outline Crown Development application for Campsfield Phase 2 was submitted 13/03/26, alongside the Statement of National Importance. The Haslar Crown Development Application Notification of Intent and Ministerial ITN is on track for submission in 05/2026. IRCEP Programme - Following a NISTA Gateway 0 review in February 2025, IRCEP achieved an Amber rating. Since then 100% of NISTA's Gateway 0 recommendations have been formally discharged.","startDate":null,"endDate":"2031-03-14","scheduleNarrative":"Exempt under Section 43 - Commercial interests","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Exempt under Section 43 - Commercial interests","themes":["Commercial & supply chain","Scope & requirements","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Delivery Confidence: Amber. Campsfield IRC Phase 1 - successfully accepted its first detained individual on 03/12/2025, with Optimal Occupancy achieved on 20/03/26, providing 160 beds in total. Haslar IRC Phase 1 - remains on track to complete construction in late 2026, with first detained individuals being accepted in 2027. Phase 2 - Main contractor…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"HO_0330_2324-Q4","year":2025,"name":"Immigration Removal Centre (IRC) Expansion Programme","department":"HO","category":"Infrastructure and Construction","description":"Section 43 - Commercial interests","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Section 43 - Commercial interests","startDate":null,"endDate":null,"scheduleNarrative":"Section 43 - Commercial interests","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 43 - Commercial interests","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Section 43 - Commercial interests","themes":["Commercial & supply chain"],"evidenceExcerpt":"Section 43 - Commercial interests Section 43 - Commercial interests","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":null,"attentionScore":32,"attentionReasons":["Current published delivery confidence is Amber","In-year forecast variance is +43.0%"]},{"id":"MOD_0527_2526-Q1","year":2026,"name":"Mobile Fires Platform","department":"MOD","category":"Military Capability","description":"The Mobile Fires Platform (MFP) Project will deliver the long-term solution for the British Army’s Close Support artillery requirement through the procurement of the Boxer-based Remote Controlled Howitzer 155mm (RCH155). This platform represents a transformative advancement in artillery systems that will enhance the operational effectiveness and mobility of the modern British Armed Forces. MFP will be 52-cal 155mm all weather, day and night capable, automated, self-propelled gun, flexible enough to support an Army that is more precise, more lethal and agile in global operations.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26-Q4 is AMBER. This is due to the following factors. 1. The Mobile Fires Platform (MFP) Project aims to deliver a Minimal Deployable Capability (MDC) to the British Army by the end of the decade. This time frame leads to some MDC delivery risks reflected by the AMBER assessment. 2. Risks have appropriate mitigation plans and senior-level support for escalation and resolution.","startDate":null,"endDate":null,"scheduleNarrative":"The programme's end date at 25/26-Q4 remains undetermined. The MFP programme remains on track to deliver a Minimal Deployable Capability to the British Army by the end of the decade.","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"The project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. Benefits of the MFP Project are principally non-monetised.","themes":["Commercial & supply chain","Delivery & schedule","Workforce & capability","Governance & assurance"],"evidenceExcerpt":"The NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26-Q4 is AMBER. This is due to the following factors. 1. The Mobile Fires Platform (MFP) Project aims to deliver a Minimal Deployable Capability (MDC) to the British Army by the end of the decade. This time frame leads to some MDC delivery risks reflected by the AMBER assessment. 2. Risks have…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"MOD_0527_2526-Q1","year":2026,"name":"Mobile Fires Platform","department":"MOD","category":"Military Capability","description":"The Mobile Fires Platform (MFP) Project will deliver the long-term solution for the British Army’s Close Support artillery requirement through the procurement of the Boxer-based Remote Controlled Howitzer 155mm (RCH155). This platform represents a transformative advancement in artillery systems that will enhance the operational effectiveness and mobility of the modern British Armed Forces. MFP will be 52-cal 155mm all weather, day and night capable, automated, self-propelled gun, flexible enough to support an Army that is more precise, more lethal and agile in global operations.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26-Q4 is AMBER. This is due to the following factors. 1. The Mobile Fires Platform (MFP) Project aims to deliver a Minimal Deployable Capability (MDC) to the British Army by the end of the decade. This time frame leads to some MDC delivery risks reflected by the AMBER assessment. 2. Risks have appropriate mitigation plans and senior-level support for escalation and resolution.","startDate":null,"endDate":null,"scheduleNarrative":"The programme's end date at 25/26-Q4 remains undetermined. The MFP programme remains on track to deliver a Minimal Deployable Capability to the British Army by the end of the decade.","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"The project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. Benefits of the MFP Project are principally non-monetised.","themes":["Commercial & supply chain","Delivery & schedule","Workforce & capability","Governance & assurance"],"evidenceExcerpt":"The NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26-Q4 is AMBER. This is due to the following factors. 1. The Mobile Fires Platform (MFP) Project aims to deliver a Minimal Deployable Capability (MDC) to the British Army by the end of the decade. This time frame leads to some MDC delivery risks reflected by the AMBER assessment. 2. Risks have…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":null,"ratingDelta":null,"transition":"Not comparable","endDateDeltaDays":null,"attentionScore":32,"attentionReasons":["Current published delivery confidence is Amber","In-year forecast variance is +43.0%"]},{"id":"MOJ_0220_2223-Q4","year":2026,"name":"Property Transformation Programme","department":"MOJ","category":"Government Transformation and Service Delivery","description":"The programme aims to transform property services through the procurement of new contracts that align to Government Facilities Management (FM) Strategy, meet statutory minimum and operational requirements and lay the foundation for wider transformation.​","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25-Q4, the NISTA Delivery Confidence Assessment (DCA) at 25/26-Q4 remains at Amber. This is primarily due to uncertainty around affordability and ongoing delivery risks.","startDate":"2022-10-03","endDate":"2028-09-30","scheduleNarrative":"The programme's end date at 25/26-Q4 remains 30/09/28. The project remains on track to deliver in line with the baseline schedule.","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Exempt under Section 43 - Commercial interests","themes":["Commercial & supply chain","Delivery & schedule","Cost & funding"],"evidenceExcerpt":"Compared to financial year 24/25-Q4, the NISTA Delivery Confidence Assessment (DCA) at 25/26-Q4 remains at Amber. This is primarily due to uncertainty around affordability and ongoing delivery risks. The programme's end date at 25/26-Q4 remains 30/09/28. The project remains on track to deliver in line with the baseline schedule.","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"MOJ_0220_2223-Q4","year":2024,"name":"Property Transformation Programme","department":"MOJ","category":"Government Transformation and Service Delivery","description":"The programme aims to transform property services through the procurement of new contracts that align to Government Facilities Management (FM) Strategy, meet statutory minimum and operational requirements and lay the foundation for wider transformation.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. This is the first time data has been published for this programme, which has been added to GMPP over the last year. The Amber Delivery Confidence Assessment is driven by inherent risk in the project's procurement timelines.","startDate":"2022-10-03","endDate":"2026-03-31","scheduleNarrative":"The project's end-date at 23/24-Q4 is 2026-03-31. This is primarily due to the following factors. The programme is on track to deliver against the baseline schedule.","fyBaseline":10.4,"fyForecast":10.4,"fyVariance":0.0,"varianceNarrative":"The budget variance is inferior or equal to 5%.","wholeLifeCost":7358.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 23/24-Q4 is 7358m. This is primarily due to the following factors. The Whole Life Cost has been calculated to include the option for four Service Level Options for future contracts and is subject to future decisions on scope which will have a material impact on cost.","benefits":0.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 0m. This programme currently reports no monetised benefits. The programme's benefits are related to the safe maintenance and operation of the relevant parts of the MoJ Estate.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Scope & requirements"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. This is the first time data has been published for this programme, which has been added to GMPP over the last year. The Amber Delivery Confidence Assessment is driven by inherent risk in the project's procurement…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"MOJ_0220_2223-Q4","year":2025,"name":"Property Transformation Programme","department":"MoJ","category":"Government Transformation and Service Delivery","description":"The programme aims to transform property services through the procurement of new contracts that align to Government Facilities Management (FM) Strategy, meet statutory minimum and operational requirements and lay the foundation for wider transformation.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The Amber Delivery Confidence Assessment is driven by inherent risk in the procurement timelines.","startDate":"2022-10-03","endDate":"2028-09-30","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2026 to 30/09/2028. This is primarily due to the following factors‚ Changes to the implementation date of the Procurement Act 2023 impacted the procurement timelines and the schedule was re-baselined.","fyBaseline":16.22,"fyForecast":11.42,"fyVariance":29.61,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The underspend is due to not needing to draw on Optimism Bias.","wholeLifeCost":6826.6,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 7358 to 6826. This is primarily due to the following factors‚ The decrease reflects the updated Outline Business Case costs following a reduction in requirements.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ This programme currently reports no monetised benefits. The programme's benefits are related to the safe maintenance and operation of the relevant parts of the MoJ Estate.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The Amber Delivery Confidence Assessment is driven by inherent risk in the procurement timelines. Compared to financial year 23/24-Q4, the project's end-date at…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"MOJ_0220_2223-Q4","year":2026,"name":"Property Transformation Programme","department":"MOJ","category":"Government Transformation and Service Delivery","description":"The programme aims to transform property services through the procurement of new contracts that align to Government Facilities Management (FM) Strategy, meet statutory minimum and operational requirements and lay the foundation for wider transformation.​","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25-Q4, the NISTA Delivery Confidence Assessment (DCA) at 25/26-Q4 remains at Amber. This is primarily due to uncertainty around affordability and ongoing delivery risks.","startDate":"2022-10-03","endDate":"2028-09-30","scheduleNarrative":"The programme's end date at 25/26-Q4 remains 30/09/28. The project remains on track to deliver in line with the baseline schedule.","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Exempt under Section 43 - Commercial interests","themes":["Commercial & supply chain","Delivery & schedule","Cost & funding"],"evidenceExcerpt":"Compared to financial year 24/25-Q4, the NISTA Delivery Confidence Assessment (DCA) at 25/26-Q4 remains at Amber. This is primarily due to uncertainty around affordability and ongoing delivery risks. The programme's end date at 25/26-Q4 remains 30/09/28. The project remains on track to deliver in line with the baseline schedule.","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"MOJ_0220_2223-Q4","year":2025,"name":"Property Transformation Programme","department":"MoJ","category":"Government Transformation and Service Delivery","description":"The programme aims to transform property services through the procurement of new contracts that align to Government Facilities Management (FM) Strategy, meet statutory minimum and operational requirements and lay the foundation for wider transformation.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The Amber Delivery Confidence Assessment is driven by inherent risk in the procurement timelines.","startDate":"2022-10-03","endDate":"2028-09-30","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2026 to 30/09/2028. This is primarily due to the following factors‚ Changes to the implementation date of the Procurement Act 2023 impacted the procurement timelines and the schedule was re-baselined.","fyBaseline":16.22,"fyForecast":11.42,"fyVariance":29.61,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The underspend is due to not needing to draw on Optimism Bias.","wholeLifeCost":6826.6,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 7358 to 6826. This is primarily due to the following factors‚ The decrease reflects the updated Outline Business Case costs following a reduction in requirements.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ This programme currently reports no monetised benefits. The programme's benefits are related to the safe maintenance and operation of the relevant parts of the MoJ Estate.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The Amber Delivery Confidence Assessment is driven by inherent risk in the procurement timelines. Compared to financial year 23/24-Q4, the project's end-date at…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":0,"attentionScore":32,"attentionReasons":["Current published delivery confidence is Amber","In-year forecast variance is +43.0%"]},{"id":"MOD_0055_1112-Q1","year":2026,"name":"TYPE 26 GLOBAL COMBAT SHIP PROGRAMME","department":"MOD","category":"Military Capability","description":"Type 26 Global Combat Ship Programme will procure 8 x Anti Submarine Warfare (ASW) ships and associated support. The ships will deliver an interoperable, survivable, available, and adaptable capability that is operable globally within the maritime battlespace, to contribute to sea control for the Joint Force, and to contribute to maritime force projection and Joint Force command and control, with the flexibility to operate across, and within, the range and scale of contingent and non contingent operations. This eight ship programme will deliver Anti Submarine Warfare capability to protect strategic assets, sustain national shipbuilding capability, and increase the resilience of the Naval Service.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors. 1. Delay caused by a combination of outstanding engineering design volume, supply chain performance, and COVID 19 related slowdown resulted in a schedule rebaseline to programme Initial Operating Capability, which was approved in early 2022 by the MOD Investment Approvals Committee and HM Treasury. 2. Importantly, quality has not been compromised, and T26 Frigates will be world class ships.","startDate":"2008-07-21","endDate":"2037-01-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme end-date at 25/26-Q4 remained the same at 01/05/2035.","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Commercial & supply chain","Delivery & schedule","Cost & funding","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors. 1. Delay caused by a combination of outstanding engineering design volume, supply chain performance, and COVID 19 related slowdown resulted in a schedule rebaseline to programme Initial…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"MOD_0055_1112-Q1","year":2020,"name":"Type 26 Global Combat Ship Programme","department":"MOD","category":"Military Capability","description":"Procure 8 x Anti Submarine Warfare (ASW) ships and associated support.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber, which has declined since last year�s Q2 1819 Amber/Green, due primarily to the following factors; - The consumption of float in the schedule has required a review of the performance management baseline. At Q2 this review had not completed. In project management, float is the amount of time that a task in a project schedule can be delayed without causing a delay to subsequent tasks or project completion date. - Consumption of float expected to impact forecast dates but remain within contractual and approved dates. In project management, float is the amount of time that a task in a project schedule can be delayed without causing a delay to subsequent tasks or project completion date. Since the Q2 1920 (30th September 2019) Amber IPA DCA, the following primary project actions have impacted the original Q2 IPA DCA; - The rebaselining is complete and an Operational Plan was issued in January 2020 - Processes to release design engineering products have been addressed to reduce risk of further contingency consumption","startDate":"2008-07-21","endDate":"2035-05-01","scheduleNarrative":"The scheduled baseline project end date at Q2 1920 (30th September 2019) is 01/05/35, has not changed since last year's Q2 1819 date of 01/05/35, due primarily to the following factors; - Project closure is forecast for 2035, it is too early to predict any change to the baseline - The project closure date was a broad estimate at time of Main Gate 2. A revised, risk adjusted estimate is expected to be available at the next full approval point once we seek to move to contract for batch 2. Main Gate was the MOD major investment decision point prior to contractual commitment with industry. Under the internal MOD MAID review in 2019, the process has been modified to align to wider government practice and future major investment decisions points will be known as Full Business Case (FBC) decisions.","fyBaseline":502.38,"fyForecast":502.28,"fyVariance":0.0,"varianceNarrative":"Budget variance less than 5%","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests)","benefits":null,"benefitsNarrative":"","themes":["Delivery & schedule","Approvals & decisions","Governance & assurance","Commercial & supply chain"],"evidenceExcerpt":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber, which has declined since last year�s Q2 1819 Amber/Green, due primarily to the following factors; - The consumption of float in the schedule has required a review of the performance management baseline. At Q2 this review had not completed. In project management,…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2020","sourceLabel":"IPA Annual Report 2019-20"},{"id":"MOD_0055_1112-Q1","year":2021,"name":"Type 26 Global Combat Ship Programme","department":"MOD","category":"Military Capability","description":"The Type 26 Global Combat Ship Programme will�procure eight Anti Submarine Warfare ships and associated support. � This eight ship programme will deliver Anti-Submarine Warfare capability to protect strategic assets, sustain national shipbuilding capability and increase the resilience of the Naval Service.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber. This is primarily due to the following factors: The Amber Delivery Confidence�is�considered appropriate given�the COVID-19 impact on schedule, the performance of the supply chain and�greater than forecast volume of engineering design work. COVID - During the first COVID lockdown production in the Govan yard was paused by 4 weeks to enable�revised safe systems of work to be put in place. Work has recommenced and the production rate has since stabilised. Supply Chain -�Delivery of�key components�have been delayed�due to poor supplier performance in progressing the Factory Acceptance Tests.� Maintaining quality control has been prioritised to ensure the performance of the T26�meets the user requirements and de-risks the downstream programme. Engineering Design -�The volume of design work to complete prior to commencing production in some areas of the ship has impacted schedule.� The�design work is forecasted to reduce�to a steady state level by the end of the calendar year 2021.","startDate":"2008-07-21","endDate":"2035-05-01","scheduleNarrative":"Compared to financial year 19/20-Q2, the project's end-date remained scheduled to finish on 01 May 2035 . This is primarily due to the following factors: Schedule delay caused by a combination of outstanding engineering design volume, supply chain performance and Covid 19 related slowdown has consumed project float for the first 3 ships. The detailed impact to delivery forecasts are under analysis. Any impact to Vessel Acceptance Dates will be reported once the company and Defence Equipment & Support have completed their review in Summer 2021. Cut steel for ship 4 and project end date remains on track.�","fyBaseline":581.98,"fyForecast":554.5,"fyVariance":-5.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"","themes":["Delivery & schedule","Commercial & supply chain","Scope & requirements","Cost & funding"],"evidenceExcerpt":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber. This is primarily due to the following factors: The Amber Delivery Confidence�is�considered appropriate given�the COVID-19 impact on schedule, the performance of the supply chain and�greater than forecast volume of engineering…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21"},{"id":"MOD_0055_1112-Q1","year":2022,"name":"Type 26 Global Combat Ship Programme","department":"MOD","category":"Military Capability","description":"Type 26 Global Combat Ship Programme will procure 8 x Anti Submarine Warfare ships and associated support. To deliver an interoperable, survivable, available and adaptable capability that is operable globally within the maritime battle space to contribute to sea control for the Joint Force and contribute to maritime force projection and Joint Force command and control with the flexibility to operate across and within the range and scale of Contingent and non-Contingent operations. This 8 ship programme will deliver Anti-Submarine Warfare capability to protect strategic assets, sustain national shipbuilding capability and increase resilience of the Naval Service.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber. This is primarily due to the following factors: Schedule delay, caused by a combination of outstanding engineering design volume, supply chain performance and COVID related slowdown has caused delay to the programme Initial Operating Capability which is currently being considered for approval by the MOD Investment Approvals Committee and HM Treasury. Importantly, quality has not been compromised and Type 26 Frigates will be world class ships delivered in time to replace their Type 23 counterparts. The Delivery Confidence Assessment report from the Support Gateway Review completed in Jul 21 rated the programme as Amber.","startDate":"2008-07-21","endDate":"2035-05-01","scheduleNarrative":"Compared to 2021-Q4 the project end-date remained scheduled to finish on 1 May 35. This is primarily due to the following factors: Despite delay caused by engineering design issues, supply chain performance and the impact of COVID19 and subsequent safe systems of work the schedule has been held.","fyBaseline":639.0,"fyForecast":634.0,"fyVariance":0.0,"varianceNarrative":"The budget variance is inferior or equal to 5%.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests)","benefits":null,"benefitsNarrative":"","themes":["Delivery & schedule","Commercial & supply chain","Cost & funding","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber. This is primarily due to the following factors: Schedule delay, caused by a combination of outstanding engineering design volume, supply chain performance and COVID related slowdown has caused delay to the programme Initial…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"MOD_0055_1112-Q1","year":2023,"name":"Type 26 Global Combat Ship Programme","department":"MOD","category":"Military Capability","description":"Type 26 Global Combat Ship Programme will procure 8 x Anti Submarine Warfare ships and associated support. The ships will deliver an interoperable, survivable, available and adaptable capability that is operable globally within the maritime battle space to contribute to sea control for the Joint Force and contribute to maritime force projection and Joint Force command and control with the flexibility to operate across and within the range and scale of Contingent and non-Contingent operations. This 8 ship programme will deliver Anti-Submarine Warfare capability to protect strategic assets, sustain national shipbuilding capability and increase resilience of the Naval Service.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber (SRO rating). This is primarily due to the following factors. Delay caused by a combination of outstanding engineering design volume, supply chain performance and COVID related slowdown has resulted in a re-baseline to Initial Operating Capability, which was approved earlier in the year. Importantly, quality has not been compromised and T26 Frigates will be world class ships delivered in time to replace their T23 counterparts.","startDate":"2008-07-21","endDate":"2035-05-01","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2035-05-01. This is primarily due to the following factors. NA","fyBaseline":816.77,"fyForecast":814.78,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This programme does not report cashable benefits. Its aim is to provision the armed forces with the equipment and / or infrastructure required.","themes":["Commercial & supply chain","Cost & funding","Delivery & schedule","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber (SRO rating). This is primarily due to the following factors. Delay caused by a combination of outstanding engineering design volume, supply chain performance and COVID related slowdown has resulted in a re-baseline to Initial Operating Capability,…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"MOD_0055_1112-Q1","year":2024,"name":"Type 26 Global Combat Ship Programme","department":"MOD","category":"Military Capability","description":"Type 26 Global Combat Ship Programme will procure eight Anti Submarine Warfare (ASW) ships and associated support. The ships will deliver an interoperable, survivable, available and adaptable capability, that is operable globally within the maritime battle space, to contribute to sea control for the Joint Force and contribute to maritime force projection and Joint Force command and control, with the flexibility to operate across and within the range and scale of Contingent and non-Contingent operations. This eight ship programme will deliver Anti-Submarine Warfare capability to protect strategic assets, sustain national shipbuilding capability and increase the resilience of the Naval Service.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. Delay caused by a combination of outstanding engineering design volume; supply chain performance and COVID19 related slowdown resulted in a schedule re-baseline to programme Initial Operating Capability. Importantly, quality has not been compromised and T26 Frigates will be world class ships delivered in time to replace their T23 counterparts.","startDate":"2008-07-21","endDate":"2035-05-01","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained on schedule to finish on 2035-05-01.","fyBaseline":677.21,"fyForecast":693.57,"fyVariance":2.416,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.)","benefits":0.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 0m.","themes":["Delivery & schedule","Commercial & supply chain","Cost & funding","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. Delay caused by a combination of outstanding engineering design volume; supply chain performance and COVID19 related slowdown resulted in a schedule re-baseline to…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"MOD_0055_1112-Q1","year":2025,"name":"TYPE 26 GLOBAL COMBAT SHIP PROGRAMME","department":"MoD","category":"Military Capability","description":"The Type 26 Global Combat Ship Programme will procure 8 x Anti Submarine Warfare (ASW) ships and associated support. The ships will deliver an interoperable, survivable, available and adaptable capability that is operable globally within the maritime battle space, to contribute to sea control for the Joint Force and contribute to maritime force projection and Joint Force command and control, with the flexibility to operate across and within the range and scale of Contingent and non-Contingent operations. This eight ship programme will deliver Anti-Submarine Warfare capability to protect strategic assets, sustain national shipbuilding capability and increase the resilience of the Naval Service.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Project's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER, compared with the Infrastructure and Projects Authority's assessment last year of AMBER. This is due to the following factors. Delay caused by a combination of outstanding engineering design volume, supply chain performance and COVID19 related slowdown resulted in a schedule re-baseline to the programme's Initial Operating Capability, which was approved in early 2022. Importantly, quality has not been compromised and T26 Frigates will be world class ships delivered in time to replace their T23 counterparts.","startDate":"2008-07-21","endDate":null,"scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 01/05/2035. .","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 43 - Commercial interests","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits","themes":["Commercial & supply chain","Delivery & schedule","Scope & requirements","Cost & funding"],"evidenceExcerpt":"The Project's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER, compared with the Infrastructure and Projects Authority's assessment last year of AMBER. This is due to the following factors. Delay caused by a combination of outstanding engineering design volume, supply chain performance and COVID19 related slowdown resulted in a schedule…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"MOD_0055_1112-Q1","year":2026,"name":"TYPE 26 GLOBAL COMBAT SHIP PROGRAMME","department":"MOD","category":"Military Capability","description":"Type 26 Global Combat Ship Programme will procure 8 x Anti Submarine Warfare (ASW) ships and associated support. The ships will deliver an interoperable, survivable, available, and adaptable capability that is operable globally within the maritime battlespace, to contribute to sea control for the Joint Force, and to contribute to maritime force projection and Joint Force command and control, with the flexibility to operate across, and within, the range and scale of contingent and non contingent operations. This eight ship programme will deliver Anti Submarine Warfare capability to protect strategic assets, sustain national shipbuilding capability, and increase the resilience of the Naval Service.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors. 1. Delay caused by a combination of outstanding engineering design volume, supply chain performance, and COVID 19 related slowdown resulted in a schedule rebaseline to programme Initial Operating Capability, which was approved in early 2022 by the MOD Investment Approvals Committee and HM Treasury. 2. Importantly, quality has not been compromised, and T26 Frigates will be world class ships.","startDate":"2008-07-21","endDate":"2037-01-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme end-date at 25/26-Q4 remained the same at 01/05/2035.","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Commercial & supply chain","Delivery & schedule","Cost & funding","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors. 1. Delay caused by a combination of outstanding engineering design volume, supply chain performance, and COVID 19 related slowdown resulted in a schedule rebaseline to programme Initial…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"MOD_0055_1112-Q1","year":2025,"name":"TYPE 26 GLOBAL COMBAT SHIP PROGRAMME","department":"MoD","category":"Military Capability","description":"The Type 26 Global Combat Ship Programme will procure 8 x Anti Submarine Warfare (ASW) ships and associated support. The ships will deliver an interoperable, survivable, available and adaptable capability that is operable globally within the maritime battle space, to contribute to sea control for the Joint Force and contribute to maritime force projection and Joint Force command and control, with the flexibility to operate across and within the range and scale of Contingent and non-Contingent operations. This eight ship programme will deliver Anti-Submarine Warfare capability to protect strategic assets, sustain national shipbuilding capability and increase the resilience of the Naval Service.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Project's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER, compared with the Infrastructure and Projects Authority's assessment last year of AMBER. This is due to the following factors. Delay caused by a combination of outstanding engineering design volume, supply chain performance and COVID19 related slowdown resulted in a schedule re-baseline to the programme's Initial Operating Capability, which was approved in early 2022. Importantly, quality has not been compromised and T26 Frigates will be world class ships delivered in time to replace their T23 counterparts.","startDate":"2008-07-21","endDate":null,"scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 01/05/2035. .","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 43 - Commercial interests","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits","themes":["Commercial & supply chain","Delivery & schedule","Scope & requirements","Cost & funding"],"evidenceExcerpt":"The Project's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER, compared with the Infrastructure and Projects Authority's assessment last year of AMBER. This is due to the following factors. Delay caused by a combination of outstanding engineering design volume, supply chain performance and COVID19 related slowdown resulted in a schedule…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":null,"attentionScore":32,"attentionReasons":["Current published delivery confidence is Amber","In-year forecast variance is +43.0%"]},{"id":"DCMS_0013_1819-Q3","year":2026,"name":"4th National Lottery Licence","department":"DCMS","category":"Government Transformation and Service Delivery","description":"The 4th National Lottery Competition Programme is responsible for ensuring the continuation of the National Lottery on the expiry of the 3rd Licence at the end of January 2024. This involved designing a new licence fit for the future and selecting an operator via a competitive application process who is able to continue to develop the National Lottery as a public asset in order to maximise the returns to good causes whilst also ensuring the highest standards of propriety and player protection.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25-Q4, NISTA's Delivery Confidence Assessment rating at 25/26-Q3 increased from RED to AMBER.This is primarily due to the following factors‚ during 25/26, Allwyn were able to successfully complete both Retail (RCO) and Digital Cutover (DCO) activities bringing the project in line with expected deadlines. Following AELs delivery of DCO in January 2026 the Programme increased from AMBER to GREEN (25/26-Q4).","startDate":"2018-11-16","endDate":"2026-05-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 increased from 31/12/2025 to 31/05/2026. This is primarily due to the following factors‚ Following Allwyn's Implementation Notice issued in November 2024, Fully Implemented Commencement was expected to be delivered by late 2025. Allwyn delivered digital cutover on the weekend of 24/25 January 2026 and the Commission's Board determined that they had delivered Fully Implemented Commencement on 19 March 2026. There are some final closure activities taking place between mid March and the end of May 2026 before the NISTA Gate 5a and Programme closure.","fyBaseline":16.9,"fyForecast":14.3,"fyVariance":15.42,"varianceNarrative":"Reliance on external legal and external consultants has reduced in 25/26 compared to budget, and has been reprofiled into 26/27. No impact on overall life cost.","wholeLifeCost":174.46,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 increased from £154.8m to £168.2m (£13.4m). This is primarily due to the following factors: • 4NLR budget was increased by £8.36m: o Delay to Full Implementation causing BAU an Implementation to run in parallel o aspects of regulation have proved more complex and therefore more resource intensive for Licensing than anticipated o Retention of additional roles that were once considered to be required for bedding in period only, with additional support around enforcement, finance, and stakeholder management/project delivery o Increased contingency primarily to account for situations where additional legal resources or external advice is needed. • Programme and Recoverable Implementation Costs (RICs) budget was increased by £5.02m , we are currently working within the FBC Scenario 2 resource and timeline (RICs completion forecast 31 Jan 27), scenarios 3 & 4 increase the Programme by c2 months each. The increase was required to accommodate Allwyn’s delay in testing and loss of contingency time and not being able to deliver Full Functionality by the Fall Back Delayed Date in Feb ‘25 Please note figures referenced in the narratives were entered as nominal and the system automatically converts them to Real Terms.","benefits":24230.06,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained the same as last year at 20643.","themes":["Cost & funding","Delivery & schedule","Technical & integration","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 24/25-Q4, NISTA's Delivery Confidence Assessment rating at 25/26-Q3 increased from RED to AMBER.This is primarily due to the following factors‚ during 25/26, Allwyn were able to successfully complete both Retail (RCO) and Digital Cutover (DCO) activities bringing the project in line with expected deadlines. Following AELs delivery…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"DCMS_0013_1819-Q3","year":2020,"name":"4th National Lottery Licence Competition","department":"DCMS","category":"Government Transformation and Service Delivery","description":"The project aims to run a competition to award the next National Lottery licence (4th), that delivers statutory duties of due propriety and player protection, while incentivising responsible innovation and maximising returns to good causes.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber, due primarily to the following factors; - The arrival of Rothschild & Co (R&Co) as lead advisors and recruitment of experienced Commercial Director, on secondment from Government Commercial Organisation, provided confidence that senior leadership was in place to manage the programme. - A more detailed schedule of market engagement commenced in September with a broader range of organisations including technology firms and finance providers in addition to established lottery operators. Since the Q2 1920 (30th September 2019) Amber IPA DCA, the following non-project operating environment activities have impacted the original Q2 IPA DCA; - The requirement to follow the HMT-led Treasury Approval Point (TAP) process, and specifically its deferral until after the March 2020 Budget, introduced a 3-month delay to the start of the competition. This action consumed programme contingency but the end date is unaltered, and delivery confidence unaffected because the delay was used to mature competition documentation and engage further with market. Since the Q2 1920 (30th September 2019) Amber IPA DCA, the following primary project actions have impacted the original Q2 IPA DCA; - The Draft Invitation to Apply (ITA) and draft Licence were published to market in December 2019 and feedback received in January 2020. This exercise flushed out a number of issues with the market and allowed us to address them in final versions of competition documentation, giving us greater confidence that our requirements would be understood and acceptable to potential applicants. - An extensive assurance and audit plan was delivered. Including: IPA Gateway 2 review; internal audit of Outline Business Case, Incentive Mechanism, and Evaluation Framework; engagement with Cabinet Office complex transactions team; shadow bid reviews to test how suppliers might 'game' competition; and testing of game assessment processes. These actions increased confidence in the quality of the competition documents and processes.","startDate":"2018-11-16","endDate":"2023-08-01","scheduleNarrative":"The scheduled project end date at Q2 1920 (30th September 2019) is 01/08/23, due primarily to the following factors; - The Third Licence expires in February 2023, followed by a 6-month project close down period. - Allows for up to 2 years transition period following the conclusion of the competition and award of Preferred Licensee. Since the Q2 1920 (30th September 2019) baseline project end date of 01/08/23, the following non-project operating environment activities have impacted the original Q2 baseline project end date; - The requirement to follow the HMT-led Treasury Approval Point (TAP) process, and specifically its deferral until after the March 2020 Budget, introduced a 3-month delay to the start of the competition. This action consumed programme contingency but the end date is unaltered. - The advent of the COVID-19 pandemic, and the possibility of multiple lockdowns, increases the risk that competition processes have to be extended. Delaying the result of the competition will reduce the period for transition and increases the risk of having to extend the Third Licence. Since the Q2 1920 (30th September 2019) baseline project end date of 01/08/23, the following primary project actions have impacted the original Q2 baseline project end date; - Whilst waiting for TAP (Treasury Approval Point) to convene, we took opportunity to conduct further engagement with market and share more information to help potential applicants prepare their responses when competition started. - We have conducted an impact analysis on the programme schedule of various COVID-19 lockdown scenarios and have revised Business Continuity Plans to improve preparedness and resilience.","fyBaseline":7.84,"fyForecast":13.21,"fyVariance":68.0,"varianceNarrative":"The 19/20 in-year baseline / forecast variance at Q2 1920 (30th September 2019) of 68%, is due primarily to the following factors; - Rescoped commercial strategy and approach in terms of the nature of the competition we were seeking to generate. Took opportunity to explore wider sources of investment capital and interest in the competition in the finance and technology sectors. - Appointment of Rothschild & Co (R&Co) as lead advisor to engage with the market, and changes to scope and timing of other contractors work. Since the Q2 1920 (30th September 2019) 19/20 in-year baseline / forecast variance of 68%, the following primary project actions have impacted the original Q2 19/20 in-year variance; - Improved programme and financial controls have been implemented to ensure the programme stays within the uplifted budget. - Gambling Commission appointed a permanent Chief Financial Officer and internal auditors have reviewed in-year costs and future budget estimates (in Outline Business Case).","wholeLifeCost":64.34,"costNarrative":"The baseline Whole Life Cost at Q2 1920 (30th September 2019) is �64.34 m, due primarily to the following factors; - Approximately half of the whole-life costs are incurred in the design of the Licence, running the competition for the operator, and managing the transition period from Third to Fourth National Lottery Licensee. - The cost of regulating the Fourth Licence for 10 years is the remainder of the whole-life costs. For the purposes of estimating at this stage, we assume the cost of regulation is the same as that for the Third Licence, c�3.15m/year. Since the Q2 1920 (30th September 2019) �64.34 m baseline Whole Life Cost, the following non-project operating environment activities have impacted the original baseline Q2 Whole Life Cost; - The requirement to follow the HMT-led Treasury Approval Point (TAP) process, and specifically its deferral until after the March 2020 Budget, introduced a 3-month delay to the start of the competition. Consequently, some programme costs have slipped into later years (FY21/22 and FY22/23). The impact will be confirmed in due course in the Full Business Case. Since the Q2 1920 (30th September 2019) �64.34 m baseline Whole Life Cost, the following primary project actions have impacted the original Q2 baseline Whole Life Cost; - In the course of developing the Outline Business Case, there was a re-appraisal of the resources required to run the competition effectively. Increasing the strength of the evaluation teams, both with Commission and external subject matter experts, will ensure a better quality process. - Decision to procure a Transition, Technology and Operations partner earlier than originally planned has increased whole-life costs, but will ensure the risks inherent in the transition period can be effectively managed.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Approvals & decisions","Commercial & supply chain","Delivery & schedule"],"evidenceExcerpt":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber, due primarily to the following factors; - The arrival of Rothschild & Co (R&Co) as lead advisors and recruitment of experienced Commercial Director, on secondment from Government Commercial Organisation, provided confidence that senior leadership was in place to…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2020","sourceLabel":"IPA Annual Report 2019-20"},{"id":"DCMS_0013_1819-Q3","year":2021,"name":"4th National Lottery Licence Competition","department":"DCMS","category":"Government Transformation and Service Delivery","description":"The 4th National Lottery Licence Competition Programme is responsible for ensuring the continuation of the National Lottery on the expiry of the current 3rd Licence in July 2023. This involves designing a new licence fit for the future and selecting an operator via a competitive application process who is able to continue to develop the National Lottery as a public asset in order to maximise the returns to good causes whilst also ensuring the highest standards of propriety and player protection.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber. This is primarily due to the following factors: The overall programme lifecycle delivery confidence was rated as AMBER by the Infrastructure and Projects Authority at the Gate 2 review undertaken at the end of July 2020, given the longer-term impact of COVID-19 on applicants and the overall risk profile of the Programme. The programme is confident that it will be in a position to improve the current IPA Amber rating within quarter 1 (21/22). The improvement will be demonstrated by agreeing the final timing for approval of the Full Business Case and the expected continuation of a high number and strength of applicants remaining active within the competition.","startDate":"2018-11-16","endDate":"2024-02-01","scheduleNarrative":"Compared to financial year 19/20-Q2, the project's end-date increased from 01 August 2023 to 01 February 2024 . This is primarily due to the following factors: The programme end date has moved from 1 Aug 23 to 1 Feb 24 in response to delays caused by Covid19. Potential applicants raised concerns about assembling application teams and preparing their applications during the lockdown restrictions so to ensure applicants didn't withdraw from the competition and to maintain a strong competitive field of applicants a six month extension to the programme was agreed. In order to delay the start of the 4th Licence by 6 months, it has been necessary to extend the existing 3rd Lottery licence by six months so there is no interruption to the National Lottery.","fyBaseline":16.35,"fyForecast":15.03,"fyVariance":-8.0,"varianceNarrative":"The budget variance exceeds 5%. The yearly costs are lower than expected because of the deferment of competition evaluation costs to the following year as well as cost savings made on professional services to support the programme as more activity was able to be undertaken in house. The competition evaluation costs were deferred because the initial engagement from applicants to the Invitation to Apply for the 4th Licence was much higher than expected resulting in additional time being required for them to submit their phase 1 applications which in turn pushed the evaluation period and costs into the following financial year. Although this has caused a slight delay, the level of engagement from applicants indicates a strong competition which should generate highly competitive applications.","wholeLifeCost":91.92,"costNarrative":"Compared to financial year 19/20-Q2, the projects Baseline Whole Life Cost increased from �64.34m to �91.92m. This is primarily due to the following factors: The increase in whole life costs is due to two main factors. Firstly, a more thorough and robust competition with far greater engagement with the market and potential applicants which has resulted in a strong and highly competitive competition. Secondly, the costs have also increased because of the six month extension to the programme in response to the delays caused by Covid19.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber. This is primarily due to the following factors: The overall programme lifecycle delivery confidence was rated as AMBER by the Infrastructure and Projects Authority at the Gate 2 review undertaken at the end of July 2020, given…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21"},{"id":"DCMS_0013_1819-Q3","year":2022,"name":"4th National Lottery Licence Competition","department":"DCMS","category":"Government Transformation and Service Delivery","description":"The 4th National Lottery Competition Programme is responsible for ensuring the continuation of the National Lottery on the current expiry of the current 3rd Licence at the end of January 2024. This involves designing a new licence fit for the future and selecting an operator via a competitive application process who is able to continue to develop the National Lottery as a public asset in order to maximise the returns to good causes whilst also ensuring the highest standards of propriety and player protection.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 remained at Amber ?The latest Infrastructure and Projects Authority (IPA) Gate 3 review and final report rated the Programme as Amber on its conclusion. All recommendations have been addressed by the Programme and supported the approval of the recent Full Business Case by HM Treasury approved in March 2022. The Programme has a DCA rating of amber. This is because there has been a delay to the Award Notification due to legal challenges post the competition outcome notification. The resulting delay to the start of the Implementation Period have the potential to significantly impact cost/time.","startDate":"2018-11-16","endDate":"2024-02-01","scheduleNarrative":"Compared to 2021-Q4, your project end-date remained scheduled to finish on 01 FEB 2024 . This is primarily due to the following factors: The programme end date of 1st February 2024 reflects the start of the 4th Licence.","fyBaseline":24.32,"fyForecast":24.32,"fyVariance":0.0,"varianceNarrative":"The budget variance is inferior or equal to 5%.","wholeLifeCost":155.0,"costNarrative":"Compared to2021-Q4, the projects Baseline Whole Life Cost increased from 91.92 (£m) to 154.87 (£m). This is primarily due to the following factors: The previous figure of £91.92 (£m) was used in the OBC addendum, it was noted in the return that Implementation Costs would increase whole life costs were submitted as part of the Full Business Case that was approved in March 2022. (The OBC cost are about evaluating few selected options before committing to one, which happens at FBC).","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 remained at Amber ?The latest Infrastructure and Projects Authority (IPA) Gate 3 review and final report rated the Programme as Amber on its conclusion. All recommendations have been addressed by the Programme and supported the…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"DCMS_0013_1819-Q3","year":2023,"name":"4th National Lottery Licence Competition","department":"DCMS","category":"Government Transformation and Service Delivery","description":"The 4th National Lottery Competition Programme is responsible for ensuring the continuation of the National Lottery on the current expiry of the current 3rd Licence at the end of January 2024. This involves designing a new licence fit for the future and selecting an operator via a competitive application process who is able to continue to develop the National Lottery as a public asset in order to maximise the returns to good causes whilst also ensuring the highest standards of propriety and player protection.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber (SRO rating). This is primarily due to the following factors. The latest Infrastructure and Projects Authority (IPA) Gate 3 review and final report rated the Programme as Amber on its conclusion. All recommendations have been addressed by the Programme. The Programme is currently in conversation with the IPA to plan the Gate 4 review, most likely to be in September 2023. Since last year, the Commission successfully applied to lift the suspension on the Programme and the licence was awarded to Allwyn UK Limited, and transition to the 4th Licence started. However, there continues to be a challenge to the outcome of the competition which the Commission is defending. The Programme's DCA rating remains Amber.","startDate":"2018-11-16","endDate":"2024-02-01","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2024-02-01. This is primarily due to the following factors. The programme end date of 1st February 2024 reflects the start of the 4th Licence.","fyBaseline":45.31,"fyForecast":19.64,"fyVariance":-57.0,"varianceNarrative":"The budget variance exceeds 5%. Due to delays in implementation caused by the legal cases, we are saving money on implementation in 22/23. Litigation costs have been added to the budget and forecast in 22/23 with the underspends in 22/23 added to the forecast in 23/24. Whole life project costs are now 177.47m; this has increased due to the additional litigation budget of 22.6m required for our court cases which was a contingent liability in our business case. The profiling of this is between 22/23 and 23/24. A delay in the court cases to January 2024 has caused variances between budgets and forecasts, however we have approval to carry over unused litigation budget to 23/24, preventing an overspend.","wholeLifeCost":177.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 increased from 155m. to 177m. This is primarily due to the following factors. The budget has increased due to Litigation costs, a budget of 22.6m has been provided.","benefits":22284.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 22284m. The project's departmental-agree monetised benefits at 22/23-Q4 is 22284m.The project's departmental-agree monetised benefits at 22/23-Q4 is 22284m.The project's departmental-agree monetised benefits at 22/23-Q4 is 22284m. As set out in the Final Business Case, the programmes benefits realisation approach comprises of 3 broad activities: programme-level evaluation, monitoring and evaluation of individual workstreams during implementation and monitoring and evaluation of the Commissions approach to regulating during the 4th Licence. During the implementation phase, the benefits reporting will focus on development of individual workstreams (as set out in the business case). The overall benefits of the programme (Increased returns to good causes) will be delivered by Allwyn and dependent on the implementation phase delivering. To note, it is the responsibility of the Incoming Licensee to develop its own methodology and forecasting for benefits during the 4th licence period - this will be provided to the Gambling Commission c.6 months prior to the start of the 4th licence and tracked throughout the licence.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber (SRO rating). This is primarily due to the following factors. The latest Infrastructure and Projects Authority (IPA) Gate 3 review and final report rated the Programme as Amber on its conclusion. All recommendations have been addressed by the…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"DCMS_0013_1819-Q3","year":2024,"name":"4th National Lottery Licence Competition","department":"DCMS","category":"Government Transformation and Service Delivery","description":"The 4th National Lottery Competition Programme is responsible for ensuring the continuation of the National Lottery on the current expiry of the current 3rd Licence at the end of January 2024. This involves designing a new licence fit for the future and selecting an operator via a competitive application process who is able to continue to develop the National Lottery as a public asset in order to maximise the returns to good causes whilst also ensuring the highest standards of propriety and player protection.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. The Infrastructure and Projects Authority (IPA) conducted its Gate 4a review in October 2023 and all recommendations have been addressed by the Programme, As agreed, Gate 4 was split into Part a and Part b with Part b due to take place in Autumn 2024 and focusing on Fully Implemented Commencement. The Programme is also undertaking an ongoing review by the Government Internal Audit Agency and the Programme's DCA rating remains Amber and in March 2024 underwent a DCMS Delivery and Risk Committee Audit.","startDate":"2018-11-16","endDate":"2025-02-28","scheduleNarrative":"The project's end-date at 23/24-Q4 is 2025-02-28. This is primarily due to the following factors. The Full Implementation Commencement date of 28th February 2025 reflects the main delivery deadline. The GC's 4NL Programme end date is set as May 2025, to ensure closure after FIC.","fyBaseline":15.59,"fyForecast":12.56,"fyVariance":-19.0,"varianceNarrative":"The budget variance exceeds 5%. The baseline figures have been revised as per the FBC Addendum v2 due to a reprofiling process. The year in under spend of -3m will be used in contingency. The variance is due to litigation costs reducing due to in house work. Cross charges from the Gambling commission reduced as estimates were replaced by actual figures.","wholeLifeCost":177.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agreed Whole Life Cost at 23/24-Q4 remained at 177m.","benefits":20643.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agreed monetised benefits at 23/24-Q4 decreased from 22284m. to 20643m. The decrease between 22/23 and 23/24 in monetised benefits noted above is due to revised assumptions over the period to reflect the passage of time, and are set out in the Business Case Addendum v2. Specifically these relate to changes in the prevailing macro-economic environment, leading to a revised assumed baseline figure for the exit point of the preceding 3rd Licence, and updated forecast sales assumptions over the Incoming Licensee's tenure, among other factors.","themes":["Cost & funding","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. The Infrastructure and Projects Authority (IPA) conducted its Gate 4a review in October 2023 and all recommendations have been addressed by the Programme, As agreed, Gate 4 was split into Part a and Part b with Part b…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"DCMS_0013_1819-Q3","year":2025,"name":"4th National Lottery Licence","department":"DCMS","category":"Government Transformation and Service Delivery","description":"The 4th National Lottery Competition Programme is responsible for ensuring the continuation of the National Lottery on the expiry of the 3rd Licence at the end of January 2024. This involved designing a new licence fit for the future and selecting an operator via a competitive application process who is able to continue to develop the National Lottery as a public asset in order to maximise the returns to good causes whilst also ensuring the highest standards of propriety and player protection.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 decreased from AMBER to RED. This is primarily due to the following factors‚ In the latter half of the 24/25 year, Allwyn suffered increasing delays and setbacks with testing across its work streams. Without any contingency remaining in the plan, it became increasingly unlikely that Fully Implemented Commencement (FIC) would be achieved by the delayed date in February 2025. The Programme's Delivery Confidence Assessment was therefore downgraded from Amber to Red.","startDate":"2018-11-16","endDate":"2025-12-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 28/02/2025 to 31/12/2025. This is primarily due to the following factors‚ In November 2024, Allwyn issued an Implementation Issue Notice to formally notify the Commission that the Fully Implemented Commencement would not be achieved by February 2025 as expected. During the first half of 2025, Allwyn have been considering options to enable safe technical cutover of the digital front end platform which has consequently pushed the end date of the project to 31/12/25.","fyBaseline":17.0,"fyForecast":16.37,"fyVariance":3.71,"varianceNarrative":"The budget variance is less than or equal to 5%. n/a - less than 5%","wholeLifeCost":154.85,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 177 to 154. This is primarily due to the following factors‚ The 23/24 report incorrectly included £23m of litigation costs in the return. The litigation budget sits outside of the WLC for 4NL so the 24/25 return for WLC was reduced from £177m to £154m in line with the FBC.","benefits":20643.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 20643. This is primarily due to the following factors‚ There has been no change to the benefits","themes":["Cost & funding","Technical & integration","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 decreased from AMBER to RED. This is primarily due to the following factors‚ In the latter half of the 24/25 year, Allwyn suffered increasing delays and setbacks with testing across its work streams. Without any contingency remaining…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"DCMS_0013_1819-Q3","year":2026,"name":"4th National Lottery Licence","department":"DCMS","category":"Government Transformation and Service Delivery","description":"The 4th National Lottery Competition Programme is responsible for ensuring the continuation of the National Lottery on the expiry of the 3rd Licence at the end of January 2024. This involved designing a new licence fit for the future and selecting an operator via a competitive application process who is able to continue to develop the National Lottery as a public asset in order to maximise the returns to good causes whilst also ensuring the highest standards of propriety and player protection.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25-Q4, NISTA's Delivery Confidence Assessment rating at 25/26-Q3 increased from RED to AMBER.This is primarily due to the following factors‚ during 25/26, Allwyn were able to successfully complete both Retail (RCO) and Digital Cutover (DCO) activities bringing the project in line with expected deadlines. Following AELs delivery of DCO in January 2026 the Programme increased from AMBER to GREEN (25/26-Q4).","startDate":"2018-11-16","endDate":"2026-05-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 increased from 31/12/2025 to 31/05/2026. This is primarily due to the following factors‚ Following Allwyn's Implementation Notice issued in November 2024, Fully Implemented Commencement was expected to be delivered by late 2025. Allwyn delivered digital cutover on the weekend of 24/25 January 2026 and the Commission's Board determined that they had delivered Fully Implemented Commencement on 19 March 2026. There are some final closure activities taking place between mid March and the end of May 2026 before the NISTA Gate 5a and Programme closure.","fyBaseline":16.9,"fyForecast":14.3,"fyVariance":15.42,"varianceNarrative":"Reliance on external legal and external consultants has reduced in 25/26 compared to budget, and has been reprofiled into 26/27. No impact on overall life cost.","wholeLifeCost":174.46,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 increased from £154.8m to £168.2m (£13.4m). This is primarily due to the following factors: • 4NLR budget was increased by £8.36m: o Delay to Full Implementation causing BAU an Implementation to run in parallel o aspects of regulation have proved more complex and therefore more resource intensive for Licensing than anticipated o Retention of additional roles that were once considered to be required for bedding in period only, with additional support around enforcement, finance, and stakeholder management/project delivery o Increased contingency primarily to account for situations where additional legal resources or external advice is needed. • Programme and Recoverable Implementation Costs (RICs) budget was increased by £5.02m , we are currently working within the FBC Scenario 2 resource and timeline (RICs completion forecast 31 Jan 27), scenarios 3 & 4 increase the Programme by c2 months each. The increase was required to accommodate Allwyn’s delay in testing and loss of contingency time and not being able to deliver Full Functionality by the Fall Back Delayed Date in Feb ‘25 Please note figures referenced in the narratives were entered as nominal and the system automatically converts them to Real Terms.","benefits":24230.06,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained the same as last year at 20643.","themes":["Cost & funding","Delivery & schedule","Technical & integration","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 24/25-Q4, NISTA's Delivery Confidence Assessment rating at 25/26-Q3 increased from RED to AMBER.This is primarily due to the following factors‚ during 25/26, Allwyn were able to successfully complete both Retail (RCO) and Digital Cutover (DCO) activities bringing the project in line with expected deadlines. Following AELs delivery…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"DCMS_0013_1819-Q3","year":2025,"name":"4th National Lottery Licence","department":"DCMS","category":"Government Transformation and Service Delivery","description":"The 4th National Lottery Competition Programme is responsible for ensuring the continuation of the National Lottery on the expiry of the 3rd Licence at the end of January 2024. This involved designing a new licence fit for the future and selecting an operator via a competitive application process who is able to continue to develop the National Lottery as a public asset in order to maximise the returns to good causes whilst also ensuring the highest standards of propriety and player protection.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 decreased from AMBER to RED. This is primarily due to the following factors‚ In the latter half of the 24/25 year, Allwyn suffered increasing delays and setbacks with testing across its work streams. Without any contingency remaining in the plan, it became increasingly unlikely that Fully Implemented Commencement (FIC) would be achieved by the delayed date in February 2025. The Programme's Delivery Confidence Assessment was therefore downgraded from Amber to Red.","startDate":"2018-11-16","endDate":"2025-12-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 28/02/2025 to 31/12/2025. This is primarily due to the following factors‚ In November 2024, Allwyn issued an Implementation Issue Notice to formally notify the Commission that the Fully Implemented Commencement would not be achieved by February 2025 as expected. During the first half of 2025, Allwyn have been considering options to enable safe technical cutover of the digital front end platform which has consequently pushed the end date of the project to 31/12/25.","fyBaseline":17.0,"fyForecast":16.37,"fyVariance":3.71,"varianceNarrative":"The budget variance is less than or equal to 5%. n/a - less than 5%","wholeLifeCost":154.85,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 177 to 154. This is primarily due to the following factors‚ The 23/24 report incorrectly included £23m of litigation costs in the return. The litigation budget sits outside of the WLC for 4NL so the 24/25 return for WLC was reduced from £177m to £154m in line with the FBC.","benefits":20643.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 20643. This is primarily due to the following factors‚ There has been no change to the benefits","themes":["Cost & funding","Technical & integration","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 decreased from AMBER to RED. This is primarily due to the following factors‚ In the latter half of the 24/25 year, Allwyn suffered increasing delays and setbacks with testing across its work streams. Without any contingency remaining…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":-1,"transition":"Improved","endDateDeltaDays":151,"attentionScore":31,"attentionReasons":["Current published delivery confidence is Amber","Published end date moved 151 days later","In-year forecast variance is +15.4%"]},{"id":"MOJ_0058_2122-Q1","year":2026,"name":"Electronic Monitoring Expansion","department":"MOJ","category":"Government Transformation and Service Delivery","description":"The Electronic Monitoring Expansion Programme seeks to expand the impact, use and efficiency of electronic monitoring as a tool for the management of offenders in the community, helping reduce re-offending and protecting the public. The programme's aims include - effectively retendering the current service, increasing the scope and reach of electronic monitoring, building a more comprehensive evidence base, and more closely embedding the electronic monitoring service within the Probation service.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25-Q4, the NISTA Delivery Confidence Assessment (DCA) rating for 25/26-Q4 remains at Amber. This is primarily due to delays in migration to a new service requiring legacy contract extensions, with limited schedule contingency remaining.","startDate":"2021-01-01","endDate":"2026-06-15","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end date at 25/26-Q4 changed from 30/11/25 to 15/06/26.This is primarily due to delays in migration to a new service.","fyBaseline":145.46,"fyForecast":154.68,"fyVariance":6.34,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the increased costs of the contract extension within the financial year.","wholeLifeCost":1161.1,"costNarrative":"Compared to financial year 24/25-Q4, the project's Whole Life Costs at 25/26-Q4 increased from £857.610m to £1,161.10m. This is primarily due to an increased demand for Electronic Monitoring services being greater than the modelling that informed the original business case. All costs have been reported in 2024/25 base prices in line with NISTA requirements. This is a change from previous years where costs were reported in nominal prices. All costs reflect this accounting reduction regardless of any actual changes.","benefits":null,"benefitsNarrative":"The programme currently reports no monetised benefits. The project's benefits focus on the successful operation of Electronic Monitoring.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Technical & integration"],"evidenceExcerpt":"Compared to financial year 24/25-Q4, the NISTA Delivery Confidence Assessment (DCA) rating for 25/26-Q4 remains at Amber. This is primarily due to delays in migration to a new service requiring legacy contract extensions, with limited schedule contingency remaining. Compared to financial year 24/25-Q4, the programme's end date at 25/26-Q4 changed from…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"MOJ_0058_2122-Q1","year":2022,"name":"Electronic Monitoring Expansion","department":"MOJ","category":"Government Transformation and Service Delivery","description":"The Electronic Monitoring Expansion Programme seeks to expand the impact, use and efficacy of electronic monitoring as a tool for the management of offenders in the community, helping reduce reoffending and protecting the public. The programme's aims include - effectively retendering the current service, increasing the scope and reach of electronic monitoring, building a more comprehensive evidence base, and more closely aligning the electronic monitoring with the probation service.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 is Amber. This is the first time data has been published for this project, which has been added to GMPP over the last year. The DCA is Amber primarily due to the following factors: The timeframes for the delivery of the Future Service remain achievable but there is limited contingency. To date the project has delivered alcohol abstinence monitoring requirements for community sentences, alcohol monitoring on licence in wales, Acquisitive Crime location monitoring in 19 police forces, and Home Office Immigration Enforcement non-fitted devices.","startDate":"2021-01-01","endDate":"2024-12-31","scheduleNarrative":"Compared to 20/21 Q4, the project end date has remained static. Overall delivery across Electronic Monitoring Expansion continues to deliver at pace and the programme remains on track to complete within the timescale.","fyBaseline":73.86,"fyForecast":73.86,"fyVariance":0.0,"varianceNarrative":"The in year variance is below or equal to 5% so no narrative is required.","wholeLifeCost":1214.0,"costNarrative":"Your projects Baseline Whole Life Cost is 1213.62 (£m). This is primarily due to the following factors: Electronic Monitoring Expansion and Future Service costs are comprised of 3 elements: EM Live Service: The existing ongoing costs of running the EM Service. EM Expansion Programme: New one-off costs associated with the design and implementation of future waves of expansion projects, and where applicable New ongoing costs of running Expansion projects which are accepted into Live Service. EM Future Service: One-off costs to implement the EM 2024 re-procurement.","benefits":null,"benefitsNarrative":"","themes":["Delivery & schedule","Cost & funding","Commercial & supply chain","Scope & requirements"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 is Amber. This is the first time data has been published for this project, which has been added to GMPP over the last year. The DCA is Amber primarily due to the following factors: The timeframes for the delivery of the Future Service remain achievable but there is…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"MOJ_0058_2122-Q1","year":2023,"name":"Electronic Monitoring Expansion","department":"MOJ","category":"Government Transformation and Service Delivery","description":"The Electronic Monitoring Expansion Programme seeks to expand the impact, use and efficiency of electronic monitoring as a tool for the management of offenders in the community, helping reduce re-offending and protecting the public. The programme's aims include - effectively retendering the current service, increasing the scope and reach of electronic monitoring, building a more comprehensive evidence base, and more closely embedding the electronic monitoring service within the Probation service","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber (IPA rating). This is primarily due to the following factors. Compared to21/22 Q4, theproject'sDelivery Confidence Assessment rating remained Amber. The Amber assessment is due to timetable risks and recruitment challenges.A number of new initiatives to expand and enhance the current provision have been successfully delivered.","startDate":"2021-01-01","endDate":"2024-12-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2024-12-31. This is primarily due to the following factors. The programme is on track against the current baseline plan.","fyBaseline":162.66,"fyForecast":88.38,"fyVariance":-46.0,"varianceNarrative":"The underspend is due to delays with operational recruitment andcaseload being below forecast.","wholeLifeCost":1214.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 remained at 1214m. This is primarily due to the following factors. The Whole Life Cost has remained static, and the budget remains aligned to the current baseline business case.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This project currently reports no monetised benefits. The project's benefits will be defined monetarily at a later stage and following the completion of the procurement of new service delivery contracts and current pilot projects.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber (IPA rating). This is primarily due to the following factors. Compared to21/22 Q4, theproject'sDelivery Confidence Assessment rating remained Amber. The Amber assessment is due to timetable risks and recruitment challenges.A number of new initiatives…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"MOJ_0058_2122-Q1","year":2024,"name":"Electronic Monitoring Expansion","department":"MOJ","category":"Government Transformation and Service Delivery","description":"The Electronic Monitoring Expansion Programme seeks to expand the impact, use and efficiency of electronic monitoring as a tool for the management of offenders in the community, helping reduce re-offending and protecting the public. The programme's aims include - effectively retendering the current service, increasing the scope and reach of electronic monitoring, building a more comprehensive evidence base, and more closely embedding the electronic monitoring service within the Probation Service.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. New contracts have been awarded, however there is limited mobilisation schedule contingency.","startDate":"2021-01-01","endDate":"2024-12-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2024-12-31. This is primarily due to the following factors. The project remains on track for completion in line with the current baseline schedule.","fyBaseline":117.67,"fyForecast":108.36,"fyVariance":-8.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The underspend is due to unspent Optimism Bias and reduced in-year activities requiring costs to be re-profiled into future years.","wholeLifeCost":858.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 decreased from 1214m. to 858m. This is primarily due to the following factors. The decrease is due to contract savings.","benefits":0.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 0m. This project currently reports no monetised benefits. The project's benefits are related to the successful operation of Electronic Monitoring.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. New contracts have been awarded, however there is limited mobilisation schedule contingency. Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"MOJ_0058_2122-Q1","year":2025,"name":"Electronic Monitoring Expansion","department":"MoJ","category":"Government Transformation and Service Delivery","description":"The Electronic Monitoring Expansion Programme seeks to expand the impact, use and efficiency of electronic monitoring as a tool for the management of offenders in the community, helping reduce re-offending and protecting the public. The programme's aims include - effectively retendering the current service, increasing the scope and reach of electronic monitoring, building a more comprehensive evidence base, and more closely embedding the electronic monitoring service within the Probation Service.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The schedule has been re-baselined following supplier driven implementation delays, but there remain limited schedule contingency.","startDate":"2021-01-01","endDate":"2025-11-30","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/12/2024 to 30/11/2025. This is primarily due to the following factors‚ The schedule has been re-baselined following supplier driven implementation delays.","fyBaseline":131.4,"fyForecast":138.5,"fyVariance":5.4,"varianceNarrative":"The budget variance is inferior or equal to 5%.","wholeLifeCost":857.61,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remains the same at 858. This is primarily due to the following factors‚ The Whole Life Cost has remained static, and the budget remains aligned to the current baseline business case.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ The project currently reports no monetised benefits. The project's benefits focus on the successful operation of Electronic Monitoring.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The schedule has been re-baselined following supplier driven implementation delays, but there remain limited schedule contingency. Compared to financial year…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"MOJ_0058_2122-Q1","year":2026,"name":"Electronic Monitoring Expansion","department":"MOJ","category":"Government Transformation and Service Delivery","description":"The Electronic Monitoring Expansion Programme seeks to expand the impact, use and efficiency of electronic monitoring as a tool for the management of offenders in the community, helping reduce re-offending and protecting the public. The programme's aims include - effectively retendering the current service, increasing the scope and reach of electronic monitoring, building a more comprehensive evidence base, and more closely embedding the electronic monitoring service within the Probation service.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25-Q4, the NISTA Delivery Confidence Assessment (DCA) rating for 25/26-Q4 remains at Amber. This is primarily due to delays in migration to a new service requiring legacy contract extensions, with limited schedule contingency remaining.","startDate":"2021-01-01","endDate":"2026-06-15","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end date at 25/26-Q4 changed from 30/11/25 to 15/06/26.This is primarily due to delays in migration to a new service.","fyBaseline":145.46,"fyForecast":154.68,"fyVariance":6.34,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the increased costs of the contract extension within the financial year.","wholeLifeCost":1161.1,"costNarrative":"Compared to financial year 24/25-Q4, the project's Whole Life Costs at 25/26-Q4 increased from £857.610m to £1,161.10m. This is primarily due to an increased demand for Electronic Monitoring services being greater than the modelling that informed the original business case. All costs have been reported in 2024/25 base prices in line with NISTA requirements. This is a change from previous years where costs were reported in nominal prices. All costs reflect this accounting reduction regardless of any actual changes.","benefits":null,"benefitsNarrative":"The programme currently reports no monetised benefits. The project's benefits focus on the successful operation of Electronic Monitoring.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Technical & integration"],"evidenceExcerpt":"Compared to financial year 24/25-Q4, the NISTA Delivery Confidence Assessment (DCA) rating for 25/26-Q4 remains at Amber. This is primarily due to delays in migration to a new service requiring legacy contract extensions, with limited schedule contingency remaining. Compared to financial year 24/25-Q4, the programme's end date at 25/26-Q4 changed from…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"MOJ_0058_2122-Q1","year":2025,"name":"Electronic Monitoring Expansion","department":"MoJ","category":"Government Transformation and Service Delivery","description":"The Electronic Monitoring Expansion Programme seeks to expand the impact, use and efficiency of electronic monitoring as a tool for the management of offenders in the community, helping reduce re-offending and protecting the public. The programme's aims include - effectively retendering the current service, increasing the scope and reach of electronic monitoring, building a more comprehensive evidence base, and more closely embedding the electronic monitoring service within the Probation Service.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The schedule has been re-baselined following supplier driven implementation delays, but there remain limited schedule contingency.","startDate":"2021-01-01","endDate":"2025-11-30","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/12/2024 to 30/11/2025. This is primarily due to the following factors‚ The schedule has been re-baselined following supplier driven implementation delays.","fyBaseline":131.4,"fyForecast":138.5,"fyVariance":5.4,"varianceNarrative":"The budget variance is inferior or equal to 5%.","wholeLifeCost":857.61,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remains the same at 858. This is primarily due to the following factors‚ The Whole Life Cost has remained static, and the budget remains aligned to the current baseline business case.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ The project currently reports no monetised benefits. The project's benefits focus on the successful operation of Electronic Monitoring.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The schedule has been re-baselined following supplier driven implementation delays, but there remain limited schedule contingency. Compared to financial year…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":197,"attentionScore":31,"attentionReasons":["Current published delivery confidence is Amber","Published end date moved 197 days later","In-year forecast variance is +6.3%"]},{"id":"HMRC_0543_2526-Q2","year":2026,"name":"Enterprise Customer Relationship Management (eCRM)","department":"HMRC","category":"Government Transformation and Service Delivery","description":"ECRM will modernise how HMRC understands and supports customers by replacing fragmented legacy systems with a single enterprise CRM platform. This will give staff a complete view of customer interactions, enabling faster, more consistent resolution and simpler services for customers. ECRM will simplify how services are designed and delivered, reduce avoidable contact, strengthen compliance, and cut reliance on ageing systems. It establishes a long-term platform for continuous improvement, enabling HMRC to deliver fully joined-up services at scale.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The programme is moving from set-up into active delivery, with commercial activity well advanced and a multidisciplinary delivery model now in place. ECRM has established a single, integrated team focused on delivering priority use cases early, building confidence through real delivery and rapid learning. The focus is now on sustaining a consistent delivery rhythm—securing the core platform, sequencing delivery across services and ensuring business readiness so that capability is adopted and value is realised. This approach prioritises early outcomes while building the foundation for enterprise-wide transformation.","startDate":"2025-04-01","endDate":"2030-03-29","scheduleNarrative":"ECRM is a phased, multi-year transformation to establish a single core SaaS CRM platform across HMRC while maintaining stable services. Delivery is focused on priority services, enabling early capability to be deployed, tested and refined in live environments. Future phases will scale this approach across the organisation, shaped by procurement outcomes, delivery learning and the sequencing of dependencies across services and systems. This ensures early value is delivered while maintaining control of risk and service continuity.","fyBaseline":12.44,"fyForecast":7.98,"fyVariance":35.83,"varianceNarrative":"The budget variance exceeds 5%. This reflects the programme having only recently entered the end to end delivery lifecycle, when forecasts were necessarily high-level and based on early assumptions. As delivery plans matured, scope was defined in greater detail and commercial positions were firmed, including contracted activity and evidenced recharges. These changes resulted in a reduction to forecast costs and provide increased confidence that the outturn now reflects confirmed delivery intent rather than indicative early estimates.","wholeLifeCost":256.75,"costNarrative":"Whole Life Cost estimates remain indicative and will be refined as procurement concludes and the delivery roadmap matures. Costs reflect the scale of implementing a core CRM platform, delivering priority use cases and managing the phased transition from legacy systems. Investment is being agreed incrementally in tranches to maintain affordability, value for money and delivery control, with future commitments aligned to confirmed scope, commercial outcomes and demonstrated progress.","benefits":700.92,"benefitsNarrative":"ECRM will deliver direct benefits from early use cases and enabling benefits as the platform is adopted across services. Clear ownership and attribution are being established, with benefits recognised only where supported by delivery evidence and approved business cases. The benefits position will strengthen as delivery scales, adoption increases and legacy systems are retired. Realising full value depends on sustained business adoption alongside delivery of the core platform capability.","themes":["Delivery & schedule","Commercial & supply chain","Cost & funding","Scope & requirements"],"evidenceExcerpt":"The programme is moving from set-up into active delivery, with commercial activity well advanced and a multidisciplinary delivery model now in place. ECRM has established a single, integrated team focused on delivering priority use cases early, building confidence through real delivery and rapid learning. The focus is now on sustaining a consistent delivery…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"HMRC_0543_2526-Q2","year":2026,"name":"Enterprise Customer Relationship Management (eCRM)","department":"HMRC","category":"Government Transformation and Service Delivery","description":"ECRM will modernise how HMRC understands and supports customers by replacing fragmented legacy systems with a single enterprise CRM platform. This will give staff a complete view of customer interactions, enabling faster, more consistent resolution and simpler services for customers. ECRM will simplify how services are designed and delivered, reduce avoidable contact, strengthen compliance, and cut reliance on ageing systems. It establishes a long-term platform for continuous improvement, enabling HMRC to deliver fully joined-up services at scale.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The programme is moving from set-up into active delivery, with commercial activity well advanced and a multidisciplinary delivery model now in place. ECRM has established a single, integrated team focused on delivering priority use cases early, building confidence through real delivery and rapid learning. The focus is now on sustaining a consistent delivery rhythm—securing the core platform, sequencing delivery across services and ensuring business readiness so that capability is adopted and value is realised. This approach prioritises early outcomes while building the foundation for enterprise-wide transformation.","startDate":"2025-04-01","endDate":"2030-03-29","scheduleNarrative":"ECRM is a phased, multi-year transformation to establish a single core SaaS CRM platform across HMRC while maintaining stable services. Delivery is focused on priority services, enabling early capability to be deployed, tested and refined in live environments. Future phases will scale this approach across the organisation, shaped by procurement outcomes, delivery learning and the sequencing of dependencies across services and systems. This ensures early value is delivered while maintaining control of risk and service continuity.","fyBaseline":12.44,"fyForecast":7.98,"fyVariance":35.83,"varianceNarrative":"The budget variance exceeds 5%. This reflects the programme having only recently entered the end to end delivery lifecycle, when forecasts were necessarily high-level and based on early assumptions. As delivery plans matured, scope was defined in greater detail and commercial positions were firmed, including contracted activity and evidenced recharges. These changes resulted in a reduction to forecast costs and provide increased confidence that the outturn now reflects confirmed delivery intent rather than indicative early estimates.","wholeLifeCost":256.75,"costNarrative":"Whole Life Cost estimates remain indicative and will be refined as procurement concludes and the delivery roadmap matures. Costs reflect the scale of implementing a core CRM platform, delivering priority use cases and managing the phased transition from legacy systems. Investment is being agreed incrementally in tranches to maintain affordability, value for money and delivery control, with future commitments aligned to confirmed scope, commercial outcomes and demonstrated progress.","benefits":700.92,"benefitsNarrative":"ECRM will deliver direct benefits from early use cases and enabling benefits as the platform is adopted across services. Clear ownership and attribution are being established, with benefits recognised only where supported by delivery evidence and approved business cases. The benefits position will strengthen as delivery scales, adoption increases and legacy systems are retired. Realising full value depends on sustained business adoption alongside delivery of the core platform capability.","themes":["Delivery & schedule","Commercial & supply chain","Cost & funding","Scope & requirements"],"evidenceExcerpt":"The programme is moving from set-up into active delivery, with commercial activity well advanced and a multidisciplinary delivery model now in place. ECRM has established a single, integrated team focused on delivering priority use cases early, building confidence through real delivery and rapid learning. The focus is now on sustaining a consistent delivery…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":null,"ratingDelta":null,"transition":"Not comparable","endDateDeltaDays":null,"attentionScore":30,"attentionReasons":["Current published delivery confidence is Amber","In-year forecast variance is +35.8%"]},{"id":"DESNZ_0471_2425-Q4","year":2026,"name":"Warm Homes: Local Grant","department":"DESNZ","category":"Infrastructure and Construction","description":"The Warm Homes: Local Grant (WH:LG) scheme is a government-funded, fuel poverty scheme delivered by Local Authorities. It was launched on 23 September 2024, and was allocated £500m through the Chancellor’s Budget on 30 October 2024 to be delivered from April 2025 to March 2028, with a portion of this funding delivered through devolution deals with mayoral combined authorities. This £500m funding is part of a wider package towards heat decarbonisation and household energy efficiency over the next three years, including funding to support fuel poverty schemes including WH:LG, helping in total around 225,000 households to reduce their energy bills by over £200. The £500m allocated to WH:LG provides grants to private, low-income households living in the worst performing (EPC bands D-G) homes in England to tackle fuel poverty and progress net zero 2050. The primary and secondary aims of WH:LG are: 1. To deliver progress towards the statutory fuel poverty target for England, by improving as many fuel-poor homes as reasonably practicable to energy efficiency rating of Band C by 2030, 2. To deliver progress towards Net Zero 2050, and the Carbon Budgets, by installing energy performance upgrades and low carbon heating in homes that drive carbon abatement.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Warm Homes: Local Grant (WH:LG) scheme delivered its 2025/26 budget and exceeded the budget and delivery through other financial mechanisms, by approximately 30%. Early data suggests Grant Recipients are on track to comply with key scheme value for money protections, such as cost caps and measure price limits. To note, while this is a positive early indicator that progress against the total scheme objectives is on track (reducing fuel poverty and saving carbon), benefits data on these objectives is not yet available. There are risks regarding scheme resourcing which are being actively managed, and as a result the delivery confidence has been set as Amber for Quarter 4 of Financial Year 2025/26.","startDate":"2024-09-05","endDate":"2028-09-01","scheduleNarrative":"In accordance to the Full Business Case, the Warm Homes: Local Grant scheme was launched on 23 September 2024, and was allocated £500m through the Chancellor’s Budget on 30 October 2024 to be delivered from April 2025 to March 2028. The schedule of delivery has not changed since the launch of the scheme and it remains on track to deliver.","fyBaseline":80.4,"fyForecast":110.42,"fyVariance":37.35,"varianceNarrative":"The budget variance exceeds 5%. This is due to an increase to the CDEL cost forecast, specifically CDEL grant funding. All other CDEL and RDEL cost forecasts are in line with the baseline. The CDEL grant funding forecast has risen in response to demand from Grant Recipients and as a result, WHLG has been able to increase the value of CDEL grant funding disbursed to Grant Recipients in 25/26, above the value of the baseline.","wholeLifeCost":454.52,"costNarrative":"In accordance with the Full Business Case, the Warm Homes: Local Grant scheme Whole Life Cost consists of CDEL (capital) grant funding disbursed to Grant Recipients for the delivery of energy efficiency measures, CDEL (capital) enabling costs associated with the delivery of those energy efficiency assets (including digital and delivery partner support), RDEL programme costs associated with front line project delivery, including evaluation and RDEL admin costs associated with staffing.","benefits":1068.55,"benefitsNarrative":"The baseline benefits have been quantified in accordance with the Full Business Case for the Warm Homes: Local Grant scheme. Baseline benefits consist of monetised energy savings (using long-run variable costs of energy supply values), carbon savings (traded and non-traded), air quality benefits, comfort benefits and health benefits.","themes":["Cost & funding","Delivery & schedule","Technical & integration","Approvals & decisions"],"evidenceExcerpt":"The Warm Homes: Local Grant (WH:LG) scheme delivered its 2025/26 budget and exceeded the budget and delivery through other financial mechanisms, by approximately 30%. Early data suggests Grant Recipients are on track to comply with key scheme value for money protections, such as cost caps and measure price limits. To note, while this is a positive early…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"DESNZ_0471_2425-Q4","year":2025,"name":"Warm Homes: Local Grant","department":"DESNZ","category":"ICT","description":"Warm Homes: Local Grant provides grants for energy performance measures and low carbon heating to privately owned, low-income households living in EPC band D-G homes in England to tackle fuel poverty and deliver progress towards Net Zero 2050 and the Carbon Budgets. £500 million was allocated to the scheme in the 2024 Autumn Budget to be delivered by Local Authorities from April 2025 to March 2028. WH:LG has funded 74 projects involving 271 local authorities (97% of eligible local authorities) across England. An Expression of Interest window ran from 16th October 2024 to 1st December 2024, with around £1.7bn of funding requested by Local Authorities.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Section 43 - Commercial interests","startDate":"2024-09-05","endDate":"2028-09-01","scheduleNarrative":"Section 43 - Commercial interests","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 43 - Commercial interests","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Section 43 - Commercial interests","themes":["Commercial & supply chain"],"evidenceExcerpt":"Section 43 - Commercial interests Section 43 - Commercial interests","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"DESNZ_0471_2425-Q4","year":2026,"name":"Warm Homes: Local Grant","department":"DESNZ","category":"Infrastructure and Construction","description":"The Warm Homes: Local Grant (WH:LG) scheme is a government-funded, fuel poverty scheme delivered by Local Authorities. It was launched on 23 September 2024, and was allocated £500m through the Chancellor’s Budget on 30 October 2024 to be delivered from April 2025 to March 2028, with a portion of this funding delivered through devolution deals with mayoral combined authorities. This £500m funding is part of a wider package towards heat decarbonisation and household energy efficiency over the next three years, including funding to support fuel poverty schemes including WH:LG, helping in total around 225,000 households to reduce their energy bills by over £200. The £500m allocated to WH:LG provides grants to private, low-income households living in the worst performing (EPC bands D-G) homes in England to tackle fuel poverty and progress net zero 2050. The primary and secondary aims of WH:LG are: 1. To deliver progress towards the statutory fuel poverty target for England, by improving as many fuel-poor homes as reasonably practicable to energy efficiency rating of Band C by 2030, 2. To deliver progress towards Net Zero 2050, and the Carbon Budgets, by installing energy performance upgrades and low carbon heating in homes that drive carbon abatement.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Warm Homes: Local Grant (WH:LG) scheme delivered its 2025/26 budget and exceeded the budget and delivery through other financial mechanisms, by approximately 30%. Early data suggests Grant Recipients are on track to comply with key scheme value for money protections, such as cost caps and measure price limits. To note, while this is a positive early indicator that progress against the total scheme objectives is on track (reducing fuel poverty and saving carbon), benefits data on these objectives is not yet available. There are risks regarding scheme resourcing which are being actively managed, and as a result the delivery confidence has been set as Amber for Quarter 4 of Financial Year 2025/26.","startDate":"2024-09-05","endDate":"2028-09-01","scheduleNarrative":"In accordance to the Full Business Case, the Warm Homes: Local Grant scheme was launched on 23 September 2024, and was allocated £500m through the Chancellor’s Budget on 30 October 2024 to be delivered from April 2025 to March 2028. The schedule of delivery has not changed since the launch of the scheme and it remains on track to deliver.","fyBaseline":80.4,"fyForecast":110.42,"fyVariance":37.35,"varianceNarrative":"The budget variance exceeds 5%. This is due to an increase to the CDEL cost forecast, specifically CDEL grant funding. All other CDEL and RDEL cost forecasts are in line with the baseline. The CDEL grant funding forecast has risen in response to demand from Grant Recipients and as a result, WHLG has been able to increase the value of CDEL grant funding disbursed to Grant Recipients in 25/26, above the value of the baseline.","wholeLifeCost":454.52,"costNarrative":"In accordance with the Full Business Case, the Warm Homes: Local Grant scheme Whole Life Cost consists of CDEL (capital) grant funding disbursed to Grant Recipients for the delivery of energy efficiency measures, CDEL (capital) enabling costs associated with the delivery of those energy efficiency assets (including digital and delivery partner support), RDEL programme costs associated with front line project delivery, including evaluation and RDEL admin costs associated with staffing.","benefits":1068.55,"benefitsNarrative":"The baseline benefits have been quantified in accordance with the Full Business Case for the Warm Homes: Local Grant scheme. Baseline benefits consist of monetised energy savings (using long-run variable costs of energy supply values), carbon savings (traded and non-traded), air quality benefits, comfort benefits and health benefits.","themes":["Cost & funding","Delivery & schedule","Technical & integration","Approvals & decisions"],"evidenceExcerpt":"The Warm Homes: Local Grant (WH:LG) scheme delivered its 2025/26 budget and exceeded the budget and delivery through other financial mechanisms, by approximately 30%. Early data suggests Grant Recipients are on track to comply with key scheme value for money protections, such as cost caps and measure price limits. To note, while this is a positive early…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"DESNZ_0471_2425-Q4","year":2025,"name":"Warm Homes: Local Grant","department":"DESNZ","category":"ICT","description":"Warm Homes: Local Grant provides grants for energy performance measures and low carbon heating to privately owned, low-income households living in EPC band D-G homes in England to tackle fuel poverty and deliver progress towards Net Zero 2050 and the Carbon Budgets. £500 million was allocated to the scheme in the 2024 Autumn Budget to be delivered by Local Authorities from April 2025 to March 2028. WH:LG has funded 74 projects involving 271 local authorities (97% of eligible local authorities) across England. An Expression of Interest window ran from 16th October 2024 to 1st December 2024, with around £1.7bn of funding requested by Local Authorities.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Section 43 - Commercial interests","startDate":"2024-09-05","endDate":"2028-09-01","scheduleNarrative":"Section 43 - Commercial interests","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 43 - Commercial interests","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Section 43 - Commercial interests","themes":["Commercial & supply chain"],"evidenceExcerpt":"Section 43 - Commercial interests Section 43 - Commercial interests","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":null,"transition":"Not comparable","endDateDeltaDays":0,"attentionScore":30,"attentionReasons":["Current published delivery confidence is Amber","In-year forecast variance is +37.4%"]},{"id":"DEFRA_0587_2526-Q3","year":2026,"name":"EU Delivery Programme","department":"DEFRA","category":"Government Transformation and Service Delivery","description":"The Defra EU Reset Portfolio Delivery Programme will deliver the Defra Outcome to is working to deliver and implement the UK-EU SPS agreement which will reduce trade barriers with the EU for food, plants and animals.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Delivery of the UK-EU Sanitary and Phytosanitary (SPS) Agreement by mid-2027 remains high risk but deliverable. We are working to assumptions on negotiations and the Parliamentary timetable - both outside the Programme’s direct control - which, if met, will make delivery by mid-2027 achievable.","startDate":null,"endDate":null,"scheduleNarrative":"The portfolio predicted end-date at 25/26-Q4 is scheduled to be 28/9/28. This is primarily due to the following factors: negotiations, Parliamentary timetable and ongoing work to embed and improve delivery mechanisms to realise the full benefits of the deal.","fyBaseline":28.09,"fyForecast":19.89,"fyVariance":29.19,"varianceNarrative":"The budget variance currently exceeds 5%. The variance primarily reflects recruitment challenges during the start up phase, which have slowed the planned ramp up of activity and deferred expenditure in some areas, including digital delivery, resulting in in year headroom against the approved estimate.","wholeLifeCost":832.04,"costNarrative":"The portfolio’s departmentally agreed Whole Life Cost at 25/26 -Q4 is £860m over four years. This is primarily due to the following factors: digital system development and upgrades, including access to EU agencies, systems and databases, staffing costs and fees associated with border control changes.","benefits":null,"benefitsNarrative":"The portfolio is still at the planning stage (Pre-Strategic Outline Case or equivalent) and is not yet in a position to provide specific cost/schedule information. The portfolio is expected to reduce unnecessary checks, paperwork and delays, helping food move more smoothly, reliably and efficiently through the supply chain. Smaller firms are disproportionately affected by high EU-related operational and compliance costs including complex paperwork, border delays and repeat certification costs. Delivering the SPS Agreement takes avoidable costs, delays and disruptions out of the food supply chain, potentially helping to ease pressure on food price inflation. By making trade with the EU easier, cheaper and quicker, the work of the programme reduces cost pressure on businesses, improves the flow of goods and strengthens the resilience of food supplies in a volatile global environment. The benefits of the programme and Agreement will build over time rather than immediately.","themes":["Delivery & schedule","Cost & funding","Technical & integration"],"evidenceExcerpt":"Delivery of the UK-EU Sanitary and Phytosanitary (SPS) Agreement by mid-2027 remains high risk but deliverable. We are working to assumptions on negotiations and the Parliamentary timetable - both outside the Programme’s direct control - which, if met, will make delivery by mid-2027 achievable. The portfolio predicted end-date at 25/26-Q4 is scheduled to be…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"DEFRA_0587_2526-Q3","year":2026,"name":"EU Delivery Programme","department":"DEFRA","category":"Government Transformation and Service Delivery","description":"The Defra EU Reset Portfolio Delivery Programme will deliver the Defra Outcome to is working to deliver and implement the UK-EU SPS agreement which will reduce trade barriers with the EU for food, plants and animals.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Delivery of the UK-EU Sanitary and Phytosanitary (SPS) Agreement by mid-2027 remains high risk but deliverable. We are working to assumptions on negotiations and the Parliamentary timetable - both outside the Programme’s direct control - which, if met, will make delivery by mid-2027 achievable.","startDate":null,"endDate":null,"scheduleNarrative":"The portfolio predicted end-date at 25/26-Q4 is scheduled to be 28/9/28. This is primarily due to the following factors: negotiations, Parliamentary timetable and ongoing work to embed and improve delivery mechanisms to realise the full benefits of the deal.","fyBaseline":28.09,"fyForecast":19.89,"fyVariance":29.19,"varianceNarrative":"The budget variance currently exceeds 5%. The variance primarily reflects recruitment challenges during the start up phase, which have slowed the planned ramp up of activity and deferred expenditure in some areas, including digital delivery, resulting in in year headroom against the approved estimate.","wholeLifeCost":832.04,"costNarrative":"The portfolio’s departmentally agreed Whole Life Cost at 25/26 -Q4 is £860m over four years. This is primarily due to the following factors: digital system development and upgrades, including access to EU agencies, systems and databases, staffing costs and fees associated with border control changes.","benefits":null,"benefitsNarrative":"The portfolio is still at the planning stage (Pre-Strategic Outline Case or equivalent) and is not yet in a position to provide specific cost/schedule information. The portfolio is expected to reduce unnecessary checks, paperwork and delays, helping food move more smoothly, reliably and efficiently through the supply chain. Smaller firms are disproportionately affected by high EU-related operational and compliance costs including complex paperwork, border delays and repeat certification costs. Delivering the SPS Agreement takes avoidable costs, delays and disruptions out of the food supply chain, potentially helping to ease pressure on food price inflation. By making trade with the EU easier, cheaper and quicker, the work of the programme reduces cost pressure on businesses, improves the flow of goods and strengthens the resilience of food supplies in a volatile global environment. The benefits of the programme and Agreement will build over time rather than immediately.","themes":["Delivery & schedule","Cost & funding","Technical & integration"],"evidenceExcerpt":"Delivery of the UK-EU Sanitary and Phytosanitary (SPS) Agreement by mid-2027 remains high risk but deliverable. We are working to assumptions on negotiations and the Parliamentary timetable - both outside the Programme’s direct control - which, if met, will make delivery by mid-2027 achievable. The portfolio predicted end-date at 25/26-Q4 is scheduled to be…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":null,"ratingDelta":null,"transition":"Not comparable","endDateDeltaDays":null,"attentionScore":28,"attentionReasons":["Current published delivery confidence is Amber","In-year forecast variance is +29.2%"]},{"id":"MOJ_0049_2122-Q3","year":2026,"name":"Evolve: Voice & Video","department":"MOJ","category":"Information and Communications Technology (ICT)","description":"Re-procurement of Voice and Video Services suitable for the current and future needs of the MoJ. The project includes requirements gathering, procurement preparation, competitive procurement and an increase in internal capability followed by the transition of services and exit of the existing contracts.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25-Q4, the Delivery Confidence Assessment (DCA) rating at 25/26-Q4 has increased to Green. This is primarily due to increased time contingency within plans, and significant activities being either complete or in progress in line with project plans.","startDate":"2021-09-27","endDate":"2028-07-14","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end date at 25/26-Q4 changed from 30/11/27 to 14/07/2028. This is primarily due to revision of planned activity timelines to increase contingency based on insights from lessons learned.","fyBaseline":24.06,"fyForecast":13.15,"fyVariance":45.34,"varianceNarrative":"The budget variance exceeds 5%. The underspend is due to reduced in-year activities, requiring costs to be re-profiled into future years.","wholeLifeCost":184.56,"costNarrative":"Compared to financial year 24/25-Q4, the project's Whole Life Costs at 25/26-Q4 have decreased from £385.21m to £184.56m. This is primarily due to significant savings following approval of Full Business Case. All costs have been reported in 2024/25 base prices in line with NISTA requirements. This is a change from previous years where costs were reported in nominal prices. All costs reflect this accounting reduction regardless of any actual changes.","benefits":69.01,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's monetised benefits at 25/26-Q4 have increased from £0 to £69.01m. This is primarily due to the confirmation of monetisation of benefits following approval of Full Business Case. All costs have been reported in 2024/25 base prices in line with NISTA requirements. This is a change from previous years where costs were reported in nominal prices. All costs will reflect this accounting reduction regardless of any actual changes.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 24/25-Q4, the Delivery Confidence Assessment (DCA) rating at 25/26-Q4 has increased to Green. This is primarily due to increased time contingency within plans, and significant activities being either complete or in progress in line with project plans. Compared to financial year 24/25-Q4, the project's end date at 25/26-Q4 changed…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"MOJ_0049_2122-Q3","year":2022,"name":"Evolve Voice & Video Services","department":"MOJ","category":"ICT","description":"Re-procurement of Voice and Video Services suitable for the current and future needs of the Authority, to replace the existing FITS Voice and Video (VVI) contract and comply with Public Procurement regulations. The project includes requirements gathering, ITT / Procurement preparation, competitive procurement followed by the transition of services and exit of the existing contracts.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 21/22-Q4 is Amber. This is the first time data has been published for this project, which has been added to GMPP over the last year. The DCA is Amber primarily due to the following factors: Delays with the start of procurement for the strategic contact centre service due to additional business scope and commercial preparation for that Procurement.","startDate":"2021-09-27","endDate":"2025-04-30","scheduleNarrative":"Your project end-date is 30 APR 2025. This is primarily due to the following factors: Project is still expecting to deliver to timescales, within the funding envelope in the Outline Business Case.","fyBaseline":2.6,"fyForecast":3.47,"fyVariance":33.0,"varianceNarrative":"The budget variance exceeds 5%. The Forecast was increased to reflect the need for additional contracted resources to accelerate delivery.","wholeLifeCost":206.0,"costNarrative":"Your projects Baseline Whole Life Cost is 206.30 (£m). This is primarily due to the following factors: RDEL One Off costs contain Project resources, Transition costs, Legal Fees & Delivery Partner costs RDEL On going costs will be BAU running costs for the new service","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 21/22-Q4 is Amber. This is the first time data has been published for this project, which has been added to GMPP over the last year. The DCA is Amber primarily due to the following factors: Delays with the start of procurement for the strategic contact centre service due to additional…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"MOJ_0049_2122-Q3","year":2023,"name":"Evolve: Voice & Video","department":"MOJ","category":"ICT","description":"Re-procurement of Voice and Video Services suitable for the current and future needs of the Authority, to replace the existing Future IT Services Voice and Video contracts. The project includes requirements gathering, ITT/Procurement preparation, competitive procurement and an increase in internal capability followed by the transition of services and exit of the existing contracts.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 21/22-Q4, Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 increased from Amber to Green. This is primarily due to the following factors. Compared to 21/22 Q4, the project's Delivery Confidence Assessment rating increased from Amber to Green.The Green assessment is due the project being on track against the re-baselined schedule and costs.","startDate":"2021-09-27","endDate":"2027-04-30","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 increased from 2025-04-30 to 2027-04-30. This is primarily due to the following factors. The project has re-baselined in January 2023 due to changes to procurement timelines.","fyBaseline":5.3,"fyForecast":7.03,"fyVariance":33.0,"varianceNarrative":"The overspend is due to increased resource costs, driven by the rebaselining activity.","wholeLifeCost":206.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 remained at 206m. This is primarily due to the following factors. The Whole Life Cost has remained static, and the budget remains aligned to the current baseline business case.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This project currently reports no monetised benefits. The project benefits focus on the continued quality of operation of voice and video services contracts.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 increased from Amber to Green. This is primarily due to the following factors. Compared to 21/22 Q4, the project's Delivery Confidence Assessment rating increased from Amber to Green.The Green assessment is due the project being on track against…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"MOJ_0049_2122-Q3","year":2024,"name":"Evolve: Voice & Video","department":"MOJ","category":"ICT","description":"Re-procurement of Voice and Video Services suitable for the current and future needs of the Authority, to replace the existing Future IT Services Voice and Video contracts. The project includes requirements gathering, Procurement preparation, competitive procurement and an increase in internal capability followed by the transition of services and exit of the existing contracts.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Green. This is primarily due to the following factors. The programme remains on track to deliver.","startDate":"2021-09-27","endDate":"2027-10-29","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 increased from 2027-04-30 to 2027-10-29. This is primarily due to the following factors. The programme has rebaselined its schedule to allow for effective exit and decommissioning activities during project closure.","fyBaseline":15.1,"fyForecast":9.5,"fyVariance":-37.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The underspend is due to reduced in-year activities requiring costs to be re-profiled into future years.","wholeLifeCost":206.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 remained at 206m. This is primarily due to the following factors. The Whole Life Cost has remained static, and the budget remains aligned to the current baseline business cases.","benefits":0.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 0m. This project currently reports no monetised benefits. The project's benefits focus on the continued quality of operation of Voice and Video Services Contracts","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Green. This is primarily due to the following factors. The programme remains on track to deliver. Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 increased from 2027-04-30 to 2027-10-29. This is primarily…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"MOJ_0049_2122-Q3","year":2025,"name":"Evolve: Voice & Video","department":"MoJ","category":"ICT","description":"Re-procurement of Voice and Video Services suitable for the current and future needs of the Authority, to replace the existing Future IT Services Voice and Video contracts. The project includes requirements gathering, Procurement preparation, competitive procurement and an increase in internal capability followed by the transition of services and exit of the existing contracts.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 decreased from GREEN to AMBER. This is primarily due to the following factors‚ Timetable risks due to complexity of multiple procurements mobilisations and limited schedule contingency.","startDate":"2021-09-27","endDate":"2027-11-30","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 29/10/2027 to 30/11/2027. This is primarily due to the following factors‚ Timetable risks due to complexity of multiple procurements mobilisations.","fyBaseline":31.85,"fyForecast":17.96,"fyVariance":43.61,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The underspend is due to reduce in-year activities, requiring costs to be re-profiled into future years.","wholeLifeCost":385.21,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 206 to 385. This is primarily due to the following factors‚ Outline Business Case update to include indexation across the contract duration and contingency, following an increase in scope, although WLC is forecast to reduce below 23/24 WLC following approval of Full Business Case.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ This project currently reports no monetised benefits. Confirmation of monetised benefits will be aligned to approval of Full Business Case.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 decreased from GREEN to AMBER. This is primarily due to the following factors‚ Timetable risks due to complexity of multiple procurements mobilisations and limited schedule contingency. Compared to financial year 23/24-Q4, the…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"MOJ_0049_2122-Q3","year":2026,"name":"Evolve: Voice & Video","department":"MOJ","category":"Information and Communications Technology (ICT)","description":"Re-procurement of Voice and Video Services suitable for the current and future needs of the MoJ. The project includes requirements gathering, procurement preparation, competitive procurement and an increase in internal capability followed by the transition of services and exit of the existing contracts.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25-Q4, the Delivery Confidence Assessment (DCA) rating at 25/26-Q4 has increased to Green. This is primarily due to increased time contingency within plans, and significant activities being either complete or in progress in line with project plans.","startDate":"2021-09-27","endDate":"2028-07-14","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end date at 25/26-Q4 changed from 30/11/27 to 14/07/2028. This is primarily due to revision of planned activity timelines to increase contingency based on insights from lessons learned.","fyBaseline":24.06,"fyForecast":13.15,"fyVariance":45.34,"varianceNarrative":"The budget variance exceeds 5%. The underspend is due to reduced in-year activities, requiring costs to be re-profiled into future years.","wholeLifeCost":184.56,"costNarrative":"Compared to financial year 24/25-Q4, the project's Whole Life Costs at 25/26-Q4 have decreased from £385.21m to £184.56m. This is primarily due to significant savings following approval of Full Business Case. All costs have been reported in 2024/25 base prices in line with NISTA requirements. This is a change from previous years where costs were reported in nominal prices. All costs reflect this accounting reduction regardless of any actual changes.","benefits":69.01,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's monetised benefits at 25/26-Q4 have increased from £0 to £69.01m. This is primarily due to the confirmation of monetisation of benefits following approval of Full Business Case. All costs have been reported in 2024/25 base prices in line with NISTA requirements. This is a change from previous years where costs were reported in nominal prices. All costs will reflect this accounting reduction regardless of any actual changes.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 24/25-Q4, the Delivery Confidence Assessment (DCA) rating at 25/26-Q4 has increased to Green. This is primarily due to increased time contingency within plans, and significant activities being either complete or in progress in line with project plans. Compared to financial year 24/25-Q4, the project's end date at 25/26-Q4 changed…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"MOJ_0049_2122-Q3","year":2025,"name":"Evolve: Voice & Video","department":"MoJ","category":"ICT","description":"Re-procurement of Voice and Video Services suitable for the current and future needs of the Authority, to replace the existing Future IT Services Voice and Video contracts. The project includes requirements gathering, Procurement preparation, competitive procurement and an increase in internal capability followed by the transition of services and exit of the existing contracts.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 decreased from GREEN to AMBER. This is primarily due to the following factors‚ Timetable risks due to complexity of multiple procurements mobilisations and limited schedule contingency.","startDate":"2021-09-27","endDate":"2027-11-30","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 29/10/2027 to 30/11/2027. This is primarily due to the following factors‚ Timetable risks due to complexity of multiple procurements mobilisations.","fyBaseline":31.85,"fyForecast":17.96,"fyVariance":43.61,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The underspend is due to reduce in-year activities, requiring costs to be re-profiled into future years.","wholeLifeCost":385.21,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 206 to 385. This is primarily due to the following factors‚ Outline Business Case update to include indexation across the contract duration and contingency, following an increase in scope, although WLC is forecast to reduce below 23/24 WLC following approval of Full Business Case.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ This project currently reports no monetised benefits. Confirmation of monetised benefits will be aligned to approval of Full Business Case.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 decreased from GREEN to AMBER. This is primarily due to the following factors‚ Timetable risks due to complexity of multiple procurements mobilisations and limited schedule contingency. Compared to financial year 23/24-Q4, the…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":-1,"transition":"Improved","endDateDeltaDays":227,"attentionScore":28,"attentionReasons":["Published end date moved 227 days later","In-year forecast variance is +45.3%"]},{"id":"DCMS_0020_2122-Q1","year":2026,"name":"Shared Rural Network","department":"DSIT","category":"Infrastructure and Construction","description":"The Shared Rural Network (SRN) programme is a deal between government and the four Mobile Network Operators (MNOs) - EE, Virgin Media O2, Vodafone and Three (with obligations flowing through to any subsequent merged entity). It has achieved its overarching objectives of delivering 4G coverage to 95% of UK landmass, 280,000 premises and 16,000km of roads over 12 months ahead of the programme deadline of the end of 2025, with the most significant coverage improvements in rural parts of Scotland and Wales. The SRN programme is split between public and privately funded elements and underpinned by the MNOs’ spectrum licence obligations. In line with the six-year capital funding period, the MNOs’ legally binding spectrum obligations for the SRN must be achieved by January 2027 and the programme will continue to deliver coverage improvements up to that point. Having achieved the overarching objectives of the SRN programme, government and the MNOs agreed a revised plan in July 2025 to target the remaining deployment of infrastructure in places where the benefits will be felt the most.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 increased to Green. This is primarily due to the programme having delivered its overarching objectives for coverage, premises and roads‚ a year ahead of schedule. The SRN Programme team has completed actions to implement the recommendations of the January 2025 Gateway 0 Review. These focused on refining the remaining delivery of the programme (given achievement of the overall objectives) to maximise effectiveness of the governance and value derived from the programme, improving communications to further align and strengthen stakeholder support, and ensuring the team's operating model is ready for the longer-term grant funding claims operation. The revised, targeted portfolio agreed with the MNOs in July 2025 is now in delivery alongside enhanced reporting requirements to monitor delivery progress effectively. BDUK has implemented a plan to support an increased volume of grant claims, which was informed by findings from a GIAA audit of the SRN programme’s grant management processes.","startDate":"2020-03-11","endDate":"2041-02-11","scheduleNarrative":"The Grant Agreement allocates funding up to and including FY 2040/41. The Transparency Notice was published on 11/03/2021, stating that SRN will start in February 2021 and is a 20-year programme. Publication of the Transparency Notice was delayed due to ongoing Brexit negotiations spilling over from 2020 to 2021. Funding could not be released until the Notice had been published and this in turn required changes to the Grant Agreement.","fyBaseline":94.44,"fyForecast":71.19,"fyVariance":24.62,"varianceNarrative":"Underspend in the 2025/26 budget has occurred due to reprofiling. This is the result of government working with the MNOs to revise the delivery plan in light of the SRN programme hitting its overall objectives over 12 months ahead of schedule. Underspend has also occurred due to slippage of MNO build activity into later financial years of the programme.","wholeLifeCost":328.19,"costNarrative":"The grant funding envelope was set by the HMT-approved business case in 2020 and continues to be sufficient to deliver the programme effectively. A reduction in the Whole Life Cost was made in 25/26 when the revised approach to the programme was agreed with the MNOs.","benefits":2128.05,"benefitsNarrative":"The benefits model was enhanced in late 2025 to improve accuracy, reflect new evidence and incorporate more granular data.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 increased to Green. This is primarily due to the programme having delivered its overarching objectives for coverage, premises and roads‚ a year ahead of schedule. The SRN Programme team has completed actions to implement the recommendations of the…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"DCMS_0020_2122-Q1","year":2022,"name":"Shared Rural Network","department":"DCMS","category":"Infrastructure and Construction","description":"The Shared Rural Network (SRN) programme is a £1 billion deal with the four Mobile Network Operators (MNOs) - EE, Three, Virgin Media O2, Vodafone - to deliver 4G coverage to 95% of UK landmass by the end of the programme, underpinned by spectrum obligations. The most significant coverage improvements will be in rural parts of Scotland, Northern Ireland and Wales, providing guaranteed coverage to 280,000 premises and 16,000 km of roads. The SRN programme is split between public and privately funded elements. In line with the six year capital funding period, the legally binding spectrum obligations for the SRN must be met by January 2027 and the programme will continue to deliver coverage improvements up to that point. The programme remains on track both the government and MNOs are confident that this combined coverage is expected to be delivered to 95% of UK geography by the end of 2025.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Senior Responsible Owner Delivery Confidence Assessment rating at 21/22-Q4 is Amber The SRN Programme team has resolved the majority of the recommendations including those deemed critical and essential in the June 2021 Gateway 0 Review. A number of recommendations focused on the relationship with the Home Office the key commercial site share agreement between the Mobile Network Operators and the Home Office. Significant progress has been made in both these areas the relationship with the Home Office is much stronger underpinned with stronger Governance and improved information sharing. And significant progress has been made on the site share agreement. Other recommendations focused on the Total Not Spot (TNS) project in terms of progressing the appointment of an Independent Assessor (which has been completed).","startDate":"2020-03-11","endDate":"2040-03-11","scheduleNarrative":"Your project end-date is 11 MAR 2040. This is primarily due to the following factors: SRN's end date is 01/01/2041","fyBaseline":4.2,"fyForecast":4.2,"fyVariance":0.0,"varianceNarrative":"The budget variance is inferior or equal to 5%. Not applicable","wholeLifeCost":512.0,"costNarrative":"Your projects Baseline Whole Life Cost is 511.80 (£m). This is primarily due to the following factors: Expenditure forecasts align to SR21.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Commercial & supply chain"],"evidenceExcerpt":"The Senior Responsible Owner Delivery Confidence Assessment rating at 21/22-Q4 is Amber The SRN Programme team has resolved the majority of the recommendations including those deemed critical and essential in the June 2021 Gateway 0 Review. A number of recommendations focused on the relationship with the Home Office the key commercial site share agreement…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"DCMS_0020_2122-Q1","year":2023,"name":"Shared Rural Network","department":"DSIT","category":"Infrastructure and Construction","description":"The Shared Rural Network (SRN) programme is a 1 billion deal with the four Mobile Network Operators (MNOs) - EE, Three, Virgin Media O2, Vodafone - to deliver 4G coverage to 95% of UK landmass by the end of the programme, underpinned by spectrum obligations. The most significant coverage improvements will be in rural parts of Scotland, Northern Ireland and Wales, providing guaranteed coverage to 280,000 premises and 16,000 km of roads. The SRN programme is split between public and privately funded elements. In line with the six year capital funding period, the legally binding spectrum obligations for the SRN must be met by January 2027 and the programme will continue to deliver coverage improvements up to that point. The programme remains on track both the government and MNOs are confident that this combined coverage is expected to be delivered to 95% of UK geography by the end of 2025.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 21/22-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. The SRN Programme team has resolved the majority of the recommendations including those deemed critical and essential in the November 2022 Gateway 0 Review. A number of recommendations focused on the relationship with the Home Office and the key commercial site share agreement between the Mobile Network Operators and the Home Office. Significant progress has been made in both these areas: The relationship with the Home Office is much stronger, underpinned with stronger Governance and improved information sharing between the organisations. The Programme has also actively worked on the recommendations including the need for the programme to keep evolving in preparation for its delivery phase; the team has increased PPM skills through successfully onboarding staff with extensive Project Delivery experience, with some joining from sponsorship and/or grant-distributing programmes.","startDate":"2020-03-11","endDate":"2040-03-11","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2040-03-11. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2040-03-11. This is primarily due to the following factors. Correction of previously incorrect information: The current Grant Agreement notes funding up to and including FY 2040/41. The Transparency Notice was published on 11/03/2021, stating that SRN will start in February 2021 and is a 20 year programme. Publication of the Transparency Notice was delayed due to ongoing Brexit negotiations spilling over from 2020 to 2021. Funding could not be released until the Notice had been published and this in turn required changes to the Grant Agreement.","fyBaseline":22.0,"fyForecast":7.5,"fyVariance":-66.0,"varianceNarrative":"The budget variance exceeds 5%. Not applicable","wholeLifeCost":512.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 remained at 512m. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 remained at 512m. This is primarily due to the following factors. Total expenditure (whole life costs) forecast aligns to the business case.","benefits":1351.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 1351m. The Shared Rural Network Programmes monetised benefits baseline and forecasts have been provided. These numbers were both generated for the Full Business Case in February 2020. Work to quantify the benefits involved a comprehensive literature review looking at the potential benefits of mobile coverage, before generating a shortlist of viable use cases and monetising them. Work is currently underway to improve our benefits predictions for the Shared Rural Network.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. The SRN Programme team has resolved the majority of the recommendations including those deemed critical and essential in the November 2022 Gateway 0 Review. A number of…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"DCMS_0020_2122-Q1","year":2024,"name":"Shared Rural Network","department":"DSIT","category":"Infrastructure and Construction","description":"The Shared Rural Network (SRN) programme is a 1 billion deal with the four Mobile Network Operators (MNOs) - EE, Three, Virgin Media_x000D_ O2, Vodafone - to deliver 4G coverage to 95% of UK landmass by the end of the programme, underpinned by spectrum licence obligations. The most significant coverage improvements will be in rural parts of Scotland and Wales. Uplifts in coverage during the programme will provide coverage to 280,000 premises and 16,000 km of roads. The SRN programme is split between public and privately funded elements. In line with the six year capital funding period, the legally binding spectrum obligations for the SRN must be met by January 2027 and the programme will continue to deliver coverage improvements up to that point. Whilst the programme has faced challenges and some delays, it remains on track, and both the government and MNOs are confident that this combined coverage is expected to be delivered to 95% of UK geography by the end of 2025.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The SRN Programme team has resolved all the recommendations in the November 2022 Gateway 0 Review. Some of these focused on the relationship with the Home Office (HO) and the key commercial site share agreement between the mobile network operators and the Home Office; significant progress has been made in both areas - the MSSA is signed by all parties. The relationship with HO is much stronger, underpinned with stronger Governance and improved information sharing. The Programme has also continued evolving into delivery phase; the team has increased project delivery skills through successfully onboarding of new staff, with some joining from sponsorship and/or grant-distributing programmes. _x000D_ Since the review in November 2022, the NAO has conducted a review of the SRN programme. Key recommendations centred on improving data sharing and ensuring maximal benefit for public money. BDUK is undertaking steps to act on these, working with its delivery partners.","startDate":"2020-03-11","endDate":"2040-03-11","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2040-03-11. This is primarily due to the following factors. The current Grant Agreement notes funding up to and including FY 2040/41. The Transparency Notice was published on 11/03/2021, stating that SRN will start in February 2021 and is a 20 year programme. Publication of the Transparency Notice was delayed due to ongoing Brexit negotiations spilling over from 2020 to 2021. Funding could not be released until the Notice had been published and this in turn required changes to the Grant Agreement.","fyBaseline":62.4,"fyForecast":15.21,"fyVariance":-76.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. Underspend in the current financial year due to reprofiling and slippage into later financial years of the programme.","wholeLifeCost":512.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 remained at 512m. This is primarily due to the following factors. The increase is due to rounding.","benefits":1351.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 1351m. The Shared Rural Network Programme's monetised benefits baseline and forecasts have been provided. These numbers were both generated for the Full Business Case in February 2020. Work to quantify the benefits involved a comprehensive literature review looking at the potential benefits of mobile coverage, before generating a shortlist of viable use cases and monetising them. Work is currently underway to improve our benefits predictions for the Shared Rural Network.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The SRN Programme team has resolved all the recommendations in the November 2022 Gateway 0 Review. Some of these focused on the relationship with the Home Office (HO) and the…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"DCMS_0020_2122-Q1","year":2025,"name":"Shared Rural Network","department":"DSIT","category":"Infrastructure and Construction","description":"The Shared Rural Network (SRN) programme is a deal between government and the four Mobile Network Operators (MNOs) - EE, Virgin Media O2, Vodafone and Three (with obligations flowing through to any subsequent merged entity). It has achieved its overarching objectives of delivering 4G coverage to 95% of UK landmass, 280,000 premises and 16,000km of roads over 12 months ahead of the programme deadline of the end of 2025, with the most significant coverage improvements in rural parts of Scotland and Wales. The SRN programme is split between public and privately funded elements and underpinned by the MNOs’ spectrum licence obligations. In line with the six-year capital funding period, the MNOs’ legally binding spectrum obligations for the SRN, which are still yet to be met, must be achieved by January 2027 and the programme will continue to deliver coverage improvements up to that point. Having achieved the overarching objectives of the SRN programme, government and the MNOs have worked together to agree a revised plan to target remaining deployment of infrastructure in places where the benefit will be felt the most.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The SRN Programme team is undertaking steps to act on the recommendations in the January 2025 Gateway 0 Review. These focused on refining the remaining delivery of the programme (given achievement of the overall objectives) to maximise effectiveness of the governance and value derived from the programme, improving communications to further align and strengthen stakeholder support, and ensuring the team's operating model is ready for the longer-term grant funding claims operation. Significant progress has been made in all areas: BDUK has agreed a revised, targeted delivery portfolio with the MNOs with improvements to the associated reporting requirements, Mova and BDUK own a joint communications strategy, and BDUK has a plan to support an increased volume of grant claims, which has also been informed by findings from a recent GIAA audit of the SRN programme’s grant management processes. Updates to the PAC recommendations were also published in March, confirming completion of cost assurance work, a refreshed benefits model, and improved access to management information to effectively monitor delivery progress.","startDate":"2020-03-11","endDate":"2040-03-11","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 11/03/2040. This is primarily due to the following factors‚ The Grant Agreement allocates funding up to and including FY 2040/41. The Transparency Notice was published on 11/03/2021, stating that SRN will start in February 2021 and is a 20-year programme. Publication of the Transparency Notice was delayed due to ongoing Brexit negotiations spilling over from 2020 to 2021. Funding could not be released until the Notice had been published and this in turn required changes to the Grant Agreement.","fyBaseline":95.4,"fyForecast":33.3,"fyVariance":65.09,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ Underspend in the current financial year has occurred due to reprofiling and slippage into later financial years of the programme. This is primarily the result of government working with the MNOs to revise the delivery plan in light of the SRN programme hitting its overall objectives over 12 months ahead of schedule.","wholeLifeCost":512.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 512. This is primarily due to the following factors‚ The grant funding envelope was set by the HMT-approved business case in 2020 and continues to be sufficient to deliver the programme effectively. A reduction in the Whole Life Cost can be expected for 25/26 when the revised approach to the programme that has been agreed with the MNOs, takes effect.","benefits":1351.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 1351. This is primarily due to the following factors‚ Benefits are accounted for in real prices (base year 2019/20) as they are adjusted for inflation over time. This is in line with the 2020 business case, which used real benefits (base year 2019/20).","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The SRN Programme team is undertaking steps to act on the recommendations in the January 2025 Gateway 0 Review. These focused on refining the remaining delivery of…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"DCMS_0020_2122-Q1","year":2026,"name":"Shared Rural Network","department":"DSIT","category":"Infrastructure and Construction","description":"The Shared Rural Network (SRN) programme is a deal between government and the four Mobile Network Operators (MNOs) - EE, Virgin Media O2, Vodafone and Three (with obligations flowing through to any subsequent merged entity). It has achieved its overarching objectives of delivering 4G coverage to 95% of UK landmass, 280,000 premises and 16,000km of roads over 12 months ahead of the programme deadline of the end of 2025, with the most significant coverage improvements in rural parts of Scotland and Wales. The SRN programme is split between public and privately funded elements and underpinned by the MNOs’ spectrum licence obligations. In line with the six-year capital funding period, the MNOs’ legally binding spectrum obligations for the SRN must be achieved by January 2027 and the programme will continue to deliver coverage improvements up to that point. Having achieved the overarching objectives of the SRN programme, government and the MNOs agreed a revised plan in July 2025 to target the remaining deployment of infrastructure in places where the benefits will be felt the most.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 increased to Green. This is primarily due to the programme having delivered its overarching objectives for coverage, premises and roads‚ a year ahead of schedule. The SRN Programme team has completed actions to implement the recommendations of the January 2025 Gateway 0 Review. These focused on refining the remaining delivery of the programme (given achievement of the overall objectives) to maximise effectiveness of the governance and value derived from the programme, improving communications to further align and strengthen stakeholder support, and ensuring the team's operating model is ready for the longer-term grant funding claims operation. The revised, targeted portfolio agreed with the MNOs in July 2025 is now in delivery alongside enhanced reporting requirements to monitor delivery progress effectively. BDUK has implemented a plan to support an increased volume of grant claims, which was informed by findings from a GIAA audit of the SRN programme’s grant management processes.","startDate":"2020-03-11","endDate":"2041-02-11","scheduleNarrative":"The Grant Agreement allocates funding up to and including FY 2040/41. The Transparency Notice was published on 11/03/2021, stating that SRN will start in February 2021 and is a 20-year programme. Publication of the Transparency Notice was delayed due to ongoing Brexit negotiations spilling over from 2020 to 2021. Funding could not be released until the Notice had been published and this in turn required changes to the Grant Agreement.","fyBaseline":94.44,"fyForecast":71.19,"fyVariance":24.62,"varianceNarrative":"Underspend in the 2025/26 budget has occurred due to reprofiling. This is the result of government working with the MNOs to revise the delivery plan in light of the SRN programme hitting its overall objectives over 12 months ahead of schedule. Underspend has also occurred due to slippage of MNO build activity into later financial years of the programme.","wholeLifeCost":328.19,"costNarrative":"The grant funding envelope was set by the HMT-approved business case in 2020 and continues to be sufficient to deliver the programme effectively. A reduction in the Whole Life Cost was made in 25/26 when the revised approach to the programme was agreed with the MNOs.","benefits":2128.05,"benefitsNarrative":"The benefits model was enhanced in late 2025 to improve accuracy, reflect new evidence and incorporate more granular data.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 increased to Green. This is primarily due to the programme having delivered its overarching objectives for coverage, premises and roads‚ a year ahead of schedule. The SRN Programme team has completed actions to implement the recommendations of the…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"DCMS_0020_2122-Q1","year":2025,"name":"Shared Rural Network","department":"DSIT","category":"Infrastructure and Construction","description":"The Shared Rural Network (SRN) programme is a deal between government and the four Mobile Network Operators (MNOs) - EE, Virgin Media O2, Vodafone and Three (with obligations flowing through to any subsequent merged entity). It has achieved its overarching objectives of delivering 4G coverage to 95% of UK landmass, 280,000 premises and 16,000km of roads over 12 months ahead of the programme deadline of the end of 2025, with the most significant coverage improvements in rural parts of Scotland and Wales. The SRN programme is split between public and privately funded elements and underpinned by the MNOs’ spectrum licence obligations. In line with the six-year capital funding period, the MNOs’ legally binding spectrum obligations for the SRN, which are still yet to be met, must be achieved by January 2027 and the programme will continue to deliver coverage improvements up to that point. Having achieved the overarching objectives of the SRN programme, government and the MNOs have worked together to agree a revised plan to target remaining deployment of infrastructure in places where the benefit will be felt the most.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The SRN Programme team is undertaking steps to act on the recommendations in the January 2025 Gateway 0 Review. These focused on refining the remaining delivery of the programme (given achievement of the overall objectives) to maximise effectiveness of the governance and value derived from the programme, improving communications to further align and strengthen stakeholder support, and ensuring the team's operating model is ready for the longer-term grant funding claims operation. Significant progress has been made in all areas: BDUK has agreed a revised, targeted delivery portfolio with the MNOs with improvements to the associated reporting requirements, Mova and BDUK own a joint communications strategy, and BDUK has a plan to support an increased volume of grant claims, which has also been informed by findings from a recent GIAA audit of the SRN programme’s grant management processes. Updates to the PAC recommendations were also published in March, confirming completion of cost assurance work, a refreshed benefits model, and improved access to management information to effectively monitor delivery progress.","startDate":"2020-03-11","endDate":"2040-03-11","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 11/03/2040. This is primarily due to the following factors‚ The Grant Agreement allocates funding up to and including FY 2040/41. The Transparency Notice was published on 11/03/2021, stating that SRN will start in February 2021 and is a 20-year programme. Publication of the Transparency Notice was delayed due to ongoing Brexit negotiations spilling over from 2020 to 2021. Funding could not be released until the Notice had been published and this in turn required changes to the Grant Agreement.","fyBaseline":95.4,"fyForecast":33.3,"fyVariance":65.09,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ Underspend in the current financial year has occurred due to reprofiling and slippage into later financial years of the programme. This is primarily the result of government working with the MNOs to revise the delivery plan in light of the SRN programme hitting its overall objectives over 12 months ahead of schedule.","wholeLifeCost":512.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 512. This is primarily due to the following factors‚ The grant funding envelope was set by the HMT-approved business case in 2020 and continues to be sufficient to deliver the programme effectively. A reduction in the Whole Life Cost can be expected for 25/26 when the revised approach to the programme that has been agreed with the MNOs, takes effect.","benefits":1351.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 1351. This is primarily due to the following factors‚ Benefits are accounted for in real prices (base year 2019/20) as they are adjusted for inflation over time. This is in line with the 2020 business case, which used real benefits (base year 2019/20).","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The SRN Programme team is undertaking steps to act on the recommendations in the January 2025 Gateway 0 Review. These focused on refining the remaining delivery of…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":-1,"transition":"Improved","endDateDeltaDays":337,"attentionScore":27,"attentionReasons":["Published end date moved 337 days later","In-year forecast variance is +24.6%"]},{"id":"DHSC_0066_2021-Q2","year":2026,"name":"NEW HOSPITAL PROGRAMME","department":"DHSC","category":"Infrastructure and Construction","description":"The New Hospital Programme was set up in October 2020 to deliver a combination of health, infrastructure and major programme capital delivery. The New Hospital Programme incorporated 46 hospital schemes, which includes the replacement of seven hospitals built wholly or mostly from Reinforced Autoclaved Aerated Concrete (RAAC).","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"As with financial year 24/25-Q4, NISTA’s Delivery Confidence Assessment rating at 25/26-Q4 remained at AMBER. This is primarily due to the following factors which have strengthened governance and assurance: working towards finalising a three-year Business Plan that will enable clearer spend decisions; strengthening capital delegations to allow higher value business case approvals e.g. for enabling works; strengthening governance and assurance; and prioritising recruitment to senior delivery team roles. The procurement of the Hospital 2.0 Alliance (H2A) was successfully completed, with the H2A Framework and Alliance Joining Agreements fully executed.","startDate":"2021-01-01","endDate":"2046-04-05","scheduleNarrative":"The programme end-date at 25/26-Q4 is 05/04/2046. The NHP continues to work closely with Trusts to progress their schemes in line with the timelines set out in the published Plan for Implementation. The latest agreed version of the Programme Business Case was fully approved in February 2025; the Hospital 2.0 standardised system is well advanced; and the Hospital 2.0 Alliance procurement has been concluded successfully. The hospitals that are being replaced due to being constructed wholly or mostly from Reinforced Autoclaved Aerated Concrete (RAAC) remain a programme priority.","fyBaseline":931.81,"fyForecast":708.06,"fyVariance":24.01,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The scheme budgets in the SR were established during the NHP review, we have seen some slippage during 2025/26 and are working to get spend back on track over the course of the Spending Review period","wholeLifeCost":47523.91,"costNarrative":"The project's departmentally agreed Whole Life Cost at 25/26-Q4 remained at the same level as 24/25. This is primarily due to the following factors Whole Life Costs do not include Pre-programme expenditure, or BAU running costs for each project. This will be assessed via individual business cases and funded over the lifetime of the asset. Whole Life Costs are now based on the latest agreed Programme Business Case, which was fully approved in February 2025, and covers 46 schemes for completion by 2045/46.","benefits":59407.0,"benefitsNarrative":"The project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained as per 24/25. This is primarily due to the following factors‚ This is now based on the latest agreed Programme Business Case, which was fully approved in February 2025. It includes efficiency benefits in nominal terms over 60 years post construction and inflates this by a rate of 2%. This considers cash releasing and non-cash releasing efficiency benefits, but not societal benefits as these are not counted as efficiencies.","themes":["Cost & funding","Governance & assurance","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"As with financial year 24/25-Q4, NISTA’s Delivery Confidence Assessment rating at 25/26-Q4 remained at AMBER. This is primarily due to the following factors which have strengthened governance and assurance: working towards finalising a three-year Business Plan that will enable clearer spend decisions; strengthening capital delegations to allow higher value…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"DHSC_0066_2021-Q2","year":2021,"name":"New Hospital Programme","department":"DHSC","category":"Infrastructure and Construction","description":"Through the delivery of 48 new NHS hospitals, The New Hospital Programme (NHP) aims to transform the delivery of national healthcare infrastructure across the NHS to provide world leading experiences for as many patients and staff as possible.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber/red.This is primarily due to the following factors: The feedback from the AAP review acknowledging the significant progress that the programme team have made to set this complex programme up properly with robust governance is very welcome, as is the recognition that the programme is still in the discovery phase. The Delivery Confidence Assessment of Amber, in line with the new 3 tier rating system, is one that I agree with, and I recognise that there is still much work to do. The next Gateway 0 Review this summer will be an opportunity to demonstrate further progress against the IPA's recommendations, including the latest work on the programme's delivery strategy and how the operating model will support it. It is pleasing to read that there are no urgent recommendations but an acceptance that the programme team are working through in order of priority the remaining recommendations from the gateway review and that the level of progress has been reviewed as appropriate","startDate":"2020-01-01","endDate":"2030-12-31","scheduleNarrative":"The project end-date is 31 December 2030. This is primarily due to the following factors: The Government announced the date in September 2019. There is no change to the scheduled project end date","fyBaseline":0.0,"fyForecast":749.48,"fyVariance":null,"varianceNarrative":"The GMPP project did not provide data","wholeLifeCost":0.0,"costNarrative":"The Government confirmed that 40 new hospitals will be built by 2030 and released �3.7bn of initial capital funding to support activity between April 2021 and March 2025. In addition, the Prime Minister announced an open competition for 8 further schemes to be built by 2030. We are still in discussion with HMT about whole life costs, as the programme does not yet have a confirmed funding envelope beyond 2025.","benefits":null,"benefitsNarrative":"","themes":["Delivery & schedule","Governance & assurance","Cost & funding","Technical & integration"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber/red.This is primarily due to the following factors: The feedback from the AAP review acknowledging the significant progress that the programme team have made to set this complex programme up properly with robust governance is very welcome, as is the recognition that the…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21"},{"id":"DHSC_0066_2021-Q2","year":2022,"name":"New Hospital Programme","department":"DHSC","category":"Infrastructure and Construction","description":"The Government confirmed that 40 new hospitals will be built by 2030 and released £3.7bn of initial capital funding to support activity between April 2021 and March 2025. This includes 8 previously announced schemes. In addition, the Prime Minister announced an open competition for 8 further schemes to be built by 2030. This will mean 48 hospitals delivered by the end of the decade.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 decreased from Red to Amber It is pleasing to read that a number of recommendations have been closed from the gateway review held in July 2021 and that the level of progress has been reviewed as appropriate","startDate":"2021-01-01","endDate":"2030-12-31","scheduleNarrative":"Early planning GMPP project (The project has not yet passed SOC, or its programme equivalent)","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Early planning GMPP project (The project has not yet passed SOC, or its programme equivalent)","wholeLifeCost":null,"costNarrative":"Early planning GMPP project (The project has not yet passed SOC, or its programme equivalent)","benefits":null,"benefitsNarrative":"","themes":["Delivery & schedule","Cost & funding","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 decreased from Red to Amber It is pleasing to read that a number of recommendations have been closed from the gateway review held in July 2021 and that the level of progress has been reviewed as appropriate Early planning GMPP…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"DHSC_0066_2021-Q2","year":2023,"name":"New Hospital Programme","department":"DHSC","category":"Infrastructure and Construction","description":"The Government confirmed that 40 new hospitals will be built by 2030 and released 3.7bn of initial capital funding to support activity between April 2021 and March 2025. This includes 8 previously announced schemes. In addition, the Prime Minister announced an open competition for 8 further schemes to be built by 2030. This will mean 48 hospitals delivered by the end of the decade","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Early planning GMPP project (The project has not yet passed SOC, or its programme equivalent)","startDate":null,"endDate":null,"scheduleNarrative":"Early planning GMPP project (The project has not yet passed SOC, or its programme equivalent)","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Early planning GMPP project (The project has not yet passed SOC, or its programme equivalent)","wholeLifeCost":null,"costNarrative":"Early planning GMPP project (The project has not yet passed SOC, or its programme equivalent)","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. The project did not provide departmental-agree monetised benefits at 22/23-Q4.The project did not provide departmental-agree monetised benefits at 22/23-Q4.The project did not provide departmental-agree monetised benefits at 22/23-Q4.","themes":[],"evidenceExcerpt":"Early planning GMPP project (The project has not yet passed SOC, or its programme equivalent) Early planning GMPP project (The project has not yet passed SOC, or its programme equivalent)","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"DHSC_0066_2021-Q2","year":2024,"name":"New Hospital Programme","department":"DHSC","category":"Infrastructure and Construction","description":"In May 2023, the Government confirmed that the New Hospital Programme was expected to be backed by over 20 billion of investment in hospital infrastructure to transform how critical national health infrastructure is delivered . This included a commitment to rebuilding five additional NHS hospitals constructed mostly using Reinforced Autoclaved Aerated Concrete and a future rolling programme of capital investment in hospital infrastructure to secure the building of new hospitals beyond 2030.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Red. This is primarily due to the following factors. The IPA PAR review was held in April 2024, prior to approval of the Programme Business Case, 5 recommendations were issued along with the red Rating. Despite the rating, NHP were supported in proceeding to MPRG, which was held on 30 April 2024, in recognition of the enormous effort from the programme team and the criticality of the programme and the need to maintain delivery momentum. This is a complex programme with a number of external pressures related to it. We recognise and are taking action to address concerns raised and engaging proactively both within the programme and across Government, the stakeholder landscape, supplier base, to identify, build in best practice and embed the broad support for this work. NHP have a further IPA review in July where the delivery confidence rating will be reassessed.","startDate":"2021-01-01","endDate":"2030-12-31","scheduleNarrative":"The project's end-date at 23/24-Q4 is 2030-12-31. This is primarily due to the following factors.","fyBaseline":870.0,"fyForecast":411.0,"fyVariance":-53.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The GMPP project did not provide narrative","wholeLifeCost":3690.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 23/24-Q4 is 3690m. This is primarily due to the following factors.","benefits":0.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 0m.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Red. This is primarily due to the following factors. The IPA PAR review was held in April 2024, prior to approval of the Programme Business Case, 5 recommendations were issued along with the red Rating. Despite the rating, NHP were supported in proceeding to MPRG,…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"DHSC_0066_2021-Q2","year":2025,"name":"NEW HOSPITAL PROGRAMME","department":"DHSC","category":"Infrastructure and Construction","description":"The New Hospital Programme was set up in October 2020 to deliver a combination of health, infrastructure and major programme capital delivery. The New Hospital Programme incorporated 46 hospital schemes, which includes the replacement of seven hospitals built wholly or mostly from Reinforced Autoclaved Aerated Concrete (RAAC).","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 has improved to AMBER. This is primarily due to the following factors‚ Following the New Hospital Programme (NHP) Review, we now have an agreed, realistic implementation plan, together with agreed changes to funding to the waves approach. NHP also appointed the Programme Delivery Partner (known as Health Delivery Partnership) on 1 April 2025.","startDate":"2021-01-01","endDate":"2046-04-05","scheduleNarrative":"The project's end-date at 24/25-Q4 is 05/04/2046. This is primarily due to the following factors‚ The New Hospital Programme (NHP) is currently reporting delivery as on-track against the schedule published in the Plan for Implementation. The latest agreed version of the Programme Business Case was fully approved in February 2025, the Hospital 2.0 standardised system is well advanced, and the Hospital 2.0 Alliance procurement is progressing well. The hospitals that are being replaced due to being constructed wholly or mostly from Reinforced Autoclaved Aerated Concrete (RAAC) remain a programme priority.","fyBaseline":1660.0,"fyForecast":762.0,"fyVariance":54.1,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The baseline for the financial year 24/25 was set as part of the last Spending Review (SR20). The SR20 budget was developed pre-NHP, before the programmatic approach and the development of Hospital 2.0 system. The programmatic approach allows most of the design activity to take place centrally, reducing the level of spend in the early years.","wholeLifeCost":60008.0,"costNarrative":"The project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) is 60,008. This is primarily due to the following factors Whole Life Costs do not include Pre-programme expenditure, or BAU running costs for each project. This will be assessed via individual business cases and funded over the lifetime of the asset. Whole Life Costs are now based on the latest agreed Programme Business Case, which was fully approved in February 2025, and covers 46 schemes for completion by 2045/46.","benefits":59000.0,"benefitsNarrative":"The project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) is 59,000. This is primarily due to the following factors‚ This is now based on the latest agreed Programme Business Case, which was fully approved in February 2025. It includes efficiency benefits in nominal terms over 60 years post construction and inflates this by a rate of 2%. This considers cash releasing and non-cash releasing efficiency benefits, but not societal benefits as these are not counted as efficiencies.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 has improved to AMBER. This is primarily due to the following factors‚ Following the New Hospital Programme (NHP) Review, we now have an agreed, realistic implementation plan, together with agreed changes to funding to the waves…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"DHSC_0066_2021-Q2","year":2026,"name":"NEW HOSPITAL PROGRAMME","department":"DHSC","category":"Infrastructure and Construction","description":"The New Hospital Programme was set up in October 2020 to deliver a combination of health, infrastructure and major programme capital delivery. The New Hospital Programme incorporated 46 hospital schemes, which includes the replacement of seven hospitals built wholly or mostly from Reinforced Autoclaved Aerated Concrete (RAAC).","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"As with financial year 24/25-Q4, NISTA’s Delivery Confidence Assessment rating at 25/26-Q4 remained at AMBER. This is primarily due to the following factors which have strengthened governance and assurance: working towards finalising a three-year Business Plan that will enable clearer spend decisions; strengthening capital delegations to allow higher value business case approvals e.g. for enabling works; strengthening governance and assurance; and prioritising recruitment to senior delivery team roles. The procurement of the Hospital 2.0 Alliance (H2A) was successfully completed, with the H2A Framework and Alliance Joining Agreements fully executed.","startDate":"2021-01-01","endDate":"2046-04-05","scheduleNarrative":"The programme end-date at 25/26-Q4 is 05/04/2046. The NHP continues to work closely with Trusts to progress their schemes in line with the timelines set out in the published Plan for Implementation. The latest agreed version of the Programme Business Case was fully approved in February 2025; the Hospital 2.0 standardised system is well advanced; and the Hospital 2.0 Alliance procurement has been concluded successfully. The hospitals that are being replaced due to being constructed wholly or mostly from Reinforced Autoclaved Aerated Concrete (RAAC) remain a programme priority.","fyBaseline":931.81,"fyForecast":708.06,"fyVariance":24.01,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The scheme budgets in the SR were established during the NHP review, we have seen some slippage during 2025/26 and are working to get spend back on track over the course of the Spending Review period","wholeLifeCost":47523.91,"costNarrative":"The project's departmentally agreed Whole Life Cost at 25/26-Q4 remained at the same level as 24/25. This is primarily due to the following factors Whole Life Costs do not include Pre-programme expenditure, or BAU running costs for each project. This will be assessed via individual business cases and funded over the lifetime of the asset. Whole Life Costs are now based on the latest agreed Programme Business Case, which was fully approved in February 2025, and covers 46 schemes for completion by 2045/46.","benefits":59407.0,"benefitsNarrative":"The project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained as per 24/25. This is primarily due to the following factors‚ This is now based on the latest agreed Programme Business Case, which was fully approved in February 2025. It includes efficiency benefits in nominal terms over 60 years post construction and inflates this by a rate of 2%. This considers cash releasing and non-cash releasing efficiency benefits, but not societal benefits as these are not counted as efficiencies.","themes":["Cost & funding","Governance & assurance","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"As with financial year 24/25-Q4, NISTA’s Delivery Confidence Assessment rating at 25/26-Q4 remained at AMBER. This is primarily due to the following factors which have strengthened governance and assurance: working towards finalising a three-year Business Plan that will enable clearer spend decisions; strengthening capital delegations to allow higher value…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"DHSC_0066_2021-Q2","year":2025,"name":"NEW HOSPITAL PROGRAMME","department":"DHSC","category":"Infrastructure and Construction","description":"The New Hospital Programme was set up in October 2020 to deliver a combination of health, infrastructure and major programme capital delivery. The New Hospital Programme incorporated 46 hospital schemes, which includes the replacement of seven hospitals built wholly or mostly from Reinforced Autoclaved Aerated Concrete (RAAC).","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 has improved to AMBER. This is primarily due to the following factors‚ Following the New Hospital Programme (NHP) Review, we now have an agreed, realistic implementation plan, together with agreed changes to funding to the waves approach. NHP also appointed the Programme Delivery Partner (known as Health Delivery Partnership) on 1 April 2025.","startDate":"2021-01-01","endDate":"2046-04-05","scheduleNarrative":"The project's end-date at 24/25-Q4 is 05/04/2046. This is primarily due to the following factors‚ The New Hospital Programme (NHP) is currently reporting delivery as on-track against the schedule published in the Plan for Implementation. The latest agreed version of the Programme Business Case was fully approved in February 2025, the Hospital 2.0 standardised system is well advanced, and the Hospital 2.0 Alliance procurement is progressing well. The hospitals that are being replaced due to being constructed wholly or mostly from Reinforced Autoclaved Aerated Concrete (RAAC) remain a programme priority.","fyBaseline":1660.0,"fyForecast":762.0,"fyVariance":54.1,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The baseline for the financial year 24/25 was set as part of the last Spending Review (SR20). The SR20 budget was developed pre-NHP, before the programmatic approach and the development of Hospital 2.0 system. The programmatic approach allows most of the design activity to take place centrally, reducing the level of spend in the early years.","wholeLifeCost":60008.0,"costNarrative":"The project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) is 60,008. This is primarily due to the following factors Whole Life Costs do not include Pre-programme expenditure, or BAU running costs for each project. This will be assessed via individual business cases and funded over the lifetime of the asset. Whole Life Costs are now based on the latest agreed Programme Business Case, which was fully approved in February 2025, and covers 46 schemes for completion by 2045/46.","benefits":59000.0,"benefitsNarrative":"The project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) is 59,000. This is primarily due to the following factors‚ This is now based on the latest agreed Programme Business Case, which was fully approved in February 2025. It includes efficiency benefits in nominal terms over 60 years post construction and inflates this by a rate of 2%. This considers cash releasing and non-cash releasing efficiency benefits, but not societal benefits as these are not counted as efficiencies.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 has improved to AMBER. This is primarily due to the following factors‚ Following the New Hospital Programme (NHP) Review, we now have an agreed, realistic implementation plan, together with agreed changes to funding to the waves…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":0,"attentionScore":26,"attentionReasons":["Current published delivery confidence is Amber","In-year forecast variance is +24.0%"]},{"id":"MOD_0007_2122-Q2","year":2026,"name":"SUBMERSIBLE SHIP NUCLEAR AUKUS","department":"MOD","category":"Military Capability","description":"SSN-AUKUS is a new class of nuclear-powered, conventionally armed attack submarine being developed in partnership with the US and Australia for the Royal Navy and Royal Australian Navy. The design and manufacturing process will be a complex, multi-decade undertaking, creating thousands of jobs across the UK. Construction of the UK’s submarines will take place principally at BAE Systems’ Barrow shipyard, with the manufacture of the next generation of nuclear reactors, including reactors for Australia’s SSN-AUKUS submarines, taking place at Rolls-Royce Submarines Ltd in Raynesway. SSN-AUKUS will enable deeper information and technology sharing and closer integration of security and defence-related science and technology, including propulsion plant systems, common vertical launch systems and conventional weapons from the US. They will be operational from the late 2030s, replacing the current SSN Astute Class.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors. 1. Rreflects the ongoing focus on enhancing supplier infrastructure to strengthen capability and capacity within the tier 1 and subordinate supply chain for SSN AUKUS. 2. Additionally, efforts continue to address the current shortfall in engineering resource to support the effective management and assurance of the submarine’s design.","startDate":"2014-04-01","endDate":"2043-04-30","scheduleNarrative":"Exempt under Section 24 - National security","fyBaseline":24.0,"fyForecast":24.0,"fyVariance":24.0,"varianceNarrative":"Exempt under Section 24 – National Security​","wholeLifeCost":null,"costNarrative":"Exempt under Section 35 - Formulation of government policy","benefits":null,"benefitsNarrative":"Compared to financial year 2024/25-Q4, the project's departmental-agreed monetised benefits at 2025/26-Q4 remained at £0m.","themes":["Workforce & capability","Commercial & supply chain","Governance & assurance","Cost & funding"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors. 1. Rreflects the ongoing focus on enhancing supplier infrastructure to strengthen capability and capacity within the tier 1 and subordinate supply chain for SSN AUKUS. 2. Additionally,…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"MOD_0007_2122-Q2","year":2023,"name":"Submersible Ship Nuclear AUKUS","department":"MOD","category":"Military Capability","description":"In March 2021 the UK Government committed to funding of this next generation of submarines, with the programme becoming known as Ship Submersible Nuclear (Replacement). The programmes aim is to deliver the next generation of Royal Navy submarines. The intial design work will inform a future decision to define the replacement for the Astute Class submarines - the nuclear-powered fleet of submarines currently in service with the Royal Navy.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 is Amber. This is primarily due to the following factors. Significant challenges at this early stage of the programme, some outside the control of the programme. Progress has been made, but negotiations with the suppliers have been more protracted than anticipated.","startDate":"2014-04-01","endDate":null,"scheduleNarrative":"The project's end-date at 22/23-Q4 is currently undefined. This is primarily due to the programme being in its Programme Definition Phase until 31/03/2023. Therefore, the programme's strategic milestones, detailed programme schedule and end-date are not possible to define.","fyBaseline":188.87,"fyForecast":179.81,"fyVariance":-5.0,"varianceNarrative":"The budget variance is less than or equal to 5%","wholeLifeCost":null,"costNarrative":"Exempt under Section 27 of the Freedom of Information Act 2000 (International Relations)","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This programme does not report cashable benefits. Its aim is to provision the armed forces with the equipment and / or infrastructure required.","themes":["Delivery & schedule","Cost & funding"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 is Amber. This is primarily due to the following factors. Significant challenges at this early stage of the programme, some outside the control of the programme. Progress has been made, but negotiations with the suppliers have been more protracted than anticipated. The…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"MOD_0007_2122-Q2","year":2024,"name":"Submersible Ship Nuclear AUKUS","department":"MOD","category":"Military Capability","description":"SSN-AUKUS is a new class of nuclear-powered, conventionally armed attack submarine being developed in partnership with the US and Australia for the Royal Navy and Royal Australian Navy. The design and manufacturing process will be a complex, multi-decade undertaking, creating thousands of jobs across the UK. SSN-AUKUS will enable deeper information and technology sharing and closer integration of security and defence-related science and technology, including propulsion plant systems, common vertical launch systems and conventional weapons from the US. They will be operational from the late 2030s, replacing the current SSN Astute Class.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. A degree of risk relating to the ability of the Defence Nuclear Enterprise and the wider UK supply chain to resource the programme with the necessary skills, experience and infrastructure to deliver against a demanding schedule, without adversely impacting the delivery of the Dreadnought (SSBN) programme.","startDate":"2014-04-01","endDate":null,"scheduleNarrative":"The SSN-AUKUS programme is in its early stages and is working to a schedule developed in conjunction with Industrial Partners.","fyBaseline":463.64,"fyForecast":494.67,"fyVariance":6.693,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. A result of unanticipated costs due to the insertion of US Technology. This opportunity arose as a result of the AUKUS agreement at the start of the financial year.","wholeLifeCost":null,"costNarrative":"Exempt under Section 27 of the Freedom of Information Act 2000 (International Relations)","benefits":0.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 0m.","themes":["Delivery & schedule","Cost & funding","Workforce & capability","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. A degree of risk relating to the ability of the Defence Nuclear Enterprise and the wider UK supply chain to resource the programme with the necessary skills, experience and…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"MOD_0007_2122-Q2","year":2025,"name":"SUBMERSIBLE SHIP NUCLEAR AUKUS","department":"MoD","category":"Military Capability","description":"SSN-AUKUS is a new class of nuclear-powered, conventionally armed attack submarine being developed in partnership with the US and Australia for the Royal Navy and Royal Australian Navy. The design and manufacturing process will be a complex, multi-decade undertaking, creating thousands of jobs across the UK. Construction of the UK’s submarines will take place principally at BAE Systems’ Barrow shipyard, with the manufacture of the next generation of nuclear reactors, including reactors for Australia’s SSN-AUKUS submarines, taking place at Rolls-Royce Submarines Ltd in Raynesway. SSN-AUKUS will enable deeper information and technology sharing and closer integration of security and defence-related science and technology, including propulsion plant systems, common vertical launch systems and conventional weapons from the US. They will be operational from the late 2030s, replacing the current SSN Astute Class.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER, compared with the project's assessment last year of AMBER. This is due to the following factors. SSN AUKUS has a critical dependency on supplier infrastructure, which needs to be enhanced, to deliver capability and capacity within the tier 1 and subordinate supply chain. In addition, there continues to be a shortfall of engineering resource to progress the overall management and assurance of the submarine’s design.","startDate":"2014-04-01","endDate":null,"scheduleNarrative":"Section 24 - National security, Section 26 - Defence","fyBaseline":614.88,"fyForecast":447.83,"fyVariance":27.17,"varianceNarrative":"Section 24 - National security, Section 26 - Defence","wholeLifeCost":null,"costNarrative":"Section 35 - Formulation of government policy","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits","themes":["Workforce & capability","Commercial & supply chain","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER, compared with the project's assessment last year of AMBER. This is due to the following factors. SSN AUKUS has a critical dependency on supplier infrastructure, which needs to be enhanced, to deliver capability and capacity within the tier 1 and subordinate…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"MOD_0007_2122-Q2","year":2026,"name":"SUBMERSIBLE SHIP NUCLEAR AUKUS","department":"MOD","category":"Military Capability","description":"SSN-AUKUS is a new class of nuclear-powered, conventionally armed attack submarine being developed in partnership with the US and Australia for the Royal Navy and Royal Australian Navy. The design and manufacturing process will be a complex, multi-decade undertaking, creating thousands of jobs across the UK. Construction of the UK’s submarines will take place principally at BAE Systems’ Barrow shipyard, with the manufacture of the next generation of nuclear reactors, including reactors for Australia’s SSN-AUKUS submarines, taking place at Rolls-Royce Submarines Ltd in Raynesway. SSN-AUKUS will enable deeper information and technology sharing and closer integration of security and defence-related science and technology, including propulsion plant systems, common vertical launch systems and conventional weapons from the US. They will be operational from the late 2030s, replacing the current SSN Astute Class.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors. 1. Rreflects the ongoing focus on enhancing supplier infrastructure to strengthen capability and capacity within the tier 1 and subordinate supply chain for SSN AUKUS. 2. Additionally, efforts continue to address the current shortfall in engineering resource to support the effective management and assurance of the submarine’s design.","startDate":"2014-04-01","endDate":"2043-04-30","scheduleNarrative":"Exempt under Section 24 - National security","fyBaseline":24.0,"fyForecast":24.0,"fyVariance":24.0,"varianceNarrative":"Exempt under Section 24 – National Security​","wholeLifeCost":null,"costNarrative":"Exempt under Section 35 - Formulation of government policy","benefits":null,"benefitsNarrative":"Compared to financial year 2024/25-Q4, the project's departmental-agreed monetised benefits at 2025/26-Q4 remained at £0m.","themes":["Workforce & capability","Commercial & supply chain","Governance & assurance","Cost & funding"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors. 1. Rreflects the ongoing focus on enhancing supplier infrastructure to strengthen capability and capacity within the tier 1 and subordinate supply chain for SSN AUKUS. 2. Additionally,…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"MOD_0007_2122-Q2","year":2025,"name":"SUBMERSIBLE SHIP NUCLEAR AUKUS","department":"MoD","category":"Military Capability","description":"SSN-AUKUS is a new class of nuclear-powered, conventionally armed attack submarine being developed in partnership with the US and Australia for the Royal Navy and Royal Australian Navy. The design and manufacturing process will be a complex, multi-decade undertaking, creating thousands of jobs across the UK. Construction of the UK’s submarines will take place principally at BAE Systems’ Barrow shipyard, with the manufacture of the next generation of nuclear reactors, including reactors for Australia’s SSN-AUKUS submarines, taking place at Rolls-Royce Submarines Ltd in Raynesway. SSN-AUKUS will enable deeper information and technology sharing and closer integration of security and defence-related science and technology, including propulsion plant systems, common vertical launch systems and conventional weapons from the US. They will be operational from the late 2030s, replacing the current SSN Astute Class.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER, compared with the project's assessment last year of AMBER. This is due to the following factors. SSN AUKUS has a critical dependency on supplier infrastructure, which needs to be enhanced, to deliver capability and capacity within the tier 1 and subordinate supply chain. In addition, there continues to be a shortfall of engineering resource to progress the overall management and assurance of the submarine’s design.","startDate":"2014-04-01","endDate":null,"scheduleNarrative":"Section 24 - National security, Section 26 - Defence","fyBaseline":614.88,"fyForecast":447.83,"fyVariance":27.17,"varianceNarrative":"Section 24 - National security, Section 26 - Defence","wholeLifeCost":null,"costNarrative":"Section 35 - Formulation of government policy","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits","themes":["Workforce & capability","Commercial & supply chain","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER, compared with the project's assessment last year of AMBER. This is due to the following factors. SSN AUKUS has a critical dependency on supplier infrastructure, which needs to be enhanced, to deliver capability and capacity within the tier 1 and subordinate…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":null,"attentionScore":26,"attentionReasons":["Current published delivery confidence is Amber","In-year forecast variance is +24.0%"]},{"id":"MOD_0009_2122-Q2","year":2026,"name":"CHINOOK CAPABILITY SUSTAINMENT PROGRAMME (CSP)","department":"MOD","category":"Military Capability","description":"Chinook Capability Sustainment Programme Tranche 1 will provide a modern and cost effective transformational change to the UK Special User's vertical heavy lift capability with the procurement of 14 new-build Extended Range Chinook aircraft (H-47(ER)). The aircraft will be able to operate and survive in a multitude of environments, conducting high-tempo missions with minimal logistics footprint and high-levels of interoperability with key allies, to beyond 2050.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors. 1. Continued uncertainty around actual infrastructure cost and schedule (mitigations underway to deliver programme milestones without supporting infrastructure), ability to develop required information solutions that are affordable and deliverable on schedule and, workforce shortages in key areas. 2. Value engineering is underway to ensure the programme remains affordable.","startDate":"2017-03-31","endDate":"2030-10-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 31/12/2030. This is contingent on mitigations around delivering training ahead of infrastructure delivery.","fyBaseline":300.45,"fyForecast":239.62,"fyVariance":20.24,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. 1. The budget variance is driven by delays in infrastructure and information systems contracting, maturing costs associated with production and GBP/USD forex rate changes.","wholeLifeCost":1959.31,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) increased from £1913.51M to £1948.89M. This is primarily due to the following factors. 1. The Whole Life Cost forecast is subject to further review due to Infrastructure cost growth - the scale of which is yet to be determined. 2. There is similar uncertainty around information systems cost and deliverability that are currently being assessed.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors. 1. Continued uncertainty around actual infrastructure cost and schedule (mitigations underway to deliver programme milestones without supporting infrastructure), ability to develop…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"MOD_0009_2122-Q2","year":2022,"name":"CHINOOK CAPABILITY SUSTAINMENT PROGRAMME (CSP)","department":"MOD","category":"Military Capability","description":"Chinook Capability Sustainment Programme will provide a modern, cost-effective, Vertical Heavy Lift helicopter fleet that will be able to operate and survive in a multitude of environments, conducting high-tempo missions with minimal logistics footprint and high-levels of interoperability with key allies, to beyond 2050. Tranche 1 of the Programme delivers a transformational capability through the procurement of 14 new-build Chinook aircraft.","ipaDca":"Green","sroDca":null,"deliveryConfidence":"Green","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure and Project Authority's Delivery Confidence Assessment rating at 21/22 Q4 is Green. This is primarily due to the following factors: Although a recent entry onto the Government major Projects portfolio successful delivery appears highly likely ans there are no major outstanding issues that at this stage appear to threaten delivery.","startDate":"2017-03-31","endDate":"2030-12-31","scheduleNarrative":"The project end-date is 31 December 2030. This is primarily due to the following factors: The Programme's strategic capability milestones will be formalised once the full analysis of the 'Bring Forward' direction from Ministers is complete. This effectively re-baselines the Programme.","fyBaseline":30.43,"fyForecast":103.9,"fyVariance":243.0,"varianceNarrative":"The budget variance exceeds 5%. The current forecast overspend variance is as a result of the bring forward of Long Lead Time item and the confirmation of requirements against the existing agreements. This action is expected to reduce cost growth in later years.","wholeLifeCost":1519.0,"costNarrative":"The Baseline Whole Life Cost is 1518.78 (£m). This is primarily due to the following factors: The project departmental-agreed Whole Life Cost at 21/22-Q4 is £2,154M until the Chinook Capability Sustainment Programme out-of-service date of 2050. This figure includes £1518.781M captured as the programme's 10 year provision that includes initial aircraft procurement and initial support equipment.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Workforce & capability","Commercial & supply chain"],"evidenceExcerpt":"The Infrastructure and Project Authority's Delivery Confidence Assessment rating at 21/22 Q4 is Green. This is primarily due to the following factors: Although a recent entry onto the Government major Projects portfolio successful delivery appears highly likely ans there are no major outstanding issues that at this stage appear to threaten delivery. The…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"MOD_0009_2122-Q2","year":2023,"name":"CHINOOK CAPABILITY SUSTAINMENT PROGRAMME (CSP)","department":"MOD","category":"Military Capability","description":"Chinook Capability Sustainment Programme Tranche 1 will provide a modern and cost effective transformational change to the UK Special User's vertical heavy lift capability with the procurement of 14 new-build Chinook aircraft. The aircraft will be able to operate and survive in a multitude of environments, conducting high-tempo missions with minimal logistics footprint and high-levels of interoperability with key allies, to beyond 2050.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 decreased from Green (IPA rating) to Amber (SRO rating). This is primarily due to the following factors. Inflationary pressures and supply chain delays will increase affordability risk and programme success relies heavily on the release of capability information from the US to the UK. The Programme is currently working through rescheduling activities with the US Department of Defence which will culminate in a revised schedule and financial profile. The lack of key skills and experience, though mitigated by the arrival of a new Programme Director, Programme Manager and five Programme Control contractors, remains a risk given the high degree of churn.","startDate":"2017-03-31","endDate":"2030-12-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2030-12-31. This is primarily due to the following factors. NA","fyBaseline":85.35,"fyForecast":56.51,"fyVariance":-34.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors: The Programme has not been able to commit funds at the rate anticipated as a consequence of US Government's delay in placing contracts due to resourcing challenges.","wholeLifeCost":1602.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 increased from 1519m. to 1602m. This is primarily due to the following factors. The cost growth due to a net 18 month deferral. The programme will re-baseline when the full implications are confirmed.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This programme does not report cashable benefits. Its aim is to provision the armed forces with the equipment and / or infrastructure required.","themes":["Cost & funding","Delivery & schedule","Workforce & capability","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 decreased from Green (IPA rating) to Amber (SRO rating). This is primarily due to the following factors. Inflationary pressures and supply chain delays will increase affordability risk and programme success relies heavily on the release of capability information from…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"MOD_0009_2122-Q2","year":2024,"name":"CHINOOK CAPABILITY SUSTAINMENT PROGRAMME (CSP)","department":"MOD","category":"Military Capability","description":"Chinook Capability Sustainment Programme Tranche 1 will provide a modern and cost effective transformational change to the UK Special User's vertical heavy lift capability with the procurement of 14 new-build Extended Range Chinook aircraft (H-47(ER)). The aircraft will be able to operate and survive in a multitude of environments, conducting high-tempo missions with minimal logistics footprint and high-levels of interoperability with key allies, to beyond 2050.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors, recorded in the Infrastructure and Projects Authority Gateway 0/3 Review. Aircraft certification risk (information sharing between the US and the UK) and workforce capability shortfalls. Despite the increased costs to the programme following the 3-year deferral, the programme remains affordable, subject to HM Treasury approval.","startDate":"2017-03-31","endDate":"2030-12-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2030-12-31. This is primarily due to the following factors. A recent Scheduled Risk Analysis was conducted by the Delivery Team, which subsequently formed the basis of the Review Note submitted to the Investments Approvals Committee to re-baseline the programme following the 3-year deferral. Targeted efforts to reconcile programme schedules, assumptions and risks into a programme-wide integrated Master Schedule are due to be completed in April 2024.","fyBaseline":148.56,"fyForecast":145.97,"fyVariance":-1.743,"varianceNarrative":"The budget variance is less than or equal to 5%","wholeLifeCost":1861.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 increased from 1602m to 1861m. This is primarily due to the following factors. The UK decision in 2021 to defer H-47(ER) aircraft production by 3 years, compounded by adverse inflation and Forex cost increases, resulted in significant cost growth. However, negotiations with the US Government and other measures taken since June 2023 have reduced the growth to an affordable level without reducing the scope of the Programme or impacting capability.","benefits":0.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 0m.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors, recorded in the Infrastructure and Projects Authority Gateway 0/3 Review. Aircraft certification risk (information sharing between the US and the UK) and workforce…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"MOD_0009_2122-Q2","year":2025,"name":"CHINOOK CAPABILITY SUSTAINMENT PROGRAMME (CSP)","department":"MoD","category":"Military Capability","description":"Chinook Capability Sustainment Programme Tranche 1 will provide a modern and cost effective transformational change to the UK Special User's vertical heavy lift capability with the procurement of 14 new-build Extended Range Chinook aircraft (H-47(ER)). The aircraft will be able to operate and survive in a multitude of environments, conducting high-tempo missions with minimal logistics footprint and high-levels of interoperability with key allies, to beyond 2050.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. Aircraft certification risk (information sharing between the US and the UK); workforce capability shortfalls.","startDate":"2017-03-31","endDate":"2030-12-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/12/2030.","fyBaseline":314.44,"fyForecast":274.75,"fyVariance":12.62,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The in year underspend is due to the delay to Letter of Offer and Acceptance signature and knock on impact to the placing of US Government contracts. This will be re-profiled in Public Contract Regulations (PCR) 25.","wholeLifeCost":1913.51,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 1861 to 1913. This is primarily due to the following factors. The UK's decision in 2021 to defer H-47(ER) aircraft production by 3 years, compounded by adverse inflation and Forex cost increases which has resulted in significant cost growth. However, negotiations with the US Government and other measures taken since June 2023 have reduced the growth to an affordable level without reducing the scope of the Programme or impacting capability.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Workforce & capability","Commercial & supply chain","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. Aircraft certification risk (information sharing between the US and the UK); workforce capability shortfalls. Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"MOD_0009_2122-Q2","year":2026,"name":"CHINOOK CAPABILITY SUSTAINMENT PROGRAMME (CSP)","department":"MOD","category":"Military Capability","description":"Chinook Capability Sustainment Programme Tranche 1 will provide a modern and cost effective transformational change to the UK Special User's vertical heavy lift capability with the procurement of 14 new-build Extended Range Chinook aircraft (H-47(ER)). The aircraft will be able to operate and survive in a multitude of environments, conducting high-tempo missions with minimal logistics footprint and high-levels of interoperability with key allies, to beyond 2050.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors. 1. Continued uncertainty around actual infrastructure cost and schedule (mitigations underway to deliver programme milestones without supporting infrastructure), ability to develop required information solutions that are affordable and deliverable on schedule and, workforce shortages in key areas. 2. Value engineering is underway to ensure the programme remains affordable.","startDate":"2017-03-31","endDate":"2030-10-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 31/12/2030. This is contingent on mitigations around delivering training ahead of infrastructure delivery.","fyBaseline":300.45,"fyForecast":239.62,"fyVariance":20.24,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. 1. The budget variance is driven by delays in infrastructure and information systems contracting, maturing costs associated with production and GBP/USD forex rate changes.","wholeLifeCost":1959.31,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) increased from £1913.51M to £1948.89M. This is primarily due to the following factors. 1. The Whole Life Cost forecast is subject to further review due to Infrastructure cost growth - the scale of which is yet to be determined. 2. There is similar uncertainty around information systems cost and deliverability that are currently being assessed.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors. 1. Continued uncertainty around actual infrastructure cost and schedule (mitigations underway to deliver programme milestones without supporting infrastructure), ability to develop…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"MOD_0009_2122-Q2","year":2025,"name":"CHINOOK CAPABILITY SUSTAINMENT PROGRAMME (CSP)","department":"MoD","category":"Military Capability","description":"Chinook Capability Sustainment Programme Tranche 1 will provide a modern and cost effective transformational change to the UK Special User's vertical heavy lift capability with the procurement of 14 new-build Extended Range Chinook aircraft (H-47(ER)). The aircraft will be able to operate and survive in a multitude of environments, conducting high-tempo missions with minimal logistics footprint and high-levels of interoperability with key allies, to beyond 2050.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. Aircraft certification risk (information sharing between the US and the UK); workforce capability shortfalls.","startDate":"2017-03-31","endDate":"2030-12-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/12/2030.","fyBaseline":314.44,"fyForecast":274.75,"fyVariance":12.62,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The in year underspend is due to the delay to Letter of Offer and Acceptance signature and knock on impact to the placing of US Government contracts. This will be re-profiled in Public Contract Regulations (PCR) 25.","wholeLifeCost":1913.51,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 1861 to 1913. This is primarily due to the following factors. The UK's decision in 2021 to defer H-47(ER) aircraft production by 3 years, compounded by adverse inflation and Forex cost increases which has resulted in significant cost growth. However, negotiations with the US Government and other measures taken since June 2023 have reduced the growth to an affordable level without reducing the scope of the Programme or impacting capability.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Workforce & capability","Commercial & supply chain","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. Aircraft certification risk (information sharing between the US and the UK); workforce capability shortfalls. Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":-61,"attentionScore":25,"attentionReasons":["Current published delivery confidence is Amber","In-year forecast variance is +20.2%"]},{"id":"HMRC_0292_2324-Q3","year":2026,"name":"ENTERPRISE TAX MANAGEMENT PLATFORM (ETMP)","department":"HMRC","category":"Government Transformation and Service Delivery","description":"Enterprise Tax Management Platform Regeneration is a multi-year programme, established to modernise and protect the backbone of the HMRC tax accounting and payment capability. It will exploit new technology to enable better performance, improved user experience and innovation of our business processes to reduce cost and increase compliance revenue.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Programme Delivery Confidence Assessment remains Amber, with an improving trajectory and outlook as the Programme's commercial strategy implementation reaches conclusion. In December 25, the Programme awarded a contract to SAP for the provision of Enterprise Tax Management Platform (ETMP) software for the next 10-15 years and the Programme remains on track to appoint a Migration Delivery Partner in May 26. Migration enablement risk remains, centring around transforming the ETMP Application Programme Interface (API) landscape, how the applications interact with each other and reducing the size of the current platform. A Benefits Realisation plan alongside a business change strategy for the programme is maturing alongside identification of opportunities to reduce the delivery costs and will be presented in the next iteration of the Programme Business Case.","startDate":"2022-07-29","endDate":"2030-05-31","scheduleNarrative":"Compared to financial year 24/25-Q4 the project's end date at 25/26 has increased to 31/05/2030 due to delivery of 12 months Hypercare which is a period of heightened support following go-live.","fyBaseline":22.47,"fyForecast":19.64,"fyVariance":12.61,"varianceNarrative":"The GMPP Q4 and Annual Report are not directly comparable because they use different reference points (Baseline, Forecast, and Budget). Using the Business Case baseline (£22.6m) shows a larger variance, while using the actual budget (£21m) reduces the variance to under 5%.","wholeLifeCost":480.87,"costNarrative":"Compared to the 2024/25 financial year, the departmentally agreed Whole Life Costs range, approved by TAP (Treasury Approval Point) in November 2025, is £453m - £537m. The increase in costs is primarily driven by an increase in SAP contract duration (from 8-10 years) and a more mature understanding of the scope being delivered across SAP, HMRC and the future Migration Delivery Partner.","benefits":42.09,"benefitsNarrative":"The previous version of Programme Business Case, approved in May 2024, was based upon an 8-year contract duration, projected whole life costs of £444m. We are reporting benefits of £47m but anticipate these will increase over time to £116m. The key benefit of this Programme is protecting this vital piece of critical national infrastructure which secures over £800bn of tax per year of tax.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"The Programme Delivery Confidence Assessment remains Amber, with an improving trajectory and outlook as the Programme's commercial strategy implementation reaches conclusion. In December 25, the Programme awarded a contract to SAP for the provision of Enterprise Tax Management Platform (ETMP) software for the next 10-15 years and the Programme remains on…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"HMRC_0292_2324-Q3","year":2024,"name":"Enterprise Tax Management Platform (ETMP)","department":"HMRC","category":"Government Transformation and Service Delivery","description":"The Enterprise Tax Management Platform (ETMP) Regeneration is a multi-year programme, established to lead HMRC's response to the announced end of mainstream support for the software product that underpins ETMP It's secondary objective is to address key challenges identified with the current platform. The programme will modernise and protect ETMP, the backbone of the HMRC tax accounting and payment capability. It will exploit new technology to enable better performance, improved user experience and innovation of our business processes to reduce cost and increase compliance and revenue._x000D_ The programme will regenerate ETMP, focusing on how the platform can deliver better business value through migration to a modern software product in the long term and through continuous improvement to the functionality of the current platform in the short term.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. The Amber status is due to the programme not yet having decided on the preferred option for delivery and wider understanding of the migration approach. Alongside this there are capability, capacity and whole cost funding concerns. These concerns are being explored through the department's business planning process for 2024/25. In the meantime, regeneration activity for ETMP has delivered for 2023/24 with plans in place to continue during 2024/25.","startDate":"2022-07-29","endDate":"2030-03-31","scheduleNarrative":"The project's end-date at 23/24-Q4 is 2030-03-31. This is primarily due to the following factors. The programme is made up of two elements, addressing the key concerns with the current platform and to determine the preferred option for delivery, as the current provider is ending mainstream support in 2027. Discussion around the preferred option for delivery continue and the outcome will be included in revised plans and it is expected that the programme will complete by 31st March 2030.","fyBaseline":12.51,"fyForecast":10.47,"fyVariance":-16.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The variance is due to the underspend in budget driven partly by uncertainties during the year on the strategic approach and supplier capacity issues that restricted the work that could be carried out.","wholeLifeCost":290.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 23/24-Q4 is 290m. This is primarily due to the following factors. The whole lifecycle costs are made of programme development (Information Technology (IT)) costs. Programme paybill and overhead costs for the period 2022/23 to 2029/30.","benefits":55.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 55m. Whilst potential benefits have been identified for migration, until the preferred option for delivery has been ascertained, these have yet to be quantified. Priority project benefits identified for 2024/25 are in the process of being ratified.","themes":["Cost & funding","Delivery & schedule","Workforce & capability","Technical & integration"],"evidenceExcerpt":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. The Amber status is due to the programme not yet having decided on the preferred option for delivery and wider understanding of the migration approach. Alongside this there are capability, capacity and whole cost funding…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"HMRC_0292_2324-Q3","year":2025,"name":"ENTERPRISE TAX MANAGEMENT PLATFORM (ETMP)","department":"HMRC","category":"Government Transformation and Service Delivery","description":"The Enterprise Tax Management Platform (ETMP) Regeneration is a multi-year programme, established to modernise and protect the backbone of the HMRC tax accounting and payment capability. It will exploit new technology to enable better performance, improved user experience and innovation of our business processes to reduce cost and increase compliance and revenue.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors; This is primarily due to the Low-medium maturity of the integrated Programme schedule, to demonstrate confidence of achieving a safe and technically compliant transition to new capabilities by the end of the extended support period (include date). The high complexity and low-medium maturity of the Programme delivery and procurement strategy which will require a multi-vendor approach and niche subject matter expertise in both client side and delivery partner capability. There are also multiple high risk areas centring around the technical enablement and migration, with an improving trajectory and medium maturity of pipeline projects to improve the current service during 25/26. These factors combined give an SRO confidence assessment of Amber.","startDate":"2022-07-29","endDate":"2030-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained the same at 31/03/2030. The programme's end-date remains at 24/25-Q4, 31 March 2030.","fyBaseline":10.0,"fyForecast":9.28,"fyVariance":7.2,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The variance is partly due to delays to approving the Procurement strategy which was impacted by the pre election period and change in Government after the General Election in July 24 combined with and lower than expected supplier costs.","wholeLifeCost":443.9,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 290 to 443.9. This is primarily due to the following factors‚ The previous version of this document estimated whole life costs of £290m for migration for the preferred option. Since then, further work has been carried out to review assumptions and delivery costs in partnership with SAP and Deloitte, which has seen the WLC increase to £443.9m.","benefits":21.18,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) decreased from 55 to 21. This is primarily due to the following factors‚ Our understanding of potential benefits is still maturing and working with business owners and SAP we have started to set out an outline of expected benefits using benchmarked improvements from SAP created using an analysis of other organisations that have migrated to the new platform.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Technical & integration"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors; This is primarily due to the Low-medium maturity of the integrated Programme schedule, to demonstrate confidence of achieving a safe and technically compliant…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"HMRC_0292_2324-Q3","year":2026,"name":"ENTERPRISE TAX MANAGEMENT PLATFORM (ETMP)","department":"HMRC","category":"Government Transformation and Service Delivery","description":"Enterprise Tax Management Platform Regeneration is a multi-year programme, established to modernise and protect the backbone of the HMRC tax accounting and payment capability. It will exploit new technology to enable better performance, improved user experience and innovation of our business processes to reduce cost and increase compliance revenue.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Programme Delivery Confidence Assessment remains Amber, with an improving trajectory and outlook as the Programme's commercial strategy implementation reaches conclusion. In December 25, the Programme awarded a contract to SAP for the provision of Enterprise Tax Management Platform (ETMP) software for the next 10-15 years and the Programme remains on track to appoint a Migration Delivery Partner in May 26. Migration enablement risk remains, centring around transforming the ETMP Application Programme Interface (API) landscape, how the applications interact with each other and reducing the size of the current platform. A Benefits Realisation plan alongside a business change strategy for the programme is maturing alongside identification of opportunities to reduce the delivery costs and will be presented in the next iteration of the Programme Business Case.","startDate":"2022-07-29","endDate":"2030-05-31","scheduleNarrative":"Compared to financial year 24/25-Q4 the project's end date at 25/26 has increased to 31/05/2030 due to delivery of 12 months Hypercare which is a period of heightened support following go-live.","fyBaseline":22.47,"fyForecast":19.64,"fyVariance":12.61,"varianceNarrative":"The GMPP Q4 and Annual Report are not directly comparable because they use different reference points (Baseline, Forecast, and Budget). Using the Business Case baseline (£22.6m) shows a larger variance, while using the actual budget (£21m) reduces the variance to under 5%.","wholeLifeCost":480.87,"costNarrative":"Compared to the 2024/25 financial year, the departmentally agreed Whole Life Costs range, approved by TAP (Treasury Approval Point) in November 2025, is £453m - £537m. The increase in costs is primarily driven by an increase in SAP contract duration (from 8-10 years) and a more mature understanding of the scope being delivered across SAP, HMRC and the future Migration Delivery Partner.","benefits":42.09,"benefitsNarrative":"The previous version of Programme Business Case, approved in May 2024, was based upon an 8-year contract duration, projected whole life costs of £444m. We are reporting benefits of £47m but anticipate these will increase over time to £116m. The key benefit of this Programme is protecting this vital piece of critical national infrastructure which secures over £800bn of tax per year of tax.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"The Programme Delivery Confidence Assessment remains Amber, with an improving trajectory and outlook as the Programme's commercial strategy implementation reaches conclusion. In December 25, the Programme awarded a contract to SAP for the provision of Enterprise Tax Management Platform (ETMP) software for the next 10-15 years and the Programme remains on…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"HMRC_0292_2324-Q3","year":2025,"name":"ENTERPRISE TAX MANAGEMENT PLATFORM (ETMP)","department":"HMRC","category":"Government Transformation and Service Delivery","description":"The Enterprise Tax Management Platform (ETMP) Regeneration is a multi-year programme, established to modernise and protect the backbone of the HMRC tax accounting and payment capability. It will exploit new technology to enable better performance, improved user experience and innovation of our business processes to reduce cost and increase compliance and revenue.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors; This is primarily due to the Low-medium maturity of the integrated Programme schedule, to demonstrate confidence of achieving a safe and technically compliant transition to new capabilities by the end of the extended support period (include date). The high complexity and low-medium maturity of the Programme delivery and procurement strategy which will require a multi-vendor approach and niche subject matter expertise in both client side and delivery partner capability. There are also multiple high risk areas centring around the technical enablement and migration, with an improving trajectory and medium maturity of pipeline projects to improve the current service during 25/26. These factors combined give an SRO confidence assessment of Amber.","startDate":"2022-07-29","endDate":"2030-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained the same at 31/03/2030. The programme's end-date remains at 24/25-Q4, 31 March 2030.","fyBaseline":10.0,"fyForecast":9.28,"fyVariance":7.2,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The variance is partly due to delays to approving the Procurement strategy which was impacted by the pre election period and change in Government after the General Election in July 24 combined with and lower than expected supplier costs.","wholeLifeCost":443.9,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 290 to 443.9. This is primarily due to the following factors‚ The previous version of this document estimated whole life costs of £290m for migration for the preferred option. Since then, further work has been carried out to review assumptions and delivery costs in partnership with SAP and Deloitte, which has seen the WLC increase to £443.9m.","benefits":21.18,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) decreased from 55 to 21. This is primarily due to the following factors‚ Our understanding of potential benefits is still maturing and working with business owners and SAP we have started to set out an outline of expected benefits using benchmarked improvements from SAP created using an analysis of other organisations that have migrated to the new platform.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Technical & integration"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors; This is primarily due to the Low-medium maturity of the integrated Programme schedule, to demonstrate confidence of achieving a safe and technically compliant…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":61,"attentionScore":25,"attentionReasons":["Current published delivery confidence is Amber","Published end date moved 61 days later","In-year forecast variance is +12.6%"]},{"id":"DESNZ_0472_2425-Q4","year":2026,"name":"Great British Energy","department":"DESNZ","category":"Infrastructure and Construction","description":"The aim of the GBE set up programme is to create GBE GovCo, a publicly owned energy company that will drive the deployment of clean energy, enhance energy independence, and create jobs across the UK. This aim will deliver on the Government’s Mission to establish GBE as the mechanism for delivery of the key outcomes of the GBE Programme as set out in the Labour Party 2024 UK General Election manifesto. Namely, ability to strategically invest in and own clean energy projects, foster collaboration with key stakeholders, and support local and community energy initiatives. The desired outcome of this programme is the creation of a fully functioning, independent and publicly owned energy company called Great British Energy (GBE).","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This reflects significant progress made in establishing the organisational, governance and delivery frameworks required for GBE to move towards operational independence and the closure of the set-up programme. The Programme has received CST approval for the ALB set-up Full Business Case, enabling both DESNZ and GBE to proceed with FY26/27 set-up spend. On 4 March, the programme received the Subsidy Advice Unit’s (SAU) final referral report on the Subsidy Control Assessment for GBE’s 2026–2029 activity. The SAU provided a favourable assessment, confirming that the policy objective, the rationale for using a subsidy, and the necessity of the scheme have been clearly articulated. The Aberdeen HQ remains on track to open later in 2026, and recruitment is progressing across all levels following approval of their workforce and senior pay case, and an interim leadership team in place. The first tranche of the permanent Non-Executive Director (NED) appointments is underway. GBE has made significant progress with senior recruitment, with a Local Managing Director (MD) identified and a Strategy Director appointed. Interviews for an onshore and offshore wind MD took place in May. GBE has also agreed its workforce pay case and launched a significant recruitment campaign to stabilise its workforce and increase its presence in Aberdeen. This has been supported by a recruitment event held in Aberdeen on 3 June. Across the programme, GBE has made its first supply chain investment - a £40 million equity investment in ITM Power. It has also published the Local Power Plan together with DESNZ, setting out a clear vision to transform the UK’s local and community energy sector, and made its first investment in 100MW Pentland Offshore Wind Farm alongside the National Wealth Fund and Scottish National Investment Bank. Although the programme delivery confidence assessment remains Amber, risks continue to be actively managed. The programme remains on track to implement the Sponsorship Assurance Framework and achieve closure of the set-up programme. The GBE-DESNZ Framework Document was approved and published on May 12, and their first Business Plan has been approved by DESNZ Ministers. There is a clear plan for further business case development and approval and this is being implemented with NISTA & HMT.","startDate":null,"endDate":"2026-10-30","scheduleNarrative":"Exempt under Section 22 - Information intended for future publication","fyBaseline":22.0,"fyForecast":22.0,"fyVariance":22.0,"varianceNarrative":"Exempt under Section 22 – Information intended for future publication ​","wholeLifeCost":null,"costNarrative":"Exempt under Section 22 - Information intended for future publication","benefits":null,"benefitsNarrative":"Exempt under Section 22 - Information intended for future publication","themes":["Approvals & decisions","Delivery & schedule","Workforce & capability","Cost & funding"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This reflects significant progress made in establishing the organisational, governance and delivery frameworks required for GBE to move towards operational independence and the closure of the set-up programme. The Programme has received CST…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"DESNZ_0472_2425-Q4","year":2026,"name":"Great British Energy","department":"DESNZ","category":"Infrastructure and Construction","description":"The aim of the GBE set up programme is to create GBE GovCo, a publicly owned energy company that will drive the deployment of clean energy, enhance energy independence, and create jobs across the UK. This aim will deliver on the Government’s Mission to establish GBE as the mechanism for delivery of the key outcomes of the GBE Programme as set out in the Labour Party 2024 UK General Election manifesto. Namely, ability to strategically invest in and own clean energy projects, foster collaboration with key stakeholders, and support local and community energy initiatives. The desired outcome of this programme is the creation of a fully functioning, independent and publicly owned energy company called Great British Energy (GBE).","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This reflects significant progress made in establishing the organisational, governance and delivery frameworks required for GBE to move towards operational independence and the closure of the set-up programme. The Programme has received CST approval for the ALB set-up Full Business Case, enabling both DESNZ and GBE to proceed with FY26/27 set-up spend. On 4 March, the programme received the Subsidy Advice Unit’s (SAU) final referral report on the Subsidy Control Assessment for GBE’s 2026–2029 activity. The SAU provided a favourable assessment, confirming that the policy objective, the rationale for using a subsidy, and the necessity of the scheme have been clearly articulated. The Aberdeen HQ remains on track to open later in 2026, and recruitment is progressing across all levels following approval of their workforce and senior pay case, and an interim leadership team in place. The first tranche of the permanent Non-Executive Director (NED) appointments is underway. GBE has made significant progress with senior recruitment, with a Local Managing Director (MD) identified and a Strategy Director appointed. Interviews for an onshore and offshore wind MD took place in May. GBE has also agreed its workforce pay case and launched a significant recruitment campaign to stabilise its workforce and increase its presence in Aberdeen. This has been supported by a recruitment event held in Aberdeen on 3 June. Across the programme, GBE has made its first supply chain investment - a £40 million equity investment in ITM Power. It has also published the Local Power Plan together with DESNZ, setting out a clear vision to transform the UK’s local and community energy sector, and made its first investment in 100MW Pentland Offshore Wind Farm alongside the National Wealth Fund and Scottish National Investment Bank. Although the programme delivery confidence assessment remains Amber, risks continue to be actively managed. The programme remains on track to implement the Sponsorship Assurance Framework and achieve closure of the set-up programme. The GBE-DESNZ Framework Document was approved and published on May 12, and their first Business Plan has been approved by DESNZ Ministers. There is a clear plan for further business case development and approval and this is being implemented with NISTA & HMT.","startDate":null,"endDate":"2026-10-30","scheduleNarrative":"Exempt under Section 22 - Information intended for future publication","fyBaseline":22.0,"fyForecast":22.0,"fyVariance":22.0,"varianceNarrative":"Exempt under Section 22 – Information intended for future publication ​","wholeLifeCost":null,"costNarrative":"Exempt under Section 22 - Information intended for future publication","benefits":null,"benefitsNarrative":"Exempt under Section 22 - Information intended for future publication","themes":["Approvals & decisions","Delivery & schedule","Workforce & capability","Cost & funding"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This reflects significant progress made in establishing the organisational, governance and delivery frameworks required for GBE to move towards operational independence and the closure of the set-up programme. The Programme has received CST…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":null,"ratingDelta":null,"transition":"Not comparable","endDateDeltaDays":null,"attentionScore":25,"attentionReasons":["Current published delivery confidence is Amber","In-year forecast variance is +22.0%"]},{"id":"DFE_0109_2223-Q1","year":2026,"name":"Lifelong Learning Entitlement","department":"DFE","category":"Government Transformation and Service Delivery","description":"The Lifelong Learning Entitlement (LLE) was announced by the then Prime Minister in 2020 and responds to recommendations in the Augar review of post-18 education and training. The LLE will deliver a transformational change to the student finance system in England, by broadening access to high-quality, flexible education and training. The LLE will launch in academic year 2026/27 for learners studying courses starting on or after 1 January 2027. From launch, it will provide individuals with a loan entitlement the equivalent to four years of full-time undergraduate tuition fees for use over their working lives to learn, upskill and retrain. Learners will be able to use this new entitlement more flexibly than ever before to fund individual modules as well as full courses at levels 4 to 6, regardless of whether they are provided in colleges, universities, or independent providers. It will create opportunities for both young people and adults to develop the skills needed to succeed in life, contributing to growth across the entire country.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Delivery confidence for 2025/26 remains Amber. The programme has made steady progress towards launch in 2026/27. The Amber rating is primarily driven by the programme’s inherent complexity, tight and inflexible legislative timelines ahead of launch, capacity pressures within delivery partners, and uneven sector readiness. These risks are ongoing and require careful management. The focus now is on delivering legislation to schedule, maintaining delivery partner capacity and strengthening engagement with providers to secure readiness. Confidence will improve if legislative milestones are met, sector preparedness becomes more consistent, and system testing remains on track. Delay in these areas will place pressure on launch plans given limited contingency.","startDate":"2020-09-30","endDate":null,"scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 has been brought forward to 31/03/27. This recognises that the LLE will launch in September 2026 for courses starting in January 2027; after that the programme will transition into BAU operational delivery structures.","fyBaseline":22.0,"fyForecast":22.0,"fyVariance":22.0,"varianceNarrative":"Exempt under Section 22 – Information intended for future publication ​","wholeLifeCost":null,"costNarrative":"Exempt under Section 22 - Information intended for future publication","benefits":null,"benefitsNarrative":"Exempt under Section 22 - Information intended for future publication","themes":["Delivery & schedule","Workforce & capability","Cost & funding","Technical & integration"],"evidenceExcerpt":"Delivery confidence for 2025/26 remains Amber. The programme has made steady progress towards launch in 2026/27. The Amber rating is primarily driven by the programme’s inherent complexity, tight and inflexible legislative timelines ahead of launch, capacity pressures within delivery partners, and uneven sector readiness. These risks are ongoing and require…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"DFE_0109_2223-Q1","year":2023,"name":"Lifelong Loan Entitlement","department":"DFE","category":"Government Transformation and Service Delivery","description":"","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 22 of the Freedom of Information Act 2000 (Information intended for future publication)","startDate":null,"endDate":null,"scheduleNarrative":"Exempt under Section 22 of the Freedom of Information Act 2000 (Information intended for future publication)","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 22 of the Freedom of Information Act 2000 (Information intended for future publication)","wholeLifeCost":null,"costNarrative":"Exempt under Section 22 of the Freedom of Information Act 2000 (Information intended for future publication)","benefits":null,"benefitsNarrative":"Exempt under Section 22 of the Freedom of Information Act 2000 (Information intended for future publication)","themes":[],"evidenceExcerpt":"Exempt under Section 22 of the Freedom of Information Act 2000 (Information intended for future publication) Exempt under Section 22 of the Freedom of Information Act 2000 (Information intended for future publication)","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"DFE_0109_2223-Q1","year":2024,"name":"Lifelong Learning Entitlement","department":"DFE","category":"Government Transformation and Service Delivery","description":"The Lifelong Learning Entitlement (LLE) proposed to introduce a new student finance system from 2025, co-designed with the Student Loans Company (SLC). The LLE will provide individuals with a loan entitlement to the equivalent of 4 years of post-18 education to use over their working lives (e.g. 37,000 in today's fees) up until the age of 60. It will be available for both full years of study at higher technical and degree levels, as well as, for the first time, for modules of high-value courses, regardless of whether they are provided in colleges or universities. Under this flexible skills system, people will be able to space out their studies and learn at a pace that is right for them, including choosing to build up their qualifications over time, within both FE and HE providers. They will have a real choice in how and when they study to acquire new life-changing skills. The LLE also aims to create a more streamlined funding system and make it easier for students to navigate the options available","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. An IPA assurance review in Feb 24 recognised the journey towards the LLE's introduction is ambitious and the programme must ensure all of its constituent parts are functional and operational upon launch. In recognition of the complexity of the programme and the challenges of launching a new system impacting hundreds of thousands of learners, the Conservative Government opted to move to a phased rollout of the LLE from Sep 25, with courses starting from Jan 26.","startDate":"2020-09-30","endDate":"2027-12-31","scheduleNarrative":"The project's end-date at 23/24-Q4 is 2027-12-31. This is primarily due to the following factors. Compared to 22/23-Q4, the project's end-date changed from 31 December 2025 to 31 December 2027. This is primarily due to the government allowing providers longer to prepare for registration with OfS, which they need to do to access the LLE. In the LLE consultation response, published in March 2023, the Government asked OfS to develop a third category of registration to provide an appropriate approach for smaller providers typically offering level 4 and 5 qualifications. Subject to consultation, this would have included transitional arrangements for providers from 2025 to 2027. To support this, the government is extending existing advanced learner loan funding for a further 2 years, until 2027, for providers who have not registered with OfS under either of the 2 existing categories. The programme end date has therefore moved out. Overall the programme is making good progress on the schedule, moving at pace to lay the required secondary legislation and develop the LLE systems. Students will be able to apply for LLE courses from September 2025, for courses starting from January 2026.","fyBaseline":0.0,"fyForecast":17.59,"fyVariance":null,"varianceNarrative":"The GMPP project did not provide data","wholeLifeCost":0.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 23/24-Q4 is 0m. This is primarily due to the following factors. The project's Whole Life Costs have not yet been agreed by the department.","benefits":0.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 0m. The project's monetised benefits have not yet been agreed by the department.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Technical & integration"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. An IPA assurance review in Feb 24 recognised the journey towards the LLE's introduction is ambitious and the programme must ensure all of its constituent parts are functional and operational upon launch. In…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"DFE_0109_2223-Q1","year":2025,"name":"LIFELONG LEARNING ENTITLEMENT","department":"DfE","category":"Government Transformation and Service Delivery","description":"The Lifelong Learning Entitlement (LLE) was announced by the Government in 2020 and responds to recommendations in the Augar Review of post-18 education and training. The LLE will deliver a transformational change to the student finance system in England, by broadening access to high-quality, flexible education and training. The LLE will launch in academic year 2026/27 for learners studying courses starting on or after 1 January 2027. From launch, it will provide individuals with a loan entitlement the equivalent to four years of full-time undergraduate tuition fees for use over their working lives to learn, upskill and retrain. Learners will be able to use this new entitlement more flexibly than ever before to fund individual modules as well as full courses at Levels 4 to 6, regardless of whether they are provided in colleges, universities, or independent providers. It will create opportunities for both young people and adults to develop the skills needed to succeed in life, contributing to growth across the entire country.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Section 22 - Information intended for future publication.","startDate":"2020-09-30","endDate":null,"scheduleNarrative":"Section 22 - Information intended for future publication","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 22 - Information intended for future publication","wholeLifeCost":null,"costNarrative":"Section 22 - Information intended for future publication","benefits":null,"benefitsNarrative":"Section 22 - Information intended for future publication","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Section 22 - Information intended for future publication. Section 22 - Information intended for future publication","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"DFE_0109_2223-Q1","year":2026,"name":"Lifelong Learning Entitlement","department":"DFE","category":"Government Transformation and Service Delivery","description":"The Lifelong Learning Entitlement (LLE) was announced by the then Prime Minister in 2020 and responds to recommendations in the Augar review of post-18 education and training. The LLE will deliver a transformational change to the student finance system in England, by broadening access to high-quality, flexible education and training. The LLE will launch in academic year 2026/27 for learners studying courses starting on or after 1 January 2027. From launch, it will provide individuals with a loan entitlement the equivalent to four years of full-time undergraduate tuition fees for use over their working lives to learn, upskill and retrain. Learners will be able to use this new entitlement more flexibly than ever before to fund individual modules as well as full courses at levels 4 to 6, regardless of whether they are provided in colleges, universities, or independent providers. It will create opportunities for both young people and adults to develop the skills needed to succeed in life, contributing to growth across the entire country.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Delivery confidence for 2025/26 remains Amber. The programme has made steady progress towards launch in 2026/27. The Amber rating is primarily driven by the programme’s inherent complexity, tight and inflexible legislative timelines ahead of launch, capacity pressures within delivery partners, and uneven sector readiness. These risks are ongoing and require careful management. The focus now is on delivering legislation to schedule, maintaining delivery partner capacity and strengthening engagement with providers to secure readiness. Confidence will improve if legislative milestones are met, sector preparedness becomes more consistent, and system testing remains on track. Delay in these areas will place pressure on launch plans given limited contingency.","startDate":"2020-09-30","endDate":null,"scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 has been brought forward to 31/03/27. This recognises that the LLE will launch in September 2026 for courses starting in January 2027; after that the programme will transition into BAU operational delivery structures.","fyBaseline":22.0,"fyForecast":22.0,"fyVariance":22.0,"varianceNarrative":"Exempt under Section 22 – Information intended for future publication ​","wholeLifeCost":null,"costNarrative":"Exempt under Section 22 - Information intended for future publication","benefits":null,"benefitsNarrative":"Exempt under Section 22 - Information intended for future publication","themes":["Delivery & schedule","Workforce & capability","Cost & funding","Technical & integration"],"evidenceExcerpt":"Delivery confidence for 2025/26 remains Amber. The programme has made steady progress towards launch in 2026/27. The Amber rating is primarily driven by the programme’s inherent complexity, tight and inflexible legislative timelines ahead of launch, capacity pressures within delivery partners, and uneven sector readiness. These risks are ongoing and require…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"DFE_0109_2223-Q1","year":2025,"name":"LIFELONG LEARNING ENTITLEMENT","department":"DfE","category":"Government Transformation and Service Delivery","description":"The Lifelong Learning Entitlement (LLE) was announced by the Government in 2020 and responds to recommendations in the Augar Review of post-18 education and training. The LLE will deliver a transformational change to the student finance system in England, by broadening access to high-quality, flexible education and training. The LLE will launch in academic year 2026/27 for learners studying courses starting on or after 1 January 2027. From launch, it will provide individuals with a loan entitlement the equivalent to four years of full-time undergraduate tuition fees for use over their working lives to learn, upskill and retrain. Learners will be able to use this new entitlement more flexibly than ever before to fund individual modules as well as full courses at Levels 4 to 6, regardless of whether they are provided in colleges, universities, or independent providers. It will create opportunities for both young people and adults to develop the skills needed to succeed in life, contributing to growth across the entire country.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Section 22 - Information intended for future publication.","startDate":"2020-09-30","endDate":null,"scheduleNarrative":"Section 22 - Information intended for future publication","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 22 - Information intended for future publication","wholeLifeCost":null,"costNarrative":"Section 22 - Information intended for future publication","benefits":null,"benefitsNarrative":"Section 22 - Information intended for future publication","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Section 22 - Information intended for future publication. Section 22 - Information intended for future publication","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":null,"attentionScore":25,"attentionReasons":["Current published delivery confidence is Amber","In-year forecast variance is +22.0%"]},{"id":"DFE_0018_2021-Q3","year":2026,"name":"School Rebuilding Programme","department":"DFE","category":"Infrastructure and Construction","description":"The School Rebuilding Programme carries out major rebuilding and refurbishment projects at school and sixth-form college buildings across England. We have committed almost £20 billion investment in the School Rebuilding Programme through to 2034–35, delivering rebuilding projects at over 750 schools and sixth-form colleges across England. There are over 500 schools already in the programme and we will select a further 250 schools to join the programme by early 2027.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Delivery confidence is Amber and is moving towards Green, reflecting strong performance against the programme’s key delivery metrics in 2025–26, including exceeding targets for both contract awards and project commencements, both by more than 10%. The government is investing almost £20 billion in the School Rebuilding Programme through to 2034–35, rebuilding or refurbishing buildings at over 750 schools and sixth-form colleges across England, with more than 500 projects already in the programme. The nomination round for the next 250 projects has now closed, and we will work closely with local authorities and other key stakeholders to assess applications, prioritising schools and sixth-form colleges in the worst condition and in areas where places are needed. Schools and sixth-form colleges selected for the School Rebuilding Programme will be confirmed by early 2027.","startDate":"2020-11-01","endDate":null,"scheduleNarrative":"Exempt under Section 22 - Information intended for future publication","fyBaseline":22.0,"fyForecast":22.0,"fyVariance":22.0,"varianceNarrative":"Exempt under Section 22 – Information intended for future publication ​","wholeLifeCost":null,"costNarrative":"Exempt under Section 22 - Information intended for future publication","benefits":null,"benefitsNarrative":"Exempt under Section 22 - Information intended for future publication","themes":["Delivery & schedule","Commercial & supply chain"],"evidenceExcerpt":"Delivery confidence is Amber and is moving towards Green, reflecting strong performance against the programme’s key delivery metrics in 2025–26, including exceeding targets for both contract awards and project commencements, both by more than 10%. The government is investing almost £20 billion in the School Rebuilding Programme through to 2034–35,…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"DFE_0018_2021-Q3","year":2021,"name":"School Rebuilding Programme","department":"DFE","category":"Infrastructure and Construction","description":"The School Rebuilding Programme (SRP) is undertaking major rebuilding and refurbishment projects targeted at school and sixth form college buildings in the worst condition across England. The programme was announced by the PM in June 2020. The number of projects in the programme was confirmed publicly in HMT SR 2020 documentation, with a commitment to announcing 50 new school rebuilding projects a year for ten years. The first 50 projects were announced in February 2021, with the next round of projects expected to be announced in the summer.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber.This is primarily due to the following factors: Since announcing the programme, we have made good progress on programme set up and we have started delivery. The first round of projects is progressing well to agreed timescales and we are currently selecting the second round, on track to announce these in summer 2021 as planned. The programme is subject to a HMT approval in May 2021 before the first projects can proceed to contract. We are in ongoing discussions with HMT that will continue throughout April and May. The full programme budget will be confirmed at the next SR.","startDate":"2020-11-01","endDate":"2033-03-31","scheduleNarrative":"The project end-date is 31 March 2033. This is primarily due to the following factors: The programme scheduled end date remains unchanged.","fyBaseline":0.0,"fyForecast":0.0,"fyVariance":null,"varianceNarrative":"N/A - no costs yet reported on.","wholeLifeCost":0.0,"costNarrative":"N/A - no costs yet reported on.","benefits":null,"benefitsNarrative":"","themes":["Delivery & schedule","Approvals & decisions","Commercial & supply chain","Cost & funding"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber.This is primarily due to the following factors: Since announcing the programme, we have made good progress on programme set up and we have started delivery. The first round of projects is progressing well to agreed timescales and we are currently selecting the second…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21"},{"id":"DFE_0018_2021-Q3","year":2022,"name":"School Rebuilding Programme","department":"DFE","category":"Infrastructure and Construction","description":"The School Rebuilding Programme (SRP) is undertaking major rebuilding and refurbishment projects targeted at school and sixth form college buildings in the worst condition across England. The programme was announced by the PM in June 2020. The number of projects in the programme was confirmed publicly in HMT SR 2020 documentation, with a commitment to 50 projects a year/500 over ten years. An initial programme budget up to the end of the expected SR21 period was agreed with HMT in May 2021 (HMT confirmation letter received in July 2021) as part of the programme's clearance through the Treasury Approval Process (TAP). The first 100 projects announced last year are in delivery and a significant programme milestone was achieved (and met a Prime Ministerial commitment) with a number of the most advanced projects having signed contracts and started in site in September 2021. The next selection round is underway and we aim to provisionally select up to 300 schools later this year.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 remained at Amber The IPA has not yet communicated its DCA to your project. Until they do, please use your SRO DCA for the current quarter as a proxy for the IPA DCA, and write a narrative on the key factors that led your projects DCA to increase/stagnate/decrease since the last ARMP. The first 100 projects announced last year are in delivery. We achieved a significant programme milestone (and met a Prime Ministerial commitment) with a number (7) of the most advanced projects having signed contracts and started work on-site during September 2021, with a further 3 projects entering contract in March 2022. The next selection round is underway and we aim to provisionally select up to 300 schools later this year.","startDate":"2020-11-01","endDate":null,"scheduleNarrative":"Compared to 2021-Q4, your project end-date remained scheduled to finish on 31 MAR 2033 . This is primarily due to the following factors: The programme scheduled end date remains unchanged.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 22 of the Freedom of Information Act 2000 (Information intended for future publication)","wholeLifeCost":null,"costNarrative":"Exempt under Section 22 of the Freedom of Information Act 2000 (Information intended for future publication)","benefits":null,"benefitsNarrative":"","themes":["Delivery & schedule","Commercial & supply chain","Cost & funding","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 remained at Amber The IPA has not yet communicated its DCA to your project. Until they do, please use your SRO DCA for the current quarter as a proxy for the IPA DCA, and write a narrative on the key factors that led your projects…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"DFE_0018_2021-Q3","year":2023,"name":"School Rebuilding Programme","department":"DFE","category":"Infrastructure and Construction","description":"The School Rebuilding Programme (SRP) is undertaking major rebuilding and refurbishment projects targeted at school and sixth form college buildings in the worst condition across England. The programme was announced by the PM in June 2020. The number of projects in the programme was confirmed publicly in HMT SR 2020 documentation, with a commitment to announcing 50 new school rebuilding projects a year for ten years. An initial programme budget was agreed with HMT in May 2021 (HMT confirmation letter received in July 2021) as part of the programmes clearance through the Treasury Approval Process (TAP). The first 161 projects from Rounds 1-3 are in delivery and we achieved a significant programme milestone with the first SRP project handed over in February 2023. Additionally, 24 projects have now entered contract as of March 2023, 15 in the 22/23 financial year. We announced a further 239 schools into the programme in December 2022, from nominations received in 2022. These schools will enter into delivery at approximately 50 projects per year over the next 5 years.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. The first 161 projects from Rounds 1-3 are in delivery and we achieved a significant programme milestone with the first SRP project handed over in February 2023. Additionally, 24 projects have now entered contract as of March 2023, 15 in the 22/23 financial year.We announced a further 239 schools into the programme in December 2022, from nominations received in 2022. These schools will enter into delivery at approximately 50 projects per year over the next 5 years.","startDate":"2020-11-01","endDate":null,"scheduleNarrative":"The programme scheduled end date remains changed.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 22 of the Freedom of Information Act 2000 (Information intended for future publication)","wholeLifeCost":null,"costNarrative":"Exempt under Section 22 of the Freedom of Information Act 2000 (Information intended for future publication)","benefits":null,"benefitsNarrative":"Exempt under Section 22 of the Freedom of Information Act 2000 (Information intended for future publication)","themes":["Delivery & schedule","Cost & funding","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. The first 161 projects from Rounds 1-3 are in delivery and we achieved a significant programme milestone with the first SRP project handed over in February 2023.…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"DFE_0018_2021-Q3","year":2024,"name":"School Rebuilding Programme","department":"DFE","category":"Infrastructure and Construction","description":"The School Rebuilding Programme (SRP) is undertaking major rebuilding and refurbishment projects targeted at school and sixth form college buildings in the worst condition across England. The programme was announced by the PM in June 2020. The number of projects in the 10-year programme was confirmed at SR 2020, with a commitment to 500 projects (50 per year). An initial programme budget was agreed with HMT in May 2021 (HMT confirmation letter was received in July 2021) as part of the programme's clearance through the Treasury Approval Process (TAP), with funding up to FY2024-25 confirmed at SR21.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. On 8 February, we announced the funding route for all schools and colleges with RAAC confirmed in their buildings - meaning we currently have 513 schools in the programme. There is a possibility that the number of RAAC cases increases but we expect the number of any further cases to be low. We now have 218 projects in delivery for the programme and at the beginning of April, we have entered into contract on 54 and handed over 10 projects. This means we met our targets for the number of projects to enter into contract award for the financial spend forecasts for the 2023/24 financial year. We are currently reviewing the prioritisation of the remaining 295 projects, including those that joined the programme on the 8 February, these remaining projects being previously selected schools and RAAC schools, as well schools facing serious structural safety issues, entering SRP.","startDate":"2020-11-01","endDate":"2036-03-31","scheduleNarrative":"The project's end-date at 23/24-Q4 is 2036-03-31. This is primarily due to the following factors. The programme scheduled end date was updated to reflect the programme financial forecasts.","fyBaseline":0.0,"fyForecast":0.0,"fyVariance":null,"varianceNarrative":"ARMP adjustments - Project not yet in a position to give cost/schedule","wholeLifeCost":null,"costNarrative":"ARMP adjustments - Project not yet in a position to give cost/schedule","benefits":null,"benefitsNarrative":"ARMP adjustments - Project not yet in a position to give cost/schedule","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. On 8 February, we announced the funding route for all schools and colleges with RAAC confirmed in their buildings - meaning we currently have 513 schools in the…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"DFE_0018_2021-Q3","year":2025,"name":"SCHOOL REBUILDING PROGRAMME","department":"DfE","category":"Infrastructure and Construction","description":"The School Rebuilding Programme was announced in June 2020 to carry out major rebuilding and refurbishment projects at primary, secondary and sixth form college buildings across England, with buildings prioritised based on their condition. The ten-year programme launched with a commitment to 500 rebuilding projects over the next decade, replacing poor condition and ageing school buildings with modern, energy efficient designs.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Section 22 - Information intended for future publication.","startDate":"2020-06-29","endDate":null,"scheduleNarrative":"","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 22 - Information intended for future publication","wholeLifeCost":null,"costNarrative":"Section 22 - Information intended for future publication","benefits":null,"benefitsNarrative":"Section 22 - Information intended for future publication","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Section 22 - Information intended for future publication.","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"DFE_0018_2021-Q3","year":2026,"name":"School Rebuilding Programme","department":"DFE","category":"Infrastructure and Construction","description":"The School Rebuilding Programme carries out major rebuilding and refurbishment projects at school and sixth-form college buildings across England. We have committed almost £20 billion investment in the School Rebuilding Programme through to 2034–35, delivering rebuilding projects at over 750 schools and sixth-form colleges across England. There are over 500 schools already in the programme and we will select a further 250 schools to join the programme by early 2027.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Delivery confidence is Amber and is moving towards Green, reflecting strong performance against the programme’s key delivery metrics in 2025–26, including exceeding targets for both contract awards and project commencements, both by more than 10%. The government is investing almost £20 billion in the School Rebuilding Programme through to 2034–35, rebuilding or refurbishing buildings at over 750 schools and sixth-form colleges across England, with more than 500 projects already in the programme. The nomination round for the next 250 projects has now closed, and we will work closely with local authorities and other key stakeholders to assess applications, prioritising schools and sixth-form colleges in the worst condition and in areas where places are needed. Schools and sixth-form colleges selected for the School Rebuilding Programme will be confirmed by early 2027.","startDate":"2020-11-01","endDate":null,"scheduleNarrative":"Exempt under Section 22 - Information intended for future publication","fyBaseline":22.0,"fyForecast":22.0,"fyVariance":22.0,"varianceNarrative":"Exempt under Section 22 – Information intended for future publication ​","wholeLifeCost":null,"costNarrative":"Exempt under Section 22 - Information intended for future publication","benefits":null,"benefitsNarrative":"Exempt under Section 22 - Information intended for future publication","themes":["Delivery & schedule","Commercial & supply chain"],"evidenceExcerpt":"Delivery confidence is Amber and is moving towards Green, reflecting strong performance against the programme’s key delivery metrics in 2025–26, including exceeding targets for both contract awards and project commencements, both by more than 10%. The government is investing almost £20 billion in the School Rebuilding Programme through to 2034–35,…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"DFE_0018_2021-Q3","year":2025,"name":"SCHOOL REBUILDING PROGRAMME","department":"DfE","category":"Infrastructure and Construction","description":"The School Rebuilding Programme was announced in June 2020 to carry out major rebuilding and refurbishment projects at primary, secondary and sixth form college buildings across England, with buildings prioritised based on their condition. The ten-year programme launched with a commitment to 500 rebuilding projects over the next decade, replacing poor condition and ageing school buildings with modern, energy efficient designs.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Section 22 - Information intended for future publication.","startDate":"2020-06-29","endDate":null,"scheduleNarrative":"","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 22 - Information intended for future publication","wholeLifeCost":null,"costNarrative":"Section 22 - Information intended for future publication","benefits":null,"benefitsNarrative":"Section 22 - Information intended for future publication","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Section 22 - Information intended for future publication.","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":null,"attentionScore":25,"attentionReasons":["Current published delivery confidence is Amber","In-year forecast variance is +22.0%"]},{"id":"DESNZ_0375_2425-Q1","year":2026,"name":"Boiler Upgrade Scheme","department":"DESNZ","category":"Infrastructure and Construction","description":"The Boiler Upgrade Scheme (BUS) is part of a wider package of measures to drive significant heat pump deployment and support the expansion of the low carbon heat market. The scheme provides grants to encourage property owners to replace existing fossil fuel heating with more efficient, low carbon heating systems including air source heat pumps (ASHP), ground source heat pumps (GSHP) and, in limited circumstances, biomass boilers. The grant available for an ASHP and GSHP is £7,500, and £5,000for biomass boilers. The scheme was set to run from April 2022 until March 2025 supported by £450m. The scheme has been extended to 2029/30 and the funding allocation for 2025/26 to 2029/30 is £2,687m as set out in the Warm Homes Plan.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The SRO delivery confidence assessment rating for 25/26 remained at Amber. The scheme is operationally mature and performing strongly, with sustained year‑on‑year growth in deployment. Applications in 2025/26 were up 19% on 24/25, with redemptions up 21%. The BUS Evaluation evidenced a high level of property owner satisfaction at 91% and MCS outreach recorded an average 95% satisfaction rate. The implementation of scheme changes announced in the November 2025 Government Response, will improve access, stimulate demand and strengthen consumer protection, and come into force from 28 April 2026. The Full Business Case for FY 2026/27 to 2029/30 has received TAP approval, confirming funding for the remainder of the scheme timeline. While demand and delivery continue to grow, overall delivery confidence remains dependent on wider market and policy factors, including the delivery of the Warm Homes Plan; given the materiality of these dependencies, an Amber rating remains appropriate.","startDate":null,"endDate":"2030-03-31","scheduleNarrative":"The project end date in 2025/26 was extended from March 2026 to March 2030. This reflects the extension of the scheme following the Spending Review, which provided additional funding and extended delivery to March 2030.","fyBaseline":297.75,"fyForecast":244.58,"fyVariance":17.86,"varianceNarrative":"During 2025/26, the scheme was extended to 2030 following the Spending Review, which agreed an increased budget for the remaining years of the scheme. This extended the delivery period by four years and increased total funding for the extension period to £2,392m. Funding allocations for these years were set out in the Warm Homes Plan in January 2026.","wholeLifeCost":3054.03,"costNarrative":"The project’s departmentally agreed whole life cost increased due to the extension of the scheme to 2030 following the Spending Review, which increased both the duration and scale of delivery. As a result, total funding for the extension period increased with the annual budgets set out in the Warm Homes Plan in January 2026.","benefits":4043.09,"benefitsNarrative":"The project’s departmentally agreed benefits at Q4 2025/26 are estimated at £4,043m (real prices, base year 24/25). These benefits primarily reflect the monetised social value of carbon emissions reductions and air quality improvements arising from the installation of low-carbon heating systems under the scheme. These benefits are partially offset by disbenefits, reflecting the additional capital and maintenance costs associated with these technologies, as well as long run variable costs of fuel, relative to a like for like replacement of incumbent heating systems, which are typically fossil fuel boilers.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"The SRO delivery confidence assessment rating for 25/26 remained at Amber. The scheme is operationally mature and performing strongly, with sustained year‑on‑year growth in deployment. Applications in 2025/26 were up 19% on 24/25, with redemptions up 21%. The BUS Evaluation evidenced a high level of property owner satisfaction at 91% and MCS outreach…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"DESNZ_0375_2425-Q1","year":2025,"name":"Boiler Upgrade Scheme","department":"DESNZ","category":"Infrastructure and Construction","description":"The Boiler Upgrade Scheme (BUS) is part of a package of measures designed to deliver significant heat pump deployment growth and support the expansion of the low carbon heat market. The scheme provides grants to encourage property owners to replace existing fossil fuel heating with more efficient, low carbon heating systems including air source heat pumps (ASHP), ground source heat pumps (GSHP) and, in limited circumstances, biomass boilers. The grant available for an ASHP and GSHP is £7,500, while the grant available for a biomass boilers is £5,000. The scheme was set to run from April 2022 until March 2025 supported by £450m (split evenly across the three years). The scheme has been extended and the funding allocation for 2025/26 is £295m. Funding for subsequent years (2026/27 onwards) is subject to the second phase of the spending review.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER. This is due to‚ The scheme being a well-established project in its fourth year of delivery that is performing strong both operationally and in terms of deployment. The £150 million budget for the 3rd year of the scheme was exceeded, allowing an increase in the deployment of heat pumps, with total deployment reaching £190 million. Moreover, the scheme has a TAP approved budget for 25/26 of £295 million which allows room for further growth to build on year three of the scheme. The operational success of the scheme, teamed with strong deployment, suggests the scheme is close to a green rating. However, external factors—such as the ongoing spending review—introduce uncertainty. Until these are resolved, the scheme will retain an Amber RAG rating.","startDate":"2022-04-01","endDate":null,"scheduleNarrative":"The project's end-date at 24/25-Q4 is scheduled to be 31/03/2026. This is primarily due to the following factors‚ The spending review outcome as this is where a decision will be made on the tenure of the scheme and the associated budgets. We expect the scheme to continue beyond the 31/03/26 date, but cannot currently confirm the exact length of this extension.","fyBaseline":160.0,"fyForecast":211.1,"fyVariance":31.94,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ Increased heat pump deployment is the driving factor of the budget variance. This is due to a positive increase in the uptake of vouchers under the scheme, allowing for more Heat Pump installations. For example, in 23/24 the scheme received 22,111 voucher applications and paid out 13,847 vouchers. Due to increased interest in heat pumps as a result of the scheme, 24/25 saw a significant increase with 38,412 voucher applications received and 25,331 paid out.","wholeLifeCost":794.4,"costNarrative":"The project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) is 487. This is primarily due to the following factors‚ The scheme was initially due to run for three years only with a total budget of £450 million, allocated equally at £150 million per year between 2022- 2025. Therefore the further funding was for the resourcing of the scheme across these years including funding Ofgem to administer the scheme and a small policy team at DESNZ.","benefits":987.0,"benefitsNarrative":"The project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) is 987. This is primarily due to the following factors‚ The monetised benefits are the estimated social value of emissions reduced and air quality improvements from the installation of heat pumps on the scheme. The benefits also include any reductions in long term variable costs when switching from a fossil fuel boiler to a heat pump.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER. This is due to‚ The scheme being a well-established project in its fourth year of delivery that is performing strong both operationally and in terms of deployment. The £150 million budget for the 3rd year of the scheme was exceeded, allowing an increase in the…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"DESNZ_0375_2425-Q1","year":2026,"name":"Boiler Upgrade Scheme","department":"DESNZ","category":"Infrastructure and Construction","description":"The Boiler Upgrade Scheme (BUS) is part of a wider package of measures to drive significant heat pump deployment and support the expansion of the low carbon heat market. The scheme provides grants to encourage property owners to replace existing fossil fuel heating with more efficient, low carbon heating systems including air source heat pumps (ASHP), ground source heat pumps (GSHP) and, in limited circumstances, biomass boilers. The grant available for an ASHP and GSHP is £7,500, and £5,000for biomass boilers. The scheme was set to run from April 2022 until March 2025 supported by £450m. The scheme has been extended to 2029/30 and the funding allocation for 2025/26 to 2029/30 is £2,687m as set out in the Warm Homes Plan.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The SRO delivery confidence assessment rating for 25/26 remained at Amber. The scheme is operationally mature and performing strongly, with sustained year‑on‑year growth in deployment. Applications in 2025/26 were up 19% on 24/25, with redemptions up 21%. The BUS Evaluation evidenced a high level of property owner satisfaction at 91% and MCS outreach recorded an average 95% satisfaction rate. The implementation of scheme changes announced in the November 2025 Government Response, will improve access, stimulate demand and strengthen consumer protection, and come into force from 28 April 2026. The Full Business Case for FY 2026/27 to 2029/30 has received TAP approval, confirming funding for the remainder of the scheme timeline. While demand and delivery continue to grow, overall delivery confidence remains dependent on wider market and policy factors, including the delivery of the Warm Homes Plan; given the materiality of these dependencies, an Amber rating remains appropriate.","startDate":null,"endDate":"2030-03-31","scheduleNarrative":"The project end date in 2025/26 was extended from March 2026 to March 2030. This reflects the extension of the scheme following the Spending Review, which provided additional funding and extended delivery to March 2030.","fyBaseline":297.75,"fyForecast":244.58,"fyVariance":17.86,"varianceNarrative":"During 2025/26, the scheme was extended to 2030 following the Spending Review, which agreed an increased budget for the remaining years of the scheme. This extended the delivery period by four years and increased total funding for the extension period to £2,392m. Funding allocations for these years were set out in the Warm Homes Plan in January 2026.","wholeLifeCost":3054.03,"costNarrative":"The project’s departmentally agreed whole life cost increased due to the extension of the scheme to 2030 following the Spending Review, which increased both the duration and scale of delivery. As a result, total funding for the extension period increased with the annual budgets set out in the Warm Homes Plan in January 2026.","benefits":4043.09,"benefitsNarrative":"The project’s departmentally agreed benefits at Q4 2025/26 are estimated at £4,043m (real prices, base year 24/25). These benefits primarily reflect the monetised social value of carbon emissions reductions and air quality improvements arising from the installation of low-carbon heating systems under the scheme. These benefits are partially offset by disbenefits, reflecting the additional capital and maintenance costs associated with these technologies, as well as long run variable costs of fuel, relative to a like for like replacement of incumbent heating systems, which are typically fossil fuel boilers.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"The SRO delivery confidence assessment rating for 25/26 remained at Amber. The scheme is operationally mature and performing strongly, with sustained year‑on‑year growth in deployment. Applications in 2025/26 were up 19% on 24/25, with redemptions up 21%. The BUS Evaluation evidenced a high level of property owner satisfaction at 91% and MCS outreach…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"DESNZ_0375_2425-Q1","year":2025,"name":"Boiler Upgrade Scheme","department":"DESNZ","category":"Infrastructure and Construction","description":"The Boiler Upgrade Scheme (BUS) is part of a package of measures designed to deliver significant heat pump deployment growth and support the expansion of the low carbon heat market. The scheme provides grants to encourage property owners to replace existing fossil fuel heating with more efficient, low carbon heating systems including air source heat pumps (ASHP), ground source heat pumps (GSHP) and, in limited circumstances, biomass boilers. The grant available for an ASHP and GSHP is £7,500, while the grant available for a biomass boilers is £5,000. The scheme was set to run from April 2022 until March 2025 supported by £450m (split evenly across the three years). The scheme has been extended and the funding allocation for 2025/26 is £295m. Funding for subsequent years (2026/27 onwards) is subject to the second phase of the spending review.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER. This is due to‚ The scheme being a well-established project in its fourth year of delivery that is performing strong both operationally and in terms of deployment. The £150 million budget for the 3rd year of the scheme was exceeded, allowing an increase in the deployment of heat pumps, with total deployment reaching £190 million. Moreover, the scheme has a TAP approved budget for 25/26 of £295 million which allows room for further growth to build on year three of the scheme. The operational success of the scheme, teamed with strong deployment, suggests the scheme is close to a green rating. However, external factors—such as the ongoing spending review—introduce uncertainty. Until these are resolved, the scheme will retain an Amber RAG rating.","startDate":"2022-04-01","endDate":null,"scheduleNarrative":"The project's end-date at 24/25-Q4 is scheduled to be 31/03/2026. This is primarily due to the following factors‚ The spending review outcome as this is where a decision will be made on the tenure of the scheme and the associated budgets. We expect the scheme to continue beyond the 31/03/26 date, but cannot currently confirm the exact length of this extension.","fyBaseline":160.0,"fyForecast":211.1,"fyVariance":31.94,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ Increased heat pump deployment is the driving factor of the budget variance. This is due to a positive increase in the uptake of vouchers under the scheme, allowing for more Heat Pump installations. For example, in 23/24 the scheme received 22,111 voucher applications and paid out 13,847 vouchers. Due to increased interest in heat pumps as a result of the scheme, 24/25 saw a significant increase with 38,412 voucher applications received and 25,331 paid out.","wholeLifeCost":794.4,"costNarrative":"The project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) is 487. This is primarily due to the following factors‚ The scheme was initially due to run for three years only with a total budget of £450 million, allocated equally at £150 million per year between 2022- 2025. Therefore the further funding was for the resourcing of the scheme across these years including funding Ofgem to administer the scheme and a small policy team at DESNZ.","benefits":987.0,"benefitsNarrative":"The project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) is 987. This is primarily due to the following factors‚ The monetised benefits are the estimated social value of emissions reduced and air quality improvements from the installation of heat pumps on the scheme. The benefits also include any reductions in long term variable costs when switching from a fossil fuel boiler to a heat pump.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER. This is due to‚ The scheme being a well-established project in its fourth year of delivery that is performing strong both operationally and in terms of deployment. The £150 million budget for the 3rd year of the scheme was exceeded, allowing an increase in the…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":null,"attentionScore":24,"attentionReasons":["Current published delivery confidence is Amber","In-year forecast variance is +17.9%"]},{"id":"MOJ_0062_2122-Q3","year":2026,"name":"Evolve: End User Computer Service (EUCS)","department":"MOJ","category":"Information and Communications Technology (ICT)","description":"Ensure the continuation of critical End User Compute Services (EUCS) used by MoJ staff every day, and implement a future-fit model for MoJ users. In order to achieve the future state, there are 3 EUCS streams: 1) The management of 3 re-procurements of EUCS suitable for the current and future needs of MoJ; 2) insource EUCS activity to bring certain capabilities in-house, and 3) migrate users on the legacy FITS services to the organisation's MoJ Official (MoJo) service.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25-Q4, the NISTA Delivery Confidence Assessment (DCA) rating has remained at Green. This is primarily due to successful progression through key procurement exercises, and ongoing confidence in planned delivery.","startDate":"2021-09-27","endDate":"2026-10-15","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end date at 25/26-Q4 changed from 27/03/26 to 15/10/26. This is primarily due to the increased time required to manage the transition between services, and increased contingency based on insights from lessons learned.","fyBaseline":61.62,"fyForecast":38.28,"fyVariance":37.88,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to reduced running costs due to a delay in service stand up and less expenditure on devices than planned.","wholeLifeCost":190.18,"costNarrative":"Compared to financial year 24/25-Q4, The Whole Life Cost has decreased from £193.31m to £190.18m. The budget remains aligned to the current baseline business case. All costs have been reported in 2024/25 base prices in line with NISTA requirements. This is a change from previous years where costs were reported in nominal prices. All costs reflect this accounting reduction regardless of any actual changes.","benefits":27.39,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's Benefits have decreased. However, this is only due to the new NISTA requirement to reflect costs and benefits in 2024/25 base prices, not because monetised benefits have decreased. Forecasted monetised benefits remain in line with the project's business case.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 24/25-Q4, the NISTA Delivery Confidence Assessment (DCA) rating has remained at Green. This is primarily due to successful progression through key procurement exercises, and ongoing confidence in planned delivery. Compared to financial year 24/25-Q4, the project's end date at 25/26-Q4 changed from 27/03/26 to 15/10/26. This is…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"MOJ_0062_2122-Q3","year":2023,"name":"Evolve: End User Computer Service","department":"MOJ","category":"ICT","description":"Ensure the continuation of critical End User Compute Services (EUCS) used by MoJ staff every day, and Implement an EUCS Future State model, which is crucial to achieving the strategic objective of a single technology ecosystem to all 110k MoJ users by 2025. In order to achieve the future state, there are 3 EUCS streams 1) The management of 3 re-procurements of EUCS suitable for the current and future needs of the Authority covering EUCS Platform & Legacy services, Hardware Sourcing and Hardware Support Services, 2) EUCS Insourcing to bring certain capabilities in-house, 3) Converge & Accelerate focuses on the migrating users on the legacy FITS services to the organisations service MoJ Official.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 is Green. This is primarily due to the following factors. This is the first time data has been published for this project, which has been added to GMPP over the last year.The project has been assessed as Green and is on track to deliver against baseline schedule and costs.","startDate":"2021-09-27","endDate":"2025-04-30","scheduleNarrative":"The project's end-date at 22/23-Q4 is 2025-04-30. This is primarily due to the following factors. The project is on track to deliver against the re-baselined schedule.","fyBaseline":33.33,"fyForecast":10.46,"fyVariance":-69.0,"varianceNarrative":"The underspend is due to reduced in-year activity requiring costs to be re-profiled into future years.","wholeLifeCost":340.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 22/23-Q4 is 340m. This is primarily due to the following factors. The Whole Life Costs in the Outline Business Case include projects costs for resources, 3rd party involvement and legal fees, costs to run the service once in place and costs for the purchase of new hardware","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This project currently reports no monetised benefits. The project benefits focus on the continued quality of operation of end user compute services contracts.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Technical & integration"],"evidenceExcerpt":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 is Green. This is primarily due to the following factors. This is the first time data has been published for this project, which has been added to GMPP over the last year.The project has been assessed as Green and is on track to deliver against baseline schedule and costs. The…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"MOJ_0062_2122-Q3","year":2024,"name":"Evolve: End User Computer Service","department":"MOJ","category":"ICT","description":"Ensure the continuation of critical End User Compute Services (EUCS) used by MoJ staff every day, and Implement an EUCS Future State model, which is crucial to achieving the strategic objective of a single technology ecosystem to all 110k MoJ users. In order to achieve the future state, there are 3 EUCS streams 1) The management of 3 re-procurements of EUCS suitable for the current and future needs of the Authority covering EUCS Platform & Legacy services, Hardware Sourcing and Hardware Support Services, 2) EUCS Insourcing to bring certain capabilities in-house, 3) Converge & Accelerate focuses on the migrating users on the legacy Future IT Services to the organisations service MoJ Official.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 22/23-Q4, Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 increased from Green to Amber. This is primarily due to the following factors. Timetable risks due to the complexity of multiple procurements.","startDate":"2021-09-27","endDate":"2025-11-30","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 increased from 2025-04-30 to 2025-11-30. This is primarily due to the following factors. The programme has rebaselined its schedule following realignment of the delivery.","fyBaseline":56.58,"fyForecast":29.49,"fyVariance":-48.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The underspend is due to reduced in-year activities requiring costs to be re-profiled into future years.","wholeLifeCost":340.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 remained at 340m. This is primarily due to the following factors. The Whole Life Cost has remained static, and the budget remains aligned to the current baseline business case.","benefits":0.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 0m. This project currently reports no monetised benefits. The project's benefits focus on the continued quality of operation of End User Compute Services Contracts.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 increased from Green to Amber. This is primarily due to the following factors. Timetable risks due to the complexity of multiple procurements. Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 increased from 2025-04-30 to…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"MOJ_0062_2122-Q3","year":2025,"name":"Evolve: End User Computer Service (EUCS)","department":"MoJ","category":"ICT","description":"Project Brief Description: Ensure the continuation of critical End User Compute Services (EUCS) used by MoJ staff every day, and Implement an EUCS Future State model, which is crucial to achieving the strategic objective of a single technology ecosystem to all 110k MoJ users. In order to achieve the future state, there are 3 EUCS streams 1) The management of 3 re-procurements of EUCS suitable for the current and future needs of the Authority covering EUCS Platform & Legacy services, Hardware Sourcing and Hardware Support Services, 2) EUCS Insourcing to bring certain capabilities in-house, 3) Converge & Accelerate focuses on the migrating users on the legacy Future IT Services to the organisations service MoJ Official.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors‚ The schedule was re-baselined following validation of the procurement approach and is now on track for delivery.","startDate":"2021-09-27","endDate":"2026-03-27","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 30/11/2025 to 27/03/2026. This is primarily due to the following factors‚ The schedule was re-baselined following validation of the procurement approach.","fyBaseline":38.83,"fyForecast":47.85,"fyVariance":23.23,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The overspend is mainly due to the early utilisation of the new contracts.","wholeLifeCost":193.31,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 340 to 193. This is primarily due to the following factors‚ The increase reflects significant savings following approval of Full Business Case.","benefits":28.9,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 0 to 28.90. This is primarily due to the following factors‚ Confirmation of monetisation of benefits following approval of Full Business Case.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors‚ The schedule was re-baselined following validation of the procurement approach and is now on track for delivery. Compared to financial year 23/24-Q4, the…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"MOJ_0062_2122-Q3","year":2026,"name":"Evolve: End User Computer Service (EUCS)","department":"MOJ","category":"Information and Communications Technology (ICT)","description":"Ensure the continuation of critical End User Compute Services (EUCS) used by MoJ staff every day, and implement a future-fit model for MoJ users. In order to achieve the future state, there are 3 EUCS streams: 1) The management of 3 re-procurements of EUCS suitable for the current and future needs of MoJ; 2) insource EUCS activity to bring certain capabilities in-house, and 3) migrate users on the legacy FITS services to the organisation's MoJ Official (MoJo) service.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25-Q4, the NISTA Delivery Confidence Assessment (DCA) rating has remained at Green. This is primarily due to successful progression through key procurement exercises, and ongoing confidence in planned delivery.","startDate":"2021-09-27","endDate":"2026-10-15","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end date at 25/26-Q4 changed from 27/03/26 to 15/10/26. This is primarily due to the increased time required to manage the transition between services, and increased contingency based on insights from lessons learned.","fyBaseline":61.62,"fyForecast":38.28,"fyVariance":37.88,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to reduced running costs due to a delay in service stand up and less expenditure on devices than planned.","wholeLifeCost":190.18,"costNarrative":"Compared to financial year 24/25-Q4, The Whole Life Cost has decreased from £193.31m to £190.18m. The budget remains aligned to the current baseline business case. All costs have been reported in 2024/25 base prices in line with NISTA requirements. This is a change from previous years where costs were reported in nominal prices. All costs reflect this accounting reduction regardless of any actual changes.","benefits":27.39,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's Benefits have decreased. However, this is only due to the new NISTA requirement to reflect costs and benefits in 2024/25 base prices, not because monetised benefits have decreased. Forecasted monetised benefits remain in line with the project's business case.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 24/25-Q4, the NISTA Delivery Confidence Assessment (DCA) rating has remained at Green. This is primarily due to successful progression through key procurement exercises, and ongoing confidence in planned delivery. Compared to financial year 24/25-Q4, the project's end date at 25/26-Q4 changed from 27/03/26 to 15/10/26. This is…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"MOJ_0062_2122-Q3","year":2025,"name":"Evolve: End User Computer Service (EUCS)","department":"MoJ","category":"ICT","description":"Project Brief Description: Ensure the continuation of critical End User Compute Services (EUCS) used by MoJ staff every day, and Implement an EUCS Future State model, which is crucial to achieving the strategic objective of a single technology ecosystem to all 110k MoJ users. In order to achieve the future state, there are 3 EUCS streams 1) The management of 3 re-procurements of EUCS suitable for the current and future needs of the Authority covering EUCS Platform & Legacy services, Hardware Sourcing and Hardware Support Services, 2) EUCS Insourcing to bring certain capabilities in-house, 3) Converge & Accelerate focuses on the migrating users on the legacy Future IT Services to the organisations service MoJ Official.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors‚ The schedule was re-baselined following validation of the procurement approach and is now on track for delivery.","startDate":"2021-09-27","endDate":"2026-03-27","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 30/11/2025 to 27/03/2026. This is primarily due to the following factors‚ The schedule was re-baselined following validation of the procurement approach.","fyBaseline":38.83,"fyForecast":47.85,"fyVariance":23.23,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The overspend is mainly due to the early utilisation of the new contracts.","wholeLifeCost":193.31,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 340 to 193. This is primarily due to the following factors‚ The increase reflects significant savings following approval of Full Business Case.","benefits":28.9,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 0 to 28.90. This is primarily due to the following factors‚ Confirmation of monetisation of benefits following approval of Full Business Case.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors‚ The schedule was re-baselined following validation of the procurement approach and is now on track for delivery. Compared to financial year 23/24-Q4, the…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":202,"attentionScore":24,"attentionReasons":["Published end date moved 202 days later","In-year forecast variance is +37.9%"]},{"id":"MOD_0116_1718-Q2","year":2026,"name":"FLEET SOLID SUPPORT","department":"MOD","category":"Military Capability","description":"Fleet Solid Support will deliver three auxiliary ships to provide stores, ammunition and food sustainment to Naval Forces at Sea.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors. 1. The Fleet Solid Support programme has continued to make steady progress in the 2025/6 reporting year with the Critical Design Review milestone achieved in late 2025 ahead of formal cut steel for RFA Resurgent (ship 1) on 03 Dec 25. 2. The programme is now firmly in production with blocks started at three of the build locations. Navantia UK understanding and growth of capability at the yards they now operate, post Harland and Wolff takeover, has progressed. 3. The major part of the infrastructure investment agreed as part of the FSS contract is now nearing completion. 4. Areas of concern remain the supply chain, team resourcing and the longer-term issue of the crewing of the ships which at present will likely slow the entry into service","startDate":"2016-03-14","endDate":"2033-07-28","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same at 31/03/2033.","fyBaseline":285.51,"fyForecast":334.12,"fyVariance":17.02,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. 1. The In Year variance (over-spend) is driven by the contractor regaining pace against the milestone payment plan that has lagged in previous years. This is particularly the case where the infrastructure investment that had stalled before the Navantia UK takeover of Harland and Wolff, is now nearing completion for the major elements including the automated panel line.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Delivery & schedule","Cost & funding","Commercial & supply chain","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors. 1. The Fleet Solid Support programme has continued to make steady progress in the 2025/6 reporting year with the Critical Design Review milestone achieved in late 2025 ahead of formal…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"MOD_0116_1718-Q2","year":2020,"name":"Fleet Solid Support","department":"MOD","category":"Military Capability","description":"Auxiliary Shipping to provide stores, ammunition and food sustainment to Naval Forces at Sea.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber, which has not changed since last year�s Q2 1819 Amber, due primarily to the following factors; - Delivery forecast at Q2 was Amber, however cancelation of the competition means Design and Manufacture contract will not be awarded in 2020. The programme is currently undergoing a period of review and reset.","startDate":"2016-04-01","endDate":"2030-04-30","scheduleNarrative":"The scheduled baseline project end date at Q2 1920 (30th September 2019) is 30/04/30, has not changed since last year's Q2 1819 date of 30/04/30, due primarily to the following factors; - On 5 November 2019 the Secretary of State for Defence agreed that the Fleet Solid Support ship competition should be stopped because it had become clear that a value for money solution could not be reached. The Department is now considering the most appropriate way forward for the Fleet Solid Support Programme. It is too early to say what impact stopping the competition might have on the entry into service of the Fleet Solid Support ships. This will be reviewed as part of our work to develop a way forward.","fyBaseline":0.66,"fyForecast":0.66,"fyVariance":0.0,"varianceNarrative":"Budget variance less than 5%","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests)","benefits":null,"benefitsNarrative":"","themes":["Commercial & supply chain","Delivery & schedule","Scope & requirements","Cost & funding"],"evidenceExcerpt":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber, which has not changed since last year�s Q2 1819 Amber, due primarily to the following factors; - Delivery forecast at Q2 was Amber, however cancelation of the competition means Design and Manufacture contract will not be awarded in 2020. The programme is…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2020","sourceLabel":"IPA Annual Report 2019-20"},{"id":"MOD_0116_1718-Q2","year":2021,"name":"Fleet Solid Support","department":"MOD","category":"Military Capability","description":"Fleet Solid Support will provide Auxiliary Shipping for stores, ammunition and food sustainment to Naval Forces at Sea.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating increased from Amber to Amber/red. This is primarily due to the following factors: a Programme re-set, including approval for a revised Outline Business Case following the cancellation of the Fleet Solid Support competition in October 2019. Progress has continued spanning the reporting period, achieving a number of key activities and advancing through the approvals that are required to enable a new procurement to start in 2021, as announced publicly and directed by the Secretary of State for Defence on 21 October 2020. The Outline Business Case was considered and passed through Navy Command and Defence Equipment & Support assurance processes in November 2020 and completed Investment Approvals Committee consideration as expected in December 2020. As of 31 March 21, the final Departmental approval is still awaited. This approval will enable the new competition to commence, with the internal project and commercial aspects in place and ready to proceed. Delivery confidence remains under constant review.","startDate":"2016-04-01","endDate":"2030-04-30","scheduleNarrative":"Compared to financial year 19/20-Q2, the project's end-date remained scheduled to finish on 30 April 2030 . This is primarily due to the following factors:","fyBaseline":0.3,"fyForecast":0.28,"fyVariance":-7.0,"varianceNarrative":"The budget variance exceeds 5%. The 20/21 budget was underspent by 7% as a result of directed Departmental savings (which reduced the original budget) and committal blight during this exercise. There was no detrimental impact to the programme as this was accounted for in the subsequent reset.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"","themes":["Approvals & decisions","Cost & funding","Commercial & supply chain","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating increased from Amber to Amber/red. This is primarily due to the following factors: a Programme re-set, including approval for a revised Outline Business Case following the cancellation of the Fleet Solid Support competition in October 2019.…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21"},{"id":"MOD_0116_1718-Q2","year":2022,"name":"Fleet Solid Support","department":"MOD","category":"Military Capability","description":"Fleet Solid Support will provide Auxiliary Shipping for stores, ammunition and food sustainment to Naval Forces at Sea.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating increased from Amber/Red to Amber. This is primarily due to the following factors: The removal of the incremental Amber/Red and Amber/Green assessment ratings. A recent Infrastructure and Projects Authority targeted assurance review acknowledged the progress made in addressing the challenges noted in earlier reviews with regards to the complexity of delivering defence capabilities and leaving a lasting legacy to enhance future UK shipbuilding productivity, all for an affordable cost. It concluded that the Programme continues to maximise its use of resources to generate and optimise opportunities to provide the best route to a successful procurement outcome.","startDate":"2016-04-01","endDate":"2030-04-30","scheduleNarrative":"Compared to 2021-Q4 the project end-date remained scheduled to finish on 30 April 30.","fyBaseline":21.0,"fyForecast":13.0,"fyVariance":-38.0,"varianceNarrative":"The budget variance exceeds 5%. The 21/22 budget was 'under-spent' by 33% as a result of the Competitive Procurement Phase requiring re-profiling to reflect a delay to the planned start of this phase. This has resulted in some payment milestones slipping from one Financial Year to the next. This will translate into an equivalent adjustment in Financial Year 22/23.","wholeLifeCost":null,"costNarrative":"Exempt - Under Section 43 of the Freedom of Information Act 2000 - Commercial Considerations","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating increased from Amber/Red to Amber. This is primarily due to the following factors: The removal of the incremental Amber/Red and Amber/Green assessment ratings. A recent Infrastructure and Projects Authority targeted assurance review acknowledged…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"MOD_0116_1718-Q2","year":2023,"name":"Fleet Solid Support","department":"MOD","category":"Military Capability","description":"Auxiliary Shipping to provide stores, ammunition and food sustainment to Naval Forces at Sea.","ipaDca":"Green","sroDca":null,"deliveryConfidence":"Green","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 increased from Amber to Green. This is primarily due to the following factors. The Programme has concluded the manufacture contract competition, submitted and gained approval of the Full Business Case and subsequently awarded the prime contract.","startDate":"2016-03-14","endDate":"2033-03-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 increased from 2030-04-30 to 2033-03-31. This is primarily due to the following factors. The approval of the Full Business Case has enabled the schedule to be re-baselined and the Programme end date to align to the end of final budgetary approved year.","fyBaseline":71.05,"fyForecast":69.57,"fyVariance":-2.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This programme does not report cashable benefits. Its aim is to provision the armed forces with the equipment and / or infrastructure required.","themes":["Approvals & decisions","Commercial & supply chain","Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 increased from Amber to Green. This is primarily due to the following factors. The Programme has concluded the manufacture contract competition, submitted and gained approval of the Full Business Case and subsequently awarded the…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"MOD_0116_1718-Q2","year":2024,"name":"Fleet Solid Support","department":"MOD","category":"Military Capability","description":"Auxiliary Shipping to provide stores, ammunition and food sustainment to Naval Forces at Sea.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure and Projects Authority's Delivery Confidence Assessment rating at 23/24-Q4 decreased from Green to Amber. This is primarily due to the following factors. Since contract award in January 23, the project has been mobilising at pace to maintain the tight schedule to delivery. The prime contractor with the other members of Team Resolute are actively recruiting to build capability and capacity, with physical delivery focused on infrastructure investment and competing major sub-contracts for ship equipment. The reduction in DCA reflects the challenges recognised in maintaining a tight schedule against a difficult supply chain picture, post contract safety regulatory driven change and internal and external workforce retention and growth issues.","startDate":"2016-03-14","endDate":"2033-03-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the programme's end-date at 23/24-Q4 remained on schedule to finish 2033-03-31.","fyBaseline":248.95,"fyForecast":227.92,"fyVariance":-8.447,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. Reprofiling across the programme which reflects the latest forecasting, factoring in a slight delay in achieving sub-contracting milestones and an adjustment to delivery of Government Furnished Equipment to align with the prime contract schedule.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.)","benefits":0.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 0m.","themes":["Delivery & schedule","Commercial & supply chain","Cost & funding","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure and Projects Authority's Delivery Confidence Assessment rating at 23/24-Q4 decreased from Green to Amber. This is primarily due to the following factors. Since contract award in January 23, the project has been mobilising at pace to maintain the tight schedule to delivery. The prime contractor with the…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"MOD_0116_1718-Q2","year":2025,"name":"FLEET SOLID SUPPORT","department":"MoD","category":"Military Capability","description":"Auxiliary Shipping to provide stores, ammunition and food sustainment to Naval Forces at Sea.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Project's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER, compared with the Infrastructure and Projects Authority's assessment last year of AMBER. This is due to the following factors. The Fleet Solid Support (FSS) programme has continued to make steady progress with the first major milestone of Preliminary Design Review achieved in October 2024. The project now focuses on detailed design heading towards the start of construction which is planned for later this year. A significant risk materialised when it became apparent that the Harland & Wolff shipyards were in financial difficulty. Navantia UK confirmed their commitment to UK industry by securing a commercial deal to purchase the shipyards, thereby giving greater certainty of a successful delivery of the FSS contract. The impact on the overall programme schedule is currently being assessed. Areas of concern remain the supply chain, whilst internally team resourcing is a challenge with the longer-term issue of the crewing of the ships which at present will likely slow the entry into service.","startDate":"2016-03-14","endDate":null,"scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2033.","fyBaseline":286.7,"fyForecast":202.85,"fyVariance":29.24,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The inability to make some contractual payments due to delay in shipyard investment and the placing of some major sub-contracts whilst there was uncertainty over the Harland and Wolff solvency and ownership. This has been resolved through the Navantia UK purchase and progress is now being made toward these milestones.","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits","themes":["Delivery & schedule","Commercial & supply chain","Cost & funding","Scope & requirements"],"evidenceExcerpt":"The Project's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER, compared with the Infrastructure and Projects Authority's assessment last year of AMBER. This is due to the following factors. The Fleet Solid Support (FSS) programme has continued to make steady progress with the first major milestone of Preliminary Design Review achieved in October…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"MOD_0116_1718-Q2","year":2026,"name":"FLEET SOLID SUPPORT","department":"MOD","category":"Military Capability","description":"Fleet Solid Support will deliver three auxiliary ships to provide stores, ammunition and food sustainment to Naval Forces at Sea.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors. 1. The Fleet Solid Support programme has continued to make steady progress in the 2025/6 reporting year with the Critical Design Review milestone achieved in late 2025 ahead of formal cut steel for RFA Resurgent (ship 1) on 03 Dec 25. 2. The programme is now firmly in production with blocks started at three of the build locations. Navantia UK understanding and growth of capability at the yards they now operate, post Harland and Wolff takeover, has progressed. 3. The major part of the infrastructure investment agreed as part of the FSS contract is now nearing completion. 4. Areas of concern remain the supply chain, team resourcing and the longer-term issue of the crewing of the ships which at present will likely slow the entry into service","startDate":"2016-03-14","endDate":"2033-07-28","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same at 31/03/2033.","fyBaseline":285.51,"fyForecast":334.12,"fyVariance":17.02,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. 1. The In Year variance (over-spend) is driven by the contractor regaining pace against the milestone payment plan that has lagged in previous years. This is particularly the case where the infrastructure investment that had stalled before the Navantia UK takeover of Harland and Wolff, is now nearing completion for the major elements including the automated panel line.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Delivery & schedule","Cost & funding","Commercial & supply chain","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors. 1. The Fleet Solid Support programme has continued to make steady progress in the 2025/6 reporting year with the Critical Design Review milestone achieved in late 2025 ahead of formal…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"MOD_0116_1718-Q2","year":2025,"name":"FLEET SOLID SUPPORT","department":"MoD","category":"Military Capability","description":"Auxiliary Shipping to provide stores, ammunition and food sustainment to Naval Forces at Sea.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Project's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER, compared with the Infrastructure and Projects Authority's assessment last year of AMBER. This is due to the following factors. The Fleet Solid Support (FSS) programme has continued to make steady progress with the first major milestone of Preliminary Design Review achieved in October 2024. The project now focuses on detailed design heading towards the start of construction which is planned for later this year. A significant risk materialised when it became apparent that the Harland & Wolff shipyards were in financial difficulty. Navantia UK confirmed their commitment to UK industry by securing a commercial deal to purchase the shipyards, thereby giving greater certainty of a successful delivery of the FSS contract. The impact on the overall programme schedule is currently being assessed. Areas of concern remain the supply chain, whilst internally team resourcing is a challenge with the longer-term issue of the crewing of the ships which at present will likely slow the entry into service.","startDate":"2016-03-14","endDate":null,"scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2033.","fyBaseline":286.7,"fyForecast":202.85,"fyVariance":29.24,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The inability to make some contractual payments due to delay in shipyard investment and the placing of some major sub-contracts whilst there was uncertainty over the Harland and Wolff solvency and ownership. This has been resolved through the Navantia UK purchase and progress is now being made toward these milestones.","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits","themes":["Delivery & schedule","Commercial & supply chain","Cost & funding","Scope & requirements"],"evidenceExcerpt":"The Project's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER, compared with the Infrastructure and Projects Authority's assessment last year of AMBER. This is due to the following factors. The Fleet Solid Support (FSS) programme has continued to make steady progress with the first major milestone of Preliminary Design Review achieved in October…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":null,"attentionScore":24,"attentionReasons":["Current published delivery confidence is Amber","In-year forecast variance is +17.0%"]},{"id":"HO_0039_1920-Q4","year":2026,"name":"FUTURE BORDER AND IMMIGRATION SYSTEM PROGRAMME (FBIS)","department":"HO","category":"Government Transformation and Service Delivery","description":"FBIS is transforming The UK’s border and immigration system into a streamlined, digital system which benefits our customers, enhances the security of the UK and prevents abuse of the system. The programmes top priorities include delivering eVisas, Electronic Travel Authorisation (ETAs), Routes and Applications Transformation and Border Vision.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the ongoing key risk in the plan; limited contingency. Any significant slippage will need clear prioritisation decisions.","startDate":"2018-04-01","endDate":"2027-03-31","scheduleNarrative":"Compared with Q4 2024/25, the project’s end date at Q4 2025/26 remains unchanged at 31 March 2027. This reflects the position set out in the latest Programme Business Case, which did not seek to extend the approved delivery timeframe. The programme maintains a clear understanding of its scope and has established delivery plans to realise its intended benefits.","fyBaseline":1068.87,"fyForecast":1262.26,"fyVariance":18.09,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to optimism bias and contingency, included in the baseline, was not required.","wholeLifeCost":5140.89,"costNarrative":"Compared with Q4 2024/25, the programme’s departmentally agreed Whole Life Cost at Q4 2025/26 has increased from £4,536m to £5,556m. This reflects the inclusion of running costs through to 2035/36, as well as cost increases across the period 2026/27 to 2034/35. The most significant increases in running costs are associated with Home Office Digital and Customer Services, reflecting updated delivery assumptions and the ongoing operation of the service.","benefits":13047.81,"benefitsNarrative":"Compared with Q4 2024/25, the programme’s departmentally agreed benefits at Q4 2025/26 (measured in £m) have decreased from £13,681m to £13,208m. This reflects the approval of the FBIS Programme Business Case (PBC) 2025 by HM Treasury in July 2025, which reset the departmental baseline for benefits from FY 2025/26 onwards. As part of the updated business case, a number of benefits previously included in the PBC 2024 baseline were treated as realised or sunk. This includes areas such as eVisa operational efficiencies, Detention and Workforce operational efficiencies, commercial savings, and reductions in eVisa call centre demand. As a result, these benefits are no longer reflected in the forward-looking baseline reported through GMPP, leading to an overall reduction in the total benefits figure.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the ongoing key risk in the plan; limited contingency. Any significant slippage will need clear prioritisation decisions. Compared with Q4 2024/25, the project’s end date at Q4 2025/26 remains unchanged at 31…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"HO_0039_1920-Q4","year":2021,"name":"Future Border and Immigration System Programme","department":"HO","category":"Government Transformation and Service Delivery","description":"The UK exited the European Union on 31 January 2020. From 1 January 2021 free movement ended and was replaced by a new points based immigration system. The Future Border and Immigration System (FBIS) will enable the UK to take back control of our border; it will simplify, enable and digitise our systems to put customers at the heart of a firmer, fairer and easier to navigate border and immigration system.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber/red.This is primarily due to the following factors: Programme confidence was assessed as Amber/Red in January 2021 by the Infrastructure and Projects Authority (IPA) assessment with a clear set of recommendations to move to an Amber rating by the end of the summer 2021. Work is underway to address these recommendations on scope, the development of the business case, articulating benefits, updating the Senior Responsible Owner (SRO) letters to reflect how the programme has moved on, dependencies and resources. The programme is now working to a new baselined delivery plan and resource plan and intends to publish a Strategy Statement setting out the scope in detail.","startDate":"2018-04-01","endDate":"2025-03-31","scheduleNarrative":"The project end-date is 31 March 2025. This is primarily due to the following factors: The programme successfully delivered the Points Based System last year before the end of freedom of movement on 31 December 2020. The programmes plans going forward are set out in a strategy statement which includes the key upcoming deliverables for 2021/22 and the vision for the border and immigration system to the end of 2024. This combines the programmes commitment to delivering a strong customer experience through a simplified, streamlined, user-centric system with how we will improve control by knowing who is coming in the UK and leaving, whilst increasing compliance.","fyBaseline":177.5,"fyForecast":149.65,"fyVariance":-16.0,"varianceNarrative":"The budget variance exceeds 5%. Underspends are largely a result of reduced demand resulting from COVID-19 restrictions. This has meant less case working has been required on cases; and less communication activity taking place.","wholeLifeCost":3344.55,"costNarrative":"The projects Baseline Whole Life Cost is �3344.55m. This is primarily due to the following factors: Costs are for the development and implementation of the United Kingdom's Future Border and Immigration System; as well as the running costs for the additional demand as a result of the new system. The baseline Whole Life Costs provided here have been created by bringing together material from different business cases. 2020/21 baselines have been derived from the Outline Business Case (OBC) approved by Treasury in March 2020 (with an adjustment made of �15.5m underspend due to reduced demand). Baselines from 2021/22 and beyond have been taken from a departmentally approved Programme Business Case produced in Autumn 2020.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Scope & requirements"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber/red.This is primarily due to the following factors: Programme confidence was assessed as Amber/Red in January 2021 by the Infrastructure and Projects Authority (IPA) assessment with a clear set of recommendations to move to an Amber rating by the end of the summer 2021.…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21"},{"id":"HO_0039_1920-Q4","year":2022,"name":"Future Border and Immigration System Programme","department":"HO","category":"Government Transformation and Service Delivery","description":"The United Kingdom exited the European Union on 31 January 2020. From 1 January 2021 free movement ended and was replaced by a new points based immigration system. The Future Border and Immigration System will enable the United Kingdom to take back control of our border, it will simplify, enable and digitise our systems to put customers at the heart of a firmer, fairer and easier to navigate border and immigration system.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 decreased from Amber/red to Amber. The programme received a delivery confidence rating of Amber for the whole of the programme following the last Infrastructure & Projects Authority Review (July 21). We have taken a number of actions recommended by the Infrastructure & Projects Authority, including reviewing how strategic intent for the Enable pillar is framed through establishing the Enable Board where stakeholders agreed the role and scope of Enable (11/10/21). We also clarified and documented plans for the transition of completed projects and products into the \"business as usual\" operating environment, formulating a Transition Team alongside resourcing changes and funding work to ensure projects/products are subject to normal budget planning processes once in business as usual.","startDate":"2018-04-01","endDate":"2025-03-31","scheduleNarrative":"Compared to 2021-Q4, your project end-date remained scheduled to finish on 31 MAR 2025 . This is primarily due to the following factors: Compared to 2021-Q4, programme end-date remained scheduled to finish on 31 March 2025. This is primarily due to the programmes flexible approach in relation to delivery which has seen the re-prioritisation of programme deliverables resulting in continued successful delivery throughout 21/22. We do however continue to see additions to the plan because of the ever-changing political climate (Ukraine, Plan for Growth, ongoing discussion on net migration and the operation of the points-based system, etc). Currently the programme finish date hasn't change but continued additions to scope is increasing the risk delivery timescales if this continues.","fyBaseline":233.4,"fyForecast":170.74,"fyVariance":-27.0,"varianceNarrative":"The budget variance exceeds 5%. At the start of the 21/22 financial year, the programme quickly identified a £27m budget surplus that was released to support broader portfolio priorities. A further £33m reduction was identified in Period 8 comprised of reductions in communications forecasts linked to the pandemic, lower operating costs and corresponding IT run costs. At Period 11 the net position had improved as demand and associated income increased. Capital spend was lower than envisaged resulting in £19m returned centrally to support pressures elsewhere in MBG","wholeLifeCost":3357.0,"costNarrative":"Compared to2021-Q4, the projects Baseline Whole Life Cost increased from 3344.55 (£m) to 3356.90 (£m). This is primarily due to the following factors: Costs are for the development and implementation of the United Kingdom's Future Border and Immigration System; as well as the running costs for the additional demand as a result of the new system.Figures up to and including 21/22 are based on actual expenditure and end year forecasts. 22/23 figures are based on spending review controls and baselines from 23/24 and beyond have been taken from a departmentally approved Programme Business Case produced in Autumn 2021.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 decreased from Amber/red to Amber. The programme received a delivery confidence rating of Amber for the whole of the programme following the last Infrastructure & Projects Authority Review (July 21). We have taken a number of actions…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"HO_0039_1920-Q4","year":2023,"name":"Future Border and Immigration System Programme","department":"HO","category":"Government Transformation and Service Delivery","description":"The United Kingdom exited the European Union on 31 January 2020. From 1 January 2021, free movement ended and was replaced by a new points based immigration system. The Future Border and Immigration System will enable the United Kingdom to take back control of our border, it will simplify, enable and digitise our systems to put customers at the heart of a firmer, fairer and easier to navigate border and immigration system.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber (SRO rating). This is primarily due to the following factors. The programme received a delivery confidence rating of Amber for the whole of the programme following an Independent Review (September 2022). The programme have looked to address a number of actions following the review, including reviewing how strategic intent for the Enable pillar is framed through establishing the Enable Board where stakeholders agreed the role and scope of Enable. The programme has also clarified and documented plans for the transition of completed projects and products into the business as usual operating environment, formulating a Transition Team alongside resourcing changes and funding work to ensure projects/products are subject to normal budget planning processes once in business as usual.","startDate":"2018-04-01","endDate":"2025-03-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2025-03-31. This is primarily due to the following factors. Compared to 2022-Q4, programme end-date remained scheduled to finish on 31 March 2025. This is primarily due to the programmes flexible approach in relation to delivery which has seen the re-prioritisation of programme deliverables resulting in continued successful delivery throughout 21/22. We do however continue to see additions to the plan because of the ever-changing political climate (Ukraine, Plan for Growth, ongoing discussion on net migration and the operation of the points-based system, etc). Currently the programme finish date hasnt change but continued additions to scope is increasing the risk delivery timescales if this continues.","fyBaseline":404.0,"fyForecast":273.2,"fyVariance":-32.0,"varianceNarrative":"The budget variance exceeds 5%. Optimism bias and contingency totalling 71m that was removed as part of spending review allocation. This results in the programme showing a larger under spend vs baseline than actual budget. In-year budgets were reduced by 10m in line with Optimus savings in Q1 and further savings have been identified with Digital Data and Technology Capital Departmental Expenditure Limit project lines, programme resource and Comms Media & Marketing through in year re forecasts. FBIS continues to take a proactive approach to managing underspends and addressing optimism bias in workforce plans. At P06 it was agreed that forecasts would reduce by a further 31m to return funds centrally early and ensure programme budgetary governance remains robust. The programme continues to deliver against key milestones despite taking on additional scope.","wholeLifeCost":3428.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 increased from 3357m. to 3428m. This is primarily due to the following factors. Costs are for the development and implementation of the United Kingdoms Future Border and Immigration System; as well as the running costs for the additional demand as a result of the new system.Figures up to and including 22/23 are based on actual expenditure and end year forecasts. Baselines from 23/24 and beyond have been taken from a departmentally approved Programme Business Case produced in Autumn 2021. The FBIS Business Case is due to be refreshed in April 2023 and the GMPP will be refreshed with latest figures in Q1 of 23/24.","benefits":40905.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 40905m. The project's departmental-agree monetised benefits at 22/23-Q4 is 40905m. The Programme will help to deliver a range of benefits to its customers, the Home Office, UK economy and wider international economy. The Simplify Pillar will continue to deliver a simplified immigration process through the improvement of existing routes and introduction of new ones and the delivery of a digital, simplified, and modern sponsorship system that enables a more efficient operation for users.The Enable pillar will transform the customer and caseworker experience through implementing and enabling digital systems. Modern services and aligned customer and caseworker capacities are vital for the successful delivery of the Programme and enhancing border security.The Digitise Pillar will utilise technology to improve border security. This will be achieved through watch listing and analytics to identify at risk persons before they arrive to the UK. This Pillars aim is to create an end state of contactless border, where passports and documents are replaced by biometrics.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Technical & integration"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber (SRO rating). This is primarily due to the following factors. The programme received a delivery confidence rating of Amber for the whole of the programme following an Independent Review (September 2022). The programme have looked to address a number…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"HO_0039_1920-Q4","year":2024,"name":"Future Border and Immigration System Programme","department":"HO","category":"Government Transformation and Service Delivery","description":"The United Kingdom exited the European Union on 31 January 2020. From 1 January 2021, free movement ended and was replaced by a new points based immigration system. The Future Border and Immigration System will enable the United Kingdom to take back control of our border, it will simplify, enable and digitise our systems to put customers at the heart of a firmer, fairer and easier to navigate border and immigration system.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber(IPA rating). This is primarily due to the following factors. The programme received a delivery confidence rating of Amber for the whole of the programme following an Independent Review (January 2023). The programme has looked to address a number of actions following the review, including reviewing how Programme Board decision making includes impact statements of longer-term consequences associated with preferred option(s), strengthening the management of Dependencies and that FBIS carries out scenario planning exercises around the risk of the e-Visa deployment milestone being missed, as well as it happening as planned but with significant issues.","startDate":"2018-04-01","endDate":"2025-03-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2025-03-31. This is primarily due to the following factors. A new programme end date of 31/03/27 has been agreed by the Programme Board. This is to maximise the benefits of the programme by facilitating full eVisa, ETA and sponsorship delivery. This is yet to be approved by InvestCo and HMT. Therefore, formally agreed end date of the programme is 31/03/25. The FBIS programme continues to see additions to the plan because of the ever-changing political climate (Ukraine, Plan for Growth, ongoing discussion on net migration and the operation of the points-based system, etc.","fyBaseline":446.0,"fyForecast":383.3,"fyVariance":-14.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. FBIS Tdel budgets for the full year is 107.7m, having increased from 58m since the start of the financial year. This increase was mainly due to receiving 46m of IMA funding._x000D_ _x000D_ IMA funding was to support the impact of IMA on technical capacity within FBIS and the need to reprioritise some deliverables._x000D_ _x000D_ There was a 2.7m increase in P7, transferring budget from Asylum Protection Transformation Programme, in relation to MAB work that was identified as FBIS._x000D_ _x000D_ Rdel budget increased by 0.5m (MAB) and 10.7m (IMA) to 181m._x000D_ _x000D_ Cdel budget increased by 2.2m (MAB) and 35.4m (IMA) to 196.7m._x000D_ _x000D_ Income budget of 270m remained the same throughout the year. P12 forecast was 450m, the increase was mainly due to higher demand in the Graduate route._x000D_ _x000D_ Tight forecasting controls have been in place since the start of the year. We are currently under spending on cdel due to reprioritising on some deliverable and better assumptions around costs.","wholeLifeCost":3428.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 remained at 3428m. This is primarily due to the following factors. Costs are for the development and implementation of the United Kingdom's Future Border and Immigration System; as well as the running costs for the additional demand because of the new system. Figures up to and including 23/24 are based on actual expenditure and end year forecasts. Baselines from 24/25 have been taken from Programme Business Case produced in Autumn 2021 and approved by HMT. The FBIS Business Case was refreshed during 2023 and will be submitted to InvestCo in April 24 and HMT in due course.","benefits":40967.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 2324-Q4 increased from 40905m. to 40967m. The Programme will help to deliver a range of benefits to its customers, the Home Office, UK economy and wider international economy. _x000D_ The Simplify Pillar will continue to deliver a simplified immigration process through the improvement of existing routes and introduction of new ones and the delivery of a digital, simplified, and modern sponsorship system that enables a more efficient operation for users._x000D_ The Enable pillar will transform the customer and caseworker experience through implementing and enabling digital systems. Modern services and aligned customer and caseworker capacities are vital for the successful delivery of the Programme and enhancing border security._x000D_ The Digitise Pillar will utilise technology to improve border security. This will be achieved through watch listing and analytics to identify at risk persons before they arrive to the UK. This Pillar's aim is to create an end state of 'contactless border', where passports and documents are replaced by biometrics.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber(IPA rating). This is primarily due to the following factors. The programme received a delivery confidence rating of Amber for the whole of the programme following an Independent Review (January 2023). The programme has looked to address a number of…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"HO_0039_1920-Q4","year":2025,"name":"FUTURE BORDER AND IMMIGRATION SYSTEM PROGRAMME (FBIS)","department":"HO","category":"Government Transformation and Service Delivery","description":"FBIS puts customers at the heart of a firmer, fairer and easier to navigate border and immigration system. The FBIS Programme has been established to lead the design and delivery of the future system, improving security, efficiency and customer experience. The programmes top priorities include delivering eVisas, Electronic Travel Authorisation (ETAs), Sponsorship and Border Vision.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The FBIS delivery plan is ambitious with limited contingency; changes to the scope of the programme caused by the Immigration White Paper or global events will require prioritisation decisions against exiting commitments. eVisa delivery currently remains the programme’s top priority. However, there is a risk that lack of Digital, Data and Technology (DDaT) delivery capability required for this.","startDate":"2018-04-01","endDate":"2027-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2025 to 31/03/2027. This is primarily due to the following factors‚ Programme extension was to March 2027 has been approved by Home Office Investment Committee (InvestCo) and HMT with a new Business Case. This was to facilitate full delivery and benefit realisation of eVisa, ETA, Sponsorship and Border Vision.","fyBaseline":579.0,"fyForecast":457.4,"fyVariance":21.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ Underspending within the Programme Directorate, specifically Caseworking Capability, led to the budget variance.","wholeLifeCost":4536.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 3428 to 4536. This is primarily due to the following factors‚ On 12th of November 2024, the Programme Business Case (PBC) was signed off by HM Treasury (HMT). As such, the baseline figures have been updated in line with this.","benefits":13681.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) decreased from 40967 to 13681. This is primarily due to the following factors‚ In Q4 of FY 2023/24, the most recent FBIS Programme Business Case (PBC) approved by HM Treasury (HMT) was the 2021 version, which formed the basis for the GMPP baseline benefits at that time. On 12 November 2024, HMT approved the updated PBC 2024. As a result, the GMPP baseline benefits were revised to align with the newly agreed figures. From FY 2024/25 to FY 2033/34, the benefit baselines now reflect the data set out in the PBC 2024. A key change in the updated baselines is the inclusion of the Electronic Travel Authorisation (ETA) disbenefit, which had not been baselined in the PBC 2021 and was therefore previously excluded from GMPP reporting. Another key change includes the Wider Socio-Economic Impact benefits, which were not baselined in the PBC 2024 as they have been delivered by the Programme so are deemed sunk and as such have been removed from the annual benefit baselines. This adjustment resulted in a reduction in the Wider UK Public Economic baseline from FY 2024/25 to FY 2030/31.","themes":["Cost & funding","Delivery & schedule","Technical & integration","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The FBIS delivery plan is ambitious with limited contingency; changes to the scope of the programme caused by the Immigration White Paper or global events will…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"HO_0039_1920-Q4","year":2026,"name":"FUTURE BORDER AND IMMIGRATION SYSTEM PROGRAMME (FBIS)","department":"HO","category":"Government Transformation and Service Delivery","description":"FBIS is transforming The UK’s border and immigration system into a streamlined, digital system which benefits our customers, enhances the security of the UK and prevents abuse of the system. The programmes top priorities include delivering eVisas, Electronic Travel Authorisation (ETAs), Routes and Applications Transformation and Border Vision.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the ongoing key risk in the plan; limited contingency. Any significant slippage will need clear prioritisation decisions.","startDate":"2018-04-01","endDate":"2027-03-31","scheduleNarrative":"Compared with Q4 2024/25, the project’s end date at Q4 2025/26 remains unchanged at 31 March 2027. This reflects the position set out in the latest Programme Business Case, which did not seek to extend the approved delivery timeframe. The programme maintains a clear understanding of its scope and has established delivery plans to realise its intended benefits.","fyBaseline":1068.87,"fyForecast":1262.26,"fyVariance":18.09,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to optimism bias and contingency, included in the baseline, was not required.","wholeLifeCost":5140.89,"costNarrative":"Compared with Q4 2024/25, the programme’s departmentally agreed Whole Life Cost at Q4 2025/26 has increased from £4,536m to £5,556m. This reflects the inclusion of running costs through to 2035/36, as well as cost increases across the period 2026/27 to 2034/35. The most significant increases in running costs are associated with Home Office Digital and Customer Services, reflecting updated delivery assumptions and the ongoing operation of the service.","benefits":13047.81,"benefitsNarrative":"Compared with Q4 2024/25, the programme’s departmentally agreed benefits at Q4 2025/26 (measured in £m) have decreased from £13,681m to £13,208m. This reflects the approval of the FBIS Programme Business Case (PBC) 2025 by HM Treasury in July 2025, which reset the departmental baseline for benefits from FY 2025/26 onwards. As part of the updated business case, a number of benefits previously included in the PBC 2024 baseline were treated as realised or sunk. This includes areas such as eVisa operational efficiencies, Detention and Workforce operational efficiencies, commercial savings, and reductions in eVisa call centre demand. As a result, these benefits are no longer reflected in the forward-looking baseline reported through GMPP, leading to an overall reduction in the total benefits figure.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the ongoing key risk in the plan; limited contingency. Any significant slippage will need clear prioritisation decisions. Compared with Q4 2024/25, the project’s end date at Q4 2025/26 remains unchanged at 31…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"HO_0039_1920-Q4","year":2025,"name":"FUTURE BORDER AND IMMIGRATION SYSTEM PROGRAMME (FBIS)","department":"HO","category":"Government Transformation and Service Delivery","description":"FBIS puts customers at the heart of a firmer, fairer and easier to navigate border and immigration system. The FBIS Programme has been established to lead the design and delivery of the future system, improving security, efficiency and customer experience. The programmes top priorities include delivering eVisas, Electronic Travel Authorisation (ETAs), Sponsorship and Border Vision.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The FBIS delivery plan is ambitious with limited contingency; changes to the scope of the programme caused by the Immigration White Paper or global events will require prioritisation decisions against exiting commitments. eVisa delivery currently remains the programme’s top priority. However, there is a risk that lack of Digital, Data and Technology (DDaT) delivery capability required for this.","startDate":"2018-04-01","endDate":"2027-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2025 to 31/03/2027. This is primarily due to the following factors‚ Programme extension was to March 2027 has been approved by Home Office Investment Committee (InvestCo) and HMT with a new Business Case. This was to facilitate full delivery and benefit realisation of eVisa, ETA, Sponsorship and Border Vision.","fyBaseline":579.0,"fyForecast":457.4,"fyVariance":21.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ Underspending within the Programme Directorate, specifically Caseworking Capability, led to the budget variance.","wholeLifeCost":4536.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 3428 to 4536. This is primarily due to the following factors‚ On 12th of November 2024, the Programme Business Case (PBC) was signed off by HM Treasury (HMT). As such, the baseline figures have been updated in line with this.","benefits":13681.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) decreased from 40967 to 13681. This is primarily due to the following factors‚ In Q4 of FY 2023/24, the most recent FBIS Programme Business Case (PBC) approved by HM Treasury (HMT) was the 2021 version, which formed the basis for the GMPP baseline benefits at that time. On 12 November 2024, HMT approved the updated PBC 2024. As a result, the GMPP baseline benefits were revised to align with the newly agreed figures. From FY 2024/25 to FY 2033/34, the benefit baselines now reflect the data set out in the PBC 2024. A key change in the updated baselines is the inclusion of the Electronic Travel Authorisation (ETA) disbenefit, which had not been baselined in the PBC 2021 and was therefore previously excluded from GMPP reporting. Another key change includes the Wider Socio-Economic Impact benefits, which were not baselined in the PBC 2024 as they have been delivered by the Programme so are deemed sunk and as such have been removed from the annual benefit baselines. This adjustment resulted in a reduction in the Wider UK Public Economic baseline from FY 2024/25 to FY 2030/31.","themes":["Cost & funding","Delivery & schedule","Technical & integration","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The FBIS delivery plan is ambitious with limited contingency; changes to the scope of the programme caused by the Immigration White Paper or global events will…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":0,"attentionScore":24,"attentionReasons":["Current published delivery confidence is Amber","In-year forecast variance is +18.1%"]},{"id":"DEFRA_0014_2021-Q4","year":2026,"name":"NO2 PROGRAMME","department":"DEFRA","category":"Infrastructure and Construction","description":"Government is legally mandated to deliver Nitrogen dioxide (NO2) compliance in the shortest possible time. The Joint Air Quality Unit delivers the NO2 Programme and is jointly accountable to Defra and DfT, including joint Ministerial, Senior Responsible Officer and funding responsibilities. The Programme collaborates with 64 local authorities to fund and deliver measures to secure compliant NO2 levels, including through Clean Air Zones alongside DVLA. National Highways is delivering measures targeting compliance on the Strategic Road Network.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA Delivery Confidence Assessment rating at 25/26 Q4 increased from RED to AMBER. This is primarily due to all the recommendations from the NISTA Gate 5 review having been addressed and evidenced and the programme being ready for transition to business as usual and coming off GMPP at the end of 25/26. Six were agreed as closed and the remaining two will be closed as part of final programme closure and transition activities. NISTA confirmed that the Programme was removed from the GMPP on 31 March.","startDate":"2016-01-01","endDate":"2026-03-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 was revised to 31/03/26. This is primarily due to funding constraints, lack of new measures, progress to date and wider improvements in vehicle fleet. Defra’s Investment Committee agreed in April 2025 to ‘careful closure’ of the programme, acknowledging the programme successes.","fyBaseline":15.13,"fyForecast":12.63,"fyVariance":16.52,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to delays in finalising remaining local authority clean air plans within the year, and savings resulting from negotiating cheaper air quality monitoring and modelling contracts. Also, lower revenue has been received from local authorities using the central Clean Air Zones service. The lower revenue represents a positive sign that NO2 measures are working because fewer non-compliant vehicles are driving through Clean Air Zones.","wholeLifeCost":843.04,"costNarrative":"Compared to financial year 24/25-Q4, the programme’s departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) decreased to 678. This was due to less funding being secured through the Spending Review and business planning rounds because the additional measures identified to date were unlikely to bring forward compliance with legal air quality limits. The reduced programme budget based on the SR25 settlement was £706m (£441m CDEL and £265m RDEL) over the SR period (up to FY29/30). The actual expenditure of the programme at the end of financial year 25/26 when it exited the GMPP is £678 million. This excludes the cost of measures to be agreed for Stoke’s Clean Air Plan. NO2 work which is carrying on through business-as-usual teams in Defra and DfT from FY26/27 onwards has budget allocation in line with 2025 Business Planning in both departments. This will not be reported in GMPP.","benefits":null,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to benefits not being monetised at programme level. Benefits assessment work is currently being undertaken, and a comprehensive evaluation programme is underway. A series of annual reports have been published on GOV.UK which demonstrate the progress and key findings from the evaluation.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA Delivery Confidence Assessment rating at 25/26 Q4 increased from RED to AMBER. This is primarily due to all the recommendations from the NISTA Gate 5 review having been addressed and evidenced and the programme being ready for transition to business as usual and coming off GMPP at the end of 25/26. Six were…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"DEFRA_0014_2021-Q4","year":2021,"name":"NO2 Reduction","department":"DEFRA & DFT","category":"Infrastructure and Construction","description":"The NO2 reduction programme is a joint programme with Department for Transport to deliver Nitrogen Dioxide (NO2) levels within legal limits in the shortest time possible. The NO2 reduction programme aims to deliver the 2017 UK plan for tackling roadside nitrogen dioxide concentrations and contributes to the Government ambition for a better environment and cleaner air.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Legal sensitivity�around this programme along with the impacts of COVID-19 re-prioritisation prevented the IPA from providing a complete�and independent�assessment.","startDate":"2016-01-01","endDate":"2027-12-31","scheduleNarrative":"The project end-date is 31 December 2027. This is primarily due to the following factors: The development of NO2 reduction plans in 2020 was impacted by COVID-19 and a number of local authorities have revised their schedules as a result. The first Clean Air Zone in Bath launched on 15 March 2021. The NO2 programme is legally mandated to deliver compliance with NO2 legal limits in the shortest time possible. The programme team works very closely with local authorities who have exceedances across England to develop and implement NO2 reduction plans.","fyBaseline":289.0,"fyForecast":151.5,"fyVariance":-48.0,"varianceNarrative":"The budget variance exceeds 5%. The NO2 programme is supporting Local Authorities to develop and implement measures to address NO2 roadside exceedances. Funding has been provided to Local Authorities to deliver the necessary reductions to tackle NO2 over the lifetime of the project. Due to COVID-19 there have been delays to local authority spending, resulting in an underspend.","wholeLifeCost":880.0,"costNarrative":"The projects Baseline Whole Life Cost is �880.00m. This is primarily due to the following factors: Programme costs relate to the development of NO2 reduction plans by local authorities who have exceedances, implementation of NO2 reduction plans, project costs for the central Clean Air Zone service, and modelling, monitoring and evaluation.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding"],"evidenceExcerpt":"Legal sensitivity�around this programme along with the impacts of COVID-19 re-prioritisation prevented the IPA from providing a complete�and independent�assessment. The project end-date is 31 December 2027. This is primarily due to the following factors: The development of NO2 reduction plans in 2020 was impacted by COVID-19 and a number of local…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21"},{"id":"DEFRA_0014_2021-Q4","year":2022,"name":"NO2 Programme","department":"DEFRA","category":"Infrastructure and Construction","description":"The NO2 reduction programme is a joint programme with Department for Transport to deliver the 2017 UK Plan for Tackling Roadside Nitrogen Dioxide Concentrations. The Plan outlines how councils with NO2 levels exceeding legal limits must develop and implement local plans to deliver legal levels of NO2 in the shortest time possible.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 decreased from Amber/red to Amber Overall good progress has been made against all six IPA actions. The SRO appointment letter for joint-SRO leadership is pending publication. Policy work continues with DfT National Highways (NH) client team to consider further options and mitigations to target NO2 exceedances on the Strategic Road Network. Resource capacity is regularly reviewed within the Programme by the Programme Director alongside the SROs. All communication products are under review expected in Spring 2022.","startDate":"2016-01-01","endDate":"2027-12-31","scheduleNarrative":"Compared to 2021-Q4, your project end-date remained scheduled to finish on 31 DEC 2027 . This is primarily due to the following factors: The NO2 programme is legally mandated to deliver compliance with NO2 legal limits in the shortest time possible. The programme team works with local authorities across England who have exceedances to develop and implement local NO2 reduction plans through a variety of interventions. Confidence in the launch and delivery of Clean Air Zones (CAZ) has increased following successful delivery of Bath and North East Somerset (BaNES), Birmingham and Portsmouth CAZs in 2021. In February 2022, Ministers granted permission for Greater Manchester to pause implementation of their CAZ and submit revised plans by July 2022. The programme team continue to work with Greater Manchester to continue engagement and meet legal obligations. The operational service ownership of the CAZ service successfully transitioned from JAQU to DVLA in February 2022.","fyBaseline":44.8,"fyForecast":43.8,"fyVariance":-2.0,"varianceNarrative":"The budget variance is inferior or equal to 5%. The NO2 programme is supporting local authorities to develop and implement measures to address NO2 roadside exceedances. Funding has been provided to local authorities to deliver the necessary reductions to tackle NO2 over the lifetime of the programme. There have been delays to local authority plans in 21/22 resulting in an underspend this year. The 21/22 baseline was updated in year, to reflect underspends as agreed with HMT and these figures were allowed for in SR21 budgets for the NO2 programme.","wholeLifeCost":885.0,"costNarrative":"Compared to2021-Q4, the projects Baseline Whole Life Cost increased from 880.00 (£m) to 884.80 (£m). This is primarily due to the following factors: Compared to 2021-Q4, the projects Baseline Whole Life Cost increased from 880.00 (£m) to 884.48 (£m). This is due to rounding rather than an increase in costs.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 decreased from Amber/red to Amber Overall good progress has been made against all six IPA actions. The SRO appointment letter for joint-SRO leadership is pending publication. Policy work continues with DfT National Highways (NH)…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"DEFRA_0014_2021-Q4","year":2023,"name":"NO2 Programme","department":"DEFRA","category":"Infrastructure and Construction","description":"The NO2 reduction programme is a joint programme with the Department for Transport to deliver the 2017 UK Plan for Tackling Roadside Nitrogen Dioxide Concentrations. The Plan outlines how councils with NO2 levels exceeding legal limits must develop and implement local plans to deliver legal levels of NO2 in the shortest time possible.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. Good progress has made against all previous IPA recommendations. The most recent IPA review of the programme was in March 2023 and actions against each recommendation from this review are being taken forward. Overall the NO2 Programme continues to deliver mitigations alongside Local Authorities and remains at Amber.","startDate":"2016-01-01","endDate":"2027-12-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2027-12-31. This is primarily due to the following factors. The NO2 programme is legally mandated to deliver compliance with NO2 legal limits in the shortest time possible. The programme team works with local authorities across England who have exceedances to develop and implement local NO2 reduction plans through a variety of interventions. In 2022/23 four further Clean Air Zones were successfully launched in Bradford, Bristol, Tyneside and Sheffield to help reduce NO2 levels in the cities. In February 2022, Ministers granted permission for Greater Manchester to pause implementation of their Clean Air Zone and submit revised plans. The programme team continues to work with Greater Manchester to continue engagement and meet legal obligations. Comprehensive monitoring and evaluation arrangements are in place to assess whether local authorities are on track to reduce NO2 levels in the timeframe expected and consider appropriate remedial action if they are not. The programme team also continues to work closely with National Highways to address NO2 exceedances on the Strategic Road Network.","fyBaseline":189.3,"fyForecast":43.4,"fyVariance":-77.0,"varianceNarrative":"The budget variance exceeds 5%. The NO2 programme is supporting local authorities to develop and implement measures to address NO2 roadside exceedances. Funding has been provided to local authorities to deliver the necessary reductions to tackle NO2 over the lifetime of the programme. There have continued to be delays in agreeing local authority plans resulting in an underspend this year. The 22/23 baseline was updated in year, to reflect underspends as agreed with HMT and these figures were allowed for in SR21 budgets for the NO2 programme.","wholeLifeCost":883.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 decreased from 885m. to 883m. This is primarily due to the following factors. 80 (m) to 883.00 (m). This is due to rounding rather than a decrease in costs.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. The project did not provide departmental-agree monetised benefits at 22/23-Q4.The project did not provide departmental-agree monetised benefits at 22/23-Q4.The project did not provide departmental-agree monetised benefits at 22/23-Q4. The primary benefit of the NO2 programme is reduced NO2 levels leading to a positive impact on public health. There is comprehensive monitoring and evaluation in place to track and manage the realisation of benefits from the programme.","themes":["Cost & funding","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. Good progress has made against all previous IPA recommendations. The most recent IPA review of the programme was in March 2023 and actions against each recommendation…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"DEFRA_0014_2021-Q4","year":2024,"name":"NO2 Programme","department":"DEFRA","category":"Infrastructure and Construction","description":"The NO2 reduction programme is a joint programme with the Department for Transport to deliver the 2017 UK Plan for Tackling Roadside Nitrogen Dioxide Concentrations. The Plan outlines how councils with NO2 levels exceeding legal limits must develop and implement local plans to deliver legal levels of NO2 in the shortest time possible.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 22/23-Q4, the Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber(SRO rating). This is primarily due to the following factors. Good progress has made against all previous IPA recommendations. The most recent IPA review of the programme was in March 2023 and actions against each recommendation from this review are being taken forward. The next IPA review will take place in April 2024. Overall the NO2 Programme continues to deliver mitigations alongside Local Authorities and remains at Amber.","startDate":"2016-01-01","endDate":"2027-12-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2027-12-31. This is primarily due to the following factors. The NO2 programme is legally mandated to deliver compliance with NO2 legal limits in the shortest time possible. The programme team works with local authorities across England who have exceedances to develop and implement local NO2 reduction plans through a variety of interventions. Seven Clean Air Zones have been launched as part of the programme to help reduce NO2 levels. In February 2022, Ministers granted permission for Greater Manchester to pause implementation of their Clean Air Zone and revised plans were submitted to Government in December 2023. The programme team will respond to Greater Manchester in due course. Comprehensive monitoring and evaluation arrangements are in place to assess whether local authorities are on track to reduce NO2 levels in the timeframe expected and consider appropriate remedial action if they are not. The programme team also continues to work closely with National Highways to address NO2 exceedances on the Strategic Road Network.","fyBaseline":43.5,"fyForecast":20.3,"fyVariance":-53.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The NO2 programme is supporting local authorities to develop and implement measures to address NO2 roadside exceedances. Funding has been provided to local authorities to deliver the necessary reductions to tackle NO2 over the lifetime of the programme. There have continued to be delays in agreeing local authority plans resulting in reprofiling of spend across years and a budget variance exceeding 5%. This has been managed in year with DfT and Defra finance teams. The programme remains within its overall budget envelope .","wholeLifeCost":883.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 remained at 883m. This is primarily due to the following factors. The projects Baseline Whole Life Cost remains at 883.00 (m).","benefits":0.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 0m. The primary benefit of the NO2 programme is reduced NO2 levels leading to a positive impact on public health. There is comprehensive monitoring and evaluation in place to track and manage the realisation of benefits from the programme.","themes":["Cost & funding","Governance & assurance","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber(SRO rating). This is primarily due to the following factors. Good progress has made against all previous IPA recommendations. The most recent IPA review of the programme was in March 2023 and actions against each recommendation from this review are…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"DEFRA_0014_2021-Q4","year":2025,"name":"NO2 PROGRAMME","department":"DEFRA","category":"Infrastructure and Construction","description":"Government is legally mandated to deliver Nitrogen dioxide (NO2) compliance in the shortest possible time. The Joint Air Quality Unit delivers the NO2 Programme and is jointly accountable to Defra and DfT, including joint Ministerial, Senior Responsible Officer and funding responsibilities. The Programme collaborates with 64 local authorities to fund and deliver measures to secure compliant NO2 levels, including through Clean Air Zones alongside DVLA. National Highways is delivering measures targeting compliance on the Strategic Road Network.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 decreased from AMBER to RED. This is primarily due to uncertainty surrounding future zero emission bus funding, as well as challenges in identifying additional measures within local authorities that are not currently on track to achieve compliance with NO2 limit levels in the timeframe expected.","startDate":"2016-01-01","endDate":"2027-12-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/12/2027. This is primarily due to the NO2 programme being legally mandated to deliver compliance with NO2 limit levels in the shortest time possible. The programme team works closely with local authorities who have exceedances across England to develop and implement NO2 reduction plans.","fyBaseline":12.4,"fyForecast":8.4,"fyVariance":32.26,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to delays in finalising remaining local authority clean air plans within the year. Also, lower revenue has been received from local authorities using the central Clean Air Zones service. However the lower revenue represents a positive sign that NO2 measures are working because fewer non-compliant vehicles are driving through Clean Air Zones.","wholeLifeCost":883.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 883. This is primarily due to the following factor‚ - the Whole Life Cost is subject to outcomes from the Spending Review and has remained at £883m until this is concluded.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to benefits not being monetised at programme level. Benefits assessment work is currently being undertaken and a comprehensive evaluation programme is underway. A series of annual reports have been published on gov.uk which demonstrate the progress and key findings from the evaluation.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 decreased from AMBER to RED. This is primarily due to uncertainty surrounding future zero emission bus funding, as well as challenges in identifying additional measures within local authorities that are not currently on track to…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"DEFRA_0014_2021-Q4","year":2026,"name":"NO2 PROGRAMME","department":"DEFRA","category":"Infrastructure and Construction","description":"Government is legally mandated to deliver Nitrogen dioxide (NO2) compliance in the shortest possible time. The Joint Air Quality Unit delivers the NO2 Programme and is jointly accountable to Defra and DfT, including joint Ministerial, Senior Responsible Officer and funding responsibilities. The Programme collaborates with 64 local authorities to fund and deliver measures to secure compliant NO2 levels, including through Clean Air Zones alongside DVLA. National Highways is delivering measures targeting compliance on the Strategic Road Network.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA Delivery Confidence Assessment rating at 25/26 Q4 increased from RED to AMBER. This is primarily due to all the recommendations from the NISTA Gate 5 review having been addressed and evidenced and the programme being ready for transition to business as usual and coming off GMPP at the end of 25/26. Six were agreed as closed and the remaining two will be closed as part of final programme closure and transition activities. NISTA confirmed that the Programme was removed from the GMPP on 31 March.","startDate":"2016-01-01","endDate":"2026-03-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 was revised to 31/03/26. This is primarily due to funding constraints, lack of new measures, progress to date and wider improvements in vehicle fleet. Defra’s Investment Committee agreed in April 2025 to ‘careful closure’ of the programme, acknowledging the programme successes.","fyBaseline":15.13,"fyForecast":12.63,"fyVariance":16.52,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to delays in finalising remaining local authority clean air plans within the year, and savings resulting from negotiating cheaper air quality monitoring and modelling contracts. Also, lower revenue has been received from local authorities using the central Clean Air Zones service. The lower revenue represents a positive sign that NO2 measures are working because fewer non-compliant vehicles are driving through Clean Air Zones.","wholeLifeCost":843.04,"costNarrative":"Compared to financial year 24/25-Q4, the programme’s departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) decreased to 678. This was due to less funding being secured through the Spending Review and business planning rounds because the additional measures identified to date were unlikely to bring forward compliance with legal air quality limits. The reduced programme budget based on the SR25 settlement was £706m (£441m CDEL and £265m RDEL) over the SR period (up to FY29/30). The actual expenditure of the programme at the end of financial year 25/26 when it exited the GMPP is £678 million. This excludes the cost of measures to be agreed for Stoke’s Clean Air Plan. NO2 work which is carrying on through business-as-usual teams in Defra and DfT from FY26/27 onwards has budget allocation in line with 2025 Business Planning in both departments. This will not be reported in GMPP.","benefits":null,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to benefits not being monetised at programme level. Benefits assessment work is currently being undertaken, and a comprehensive evaluation programme is underway. A series of annual reports have been published on GOV.UK which demonstrate the progress and key findings from the evaluation.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA Delivery Confidence Assessment rating at 25/26 Q4 increased from RED to AMBER. This is primarily due to all the recommendations from the NISTA Gate 5 review having been addressed and evidenced and the programme being ready for transition to business as usual and coming off GMPP at the end of 25/26. Six were…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"DEFRA_0014_2021-Q4","year":2025,"name":"NO2 PROGRAMME","department":"DEFRA","category":"Infrastructure and Construction","description":"Government is legally mandated to deliver Nitrogen dioxide (NO2) compliance in the shortest possible time. The Joint Air Quality Unit delivers the NO2 Programme and is jointly accountable to Defra and DfT, including joint Ministerial, Senior Responsible Officer and funding responsibilities. The Programme collaborates with 64 local authorities to fund and deliver measures to secure compliant NO2 levels, including through Clean Air Zones alongside DVLA. National Highways is delivering measures targeting compliance on the Strategic Road Network.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 decreased from AMBER to RED. This is primarily due to uncertainty surrounding future zero emission bus funding, as well as challenges in identifying additional measures within local authorities that are not currently on track to achieve compliance with NO2 limit levels in the timeframe expected.","startDate":"2016-01-01","endDate":"2027-12-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/12/2027. This is primarily due to the NO2 programme being legally mandated to deliver compliance with NO2 limit levels in the shortest time possible. The programme team works closely with local authorities who have exceedances across England to develop and implement NO2 reduction plans.","fyBaseline":12.4,"fyForecast":8.4,"fyVariance":32.26,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to delays in finalising remaining local authority clean air plans within the year. Also, lower revenue has been received from local authorities using the central Clean Air Zones service. However the lower revenue represents a positive sign that NO2 measures are working because fewer non-compliant vehicles are driving through Clean Air Zones.","wholeLifeCost":883.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 883. This is primarily due to the following factor‚ - the Whole Life Cost is subject to outcomes from the Spending Review and has remained at £883m until this is concluded.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to benefits not being monetised at programme level. Benefits assessment work is currently being undertaken and a comprehensive evaluation programme is underway. A series of annual reports have been published on gov.uk which demonstrate the progress and key findings from the evaluation.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 decreased from AMBER to RED. This is primarily due to uncertainty surrounding future zero emission bus funding, as well as challenges in identifying additional measures within local authorities that are not currently on track to…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":-1,"transition":"Improved","endDateDeltaDays":-640,"attentionScore":24,"attentionReasons":["Current published delivery confidence is Amber","In-year forecast variance is +16.5%"]},{"id":"MOD_0119_1920-Q2","year":2026,"name":"ARMED FORCES RECRUITING PROGRAMME","department":"MOD","category":"Military Capability","description":"The Armed Forces Recruiting Programme is the Tri-Service programme responsible for delivering a single, common Tri-Service Recruiting Operating Model for the Armed Forces. The Programme seeks to bring the three single Service recruiting activities together under one future recruiting service with a commercial partner and a single digital platform.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors. 1.The level of risk being carried with respect to the novel collaborative delivery of technical solution and data migration. 2. Delivery of some aspects of the service not progressing as initially planned, requiring joint risk mitigation and re-planning to be pursued. 3. Continued challenges in aggregating information to allow for improved tracking of progress against the delivery of this complex programme.","startDate":"2018-03-15","endDate":"2028-04-30","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same at 30/04/2028. This is primarily due to the following factors. 1. Timely approval of the Full Business Case and contract let with Team Serco that includes a phased transition from the contract becoming effective in April 2025 and allowing to progress to Full Solution Implementation in October 2027.","fyBaseline":50.89,"fyForecast":42.62,"fyVariance":16.24,"varianceNarrative":"The in-year variance exceeds 5%. This is primarily due to the following factors. 1. A review of FY25/26 forecast activity identified an £8.5M underspend generated by the the contingency provision not being required.","wholeLifeCost":201.02,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 has marginally increased from £194.96M to £195.05M. This is primarily due to the following factors. 1. The WLC figures include the Feasibility, Assessment and Transition phases. The funding for the Assessment phase reflected an earlier approval of funding plus civilian workforce costs which are not included in the original Approved Budgetary Level. 2. The AFRP Full Business Case was approved 31 January 2025 providing endorsement of a revised baseline of £2,258M for a 2-year transition period, 7 year core delivery contract and 3 x potential option years. £135.1M of this approval relates to the programme transition years, which have been included in the reported figures.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. There are no monetised benefits.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors. 1.The level of risk being carried with respect to the novel collaborative delivery of technical solution and data migration. 2. Delivery of some aspects of the service not progressing…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"MOD_0119_1920-Q2","year":2020,"name":"Armed Forces Recruitment Project","department":"MOD","category":"Military Capability","description":"The Armed Forces Recruiting Programme (AFRP) is the tri-Service (tS) programme responsible for delivering a single, common tS Recruiting Op Model for the Armed Forces.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber/Red, due primarily to the following factors; - The IPA Review DCA in March 19 acknowledged that progress had been made in developing deliverable options but the full scope of the programme was unachievable in the original mandated timeframe. - At the time of the IPA review DCA the programme was being re-baselined to reflect an achievable timeframe with the required additional resourcing, this gave enough confidence to reflect an Amber / Red confidence delivery. Since the Q2 1920 (30th September 2019) Amber/Red IPA DCA, the following non-project operating environment activities have impacted the original Q2 IPA DCA; - The Programme Assessment Review held in Oct 19 upgraded the review to Amber with a re-baseline of activity with a deliverable option for an Initial Operating Capability (IOC) of Mar 24. Since the Q2 1920 (30th September 2019) Amber/Red IPA DCA, the following primary project actions have impacted the original Q2 IPA DCA; - The Initial Gate Business Case has received IAC approval for an Initial Operating Capability revised schedule of Mar 24. Ministerial approval was granted in Mar 20 & Cabinet Office / HM Treasury Approval in May 20.","startDate":"2018-03-15","endDate":"2023-02-01","scheduleNarrative":"The scheduled project end date at Q2 1920 (30th September 2019) is 01/02/23, due primarily to the following factors; - The schedule of Initial Operating Capability in Feb 23 allowed 13 months for transition to Full Operating Capability of Mar 24. As highlighted in the DCA Review the timeline was unachievable and required re-baselining. - The schedule has been re-baselined contract let still remains as Mar 23 for an Initial Operating Capability of Mar 24, with Full Operating Capability to follow. Since the Q2 1920 (30th September 2019) baseline project end date of 01/02/23, the following non-project operating environment activities have impacted the original Q2 baseline project end date; - The Initial Gate Business Case has received Investment Approvals Committee approval for an Initial Operating Capability revised schedule of Mar 24. Ministerial approval was granted in Mar 20 & Cabinet Office / HM Treasury Approval in May 20.","fyBaseline":5.1,"fyForecast":5.1,"fyVariance":0.0,"varianceNarrative":"Budget variance less than 5%","wholeLifeCost":1730.24,"costNarrative":"The baseline Whole Life Cost at Q2 1920 (30th September 2019) is �1,730.24 m, due primarily to the following factors; - The programme has been directed to not exceed the current cost of the three current single Service systems.","benefits":null,"benefitsNarrative":"","themes":["Approvals & decisions","Workforce & capability","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber/Red, due primarily to the following factors; - The IPA Review DCA in March 19 acknowledged that progress had been made in developing deliverable options but the full scope of the programme was unachievable in the original mandated timeframe. - At the time of the…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2020","sourceLabel":"IPA Annual Report 2019-20"},{"id":"MOD_0119_1920-Q2","year":2021,"name":"Armed Forces Recruitment Programme","department":"MOD","category":"Military Capability","description":"The Armed Forces Recruiting Programme is the Tri-Service programme responsible for delivering a single, common Tri-Service Recruiting Operating Model for the Armed Forces.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating decreased from Amber/Red to Amber. This is primarily due to the following factors: The Armed Forces Recruiting Programme's previous Infrastructure and Projects Authority Gateway Assurance Review took place in June 2020 and resulting in an Amber/Red rating in Delivery Confidence. Following this the Armed Forces Recruiting Programme undertook an Assurance of Action Plan in November which resulted in a revised rating of Amber. Successful delivery appears feasible but three significant issues already exist requiring management attention but AFRP have an assured action plan to address them. - Commercial resourcing/integration; - Key Performance Iindicators development to frame the procurement; and, - Drawing the baseline cost model to completion (including cashability).","startDate":"2018-03-15","endDate":"2024-09-30","scheduleNarrative":"Compared to financial year 19/20-Q2, the project's end-date increased from 01 February 2023 to 30 September 2024 . This is primarily due to the following factors: The Defence Board directed change in the scope of the programme from a single Service to Tri-Service recruiting programme impacted on delivery dates. The Investment Approvals Commitee recommended in November 19 a delivery date move from April 22 to April 24, Project end-date is expected to be a minimum of 6 months after delivery based on lessons learned from other large outsourcing programmes within the Ministry of Defence.","fyBaseline":7.36,"fyForecast":7.82,"fyVariance":6.0,"varianceNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"","themes":["Delivery & schedule","Commercial & supply chain","Cost & funding","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating decreased from Amber/Red to Amber. This is primarily due to the following factors: The Armed Forces Recruiting Programme's previous Infrastructure and Projects Authority Gateway Assurance Review took place in June 2020 and resulting in an…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21"},{"id":"MOD_0119_1920-Q2","year":2022,"name":"Armed Forces Recruiting Programme","department":"MOD","category":"Military Capability","description":"The Armed Forces Recruiting Programme is the Tri-Service programme responsible for delivering a single, common Tri-Service Recruiting Operating Model for the Armed Forces.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber. This is primarily due to the following factors: While delivery confidence is stable at Amber, active risk management of programme resourcing in highly skilled areas that are in sector wide shortages remains.","startDate":"2018-03-15","endDate":"2024-09-30","scheduleNarrative":"Compared to 2021-Q4, the project end-date remained scheduled to finish on 30 September 2024.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"","themes":["Commercial & supply chain","Delivery & schedule","Cost & funding","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber. This is primarily due to the following factors: While delivery confidence is stable at Amber, active risk management of programme resourcing in highly skilled areas that are in sector wide shortages remains. Compared to…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"MOD_0119_1920-Q2","year":2023,"name":"Armed Forces Recruiting Programme","department":"MOD","category":"Military Capability","description":"The Armed Forces Recruiting Programme is the Tri-Service programme responsible for delivering a single; common Tri-Service Recruiting Operating Model for the Armed Forces. The Programme seeks to bring the three single Service recruiting activities together under one future recruiting service with a commercial partner and a single digital platform.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. While the Delivery Confidence remains stable at Amber there is significant risk to this approach to recruitment into the Armed Forces, particularly during the transition phase.","startDate":"2018-03-15","endDate":"2024-09-30","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2024-09-30. This is primarily due to the following factors. Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This programme does not report cashable benefits. Its aim is to deliver the armed forces a single recruitment strategy and operating model.","themes":["Commercial & supply chain","Delivery & schedule","Cost & funding"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. While the Delivery Confidence remains stable at Amber there is significant risk to this approach to recruitment into the Armed Forces, particularly during the…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"MOD_0119_1920-Q2","year":2024,"name":"Armed Forces Recruiting Programme","department":"MOD","category":"Military Capability","description":"The Armed Forces Recruiting Programme is the Tri-Service programme responsible for delivering a single, common Tri-Service Recruiting Operating Model for the Armed Forces. The Programme seeks to bring the three single Service recruiting activities together under one future recruiting service with a commercial partner and a single digital platform.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure and Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The most recent IPA review (October 2023) resulted in an Amber rating. Progress against required actions related to governance and confirming delivery timescales was achieved in advance of this review and enabled a focus on business readiness to transition to the new service from Contract Award, April 2025. All recommended actions are now being undertaken by the programme team ahead of a provisional Gateway 3 Review in September 2024.","startDate":"2018-03-15","endDate":"2028-04-30","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained scheduled to finish on 2028-04-30. This is primarily due to the following factors. AFRP gained approval (June 2023) during the assessment phase through Review Note 2 to extend competitive dialogue, subsequent to this, the programme has established an updated plan that includes a phased contract transition from Contract Award (CA) in April 2025 through to October 2027. The programme is on track against this revised baseline, with key future activities being evaluation and moderation of final bids, leading into Full Business Case Approvals ahead of CA in April 2025.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":0.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 0m.","themes":["Commercial & supply chain","Governance & assurance","Approvals & decisions","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure and Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The most recent IPA review (October 2023) resulted in an Amber rating. Progress against required actions related to governance and confirming delivery timescales…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"MOD_0119_1920-Q2","year":2025,"name":"ARMED FORCES RECRUITING PROGRAMME","department":"MoD","category":"Military Capability","description":"The Armed Forces Recruiting Programme is the Tri-Service programme responsible for delivering a single, common Tri-Service Recruiting Operating Model for the Armed Forces. The Programme seeks to bring the three single Service recruiting activities together under one future recruiting service with a commercial partner and a single digital platform.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. The most recent Assurance Review (October 24) focused on confirming that the recommended investment decision in the Full Business Case is appropriate. This resulted in an Amber rating, consistent with the previous review (October 23).","startDate":"2018-03-15","endDate":"2028-04-30","scheduleNarrative":"Section 43 - Commercial interests","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 43 - Commercial interests, No","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Commercial & supply chain","Governance & assurance","Approvals & decisions","Cost & funding"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. The most recent Assurance Review (October 24) focused on confirming that the recommended investment decision in the Full Business Case is appropriate. This resulted in an Amber rating, consistent with…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"MOD_0119_1920-Q2","year":2026,"name":"ARMED FORCES RECRUITING PROGRAMME","department":"MOD","category":"Military Capability","description":"The Armed Forces Recruiting Programme is the Tri-Service programme responsible for delivering a single, common Tri-Service Recruiting Operating Model for the Armed Forces. The Programme seeks to bring the three single Service recruiting activities together under one future recruiting service with a commercial partner and a single digital platform.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors. 1.The level of risk being carried with respect to the novel collaborative delivery of technical solution and data migration. 2. Delivery of some aspects of the service not progressing as initially planned, requiring joint risk mitigation and re-planning to be pursued. 3. Continued challenges in aggregating information to allow for improved tracking of progress against the delivery of this complex programme.","startDate":"2018-03-15","endDate":"2028-04-30","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same at 30/04/2028. This is primarily due to the following factors. 1. Timely approval of the Full Business Case and contract let with Team Serco that includes a phased transition from the contract becoming effective in April 2025 and allowing to progress to Full Solution Implementation in October 2027.","fyBaseline":50.89,"fyForecast":42.62,"fyVariance":16.24,"varianceNarrative":"The in-year variance exceeds 5%. This is primarily due to the following factors. 1. A review of FY25/26 forecast activity identified an £8.5M underspend generated by the the contingency provision not being required.","wholeLifeCost":201.02,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 has marginally increased from £194.96M to £195.05M. This is primarily due to the following factors. 1. The WLC figures include the Feasibility, Assessment and Transition phases. The funding for the Assessment phase reflected an earlier approval of funding plus civilian workforce costs which are not included in the original Approved Budgetary Level. 2. The AFRP Full Business Case was approved 31 January 2025 providing endorsement of a revised baseline of £2,258M for a 2-year transition period, 7 year core delivery contract and 3 x potential option years. £135.1M of this approval relates to the programme transition years, which have been included in the reported figures.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. There are no monetised benefits.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors. 1.The level of risk being carried with respect to the novel collaborative delivery of technical solution and data migration. 2. Delivery of some aspects of the service not progressing…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"MOD_0119_1920-Q2","year":2025,"name":"ARMED FORCES RECRUITING PROGRAMME","department":"MoD","category":"Military Capability","description":"The Armed Forces Recruiting Programme is the Tri-Service programme responsible for delivering a single, common Tri-Service Recruiting Operating Model for the Armed Forces. The Programme seeks to bring the three single Service recruiting activities together under one future recruiting service with a commercial partner and a single digital platform.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. The most recent Assurance Review (October 24) focused on confirming that the recommended investment decision in the Full Business Case is appropriate. This resulted in an Amber rating, consistent with the previous review (October 23).","startDate":"2018-03-15","endDate":"2028-04-30","scheduleNarrative":"Section 43 - Commercial interests","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 43 - Commercial interests, No","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Commercial & supply chain","Governance & assurance","Approvals & decisions","Cost & funding"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. The most recent Assurance Review (October 24) focused on confirming that the recommended investment decision in the Full Business Case is appropriate. This resulted in an Amber rating, consistent with…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":0,"attentionScore":23,"attentionReasons":["Current published delivery confidence is Amber","In-year forecast variance is +16.2%"]},{"id":"HO_0183_2223-Q3","year":2026,"name":"ASYLUM TRANSFORMATION PROGRAMME","department":"HO","category":"Government Transformation and Service Delivery","description":"The Asylum Transformation Programme is transforming people capabilities, process and technology underpinning the end to end asylum system, to create a flexible, sustainable and efficient system which has a transparent and outcome focussed customer journey, enabling strong partner and public trust and an improved colleague experience.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared with Q4 2024/25, the NISTA Delivery Confidence Assessment (DCA) rating for Q4 2025/26 remains Amber. This reflects continued delivery progress alongside a number of ongoing risks and dependencies. The programme has maintained good momentum across multiple projects, with progress against its strategic objectives continuing. However, challenges remain in relation to resourcing and prioritisation within key enabling functions on which the programme is dependent. These dependencies continue to require active management and mitigation to support successful programme delivery.","startDate":"2022-09-01","endDate":null,"scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same: 31st March 2027. This reflects the successful delivery to date and the confidence in future plans.","fyBaseline":80.01,"fyForecast":67.13,"fyVariance":16.1,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors; technical delays meant that spend was incurred later than expected. This was partly due to technical complexity which is inherent in some of the pioneering AI and automation work that the programme is delivering.","wholeLifeCost":429.95,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 increased from £362m to £431.78m. This is primarily due to an increase in programme scope for 25/26.","benefits":13059.47,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 increased from £2,748m to £13,153.14m. This is primarily due to the increase in programme scope for 25/26 to include Appeals-related projects; which brought a significant benefit. The Asylum Transformation Programme (ATP) has already delivered significant improvements in the UK asylum system; totalling over £1bn in benefits up to the end of 25/26.","themes":["Cost & funding","Delivery & schedule","Technical & integration","Scope & requirements"],"evidenceExcerpt":"Compared with Q4 2024/25, the NISTA Delivery Confidence Assessment (DCA) rating for Q4 2025/26 remains Amber. This reflects continued delivery progress alongside a number of ongoing risks and dependencies. The programme has maintained good momentum across multiple projects, with progress against its strategic objectives continuing. However, challenges…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"HO_0183_2223-Q3","year":2024,"name":"Asylum & Protection Transformation Programme","department":"HO","category":"Government Transformation and Service Delivery","description":"The Asylum Transformation Programme is transforming people capabilities, process and technology underpinning asylum casework and asylum support and accommodation. The four strategic objectives of the programme are:_x000D_ 1. A flexible, sustainable and efficient system,_x000D_ 2. A transparent and outcome focused customer journey,_x000D_ 3. Strong partner and public trust,_x000D_ 4. Improved colleague experience._x000D_ _x000D_ The role of the Asylum Transformation Programme is to enhance the processing capabilities, societal value and cost-effectiveness of the Asylum System, enabling it ever-increasingly, to better meet the interests and concerns of the many stakeholders in UK asylum, now and in the future.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. The Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is due to a positive IPA Gate 0 review identifying the programme as Amber, in which it has been noted as a well run and committed programme, which has successfully delivered to date, but facing wider major strategic and contextual issues, affecting delivery confidence._x000D_ _x000D_ These include operational capacity to implement change, constrained capacity in technical enablers which is limiting the pace Programmes can develop technical solutions and deliver continuous improvement. As well as the capacity constraints anticipated to deliver alongside the Illegal Migration Act.","startDate":"2022-09-01","endDate":"2025-12-31","scheduleNarrative":"The project's end-date at 23/24-Q4 is 2025-12-31. This is primarily due to the following factors. The project's end-date at 23/24-Q4 is schedule to finish on 31 December 2025. This is primarily due to the following factors: of being in-line with our current delivery plans.","fyBaseline":172.4,"fyForecast":162.9,"fyVariance":-6.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The programme's budget variance exceeds 5%.","wholeLifeCost":441.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 23/24-Q4 is 441m. This is primarily due to the following factors. The whole life cost of the programme has been established following Green book principles. The forecasted whole life costs reflects the full programme scope including resource costs to deliver the projects and activities, capital costs, ongoing and run costs of future platforms, and significantly costs for the Dispersal Grants provided to Local Authorities who accommodate Asylum Seekers. The whole-life cost reported here, reflects the 23-24 Programme Business Case, and the programme is currently in the process of refreshing the Business Case for FY 24-25, where the whole life cost of the programme is anticipated to change. These changes will be reflected in next quarter reporting.","benefits":18143.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 18143m. The programme's forecasted benefits for the 10-year appraisal period are significant. They are largely driven by forecasted financial savings due to reduced hotel costs as a result of increased dispersal bed use, as well as financial efficiency savings due to faster processing of claims, and therefore, reduced accommodation and support spend. The benefits reported here, reflects the 23-24 Programme Business Case, and the programme is currently in the process of refreshing the Business Case for FY 24-25, where the benefits of the programme are anticipated to change. These changes will be reflected in next quarter reporting.","themes":["Cost & funding","Delivery & schedule","Workforce & capability","Technical & integration"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. The Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is due to a positive IPA Gate 0 review identifying the programme as Amber, in which it has been noted as a…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"HO_0183_2223-Q3","year":2025,"name":"ASYLUM TRANSFORMATION PROGRAMME","department":"HO","category":"Government Transformation and Service Delivery","description":"The Asylum Transformation Programme is transforming people capabilities, process and technology underpinning asylum casework and asylum support and accommodation, to create a flexible, sustainable and efficient system which has a transparent and outcome focussed customer journey, enabling strong partner and public trust and an improved colleague experience.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ 1) Ongoing successful delivery against the strategic objectives including the successful design and pilot of AI tools to support caseworking, the delivery and implementation of an asylum support discontinuation and move on function, and the increase in occupancy of Dispersed Accommodation. 2) The acknowledgement that the programme continued to face challenges outside of it's control, including resource shortages of enabling functions due to competing priorities within the Home Office.","startDate":"2022-09-01","endDate":"2027-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/12/2026 to 31/03/2027. This is primarily due to the following factors‚ 1) Delivery of existing scope at a slower pace than anticipated due to resource restrictions of enabling resources. 2) A significant extension of the programme scope to cover additional projects as a result of the closure of another programme, as well as an increase scope to align with the new Government priorities.","fyBaseline":88.5,"fyForecast":40.1,"fyVariance":54.69,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ Delivery at a slower pace than anticipated due to resource restrictions.","wholeLifeCost":362.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 441 to 362. This is primarily due to the following factors‚ A change in programme scope from the FY23/24 to the FY 24/25, to see the removal of obtaining Dispersed Accommodation, and moved into Business as Usual.","benefits":2748.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) decreased from 18143 to 2748. This is primarily due to the following factors‚ A change in programme scope from the FY23/24 to the FY 24/25, to see the removal of obtaining Dispersed Accommodation, and moved into Business as Usual.","themes":["Delivery & schedule","Cost & funding","Scope & requirements","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ 1) Ongoing successful delivery against the strategic objectives including the successful design and pilot of AI tools to support caseworking, the delivery and…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"HO_0183_2223-Q3","year":2026,"name":"ASYLUM TRANSFORMATION PROGRAMME","department":"HO","category":"Government Transformation and Service Delivery","description":"The Asylum Transformation Programme is transforming people capabilities, process and technology underpinning the end to end asylum system, to create a flexible, sustainable and efficient system which has a transparent and outcome focussed customer journey, enabling strong partner and public trust and an improved colleague experience.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared with Q4 2024/25, the NISTA Delivery Confidence Assessment (DCA) rating for Q4 2025/26 remains Amber. This reflects continued delivery progress alongside a number of ongoing risks and dependencies. The programme has maintained good momentum across multiple projects, with progress against its strategic objectives continuing. However, challenges remain in relation to resourcing and prioritisation within key enabling functions on which the programme is dependent. These dependencies continue to require active management and mitigation to support successful programme delivery.","startDate":"2022-09-01","endDate":null,"scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same: 31st March 2027. This reflects the successful delivery to date and the confidence in future plans.","fyBaseline":80.01,"fyForecast":67.13,"fyVariance":16.1,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors; technical delays meant that spend was incurred later than expected. This was partly due to technical complexity which is inherent in some of the pioneering AI and automation work that the programme is delivering.","wholeLifeCost":429.95,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 increased from £362m to £431.78m. This is primarily due to an increase in programme scope for 25/26.","benefits":13059.47,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 increased from £2,748m to £13,153.14m. This is primarily due to the increase in programme scope for 25/26 to include Appeals-related projects; which brought a significant benefit. The Asylum Transformation Programme (ATP) has already delivered significant improvements in the UK asylum system; totalling over £1bn in benefits up to the end of 25/26.","themes":["Cost & funding","Delivery & schedule","Technical & integration","Scope & requirements"],"evidenceExcerpt":"Compared with Q4 2024/25, the NISTA Delivery Confidence Assessment (DCA) rating for Q4 2025/26 remains Amber. This reflects continued delivery progress alongside a number of ongoing risks and dependencies. The programme has maintained good momentum across multiple projects, with progress against its strategic objectives continuing. However, challenges…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"HO_0183_2223-Q3","year":2025,"name":"ASYLUM TRANSFORMATION PROGRAMME","department":"HO","category":"Government Transformation and Service Delivery","description":"The Asylum Transformation Programme is transforming people capabilities, process and technology underpinning asylum casework and asylum support and accommodation, to create a flexible, sustainable and efficient system which has a transparent and outcome focussed customer journey, enabling strong partner and public trust and an improved colleague experience.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ 1) Ongoing successful delivery against the strategic objectives including the successful design and pilot of AI tools to support caseworking, the delivery and implementation of an asylum support discontinuation and move on function, and the increase in occupancy of Dispersed Accommodation. 2) The acknowledgement that the programme continued to face challenges outside of it's control, including resource shortages of enabling functions due to competing priorities within the Home Office.","startDate":"2022-09-01","endDate":"2027-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/12/2026 to 31/03/2027. This is primarily due to the following factors‚ 1) Delivery of existing scope at a slower pace than anticipated due to resource restrictions of enabling resources. 2) A significant extension of the programme scope to cover additional projects as a result of the closure of another programme, as well as an increase scope to align with the new Government priorities.","fyBaseline":88.5,"fyForecast":40.1,"fyVariance":54.69,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ Delivery at a slower pace than anticipated due to resource restrictions.","wholeLifeCost":362.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 441 to 362. This is primarily due to the following factors‚ A change in programme scope from the FY23/24 to the FY 24/25, to see the removal of obtaining Dispersed Accommodation, and moved into Business as Usual.","benefits":2748.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) decreased from 18143 to 2748. This is primarily due to the following factors‚ A change in programme scope from the FY23/24 to the FY 24/25, to see the removal of obtaining Dispersed Accommodation, and moved into Business as Usual.","themes":["Delivery & schedule","Cost & funding","Scope & requirements","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ 1) Ongoing successful delivery against the strategic objectives including the successful design and pilot of AI tools to support caseworking, the delivery and…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":null,"attentionScore":23,"attentionReasons":["Current published delivery confidence is Amber","In-year forecast variance is +16.1%"]},{"id":"DBT_0293_2324-Q3","year":2026,"name":"POST OFFICE - TRANSFORMATION","department":"DBT","category":"Information and Communications Technology (ICT)","description":"Post Office Transformation Programme, a five-year programme to secure the network’s long-term future by modernising technology, strengthening the commercial offer, reshaping the operating model, and improving Postmaster and stakeholder relationships while maintaining financial stability. POL’s five-year Transformation Plan is split into: STP 4 pillars – Commercial Offer, Network, Operating Model, Stakeholder Relations. FTP 5th pillar - Technology & Data.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 has improved to Amber from Red representing the material progress made in establishing the programme and its underlying control infrastructure.","startDate":"2025-04-01","endDate":null,"scheduleNarrative":"We remain on track with the 5 year overall programme and core outcomes expected from it.","fyBaseline":267.53,"fyForecast":226.56,"fyVariance":15.31,"varianceNarrative":"Budget variance includes proactive review and return of under utilised funding in line with monthly dialogue with DBT.","wholeLifeCost":1553.73,"costNarrative":"WLC in line with business case.","benefits":null,"benefitsNarrative":"Benefits and outcomes remain in line with overall business case.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 has improved to Amber from Red representing the material progress made in establishing the programme and its underlying control infrastructure. We remain on track with the 5 year overall programme and core outcomes expected from it.","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"DBT_0293_2324-Q3","year":2025,"name":"POST OFFICE - NEW IT SYSTEM","department":"DBT","category":"ICT","description":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","startDate":null,"endDate":null,"scheduleNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","wholeLifeCost":null,"costNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","benefits":null,"benefitsNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"DBT_0293_2324-Q3","year":2026,"name":"POST OFFICE - TRANSFORMATION","department":"DBT","category":"Information and Communications Technology (ICT)","description":"Post Office Transformation Programme, a five-year programme to secure the network’s long-term future by modernising technology, strengthening the commercial offer, reshaping the operating model, and improving Postmaster and stakeholder relationships while maintaining financial stability. POL’s five-year Transformation Plan is split into: STP 4 pillars – Commercial Offer, Network, Operating Model, Stakeholder Relations. FTP 5th pillar - Technology & Data.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 has improved to Amber from Red representing the material progress made in establishing the programme and its underlying control infrastructure.","startDate":"2025-04-01","endDate":null,"scheduleNarrative":"We remain on track with the 5 year overall programme and core outcomes expected from it.","fyBaseline":267.53,"fyForecast":226.56,"fyVariance":15.31,"varianceNarrative":"Budget variance includes proactive review and return of under utilised funding in line with monthly dialogue with DBT.","wholeLifeCost":1553.73,"costNarrative":"WLC in line with business case.","benefits":null,"benefitsNarrative":"Benefits and outcomes remain in line with overall business case.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 has improved to Amber from Red representing the material progress made in establishing the programme and its underlying control infrastructure. We remain on track with the 5 year overall programme and core outcomes expected from it.","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"DBT_0293_2324-Q3","year":2025,"name":"POST OFFICE - NEW IT SYSTEM","department":"DBT","category":"ICT","description":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","startDate":null,"endDate":null,"scheduleNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","wholeLifeCost":null,"costNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","benefits":null,"benefitsNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":null,"transition":"Not comparable","endDateDeltaDays":null,"attentionScore":23,"attentionReasons":["Current published delivery confidence is Amber","In-year forecast variance is +15.3%"]},{"id":"BEIS_0009_2021-Q3","year":2026,"name":"SIXEP CONTINUITY PLANT","department":"DESNZ","category":"Infrastructure and Construction","description":"The SCP project will design, construct, inactively commission and handover a new radioactive effluent treatment facility, which is a mission critical requirement for Sellafield. Without this facility critical work at Sellafield would cease, most importantly the retrieval of legacy high hazard materials. Through spent nuclear fuel and waste management operations Sellafield site produces liquid effluent which requires treatment to remove radioactivity before discharge into the sea. This capability is currently delivered by the Site Ion Exchange Effluent Plant (SIXEP). The continued availability of effluent treatment via SIXEP is a regulatory compliance requirement and is essential for delivery of the site missions including high hazard and risk reduction activities (HHRR), underpinning the Government’s UK Discharge Strategy and OSPAR commitments. Continued effluent treatment through SIXEP (or SCP when available) is fundamental to the NDA Mission to “deliver safe, sustainable and publicly acceptable solutions to the challenge of nuclear clean-up and waste management.”","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at GREEN. This is primarily due to the following factors: The Project is currently in the execution stage, being delivered by the Programme and Project Partnership (PPP,) and is showing no significant threat to the overall P80 schedule which was also supported by the annual NISTA Gate 0 review undertaken in July 2025 which gave a GREEN Delivery Confidence Assessment, noting that delivery of the project “within the P80 schedule was assessed as highly likely.\"","startDate":"2013-05-25","endDate":"2031-10-21","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 has increased from 23-Jan-2031 to 21-Oct-2031. This is primarily due to the following factor: Change in legislation relating to Passive Fire Protection Standards; the new requirements are more onerous than the original design specification. Due to the required design updates a number of critical path scope packages have been impacted and subsequently the project completion date has been delayed, which remains within the P80 schedule.","fyBaseline":114.77,"fyForecast":142.13,"fyVariance":23.84,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The project has experienced cost increases across several packages, beyond original assumptions. This has been further compounded by the impact, and constraints, of industrial action. A number of contractual adjustment events are in flight for which the project has captured/incurred costs. Until these are agreed, and associated baseline is implemented, a variance will remain between departmental baseline and Forecast/cost.","wholeLifeCost":1097.5,"costNarrative":"The increase to the project's departmentally agreed Whole Life Cost at 25/26-Q4 is primarily due to: Annual Indexation, in line with the agreed indices, and the impact of the agreed contractual adjustment event for Passive Fire Protection legislative change.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained 0. This is primarily due to the following factors: There are no monetised benefits within the SCP project however, it will provide key capabilities which in enables the following benefits: • Allows the Site Licence owner to meet its requirements in the regulatory permit. • Provides effluent abatement to 2060 in support of site missions. • Provides an opportunity to deploy an Alternative Ion Exchange (IX) media that improves abatement performance, following the consideration of best available technique (BAT). • Maintaining unconstrained Site Ion Exchange Effluent Plant (SIXEP) waste material storage capacity.","themes":["Delivery & schedule","Cost & funding","Scope & requirements","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at GREEN. This is primarily due to the following factors: The Project is currently in the execution stage, being delivered by the Programme and Project Partnership (PPP,) and is showing no significant threat to the overall P80 schedule which…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"BEIS_0009_2021-Q3","year":2021,"name":"SIXEP Continuity Plant","department":"BEIS","category":"Infrastructure and Construction","description":"SIXEP Continuity Plant will replace the existing effluent treatment plant at Sellafield as it approaches end of life and will provide interim waste storage capability. It is a key enabler for the safe and reliable retrieval and treatment of legacy waste at Sellafield, in support of government and Nuclear Decommissioning Authority strategic objectives.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber/red.This is primarily due to the following factors: This is a complex nuclear project on an operational nuclear site. The project is undergoing a structured assurance to support the Full Business Case and will come forward for sanction in Q3 2021. It is important that the project identifies the level of technical maturity and supply chain capability and capacity it will carry beyond this gate. Additionally, robust asset management of existing facilities associated with the site effluent infrastructure will need to be demonstrated for the project and wider programme benefits to be realised. The newly established Programme and Project Partnership is being used to deliver this project and its success is critical. Finally, the project has been affected by Covid-19, with significant efforts ongoing to minimise impact on overall cost and schedule. It is also worth noting that this project replaces the current effluent treatment facility and is mission critical to the future safe operation of the site.","startDate":"2013-05-25","endDate":"2027-12-20","scheduleNarrative":"The project end-date is 20 December 2027. This is primarily due to the following factors: This is a complex nuclear project and its delivery has been affected by Covid-19. The forecast Project lifecycle end date is within the date range sited in the Outline Business Case but has been impcated by Covid-19 and specifically relates to delays in development of a specialist valve prototype. Development of the valve could take longer than anticipated leading to delays in delivery of the SIXEP Continuity Plant capability. Due to the location of Sellafield getting suppliers from other parts of the country, the ability to get people onto site safely from a worker density viewpoint and the adjacent on-going nuclear operational activities make achieving normal productivity levels impossible. The Sellafield Executive have maximised the position given the circumstances and constraints.","fyBaseline":38.49,"fyForecast":45.54,"fyVariance":18.0,"varianceNarrative":"The budget variance exceeds 5%. The forecast spend for 2020/21 is �45M, 18% higher than the profile in the Outline Business Case. This is due to the acceleration of construction work in 2019/20 and 2020/21 against the baseline. While the project is forecasting to be ahead of the baseline at year end this does not reflect the true impact of Covid-19, which has slowed delivery in year and led to some cost inefficiencies.","wholeLifeCost":589.91,"costNarrative":"The projects Baseline Whole Life Cost is �589.91m. This is primarily due to the following factors: The bulk of the information in this submission is based around the Outline Business Case approved in 2020. The project is progressing towards Full Business Case approval in Q3 2021 after which the information will be updated. The approved cost range is �574m to �1,050m (not taking account of Covid-19 impact). The project forecast is at the upper end of this range. The Reference Class Forecasting model is likely to exceed the Outline Business Case upper range when Covid-19 impact is included. A full impact assessment of Covid-19 will be included in the Full Business Case submission.","benefits":null,"benefitsNarrative":"","themes":["Approvals & decisions","Cost & funding","Delivery & schedule","Workforce & capability"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber/red.This is primarily due to the following factors: This is a complex nuclear project on an operational nuclear site. The project is undergoing a structured assurance to support the Full Business Case and will come forward for sanction in Q3 2021. It is important that the…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21"},{"id":"BEIS_0009_2021-Q3","year":2022,"name":"SIXEP Continuity Plant","department":"BEIS","category":"Infrastructure and Construction","description":"SIXEP Continuity Plant will replace the existing effluent treatment plant at Sellafield as it approaches end of life and will provide interim waste storage capability. It is a key enabler for the safe and reliable retrieval and treatment of legacy waste at Sellafield, in support of government and Nuclear Decommissioning Authority strategic objectives.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 decreased from Amber/red to Amber This is a complex nuclear project on an operational nuclear site. The Full Business Case was approved by government in December 2021 and is in execution with manufacturing and construction activities ongoing. The first major project milestone is on track for July 2022 and the project end date remains stable. More broadly, robust asset management of existing facilities associated with the site effluent infrastructure will need to be ensured for the project and wider programme benefits to be realised. The newly established Programme and Project Partnership is being used to deliver this project and its success is critical. It is also worth noting that this project replaces the current effluent treatment facility and is mission critical to the future safe operation of the site.","startDate":"2013-05-25","endDate":"2031-01-23","scheduleNarrative":"Compared to 2021-Q4, your project end-date increased from 20 DEC 2027 to 23 JAN 2031 . This is primarily due to the following factors: The Full Business Case (FBC) has been approved by HMT, and the Programme and Project Partners (PPP) Major Project Baseline has been set with the project completion date May 2030 with a ICP50 date of January 2031, inclusive of COVID impact to June 2021. The Project remains on schedule and is forecast to deliver within the FBC IC P50 dates.","fyBaseline":93.93,"fyForecast":84.44,"fyVariance":-11.0,"varianceNarrative":"The spend for 2021/22 of £84.44m is 11% lower than the planned scope of £93.93m. The in-year delta comprises (i) deferral of some project specific procurement packages to align with long-term strategic procurements; and (ii) cost savings in the areas of site logistics and resourcing.","wholeLifeCost":960.0,"costNarrative":"Compared to2021-Q4, the projects Baseline Whole Life Cost increased from 589.91 (£m) to 959.62 (£m). This is primarily due to the following factors: The Full Business Case (FBC) has been approved by HMT, and the Programme and Project Partners (PPP) Major Project Baseline have been set with the project completion date May 2030 with a P50 date of January 2031, inclusive of COVID impact to June 2021. The lifecycle cost has increased to £1.007bn (@P50 incl. Covid-19 up to June 2021), £1.182bn (@P80 incl. Covid-19 beyond June 2021) and £1.25bn with Reference Class Forecasting/ Optimum Bias and COVID impacts up to June 20/21. All numbers are inflated as per FBC. The current baseline figures are reported at FBC, inclusive of Aligned Incentive Fund (AIF) and Intelligent Client (IC) P50.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 decreased from Amber/red to Amber This is a complex nuclear project on an operational nuclear site. The Full Business Case was approved by government in December 2021 and is in execution with manufacturing and construction activities…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"BEIS_0009_2021-Q3","year":2023,"name":"SIXEP Continuity Plant","department":"DESNZ","category":"Infrastructure and Construction","description":"SIXEP Continuity Plant (SCP) is required to deliver a continued site effluent capability in support of high hazard reduction projects and the overall NDA mission. It is a key enabler for the safe and reliable retrieval and treatment of legacy waste at Sellafield, in support of government and Nuclear Decommissioning Authority strategic objectives.","ipaDca":"Green","sroDca":null,"deliveryConfidence":"Green","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 increased from Amber to Green. This is primarily due to the following factors. This is a complex nuclear project on an operational nuclear site. The Project is in the execution stage with manufacturing and construction activities ongoing. The SCP project is being delivered by the Programme and Project Partnership (PPP). The IPA afforded this project a RAG rating of GREEN.","startDate":"2013-05-25","endDate":"2031-01-23","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2031-01-23. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2031-01-23. This is primarily due to the following factors. The Project remains on schedule and there is no change to the date of 23 January 2031.","fyBaseline":198.82,"fyForecast":114.02,"fyVariance":-43.0,"varianceNarrative":"The in year spend is less than the budget for 2022/23 due to realignment to PPP Multi Project Procurements and the Category Management approach. This shows that the project is not spending money ahead of demand, does not affect the overall spend position for the project and better aligns key procurements to the current construction delivery strategy. The decision maintains the equipment required on site dates and minimises interim storage costs for plant and equipment.","wholeLifeCost":1034.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 increased from 960m. to 1034m. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 increased from 960m. to 1034m. This is primarily due to the following factors. Compared to 21/22-Q4, the SCP budgeted cost (baseline) has increased by 74.25m, this is due to escalation in line with the agreed indices.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. The project did not provide departmental-agree monetised benefits at 22/23-Q4. There are no monetised benefits within the SCP project however, it will provide key capabilities which in enables the following benefits: Allows the Site Licence owner to meet its requirements in the regulatory permit. Provides effluent abatement to 2060 in support of site missions. Provides an opportunity to deploy an Alternative Ion Exchange (IX) media that improves abatement performance, following the consideration of best available technique (BAT). Maintaining unconstrained Site Ion Exchange Effluent Plant (SIXEP) waste material storage capacity.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 increased from Amber to Green. This is primarily due to the following factors. This is a complex nuclear project on an operational nuclear site. The Project is in the execution stage with manufacturing and construction activities…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"BEIS_0009_2021-Q3","year":2024,"name":"SIXEP Continuity Plant","department":"DESNZ","category":"Infrastructure and Construction","description":"SIXEP Continuity Plant (SCP) is required to deliver a continued site effluent capability in support of high hazard reduction projects and the overall NDA mission. It is a key enabler for the safe and reliable retrieval and treatment of legacy waste at Sellafield, in support of government and Nuclear Decommissioning Authority strategic objectives.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 22/23-Q4, the Delivery Confidence Assessment rating at 23/24-Q4 remained at Green(SRO rating). This is primarily due to the following factors. This is a complex nuclear project on an operational nuclear site. The Project is in the execution stage with manufacturing and construction activities ongoing. The SCP project is being delivered by the Programme and Project Partnership (PPP). The IPA afforded this project a RAG rating of GREEN.","startDate":"2013-05-25","endDate":"2031-01-23","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2031-01-23. This is primarily due to the following factors. The Project remains on schedule and there is no change to the date of 23 January 2031.","fyBaseline":142.16,"fyForecast":163.45,"fyVariance":15.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The in year spend is greater than the budget (baseline) for 2023/24 due to realignment to PPP Multi Project Procurements and the Category Management approach. The project is showing recovery against the cumulative baseline position. This does not affect the overall spend position for the project and better aligns key procurements to the current construction delivery strategy. The decision maintains the equipment 'required on site dates'.","wholeLifeCost":1076.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 increased from 1034m. to 1076m. This is primarily due to the following factors. The SCP budgeted cost (baseline) has increased by 42m, this is due to escalation in line with the agreed indices.","benefits":0.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 0m. There are no monetised benefits within the SCP project however, it will provide key capabilities which in enables the following benefits: . Allows the Site Licence owner to meet its requirements in the regulatory permit. . Provides effluent abatement to 2060 in support of site missions. . Provides an opportunity to deploy an Alternative Ion Exchange (IX) media that improves abatement performance, following the consideration of best available technique (BAT). . Maintaining unconstrained Site Ion Exchange Effluent Plant (SIXEP) waste material storage capacity.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Delivery Confidence Assessment rating at 23/24-Q4 remained at Green(SRO rating). This is primarily due to the following factors. This is a complex nuclear project on an operational nuclear site. The Project is in the execution stage with manufacturing and construction activities ongoing. The SCP project is being…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"BEIS_0009_2021-Q3","year":2025,"name":"SIXEP CONTINUITY PLANT","department":"DESNZ","category":"Infrastructure and Construction","description":"SIXEP Continuity Plant (SCP) is required to deliver a continued site effluent capability in support of high hazard reduction projects and the overall NDA mission.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at GREEN. This is primarily due to the following factors‚ This is a complex nuclear project on an operational nuclear site. The Project is in the execution stage and continues to transition from bulk civil construction to mechanical and electrical fit out and is currently showing no significant threat to the overall P80 schedule. The SCP project is being delivered by the Programme and Project Partnership (PPP). The IPA afforded this project a RAG rating of GREEN.","startDate":"2013-05-25","endDate":"2031-01-23","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 23/01/2031. This is primarily due to the following factors‚ The Project remains on schedule and there is no change to the date of 23/01/2031.","fyBaseline":126.75,"fyForecast":161.83,"fyVariance":27.68,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The in year spend is greater than the budget (baseline) for 2023/24 due to realignment to PPP Multi Project Procurements and the Category Management approach. The project is showing recovery against the cumulative baseline position. This does not affect the overall spend position for the project and better aligns key procurements to the current construction delivery strategy.","wholeLifeCost":1092.97,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 1076 to 1092. This is primarily due to the following factors‚ Compared to 23/24-Q4, the SCP budgeted cost (baseline) has increased by £16m, this is due to escalation in line with the agreed indices.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ There are no monetised benefits within the SCP project however, it will provide key capabilities which in enables the following benefits: • Allows the Site Licence owner to meet its requirements in the regulatory permit. • Provides effluent abatement to 2060 in support of site missions. • Provides an opportunity to deploy an Alternative Ion Exchange (IX) media that improves abatement performance, following the consideration of best available technique (BAT). • Maintaining unconstrained Site Ion Exchange Effluent Plant (SIXEP) waste material storage capacity.","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at GREEN. This is primarily due to the following factors‚ This is a complex nuclear project on an operational nuclear site. The Project is in the execution stage and continues to transition from bulk civil construction to…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"BEIS_0009_2021-Q3","year":2026,"name":"SIXEP CONTINUITY PLANT","department":"DESNZ","category":"Infrastructure and Construction","description":"The SCP project will design, construct, inactively commission and handover a new radioactive effluent treatment facility, which is a mission critical requirement for Sellafield. Without this facility critical work at Sellafield would cease, most importantly the retrieval of legacy high hazard materials. Through spent nuclear fuel and waste management operations Sellafield site produces liquid effluent which requires treatment to remove radioactivity before discharge into the sea. This capability is currently delivered by the Site Ion Exchange Effluent Plant (SIXEP). The continued availability of effluent treatment via SIXEP is a regulatory compliance requirement and is essential for delivery of the site missions including high hazard and risk reduction activities (HHRR), underpinning the Government’s UK Discharge Strategy and OSPAR commitments. Continued effluent treatment through SIXEP (or SCP when available) is fundamental to the NDA Mission to “deliver safe, sustainable and publicly acceptable solutions to the challenge of nuclear clean-up and waste management.”","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at GREEN. This is primarily due to the following factors: The Project is currently in the execution stage, being delivered by the Programme and Project Partnership (PPP,) and is showing no significant threat to the overall P80 schedule which was also supported by the annual NISTA Gate 0 review undertaken in July 2025 which gave a GREEN Delivery Confidence Assessment, noting that delivery of the project “within the P80 schedule was assessed as highly likely.\"","startDate":"2013-05-25","endDate":"2031-10-21","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 has increased from 23-Jan-2031 to 21-Oct-2031. This is primarily due to the following factor: Change in legislation relating to Passive Fire Protection Standards; the new requirements are more onerous than the original design specification. Due to the required design updates a number of critical path scope packages have been impacted and subsequently the project completion date has been delayed, which remains within the P80 schedule.","fyBaseline":114.77,"fyForecast":142.13,"fyVariance":23.84,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The project has experienced cost increases across several packages, beyond original assumptions. This has been further compounded by the impact, and constraints, of industrial action. A number of contractual adjustment events are in flight for which the project has captured/incurred costs. Until these are agreed, and associated baseline is implemented, a variance will remain between departmental baseline and Forecast/cost.","wholeLifeCost":1097.5,"costNarrative":"The increase to the project's departmentally agreed Whole Life Cost at 25/26-Q4 is primarily due to: Annual Indexation, in line with the agreed indices, and the impact of the agreed contractual adjustment event for Passive Fire Protection legislative change.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained 0. This is primarily due to the following factors: There are no monetised benefits within the SCP project however, it will provide key capabilities which in enables the following benefits: • Allows the Site Licence owner to meet its requirements in the regulatory permit. • Provides effluent abatement to 2060 in support of site missions. • Provides an opportunity to deploy an Alternative Ion Exchange (IX) media that improves abatement performance, following the consideration of best available technique (BAT). • Maintaining unconstrained Site Ion Exchange Effluent Plant (SIXEP) waste material storage capacity.","themes":["Delivery & schedule","Cost & funding","Scope & requirements","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at GREEN. This is primarily due to the following factors: The Project is currently in the execution stage, being delivered by the Programme and Project Partnership (PPP,) and is showing no significant threat to the overall P80 schedule which…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"BEIS_0009_2021-Q3","year":2025,"name":"SIXEP CONTINUITY PLANT","department":"DESNZ","category":"Infrastructure and Construction","description":"SIXEP Continuity Plant (SCP) is required to deliver a continued site effluent capability in support of high hazard reduction projects and the overall NDA mission.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at GREEN. This is primarily due to the following factors‚ This is a complex nuclear project on an operational nuclear site. The Project is in the execution stage and continues to transition from bulk civil construction to mechanical and electrical fit out and is currently showing no significant threat to the overall P80 schedule. The SCP project is being delivered by the Programme and Project Partnership (PPP). The IPA afforded this project a RAG rating of GREEN.","startDate":"2013-05-25","endDate":"2031-01-23","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 23/01/2031. This is primarily due to the following factors‚ The Project remains on schedule and there is no change to the date of 23/01/2031.","fyBaseline":126.75,"fyForecast":161.83,"fyVariance":27.68,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The in year spend is greater than the budget (baseline) for 2023/24 due to realignment to PPP Multi Project Procurements and the Category Management approach. The project is showing recovery against the cumulative baseline position. This does not affect the overall spend position for the project and better aligns key procurements to the current construction delivery strategy.","wholeLifeCost":1092.97,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 1076 to 1092. This is primarily due to the following factors‚ Compared to 23/24-Q4, the SCP budgeted cost (baseline) has increased by £16m, this is due to escalation in line with the agreed indices.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ There are no monetised benefits within the SCP project however, it will provide key capabilities which in enables the following benefits: • Allows the Site Licence owner to meet its requirements in the regulatory permit. • Provides effluent abatement to 2060 in support of site missions. • Provides an opportunity to deploy an Alternative Ion Exchange (IX) media that improves abatement performance, following the consideration of best available technique (BAT). • Maintaining unconstrained Site Ion Exchange Effluent Plant (SIXEP) waste material storage capacity.","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at GREEN. This is primarily due to the following factors‚ This is a complex nuclear project on an operational nuclear site. The Project is in the execution stage and continues to transition from bulk civil construction to…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":271,"attentionScore":23,"attentionReasons":["Published end date moved 271 days later","In-year forecast variance is +23.8%"]},{"id":"HMRC_0544_2526-Q2","year":2026,"name":"Contact Centre as a Service (CCaaS)","department":"HMRC","category":"Government Transformation and Service Delivery","description":"Contact Centre as a Service (CCaaS) is a programme to modernise HMRC’s contact centre technology. It will replace ageing systems with a secure, cloud‑based platform that makes it easier for customers to contact HMRC and for advisors to provide a better, more efficient service. CCaaS will improve call handling, digital contact options and service resilience, helping HMRC respond more effectively to customer demand while supporting future service improvements.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Contact Centre as a Service programme is rated Amber as it moves into mobilisation and discovery following supplier approval. The rating reflects known delivery risks, including maintaining service continuity during transition from legacy systems; ensuring sufficient delivery and integration capacity; achieving business readiness and adoption across operational teams; and dependency on timely deployment to realise benefits. These risks are understood and are being actively managed through phased delivery, strengthened business readiness activity, clear accountabilities, and ongoing governance and assurance. Delivery is being actively managed to maintain control of cost, scope and delivery assumptions, while strengthening capability and business readiness to support successful implementation and adoption. Ongoing assurance and governance arrangements are in place, with actions tracked to completion, providing confidence that the programme remains deliverable and that benefits will be realised as planned.","startDate":"2025-04-01","endDate":"2027-10-29","scheduleNarrative":"The schedule reflects the completion of procurement activity in line with plan and a continued focus on ensuring a safe and controlled transition from existing contact centre systems. The schedule continues to balance pace with service continuity, allowing sufficient time for implementation, testing and business readiness activities to minimise the risk of disruption to live services.","fyBaseline":6.33,"fyForecast":5.64,"fyVariance":10.87,"varianceNarrative":"The budget variance exceeds 5% and reflects the transition from early, high-level estimates to a more mature and assumption-led forecast. As delivery plans and commercial positions have developed, previously indicative budget assumptions have been revisited, with greater clarity on scope, profiling and cost drivers. As a result, the current forecast provides a more realistic and evidence-based view of expected spend, with variance mainly driven by improved definition and the reclassification of uncertain elements rather than a change in overall delivery ambition.","wholeLifeCost":571.86,"costNarrative":"The programme continues to deliver within its approved funding envelope. This reflects cost estimates that are consistent with the approved business case and the programme’s current stage, with costs being closely managed as the programme moves from procurement into delivery.","benefits":237.99,"benefitsNarrative":"The programme has defined its expected benefits, and is expected to improve service resilience, customer experience and operational efficiency and is taking action to ensure it is affordable, delivers value for money and is achievable. The programme is establishing clear, measurable benefits with accountable owners, alongside baselining current performance to enable robust tracking of benefits realisation. Full monetisation of benefits will be completed following supplier selection and finalisation of the detailed design and operating model, when implementation choices and delivery profiles are confirmed.","themes":["Delivery & schedule","Cost & funding","Commercial & supply chain","Governance & assurance"],"evidenceExcerpt":"The Contact Centre as a Service programme is rated Amber as it moves into mobilisation and discovery following supplier approval. The rating reflects known delivery risks, including maintaining service continuity during transition from legacy systems; ensuring sufficient delivery and integration capacity; achieving business readiness and adoption across…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"HMRC_0544_2526-Q2","year":2026,"name":"Contact Centre as a Service (CCaaS)","department":"HMRC","category":"Government Transformation and Service Delivery","description":"Contact Centre as a Service (CCaaS) is a programme to modernise HMRC’s contact centre technology. It will replace ageing systems with a secure, cloud‑based platform that makes it easier for customers to contact HMRC and for advisors to provide a better, more efficient service. CCaaS will improve call handling, digital contact options and service resilience, helping HMRC respond more effectively to customer demand while supporting future service improvements.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Contact Centre as a Service programme is rated Amber as it moves into mobilisation and discovery following supplier approval. The rating reflects known delivery risks, including maintaining service continuity during transition from legacy systems; ensuring sufficient delivery and integration capacity; achieving business readiness and adoption across operational teams; and dependency on timely deployment to realise benefits. These risks are understood and are being actively managed through phased delivery, strengthened business readiness activity, clear accountabilities, and ongoing governance and assurance. Delivery is being actively managed to maintain control of cost, scope and delivery assumptions, while strengthening capability and business readiness to support successful implementation and adoption. Ongoing assurance and governance arrangements are in place, with actions tracked to completion, providing confidence that the programme remains deliverable and that benefits will be realised as planned.","startDate":"2025-04-01","endDate":"2027-10-29","scheduleNarrative":"The schedule reflects the completion of procurement activity in line with plan and a continued focus on ensuring a safe and controlled transition from existing contact centre systems. The schedule continues to balance pace with service continuity, allowing sufficient time for implementation, testing and business readiness activities to minimise the risk of disruption to live services.","fyBaseline":6.33,"fyForecast":5.64,"fyVariance":10.87,"varianceNarrative":"The budget variance exceeds 5% and reflects the transition from early, high-level estimates to a more mature and assumption-led forecast. As delivery plans and commercial positions have developed, previously indicative budget assumptions have been revisited, with greater clarity on scope, profiling and cost drivers. As a result, the current forecast provides a more realistic and evidence-based view of expected spend, with variance mainly driven by improved definition and the reclassification of uncertain elements rather than a change in overall delivery ambition.","wholeLifeCost":571.86,"costNarrative":"The programme continues to deliver within its approved funding envelope. This reflects cost estimates that are consistent with the approved business case and the programme’s current stage, with costs being closely managed as the programme moves from procurement into delivery.","benefits":237.99,"benefitsNarrative":"The programme has defined its expected benefits, and is expected to improve service resilience, customer experience and operational efficiency and is taking action to ensure it is affordable, delivers value for money and is achievable. The programme is establishing clear, measurable benefits with accountable owners, alongside baselining current performance to enable robust tracking of benefits realisation. Full monetisation of benefits will be completed following supplier selection and finalisation of the detailed design and operating model, when implementation choices and delivery profiles are confirmed.","themes":["Delivery & schedule","Cost & funding","Commercial & supply chain","Governance & assurance"],"evidenceExcerpt":"The Contact Centre as a Service programme is rated Amber as it moves into mobilisation and discovery following supplier approval. The rating reflects known delivery risks, including maintaining service continuity during transition from legacy systems; ensuring sufficient delivery and integration capacity; achieving business readiness and adoption across…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":null,"ratingDelta":null,"transition":"Not comparable","endDateDeltaDays":null,"attentionScore":22,"attentionReasons":["Current published delivery confidence is Amber","In-year forecast variance is +10.9%"]},{"id":"MOJ_0050_2122-Q3","year":2026,"name":"Evolve: WAN/LAN (Networks)","department":"MOJ","category":"Information and Communications Technology (ICT)","description":"Re-procurement of WAN and LAN Services suitable for the current and future needs of the MoJ. The project includes requirements gathering, procurement preparation and competitive procurement followed by the transition of services and exit of the existing contracts.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25-Q4, the Delivery Confidence Assessment (DCA) rating at 25/26-Q4 has increased to Green. This is primarily due to increased time contingency within plans, and significant activities being either complete or in progress in line with project plans.","startDate":"2021-09-27","endDate":"2028-12-15","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end date at 25/26-Q4 changed from 16/08/28 to 15/12/28. This is primarily due to revision of planned activity timelines to increase contingency based on insights from lessons learned.","fyBaseline":31.48,"fyForecast":6.67,"fyVariance":78.81,"varianceNarrative":"The budget variance exceeds 5%. The underspend is due to reduced in-year activities, requiring costs to be re-profiled into future years.","wholeLifeCost":253.89,"costNarrative":"Compared to financial year 24/25-Q4, the project's Whole Life Costs at 25/26-Q4 has increased from £253.20m to £253.89. This is primarily due to delays resulting in cost increases. All costs have been reported in 2024/25 base prices in line with NISTA requirements. This is a change from previous years where costs were reported in nominal prices. All costs reflect this accounting reduction regardless of any actual changes.","benefits":107.62,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's monetised benefits at 25/26-Q4 have increased from £0 to £107.62m. This is primarily due to the following factors‚ confirmation of monetisation of benefits following approval of Full Business Case. All costs have been reported in 2024/25 base prices in line with NISTA requirements. This is a change from previous years where costs were reported in nominal prices. All costs will reflect this accounting reduction regardless of any actual changes.","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 24/25-Q4, the Delivery Confidence Assessment (DCA) rating at 25/26-Q4 has increased to Green. This is primarily due to increased time contingency within plans, and significant activities being either complete or in progress in line with project plans. Compared to financial year 24/25-Q4, the project's end date at 25/26-Q4 changed…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"MOJ_0050_2122-Q3","year":2022,"name":"Evolve Network Services","department":"MOJ","category":"ICT","description":"Re-procurement of WAN and LAN Services suitable for the current and future needs of the Authority, to replace the existing FITS WAN/LAN contract and comply with Public Procurement regulations. The project includes requirements gathering, ITT / Procurement preparation, competitive procurement followed by the transition of services and exit of the existing contracts.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Senior Responsible Owner Delivery Confidence Assessment rating at 21/22-Q4 is Amber. This is the first time data has been published for this project, which has been added to GMPP over the last year. The DCA is Amber primarily due to the following factors: Delays with the start of procurement for the LAN service.","startDate":"2021-09-27","endDate":"2026-08-30","scheduleNarrative":"Your project end-date is 30 AUG 2026. This is primarily due to the following factors: Project is still expecting to deliver to timescales.","fyBaseline":5.3,"fyForecast":1.53,"fyVariance":-71.0,"varianceNarrative":"The budget variance exceeds 5%. The variance is due to the staff costs being reviewed and found to be significantly lower. There has also been a delay in recruiting staff for the programme","wholeLifeCost":253.0,"costNarrative":"Your projects Baseline Whole Life Cost is 253.20 (£m). This is primarily due to the following factors: RDEL costs include Project costs (TUPE & In Housing Costs, Dual Running. LAN Proof of Concept & Model Office) and BAU running costs CDEL costs include Transition costs from the suppliers.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Workforce & capability","Commercial & supply chain"],"evidenceExcerpt":"The Senior Responsible Owner Delivery Confidence Assessment rating at 21/22-Q4 is Amber. This is the first time data has been published for this project, which has been added to GMPP over the last year. The DCA is Amber primarily due to the following factors: Delays with the start of procurement for the LAN service. Your project end-date is 30 AUG 2026.…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"MOJ_0050_2122-Q3","year":2023,"name":"Evolve: WAN/LAN (Networks)","department":"MOJ","category":"ICT","description":"Re-procurement of WAN and LAN Services suitable for the current and future needs of the Authority, to replace the existing Future IT Services WAN/ LAN. The project includes requirements gathering, ITT/Procurement preparation and competitive procurement followed by the transition of services and exit of the existing contracts.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 21/22-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. Compared to 21/22 Q4, the project's Delivery Confidence Assessment rating remained Amber. The Amber assessment is due to procurement timetable risks.","startDate":"2021-09-27","endDate":"2026-08-30","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2026-08-30. This is primarily due to the following factors. The project rebaselined in the financial year to reflect revised timescales.","fyBaseline":28.2,"fyForecast":7.6,"fyVariance":-73.0,"varianceNarrative":"The underspend is driven by commercial activity being rescheduled which has required costs to be re-profiled to future years.","wholeLifeCost":253.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 remained at 253m. This is primarily due to the following factors. The Whole Life Cost has remained static, and the budget remains aligned to the current baseline business case.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This project currently reports no monetised benefits. The project benefits focus on the continued quality of operation of network services contracts.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. Compared to 21/22 Q4, the project's Delivery Confidence Assessment rating remained Amber. The Amber assessment is due to procurement timetable risks. Compared to financial…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"MOJ_0050_2122-Q3","year":2024,"name":"Evolve: WAN/LAN (Networks)","department":"MOJ","category":"ICT","description":"Re-procurement of WAN and LAN Services suitable for the current and future needs of the Authority, to replace the existing Future IT Services WAN/ LAN. The project includes requirements gathering, Procurement preparation and competitive procurement followed by the transition of services and exit of the existing contracts.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. Timetable risks due to the complexity of multiple procurements.","startDate":"2021-09-27","endDate":"2028-02-24","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 increased from 2026-08-30 to 2028-02-24. This is primarily due to the following factors. The programme has rebaselined its schedule following a change of procurement approach.","fyBaseline":43.5,"fyForecast":13.09,"fyVariance":-70.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The underspend is due to the delay in procurement timelines, which has required costs to be re-profiled to future years","wholeLifeCost":253.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 remained at 253m. This is primarily due to the following factors. The Whole Life Cost has remained static, and the budget remains aligned to the current baseline business case.","benefits":0.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 0m. This project currently reports no monetised benefits. The project's benefits focus on the continued quality of operation of Network Services Contracts","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. Timetable risks due to the complexity of multiple procurements. Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 increased from 2026-08-30 to…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"MOJ_0050_2122-Q3","year":2025,"name":"Evolve: WAN/LAN (Networks)","department":"MoJ","category":"ICT","description":"Re-procurement of WAN and LAN Services suitable for the current and future needs of the Authority, to replace the existing Future IT Services WAN/ LAN. The project includes requirements gathering, Procurement preparation and competitive procurement followed by the transition of services and exit of the existing contracts.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Timetable risks due to complexity of multiple procurements mobilisations and limited schedule contingency.","startDate":"2021-09-27","endDate":"2028-08-16","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 24/02/2028 to 16/08/2028. This is primarily due to the following factors‚ The schedule was re-baselined due to complexity of multiple procurements mobilisations.","fyBaseline":39.0,"fyForecast":7.5,"fyVariance":80.77,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The underspend is due to reduced in-year activities requiring costs to be re-profiled into future years.","wholeLifeCost":253.2,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 253. This is primarily due to the following factors‚ The Whole Life Cost has remained static, and the budget remains aligned to the current baseline business case.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ This project currently reports no monetised benefits. Confirmation of monetised benefits will be aligned to approval of Full Business Case.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Timetable risks due to complexity of multiple procurements mobilisations and limited schedule contingency. Compared to financial year 23/24-Q4, the project's end-date…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"MOJ_0050_2122-Q3","year":2026,"name":"Evolve: WAN/LAN (Networks)","department":"MOJ","category":"Information and Communications Technology (ICT)","description":"Re-procurement of WAN and LAN Services suitable for the current and future needs of the MoJ. The project includes requirements gathering, procurement preparation and competitive procurement followed by the transition of services and exit of the existing contracts.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25-Q4, the Delivery Confidence Assessment (DCA) rating at 25/26-Q4 has increased to Green. This is primarily due to increased time contingency within plans, and significant activities being either complete or in progress in line with project plans.","startDate":"2021-09-27","endDate":"2028-12-15","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end date at 25/26-Q4 changed from 16/08/28 to 15/12/28. This is primarily due to revision of planned activity timelines to increase contingency based on insights from lessons learned.","fyBaseline":31.48,"fyForecast":6.67,"fyVariance":78.81,"varianceNarrative":"The budget variance exceeds 5%. The underspend is due to reduced in-year activities, requiring costs to be re-profiled into future years.","wholeLifeCost":253.89,"costNarrative":"Compared to financial year 24/25-Q4, the project's Whole Life Costs at 25/26-Q4 has increased from £253.20m to £253.89. This is primarily due to delays resulting in cost increases. All costs have been reported in 2024/25 base prices in line with NISTA requirements. This is a change from previous years where costs were reported in nominal prices. All costs reflect this accounting reduction regardless of any actual changes.","benefits":107.62,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's monetised benefits at 25/26-Q4 have increased from £0 to £107.62m. This is primarily due to the following factors‚ confirmation of monetisation of benefits following approval of Full Business Case. All costs have been reported in 2024/25 base prices in line with NISTA requirements. This is a change from previous years where costs were reported in nominal prices. All costs will reflect this accounting reduction regardless of any actual changes.","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 24/25-Q4, the Delivery Confidence Assessment (DCA) rating at 25/26-Q4 has increased to Green. This is primarily due to increased time contingency within plans, and significant activities being either complete or in progress in line with project plans. Compared to financial year 24/25-Q4, the project's end date at 25/26-Q4 changed…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"MOJ_0050_2122-Q3","year":2025,"name":"Evolve: WAN/LAN (Networks)","department":"MoJ","category":"ICT","description":"Re-procurement of WAN and LAN Services suitable for the current and future needs of the Authority, to replace the existing Future IT Services WAN/ LAN. The project includes requirements gathering, Procurement preparation and competitive procurement followed by the transition of services and exit of the existing contracts.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Timetable risks due to complexity of multiple procurements mobilisations and limited schedule contingency.","startDate":"2021-09-27","endDate":"2028-08-16","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 24/02/2028 to 16/08/2028. This is primarily due to the following factors‚ The schedule was re-baselined due to complexity of multiple procurements mobilisations.","fyBaseline":39.0,"fyForecast":7.5,"fyVariance":80.77,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The underspend is due to reduced in-year activities requiring costs to be re-profiled into future years.","wholeLifeCost":253.2,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 253. This is primarily due to the following factors‚ The Whole Life Cost has remained static, and the budget remains aligned to the current baseline business case.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ This project currently reports no monetised benefits. Confirmation of monetised benefits will be aligned to approval of Full Business Case.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Timetable risks due to complexity of multiple procurements mobilisations and limited schedule contingency. Compared to financial year 23/24-Q4, the project's end-date…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":-1,"transition":"Improved","endDateDeltaDays":121,"attentionScore":22,"attentionReasons":["Published end date moved 121 days later","In-year forecast variance is +78.8%"]},{"id":"DWP_0028_1819-Q3","year":2026,"name":"Health Transformation Programme","department":"DWP","category":"Government Transformation and Service Delivery","description":"The Health Transformation Programme (HTP) is delivering major improvements to disability benefit services by ensuring consistent outcomes, more efficient operation, and improved capacity. The Programme delivers coordinated change across four linked areas: the Personal Independence Payment (PIP) service, health assessments, health and employment support, and the delivery of wider welfare reforms. HTP will transform the Personal Independence Payment (PIP) service by simplifying customer journeys, improving how evidence is gathered and used, and strengthening decision making. These changes are intended to deliver timely and consistent outcomes, while reducing unnecessary reassessments, reconsiderations and appeals. In parallel, the Programme will implement a single, DWP‑owned, Health Assessment Service (HAS) for benefits requiring functional assessments. HAS will replace multiple provider systems with one integrated service ensuring consistency, improving efficiency and Healthcare Professional capacity, and enabling more face‑to‑face assessments where appropriate. HAS is a core element of the future PIP operating model and underpins improvements in decision making and service performance. HTP will test a strengthened health and employment support offer, focused on enabling disabled people and people with health conditions to move towards greater independence and participation where appropriate, while improving continuity across DWP's services. In addition, the Programme provides the operational, digital and assessment capability required to deliver Benefit Reform safely within live services. Reforms will be introduced through a suitably phased, test‑and‑learn approach, enabling the department to respond to emerging evidence and adapt to future policy decisions, including recommendations arising from the Timms Review, without destabilising services. The Programme has refined its Programme Objectives into five Strategic Outcomes, which continue to define how HTP will deliver its Programme Vision of ‘A high quality and efficient service that enables disabled people and those with health conditions to access the help, advice and support they need’. These Strategic Outcomes are: - Increased customer trust in services and decisions. - More efficient service with reduced demand for health assessments. - Increased take up of wider support and employment. - Improved customer experience with shorter journey times. - Transformed in-house data and IT infrastructure that is secure.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. The 6 critical recommendations raised following the Gate 0 NISTA review in Q4 24/25 have all now been implemented and reported back to NISTA. NISTA will conduct a further Gate 0 review this year.","startDate":"2018-03-28","endDate":"2029-09-28","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same. The programme end-date reflects the end date of the five-year Functional Assessment Service contracts, which run until September 2029.","fyBaseline":73.11,"fyForecast":65.08,"fyVariance":10.98,"varianceNarrative":"The Variance is exceeds 5%. This is primarily due to reductions in costs from streamlining Programme staffing levels, supplier contract costs being lower than initial estimates and an adjustment to the new PIP service scaling plans resulting in a reduction to the predicted level of support for Disability Services in 25/26.","wholeLifeCost":735.46,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life costs at 25/26-Q4 decreased to £0.735bn. This is due to removing the costs of the FAS & FAS IT projects, as the projects are now closed and no longer part of the Programme.","benefits":13925.44,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 decreased to £13.93bn. This is due to removing the benefits of the FAS & FAS IT projects which are now closed and no longer part of the Programme.","themes":["Cost & funding","Governance & assurance","Commercial & supply chain","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. The 6 critical recommendations raised following the Gate 0 NISTA review in Q4 24/25 have all now been implemented and reported back to NISTA. NISTA will conduct a further Gate 0 review this year. Compared to financial year 24/25-Q4,…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"DWP_0028_1819-Q3","year":2020,"name":"Health Transformation Programme","department":"DWP","category":"Government Transformation and Service Delivery","description":"To offer a more joined-up service to disabled people, the DWP Health Transformation Programme will be integrating the services that deliver PIP and Work Capability Assessments from 2021.nsform the health and disability services we provide for people with disabilities and health conditions.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Provision of�narrative�not possible due to prioritisation of Covid 19 response","startDate":"2018-03-28","endDate":"2024-03-31","scheduleNarrative":"Provision of�narrative�not possible due to prioritisation of Covid 19 response","fyBaseline":87.52,"fyForecast":66.38,"fyVariance":-24.0,"varianceNarrative":"Provision of�narrative�not possible due to prioritisation of Covid 19 response","wholeLifeCost":6598.76,"costNarrative":"Provision of�narrative�not possible due to prioritisation of Covid 19 response","benefits":null,"benefitsNarrative":"","themes":[],"evidenceExcerpt":"Provision of�narrative�not possible due to prioritisation of Covid 19 response Provision of�narrative�not possible due to prioritisation of Covid 19 response","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2020","sourceLabel":"IPA Annual Report 2019-20"},{"id":"DWP_0028_1819-Q3","year":2021,"name":"Health Transformation Programme","department":"DWP","category":"Government Transformation and Service Delivery","description":"To offer a more joined-up service to disabled people, the DWP Health Transformation Programme will be commissioning single suppliers of PIP and Work Capability Assessments in a given area from 2023. This will be an important step in improving the health and disability services we provide for people with disabilities and health conditions.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"The project is still at the planning stage and is not yet in a position to provide this information","startDate":null,"endDate":null,"scheduleNarrative":"The project is still at the planning stage and is not yet in a position to provide this information","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"The project is still at the planning stage and is not yet in a position to provide this information","wholeLifeCost":null,"costNarrative":"The project is still at the planning stage and is not yet in a position to provide this information","benefits":null,"benefitsNarrative":"","themes":[],"evidenceExcerpt":"The project is still at the planning stage and is not yet in a position to provide this information The project is still at the planning stage and is not yet in a position to provide this information","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21"},{"id":"DWP_0028_1819-Q3","year":2022,"name":"Health Transformation Programme","department":"DWP","category":"Government Transformation and Service Delivery","description":"The Health Transformation Programme is a critical part of the department's health and disability agenda. It will procure new functional assessment service contracts, modernise our service and be a key enabler for reform proposals detailed in the forthcoming White Paper. The Health Transformation Programme aims to deliver: A vastly improved claimant experience: including reduced journey times and improved claimant choice in terms of channel to claim. A more effective and efficient service for the taxpayer: reducing reliance on paper and integrating service delivery, reducing demand for health assessments by triaging. Greater capability to innovate and deliver change: including White Paper reform. All devolved benefits in Scotland, including Personal Independence Payment (PIP), are out of scope for the Health Transformation Programme.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 Amber. The Infrastructure Project Authority's input has been invaluable in ensuring successful progress. The three business cases (Functional Assessment Service, Functional Assessment Service IT and HTP Business Case) continue to evolve and the programme has completed an extensive re-plan of delivery activity to reflect these. However, the programme remains challenging and complex. As highlighted, key hotspots include short timescales for implementing the IT PIP Managed Service, procurement and transition to the Functional Assessment Service (FAS) itself and plans to extend the Health Transformation Area. Detailed contingency options for the FAS procurement are being developed, in case they are required.","startDate":"2018-03-28","endDate":"2028-12-29","scheduleNarrative":"Compared to 2021-Q4, your project end-date increased from 31 MAR 2024 to 29 DEC 2028 . This is primarily due to the following factors: The Programme schedule has been extended following an increase in scope and an agreed revised approach. During the COVID 19 outbreak the Programme was temporarily paused as people resources were deployed elsewhere to assist frontline operations. Following this, delivery activity was re-planned to cover: - Supporting policy reform and transformation ambitions across the end-to-end Personal Independence Payment journey and all functional health assessments. - Developing a new integrated service to deliver health assessments supported by a single digital platform developed by DWP. - Transforming the end-to-end PIP service, including introducing an option to apply online. - Procuring new Functional Assessment Services and the supporting IT for the period 2023-2028.","fyBaseline":57.97,"fyForecast":36.65,"fyVariance":-37.0,"varianceNarrative":"The budget variance exceeds 5%. 2021-22 Costs are lower than baseline as a result of challenges in bringing in resource coupled with changes in the plans and timetable for introducing operational initiatives meaning that the Programme did not incur the associated set up and recurring costs.","wholeLifeCost":3673.0,"costNarrative":"Compared to 2021-Q4, the projects Baseline Whole Life Cost decreased from 6598.77 (£m) to 3672.68 (£m). This is primarily due to the following factors: The previously reported whole life costs figure of £6598.77m was based on the strategic outline business case from 2018 and included operational costs which were not part of introducing change. The project has now developed revised business cases which only include the costs of the proposed changes to the service.","benefits":null,"benefitsNarrative":"","themes":["Delivery & schedule","Cost & funding","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 Amber. The Infrastructure Project Authority's input has been invaluable in ensuring successful progress. The three business cases (Functional Assessment Service, Functional Assessment Service IT and HTP Business Case) continue to…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"DWP_0028_1819-Q3","year":2023,"name":"Health Transformation Programme","department":"DWP","category":"Government Transformation and Service Delivery","description":"The Health Transformation Programme is a critical part of the department's disability strategy. It will procure new functional assessment service contracts, modernise our service and be a key enabler for reform proposals detailed in The Health and Disability White Paper published 16/03/23. The Health Transformation Programme aims to deliver: A vastly improved claimant experience: including reduced journey times and improved claimant choice in terms of channel to claim. A more effective and efficient service for the taxpayer: reducing reliance on paper and integrating service delivery, reducing demand for health assessments by triaging. Greater capability to innovate and deliver change: including White Paper reform. All devolved benefits in Scotland, including Personal Independence Payment (PIP), are out of scope for the Health Transformation Programme.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. With continued support from the Infrastructure Project Authority, HTP has progressed well with business case approval for Functional Assessment Service (FAS) and the Functional Assessment Service IT secured alongside comprehensive preparation for FAS to go live in 2024. The Department received a legal challenge to one of the FAS contract lots, which has delayed the procurement. However, a resolution has now been agreed with contracts still scheduled to be in place during 2023 to start in 2024. Following publication of the Health & Disability White Paper, HTP has been identified as a key delivery vehicle and work is underway to understand the impact. Plans to extend the Health Transformation Area are also underway and the next phase will be undertaken in close partnership with the new FAS providers. However, the programme remains challenging and complex so detailed scenario plans, that develop options for the most significant risks, have been developed so the programme has robust contingencies ready should they be needed.","startDate":"2018-03-28","endDate":"2029-03-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 increased from 2028-12-29 to 2029-03-31. This is primarily due to the following factors. The Programme schedule was previously extended as we made a short extension to the existing disability assessment services contracts, until March 2024, to facilitate the procurement and safe transition to the new contracts in order to prevent disruption to services. The Department then received a legal challenge to one of the FAS contract lots which has delayed the procurement. On 25th May the Department announced the outcome in three of the four contractual lots and procurement activity on the remaining lot has resumed, with contracts still scheduled to be in place during 2023 to start in 2024.","fyBaseline":125.99,"fyForecast":58.42,"fyVariance":-54.0,"varianceNarrative":"2022-23 Costs are lower than baseline as a result of challenges in bringing in resource coupled with changes in the plans and timetable for introducing operational initiatives meaning that the Programme did not incur the associated set up and recurring costs.","wholeLifeCost":3158.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 decreased from 3673m. to 3158m. This is primarily due to the following factors. Figures now reflect the outcome of the Functional Assessment Service (FAS) procurement exercise and the approved Final Business Case for the project.","benefits":5439.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 5439m. The reduction in benefits relates to an update on prior year benefits to the latest baseline position and the incorporation of FAS savings within FAS provider bids.","themes":["Commercial & supply chain","Cost & funding","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. With continued support from the Infrastructure Project Authority, HTP has progressed well with business case approval for Functional Assessment Service (FAS) and the…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"DWP_0028_1819-Q3","year":2024,"name":"Health Transformation Programme","department":"DWP","category":"Government Transformation and Service Delivery","description":"The Health Transformation Programme is a critical part of the department's disability strategy. It will procure new functional assessment service contracts, modernise our service and be a key enabler for reform proposals detailed in the forthcoming White Paper. The Health Transformation Programme aims to deliver: . A vastly improved claimant experience: including reduced journey times and improved claimant choice in terms of channel to claim. . A more effective and efficient service for the taxpayer: reducing reliance on paper and integrating service delivery, reducing demand for health assessments by triaging. . Greater capability to innovate and deliver change: including White Paper reform. . All devolved benefits in Scotland, including Personal Independence Payment (PIP), are out of scope for the Health Transformation Programme.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. The overall Programme rating is Amber due to the level of complexity and the current level of aggregate risk.","startDate":"2018-03-28","endDate":"2029-09-28","scheduleNarrative":"The project's end-date at 23/24-Q4 is 2029-09-28. This is primarily due to the following factors. The changed programme end-date reflects the end date of the Functional Assessment Service contracts, which run to this point. Due to delays in the procurement of the new contracts and the need to retain a sufficient implementation period, the start date of the new five-year contracts was delayed from March 2024 to September 2024.","fyBaseline":141.88,"fyForecast":93.72,"fyVariance":-34.0,"varianceNarrative":"The budget variance exceeds 5%. In-year actual variance to baseline results in the main from the fact that the Transformation baseline is still derived from the SOBC. Once the business case refresh has completed its full governance journey (Treasury Approval Point is awaited), it is expected that baselines and forecasts will be more closely aligned, with the variance reducing to -5% -10%, with the main cause being the delay in the FAS procurement.","wholeLifeCost":3165.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 increased from 3158m. to 3165m. This is primarily due to the following factors. FAS FBC refresh resulted in relatively minor increase to baselines costs.","benefits":5458.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 5458m.","themes":["Cost & funding","Approvals & decisions","Commercial & supply chain","Delivery & schedule"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. The overall Programme rating is Amber due to the level of complexity and the current level of aggregate risk. The project's end-date at 23/24-Q4 is 2029-09-28. This is primarily due to the following factors. The…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"DWP_0028_1819-Q3","year":2025,"name":"Health Transformation Programme","department":"DWP","category":"Government Transformation and Service Delivery","description":"The Health Transformation Programme (HTP) is transforming the service that supports over 2 million people with disabilities and health conditions who apply for health-related benefits every year, putting claimants at the heart of the service to provide the best possible experience (which is also more efficient and cost effective). We are concentrating on key areas including: • Providing greater choice for how Personal Independence Payment (PIP) assessments are conducted i.e. use of video assessments. We have already introduced telephone assessments – which can also be recorded upon request. • Better use of medical evidence and data-sharing. We will improve how we use information, including working more closely with the NHS and sharing data more effectively, improving the quality of decisions we make, and the level of support we can provide. • Better support and signposting. Making people aware of other benefits and services which could help them, so that they can more easily access the support they need. This can be particularly helpful when people are claiming benefits for the first time. • Reducing Disputes and Appeals. Mandatory Reconsiderations (MR) give people an early opportunity to challenge our decisions, with an effective MR process meaning fewer decisions going to appeal. Appeals are stressful and time-consuming for claimants, as well as costly for government. We want to improve the way we make decisions, focusing on how we gather information and make this available to everybody involved in the decision-making process. Objectives will be delivered across three broad areas of work: • Transformation of the entire PIP service, from finding out about benefits and eligibility through to applications, decisions and payments, aiming for all PIP new claims to go through the new service by 2029/30 • Development of a new approach to health assessments that is more efficient and tailored to customer needs that will be fully implemented by 2029/30 • HTP will play a key role in delivering the government’s Health & Disability reforms","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Following Gate 0 review in Q4 24/25, the IPA awarded HTP with an amber rating accompanied with 6 critical recommendations. This enabled the programme to proceed to the next stage, with the recommendations being progressed, and will report back to IPA/NISTA by end Q2 25/26.","startDate":"2018-03-28","endDate":"2029-09-28","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 28/09/2029. This is primarily due to the following factors‚ The programme end-date reflects the end date of the five-year Functional Assessment Service contracts, which run to September 29.","fyBaseline":367.42,"fyForecast":434.73,"fyVariance":18.32,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The adverse Variance of £67m is primarily driven by the Functional Assessment service (FAS) (£42m) where additional funding was secured from HMT in Spring 2024 to increase the volumes of assessments within the FAS contracts. This additional funding was not included in FAS business case and therefore is not part of the baseline. The remaining variance of £24m relates to FAS IT, where the Baseline reflects an original planned go-live in 2023/24. Go-live was subsequently delayed until September 2024 which resulted in a higher level of costs being incurred during 2024/25 than originally anticipated.","wholeLifeCost":2987.05,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 3165 to 2987. This is primarily due to the following factors‚ Movement is largely the result of updating baselines to reflect the latest HMT approved Programme Business Case (PBC).","benefits":18807.18,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 5458 to 18807. This is primarily due to the following factors‚ Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 5458 to 18807. This is primarily due to the following factors - Movement is largely the result of updating baselines to reflect the latest HMT approved Programme Business Case (PBC) which was based on the programme delivery plan to 2029/2030 as of August 2023. The updated programme business case includes wider societal savings driven by policy reform, which were not reflected in the programmes previous business case.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Following Gate 0 review in Q4 24/25, the IPA awarded HTP with an amber rating accompanied with 6 critical recommendations. This enabled the programme to proceed to…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"DWP_0028_1819-Q3","year":2026,"name":"Health Transformation Programme","department":"DWP","category":"Government Transformation and Service Delivery","description":"The Health Transformation Programme (HTP) is delivering major improvements to disability benefit services by ensuring consistent outcomes, more efficient operation, and improved capacity. The Programme delivers coordinated change across four linked areas: the Personal Independence Payment (PIP) service, health assessments, health and employment support, and the delivery of wider welfare reforms. HTP will transform the Personal Independence Payment (PIP) service by simplifying customer journeys, improving how evidence is gathered and used, and strengthening decision making. These changes are intended to deliver timely and consistent outcomes, while reducing unnecessary reassessments, reconsiderations and appeals. In parallel, the Programme will implement a single, DWP‑owned, Health Assessment Service (HAS) for benefits requiring functional assessments. HAS will replace multiple provider systems with one integrated service ensuring consistency, improving efficiency and Healthcare Professional capacity, and enabling more face‑to‑face assessments where appropriate. HAS is a core element of the future PIP operating model and underpins improvements in decision making and service performance. HTP will test a strengthened health and employment support offer, focused on enabling disabled people and people with health conditions to move towards greater independence and participation where appropriate, while improving continuity across DWP's services. In addition, the Programme provides the operational, digital and assessment capability required to deliver Benefit Reform safely within live services. Reforms will be introduced through a suitably phased, test‑and‑learn approach, enabling the department to respond to emerging evidence and adapt to future policy decisions, including recommendations arising from the Timms Review, without destabilising services. The Programme has refined its Programme Objectives into five Strategic Outcomes, which continue to define how HTP will deliver its Programme Vision of ‘A high quality and efficient service that enables disabled people and those with health conditions to access the help, advice and support they need’. These Strategic Outcomes are: - Increased customer trust in services and decisions. - More efficient service with reduced demand for health assessments. - Increased take up of wider support and employment. - Improved customer experience with shorter journey times. - Transformed in-house data and IT infrastructure that is secure.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. The 6 critical recommendations raised following the Gate 0 NISTA review in Q4 24/25 have all now been implemented and reported back to NISTA. NISTA will conduct a further Gate 0 review this year.","startDate":"2018-03-28","endDate":"2029-09-28","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same. The programme end-date reflects the end date of the five-year Functional Assessment Service contracts, which run until September 2029.","fyBaseline":73.11,"fyForecast":65.08,"fyVariance":10.98,"varianceNarrative":"The Variance is exceeds 5%. This is primarily due to reductions in costs from streamlining Programme staffing levels, supplier contract costs being lower than initial estimates and an adjustment to the new PIP service scaling plans resulting in a reduction to the predicted level of support for Disability Services in 25/26.","wholeLifeCost":735.46,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life costs at 25/26-Q4 decreased to £0.735bn. This is due to removing the costs of the FAS & FAS IT projects, as the projects are now closed and no longer part of the Programme.","benefits":13925.44,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 decreased to £13.93bn. This is due to removing the benefits of the FAS & FAS IT projects which are now closed and no longer part of the Programme.","themes":["Cost & funding","Governance & assurance","Commercial & supply chain","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. The 6 critical recommendations raised following the Gate 0 NISTA review in Q4 24/25 have all now been implemented and reported back to NISTA. NISTA will conduct a further Gate 0 review this year. Compared to financial year 24/25-Q4,…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"DWP_0028_1819-Q3","year":2025,"name":"Health Transformation Programme","department":"DWP","category":"Government Transformation and Service Delivery","description":"The Health Transformation Programme (HTP) is transforming the service that supports over 2 million people with disabilities and health conditions who apply for health-related benefits every year, putting claimants at the heart of the service to provide the best possible experience (which is also more efficient and cost effective). We are concentrating on key areas including: • Providing greater choice for how Personal Independence Payment (PIP) assessments are conducted i.e. use of video assessments. We have already introduced telephone assessments – which can also be recorded upon request. • Better use of medical evidence and data-sharing. We will improve how we use information, including working more closely with the NHS and sharing data more effectively, improving the quality of decisions we make, and the level of support we can provide. • Better support and signposting. Making people aware of other benefits and services which could help them, so that they can more easily access the support they need. This can be particularly helpful when people are claiming benefits for the first time. • Reducing Disputes and Appeals. Mandatory Reconsiderations (MR) give people an early opportunity to challenge our decisions, with an effective MR process meaning fewer decisions going to appeal. Appeals are stressful and time-consuming for claimants, as well as costly for government. We want to improve the way we make decisions, focusing on how we gather information and make this available to everybody involved in the decision-making process. Objectives will be delivered across three broad areas of work: • Transformation of the entire PIP service, from finding out about benefits and eligibility through to applications, decisions and payments, aiming for all PIP new claims to go through the new service by 2029/30 • Development of a new approach to health assessments that is more efficient and tailored to customer needs that will be fully implemented by 2029/30 • HTP will play a key role in delivering the government’s Health & Disability reforms","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Following Gate 0 review in Q4 24/25, the IPA awarded HTP with an amber rating accompanied with 6 critical recommendations. This enabled the programme to proceed to the next stage, with the recommendations being progressed, and will report back to IPA/NISTA by end Q2 25/26.","startDate":"2018-03-28","endDate":"2029-09-28","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 28/09/2029. This is primarily due to the following factors‚ The programme end-date reflects the end date of the five-year Functional Assessment Service contracts, which run to September 29.","fyBaseline":367.42,"fyForecast":434.73,"fyVariance":18.32,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The adverse Variance of £67m is primarily driven by the Functional Assessment service (FAS) (£42m) where additional funding was secured from HMT in Spring 2024 to increase the volumes of assessments within the FAS contracts. This additional funding was not included in FAS business case and therefore is not part of the baseline. The remaining variance of £24m relates to FAS IT, where the Baseline reflects an original planned go-live in 2023/24. Go-live was subsequently delayed until September 2024 which resulted in a higher level of costs being incurred during 2024/25 than originally anticipated.","wholeLifeCost":2987.05,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 3165 to 2987. This is primarily due to the following factors‚ Movement is largely the result of updating baselines to reflect the latest HMT approved Programme Business Case (PBC).","benefits":18807.18,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 5458 to 18807. This is primarily due to the following factors‚ Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 5458 to 18807. This is primarily due to the following factors - Movement is largely the result of updating baselines to reflect the latest HMT approved Programme Business Case (PBC) which was based on the programme delivery plan to 2029/2030 as of August 2023. The updated programme business case includes wider societal savings driven by policy reform, which were not reflected in the programmes previous business case.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Following Gate 0 review in Q4 24/25, the IPA awarded HTP with an amber rating accompanied with 6 critical recommendations. This enabled the programme to proceed to…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":0,"attentionScore":22,"attentionReasons":["Current published delivery confidence is Amber","In-year forecast variance is +11.0%"]},{"id":"BEIS_0005_1920-Q4","year":2026,"name":"Met Office Supercomputer Programme","department":"DSIT","category":"Information and Communications Technology (ICT)","description":"Delivering our future Supercomputing capability through the procurement and installation of a replacement and increased Supercomputing Capacity. This includes storage, observation networks, post processing systems and services, tooling for data exploitation delivery and support resources throughout the investment lifetime, data centre hosting, networking security services and decommissioning.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber This is primarily due to‚ supplier delivery delays have delayed our Science Plans which has impacted the service improvements leading to a risk in Socio Economic Benefits realisation.","startDate":"2018-01-01","endDate":"2032-07-11","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained at 11/07/2032 This is primarily due to the following factors‚ No changes to length of the supplier contractual agreement, this remains the closure target for this investment.","fyBaseline":91.18,"fyForecast":80.53,"fyVariance":11.68,"varianceNarrative":"The budget variance in year exceeds 5% due to supplier delays and therefore the re profiling of supplier milestone payments.","wholeLifeCost":1204.33,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) remained at £1242 to £1242 This is primarily due to the length of the contract being unchanged and we are developing interventions, redirecting the delayed spend to help recover at risk benefits. The delays are changing in year spend profiles, but this does not alter the expected whole life cost.","benefits":11904.44,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) decreased from £14,027 to 12,710 This is primarily due to the following factors: • Introduction of the new climate SEB methodology that has been updated to align with the updated approach, approved in the Valuing the Met Office (2024) Study, which itself was informed in 2024 when The Department for Energy Security and Net Zero (DESNZ) commissioned a study of the value of Met Office climate science and services as part of an evaluation of the value of the Hadley Centre Climate Programme. This revised approach was, in turn, incorporated into the 2024 study of the economic value of the Met Office, completed by London Economics. • Latest external economic data including latest GDP, inflation and Euro exchange figures from the March 2026 OBR Fiscal report and updated UK Airport Movement figures for 2025 from the Civil Aviation Authority.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber This is primarily due to‚ supplier delivery delays have delayed our Science Plans which has impacted the service improvements leading to a risk in Socio Economic Benefits realisation. Compared to financial year 24/25-Q4, the project's…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"BEIS_0005_1920-Q4","year":2021,"name":"Met Office Supercomputing 2020+ Programme","department":"BEIS","category":"ICT","description":"Delivering our future supercomputing capability through the procurement and installation of a replacement and increased supercomputing capacity to meet the contracted end of life timescales of our current systems. This will include: storage, observations networks, post-processing systems and services, tooling for data exploitation; delivery and support resources throughout the investment lifetime; data centre hosting, networking and security services.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber/Green.This is primarily due to the following factors: The programme continues to report as amber, due to the tight timescales and the complexity of the programme. The risk of delays are being mitigated where possible, we successfully passed the pre PIC panel in Dec and achieved FBC approval in Feruary 2021. Procurement process is nearing its final stages and the Programme has assigned a Programme Director and recruited a Programme Manager.","startDate":"2018-01-01","endDate":"2032-08-11","scheduleNarrative":"The project end-date is 11 August 2032. This is primarily due to the following factors: The programme is expected to sign the contract for this investment on 16-Apr-21 as scheduled.. The schedule is baselined at that point and at present there are no expected deviations.","fyBaseline":6.9,"fyForecast":6.9,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%. There is currently no budget variance. Full term forecast now entered to reflect preferred bidder costings. Final Business Case approval confirmed so programme has been re-baselined to reflect this new approval.","wholeLifeCost":1242.05,"costNarrative":"The projects Baseline Whole Life Cost is �1242.05m. This is primarily due to the following factors: Overall programme costs are just over �20m higher than last submission reflecting the new approval. Cost increase is due to programme estimates across all aspects of the programme being higher than in original submissions, partly as a result of the winning bidders technical solution.","benefits":null,"benefitsNarrative":"","themes":["Approvals & decisions","Cost & funding","Commercial & supply chain","Delivery & schedule"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber/Green.This is primarily due to the following factors: The programme continues to report as amber, due to the tight timescales and the complexity of the programme. The risk of delays are being mitigated where possible, we successfully passed the pre PIC panel in Dec and…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21"},{"id":"BEIS_0005_1920-Q4","year":2022,"name":"Met Office Supercomputing 2020+ Programme","department":"BEIS","category":"ICT","description":"Delivering our future supercomputing capability through the procurement and installation of a replacement and increased supercomputing capacity to meet the contracted end of life timescales of our current systems. This will include storage, observations networks, post processing systems and services, tooling for data exploitation, delivery and support resources throughout the investment lifetime, data centre hosting, networking, security services and decommissioning .","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 20/21-Q4, the Delivery Confidence Assessment rating at 21/22-Q4 increased from Amber/Green to Amber Procurement phase and approval phase is complete and we are into the delivery phase of the programme. The last review was in Dec 2020, those actions have been met.","startDate":"2018-01-01","endDate":"2032-08-11","scheduleNarrative":"Compared to 2021-Q4, your project end-date remained scheduled to finish on 11 AUG 2032 . This is primarily due to the following factors: We have experienced supplier delays which had delayed our key implementation milestones, this was due to supply chain issues on behalf of the supplier and their sub contractors. A replanning exercise is due to be completed imminently.","fyBaseline":37.07,"fyForecast":18.08,"fyVariance":-51.0,"varianceNarrative":"The programme is under spent, this year as delays to the implementation have caused key milestones and subsequent payment to move into later years.","wholeLifeCost":1242.0,"costNarrative":"Compared to 2021-Q4,the projects Baseline Whole Life Cost remained at 1242.05 (£m). This is primarily due to the following factors: Whole life baseline costs remain unchanged, but due to supplier delays we are showing a reduction in the forecast as costs are re profiled.","benefits":null,"benefitsNarrative":"","themes":["Commercial & supply chain","Cost & funding","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Delivery Confidence Assessment rating at 21/22-Q4 increased from Amber/Green to Amber Procurement phase and approval phase is complete and we are into the delivery phase of the programme. The last review was in Dec 2020, those actions have been met. Compared to 2021-Q4, your project end-date remained scheduled to…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"BEIS_0005_1920-Q4","year":2023,"name":"Met Office Supercomputing 2020+ Programme","department":"DSIT","category":"ICT","description":"Delivering our future supercomputing capability through the procurement and installation of a replacement and increased supercomputing capacity. This includes storage, observation networks, post processing systems and services, tooling for data exploitation delivery and support resources throughout the investment lifetime, data centre hosting, networking security services and decommissioning .","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 21/22-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. Procurement and approval phase are complete and we are now in the delivery phase of the Programme. IPA actions have been completed","startDate":"2018-01-01","endDate":"2032-08-11","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2032-08-11. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2032-08-11. This is primarily due to the following factors. We have experienced supplier delays which had delayed our key implementation milestones, this was due to supply chain issues on behalf of the supplier and their sub contractors. A re-planning exercise is currently being completed with the supplier and should conclude by the end of April. The project end date remains the same","fyBaseline":191.09,"fyForecast":48.24,"fyVariance":-75.0,"varianceNarrative":"The Programme is under spent this year as delays to implementation have caused key milestones and subsequent payments to move into later years.","wholeLifeCost":1242.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 remained at 1242m. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 remained at 1242m. This is primarily due to the following factors. Whole life baseline costs remain the unchanged, but due to supplier delays we are showing a reduction in the forecast as costs are re profiled.","benefits":17874.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 17874m. Benefits forecast has been amended primarily based on the delays to implementation.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. Procurement and approval phase are complete and we are now in the delivery phase of the Programme. IPA actions have been completed Compared to financial year 21/22-Q4, the…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"BEIS_0005_1920-Q4","year":2024,"name":"Met Office Supercomputing 2020+ Programme","department":"DSIT","category":"ICT","description":"Delivering our future Supercomputing capability through the procurement and installation of a replacement and increased Supercomputing Capacity. This includes storage, observation networks, post processing systems and services, tooling for data exploitation delivery and support resources throughout the investment lifetime, data centre hosting, networking security services and decommissioning.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. IPA Gate 4 took place in February with a Green Rating. Four recommendations were made all of which are underway.","startDate":"2018-01-01","endDate":"2032-07-11","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 decreased from 2032-08-11 to 2032-07-11. This is primarily due to the following factors. We have experienced substantial supplier delays which has delayed key implementation milestones. These delays have been due to supply chain issues and supplier performance. A re planning exercise is underway and we expect to have newly formalised plan by the end of April. The project end date remains the same.","fyBaseline":100.94,"fyForecast":47.53,"fyVariance":-53.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The programme is underspent due to due to substantial supplier delays that have caused milestones and subsequent payments to move into later years.","wholeLifeCost":1242.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 remained at 1242m. This is primarily due to the following factors. Whole life baseline costs remain unchanged, but due to significant supplier delays we are showing a reduction in the forecast as the costs are re profiled.","benefits":16802.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 2324-Q4 decreased from 17874m. to 16802m. Benefits forecast has been amended primarily based on the delays to implementation.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. IPA Gate 4 took place in February with a Green Rating. Four recommendations were made all of which are underway. Compared to financial year 22/23-Q4, the project's end-date…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"BEIS_0005_1920-Q4","year":2025,"name":"Met Office Supercomputer Programme","department":"DSIT","category":"ICT","description":"Delivering our future Supercomputing capability through the procurement and installation of a replacement and increased Supercomputing Capacity. This includes storage, observation networks, post processing systems and services, tooling for data exploitation delivery and support resources throughout the investment lifetime, data centre hosting, networking security services and decommissioning.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Supplier delivery delays have delayed our science plans which has impacted the service improvements leading to a risk of reduction in Socio Economic Benefits.","startDate":"2018-01-01","endDate":"2032-07-11","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 11/07/2032. This is primarily due to the following factors‚ No changes to length of the supplier contractual agreement, this remains the closure target for this investment.","fyBaseline":95.23,"fyForecast":100.25,"fyVariance":5.27,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ Supplier delays have meant that the financial profile has changed, as delivery milestones and associated payments have moved to a later date.","wholeLifeCost":1242.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 1242. This is primarily due to the following factors‚ The length of the contract is unchanged and we are developing interventions, redirecting the delayed spend to help recover at risk benefits. The delays are changing in year spend profiles, but this does not alter the expected whole life cost.","benefits":null,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) decreased from 16802 to 11203. This is primarily due to the following factors‚ Supplier delivery delays have meant that benefits are at risk of not being fully achieved, within the agreed investment window.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Supplier delivery delays have delayed our science plans which has impacted the service improvements leading to a risk of reduction in Socio Economic Benefits.…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"BEIS_0005_1920-Q4","year":2026,"name":"Met Office Supercomputer Programme","department":"DSIT","category":"Information and Communications Technology (ICT)","description":"Delivering our future Supercomputing capability through the procurement and installation of a replacement and increased Supercomputing Capacity. This includes storage, observation networks, post processing systems and services, tooling for data exploitation delivery and support resources throughout the investment lifetime, data centre hosting, networking security services and decommissioning.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber This is primarily due to‚ supplier delivery delays have delayed our Science Plans which has impacted the service improvements leading to a risk in Socio Economic Benefits realisation.","startDate":"2018-01-01","endDate":"2032-07-11","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained at 11/07/2032 This is primarily due to the following factors‚ No changes to length of the supplier contractual agreement, this remains the closure target for this investment.","fyBaseline":91.18,"fyForecast":80.53,"fyVariance":11.68,"varianceNarrative":"The budget variance in year exceeds 5% due to supplier delays and therefore the re profiling of supplier milestone payments.","wholeLifeCost":1204.33,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) remained at £1242 to £1242 This is primarily due to the length of the contract being unchanged and we are developing interventions, redirecting the delayed spend to help recover at risk benefits. The delays are changing in year spend profiles, but this does not alter the expected whole life cost.","benefits":11904.44,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) decreased from £14,027 to 12,710 This is primarily due to the following factors: • Introduction of the new climate SEB methodology that has been updated to align with the updated approach, approved in the Valuing the Met Office (2024) Study, which itself was informed in 2024 when The Department for Energy Security and Net Zero (DESNZ) commissioned a study of the value of Met Office climate science and services as part of an evaluation of the value of the Hadley Centre Climate Programme. This revised approach was, in turn, incorporated into the 2024 study of the economic value of the Met Office, completed by London Economics. • Latest external economic data including latest GDP, inflation and Euro exchange figures from the March 2026 OBR Fiscal report and updated UK Airport Movement figures for 2025 from the Civil Aviation Authority.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber This is primarily due to‚ supplier delivery delays have delayed our Science Plans which has impacted the service improvements leading to a risk in Socio Economic Benefits realisation. Compared to financial year 24/25-Q4, the project's…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"BEIS_0005_1920-Q4","year":2025,"name":"Met Office Supercomputer Programme","department":"DSIT","category":"ICT","description":"Delivering our future Supercomputing capability through the procurement and installation of a replacement and increased Supercomputing Capacity. This includes storage, observation networks, post processing systems and services, tooling for data exploitation delivery and support resources throughout the investment lifetime, data centre hosting, networking security services and decommissioning.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Supplier delivery delays have delayed our science plans which has impacted the service improvements leading to a risk of reduction in Socio Economic Benefits.","startDate":"2018-01-01","endDate":"2032-07-11","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 11/07/2032. This is primarily due to the following factors‚ No changes to length of the supplier contractual agreement, this remains the closure target for this investment.","fyBaseline":95.23,"fyForecast":100.25,"fyVariance":5.27,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ Supplier delays have meant that the financial profile has changed, as delivery milestones and associated payments have moved to a later date.","wholeLifeCost":1242.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 1242. This is primarily due to the following factors‚ The length of the contract is unchanged and we are developing interventions, redirecting the delayed spend to help recover at risk benefits. The delays are changing in year spend profiles, but this does not alter the expected whole life cost.","benefits":null,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) decreased from 16802 to 11203. This is primarily due to the following factors‚ Supplier delivery delays have meant that benefits are at risk of not being fully achieved, within the agreed investment window.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Supplier delivery delays have delayed our science plans which has impacted the service improvements leading to a risk of reduction in Socio Economic Benefits.…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":0,"attentionScore":22,"attentionReasons":["Current published delivery confidence is Amber","In-year forecast variance is +11.7%"]},{"id":"DHSC_0069_2021-Q4","year":2026,"name":"NHS Digital Transformation of Screening","department":"DHSC","category":"Government Transformation and Service Delivery","description":"NHS England is transforming the digital services that support the national screening programmes. This work replaces paper-based processes and outdated technology with modern digital services designed to be secure, reliable and easier to use. The new services help people better understand and manage their screening information, including their history and appointments, and support staff by automating manual processes, improving how screening services are managed and delivered. This transformation programme has designed and delivered shared digital services for screening programmes, alongside support for people who may need help accessing digital services and wider service improvements. The work also implements key recommendations from the 2019 independent review of screening led by Professor Sir Mike Richards. This phase of the programme closes at the end of March 2026.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The programme’s Delivery Confidence Assessment (DCA) rating remains Amber, reflecting the challenges associated with the scale and complexity of the transformation, while confirming that its objectives remain achievable. Since HM Treasury approval of the Programme Business Case in July 2023, the programme has made significant progress in modernising national screening services. Key milestones met include the introduction of digital communications for cervical and bowel screening programmes, and progress towards digital breast screening and human papillomavirus (HPV) self-testing. IPA/NISTA gateway reviews in 2025 and 2026 confirmed that delivery remains feasible. The programme is within budget and continues to progress toward its goals of improving screening safety and participation, modernising technology, and delivering more efficient, innovative services.","startDate":"2022-04-01","endDate":"2033-03-30","scheduleNarrative":"A Programme Business Case (PBC) Addendum extended spend approval to March 2026, to allow time for the full PBC refresh following the 2025 Spending Review. Delivery has progressed well, with new digital services for cervical, and bowel screening deployed, and services such as Manage Breast Screening. The programme is now transitioning to be part of the wider Transforming Patient, Public and Staff-facing Services programme from April 2026, which will retain existing organisational and governance arrangements to support continued delivery.","fyBaseline":33.8,"fyForecast":37.68,"fyVariance":11.46,"varianceNarrative":"£2.7m of in-year variance is driven by an accounting adjustment following reassessment of spend capitalised in prior years, resulting in an in-year Revenue charge. The remaining overspend of £1.3m equates to 3.7% and is within the optimism bias value of the case.","wholeLifeCost":94.5,"costNarrative":"The original WLC estimate set in the original 2023 PBC, with one off cost spend due to end March 29. This was updated in the PBC Addendum to a one off cost spend ending in Mar 26, which reduced the WLC. This reflects the decision to replace the DToS programme with a new, larger programme that included investment for screening alongside other areas of investment.","benefits":3767.13,"benefitsNarrative":"Compared to financial year 24/25-Q4, the programme's departmental benefits estimate at 25/26-Q4 has decreased . The main drivers for the change in benefits estimation for the programme are: - Changes to the treatment of QUALY benefits, figures have been updated with 25/26 actuals and onward forecasting aligned with the wider Transforming Patient, Public and Staff-facing Services programme business case.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Technical & integration"],"evidenceExcerpt":"The programme’s Delivery Confidence Assessment (DCA) rating remains Amber, reflecting the challenges associated with the scale and complexity of the transformation, while confirming that its objectives remain achievable. Since HM Treasury approval of the Programme Business Case in July 2023, the programme has made significant progress in modernising…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"DHSC_0069_2021-Q4","year":2024,"name":"Digital Transformation of Screening_old","department":"DHSC","category":"Government Transformation and Service Delivery","description":"The Digital Transformation of Screening Programme (DToS), covers work required to design, develop and deliver new shared screening services and supporting digital products and assisted digital support, and the associated change delivery. _x000D_ _x000D_ Our vision aims to implement key recommendations in Professor Sir Mike Richards 2019 review which set out the need to improve IT systems to support the safe and effective delivery of screening services.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 is Red. This is primarily due to the following factors. The programme continues to report Red although significant progress has been made, transitioning the programme into its delivery phase. The initial Statement of Work with the screening delivery partner was approved and has begun. From the end of January 2024, teams have been onboarding and teams are now fully mobilised._x000D_ _x000D_ _x000D_ Over the coming months the following actions are planned to further improve the RAG rating:_x000D_ -Confirmation of 2024/25 budget for the programme_x000D_ -Development of the Release 0 detailed delivery plan completed and pilot locations agreed_x000D_ -Design and build of CaaS Integration Service to transition the cohorting service for Breast Screening and Diabetic Eye Screening_x000D_ -Plan and scope outlined to utilise Breast Screening Select to support DToS Releases_x000D_ -Continue to monitor the progress of SoW approvals and push for prompt sign off at each stage","startDate":"2022-04-01","endDate":"2033-03-30","scheduleNarrative":"The project's end-date at 23/24-Q4 is 2033-03-30. This is primarily due to the following factors. The project's end-date at 23/24-Q4 is schedule to finish on 30-MAR-2033. This is the date of the programme lifetime, the programme is a 10 year planned programme to deliver digital transformation to other screening services, not just the Breast and Diabetic eye that is mentioned in the current reporting. As per the options discussed in the current PBC there is remaining services that will benefit from Digital Transformation, AAA, Bowel, Lung, Grail, AN + NB, Cervical) and prioritisation of these will take place in further options appraisals in the following PBC's that will be presented to HMT","fyBaseline":31.2,"fyForecast":7.72,"fyVariance":-75.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The budget variance exceeds 5%. This is primarily due to the delay in onboarding of external suppliers costs have been pushed into following years. However, Costs are now refined to reflect actual year end position for the year after bringing in IBM back on board in Jan 24. _x000D_ The main increase since last submission in M09 is due to continuation of Cohorting as a Service Live Services recharge for Cohort Manager running from FY24/25-FY25/26 (2m)_x000D_ There maybe a further tweak over the next 2 months to March 24 as we continue to finalise spending.","wholeLifeCost":113.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 23/24-Q4 is 113m. This is primarily due to the following factors. Baseline whole life costs remain in line with the latest approved business case","benefits":610.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 610m. The project departmental-agree Benefits at 23/24-Q4 is 0. This is primarily due to NHS England has been slower than envisaged in the business case to start the project.","themes":["Delivery & schedule","Cost & funding","Technical & integration","Scope & requirements"],"evidenceExcerpt":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 is Red. This is primarily due to the following factors. The programme continues to report Red although significant progress has been made, transitioning the programme into its delivery phase. The initial Statement of Work with the screening delivery partner was approved and has…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"DHSC_0069_2021-Q4","year":2025,"name":"NHS Digital Transformation of Screening","department":"DHSC","category":"Government Transformation and Service Delivery","description":"The NHS Digital Transformation of Screening Programme (DToS), covers work required to design, develop and deliver new shared screening services and supporting digital products and assisted digital support, and the associated change delivery. Our vision aims to implement key recommendations in Professor Sir Mike Richards review which set out the need to improve IT systems to support the safe and effective delivery of screening services.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from RED to AMBER. This is primarily due to the following factors‚ the programme having now commenced delivery with new digital products being developed, tested and scaled. There is work in progress to secure future funding beyond 2025/6 and agree a commercial approach for technology and other partners beyond 25/26.","startDate":"2022-04-01","endDate":"2033-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 30/03/2033 to 31/03/2033. This is primarily due to the following factors‚ This a 10 year change programme to deliver digital transformation of all the national screening programmes. Following the Programme Business Case (PBC) approval in July 2023, lengthy commercial approval processes meant the mobilisation of the strategic delivery partner/supplier did not start until early 2024 and was only fully mobilised in June 2024.","fyBaseline":25.0,"fyForecast":24.8,"fyVariance":0.8,"varianceNarrative":"The budget variance is less than or equal to 5%. The budget variance was 0.8% within the 5% variance. The budget was reduced mid-year to £19m, then there was a late allocation of additional capital. Despite this the budget variance at the end of the financial year was less than 1%.","wholeLifeCost":106.69,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 113 to 106. This is primarily due to the following factors‚ The programme Baseline Whole Life Cost is currently 108.69 (£m). The forecast cost is £250.69.The forecast expenditure is aligned with the spending review, February 2025, to include costs up until 2028/29. This a bid only, however this won't be known until the funding allocation for the next spending review period is confirmed. The funding up until 25/26 is confirmed.","benefits":15808.5,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 610 to 15808. This is primarily due to the following factors‚ Benefits have been aligned to spending review submission, February 2025, which includes additional scope beyond the currently approved business case, which run to March 2026. Benefits include the full societal benefits of early treatment of additional cancers to be detected and productivity savings from moving to digital communications and other tools. Confidence adjustments applied to all benefits following NHSE Transformation Portfolio Office assurance of the Business Case Addendum December 2024.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from RED to AMBER. This is primarily due to the following factors‚ the programme having now commenced delivery with new digital products being developed, tested and scaled. There is work in progress to secure future funding…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"DHSC_0069_2021-Q4","year":2026,"name":"NHS Digital Transformation of Screening","department":"DHSC","category":"Government Transformation and Service Delivery","description":"NHS England is transforming the digital services that support the national screening programmes. This work replaces paper-based processes and outdated technology with modern digital services designed to be secure, reliable and easier to use. The new services help people better understand and manage their screening information, including their history and appointments, and support staff by automating manual processes, improving how screening services are managed and delivered. This transformation programme has designed and delivered shared digital services for screening programmes, alongside support for people who may need help accessing digital services and wider service improvements. The work also implements key recommendations from the 2019 independent review of screening led by Professor Sir Mike Richards. This phase of the programme closes at the end of March 2026.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The programme’s Delivery Confidence Assessment (DCA) rating remains Amber, reflecting the challenges associated with the scale and complexity of the transformation, while confirming that its objectives remain achievable. Since HM Treasury approval of the Programme Business Case in July 2023, the programme has made significant progress in modernising national screening services. Key milestones met include the introduction of digital communications for cervical and bowel screening programmes, and progress towards digital breast screening and human papillomavirus (HPV) self-testing. IPA/NISTA gateway reviews in 2025 and 2026 confirmed that delivery remains feasible. The programme is within budget and continues to progress toward its goals of improving screening safety and participation, modernising technology, and delivering more efficient, innovative services.","startDate":"2022-04-01","endDate":"2033-03-30","scheduleNarrative":"A Programme Business Case (PBC) Addendum extended spend approval to March 2026, to allow time for the full PBC refresh following the 2025 Spending Review. Delivery has progressed well, with new digital services for cervical, and bowel screening deployed, and services such as Manage Breast Screening. The programme is now transitioning to be part of the wider Transforming Patient, Public and Staff-facing Services programme from April 2026, which will retain existing organisational and governance arrangements to support continued delivery.","fyBaseline":33.8,"fyForecast":37.68,"fyVariance":11.46,"varianceNarrative":"£2.7m of in-year variance is driven by an accounting adjustment following reassessment of spend capitalised in prior years, resulting in an in-year Revenue charge. The remaining overspend of £1.3m equates to 3.7% and is within the optimism bias value of the case.","wholeLifeCost":94.5,"costNarrative":"The original WLC estimate set in the original 2023 PBC, with one off cost spend due to end March 29. This was updated in the PBC Addendum to a one off cost spend ending in Mar 26, which reduced the WLC. This reflects the decision to replace the DToS programme with a new, larger programme that included investment for screening alongside other areas of investment.","benefits":3767.13,"benefitsNarrative":"Compared to financial year 24/25-Q4, the programme's departmental benefits estimate at 25/26-Q4 has decreased . The main drivers for the change in benefits estimation for the programme are: - Changes to the treatment of QUALY benefits, figures have been updated with 25/26 actuals and onward forecasting aligned with the wider Transforming Patient, Public and Staff-facing Services programme business case.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Technical & integration"],"evidenceExcerpt":"The programme’s Delivery Confidence Assessment (DCA) rating remains Amber, reflecting the challenges associated with the scale and complexity of the transformation, while confirming that its objectives remain achievable. Since HM Treasury approval of the Programme Business Case in July 2023, the programme has made significant progress in modernising…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"DHSC_0069_2021-Q4","year":2025,"name":"NHS Digital Transformation of Screening","department":"DHSC","category":"Government Transformation and Service Delivery","description":"The NHS Digital Transformation of Screening Programme (DToS), covers work required to design, develop and deliver new shared screening services and supporting digital products and assisted digital support, and the associated change delivery. Our vision aims to implement key recommendations in Professor Sir Mike Richards review which set out the need to improve IT systems to support the safe and effective delivery of screening services.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from RED to AMBER. This is primarily due to the following factors‚ the programme having now commenced delivery with new digital products being developed, tested and scaled. There is work in progress to secure future funding beyond 2025/6 and agree a commercial approach for technology and other partners beyond 25/26.","startDate":"2022-04-01","endDate":"2033-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 30/03/2033 to 31/03/2033. This is primarily due to the following factors‚ This a 10 year change programme to deliver digital transformation of all the national screening programmes. Following the Programme Business Case (PBC) approval in July 2023, lengthy commercial approval processes meant the mobilisation of the strategic delivery partner/supplier did not start until early 2024 and was only fully mobilised in June 2024.","fyBaseline":25.0,"fyForecast":24.8,"fyVariance":0.8,"varianceNarrative":"The budget variance is less than or equal to 5%. The budget variance was 0.8% within the 5% variance. The budget was reduced mid-year to £19m, then there was a late allocation of additional capital. Despite this the budget variance at the end of the financial year was less than 1%.","wholeLifeCost":106.69,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 113 to 106. This is primarily due to the following factors‚ The programme Baseline Whole Life Cost is currently 108.69 (£m). The forecast cost is £250.69.The forecast expenditure is aligned with the spending review, February 2025, to include costs up until 2028/29. This a bid only, however this won't be known until the funding allocation for the next spending review period is confirmed. The funding up until 25/26 is confirmed.","benefits":15808.5,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 610 to 15808. This is primarily due to the following factors‚ Benefits have been aligned to spending review submission, February 2025, which includes additional scope beyond the currently approved business case, which run to March 2026. Benefits include the full societal benefits of early treatment of additional cancers to be detected and productivity savings from moving to digital communications and other tools. Confidence adjustments applied to all benefits following NHSE Transformation Portfolio Office assurance of the Business Case Addendum December 2024.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from RED to AMBER. This is primarily due to the following factors‚ the programme having now commenced delivery with new digital products being developed, tested and scaled. There is work in progress to secure future funding…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":-1,"attentionScore":22,"attentionReasons":["Current published delivery confidence is Amber","In-year forecast variance is +11.5%"]},{"id":"DWP_0029_2021-Q4","year":2026,"name":"PENSIONS DASHBOARD PROGRAMME","department":"DWP","category":"Information and Communications Technology (ICT)","description":"The Pensions Dashboards Programme (PDP) is being delivered by the Money and Pensions Service (MaPS). PDP is an enabling programme, delivering the central digital architecture, standards and governance arrangements necessary for the dashboards ecosystem to operate. The pensions dashboards service will enable individuals to access their pensions information online, securely and all in one place, thereby supporting better planning for retirement and growing financial wellbeing. Dashboards will provide clear and simple information about an individual's multiple pension savings, including their State Pension. They will also help them to reconnect with any lost pensions.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25, the NISTA/SRO Delivery Confidence Assessment rating at 25/26-Q4 remained at AMBER. This is primarily due to the following factors: The Amber rating reflects the delivery confidence assessment and findings of the most recent NISTA review held in March 2026, which noted the excellent progress made to date and found no blockers to delivery. Over the past twelve months we have made significant progress with onboarding pension schemes and providers to the central digital architecture with over 1,000 now connected, which represents over 60 million records or three quarters of those within scope; and are supporting MaPS colleagues with consumer testing for the MoneyHelper Pensions Dashboard, the first dashboard that will be made available, to demonstrate that the end-to-end service meets users' needs. In parallel, we are working with the regulators, DWP and other potential dashboard providers to develop the process and standards necessary to support other dashboards in the future. We are also putting in place transition arrangements, embedding the necessary governance arrangements, practices and procedures to manage Programme closedown and for the central digital architecture to operate as a business as usual activity.","startDate":"2019-04-01","endDate":"2027-03-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same and is scheduled to be 31/03/2027. This is primarily due to the following factors‚ the Programme is on track to deliver its objectives by the scheduled end date of March 2027. Good progress made with the connection of pension schemes and providers to the ecosystem, citizen testing well advanced, and solid progress with the arrangements for transition and Programme closedown.","fyBaseline":34.29,"fyForecast":30.45,"fyVariance":11.19,"varianceNarrative":"The budget variance exceeds 5%. FY 2025/26 in-year spend of £30.63m (real values) as of Q4 reporting was c£4m lower than £34.49m (real values) Departmental Baseline, resulting in variance of 11%. This was driven by the delivery of additional change work identified during programme reset. This increase in costs within the financial year was approved by the Department in October 2025.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Exempt under Section 35 - Formulation of government policy","themes":["Delivery & schedule","Cost & funding","Technical & integration","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25, the NISTA/SRO Delivery Confidence Assessment rating at 25/26-Q4 remained at AMBER. This is primarily due to the following factors: The Amber rating reflects the delivery confidence assessment and findings of the most recent NISTA review held in March 2026, which noted the excellent progress made to date and found no…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"DWP_0029_2021-Q4","year":2021,"name":"Pensions Dashboard Programme","department":"DWP","category":"ICT","description":"Pensions dashboards will enable individuals to access their pensions information online, securely and all in one place, thereby supporting better planning for retirement and growing financial wellbeing. Dashboards will provide clear and simple information about an individual's multiple pension savings, including their State Pension. They will also help them to reconnect with any lost pots. The Pensions Dashboards Programme has been established to design and implement the infrastructure that will make pensions dashboards work, and the governance framework to support its operation.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber.This is primarily due to the following factors: The Amber rating reflects the balance of progress made to date and the levels of risk being carried. We have successfully delivered the first iteration of data standards, significant progress to commencing two large procurement exercises and supported DWP in the passing of the Pensions Schemes Act 2021, all significant milestones. We recognise the complexities involved in designing and delivering a service that will work for consumers whilst minimising the burden on the industry. We are working with our public sector and industry delivery partners to continuously improve our working practices, to identify dependencies and manage risks. Successful stakeholder communications channels and engagement strategies will be critical to meeting these challenges over the year ahead.","startDate":"2019-04-01","endDate":"2025-03-31","scheduleNarrative":"The project end-date is 31 March 2025. This is primarily due to the following factors: Programme planning assumptions remain consistent with those contained in our Programme Update Report, published on the Pensions Dashboard Programme website in October 2020. This shows the Programme moving from set-up and planning to the development stage this year, in preparation for testing and voluntary onboarding next year. The two procurement exercises we are conducting this summer are critical to our timeline. Both remain on course and we are closely monitoring their progress at monthly Board meetings. Programme plans are reviewed each month by the Board. We remain on track to begin onboarding schemes from 2022 with dashboards available from 2023. A transition plan for steady state will start next year with Programme closedown scheduled for March 2025.","fyBaseline":4.66,"fyForecast":4.66,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"","themes":["Delivery & schedule","Commercial & supply chain","Technical & integration","Cost & funding"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber.This is primarily due to the following factors: The Amber rating reflects the balance of progress made to date and the levels of risk being carried. We have successfully delivered the first iteration of data standards, significant progress to commencing two large…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21"},{"id":"DWP_0029_2021-Q4","year":2022,"name":"Pensions Dashboard Programme","department":"DWP","category":"ICT","description":"Pensions dashboards will enable individuals to access their pensions information online, securely and all in one place, thereby supporting better planning for retirement and growing financial wellbeing. Dashboards will provide clear and simple information about an individual's multiple pension savings, including their State Pension. They will also help them to reconnect with any lost pots. The Pensions Dashboards Programme has been established to design and implement the infrastructure that will make dashboards work, and the governance framework to support its operation.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 20/21-Q4, the Delivery Confidence Assessment rating at 21/22-Q4 remained at Amber Since July 2021 significant progress has been made. Procurement of a technology partner was completed in September and the programme completed a three month discovery/setup phase which ended in December. The core technology for dashboards is due to be delivered in May 2022 and this is on track. The Programme has completed the procurement of an identity supplier and they have been successfully integrated with the core technology. Work is being undertaken to develop a set of standards which will provide clarity to all the participants in the service, and ensure it best meets the needs of the consumer. The amber rating reflects the complex delivery environment, in which there are several large organisations participating, including government, regulators and the pensions and financial services industry. A key challenge is the readiness of the pensions industry to join the service when compulsory onboarding is expected to begin in 2023.","startDate":"2019-04-01","endDate":"2025-03-31","scheduleNarrative":"Compared to 2021-Q4, your project end-date remained scheduled to finish on 31 MAR 2025. This is primarily due to the following factors: The programme continues to meet its high-level published milestones which sees testing with invited participants in September 2022. Following this the service will see the steady addition of both pension providers and users. When the service achieves a sufficient level of coverage, it will be made live (known as the dashboards available point). The legislation that compels pension providers to join the service and provide their data will be laid when parliamentary time allows, following publication of the Government's response to its consultation in the summer. The first cohorts of schemes should commence onboarding from April 2023. The service cannot launch before this point. During this time a transition plan will be developed that will set out how the dashboards will become a business as usual operation in 2025 once the programme closes down.","fyBaseline":7.92,"fyForecast":17.09,"fyVariance":116.0,"varianceNarrative":"The budget variance exceeds 5%. The budget variance for FY 21/22 is driven by the outcome from a procurement for technology services which resulted in a reprofile of spend as the costs, although cheaper overall than budgeted, were front-end loaded to enable the programme to deliver more quickly. The budget variance has been met through re-prioritisation of existing budgets.","wholeLifeCost":93.0,"costNarrative":"Compared to 2021-Q4,the projects Baseline Whole Life Cost remained at 93.08 (£m). This is primarily due to the following factors: Whole life costs have remained consistent with the assumptions contained in the programme SOBC, approved in 2020. PDP have now completed two major procurements which broadly fixes costs enabling the programme to remain on budget. This should continue on the basis that the other delivery assumptions remain constant across the programme lifecycle.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Technical & integration","Commercial & supply chain","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Delivery Confidence Assessment rating at 21/22-Q4 remained at Amber Since July 2021 significant progress has been made. Procurement of a technology partner was completed in September and the programme completed a three month discovery/setup phase which ended in December. The core technology for dashboards is due to…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"DWP_0029_2021-Q4","year":2023,"name":"Pensions Dashboard Programme","department":"DWP","category":"ICT","description":"Pensions dashboards will enable individuals to access their pensions information online, securely and all in one place, thereby supporting better planning for retirement and growing financial wellbeing. Dashboards will provide clear and simple information about an individual's multiple pension savings, including their State Pension. They will also help them to reconnect with any lost pots.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 decreased from Amber (SRO rating) to Red (IPA rating). This is primarily due to the following factors. In March 2023 the Department for Work and Pensions (DWP) announced via a Written Ministerial Statement (WMS) that there would be changes to the mandatory connection deadlines for pension providers and schemes. The statement explained that the Pensions Dashboards Programme (PDP) was unable to meet the connection deadlines set out in legislation.PDP is working closely with DWP who have appointed a dedicated Reset Director with experience in large change programmes to oversee the reset, working alongside the existing PDP team. The reset team will:. assess the programme;. revise the plan; and. mobilise for delivery.DWP published a further WMS in June 2023 outlining that regulations have been put before Parliament to replace the previous staging timeline with a single mandatory connection deadline. This will be complemented by guidance which will set out when schemes will be expected to connect. The connection deadline set out in law by DWP will be 31 October 2026.","startDate":null,"endDate":null,"scheduleNarrative":"Early planning GMPP project (The project has not yet passed SOC, or its programme equivalent)","fyBaseline":19.86,"fyForecast":19.2,"fyVariance":-3.0,"varianceNarrative":"N/A as variance is below 5%","wholeLifeCost":null,"costNarrative":"Early planning GMPP project (The project has not yet passed SOC, or its programme equivalent)","benefits":null,"benefitsNarrative":"Early planning GMPP project (The project has not yet passed SOC, or its programme equivalent)","themes":["Scope & requirements","Delivery & schedule","Cost & funding","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 decreased from Amber (SRO rating) to Red (IPA rating). This is primarily due to the following factors. In March 2023 the Department for Work and Pensions (DWP) announced via a Written Ministerial Statement (WMS) that there would be changes to the mandatory connection…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"DWP_0029_2021-Q4","year":2024,"name":"Pensions Dashboard Programme","department":"DWP","category":"ICT","description":"Pensions dashboards will enable individuals to access their pensions information online, securely and all in one place, thereby supporting better planning for retirement and growing financial wellbeing. Dashboards will provide clear and simple information about an individual's multiple pension savings, including their State Pension. They will also help them to reconnect with any lost pots.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. This has since been confirmed by an IPA assessment in mid-April 2024, that reviewed Programme delivery confidence against the recommendations made in the two assurance reviews from early 2023. The Amber rating reflects the progress made over the year in a number of key areas including: - delivering a revised baselined delivery plan - strengthening the senior leadership including the appointment of a full-time SRO - improved ways of working with the supplier - more effective governance arrangements - significant progress made against previous assurance review recommendations - progress made in addressing capability gaps These measures have placed the Programme back on a viable footing and equipped it to meet the new single deadline in legislation of October 2026. There remain a number of risks to delivery that are being actively managed and tracked by the Programme Board.","startDate":null,"endDate":null,"scheduleNarrative":"ARMP adjustments - Project not yet in a position to give cost/schedule","fyBaseline":18.61,"fyForecast":15.88,"fyVariance":-15.0,"varianceNarrative":"The budget variance exceeds 5%. In-year spend total for FY 2023/24 has reduced by 2.7m from baseline of 18.61m to the revised forecast of 15.88m. The variance is largely driven by reprofiled activities from current to future years following reset.","wholeLifeCost":null,"costNarrative":"ARMP adjustments - Project not yet in a position to give cost/schedule","benefits":null,"benefitsNarrative":"ARMP adjustments - Project not yet in a position to give cost/schedule","themes":["Delivery & schedule","Governance & assurance","Cost & funding","Commercial & supply chain"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. This has since been confirmed by an IPA assessment in mid-April 2024, that reviewed Programme delivery confidence against the recommendations made in the two assurance reviews from early 2023. The Amber rating…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"DWP_0029_2021-Q4","year":2025,"name":"PENSIONS DASHBOARD PROGRAMME","department":"DWP","category":"ICT","description":"The Pensions Dashboards Programme (PDP) is being delivered by the Money and Pensions Service (MaPS). Pensions dashboards will enable individuals to access their pensions information online, securely and all in one place, thereby supporting better planning for retirement and growing financial wellbeing. Dashboards will provide clear and simple information about an individual's multiple pension savings, including their State Pension. They will also help them to reconnect with any lost pensions.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The SRO's amber rating aligns with the rating provided by the recent IPA assurance review, and reflects the good progress made with delivery since the programme exited reset last year. A number of key milestones have been delivered including HMT approval of the revised programme business case; the successful connection of our pathfinder organisations to the central digital architecture; continued good progress with the connection of our voluntary participants; and we are on track to commence citizen testing of the end-to-end service in summer 2025. The programme operates within a particularly complex delivery landscape, and there are a number of critical dependencies and risks that are being actively managed and tracked by the Programme Board.","startDate":"2019-04-01","endDate":"2027-03-31","scheduleNarrative":"The project's end-date at 24/25-Q4 is scheduled to be 31/03/2027. This is primarily due to the following factors‚ The programme is on track to deliver to its scheduled end date of March 2027. All pension schemes and providers have now been given dates in guidance by when they should connect to the dashboards ecosystem, and a legal deadline of 30 October 2026 by when they must.","fyBaseline":26.1,"fyForecast":28.1,"fyVariance":7.66,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The in-year spend for FY 2024/25 was £2m higher than the baseline forecast, a variance of 8%. This was driven by the delivery of additional change work identified during programme reset.","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":0.0,"benefitsNarrative":"The project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) is 0. This is primarily due to the following factors‚ Programme benefits will accrue from the point of launch of the service. The launch date has yet to be decided.","themes":["Delivery & schedule","Governance & assurance","Cost & funding","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The SRO's amber rating aligns with the rating provided by the recent IPA assurance review, and reflects the good progress made with delivery since the programme…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"DWP_0029_2021-Q4","year":2026,"name":"PENSIONS DASHBOARD PROGRAMME","department":"DWP","category":"Information and Communications Technology (ICT)","description":"The Pensions Dashboards Programme (PDP) is being delivered by the Money and Pensions Service (MaPS). PDP is an enabling programme, delivering the central digital architecture, standards and governance arrangements necessary for the dashboards ecosystem to operate. The pensions dashboards service will enable individuals to access their pensions information online, securely and all in one place, thereby supporting better planning for retirement and growing financial wellbeing. Dashboards will provide clear and simple information about an individual's multiple pension savings, including their State Pension. They will also help them to reconnect with any lost pensions.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25, the NISTA/SRO Delivery Confidence Assessment rating at 25/26-Q4 remained at AMBER. This is primarily due to the following factors: The Amber rating reflects the delivery confidence assessment and findings of the most recent NISTA review held in March 2026, which noted the excellent progress made to date and found no blockers to delivery. Over the past twelve months we have made significant progress with onboarding pension schemes and providers to the central digital architecture with over 1,000 now connected, which represents over 60 million records or three quarters of those within scope; and are supporting MaPS colleagues with consumer testing for the MoneyHelper Pensions Dashboard, the first dashboard that will be made available, to demonstrate that the end-to-end service meets users' needs. In parallel, we are working with the regulators, DWP and other potential dashboard providers to develop the process and standards necessary to support other dashboards in the future. We are also putting in place transition arrangements, embedding the necessary governance arrangements, practices and procedures to manage Programme closedown and for the central digital architecture to operate as a business as usual activity.","startDate":"2019-04-01","endDate":"2027-03-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same and is scheduled to be 31/03/2027. This is primarily due to the following factors‚ the Programme is on track to deliver its objectives by the scheduled end date of March 2027. Good progress made with the connection of pension schemes and providers to the ecosystem, citizen testing well advanced, and solid progress with the arrangements for transition and Programme closedown.","fyBaseline":34.29,"fyForecast":30.45,"fyVariance":11.19,"varianceNarrative":"The budget variance exceeds 5%. FY 2025/26 in-year spend of £30.63m (real values) as of Q4 reporting was c£4m lower than £34.49m (real values) Departmental Baseline, resulting in variance of 11%. This was driven by the delivery of additional change work identified during programme reset. This increase in costs within the financial year was approved by the Department in October 2025.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Exempt under Section 35 - Formulation of government policy","themes":["Delivery & schedule","Cost & funding","Technical & integration","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25, the NISTA/SRO Delivery Confidence Assessment rating at 25/26-Q4 remained at AMBER. This is primarily due to the following factors: The Amber rating reflects the delivery confidence assessment and findings of the most recent NISTA review held in March 2026, which noted the excellent progress made to date and found no…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"DWP_0029_2021-Q4","year":2025,"name":"PENSIONS DASHBOARD PROGRAMME","department":"DWP","category":"ICT","description":"The Pensions Dashboards Programme (PDP) is being delivered by the Money and Pensions Service (MaPS). Pensions dashboards will enable individuals to access their pensions information online, securely and all in one place, thereby supporting better planning for retirement and growing financial wellbeing. Dashboards will provide clear and simple information about an individual's multiple pension savings, including their State Pension. They will also help them to reconnect with any lost pensions.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The SRO's amber rating aligns with the rating provided by the recent IPA assurance review, and reflects the good progress made with delivery since the programme exited reset last year. A number of key milestones have been delivered including HMT approval of the revised programme business case; the successful connection of our pathfinder organisations to the central digital architecture; continued good progress with the connection of our voluntary participants; and we are on track to commence citizen testing of the end-to-end service in summer 2025. The programme operates within a particularly complex delivery landscape, and there are a number of critical dependencies and risks that are being actively managed and tracked by the Programme Board.","startDate":"2019-04-01","endDate":"2027-03-31","scheduleNarrative":"The project's end-date at 24/25-Q4 is scheduled to be 31/03/2027. This is primarily due to the following factors‚ The programme is on track to deliver to its scheduled end date of March 2027. All pension schemes and providers have now been given dates in guidance by when they should connect to the dashboards ecosystem, and a legal deadline of 30 October 2026 by when they must.","fyBaseline":26.1,"fyForecast":28.1,"fyVariance":7.66,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The in-year spend for FY 2024/25 was £2m higher than the baseline forecast, a variance of 8%. This was driven by the delivery of additional change work identified during programme reset.","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":0.0,"benefitsNarrative":"The project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) is 0. This is primarily due to the following factors‚ Programme benefits will accrue from the point of launch of the service. The launch date has yet to be decided.","themes":["Delivery & schedule","Governance & assurance","Cost & funding","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The SRO's amber rating aligns with the rating provided by the recent IPA assurance review, and reflects the good progress made with delivery since the programme…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":0,"attentionScore":22,"attentionReasons":["Current published delivery confidence is Amber","In-year forecast variance is +11.2%"]},{"id":"DWP_0217_2223-Q4","year":2026,"name":"SERVICE MODERNISATION PROGRAMME","department":"DWP","category":"Government Transformation and Service Delivery","description":"The Service Modernisation Programme (SMP) is transforming services for over 20 million DWP customers, improving how we serve people across society, including children within separated families, people in later life, and individuals with health conditions or disabilities including those looking to progress into work and customers overseas. By transforming how we deliver DWP services, we can significantly improve customer experience and make it easier for frontline colleagues to support those who need us the most. To achieve our transformation aims we have a three-pronged ambition: Digital services with a human touch Embracing new technology, and improving the ways people can contact us Joined-up services, designed around the customer Simplified access, to improve positive customer experience Services that don’t stand still Improved data use helping us to detect and respond to fraud, error, and customer experience barriers","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25-Q4 the programme’s end-date at 25/26-Q4 remained on schedule. This is due to the following factors: Over the past 12 months the Programme has continued to deliver to plan with 8 major milestones delivered, transforming services for our customers and colleagues. A programme of this size, scale and complexity does occasionally result in some variance in key deliverables. Where this has happened, variance has been managed with no tolerance breaches during the financial year. The Programme’s financial benefit position remains healthy. The latest data available demonstrates the Programme is on track to deliver our financial savings forecasts. Our benefits position has been revised upwards. The Programme's non-financial benefits remain healthy with positive feedback from our customers and our colleagues. We continue to embed new ways of working, and changing our culture, which will be further accelerated this coming financial year. We remain mindful of the associated risks and complexities in this area.","startDate":"2022-04-01","endDate":"2033-03-31","scheduleNarrative":"Funding for PBC2 has been approved until end of June 2026. We are currently preparing an updated Business Case and commenced engagement with HMT around obtaining funding until 28/29. Conversations have been very constructive, and we are confident of achieving the levels of funding required for continued Programme delivery. (with the exception of Child Maintenance Service’s Policy Reform implementation, where funding is limited to discovery work whilst required legislative decisions remain outstanding.)","fyBaseline":80.91,"fyForecast":70.23,"fyVariance":13.19,"varianceNarrative":"The budget variance exceeds -13% (-£11m). This is primarily due to the following reason: Slippage in new SR investment opportunities funded in PBC2 Refresh, that started in 2025/6 (£10.6m). The largest drivers within the opportunities are Care/Business Delivery Model equating to £3.23m and the online Customer Account (Get proof of your benefits and state pension) equating to £6.23m, which both had reprofiling of resources during the year.","wholeLifeCost":1150.0,"costNarrative":"SMP’s departmentally agreed Real Terms Costs at 25/26-Q4 (measured in £m) are £1,150m (rounded to nearest £m). This is primarily due to the following factors: A new iteration of the Programme Business Case (PBC2 Refresh) was approved by HMT that considers: - Spending Review opportunities - an increase of £340m. - A prioritisation exercise, focussing on initiatives that deliver the core objectives of Service Modernisation - a reduction of £68m. - Adding back Service Modernisation baseline Business As Usual staff - an increase of £77m - Updating sunk costs - an increase of £1m.","benefits":2111.0,"benefitsNarrative":"SMP's agreed baseline Real Terms financial benefits (measured in £m) are £2,111m (rounded to the nearest £m). This is driven by: 1. Inclusion of Spending Review (SR) Opportunities within the business case following HMT approval. The Spending Review opportunities include increased benefits for the Programme, due in the main to the inclusion of the following: a) Business Delivery Model - including the Customer Account b) Child Maintenance Policy changes c) Inclusion of Bereavement for the Programme. 2. Activity within Children's Services that has brought additional improvements such as Channel Shift, some re-organisation activity and Continuous Improvement activity. 3. Increases in workload volumes and salary cost increases.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25-Q4 the programme’s end-date at 25/26-Q4 remained on schedule. This is due to the following factors: Over the past 12 months the Programme has continued to deliver to plan with 8 major milestones delivered, transforming services for our customers and colleagues. A programme of this size, scale and complexity does occasionally…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"DWP_0217_2223-Q4","year":2024,"name":"Service Modernisation Programme","department":"DWP","category":"Government Transformation and Service Delivery","description":"The Service Modernisation Programme (SMP) is a bold, cross-cutting transformation programme that supports DWP's policy and delivery aims by: . modernising key products making them digital with a human touch . joining up our services based on customer need, and . creating services that don't stand still by investing in our colleagues to unlock a culture of continuous transformation. By modernising in this way we will deliver better, cost effective services that our customers can rely on. Over 20 million customers rely on our services every day, at some of the most difficult and important times. The Programme will transform 11 service areas end to end whilst implementing improvements across DWP to common service areas such as telephony. Using this work we will create a future design for how we deliver services, bringing organisational change and digital transformation to create modern services fit for the future.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. The Infrastructure Project Authority (IPA) Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to: 1) SMP's ambitious programme can only be confirmed as GREEN as it nears the end of its overarching delivery plan. 2) The rating reflects the medium to longer term outlook for the Programme success against its Programme Business Case (PBC) due to its complexities and dependencies on the wider operating environment. 3) SMP is progressing well and there are good indications that the PBC benefits can be delivered. We agree with the IPA commentary on the Programme Delivery Confidence Assessment. The Programme continues to manage the risks arising from the dependencies around the wider operating environment. These risks are managed in line with government risk management methodology. Successful implementation will enable DWP to operate in a streamlined, optimised, more efficient and effective manner, supported by a culture of continuous improvement and incremental change. Legacy IT systems can be decommissioned once replaced with new Digital systems","startDate":"2022-04-01","endDate":"2033-03-31","scheduleNarrative":"The project's end-date at 23/24-Q4 is 2033-03-31. This is primarily due to the following factors. Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained on schedule. This is due to the following factors: Over the past 12 months the Programme has delivered to plan and remains on track to realise the benefits documented in its business case. Where there has been some slight variance in key deliverables, the variance has been actively managed and there have been no tolerance breaches to report during financial year 23/24. Our Programme of cultural change across the organisation continues and whilst progressing well we are mindful of the associated risks and complexities in this area. PBC2 for 24/25 funding is due for HMT approval in May 2024. The Programme will then seek further funding for the next SR period to allow us to continue our modernisation aspirations and delivery of further benefits.","fyBaseline":98.76,"fyForecast":107.4,"fyVariance":9.0,"varianceNarrative":"Since the PBC was signed off SMP have transferred costs that were funded elsewhere within the Department to the programme. This is the cause of the variance between Baseline and Forecast._x000D_ _x000D_ The transferred costs include staff costs previously funded via the department's baseline and Digital staff that are deployed on the programme are now recharged. _x000D_ _x000D_ Budgets were transferred into the programme to match this spend._x000D_ _x000D_ During the financial year an additional 17.3m RDEL in 24/25 relating to additional productivity funding was agreed with HMT, which has been allocated to SMP","wholeLifeCost":449.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 23/24-Q4 is 449m. This is primarily due to the following factors. The budgeted whole life costs remain the same at 448.7m, as what was approved in May 2023 for the Programmes Business Case.","benefits":1026.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 1026m.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Technical & integration"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. The Infrastructure Project Authority (IPA) Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to: 1) SMP's ambitious programme can only be confirmed as GREEN as it nears the end of…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"DWP_0217_2223-Q4","year":2025,"name":"SERVICE MODERNISATION PROGRAMME","department":"DWP","category":"Government Transformation and Service Delivery","description":"The Service Modernisation Programme (SMP) is a bold, cross-cutting transformation programme that supports DWP’s policy and delivery aims by: • Modernising key products making them digital with a human touch • Joining up our services based on customer need, and • Creating services that don’t stand still by investing in our colleagues to unlock a culture of continuous transformation. By modernising in this way we will deliver better, cost effective services that our customers can rely on. Over 20 million customers rely on our services every day, at some of the most difficult and important times. The Programme will transform 11 service areas end to end whilst implementing improvements across DWP to common service areas such as telephony. Using this work we will create a future design for how we deliver services, bringing organisational change and digital transformation to create modern services fit for the future.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The Infrastructure Project Authority (IPA) Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. 1) SMP’s highly ambitious and long-term transformational programme can only be confirmed as GREEN as it nears the end of its overarching delivery cycle. 2) There are 10 recommendations, the majority of these have been addressed, with work progressing well on the remaining actions. IPA Report that successful delivery of the programme/project to time, cost and quality appears feasible but significant issues already exist requiring management attention. These appear resolvable at this stage and, if addressed promptly, should not present a cost/schedule overrun. We accepted the Review Team's recommendations in full and a number of the recommendations have already been delivered we are confident that recommendations will be address for the next IPA assessment The next IPA assessment is due to commence in July.","startDate":"2022-04-01","endDate":null,"scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2033. This is primarily due to the following factors‚ Compared to financial year 23/24-Q4 the project's end-date at 24/25-Q4 remained on schedule. This is due to the following factors: Over the past 12 months the Programme has continued to deliver to plan with 17 major milestones delivered, transforming services for our customers and colleagues. A Programme of this size, scale and complexity does occasionally result in some variance in key deliverables. Where this has happened, variance has been managed with no tolerance breaches to report. The Programme’s financial benefit position remains healthy. The latest data available demonstrates the Programme is on track to deliver our financial savings forecasts. Our benefits position has been revised upwards. The Programme's non-financial benefits remain healthy with positive feedback from our customers and our colleagues. We continue to embed new ways of working, and changing our culture, which will be further accelerated this coming financial year. We remain mindful of the associated risks and complexities in this area. Funding for PBC2 has been approved until end of September 2025, and an updated version of PBC2 will be shared with HMT shortly to secure spending for the remainder of 25/26. We have already commenced engagement with HMT around funding discussions for the next SR period.","fyBaseline":88.36,"fyForecast":95.62,"fyVariance":8.22,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ Since the PBC was signed off SMP have transferred costs that were funded elsewhere within the Department to the programme. This is the cause of the variance between Baseline and Forecast. The transferred costs include staff costs previously funded via the department’s baseline and Digital staff that are deployed on the programme are now recharged. Budgets were transferred into the programme to match this spend. During the financial year an additional £17.3m RDEL in 24/25 relating to additional productivity funding was agreed with HMT, which has been allocated to SMP","wholeLifeCost":763.61,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 449 to 763. This is primarily due to the following factors‚ The budgeted whole life costs remain the same at £763.6m, as what was approved in May 2023 for the Programmes Business Case.","benefits":1184.12,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 1026 to 1184. This is primarily due to the following factors‚ SMP’s agreed baseline financial benefits are £1,184m. At Q4 our forecasted financial benefits have increased from £1,330m to circa £1,432m (c8%). This is driven by the updated workload forecasts from Spring 2023 (used in PBC2) to Winter 2024, leading to greater modernisation savings as fewer members of staff are required. For the full PBC period (22/23 to 32/33), SMP are on track to deliver the financial savings forecasts.","themes":["Cost & funding","Delivery & schedule","Technical & integration","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The Infrastructure Project Authority (IPA) Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. 1) SMP’s highly…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"DWP_0217_2223-Q4","year":2026,"name":"SERVICE MODERNISATION PROGRAMME","department":"DWP","category":"Government Transformation and Service Delivery","description":"The Service Modernisation Programme (SMP) is transforming services for over 20 million DWP customers, improving how we serve people across society, including children within separated families, people in later life, and individuals with health conditions or disabilities including those looking to progress into work and customers overseas. By transforming how we deliver DWP services, we can significantly improve customer experience and make it easier for frontline colleagues to support those who need us the most. To achieve our transformation aims we have a three-pronged ambition: Digital services with a human touch Embracing new technology, and improving the ways people can contact us Joined-up services, designed around the customer Simplified access, to improve positive customer experience Services that don’t stand still Improved data use helping us to detect and respond to fraud, error, and customer experience barriers","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25-Q4 the programme’s end-date at 25/26-Q4 remained on schedule. This is due to the following factors: Over the past 12 months the Programme has continued to deliver to plan with 8 major milestones delivered, transforming services for our customers and colleagues. A programme of this size, scale and complexity does occasionally result in some variance in key deliverables. Where this has happened, variance has been managed with no tolerance breaches during the financial year. The Programme’s financial benefit position remains healthy. The latest data available demonstrates the Programme is on track to deliver our financial savings forecasts. Our benefits position has been revised upwards. The Programme's non-financial benefits remain healthy with positive feedback from our customers and our colleagues. We continue to embed new ways of working, and changing our culture, which will be further accelerated this coming financial year. We remain mindful of the associated risks and complexities in this area.","startDate":"2022-04-01","endDate":"2033-03-31","scheduleNarrative":"Funding for PBC2 has been approved until end of June 2026. We are currently preparing an updated Business Case and commenced engagement with HMT around obtaining funding until 28/29. Conversations have been very constructive, and we are confident of achieving the levels of funding required for continued Programme delivery. (with the exception of Child Maintenance Service’s Policy Reform implementation, where funding is limited to discovery work whilst required legislative decisions remain outstanding.)","fyBaseline":80.91,"fyForecast":70.23,"fyVariance":13.19,"varianceNarrative":"The budget variance exceeds -13% (-£11m). This is primarily due to the following reason: Slippage in new SR investment opportunities funded in PBC2 Refresh, that started in 2025/6 (£10.6m). The largest drivers within the opportunities are Care/Business Delivery Model equating to £3.23m and the online Customer Account (Get proof of your benefits and state pension) equating to £6.23m, which both had reprofiling of resources during the year.","wholeLifeCost":1150.0,"costNarrative":"SMP’s departmentally agreed Real Terms Costs at 25/26-Q4 (measured in £m) are £1,150m (rounded to nearest £m). This is primarily due to the following factors: A new iteration of the Programme Business Case (PBC2 Refresh) was approved by HMT that considers: - Spending Review opportunities - an increase of £340m. - A prioritisation exercise, focussing on initiatives that deliver the core objectives of Service Modernisation - a reduction of £68m. - Adding back Service Modernisation baseline Business As Usual staff - an increase of £77m - Updating sunk costs - an increase of £1m.","benefits":2111.0,"benefitsNarrative":"SMP's agreed baseline Real Terms financial benefits (measured in £m) are £2,111m (rounded to the nearest £m). This is driven by: 1. Inclusion of Spending Review (SR) Opportunities within the business case following HMT approval. The Spending Review opportunities include increased benefits for the Programme, due in the main to the inclusion of the following: a) Business Delivery Model - including the Customer Account b) Child Maintenance Policy changes c) Inclusion of Bereavement for the Programme. 2. Activity within Children's Services that has brought additional improvements such as Channel Shift, some re-organisation activity and Continuous Improvement activity. 3. Increases in workload volumes and salary cost increases.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25-Q4 the programme’s end-date at 25/26-Q4 remained on schedule. This is due to the following factors: Over the past 12 months the Programme has continued to deliver to plan with 8 major milestones delivered, transforming services for our customers and colleagues. A programme of this size, scale and complexity does occasionally…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"DWP_0217_2223-Q4","year":2025,"name":"SERVICE MODERNISATION PROGRAMME","department":"DWP","category":"Government Transformation and Service Delivery","description":"The Service Modernisation Programme (SMP) is a bold, cross-cutting transformation programme that supports DWP’s policy and delivery aims by: • Modernising key products making them digital with a human touch • Joining up our services based on customer need, and • Creating services that don’t stand still by investing in our colleagues to unlock a culture of continuous transformation. By modernising in this way we will deliver better, cost effective services that our customers can rely on. Over 20 million customers rely on our services every day, at some of the most difficult and important times. The Programme will transform 11 service areas end to end whilst implementing improvements across DWP to common service areas such as telephony. Using this work we will create a future design for how we deliver services, bringing organisational change and digital transformation to create modern services fit for the future.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The Infrastructure Project Authority (IPA) Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. 1) SMP’s highly ambitious and long-term transformational programme can only be confirmed as GREEN as it nears the end of its overarching delivery cycle. 2) There are 10 recommendations, the majority of these have been addressed, with work progressing well on the remaining actions. IPA Report that successful delivery of the programme/project to time, cost and quality appears feasible but significant issues already exist requiring management attention. These appear resolvable at this stage and, if addressed promptly, should not present a cost/schedule overrun. We accepted the Review Team's recommendations in full and a number of the recommendations have already been delivered we are confident that recommendations will be address for the next IPA assessment The next IPA assessment is due to commence in July.","startDate":"2022-04-01","endDate":null,"scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2033. This is primarily due to the following factors‚ Compared to financial year 23/24-Q4 the project's end-date at 24/25-Q4 remained on schedule. This is due to the following factors: Over the past 12 months the Programme has continued to deliver to plan with 17 major milestones delivered, transforming services for our customers and colleagues. A Programme of this size, scale and complexity does occasionally result in some variance in key deliverables. Where this has happened, variance has been managed with no tolerance breaches to report. The Programme’s financial benefit position remains healthy. The latest data available demonstrates the Programme is on track to deliver our financial savings forecasts. Our benefits position has been revised upwards. The Programme's non-financial benefits remain healthy with positive feedback from our customers and our colleagues. We continue to embed new ways of working, and changing our culture, which will be further accelerated this coming financial year. We remain mindful of the associated risks and complexities in this area. Funding for PBC2 has been approved until end of September 2025, and an updated version of PBC2 will be shared with HMT shortly to secure spending for the remainder of 25/26. We have already commenced engagement with HMT around funding discussions for the next SR period.","fyBaseline":88.36,"fyForecast":95.62,"fyVariance":8.22,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ Since the PBC was signed off SMP have transferred costs that were funded elsewhere within the Department to the programme. This is the cause of the variance between Baseline and Forecast. The transferred costs include staff costs previously funded via the department’s baseline and Digital staff that are deployed on the programme are now recharged. Budgets were transferred into the programme to match this spend. During the financial year an additional £17.3m RDEL in 24/25 relating to additional productivity funding was agreed with HMT, which has been allocated to SMP","wholeLifeCost":763.61,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 449 to 763. This is primarily due to the following factors‚ The budgeted whole life costs remain the same at £763.6m, as what was approved in May 2023 for the Programmes Business Case.","benefits":1184.12,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 1026 to 1184. This is primarily due to the following factors‚ SMP’s agreed baseline financial benefits are £1,184m. At Q4 our forecasted financial benefits have increased from £1,330m to circa £1,432m (c8%). This is driven by the updated workload forecasts from Spring 2023 (used in PBC2) to Winter 2024, leading to greater modernisation savings as fewer members of staff are required. For the full PBC period (22/23 to 32/33), SMP are on track to deliver the financial savings forecasts.","themes":["Cost & funding","Delivery & schedule","Technical & integration","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The Infrastructure Project Authority (IPA) Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. 1) SMP’s highly…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":null,"attentionScore":22,"attentionReasons":["Current published delivery confidence is Amber","In-year forecast variance is +13.2%"]},{"id":"DWP_0042_2122-Q3","year":2026,"name":"SYNERGY PROGRAMME","department":"DWP","category":"Government Transformation and Service Delivery","description":"Synergy Programme is a collaboration between the Department for Environment, Food & Rural Affairs (DEFRA), Department for Work and Pensions (DWP), Home Office (HO) and Ministry of Justice (MOJ) to achieve the Government’s Shared Services Strategy by transforming shared services to make them smarter, swifter and more streamlined. Synergy is a business transformation programme to replace the current services provided by Shared Services Connected Limited (SSCL) to those four departments and their. Arms Length Bodies (ALBS). It focusses on simplifying and aligning processes, data systems, and services, to transform our users’ experiences and drive interoperability between departments, resulting in increased productivity and value for money. Synergy will transform the business-critical services (people, finance, commercial) for the four departments. It will be delivered through shared capabilities and technology as a platform for innovation, automation, and improved customer experience. The four departments support more than 250 000 civil and public servants who deliver some of the most vital and high-risk public services in our country. Synergy will make it easier for our people to do their job and deliver efficiencies that free up resources to focus on public outcomes.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 increased to AMBER. This is primarily due to the following factors: - Delivery of structured Roadmap to Amber addressing NISTA recommendations - Demonstrable progress against NISTA critical findings (planning, governance, readiness) - Strengthened operating model, roles and cross-department working - Improved dependency, contract, and integrated delivery management - Increased planning maturity and clarity of delivery approach - Sustained improvement trajectory confirmed through Stage Gate 3 assurance","startDate":"2021-04-01","endDate":"2029-01-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 increased from December 2028 to January 2029. The shift from December 2028 to January reflects the re-baselined delivery plan which extended the common design phase and adjusted the release strategy and sequencing. This resulted in a small, controlled extension to accommodate a more robust and deliverable implementation profile.","fyBaseline":152.95,"fyForecast":144.99,"fyVariance":5.21,"varianceNarrative":"The core programme outturn was within 5% of the ringfenced budget the overall variance exceeds 5% due to additional spend in partner departments being below the previous estimate following movement of costs into future years.","wholeLifeCost":1990.99,"costNarrative":"The projects departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) was £1990.99m. This is primarily due to updated numbers and reassessment undertaken in the move to full business case 2 from full business case 1.","benefits":734.07,"benefitsNarrative":"The benefits are £734.07m over the 10 year business case period. Benefits were re-baselined in 25/26 for FBC2 and the landscape of the programme hasn't changed enough since 25/26 to re-baseline as the BPS provider is still onboarding. Work is ongoing to identify further benefits, particularly with the BPS and the Hub.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 increased to AMBER. This is primarily due to the following factors: - Delivery of structured Roadmap to Amber addressing NISTA recommendations - Demonstrable progress against NISTA critical findings (planning, governance, readiness) - Strengthened…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"DWP_0042_2122-Q3","year":2023,"name":"Synergy Programme","department":"DWP","category":"Government Transformation and Service Delivery","description":"The Department for Environment, Food and Rural Affairs (DEFRA), Department for Work and Pensions, Home Office (HO) and Ministry of Justice (MOJ) are collaborating together in a cluster to achieve the Government's Shared Services Strategy by transforming shared services to make them smarter, swifter and more streamlined. Synergy is a business transformation programme to replace the current services provided by Shared Services Connected Limited (SSCL) and focusing simplifying and aligning processes, data systems and services, to transform our users' experiences and drive interoperability between departments, resulting in increased productivity and value for money, provided through a single Software as a Service (SaaS) Enterprise Resource Planning (ERP) platform and business process service. The four departments have committed to working as a single cluster with departments responsible for their departmental transformations.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 is Amber. This is primarily due to the following factors. The Synergy programme agrees with the IPA commentary on the Programme Delivery Confidence Assessment. The programme continues to manage the significant risks arising from the complexity and scale of change required. Risk management remains embedded across the programme, managed by dedicated programme risk resources and reviewed at the monthly Programme Board. Successful implementation will enable and utilise the full potential of cloud technology to drive further efficiencies, savings and better user experience. The magnitude of change required in each Department cannot be underestimated and will require strengthened programme transformation leadership and capability (which we are actively shaping) and cross Government support at all levels in order to deliver step changes in effectiveness of shared services across those Departments.","startDate":"2021-04-01","endDate":"2028-12-29","scheduleNarrative":"The project's end-date at 22/23-Q4 is 2028-12-29. This is primarily due to the following factors. The Programme has completed a planning refresh and was baselined by the Synergy Strategic Programme Board at the end of April. This planning refresh has brought a greater understanding and added more detail of the activities needed to design and procure technology, delivery partners and also change ways of working that will meet our user experience and benefits ambition and enable this to be presented in a compelling Full Business Case. Delivery dates have been updated accordingly.","fyBaseline":20.0,"fyForecast":15.15,"fyVariance":-24.0,"varianceNarrative":"In Financial year 22/23 Synergy expenditure (15m), was below the 20m drawdown. This is largely due to timing of expenditure on staffing and consultancy in departments. In March 2023, HMT agreed flexibility to allow the carry forward of the anticipated underspend in 23/24 (It is proposed to share an initial view of this with HMT) to support the Full Business Case approval into Q1 of financial year 24/25, through a date only extension. The Programme is strengthening its financial management, linking closely with department teams to develop a resourced integrated plan. This will underpin managing expenditure in 2023/24.","wholeLifeCost":2488.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 22/23-Q4 is 2488m. This is primarily due to the following factors. The programme has agreed funding for the current Spending Review period to 2024. However this is a cross department programme which extends beyond the current Spending Review period. Projected funding for the next Spending Review period will need to be agreed with HMT so that the programme can deliver its scope and benefits.","benefits":1089.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 1089m. Benefits are being matured, through asking Department functional directors to identify connected and end to end strategic opportunities, alongside maturing the already identified benefits as the design develops. We are ensuring our work helps shape and align to the cross-Government benefits work.","themes":["Cost & funding","Approvals & decisions","Governance & assurance","Delivery & schedule"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 is Amber. This is primarily due to the following factors. The Synergy programme agrees with the IPA commentary on the Programme Delivery Confidence Assessment. The programme continues to manage the significant risks arising from the complexity and scale of change…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"DWP_0042_2122-Q3","year":2024,"name":"Synergy Programme","department":"DWP","category":"Government Transformation and Service Delivery","description":"The Department for Environment, Food and Rural Affairs (DEFRA), Department for Work and Pensions, Home Office (HO) and Ministry of Justice (MOJ) are collaborating together in a cluster to achieve the Government's Shared Services Strategy by transforming shared services to make them smarter, swifter and more streamlined. Synergy is a business transformation programme to replace the current services provided by Shared Services Connected Limited (SSCL) and focusing simplifying and aligning processes, data systems and services, to transform our users' experiences and drive interoperability between departments, resulting in increased productivity and value for money, provided through a single Software as a Service (SaaS) Enterprise Resource Planning (ERP) platform and business process service. The four departments have committed to working as a single cluster with departments responsible for their departmental transformations.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. The Delivery confidence for Syngery remains Amber, reflecting the significant challenge involved in delivering a business transformation change programme to circa 220,000 civil servants across the Department for Work and Pensions, the Ministry of Justice, the Home Office and the Department for Food, Environment and Rural Affairs. IPA Gate 3 review is due in June 2024 and the Programme will respond to any recommendations arising from that and are currently responding to recommendations from GIAA to strenghten the Programme governance which will be key as we move into the delivery stage of the Programme.","startDate":"2021-04-01","endDate":"2028-12-29","scheduleNarrative":"The project's end-date at 23/24-Q4 is 2028-12-29. This is primarily due to the following factors. The Synergy Programme Full Business Case is on track for HMT approval by July 2024 with SI/ERP procurement on track for contract award once FBC approval is in place. BPS ITT is now been prepared ready for publication.","fyBaseline":55.0,"fyForecast":39.8,"fyVariance":-28.0,"varianceNarrative":"In Financial year 23/24 Synergy expenditure (39.8m), was below the 65m drawdown. This is largely due to timing of expenditure on staffing and consultancy in departments. HMT agreed flexibility to allow the carry forward of 17.6m of the anticipated underspend in 23/24 to support the Full Business Case approval into Q1 of financial year 24/25, through a date only extension._x000D_ The Programme is strengthening its financial management through a resource integrated plan and greater understanding of the cost elements making up the full business case. This will underpin managing expenditure in 2024/25.","wholeLifeCost":2488.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 remained at 2488m. This is primarily due to the following factors. The programme extends beyond the SR period (2024) that it is funded for. Further funding for the next SR period will need to be agreed with HMT for this cross department transformation programme","benefits":1089.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 1089m.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Commercial & supply chain"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. The Delivery confidence for Syngery remains Amber, reflecting the significant challenge involved in delivering a business transformation change programme to circa 220,000 civil servants across the Department for…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"DWP_0042_2122-Q3","year":2025,"name":"SYNERGY PROGRAMME","department":"DWP","category":"Government Transformation and Service Delivery","description":"The Department for Environment, Food & Rural Affairs (DEFRA), Department for Work and Pensions (DWP), Home Office (HO) and Ministry of Justice (MOJ) are collaborating together in a cluster to achieve the Government’s Shared Services Strategy by transforming shared services to make them smarter, swifter and more streamlined. Synergy is a business transformation programme to replace the current services provided by Shared Services Connected Limited (SSCL). It focusses on simplifying and aligning processes, data systems and services, to transform our users’ experiences and drive interoperability between departments, resulting in increased productivity and value for money, provided through a single Software as a Service (SaaS) Enterprise Resource Planning (ERP) platform and business process service. The four departments have committed to working as a single cluster with departments responsible for their departmental transformations. Every year the Government spends around £525m on shared services. This provides business critical services like HR, finance, payroll and procurement for around 500,000 civil servants, 230,000 military personnel and reservists, and one million veterans. It makes around 15 million financial transactions at a value of £278bn. So far 286 siloed departmental based systems have been discovered and the majority are approaching end of life, are increasingly expensive to maintain and cyber vulnerable. They need to be replaced. In 2021, it was estimated a direct cost of £1.7- £2 billion (2020 prices) to replace shared service systems individually by department, delivering approximately 10% annual savings. The Government strategy is estimated to realise double those annual cashable savings as well as over £2bn of additional efficiencies and productivity benefits by bringing departments together to form clusters to transform shared services. Synergy is one of the clusters formed as part of this initiative. We are a cross-departmental programme developing and implementing this shared services transformation across: DWP, Defra, Home Office, and MoJ. These departments support more than a quarter of a million officials and public servants who deliver some of the most vital and high-risk public services in our country. Working as a ‘cluster’ gets the best results, allows for better data sharing, better decision-making, and simpler processes. Joint decisions allow us to put users and the collective benefit first. Synergy will transform the business-critical services (people, finance, commercial) for the four departments. It will be delivered through shared capabilities and technology as a platform for innovation, automation and improved customer experience. It will make it easier for our people to do their job and deliver efficiencies that free up resources to focus on public outcomes. ​","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 decreased from AMBER to RED. This is primarily due to the following factors‚ This was due to feedback from stakeholders raising concerns with the previous SRO about losing confidence in the Programme's leadership, unclear roles and responsibilities and ways of working in the Programme and the lack of a coherent integrated Programme plan. On the Q2 GMPP report for 2024/25 the then SRO assessed the Programme as Red. Subsequently 2 further Infrastructure and Projects Authority (IPA) reviews have taken place, the first was an assurance review as a response to the red assessment (December 24) followed by a Gate 0 review to assure progress was being made and that the Programme was on track. Although the review delivery confidence remained as Red, the report acknowledge the significant work that has taken place and that the Programme is on the right trajectory. It stated that all the recommendations from December had been addressed but there had not been enough time for the changes to have worked through into live running. An Assurance of Action Plan review is being planned for late July early August 2025.","startDate":"2021-04-01","endDate":"2028-12-29","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 29/12/2028. This is primarily due to the following factors‚ As of 31 March 2025 the Programme was still working to an end of Programme date of 29 December 2028. However we currently working through a change request which will move the Programme’s end date into early 2029 and once approved though governance it will be reported to GMPP accordingly.","fyBaseline":104.49,"fyForecast":83.11,"fyVariance":20.46,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ Delivery plans and final costs have been refined from the estimates made at Outline Business Case leading to an underspend in 2024/25","wholeLifeCost":2450.59,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 2488 to 2450. This is primarily due to the following factors‚ The total forecast for this programme between FY2021/22 and FY2036/37 is £2337.23m vs £2450.59m baseline which represents the financial case of the full business case in nominal terms. To arrive at these figures, we assessed the financial costs over both a 10- and 15-year period and compared the total and incremental costs of options against a funding baseline position. The baseline, shown in the the full business case is assumed to include all recurrent costs incurred by the departments for existing ERP technology and the BPS provider. The move to full business case from outline business case has reduced the baseline from £2487.74m to £2450.59m","benefits":776.12,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) decreased from 1089 to 776. This is primarily due to the following factors, Baseline numbers were refreshed to reflect movement in the functional HR/Finance/Commercial teams impacted by the Programme. Optimism Bias was reviewed and in some cases increased, to reflect the lack of design maturity and confidence against the process benefits. The position is being recovered and improved for 25/26 and FBC2 with current modelling demonstrating a c£44m p.a. improvement.","themes":["Cost & funding","Governance & assurance","Approvals & decisions","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 decreased from AMBER to RED. This is primarily due to the following factors‚ This was due to feedback from stakeholders raising concerns with the previous SRO about losing confidence in the Programme's leadership, unclear roles and…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"DWP_0042_2122-Q3","year":2026,"name":"SYNERGY PROGRAMME","department":"DWP","category":"Government Transformation and Service Delivery","description":"Synergy Programme is a collaboration between the Department for Environment, Food & Rural Affairs (DEFRA), Department for Work and Pensions (DWP), Home Office (HO) and Ministry of Justice (MOJ) to achieve the Government’s Shared Services Strategy by transforming shared services to make them smarter, swifter and more streamlined. Synergy is a business transformation programme to replace the current services provided by Shared Services Connected Limited (SSCL) to those four departments and their. Arms Length Bodies (ALBS). It focusses on simplifying and aligning processes, data systems, and services, to transform our users’ experiences and drive interoperability between departments, resulting in increased productivity and value for money. Synergy will transform the business-critical services (people, finance, commercial) for the four departments. It will be delivered through shared capabilities and technology as a platform for innovation, automation, and improved customer experience. The four departments support more than 250 000 civil and public servants who deliver some of the most vital and high-risk public services in our country. Synergy will make it easier for our people to do their job and deliver efficiencies that free up resources to focus on public outcomes.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 increased to AMBER. This is primarily due to the following factors: - Delivery of structured Roadmap to Amber addressing NISTA recommendations - Demonstrable progress against NISTA critical findings (planning, governance, readiness) - Strengthened operating model, roles and cross-department working - Improved dependency, contract, and integrated delivery management - Increased planning maturity and clarity of delivery approach - Sustained improvement trajectory confirmed through Stage Gate 3 assurance","startDate":"2021-04-01","endDate":"2029-01-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 increased from December 2028 to January 2029. The shift from December 2028 to January reflects the re-baselined delivery plan which extended the common design phase and adjusted the release strategy and sequencing. This resulted in a small, controlled extension to accommodate a more robust and deliverable implementation profile.","fyBaseline":152.95,"fyForecast":144.99,"fyVariance":5.21,"varianceNarrative":"The core programme outturn was within 5% of the ringfenced budget the overall variance exceeds 5% due to additional spend in partner departments being below the previous estimate following movement of costs into future years.","wholeLifeCost":1990.99,"costNarrative":"The projects departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) was £1990.99m. This is primarily due to updated numbers and reassessment undertaken in the move to full business case 2 from full business case 1.","benefits":734.07,"benefitsNarrative":"The benefits are £734.07m over the 10 year business case period. Benefits were re-baselined in 25/26 for FBC2 and the landscape of the programme hasn't changed enough since 25/26 to re-baseline as the BPS provider is still onboarding. Work is ongoing to identify further benefits, particularly with the BPS and the Hub.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 increased to AMBER. This is primarily due to the following factors: - Delivery of structured Roadmap to Amber addressing NISTA recommendations - Demonstrable progress against NISTA critical findings (planning, governance, readiness) - Strengthened…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"DWP_0042_2122-Q3","year":2025,"name":"SYNERGY PROGRAMME","department":"DWP","category":"Government Transformation and Service Delivery","description":"The Department for Environment, Food & Rural Affairs (DEFRA), Department for Work and Pensions (DWP), Home Office (HO) and Ministry of Justice (MOJ) are collaborating together in a cluster to achieve the Government’s Shared Services Strategy by transforming shared services to make them smarter, swifter and more streamlined. Synergy is a business transformation programme to replace the current services provided by Shared Services Connected Limited (SSCL). It focusses on simplifying and aligning processes, data systems and services, to transform our users’ experiences and drive interoperability between departments, resulting in increased productivity and value for money, provided through a single Software as a Service (SaaS) Enterprise Resource Planning (ERP) platform and business process service. The four departments have committed to working as a single cluster with departments responsible for their departmental transformations. Every year the Government spends around £525m on shared services. This provides business critical services like HR, finance, payroll and procurement for around 500,000 civil servants, 230,000 military personnel and reservists, and one million veterans. It makes around 15 million financial transactions at a value of £278bn. So far 286 siloed departmental based systems have been discovered and the majority are approaching end of life, are increasingly expensive to maintain and cyber vulnerable. They need to be replaced. In 2021, it was estimated a direct cost of £1.7- £2 billion (2020 prices) to replace shared service systems individually by department, delivering approximately 10% annual savings. The Government strategy is estimated to realise double those annual cashable savings as well as over £2bn of additional efficiencies and productivity benefits by bringing departments together to form clusters to transform shared services. Synergy is one of the clusters formed as part of this initiative. We are a cross-departmental programme developing and implementing this shared services transformation across: DWP, Defra, Home Office, and MoJ. These departments support more than a quarter of a million officials and public servants who deliver some of the most vital and high-risk public services in our country. Working as a ‘cluster’ gets the best results, allows for better data sharing, better decision-making, and simpler processes. Joint decisions allow us to put users and the collective benefit first. Synergy will transform the business-critical services (people, finance, commercial) for the four departments. It will be delivered through shared capabilities and technology as a platform for innovation, automation and improved customer experience. It will make it easier for our people to do their job and deliver efficiencies that free up resources to focus on public outcomes. ​","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 decreased from AMBER to RED. This is primarily due to the following factors‚ This was due to feedback from stakeholders raising concerns with the previous SRO about losing confidence in the Programme's leadership, unclear roles and responsibilities and ways of working in the Programme and the lack of a coherent integrated Programme plan. On the Q2 GMPP report for 2024/25 the then SRO assessed the Programme as Red. Subsequently 2 further Infrastructure and Projects Authority (IPA) reviews have taken place, the first was an assurance review as a response to the red assessment (December 24) followed by a Gate 0 review to assure progress was being made and that the Programme was on track. Although the review delivery confidence remained as Red, the report acknowledge the significant work that has taken place and that the Programme is on the right trajectory. It stated that all the recommendations from December had been addressed but there had not been enough time for the changes to have worked through into live running. An Assurance of Action Plan review is being planned for late July early August 2025.","startDate":"2021-04-01","endDate":"2028-12-29","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 29/12/2028. This is primarily due to the following factors‚ As of 31 March 2025 the Programme was still working to an end of Programme date of 29 December 2028. However we currently working through a change request which will move the Programme’s end date into early 2029 and once approved though governance it will be reported to GMPP accordingly.","fyBaseline":104.49,"fyForecast":83.11,"fyVariance":20.46,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ Delivery plans and final costs have been refined from the estimates made at Outline Business Case leading to an underspend in 2024/25","wholeLifeCost":2450.59,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 2488 to 2450. This is primarily due to the following factors‚ The total forecast for this programme between FY2021/22 and FY2036/37 is £2337.23m vs £2450.59m baseline which represents the financial case of the full business case in nominal terms. To arrive at these figures, we assessed the financial costs over both a 10- and 15-year period and compared the total and incremental costs of options against a funding baseline position. The baseline, shown in the the full business case is assumed to include all recurrent costs incurred by the departments for existing ERP technology and the BPS provider. The move to full business case from outline business case has reduced the baseline from £2487.74m to £2450.59m","benefits":776.12,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) decreased from 1089 to 776. This is primarily due to the following factors, Baseline numbers were refreshed to reflect movement in the functional HR/Finance/Commercial teams impacted by the Programme. Optimism Bias was reviewed and in some cases increased, to reflect the lack of design maturity and confidence against the process benefits. The position is being recovered and improved for 25/26 and FBC2 with current modelling demonstrating a c£44m p.a. improvement.","themes":["Cost & funding","Governance & assurance","Approvals & decisions","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 decreased from AMBER to RED. This is primarily due to the following factors‚ This was due to feedback from stakeholders raising concerns with the previous SRO about losing confidence in the Programme's leadership, unclear roles and…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":-1,"transition":"Improved","endDateDeltaDays":33,"attentionScore":22,"attentionReasons":["Current published delivery confidence is Amber","Published end date moved 33 days later","In-year forecast variance is +5.2%"]},{"id":"DFE_0010_1819-Q1","year":2026,"name":"T-Levels","department":"DFE","category":"Government Transformation and Service Delivery","description":"T Levels are two-year technical qualifications for 16-19-year-olds, offering students practical and knowledge based learning at a school or college and on-the-job experience through an industry placement of at least 315 hours - approximately 45 days. T Levels are designed to increase the economic value of skills being supplied by the post-16 system, increasing take-up of high-quality qualifications to improve skills, key to supporting the government's opportunity and growth missions. The T Level programme aims to roll-out and support the growth of T Levels to achieve these missions and benefits.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Overall delivery confidence for 2025/26 is Amber. The programme continues to perform strongly on quality, with positive trends in participation, retention, attainment and industry placements, and independent assurance confirms clear benefits for learners and employers. Confidence has improved over the year through stable recruitment in line with forecasts, high completion of industry placements and continued ministerial support, including targeted funding to sustain delivery. The Amber rating reflects ongoing and largely structural challenges in scaling the programme to its agreed steady‑state ambition rather than a decline in performance. Key pressures include the pace required to grow participation, uneven provider and employer capacity to expand placements, and the planned introduction of a new V Level route, all of which could constrain growth despite strong outcomes. Our pathway to Green includes: steps taken to ensure T Levels are accessible by a wider range of students through updates to our delivery framework to improve the quality and availability of industry placements; making improvements to T Levels by streamlining content and reducing assessment to improve deliverability; and setting out the purpose and intent for T Levels alongside V Levels in the response to the Post-16 Level 3 and Below Pathways consultation. This will support the programme in maintaining incremental growth following the initial period of intense scale-up and ensuring T Levels remain an attractive option for students and providers.","startDate":"2016-10-25","endDate":"2028-09-01","scheduleNarrative":"The programme’s planned end date remains 01/09/2028. The programme remains on track to have delivered at least two cohorts on each of the T Levels introduced in scope of this programme by this date. All large (1080+) legacy qualifications in existing T Level areas (with the exception of Health and Social Care) will be defunded in 2027. At that point, T Levels will be the only large (1080+) qualification available for those subjects. Steady State, the point at which we expect student numbers to peak and level, changing only in response to demographic shifts, is expected to be academic year 29/30.","fyBaseline":196.89,"fyForecast":175.31,"fyVariance":10.96,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors: reclaim of the T Level capital funding Specialist Equipment Allocation (SEA), lower than anticipated final costs of the Employer Support Funds (ESF) for Health and Small or Medium Enterprises (SMEs) and Construction, and the closure of IfATE and transfer of some core functions to Skills England and then DfE resulting in some prior costs no longer being in scope of the T Level programme.","wholeLifeCost":2025.0,"costNarrative":"Compared to financial year 24/25-Q4, the programme’s departmentally agreed Whole Life Cost (measured in £m) increase from £1,653m to £1,856m. This reflects the 25/26 budget being agreed and added to the WLC.","benefits":null,"benefitsNarrative":"The T Levels Programme does not yet report on its monetised benefit as longitudinal earnings data has not yet become available. From next year the programme will be able to report on this.","themes":["Cost & funding","Delivery & schedule","Scope & requirements","Workforce & capability"],"evidenceExcerpt":"Overall delivery confidence for 2025/26 is Amber. The programme continues to perform strongly on quality, with positive trends in participation, retention, attainment and industry placements, and independent assurance confirms clear benefits for learners and employers. Confidence has improved over the year through stable recruitment in line with forecasts,…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"DFE_0010_1819-Q1","year":2020,"name":"T Level Programme","department":"DfE","category":"Government Transformation and Service Delivery","description":"To manage the development and delivery of new T Level qualifications, closure and benefit realisation","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber/Red, which has not changed since last year�s Q2 1819 Amber/Red, due primarily to the following factors; - An assurance review by IPA in December 2019 also had an Amber/Red DCA. In this review, a major risk was identified to September 2020 roll-out that the Technical Qualification (TQ) would not be developed, agreed and available for first teaching in September. However, this has since been agreed and signed off in April 2020. - The long-term sustainability of the T Levels programme has major challenges, the most immediate of which is its position in the upcoming Spending Review. The T Levels unique value in the wider qualifications landscape needs to be clearly set out to address this. - The strategic landscape for T Levels is not considered to be stable. If T Levels are to be part of the journey from Level 2 to Level 4 and employment, there needs to be consistency of approach across the reform landscape. Since the Q2 1920 (30th September 2019) Amber/Red IPA DCA, the following non-project operating environment activities have impacted the original Q2 IPA DCA; - The Covid-19 outbreak has re-directed priorities and in some cases, staff, to urgent Covid-19 related work. However, we do not anticipate that this will impact the ability to deliver in September 2020 as staff continue to work at pace, re-prioritise work where necessary and seek appropriate steers from Ministers. - Cabinet Office/No 10 have restricted government comms during the Coronavirus outbreak, which has resulted in comms on T Levels being paused. This will impact our planned comms and engagement strategy, which is currently under review. Since the Q2 1920 (30th September 2019) Amber/Red IPA DCA, the following primary project actions have impacted the original Q2 IPA DCA; - The delay to the approval of the Technical Qualifications originally posed a distinct threat to the September 2020 launch. These have since been approved by IfATE and Ofqual and are ahead of first teaching in September, eliminating what was one of the most significant risks to delivery. - An assurance review by IPA in December 2019 stated that \"In short, the amber red confidence rating reflects the complexity and size of the challenges described above to the long term delivery. If the Review Team was assessing the confidence in the delivery of the September 2020 milestone, we would assess confidence as Amber. This reflects the good work the programme has undertaken in its contingency planning, stakeholder engagement and close working with the AOs � as well as significant progress shown with employer and providers.\"","startDate":"2016-10-25","endDate":"2023-09-30","scheduleNarrative":"The scheduled baseline project end date at Q2 1920 (30th September 2019) is 30/09/23, has not changed since last year's Q2 1819 date of 30/09/23, due primarily to the following factors; - We remain committed to the delivery of T Levels from September 2020 though the current Covid-19 circumstances bring additional challenges, particularly for providers and for employers who might offer industry placements. We will continue to provide all the support we can to our partners throughout this period. - We have spoken to a majority of the 50 2020 providers regarding T Level in September and will continue to monitor. Providers are positive overall, but it�s important to note that the full impact of the Covid 19 has yet to have full effect and this picture may shift in the coming weeks. - The delay to the approval of the Technical Qualifications originally posed a distinct threat to the September 2020 launch. These have since been approved by IfATE and Ofqual and are ahead of first teaching in September, eliminating what was one of the most significant risks to delivery","fyBaseline":105.6,"fyForecast":123.6,"fyVariance":17.0,"varianceNarrative":"The 19/20 in-year baseline / forecast variance at Q2 1920 (30th September 2019) of 17%, is due primarily to the following factors; - In September 2019, an updated Strategic Overarching Business Case (SOBC) was drafted and submitted to the DFE Investment Committee. During this process we worked with all the different teams delivering the T Level elements and conducted a full review of the budgets required. During this process it was identified the budgets in the original SOBC and GMPP report had changed as the scope and delivery on the work had been agreed. The budgets were updated to reflect the latest figures. Since the Q2 1920 (30th September 2019) 19/20 in-year baseline / forecast variance of 17%, the following non-project operating environment activities have impacted the original Q2 19/20 in-year baseline / forecast variance; - The Cabinet Office advised our communication campaign colleagues to turn off the social media advertising in March 20, due to COVID-19. This led to an underspend in Financial Year 19-20. Since the Q2 1920 (30th September 2019) 19/20 in-year baseline / forecast variance of 17%, the following primary project actions have impacted the original Q2 19/20 in-year variance; - The delay in agreeing the first TQ has meant some of the networking events were delayed into financial year 20-21. This has caused an underspend in Financial Year 19-20.","wholeLifeCost":155.6,"costNarrative":"The baseline Whole Life Cost at Q2 1920 (30th September 2019) is �155.60 m, has increased by �9.40 m since last year's Q2 1819 (�m) baseline Whole Life Cost of �146.20 m, due primarily to the following factors; - In September 2019, an updated Strategic Overarching Business Case (SOBC) was drafted and submitted to the DFE Investment Committee. During this process we worked with all the different teams delivering the T Level elements and conducted a full review of the budgets required. During this process it was identified the budgets in the original SOBC and GMPP report had changed as the scope and delivery on the work had been agreed. The budgets were updated to reflect the latest figures. - In 20-21, the Strategic Business Case will be drafted and submitted to the Investment Committee (depending on COVID-19 work). The budgets will be reviewed, budgets may change further as additional work is scoped and delivered. Since the Q2 1920 (30th September 2019) �155.60 m baseline Whole Life Cost, the following non-project operating environment activities have impacted the original baseline Q2 Whole Life Cost; - The Cabinet Office advised our communication campaign colleagues to turn off the social media advertising in March 20, due to COVID-19. This led to an underspend in Financial Year 19-20. This will continue into Financial Year 20-21. The way networking and awareness raising with providers will have to be reviewed as we can not hold face to face events as planned, this will cause underspends will emerge. - Due to COVID-19 we may not be able to engage the employers needed to deliver the industry placements and therefore will not be able to deliver the expected amount of T Levels in September 2020, leading to an underspend. Since the Q2 1920 (30th September 2019) �155.60 m baseline Whole Life Cost, the following primary project actions have impacted the original Q2 baseline Whole Life Cost; - Through the SOBC, all the elements of T Levels have been reviewed and fully scoped. This has increased the WLC but we have a more robust T Level programme and delivery options to ensure the work is delivered effectively.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Approvals & decisions"],"evidenceExcerpt":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber/Red, which has not changed since last year�s Q2 1819 Amber/Red, due primarily to the following factors; - An assurance review by IPA in December 2019 also had an Amber/Red DCA. In this review, a major risk was identified to September 2020 roll-out that the…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2020","sourceLabel":"IPA Annual Report 2019-20"},{"id":"DFE_0010_1819-Q1","year":2021,"name":"T Level Programme","department":"DFE","category":"Government Transformation and Service Delivery","description":"To increase the economic value of skills being supplied by the post 16 system, increasing take-up of high quality qualifications to improve skills, increasing productivity and social mobility. To enable the sustainable delivery of new high quality T Levels for 16-19 year olds.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber/red. This is primarily due to the following factors: The IPA made seven recommendations to improve the project and programme management of the T Level delivery for larger successive waves. We have made significant progress in addressing all the recommendations and meet on a monthly basis with the IPA to keep them informed of the progress we are making. The Technical Education Reform Board are sighted at bi-monthly intervals, on the progress we are making. The Major Projects Team at DfE have also provided us with additional support to ensure we remain on track to deliver T Levels in future waves. We will be carrying out our own internal review of the progress made against the assurance of action plan in June 2021.","startDate":"2016-10-25","endDate":"2023-09-30","scheduleNarrative":"Compared to financial year 19/20-Q2, the project's end-date remained scheduled to finish on 30 September 2023 . This is primarily due to the following factors: The current schedule has no known deviations from the planned schedule. Lessons learned from Wave 1 roll out are in progress to support planning for future waves. Covid-19 introduced new levels of uncertainty and the team are monitoring the potential impact on launch in September 2021.","fyBaseline":259.61,"fyForecast":143.84,"fyVariance":-45.0,"varianceNarrative":"The budget variance exceeds 5%. We are forecasting an underspend against the 20-21 budget. This underspend has emerged primarily due to the impact of Covid on the programme throughout the year.","wholeLifeCost":1101.26,"costNarrative":"Compared to financial year 19/20-Q2, the projects Baseline Whole Life Cost increased from �155.60m to �1101.26m. This is primarily due to the following factors: Our current projected Whole Life Costs has been refined in the course additional planning through spending review. Covid has had a considerable impact in FY 20-21","benefits":null,"benefitsNarrative":"","themes":["Delivery & schedule","Cost & funding","Governance & assurance","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber/red. This is primarily due to the following factors: The IPA made seven recommendations to improve the project and programme management of the T Level delivery for larger successive waves. We have made significant progress in…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21"},{"id":"DFE_0010_1819-Q1","year":2022,"name":"T Level Programme","department":"DFE","category":"Government Transformation and Service Delivery","description":"The current IPA Delivery Confidence Assessment for T Level programme is AMBER, following the review in September 2021. The Government Internal Audit Authority followed with a deep dive audit of Industry Placements and Capital Funding its findings rated the programme as MODERATE. The actions underway to address the recommendations are to further develop the T Level employer engagement strategy to support the scaling of provision of Industry Placements. The team is also working closely with the Association of Colleges to provide the right level of support for providers and stakeholders in Waves 3 and 4. The T Level team has developed a benefits realisation strategy and continues planning and preparation to support the success of future Waves. For the 2021/22 Academic Year, we have 10 T Levels being offered across 102 providers of all types, we are monitoring delivery, including Wave 2 providers' ability to source the necessary industry placements.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 decreased from Amber/red to Amber","startDate":"2016-10-25","endDate":"2023-09-30","scheduleNarrative":"Compared to 2021-Q4, your project end-date remained scheduled to finish on 30 SEP 2023 . This is primarily due to the following factors: The change in date is a result of the updated Business Case reflecting changes to business as usual.","fyBaseline":295.9,"fyForecast":229.0,"fyVariance":-23.0,"varianceNarrative":"The budget variance exceeds 5%. N/A - within tolerance","wholeLifeCost":919.0,"costNarrative":"Compared to 2021-Q4, the projects Baseline Whole Life Cost decreased from 1101.26 (£m) to 918.52 (£m). This is primarily due to the following factors: The latest Programme Business Case of June 2021 anticipated whole life costs of £1,882.8m from 2019-20 to 2024-25. Our current budgeted whole life costs reflect: - actual spend from pre-2019 to 2020-21, - 2021-22 actual costs at P11 plus remaining forecast for FY, - 2022-23 to 2024-25 forecasted costs based on SR21, subject to annual business planning.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Approvals & decisions","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 decreased from Amber/red to Amber Compared to 2021-Q4, your project end-date remained scheduled to finish on 30 SEP 2023 . This is primarily due to the following factors: The change in date is a result of the updated Business Case…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"DFE_0010_1819-Q1","year":2023,"name":"T Level Programme","department":"DFE","category":"Government Transformation and Service Delivery","description":"To increase the economic value of skills being supplied by the post 16 system, increasing take-up of high quality qualifications to improve skills, increasing productivity and social mobility. To enable the sustainable delivery of new high quality T Levels for 16-19 year olds.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 decreased from Amber to Red. This is primarily due to the following factors. The current IPA Delivery Confidence Assessment for T Level programme is red, following the Gate 0 review in February 2023. To address challenges to delivery, the February IPA review recommended that the programme's objectives be reviewed and refined and the programme re-baselined to refocus delivery on sustainable growth. The current viability of the programme is not in question and this reset is taking place alongside continued delivery for summer 2023. A review of the progress against the recommendations took place in June, and the programme has subsequently received an Amber rating at the Assurance of Action Plan. The review team noted \"The SRO and programme team are commended for the significant amount of work that has been undertaken by the programme team in a short space of time to address the (letter and the spirit of the) previous recommendations.\"","startDate":"2016-10-25","endDate":"2023-09-30","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2023-09-30. This is primarily due to the following factors. The change in date from 30 September 2023 to 30 September 2025 is a result of the updated Business Case, drafted in September 2021, reflecting changes to business as usual and a revised project end date of 30 September 2025.","fyBaseline":232.2,"fyForecast":248.2,"fyVariance":7.0,"varianceNarrative":"The budget variance exceeds 5%. The budget variance is mainly due to additional CDEL spend for T Levels Specialist Equipment Allocation (SEA) as agreed with HMT. This is partially offset by underspend on RDEL which mainly relates to - changes to Industry Placements Employer Support arrangements - revised forecasts from IfATE due to structural changes - refined delivery plans for Phase Two of T Level Professional Development (TLPD)","wholeLifeCost":1754.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 increased from 919m. to 1754m. This is primarily due to the following factors. At 2122-Q4 the projects total Baseline Whole Life Cost were only until 2022-23. Total Baseline Whole Life Costs have been updated to reflect up to 2024-25 in line with the latest approved Programme Business Case, and current spending review period. Our current budgeted whole life costs reflect:- actual spend from pre-2019 to 2021-22,- 2022-23 actual costs at P11 plus remaining forecast for FY,- 2023-24 to 2024-25 forecasted costs based on the latest Programme Business Case, subject to annual business planning.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. The project did not provide departmental-agree monetised benefits at 22/23-Q4. Not applicable, no monetised benefits realised by this programme","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 decreased from Amber to Red. This is primarily due to the following factors. The current IPA Delivery Confidence Assessment for T Level programme is red, following the Gate 0 review in February 2023. To address challenges to…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"DFE_0010_1819-Q1","year":2024,"name":"T Level Programme","department":"DFE","category":"Government Transformation and Service Delivery","description":"The current IPA Delivery Confidence Assessment for the T Level programme is AMBER, following the Gate 0 review of the programme in March 2024. The review team was impressed with the leadership and management of the T Levels programme, while noting that challenges remain in terms of growing the programme. To address these challenges and to support the programme to scale up, the programme team will: - continue to review and revise its approach to supporting the growing number and variety of providers - continue to focus on increasing employer awareness and engagement with T Levels - ensure a clear route from T Levels to the Advanced British Standard.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 decreased from Red to Amber. This is primarily due to the following factors. The current Infrastructure Project Authority's Delivery Confidence Assessment rating for the T Level Programme is amber following a Gate 0 review in Mar 24. T While the review team was impressed with the leadership and management of the T Levels programme, they noted that challenges remain in terms of scaling up the programme. To address these challenges, the programme team was advised to review and revise its approach to supporting the growing number and variety of providers and continue to focus on increasing employer awareness and engagement with T Levels. The programme team has engaged stakeholders to review these recommendations and to develop a comprehensive action plan to address them.","startDate":"2016-10-25","endDate":"2023-09-30","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2023-09-30. This is primarily due to the following factors. The change in date from 30 September 2023 to 01 September 2028 is a result of the updated Business Case (December 2023). The change reflects when the programme will move to business as usual, once all planned T Levels have been delivered to at least one cohort of students.","fyBaseline":342.0,"fyForecast":249.2,"fyVariance":-27.0,"varianceNarrative":"The budget variance exceeds 5%. Variance of -92.8m (-27%)._x000D_ CDEL - Underspend of 66.1m due to lower spend than estimated for Specialist Equipment Allocation (SEA) and Building & Facilities Improvement Grant (BFIG)._x000D_ RDEL - Underspend of 26.7m due to lower spend than estimated for 16-19 Funding, Industry Placements Employer Support Fund (ESF), and Professional Development (TLPD).","wholeLifeCost":1653.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 decreased from 1754m. to 1653m. This is primarily due to the following factors. This is primarily due to rebaselining the costs in line with the new programme business case.","benefits":0.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 0m. Compared to FY22/23, the programme's departmental-agreed monetised benefits at FY23/24 remained at 0m.","themes":["Cost & funding","Governance & assurance","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 decreased from Red to Amber. This is primarily due to the following factors. The current Infrastructure Project Authority's Delivery Confidence Assessment rating for the T Level Programme is amber following a Gate 0 review in Mar 24.…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"DFE_0010_1819-Q1","year":2025,"name":"T-LEVELS","department":"DfE","category":"Government Transformation and Service Delivery","description":"T Levels are two-year technical qualifications for 16–19-year-olds, offering students practical and knowledge-based learning at a school or college and on-the-job experience through an industry placement of at least 315 hours – approximately 45 days. Equivalent in size to three A levels, a T Level focuses on vocational skills and can help students into skilled employment, higher study or apprenticeships. The T Level programme aims to increase the economic value of skills being supplied by the post-16 system, increasing take-up of high-quality qualifications to improve skills; key to supporting the government’s opportunity and growth missions.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ A NISTA Gate 0 review in June 2025 gave an Amber rating. The programme has been supporting growth of learners, subjects and providers, and T Levels have subsequently seen a 59% increase in student starts in September 2024 to over 25,000 learners. 92% of completers in the first two cohorts (who started their T Level in 2020 and 2021) are in employment or further study, and early evidence suggests that T Level learners who go directly into work, are more likely to remain in the same field than their counterparts on other large Level 3 qualifications. The programme continues to value and respond to feedback from employers, providers and students. In response to the March 2024 NISTA (formerly IPA) review, the department has: • Worked with employers and students to review and implement updated approaches to deliver industry placements and supported employer engagement in a range of priority sectors • Undertaken activity to support increasing awareness for students, teachers and parents • Made changes to reduce duplication in content & assessment in reprocured T Level contracts","startDate":"2016-10-25","endDate":"2028-09-01","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 30/09/2023 to 01/09/2028. This is primarily due to the following factors‚ Following the review of Qualifications Reform which concluded in December 2024, the defunding of large qualifications that overlap with T Levels will now be phased between August 2025 and August 2027. The last planned T Level in Marketing will be introduced in September 2025. The revised project end date reflects these key milestones. The programme continues to prioritise activity to support the scale up of students and providers, the programme is focussing on ensuring that it gathers feedback from providers and awarding organisations, with the aim of surfacing and resolving individual T Level issues and ensuring readiness for steady state delivery.","fyBaseline":351.6,"fyForecast":268.9,"fyVariance":23.52,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ Lower spend than estimated for Specialist Equipment Allocation (SEA) and Building & Facilities Improvement Grant (BFIG).","wholeLifeCost":1653.3,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 1653. This is primarily due to the following factors‚ This is unchanged from last year.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ This is unchanged from last year – no monetised benefits have been calculated for this programme.","themes":["Cost & funding","Governance & assurance","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ A NISTA Gate 0 review in June 2025 gave an Amber rating. The programme has been supporting growth of learners, subjects and providers, and T Levels have subsequently…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"DFE_0010_1819-Q1","year":2026,"name":"T-Levels","department":"DFE","category":"Government Transformation and Service Delivery","description":"T Levels are two-year technical qualifications for 16-19-year-olds, offering students practical and knowledge based learning at a school or college and on-the-job experience through an industry placement of at least 315 hours - approximately 45 days. T Levels are designed to increase the economic value of skills being supplied by the post-16 system, increasing take-up of high-quality qualifications to improve skills, key to supporting the government's opportunity and growth missions. The T Level programme aims to roll-out and support the growth of T Levels to achieve these missions and benefits.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Overall delivery confidence for 2025/26 is Amber. The programme continues to perform strongly on quality, with positive trends in participation, retention, attainment and industry placements, and independent assurance confirms clear benefits for learners and employers. Confidence has improved over the year through stable recruitment in line with forecasts, high completion of industry placements and continued ministerial support, including targeted funding to sustain delivery. The Amber rating reflects ongoing and largely structural challenges in scaling the programme to its agreed steady‑state ambition rather than a decline in performance. Key pressures include the pace required to grow participation, uneven provider and employer capacity to expand placements, and the planned introduction of a new V Level route, all of which could constrain growth despite strong outcomes. Our pathway to Green includes: steps taken to ensure T Levels are accessible by a wider range of students through updates to our delivery framework to improve the quality and availability of industry placements; making improvements to T Levels by streamlining content and reducing assessment to improve deliverability; and setting out the purpose and intent for T Levels alongside V Levels in the response to the Post-16 Level 3 and Below Pathways consultation. This will support the programme in maintaining incremental growth following the initial period of intense scale-up and ensuring T Levels remain an attractive option for students and providers.","startDate":"2016-10-25","endDate":"2028-09-01","scheduleNarrative":"The programme’s planned end date remains 01/09/2028. The programme remains on track to have delivered at least two cohorts on each of the T Levels introduced in scope of this programme by this date. All large (1080+) legacy qualifications in existing T Level areas (with the exception of Health and Social Care) will be defunded in 2027. At that point, T Levels will be the only large (1080+) qualification available for those subjects. Steady State, the point at which we expect student numbers to peak and level, changing only in response to demographic shifts, is expected to be academic year 29/30.","fyBaseline":196.89,"fyForecast":175.31,"fyVariance":10.96,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors: reclaim of the T Level capital funding Specialist Equipment Allocation (SEA), lower than anticipated final costs of the Employer Support Funds (ESF) for Health and Small or Medium Enterprises (SMEs) and Construction, and the closure of IfATE and transfer of some core functions to Skills England and then DfE resulting in some prior costs no longer being in scope of the T Level programme.","wholeLifeCost":2025.0,"costNarrative":"Compared to financial year 24/25-Q4, the programme’s departmentally agreed Whole Life Cost (measured in £m) increase from £1,653m to £1,856m. This reflects the 25/26 budget being agreed and added to the WLC.","benefits":null,"benefitsNarrative":"The T Levels Programme does not yet report on its monetised benefit as longitudinal earnings data has not yet become available. From next year the programme will be able to report on this.","themes":["Cost & funding","Delivery & schedule","Scope & requirements","Workforce & capability"],"evidenceExcerpt":"Overall delivery confidence for 2025/26 is Amber. The programme continues to perform strongly on quality, with positive trends in participation, retention, attainment and industry placements, and independent assurance confirms clear benefits for learners and employers. Confidence has improved over the year through stable recruitment in line with forecasts,…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"DFE_0010_1819-Q1","year":2025,"name":"T-LEVELS","department":"DfE","category":"Government Transformation and Service Delivery","description":"T Levels are two-year technical qualifications for 16–19-year-olds, offering students practical and knowledge-based learning at a school or college and on-the-job experience through an industry placement of at least 315 hours – approximately 45 days. Equivalent in size to three A levels, a T Level focuses on vocational skills and can help students into skilled employment, higher study or apprenticeships. The T Level programme aims to increase the economic value of skills being supplied by the post-16 system, increasing take-up of high-quality qualifications to improve skills; key to supporting the government’s opportunity and growth missions.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ A NISTA Gate 0 review in June 2025 gave an Amber rating. The programme has been supporting growth of learners, subjects and providers, and T Levels have subsequently seen a 59% increase in student starts in September 2024 to over 25,000 learners. 92% of completers in the first two cohorts (who started their T Level in 2020 and 2021) are in employment or further study, and early evidence suggests that T Level learners who go directly into work, are more likely to remain in the same field than their counterparts on other large Level 3 qualifications. The programme continues to value and respond to feedback from employers, providers and students. In response to the March 2024 NISTA (formerly IPA) review, the department has: • Worked with employers and students to review and implement updated approaches to deliver industry placements and supported employer engagement in a range of priority sectors • Undertaken activity to support increasing awareness for students, teachers and parents • Made changes to reduce duplication in content & assessment in reprocured T Level contracts","startDate":"2016-10-25","endDate":"2028-09-01","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 30/09/2023 to 01/09/2028. This is primarily due to the following factors‚ Following the review of Qualifications Reform which concluded in December 2024, the defunding of large qualifications that overlap with T Levels will now be phased between August 2025 and August 2027. The last planned T Level in Marketing will be introduced in September 2025. The revised project end date reflects these key milestones. The programme continues to prioritise activity to support the scale up of students and providers, the programme is focussing on ensuring that it gathers feedback from providers and awarding organisations, with the aim of surfacing and resolving individual T Level issues and ensuring readiness for steady state delivery.","fyBaseline":351.6,"fyForecast":268.9,"fyVariance":23.52,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ Lower spend than estimated for Specialist Equipment Allocation (SEA) and Building & Facilities Improvement Grant (BFIG).","wholeLifeCost":1653.3,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 1653. This is primarily due to the following factors‚ This is unchanged from last year.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ This is unchanged from last year – no monetised benefits have been calculated for this programme.","themes":["Cost & funding","Governance & assurance","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ A NISTA Gate 0 review in June 2025 gave an Amber rating. The programme has been supporting growth of learners, subjects and providers, and T Levels have subsequently…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":0,"attentionScore":22,"attentionReasons":["Current published delivery confidence is Amber","In-year forecast variance is +11.0%"]},{"id":"MOD_0078_1213-Q1","year":2026,"name":"CORE PRODUCTION CAPABILITY","department":"MOD","category":"Military Capability","description":"The Core Production Capability (CPC) delivers the capability required to manufacture nuclear reactor cores for the Royal Navy's nuclear submarine programme. At programme closure, CPC will have provided the Royal Navy with the means to propel a renewed Deterrent submarine fleet plus a UK-based capability to manufacture further cores for a fleet of flexible and adaptable attack submarines delivered under the AUKUS agreement.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 increased to Amber. This is primarily due to the following factors. 1. Reflects delivery of the final core for the Astute class of submarines and increasing maturity of the work required to deliver the core manufacturing capability required for the next generation of UK (and Australian) attack submarines. 2. Work continues with Rolls-Royce Submarines to to ensure timely delivery of the first of a new core type required for the Dreadnought-class of submarines.","startDate":"2012-04-23","endDate":"2043-12-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same from 31/12/2043 to 31/12/2043.","fyBaseline":403.39,"fyForecast":372.04,"fyVariance":7.77,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to savings identified in year which reduced anticipated programme costs associated with the transport of completed reactor cores to the shipbuilder.","wholeLifeCost":7784.34,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally-agreed Whole Life Cost at 25/26-Q4 increased from £5930.6M to £8877.8M. This is primarily due to an expansion in the programme scope to create the manufacturing capability needed to produce cores for the next generation UK and Australian attack submarines. This cost increase is based on early estimates for the work required and will change as detailed design and planning work proceeds and is reflected in Departmental budgets allocated to the programme.","benefits":null,"benefitsNarrative":"Compared to financial year 2024/25-Q4, the project's departmental-agreed monetised benefits at 2025/26-Q4 remained at £0m.","themes":["Cost & funding","Delivery & schedule","Scope & requirements","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 increased to Amber. This is primarily due to the following factors. 1. Reflects delivery of the final core for the Astute class of submarines and increasing maturity of the work required to deliver the core manufacturing capability required for the…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"MOD_0078_1213-Q1","year":2020,"name":"Core Production Capability","department":"MOD","category":"Military Capability","description":"Delivers safe nuclear reactor cores to meet the Royal Navy's submarine programme, now and for the long term.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber, which has not changed since last year�s Q2 1819 Amber, due primarily to the following factors; - The Core Production Capability (CPC) Project is the phased regeneration of the current nuclear core production facilities on the Rolls-Royce Site at Raynesway in Derby, the sustainment of the current capability and the production, development and manufacture of the nuclear reactor cores to meet Astute and Dreadnought technical specifications. The Amber Delivery Confidence Assessment (DCA) recognised completion of significant work to re-baseline the CPC project and enhance governance arrangements. - The DCA remains Amber to recognise the remaining schedule and technical risk in delivering a new core to meet the Dreadnought build programme.","startDate":"2012-04-01","endDate":"2028-04-30","scheduleNarrative":"The scheduled baseline project end date at Q2 1920 (30th September 2019) is 30/04/28, has not changed since last year's Q2 1819 date of 30/04/28, due primarily to the following factors; - The baseline end date remains unchanged at 30 April 2028 and will be revised once Phase 2 infrastructure designs have matured.","fyBaseline":163.58,"fyForecast":163.11,"fyVariance":0.0,"varianceNarrative":"Budget variance less than 5%","wholeLifeCost":1826.71,"costNarrative":"The baseline Whole Life Cost at Q2 1920 (30th September 2019) is �1,826.71 m, has increased by �167.48 m since last year's Q2 1819 (�m) baseline Whole Life Cost of �1,659.23 m, due primarily to the following factors; - A re-baselining of the CPC project was approved in early 2019 which incorporated a revised scope and updated cost estimates.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Scope & requirements","Technical & integration"],"evidenceExcerpt":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber, which has not changed since last year�s Q2 1819 Amber, due primarily to the following factors; - The Core Production Capability (CPC) Project is the phased regeneration of the current nuclear core production facilities on the Rolls-Royce Site at Raynesway in…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2020","sourceLabel":"IPA Annual Report 2019-20"},{"id":"MOD_0078_1213-Q1","year":2021,"name":"Core Production Capability","department":"MOD","category":"Military Capability","description":"Delivers safe nuclear reactor cores to meet the Royal Navy's submarine programme, now and for the long term.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber. This is primarily due to the following factors: Although significant progress has been made in delivering new manufacturing capability since the last transparency return, the magnitude of the remaining risk is not yet sufficiently low to declare an improved delivery confidence.","startDate":"2012-04-23","endDate":"2028-04-30","scheduleNarrative":"Compared to financial year 19/20-Q2, the project's end-date remained scheduled to finish on 30 April 2028 . This is primarily due to the following factors:","fyBaseline":142.22,"fyForecast":141.01,"fyVariance":-1.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":1826.16,"costNarrative":"Compared to financial year 19/20-Q2, the projects Baseline Whole Life Cost decreased from 1826.71m to �1826.16m. This is primarily due to the following factors: The forecast costs for the programme have remained broadly stable with a minor reduction in residual risk as a result of the project's robust governance structures.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber. This is primarily due to the following factors: Although significant progress has been made in delivering new manufacturing capability since the last transparency return, the magnitude of the remaining risk is not yet…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21"},{"id":"MOD_0078_1213-Q1","year":2022,"name":"Core Production Capability","department":"MOD","category":"Military Capability","description":"Delivers safe nuclear reactor cores to meet the Royal Navy's submarine programme, now and for the long term.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating decreased from Amber to Red. This is primarily due to the following factors: Significant and ongoing challenges associated with achieving the required core delivery date for Dreadnought and the importance of that milestone to sustaining the Continuous at Sea Deterrent.","startDate":"2012-04-01","endDate":"2028-04-30","scheduleNarrative":"Compared to 2021-Q4, the project end-date remained scheduled to finish on 30 April 2028.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 26 of the Freedom of Information Act 2000 (Defence)","wholeLifeCost":null,"costNarrative":"Exempt under Section 26 of the Freedom of Information Act 2000 (Defence)","benefits":null,"benefitsNarrative":"","themes":["Delivery & schedule","Cost & funding"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating decreased from Amber to Red. This is primarily due to the following factors: Significant and ongoing challenges associated with achieving the required core delivery date for Dreadnought and the importance of that milestone to sustaining the…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"MOD_0078_1213-Q1","year":2023,"name":"Core Production Capability","department":"MOD","category":"Military Capability","description":"The Core Production Capability (CPC) delivers safe nuclear reactor cores to meet the Royal Navy's submarine programme; now and for the long term. At programme closure; CPC will have provided the Royal Navy with the means to propel a renewed Deterrent submarine fleet; and will have provided the UK with a modern; safe; and Sovereign capability to manufacture further cores for a fleet of flexible and adaptable attack submarines.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Red. This is primarily due to the following factors. Significant and ongoing challenges associated with achieving the required core delivery date for Dreadnought and the importance of that milestone to sustaining the Continuous at Sea Deterrent.","startDate":"2012-04-23","endDate":"2028-04-30","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2028-04-30. This is primarily due to the following factors. Whilst the programme schedule has been maintained compared to 12 months ago, in future this schedule will be revised to incorporate the completion of the infrastructure design phase.","fyBaseline":171.38,"fyForecast":178.46,"fyVariance":4.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":3772.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 22/23-Q4 is 3772m. This is primarily due to the following factors. This represents the full costs including budget estimates for scope that has not yet been approved.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This programme does not report cashable benefits. Its aim is to provision the armed forces with the equipment and / or infrastructure required.","themes":["Delivery & schedule","Cost & funding","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Red. This is primarily due to the following factors. Significant and ongoing challenges associated with achieving the required core delivery date for Dreadnought and the importance of that milestone to sustaining the…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"MOD_0078_1213-Q1","year":2024,"name":"Core Production Capability","department":"MOD","category":"Military Capability","description":"The Core Production Capability programme delivers safe nuclear reactor cores to meet the Royal Navy's submarine programme, now and for the long term. At closure, the programme will have provided the Royal Navy with the means to propel a renewed Deterrent submarine fleet, and will have provided the UK with a modern, safe, and Sovereign capability to manufacture further cores for a fleet of flexible and adaptable attack submarines delivered under the AUKUS agreement.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure and Projects Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Red. This is primarily due to the following factors. Ongoing challenges associated with achieving the required delivery date for the first Dreadnought submarine nuclear core and the importance of that milestone to sustaining the Continuous at Sea Deterrent. The programme is working closely with the supplier to address the risks involved to ensure core delivery remains aligned to Dreadnought Boat 1 delivery progress, whilst delivering the last core for the Astute-class of submarines.","startDate":"2012-04-23","endDate":"2028-04-30","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained scheduled to finish on 2028-04-30. This will need to be revised to reflect scope changes later this year as a result of core requirements for AUKUS, the revised scope will likely be approved in mid 2024.","fyBaseline":255.8,"fyForecast":249.18,"fyVariance":-2.588,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":4051.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 increased from 3772m to 4051m. This is primarily due to the following factors. Inflation cost increases.","benefits":0.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 0m.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure and Projects Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Red. This is primarily due to the following factors. Ongoing challenges associated with achieving the required delivery date for the first Dreadnought submarine nuclear core and the importance of that milestone to…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"MOD_0078_1213-Q1","year":2025,"name":"CORE PRODUCTION CAPABILITY","department":"MoD","category":"Military Capability","description":"The Core Production Capability (CPC) delivers safe nuclear reactor cores to meet the Royal Navy's submarine programme, now and for the long term. At programme closure, CPC will have provided the Royal Navy with the means to propel a renewed Deterrent submarine fleet, and will have provided the UK with a modern, safe, and Sovereign capability to manufacture further cores for a fleet of flexible and adaptable attack submarines delivered under the AUKUS agreement.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at RED. This is primarily due to the following factors. Ongoing challenges associated with achieving the required delivery date for the first Dreadnought submarine nuclear core and the importance of that milestone to sustaining the Continuous at Sea Deterrent. Work continues with Rolls-Royce Submarines to address the risks involved and ensure core delivery remains aligned to Dreadnought Boat 1 delivery progress, whilst also delivering the last core for the Astute class of submarines.","startDate":"2012-04-23","endDate":"2043-12-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 30/04/2028 to 31/12/2043. This is primarily due to the following factors. Increased scope. Programme end-date has been adjusted as this is the date by which the core manufacturing capabilities necessary to manufacture cores for the next generation of UK (and Australian) attack submarines is planned to achieve Full Operating Capability. This element of the programme was given Ministerial Approval in October 24 and the increased scope has now been incorporated.","fyBaseline":348.39,"fyForecast":368.79,"fyVariance":5.86,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. Inflationary pressures on purchases of specialist materials, additional operating costs to increase production rates and delays to keys elements of the programme.","wholeLifeCost":5930.6,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 4051 to 5930. This is primarily due to the following factors. Scope change to generate the manufacturing capability to deliver cores for the next generation UK and Australian attack submarines. This cost increase reflects early estimates for some of the work required to generate this capability and will change/increase as detailed design and development work proceeds and is reflected in Departmental budgets allocated to the programme.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits","themes":["Cost & funding","Delivery & schedule","Scope & requirements","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at RED. This is primarily due to the following factors. Ongoing challenges associated with achieving the required delivery date for the first Dreadnought submarine nuclear core and the importance of that milestone to sustaining the Continuous at Sea…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"MOD_0078_1213-Q1","year":2026,"name":"CORE PRODUCTION CAPABILITY","department":"MOD","category":"Military Capability","description":"The Core Production Capability (CPC) delivers the capability required to manufacture nuclear reactor cores for the Royal Navy's nuclear submarine programme. At programme closure, CPC will have provided the Royal Navy with the means to propel a renewed Deterrent submarine fleet plus a UK-based capability to manufacture further cores for a fleet of flexible and adaptable attack submarines delivered under the AUKUS agreement.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 increased to Amber. This is primarily due to the following factors. 1. Reflects delivery of the final core for the Astute class of submarines and increasing maturity of the work required to deliver the core manufacturing capability required for the next generation of UK (and Australian) attack submarines. 2. Work continues with Rolls-Royce Submarines to to ensure timely delivery of the first of a new core type required for the Dreadnought-class of submarines.","startDate":"2012-04-23","endDate":"2043-12-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same from 31/12/2043 to 31/12/2043.","fyBaseline":403.39,"fyForecast":372.04,"fyVariance":7.77,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to savings identified in year which reduced anticipated programme costs associated with the transport of completed reactor cores to the shipbuilder.","wholeLifeCost":7784.34,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally-agreed Whole Life Cost at 25/26-Q4 increased from £5930.6M to £8877.8M. This is primarily due to an expansion in the programme scope to create the manufacturing capability needed to produce cores for the next generation UK and Australian attack submarines. This cost increase is based on early estimates for the work required and will change as detailed design and planning work proceeds and is reflected in Departmental budgets allocated to the programme.","benefits":null,"benefitsNarrative":"Compared to financial year 2024/25-Q4, the project's departmental-agreed monetised benefits at 2025/26-Q4 remained at £0m.","themes":["Cost & funding","Delivery & schedule","Scope & requirements","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 increased to Amber. This is primarily due to the following factors. 1. Reflects delivery of the final core for the Astute class of submarines and increasing maturity of the work required to deliver the core manufacturing capability required for the…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"MOD_0078_1213-Q1","year":2025,"name":"CORE PRODUCTION CAPABILITY","department":"MoD","category":"Military Capability","description":"The Core Production Capability (CPC) delivers safe nuclear reactor cores to meet the Royal Navy's submarine programme, now and for the long term. At programme closure, CPC will have provided the Royal Navy with the means to propel a renewed Deterrent submarine fleet, and will have provided the UK with a modern, safe, and Sovereign capability to manufacture further cores for a fleet of flexible and adaptable attack submarines delivered under the AUKUS agreement.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at RED. This is primarily due to the following factors. Ongoing challenges associated with achieving the required delivery date for the first Dreadnought submarine nuclear core and the importance of that milestone to sustaining the Continuous at Sea Deterrent. Work continues with Rolls-Royce Submarines to address the risks involved and ensure core delivery remains aligned to Dreadnought Boat 1 delivery progress, whilst also delivering the last core for the Astute class of submarines.","startDate":"2012-04-23","endDate":"2043-12-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 30/04/2028 to 31/12/2043. This is primarily due to the following factors. Increased scope. Programme end-date has been adjusted as this is the date by which the core manufacturing capabilities necessary to manufacture cores for the next generation of UK (and Australian) attack submarines is planned to achieve Full Operating Capability. This element of the programme was given Ministerial Approval in October 24 and the increased scope has now been incorporated.","fyBaseline":348.39,"fyForecast":368.79,"fyVariance":5.86,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. Inflationary pressures on purchases of specialist materials, additional operating costs to increase production rates and delays to keys elements of the programme.","wholeLifeCost":5930.6,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 4051 to 5930. This is primarily due to the following factors. Scope change to generate the manufacturing capability to deliver cores for the next generation UK and Australian attack submarines. This cost increase reflects early estimates for some of the work required to generate this capability and will change/increase as detailed design and development work proceeds and is reflected in Departmental budgets allocated to the programme.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits","themes":["Cost & funding","Delivery & schedule","Scope & requirements","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at RED. This is primarily due to the following factors. Ongoing challenges associated with achieving the required delivery date for the first Dreadnought submarine nuclear core and the importance of that milestone to sustaining the Continuous at Sea…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":-1,"transition":"Improved","endDateDeltaDays":0,"attentionScore":21,"attentionReasons":["Current published delivery confidence is Amber","In-year forecast variance is +7.8%"]},{"id":"MHCLG_0004_2021-Q4","year":2026,"name":"HOUSING INFRASTRUCTURE FUND","department":"MHCLG","category":"Infrastructure and Construction","description":"The Housing Infrastructure Fund (HIF) provides capital funding for critical infrastructure, such as transport, utilities and site remediation, to unlock housing delivery. The programme is expected to unlock the construction of circa 255k homes.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. The rating reflects the delivery broadly in line with expectations alongside ongoing complexity in the final stages of the programme. Homes England and MHCLG have proactively managed risk across the largest and most complex Forward Fund projects, where the majority of remaining activity is concentrated. While delivery remains stable, external market, economic and environmental factors continue to impact progress at project level and require active mitigation. The programme has responded to assurance findings, implementing NISTA recommendations including revisions to delegated authority limits to streamline decision-making and further development of the risk and controls framework to reflect programme maturity. With the National Housing Delivery Fund now approved and launched, HIF will transition into a unified governance structure, strengthening oversight and ensuring consistent management of delivery, risk, cost and performance across legacy and successor activity.","startDate":"2016-12-30","endDate":"2028-03-31","scheduleNarrative":"There has been no change to the schedule for the programme.","fyBaseline":516.47,"fyForecast":470.17,"fyVariance":8.96,"varianceNarrative":"The in-year budget variance exceeds 5%, reflecting reduced close-down costs, programme delays and under-utilised contingency, alongside the withdrawal of a scheme. Delivery risk continues to be actively managed across the largest and most complex projects, where the majority of remaining HIF expenditure is concentrated.","wholeLifeCost":4250.15,"costNarrative":"The WLC has decreased by £131m, reflecting a number of material amendments across the programme and adjustments for inflation in real terms. These include project withdrawals and changes to delivery scope and timing, with some costs being deferred into later years as schemes progress. The incorporation of HIF headroom into the NHDF portfolio has also contributed to changes in future expenditure projections.","benefits":10600.36,"benefitsNarrative":"Change requests this Financial Year have had a mixture of positive and negative impacts on monetised benefits resulting in no significant changes to monetised benefits. The programme delivers benefits through enabling infrastructure (including roads, rail and schools) and the unlocking of net additional homes, alongside wider economic and regeneration impacts. Evidence gathered through the HIF Benefits Strategy is informing the approach to reporting both monetisable and non-monetisable outcomes.","themes":["Delivery & schedule","Cost & funding","Governance & assurance","Commercial & supply chain"],"evidenceExcerpt":"The SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. The rating reflects the delivery broadly in line with expectations alongside ongoing complexity in the final stages of the programme. Homes England and MHCLG have proactively managed risk across the largest and most complex Forward Fund projects, where the majority of…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"MHCLG_0004_2021-Q4","year":2021,"name":"Housing Infrastructure Fund","department":"MHCLG","category":"Infrastructure and Construction","description":"The Housing Infrastructure Fund supports the government's ambition to increase housebuilding to 300,000 per year by the mid-2020s, by providing up-front infrastructure to drive housing delivery. HIF will provide local authorities with �4.37bn of infrastructure funding to unlock 326,000 homes in all regions of England.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber.This is primarily due to the following factors: IPA carried out a Gate 0 review in November 2020, and gave HIF an amber delivery confidence rating, which is what would be expected for a programme of this size and complexity. HIF's migration on to the Government Major Projects Portfolio will provide additional IPA oversight and resources to support the programme.","startDate":"2016-12-30","endDate":"2028-03-31","scheduleNarrative":"The project end-date is 31 March 2028. This is primarily due to the following factors: HIF is on schedule and due for completion in 2028. HIF has completed the contracting stage and is moving into the delivery stage which will be complete by 2024 for the majority of the projects.","fyBaseline":270.3,"fyForecast":238.2,"fyVariance":-12.0,"varianceNarrative":"The budget variance exceeds 5%. CDEL drawn down during FY20/21 was �32m less than the Supplementary Estimate. This is primarily as a consequence of challenges faced by local authorities and their delivery partners during the C-19 pandemic.","wholeLifeCost":4361.56,"costNarrative":"The projects Baseline Whole Life Cost is �4361.56m. This is primarily due to the following factors: The Whole Life Cost is as set out as �4.37 Billion. Quarter 4 20/21 is the HIF programme's first quarterly report for GMPP.","benefits":null,"benefitsNarrative":"","themes":["Delivery & schedule","Cost & funding","Governance & assurance","Technical & integration"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber.This is primarily due to the following factors: IPA carried out a Gate 0 review in November 2020, and gave HIF an amber delivery confidence rating, which is what would be expected for a programme of this size and complexity. HIF's migration on to the Government Major…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21"},{"id":"MHCLG_0004_2021-Q4","year":2022,"name":"Housing Infrastructure Fund","department":"DLUHC","category":"Infrastructure and Construction","description":"The Housing Infrastructure Fund (HIF) supports the Government's ambition to increase housebuilding to 300,000 per year by mid 2020's, by providing up-front infrastructure to drive housing delivery. HIF will provide local authorities with £4.3 billion of infrastructure funding to unlock building of 320,000 homes in all regions of England.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The latest Gate 0 Review gave Housing Infrastructure Fund (HIF) an Amber rating. The report recognises progress, noting that homes are already being delivered on some smaller sites, and good collaborative working with delivery partners. The Amber rating takes into account the current inflationary environment and rising risks to delivery. Work is underway to progress actions based on the report's recommendations; a reference class forecast is being developed to better understand the cost and schedule parameters, an Accounting Officer review is underway to provide further assurance on programme delivery, and Homes England have commissioned independent reviews at a project level on costs and schedule risks as projects move from early, post-contract work, into on-site delivery. We will have the results of the ten most high-risk projects by Q2 2022/23, to make decisions through programme governance by Q3 2022/23. The business case is being updated ahead of the next Gate 0 Review due in Q3 2022/23.","startDate":"2016-12-30","endDate":"2028-03-31","scheduleNarrative":"Compared to 2021-Q4, your project end-date remained scheduled to finish on 31 MAR 2028. HIF is now in its delivery stage, with all remaining schemes contracted during 2021/22, over 90% of homes unlocked (i.e. with post-contract conditions sufficiently discharged to allow draw-down of funding to begin), and c.60 schemes on site. However, it is operating within an unprecedented and complex economic climate, taking into account impacts of the pandemic and wider inflationary pressures. HIF is facing cost and scheduling challenges which may extend the expected delivery timescales for some schemes. Work is taking place to understand and respond to these pressures, and the appropriate governance exists to support this work and ensure the programme remains able to deliver on its objectives.","fyBaseline":901.5,"fyForecast":393.3,"fyVariance":-56.0,"varianceNarrative":"Funding drawn on national schemes is lower than forecast, this is due to the following reasons reported by Homes England: - Delivery challenges arising from the pandemic, this includes the impact on local authorities (LA), such as re-allocating project staff onto Covid response related work, delays to activities such as survey work, planning decisions, site closures and reduced site productivity. It also includes the impact on LA development partners and current supply chain shortages and disruption for both labour and materials. - Withdrawal of several schemes from the programme in 2021. - There have also been delays in London which caused an underspend in this area. - Finally, decisions needed on funding increases, within the portfolio, have further shifted spend into future years.","wholeLifeCost":4334.0,"costNarrative":"Compared to 2021-Q4, the projects Baseline Whole Life Cost decreased from 4361.56 (£m) to 4334.96 (£m). This small movement relates to a correction to last year's figure rather than reduction to the forecast.","benefits":null,"benefitsNarrative":"","themes":["Delivery & schedule","Cost & funding","Governance & assurance","Commercial & supply chain"],"evidenceExcerpt":"The latest Gate 0 Review gave Housing Infrastructure Fund (HIF) an Amber rating. The report recognises progress, noting that homes are already being delivered on some smaller sites, and good collaborative working with delivery partners. The Amber rating takes into account the current inflationary environment and rising risks to delivery. Work is underway to…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"MHCLG_0004_2021-Q4","year":2023,"name":"Housing Infrastructure Fund","department":"DLUHC","category":"Infrastructure and Construction","description":"The Housing Infrastructure Fund is a 4.2bn major government programme which provides funding for infrastructure projects, which once built, will unlock housing capacity in areas of high housing demand. Through funding 124 infrastructure schemes in all regions of England, HIF is expected to unlock the construction of up to 300,000 homes.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 decreased from Amber to Red. This is primarily due to the following factors. The programmes delivery confidence rating remained at RED, due to increasing inflationary pressures impacting costs and causing delays in delivery. Since the IPA Gate 0 review, work has focused on resetting programme management processes to improve delivery oversight and forecasting, through a Business Case reset, aiming to: - Maximise unlocked housing and infrastructure delivery, whilst being deliverable within time and cost constraints and within grant funding agreements. - Ensure the programme is on sustainable financial and delivery footing, through reprofiling the budget and noting the need for extended funding availability period. - Provide increased assurance on forecasting, contractual management and change control. - Improve programme and project level reporting, introducing monthly Forward Funding scheme reports to manage project level performance against baselines, aggregated for programme oversight. - Provide robust governance and decision-making methodology as schemes go into default, seek to remediate, or request a Material Change to address challenges faced","startDate":"2016-12-30","endDate":"2028-03-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2028-03-31. This is primarily due to the following factors. Delayed delivery is primarily due to macro-economic factors impacting the sector. The pandemic, inflation, the war in Ukraine, and supply chain issues have led to additional pressures, with underspends predicted across the current spending period. The updated Business Case recognises these challenges and seeks to reprofile the budget. Time-extension decisions at a project level will be made case-by-case, and the programme will streamline decision-making to drive delivery. The Housing Infrastructure Fund (HIF) will boost resources with additional posts and third-party support within Homes England and DLUHC, to build adequate capacity and capability. The programmes end date is unchanged due to the reset through the business case, including changes to underlying cost/time assumptions; descoping projects getting them back on track or removing/withdrawing them from the programme. The team has implemented quarterly portfolio prioritisation reviews of projects, based on deliverability, value for money and strategic fit to inform decisions on change requests.","fyBaseline":1049.9,"fyForecast":450.2,"fyVariance":-57.0,"varianceNarrative":"The budget variance exceeds 5%. The funding drawn in year is lower than forecasted primarily due to the macro-economic factors described which have raised costs across the larger Forward Funding portfolio. In addition to this, contractor appetite, resourcing, and Local Authority capacity have contributed to delay in funding being drawn and spend being deferred into future years.","wholeLifeCost":4334.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 remained at 4334m. This is primarily due to the following factors. Diverted resources will be used to support better performing projects. The whole life cost reflects the natural shift of the programme level budgets against the mitigations that the HIF team has put into place, as projects progress in their lifecycle, shifting costs over time, and in some cases withdraw from the programme. Attrition is due to the withdrawal of one Forward Funding and three Marginal Viability Fund schemes, and the reduction of the resourcing expenditure in future years due to budgetary constraints.","benefits":18400.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 18400m. The project's departmental-agree monetised benefits at 22/23-Q4 is 18400m. The current value of 18.4bn is the sum of the final moderated bids that was used to make the original project approvals, plus the removal of the costs and benefits associated with the schemes that were known to be withdrawing at the time it was last calculated (in 2021). The land value uplift estimates within the moderated bids for Forward Funding schemes were based on development appraisals undertaken at the time to support bids. Benefits are under review and have been outlined in the Business case reset.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 decreased from Amber to Red. This is primarily due to the following factors. The programmes delivery confidence rating remained at RED, due to increasing inflationary pressures impacting costs and causing delays in delivery. Since…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"MHCLG_0004_2021-Q4","year":2024,"name":"Housing Infrastructure Fund","department":"DLUHC","category":"Infrastructure and Construction","description":"The Housing Infrastructure Fund (HIF) provides funding for infrastructure projects, which once built, will unlock housing capacity in areas of high demand. The programme is expected to unlock the construction of circa 260k homes.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 decreased from Red to Amber. This is primarily due to the following factors. As at March 24: We continue to assess the delivery confidence of the programme as amber._x000D_ _x000D_ To maintain delivery confidence, the programme continues to embed new processes developed through the business case reset, along with implementing IPA recommendations.","startDate":"2016-12-30","endDate":"2028-03-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2028-03-31. This is primarily due to the following factors. As at March 24: The project's end-date is March 2028. This is an extension from March 2026 as agreed in a revised business case in 2023.","fyBaseline":499.4,"fyForecast":543.3,"fyVariance":9.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The 2023 refreshed HIF business case re-baselined the cost profile and unlocked delivery for a number of projects that had been stalled, enabling some local authorities to deliver faster than forecast.","wholeLifeCost":4257.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 decreased from 4334m. to 4257m. This is primarily due to the following factors. Whole life cost decreased from 4334m to 4257m due to a re-baseline in 2023.","benefits":11600.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 2324-Q4 decreased from 18400m. to 11600m. Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 2324-Q4 decreased from 18400m. to 11600m. This is due to projects descoping or withdrawing from the programme on deliverability grounds.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 decreased from Red to Amber. This is primarily due to the following factors. As at March 24: We continue to assess the delivery confidence of the programme as amber._x000D_ _x000D_ To maintain delivery confidence, the programme…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"MHCLG_0004_2021-Q4","year":2025,"name":"HOUSING INFRASTRUCTURE FUND","department":"MHCLG","category":"Infrastructure and Construction","description":"The Housing Infrastructure Fund (HIF) provides funding for infrastructure projects which, once delivered, will unlock housing capacity, mainly in areas of high demand. The programme is expected to unlock the construction of circa 255k homes.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors: Spend has continued to accelerate and delivery is on a sound footing. Market and economic conditions and other factors, including environmental, do however continue to impact delivery of individual projects, and these are being managed carefully. To maintain delivery confidence, we are closely monitoring programme headroom, to avoid a programme-level under- or over-spend and unnecessary loss of unlocked housing. We are also implementing recommendations from HIF’s most recent NISTA annual review, including further streamlining decision-making processes and updating our forecasting model to more accurately reflect the maturity of the programme.","startDate":"2016-12-30","endDate":"2028-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2028. This is primarily due to the following factors: The HIF programme spend deadline remains 31/03/28, as agreed in the revised business case in 2023.","fyBaseline":744.8,"fyForecast":740.0,"fyVariance":0.64,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":4263.7,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 4257 to 4263.7. This is primarily due to the following factors: Since the 2023 business case reset, there has been a slight increase in total forecast RDEL and CDEL spend, including an adjustment in legal and evaluation costs.","benefits":11700.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 11600 to 11700. This is primarily due to the following factors: Programme monetised benefits estimates are reviewed periodically to account for projects descoping or withdrawing from the programme on deliverability grounds. Most significant project changes and withdrawals were factored into the end-FY 23/24 estimate. Change requests since then have been relatively minor, with a mixture of positive and negative impacts on monetised benefits leading to a slight programme-level increase.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors: Spend has continued to accelerate and delivery is on a sound footing. Market and economic conditions and other factors, including environmental, do however continue…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"MHCLG_0004_2021-Q4","year":2026,"name":"HOUSING INFRASTRUCTURE FUND","department":"MHCLG","category":"Infrastructure and Construction","description":"The Housing Infrastructure Fund (HIF) provides capital funding for critical infrastructure, such as transport, utilities and site remediation, to unlock housing delivery. The programme is expected to unlock the construction of circa 255k homes.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. The rating reflects the delivery broadly in line with expectations alongside ongoing complexity in the final stages of the programme. Homes England and MHCLG have proactively managed risk across the largest and most complex Forward Fund projects, where the majority of remaining activity is concentrated. While delivery remains stable, external market, economic and environmental factors continue to impact progress at project level and require active mitigation. The programme has responded to assurance findings, implementing NISTA recommendations including revisions to delegated authority limits to streamline decision-making and further development of the risk and controls framework to reflect programme maturity. With the National Housing Delivery Fund now approved and launched, HIF will transition into a unified governance structure, strengthening oversight and ensuring consistent management of delivery, risk, cost and performance across legacy and successor activity.","startDate":"2016-12-30","endDate":"2028-03-31","scheduleNarrative":"There has been no change to the schedule for the programme.","fyBaseline":516.47,"fyForecast":470.17,"fyVariance":8.96,"varianceNarrative":"The in-year budget variance exceeds 5%, reflecting reduced close-down costs, programme delays and under-utilised contingency, alongside the withdrawal of a scheme. Delivery risk continues to be actively managed across the largest and most complex projects, where the majority of remaining HIF expenditure is concentrated.","wholeLifeCost":4250.15,"costNarrative":"The WLC has decreased by £131m, reflecting a number of material amendments across the programme and adjustments for inflation in real terms. These include project withdrawals and changes to delivery scope and timing, with some costs being deferred into later years as schemes progress. The incorporation of HIF headroom into the NHDF portfolio has also contributed to changes in future expenditure projections.","benefits":10600.36,"benefitsNarrative":"Change requests this Financial Year have had a mixture of positive and negative impacts on monetised benefits resulting in no significant changes to monetised benefits. The programme delivers benefits through enabling infrastructure (including roads, rail and schools) and the unlocking of net additional homes, alongside wider economic and regeneration impacts. Evidence gathered through the HIF Benefits Strategy is informing the approach to reporting both monetisable and non-monetisable outcomes.","themes":["Delivery & schedule","Cost & funding","Governance & assurance","Commercial & supply chain"],"evidenceExcerpt":"The SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. The rating reflects the delivery broadly in line with expectations alongside ongoing complexity in the final stages of the programme. Homes England and MHCLG have proactively managed risk across the largest and most complex Forward Fund projects, where the majority of…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"MHCLG_0004_2021-Q4","year":2025,"name":"HOUSING INFRASTRUCTURE FUND","department":"MHCLG","category":"Infrastructure and Construction","description":"The Housing Infrastructure Fund (HIF) provides funding for infrastructure projects which, once delivered, will unlock housing capacity, mainly in areas of high demand. The programme is expected to unlock the construction of circa 255k homes.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors: Spend has continued to accelerate and delivery is on a sound footing. Market and economic conditions and other factors, including environmental, do however continue to impact delivery of individual projects, and these are being managed carefully. To maintain delivery confidence, we are closely monitoring programme headroom, to avoid a programme-level under- or over-spend and unnecessary loss of unlocked housing. We are also implementing recommendations from HIF’s most recent NISTA annual review, including further streamlining decision-making processes and updating our forecasting model to more accurately reflect the maturity of the programme.","startDate":"2016-12-30","endDate":"2028-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2028. This is primarily due to the following factors: The HIF programme spend deadline remains 31/03/28, as agreed in the revised business case in 2023.","fyBaseline":744.8,"fyForecast":740.0,"fyVariance":0.64,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":4263.7,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 4257 to 4263.7. This is primarily due to the following factors: Since the 2023 business case reset, there has been a slight increase in total forecast RDEL and CDEL spend, including an adjustment in legal and evaluation costs.","benefits":11700.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 11600 to 11700. This is primarily due to the following factors: Programme monetised benefits estimates are reviewed periodically to account for projects descoping or withdrawing from the programme on deliverability grounds. Most significant project changes and withdrawals were factored into the end-FY 23/24 estimate. Change requests since then have been relatively minor, with a mixture of positive and negative impacts on monetised benefits leading to a slight programme-level increase.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors: Spend has continued to accelerate and delivery is on a sound footing. Market and economic conditions and other factors, including environmental, do however continue…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":0,"attentionScore":21,"attentionReasons":["Current published delivery confidence is Amber","In-year forecast variance is +9.0%"]},{"id":"DFT_0439_2425-Q3","year":2026,"name":"PUBLIC OWNERSHIP TRANSITION PROGRAMME","department":"DFT","category":"Government Transformation and Service Delivery","description":"The Programme will transfer the remaining privately operated passenger rail contracts, for which the Secretary of State is responsible, into public ownership. These will be transferred to DfT Operator Limited (DFTO) whose functions will eventually be integrated into Great British Railways (GBR). The aim is to complete all transfers into public ownership by the end of 2027. Richard Goodman served as interim SRO from 24 December 2025 to 31 March 2026 during the programme’s transfer from DfT to DFTO. Alex Hynes assumed SRO responsibilities from 1 April 2026.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 2024/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating for 2025/26 Q4 has remained at Amber. Good progress continues to be made with South Western Railway, c2c, Greater Anglia and West Midlands Trains successfully transferred into public ownership. Work is progressing well on the Govia Thameslink Railway transfer scheduled for 31 May 2026, with further transfers scheduled (including Chiltern Railways on 20 September 2026 and Great Western Railway on 13 December 2026). This indicates that the Programme has a good chance of successful completion, although larger, more complex transfers remain.","startDate":"2024-12-04","endDate":"2027-12-31","scheduleNarrative":"The programme is progressing on time and as planned; the services of South Western Railway, c2c, Greater Anglia and West Midlands have successfully transferred into public ownership. The SoS has also issued expiry notices confirming the planned transfer of Govia Thameslink Railway (GTR) services on 31 May 2026, Chiltern services on 20 September 2026 and Great Western Railway services on 13 December 2026. Work on the GTR transfer is well advanced with work on Chiltern now progressing to plan. Decisions regarding the timing of the final three transfers will be made by the SoS later with the full programme of transitions into public ownership expected to be completed by the end of 2027. Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remains the same. There is a risk that a Train Operating Company may default, which could necessitate unplanned transfers and exacerbate capacity and capability pressures across the department and DFTO. While the likelihood of default is considered low and the risk is regarded as manageable, the programme continues to plan for this. The transfer of DFT Rail Services Group staff to DFTO took place at the end of March 2026.","fyBaseline":9.77,"fyForecast":10.73,"fyVariance":9.81,"varianceNarrative":"The budget variance exceeds 5% due to the delivery of the scheduled volume of work for the 2025/26 financial year, in order to meet the programme’s public commitments and ensure the transfers are delivered safely and effectively.","wholeLifeCost":36.6,"costNarrative":"Compared to Q4 of the 2024/25 financial year, the project’s departmentally agreed Whole Life Cost at Q4 of 2025/26 (measured in £m) has remained the same.","benefits":110.0,"benefitsNarrative":"Under public ownership, passenger services will be operated in the interests of passengers rather than shareholders. This represents a vital step towards wider reform, bringing track and train together under Great British Railways (GBR). Public ownership will save taxpayers up to an estimated £110-150 million every year on fees paid to privately-owned train operating companies, once all services currently delivered under contract with the Department have transferred. The Government is taking the railways into public ownership at the lowest reasonable cost to the taxpayer, enabling long-overdue improvements to make everyday journeys easier. Each transfer will involve some mobilisation and due diligence costs. These costs are expected to be a small fraction of the £110-150m per year in fees to private operators that will no longer have to be funded by the taxpayer once all franchised services are back in public ownership.","themes":["Cost & funding","Delivery & schedule","Workforce & capability","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 2024/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating for 2025/26 Q4 has remained at Amber. Good progress continues to be made with South Western Railway, c2c, Greater Anglia and West Midlands Trains successfully transferred into public ownership. Work is progressing well on the Govia Thameslink Railway transfer…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"DFT_0439_2425-Q3","year":2025,"name":"PUBLIC OWNERSHIP TRANSITION PROGRAMME","department":"DfT","category":"Government Transformation and Service Delivery","description":"The Programme will transfer into public ownership the remaining privately operated passenger rail contracts that are the responsibility of the Secretary of State. These will be transferred to DfT Operator Limited – previously known as DfT Operator of Last Resort Holdings Limited (DOHL) – whose functions will eventually be integrated into Great British Railways (GBR). The aim is to complete all transfers into public ownership by the end of 2027.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER. This is due to‚ The programme agreed with the IPA/NISTA IQA of Amber and has commenced implementing the recommendations contained in the report.","startDate":null,"endDate":"2027-12-31","scheduleNarrative":"The project's end-date at 24/25-Q4 is scheduled to be 31/12/2027. This is primarily due to the following factors‚ On 4 December 2024, the government launched the rail public ownership programme and announced the first services to transfer into public ownership following Royal Assent of the Passenger Railway Services (Public Ownership) Bill. South Western Railway’s services were the first to transfer on 25 May 2025 followed by c2c’s services on 20 July 2025. Greater Anglia’s services will then transfer on 12 October 2025. Following the transfer of Greater Anglia’s services, DfT expects the programme will continue with one operator’s services transferring roughly every 3 months. The transfer of passenger services operated under contracts with DfT is expected to complete by the end of 2027.","fyBaseline":3.9,"fyForecast":5.5,"fyVariance":41.03,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The programme registered an underspend in the 2024/25 financial year, in part as a result of not needing to activate additional legal support which was build into the baseline.","wholeLifeCost":36.6,"costNarrative":"The project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) is 36. This is primarily due to the following factors‚","benefits":0.0,"benefitsNarrative":"The project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) is 0. This is primarily due to the following factors‚ The Public Ownership Programme serves as an enabler for wider rail reform benefits. Where there are monetised benefits that the programme is specifically responsible for, these will be identified and monitored.","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER. This is due to‚ The programme agreed with the IPA/NISTA IQA of Amber and has commenced implementing the recommendations contained in the report. The project's end-date at 24/25-Q4 is scheduled to be 31/12/2027. This is primarily due to the following factors‚…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"DFT_0439_2425-Q3","year":2026,"name":"PUBLIC OWNERSHIP TRANSITION PROGRAMME","department":"DFT","category":"Government Transformation and Service Delivery","description":"The Programme will transfer the remaining privately operated passenger rail contracts, for which the Secretary of State is responsible, into public ownership. These will be transferred to DfT Operator Limited (DFTO) whose functions will eventually be integrated into Great British Railways (GBR). The aim is to complete all transfers into public ownership by the end of 2027. Richard Goodman served as interim SRO from 24 December 2025 to 31 March 2026 during the programme’s transfer from DfT to DFTO. Alex Hynes assumed SRO responsibilities from 1 April 2026.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 2024/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating for 2025/26 Q4 has remained at Amber. Good progress continues to be made with South Western Railway, c2c, Greater Anglia and West Midlands Trains successfully transferred into public ownership. Work is progressing well on the Govia Thameslink Railway transfer scheduled for 31 May 2026, with further transfers scheduled (including Chiltern Railways on 20 September 2026 and Great Western Railway on 13 December 2026). This indicates that the Programme has a good chance of successful completion, although larger, more complex transfers remain.","startDate":"2024-12-04","endDate":"2027-12-31","scheduleNarrative":"The programme is progressing on time and as planned; the services of South Western Railway, c2c, Greater Anglia and West Midlands have successfully transferred into public ownership. The SoS has also issued expiry notices confirming the planned transfer of Govia Thameslink Railway (GTR) services on 31 May 2026, Chiltern services on 20 September 2026 and Great Western Railway services on 13 December 2026. Work on the GTR transfer is well advanced with work on Chiltern now progressing to plan. Decisions regarding the timing of the final three transfers will be made by the SoS later with the full programme of transitions into public ownership expected to be completed by the end of 2027. Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remains the same. There is a risk that a Train Operating Company may default, which could necessitate unplanned transfers and exacerbate capacity and capability pressures across the department and DFTO. While the likelihood of default is considered low and the risk is regarded as manageable, the programme continues to plan for this. The transfer of DFT Rail Services Group staff to DFTO took place at the end of March 2026.","fyBaseline":9.77,"fyForecast":10.73,"fyVariance":9.81,"varianceNarrative":"The budget variance exceeds 5% due to the delivery of the scheduled volume of work for the 2025/26 financial year, in order to meet the programme’s public commitments and ensure the transfers are delivered safely and effectively.","wholeLifeCost":36.6,"costNarrative":"Compared to Q4 of the 2024/25 financial year, the project’s departmentally agreed Whole Life Cost at Q4 of 2025/26 (measured in £m) has remained the same.","benefits":110.0,"benefitsNarrative":"Under public ownership, passenger services will be operated in the interests of passengers rather than shareholders. This represents a vital step towards wider reform, bringing track and train together under Great British Railways (GBR). Public ownership will save taxpayers up to an estimated £110-150 million every year on fees paid to privately-owned train operating companies, once all services currently delivered under contract with the Department have transferred. The Government is taking the railways into public ownership at the lowest reasonable cost to the taxpayer, enabling long-overdue improvements to make everyday journeys easier. Each transfer will involve some mobilisation and due diligence costs. These costs are expected to be a small fraction of the £110-150m per year in fees to private operators that will no longer have to be funded by the taxpayer once all franchised services are back in public ownership.","themes":["Cost & funding","Delivery & schedule","Workforce & capability","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 2024/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating for 2025/26 Q4 has remained at Amber. Good progress continues to be made with South Western Railway, c2c, Greater Anglia and West Midlands Trains successfully transferred into public ownership. Work is progressing well on the Govia Thameslink Railway transfer…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"DFT_0439_2425-Q3","year":2025,"name":"PUBLIC OWNERSHIP TRANSITION PROGRAMME","department":"DfT","category":"Government Transformation and Service Delivery","description":"The Programme will transfer into public ownership the remaining privately operated passenger rail contracts that are the responsibility of the Secretary of State. These will be transferred to DfT Operator Limited – previously known as DfT Operator of Last Resort Holdings Limited (DOHL) – whose functions will eventually be integrated into Great British Railways (GBR). The aim is to complete all transfers into public ownership by the end of 2027.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER. This is due to‚ The programme agreed with the IPA/NISTA IQA of Amber and has commenced implementing the recommendations contained in the report.","startDate":null,"endDate":"2027-12-31","scheduleNarrative":"The project's end-date at 24/25-Q4 is scheduled to be 31/12/2027. This is primarily due to the following factors‚ On 4 December 2024, the government launched the rail public ownership programme and announced the first services to transfer into public ownership following Royal Assent of the Passenger Railway Services (Public Ownership) Bill. South Western Railway’s services were the first to transfer on 25 May 2025 followed by c2c’s services on 20 July 2025. Greater Anglia’s services will then transfer on 12 October 2025. Following the transfer of Greater Anglia’s services, DfT expects the programme will continue with one operator’s services transferring roughly every 3 months. The transfer of passenger services operated under contracts with DfT is expected to complete by the end of 2027.","fyBaseline":3.9,"fyForecast":5.5,"fyVariance":41.03,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The programme registered an underspend in the 2024/25 financial year, in part as a result of not needing to activate additional legal support which was build into the baseline.","wholeLifeCost":36.6,"costNarrative":"The project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) is 36. This is primarily due to the following factors‚","benefits":0.0,"benefitsNarrative":"The project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) is 0. This is primarily due to the following factors‚ The Public Ownership Programme serves as an enabler for wider rail reform benefits. Where there are monetised benefits that the programme is specifically responsible for, these will be identified and monitored.","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER. This is due to‚ The programme agreed with the IPA/NISTA IQA of Amber and has commenced implementing the recommendations contained in the report. The project's end-date at 24/25-Q4 is scheduled to be 31/12/2027. This is primarily due to the following factors‚…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":0,"attentionScore":21,"attentionReasons":["Current published delivery confidence is Amber","In-year forecast variance is +9.8%"]},{"id":"BEIS_0013_2021-Q4","year":2026,"name":"PUBLIC SECTOR DECARBONISATION SCHEME","department":"DESNZ","category":"Infrastructure and Construction","description":"The Public Sector Decarbonisation Scheme has been in operation since September 2020, providing capital grant funding to support heat decarbonisation and energy efficiency improvements in public sector buildings. Its core aim is to reduce direct carbon emissions from the public sector. These reductions will contribute to the UK’s Carbon Budgets 4, 5, and 6, playing a vital role in achieving the UKs Net Zero targets.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Overall delivery of live projects is progressing well. Although grant recipients continue to experience pressures from, for example, higher-than-expected costs and longer than anticipated timelines for delivery, projects are delivering at above our previously assumed level. As a result, delivery outcomes are looking promising. Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment rating at 25/26 Q4 remained at AMBER.","startDate":"2020-07-08","endDate":"2028-03-31","scheduleNarrative":"The project is due to conclude on 31 March 2028, in line with the latest approved Business Case. In 2025, Ministers took the decision not to support further investment in PSDS, and no additional funding will be allocated.","fyBaseline":405.44,"fyForecast":436.74,"fyVariance":7.72,"varianceNarrative":"Project delivery losses in FY 2025/26 were lower than modelled, with attrition from abandonments and rescopes below overprogramming assumptions, resulting in a c. 7% CDEL overspend.","wholeLifeCost":3759.0,"costNarrative":"In June 2025, the PSDS budget was reduced as part of Phase 2 of the 2025 Spending Review, with impacts on funding in FY 2026/27 and 2027/28.","benefits":5893.84,"benefitsNarrative":"Modelled baseline benefits were revised to account for the reduction of budget in FY 2026/27 and 2027/28.","themes":["Delivery & schedule","Cost & funding","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Overall delivery of live projects is progressing well. Although grant recipients continue to experience pressures from, for example, higher-than-expected costs and longer than anticipated timelines for delivery, projects are delivering at above our previously assumed level. As a result, delivery outcomes are looking promising. Compared to financial year…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"BEIS_0013_2021-Q4","year":2021,"name":"Public Sector Decarbonisation Scheme (PSDS)","department":"BEIS","category":"Infrastructure and Construction","description":"The Public Sector Decarbonisation Scheme (PSDS) provides grants for public sector bodies to fund heat decarbonisation and energy efficiency measures.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber.This is primarily due to the following factors: Initial monitoring data suggest that Phase 1 of the Public Sector Decarbonisation Scheme has exceeded its carbon emission reduction objective. There was very strong demand for Phase 1 and expected to be very strong demand for Phase 2 of the Scheme. I will continue to closely monitor the implementation of both Phases. The main risk to delivery is the uncertain impact of the ongoing COVID pandemic.","startDate":"2020-07-08","endDate":"2022-03-31","scheduleNarrative":"The project end-date is 31 March 2022. This is primarily due to the following factors: The project is due to end by 31 March 2022, in line with its budget allocation from the latest Spending Review.","fyBaseline":641.14,"fyForecast":630.36,"fyVariance":-2.0,"varianceNarrative":"The budget variance is less than or equal to 5%. N/A - budget variance is inferior or equal to 5%","wholeLifeCost":1116.14,"costNarrative":"The projects Baseline Whole Life Cost is �1116.14m. This is primarily due to the following factors: The large majority of the Baseline Whole Life Cost consists of grant funding for public sector organisations.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber.This is primarily due to the following factors: Initial monitoring data suggest that Phase 1 of the Public Sector Decarbonisation Scheme has exceeded its carbon emission reduction objective. There was very strong demand for Phase 1 and expected to be very strong demand for…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21"},{"id":"BEIS_0013_2021-Q4","year":2022,"name":"Public Sector Decarbonisation Scheme (PSDS)","department":"BEIS","category":"Infrastructure and Construction","description":"A capital funding programme for heat decarbonisation and energy efficiency improvements in public sector organisations. The PSDS has received funding for three phases. Phase 1 consists of £1bn of funding to be delivered over 2020/21 and 2021/22. Phase 2 consists of £75m of funding to be delivered over the 2021/22 financial year. Phase 3 consists of £1.425 billion funding to be delivered over three years between 2022/23 and 2024/25.Funding for further phases of the Scheme will be determined through the Spending Review process. Funding for Phases 1 and 2 of the Scheme ended on 31 March 2022.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 remained at Amber £1.075 billion has been allocated for Phases 1 and 2 of the Scheme. No further funding will be allocated through these phases. Funding for Phase 3 of the Scheme has been confirmed through the 2021 Spending Review. Close to the full budget for the first year of Phase 3 has been allocated, to allow grant recipients to start drawing down funding from April 2022. Delivery confidence remains at amber due to the impact of the Covid-19 pandemic on Phase 1 and 2 projects.","startDate":"2020-07-08","endDate":"2025-03-31","scheduleNarrative":"Compared to 2021-Q4, your project end-date increased from 31 MAR 2022 to 31 MAR 2025 . This is primarily due to the following factors: The Scheme has 3 phases that are currently in delivery. We take a hybrid approach to project planning, leaning mostly on waterfall methodology but incorporating insights from previous phases into subsequent phases, iterating with stakeholders and others through the scheme design process. All three phases of the scheme are delivered through Salix Finance - public sector organisations apply to Salix for grant funding to complete heat decarbonisation and energy efficiency projects, Salix then assesses these bids, issues grant offer letters to successful applicants, monitors the delivery of the resulting portfolio of grant-funded projects, and issues grant payments.","fyBaseline":503.89,"fyForecast":503.89,"fyVariance":0.0,"varianceNarrative":"The budget variance is inferior or equal to 5%. The CDEL baseline costs are based on the confirmed budgets for the PSDS. The CDEL budget is £600m in 2020/21 and £475m in each of 2021/22, 2022/23, 2023/23 and 2024/25. The budget for future phases of the Scheme will be determined through the Spending Review process. The 2020/21 and 2021/22 RDEL budget included funding for the Public Sector Low Carbon Skills Fund (LCSF), funding for Salix Finance Ltd to deliver the PSDS and other programme costs (eg for evaluation contractor). The RDEL figure for 21/22 forecast is 23.77","wholeLifeCost":2570.0,"costNarrative":"Compared to2021-Q4, the projects Baseline Whole Life Cost increased from 1116.14 (£m) to 2570.03 (£m). This is primarily due to the following factors: £1.425 billion of funding for Phase 3 of the PSDS was allocated via the Autumn Budget and Spending Review 2021. This will provide £475 million of funding for three financial years from 2022/23 to 2024/25.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 remained at Amber £1.075 billion has been allocated for Phases 1 and 2 of the Scheme. No further funding will be allocated through these phases. Funding for Phase 3 of the Scheme has been confirmed through the 2021 Spending Review.…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"BEIS_0013_2021-Q4","year":2023,"name":"Public Sector Decarbonisation Scheme (PSDS)","department":"DESNZ","category":"Infrastructure and Construction","description":"A capital funding programme for heat decarbonisation and energy efficiency improvements in public sector organisations. The PSDS has received funding for three phases. Phase 1 consisted of 1bn of funding which was delivered over 2020/21 and 2021/22. Phase 2 consisted of 75m of funding which was delivered over the 2021/22 financial year. Phase 3 consists of 1.425 billion funding to be delivered over three years between 2022/23 and 2024/25. Funding for further phases of the Scheme will be determined through the Spending Review process. Funding for Phases 1 and 2 of the Scheme ended on 31 March 2022.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. SRO DCA remains Amber. Although the key milestones for year 1 of PSDS Phase 3 has been successfully delivered, the outcome for year 1 in terms of spend and technology deployed remains uncertain. We know that projects are experiencing headwinds from higher than expected costs and tight supply chains linked to wider market responses to the ongoing energy situation.","startDate":"2020-07-08","endDate":"2025-03-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2025-03-31. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2025-03-31. This is primarily due to the following factors. The project is due to conclude on 31/03/2025 in line with available funding secured as part of the Autumn budget and 2021 spending review. The project end date may shift as funding for further phases of the scheme are determined through the next spending review process.","fyBaseline":504.23,"fyForecast":504.23,"fyVariance":0.0,"varianceNarrative":"The budget variance is inferior or equal to 5%. The forecast budget variance is less than or equal to 5% though underspend arising from late project abandonment and scope changes tends to emerge very late in the year so risks remain that this will increase once full year data is available","wholeLifeCost":2598.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 increased from 2570m. to 2598m. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 increased from 2570m. to 2598m. This is primarily due to the following factors. The Whole Life Costs increased due to the addition of resource departmental expenditure limit figures for FY 2022/23 following confirmation of budget allocation.","benefits":5324.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 5324m. The scheme benefits are monetised as far as possible. The monetised benefits are i) reductions in carbon emissions as a result of changes to fuel consumption, ii) air quality improvements through decreased burning of fossil fuels, and iii) changes to energy consumption. The benefits are monetised using the most recent available Green Book Assumptions.The benefits associated with the scheme continue beyond delivery as projects delivered under the PSDS result in continued carbon emission reductions.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. SRO DCA remains Amber. Although the key milestones for year 1 of PSDS Phase 3 has been successfully delivered, the outcome for year 1 in terms of spend and technology…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"BEIS_0013_2021-Q4","year":2024,"name":"Public Sector Decarbonisation Scheme (PSDS)","department":"DESNZ","category":"Infrastructure and Construction","description":"The Public Sector Decarbonisation Scheme has been running since September 2020. It provides capital funding for heat decarbonisation and energy efficiency projects in public sector buildings in England. The PSDS's primary objective is to reduce direct carbon emissions from the public sector. These non-traded emissions savings will contribute to Carbon Budgets 4, 5 and 6, and will help the UK meet its Net Zero targets. Funding for phases 1 and 2 of the scheme ended on 31 March 2022. Phase 3 is currently in delivery and funding for Phase 4 has been secured following the government's announcement of 6bn for energy efficiency policies making available funding for public sector decarbonisation for 25/26 to 27/28. Phase 4 is subject to business case approval.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. Although the key milestones for year 1 and 2 of PSDS Phase 3 have been successfully delivered, the outcome in terms of spend and technology deployed remains uncertain. We know that projects are experiencing headwinds from higher than expected costs due to inflation.","startDate":"2020-07-08","endDate":"2025-03-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2025-03-31. This is primarily due to the following factors. The project is due to conclude on 31/03/2025 in line with our latest approved business case. The project end date will shift by a year (to March 2026) when we receive approval via the business case process for the next Phase of the scheme.","fyBaseline":461.04,"fyForecast":461.04,"fyVariance":0.0,"varianceNarrative":"The budget variance is inferior or equal to 5%.","wholeLifeCost":2565.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 decreased from 2598m. to 2565m. This is primarily due to the following factors. The Whole Life Costs decreased due to readjustment of baseline following PSDS budget reductions and departmental budget transfers.","benefits":5076.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 2324-Q4 decreased from 5324m. to 5076m. The scheme benefits are monetised as far as possible. The monetised benefits are i) reductions in carbon emissions as a result of changes to fuel consumption, ii) air quality improvements through decreased burning of fossil fuels, and iii) changes to energy consumption. The benefits are monetised using the most recent available Green Book Assumptions. The benefits associated with the scheme continue beyond delivery as projects delivered under the PSDS result in continued carbon emission reductions.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. Although the key milestones for year 1 and 2 of PSDS Phase 3 have been successfully delivered, the outcome in terms of spend and technology deployed remains…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"BEIS_0013_2021-Q4","year":2025,"name":"PUBLIC SECTOR DECARBONISATION SCHEME","department":"DESNZ","category":"Infrastructure and Construction","description":"The Public Sector Decarbonisation Scheme has been in operation since September 2020, providing capital funding to support heat decarbonisation and energy efficiency improvements in public sector buildings. Its core aim is to reduce direct carbon emissions from the public sector. These reductions will contribute to the UK’s Carbon Budgets 4, 5, and 6, playing a vital role in achieving the UKs Net Zero targets.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors: while overall delivery of live projects is progressing well, grant recipients continue to experience pressures from, for instance, higher-than-expected costs and longer than anticipated timelines for delivery implementation. As a result, the outcomes regarding technologies deployed remain uncertain.","startDate":"2020-07-08","endDate":"2028-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2025 to 31/03/2028. This is primarily due to the following factors: the Phase 4 Full Business Case, covering delivery through to FY 2027/28, was approved and at Autumn Budget 2024 additional funding was secured for financial years 2025/26 to 2027/28. Phase 4 of the scheme was launched in Autumn 2024 with grant recipients able to commence grant spend from 1 April 2025.","fyBaseline":433.8,"fyForecast":404.9,"fyVariance":6.66,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors: higher-than-expected project delivery losses were experienced in financial year 2024/25, driven by an increase in project scope reductions and abandonments as a result of various delivery challenges. This resulted in an underspend that exceeded the amount by which we had overprogrammed, giving rise to unclaimed budget.","wholeLifeCost":3836.29,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 2565 to 3836. This is primarily due to the following factors: funding for the second year of Phase 3c, and Phase 4, of the Public Sector Decarbonisation Scheme was secured and included in the return. This funding will support delivery across financial years 2025/26 to 2027/28.","benefits":8040.01,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 5076 to 8040. This is primarily due to the following factors: modelled baseline benefits were revised to account for inclusion of funding for the second year of Phase 3c, and Phase 4, in the return.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors: while overall delivery of live projects is progressing well, grant recipients continue to experience pressures from, for instance, higher-than-expected costs and…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"BEIS_0013_2021-Q4","year":2026,"name":"PUBLIC SECTOR DECARBONISATION SCHEME","department":"DESNZ","category":"Infrastructure and Construction","description":"The Public Sector Decarbonisation Scheme has been in operation since September 2020, providing capital grant funding to support heat decarbonisation and energy efficiency improvements in public sector buildings. Its core aim is to reduce direct carbon emissions from the public sector. These reductions will contribute to the UK’s Carbon Budgets 4, 5, and 6, playing a vital role in achieving the UKs Net Zero targets.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Overall delivery of live projects is progressing well. Although grant recipients continue to experience pressures from, for example, higher-than-expected costs and longer than anticipated timelines for delivery, projects are delivering at above our previously assumed level. As a result, delivery outcomes are looking promising. Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment rating at 25/26 Q4 remained at AMBER.","startDate":"2020-07-08","endDate":"2028-03-31","scheduleNarrative":"The project is due to conclude on 31 March 2028, in line with the latest approved Business Case. In 2025, Ministers took the decision not to support further investment in PSDS, and no additional funding will be allocated.","fyBaseline":405.44,"fyForecast":436.74,"fyVariance":7.72,"varianceNarrative":"Project delivery losses in FY 2025/26 were lower than modelled, with attrition from abandonments and rescopes below overprogramming assumptions, resulting in a c. 7% CDEL overspend.","wholeLifeCost":3759.0,"costNarrative":"In June 2025, the PSDS budget was reduced as part of Phase 2 of the 2025 Spending Review, with impacts on funding in FY 2026/27 and 2027/28.","benefits":5893.84,"benefitsNarrative":"Modelled baseline benefits were revised to account for the reduction of budget in FY 2026/27 and 2027/28.","themes":["Delivery & schedule","Cost & funding","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Overall delivery of live projects is progressing well. Although grant recipients continue to experience pressures from, for example, higher-than-expected costs and longer than anticipated timelines for delivery, projects are delivering at above our previously assumed level. As a result, delivery outcomes are looking promising. Compared to financial year…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"BEIS_0013_2021-Q4","year":2025,"name":"PUBLIC SECTOR DECARBONISATION SCHEME","department":"DESNZ","category":"Infrastructure and Construction","description":"The Public Sector Decarbonisation Scheme has been in operation since September 2020, providing capital funding to support heat decarbonisation and energy efficiency improvements in public sector buildings. Its core aim is to reduce direct carbon emissions from the public sector. These reductions will contribute to the UK’s Carbon Budgets 4, 5, and 6, playing a vital role in achieving the UKs Net Zero targets.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors: while overall delivery of live projects is progressing well, grant recipients continue to experience pressures from, for instance, higher-than-expected costs and longer than anticipated timelines for delivery implementation. As a result, the outcomes regarding technologies deployed remain uncertain.","startDate":"2020-07-08","endDate":"2028-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2025 to 31/03/2028. This is primarily due to the following factors: the Phase 4 Full Business Case, covering delivery through to FY 2027/28, was approved and at Autumn Budget 2024 additional funding was secured for financial years 2025/26 to 2027/28. Phase 4 of the scheme was launched in Autumn 2024 with grant recipients able to commence grant spend from 1 April 2025.","fyBaseline":433.8,"fyForecast":404.9,"fyVariance":6.66,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors: higher-than-expected project delivery losses were experienced in financial year 2024/25, driven by an increase in project scope reductions and abandonments as a result of various delivery challenges. This resulted in an underspend that exceeded the amount by which we had overprogrammed, giving rise to unclaimed budget.","wholeLifeCost":3836.29,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 2565 to 3836. This is primarily due to the following factors: funding for the second year of Phase 3c, and Phase 4, of the Public Sector Decarbonisation Scheme was secured and included in the return. This funding will support delivery across financial years 2025/26 to 2027/28.","benefits":8040.01,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 5076 to 8040. This is primarily due to the following factors: modelled baseline benefits were revised to account for inclusion of funding for the second year of Phase 3c, and Phase 4, in the return.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors: while overall delivery of live projects is progressing well, grant recipients continue to experience pressures from, for instance, higher-than-expected costs and…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":0,"attentionScore":21,"attentionReasons":["Current published delivery confidence is Amber","In-year forecast variance is +7.7%"]},{"id":"DFE_0496_2526-Q1","year":2026,"name":"School-based nurseries","department":"DFE","category":"Infrastructure and Construction","description":"The school-based nurseries programme was established in August 2024 and is already delivering on our commitment to create tens of thousands of places in school-based nurseries, helping more families access funded childcare and giving children the best start in life. The programme is already delivering 300 new or expanded SBNs through phase 1 of the programme, providing funding directly to schools (£37m CDEL). The programme has secured funding (£367m CDEL) at the Spending Review to continue the programme in further phases. Phase 2 is also providing funding directly to 331 schools to open new or expanded SBNs during academic year 2026-27. In phase 3 local authorities will be invited to develop multi-year funding proposals to deliver SBNs between 2027-30, with places available from September 2027.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The programme’s Confidence Assessment is Amber. The programme has made strong progress this year, with the successful launch of Phase 1 with it's £37m of funding, delivering over two thirds of it's 300 projects and being on track for all Phase 1 projects to have delivered by March 2027 as planned. Phase 2 has also successfully completed announcement, assessment, moderation and launch ahead of the Easter holidays, with £45m awarded to 331 schools. Phase 3 guidance has been published and early feedback has been mostly positive, with strong Local Authority engagement through recent webinars. The pace and scale of delivery remains challenging, and we will continue to deliver against a backdrop of uncertainty on the number and scale of Phase 3 projects until late in 2026.","startDate":"2024-08-01","endDate":"2029-09-28","scheduleNarrative":"The programme's end date is 28/09/2029. This is primarily due to the following factors, the programme comprises multiple delivery phases through a mix of delivery models, with projects able to open until September 2029.","fyBaseline":35.84,"fyForecast":32.55,"fyVariance":9.19,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the first phase being a test and learn phase, and delays to the completion of some projects. This has resulted in a small underspend in 2026-27 against original forecast, though we do not anticipate the overall amount of funding we will spend in phase 1 to differ greatly from the agreed cost baseline.","wholeLifeCost":369.85,"costNarrative":"Whole life costs have been developed based on committed spending thus far through agreement at spending review.","benefits":199.33,"benefitsNarrative":"The monetised benefits for the programme has an estimate value over 60 years and are based on the positive impacts on attainment Early Years provision has at KS4 (quantified in terms of increased lifetime earnings) by creating additional nursery settings and place. The programme includes a range of non-monetised benefits, including more children from disadvantaged areas and those with special educational needs and disabilities (SEND) accessing early education, contributing to improved school readiness and early development outcomes. Parents who access and use the nursery may be able to enter the workforce, increase their part time-hours or have increased free time. The programme has taken a test and learn approach, to ensure that at each stage of expanded delivery, we have been able to deliver more efficiently and effectively, refining our approach throughout. The lessons we have learned in doing this continue to be shared with other programmes within the department to enhance outcomes.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"The programme’s Confidence Assessment is Amber. The programme has made strong progress this year, with the successful launch of Phase 1 with it's £37m of funding, delivering over two thirds of it's 300 projects and being on track for all Phase 1 projects to have delivered by March 2027 as planned. Phase 2 has also successfully completed announcement,…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"DFE_0496_2526-Q1","year":2026,"name":"School-based nurseries","department":"DFE","category":"Infrastructure and Construction","description":"The school-based nurseries programme was established in August 2024 and is already delivering on our commitment to create tens of thousands of places in school-based nurseries, helping more families access funded childcare and giving children the best start in life. The programme is already delivering 300 new or expanded SBNs through phase 1 of the programme, providing funding directly to schools (£37m CDEL). The programme has secured funding (£367m CDEL) at the Spending Review to continue the programme in further phases. Phase 2 is also providing funding directly to 331 schools to open new or expanded SBNs during academic year 2026-27. In phase 3 local authorities will be invited to develop multi-year funding proposals to deliver SBNs between 2027-30, with places available from September 2027.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The programme’s Confidence Assessment is Amber. The programme has made strong progress this year, with the successful launch of Phase 1 with it's £37m of funding, delivering over two thirds of it's 300 projects and being on track for all Phase 1 projects to have delivered by March 2027 as planned. Phase 2 has also successfully completed announcement, assessment, moderation and launch ahead of the Easter holidays, with £45m awarded to 331 schools. Phase 3 guidance has been published and early feedback has been mostly positive, with strong Local Authority engagement through recent webinars. The pace and scale of delivery remains challenging, and we will continue to deliver against a backdrop of uncertainty on the number and scale of Phase 3 projects until late in 2026.","startDate":"2024-08-01","endDate":"2029-09-28","scheduleNarrative":"The programme's end date is 28/09/2029. This is primarily due to the following factors, the programme comprises multiple delivery phases through a mix of delivery models, with projects able to open until September 2029.","fyBaseline":35.84,"fyForecast":32.55,"fyVariance":9.19,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the first phase being a test and learn phase, and delays to the completion of some projects. This has resulted in a small underspend in 2026-27 against original forecast, though we do not anticipate the overall amount of funding we will spend in phase 1 to differ greatly from the agreed cost baseline.","wholeLifeCost":369.85,"costNarrative":"Whole life costs have been developed based on committed spending thus far through agreement at spending review.","benefits":199.33,"benefitsNarrative":"The monetised benefits for the programme has an estimate value over 60 years and are based on the positive impacts on attainment Early Years provision has at KS4 (quantified in terms of increased lifetime earnings) by creating additional nursery settings and place. The programme includes a range of non-monetised benefits, including more children from disadvantaged areas and those with special educational needs and disabilities (SEND) accessing early education, contributing to improved school readiness and early development outcomes. Parents who access and use the nursery may be able to enter the workforce, increase their part time-hours or have increased free time. The programme has taken a test and learn approach, to ensure that at each stage of expanded delivery, we have been able to deliver more efficiently and effectively, refining our approach throughout. The lessons we have learned in doing this continue to be shared with other programmes within the department to enhance outcomes.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"The programme’s Confidence Assessment is Amber. The programme has made strong progress this year, with the successful launch of Phase 1 with it's £37m of funding, delivering over two thirds of it's 300 projects and being on track for all Phase 1 projects to have delivered by March 2027 as planned. Phase 2 has also successfully completed announcement,…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":null,"ratingDelta":null,"transition":"Not comparable","endDateDeltaDays":null,"attentionScore":21,"attentionReasons":["Current published delivery confidence is Amber","In-year forecast variance is +9.2%"]},{"id":"MOD_0118_1718-Q3","year":2026,"name":"CLYDE INFRASTRUCTURE","department":"MOD","category":"Military Capability","description":"The HMNB Clyde Infrastructure Programme (CIP) has been established to manage the design, delivery and transition into operational use, new build and updated infrastructure facilities at HMNB Clyde. In order to: enable the continued safe and secure operation of submarines; support the arrival of the next generation Dreadnought SSBNs; and create a single submarine centre of specialisation. With an estimated budget of £3.3Bn, it is a programme of strategic national importance that is critical to sustaining Continuous At Sea Deterrence, and the safe, sustainable and cost effective operation of the Submarine Force. The end state of the programme will be “An integrated submarine operating base at Clyde, supporting a Submarine Force that is safe, secure, sustainable and resilient, and ready to excel in operations out to 2067.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors. 1. The Delivery Confidence Assessment reflects successful completion of nine projects by the programme team up to 2025/26. 2. Despite recent successes, our resource position remains a risk. We continue to face challenges in recruiting sufficient staff and securing the level of industry support required to sustain delivery. Resourcing needs will have to be proactively managed to ensure we can maintain momentum and meet our commitments.","startDate":"2015-09-07","endDate":"2032-04-01","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme end-date at 25/26-Q4 remained the same at 01/04/2032.","fyBaseline":255.06,"fyForecast":236.11,"fyVariance":7.43,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. 1. The main driver for the 7% in-year variance is the need for the programme to work within the operational areas of HMNB Clyde and forecast sufficient flexibility to maintain capital works around operational priorities. 2. During 25/26 operational plans have affected the ability to deliver the original planned spend.","wholeLifeCost":3324.98,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally-agreed Whole Life Cost at 25/26-Q4 (measured in £m) increased from £1876.3M to £3287.2M. This is primarily due to the following factors. 1. The forecast Whole Life Costs has increased to reflect new requirements and improved understanding of the conditions of the existing infrastructures and the levels of intervention required to achieve the required programme outcomes.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Delivery & schedule","Workforce & capability","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors. 1. The Delivery Confidence Assessment reflects successful completion of nine projects by the programme team up to 2025/26. 2. Despite recent successes, our resource position remains a…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"MOD_0118_1718-Q3","year":2020,"name":"Clyde Infrastructure","department":"MOD","category":"Military Capability","description":"Managing the design, delivery and transition into operational use, new build and updated infrastructure facilities in HMNB Clyde (Faslane and Coulport).","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber, which has declined since last year�s Q2 1819 Amber/Green, due primarily to the following factors; - The phased transition from predominantly new build scope to a greater focus on refurbishment work of existing facilities within the operational areas of the base requiring greater integration and planning across the stakeholder community, particularly across boat maintenance and weapons programmes. - A greater understanding of existing asset condition has highlighted the fragility of some aspects of the key complex technical waterfront infrastructure which together with greater operational demands on facilities has lead to uncertainty on the volume of intervention required and the ability to deliver within programme time and cost parameters. Since the Q2 1920 (30th September 2019) Amber IPA DCA, the following non-project operating environment activities have impacted the original Q2 IPA DCA; - The impact of COVID19 on the delivery of the programme is currently being assessed, noting that all non critical onsite projects ceased on 24th March 20 to moderate viral transmission and mitigate the risk to CASD. - The successful completion of the Nuclear Technical Support Provider Framework procurement has been achieved, leading to greater access to a wider pool of nuclear qualified supply chain resource to support the large number of concurrent projects across the programme. Since the Q2 1920 (30th September 2019) Amber IPA DCA, the following primary project actions have impacted the original Q2 IPA DCA; - The introduction of Joint Project teams which include representatives from all key stakeholder groups associated with complex project delivery is leading to a more inclusive culture, better communication and transparency resulting in greater efficiency and more effective ways of working. - The introduction of a Steering board for Coulport Projects with broad representation has led to more effective prioritisation and planning of work in key operational areas to address capability risks within the operational delivery programme.","startDate":"2015-09-07","endDate":"2032-03-30","scheduleNarrative":"The scheduled project end date at Q2 1920 (30th September 2019) is 30/03/32, due primarily to the following factors; - 2032 is the end date agreed when the programme was rebalanced during 2017, based on the forecast completion date of all projects within the programme. This date remains extant at this time. - The primary drivers for the completion date of the projects include the DREADNOUGHT Class in service date and achieving the endorsed ambition of a Single Integrated Operating Base. The volume of concurrent activity that can be commissioned simultaneously across the site is limited by the need to maintain operations and deconflict activity in a geographically constrained highly secure environment. Since the Q2 1920 (30th September 2019) baseline project end date of 30/03/32, the following primary project actions have impacted the original Q2 baseline project end date; - The long term impact of COVID19 on specific projects and the available industrial base is being assessed to understand the impact on the programme completion date. - Analysis of the volume of work required to remediate key facilities across the Programme, may require some re-prioritisation of the work against the original 2017 baseline. A Capability Audit has been commissioned to review the Portfolio Definition which could impact on the programme completion date.","fyBaseline":112.7,"fyForecast":117.7,"fyVariance":4.0,"varianceNarrative":"Budget variance less than 5%","wholeLifeCost":1774.57,"costNarrative":"The baseline Whole Life Cost at Q2 1920 (30th September 2019) is �1,774.57 m, has increased by �2.95 m since last year's Q2 1819 (�m) baseline Whole Life Cost of �1,771.62 m, due primarily to the following factors; - Maturing information across the programme in relation to asset condition. - Maturing information across the programme in development of estimated costs. Since the Q2 1920 (30th September 2019) �1,774.57 m baseline Whole Life Cost, the following non-project operating environment activities have impacted the original baseline Q2 Whole Life Cost; - Working restrictions due to COVID19, impact under assessment. Since the Q2 1920 (30th September 2019) �1,774.57 m baseline Whole Life Cost, the following primary project actions have impacted the original Q2 baseline Whole Life Cost; - Although the baseline costs have not moved materially, the forward profile for the programme will need to be adjusted to reflect the pace at which work can be delivered across the site given the operational exigencies that limit / constrain interventions to time bound windows of opportunity. - A Capability Audit is underway and will likely see some changes to project prioritisation which could have some impact on the long term financial profile.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Workforce & capability","Technical & integration"],"evidenceExcerpt":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber, which has declined since last year�s Q2 1819 Amber/Green, due primarily to the following factors; - The phased transition from predominantly new build scope to a greater focus on refurbishment work of existing facilities within the operational areas of the base…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2020","sourceLabel":"IPA Annual Report 2019-20"},{"id":"MOD_0118_1718-Q3","year":2021,"name":"Clyde Infrastructure","department":"MOD","category":"Military Capability","description":"The Clyde Infrstructure Programme is managing the design, delivery and transition into operational use of new build and updated infrastructure facilities in Her Majesty's Naval Base Clyde (Faslane and Coulport).","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber. This is primarily due to the following factors: Following overspend in some early projects, the programme was re-baselined to remain affordable. All changes were endorsed by the Clyde Infrastructure Programme Sponsor Board and briefed to the Ministry of Defence�Major Programmes Portfolio Sponsor Group. The programme is pivoting its delivery model and approach from 'new build' to 're-capitalisation' while minimising site operating risk. This requires�all aspects of the programme to integrate with the wider site operations. A new operating model was adopted to support this. Good progress was made in period against the challenges identified in internal reports and the November 2019 Infrastructure and Projects Authority Gateway Assurance Review. A further Gateway Assurance Review will be carried out in September 2021. Overall the Delivery Confidence Assessment remains Amber and will remain so until the revised operating model and associated behaviours are embedded within both the Programme delivery and Site operating teams.","startDate":"2015-09-07","endDate":"2032-03-30","scheduleNarrative":"Compared to financial year 19/20-Q2, the project's end-date decreased from 01 April 2032 to 30 March 2032 . This is primarily due to the following factors: - 2032 is the end date agreed when the programme was rebalanced during 2017, based on the forecast completion date of all projects. This date remains extant. - The primary drivers for the completion date include the DREADNOUGHT Class in service date and achieving the endorsed ambition of a Single Integrated Operating Base. The volume of concurrent activity that can be commissioned is limited by the need to maintain operations and deconflict activity in a geographically constrained highly secure environment. Since 30 September 2020 baseline project end date of 30 March 2032, the programme completed Capability Audit to review the Portfolio Definition, which had no immediate impact on the programme completion date, although additional items of scope are under consideration by the respective Sponsor areas, which, if subsequently endorsed for Clyde Infrastructure Programme delivery, may change this.","fyBaseline":91.17,"fyForecast":93.36,"fyVariance":2.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":1586.9,"costNarrative":"Compared to financial year 19/20-Q2, the projects Baseline Whole Life Cost decreased from 1774.57m to �1586.90m. This is primarily due to the following factors: The whole life cost of the programme reflects the budget set following rebalance of the programme and formal agreement of the budget during 2017. This also reflects the budget for the 15 year life of the programme from Financial Year 17/18 to Financial Year 31/32","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber. This is primarily due to the following factors: Following overspend in some early projects, the programme was re-baselined to remain affordable. All changes were endorsed by the Clyde Infrastructure Programme Sponsor Board and…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21"},{"id":"MOD_0118_1718-Q3","year":2022,"name":"Clyde Infrastructure","department":"MOD","category":"Military Capability","description":"The Clyde Infrastructure Programme is managing the design, delivery and transition into operational use of new build and updated infrastructure facilities in Her Majesty's Naval Base Clyde (Faslane and Coulport).","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating decreased from Amber to Red. This is primarily due to the following factors: Although the programme is acknowledged to be well led and managed locally, the nature of the Programme means there are significant external factors which challenge its delivery including wider programme dependencies, market shortage of suitably experienced personnel and supply chain issues. Notwithstanding these challenges the Programme continues to deliver to plan.","startDate":"2015-09-07","endDate":"2032-04-01","scheduleNarrative":"Compared to 2021-Q4 the project end-date increased from 30 March 2032 to 01 April 2032. This is primarily due to the following factors: The programme end date remains within tolerable limits","fyBaseline":130.28,"fyForecast":119.81,"fyVariance":-9.0,"varianceNarrative":"The budget variance exceeds 5%. The main reasons for the variance are: 1) changes in the key supplier contract; 2) restricted site access due to ongoing COVID measures leading to delay, and 3) global supply chain issues. Although these factors, and that the site is heavily regulated with restricted access common place make it very challenging to deliver this complex Programme, this financial year has been positive with significant progress made and milestones achieved.","wholeLifeCost":1585.0,"costNarrative":"Compared to 2021-Q4, the projects Baseline Whole Life Cost decreased from 1586.90 (£m) to 1585.19 (£m). This is due to the following factors: This forecast underspend remains within tolerable limits.","benefits":null,"benefitsNarrative":"","themes":["Commercial & supply chain","Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating decreased from Amber to Red. This is primarily due to the following factors: Although the programme is acknowledged to be well led and managed locally, the nature of the Programme means there are significant external factors which challenge its…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"MOD_0118_1718-Q3","year":2023,"name":"Clyde Infrastructure","department":"MOD","category":"Military Capability","description":"The Clyde Infrastructure Programme has been established to manage the design, delivery and transition into operational use of new build and updated infrastructure facilities at HMNB Clyde in order to enable the continued safe and secure operation of submarines, support the arrival of the next generation 'Successor' Ballistic Missile Submarines, and create a single submarine centre of specialisation.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 26 of Freedom of Information Act 2000 (Defence).","startDate":"2015-09-07","endDate":"2032-04-01","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2032-04-01. This is primarily due to the following factors. NA","fyBaseline":113.48,"fyForecast":111.2,"fyVariance":-2.0,"varianceNarrative":"The budget variance is less than or equal to 5%","wholeLifeCost":1869.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 increased from 1585m. to 1869m. This is primarily due to the following factors. The Clyde Infrastructure Programme has been subject to Reference Class Forecasting analysis focused on Faslane and Coulport Portfolios and challenges in delivering in a Nuclear and operational environment. The increased Whole Life Cost considers the impacts of operational constraints, resource availability, extraordinary inflation and material availability.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This programme does not report cashable benefits. Its aim is to provision the armed forces with the equipment and / or infrastructure required.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Workforce & capability"],"evidenceExcerpt":"Exempt under Section 26 of Freedom of Information Act 2000 (Defence). Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2032-04-01. This is primarily due to the following factors. NA","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"MOD_0118_1718-Q3","year":2024,"name":"Clyde Infrastructure","department":"MOD","category":"Military Capability","description":"The HMNB Clyde Infrastructure Programme has been established to manage the design, delivery and transition into operational use of new build and updated infrastructure facilities at HMNB Clyde in order to enable the continued safe and secure operation of submarines, support the arrival of the next generation Dreadnought SSBNs, and create a single submarine centre of specialisation. With an estimated budget of £1.8Bn, it is a programme of strategic national importance that is critical to sustaining Continuous At Sea Deterrence (CASD), and the safe, sustainable and cost effective operation of the Submarine Force. The end state of the programme will be “An integrated submarine operating base at Clyde, supporting a Submarine Force that is safe, secure, sustainable, resilient and ready to excel in operations out to 2067.”","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. Sustaining delivery to plan will take significant effort (people and funds) over the next 4 years as CIP delivers the most complex phase of the programme in close proximity to submarine operations. The two main issues affecting delivery confidence are, delivery planning for recapitalisation of existing facilities while they continue to be used for submarine operations, and attracting and retaining skilled staff, particularly with nuclear skills but also with programme/project skills, to a remote site in a very tight labour market in western Scotland.","startDate":"2015-09-07","endDate":"2032-04-01","scheduleNarrative":"Compared to financial year 22/23-Q4, the programme's end-date at 23/24-Q4 remained scheduled to finish on 2032-04-01","fyBaseline":109.45,"fyForecast":97.61,"fyVariance":-10.818,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. Rebaseline exercises across the Coulport Portfolio and Northern Engineering Building Value Engineering exercise, resulting in delay in placing contract and slippage into next FY.","wholeLifeCost":1870.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 increased from 1869m. to 1870m. This is primarily due to the following factors. The programme has been subject to Reference Class Forecasting (RCF) analysis, focused on the Faslane and Coulport portfolios and the challenges in delivering in a nuclear and operational environment. From this RCF analysis a revised forecast has been introduced which has increased the WLC of the programme. This considers the impacts of operational constraints, resource availability, extraordinary inflation and material availability.","benefits":0.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 0m.","themes":["Delivery & schedule","Cost & funding","Workforce & capability","Commercial & supply chain"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. Sustaining delivery to plan will take significant effort (people and funds) over the next 4 years as CIP delivers the most complex phase of the programme in close proximity to submarine operations. The two main…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"MOD_0118_1718-Q3","year":2025,"name":"CLYDE INFRASTRUCTURE","department":"MoD","category":"Military Capability","description":"The HMNB Clyde Infrastructure Programme has been established to manage the design, delivery and transition into operational use of new build and updated infrastructure facilities at HMNB Clyde in order to: enable the continued safe and secure operation of submarines, support the arrival of the next generation Dreadnought Ship Submersible Ballistic Nuclear(SSBN) Submarines, and create a single submarine centre of specialisation. With an estimated budget of £1.8Bn, it is a programme of strategic national importance that is critical to sustaining Continuous At Sea Deterrence (CASD), and the safe, sustainable and cost effective operation of the Submarine Force. The end state of the programme will be “An integrated submarine operating base at Clyde, supporting a Submarine Force that is safe, secure, sustainable and resilient, and ready to excel in operations out to 2067”.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Project's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER, compared with the Infrastructure and Projects Authority's assessment last year of AMBER. This is due to the following factors. The DCA reflects ongoing work by the programme team to deliver a number of key projects during 2024/25.","startDate":"2015-09-07","endDate":null,"scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 01/04/2032.","fyBaseline":140.06,"fyForecast":148.03,"fyVariance":5.69,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The main driver for the in-year variance of 6% is that the programme builds in prudent risk contingency to accommodate delivery in an operational naval base.","wholeLifeCost":null,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 1870 to 1876. This is primarily due to the following factors. The programme remains within approval tolerances.","benefits":null,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits","themes":["Cost & funding","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"The Project's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER, compared with the Infrastructure and Projects Authority's assessment last year of AMBER. This is due to the following factors. The DCA reflects ongoing work by the programme team to deliver a number of key projects during 2024/25. Compared to financial year 23/24-Q4, the project's…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"MOD_0118_1718-Q3","year":2026,"name":"CLYDE INFRASTRUCTURE","department":"MOD","category":"Military Capability","description":"The HMNB Clyde Infrastructure Programme (CIP) has been established to manage the design, delivery and transition into operational use, new build and updated infrastructure facilities at HMNB Clyde. In order to: enable the continued safe and secure operation of submarines; support the arrival of the next generation Dreadnought SSBNs; and create a single submarine centre of specialisation. With an estimated budget of £3.3Bn, it is a programme of strategic national importance that is critical to sustaining Continuous At Sea Deterrence, and the safe, sustainable and cost effective operation of the Submarine Force. The end state of the programme will be “An integrated submarine operating base at Clyde, supporting a Submarine Force that is safe, secure, sustainable and resilient, and ready to excel in operations out to 2067.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors. 1. The Delivery Confidence Assessment reflects successful completion of nine projects by the programme team up to 2025/26. 2. Despite recent successes, our resource position remains a risk. We continue to face challenges in recruiting sufficient staff and securing the level of industry support required to sustain delivery. Resourcing needs will have to be proactively managed to ensure we can maintain momentum and meet our commitments.","startDate":"2015-09-07","endDate":"2032-04-01","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme end-date at 25/26-Q4 remained the same at 01/04/2032.","fyBaseline":255.06,"fyForecast":236.11,"fyVariance":7.43,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. 1. The main driver for the 7% in-year variance is the need for the programme to work within the operational areas of HMNB Clyde and forecast sufficient flexibility to maintain capital works around operational priorities. 2. During 25/26 operational plans have affected the ability to deliver the original planned spend.","wholeLifeCost":3324.98,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally-agreed Whole Life Cost at 25/26-Q4 (measured in £m) increased from £1876.3M to £3287.2M. This is primarily due to the following factors. 1. The forecast Whole Life Costs has increased to reflect new requirements and improved understanding of the conditions of the existing infrastructures and the levels of intervention required to achieve the required programme outcomes.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Delivery & schedule","Workforce & capability","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors. 1. The Delivery Confidence Assessment reflects successful completion of nine projects by the programme team up to 2025/26. 2. Despite recent successes, our resource position remains a…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"MOD_0118_1718-Q3","year":2025,"name":"CLYDE INFRASTRUCTURE","department":"MoD","category":"Military Capability","description":"The HMNB Clyde Infrastructure Programme has been established to manage the design, delivery and transition into operational use of new build and updated infrastructure facilities at HMNB Clyde in order to: enable the continued safe and secure operation of submarines, support the arrival of the next generation Dreadnought Ship Submersible Ballistic Nuclear(SSBN) Submarines, and create a single submarine centre of specialisation. With an estimated budget of £1.8Bn, it is a programme of strategic national importance that is critical to sustaining Continuous At Sea Deterrence (CASD), and the safe, sustainable and cost effective operation of the Submarine Force. The end state of the programme will be “An integrated submarine operating base at Clyde, supporting a Submarine Force that is safe, secure, sustainable and resilient, and ready to excel in operations out to 2067”.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Project's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER, compared with the Infrastructure and Projects Authority's assessment last year of AMBER. This is due to the following factors. The DCA reflects ongoing work by the programme team to deliver a number of key projects during 2024/25.","startDate":"2015-09-07","endDate":null,"scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 01/04/2032.","fyBaseline":140.06,"fyForecast":148.03,"fyVariance":5.69,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The main driver for the in-year variance of 6% is that the programme builds in prudent risk contingency to accommodate delivery in an operational naval base.","wholeLifeCost":null,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 1870 to 1876. This is primarily due to the following factors. The programme remains within approval tolerances.","benefits":null,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits","themes":["Cost & funding","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"The Project's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER, compared with the Infrastructure and Projects Authority's assessment last year of AMBER. This is due to the following factors. The DCA reflects ongoing work by the programme team to deliver a number of key projects during 2024/25. Compared to financial year 23/24-Q4, the project's…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":null,"attentionScore":20,"attentionReasons":["Current published delivery confidence is Amber","In-year forecast variance is +7.4%"]},{"id":"DEFRA_0040_2122-Q3","year":2026,"name":"COLLECTIONS, PACKAGING AND REFORMS PROGRAMME","department":"DEFRA","category":"Government Transformation and Service Delivery","description":"The CPR Programme, part of the Circular Economy Portfolio, aims to develop a world-class system for collection and disposal of packaging materials that emphasises reduction, reuse, and recycling. This initiative represents a significant shift in packaging management to support a responsible and resource-efficient economy while minimising the environmental impact of packaging and contributing to Net Zero goals across the four nations. The Programme is being delivered through four interlinking projects: Packaging Extended Producer Responsibility (pEPR), Simpler Recycling Collections (SRC), Deposit Return Scheme for Drinks Containers (DRS) and Digital Waste Tracking (DWT).","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. The programme was also rated Amber in the annual NISTA Review in May 2025. The report concluded that while the CPR programme improved and is broadly feasible (Amber), delivery remained highly complex and time-critical, requiring urgent action on commercial capability, contingency planning, stakeholder engagement, and benefits realisation to mitigate risks and ensure intended outcomes are achieved. All recommendations were actioned withing the given timescale. This rating is primarily due to the following factors: progress continued across legislation, funding and business readiness, with delivery increasingly focused on mobilisation and transition to live operations; however, outcomes remained sensitive to partner readiness, capacity constraints and reliance on digital delivery. For Extended Producer Responsibility for packaging (pEPR), the Amending SI was laid on 3 November and tracked to come into force on 1 January 2026, with Notices of Liabilities issued to producers on 14 October (4,305 invoices totalling £1.465bn) and delivery of some digital functionality pivoted to alternative plans to protect critical delivery. For Deposit Return Scheme (DRS), a Deposit Management Organisation (DMO) candidate for England and Northern Ireland was appointed on 2 May, progressed recruitment and financial modelling, split the IT programme into five phases (phase 1 analysis/design) and launched scheme branding (“Exchange for Change”), while highlighting the need for greater certainty before entering key contractual commitments. For Simpler Recycling Collections (SRC), delivery remained challenged by Local Authority funding and readiness risks (including Spending Review 25 Phase 1 decisions), mitigated through enhanced engagement (including a ‘Change Network’) and infrastructure planning; by Q3 over £258.3m had been paid to LAs for upfront costs and mobilisation continued toward household go live on 31 March 2026. For Digital Waste Tracking (DWT), Alpha was passed on 25 June 2025 (rated Amber), Private Beta commenced (from 16 July subject to approvals) and began testing on 7 November 2025, with Phase 1 legislation and the Impact Assessment progressing and public beta planned for April 2026. Delivery remains dependent on external partners (including Local Authorities, producers and waste management companies) being ready and able to adopt reforms, and continues to be constrained by infrastructure and processing capacity (notably for flexible plastics), supply chain constraints for physical assets (bins/vehicles), variability in local resourcing, and ongoing reliance on digital systems and data outputs across projects. The focus moving into the next quarter is on stabilising live delivery, intensifying readiness and engagement activity, and protecting delivery-critical milestones to prevent slippage and avoid risk escalation.","startDate":"2018-04-02","endDate":"2028-06-01","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 increased from 1 May 2028 to 1 June 2028. This is due to aligning with the DRS closure date captured within the milestones.","fyBaseline":2372.51,"fyForecast":2449.38,"fyVariance":3.24,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to a reduction in RDEL following Digital Waste Tracking updated delivery plans. In addition, there were reductions in both RDEL & CDEL in Simpler Recycling transitional costs to Local Authorities following detailed modelling and allowing for an appeals process. Further underspend arose from Depot Appeals costs being lower than originally forecast. As a result, the final outturn of circa £48.36m (TDEL) is below the agreed in-year budget of £70.4m (TDEL).","wholeLifeCost":5204.73,"costNarrative":"The figure differs from the previous year’s annual report as the GRIP was completed using a different methodology. When compared to the previous version of the PBC in December 2024, the project's Whole Life Cost decreased from £19,792m to £13,643m. The reductions are in part due to changes in assumptions for funding allocation for Simpler Recycling since previous projections.","benefits":13364.9,"benefitsNarrative":"Compared to financial year 24/25-Q4, the programme’s benefits at 25/26-Q4 increased from £11,611m to £15,971m. This is primarily due to an update to bring the assessment in line with updated analysis used in the programme business case. The updated estimate uses yearly net economic benefit figures (total benefits minus total costs). All figures are undiscounted, and in 2024 price base year. These figures have been quality assured and project level analysis has passed clearance processes.","themes":["Delivery & schedule","Cost & funding","Technical & integration","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. The programme was also rated Amber in the annual NISTA Review in May 2025. The report concluded that while the CPR programme improved and is broadly feasible (Amber), delivery remained highly complex and time-critical, requiring…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"DEFRA_0040_2122-Q3","year":2022,"name":"Collection and Packaging Reforms","department":"DEFRA","category":"Government Transformation and Service Delivery","description":"The three projects included within the Collection and Packaging reforms programme - Extended Producer Responsibility for packaging (pEPR), Deposit Return Scheme for drinks containers (DRS) and Consistency in Recycling Collections (Consistency) - will deliver significant changes to the waste collection and recycling sector including bringing benefits such as the creation of green jobs and significant carbon savings, contributing to Net Zero and outcomes in Defra's 25 Year Environment Plan.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 is Red Expected rating - RED. CPR agrees with the IPA RAG Rating and it matches our own Delivery Confidence Assessment at this time. We will continue on our path to green, as we work to identify and overcome our key delivery challenges and mitigate against our programme and project level risks. We are confident that our recently strengthened governance arrangements and our increased assurance forums will also support this. This will be complimented by our first IPA Gate 0 Review, to be held in June 2022, which will act as a further deep dive and we will incorporate further recommendations from this.","startDate":"2018-04-02","endDate":"2027-03-31","scheduleNarrative":"Your project end-date is 31 MAR 2027. This is primarily due to the following factors: CPR's does not have detailed plans at this point because some key policy questions and delivery approaches have not been finalised. Following publication of the EPR government response in March, market and stakeholder engagement has commenced. This will clarify headline options and timelines. Similar exercises are planned for DRS and Consistency. There is limited contingency in CPR plans and significant uncertainty. In response the team are identifying and escalating priority decisions to safeguard key milestones. The programme will continue to review the planned schedule and escalate any decisions required around meeting or changing key milestones via the appropriate escalation routes.","fyBaseline":12.92,"fyForecast":8.06,"fyVariance":-38.0,"varianceNarrative":"The baseline that was approved by Investment Committee in the SOBC was prior to business planning for 2021/22 and so was subject to change. The forecasted costs for 2021/22 ended up being lower than anticipated in the SOBC due to a number of uncertainties and delays to policy development, meaning work could not be progressed and therefore the money was not spent.","wholeLifeCost":null,"costNarrative":"Exempt under Section 35 of the Freedom of Information Act 2000 (Formulation of governmnet policy).","benefits":null,"benefitsNarrative":"","themes":["Delivery & schedule","Governance & assurance","Commercial & supply chain"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 is Red Expected rating - RED. CPR agrees with the IPA RAG Rating and it matches our own Delivery Confidence Assessment at this time. We will continue on our path to green, as we work to identify and overcome our key delivery challenges and mitigate against our programme…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"DEFRA_0040_2122-Q3","year":2023,"name":"Collection and Packaging Reforms","department":"DEFRA","category":"Government Transformation and Service Delivery","description":"The three projects included within the Collection and Packaging reforms programme Extended Producer Responsibility for packaging (pEPR), Deposit Return Scheme for drinks containers (DRS) and Consistency in Recycling Collections (Consistency) - will deliver significant changes to the waste collection and recycling sector including bringing benefits such as the creation of green jobs and significant carbon savings, contributing to Net Zero and outcomes in Defra's 25 Year Environment Plan","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Red. This is primarily due to the following factors. The Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q3 is RED. DEFRA agrees with this rating. Delivery confidence is low due to the challenging timescales in which DEFRA needs to implement the reforms. Work to support this implementation is ongoing with a particular focus on strengthening our plans, programme control and benefits management.","startDate":"2018-04-02","endDate":"2027-03-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2027-03-31. This is primarily due to the following factors. Collection & Packaging Reforms Programme has been delayed repeatedly. Two of three key Government responses to consultation now published: Extended Producer Responsibility - March 22; Deposit Return Scheme - January 23; Consistency - outstanding. Detailed delivery has been reprogrammed such that target end date is still feasible, but there is limited contingency available.","fyBaseline":29.16,"fyForecast":30.77,"fyVariance":6.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors: 1) The baseline that was approved by Investment Committee in the SOBC was prior to business planning for 2022/23 and was subject to change. 2) Delay in progressing work during 2021/22.","wholeLifeCost":null,"costNarrative":"Early planning GMPP project (The project has not yet passed SOC, or its programme equivalent)","benefits":11611.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 11611m. The project's departmental-agree monetised benefits at 22/23-Q4 is 11611m.The project's departmental-agree monetised benefits at 22/23-Q4 is 11611m.The project's departmental-agree monetised benefits at 22/23-Q4 is 11611m. 1) this estimate is based only on the economic transfer of packaging recycling and waste management costs from Local Authorities to producers - making obligated producers responsible for the disposal cost of their packaging is a key outcome of the programme 2) qualitatively, we understand there are significant additional benefits and the modelled values of these are currently undergoing review; we will be in a position to update on these by 31/12/2023.","themes":["Delivery & schedule","Cost & funding"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Red. This is primarily due to the following factors. The Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q3 is RED. DEFRA agrees with this rating. Delivery confidence is low due to the…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"DEFRA_0040_2122-Q3","year":2024,"name":"Collection and Packaging Reforms","department":"DEFRA","category":"Government Transformation and Service Delivery","description":"CPR is a programme of five projects included within the Collection and Packaging reforms programme - Extended Producer Responsibility for packaging (EPR), Deposit Return Scheme for Drinks Containers (DRS), Simpler Recycling, Waste Tracking, and Disposable Cups that will deliver significant changes to the waste collection and recycling sector including bringing benefits such as the creation of green jobs and significant carbon savings, contributing to Net Zero.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 decreased from Red to Amber. This is primarily due to the following factors. The Infrastructure Project Authority's Delivery Confidence Assessment rating at 2324 Q4 has improved to Amber. DEFRA agrees with this rating. Detailed plans are in place to address all of the IPA recommendations within the agreed timeline.","startDate":"2018-04-02","endDate":"2027-03-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2027-03-31. This is primarily due to the following factors. The programme was successfully reset in 2023. With meticulous management of our legislation and delivery, delivery is feasible, though highly challenging. There is limited contingency in CPR plans and key ministerial decisions remain outstanding; a late autumn general election could further impact. In response the team have identified and escalated priority decisions to safeguard key milestones. The programme will continue to review the planned schedule and escalate any decisions required around meeting or changing key milestones via the appropriate escalation routes.","fyBaseline":338.8,"fyForecast":341.71,"fyVariance":1.0,"varianceNarrative":"The budget variance is inferior or equal to 5%.","wholeLifeCost":null,"costNarrative":"Exempt under Section 35 of the Freedom of Information Act 2000 (Exempt under Section 35 of the Freedom of Information Act 2000 (Formulation of government policy,etc.))","benefits":11611.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 11611m. 1) this estimate is based only on the economic transfer of packaging recycling and waste management costs from Local Authorities to producers over the 10 year appraisal period - making obligated producers responsible for the disposal cost of their packaging is a key outcome of the programme 2) qualitatively, we understand there are significant additional benefits and the modelled values of these are currently undergoing review; we will be in a position to update on these by 30/04/2025.","themes":["Delivery & schedule","Cost & funding","Governance & assurance","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 decreased from Red to Amber. This is primarily due to the following factors. The Infrastructure Project Authority's Delivery Confidence Assessment rating at 2324 Q4 has improved to Amber. DEFRA agrees with this rating. Detailed plans…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"DEFRA_0040_2122-Q3","year":2025,"name":"COLLECTIONS, PACKAGING AND REFORMS PROGRAMME","department":"DEFRA","category":"Government Transformation and Service Delivery","description":"The CPR Programme, part of the forming Circular Economy Sub Portfolio, aims to develop a world-class system for collecting and packaging materials that emphasise reduction, reuse, and recycling. This initiative represents a significant shift in packaging management to support a responsible and resource-efficient economy while minimising the environmental impact of packaging and contributing to Net Zero goals across the four nations. The Programme will be delivered through four interlinking projects: Packaging Extended Producer Responsibility (pEPR), Simpler Recycling (SR), Deposit Return Scheme for Drinks Containers (DRS) and Digital Waste Tracking (DWT).","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at Amber. This is primarily due to the following factors‚ The previous assurance review of the CPR programme (Nov 23) highlighted critical concerns around the timelines for the Packaging Extended Producer Responsibility (pEPR) and Deposit Return Scheme (DRS) projects, particularly due to dependencies on secondary legislation, limited influence over local authorities, gaps in the pEPR commercial strategy, and resourcing challenges. Since then, a strong Programme team has been established, and progress has been made both technically and with stakeholders. However, several key risks remain and require continued focus: underperformance in IT system delivery for pEPR (though not currently affecting immediate milestones), a tight schedule for implementing the second phase of pEPR charging, unresolved issues around a pan-UK DRS agreement, local authority funding and delivery challenges, the need for sustained behaviour change across citizens and industry, and enforcement risks. The current performance of the programme team suggests that these should be capable of resolution, but success will depend on the capability and effectiveness of key private sector partners, particularly scheme management organisations.","startDate":"2018-04-02","endDate":"2028-05-01","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2027 to 01/05/2028. This is primarily due to the following factors‚ The Collection & Packaging Reforms Programme continues to make progress towards deliverables with multiple Statutory Instruments laid in Parliament; Digital Waste Tracking are scheduled to lay Phase 1 Statutory Instrument in spring 2026. As a result of the delays in the delivery of Digital Waste Tracking to April 2026, and the Deposit Return Scheme to October 2027, the programme's end date has been increased to 01/05/2028 to accommodate programme closure activities post-delivery of key projects. The programme will continue to review the planned schedule and escalate any decisions required around meeting or changing key milestones via the appropriate escalation routes.","fyBaseline":132.0,"fyForecast":132.0,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%. Within 5% tolerance","wholeLifeCost":1192.18,"costNarrative":"The project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) is 1192. This is primarily due to the following factors‚ Whole life cost (WLC) of the Collection & Packaging Reforms Programme aligns to HM Treasury's Green Book governance, and encompasses the total financial commitment required over the entire lifespan of a project. This includes all costs associated with its development, implementation, operation, maintenance, and decommissioning of assets that the project owns e.g. IT. The key components of the Collection & Packaging Reforms Programme WLC include: – Initial Capital Costs. – Expenses related to design, development and procurement. – Operational Costs. – Ongoing expenses such as staffing, utilities, and administration. – Maintenance & Repair Costs. – Costs for upkeep, servicing, and unexpected repairs. – Replacement Costs. – Expenses for renewing or upgrading assets over time. – End-of-Life Costs. – Decommissioning, disposal, or repurposing costs.","benefits":4100.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 11611 to 41000000000. This is primarily due to the following factors‚ The £11.6bn figure (£12bn adjusted for 2024) is the result of the £41bn benefits net of £29bn of costs across the appraisal period. The programme has operated on the assumption that the monetised benefits for the Collection & Packaging Reforms Programme equate to £11.6bn, this takes into account the existing benefits profile the programme is looking to deliver, but also the economic benefits. The figure of £11.6bn is the consistent messaging that has been provided in the programme business case to date.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at Amber. This is primarily due to the following factors‚ The previous assurance review of the CPR programme (Nov 23) highlighted critical concerns around the timelines for the Packaging Extended Producer Responsibility…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"DEFRA_0040_2122-Q3","year":2026,"name":"COLLECTIONS, PACKAGING AND REFORMS PROGRAMME","department":"DEFRA","category":"Government Transformation and Service Delivery","description":"The CPR Programme, part of the Circular Economy Portfolio, aims to develop a world-class system for collection and disposal of packaging materials that emphasises reduction, reuse, and recycling. This initiative represents a significant shift in packaging management to support a responsible and resource-efficient economy while minimising the environmental impact of packaging and contributing to Net Zero goals across the four nations. The Programme is being delivered through four interlinking projects: Packaging Extended Producer Responsibility (pEPR), Simpler Recycling Collections (SRC), Deposit Return Scheme for Drinks Containers (DRS) and Digital Waste Tracking (DWT).","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. The programme was also rated Amber in the annual NISTA Review in May 2025. The report concluded that while the CPR programme improved and is broadly feasible (Amber), delivery remained highly complex and time-critical, requiring urgent action on commercial capability, contingency planning, stakeholder engagement, and benefits realisation to mitigate risks and ensure intended outcomes are achieved. All recommendations were actioned withing the given timescale. This rating is primarily due to the following factors: progress continued across legislation, funding and business readiness, with delivery increasingly focused on mobilisation and transition to live operations; however, outcomes remained sensitive to partner readiness, capacity constraints and reliance on digital delivery. For Extended Producer Responsibility for packaging (pEPR), the Amending SI was laid on 3 November and tracked to come into force on 1 January 2026, with Notices of Liabilities issued to producers on 14 October (4,305 invoices totalling £1.465bn) and delivery of some digital functionality pivoted to alternative plans to protect critical delivery. For Deposit Return Scheme (DRS), a Deposit Management Organisation (DMO) candidate for England and Northern Ireland was appointed on 2 May, progressed recruitment and financial modelling, split the IT programme into five phases (phase 1 analysis/design) and launched scheme branding (“Exchange for Change”), while highlighting the need for greater certainty before entering key contractual commitments. For Simpler Recycling Collections (SRC), delivery remained challenged by Local Authority funding and readiness risks (including Spending Review 25 Phase 1 decisions), mitigated through enhanced engagement (including a ‘Change Network’) and infrastructure planning; by Q3 over £258.3m had been paid to LAs for upfront costs and mobilisation continued toward household go live on 31 March 2026. For Digital Waste Tracking (DWT), Alpha was passed on 25 June 2025 (rated Amber), Private Beta commenced (from 16 July subject to approvals) and began testing on 7 November 2025, with Phase 1 legislation and the Impact Assessment progressing and public beta planned for April 2026. Delivery remains dependent on external partners (including Local Authorities, producers and waste management companies) being ready and able to adopt reforms, and continues to be constrained by infrastructure and processing capacity (notably for flexible plastics), supply chain constraints for physical assets (bins/vehicles), variability in local resourcing, and ongoing reliance on digital systems and data outputs across projects. The focus moving into the next quarter is on stabilising live delivery, intensifying readiness and engagement activity, and protecting delivery-critical milestones to prevent slippage and avoid risk escalation.","startDate":"2018-04-02","endDate":"2028-06-01","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 increased from 1 May 2028 to 1 June 2028. This is due to aligning with the DRS closure date captured within the milestones.","fyBaseline":2372.51,"fyForecast":2449.38,"fyVariance":3.24,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to a reduction in RDEL following Digital Waste Tracking updated delivery plans. In addition, there were reductions in both RDEL & CDEL in Simpler Recycling transitional costs to Local Authorities following detailed modelling and allowing for an appeals process. Further underspend arose from Depot Appeals costs being lower than originally forecast. As a result, the final outturn of circa £48.36m (TDEL) is below the agreed in-year budget of £70.4m (TDEL).","wholeLifeCost":5204.73,"costNarrative":"The figure differs from the previous year’s annual report as the GRIP was completed using a different methodology. When compared to the previous version of the PBC in December 2024, the project's Whole Life Cost decreased from £19,792m to £13,643m. The reductions are in part due to changes in assumptions for funding allocation for Simpler Recycling since previous projections.","benefits":13364.9,"benefitsNarrative":"Compared to financial year 24/25-Q4, the programme’s benefits at 25/26-Q4 increased from £11,611m to £15,971m. This is primarily due to an update to bring the assessment in line with updated analysis used in the programme business case. The updated estimate uses yearly net economic benefit figures (total benefits minus total costs). All figures are undiscounted, and in 2024 price base year. These figures have been quality assured and project level analysis has passed clearance processes.","themes":["Delivery & schedule","Cost & funding","Technical & integration","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. The programme was also rated Amber in the annual NISTA Review in May 2025. The report concluded that while the CPR programme improved and is broadly feasible (Amber), delivery remained highly complex and time-critical, requiring…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"DEFRA_0040_2122-Q3","year":2025,"name":"COLLECTIONS, PACKAGING AND REFORMS PROGRAMME","department":"DEFRA","category":"Government Transformation and Service Delivery","description":"The CPR Programme, part of the forming Circular Economy Sub Portfolio, aims to develop a world-class system for collecting and packaging materials that emphasise reduction, reuse, and recycling. This initiative represents a significant shift in packaging management to support a responsible and resource-efficient economy while minimising the environmental impact of packaging and contributing to Net Zero goals across the four nations. The Programme will be delivered through four interlinking projects: Packaging Extended Producer Responsibility (pEPR), Simpler Recycling (SR), Deposit Return Scheme for Drinks Containers (DRS) and Digital Waste Tracking (DWT).","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at Amber. This is primarily due to the following factors‚ The previous assurance review of the CPR programme (Nov 23) highlighted critical concerns around the timelines for the Packaging Extended Producer Responsibility (pEPR) and Deposit Return Scheme (DRS) projects, particularly due to dependencies on secondary legislation, limited influence over local authorities, gaps in the pEPR commercial strategy, and resourcing challenges. Since then, a strong Programme team has been established, and progress has been made both technically and with stakeholders. However, several key risks remain and require continued focus: underperformance in IT system delivery for pEPR (though not currently affecting immediate milestones), a tight schedule for implementing the second phase of pEPR charging, unresolved issues around a pan-UK DRS agreement, local authority funding and delivery challenges, the need for sustained behaviour change across citizens and industry, and enforcement risks. The current performance of the programme team suggests that these should be capable of resolution, but success will depend on the capability and effectiveness of key private sector partners, particularly scheme management organisations.","startDate":"2018-04-02","endDate":"2028-05-01","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2027 to 01/05/2028. This is primarily due to the following factors‚ The Collection & Packaging Reforms Programme continues to make progress towards deliverables with multiple Statutory Instruments laid in Parliament; Digital Waste Tracking are scheduled to lay Phase 1 Statutory Instrument in spring 2026. As a result of the delays in the delivery of Digital Waste Tracking to April 2026, and the Deposit Return Scheme to October 2027, the programme's end date has been increased to 01/05/2028 to accommodate programme closure activities post-delivery of key projects. The programme will continue to review the planned schedule and escalate any decisions required around meeting or changing key milestones via the appropriate escalation routes.","fyBaseline":132.0,"fyForecast":132.0,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%. Within 5% tolerance","wholeLifeCost":1192.18,"costNarrative":"The project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) is 1192. This is primarily due to the following factors‚ Whole life cost (WLC) of the Collection & Packaging Reforms Programme aligns to HM Treasury's Green Book governance, and encompasses the total financial commitment required over the entire lifespan of a project. This includes all costs associated with its development, implementation, operation, maintenance, and decommissioning of assets that the project owns e.g. IT. The key components of the Collection & Packaging Reforms Programme WLC include: – Initial Capital Costs. – Expenses related to design, development and procurement. – Operational Costs. – Ongoing expenses such as staffing, utilities, and administration. – Maintenance & Repair Costs. – Costs for upkeep, servicing, and unexpected repairs. – Replacement Costs. – Expenses for renewing or upgrading assets over time. – End-of-Life Costs. – Decommissioning, disposal, or repurposing costs.","benefits":4100.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 11611 to 41000000000. This is primarily due to the following factors‚ The £11.6bn figure (£12bn adjusted for 2024) is the result of the £41bn benefits net of £29bn of costs across the appraisal period. The programme has operated on the assumption that the monetised benefits for the Collection & Packaging Reforms Programme equate to £11.6bn, this takes into account the existing benefits profile the programme is looking to deliver, but also the economic benefits. The figure of £11.6bn is the consistent messaging that has been provided in the programme business case to date.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at Amber. This is primarily due to the following factors‚ The previous assurance review of the CPR programme (Nov 23) highlighted critical concerns around the timelines for the Packaging Extended Producer Responsibility…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":31,"attentionScore":20,"attentionReasons":["Current published delivery confidence is Amber","Published end date moved 31 days later"]},{"id":"CO_0033_2122-Q1","year":2026,"name":"GOV.UK One Login","department":"DSIT","category":"Government Transformation and Service Delivery","description":"GOV.UK One Login is being developed as the single sign-on and identity verification front door for accessing government services. This will replace up to 300 individual accounts, accessed via 44 different sign-in methods; and will provide a significantly improved user experience. Our aim is to make it as simple, inclusive, and secure as possible for individuals to prove their identity and access connected services, while protecting them and the government from the risks of fraud.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors that‚ GOV.UK One Login is continuing to scale, with over 200 services already onboarded, for example apply for a Disclosure and Barring Service (DBS) check, and sign a mortgage deed .Over time, all central government services will be accessible through GOV.UK One Login. Over 15 million people have proven who they are through One Login, and its identity verification app - which has a rating of 4.6* on Android and iOS stores respectively - has been downloaded more than 16 million times.","startDate":"2021-01-04","endDate":"2028-03-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same which is 31st March 28 which covers the length of the approved Full Business Case which is running from 25/26 to 27/28 and has been approved by HM Treasury.","fyBaseline":120.24,"fyForecast":127.09,"fyVariance":5.7,"varianceNarrative":"The budget variance is less than or equal to 5%","wholeLifeCost":708.86,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) increased due to a successful new Full Business Case being approved at DSIT Investment Committee and HM Treasury Approvals Panel which provided GDS with the funding to continue the programme for another 3 financial years.","benefits":4731.89,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed benefits at 25/26-Q4 (measured in £m) increased due to the continuation of One Login as a funded programme. Its projected benefits were scrutinised by HM Treasury and will far outweigh financial investment into the programme.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors that‚ GOV.UK One Login is continuing to scale, with over 200 services already onboarded, for example apply for a Disclosure and Barring Service (DBS) check, and sign a mortgage deed…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"CO_0033_2122-Q1","year":2022,"name":"Digital Identity","department":"CO","category":"ICT","description":"One Login will provide a single account for citizens to login, prove their identity simply and securely, and access central government online services. It will enable more people to use more HMG services, improving inclusion and decreasing reliance on slower offline routes, and will reduce duplication, costs and fraud across government.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 is Amber. The One Login programme made significant progress in 2021/22, and momentum is continuing to build. It is fully funded following the 2021 Spending Review, and has strong backing from departments and services across government. One Login's sign-on component went live in October 2021 and, as a result of extensive development and planning work in 2021/22, the programme is on track to meet its critical milestones in 2022/23; these include the initial release of One Login's identity verification solution, the subsequent launch of an identity checking App, and the onboarding of its first services and live users. The overall AMBER rating reflects the challenging pace of delivery and the complex issues around resourcing, both of which the GDS team is actively desrisking.","startDate":"2021-01-04","endDate":"2025-03-31","scheduleNarrative":"Your project end-date is 31 MAR 2025. This is primarily due to the following factors: We are Amber at the end of 2021/22 due to recruitment and procurement delays. Overall confidence is increasing following careful planning and testing which has de-risked subsequent delivery.","fyBaseline":21.68,"fyForecast":16.58,"fyVariance":-24.0,"varianceNarrative":"Fewer staff than budgetted and length of procurement process for DOS contracts has resulted in lower than budget spend.","wholeLifeCost":22.0,"costNarrative":"Your projects Baseline Whole Life Cost is 21.68 (£m). This is primarily due to the following factors: Project is below budget due to fewer staff and delays in contract procurements.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Workforce & capability"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 is Amber. The One Login programme made significant progress in 2021/22, and momentum is continuing to build. It is fully funded following the 2021 Spending Review, and has strong backing from departments and services across government. One Login's sign-on component went…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"CO_0033_2122-Q1","year":2023,"name":"GOV.UK One Login","department":"CO","category":"ICT","description":"GOV.UK One Login will provide a single account for people to log in, prove (and then reuse) their identity in order to access all central HMG services. The programme, delivered by GDS, will replace the current digital landscape of siloed and duplicative sign-in and identity-proofing methods, providing a front door for services that will continue to be delivered by government departments. In doing so GOV.UK One Login will provide a better user experience, more efficient use of government resources and strengthen the government's ability to counter fraud. The system has been designed with inclusion at its core, so that it will work for everyone. One Login will raise the degree of confidence of identity verifications against internationally recognised GPG 45 standards and improve our ability to spot patterns and more sophisticated types of fraud.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. The GOV.UK One Login programme continued to deliver at pace in 2022/23, successfully meeting its major planned milestones. These included the launch of One Login's web- and app-based identity checking routes, integrated with its authentication and account functionality, and the onboarding of its first [8] government services. By year-end, over 1 million users had successfully proved their identity through One Login. The programme deepened its collaboration with departments, agreeing roadmaps that will see the bulk of central government services move to One Login in the current Spending Review period, in line with the programme's business case. This progress also enabled the legacy GOV.UK Verify system to be retired, as planned. The overall AMBER rating reflects the challenging pace of delivery, especially as GOV.UK One Login scales up, and the complexity of both the technical solution and the migration of major government services, all of which the GDS team is actively de-risking.","startDate":"2021-01-04","endDate":"2025-03-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2025-03-31. This is primarily due to the following factors. We are Amber at the end of 2022/23 due to the pace and complexity of delivery, complicated technical solutions, Cyber and Information security, and stakeholder challenges. We have multiple services and accessibility issues to consider which makes this a very technical and challenging programme within the product development space. Overall confidence is increasing following the upturn in recruitment, careful planning and effective risk management. Onboarding of the first set of services has given further confidence in completion of the programme as scheduled in 2025.","fyBaseline":114.0,"fyForecast":114.0,"fyVariance":0.0,"varianceNarrative":"The programme's departmental-agree Whole Life Cost at 22/23-Q4 is 305m. One Login build and running costs have ramped up in 23/24 as the product is developed and services onboarded.","wholeLifeCost":305.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 increased from 22m. to 305m. This is primarily due to the following factors. The programme's departmental-agree Whole Life Cost at 22/23-Q4 is 305m. One Login build and running costs have ramped up in 23/24 as the product is developed and services onboarded.","benefits":1752.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 1752m. The programme's departmental-agreed monetised benefits, at 22/23-Q4, is 1751.6m for the 5 year projection. The cashable savings in the business case include reducing identity verification and authentication costs; reducing total cost of online user support whilst reducing total user support; and, reducing public sector fraud. We are in the process of developing KPI targets, and developing a dashboard for benefits realisation. In doing so, we are working closely with HMT and the Evaluation Task Force in the development of this monitoring plan. We are also working with departments as they onboard to update our baseline assumptions, through the administration of a data collection instrument.","themes":["Cost & funding","Delivery & schedule","Technical & integration","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. The GOV.UK One Login programme continued to deliver at pace in 2022/23, successfully meeting its major planned milestones. These included the launch of One Login's…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"CO_0033_2122-Q1","year":2024,"name":"GOV.UK One Login","department":"CO","category":"ICT","description":"The programme has continued to scale-up; 30 government services are now live, including the HM Armed Forces Veteran Card; we remain on track to onboard 145 services by the end of 2024/25. More than 4.1 million people have so far proven their identity through One Login, with over 5 million downloads of the One Login identity checking app._x000D_ _x000D_ One Login's phased onboarding of HMRC users began, as planned, on 29 February; since then, internal users have successfully been testing the end-to-end journey. Other key developments include:_x000D_ _x000D_ * New data sharing legislation under the Digital Economy Act 2017 came into force on 8 February 2024, enabling One Login to access a wider range of data held by departments, and thus improve its identity verification options._x000D_ * The programme has developed an additional identity checking route for users without photographic documentation_x000D_ * The Chief Secretary to HMT approved One Login's Full Business Case.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. Delivery confidence remains at AMBER. A combination of headcount restrictions and no corresponding budget increase in 2024/25 would leave GOV.UK One Login with insufficient capacity to complete all of the work originally planned for this financial year. The programme is taking a number of steps to mitigate the risks including engaging with senior Cabinet Office risk governance groups.","startDate":"2021-01-04","endDate":"2025-03-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2025-03-31. This is primarily due to the following factors. The programme remains on track to achieve its core deliverables: to onboard 145 services - and their users - by the end of 2024/25; to operate an increasingly resilient, secure and inclusive live system, with multiple ways for people to prove their identity; to provide effective customer support; and to realise significant financial benefits for government_x000D_ _x000D_ The programme is rated Amber at the end of 2023/24 due to complexity of delivery; One Login is a multi-faceted technical solution, with a wide range of stakeholders and a challenging pace of delivery. The programme is, therefore, understandably managing a number of significant risks and issues. The programme has continued to strengthen its risk management processes over the past 12 months to ensure clearer escalation routes and implementation of treatments, as recognised in the IPA's Gate 4 review in November 2023.","fyBaseline":127.53,"fyForecast":127.61,"fyVariance":0.0,"varianceNarrative":"The budget variance is inferior or equal to 5%.","wholeLifeCost":329.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 increased from 305m. to 329m. This is primarily due to the following factors. The 305m covers the 3 year SR21 period for which funding has been agreed in the financial case of the current business case.","benefits":1981.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 2324-Q4 increased from 1752m. to 1981m. The GOV.UK One Login programme's Full Business Case, which has been approved by Cabinet Office and HM Treasury ministers, forecasted significant financial benefits. These include: reduced user authentication and identity verification costs to government; savings due to increased online accessibility and reduced reliance on more expensive offline routes; avoided duplicative spend across government on systems; and avoided fraud.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. Delivery confidence remains at AMBER. A combination of headcount restrictions and no corresponding budget increase in 2024/25 would leave GOV.UK One Login with…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"CO_0033_2122-Q1","year":2025,"name":"GOV.UK One Login","department":"DSIT","category":"ICT","description":"GOV.UK One Login, provides a single way for users to create an account, log in, and prove their identity to access all central government services. It replaces the previous landscape of siloed and duplicative sign-in and identity-proofing methods, providing one ‘front door’ for connected services that will continue to be operated by departments. This consolidation eliminates inefficiencies from a fragmented system of 190 individual accounts and 44 different sign-in methods. By streamlining access, this consolidation reduces costs, lowers the risk of fraud, enhances inclusion, and significantly improves the user experience, amplifying benefits to both government and citizens, ensuring it remains the ‘market-leading’ account and identity verification solution across government.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The AMBER rating reflects steady progress and strong momentum across delivery milestones, including a growing number of live services and expanded user adoption. The SRO SQA rating was driven by the programme’s demonstrable operational maturity, sustained leadership support, and positive onboarding decisions from major departments such as HMRC and DVLA over the last FY. The rating remains AMBER due to the complexity of the roadmap and ongoing dependencies on other departments for onboarding and benefits realisation. These interdependencies present delivery risks that require continued active management. The scaling of internal capabilities and steps taken on accessibility and digital inclusion are progressing positively, but overall deliverability is still contingent on cross-government alignment and sustained engagement.","startDate":"2021-01-04","endDate":"2028-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2025 to 31/03/2028. This is primarily due to the following factors‚ The schedule has been increased in this ARMP cycle, reflecting strong delivery progress and alignment with planned milestones. Key motivators for this decision include the continued expansion of live services, the successful onboarding of significant departments (HMRC in Private Beta, DVLA, a first DWP service and some devolved administrations; e.g. Welsh Gov), and the projected scaling of user adoption. The decision to keep the programme on the GMPP for a further 3 years supports the ambition to complete onboarding of all central government services. While the programme continues to meet key internal delivery targets, the schedule remains dependent on departmental onboarding timelines and the coordination of benefits realisation across government. The leading issue facing the programme relates to ‘Service Migration’, however a number of treatments and mitigations are in place to effectively counteract service onboarding slippage. The Programme continues to iterate a features roadmap which captures the initiatives and functionality that will be delivered over the next 3 Financial years. This is closely aligned with our onboarding and migration roadmap, which shows the future ‘pipeline’ of services that will move to One Login between now and when the programme reaches critical mass. These dependencies introduce a level of complexity, but no material delays have occurred that would necessitate a change to the overall timeline.","fyBaseline":133.7,"fyForecast":129.91,"fyVariance":2.83,"varianceNarrative":"The budget variance is less than or equal to 5%. As outlined below, there was an overspend during the FY 24/25 which was settled in a DSIT Investment Committee increasing the Programmes Whole Life Cost. Because of this amount being regularised and the funding envelope for One Login increased, there was no overspend by the end of the Financial Year 24/25.","wholeLifeCost":342.19,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased. This is primarily due to the following factors‚ additional funding was received via an Investment Committee and agreed between Perm Secretaries of DSIT and Cabinet Office and an addendum to the Business Case prepared. Key factors that motivated the increase in WLC in FY 24/25 were; 1. onboarding complexities that led to delays in the onboarding of key Reliant Parties this year, 2. Emergent cyber security risks related to geo political events requiring increased resilience in order to protect the programme from cyber threats, and 3. increased reliance on more expensive Managed Service Providers and Contingent Labour contractors as a result of Civil Service headcount caps which meant the Programme could not recruit Civil Servants into these roles. Significant progress has been made against each of these factors.","benefits":3641.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased. This is primarily due to the following factors‚ The economic benefits realised by One Login increased in 2024/25 compared to 2023/24 as more services onboarded onto the programme. The benefits of the One Login programme exceeded costs in 2024/25. However, benefits were not as high as had originally been forecast. This was due to delays in some services onboarding to the programme. The benefits process in its current iteration has reached steady state. We have moved over to a more automated process for service volumes. We are now working on further improvements to the benefits modelling.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Technical & integration"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The AMBER rating reflects steady progress and strong momentum across delivery milestones, including a growing number of live services and expanded user adoption. The…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"CO_0033_2122-Q1","year":2026,"name":"GOV.UK One Login","department":"DSIT","category":"Government Transformation and Service Delivery","description":"GOV.UK One Login is being developed as the single sign-on and identity verification front door for accessing government services. This will replace up to 300 individual accounts, accessed via 44 different sign-in methods; and will provide a significantly improved user experience. Our aim is to make it as simple, inclusive, and secure as possible for individuals to prove their identity and access connected services, while protecting them and the government from the risks of fraud.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors that‚ GOV.UK One Login is continuing to scale, with over 200 services already onboarded, for example apply for a Disclosure and Barring Service (DBS) check, and sign a mortgage deed .Over time, all central government services will be accessible through GOV.UK One Login. Over 15 million people have proven who they are through One Login, and its identity verification app - which has a rating of 4.6* on Android and iOS stores respectively - has been downloaded more than 16 million times.","startDate":"2021-01-04","endDate":"2028-03-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same which is 31st March 28 which covers the length of the approved Full Business Case which is running from 25/26 to 27/28 and has been approved by HM Treasury.","fyBaseline":120.24,"fyForecast":127.09,"fyVariance":5.7,"varianceNarrative":"The budget variance is less than or equal to 5%","wholeLifeCost":708.86,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) increased due to a successful new Full Business Case being approved at DSIT Investment Committee and HM Treasury Approvals Panel which provided GDS with the funding to continue the programme for another 3 financial years.","benefits":4731.89,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed benefits at 25/26-Q4 (measured in £m) increased due to the continuation of One Login as a funded programme. Its projected benefits were scrutinised by HM Treasury and will far outweigh financial investment into the programme.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors that‚ GOV.UK One Login is continuing to scale, with over 200 services already onboarded, for example apply for a Disclosure and Barring Service (DBS) check, and sign a mortgage deed…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"CO_0033_2122-Q1","year":2025,"name":"GOV.UK One Login","department":"DSIT","category":"ICT","description":"GOV.UK One Login, provides a single way for users to create an account, log in, and prove their identity to access all central government services. It replaces the previous landscape of siloed and duplicative sign-in and identity-proofing methods, providing one ‘front door’ for connected services that will continue to be operated by departments. This consolidation eliminates inefficiencies from a fragmented system of 190 individual accounts and 44 different sign-in methods. By streamlining access, this consolidation reduces costs, lowers the risk of fraud, enhances inclusion, and significantly improves the user experience, amplifying benefits to both government and citizens, ensuring it remains the ‘market-leading’ account and identity verification solution across government.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The AMBER rating reflects steady progress and strong momentum across delivery milestones, including a growing number of live services and expanded user adoption. The SRO SQA rating was driven by the programme’s demonstrable operational maturity, sustained leadership support, and positive onboarding decisions from major departments such as HMRC and DVLA over the last FY. The rating remains AMBER due to the complexity of the roadmap and ongoing dependencies on other departments for onboarding and benefits realisation. These interdependencies present delivery risks that require continued active management. The scaling of internal capabilities and steps taken on accessibility and digital inclusion are progressing positively, but overall deliverability is still contingent on cross-government alignment and sustained engagement.","startDate":"2021-01-04","endDate":"2028-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2025 to 31/03/2028. This is primarily due to the following factors‚ The schedule has been increased in this ARMP cycle, reflecting strong delivery progress and alignment with planned milestones. Key motivators for this decision include the continued expansion of live services, the successful onboarding of significant departments (HMRC in Private Beta, DVLA, a first DWP service and some devolved administrations; e.g. Welsh Gov), and the projected scaling of user adoption. The decision to keep the programme on the GMPP for a further 3 years supports the ambition to complete onboarding of all central government services. While the programme continues to meet key internal delivery targets, the schedule remains dependent on departmental onboarding timelines and the coordination of benefits realisation across government. The leading issue facing the programme relates to ‘Service Migration’, however a number of treatments and mitigations are in place to effectively counteract service onboarding slippage. The Programme continues to iterate a features roadmap which captures the initiatives and functionality that will be delivered over the next 3 Financial years. This is closely aligned with our onboarding and migration roadmap, which shows the future ‘pipeline’ of services that will move to One Login between now and when the programme reaches critical mass. These dependencies introduce a level of complexity, but no material delays have occurred that would necessitate a change to the overall timeline.","fyBaseline":133.7,"fyForecast":129.91,"fyVariance":2.83,"varianceNarrative":"The budget variance is less than or equal to 5%. As outlined below, there was an overspend during the FY 24/25 which was settled in a DSIT Investment Committee increasing the Programmes Whole Life Cost. Because of this amount being regularised and the funding envelope for One Login increased, there was no overspend by the end of the Financial Year 24/25.","wholeLifeCost":342.19,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased. This is primarily due to the following factors‚ additional funding was received via an Investment Committee and agreed between Perm Secretaries of DSIT and Cabinet Office and an addendum to the Business Case prepared. Key factors that motivated the increase in WLC in FY 24/25 were; 1. onboarding complexities that led to delays in the onboarding of key Reliant Parties this year, 2. Emergent cyber security risks related to geo political events requiring increased resilience in order to protect the programme from cyber threats, and 3. increased reliance on more expensive Managed Service Providers and Contingent Labour contractors as a result of Civil Service headcount caps which meant the Programme could not recruit Civil Servants into these roles. Significant progress has been made against each of these factors.","benefits":3641.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased. This is primarily due to the following factors‚ The economic benefits realised by One Login increased in 2024/25 compared to 2023/24 as more services onboarded onto the programme. The benefits of the One Login programme exceeded costs in 2024/25. However, benefits were not as high as had originally been forecast. This was due to delays in some services onboarding to the programme. The benefits process in its current iteration has reached steady state. We have moved over to a more automated process for service volumes. We are now working on further improvements to the benefits modelling.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Technical & integration"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The AMBER rating reflects steady progress and strong momentum across delivery milestones, including a growing number of live services and expanded user adoption. The…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":0,"attentionScore":20,"attentionReasons":["Current published delivery confidence is Amber","In-year forecast variance is +5.7%"]},{"id":"DHSC_0067_2021-Q3","year":2026,"name":"INTEGRATED SINGLE FINANCIAL ENVIRONMENT","department":"DHSC","category":"Information and Communications Technology (ICT)","description":"The objective of the programme is to procure and implement the next generation of the NHS England Group Integrated Single Financial Environment (ISFE) and associated financial services. This is due to the expiry of the existing service provision contract. The procurement is for a managed service provision which must include a Financial and Accounting system as part of the service. The service is for the NHS England Group of organisations which consists of NHS England, 42 Integrated Care Boards (ICBs), 4Commissioning Support Units (CSU) and the Health Service Safety Investigations Body (HSSIB). The annual funding for the NHS England Group is £180 billion. This funding is managed through the financial and accounting system resulting in payments being made between the NHS England Group to provider organisations (Trusts & Foundation Trusts), commercial suppliers, General Practitioners (GPs), Opticians, Dentists, Pharmacists, as well as the general running costs of the organisation, e.g. payroll.","ipaDca":"Green","sroDca":null,"deliveryConfidence":"Green","deliveryConfidenceSource":"Independent assurance","commentary":"NISTA/SRO Delivery Confidence Assessment (DCA) rating was AMBER following the NISTA Gate 4 review on 07/07/2025. The programme implemented the recommendations from that review and successfully went live on 01/10/2025. Therefore the SRO confidence at 31/03/2026 is GREEN. The Gate 5 assurance review is due to take place the week commencing 11/05/2026.","startDate":"2018-08-01","endDate":"2026-03-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 changed from 31/10/2024 to 28/02/2026. This was because the programme go-live date was delayed by 18 months, the business case for the revised go-live date of 01/10/2025 was only approved in September 2025 and therefore this is the first opportunity to update the completion date.","fyBaseline":25.05,"fyForecast":24.81,"fyVariance":0.97,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":187.99,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 remained the same.","benefits":177.08,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 remained the same.","themes":["Governance & assurance","Cost & funding","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"NISTA/SRO Delivery Confidence Assessment (DCA) rating was AMBER following the NISTA Gate 4 review on 07/07/2025. The programme implemented the recommendations from that review and successfully went live on 01/10/2025. Therefore the SRO confidence at 31/03/2026 is GREEN. The Gate 5 assurance review is due to take place the week commencing 11/05/2026.…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"DHSC_0067_2021-Q3","year":2021,"name":"Integrated Single Financial Environment","department":"DHSC","category":"ICT","description":"The objective of the project is to procure the next generation of the NHS England group and NHSI Integrated Single Financial Environment (ISFE) and associated financial services. The procurement is for a managed service provision which must include a Financial and Accounting system as part of the service to commence in April 2024.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Red.This is primarily due to the following factors: While we consider the overall delivery confidence for the project to be amber/green, there are some areas that need to be urgently addressed in order to achieve delivery, specifically in relation to access to sufficient resource in some key areas such as commercial strategy and project management support","startDate":"2018-08-01","endDate":"2024-10-31","scheduleNarrative":"The project end-date is 31 October 2024. This is primarily due to the following factors: The project end date remains as 31 October 2024. There have been some delays in the Outline Business case reaching the approvals stage as a result of further work required on the content based on feedback received, however we don't anticipate any change to the forecast project end date","fyBaseline":0.23,"fyForecast":0.23,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":300.69,"costNarrative":"The projects Baseline Whole Life Cost is �300.69m. This is primarily due to the following factors: The budgeted whole life cost for the project is based on financial modelling of the re-provision of the Integrated Single Financial Environment service. The service will be subject to procurement and potential variability depending on supplier pricing.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Red.This is primarily due to the following factors: While we consider the overall delivery confidence for the project to be amber/green, there are some areas that need to be urgently addressed in order to achieve delivery, specifically in relation to access to sufficient…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21"},{"id":"DHSC_0067_2021-Q3","year":2022,"name":"Integrated Single Financial Environment","department":"DHSC","category":"ICT","description":"The objective of the project is to procure the next generation of the NHS England group Integrated Siingle Finnacial Environment (ISFE) and associated financial services. The procurement is for a managed service provision which must include a Financial and Accounting system as part of the service to commence in April 2024.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 decreased from Red to Amber Recommendations in place from the AAP review undertaken in August 2021 have been actioned. The Outline Business Case for the project has received approval from DHSC, Cabinet Office and HMT, with conditions. All pre-procurement conditions have been met and the remainder are built into Full Business Case development plans. Resource remains under ongoiing review to ensure we have the capacity and capability to deliver current and future stages of the project. While the project is on track to deliver, there remains limited contingency within the plans, so it is critical that we maintain momentum, hence the amber rating. .","startDate":"2018-08-01","endDate":"2024-10-31","scheduleNarrative":"Compared to 2021-Q4, your project end-date remained scheduled to finish on 31 OCT 2024 . This is primarily due to the following factors: The project end date remains as 31 October 2024.. The project is on-track to deliver in accordance with planned schedule.","fyBaseline":0.23,"fyForecast":0.73,"fyVariance":217.0,"varianceNarrative":"The budget variance exceeds 5%. The budget for delivery of the project was exceeded due to an increase in resource following critical recommendations from an IPA review.","wholeLifeCost":301.0,"costNarrative":"Compared to 2021-Q4,the projects Baseline Whole Life Cost remained at 300.69 (£m). This is primarily due to the following factors: The budgeted whole life cost for the project is based on financial modelling of the re-provision of the Integrated Single Financial Environment service. The service is subject to procurement and costs are subject to variability depending on supplier pricing.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Workforce & capability","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 decreased from Red to Amber Recommendations in place from the AAP review undertaken in August 2021 have been actioned. The Outline Business Case for the project has received approval from DHSC, Cabinet Office and HMT, with…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"DHSC_0067_2021-Q3","year":2023,"name":"Integrated Single Financial Environment","department":"DHSC","category":"ICT","description":"The objective of the project is to procure and implement the next generation of the NHSE England group Integrated Single Financial Environment (ISFE) and associated financial services. The procurement phase of the project is now complete and a contract is in place with NHS Shared Business Services (NHS SBS). Implementation is underway for the managed service provision to commence in April 2024.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber (SRO rating). This is primarily due to the following factors. The has been no change in the DCA, which remains at amber. Steps have been taken to minimise delivery risk, such as adopting early implementation of activities where possible, running activities in parallel and adopting an agile approach, however there is limited contingency available in the plan should there be any slippage, hence the amber rating.","startDate":"2018-08-01","endDate":"2024-10-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2024-10-31. This is primarily due to the following factors. There has been no change to the project end-date, which is 31 Oct 2024.","fyBaseline":6.7,"fyForecast":5.23,"fyVariance":-22.0,"varianceNarrative":"The budget variance exceeds 5%. The budget for delivery of the project was exceeded due to an increase in resource following critical recommendation from an IPA review.","wholeLifeCost":301.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 remained at 301m. This is primarily due to the following factors. The Baseline Whole Life Cost is based on submitted bid costs.","benefits":37.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 37m. The project's departmental-agree monetised benefits at 22/23-Q4 is 37m.The project's departmental-agree monetised benefits at 22/23-Q4 is 37m.The project's departmental-agree monetised benefits at 22/23-Q4 is 37m. Monetised benefits have been updated to reflect the succesful bid submission.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber (SRO rating). This is primarily due to the following factors. The has been no change in the DCA, which remains at amber. Steps have been taken to minimise delivery risk, such as adopting early implementation of activities where possible, running…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"DHSC_0067_2021-Q3","year":2024,"name":"Integrated Single Financial Environment","department":"DHSC","category":"ICT","description":"The objective of the project is to procure and implement the next generation of the NHS England Group Integrated Single Financial Environment (ISFE) and associated financial services. Due to the expiry of the existing service provision contract. The procurement is for a managed service provision which must include a Financial and Accounting system as part of the service._x000D_ The service is for the NHS England Group of organisations which consists of 42 Integrated Care Boards (ICBs) 4 Commissioning Support Units (CSUs), NHS England and a provider organisation. The annual funding for NHS England Group is 170 billion. This funding is managed through the financial and accounting system resulting in payments being made between the NHS England Group to Provider organisation (Trusts & FTs), commercial suppliers, General Practitioners (GPs), Opticians, Dentists, Pharmacists, Public Health, as well as the general running costs of an organisation e.g. payroll payments.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Delivery Confidence Assessment rating at 23/24-Q4 increased from Amber(SRO rating) to Red(IPA rating). This is primarily due to the following factors. Following recommendations from a Red Gate 0 report in February 2024, an action plan is under development and the programme is undergoing a re-planning exercise to determine a new go-live date._x000D_ Progress against the action plan will be assessed in an Assurance of Action Plan (AAP) review scheduled for May 2024.","startDate":"2018-08-01","endDate":"2024-10-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2024-10-31. This is primarily due to the following factors. Go-live of the new service will be delayed beyond 1 April 2024,which will impact on project end date. A re-planning exercise is underway to determine new go-live and project end dates.","fyBaseline":9.8,"fyForecast":7.3,"fyVariance":-26.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. Due to the delay in go live the expected costs related to implementation support resource and milestone payments are lower than budgeted for. However the costs have effectively been deferred to 2024/25.","wholeLifeCost":218.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 decreased from 301m. to 218m. This is primarily due to the following factors. Baseline Whole Life Costs have been updated to reflect the 7 year contract period as approved by HMT. Optional extension costs are not included and remain subject to HMT approval.","benefits":37.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 37m. Monetised benefits have been updated to reflect the succesful bid submission.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Delivery Confidence Assessment rating at 23/24-Q4 increased from Amber(SRO rating) to Red(IPA rating). This is primarily due to the following factors. Following recommendations from a Red Gate 0 report in February 2024, an action plan is under development and the programme is undergoing a re-planning exercise to…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"DHSC_0067_2021-Q3","year":2025,"name":"INTEGRATED SINGLE FINANCIAL ENVIRONMENT","department":"DHSC","category":"ICT","description":"The objective of the programme is to procure and implement the next generation of the NHS England Group Integrated Single Financial Environment (ISFE) and associated financial services. This is due to the expiry of the existing service provision contract. The procurement is for a managed service provision which must include a Financial and Accounting system as part of the service. The service is for the NHS England Group of organisations which consists of NHS England, forty-two Integrated Care Boards (ICBs), four Commissioning Support Units (CSU) and Health Service Safety Investigations Body (HSSIB). The annual funding for the NHS England Group is £180 billion. This funding is managed through the financial and accounting system resulting in payments being made between the NHS England Group to provider organisations (Trusts & Foundation Trusts), commercial suppliers, General Practitioners (GPs), Opticians, Dentists, Pharmacists, as well as the general running costs of the organisation, e.g. payroll.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from RED to AMBER. This is primarily due to the following factors: the programme has implemented the recommendations from the review of roles and responsibilities to ensure there is sufficient capacity and capability within the programme team as well as the suppliers to deliver it. Programme governance now reflects best practice with clear leadership on the strategic aims of the programme, appropriate monitoring and oversight of delivery, as well as strong risk and issue management. There is an updated programme plan with no overlap between critical phases which has been approved by the Programme Board and by key stakeholders.","startDate":"2018-08-01","endDate":"2024-10-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/10/2024. This is primarily due to the following factors: the project end date 31 October 2024 aligns with the current approved full business case, as agreed with the Department of Health and Social Care. The revised go-live date is 1 October 2025, with a programme end date of 30 April 2026. These will be agreed formally as part of the revised full business case, which is currently underway.","fyBaseline":18.99,"fyForecast":10.17,"fyVariance":46.48,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors: The baseline costs for 2024 - 2025 are based upon an original April 2024 go-live date in-line with the current approved full business case, as requested by the Department of Health and Social Care team. The current reported costs are based on the actual costs for 2024 - 2025 with the resulting underspend is due to the programme delay to go-live from April 2024 to October 2025. The forecast profile spend will be updated once a revised full business case is approved.","wholeLifeCost":208.98,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 218 to 208. This is primarily due to the following factors: that the £208 million figure is derived from the current approved full business case, whereas the £218 million are derived from the outline business case.","benefits":200.64,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 37 to 200. This is primarily due to the following factors: that the ISFE 2 benefits case is evaluated to be c£200 million, which reconciles to the approved full business case. This is a significant uplift on the £37 million, which was previously reported as part of the outline business case.","themes":["Cost & funding","Approvals & decisions","Governance & assurance","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from RED to AMBER. This is primarily due to the following factors: the programme has implemented the recommendations from the review of roles and responsibilities to ensure there is sufficient capacity and capability within…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"DHSC_0067_2021-Q3","year":2026,"name":"INTEGRATED SINGLE FINANCIAL ENVIRONMENT","department":"DHSC","category":"Information and Communications Technology (ICT)","description":"The objective of the programme is to procure and implement the next generation of the NHS England Group Integrated Single Financial Environment (ISFE) and associated financial services. This is due to the expiry of the existing service provision contract. The procurement is for a managed service provision which must include a Financial and Accounting system as part of the service. The service is for the NHS England Group of organisations which consists of NHS England, 42 Integrated Care Boards (ICBs), 4Commissioning Support Units (CSU) and the Health Service Safety Investigations Body (HSSIB). The annual funding for the NHS England Group is £180 billion. This funding is managed through the financial and accounting system resulting in payments being made between the NHS England Group to provider organisations (Trusts & Foundation Trusts), commercial suppliers, General Practitioners (GPs), Opticians, Dentists, Pharmacists, as well as the general running costs of the organisation, e.g. payroll.","ipaDca":"Green","sroDca":null,"deliveryConfidence":"Green","deliveryConfidenceSource":"Independent assurance","commentary":"NISTA/SRO Delivery Confidence Assessment (DCA) rating was AMBER following the NISTA Gate 4 review on 07/07/2025. The programme implemented the recommendations from that review and successfully went live on 01/10/2025. Therefore the SRO confidence at 31/03/2026 is GREEN. The Gate 5 assurance review is due to take place the week commencing 11/05/2026.","startDate":"2018-08-01","endDate":"2026-03-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 changed from 31/10/2024 to 28/02/2026. This was because the programme go-live date was delayed by 18 months, the business case for the revised go-live date of 01/10/2025 was only approved in September 2025 and therefore this is the first opportunity to update the completion date.","fyBaseline":25.05,"fyForecast":24.81,"fyVariance":0.97,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":187.99,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 remained the same.","benefits":177.08,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 remained the same.","themes":["Governance & assurance","Cost & funding","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"NISTA/SRO Delivery Confidence Assessment (DCA) rating was AMBER following the NISTA Gate 4 review on 07/07/2025. The programme implemented the recommendations from that review and successfully went live on 01/10/2025. Therefore the SRO confidence at 31/03/2026 is GREEN. The Gate 5 assurance review is due to take place the week commencing 11/05/2026.…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"DHSC_0067_2021-Q3","year":2025,"name":"INTEGRATED SINGLE FINANCIAL ENVIRONMENT","department":"DHSC","category":"ICT","description":"The objective of the programme is to procure and implement the next generation of the NHS England Group Integrated Single Financial Environment (ISFE) and associated financial services. This is due to the expiry of the existing service provision contract. The procurement is for a managed service provision which must include a Financial and Accounting system as part of the service. The service is for the NHS England Group of organisations which consists of NHS England, forty-two Integrated Care Boards (ICBs), four Commissioning Support Units (CSU) and Health Service Safety Investigations Body (HSSIB). The annual funding for the NHS England Group is £180 billion. This funding is managed through the financial and accounting system resulting in payments being made between the NHS England Group to provider organisations (Trusts & Foundation Trusts), commercial suppliers, General Practitioners (GPs), Opticians, Dentists, Pharmacists, as well as the general running costs of the organisation, e.g. payroll.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from RED to AMBER. This is primarily due to the following factors: the programme has implemented the recommendations from the review of roles and responsibilities to ensure there is sufficient capacity and capability within the programme team as well as the suppliers to deliver it. Programme governance now reflects best practice with clear leadership on the strategic aims of the programme, appropriate monitoring and oversight of delivery, as well as strong risk and issue management. There is an updated programme plan with no overlap between critical phases which has been approved by the Programme Board and by key stakeholders.","startDate":"2018-08-01","endDate":"2024-10-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/10/2024. This is primarily due to the following factors: the project end date 31 October 2024 aligns with the current approved full business case, as agreed with the Department of Health and Social Care. The revised go-live date is 1 October 2025, with a programme end date of 30 April 2026. These will be agreed formally as part of the revised full business case, which is currently underway.","fyBaseline":18.99,"fyForecast":10.17,"fyVariance":46.48,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors: The baseline costs for 2024 - 2025 are based upon an original April 2024 go-live date in-line with the current approved full business case, as requested by the Department of Health and Social Care team. The current reported costs are based on the actual costs for 2024 - 2025 with the resulting underspend is due to the programme delay to go-live from April 2024 to October 2025. The forecast profile spend will be updated once a revised full business case is approved.","wholeLifeCost":208.98,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 218 to 208. This is primarily due to the following factors: that the £208 million figure is derived from the current approved full business case, whereas the £218 million are derived from the outline business case.","benefits":200.64,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 37 to 200. This is primarily due to the following factors: that the ISFE 2 benefits case is evaluated to be c£200 million, which reconciles to the approved full business case. This is a significant uplift on the £37 million, which was previously reported as part of the outline business case.","themes":["Cost & funding","Approvals & decisions","Governance & assurance","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from RED to AMBER. This is primarily due to the following factors: the programme has implemented the recommendations from the review of roles and responsibilities to ensure there is sufficient capacity and capability within…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":-1,"transition":"Improved","endDateDeltaDays":516,"attentionScore":20,"attentionReasons":["Published end date moved 516 days later"]},{"id":"HMRC_0143_2223-Q2","year":2026,"name":"VOA NextGen Rating Programme","department":"VOA","category":"Government Transformation and Service Delivery","description":"The NextGen Rating Programme (NGR) is replacing VOA’s multiple legacy technologies for Non-Domestic Rating, digitising casework processes and customer interactions into a single integrated system. It also set out to deliver measures from the last Government’s Business Rates Review and Non-Domestic Rating Act (2023). The programme is continuing to deliver commitments on greater transparency on valuations for customers, and work is continuing on potential options for a streamlined process for challenging valuations. The programme supports the government’s ambition for a more responsive and fairer business rates system, including the move from five-yearly to three-yearly revaluations from 2023.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Since the creation of the NextGen Rating Programme in October 2024, Programme teams are well established with strong governance and oversight, supported by robust supplier and financial management. This mature position has been reinforced by NISTA, who awarded the programme a Green rating in a Gate 0/3 review in January 2026. During FY25/26 the Programme delivered the first major milestones, with Disclosure and changes to support Improvement Relief for Revaluation 2026 going live in November 2025. The design and build of the core online service has been completed, with progression into Private Beta held while rollout plans are reviewed. Progress for the internal Valuation Operating System (VOS) for Non-Domestic Rating is well advanced. Release 1 (Pre-Valuation) remains on track for July 2026, followed by Release 2 (Valuation) by November 2026. Focus remains on managing testing, defect resolution and data migration, alongside supporting business readiness for upcoming changes. The Amber delivery confidence assessment reflects the need to deliver VOS Releases 1 and 2 to tight timelines, alongside some remaining uncertainty on scope, sequencing and costs for later releases. Work is underway to finalise delivery plans and commercial arrangements for these later releases, supporting improved certainty and a return to Green.","startDate":"2024-10-01","endDate":"2030-04-01","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same, 01/04/2030.","fyBaseline":49.69,"fyForecast":46.94,"fyVariance":5.53,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to scope items being re-planned into later years of the Programme which reduced the projected 25/26 spend.","wholeLifeCost":300.38,"costNarrative":"Compared to financial year 24/25-Q4, the projects departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) remained at £328.5m.","benefits":216.77,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at £251m.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Scope & requirements"],"evidenceExcerpt":"Since the creation of the NextGen Rating Programme in October 2024, Programme teams are well established with strong governance and oversight, supported by robust supplier and financial management. This mature position has been reinforced by NISTA, who awarded the programme a Green rating in a Gate 0/3 review in January 2026. During FY25/26 the Programme…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"HMRC_0143_2223-Q2","year":2023,"name":"VOA Non - Domestic Rating Reforms Programme","department":"VOA","category":"Government Transformation and Service Delivery","description":"The Non - Domestic Rating (NDR) Reforms Programme is a multi-year programme to deliver key commitments from the Governments 2021 Review of Business Rates. These include changes to the non-domestic rating system to enable a sustainable move to three- yearly revaluations, measures to provide greater transparency to ratepayers, and the implementation of new reliefs.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 is Amber. This is primarily due to the following factors. The Infrastructure Projects Authority assesses the overall Departmental Commentary Actions for the Non-Domestic Rating Reforms Programme to be Amber.This reflects the current uncertainty over the impact of delays to a separate Valuation Office Agency programme to replace legacy technology.The Review Team assessed that the issue is resolvable but will require constant management attention by the Programme. The Programme is undertaking a significant amount of work to manage the dependency and consider alternative delivery options as a contingency.","startDate":"2022-04-01","endDate":"2029-03-31","scheduleNarrative":"The project's end-date at 22/23-Q4 is 2029-03-31. This is primarily due to the following factors. The Programme is currently on plan but will need to impact the delay to legislation on delivery timelines.","fyBaseline":4.2,"fyForecast":4.2,"fyVariance":0.0,"varianceNarrative":"The GMPP project did not provide data","wholeLifeCost":110.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 22/23-Q4 is 110m. This is primarily due to the following factors. The programme is at an early stage having concluded its initial discovery stage. This informed the development of the Strategic Outline Business informed by order of magnitude IT costs, subsequently achieving His Majesty's Treasury Approval in January 2023. The next iteration of the Business Case (outline ) will be following the Alpha stage (testing prototypes and optimum customer journey assumptions) of the programme expected in Autumn 2023. This will produce refined Whole Life Cycle costs.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. The project did not provide departmental-agree monetised benefits at 22/23-Q4.The project did not provide departmental-agree monetised benefits at 22/23-Q4.The project did not provide departmental-agree monetised benefits at 22/23-Q4. We are working to quantify the economic benefit of more frequent revaluations that the programme enables, and consider whether it is appropriate to include this at Outline Business Case stage.","themes":["Delivery & schedule","Cost & funding","Technical & integration","Approvals & decisions"],"evidenceExcerpt":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 is Amber. This is primarily due to the following factors. The Infrastructure Projects Authority assesses the overall Departmental Commentary Actions for the Non-Domestic Rating Reforms Programme to be Amber.This reflects the current uncertainty over the impact of delays to a…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"HMRC_0143_2223-Q2","year":2024,"name":"VOA Non - Domestic Rating Reforms Programme","department":"VOA","category":"Government Transformation and Service Delivery","description":"The Non-Domestic Rating Reforms Programme (NDRR) continues to make good progress. It concluded its Alpha phase in April 2024 with a successful GDS assessment and has now moved into Beta. Improvement Relief, a headline measure from the Government's Business Rates Review and the Non-Domestic Rating Act (NDR) 2023, was delivered on 1 April 2024. The NDR Act has successfully completed its Parliamentary passage, gaining Royal Assent in autumn 2023. The Programme's Outline Business Case (OBC) has received internal approvals and is undergoing Treasury approval. An AO assessment has been completed, confirming that the programme meets the requirements of Managing Public Money. A summary will be published by the end of April.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. The overall Delivery Confidence Assessment for the NDR Reforms Programme is Amber. Work is ongoing to address risks in relation to long-term funding certainty, programme capability and capacity, and dependence on technology change in other programmes.","startDate":"2022-04-01","endDate":"2029-03-31","scheduleNarrative":"The project's end-date at 23/24-Q4 is 2029-03-31. This is primarily due to the following factors. The Programme has developed its plan based on the preferred option in the business case. The schedule remains on track. Dates for the introduction of new customer requirements and the disclosure of additional information on valuations will be confirmed in due course.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"","wholeLifeCost":286.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 increased from 110m. to 286m. This is primarily due to the following factors. Whole life costs have been reviewed and revised at Outline Business Case (OBC) stage.","benefits":333.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 2324-Q4 increased from 0m. to 333m.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Workforce & capability"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. The overall Delivery Confidence Assessment for the NDR Reforms Programme is Amber. Work is ongoing to address risks in relation to long-term funding certainty, programme capability and capacity, and dependence on…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"HMRC_0143_2223-Q2","year":2025,"name":"VOA NextGen Rating Programme","department":"VOA","category":"Government Transformation and Service Delivery","description":"The NextGen Rating Programme (NGR) is replacing VOA’s legacy technology for Non-Domestic Rating, digitising casework processes and customer interactions, and delivering measures from the last Government’s Business Rates Review and Non-Domestic Rating Act (2023). It will introduce a new legal duty on property occupiers to supply valuation-relevant information on an events-driven basis (‘the Information Duty’), underpinned by a new compliance regime; greater transparency on valuations for customers; and a streamlined process for challenging valuations. The programme supports the government’s ambition for a more responsive and fairer business rates system, including the move from five-yearly to three-yearly revaluations from 2023.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ FY23/24 Q4 data referred to the Non-Domestic Rating Reform (NDRR) Programme. During FY24/25, NDRR merged with the Non-Domestic Rating elements of the Business Systems Transformation (BST) Programme to form the single NextGen Rating (NGR) Programme. The VOA ExCom agreed to progress the merger of the two programmes to form NGR, following a NISTA review of BST in February 2024. NGR was formally launched as a single new programme on 1 October 2024. This merger has the benefit of ensuring the end-to-end delivery of all the VOA’s Non-Domestic Rating reforms are being managed in one place, strengthening governance and oversight, programme controls and the management of cross-dependencies. Due to this change in scope, it is important to note that the Delivery Confidence Assessment from FY2023/24 (NDRR Programme) should not be compared with the Delivery Confidence Assessment from FY2024/25 (the combined single GMPP NextGen Rating Programme).","startDate":"2024-10-01","endDate":"2030-04-01","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2029 to 01/04/2030. This is primarily due to the following factors‚ FY23/24 Q4 data referred to the Non-Domestic Rating Reform (NDRR) Programme. During FY24/25, NDRR merged with the Non-Domestic Rating elements of the Business Systems Transformation (BST) Programme to form the NextGen Rating (NGR) Programme. NGR formally launched as a new programme on 1 October 2024. The programme end date has been refreshed in line with the new NGR Programme Business Case and baseline plan (approved by NISTA - Nov’24, HMT - Dec’24 & HMRC CIDC - Mar’25). The new baseline plan ensures the programme has sufficient contingency in place for early life support following the mandating of Information Duty in 2029.","fyBaseline":25.67,"fyForecast":20.2,"fyVariance":21.31,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The NextGen Rating programme had an underspend in FY24/25. This is due to several factors: • Managed Service Provider appointment: Previous estimates were based on an average view of supplier rate cards as the new supplier had not yet been appointed. The appointed supplier rate card is lower than the averages initially used to forecast. • Slower onboarding: Due to a longer procurement and onboarding process, there were slight delays in the start of the Manager Service Provider which meant delays in spend. • Release approach: The programme took the decision to split the technical build into a release approach as opposed to ‘big-bang’ to minimise delivery risk. This has meant less spend than anticipated in FY24/25 with greater than expected spend in later years. This will be managed in line with the agreed programme funding envelope, as per the Programme Business Case.","wholeLifeCost":328.5,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 286 to 328. This is primarily due to the following factors‚ FY23/24 Q4 data referred to the Non-Domestic Rating Reform (NDRR) Programme. During FY24/25, NDRR merged with the Non-Domestic Rating elements of the Business Systems Transformation (BST) Programme to form the NextGen Rating (NGR) Programme. NGR formally launched as a new programme on 1 October 2024. Programme Whole Life Costs (WLC) have been refreshed in line with the new NGR Programme Business Case which was approved by HMT in December 2024. The WLC therefore cannot be compared across FY2023/24 (NDR-R WLC) and FY2024/25 (NGR WLC).","benefits":251.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) decreased from 333 to 251. This is primarily due to the following factors‚ FY23/24 Q4 data referred to the Non-Domestic Rating Reform (NDRR) Programme. During FY24/25, NDRR merged with the Non-Domestic Rating elements of the Business Systems Transformation (BST) Programme to form the NextGen Rating (NGR) Programme. NGR formally launched as a new programme on 1 October 2024. Programme benefits have been refreshed in line with the new NGR Programme Business Case which was approved by HMT in December 2024.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ FY23/24 Q4 data referred to the Non-Domestic Rating Reform (NDRR) Programme. During FY24/25, NDRR merged with the Non-Domestic Rating elements of the Business Systems…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"HMRC_0143_2223-Q2","year":2026,"name":"VOA NextGen Rating Programme","department":"VOA","category":"Government Transformation and Service Delivery","description":"The NextGen Rating Programme (NGR) is replacing VOA’s multiple legacy technologies for Non-Domestic Rating, digitising casework processes and customer interactions into a single integrated system. It also set out to deliver measures from the last Government’s Business Rates Review and Non-Domestic Rating Act (2023). The programme is continuing to deliver commitments on greater transparency on valuations for customers, and work is continuing on potential options for a streamlined process for challenging valuations. The programme supports the government’s ambition for a more responsive and fairer business rates system, including the move from five-yearly to three-yearly revaluations from 2023.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Since the creation of the NextGen Rating Programme in October 2024, Programme teams are well established with strong governance and oversight, supported by robust supplier and financial management. This mature position has been reinforced by NISTA, who awarded the programme a Green rating in a Gate 0/3 review in January 2026. During FY25/26 the Programme delivered the first major milestones, with Disclosure and changes to support Improvement Relief for Revaluation 2026 going live in November 2025. The design and build of the core online service has been completed, with progression into Private Beta held while rollout plans are reviewed. Progress for the internal Valuation Operating System (VOS) for Non-Domestic Rating is well advanced. Release 1 (Pre-Valuation) remains on track for July 2026, followed by Release 2 (Valuation) by November 2026. Focus remains on managing testing, defect resolution and data migration, alongside supporting business readiness for upcoming changes. The Amber delivery confidence assessment reflects the need to deliver VOS Releases 1 and 2 to tight timelines, alongside some remaining uncertainty on scope, sequencing and costs for later releases. Work is underway to finalise delivery plans and commercial arrangements for these later releases, supporting improved certainty and a return to Green.","startDate":"2024-10-01","endDate":"2030-04-01","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same, 01/04/2030.","fyBaseline":49.69,"fyForecast":46.94,"fyVariance":5.53,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to scope items being re-planned into later years of the Programme which reduced the projected 25/26 spend.","wholeLifeCost":300.38,"costNarrative":"Compared to financial year 24/25-Q4, the projects departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) remained at £328.5m.","benefits":216.77,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at £251m.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Scope & requirements"],"evidenceExcerpt":"Since the creation of the NextGen Rating Programme in October 2024, Programme teams are well established with strong governance and oversight, supported by robust supplier and financial management. This mature position has been reinforced by NISTA, who awarded the programme a Green rating in a Gate 0/3 review in January 2026. During FY25/26 the Programme…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"HMRC_0143_2223-Q2","year":2025,"name":"VOA NextGen Rating Programme","department":"VOA","category":"Government Transformation and Service Delivery","description":"The NextGen Rating Programme (NGR) is replacing VOA’s legacy technology for Non-Domestic Rating, digitising casework processes and customer interactions, and delivering measures from the last Government’s Business Rates Review and Non-Domestic Rating Act (2023). It will introduce a new legal duty on property occupiers to supply valuation-relevant information on an events-driven basis (‘the Information Duty’), underpinned by a new compliance regime; greater transparency on valuations for customers; and a streamlined process for challenging valuations. The programme supports the government’s ambition for a more responsive and fairer business rates system, including the move from five-yearly to three-yearly revaluations from 2023.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ FY23/24 Q4 data referred to the Non-Domestic Rating Reform (NDRR) Programme. During FY24/25, NDRR merged with the Non-Domestic Rating elements of the Business Systems Transformation (BST) Programme to form the single NextGen Rating (NGR) Programme. The VOA ExCom agreed to progress the merger of the two programmes to form NGR, following a NISTA review of BST in February 2024. NGR was formally launched as a single new programme on 1 October 2024. This merger has the benefit of ensuring the end-to-end delivery of all the VOA’s Non-Domestic Rating reforms are being managed in one place, strengthening governance and oversight, programme controls and the management of cross-dependencies. Due to this change in scope, it is important to note that the Delivery Confidence Assessment from FY2023/24 (NDRR Programme) should not be compared with the Delivery Confidence Assessment from FY2024/25 (the combined single GMPP NextGen Rating Programme).","startDate":"2024-10-01","endDate":"2030-04-01","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2029 to 01/04/2030. This is primarily due to the following factors‚ FY23/24 Q4 data referred to the Non-Domestic Rating Reform (NDRR) Programme. During FY24/25, NDRR merged with the Non-Domestic Rating elements of the Business Systems Transformation (BST) Programme to form the NextGen Rating (NGR) Programme. NGR formally launched as a new programme on 1 October 2024. The programme end date has been refreshed in line with the new NGR Programme Business Case and baseline plan (approved by NISTA - Nov’24, HMT - Dec’24 & HMRC CIDC - Mar’25). The new baseline plan ensures the programme has sufficient contingency in place for early life support following the mandating of Information Duty in 2029.","fyBaseline":25.67,"fyForecast":20.2,"fyVariance":21.31,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The NextGen Rating programme had an underspend in FY24/25. This is due to several factors: • Managed Service Provider appointment: Previous estimates were based on an average view of supplier rate cards as the new supplier had not yet been appointed. The appointed supplier rate card is lower than the averages initially used to forecast. • Slower onboarding: Due to a longer procurement and onboarding process, there were slight delays in the start of the Manager Service Provider which meant delays in spend. • Release approach: The programme took the decision to split the technical build into a release approach as opposed to ‘big-bang’ to minimise delivery risk. This has meant less spend than anticipated in FY24/25 with greater than expected spend in later years. This will be managed in line with the agreed programme funding envelope, as per the Programme Business Case.","wholeLifeCost":328.5,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 286 to 328. This is primarily due to the following factors‚ FY23/24 Q4 data referred to the Non-Domestic Rating Reform (NDRR) Programme. During FY24/25, NDRR merged with the Non-Domestic Rating elements of the Business Systems Transformation (BST) Programme to form the NextGen Rating (NGR) Programme. NGR formally launched as a new programme on 1 October 2024. Programme Whole Life Costs (WLC) have been refreshed in line with the new NGR Programme Business Case which was approved by HMT in December 2024. The WLC therefore cannot be compared across FY2023/24 (NDR-R WLC) and FY2024/25 (NGR WLC).","benefits":251.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) decreased from 333 to 251. This is primarily due to the following factors‚ FY23/24 Q4 data referred to the Non-Domestic Rating Reform (NDRR) Programme. During FY24/25, NDRR merged with the Non-Domestic Rating elements of the Business Systems Transformation (BST) Programme to form the NextGen Rating (NGR) Programme. NGR formally launched as a new programme on 1 October 2024. Programme benefits have been refreshed in line with the new NGR Programme Business Case which was approved by HMT in December 2024.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ FY23/24 Q4 data referred to the Non-Domestic Rating Reform (NDRR) Programme. During FY24/25, NDRR merged with the Non-Domestic Rating elements of the Business Systems…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":0,"attentionScore":20,"attentionReasons":["Current published delivery confidence is Amber","In-year forecast variance is +5.5%"]},{"id":"DCMS_0118_2223-Q1","year":2026,"name":"Youth Investment Fund","department":"DCMS","category":"Infrastructure and Construction","description":"Over £300 million to create, expand and improve youth facilities and services in England by September 2026. The Youth Investment Fund’s (YIF) objective is to create, expand and improve up to 300 local youth facilities and their services, in order to drive positive outcomes for young people, including improved mental and physical wellbeing, and skills for life and work. YIF is a commitment to young people to transform the out-of-school youth sector. It will provide truly innovative youth facilities in priority areas, and early-stage/seed resource funding to underpin them, enabling more positive activities that deliver improved outcomes for young people.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 the programme improved it's delivery confidence rating to Amber. This is primarily due to the following factors‚ the majority of projects within the programme have now been completed with the remainder due to be complete within the first half of the next financial year. This means we can be more confident that the last part of the year we are likely to deliver the programme's expected benefits.","startDate":"2022-04-01","endDate":null,"scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 increased from last year's published end-date to this year's published end-date, 31 March 2028. This is primarily due to the inclusion of the MMC workstream in the programme, end dates of which have slipped into 2026/27 FY; and the delivery of our benefits realisation programme then supports projects being financially viable one year after opening.","fyBaseline":47.84,"fyForecast":45.11,"fyVariance":5.71,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to some projects slipping into 26/27 with all remaining projects due to be completed in the first half of the next financial year.","wholeLifeCost":360.15,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) increased from last year's WLC 316.94m to 354.58m. This is primarily due to the actual costs for 25/26 and forecasted costs for 26/27 being accounted. Please note figures referenced in the narratives were entered as nominal and the system automatically converts them to Real Terms.","benefits":2437.88,"benefitsNarrative":"Compared to financial year 24/25 Q4 the projects departmentally agreed Benefits 2,455.29m has increased to this years Benefits total £2,922.600m. This is due to a programme model change, which decreased from 30 years to 20 years. This is reflective of the current re-modelling, with the FBC now inclusive of the MMC figure which provides a justification to this change.","themes":["Cost & funding","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 the programme improved it's delivery confidence rating to Amber. This is primarily due to the following factors‚ the majority of projects within the programme have now been completed with the remainder due to be complete within the first half of the…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"DCMS_0118_2223-Q1","year":2023,"name":"Youth Investment Fund","department":"DCMS","category":"Infrastructure and Construction","description":"The Youth Investment Funds (YIF) objective is to create, expand and improve local youth facilities and their services, in order to drive positive outcomes for young people, including improved mental and physical wellbeing, and skills for life and work.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 is Amber. This is primarily due to the following factors. The programme has developed a pipeline for assessing bids and allocating funding. This will inform in year controls and help track the construction and budgets.","startDate":"2022-04-01","endDate":"2025-03-31","scheduleNarrative":"The project's end-date at 22/23-Q4 is 2025-03-31. This is primarily due to the following factors. The programme is on track to deliver objectives by March 2025","fyBaseline":22.03,"fyForecast":18.87,"fyVariance":-14.0,"varianceNarrative":"The Youth Investment Fund saw substantial demand for capital funding, however, a significant number of applications were at too early a stage of development to be considered for the programme.The created an underspend for this financial year, and in order to balance the funds spending profile with the emerging pipeline of capital works, that has been reprofiled into 24/25. At Supplementary Estimates 2022-23 DCMSs supply estimate that was approved contained a Budget Exchange and a surrenderoffundingfor the YouthInvestmentFund, in order to ensure the spending profile reflected the latest delivery assessment at the time.","wholeLifeCost":341.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 22/23-Q4 is 341m. This is primarily due to the following factors. The 368m will provide youth facilities and services, including smallcommunity youth spaces, youth centres and activity centres in the most underprivilegedareas across the country.This investment will: Build/preserve youth facilities that are fit for purpose in areas of need Develop environmentally sustainable youth facilities Drive improvements in youth sector capability Improve access, participation and short-term wellbeing of young people Improve the evidence base for the youth sector","benefits":5318.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 5318m. The project's departmental-agree monetised benefits at 22/23-Q4 is 5318m.The project's departmental-agree monetised benefits at 22/23-Q4 is 5318m.The project's departmental-agree monetised benefits at 22/23-Q4 is 5318m. There are a number of monetised and non-monetised benefits. Monetised include: Attending youth services is associated with higher wellbeing for beneficiaries in the short-runActivities lead to intermediary outcomes (e.g. leadership, communication, aspiration) and therefore future life outcomes (e.g. education, employability, health)Intermediary outcomes also lead to impacts on wider society (e.g. reduced crime, lower public spending, higher tax revenue).Developing land or renovating existing physical infrastructure will lead to a higher land value. Non-monetised include - Increasing community infrastructure has links with increases in social capital and subsequent economic outcomes for communities. Renovating buildings lowers ongoing costs, and prevents further expenditure on repairs in the long run. Additional income will be generated in order to continue running the services.","themes":["Cost & funding","Delivery & schedule","Workforce & capability"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 is Amber. This is primarily due to the following factors. The programme has developed a pipeline for assessing bids and allocating funding. This will inform in year controls and help track the construction and budgets. The project's end-date at 22/23-Q4 is 2025-03-31.…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"DCMS_0118_2223-Q1","year":2024,"name":"Youth Investment Fund","department":"DCMS","category":"Infrastructure and Construction","description":"We are investing over 300 million to provide youth facilities, including small community youth spaces, youth centres and activity centres in some of the most underprivileged areas across the country. This comprises 288 million capital funding (CDEL) and 80 million revenue funding (RDEL). Our spending objectives are to: - Build/preserve youth facilities that are fit for purpose - Develop environmentally sustainable youth facilities - Drive improvements in youth sector capability - Improve access, participation and short-term wellbeing of young people - Improve the evidence base for the youth sector","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. This is primarily due to YIF’s spend profile and timescales being too compressed to deliver all of its projects. However, to address this we are revising our Full Business Case (FBC) to seek a limited amount of funding beyond this date to support the forecast of a small number of projects extending into 2025/26. Quantifying this is work in progress.","startDate":"2022-04-01","endDate":"2025-03-31","scheduleNarrative":"The project's end-date at 23/24-Q4 is 2025-03-31. This is primarily due to the following factors. The fund's progress has diverged from the original spend profile which was agreed in 2022. This is due to a combination of factors, including that the original spend profile was misaligned with the usual profile of a large capital portfolio, a lack of shovel-ready projects available to bid into the fund at the onset, delays in the planning system, the capacity and capability of some grantees to manage their projects, and the amount of legal diligence needed to assure the projects before construction could commence. The latest FBC applies adjustments to forecasts to learn from the previous experience of managing the fund, allow for risk and inherent optimism, and provide an appropriate level of contingency. This, together with an enhanced level of centrally-provided professional project management support to grantees, and the fact that the vast majority of projects will shortly have started on site, gives significantly greater confidence in the revised timescales.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"The construction programme is driven by grantees applying for and managing the funding. The budget is under constant review to ensure funding is available in the fiscal year it is required.","wholeLifeCost":310.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 decreased from 341m. to 310m. This is primarily due to the following factors: The whole life costs are under constant review. With up to 300 individual projects the costs are demand led and monitored by the intermediary grant maker.","benefits":4094.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agreed monetised benefits at 23/24-Q4 decreased from 5318m. to 4094m. The decrease in monetised benefits is due to the programme being able to view a project pipeline of real projects and a £30m net reduction in budget. Prior to this the estimations were based on hypothetical projects and a higher level of investment.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Workforce & capability"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. This is primarily due to YIF’s spend profile and timescales being too compressed to deliver all of its projects. However, to address this we are revising our Full Business Case (FBC) to seek a limited amount of…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"DCMS_0118_2223-Q1","year":2025,"name":"Youth Investment Fund","department":"DCMS","category":"Infrastructure and Construction","description":"The Youth Investment Fund’s (YIF) objective is to create, expand and improve up to 300 local youth facilities and their services, in order to drive positive outcomes for young people, including improved mental and physical wellbeing, and skills for life and work. YIF is a commitment to young people to transform the out-of-school youth sector. It will provide truly innovative youth facilities in priority areas, and early-stage/seed resource funding to underpin them, enabling more positive activities that deliver improved outcomes and opportunities for young people.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ some projects not being complete by the 31/03/25. This has meant that the programme has been extended to 31/03/2026 and therefore the projects within our delivery pipeline are still on-going.","startDate":"2022-04-01","endDate":"2026-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2025 to 31/03/2026. This is primarily due to the following factors‚ some projects not completing by 31/03/2025 due to delays as a result of protracted legal due diligence activities, time lost on construction sites as a result of poor weather/ground conditions and over optimism on the behalf of grantees and the sub-contractors with their scheduling.","fyBaseline":234.62,"fyForecast":225.71,"fyVariance":3.8,"varianceNarrative":"The budget variance is less than or equal to 5%. The in-year variance for 2024/25 was 16.6% (£175m actual spend against post-Supps 2023 budget of £210m). Budget was re-profiled into 2025/26 through the updated FBC with no significant impact on the overall budget. We remain within the FBC envelope","wholeLifeCost":310.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 310. This is primarily due to the following factors‚ in-year variance relating to slippage of some projects rather than genuine underspends. The projects will be completed to the same overall budget, but in 2025/26 rather than 2024/25 with the programme's lifecycle extended accordingly.","benefits":4094.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) decreased from 4094 to 2434.5. This is primarily due to the following factors‚ a change in the benefits model, which decreased the measurement period from 30 years to 20 years. Next quarter's data will include an updated figure to include the recently included MMC portfolio.","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ some projects not being complete by the 31/03/25. This has meant that the programme has been extended to 31/03/2026 and therefore the projects within our delivery…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"DCMS_0118_2223-Q1","year":2026,"name":"Youth Investment Fund","department":"DCMS","category":"Infrastructure and Construction","description":"Over £300 million to create, expand and improve youth facilities and services in England by September 2026. The Youth Investment Fund’s (YIF) objective is to create, expand and improve up to 300 local youth facilities and their services, in order to drive positive outcomes for young people, including improved mental and physical wellbeing, and skills for life and work. YIF is a commitment to young people to transform the out-of-school youth sector. It will provide truly innovative youth facilities in priority areas, and early-stage/seed resource funding to underpin them, enabling more positive activities that deliver improved outcomes for young people.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 the programme improved it's delivery confidence rating to Amber. This is primarily due to the following factors‚ the majority of projects within the programme have now been completed with the remainder due to be complete within the first half of the next financial year. This means we can be more confident that the last part of the year we are likely to deliver the programme's expected benefits.","startDate":"2022-04-01","endDate":null,"scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 increased from last year's published end-date to this year's published end-date, 31 March 2028. This is primarily due to the inclusion of the MMC workstream in the programme, end dates of which have slipped into 2026/27 FY; and the delivery of our benefits realisation programme then supports projects being financially viable one year after opening.","fyBaseline":47.84,"fyForecast":45.11,"fyVariance":5.71,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to some projects slipping into 26/27 with all remaining projects due to be completed in the first half of the next financial year.","wholeLifeCost":360.15,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) increased from last year's WLC 316.94m to 354.58m. This is primarily due to the actual costs for 25/26 and forecasted costs for 26/27 being accounted. Please note figures referenced in the narratives were entered as nominal and the system automatically converts them to Real Terms.","benefits":2437.88,"benefitsNarrative":"Compared to financial year 24/25 Q4 the projects departmentally agreed Benefits 2,455.29m has increased to this years Benefits total £2,922.600m. This is due to a programme model change, which decreased from 30 years to 20 years. This is reflective of the current re-modelling, with the FBC now inclusive of the MMC figure which provides a justification to this change.","themes":["Cost & funding","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 the programme improved it's delivery confidence rating to Amber. This is primarily due to the following factors‚ the majority of projects within the programme have now been completed with the remainder due to be complete within the first half of the…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"DCMS_0118_2223-Q1","year":2025,"name":"Youth Investment Fund","department":"DCMS","category":"Infrastructure and Construction","description":"The Youth Investment Fund’s (YIF) objective is to create, expand and improve up to 300 local youth facilities and their services, in order to drive positive outcomes for young people, including improved mental and physical wellbeing, and skills for life and work. YIF is a commitment to young people to transform the out-of-school youth sector. It will provide truly innovative youth facilities in priority areas, and early-stage/seed resource funding to underpin them, enabling more positive activities that deliver improved outcomes and opportunities for young people.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ some projects not being complete by the 31/03/25. This has meant that the programme has been extended to 31/03/2026 and therefore the projects within our delivery pipeline are still on-going.","startDate":"2022-04-01","endDate":"2026-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2025 to 31/03/2026. This is primarily due to the following factors‚ some projects not completing by 31/03/2025 due to delays as a result of protracted legal due diligence activities, time lost on construction sites as a result of poor weather/ground conditions and over optimism on the behalf of grantees and the sub-contractors with their scheduling.","fyBaseline":234.62,"fyForecast":225.71,"fyVariance":3.8,"varianceNarrative":"The budget variance is less than or equal to 5%. The in-year variance for 2024/25 was 16.6% (£175m actual spend against post-Supps 2023 budget of £210m). Budget was re-profiled into 2025/26 through the updated FBC with no significant impact on the overall budget. We remain within the FBC envelope","wholeLifeCost":310.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 310. This is primarily due to the following factors‚ in-year variance relating to slippage of some projects rather than genuine underspends. The projects will be completed to the same overall budget, but in 2025/26 rather than 2024/25 with the programme's lifecycle extended accordingly.","benefits":4094.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) decreased from 4094 to 2434.5. This is primarily due to the following factors‚ a change in the benefits model, which decreased the measurement period from 30 years to 20 years. Next quarter's data will include an updated figure to include the recently included MMC portfolio.","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ some projects not being complete by the 31/03/25. This has meant that the programme has been extended to 31/03/2026 and therefore the projects within our delivery…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":null,"attentionScore":20,"attentionReasons":["Current published delivery confidence is Amber","In-year forecast variance is +5.7%"]},{"id":"MOJ_0050_2021-Q1","year":2026,"name":"10k Additional Prison Places - New Build","department":"MOJ","category":"Infrastructure and Construction","description":"The New Build programme supports our 20,000 additional prison places commitment; its scope is to build four new prisons","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA Delivery Confidence Assessment rating at 25/26 Q4 remains at Amber. This is primarily due to the following factors, HMP Millsike delivered to time and budget. HMP Welland Oaks is in main construction and delivery is on track. The remaining two sites have not yet entered main works contract and carry delivery risks that are being actively managed","startDate":"2020-03-02","endDate":"2032-05-31","scheduleNarrative":"The project's end date remains scheduled to finish on 31/05/32. The project remains on track to deliver against the baseline schedule.","fyBaseline":388.91,"fyForecast":398.17,"fyVariance":2.38,"varianceNarrative":"The budget variance is equal to or less than 5%.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"This programme currently reports no monetised benefits. Due to the projected increasing prisons population, this programme focusses on increasing capacity and there are no monetised benefits to be claimed. The programme's other benefits are defined in the current baseline as: construction benefits and outcomes (capacity, modern methods of construction and sustainability); to enable an improvement in prisoner rehabilitation outcomes; and, during its construction, deliver local community benefits.​","themes":["Delivery & schedule","Cost & funding","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA Delivery Confidence Assessment rating at 25/26 Q4 remains at Amber. This is primarily due to the following factors, HMP Millsike delivered to time and budget. HMP Welland Oaks is in main construction and delivery is on track. The remaining two sites have not yet entered main works contract and carry delivery…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"MOJ_0050_2021-Q1","year":2021,"name":"10,000 Additional Prison Places","department":"MOJ","category":"Infrastructure and Construction","description":"The prison population is forecast to rise significantly during the 2020s and the department is bringing forward new prison places to accommodate new offenders. In August 2019 the Prime Minister announced �2.5bn of funding to deliver 10,000 additional prison places through the building of new prisons and expanding the prison estate. The New Prisons projects form part of the 10,000 Additional Prison Places Programme and its scope is to build four new prisons (of up to c.1,700 places each).","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber/red.This is primarily due to the following factors: The project is making good progress; however, it is working to an ambitious timeline and successful delivery is dependent on several factors that are outside of the project's direct control. The need to secure planning permission for three new sites is the principal risk impacting delivery confidence. Engagement and consultation with local communities is either planned or underway to help build support for planned development and delivery confidence is expected to improve in the next period.","startDate":"2020-03-02","endDate":"2027-03-30","scheduleNarrative":"The project end-date is 30 March 2027. This is primarily due to the following factors: The Project is on track to deliver within committed timeframe, although significant risks remain such as the duration of the planning process. The dates were estimated based on early assumptions and will be refined further in the full business case.","fyBaseline":8.68,"fyForecast":11.06,"fyVariance":27.0,"varianceNarrative":"The budget variance exceeds 5%. The increase in expenditure in-year reflects an acceleration of planned activity. The project is forecast to remain within its overall whole life costs.","wholeLifeCost":25596.47,"costNarrative":"The projects Baseline Whole Life Cost is �25596.47m. This is primarily due to the following factors: The baseline is an estimate of the cost of building and then operating and maintaining the four prisons over their estimated 60-year lives. This baseline estimate is based on the project's Outline Business Case and will be updated pending approval of a Full Business Case.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber/red.This is primarily due to the following factors: The project is making good progress; however, it is working to an ambitious timeline and successful delivery is dependent on several factors that are outside of the project's direct control. The need to secure planning…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21"},{"id":"MOJ_0050_2021-Q1","year":2022,"name":"10,000 Additional Prison Places","department":"MOJ","category":"Infrastructure and Construction","description":"The prison population is forecast to rise significantly during the 2020s, and projected demand will soon outstrip supply. There is therefore a need to increase prison capacity. In August 2019, the Prime Minister announced that £2.5bn would be made available to deliver 10,000 additional prison places through the building of new prisons and expanding the prison estate. This has since been amended to £3.8bn, the New Prisons projects now form part of the 20,000 Additional Prison Places commitment; its scope is to build four new prisons (of up to 1,680 places each).","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 decreased from Amber/red to Amber This is primarily due to contingency planning that should enable the project to deliver within the baseline cost and schedule, except for one site. The project has had a number of risks recently realised including planning refusal at two sites. An appeal has been submitted on the first of these refusals and the project have been rapidly developing a contingency site in anticipation of the second refusal.","startDate":"2020-03-02","endDate":"2027-03-30","scheduleNarrative":"Compared to 20/21 Q4, the project end date has remained static.","fyBaseline":50.34,"fyForecast":48.91,"fyVariance":-3.0,"varianceNarrative":"The in year variance is below or equal to 5% so no narrative is required.","wholeLifeCost":32614.0,"costNarrative":"Compared to2021-Q4, the projects Baseline Whole Life Cost increased from 25596.47 (£m) to 32614.13 (£m). This is primarily due to the following factors: An increase in operational costs (which have now been profiled over a sixty year period) being revised in the Full Business Case.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 decreased from Amber/red to Amber This is primarily due to contingency planning that should enable the project to deliver within the baseline cost and schedule, except for one site. The project has had a number of risks recently…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"MOJ_0050_2021-Q1","year":2023,"name":"10k Additional Prison Places - New Build","department":"MOJ","category":"Infrastructure and Construction","description":"The New Build project supports our 20,000 additional prison places commitment; its scope is to build four new prisons.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. Compared to21/22 Q4, theproject'sDelivery Confidence Assessment rating remained Amber.The Amber assessment is due to planning permission refusals atthree of the new prison sites which are subject to planning appeals.There has been positive progress building the third of our new prisons (Full Sutton).(The main works contract was executed on 21 July 2022 following which construction commenced in August 2022 and delivery is on track).","startDate":"2020-03-02","endDate":null,"scheduleNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","fyBaseline":230.27,"fyForecast":221.0,"fyVariance":-4.0,"varianceNarrative":"Variance less than 5% so no narrative required","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This project currently reports no monetised benefits. This programme's primary benefit relates to increasing capacity due to the projected rise in prison population as opposed to monetised benefits.The programme's other benefits are defined in the current baseline as: construction benefits and outcomes (capacity, modern methods of construction and sustainability); to enable an improvement in prisoner rehabilitation outcomes; and, during its construction, deliver local community benefits.","themes":["Commercial & supply chain","Delivery & schedule","Cost & funding"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. Compared to21/22 Q4, theproject'sDelivery Confidence Assessment rating remained Amber.The Amber assessment is due to planning permission refusals atthree of the new…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"MOJ_0050_2021-Q1","year":2024,"name":"10k Additional Prison Places - New Build","department":"MOJ","category":"Infrastructure and Construction","description":"The New Build project supports our 20,000 additional prison places commitment; its scope is to build four new prisons.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. One of the four new prisons, HMP Millsike is on track to deliver as expected. Outline planning permission has been received for two sites and the final site remains to secure planning permission.","startDate":"2020-03-02","endDate":null,"scheduleNarrative":"Exempt under Section 22 of the Freedom of Information Act 2000 (Information intended for future publication)","fyBaseline":805.3,"fyForecast":309.86,"fyVariance":-62.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The underspend is due to delays in receiving planning permission at three sites.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":0.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 0m. This project currently reports no monetised benefits. This programme's primary benefit relates to increasing capacity due to the projected rise in prison population as opposed to monetised benefits.The programme's other benefits are defined in the current baseline as: construction benefits and outcomes (capacity, modern methods of construction and sustainability); to enable an improvement in prisoner rehabilitation outcomes; and, during its construction, deliver local community benefits.","themes":["Commercial & supply chain","Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. One of the four new prisons, HMP Millsike is on track to deliver as expected. Outline planning permission has been received for two sites and the final site remains…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"MOJ_0050_2021-Q1","year":2025,"name":"10k Additional Prison Places - New Build","department":"MoJ","category":"Infrastructure and Construction","description":"The New Build project supports our 20,000 additional prison places commitment; its scope is to build four new prisons.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ One of the four new prisons, HMP Millsike is on track to deliver on schedule. Either Full or Outline planning permission has been secured for the other sites, however timeline risks remain.","startDate":"2020-03-02","endDate":"2032-05-31","scheduleNarrative":"The project's end-date at 24/25-Q4 is scheduled to be 31/05/2032. This is primarily due to the following factors‚ Planning permission delays at three sites.","fyBaseline":840.85,"fyForecast":182.8,"fyVariance":78.26,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The underspend is due to delays in receiving planning permission at three sites.","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ This project currently reports no monetised benefits. Due to the projected increasing prisons population, this project focusses on increasing capacity and there are no monetised benefits to be claimed. The programme's other benefits are defined in the current baseline as: construction benefits and outcomes (capacity, modern methods of construction and sustainability); to enable an improvement in prisoner rehabilitation outcomes; and, during its construction, deliver local community benefits.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ One of the four new prisons, HMP Millsike is on track to deliver on schedule. Either Full or Outline planning permission has been secured for the other sites, however…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"MOJ_0050_2021-Q1","year":2026,"name":"10k Additional Prison Places - New Build","department":"MOJ","category":"Infrastructure and Construction","description":"The New Build programme supports our 20,000 additional prison places commitment; its scope is to build four new prisons","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA Delivery Confidence Assessment rating at 25/26 Q4 remains at Amber. This is primarily due to the following factors, HMP Millsike delivered to time and budget. HMP Welland Oaks is in main construction and delivery is on track. The remaining two sites have not yet entered main works contract and carry delivery risks that are being actively managed","startDate":"2020-03-02","endDate":"2032-05-31","scheduleNarrative":"The project's end date remains scheduled to finish on 31/05/32. The project remains on track to deliver against the baseline schedule.","fyBaseline":388.91,"fyForecast":398.17,"fyVariance":2.38,"varianceNarrative":"The budget variance is equal to or less than 5%.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"This programme currently reports no monetised benefits. Due to the projected increasing prisons population, this programme focusses on increasing capacity and there are no monetised benefits to be claimed. The programme's other benefits are defined in the current baseline as: construction benefits and outcomes (capacity, modern methods of construction and sustainability); to enable an improvement in prisoner rehabilitation outcomes; and, during its construction, deliver local community benefits.​","themes":["Delivery & schedule","Cost & funding","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA Delivery Confidence Assessment rating at 25/26 Q4 remains at Amber. This is primarily due to the following factors, HMP Millsike delivered to time and budget. HMP Welland Oaks is in main construction and delivery is on track. The remaining two sites have not yet entered main works contract and carry delivery…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"MOJ_0050_2021-Q1","year":2025,"name":"10k Additional Prison Places - New Build","department":"MoJ","category":"Infrastructure and Construction","description":"The New Build project supports our 20,000 additional prison places commitment; its scope is to build four new prisons.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ One of the four new prisons, HMP Millsike is on track to deliver on schedule. Either Full or Outline planning permission has been secured for the other sites, however timeline risks remain.","startDate":"2020-03-02","endDate":"2032-05-31","scheduleNarrative":"The project's end-date at 24/25-Q4 is scheduled to be 31/05/2032. This is primarily due to the following factors‚ Planning permission delays at three sites.","fyBaseline":840.85,"fyForecast":182.8,"fyVariance":78.26,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The underspend is due to delays in receiving planning permission at three sites.","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ This project currently reports no monetised benefits. Due to the projected increasing prisons population, this project focusses on increasing capacity and there are no monetised benefits to be claimed. The programme's other benefits are defined in the current baseline as: construction benefits and outcomes (capacity, modern methods of construction and sustainability); to enable an improvement in prisoner rehabilitation outcomes; and, during its construction, deliver local community benefits.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ One of the four new prisons, HMP Millsike is on track to deliver on schedule. Either Full or Outline planning permission has been secured for the other sites, however…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":0,"attentionScore":18,"attentionReasons":["Current published delivery confidence is Amber"]},{"id":"DFT_0047_2021-Q3","year":2026,"name":"A66 Northern Trans-Pennine","department":"DFT","category":"Infrastructure and Construction","description":"Upgrading the remaining six single carriageway sections of the A66 between the A1(M) at Scotch Corner and the M6 at Penrith, creating a continuous dual carriageway across the Pennines, including key junction upgrades","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber.","startDate":"2017-07-05","endDate":"2026-11-01","scheduleNarrative":"Exempt under Section 22 - Information intended for future publication","fyBaseline":81.34,"fyForecast":81.34,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":467.23,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 remained unchanged. Please note that a known technical issue within NISTA means the benefits reported here differ from those submitted to NISTA.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. Exempt under Section 22 - Information intended for future publication","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"DFT_0047_2021-Q3","year":2021,"name":"A66 Northern Trans-Pennine","department":"DFT","category":"Infrastructure and Construction","description":"Dualling of the remaining single-carriageway sections on the A66 between M6 J40 Penrith and A1M Scotch Corner, creating a continuous dual carriageway across the Pennines.","ipaDca":"Green","sroDca":null,"deliveryConfidence":"Green","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Green.This is primarily due to the following factors: The programme and costs have been re-baselined in line with the accelerated timetable approved by HM Treasury. Construction is now scheduled to start in 2024 and take 5 years, with the road therefore opening to traffic in 2029. In March 2021 HM Treasury approved the full accelerated Development Phase budget. The project is currently well within all the elements of the set baseline. Note: There are 10 requirements to achieve acceleration, including a progressive assurance approach which has been discussed and agreed with IPA for Outline Business Case (Project Assurance Review) and Full Business Case (Independent Assurance Review Gate 3)","startDate":"2017-07-05","endDate":"2030-03-31","scheduleNarrative":"The project end-date is 31 March 2030. This is primarily due to the following factors: The schedule was re-baselined to achieve the accelerated position to commence construction work in 2024 with a construction period of 5 years, as per agreement from HM Treasury. All milestones are currently forecast to be met","fyBaseline":13.72,"fyForecast":13.72,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":1289.4,"costNarrative":"The projects Baseline Whole Life Cost is �1289.40m. This is primarily due to the following factors: The whole life cost is based on the latest funding position a for the 5 year construction length with a start of works in 2024. All figures are based on 2019 base prices undiscounted but including inflation, portfolio risk and non-recoverable VAT.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Governance & assurance","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Green.This is primarily due to the following factors: The programme and costs have been re-baselined in line with the accelerated timetable approved by HM Treasury. Construction is now scheduled to start in 2024 and take 5 years, with the road therefore opening to traffic in…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21"},{"id":"DFT_0047_2021-Q3","year":2022,"name":"A66 Northern Trans-Pennine","department":"DFT","category":"Infrastructure and Construction","description":"Dualling of the remaining single-carriageway sections on the A66 between M6 J40 Penrith and A1M Scotch Corner, creating a continuous dual carriageway across the Pennines.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 increased from Green to Amber. Compared to financial year 20/21-Q4, National Highways project team rating at 21/22-Q4 has moved from Green to Amber, which aligns to IPA's assessment. The project is moving at pace and has undertaken extensive statutory consultation. There is general support for the scheme and the overall sentiment is positive at a local, regional and national level. The Decision Consent Order (DCO) submission is in its final stages of preparation; it is undergoing assurance through Legal and DCO Readiness Reviews, with actions identified being progressed to make it robust and ready for acceptance. Despite a DCO submission and scheme that adheres to policy, and responds to stakeholder feedback, there is a risk of challenge to the DCO.","startDate":"2017-07-05","endDate":"2030-03-31","scheduleNarrative":"Compared to 2021-Q4, your project end-date remained scheduled to finish on 31 MAR 2030 . This is primarily due to the following factors: The committed milestones of Start of Work (SoW) (Q4 23/24) and forecast Open for Traffic (OfT) (Q4 28/29) are still on target. Statutory Consultation milestone has been met on the 24th of September 21 and ended 6th November 2021. Non-statutory targeted engagement has been undertaken in February and March 2022 and DCO is on target for submission in May 2022. The Amber assessment accounts for the fact that some float has been used by moving the DCO submission from February 22 to May 22 (although SoW and OfT dates remain the same). However, the risk of challenge or non-acceptance to DCO will impact on programme and put the committed milestones of SoW and OfT at risk.","fyBaseline":27.17,"fyForecast":42.3,"fyVariance":56.0,"varianceNarrative":"Opportunity has been taken to bring forward work from future Project Control Framework (PCF) stages to de-risk the accelerated Start of Work date and inform the preliminary design taken to DCO. This enable a more robust design to be presented. This work includes:- - More detailed and extensive archaeological surveys - More detailed and extensive ground investigation work - Full topographically survey - Engagement with the Design and Build Contractors (DIPs) via early orders to set strategies and enable detailed planning of the construction phase. Work has also been undertaken to ensure an Affordable, Buildable, Consentable and Defendable design is presented at DCO. This has involved some re-optioneering work to mitigate some of the emerging risks. Lands spend has been brought forward as more blight claims have been processed in year than originally anticipated and as a result of the work noted above there has been additional spend associated with compensation payments for land access for surveys.","wholeLifeCost":1140.0,"costNarrative":"Compared to 2021-Q4, the projects Baseline Whole Life Cost decreased from 1289.40 (£m) to 1140.22 (£m). This is primarily due to the following factors: The whole life cost (£1,140m) is based on the stage 2 assured estimate which is yet to reflect the impact of statutory consultation. This value is below the value agreed at the time of acceleration £1,289m (December 2020) and is informed by a more mature design position that reflects the refreshed Outline business Case (OBC) approved in Summer 21. Given that the project is still in the process of finalising design following statutory consultation, a cost trigger point based on £1,140m+ 10% tolerance has been noted at IPDC in Summer 2021, at £1,254m. A final stage 3 estimate is due to inform the 22/23 Q1 report.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Scope & requirements","Approvals & decisions","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 increased from Green to Amber. Compared to financial year 20/21-Q4, National Highways project team rating at 21/22-Q4 has moved from Green to Amber, which aligns to IPA's assessment. The project is moving at pace and has undertaken…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"DFT_0047_2021-Q3","year":2023,"name":"A66 Northern Trans-Pennine","department":"DFT","category":"Infrastructure and Construction","description":"Dualling of the remaining single-carriageway sections on the A66 between M6 J40 Penrith and A1M Scotch Corner, creating a continuous dual carriageway across the Pennines.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber (SRO rating). This is primarily due to the following factors. An Action Plan has been put in place to address the five actions from the last Assurance Review, and progress is monitored on a monthly basis. The next the IPA Assurance Review (scheduled for July 2023) will formally review progress against the Action Plan.","startDate":"2017-07-05","endDate":"2030-03-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2030-03-31. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2030-03-31. This is primarily due to the following factors. The committed milestones of Start of Work in Q4 23/24 and Open for Traffic in Road Investment Period 3 are still on track. Over the course of Financial Year 22/23, the project has achieved a number of important milestones, including Development Consent Order Submission (June 2022), National Highways Project Controls Framework Stage 3 completion (June 2022), contract award with the Delivery Integration Partners (October 2022), and the commencement of the Development Consent Order Examination in November 2022.","fyBaseline":68.8,"fyForecast":66.76,"fyVariance":-3.0,"varianceNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":692.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 692m. The baseline monetised benefits reflect the June 2022 DfT Investment Committee (IPDC) approved position. A value for money remediation plan is being implemented. This information will be presented in the Full Business Case.","themes":["Delivery & schedule","Governance & assurance","Commercial & supply chain","Cost & funding"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber (SRO rating). This is primarily due to the following factors. An Action Plan has been put in place to address the five actions from the last Assurance Review, and progress is monitored on a monthly basis. The next the IPA Assurance Review (scheduled…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"DFT_0047_2021-Q3","year":2024,"name":"A66 Northern Trans-Pennine","department":"DFT","category":"Infrastructure and Construction","description":"Upgrading the remaining six single carriageway sections of the A66 between the A1(M) at Scotch Corner and the M6 at Penrith, creating a continuous dual carriageway across the Pennines, including key junction upgrades","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. Actions arising from the last Assurance Review have been completed. The next IPA Assurance Review will be to support the Full Business Case ahead of Start of Works and will formally review progress against the actions.","startDate":"2017-07-05","endDate":"2030-03-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2030-03-31. This is primarily due to the following factors. Over the course of Financial Year 23/24, the project has achieved the important milestone of receiving Secretary of State approval to the Development Consent Order (DCO) on the 7 March 2024.","fyBaseline":112.47,"fyForecast":112.47,"fyVariance":0.0,"varianceNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":692.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 692m. The project's departmental-agree monetised benefits at 22/23-Q4 is 692m. The baseline monetised benefits reflect the June 2022 DfT Investment Committee (IPDC) approved position. The Full Business Case will include confirmation of the project's value for money.","themes":["Governance & assurance","Commercial & supply chain","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. Actions arising from the last Assurance Review have been completed. The next IPA Assurance Review will be to support the Full Business Case ahead of Start of Works and will…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"DFT_0047_2021-Q3","year":2025,"name":"A66","department":"DfT","category":"Infrastructure and Construction","description":"Upgrading the remaining six single carriageway sections of the A66 between the A1(M) at Scotch Corner and the M6 at Penrith, creating a continuous dual carriageway across the Pennines, including key junction upgrades.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. Actions arising from the last Assurance Review have been completed. The next NISTA Assurance Review will be to support the Full Business Case ahead of Start of Works and will formally review progress against the actions.","startDate":"2017-07-05","endDate":null,"scheduleNarrative":"Project development continued, with enabling works on site. Delivery subject to 2025 Spending Review.","fyBaseline":85.5,"fyForecast":85.5,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":793.59,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 692 to 793. Quantified benefits for the project have been updated to reflect latest guidance and were reported to IPDC in January 2024.","themes":["Governance & assurance","Delivery & schedule","Approvals & decisions","Cost & funding"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. Actions arising from the last Assurance Review have been completed. The next NISTA Assurance Review will be to support the Full Business Case ahead of Start of Works and will formally review progress against the…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"DFT_0047_2021-Q3","year":2026,"name":"A66 Northern Trans-Pennine","department":"DFT","category":"Infrastructure and Construction","description":"Upgrading the remaining six single carriageway sections of the A66 between the A1(M) at Scotch Corner and the M6 at Penrith, creating a continuous dual carriageway across the Pennines, including key junction upgrades","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber.","startDate":"2017-07-05","endDate":"2026-11-01","scheduleNarrative":"Exempt under Section 22 - Information intended for future publication","fyBaseline":81.34,"fyForecast":81.34,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":467.23,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 remained unchanged. Please note that a known technical issue within NISTA means the benefits reported here differ from those submitted to NISTA.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. Exempt under Section 22 - Information intended for future publication","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"DFT_0047_2021-Q3","year":2025,"name":"A66","department":"DfT","category":"Infrastructure and Construction","description":"Upgrading the remaining six single carriageway sections of the A66 between the A1(M) at Scotch Corner and the M6 at Penrith, creating a continuous dual carriageway across the Pennines, including key junction upgrades.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. Actions arising from the last Assurance Review have been completed. The next NISTA Assurance Review will be to support the Full Business Case ahead of Start of Works and will formally review progress against the actions.","startDate":"2017-07-05","endDate":null,"scheduleNarrative":"Project development continued, with enabling works on site. Delivery subject to 2025 Spending Review.","fyBaseline":85.5,"fyForecast":85.5,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":793.59,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 692 to 793. Quantified benefits for the project have been updated to reflect latest guidance and were reported to IPDC in January 2024.","themes":["Governance & assurance","Delivery & schedule","Approvals & decisions","Cost & funding"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. Actions arising from the last Assurance Review have been completed. The next NISTA Assurance Review will be to support the Full Business Case ahead of Start of Works and will formally review progress against the…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":null,"attentionScore":18,"attentionReasons":["Current published delivery confidence is Amber"]},{"id":"DLUHC_0138_2223-Q1","year":2026,"name":"Affordable Homes Programme (AHP)","department":"MHCLG","category":"Infrastructure and Construction","description":"The Affordable Homes Programme (AHP) is the grant funding vehicle used by Government for the delivery of social and affordable housing in England. It allocates grant funding to Registered Providers of social housing to help support the capital costs of developing affordable housing for rent or sale. In 2023, revised targets were agreed with the delivery agencies which re-baselined the Programme to a new delivery range of 110,000-130,000; this was announced in 2024.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. Following the data received from agencies, we have now reached at least the lower end of the overall target range of 110,000-130,000 homes. We expect a further c.10,000 housing starts with deadline extensions to follow in 26/27. While the GLA did not meet its 2021–26 target, it remains confident that delivery will increase under the extended timetable. This confidence is supported by its 2025/26 performance, which saw the highest number of starts delivered in the programme to date.","startDate":"2021-01-03","endDate":"2030-03-31","scheduleNarrative":"There has been no change to the schedule for the programme.","fyBaseline":3168.01,"fyForecast":3168.01,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":12230.5,"costNarrative":"The WLC remains the same. There has been a minor variance in year by year budgets following business planning outcomes in the department. We intend for the programme to spend to its full budget.","benefits":16559.67,"benefitsNarrative":"These benefits consist of increased housing supply from the construction of new social and affordable units (measured by Land Value Uplift), distributional benefits and wider fiscal impacts.","themes":["Delivery & schedule","Cost & funding","Governance & assurance","Technical & integration"],"evidenceExcerpt":"The SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. Following the data received from agencies, we have now reached at least the lower end of the overall target range of 110,000-130,000 homes. We expect a further c.10,000 housing starts with deadline extensions to follow in 26/27. While the GLA did not meet its 2021–26 target,…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"DLUHC_0138_2223-Q1","year":2023,"name":"Affordable Homes Programme","department":"DLUHC","category":"Infrastructure and Construction","description":"The Affordable Homes Programme (AHP) is one of the primary vehicles used by Government for the delivery of affordable housing in England. It allocates grant funding to Local Authorities (LAs) and Housing Associations (HAs) to help support the capital costs of developing affordable housing for rent or sale.The AHP operates with a budget of 11.5bn, delivering tens of thousands of homes across England for both rent and sale.Delivery of the programme is delegated to our delivery partners, Homes England (HE) and the Greater London Authority (GLA). Our delivery partners have full delegated responsibility to make spending and allocation decisions in line with their targets, agreed assessment criteria, and within predetermined delegation limits.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 is Amber. This is primarily due to the following factors. The programmes delivery confidence is currently rated as amber. This reflects the risk that the programme will be unable to deliver the commitments in the original business case because of changes in the wider economy (primarily high inflation), and pressures on the finances of social housing providers. In Quarter 4, the programme gained agreement, through a revised business case, to re-baseline the programmes delivery, spend profiles and final targets, with contracts with providers being renegotiated to align with that. This is due to complete in late Spring.","startDate":"2021-01-03","endDate":"2029-04-30","scheduleNarrative":"The project's end-date at 22/23-Q4 is 2029-04-30. This is primarily due to the following factors. In Quarter 4, the programme gained agreement to a revised business case for a re-baselined programme of delivery, and contracts with providers are being renegotiated to align to that new agreed position. Once completed, the programme expects to be back on track to deliver updated targets within the original schedule, and the Programme is set to be rated as green in delivery confidence. The re-negotiation of contracts is due to complete in late Spring.","fyBaseline":1895.17,"fyForecast":1114.36,"fyVariance":-41.0,"varianceNarrative":"The Affordable Homes Programme has delivered c. 4,400 fewer starts on site than originally forecast this year, leading to less capital spend than planned. This is primary due to changes in the wider economy and environment for social housing landlords impacting providers ability to fund new development. The programme is currently in the process of re-negotiating contracts with providers in order to address the additional costs, as a result of changes to the economy. It is expected that some of the lost delivery is re-forecast and planned in future years, but some may fall away completely. The re-negotiation of contracts is due to complete in late Spring.","wholeLifeCost":11583.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 22/23-Q4 is 11583m. This is primarily due to the following factors. Whole life costs for the programme have remained the same as last year, however overall delivery will fall short of the original business case. This is primarily due to high inflation impacting the costs of building new development. The grant assumptions made in 2020 will no longer support the level of delivery expected at the time. Since then, the programme has gained agreement for a revised, re-baselined business case and contracts with providers are being renegotiated to align with that. Once complete, the programme is expecting to be rated as green for delivery confidence.","benefits":20796.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 20796m. The project's departmental-agree monetised benefits at 22/23-Q4 is 20796m. The estimated benefits arising from the Affordable Homes Programmes delivery in 2022/23 are valued at around 165 million. This is based on having delivered 4,000 homes in the 2022/23 financial year, the same figure assumed in the January baseline and business case assumptions on benefits per unit. The vast majority of the benefits delivered this financial year are wider societal benefits and are derived from the net private benefits of building new homes which the department monetises using the Land Value Uplift (LVU) framework, as per DLUHCs appraisal guide.","themes":["Delivery & schedule","Approvals & decisions","Cost & funding","Commercial & supply chain"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 is Amber. This is primarily due to the following factors. The programmes delivery confidence is currently rated as amber. This reflects the risk that the programme will be unable to deliver the commitments in the original business case because of changes in the wider…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"DLUHC_0138_2223-Q1","year":2024,"name":"Affordable Homes Programme","department":"DLUHC","category":"Infrastructure and Construction","description":"The Affordable Homes Programme (AHP) allocates grant funding to Local Authorities and Housing Associations to help support the capital costs of developing affordable housing for rent or sale.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 22/23-Q4, the Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber(SRO rating). This is primarily due to the following factors. As at March 24: We continue to assess the delivery confidence of the programme as amber. _x000D_ _x000D_ The programme continues to implement flexibilities to address cost pressures facing the sector.","startDate":"2021-01-03","endDate":"2029-04-30","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2029-04-30. This is primarily due to the following factors. As at March 24: The project's end-date is April 2029.","fyBaseline":2792.17,"fyForecast":2252.65,"fyVariance":-19.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The cost profile was re-baselined in 2023.","wholeLifeCost":11609.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 increased from 11583m. to 11609m. This is primarily due to the following factors. The whole life cost increased from 11583m to 11609m as a result of a small increase in resource costs due to increased commercial and legal fees. Capital costs have remained fixed.","benefits":20796.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 20796m. Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 20796m.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber(SRO rating). This is primarily due to the following factors. As at March 24: We continue to assess the delivery confidence of the programme as amber. _x000D_ _x000D_ The programme continues to implement flexibilities to address cost pressures facing…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"DLUHC_0138_2223-Q1","year":2025,"name":"Affordable Homes Programme (AHP)","department":"MHCLG","category":"Infrastructure and Construction","description":"The Affordable Homes Programme (AHP) allocates grant funding to Local Authorities and Housing Associations to help support the capital costs of developing affordable housing for rent or sale.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. We assess delivery confidence for the programme as Amber. The Affordable Homes Programme (21-26) is still on track to meet its overall target of delivering 110,000-130,000 homes, and received top ups of £800 million in the last year on top of the original £11.5 billion budget. The programme is still on track to meet its overall target, although in May the Greater London Authority announced a reduction in their targets for the Affordable Homes Programme (21-26). This target has now been reduced to 17,800-19,000 homes down from 23,900 – 27,200 for their original programme budget.","startDate":"2021-04-01","endDate":null,"scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 30/04/2029 to 31/03/2030. The project end date has changed. In July 2024 we agreed with the Greater London Authority an extension to the completions deadline to March 2030.","fyBaseline":2792.17,"fyForecast":2933.2,"fyVariance":5.05,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":12337.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 11,537 to 12,337. This programme has received £800m in top up funding which has led to an increase in our baseline WLC. We have a public commitment that this top up will deliver up to 7,800 additional affordable homes.","benefits":20796.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 20796. We are expecting a change to the baseline benefits once we have consolidated delivery changes into a revised business case.","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. We assess delivery confidence for the programme as Amber. The Affordable Homes Programme (21-26) is still on track to meet its overall target of delivering 110,000-130,000 homes, and received top ups of £800…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"DLUHC_0138_2223-Q1","year":2026,"name":"Affordable Homes Programme (AHP)","department":"MHCLG","category":"Infrastructure and Construction","description":"The Affordable Homes Programme (AHP) is the grant funding vehicle used by Government for the delivery of social and affordable housing in England. It allocates grant funding to Registered Providers of social housing to help support the capital costs of developing affordable housing for rent or sale. In 2023, revised targets were agreed with the delivery agencies which re-baselined the Programme to a new delivery range of 110,000-130,000; this was announced in 2024.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. Following the data received from agencies, we have now reached at least the lower end of the overall target range of 110,000-130,000 homes. We expect a further c.10,000 housing starts with deadline extensions to follow in 26/27. While the GLA did not meet its 2021–26 target, it remains confident that delivery will increase under the extended timetable. This confidence is supported by its 2025/26 performance, which saw the highest number of starts delivered in the programme to date.","startDate":"2021-01-03","endDate":"2030-03-31","scheduleNarrative":"There has been no change to the schedule for the programme.","fyBaseline":3168.01,"fyForecast":3168.01,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":12230.5,"costNarrative":"The WLC remains the same. There has been a minor variance in year by year budgets following business planning outcomes in the department. We intend for the programme to spend to its full budget.","benefits":16559.67,"benefitsNarrative":"These benefits consist of increased housing supply from the construction of new social and affordable units (measured by Land Value Uplift), distributional benefits and wider fiscal impacts.","themes":["Delivery & schedule","Cost & funding","Governance & assurance","Technical & integration"],"evidenceExcerpt":"The SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. Following the data received from agencies, we have now reached at least the lower end of the overall target range of 110,000-130,000 homes. We expect a further c.10,000 housing starts with deadline extensions to follow in 26/27. While the GLA did not meet its 2021–26 target,…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"DLUHC_0138_2223-Q1","year":2025,"name":"Affordable Homes Programme (AHP)","department":"MHCLG","category":"Infrastructure and Construction","description":"The Affordable Homes Programme (AHP) allocates grant funding to Local Authorities and Housing Associations to help support the capital costs of developing affordable housing for rent or sale.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. We assess delivery confidence for the programme as Amber. The Affordable Homes Programme (21-26) is still on track to meet its overall target of delivering 110,000-130,000 homes, and received top ups of £800 million in the last year on top of the original £11.5 billion budget. The programme is still on track to meet its overall target, although in May the Greater London Authority announced a reduction in their targets for the Affordable Homes Programme (21-26). This target has now been reduced to 17,800-19,000 homes down from 23,900 – 27,200 for their original programme budget.","startDate":"2021-04-01","endDate":null,"scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 30/04/2029 to 31/03/2030. The project end date has changed. In July 2024 we agreed with the Greater London Authority an extension to the completions deadline to March 2030.","fyBaseline":2792.17,"fyForecast":2933.2,"fyVariance":5.05,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":12337.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 11,537 to 12,337. This programme has received £800m in top up funding which has led to an increase in our baseline WLC. We have a public commitment that this top up will deliver up to 7,800 additional affordable homes.","benefits":20796.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 20796. We are expecting a change to the baseline benefits once we have consolidated delivery changes into a revised business case.","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. We assess delivery confidence for the programme as Amber. The Affordable Homes Programme (21-26) is still on track to meet its overall target of delivering 110,000-130,000 homes, and received top ups of £800…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":null,"attentionScore":18,"attentionReasons":["Current published delivery confidence is Amber"]},{"id":"DEFRA_0349_2324-Q4","year":2026,"name":"Cefas Infrastructure to Support Future Delivery at Sea","department":"DEFRA","category":"Government Transformation and Service Delivery","description":"The Research Vessel (RV) Cefas Endeavour is due to come to the end of its planned design life in 2033. The project is at Outline Business Case and is seeking investment a for Preferred Option new RV with enhanced capability to continue our national critical data collection at sea activities for Defra and the UK Government, which includes sustainable fisheries, offshore energy, nature recovery, environmental regulation and emergency response. Our vision is to replace Endeavour with a modern, multi-disciplinary RV that enhances scientific capability (with additional deep and shallow water capability allowing for a delivery across a wider range of government departments), embraces emerging marine autonomous technologies (through a flexible ship design), supports net zero goals (dual fuel engines are capable of operating on future green technology as their technology readiness levels develop). Investment will also deliver key government missions to protect and restore nature, support national security and resilience and drive economic growth.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The SRO Delivery Confidence Assessment for the project at FY25/26 Q4 remains Amber. This reflects ongoing discussions to secure the necessary investment for the Preferred Option and reflect the status as at March 2025.","startDate":null,"endDate":null,"scheduleNarrative":"Compared to financial year 24/25-Q4, the project's planned end-date at 25/26-Q4 remained the same, reflecting the planned end of the design life of the current Cefas RV.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"","wholeLifeCost":152.89,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (at OBC and measured in £m) remained at £305m.","benefits":961.79,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (at OBC and measured in £m) remained at £1,748m.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Scope & requirements"],"evidenceExcerpt":"The SRO Delivery Confidence Assessment for the project at FY25/26 Q4 remains Amber. This reflects ongoing discussions to secure the necessary investment for the Preferred Option and reflect the status as at March 2025. Compared to financial year 24/25-Q4, the project's planned end-date at 25/26-Q4 remained the same, reflecting the planned end of the design…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"DEFRA_0349_2324-Q4","year":2025,"name":"Cefas Infrastructure to Support Future Delivery at Sea","department":"DEFRA","category":"Government Transformation and Service Delivery","description":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","startDate":"2022-04-01","endDate":null,"scheduleNarrative":"The project's end-date at 24/25-Q4 is scheduled to be 30/06/2031. This is primarily due to the following factors This timeline is based on likely durations that are in line with industry expectations for procuring, designing and building research vessels which can only commence once funding is confirmed, with project funding awaiting confirmation.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","wholeLifeCost":null,"costNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","benefits":null,"benefitsNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information The project's end-date at 24/25-Q4 is scheduled to be 30/06/2031. This is primarily due to the following factors This timeline is based on likely durations that are in line with industry expectations for procuring,…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"DEFRA_0349_2324-Q4","year":2026,"name":"Cefas Infrastructure to Support Future Delivery at Sea","department":"DEFRA","category":"Government Transformation and Service Delivery","description":"The Research Vessel (RV) Cefas Endeavour is due to come to the end of its planned design life in 2033. The project is at Outline Business Case and is seeking investment a for Preferred Option new RV with enhanced capability to continue our national critical data collection at sea activities for Defra and the UK Government, which includes sustainable fisheries, offshore energy, nature recovery, environmental regulation and emergency response. Our vision is to replace Endeavour with a modern, multi-disciplinary RV that enhances scientific capability (with additional deep and shallow water capability allowing for a delivery across a wider range of government departments), embraces emerging marine autonomous technologies (through a flexible ship design), supports net zero goals (dual fuel engines are capable of operating on future green technology as their technology readiness levels develop). Investment will also deliver key government missions to protect and restore nature, support national security and resilience and drive economic growth.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The SRO Delivery Confidence Assessment for the project at FY25/26 Q4 remains Amber. This reflects ongoing discussions to secure the necessary investment for the Preferred Option and reflect the status as at March 2025.","startDate":null,"endDate":null,"scheduleNarrative":"Compared to financial year 24/25-Q4, the project's planned end-date at 25/26-Q4 remained the same, reflecting the planned end of the design life of the current Cefas RV.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"","wholeLifeCost":152.89,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (at OBC and measured in £m) remained at £305m.","benefits":961.79,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (at OBC and measured in £m) remained at £1,748m.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Scope & requirements"],"evidenceExcerpt":"The SRO Delivery Confidence Assessment for the project at FY25/26 Q4 remains Amber. This reflects ongoing discussions to secure the necessary investment for the Preferred Option and reflect the status as at March 2025. Compared to financial year 24/25-Q4, the project's planned end-date at 25/26-Q4 remained the same, reflecting the planned end of the design…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"DEFRA_0349_2324-Q4","year":2025,"name":"Cefas Infrastructure to Support Future Delivery at Sea","department":"DEFRA","category":"Government Transformation and Service Delivery","description":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","startDate":"2022-04-01","endDate":null,"scheduleNarrative":"The project's end-date at 24/25-Q4 is scheduled to be 30/06/2031. This is primarily due to the following factors This timeline is based on likely durations that are in line with industry expectations for procuring, designing and building research vessels which can only commence once funding is confirmed, with project funding awaiting confirmation.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","wholeLifeCost":null,"costNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","benefits":null,"benefitsNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information The project's end-date at 24/25-Q4 is scheduled to be 30/06/2031. This is primarily due to the following factors This timeline is based on likely durations that are in line with industry expectations for procuring,…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":null,"transition":"Not comparable","endDateDeltaDays":null,"attentionScore":18,"attentionReasons":["Current published delivery confidence is Amber"]},{"id":"HO_0042_2021-Q3","year":2026,"name":"Cerberus","department":"HO","category":"Government Transformation and Service Delivery","description":"Cerberus is the Home Office programme to modernise how the UK border identifies risk in people and goods before they arrive and as they cross the border. It brings together data from multiple sources and uses analytics to help officers focus on the highest risk passengers, vehicles and freight, while allowing legitimate travel and trade to flow more smoothly. Cerberus supports both passenger and freight movements. Its current focus is on transforming air passenger targeting and improving risk assessment for roll on roll off freight, alongside strengthening data governance, system resilience and security. This supports the planned retirement of legacy systems that are costly to run and increasingly unreliable, reducing long term technology cost and operational risk. The overarching aim of Cerberus is to strengthen border security by improving the quality and timeliness of targeting decisions. It is designed to increase the detection of criminal activity such as organised immigration crime, smuggling and other high‑harm threats, while reducing unnecessary checks that disrupt the public and businesses. By providing better information to intelligence and operational teams, the programme supports more efficient use of resources and more effective interventions at the border and upstream. Looking ahead, Cerberus provides the digital foundation for a more data‑driven border. It is being delivered in stages, allowing the Home Office to stabilise delivery, learn from ongoing technology trials, and adapt future plans as evidence and operational insight develop.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained AMBER. This reflects a balanced position of continued delivery progress alongside the scale, complexity, and transition risks inherent in the programme’s next delivery phase. The programme has demonstrated improved delivery confidence over the last year through strengthened programme management, clearer ownership of the product backlog, and effective closure of critical recommendations from previous NISTA assurance activity. Delivery performance has stabilised, with Cerberus continuing to forecast delivery within its agreed cost, schedule, and quality parameters and evidencing more mature planning, governance, and risk management practices. The AMBER rating also reflects the scale and ambition of Cerberus as a Tier A GMPP programme, including complex data integration, operational dependency management, and transition from legacy systems. While delivery confidence has improved, residual risks remain around supplier transition, dependency management, and the coordination of business change alongside technical delivery. These risks are recognised and actively managed through strengthened governance, enhanced assurance, and closer collaboration between the programme team, Home Office Digital, and operational stakeholders. Overall, the maintained AMBER rating provides a fair and proportionate reflection of Cerberus’ improving delivery trajectory, while recognising the inherent complexity of delivering large‑scale, data‑enabled border security capabilities within a live operational environment.","startDate":"2019-12-31","endDate":"2030-03-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same. Despite earlier delivery challenges and the need to re sequence activity in response to technical, supplier and operational dependencies, the programme has remained focused on delivery. The revised delivery profile supports the completion of priority capability within a complex operating environment, while allowing for greater delivery confidence following programme stabilisation. The schedule continues to be driven by the need to complete critical passenger and goods targeting capabilities, including Air Passenger and RoRo delivery, which sit on the critical path to the decommissioning of legacy systems. Maintaining the existing end date has required re‑sequencing activity within the delivery plan to prioritise operational readiness, data quality, and assurance requirements, particularly where earlier phases identified the need to strengthen audit and controls before progressing further capability. In addition, the programme operates within a highly interdependent delivery environment, relying on upstream data pipelines, shared platforms, and alignment with wider Border Force and Home Office transformation activity. The schedule reflects these dependencies and is designed to minimise risk to frontline operations while ensuring Cerberus delivers a sustainable, multi‑modal targeting capability. Overall, retaining the previously published end‑date demonstrates that Cerberus has absorbed delivery complexity through re-planning and prioritisation rather than extending the programme timeline, while maintaining confidence in the achievability of the final end state.","fyBaseline":37.48,"fyForecast":38.75,"fyVariance":3.41,"varianceNarrative":"The budget variance is 5%, driven primarily by higher transition costs within CDEL arising from the transition from our current supplier to an in-house delivery capability led by HO Digital. A further element of the variance relates to Monitoring and Evaluation (M&E) activity, which represents an agreed pressure. The M&E work was a condition of the InvestCo arrangement and was not supported by a corresponding budget allocation, resulting in the remaining variance.","wholeLifeCost":285.1,"costNarrative":"Compared to financial year 24/25 Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) increased from £240.970m to £288.70m. This is primarily driven by higher transition costs resulting from the supplier change. Monitoring and Evaluation work as part of the InvesCo condition, and a review of run costs.","benefits":175.45,"benefitsNarrative":"Compared to FY 2024/25 Q4, the project’s departmentally agreed benefits at FY 2025/26 Q4 (measured in £) have remained stable. This reflects the continued maturity of the benefits baseline, with no material changes to agreed benefit assumptions during the period. This position is primarily due to the following factors - Benefits baseline stability. The departmentally agreed benefits baseline was confirmed and locked in FY 2024/25, with no material changes approved during the current reporting period. No material scope change There have been no significant changes to project scope that would materially increase or reduce the agreed benefits profile. Timing of benefits realisation. The majority of financial benefits remain scheduled for realisation in later phases of delivery, rather than within the FY 2025/26 Q4 reporting window. Assumptions unchanged. Key benefits assumptions (including volumes, behaviours, and dependency milestones) remain consistent with those previously approved through governance. Dependency alignment. Planned benefits remain dependent on the successful delivery and adoption of linked capabilities and operational changes, which are proceeding broadly as expected but have not yet triggered additional monetised benefits. No re profiling agreed. No re profiling or re valuation of benefits has been agreed through departmental governance during the period.","themes":["Delivery & schedule","Technical & integration","Cost & funding","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained AMBER. This reflects a balanced position of continued delivery progress alongside the scale, complexity, and transition risks inherent in the programme’s next delivery phase. The programme has demonstrated improved delivery confidence over the…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"HO_0042_2021-Q3","year":2021,"name":"Cerberus","department":"HO","category":"Government Transformation and Service Delivery","description":"Border Force is making a transformative change to its analytics and targeting capabilities, better securing the border with improved operational outcomes, driving operational efficiencies, and therefore achieving considerable cashable savings through the decommissioning of expensive legacy systems.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber.This is primarily due to the following factors: Delivery is progressing largely as planned using an agile methodology and to date has delivered a live capability that is in operational use, albeit in a limited capacity. The programme is carrying some resource, governance and technical delivery risks but this is unlikely to affect key deliverables or lead to a significant increase in cost. In fact, action being taken to address these issues are likely to mitigate future risk and potentially provide opportunities for cost savings. As a result some anticipated benefit realisation in 2021/22 is likely to be slowed and move into 2022/23 but the programme are not predicting an impact on the long-term benefits.","startDate":"2019-10-01","endDate":"2024-04-01","scheduleNarrative":"The project end-date is 01 April 2024. This is primarily due to the following factors: The programme is on track to be completed by the end of 2023/24. The timeline allows for the incremental delivery of data sets and targeting modes along with the underlying capabilities. This incremental approach to delivery allows for a steady and manageable change process which boosts feedback at each stage. This feedback can be thoroughly explored, and the agile working of the project means that changes required can be added into delivery plans. In addition, the timeline and sequencing of activities has been arranged to allow for the changes in technology and ways of working to land effectively and for the resulting capabilities to be fully leveraged.","fyBaseline":28.5,"fyForecast":28.5,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":172.1,"costNarrative":"The projects Baseline Whole Life Cost is �172.10m. This is primarily due to the following factors: Baseline WLC: Key factors that led to Cerberus project to set its Q4 2020/21 Baseline Whole life Cost are: External HMRC data source funding External industry data source funding Fixing data quality issues with providers Big Match and Entity Search may be insufficient to meet the requirements of the project requiring an additional technology Need to invest in business change resource to cover deficiency in change management Decommissioning- Semaphore run cost vstride cost Training development cost FTS user licence cost","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Technical & integration","Delivery & schedule","Workforce & capability"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber.This is primarily due to the following factors: Delivery is progressing largely as planned using an agile methodology and to date has delivered a live capability that is in operational use, albeit in a limited capacity. The programme is carrying some resource, governance…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21"},{"id":"HO_0042_2021-Q3","year":2022,"name":"Cerberus","department":"HO","category":"Government Transformation and Service Delivery","description":"Border Force is making a transformative change to its analytics and targeting capabilities, better securing the border with improved operational outcomes, driving operational efficiencies, and therefore achieving considerable cashable savings through the decommissioning of expensive legacy systems.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 remained at Amber Overall delivery confidence remains at Amber. Cerberus is a complex project with dependencies being managed and delivered across multiple products. New capabilities have been delivered into the business and are beginning to be used operationally. At the same time, Cerberus continues to ingest and exploit new data sets to improve targeting capability and develop risk scoring and experimentation capabilities. The key Q1 delivery milestones for the Cerberus are within the Air Passenger and RoRo modes.","startDate":"2019-10-01","endDate":"2024-04-01","scheduleNarrative":"Compared to 2021-Q4, your project end-date remained scheduled to finish on 01 APR 2024 . This is primarily due to the following factors: The programme is on track to be completed by the end of 2023/24. The timeline allows for the incremental delivery of data sets and targeting modes along with the underlying capabilities. This incremental approach to delivery allows for a steady and manageable change process which boosts feedback at each stage. This feedback can be thoroughly explored, and the agile working of the project means that changes required can be added into delivery plans. In addition, the timeline and sequencing of activities has been arranged to allow for the changes in technology and ways of working to land effectively and for the resulting capabilities to be fully leveraged.","fyBaseline":34.3,"fyForecast":34.3,"fyVariance":0.0,"varianceNarrative":"The budget variance is inferior or equal to 5%.","wholeLifeCost":172.0,"costNarrative":"Compared to 2021-Q4,the projects Baseline Whole Life Cost remained at 172.10 (£m). This is primarily due to the following factors: Cerberus has successfully received a three-year funding allocation from the recent Spending Review. Cerberus is funded in FY22/23 by Border Force Change, with supplementary funding from the Multi-Agency Hub Board for work around General Aviation. Costs in this section are nominal (without inflation): Of the allocated funding for FY22/23, a total of £27.6m is Capital Departmental Expenditure Limits and £5.2m is Resource Departmental Expenditure Limits, which is £32.8m Total Departmental Expenditure Limits. The forecast expenditure for FY22/23 is £28.4m Capital Departmental Expenditure Limits and £4.3m Resource Departmental Expenditure Limits. The project team are looking at options to rebalance forecast costs in accordance with the budget. Future years will be confirmed through the annual allocation process but stand provisionally for FY23/24 at £19.4m change Capital Departmental Expenditure Limits, £2.9m change Resource Departmental Expenditure Limits and for FY24/25 at £6.7m change Capital Departmental Expenditure Limits, £1.7m change Resource Departmental Expenditure Limits.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Workforce & capability","Technical & integration"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 remained at Amber Overall delivery confidence remains at Amber. Cerberus is a complex project with dependencies being managed and delivered across multiple products. New capabilities have been delivered into the business and are…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"HO_0042_2021-Q3","year":2023,"name":"Cerberus","department":"HO","category":"Government Transformation and Service Delivery","description":"Border Force is making a transformative change to its analytics and targeting capabilities, better securing the border with improved operational outcomes, driving operational efficiencies, and therefore achieving considerable cashable savings through the decommissioning of expensive legacy systems.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 decreased from Amber (IPA rating) to Red (SRO rating). This is primarily due to the following factors. In Financial Year 22/23 Cerberus set out to deliver eight Level0 milestones, achieving five. Three milestones covering Air Passenger and Sea Containers modes have been moved or re-planned into future delivery. Our red rating reflects complexities in delivering Air Passenger and RoRo milestones at the end of Financial Year 22/23. A programme decision was made to focus delivery on achieving the RoRo milestone (met on the 31/03/2023), as a result the delivery of an Air Passenger Minimal Viable Product has moved into Financial Year 23/24. Discussions are currently underway to agree plans for an Air Passenger Minimal Viable Product.","startDate":"2019-10-01","endDate":"2025-03-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 increased from 2024-04-01 to 2025-03-31. This is primarily due to the following factors. The original end date of the programme was recorded incorrectly in GMPP reporting and is now recorded correctly.","fyBaseline":43.9,"fyForecast":43.9,"fyVariance":0.0,"varianceNarrative":"The budget variance is inferior or equal to 5%. Not required as variance is less than 5%","wholeLifeCost":198.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 increased from 172m. to 198m. This is primarily due to the following factors. Whole Life Cost - 198.2m (including sunk costs)- The Whole Life Cost of 172m excludes sunk costs.","benefits":172.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 172m. The project's departmental-agree monetised benefits at 22/23-Q4 is 172m. At the end of Financial Year 21/22, Cerberus delivered functionality to the decommissioning of BSM system. Since this point associated costs have been saved which are cashable to the Home Office at a value of 0.5million per annum. At the end of Financial Year 22/23 further releases have enabled a reduction in FTS user licences resulting in a further 0.3million per annum cashable saving. This functionality is also forecast to realise benefits associated with increased threat interdiction. A proportion of these can be monetised with a value of approximately 9.3million over the appraisal period. Further technology savings will be realised later than originally forecast due to delays of project milestones. Delivery in Air passengers and Sea container modes will realise a further 11.7million per annum cashable savings in this area. Interdiction benefits will also continue to accrue and increase up to a total of 65.9million of monetised benefits over the appraisal period, alongside strategic benefits from non-monetised threats. Further delivery will also facilitate efficiency savings cashable to the Home Office with a value of approximately 7.0million over the appraisal period. Further efficiency benefits are expected from increased automation, but these have not yet been quantified. This is an area of focus in the near future.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 decreased from Amber (IPA rating) to Red (SRO rating). This is primarily due to the following factors. In Financial Year 22/23 Cerberus set out to deliver eight Level0 milestones, achieving five. Three milestones covering Air Passenger and Sea Containers modes have…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"HO_0042_2021-Q3","year":2024,"name":"Cerberus","department":"HO","category":"Government Transformation and Service Delivery","description":"Border Force is making a transformative change to it's analytics and targeting capabilities better securing the border within improved operational outcomes, driving operational efficiencies and therefore achieving considerable cashable savings through the decommissioning of expensive legacy systems.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Delivery Confidence Assessment rating at 23/24-Q4 decreased from Red(SRO rating) to Amber(IPA rating). This is primarily due to the following factors. At Q4 new senior resource was brought into the Programme to help improve delivery, and get the Programme on the trajectory to Green. Q4 delivery confidence remained RED but is trending down._x000D_ Test and fix approaches have been improved already along with the allocation of specific delivery managers for specific releases. _x000D_ A full review of governance and control processes are ongoing. A number of new structures have been put in place already around risk management and reporting to allow for maturing conversation within the Programme. This work will continue for the remainder of the Programme.","startDate":"2019-10-01","endDate":"2025-03-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2025-03-31. This is primarily due to the following factors. The programme is still on track to finish as scheduled on 31st March 2025","fyBaseline":27.9,"fyForecast":39.2,"fyVariance":41.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. Not required as budget variance is inferior or equal to 5%","wholeLifeCost":147.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 decreased from 198m. to 147m. This is primarily due to the following factors. The programme is currently preparing a new business case for FY 24/25 where an indicative budget of 27.88m has been allocated and an options document is being prepared for InvestCo review. Until the business case has been finalised the WLC may or may not be affected.","benefits":56.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 2324-Q4 decreased from 172m. to 56m. Cerberus is already beginning to increase threat interdiction at the UK border. Some of this increase has an economic benefit to the UK, saving more than 10m p/a. Cerberus functionality will also enable the decommissioning of legacy systems, realising cashable savings to the Home Office of 12m p/a, a portion of which has already been achieved. Other benefits of further delivery include increased workforce efficiency.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Delivery Confidence Assessment rating at 23/24-Q4 decreased from Red(SRO rating) to Amber(IPA rating). This is primarily due to the following factors. At Q4 new senior resource was brought into the Programme to help improve delivery, and get the Programme on the trajectory to Green. Q4 delivery confidence remained…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"HO_0042_2021-Q3","year":2025,"name":"Cerberus","department":"HO","category":"Government Transformation and Service Delivery","description":"Border Force is making a transformative change to its analytics and targeting capabilities to identify the movement of high-risk goods and people across the UK border. This will enable border security through, improved operational outcomes, driving operational efficiencies, and achieving considerable cashable savings through the decommissioning of expensive legacy systems. Cerberus is in operational use today, targeting a subset of border movements, delivering both operational benefit and cashable savings. The operational use of the system will be expanded to new transport modes and users throughout the remainder of the project’s delivery, with additional functionality being developed and datasets added to further improve the efficiency and effectiveness of the system.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The Delivery Confidence Assessment is rated Amber because successful delivery of the programme to time, cost and quality appears feasible but there are some issues which already exist requiring management attention. Whilst significant progress has been made in the last year, the programme accepts that challenges around delivery and change management, and business preparedness still exist and as such these are being focused to be improved.","startDate":"2019-10-01","endDate":"2030-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2025 to 31/03/2030. This is primarily due to the following factors‚ The programmes previous end date was March 2025 as previously this was when funding was secured for. Following ongoing engagement with NISTA, further funding was sought to continue developing Cerberus post 25 to the end of the appraisal period 29/30 which is reflected in the new end-date.","fyBaseline":47.18,"fyForecast":27.88,"fyVariance":40.91,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ We reviewed run cost as part of OB and the figures have since changed. This means that the variance should be £300k underspend (1.1% of the allocated budget).","wholeLifeCost":240.97,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 147 to 240. This is primarily due to the following factors‚ This is due to the Run Cost being reviewed and the Programme WLC now covers up to FY34/35 rather than FY29/30.","benefits":197.63,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 56 to 197. This is primarily due to the following factors‚ Cerberus has been rolled out to the first cohort of users; interdiction benefits are forecast to accelerate as a result.","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The Delivery Confidence Assessment is rated Amber because successful delivery of the programme to time, cost and quality appears feasible but there are some issues…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"HO_0042_2021-Q3","year":2026,"name":"Cerberus","department":"HO","category":"Government Transformation and Service Delivery","description":"Cerberus is the Home Office programme to modernise how the UK border identifies risk in people and goods before they arrive and as they cross the border. It brings together data from multiple sources and uses analytics to help officers focus on the highest risk passengers, vehicles and freight, while allowing legitimate travel and trade to flow more smoothly. Cerberus supports both passenger and freight movements. Its current focus is on transforming air passenger targeting and improving risk assessment for roll on roll off freight, alongside strengthening data governance, system resilience and security. This supports the planned retirement of legacy systems that are costly to run and increasingly unreliable, reducing long term technology cost and operational risk. The overarching aim of Cerberus is to strengthen border security by improving the quality and timeliness of targeting decisions. It is designed to increase the detection of criminal activity such as organised immigration crime, smuggling and other high‑harm threats, while reducing unnecessary checks that disrupt the public and businesses. By providing better information to intelligence and operational teams, the programme supports more efficient use of resources and more effective interventions at the border and upstream. Looking ahead, Cerberus provides the digital foundation for a more data‑driven border. It is being delivered in stages, allowing the Home Office to stabilise delivery, learn from ongoing technology trials, and adapt future plans as evidence and operational insight develop.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained AMBER. This reflects a balanced position of continued delivery progress alongside the scale, complexity, and transition risks inherent in the programme’s next delivery phase. The programme has demonstrated improved delivery confidence over the last year through strengthened programme management, clearer ownership of the product backlog, and effective closure of critical recommendations from previous NISTA assurance activity. Delivery performance has stabilised, with Cerberus continuing to forecast delivery within its agreed cost, schedule, and quality parameters and evidencing more mature planning, governance, and risk management practices. The AMBER rating also reflects the scale and ambition of Cerberus as a Tier A GMPP programme, including complex data integration, operational dependency management, and transition from legacy systems. While delivery confidence has improved, residual risks remain around supplier transition, dependency management, and the coordination of business change alongside technical delivery. These risks are recognised and actively managed through strengthened governance, enhanced assurance, and closer collaboration between the programme team, Home Office Digital, and operational stakeholders. Overall, the maintained AMBER rating provides a fair and proportionate reflection of Cerberus’ improving delivery trajectory, while recognising the inherent complexity of delivering large‑scale, data‑enabled border security capabilities within a live operational environment.","startDate":"2019-12-31","endDate":"2030-03-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same. Despite earlier delivery challenges and the need to re sequence activity in response to technical, supplier and operational dependencies, the programme has remained focused on delivery. The revised delivery profile supports the completion of priority capability within a complex operating environment, while allowing for greater delivery confidence following programme stabilisation. The schedule continues to be driven by the need to complete critical passenger and goods targeting capabilities, including Air Passenger and RoRo delivery, which sit on the critical path to the decommissioning of legacy systems. Maintaining the existing end date has required re‑sequencing activity within the delivery plan to prioritise operational readiness, data quality, and assurance requirements, particularly where earlier phases identified the need to strengthen audit and controls before progressing further capability. In addition, the programme operates within a highly interdependent delivery environment, relying on upstream data pipelines, shared platforms, and alignment with wider Border Force and Home Office transformation activity. The schedule reflects these dependencies and is designed to minimise risk to frontline operations while ensuring Cerberus delivers a sustainable, multi‑modal targeting capability. Overall, retaining the previously published end‑date demonstrates that Cerberus has absorbed delivery complexity through re-planning and prioritisation rather than extending the programme timeline, while maintaining confidence in the achievability of the final end state.","fyBaseline":37.48,"fyForecast":38.75,"fyVariance":3.41,"varianceNarrative":"The budget variance is 5%, driven primarily by higher transition costs within CDEL arising from the transition from our current supplier to an in-house delivery capability led by HO Digital. A further element of the variance relates to Monitoring and Evaluation (M&E) activity, which represents an agreed pressure. The M&E work was a condition of the InvestCo arrangement and was not supported by a corresponding budget allocation, resulting in the remaining variance.","wholeLifeCost":285.1,"costNarrative":"Compared to financial year 24/25 Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) increased from £240.970m to £288.70m. This is primarily driven by higher transition costs resulting from the supplier change. Monitoring and Evaluation work as part of the InvesCo condition, and a review of run costs.","benefits":175.45,"benefitsNarrative":"Compared to FY 2024/25 Q4, the project’s departmentally agreed benefits at FY 2025/26 Q4 (measured in £) have remained stable. This reflects the continued maturity of the benefits baseline, with no material changes to agreed benefit assumptions during the period. This position is primarily due to the following factors - Benefits baseline stability. The departmentally agreed benefits baseline was confirmed and locked in FY 2024/25, with no material changes approved during the current reporting period. No material scope change There have been no significant changes to project scope that would materially increase or reduce the agreed benefits profile. Timing of benefits realisation. The majority of financial benefits remain scheduled for realisation in later phases of delivery, rather than within the FY 2025/26 Q4 reporting window. Assumptions unchanged. Key benefits assumptions (including volumes, behaviours, and dependency milestones) remain consistent with those previously approved through governance. Dependency alignment. Planned benefits remain dependent on the successful delivery and adoption of linked capabilities and operational changes, which are proceeding broadly as expected but have not yet triggered additional monetised benefits. No re profiling agreed. No re profiling or re valuation of benefits has been agreed through departmental governance during the period.","themes":["Delivery & schedule","Technical & integration","Cost & funding","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained AMBER. This reflects a balanced position of continued delivery progress alongside the scale, complexity, and transition risks inherent in the programme’s next delivery phase. The programme has demonstrated improved delivery confidence over the…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"HO_0042_2021-Q3","year":2025,"name":"Cerberus","department":"HO","category":"Government Transformation and Service Delivery","description":"Border Force is making a transformative change to its analytics and targeting capabilities to identify the movement of high-risk goods and people across the UK border. This will enable border security through, improved operational outcomes, driving operational efficiencies, and achieving considerable cashable savings through the decommissioning of expensive legacy systems. Cerberus is in operational use today, targeting a subset of border movements, delivering both operational benefit and cashable savings. The operational use of the system will be expanded to new transport modes and users throughout the remainder of the project’s delivery, with additional functionality being developed and datasets added to further improve the efficiency and effectiveness of the system.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The Delivery Confidence Assessment is rated Amber because successful delivery of the programme to time, cost and quality appears feasible but there are some issues which already exist requiring management attention. Whilst significant progress has been made in the last year, the programme accepts that challenges around delivery and change management, and business preparedness still exist and as such these are being focused to be improved.","startDate":"2019-10-01","endDate":"2030-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2025 to 31/03/2030. This is primarily due to the following factors‚ The programmes previous end date was March 2025 as previously this was when funding was secured for. Following ongoing engagement with NISTA, further funding was sought to continue developing Cerberus post 25 to the end of the appraisal period 29/30 which is reflected in the new end-date.","fyBaseline":47.18,"fyForecast":27.88,"fyVariance":40.91,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ We reviewed run cost as part of OB and the figures have since changed. This means that the variance should be £300k underspend (1.1% of the allocated budget).","wholeLifeCost":240.97,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 147 to 240. This is primarily due to the following factors‚ This is due to the Run Cost being reviewed and the Programme WLC now covers up to FY34/35 rather than FY29/30.","benefits":197.63,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 56 to 197. This is primarily due to the following factors‚ Cerberus has been rolled out to the first cohort of users; interdiction benefits are forecast to accelerate as a result.","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The Delivery Confidence Assessment is rated Amber because successful delivery of the programme to time, cost and quality appears feasible but there are some issues…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":0,"attentionScore":18,"attentionReasons":["Current published delivery confidence is Amber"]},{"id":"UNPUBLISHED-2026-B87B1EE731","year":2026,"name":"Children's Homes Capital Programme","department":"DFE","category":"Infrastructure and Construction","description":"The department is investing grant funding to support local authorities and other providers to improve and expand the regional provision of secure children's homes and open children's homes as part of its commitment to deliver stable loving homes for vulnerable children in care.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Programme delivery confidence for 2025/26 is Amber. The programme has continued to make progress, but delivery confidence is impacted by the risk faced on a small number of complex, large‑scale capital projects in a sector where comparable facilities have not been delivered for many years. This risk is ongoing rather than new and reflects the technical and commercial challenge of delivering these schemes, with potential pressure on cost and timetable, rather than a lack of momentum. Targeted progress has been made on the highest‑risk projects. This includes securing planning approval and buy-in across relevant local authorities for the new West Midlands safe centre, the London Secure Children’s Home scheme proceeding towards planning submission and construction tender, as well as £53 million of grants being awarded for new Open Children’s Homes to support vulnerable children with complex needs. Construction of the Lincolnshire Secure Children’s Home remains on target for completion in autumn 2026 and occupation from May 2027. Looking ahead, delivery confidence will depend on these major projects moving through procurement and into construction without material delay or cost escalation. The priority is close oversight of the most complex schemes, refreshed forecasts with local partners, and active grant management to intervene early where risks emerge. Sustained grip on these projects will be critical to reducing risk and supporting a move towards Green in future reporting.","startDate":"2023-03-16","endDate":null,"scheduleNarrative":"No schedule narrative has been provided as this programme will not remain in GMPP.","fyBaseline":44.66,"fyForecast":44.66,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%","wholeLifeCost":610.13,"costNarrative":"This programme joined GMPP in 25/26 and will not remain in GMPP going forward. The Whole Life Costs are calculated through combining the approved capital budgets of the projects that make up this programme. As a capital programme, project budgets are reviewed and controlled at key gateways.","benefits":null,"benefitsNarrative":"This programme does not report monetised benefits, as per the approved business case.","themes":["Delivery & schedule","Cost & funding","Commercial & supply chain","Approvals & decisions"],"evidenceExcerpt":"Programme delivery confidence for 2025/26 is Amber. The programme has continued to make progress, but delivery confidence is impacted by the risk faced on a small number of complex, large‑scale capital projects in a sector where comparable facilities have not been delivered for many years. This risk is ongoing rather than new and reflects the technical and…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"UNPUBLISHED-2026-B87B1EE731","year":2026,"name":"Children's Homes Capital Programme","department":"DFE","category":"Infrastructure and Construction","description":"The department is investing grant funding to support local authorities and other providers to improve and expand the regional provision of secure children's homes and open children's homes as part of its commitment to deliver stable loving homes for vulnerable children in care.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Programme delivery confidence for 2025/26 is Amber. The programme has continued to make progress, but delivery confidence is impacted by the risk faced on a small number of complex, large‑scale capital projects in a sector where comparable facilities have not been delivered for many years. This risk is ongoing rather than new and reflects the technical and commercial challenge of delivering these schemes, with potential pressure on cost and timetable, rather than a lack of momentum. Targeted progress has been made on the highest‑risk projects. This includes securing planning approval and buy-in across relevant local authorities for the new West Midlands safe centre, the London Secure Children’s Home scheme proceeding towards planning submission and construction tender, as well as £53 million of grants being awarded for new Open Children’s Homes to support vulnerable children with complex needs. Construction of the Lincolnshire Secure Children’s Home remains on target for completion in autumn 2026 and occupation from May 2027. Looking ahead, delivery confidence will depend on these major projects moving through procurement and into construction without material delay or cost escalation. The priority is close oversight of the most complex schemes, refreshed forecasts with local partners, and active grant management to intervene early where risks emerge. Sustained grip on these projects will be critical to reducing risk and supporting a move towards Green in future reporting.","startDate":"2023-03-16","endDate":null,"scheduleNarrative":"No schedule narrative has been provided as this programme will not remain in GMPP.","fyBaseline":44.66,"fyForecast":44.66,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%","wholeLifeCost":610.13,"costNarrative":"This programme joined GMPP in 25/26 and will not remain in GMPP going forward. The Whole Life Costs are calculated through combining the approved capital budgets of the projects that make up this programme. As a capital programme, project budgets are reviewed and controlled at key gateways.","benefits":null,"benefitsNarrative":"This programme does not report monetised benefits, as per the approved business case.","themes":["Delivery & schedule","Cost & funding","Commercial & supply chain","Approvals & decisions"],"evidenceExcerpt":"Programme delivery confidence for 2025/26 is Amber. The programme has continued to make progress, but delivery confidence is impacted by the risk faced on a small number of complex, large‑scale capital projects in a sector where comparable facilities have not been delivered for many years. This risk is ongoing rather than new and reflects the technical and…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":null,"ratingDelta":null,"transition":"Not comparable","endDateDeltaDays":null,"attentionScore":18,"attentionReasons":["Current published delivery confidence is Amber"]},{"id":"MOJ_0537_2526-Q1","year":2026,"name":"Community Support Programme","department":"MOJ","category":"Government Transformation and Service Delivery","description":"Design, commission, procure and implement new rehabilitative services.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Delivery Confidence Assessment (DCA) rating at 25/26-Q4 is Amber. This is largely due to anticipated reduction in funding resulting in the potential for changes in project scope.","startDate":"2023-03-01","endDate":"2029-03-09","scheduleNarrative":"The programme's end date at 25/26-Q4 is scheduled for 09/03/2029. The project is on track to deliver against the baseline schedule.","fyBaseline":2.05,"fyForecast":2.05,"fyVariance":0.0,"varianceNarrative":"The budget variance is less or equal to 5%.","wholeLifeCost":1024.83,"costNarrative":"The programme's Whole Life Costs for 25/26-Q4 are £1,024.83m. The Whole Life Costs are based on the most recent business case and include optimism bias.","benefits":null,"benefitsNarrative":"The programme has not provided details of monetised benefits for financial year 25/26-Q4. This project currently reports no monetised benefits. The project benefits focus on the quality of services contracts.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Scope & requirements"],"evidenceExcerpt":"The Delivery Confidence Assessment (DCA) rating at 25/26-Q4 is Amber. This is largely due to anticipated reduction in funding resulting in the potential for changes in project scope. The programme's end date at 25/26-Q4 is scheduled for 09/03/2029. The project is on track to deliver against the baseline schedule.","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"MOJ_0537_2526-Q1","year":2026,"name":"Community Support Programme","department":"MOJ","category":"Government Transformation and Service Delivery","description":"Design, commission, procure and implement new rehabilitative services.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Delivery Confidence Assessment (DCA) rating at 25/26-Q4 is Amber. This is largely due to anticipated reduction in funding resulting in the potential for changes in project scope.","startDate":"2023-03-01","endDate":"2029-03-09","scheduleNarrative":"The programme's end date at 25/26-Q4 is scheduled for 09/03/2029. The project is on track to deliver against the baseline schedule.","fyBaseline":2.05,"fyForecast":2.05,"fyVariance":0.0,"varianceNarrative":"The budget variance is less or equal to 5%.","wholeLifeCost":1024.83,"costNarrative":"The programme's Whole Life Costs for 25/26-Q4 are £1,024.83m. The Whole Life Costs are based on the most recent business case and include optimism bias.","benefits":null,"benefitsNarrative":"The programme has not provided details of monetised benefits for financial year 25/26-Q4. This project currently reports no monetised benefits. The project benefits focus on the quality of services contracts.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Scope & requirements"],"evidenceExcerpt":"The Delivery Confidence Assessment (DCA) rating at 25/26-Q4 is Amber. This is largely due to anticipated reduction in funding resulting in the potential for changes in project scope. The programme's end date at 25/26-Q4 is scheduled for 09/03/2029. The project is on track to deliver against the baseline schedule.","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":null,"ratingDelta":null,"transition":"Not comparable","endDateDeltaDays":null,"attentionScore":18,"attentionReasons":["Current published delivery confidence is Amber"]},{"id":"HO_0526_2526-Q1","year":2026,"name":"Concordis","department":"NCA","category":"Government Transformation and Service Delivery","description":"As a result of an impending lease-end, the NCA must leave its existing London Headquarters in Spring Gardens, Vauxhall. But it is, in any case, end of life, too big for NCA needs, expensive to run and unable to adapt to future needs due to factors such as the poor layout and age. The main focus for the Concordis programme is the delivery of the NCA’s new Headquarters in Stratford and transition of staff, the reconfiguration of the South Eastern Operational Branch to accommodate a joint operational partnership team, and the closure of Spring Gardens. This is part of the Agency’s broader Estates Strategy","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Concordis joined the GMPP, separate to the NCA Portfolio, from Q1 2025/26 due to the size, complexity and delivery status of the Programme. The delivery confidence has remained at Amber from Q1 to Q4 taking in to account that successful delivery of the programme to time, cost and quality appears feasible. Significant issues have emerged requiring management attention. These were resolvable and addressed promptly, so as not to present a cost/schedule overrun.","startDate":null,"endDate":null,"scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same. This is primarily due to managed governance models, strong RAID management and a comprehensive integrated plan.","fyBaseline":53.58,"fyForecast":53.58,"fyVariance":0.0,"varianceNarrative":"The budget variance for FY 2025/26 is less than 5%","wholeLifeCost":189.75,"costNarrative":"Concordis whole Life Cost of 189.95m remained the same during the FY period 2025/26.","benefits":120.62,"benefitsNarrative":"Concordis monetised benefits of 149.30m remained the same during the FY period 2025/26.","themes":["Cost & funding","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Concordis joined the GMPP, separate to the NCA Portfolio, from Q1 2025/26 due to the size, complexity and delivery status of the Programme. The delivery confidence has remained at Amber from Q1 to Q4 taking in to account that successful delivery of the programme to time, cost and quality appears feasible. Significant issues have emerged requiring management…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"HO_0526_2526-Q1","year":2026,"name":"Concordis","department":"NCA","category":"Government Transformation and Service Delivery","description":"As a result of an impending lease-end, the NCA must leave its existing London Headquarters in Spring Gardens, Vauxhall. But it is, in any case, end of life, too big for NCA needs, expensive to run and unable to adapt to future needs due to factors such as the poor layout and age. The main focus for the Concordis programme is the delivery of the NCA’s new Headquarters in Stratford and transition of staff, the reconfiguration of the South Eastern Operational Branch to accommodate a joint operational partnership team, and the closure of Spring Gardens. This is part of the Agency’s broader Estates Strategy","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Concordis joined the GMPP, separate to the NCA Portfolio, from Q1 2025/26 due to the size, complexity and delivery status of the Programme. The delivery confidence has remained at Amber from Q1 to Q4 taking in to account that successful delivery of the programme to time, cost and quality appears feasible. Significant issues have emerged requiring management attention. These were resolvable and addressed promptly, so as not to present a cost/schedule overrun.","startDate":null,"endDate":null,"scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same. This is primarily due to managed governance models, strong RAID management and a comprehensive integrated plan.","fyBaseline":53.58,"fyForecast":53.58,"fyVariance":0.0,"varianceNarrative":"The budget variance for FY 2025/26 is less than 5%","wholeLifeCost":189.75,"costNarrative":"Concordis whole Life Cost of 189.95m remained the same during the FY period 2025/26.","benefits":120.62,"benefitsNarrative":"Concordis monetised benefits of 149.30m remained the same during the FY period 2025/26.","themes":["Cost & funding","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Concordis joined the GMPP, separate to the NCA Portfolio, from Q1 2025/26 due to the size, complexity and delivery status of the Programme. The delivery confidence has remained at Amber from Q1 to Q4 taking in to account that successful delivery of the programme to time, cost and quality appears feasible. Significant issues have emerged requiring management…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":null,"ratingDelta":null,"transition":"Not comparable","endDateDeltaDays":null,"attentionScore":18,"attentionReasons":["Current published delivery confidence is Amber"]},{"id":"DLUHC_0181_2223-Q3","year":2026,"name":"DIGITAL PLANNING PROGRAMME","department":"MHCLG","category":"Government Transformation and Service Delivery","description":"The planning system should deliver the development that communities need and ensure that places are liveable and sustainable. Communities should trust the planning system and be sure they have the ability to engage with what gets built where. The system needs to be faster, more efficient and more certain, making local and national planning policies clearer to citizens, communities, and developers, and enabling effective consultation with affected communities. The MHCLG Digital Planning Programme will enable a modern and efficient 21st century planning system. The programme’s four key interventions (focused on better access to planning data, faster and more efficient planning decisions, improved local community engagement and, simpler, faster, more accessible plan making) will shift a semi analogue system based on documents to one that is data-driven, standards based and powered by modern user centred products and services. The programme is progressing the development and rollout of AI-enabled planning tools to support the shift from document-based processes to a digital, interoperable planning system. This includes Extract, which converts historic planning documents and maps into standardised, usable data, and Augmented Planning Decisions, which uses this data to enable faster, more consistent decision-making—initially targeting a significant reduction in processing times for householder applications.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. The NISTA Gateway Review took place in February 2026, assessing the programme’s readiness for the next phase of delivery. The review team were complimentary of the programme recognising improved delivery maturity within a complex and evolving environment. This resulted in an Amber delivery confidence rating, reflecting progress alongside the inherent challenges of scaling delivery nationally. The programme has prioritised activity to address the 12 Gateway recommendations which were focused around integrated planning, adoption, governance. A central priority is developing an integrated, outcome-focused plan that aligns dependencies, milestones and benefits across policy and delivery; this underpins several other recommendations. Key delivery risks are being managed through closer collaboration with partners and more targeted engagement with local authorities to support adoption. Governance is evolving to place emphasis on business change and operational delivery, with broader stakeholder involvement to strengthen ownership, accountability and benefits realisation.","startDate":"2020-09-01","endDate":null,"scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 increased from 30/03/2027 to 29/03/2030. This reflects an updated business case agreed at the recent spending review which sets out plans to scale digital transformation of the planning system, moving from pilots to widespread adoption. Key plans include scaling the Planning Data Platform, mandating data standards, enabling national data sharing and AI use, and shifting towards market intervention so suppliers meet a modern software definition. By 2030, the aim is a faster, data-driven system delivering productivity gains, better decisions, which will enable the delivery of 1.5 million homes.","fyBaseline":23.73,"fyForecast":23.73,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":218.54,"costNarrative":"The WLC has increased by £71m, reflecting increases from Spending Review Phase 2 and adjustments for inflation in real terms.","benefits":169.15,"benefitsNarrative":"The programme’s benefits combine cash and non-cash impacts from improved access to planning data and modern software, enabling faster decisions, more efficient processes, and better digital engagement. These align to Financial Year 25/26 outcomes, including quicker planning decisions, more transparent plan-making, and improved infrastructure delivery. The main cashable benefits include savings from digital citizen engagement tools; licence fee savings through adoption of the programme’s development management software; and reduced costs to local planning authorities in preparing local plans using digital plan making tools. In addition, the programme delivers non-cash benefits including reduced administrative burden for local authorities, improved accessibility of planning information, and greater consistency in decision-making, contributing to a more predictable and responsive planning system.","themes":["Delivery & schedule","Governance & assurance","Technical & integration","Approvals & decisions"],"evidenceExcerpt":"The SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. The NISTA Gateway Review took place in February 2026, assessing the programme’s readiness for the next phase of delivery. The review team were complimentary of the programme recognising improved delivery maturity within a complex and evolving environment. This resulted in an…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"DLUHC_0181_2223-Q3","year":2023,"name":"Digital Planning Programme","department":"DLUHC","category":"Government Transformation and Service Delivery","description":"The planning system should deliver the things that communities need, making places liveable, sustainable, and beautiful. Communities should trust the planning system and have the ability to engage with what gets built, where. The system needs to be faster, more efficient and more certain, making it clearer to citizens, communities, and developers what the rules and permissions are, and enable a better conversation about the inherent trade-offs involved in deciding what land is allocated and what is built. The Digital Planning Programme will enable a modern and efficient 21st century planning system. The programmes four key interventions will shift a semi analogue system, based on documents, to one that is data-driven, standards based, and powered by modern user centred products and services.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 is Amber. This is primarily due to the following factors. The Infrastructure and Projects Authority (IPA) Gateway 2 review took place in September 2022 and resulted in the disaggregation of the planning reform programme. Digital Planning was classified as a GMPP programme in its own right. The Digital Planning Programme was given an amber delivery confidence rating, with the review team endorsing a portfolio approach to the planning reforms. In response to the IPA recommendations and Accounting Officer (AO) assurance review, which took place in October 2022, the programme developed an action plan to take forward the recommendations, with a particular focus on the digital planning adoption strategy. The immediate priorities for the programme remain focussed around adoption, and the delivery of legislation (planning data clauses in the Levelling Up and Regeneration Bill). Both remain on track.","startDate":"2020-09-01","endDate":"2027-12-31","scheduleNarrative":"The project's end-date at 22/23-Q4 is 2027-12-31. This is primarily due to the following factors. The programme's end-date at 22/23-Q4 is Q3 2027. This is primarily due to the overall implementation of planning reform and legislation. We expect Royal Assent of the Levelling Up and Regeneration Bill to be reached later this year. Thereafter, there will be a period for secondary legislation and regulations to be laid. There will be a transition period where new style local plans are delivered and adopted.","fyBaseline":21.8,"fyForecast":19.8,"fyVariance":-9.0,"varianceNarrative":"Delays to awarding technical support contracts delayed spending in FY22/23 by several months (-2.3m). Part of this underspend (+0.3m) was utilised by providing additional support to Local Planning Authorities for digital citizen engagement projects.","wholeLifeCost":150.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 22/23-Q4 is 150m. This is primarily due to the following factors. The Digital Planning Programme whole life costs cover funding for planning software adoption and development by Local Planning Authorities, and the technical support provided by delivery partners for development and hosting of a planning data platform. Additionally, this includes costs for the adoption of digital local plans.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. The project's departmental-agree monetised benefits at 22/23-Q4 is 0m. Since the last year, the Digital Planning Programme has separated from wider planning reform. The forecast benefits now reflect the cash-releasing benefits from better data availability and accessibility, leading to cost savings incurred from producing a digital local plan, as well as non-cash-releasing benefits from software development reducing inefficiencies and, thus, time (in terms of hours spent processing and validating planning applications). These benefits were estimated using evidence from digital planning pilots. Further monetisable benefits, such as those for digital citizen engagement, will be identified through the monitoring and evaluation of the programme.","themes":["Technical & integration","Cost & funding","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 is Amber. This is primarily due to the following factors. The Infrastructure and Projects Authority (IPA) Gateway 2 review took place in September 2022 and resulted in the disaggregation of the planning reform programme. Digital Planning was classified as a GMPP…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"DLUHC_0181_2223-Q3","year":2024,"name":"Digital Planning Programme","department":"DLUHC","category":"Government Transformation and Service Delivery","description":"The Digital Planning Programme will enable a modern and efficient 21st century planning system.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. As at March 24: We continue to assess the delivery confidence of the programme as amber. _x000D_ _x000D_ The programme continued to focus on IPA recommendations relating to programme wide adoption, engagement and innovation strategies.","startDate":"2020-09-01","endDate":"2027-03-30","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 decreased from 2027-12-31 to 2027-03-30. This is primarily due to the following factors. As at March 24: The project's end-date is March 2027. This has changed to align with the agreed funding period.","fyBaseline":31.05,"fyForecast":31.9,"fyVariance":3.0,"varianceNarrative":"The budget variance is inferior or equal to 5%.","wholeLifeCost":151.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 increased from 150m. to 151m. This is primarily due to the following factors. Project Baseline Whole Life Cost remians at 150.01 (m) as reoported in 22-23. WLC included expected programme budget to continue delivery beyond the spending review period (25-26 and beyond). _x000D_ _x000D_ Future year funding adjusted to reflect increased focus on software adoption and development (largest proportion of the digital planning budget) to better align budget with programme delivery plans. 17.9m of 24-25 budget is allocated to for LPAs to deliver software adoption. _x000D_ _x000D_ Programme optimism bias has been reallocated to fund increased workforce and PropTech adoption work.","benefits":232.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 232m. Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 2324-Q4 increased from 0m to 232m.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. As at March 24: We continue to assess the delivery confidence of the programme as amber. _x000D_ _x000D_ The programme continued to focus on IPA recommendations…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"DLUHC_0181_2223-Q3","year":2025,"name":"DIGITAL PLANNING PROGRAMME","department":"MHCLG","category":"Government Transformation and Service Delivery","description":"The planning system should deliver the development that communities need and ensure that places are liveable and sustainable. Communities should trust the planning system and be sure they have the ability to engage with what gets built where. The system needs to be faster, more efficient and more certain, making local and national planning policies clearer to citizens, communities, and developers, and enabling effective consultation with affected communities. The MHCLG Digital Planning Programme will enable a modern and efficient 21st century planning system. The programme’s four key interventions (focused around better access to planning data, faster and more efficient planning decisions, improved local community engagement and, simpler, faster, more accessible plan making) will shift a semi analogue system based on documents to one that is data-driven, standards based and powered by modern user centred products and services.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The latest IPA gateway 0 (3) review took place in October 2024 with the programme given an Amber rating, with narrative from the review team showing that we are maintaining good progress. The immediate priorities include: developing clear criteria and SMART measures to ensure successful delivery against revised targets for the current Spending Review period that can be evidenced. Ability to easily monitor the status of all Local Planning Authorities (LPAs) as they implement and adopt modern planning software. Revision of the Strategic Business Case to align with the Spending Review and reviewing the benefits strategy and plans to reflect the current state of the programme.","startDate":"2020-09-01","endDate":"2027-03-30","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained 30/03/2027. This is primarily due to the following factors: There has been no change to the schedule for the programme.","fyBaseline":37.13,"fyForecast":31.09,"fyVariance":16.27,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors: The underspend reflects a successful initiative to decrease spending on bench contracts held with our delivery partners, complemented by a greater emphasis on civil service recruitment. Further underspend is due to reduced scope of activities across the programme.","wholeLifeCost":148.34,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 106 to 148. This is primarily due to the following factors: Previous WLC did not include costs beyond Spending Review period which ended in 24/25. Therefore, WLC cost increase will continue to fund existing activities to be delivered in future Spending Review periods. These additional costs include workforce, maintenance and system support as well as product development which are necessary to ensure continued progress and successful completion of the programme’s objectives. We expect WLC to increase by the end of Financial Year 25/26, as the next phase of Spending Review is finalised.","benefits":184.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) decreased from 232 to 184. This is primarily due to the following factors: Projected programme benefits have been revised downward due to slower-than-expected adoption of digital tools by Local Planning Authorities (LPA), reflecting points we have learned since beginning the programme about the relationships with incumbent suppliers and the level of Local Authority capacity for adoption. Ongoing end-to-end testing with selected LPAs may identify further efficiencies for inclusion in future benefit assessments. Also, there has been an increase in inflation, compared to when the benefits were originally forecast.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The latest IPA gateway 0 (3) review took place in October 2024 with the programme given an Amber rating, with narrative from the review team showing that we are…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"DLUHC_0181_2223-Q3","year":2026,"name":"DIGITAL PLANNING PROGRAMME","department":"MHCLG","category":"Government Transformation and Service Delivery","description":"The planning system should deliver the development that communities need and ensure that places are liveable and sustainable. Communities should trust the planning system and be sure they have the ability to engage with what gets built where. The system needs to be faster, more efficient and more certain, making local and national planning policies clearer to citizens, communities, and developers, and enabling effective consultation with affected communities. The MHCLG Digital Planning Programme will enable a modern and efficient 21st century planning system. The programme’s four key interventions (focused on better access to planning data, faster and more efficient planning decisions, improved local community engagement and, simpler, faster, more accessible plan making) will shift a semi analogue system based on documents to one that is data-driven, standards based and powered by modern user centred products and services. The programme is progressing the development and rollout of AI-enabled planning tools to support the shift from document-based processes to a digital, interoperable planning system. This includes Extract, which converts historic planning documents and maps into standardised, usable data, and Augmented Planning Decisions, which uses this data to enable faster, more consistent decision-making—initially targeting a significant reduction in processing times for householder applications.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. The NISTA Gateway Review took place in February 2026, assessing the programme’s readiness for the next phase of delivery. The review team were complimentary of the programme recognising improved delivery maturity within a complex and evolving environment. This resulted in an Amber delivery confidence rating, reflecting progress alongside the inherent challenges of scaling delivery nationally. The programme has prioritised activity to address the 12 Gateway recommendations which were focused around integrated planning, adoption, governance. A central priority is developing an integrated, outcome-focused plan that aligns dependencies, milestones and benefits across policy and delivery; this underpins several other recommendations. Key delivery risks are being managed through closer collaboration with partners and more targeted engagement with local authorities to support adoption. Governance is evolving to place emphasis on business change and operational delivery, with broader stakeholder involvement to strengthen ownership, accountability and benefits realisation.","startDate":"2020-09-01","endDate":null,"scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 increased from 30/03/2027 to 29/03/2030. This reflects an updated business case agreed at the recent spending review which sets out plans to scale digital transformation of the planning system, moving from pilots to widespread adoption. Key plans include scaling the Planning Data Platform, mandating data standards, enabling national data sharing and AI use, and shifting towards market intervention so suppliers meet a modern software definition. By 2030, the aim is a faster, data-driven system delivering productivity gains, better decisions, which will enable the delivery of 1.5 million homes.","fyBaseline":23.73,"fyForecast":23.73,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":218.54,"costNarrative":"The WLC has increased by £71m, reflecting increases from Spending Review Phase 2 and adjustments for inflation in real terms.","benefits":169.15,"benefitsNarrative":"The programme’s benefits combine cash and non-cash impacts from improved access to planning data and modern software, enabling faster decisions, more efficient processes, and better digital engagement. These align to Financial Year 25/26 outcomes, including quicker planning decisions, more transparent plan-making, and improved infrastructure delivery. The main cashable benefits include savings from digital citizen engagement tools; licence fee savings through adoption of the programme’s development management software; and reduced costs to local planning authorities in preparing local plans using digital plan making tools. In addition, the programme delivers non-cash benefits including reduced administrative burden for local authorities, improved accessibility of planning information, and greater consistency in decision-making, contributing to a more predictable and responsive planning system.","themes":["Delivery & schedule","Governance & assurance","Technical & integration","Approvals & decisions"],"evidenceExcerpt":"The SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. The NISTA Gateway Review took place in February 2026, assessing the programme’s readiness for the next phase of delivery. The review team were complimentary of the programme recognising improved delivery maturity within a complex and evolving environment. This resulted in an…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"DLUHC_0181_2223-Q3","year":2025,"name":"DIGITAL PLANNING PROGRAMME","department":"MHCLG","category":"Government Transformation and Service Delivery","description":"The planning system should deliver the development that communities need and ensure that places are liveable and sustainable. Communities should trust the planning system and be sure they have the ability to engage with what gets built where. The system needs to be faster, more efficient and more certain, making local and national planning policies clearer to citizens, communities, and developers, and enabling effective consultation with affected communities. The MHCLG Digital Planning Programme will enable a modern and efficient 21st century planning system. The programme’s four key interventions (focused around better access to planning data, faster and more efficient planning decisions, improved local community engagement and, simpler, faster, more accessible plan making) will shift a semi analogue system based on documents to one that is data-driven, standards based and powered by modern user centred products and services.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The latest IPA gateway 0 (3) review took place in October 2024 with the programme given an Amber rating, with narrative from the review team showing that we are maintaining good progress. The immediate priorities include: developing clear criteria and SMART measures to ensure successful delivery against revised targets for the current Spending Review period that can be evidenced. Ability to easily monitor the status of all Local Planning Authorities (LPAs) as they implement and adopt modern planning software. Revision of the Strategic Business Case to align with the Spending Review and reviewing the benefits strategy and plans to reflect the current state of the programme.","startDate":"2020-09-01","endDate":"2027-03-30","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained 30/03/2027. This is primarily due to the following factors: There has been no change to the schedule for the programme.","fyBaseline":37.13,"fyForecast":31.09,"fyVariance":16.27,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors: The underspend reflects a successful initiative to decrease spending on bench contracts held with our delivery partners, complemented by a greater emphasis on civil service recruitment. Further underspend is due to reduced scope of activities across the programme.","wholeLifeCost":148.34,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 106 to 148. This is primarily due to the following factors: Previous WLC did not include costs beyond Spending Review period which ended in 24/25. Therefore, WLC cost increase will continue to fund existing activities to be delivered in future Spending Review periods. These additional costs include workforce, maintenance and system support as well as product development which are necessary to ensure continued progress and successful completion of the programme’s objectives. We expect WLC to increase by the end of Financial Year 25/26, as the next phase of Spending Review is finalised.","benefits":184.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) decreased from 232 to 184. This is primarily due to the following factors: Projected programme benefits have been revised downward due to slower-than-expected adoption of digital tools by Local Planning Authorities (LPA), reflecting points we have learned since beginning the programme about the relationships with incumbent suppliers and the level of Local Authority capacity for adoption. Ongoing end-to-end testing with selected LPAs may identify further efficiencies for inclusion in future benefit assessments. Also, there has been an increase in inflation, compared to when the benefits were originally forecast.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The latest IPA gateway 0 (3) review took place in October 2024 with the programme given an Amber rating, with narrative from the review team showing that we are…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":null,"attentionScore":18,"attentionReasons":["Current published delivery confidence is Amber"]},{"id":"DCMS_0321_2324-Q3","year":2026,"name":"EURO 2028","department":"DCMS","category":"Government Transformation and Service Delivery","description":"In 2028 the UK & Ireland will host the men's UEFA European Championships. This will be the biggest sporting event the UK and Ireland have ever jointly hosted.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA Delivery Confidence Assessment (DCA) rating at 25/26 remained at Amber. This is primarily because we remain confident of delivery on time and within budget, in line with our most recent NISTA-commissioned Gate Review. Following the transition into the delivery phase in April 2025, UK&Ireland 2028 Ltd has become well established in its role coordinating and delivering domestic partners' tournament hosting responsibilities. The programme has updated its Full Business Case (with refreshed costs and estimated benefits) and a successful tournament launch event took place in November 2025, where the UK Government contribution of up to £557m was announced.","startDate":"2023-10-11","endDate":null,"scheduleNarrative":"Compared to financial year 24/25 Q4, the project's end-date at 25/26 Q4 has increased from last year's published end date to this year's published end date of 31/03/2031. This is because the EURO 2028 tournament will take place from June to July 2028, and the evaluation of the programme (including its legacy and impact 'community programme') is expected to conclude by 31 March 2031.","fyBaseline":4.73,"fyForecast":4.82,"fyVariance":2.05,"varianceNarrative":"The budget variance is less than or equal to 5% post budget exchange at the Supplementary Estimates","wholeLifeCost":511.63,"costNarrative":"The project's departmentally agreed Whole Life Cost at 25/26 Q4 (measured in £m) is up to 557. This represents the total estimated UK Government contribution to plan and deliver the hosting responsibilities for the UEFA EURO 2028 Tournament. This has remained the same compared to last year's whole life cost, but has since been publically communicated for the first time. Please note figures referenced in the narratives were entered as nominal and the system automatically converts them to Real Terms.","benefits":3089.89,"benefitsNarrative":"Compared to financial year 24/25 Q4, the project's departmentally agreed benefits at 25/26-Q4 (measured in £m) increased from 2362 to 3200 (3600 including Ireland), This is primarily because the programme commissioned an updated socio-economic analysis, which is reflected in this updated estimate.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA Delivery Confidence Assessment (DCA) rating at 25/26 remained at Amber. This is primarily because we remain confident of delivery on time and within budget, in line with our most recent NISTA-commissioned Gate Review. Following the transition into the delivery phase in April 2025, UK&Ireland 2028 Ltd has become…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"DCMS_0321_2324-Q3","year":2024,"name":"UEFA EURO 2028","department":"DCMS","category":"Government Transformation and Service Delivery","description":"On 10 October, UEFA officially announced the UK and Ireland as the hosts of the 2028 men's European Championships. It will be the biggest sporting event the UK and Ireland have jointly hosted. The UEFA European Championships (EUROs) are globally the second largest football tournament. They are held every four years and last fully hosted in the UK (England) in 1996.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure and Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. The UK and Ireland were officially announced as the hosts of UEFA EURO 2028 in October 2023. The tournament will be delivered primarily by football partners (UEFA and the five Football Associations), working together with government partners across the UK and Ireland. The programme is now in a transition phase (October 2023 - December 2024), with a focus on putting in place firm foundations for tournament delivery. Successful delivery of the tournament is dependent on a range of public and private partners across the UK and Ireland. Robust governance, programme management and assurance measures are being put in place to coordinate delivery and ensure value for money. The tournament is largely reliant on existing stadium, transport and accommodation infrastructure. The hosting of matches at Casement Park in Northern Ireland is dependent on a separate project led by the Northern Ireland Executive.","startDate":"2023-10-11","endDate":"2030-03-31","scheduleNarrative":"The project's end-date at 23/24-Q4 is 2030-03-31. This is primarily due to the following factors. EURO 2028 will be delivered in June/July 2028. The evaluation of the programme is expected to conclude by 31 March 2030.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 22 of the Freedom of Information Act 2000 (Information intended for future publication)","wholeLifeCost":null,"costNarrative":"Exempt under Section 22 of the Freedom of Information Act 2000 (Information intended for future publication)","benefits":2362.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 2362m.","themes":["Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"The Infrastructure and Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. The UK and Ireland were officially announced as the hosts of UEFA EURO 2028 in October 2023. The tournament will be delivered primarily by football partners (UEFA and the five Football Associations), working…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"DCMS_0321_2324-Q3","year":2025,"name":"EURO 2028","department":"DCMS","category":"Government Transformation and Service Delivery","description":"In 2028 the UK & Ireland will host the men's UEFA European Championships. This will be the biggest sporting event the UK and Ireland have ever jointly hosted.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ We remain confident of delivery on time and within budget. After the UK and Ireland won the rights to host EURO 2028 in October 2023, the programme subsequently moved into the Transition Phase, during which the partnership put in place firm foundations for delivery. This included the completion of a key milestone - the launch in March 2025 of UK and Ireland 2028 Ltd, the private company established by the football associations to coordinate domestic partners’ tournament hosting responsibilities. The programme has now moved into the Delivery Phase, from April 2025.","startDate":"2023-10-10","endDate":"2030-03-31","scheduleNarrative":"The project's end-date at 24/25-Q4 is scheduled to be 31/03/2030. This is primarily due to the following factors, EURO 2028 will be delivered in June/July 2028. The evaluation of the programme is expected to conclude by 31 March 2030.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 22 - Information intended for future publication","wholeLifeCost":null,"costNarrative":"Section 22 - Information intended for future publication","benefits":2362.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at up to 2362. This is primarily due to the following factors‚ As at 31/03/2025 there has been no change in estimated socio economic benefit for the tournament.","themes":["Delivery & schedule","Cost & funding"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ We remain confident of delivery on time and within budget. After the UK and Ireland won the rights to host EURO 2028 in October 2023, the programme subsequently moved…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"DCMS_0321_2324-Q3","year":2026,"name":"EURO 2028","department":"DCMS","category":"Government Transformation and Service Delivery","description":"In 2028 the UK & Ireland will host the men's UEFA European Championships. This will be the biggest sporting event the UK and Ireland have ever jointly hosted.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA Delivery Confidence Assessment (DCA) rating at 25/26 remained at Amber. This is primarily because we remain confident of delivery on time and within budget, in line with our most recent NISTA-commissioned Gate Review. Following the transition into the delivery phase in April 2025, UK&Ireland 2028 Ltd has become well established in its role coordinating and delivering domestic partners' tournament hosting responsibilities. The programme has updated its Full Business Case (with refreshed costs and estimated benefits) and a successful tournament launch event took place in November 2025, where the UK Government contribution of up to £557m was announced.","startDate":"2023-10-11","endDate":null,"scheduleNarrative":"Compared to financial year 24/25 Q4, the project's end-date at 25/26 Q4 has increased from last year's published end date to this year's published end date of 31/03/2031. This is because the EURO 2028 tournament will take place from June to July 2028, and the evaluation of the programme (including its legacy and impact 'community programme') is expected to conclude by 31 March 2031.","fyBaseline":4.73,"fyForecast":4.82,"fyVariance":2.05,"varianceNarrative":"The budget variance is less than or equal to 5% post budget exchange at the Supplementary Estimates","wholeLifeCost":511.63,"costNarrative":"The project's departmentally agreed Whole Life Cost at 25/26 Q4 (measured in £m) is up to 557. This represents the total estimated UK Government contribution to plan and deliver the hosting responsibilities for the UEFA EURO 2028 Tournament. This has remained the same compared to last year's whole life cost, but has since been publically communicated for the first time. Please note figures referenced in the narratives were entered as nominal and the system automatically converts them to Real Terms.","benefits":3089.89,"benefitsNarrative":"Compared to financial year 24/25 Q4, the project's departmentally agreed benefits at 25/26-Q4 (measured in £m) increased from 2362 to 3200 (3600 including Ireland), This is primarily because the programme commissioned an updated socio-economic analysis, which is reflected in this updated estimate.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA Delivery Confidence Assessment (DCA) rating at 25/26 remained at Amber. This is primarily because we remain confident of delivery on time and within budget, in line with our most recent NISTA-commissioned Gate Review. Following the transition into the delivery phase in April 2025, UK&Ireland 2028 Ltd has become…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"DCMS_0321_2324-Q3","year":2025,"name":"EURO 2028","department":"DCMS","category":"Government Transformation and Service Delivery","description":"In 2028 the UK & Ireland will host the men's UEFA European Championships. This will be the biggest sporting event the UK and Ireland have ever jointly hosted.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ We remain confident of delivery on time and within budget. After the UK and Ireland won the rights to host EURO 2028 in October 2023, the programme subsequently moved into the Transition Phase, during which the partnership put in place firm foundations for delivery. This included the completion of a key milestone - the launch in March 2025 of UK and Ireland 2028 Ltd, the private company established by the football associations to coordinate domestic partners’ tournament hosting responsibilities. The programme has now moved into the Delivery Phase, from April 2025.","startDate":"2023-10-10","endDate":"2030-03-31","scheduleNarrative":"The project's end-date at 24/25-Q4 is scheduled to be 31/03/2030. This is primarily due to the following factors, EURO 2028 will be delivered in June/July 2028. The evaluation of the programme is expected to conclude by 31 March 2030.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 22 - Information intended for future publication","wholeLifeCost":null,"costNarrative":"Section 22 - Information intended for future publication","benefits":2362.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at up to 2362. This is primarily due to the following factors‚ As at 31/03/2025 there has been no change in estimated socio economic benefit for the tournament.","themes":["Delivery & schedule","Cost & funding"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ We remain confident of delivery on time and within budget. After the UK and Ireland won the rights to host EURO 2028 in October 2023, the programme subsequently moved…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":null,"attentionScore":18,"attentionReasons":["Current published delivery confidence is Amber"]},{"id":"DHSC_0071_2122-Q1","year":2026,"name":"FRONTLINE DIGITISATION","department":"DHSC","category":"Information and Communications Technology (ICT)","description":"The aim of the Frontline Digitisation (FD) programme is to support secondary care trusts to procure and implement an electronic patient record system (EPR) that meets our minimum standards. The ability to access up-to-date patient medical records at any time increases safety, improves outcomes and provides productivity benefits compared with paper records. Investment in digitising the frontline will ensure health and care staff have access to health-related information when and where it is needed, supporting them to deliver care efficiently, effectively and safely, reducing variation and improving outcomes. The delivery outcomes of the programme are: • Coverage – supporting trusts without an EPR to implement one – target 96% by March 26. • Capability – supporting trusts with an EPR to replace, extend or optimise it to meet our minimum standards – target 70% by March 26. • Convergence – making decisions about coverage and capability with the aim of having fewer, more integrated EPRs serving larger populations.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 improved from Amber to this year’s AMBER / GREEN rating. This is primarily due to the Programme having made very significant progress in increasing EPR Coverage and Digital Maturity across NHS Trusts. This is a key strategic capability uplift across the health ecosystem and this level of progress against a changing and unusually challenging delivery context was commended.","startDate":"2021-04-01","endDate":"2026-03-31","scheduleNarrative":"Compared to Financial Year 24/25 Q4, the project's end date at 25/26 Q4 remained the same with the programme closure taking place on 31st March 2026. The programme has completed with 94% coverage against a target of 96% however, all contracts have been signed with suppliers. The final capability is 73% against a target of 70%, reaching 78% by end of Quarter One 26/27 with no additional interventions.","fyBaseline":567.61,"fyForecast":552.77,"fyVariance":2.61,"varianceNarrative":"The programme variance was under 5%.","wholeLifeCost":2080.52,"costNarrative":"The Programme's departmentally agreed WLC remained unchanged from the 24/25 agreed WLC.","benefits":12131.07,"benefitsNarrative":"Compared to financial year 24/25, the project's departmentally agreed Benefits at 25/26 remains the same.","themes":["Delivery & schedule","Cost & funding","Workforce & capability","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 improved from Amber to this year’s AMBER / GREEN rating. This is primarily due to the Programme having made very significant progress in increasing EPR Coverage and Digital Maturity across NHS Trusts. This is a key strategic capability uplift across the…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"DHSC_0071_2122-Q1","year":2022,"name":"Frontline Digitisation","department":"DHSC","category":"ICT","description":"Our vision is a digitally-enabled health and care system, where the health service and its users have the digital services and access to the data they need to effectively manage and improve health and wellbeing. The Frontline Digitisation programme will support this vision by levelling up ICS and providers to a baseline level of digital capability, set out in our Minimum Digital Foundations, which will enable frontline clinical and operational staff to make best use of digital technology to deliver care efficiently, effectively and safely, reducing variations and improving quality and outcomes.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 is Amber Our programme is on schedule and should hopefully move to green once: Our Programme Business Case has been approved by HMT in June 22. We have fully resourced the programme team, an adequate support offer is in place and suitable proportionate assurance framework in place to help organisations succeed in meeting Minimum Digital Foundations standards. We can progress with this at pace once the PBC has been approved. We have confidence in ICS' plans to deliver the Minimum Digital Foundations by March 2025 and these are currently being reviewed. We will work with NHSEI Regions and ICS to support this.","startDate":"2021-04-01","endDate":"2025-03-31","scheduleNarrative":"Your project end-date is 31 MAR 2025. This is primarily due to the following factors: Our plan is on schedule providing we get the PBC approved by HMT in Jun 22. SR settlement had been agreed and funding profiled accordingly in the PBC","fyBaseline":320.0,"fyForecast":320.0,"fyVariance":0.0,"varianceNarrative":"The final 21/22 FD Underspend is £11m and represents only a 3.5% underspend against the £321.8m FD Budget","wholeLifeCost":2610.0,"costNarrative":"Your projects Baseline Whole Life Cost is 2610.00 (£m). This is primarily due to the following factors: The whole life costs of the programme is £2,045m. This was our SR settlement award.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Technical & integration","Approvals & decisions"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 is Amber Our programme is on schedule and should hopefully move to green once: Our Programme Business Case has been approved by HMT in June 22. We have fully resourced the programme team, an adequate support offer is in place and suitable proportionate assurance…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"DHSC_0071_2122-Q1","year":2023,"name":"Frontline Digitisation","department":"DHSC","category":"ICT","description":"Our vision is a digitised health and care system where the health service and its users have the digital services and access to information they need to effectively manage and improve health and wellbeing. We are levelling up healthcare systems and providers to a baseline level of core digital capability, as set out in What Good Looks Like, which enables frontline clinical staff to make best use of digital technology to deliver care efficiently, effectively and safely, reducing variations, and improving quality and outcomes","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 decreased from Amber to Red. This is primarily due to the following factors. Delivery confidence is red as a number of NHS trusts are reporting they are unlikely to be able to fully implement an Electronic Patient Record by March 2025. The Frontline Digitisation programme team is supporting each of these trusts to deliver as quickly as possible while maintaining the highest standards of patient care.","startDate":"2021-04-01","endDate":"2025-03-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2025-03-31. This is primarily due to the following factors. A revised business case to reflect a new programme end date of March 2026 in being prepared. The programme continues to work to the existing cost parameters, with budget being reprofiled to cover the additional year to March 2026, to ensure financial support is available when needed for trusts who are unable to deliver by March 2025.","fyBaseline":474.9,"fyForecast":474.9,"fyVariance":0.0,"varianceNarrative":"The GMPP project did not provide data","wholeLifeCost":1982.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 decreased from 2610m. to 1982m. This is primarily due to the following factors. FD Programme budget being reduced to support other NHS England priorities.","benefits":29814.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 29814m. The project's departmental-agree monetised benefits at 22/23-Q4 is 29814m.The project's departmental-agree monetised benefits at 22/23-Q4 is 29814m.The project's departmental-agree monetised benefits at 22/23-Q4 is 29814m. Benefits will be realised through local projects via FD programme investment. Systems and trusts undertaking these projects will be expected to undertake local 'As Is' and 'To Be' mapping to clearly articulate the expected benefits and the change management steps needed to access and realise those benefits. Investments will only be made when a project is able to demonstrate a robust return on investment with an appropriate Management approach that ensures realisation. Investment will typically occur over the life of the Programme with benefit returns modelled over 10 years. Systems and trusts will be expected to report actual benefits, referenced against forecasts stated within their business case, these returns will be aggregated to produce overall programme benefit returns.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Technical & integration"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 decreased from Amber to Red. This is primarily due to the following factors. Delivery confidence is red as a number of NHS trusts are reporting they are unlikely to be able to fully implement an Electronic Patient Record by March…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"DHSC_0071_2122-Q1","year":2024,"name":"Frontline Digitisation","department":"DHSC","category":"ICT","description":"Our vision is a digitally-enabled health and care system, where the health service and its users have the digital services and access to the data they need to effectively manage and improve health and wellbeing._x000D_ The Frontline Digitisation programme is supporting this vision by levelling up ICSs and providers to a baseline level of digital capability, set out in our Digital Capability Framework, which enables frontline clinical and operational staff to make the best use of digital technology to deliver care efficiently, effectively and safely, reducing variations and improving quality and outcomes. The EPR programme is focussed on Coverage, ensuring all trusts have an EPR, Capability, ensuring that trusts with an EPR meet our standard and Convergence, making decisions about coverage and capability with the aim of having fewer more integrated EPRs serving larger populations.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 decreased from Red to Amber. This is primarily due to the following factors. Programme delivery confidence is AMBER as agreement has been reached to extend the programme into FY25/26 to enable continued central support for trust EPR implementations in that year.","startDate":"2021-04-01","endDate":"2025-03-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2025-03-31. This is primarily due to the following factors. A revised business case to reflect the new programme end date of 31 March 2026 is in the process of being approved","fyBaseline":738.5,"fyForecast":470.8,"fyVariance":-36.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. Costs reflect the approved programme business case. An addendum with a revised funding profile is currently moving through approvals.","wholeLifeCost":1982.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 remained at 1982m. This is primarily due to the following factors. While we await sign off of the addendum, the current forecast WLC remains as set out in the approved case. This will be updated once approval has been reached to reflect the movement of funding into 25/26\"","benefits":29814.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 29814m. Benefits will be realised through local projects via FD programme investment. Systems and trusts undertaking these projects will be expected to undertake local 'As Is' and 'To Be' mapping to clearly articulate the expected benefits and the change management steps needed to access and realise those benefits. Investments will only be made when a project is able to demonstrate a robust return on investment with an appropriate Management approach that ensures realisation. Investment will typically occur over the life of the Programme with benefit returns modelled over 10 years. Systems and trusts will be expected to report actual benefits, referenced against forecasts stated within their business case, these returns will be aggregated to produce overall programme benefit returns.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 decreased from Red to Amber. This is primarily due to the following factors. Programme delivery confidence is AMBER as agreement has been reached to extend the programme into FY25/26 to enable continued central support for trust EPR…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"DHSC_0071_2122-Q1","year":2025,"name":"FRONTLINE DIGITISATION","department":"DHSC","category":"ICT","description":"The aim of the Frontline Digitisation (FD) programme is to support secondary care trusts to procure and implement an electronic patient record system (EPR) that meets our minimum standards. The ability to access up-to-date patient medical records at any time increases safety, improves outcomes and provides productivity benefits compared with paper records. Investment in digitising the frontline will ensure health and care staff have access to health-related information when and where it is needed, supporting them to deliver care efficiently, effectively and safely, reducing variation and improving outcomes. The delivery outcomes of the programme are: • Coverage – supporting trusts without an EPR to implement one – target 96% by March 26. • Capability – supporting trusts with an EPR to replace, extend or optimise it to meet our minimum standards – target 70% by March 26. • Convergence – making decisions about coverage and capability with the aim of having fewer, more integrated EPRs serving larger populations.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The Programme made significant progress in increasing EPR Coverage and Digital Maturity across NHS Trusts but there remains a changing and unusually challenging delivery context.","startDate":"2022-04-01","endDate":"2026-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2025 to 31/03/2026. This is primarily due to the following factors‚ There have been challenges with the pace at which the least digitally mature trusts have been able to move. The Programme deadline has therefore been extended from March 2025 to March 2026. The programme has been putting in place extra interventional specialist support for these trusts and we are ensuring we capture lessons learned from this cohort and respond to them.","fyBaseline":510.0,"fyForecast":469.0,"fyVariance":8.04,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ Variance between Financial Year Baseline (£510m) & Financial Year Forecast (£469m) was -£41m. Therefore, the variance between the full year Baseline & Forecast was 8%. Throughout the year the programme worked with provider organisations to manage allocations and reprioritise funding where needed. At the request of the Transformation Directorate (TD), rather than re-allocate funding from trusts unable to spend it, funds have been utilised to support the directorate’s overall position. The underspend at the end of the year was c.£10m or 2% of the overall budget. In addition, to support the wider TD position the programme reprovisioned funding back to the directorate to support wider pressures in-year, to a total value of c.£30m. This gave the final outturn position of £469m against the opening budget of £510m.","wholeLifeCost":2035.2,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 1982 to 2035. This is primarily due to the following factors‚ Total Departmental Baseline Whole Life Costs Range – (Mid) was £2,035.2m. This has increased from the previous baseline due to the provision of increased budget in 25/26 as agreed with DHSC/NHSE and set out in the PBC addendum that returns the programme to the budget level set out in the original PBC.","benefits":13208.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) decreased from 29814 to 13208. This is primarily due to the following factors The 4th addendum has resulted in a change to the original benefits forecast. There have been three main drivers to the change in benefits from the original PBC that has led to the revised BCR of 4.45:1 • The rephasing of funding into 25/26 means less benefit is realised within the 10-year economic assessment though these benefits would continue to be accrued from year 11 onwards. • Reduction in the societal benefit linked to sepsis mortality benefits being revised down following further econometric modelling. • Increase in non-cash releasing benefits linked to length of stay reduction following further econometric modelling. This has reduced the forecast benefits to £13.2bn. Within that total quantum there is an increase in overall productivity benefit arising from the reduction in length of stay.","themes":["Cost & funding","Delivery & schedule","Technical & integration"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The Programme made significant progress in increasing EPR Coverage and Digital Maturity across NHS Trusts but there remains a changing and unusually challenging…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"DHSC_0071_2122-Q1","year":2026,"name":"FRONTLINE DIGITISATION","department":"DHSC","category":"Information and Communications Technology (ICT)","description":"The aim of the Frontline Digitisation (FD) programme is to support secondary care trusts to procure and implement an electronic patient record system (EPR) that meets our minimum standards. The ability to access up-to-date patient medical records at any time increases safety, improves outcomes and provides productivity benefits compared with paper records. Investment in digitising the frontline will ensure health and care staff have access to health-related information when and where it is needed, supporting them to deliver care efficiently, effectively and safely, reducing variation and improving outcomes. The delivery outcomes of the programme are: • Coverage – supporting trusts without an EPR to implement one – target 96% by March 26. • Capability – supporting trusts with an EPR to replace, extend or optimise it to meet our minimum standards – target 70% by March 26. • Convergence – making decisions about coverage and capability with the aim of having fewer, more integrated EPRs serving larger populations.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 improved from Amber to this year’s AMBER / GREEN rating. This is primarily due to the Programme having made very significant progress in increasing EPR Coverage and Digital Maturity across NHS Trusts. This is a key strategic capability uplift across the health ecosystem and this level of progress against a changing and unusually challenging delivery context was commended.","startDate":"2021-04-01","endDate":"2026-03-31","scheduleNarrative":"Compared to Financial Year 24/25 Q4, the project's end date at 25/26 Q4 remained the same with the programme closure taking place on 31st March 2026. The programme has completed with 94% coverage against a target of 96% however, all contracts have been signed with suppliers. The final capability is 73% against a target of 70%, reaching 78% by end of Quarter One 26/27 with no additional interventions.","fyBaseline":567.61,"fyForecast":552.77,"fyVariance":2.61,"varianceNarrative":"The programme variance was under 5%.","wholeLifeCost":2080.52,"costNarrative":"The Programme's departmentally agreed WLC remained unchanged from the 24/25 agreed WLC.","benefits":12131.07,"benefitsNarrative":"Compared to financial year 24/25, the project's departmentally agreed Benefits at 25/26 remains the same.","themes":["Delivery & schedule","Cost & funding","Workforce & capability","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 improved from Amber to this year’s AMBER / GREEN rating. This is primarily due to the Programme having made very significant progress in increasing EPR Coverage and Digital Maturity across NHS Trusts. This is a key strategic capability uplift across the…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"DHSC_0071_2122-Q1","year":2025,"name":"FRONTLINE DIGITISATION","department":"DHSC","category":"ICT","description":"The aim of the Frontline Digitisation (FD) programme is to support secondary care trusts to procure and implement an electronic patient record system (EPR) that meets our minimum standards. The ability to access up-to-date patient medical records at any time increases safety, improves outcomes and provides productivity benefits compared with paper records. Investment in digitising the frontline will ensure health and care staff have access to health-related information when and where it is needed, supporting them to deliver care efficiently, effectively and safely, reducing variation and improving outcomes. The delivery outcomes of the programme are: • Coverage – supporting trusts without an EPR to implement one – target 96% by March 26. • Capability – supporting trusts with an EPR to replace, extend or optimise it to meet our minimum standards – target 70% by March 26. • Convergence – making decisions about coverage and capability with the aim of having fewer, more integrated EPRs serving larger populations.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The Programme made significant progress in increasing EPR Coverage and Digital Maturity across NHS Trusts but there remains a changing and unusually challenging delivery context.","startDate":"2022-04-01","endDate":"2026-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2025 to 31/03/2026. This is primarily due to the following factors‚ There have been challenges with the pace at which the least digitally mature trusts have been able to move. The Programme deadline has therefore been extended from March 2025 to March 2026. The programme has been putting in place extra interventional specialist support for these trusts and we are ensuring we capture lessons learned from this cohort and respond to them.","fyBaseline":510.0,"fyForecast":469.0,"fyVariance":8.04,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ Variance between Financial Year Baseline (£510m) & Financial Year Forecast (£469m) was -£41m. Therefore, the variance between the full year Baseline & Forecast was 8%. Throughout the year the programme worked with provider organisations to manage allocations and reprioritise funding where needed. At the request of the Transformation Directorate (TD), rather than re-allocate funding from trusts unable to spend it, funds have been utilised to support the directorate’s overall position. The underspend at the end of the year was c.£10m or 2% of the overall budget. In addition, to support the wider TD position the programme reprovisioned funding back to the directorate to support wider pressures in-year, to a total value of c.£30m. This gave the final outturn position of £469m against the opening budget of £510m.","wholeLifeCost":2035.2,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 1982 to 2035. This is primarily due to the following factors‚ Total Departmental Baseline Whole Life Costs Range – (Mid) was £2,035.2m. This has increased from the previous baseline due to the provision of increased budget in 25/26 as agreed with DHSC/NHSE and set out in the PBC addendum that returns the programme to the budget level set out in the original PBC.","benefits":13208.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) decreased from 29814 to 13208. This is primarily due to the following factors The 4th addendum has resulted in a change to the original benefits forecast. There have been three main drivers to the change in benefits from the original PBC that has led to the revised BCR of 4.45:1 • The rephasing of funding into 25/26 means less benefit is realised within the 10-year economic assessment though these benefits would continue to be accrued from year 11 onwards. • Reduction in the societal benefit linked to sepsis mortality benefits being revised down following further econometric modelling. • Increase in non-cash releasing benefits linked to length of stay reduction following further econometric modelling. This has reduced the forecast benefits to £13.2bn. Within that total quantum there is an increase in overall productivity benefit arising from the reduction in length of stay.","themes":["Cost & funding","Delivery & schedule","Technical & integration"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The Programme made significant progress in increasing EPR Coverage and Digital Maturity across NHS Trusts but there remains a changing and unusually challenging…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":0,"attentionScore":18,"attentionReasons":["Current published delivery confidence is Amber"]},{"id":"DFT_0498_2526-Q2","year":2026,"name":"Families First Partnership Programme","department":"DFE","category":"Government Transformation and Service Delivery","description":"The Families First Partnership programme is a national transformation programme to enable local authorities and safeguarding partners to implement the rollout of Family Help, multi-agency child protection teams and increasing the use of Family Networks. The programme was announced in November 2024 and commenced in April 2025. Local authorities should use the ring-fenced funding provided via the local government finance settlement to deliver the programme. There is a national expectation of fully operationalised delivery by March 2027. The core goal of the programme is to rebalance children’s services away from crisis intervention and towards earlier help. The programme supports the government’s mission to provide children with the best start in life, keep children safe and break down barriers to opportunity.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Programme delivery confidence for 2025/26 is Amber. The programme started this year and has moved at pace with national milestones being delivered as planned. This includes confirmation of multi-year funding (£2.4bn over 3 years), published grant determination letters and clear national expectations for full delivery by March 2027 (set out in the updated programme guide). The first independent evaluation report of the Families First for Children Pathfinders programme was also published, alongside several learning documents and engagement events which are accessible by all safeguarding partners and will support national rollout. These steps have provided local areas with ring-fenced funding and clear direction to progress the rollout of family help, multi-agency child protection teams and increased used of family networks. The Amber rating reflects ongoing delivery risk rather than a decline in performance, driven primarily by the complexity of the multi-agency reforms and the reliance on local areas (local authorities and their safeguarding partners) to deliver this change alongside wider pressures and potential competing priorities across public sector reforms. Early insight from delivery plans (which are signed by all safeguarding partners) and the first three monitoring data returns, show commitment to the programme from most local areas during the transformation year, but there remains variance in progress and pace. Looking ahead, programme delivery confidence will depend on local area progress towards the March 2027 expectation of full delivery. Local authorities will need to protect the ring-fenced funding for spend on prevention, and translate national guidance and local ambition into sustained service change that benefits children and families in the local area. National priorities for 2026/27 are strengthening monitoring and assurance, targeting delivery support where risk is identified as highest, and continued work with partners at a local and national level (specifically health and police) to maintain a unified approach for local delivery. Confidence will improve as quarterly monitoring returns track local delivery progress across key (already defined) delivery indicators more closely – meaning timely action can be taken in areas of underperformance and emerging best practice more readily shared.","startDate":"2025-04-01","endDate":"2029-03-31","scheduleNarrative":"The programme's end-date at 25/26-Q4 remained at 31/03/2029. This is the first year of reporting for this programme, and the end date remains unchanged from go-live.","fyBaseline":564.03,"fyForecast":543.13,"fyVariance":3.7,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":2922.61,"costNarrative":"The programme's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) is 3,062,773,075 (as agreed up to 28/29). This is the first year of reporting for this programme, so there is no previously reported figure for comparison.","benefits":6395.78,"benefitsNarrative":"The programme's departmentally agreed Benefits at 25/26-Q4 (measured in £m) stand at 0. This is primarily due to this being the first year of reporting for this programme, and yet to reach the stage where benefits will be delivered. However, the programme will deliver monetised benefits. It is anticipated that these will be confirmed during FY26/27 as evidence of implementation becomes available to refine estimates.","themes":["Delivery & schedule","Cost & funding","Governance & assurance","Technical & integration"],"evidenceExcerpt":"Programme delivery confidence for 2025/26 is Amber. The programme started this year and has moved at pace with national milestones being delivered as planned. This includes confirmation of multi-year funding (£2.4bn over 3 years), published grant determination letters and clear national expectations for full delivery by March 2027 (set out in the updated…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"DFT_0498_2526-Q2","year":2026,"name":"Families First Partnership Programme","department":"DFE","category":"Government Transformation and Service Delivery","description":"The Families First Partnership programme is a national transformation programme to enable local authorities and safeguarding partners to implement the rollout of Family Help, multi-agency child protection teams and increasing the use of Family Networks. The programme was announced in November 2024 and commenced in April 2025. Local authorities should use the ring-fenced funding provided via the local government finance settlement to deliver the programme. There is a national expectation of fully operationalised delivery by March 2027. The core goal of the programme is to rebalance children’s services away from crisis intervention and towards earlier help. The programme supports the government’s mission to provide children with the best start in life, keep children safe and break down barriers to opportunity.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Programme delivery confidence for 2025/26 is Amber. The programme started this year and has moved at pace with national milestones being delivered as planned. This includes confirmation of multi-year funding (£2.4bn over 3 years), published grant determination letters and clear national expectations for full delivery by March 2027 (set out in the updated programme guide). The first independent evaluation report of the Families First for Children Pathfinders programme was also published, alongside several learning documents and engagement events which are accessible by all safeguarding partners and will support national rollout. These steps have provided local areas with ring-fenced funding and clear direction to progress the rollout of family help, multi-agency child protection teams and increased used of family networks. The Amber rating reflects ongoing delivery risk rather than a decline in performance, driven primarily by the complexity of the multi-agency reforms and the reliance on local areas (local authorities and their safeguarding partners) to deliver this change alongside wider pressures and potential competing priorities across public sector reforms. Early insight from delivery plans (which are signed by all safeguarding partners) and the first three monitoring data returns, show commitment to the programme from most local areas during the transformation year, but there remains variance in progress and pace. Looking ahead, programme delivery confidence will depend on local area progress towards the March 2027 expectation of full delivery. Local authorities will need to protect the ring-fenced funding for spend on prevention, and translate national guidance and local ambition into sustained service change that benefits children and families in the local area. National priorities for 2026/27 are strengthening monitoring and assurance, targeting delivery support where risk is identified as highest, and continued work with partners at a local and national level (specifically health and police) to maintain a unified approach for local delivery. Confidence will improve as quarterly monitoring returns track local delivery progress across key (already defined) delivery indicators more closely – meaning timely action can be taken in areas of underperformance and emerging best practice more readily shared.","startDate":"2025-04-01","endDate":"2029-03-31","scheduleNarrative":"The programme's end-date at 25/26-Q4 remained at 31/03/2029. This is the first year of reporting for this programme, and the end date remains unchanged from go-live.","fyBaseline":564.03,"fyForecast":543.13,"fyVariance":3.7,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":2922.61,"costNarrative":"The programme's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) is 3,062,773,075 (as agreed up to 28/29). This is the first year of reporting for this programme, so there is no previously reported figure for comparison.","benefits":6395.78,"benefitsNarrative":"The programme's departmentally agreed Benefits at 25/26-Q4 (measured in £m) stand at 0. This is primarily due to this being the first year of reporting for this programme, and yet to reach the stage where benefits will be delivered. However, the programme will deliver monetised benefits. It is anticipated that these will be confirmed during FY26/27 as evidence of implementation becomes available to refine estimates.","themes":["Delivery & schedule","Cost & funding","Governance & assurance","Technical & integration"],"evidenceExcerpt":"Programme delivery confidence for 2025/26 is Amber. The programme started this year and has moved at pace with national milestones being delivered as planned. This includes confirmation of multi-year funding (£2.4bn over 3 years), published grant determination letters and clear national expectations for full delivery by March 2027 (set out in the updated…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":null,"ratingDelta":null,"transition":"Not comparable","endDateDeltaDays":null,"attentionScore":18,"attentionReasons":["Current published delivery confidence is Amber"]},{"id":"UNPUBLISHED-2026-9F1C1C6F9F","year":2026,"name":"Flood and Coastal Risk Management (FCRM) Investment Programme 2026-2029","department":"DEFRA","category":"Infrastructure and Construction","description":"A 3-year capital investment programme for the creation, refurbishment and capital maintenance of England's flood defence infrastructure to protect properties, infrastructure and the environment.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Programme has only existed on GMPP for 2 quarters, however currently retains an Amber rating.","startDate":"2026-04-01","endDate":"2029-03-31","scheduleNarrative":"The programmes end date has remained at 31/03/2029 since GMPP reporting started in Q3 2025/26","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"\"The budget variance is less than or equal to 5%.\"","wholeLifeCost":3861.52,"costNarrative":"Programme WLCs cannot be compared as it has only just begun reporting on GMPP.","benefits":null,"benefitsNarrative":"Programme benefits cannot be compared as it has only just begun reporting on GMPP.","themes":["Cost & funding"],"evidenceExcerpt":"Programme has only existed on GMPP for 2 quarters, however currently retains an Amber rating. The programmes end date has remained at 31/03/2029 since GMPP reporting started in Q3 2025/26","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"UNPUBLISHED-2026-9F1C1C6F9F","year":2026,"name":"Flood and Coastal Risk Management (FCRM) Investment Programme 2026-2029","department":"DEFRA","category":"Infrastructure and Construction","description":"A 3-year capital investment programme for the creation, refurbishment and capital maintenance of England's flood defence infrastructure to protect properties, infrastructure and the environment.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Programme has only existed on GMPP for 2 quarters, however currently retains an Amber rating.","startDate":"2026-04-01","endDate":"2029-03-31","scheduleNarrative":"The programmes end date has remained at 31/03/2029 since GMPP reporting started in Q3 2025/26","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"\"The budget variance is less than or equal to 5%.\"","wholeLifeCost":3861.52,"costNarrative":"Programme WLCs cannot be compared as it has only just begun reporting on GMPP.","benefits":null,"benefitsNarrative":"Programme benefits cannot be compared as it has only just begun reporting on GMPP.","themes":["Cost & funding"],"evidenceExcerpt":"Programme has only existed on GMPP for 2 quarters, however currently retains an Amber rating. The programmes end date has remained at 31/03/2029 since GMPP reporting started in Q3 2025/26","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":null,"ratingDelta":null,"transition":"Not comparable","endDateDeltaDays":null,"attentionScore":18,"attentionReasons":["Current published delivery confidence is Amber"]},{"id":"MHCLG_0001_1920-Q3","year":2026,"name":"GRENFELL SITE AND PROGRAMME","department":"MHCLG","category":"Infrastructure and Construction","description":"The Grenfell Tower fire was a national tragedy in which 72 people lost their lives, with a profound and lasting impact on the bereaved families, survivors and the wider community. The Grenfell Programme oversees the works to carefully take down the Grenfell Tower, and works with the Grenfell Tower Memorial Commission to deliver a fitting and lasting memorial that honours those who lost their lives, a second site to carefully lay the Tower to rest and an archive. The programme further remains committed to working with bereaved families, survivors, the immediate community, partners across government, health services and the Council to ensure that families and the community continue to receive the support they need in the long term.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The SRO Delivery Confidence Assessment rating at 25/26-Q4 remained at Amber. Delivery across the programme remains achievable, with active management of risks and issues. In November 2025, Freehaus was selected as the new Multi-Disciplinary Design Team (MDDT). The MDDT is in the process of developing a Memorial Design in collaboration with the community. Engagement with internal and external stakeholders remains critical and a core focus for the programme team.","startDate":"2019-07-15","endDate":null,"scheduleNarrative":"There has been no change to the schedule for the programme.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide costs/schedule information, Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Exempt under Section 43 - Commercial interests","themes":["Delivery & schedule","Commercial & supply chain","Scope & requirements","Governance & assurance"],"evidenceExcerpt":"The SRO Delivery Confidence Assessment rating at 25/26-Q4 remained at Amber. Delivery across the programme remains achievable, with active management of risks and issues. In November 2025, Freehaus was selected as the new Multi-Disciplinary Design Team (MDDT). The MDDT is in the process of developing a Memorial Design in collaboration with the community.…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"MHCLG_0001_1920-Q3","year":2021,"name":"Grenfell Site and Programme","department":"MHCLG","category":"Infrastructure and Construction","description":"Delivering the vision of the community-led Grenfell Tower Memorial Commission for a fitting memorial for the bereaved, survivors and Grenfell community, recognising the Grenfell Tower fire tragedy and honouring those who lost their lives.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber.This is primarily due to the following factors: The DCA rating was Amber due to the following factors: - A decision on the future of the Tower is due to be taken by the Secretary of State in the summer of 2021. - Technical evidence about the Tower will be published and shared with bereaved, survivors and the community from May 2021 prior to a decision on the future of the Tower by the Secretary of State. - Engagement and decision making about the Tower should align with the principles set out in the Written Ministerial Statement laid in Parliament in November 2018, otherwise there is a risk to successfully delivering the vision of the Grenfell Tower Memorial Commission for a fitting memorial for bereaved, survivors and the community.","startDate":"2019-07-15","endDate":"2026-04-30","scheduleNarrative":"The project end-date is 30 April 2026. This is primarily due to the following factors: - Delays to the procurement of a new principal contractor for safety works required to the Tower, as a decision was taken by the Secretary of State to undertake an open market procurement for the safety works, rather than use a procurement framework. - The Grenfell Tower Memorial Commission will determine the scope of their report in 2021 and this may impact the programme's schedule.","fyBaseline":28.3,"fyForecast":20.83,"fyVariance":-26.0,"varianceNarrative":"The budget variance exceeds 5%. - RDEL: The programme has worked hard to replace contractors and consultants with civil servants which has resulted in value for money savings. Due to Covid-19, in person community events have not happened as planned and virtual events have been organised instead which have been significantly cheaper. This has meant that the RDEL cost has been lower than the full cost and budget expected at the start of the period. - CDEL: Delays to the procurement of a new principal contractor and subsequent safety work has meant that the CDEL cost is lower than the full cost and budget expected at the start of the period.","wholeLifeCost":171.41,"costNarrative":"The projects Baseline Whole Life Cost is �171.41m. This is primarily due to the following factors: - The programme's budgeted whole life costs include the costs needed to deliver the responsibilities associated with ownership of the site until the land is prepared for future use determined by the Grenfell Tower Memorial Commission. - HMT approved Full Business Case 1 to cover the costs need to carry out the final stage of the essential safety works, including phase 3 propping. This work is projected to conclude in May 2022. - A subsequent business case will be needed to cover further costs in preparing the site for future use, assumed to be a memorial. Most of these costs will occur beyond June 2022. - The programme has increased the costs of the programme due to additional responsibility for work previously carried out by the Grenfell Recovery team.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Approvals & decisions","Commercial & supply chain","Delivery & schedule"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber.This is primarily due to the following factors: The DCA rating was Amber due to the following factors: - A decision on the future of the Tower is due to be taken by the Secretary of State in the summer of 2021. - Technical evidence about the Tower will be published and…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21"},{"id":"MHCLG_0001_1920-Q3","year":2022,"name":"Grenfell Site and Programme","department":"DLUHC","category":"Infrastructure and Construction","description":"Delivering the vision of the community-led Grenfell Tower Memorial Commission for a fitting memorial for the bereaved, survivors and Grenfell community, recognising the Grenfell Tower fire tragedy and honouring those who lost their lives.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 2020/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 remained at Amber. The programme's delivery confidence score was Amber due to the following factors: - The Secretary of State decided to keep the tower standing for further engagement with bereaved, survivors and local residents. - The vision and scope of the Grenfell memorial is to be determined by the Grenfell Tower Memorial Commission, which is due to be set out later in 2022.","startDate":"2019-07-15","endDate":"2028-06-30","scheduleNarrative":"Compared to 2021-Q4, your programme end-date increased from 30 APR 2026 to 30 JUN 2028. This is primarily due to the following factors: - The programme is engaging with bereaved, survivors and local residents on the future of the tower, following a decision by the Secretary of State to keep the tower standing for a further period. - The Grenfell Tower Memorial Commission will determine the vision and scope of the memorial in 2022, this may impact the programme's schedule. The programme has developed an initial schedule for the memorial, using the Royal Institute of British Architects (RIBA) framework.","fyBaseline":27.54,"fyForecast":25.5,"fyVariance":-7.0,"varianceNarrative":"The budget variance exceeds 5%. Resource Budget: The programme has continued to replace contractors and consultants with civil servants and carry some vacancies into the next financial year. This has resulted in money savings and an overall underspend in staffing costs. Capital Budget: The principal contractor on site has re-sequenced activity planned over its contract duration. This has meant some costs anticipated in 2021/22 will now not take place, leading to an underspend in 2022/23. There is no impact on critical activities and the anticipated completion date. Additionally, an underspend on the Lancaster West Refurbishment accrual for 2020/21 contributed to reducing actuals during 2021/22.","wholeLifeCost":157.0,"costNarrative":"Compared to 2021-Q4, the programme's baseline Whole Life Cost decreased from 171.41 (£m) to 156.94 (£m). This is primarily due to the following factors: The programme's baseline figures for 2021/22 were reduced following the Supplementary Estimates process. Amounts returned were predominantly unused contingency, while some phase 3 propping costs moved into 2022/23, explaining the change to the total baseline cost from 2021-Q4. - The budgeted whole life costs include costs needed to deliver responsibilities associated with ownership of the site, until the land is prepared for future use determined by the Grenfell Tower Memorial Commission. - HM Treasury approved Full Business Case (FBC) for phase 1 (safety works) to cover costs needed to carry out the final stage of essential safety works, including phase 3 propping. This work is projected to conclude in September 2022. - Subsequent business cases are required to cover costs beyond September 2022. FBC phase 2 (future of the site) received conditional approval from DLUHC's Investment Sub Committee and covers activity to prepare the site for future use following the completion of phase 3 propping. A business case will be needed to cover the final next phase of the programme, assumed to be memorial construction.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 2020/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 remained at Amber. The programme's delivery confidence score was Amber due to the following factors: - The Secretary of State decided to keep the tower standing for further engagement with bereaved, survivors and local residents. -…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"MHCLG_0001_1920-Q3","year":2023,"name":"Grenfell Site and Programme","department":"DLUHC","category":"Infrastructure and Construction","description":"The programme achieved a significant milestone when the Grenfell Tower Memorial Commission (GTMC) published their interim report in May 22. Safety works on the tower completed in Oct 22 (on time, to budget and scope). Active monitoring continues to track the rate of degradation within the tower. Secretary of State held a Town Hall event for Bereaved and Survivors in Mar 23 and a community event in May 23, achieving the highest level of engagement with the community so far. The GTMC are working towards producing a final report in Sep 23.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber (SRO rating). This is primarily due to the following factors. Current rating is Amber. The Secretary of State has not yet made a decision about the future of the tower to allow more time for engagement and therefore the DCA remains amber. The safety works on the site have completed and the tower is now fully propped. The vision for the future memorial is to be determined by the Grenfell Tower Memorial Commission. The GTMC are working towards a final report and design brief to be published in 2023","startDate":"2019-07-15","endDate":"2029-03-30","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 increased from 2028-06-30 to 2029-03-30. This is primarily due to the following factors. - Secretary of State has entered a further round of engagement with bereaved, survivors and residents, delaying the decision on the tower.- Further engagement and intentional conversations surrounding the future of the tower will need to happen in the next round of engagement with Secretary of States approval - The Grenfell Tower Memorial Commissions timelines have been delayed from original plans due to several factors, including the resignation of co-chair Michael Lockwood and the need to increase engagement numbers on views for the memorial. This has meant the final report and design brief publication timelines have been pushed back further into 2023, impacting the overall schedule of the design competition and Royal Institute of British Architects (RIBA) stages to get towards the construction of the memorial. Using this agreed schedule for the memorial, the estimated end date for the project is now March 202","fyBaseline":15.4,"fyForecast":15.14,"fyVariance":-2.0,"varianceNarrative":"The budget variance is inferior or equal to 5%. The programmes budget/forecast variance is mainly due to an underspend on Resource Departmental expenditure limit (RDEL). - RDEL: The programme has continued to replace contractors and consultants with civil servants, which, alongside the introduction of controls on recruitment, have primarily contributed towards the RDEL underspend. - Capital DEL: Following the completion of safety works on time and to budget, CDEL costs have become static to reflect the ongoing maintenance required on site, resulting in a very minor overspend against the revised budget.","wholeLifeCost":291.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 increased from 157m. to 291m. This is primarily due to the following factors. - The change in baseline whole life cost, compared to the previous period, is due to baselines being updated to reflect updates to the programmes Strategic Outline Case. The programmes budgeted whole life cost now covers the costs needed to deliver the responsibilities associated with ownership of the site until the land is prepared for future use determined by the Grenfell Tower Memorial Commission. Changes in 22/23 reflect the reduction in 22/23 budgets in line with the revised programme requirements due to the delay in deconstruction. - To date, HM Treasury have approved Full Business Case (FBC) phase 1 and a Programme Business Case (PBC) covering one year within phase 2. FBC phase 1 covered costs to carry out the final stage of the essential safety works, which concluded in October 2022, while PBC phase 2 covers essential site maintenance. Future business cases will be developed covering a range of scenarios and timelines associated with preparing the site for future use, and to cover the final phase of the programme, assumed to be construction of a memorial","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. The project did not provide departmental-agree monetised benefits at 22/23-Q4. Due to the sensitivities of the programme, benefits are not tracked.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber (SRO rating). This is primarily due to the following factors. Current rating is Amber. The Secretary of State has not yet made a decision about the future of the tower to allow more time for engagement and therefore the DCA remains amber. The safety…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"MHCLG_0001_1920-Q3","year":2024,"name":"Grenfell Site and Programme","department":"DLUHC","category":"Infrastructure and Construction","description":"The Grenfell Site and Programme aims to deliver the vision of the Grenfell Tower Memorial Commission for a fitting memorial to be built on the Grenfell Tower site and working towards a Ministerial decision on the future of the Tower.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. As at March 24: We continue to assess the delivery confidence of the programme as amber._x000D_ _x000D_ The programme continues to focus on the IPA recommendations focussed on supporting the Grenfell Tower Memorial Commission (GTMC) to launch the design competition.","startDate":"2019-07-15","endDate":"2030-01-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 increased from 2029-03-30 to 2030-01-31. This is primarily due to the following factors. As at March 24: The project's end-date is January 2030. This is an extension of one year due to the timing of the decision being made on the future of the tower.","fyBaseline":22.31,"fyForecast":16.1,"fyVariance":-28.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. Some costs have moved into future financial years to accommodate the revised memorial timeline.","wholeLifeCost":290.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 decreased from 291m. to 290m. This is primarily due to the following factors. The cost profile was rebaselined.","benefits":0.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 0m. Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 0m.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. As at March 24: We continue to assess the delivery confidence of the programme as amber._x000D_ _x000D_ The programme continues to focus on the IPA recommendations focussed…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"MHCLG_0001_1920-Q3","year":2025,"name":"GRENFELL SITE AND PROGRAMME","department":"MHCLG","category":"Infrastructure and Construction","description":"The Grenfell Programme continues to support the recovery of the Grenfell community and is currently preparing to carefully take down the Grenfell Tower. We continue to work in partnership with the Grenfell Tower Memorial Commission to deliver a fitting memorial, and deliver the Grenfell Tower Memorial Commission's other recommendations for Government, including the provision of a second site, where materials from the Tower not used in the memorial will be laid to rest and a physical and digital archive.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The previous assurance review gave an amber rating to the programme in March 2024, with actions linked to a timeline and pathway for the bringing down of the Grenfell Tower. Since then a decision was announced in February 2025 to take down the Grenfell Tower. The programme has also supported the launch of the Grenfell Tower Memorial Commission's Memorial Design Team Selection Process. The Department continues to progress the Grenfell Tower Memorial Commission's recommendations for Government and ensure the Grenfell community is supported over the longer term, working with local partners.","startDate":"2019-07-15","endDate":"2031-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/01/2030 to 31/03/2031. This is primarily due to the following factors‚ Following the DPMs decision to carefully take down Grenfell Tower and the launch of the Multi Disciplinary Design Team Selection Process, the Grenfell Programme is on track to deliver to agreed timelines. This includes an additional year to provide for deconstruction and construction contingency.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 43 - Commercial interests","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ Given the nature of the Programme, it has been agreed with NISTA that it would be insensitive and not appropriate to track monitised benefits.","themes":["Approvals & decisions","Commercial & supply chain","Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The previous assurance review gave an amber rating to the programme in March 2024, with actions linked to a timeline and pathway for the bringing down of the Grenfell…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"MHCLG_0001_1920-Q3","year":2026,"name":"GRENFELL SITE AND PROGRAMME","department":"MHCLG","category":"Infrastructure and Construction","description":"The Grenfell Tower fire was a national tragedy in which 72 people lost their lives, with a profound and lasting impact on the bereaved families, survivors and the wider community. The Grenfell Programme oversees the works to carefully take down the Grenfell Tower, and works with the Grenfell Tower Memorial Commission to deliver a fitting and lasting memorial that honours those who lost their lives, a second site to carefully lay the Tower to rest and an archive. The programme further remains committed to working with bereaved families, survivors, the immediate community, partners across government, health services and the Council to ensure that families and the community continue to receive the support they need in the long term.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The SRO Delivery Confidence Assessment rating at 25/26-Q4 remained at Amber. Delivery across the programme remains achievable, with active management of risks and issues. In November 2025, Freehaus was selected as the new Multi-Disciplinary Design Team (MDDT). The MDDT is in the process of developing a Memorial Design in collaboration with the community. Engagement with internal and external stakeholders remains critical and a core focus for the programme team.","startDate":"2019-07-15","endDate":null,"scheduleNarrative":"There has been no change to the schedule for the programme.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide costs/schedule information, Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Exempt under Section 43 - Commercial interests","themes":["Delivery & schedule","Commercial & supply chain","Scope & requirements","Governance & assurance"],"evidenceExcerpt":"The SRO Delivery Confidence Assessment rating at 25/26-Q4 remained at Amber. Delivery across the programme remains achievable, with active management of risks and issues. In November 2025, Freehaus was selected as the new Multi-Disciplinary Design Team (MDDT). The MDDT is in the process of developing a Memorial Design in collaboration with the community.…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"MHCLG_0001_1920-Q3","year":2025,"name":"GRENFELL SITE AND PROGRAMME","department":"MHCLG","category":"Infrastructure and Construction","description":"The Grenfell Programme continues to support the recovery of the Grenfell community and is currently preparing to carefully take down the Grenfell Tower. We continue to work in partnership with the Grenfell Tower Memorial Commission to deliver a fitting memorial, and deliver the Grenfell Tower Memorial Commission's other recommendations for Government, including the provision of a second site, where materials from the Tower not used in the memorial will be laid to rest and a physical and digital archive.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The previous assurance review gave an amber rating to the programme in March 2024, with actions linked to a timeline and pathway for the bringing down of the Grenfell Tower. Since then a decision was announced in February 2025 to take down the Grenfell Tower. The programme has also supported the launch of the Grenfell Tower Memorial Commission's Memorial Design Team Selection Process. The Department continues to progress the Grenfell Tower Memorial Commission's recommendations for Government and ensure the Grenfell community is supported over the longer term, working with local partners.","startDate":"2019-07-15","endDate":"2031-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/01/2030 to 31/03/2031. This is primarily due to the following factors‚ Following the DPMs decision to carefully take down Grenfell Tower and the launch of the Multi Disciplinary Design Team Selection Process, the Grenfell Programme is on track to deliver to agreed timelines. This includes an additional year to provide for deconstruction and construction contingency.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 43 - Commercial interests","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ Given the nature of the Programme, it has been agreed with NISTA that it would be insensitive and not appropriate to track monitised benefits.","themes":["Approvals & decisions","Commercial & supply chain","Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The previous assurance review gave an amber rating to the programme in March 2024, with actions linked to a timeline and pathway for the bringing down of the Grenfell…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":null,"attentionScore":18,"attentionReasons":["Current published delivery confidence is Amber"]},{"id":"HMRC_0164_2223-Q3","year":2026,"name":"HMRC NORTHERN IRELAND DELIVERY PROGRAMME","department":"HMRC","category":"Information and Communications Technology (ICT)","description":"The Northern Ireland Delivery Programme (NIDP) was established in April 2022 to continue delivery of HMRC policy and legislative commitments for Northern Ireland, following the United Kingdom's exit from the European Union. It includes delivery of the changes to HMRC systems to enable HMRC and businesses to operate within the terms of the Windsor Framework. It is a 5-year programme that is due to close by April 2027.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"NISTA's Delivery Confidence Assessment rating at 25/26-Q4 is Amber. This is primarily due to the following factors. The programme continues to progress delivery of commitments within the Windsor Framework, as agreed between the UK and the EU. The Amber delivery confidence assessment reflects that the programme is on track to complete delivery of the remaining scope during 2026/27, but there remain some technically complex changes to achieve before closure can be confirmed. Risks to delivery and closure plans are being managed within existing programme and departmental governance.","startDate":"2022-04-01","endDate":"2027-03-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remains scheduled to finish on 31/03/2027. This is primarily due to the following factors. Progress continues to be made with delivery against the programme strategic outcomes. Plans/expectations for 2026/27 to deliver the remaining scope and for closure of the programme are on track.","fyBaseline":123.11,"fyForecast":123.11,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%","wholeLifeCost":712.9,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmental-agree Whole Life Cost at 25/26-Q4 increased from £573.05m to £717.7m This is primarily due to the following factors. In April 2025 the programme lifecycle was extended by 2 years, to meet the latest legislative and ongoing commitments, as set out in the business case. The programme is now due to close in April 2027. The additional costs are for IT delivery, resourcing, live service and includes contingency, for the additional period.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. This is unchanged from when the business case was first baselined and reflects that the programme is managing changes to customs and indirect tax systems to comply with policy and legislative requirements.","themes":["Delivery & schedule","Cost & funding","Scope & requirements","Approvals & decisions"],"evidenceExcerpt":"NISTA's Delivery Confidence Assessment rating at 25/26-Q4 is Amber. This is primarily due to the following factors. The programme continues to progress delivery of commitments within the Windsor Framework, as agreed between the UK and the EU. The Amber delivery confidence assessment reflects that the programme is on track to complete delivery of the…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"HMRC_0164_2223-Q3","year":2023,"name":"HMRC Northern Ireland Programme","department":"HMRC","category":"ICT","description":"The NI Delivery Programme is managing changes to HMRC Customs and Indirect Tax systems to enable HMRC and traders to operate, within the terms of the Northern Ireland Protocol, now replaced by the Windsor Framework. Also, for the UK to remain aligned with other EU customs legislation for Northern Ireland.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 is Amber. This is primarily due to the following factors. Substantive progress continues to be made with delivery against the programme strategic outcomes. The 2023/24 delivery plans have been baselined and the announcement of the Windsor Framework in February 2023 has provided clarity on the way forward. The programme is reporting Amber, whilst it assesses the impacts of delivering the new Windsor Framework requirements against existing priorities.","startDate":"2022-04-01","endDate":"2025-03-31","scheduleNarrative":"The project's end-date at 22/23-Q4 is 2025-03-31. This is primarily due to the following factors. The programme is broadly on track to deliver during the lifecycle. The plans now also include delivery of HMRC Windsor Framework system requirements including for the 'green lane' for October 2024.","fyBaseline":163.8,"fyForecast":149.4,"fyVariance":-9.0,"varianceNarrative":"The costs of delivery in 2022/23 were lower than the original baseline mainly driven by elements that were paused due to the negotiations around the NI Protocol, the removal of some scope from programme baseline and the deferral of some elements of system re-platforming.","wholeLifeCost":388.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 22/23-Q4 is 388m. This is primarily due to the following factors. The project's departmentally-agreed Whole Life Cost at 22/23-Q4 is 388m. This is due to: The baselined whole life costs for the programme includes programme team resourcing, technology costs and on-going live service support to deliver the original scope of the programme. Delivering the system requirements for the new Windsor Framework will require additional funding over the next 2 years.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. The project did not provide departmental-agree monetised benefits at 22/23-Q4. The programme is managing changes to customs and indirect tax systems to comply with policy and legislative requirements","themes":["Cost & funding","Delivery & schedule","Scope & requirements","Technical & integration"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 is Amber. This is primarily due to the following factors. Substantive progress continues to be made with delivery against the programme strategic outcomes. The 2023/24 delivery plans have been baselined and the announcement of the Windsor Framework in February 2023 has…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"HMRC_0164_2223-Q3","year":2024,"name":"HMRC Northern Ireland Programme","department":"HMRC","category":"ICT","description":"The Northern Ireland Delivery Programme (NIDP) was established as part of HMRC's 2021 Spending Review settlement to continue delivery of HMRC policy and legislative commitments for Northern Ireland, following the United Kingdom's exit from the European Union. _x000D_ _x000D_ It includes delivery of the changes to HMRC systems to enable HMRC and businesses to operate initially within the terms of the Northern Ireland Protocol, and more recently in 2023, within the terms of the Windsor Framework.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The programme continues to progress delivery of commitments within the Windsor Framework to legislative timelines agreed between UK and EU. The Amber delivery confidence assessment reflect the overall scale and technical complexity of the programme, with risks that are being managed within existing programme and departmental governance.","startDate":"2022-04-01","endDate":"2025-03-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2025-03-31. This is primarily due to the following factors. Substantive progress continues to be made with delivery against the programme strategic outcomes; and our 2024/25 delivery plans are now finalised and are on track.","fyBaseline":216.14,"fyForecast":203.06,"fyVariance":-6.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The decrease is predominantly due to cost savings following reductions in supplier estimates as projects progress through their delivery life cycle; and delays with onboarding supplier resources, which has meant costs have been incurred later and at a slower rate, than initially forecast.","wholeLifeCost":498.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 increased from 388m. to 498m. This is primarily due to the following factors. The full lifecycle cost increase is predominantly due to a change in how overhead and non-functional costs are apportioned for projects that are making changes to the Customs Declaration Service. It also includes the additional of costs to deliver new scope requirements, since the Windsor Framework was announced in February 2023. There will be further additional costs for 2024/25 that have not yet been baselined.","benefits":0.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 0m. The programme is managing changes to customs and indirect tax systems to comply with policy and legislative requirements","themes":["Delivery & schedule","Cost & funding","Commercial & supply chain","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The programme continues to progress delivery of commitments within the Windsor Framework to legislative timelines agreed between UK and EU. The Amber delivery…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"HMRC_0164_2223-Q3","year":2025,"name":"HMRC NORTHERN IRELAND DELIVERY PROGRAMME","department":"HMRC","category":"ICT","description":"The Northern Ireland Delivery Programme (NIDP) was established in April 2022 to continue delivery of HMRC policy and legislative commitments for Northern Ireland, following the United Kingdom's exit from the European Union. It includes delivery of the changes to HMRC systems to enable HMRC and businesses to operate within the terms of the Windsor Framework.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors, The programme continues to progress delivery of commitments within the Windsor Framework and Union Customs Code, as agreed between the UK and the EU. The Amber delivery confidence assessment is consistent with previous reports, and reflects the overall scale and technical complexity of the programme, with risks that are being managed within existing programme and departmental governance.","startDate":"2022-04-01","endDate":"2027-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2025 to 31/03/2027. This is primarily due to the following factors, Substantive progress continues to be made with delivery against the programme strategic outcomes. However, since the 2023/24 transparency data was published, the lifecycle of the programme has been extended by 2 years to 2027 to meet current legislative and on-going commitments and fully deliver the strategic outcomes.","fyBaseline":180.8,"fyForecast":195.69,"fyVariance":8.24,"varianceNarrative":"The budget variance exceeds 5%. The programme progressed several large projects and changes during 2024/25, including completing required re-platforming of ageing excise systems. The in-year increase is the cumulative impact, where some of the early cost estimates have increased, as the projects have progressed through the IT change lifecycle.","wholeLifeCost":573.05,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 498 to 573. This is primarily due to the following factors, The increase is largely driven by changes in legislation that have introduced additional scope and costs and is off-set by lower costs in the original core scope.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors, The programme is managing changes to customs and indirect tax systems to comply with policy and legislative requirements.","themes":["Cost & funding","Delivery & schedule","Scope & requirements","Technical & integration"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors, The programme continues to progress delivery of commitments within the Windsor Framework and Union Customs Code, as agreed between the UK and the EU. The Amber…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"HMRC_0164_2223-Q3","year":2026,"name":"HMRC NORTHERN IRELAND DELIVERY PROGRAMME","department":"HMRC","category":"Information and Communications Technology (ICT)","description":"The Northern Ireland Delivery Programme (NIDP) was established in April 2022 to continue delivery of HMRC policy and legislative commitments for Northern Ireland, following the United Kingdom's exit from the European Union. It includes delivery of the changes to HMRC systems to enable HMRC and businesses to operate within the terms of the Windsor Framework. It is a 5-year programme that is due to close by April 2027.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"NISTA's Delivery Confidence Assessment rating at 25/26-Q4 is Amber. This is primarily due to the following factors. The programme continues to progress delivery of commitments within the Windsor Framework, as agreed between the UK and the EU. The Amber delivery confidence assessment reflects that the programme is on track to complete delivery of the remaining scope during 2026/27, but there remain some technically complex changes to achieve before closure can be confirmed. Risks to delivery and closure plans are being managed within existing programme and departmental governance.","startDate":"2022-04-01","endDate":"2027-03-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remains scheduled to finish on 31/03/2027. This is primarily due to the following factors. Progress continues to be made with delivery against the programme strategic outcomes. Plans/expectations for 2026/27 to deliver the remaining scope and for closure of the programme are on track.","fyBaseline":123.11,"fyForecast":123.11,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%","wholeLifeCost":712.9,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmental-agree Whole Life Cost at 25/26-Q4 increased from £573.05m to £717.7m This is primarily due to the following factors. In April 2025 the programme lifecycle was extended by 2 years, to meet the latest legislative and ongoing commitments, as set out in the business case. The programme is now due to close in April 2027. The additional costs are for IT delivery, resourcing, live service and includes contingency, for the additional period.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. This is unchanged from when the business case was first baselined and reflects that the programme is managing changes to customs and indirect tax systems to comply with policy and legislative requirements.","themes":["Delivery & schedule","Cost & funding","Scope & requirements","Approvals & decisions"],"evidenceExcerpt":"NISTA's Delivery Confidence Assessment rating at 25/26-Q4 is Amber. This is primarily due to the following factors. The programme continues to progress delivery of commitments within the Windsor Framework, as agreed between the UK and the EU. The Amber delivery confidence assessment reflects that the programme is on track to complete delivery of the…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"HMRC_0164_2223-Q3","year":2025,"name":"HMRC NORTHERN IRELAND DELIVERY PROGRAMME","department":"HMRC","category":"ICT","description":"The Northern Ireland Delivery Programme (NIDP) was established in April 2022 to continue delivery of HMRC policy and legislative commitments for Northern Ireland, following the United Kingdom's exit from the European Union. It includes delivery of the changes to HMRC systems to enable HMRC and businesses to operate within the terms of the Windsor Framework.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors, The programme continues to progress delivery of commitments within the Windsor Framework and Union Customs Code, as agreed between the UK and the EU. The Amber delivery confidence assessment is consistent with previous reports, and reflects the overall scale and technical complexity of the programme, with risks that are being managed within existing programme and departmental governance.","startDate":"2022-04-01","endDate":"2027-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2025 to 31/03/2027. This is primarily due to the following factors, Substantive progress continues to be made with delivery against the programme strategic outcomes. However, since the 2023/24 transparency data was published, the lifecycle of the programme has been extended by 2 years to 2027 to meet current legislative and on-going commitments and fully deliver the strategic outcomes.","fyBaseline":180.8,"fyForecast":195.69,"fyVariance":8.24,"varianceNarrative":"The budget variance exceeds 5%. The programme progressed several large projects and changes during 2024/25, including completing required re-platforming of ageing excise systems. The in-year increase is the cumulative impact, where some of the early cost estimates have increased, as the projects have progressed through the IT change lifecycle.","wholeLifeCost":573.05,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 498 to 573. This is primarily due to the following factors, The increase is largely driven by changes in legislation that have introduced additional scope and costs and is off-set by lower costs in the original core scope.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors, The programme is managing changes to customs and indirect tax systems to comply with policy and legislative requirements.","themes":["Cost & funding","Delivery & schedule","Scope & requirements","Technical & integration"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors, The programme continues to progress delivery of commitments within the Windsor Framework and Union Customs Code, as agreed between the UK and the EU. The Amber…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":0,"attentionScore":18,"attentionReasons":["Current published delivery confidence is Amber"]},{"id":"HO_0033_1415-Q3","year":2026,"name":"HOME OFFICE BIOMETRICS (HOB) PROGRAMME","department":"HO","category":"Information and Communications Technology (ICT)","description":"Home Office wide convergence programme for biometrics within Government. Home Office Biometrics systems manage unique, digitised and verified identities formed from an individual’s biometric data. The modalities currently used are fingerprint, facial image and DNA. They provide for the fast, accurate and reliable identification of individuals critical to business operations within Law enforcement, Immigration, Borders, Passport and Criminal Justice.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared with Q4 2024/25, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at Q4 2025/26 remains Amber. This reflects the complexity of the Home Office Biometrics (HOB) Programme, which continues to deliver against a broad set of stakeholder requirements within a complex supplier landscape. During 2025/26, the programme has made measurable progress, including successful delivery of key milestones such as Strategic Matcher Stage 1. While challenges remain, the programme continues to advance delivery in line with its overall objectives.","startDate":"2014-04-01","endDate":"2026-12-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same. This is primarily due to the following factors‚ delivery has remained on track and activity to transition to a Biometric Service has been progressed to plan in preparation for closure of the programme.","fyBaseline":110.04,"fyForecast":107.03,"fyVariance":2.74,"varianceNarrative":"The budget variance is less than or equal to 5%","wholeLifeCost":1809.85,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) increase from £1,561m to £1,746m. This is primarily due to the following factors: Increase in programme cost, additional year reported and increase in Business As Usual (BAU)/Live Run cost.","benefits":1309.81,"benefitsNarrative":"Compared to financial year 24/25-Q4, the programmes departmentally agreed Benefits at 25/26-Q4 increased slightly from £110m in 24/25 to £117m in 25/26. This is primarily due to an updated benefits profile, including increased benefits associated with fingerprint matching.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Governance & assurance"],"evidenceExcerpt":"Compared with Q4 2024/25, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at Q4 2025/26 remains Amber. This reflects the complexity of the Home Office Biometrics (HOB) Programme, which continues to deliver against a broad set of stakeholder requirements within a complex supplier landscape. During 2025/26, the programme has made measurable…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"HO_0033_1415-Q3","year":2020,"name":"Home Office Biometrics (HOB) Programme","department":"HO","category":"ICT","description":"Home Office wide convergence programme for biometrics within Government, covering border security, law enforcement and intelligence.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber, which has declined since last year�s Q2 1819 Amber/Green, due primarily to the following factors; - Recognising that the programme was now well advanced, there was a need for an increasing focus on ensuring commitment from the various users of the new services to benefits realisation and reporting of achievements. During 19/20 work has been focused on benefits realisation with commitments sought from key stakeholders and regular updates provided at the programme board. - During 19/20 HOB embedded the customer board and work has begun to develop the design of the future HOB Product Organisation. This will inform the programme approach for transition and closure. Since the Q2 1920 (30th September 2019) Amber IPA DCA, the following non-project operating environment activities have impacted the original Q2 IPA DCA; - HOB Continues to face some affordability challenges. Due to the slippage of milestone payments to supplier, these will be pushed into 20/21 making the budget for the next FY extremely challenging. Since the Q2 1920 (30th September 2019) Amber IPA DCA, the following primary project actions have impacted the original Q2 IPA DCA; - Since September 2019, HOB has recruited 11 additional Civil Servants to the programme to replace contingent resources working in project delivery roles, this will reduce the cost impact on the programme. The HOB programme has undertaken two recruitment activities to secure a dedicated, skilled and experienced Benefits Manager. Both recruitments were unsuccessful. - An interim HOB Benefits Manager was appointed and has worked with business design colleagues, to review and validate the assumptions, evidence and certainty underpinning each programme level benefits. These have been reflected as updated benefit profiles within the Benefit Realisation Plan in the 19/20 Programme Business Case and agreed with benefit owners at individual project boards. - The programme has also embedded benefits reporting (both delivered and forecast benefits) into its internal governance and continued to report quarterly at the Programme Board. The Programme now assesses the impact upon business benefits as an integral part of any critical decisions related changes to project scope, quality, cost and timelines.","startDate":"2014-04-01","endDate":"2021-09-30","scheduleNarrative":"The scheduled baseline project end date at Q2 1920 (30th September 2019) is 30/09/21, has lengthened by 548 days since last year's Q2 1819 date of 31/03/20, due primarily to the following factors; - The Programme completion date was extended to September 2021 to complete existing Strategic Projects, as indicated in the latest Programme Business Case. Since the Q2 1920 (30th September 2019) baseline project end date of 30/09/21, the following non-project operating environment activities have impacted the original Q2 baseline project end date; - HOB programme team are currently working from home due to the outbreak of COVID-19. The programme is looking at the impact of the current situation on HOB suppliers to assess their ability to deliver to the current milestones. Since the Q2 1920 (30th September 2019) baseline project end date of 30/09/21, the following primary project actions have impacted the original Q2 baseline project end date; - HOB Strategic Matcher (Fingerprints) Platform Go-Live moved to December 2020 as a key supplier is unable to meet the agreed Multi-Supplier Implementation Plan. - HOB DNA New Hosting Environment Go-Live has moved to June 2020 due to impact of time lost while developing a remote access solution for project staff because of COVID 19 working from home requirements - UK Prum fingerprints system Go-Live has moved to June 2020. The EU Parliament have been given an additional month to MEPs to approve the UK Prum fingerprints system, resulting in the delay. Given the overall delay to the Strategic Matcher project the programme end date is currently under review and may potentially be pushed back by six months to March 2022. This is currently being worked through.","fyBaseline":85.56,"fyForecast":85.56,"fyVariance":0.0,"varianceNarrative":"Budget variance less than 5%","wholeLifeCost":869.7,"costNarrative":"The baseline Whole Life Cost at Q2 1920 (30th September 2019) is �869.70 m, has increased by �27.33 m since last year's Q2 1819 (�m) baseline Whole Life Cost of �842.37 m, due primarily to the following factors; - The 18/19 Programme Business Case return was prior to the key procurement and contract awards. The 19/20 return aligns to the latest Programme Business Case and includes the preferred bidder costs which has increased overall programme costs. - In addition to this the 19/20 return incudes an additional year, (19-20 to 29/30) whereas 18/19 only included business as usual costs up to 28/29.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Governance & assurance"],"evidenceExcerpt":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber, which has declined since last year�s Q2 1819 Amber/Green, due primarily to the following factors; - Recognising that the programme was now well advanced, there was a need for an increasing focus on ensuring commitment from the various users of the new services to…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2020","sourceLabel":"IPA Annual Report 2019-20"},{"id":"HO_0033_1415-Q3","year":2021,"name":"Home Office Biometrics (HOB) Programme","department":"HO","category":"ICT","description":"Home Office wide convergence programme for biometrics within Government, covering border security, law enforcement and intelligence.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating increased from Amber to Amber/red. This is primarily due to the following factors: Over the last year the programme has made good progress on key deliverables, including the delivery of new capabilities, the decommissioning of legacy systems and the transition to new suppliers. However, delivery of the Matcher Project continues to be challenging and ongoing delays to testing activity and data migration may impact timelines and the programme's ability to achieve the projected closure date of March 2022.","startDate":"2014-04-01","endDate":"2022-03-31","scheduleNarrative":"Compared to financial year 19/20-Q2, the project's end-date increased from 30 September 2021 to 31 March 2022 . This is primarily due to the following factors: As part of the HOB Programme Business Case, approval was given to extend the end date of the programme from September 2021 to March 2022 to manage the now later and staged delivery of Strategic Matcher capabilities.","fyBaseline":90.6,"fyForecast":90.6,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":1006.27,"costNarrative":"Compared to financial year 19/20-Q2, the projects Baseline Whole Life Cost increased from �869.70m to �1006.27m. This is primarily due to the following factors: The WLC's have increased from the 2019/20 Q2 position as a result of additions to scope, additional funding requirements and the extension of the programme end date.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Technical & integration","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating increased from Amber to Amber/red. This is primarily due to the following factors: Over the last year the programme has made good progress on key deliverables, including the delivery of new capabilities, the decommissioning of legacy systems and…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21"},{"id":"HO_0033_1415-Q3","year":2022,"name":"Home Office Biometrics (HOB) Programme","department":"HO","category":"ICT","description":"Home Office wide convergence programme for biometrics within Government, covering border security, law enforcement and intelligence.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 decreased from Amber/red to Amber. Following an internal review in September 2021 six recommendations were made to support programme delivery. Five of the recommendations have been completed and closed with working ongoing to complete and close the final recommendation.","startDate":"2014-04-01","endDate":"2024-09-30","scheduleNarrative":"Compared to 2021-Q4, your project end-date increased from 31 MAR 2022 to 30 SEP 2024 . This is primarily due to the following factors: The programme has successfully completed a number of key projects delivering enhanced biometrics capability for the Home Office and Law Enforcement. There have been challenges with the delivery of the Strategic Matcher project but work is ongoing to resolve these and all other aspect of Programme delivery continues as planned with some interim solutions being used.","fyBaseline":76.5,"fyForecast":76.5,"fyVariance":0.0,"varianceNarrative":"The budget variance is inferior or equal to 5%. Since the beginning of the financial year and budget setting, Strategic Matcher was subject to a further replan with a go live date beyond 21/22. This resulted in a number of milestones moving from 21/22 to 22/23 and generating a significant underspend in the current year. Additionally despite a successful cutover with the new supplier the delivery of project change work on the Immigration and Asylum Biometric System and IDENT1 has been much slower than envisaged. This has caused milestone delivery delays across numerous projects and has driven up the underspend.","wholeLifeCost":1148.0,"costNarrative":"Compared to2021-Q4, the projects Baseline Whole Life Cost increased from 1006.27 (£m) to 1147.52 (£m). This is primarily due to the following factors: The whole life programme costs include legacy systems projects, business as usual costs and Strategic projects as part of the profiled figures to ensure implementation of the programmes objectives and sustainment of biometric capabilities.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 decreased from Amber/red to Amber. Following an internal review in September 2021 six recommendations were made to support programme delivery. Five of the recommendations have been completed and closed with working ongoing to…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"HO_0033_1415-Q3","year":2023,"name":"Home Office Biometrics (HOB) Programme","department":"HO","category":"ICT","description":"Home Office wide convergence programme for biometrics within Home Office, covering border security, law enforcement and intelligence","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. A review at the end of March 2023 delivered an Amber rating. Since the previous review all recommendations have been completed and good progress has been made in the delivery of key projects and the re-procurement to replace the strategic matcher supplier. There remain supplier challenges which could impact the programme but these are being carefully managed and addressed by the programme team to ensure delivery through 23/24 remains on track.","startDate":"2014-04-01","endDate":"2025-03-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 increased from 2024-09-30 to 2025-03-31. This is primarily due to the following factors. The programme has successfully delivered a number of key projects during 22 / 23, however the Programme end date has been impacted by challenges to the delivery of the Strategic Matcher Project, and the decision to run the delivery contract through to a conclusion in February 2023. The later end date is to provide a smooth transition to the new supplier subject detailed negotiations as part of the procurement process and accommodate the now later and staged delivery of Strategic Matcher capabilities, and ensure completion of the programmes strategic scope.","fyBaseline":85.9,"fyForecast":85.9,"fyVariance":0.0,"varianceNarrative":"The budget variance is inferior or equal to 5%. Not required as variance is less than 5%.","wholeLifeCost":1222.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 increased from 1148m. to 1222m. This is primarily due to the following factors. Challenges delivering the Strategic Matcher Project and increased costs for overall delivery, including increased costs for the new supplier for Strategic Matcher and the extension to the Programme End Date.","benefits":1002.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 1002m. The project's departmental-agree monetised benefits at 22/23-Q4 is 1002m. The HOB programme will provide significant quantified non cashable benefits. The programme is a key enabler for business areas and benefits will be directly visible to a variety of end users.","themes":["Delivery & schedule","Commercial & supply chain","Cost & funding","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. A review at the end of March 2023 delivered an Amber rating. Since the previous review all recommendations have been completed and good progress has been made in the…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"HO_0033_1415-Q3","year":2024,"name":"Home Office Biometrics (HOB) Programme","department":"HO","category":"ICT","description":"Home Office wide convergence programme for biometrics within the Home Office, covering border security, law enforcement and intelligence.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 22/23-Q4, the Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber(SRO rating). This is primarily due to the following factors. The last review of the programme in March 2023 delivered an Amber rating. Since the previous review all recommendations have been completed and good progress has been made in the delivery of projects. The procurement and transition to a new supplier for Strategic Matcher has also completed. There remain supplier challenges and competing priorities which could impact the programme but these are being carefully managed and addressed by the programme team to ensure delivery through 24/25 remains on track.","startDate":"2014-04-01","endDate":"2026-03-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 increased from 2025-03-31 to 2026-03-31. This is primarily due to the following factors. The programme has made significant delivery progress during 23 / 24, including successful transition to the new Strategic Matcher supplier.","fyBaseline":95.1,"fyForecast":86.5,"fyVariance":-9.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. Not required as variance is less than 5%","wholeLifeCost":1339.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 increased from 1222m. to 1339m. This is primarily due to the following factors. Challenges delivering the Strategic Matcher project, including increased costs for overall delivery.","benefits":1131.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 2324-Q4 increased from 1002m. to 1131m. The HOB programme will provide significant quantified non cashable benefits. The programme is a key enabler for business areas and benefits will be directly visible to a variety of end users.","themes":["Delivery & schedule","Cost & funding","Commercial & supply chain","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber(SRO rating). This is primarily due to the following factors. The last review of the programme in March 2023 delivered an Amber rating. Since the previous review all recommendations have been completed and good progress has been made in the delivery…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"HO_0033_1415-Q3","year":2025,"name":"HOME OFFICE BIOMETRICS (HOB) PROGRAMME","department":"HO","category":"ICT","description":"Home Office Biometrics systems manage unique, digitised and verified identities formed from an individual’s biometric data. The modalities currently used are fingerprint, facial image and DNA. They provide for the fast, accurate and reliable identification of individuals critical to business operations within Immigration, Borders, Passport and Criminal Justice.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The Home Office Biometric (HOB) Programme is a complex programme that is meeting needs of a wide range of stakeholders while managing of a complex supplier landscape. In 2024/25 the programme has successfully delivered several key milestones including the Immigration and Asylum Biometric System (IABS) transitioning to the cloud.","startDate":"2014-04-01","endDate":"2026-12-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2026 to 31/12/2026. This is primarily due to the following factors‚ Earlier delivery of Strategic Matcher Stage 3 which has been bought forward to align with a Data Centre closure. This pushed Strategic Matcher Stage 2 into a later delivery at the end of 2026. The extension to the end date also allows for further IDENT1 modernisation work and ensures the Programme can complete all closure activity.","fyBaseline":89.5,"fyForecast":98.8,"fyVariance":10.39,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The 2024/25 budget allocation was lower than required due to wider portfolio pressures and decisions. The programme went into the FY with programming pressure which was higher than normal. In addition, due to dependencies on the programme such as Electronic Travel Authorisation (ETA) prioritisation, delivery of Cloud Transformation proved to be more expensive.","wholeLifeCost":1550.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 1339 to 1550. This is primarily due to the following factors‚ The increase in whole life costs is due to increased costs for project deliveries, the extension of the programme date and other year on year changes. This includes run cost increases which are driven by supplier costs and market forces.","benefits":1131.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 1131. This is primarily due to the following factors‚ Following the annual review, there have been no changes in the benefits delivered by the programme.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The Home Office Biometric (HOB) Programme is a complex programme that is meeting needs of a wide range of stakeholders while managing of a complex supplier landscape.…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"HO_0033_1415-Q3","year":2026,"name":"HOME OFFICE BIOMETRICS (HOB) PROGRAMME","department":"HO","category":"Information and Communications Technology (ICT)","description":"Home Office wide convergence programme for biometrics within Government. Home Office Biometrics systems manage unique, digitised and verified identities formed from an individual’s biometric data. The modalities currently used are fingerprint, facial image and DNA. They provide for the fast, accurate and reliable identification of individuals critical to business operations within Law enforcement, Immigration, Borders, Passport and Criminal Justice.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared with Q4 2024/25, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at Q4 2025/26 remains Amber. This reflects the complexity of the Home Office Biometrics (HOB) Programme, which continues to deliver against a broad set of stakeholder requirements within a complex supplier landscape. During 2025/26, the programme has made measurable progress, including successful delivery of key milestones such as Strategic Matcher Stage 1. While challenges remain, the programme continues to advance delivery in line with its overall objectives.","startDate":"2014-04-01","endDate":"2026-12-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same. This is primarily due to the following factors‚ delivery has remained on track and activity to transition to a Biometric Service has been progressed to plan in preparation for closure of the programme.","fyBaseline":110.04,"fyForecast":107.03,"fyVariance":2.74,"varianceNarrative":"The budget variance is less than or equal to 5%","wholeLifeCost":1809.85,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) increase from £1,561m to £1,746m. This is primarily due to the following factors: Increase in programme cost, additional year reported and increase in Business As Usual (BAU)/Live Run cost.","benefits":1309.81,"benefitsNarrative":"Compared to financial year 24/25-Q4, the programmes departmentally agreed Benefits at 25/26-Q4 increased slightly from £110m in 24/25 to £117m in 25/26. This is primarily due to an updated benefits profile, including increased benefits associated with fingerprint matching.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Governance & assurance"],"evidenceExcerpt":"Compared with Q4 2024/25, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at Q4 2025/26 remains Amber. This reflects the complexity of the Home Office Biometrics (HOB) Programme, which continues to deliver against a broad set of stakeholder requirements within a complex supplier landscape. During 2025/26, the programme has made measurable…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"HO_0033_1415-Q3","year":2025,"name":"HOME OFFICE BIOMETRICS (HOB) PROGRAMME","department":"HO","category":"ICT","description":"Home Office Biometrics systems manage unique, digitised and verified identities formed from an individual’s biometric data. The modalities currently used are fingerprint, facial image and DNA. They provide for the fast, accurate and reliable identification of individuals critical to business operations within Immigration, Borders, Passport and Criminal Justice.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The Home Office Biometric (HOB) Programme is a complex programme that is meeting needs of a wide range of stakeholders while managing of a complex supplier landscape. In 2024/25 the programme has successfully delivered several key milestones including the Immigration and Asylum Biometric System (IABS) transitioning to the cloud.","startDate":"2014-04-01","endDate":"2026-12-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2026 to 31/12/2026. This is primarily due to the following factors‚ Earlier delivery of Strategic Matcher Stage 3 which has been bought forward to align with a Data Centre closure. This pushed Strategic Matcher Stage 2 into a later delivery at the end of 2026. The extension to the end date also allows for further IDENT1 modernisation work and ensures the Programme can complete all closure activity.","fyBaseline":89.5,"fyForecast":98.8,"fyVariance":10.39,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The 2024/25 budget allocation was lower than required due to wider portfolio pressures and decisions. The programme went into the FY with programming pressure which was higher than normal. In addition, due to dependencies on the programme such as Electronic Travel Authorisation (ETA) prioritisation, delivery of Cloud Transformation proved to be more expensive.","wholeLifeCost":1550.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 1339 to 1550. This is primarily due to the following factors‚ The increase in whole life costs is due to increased costs for project deliveries, the extension of the programme date and other year on year changes. This includes run cost increases which are driven by supplier costs and market forces.","benefits":1131.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 1131. This is primarily due to the following factors‚ Following the annual review, there have been no changes in the benefits delivered by the programme.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The Home Office Biometric (HOB) Programme is a complex programme that is meeting needs of a wide range of stakeholders while managing of a complex supplier landscape.…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":0,"attentionScore":18,"attentionReasons":["Current published delivery confidence is Amber"]},{"id":"HMRC_0017_1617-Q2","year":2026,"name":"MAKING TAX DIGITAL","department":"HMRC","category":"Information and Communications Technology (ICT)","description":"Making Tax Digital is a major transformation programme delivering whole system change to the administration of VAT and Income Tax Self-Assessment (ITSA) tax regimes that will change how millions of customers manage their taxes and interact with HMRC. MTD supports the digitisation and productivity of UK businesses in the 21st century economy. Its aim is to make it easier for businesses to get their tax right and make the calculation and payment of tax simpler through a transformed modern, digital tax service. It will change customer record keeping behaviour by requiring mandated customers to keep digital records and provide quarterly updates to HMRC. This will improve business record keeping and encourage compliant behaviour, whilst providing businesses with a modern digital experience. The MTD programme will drive digital adoption amongst the UK’s small business population to reduce error in tax and financial administration, supporting productivity and growth. It directly supports the government’s priorities to modernise the tax system, improve customer services, and to close the tax gap by raising billions in additional tax revenue to fund public services.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Amber delivery status recognises that the programme continues to navigate a challenging and complex delivery environment but remains on track to deliver successfully with robust risk mitigation plans in place. Over the last year, MTD continued to meet all key delivery and readiness milestones and a successful testing phase has further demonstrated service and operational readiness. A sustained engagement campaign has resulted in strong agent and customer awareness, and customer sign-ups are in line with forecast trajectories required to realise 26/27 benefits. The MTD Programme Board formally reviewed agreed key readiness criteria in September 2025 and January 2026, confirming the programme remained on track to go live from April 2026 with the first mandated cohort. Independent assurance has been secured through an Internal Audit review and the NISTA Gate 0/4 review. Both concluded that the programme is in a strong readiness position, with all key criteria met for go live. ​","startDate":"2016-04-01","endDate":"2029-03-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same. The programme remains on track to deliver the costed scope as set out in its current business case by March 2029.","fyBaseline":138.06,"fyForecast":137.59,"fyVariance":0.34,"varianceNarrative":"The budget variance is less than 5%.","wholeLifeCost":1484.62,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) decreased from £1,439.11m to £1,389.46m. This reflects the current scope of the programme, following some minor in year changes.","benefits":4477.49,"benefitsNarrative":"Overall programme benefits increased by £280m, driven by a combination of policy changes announced at Spring Statement and Autumn Budget 2025 (in particular those relating to Penalty Reform), revised customer costs/saving estimates, and refreshed determinants and population statistics.","themes":["Cost & funding","Governance & assurance","Delivery & schedule","Scope & requirements"],"evidenceExcerpt":"The Amber delivery status recognises that the programme continues to navigate a challenging and complex delivery environment but remains on track to deliver successfully with robust risk mitigation plans in place. Over the last year, MTD continued to meet all key delivery and readiness milestones and a successful testing phase has further demonstrated…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"HMRC_0017_1617-Q2","year":2020,"name":"Making Tax Digital for Business","department":"HMRC","category":"ICT","description":"Delivering modernised IT to digitise tax reporting for businesses and agents and delivering a better customer experience.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber/Green, which has improved since last year�s Q2 1819 Amber/Red, due primarily to the following factors; - Increased confidence in the performance of the VAT Service. - Development of the Income Tax Self-Assessment (ITSA) service for existing customers and refinement of plans for future mandation, subject to ministerial approval. Since the Q2 1920 (30th September 2019) Amber/Green IPA DCA, the following non-project operating environment activities have impacted the original Q2 IPA DCA; - The COVID-19 (Coronavirus) pandemic and EU Transition resource are providing significant challenges in relation to programme, stakeholder and supplier resource which may impact on the successful delivery of the Programme plans which we are currently managing. Since the Q2 1920 (30th September 2019) Amber/Green IPA DCA, the following primary project actions have impacted the original Q2 IPA DCA; - No primary project actions have impacted the original Q2 IPA DCA","startDate":"2016-04-01","endDate":"2024-03-31","scheduleNarrative":"The scheduled baseline project end date at Q2 1920 (30th September 2019) is 31/03/24, has lengthened by 1096 days since last year's Q2 1819 date of 31/03/21, due primarily to the following factors; - The project end date of 31/03/21 in Q2 2018 return was based on a 5-year project implementation window which started in April 2016. Following a scope change to the programme business case approved by HM Treasury in September 2018, the project end date was revised to 31/03/23. At this stage, we were scoring 4 years of Additional Tax Revenue (ATR) savings from 2019-20 to 2022-23 in line with publicly available estimates ratified by the Office for Budget Responsibility (OBR). The OBR ratified a further year of ATR savings at Autumn Budget 2018, so we have amended the project end date to 31/03/24 in Q2 2019, in line with HM Treasury Green Book methodology. Since the Q2 1920 (30th September 2019) baseline project end date of 31/03/24, the following non-project operating environment activities have impacted the original Q2 baseline project end date; - There are no activities impacting. Since the Q2 1920 (30th September 2019) baseline project end date of 31/03/24, the following primary project actions have impacted the original Q2 baseline project end date; - There have not been any project actions impacting.","fyBaseline":75.26,"fyForecast":78.96,"fyVariance":5.0,"varianceNarrative":"The 19/20 in-year baseline / forecast variance at Q2 1920 (30th September 2019) of 5%, is due primarily to the following factors; - Increased requirement of �6.2m to complete planned deliverables in 2019/20. - HMRC business group costs reduced by �5.03m Since the Q2 1920 (30th September 2019) 19/20 in-year baseline / forecast variance of 5%, the following non-project operating environment activities have impacted the original Q2 19/20 in-year baseline / forecast variance; - Programme spending has been impacted by supplier resource constraints Since the Q2 1920 (30th September 2019) 19/20 in-year baseline / forecast variance of 5%, the following primary project actions have impacted the original Q2 19/20 in-year variance; - HMT approved an updated baseline for the programme","wholeLifeCost":402.07,"costNarrative":"The baseline Whole Life Cost at Q2 1920 (30th September 2019) is �402.07 m, has increased by �67.59 m since last year's Q2 1819 (�m) baseline Whole Life Cost of �334.48 m, due primarily to the following factors; - Programme cost increased due to higher paybill, change in delivery solution and technology efficiencies assumed during prioritisation not materialising. - Business group estimated costs updated. Since the Q2 1920 (30th September 2019) �402.07 m baseline Whole Life Cost, the following non-project operating environment activities have impacted the original baseline Q2 Whole Life Cost; - No impact from non-project operating environment activities Since the Q2 1920 (30th September 2019) �402.07 m baseline Whole Life Cost, the following primary project actions have impacted the original Q2 baseline Whole Life Cost; - Updated programme costs to take account of higher costs of manual workarounds by operational teams, change of delivery solution, and technology efficiencies assumed during prioritisation not materialising.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Workforce & capability","Approvals & decisions"],"evidenceExcerpt":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber/Green, which has improved since last year�s Q2 1819 Amber/Red, due primarily to the following factors; - Increased confidence in the performance of the VAT Service. - Development of the Income Tax Self-Assessment (ITSA) service for existing customers and…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2020","sourceLabel":"IPA Annual Report 2019-20"},{"id":"HMRC_0017_1617-Q2","year":2021,"name":"Making Tax Digital","department":"HMRC","category":"ICT","description":"Delivering modernised IT to digitise tax reporting and improve the customer experience for businesses, agents and individuals","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating increased from Amber/Green to Amber. This is primarily due to the following factors: The Delivery Confidence Assessment is Amber as the scale of Income Tax Self Assessment (ITSA) deliveries increased, delivery to a challenging plan for VAT was maintained and work was completed to legislate for Penalty Reform to harmonise penalties across tax regimes - against a back drop of churn within the programme which required recruitment exercises and subsequently the onboarding and training of new team members. Nevertheless, the MTD schedule remained on track with the ITSA pilot to be delivered on schedule, the Finance Bill (March 2021) including primary legislation for the mandation of MTD for smaller VAT businesses and the government announcing its intention to legislate for Penalty Reform in Spring Budget 2021.","startDate":"2016-04-01","endDate":"2025-03-31","scheduleNarrative":"Compared to financial year 19/20-Q2, the project's end-date increased from 31 March 2024 to 31 March 2025 . This is primarily due to the following factors: The Programme Business Case approved by HM Treasury in September 2020 extended the lifecycle of the programme to March 2025, to include scope for Income Tax Self Assessment (ITSA) mandation VAT enhancements & Penalty Reform to harmonise penalties across tax regimes","fyBaseline":121.43,"fyForecast":113.5,"fyVariance":-7.0,"varianceNarrative":"The budget variance exceeds 5%. There was an underspend in the cost requirements for Business Groups to support MTD related solution design, delivery and implementation. The assurance and forecasting processes have been improved throughout the year, improving the confidence in future Business Group requirements.","wholeLifeCost":775.73,"costNarrative":"Compared to financial year 19/20-Q2, the projects Baseline Whole Life Cost increased from �402.07m to �775.73m. This is primarily due to the following factors: The Programme's baseline whole-life cost increased from Quarter 2 of 2019-20 to reflect, the additional complexity to deliver ITSA, the identification of support line costs for VAT and the extension of the programme by an extra year. A new iteration of the Programme Business Case is in development. Once the new version of the Business Case receives HM Treasury approval, the baseline position will once again be revised to align. The project level business cases are also under construction.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating increased from Amber/Green to Amber. This is primarily due to the following factors: The Delivery Confidence Assessment is Amber as the scale of Income Tax Self Assessment (ITSA) deliveries increased, delivery to a challenging plan for VAT was…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21"},{"id":"HMRC_0017_1617-Q2","year":2022,"name":"Making Tax Digital","department":"HMRC","category":"ICT","description":"Making Tax Digital aims to improve business record keeping providing businesses with a modern digital experience, encouraging compliant behaviour and acting as a building block to HMRC's transformation plans.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 20/21-Q4, the Delivery Confidence Assessment rating at 21/22-Q4 remained at Amber The scale of the Income Tax Self Assessment (ITSA) delivery is challenging due to its complexity, size and scope. The complexity of some VAT customer records and IT system migration challenges have resulted in Penalty Reform for VAT moving to January 2023 which was confirmed in the February 2022 Written Ministerial Statement. The Programme Director, appointed in May 2021, continues to lead Making Tax Digital Programme whilst being ably supported by his experienced Senior Leadership Team.","startDate":"2016-04-01","endDate":"2025-04-01","scheduleNarrative":"Compared to 2021-Q4, your project end-date increased from 31 MAR 2025 to 01 APR 2025 . This is primarily due to the following factors: Making Tax Digital (MTD) current scope includes Income Tax Self Assessment mandation for businesses and landlords with a turnover of £10k (excluding partnerships), VAT enhancements and Penalty Reform to harmonise penalties across tax regimes. MTD aims to support UK businesses to go digital and provide them with a modern digital experience, encouraging compliant behaviour and act as a building block to HMRC's transformation plans.","fyBaseline":150.98,"fyForecast":142.11,"fyVariance":-6.0,"varianceNarrative":"The budget variance exceeds 5%. A contingency element was included within the MTD budget allocation in 2021-22 which was not required. There was also an underspend of the cost requirements for Business Groups to support MTD related solution design, delivery and implementation. The assurance and forecasting processes have developed this year, and work continues to improve the confidence in future Business Group requirements.","wholeLifeCost":885.0,"costNarrative":"Compared to2021-Q4, the projects Baseline Whole Life Cost increased from 775.73 (£m) to 885.07 (£m). This is primarily due to the following factors: The baseline costs were increased to reflect the latest scope for the next phase of MTD across VAT, ITSA and Penalty Reform as set out in the current Programme Business Case that was signed off by HMT Treasury Approval Point in June 2021. A new iteration of the Programme Business Case is in development. Once the new version of the Business Case receives HM Treasury approval, the baseline position will be revised to align.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Approvals & decisions","Technical & integration","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Delivery Confidence Assessment rating at 21/22-Q4 remained at Amber The scale of the Income Tax Self Assessment (ITSA) delivery is challenging due to its complexity, size and scope. The complexity of some VAT customer records and IT system migration challenges have resulted in Penalty Reform for VAT moving to January…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"HMRC_0017_1617-Q2","year":2023,"name":"Making Tax Digital","department":"HMRC","category":"ICT","description":"Making Tax Digital aims to improve business record keeping providing businesses with a modern digital experience, encouraging compliant behaviour and acting as a building block to HMRC's transformation plans.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber (IPA rating). This is primarily due to the following factors. The Income Tax Self Assessment is challenging due to its size and complexity and the Written Ministerial Statement in December 2022 confirmed the phased delivery of mandation from 2026. MTD successfully transitioned MTD for VAT to business as usual in October 2022, and Penalty Reform for VAT went live in January 2023. MTD is redesigning and streamlining its programme structure to gain better transparency of plans and co creation with software developers to achieve successful outcomes for all our customers and agents.","startDate":"2016-04-01","endDate":"2028-03-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 increased from 2025-04-01 to 2028-03-31. This is primarily due to the following factors. Making Tax Digital (MTD) current scope includes Income Tax Self Assessment mandation, VAT enhancements and Penalty Reform to harmonise penalties across tax regimes. MTD aims to support UK businesses to go digital and provide them with a modern digital experience, encouraging compliant behaviour and act as a building block to HMRCs transformation plans.","fyBaseline":153.15,"fyForecast":149.36,"fyVariance":-2.0,"varianceNarrative":"The budget variance is inferior or equal to 5%.","wholeLifeCost":885.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 remained at 885m. This is primarily due to the following factors. The baseline costs reflect the scope for MTD across VAT, ITSA and Penalty Reform as set out in the Programme Business Case that was signed off by HMT Treasury Approval Point in June 2021. A new iteration of the Programme Business Case is in development. Once the new version of the Business Case receives TAP approval, the baseline position will be revised to align.","benefits":2146.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 2146m. The project's departmentally-agreed monetised benefits at 22/23-Q4 is 2145.84m. This is due to: The benefits represent additional tax revenue and customer cost savings","themes":["Cost & funding","Approvals & decisions","Technical & integration","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber (IPA rating). This is primarily due to the following factors. The Income Tax Self Assessment is challenging due to its size and complexity and the Written Ministerial Statement in December 2022 confirmed the phased delivery of mandation from 2026.…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"HMRC_0017_1617-Q2","year":2024,"name":"Making Tax Digital","department":"HMRC","category":"ICT","description":"\"Making Tax Digital aims to support UK businesses and landlords to get their VAT and Income Tax right by mandating them to keep up-to-date business records, using business accounting software that produces the VAT return or Self Assessment update to HMRC._x000D_ \"","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The Amber delivery status recognises that the programme continues to navigate a challenging and complex delivery environment. Over the last year, the programme took significant steps to improve overall delivery confidence. This included embedding a new operational model of multi-functional teams to drive delivery velocity; strengthening internal and external assurance through updated governance structures; and reinvigorating stakeholder engagement and readiness through co-design of the service._x000D_ _x000D_ The programme is taking proactive steps to mitigate these challenges. This includes developing robust contingency plans and exploring options to accelerate build, testing and migration. The programme is on track to ramp up customer volumes in the 24/25 testing period which will support the testing of critical customer journeys.","startDate":"2016-04-01","endDate":"2028-03-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2028-03-31. This is primarily due to the following factors. The programme remains on track to deliver the costed scope as set out in its current business case by March 2028.","fyBaseline":132.62,"fyForecast":124.89,"fyVariance":-6.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The underspend during the year was as a result of:_x000D_ . Baseline figures included a contingency which was not utilised as a result of the programmes adherence to delivery plans._x000D_ . Improved ways of working which has driven efficiency so that we have not needed / been required to deploy the same level of resource on the programme as we had anticipated based on prior ways of working. _x000D_ . Reduction in resource requirements for some manual workarounds due to the mitigations delivered by the programme and key stakeholders.","wholeLifeCost":1272.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 increased from 885m. to 1272m. This is primarily due to the following factors. . Revised delivery plan following Written Ministerial Statement (WMS) in December 2022 which gave consideration to lessons learned from MTD VAT with a multi release delivery for ITSA allowing for full E2E testing_x000D_ . Inclusion of an additional 2 years of costs for 2026/27 and 2027/28_x000D_ . Additional year build for VAT and subsequent impact on Penalty Reform","benefits":6278.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 2324-Q4 increased from 2146m. to 6278m. The benefits represent additional tax revenue and customer cost savings_x000D_ _x000D_ The baseline benefit update was made through a change request - this was required due to a positive bust on our 5% benefit tolerance level primarily due to a change to the Income Tax Self Assessment (ITSA) additional tax revenue (ATR) methodology (both tax gap targetable by Making Tax Digital (MTD) and revised populations for mandation due to inflationary effects) that generated over 2bn in additional ATR benefits. This has generated a significant positive uplift to the return on investment and benefits cost ratio of both MTD for ITSA and the overall programme.","themes":["Delivery & schedule","Cost & funding","Technical & integration","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The Amber delivery status recognises that the programme continues to navigate a challenging and complex delivery environment. Over the last year, the programme took…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"HMRC_0017_1617-Q2","year":2025,"name":"MAKING TAX DIGITAL","department":"HMRC","category":"ICT","description":"Making Tax Digital is a major transformation programme delivering whole system change to the administration of VAT and Income Tax Self-Assessment (ITSA) tax regimes that will change how millions of customers manage their taxes and interact with HMRC. MTD supports the digitisation and productivity of UK businesses in the 21st century economy. Its aim is to make it easier for businesses to get their tax right and make the calculation and payment of tax simpler through a transformed modern, digital tax service. It will change customer record keeping behaviour by requiring mandated customers to keep digital records and provide quarterly updates to HMRC. This will improve business record keeping and encourage compliant behaviour, whilst providing businesses with a modern digital experience. The MTD programme will drive digital adoption amongst the UK’s small business population to reduce error in tax and financial administration, supporting productivity and growth. It directly supports the government’s priorities to modernise the tax system, improve customer services, and to close the tax gap by raising billions in additional tax revenue to fund public services.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The Amber delivery status recognises that the programme continues to navigate a challenging and complex delivery environment, but remains on track to deliver successfully. Over the last year, the programme made significant progress and remains on track against its critical path plan. The programme completed testing of core functionality and started to ramp up customer volumes in the 24/25 testing period as planned. The public phase of testing will allow further functionality to be used in live with an increasing number and variety of customers ahead of the service going live for mandated customers from April 2026. At Autumn Budget 2024 the government confirmed their commitment to the MTD for ITSA delivery timescales, and at Spring Statement 2025, further announced: •The threshold for MTD for Income Tax will be lowered to £20k from April 2028; •A requirement for MTD customers to complete the entirety of their Self-Assessment obligations in MTD-compatible software; and •A number of deferrals and exemptions for small groups of customers. This announcement provides stakeholders certainty on most of the remaining key policy and design issues, and we will continue to work with stakeholders to address any remaining lower level questions over the coming months.","startDate":"2016-04-01","endDate":"2029-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 has moved to 31/03/2029. This is primarily due to the following factors‚ Compared to the financial year 23/24-Q4, the project's end-date at 24/25-Q4 has been moved to reflect the revised schedule completion date, which is now 31st March 2029. This follows the Business Case update, where MTD programme is now expected to hand over to Business as Usual from March 29, reflecting changes to its scope, including the inclusion of >£20k cohort from 28/29. The programme remains on track to deliver the costed scope as set out in its current business case by March 2029.","fyBaseline":125.94,"fyForecast":126.27,"fyVariance":0.26,"varianceNarrative":"The budget variance is less than or equal to 5%. In year budget variance for 2024-25 is < 0.5%","wholeLifeCost":1439.03,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 1272 to 1439. This is primarily due to the following factors‚ Since Q3 the programme has gained Treasury Approval of our updated business case, which changes our baseline to align with the business case. Departmental Baseline has increased by £166.995m from £1,272.030m to £1,439.025m following the approval of the latest MTD Programme Business Case. This business case now provides an estimate of the programme’s full lifecycle costs, including run costs through to March 2034, which were previously classified as un-costed.","benefits":4270.15,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) decreased from 6278 to 4270. This is primarily due to the following factors‚ Following Treasury Approval of our updated business case our Departmental benefit baseline has reduced by circa £2bn, due to programme scope changes and improved modelling considerations as set out in our programme Business Case v7.0. Modelling assumptions and adjustments take into consideration a major tax gap update that reduced Additional Tax Revenue (ATR), and a review of customer costs incorporated findings from businesses already signed up to MTD and external stakeholders that increased net customer costs. These modelling adjustments are likely to have contributed a significant proportion of the overall reduction in benefits. This programme still represents good value for money.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The Amber delivery status recognises that the programme continues to navigate a challenging and complex delivery environment, but remains on track to deliver…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"HMRC_0017_1617-Q2","year":2026,"name":"MAKING TAX DIGITAL","department":"HMRC","category":"Information and Communications Technology (ICT)","description":"Making Tax Digital is a major transformation programme delivering whole system change to the administration of VAT and Income Tax Self-Assessment (ITSA) tax regimes that will change how millions of customers manage their taxes and interact with HMRC. MTD supports the digitisation and productivity of UK businesses in the 21st century economy. Its aim is to make it easier for businesses to get their tax right and make the calculation and payment of tax simpler through a transformed modern, digital tax service. It will change customer record keeping behaviour by requiring mandated customers to keep digital records and provide quarterly updates to HMRC. This will improve business record keeping and encourage compliant behaviour, whilst providing businesses with a modern digital experience. The MTD programme will drive digital adoption amongst the UK’s small business population to reduce error in tax and financial administration, supporting productivity and growth. It directly supports the government’s priorities to modernise the tax system, improve customer services, and to close the tax gap by raising billions in additional tax revenue to fund public services.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Amber delivery status recognises that the programme continues to navigate a challenging and complex delivery environment but remains on track to deliver successfully with robust risk mitigation plans in place. Over the last year, MTD continued to meet all key delivery and readiness milestones and a successful testing phase has further demonstrated service and operational readiness. A sustained engagement campaign has resulted in strong agent and customer awareness, and customer sign-ups are in line with forecast trajectories required to realise 26/27 benefits. The MTD Programme Board formally reviewed agreed key readiness criteria in September 2025 and January 2026, confirming the programme remained on track to go live from April 2026 with the first mandated cohort. Independent assurance has been secured through an Internal Audit review and the NISTA Gate 0/4 review. Both concluded that the programme is in a strong readiness position, with all key criteria met for go live. ​","startDate":"2016-04-01","endDate":"2029-03-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same. The programme remains on track to deliver the costed scope as set out in its current business case by March 2029.","fyBaseline":138.06,"fyForecast":137.59,"fyVariance":0.34,"varianceNarrative":"The budget variance is less than 5%.","wholeLifeCost":1484.62,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) decreased from £1,439.11m to £1,389.46m. This reflects the current scope of the programme, following some minor in year changes.","benefits":4477.49,"benefitsNarrative":"Overall programme benefits increased by £280m, driven by a combination of policy changes announced at Spring Statement and Autumn Budget 2025 (in particular those relating to Penalty Reform), revised customer costs/saving estimates, and refreshed determinants and population statistics.","themes":["Cost & funding","Governance & assurance","Delivery & schedule","Scope & requirements"],"evidenceExcerpt":"The Amber delivery status recognises that the programme continues to navigate a challenging and complex delivery environment but remains on track to deliver successfully with robust risk mitigation plans in place. Over the last year, MTD continued to meet all key delivery and readiness milestones and a successful testing phase has further demonstrated…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"HMRC_0017_1617-Q2","year":2025,"name":"MAKING TAX DIGITAL","department":"HMRC","category":"ICT","description":"Making Tax Digital is a major transformation programme delivering whole system change to the administration of VAT and Income Tax Self-Assessment (ITSA) tax regimes that will change how millions of customers manage their taxes and interact with HMRC. MTD supports the digitisation and productivity of UK businesses in the 21st century economy. Its aim is to make it easier for businesses to get their tax right and make the calculation and payment of tax simpler through a transformed modern, digital tax service. It will change customer record keeping behaviour by requiring mandated customers to keep digital records and provide quarterly updates to HMRC. This will improve business record keeping and encourage compliant behaviour, whilst providing businesses with a modern digital experience. The MTD programme will drive digital adoption amongst the UK’s small business population to reduce error in tax and financial administration, supporting productivity and growth. It directly supports the government’s priorities to modernise the tax system, improve customer services, and to close the tax gap by raising billions in additional tax revenue to fund public services.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The Amber delivery status recognises that the programme continues to navigate a challenging and complex delivery environment, but remains on track to deliver successfully. Over the last year, the programme made significant progress and remains on track against its critical path plan. The programme completed testing of core functionality and started to ramp up customer volumes in the 24/25 testing period as planned. The public phase of testing will allow further functionality to be used in live with an increasing number and variety of customers ahead of the service going live for mandated customers from April 2026. At Autumn Budget 2024 the government confirmed their commitment to the MTD for ITSA delivery timescales, and at Spring Statement 2025, further announced: •The threshold for MTD for Income Tax will be lowered to £20k from April 2028; •A requirement for MTD customers to complete the entirety of their Self-Assessment obligations in MTD-compatible software; and •A number of deferrals and exemptions for small groups of customers. This announcement provides stakeholders certainty on most of the remaining key policy and design issues, and we will continue to work with stakeholders to address any remaining lower level questions over the coming months.","startDate":"2016-04-01","endDate":"2029-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 has moved to 31/03/2029. This is primarily due to the following factors‚ Compared to the financial year 23/24-Q4, the project's end-date at 24/25-Q4 has been moved to reflect the revised schedule completion date, which is now 31st March 2029. This follows the Business Case update, where MTD programme is now expected to hand over to Business as Usual from March 29, reflecting changes to its scope, including the inclusion of >£20k cohort from 28/29. The programme remains on track to deliver the costed scope as set out in its current business case by March 2029.","fyBaseline":125.94,"fyForecast":126.27,"fyVariance":0.26,"varianceNarrative":"The budget variance is less than or equal to 5%. In year budget variance for 2024-25 is < 0.5%","wholeLifeCost":1439.03,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 1272 to 1439. This is primarily due to the following factors‚ Since Q3 the programme has gained Treasury Approval of our updated business case, which changes our baseline to align with the business case. Departmental Baseline has increased by £166.995m from £1,272.030m to £1,439.025m following the approval of the latest MTD Programme Business Case. This business case now provides an estimate of the programme’s full lifecycle costs, including run costs through to March 2034, which were previously classified as un-costed.","benefits":4270.15,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) decreased from 6278 to 4270. This is primarily due to the following factors‚ Following Treasury Approval of our updated business case our Departmental benefit baseline has reduced by circa £2bn, due to programme scope changes and improved modelling considerations as set out in our programme Business Case v7.0. Modelling assumptions and adjustments take into consideration a major tax gap update that reduced Additional Tax Revenue (ATR), and a review of customer costs incorporated findings from businesses already signed up to MTD and external stakeholders that increased net customer costs. These modelling adjustments are likely to have contributed a significant proportion of the overall reduction in benefits. This programme still represents good value for money.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The Amber delivery status recognises that the programme continues to navigate a challenging and complex delivery environment, but remains on track to deliver…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":0,"attentionScore":18,"attentionReasons":["Current published delivery confidence is Amber"]},{"id":"MOD_0132_2122-Q1","year":2026,"name":"MENSA","department":"MOD","category":"Military Capability","description":"MENSA is the replacement capability for assembly and disassembly of current and future nuclear warheads in support of HMG's strategic deterrent.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 2024/25-Q4, the NISTA/SRO Delivery Confidence Assessment rating at 2025/26-Q4 remained at Amber. This is primarily due to the following factors. 1. Reflects ongoing challenges and a testing supply chain environment, despite positive developments such as improved understanding of the remaining scope and cost to completion, better schedule adherence, and progress towards completing construction prior to commissioning and handover.","startDate":"2011-08-31","endDate":null,"scheduleNarrative":"Exempt under Section 24 - National security","fyBaseline":197.11,"fyForecast":202.25,"fyVariance":2.6,"varianceNarrative":"The budget variance is less than or equal to 5%","wholeLifeCost":3555.91,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 increased from £2929.600 to £2930.500. This is primarily due to the the agreed position presented by AWE at the last Financial Year and the change to a new Financial Year.","benefits":null,"benefitsNarrative":"Compared to financial year 2024/25-Q4, the project's departmental-agreed monetised benefits at 2025/26-Q4 remained at £0m.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 2024/25-Q4, the NISTA/SRO Delivery Confidence Assessment rating at 2025/26-Q4 remained at Amber. This is primarily due to the following factors. 1. Reflects ongoing challenges and a testing supply chain environment, despite positive developments such as improved understanding of the remaining scope and cost to completion, better…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"MOD_0132_2122-Q1","year":2022,"name":"MENSA","department":"MOD","category":"Military Capability","description":"Exempt under Section 24 of the Freedom of Information Act 2000 (National security)","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 24 of the Freedom of Information Act 2000 (National security)","startDate":null,"endDate":null,"scheduleNarrative":"Exempt under Section 24 of the Freedom of Information Act 2000 (National security)","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 24 of the Freedom of Information Act 2000 (National security)","wholeLifeCost":null,"costNarrative":"Exempt under Section 24 of the Freedom of Information Act 2000 (National security)","benefits":null,"benefitsNarrative":"","themes":[],"evidenceExcerpt":"Exempt under Section 24 of the Freedom of Information Act 2000 (National security) Exempt under Section 24 of the Freedom of Information Act 2000 (National security)","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"MOD_0132_2122-Q1","year":2023,"name":"MENSA","department":"MOD","category":"Military Capability","description":"Mensa is the replacement capability for assembly and disassembly of current and future nuclear warheads in support of HMG's strategic deterret.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 is Amber. This is primarily due to the following factors. The project has been challenged to maintain pace whilst managing a complex schedule and a testing supply chain environment. The project continues to make progress and is nearing finishing construction.","startDate":"2011-08-31","endDate":null,"scheduleNarrative":"The schedule narrative was exempt from publication in financial year 21/22-Q4. The project has been challenged to maintain pace whilst managing a complex schedule and a testing supply chain environment. The project continues to make progress and is nearing finishing construction.","fyBaseline":255.66,"fyForecast":255.66,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":2161.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 22/23-Q4 is 2161m. This is primarily due to the following factors. The programme remains affordable and is within its Approved Budgetary Limit of 2,544m. The programme continues delivering at pace, following work to ensure compliance with regulatory safety standards, and the impacts of COVID and other macro-economic pressures on the project's supply chain.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This programme does not report cashable benefits. Its aim is to provision the armed forces with the equipment and / or infrastructure required.","themes":["Delivery & schedule","Cost & funding","Commercial & supply chain","Technical & integration"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 is Amber. This is primarily due to the following factors. The project has been challenged to maintain pace whilst managing a complex schedule and a testing supply chain environment. The project continues to make progress and is nearing finishing construction. The…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"MOD_0132_2122-Q1","year":2024,"name":"MENSA","department":"MOD","category":"Military Capability","description":"MENSA is the replacement capability for assembly and disassembly of current and future nuclear warheads in support of HMG's strategic deterrent.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure and Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The project has been challenged to maintain pace whilst managing a complex schedule and a testing supply chain environment. The project continues to make progress and is nearing finishing construction.","startDate":"2011-08-31","endDate":null,"scheduleNarrative":"The project has been challenged to maintain pace whilst managing a complex schedule and a testing supply chain environment. The project continues to make progress and is nearing the completion of construction.","fyBaseline":268.6,"fyForecast":230.41,"fyVariance":-14.218,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. Completing a commercial reset to address supply chain performance took longer than anticipated due to legal and commercial complexities, with schedule adherence still an issue for the project.","wholeLifeCost":2744.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 increased from 2161m to 2744m. This is primarily due to the following factors. Prolongation associated with the projects complexity and interdependencies between supply chain partners, as well as supply chain performance, capability and capacity. The project remains affordable and within its Whole Life Costs budget.","benefits":0.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 0m.","themes":["Delivery & schedule","Commercial & supply chain","Cost & funding","Technical & integration"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure and Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The project has been challenged to maintain pace whilst managing a complex schedule and a testing supply chain environment. The project continues to make progress…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"MOD_0132_2122-Q1","year":2025,"name":"MENSA","department":"MoD","category":"Military Capability","description":"MENSA is the replacement capability for assembly and disassembly of current and future nuclear warheads in support of the UK's strategic deterrent.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. The programme continuing to improve its understanding of the remaining scope and cost to completion, improvement of schedule adherence and progress towards finishing construction before commissioning and handover.","startDate":"2011-08-31","endDate":null,"scheduleNarrative":"Section 24 - National security","fyBaseline":219.7,"fyForecast":219.7,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":2929.6,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 2744 to 2929. This is primarily due to the following factors. An uplift in budget to £2929.6M has been approved to enable the project to continue delivering in the face of increasing material and labour costs.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits","themes":["Cost & funding","Delivery & schedule","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. The programme continuing to improve its understanding of the remaining scope and cost to completion, improvement of schedule adherence and progress towards finishing construction before commissioning…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"MOD_0132_2122-Q1","year":2026,"name":"MENSA","department":"MOD","category":"Military Capability","description":"MENSA is the replacement capability for assembly and disassembly of current and future nuclear warheads in support of HMG's strategic deterrent.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 2024/25-Q4, the NISTA/SRO Delivery Confidence Assessment rating at 2025/26-Q4 remained at Amber. This is primarily due to the following factors. 1. Reflects ongoing challenges and a testing supply chain environment, despite positive developments such as improved understanding of the remaining scope and cost to completion, better schedule adherence, and progress towards completing construction prior to commissioning and handover.","startDate":"2011-08-31","endDate":null,"scheduleNarrative":"Exempt under Section 24 - National security","fyBaseline":197.11,"fyForecast":202.25,"fyVariance":2.6,"varianceNarrative":"The budget variance is less than or equal to 5%","wholeLifeCost":3555.91,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 increased from £2929.600 to £2930.500. This is primarily due to the the agreed position presented by AWE at the last Financial Year and the change to a new Financial Year.","benefits":null,"benefitsNarrative":"Compared to financial year 2024/25-Q4, the project's departmental-agreed monetised benefits at 2025/26-Q4 remained at £0m.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 2024/25-Q4, the NISTA/SRO Delivery Confidence Assessment rating at 2025/26-Q4 remained at Amber. This is primarily due to the following factors. 1. Reflects ongoing challenges and a testing supply chain environment, despite positive developments such as improved understanding of the remaining scope and cost to completion, better…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"MOD_0132_2122-Q1","year":2025,"name":"MENSA","department":"MoD","category":"Military Capability","description":"MENSA is the replacement capability for assembly and disassembly of current and future nuclear warheads in support of the UK's strategic deterrent.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. The programme continuing to improve its understanding of the remaining scope and cost to completion, improvement of schedule adherence and progress towards finishing construction before commissioning and handover.","startDate":"2011-08-31","endDate":null,"scheduleNarrative":"Section 24 - National security","fyBaseline":219.7,"fyForecast":219.7,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":2929.6,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 2744 to 2929. This is primarily due to the following factors. An uplift in budget to £2929.6M has been approved to enable the project to continue delivering in the face of increasing material and labour costs.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits","themes":["Cost & funding","Delivery & schedule","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. The programme continuing to improve its understanding of the remaining scope and cost to completion, improvement of schedule adherence and progress towards finishing construction before commissioning…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":null,"attentionScore":18,"attentionReasons":["Current published delivery confidence is Amber"]},{"id":"DFT_0043_2021-Q2","year":2026,"name":"MIDLANDS RAIL HUB","department":"DFT","category":"Infrastructure and Construction","description":"The Midlands Rail Hub programme will improve connectivity between South Wales, the South-west of England, the West and East Midlands, by delivering additional rail capacity into central Birmingham, to promote growth in the regional Midlands economies. At its heart are two new chords at Bordesley which enable new connections into Moor Street and relieve the congested New Street. The programme will be progressed in multiple phases, with the first (the West and Central scope, for improved services between Birmingham, to the South West, Cardiff, and Worcester) currently in detailed design, and later phases (between the West and East Midlands and extending Worcester services to Hereford) in earlier stages of development.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24-25-Q4, the NISTA Delivery Confidence Assessment rating at 25/26-Q4 remained at AMBER. This is due to the following factors: the confirmation by the Chancellor of funding to progress the next stage of Midlands Rail Hub at the 2025 Spending Review, and Network Rail’s recent appointment and mobilisation of the Alliance contractor who will design and build the Western scope, represent a significant step forward for the programme. However, we continue to manage a number of significant risks, including affordability of operational expenditure and rolling stock choices, as well as new potential risks associated with the proposed transfer of MRH sponsorship from DfT into Network Rail. We are also continuing to examine the value for money and affordability of accelerating delivery and progressing the Eastern and Hereford scope.","startDate":"2017-04-01","endDate":"2040-12-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained at 31/12/2040. This is primarily due to the following factors‚ The West Scope is on-track to be in service in the early 2030s. Development of later phases of the scheme, to the East Midlands and between Worcester and Hereford, is continuing and will be used to inform future investment decisions.","fyBaseline":6.7,"fyForecast":6.7,"fyVariance":0.0,"varianceNarrative":"The budget variance is within 5% for this financial year.","wholeLifeCost":948.37,"costNarrative":"Compared to financial year 24/25 the project’s departmental agreed Whole Life Cost from FY 24/25-Q4 (measured in £m) has not changed at 1569. The Whole Life Costs for the Programme are being reviewed as part of an updated business case for the whole programme.","benefits":1938.6,"benefitsNarrative":"Compared to financial year 24/25 the project’s departmental agreed Benefits from FY 24/25-Q4 (measured in £m) has not changed at 1817. The Benefits for the Programme are being reviewed as part of an updated business case for the whole programme.","themes":["Cost & funding","Scope & requirements","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 24-25-Q4, the NISTA Delivery Confidence Assessment rating at 25/26-Q4 remained at AMBER. This is due to the following factors: the confirmation by the Chancellor of funding to progress the next stage of Midlands Rail Hub at the 2025 Spending Review, and Network Rail’s recent appointment and mobilisation of the Alliance contractor…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"DFT_0043_2021-Q2","year":2021,"name":"Midlands Rail Hub","department":"DFT","category":"Infrastructure and Construction","description":"Midlands Rail Hub has three strategic aims: to support the growth of the Midlands economy through better connections between the economic centres of Birmingham, Leicester and Nottingham. To make the most of the opportunities of the Integrated Rail Plan/HS2 and allow up to 10 additional trains (in each direction) to serve Central Birmingham. Up to 20 proposal are being examined across the region, but the centre piece of the scheme are two chords (connecting the Camp Hill Line to the Snow Hill Line) at Bordesley in Central Birmingham. This would allow trains that currently serve New Street to be diverted to Moor Street and Snow Hill stations, providing new journey opportunities and a convenient interchange with HS2's Curzon Street Station (via Moor Street). The scheme was a 2019 manifesto commitment and remains a key priority. Several elements of the Western Corridor (including Kings Norton - Barnt Green and Snow Hill Platform 4) are \"Project Speed\" candidates for acceleration and early delivery.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber.This is primarily due to the following factors: The project team are currently considering the impact of the Integrated Rail Plan on the Eastern Corridor. This is likely to result in a changes to the scope to if there are changes to HS2 routing and station options in the East Midlands. Consequently, the Outline Business Case is being developed in two parts so as to not slow down development of the South Western Corridor. A land acquisition strategy is being formulated, and proposal for possible early acquisition of land and being drawn up.","startDate":"2017-04-01","endDate":"2033-06-30","scheduleNarrative":"The project end-date is 30 June 2033. This is primarily due to the following factors: We are seeking to better the delivery date of the Outline Business Case (OBC) from the current forecast. Because of uncertainty around the Eastern Corridor as a result of Integrated Rail Plan, development work has been prioritised on the South West Corridor and we are expecting delivery of the South West Corridor OBC in Q4 2022. The East Corridor OBC will follow in Q1 2023. We are seeking to improve even the revised delivery dates. Two elements of the scheme, platform 4 at Snow Hill Station and Kings Norton interventions, are being accelerated as part of Project Speed and we expect Network Rail to complete OBCs for these schemes before the end of 2022. Further acceleration from even these dates is being considered.","fyBaseline":5.82,"fyForecast":1.39,"fyVariance":-76.0,"varianceNarrative":"The budget variance exceeds 5%. Project spend is within 1% of the forecast in the revised budget that was change controlled following the delayed start to the project. This was due to an unexpected elongation of the governance process, and challenges regarding Network Rail's internal procurement processes, which has necessitated an external tender for third-party technical advisors to deliver the works.","wholeLifeCost":1562.54,"costNarrative":"The projects Baseline Whole Life Cost is �1562.54m. This is primarily due to the following factors: The whole life cost is based on the capital costs of delivery of up to 20 interventions across the Midlands, and includes two major infrastructure interventions in central Birmingham. They require land acquisition and pose considerable civil engineering and construction challenges. The Bordesley East and West Chords make up approximately 50% of the total Anticipated Final Cost (AFC) depending on whether Bordesley viaduct needs to be widened. As the scheme is in the initial stages of Outline Business Case development, there is still considerable uncertainty as to the AFC, which is why it is expressed as a range with a considerable risk allowance. Furthermore, it should be noted that it is likely to be delivered in phases over several control periods.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber.This is primarily due to the following factors: The project team are currently considering the impact of the Integrated Rail Plan on the Eastern Corridor. This is likely to result in a changes to the scope to if there are changes to HS2 routing and station options in the…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21"},{"id":"DFT_0043_2021-Q2","year":2022,"name":"Midlands Rail Hub","department":"DFT","category":"Infrastructure and Construction","description":"Following publication of the Integrated Rail Plan, Midlands Rail Hub will focus on bringing additional services into Central Birmingham from the south west. This will allow more people to benefit from HS2 by providing a convenient interchange the new station at Curzon Street, improved local services in Birmingham and provide capacity for additional Bristol and Cardiff trains.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 remained at Amber. We remain confident that the Outline Business Case for the programme will be delivered in October 2022. In the next quarter the programme scope will be aligned with the Integrated Rail Plan but will retain the ability to deliver the eastern elements of the scheme if funding is available.","startDate":"2017-04-01","endDate":"2033-06-30","scheduleNarrative":"Compared to 2021-Q4, your project end-date remained scheduled to finish on 30 JUN 2033 . This is primarily due to the following factors: The OBC for the programme will be delivered in October 2022. There is no reason to suggest that the entire programme cannot be delivered by June 2033.","fyBaseline":9.26,"fyForecast":1.43,"fyVariance":-89.0,"varianceNarrative":"While the yearly spend varies from the original baseline, the actual spend is in line with the current programme (set out in the change control from October 2021). Project spend for the OBC is in line with current forecasts and it is expected that the project will utilise all allocated funding.","wholeLifeCost":1563.0,"costNarrative":"Compared to2021-Q4, the projects Baseline Whole Life Cost increased from 1562.54 (£m) to 1562.55 (£m). This is primarily due to the following factors: Whole life costs are in line with programme forecasts. This will be updated as part of the OBC.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Scope & requirements","Approvals & decisions","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 remained at Amber. We remain confident that the Outline Business Case for the programme will be delivered in October 2022. In the next quarter the programme scope will be aligned with the Integrated Rail Plan but will retain the…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"DFT_0043_2021-Q2","year":2023,"name":"Midlands Rail Hub","department":"DFT","category":"Infrastructure and Construction","description":"The Outline Business Case for Midlands Rail Hubs West and Central scope was received in November 2022, and it is progressing through assurance and governance to support a Decision to Design. Following the IPAs review in February 2023, we are working with Network Rail and Midlands Connect to ensure full separability of the programmes scope.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. Midlands Rail Hub was subject to an IPA Gate 0 review in February 2023, and received an Amber rating. The review recommended clarifying the Departments objectives for investment, scope separability, resources, and governance. The project team is addressing the recommendations, and we intend to present the Decision to Design to the Investment Portfolio and Delivery Committee in June.","startDate":"2017-04-01","endDate":"2033-06-30","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2033-06-30. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2033-06-30. This is primarily due to the following factors. The November 2022 OBC forecasts entry into service of Midlands Rail Hub in December 2030. While this may change during further development of the scheme, there is no reason at present why this cant be achieved.","fyBaseline":7.31,"fyForecast":3.35,"fyVariance":-54.0,"varianceNarrative":"The project is currently well within budget and there is no obvious reason why this will be exceeded.","wholeLifeCost":1563.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 remained at 1563m. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 remained at 1563m. This is primarily due to the following factors.","benefits":1817.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 1817m.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. Midlands Rail Hub was subject to an IPA Gate 0 review in February 2023, and received an Amber rating. The review recommended clarifying the Departments objectives for…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"DFT_0043_2021-Q2","year":2024,"name":"Midlands Rail Hub","department":"DFT","category":"Infrastructure and Construction","description":"The Midlands Rail Hub programme will improve connectivity between South Wales, the South-west of England, the West and East Midlands, by delivering additional rail capacity into central Birmingham, to promote growth in the regional Midlands economies. At its heart is the provision of new connections into Moor Street station and relieving the congested New Street station. The programme will be progressed in multiple phases, with the first (the West and Central scope, for improved services between Birmingham, Bristol, Cardiff, and Worcester) currently in detailed design, and later phases (between the West and East Midlands, and extending Worcester services to Hereford) in earlier stages of development.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The design of the West to Worcester, and Central, scope has now been remitted to Network Rail, who are well advanced in procuring a contractor for the detailed design work. We are working towards a programme-wide OBC which will further develop the proposals for the rest of the programme, including improvements between the East and West Midlands, and between Worcester and Hereford.","startDate":"2017-04-01","endDate":"2040-12-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 increased from 2033-06-30 to 2040-12-31. This is primarily due to the following factors. The West to Worcester, and Central, scope remains on track and could be complete by the early 2030s, while other scope is at an earlier stage of development and subject to future decisions.","fyBaseline":7.3,"fyForecast":7.31,"fyVariance":0.0,"varianceNarrative":"The budget variance is inferior or equal to 5%.","wholeLifeCost":1569.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 increased from 1563m. to 1569m. This is primarily due to the following factors. The Whole Life Costs will be reviewed as part of the programme-wide OBC.","benefits":1817.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 1817m.","themes":["Cost & funding","Scope & requirements","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The design of the West to Worcester, and Central, scope has now been remitted to Network Rail, who are well advanced in procuring a contractor for the detailed design…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"DFT_0043_2021-Q2","year":2025,"name":"MIDLANDS RAIL HUB","department":"DfT","category":"Infrastructure and Construction","description":"The Midlands Rail Hub programme will improve connectivity between South Wales, the South-west of England, the West and East Midlands, by delivering additional rail capacity into central Birmingham, to promote growth in the regional Midlands economies. At its heart are two new chords at Bordesley which enable new connections into Moor Street and relieve the congested New Street. The programme will be progressed in multiple phases, with the first (the West and Central scope, for improved services between Birmingham, Bristol, Cardiff, and Worcester) currently in detailed design, and later phases (between the West and East Midlands, and extending Worcester services to Hereford) in earlier stages of development.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Prior to the conclusion of the Spending Review, uncertainty about available funding and Government support for the West scope led to the procurement of a design and delivery contractor being paused. We are working with Network Rail to minimise the impacts of any delay to delivery. A programme-wide Outline Business Case, which strengthens the strategic and economic rationale for the scheme, is well advanced and will be used to inform future decisions about the Eastern scope.","startDate":"2017-04-01","endDate":"2040-12-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/12/2040. This is primarily due to the following factors‚ The West Scope is on-track to be in service in the early 2030s. Development of later phases of the scheme, to the East Midlands and between Worcester and Hereford, is continuing and will be used to inform future investment decisions.","fyBaseline":5.13,"fyForecast":4.65,"fyVariance":9.36,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ Early development work was replanned to accommodate in-year 2024/25 funding pressures following the first phase of the Spending Review.","wholeLifeCost":1569.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 1569. This is primarily due to the following factors‚ There was no change in the expected costs of the Programme in 2024/25.","benefits":1817.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 1817. This is primarily due to the following factors‚ There was no change to the expected benefits of the Programme in 2024/25.","themes":["Cost & funding","Delivery & schedule","Scope & requirements","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Prior to the conclusion of the Spending Review, uncertainty about available funding and Government support for the West scope led to the procurement of a design and…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"DFT_0043_2021-Q2","year":2026,"name":"MIDLANDS RAIL HUB","department":"DFT","category":"Infrastructure and Construction","description":"The Midlands Rail Hub programme will improve connectivity between South Wales, the South-west of England, the West and East Midlands, by delivering additional rail capacity into central Birmingham, to promote growth in the regional Midlands economies. At its heart are two new chords at Bordesley which enable new connections into Moor Street and relieve the congested New Street. The programme will be progressed in multiple phases, with the first (the West and Central scope, for improved services between Birmingham, to the South West, Cardiff, and Worcester) currently in detailed design, and later phases (between the West and East Midlands and extending Worcester services to Hereford) in earlier stages of development.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24-25-Q4, the NISTA Delivery Confidence Assessment rating at 25/26-Q4 remained at AMBER. This is due to the following factors: the confirmation by the Chancellor of funding to progress the next stage of Midlands Rail Hub at the 2025 Spending Review, and Network Rail’s recent appointment and mobilisation of the Alliance contractor who will design and build the Western scope, represent a significant step forward for the programme. However, we continue to manage a number of significant risks, including affordability of operational expenditure and rolling stock choices, as well as new potential risks associated with the proposed transfer of MRH sponsorship from DfT into Network Rail. We are also continuing to examine the value for money and affordability of accelerating delivery and progressing the Eastern and Hereford scope.","startDate":"2017-04-01","endDate":"2040-12-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained at 31/12/2040. This is primarily due to the following factors‚ The West Scope is on-track to be in service in the early 2030s. Development of later phases of the scheme, to the East Midlands and between Worcester and Hereford, is continuing and will be used to inform future investment decisions.","fyBaseline":6.7,"fyForecast":6.7,"fyVariance":0.0,"varianceNarrative":"The budget variance is within 5% for this financial year.","wholeLifeCost":948.37,"costNarrative":"Compared to financial year 24/25 the project’s departmental agreed Whole Life Cost from FY 24/25-Q4 (measured in £m) has not changed at 1569. The Whole Life Costs for the Programme are being reviewed as part of an updated business case for the whole programme.","benefits":1938.6,"benefitsNarrative":"Compared to financial year 24/25 the project’s departmental agreed Benefits from FY 24/25-Q4 (measured in £m) has not changed at 1817. The Benefits for the Programme are being reviewed as part of an updated business case for the whole programme.","themes":["Cost & funding","Scope & requirements","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 24-25-Q4, the NISTA Delivery Confidence Assessment rating at 25/26-Q4 remained at AMBER. This is due to the following factors: the confirmation by the Chancellor of funding to progress the next stage of Midlands Rail Hub at the 2025 Spending Review, and Network Rail’s recent appointment and mobilisation of the Alliance contractor…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"DFT_0043_2021-Q2","year":2025,"name":"MIDLANDS RAIL HUB","department":"DfT","category":"Infrastructure and Construction","description":"The Midlands Rail Hub programme will improve connectivity between South Wales, the South-west of England, the West and East Midlands, by delivering additional rail capacity into central Birmingham, to promote growth in the regional Midlands economies. At its heart are two new chords at Bordesley which enable new connections into Moor Street and relieve the congested New Street. The programme will be progressed in multiple phases, with the first (the West and Central scope, for improved services between Birmingham, Bristol, Cardiff, and Worcester) currently in detailed design, and later phases (between the West and East Midlands, and extending Worcester services to Hereford) in earlier stages of development.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Prior to the conclusion of the Spending Review, uncertainty about available funding and Government support for the West scope led to the procurement of a design and delivery contractor being paused. We are working with Network Rail to minimise the impacts of any delay to delivery. A programme-wide Outline Business Case, which strengthens the strategic and economic rationale for the scheme, is well advanced and will be used to inform future decisions about the Eastern scope.","startDate":"2017-04-01","endDate":"2040-12-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/12/2040. This is primarily due to the following factors‚ The West Scope is on-track to be in service in the early 2030s. Development of later phases of the scheme, to the East Midlands and between Worcester and Hereford, is continuing and will be used to inform future investment decisions.","fyBaseline":5.13,"fyForecast":4.65,"fyVariance":9.36,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ Early development work was replanned to accommodate in-year 2024/25 funding pressures following the first phase of the Spending Review.","wholeLifeCost":1569.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 1569. This is primarily due to the following factors‚ There was no change in the expected costs of the Programme in 2024/25.","benefits":1817.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 1817. This is primarily due to the following factors‚ There was no change to the expected benefits of the Programme in 2024/25.","themes":["Cost & funding","Delivery & schedule","Scope & requirements","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Prior to the conclusion of the Spending Review, uncertainty about available funding and Government support for the West scope led to the procurement of a design and…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":0,"attentionScore":18,"attentionReasons":["Current published delivery confidence is Amber"]},{"id":"DEFRA_0013_2021-Q4","year":2026,"name":"NATURE FOR CLIMATE FUND","department":"DEFRA","category":"Infrastructure and Construction","description":"To support the government’s ambitions for net zero and environmental improvement, Defra established the five-year Nature for Climate Fund Programme to increase tree planting and restore peatland in England. Between 2024‑25, the Programme directly planted 7,162 hectares of tree planting (95% of the annual target). Up to 2024-25 the programme directly funded 23,526 hectares of peatland restoration (67% of the annual target), contributing to total national delivery of 21,186 hectares of tree planting and 26,426 hectares of peatland restoration over the period. The Programme was extended into 2025‑26, with peatland grants extended to 2026‑27, while Defra considers future delivery and funding arrangements. The new Trees Programme (non GMPP) is expected to reach completion in 2030.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 2024‑25 Q4, the SRO Delivery Confidence Assessment (DCA) rating at 2025‑26 Q4 decreased to Amber. This reflects a combination of near‑term delivery pressures and pipeline risks, despite strong historical performance and a positive long‑term outlook. Official statistics for 2024‑25 showed a significant year‑on‑year increase in tree planting, with 7,164 hectares delivered in England, the highest annual rate in over 20 years, demonstrating the Programme’s ability to scale delivery. Delivery confidence for 2025‑26 has reduced due to a contraction in the tree planting pipeline since Q3, driven by lower expected output from England Woodland Creation Offer and the Community Forests and weather‑related impacts earlier in the season. Uncertainty over funding going into the final year of delivery will also have impacted the tree planting pipeline This has resulted in forecast delivery of around ~6000ha for the year. Mitigations are in place, including strengthened resourcing, organisational restructuring and the transition to the successor Trees Programme, supported by an approved business case. The rating reflects short‑term uncertainty while longer‑term delivery confidence remains strong, underpinned by improved capability, new funding mechanisms and a clear delivery pathway.","startDate":"2020-04-01","endDate":null,"scheduleNarrative":"Compared to financial year 2024‑25 Q4, the project’s end‑date at 2025‑26 Q4 remained the same, following a one‑year extension that was agreed to enable the design and mobilisation of the successor Trees Programme. The extension provided additional time to put in place future delivery arrangements and secure the necessary approvals, while maintaining continuity of activity. The programme closed at the end of March 2026, with key transition milestones on track and no further changes to the end‑date anticipated.","fyBaseline":255.2,"fyForecast":255.2,"fyVariance":0.0,"varianceNarrative":"The budget variance exceeds 5% by a small margin. This is primarily due to the following factors. The overall NCF Programme for 2025/26 is currently forecasting an underspend of £11.45m, representing a 5.55% variance against the agreed Financial Year baseline (inclusive of a £5.9m Defra underspend). This position remains indicative and subject to minor change as final outturn information is confirmed with ALB delivery partners and wider Defra teams. The majority of the variance relates to CDEL, which is forecast to underspend by £11.23m (6.36% under budget). This reflects slower-than-anticipated delivery across parts of the capital Programme during the year. RDEL performance remained broadly on track. Administration expenditure is forecast to be 0.89% under budget, while Programme expenditure is forecast to underspend by £0.22m (0.74%).","wholeLifeCost":1272.06,"costNarrative":"Compared to financial year 24/25‑Q4, the project’s departmentally agreed Whole Life Cost at 25/26‑Q4 increased to £176.52m CDEL and £29.88m RDEL. This increase is due to an agreed extension to the Programme to allow for the development and transition to a successor Programme. The increase in Whole Life Costs reflects the extended duration of the Programme rather than any change in scope or increase in cost per unit, with underlying delivery costs and assumptions remaining unchanged.","benefits":30171.62,"benefitsNarrative":"Compared to financial year 24/25‑Q4, the project’s departmentally agreed Benefits at 25/26‑Q4 remained unchanged. This is because the agreed outcomes, scope, and benefits methodology have not changed following the Programme extension, which was agreed to allow for the development of a successor Programme. The extension impacts the duration of delivery rather than the nature or scale of benefits, and no new evidence or methodological changes have been introduced that would materially affect the benefits valuation.","themes":["Cost & funding","Delivery & schedule","Scope & requirements","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 2024‑25 Q4, the SRO Delivery Confidence Assessment (DCA) rating at 2025‑26 Q4 decreased to Amber. This reflects a combination of near‑term delivery pressures and pipeline risks, despite strong historical performance and a positive long‑term outlook. Official statistics for 2024‑25 showed a significant year‑on‑year increase in tree…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"DEFRA_0013_2021-Q4","year":2021,"name":"Nature for Climate Fund","department":"DEFRA","category":"Infrastructure and Construction","description":"The Nature for Climate Fund Programme has been established to significantly increase tree planting, woodland creation and management, and peatland restoration, in England to support the delivery of Net Zero and 25-Year Environment Plan commitments. The programme is also designed to deliver wider social, economic and environmental benefits.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber/red.This is primarily due to the following factors: The Nature for Climate Fund was established in 2020/21. Significant progress has been made to establish the programme in 2020/21 and to start delivery against the programme's ambitious objectives. The programme has accepted all recommendations that were made by the IPA following reviews in the second half of 2020 and made significant progress in addressing these recommendations. This has included ensuring that the programme has the correct resources, capabilities and governance in place to support effective delivery.","startDate":"2020-04-01","endDate":"2025-03-31","scheduleNarrative":"The project end-date is 31 March 2025. This is primarily due to the following factors: The schedule of the programme positions the Nature for Climate Fund programme well for delivery against its ambitious targets. Delivery has already successfully begun in 2020/21 (year 1 of the programme) and 2020/21 has also seen significant work to establish programme structures that will support successful delivery in years 2-5, with significant ramping up of delivery from year 2 onwards.","fyBaseline":52.72,"fyForecast":52.72,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":756.36,"costNarrative":"The projects Baseline Whole Life Cost is �756.36m. This is primarily due to the following factors: �640M of expected capital funding for the Nature for Climate Fund was announced as part of the Budget in March 2020. Only the 2021-22 financial year was scored at the 2020 Spending Review meaning future years funding is subject to approval through subsequent Spending Reviews.","benefits":null,"benefitsNarrative":"","themes":["Delivery & schedule","Cost & funding","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber/red.This is primarily due to the following factors: The Nature for Climate Fund was established in 2020/21. Significant progress has been made to establish the programme in 2020/21 and to start delivery against the programme's ambitious objectives. The programme has…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21"},{"id":"DEFRA_0013_2021-Q4","year":2022,"name":"Nature for Climate Fund","department":"DEFRA","category":"Infrastructure and Construction","description":"The Nature for Climate Fund Programme has been established to significantly increase tree planting, woodland creation and management, and peatland restoration, in England to support the delivery of Net Zero and 25-Year Environment Plan commitments. The programme is also designed to deliver wider social, economic and environmental benefits.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 decreased from Amber/red to Amber Significant progress has been made to establish the programme and to begin delivery against the programme's ambitious objectives. The programme has accepted all recommendations that were made by the IPA following reviews in 2020 and 2021 and has made significant progress in addressing these recommendations. This has included ensuring that the programme has the correct resources, capabilities and governance in place to support effective delivery.","startDate":"2020-04-01","endDate":"2025-03-31","scheduleNarrative":"Compared to 2021-Q4, your project end-date remained scheduled to finish on 31 MAR 2025 . This is primarily due to the following factors: The schedule of the programme positions the Nature for Climate Fund programme well for delivery against its ambitious targets. The NCF Tree Programme is now well into delivery phase, with?a range of initiatives delivering tree planting but there has also been significant work to establish programme structures that will support successful delivery in years 3-5.","fyBaseline":108.65,"fyForecast":108.65,"fyVariance":0.0,"varianceNarrative":"The budget variance is inferior or equal to 5%.","wholeLifeCost":763.0,"costNarrative":"Compared to2021-Q4, the projects Baseline Whole Life Cost increased from 756.36 (£m) to 762.62 (£m). This is primarily due to the following factors: The slight increase in Whole Life Costs is due to the need for additional RDEL in some projects. This has been baselined in our most recent Business Case.","benefits":null,"benefitsNarrative":"","themes":["Delivery & schedule","Cost & funding","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 decreased from Amber/red to Amber Significant progress has been made to establish the programme and to begin delivery against the programme's ambitious objectives. The programme has accepted all recommendations that were made by the…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"DEFRA_0013_2021-Q4","year":2023,"name":"Nature for Climate Fund","department":"DEFRA","category":"Infrastructure and Construction","description":"The Nature for Climate Fund Programme has been established to significantly increase tree planting, woodland creation and management, and peatland restoration in England to support the delivery of Net Zero and 25-Year Environment Plan commitments. The programme is also designed to deliver wider social, economic and environmental benefits.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 decreased from Amber to Red. This is primarily due to the following factors. We have implemented many of the recommendations made by the IPA in 2022, and continue to welcome their support and assurance to improve delivery confidence. We have continued programme activity at pace, having sought greater clarity over the future of woodland creation and recalibrated planned activity through the programme's annual review process.","startDate":"2020-04-01","endDate":"2025-03-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2025-03-31. This is primarily due to the following factors. The NCF Programme is now well into its delivery phase, witha range of initiatives scheduled to deliver tree planting and peatland restoration. The programme's trajectories are showing an upward trend through the remaining years of the programme, but there are several key enablers required to match the planned delivery trajectory, which steepens over that period, and these are not certain. These key enablers include landowner demand for the schemes put forward through the NCF and the ability of the wider sector to respond to that demand. There has been a significant effort to implement these enablers and improve delivery confidence for years 4-5, and for woodland creation and peatland restoration beyond NCF.","fyBaseline":219.26,"fyForecast":219.26,"fyVariance":0.0,"varianceNarrative":"The budget variance is inferior or equal to 5%.","wholeLifeCost":928.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 increased from 763m. to 928m. This is primarily due to the following factors. The increase in Whole Life Cost is due to an increase in the overall Programme budget and scope which was approved through an updated business case in 2022.","benefits":54302.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 54302m. The project's departmental-agree monetised benefits at 22/23-Q4 is 54302m.The project's departmental-agree monetised benefits at 22/23-Q4 is 54302m.The project's departmental-agree monetised benefits at 22/23-Q4 is 54302m. The total monetized benefits figure is based on the cumulative benefits arising from tree planting and peatland restoration over the course of the NCF programme. Measured over a 50-year appraisal period, these benefits include: carbon sequestration, biodiversity, recreation, flood regulation, air quality and landscape.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 decreased from Amber to Red. This is primarily due to the following factors. We have implemented many of the recommendations made by the IPA in 2022, and continue to welcome their support and assurance to improve delivery confidence.…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"DEFRA_0013_2021-Q4","year":2024,"name":"Nature for Climate Fund","department":"DEFRA","category":"Infrastructure and Construction","description":"The Nature for Climate Fund Programme has been established to significantly increase tree planting, woodland creation and management, and peatland restoration in England to support the delivery of Net Zero and 25-Year Environment Plan commitments. The programme is also designed to deliver wider social, economic and environmental benefits.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Red. This is primarily due to the following factors. The Nature for Climate Fund is increasing tree planting rates year on year, with 22/23 planting rates the highest in nearly a decade. Our work to transform the forestry sector is also starting to take effect. The Nature for Climate Peatland Grant is delivering increasing hectares of peatland restoration in England each year. Successive IPA reviews confirm that the Programme structure is broadly fit-for-purpose, with several notable strengths. However, whilst technically possible, reaching our tree planting and peatland restoration targets remains extremely challenging. Several external factors are delaying the progress of projects, including weather, sector capacity constraints, future funding uncertainty and the availability of private finance. Given this challenge, the delivery confidence for the Nature for Climate Fund is currently Red. Plans are in place to maximise delivery in Year 5 of the programme and prepare for the next phase of work. We continue to welcome support from the IPA.","startDate":"2020-04-01","endDate":"2025-03-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2025-03-31. This is primarily due to the following factors. The NCF Programme is now well into its delivery phase, with a range of initiatives scheduled to deliver tree planting and peatland restoration. The programme's trajectories are showing an upward trend through the remaining years of the programme, but there are several key enablers required to match the planned delivery trajectory, which steepens over that period, and these are not certain. These key enablers include landowner demand for the schemes put forward through the NCF and the ability of the wider sector to respond to that demand. There has been a significant effort to implement these enablers and improve delivery confidence for years 4-5, and for woodland creation and peatland restoration beyond NCF.","fyBaseline":265.11,"fyForecast":265.11,"fyVariance":0.0,"varianceNarrative":"The budget variance is inferior or equal to 5%.","wholeLifeCost":928.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 remained at 928m. This is primarily due to the following factors. The overall Programme budget and scope was approved through an updated business case in 2022.","benefits":48468.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 2324-Q4 decreased from 54302m. to 48468m. The total monetized benefits figure is based on the cumulative benefits arising from tree planting and peatland restoration over the course of the NCF programme. Measured over a 50-year appraisal period, these benefits include: carbon sequestration, biodiversity, recreation, flood regulation, air quality and landscape.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Red. This is primarily due to the following factors. The Nature for Climate Fund is increasing tree planting rates year on year, with 22/23 planting rates the highest in nearly a decade. Our work to transform the forestry…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"DEFRA_0013_2021-Q4","year":2025,"name":"NATURE FOR CLIMATE FUND","department":"DEFRA","category":"Infrastructure and Construction","description":"The Nature for Climate Fund Programme has been established to significantly increase tree planting, woodland creation and management, and peatland restoration in England to support the delivery of Net Zero and 25-Year Environment Plan commitments. The programme is also designed to deliver wider social, economic and environmental benefits.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remains Red. This is primarily due to the following factors‚ The data for the programme is taken up to the 31st of March 2025, and therefore is reflective of the financial uncertainty experienced by the programme in Q4, and difficult weather conditions during planting season. This prevented some planting occurring within the 24/25 financial year, so the programme was unable to deliver the full level of planting or peat restoration needed to meet the required trajectory towards the 2050 statutory target. However, as the programme receives data retrospectively after the end of the financial year, there is now more confidence in 24/25 delivery. The programme is predicted to deliver the highest year of annual planting since the inception of the Nature for Climate Fund, and the last 20 years. Furthermore, the programme's enabling projects have also significantly contributed to the transformation of the forestry sector for example by increasing sector capacity through grants and apprenticeships. The SRO assessment is Amber based on the data that became available in April 2025, and we anticipate subsequent ratings will be Amber when the data is available to all parties.","startDate":"2020-04-01","endDate":null,"scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2025 to 27/06/2025. This is primarily due to the following factors‚ The Nature for Climate Fund programme end date has been provisionally extended to the 31st of March 2026, subject to a review in June 2025, through an extension of the existing programme business case. This allowed the programme to maintain momentum using mature delivery mechanisms for the duration of the 2025/26 financial year whilst further work is carried out to design future tree planting activities.","fyBaseline":287.36,"fyForecast":287.36,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%. The budget variance is less than or equal to 5%.","wholeLifeCost":928.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 928. This is primarily due to the following factors‚ The overall Programme budget and scope was approved through an updated business case in 2022.","benefits":48468.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 48468. This is primarily due to the following factors‚ The total monetised benefits figure is based on the cumulative benefits arising from tree planting and peatland restoration over the course of the NCF programme. Measured over a 50-year appraisal period, these benefits include: carbon sequestration, biodiversity, recreation, flood regulation, air quality and landscape.","themes":["Cost & funding","Technical & integration","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remains Red. This is primarily due to the following factors‚ The data for the programme is taken up to the 31st of March 2025, and therefore is reflective of the financial uncertainty experienced by the programme in Q4, and difficult…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"DEFRA_0013_2021-Q4","year":2026,"name":"NATURE FOR CLIMATE FUND","department":"DEFRA","category":"Infrastructure and Construction","description":"To support the government’s ambitions for net zero and environmental improvement, Defra established the five-year Nature for Climate Fund Programme to increase tree planting and restore peatland in England. Between 2024‑25, the Programme directly planted 7,162 hectares of tree planting (95% of the annual target). Up to 2024-25 the programme directly funded 23,526 hectares of peatland restoration (67% of the annual target), contributing to total national delivery of 21,186 hectares of tree planting and 26,426 hectares of peatland restoration over the period. The Programme was extended into 2025‑26, with peatland grants extended to 2026‑27, while Defra considers future delivery and funding arrangements. The new Trees Programme (non GMPP) is expected to reach completion in 2030.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 2024‑25 Q4, the SRO Delivery Confidence Assessment (DCA) rating at 2025‑26 Q4 decreased to Amber. This reflects a combination of near‑term delivery pressures and pipeline risks, despite strong historical performance and a positive long‑term outlook. Official statistics for 2024‑25 showed a significant year‑on‑year increase in tree planting, with 7,164 hectares delivered in England, the highest annual rate in over 20 years, demonstrating the Programme’s ability to scale delivery. Delivery confidence for 2025‑26 has reduced due to a contraction in the tree planting pipeline since Q3, driven by lower expected output from England Woodland Creation Offer and the Community Forests and weather‑related impacts earlier in the season. Uncertainty over funding going into the final year of delivery will also have impacted the tree planting pipeline This has resulted in forecast delivery of around ~6000ha for the year. Mitigations are in place, including strengthened resourcing, organisational restructuring and the transition to the successor Trees Programme, supported by an approved business case. The rating reflects short‑term uncertainty while longer‑term delivery confidence remains strong, underpinned by improved capability, new funding mechanisms and a clear delivery pathway.","startDate":"2020-04-01","endDate":null,"scheduleNarrative":"Compared to financial year 2024‑25 Q4, the project’s end‑date at 2025‑26 Q4 remained the same, following a one‑year extension that was agreed to enable the design and mobilisation of the successor Trees Programme. The extension provided additional time to put in place future delivery arrangements and secure the necessary approvals, while maintaining continuity of activity. The programme closed at the end of March 2026, with key transition milestones on track and no further changes to the end‑date anticipated.","fyBaseline":255.2,"fyForecast":255.2,"fyVariance":0.0,"varianceNarrative":"The budget variance exceeds 5% by a small margin. This is primarily due to the following factors. The overall NCF Programme for 2025/26 is currently forecasting an underspend of £11.45m, representing a 5.55% variance against the agreed Financial Year baseline (inclusive of a £5.9m Defra underspend). This position remains indicative and subject to minor change as final outturn information is confirmed with ALB delivery partners and wider Defra teams. The majority of the variance relates to CDEL, which is forecast to underspend by £11.23m (6.36% under budget). This reflects slower-than-anticipated delivery across parts of the capital Programme during the year. RDEL performance remained broadly on track. Administration expenditure is forecast to be 0.89% under budget, while Programme expenditure is forecast to underspend by £0.22m (0.74%).","wholeLifeCost":1272.06,"costNarrative":"Compared to financial year 24/25‑Q4, the project’s departmentally agreed Whole Life Cost at 25/26‑Q4 increased to £176.52m CDEL and £29.88m RDEL. This increase is due to an agreed extension to the Programme to allow for the development and transition to a successor Programme. The increase in Whole Life Costs reflects the extended duration of the Programme rather than any change in scope or increase in cost per unit, with underlying delivery costs and assumptions remaining unchanged.","benefits":30171.62,"benefitsNarrative":"Compared to financial year 24/25‑Q4, the project’s departmentally agreed Benefits at 25/26‑Q4 remained unchanged. This is because the agreed outcomes, scope, and benefits methodology have not changed following the Programme extension, which was agreed to allow for the development of a successor Programme. The extension impacts the duration of delivery rather than the nature or scale of benefits, and no new evidence or methodological changes have been introduced that would materially affect the benefits valuation.","themes":["Cost & funding","Delivery & schedule","Scope & requirements","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 2024‑25 Q4, the SRO Delivery Confidence Assessment (DCA) rating at 2025‑26 Q4 decreased to Amber. This reflects a combination of near‑term delivery pressures and pipeline risks, despite strong historical performance and a positive long‑term outlook. Official statistics for 2024‑25 showed a significant year‑on‑year increase in tree…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"DEFRA_0013_2021-Q4","year":2025,"name":"NATURE FOR CLIMATE FUND","department":"DEFRA","category":"Infrastructure and Construction","description":"The Nature for Climate Fund Programme has been established to significantly increase tree planting, woodland creation and management, and peatland restoration in England to support the delivery of Net Zero and 25-Year Environment Plan commitments. The programme is also designed to deliver wider social, economic and environmental benefits.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remains Red. This is primarily due to the following factors‚ The data for the programme is taken up to the 31st of March 2025, and therefore is reflective of the financial uncertainty experienced by the programme in Q4, and difficult weather conditions during planting season. This prevented some planting occurring within the 24/25 financial year, so the programme was unable to deliver the full level of planting or peat restoration needed to meet the required trajectory towards the 2050 statutory target. However, as the programme receives data retrospectively after the end of the financial year, there is now more confidence in 24/25 delivery. The programme is predicted to deliver the highest year of annual planting since the inception of the Nature for Climate Fund, and the last 20 years. Furthermore, the programme's enabling projects have also significantly contributed to the transformation of the forestry sector for example by increasing sector capacity through grants and apprenticeships. The SRO assessment is Amber based on the data that became available in April 2025, and we anticipate subsequent ratings will be Amber when the data is available to all parties.","startDate":"2020-04-01","endDate":null,"scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2025 to 27/06/2025. This is primarily due to the following factors‚ The Nature for Climate Fund programme end date has been provisionally extended to the 31st of March 2026, subject to a review in June 2025, through an extension of the existing programme business case. This allowed the programme to maintain momentum using mature delivery mechanisms for the duration of the 2025/26 financial year whilst further work is carried out to design future tree planting activities.","fyBaseline":287.36,"fyForecast":287.36,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%. The budget variance is less than or equal to 5%.","wholeLifeCost":928.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 928. This is primarily due to the following factors‚ The overall Programme budget and scope was approved through an updated business case in 2022.","benefits":48468.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 48468. This is primarily due to the following factors‚ The total monetised benefits figure is based on the cumulative benefits arising from tree planting and peatland restoration over the course of the NCF programme. Measured over a 50-year appraisal period, these benefits include: carbon sequestration, biodiversity, recreation, flood regulation, air quality and landscape.","themes":["Cost & funding","Technical & integration","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remains Red. This is primarily due to the following factors‚ The data for the programme is taken up to the 31st of March 2025, and therefore is reflective of the financial uncertainty experienced by the programme in Q4, and difficult…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":-1,"transition":"Improved","endDateDeltaDays":null,"attentionScore":18,"attentionReasons":["Current published delivery confidence is Amber"]},{"id":"MOD_0136_2122-Q1","year":2026,"name":"NAVAL SUPPORT INTEGRATED GLOBAL NETWORK (NSIGN)","department":"MOD","category":"Military Capability","description":"The Naval Support Integrated Global Network (NSIGN) is the re-provision of the services contracted through Future Maritime Support Programme, specifically Ship and Submarine engineering and key Naval Base enablers. NSIGN consists of 3 projects, Ships Support, Submarine Support and Naval Bases. Whilst NSIGN will continue to develop the market facing transformation (a combination of single source and competition) it will also utilise Defence frameworks wherever possible, expand the scope for Ships to include non-complex, provide choice for how the Royal Navy will operate in the future, and look at project scope boundaries/opportunities where NSIGN could deliver more effectively.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25-Q4, the NISTA/SRO Delivery Confidence Assessment rating at 25/26-Q4 remained at Amber. This is primarily due to the following factors. 1. The NSIGN Programme is rated Amber to reflect that it is delivering progress across all three Projects through the concept and assessment phases, while continuing to face a small number of significant and interrelated challenges. 2. Progress to date demonstrates a clear strategic direction, increased maturity of user requirements and options, and improved Programme level understanding of dependencies, risks and affordability drivers across the Ships, Submarines and Naval Bases Projects. 3. On going uncertainty on publication of the Defence Investment Plan creates constraints on long term affordability, limiting the Programme’s ability to fully de-risk subsequent delivery stages at this point.","startDate":"2021-12-01","endDate":"2029-12-29","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 22/03/2030. This is primarily due to the following factors. 1. The baseline of the programme and the Integrated Programme Schedules support the deliverability assessment, but timelines remain challenging to contract award with programmes meeting either the current Future Maritime Support Programme expiry dates for planned Future Martime Support Programme extensions (in 2026 and 2028). 2. The active close management of Future Maritime Support Programme Extensions alongside the NSIGN activity are key to mitigating the risks to continuity of service delivery.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Due to the combined nature of the cost model (Submarine, Ships and Naval Base) the figures are not currently available to calculate the In Year variance. Figures will be available once the next business case aligns the elements. Remains within the planned expenditure, noting that Concept Phase activity is confined to Departmental Operating and Legal Costs.","wholeLifeCost":14352.16,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) decreased from £20264.02M to £17000.81M. This is primarily due to the following factors. 1. Programme level Cost Modelling will be finalised on publication of the Defence Investment Plan. 2. The current marginal (<1%) whole life affordability challenge (against a total assessed expenditure of £20bn over 10 years) will be resolved through further cost-modelling and challenge prior to the the NSIGN Ships Invitation to Negotiate (as part of the Outline Business Case approval and Naval Base Outline Business Case and NSIGN Subs Full Business Case in Quarter 1 26/27).","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. NSIGN has a clear benefits strategy focussed on improving availability of assets to support defence outcomes. Benefits plans and profiles continue to mature inline with Outline Business Case and Full Business Case submission timelines.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 24/25-Q4, the NISTA/SRO Delivery Confidence Assessment rating at 25/26-Q4 remained at Amber. This is primarily due to the following factors. 1. The NSIGN Programme is rated Amber to reflect that it is delivering progress across all three Projects through the concept and assessment phases, while continuing to face a small number of…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"MOD_0136_2122-Q1","year":2022,"name":"Naval Support Integrated Global Network (NSIGN)","department":"MOD","category":"Military Capability","description":"The Naval Support Integrated Global Network Programme will deliver Engineering and Equipment Support to Naval Platforms in the Maritime Domain on expiry of the Future Maritime Support Programme. It is a component programme of the Naval Enterprise Support Strategy Portfolio.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure and Project Authority's Delivery Confidence Assessment rating is Amber. This is primarily due to the following factors: Delays to Programme Initiation and availability of Suitably Qualified and Experienced People resource. The outlook is improving as resource is released from the Future Maritime Support Programme that is at the Full Operating Capability transition phase.","startDate":"2021-12-01","endDate":"2026-10-01","scheduleNarrative":"The project end-date is 01 October 2026. This is primarily due to the following factors: The schedule not yet established, the programme is yet to reach Strategic Outline Case.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"The GMPP project did not provide data","wholeLifeCost":null,"costNarrative":"The programme is yet to reach Strategic Outline Case.","benefits":null,"benefitsNarrative":"","themes":["Workforce & capability","Delivery & schedule","Technical & integration"],"evidenceExcerpt":"The Infrastructure and Project Authority's Delivery Confidence Assessment rating is Amber. This is primarily due to the following factors: Delays to Programme Initiation and availability of Suitably Qualified and Experienced People resource. The outlook is improving as resource is released from the Future Maritime Support Programme that is at the Full…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"MOD_0136_2122-Q1","year":2023,"name":"Naval Support Integrated Global Network (NSIGN)","department":"MOD","category":"Military Capability","description":"The Naval Support Integrated Global Network is the re-provision of the services contracted through Future Maritime Support Programme. Whilst Naval Support Integrated Global Network will continue to develop the market facing transformation (a combination of single source and competition) it will also utilise Defence frameworks wherever possible, expand the scope for Ships to align the complex and non-complex, provide choice for how the Royal Navy will operate in the future, and look at scope boundaries/opportunities where Naval Support Integrated Global Network could deliver more effectively.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. Early challenges with Programme initiation, resourcing and mobilisation. An Action Plan is in place which will ensure alignment of key stakeholders to the strategic narrative and industrial strategy.","startDate":"2021-12-01","endDate":"2029-05-22","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 increased from 2026-10-01 to 2029-05-22. This is primarily due to the following factors. The programme is in the pre-concept phase. Key Procurement and Commercial Strategy milestones and the Naval Support Integrated Global Network mobilisation plans will continue to mature as the Programme progresses through Strategic Outline Case, Outline Business Case before being aligned with Full Operating Capability within the Full Business Case.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"","wholeLifeCost":null,"costNarrative":"NA The Programme is yet to reach Outline Business Case.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This programme does not report cashable benefits. Its aim is to provision the armed forces with the equipment and / or infrastructure required.","themes":["Approvals & decisions","Commercial & supply chain","Cost & funding","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. Early challenges with Programme initiation, resourcing and mobilisation. An Action Plan is in place which will ensure alignment of key stakeholders to the strategic…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"MOD_0136_2122-Q1","year":2024,"name":"Naval Support Integrated Global Network (NSIGN)","department":"MOD","category":"Military Capability","description":"The Naval Support Integrated Global Network is the re-provision of the services contracted through Future Maritime Support Programme. Whilst The Naval Support Integrated Global Network will continue to develop the market facing transformation (a combination of single source and competition) it will also utilise Defence frameworks wherever possible, expand the scope for Ships to align the complex and non-complex, provide choice for how the Royal Navy will operate in the future and look at scope boundaries/opportunities where The Naval Support Integrated Global Network could deliver more effectively. The Strategic Outline Case was approved in March 2024 and the Programme is now in the Concept Phase.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. This reflects the significant progress made by the Programme through the difficult early phase of mobilisation and accurately reflects the challenges of mobilisation, scope definition, solution design and alignment.","startDate":"2021-12-01","endDate":"2030-03-22","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 increased from 2029-03-22 to 2029-09-25. This is primarily due to the following factors. Changes in key milestones reflect the delay on transition to the Concept Phase, as a result of a protracted Strategic Outline Case approval and the reality of a Programme early in the scoping and solution design phase.","fyBaseline":null,"fyForecast":null,"fyVariance":0.0,"varianceNarrative":"With scope and solution design still to be finalised in May 2024, the full cost model and analysis of affordability has not been completed.","wholeLifeCost":null,"costNarrative":"With scope and solution design still to be finalised in May 2024, the full cost model and analysis of affordability has not been completed.","benefits":0.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 0m.","themes":["Scope & requirements","Cost & funding","Delivery & schedule","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. This reflects the significant progress made by the Programme through the difficult early phase of mobilisation and accurately reflects the challenges of mobilisation, scope…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"MOD_0136_2122-Q1","year":2025,"name":"NAVAL SUPPORT INTEGRATED GLOBAL NETWORK (NSIGN)","department":"MoD","category":"Military Capability","description":"The Naval Support Integrated Global Network (NSIGN) is the re-provision of the services contracted through Future Maritime Support Programme, specifically Ship and Submarine engineering and key Naval Base enablers. NSIGN consists of 3 projects – Ships Support, Submarine Support and Naval Bases. Whilst NSIGN will continue to develop the market facing transformation (a combination of single source and competition) it will also utilise Defence frameworks wherever possible, expand the scope for Ships to align the complex and non-complex, provide choice for how the Royal Navy will operate in the future, and look at scope boundaries/opportunities where NSIGN could deliver more effectively.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. Following an Assurance Review concluding Red in July 2024 the Programme and Projects have progressed significantly with a subsequent NISTA Assurance Review upgrading Delivery Confidence to Amber, reflecting the significant progress with the maturity of the NSIGN (Submarines) Outline Business Case and the commercial strategy. The programme has made considerable progress, mobilising projects, progressing with project procurement and commercial strategies.","startDate":"2022-09-01","endDate":"2030-03-22","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 22/03/2030. This is primarily due to the following factors. The baseline of the Project and the Integrated Programme Schedules support the deliverability assessment, but timelines remain challenging to contract award with Projects meeting either the current Future Maritime Support Programme (FMSP) expiry dates (in 2026) or the revised expiry dates for the planned extensions (for the period 2026-2028). The active close management of FMSP Extensions alongside the NSIGN activity are key to mitigating the risks to continuity of service delivery.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Due to the combined nature of the cost model (Submarine, Ships and Naval Base) the figures are not currently available to calculate the In Year variance. Figures will be available once the next business case aligns the elements. Remains within the planned expenditure, noting that Concept Phase activity is confined to Departmental Operating and Legal Costs.","wholeLifeCost":20264.02,"costNarrative":"The project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) is 20264. This is primarily due to the following factors. Work is ongoing as part of the current concept phase activity to finalise the Programme Cost Model. A full affordability assessment will be made once the Spending Review has concluded. The current marginal (<1%) whole life affordability challenge (against a total assessed expenditure of £20bn over 10 years) will be resolved through further cost-modelling and challenge prior to the submission of the Naval Support Integrated Global Network (NSIGN) Ships and Naval Base Outline Business Case's and NSIGN Subs Full Business Case in Q3 25/26.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Commercial & supply chain","Approvals & decisions","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. Following an Assurance Review concluding Red in July 2024 the Programme and Projects have progressed significantly with a subsequent NISTA Assurance Review upgrading Delivery Confidence to Amber,…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"MOD_0136_2122-Q1","year":2026,"name":"NAVAL SUPPORT INTEGRATED GLOBAL NETWORK (NSIGN)","department":"MOD","category":"Military Capability","description":"The Naval Support Integrated Global Network (NSIGN) is the re-provision of the services contracted through Future Maritime Support Programme, specifically Ship and Submarine engineering and key Naval Base enablers. NSIGN consists of 3 projects, Ships Support, Submarine Support and Naval Bases. Whilst NSIGN will continue to develop the market facing transformation (a combination of single source and competition) it will also utilise Defence frameworks wherever possible, expand the scope for Ships to include non-complex, provide choice for how the Royal Navy will operate in the future, and look at project scope boundaries/opportunities where NSIGN could deliver more effectively.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25-Q4, the NISTA/SRO Delivery Confidence Assessment rating at 25/26-Q4 remained at Amber. This is primarily due to the following factors. 1. The NSIGN Programme is rated Amber to reflect that it is delivering progress across all three Projects through the concept and assessment phases, while continuing to face a small number of significant and interrelated challenges. 2. Progress to date demonstrates a clear strategic direction, increased maturity of user requirements and options, and improved Programme level understanding of dependencies, risks and affordability drivers across the Ships, Submarines and Naval Bases Projects. 3. On going uncertainty on publication of the Defence Investment Plan creates constraints on long term affordability, limiting the Programme’s ability to fully de-risk subsequent delivery stages at this point.","startDate":"2021-12-01","endDate":"2029-12-29","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 22/03/2030. This is primarily due to the following factors. 1. The baseline of the programme and the Integrated Programme Schedules support the deliverability assessment, but timelines remain challenging to contract award with programmes meeting either the current Future Maritime Support Programme expiry dates for planned Future Martime Support Programme extensions (in 2026 and 2028). 2. The active close management of Future Maritime Support Programme Extensions alongside the NSIGN activity are key to mitigating the risks to continuity of service delivery.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Due to the combined nature of the cost model (Submarine, Ships and Naval Base) the figures are not currently available to calculate the In Year variance. Figures will be available once the next business case aligns the elements. Remains within the planned expenditure, noting that Concept Phase activity is confined to Departmental Operating and Legal Costs.","wholeLifeCost":14352.16,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) decreased from £20264.02M to £17000.81M. This is primarily due to the following factors. 1. Programme level Cost Modelling will be finalised on publication of the Defence Investment Plan. 2. The current marginal (<1%) whole life affordability challenge (against a total assessed expenditure of £20bn over 10 years) will be resolved through further cost-modelling and challenge prior to the the NSIGN Ships Invitation to Negotiate (as part of the Outline Business Case approval and Naval Base Outline Business Case and NSIGN Subs Full Business Case in Quarter 1 26/27).","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. NSIGN has a clear benefits strategy focussed on improving availability of assets to support defence outcomes. Benefits plans and profiles continue to mature inline with Outline Business Case and Full Business Case submission timelines.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 24/25-Q4, the NISTA/SRO Delivery Confidence Assessment rating at 25/26-Q4 remained at Amber. This is primarily due to the following factors. 1. The NSIGN Programme is rated Amber to reflect that it is delivering progress across all three Projects through the concept and assessment phases, while continuing to face a small number of…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"MOD_0136_2122-Q1","year":2025,"name":"NAVAL SUPPORT INTEGRATED GLOBAL NETWORK (NSIGN)","department":"MoD","category":"Military Capability","description":"The Naval Support Integrated Global Network (NSIGN) is the re-provision of the services contracted through Future Maritime Support Programme, specifically Ship and Submarine engineering and key Naval Base enablers. NSIGN consists of 3 projects – Ships Support, Submarine Support and Naval Bases. Whilst NSIGN will continue to develop the market facing transformation (a combination of single source and competition) it will also utilise Defence frameworks wherever possible, expand the scope for Ships to align the complex and non-complex, provide choice for how the Royal Navy will operate in the future, and look at scope boundaries/opportunities where NSIGN could deliver more effectively.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. Following an Assurance Review concluding Red in July 2024 the Programme and Projects have progressed significantly with a subsequent NISTA Assurance Review upgrading Delivery Confidence to Amber, reflecting the significant progress with the maturity of the NSIGN (Submarines) Outline Business Case and the commercial strategy. The programme has made considerable progress, mobilising projects, progressing with project procurement and commercial strategies.","startDate":"2022-09-01","endDate":"2030-03-22","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 22/03/2030. This is primarily due to the following factors. The baseline of the Project and the Integrated Programme Schedules support the deliverability assessment, but timelines remain challenging to contract award with Projects meeting either the current Future Maritime Support Programme (FMSP) expiry dates (in 2026) or the revised expiry dates for the planned extensions (for the period 2026-2028). The active close management of FMSP Extensions alongside the NSIGN activity are key to mitigating the risks to continuity of service delivery.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Due to the combined nature of the cost model (Submarine, Ships and Naval Base) the figures are not currently available to calculate the In Year variance. Figures will be available once the next business case aligns the elements. Remains within the planned expenditure, noting that Concept Phase activity is confined to Departmental Operating and Legal Costs.","wholeLifeCost":20264.02,"costNarrative":"The project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) is 20264. This is primarily due to the following factors. Work is ongoing as part of the current concept phase activity to finalise the Programme Cost Model. A full affordability assessment will be made once the Spending Review has concluded. The current marginal (<1%) whole life affordability challenge (against a total assessed expenditure of £20bn over 10 years) will be resolved through further cost-modelling and challenge prior to the submission of the Naval Support Integrated Global Network (NSIGN) Ships and Naval Base Outline Business Case's and NSIGN Subs Full Business Case in Q3 25/26.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Commercial & supply chain","Approvals & decisions","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. Following an Assurance Review concluding Red in July 2024 the Programme and Projects have progressed significantly with a subsequent NISTA Assurance Review upgrading Delivery Confidence to Amber,…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":-83,"attentionScore":18,"attentionReasons":["Current published delivery confidence is Amber"]},{"id":"DCMS_0018_2021-Q3","year":2026,"name":"Natural History Museum Unlocked","department":"DCMS","category":"Infrastructure and Construction","description":"NHM Unlocked is an ambitious programme to secure the future of our irreplaceable collection, accelerate scientific research and innovation, and enhance our public offer. Underpinned by a £201 million government investment, we are looking to: build a sustainable new centre at Thames Valley Science Park, equipped with purpose-built collections storage, laboratories and 160 Museum scientists; relocate millions of natural history specimens, many of which will be housed in the new centre; and capture digital specimen data for use by partners around the world. The programme will not only enhance the UK’s leading role in tackling urgent global challenges, but also unlock the redevelopment of our historic South Kensington site – transforming our public offer and mission to create advocates for the planet.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Delivery Confidence Assessment (DCA) at 2025/26 Q4 is Amber, the same rating as provided at 2024/25 Q4. The contract for construction at Thames Valley Science Park was awarded at the start of the 2025/26 Financial Year and full contract works commenced on site shortly after. Construction has since progressed well, though it is felt that an Amber rating is appropriate for the programme due to the following factors: (i) A significant amount of procurement remains to be completed (ii) There are a number of complex dependencies which have the potential to impact programme delivery (iii) Even a small change to the construction schedule can have a significant impact on the phasing of programme spend","startDate":"2019-05-15","endDate":null,"scheduleNarrative":"The programme's end date remains September 2031, which is the same date reported at 2024/25 Q4. Construction has progressed slightly ahead of schedule during 2025/26 and is expected to conclude in Summer 2027. Plans for the storage fit out and handover of the building are being finalised, alongside the schedule for moving collections to the new site.","fyBaseline":50.02,"fyForecast":49.95,"fyVariance":0.14,"varianceNarrative":"The budget variance is less than 5% for the 2025/26 Financial Year. The programme budget was recently reprofiled to ensure that phasing of spend is more closely aligned with the latest construction schedule.","wholeLifeCost":213.15,"costNarrative":"The programme's Whole Life Cost (WLC) remains £221m, the same figure reported at 2024/25 Q4. Please note figures referenced in the narratives were entered as nominal and the system automatically converts them to Real Terms.","benefits":2025.56,"benefitsNarrative":"There is no change to the benefits reported at 2024/25 Q4. These remain the same as the figures included in the programme's approved Full Business Case.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain"],"evidenceExcerpt":"The Delivery Confidence Assessment (DCA) at 2025/26 Q4 is Amber, the same rating as provided at 2024/25 Q4. The contract for construction at Thames Valley Science Park was awarded at the start of the 2025/26 Financial Year and full contract works commenced on site shortly after. Construction has since progressed well, though it is felt that an Amber rating…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"DCMS_0018_2021-Q3","year":2021,"name":"Natural History Museum at Harwell","department":"DCMS","category":"Infrastructure and Construction","description":"The �182m DCMS-funded NHM@Harwell programme will create a Science and Digitisation centre to advance global scientific knowledge and the scientific, cultural and wider objectives of the UK Government by transforming the NHM collections' physical environment and improving physical and digital research access to the collections and their associated data. This will enable the Museum to secure and digitise its growing collections for increased research use throughout this century and into the next, providing a springboard for partnerships, and employing and developing new technologies.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber.This is primarily due to the following factors: Our Amber Infrastructure Project Authority's Delivery Confidence Assessment rating is primarily due to the programme being under IPA monitoring. As recommended by the IPA we are making programme budgeting a key focus of our first formal review and have scheduled it in early summer to enable recommendations to be acted on ahead of the outline business case submission. The NHM@Harwell Programme team are also drawing up a shortlist of projects and programmes we would like to benchmark against to improve cost certainty as recommended by IPA. Further to this we have explored our key programme risks, including some related to budget, with DCMS experts and the Natural History Museum's Infrastructure Committee and are planning a formal 'deep dive' review of programme risks with IPA and DCMS. NHM@Harwell are also in ongoing discussions with the DCMS to develop a Memorandum of Understanding with HM Treasury on end year flexibility to ensure effective joint work to manage the programme budget.","startDate":"2019-05-15","endDate":"2026-12-30","scheduleNarrative":"The project end-date is 30 December 2026. This is primarily due to the following factors: The programme is still working to the schedule agreed in the Strategic Outline Case+, with the decision on what collections move to Harwell expected this summer, Royal Institute of British Architects stage 3 of the build programme planned to begin in autumn, and construction commencing in 2023. The scope to bring forward the start date of construction has recently been explored and, following modelling of the knock on consequences for budget and timeline, a decision to retain the current timeline has been taken. This will be kept under review as the Natural History Museum are keen to maximise opportunities to accelerate the build programme where feasible.","fyBaseline":1.54,"fyForecast":1.42,"fyVariance":-8.0,"varianceNarrative":"The budget variance exceeds 5%. Reduction in spend due to underspend in the capital expenditure, slightly offset by an increase in revenue expenditure. Primarily this is driven by delays in the build profile expenditure. This does not reflect a change in the overall programme spend. The memorandum of understanding relating to end year flexibility that the programme are seeking from HM Treasury would would assist in managing future variance.","wholeLifeCost":181.76,"costNarrative":"The projects Baseline Whole Life Cost is �181.76m. This is primarily due to the following factors: Full Budgeted Costs unchanged since previous iteration. Fully funded by DCMS.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber.This is primarily due to the following factors: Our Amber Infrastructure Project Authority's Delivery Confidence Assessment rating is primarily due to the programme being under IPA monitoring. As recommended by the IPA we are making programme budgeting a key focus of our…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21"},{"id":"DCMS_0018_2021-Q3","year":2022,"name":"Natural History Museum at Harwell","department":"DCMS","category":"Infrastructure and Construction","description":"The £182m DCMS-funded NHM@Harwell programme will create a Science and Digitisation centre to advance global scientific knowledge and the scientific, cultural and wider objectives of the UK Government by transforming the NHM collections' physical environment and improving physical and digital research access to the collections and their associated data. This will enable the Museum to secure and digitise its growing collections for increased research use throughout this century and into the next, providing a springboard for partnerships, and employing and developing new technologies.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","startDate":"2019-05-15","endDate":"2026-12-30","scheduleNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","fyBaseline":6.55,"fyForecast":2.92,"fyVariance":-55.0,"varianceNarrative":"The budget variance exceeds 5%. Reduction of capital spend in the year due to delays to RIBA (Royal Institute of British Architects) stages 2 and consequent deferral of RIBA 3. This has led to capital expenditure being pushed later into the project life, and this variance in expenditure being pure phasing of costs and not project underspend. Awaiting guidance on spending review submission points from HM Treasury, which will come at OBC gateway stage.","wholeLifeCost":182.0,"costNarrative":"Compared to 2021-Q4,the projects Baseline Whole Life Cost remained at 181.76 (£m). This is primarily due to the following factors: Full Budgeted Costs unchanged since previous iteration. Fully funded by DCMS.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Commercial & supply chain","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests. Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"DCMS_0018_2021-Q3","year":2023,"name":"Natural History Museum Unlocked","department":"DCMS","category":"Infrastructure and Construction","description":"NHM Unlocked is an ambitious programme to secure the future of our irreplaceable collection, accelerate scientific research and innovation, and enhance our public offer. Underpinned by a 201 million government investment, we are looking to: build a sustainable new centre at Thames Valley Science Park, equipped with purpose-built collections storage, laboratories and 160 Museum scientists; relocate 38 million natural history specimens, of which 28 million will be housed in the new centre; and capture digital specimen data for use by partners around the world. The programme will not only enhance the UKs leading role in tackling urgent global challenges, but also unlock the redevelopment of our historic South Kensington site transforming our public offer and mission to create advocates for the planet.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 is Amber. This is primarily due to the following factors. Rating decreased to red during this year due to delay in agreeing the site lease and having to swiftly enact a mitigation plan which led to deviation from the schedule previously presented in the Strategic Outline Case. Subsequent further changes to the timeline were as a result of a need for an additional assurance review to follow completion of Royal Institute of British Architects stage 2 and precede Outline Business Case resubmission, plus need to revisit RIBA 2 post OBC approval to incorporate area savings on labs and collections areas to meet revised budget and avoid delaying TAP further. Following successful approval of our preferred OBC option the programme considers that there are no major outstanding issues currently threatening successful delivery.","startDate":"2019-05-15","endDate":"2031-09-30","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 increased from 2026-12-30 to 2031-09-30. This is primarily due to the following factors. Delay in agreeing the site lease and having to swiftly enact a mitigation plan led to deviation from the schedule previously presented in the SOC+. Subsequent further changes to the timeline were as a result of a need for an additional assurance review to follow completion of RIBA 2 and precede OBC resubmission, plus need to revisit RIBA 2 post TAP to incorporate area savings on labs and collections areas to meet revised budget and avoid delaying TAP further. The programme also now includes a longer time period for the physical move of collections to the new site as more detailed planning than had taken place at SOC stage identified that additional time would be required to complete one of the largest ever moves of natural history collections.","fyBaseline":6.35,"fyForecast":6.38,"fyVariance":0.0,"varianceNarrative":"The GMPP project did not provide data","wholeLifeCost":229.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 increased from 182m. to 229m. This is primarily due to the following factors. Forecast/actual costs have been rephased to reflect more realistic timelines matching the approved Outline Business Case timeline. Figures reflect recent approved budget allocation following OBC. Actuals and Forecast have all been reclassified as Capital as per ESA 10 directive for R&D. Previously they were split between Resource and Capital, also they now reflect the approved option 4 HMT allocation.","benefits":1985.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 1985m. The project's departmental-agree monetised benefits at 22/23-Q4 is 1985m.The project's departmental-agree monetised benefits at 22/23-Q4 is 1985m.The project's departmental-agree monetised benefits at 22/23-Q4 is 1985m. Monetised benefits presented are from the SOC, updated annualised figures will be presented in the next return. The bulk of the benefits associated with creating a new NHM centre will be felt by UK society, rather than the NHM. Not all the potential benefits are quantifiable. Where benefits have been quantified, the approach to quantification has been deliberately conservative. Benefits primarily arise from improvements to growth potential from creating new scientific infrastructure through an enhanced innovation ecosystem and undertaking scientific research and development. The benefit to cost ratio of the approved delivery option is over 7:1.","themes":["Delivery & schedule","Cost & funding","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 is Amber. This is primarily due to the following factors. Rating decreased to red during this year due to delay in agreeing the site lease and having to swiftly enact a mitigation plan which led to deviation from the schedule previously presented in the Strategic…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"DCMS_0018_2021-Q3","year":2024,"name":"Natural History Museum Unlocked","department":"DCMS","category":"Infrastructure and Construction","description":"NHM Unlocked is an ambitious programme to secure the future of our irreplaceable collection, accelerate scientific research and innovation, and enhance our public offer. Underpinned by a 201 million government investment, we are looking to: build a sustainable new centre at Thames Valley Science Park, equipped with purpose-built collections storage, laboratories and 160 Museum scientists; relocate 38 million natural history specimens, of which 28 million will be housed in the new centre; and capture digital specimen data for use by partners around the world. The programme will not only enhance the UK's leading role in tackling urgent global challenges, but also unlock the redevelopment of our historic South Kensington site - transforming our public offer and mission to create advocates for the planet.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. Rating remains at amber. This follows an IPA Gate 0 review in February 2024 which saw the programme given a delivery confidence assessment of amber, noting that work was continuing at pace across the various projects and that there has been significant positive progress since the approval of the Outline Business Case. Following the review, three actions are being implemented ahead of Full Business Case submission over the summer: 1. Modelling the direct and indirect costs of delay in FBC approval and determining optimum timing for FBC submission. 2. Providing a greater emphasis on the more immediate benefits of the programme in the FBC. 3. Developing a critical path and dependencies map for the collections move project, given its complexity and length.","startDate":"2019-05-15","endDate":"2031-09-30","scheduleNarrative":"The project's end-date at 23/24-Q4 is 2031-09-30. This is primarily due to the following factors. Currently, there is no deviation from the planned schedule.","fyBaseline":5.71,"fyForecast":6.75,"fyVariance":18.0,"varianceNarrative":"For 23/24, the forecast is 6.75m against a baseline of 5.71m, amounting to a variance of 18%. This change is as a result of reprofiling of professional fees for the construction of the new centre (which are to be accrued earlier than previously expected). The overspend is partly offset by 300k underspend from previous years. Predicted and known costs between reporting quarters have been updated in line with forecasted/estimated fees to the end of the project. Work is ongoing regarding tenders for non-professional fee elements of the programme, and this information will be updated as tenders are awarded. It was originally believed this would impact mostly future years' predicted costs. However, it has also now impacted the last quarter of 23/24, with the hope this will have cost benefits later on within the project.","wholeLifeCost":228.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 decreased from 229m. to 228m. This is primarily due to the following factors: As of 23/24 Q4, the total project forecast is 230.12m, amounting to a variance of 0.7%. Forecasts for FY 23/24 have been reviewed in detail for known and probable variances, with subsequent financial years being updated to reflect predicted costs and possible inflation at that time. We are currently forecasting an overspend for 2023/24. This is lower than our agreed 20% flexibility and predominantly due to reprofiling of professional fees related to the construction of the new centre from 24/25.","benefits":1698.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 2324-Q4 decreased from 1985m. to 1698m. This change is due to the benefits being updated after OBC approval to reflect the latest economic analysis conducted for the OBC. The previous £1985m estimate was from the SOC stage in March 2020.","themes":["Delivery & schedule","Cost & funding","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. Rating remains at amber. This follows an IPA Gate 0 review in February 2024 which saw the programme given a delivery confidence assessment of amber, noting that work was continuing at pace across the various…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"DCMS_0018_2021-Q3","year":2025,"name":"Natural History Museum Unlocked","department":"DCMS","category":"Infrastructure and Construction","description":"NHM Unlocked is an ambitious programme to secure the future of the Natural History Museum's irreplaceable collections, accelerate scientific research and innovation, and enhance our public offer. Underpinned by a £201 million government investment, we are looking to: (i) build a sustainable new centre at Thames Valley Science Park, equipped with purpose-built collections storage and laboratories; (ii) relocate 38 million natural history specimens, 28 million of which will be housed in the new centre; and (iii) enable the capture of digital specimen data for use by partners around the world. The programme will also ensure that gallery space can be freed up at our historic South Kensington site, enabling its redevelopment to transform our public offer and mission to create advocates for the planet.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors: At the end of the 24/25 Financial Year, the construction contract for the new building at TVSP was still being negotiated. Although funding for Unlocked was confirmed through the approval of the Final Business Case in January 2025, the agreement of the contract was key to enabling budget certainty and no delays to the construction timeline. It was therefore felt that an Amber DCA was more appropriate whilst contract negotiations were ongoing, though it should be noted that the construction contract has subsequently been awarded.","startDate":"2019-05-15","endDate":"2031-09-30","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 30/09/2031. This is primarily due to the following factors: Critical programme activity in 2024/25, including approval of the programme's Final Business Case and negotiation of the construction contract, continued on track or with small delays which were within tolerance levels. This means that the programme's projected end date remained the same as it was at the end of 2023/24.","fyBaseline":23.76,"fyForecast":23.32,"fyVariance":1.85,"varianceNarrative":"The budget variance is less than or equal to 5%. The 2024/25 actual spend for the programme of £23.32m represents a small underspend against the £23.76m baseline. This underspend is well within the 10% Departmental tolerance and will be rolled forward to FY 25/26. The underspend is partly due to an ongoing review of resource requirements across some areas of the programme, which has resulted in fewer posts being recruited than originally anticipated, in turn reducing staff costs.","wholeLifeCost":221.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 228 to 221. This is primarily due to the following factors: The financial figures reported at the end of the 24/25 Financial Year are from the Final Business Case (FBC), approved by Treasury in January 2025. In 23/24, figures from the 2023 Outline Business Case (OBC) were being reported, which included some associated programme costs that are no longer in the core Unlocked budget.","benefits":1946.81,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 1698 to 1946. This is primarily due to the following factors: The benefits figures reported at the end of the 24/25 Financial Year are from the Final Business Case (FBC), approved by Treasury in January 2025. Previously, figures from the 2023 Outline Business Case (OBC) were being reported. As part of the process of putting together the FBC, the benefits figures were updated to reflect the latest economic analysis.","themes":["Cost & funding","Approvals & decisions","Commercial & supply chain","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors: At the end of the 24/25 Financial Year, the construction contract for the new building at TVSP was still being negotiated. Although funding for Unlocked was confirmed…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"DCMS_0018_2021-Q3","year":2026,"name":"Natural History Museum Unlocked","department":"DCMS","category":"Infrastructure and Construction","description":"NHM Unlocked is an ambitious programme to secure the future of our irreplaceable collection, accelerate scientific research and innovation, and enhance our public offer. Underpinned by a £201 million government investment, we are looking to: build a sustainable new centre at Thames Valley Science Park, equipped with purpose-built collections storage, laboratories and 160 Museum scientists; relocate millions of natural history specimens, many of which will be housed in the new centre; and capture digital specimen data for use by partners around the world. The programme will not only enhance the UK’s leading role in tackling urgent global challenges, but also unlock the redevelopment of our historic South Kensington site – transforming our public offer and mission to create advocates for the planet.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Delivery Confidence Assessment (DCA) at 2025/26 Q4 is Amber, the same rating as provided at 2024/25 Q4. The contract for construction at Thames Valley Science Park was awarded at the start of the 2025/26 Financial Year and full contract works commenced on site shortly after. Construction has since progressed well, though it is felt that an Amber rating is appropriate for the programme due to the following factors: (i) A significant amount of procurement remains to be completed (ii) There are a number of complex dependencies which have the potential to impact programme delivery (iii) Even a small change to the construction schedule can have a significant impact on the phasing of programme spend","startDate":"2019-05-15","endDate":null,"scheduleNarrative":"The programme's end date remains September 2031, which is the same date reported at 2024/25 Q4. Construction has progressed slightly ahead of schedule during 2025/26 and is expected to conclude in Summer 2027. Plans for the storage fit out and handover of the building are being finalised, alongside the schedule for moving collections to the new site.","fyBaseline":50.02,"fyForecast":49.95,"fyVariance":0.14,"varianceNarrative":"The budget variance is less than 5% for the 2025/26 Financial Year. The programme budget was recently reprofiled to ensure that phasing of spend is more closely aligned with the latest construction schedule.","wholeLifeCost":213.15,"costNarrative":"The programme's Whole Life Cost (WLC) remains £221m, the same figure reported at 2024/25 Q4. Please note figures referenced in the narratives were entered as nominal and the system automatically converts them to Real Terms.","benefits":2025.56,"benefitsNarrative":"There is no change to the benefits reported at 2024/25 Q4. These remain the same as the figures included in the programme's approved Full Business Case.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain"],"evidenceExcerpt":"The Delivery Confidence Assessment (DCA) at 2025/26 Q4 is Amber, the same rating as provided at 2024/25 Q4. The contract for construction at Thames Valley Science Park was awarded at the start of the 2025/26 Financial Year and full contract works commenced on site shortly after. Construction has since progressed well, though it is felt that an Amber rating…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"DCMS_0018_2021-Q3","year":2025,"name":"Natural History Museum Unlocked","department":"DCMS","category":"Infrastructure and Construction","description":"NHM Unlocked is an ambitious programme to secure the future of the Natural History Museum's irreplaceable collections, accelerate scientific research and innovation, and enhance our public offer. Underpinned by a £201 million government investment, we are looking to: (i) build a sustainable new centre at Thames Valley Science Park, equipped with purpose-built collections storage and laboratories; (ii) relocate 38 million natural history specimens, 28 million of which will be housed in the new centre; and (iii) enable the capture of digital specimen data for use by partners around the world. The programme will also ensure that gallery space can be freed up at our historic South Kensington site, enabling its redevelopment to transform our public offer and mission to create advocates for the planet.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors: At the end of the 24/25 Financial Year, the construction contract for the new building at TVSP was still being negotiated. Although funding for Unlocked was confirmed through the approval of the Final Business Case in January 2025, the agreement of the contract was key to enabling budget certainty and no delays to the construction timeline. It was therefore felt that an Amber DCA was more appropriate whilst contract negotiations were ongoing, though it should be noted that the construction contract has subsequently been awarded.","startDate":"2019-05-15","endDate":"2031-09-30","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 30/09/2031. This is primarily due to the following factors: Critical programme activity in 2024/25, including approval of the programme's Final Business Case and negotiation of the construction contract, continued on track or with small delays which were within tolerance levels. This means that the programme's projected end date remained the same as it was at the end of 2023/24.","fyBaseline":23.76,"fyForecast":23.32,"fyVariance":1.85,"varianceNarrative":"The budget variance is less than or equal to 5%. The 2024/25 actual spend for the programme of £23.32m represents a small underspend against the £23.76m baseline. This underspend is well within the 10% Departmental tolerance and will be rolled forward to FY 25/26. The underspend is partly due to an ongoing review of resource requirements across some areas of the programme, which has resulted in fewer posts being recruited than originally anticipated, in turn reducing staff costs.","wholeLifeCost":221.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 228 to 221. This is primarily due to the following factors: The financial figures reported at the end of the 24/25 Financial Year are from the Final Business Case (FBC), approved by Treasury in January 2025. In 23/24, figures from the 2023 Outline Business Case (OBC) were being reported, which included some associated programme costs that are no longer in the core Unlocked budget.","benefits":1946.81,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 1698 to 1946. This is primarily due to the following factors: The benefits figures reported at the end of the 24/25 Financial Year are from the Final Business Case (FBC), approved by Treasury in January 2025. Previously, figures from the 2023 Outline Business Case (OBC) were being reported. As part of the process of putting together the FBC, the benefits figures were updated to reflect the latest economic analysis.","themes":["Cost & funding","Approvals & decisions","Commercial & supply chain","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors: At the end of the 24/25 Financial Year, the construction contract for the new building at TVSP was still being negotiated. Although funding for Unlocked was confirmed…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":null,"attentionScore":18,"attentionReasons":["Current published delivery confidence is Amber"]},{"id":"DECC_0010_1112-Q1","year":2026,"name":"Smart Metering Implementation Programme","department":"DESNZ","category":"Infrastructure and Construction","description":"The Smart Metering Implementation Programme is replacing existing traditional gas and electricity meters across Great Britain with smart meters. Smart meters deliver near-real time information to consumers on their energy consumption, and helps them to control energy use, save energy and reduce bills. They also enable technologies such as electric vehicles, heat pumps, batteries and solar panels to be efficiently and cost-effectively integrated to a flexible energy system that supports the cost-effective delivery of government’s Clean Power 2030 and Net Zero commitments. The Government is committed to ensuring that all households and small businesses can benefit from smart meters as soon as possible. Regulatory drivers are in place to drive industry investment in the delivery and operation of smart metering at scale.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at AMBER. This is primarily due to the following factors: Smart metering continues to deliver benefits to consumers, such as engagement on energy consumption, accurate energy bills and improved customer service, and is key to the 2030 Clean Power Mission. There were 41 million smart and advanced meters operating across Great Britain at the end of 2025 and 71% of all meters are now smart or advanced. A new regulatory framework is now in place to drive industry to maintain high levels of operational performance whilst effectively completing the rollout by 2030. There is continued collaboration with stakeholders including energy suppliers and the Data Communications Company to drive further improvements in engagement, appointment fulfilment and operation of meters, and ensuring technology roadmaps for the next decade are suitably developed and addressed. Improvements to the network continue to be made including deployment of 4G Communications Hubs at scale and launch of the Virtual Wide Area Network solution that allows consumers to access smart metering services through their broadband (with consent).","startDate":"2009-12-02","endDate":"2030-12-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same as last year at 31/12/2030. This is primarily due to the following factors: SMIP continues to make good progress with the successful delivery of the smart meter rollout in delivering its strategic outcomes. Progress continues with circa.90k+ gross installs per week and a continued increasing proportion of meters installed (71% as of end 2025) and operating as they should (92.3%). The new regulatory framework to 2030 will continue to deliver industry investment at scale and drive high levels of operational performance and smart coverage, which are key to the 2030 Clean Power Mission.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":20176.55,"costNarrative":"The programme’s departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) is 20177. The total whole life cost figures are presented in undiscounted nominal terms. The figure differs from the total cost figure in the Smart Metering Implementation Programme’s 2019 CBA, which is expressed in 2011 prices discounted to 2019 in line with HM Treasury appraisal guidance. This reflects the latest economic appraisal of the costs of the programme, including (but not limited to) costs from new assets, installation visits and setting up and operating the new communications infrastructure.","benefits":34130.34,"benefitsNarrative":"Compared to financial year 24/25-Q4, the programme’s departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained the same as last year at 34130. This is primarily due to the following factors: The total whole life benefits figures are presented in undiscounted nominal terms, for comparability with other programmes. The figure differs from the total benefit figure in the Smart Metering Implementation Programme’s 2019 CBA, which is expressed in 2011 prices discounted to 2019 in line with HM Treasury appraisal guidance. This reflects the latest economic appraisal of the benefits of the programme, including (but not limited to) benefits from reduced energy consumption, reduced greenhouse gas emissions, reduced site visits by suppliers, improved network management, and improved customer switching.","themes":["Cost & funding","Delivery & schedule","Technical & integration","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at AMBER. This is primarily due to the following factors: Smart metering continues to deliver benefits to consumers, such as engagement on energy consumption, accurate energy bills and improved customer service, and is key to the 2030 Clean Power…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"DECC_0010_1112-Q1","year":2020,"name":"Smart Metering Implementation Programme","department":"BEIS","category":"Infrastructure and Construction","description":"To offer every home and small business a Smart Meter by 2020.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber, which has improved since last year�s Q2 1819 Amber/Red, due primarily to the following factors; - There are now c.17 million smart and advanced meters operating across Great Britain. - The Programme has worked with industry delivery partners to successfully implement complex technical solutions that will transform the customer experience. - The Programme has updated its Cost-Benefit Analysis. Since the Q2 1920 (30th September 2019) Amber IPA DCA, the following primary project actions have impacted the original Q2 IPA DCA; - The Programme has consulted on a new regulatory framework for energy suppliers to drive market-wide completion of the smart meter rollout as soon as practicable. - The Programme continues to work with industry delivery partners to implement and drive market-wide completion, while also taking into account the impact of COVID-19.","startDate":"2009-12-02","endDate":"2024-12-31","scheduleNarrative":"The scheduled baseline project end date at Q2 1920 (30th September 2019) is 31/12/24, has lengthened by 1461 days since last year's Q2 1819 date of 31/12/20, due primarily to the following factors; - The Programme is on schedule to meet the commitment for every home and small business to be offered a Smart Meter by the end of 2020. - The updated 2019 Cost-Benefit Analysis includes an extended appraisal period so the Programme has consulted on the introduction of a new regulatory framework for energy suppliers that supports market-wide rollout of smart meters as soon as practicable. Since the Q2 1920 (30th September 2019) baseline project end date of 31/12/24, the following primary project actions have impacted the original Q2 baseline project end date; - A thorough evaluation of the new regulatory framework consultation responses has been conducted. - The impact of COVID-19 is being considered with key stakeholders and assessed by the Programme.","fyBaseline":1065.9,"fyForecast":1065.9,"fyVariance":0.0,"varianceNarrative":"Budget variance less than 5%","wholeLifeCost":20136.95,"costNarrative":"The baseline Whole Life Cost at Q2 1920 (30th September 2019) is �20,136.95 m, has increased by �2921.18 m since last year's Q2 1819 (�m) baseline Whole Life Cost of �17,215.78 m, due primarily to the following factors; - The updated 2019 Cost-Benefit Analysis includes an extended appraisal period. As a result, it captures both additional costs and additional benefits over the new appraisal period. - Overall, the benefits have increased by more than the costs resulting in an increase in the net benefits for the Programme. Since the Q2 1920 (30th September 2019) �20,136.95 m baseline Whole Life Cost, the following primary project actions have impacted the original Q2 baseline Whole Life Cost; - A lessons learned exercise around the new Cost-Benefit Analysis has been conducted. - Programme costs continue to be effectively managed, and addressed through appropriate governance groups.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Governance & assurance"],"evidenceExcerpt":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber, which has improved since last year�s Q2 1819 Amber/Red, due primarily to the following factors; - There are now c.17 million smart and advanced meters operating across Great Britain. - The Programme has worked with industry delivery partners to successfully…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2020","sourceLabel":"IPA Annual Report 2019-20"},{"id":"DECC_0010_1112-Q1","year":2021,"name":"Smart Metering Implementation Programme","department":"BEIS","category":"Infrastructure and Construction","description":"The Programme aims to replace existing traditional gas and electricity meters across Great Britain with smart gas and electricity meters resulting in a cleaner, cheaper and more reliable energy system. Smart meters are a key enabler of technologies such as electric vehicles, smart tariffs and microgeneration to be efficiently integrated with renewable energy sources, underpinning the cost-effective delivery of Government's net zero commitment.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber. This is primarily due to the following factors: The IPA and SRO Delivery Confidence Assessment (DCA) rating has continued to be Amber, due primarily to the following factors; - There were 23.6 million smart and advanced meters operating across Great Britain as of end December 2020 - A new regulatory framework was announced in June 2020 for implementation in July 2021. - Re-mobilisation support across industry delivery partners was established to respond to the impact of COVID-19. Industry has made good progress in re-mobilising workforces and BEIS has continued to provide support to industry through the latest national lockdown. - Customer smart meter eligibility is increasing following positive developments on resolution of residual technical issues. - BEIS continues to work with energy suppliers to increase consumer uptake through improved consumer engagement and operational fulfilment activities, supported by consumer policies, and to drive faster progress towards a market wide roll-out.","startDate":"2009-12-02","endDate":"2025-06-30","scheduleNarrative":"Compared to financial year 19/20-Q2, the project's end-date increased from 31 December 2024 to 30 June 2025 . This is primarily due to the following factors: Energy suppliers were given an additional six months to meet their smart metering obligations, recognising that COVID-19 and lockdowns restricted energy suppliers' ability to enter premises. The scheduled baseline project end date is now 30 June 2025.","fyBaseline":1139.18,"fyForecast":1139.86,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%. Budget variance less than 5%","wholeLifeCost":20136.95,"costNarrative":"Compared to financial year 19/20-Q2, the projects Baseline Whole Life Cost remained at �20136.95m. This is primarily due to the following factors: In comparison with 19/20 Q2 the Baseline Whole Life Cost has remained constant.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber. This is primarily due to the following factors: The IPA and SRO Delivery Confidence Assessment (DCA) rating has continued to be Amber, due primarily to the following factors; - There were 23.6 million smart and advanced meters…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21"},{"id":"DECC_0010_1112-Q1","year":2022,"name":"Smart Metering Implementation Programme","department":"BEIS","category":"Infrastructure and Construction","description":"The Programme aims to replace existing traditional gas and electricity meters across Great Britain with smart gas and electricity meters resulting in a cleaner, cheaper and more reliable energy system. Smart meters are a key enabler of technologies such as electric vehicles, smart tariffs and microgeneration to be efficiently integrated with renewable energy sources, underpinning the cost-effective delivery of Government's net zero commitment.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 20/21-Q4, the Delivery Confidence Assessment rating at 21/22-Q4 remained at Amber The IPA and SRO Delivery Confidence Assessment (DCA) rating has continued to be Amber, due primarily to the following factors: - There were 27.8 million smart and advanced meters operating across Great Britain as of end December 2021. - A new 4 year regulatory framework was implementation on 1st January 2022. - Re-mobilisation support across industry delivery partners was established to respond to the impact of COVID-19. Industry has made good progress in re-mobilising workforces and BEIS has continued to provide support to industry. - Customer smart meter eligibility is increasing following positive developments on resolution of residual technical issues. - BEIS continues to work with energy suppliers to increase consumer uptake through improved consumer engagement and operational fulfilment activities, supported by consumer policies, and to drive faster progress towards a market wide roll-out.","startDate":"2009-12-02","endDate":"2025-12-31","scheduleNarrative":"Compared to 2021-Q4, your project end-date increased from 30 JUN 2025 to 31 DEC 2025 . This is primarily due to the following factors: The obligation on energy suppliers to take all reasonable steps to install smart meters was extended by six months to 31 December 2021 to enable them to manage disruption caused by COVID-19. Consistent with this decision, the new four-year Targets Framework commenced on 1 January 2022 and will end on 31 December 2025.","fyBaseline":9.9,"fyForecast":9.9,"fyVariance":0.0,"varianceNarrative":"The budget variance is inferior or equal to 5%.","wholeLifeCost":20147.0,"costNarrative":"Compared to2021-Q4, the projects Baseline Whole Life Cost increased from 20136.95 (£m) to 20146.85 (£m). This is primarily due to the following factors: The baseline Whole Life Cost has increased from £20,136.95m to £20,146.85 as it now includes the agreed programme costs for 2021/2022 which were confirmed through the BEIS business planning process.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Delivery Confidence Assessment rating at 21/22-Q4 remained at Amber The IPA and SRO Delivery Confidence Assessment (DCA) rating has continued to be Amber, due primarily to the following factors: - There were 27.8 million smart and advanced meters operating across Great Britain as of end December 2021. - A new 4 year…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"DECC_0010_1112-Q1","year":2023,"name":"Smart Metering Implementation Programme","department":"DESNZ","category":"Infrastructure and Construction","description":"The Programme aims to replace existing traditional gas and electricity meters across Great Britain with smart gas and electricity meters resulting in a cleaner, cheaper and more reliable energy system. Smart meters are a key enabler of technologies such as electric vehicles, smart tariffs and microgeneration to be efficiently integrated with renewable energy sources, underpinning the cost-effective delivery of Government's net zero commitment.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 21/22-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. - There were 32.4 million smart and advanced meters operating across Great Britain as of end March 2023.- A new 4-year regulatory framework was implemented on 1st January 2022 with minimum installation targets set for energy suppliers for 2022 and 2023.- Work is underway on the Mid-Point review of the Targets Framework. A consultation on minimum installation targets for years 3 and 4 of the Framework (2024 and 2025) closed on 21 March and responses are now being reviewed.- Customer smart meter technical eligibility moved to 99% in January 2023 with the controlled commencement of Alternative Home Area Network solution installations. Deployment is due to enter the mass rollout phase later in 2023. - DESNZ/SMIP continues to work with energy suppliers to improve consumer engagement and operational fulfilment activities to strengthen and increase consumer uptake and to continue to support installations at scale.","startDate":"2009-12-02","endDate":"2025-12-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2025-12-31. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2025-12-31. This is primarily due to the following factors. The new four-year installation Targets Framework commenced on 1 January 2022 and will end on 31 December 2025.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"The budget variance is inferior or equal to 5%.","wholeLifeCost":20177.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 increased from 20147m. to 20177m. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 increased from 20147m. to 20177m. This is primarily due to the following factors. The whole life cost figure now reflecting the baseline budgets that were confirmed as part of the Spending Review 2021.","benefits":34130.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 34130m. Benefits arise to a number of different groups - to energy consumers in the form of bill savings through reduced consumption and time savings through reduced need to interact with the metering system, to energy suppliers in the form of operational efficiencies (e.g. no more site visits for meter reads, fewer calls to complain about inaccurate / estimated bills), to distribution network operators (e.g. in the form of more targeted investment decisions) and to society as a whole (e.g. in the form of reduced carbon emissions). Benefits break down into around 39% directly to consumers, around 50% to the energy industry (which we expect will be passed through to consumers in the form of lower energy prices) and around 10% in societal benefits to the UK.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. - There were 32.4 million smart and advanced meters operating across Great Britain as of end March 2023.- A new 4-year regulatory framework was implemented on 1st January…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"DECC_0010_1112-Q1","year":2024,"name":"Smart Metering Implementation Programme","department":"DESNZ","category":"Infrastructure and Construction","description":"The Programme aims to replace existing traditional gas and electricity meters across Great Britain with smart gas and electricity meters resulting in a cleaner, cheaper and more reliable energy system. Smart meters are a key enabler of technologies such as electric vehicles, smart tariffs and microgeneration to be efficiently integrated with renewable energy sources, underpinning the cost-effective delivery of Government's net zero commitment.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The IPA and SRO DCA rating has continued to be Amber, based on the following: - There were 35.5 million smart and advanced meters operating across Great Britain at the end of March 2024. - Continuing implementation of a 4-year regulatory framework to the end of 2025 which sets minimum annual installation targets for energy suppliers. This ensures that suppliers continue to deliver new installations at scale, bringing smart metering benefits to consumers, such as feedback on energy consumption (evaluation shows this leads to reductions in energy use), accurate energy bills and improved customer service. - Continued collaboration with energy suppliers to recruit, train and maintain the installer workforce required for delivering smart meters and the supporting consumer engagement (e.g. energy efficiency advice). - Driving the 4G Transition including operational planning, to enable an efficient transition to 4G installs and completion of the 4G upgrade for 2G/3G Communication Hubs by 2033.","startDate":"2009-12-02","endDate":"2025-12-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2025-12-31. This is primarily due to the following factors. The new four-year installation Targets Framework commenced on 1 January 2022 and will end on 31 December 2025.","fyBaseline":1320.98,"fyForecast":1320.98,"fyVariance":0.0,"varianceNarrative":"The budget variance is inferior or equal to 5%.","wholeLifeCost":20177.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 remained at 20177m. This is primarily due to the following factors. The whole life cost figure now reflecting the baseline budgets that were confirmed as part of the Spending Review 2021.","benefits":34130.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 34130m. Benefits arise to a number of different groups - to energy consumers in the form of bill savings through reduced consumption and time savings through reduced need to interact with the metering system, to energy suppliers in the form of operational efficiencies (e.g. no more site visits for meter reads, fewer calls to complain about inaccurate / estimated bills), to distribution network operators (e.g. in the form of more targeted investment decisions) and to society as a whole (e.g. in the form of reduced carbon emissions). Benefits break down into around 39% directly to consumers, around 50% to the energy industry (which we expect will be passed through to consumers in the form of lower energy prices) and around 10% in societal benefits to the UK.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The IPA and SRO DCA rating has continued to be Amber, based on the following: - There were 35.5 million smart and advanced meters operating across Great Britain at the end of…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"DECC_0010_1112-Q1","year":2025,"name":"Smart Metering Implementation Programme","department":"DESNZ","category":"Infrastructure and Construction","description":"The Smart Metering Implementation Programme seeks to replace existing traditional gas and electricity meters across Great Britain with smart meters resulting in a cleaner, cheaper and more flexible energy system. Smart meters deliver consumers with near-real time information on their energy consumption to help them control energy use, save energy and reduce bills. They also enable technologies such as electric vehicles to be efficiently and cost-effectively integrated with renewable energy sources, supporting the cost-effective delivery of Government’s 2030 Clean Power and Net Zero commitments. The government is committed to ensuring that households and small businesses can benefit from smart meters as soon as possible. Regulatory drivers are in place to drive industry investment in smart metering at scale.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Smart metering continues to deliver benefits to consumers, such as engagement on energy consumption, accurate energy bills and improved customer service, and is key to the 2030 Clean Power Mission and enabling Net Zero. There were 39 million smart and advanced meters operating across Great Britain at the end of Q1 2025. The 4-year Regulatory Framework to the end of 2025 sets minimum annual installation targets for energy suppliers and continues to drive suppliers to invest appropriately to deliver new installations at scale. There is continued collaboration with stakeholders including energy suppliers and the Data Communications Company to drive improvements in engagement, appointment fulfilment and the operation of meters, and ensuring technology roadmaps for the next decade are suitably developed and addressed. Driving good progress on an efficient transition from 2G/3G to 4G Communications Hubs (4G CHs) by 2033. Actively developing consultation proposals for the Regulatory Framework required for post 2025 to give investment clarity to industry. The size, scale and complexity of such an industry change programme with numerous energy sector stakeholders reflects why SMIP has remained with an AMBER rating.","startDate":"2009-12-02","endDate":"2030-12-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/12/2025 to 31/12/2030. This is primarily due to the following factors‚ SMIP’s current 4-year Regulatory Framework runs to the end of 2025 and the project end-date was set to mirror this timing. The existing Regulatory Framework sets minimum annual installation targets for energy suppliers and continues to drive suppliers to invest appropriately to deliver new installations at scale. We are actively developing consultation proposals for the Regulatory Framework required for post 2025 to give investment clarity to industry and support the Government’s 2030 Clean Power mission – the project end-date has been updated to reflect this.","fyBaseline":1320.98,"fyForecast":1320.98,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%. The budget variance is less than or equal to 5%.","wholeLifeCost":20177.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 20177. This is primarily due to the following factors‚ The total whole life cost figures in this return are presented in undiscounted nominal terms, for comparability with other programmes. The figure differs from the total cost figure in the Smart Metering Implementation Programme’s 2019 CBA, which is expressed in 2011 prices discounted to 2019 in line with HM Treasury appraisal guidance. This reflects the latest economic appraisal of the costs (and benefits) of the programme, including (but not limited to) costs from new assets and installation, setting up new communications infrastructure, and benefits including (but not limited to) reduced energy consumption, reduced greenhouse gas emissions, reduced site visits by suppliers, improved network management, and improved customer switching.","benefits":34130.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 34130. This is primarily due to the following factors‚ The total whole life benefits figures in this return are presented in undiscounted nominal terms, for comparability with other programmes. The figure differs from the total benefit figure in the Smart Metering Implementation Programme’s 2019 CBA, which is expressed in 2011 prices discounted to 2019 in line with HM Treasury appraisal guidance. This reflects the latest economic appraisal of the benefits (and costs) of the programme, including (but not limited to) costs from new assets and installation, setting up new communications infrastructure, and benefits including (but not limited to) reduced energy consumption, reduced greenhouse gas emissions, reduced site visits by suppliers, improved network management, and improved customer switching.","themes":["Cost & funding","Delivery & schedule","Technical & integration"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Smart metering continues to deliver benefits to consumers, such as engagement on energy consumption, accurate energy bills and improved customer service, and is key…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"DECC_0010_1112-Q1","year":2026,"name":"Smart Metering Implementation Programme","department":"DESNZ","category":"Infrastructure and Construction","description":"The Smart Metering Implementation Programme is replacing existing traditional gas and electricity meters across Great Britain with smart meters. Smart meters deliver near-real time information to consumers on their energy consumption, and helps them to control energy use, save energy and reduce bills. They also enable technologies such as electric vehicles, heat pumps, batteries and solar panels to be efficiently and cost-effectively integrated to a flexible energy system that supports the cost-effective delivery of government’s Clean Power 2030 and Net Zero commitments. The Government is committed to ensuring that all households and small businesses can benefit from smart meters as soon as possible. Regulatory drivers are in place to drive industry investment in the delivery and operation of smart metering at scale.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at AMBER. This is primarily due to the following factors: Smart metering continues to deliver benefits to consumers, such as engagement on energy consumption, accurate energy bills and improved customer service, and is key to the 2030 Clean Power Mission. There were 41 million smart and advanced meters operating across Great Britain at the end of 2025 and 71% of all meters are now smart or advanced. A new regulatory framework is now in place to drive industry to maintain high levels of operational performance whilst effectively completing the rollout by 2030. There is continued collaboration with stakeholders including energy suppliers and the Data Communications Company to drive further improvements in engagement, appointment fulfilment and operation of meters, and ensuring technology roadmaps for the next decade are suitably developed and addressed. Improvements to the network continue to be made including deployment of 4G Communications Hubs at scale and launch of the Virtual Wide Area Network solution that allows consumers to access smart metering services through their broadband (with consent).","startDate":"2009-12-02","endDate":"2030-12-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same as last year at 31/12/2030. This is primarily due to the following factors: SMIP continues to make good progress with the successful delivery of the smart meter rollout in delivering its strategic outcomes. Progress continues with circa.90k+ gross installs per week and a continued increasing proportion of meters installed (71% as of end 2025) and operating as they should (92.3%). The new regulatory framework to 2030 will continue to deliver industry investment at scale and drive high levels of operational performance and smart coverage, which are key to the 2030 Clean Power Mission.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":20176.55,"costNarrative":"The programme’s departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) is 20177. The total whole life cost figures are presented in undiscounted nominal terms. The figure differs from the total cost figure in the Smart Metering Implementation Programme’s 2019 CBA, which is expressed in 2011 prices discounted to 2019 in line with HM Treasury appraisal guidance. This reflects the latest economic appraisal of the costs of the programme, including (but not limited to) costs from new assets, installation visits and setting up and operating the new communications infrastructure.","benefits":34130.34,"benefitsNarrative":"Compared to financial year 24/25-Q4, the programme’s departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained the same as last year at 34130. This is primarily due to the following factors: The total whole life benefits figures are presented in undiscounted nominal terms, for comparability with other programmes. The figure differs from the total benefit figure in the Smart Metering Implementation Programme’s 2019 CBA, which is expressed in 2011 prices discounted to 2019 in line with HM Treasury appraisal guidance. This reflects the latest economic appraisal of the benefits of the programme, including (but not limited to) benefits from reduced energy consumption, reduced greenhouse gas emissions, reduced site visits by suppliers, improved network management, and improved customer switching.","themes":["Cost & funding","Delivery & schedule","Technical & integration","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at AMBER. This is primarily due to the following factors: Smart metering continues to deliver benefits to consumers, such as engagement on energy consumption, accurate energy bills and improved customer service, and is key to the 2030 Clean Power…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"DECC_0010_1112-Q1","year":2025,"name":"Smart Metering Implementation Programme","department":"DESNZ","category":"Infrastructure and Construction","description":"The Smart Metering Implementation Programme seeks to replace existing traditional gas and electricity meters across Great Britain with smart meters resulting in a cleaner, cheaper and more flexible energy system. Smart meters deliver consumers with near-real time information on their energy consumption to help them control energy use, save energy and reduce bills. They also enable technologies such as electric vehicles to be efficiently and cost-effectively integrated with renewable energy sources, supporting the cost-effective delivery of Government’s 2030 Clean Power and Net Zero commitments. The government is committed to ensuring that households and small businesses can benefit from smart meters as soon as possible. Regulatory drivers are in place to drive industry investment in smart metering at scale.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Smart metering continues to deliver benefits to consumers, such as engagement on energy consumption, accurate energy bills and improved customer service, and is key to the 2030 Clean Power Mission and enabling Net Zero. There were 39 million smart and advanced meters operating across Great Britain at the end of Q1 2025. The 4-year Regulatory Framework to the end of 2025 sets minimum annual installation targets for energy suppliers and continues to drive suppliers to invest appropriately to deliver new installations at scale. There is continued collaboration with stakeholders including energy suppliers and the Data Communications Company to drive improvements in engagement, appointment fulfilment and the operation of meters, and ensuring technology roadmaps for the next decade are suitably developed and addressed. Driving good progress on an efficient transition from 2G/3G to 4G Communications Hubs (4G CHs) by 2033. Actively developing consultation proposals for the Regulatory Framework required for post 2025 to give investment clarity to industry. The size, scale and complexity of such an industry change programme with numerous energy sector stakeholders reflects why SMIP has remained with an AMBER rating.","startDate":"2009-12-02","endDate":"2030-12-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/12/2025 to 31/12/2030. This is primarily due to the following factors‚ SMIP’s current 4-year Regulatory Framework runs to the end of 2025 and the project end-date was set to mirror this timing. The existing Regulatory Framework sets minimum annual installation targets for energy suppliers and continues to drive suppliers to invest appropriately to deliver new installations at scale. We are actively developing consultation proposals for the Regulatory Framework required for post 2025 to give investment clarity to industry and support the Government’s 2030 Clean Power mission – the project end-date has been updated to reflect this.","fyBaseline":1320.98,"fyForecast":1320.98,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%. The budget variance is less than or equal to 5%.","wholeLifeCost":20177.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 20177. This is primarily due to the following factors‚ The total whole life cost figures in this return are presented in undiscounted nominal terms, for comparability with other programmes. The figure differs from the total cost figure in the Smart Metering Implementation Programme’s 2019 CBA, which is expressed in 2011 prices discounted to 2019 in line with HM Treasury appraisal guidance. This reflects the latest economic appraisal of the costs (and benefits) of the programme, including (but not limited to) costs from new assets and installation, setting up new communications infrastructure, and benefits including (but not limited to) reduced energy consumption, reduced greenhouse gas emissions, reduced site visits by suppliers, improved network management, and improved customer switching.","benefits":34130.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 34130. This is primarily due to the following factors‚ The total whole life benefits figures in this return are presented in undiscounted nominal terms, for comparability with other programmes. The figure differs from the total benefit figure in the Smart Metering Implementation Programme’s 2019 CBA, which is expressed in 2011 prices discounted to 2019 in line with HM Treasury appraisal guidance. This reflects the latest economic appraisal of the benefits (and costs) of the programme, including (but not limited to) costs from new assets and installation, setting up new communications infrastructure, and benefits including (but not limited to) reduced energy consumption, reduced greenhouse gas emissions, reduced site visits by suppliers, improved network management, and improved customer switching.","themes":["Cost & funding","Delivery & schedule","Technical & integration"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Smart metering continues to deliver benefits to consumers, such as engagement on energy consumption, accurate energy bills and improved customer service, and is key…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":0,"attentionScore":18,"attentionReasons":["Current published delivery confidence is Amber"]},{"id":"BEIS_0153_2223-Q2","year":2026,"name":"Spherical Tokamak for Energy Production","department":"DESNZ","category":"Infrastructure and Construction","description":"The STEP (Spherical Tokamak for Energy Production) Programme is the UK Government’s flagship mission to design, demonstrate and de‑risk a prototype fusion power plant, while creating the industrial, commercial and regulatory foundations of a future UK fusion energy sector. STEP is therefore not just an infrastructure project. It is a national capability‑building programme, with delivery of a prototype plant at West Burton by the 2040s acting as the anchor for wider economic, technological and industrial outcomes.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Delivery Confidence Has remained Amber. This reflects sustained progress across design maturity, technology demonstration, commercial integration and site enablement, balanced against the inherent uncertainty and complexity of delivering a first‑of‑a‑kind fusion programme. While key technical risks remain these are well understood, actively managed, and supported by improving delivery capability, governance and industrial engagement.","startDate":"2018-07-16","endDate":"2045-04-01","scheduleNarrative":"The project’s end‑date has remained unchanged. This reflects a deliberate decision to maintain the overall schedule while incorporating increased technical maturity achieved through successive design baselines, early Tranche 2a delivery, and strengthened delivery integration. Key enabling activities—including site acquisition progress, Construction Partner onboarding, and clearer understanding of critical technical risks—have improved schedule confidence without requiring changes to the headline end‑date. We expect to provide indicative ranges for the end date Q3 FY26/27.","fyBaseline":102.48,"fyForecast":103.13,"fyVariance":0.63,"varianceNarrative":"The programme delivered a 1% underspend against the Control Total, closely aligned to the late‑period forecast and demonstrating strong financial control. Variances largely reflect the planned crystallisation of known delivery risks rather than new in‑year pressures, with year‑end performance supported by active financial management and improved accruals, and no material impact anticipated into the following year.","wholeLifeCost":null,"costNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","benefits":null,"benefitsNarrative":"Exempt under Section 22 - Information intended for future publication","themes":["Delivery & schedule","Technical & integration","Cost & funding","Scope & requirements"],"evidenceExcerpt":"Delivery Confidence Has remained Amber. This reflects sustained progress across design maturity, technology demonstration, commercial integration and site enablement, balanced against the inherent uncertainty and complexity of delivering a first‑of‑a‑kind fusion programme. While key technical risks remain these are well understood, actively managed, and…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"BEIS_0153_2223-Q2","year":2023,"name":"Spherical Tokamak for Energy Production","department":"DESNZ","category":"Infrastructure and Construction","description":"Spherical Tokamak for Energy Production (STEP) is a staged programme to design and build, by 2040, a prototype fusion energy plant capable of delivering net-energy to the grid. STEP will demonstrate the technical and commercial viability of fusion, through a design that would be cheaper than other approaches to fusion and through developing a supply chain for this embryonic technology. This will extend the existing UK lead in this field, and place the UK in pole position to design, manufacture and export the first fleet of low-carbon fusion energy plants into an international clean energy market potentially worth Tns p.a.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 is Amber. This is primarily due to the following factors. IPA gate 0/2 review completed 24/03. Delivery Confidence Assessment - Amber with 12 recommendations.Action plan put in place to support Outline Business Case with second IPA review to be conducted in June ahead of Business case Review in July.The scale of ambition, and risk for Tranche 2 is large. Key areas to address to support this level of ambition were identified by IPA as:-Increase fidelity of reporting to understand progress to plan and risk impacts.-Implementation of Review, Check, Assure to enable agile response to emerging information.-Increase in capability commensurate with the increasing scale of the programme going into Tranche 2.-Increased clarity on cross government sponsorship responsibilities.","startDate":"2018-07-16","endDate":"2024-03-31","scheduleNarrative":"The project's end-date at 22/23-Q4 is 2024-03-31. This is primarily due to the following factors. STEP Tranche 1 completes 31/03/2024, in line with original business case and following completion of deliverables identified in original business case. Business Case process is in train to authorise STEP Tranche 2a activity developing the programme out to 2028.","fyBaseline":66.19,"fyForecast":70.94,"fyVariance":7.0,"varianceNarrative":"Underspend in previous financial years was reallocated in last spending review. Variance is against original business case spend profile. Current forecast including this variance is within the overall envelop of the original business case.","wholeLifeCost":218.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 22/23-Q4 is 218m. This is primarily due to the following factors. This is the first Annual Reporting for the Programme. The STEP concept design business case allocated 217.6m for this concept phase. The programme is currently forecasting 217.6m against the scope of the original business case.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. The project did not provide departmental-agree monetised benefits at 22/23-Q4.","themes":["Approvals & decisions","Governance & assurance","Cost & funding","Delivery & schedule"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 is Amber. This is primarily due to the following factors. IPA gate 0/2 review completed 24/03. Delivery Confidence Assessment - Amber with 12 recommendations.Action plan put in place to support Outline Business Case with second IPA review to be conducted in June ahead…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"BEIS_0153_2223-Q2","year":2024,"name":"Spherical Tokamak for Energy Production","department":"DESNZ","category":"Infrastructure and Construction","description":"Spherical Tokamak for Energy Production (STEP) is a staged programme to design and build, targetting 2040, a prototype fusion energy plant capable of delivering net-energy and, through that, developing a UK fusion supply chain. STEP will demonstrate the technical and commercial viability of fusion through a design that would be cheaper than other approaches to fusion and through developing a supply chain for this embryonic technology. This will extend the existing UK lead in this field, placing the UK in the international lead of design and manufacture of fusion plant and systems, supporting a global fusion market worth Tns.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. This reflects the intrinsically high ambition and accepted risk of STEP in driving a new strategic technology with potentially global benefits, balanced with good early progress but increasing delivery challenging over time. IPA gate 0/2 review completed 24/03. Delivery Confidence Assessment - Amber with 12 recommendations. Action plan put in place to support Outline Business Case with second IPA review was conducted in June ahead of Business case Review in July. The Delivery confidence Assessment was retained as Amber with 7 of the 12 recommendations from March closed and 5 acknowledged as 'In-Progress'. Outline Business Case was approved Aug 23 and Full Business Case will be submitted autumn 24. Key areas to address to support this level of ambition were identified by IPA as: -Increase fidelity of reporting to understand progress to plan and risk impacts (on track - new reporting in place through Programme Board). -Implementation of Review, Check, Assure to enable agile response to emerging information (on track) -Increase in capability commensurate with the increasing scale of the programme going into Tranche 2 (on track; new delivery body - UKIFS - planned to assume programme control from Nov 24) -Increased clarity on cross government sponsorship responsibilities (addressed via DESNZ sponsorship and new Fusion Strategy Delivery Board)","startDate":"2018-07-16","endDate":"2045-04-01","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 increased from 2024-03-31 to 2045-04-01. This is primarily due to the following factors. This Project End date relates to the full programme rather than the current approved Phase. Year 2045, is an early estimate of the Spherical Tokamak plant's handover date to ongoing operations and will be revised as the programme plan is matured. The baseline date was erroneously referring to Tranche 1 completion of March 2024. Tranche 1 is now completed on time.","fyBaseline":51.84,"fyForecast":70.22,"fyVariance":35.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. Underspend in previous financial years was reallocated in last spending review. Variance is against original business case spend profile. In year spend including this variance is within the overall envelope of the original business case.","wholeLifeCost":238.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 increased from 218m. to 238m. This is primarily due to the following factors. The change in budgeted cost is due additional 20m funding approved in March 2023 for Tranche 1.","benefits":0.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 0m. Benefit will be identified as part of Tranche 2A which starts in FY 25-26","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. This reflects the intrinsically high ambition and accepted risk of STEP in driving a new strategic technology with potentially global benefits, balanced with good…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"BEIS_0153_2223-Q2","year":2025,"name":"Spherical Tokamak for Energy Production","department":"DESNZ","category":"Infrastructure and Construction","description":"The first of its kind, STEP is the UK's major technology and infrastructure programme to build a prototype fusion powerplant and, through that, to build a new industrial sector in which the UK will play a leading global role as fusion energy becomes a commercial reality. STEP is industrial strategy in action, generating short, medium, and longer-term economic growth and local social benefits in and around the site in north Nottinghamshire. The physical plant will demonstrate net energy, fuel self sufficiency and a viable route to plant maintenance. This will pave the way for the potential development of a fleet of future fusion powerplants around the world and the commercialisation of fusion energy, but the lasting legacy and the source of near-term value for the UK is stimulation of a supply chain that can support multiple fusion programmes worldwide as that industry grows, and that delivers additional benefit through spin-off technologies.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The intrinsic challenges of developing novel technologies and building a new industrial sector create delivery risks that could impact timelines, cost, and stakeholder confidence.","startDate":"2018-07-16","endDate":null,"scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 01/04/2045. This is primarily due to the following factors‚ the intrinsic challenges of developing novel technologies and building a new industrial sector create delivery risks that could impact timelines.","fyBaseline":67.4,"fyForecast":67.23,"fyVariance":0.25,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":null,"costNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","benefits":null,"benefitsNarrative":"Section 22 - Information intended for future publication","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The intrinsic challenges of developing novel technologies and building a new industrial sector create delivery risks that could impact timelines, cost, and…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"BEIS_0153_2223-Q2","year":2026,"name":"Spherical Tokamak for Energy Production","department":"DESNZ","category":"Infrastructure and Construction","description":"The STEP (Spherical Tokamak for Energy Production) Programme is the UK Government’s flagship mission to design, demonstrate and de‑risk a prototype fusion power plant, while creating the industrial, commercial and regulatory foundations of a future UK fusion energy sector. STEP is therefore not just an infrastructure project. It is a national capability‑building programme, with delivery of a prototype plant at West Burton by the 2040s acting as the anchor for wider economic, technological and industrial outcomes.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Delivery Confidence Has remained Amber. This reflects sustained progress across design maturity, technology demonstration, commercial integration and site enablement, balanced against the inherent uncertainty and complexity of delivering a first‑of‑a‑kind fusion programme. While key technical risks remain these are well understood, actively managed, and supported by improving delivery capability, governance and industrial engagement.","startDate":"2018-07-16","endDate":"2045-04-01","scheduleNarrative":"The project’s end‑date has remained unchanged. This reflects a deliberate decision to maintain the overall schedule while incorporating increased technical maturity achieved through successive design baselines, early Tranche 2a delivery, and strengthened delivery integration. Key enabling activities—including site acquisition progress, Construction Partner onboarding, and clearer understanding of critical technical risks—have improved schedule confidence without requiring changes to the headline end‑date. We expect to provide indicative ranges for the end date Q3 FY26/27.","fyBaseline":102.48,"fyForecast":103.13,"fyVariance":0.63,"varianceNarrative":"The programme delivered a 1% underspend against the Control Total, closely aligned to the late‑period forecast and demonstrating strong financial control. Variances largely reflect the planned crystallisation of known delivery risks rather than new in‑year pressures, with year‑end performance supported by active financial management and improved accruals, and no material impact anticipated into the following year.","wholeLifeCost":null,"costNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","benefits":null,"benefitsNarrative":"Exempt under Section 22 - Information intended for future publication","themes":["Delivery & schedule","Technical & integration","Cost & funding","Scope & requirements"],"evidenceExcerpt":"Delivery Confidence Has remained Amber. This reflects sustained progress across design maturity, technology demonstration, commercial integration and site enablement, balanced against the inherent uncertainty and complexity of delivering a first‑of‑a‑kind fusion programme. While key technical risks remain these are well understood, actively managed, and…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"BEIS_0153_2223-Q2","year":2025,"name":"Spherical Tokamak for Energy Production","department":"DESNZ","category":"Infrastructure and Construction","description":"The first of its kind, STEP is the UK's major technology and infrastructure programme to build a prototype fusion powerplant and, through that, to build a new industrial sector in which the UK will play a leading global role as fusion energy becomes a commercial reality. STEP is industrial strategy in action, generating short, medium, and longer-term economic growth and local social benefits in and around the site in north Nottinghamshire. The physical plant will demonstrate net energy, fuel self sufficiency and a viable route to plant maintenance. This will pave the way for the potential development of a fleet of future fusion powerplants around the world and the commercialisation of fusion energy, but the lasting legacy and the source of near-term value for the UK is stimulation of a supply chain that can support multiple fusion programmes worldwide as that industry grows, and that delivers additional benefit through spin-off technologies.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The intrinsic challenges of developing novel technologies and building a new industrial sector create delivery risks that could impact timelines, cost, and stakeholder confidence.","startDate":"2018-07-16","endDate":null,"scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 01/04/2045. This is primarily due to the following factors‚ the intrinsic challenges of developing novel technologies and building a new industrial sector create delivery risks that could impact timelines.","fyBaseline":67.4,"fyForecast":67.23,"fyVariance":0.25,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":null,"costNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","benefits":null,"benefitsNarrative":"Section 22 - Information intended for future publication","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The intrinsic challenges of developing novel technologies and building a new industrial sector create delivery risks that could impact timelines, cost, and…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":null,"attentionScore":18,"attentionReasons":["Current published delivery confidence is Amber"]},{"id":"DBT_0296_2526-Q2","year":2026,"name":"Strategic Sites Accelerator (SSA)","department":"DBT","category":"Infrastructure and Construction","description":"The Strategic Sites Accelerator is a key Industrial Strategy programme designed to unlock nationally significant investment opportunities and accelerate their path to delivery. Over the pilot period, we will support a small number of genuinely transformative sites, combining technical expertise with flexible financial tools to help crowd in private capital and unlock investment at pace. Backed by around £600 million of Financial Transactions funding, the Programme is focused on deploying capital where government intervention can be catalytic and help unlock opportunities that may not otherwise progress. The Programme is designed to tackle barriers that can slow down investment, helping strategic sites become investment-ready more quickly.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Delivery Confidence Asssessment rating remains AMBER. Independent assurance concluded that the programme is well developed, with a clear strategic rationale, commercial model and delivery approach. While the programme is progressing well, it remains subject to final HM Treasury approval and has not yet been fully mobilised, meaning some delivery arrangements are still being finalised.","startDate":null,"endDate":null,"scheduleNarrative":"Schedule remains the same.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide costs/schedule information","wholeLifeCost":null,"costNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","benefits":null,"benefitsNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","themes":["Delivery & schedule","Approvals & decisions","Commercial & supply chain","Cost & funding"],"evidenceExcerpt":"The Delivery Confidence Asssessment rating remains AMBER. Independent assurance concluded that the programme is well developed, with a clear strategic rationale, commercial model and delivery approach. While the programme is progressing well, it remains subject to final HM Treasury approval and has not yet been fully mobilised, meaning some delivery…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"DBT_0296_2526-Q2","year":2026,"name":"Strategic Sites Accelerator (SSA)","department":"DBT","category":"Infrastructure and Construction","description":"The Strategic Sites Accelerator is a key Industrial Strategy programme designed to unlock nationally significant investment opportunities and accelerate their path to delivery. Over the pilot period, we will support a small number of genuinely transformative sites, combining technical expertise with flexible financial tools to help crowd in private capital and unlock investment at pace. Backed by around £600 million of Financial Transactions funding, the Programme is focused on deploying capital where government intervention can be catalytic and help unlock opportunities that may not otherwise progress. The Programme is designed to tackle barriers that can slow down investment, helping strategic sites become investment-ready more quickly.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Delivery Confidence Asssessment rating remains AMBER. Independent assurance concluded that the programme is well developed, with a clear strategic rationale, commercial model and delivery approach. While the programme is progressing well, it remains subject to final HM Treasury approval and has not yet been fully mobilised, meaning some delivery arrangements are still being finalised.","startDate":null,"endDate":null,"scheduleNarrative":"Schedule remains the same.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide costs/schedule information","wholeLifeCost":null,"costNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","benefits":null,"benefitsNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","themes":["Delivery & schedule","Approvals & decisions","Commercial & supply chain","Cost & funding"],"evidenceExcerpt":"The Delivery Confidence Asssessment rating remains AMBER. Independent assurance concluded that the programme is well developed, with a clear strategic rationale, commercial model and delivery approach. While the programme is progressing well, it remains subject to final HM Treasury approval and has not yet been fully mobilised, meaning some delivery…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":null,"ratingDelta":null,"transition":"Not comparable","endDateDeltaDays":null,"attentionScore":18,"attentionReasons":["Current published delivery confidence is Amber"]},{"id":"DEFRA_0190_2223-Q3","year":2026,"name":"TERRESTRIAL NATURAL CAPITAL ECOSYSTEM ASSESSMENT","department":"DEFRA","category":"Government Transformation and Service Delivery","description":"Defra is developing a collaborative programme to enhance national and local insight into biodiversity, ecosystems, and natural capital assets. This initiative aims to support key environmental policies, including the Environmental Improvement Plan Targets, Environmental Land Management Schemes, and Biodiversity Net Gain. By addressing gaps in existing data and integrating a more comprehensive understanding of ecosystem conditions, the programme will ensure natural capital is fully considered in future decision-making. It aligns with the government's ambitious commitments to environmental protection, both internationally through the Convention on Biodiversity and domestically via the 25 Year Environment Plan.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors‚ confidence has strengthened following the successful publication of the first Analysis Ready Datasets (ARD) in December 2025, demonstrating the programme’s ability to deliver against commitments. This further stems from Defra’s Investment Committee approving the Full Business Case, confirming spend to deliver the NCEA programme through to closure at end 2028/29.However, overall confidence is driven by two key risks: (1) availability of prepared/processed data at the required cadence, and (2) consistency of data quality and assurance across partners. This quarter the programme has been focused on embedding lessons from the first ARD batch to improve predictability. Planning for FY 2026/27 is progressing, including agreement of a quarterly batching plan to provide earliest possible access for internal and external users.","startDate":"2021-04-01","endDate":"2029-03-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same as last year's published end-date for March 2029. This is primarily due to the following factors, the NCEA programme was designed around a 5-year strategic sample to measure environmental condition at a national and regional scale for England’s terrestrial and freshwater landscape. To deliver this the programme needs to run for seven years, the first year focused on setting up the environmental monitoring capability, five years to the field surveys that contribute to the strategic sample and a final year to complete the analysis and publication of the data, produce the Baseline Assessment of Natural Capital and Ecosystems and to undertake programme closure activity.","fyBaseline":61.55,"fyForecast":60.63,"fyVariance":1.5,"varianceNarrative":"The budget variance is -1.6% meaning the programme spent 98.4% of the baseline budget. The small variance is a result of the novel and uncertain nature of Research and Development work resulting in some work across several work packages not being completed in-year as well as some work slipping into the next financial year.”","wholeLifeCost":325.68,"costNarrative":"Compared to financial year 24/25-Q4, the projects departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) decreased from £331m to £328m. The decrease to the departmentally agreed WLC is as a result of certainty around our future year budgets following spending review and business planning exercises in FY25/26. The Programmes final business case covering spend from FY26/27 to FY28/29 was approved by Defra Investment Committee in March 2026 which covers the final two years of our fieldwork and the programmes final year. FY28/29 is needed to complete the lab analyses of the samples, quality assurance and publication of all of the data collected by the programme via Open Government Licence, and publication of the Baseline Assessment of Natural Capital and Ecoystems, that will bring together all the knowledge and information generated by the programme in an overall assessment for England.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 remained at 0. This is primarily due to the following factors‚ NCEA programme produces long-term and wide reaching benefits which extend beyond the reach and lifetime of the programme, making accurate measurement and reporting of monetary benefits unrealistic. The programme will report on non-monetary benefits annually at minimum. The Full Programme Business Case approved by Investment Committee in March 2026, confirms the Programme does not deliver any monetised benefits.","themes":["Cost & funding","Governance & assurance","Technical & integration","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors‚ confidence has strengthened following the successful publication of the first Analysis Ready Datasets (ARD) in December 2025, demonstrating the programme’s ability to deliver against…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"DEFRA_0190_2223-Q3","year":2023,"name":"Terrestrial Natural Capital Ecosystem Assessment","department":"DEFRA","category":"Government Transformation and Service Delivery","description":"The TNCEA programme establishes the first comprehensive understanding of the condition of natural capital assets across England drawn upon measurements data captured in the field. It puts in place sustainable capabilities to maintain and refresh the data baseline to keep it current in informing and supporting delivery of the 25YEP and related initiatives. The programme takes Defra's progress further towards becoming a data-driven, evidence-based organisation. The programme also incorporates development of systems modelling approaches in order to gain greater understanding of the complex relationships within the captured data, enabling it to be exploited for greater utility by customers for the data. The data generated will be used by a wide-range of stakeholder communities, including; core Defra and its Arms Length Bodies (ALBs), other Government departments, local government, national parks and authorities, utility providers and regulators, NGOs (local and national), private sector companies and academia.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 is Amber. This is primarily due to the following factors. Delivery confidence is currently Amber as we have set up almost all the governance infrastructure within the Programme and we have Programme Business Case approval from Investment Committee. Our Future Delivery Confidence is at Green/Amber as we are in the process of standing up all outstanding Governance Structures, completing the Benefits Plan and are currently filling critical FTE within the Programme.","startDate":"2021-04-01","endDate":"2025-04-01","scheduleNarrative":"The project's end-date at 22/23-Q4 is 2025-04-01. This is primarily due to the following factors. The Project end date is 31/3/25 and is based on the funding approved through the 2021 Spending Review, following a successful pilot funded through the 2020 Spending Review. The current programme will deliver national and some regional scale estimates of ecosystem and natural capital asset extent, location, and condition. To obtain the finer granularity that customers seek for their decisions and evaluations, additional capital funding will be required to extend the programme for 3 years. Stopping at the end of the FY 24/25 would leave additional benefits unrealised. Hence, we are working with partners and stakeholders to identify potential sources of funding for this.","fyBaseline":23.28,"fyForecast":26.2,"fyVariance":13.0,"varianceNarrative":"The programme was unable to spend its full allocation of funding for 22/23 as it took time longer than expected to staff the programme and to procure the services required. This was due in part due to recruitment restrictions introduced in 2022 and difficulties in getting projects through the commercial process in time. We have now recruited four commercial staff to focus on NCEA procurement and filled many of the vacant posts.","wholeLifeCost":125.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 22/23-Q4 is 125m. This is primarily due to the following factors. The programme has a range of controls and implementable measures to ensure expenditure does not exceed available funds, currently standing at 40.1m for FY 23/24 and 51.6m for FY24/25. Programme funding and costs for future years will be assessed on an annual basis. Where necessary, costs will be submitted as committed liabilities for future Spending Review assessments; for example, where costs are for the maintenance or infrastructure, or where they related to headcount cost.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. The project did not provide departmental-agree monetised benefits at 22/23-Q4.The project did not provide departmental-agree monetised benefits at 22/23-Q4.The project did not provide departmental-agree monetised benefits at 22/23-Q4. N/a - no monetised benefits","themes":["Cost & funding","Approvals & decisions","Governance & assurance","Commercial & supply chain"],"evidenceExcerpt":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 is Amber. This is primarily due to the following factors. Delivery confidence is currently Amber as we have set up almost all the governance infrastructure within the Programme and we have Programme Business Case approval from Investment Committee. Our Future Delivery…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"DEFRA_0190_2223-Q3","year":2024,"name":"Terrestrial Natural Capital Ecosystem Assessment","department":"DEFRA","category":"Government Transformation and Service Delivery","description":"The tNCEA programme delivers a nationwide survey of our terrestrial, freshwater and coastal environments, providing the location, extent and condition of all natural capital assets to the same timescale, the same quality and, where possible, the same spatial scale. Through comprehensive monitoring, innovative measurement and the development of tools and guidance, tNCEA will help deliver cross-government priorities, including: the 25 Year Environment Plan, Biodiversity Net Gain, Environmental Land Management schemes, Local Nature Recovery Schemes and Net Zero commitments. The programme also incorporates development of systems modelling approaches to efficiently and reliably quantify how assets and flows of natural capital inter-relate, depend on ecosystem health, and how that health is altered by pressures and interventions, and will transform decision making in England. The outputs will be used by a wide range of public and private sector organisations, including those interested in biodiversity, nature positive development, and green finance.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. This rating reflects that while the Programme has made good progress, including achieving a number of deliverables, embedding delivery and governance structures and taking steps to develop the digital infrastructure necessary to deliver datasets to customers there has been under delivery in some key areas. The Programme is actively managing all known challenges, and most are considered to be improving, and have shown no major cause for concern at this stage. Following the IPA Gate 0 review in September 2023, the programme was rated amber and we have taken positive measures to action the recommendations in their action plan and increase the likelihood of successful delivery.","startDate":"2021-04-01","endDate":"2025-04-01","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2025-04-01. This is primarily due to the following factors. The Programme end date is 31/03/2025 and is based on the SR-2021 funding settlement. The current programme will deliver national and some regional scale estimates of ecosystem and natural capital asset extent, location and condition. To obtain the finer granularity that customers seek for their decisions and evaluations, additional capital funding will be required to extend the programme for 3 years. Stopping at the end of the FY 24/25 would leave additional benefits unrealised. Hence, we are working with partners and stakeholders to prepare an SR-24 bid to enable the programme to continue for a further 3 years, and evaluate business-as-usual options post-2028.","fyBaseline":44.8,"fyForecast":36.76,"fyVariance":-18.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The HMT approved an allocation of 44.80 million. Defra's Investment Committee provided funding of 40.06 million. This reduces the budget variance to 8%. The variance was due to under delivery within the main collection projects, various unfilled vacancies and commercial delays across the year and slippage of work into 2024/25.","wholeLifeCost":125.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 remained at 125m. This is primarily due to the following factors. The programme's approved budget for 2024/25 is 56.86 million. 2024/25 work is planned on an over programmed approach equating to 3.75 million (60.61 million) above the 2024/25 budget. The programme has a range of implementable measures to control and monitor spend, and R&D programmes have a history of underspend across the Defra group. We are therefore confident expenditure will not exceed available funds.","benefits":0.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 0m. N/a - no monetised benefits","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. This rating reflects that while the Programme has made good progress, including achieving a number of deliverables, embedding delivery and governance structures and taking…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"DEFRA_0190_2223-Q3","year":2025,"name":"TERRESTRIAL NATURAL CAPITAL ECOSYSTEM ASSESSMENT","department":"DEFRA","category":"Government Transformation and Service Delivery","description":"Defra is developing a collaborative programme to enhance national and local insight into biodiversity, ecosystems, and natural capital assets. This initiative aims to support key environmental policies, including the Environmental Improvement Plan Targets, Environmental Land Management Schemes, and Biodiversity Net Gain. By addressing gaps in existing data and integrating a more comprehensive understanding of ecosystem conditions, the programme will ensure natural capital is fully considered in future decision-making. It aligns with the government's ambitious commitments to environmental protection, both internationally through the Convention on Biodiversity and domestically via the 25 Year Environment Plan.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the SRO Quarterly Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors The assessment rating reflects ongoing delivery challenges and areas requiring focused management across the programme. The primary concern remains the publication of Analysis Ready Data (ARD) for all elements of the strategic sample over the next year, and the successful integration of this data into Defra’s policy and decision-making processes. To mitigate data risks, a coordination group has been established with partners to drive the work on ARD requirements and data availability timelines. To support delivery, the programme has established a clear scope and structure for the 2025/26 funding allocation, consolidating delivery across work-strands and partners. This clarity has enabled the definition of firm milestones, strengthened data and digital components, and reinforced benefits realisation and policy alignment for each programme element. Progress has also been made in resolving issues related to the England Ecosystem Survey. Through a structured approach involving realistic and transparent performance reporting, forecasting, risk management, and sub-contracting, the programme has stabilised delivery. Initially managed through weekly meetings, this effort is now governed via monthly operational and quarterly strategic meetings with senior leadership, delivery partners, and contractors. Lessons learned from national delivery are being applied to support the Trees Outside Woodland strand, which remains off-track. Targeted interventions are underway to bring this element back on course. To move towards a green delivery confidence rating, the programme will deliver a comprehensive plan for the publication of 2025/26 ARD datasets, including clear timelines. It will also successfully launch the NCEA Digital Search Tool to provide streamlined access to outputs. In parallel, the programme will define and respond to specific customer requirements, ensuring maximum utility of NCEA products. Continued application of robust governance and delivery practices will help maintain momentum and address off-track elements.","startDate":"2021-04-01","endDate":null,"scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 01/04/2025 to 31/03/2029. This is primarily due to the following factors‚ The original end-date reflected the period for which the programme had secured funding through the 2021 Spending Review; it has now been updated to reflect funding through the 2025 Spending Review, which will take the programme through to closure . The NCEA programme was designed around a 5-year strategic sample to measure environmental condition at a national and regional scale for England’s terrestrial and freshwater landscape. To deliver this the programme needs to run for seven years, the first year focused on setting up the environmental monitoring capability, five years to the field surveys that contribute to the strategic sample and a final year to complete the analysis and publication of the data, produce the Baseline Assessment of Natural Capital and Ecosystems and to undertake programme closure activity.","fyBaseline":56.69,"fyForecast":55.44,"fyVariance":2.2,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":null,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 125 to 331. This is primarily due to the following factors‚ The Whole Life Costs now including the costs of the last three years of the strategic sample (25/26-27/28) and the final year (28/29) needed to complete the lab analyses of the samples, quality assurance and publication of all of the data collected by the programme via Open Government Licence, and publication of the Baseline Assessment of Natural Capital and Ecoystems, that will bring together all the knowledge and information generated by the programme in an overall assessment for England. Previous Whole Life Cost figures only included the funding secured through the 2021 Spending Review where as the revised Whole Life Costs include the additional four years through to programme closure.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ NCEA programme produces long-term and wide reaching benefits which extend beyond the reach and lifetime of the programme, making accurate measurement and reporting of monetary benefits unrealistic. The programme will report on non-monetary benefits annually at minimum. The 2025/26 Programme Business Case approved by Investment Committee in March 2025, confirms the Programme does not deliver any monetised benefits.","themes":["Cost & funding","Delivery & schedule","Technical & integration","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the SRO Quarterly Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors The assessment rating reflects ongoing delivery challenges and areas requiring focused management across the programme. The primary concern remains the publication of Analysis Ready Data…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"DEFRA_0190_2223-Q3","year":2026,"name":"TERRESTRIAL NATURAL CAPITAL ECOSYSTEM ASSESSMENT","department":"DEFRA","category":"Government Transformation and Service Delivery","description":"Defra is developing a collaborative programme to enhance national and local insight into biodiversity, ecosystems, and natural capital assets. This initiative aims to support key environmental policies, including the Environmental Improvement Plan Targets, Environmental Land Management Schemes, and Biodiversity Net Gain. By addressing gaps in existing data and integrating a more comprehensive understanding of ecosystem conditions, the programme will ensure natural capital is fully considered in future decision-making. It aligns with the government's ambitious commitments to environmental protection, both internationally through the Convention on Biodiversity and domestically via the 25 Year Environment Plan.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors‚ confidence has strengthened following the successful publication of the first Analysis Ready Datasets (ARD) in December 2025, demonstrating the programme’s ability to deliver against commitments. This further stems from Defra’s Investment Committee approving the Full Business Case, confirming spend to deliver the NCEA programme through to closure at end 2028/29.However, overall confidence is driven by two key risks: (1) availability of prepared/processed data at the required cadence, and (2) consistency of data quality and assurance across partners. This quarter the programme has been focused on embedding lessons from the first ARD batch to improve predictability. Planning for FY 2026/27 is progressing, including agreement of a quarterly batching plan to provide earliest possible access for internal and external users.","startDate":"2021-04-01","endDate":"2029-03-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same as last year's published end-date for March 2029. This is primarily due to the following factors, the NCEA programme was designed around a 5-year strategic sample to measure environmental condition at a national and regional scale for England’s terrestrial and freshwater landscape. To deliver this the programme needs to run for seven years, the first year focused on setting up the environmental monitoring capability, five years to the field surveys that contribute to the strategic sample and a final year to complete the analysis and publication of the data, produce the Baseline Assessment of Natural Capital and Ecosystems and to undertake programme closure activity.","fyBaseline":61.55,"fyForecast":60.63,"fyVariance":1.5,"varianceNarrative":"The budget variance is -1.6% meaning the programme spent 98.4% of the baseline budget. The small variance is a result of the novel and uncertain nature of Research and Development work resulting in some work across several work packages not being completed in-year as well as some work slipping into the next financial year.”","wholeLifeCost":325.68,"costNarrative":"Compared to financial year 24/25-Q4, the projects departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) decreased from £331m to £328m. The decrease to the departmentally agreed WLC is as a result of certainty around our future year budgets following spending review and business planning exercises in FY25/26. The Programmes final business case covering spend from FY26/27 to FY28/29 was approved by Defra Investment Committee in March 2026 which covers the final two years of our fieldwork and the programmes final year. FY28/29 is needed to complete the lab analyses of the samples, quality assurance and publication of all of the data collected by the programme via Open Government Licence, and publication of the Baseline Assessment of Natural Capital and Ecoystems, that will bring together all the knowledge and information generated by the programme in an overall assessment for England.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 remained at 0. This is primarily due to the following factors‚ NCEA programme produces long-term and wide reaching benefits which extend beyond the reach and lifetime of the programme, making accurate measurement and reporting of monetary benefits unrealistic. The programme will report on non-monetary benefits annually at minimum. The Full Programme Business Case approved by Investment Committee in March 2026, confirms the Programme does not deliver any monetised benefits.","themes":["Cost & funding","Governance & assurance","Technical & integration","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors‚ confidence has strengthened following the successful publication of the first Analysis Ready Datasets (ARD) in December 2025, demonstrating the programme’s ability to deliver against…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"DEFRA_0190_2223-Q3","year":2025,"name":"TERRESTRIAL NATURAL CAPITAL ECOSYSTEM ASSESSMENT","department":"DEFRA","category":"Government Transformation and Service Delivery","description":"Defra is developing a collaborative programme to enhance national and local insight into biodiversity, ecosystems, and natural capital assets. This initiative aims to support key environmental policies, including the Environmental Improvement Plan Targets, Environmental Land Management Schemes, and Biodiversity Net Gain. By addressing gaps in existing data and integrating a more comprehensive understanding of ecosystem conditions, the programme will ensure natural capital is fully considered in future decision-making. It aligns with the government's ambitious commitments to environmental protection, both internationally through the Convention on Biodiversity and domestically via the 25 Year Environment Plan.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the SRO Quarterly Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors The assessment rating reflects ongoing delivery challenges and areas requiring focused management across the programme. The primary concern remains the publication of Analysis Ready Data (ARD) for all elements of the strategic sample over the next year, and the successful integration of this data into Defra’s policy and decision-making processes. To mitigate data risks, a coordination group has been established with partners to drive the work on ARD requirements and data availability timelines. To support delivery, the programme has established a clear scope and structure for the 2025/26 funding allocation, consolidating delivery across work-strands and partners. This clarity has enabled the definition of firm milestones, strengthened data and digital components, and reinforced benefits realisation and policy alignment for each programme element. Progress has also been made in resolving issues related to the England Ecosystem Survey. Through a structured approach involving realistic and transparent performance reporting, forecasting, risk management, and sub-contracting, the programme has stabilised delivery. Initially managed through weekly meetings, this effort is now governed via monthly operational and quarterly strategic meetings with senior leadership, delivery partners, and contractors. Lessons learned from national delivery are being applied to support the Trees Outside Woodland strand, which remains off-track. Targeted interventions are underway to bring this element back on course. To move towards a green delivery confidence rating, the programme will deliver a comprehensive plan for the publication of 2025/26 ARD datasets, including clear timelines. It will also successfully launch the NCEA Digital Search Tool to provide streamlined access to outputs. In parallel, the programme will define and respond to specific customer requirements, ensuring maximum utility of NCEA products. Continued application of robust governance and delivery practices will help maintain momentum and address off-track elements.","startDate":"2021-04-01","endDate":null,"scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 01/04/2025 to 31/03/2029. This is primarily due to the following factors‚ The original end-date reflected the period for which the programme had secured funding through the 2021 Spending Review; it has now been updated to reflect funding through the 2025 Spending Review, which will take the programme through to closure . The NCEA programme was designed around a 5-year strategic sample to measure environmental condition at a national and regional scale for England’s terrestrial and freshwater landscape. To deliver this the programme needs to run for seven years, the first year focused on setting up the environmental monitoring capability, five years to the field surveys that contribute to the strategic sample and a final year to complete the analysis and publication of the data, produce the Baseline Assessment of Natural Capital and Ecosystems and to undertake programme closure activity.","fyBaseline":56.69,"fyForecast":55.44,"fyVariance":2.2,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":null,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 125 to 331. This is primarily due to the following factors‚ The Whole Life Costs now including the costs of the last three years of the strategic sample (25/26-27/28) and the final year (28/29) needed to complete the lab analyses of the samples, quality assurance and publication of all of the data collected by the programme via Open Government Licence, and publication of the Baseline Assessment of Natural Capital and Ecoystems, that will bring together all the knowledge and information generated by the programme in an overall assessment for England. Previous Whole Life Cost figures only included the funding secured through the 2021 Spending Review where as the revised Whole Life Costs include the additional four years through to programme closure.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ NCEA programme produces long-term and wide reaching benefits which extend beyond the reach and lifetime of the programme, making accurate measurement and reporting of monetary benefits unrealistic. The programme will report on non-monetary benefits annually at minimum. The 2025/26 Programme Business Case approved by Investment Committee in March 2025, confirms the Programme does not deliver any monetised benefits.","themes":["Cost & funding","Delivery & schedule","Technical & integration","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the SRO Quarterly Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors The assessment rating reflects ongoing delivery challenges and areas requiring focused management across the programme. The primary concern remains the publication of Analysis Ready Data…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":null,"attentionScore":18,"attentionReasons":["Current published delivery confidence is Amber"]},{"id":"DFT_0037_1920-Q3","year":2026,"name":"TRANSPENNINE ROUTE UPGRADE","department":"DFT","category":"Infrastructure and Construction","description":"The Transpennine Route Upgrade (TRU) is a large-scale upgrade of the railway between Manchester, Leeds and York and will provide more capacity, and faster, more reliable, greener journeys. We are investing £11bn in TRU, £7.3bn of which has already been committed. This is the largest rail investment in the north of England and the second biggest nationally after HS2. TRU is well underway and delivering successfully to time and budget. A rolling programme of upgrades will deliver benefits incrementally over the next decade with some being delivered now. It will support passengers by electrifying the 70-mile route, addressing pinch points, remodelling stations, adopting digital signalling and introducing new trains. This will facilitate the introduction of a new, enhanced timetable for passengers, delivering more reliable and quicker journeys between key cities. TRU is developing options to benefit freight by facilitating up to 15 freight paths (using the largest wagons available) in each direction per day across the north of England, the equivalent to removing 1,140 lorry movements a day. Such a modal shift from road freight to rail would ease congestion and reduce pollution.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 25/26-Q4 remained at AMBER. This is primarily due to continued strong programme performance and integration of programmes across the north of England. To date, £7.3bn has been committed to the upgrade, with the Prime Minister announcing in March 2025 an additional £415m to maintain programme delivery and support passengers to travel by rail whilst major works are taking place along the TRU route. Infrastructure delivery continues to be delivered to time and budget with electrification works on the line between York and Church Fenton completed in August 2025 enabling electric operations on 25% of the Transpennine route. Major works were commenced at Huddersfield station in September 2025 with new bridges and longer platforms delivered as well as a new train stabling facility at Hillhouse. Benefits delivery remains on schedule with the bulk of improvements being delivered by the end of the 2020s (when the line of route between Huddersfield and York will be fully upgraded) and the remainder by the mid-2030s (when digital signalling and the section of the route between Huddersfield and Stalybridge will complete). 95% of the programme is now in either the Design or Delivery phase with several significant blockades taking place in 2026 to renew track and install overhead electrification. Comprehensive customer handling plans are in place and routine assurance by DfT teams is carried out to test their suitability; to date disruption across the route continues to be handled well with high passenger satisfaction scores. TransPennine Trains' existing diesel-only fleet will also be replaced to maximise the new electrification capability. A procurement has been undertaken and a contract award is expected in summer 2026. A Cost Efficiency panel, chaired by DfT's Non-Executive Director to the programme, continues to oversee activities to deliver the identified cost efficiency targets. In February 2026 a new Shareholder Forum was established to enable the Accounting Officers within the Department for Transport and Network Rail to consider programme delivery and future challenges to benefits realisation.","startDate":"2017-07-01","endDate":"2041-10-17","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained at 17/10/2041 and was informed by a baselining exercise that aligned all Key Output realisation dates with Programme Business Case 2 (PBC2) commitments. The bulk of TRU's benefits will be delivered by the mid-2030s, with additional digital signalling capability becoming available by the early 2040s. The programme has a stable integrated schedule based on Baseline 2.1 agreed by Enterprise partners which maintains Key Output dates for KO1 to KO5b as agreed at PBC2, as well as the PBC2 funding position for all infrastructure sub-projects. Baseline 2.1 created a stable programme baseline position with a realistic and achievable critical path now committed to with both delivery Alliances as part of the W34 and E234 contract awards. It also forecasts P50 and P80 delivery dates and timelines for benefits delivery. The approval of the TOC-Business Case in March 2025, confirmed alignment of train-operator related delivery plans with Baseline 2.1. KO2 (electrification of services between Manchester Victoria and Stalybridge) was completed ahead of schedule at the end of 2024, and KO3 (electrification of TransPennine Services between York and Church Fenton)was delivered on time in summer 2025.","fyBaseline":1007.93,"fyForecast":1006.12,"fyVariance":0.18,"varianceNarrative":"The budget variance is less than or equal to 5%","wholeLifeCost":10658.6,"costNarrative":"The departmentally agreed Whole Life Cost at FY2025/26 Q4 increased from £11,056m to £11,199m. This is stated in nominal terms. This is primarily due to re-alignment of portfolio budgets with the current forecast as the previous budget position was not sufficient. The current forecast has changed marginally from £11,204m to £11,210m.","benefits":1754.86,"benefitsNarrative":"The departmentally agreed Benefits at FY2025/26 Q4 remains at £2,978m. This is stated in Present Value 2010 terms. The estimate continues to reflect the baseline set at Programme Business Case 2 (May 2023). This estimate is expected to be revised over the period to the next Annual Report, assuming the current draft Programme Business Case 3 is approved. This is not a significant update, and the scope and outputs of the programme remain stable.","themes":["Delivery & schedule","Cost & funding","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 25/26-Q4 remained at AMBER. This is primarily due to continued strong programme performance and integration of programmes across the north of England. To date, £7.3bn has been committed to the upgrade, with the Prime Minister announcing in…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"DFT_0037_1920-Q3","year":2021,"name":"Transpennine Route Upgrade","department":"DFT","category":"Infrastructure and Construction","description":"The TRU programme will deliver journey time improvements, additional services, increased passenger capacity, enhanced performance and reliability and improved environmental performance to the main rail link across the Pennines between Manchester and York via Huddersfield and Leeds.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber.This is primarily due to the following factors: The IPA Gateway 2 review was held in January 2021 and concluded an Amber rating, this indicates the programme is in a good place with no major obstacles to progress. Recommendations from the Gateway 2 review have been accepted and responses are being developed and implemented, alongside those received from other external assurance activities. The single biggest issue on the programme is the lack of an agreed end-state and evolving priorities and requirements. This needs to be resolved through a Programme Business Case alongside the Integrated Rail Plan for the North, which will enable leadership to stabilise the programme, and focus management attention onto efficient and effective delivery.","startDate":"2017-07-01","endDate":"2028-07-31","scheduleNarrative":"The project end-date is 31 July 2028. This is primarily due to the following factors: The Transpennine Route Upgrade is currently on track to deliver against its baseline schedule. At the next investment decision the project scope will be confirmed. If options for increased scope, enabling greater benefits, are selected the programme end date will extend to accommodate this.","fyBaseline":253.0,"fyForecast":239.0,"fyVariance":-6.0,"varianceNarrative":"The budget variance exceeds 5%. In-year spend forecast total is �14m less than baseline total (-6% variance) due to achieved efficiencies and delay in delivery of some scope.","wholeLifeCost":3506.0,"costNarrative":"The projects Baseline Whole Life Cost is �3506.00m. This is primarily due to the following factors: TRU has secured design funding through Outline Business Case (April 2020) for a scheme known as Option C (costs reported above). Additional funding was secured for development of two further options with increased scope. The choice between these, and the associated whole life project cost, will be informed by the outcome of the Integrated Rail Plan for the North and confirmed through a Programme Business Case this summer. NB: Programme GMPP baseline is �3.5-3.9bn for Option C in line with April 2020 Outline Business Case.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Scope & requirements"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber.This is primarily due to the following factors: The IPA Gateway 2 review was held in January 2021 and concluded an Amber rating, this indicates the programme is in a good place with no major obstacles to progress. Recommendations from the Gateway 2 review have been…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21"},{"id":"DFT_0037_1920-Q3","year":2022,"name":"Transpennine Route Upgrade","department":"DFT","category":"Infrastructure and Construction","description":"The TransPennine Route Upgrade (TRU) is a full \"route modernisation\" programme for the North TransPennine Route, the key East-West rail link across the North of England from Manchester to York, via Huddersfield and Leeds. It is expected to halve average delay minutes for fast services, provide an extra two train paths per hour, aim to reduce journey times from 55 to 41 minutes (reducing further to 33 minutes with NPR work about a decade later) from York to Manchester, and electrify the whole route for decarbonisation objectives and operational cost savings. The proposed scope for the programme includes early delivery of Northern Powerhouse Rail (NPR) infrastructure.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 remained at Amber. This is primarily due to the timing of publication of the proposals in the Integrated Rail Plan (IRP) which remained uncertain and were fundamental to confirm the final end state described in Option G (for programme elements transferred to Transpennine Route Upgrade from Northern Powerhouse Rail (NPR)). The IRP and Spending Review (SR) has now been resolved and the next Infrastructure and Projects Authority review will be late 2022.","startDate":"2017-07-01","endDate":"2041-10-17","scheduleNarrative":"Compared to 2021-Q4, your project end-date increased from 31 JUL 2028 to 17 OCT 2041 . This is primarily due to the following factors: The end-state delivery date was moved from 2028 to 2033 (P80 dates) due to the increase in the 'core' scope. At the time of the Programme Business Case in June 2021, the NPR enabling scope was added to the end of the programme, and this extended the completion date to 2041. The current assumption aligns the Project End Date with completion of GRIP 8 for all projects. However, Network Rail are working on better integration of NPR enabling scope with the 'core' scope and this should lead to an earlier delivery date. The revised delivery date will be included in the next Business Case iteration, in early 2023.","fyBaseline":450.0,"fyForecast":412.0,"fyVariance":-8.0,"varianceNarrative":"This is primarily due to an increase in design phase duration for Project W3, a delay in the commencement of NPR enabling works and legal issues in the digital programme.","wholeLifeCost":9185.0,"costNarrative":"Compared to2021-Q4, the projects Baseline Whole Life Cost increased from 3506.00 (£m) to 9185.00 (£m). This is primarily due to the following factors: The increase in scope which now includes digital signalling and full electrification. The £3.506bn figure was based on a previous option and included discontinuous electrification. The scope of the 'core' TRU package increased to £5.960bn in 2021, and this included full route electrification and partial digital signalling. Furthermore, in 2021, the scope was increased further to include the early facilitation of Northern Powerhouse Rail and enhanced freight capability. The cost range for Option F1 'core' TRU has remained stable, but the cost range for the wider NPR compatible Option G has increased in cost, reflecting the higher level of uncertainty. TRU's cost range for infrastructure is in the range £8,416m at P50 to £9,185m at P80.","benefits":null,"benefitsNarrative":"","themes":["Scope & requirements","Cost & funding","Delivery & schedule","Technical & integration"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 remained at Amber. This is primarily due to the timing of publication of the proposals in the Integrated Rail Plan (IRP) which remained uncertain and were fundamental to confirm the final end state described in Option G (for…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"DFT_0037_1920-Q3","year":2023,"name":"Transpennine Route Upgrade","department":"DFT","category":"Infrastructure and Construction","description":"TRU is a major multi-billion-pound programme of railway improvements between Manchester, Huddersfield, Leeds and York. TRU will bring passengers more frequent, faster, greener trains, running on a better, cleaner, and more reliable railway. TRU will transform East-West travel across the North of England.It will include full electrification of the route, additional tracks, new digital signalling, and more capability to allow greater freight use. It is a key commitment in the governments 96bn integrated rail plan, published last year, which confirmed support for the TRU Programme.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. This is primarily due to the timing of publication of the proposals in the Integrated Rail Plan (IRP) which remained uncertain and were fundamental to confirm the final end state described in Option G (for programme elements transferred to Transpennine Route Upgrade from Northern Powerhouse Rail (NPR)). The IRP and Spending Review (SR) has now been resolved and the next Infrastructure and Projects Authority review will be April 2023.","startDate":"2017-07-01","endDate":"2041-10-17","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2041-10-17. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2041-10-17. This is primarily due to the following factors. A rebaselined schedule will be provided as part of the PBC2 submission in Spring 2023.","fyBaseline":661.5,"fyForecast":590.0,"fyVariance":-11.0,"varianceNarrative":"The budget 612m budget set at SR21, since then the scope has matured significantly, and Northern Powerhouse Rail facilitation projects have been integrated. At the same time, significant efficiencies have been generated which have outpaced inflationary pressures to reduce overall project totals. The consequent resequencing and reforecasting of the project prior to its next major approval in 2023 has resulted in the variance shown.","wholeLifeCost":11453.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 increased from 9185m. to 11453m. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 increased from 9185m. to 11453m. This is primarily due to the following factors. There has been no cost increase in the programme: the variance relates to the way TRU has been recorded in the GMPP return. The 9,185m forecast excluded two significant cost groups. At PBC1, the forecast included 1,667m of risk provision based on Reference Class Forecasting which was not profiled and so not included in the 9,185m; and 602m of Operator Costs which were also not profiled in Q4 of 2021/22. We will be receiving an updated assured estimate from Network Rail and Train Operator delivery partners in the next few weeks and this should lead to an updated forecast at Q1 2023/24. The whole life costs are nominal inflated values (AFC), as presented in PBC1","benefits":3088.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 3088m. Benefits of the programme are wider public and economic benefits from faster and more reliable journeys, more journey opportunities and an improved environment from a shift of passenger and freight transport to rail, plus decarbonisation, including from electrification. The benefits are 2010 Present Values as presented in PBC1.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. This is primarily due to the timing of publication of the proposals in the Integrated Rail Plan (IRP) which remained uncertain and were fundamental to confirm the…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"DFT_0037_1920-Q3","year":2024,"name":"Transpennine Route Upgrade","department":"DFT","category":"Infrastructure and Construction","description":"TRU is a major multi-billion-pound programme of railway improvements between Manchester, Huddersfield, Leeds and York. TRU will bring passengers more frequent, faster, greener trains, running on a better, cleaner, and more reliable railway. TRU will transform East-West travel across the North of England.It will include full electrification of the route, additional tracks, new digital signalling, and more capability to allow greater freight use. To date, 6.9bn has been committed to the programme, against an Anticipated Final Cost of 10.4bn - 11.6bn.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The complexity of the regional timetable has the potential to place pressure on benefits. Timetable modelling due to conclude later this year expected to alleviate this. TRU is also dependent on adjacent projects in Manchester and Leeds to deliver its full benefits, but doesn't control their approvals and funding. Governance has been implemented to ensure regional integration.","startDate":"2017-07-01","endDate":"2041-10-17","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2041-10-17. This is primarily due to the following factors. TRU's Programme Business Case 2 (PBC2) funding approval was announced in December 2023. PBC2 has led to some replanning but with Entry into Service dates remaining as per the baseline (which will see full passenger benefit realisation by the mid 2030s). Negotiations between Network Rail and the supply chain to formally place into contract two of the largest sub-projects in the programme (W34 - Huddersfield to Leeds, and E234 - Church Fenton to Leeds) are on track to conclude by Summer 2024.","fyBaseline":647.56,"fyForecast":698.07,"fyVariance":8.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. Network Rail took the initiative to bring forward infrastructure spend previously forecast in future years to deliver it early. This is considered efficient, as it releases it from the forecast and therefore will not be subject to risk and inflation within the programme. A programme change control was approved by the Rail Network Enhancements Pipeline (RNEP) Portfolio Board.","wholeLifeCost":11104.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 decreased from 11453m. to 11104m. This is primarily due to the following factors. The previous 11.453bn figure was stated at TRU Programme Business Case Update 1 (May 2021). Since then, we have received approval for TRU Programme Business Case Update 2 (May 2023) - 11.183bn. In the intervening two years, the programme has experienced headwinds in project costs and has been re-stated using March 2023 OBR inflation forecasts, but offset by efficiencies totalling 1.6bn. The 11.103bn figure was set following at DfT Rail Network Enhancements Pipeline (RNEP) Portfolio Re-baselining exercise in the summer of 2023.","benefits":2978.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 2324-Q4 decreased from 3088m. to 2978m. Benefits of the programme are wider public and economic benefits from faster and more reliable journeys, more journey opportunities and an improved environment from a shift of passenger and freight transport to rail, plus decarbonisation, including from electrification.","themes":["Cost & funding","Approvals & decisions","Commercial & supply chain","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The complexity of the regional timetable has the potential to place pressure on benefits. Timetable modelling due to conclude later this year expected to alleviate…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"DFT_0037_1920-Q3","year":2025,"name":"TRANSPENNINE ROUTE UPGRADE","department":"DfT","category":"Infrastructure and Construction","description":"The Transpennine route upgrade (TRU) is a large-scale upgrade of the railway between Manchester, Leeds and York and will provide more capacity, and faster, more reliable, greener journeys. We are investing £11bn in TRU, £7.3bn of which has already been committed. This is the largest investment in the north of England and the second biggest nationally after HS2. TRU is well underway and delivering successfully to time and budget. A rolling programme of upgrades will deliver benefits incrementally over the next decade with some being delivered now. It will support passengers by electrifying the 70-mile route, addressing pinch points, remodelling stations, adopting digital signalling and introducing new trains. This will facilitate the introduction of a new, enhanced timetable for passengers, delivering more reliable and quicker journeys between key cities. TRU is developing options to benefit freight by facilitating up to 15 freight paths (using the largest wagons available) in each direction per day across the north of England, the equivalent to removing 1,140 lorry movements a day. If approved, this will ease congestion and reduce pollution.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to continued strong programme performance, integration of programmes across the north of England, and senior management turnover. To date, £7.3bn has been committed to the upgrade, with the Prime Minister announcing in March 2025 an additional £415m to maintain programme delivery and support passengers to travel by rail whilst major works are taking place along the TRU route. Infrastructure delivery continues to be delivered to time and budget with works completing at the end of 2024 between Manchester Victoria and Stalybridge, facilitating electric Northern and TransPennine services for the first time. Works to upgrade and electrify the line between York and Church Fenton have recently concluded and await ORR authorisation. This will enable electric TransPennine services to operate along this section of the route later in 2025. Benefits delivery remains on schedule with the bulk of improvements being delivered by the end of the 2020s (where the line of route between Huddersfield and York will be fully upgraded) and the remainder by the mid-2030s (where digital signalling and the section of the route between Huddersfield and Stalybridge will complete). 95% of the programme is now in either the Design or Delivery phase with several significant blockades taking place in 2025, most notably a 30-day closure of the railway at Huddersfield in August. Comprehensive customer handling plans are in place and routine assurance by DfT teams is carried out to test their suitability; to date disruption across the route continues to be handled well with high passenger satisfaction scores. TransPennine Trains' existing diesel-only fleet will also be replaced to maximise the new electrification capability. Whilst detailed discussions are taking place regarding their specification, procurement is progressing with a contract award expected in summer 2025. A Cost Efficiency panel, chaired by DfT's Non-Executive Director to the programme, has also been established to monitor progress towards securing additional efficiencies. In February 2025, a new Managing Director commenced in role, as well as a new permanent SRO, bringing stability to the programme's leadership.","startDate":"2017-07-01","endDate":"2041-10-17","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 17/10/2041. This is primarily due to a recent, successful re-baselining exercise that sees all Key Output realisation dates aligned with Programme Business Case 2 (PBC2) commitments. The bulk of TRU's benefits will be delivered by the mid-2030s, with additional digital signalling capability becoming available by the early 2040s. The programme has a stable integrated schedule that was recently updated. Baseline 2.1 was agreed last year between Enterprise partners and maintains Key Output dates for KO1 to KO5b as agreed at PBC2, as well as the PBC2 funding position for all infrastructure sub-projects. Baseline 2.1 creates a stable programme baseline position with a realistic and achievable critical path now committed to with both delivery Alliances as part of the W34 and E234 contract awards. It also forecasts P50 and P80 delivery dates and timelines for benefits delivery. The approval of the TOC-Business Case in March 2025, confirmed alignment of train-operator related delivery plans with Baseline 2.1. KO2 (electrification of services between Manchester Victoria and Stalybridge) was completed ahead of schedule at the end of 2024, and KO3 (electrification of TransPennine Services between York and Church Fenton) is on track to be delivered by summer 2025.","fyBaseline":848.82,"fyForecast":843.99,"fyVariance":0.57,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":11056.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 11104 to 11056. This is primarily due to the following factors‚ Adjustment to reflect change in budget post Spending Review Phase 1.","benefits":2978.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 2978. This is primarily due to the following factors‚ This is because we have not restated the benefits baseline since Programme Business Case 2 (May 2023).","themes":["Delivery & schedule","Cost & funding","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to continued strong programme performance, integration of programmes across the north of England, and senior management turnover. To date, £7.3bn has been committed to the upgrade, with the…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"DFT_0037_1920-Q3","year":2026,"name":"TRANSPENNINE ROUTE UPGRADE","department":"DFT","category":"Infrastructure and Construction","description":"The Transpennine Route Upgrade (TRU) is a large-scale upgrade of the railway between Manchester, Leeds and York and will provide more capacity, and faster, more reliable, greener journeys. We are investing £11bn in TRU, £7.3bn of which has already been committed. This is the largest rail investment in the north of England and the second biggest nationally after HS2. TRU is well underway and delivering successfully to time and budget. A rolling programme of upgrades will deliver benefits incrementally over the next decade with some being delivered now. It will support passengers by electrifying the 70-mile route, addressing pinch points, remodelling stations, adopting digital signalling and introducing new trains. This will facilitate the introduction of a new, enhanced timetable for passengers, delivering more reliable and quicker journeys between key cities. TRU is developing options to benefit freight by facilitating up to 15 freight paths (using the largest wagons available) in each direction per day across the north of England, the equivalent to removing 1,140 lorry movements a day. Such a modal shift from road freight to rail would ease congestion and reduce pollution.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 25/26-Q4 remained at AMBER. This is primarily due to continued strong programme performance and integration of programmes across the north of England. To date, £7.3bn has been committed to the upgrade, with the Prime Minister announcing in March 2025 an additional £415m to maintain programme delivery and support passengers to travel by rail whilst major works are taking place along the TRU route. Infrastructure delivery continues to be delivered to time and budget with electrification works on the line between York and Church Fenton completed in August 2025 enabling electric operations on 25% of the Transpennine route. Major works were commenced at Huddersfield station in September 2025 with new bridges and longer platforms delivered as well as a new train stabling facility at Hillhouse. Benefits delivery remains on schedule with the bulk of improvements being delivered by the end of the 2020s (when the line of route between Huddersfield and York will be fully upgraded) and the remainder by the mid-2030s (when digital signalling and the section of the route between Huddersfield and Stalybridge will complete). 95% of the programme is now in either the Design or Delivery phase with several significant blockades taking place in 2026 to renew track and install overhead electrification. Comprehensive customer handling plans are in place and routine assurance by DfT teams is carried out to test their suitability; to date disruption across the route continues to be handled well with high passenger satisfaction scores. TransPennine Trains' existing diesel-only fleet will also be replaced to maximise the new electrification capability. A procurement has been undertaken and a contract award is expected in summer 2026. A Cost Efficiency panel, chaired by DfT's Non-Executive Director to the programme, continues to oversee activities to deliver the identified cost efficiency targets. In February 2026 a new Shareholder Forum was established to enable the Accounting Officers within the Department for Transport and Network Rail to consider programme delivery and future challenges to benefits realisation.","startDate":"2017-07-01","endDate":"2041-10-17","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained at 17/10/2041 and was informed by a baselining exercise that aligned all Key Output realisation dates with Programme Business Case 2 (PBC2) commitments. The bulk of TRU's benefits will be delivered by the mid-2030s, with additional digital signalling capability becoming available by the early 2040s. The programme has a stable integrated schedule based on Baseline 2.1 agreed by Enterprise partners which maintains Key Output dates for KO1 to KO5b as agreed at PBC2, as well as the PBC2 funding position for all infrastructure sub-projects. Baseline 2.1 created a stable programme baseline position with a realistic and achievable critical path now committed to with both delivery Alliances as part of the W34 and E234 contract awards. It also forecasts P50 and P80 delivery dates and timelines for benefits delivery. The approval of the TOC-Business Case in March 2025, confirmed alignment of train-operator related delivery plans with Baseline 2.1. KO2 (electrification of services between Manchester Victoria and Stalybridge) was completed ahead of schedule at the end of 2024, and KO3 (electrification of TransPennine Services between York and Church Fenton)was delivered on time in summer 2025.","fyBaseline":1007.93,"fyForecast":1006.12,"fyVariance":0.18,"varianceNarrative":"The budget variance is less than or equal to 5%","wholeLifeCost":10658.6,"costNarrative":"The departmentally agreed Whole Life Cost at FY2025/26 Q4 increased from £11,056m to £11,199m. This is stated in nominal terms. This is primarily due to re-alignment of portfolio budgets with the current forecast as the previous budget position was not sufficient. The current forecast has changed marginally from £11,204m to £11,210m.","benefits":1754.86,"benefitsNarrative":"The departmentally agreed Benefits at FY2025/26 Q4 remains at £2,978m. This is stated in Present Value 2010 terms. The estimate continues to reflect the baseline set at Programme Business Case 2 (May 2023). This estimate is expected to be revised over the period to the next Annual Report, assuming the current draft Programme Business Case 3 is approved. This is not a significant update, and the scope and outputs of the programme remain stable.","themes":["Delivery & schedule","Cost & funding","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 25/26-Q4 remained at AMBER. This is primarily due to continued strong programme performance and integration of programmes across the north of England. To date, £7.3bn has been committed to the upgrade, with the Prime Minister announcing in…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"DFT_0037_1920-Q3","year":2025,"name":"TRANSPENNINE ROUTE UPGRADE","department":"DfT","category":"Infrastructure and Construction","description":"The Transpennine route upgrade (TRU) is a large-scale upgrade of the railway between Manchester, Leeds and York and will provide more capacity, and faster, more reliable, greener journeys. We are investing £11bn in TRU, £7.3bn of which has already been committed. This is the largest investment in the north of England and the second biggest nationally after HS2. TRU is well underway and delivering successfully to time and budget. A rolling programme of upgrades will deliver benefits incrementally over the next decade with some being delivered now. It will support passengers by electrifying the 70-mile route, addressing pinch points, remodelling stations, adopting digital signalling and introducing new trains. This will facilitate the introduction of a new, enhanced timetable for passengers, delivering more reliable and quicker journeys between key cities. TRU is developing options to benefit freight by facilitating up to 15 freight paths (using the largest wagons available) in each direction per day across the north of England, the equivalent to removing 1,140 lorry movements a day. If approved, this will ease congestion and reduce pollution.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to continued strong programme performance, integration of programmes across the north of England, and senior management turnover. To date, £7.3bn has been committed to the upgrade, with the Prime Minister announcing in March 2025 an additional £415m to maintain programme delivery and support passengers to travel by rail whilst major works are taking place along the TRU route. Infrastructure delivery continues to be delivered to time and budget with works completing at the end of 2024 between Manchester Victoria and Stalybridge, facilitating electric Northern and TransPennine services for the first time. Works to upgrade and electrify the line between York and Church Fenton have recently concluded and await ORR authorisation. This will enable electric TransPennine services to operate along this section of the route later in 2025. Benefits delivery remains on schedule with the bulk of improvements being delivered by the end of the 2020s (where the line of route between Huddersfield and York will be fully upgraded) and the remainder by the mid-2030s (where digital signalling and the section of the route between Huddersfield and Stalybridge will complete). 95% of the programme is now in either the Design or Delivery phase with several significant blockades taking place in 2025, most notably a 30-day closure of the railway at Huddersfield in August. Comprehensive customer handling plans are in place and routine assurance by DfT teams is carried out to test their suitability; to date disruption across the route continues to be handled well with high passenger satisfaction scores. TransPennine Trains' existing diesel-only fleet will also be replaced to maximise the new electrification capability. Whilst detailed discussions are taking place regarding their specification, procurement is progressing with a contract award expected in summer 2025. A Cost Efficiency panel, chaired by DfT's Non-Executive Director to the programme, has also been established to monitor progress towards securing additional efficiencies. In February 2025, a new Managing Director commenced in role, as well as a new permanent SRO, bringing stability to the programme's leadership.","startDate":"2017-07-01","endDate":"2041-10-17","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 17/10/2041. This is primarily due to a recent, successful re-baselining exercise that sees all Key Output realisation dates aligned with Programme Business Case 2 (PBC2) commitments. The bulk of TRU's benefits will be delivered by the mid-2030s, with additional digital signalling capability becoming available by the early 2040s. The programme has a stable integrated schedule that was recently updated. Baseline 2.1 was agreed last year between Enterprise partners and maintains Key Output dates for KO1 to KO5b as agreed at PBC2, as well as the PBC2 funding position for all infrastructure sub-projects. Baseline 2.1 creates a stable programme baseline position with a realistic and achievable critical path now committed to with both delivery Alliances as part of the W34 and E234 contract awards. It also forecasts P50 and P80 delivery dates and timelines for benefits delivery. The approval of the TOC-Business Case in March 2025, confirmed alignment of train-operator related delivery plans with Baseline 2.1. KO2 (electrification of services between Manchester Victoria and Stalybridge) was completed ahead of schedule at the end of 2024, and KO3 (electrification of TransPennine Services between York and Church Fenton) is on track to be delivered by summer 2025.","fyBaseline":848.82,"fyForecast":843.99,"fyVariance":0.57,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":11056.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 11104 to 11056. This is primarily due to the following factors‚ Adjustment to reflect change in budget post Spending Review Phase 1.","benefits":2978.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 2978. This is primarily due to the following factors‚ This is because we have not restated the benefits baseline since Programme Business Case 2 (May 2023).","themes":["Delivery & schedule","Cost & funding","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to continued strong programme performance, integration of programmes across the north of England, and senior management turnover. To date, £7.3bn has been committed to the upgrade, with the…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":0,"attentionScore":18,"attentionReasons":["Current published delivery confidence is Amber"]},{"id":"BEIS_0090_2122-Q4","year":2026,"name":"AUTOMOTIVE TRANSFORMATION FUND (ATF)","department":"DBT","category":"Infrastructure and Construction","description":"The Automotive Transformation Fund (ATF) is a major government programme supporting large-scale capital investment in the UK automotive sector, with a primary focus on transitioning supply chains and manufacturing capability towards zero-emission vehicles. Originally established to secure strategic inward investment and develop domestic capability in key areas such as battery manufacturing and associated supply chains, the programme has supported a portfolio of capital-intensive projects across the UK. While DRIVE35 now represents the future integrated programme for the sector, ATF continues to operate as a legacy programme, managing and delivering existing grant commitments and ensuring successful completion of funded projects. It remains a critical component of the UK’s industrial strategy, underpinning supply chain resilience and long-term competitiveness.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The current Delivery Confidence Assessment reflects the transition of ATF from an active award programme to a delivery and stewardship phase, managing a complex portfolio of high-value, long-term capital projects. Key drivers of the assessment include: the complexity and scale of funded projects, many of which involve multiple commercial partners and long delivery timelines; the ongoing need for robust monitoring, assurance, and contractual management of legacy commitments; and residual delivery risks associated with project execution, market conditions, and supply chain dependencies. Additionally, programme delivery has been impacted by organisational changes and resourcing pressures within DBT, which have required strengthening of PMO capability and oversight to maintain delivery confidence. The Department has taken steps to mitigate these risks through enhanced governance, strengthened programme management arrangements, and continued senior oversight. Overall, the programme remains deliverable, with a focus on ensuring effective oversight of existing commitments and managing risks to delivery and benefits realisation.","startDate":null,"endDate":null,"scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same at 31/03/2025. All future provision at that point moves into DRIVE35.","fyBaseline":94.92,"fyForecast":16.44,"fyVariance":82.68,"varianceNarrative":"The budget variance is less than or equal to 5%","wholeLifeCost":702.72,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 increased slightly from last year's WLC £671 to £675m.","benefits":12558.16,"benefitsNarrative":"The project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) have been reported at £1,427.4m - this is the first year that benefits have been reported.","themes":["Delivery & schedule","Cost & funding","Governance & assurance","Commercial & supply chain"],"evidenceExcerpt":"The current Delivery Confidence Assessment reflects the transition of ATF from an active award programme to a delivery and stewardship phase, managing a complex portfolio of high-value, long-term capital projects. Key drivers of the assessment include: the complexity and scale of funded projects, many of which involve multiple commercial partners and long…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"BEIS_0090_2122-Q4","year":2023,"name":"Automotive Transformation Fund","department":"DBT","category":"Infrastructure and Construction","description":"The Automotive Transformation Fund (ATF) is designed to support the creation of an internationally competitive zero emission vehicle supply chain in the UK. The ATF supports late stage R&D and capital investment across strategically important parts of the electric vehicle supply chain: batteries, motors and drives, power electronics, hydrogen fuel cells and storage tanks. Specific objectives relate to the creation and safeguarding of jobs, securing private investment, supporting the UK's role in tackling climate change by reducing global emissions from the sector, and helping to build secure and resilient supply chains and supporting EV manufacturers to meet rules of origin requirements.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 is Amber. This is primarily due to the following factors. Having surrendered some programme budget in the past year, the Automotive Transformation Fund (ATF) team will assess the impact on benefit realisation and continue to closely monitor the benefits delivered by means of annual project reviews. The team continue to assess cases in the ATF pipeline and to hold discussions with original equipment manufacturers (OEMs) regarding potential electric vehicle investments in the UK (which are complementary to the supply chain investments the ATF is designed to support) . The team will continue their engagement with industry and discussions across government to establish a long-term commitment to secure zero-emission vehicle manufacturing in the UK and improve the speed at which government provides support.","startDate":"2020-07-31","endDate":"2025-03-31","scheduleNarrative":"The project's end-date at 22/23-Q4 is 2025-03-31. This is primarily due to the following factors. Although the Automotive Transformation Fund is currently only funded to March 2025, the programme team have begun engagement with industry and discussions across government to consider how the government can build on existing interventions to take decisive action to ensure future investment in zero emission vehicle manufacturing.","fyBaseline":191.31,"fyForecast":7.42,"fyVariance":-96.0,"varianceNarrative":"The budget variance exceeds 5%. The ATF has surrendered some programme budget in the past year and other forecasted project spend has slipped right, for a number of reasons, into future years. The ATF team will assess the impact on benefit realisation and continue to closely monitor the benefits delivered by means of annual project reviews. The team will continue their engagement with industry and discussions across government to establish a long-term commitment to secure zero-emission vehicle manufacturing in the UK and improve the speed at which government provides support.","wholeLifeCost":747.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 22/23-Q4 is 747m. This is primarily due to the following factors. This was the capital funding awarded to the Automotive Transformation Fund at previous Spending Reviews.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. The project did not provide departmental-agree monetised benefits at 22/23-Q4.The project did not provide departmental-agree monetised benefits at 22/23-Q4.The project did not provide departmental-agree monetised benefits at 22/23-Q4. We updated and submitted our business case along with our bid in the last Spending Review. A complementary business case for submitted but did not get approved. As the two business cases were complementary, our analysts modelled their combined impact on the automotive industry and apportioned the benefits proportionately but as only the ATF secured additional funding analysts are now in the process of reviewing/updating the ATF business case in accordance with the Spending Review outcome and to reflect a reduction in programme budget in the years since. The impact on benefit realisation will be reviewed and the benefits profile in the business case adjusted accordingly.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule"],"evidenceExcerpt":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 is Amber. This is primarily due to the following factors. Having surrendered some programme budget in the past year, the Automotive Transformation Fund (ATF) team will assess the impact on benefit realisation and continue to closely monitor the benefits delivered by means of…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"BEIS_0090_2122-Q4","year":2024,"name":"Automotive Transformation Fund","department":"DBT","category":"Infrastructure and Construction","description":"The Automotive Transformation Fund (ATF) aims to support the creation of an internationally competitive electric vehicle supply chain in the UK. It provides support to late-stage R&D and capital investments in strategically important technologies. This includes unlocking strategic investments in gigafactories, motors and drives, power electronics, and fuel cell systems.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. As of March 2024, the total value of in principle and final offers made under the ATF is over 550 million. Our approach has already attracted landmark projects across the country including Tata's investment of over 4 billion in a new 40GWh gigafactory and Ford's investment of 380m in the production of electric power units at Halewood. In FY23/24 the ATF surrendered programme budget. Alongside this, significant resourcing challenges impacted the programme's ability to meet its objectives including a lack of capacity to onboard new ATF cases.The current programme will end-March 2025 but as part of the Advanced Manufacturing Plan, DBT has announced 2bn of capital and R&D funding to 2030, building on the work of the Automotive Transformation Fund and the Advanced Propulsion Centre R&D programmes. Furthermore, the ATF is currently in the process of implementing streamlining proposals to improve the efficiency of the ATF process.","startDate":"2020-07-31","endDate":"2025-03-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2025-03-31. This is primarily due to the following factors. The Automotive Transformation Fund is funded until March 2025. However, as part of the Advanced Manufacturing Plan, we have announced over 2bn of capital and R&D funding to 2030, boosting the UK's competitiveness and unlocking strategic investments in our automotive industry. This funding will be delivered via Auto2030, an ambitious programme building on the work of the Automotive Transformation Fund and the Advanced Propulsion Centre R&D programmes, ensuring continuity in HMG support.","fyBaseline":260.0,"fyForecast":162.14,"fyVariance":-38.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The Automotive Transformation Fund has surrendered some programme budget in the past year. The ATF team are in the process of assessing the impact of this on benefits realisation. Furthermore, the programme is looking to streamline the capital grants process to significantly improve the speed with which government responds to all full and complete applications for capital grants, in line with the headline recommendations from the Harrington Review into the government's approach to attracting foreign direct investment.","wholeLifeCost":671.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 decreased from 747m. to 671m. This is primarily due to the following factors. The baseline costs have been updated to reflect the funding awarded to the Automotive Transformation Fund until March 2025.","benefits":0.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 0m. The ATF will deliver monetised benefits. These are direct employment in the automotive and electrical equipment (i.e. battery) sectors, indirect employment in their supply chains, and R&D spillover returns. The ATF analysts are in the process of reviewing/updating the ATF business case to produce an updated benefits section according to best practice principles which is with HMT for approval. It will ensure alignment of the identified benefits with the GMPP's format and will address reductions in the ATF budget which have occurred to date. Furthermore, there are significant wider benefits such as global CO2 emissions savings and a contribution to reducing regional inequalities in the UK, which will not be included in the monetised appraisal.","themes":["Cost & funding","Delivery & schedule","Workforce & capability","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. As of March 2024, the total value of in principle and final offers made under the ATF is over 550 million. Our approach has already attracted landmark projects across the…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"BEIS_0090_2122-Q4","year":2025,"name":"AUTOMOTIVE TRANSFORMATION FUND (ATF)","department":"DBT","category":"Infrastructure and Construction","description":"The Automotive Transformation Fund (ATF) aims to support the creation of an internationally competitive electric vehicle supply chain in the UK. It provides support to late-stage R&D and capital investments in strategically important technologies. This includes unlocking strategic investments in gigafactories, motors and drives, power electronics, and fuel cell systems.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ ATF funding has already helped secure key investments, including Nissan’s £2 billion investment to produce two new electric vehicle models in Sunderland building on the £1 billion electric vehicle hub announced by Nissan and their battery partner AESC in 2021,Ford’s investment of £380m in the production of electric power units at Halewood, Johnson Matthey’s investment of more than £60 million in Hertfordshire to develop hydrogen technologies. Alongside this, significant resourcing challenges impacted the programme’s ability to meet its objectives including a lack of capacity to onboard new ATF cases.​ The current programme ended-March 2025 but as part of the Advanced Manufacturing Plan, DBT will announced a £2bn of capital and R&D funding to 2030, building on the work of the Automotive Transformation Fund and the Advanced Propulsion Centre R&D programmes.","startDate":"2020-07-31","endDate":null,"scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2025. This is primarily due to the following factors‚ The Automotive Transformation Fund is funded until March 2025. However, as part of the Advanced Manufacturing Plan, we have announced over £2bn of capital and R&D funding to 2030, boosting the UK’s competitiveness and unlocking strategic investments in our automotive industry. This funding will be delivered via DRIVE35, an ambitious programme building on the work of the Automotive Transformation Fund and the Advanced Propulsion Centre R&D programmes, ensuring continuity in HMG support.","fyBaseline":260.0,"fyForecast":162.14,"fyVariance":37.64,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The Automotive Transformation Fund has surrendered some programme budget in the past year. The ATF team will assess the impact of this on benefits realisation.","wholeLifeCost":671.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 671. This is primarily due to the following factors‚ The baseline costs have been updated to reflect the funding awarded to the Automotive Transformation Fund until March 2025.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ The ATF will deliver monetised benefits. These are direct employment in the automotive and electrical equipment (i.e. battery) sectors, indirect employment in their supply chains, and R&D spillover returns. The ATF analysts are in the process of reviewing/updating the ATF business case to produce an updated benefits section according to best practice principles. It will ensure alignment of the identified benefits with the GMPP’s format and will address reductions in the ATF budget which have occurred to date. Furthermore, there are significant wider benefits such as global CO2 emissions savings and a contribution to reducing regional inequalities in the UK, which will not be included in the monetised appraisal.","themes":["Cost & funding","Workforce & capability","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ ATF funding has already helped secure key investments, including Nissan’s £2 billion investment to produce two new electric vehicle models in Sunderland building on…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"BEIS_0090_2122-Q4","year":2026,"name":"AUTOMOTIVE TRANSFORMATION FUND (ATF)","department":"DBT","category":"Infrastructure and Construction","description":"The Automotive Transformation Fund (ATF) is a major government programme supporting large-scale capital investment in the UK automotive sector, with a primary focus on transitioning supply chains and manufacturing capability towards zero-emission vehicles. Originally established to secure strategic inward investment and develop domestic capability in key areas such as battery manufacturing and associated supply chains, the programme has supported a portfolio of capital-intensive projects across the UK. While DRIVE35 now represents the future integrated programme for the sector, ATF continues to operate as a legacy programme, managing and delivering existing grant commitments and ensuring successful completion of funded projects. It remains a critical component of the UK’s industrial strategy, underpinning supply chain resilience and long-term competitiveness.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The current Delivery Confidence Assessment reflects the transition of ATF from an active award programme to a delivery and stewardship phase, managing a complex portfolio of high-value, long-term capital projects. Key drivers of the assessment include: the complexity and scale of funded projects, many of which involve multiple commercial partners and long delivery timelines; the ongoing need for robust monitoring, assurance, and contractual management of legacy commitments; and residual delivery risks associated with project execution, market conditions, and supply chain dependencies. Additionally, programme delivery has been impacted by organisational changes and resourcing pressures within DBT, which have required strengthening of PMO capability and oversight to maintain delivery confidence. The Department has taken steps to mitigate these risks through enhanced governance, strengthened programme management arrangements, and continued senior oversight. Overall, the programme remains deliverable, with a focus on ensuring effective oversight of existing commitments and managing risks to delivery and benefits realisation.","startDate":null,"endDate":null,"scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same at 31/03/2025. All future provision at that point moves into DRIVE35.","fyBaseline":94.92,"fyForecast":16.44,"fyVariance":82.68,"varianceNarrative":"The budget variance is less than or equal to 5%","wholeLifeCost":702.72,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 increased slightly from last year's WLC £671 to £675m.","benefits":12558.16,"benefitsNarrative":"The project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) have been reported at £1,427.4m - this is the first year that benefits have been reported.","themes":["Delivery & schedule","Cost & funding","Governance & assurance","Commercial & supply chain"],"evidenceExcerpt":"The current Delivery Confidence Assessment reflects the transition of ATF from an active award programme to a delivery and stewardship phase, managing a complex portfolio of high-value, long-term capital projects. Key drivers of the assessment include: the complexity and scale of funded projects, many of which involve multiple commercial partners and long…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"BEIS_0090_2122-Q4","year":2025,"name":"AUTOMOTIVE TRANSFORMATION FUND (ATF)","department":"DBT","category":"Infrastructure and Construction","description":"The Automotive Transformation Fund (ATF) aims to support the creation of an internationally competitive electric vehicle supply chain in the UK. It provides support to late-stage R&D and capital investments in strategically important technologies. This includes unlocking strategic investments in gigafactories, motors and drives, power electronics, and fuel cell systems.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ ATF funding has already helped secure key investments, including Nissan’s £2 billion investment to produce two new electric vehicle models in Sunderland building on the £1 billion electric vehicle hub announced by Nissan and their battery partner AESC in 2021,Ford’s investment of £380m in the production of electric power units at Halewood, Johnson Matthey’s investment of more than £60 million in Hertfordshire to develop hydrogen technologies. Alongside this, significant resourcing challenges impacted the programme’s ability to meet its objectives including a lack of capacity to onboard new ATF cases.​ The current programme ended-March 2025 but as part of the Advanced Manufacturing Plan, DBT will announced a £2bn of capital and R&D funding to 2030, building on the work of the Automotive Transformation Fund and the Advanced Propulsion Centre R&D programmes.","startDate":"2020-07-31","endDate":null,"scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2025. This is primarily due to the following factors‚ The Automotive Transformation Fund is funded until March 2025. However, as part of the Advanced Manufacturing Plan, we have announced over £2bn of capital and R&D funding to 2030, boosting the UK’s competitiveness and unlocking strategic investments in our automotive industry. This funding will be delivered via DRIVE35, an ambitious programme building on the work of the Automotive Transformation Fund and the Advanced Propulsion Centre R&D programmes, ensuring continuity in HMG support.","fyBaseline":260.0,"fyForecast":162.14,"fyVariance":37.64,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The Automotive Transformation Fund has surrendered some programme budget in the past year. The ATF team will assess the impact of this on benefits realisation.","wholeLifeCost":671.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 671. This is primarily due to the following factors‚ The baseline costs have been updated to reflect the funding awarded to the Automotive Transformation Fund until March 2025.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ The ATF will deliver monetised benefits. These are direct employment in the automotive and electrical equipment (i.e. battery) sectors, indirect employment in their supply chains, and R&D spillover returns. The ATF analysts are in the process of reviewing/updating the ATF business case to produce an updated benefits section according to best practice principles. It will ensure alignment of the identified benefits with the GMPP’s format and will address reductions in the ATF budget which have occurred to date. Furthermore, there are significant wider benefits such as global CO2 emissions savings and a contribution to reducing regional inequalities in the UK, which will not be included in the monetised appraisal.","themes":["Cost & funding","Workforce & capability","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ ATF funding has already helped secure key investments, including Nissan’s £2 billion investment to produce two new electric vehicle models in Sunderland building on…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":-1,"transition":"Improved","endDateDeltaDays":null,"attentionScore":15,"attentionReasons":["In-year forecast variance is +82.7%"]},{"id":"DESNZ_0333_2324-Q4","year":2026,"name":"Review of Electricity Market Arrangements (REMA)","department":"DESNZ","category":"Government Transformation and Service Delivery","description":"The Review of Electricity Market Arrangements (REMA) Programme was set up in 2022 to consider how best to deliver a fair, affordable and secure power system. The review concluded in July 2025 with the Secretary of State taking the decision to retain a single national GB-wide wholesale market and introduce an ambitious package of reform to improve the efficiency of our future power system under a new programme called Reformed National Pricing (RNP). As such, the REMA Programme was officially closed in summer 2025 and offboarded as a GMPP programme at the end of the 2025/26 financial year.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Review of Electricity Market Arrangements (REMA) was successfully delivered in July 2025 with the Secretary of State's decision to retain and reform a national electricity market.","startDate":"2024-02-05","endDate":"2026-04-30","scheduleNarrative":"The Review of Electricity Market Arrangements (REMA) was successfully delivered in July 2025 with the Secretary of State's decision to retain and reform a national electricity market. The schedule to deliver on the Secretary of State's decision will be carried out under the programme called Reformed National Pricing (RNP).","fyBaseline":7.58,"fyForecast":3.54,"fyVariance":53.38,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the Programme closing in July 2025, with costs incurred reflecting REMA’s full lifecycle to closure, compared against a full-year 2025/26 budget profile","wholeLifeCost":29.18,"costNarrative":"The Whole Life Costs for REMA provides the total cost of the programme from it's inception in 2022 through to it's closure in July 2025, following the successful delivery of the programme that led to the Secretary of State's decision to retain and reform a national electricity market.","benefits":null,"benefitsNarrative":"Exempt under Section 22 - Information intended for future publication","themes":["Commercial & supply chain","Approvals & decisions","Cost & funding","Delivery & schedule"],"evidenceExcerpt":"The Review of Electricity Market Arrangements (REMA) was successfully delivered in July 2025 with the Secretary of State's decision to retain and reform a national electricity market. The Review of Electricity Market Arrangements (REMA) was successfully delivered in July 2025 with the Secretary of State's decision to retain and reform a national electricity…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"DESNZ_0333_2324-Q4","year":2024,"name":"Review of Electricity Market Arrangements (REMA)","department":"DESNZ","category":"Government Transformation and Service Delivery","description":"Reforming electricity markets through the Review of Electricity Market Arrangements (REMA) programme is vital to the delivery of the government's plan to deliver a fully decarbonised electricity system by 2035, subject to security of supply.The aim of the Programme is to identify and implement the necessary reforms for electricity market arrangements. This is aimed at driving the required investment and ensuring the efficient operation of a secure, low-carbon electricity system by 2035.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. The Programme Plan up to December 2024 was approved by the Programme Board on 27th March 2024 and the Integrated Assurance and Approvals Plans (IAAP) and Risk Potential Assessment (RPA) were approved. A Gateway 1 Review Assessment meeting took place on the 25th March 2024, which set the scope of the review. Keyholders still to be allocated to support development of the Strategic Outline Business Case (SOBC), however required documentation has been shared with (Portfolio and Investment Committee) PIC.","startDate":"2024-02-05","endDate":"2035-12-31","scheduleNarrative":"The project's end-date at 23/24-Q4 is 2035-12-31. This is primarily due to the following factors. Reforming electricity markets through the Review of Electricity Market Arrangements (REMA) programme is vital to the delivery of the government's plan to deliver a fully decarbonised electricity system by 2035","fyBaseline":4.63,"fyForecast":4.19,"fyVariance":-10.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. REMAs budget settlement details are still to be defined for this financial year 24/25, pending conclusion of the departmental business planning process.","wholeLifeCost":11.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 23/24-Q4 is 11m. This is primarily due to the following factors. This WLC Covers Programme (Resource) Costs to 2035.","benefits":0.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 0m. There are a range of underlying market failures and limitations of existing interventions which mean that the current electricity market framework will not deliver the investment in the kinds of technologies at the capacity that we need. The intended REMA outcomes for 2035 are to Achieve Net Zero, Securing Energy Supply and delivering Reasonable Price to Consumers. However, intended outcomes and benefits to consumers and industry will be dependent on policy options the REMA Programme takes taken to implementation which will be unknown until Summer 2025. Without market reform, system costs over the period 2030-2050 could be around 35bn higher (2023 prices) with carbon emissions that exceed our CB6 and Net Zero commitments. Around half of these additional costs stem from capacity building in sub-optimal locations, and the remainder from having to build unabated gas in order to meet the demand for flexible supply in the absence of low carbon flexible technologies. The Programme offers several benefits, including reducing carbon emissions, enhancing energy security, ensuring greater cost-effectiveness of the electricity system, and delivering fair consumer deals. Additionally, it facilitates the decarbonisation of heat and transport through electrification.","themes":["Cost & funding","Governance & assurance","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. The Programme Plan up to December 2024 was approved by the Programme Board on 27th March 2024 and the Integrated Assurance and Approvals Plans (IAAP) and Risk Potential Assessment (RPA) were approved. A Gateway 1 Review…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"DESNZ_0333_2324-Q4","year":2025,"name":"Review of Electricity Market Arrangements (REMA)","department":"DESNZ","category":"Government Transformation and Service Delivery","description":"Markets are at the heart of the GB electricity system. They drive competition and innovation to benefit consumers. They provide price signals which guide decisions on electricity supply and demand, investment in new generating capacity and flexibility, and the efficient operation of the system. Reforming electricity markets through REMA is therefore at the heart of the Government’s ambitions to transform the power sector. Our underlying electricity market arrangements were adopted in an era of large, centralised, dispatchable unabated fossil fuel-based generation. The previous major round of electricity market reform (EMR) which ran from 2010-13, focused on how best to scale-up low-carbon renewable generation in a power system still largely designed for fossil fuel technologies – by accelerating the journey to a renewables-based system through a new Contracts for Difference (CfD) scheme while ensuring security of supply by introducing the Capacity Market (CM) scheme. The purpose of REMA is to explore options to evolve the foundations of the electricity market and make it fit-for-purpose to move to low-carbon technologies, while managing a smooth and low-cost transition away from our remaining unabated fossil fuel generation capacity.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ No decision has been taken yet on whether to adopt Zonal Pricing or Reformed National Pricing. We plan to provide clarity to bidders ahead of AR7 opening in summer. This tight timeframe is impacting our delivery confidence.","startDate":"2024-02-05","endDate":"2035-12-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/12/2035. This is primarily due to the following factors‚ no decision having as yet been taken on whether to adopt Zonal Pricing or Reformed National Pricing. We plan to provide clarity to bidders ahead of AR7 opening in summer.","fyBaseline":9.67,"fyForecast":9.34,"fyVariance":3.41,"varianceNarrative":"The budget variance is less than or equal to 5%. The in-year variance is within the stated tolerance +/- 5%.","wholeLifeCost":null,"costNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","benefits":null,"benefitsNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","themes":["Cost & funding","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ No decision has been taken yet on whether to adopt Zonal Pricing or Reformed National Pricing. We plan to provide clarity to bidders ahead of AR7 opening in summer.…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"DESNZ_0333_2324-Q4","year":2026,"name":"Review of Electricity Market Arrangements (REMA)","department":"DESNZ","category":"Government Transformation and Service Delivery","description":"The Review of Electricity Market Arrangements (REMA) Programme was set up in 2022 to consider how best to deliver a fair, affordable and secure power system. The review concluded in July 2025 with the Secretary of State taking the decision to retain a single national GB-wide wholesale market and introduce an ambitious package of reform to improve the efficiency of our future power system under a new programme called Reformed National Pricing (RNP). As such, the REMA Programme was officially closed in summer 2025 and offboarded as a GMPP programme at the end of the 2025/26 financial year.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Review of Electricity Market Arrangements (REMA) was successfully delivered in July 2025 with the Secretary of State's decision to retain and reform a national electricity market.","startDate":"2024-02-05","endDate":"2026-04-30","scheduleNarrative":"The Review of Electricity Market Arrangements (REMA) was successfully delivered in July 2025 with the Secretary of State's decision to retain and reform a national electricity market. The schedule to deliver on the Secretary of State's decision will be carried out under the programme called Reformed National Pricing (RNP).","fyBaseline":7.58,"fyForecast":3.54,"fyVariance":53.38,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the Programme closing in July 2025, with costs incurred reflecting REMA’s full lifecycle to closure, compared against a full-year 2025/26 budget profile","wholeLifeCost":29.18,"costNarrative":"The Whole Life Costs for REMA provides the total cost of the programme from it's inception in 2022 through to it's closure in July 2025, following the successful delivery of the programme that led to the Secretary of State's decision to retain and reform a national electricity market.","benefits":null,"benefitsNarrative":"Exempt under Section 22 - Information intended for future publication","themes":["Commercial & supply chain","Approvals & decisions","Cost & funding","Delivery & schedule"],"evidenceExcerpt":"The Review of Electricity Market Arrangements (REMA) was successfully delivered in July 2025 with the Secretary of State's decision to retain and reform a national electricity market. The Review of Electricity Market Arrangements (REMA) was successfully delivered in July 2025 with the Secretary of State's decision to retain and reform a national electricity…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"DESNZ_0333_2324-Q4","year":2025,"name":"Review of Electricity Market Arrangements (REMA)","department":"DESNZ","category":"Government Transformation and Service Delivery","description":"Markets are at the heart of the GB electricity system. They drive competition and innovation to benefit consumers. They provide price signals which guide decisions on electricity supply and demand, investment in new generating capacity and flexibility, and the efficient operation of the system. Reforming electricity markets through REMA is therefore at the heart of the Government’s ambitions to transform the power sector. Our underlying electricity market arrangements were adopted in an era of large, centralised, dispatchable unabated fossil fuel-based generation. The previous major round of electricity market reform (EMR) which ran from 2010-13, focused on how best to scale-up low-carbon renewable generation in a power system still largely designed for fossil fuel technologies – by accelerating the journey to a renewables-based system through a new Contracts for Difference (CfD) scheme while ensuring security of supply by introducing the Capacity Market (CM) scheme. The purpose of REMA is to explore options to evolve the foundations of the electricity market and make it fit-for-purpose to move to low-carbon technologies, while managing a smooth and low-cost transition away from our remaining unabated fossil fuel generation capacity.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ No decision has been taken yet on whether to adopt Zonal Pricing or Reformed National Pricing. We plan to provide clarity to bidders ahead of AR7 opening in summer. This tight timeframe is impacting our delivery confidence.","startDate":"2024-02-05","endDate":"2035-12-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/12/2035. This is primarily due to the following factors‚ no decision having as yet been taken on whether to adopt Zonal Pricing or Reformed National Pricing. We plan to provide clarity to bidders ahead of AR7 opening in summer.","fyBaseline":9.67,"fyForecast":9.34,"fyVariance":3.41,"varianceNarrative":"The budget variance is less than or equal to 5%. The in-year variance is within the stated tolerance +/- 5%.","wholeLifeCost":null,"costNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","benefits":null,"benefitsNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","themes":["Cost & funding","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ No decision has been taken yet on whether to adopt Zonal Pricing or Reformed National Pricing. We plan to provide clarity to bidders ahead of AR7 opening in summer.…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":-1,"transition":"Improved","endDateDeltaDays":-3532,"attentionScore":15,"attentionReasons":["In-year forecast variance is +53.4%"]},{"id":"MOD_0080_1213-Q1","year":2026,"name":"DREADNOUGHT","department":"MOD","category":"Military Capability","description":"The Dreadnought Programme will maintain the UK's sovereign ability to deliver a deterrent effect by means of a submarine-launched; inter-continental ballistic missile nuclear weapon capability. The programme will achieve this by replacing in-service the current Vanguard Class SSBNs with four Dreadnought Class SSBNs. The programme requirement was detailed in the Government White Paper 2006: The Future of the UK's Nuclear Deterrent; and subsequently endorsed in both the 2015 Strategic Defence and Security Review and the 2021 Integrated Review of Security; Defence; Development and Foreign Policy.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 24 - National security","startDate":"2011-04-14","endDate":null,"scheduleNarrative":"Exempt under Section 24 - National security","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Exempt under Section 43 - Commercial interests","themes":["Commercial & supply chain"],"evidenceExcerpt":"Exempt under Section 24 - National security Exempt under Section 24 - National security","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"MOD_0080_1213-Q1","year":2020,"name":"DREADNOUGHT","department":"MOD","category":"Military Capability","description":"The design, development and manufacture of the Dreadnought ballistic missile submarines.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber, which has not changed since last year�s Q2 1819 Amber, due primarily to the following factors; - The Dreadnought submarine programme remains within budget and on track for the First of Class, HMS Dreadnought, to enter service in the early 2030s. Staged investments have allowed good progress to continue on the whole boat design and the construction process. - Design and construction activity is progressing at pace through Delivery Phase 2, which will run until March 2021. This year has seen further investment in the current phase of the programme when construction work officially started on Valiant, the second in class of Dreadnought submarines. - These investments support new facilities for BAE Systems and the next generation of facilities at Rolls-Royce's Raynesway site; needed to deliver nuclear propulsion power plants for all four Dreadnought submarines. This award will support over 600 highly skilled Rolls-Royce personnel, enabling the company to make further commitments into the supply-chain. Since the Q2 1920 (30th September 2019) Amber IPA DCA, the following primary project actions have impacted the original Q2 IPA DCA; - As reported previously, there have been technical complications with the manufacturing of the missile tubes to be used in the Common Missile Compartment being developed for our 3 submarines and the United States (US) Columbia Class. - Build quality issues on some missile tubes for the Dreadnought Class submarines were identified in 2018. Assessment and repair work continues with the main supplier and their subcontractors, with our world class UK engineers working alongside their US counterparts to achieve the earliest supply of missile tubes into the Dreadnought programme.","startDate":"2011-04-14","endDate":null,"scheduleNarrative":"Exempt under Section 22 of Freedom of Information Act 2000 (Information intended for future publication)","fyBaseline":1613.36,"fyForecast":1613.36,"fyVariance":0.0,"varianceNarrative":"Budget variance less than 5%","wholeLifeCost":30099.34,"costNarrative":"The baseline Whole Life Cost at Q2 1920 (30th September 2019) is �30,099.34 m, has increased by �39.28 m since last year's Q2 1819 (�m) baseline Whole Life Cost of �30,060.07 m, due primarily to the following factors; - The whole life costs figure is for the acquisition of the submarines and associated additional infrastructure, beyond that currently in place for the Vanguard class, and the balance between the current in-service costs and those estimated to support the new boats. - The understanding of the Dreadnought design has matured significantly. Latest cost estimates provide a much more robust view. The programme still forecasts to come within the original estimates. - Over this last period major suppliers have firmed up their costings; this now provides a greater level of certainty in the financial forecast. Since the Q2 1920 (30th September 2019) �30,099.34 m baseline Whole Life Cost, the following primary project actions have impacted the original Q2 baseline Whole Life Cost; - A greater understanding of the technical requirements for the Combat Systems have increased material cost.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Scope & requirements","Technical & integration"],"evidenceExcerpt":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber, which has not changed since last year�s Q2 1819 Amber, due primarily to the following factors; - The Dreadnought submarine programme remains within budget and on track for the First of Class, HMS Dreadnought, to enter service in the early 2030s. Staged…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2020","sourceLabel":"IPA Annual Report 2019-20"},{"id":"MOD_0080_1213-Q1","year":2021,"name":"Dreadnought","department":"MOD","category":"Military Capability","description":"To deliver a four Boat Dreadnought SSBN Class within the approved performance, cost and time parameters, and contribute to the sustainment of the UK submarine design and manufacturing capability for Dreadnought and beyond. The scope of the programme covers the design, development and manufacture of four Dreadnought SSBN Class submarines, and other costs related to bringing this capability on line, in response to the requirement detailed in the Government White Paper 2006: The Future of the UK's Nuclear Deterrent. The requirement for a class of SSBNs (Dreadnought) to replace the current Vanguard Class was re-endorsed in SDSR 15 and in the 2021 Integrated Review of Security, Defence, Development and Foreign Policy.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber. This is primarily due to the following factors: The Dreadnought submarine programme remains on track for the First of Class, HMS Dreadnought, to enter service in the early 2030s. Staged investments have delivered good progress on the whole boat design, production and supporting infrastructure development. The impact of COVID-19 on Industry Partners, and across the whole supply chain has been proactively managed, aided by improving collaboration and the cultural change being embedded through the new Target Operating Model. Initiatives to improve schedule performance and cost control are in progress.","startDate":"2011-04-14","endDate":null,"scheduleNarrative":"Exempt under Section 24 of the Freedom of Information Act 2000 (National security)","fyBaseline":1850.0,"fyForecast":1850.5,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":31510.78,"costNarrative":"Compared to financial year 19/20-Q2, the projects Baseline Whole Life Cost increased from �30099.34m to �31510.78m. This is primarily due to the following factors: The understanding of the Dreadnought design has matured and the latest cost estimates include a robust and detailed programme scope which, alongside investment in forecasting and cost assurance, has added significantly to the confidence in the projected costs. The programme continues to forecast to come within the �31Bn + �10Bn contingency budget set in 2015, a position validated by independent cost estimation.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Scope & requirements","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber. This is primarily due to the following factors: The Dreadnought submarine programme remains on track for the First of Class, HMS Dreadnought, to enter service in the early 2030s. Staged investments have delivered good progress…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21"},{"id":"MOD_0080_1213-Q1","year":2022,"name":"DREADNOUGHT","department":"MOD","category":"Military Capability","description":"To deliver a four Boat Dreadnought SSBN Class within the approved performance, cost and time parameters, and contribute to the sustainment of the UK submarine design and manufacturing capability for Dreadnought and beyond. The scope of the programme covers the design, development and manufacture of four Dreadnought SSBN Class submarines, and other costs related to bringing this capability on line, in response to the requirement detailed in the Government White Paper 2006: The Future of the UK's Nuclear Deterrent. The requirement for a class of SSBNs (Dreadnought) to replace the current Vanguard Class was re-endorsed in SDSR 15 and in the 2021 Integrated Review of Security, Defence, Development and Foreign Policy.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber. This is primarily due to the following factors: The Dreadnought submarine programme remains on track for the First of Class, HMS Dreadnought, to enter service in the early 2030s. Staged investments have delivered good progress on the whole boat design, production and supporting infrastructure development.","startDate":null,"endDate":null,"scheduleNarrative":"Exempt under Section 24 of the Freedom of Information Act 2000.","fyBaseline":242000.0,"fyForecast":242000.0,"fyVariance":242000.0,"varianceNarrative":"Exempt under Section 24 of the Freedom of Information Act 2000.","wholeLifeCost":242000.0,"costNarrative":"Exempt under Section 24 of the Freedom of Information Act 2000.","benefits":null,"benefitsNarrative":"","themes":["Delivery & schedule","Cost & funding","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber. This is primarily due to the following factors: The Dreadnought submarine programme remains on track for the First of Class, HMS Dreadnought, to enter service in the early 2030s. Staged investments have delivered good progress…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"MOD_0080_1213-Q1","year":2023,"name":"DREADNOUGHT","department":"MOD","category":"Military Capability","description":"The Dreadnought Programme will maintain the UK's sovereign ability to deliver a deterrent effect by means of a submarine-launched; inter-continental ballistic missile nuclear weapon capability. The programme will achieve this by replacing in-service the current Vanguard Class SSBNs with four Dreadnought Class SSBNs. The programme requirement was detailed in the Government White Paper 2006: The Future of the UK's Nuclear Deterrent; and subsequently endorsed in both the 2015 Strategic Defence and Security Review and the 2021 Integrated Review of Security; Defence; Development and Foreign Policy.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. The Dreadnought submarine programme remains on track for the First of Class HMS Dreadnought to enter service in the early 2030s. Staged investments have delivered good progress on the whole boat design, production and supporting infrastructure development. However it should be recognised for a programme of this compexity, scale and duration, there is real risk, not least from interfacing programmes of work, and it is therefore prudent to assess as Amber in Delivery Confidence.","startDate":"2011-04-14","endDate":null,"scheduleNarrative":"Exempt under Section 24 of the Freedom of Information Act 2000 (National security)","fyBaseline":2488.82,"fyForecast":2535.5,"fyVariance":2.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":33989.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 22/23-Q4 is 33989m. This is primarily due to the following factors. The Dreadnought programme remains on track to deliver to schedule and within the original 31 billion plus 10 billion contingency budget made in the Strategic Defence and Security Review 2015.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This programme does not report cashable benefits. Its aim is to provision the armed forces with the equipment and / or infrastructure required.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. The Dreadnought submarine programme remains on track for the First of Class HMS Dreadnought to enter service in the early 2030s. Staged investments have delivered…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"MOD_0080_1213-Q1","year":2024,"name":"DREADNOUGHT","department":"MOD","category":"Military Capability","description":"The Dreadnought Programme will maintain the UK's sovereign ability to deliver a deterrent effect by means of a submarine-launched, inter-continental ballistic missile nuclear weapon capability. The programme will achieve this by replacing in-service the current Vanguard Class SSBNs with four Dreadnought Class SSBNs. The programme requirement was detailed in the Government White Paper 2006. The Future of the UK's Nuclear Deterrent, and subsequently endorsed in both the 2015 Strategic Defence and Security Review and the 2021 Integrated Review of Security, Defence, Development and Foreign Policy.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure and Projects Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The Dreadnought submarine programme remains on track for the First of Class HMS Dreadnought to enter service in the early 2030s. Staged investments have delivered good progress on the whole boat design, production and supporting infrastructure development. However it should be recognised for a programme of this complexity, scale and duration, there is real risk, not least from interfacing programmes of work, and it is therefore appropriate to assess as Amber in Delivery Confidence.","startDate":"2011-04-14","endDate":null,"scheduleNarrative":"The Dreadnought submarine programme remains on track for the first of Class, HMS Dreadnought, to enter service in the early 2030s.","fyBaseline":2552.81,"fyForecast":2676.7,"fyVariance":4.853,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":36706.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 increased from 33989m to 36706m. This is primarily due to the following factors. Inflation costs increases.","benefits":0.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 0m.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure and Projects Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The Dreadnought submarine programme remains on track for the First of Class HMS Dreadnought to enter service in the early 2030s. Staged investments have…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"MOD_0080_1213-Q1","year":2025,"name":"DREADNOUGHT","department":"MoD","category":"Military Capability","description":"The Dreadnought Programme will maintain the UK's sovereign ability to deliver a deterrent effect by means of a submarine-launched, inter-continental ballistic missile nuclear weapon capability. The programme will achieve this by replacing in-service the current Vanguard Class submarines with four Dreadnought Class submarines. The programme requirement was detailed in the Government White Paper 2006: The Future of the UK's Nuclear Deterrent, and subsequently endorsed in both the 2015 Strategic Defence and Security Review and the 2021 Integrated Review of Security, Defence, Development and Foreign Policy.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Section 24 - National security, Section 26 - Defence","startDate":"2011-04-14","endDate":null,"scheduleNarrative":"Section 24 - National security, Section 26 - Defence","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 24 - National security, Section 26 - Defence","wholeLifeCost":null,"costNarrative":"Section 24 - National security, Section 26 - Defence","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits","themes":[],"evidenceExcerpt":"Section 24 - National security, Section 26 - Defence Section 24 - National security, Section 26 - Defence","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"MOD_0080_1213-Q1","year":2026,"name":"DREADNOUGHT","department":"MOD","category":"Military Capability","description":"The Dreadnought Programme will maintain the UK's sovereign ability to deliver a deterrent effect by means of a submarine-launched; inter-continental ballistic missile nuclear weapon capability. The programme will achieve this by replacing in-service the current Vanguard Class SSBNs with four Dreadnought Class SSBNs. The programme requirement was detailed in the Government White Paper 2006: The Future of the UK's Nuclear Deterrent; and subsequently endorsed in both the 2015 Strategic Defence and Security Review and the 2021 Integrated Review of Security; Defence; Development and Foreign Policy.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 24 - National security","startDate":"2011-04-14","endDate":null,"scheduleNarrative":"Exempt under Section 24 - National security","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Exempt under Section 43 - Commercial interests","themes":["Commercial & supply chain"],"evidenceExcerpt":"Exempt under Section 24 - National security Exempt under Section 24 - National security","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"MOD_0080_1213-Q1","year":2025,"name":"DREADNOUGHT","department":"MoD","category":"Military Capability","description":"The Dreadnought Programme will maintain the UK's sovereign ability to deliver a deterrent effect by means of a submarine-launched, inter-continental ballistic missile nuclear weapon capability. The programme will achieve this by replacing in-service the current Vanguard Class submarines with four Dreadnought Class submarines. The programme requirement was detailed in the Government White Paper 2006: The Future of the UK's Nuclear Deterrent, and subsequently endorsed in both the 2015 Strategic Defence and Security Review and the 2021 Integrated Review of Security, Defence, Development and Foreign Policy.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Section 24 - National security, Section 26 - Defence","startDate":"2011-04-14","endDate":null,"scheduleNarrative":"Section 24 - National security, Section 26 - Defence","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 24 - National security, Section 26 - Defence","wholeLifeCost":null,"costNarrative":"Section 24 - National security, Section 26 - Defence","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits","themes":[],"evidenceExcerpt":"Section 24 - National security, Section 26 - Defence Section 24 - National security, Section 26 - Defence","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":null,"transition":"Not comparable","endDateDeltaDays":null,"attentionScore":14,"attentionReasons":["In-year forecast variance is +43.0%"]},{"id":"DESNZ_0458_2425-Q3","year":2026,"name":"East Coast Cluster (ECC)","department":"DESNZ","category":"Infrastructure and Construction","description":"Overall, the CCUS programme will deliver a suite of business models and agreed revenue support ranges. These will underpin future private sector and Government investment in CCUS infrastructure (Power, Transport and Storage, Industry, and Hydrogen). This also includes the delivery of legal and regulatory frameworks to set risk/return profiles, rules, and guidance in relation to the use of Transport and Storage systems, industry and power capture, pBECCS and hydrogen. The East Coast Cluster (ECC) Anchor Project comprises the initial CCUS Transport and Storage Company (Northern Endurance Partnership) and the first capture project (Net Zero Teesside), which will establish an operational CCUS cluster in the North East of England. The anchor project is expected to be followed by a series of build out projects. These will be crucial to the creation of a competitive CCUS market, supporting the UK's drive to legally binding Net Zero targets, and delivering economic benefits.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 43 - Commercial interests","startDate":"2020-04-01","endDate":null,"scheduleNarrative":"Exempt under Section 43 - Commercial interests","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Exempt under Section 43 - Commercial interests","themes":["Commercial & supply chain"],"evidenceExcerpt":"Exempt under Section 43 - Commercial interests Exempt under Section 43 - Commercial interests","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"DESNZ_0458_2425-Q3","year":2025,"name":"East Coast Cluster Anchor (ECC)","department":"DESNZ","category":"Infrastructure and Construction","description":"Overall, the CCUS programme will deliver a suite of business models and agreed revenue support ranges. These will underpin future private sector and Government investment in CCUS infrastructure (Power, Transport and Storage, Industry, and Hydrogen). This also includes the delivery of legal and regulatory frameworks to set risk/return profiles, rules, and guidance in relation to the use of Transport and Storage systems, industry and power capture, pBECCS and hydrogen. The East Coast Cluster (ECC) Anchor Project comprises the initial CCUS Transport and Storage Company (Northern Endurance Partnership) and one emitter project (Net Zero Teeside) for one operational industrial CCUS cluster in the North East of England. It is planned that the anchor project will be followed by a series of Build Out projects. These will be crucial to the creation of a competitive CCUS market, supporting the UK's drive to legally binding Net Zero targets, and delivering economic benefits.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Section 43 - Commercial interests","startDate":null,"endDate":null,"scheduleNarrative":"Section 43 - Commercial interests","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 43 - Commercial interests","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Section 43 - Commercial interests","themes":["Commercial & supply chain"],"evidenceExcerpt":"Section 43 - Commercial interests Section 43 - Commercial interests","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"DESNZ_0458_2425-Q3","year":2026,"name":"East Coast Cluster (ECC)","department":"DESNZ","category":"Infrastructure and Construction","description":"Overall, the CCUS programme will deliver a suite of business models and agreed revenue support ranges. These will underpin future private sector and Government investment in CCUS infrastructure (Power, Transport and Storage, Industry, and Hydrogen). This also includes the delivery of legal and regulatory frameworks to set risk/return profiles, rules, and guidance in relation to the use of Transport and Storage systems, industry and power capture, pBECCS and hydrogen. The East Coast Cluster (ECC) Anchor Project comprises the initial CCUS Transport and Storage Company (Northern Endurance Partnership) and the first capture project (Net Zero Teesside), which will establish an operational CCUS cluster in the North East of England. The anchor project is expected to be followed by a series of build out projects. These will be crucial to the creation of a competitive CCUS market, supporting the UK's drive to legally binding Net Zero targets, and delivering economic benefits.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 43 - Commercial interests","startDate":"2020-04-01","endDate":null,"scheduleNarrative":"Exempt under Section 43 - Commercial interests","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Exempt under Section 43 - Commercial interests","themes":["Commercial & supply chain"],"evidenceExcerpt":"Exempt under Section 43 - Commercial interests Exempt under Section 43 - Commercial interests","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"DESNZ_0458_2425-Q3","year":2025,"name":"East Coast Cluster Anchor (ECC)","department":"DESNZ","category":"Infrastructure and Construction","description":"Overall, the CCUS programme will deliver a suite of business models and agreed revenue support ranges. These will underpin future private sector and Government investment in CCUS infrastructure (Power, Transport and Storage, Industry, and Hydrogen). This also includes the delivery of legal and regulatory frameworks to set risk/return profiles, rules, and guidance in relation to the use of Transport and Storage systems, industry and power capture, pBECCS and hydrogen. The East Coast Cluster (ECC) Anchor Project comprises the initial CCUS Transport and Storage Company (Northern Endurance Partnership) and one emitter project (Net Zero Teeside) for one operational industrial CCUS cluster in the North East of England. It is planned that the anchor project will be followed by a series of Build Out projects. These will be crucial to the creation of a competitive CCUS market, supporting the UK's drive to legally binding Net Zero targets, and delivering economic benefits.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Section 43 - Commercial interests","startDate":null,"endDate":null,"scheduleNarrative":"Section 43 - Commercial interests","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 43 - Commercial interests","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Section 43 - Commercial interests","themes":["Commercial & supply chain"],"evidenceExcerpt":"Section 43 - Commercial interests Section 43 - Commercial interests","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":null,"transition":"Not comparable","endDateDeltaDays":null,"attentionScore":14,"attentionReasons":["In-year forecast variance is +43.0%"]},{"id":"CO_0027_2021-Q4","year":2026,"name":"Future Service Programme","department":"CO","category":"Information and Communications Technology (ICT)","description":"Exempt under Section 43 - Commercial interests","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 43 - Commercial interests","startDate":"2020-10-01","endDate":"2026-12-31","scheduleNarrative":"Exempt under Section 43 - Commercial interests","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Exempt under Section 43 - Commercial interests","themes":["Commercial & supply chain"],"evidenceExcerpt":"Exempt under Section 43 - Commercial interests Exempt under Section 43 - Commercial interests","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"CO_0027_2021-Q4","year":2022,"name":"Future Service Programme","department":"CO","category":"Government Transformation and Service Delivery","description":"The purpose of the programme is to put in place new administration models for the Civil Service Pension Scheme and the Royal Mail Statutory Pension Scheme. The new models will enable Ministers to meet their statutory duties to administer these schemes and will provide continuity of service to the two million scheme members. The strategic vision is to 'transform the Civil Service Pension Scheme into the best managed and administered UK public service pension scheme'.","ipaDca":"Green","sroDca":null,"deliveryConfidence":"Green","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 is Green The Programme is closely monitoring ongoing developments and will take appropriate action as needed. We are closely monitoring and will respond to any IPA feedback; and take action as needed.","startDate":"2020-10-01","endDate":"2024-12-31","scheduleNarrative":"Your project end-date is 31 DEC 2024. This is primarily due to the following factors: The programme is now fully in procurement. Progress includes the publishing of the SQ document and Contract Notice. As we have now fully entered procurement we are proactively focusing on planning our internal evaluation sessions, agreeing the evaluation criteria to be able to score evaluate and moderate potential bidders successfully and fairly. In parallel with this the programme is focusing on finalising service requirements and model services contract. Focus is currently on CSPS product however, initial activities have commenced in the RMSPS given the longer timescales for RMSPS ITT. For all key exercises the programme has initiated professional training for areas such as evaluation criteria, scoring mechanisms, TUPE and negotiation to ensure we have the correct knowledge to undertake the activities. In addition to this we are focusing on the next stage of planning around aligning key dependencies against the programme which may be impacted by transition and down selecting.","fyBaseline":1.6,"fyForecast":0.9,"fyVariance":-44.0,"varianceNarrative":"OBC has now received COAB approval. spend is down 44% from initial forecast following significant project work pushed forward into next year.","wholeLifeCost":243.0,"costNarrative":"Your projects Baseline Whole Life Cost is 243.20 (£m). This is primarily due to the following factors: The whole life cost remains the same as we are expecting the necessary project work planned for 21-22 to be carried forward into 22-23.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 is Green The Programme is closely monitoring ongoing developments and will take appropriate action as needed. We are closely monitoring and will respond to any IPA feedback; and take action as needed. Your project end-date is 31 DEC 2024. This is primarily due to the…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"CO_0027_2021-Q4","year":2023,"name":"Future Service Programme","department":"CO","category":"Government Transformation and Service Delivery","description":"Future Services Programme is a series of procurement and transformation projects within the Pension directorate of GPG. Key projects within the programme include The Civil Service Pension Scheme (CSPS) and the Royal Mail Statutory Pension Scheme (RMSPS). Ministers have a legal requirement to deliver administration services for the CSPS. MyCSP Ltd currently administers the CSPS under a contract with the Cabinet Office that will expire on 31 December 2023, although transitional protection clauses in the contract means that the current service can continue until December 2025. RMSPS services expires in September 2023 however a year long extension has been although transitional protection clauses in the contract means that the current service can continue for 2 years.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 decreased from Green (IPA rating) to Amber (SRO rating). This is primarily due to the following factors. Awaiting outcome of Gate 3 Review","startDate":"2020-10-01","endDate":"2025-12-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 increased from 2024-12-31 to 2025-12-31. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2024-12-31. This is primarily due to the following factors. Prject schedule has slipped due to extended time required on negotiations for CSPS","fyBaseline":1.6,"fyForecast":1.7,"fyVariance":6.0,"varianceNarrative":"Data already completed on GMPP","wholeLifeCost":null,"costNarrative":"NA The project did not provide data","benefits":11.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 11m. Benefits have been defined as part of the OBC and FBC which will be deleivered during transition. The final business case has been worked on and submitted to COAB for the July board part of which work will be done to revisit benefits identified within the early cost modelling stage to establish whether they are still relevant.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Technical & integration"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 decreased from Green (IPA rating) to Amber (SRO rating). This is primarily due to the following factors. Awaiting outcome of Gate 3 Review Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 increased from 2024-12-31 to 2025-12-31. This is…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"CO_0027_2021-Q4","year":2024,"name":"Future Service Programme","department":"CO","category":"Government Transformation and Service Delivery","description":"End of Year position - CSPS contract awarded 17/11/23. Transition commenced 08/12/23. RMSPS - going through approvals process. Contract expected to be awarded end of May 2024.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. Findings from the IPA Gate review (June 2023) surrounded programme resourcing. Including the continuity of the Programme Director, recruiting an Exit Manager to support exit of the incumbent supplier for the CS Pensions Scheme and implementation of succession planning. The programme has since secured the incumbent Programme Director until October 2025. An appointment was made for the Exit Manager but resigned a few days after their start date. Contingent Labour is being pursued to fulfil this role. On succession planning the Programme team is working with the wider Pension Directorate to develop a new Target Operating Model to support the ongoing delivery of the contract, including the definition of the capability requirement of staff and detailed plans on how to achieve this. A component of this model will be a detailed succession plan, utilising the capability model to identify talent and ensure processes are in place to develop these individuals.","startDate":"2020-10-01","endDate":"2024-12-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 decreased from 2025-12-31 to 2024-12-31. This is primarily due to the following factors. N/A","fyBaseline":6.4,"fyForecast":1.6,"fyVariance":-75.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The GMPP project did not provide narrative","wholeLifeCost":239.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 23/24-Q4 is 239m. This is primarily due to the following factors.","benefits":11.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 11m. Benefits identified at the OBC stage have been assessed and deemed to still be relevant. The potential cost savings are based upon the current contract costs and services performance, and present the potential opportunity to realise 82,585,174 over the life of the contract. However they will not be realised until Service Commencement, after the Transition has been completed. The establishment of the benefits realisation process will be a core part of transition activities. The Authority will work with Capita to develop and implement the detailed benefits delivery plan. This will include accurate baselines of the identified benefits, proposed targets and a supporting a delivery profile. Appropriate governance will be established within the Cabinet Office, including the utilisation of Gate 4 and Gate 5 IPA reviews to effectively monitor the delivery of benefits, and use appropriate levers within the contract to hold suppliers to account where this falls short. A key enabler to realising these benefits is the development of a Target Operating Model for the Authority which will define the operating structure and develop the capability to become a truly Intelligent Client. For maximum success this new TOM needs to be fully operational on Service Commencement date in Sept 2025","themes":["Cost & funding","Workforce & capability","Commercial & supply chain","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. Findings from the IPA Gate review (June 2023) surrounded programme resourcing. Including the continuity of the Programme Director, recruiting an Exit Manager to support exit…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"CO_0027_2021-Q4","year":2025,"name":"Future Service Programme","department":"CO","category":"ICT","description":"The purpose of the programme is to put in place new administration models for the Civil Service Pension Scheme and the Royal Mail Statutory Pension Scheme. The new models will enable Ministers to meet their statutory duties to administer these schemes and will provide continuity of service to the two million scheme members. The strategic vision is to 'transform the Civil Service Pension Scheme into the best managed and administered UK public service pension scheme","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ There are still significant challenges that the programme is addressing to ensure a successful transition CSPS Pensions Administration of services from MyCSP to Capita in December 2025. The contract with Capita was signed on the 17th November 2023 and the two year transition commenced on 8th December 2023. To ensure that the Cabinet Office was able to maximise the success of the complex transition of Services, a schedule of 12 Transition Milestones, each with defined deliverables and timescales, was negotiated and embedded within the Contract in Schedule 6.1 Transition Plan. Each Transition Milestone has payments associated with it which is documented in Schedule 7.1: Charges and Invoicing . Of the 6 Transition Milestones that Capita should have delivered by May 2025, 3 were late: - TM 4 was delivered 3rd June 2025 (original schedule date 30 Sept 24) - TM 6 was delivered 3rd June 2025 (original schedule date 31st April 24) - TM 5 is still to be delivered and the date is tbc (original schedule date 31st December 24) TM5 continues to be delayed due to some of the calculations not being on track for automation, as per the contractual requirements. Capita have provide Cabinet office with the detailed assessment of which Work Package 4 & 5 calculations will be run manually between December 2025 and March 2026, as well as providing CO with a details summary of the Scope of Day 1 (December 25) and Day 2 (March 26) delivery. Both of these products are being reviewed by Cabinet Office to ensure that there is no visible impact to Employers or members, and are scrutinising Capita resource plans to ensure that they have an appropriate level of FTEs to run the service with manual calculations for a short period of time. Furthermore due to internal delays within Capita's internal programme which is developing the core generic functionality for the Pension Administration Solution, CSPS will be adopting an duel release approach. The 1st release of functionality on 01/12/25 will ensure that we can move from MyCSP with a fully functional service. The 2nd release, scheduled for March 26, will delivery the remaining functionality which will meet the full contractual requirements. This effectively extends the transition by 3 months. However, Capital will begin running the CSPS service from 01/12/25 and will be required to adhere to all KPI and SLs outlined in Schedule 2.2 of the contract. The Cabinet office Programme Team are working closely with colleagues within the Markets Suppliers Team, Technical Design Authority and Security teams to ensure that, despite delays on some functionality, that implementation is technical sounds and secures the sensitive data set and retains significant commercial leverage over Capita to ensure that contract requirements are fulfilled. To ensure that The Programme is prepared for all eventualities, work on contingency options is underway, should there be any Red Lines (as defined by the Cabinet Office Minimum Viable Product) breached by Capita's delivery. All contingencies would be at the cost of Capita, as a liability clause up to the value of £60 million for failure to deliver transition within the 2 year window was negotiated into the contract.","startDate":"2020-10-01","endDate":null,"scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/12/2024 to 30/09/2026. This is primarily due to the following factors‚ The delivery schedule for CSPS Pensions Administration transfer is driven by the contractual obligations of the incoming supplier to delivery transition within a 2 year window. This window ends on 8th December 2025. Furthermore the Termination Assistance Period with the incumbent supplier, MyCSP comes to an end on 31st December 2025. Due to internal delays within Capita's internal programme which is developing the core generic functionality for the Pension Administration Solution, CSPS will be adopting an duel release approach. The 1st release of functionality on 01/12/25 will ensure that we can move from MyCSP with a fully functional service, which is prior to the end of the Termination Assistance Period. The 2nd release, scheduled for March 26, will delivery the remaining functionality which will meet the full contractual requirements. This effectively extends the transition by 3 months. However, Capital will begin running the CSPS service from 01/12/25 and will be required to adhere to all KPI and SLs outlined in Schedule 2.2 of the contract.","fyBaseline":21.5,"fyForecast":21.5,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%. Programme remains within budget variance as the contracts being delivered are a fixed price (including transition).","wholeLifeCost":239.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 239. This is primarily due to the following factors‚ Baseline Whole life cost for the programme Programme remains the same as the contracts being delivered are a fixed price (including transition).","benefits":11.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 11. This is primarily due to the following factors‚ Benefits Realisation Process is being designed and delivered as part of Transition. Benefits will be tracked once the Programme hands over to Service Commencement. Baselined Benefits as per the FBC remain the same.","themes":["Delivery & schedule","Cost & funding","Commercial & supply chain","Technical & integration"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ There are still significant challenges that the programme is addressing to ensure a successful transition CSPS Pensions Administration of services from MyCSP to…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"CO_0027_2021-Q4","year":2026,"name":"Future Service Programme","department":"CO","category":"Information and Communications Technology (ICT)","description":"Exempt under Section 43 - Commercial interests","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 43 - Commercial interests","startDate":"2020-10-01","endDate":"2026-12-31","scheduleNarrative":"Exempt under Section 43 - Commercial interests","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Exempt under Section 43 - Commercial interests","themes":["Commercial & supply chain"],"evidenceExcerpt":"Exempt under Section 43 - Commercial interests Exempt under Section 43 - Commercial interests","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"CO_0027_2021-Q4","year":2025,"name":"Future Service Programme","department":"CO","category":"ICT","description":"The purpose of the programme is to put in place new administration models for the Civil Service Pension Scheme and the Royal Mail Statutory Pension Scheme. The new models will enable Ministers to meet their statutory duties to administer these schemes and will provide continuity of service to the two million scheme members. The strategic vision is to 'transform the Civil Service Pension Scheme into the best managed and administered UK public service pension scheme","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ There are still significant challenges that the programme is addressing to ensure a successful transition CSPS Pensions Administration of services from MyCSP to Capita in December 2025. The contract with Capita was signed on the 17th November 2023 and the two year transition commenced on 8th December 2023. To ensure that the Cabinet Office was able to maximise the success of the complex transition of Services, a schedule of 12 Transition Milestones, each with defined deliverables and timescales, was negotiated and embedded within the Contract in Schedule 6.1 Transition Plan. Each Transition Milestone has payments associated with it which is documented in Schedule 7.1: Charges and Invoicing . Of the 6 Transition Milestones that Capita should have delivered by May 2025, 3 were late: - TM 4 was delivered 3rd June 2025 (original schedule date 30 Sept 24) - TM 6 was delivered 3rd June 2025 (original schedule date 31st April 24) - TM 5 is still to be delivered and the date is tbc (original schedule date 31st December 24) TM5 continues to be delayed due to some of the calculations not being on track for automation, as per the contractual requirements. Capita have provide Cabinet office with the detailed assessment of which Work Package 4 & 5 calculations will be run manually between December 2025 and March 2026, as well as providing CO with a details summary of the Scope of Day 1 (December 25) and Day 2 (March 26) delivery. Both of these products are being reviewed by Cabinet Office to ensure that there is no visible impact to Employers or members, and are scrutinising Capita resource plans to ensure that they have an appropriate level of FTEs to run the service with manual calculations for a short period of time. Furthermore due to internal delays within Capita's internal programme which is developing the core generic functionality for the Pension Administration Solution, CSPS will be adopting an duel release approach. The 1st release of functionality on 01/12/25 will ensure that we can move from MyCSP with a fully functional service. The 2nd release, scheduled for March 26, will delivery the remaining functionality which will meet the full contractual requirements. This effectively extends the transition by 3 months. However, Capital will begin running the CSPS service from 01/12/25 and will be required to adhere to all KPI and SLs outlined in Schedule 2.2 of the contract. The Cabinet office Programme Team are working closely with colleagues within the Markets Suppliers Team, Technical Design Authority and Security teams to ensure that, despite delays on some functionality, that implementation is technical sounds and secures the sensitive data set and retains significant commercial leverage over Capita to ensure that contract requirements are fulfilled. To ensure that The Programme is prepared for all eventualities, work on contingency options is underway, should there be any Red Lines (as defined by the Cabinet Office Minimum Viable Product) breached by Capita's delivery. All contingencies would be at the cost of Capita, as a liability clause up to the value of £60 million for failure to deliver transition within the 2 year window was negotiated into the contract.","startDate":"2020-10-01","endDate":null,"scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/12/2024 to 30/09/2026. This is primarily due to the following factors‚ The delivery schedule for CSPS Pensions Administration transfer is driven by the contractual obligations of the incoming supplier to delivery transition within a 2 year window. This window ends on 8th December 2025. Furthermore the Termination Assistance Period with the incumbent supplier, MyCSP comes to an end on 31st December 2025. Due to internal delays within Capita's internal programme which is developing the core generic functionality for the Pension Administration Solution, CSPS will be adopting an duel release approach. The 1st release of functionality on 01/12/25 will ensure that we can move from MyCSP with a fully functional service, which is prior to the end of the Termination Assistance Period. The 2nd release, scheduled for March 26, will delivery the remaining functionality which will meet the full contractual requirements. This effectively extends the transition by 3 months. However, Capital will begin running the CSPS service from 01/12/25 and will be required to adhere to all KPI and SLs outlined in Schedule 2.2 of the contract.","fyBaseline":21.5,"fyForecast":21.5,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%. Programme remains within budget variance as the contracts being delivered are a fixed price (including transition).","wholeLifeCost":239.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 239. This is primarily due to the following factors‚ Baseline Whole life cost for the programme Programme remains the same as the contracts being delivered are a fixed price (including transition).","benefits":11.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 11. This is primarily due to the following factors‚ Benefits Realisation Process is being designed and delivered as part of Transition. Benefits will be tracked once the Programme hands over to Service Commencement. Baselined Benefits as per the FBC remain the same.","themes":["Delivery & schedule","Cost & funding","Commercial & supply chain","Technical & integration"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ There are still significant challenges that the programme is addressing to ensure a successful transition CSPS Pensions Administration of services from MyCSP to…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":null,"transition":"Not comparable","endDateDeltaDays":null,"attentionScore":14,"attentionReasons":["In-year forecast variance is +43.0%"]},{"id":"BEIS_0233_2223-Q4","year":2026,"name":"GBE-N SMR Programme","department":"DESNZ","category":"Infrastructure and Construction","description":"The Small Modular Reactor (SMR) Programme is a major UK infrastructure initiative led by Great British Energy – Nuclear (GBE-N), established in 2023. It aims to develop and deploy a new fleet of small nuclear reactors to support energy security, provide reliable low-carbon electricity, and contribute to the UK’s transition to net zero. In June 2025, Rolls-Royce SMR was selected as the Preferred Bidder. Work on design, licensing and site development is underway this decade, with the first reactors expected to be operational in the mid-to-late 2030s. The programme focuses on selecting the right technology and securing suitable sites. GBE-N owns Oldbury and Wylfa, with Wylfa selected in November 2025, and is building the delivery capability needed to bring projects forward.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 43 - Commercial interests","startDate":null,"endDate":null,"scheduleNarrative":"Exempt under Section 43 - Commercial interests","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Exempt under Section 43 - Commercial interests","themes":["Commercial & supply chain"],"evidenceExcerpt":"Exempt under Section 43 - Commercial interests Exempt under Section 43 - Commercial interests","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"BEIS_0233_2223-Q4","year":2024,"name":"Great British Nuclear","department":"DESNZ","category":"Infrastructure and Construction","description":"Great British Nuclear (GBN) was set-up as HMG's new nuclear delivery body. GBN's first mandate is to take forward the SMR programme, launched in July 2023. The PBC is forecast to be approved in 2024. The SMR Programme is building block to support the wider nuclear programme - up to 24GW by 2050. The first phase of the SMR Programme focuses on enabling projects, which will be initiated through the following workstreams; Technology Selection: To run a competitive tender and down select to one or more potential technology partners - OBC approved in Feb 2024. Siting: To identify and secure access to sites for the allocation of selected technologies. SMR Programme Development: To set up GBN as an intelligent customer to oversee the management and delivery of the SMR Programme, including procurement and establishment of Devcos.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","startDate":"2023-07-01","endDate":"2029-12-21","scheduleNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","themes":["Commercial & supply chain"],"evidenceExcerpt":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests. Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"BEIS_0233_2223-Q4","year":2025,"name":"GREAT BRITISH NUCLEAR","department":"DESNZ","category":"Infrastructure and Construction","description":"Great British Nuclear (GBN) was set-up as HMG's new nuclear delivery body. GBN's first mandate is to take forward an SMR technology selection process, launched in July 2023. The SMR Programme seeks to contribute to wider nuclear, and the Government’s, energy security and net zero, goals. The SMR Programme includes the following workstreams: Technology Selection: To run a competitive tender and down select potential technology partner(s) - the selection process is currently in its final stage. Siting: To identify and secure access to sites for the allocation of selected technologies. SMR Programme Development: GBN to act an intelligent client to oversee the management and delivery (subject to funding decisions) of the SMR Programme, including establishment of DevCo capability to deliver project(s).","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Section 43 - Commercial interests","startDate":null,"endDate":null,"scheduleNarrative":"Section 43 - Commercial interests","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 43 - Commercial interests","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests, The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","benefits":null,"benefitsNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","themes":["Commercial & supply chain","Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Section 43 - Commercial interests Section 43 - Commercial interests","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"BEIS_0233_2223-Q4","year":2026,"name":"GBE-N SMR Programme","department":"DESNZ","category":"Infrastructure and Construction","description":"The Small Modular Reactor (SMR) Programme is a major UK infrastructure initiative led by Great British Energy – Nuclear (GBE-N), established in 2023. It aims to develop and deploy a new fleet of small nuclear reactors to support energy security, provide reliable low-carbon electricity, and contribute to the UK’s transition to net zero. In June 2025, Rolls-Royce SMR was selected as the Preferred Bidder. Work on design, licensing and site development is underway this decade, with the first reactors expected to be operational in the mid-to-late 2030s. The programme focuses on selecting the right technology and securing suitable sites. GBE-N owns Oldbury and Wylfa, with Wylfa selected in November 2025, and is building the delivery capability needed to bring projects forward.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 43 - Commercial interests","startDate":null,"endDate":null,"scheduleNarrative":"Exempt under Section 43 - Commercial interests","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Exempt under Section 43 - Commercial interests","themes":["Commercial & supply chain"],"evidenceExcerpt":"Exempt under Section 43 - Commercial interests Exempt under Section 43 - Commercial interests","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"BEIS_0233_2223-Q4","year":2025,"name":"GREAT BRITISH NUCLEAR","department":"DESNZ","category":"Infrastructure and Construction","description":"Great British Nuclear (GBN) was set-up as HMG's new nuclear delivery body. GBN's first mandate is to take forward an SMR technology selection process, launched in July 2023. The SMR Programme seeks to contribute to wider nuclear, and the Government’s, energy security and net zero, goals. The SMR Programme includes the following workstreams: Technology Selection: To run a competitive tender and down select potential technology partner(s) - the selection process is currently in its final stage. Siting: To identify and secure access to sites for the allocation of selected technologies. SMR Programme Development: GBN to act an intelligent client to oversee the management and delivery (subject to funding decisions) of the SMR Programme, including establishment of DevCo capability to deliver project(s).","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Section 43 - Commercial interests","startDate":null,"endDate":null,"scheduleNarrative":"Section 43 - Commercial interests","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 43 - Commercial interests","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests, The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","benefits":null,"benefitsNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","themes":["Commercial & supply chain","Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Section 43 - Commercial interests Section 43 - Commercial interests","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":null,"transition":"Not comparable","endDateDeltaDays":null,"attentionScore":14,"attentionReasons":["In-year forecast variance is +43.0%"]},{"id":"DESNZ_0457_2425-Q3","year":2026,"name":"HyNet Cluster","department":"DESNZ","category":"Infrastructure and Construction","description":"Overall, the CCUS programme will deliver a suite of business models and agreed revenue support ranges. These will underpin future private sector and Government investment in CCUS infrastructure (Power, Transport and Storage, Industry, and Hydrogen). This also includes the delivery of legal and regulatory frameworks to set risk/return profiles, rules, and guidance in relation to the use of Transport and Storage systems, industry and power capture, pBECCS and hydrogen. The HyNet Cluster comprises the Anchor, Padeswood and HyNet Build Out 2 projects, which together support the phased development of an industrial CCUS cluster in the Liverpool Bay area. The Anchor project establishes the core transport and storage infrastructure and initial capture projects, while Padeswood and HyNet Build Out 2 expand network utilisation through additional capture projects. Collectively, these projects support the development of a competitive CCUS market, contribute to the UK’s legally binding Net Zero targets, and deliver wider economic benefits.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 43 - Commercial interests","startDate":"2020-04-01","endDate":null,"scheduleNarrative":"Exempt under Section 43 - Commercial interests","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Exempt under Section 43 - Commercial interests","themes":["Commercial & supply chain"],"evidenceExcerpt":"Exempt under Section 43 - Commercial interests Exempt under Section 43 - Commercial interests","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"DESNZ_0457_2425-Q3","year":2025,"name":"HyNet Anchor","department":"DESNZ","category":"Infrastructure and Construction","description":"Overall, the CCUS programme will deliver a suite of business models and agreed revenue support ranges. These will underpin future private sector and Government investment in CCUS infrastructure (Power, Transport and Storage, Industry, and Hydrogen). This also includes the delivery of legal and regulatory frameworks to set risk/return profiles, rules, and guidance in relation to the use of Transport and Storage systems, industry and power capture, pBECCS and hydrogen. The HyNet Anchor Project comprises the initial CCUS Transport and Storage Company (ENI) and two emitter projects (Protos and Hydrogen Production Plant 1) for one operational industrial CCUS cluster in the Liverpool Bay area. It is planned that the anchor project will be followed by a series of Build Out projects. These will be crucial to the the creation of a competitive CCUS market, supporting the UK's drive to legally binding Net Zero targets, and delivering economic benefits.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Section 43 - Commercial interests","startDate":null,"endDate":null,"scheduleNarrative":"Section 43 - Commercial interests","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 43 - Commercial interests","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Section 43 - Commercial interests","themes":["Commercial & supply chain"],"evidenceExcerpt":"Section 43 - Commercial interests Section 43 - Commercial interests","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"DESNZ_0457_2425-Q3","year":2026,"name":"HyNet Cluster","department":"DESNZ","category":"Infrastructure and Construction","description":"Overall, the CCUS programme will deliver a suite of business models and agreed revenue support ranges. These will underpin future private sector and Government investment in CCUS infrastructure (Power, Transport and Storage, Industry, and Hydrogen). This also includes the delivery of legal and regulatory frameworks to set risk/return profiles, rules, and guidance in relation to the use of Transport and Storage systems, industry and power capture, pBECCS and hydrogen. The HyNet Cluster comprises the Anchor, Padeswood and HyNet Build Out 2 projects, which together support the phased development of an industrial CCUS cluster in the Liverpool Bay area. The Anchor project establishes the core transport and storage infrastructure and initial capture projects, while Padeswood and HyNet Build Out 2 expand network utilisation through additional capture projects. Collectively, these projects support the development of a competitive CCUS market, contribute to the UK’s legally binding Net Zero targets, and deliver wider economic benefits.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 43 - Commercial interests","startDate":"2020-04-01","endDate":null,"scheduleNarrative":"Exempt under Section 43 - Commercial interests","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Exempt under Section 43 - Commercial interests","themes":["Commercial & supply chain"],"evidenceExcerpt":"Exempt under Section 43 - Commercial interests Exempt under Section 43 - Commercial interests","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"DESNZ_0457_2425-Q3","year":2025,"name":"HyNet Anchor","department":"DESNZ","category":"Infrastructure and Construction","description":"Overall, the CCUS programme will deliver a suite of business models and agreed revenue support ranges. These will underpin future private sector and Government investment in CCUS infrastructure (Power, Transport and Storage, Industry, and Hydrogen). This also includes the delivery of legal and regulatory frameworks to set risk/return profiles, rules, and guidance in relation to the use of Transport and Storage systems, industry and power capture, pBECCS and hydrogen. The HyNet Anchor Project comprises the initial CCUS Transport and Storage Company (ENI) and two emitter projects (Protos and Hydrogen Production Plant 1) for one operational industrial CCUS cluster in the Liverpool Bay area. It is planned that the anchor project will be followed by a series of Build Out projects. These will be crucial to the the creation of a competitive CCUS market, supporting the UK's drive to legally binding Net Zero targets, and delivering economic benefits.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Section 43 - Commercial interests","startDate":null,"endDate":null,"scheduleNarrative":"Section 43 - Commercial interests","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 43 - Commercial interests","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Section 43 - Commercial interests","themes":["Commercial & supply chain"],"evidenceExcerpt":"Section 43 - Commercial interests Section 43 - Commercial interests","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":null,"transition":"Not comparable","endDateDeltaDays":null,"attentionScore":14,"attentionReasons":["In-year forecast variance is +43.0%"]},{"id":"MOD_0079_1213-Q1","year":2026,"name":"LIGHTNING PROGRAMME","department":"MOD","category":"Military Capability","description":"F-35B Lightning is a key element of Combat Air - a 5th Generation combat air vehicle with advanced sensors, mission systems and low observable technology. The F-35B provides real strategic opportunity, and its impressive capability has already been demonstrated and is recognised. It is jointly operated by the RAF and RN from both land and sea, with a main operating base at RAF Marham which currently houses 617 Squadron and 207 Squadron, the Operational Conversion Unit (OCU). The Lightning Force growth through delivering the second squadron, 809 NAS, at RAF Marham is a key dependency for the successful delivery of a critical Defence milestone of Carrier Strike capability.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 increased to GREEN. This is primarily due to the following factors. 1. The Initial Procurement Phase Full Operating Capability has been achieved, the benefits set out in the mandate have been delivered or are on track, and the Programme is now well positioned to transition responsibility to the Responsible Senior Owner and move into the Second Procurement Phase. 2. The GREEN rating was confirmed at Feb-26's Gateway Level 5 Review where the Review Team concluded that the Initial Procurement Phase of the UK’s F35 Lightning Programme had met its mandate and was ready for Graduation from the GMPP.","startDate":"2001-10-01","endDate":"2026-03-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 31/03/2026.","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Commercial & supply chain","Governance & assurance","Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 increased to GREEN. This is primarily due to the following factors. 1. The Initial Procurement Phase Full Operating Capability has been achieved, the benefits set out in the mandate have been delivered or are on track, and the Programme is now well…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"MOD_0079_1213-Q1","year":2020,"name":"Lightning Programme","department":"MOD","category":"Military Capability","description":"To deliver a multi-role, carrier-capable aircraft, to be operated jointly by the Royal Air Force and Royal Navy.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber, which has improved since last year�s Q2 1819 Amber/Red, due primarily to the following factors; - Significant activity across all of the Defence Lines Of Development took place in order to rectify issues with weapons' clearances, infrastructure completion at RAF Marham and Sovereign Data Manager for Autonomic Logistics Information System integration on to UK networks. This all enabled the declaration of Capability Milestone 1, Initial Operational Capability from Land, on schedule in Dec 18 . - Post Initial Operational Capability declaration, in June 19, the Lightning Force undertook their first overseas deployment in order to test logistics and support at range. Due to early success the Lightning Force were able to conduct their first operational missions from RAF Akrotiri in Cyprus in support of Operation SHADER. - Significant programme and pan-Defence Lines Of Development effort to effectively burn down provisos from Initial Operating Capability in order to deepen and sustain Initial Operational Capability also contributed to the improved picture maintaining significant momentum for this and future milestones. Since the Q2 1920 (30th September 2019) Amber IPA DCA, the following primary project actions have impacted the original Q2 IPA DCA; - Programme management alongside Lightning Delivery Team and Defence Lines Of Development Stakeholders conducted regular deep dives into any issues in order to develop path to resolution.","startDate":"2001-10-01","endDate":"2035-03-31","scheduleNarrative":"The scheduled baseline project end date at Q2 1920 (30th September 2019) is 31/03/35, has not changed since last year's Q2 1819 date of 31/03/35, due primarily to the following factors; - The project remains on schedule with no foreseeable issues likely to affect a successful outcome","fyBaseline":711.86,"fyForecast":750.37,"fyVariance":5.0,"varianceNarrative":"The 19/20 in-year baseline / forecast variance at Q2 1920 (30th September 2019) of 5%, is due primarily to the following factors; - During this reporting period there was significant ongoing work on the underlying Lightning Cost Model therefore Control Total (Budget) figures were held at an old 2018 position. As a result there was no change to the control total which would have allowed for an updated forecast - Forex and accounting treatments will also have contributed to this data. Since the Q2 1920 (30th September 2019) 19/20 in-year baseline / forecast variance of 5%, the following non-project operating environment activities have impacted the original Q2 19/20 in-year baseline / forecast variance; - Foreign Exchange fluctuations drove some variance into the Programme due to contracts being placed through the US Joint Programme Office. Since the Q2 1920 (30th September 2019) 19/20 in-year baseline / forecast variance of 5%, the following primary project actions have impacted the original Q2 19/20 in-year variance; - During this reporting period there was significant ongoing work on the underlying Lightning Cost Model therefore Control Total (Budget) figures were held at an old 2018 position. As a result there was no change to the control total which would have allowed for an updated forecast.","wholeLifeCost":10393.3,"costNarrative":"The baseline Whole Life Cost at Q2 1920 (30th September 2019) is �10,393.30 m, has decreased by �81.89 m since last year's Q2 1819 (�m) baseline Whole Life Cost of �10,475.19 m, due primarily to the following factors; - During 2019 significant work was done within the Lightning Delivery Team and Air Command Programme team in order to rework and revalidate the Lightning cost model, ensuring that core assumptions remained valid and any ambiguity was removed from the programme. This, along with work with the Joint Programme Office to mature costings data enabled realism factors to be applied leading to a reduction to whole life forecasts. Since the Q2 1920 (30th September 2019) �10,393.30 m baseline Whole Life Cost, the following non-project operating environment activities have impacted the original baseline Q2 Whole Life Cost; - Foreign Exchange fluctuations drive some variance into the Programme due to contracts being placed the US Joint Programme Office. Since the Q2 1920 (30th September 2019) �10,393.30 m baseline Whole Life Cost, the following primary project actions have impacted the original Q2 baseline Whole Life Cost; - During 2019 significant work was done within the Lightning Delivery Team and Air Command Programme team in order to rework and revalidate the cost model, ensuring that core assumptions remained valid and any ambiguity was removed from the programme. This, along with work with the Joint Programme Office to mature costings data, enabled realism factors to be applied leading to a reduction to whole life forecasts.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Technical & integration","Workforce & capability"],"evidenceExcerpt":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber, which has improved since last year�s Q2 1819 Amber/Red, due primarily to the following factors; - Significant activity across all of the Defence Lines Of Development took place in order to rectify issues with weapons' clearances, infrastructure completion at RAF…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2020","sourceLabel":"IPA Annual Report 2019-20"},{"id":"MOD_0079_1213-Q1","year":2021,"name":"Lightning Programme","department":"MOD","category":"Military Capability","description":"The intent of the Lightning Programme is the delivery of a multi-role, carrier-capable fighter aircraft, the Lockheed Martin F-35B Joint Strike Fighter, to be operated jointly by the Royal Air Force and Royal Navy. The F-35 provides the UK with a survivable, sustainable, expeditionary, Fifth Generation air capability in order to contribute to the widest possible range of operations. The Programme achieved Initial Operating Capability (Land) in December 2018, to deploy aircraft, held at Very High Readiness, from RAF Marham to a Deployed Operating Base and conduct an initial surge and enduring operation. In December 2020, Initial Operating Capability (Maritime) was declared to enable Lightning to deploy to a Queen Elizabeth Class Carrier and conduct operations from a land or sea base, contributing to the UK's Carrier Strike capability from this stage. Full Operating Capability (Concurrent Operations) will enable the full mass of the Lightning Force, including a second Front Line squadron, to deploy from RAF Marham to either a Deployed Operating Base and/or Queen Elizabeth Class Carrier to conduct an initial surge and enduring operation. Full Operating Capability (Concurrent Operations) is planned for December 2023, supporting the simultaneous Full Operating Capability (Carrier Strike) declaration.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating increased from Amber to Amber/red. This is primarily due to the following factors: Force Growth (sufficient numbers of trained and qualified personnel as well as aircraft) remains an issue and is being tracked and reported through quarterly Programme Boards. Funding approvals for the second Deployed Spares Pack and the second Front Line squadron (809 Naval Air Squadron) Infrastructure at RAF Marham are being sought for contract placement in the coming months to enable Full Operating Capability.","startDate":"2001-10-01","endDate":"2035-03-31","scheduleNarrative":"Compared to financial year 19/20-Q2, the project's end-date remained scheduled to finish on 31 March 2035 . This is primarily due to the following factors: the assumed end of F-35B production.","fyBaseline":700.04,"fyForecast":636.67,"fyVariance":-9.0,"varianceNarrative":"The budget variance exceeds 5%. The main driver for In-Year underspend comes from the recognition of income due from the global sales of F-35. This was enabled through the UK's investment, as a Tier 1 Partner, in the design and development of the capability. In addition, there were other minor movements that contributed to in-year underspend including review of project costs and accounting leading to the realisation of cost savings, favourable movement in the UK�:US$ exchange rate in the latter half of the Financial Year and refinement of the project's schedule and estimates, partly reflecting COVID impacts, led to a small reduction against planned expenditure.","wholeLifeCost":10164.26,"costNarrative":"Compared to financial year 19/20-Q2, the projects Baseline Whole Life Cost decreased from 10393.30m to �10164.26m. This is primarily due to the following factors: This is primarily due to the removal of erroneous foreign exchange approvals.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Workforce & capability","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating increased from Amber to Amber/red. This is primarily due to the following factors: Force Growth (sufficient numbers of trained and qualified personnel as well as aircraft) remains an issue and is being tracked and reported through quarterly…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21"},{"id":"MOD_0079_1213-Q1","year":2022,"name":"Lightning Programme","department":"MOD","category":"Military Capability","description":"F-35B Lightning II is a key element of Combat Air - a 5th generation combat air vehicle with advanced sensors, mission systems and low observable technology. Lightning provides real strategic opportunity, and its impressive capability has already been demonstrated and is recognised. It is jointly operated by the RAF and Royal Navy from both land and sea, with a main operating base at RAF Marham which currently houses 617 Squadron and 207 Squadron, the Operational Conversion Unit. T","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating decreased from Amber/Red to Red. This is primarily due to the following factors: Slow Force Growth which is preventing the Lightning Programme from delivering a 2nd Front-Line Squadron to the original planned timelines. As a compounding issue to Force Growth, Project ANVIL Phase 2 (the infrastructure for the 2nd Squadron at RAF Marham) is not yet affordable. The most recent IPA Gateway Assurance Review concluded the Lighting Programme had significant external influences outside of the Senior Responsible Officer's control.","startDate":"2001-10-01","endDate":"2048-03-30","scheduleNarrative":"Compared to 2021-Q4, the project end-date increased from 31 March 35 to 30 March 48. This is primarily due to the following factors: Correction to the previously published end to now reflect the approved Out of Service date. The programme needs to be re-baselined now that Lightning has reached a programmatic maturity where refinement of deliverable capability is required. Force Growth expectations, in particular, need to be reassessed in order to accurately understand what operational output date (e.g. two operational squadrons) might be achieved.","fyBaseline":894.58,"fyForecast":906.13,"fyVariance":1.0,"varianceNarrative":"The budget variance is inferior or equal to 5%.","wholeLifeCost":10414.0,"costNarrative":"Compared to 2021-Q4, the projects Baseline Whole Life Cost has increased by £249M (£10164.26M at Q4 20/21 to £10413.63M at Q4 21/22). This is primarily due to the following factors: Lightning is subject to incremental approvals as agreed in the Main Gate Business Case. Underlying cost growth due to inflationary pressures and refinement of cost estimates.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Governance & assurance","Approvals & decisions","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating decreased from Amber/Red to Red. This is primarily due to the following factors: Slow Force Growth which is preventing the Lightning Programme from delivering a 2nd Front-Line Squadron to the original planned timelines. As a compounding issue to…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"MOD_0079_1213-Q1","year":2023,"name":"Lightning Programme","department":"MOD","category":"Military Capability","description":"F-35B Lightning is a key element of Combat Air - a 5th Generation combat air vehicle with advanced sensors, mission systems and low observable technology. The F-35B provides real strategic opportunity, and its impressive capability has already been demonstrated and is recognised. It is jointly operated by the RAF and Royal Navy from both land and sea, with a main operating base at RAF Marham which currently houses 617 Squadron and 207 Squadron, the Operational Conversion Unit. The Lightning Force growth through delivering the second squadron, 809 NAS, at RAF Marham is a key dependency for the successful delivery of a critical Defence milestone of Carrier Strike capability.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 increased from Red (IPA rating) to Amber (SRO rating). This is primarily due to the following factors. Approval of an Outline Business Case has enabled ANVIL Phase 2 (the infrastructure for the 2nd Squadron at RAF Marham) to begin. This is a key enabling Project within the Programme. However Slow Force growth is preventing the Lightning Programme from delivering a 2nd Front-Line Squadron, now planned for 1 December 2023.","startDate":"2001-10-01","endDate":"2069-03-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 increased from 2048-03-30 to 2069-03-31. This is primarily due to the following factors. Future procurement of an additional 26 aircraft delivering a fleet of 74 which would allow the Out of Service Date of the aircraft to be extended to 2069 andalign with the QUEEN ELIZABETH class aircraft carrier Out of Service Date. Tranche 1, the initial phase of the Lightning Programme, is expected to achieve Full Operating Capability in late 2025, at which point the Lightning programme graduates to become Business as Usual.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This programme does not report cashable benefits. Its aim is to provision the armed forces with the equipment and / or infrastructure required.","themes":["Commercial & supply chain","Approvals & decisions","Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 increased from Red (IPA rating) to Amber (SRO rating). This is primarily due to the following factors. Approval of an Outline Business Case has enabled ANVIL Phase 2 (the infrastructure for the 2nd Squadron at RAF Marham) to begin. This is a key enabling Project…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"MOD_0079_1213-Q1","year":2024,"name":"Lightning Programme","department":"MOD","category":"Military Capability","description":"F-35B Lightning is a key element of Combat Air, a 5th Generation combat air vehicle with advanced sensors, mission systems and low observable technology. The F-35B provides real strategic opportunity, and its impressive capability has already been demonstrated and is recognised. It is jointly operated by the RAF and RN from both land and sea, with a main operating base at RAF Marham which currently houses 617 Squadron and 207 Squadron, the Operational Conversion Unit (OCU). The Lightning Force growth through delivering the second squadron, 809 NAS, at RAF Marham is a key dependency for the successful delivery of a critical Defence milestone of Carrier Strike capability.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The biggest ongoing risk to Full Operating Capability (FOC) is the provision of suitably qualified and experienced engineers to meet the operational workforce requirements. Successful delivery of FOC to time, cost and quality appears feasible but issues exist requiring management attention. These appear resolvable at this stage and, if addressed promptly, should not present a cost/schedule overrun.","startDate":"2001-10-01","endDate":"2025-12-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 decreased from 2069-03-31 to 2025-12-31. This is primarily due to the following factors. The programme previously reported the Out of Service Date of the aircraft in 2069 as the project end date. In accordance with IPA guidance, the end date now reflects the end of the Initial Procurement Phase.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":0.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 0m.","themes":["Commercial & supply chain","Cost & funding","Delivery & schedule","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The biggest ongoing risk to Full Operating Capability (FOC) is the provision of suitably qualified and experienced engineers to meet the operational workforce requirements.…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"MOD_0079_1213-Q1","year":2025,"name":"LIGHTNING PROGRAMME","department":"MoD","category":"Military Capability","description":"F-35B Lightning is a key element of Combat Air - a 5th Generation combat air vehicle with advanced sensors, mission systems and low observable technology. The F-35B provides real strategic opportunity and its impressive capability has already been demonstrated and is recognised. It is jointly operated by the RAF and RN from both land and sea, with a main operating base at RAF Marham which currently houses 617 Squadron and 207 Squadron, the Operational Conversion Unit (OCU). The Lightning Force growth through delivering the second squadron, 809 Naval Air Squadron at RAF Marham, is a key dependency for the successful delivery of a critical Defence milestone of Carrier Strike capability.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. The biggest ongoing risk to Full Operating Capability (FOC) and the principal reason for the continuing Amber rating remains the provision of suitably qualified and experienced engineers to meet the operational workforce requirements. Recruitment of additional engineers began in April 2023, although it will take time for all the extra personnel to be trained and gain the necessary experience. Aircrew numbers and the sustainment of the cyber workforce also present challenges to Force growth. Despite these concerns, a high degree of confidence remains that FOC will be delivered to the approved timescale.","startDate":"2001-10-01","endDate":"2026-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/12/2025 to 31/03/2026. This is primarily due to the following factors. The Lightning platforms reported Out of Service Date remains 2069 and the Lightning Full Operating Capability remains scheduled to be achieved no later than 31 Dec 2025. At the end of FY 2025/26 the first procurement phase will be complete with 48 F-35B aircraft delivered and two front-line squadrons operating.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 43 - Commercial interests","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Workforce & capability","Commercial & supply chain","Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. The biggest ongoing risk to Full Operating Capability (FOC) and the principal reason for the continuing Amber rating remains the provision of suitably qualified and experienced engineers to meet the…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"MOD_0079_1213-Q1","year":2026,"name":"LIGHTNING PROGRAMME","department":"MOD","category":"Military Capability","description":"F-35B Lightning is a key element of Combat Air - a 5th Generation combat air vehicle with advanced sensors, mission systems and low observable technology. The F-35B provides real strategic opportunity, and its impressive capability has already been demonstrated and is recognised. It is jointly operated by the RAF and RN from both land and sea, with a main operating base at RAF Marham which currently houses 617 Squadron and 207 Squadron, the Operational Conversion Unit (OCU). The Lightning Force growth through delivering the second squadron, 809 NAS, at RAF Marham is a key dependency for the successful delivery of a critical Defence milestone of Carrier Strike capability.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 increased to GREEN. This is primarily due to the following factors. 1. The Initial Procurement Phase Full Operating Capability has been achieved, the benefits set out in the mandate have been delivered or are on track, and the Programme is now well positioned to transition responsibility to the Responsible Senior Owner and move into the Second Procurement Phase. 2. The GREEN rating was confirmed at Feb-26's Gateway Level 5 Review where the Review Team concluded that the Initial Procurement Phase of the UK’s F35 Lightning Programme had met its mandate and was ready for Graduation from the GMPP.","startDate":"2001-10-01","endDate":"2026-03-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 31/03/2026.","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Commercial & supply chain","Governance & assurance","Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 increased to GREEN. This is primarily due to the following factors. 1. The Initial Procurement Phase Full Operating Capability has been achieved, the benefits set out in the mandate have been delivered or are on track, and the Programme is now well…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"MOD_0079_1213-Q1","year":2025,"name":"LIGHTNING PROGRAMME","department":"MoD","category":"Military Capability","description":"F-35B Lightning is a key element of Combat Air - a 5th Generation combat air vehicle with advanced sensors, mission systems and low observable technology. The F-35B provides real strategic opportunity and its impressive capability has already been demonstrated and is recognised. It is jointly operated by the RAF and RN from both land and sea, with a main operating base at RAF Marham which currently houses 617 Squadron and 207 Squadron, the Operational Conversion Unit (OCU). The Lightning Force growth through delivering the second squadron, 809 Naval Air Squadron at RAF Marham, is a key dependency for the successful delivery of a critical Defence milestone of Carrier Strike capability.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. The biggest ongoing risk to Full Operating Capability (FOC) and the principal reason for the continuing Amber rating remains the provision of suitably qualified and experienced engineers to meet the operational workforce requirements. Recruitment of additional engineers began in April 2023, although it will take time for all the extra personnel to be trained and gain the necessary experience. Aircrew numbers and the sustainment of the cyber workforce also present challenges to Force growth. Despite these concerns, a high degree of confidence remains that FOC will be delivered to the approved timescale.","startDate":"2001-10-01","endDate":"2026-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/12/2025 to 31/03/2026. This is primarily due to the following factors. The Lightning platforms reported Out of Service Date remains 2069 and the Lightning Full Operating Capability remains scheduled to be achieved no later than 31 Dec 2025. At the end of FY 2025/26 the first procurement phase will be complete with 48 F-35B aircraft delivered and two front-line squadrons operating.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 43 - Commercial interests","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Workforce & capability","Commercial & supply chain","Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. The biggest ongoing risk to Full Operating Capability (FOC) and the principal reason for the continuing Amber rating remains the provision of suitably qualified and experienced engineers to meet the…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":-1,"transition":"Improved","endDateDeltaDays":0,"attentionScore":14,"attentionReasons":["In-year forecast variance is +43.0%"]},{"id":"DHSC_0243_2324-Q1","year":2026,"name":"MODERNA STRATEGIC PARTNERSHIP PROGRAMME","department":"DHSC","category":"Government Transformation and Service Delivery","description":"Exempt under Section 43 - Commercial interests","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 43 - Commercial interests","startDate":"2022-12-20","endDate":null,"scheduleNarrative":"Exempt under Section 43 - Commercial interests","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Exempt under Section 43 - Commercial interests","themes":["Commercial & supply chain"],"evidenceExcerpt":"Exempt under Section 43 - Commercial interests Exempt under Section 43 - Commercial interests","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"DHSC_0243_2324-Q1","year":2024,"name":"Moderna Strategic Partnership Programme","department":"DHSC","category":"Government Transformation and Service Delivery","description":"Moderna/UK Strategic Partnership (MSP) is a short-medium term GMPP change programme, with the aim of creating the conditions for success across HM Government in which the 10-year partnership with Moderna can deliver benefits across the UK. This Moderna/UK Strategic Partnership enables: _x000D_ 1) Moderna's build of a UK mRNA manufacturing facility to supply mRNA vaccines _x000D_ 2) managing the UK health ecosystem to enable and maximise Moderna's investment in Research & Development _x000D_ 3) provision of greater vaccine resilience for the UK in the event of a pandemic or UK health emergency.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","startDate":null,"endDate":null,"scheduleNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","themes":["Commercial & supply chain"],"evidenceExcerpt":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests. Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"DHSC_0243_2324-Q1","year":2025,"name":"MODERNA STRATEGIC PARTNERSHIP PROGRAMME","department":"DHSC","category":"Infrastructure and Construction","description":"Section 43 - Commercial interests","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Section 43 - Commercial interests","startDate":"2022-12-22","endDate":null,"scheduleNarrative":"Section 43 - Commercial interests","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 43 - Commercial interests","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Section 43 - Commercial interests","themes":["Commercial & supply chain"],"evidenceExcerpt":"Section 43 - Commercial interests Section 43 - Commercial interests","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"DHSC_0243_2324-Q1","year":2026,"name":"MODERNA STRATEGIC PARTNERSHIP PROGRAMME","department":"DHSC","category":"Government Transformation and Service Delivery","description":"Exempt under Section 43 - Commercial interests","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 43 - Commercial interests","startDate":"2022-12-20","endDate":null,"scheduleNarrative":"Exempt under Section 43 - Commercial interests","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Exempt under Section 43 - Commercial interests","themes":["Commercial & supply chain"],"evidenceExcerpt":"Exempt under Section 43 - Commercial interests Exempt under Section 43 - Commercial interests","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"DHSC_0243_2324-Q1","year":2025,"name":"MODERNA STRATEGIC PARTNERSHIP PROGRAMME","department":"DHSC","category":"Infrastructure and Construction","description":"Section 43 - Commercial interests","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Section 43 - Commercial interests","startDate":"2022-12-22","endDate":null,"scheduleNarrative":"Section 43 - Commercial interests","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 43 - Commercial interests","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Section 43 - Commercial interests","themes":["Commercial & supply chain"],"evidenceExcerpt":"Section 43 - Commercial interests Section 43 - Commercial interests","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":null,"transition":"Not comparable","endDateDeltaDays":null,"attentionScore":14,"attentionReasons":["In-year forecast variance is +43.0%"]},{"id":"MOD_0047_1112-Q1","year":2026,"name":"SPEARFISH UPGRADE PROGRAMME","department":"MOD","category":"Military Capability","description":"The Spearfish Upgrade Programme will deliver in-service an upgraded submarine launched heavy-weight Torpedo that is safe, sustainable and capable of defeating modern Antisubmarine Warfare and Anti-Surface Warfare threats in order to retain the UK’s dominance of the Underwater Battlespace.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 24 - National security","startDate":"2008-04-01","endDate":null,"scheduleNarrative":"Exempt under Section 24 - National security","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Exempt under Section 43 - Commercial interests","themes":["Commercial & supply chain"],"evidenceExcerpt":"Exempt under Section 24 - National security Exempt under Section 24 - National security","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"MOD_0047_1112-Q1","year":2020,"name":"Spearfish Upgrade Programme","department":"MOD","category":"Military Capability","description":"To update the UK's submarine weapon systems. This includes improvements to the safety system to minimise residual risks and deliver improved performance against increasingly capable threats.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Red, which has declined since last year�s Q2 1819 Amber/Red, due primarily to the following factors; - Technical issues were encountered with the new weapon design during the submarine launched trial resulting in the trial being abandoned. The data from this trial was urgently required to support the ongoing technical investigation into weapon reliability and performance of the upgraded fibre-optic guidewire dispensing system. - The Weapon Thread project will deliver the submarine combat system upgrades that are necessary to deploy the new weapon. The schedule for delivery of these changes does not currently support a full transition to the upgraded weapon design before the old weapon design needs to be withdrawn from service. - Under the forecasted schedule for the Weapon Thread project the in-service conversion plan that will allow transition from the old weapon design to the new weapon design will place an extreme stress on the operational availability and reserve stockpile levels of the Spearfish Heavy Weight Torpedo. Since the Q2 1920 (30th September 2019) Red IPA DCA, the following non-project operating environment activities have impacted the original Q2 IPA DCA; - At this point the trials programme for the new weapon was dependent on submarine and surface asset availability and, given the operational demand for these assets, it was increasingly difficulty to successfully co-ordinate trials with RN platform availability. Since September 2019 a trials strategy has been developed that mitigates this dependency. Since the Q2 1920 (30th September 2019) Red IPA DCA, the following primary project actions have impacted the original Q2 IPA DCA; - Confidence in the weapon design, especially the fibre-optic dispensing system, has increased significantly following improvements in the manufacturing process, further shore-based testing and a successful repeat of Boat Trial 2. The weapon design has now been frozen and future trials are planned to improve the statistical confidence in weapon reliability. - An agreed safety case for the Weapon Thread Minimum Operating Capability design and completion of the Critical Design Review is required to progress through testing to manufacture. This has been the main effort of the Weapon thread team for several months and although not yet complete has progressed significantly.","startDate":"2008-04-01","endDate":"2024-03-31","scheduleNarrative":"The scheduled baseline project end date at Q2 1920 (30th September 2019) is 31/03/24, has not changed since last year's Q2 1819 date of 31/03/24, due primarily to the following factors; - Delivery of the upgraded weapon was subject to review due to the technical encountered during trials, however, it was still forecast to be significantly earlier than the date required to support operational use following platform conversion under Weapon Thread and therefore the overall forecast end date remained unchanged. - The Submarine Combat System upgrades are the key driver for the baseline end date. Delivery of these upgrades are expected to push the boundary of the existing MOD0 weapon life, which has become the de facto programme end date and this is relatively inflexible as it driven by weapon safety. Since the Q2 1920 (30th September 2019) baseline project end date of 31/03/24, the following primary project actions have impacted the original Q2 baseline project end date; - The in-water trials programme has now been decoupled from the availability of RN assets and plans for an overseas trial removed from the Critical Path. This will allow MOD to renegotiate a commercial position with the Prime contractor and to progress through the demonstration phase to full manufacture. - Since Q219/20 fourteen enterprise wide workshops have taken place working towards a whole-boat safety case for submarine intrinsic and dynamic safety when employing the MOD1 weapon design. Although this work is still ongoing significant progress has been made and critically no changes are anticipated to the current design.","fyBaseline":37.68,"fyForecast":35.32,"fyVariance":-6.0,"varianceNarrative":"The 19/20 in-year baseline / forecast variance at Q2 1920 (30th September 2019) of -6%, is due primarily to the following factors; - The in-year baseline costs for the Spearfish Programme included manufacturing and operational costs for the conduct of a number of in-water demonstration trials, including one very significant cost to conduct an overseas trial. Due to a combination of technical issues and RN Platform availability these trials were delayed. - During FY19/20 Navy Command requested DE&S to investigate potential savings measures to improve the Top Level Budget in-year Control Total position. The Spearfish Upgrade Project Team identified the costs allocated to the delayed in-water trials, offering to reprofile these costs into later years when these trials could be completed. Since the Q2 1920 (30th September 2019) 19/20 in-year baseline / forecast variance of -6%, the following primary project actions have impacted the original Q2 19/20 in-year variance; - No actions were necessary to recover the variance. As it was not be possible to complete the trials associated with these costs within year, Navy Command agreed a position to reprofile the costs into later years, which also alleviated the Top Level Budget Control Total position.","wholeLifeCost":414.52,"costNarrative":"The baseline Whole Life Cost at Q2 1920 (30th September 2019) is �414.52 m, has increased by �0.63 m since last year's Q2 1819 (�m) baseline Whole Life Cost of �413.89 m, due primarily to the following factors; - The extremely marginal increase (0.15%) in whole-life costs was due to an increase in the number of weapons required for in-water trials during the demonstration phase. These additional firings were requested by MOD to provide increased statistical confidence in the reliability and performance of the new weapon design. - It has not been possible to identify more than one factor driving such a marginal (0.15%) increase in whole life costs. Since the Q2 1920 (30th September 2019) �414.52 m baseline Whole Life Cost, the following primary project actions have impacted the original Q2 baseline Whole Life Cost; - The overall whole life costs for the Spearfish Upgrade Project have remain stable. This has been due pro-active management by the Project Team who have identified opportunities to reduce costs in some areas, in order to support emergent requirements and a demand for an increased number of in-water firings.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Scope & requirements","Delivery & schedule","Technical & integration"],"evidenceExcerpt":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Red, which has declined since last year�s Q2 1819 Amber/Red, due primarily to the following factors; - Technical issues were encountered with the new weapon design during the submarine launched trial resulting in the trial being abandoned. The data from this trial was…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2020","sourceLabel":"IPA Annual Report 2019-20"},{"id":"MOD_0047_1112-Q1","year":2021,"name":"Spearfish Upgrade Programme","department":"MOD","category":"Military Capability","description":"To deliver into service an upgraded submarine launched heavy-weight Torpedo that is safe, sustainable and capable of defeating modern Anti-Submarine Warfare and Anti-Surface Warfare threats in order to retain the UK's dominance of the Underwater Battlespace.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating decreased from Red to Amber. This is primarily due to the following factors: 1. Confidence has improved in the solution to a previous technical issue with the modified weapon as part of the Spearfish Upgrade�Projects. Successful Development Phase trials of the weapon have been conducted leading to acceptance of the final design. The Equipment Delivery Date for the Spearfish Upgrade�weapon was achieved on 31 March 2021 and an Initial Operating Capability declared; this included the delivery of the initial set of weapon modification sets and putting into place the logistic support arrangements. 2. Transition Plan activities to modify the existing stock of Spearfish Mod 0 weapons into Spearfish Upgrade weapons remains on target to meet the required delivery schedule. 3. The rating is no better than Amber owing to the continuing risk that the Submarine Combat System upgrade (Weapon Thread Project) will not deliver in time to match the rollout schedule of the Spearfish Upgrade weapons. The Weapon Thread project is on track to deliver on time but with no margin for delay remains within the Programme schedule. This defines the critical path to successful completion of the Programme.","startDate":"2008-04-01","endDate":"2024-03-31","scheduleNarrative":"Compared to financial year 19/20-Q2, the project's end-date remained scheduled to finish on 31 March 2024 . This is primarily due to the following factors: The Programme will end when all stock of Spearfish Mod 0 weapons have been converted to Spearfish Upgrade Project and when all operational submarines (not including those in Build or in Deep Maintenance Periods) have received the Weapon Thread upgrade to their Combat Systems. Delivery of the Weapon Thread upgrade to submarines in Build and Deep Maintenance Periods will be conducted as Business as Usual beyond the scope of the Programme. The change to the forecast Programme end-date has been driven by the risk of schedule delay to the delivery of the Weapon Thread Project and the need to match the installation of the Combat System upgrades to the Submarine Support and Maintenance Programme. It is not possible to slow the Transition Plan of Spearfish Upgrade weapon conversion to match any further delay to the delivery of the Weapon Thread Project owing to the life expiry date of the Spearfish Mod 0 weapons.","fyBaseline":93.98,"fyForecast":81.29,"fyVariance":-14.0,"varianceNarrative":"The budget variance exceeds 5%. Variance of �-12.688m (-14%). The programme current costing for 20/21 fell below the control total for the following reasons: . The programme has seen savings that were made during the recent contract negotiations alongside the recycling of torpedo fuel. There has also been some re-programming of activities on the Torpedoes contract which has led to some movement of activities into later years. . Application of realism to risk inside costing in Weapon Thread project.","wholeLifeCost":860.0,"costNarrative":"Compared to financial year 19/20-Q2, the projects Baseline Whole Life Cost increased from �414.52m to �860.00m. This is primarily due to the following factors: Whole Life Costs for the Spearfish Programme (when all stock of Spearfish Mod 0 weapons have been converted to Spearfish Mod 1 weapons and when all operational submarines (not including those in Build or in Deep Maintenance Periods) have received the Weapon Thread upgrade to their Combat Systems) is �860m. This includes the Spearfish Upgrade Project, Weapon Thread Project, and Project Whitehead/Torps In-Service Support. Estimated Whole Life Cost to maintain Mod 1 capability to 2060 is �1.6B.�","benefits":null,"benefitsNarrative":"","themes":["Delivery & schedule","Cost & funding","Commercial & supply chain","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating decreased from Red to Amber. This is primarily due to the following factors: 1. Confidence has improved in the solution to a previous technical issue with the modified weapon as part of the Spearfish Upgrade�Projects. Successful Development…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21"},{"id":"MOD_0047_1112-Q1","year":2022,"name":"Spearfish Upgrade Programme","department":"MOD","category":"Military Capability","description":"To deliver in-service an upgraded submarine launched heavy-weight Torpedo that is safe, sustainable and capable of defeating modern Anti-Submarine Warfare and Anti-Surface Warfare threats in order to retain the UK's dominance of the Underwater Battlespace.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber. This is primarily due to the following factors: The continued technical challenges with the weapon design which have led to a 6-month delay in warshot weapon manufacture. However, work is ongoing to maintain the schedule and at this point the in-Service date currently remains unchanged","startDate":"2008-04-01","endDate":"2024-03-31","scheduleNarrative":"Compared to 2021-Q4, the project end-date remained scheduled to finish on 31 March 24. This is primarily due to the following factors:","fyBaseline":37.23,"fyForecast":35.33,"fyVariance":-5.0,"varianceNarrative":"The budget variance is inferior or equal to 5%.","wholeLifeCost":406.0,"costNarrative":"Compared to 2021-Q4, the projects baseline Whole Life Cost decreased from 406.50(£m) to 406.46 (£m). This is primarily due to the following factors: The revised Whole Life Costs remain within tolerable limits","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Scope & requirements","Technical & integration"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber. This is primarily due to the following factors: The continued technical challenges with the weapon design which have led to a 6-month delay in warshot weapon manufacture. However, work is ongoing to maintain the schedule and…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"MOD_0047_1112-Q1","year":2023,"name":"Spearfish Upgrade Programme","department":"MOD","category":"Military Capability","description":"To deliver in-service an upgraded submarine launched heavy-weight Torpedo that is safe, sustainable and capable of defeating modern Anti-Submarine Warfare and Anti-Surface Warfare threats in order to retain the UK's dominance of the Underwater Battlespace.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. The continued challenges to the schedule imposed by both technical complexity and changes to fit opportunities to the submarine platforms.","startDate":"2008-04-01","endDate":"2024-03-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2024-03-31. This is primarily due to the following factors. Despite significant progress, the continued technical, industrial and supply chain challenges faced by the programme still threaten the feasibility of programme schedule.","fyBaseline":31.41,"fyForecast":30.27,"fyVariance":-4.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":405.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 decreased from 406m. to 405m. This is primarily due to the following factors. A Foreign exchange variance and a double counted accrual which has been removed.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This programme does not report cashable benefits. Its aim is to provision the armed forces with the equipment and / or infrastructure required.","themes":["Cost & funding","Delivery & schedule","Technical & integration","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. The continued challenges to the schedule imposed by both technical complexity and changes to fit opportunities to the submarine platforms. Compared to financial year…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"MOD_0047_1112-Q1","year":2024,"name":"Spearfish Upgrade Programme","department":"MOD","category":"Military Capability","description":"To deliver in-service an upgraded submarine launched heavy-weight Torpedo that is safe, sustainable and capable of defeating modern Anti-Submarine Warfare and Anti-Surface Warfare threats in order to retain the UK’s dominance of the Underwater Battlespace.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure and Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remains at Amber. This is primarily due to the following factors. Delivery progress made to date balanced against the technical complexity of the programme and its dependencies on the submarine upkeep programme. On advice from the recent Infrastructure and Projects Authority Gateway Review, the Spearfish Upgrade Programme End-date milestone has been amended to reflect the Delivery Confidence Assessment of the entire programme rather than that of only one of the three projects which the Spearfish Upgrade Programme is dependent upon.","startDate":"2008-04-01","endDate":"2025-03-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 increased from 2024-03-31 to 2025-03-31. This is primarily due to the following factors. Following advice from a recent IPA Gateway Review, the Spearfish Upgrade Programme End-date milestone has been amended so that it now reflects the closure of the Spearfish Upgrade Programme through delivery by the constituent three projects, rather than being limited to just the Spearfish Upgrade Programme Weapon project. Adjustment of this milestone is purely administrative to ensure reporting is aligned with the previous and most recent Infrastructure and Projects Authority Gateway Review.","fyBaseline":86.84,"fyForecast":68.46,"fyVariance":-21.165,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. In year variance to budget due to delays within subcontractors delivery. The Spearfish Upgrade project milestone payment has moved into next FY reflecting delays in delivery of the Spearfish Upgrade Programme Mod Kits. Since the previous Transparency report, the Programme has been directed to include the financial details for Weapon Thread and Whitehead to encompass the full programme, which is also reflected in the variance.","wholeLifeCost":1402.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 increased from 405m to 1402m. This is primarily due to the following factors. The inclusion of Weapon Thread project and Torpedo In-Service Support costs in this quarter's report as directed by the Infrastructure and Projects Authority Gateway Review. These additional projects have their own centrally approved business cases and Approved Budgetary Levels and are managed accordingly. The Torpedo In-Service Support costs reported are indicative owing to the commercial arrangements involved and include disposal costs for Spearfish Mod 0 until 2028. Through Life costs for Spearfish Mod 1 past 2028 are a planning assumption for a commercial programme currently in the `Identify` stage.","benefits":0.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 0m.","themes":["Delivery & schedule","Cost & funding","Governance & assurance","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure and Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remains at Amber. This is primarily due to the following factors. Delivery progress made to date balanced against the technical complexity of the programme and its dependencies on the submarine upkeep programme. On advice from…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"MOD_0047_1112-Q1","year":2025,"name":"SPEARFISH UPGRADE PROGRAMME","department":"MoD","category":"Military Capability","description":"To deliver in-service an upgraded submarine launched heavy-weight Torpedo that is safe, sustainable and capable of defeating modern Anti-Submarine Warfare and Anti-Surface Warfare threats in order to retain the UK’s dominance of the Underwater Battlespace.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Section 24 - National security","startDate":"2008-04-01","endDate":null,"scheduleNarrative":"Section 24 - National security","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 43 - Commercial interests","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Section 24 - National security","themes":["Commercial & supply chain"],"evidenceExcerpt":"Section 24 - National security Section 24 - National security","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"MOD_0047_1112-Q1","year":2026,"name":"SPEARFISH UPGRADE PROGRAMME","department":"MOD","category":"Military Capability","description":"The Spearfish Upgrade Programme will deliver in-service an upgraded submarine launched heavy-weight Torpedo that is safe, sustainable and capable of defeating modern Antisubmarine Warfare and Anti-Surface Warfare threats in order to retain the UK’s dominance of the Underwater Battlespace.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 24 - National security","startDate":"2008-04-01","endDate":null,"scheduleNarrative":"Exempt under Section 24 - National security","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Exempt under Section 43 - Commercial interests","themes":["Commercial & supply chain"],"evidenceExcerpt":"Exempt under Section 24 - National security Exempt under Section 24 - National security","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"MOD_0047_1112-Q1","year":2025,"name":"SPEARFISH UPGRADE PROGRAMME","department":"MoD","category":"Military Capability","description":"To deliver in-service an upgraded submarine launched heavy-weight Torpedo that is safe, sustainable and capable of defeating modern Anti-Submarine Warfare and Anti-Surface Warfare threats in order to retain the UK’s dominance of the Underwater Battlespace.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Section 24 - National security","startDate":"2008-04-01","endDate":null,"scheduleNarrative":"Section 24 - National security","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 43 - Commercial interests","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Section 24 - National security","themes":["Commercial & supply chain"],"evidenceExcerpt":"Section 24 - National security Section 24 - National security","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":null,"transition":"Not comparable","endDateDeltaDays":null,"attentionScore":14,"attentionReasons":["In-year forecast variance is +43.0%"]},{"id":"BEIS_0019_2122-Q1","year":2026,"name":"Sizewell C Project","department":"DESNZ","category":"Infrastructure and Construction","description":"Exempt under Section 43 - Commercial interests","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 43 - Commercial interests","startDate":null,"endDate":null,"scheduleNarrative":"Exempt under Section 43 - Commercial interests","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Exempt under Section 43 - Commercial interests","themes":["Commercial & supply chain"],"evidenceExcerpt":"Exempt under Section 43 - Commercial interests Exempt under Section 43 - Commercial interests","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"BEIS_0019_2122-Q1","year":2022,"name":"Sizewell C","department":"BEIS","category":"Infrastructure and Construction","description":"The Sizewell C (SZC) project team will lead on negotiations with SZC and EDF (its main shareholder) and will have responsibility for designing a viable funding/financing model that delivers the Government objectives of value for money, fiscal responsibility, and decarbonisation. EDF's planned project in Suffolk - Sizewell C - is considered the most advanced new nuclear project in the UK and is likely to be the only project capable of delivering the Energy White Paper objective for at least one large scale nuclear project to reach Final Investment Decision (FID) this Parliament.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","startDate":"2021-01-01","endDate":"2023-04-21","scheduleNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"","themes":["Commercial & supply chain"],"evidenceExcerpt":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests. Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"BEIS_0019_2122-Q1","year":2023,"name":"Sizewell C","department":"DESNZ","category":"Infrastructure and Construction","description":"The Sizewell C (SZC) project team will lead on negotiations with SZC and EDF (joint shareholder in the project with Government) and will have responsibility for designing a viable funding/financing model that delivers the Government objectives of value for money, fiscal responsibility, and decarbonisation. The Sizewell C project in Suffolk is considered the most advanced new nuclear project in the UK and is likely to be the only project capable of delivering the Energy White Paper objective for at least one large scale nuclear project to reach Final Investment Decision (FID) this Parliament.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","startDate":"2021-01-01","endDate":null,"scheduleNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","themes":["Commercial & supply chain"],"evidenceExcerpt":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests. Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"BEIS_0019_2122-Q1","year":2024,"name":"Sizewell C","department":"DESNZ","category":"Infrastructure and Construction","description":"The Sizewell C (SZC) project team will lead on negotiations with SZC and EDF (joint shareholder in the project with Government) and will have responsibility for designing a viable funding/financing model that delivers the Government objectives of value for money, fiscal responsibility, and decarbonisation. The Sizewell C project in Suffolk is considered the most advanced new nuclear project in the UK and is likely to be the only project capable of delivering the Energy White Paper objective for at least one large scale nuclear project to reach Final Investment Decision (FID) this Parliament. Please note that Sizewell C Project has requested an exemption due to commercial interests.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","startDate":null,"endDate":null,"scheduleNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","themes":["Commercial & supply chain"],"evidenceExcerpt":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests. Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"BEIS_0019_2122-Q1","year":2025,"name":"NEW NUCLEAR PROJECT (SIZEWELL C)","department":"DESNZ","category":"Infrastructure and Construction","description":"Section 43 - Commercial interests","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Section 43 - Commercial interests","startDate":null,"endDate":null,"scheduleNarrative":"Section 43 - Commercial interests","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 43 - Commercial interests","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Section 43 - Commercial interests","themes":["Commercial & supply chain"],"evidenceExcerpt":"Section 43 - Commercial interests Section 43 - Commercial interests","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"BEIS_0019_2122-Q1","year":2026,"name":"Sizewell C Project","department":"DESNZ","category":"Infrastructure and Construction","description":"Exempt under Section 43 - Commercial interests","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 43 - Commercial interests","startDate":null,"endDate":null,"scheduleNarrative":"Exempt under Section 43 - Commercial interests","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Exempt under Section 43 - Commercial interests","themes":["Commercial & supply chain"],"evidenceExcerpt":"Exempt under Section 43 - Commercial interests Exempt under Section 43 - Commercial interests","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"BEIS_0019_2122-Q1","year":2025,"name":"NEW NUCLEAR PROJECT (SIZEWELL C)","department":"DESNZ","category":"Infrastructure and Construction","description":"Section 43 - Commercial interests","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Section 43 - Commercial interests","startDate":null,"endDate":null,"scheduleNarrative":"Section 43 - Commercial interests","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 43 - Commercial interests","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Section 43 - Commercial interests","themes":["Commercial & supply chain"],"evidenceExcerpt":"Section 43 - Commercial interests Section 43 - Commercial interests","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":null,"transition":"Not comparable","endDateDeltaDays":null,"attentionScore":14,"attentionReasons":["In-year forecast variance is +43.0%"]},{"id":"MOD_0110_1718-Q1","year":2026,"name":"MODNET EVOLVE","department":"MOD","category":"Information and Communications Technology (ICT)","description":"MODNET Evolve provides the essential base IT infrastructure needed by the MOD at OFFICIAL and SECRET on exit from the 20 year legacy contract with the ATLAS consortium. It achieves independence from major monolithic IT contracts by disaggregating them into components, and driving better value for money by exploiting the increasing commoditisation of modern IT services. Additionally, the associated ‘in-housing’ of key IT management capabilities enables MOD to control its IT design, providing the basis for a single enterprise architecture that will meet the MOD's evolving business needs.","ipaDca":"Green","sroDca":null,"deliveryConfidence":"Green","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 increased to Green. This is primarily due to the following factors. 1. The completion of the migration of all 180,000 OFFICIAL Tier users worldwide to the new MODNET OFFICIAL service, the completion of the migration of the 20,000 SECRET Tier users worldwide to the new MODNET SECRET service, and the planned closure of the programme by July 2026.","startDate":"2016-02-29","endDate":"2026-07-31","scheduleNarrative":"Compared to financial year 24/25-Q4 the programme's end date at 25/26-Q4 remained the same at 31/07/2026.","fyBaseline":30.39,"fyForecast":42.05,"fyVariance":38.37,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. 1. Reflects a forecast over-spend against budget of £12.037M and is primarily due to the revised delivery schedule for the OFFICIAL Tier, which resulted in legacy services continuing for a further 2 months.","wholeLifeCost":309.19,"costNarrative":"Compared to financial year 24/25-Q4, the projects departmental-agreed forecast Whole Life Cost at 25/26-Q4 (measured in £m) decreased from £370.68M to £262.10M. This is primarily due to the following factors. 1. Three projects have been transferred from the core MODNET Evolve change programme to the respective System Owners who are responsible for runing and introducng routine updates to the platforms.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmental-agree monetised benefits at 25/26-Q4 remained at 0m","themes":["Cost & funding","Delivery & schedule","Technical & integration","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 increased to Green. This is primarily due to the following factors. 1. The completion of the migration of all 180,000 OFFICIAL Tier users worldwide to the new MODNET OFFICIAL service, the completion of the migration of the 20,000 SECRET Tier users…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"MOD_0110_1718-Q1","year":2020,"name":"MODnet Evolve","department":"MOD","category":"ICT","description":"Sustain OFFICIAL and SECRET Information Communications and Technology (ICT) services in the Base and Base Overseas environments from the end of the ATLAS New Style of IT (Base) (NSOIT(B)) contract.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber/Red, which has not changed since last year�s Q2 1819 Amber/Red, due primarily to the following factors; - The MODNet Evolve Programme has been impacted by Departmental spend control measures that resulted in the pause of several of its Projects until Apr 2020. A Review Note to the Defence Investment Approvals Committee will re-set the Programme by Sep 2020. - The MODNet Evolve Programme continues to have a heavy reliance on contracted support though an improved position has been achieved through the implementation of the Defence Digital resource strategy this is not expected to address the current imbalance until late in 2020. Since the Q2 1920 (30th September 2019) Amber/Red IPA DCA, the following primary project actions have impacted the original Q2 IPA DCA; - Defence Digital has implemented a MODNet Evolve Resource strategy that is addressing the Programmes heavy reliance on contracted support. - The MODNet Evolve Programme has raised a Review Note to the MOD Investment Approvals Committee to address the change driven by the Departmental spend control measures implemented in Nov 2019.","startDate":"2016-02-29","endDate":"2021-09-01","scheduleNarrative":"The scheduled baseline project end date at Q2 1920 (30th September 2019) is 01/09/21, has shortened by 313 days since last year's Q2 1819 date of 11/07/22, due primarily to the following factors; - The dates presented in Q2 18/19 related to the end of Transition from the current contract to new services. Dates presented in Q2 19/20 relate to a contract award date and do not represent the Programme end date. Since the Q2 1920 (30th September 2019) baseline project end date of 01/09/21, the following non-project operating environment activities have impacted the original Q2 baseline project end date; - The MODNet Evolve Programme has been impacted by Departmental spend control measures that resulted in the pause of three of its Projects until Apr 2020. This has delayed the procurement activity of three of the Projects within the Programme, Managed Print, Records management and Productivity and collaboration. The pause has required the programme to raise a Review Note to bring the projects back within their approvals.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests)","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests)","benefits":null,"benefitsNarrative":"","themes":["Commercial & supply chain","Approvals & decisions","Cost & funding","Governance & assurance"],"evidenceExcerpt":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber/Red, which has not changed since last year�s Q2 1819 Amber/Red, due primarily to the following factors; - The MODNet Evolve Programme has been impacted by Departmental spend control measures that resulted in the pause of several of its Projects until Apr 2020. A…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2020","sourceLabel":"IPA Annual Report 2019-20"},{"id":"MOD_0110_1718-Q1","year":2021,"name":"MODnet Evolve","department":"MOD","category":"ICT","description":"MODNET Evolve will sustain the essential base Information and Communications Technology infrastructure needed by the Ministry of Defence on exit from the current contract.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber/red. This is primarily due to the following factors: The Skills, Capability and complexity of Dependencies across the Programme results in a Delivery Confidence assessment being held at Amber/Red. The resourcing of the Future Secret project remains a risk, but the approval of the Strategic Outline Case will help address this early in the next quarter. A number of successes have occurred across the Programme in this reporting period: Approval of the Strategic Outline Case for Future Secret; Release of the Invitation to Negotiate for End User Services; and an Invitation to Tender for Managed Print and Electronic Records Management. COVID-19 - Has not impacted the MODNet Evolve main delivery however it is presenting challenges to the Future Operations Service Management delivery.","startDate":"2011-01-01","endDate":"2026-11-30","scheduleNarrative":"Compared to financial year 19/20-Q2, the project's end-date increased from 11 July 2022 to 30 November 2026 . This is primarily due to the following factors: There were dates presented in the 19/20-Q2 transparency return referring to a project end date of 11 July 2022. The dates presented related to the end of transition from the current contract to new services. The scheduled baseline programme end date remains at 30 November 2026. However, the following are areas of risk for the baseline programme end date: Supplier requests to extend the End User Services procurement window have pushed the dates outside of their current time approval. This was formally accepted since maintaining a viable competition was key to success for End User Services. Similar delays have impacted Records Management and Managed Print procurement, these projects currently remain within their approvals envelope. Changes to the Defence Digital strategy for Performance and Cost is driving a change�to� the commercial approach. This will mean a cheaper outcome and support services transitioning from the current contract.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"","themes":["Commercial & supply chain","Delivery & schedule","Approvals & decisions","Cost & funding"],"evidenceExcerpt":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber/red. This is primarily due to the following factors: The Skills, Capability and complexity of Dependencies across the Programme results in a Delivery Confidence assessment being held at Amber/Red. The resourcing of the Future…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21"},{"id":"MOD_0110_1718-Q1","year":2022,"name":"MODnet Evolve","department":"MOD","category":"ICT","description":"MODNET Evolve will sustain the essential base Information and Communications Technology infrastructure needed by the Ministry of Defence on exit from the current contracted service.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating decreased from Amber/Red to Red. This is primarily due to the following factors: The main reason for Red is because of necessary need to pause and replan End User Services. In turn this contributed towards an unsuccessful procurement of Electronic Records Management. It has also been necessary to review the delivery strategy of Classified MODNet as recommended by the Infrastructure and Projects Authority.","startDate":"2016-02-29","endDate":"2026-11-30","scheduleNarrative":"Compared to 2021-Q4, the project end-date remained scheduled to finish on 30 November 2026.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests)","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests)","benefits":null,"benefitsNarrative":"","themes":["Commercial & supply chain","Delivery & schedule","Cost & funding","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating decreased from Amber/Red to Red. This is primarily due to the following factors: The main reason for Red is because of necessary need to pause and replan End User Services. In turn this contributed towards an unsuccessful procurement of…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"MOD_0110_1718-Q1","year":2023,"name":"MODnet Evolve","department":"MOD","category":"ICT","description":"MODNet Evolve will sustain the essential base Information and Communications Technology infrastructure needed by the Ministry of Defence on exit from the current contracted service.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Red. This is primarily due to the following factors. The assessment of the deliverability of the MOD Official, End User Services and Future Secret Projects. However the recovery plan is in place and the programme is making positive progress and the Future Secret project is now being reset. Also linkages are being strengthened between the current MODnet Official network and its replacement End User Services project.","startDate":"2016-02-29","endDate":null,"scheduleNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This programme does not report cashable benefits. Its aim is to provision the armed forces with the equipment and / or infrastructure required.","themes":["Commercial & supply chain","Delivery & schedule","Cost & funding","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Red. This is primarily due to the following factors. The assessment of the deliverability of the MOD Official, End User Services and Future Secret Projects. However the recovery plan is in place and the programme is…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"MOD_0110_1718-Q1","year":2024,"name":"MODnet Evolve","department":"MOD","category":"ICT","description":"MODNET Evolve provides the essential base IT infrastructure needed by the MOD at OFFICIAL and SECRET on exit from the current contract with the ATLAS consortium. It achieves independence from major monolithic IT contracts by disaggregating them into components; and driving better value for money by exploiting the increasing commoditisation of modern IT services. Additionally; the associated ‘in-housing’ of key IT management capabilities enables MOD to regain control of its IT design; providing the basis for a single enterprise architecture that will meet the MOD's evolving business needs.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Red. This is primarily due to the following factors. The IPA’s review, conducted ten months previously in May 23, assessed that while there is greater delivery confidence with the MODNet Official project there remains uncertainty with the strategic alignment of the Future SECRET project which may, as a result, encounter delays with the Outline Business Case submission. The SROs 23/24-Q4 Delivery Confidence Assessment of Amber was confirmed by the IPA the following month, in April 2024 when an Assurance Review recognised the significant progress made against the Action Plan.","startDate":"2016-02-29","endDate":null,"scheduleNarrative":"Exempt under Section 26 of the Freedom of Information Act 2000 (Defence)","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":0.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 0m.","themes":["Commercial & supply chain","Delivery & schedule","Governance & assurance","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Red. This is primarily due to the following factors. The IPA’s review, conducted ten months previously in May 23, assessed that while there is greater delivery confidence with the MODNet Official project there remains uncertainty…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"MOD_0110_1718-Q1","year":2025,"name":"MODNET EVOLVE","department":"MoD","category":"Military Capability","description":"MODNET Evolve provides the essential base IT infrastructure needed by the MOD at OFFICIAL and SECRET on exit from the 20 year legacy contract with the ATLAS consortium. It achieves independence from major monolithic IT contracts by disaggregating them into components; and driving better value for money by exploiting the increasing commodification of modern IT services. Additionally, the associated ‘in-housing’ of key IT management capabilities enables MOD to control its IT design, providing the basis for a single enterprise architecture that will meet the MOD's evolving business needs.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 increased from RED to AMBER. This is primarily due to the following factors. The migration of all 200,000 Official Tier users worldwide to the new service is underway and will complete in the next financial year. The End User Services (SECRET) contract has been placed and all SECRET Tier users will be migrated to the new service by June 2025, and over 95% of users have moved to the new Managed Print Service which will be completed by July 2025.","startDate":"2016-02-29","endDate":null,"scheduleNarrative":"Section 26 - Defence","fyBaseline":60.93,"fyForecast":43.99,"fyVariance":27.8,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. This reflects a forecast under-spend against budget of £16.957M and is due to the revised delivery schedule for the OFFICIAL Tier.","wholeLifeCost":370.68,"costNarrative":"The project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) is 370.681 This is primarily due to the following factors. Departmental financial pressures have reduced the programme’s budget in FY 24/25 and FY 25/26.","benefits":431.99,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmental-agree monetised benefits at 24/25-Q4 remained at 0m","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Technical & integration"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 increased from RED to AMBER. This is primarily due to the following factors. The migration of all 200,000 Official Tier users worldwide to the new service is underway and will complete in the next financial year. The End User Services (SECRET) contract has been placed…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"MOD_0110_1718-Q1","year":2026,"name":"MODNET EVOLVE","department":"MOD","category":"Information and Communications Technology (ICT)","description":"MODNET Evolve provides the essential base IT infrastructure needed by the MOD at OFFICIAL and SECRET on exit from the 20 year legacy contract with the ATLAS consortium. It achieves independence from major monolithic IT contracts by disaggregating them into components, and driving better value for money by exploiting the increasing commoditisation of modern IT services. Additionally, the associated ‘in-housing’ of key IT management capabilities enables MOD to control its IT design, providing the basis for a single enterprise architecture that will meet the MOD's evolving business needs.","ipaDca":"Green","sroDca":null,"deliveryConfidence":"Green","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 increased to Green. This is primarily due to the following factors. 1. The completion of the migration of all 180,000 OFFICIAL Tier users worldwide to the new MODNET OFFICIAL service, the completion of the migration of the 20,000 SECRET Tier users worldwide to the new MODNET SECRET service, and the planned closure of the programme by July 2026.","startDate":"2016-02-29","endDate":"2026-07-31","scheduleNarrative":"Compared to financial year 24/25-Q4 the programme's end date at 25/26-Q4 remained the same at 31/07/2026.","fyBaseline":30.39,"fyForecast":42.05,"fyVariance":38.37,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. 1. Reflects a forecast over-spend against budget of £12.037M and is primarily due to the revised delivery schedule for the OFFICIAL Tier, which resulted in legacy services continuing for a further 2 months.","wholeLifeCost":309.19,"costNarrative":"Compared to financial year 24/25-Q4, the projects departmental-agreed forecast Whole Life Cost at 25/26-Q4 (measured in £m) decreased from £370.68M to £262.10M. This is primarily due to the following factors. 1. Three projects have been transferred from the core MODNET Evolve change programme to the respective System Owners who are responsible for runing and introducng routine updates to the platforms.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmental-agree monetised benefits at 25/26-Q4 remained at 0m","themes":["Cost & funding","Delivery & schedule","Technical & integration","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 increased to Green. This is primarily due to the following factors. 1. The completion of the migration of all 180,000 OFFICIAL Tier users worldwide to the new MODNET OFFICIAL service, the completion of the migration of the 20,000 SECRET Tier users…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"MOD_0110_1718-Q1","year":2025,"name":"MODNET EVOLVE","department":"MoD","category":"Military Capability","description":"MODNET Evolve provides the essential base IT infrastructure needed by the MOD at OFFICIAL and SECRET on exit from the 20 year legacy contract with the ATLAS consortium. It achieves independence from major monolithic IT contracts by disaggregating them into components; and driving better value for money by exploiting the increasing commodification of modern IT services. Additionally, the associated ‘in-housing’ of key IT management capabilities enables MOD to control its IT design, providing the basis for a single enterprise architecture that will meet the MOD's evolving business needs.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 increased from RED to AMBER. This is primarily due to the following factors. The migration of all 200,000 Official Tier users worldwide to the new service is underway and will complete in the next financial year. The End User Services (SECRET) contract has been placed and all SECRET Tier users will be migrated to the new service by June 2025, and over 95% of users have moved to the new Managed Print Service which will be completed by July 2025.","startDate":"2016-02-29","endDate":null,"scheduleNarrative":"Section 26 - Defence","fyBaseline":60.93,"fyForecast":43.99,"fyVariance":27.8,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. This reflects a forecast under-spend against budget of £16.957M and is due to the revised delivery schedule for the OFFICIAL Tier.","wholeLifeCost":370.68,"costNarrative":"The project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) is 370.681 This is primarily due to the following factors. Departmental financial pressures have reduced the programme’s budget in FY 24/25 and FY 25/26.","benefits":431.99,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmental-agree monetised benefits at 24/25-Q4 remained at 0m","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Technical & integration"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 increased from RED to AMBER. This is primarily due to the following factors. The migration of all 200,000 Official Tier users worldwide to the new service is underway and will complete in the next financial year. The End User Services (SECRET) contract has been placed…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":-1,"transition":"Improved","endDateDeltaDays":null,"attentionScore":13,"attentionReasons":["In-year forecast variance is +38.4%"]},{"id":"DFE_0495_2526-Q1","year":2026,"name":"Free Breakfast Clubs","department":"DFE","category":"Government Transformation and Service Delivery","description":"The government has committed to create a new mandatory free breakfast club duty for all state-funded schools with primary aged pupils on roll. Starting in April 2025, the Department for Education launched the first 750 free breakfast clubs in our early adopter schools. Offering places to nearly 180,000 children. Over the first year of delivery more than 8 million meals were served at the free breakfast clubs to pupils across the country, ensuring that they were fed and ready to start the day. In April 2026 the programme started it's national rollout with an additional 2,000 schools expected to begin delivering free breakfast clubs in the 2026/2027 financial year. Through funding schools to deliver free breakfast clubs, in line with future legislation, the objectives of the policy are to: ensure children are ready to learn at the start of the school day, improving their ability to achieve by giving children a soft start to the school day through a club and breakfast increase household incomes by reducing the amount families spend on groceries and before-school childcare and contributing to an increase in parents’ and carers’ ability to work more hours Establishing a free breakfast club in every primary school was a manifesto commitment. It supports the government’s opportunity and growth missions, specifically the every child achieving and thriving pillar.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 35 - Formulation of government policy","startDate":null,"endDate":null,"scheduleNarrative":"There have been no changes to the projects schedule.","fyBaseline":35.0,"fyForecast":35.0,"fyVariance":35.0,"varianceNarrative":"Exempt under Section 35 – Formulation of government policy","wholeLifeCost":null,"costNarrative":"Exempt under Section 35 - Formulation of government policy","benefits":null,"benefitsNarrative":"Exempt under Section 35 - Formulation of government policy","themes":["Delivery & schedule"],"evidenceExcerpt":"Exempt under Section 35 - Formulation of government policy There have been no changes to the projects schedule.","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"DFE_0495_2526-Q1","year":2026,"name":"Free Breakfast Clubs","department":"DFE","category":"Government Transformation and Service Delivery","description":"The government has committed to create a new mandatory free breakfast club duty for all state-funded schools with primary aged pupils on roll. Starting in April 2025, the Department for Education launched the first 750 free breakfast clubs in our early adopter schools. Offering places to nearly 180,000 children. Over the first year of delivery more than 8 million meals were served at the free breakfast clubs to pupils across the country, ensuring that they were fed and ready to start the day. In April 2026 the programme started it's national rollout with an additional 2,000 schools expected to begin delivering free breakfast clubs in the 2026/2027 financial year. Through funding schools to deliver free breakfast clubs, in line with future legislation, the objectives of the policy are to: ensure children are ready to learn at the start of the school day, improving their ability to achieve by giving children a soft start to the school day through a club and breakfast increase household incomes by reducing the amount families spend on groceries and before-school childcare and contributing to an increase in parents’ and carers’ ability to work more hours Establishing a free breakfast club in every primary school was a manifesto commitment. It supports the government’s opportunity and growth missions, specifically the every child achieving and thriving pillar.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 35 - Formulation of government policy","startDate":null,"endDate":null,"scheduleNarrative":"There have been no changes to the projects schedule.","fyBaseline":35.0,"fyForecast":35.0,"fyVariance":35.0,"varianceNarrative":"Exempt under Section 35 – Formulation of government policy","wholeLifeCost":null,"costNarrative":"Exempt under Section 35 - Formulation of government policy","benefits":null,"benefitsNarrative":"Exempt under Section 35 - Formulation of government policy","themes":["Delivery & schedule"],"evidenceExcerpt":"Exempt under Section 35 - Formulation of government policy There have been no changes to the projects schedule.","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":null,"ratingDelta":null,"transition":"Not comparable","endDateDeltaDays":null,"attentionScore":12,"attentionReasons":["In-year forecast variance is +35.0%"]},{"id":"DOH_0017_1112-Q1","year":2026,"name":"UK Health Security Campus","department":"DHSC","category":"Infrastructure and Construction","description":"Exempt under Section 35 - Formulation of government policy","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 35 - Formulation of government policy","startDate":null,"endDate":null,"scheduleNarrative":"Exempt under Section 35 - Formulation of government policy","fyBaseline":35.0,"fyForecast":35.0,"fyVariance":35.0,"varianceNarrative":"Exempt under Section 35 – Formulation of government policy","wholeLifeCost":null,"costNarrative":"Exempt under Section 35 - Formulation of government policy","benefits":null,"benefitsNarrative":"Exempt under Section 35 - Formulation of government policy","themes":[],"evidenceExcerpt":"Exempt under Section 35 - Formulation of government policy Exempt under Section 35 - Formulation of government policy","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"DOH_0017_1112-Q1","year":2021,"name":"PHE Science Hub","department":"DHSC","category":"Infrastructure and Construction","description":"To create a state-of-the-art campus for applied public health science, as a platform for future generations of national and international scientific expertise, and help enable the transformation UK health protection and security.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber/red. This is primarily due to the following factors: Following Spending Review 2020, a review of the Programme Business Case (PBC) has been initiated with HMT and DHSC. This will take into account factors arising since the PBC was submitted - the creation of UK Health Security Agency and lessons identified from the COVID-19 response. The programme team is working closely with the UKHSA operating model design team to ensure alignment. Site works continue with funding for 2020-21.","startDate":"2013-06-28","endDate":"2025-06-30","scheduleNarrative":"Compared to financial year 19/20-Q2, the project's end-date remained scheduled to finish on 30 June 2025 . This is primarily due to the following factors: The PBC was submitted in December 2019 and was approved in principle at the Major Project Review Group in July 2020 subject to Spending Review conditions. The SR condition specified a review of the OBC options to ensure the robustness of the options appraisal.","fyBaseline":464.03,"fyForecast":262.92,"fyVariance":-43.0,"varianceNarrative":"The budget variance exceeds 5%. New Capital DEL expenditure reflects delays in letting main works contracts originally planned for 20/21.","wholeLifeCost":2656.34,"costNarrative":"Compared to financial year 19/20-Q2, the projects Baseline Whole Life Cost increased from �2656.32m to �2656.34m. This is primarily due to the following factors: Outturn cost projections remain consistent across both years with a only a minor change in WLC values","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Governance & assurance","Approvals & decisions","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber/red. This is primarily due to the following factors: Following Spending Review 2020, a review of the Programme Business Case (PBC) has been initiated with HMT and DHSC. This will take into account factors arising since the PBC…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21"},{"id":"DOH_0017_1112-Q1","year":2022,"name":"PHE Science Hub","department":"DHSC","category":"Infrastructure and Construction","description":"The Science Hub programme aims to create a state-of-the-art, integrated public health campus which will bring together scientific expertise to reduce health inequalities and strengthen public health security through co-location of ageing facilities at Porton and Colindale and some London functions at a new Science Campus in Harlow, Essex. On 1st October 2021, this programme transitioned from PHE to the new UK Health Security Agency.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 decreased from Amber/red to Amber. Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 decreased from Red to Amber The Programme's Capital provision for 2022/23 has been reduced significantly in the light of Departmental funding prioritisation. This has required the Programme to slow activity and stand down the majority of suppliers. This will further delay the programme schedule and change the cost and risk profiles. Work has progressed with suppliers to agree demobilisations, close-out contracts and assure and agree commercial positions. In parallel, work has developed to agree and prioritise 2022/23 activities to complete elements of construction works, protect design integrity and ensure site safety and security. These activities, combined with Programme Business Case development, requirements definition & refinement, and programme re-configuration will position the programme for the best possible ramp-up in 2023/24.","startDate":"2013-06-28","endDate":"2025-06-30","scheduleNarrative":"Compared to 2021-Q4, your project end-date remained scheduled to finish on 30 JUN 2025 . This is primarily due to the following factors: The programme end date will move to beyond 2031/2032. The actual forecast end-date will be clearer with programme business case approval for funding for future years. A variety of factors have caused the schedule to extend including: delay in programme funding approvals; COVID and the transition to UKHSA; significant changes to capital profile post SR21.","fyBaseline":309.02,"fyForecast":284.39,"fyVariance":-8.0,"varianceNarrative":"The budget variance exceeds 5%. Construction contracts could not be awarded given delays to business case approval and extension of the pre-construction period. The Programme has moved substantially beyond the baseline budget and schedule and the cost variance reflects this.","wholeLifeCost":2656.0,"costNarrative":"Compared to 2021-Q4,the projects Baseline Whole Life Cost remained at 2656.34 (£m). This is primarily due to the following factors: Rebaselining will occur following approval of the Programme Business case by the end of FY 22/23","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 decreased from Amber/red to Amber. Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 decreased from Red to Amber The Programme's Capital provision for…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"DOH_0017_1112-Q1","year":2023,"name":"PHE Science Hub","department":"DHSC","category":"Infrastructure and Construction","description":"The UK Health Security Agency Science Hub Programme aims to create a health security campus to provide the UK's leading science centre of excellence. Re-providing and enhancing ageing facilities at Porton and Colindale to bring together expertise from world-leading academic and commercial institutions to protect the public's health security and reduce health inequalities.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Red. This is primarily due to the following factors. Ministers recognise the need for UKHSA to replace its ageing infrastructure to support the continued delivery of it's core mission to protect public health security. Given the scale of investment required, UKHSA is considering further alternative options that may be available, including investing in existing sites, in addition to the current Harlow plan. In the meantime the programme remains focused on validating designs and requirements; and re-framing delivery options, plans and spending approvals in line with further work needed ahead of the Programme Business Case (PBC) submission and approval.","startDate":"2013-06-28","endDate":"2034-10-20","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 increased from 2025-06-30 to 2034-10-20. This is primarily due to the following factors. The programme schedule has been extended in line with successive funding changes requiring activity to be prioritised and the majority of suppliers demobilised. Following steers from Ministers, the Programme Business Case will be developed further and the programme will be re-baselined. If PBC approval is gained in 2023/24 the completion date for the programme would likely now move out to beyond 2035.","fyBaseline":205.33,"fyForecast":300.51,"fyVariance":46.0,"varianceNarrative":"The budget variance exceeds 5%. The data for the budget and forecast shown are based on figures provided in the June 2020 PBC which will be superseded. Successive changes to budgets have amended the schedule with consequential impact on forecasts.","wholeLifeCost":2656.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 remained at 2656m. This is primarily due to the following factors. Programme business case development, assurance and approvals planning will be re-set in line with the updated programme schedule and budget. The expected whole life cost will be re-baselined following approval of the Programme Business Case.","benefits":8250.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 8250m. The project's departmental-agree monetised benefits at 22/23-Q4 is 8250m.The project's departmental-agree monetised benefits at 22/23-Q4 is 8250m.The project's departmental-agree monetised benefits at 22/23-Q4 is 8250m. Benefits included in the current case relate to Health Economic QALYs driven by the collaboration and consolidated science and health security capabilities on a single site. Cost savings generated from the programme are netted against operating costs in the case.Following further work on options, any changes to the programmes planned scope will require a refresh of the Benefits Narrative and review of the benefits being delivered.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Red. This is primarily due to the following factors. Ministers recognise the need for UKHSA to replace its ageing infrastructure to support the continued delivery of it's core mission to protect public health security.…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"DOH_0017_1112-Q1","year":2024,"name":"PHE Science Hub","department":"DHSC","category":"Infrastructure and Construction","description":"The UKHSA Health Security Campus Programme aims to create the UKs leading science centre of excellence. It will replace the ageing facilities at Porton and Colindale and bring together expertise from world-leading academic and commercial institutions to protect the public's health security and reduce health inequalities.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Red. This is primarily due to the following factors. The future plans for the Science Hub will be confirmed by Ministers after the election, and funding confirmed in the subsequent Spending Review","startDate":"2013-06-28","endDate":null,"scheduleNarrative":"ARMP adjustments - Project not yet in a position to give cost/schedule","fyBaseline":0.0,"fyForecast":0.0,"fyVariance":null,"varianceNarrative":"ARMP adjustments - Project not yet in a position to give cost/schedule","wholeLifeCost":null,"costNarrative":"ARMP adjustments - Project not yet in a position to give cost/schedule","benefits":null,"benefitsNarrative":"ARMP adjustments - Project not yet in a position to give cost/schedule","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Red. This is primarily due to the following factors. The future plans for the Science Hub will be confirmed by Ministers after the election, and funding confirmed in the subsequent Spending Review ARMP adjustments -…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"DOH_0017_1112-Q1","year":2025,"name":"PHE SCIENCE HUB","department":"DHSC","category":"Infrastructure and Construction","description":"Section 35 - Formulation of government policy","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Section 35 - Formulation of government policy","startDate":null,"endDate":null,"scheduleNarrative":"Section 35 - Formulation of government policy","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 35 - Formulation of government policy","wholeLifeCost":null,"costNarrative":"Section 35 - Formulation of government policy","benefits":null,"benefitsNarrative":"Section 35 - Formulation of government policy","themes":[],"evidenceExcerpt":"Section 35 - Formulation of government policy Section 35 - Formulation of government policy","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"DOH_0017_1112-Q1","year":2026,"name":"UK Health Security Campus","department":"DHSC","category":"Infrastructure and Construction","description":"Exempt under Section 35 - Formulation of government policy","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 35 - Formulation of government policy","startDate":null,"endDate":null,"scheduleNarrative":"Exempt under Section 35 - Formulation of government policy","fyBaseline":35.0,"fyForecast":35.0,"fyVariance":35.0,"varianceNarrative":"Exempt under Section 35 – Formulation of government policy","wholeLifeCost":null,"costNarrative":"Exempt under Section 35 - Formulation of government policy","benefits":null,"benefitsNarrative":"Exempt under Section 35 - Formulation of government policy","themes":[],"evidenceExcerpt":"Exempt under Section 35 - Formulation of government policy Exempt under Section 35 - Formulation of government policy","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"DOH_0017_1112-Q1","year":2025,"name":"PHE SCIENCE HUB","department":"DHSC","category":"Infrastructure and Construction","description":"Section 35 - Formulation of government policy","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Section 35 - Formulation of government policy","startDate":null,"endDate":null,"scheduleNarrative":"Section 35 - Formulation of government policy","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 35 - Formulation of government policy","wholeLifeCost":null,"costNarrative":"Section 35 - Formulation of government policy","benefits":null,"benefitsNarrative":"Section 35 - Formulation of government policy","themes":[],"evidenceExcerpt":"Section 35 - Formulation of government policy Section 35 - Formulation of government policy","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":null,"transition":"Not comparable","endDateDeltaDays":null,"attentionScore":12,"attentionReasons":["In-year forecast variance is +35.0%"]},{"id":"DEFRA_0007_2021-Q1","year":2026,"name":"National Biosecurity Centre (Weybridge)","department":"DEFRA","category":"Infrastructure and Construction","description":"The National Biosecurity Centre Programme is transforming the Animal & Plant Health Agency (APHA) Weybridge site, delivering a state-of-the-art National Biosecurity Centre facility to future proof the UK’s ability to provide essential research, surveillance and outbreak response for a range of animal pathogens, some of which are a threat to humans. It will support UK trade, our food and farming sectors, protect economic growth and the prosperity of the nation.","ipaDca":"Green","sroDca":null,"deliveryConfidence":"Green","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 increased to GREEN. This reflects the positive progress made over the past 12 months and robustness of arrangements in place which give confidence in the deliverability of the Programme, as evidenced by the GREEN rating achieved through the NISTA Gate 0 Review in March.","startDate":"2021-04-01","endDate":"2036-09-30","scheduleNarrative":"Compared to financial year 24/25-Q4, the Programme's end-date at 25/26-Q4 remained the same at 30 Sep 2036. This is primarily due to the continued progress made towards developing designs for the future science buildings and preparing the site for the start of their construction in 2027. All critical enabling works are now in contract and works on site are ramping up. A Main Works Contractor for the new science buildings has been appointed, and RIBA 3 designs have been approved. The Programme remains a priority for Defra.","fyBaseline":128.73,"fyForecast":85.42,"fyVariance":33.64,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the timing of some enabling and infrastructure works moving to the right to prioritise critical activities, and an extension of science hub design development timescales to ensure appropriate quality prior to transferring design responsibility to the Main Works contractor. Deferred spend has been re-forecast within future FYs.","wholeLifeCost":2485.6,"costNarrative":"Compared to financial year 24/25-Q4, the Programme’s departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) remained at £2,820M. This is primarily due to continued progress in line with the scope and assumptions that underpin the Programme Business Case approved in December 2024.","benefits":10131.06,"benefitsNarrative":"Compared to financial year 24/25-Q4, the Programme’s departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at £16,216M. This is primarily due to the benefits identified within the approved Programme Business Case remaining unchanged.","themes":["Cost & funding","Delivery & schedule","Scope & requirements","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 increased to GREEN. This reflects the positive progress made over the past 12 months and robustness of arrangements in place which give confidence in the deliverability of the Programme, as evidenced by the GREEN rating achieved through the NISTA Gate…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"DEFRA_0007_2021-Q1","year":2021,"name":"Science Capability in Animal Health Programme","department":"DEFRA","category":"Infrastructure and Construction","description":"The SCAH Programme sets out the Department for Environment, Food and Rural Affairs' (Defra's) plans for long-term investment in the Government's main animal health science facility. The re-development of the site infrastructure and associated transformation programme will secure and safeguard the critical animal health science capability, protecting the nation from the impacts of animal diseases in a cost effective way.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber/red.This is primarily due to the following factors: Delivery Confidence is Amber-Red due to the likelihood of Programme cost exceeding its March 2020 budget allocation following development of more detailed plans for the new Science Hub. A new Programme Business Case, informed by a more comprehensive view of the change requirement, will form the basis for a re-baseline of cost, benefits and schedule. IPA validated this as a credible pathway to Green in December 2020.","startDate":"2018-02-05","endDate":"2029-06-30","scheduleNarrative":"The project end-date is 30 June 2029. This is primarily due to the following factors: A new schedule for the Programme Business Case will be informed by a more detailed understanding of the scheme requirements.","fyBaseline":38.0,"fyForecast":15.7,"fyVariance":-59.0,"varianceNarrative":"The budget variance exceeds 5%. The programme budget is expected to be in variance to the Outline Business Case baseline over its lifetime, which formed the basis of the Budget 2020 allocation.","wholeLifeCost":1509.0,"costNarrative":"The projects Baseline Whole Life Cost is �1508.99m. This is primarily due to the following factors: The Project Whole Life costs is being updated and re-baselined as part of the Programme Business Case.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Scope & requirements"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber/red.This is primarily due to the following factors: Delivery Confidence is Amber-Red due to the likelihood of Programme cost exceeding its March 2020 budget allocation following development of more detailed plans for the new Science Hub. A new Programme Business Case,…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21"},{"id":"DEFRA_0007_2021-Q1","year":2022,"name":"Science Capability in Animal Health Programme","department":"DEFRA","category":"Infrastructure and Construction","description":"The SCAH Programme sets out the Department for Environment, Food and Rural Affairs' (Defra) plans for long-term investment in the Government's main animal health science facility. The re-development of the site infrastructure and associated transformation programme will secure and safeguard the critical animal health science capability, protecting the nation from the impacts of animal diseases in a cost effective way.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 decreased from Amber/red to Amber The programme is in the process of defining key deliverables and the approach to their delivery. As such no overarching programme-level Internal Quality Assurance has been undertaken. Realtime assurance is provided by the GIAA at the programme's Integration Board, which oversees and manages the integration and phasing of capital, transformation and science capability activities on a fortnightly basis. The GIAA provided a Moderate assurance opinion for 2021/22. Delivery confidence is AMBER due to the acceptance of a revised Business Case in late 2021, which enables the programme to make progress with delivery. HMT confirmed the allocation of the £200m investment in the SR21, and work has now started on site. During the first phase of delivery, core assumptions will be tested to optimise the delivery plan, professional services procurements will progress and the design for the main science facilities will be matured: these will inform a further business case in Spring 2024.","startDate":"2021-04-01","endDate":"2036-09-30","scheduleNarrative":"Compared to 2021-Q4, your project end-date increased from 30 JUN 2029 to 30 SEP 2036 . This is primarily due to the following factors: The revised schedule reflects the more mature scheme design underpinning the 2021 business case.","fyBaseline":19.81,"fyForecast":19.1,"fyVariance":-4.0,"varianceNarrative":"The SCAH spend for 21/22 reflects the revised profile of spend now included in the Programme Business Case and aligned to the SR settlement, rather than the higher spend in the earlier SR20.","wholeLifeCost":2820.0,"costNarrative":"Compared to2021-Q4, the projects Baseline Whole Life Cost increased from 1508.99 (£m) to 2820.20 (£m). This is primarily due to the following factors: Compared to 2021-Q4, the project estimated Whole Life Cost changed to 2820.20 (£m). This reflects increased design maturity, more in-depth benchmarking against equivalent scheme, more cautious risk and Optimism Bias, increased programme length due to more detailed scheduling of the transition steps required, and the addition of elements not previously included, in particular science and digital transformation as well as new requirements around sustainability.","benefits":null,"benefitsNarrative":"","themes":["Delivery & schedule","Cost & funding","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 decreased from Amber/red to Amber The programme is in the process of defining key deliverables and the approach to their delivery. As such no overarching programme-level Internal Quality Assurance has been undertaken. Realtime…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"DEFRA_0007_2021-Q1","year":2023,"name":"Science Capability in Animal Health Programme","department":"DEFRA","category":"Infrastructure and Construction","description":"The SCAH Programme sets out the Department for Environment, Food and Rural Affairs' (Defra) plans for long-term investment in the Government's main animal health science facility. The re-development of the site infrastructure and associated transformation programme will secure and safeguard the critical animal health science capability, protecting the nation from the impacts of animal diseases in a cost effective way.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. Good progress is being made towards clearing the site for construction and to inform the main investment decision point in Q3 2024 which will settle scope. This includes work on requirements and specialist technical services to support maturing the design for the scheme, which will underpin the business case. The programme remains amber due to current uncertainty of scope and funding, which will be addressed at the next Business case in 2024.","startDate":"2021-04-01","endDate":"2036-09-30","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2036-09-30. This is primarily due to the following factors. The forecast completion date for the Programme remains September '36 pending further development of the Programme Master Schedule to reflect the changes approved following the first Tranche of activity (T1a).","fyBaseline":29.72,"fyForecast":27.54,"fyVariance":-7.0,"varianceNarrative":"Forecast spend for 22/23 is c. 2.2M (7%) below the budget allocated primarily as a result of the Programme not spending c.1.5M of optimism bias that was built into the allocated budget as SRO-owned contingency for the Programme.","wholeLifeCost":2820.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 remained at 2820m. This is primarily due to the following factors. The Whole Life Cost estimate has reduced as a result of a reforecast of costs following an assessment of the changes identified through Tranche 1a of the Programme. These revised costs also reflect the updated Master Schedule.","benefits":208.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 208m. The project's departmental-agree monetised benefits at 22/23-Q4 is 208m.The project's departmental-agree monetised benefits at 22/23-Q4 is 208m.The project's departmental-agree monetised benefits at 22/23-Q4 is 208m. Work continues to identify and refine benefits for inclusion within Programme Business Case V2.0.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. Good progress is being made towards clearing the site for construction and to inform the main investment decision point in Q3 2024 which will settle scope. This…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"DEFRA_0007_2021-Q1","year":2024,"name":"Science Capability in Animal Health Programme","department":"DEFRA","category":"Infrastructure and Construction","description":"The SCAH Programme sets out the Department for Environment, Food and Rural Affairs' (Defra) plans for long-term investment in the Government's main animal health science facility. The re-development of the site infrastructure and associated transformation programme will secure and safeguard the critical animal health science capability, protecting the nation from the impacts of animal diseases in a cost effective way.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The Programme has continued to make good progress through 23/24 to settle it's scope and progress works to clear the site in readiness for construction of new science buildings. The Programme has updated it's operating model to reflect the onboarding of Technical and Delivery Partners, and subsequent restructuring of the Intelligent Client Function. Designs have been developed in line with refined requirements, and a preferred scheme has been selected. Work is on track to submit the next Programme Business Case in 2024 to secure the scope and funding for the Programme. Delivery Confidence remains Amber pending approval.","startDate":"2021-04-01","endDate":"2036-09-30","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2036-09-30. This is primarily due to the following factors. The forecast completion date for the Programme remains September 2036. The Programme schedule will be re-validated through Programme Business Case V2.0 for which approval will be sought in FY24/25.","fyBaseline":79.62,"fyForecast":38.6,"fyVariance":-52.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. FY23/24 spend has been lower than budgeted as a result of changes to the Programme operating model and delivery plans which has resulted in some activities being deferred to future years. Delays to enabling works and not spending SRO-owned contingency has also contributed to the underspend.","wholeLifeCost":2820.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 remained at 2820m. This is primarily due to the following factors. The Whole Life Costs for the Programme remain unchanged as the Programme continues to refine its delivery strategy. The WLC will be re-validated through Programme Business Case V2.0 for which approval will be sought in FY24/25.","benefits":208.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 208m. Work continues to identify and refine benefits for inclusion within Programme Business Case V2.0.","themes":["Delivery & schedule","Cost & funding","Approvals & decisions","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The Programme has continued to make good progress through 23/24 to settle it's scope and progress works to clear the site in readiness for construction of new science…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"DEFRA_0007_2021-Q1","year":2025,"name":"National Biosecurity Centre (Weybridge)","department":"DEFRA","category":"Infrastructure and Construction","description":"The National Biosecurity Centre Programme is transforming the Animal & Plant Health Agency (APHA) Weybridge site, delivering a state-of-the-art National Biosecurity Centre facility to future proof the UK’s ability to provide essential research, surveillance and outbreak response for a range of animal pathogens, some of which are a threat to humans. It will support UK trade, our food and farming sectors, protect economic growth and the prosperity of the nation.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ With successful delivery of the Programme still feasible in light of the considerable progress made over the past 12 months. Whilst the Aug 2024 Project Assessment Review rated the programme GREEN for proceeding through Programme Business Case approval, the Delivery Confidence Assessment remains AMBER given the need for the Programme to secure funding through the second stage of the Spending Review.","startDate":"2021-04-01","endDate":"2036-09-30","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 30/09/2036. This is primarily due to the following factors‚ The Programme has continued to make good progress in relation to enabling works and preparations for construction of the new science buildings, with RIBA 3 design activities progressing to plan and procurement of a Main Works contractor on track to conclude in May 2025. The Programme’s Master Outline Planning Application has been granted consent by the Local Planning Authority and the Programme has secured approval of an updated Programme Business Case from Treasury. The Programme remains a priority for Defra.","fyBaseline":74.9,"fyForecast":50.1,"fyVariance":33.11,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The Programme continues to deliver enabling works and infrastructure projects to prepare the site for main construction, with a number of key projects underway, including site power and water infrastructure. The spend profile which was estimated in the 2021 reflects actual starts on site; some activity has moved to the right, but the Programme remains on schedule.","wholeLifeCost":null,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 2820. This is primarily due to the following factors‚ The Programme’s estimated costs have been reviewed and confirmed as part of the development of the updated Programme Business Case approved by Treasury in December 2024. Whilst unchanged, the Programme cost forecast reflects greater maturity, and less uncertainty in costs, as a result of a more mature design, operating model, delivery plan and commercial strategy.","benefits":16216.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 208 to 16216. This is primarily due to the following factors‚ Programme benefits were re-assessed as part of the development of the updated Programme Business Case, which included the development of a more detailed analytical framework for monetising the economic benefits of the Programme. The updated benefits baseline reflects the monetised benefits identified within the Programme Business Case approved by Treasury in December 2024, for which robust and appropriately validated monetised assessment methods were developed for two benefit categories: (1) reducing disease threats and (2) supporting UK trade.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ With successful delivery of the Programme still feasible in light of the considerable progress made over the past 12 months. Whilst the Aug 2024 Project Assessment…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"DEFRA_0007_2021-Q1","year":2026,"name":"National Biosecurity Centre (Weybridge)","department":"DEFRA","category":"Infrastructure and Construction","description":"The National Biosecurity Centre Programme is transforming the Animal & Plant Health Agency (APHA) Weybridge site, delivering a state-of-the-art National Biosecurity Centre facility to future proof the UK’s ability to provide essential research, surveillance and outbreak response for a range of animal pathogens, some of which are a threat to humans. It will support UK trade, our food and farming sectors, protect economic growth and the prosperity of the nation.","ipaDca":"Green","sroDca":null,"deliveryConfidence":"Green","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 increased to GREEN. This reflects the positive progress made over the past 12 months and robustness of arrangements in place which give confidence in the deliverability of the Programme, as evidenced by the GREEN rating achieved through the NISTA Gate 0 Review in March.","startDate":"2021-04-01","endDate":"2036-09-30","scheduleNarrative":"Compared to financial year 24/25-Q4, the Programme's end-date at 25/26-Q4 remained the same at 30 Sep 2036. This is primarily due to the continued progress made towards developing designs for the future science buildings and preparing the site for the start of their construction in 2027. All critical enabling works are now in contract and works on site are ramping up. A Main Works Contractor for the new science buildings has been appointed, and RIBA 3 designs have been approved. The Programme remains a priority for Defra.","fyBaseline":128.73,"fyForecast":85.42,"fyVariance":33.64,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the timing of some enabling and infrastructure works moving to the right to prioritise critical activities, and an extension of science hub design development timescales to ensure appropriate quality prior to transferring design responsibility to the Main Works contractor. Deferred spend has been re-forecast within future FYs.","wholeLifeCost":2485.6,"costNarrative":"Compared to financial year 24/25-Q4, the Programme’s departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) remained at £2,820M. This is primarily due to continued progress in line with the scope and assumptions that underpin the Programme Business Case approved in December 2024.","benefits":10131.06,"benefitsNarrative":"Compared to financial year 24/25-Q4, the Programme’s departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at £16,216M. This is primarily due to the benefits identified within the approved Programme Business Case remaining unchanged.","themes":["Cost & funding","Delivery & schedule","Scope & requirements","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 increased to GREEN. This reflects the positive progress made over the past 12 months and robustness of arrangements in place which give confidence in the deliverability of the Programme, as evidenced by the GREEN rating achieved through the NISTA Gate…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"DEFRA_0007_2021-Q1","year":2025,"name":"National Biosecurity Centre (Weybridge)","department":"DEFRA","category":"Infrastructure and Construction","description":"The National Biosecurity Centre Programme is transforming the Animal & Plant Health Agency (APHA) Weybridge site, delivering a state-of-the-art National Biosecurity Centre facility to future proof the UK’s ability to provide essential research, surveillance and outbreak response for a range of animal pathogens, some of which are a threat to humans. It will support UK trade, our food and farming sectors, protect economic growth and the prosperity of the nation.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ With successful delivery of the Programme still feasible in light of the considerable progress made over the past 12 months. Whilst the Aug 2024 Project Assessment Review rated the programme GREEN for proceeding through Programme Business Case approval, the Delivery Confidence Assessment remains AMBER given the need for the Programme to secure funding through the second stage of the Spending Review.","startDate":"2021-04-01","endDate":"2036-09-30","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 30/09/2036. This is primarily due to the following factors‚ The Programme has continued to make good progress in relation to enabling works and preparations for construction of the new science buildings, with RIBA 3 design activities progressing to plan and procurement of a Main Works contractor on track to conclude in May 2025. The Programme’s Master Outline Planning Application has been granted consent by the Local Planning Authority and the Programme has secured approval of an updated Programme Business Case from Treasury. The Programme remains a priority for Defra.","fyBaseline":74.9,"fyForecast":50.1,"fyVariance":33.11,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The Programme continues to deliver enabling works and infrastructure projects to prepare the site for main construction, with a number of key projects underway, including site power and water infrastructure. The spend profile which was estimated in the 2021 reflects actual starts on site; some activity has moved to the right, but the Programme remains on schedule.","wholeLifeCost":null,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 2820. This is primarily due to the following factors‚ The Programme’s estimated costs have been reviewed and confirmed as part of the development of the updated Programme Business Case approved by Treasury in December 2024. Whilst unchanged, the Programme cost forecast reflects greater maturity, and less uncertainty in costs, as a result of a more mature design, operating model, delivery plan and commercial strategy.","benefits":16216.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 208 to 16216. This is primarily due to the following factors‚ Programme benefits were re-assessed as part of the development of the updated Programme Business Case, which included the development of a more detailed analytical framework for monetising the economic benefits of the Programme. The updated benefits baseline reflects the monetised benefits identified within the Programme Business Case approved by Treasury in December 2024, for which robust and appropriately validated monetised assessment methods were developed for two benefit categories: (1) reducing disease threats and (2) supporting UK trade.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ With successful delivery of the Programme still feasible in light of the considerable progress made over the past 12 months. Whilst the Aug 2024 Project Assessment…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":-1,"transition":"Improved","endDateDeltaDays":0,"attentionScore":11,"attentionReasons":["In-year forecast variance is +33.6%"]},{"id":"CO_0120_2223-Q1","year":2026,"name":"Transforming Public Procurement","department":"CO","category":"Government Transformation and Service Delivery","description":"The public procurement spend has a significant role to play in stimulating the economy. The objective of this programme is to implement legislative reforms to the UK’s public procurement regime, making it quicker, simpler and better able to meet the UK’s needs while remaining compliant with our international obligations. The programme includes implementing primary legislation, training 15,000 public sector buyers, and developing a new digital platform for commercial data.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at a RAG rating of Green. This is primarily due to all the major deliverables being achieved and expected programme closure on March 31st 2026. We are now in the final stages of closedown with only minor tasks remaining including a final programme closure report, the final programme board (on the 23rd April 2026), completion of remaining procurement notices on the CDP and handover to BAU. This is all confidently expected to be completed by the end of March.","startDate":"2021-01-01","endDate":"2026-03-31","scheduleNarrative":"Compared to financial year 24/25 Q4, the project's end-date at 25/26 Q4 remained the same. This is primarily due to all the major deliverables being achieved and expected programme closure on March 31st 2026. All tasks are confidently expected to be completed by the end of March.","fyBaseline":6.09,"fyForecast":8.04,"fyVariance":31.96,"varianceNarrative":"The 'real term' figures calculated by NISTA are not representative of the project data held on costs and see the Budget variance exceeds 5%. Following the integration of comprehensive maintenance costs through to Programme closure at the end of FY 25/26, the total Whole Life Cost has slightly decreased. The current forecast spend is £30.26m, representing a net reduction from the original projection of £31.47m.","wholeLifeCost":32.47,"costNarrative":"Following the integration of comprehensive maintenance costs through to Programme closure, the total Whole Life Cost has been slightly decreased.","benefits":271.7,"benefitsNarrative":"Delays to the commencement of the Procurement Act mean that benefits will start accruing later than initially anticipated. While the benefit estimates in the Impact Assessment published in April 2022 remain valid, the net realisation of benefits in the initial 10yr assessment period will be lower, as a result of this delay. https://bills.parliament.uk/publications/46429/documents/1767","themes":["Cost & funding","Technical & integration","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at a RAG rating of Green. This is primarily due to all the major deliverables being achieved and expected programme closure on March 31st 2026. We are now in the final stages of closedown with only minor tasks remaining including a final…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"CO_0120_2223-Q1","year":2023,"name":"Transforming Public Procurement","department":"CO","category":"Government Transformation and Service Delivery","description":"The Cabinet Office has started mobilisation of this programme in 2021/22 which will deliver: Introduction and delivery of a Procurement Reform Bill, delivery of the implementing secondary legislation and a new oversight unit to monitor compliance. A comprehensive training package to embed the new procurement procedures and national priorities for public procurement. New digital systems for commercial data that will bring commercial insight together across the 300bn pa public procurement spend. The Benefits from the programme are: Simpler, faster procurement procedures A more streamline process backed up by relevant training for users Greater transparency surrounding procurement procedures","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 is Amber. This is primarily due to the following factors. As a result of delays, the programme suffered setbacks in the delivery of key components of the programme along the critical path. This has necessitated the need for a programme re-baseline, which as of May 2023, has been approved and will see the new procurement regime go live in October 2024. . We are confident as a programme team that we can deliver to our policy intent, programme vision and programme benefits to a good standard within this newly allocated time frame.","startDate":"2021-01-01","endDate":"2025-03-31","scheduleNarrative":"The project's end-date at 22/23-Q4 is 2025-03-31. This is primarily due to the following factors. Due to programme wide replanning and authorisation on the re-baseline, the programme end date is now Q1 2026 (where previously it was Q4 2025). Significant work has been undertaken to ensure this milestone is achievable. Regular reporting, including directly to the minister via an overarching level 1 schedule, along with automated planning ensures that any delays can be acted upon accordingly to minimise impact/slippage.","fyBaseline":2.14,"fyForecast":1.65,"fyVariance":-23.0,"varianceNarrative":"The project's departmental-agree Whole Life Cost at 22/23-Q4 is 35m. At present the programme's baseline wlc remains the same as when we entered the GMPP in the first quarter of 2022/23. As mentioned previously, due to the re-baseline it is likely this may change our wlc figure. We are currently undertaking a review of the cost impact and will reporton this in the next reporting round.","wholeLifeCost":35.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 22/23-Q4 is 35m. This is primarily due to the following factors. The project's departmental-agree Whole Life Cost at 22/23-Q4 is 35m. At present the programme's baseline wlc remains the same as when we entered the GMPP in the first quarter of 2022/23. As mentioned previously, due to the re-baseline it is likely this may increase wlc. We are currently undertaking a review of the cost impact.","benefits":205.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 205m. Our benefits figure is 205 million over 10 years as drawn from the published Impact Assessment (see summary on page 4) https://bills.parliament.uk/publications/46429/documents/1767","themes":["Cost & funding","Delivery & schedule","Scope & requirements","Governance & assurance"],"evidenceExcerpt":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 is Amber. This is primarily due to the following factors. As a result of delays, the programme suffered setbacks in the delivery of key components of the programme along the critical path. This has necessitated the need for a programme re-baseline, which as of May 2023, has…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"CO_0120_2223-Q1","year":2024,"name":"Transforming Public Procurement","department":"CO","category":"Government Transformation and Service Delivery","description":"The cabinet office started mobilisation of the programme in 2021/22 which will deliver:_x000D_ . Introduction and delivery of a procurement reform bill, delivery of the implementing secondary legislation and a new oversight unit to monitor compliance_x000D_ . Comprehensive training package to embed the new procurement procedures and national priorities for public procurement_x000D_ . New digital systems for commercial data that will bring commercial insight together across the 300bn Public procurement spend_x000D_ With the benefits from the programme being:_x000D_ . Simpler, faster procurement procedure_x000D_ . Streamlined process back up by relevant training for user_x000D_ . Greater transparency surrounding procurement procedures","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. 2023-24 witnessed significant milestones in the programme with the Royal Assent of the Procurement Act, launch of first training and guidance products, releases of digital notices to key stakeholders, and engagement and communications activities to support the launch of the new regime. The programme remains on track to deliver the new regime in October 2024. The laying of the secondary legislation on the 25th March ensured that the six month implementation period has been maintained. The Programme underwent an assurance review in November, resulting in an Amber appraisal and confidence from the reviewers that delivery to the original stated outcomes would be achieved.","startDate":"2021-01-01","endDate":"2025-03-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2025-03-31. This is primarily due to the following factors. Royal Assent of the Procurement Act was later than anticipated, pushing back the launch of the new regime to October 2024 and project end date to 31.03.2026","fyBaseline":7.1,"fyForecast":6.5,"fyVariance":-8.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. Royal Assent of the Procurement Act was later than anticipated, pushing back recruitment to some L&D roles and leading to a reduction to the forecast L&D delivery costs for 23/24 (moving them to 24/25), leading to an underspend in 2023/24. This has not affected the launch of L&D products and the new public procurement regime is on track to launch in October 2024","wholeLifeCost":35.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 remained at 35m. This is primarily due to the following factors. The project's baseline WLC remains at 35m. The project business case is being refreshed as we prepare for entering the next phase of the project lifecycle with go live of the new procurement regime in October 2024 and the subsequent development phases to follow.","benefits":205.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 205m. The project's best estimate net benefits remains at 205m over 10 years. We expect the non-quantifiable benefits to be significantly greater than this. This is as set out in the Impact Assessment published in April 2022 https://bills.parliament.uk/publications/46429/documents/1767","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. 2023-24 witnessed significant milestones in the programme with the Royal Assent of the Procurement Act, launch of first training and guidance products, releases of digital…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"CO_0120_2223-Q1","year":2025,"name":"Transforming Public Procurement","department":"CO","category":"Government Transformation and Service Delivery","description":"The Transforming Public Procurement Programme aims to improve the way public procurement is regulated in order to: • Create a simpler and more flexible, commercial system that better meets our country’s needs while remaining compliant with our international obligations • Open up public procurement to new entrants such as small businesses and social enterprises so that they can compete for and win more public contracts • Embed transparency throughout the commercial lifecycle so that the spending of taxpayers’ money can be properly scrutinised.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors‚ The programme achieved a successful go-live on the 24th February 2025 as planned, with the commencement of the Procurement Act and successful launch of the central digital platform. In the first month of operation, over 2000 procurement notices were published and 13,000 suppliers registered. Overall take up of the learning and development products remains high, with nearly 19,000 learners having completed the e-learning and over 14,500 enrolled on the advanced ‘deep dive’ training. The National Procurement Policy Statement laid in Parliament prior to go-live constituted the final major workstream of the Policy and Legislation project and this has now subsequently entered closedown, along with the Learning and Development project. With the major components now delivered, the programme is focused on further development of the central digital platform. Evaluation planning is underway, with an interim evaluation planned to assess the first year of delivery, ahead of full evaluation after 5 years. We anticipate the programme to enter closure as planned at the end of 2025/26.","startDate":"2021-01-01","endDate":"2026-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2025 to 31/03/2026. This is primarily due to the following factors‚ The project end date was moved to 31/03/2026 in financial year 23/24, as a result of the later than anticipated royal assent of the Procurement Act in October 2023. There has been no further change to project end date during 24/25.","fyBaseline":10.35,"fyForecast":8.98,"fyVariance":13.24,"varianceNarrative":"The budget variance is -13%. This is primarily due to the following factors‚ There has been some underspend on the central digital platform project in 2024/25, largely relating to slight delays and therefore reduced costs relating to hosting, data reporting and analytics development work (moving the development work into 2025/26). This did not affect the successful launch of the platform and wider programme in February 2025.","wholeLifeCost":31.5,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 31.5. This is primarily due to the following factors‚ The project's baseline has stabilised at £31.5m and expected whole life costs are in line with this.","benefits":205.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 205. This is primarily due to the following factors‚ Benefits realisation will start later than previously planned due to delays in the commencement act, causing the figure to remain stable.","themes":["Cost & funding","Commercial & supply chain","Technical & integration","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors‚ The programme achieved a successful go-live on the 24th February 2025 as planned, with the commencement of the Procurement Act and successful launch of…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"CO_0120_2223-Q1","year":2026,"name":"Transforming Public Procurement","department":"CO","category":"Government Transformation and Service Delivery","description":"The public procurement spend has a significant role to play in stimulating the economy. The objective of this programme is to implement legislative reforms to the UK’s public procurement regime, making it quicker, simpler and better able to meet the UK’s needs while remaining compliant with our international obligations. The programme includes implementing primary legislation, training 15,000 public sector buyers, and developing a new digital platform for commercial data.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at a RAG rating of Green. This is primarily due to all the major deliverables being achieved and expected programme closure on March 31st 2026. We are now in the final stages of closedown with only minor tasks remaining including a final programme closure report, the final programme board (on the 23rd April 2026), completion of remaining procurement notices on the CDP and handover to BAU. This is all confidently expected to be completed by the end of March.","startDate":"2021-01-01","endDate":"2026-03-31","scheduleNarrative":"Compared to financial year 24/25 Q4, the project's end-date at 25/26 Q4 remained the same. This is primarily due to all the major deliverables being achieved and expected programme closure on March 31st 2026. All tasks are confidently expected to be completed by the end of March.","fyBaseline":6.09,"fyForecast":8.04,"fyVariance":31.96,"varianceNarrative":"The 'real term' figures calculated by NISTA are not representative of the project data held on costs and see the Budget variance exceeds 5%. Following the integration of comprehensive maintenance costs through to Programme closure at the end of FY 25/26, the total Whole Life Cost has slightly decreased. The current forecast spend is £30.26m, representing a net reduction from the original projection of £31.47m.","wholeLifeCost":32.47,"costNarrative":"Following the integration of comprehensive maintenance costs through to Programme closure, the total Whole Life Cost has been slightly decreased.","benefits":271.7,"benefitsNarrative":"Delays to the commencement of the Procurement Act mean that benefits will start accruing later than initially anticipated. While the benefit estimates in the Impact Assessment published in April 2022 remain valid, the net realisation of benefits in the initial 10yr assessment period will be lower, as a result of this delay. https://bills.parliament.uk/publications/46429/documents/1767","themes":["Cost & funding","Technical & integration","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at a RAG rating of Green. This is primarily due to all the major deliverables being achieved and expected programme closure on March 31st 2026. We are now in the final stages of closedown with only minor tasks remaining including a final…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"CO_0120_2223-Q1","year":2025,"name":"Transforming Public Procurement","department":"CO","category":"Government Transformation and Service Delivery","description":"The Transforming Public Procurement Programme aims to improve the way public procurement is regulated in order to: • Create a simpler and more flexible, commercial system that better meets our country’s needs while remaining compliant with our international obligations • Open up public procurement to new entrants such as small businesses and social enterprises so that they can compete for and win more public contracts • Embed transparency throughout the commercial lifecycle so that the spending of taxpayers’ money can be properly scrutinised.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors‚ The programme achieved a successful go-live on the 24th February 2025 as planned, with the commencement of the Procurement Act and successful launch of the central digital platform. In the first month of operation, over 2000 procurement notices were published and 13,000 suppliers registered. Overall take up of the learning and development products remains high, with nearly 19,000 learners having completed the e-learning and over 14,500 enrolled on the advanced ‘deep dive’ training. The National Procurement Policy Statement laid in Parliament prior to go-live constituted the final major workstream of the Policy and Legislation project and this has now subsequently entered closedown, along with the Learning and Development project. With the major components now delivered, the programme is focused on further development of the central digital platform. Evaluation planning is underway, with an interim evaluation planned to assess the first year of delivery, ahead of full evaluation after 5 years. We anticipate the programme to enter closure as planned at the end of 2025/26.","startDate":"2021-01-01","endDate":"2026-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2025 to 31/03/2026. This is primarily due to the following factors‚ The project end date was moved to 31/03/2026 in financial year 23/24, as a result of the later than anticipated royal assent of the Procurement Act in October 2023. There has been no further change to project end date during 24/25.","fyBaseline":10.35,"fyForecast":8.98,"fyVariance":13.24,"varianceNarrative":"The budget variance is -13%. This is primarily due to the following factors‚ There has been some underspend on the central digital platform project in 2024/25, largely relating to slight delays and therefore reduced costs relating to hosting, data reporting and analytics development work (moving the development work into 2025/26). This did not affect the successful launch of the platform and wider programme in February 2025.","wholeLifeCost":31.5,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 31.5. This is primarily due to the following factors‚ The project's baseline has stabilised at £31.5m and expected whole life costs are in line with this.","benefits":205.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 205. This is primarily due to the following factors‚ Benefits realisation will start later than previously planned due to delays in the commencement act, causing the figure to remain stable.","themes":["Cost & funding","Commercial & supply chain","Technical & integration","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors‚ The programme achieved a successful go-live on the 24th February 2025 as planned, with the commencement of the Procurement Act and successful launch of…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":0,"attentionScore":11,"attentionReasons":["In-year forecast variance is +32.0%"]},{"id":"MOD_0134_2122-Q1","year":2026,"name":"TEUTATES","department":"MOD","category":"Military Capability","description":"As part of the 2010 Lancaster House Agreements, a Treaty was established on a joint radiographic/hydrodynamics capability with France known as TEUTATES. The trials will be in a jointly operated facility but conducted on a national basis and are needed to underwrite the safety and performance of our nuclear weapon stockpile. TEUTATES covers the joint construction, funding, and operation of a new hydrodynamics facility in France, at Epure, near Dijon, and a technology development centre and interim firing point in the UK at the Atomic Weapons Establishment, at Aldermaston. The TEUTATES facilities will enable each country to undertake hydrodynamic experiments in a secure environment. The hydrodynamic facilities use radiography to measure the performance of materials at extremes of temperature and pressure. This enables us to model the performance and safety of the nuclear weapons in our current stockpile without undertaking nuclear explosive tests, and will make an important contribution to assuring the performance, safety and reliability of our next generation of nuclear weapons.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 27 - International relations","startDate":"2013-04-01","endDate":"2030-07-01","scheduleNarrative":"Exempt under Section 27 - International relations","fyBaseline":27.0,"fyForecast":27.0,"fyVariance":27.0,"varianceNarrative":"Exempt under Section 27 – International relations","wholeLifeCost":null,"costNarrative":"Exempt under Section 27 - International relations","benefits":null,"benefitsNarrative":"Exempt under Section 27 - International relations","themes":[],"evidenceExcerpt":"Exempt under Section 27 - International relations Exempt under Section 27 - International relations","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"MOD_0134_2122-Q1","year":2022,"name":"TEUTATES","department":"MOD","category":"Military Capability","description":"Exempt under Section 24 of the Freedom of Information Act 2000 (National security)","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 24 of the Freedom of Information Act 2000 (National security)","startDate":null,"endDate":null,"scheduleNarrative":"Exempt under Section 24 of the Freedom of Information Act 2000 (National security)","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 24 of the Freedom of Information Act 2000 (National security)","wholeLifeCost":null,"costNarrative":"Exempt under Section 24 of the Freedom of Information Act 2000 (National security)","benefits":null,"benefitsNarrative":"","themes":[],"evidenceExcerpt":"Exempt under Section 24 of the Freedom of Information Act 2000 (National security) Exempt under Section 24 of the Freedom of Information Act 2000 (National security)","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"MOD_0134_2122-Q1","year":2023,"name":"TEUTATES","department":"MOD","category":"Military Capability","description":"As part of the 2010 Lancaster House Agreements; a Treaty was established on a joint radiographic/hydrodynamics capability with France known as Teutates. The trials will be in a jointly operated facility but conducted on a national basis and are needed to underwrite the safety and performance of our nuclear weapon stockpile. Teutates covers the joint construction; funding; and operation of a new hydrodynamics facility in France; at Epure; near Dijon; and a technology development centre and interim firing point in the UK at the Atomic Weapons Establishment; at Aldermaston. The Teutates facilities will enable each country to undertake hydrodynamic experiments in a secure environment. The hydrodynamic facilities use radiography to measure the performance of materials at extremes of temperature and pressure. This enables us to model the performance and safety of the nuclear weapons in our current stockpile without undertaking nuclear explosive tests; and will make an important contribution to assuring the performance; safety and reliability of our next generation of nuclear weapons.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 27 of the Freedom of Information Act 2000 (International Relations)","startDate":"2013-04-01","endDate":"2064-03-31","scheduleNarrative":"The project's end-date at 22/23-Q4 is 2064-03-31. This is primarily due to the following factors. Exempt under Section 27 of the Freedom of Information Act 2000 (International Relations)","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 27 of the Freedom of Information Act 2000 (International Relations)","wholeLifeCost":null,"costNarrative":"Exempt under Section 27 of the Freedom of Information Act 2000 (International Relations)","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This programme does not report cashable benefits. Its aim is to provision the armed forces with the equipment and / or infrastructure required.","themes":[],"evidenceExcerpt":"Exempt under Section 27 of the Freedom of Information Act 2000 (International Relations) The project's end-date at 22/23-Q4 is 2064-03-31. This is primarily due to the following factors. Exempt under Section 27 of the Freedom of Information Act 2000 (International Relations)","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"MOD_0134_2122-Q1","year":2024,"name":"TEUTATES","department":"MOD","category":"Military Capability","description":"As part of the 2010 Lancaster House Agreements; a Treaty was established on a joint radiographic/hydrodynamics capability with France known as Teutates. The programme covers the joint construction; funding; and operation of a new hydrodynamics facility in France; at Epure; near Dijon; and a technology development centre and interim firing point in the UK at the Atomic Weapons Establishment; at Aldermaston. These facilities will enable each country to undertake hydrodynamic experiments in a secure environment. The trials will be in a jointly operated facility but conducted on a national basis and are needed to underwrite the safety and performance of our nuclear weapon stockpile.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Sections 24, 26 and 27 of the Freedom of Information Act 2000","startDate":"2013-04-01","endDate":null,"scheduleNarrative":"Exempt under Sections 24, 26 and 27 of the Freedom of Information Act 2000","fyBaseline":2426272000.0,"fyForecast":2426272000.0,"fyVariance":2426272000.0,"varianceNarrative":"Exempt under Sections 24, 26 and 27 of the Freedom of Information Act 2000","wholeLifeCost":2426272000.0,"costNarrative":"Exempt under Sections 24, 26 and 27 of the Freedom of Information Act 2000","benefits":0.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 0m.","themes":[],"evidenceExcerpt":"Exempt under Sections 24, 26 and 27 of the Freedom of Information Act 2000 Exempt under Sections 24, 26 and 27 of the Freedom of Information Act 2000","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"MOD_0134_2122-Q1","year":2025,"name":"TEUTATES","department":"MoD","category":"Military Capability","description":"As part of the 2010 Lancaster House Agreements, a Treaty was established on a joint radiographic/hydrodynamics capability with France known as Teutates. The trials will be in a jointly operated facility but conducted on a national basis and are needed to underwrite the safety and performance of our nuclear weapon stockpile. Teutates covers the joint construction, funding and operation of a new hydrodynamics facility in France at Epure near Dijon and a technology development centre and interim firing point in the UK. The Teutates facilities will enable each country to undertake hydrodynamic experiments in a secure environment assuring the performance, safety and reliability of our next generation of nuclear weapons.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Section 27 - International relations","startDate":"2013-04-01","endDate":"2064-03-31","scheduleNarrative":"Section 27 - International relations","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 27 - International relations","wholeLifeCost":null,"costNarrative":"Section 27 - International relations","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits","themes":[],"evidenceExcerpt":"Section 27 - International relations Section 27 - International relations","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"MOD_0134_2122-Q1","year":2026,"name":"TEUTATES","department":"MOD","category":"Military Capability","description":"As part of the 2010 Lancaster House Agreements, a Treaty was established on a joint radiographic/hydrodynamics capability with France known as TEUTATES. The trials will be in a jointly operated facility but conducted on a national basis and are needed to underwrite the safety and performance of our nuclear weapon stockpile. TEUTATES covers the joint construction, funding, and operation of a new hydrodynamics facility in France, at Epure, near Dijon, and a technology development centre and interim firing point in the UK at the Atomic Weapons Establishment, at Aldermaston. The TEUTATES facilities will enable each country to undertake hydrodynamic experiments in a secure environment. The hydrodynamic facilities use radiography to measure the performance of materials at extremes of temperature and pressure. This enables us to model the performance and safety of the nuclear weapons in our current stockpile without undertaking nuclear explosive tests, and will make an important contribution to assuring the performance, safety and reliability of our next generation of nuclear weapons.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 27 - International relations","startDate":"2013-04-01","endDate":"2030-07-01","scheduleNarrative":"Exempt under Section 27 - International relations","fyBaseline":27.0,"fyForecast":27.0,"fyVariance":27.0,"varianceNarrative":"Exempt under Section 27 – International relations","wholeLifeCost":null,"costNarrative":"Exempt under Section 27 - International relations","benefits":null,"benefitsNarrative":"Exempt under Section 27 - International relations","themes":[],"evidenceExcerpt":"Exempt under Section 27 - International relations Exempt under Section 27 - International relations","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"MOD_0134_2122-Q1","year":2025,"name":"TEUTATES","department":"MoD","category":"Military Capability","description":"As part of the 2010 Lancaster House Agreements, a Treaty was established on a joint radiographic/hydrodynamics capability with France known as Teutates. The trials will be in a jointly operated facility but conducted on a national basis and are needed to underwrite the safety and performance of our nuclear weapon stockpile. Teutates covers the joint construction, funding and operation of a new hydrodynamics facility in France at Epure near Dijon and a technology development centre and interim firing point in the UK. The Teutates facilities will enable each country to undertake hydrodynamic experiments in a secure environment assuring the performance, safety and reliability of our next generation of nuclear weapons.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Section 27 - International relations","startDate":"2013-04-01","endDate":"2064-03-31","scheduleNarrative":"Section 27 - International relations","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 27 - International relations","wholeLifeCost":null,"costNarrative":"Section 27 - International relations","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits","themes":[],"evidenceExcerpt":"Section 27 - International relations Section 27 - International relations","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":null,"transition":"Not comparable","endDateDeltaDays":-12327,"attentionScore":9,"attentionReasons":["In-year forecast variance is +27.0%"]},{"id":"MOD_0111_1718-Q1","year":2026,"name":"JOINT CRYPT KEY PROGRAMME","department":"MOD","category":"Information and Communications Technology (ICT)","description":"Exempt under Section 23 - Information supplied by, or relating to, bodies dealing with security matters","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 23 - Information supplied by, or relating to, bodies dealing with security matters","startDate":null,"endDate":null,"scheduleNarrative":"Exempt under Section 23 - Information supplied by, or relating to, bodies dealing with security matters","fyBaseline":23.0,"fyForecast":23.0,"fyVariance":23.0,"varianceNarrative":"Exempt under Section 23 – Information supplied by, or relating to, bodies dealing with security matters​","wholeLifeCost":null,"costNarrative":"Exempt under Section 23 - Information supplied by, or relating to, bodies dealing with security matters","benefits":null,"benefitsNarrative":"Exempt under Section 23 - Information supplied by, or relating to, bodies dealing with security matters","themes":[],"evidenceExcerpt":"Exempt under Section 23 - Information supplied by, or relating to, bodies dealing with security matters Exempt under Section 23 - Information supplied by, or relating to, bodies dealing with security matters","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"MOD_0111_1718-Q1","year":2020,"name":"Joint Crypt Key Programme","department":"MOD","category":"ICT","description":"To support the department's Information Assurance Capability.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 26 of Freedom of Information Act 2000 (Defence)","startDate":null,"endDate":null,"scheduleNarrative":"Exempt under Section 26 of Freedom of Information Act 2000 (Defence)","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 26 of Freedom of Information Act 2000 (Defence)","wholeLifeCost":null,"costNarrative":"Exempt under Section 26 of Freedom of Information Act 2000 (Defence)","benefits":null,"benefitsNarrative":"","themes":[],"evidenceExcerpt":"Exempt under Section 26 of Freedom of Information Act 2000 (Defence) Exempt under Section 26 of Freedom of Information Act 2000 (Defence)","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2020","sourceLabel":"IPA Annual Report 2019-20"},{"id":"MOD_0111_1718-Q1","year":2021,"name":"Joint Crypt Key Programme","department":"MOD","category":"Military Capability","description":"Exempt under Section 26 of the Freedom of Information Act 2000 (Defence)","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 26 of the Freedom of Information Act 2000 (Defence)","startDate":null,"endDate":null,"scheduleNarrative":"Exempt under Section 26 of the Freedom of Information Act 2000 (Defence)","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 26 of the Freedom of Information Act 2000 (Defence)","wholeLifeCost":null,"costNarrative":"Exempt under Section 26 of the Freedom of Information Act 2000 (Defence)","benefits":null,"benefitsNarrative":"","themes":[],"evidenceExcerpt":"Exempt under Section 26 of the Freedom of Information Act 2000 (Defence) Exempt under Section 26 of the Freedom of Information Act 2000 (Defence)","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21"},{"id":"MOD_0111_1718-Q1","year":2022,"name":"Joint Crypt Key Programme","department":"MOD","category":"Military Capability","description":"Exempt under Section 26 of Freedom of Information Act 2000 (Defence).","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 26 of Freedom of Information Act 2000 (Defence).","startDate":null,"endDate":null,"scheduleNarrative":"Exempt under Section 26 of Freedom of Information Act 2000 (Defence).","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 26 of Freedom of Information Act 2000 (Defence).","wholeLifeCost":null,"costNarrative":"Exempt under Section 26 of Freedom of Information Act 2000 (Defence).","benefits":null,"benefitsNarrative":"","themes":[],"evidenceExcerpt":"Exempt under Section 26 of Freedom of Information Act 2000 (Defence). Exempt under Section 26 of Freedom of Information Act 2000 (Defence).","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"MOD_0111_1718-Q1","year":2023,"name":"Joint Crypt Key Programme","department":"MOD","category":"Military Capability","description":"Exempt under Section 26 of Freedom of Information Act 2000 (Defence).","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 26 of Freedom of Information Act 2000 (Defence).","startDate":null,"endDate":null,"scheduleNarrative":"Exempt under Section 26 of Freedom of Information Act 2000 (Defence).","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 26 of Freedom of Information Act 2000 (Defence).","wholeLifeCost":null,"costNarrative":"Exempt under Section 26 of Freedom of Information Act 2000 (Defence).","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. The project did not provide departmental-agree monetised benefits at 22/23-Q4.","themes":[],"evidenceExcerpt":"Exempt under Section 26 of Freedom of Information Act 2000 (Defence). Exempt under Section 26 of Freedom of Information Act 2000 (Defence).","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"MOD_0111_1718-Q1","year":2024,"name":"Joint Crypt Key Programme","department":"MOD","category":"Military Capability","description":"Exempt under Section 26 of Freedom of Information Act 2000 (Exempt under Section 26 of the Freedom of Information Act 2000 (Defence)).","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 26 of Freedom of Information Act 2000 (Exempt under Section 26 of the Freedom of Information Act 2000 (Defence)).","startDate":null,"endDate":null,"scheduleNarrative":"Exempt under Section 26 of Freedom of Information Act 2000 (Exempt under Section 26 of the Freedom of Information Act 2000 (Defence)).","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 26 of Freedom of Information Act 2000 (Exempt under Section 26 of the Freedom of Information Act 2000 (Defence)).","wholeLifeCost":null,"costNarrative":"Exempt under Section 26 of Freedom of Information Act 2000 (Exempt under Section 26 of the Freedom of Information Act 2000 (Defence)).","benefits":0.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 0m.","themes":[],"evidenceExcerpt":"Exempt under Section 26 of Freedom of Information Act 2000 (Exempt under Section 26 of the Freedom of Information Act 2000 (Defence)). Exempt under Section 26 of Freedom of Information Act 2000 (Exempt under Section 26 of the Freedom of Information Act 2000 (Defence)).","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"MOD_0111_1718-Q1","year":2025,"name":"JOINT CRYPT KEY PROGRAMME","department":"MoD","category":"Military Capability","description":"Section 23 - Information supplied by, or relating to, bodies dealing with security matters","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Section 23 - Information supplied by, or relating to, bodies dealing with security matters","startDate":null,"endDate":null,"scheduleNarrative":"Section 23 - Information supplied by, or relating to, bodies dealing with security matters","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 23 - Information supplied by, or relating to, bodies dealing with security matters","wholeLifeCost":null,"costNarrative":"Section 23 - Information supplied by, or relating to, bodies dealing with security matters","benefits":null,"benefitsNarrative":"Section 23 - Information supplied by, or relating to, bodies dealing with security matters","themes":[],"evidenceExcerpt":"Section 23 - Information supplied by, or relating to, bodies dealing with security matters Section 23 - Information supplied by, or relating to, bodies dealing with security matters","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"MOD_0111_1718-Q1","year":2026,"name":"JOINT CRYPT KEY PROGRAMME","department":"MOD","category":"Information and Communications Technology (ICT)","description":"Exempt under Section 23 - Information supplied by, or relating to, bodies dealing with security matters","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 23 - Information supplied by, or relating to, bodies dealing with security matters","startDate":null,"endDate":null,"scheduleNarrative":"Exempt under Section 23 - Information supplied by, or relating to, bodies dealing with security matters","fyBaseline":23.0,"fyForecast":23.0,"fyVariance":23.0,"varianceNarrative":"Exempt under Section 23 – Information supplied by, or relating to, bodies dealing with security matters​","wholeLifeCost":null,"costNarrative":"Exempt under Section 23 - Information supplied by, or relating to, bodies dealing with security matters","benefits":null,"benefitsNarrative":"Exempt under Section 23 - Information supplied by, or relating to, bodies dealing with security matters","themes":[],"evidenceExcerpt":"Exempt under Section 23 - Information supplied by, or relating to, bodies dealing with security matters Exempt under Section 23 - Information supplied by, or relating to, bodies dealing with security matters","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"MOD_0111_1718-Q1","year":2025,"name":"JOINT CRYPT KEY PROGRAMME","department":"MoD","category":"Military Capability","description":"Section 23 - Information supplied by, or relating to, bodies dealing with security matters","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Section 23 - Information supplied by, or relating to, bodies dealing with security matters","startDate":null,"endDate":null,"scheduleNarrative":"Section 23 - Information supplied by, or relating to, bodies dealing with security matters","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 23 - Information supplied by, or relating to, bodies dealing with security matters","wholeLifeCost":null,"costNarrative":"Section 23 - Information supplied by, or relating to, bodies dealing with security matters","benefits":null,"benefitsNarrative":"Section 23 - Information supplied by, or relating to, bodies dealing with security matters","themes":[],"evidenceExcerpt":"Section 23 - Information supplied by, or relating to, bodies dealing with security matters Section 23 - Information supplied by, or relating to, bodies dealing with security matters","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":null,"transition":"Not comparable","endDateDeltaDays":null,"attentionScore":8,"attentionReasons":["In-year forecast variance is +23.0%"]},{"id":"HO_0047_2122-Q1","year":2026,"name":"RADIOLOGICAL AND NUCLEAR CHANGE PROGRAMME (RNCP)","department":"HO","category":"Government Transformation and Service Delivery","description":"Exempt under Section 24 - National security","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 24 - National security","startDate":null,"endDate":null,"scheduleNarrative":"Exempt under Section 24 - National security","fyBaseline":24.0,"fyForecast":24.0,"fyVariance":24.0,"varianceNarrative":"Exempt under Section 24 – National Security​","wholeLifeCost":null,"costNarrative":"Exempt under Section 24 - National security","benefits":null,"benefitsNarrative":"Exempt under Section 24 - National security","themes":[],"evidenceExcerpt":"Exempt under Section 24 - National security Exempt under Section 24 - National security","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"HO_0047_2122-Q1","year":2022,"name":"Nuclear Security Portfolio","department":"HO","category":"Government Transformation and Service Delivery","description":"Nuclear Security Portfolio has been established to maintain and improve the UK's defences from radiological and nuclear terrorism, and its preparedness for such a risk.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 24 of the Freedom of Information Act 2000 (National security)","startDate":"2021-03-26","endDate":"2025-03-31","scheduleNarrative":"Exempt under Section 24 of the Freedom of Information Act 2000 (National security)","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Early planning GMPP project (The project has not yet passed SOC, or its programme equivalent)","wholeLifeCost":528.0,"costNarrative":"Exempt under Section 22 of the Freedom of Information Act 2000 (Information intended for future publication)","benefits":null,"benefitsNarrative":"","themes":[],"evidenceExcerpt":"Exempt under Section 24 of the Freedom of Information Act 2000 (National security) Exempt under Section 24 of the Freedom of Information Act 2000 (National security)","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"HO_0047_2122-Q1","year":2023,"name":"Nuclear Security Portfolio","department":"HO","category":"Government Transformation and Service Delivery","description":"Nuclear Security Portfolio has been established to maintain and improve the UKs defences from radiological and nuclear terrorism, and its preparedness for such a risk.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 24 of the Freedom of Information Act 2000 (National security)","startDate":"2021-03-26","endDate":"2023-09-30","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 decreased from 2025-03-31 to 2023-09-30. This is primarily due to the following factors. Exempt under Section 24 of the Freedom of Information Act 2000 (National security)","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 24 of the Freedom of Information Act 2000 (National security)","wholeLifeCost":null,"costNarrative":"Exempt under Section 24 of the Freedom of Information Act 2000 (National security)","benefits":null,"benefitsNarrative":"Exempt under Section 24 of the Freedom of Information Act 2000 (National security)","themes":["Cost & funding"],"evidenceExcerpt":"Exempt under Section 24 of the Freedom of Information Act 2000 (National security) Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 decreased from 2025-03-31 to 2023-09-30. This is primarily due to the following factors. Exempt under Section 24 of the Freedom of Information Act 2000 (National security)","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"HO_0047_2122-Q1","year":2024,"name":"Radiological and Nuclear Change Programme (RNCP)","department":"HO","category":"Government Transformation and Service Delivery","description":"Nuclear Change Portfolio has been established to maintain and improve the UK's defences from radiological and nuclear terrorism and it's preparedness for such a risk.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 24 of the Freedom of Information Act 2000 (National security)","startDate":"2021-03-26","endDate":null,"scheduleNarrative":"Exempt under Section 24 of the Freedom of Information Act 2000 (National security)","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 24 of the Freedom of Information Act 2000 (National security)","wholeLifeCost":null,"costNarrative":"Exempt under Section 24 of the Freedom of Information Act 2000 (National security)","benefits":null,"benefitsNarrative":"Exempt under Section 24 of the Freedom of Information Act 2000 (National security)","themes":[],"evidenceExcerpt":"Exempt under Section 24 of the Freedom of Information Act 2000 (National security) Exempt under Section 24 of the Freedom of Information Act 2000 (National security)","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"HO_0047_2122-Q1","year":2025,"name":"RADIOLOGICAL AND NUCLEAR CHANGE PROGRAMME (RNCP)","department":"HO","category":"Government Transformation and Service Delivery","description":"Section 24 - National security","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Section 24 - National security","startDate":null,"endDate":null,"scheduleNarrative":"Section 24 - National security","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 24 - National security","wholeLifeCost":null,"costNarrative":"Section 24 - National security","benefits":null,"benefitsNarrative":"Section 24 - National security","themes":[],"evidenceExcerpt":"Section 24 - National security Section 24 - National security","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"HO_0047_2122-Q1","year":2026,"name":"RADIOLOGICAL AND NUCLEAR CHANGE PROGRAMME (RNCP)","department":"HO","category":"Government Transformation and Service Delivery","description":"Exempt under Section 24 - National security","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 24 - National security","startDate":null,"endDate":null,"scheduleNarrative":"Exempt under Section 24 - National security","fyBaseline":24.0,"fyForecast":24.0,"fyVariance":24.0,"varianceNarrative":"Exempt under Section 24 – National Security​","wholeLifeCost":null,"costNarrative":"Exempt under Section 24 - National security","benefits":null,"benefitsNarrative":"Exempt under Section 24 - National security","themes":[],"evidenceExcerpt":"Exempt under Section 24 - National security Exempt under Section 24 - National security","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"HO_0047_2122-Q1","year":2025,"name":"RADIOLOGICAL AND NUCLEAR CHANGE PROGRAMME (RNCP)","department":"HO","category":"Government Transformation and Service Delivery","description":"Section 24 - National security","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Section 24 - National security","startDate":null,"endDate":null,"scheduleNarrative":"Section 24 - National security","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 24 - National security","wholeLifeCost":null,"costNarrative":"Section 24 - National security","benefits":null,"benefitsNarrative":"Section 24 - National security","themes":[],"evidenceExcerpt":"Section 24 - National security Section 24 - National security","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":null,"transition":"Not comparable","endDateDeltaDays":null,"attentionScore":8,"attentionReasons":["In-year forecast variance is +24.0%"]},{"id":"DFT_0046_2021-Q2","year":2026,"name":"EAST WEST RAIL CONNECTION STATE 1","department":"DFT","category":"Infrastructure and Construction","description":"East West Rail (EWR) is a new railway connecting towns and cities across the Oxford-Cambridge growth corridor. The Government has identified the corridor as a key pillar of its economic growth mission – by delivering new east-west connectivity and removing existing constraints to growth, EWR is projected to support up to 100,000 new homes, tens of thousands of new jobs and it is expected to add £6.7bn to regional GVA each year by 2050. The EWR programme is structured around the phased introduction of passenger services from the mid 2020s to the mid-late 2030s. The railway will deliver shorter journey times between key economic centres; provide greener public transport and new paths for rail freight; and provide interchanges with major rail lines, supporting onward travel across the country. It will provide a total of 8 new stations, including at Cambridge East and redevelop existing stations unlocking opportunities for growth/regeneration along the corridor. Phase 1 (formerly Connection Stage 1) of the delivery programme relates to services between Oxford and Bletchley / Milton Keynes and is the first phase of the wider EWR programme. Major construction was completed in June 2025 and freight services are now running on this section. The Department continues to work closely with Chiltern Railways and other partners to confirm a start date for the first EWR passenger services between Oxford and Milton Keynes.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 43 - Commercial interests, Section 35 - Formulation of government policy","startDate":"2011-11-30","endDate":null,"scheduleNarrative":"Exempt under Section 35 - Formulation of government policy, Section 43 - Commercial interests","fyBaseline":13.78,"fyForecast":16.53,"fyVariance":19.9,"varianceNarrative":"The variance is due to delay of the entry into service of passenger services.","wholeLifeCost":null,"costNarrative":"Exempt under Section 35 - Formulation of government policy, Section 43 - Commercial interests","benefits":3847.15,"benefitsNarrative":"Phase 1 is in final delivery stages. Benefits are being captured via an EWR Company evaluation exercise. Some benefits will not be fully realised without progression of the later phases of EWR through Bedford to Cambridge.","themes":["Commercial & supply chain","Delivery & schedule"],"evidenceExcerpt":"Exempt under Section 43 - Commercial interests, Section 35 - Formulation of government policy Exempt under Section 35 - Formulation of government policy, Section 43 - Commercial interests","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"DFT_0046_2021-Q2","year":2021,"name":"East West Rail Configuration State 1","department":"DFT","category":"Infrastructure and Construction","description":"The East West Rail (EWR) programme will create a rail link from Oxford to Cambridge, and is a key part of the government's ambition for the Oxford to Cambridge Arc. EWR is being delivered as a single integrated programme, structured around the phased introduction of services (Connection Stages). East West Rail Connection Stage 1 (CS1) delivers services between Oxford and Bletchley/Milton Keynes. CS1 will re-construct and upgrade a partly disused railway between Bicester and Bletchley. This will allow for the introduction of new passenger services, improving connectivity and journey times along the corridor to support transport, housing and economic growth needs.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber.This is primarily due to the following factors: Although challenges remain (such as delivery integration with High Speed 2), the project has improved its position over the past 12 months and made progress mitigating certain risks. Key milestones have been reached and, following the 2020 Spending Review, HMT released a further �760m of funding towards delivery of the scheme.","startDate":"2011-11-30","endDate":"2025-09-01","scheduleNarrative":"The project end-date is 01 September 2025. This is primarily due to the following factors: The schedule for East West Rail (EWR) Connection Stage 1 remains ambitious, but achievable. The release of funding following the 2020 Spending Review, enabled Network Rail to enter into a target price contract for the construction phase and keep the project on schedule. Good progress has been made against important infrastructure and strategy milestones, but there is still significant work required to ensure successful delivery, including developing a suitable operating model and timetable.","fyBaseline":217.52,"fyForecast":209.94,"fyVariance":-3.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":1359.5,"costNarrative":"The projects Baseline Whole Life Cost is �1359.50m. This is primarily due to the following factors: Financials represent scheme delivery costs, rather than whole life costs. Costs in the short term largely represent the capital expenditure to deliver infrastructure, through the East West Rail Alliance. This projection includes risk elements and known scope uncertainties.","benefits":null,"benefitsNarrative":"","themes":["Delivery & schedule","Cost & funding","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber.This is primarily due to the following factors: Although challenges remain (such as delivery integration with High Speed 2), the project has improved its position over the past 12 months and made progress mitigating certain risks. Key milestones have been reached and,…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21"},{"id":"DFT_0046_2021-Q2","year":2022,"name":"East West Rail Configuration State 1","department":"DFT","category":"Infrastructure and Construction","description":"The East West Rail (EWR) scheme will create a rail link from Oxford to Cambridge, and is a key part of the government's ambition for the Oxford to Cambridge Arc. EWR is being delivered as a single integrated programme, structured around the phased introduction of services (Connection Stages). East West Rail Connection Stage 1 (CS1) delivers services between Oxford and Bletchley/Milton Keynes. CS1 will re-construct and upgrade a partly disused railway between Bicester and Bletchley. This will allow for the introduction of new passenger services, improving connectivity and journey times along the corridor to support transport and economic growth needs.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 remained at Amber. The project is progressing well and is largely on budget and schedule to deliver services by 2025. Infrastructure works have progressed well, such as those at Bletchley Flyover, and the project has made headway mitigating certain delivery risks. However, challenges still remain, including delivery integration with High Speed 2, which has the potential to impact entry into service and are being monitored and assessed closely. Operational readiness planning is a priority focus for the project.","startDate":"2011-11-30","endDate":"2025-09-01","scheduleNarrative":"Compared to 2021-Q4, your project end-date remained scheduled to finish on 01 SEP 2025. This is primarily due to the following factors: Overall the schedule remains ambitious, but achievable. Good progress has been made against important infrastructure milestones, including at Bletchley Flyover and Winslow Station. There is now increasing focus on ensuring operational readiness, for entry into service by 2025. Timetable development and progression of the operating model are important areas for progression.","fyBaseline":330.87,"fyForecast":264.98,"fyVariance":-20.0,"varianceNarrative":"The budget variance exceeds 5%. There were slight delays following the production of the baseline for the business case. Additionally, over the past 12 months there has been updated planning assumptions which have changed the profile of project spend. Certain risk forecasts are now being realised in FY2022/23, and variance is also driven by some minor delays to earthworks and structures.","wholeLifeCost":1353.0,"costNarrative":"Compared to 2021-Q4, the projects Baseline Whole Life Cost decreased from 1359.50 (£m) to 1353.13 (£m). This is primarily due to the following factors: The whole life costs for the project have been adjusted slightly to align with the approved business case. These figures represent scheme delivery costs, rather than whole life costs. Project spend largely represents the capital expenditure to deliver infrastructure, through the East West Rail Alliance.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Technical & integration"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 remained at Amber. The project is progressing well and is largely on budget and schedule to deliver services by 2025. Infrastructure works have progressed well, such as those at Bletchley Flyover, and the project has made headway…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"DFT_0046_2021-Q2","year":2023,"name":"East West Rail Configuration State 1","department":"DFT","category":"Infrastructure and Construction","description":"The East West Rail (EWR) scheme will create a rail link from Oxford to Cambridge, and is a key part of the governments ambition for the Oxford to Cambridge Arc. EWR is being delivered as a single integrated programme, structured around the phased introduction of services (Connection Stages). East West Rail Connection Stage 1 (CS1) delivers services between Oxford and Bletchley/Milton Keynes. CS1 will re-construct and upgrade a partly disused railway between Bicester and Bletchley. This will allow for the introduction of new passenger services, improving connectivity and journey times along the corridor to support transport and economic growth needs.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. The project is progressing well and is largely on budget and schedule to deliver services by 2025. The project has made good headway, mitigating certain delivery risks. Improved delivery integration with HS2 Ltd has enhanced the management of ongoing challenges for handover in the Calvert Integration area. Operational readiness for EWR CS1 remains a priority focus. In April 2023 the Department issued a Prior Information Notice that, subject to the outcome of negotiations, Chiltern will operate EWR CS1 Services.","startDate":"2011-11-30","endDate":"2025-09-01","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2025-09-01. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2025-09-01. This is primarily due to the following factors. Overall, the schedule remains ambitious but achievable. Good progress has been made against important infrastructure milestones, including the completion of all earthworks and significant progress on track laying. The biggest risk to schedule remains the successful handover of the Calvert integration area from HS2 to EWR later this year. Important progress is being made to ensure operational readiness and the department is progressing negotiations with Chiltern at pace to formally appoint an operator for CS1 services.","fyBaseline":241.45,"fyForecast":190.37,"fyVariance":-21.0,"varianceNarrative":"The budget variance exceeds 5%. Updated planning assumptions have changed the forecast of spend, with some construction activity due to take place in later financial years than was assumed at FBC in December 2020. Whilst spend has been reforecast in this way the project continues to perform well against it's overall Anticipated Final Cost position","wholeLifeCost":1353.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 remained at 1353m. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 remained at 1353m. This is primarily due to the following factors. The whole life costs for the project have align with the approved business case. These figures represent scheme delivery costs, rather than whole life costs. Project spend largely represents the capital expenditure to deliver infrastructure, through the East West Rail Alliance. Current forecasts show the Anticipated Final Costs to be lower than the Baseline Whole Life Cost and the programme is therefore looking to rebaseline appropriately.","benefits":2649.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 2649m. The programme has developed the appropriate benefits management documentation and processes. However, the final benefits realisation position is uncertain and dependent on post-Covid travel patterns, housing and job creation; as well as the realisation of later connection stages extending services to Bedford and Cambridge. Please note the 2,654m is a nominal value and has been uplifted for each year across the appraisal period. The 574m/740m are appraisal values in 2010 prices","themes":["Cost & funding","Delivery & schedule","Technical & integration","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. The project is progressing well and is largely on budget and schedule to deliver services by 2025. The project has made good headway, mitigating certain delivery…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"DFT_0046_2021-Q2","year":2024,"name":"East West Rail Configuration State 1","department":"DFT","category":"Infrastructure and Construction","description":"The East West Rail (EWR) scheme will create a rail link from Oxford to Cambridge, and is a key part of the government's ambition for the Oxford to Cambridge Arc. EWR is being delivered as a single integrated programme, structured around the phased introduction of services (Connection Stages). East West Rail Connection Stage 1 (CS1) delivers services between Oxford and Bletchley/Milton Keynes._x000D_ _x000D_ CS1 will re-construct and upgrade a partly disused railway between Bicester and Bletchley. This will allow for the introduction of new passenger services, improving connectivity and journey times along the corridor to support transport and economic growth needs.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The project is progressing well and is largely on budget and schedule to deliver services by 2025. Infrastructure works have been completed and the Heads of Terms with the operator have been agreed and signed off. There are risks around delivery of rolling stock, mode of operation and ensuring there are enough drivers trained for the start of services. Operational readiness planning is a priority focus for the project.","startDate":"2011-11-30","endDate":"2025-09-01","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2025-09-01. This is primarily due to the following factors. Overall the schedule remains ambitious but achieveable. Good progress has been made against important infrastructure milestones, including the completion of all Earthworks and completion of track laying. Imporant progress is being made to ensure operational readiness for entry into service by 2025.","fyBaseline":124.82,"fyForecast":117.86,"fyVariance":-6.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. In year variance driven by risk funding that has been brought forward to cover the cost of mitigating industrial action (which impacted track delays) and HS2 costs","wholeLifeCost":1353.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 remained at 1353m. This is primarily due to the following factors. The whole life costs for the project have been adjusted slightly to align with the approved business case. These figures represent scheme delivery costs, rather than whole life costs. Project spend largely represents the capital expenditure to deliver infrastructure, through the East West Rail Alliance.","benefits":2649.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 2649m. The programme has developed the appropriate benefits management documentation and processes. However, the final benefits realisation position is uncertain and dependent on post-Covid travel patterns, housing and job creation; as well as the realisation of later connection stages extending services to Bedford and Cambridge. Please note the 2,654m is a nominal value and has been uplifted for each year across the appraisal period. The 574m/740m are appraisal values in 2010 prices","themes":["Cost & funding","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The project is progressing well and is largely on budget and schedule to deliver services by 2025. Infrastructure works have been completed and the Heads of Terms…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"DFT_0046_2021-Q2","year":2025,"name":"EAST WEST RAIL CONNECTION STATE 1","department":"DfT","category":"Infrastructure and Construction","description":"The East West Rail (EWR) scheme will create a rail link from Oxford to Cambridge, and is a key part of the government’s ambition for the Oxford to Cambridge growth corridor. EWR is being delivered as a single integrated programme, structured around the phased introduction of services (Connection Stages). East West Rail Connection Stage 1 (CS1) delivers services between Oxford and Bletchley/Milton Keynes. CS1 will reconstruct and upgrade a partly disused railway between Bicester and Bletchley. This will allow for the introduction of new passenger services, improving connectivity and journey times along the corridor to support transport and economic growth needs.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The project remains broadly on budget and to schedule. The Deed of Amendment with Chiltern Railways has been signed, which officially onboards them as the Train Operating Company for CS1 services. Risk still remains over the trade union response to the mode of operation decision and how this may affect proposed time schedules to enter into service. Operational readiness planning remains a key priority focus for the project to deliver services by the end of 2025.","startDate":"2011-11-30","endDate":"2025-09-01","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 01/09/2025. This is primarily due to the following factors‚ Overall the schedule remains ambitious but achievable. There are concerns regarding entry into service, which has been delayed due to awaiting the signing of the Deed of Amendment and a decision on mode of operation, which in turn has delayed driver training. Progress is being made with stakeholders to ensure operational readiness for entry into service by 2025.","fyBaseline":124.82,"fyForecast":117.86,"fyVariance":5.58,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ In year variance driven by risk funding that has been brought forward to cover the cost of some minor snagging issues.","wholeLifeCost":1353.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 1353. This is primarily due to the following factors‚ The whole life costs for the project have been adjusted slightly to align with the approved business case. These figures represent scheme delivery costs, rather than whole life costs. Project spend largely represents the capital expenditure to deliver infrastructure, through the East West Rail Alliance.","benefits":2649.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 2649. This is primarily due to the following factors‚ CS1 is in delivery and expected to Enter into Service (EiS) in 2025. Some benefits will not be fully achieved without progression of later stages through Bedford to Cambridge (CS2/3).","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The project remains broadly on budget and to schedule. The Deed of Amendment with Chiltern Railways has been signed, which officially onboards them as the Train…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"DFT_0046_2021-Q2","year":2026,"name":"EAST WEST RAIL CONNECTION STATE 1","department":"DFT","category":"Infrastructure and Construction","description":"East West Rail (EWR) is a new railway connecting towns and cities across the Oxford-Cambridge growth corridor. The Government has identified the corridor as a key pillar of its economic growth mission – by delivering new east-west connectivity and removing existing constraints to growth, EWR is projected to support up to 100,000 new homes, tens of thousands of new jobs and it is expected to add £6.7bn to regional GVA each year by 2050. The EWR programme is structured around the phased introduction of passenger services from the mid 2020s to the mid-late 2030s. The railway will deliver shorter journey times between key economic centres; provide greener public transport and new paths for rail freight; and provide interchanges with major rail lines, supporting onward travel across the country. It will provide a total of 8 new stations, including at Cambridge East and redevelop existing stations unlocking opportunities for growth/regeneration along the corridor. Phase 1 (formerly Connection Stage 1) of the delivery programme relates to services between Oxford and Bletchley / Milton Keynes and is the first phase of the wider EWR programme. Major construction was completed in June 2025 and freight services are now running on this section. The Department continues to work closely with Chiltern Railways and other partners to confirm a start date for the first EWR passenger services between Oxford and Milton Keynes.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 43 - Commercial interests, Section 35 - Formulation of government policy","startDate":"2011-11-30","endDate":null,"scheduleNarrative":"Exempt under Section 35 - Formulation of government policy, Section 43 - Commercial interests","fyBaseline":13.78,"fyForecast":16.53,"fyVariance":19.9,"varianceNarrative":"The variance is due to delay of the entry into service of passenger services.","wholeLifeCost":null,"costNarrative":"Exempt under Section 35 - Formulation of government policy, Section 43 - Commercial interests","benefits":3847.15,"benefitsNarrative":"Phase 1 is in final delivery stages. Benefits are being captured via an EWR Company evaluation exercise. Some benefits will not be fully realised without progression of the later phases of EWR through Bedford to Cambridge.","themes":["Commercial & supply chain","Delivery & schedule"],"evidenceExcerpt":"Exempt under Section 43 - Commercial interests, Section 35 - Formulation of government policy Exempt under Section 35 - Formulation of government policy, Section 43 - Commercial interests","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"DFT_0046_2021-Q2","year":2025,"name":"EAST WEST RAIL CONNECTION STATE 1","department":"DfT","category":"Infrastructure and Construction","description":"The East West Rail (EWR) scheme will create a rail link from Oxford to Cambridge, and is a key part of the government’s ambition for the Oxford to Cambridge growth corridor. EWR is being delivered as a single integrated programme, structured around the phased introduction of services (Connection Stages). East West Rail Connection Stage 1 (CS1) delivers services between Oxford and Bletchley/Milton Keynes. CS1 will reconstruct and upgrade a partly disused railway between Bicester and Bletchley. This will allow for the introduction of new passenger services, improving connectivity and journey times along the corridor to support transport and economic growth needs.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The project remains broadly on budget and to schedule. The Deed of Amendment with Chiltern Railways has been signed, which officially onboards them as the Train Operating Company for CS1 services. Risk still remains over the trade union response to the mode of operation decision and how this may affect proposed time schedules to enter into service. Operational readiness planning remains a key priority focus for the project to deliver services by the end of 2025.","startDate":"2011-11-30","endDate":"2025-09-01","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 01/09/2025. This is primarily due to the following factors‚ Overall the schedule remains ambitious but achievable. There are concerns regarding entry into service, which has been delayed due to awaiting the signing of the Deed of Amendment and a decision on mode of operation, which in turn has delayed driver training. Progress is being made with stakeholders to ensure operational readiness for entry into service by 2025.","fyBaseline":124.82,"fyForecast":117.86,"fyVariance":5.58,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ In year variance driven by risk funding that has been brought forward to cover the cost of some minor snagging issues.","wholeLifeCost":1353.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 1353. This is primarily due to the following factors‚ The whole life costs for the project have been adjusted slightly to align with the approved business case. These figures represent scheme delivery costs, rather than whole life costs. Project spend largely represents the capital expenditure to deliver infrastructure, through the East West Rail Alliance.","benefits":2649.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 2649. This is primarily due to the following factors‚ CS1 is in delivery and expected to Enter into Service (EiS) in 2025. Some benefits will not be fully achieved without progression of later stages through Bedford to Cambridge (CS2/3).","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The project remains broadly on budget and to schedule. The Deed of Amendment with Chiltern Railways has been signed, which officially onboards them as the Train…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":null,"transition":"Not comparable","endDateDeltaDays":null,"attentionScore":7,"attentionReasons":["In-year forecast variance is +19.9%"]},{"id":"DLUHC_0135_2223-Q1","year":2026,"name":"Levelling Up Home Building Fund","department":"MHCLG","category":"Infrastructure and Construction","description":"The Home Building Fund supports small and medium sized housebuilders, infrastructure developers and residential development lenders to grow and increase supply. The fund also aims to diversify and build resilience in the housing market, foster innovation including Modern Methods of Construction and leverage greater private investment into housebuilding. Funding is provided on a recoverable basis through direct lending, equity into partnership arrangements and lending alliances with other lenders. This helps market participants to grow and creates an environment where prospective new entrants, including institutional investors, feel confident and supported to enter the residential sector and existing operators are able to increase their resilience and develop a trading record that will assist them in scaling up their businesses successfully.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Green. Most funding has been committed, with enough headroom to support projects that need further investment. Delivery is on track to meet or exceed the c.54,000 homes target, with revised forecasts increasing expected delivery to around 69,000 homes. This reflects strong progress in securing new commitments during 2025/26.","startDate":"2020-11-25","endDate":"2032-03-31","scheduleNarrative":"There has been no change to the schedule for the programme.","fyBaseline":575.41,"fyForecast":474.75,"fyVariance":17.49,"varianceNarrative":"The budget variance exceeds 5%. The in-year reduction in expenditure was primarily driven by subdued market activity and reduced confidence among Subject Matter Experts (SME). This led to a slower pace in contracting new projects than originally anticipated, resulting in delays to site commencement. Consequently, some planned expenditure for 2025/26 was deferred into the 2026/27 financial year and beyond.","wholeLifeCost":1990.98,"costNarrative":"The WLC remains unchanged, despite the need for some reprofiling across financial years.","benefits":1675.47,"benefitsNarrative":"The monetised benefits relate to those associated with the additional housing impacts of the programme. These benefits are a high level estimate based on the Value for Money (VfM) assessment for projects as they are monitored and flow through the Assessment Framework (AF). The monetised benefits are primarily based on estimating the Land Value Uplift (LVU) from a change in productive use, in line with MHCLG appraisal guidance and the VfM framework for the programme.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Governance & assurance"],"evidenceExcerpt":"The SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Green. Most funding has been committed, with enough headroom to support projects that need further investment. Delivery is on track to meet or exceed the c.54,000 homes target, with revised forecasts increasing expected delivery to around 69,000 homes. This reflects strong progress…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"DLUHC_0135_2223-Q1","year":2023,"name":"Levelling Up Home Building Fund","department":"DLUHC","category":"Infrastructure and Construction","description":"The Levelling Up Home Building Fund will support small and medium sized housebuilders and residential development lenders to diversify and build resilience in the housing market, foster innovation including Modern Methods of Construction and leverage greater private investment into housebuilding. Funding is provided on a recoverable basis through loans or equity into partnership arrangements. This will help create an environment where prospective new entrants, including institutional investors, feel confident and supported to enter the residential sector and existing operators are able to increase their resilience and develop a trading record that will assist them in scaling up their businesses successfully.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 is Amber. This is primarily due to the following factors. The programmes delivery confidence assessment has not yet been assessed by the IPA given this is the first year of operation but has been rated at Amber by the funds Senior Responsible Officer. This reflects the impact of the turbulent economic conditions, during the last financial year (22/23), on the demand for finance by small and medium sized developers (also known as SMEs). Evidence from the market resulted in hesitance to commence and progress new schemes given the economic uncertainty and take-up for funding consequently fell short of original forecasts. However, there has been some level of improvement in market conditions since the new year and additional measures are ongoing or being considered to support delivery and SME developers over the life of the programme","startDate":"2020-11-25","endDate":"2031-03-31","scheduleNarrative":"The project's end-date at 22/23-Q4 is 2031-03-31. This is primarily due to the following factors. The programme remains on schedule for completion by March 2031, being the date by which loans or investments funded under the programme should be realised and/or repaid.","fyBaseline":273.0,"fyForecast":120.0,"fyVariance":-56.0,"varianceNarrative":"The variance to budget exceeds 5% due to the economic challenges for small and medium sized developers arising over the course of the financial year. These included inflationary and supply chain pressures arising following the reopening of the global economy post pandemic, later compounded by rising interest rates, tightening liquidity conditions and weaker consumer demand. This led to a decline in the appetite for developers and investors to acquire and/or develop new sites, with a consequent impact on the demand for development finance and investment.","wholeLifeCost":2206.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 22/23-Q4 is 2206m. This is primarily due to the following factors. There has been no change to the Baseline Whole Life Cost over the course of the year.","benefits":842.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 842m. The project's departmental-agree monetised benefits at 22/23-Q4 is 842m. In addition to the receipts due back from the investment, there are lifetime benefits of the programme, these are based on estimating the social value delivered by the additional housing unlocked by the programme. These have fallen slightly; this is driven by changes to the estimate of Net Present Social Value (NPSV). The primary monetised benefit is the Land Value Uplift (LVU) from a change in productive use of the land towards housing which acts as a proxy of the welfare gain enjoyed by new residents.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain"],"evidenceExcerpt":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 is Amber. This is primarily due to the following factors. The programmes delivery confidence assessment has not yet been assessed by the IPA given this is the first year of operation but has been rated at Amber by the funds Senior Responsible Officer. This reflects the impact…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"DLUHC_0135_2223-Q1","year":2024,"name":"Levelling Up Home Building Fund","department":"DLUHC","category":"Infrastructure and Construction","description":"The Levelling Up Home Building Fund allocates funding to small and medium sized housebuilders and residential development lenders to diversify and build resilience in the housing market as well as foster innovation including Modern Methods of Construction.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. As at March 24: We continue to assess the delivery confidence of the programme as amber.","startDate":"2020-11-25","endDate":"2031-03-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2031-03-31. This is primarily due to the following factors. As at March 24: The project's end-date is March 2031.","fyBaseline":507.0,"fyForecast":191.17,"fyVariance":-62.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. Some costs have moved into future financial years.","wholeLifeCost":2206.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 remained at 2206m. This is primarily due to the following factors. Whole Life Costs have not changed","benefits":842.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 842m. Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 842m.","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. As at March 24: We continue to assess the delivery confidence of the programme as amber. Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"DLUHC_0135_2223-Q1","year":2025,"name":"Levelling Up Home Building Fund","department":"MHCLG","category":"Infrastructure and Construction","description":"The Home Building Fund supports small and medium sized housebuilders and residential development lenders to grow and increase supply. The fund also aims to diversify and build resilience in the housing market, foster innovation including Modern Methods of Construction and leverage greater private investment into housebuilding. Funding is provided on a recoverable basis through direct lending, equity into partnership arrangements and lending alliances with other lenders. This helps market participants to grow and creates an environment where prospective new entrants, including institutional investors, feel confident and supported to enter the residential sector and existing operators are able to increase their resilience and develop a trading record that will assist them in scaling up their businesses successfully.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors‚ The approval of the revised Business Case and extension of the fund at the end of 2024, has allowed for commitments to continue through to the end of March 2026 which is expected will allow for the full fund to be committed and subsequently delivered. The aim is for the full programme allocation to be drawn down and the expectation that the new homes targets will be achieved or exceeded - and the new target brings expected supported delivery up to 54k homes. Performance from 24/25 (with stabler economic & development landscape conditions) and in signing new commitments has enabled significant progress towards meeting final forecasts.","startDate":"2020-11-25","endDate":"2032-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2031 to 31/03/2032. This is primarily due to the following factors‚ The approval of the revised Business Case and extension of the fund at the end of 2024, has allowed for commitments to continue through to the end of March 2026 which will allow for the full fund to be committed and subsequently delivered. The additional period for deployment reflects challenging market conditions and lower sector activity between 2022 and 2024.","fyBaseline":216.94,"fyForecast":257.8,"fyVariance":18.83,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The project has overperformed on fund deployment in 24/25 compared to the original budget. At the end of the year the outturn was overachieved largely due to new projects being brought into the programme that were not originally anticipated at the beginning of the year.","wholeLifeCost":2076.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 2206 to 2076. This is primarily due to the following factors‚ The approval of the revised Business Case. The whole life costs are expected to be lower than originally forecast - but given the impacts of the private sector capital leveraged by the HBF, this reduced spend is still set deliver the forecasted outputs.","benefits":1850.1,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 842 to 1850. This is primarily due to the following factors‚ Changes to the total number of housing outputs since the baseline position with outputs increasing significantly in 24/25 to reflect extension of the programme and revisions made to how the benefits are estimated, which has been informed by monitoring data of live projects being delivered under the programme.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors‚ The approval of the revised Business Case and extension of the fund at the end of 2024, has allowed for commitments to continue through to the end of…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"DLUHC_0135_2223-Q1","year":2026,"name":"Levelling Up Home Building Fund","department":"MHCLG","category":"Infrastructure and Construction","description":"The Home Building Fund supports small and medium sized housebuilders, infrastructure developers and residential development lenders to grow and increase supply. The fund also aims to diversify and build resilience in the housing market, foster innovation including Modern Methods of Construction and leverage greater private investment into housebuilding. Funding is provided on a recoverable basis through direct lending, equity into partnership arrangements and lending alliances with other lenders. This helps market participants to grow and creates an environment where prospective new entrants, including institutional investors, feel confident and supported to enter the residential sector and existing operators are able to increase their resilience and develop a trading record that will assist them in scaling up their businesses successfully.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Green. Most funding has been committed, with enough headroom to support projects that need further investment. Delivery is on track to meet or exceed the c.54,000 homes target, with revised forecasts increasing expected delivery to around 69,000 homes. This reflects strong progress in securing new commitments during 2025/26.","startDate":"2020-11-25","endDate":"2032-03-31","scheduleNarrative":"There has been no change to the schedule for the programme.","fyBaseline":575.41,"fyForecast":474.75,"fyVariance":17.49,"varianceNarrative":"The budget variance exceeds 5%. The in-year reduction in expenditure was primarily driven by subdued market activity and reduced confidence among Subject Matter Experts (SME). This led to a slower pace in contracting new projects than originally anticipated, resulting in delays to site commencement. Consequently, some planned expenditure for 2025/26 was deferred into the 2026/27 financial year and beyond.","wholeLifeCost":1990.98,"costNarrative":"The WLC remains unchanged, despite the need for some reprofiling across financial years.","benefits":1675.47,"benefitsNarrative":"The monetised benefits relate to those associated with the additional housing impacts of the programme. These benefits are a high level estimate based on the Value for Money (VfM) assessment for projects as they are monitored and flow through the Assessment Framework (AF). The monetised benefits are primarily based on estimating the Land Value Uplift (LVU) from a change in productive use, in line with MHCLG appraisal guidance and the VfM framework for the programme.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Governance & assurance"],"evidenceExcerpt":"The SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Green. Most funding has been committed, with enough headroom to support projects that need further investment. Delivery is on track to meet or exceed the c.54,000 homes target, with revised forecasts increasing expected delivery to around 69,000 homes. This reflects strong progress…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"DLUHC_0135_2223-Q1","year":2025,"name":"Levelling Up Home Building Fund","department":"MHCLG","category":"Infrastructure and Construction","description":"The Home Building Fund supports small and medium sized housebuilders and residential development lenders to grow and increase supply. The fund also aims to diversify and build resilience in the housing market, foster innovation including Modern Methods of Construction and leverage greater private investment into housebuilding. Funding is provided on a recoverable basis through direct lending, equity into partnership arrangements and lending alliances with other lenders. This helps market participants to grow and creates an environment where prospective new entrants, including institutional investors, feel confident and supported to enter the residential sector and existing operators are able to increase their resilience and develop a trading record that will assist them in scaling up their businesses successfully.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors‚ The approval of the revised Business Case and extension of the fund at the end of 2024, has allowed for commitments to continue through to the end of March 2026 which is expected will allow for the full fund to be committed and subsequently delivered. The aim is for the full programme allocation to be drawn down and the expectation that the new homes targets will be achieved or exceeded - and the new target brings expected supported delivery up to 54k homes. Performance from 24/25 (with stabler economic & development landscape conditions) and in signing new commitments has enabled significant progress towards meeting final forecasts.","startDate":"2020-11-25","endDate":"2032-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2031 to 31/03/2032. This is primarily due to the following factors‚ The approval of the revised Business Case and extension of the fund at the end of 2024, has allowed for commitments to continue through to the end of March 2026 which will allow for the full fund to be committed and subsequently delivered. The additional period for deployment reflects challenging market conditions and lower sector activity between 2022 and 2024.","fyBaseline":216.94,"fyForecast":257.8,"fyVariance":18.83,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The project has overperformed on fund deployment in 24/25 compared to the original budget. At the end of the year the outturn was overachieved largely due to new projects being brought into the programme that were not originally anticipated at the beginning of the year.","wholeLifeCost":2076.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 2206 to 2076. This is primarily due to the following factors‚ The approval of the revised Business Case. The whole life costs are expected to be lower than originally forecast - but given the impacts of the private sector capital leveraged by the HBF, this reduced spend is still set deliver the forecasted outputs.","benefits":1850.1,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 842 to 1850. This is primarily due to the following factors‚ Changes to the total number of housing outputs since the baseline position with outputs increasing significantly in 24/25 to reflect extension of the programme and revisions made to how the benefits are estimated, which has been informed by monitoring data of live projects being delivered under the programme.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors‚ The approval of the revised Business Case and extension of the fund at the end of 2024, has allowed for commitments to continue through to the end of…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":0,"attentionScore":6,"attentionReasons":["In-year forecast variance is +17.5%"]},{"id":"MOD_0247_2324-Q1","year":2026,"name":"Future Materials Campus","department":"MOD","category":"Military Capability","description":"The Future Materials Campus (FMC) programme will renew existing facilities for the manufacture and storage of nuclear materials, improve science and analysis capabilities, and invest in renewed capability for material recovery.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 24 - National security","startDate":"2023-08-16","endDate":null,"scheduleNarrative":"Exempt under Section 24 - National security","fyBaseline":459.43,"fyForecast":501.64,"fyVariance":9.19,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the budget for Future Materials Campus projects being reduced following a holistic review of the wider warhead portfolio costed plan. Furthermore, forecast estimates from Future Materials Campus programme had not been fully reflected in the budget.","wholeLifeCost":null,"costNarrative":"Exempt under Section 22 - Information intended for future publication","benefits":null,"benefitsNarrative":"Compared to financial year 2024/25-Q4, the project's departmental-agreed monetised benefits at 2025/26-Q4 remained at £0m.","themes":["Cost & funding","Governance & assurance"],"evidenceExcerpt":"Exempt under Section 24 - National security Exempt under Section 24 - National security","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"MOD_0247_2324-Q1","year":2024,"name":"Future Materials Campus","department":"MOD","category":"Military Capability","description":"The Future Materials Campus (FMC) programme will renew existing facilities for the manufacture and storage of nuclear materials, improve science and analysis capabilities, and invest in renewed capability for material recovery.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. Scale, complexity and challenge of the Programme. In 2023 the FMC programme was established that draws together a number of infrastructure facilities into a single programme of activity that when completed will deliver the manufacture and storage of nuclear materials. The projects have interconnected schedules, common activities and overlapping requirements for resources. The change in approach to that of an integrated programme is the most effective means of maximising efficiencies.","startDate":"2023-08-16","endDate":null,"scheduleNarrative":"Exempt under Sections 24 and 26 of the Freedom of Information Act 2000","fyBaseline":673.47,"fyForecast":327.57,"fyVariance":-51.361,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The budget for the Future Material Campus Programme was reduced following a holistic review of the wider warhead portfolio costed plan and in conjunction with forecast estimates from the Future Materials Campus Programme.","wholeLifeCost":222000.0,"costNarrative":"FMC is bringing together a range of projects at differing levels of maturity, with elements of concept development still ongoing. As such the whole life cost modelling and subsequent analysis remains under development.","benefits":0.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 0m.","themes":["Cost & funding","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. Scale, complexity and challenge of the Programme. In 2023 the FMC programme was established that draws together a number of infrastructure facilities into a single programme of activity that when completed will…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"MOD_0247_2324-Q1","year":2025,"name":"Future Materials Campus","department":"MoD","category":"Military Capability","description":"The Future Materials Campus programme will renew existing facilities for the manufacture and storage of nuclear materials, improve science and analysis capabilities, and invest in renewed capability for material recovery.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Section 24 - National security","startDate":"2023-08-16","endDate":null,"scheduleNarrative":"Section 24 - National security","fyBaseline":510.03,"fyForecast":406.19,"fyVariance":20.36,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The budget for Future Materials Campus projects being reduced following a holistic review of the wider warhead portfolio costed plan. Furthermore, forecast estimates from Future Materials Campus programme had not been fully reflected in the budget.","wholeLifeCost":null,"costNarrative":"Section 22 - Information intended for future publication","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits","themes":["Cost & funding","Governance & assurance"],"evidenceExcerpt":"Section 24 - National security Section 24 - National security","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"MOD_0247_2324-Q1","year":2026,"name":"Future Materials Campus","department":"MOD","category":"Military Capability","description":"The Future Materials Campus (FMC) programme will renew existing facilities for the manufacture and storage of nuclear materials, improve science and analysis capabilities, and invest in renewed capability for material recovery.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 24 - National security","startDate":"2023-08-16","endDate":null,"scheduleNarrative":"Exempt under Section 24 - National security","fyBaseline":459.43,"fyForecast":501.64,"fyVariance":9.19,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the budget for Future Materials Campus projects being reduced following a holistic review of the wider warhead portfolio costed plan. Furthermore, forecast estimates from Future Materials Campus programme had not been fully reflected in the budget.","wholeLifeCost":null,"costNarrative":"Exempt under Section 22 - Information intended for future publication","benefits":null,"benefitsNarrative":"Compared to financial year 2024/25-Q4, the project's departmental-agreed monetised benefits at 2025/26-Q4 remained at £0m.","themes":["Cost & funding","Governance & assurance"],"evidenceExcerpt":"Exempt under Section 24 - National security Exempt under Section 24 - National security","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"MOD_0247_2324-Q1","year":2025,"name":"Future Materials Campus","department":"MoD","category":"Military Capability","description":"The Future Materials Campus programme will renew existing facilities for the manufacture and storage of nuclear materials, improve science and analysis capabilities, and invest in renewed capability for material recovery.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Section 24 - National security","startDate":"2023-08-16","endDate":null,"scheduleNarrative":"Section 24 - National security","fyBaseline":510.03,"fyForecast":406.19,"fyVariance":20.36,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The budget for Future Materials Campus projects being reduced following a holistic review of the wider warhead portfolio costed plan. Furthermore, forecast estimates from Future Materials Campus programme had not been fully reflected in the budget.","wholeLifeCost":null,"costNarrative":"Section 22 - Information intended for future publication","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits","themes":["Cost & funding","Governance & assurance"],"evidenceExcerpt":"Section 24 - National security Section 24 - National security","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":null,"transition":"Not comparable","endDateDeltaDays":null,"attentionScore":3,"attentionReasons":["In-year forecast variance is +9.2%"]},{"id":"DEFRA_0015_2122-Q1","year":2026,"name":"NORTHERN IRELAND","department":"DEFRA","category":"Government Transformation and Service Delivery","description":"The Defra Northern Ireland Programme was formed in January 2021 and was led by the Northern Ireland, Biosecurity and Trade Directorate. Its objectives were to ensure an enduring, operable NI/GB boundary for all Defra stakeholders and the ongoing integrity and efficacy of Defra's regulatory regimes in the context of the Windsor Framework, working collaboratively with devolved governments. This was achieved by implementing the UK Government’s commitments under the Windsor Framework, ensuring smooth trade between Great Britain (GB) and NI, while maintaining biosecurity and supporting the UK internal market.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Delivery confidence for the Northern Ireland Programme is green as the Programme successfully closed on time and budget. The programme successfully delivered its objective to implement the Windsor Framework requirements. It delivered 15 projects, including three major schemes covering retail movement, plant health labelling and pet travel. The Programme facilitated the movement of goods and pets with reduced friction, delivered enabling infrastructure, including Sanitary and Phytosanitary (SPS) facilities at ports and implemented digital solutions for compliance and risk-based checks. It has successfully transitioned all NI schemes to enduring Senior Service Ownership under Northern Ireland Strategy & Services.","startDate":"2021-01-01","endDate":"2026-02-11","scheduleNarrative":"The programme implemented multi-disciplinary teams and accelerated delivery to compress timeframes and achieve deliverables. Closing projects in a timely way, paralleled with agile and effective programme management allowed the closure of the programme to be brought forward.","fyBaseline":87.1,"fyForecast":78.46,"fyVariance":9.92,"varianceNarrative":"Budget variance is due to the final figures on actual spend produced at the end of the financial year, compared to the anticipated programme closure figures which formed the baseline. The lower actual spend was due to effective early closure of the Programme which reduced staff costs faster than originally anticipated.","wholeLifeCost":430.55,"costNarrative":"Forecasts were improved in accuracy throughout the delivery year but have now been replaced by known actual spend. This combined with the accelerated and efficient closure of the programme decreased digital costs and reduced the whole life cost of the programme.","benefits":1548.28,"benefitsNarrative":"There has been no change in Programme benefits. The post-programme evaluation is ongoing and will inform any changes in benefits figures.","themes":["Cost & funding","Delivery & schedule","Technical & integration","Workforce & capability"],"evidenceExcerpt":"Delivery confidence for the Northern Ireland Programme is green as the Programme successfully closed on time and budget. The programme successfully delivered its objective to implement the Windsor Framework requirements. It delivered 15 projects, including three major schemes covering retail movement, plant health labelling and pet travel. The Programme…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"DEFRA_0015_2122-Q1","year":2022,"name":"Northern Ireland Programme","department":"DEFRA","category":"Government Transformation and Service Delivery","description":"The Defra Northern Ireland Programme was formed in January 2021 and is led by the newly formed NI Directorate. It aims to ensure an enduring, operable NI/GB boundary for all Defra stakeholders, and the ongoing integrity and efficacy of Defra's regulatory regimes in the context of the NI Protocol, working collaboratively with the devolved administrations. The high-level strategic objectives of the programme are to: . Ensure compliance with the NI Protocol . Mitigate the impacts of the NIP implementation for businesses trading into and out of Northern Ireland . Minimise the impact of NIP implementation on consumers","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 27 of the Freedom of Information Act 2000 (International Relations).","startDate":null,"endDate":null,"scheduleNarrative":"Exempt under Section 27 of the Freedom of Information Act 2000 (International Relations).","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 27 of the Freedom of Information Act 2000 (International Relations).","wholeLifeCost":null,"costNarrative":"Exempt under Section 27 of the Freedom of Information Act 2000 (International Relations).","benefits":null,"benefitsNarrative":"","themes":[],"evidenceExcerpt":"Exempt under Section 27 of the Freedom of Information Act 2000 (International Relations). Exempt under Section 27 of the Freedom of Information Act 2000 (International Relations).","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"DEFRA_0015_2122-Q1","year":2023,"name":"Northern Ireland Programme","department":"DEFRA","category":"Government Transformation and Service Delivery","description":"The Defra Northern Ireland Programme was formed in January 2021 and is led by the NI Directorate. It aims to ensure an enduring, operable NI/GB boundary for all Defra stakeholders, and the ongoing integrity and efficacy of Defras regulatory regimes in the context of the Windsor Framework, working collaboratively with the devolved administrations. The high-level strategic objectives of the programme are to: Ensure compliance with the Windsor Framework Mitigate the impacts of the WF implementation for businesses trading into and out of Northern Ireland Minimise the impact of WF implementation on consumers","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","startDate":null,"endDate":null,"scheduleNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","themes":["Commercial & supply chain"],"evidenceExcerpt":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests. Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"DEFRA_0015_2122-Q1","year":2024,"name":"Northern Ireland Programme","department":"DEFRA","category":"Government Transformation and Service Delivery","description":"The Defra Northern Ireland Programme was formed in January 2021 and is led by the NI Directorate. It aims to ensure an enduring, operable NI/GB boundary for all Defra stakeholders, and the ongoing integrity and efficacy of Defra's regulatory regimes in the context of the Windsor Framework, working collaboratively with the devolved administrations. _x000D_ The high-level strategic objectives of the programme are to: _x000D_ Ensure compliance with the Windsor Framework_x000D_ Mitigate the impacts of the WF implementation for businesses trading into and out of Northern Ireland _x000D_ Minimise the impact of WF implementation on consumers","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. Whilst the programme successfully delivered Phase 1 deliverables on schedule enabling the 1st October launch of NI Retail Movement Scheme (NIRMS) and NI Plant Health Label scheme (NIPHL); our overall delivery confidence for the rest of the programme remains at AMBER. Current work to prepare and baseline plans for Phase 2 was completed on 22/02/2024, with the exception of Post & Parcels project (project 6), draft plan due to be validated in April. Pets will also need to review and baseline its plans.","startDate":"2021-01-01","endDate":"2025-06-01","scheduleNarrative":"The project's end-date at 23/24-Q4 is 2025-06-01. This is primarily due to the following factors. Programme still on track to deliver as planned","fyBaseline":167.69,"fyForecast":101.37,"fyVariance":-40.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The NI Programme has permission to spend to 40m in 23/24 for the Labelling Grant Scheme. Business uptake has been less than originally anticipated and totalling 1.7m; underspend will be surrendered at main estimates. The 23/24 approved position for NI SPS Infrastructure has been revised down (from 58.1m in the business case - capital costs were covered from underspends elsewhere in Defra so did not form a part of the Departments overall Supplementary Estimates bid to HMT.","wholeLifeCost":467.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 23/24-Q4 is 467m. This is primarily due to the following factors. The budgeted whole life cost for the Programme has increased as a result of inclusion of SPS Infrastructure (192.3m) and Labelling (40m).","benefits":0.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 0m. Previous updates were based on two business cases covering MAS and DAS projects. These cases will be superseded by the consolidated Windsor Framework programme business case for Investment Committee consideration in May 2024. Project benefit workshops facilitated by business analysts gather benefit information to make programme level decisions about the availability and robustness of the data/evidence to help determine the confidence level in the realisation of project and programme benefits. Analysts are also leading on refreshing the Theory of Change to integrate Defra's new strategic goals and further consider alignment with new programme outcomes and benefits. _x000D_ _x000D_ The WF Business Case benefit realisation plan and benefit map will include selected project end benefits to be treated as 'intermediary' benefits at programme-level, These intermediary benefits will be used to monitor NID programme end benefits. The development of programme end benefits remain in pursuit of the primary economic benefits of trade continuity between GB and NI and the secondary objective to ensure compliance needed to uphold the Belfast (Good Friday) Agreement.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. Whilst the programme successfully delivered Phase 1 deliverables on schedule enabling the 1st October launch of NI Retail Movement Scheme (NIRMS) and NI Plant Health Label scheme (NIPHL); our overall delivery confidence…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"DEFRA_0015_2122-Q1","year":2025,"name":"NORTHERN IRELAND","department":"DEFRA","category":"Government Transformation and Service Delivery","description":"The Defra Northern Ireland Programme was formed in January 2021 and is led by the NI, Biosecurity, and Trade Directorate. It aims to ensure an enduring, operable NI/GB boundary for all Defra stakeholders, and the ongoing integrity and efficacy of Defra’s regulatory regimes in the context of the Windsor Framework, working collaboratively with the devolved governments. The programme is committed to implementing the Windsor Framework in good faith and taking all steps necessary to protect the UK’s internal market.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Following the election and the Government's focus on full and faithful implementation of the Windsor Framework we rebaselined delivery plans. This enabled successful delivery and early closure of projects, alongside a refreshed programme business case. This shifted the programme from 'red' status to 'amber'. Challenges remain, including tight timescales (although key milestones are on track), limited contingency levels, and identification of resource to support delivery and movement to enduring business as usual. The prioritisation of stakeholder engagement to ensure all partners are involved, content and reassured requires a high level of focus and resource to drive progress. The complexities of this process contribute to the programme's amber status.","startDate":"2021-01-01","endDate":"2026-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 01/06/2025 to 31/03/2026. This is primarily due to the following factors‚ The Programme refined the planned decommissioning of Sanitary/Phytosanitary facilities. This amended the schedule for this decommissioning and expanded the length of time required for completion. The programme is now targeted for closure on 31 March 2026, while defining milestone and legislative timelines through work with partners.","fyBaseline":178.1,"fyForecast":178.1,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":544.46,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 467 to 544. This is primarily due to the following factors‚ As part of the spending review, costs were refined and extrapolated across the whole programme to better define the whole life cost. Digital costs increased, as did costs for the Movement Assistance Scheme (reimbursement for costs of certification). The costs of infrastructure for Sanitary/Phytosanitary costs increased, as did funding for operational delivery partners. In addition, the programme business as usual costs were extended to include delivery after programme closure through to FY 32/33.","benefits":1548.28,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 0 to 1548. This is primarily due to the following factors‚ The variation between the financial year reports reflects the progression of the business cases into a more comprehensive Programme Business Case. Baseline benefit figures were not available for the 23/24 Q4 report due to a lack of reliable data at the programme level. As the Programme level business case has been refreshed, associated benefits have similarly been updated with improved detail. This encompasses component business cases which have been recently updated and complement the programme business case (reflecting the complexity of the programme structure). Baseline figures have been reworked to reflect the net benefits, mirroring the actual/forecast scenarios more accurately. Following the Programme Business Case approval, benefits analysis and modelling has been improved. Updating the GDP (Gross Domestic Product) deflator for 2023 has updated and changed on benefit values were assessed. These were previously based on real prices for financial year 19/20.","themes":["Delivery & schedule","Cost & funding","Approvals & decisions","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Following the election and the Government's focus on full and faithful implementation of the Windsor Framework we rebaselined delivery plans. This enabled successful…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"DEFRA_0015_2122-Q1","year":2026,"name":"NORTHERN IRELAND","department":"DEFRA","category":"Government Transformation and Service Delivery","description":"The Defra Northern Ireland Programme was formed in January 2021 and was led by the Northern Ireland, Biosecurity and Trade Directorate. Its objectives were to ensure an enduring, operable NI/GB boundary for all Defra stakeholders and the ongoing integrity and efficacy of Defra's regulatory regimes in the context of the Windsor Framework, working collaboratively with devolved governments. This was achieved by implementing the UK Government’s commitments under the Windsor Framework, ensuring smooth trade between Great Britain (GB) and NI, while maintaining biosecurity and supporting the UK internal market.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Delivery confidence for the Northern Ireland Programme is green as the Programme successfully closed on time and budget. The programme successfully delivered its objective to implement the Windsor Framework requirements. It delivered 15 projects, including three major schemes covering retail movement, plant health labelling and pet travel. The Programme facilitated the movement of goods and pets with reduced friction, delivered enabling infrastructure, including Sanitary and Phytosanitary (SPS) facilities at ports and implemented digital solutions for compliance and risk-based checks. It has successfully transitioned all NI schemes to enduring Senior Service Ownership under Northern Ireland Strategy & Services.","startDate":"2021-01-01","endDate":"2026-02-11","scheduleNarrative":"The programme implemented multi-disciplinary teams and accelerated delivery to compress timeframes and achieve deliverables. Closing projects in a timely way, paralleled with agile and effective programme management allowed the closure of the programme to be brought forward.","fyBaseline":87.1,"fyForecast":78.46,"fyVariance":9.92,"varianceNarrative":"Budget variance is due to the final figures on actual spend produced at the end of the financial year, compared to the anticipated programme closure figures which formed the baseline. The lower actual spend was due to effective early closure of the Programme which reduced staff costs faster than originally anticipated.","wholeLifeCost":430.55,"costNarrative":"Forecasts were improved in accuracy throughout the delivery year but have now been replaced by known actual spend. This combined with the accelerated and efficient closure of the programme decreased digital costs and reduced the whole life cost of the programme.","benefits":1548.28,"benefitsNarrative":"There has been no change in Programme benefits. The post-programme evaluation is ongoing and will inform any changes in benefits figures.","themes":["Cost & funding","Delivery & schedule","Technical & integration","Workforce & capability"],"evidenceExcerpt":"Delivery confidence for the Northern Ireland Programme is green as the Programme successfully closed on time and budget. The programme successfully delivered its objective to implement the Windsor Framework requirements. It delivered 15 projects, including three major schemes covering retail movement, plant health labelling and pet travel. The Programme…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"DEFRA_0015_2122-Q1","year":2025,"name":"NORTHERN IRELAND","department":"DEFRA","category":"Government Transformation and Service Delivery","description":"The Defra Northern Ireland Programme was formed in January 2021 and is led by the NI, Biosecurity, and Trade Directorate. It aims to ensure an enduring, operable NI/GB boundary for all Defra stakeholders, and the ongoing integrity and efficacy of Defra’s regulatory regimes in the context of the Windsor Framework, working collaboratively with the devolved governments. The programme is committed to implementing the Windsor Framework in good faith and taking all steps necessary to protect the UK’s internal market.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Following the election and the Government's focus on full and faithful implementation of the Windsor Framework we rebaselined delivery plans. This enabled successful delivery and early closure of projects, alongside a refreshed programme business case. This shifted the programme from 'red' status to 'amber'. Challenges remain, including tight timescales (although key milestones are on track), limited contingency levels, and identification of resource to support delivery and movement to enduring business as usual. The prioritisation of stakeholder engagement to ensure all partners are involved, content and reassured requires a high level of focus and resource to drive progress. The complexities of this process contribute to the programme's amber status.","startDate":"2021-01-01","endDate":"2026-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 01/06/2025 to 31/03/2026. This is primarily due to the following factors‚ The Programme refined the planned decommissioning of Sanitary/Phytosanitary facilities. This amended the schedule for this decommissioning and expanded the length of time required for completion. The programme is now targeted for closure on 31 March 2026, while defining milestone and legislative timelines through work with partners.","fyBaseline":178.1,"fyForecast":178.1,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":544.46,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 467 to 544. This is primarily due to the following factors‚ As part of the spending review, costs were refined and extrapolated across the whole programme to better define the whole life cost. Digital costs increased, as did costs for the Movement Assistance Scheme (reimbursement for costs of certification). The costs of infrastructure for Sanitary/Phytosanitary costs increased, as did funding for operational delivery partners. In addition, the programme business as usual costs were extended to include delivery after programme closure through to FY 32/33.","benefits":1548.28,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 0 to 1548. This is primarily due to the following factors‚ The variation between the financial year reports reflects the progression of the business cases into a more comprehensive Programme Business Case. Baseline benefit figures were not available for the 23/24 Q4 report due to a lack of reliable data at the programme level. As the Programme level business case has been refreshed, associated benefits have similarly been updated with improved detail. This encompasses component business cases which have been recently updated and complement the programme business case (reflecting the complexity of the programme structure). Baseline figures have been reworked to reflect the net benefits, mirroring the actual/forecast scenarios more accurately. Following the Programme Business Case approval, benefits analysis and modelling has been improved. Updating the GDP (Gross Domestic Product) deflator for 2023 has updated and changed on benefit values were assessed. These were previously based on real prices for financial year 19/20.","themes":["Delivery & schedule","Cost & funding","Approvals & decisions","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Following the election and the Government's focus on full and faithful implementation of the Windsor Framework we rebaselined delivery plans. This enabled successful…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":-1,"transition":"Improved","endDateDeltaDays":-48,"attentionScore":3,"attentionReasons":["In-year forecast variance is +9.9%"]},{"id":"DFT_0048_2021-Q3","year":2026,"name":"2ND GENERATION UK SEARCH AND RESCUE AVIATION","department":"DFT","category":"Government Transformation and Service Delivery","description":"The UKSAR2G programme’s purpose is to procure a national UK aviation search and rescue (SAR) service that continues to save lives, protect UK economic interests and continue to comply with International Conventions beyond the end of the existing UKSAR Helicopter contract in 2024-26.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at green. This is primarily due to the programme remaining on track for all air stations to go live under SAR2G by Jan 2027, the project remains within financial approvals and it continues the service continues to undertake Search and Rescue when needed.","startDate":"2019-12-16","endDate":"2027-01-01","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same as last year's published end-date. This is primarily due to the continued forecast for the last air base to have transitioned to SAR2G by Jan 2027.","fyBaseline":196.42,"fyForecast":186.51,"fyVariance":5.04,"varianceNarrative":"The budget variance exceeds 5%. (5.04%) This is primarily due to one aircraft that was due to come online in Q4 not being realised until Period 1 of FY 26/27.","wholeLifeCost":2046.47,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) remained at £1,959.436. This is primarily due to the following factors. Even though there has been some increase in inflation figures some costs have been recovered through KPI relief on those parts of the contract that has transitioned. Although some variance in reported figures and held figures is noted this is due to the NISTA deflation of the figures.","benefits":25465.07,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at £24,474.990. Although some variance in reported figures and held figures is noted this is due to the NISTA deflation of the figures.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at green. This is primarily due to the programme remaining on track for all air stations to go live under SAR2G by Jan 2027, the project remains within financial approvals and it continues the service continues to undertake Search and Rescue when…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"DFT_0048_2021-Q3","year":2021,"name":"UK Second Generation Search & Rescue Aviation Programme","department":"DFT","category":"Government Transformation and Service Delivery","description":"The UK Search and Rescue 2nd Generation (UKSAR2G) programme is the UKs replacement aviation Search and Rescue (SAR) service that will continue to save lives, protect the UKs economic interests and maintains aeronautical compliance with International Conventions beyond 2024.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber/Green.This is primarily due to the following factors: The Gateway Review found that the UKSAR2G Programme is a well-established and constructed programme which seeks to deliver a vital emergency service without a loss of continuity to the current Coastguard aviation services. It praised the clear objectives, strong leadership and sound Governance. The review stated that there is a strong evidence base supporting the programme with robust modelling against which the Programme team can assess future potential solutions. It remarked on the high degree of transparency there has been with the market. The review felt that the strategic and economic cases were particularly compelling with a clear delivery strategy and was complimentary of the amount of stakeholder engagement there has been so far. The review stated that the Programme is inclusive of smaller, agile suppliers who might drive innovation. The review team's assessment was influenced by the need to make greater use of project and programme tools, the impact of IFRS16 has on accounting for leases and affordability more generally, and the complexity of the stakeholder community.","startDate":"2019-12-16","endDate":"2026-12-31","scheduleNarrative":"The project end-date is 31 December 2026. This is primarily due to the following factors: Programme milestones and outputs have consistently been met through 2020/21. Following reassuring feedback from assurance reviews, scrutiny panels (internal and external), a successful IPA Gateway 2 Review and Cabinet and HM Treasury approval of the Outline Business Case. Procurement has been launched and the key milestone of contract award in Q3 2022 remains on target.","fyBaseline":0.0,"fyForecast":0.0,"fyVariance":null,"varianceNarrative":"The GMPP project did not provide data","wholeLifeCost":2606.77,"costNarrative":"The projects Baseline Whole Life Cost is �2606.77m. This is primarily due to the following factors: Should Cost Modelling for the Outline Business Case (OBC) has presented a contract price of �2.607bn incl. irrecoverable VAT for a 10 year operational period. The OBC has cleared DfT's approval boards, the Cabinet Office and HM Treasury. It has been agreed with DfT and HM Treasury that pre-operational costs will be based on a milestone approach and these will be paid to suppliers as services commence at each base under UKSAR2G. This approach means that more costs will be brought forward into the early part of the contract, but the later years will reduce accordingly and the overall effect is a �115m budget saving. The Spending Review submission for 2021 will illustrate this clearly.","benefits":null,"benefitsNarrative":"","themes":["Governance & assurance","Commercial & supply chain","Approvals & decisions","Cost & funding"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber/Green.This is primarily due to the following factors: The Gateway Review found that the UKSAR2G Programme is a well-established and constructed programme which seeks to deliver a vital emergency service without a loss of continuity to the current Coastguard aviation…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21"},{"id":"DFT_0048_2021-Q3","year":2022,"name":"2nd Generation UK Search and Rescue Aviation","department":"DFT","category":"Government Transformation and Service Delivery","description":"The UK Search and Rescue 2nd Generation (UKSAR2G) programme is the UK's replacement aviation Search and Rescue (SAR) and Aerial Surveillance (ASV) services that will continue to save lives, protect the UK's economic interests and maintain aeronautical compliance with International Conventions beyond 2024.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 20/21-Q4, the Delivery Confidence Assessment rating at 21/22-Q4 decreased from Amber/Green to Green. 2021/22 saw the completion of the initial tender evaluation and consensus, Commercial Assurance Board (CAB) Stage 5 and conclusion of a 3 week Negotiation Stage with the Participants and the development of the Invitation to Submit Final Tender (ITSFT). The negotiations demonstrated that the delivery of the programme remains on schedule. Completion of the negotiation stage and the relaxation of Covid-19 restrictions have also led to the removal of several key risks. It is for this reason that the SRO Quality Assessment has been improved from Amber to Green. As Senior Responsible Officer (SRO) I will ensure that the remaining bidder delivers on their negotiated agreements and remains focused on delivering Value for Money. The Gateway Review found that the UKSAR2G Programme is a well-established and constructed programme which seeks to deliver a vital emergency service without a loss of continuity to the current Coastguard aviation services. It praised the clear objectives, strong leadership and sound Governance. The review stated that there is a strong evidence base supporting the programme with robust modelling against which the Programme team can assess future potential solutions. It remarked on the high degree of transparency there has been with the market. The review felt that the strategic and economic cases were particularly compelling with an equally clear delivery strategy. The review was complimentary of the amount of stakeholder engagement there has been so far. The review stated that the Programme is inclusive of smaller, agile suppliers who might drive innovation. The review team's assessment was influenced by the need to make greater use of project and programme tools, the impact of IFRS16 and affordability more generally, and the complexity of the stakeholder community.","startDate":"2019-12-16","endDate":"2026-12-31","scheduleNarrative":"Compared to 2021-Q4, your project end-date remained scheduled to finish on 31 DEC 2026. This is primarily due to the following factors: Programme milestones and outputs have consistently been met through 2021/22. Highlights include the completion of the Selection Questionnaire, Initial Tender and Negotiation Stage. Contract Award remains on target for Q3 2022/23, which will require HM Treasury approval of the Full Business Case, following completion of the Final Tender. Following input from the market, it is considered that the Transition Phase timescale of the programme remains both realistic and achievable.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"The GMPP project did not provide data","wholeLifeCost":2607.0,"costNarrative":"Compared to 2021-Q4,the projects Baseline Whole Life Cost remained at 2606.77 (£m). This is primarily due to the following factors: Should Cost Modelling for the Outline Business Case (OBC), approved by HM Treasury, proposed a contract price of £2.607bn including irrecoverable VAT for a 10 year operational period. It has been agreed with DfT and HM Treasury that pre-operational costs will be based on a milestone approach and these will be paid to suppliers as services commence at each base under UKSAR2G. This approach means that more costs will be brought forward in to the early part of the contract, but the later years' costs will reduce accordingly resulting in an overall £115m budget saving.","benefits":null,"benefitsNarrative":"","themes":["Commercial & supply chain","Governance & assurance","Delivery & schedule","Cost & funding"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Delivery Confidence Assessment rating at 21/22-Q4 decreased from Amber/Green to Green. 2021/22 saw the completion of the initial tender evaluation and consensus, Commercial Assurance Board (CAB) Stage 5 and conclusion of a 3 week Negotiation Stage with the Participants and the development of the Invitation to Submit…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"DFT_0048_2021-Q3","year":2023,"name":"2nd Generation UK Search and Rescue Aviation","department":"DFT","category":"Government Transformation and Service Delivery","description":"The UK Search and Rescue Second Generation (UKSAR2G) programmes is the UK's replacement aviation Search and Rescue (SAR) and Aerial Surveillance and Verification (ASV) services that will continue to save lives, protect the UK's economic interests and maintain aeronautical compliance with International Conventions beyond 2024.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 21/22-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 remained at Green. This is primarily due to the following factors. The tender assessment was completed and the contract awarded to Bristow Helicopters Ltd. The programme is mobilising and regular meetings have been established between the MCA and BHL. Internal workstreams are being established to manage the transition between the old and the new contracts.The Gateway Review found that the Programme is well-established and constructed and seeks to deliver a vital emergency service without loss of continuity.","startDate":"2019-12-16","endDate":"2026-12-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2026-12-31. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2026-12-31. This is primarily due to the following factors. The contract has been awarded and the FBC approved. The contracted schedule maintains the projected end date.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"The GMPP project did not provide data","wholeLifeCost":1959.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 decreased from 2607m. to 1959m. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 decreased from 2607m. to 1959m. This is primarily due to the following factors. The cost of the accepted bid was lower than anticipated and this has been reflected in the Full Business Case which has been approved by DfT and HMT. Milestone payments will be made as each base transitions to service.","benefits":24475.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 24475m. The project departmental-agree Benefits at 22/23-Q4 is 24.5b. The project is in its mobilisation phase. The Search and Recue bases will transition to the new service between October 2024 and January 2027, during which, the benefits will start to be realised as the assets respond to incidents. The actual benefits annual benefits will progressively increase as each base transitions to this new contract. The majority of the benefit value is derived from the lives saved by the service.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 remained at Green. This is primarily due to the following factors. The tender assessment was completed and the contract awarded to Bristow Helicopters Ltd. The programme is mobilising and regular meetings have been established between the…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"DFT_0048_2021-Q3","year":2024,"name":"2nd Generation UK Search and Rescue Aviation","department":"DFT","category":"Government Transformation and Service Delivery","description":"The UK Search and Rescue Second Generation (ULSAR2G) programme is the UK's replacement aviation Search & Rescue (SAR) and Ariel Surveillance (ASV) services that will continue to save lives, protect the UK's economic interests and maintain aeronautical compliance with International Conventions beyond 2024.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Green. This is primarily due to the following factors. The programme is now in the mobilisation phase prior to transition. This is going well with regular meetings between MCA and BHL. Internal workstreams are established and preparing for the transition phase between the old and new contracts._x000D_ _x000D_ The recent Government Internal Assurance Assessment and IPA Gate 4 (Readiness for Service) have found that the programme is well led with well established governance.","startDate":"2019-12-16","endDate":"2026-12-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2026-12-31. This is primarily due to the following factors. The contracted schedule has been reviewed on a regular basis and remains on track for the projected end date.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"The project did not report yearly cost","wholeLifeCost":1959.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 remained at 1959m. This is primarily due to the following factors. The whole Life Cost remains as published in the Full Business Case. Milestone payments will be made as each base transitions into service.","benefits":24475.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 24475m. The project departmental-agree Benefits at 22/23-Q4 is 24.5b. _x000D_ _x000D_ The project is in its mobilisation phase. The Search and Recue bases will transition to the new service between October 2024 and January 2027, during which, the benefits will start to be realised as the assets respond to incidents. The actual benefits annual benefits will progressively increase as each base transitions to this new contract. The majority of the benefit value is derived from the lives saved by the service.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Green. This is primarily due to the following factors. The programme is now in the mobilisation phase prior to transition. This is going well with regular meetings between MCA and BHL. Internal workstreams are established and…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"DFT_0048_2021-Q3","year":2025,"name":"2ND GENERATION UK SEARCH AND RESCUE AVIATION","department":"DfT","category":"Government Transformation and Service Delivery","description":"Following a procurement process which commenced in March 2021, the UKSAR2G contract was awarded in July 2022 to Bristow Helicopters Ltd. The UKSAR2G contract seeks to build upon the successes of its predecessors contracts to provide an aerial search and rescue (SAR) capability covering the UKs entire Search and Rescue Region of responsibility. This contract provides 18 helicopters, 6 fixed wing aircraft and an unmanned capability operating out of 10 permanent and 2 seasonal bases across the UK. Aerial SAR assets are tasked in response to 999 calls, or mayday requests to search for people who are missing or in distress, locate them and recover them from the danger they are in to a place of safety. The UKSAR2G service is the governments only civilian aerial response capability able to operate 365 days a year, 24 hours a day, at short notice. The service is estimated to rescue over 1,700 people every year; continuing to fulfil the UK’s obligations under international convention, and meeting the public expectation of delivering life-saving outcomes, saving lives more quickly and cost effectively than today.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from GREEN to AMBER. This is primarily due to the following factors‚ some early issues have arisen at the beginning of the transition phase but these provide key learning points as we move forward with the 26 month transition. As the SRO I do not currently believe that any of the issues currently seen are insurmountable or will effect the final project delivery.","startDate":"2019-12-16","endDate":"2026-12-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/12/2026. This is primarily due to the following factors‚ although there has been some movement within the schedule there are currently no factors that are likely to further effect the delivery schedule as programmed.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":1959.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 1959. This is primarily due to the following factors‚ The programme is currently early in the transition phase and only some small phased payments have been made. There is currently no indication that there will be an increase/decrease in budget requirement.","benefits":24475.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 24475. This is primarily due to the following factors‚ the programme is in the early stages of transition and full benefits analysis will not be available until after the transition (31 Dec 26)","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from GREEN to AMBER. This is primarily due to the following factors‚ some early issues have arisen at the beginning of the transition phase but these provide key learning points as we move forward with the 26 month…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"DFT_0048_2021-Q3","year":2026,"name":"2ND GENERATION UK SEARCH AND RESCUE AVIATION","department":"DFT","category":"Government Transformation and Service Delivery","description":"The UKSAR2G programme’s purpose is to procure a national UK aviation search and rescue (SAR) service that continues to save lives, protect UK economic interests and continue to comply with International Conventions beyond the end of the existing UKSAR Helicopter contract in 2024-26.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at green. This is primarily due to the programme remaining on track for all air stations to go live under SAR2G by Jan 2027, the project remains within financial approvals and it continues the service continues to undertake Search and Rescue when needed.","startDate":"2019-12-16","endDate":"2027-01-01","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same as last year's published end-date. This is primarily due to the continued forecast for the last air base to have transitioned to SAR2G by Jan 2027.","fyBaseline":196.42,"fyForecast":186.51,"fyVariance":5.04,"varianceNarrative":"The budget variance exceeds 5%. (5.04%) This is primarily due to one aircraft that was due to come online in Q4 not being realised until Period 1 of FY 26/27.","wholeLifeCost":2046.47,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) remained at £1,959.436. This is primarily due to the following factors. Even though there has been some increase in inflation figures some costs have been recovered through KPI relief on those parts of the contract that has transitioned. Although some variance in reported figures and held figures is noted this is due to the NISTA deflation of the figures.","benefits":25465.07,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at £24,474.990. Although some variance in reported figures and held figures is noted this is due to the NISTA deflation of the figures.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at green. This is primarily due to the programme remaining on track for all air stations to go live under SAR2G by Jan 2027, the project remains within financial approvals and it continues the service continues to undertake Search and Rescue when…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"DFT_0048_2021-Q3","year":2025,"name":"2ND GENERATION UK SEARCH AND RESCUE AVIATION","department":"DfT","category":"Government Transformation and Service Delivery","description":"Following a procurement process which commenced in March 2021, the UKSAR2G contract was awarded in July 2022 to Bristow Helicopters Ltd. The UKSAR2G contract seeks to build upon the successes of its predecessors contracts to provide an aerial search and rescue (SAR) capability covering the UKs entire Search and Rescue Region of responsibility. This contract provides 18 helicopters, 6 fixed wing aircraft and an unmanned capability operating out of 10 permanent and 2 seasonal bases across the UK. Aerial SAR assets are tasked in response to 999 calls, or mayday requests to search for people who are missing or in distress, locate them and recover them from the danger they are in to a place of safety. The UKSAR2G service is the governments only civilian aerial response capability able to operate 365 days a year, 24 hours a day, at short notice. The service is estimated to rescue over 1,700 people every year; continuing to fulfil the UK’s obligations under international convention, and meeting the public expectation of delivering life-saving outcomes, saving lives more quickly and cost effectively than today.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from GREEN to AMBER. This is primarily due to the following factors‚ some early issues have arisen at the beginning of the transition phase but these provide key learning points as we move forward with the 26 month transition. As the SRO I do not currently believe that any of the issues currently seen are insurmountable or will effect the final project delivery.","startDate":"2019-12-16","endDate":"2026-12-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/12/2026. This is primarily due to the following factors‚ although there has been some movement within the schedule there are currently no factors that are likely to further effect the delivery schedule as programmed.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":1959.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 1959. This is primarily due to the following factors‚ The programme is currently early in the transition phase and only some small phased payments have been made. There is currently no indication that there will be an increase/decrease in budget requirement.","benefits":24475.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 24475. This is primarily due to the following factors‚ the programme is in the early stages of transition and full benefits analysis will not be available until after the transition (31 Dec 26)","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from GREEN to AMBER. This is primarily due to the following factors‚ some early issues have arisen at the beginning of the transition phase but these provide key learning points as we move forward with the 26 month…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":-1,"transition":"Improved","endDateDeltaDays":1,"attentionScore":2,"attentionReasons":["Published end date moved 1 days later","In-year forecast variance is +5.0%"]},{"id":"DFT_0044_2021-Q2","year":2026,"name":"A417 AIR BALLOON","department":"DFT","category":"Infrastructure and Construction","description":"As announced in the Roads Investment Strategy 2, the scope includes improving the A417 with a scheme that includes: - 4 miles of new dual carriageway connecting the existing A417 Brockworth bypass with the existing A417 dual carriageway south of Cowley - a section to the west of the existing Air Balloon roundabout that will follow the existing A417 corridor. However, the section to the south and east of the Air Balloon roundabout will be offline, away from the existing road corridor - a new junction at Shab Hill, providing a link from the A417 to the A436 towards Oxford and into Birdlip - a new junction near Cowley, to replace the existing Cowley Roundabout - the existing A417 between the Air Balloon roundabout and the Cowley Roundabout is being repurposed. We are converting some lengths of this existing road into a route for walkers, cyclists and horse riders, while retaining other sections to maintain local access for residents.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at green. This is primarily due to the following factors that the project is progressing to schedule and on track for Open for Traffic in Quarter 4 Financial Year 26-27.","startDate":"2015-04-01","endDate":"2027-08-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 24/25-Q4 remained at 31/08/2027. This is primarily due to the following factors, that the project remains on schedule.","fyBaseline":137.54,"fyForecast":128.19,"fyVariance":6.8,"varianceNarrative":"The budget variance exceeds 5% of the baseline. This is primarily due to the following factors‚ using our recent forecast from the Business Plan (Dec 2024) the variance is under 5%, but the financial year forecast has been converted to real prices making it slightly exceed 5% variance with the financial year baseline. Please note the HMT baseline (2023) has been superseded by the Business Plan (Dec 2024) as this is the most recent forecast. We didn't draw down on any of the portfolio risk pot within the financial year. Our forecast outturn cost has not changed.","wholeLifeCost":542.63,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) increased from 535 to 542.63. This is primarily due to the following factors that our Whole Life forecast costs have been converted into a different price base (or nominal) if it wasn't for this the costs would have remained unchanged.","benefits":233.06,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) decreased from 424 to 233.06. This is primarily due to the following factors that the figure has been converted into a different price base (or nominal) if it wasn't for this the predicted benefits would have remained unchanged.","themes":["Cost & funding","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at green. This is primarily due to the following factors that the project is progressing to schedule and on track for Open for Traffic in Quarter 4 Financial Year 26-27. Compared to financial year 24/25-Q4, the project's end-date at 24/25-Q4…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"DFT_0044_2021-Q2","year":2021,"name":"A417 Air Balloon","department":"DFT","category":"Infrastructure and Construction","description":"As announced in the Road Investment Strategy 2 the scope includes: A417 Air Balloon - connecting the two dual carriageway sections of the A417 near Birdlip in Gloucestershire, taking account of both the environmental sensitivity of the site and the importance of the route to the local economy.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber/Green.This is primarily due to the following factors: An IPA Gateway 2 review took place during Q3 FY2020/21, and the delivery confidence rating given was an Amber/Green. The project has implemented all of the recommendations from the review to set the project up for success in order to support the amber/green rating. The project has increased stakeholder engagement and communications in the build up to submission of the Development Consent Order (DCO); has included additional environmental mitigation and enhancements (stepping stones and widening the ecological crossing); has reviewed resourcing and skills requirements and is currently recruiting additional project, commercial and sponsorship resources.","startDate":"2015-04-01","endDate":"2025-06-30","scheduleNarrative":"The project end-date is 30 June 2025. This is primarily due to the following factors: The Highways England Delivery Plan forecasted a project open for traffic date of FY2024/25. The decision was taken to extend the development phase so that a supplementary public consultation could be held to seek views on design changes and refinements to the proposed scheme and to undertake further survey work. The survey's supporting buildability advice highlighted that a more cautious approach for the rest of the schedule and open for traffic date forecast should be adopted. The project is on track to submit DCO in May 2021 and is appointing a Delivery Integrated Partner in mid-2021, to help develop the detailed design and maximise both benefits opportunities and delivery efficiencies during the construction of the scheme. This will bring greater cost and schedule certainty to the project. During this design period the project will be looking for additional opportunities to reduce the construction schedule and to improve the latest open for traffic date forecast of Q2 FY2026/27. The change to the forecast schedule dates has been noted by DfT and HM Treasury.","fyBaseline":17.41,"fyForecast":17.82,"fyVariance":2.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"","themes":["Delivery & schedule","Commercial & supply chain","Scope & requirements","Approvals & decisions"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber/Green.This is primarily due to the following factors: An IPA Gateway 2 review took place during Q3 FY2020/21, and the delivery confidence rating given was an Amber/Green. The project has implemented all of the recommendations from the review to set the project up for…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21"},{"id":"DFT_0044_2021-Q2","year":2022,"name":"A417 Air Balloon","department":"DFT","category":"Infrastructure and Construction","description":"As announced in the Roads Investment Strategy 2, the scope includes: A417 Air Balloon - connecting the two dual carriageway sections of the A417 near Birdlip in Gloucestershire, taking account of both the environmental sensitivity of the site and the importance of the route to the local economy.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 20/21-Q4, the Delivery Confidence Assessment rating at 21/22-Q4 increased from Amber/Green to Amber. In the last year the project has progressed to submission of the Development Consent Order (DCO) application which is due to conclude by November 2022. If approved this will grant the necessary powers to construct the project. Additionally, an agreement has been reached with the lead supplier which is proceeding through governance approvals. Some key project risks and issues include: (1) The project is developing in a period of economic uncertainty which has seen increased levels of inflation. (2) The Secretary of state has extended the consideration of DCO applications on several highways scheme which has increased uncertainty. The project is looking to carry out an IPA Gate 3 in Q3 FY 2022/23. The review will be in preparation for the projects readiness to commence the construction phase of the project. All actions from the previous IPA 2 Gateway have now been closed.","startDate":"2015-04-01","endDate":"2027-04-30","scheduleNarrative":"Compared to 2021-Q4, your project end-date increased from 30 JUN 2025 to 30 APR 2027. This is primarily due to the following factors: As the design of the scheme has developed, further planning around how the construction works will be undertaken has been reviewed and sequenced into the overall schedule. Due to seasonaility constraints to do with ecology, the project is now forecasting an extended time to complete the works on site.","fyBaseline":17.94,"fyForecast":15.74,"fyVariance":-11.0,"varianceNarrative":"There has been a 12% reduction of in year spend due to a delay in onboarding a contractor. This has now been reprofiled to be spent in FY 22/23.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"","themes":["Commercial & supply chain","Delivery & schedule","Cost & funding","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Delivery Confidence Assessment rating at 21/22-Q4 increased from Amber/Green to Amber. In the last year the project has progressed to submission of the Development Consent Order (DCO) application which is due to conclude by November 2022. If approved this will grant the necessary powers to construct the project.…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"DFT_0044_2021-Q2","year":2023,"name":"A417 Air Balloon","department":"DFT","category":"Infrastructure and Construction","description":"As announced in the Roads Investment Strategy 2, the scope includes: A417 Air Balloon - connecting the two dual carriageway sections of the A417 near Birdlip in Gloucestershire, taking account of both the environmental sensitivity of the site and the importance of the route to the local economy.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 21/22-Q4, Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 increased from Amber to Green. This is primarily due to the following factors. An Independent Assurance Review (IAR) 3B was undertaken in October 2022 with a Green outcome. Project received 5 recommendations of which 2 were recommendations and 3 were essential. An action plan was put in place and all recommendations have been completed","startDate":"2015-04-01","endDate":"2027-08-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 increased from 2027-04-30 to 2027-08-31. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 increased from 2027-04-30 to 2027-08-31. This is primarily due to the following factors. Start of Works (SoW) was achieved on 17 February 2023, one month ahead of the DfT approved forecasted date, and seven months ahead of National Highways Delivery Plan commitment date. Project is still on target to achieve commitment dates","fyBaseline":33.4,"fyForecast":30.5,"fyVariance":-9.0,"varianceNarrative":"The baseline for 22/23 was set in the 21/22 FY, prior to appointment of the Delivery Integrated Partner at a point where the preliminary design was still being improved. As the project mobilised the Regional Delivery Partnership contract, we acquired more certainty over work packages through the year. National Highways also changed the supplier for its project controls function (the contract) and the contractual rates differed from the assumptions made when the baseline was set.","wholeLifeCost":482.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 22/23-Q4 is 482m. This is primarily due to the following factors. The project is forecasting within the approved budget","benefits":424.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 424m. The benefits have been reprofiled in line with the latest economic appraisal (Business Case). The benefits have dropped by 92m (Present Value Benefits) since updated Outline Business Case (Approved in 2021) due to changes in transport appraisal guidance and methodology updates. There has been no material change to the project scope.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 increased from Amber to Green. This is primarily due to the following factors. An Independent Assurance Review (IAR) 3B was undertaken in October 2022 with a Green outcome. Project received 5 recommendations of which 2 were recommendations and 3…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"DFT_0044_2021-Q2","year":2024,"name":"A417 Air Balloon","department":"DFT","category":"Infrastructure and Construction","description":"As announced in the Roads Investment Strategy 2, the scope includes: A417 Air Balloon- connecting the two dual carriageway sections of the A417 near Birdlip in Gloucestershire, taking account of both the environmental sensitivity of the site and the importance of the route to local economy.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Green. This is primarily due to the following factors. An Independent Assurance Review (IAR) 3B was undertaken in October 2022 with a Green Outcome. Project received 5 recommendations of which 2 were recommendations and 3 were essential. An action plan was put in place and all recommendations have been completed.","startDate":"2015-04-01","endDate":"2027-08-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2027-08-31. This is primarily due to the following factors. Start of Works (SoW) was achieved on 17 February 2023, one month ahead of the Department for Transport approved forecast date, and seven months ahead of National Highways Delivery Plan committed date. Project is still on target to achieve commitment dates. The Notice to proceed was issued to National Highways delivery partner on 28 December 2023, to commence the next phase of the construction works.","fyBaseline":80.6,"fyForecast":47.07,"fyVariance":-42.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The project has re-phased the construction programme, there is no change to the outturn cost.","wholeLifeCost":535.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 increased from 482m. to 535m. This is primarily due to the following factors. The increase is due to cost inflation being higher than anticipated when the previous estimate was set.","benefits":424.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 424m. There has been no change.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Green. This is primarily due to the following factors. An Independent Assurance Review (IAR) 3B was undertaken in October 2022 with a Green Outcome. Project received 5 recommendations of which 2 were recommendations and 3 were…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"DFT_0044_2021-Q2","year":2025,"name":"A417 AIR BALLOON","department":"DfT","category":"Infrastructure and Construction","description":"As announced in the Roads Investment Strategy 2, the scope includes improving the A417 with a scheme that includes: - 4 miles of new dual carriageway connecting the existing A417 Brockworth bypass with the existing A417 dual carriageway south of Cowley - a section to the west of the existing Air Balloon roundabout that will follow the existing A417 corridor. However, the section to the south and east of the Air Balloon roundabout will be offline, away from the existing road corridor - a new junction at Shab Hill, providing a link from the A417 to the A436 towards Oxford and into Birdlip - a new junction near Cowley, to replace the existing Cowley Roundabout - the existing A417 between the Air Balloon roundabout and the Cowley Roundabout is being repurposed. We are converting some lengths of this existing road into a route for walkers, cyclists and horse riders, while retaining other sections to maintain local access for residents.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at GREEN. This is primarily due to the following factors‚ The project is still forecasting to deliver on budget and OfT remains as Spring 2027.","startDate":"2015-04-01","endDate":"2027-08-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/08/2027. This is primarily due to the following factors‚ The project remains on schedule.","fyBaseline":161.6,"fyForecast":128.31,"fyVariance":20.6,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The In-year Spend vs Forecast variance within the annual report exceeds 5% as the forecast used is the HMT baseline (2023) not the updated baseline following the fitness for pricing exercise March 2024, for which the variance is within 5%. We didn't draw down on any of the portfolio risk pot within the financial year. Our forecast outturn cost has not changed.","wholeLifeCost":535.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 535. This is primarily due to the following factors‚ Our forecast costs have remained unchanged.","benefits":424.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 424. This is primarily due to the following factors‚ Our predicted benefits have not changed.","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at GREEN. This is primarily due to the following factors‚ The project is still forecasting to deliver on budget and OfT remains as Spring 2027. Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"DFT_0044_2021-Q2","year":2026,"name":"A417 AIR BALLOON","department":"DFT","category":"Infrastructure and Construction","description":"As announced in the Roads Investment Strategy 2, the scope includes improving the A417 with a scheme that includes: - 4 miles of new dual carriageway connecting the existing A417 Brockworth bypass with the existing A417 dual carriageway south of Cowley - a section to the west of the existing Air Balloon roundabout that will follow the existing A417 corridor. However, the section to the south and east of the Air Balloon roundabout will be offline, away from the existing road corridor - a new junction at Shab Hill, providing a link from the A417 to the A436 towards Oxford and into Birdlip - a new junction near Cowley, to replace the existing Cowley Roundabout - the existing A417 between the Air Balloon roundabout and the Cowley Roundabout is being repurposed. We are converting some lengths of this existing road into a route for walkers, cyclists and horse riders, while retaining other sections to maintain local access for residents.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at green. This is primarily due to the following factors that the project is progressing to schedule and on track for Open for Traffic in Quarter 4 Financial Year 26-27.","startDate":"2015-04-01","endDate":"2027-08-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 24/25-Q4 remained at 31/08/2027. This is primarily due to the following factors, that the project remains on schedule.","fyBaseline":137.54,"fyForecast":128.19,"fyVariance":6.8,"varianceNarrative":"The budget variance exceeds 5% of the baseline. This is primarily due to the following factors‚ using our recent forecast from the Business Plan (Dec 2024) the variance is under 5%, but the financial year forecast has been converted to real prices making it slightly exceed 5% variance with the financial year baseline. Please note the HMT baseline (2023) has been superseded by the Business Plan (Dec 2024) as this is the most recent forecast. We didn't draw down on any of the portfolio risk pot within the financial year. Our forecast outturn cost has not changed.","wholeLifeCost":542.63,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) increased from 535 to 542.63. This is primarily due to the following factors that our Whole Life forecast costs have been converted into a different price base (or nominal) if it wasn't for this the costs would have remained unchanged.","benefits":233.06,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) decreased from 424 to 233.06. This is primarily due to the following factors that the figure has been converted into a different price base (or nominal) if it wasn't for this the predicted benefits would have remained unchanged.","themes":["Cost & funding","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at green. This is primarily due to the following factors that the project is progressing to schedule and on track for Open for Traffic in Quarter 4 Financial Year 26-27. Compared to financial year 24/25-Q4, the project's end-date at 24/25-Q4…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"DFT_0044_2021-Q2","year":2025,"name":"A417 AIR BALLOON","department":"DfT","category":"Infrastructure and Construction","description":"As announced in the Roads Investment Strategy 2, the scope includes improving the A417 with a scheme that includes: - 4 miles of new dual carriageway connecting the existing A417 Brockworth bypass with the existing A417 dual carriageway south of Cowley - a section to the west of the existing Air Balloon roundabout that will follow the existing A417 corridor. However, the section to the south and east of the Air Balloon roundabout will be offline, away from the existing road corridor - a new junction at Shab Hill, providing a link from the A417 to the A436 towards Oxford and into Birdlip - a new junction near Cowley, to replace the existing Cowley Roundabout - the existing A417 between the Air Balloon roundabout and the Cowley Roundabout is being repurposed. We are converting some lengths of this existing road into a route for walkers, cyclists and horse riders, while retaining other sections to maintain local access for residents.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at GREEN. This is primarily due to the following factors‚ The project is still forecasting to deliver on budget and OfT remains as Spring 2027.","startDate":"2015-04-01","endDate":"2027-08-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/08/2027. This is primarily due to the following factors‚ The project remains on schedule.","fyBaseline":161.6,"fyForecast":128.31,"fyVariance":20.6,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The In-year Spend vs Forecast variance within the annual report exceeds 5% as the forecast used is the HMT baseline (2023) not the updated baseline following the fitness for pricing exercise March 2024, for which the variance is within 5%. We didn't draw down on any of the portfolio risk pot within the financial year. Our forecast outturn cost has not changed.","wholeLifeCost":535.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 535. This is primarily due to the following factors‚ Our forecast costs have remained unchanged.","benefits":424.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 424. This is primarily due to the following factors‚ Our predicted benefits have not changed.","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at GREEN. This is primarily due to the following factors‚ The project is still forecasting to deliver on budget and OfT remains as Spring 2027. Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":0,"attentionScore":2,"attentionReasons":["In-year forecast variance is +6.8%"]},{"id":"HMRC_0015_1617-Q1","year":2026,"name":"BUILDING OUR FUTURE LOCATIONS PROGRAMME","department":"HMRC","category":"Government Transformation and Service Delivery","description":"HMRC’s locations strategy, announced in 2015, is key to enabling a modern tax and customs administration. The programme transforms HMRC’s estate to enable the organisation to operate from strategically important locations that support both government’s priorities and HMRC’s delivery. Our people will work in large, modern regional centres, regional offices and a London Headquarters from which we can better deliver our services. Our long-term offices are being sited in locations where HMRC can recruit, retain and develop a talented workforce, equipped with the digital infrastructure and flexible workspace needed to support and motivate our people.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The programme’s Delivery Confidence Assessment improved from Amber to Green following a National Infrastructure and Service Transformation Authority (NISTA) review in July 2025. This reflects strong confidence in the programme’s governance, capability and delivery approach. In April 2026, the programme moved from NISTA GMPP reporting to Major Project status, with assurance now led by HMRC. The programme continues to secure and deliver long‑term locations that retain critical skills, minimise redundancies and rehire costs, and provide best value for money—supporting HMRC’s long‑term workforce sustainability and operational effectiveness.","startDate":"2016-01-05","endDate":"2031-04-05","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same - 05/04/2031. Whilst the current assumption remains that the Locations Programme will close in 2030/31, the programme continues to undertake rigorous planning to ensure a smooth, well‑coordinated programme closure that protects delivery confidence and organisational readiness.","fyBaseline":201.79,"fyForecast":212.5,"fyVariance":5.31,"varianceNarrative":"The 2025/26 full year final position is £10m higher than the departmental forecast reported at Q3 driven by recognising opportunities to accelerate areas of the programme which de-risks delivery timelines.","wholeLifeCost":2831.53,"costNarrative":"The programme was originally planned to complete within 10 years but is now expected to run for 15 years. In 2018/19, the business case was updated and the Whole Life Costs (WLC) were extended to a 25-year period, in line with industry standards. This approach has been used consistently in all subsequent business cases. As a result of the longer programme duration, the discounted HM Treasury WLC increased, but it remains within the overall WLC envelope set out in the original programme.","benefits":143.88,"benefitsNarrative":"The programme's Benefits at 25/26-Q4 remain in line with the departmental baseline. Monetised benefits represent estate running cost savings as a result of exiting legacy estate and moving into new offices.","themes":["Delivery & schedule","Governance & assurance","Workforce & capability","Cost & funding"],"evidenceExcerpt":"The programme’s Delivery Confidence Assessment improved from Amber to Green following a National Infrastructure and Service Transformation Authority (NISTA) review in July 2025. This reflects strong confidence in the programme’s governance, capability and delivery approach. In April 2026, the programme moved from NISTA GMPP reporting to Major Project…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"HMRC_0015_1617-Q1","year":2020,"name":"Building Our Future Locations Programme","department":"HMRC","category":"Government Transformation and Service Delivery","description":"HMRC will be a transformed organisation operating from 13 large, modern Regional Centres (RCs), 5 Specialist Sites and a London Headquarters equipped with the digital infrastructure and training facilities needed to support and motivate our people, and from which we can better serve our customers as an effective, efficient and impartial tax and payments authority.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber/Green, which has improved since last year�s Q2 1819 Amber, due primarily to the following factors; - The signing of Regional Centre leases for all locations except Newcastle, and the commercial agreement of all fit-out and FM contracts, provided a firm baseline for the Programme with practical evidence of successful delivery in Bristol, Croydon & Canary Wharf shaping future transitions by demonstrating that learning had been taken on-board from these deliveries, the transition of staff and early legacy site closures. - The 'Bounding' or confining of the financial risk, establishing a firm view on delivery cost and a more realistic assessment of the cashable benefits, managing well within budgets set out in the latest version of the business case with a good balance between financial risks and opportunities. This is strengthened further by the signing of the STEPS PFI exit deal in March 2020. - A high quality of Programme Leadership and team, with a key focus on staff and supporting them through the transition. Very strong evidence of staff engagement and the requirement to balance both the needs of staff and the business. Robust risk management in place. Since the Q2 1920 (30th September 2019) Amber/Green IPA DCA, the following non-project operating environment activities have impacted the original Q2 IPA DCA; - Increases in predicted HMRC staffing levels, mainly through EU Transition work. - Covid-19 is having an increasingly major effect on the programme.� A 'Planning for Delay' process is being used to assess individual project delivery risk; A Programme Response Plan has been produced to support national priorities; Programme is working with contractors to assess their delivery capacity and constraints against a fast developing situation. The places most affected are Birmingham, Liverpool and Stratford whose delivery schedules were the tightest beforehand. Since the Q2 1920 (30th September 2019) Amber/Green IPA DCA, the following primary project actions have impacted the original Q2 IPA DCA; - Further to the opening of the Bristol RC, Belfast, Erskine House was opened in January 2020, with our new acquisition transitional site in Glasgow following in March 2020, and the Edinburgh RC being well set for delivery in early 2020/21. - Difficulties with the Liverpool RC delivery reaching resolution, with contracts now moving to signing between landlord and new contractor to progress India Buildings to a refreshed schedule; resulting in movement of costs and some legacy estate challenges. The Birmingham project is delayed due to a CAT A (ceiling, lighting, heating, flooring etc.) build overrun. Options to mitigate are in progress to minimise disruption to people and business. Current contractor has increased resources for internal and external works to minimise the �Ready For Service� delay. - Work is underway to consolidate estate changes made necessary since our programme baseline was agreed by way of a re-iteration to the programme business case.","startDate":"2016-01-05","endDate":"2026-03-31","scheduleNarrative":"The scheduled baseline project end date at Q2 1920 (30th September 2019) is 31/03/26, has not changed since last year's Q2 1819 date of 31/03/26, due primarily to the following factors; - The date is in relation to the Locations Programme closure which has and continues to remain consistent at 31/03/2026. Since the Q2 1920 (30th September 2019) baseline project end date of 31/03/26, the following non-project operating environment activities have impacted the original Q2 baseline project end date; - The baseline programme closure end date remains at 31/03/2026. The impacts of Covid 19 at project level are currently being reviewed via a contingency planning exercise but, at this stage, are not expected to put the programme closure date at risk. Since the Q2 1920 (30th September 2019) baseline project end date of 31/03/26, the following primary project actions have impacted the original Q2 baseline project end date; - The current impacts on Locations Programme individual projects are not known to effect the programme end date of 31/03/2026.","fyBaseline":387.7,"fyForecast":348.3,"fyVariance":-10.0,"varianceNarrative":"The 19/20 in-year baseline / forecast variance at Q2 1920 (30th September 2019) of -10%, is due primarily to the following factors; - HMRC reprioritisation exercises, post the calculation of the programme baseline, result in decisions to delay the Newcastle and Nottingham Regional Centre Projects to later years","wholeLifeCost":2835.9,"costNarrative":"The baseline Whole Life Cost at Q2 1920 (30th September 2019) is �2,835.90 m, has not changed since last year's Q2 1819 (�m) baseline Whole Life Cost of �2,835.90 m, due primarily to the following factors; - The programme baseline has not been formally updated since the Programme business Case v1, approved by HMT in April 2017.","benefits":null,"benefitsNarrative":"","themes":["Delivery & schedule","Cost & funding","Workforce & capability","Approvals & decisions"],"evidenceExcerpt":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber/Green, which has improved since last year�s Q2 1819 Amber, due primarily to the following factors; - The signing of Regional Centre leases for all locations except Newcastle, and the commercial agreement of all fit-out and FM contracts, provided a firm baseline…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2020","sourceLabel":"IPA Annual Report 2019-20"},{"id":"HMRC_0015_1617-Q1","year":2021,"name":"Building Our Future Locations Programme","department":"HMRC","category":"Government Transformation and Service Delivery","description":"HMRC's transformation is the biggest modernisation of the UK tax system making changes to the way the department works and the services it provides. Our Locations Programme is a key enabler and by changing people's working environment, HMRC is helping to change how they work. We are creating a new network of modern digital hubs in 13 regions, alongside 5 Specialist Sites and a London HQ. Our Regional Centres will be inclusive and environmentally friendly places to work. Technologically advanced, they will be available not just to HMRC colleagues but also to other government departments, truly anchoring the locations as the first in the network of wider government hubs and bringing to life the vision for the Civil Service of the future.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating increased from Amber/Green to Amber. This is primarily due to the following factors: In addition to the Edinburgh Regional Centre opened earlier this year, the Programme has successfully delivered a further 3 new Regional Centres during this quarter in Cardiff, Leeds and Stratford. We have now delivered 7 of the 13 HMRC Regional Centres, as well as a Hub at Canary Wharf. The Programme is on track to deliver a further 5 Regional Centres in the upcoming financial year. We continue to secure benefits, in accordance with the latest Programme Business Case, through the closure of our legacy estate. Over the last financial year, we have closed 40 legacy offices and a total of 124 offices since the Programme began.","startDate":"2016-01-05","endDate":"2026-03-31","scheduleNarrative":"Compared to financial year 19/20-Q2, the project's end-date remained scheduled to finish on 31 March 2026 . This is primarily due to the following factors: The Programme remains on target to complete on 31st March 2026","fyBaseline":405.8,"fyForecast":456.47,"fyVariance":12.0,"varianceNarrative":"The budget variance exceeds 5%. The 2020/21 full year final position at Q4 is 12% higher than baseline, this is primarily because of the following factors: - HMRC re-prioritisation of its programme portfolio resulting in deferral of expenditure into 2021/2022 - Civil Service Compensation Scheme terms not changing as originally expected resulting in exits remaining more expensive","wholeLifeCost":2835.9,"costNarrative":"Compared to financial year 19/20-Q2, the projects Baseline Whole Life Cost remained at �2835.90m. This is primarily due to the following factors: The baseline Whole Life Cost as at Q4 202/21 is unchanged from �2,835.90m reported in the 2019/20 report. It has not been formally updated since the Programme Business Case v1.0 was approved by HMT in May 2017.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Approvals & decisions","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating increased from Amber/Green to Amber. This is primarily due to the following factors: In addition to the Edinburgh Regional Centre opened earlier this year, the Programme has successfully delivered a further 3 new Regional Centres during this…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21"},{"id":"HMRC_0015_1617-Q1","year":2022,"name":"Building Our Future Locations Programme","department":"HMRC","category":"Government Transformation and Service Delivery","description":"HMRC's Locations Strategy, announced in 2015, is key to enabling its wider transformation. The Locations Strategy is delivering the Phase One Government Hubs and supports the Government's Places for Growth Programme by creating opportunities and career paths in towns and cities across the UK. Going forward HMRC will be operating from a network of large modern regional centres and specialist sites and a Head Office in Westminster. Our new buildings are environmentally efficient and provide flexible, fully inclusive workspaces supporting smarter working and meeting future changing demands and priorities of use.","ipaDca":"Green","sroDca":null,"deliveryConfidence":"Green","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 decreased from Amber to Green The Programme has successfully delivered 9 Regional Centres, alongside a hub at Canary Wharf. During Financial Year 2021/22, Regional Centres were delivered in Liverpool and Birmingham, and the Programme is on track to deliver a further 3 during Q1 of 2022/23. Following approval from the Chief Secretary to the Treasury (CST), the Programme announced that Portsmouth will become our 14th Regional Centre and East Kilbride will be the location for the second phase of Glasgow Regional Centre. The agreement for lease for the Newcastle Regional Centre was signed in November 2021.","startDate":"2016-01-05","endDate":"2026-03-31","scheduleNarrative":"Compared to 2021-Q4, your project end-date remained scheduled to finish on 31 MAR 2026 . This is primarily due to the following factors: The Programme remains on target to complete on 31st March 2026","fyBaseline":231.7,"fyForecast":270.05,"fyVariance":16.0,"varianceNarrative":"The budget variance exceeds 5%. The 2021/22 full year final position at Q4 is 16% higher than baseline, this is primarily because of the following factors: HMRC re-prioritisation of its programme Portfolio resulting in deferral of expenditure for several projects into 2021/2022 Civil Service Compensation Scheme terms not changing as originally expected resulting in exits remaining more expensive","wholeLifeCost":2836.0,"costNarrative":"Compared to 2021-Q4,the projects Baseline Whole Life Cost remained at 2835.90 (£m). This is primarily due to the following factors: The baseline Whole Life Cost as at Q4 2021/22 is unchanged from £2,835.90m reported in the 2020/21 report. It has not been formally updated since the Programme Business Case v1.0 was approved by HMT in April 2017.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Approvals & decisions","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 decreased from Amber to Green The Programme has successfully delivered 9 Regional Centres, alongside a hub at Canary Wharf. During Financial Year 2021/22, Regional Centres were delivered in Liverpool and Birmingham, and the Programme…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"HMRC_0015_1617-Q1","year":2023,"name":"Building Our Future Locations Programme","department":"HMRC","category":"Government Transformation and Service Delivery","description":"HMRC's Locations Strategy, announced in 2015, is key to enabling its wider transformation. The Locations Strategy is delivering the Phase One Government Hubs and supports the Governments Places for Growth Programme by creating opportunities and career paths in towns and cities across the UK. HMRC's new estate provides safe, modern and inclusive workspaces with high-speed digital infrastructure enabling improved collaboration, smarter working and enabling a culture where everyone feels valued. These incorporate flexible layouts that will meet future changing demands and priorities.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 remained at Green (SRO rating). This is primarily due to the following factors. The Programme has now successfully delivered 12 regional centres and 2 Specialist Sites, with 11 of these being awarded Inclusive Environments Recognition by the Construction Industry Council (CIC). During Financial Year 2022/23, the Locations Programme successfully opened a further 3 regional centres in Nottingham, Glasgow and Manchester, enabling over 10k HMRC staff to move into those new offices within the planned timescales. Following the lifting of lock down restrictions, we were also finally able to hold the opening ceremonies for 10 of our new regional centres. Ourremaining projects are at a stage where we are still considering options and Outline Business Cases will be produced from Q1 23/24 onwards.","startDate":"2016-01-05","endDate":"2026-03-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2026-03-31. This is primarily due to the following factors. The current assumption is that the programme end date will be 2028/29, to allow the safe delivery of our remaining deliveries and to the conclude our work on Phase 1 of the Government Hubs.","fyBaseline":221.2,"fyForecast":232.79,"fyVariance":5.0,"varianceNarrative":"The budget variance exceeds 5%. 2022/23 full year final position at end of Q4 is 32% lower than baseline. This is primarily due to the baseline position included 9.6m for Moves Assistance Payments (MAP, formerly Daily Travel Allowance) which the programme no longer funds, and revised delivery timelines in several projects, and a move to Hybrid working which greatly reduces the cost to HMRC.","wholeLifeCost":2836.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 remained at 2836m. This is primarily due to the following factors. The baseline Whole Life Cost as at Q4 2022/23 is unchanged from 2,836m reported in the 2021/22 report. It has not been formally updated since the Programme Business Case v1.0 was approved by HMT in April 2017.","benefits":74.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 74m. The project's departmentally-agreed monetised benefits at 22/23-Q4 is 74m. This is due to: Monetised benefits represent estate running cost savings as a result of exiting legacy estate and moving into new Regional Centres and Specialist sites.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 remained at Green (SRO rating). This is primarily due to the following factors. The Programme has now successfully delivered 12 regional centres and 2 Specialist Sites, with 11 of these being awarded Inclusive Environments Recognition by the Construction Industry…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"HMRC_0015_1617-Q1","year":2024,"name":"Building Our Future Locations Programme","department":"HMRC","category":"Government Transformation and Service Delivery","description":"HMRC's locations strategy, announced in 2015, is key to enabling a more highly skilled tax and customs authority within a Modern Civil Service. It continues to deliver modern, inclusive and strategically located offices, supporting the Government's Places for Growth Programme by creating opportunities, career paths and enabling vibrant cross government professional communities and in towns and cities across the UK._x000D_ _x000D_ HMRC's new, award winning, offices provide safe, modern and inclusive workspaces with the digital infrastructure enabling improved collaboration, smarter working and a culture where everyone feels valued. HMRC's offices incorporate flexible layouts that will meet future changing demands and priorities.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 22/23-Q4, Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 increased from Green to Amber. This is primarily due to the following factors. The programme successfully completed the first phase of its delivery of Phase One of Government Hubs. It has opened 12 award winning, greener offices enabling smarter working and accommodating 48 government departments. We are continuing to secure long term locations to ensure HMRC retains the required skills, in the right locations while minimising redundancies, loss of knowledge and cost of rehire._x000D_ _x000D_ In 2023/24, we obtained approval and progressed our solutions for Portsmouth, Telford and Dover. Ourremaining projects are at astage where we are still considering options andOutline Business Cases will be produced during the next financial year.","startDate":"2016-01-05","endDate":"2031-04-05","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 increased from 2026-03-31 to 2031-04-05. This is primarily due to the following factors. We are continuing to secure long term locations for HMRC. Taking this into consideration, the current assumption is that the Programme will close in 2030/31.","fyBaseline":225.2,"fyForecast":232.95,"fyVariance":3.0,"varianceNarrative":"The budget variance is inferior or equal to 5%.","wholeLifeCost":2836.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 remained at 2836m. This is primarily due to the following factors. Whilst there have been in-year costs variances, the overall cost of the programme remains unchanged.","benefits":74.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 74m. Monetised benefits represent estate running cost savings as a result of exiting legacy estate and moving into new Regional Centres and Specialist sites.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 increased from Green to Amber. This is primarily due to the following factors. The programme successfully completed the first phase of its delivery of Phase One of Government Hubs. It has opened 12 award winning, greener offices enabling smarter…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"HMRC_0015_1617-Q1","year":2025,"name":"BUILDING OUR FUTURE LOCATIONS PROGRAMME","department":"HMRC","category":"Government Transformation and Service Delivery","description":"HMRC’s locations strategy, announced in 2015, is key to enabling a more highly skilled tax and customs authority within a Modern Civil Service. It continues to deliver modern, inclusive and strategically located offices, supporting wider government by creating opportunities, career paths and enabling vibrant cross government professional communities and in towns and cities across the UK. HMRC’s new, award winning, offices provide safe, modern and inclusive workspaces with the digital infrastructure enabling improved collaboration, smarter working and a culture where everyone feels valued. HMRC’s offices incorporate flexible layouts that will meet future changing demands and priorities.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The programme has successfully delivered 12 award winning, greener offices enabling smarter working and accommodating over 40 government departments. We are continuing to secure long term locations to ensure HMRC retains the required skills, in the right locations while minimising redundancies, loss of knowledge and cost of rehire. In 2024/25, we successfully completed the refurbishment of our Dover Specialist Site. The construction of the Newcastle Regional Centre is progressing as planned and we are entering the delivery phase for our Portsmouth and Telford offices. For our remaining sites, we have scheduled the delivery of the Outline Business Cases to enable us identify solutions that offer the best value for money and ensure HMRC retains the required skills in the right locations.","startDate":"2016-01-05","endDate":"2031-04-05","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 05/04/2031. This is primarily due to the following factors‚ We are continuing to secure long term locations for HMRC. Taking this into consideration, the current assumption remains that the Programme will close in 2030/31.","fyBaseline":201.64,"fyForecast":196.48,"fyVariance":2.56,"varianceNarrative":"The budget variance is less than or equal to 5%. The 2024/25 full year final position was c.£2m lower than the departmental forecast reported at Q3. This is primarily due to in-year reductions driven by revised delivery timelines in several projects where costs will be incurred at a future point.","wholeLifeCost":2884.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 2836 to 2884. This is primarily due to the following factors‚ Programme delivery was expected to conclude within a 10 year timeframe whereas the current programme is for 15 years. Given the extended life of the programme, discounted HMT WLC cost have increased but are still within the original programme WLC.","benefits":107.3,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 74 to 107. This is primarily due to the following factors‚ Monetised benefits represent estate running cost savings as a result of exiting legacy estate and moving into new Regional Centres and Specialist sites.","themes":["Cost & funding","Delivery & schedule","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The programme has successfully delivered 12 award winning, greener offices enabling smarter working and accommodating over 40 government departments. We are…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"HMRC_0015_1617-Q1","year":2026,"name":"BUILDING OUR FUTURE LOCATIONS PROGRAMME","department":"HMRC","category":"Government Transformation and Service Delivery","description":"HMRC’s locations strategy, announced in 2015, is key to enabling a modern tax and customs administration. The programme transforms HMRC’s estate to enable the organisation to operate from strategically important locations that support both government’s priorities and HMRC’s delivery. Our people will work in large, modern regional centres, regional offices and a London Headquarters from which we can better deliver our services. Our long-term offices are being sited in locations where HMRC can recruit, retain and develop a talented workforce, equipped with the digital infrastructure and flexible workspace needed to support and motivate our people.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The programme’s Delivery Confidence Assessment improved from Amber to Green following a National Infrastructure and Service Transformation Authority (NISTA) review in July 2025. This reflects strong confidence in the programme’s governance, capability and delivery approach. In April 2026, the programme moved from NISTA GMPP reporting to Major Project status, with assurance now led by HMRC. The programme continues to secure and deliver long‑term locations that retain critical skills, minimise redundancies and rehire costs, and provide best value for money—supporting HMRC’s long‑term workforce sustainability and operational effectiveness.","startDate":"2016-01-05","endDate":"2031-04-05","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same - 05/04/2031. Whilst the current assumption remains that the Locations Programme will close in 2030/31, the programme continues to undertake rigorous planning to ensure a smooth, well‑coordinated programme closure that protects delivery confidence and organisational readiness.","fyBaseline":201.79,"fyForecast":212.5,"fyVariance":5.31,"varianceNarrative":"The 2025/26 full year final position is £10m higher than the departmental forecast reported at Q3 driven by recognising opportunities to accelerate areas of the programme which de-risks delivery timelines.","wholeLifeCost":2831.53,"costNarrative":"The programme was originally planned to complete within 10 years but is now expected to run for 15 years. In 2018/19, the business case was updated and the Whole Life Costs (WLC) were extended to a 25-year period, in line with industry standards. This approach has been used consistently in all subsequent business cases. As a result of the longer programme duration, the discounted HM Treasury WLC increased, but it remains within the overall WLC envelope set out in the original programme.","benefits":143.88,"benefitsNarrative":"The programme's Benefits at 25/26-Q4 remain in line with the departmental baseline. Monetised benefits represent estate running cost savings as a result of exiting legacy estate and moving into new offices.","themes":["Delivery & schedule","Governance & assurance","Workforce & capability","Cost & funding"],"evidenceExcerpt":"The programme’s Delivery Confidence Assessment improved from Amber to Green following a National Infrastructure and Service Transformation Authority (NISTA) review in July 2025. This reflects strong confidence in the programme’s governance, capability and delivery approach. In April 2026, the programme moved from NISTA GMPP reporting to Major Project…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"HMRC_0015_1617-Q1","year":2025,"name":"BUILDING OUR FUTURE LOCATIONS PROGRAMME","department":"HMRC","category":"Government Transformation and Service Delivery","description":"HMRC’s locations strategy, announced in 2015, is key to enabling a more highly skilled tax and customs authority within a Modern Civil Service. It continues to deliver modern, inclusive and strategically located offices, supporting wider government by creating opportunities, career paths and enabling vibrant cross government professional communities and in towns and cities across the UK. HMRC’s new, award winning, offices provide safe, modern and inclusive workspaces with the digital infrastructure enabling improved collaboration, smarter working and a culture where everyone feels valued. HMRC’s offices incorporate flexible layouts that will meet future changing demands and priorities.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The programme has successfully delivered 12 award winning, greener offices enabling smarter working and accommodating over 40 government departments. We are continuing to secure long term locations to ensure HMRC retains the required skills, in the right locations while minimising redundancies, loss of knowledge and cost of rehire. In 2024/25, we successfully completed the refurbishment of our Dover Specialist Site. The construction of the Newcastle Regional Centre is progressing as planned and we are entering the delivery phase for our Portsmouth and Telford offices. For our remaining sites, we have scheduled the delivery of the Outline Business Cases to enable us identify solutions that offer the best value for money and ensure HMRC retains the required skills in the right locations.","startDate":"2016-01-05","endDate":"2031-04-05","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 05/04/2031. This is primarily due to the following factors‚ We are continuing to secure long term locations for HMRC. Taking this into consideration, the current assumption remains that the Programme will close in 2030/31.","fyBaseline":201.64,"fyForecast":196.48,"fyVariance":2.56,"varianceNarrative":"The budget variance is less than or equal to 5%. The 2024/25 full year final position was c.£2m lower than the departmental forecast reported at Q3. This is primarily due to in-year reductions driven by revised delivery timelines in several projects where costs will be incurred at a future point.","wholeLifeCost":2884.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 2836 to 2884. This is primarily due to the following factors‚ Programme delivery was expected to conclude within a 10 year timeframe whereas the current programme is for 15 years. Given the extended life of the programme, discounted HMT WLC cost have increased but are still within the original programme WLC.","benefits":107.3,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 74 to 107. This is primarily due to the following factors‚ Monetised benefits represent estate running cost savings as a result of exiting legacy estate and moving into new Regional Centres and Specialist sites.","themes":["Cost & funding","Delivery & schedule","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The programme has successfully delivered 12 award winning, greener offices enabling smarter working and accommodating over 40 government departments. We are…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":-1,"transition":"Improved","endDateDeltaDays":0,"attentionScore":2,"attentionReasons":["In-year forecast variance is +5.3%"]},{"id":"DBT_0295_2526-Q2","year":2026,"name":"Drive 35","department":"DBT","category":"Infrastructure and Construction","description":"DRIVE35 is a cross-government major programme led by DBT to support the end-to-end transformation of the UK automotive sector, with a focus on accelerating the transition to zero-emission vehicles and strengthening domestic manufacturing capability. The programme brings together a portfolio of interventions including capital grants, R&D support, and scale-up financing to support both early-stage innovation and commercial deployment. It targets strategic segments of the automotive supply chain, including battery manufacturing, power electronics, and critical component production, with the aim of securing long-term investment, enhancing UK competitiveness, and supporting regional economic growth. DRIVE35 is designed as an integrated offer, working with partners across government and delivery bodies to provide blended finance and coordinated policy support. It aims to crowd in private investment, enable the development of industrial clusters, and support companies from innovation through to industrialisation.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"This is the first annual report for DRIVE35, the Delivery Confidence Assessment (DCA) rating at 25/26 Q4 is rated Green. This reflects a programme that is delivering substantial strategic value while accepting there are a number of delivery and operational challenges typical of a complex cross-government portfolio. Key factors influencing the assessment include: organisational changes and resourcing pressures affecting delivery capacity and continuity; the complexity of governance arrangements across policy, delivery, and external partners; and the need to maintain pace and clarity in decision-making to remain internationally competitive. The Department has taken steps to mitigate these risks through strengthening programme management capability, enhancing PMO support, and increasing focus on strategic risk management and governance maturity. There is active senior oversight through established boards and regular risk review processes. Overall, while challenges remain, the programme is considered deliverable with continued focus on strengthening delivery capability, improving process efficiency, and maintaining a clear strategic narrative for investors and stakeholders.","startDate":null,"endDate":"2030-04-30","scheduleNarrative":"This is the first annual report for DRIVE35, the Programme end date is currently 31/03/2030 with a planned 5 year extension to March 2035.","fyBaseline":281.49,"fyForecast":266.92,"fyVariance":5.18,"varianceNarrative":"The budget variance is less than or equal to 5%","wholeLifeCost":1841.78,"costNarrative":"This is the first annual report for DRIVE35, the Programme Whole life costs are £2.04bn.","benefits":20338.15,"benefitsNarrative":"This is the first annual report for DRIVE35, the Programme DRIVE35, benefits at 25/26 Q4 are reported at £2,397.4m.","themes":["Delivery & schedule","Governance & assurance","Workforce & capability","Cost & funding"],"evidenceExcerpt":"This is the first annual report for DRIVE35, the Delivery Confidence Assessment (DCA) rating at 25/26 Q4 is rated Green. This reflects a programme that is delivering substantial strategic value while accepting there are a number of delivery and operational challenges typical of a complex cross-government portfolio. Key factors influencing the assessment…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"DBT_0295_2526-Q2","year":2026,"name":"Drive 35","department":"DBT","category":"Infrastructure and Construction","description":"DRIVE35 is a cross-government major programme led by DBT to support the end-to-end transformation of the UK automotive sector, with a focus on accelerating the transition to zero-emission vehicles and strengthening domestic manufacturing capability. The programme brings together a portfolio of interventions including capital grants, R&D support, and scale-up financing to support both early-stage innovation and commercial deployment. It targets strategic segments of the automotive supply chain, including battery manufacturing, power electronics, and critical component production, with the aim of securing long-term investment, enhancing UK competitiveness, and supporting regional economic growth. DRIVE35 is designed as an integrated offer, working with partners across government and delivery bodies to provide blended finance and coordinated policy support. It aims to crowd in private investment, enable the development of industrial clusters, and support companies from innovation through to industrialisation.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"This is the first annual report for DRIVE35, the Delivery Confidence Assessment (DCA) rating at 25/26 Q4 is rated Green. This reflects a programme that is delivering substantial strategic value while accepting there are a number of delivery and operational challenges typical of a complex cross-government portfolio. Key factors influencing the assessment include: organisational changes and resourcing pressures affecting delivery capacity and continuity; the complexity of governance arrangements across policy, delivery, and external partners; and the need to maintain pace and clarity in decision-making to remain internationally competitive. The Department has taken steps to mitigate these risks through strengthening programme management capability, enhancing PMO support, and increasing focus on strategic risk management and governance maturity. There is active senior oversight through established boards and regular risk review processes. Overall, while challenges remain, the programme is considered deliverable with continued focus on strengthening delivery capability, improving process efficiency, and maintaining a clear strategic narrative for investors and stakeholders.","startDate":null,"endDate":"2030-04-30","scheduleNarrative":"This is the first annual report for DRIVE35, the Programme end date is currently 31/03/2030 with a planned 5 year extension to March 2035.","fyBaseline":281.49,"fyForecast":266.92,"fyVariance":5.18,"varianceNarrative":"The budget variance is less than or equal to 5%","wholeLifeCost":1841.78,"costNarrative":"This is the first annual report for DRIVE35, the Programme Whole life costs are £2.04bn.","benefits":20338.15,"benefitsNarrative":"This is the first annual report for DRIVE35, the Programme DRIVE35, benefits at 25/26 Q4 are reported at £2,397.4m.","themes":["Delivery & schedule","Governance & assurance","Workforce & capability","Cost & funding"],"evidenceExcerpt":"This is the first annual report for DRIVE35, the Delivery Confidence Assessment (DCA) rating at 25/26 Q4 is rated Green. This reflects a programme that is delivering substantial strategic value while accepting there are a number of delivery and operational challenges typical of a complex cross-government portfolio. Key factors influencing the assessment…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":null,"ratingDelta":null,"transition":"Not comparable","endDateDeltaDays":null,"attentionScore":2,"attentionReasons":["In-year forecast variance is +5.2%"]},{"id":"MOJ_0259_2324-Q1","year":2026,"name":"Secure Children's Homes Commissioning","department":"MOJ","category":"Government Transformation and Service Delivery","description":"The project aims to improve children's experiences in custody and their life outcomes by ensuring that there is an aligned cross government approach to Secure Children's Homes and that justice provision is commissioned to deliver consistently optimal care.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25-Q4, the Delivery Confidence Assessment at 25/26-Q4 has increased to Green. This is due to the completion of all transition activities. The project is on schedule to close in line with project plan.","startDate":"2022-07-28","endDate":"2026-04-30","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end date at 25/26-Q4 changed from 31/03/26 to 30/04/26. This is primarily due to the project allowing additional time to ensure a full closure process is completed.","fyBaseline":10.56,"fyForecast":11.07,"fyVariance":4.83,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":270.91,"costNarrative":"Compared to financial year 24/25-Q4, the project's Whole Life Costs at 25/26-Q4 increased from £246.01m to £270.91m. This is primarily due to the additional funds being made available to maintain as much capacity as possible within the custodial sector. All costs have been reported in 2024/25 base prices in line with NISTA requirements. This is a change from previous years where costs were reported in nominal prices. All costs reflect this accounting reduction regardless of any actual changes.","benefits":null,"benefitsNarrative":"This project currently reports no monetised benefits. The project benefits focus on the quality of services contracts.","themes":["Cost & funding","Delivery & schedule","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 24/25-Q4, the Delivery Confidence Assessment at 25/26-Q4 has increased to Green. This is due to the completion of all transition activities. The project is on schedule to close in line with project plan. Compared to financial year 24/25-Q4, the project's end date at 25/26-Q4 changed from 31/03/26 to 30/04/26. This is primarily due…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"MOJ_0259_2324-Q1","year":2024,"name":"Secure Children's Homes Commissioning","department":"MOJ","category":"Government Transformation and Service Delivery","description":"The project aims to improve children's experiences in custody and their life outcomes by ensuring that there is an aligned cross government approach to Secure Children's Homes and that justice provision is commissioned to deliver consistently optimal care.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. This is the first time data has been published for this project, which has been added to GMPP over the last year. The Amber Delivery Confidence Assessment is driven by inflation risks contributing to the increasing cost estimate, which is greater than that estimated previously.","startDate":"2022-07-28","endDate":"2026-04-01","scheduleNarrative":"The project's end-date at 23/24-Q4 is 2026-04-01. This is primarily due to the following factors. The project is on track to deliver against the baselined schedule.","fyBaseline":31.4,"fyForecast":30.8,"fyVariance":-2.0,"varianceNarrative":"The budget variance is inferior or equal to 5%.","wholeLifeCost":390.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 23/24-Q4 is 390m. This is primarily due to the following factors. The Whole Life Costs are based on the most recent business case and include optimism bias.","benefits":0.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 0m. This project currently reports no monetised benefits. The project benefits focus on the quality of services contracts.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. This is the first time data has been published for this project, which has been added to GMPP over the last year. The Amber Delivery Confidence Assessment is driven by inflation risks contributing to the increasing cost…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"MOJ_0259_2324-Q1","year":2025,"name":"Secure Children's Homes Commissioning","department":"MoJ","category":"Government Transformation and Service Delivery","description":"The project aims to improve children's experiences in custody and their life outcomes by ensuring that there is an aligned cross government approach to Secure Children's Homes and that justice provision is commissioned to deliver consistently optimal care.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Inflation risks could increase the cost estimate.","startDate":"2022-07-28","endDate":"2026-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 decreased from 01/04/2026 to 31/03/2026. This is primarily due to the following factors‚ The project is on track to deliver against the baseline schedule.","fyBaseline":1.51,"fyForecast":1.43,"fyVariance":5.3,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":246.01,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 390 to 246. This is primarily due to the following factors‚ The decrease reflects the removal of previous contract running costs from before the project started.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ This project currently reports no monetised benefits. The project benefits focus on the quality of services contracts.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Inflation risks could increase the cost estimate. Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 decreased from 01/04/2026 to 31/03/2026.…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"MOJ_0259_2324-Q1","year":2026,"name":"Secure Children's Homes Commissioning","department":"MOJ","category":"Government Transformation and Service Delivery","description":"The project aims to improve children's experiences in custody and their life outcomes by ensuring that there is an aligned cross government approach to Secure Children's Homes and that justice provision is commissioned to deliver consistently optimal care.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25-Q4, the Delivery Confidence Assessment at 25/26-Q4 has increased to Green. This is due to the completion of all transition activities. The project is on schedule to close in line with project plan.","startDate":"2022-07-28","endDate":"2026-04-30","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end date at 25/26-Q4 changed from 31/03/26 to 30/04/26. This is primarily due to the project allowing additional time to ensure a full closure process is completed.","fyBaseline":10.56,"fyForecast":11.07,"fyVariance":4.83,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":270.91,"costNarrative":"Compared to financial year 24/25-Q4, the project's Whole Life Costs at 25/26-Q4 increased from £246.01m to £270.91m. This is primarily due to the additional funds being made available to maintain as much capacity as possible within the custodial sector. All costs have been reported in 2024/25 base prices in line with NISTA requirements. This is a change from previous years where costs were reported in nominal prices. All costs reflect this accounting reduction regardless of any actual changes.","benefits":null,"benefitsNarrative":"This project currently reports no monetised benefits. The project benefits focus on the quality of services contracts.","themes":["Cost & funding","Delivery & schedule","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 24/25-Q4, the Delivery Confidence Assessment at 25/26-Q4 has increased to Green. This is due to the completion of all transition activities. The project is on schedule to close in line with project plan. Compared to financial year 24/25-Q4, the project's end date at 25/26-Q4 changed from 31/03/26 to 30/04/26. This is primarily due…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"MOJ_0259_2324-Q1","year":2025,"name":"Secure Children's Homes Commissioning","department":"MoJ","category":"Government Transformation and Service Delivery","description":"The project aims to improve children's experiences in custody and their life outcomes by ensuring that there is an aligned cross government approach to Secure Children's Homes and that justice provision is commissioned to deliver consistently optimal care.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Inflation risks could increase the cost estimate.","startDate":"2022-07-28","endDate":"2026-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 decreased from 01/04/2026 to 31/03/2026. This is primarily due to the following factors‚ The project is on track to deliver against the baseline schedule.","fyBaseline":1.51,"fyForecast":1.43,"fyVariance":5.3,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":246.01,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 390 to 246. This is primarily due to the following factors‚ The decrease reflects the removal of previous contract running costs from before the project started.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ This project currently reports no monetised benefits. The project benefits focus on the quality of services contracts.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Inflation risks could increase the cost estimate. Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 decreased from 01/04/2026 to 31/03/2026.…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":-1,"transition":"Improved","endDateDeltaDays":30,"attentionScore":2,"attentionReasons":["Published end date moved 30 days later"]},{"id":"DFT_0031_1819-Q1","year":2026,"name":"A428 BLACK CAT TO CAXTON GIBBET","department":"DFT","category":"Infrastructure and Construction","description":"The scheme provides a new off-line two lane dual carriageway between Black Cat roundabout on the A1 in Bedfordshire and Caxton Gibbet roundabout on the A428 in Cambridgeshire.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The SRO Delivery Confidence Assessment (DCA) rating remained Green in Q4 25/26, consistent with the position reported in Q4 24/25. The A428 Black Cat to Caxton Gibbet scheme passed the halfway point of its construction phase at the start of Q3 25/26 and continues to perform in line with agreed delivery commitments. Construction activity is progressing well across all key locations, including the Black Cat junction upgrade and the opening of new local junctions and route improvements. There have been no changes to the approved cost or benefits forecasts, and the scheme remains on track to deliver within the agreed funding envelope.","startDate":"2015-04-01","endDate":null,"scheduleNarrative":"Exempt under Section 43 - Commercial interests","fyBaseline":242.0,"fyForecast":232.37,"fyVariance":3.98,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Exempt under Section 43 - Commercial interests","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"The SRO Delivery Confidence Assessment (DCA) rating remained Green in Q4 25/26, consistent with the position reported in Q4 24/25. The A428 Black Cat to Caxton Gibbet scheme passed the halfway point of its construction phase at the start of Q3 25/26 and continues to perform in line with agreed delivery commitments. Construction activity is progressing well…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"DFT_0031_1819-Q1","year":2020,"name":"A428 Black Cat to Caxton Gibbet","department":"DFT","category":"Infrastructure and Construction","description":"The scheme provides a new off-line two lane dual carriageway between Black Cat roundabout on the A1 in Bedfordshire and Caxton Gibbet roundabout on the A428 in Cambridgeshire.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber/Green, which has not changed since last year�s Q2 1819 Amber/Green, due primarily to the following factors; - The Preferred Route Announcement was made on the 18 February 2019. The project milestones remain on track for delivery. - There continues to be strong stakeholder support and interest for this project demonstrated by the positive outcome from the Statutory Consultation - Funding for the delivery of this project has been included within the Roads Period 2 spending envelope announced in March 2020. The associated benefits case has been approved by Treasury. Since the Q2 1920 (30th September 2019) Amber/Green IPA DCA, the following non-project operating environment activities have impacted the original Q2 IPA DCA; - Changes in the Design Manual for Road and Bridges resulted in some design rework but this is not anticipated to affect overall programme. Changes in the uncertainty log resulting from increased developments and employment areas within the local plans are being analysed and will be included within the project design. - East West Rail Company have announced their corridor route for the central section (Bedford to Cambridge) which is currently expected to be constructed after the A428. Areas of potential overlap are being discussed to maximise the opportunity for close collaboration. Since the Q2 1920 (30th September 2019) Amber/Green IPA DCA, the following primary project actions have impacted the original Q2 IPA DCA; - Approval from HM Treasury in Feb 2020 followed by the announcement of funding of the project as part of RIS2 in the March 2020 Budget Statement. IPA recommendations from PAR in July and September 2019 have been actioned - Formal mobilisation of the Regional Delivery Partnership Framework (RDP) contract has begun for the project. This closed the IPA recommendation to engage with the RDP as soon as possible to finalise budget.","startDate":"2015-04-01","endDate":"2025-04-01","scheduleNarrative":"The scheduled baseline project end date at Q2 1920 (30th September 2019) is 01/04/25, has not changed since last year's Q2 1819 date of 01/04/25, due primarily to the following factors; - Formal mobilisation of RDP has commenced meaning that the production of the detailed design will run in parallel with the DCO allowing construction to begin early in 2022. The construction period remains unchanged. - The project schedule has been fully assessed and baselined. The project is currently undergoing budget setting with the contractor and once this work is completed a further review of the schedule can be undertaken. Since the Q2 1920 (30th September 2019) baseline project end date of 01/04/25, the following non-project operating environment activities have impacted the original Q2 baseline project end date; - The impact of Covid19 on the completion of environmental surveys and archaeological trial trenching may result in a delay to the DCO submission. The project team are assessing ways of mitigating this risk Since the Q2 1920 (30th September 2019) baseline project end date of 01/04/25, the following primary project actions have impacted the original Q2 baseline project end date; - Additional targeted consultation will be carried out to seek stakeholder views on a number of areas highlighted in the review of \"buildability\". This is scheduled for summer 2020 and the results will be fed into the DCO submission. This consultation will be \"virtual\" given the Covid 19 pandemic. - Covid 19 has resulted in one instance when site operations where closed for a week due to a staff member testing positive. Schedule impacts are being mitigated and future impacts being considered as pandemic restrictions develop and/or change.","fyBaseline":11.02,"fyForecast":19.3,"fyVariance":75.0,"varianceNarrative":"The 19/20 in-year baseline / forecast variance at Q2 1920 (30th September 2019) of 75%, is due primarily to the following factors; - The 2019-20 forecast increased from �11.02m to �19.3m as a result of delays to the Preferred Route Announcement in the previous financial year and reprofiling of future funds to allow the project to progress archaeological and ground investigation works and derisk the project. Since the Q2 1920 (30th September 2019) 19/20 in-year baseline / forecast variance of 75%, the following non-project operating environment activities have impacted the original Q2 19/20 in-year baseline / forecast variance; - The delay to the Preferred Route Announcement further delayed activities which were undertaken in 19/20. Since the Q2 1920 (30th September 2019) 19/20 in-year baseline / forecast variance of 75%, the following primary project actions have impacted the original Q2 19/20 in-year variance; - To inform the Development Consent Order, early contractor involvement has been built into the forecast as this will reduce risk and provide increased confidence in the proposed solution.","wholeLifeCost":809.98,"costNarrative":"The baseline Whole Life Cost at Q2 1920 (30th September 2019) is �809.98m, has not changed since last year's Q2 1819 (�m) baseline Whole Life Cost, due primarily to the following factors; - The project baseline has remained constant at �810m throughout the period. Since the Q2 1920 (30th September 2019) �809.98 m baseline Whole Life Cost, the following non-project operating environment activities have impacted the original baseline Q2 Whole Life Cost; - There are no non-project operating environment activities that have impacted the original baseline Q2 Whole Life Costs. Since the Q2 1920 (30th September 2019) �809.98 m baseline Whole Life Cost, the following primary project actions have impacted the original Q2 baseline Whole Life Cost; - The project compiled a new baseline estimate . The paper was approved by Treasury in early 2020 and reflects the most recent commercial estimate whole life cost. - The formal budget setting process has commenced within the Regional Delivery Partnership Framework. It is anticipated that due to the improved ways of working that a reduction in the Whole Life Cost is achievable and this approach will be fully documented.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Scope & requirements","Approvals & decisions"],"evidenceExcerpt":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber/Green, which has not changed since last year�s Q2 1819 Amber/Green, due primarily to the following factors; - The Preferred Route Announcement was made on the 18 February 2019. The project milestones remain on track for delivery. - There continues to be strong…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2020","sourceLabel":"IPA Annual Report 2019-20"},{"id":"DFT_0031_1819-Q1","year":2021,"name":"A428 Black Cat to Caxton Gibbet","department":"DFT","category":"Infrastructure and Construction","description":"The scheme provides a new off-line two lane dual carriageway between Black Cat roundabout on the A1 in Bedfordshire and Caxton Gibbet roundabout on the A428 in Cambridgeshire.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber/Green. This is primarily due to the following factors: With the projects submission and acceptance of the Development Consent Order (DCO), and now working with the Delivery Integration Partners under the Regional Delivery Partnership Framework (RDP) contract, the project can further develop it's delivery schedule. This will in turn inform the development of the Full Business Case.","startDate":"2015-04-01","endDate":"2025-04-01","scheduleNarrative":"Compared to financial year 19/20-Q2, the project's end-date remained scheduled to finish on 01 April 2025 . This is primarily due to the following factors: The A428 Black Cat to Caxton Gibbet Improvement project is currently in the development phase. Statutory Consultation (Jun-Jul 2019) and a supplementary non-statutory consultation (Jun-Jul 2020) have been completed, and the Development Consent Order (DCO) submission was made at the end of February 2021. The DCO Acceptance was received on 24 March 2021. A detailed DCO examination timetable will be issued by the Planning Inspectorate (PINS) in Q1 2021/22. The examination timetable will be incorporated into a formal re-baselining later in the summer (Q2 2021/22). The formal re-baselining will provide an update to both the Open for Traffic date and the project end date. There continues to be strong stakeholder support and interest for this project demonstrated by the results from Statutory Consultation and from feedback received at the events themselves. Subsequent engagements via community forums and technical working groups continues to demonstrate support for the project.","fyBaseline":25.0,"fyForecast":25.0,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%. The project was required to carry out additional consultation ahead of progressing to the Development Consent Order process. The budget variance was due to a delay in completion of the preliminary design stage required to accommodate the results of the additional consultation.","wholeLifeCost":812.5,"costNarrative":"Compared to financial year 19/20-Q2, the projects Baseline Whole Life Cost increased from �809.98m to �812.50m. This is primarily due to the following factors: The Budget Whole Life Cost has followed a central estimate which matures throughout the scheme budget setting process and continues to mature whilst we execute contracts with our delivery partners. Throughout the Development Consent Order process and Detailed Design stage the central estimate will continue to be developed and the forecast costs for construction will be assured further. These changes include changes in non recoverable VAT assessment. A revised Central Estimate will feed into the Full Business Case and account for all project costs and risks.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber/Green. This is primarily due to the following factors: With the projects submission and acceptance of the Development Consent Order (DCO), and now working with the Delivery Integration Partners under the Regional Delivery…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21"},{"id":"DFT_0031_1819-Q1","year":2022,"name":"A428 Black Cat to Caxton Gibbet","department":"DFT","category":"Infrastructure and Construction","description":"The scheme provides a new off-line two lane dual carriageway between Black Cat roundabout on the A1 in Bedfordshire and Caxton Gibbet roundabout on the A428 in Cambridgeshire.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 20/21-Q4, the Delivery Confidence Assessment rating at 21/22-Q4 increased from Amber/Green to Amber. The A428 Black Cat to Caxton Gibbet Project is currently in the development phase. The Development Consent Order (DCO) examination process has concluded and a decision from the Secretary of State's (SoS) is due by mid-August 2022. It is noted that any delay to DCO decision would have non-linear impact to the programme due to seasonal constraints.","startDate":"2015-04-01","endDate":"2027-09-09","scheduleNarrative":"Compared to 2021-Q4, your project end-date increased from 01 APR 2025 to 09 SEP 2027. This is primarily due to the following factors: The Development Consent Order (DCO) planning application was submitted on 26 February 2021 and the Examining Authority commenced the DCO examination in August 2021, 9 months later than forecast in the OBC. The project has since undertaken significant rework of the construction schedule to absorb this delay to the DCO, and the construction requirement for three summer earthwork seasons, whilst successfully maintaining the current Open for Traffic (OfT) date.","fyBaseline":48.3,"fyForecast":28.1,"fyVariance":-42.0,"varianceNarrative":"The DCO application was submitted later than anticipated to allow the incorporation of lessons learnt from other unsuccessful applications. The DCO examination also started later than expected due to a longer DCO pre-examination period imposed by PINS. As a result, the programme was rephased and the spike associated with the commencement of construction, budgeted in 2021/22 will now occur in the following year, subject to the DCO being granted in August 2022.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"","themes":["Approvals & decisions","Delivery & schedule","Commercial & supply chain","Cost & funding"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Delivery Confidence Assessment rating at 21/22-Q4 increased from Amber/Green to Amber. The A428 Black Cat to Caxton Gibbet Project is currently in the development phase. The Development Consent Order (DCO) examination process has concluded and a decision from the Secretary of State's (SoS) is due by mid-August 2022.…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"DFT_0031_1819-Q1","year":2023,"name":"A428 Black Cat to Caxton Gibbet","department":"DFT","category":"Infrastructure and Construction","description":"The scheme provides a new off-line two lane dual carriageway between Black Cat roundabout on the A1 in Bedfordshire and Caxton Gibbet roundabout on the A428 in Cambridgeshire.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 21/22-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. The A428 Black Cat to Caxton Gibbet Project is currently in the development phase. The Development Consent Order (DCO) process has concluded with Secretary of States (SoS) granting consent for the scheme August 2022. There have been delays to the schemes delivery plan milestones due to a Judicial Review challenge. The impact of delays associated with the legal process has significantly impacted the projects programme and cost. The project will be returning through governance beginning in Q2 2023/2024 for approval of an updated Full Business Case and re-baseline.","startDate":"2015-04-01","endDate":null,"scheduleNarrative":"There have been delays to the schemes delivery plan milestones due to a Judicial Review challenge. The impact of delays associated with the legal process has significantly impacted the projects programme. The project will be returning through governance with a full impact analysis of delay and re-baseline, ahead of Start of Works.","fyBaseline":60.0,"fyForecast":34.4,"fyVariance":-43.0,"varianceNarrative":"There have been delays to the schemes delivery plan milestones due to a Judicial Review challenge. The impact of delays associated with the legal process has significantly impacted the projects programme and cost. The scheme missed the planned Start of Works milestone for December 2022, which has decreased the in year costs reflecting the reduced activity necessitated by the legal challenge.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","themes":["Delivery & schedule","Governance & assurance","Approvals & decisions","Cost & funding"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. The A428 Black Cat to Caxton Gibbet Project is currently in the development phase. The Development Consent Order (DCO) process has concluded with Secretary of States (SoS)…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"DFT_0031_1819-Q1","year":2024,"name":"A428 Black Cat to Caxton Gibbet","department":"DFT","category":"Infrastructure and Construction","description":"The scheme provides a new off-line two lane dual carriageway between Black Cat roundabout on the A1 in Bedfordshire and Caxton Gibbet roundabout on the A428 in Cambridgeshire.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 22/23-Q4, Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 decreased from Amber to Green. This is primarily due to the following factors. The A428 Black Cat to Caxton Gibbet is in the construction phase, achieving Start of Works milestone in November 2023. Chief Secretary to the Treasury approval of the updated Full Business Case and release full funding for the scheme was received in October 2023.","startDate":"2015-04-01","endDate":null,"scheduleNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","fyBaseline":57.1,"fyForecast":60.0,"fyVariance":5.0,"varianceNarrative":"The budget variance is inferior or equal to 5%.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","themes":["Commercial & supply chain","Cost & funding","Approvals & decisions","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 decreased from Amber to Green. This is primarily due to the following factors. The A428 Black Cat to Caxton Gibbet is in the construction phase, achieving Start of Works milestone in November 2023. Chief Secretary to the Treasury approval of the…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"DFT_0031_1819-Q1","year":2025,"name":"A428 BLACK CAT TO CAXTON GIBBET","department":"DfT","category":"Infrastructure and Construction","description":"The scheme provides a new off-line two lane dual carriageway between Black Cat roundabout on the A1 in Bedfordshire and Caxton Gibbet roundabout on the A428 in Cambridgeshire.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at GREEN. This is primarily due to the following factors‚ The A428 Black Cat to Caxton Gibbet is now over one year into the construction phase and remains on plan against the delivery commitments. Construction activities are progressing at pace with significant progress being made across the length and breadth of the scheme. The scheme has begun on the construction of all 18 new bridges and in early 2025 the scheme opened the first road bridge and junction to traffic. There have been no changes to the cost or benefits forecasts and remain on target and within approved funding.","startDate":"2015-04-01","endDate":null,"scheduleNarrative":"Section 43 - Commercial interests","fyBaseline":245.32,"fyForecast":237.92,"fyVariance":3.02,"varianceNarrative":"The budget variance is less than or equal to 5%. The budget variance is less than or equal to 5%.","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Section 43 - Commercial interests","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at GREEN. This is primarily due to the following factors‚ The A428 Black Cat to Caxton Gibbet is now over one year into the construction phase and remains on plan against the delivery commitments. Construction activities are…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"DFT_0031_1819-Q1","year":2026,"name":"A428 BLACK CAT TO CAXTON GIBBET","department":"DFT","category":"Infrastructure and Construction","description":"The scheme provides a new off-line two lane dual carriageway between Black Cat roundabout on the A1 in Bedfordshire and Caxton Gibbet roundabout on the A428 in Cambridgeshire.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The SRO Delivery Confidence Assessment (DCA) rating remained Green in Q4 25/26, consistent with the position reported in Q4 24/25. The A428 Black Cat to Caxton Gibbet scheme passed the halfway point of its construction phase at the start of Q3 25/26 and continues to perform in line with agreed delivery commitments. Construction activity is progressing well across all key locations, including the Black Cat junction upgrade and the opening of new local junctions and route improvements. There have been no changes to the approved cost or benefits forecasts, and the scheme remains on track to deliver within the agreed funding envelope.","startDate":"2015-04-01","endDate":null,"scheduleNarrative":"Exempt under Section 43 - Commercial interests","fyBaseline":242.0,"fyForecast":232.37,"fyVariance":3.98,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Exempt under Section 43 - Commercial interests","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"The SRO Delivery Confidence Assessment (DCA) rating remained Green in Q4 25/26, consistent with the position reported in Q4 24/25. The A428 Black Cat to Caxton Gibbet scheme passed the halfway point of its construction phase at the start of Q3 25/26 and continues to perform in line with agreed delivery commitments. Construction activity is progressing well…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"DFT_0031_1819-Q1","year":2025,"name":"A428 BLACK CAT TO CAXTON GIBBET","department":"DfT","category":"Infrastructure and Construction","description":"The scheme provides a new off-line two lane dual carriageway between Black Cat roundabout on the A1 in Bedfordshire and Caxton Gibbet roundabout on the A428 in Cambridgeshire.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at GREEN. This is primarily due to the following factors‚ The A428 Black Cat to Caxton Gibbet is now over one year into the construction phase and remains on plan against the delivery commitments. Construction activities are progressing at pace with significant progress being made across the length and breadth of the scheme. The scheme has begun on the construction of all 18 new bridges and in early 2025 the scheme opened the first road bridge and junction to traffic. There have been no changes to the cost or benefits forecasts and remain on target and within approved funding.","startDate":"2015-04-01","endDate":null,"scheduleNarrative":"Section 43 - Commercial interests","fyBaseline":245.32,"fyForecast":237.92,"fyVariance":3.02,"varianceNarrative":"The budget variance is less than or equal to 5%. The budget variance is less than or equal to 5%.","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Section 43 - Commercial interests","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at GREEN. This is primarily due to the following factors‚ The A428 Black Cat to Caxton Gibbet is now over one year into the construction phase and remains on plan against the delivery commitments. Construction activities are…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":null,"attentionScore":0,"attentionReasons":[]},{"id":"DCMS_0254_2324-Q1","year":2026,"name":"British Museum - Energy Centre Programme (ECP)","department":"DCMS","category":"Infrastructure and Construction","description":"The Energy Centre Programme is a programme of major infrastructure works that are designed to improve energy generation, rationalise services distribution, and provide improved resilience for the Bloomsbury estate. The project is a key enabler which will support ongoing asset and infrastructure renewal and the emerging aspirations of the Museum’s Masterplan. Some of the key elements of the project include – · Review of the Museum’s energy strategy and development of an energy transition plan · Development of a new primary services infrastructure strategy for the Bloomsbury estate · Design, construction and mobilisation of a new energy centre Delivery of a new low carbon, energy efficient heating and cooling system that helps pave the way to a net zero future.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to the financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at GREEN. The last review was conducted in October 2024, with the next review being due in October 2026. The Energy Centre Programme has generally been progressed over the last 12 months on schedule against the agreed programme and within budget. The two main building contracts were awarded on schedule and within budget in both instances.","startDate":"2022-04-01","endDate":"2029-12-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same at 31/12/2029. This is primarily due to the following factors: The early stage enabling works projects have been completed within the agreed programme. Any delays that have been incurred to date on the construction of the East Road Building have been non-critical to the overall programme. The two main building contracts (SWEC Main Works and SWEC MEP) works are currently being progressed in line with scheduled completion dates in June 2029.","fyBaseline":20.15,"fyForecast":20.15,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than 5%. Individual projects have generally been progressed in line with planned schedules and cashflow forecasts thereby avoiding a potential underspend. There has been minimal client-driven change during the period, and the discovery-related change has been contained within allocated risk allowances, thereby avoiding a potential overspend.","wholeLifeCost":181.97,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) remained at £194m. This is primarily due to the following factors: Procurement of the two main building contracts within budget. Change managed within allocated risk allowances. No significant commercial claims from contractors Please note figures referenced in the narratives were entered as nominal and the system automatically converts them to Real Terms.","benefits":192.57,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at £350m. There has been no change to the original underlying assumptions at this stage, so there is no change to the calculated benefits.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Commercial & supply chain"],"evidenceExcerpt":"Compared to the financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at GREEN. The last review was conducted in October 2024, with the next review being due in October 2026. The Energy Centre Programme has generally been progressed over the last 12 months on schedule against the agreed programme and within…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"DCMS_0254_2324-Q1","year":2024,"name":"British Museum Energy Centre Programme (ECP)","department":"DCMS","category":"Infrastructure and Construction","description":"Develop a coherent, site-wide approach to infrastructure, powered by a new state of the art energy transition hub. with the objectives to: Reduce carbon emissions To reduce and mitigate critical risks of harm to people, buildings and collection, and of service failure leading to localised or complete closure of the Museum. To enable future phases of the masterplan, e.g. by unlocking planning permission, creating essential space and enabling access.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. The project's IPA DCA rating is Amber. This is primarily due to the following factors: the Full Business Case was not approved by HMT at the time of the rating. Due to the nature of the programme's staged procurement, the main contacts have not yet been tendered. Since the issue of IPA's Amber DCA, the programme has received HMT approval for the Full Business Case. The programme team continue to develop changes in response to the IPA review recommendations from January 2024.","startDate":"2022-04-01","endDate":"2029-12-31","scheduleNarrative":"The project's end-date at 23/24-Q4 is 2029-12-31. This is primarily due to the following factors: the programme remains on schedule to deliver its objectives by 31 December 2029.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"The budget variance is inferior or equal to 5%. Flexibility to apply funding temporarily to other projects has been utilised and reported accordingly here.","wholeLifeCost":209.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 23/24-Q4 is 209m. This is primarily due to the following factors: the budgeted whole life costs are from the HMT approved Full Business Case.","benefits":351.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 351m.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Commercial & supply chain"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. The project's IPA DCA rating is Amber. This is primarily due to the following factors: the Full Business Case was not approved by HMT at the time of the rating. Due to the nature of the programme's staged…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"DCMS_0254_2324-Q1","year":2025,"name":"British Museum - Energy Centre Programme (ECP)","department":"DCMS","category":"Infrastructure and Construction","description":"As an essential step towards the BM’s net zero-carbon future and a more resilient estate, the Energy Centre Programme will introduce a coherent, site-wide approach to infrastructure, powered by a new state-of-the-art energy transition hub. This project will improve resilience and flexibility, reduce risk to the collection, and release valuable space on a crowded site. Replacing inefficient plant and introducing greater simplicity will improve operating efficiency and reduce the increasing burden of maintenance programmes.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors‚ - The Stage 4 design was progressing well with no major issues or problems. - The programme had sufficient contingency to meet costs. - A delivery manager had been appointed and was in the process of being embedded within the wider programme team. - The major planning consents had been granted, with only more minor ones pending. The conclusion of the Review Team (RT) following the IPA review was that there were no major outstanding issues that threatened the delivery of the programme at that stage, and that the strategic case for the programme was in the RT’s view, sensible.","startDate":"2022-04-01","endDate":"2029-12-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/12/2029. This is primarily due to the following factors‚ - Although there have been delays to the programme that have affected the expenditure profile as detailed in the response to the in year variance question below, these delays are covered by the in-built programme contingency allowance meaning that the programme end date remains unchanged. - The construction of the East Road Building is progressing on programme. - The South-West Energy Centre enabling works are progressing on programme.","fyBaseline":36.2,"fyForecast":12.3,"fyVariance":66.02,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ - Delay to ERB planning approval and Section 106 agreement. - Delay to the completion of staff decant enabling works (39 Russell Square project). - Delay to the issue of survey information which subsequently delayed the design programme. - Delay to the main works procurement timeline due to market capacity. - Delay to the completion of ERB Enabling Works and subsequent delay to the commencement of ERB Main Works. - Contingency – An exercise was undertaken during the year to revisit the contingency levels and as a result £15m of contingency was removed from the overall budget.","wholeLifeCost":209.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 209. This is primarily due to the following factors‚ An exercise was undertaken during the 24/25 to revisit the contingency levels and as a result £15m of contingency was removed from the overall budget so the updated agreed whole life cost of the project is now £194m","benefits":351.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 351. This is primarily due to the following factors‚ There has been no change to the original underlying assumptions and so there is no change to the calculated benefits.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors‚ - The Stage 4 design was progressing well with no major issues or problems. - The programme had sufficient contingency to meet costs. - A delivery manager…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"DCMS_0254_2324-Q1","year":2026,"name":"British Museum - Energy Centre Programme (ECP)","department":"DCMS","category":"Infrastructure and Construction","description":"The Energy Centre Programme is a programme of major infrastructure works that are designed to improve energy generation, rationalise services distribution, and provide improved resilience for the Bloomsbury estate. The project is a key enabler which will support ongoing asset and infrastructure renewal and the emerging aspirations of the Museum’s Masterplan. Some of the key elements of the project include – · Review of the Museum’s energy strategy and development of an energy transition plan · Development of a new primary services infrastructure strategy for the Bloomsbury estate · Design, construction and mobilisation of a new energy centre Delivery of a new low carbon, energy efficient heating and cooling system that helps pave the way to a net zero future.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to the financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at GREEN. The last review was conducted in October 2024, with the next review being due in October 2026. The Energy Centre Programme has generally been progressed over the last 12 months on schedule against the agreed programme and within budget. The two main building contracts were awarded on schedule and within budget in both instances.","startDate":"2022-04-01","endDate":"2029-12-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same at 31/12/2029. This is primarily due to the following factors: The early stage enabling works projects have been completed within the agreed programme. Any delays that have been incurred to date on the construction of the East Road Building have been non-critical to the overall programme. The two main building contracts (SWEC Main Works and SWEC MEP) works are currently being progressed in line with scheduled completion dates in June 2029.","fyBaseline":20.15,"fyForecast":20.15,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than 5%. Individual projects have generally been progressed in line with planned schedules and cashflow forecasts thereby avoiding a potential underspend. There has been minimal client-driven change during the period, and the discovery-related change has been contained within allocated risk allowances, thereby avoiding a potential overspend.","wholeLifeCost":181.97,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) remained at £194m. This is primarily due to the following factors: Procurement of the two main building contracts within budget. Change managed within allocated risk allowances. No significant commercial claims from contractors Please note figures referenced in the narratives were entered as nominal and the system automatically converts them to Real Terms.","benefits":192.57,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at £350m. There has been no change to the original underlying assumptions at this stage, so there is no change to the calculated benefits.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Commercial & supply chain"],"evidenceExcerpt":"Compared to the financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at GREEN. The last review was conducted in October 2024, with the next review being due in October 2026. The Energy Centre Programme has generally been progressed over the last 12 months on schedule against the agreed programme and within…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"DCMS_0254_2324-Q1","year":2025,"name":"British Museum - Energy Centre Programme (ECP)","department":"DCMS","category":"Infrastructure and Construction","description":"As an essential step towards the BM’s net zero-carbon future and a more resilient estate, the Energy Centre Programme will introduce a coherent, site-wide approach to infrastructure, powered by a new state-of-the-art energy transition hub. This project will improve resilience and flexibility, reduce risk to the collection, and release valuable space on a crowded site. Replacing inefficient plant and introducing greater simplicity will improve operating efficiency and reduce the increasing burden of maintenance programmes.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors‚ - The Stage 4 design was progressing well with no major issues or problems. - The programme had sufficient contingency to meet costs. - A delivery manager had been appointed and was in the process of being embedded within the wider programme team. - The major planning consents had been granted, with only more minor ones pending. The conclusion of the Review Team (RT) following the IPA review was that there were no major outstanding issues that threatened the delivery of the programme at that stage, and that the strategic case for the programme was in the RT’s view, sensible.","startDate":"2022-04-01","endDate":"2029-12-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/12/2029. This is primarily due to the following factors‚ - Although there have been delays to the programme that have affected the expenditure profile as detailed in the response to the in year variance question below, these delays are covered by the in-built programme contingency allowance meaning that the programme end date remains unchanged. - The construction of the East Road Building is progressing on programme. - The South-West Energy Centre enabling works are progressing on programme.","fyBaseline":36.2,"fyForecast":12.3,"fyVariance":66.02,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ - Delay to ERB planning approval and Section 106 agreement. - Delay to the completion of staff decant enabling works (39 Russell Square project). - Delay to the issue of survey information which subsequently delayed the design programme. - Delay to the main works procurement timeline due to market capacity. - Delay to the completion of ERB Enabling Works and subsequent delay to the commencement of ERB Main Works. - Contingency – An exercise was undertaken during the year to revisit the contingency levels and as a result £15m of contingency was removed from the overall budget.","wholeLifeCost":209.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 209. This is primarily due to the following factors‚ An exercise was undertaken during the 24/25 to revisit the contingency levels and as a result £15m of contingency was removed from the overall budget so the updated agreed whole life cost of the project is now £194m","benefits":351.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 351. This is primarily due to the following factors‚ There has been no change to the original underlying assumptions and so there is no change to the calculated benefits.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors‚ - The Stage 4 design was progressing well with no major issues or problems. - The programme had sufficient contingency to meet costs. - A delivery manager…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":0,"attentionScore":0,"attentionReasons":[]},{"id":"DLUHC_0364_2324-Q4","year":2026,"name":"Brownfield, Infrastructure & Land (BIL)","department":"MHCLG","category":"Infrastructure and Construction","description":"Launched in July 2023, the Brownfield Infrastructure and Land (BIL) fund is a £1.5 billion programme designed to regenerate underused land and deliver transport links, boost local areas by transforming disused sites and investing in vital infrastructure, such as GP surgeries, primary schools and access roads and funding the decontamination of previously used land.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 increased to Green. This uplift is driven by BIL meeting and exceeding its target metrics (67k housing capacity unlocked against a 65.5k target, 500k sqm employment floorspace unlocked against a 200k sqm target, and 78% funding used on brownfield projects against a 72% target). Furthermore, all delivery partners have established strong delivery pipelines, providing a clear and credible route to future delivery. Key risks remain, particularly around cost pressures, contractor capacity and the Building Safety Act - particularly for higher-risk and more complex developments, which are generating additional design costs, extending pre-commencement timescales, and increased regulatory burden for developers.","startDate":"2023-07-01","endDate":"2031-03-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 increased from 31/03/2029 to 31/03/2031. The extension is isolated rather than programme-wide is driven by a single BIL National Project, which has received approval to spend BIL funds in 2029/30 and 2030/31. All other BIL projects remain on track to complete construction and spend by the original end date of 31 March 2029.","fyBaseline":400.33,"fyForecast":400.33,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":1506.89,"costNarrative":"The WLC has increased by £9m. This reflects Homes England’s approach to use existing BIL projects to bridge the gap ahead of the National Housing Delivery Fund (NHDF) launch on 1 April 2026, alongside adjustments for inflation in real terms. This has been enabled by combining NHDF funding into a single, flexible pot, allowing Homes England to move funding between new and existing activity as needed. This flexibility is now reflected in the updated departmental baseline.","benefits":2654.4,"benefitsNarrative":"Whilst our expectation on the level of benefits remains unchanged, the benefits strategy and benefits realisation planning is being finalised. Key benefits are expected to include increased employment floorspace, net additional homes (including breakdown by tenure), and enhanced social and physical infrastructure delivery, with programme-end evaluation expected to monetise the impact of infrastructure outputs. The BIL programme has piloted the collection of data on infrastructure outputs and is now receiving information from delivery partners on outputs such as number of schools, utilities, healthcare facilities, public realm, bridges, rail stations and km of road enabled by BIL.","themes":["Cost & funding","Delivery & schedule","Workforce & capability","Approvals & decisions"],"evidenceExcerpt":"The SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 increased to Green. This uplift is driven by BIL meeting and exceeding its target metrics (67k housing capacity unlocked against a 65.5k target, 500k sqm employment floorspace unlocked against a 200k sqm target, and 78% funding used on brownfield projects against a 72% target). Furthermore, all…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"DLUHC_0364_2324-Q4","year":2025,"name":"Brownfield, Infrastructure & Land (BIL)","department":"MHCLG","category":"Infrastructure and Construction","description":"Launched in July 2023, the Brownfield Infrastructure and Land (BIL) fund is a £1.5 billion programme designed to regenerate underused land and deliver transport links; boost local areas by transforming disused sites and investing in vital infrastructure, such as GP surgeries, primary schools and access roads; and fund the decontamination of previously used land. BIL is expected to unlock the construction of 65,500 homes and 200,000 sqm of employment floorspace.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER. This is due to‚ Delivery confidence remains Amber, given various risks the programme could face as it transitions into the delivery phase, including potential cost increases and impacts of the Building Safety Act (which may cause delays to project approvals and/or changes to scope). Proactive risk management occurs at project and programme level through risk assessments, regular progress reviews, contingency planning, and escalation where required. BIL is currently on track to achieve its programme targets. The next financial year is expected to be the peak year for expenditure.","startDate":"2023-07-24","endDate":null,"scheduleNarrative":"The project's end-date at 24/25-Q4 is scheduled to be 31/03/2029. This is primarily due to the following factors: There are no changes to the schedule. The final completions for the programme are still planned for the end of the 2028/29 financial year.","fyBaseline":275.58,"fyForecast":242.1,"fyVariance":12.15,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ In March 2025, some BIL spend was reprofiled into the next Financial Year to allow for a key strategic acquisition, resulting in a 12% budget shortfall which will be met in Financial Year 2025/26.","wholeLifeCost":1497.79,"costNarrative":"The project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) is 1,497. This is primarily due to the following factors‚ At Spending Review 21 a package of investment was announced to drive economic growth by investing in new housing-led brownfield, infrastructure, and land projects in England, unlocking construction of 65,500 homes. Budgets profiles have recently been updated as part of the spending review process, with no change to WLC.","benefits":2957.0,"benefitsNarrative":"The project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) is 2957. This is primarily due to the following factors‚ Key monetised benefits are expected to be: increased land value uplift from residential and commercial developments, health benefits from affordable housing and distributional benefits from affordable housing. Further benefits realisation planning will be undertaken in Financial Year 25/26, providing a more accurate projection of the anticipated benefits.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER. This is due to‚ Delivery confidence remains Amber, given various risks the programme could face as it transitions into the delivery phase, including potential cost increases and impacts of the Building Safety Act (which may cause delays to project approvals…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"DLUHC_0364_2324-Q4","year":2026,"name":"Brownfield, Infrastructure & Land (BIL)","department":"MHCLG","category":"Infrastructure and Construction","description":"Launched in July 2023, the Brownfield Infrastructure and Land (BIL) fund is a £1.5 billion programme designed to regenerate underused land and deliver transport links, boost local areas by transforming disused sites and investing in vital infrastructure, such as GP surgeries, primary schools and access roads and funding the decontamination of previously used land.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 increased to Green. This uplift is driven by BIL meeting and exceeding its target metrics (67k housing capacity unlocked against a 65.5k target, 500k sqm employment floorspace unlocked against a 200k sqm target, and 78% funding used on brownfield projects against a 72% target). Furthermore, all delivery partners have established strong delivery pipelines, providing a clear and credible route to future delivery. Key risks remain, particularly around cost pressures, contractor capacity and the Building Safety Act - particularly for higher-risk and more complex developments, which are generating additional design costs, extending pre-commencement timescales, and increased regulatory burden for developers.","startDate":"2023-07-01","endDate":"2031-03-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 increased from 31/03/2029 to 31/03/2031. The extension is isolated rather than programme-wide is driven by a single BIL National Project, which has received approval to spend BIL funds in 2029/30 and 2030/31. All other BIL projects remain on track to complete construction and spend by the original end date of 31 March 2029.","fyBaseline":400.33,"fyForecast":400.33,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":1506.89,"costNarrative":"The WLC has increased by £9m. This reflects Homes England’s approach to use existing BIL projects to bridge the gap ahead of the National Housing Delivery Fund (NHDF) launch on 1 April 2026, alongside adjustments for inflation in real terms. This has been enabled by combining NHDF funding into a single, flexible pot, allowing Homes England to move funding between new and existing activity as needed. This flexibility is now reflected in the updated departmental baseline.","benefits":2654.4,"benefitsNarrative":"Whilst our expectation on the level of benefits remains unchanged, the benefits strategy and benefits realisation planning is being finalised. Key benefits are expected to include increased employment floorspace, net additional homes (including breakdown by tenure), and enhanced social and physical infrastructure delivery, with programme-end evaluation expected to monetise the impact of infrastructure outputs. The BIL programme has piloted the collection of data on infrastructure outputs and is now receiving information from delivery partners on outputs such as number of schools, utilities, healthcare facilities, public realm, bridges, rail stations and km of road enabled by BIL.","themes":["Cost & funding","Delivery & schedule","Workforce & capability","Approvals & decisions"],"evidenceExcerpt":"The SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 increased to Green. This uplift is driven by BIL meeting and exceeding its target metrics (67k housing capacity unlocked against a 65.5k target, 500k sqm employment floorspace unlocked against a 200k sqm target, and 78% funding used on brownfield projects against a 72% target). Furthermore, all…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"DLUHC_0364_2324-Q4","year":2025,"name":"Brownfield, Infrastructure & Land (BIL)","department":"MHCLG","category":"Infrastructure and Construction","description":"Launched in July 2023, the Brownfield Infrastructure and Land (BIL) fund is a £1.5 billion programme designed to regenerate underused land and deliver transport links; boost local areas by transforming disused sites and investing in vital infrastructure, such as GP surgeries, primary schools and access roads; and fund the decontamination of previously used land. BIL is expected to unlock the construction of 65,500 homes and 200,000 sqm of employment floorspace.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER. This is due to‚ Delivery confidence remains Amber, given various risks the programme could face as it transitions into the delivery phase, including potential cost increases and impacts of the Building Safety Act (which may cause delays to project approvals and/or changes to scope). Proactive risk management occurs at project and programme level through risk assessments, regular progress reviews, contingency planning, and escalation where required. BIL is currently on track to achieve its programme targets. The next financial year is expected to be the peak year for expenditure.","startDate":"2023-07-24","endDate":null,"scheduleNarrative":"The project's end-date at 24/25-Q4 is scheduled to be 31/03/2029. This is primarily due to the following factors: There are no changes to the schedule. The final completions for the programme are still planned for the end of the 2028/29 financial year.","fyBaseline":275.58,"fyForecast":242.1,"fyVariance":12.15,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ In March 2025, some BIL spend was reprofiled into the next Financial Year to allow for a key strategic acquisition, resulting in a 12% budget shortfall which will be met in Financial Year 2025/26.","wholeLifeCost":1497.79,"costNarrative":"The project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) is 1,497. This is primarily due to the following factors‚ At Spending Review 21 a package of investment was announced to drive economic growth by investing in new housing-led brownfield, infrastructure, and land projects in England, unlocking construction of 65,500 homes. Budgets profiles have recently been updated as part of the spending review process, with no change to WLC.","benefits":2957.0,"benefitsNarrative":"The project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) is 2957. This is primarily due to the following factors‚ Key monetised benefits are expected to be: increased land value uplift from residential and commercial developments, health benefits from affordable housing and distributional benefits from affordable housing. Further benefits realisation planning will be undertaken in Financial Year 25/26, providing a more accurate projection of the anticipated benefits.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER. This is due to‚ Delivery confidence remains Amber, given various risks the programme could face as it transitions into the delivery phase, including potential cost increases and impacts of the Building Safety Act (which may cause delays to project approvals…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":-1,"transition":"Improved","endDateDeltaDays":null,"attentionScore":0,"attentionReasons":[]},{"id":"DWP_0304_2324-Q3","year":2026,"name":"Connect to Work","department":"DWP","category":"Government Transformation and Service Delivery","description":"Connect to work will deliver, through grant funding to Local Authorities , a national voluntary supported employment programme focused on helping disabled people, people with health conditions and people with additional barriers to employment into sustained work. Once fully rolled out across England and Wales, Connect to work is expected to support up to 100,000 people per year to enter or remain within sustained employment. It will do this by providing locally-based employment specialists, offering intensive/ personalised support based on proven Supported Employment models – Individual Placement and Support (IPS) and Supported Employment Quality Framework (SEQF).","ipaDca":"Green","sroDca":null,"deliveryConfidence":"Green","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 increased to GREEN. This is primarily due to the following factors‚ successful delivery of the programme appears highly likely and there are no major outstanding issues that at this stage appear to threaten transition to business as usual.","startDate":null,"endDate":"2026-03-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same, 31/03/2030. This is primarily due to the following factors‚ Grant Funding Agreements that have or are due to be put in place with Accountable Bodies, this end date refers to when the service is due to end, based on current plans and assumptions.","fyBaseline":87.8,"fyForecast":89.09,"fyVariance":1.47,"varianceNarrative":"The budget variance is less than or equal to 5%","wholeLifeCost":1094.99,"costNarrative":"Compared to the financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost (measured in £m) decreased to 1094.99 for 25/26-Q4 WLC. This is primarily due to a reduction in forecast grant cost due to differences between modelled estimates and agreed local delivery plans, along with changes to optimism bias assumptions.","benefits":2566.22,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits (measured in £m) increased to 2566.22 for 25/26-Q4. This is primarily due to moving to a more accurate approach to calculating benefits.","themes":["Cost & funding","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 increased to GREEN. This is primarily due to the following factors‚ successful delivery of the programme appears highly likely and there are no major outstanding issues that at this stage appear to threaten transition to business as usual. Compared to…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"DWP_0304_2324-Q3","year":2025,"name":"Connect to Work","department":"DWP","category":"Government Transformation and Service Delivery","description":"Connect to work will deliver, through grant funding to Local Authorities , a national voluntary supported employment programme focused on helping disabled people, people with health conditions and people with additional barriers to employment into sustained work. Once fully rolled out across England and Wales, Connect to work is expected to support up to 100,000 people per year to enter or remain within sustained employment. It will do this by providing locally-based employment specialists, offering intensive/ personalised support based on proven Supported Employment models – Individual Placement and Support (IPS) and Supported Employment Quality Framework (SEQF).","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER. This is due to‚ West London Alliance was the first accountable body to start delivering Connect to Work on 28 April 2025. The majority of accountable bodies (AB's) have submitted delivery plans, all of which are currently under review by the appropriate panels. The Programme Business Case was approved by the Investment Committee on 29 April 2025, enabling progression to Treasury Approval Point which is scheduled for June 2025. Funding is secured for three years, after which further approvals will be required. Connect to Work continues to work with Job Centre Plus as more ABs begin implementation.","startDate":"2023-04-01","endDate":"2030-03-31","scheduleNarrative":"The project's end-date at 24/25-Q4 is scheduled to be 31/03/2030. This is primarily due to the following factors‚ Grant Funding Agreements that have or are due to be put in place with Accountable Bodies, this end date refers to when the service is due to end, based on current plans and assumptions.","fyBaseline":73.8,"fyForecast":68.9,"fyVariance":6.64,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ a pause in implementation due to general election.","wholeLifeCost":1373.8,"costNarrative":"The project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) is 1373. This is primarily due to the following factors‚ grant funding for local areas to deliver supported employment.","benefits":2293.7,"benefitsNarrative":"The project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) is 2293. This is primarily due to the following factors‚ AME savings and societal benefits. The benefits currently identified for the Connect to Work (CtW) programme were selected through a structured, evidence-informed process to ensure alignment with the Programme and DWP strategic intent and delivery objectives. These benefits are designed to reflect the programme’s core aim of supporting individuals with disabilities, long-term health conditions, or complex barriers into sustained employment.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER. This is due to‚ West London Alliance was the first accountable body to start delivering Connect to Work on 28 April 2025. The majority of accountable bodies (AB's) have submitted delivery plans, all of which are currently under review by the appropriate…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"DWP_0304_2324-Q3","year":2026,"name":"Connect to Work","department":"DWP","category":"Government Transformation and Service Delivery","description":"Connect to work will deliver, through grant funding to Local Authorities , a national voluntary supported employment programme focused on helping disabled people, people with health conditions and people with additional barriers to employment into sustained work. Once fully rolled out across England and Wales, Connect to work is expected to support up to 100,000 people per year to enter or remain within sustained employment. It will do this by providing locally-based employment specialists, offering intensive/ personalised support based on proven Supported Employment models – Individual Placement and Support (IPS) and Supported Employment Quality Framework (SEQF).","ipaDca":"Green","sroDca":null,"deliveryConfidence":"Green","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 increased to GREEN. This is primarily due to the following factors‚ successful delivery of the programme appears highly likely and there are no major outstanding issues that at this stage appear to threaten transition to business as usual.","startDate":null,"endDate":"2026-03-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same, 31/03/2030. This is primarily due to the following factors‚ Grant Funding Agreements that have or are due to be put in place with Accountable Bodies, this end date refers to when the service is due to end, based on current plans and assumptions.","fyBaseline":87.8,"fyForecast":89.09,"fyVariance":1.47,"varianceNarrative":"The budget variance is less than or equal to 5%","wholeLifeCost":1094.99,"costNarrative":"Compared to the financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost (measured in £m) decreased to 1094.99 for 25/26-Q4 WLC. This is primarily due to a reduction in forecast grant cost due to differences between modelled estimates and agreed local delivery plans, along with changes to optimism bias assumptions.","benefits":2566.22,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits (measured in £m) increased to 2566.22 for 25/26-Q4. This is primarily due to moving to a more accurate approach to calculating benefits.","themes":["Cost & funding","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 increased to GREEN. This is primarily due to the following factors‚ successful delivery of the programme appears highly likely and there are no major outstanding issues that at this stage appear to threaten transition to business as usual. Compared to…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"DWP_0304_2324-Q3","year":2025,"name":"Connect to Work","department":"DWP","category":"Government Transformation and Service Delivery","description":"Connect to work will deliver, through grant funding to Local Authorities , a national voluntary supported employment programme focused on helping disabled people, people with health conditions and people with additional barriers to employment into sustained work. Once fully rolled out across England and Wales, Connect to work is expected to support up to 100,000 people per year to enter or remain within sustained employment. It will do this by providing locally-based employment specialists, offering intensive/ personalised support based on proven Supported Employment models – Individual Placement and Support (IPS) and Supported Employment Quality Framework (SEQF).","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER. This is due to‚ West London Alliance was the first accountable body to start delivering Connect to Work on 28 April 2025. The majority of accountable bodies (AB's) have submitted delivery plans, all of which are currently under review by the appropriate panels. The Programme Business Case was approved by the Investment Committee on 29 April 2025, enabling progression to Treasury Approval Point which is scheduled for June 2025. Funding is secured for three years, after which further approvals will be required. Connect to Work continues to work with Job Centre Plus as more ABs begin implementation.","startDate":"2023-04-01","endDate":"2030-03-31","scheduleNarrative":"The project's end-date at 24/25-Q4 is scheduled to be 31/03/2030. This is primarily due to the following factors‚ Grant Funding Agreements that have or are due to be put in place with Accountable Bodies, this end date refers to when the service is due to end, based on current plans and assumptions.","fyBaseline":73.8,"fyForecast":68.9,"fyVariance":6.64,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ a pause in implementation due to general election.","wholeLifeCost":1373.8,"costNarrative":"The project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) is 1373. This is primarily due to the following factors‚ grant funding for local areas to deliver supported employment.","benefits":2293.7,"benefitsNarrative":"The project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) is 2293. This is primarily due to the following factors‚ AME savings and societal benefits. The benefits currently identified for the Connect to Work (CtW) programme were selected through a structured, evidence-informed process to ensure alignment with the Programme and DWP strategic intent and delivery objectives. These benefits are designed to reflect the programme’s core aim of supporting individuals with disabilities, long-term health conditions, or complex barriers into sustained employment.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER. This is due to‚ West London Alliance was the first accountable body to start delivering Connect to Work on 28 April 2025. The majority of accountable bodies (AB's) have submitted delivery plans, all of which are currently under review by the appropriate…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":-1,"transition":"Improved","endDateDeltaDays":-1461,"attentionScore":0,"attentionReasons":[]},{"id":"DFE_0272_2324-Q2","year":2026,"name":"Early Years Childcare Reform Programme","department":"DFE","category":"Government Transformation and Service Delivery","description":"The Early Years Childcare Reform Programme was launched to expand funded childcare for working parents and give children the best possible start in life, while supporting parents to enter or increase hours in work. The programme was introduced in response to rising childcare costs and the need to improve access to affordable, high‑quality early education across England. The programme significantly increased the number of funded childcare hours available, extending the 30‑hour entitlement to younger children from nine months old. This required close work with local authorities, childcare providers and the sector to ensure there were enough childcare places, a strong workforce, and reliable digital systems to support families to access their entitlements. The programme’s aim was to deliver this expansion safely and sustainably, ensuring childcare was available where families need it, that funding reached providers on time, and that the system continued to operate smoothly as demand increased. By the completion of the programme, uptake had exceeded expectations, national childcare capacity was sufficient, and the programme successfully transitioned into ongoing business‑as‑usual operations to support long‑term delivery of childcare entitlements","ipaDca":"Green","sroDca":null,"deliveryConfidence":"Green","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 2024/25 Q4, the Delivery Confidence Assessment (DCA) at 2025/26 Q4 increased to Green. This reflects strong and sustained progress across the year in delivering the expanded childcare entitlements. Early in the year, delivery confidence was cautious due to workforce and place capacity pressures in some areas. As the year progressed, uptake exceeded expectations, workforce numbers grew steadily, and local authority readiness improved significantly. By September, all local authorities were reporting sufficient childcare places, with no national shortfalls and high code‑validation rates showing demand was being met. Digital systems have operated reliably, parents have been able to access the hours they are entitled to, and no widespread complaints have been reported. The programme successfully met its final milestones and received a Green rating at its final independent assurance review, enabling a confident transition into business‑as‑usual operations","startDate":"2023-03-16","endDate":null,"scheduleNarrative":"Compared to financial year 2024/25 Q4, the project’s end‑date at 2025/26 Q4 remained the same. This is because the programme delivered all planned milestones to schedule across the year. While early delivery phases required careful management of workforce and childcare capacity in some areas, these risks were anticipated and addressed without impacting the overall timetable. The September 2025 expansion milestone was achieved on time, with strong uptake, sufficient childcare places nationally, and stable digital systems. The programme successfully completed its final delivery activities as planned, received a Green rating at its final independent assurance review, and is proceeding to formal closure and transition into business‑as‑usual operations in line with the original schedule. Alongside continued BAU delivery, management of the Programme's benefits and our Programme evaluation continue as planned, with the evaluation's final report due in late 2027.","fyBaseline":4021.7,"fyForecast":4021.7,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%","wholeLifeCost":16207.65,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) increased to £16,983 This reflects updated funding assumptions in relation to higher expected take‑up of funded hours, increased provider funding rates to reflect wage inflation, and refinements to delivery cost modelling as the programme moves to full rollout","benefits":null,"benefitsNarrative":"Compared to our return for Q4 of financial year 2024/25, the departmentally-agreed benefits at Q4 of 2025/26 reflect the most recently agreed range of benefits rather than a fixed or final estimate. The benefits figures reported at 2025/26 Q4 reflect the most recent programme level economic appraisal of the childcare reforms, covering impacts from spending over FY23/24 to FY27/28. These estimates are expressed on an economic basis, adjusted to reflect changes over time (including inflation and discounting), and are therefore not directly comparable with the financial (cash) costs of the programme, which are reported separately. The appraisal estimates monetised benefits using the best available evidence from research, administrative data and economic modelling. However, the assessment relies in part on proxy measures and therefore carries a high degree of uncertainty. The appraisal estimates £8bn of economic benefits from impacts on maternal labour market participation (employment rates, hours worked and reduced labour market detachment), maternal subjective wellbeing, and child development associated with formal childcare attendance. There is a further £8bn of economic transfer to households already using childcare that will boost their disposable income. The most recent assessment suggests that the programme delivers around £1 of monetised economic benefit for every £1 of economic cost. This reflects an updated appraisal baseline rather than a fixed or final estimate and should be interpreted as an indicative position rather than a precise measure of value for money. Small changes in underlying assumptions including uptake, labour supply responses and deadweight can have a material effect on the benefit–cost ratio, and the estimated ratio could increase or decrease as further evidence becomes available, in particular following the final phase of the rollout of the 30hours expansion from September 2025. In addition to the monetised impacts, there are important benefits that are not currently quantified, including how funding rates for 9mo-2 yo children supports provider delivery and quality, across the sector, and benefits child development and outcomes as has been recognised by successive governments . Further, the benefits of increased formal childcare use influencing the home learning environment are not captured. These omissions mean that the appraisal does not capture the full range of potential benefits to both labour market participation which is itself shaped through local childcare markets, and child development. The department recognises that the current benefit estimates are uncertain and subject to ongoing refinement. Ongoing evaluation activity, including analytical work by the Institute for Fiscal Studies, will provide further evidence on behavioural impacts, deadweight and longer-term outcomes, helping to inform future assessments of programme benefits and overall value for money.","themes":["Delivery & schedule","Cost & funding","Workforce & capability","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 2024/25 Q4, the Delivery Confidence Assessment (DCA) at 2025/26 Q4 increased to Green. This reflects strong and sustained progress across the year in delivering the expanded childcare entitlements. Early in the year, delivery confidence was cautious due to workforce and place capacity pressures in some areas. As the year…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"DFE_0272_2324-Q2","year":2024,"name":"Early Years Childcare Reform Programme","department":"DFE","category":"Government Transformation and Service Delivery","description":"The Programme comprises of four overarching projects; Families, Providers, Local Authorities and Wraparound, led by SCS SROs and supported by a dedicated Project Manager and PMO resource who collaborate with the central PMO. The aim of the programme is to increase parental employment and progression of earnings by increasing childcare access for eligible working parents. We have had the programme business case agreed and signed off by InvestCo.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. An IPA Gate 0 review in Mar 24 gave the programme an amber rating. This was broken down as green for the first stage of roll out (Apr 24), amber for Sep 24 expansion and red for the Sep 25 expansion. The review recognised the hard work of staff to achieve several challenging milestones. Relationship management with local authorities and stakeholders internally and externally was praised. There were also some clear recommendations on the resource and capability needed in key aspects of the programme including the PMO, Insights Unit and Communications. We continue the work to strengthen these areas with focus on skilled resources and refreshing the governance. Our delivery has remained on track since the first 'live' milestone in Apr 24. We have continued to progress key activities across the programme including system development, operational infrastructure, and legislation to ensure the sector is ready for the expansion.","startDate":"2023-03-16","endDate":"2028-12-01","scheduleNarrative":"The project's end-date at 23/24-Q4 is 2028-12-01. This is primarily due to the following factors. The programme end data is Dec 2028 this is primarily due to the plan to transform reforms to childcare for parents, children, the economy and women. By 2027-28, this Government will expect to be spending in excess of 8bn every year on free hours and early education, helping working families with their childcare costs. This represents the single biggest investment in childcare in England ever. The programme is on track to complete by its stated end date.","fyBaseline":342.8,"fyForecast":342.8,"fyVariance":0.0,"varianceNarrative":"The budget variance is inferior or equal to 5%.","wholeLifeCost":15135.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 23/24-Q4 is 15135m. This is primarily due to the following factors. The whole-life programme cost is 15.1bn (which extends to financial year 2027-28) including both the delivery of the expansion (565.2m) and the additional entitlement funding (14.6bn). This overall funding envelope and specific project budgets are based on a pre-announcement estimation of likely delivery costs. As the programme matures, planning and policy is developed, and individual business cases prepared, more accurate budget needs and financial year profiles will be agreed.","benefits":0.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 0m. The project's departmental-agreed monetised benefits at Q4 FY23/24 is 0m. Benefits are currently being defined.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Workforce & capability"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. An IPA Gate 0 review in Mar 24 gave the programme an amber rating. This was broken down as green for the first stage of roll out (Apr 24), amber for Sep 24 expansion and red for the Sep 25 expansion. The review…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"DFE_0272_2324-Q2","year":2025,"name":"Early Years Childcare Reform Programme","department":"DfE","category":"Government Transformation and Service Delivery","description":"The aim of the Early Years Childcare Reform Programme is to increase parental employment and progression of earnings by increasing childcare access for eligible working parents. It comprises four overarching projects: Families, Providers, Local Authorities and Wraparound.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ We successfully delivered key milestones in April 2024 and September 2024 and refocussed the programme onto the September 2025 deliverables (up to 30 hours of childcare per week for children over nine-months old, for eligible working parents). The programme continued, through FY24/25, to assess confidence for September 2025 delivery at a national and local level, and to support growth in workforce and places needed to meet parental demand. The scale of the challenge remains significant, and we will continue to deliver against a backdrop of uncertainty. As we approach September 2025 the work on the transition to business-as-usual continues at pace with the PMO directing the strategy around what this looks like.","startDate":"2023-03-16","endDate":"2028-12-01","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 01/12/2028. This is primarily due to the following factors‚ This is unchanged from last year.","fyBaseline":2200.0,"fyForecast":2200.0,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":15135.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 15135. This is primarily due to the following factors‚ This is unchanged from last year.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ This is unchanged from last year. However, the programme will deliver monetised benefits. These will be confirmed during FY2526 as evidence of demand from parents becomes available to refine estimates.","themes":["Cost & funding","Delivery & schedule","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ We successfully delivered key milestones in April 2024 and September 2024 and refocussed the programme onto the September 2025 deliverables (up to 30 hours of…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"DFE_0272_2324-Q2","year":2026,"name":"Early Years Childcare Reform Programme","department":"DFE","category":"Government Transformation and Service Delivery","description":"The Early Years Childcare Reform Programme was launched to expand funded childcare for working parents and give children the best possible start in life, while supporting parents to enter or increase hours in work. The programme was introduced in response to rising childcare costs and the need to improve access to affordable, high‑quality early education across England. The programme significantly increased the number of funded childcare hours available, extending the 30‑hour entitlement to younger children from nine months old. This required close work with local authorities, childcare providers and the sector to ensure there were enough childcare places, a strong workforce, and reliable digital systems to support families to access their entitlements. The programme’s aim was to deliver this expansion safely and sustainably, ensuring childcare was available where families need it, that funding reached providers on time, and that the system continued to operate smoothly as demand increased. By the completion of the programme, uptake had exceeded expectations, national childcare capacity was sufficient, and the programme successfully transitioned into ongoing business‑as‑usual operations to support long‑term delivery of childcare entitlements","ipaDca":"Green","sroDca":null,"deliveryConfidence":"Green","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 2024/25 Q4, the Delivery Confidence Assessment (DCA) at 2025/26 Q4 increased to Green. This reflects strong and sustained progress across the year in delivering the expanded childcare entitlements. Early in the year, delivery confidence was cautious due to workforce and place capacity pressures in some areas. As the year progressed, uptake exceeded expectations, workforce numbers grew steadily, and local authority readiness improved significantly. By September, all local authorities were reporting sufficient childcare places, with no national shortfalls and high code‑validation rates showing demand was being met. Digital systems have operated reliably, parents have been able to access the hours they are entitled to, and no widespread complaints have been reported. The programme successfully met its final milestones and received a Green rating at its final independent assurance review, enabling a confident transition into business‑as‑usual operations","startDate":"2023-03-16","endDate":null,"scheduleNarrative":"Compared to financial year 2024/25 Q4, the project’s end‑date at 2025/26 Q4 remained the same. This is because the programme delivered all planned milestones to schedule across the year. While early delivery phases required careful management of workforce and childcare capacity in some areas, these risks were anticipated and addressed without impacting the overall timetable. The September 2025 expansion milestone was achieved on time, with strong uptake, sufficient childcare places nationally, and stable digital systems. The programme successfully completed its final delivery activities as planned, received a Green rating at its final independent assurance review, and is proceeding to formal closure and transition into business‑as‑usual operations in line with the original schedule. Alongside continued BAU delivery, management of the Programme's benefits and our Programme evaluation continue as planned, with the evaluation's final report due in late 2027.","fyBaseline":4021.7,"fyForecast":4021.7,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%","wholeLifeCost":16207.65,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) increased to £16,983 This reflects updated funding assumptions in relation to higher expected take‑up of funded hours, increased provider funding rates to reflect wage inflation, and refinements to delivery cost modelling as the programme moves to full rollout","benefits":null,"benefitsNarrative":"Compared to our return for Q4 of financial year 2024/25, the departmentally-agreed benefits at Q4 of 2025/26 reflect the most recently agreed range of benefits rather than a fixed or final estimate. The benefits figures reported at 2025/26 Q4 reflect the most recent programme level economic appraisal of the childcare reforms, covering impacts from spending over FY23/24 to FY27/28. These estimates are expressed on an economic basis, adjusted to reflect changes over time (including inflation and discounting), and are therefore not directly comparable with the financial (cash) costs of the programme, which are reported separately. The appraisal estimates monetised benefits using the best available evidence from research, administrative data and economic modelling. However, the assessment relies in part on proxy measures and therefore carries a high degree of uncertainty. The appraisal estimates £8bn of economic benefits from impacts on maternal labour market participation (employment rates, hours worked and reduced labour market detachment), maternal subjective wellbeing, and child development associated with formal childcare attendance. There is a further £8bn of economic transfer to households already using childcare that will boost their disposable income. The most recent assessment suggests that the programme delivers around £1 of monetised economic benefit for every £1 of economic cost. This reflects an updated appraisal baseline rather than a fixed or final estimate and should be interpreted as an indicative position rather than a precise measure of value for money. Small changes in underlying assumptions including uptake, labour supply responses and deadweight can have a material effect on the benefit–cost ratio, and the estimated ratio could increase or decrease as further evidence becomes available, in particular following the final phase of the rollout of the 30hours expansion from September 2025. In addition to the monetised impacts, there are important benefits that are not currently quantified, including how funding rates for 9mo-2 yo children supports provider delivery and quality, across the sector, and benefits child development and outcomes as has been recognised by successive governments . Further, the benefits of increased formal childcare use influencing the home learning environment are not captured. These omissions mean that the appraisal does not capture the full range of potential benefits to both labour market participation which is itself shaped through local childcare markets, and child development. The department recognises that the current benefit estimates are uncertain and subject to ongoing refinement. Ongoing evaluation activity, including analytical work by the Institute for Fiscal Studies, will provide further evidence on behavioural impacts, deadweight and longer-term outcomes, helping to inform future assessments of programme benefits and overall value for money.","themes":["Delivery & schedule","Cost & funding","Workforce & capability","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 2024/25 Q4, the Delivery Confidence Assessment (DCA) at 2025/26 Q4 increased to Green. This reflects strong and sustained progress across the year in delivering the expanded childcare entitlements. Early in the year, delivery confidence was cautious due to workforce and place capacity pressures in some areas. As the year…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"DFE_0272_2324-Q2","year":2025,"name":"Early Years Childcare Reform Programme","department":"DfE","category":"Government Transformation and Service Delivery","description":"The aim of the Early Years Childcare Reform Programme is to increase parental employment and progression of earnings by increasing childcare access for eligible working parents. It comprises four overarching projects: Families, Providers, Local Authorities and Wraparound.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ We successfully delivered key milestones in April 2024 and September 2024 and refocussed the programme onto the September 2025 deliverables (up to 30 hours of childcare per week for children over nine-months old, for eligible working parents). The programme continued, through FY24/25, to assess confidence for September 2025 delivery at a national and local level, and to support growth in workforce and places needed to meet parental demand. The scale of the challenge remains significant, and we will continue to deliver against a backdrop of uncertainty. As we approach September 2025 the work on the transition to business-as-usual continues at pace with the PMO directing the strategy around what this looks like.","startDate":"2023-03-16","endDate":"2028-12-01","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 01/12/2028. This is primarily due to the following factors‚ This is unchanged from last year.","fyBaseline":2200.0,"fyForecast":2200.0,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":15135.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 15135. This is primarily due to the following factors‚ This is unchanged from last year.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ This is unchanged from last year. However, the programme will deliver monetised benefits. These will be confirmed during FY2526 as evidence of demand from parents becomes available to refine estimates.","themes":["Cost & funding","Delivery & schedule","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ We successfully delivered key milestones in April 2024 and September 2024 and refocussed the programme onto the September 2025 deliverables (up to 30 hours of…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":-1,"transition":"Improved","endDateDeltaDays":null,"attentionScore":0,"attentionReasons":[]},{"id":"DHSC_0252_2324-Q1","year":2026,"name":"FEDERATED DATA PLATFORM","department":"DHSC","category":"Government Transformation and Service Delivery","description":"The NHS Federated Data Platform (FDP) is a national initiative aimed at enhancing the use of data across the NHS to support safer, more efficient care. By securely connecting disparate NHS data systems, the FDP facilitates streamlined access and utilisation of information, reducing delays and minimising duplication.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Following the Green rating received in Q4 of the financial year 24/25, the NISTA/SRO Delivery Confidence Assessment (DCA) for Q4 of 25/26 has similarly achieved a Green status. The programme’s has successfully attained its targets, benefits realisation is accelerating, with ten products now generally available and regional teams onboarding new sites. Preparations for the reporting tool deployment are progressing ahead of plan, and the development of partner standards is advancing robustly. The programme has made significant strides towards achieving 2025/26 milestones. Enhanced roles, comprehensive oversight, and proactive risk management have elevated governance standards. By April 2026, 129 acute trusts were actively utilising FDP products, with demand continuing to rise.","startDate":"2022-04-01","endDate":"2032-03-31","scheduleNarrative":"The programme is still progressing as planned and is expected to meet the deadlines established in its business case.","fyBaseline":126.0,"fyForecast":126.89,"fyVariance":0.71,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":1084.31,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 has Increased. This increase reflects the increased delivery at scale, particularly in FYs 2025/26 and 2026/27. For 2025/26 the increased expenditure was financially managed and absorbed within overall budgets. For 2026/27 the accelerated delivery schedule has been accommodated within the overall budget envelope. Despite this increase, the Programme remains within the departmental baseline.","benefits":808.28,"benefitsNarrative":"Compared to financial year 2024/25 Q4, the programme's departmentally agreed Forecast benefits at 2025/26 Q4 decreased . This is primarily due to ongoing refinements to estimates reflecting updates to the product roadmap and rollout plans, alongside the adoption of a more developed forecasting approach based on improved data, more detailed delivery assumptions, and a stronger understanding of product performance, usage, and adoption. We expect programme lifetime benefits to continue to grow as more products and platform services are developed, rolled out, and adopted, and as their benefits are realised across the system.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Approvals & decisions"],"evidenceExcerpt":"Following the Green rating received in Q4 of the financial year 24/25, the NISTA/SRO Delivery Confidence Assessment (DCA) for Q4 of 25/26 has similarly achieved a Green status. The programme’s has successfully attained its targets, benefits realisation is accelerating, with ten products now generally available and regional teams onboarding new sites.…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"DHSC_0252_2324-Q1","year":2024,"name":"Federated Data Platform","department":"DHSC","category":"Government Transformation and Service Delivery","description":"The NHS Federated Data Platform (FDP) is software that will sit across NHS trusts and integrated care systems enabling NHS organisations to bring together operational data - currently stored in separate systems - to support staff to access the information they need in one safe and secure environment.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. NHS England is pleased with progress made to date with the Federated Data Platform Programme. To date, the programme has been delivered to time and within budget. We look forward to the benefits that will be realised for patients through adoption of the platform over the coming years, and believe that work to date has provided solid foundation for the programme. _x000D_ _x000D_ The benefits delivered through the pilot programmes are significant and demonstrate the true potential of the FDP and the impact that this technology will have for patients and NHS staff.","startDate":"2022-04-01","endDate":"2032-03-31","scheduleNarrative":"The project's end-date at 23/24-Q4 is 2032-03-31. This is primarily due to the following factors. The FDP Programme is currently delivering to plan. _x000D_ A full business case was approved in November 2023. _x000D_ The Federated Data Platform and Associated Services (FDP-AS) contract was awarded 22 November. The Privacy Enhancing Technology (PET) contract was awarded on 22 November. The first users were onboarded to the platform on 21 March for two National products. The programme is focused on preparations for local organisations to join the FDP, and transition of further products.","fyBaseline":122.3,"fyForecast":100.9,"fyVariance":-17.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The FDP programme receieved FBC approval in November 2023, therefore anticipated 2023/24 costs and benefits were reduced. The Variance is due tounderspend on both programme team and operational costs resulting from delayed FBC approval resulting in a delay to programme delivery plans and associated contractual costs.","wholeLifeCost":1042.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 23/24-Q4 is 1042m. This is primarily due to the following factors. The OBC recommended to procure a central Software as a Service (SaaS) platform with ICS linkages. The whole life budget includes licences and cloud costs for the software and support. Costs for internal staffing to reflect work that would be undertaken in developing and deploying the platform, its use case implementation, and delivery that would happen at greater pace. The Federated Data Platform will dock into existing ICS infrastructure where possible, according to the different integration patterns (which are based on system maturity and capability).","benefits":777.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 777m. The benefits figure outlined is an economic estimate of the total benefits the FDP programme will achieve over the life time of the project; these are cash and non-cash releasing to the NHS as well as wider societal benefits. The FDP programme will for example deliver the following benefits:_x000D_ . An increase in the utilisation of operating theatres, meaning more procedures can be carried out each year and patients should have a shorter waiting time for their procedures_x000D_ . A reduction in unnecessary delay days for patients awaiting discharge from hospital_x000D_ . A reduction in the costs of reporting and IT for Trusts and ICSs","themes":["Cost & funding","Delivery & schedule","Technical & integration","Approvals & decisions"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. NHS England is pleased with progress made to date with the Federated Data Platform Programme. To date, the programme has been delivered to time and within budget. We look forward to the benefits that will be…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"DHSC_0252_2324-Q1","year":2025,"name":"FEDERATED DATA PLATFORM","department":"DHSC","category":"Government Transformation and Service Delivery","description":"The NHS Federated Data Platform (FDP) is a national programme designed to improve how the NHS uses data to deliver better, safer, and more efficient care. Currently, NHS data is stored in many different systems that don’t easily connect, which can lead to delays, duplication, and extra work for staff. The FDP is a secure digital platform that links these systems together, allowing data to be accessed and used more effectively.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors‚ Strengthened Programme Governance: Clearer roles, responsibilities, and decision-making structures have been established, improving oversight and accountability across delivery partners; - Matured Delivery Planning: The programme now has a well-defined roadmap with realistic timelines, phased implementation, and prioritised use cases aligned to NHS strategic goals; - Achievement of Programme Delivery targets: As of 31 March 2025, the programme had 72 acute trusts live with at least one product delivering benefits platform, comfortably meeting the year end target. The programme continues to generate demand and is above target for 2025/26 demand; and - Alignment with National Priorities: the programme is closely aligned with key NHS and government strategies, which has helped secure continued support and investment.","startDate":"2022-04-01","endDate":"2032-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2032. This is primarily due to the following factors‚ The programme remains on track to deliver to the timeframes set out in it’s business case.","fyBaseline":122.0,"fyForecast":101.0,"fyVariance":17.21,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ There has been an in-year variance of in excess of 5% due to a lower number of products being taken by Trusts, than was planned in the budget, A range of operational and contextual factors contributed to this outcome. Work is ongoing to review engagement approaches and identify opportunities to support improved uptake and delivery in future periods.","wholeLifeCost":1042.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 1042. This is primarily due to the following factors‚ The underspend in 2024/25 does not require a change in the project’s agreed Whole Life Cost of £1042m. This position reflects the expectation that current variances are timing-related rather than indicative of a fundamental shift in overall cost requirements. The project remains on track to deliver its intended outcomes within the approved financial envelope, and ongoing monitoring will ensure that any future adjustments are identified and managed appropriately.","benefits":777.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 777. This is primarily due to the following factors‚ The FDP is driving an innovating, benefits led approach to delivery. Benefits are reported regularly and transparently – being published on the NHS website on a dedicated Uptake and Benefits page. The FDP is delivering significant, measurable benefits, with rapid uptake. The outcomes align strongly with the business case and forecast lifetime benefits exceed the departmental baseline.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors‚ Strengthened Programme Governance: Clearer roles, responsibilities, and decision-making structures have been established, improving oversight and…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"DHSC_0252_2324-Q1","year":2026,"name":"FEDERATED DATA PLATFORM","department":"DHSC","category":"Government Transformation and Service Delivery","description":"The NHS Federated Data Platform (FDP) is a national initiative aimed at enhancing the use of data across the NHS to support safer, more efficient care. By securely connecting disparate NHS data systems, the FDP facilitates streamlined access and utilisation of information, reducing delays and minimising duplication.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Following the Green rating received in Q4 of the financial year 24/25, the NISTA/SRO Delivery Confidence Assessment (DCA) for Q4 of 25/26 has similarly achieved a Green status. The programme’s has successfully attained its targets, benefits realisation is accelerating, with ten products now generally available and regional teams onboarding new sites. Preparations for the reporting tool deployment are progressing ahead of plan, and the development of partner standards is advancing robustly. The programme has made significant strides towards achieving 2025/26 milestones. Enhanced roles, comprehensive oversight, and proactive risk management have elevated governance standards. By April 2026, 129 acute trusts were actively utilising FDP products, with demand continuing to rise.","startDate":"2022-04-01","endDate":"2032-03-31","scheduleNarrative":"The programme is still progressing as planned and is expected to meet the deadlines established in its business case.","fyBaseline":126.0,"fyForecast":126.89,"fyVariance":0.71,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":1084.31,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 has Increased. This increase reflects the increased delivery at scale, particularly in FYs 2025/26 and 2026/27. For 2025/26 the increased expenditure was financially managed and absorbed within overall budgets. For 2026/27 the accelerated delivery schedule has been accommodated within the overall budget envelope. Despite this increase, the Programme remains within the departmental baseline.","benefits":808.28,"benefitsNarrative":"Compared to financial year 2024/25 Q4, the programme's departmentally agreed Forecast benefits at 2025/26 Q4 decreased . This is primarily due to ongoing refinements to estimates reflecting updates to the product roadmap and rollout plans, alongside the adoption of a more developed forecasting approach based on improved data, more detailed delivery assumptions, and a stronger understanding of product performance, usage, and adoption. We expect programme lifetime benefits to continue to grow as more products and platform services are developed, rolled out, and adopted, and as their benefits are realised across the system.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Approvals & decisions"],"evidenceExcerpt":"Following the Green rating received in Q4 of the financial year 24/25, the NISTA/SRO Delivery Confidence Assessment (DCA) for Q4 of 25/26 has similarly achieved a Green status. The programme’s has successfully attained its targets, benefits realisation is accelerating, with ten products now generally available and regional teams onboarding new sites.…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"DHSC_0252_2324-Q1","year":2025,"name":"FEDERATED DATA PLATFORM","department":"DHSC","category":"Government Transformation and Service Delivery","description":"The NHS Federated Data Platform (FDP) is a national programme designed to improve how the NHS uses data to deliver better, safer, and more efficient care. Currently, NHS data is stored in many different systems that don’t easily connect, which can lead to delays, duplication, and extra work for staff. The FDP is a secure digital platform that links these systems together, allowing data to be accessed and used more effectively.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors‚ Strengthened Programme Governance: Clearer roles, responsibilities, and decision-making structures have been established, improving oversight and accountability across delivery partners; - Matured Delivery Planning: The programme now has a well-defined roadmap with realistic timelines, phased implementation, and prioritised use cases aligned to NHS strategic goals; - Achievement of Programme Delivery targets: As of 31 March 2025, the programme had 72 acute trusts live with at least one product delivering benefits platform, comfortably meeting the year end target. The programme continues to generate demand and is above target for 2025/26 demand; and - Alignment with National Priorities: the programme is closely aligned with key NHS and government strategies, which has helped secure continued support and investment.","startDate":"2022-04-01","endDate":"2032-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2032. This is primarily due to the following factors‚ The programme remains on track to deliver to the timeframes set out in it’s business case.","fyBaseline":122.0,"fyForecast":101.0,"fyVariance":17.21,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ There has been an in-year variance of in excess of 5% due to a lower number of products being taken by Trusts, than was planned in the budget, A range of operational and contextual factors contributed to this outcome. Work is ongoing to review engagement approaches and identify opportunities to support improved uptake and delivery in future periods.","wholeLifeCost":1042.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 1042. This is primarily due to the following factors‚ The underspend in 2024/25 does not require a change in the project’s agreed Whole Life Cost of £1042m. This position reflects the expectation that current variances are timing-related rather than indicative of a fundamental shift in overall cost requirements. The project remains on track to deliver its intended outcomes within the approved financial envelope, and ongoing monitoring will ensure that any future adjustments are identified and managed appropriately.","benefits":777.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 777. This is primarily due to the following factors‚ The FDP is driving an innovating, benefits led approach to delivery. Benefits are reported regularly and transparently – being published on the NHS website on a dedicated Uptake and Benefits page. The FDP is delivering significant, measurable benefits, with rapid uptake. The outcomes align strongly with the business case and forecast lifetime benefits exceed the departmental baseline.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors‚ Strengthened Programme Governance: Clearer roles, responsibilities, and decision-making structures have been established, improving oversight and…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":0,"attentionScore":0,"attentionReasons":[]},{"id":"DEFRA_0236_2324-Q1","year":2026,"name":"FLOOD AND COASTAL EROSION RISK MANAGEMENT","department":"DEFRA","category":"Infrastructure and Construction","description":"From 1 April 2021, Defra announced a new £5.2bn 6-year investment programme for flood & coastal erosion risk management- investing in 2,000 flood defence schemes to better protect 336,000 properties by 2027. Due to the impact of the covid 19 pandemic and a significant spike in inflation this was revised down to 200,000. The new government reduced to a 5 year programme to introduce new funding policy sooner which equated to 140,272 over 5 years with a particular focus on a £4.2bn 2 year programme with a target of 52,000.","ipaDca":"Green","sroDca":null,"deliveryConfidence":"Green","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained amber. This is primarily due to concerns around work being conducted to manage the transition from the current programme to the next programme commencing on 1 April 2026","startDate":"2020-04-01","endDate":"2026-03-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same","fyBaseline":1075.16,"fyForecast":1055.79,"fyVariance":1.8,"varianceNarrative":"The budget variance is less than or equal to 5%.\"","wholeLifeCost":4835.25,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) remained at 4,613.000m","benefits":12042.59,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 21,888.000m","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained amber. This is primarily due to concerns around work being conducted to manage the transition from the current programme to the next programme commencing on 1 April 2026 Compared to financial year 24/25-Q4, the project's…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"DEFRA_0236_2324-Q1","year":2024,"name":"Flood and Coastal Erosion Risk Management 6-year Capital Programme","department":"DEFRA","category":"Infrastructure and Construction","description":"A comprehensive flood and coastal resilience investment programme to upgrade and revitalise England's flood defence infrastructure. The programme aims to reduce the harm and damage caused by flooding, protect peoples' lives and minimise disruption to livelihoods. This is a strategic programme comprising several thousand individual flood and coastal defence projects delivered by the Environment Agency and other Risk Management Authorities.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. The investment programme had a challenging start arising from the combined impact of COVID-19, a shortage of skills in the infrastructure sector, and higher than forecast inflation and increased material costs. As a result, the Environment Agency and Defra have produced a revised business case and spending profile that takes into account these impacts, while still maintaining focus on better protecting properties from flooding and coastal erosion. The amber rating reflects ongoing risks associated with: securing partnership funding from other public and private organisations; reliance on other risk management authorities to deliver 40% of the programme; and the impact of revised accounting rules that require approval from HM Treasury to reclassify a portion of existing CDEL funding as RDEL. The Environment Agency has been improving other risk management authority access to its frameworks; simplifying business cases and assurance; and improving access to information and training and guidance.","startDate":"2020-04-01","endDate":"2027-03-31","scheduleNarrative":"The project's end-date at 23/24-Q4 is 2027-03-31. This is primarily due to the following factors. Defra and HM Treasury have agreed a 6-year funding settlement for the Flood and Coastal Erosion Risk Management Investment Programme between April 2021 to March 2027.","fyBaseline":854.0,"fyForecast":854.0,"fyVariance":0.0,"varianceNarrative":"The budget variance is inferior or equal to 5%.","wholeLifeCost":5664.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 23/24-Q4 is 5664m. This is primarily due to the following factors. The programme has been impacted by capacity and capability issues and increased cost of delivery, primarily through high levels of inflation. This slowed down delivery resulting in lower expenditure than originally planned in the early years of the programme. A revised programme business case has been agreed with Defra with a revised spending profile, but this does not alter the total funding allocation to the programme.","benefits":37292.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 37292m. Benefits of flood and coastal risk management projects are based on the reducing the damages caused by flooding and erosion. They are informed by physical models of flood and erosion risks that assess impacts under a range of scenarios, factoring in climate change. The monetised values are based on data on the economic costs of flooding.","themes":["Cost & funding","Workforce & capability","Approvals & decisions","Delivery & schedule"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. The investment programme had a challenging start arising from the combined impact of COVID-19, a shortage of skills in the infrastructure sector, and higher than forecast inflation and increased material costs.…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"DEFRA_0236_2324-Q1","year":2025,"name":"FLOOD AND COASTAL EROSION RISK MANAGEMENT","department":"DEFRA","category":"Infrastructure and Construction","description":"A comprehensive flood and coastal resilience investment programme to upgrade and revitalise England's flood defence infrastructure. The programme aims to reduce the harm and damage caused by flooding, protect peoples’ lives and minimise disruption to livelihoods. This is a strategic programme comprising several thousand individual flood and coastal defence projects delivered by the Environment Agency and other Risk Management Authorities.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The challenge of managing and resourcing the transition from the current programme to the next programme commencing on 1 April 2026, including changes to: funding policy, how pipeline projects are identified, and organisational design to deliver the next programme. The Environment Agency and Defra are progressing actions to meet this challenge. However, for the current programme, the Defra Secretary of State has agreed a two-year (2024/25 & 2025/26) target of 52,000 properties better protected, which equates to 140,272 by the end of the now 5 year programme. Delivery confidence assessments for 2025/26 show that the programme is currently on track to achieve this target by 31 March 2026 and this assessment was supported by an Infrastructure Project Authority review in January 2025.","startDate":"2020-04-01","endDate":"2026-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 decreased from 31/03/2027 to 31/03/2026. This is primarily due to the following factors‚ Minister Hardy has announced the next programme will begin a year early on 1 April 2026, with the current programme therefore becoming 5 years and ending on 31 March 2026.","fyBaseline":1022.0,"fyForecast":1022.0,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%. N/A - no variance","wholeLifeCost":4613.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 5664 to 4613. This is primarily due to the following factors‚ to reflect the programme end date being brought forward to March 2026.","benefits":21888.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) decreased from 37292 to 21888. This is primarily due to the following factors‚ to reflect the programme end date being brought forward to March 2026.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The challenge of managing and resourcing the transition from the current programme to the next programme commencing on 1 April 2026, including changes to: funding…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"DEFRA_0236_2324-Q1","year":2026,"name":"FLOOD AND COASTAL EROSION RISK MANAGEMENT","department":"DEFRA","category":"Infrastructure and Construction","description":"From 1 April 2021, Defra announced a new £5.2bn 6-year investment programme for flood & coastal erosion risk management- investing in 2,000 flood defence schemes to better protect 336,000 properties by 2027. Due to the impact of the covid 19 pandemic and a significant spike in inflation this was revised down to 200,000. The new government reduced to a 5 year programme to introduce new funding policy sooner which equated to 140,272 over 5 years with a particular focus on a £4.2bn 2 year programme with a target of 52,000.","ipaDca":"Green","sroDca":null,"deliveryConfidence":"Green","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained amber. This is primarily due to concerns around work being conducted to manage the transition from the current programme to the next programme commencing on 1 April 2026","startDate":"2020-04-01","endDate":"2026-03-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same","fyBaseline":1075.16,"fyForecast":1055.79,"fyVariance":1.8,"varianceNarrative":"The budget variance is less than or equal to 5%.\"","wholeLifeCost":4835.25,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) remained at 4,613.000m","benefits":12042.59,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 21,888.000m","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained amber. This is primarily due to concerns around work being conducted to manage the transition from the current programme to the next programme commencing on 1 April 2026 Compared to financial year 24/25-Q4, the project's…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"DEFRA_0236_2324-Q1","year":2025,"name":"FLOOD AND COASTAL EROSION RISK MANAGEMENT","department":"DEFRA","category":"Infrastructure and Construction","description":"A comprehensive flood and coastal resilience investment programme to upgrade and revitalise England's flood defence infrastructure. The programme aims to reduce the harm and damage caused by flooding, protect peoples’ lives and minimise disruption to livelihoods. This is a strategic programme comprising several thousand individual flood and coastal defence projects delivered by the Environment Agency and other Risk Management Authorities.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The challenge of managing and resourcing the transition from the current programme to the next programme commencing on 1 April 2026, including changes to: funding policy, how pipeline projects are identified, and organisational design to deliver the next programme. The Environment Agency and Defra are progressing actions to meet this challenge. However, for the current programme, the Defra Secretary of State has agreed a two-year (2024/25 & 2025/26) target of 52,000 properties better protected, which equates to 140,272 by the end of the now 5 year programme. Delivery confidence assessments for 2025/26 show that the programme is currently on track to achieve this target by 31 March 2026 and this assessment was supported by an Infrastructure Project Authority review in January 2025.","startDate":"2020-04-01","endDate":"2026-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 decreased from 31/03/2027 to 31/03/2026. This is primarily due to the following factors‚ Minister Hardy has announced the next programme will begin a year early on 1 April 2026, with the current programme therefore becoming 5 years and ending on 31 March 2026.","fyBaseline":1022.0,"fyForecast":1022.0,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%. N/A - no variance","wholeLifeCost":4613.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 5664 to 4613. This is primarily due to the following factors‚ to reflect the programme end date being brought forward to March 2026.","benefits":21888.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) decreased from 37292 to 21888. This is primarily due to the following factors‚ to reflect the programme end date being brought forward to March 2026.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The challenge of managing and resourcing the transition from the current programme to the next programme commencing on 1 April 2026, including changes to: funding…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":-1,"transition":"Improved","endDateDeltaDays":0,"attentionScore":0,"attentionReasons":[]},{"id":"HO_0045_2122-Q1","year":2026,"name":"FRAUD AND CYBER CRIME REPORTING AND ANALYSIS SERVICE","department":"HO","category":"Government Transformation and Service Delivery","description":"The Fraud and Cyber Crime Reporting and Analysis Service (FCCRAS) Programme is a Home Office sponsored reform programme delivered in partnership with law enforcement, government agencies and the private sector. It aims to provide an accessible and effective service for individuals and organisations to report fraud and cyber crime, improving the flow of information and intelligence to support disruption of criminal activity and better protection of the public and businesses. The programme leverages enhanced technology and intelligence-led data analysis to strengthen the national response to fraud and cyber crime, supporting more effective identification, prevention and enforcement activity. The strategic objectives of FCCRAS are improve victim experience and satisfaction, support better criminal justice outcomes, prevent crime and reduce harm, enhance understanding of the threat from serious and organised crime, improve systems interoperability and alignment with wider national programmes.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"GREEN","startDate":"2020-09-01","endDate":null,"scheduleNarrative":"Compared with Q4 2024/25, the project’s end date at Q4 2025/26 has extended from March 2026 to June 2026. This reflects the time required to complete final assurance activity and support a smooth transition to business as usual operations. The subsequent Gateway 5 assurance review, conducted in April 2026, provided a Delivery Confidence Assessment of Green, confirming that the programme is well positioned to proceed to closure. Following confirmation of the Gateway 5 timetable, and to allow sufficient time to address remaining assurance recommendations and complete a comprehensive operational handover, the programme closure date has been revised by three months. The programme is now focused on finalising closure activities and transitioning fully to business‑as‑usual delivery. There is no impact to the approved financial or economic cases. FCCRAS is attending InvestCo for formal closure in June 2026.","fyBaseline":28.77,"fyForecast":28.77,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":169.06,"costNarrative":"Compared to financial year Q4 2024/25, the project's departmentally agreed Whole Cost at Q4 2025/26 has decreased from £182m to £175.3m. This is due to the following factors following the decision to (a) adopt a phased go-live approach to release the service in stages, and (b) progress with a mitigation option to complete the Lot 1 component of programme delivery, the whole life cost of the programme was refined to reflect the actual cost of build and run, and no longer includes optimism bias.","benefits":384.71,"benefitsNarrative":"Compared to financial year Q4 2024/25, the project's departmentally agreed Benefits at Q4 2025/26 remained at £402m. This is primarily due to the following factors benefits remain the same and have been reviewed following revision to the Full Business Case presented to InvestCo in June 2025. The Programme will be closing subject to InvestCo approval in June 2026.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Approvals & decisions"],"evidenceExcerpt":"GREEN Compared with Q4 2024/25, the project’s end date at Q4 2025/26 has extended from March 2026 to June 2026. This reflects the time required to complete final assurance activity and support a smooth transition to business as usual operations. The subsequent Gateway 5 assurance review, conducted in April 2026, provided a Delivery Confidence Assessment of…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"HO_0045_2122-Q1","year":2022,"name":"Fraud And Cyber Crime Reporting and Analysis Service","department":"HO","category":"Government Transformation and Service Delivery","description":"The Fraud & Cyber Crime Reporting & Analysis service programme will implement a victim centric transformational change improving the victim reporting experience by collecting the right data first time and exploiting technology to quickly and efficiently process it. The new website, together with improved information and better navigation, will allow for a significantly enhanced self-service experience, providing information and education to prevent vulnerable people from becoming repeat victims.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Senior Responsible Owner Delivery Confidence Assessment rating at 21/22-Q4 is Amber. The FCCRAS programme has 2 phases. Phase 1 (new website and online reporting tool) is planned to go live end 2022. Phase 2 is currently in the Procurement ITN (invitation to negotiate) phase for 3 contracts with 11 suppliers. Outline solutions are under evaluation. The next phase starts May 2022 working solutions/approaches. Preparation underway to ensure we best inform suppliers so that they can provide their best proposition to us by end 2022. Resourcing reviews underway to inform roles required prior to the development of the Full Business Case and the Target Operating Model for the new service design in 2024. IPA recommendations completed apart from : - The Outline Business Case Management Case is reviewed to ensure when drafting the Full Business Case such aforementioned management areas are addressed. Inability to accurately track and hold the programme to account Essential - by Full Business Case. Status : This is work in Progress and will be addressed in the Full Business Case which is not due for completion until end 2022 - Consideration is given to establishing a wider stakeholder group to provide assurance and communication channels Status : stakeholder matrix has been created and associated communications plan is in place and being actioned.","startDate":"2020-09-01","endDate":"2024-08-31","scheduleNarrative":"Your project end-date is 31 AUG 2024. This is primarily due to the following factors: Procurement activity continues throughout 2022 resulting in preferred supplier selection in the final quarter of 2022, Full Business Case approvals and contract award 2nd quarter 2023. Suppliers to start discovery May 2023, go live 2Q24 and sufficient warranty period to take up to Aug 2024. Opportunities to pull dates in will be explored with successful suppliers and work is underway to reduce discovery time and activities required. This will facilitate a more efficient development plan.","fyBaseline":27.34,"fyForecast":27.34,"fyVariance":0.0,"varianceNarrative":"The GMPP project did not provide data","wholeLifeCost":226.0,"costNarrative":"Your projects Baseline Whole Life Cost is 226.34 (£m). This is primarily due to the following factors: In the Outline Business Case (March 2021), budgets were prepared up to the financial year 2028/29. Revenue costs over the lifetime of the project (starting from 2021/22) were £182.2m, and capital costs £32.1m In the revised Outline Business Case (Sept 21), delays to the Procurement phase of the project (and ongoing Legacy costs with IBM) set budgeting back a year, to 2029/30. Revenue costs budgeted to be £193m with a shortfall of £13m funding. Capital costs have been increased to £33m.","benefits":null,"benefitsNarrative":"","themes":["Approvals & decisions","Commercial & supply chain","Cost & funding","Delivery & schedule"],"evidenceExcerpt":"The Senior Responsible Owner Delivery Confidence Assessment rating at 21/22-Q4 is Amber. The FCCRAS programme has 2 phases. Phase 1 (new website and online reporting tool) is planned to go live end 2022. Phase 2 is currently in the Procurement ITN (invitation to negotiate) phase for 3 contracts with 11 suppliers. Outline solutions are under evaluation. The…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22"},{"id":"HO_0045_2122-Q1","year":2023,"name":"Fraud And Cyber Crime Reporting and Analysis Service","department":"HO","category":"Government Transformation and Service Delivery","description":"The Fraud and Cyber Crime Reporting and Analysis Service (FCCRAS) is a 150m transformation programme that will replace the existing system and services for reporting and analysis of fraud and cybercrime through Action Fraud and NFIB (National Fraud Intelligence Bureau). Action Fraud and NFIB are run through the City of London Police(CoLP) and are national services because fraud and cybercrime span beyond geographical boundaries and so localforce responses are ill-suited to tackle these crimes. These services are jointly funded by the Home Office (majority funder) and the City of London Corporation. The objectivesGovernment haveidentifiedfor the programme to deliver are: improved victim experience and satisfaction, lead to better criminal justice outcomes, prevent crime and reduce harm, contribute to an improved understanding of the threat from serious and organised crime and improve systems inter-operability and align with national programmes.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber (SRO rating). This is primarily due to the following factors. The IPA assessment and recommendations were welcomed. As Senior Responsible Officer, I recognise the recommendation for ensuring there is a clear and agreed plan with suppliers to develop and deliver a minimal viable product and transition to the new service and this process is under way. This process will give greater confidence of success in our go-live date for the new service in March 2024. We also welcome the recommendation for a continued emphasis on recruiting and retaining the team to deliver, including the continued visibility of any issues with the FCCRAS Programme Board, and have a dedicated workstream to ensure our capacity to delivery is maintained and grown.","startDate":"2020-09-01","endDate":"2024-08-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2024-08-31. This is primarily due to the following factors. The replacement of the existing system continues to be planned for Go Live in March 1 2024. All preferred suppliers have now been selected, and the Full Business Case, that will enable contracts to be signed ahead of the Discovery phase of the programme, passed its final approval stage for 31 March 2023.","fyBaseline":29.27,"fyForecast":29.27,"fyVariance":0.0,"varianceNarrative":"Not required as variance is less than 5%","wholeLifeCost":224.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 decreased from 226m. to 224m. This is primarily due to the following factors. In the September 2021 Outline Business Case (OBC) the whole life revenue costs were budgeted to be 193m (with a shortfall of 13m for current supplier legacy costs) and whole life capital costs to be 33m. Revised whole life revenue costs and whole life capital costs based on the Full Business Case, that was approved on 31 March 2023, will be included for the 2023/24 GMPP returns.","benefits":402.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 402m. The project's departmental-agree monetised benefits at 22/23-Q4 is 402m. On 31 March 2023, the Full Business Case (FBC) was approved. The FBC has revised the baseline benefits net present value (NPV) of 340.2million. This revised benefits assessment still remains strong and includes several non monetised benefits that have not been captured in the cost-benefit analysis. These benefits includes functionality to protect more businesses and people through giving targeted, timely advice on how to avoid the latest threats, and increased ability to block and disrupt crime through providing real time information to institutions and organisations who can take down the fraudulent sites, activities and bank accounts we know are enabling criminal activity.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber (SRO rating). This is primarily due to the following factors. The IPA assessment and recommendations were welcomed. As Senior Responsible Officer, I recognise the recommendation for ensuring there is a clear and agreed plan with suppliers to develop…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"HO_0045_2122-Q1","year":2024,"name":"Fraud And Cyber Crime Reporting and Analysis Service","department":"HO","category":"Government Transformation and Service Delivery","description":"The Fraud and Cyber Crime Reporting and Analysis Service (FCCRAS) is a 150m transformation programme that will replace the existing system and services for reporting and analysis of Fraud and Cyber Crime through Action Fraud and NFIB (National Fraud Intelligence Bureau). Action Fraud and NFIB are run through the City of London Police (CoLP) and are national services because fraud and cybercrime span beyond geographical boundaries and so local force responses are ill-suited to tackle these crimes. These services are jointly funded by the Home Office (majority funder) and the City of London Corporation. The objectives Government have identified for the programme to deliver are improved victim experience and satisfaction, lead to better criminal justice outcomes, prevent crime and reduce harm, contribute to an improved understanding of the threat from serious and organised crime and improve systems interoperability and align with national programmes","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 22/23-Q4, Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 increased from Amber to Red. This is primarily due to the following factors. The IPA are scheduled to carry out a Gate 0 review on 04 June 2024","startDate":"2020-09-01","endDate":"2024-08-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2024-08-31. This is primarily due to the following factors. The project end-date is now scheduled for 31-March 2025, due to a shift right in the delivery of the new service to November 2024. This is primarily due to the Lot 1 supplier (Capita) not delivery against the original baseline plan. There are remaining conditions outstanding on Capita to deliver as part of their rectified plan, and a task and finish group has been established to ensure completion of these, which will enable the programme to have an approved E2E DIP and definitive Go Live date.","fyBaseline":24.17,"fyForecast":18.9,"fyVariance":-22.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The financial case has been remodelled to factor in the change in delivery dates, and incorporating in external factors to the budget, such as inflation and more in depth understanding of the requirements of being an intelligent client. _x000D_ _x000D_ The financial case is due to be presented at InvestCo on 01 May 2024","wholeLifeCost":152.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 decreased from 224m. to 152m. This is primarily due to the following factors. The financial case has been remodelled to factor in the change in delivery dates, and incorporating in external factors to the budget, such as inflation and more in depth understanding of the requirements of being an intelligent client. The Whole Life Cost of the programme has increased by 7.8m_x000D_ _x000D_ The financial case is due to be presented at InvestCo on 01 May 2024","benefits":402.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 402m. On 31 March 2023, the Full Business Case (FBC) was approved. The FBC has revised the baseline benefits net present value (NPV) of 340.2million. This revised benefits assessment still remains strong and includes several non monetised benefits that have not been captured in the cost-benefit analysis. These benefits includes functionality to protect more businesses and people through giving targeted, timely advice on how to avoid the latest threats, and increased ability to block and disrupt crime through providing real time information to institutions and organisations who can take down the fraudulent sites, activities and bank accounts we know are enabling criminal activity.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 increased from Amber to Red. This is primarily due to the following factors. The IPA are scheduled to carry out a Gate 0 review on 04 June 2024 Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"HO_0045_2122-Q1","year":2025,"name":"FRAUD AND CYBER CRIME REPORTING AND ANALYSIS SERVICE","department":"HO","category":"Government Transformation and Service Delivery","description":"The Fraud and Cyber Crime Reporting and Analysis Service (FCCRAS) Programme is implementing a transformational change. Working with law enforcement, government agencies and the private sector, the programme strives to create an accessible service for all to report fraud and cybercrime. It will use enhanced technology, intelligence-led data analysis to disrupt the national rise in fraud and cyber-crime, help protect businesses and the public from deception and bring more criminals to justice.​ The new service aims to: • Make it easy for everyone to report fraud and cyber crime, taking the burden out of reporting and speeding up the time it takes to report • Significantly improve the speed and quality of information provided to law enforcement partners, boosting their chances of successful prosecution • Let victims know what’s happened with their report, including when reporting has aided others to be protected • Protect more businesses and people from fraud and cyber crime through giving targeted, timely advice on how to avoid the latest threats • Block and disrupt crime through providing real time information to institutions and organisations who can take down the fraudulent sites, activities and bank accounts we know are enabling criminal activity • Get ‘upstream’ of the problem by preventing criminals accessing enabling facilities such as bank accounts.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at RED. This is primarily due to the following factors‚ The programme has remained as reporting RED throughout 24/25 due to a delay in the full-service go live (expected to be November 2024). Following consultation with critical stakeholders and legal, the City of London Police paused the Lot 1 delivery aspect of the programme, to review next steps in detail. This activity concluded in Quarter 4 of 24/25 when a new delivery plan, high level design and service blueprint was developed and approved. These artefacts have informed a change request to the full business case.","startDate":"2020-09-01","endDate":"2025-11-28","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/08/2024 to 28/11/2025. This is primarily due to the following factors‚ The programme has remained as reporting RED throughout 24/25 due to a delay in the full-service go live (expected to be November 2024). Following consultation with critical stakeholders and legal, the City of London Police paused the Lot 1 delivery aspect of the programme, to review next steps in detail. This activity concluded in Quarter 4 of 24/25 when a new delivery plan, high level design and service blueprint was developed and approved. These artefacts have informed a change request to the full business case.","fyBaseline":27.48,"fyForecast":33.0,"fyVariance":20.09,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The budget variance on the cost baseline is due to the delay in full-service delivery which shifted run payments to the right to the new suppliers and increased extension costs of the current service provider","wholeLifeCost":182.72,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 152 to 182. This is primarily due to the following factors‚ The Whole Life Cost has increased due to a shift in right of the full-service implementation date, an increase in annual run costs, inflationary impact and additional scope changes which align with wider ambitions for fraud and cybercrime in the UK.","benefits":402.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 402. This is primarily due to the following factors‚ Benefits remained the same and will be reviewed once the change request of the full business case is presented and approved in Quarter 1 of 25/26.","themes":["Cost & funding","Delivery & schedule","Scope & requirements","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at RED. This is primarily due to the following factors‚ The programme has remained as reporting RED throughout 24/25 due to a delay in the full-service go live (expected to be November 2024). Following consultation with…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"HO_0045_2122-Q1","year":2026,"name":"FRAUD AND CYBER CRIME REPORTING AND ANALYSIS SERVICE","department":"HO","category":"Government Transformation and Service Delivery","description":"The Fraud and Cyber Crime Reporting and Analysis Service (FCCRAS) Programme is a Home Office sponsored reform programme delivered in partnership with law enforcement, government agencies and the private sector. It aims to provide an accessible and effective service for individuals and organisations to report fraud and cyber crime, improving the flow of information and intelligence to support disruption of criminal activity and better protection of the public and businesses. The programme leverages enhanced technology and intelligence-led data analysis to strengthen the national response to fraud and cyber crime, supporting more effective identification, prevention and enforcement activity. The strategic objectives of FCCRAS are improve victim experience and satisfaction, support better criminal justice outcomes, prevent crime and reduce harm, enhance understanding of the threat from serious and organised crime, improve systems interoperability and alignment with wider national programmes.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"GREEN","startDate":"2020-09-01","endDate":null,"scheduleNarrative":"Compared with Q4 2024/25, the project’s end date at Q4 2025/26 has extended from March 2026 to June 2026. This reflects the time required to complete final assurance activity and support a smooth transition to business as usual operations. The subsequent Gateway 5 assurance review, conducted in April 2026, provided a Delivery Confidence Assessment of Green, confirming that the programme is well positioned to proceed to closure. Following confirmation of the Gateway 5 timetable, and to allow sufficient time to address remaining assurance recommendations and complete a comprehensive operational handover, the programme closure date has been revised by three months. The programme is now focused on finalising closure activities and transitioning fully to business‑as‑usual delivery. There is no impact to the approved financial or economic cases. FCCRAS is attending InvestCo for formal closure in June 2026.","fyBaseline":28.77,"fyForecast":28.77,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":169.06,"costNarrative":"Compared to financial year Q4 2024/25, the project's departmentally agreed Whole Cost at Q4 2025/26 has decreased from £182m to £175.3m. This is due to the following factors following the decision to (a) adopt a phased go-live approach to release the service in stages, and (b) progress with a mitigation option to complete the Lot 1 component of programme delivery, the whole life cost of the programme was refined to reflect the actual cost of build and run, and no longer includes optimism bias.","benefits":384.71,"benefitsNarrative":"Compared to financial year Q4 2024/25, the project's departmentally agreed Benefits at Q4 2025/26 remained at £402m. This is primarily due to the following factors benefits remain the same and have been reviewed following revision to the Full Business Case presented to InvestCo in June 2025. The Programme will be closing subject to InvestCo approval in June 2026.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Approvals & decisions"],"evidenceExcerpt":"GREEN Compared with Q4 2024/25, the project’s end date at Q4 2025/26 has extended from March 2026 to June 2026. This reflects the time required to complete final assurance activity and support a smooth transition to business as usual operations. The subsequent Gateway 5 assurance review, conducted in April 2026, provided a Delivery Confidence Assessment of…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"HO_0045_2122-Q1","year":2025,"name":"FRAUD AND CYBER CRIME REPORTING AND ANALYSIS SERVICE","department":"HO","category":"Government Transformation and Service Delivery","description":"The Fraud and Cyber Crime Reporting and Analysis Service (FCCRAS) Programme is implementing a transformational change. Working with law enforcement, government agencies and the private sector, the programme strives to create an accessible service for all to report fraud and cybercrime. It will use enhanced technology, intelligence-led data analysis to disrupt the national rise in fraud and cyber-crime, help protect businesses and the public from deception and bring more criminals to justice.​ The new service aims to: • Make it easy for everyone to report fraud and cyber crime, taking the burden out of reporting and speeding up the time it takes to report • Significantly improve the speed and quality of information provided to law enforcement partners, boosting their chances of successful prosecution • Let victims know what’s happened with their report, including when reporting has aided others to be protected • Protect more businesses and people from fraud and cyber crime through giving targeted, timely advice on how to avoid the latest threats • Block and disrupt crime through providing real time information to institutions and organisations who can take down the fraudulent sites, activities and bank accounts we know are enabling criminal activity • Get ‘upstream’ of the problem by preventing criminals accessing enabling facilities such as bank accounts.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at RED. This is primarily due to the following factors‚ The programme has remained as reporting RED throughout 24/25 due to a delay in the full-service go live (expected to be November 2024). Following consultation with critical stakeholders and legal, the City of London Police paused the Lot 1 delivery aspect of the programme, to review next steps in detail. This activity concluded in Quarter 4 of 24/25 when a new delivery plan, high level design and service blueprint was developed and approved. These artefacts have informed a change request to the full business case.","startDate":"2020-09-01","endDate":"2025-11-28","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/08/2024 to 28/11/2025. This is primarily due to the following factors‚ The programme has remained as reporting RED throughout 24/25 due to a delay in the full-service go live (expected to be November 2024). Following consultation with critical stakeholders and legal, the City of London Police paused the Lot 1 delivery aspect of the programme, to review next steps in detail. This activity concluded in Quarter 4 of 24/25 when a new delivery plan, high level design and service blueprint was developed and approved. These artefacts have informed a change request to the full business case.","fyBaseline":27.48,"fyForecast":33.0,"fyVariance":20.09,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The budget variance on the cost baseline is due to the delay in full-service delivery which shifted run payments to the right to the new suppliers and increased extension costs of the current service provider","wholeLifeCost":182.72,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 152 to 182. This is primarily due to the following factors‚ The Whole Life Cost has increased due to a shift in right of the full-service implementation date, an increase in annual run costs, inflationary impact and additional scope changes which align with wider ambitions for fraud and cybercrime in the UK.","benefits":402.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 402. This is primarily due to the following factors‚ Benefits remained the same and will be reviewed once the change request of the full business case is presented and approved in Quarter 1 of 25/26.","themes":["Cost & funding","Delivery & schedule","Scope & requirements","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at RED. This is primarily due to the following factors‚ The programme has remained as reporting RED throughout 24/25 due to a delay in the full-service go live (expected to be November 2024). Following consultation with…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":-2,"transition":"Improved","endDateDeltaDays":null,"attentionScore":0,"attentionReasons":[]},{"id":"BEIS_0115_2223-Q1","year":2026,"name":"GREEN HEAT NETWORK FUND","department":"DESNZ","category":"Infrastructure and Construction","description":"The Green Heat Network Fund supports the development of low‑carbon heat networks in England. Launched in 2022 to help cut carbon emissions from heating, it provides capital funding to build new low-carbon heat networks and to decarbonise existing ones, helping homes, public buildings and businesses move away from fossil fuels.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The scheme continues to deliver against its objectives, with milestones being met and financial performance broadly on track. Some delays in project implementation may impact the timing of benefits realisation, but these risks are understood and are being actively managed.","startDate":"2022-03-07","endDate":"2030-03-29","scheduleNarrative":"The project's end-date remains unchanged, with the end of funding phase scheduled for 31/03/2028.","fyBaseline":205.8,"fyForecast":202.64,"fyVariance":1.54,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":730.01,"costNarrative":"GHNF WLC has been revised in the updated (2026) GHNF Full Business Case (FBC) to account for the additional budget allocated to the scheme through Phases 1 and 2 of the 2025 Spending Review. The revised WLC will be published in due course.","benefits":3464.54,"benefitsNarrative":"GHNF benefits forecast has been revised in the updated (2026) GHNF Full Business Case (FBC) to account for the additional budget allocated to the scheme through Phases 1 and 2 of the 2025 Spending Review. The revised benefits forecast will be published in due course.","themes":["Cost & funding","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"The scheme continues to deliver against its objectives, with milestones being met and financial performance broadly on track. Some delays in project implementation may impact the timing of benefits realisation, but these risks are understood and are being actively managed. The project's end-date remains unchanged, with the end of funding phase scheduled for…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"BEIS_0115_2223-Q1","year":2023,"name":"Green Heat Network Fund","department":"DESNZ","category":"Infrastructure and Construction","description":"The Green Heat Network Fund (GHNF) is a 288 million capital grant fund that supports the following: (i) Commercialisation and construction of new low and zero-carbon heat networks (including the supply of cooling). (ii) The retrofitting and expansion of existing heat networks to make them low carbon. (iii) The development and growth of the heat network market, addressing some of the challenges of decarbonising the UK's heat sector.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 is Amber. This is primarily due to the following factors. Since the GHNF was launched in March last year, three funding rounds have been completed, with the fourth recently closing for applications. To date, we have publicly announced more than 117 million of GHNF awards to 9 projects which use a range of low-carbon technologies including heat pumps, recovered heat, deep geothermal and energy from waste. This includes an announcement on 12 May of nearly 91.5 million in grant funding to 7 projects in Yorkshire, Cornwall, Reading and London. We believe this is the biggest ever announcement of capital funding for heat network projects in this country in terms of the cumulative amount. The UK Infrastructure Bank also announced on 20 December last year that they will offer councils streamlined access to their 4 billion local authority lending product as part of the GHNF application process. In Powering Up Britain and the Energy Security Plan, published on 30 March, the Government announced that capital support will be extended to 2028 to facilitate the continued growth of low carbon heat networks, including 220m additional capital support over 2025/6 and 2026/7 for the Heat Network Transformation Programme, of which the GHNF is a part. Following this, on 30 May, we announced that additional funding will be available for the GHNF and that projects can now apply for funding that can be drawn down in the financial years through to 2026-27. Further details will be announced in due course.Amendments to the scheme rules have also been included in the latest iteration of the guidance for applicants, which will apply from Round 6. These concern changes to the scheme eligibility with respect to networks supplying new build properties.","startDate":"2022-03-07","endDate":"2025-03-30","scheduleNarrative":"The project's end-date at 22/23-Q4 is 2025-03-30. This is primarily due to the following factors. The project's end-date at 22/23-Q4 is 2025-03-30. This is due to: Currently, the project end-date remains unchanged but the award of 220m to the Heat Network Transformation Programme for FY2025/26 and FY2026/27 means that continued capital support will be available for longer.","fyBaseline":101.5,"fyForecast":10.14,"fyVariance":-90.0,"varianceNarrative":"Year 1 CDEL spent was substantially lower than Year 1 budget. This underspend was expected at the point of business case approval and unspent funds were offered for reallocation in a timely manner.","wholeLifeCost":298.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 22/23-Q4 is 298m. This is primarily due to the following factors. The project's departmental-agree Whole Life Cost at 22/23-Q4 is 298m. This is due to: The scheme is on track to be delivered to budget, with recorded CDEL underspend in year 1.","benefits":2267.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 2267m. GHNF's departmental-agreed total monetised benefits is expected to be an estimated 2267.05m over its lifetime (baseline). This estimate remains the same at 22/23. Specifically, the GHNF project is tracking the following benefits:1. An increased volume of thermal energy supplied through low-carbon sources2. Decreased carbon intensity of heat delivered by GHNF supported heat networks3. Monetised carbon savings and air quality improvements4. Increased use of recovered heat in heat networks funded via GHNF5. Increased investment in the UK heat network market","themes":["Cost & funding","Approvals & decisions","Delivery & schedule"],"evidenceExcerpt":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 is Amber. This is primarily due to the following factors. Since the GHNF was launched in March last year, three funding rounds have been completed, with the fourth recently closing for applications. To date, we have publicly announced more than 117 million of GHNF awards to 9…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"BEIS_0115_2223-Q1","year":2024,"name":"Green Heat Network Fund","department":"DESNZ","category":"Infrastructure and Construction","description":"The vision for the GHNF scheme is to incentivise the transition of the heat network market to low-carbon heat sources via targeted financial support, that will help stimulate the increased deployment of low-carbon technologies at scale to support governments Net Zero agenda. The GHNF objectives are as follows:(i) Achieve carbon savings and decreases in carbon intensity of heat supplied. (ii) Increase the total amount of low-carbon heat utilisation in heat networks (both retrofitted and new heat networks). (iii) Contribute towards market transformations across the investment landscape and supply chain that will better prepare the heat network sector for further decarbonisation.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 22/23-Q4, Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 decreased from Amber to Green. This is primarily due to the following factors. GHNF opened to applicants in March 2022 as a 288m capital grant fund. Further capital was secured for the scheme in 2023. This enabled us to extend the scheme and allocate additional funding in line with a strong pipeline and high demand. Having implemented an extension to Delivery Partner contract, the overall delivery confidence is high.","startDate":"2022-03-07","endDate":"2028-06-30","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 increased from 2025-03-30 to 2028-06-30. This is primarily due to the following factors. Additional capital allocation was made to GHNF in 2023. As a result, GHNF capital funding is spread over six years - from FY 2022/23 to FY 2027/28. GHNF Delivery Partner contract was extended in light of this. The revised Project End Date is 30/06/2028.","fyBaseline":94.0,"fyForecast":69.7,"fyVariance":-26.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. GHNF budget for FY2023/24 was reduced from the original Spending Review allocation of 90m to fund other departmental priorities. GHNF capital spend in this FY was 66.6m against the reduced budget of 73.5m. The same year, the underspend on GHNF resource budget of 4m was of c. 870,000.","wholeLifeCost":null,"costNarrative":"GHNF Whole Life Cost was re-baselined to reflect additional capital and resource allocation made in 2023.","benefits":3344.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 2324-Q4 increased from 2267m. to 3344m. The GHNF is tracking the following primary benefits: 1. An increased volume of thermal energy supplied through low-carbon sources 2. Decreased carbon intensity of heat delivered by GHNF supported heat networks 3. Monetised carbon savings and air quality improvements 4. Increased use of recovered heat in heat networks funded via GHNF is being tracked as a secondary benefit. This change was approved in the updated GHNF FBC in Oct-Nov 2023. 5. Increased investment in the UK heat network market","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 decreased from Amber to Green. This is primarily due to the following factors. GHNF opened to applicants in March 2022 as a 288m capital grant fund. Further capital was secured for the scheme in 2023. This enabled us to extend the scheme and…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"BEIS_0115_2223-Q1","year":2025,"name":"GREEN HEAT NETWORK FUND","department":"DESNZ","category":"Infrastructure and Construction","description":"The vision for the GHNF scheme is to incentivise the transition to low-carbon heat networks via targeted financial support, which will stimulate the increased deployment of low-carbon technologies at scale to help deliver Net Zero. The GHNF objectives are as follows: (i) Achieve carbon savings and decreases in carbon intensity of heat supplied. (ii) Increase the total amount of low-carbon heat utilisation in heat networks (both retrofitted and new heat networks). (iii) Contribute towards market transformations across the investment landscape and supply chain that will better prepare the heat network sector for further decarbonisation.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at GREEN. This is primarily due to the following factors: (i) GHNF has now allocated funding to 63 projects in 54 towns and cities, and the scheme is on track to fully deploy its CDEL budget. (ii) Forecast data shows GHNF is on track to meet or exceed its benefit targets. (iii) The GHNF Supplementary Contract is in place in the event that additional CDEL budget is allocated to GHNF.","startDate":"2022-03-07","endDate":null,"scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 30/06/2028 to 31/03/2030. This is primarily due to the following factors: The revised project end-date reflects the end-date of the recently procured Supplementary GHNF Delivery Partner Contract, which is now in place. The previous end-date reflected the existing GHNF Delivery Partner contract.","fyBaseline":103.6,"fyForecast":127.22,"fyVariance":22.8,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors: GHNF’s 2024/25 capital spend was approximately 122% of its Year 3 budget. The additional 22% was from underspend elsewhere in the Department.","wholeLifeCost":701.63,"costNarrative":"The project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) is 701. This is primarily due to the following factors: The GHNF WLC comprises of (i) GHNF CDEL grant budget and (ii) internal/other costs associated with administering and evaluating the GHNF.","benefits":3344.41,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 3344. This is primarily due to the following factors: Forecast data shows GHNF is on track to meet or exceed its benefit targets.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Technical & integration"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at GREEN. This is primarily due to the following factors: (i) GHNF has now allocated funding to 63 projects in 54 towns and cities, and the scheme is on track to fully deploy its CDEL budget. (ii) Forecast data shows GHNF is…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"BEIS_0115_2223-Q1","year":2026,"name":"GREEN HEAT NETWORK FUND","department":"DESNZ","category":"Infrastructure and Construction","description":"The Green Heat Network Fund supports the development of low‑carbon heat networks in England. Launched in 2022 to help cut carbon emissions from heating, it provides capital funding to build new low-carbon heat networks and to decarbonise existing ones, helping homes, public buildings and businesses move away from fossil fuels.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The scheme continues to deliver against its objectives, with milestones being met and financial performance broadly on track. Some delays in project implementation may impact the timing of benefits realisation, but these risks are understood and are being actively managed.","startDate":"2022-03-07","endDate":"2030-03-29","scheduleNarrative":"The project's end-date remains unchanged, with the end of funding phase scheduled for 31/03/2028.","fyBaseline":205.8,"fyForecast":202.64,"fyVariance":1.54,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":730.01,"costNarrative":"GHNF WLC has been revised in the updated (2026) GHNF Full Business Case (FBC) to account for the additional budget allocated to the scheme through Phases 1 and 2 of the 2025 Spending Review. The revised WLC will be published in due course.","benefits":3464.54,"benefitsNarrative":"GHNF benefits forecast has been revised in the updated (2026) GHNF Full Business Case (FBC) to account for the additional budget allocated to the scheme through Phases 1 and 2 of the 2025 Spending Review. The revised benefits forecast will be published in due course.","themes":["Cost & funding","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"The scheme continues to deliver against its objectives, with milestones being met and financial performance broadly on track. Some delays in project implementation may impact the timing of benefits realisation, but these risks are understood and are being actively managed. The project's end-date remains unchanged, with the end of funding phase scheduled for…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"BEIS_0115_2223-Q1","year":2025,"name":"GREEN HEAT NETWORK FUND","department":"DESNZ","category":"Infrastructure and Construction","description":"The vision for the GHNF scheme is to incentivise the transition to low-carbon heat networks via targeted financial support, which will stimulate the increased deployment of low-carbon technologies at scale to help deliver Net Zero. The GHNF objectives are as follows: (i) Achieve carbon savings and decreases in carbon intensity of heat supplied. (ii) Increase the total amount of low-carbon heat utilisation in heat networks (both retrofitted and new heat networks). (iii) Contribute towards market transformations across the investment landscape and supply chain that will better prepare the heat network sector for further decarbonisation.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at GREEN. This is primarily due to the following factors: (i) GHNF has now allocated funding to 63 projects in 54 towns and cities, and the scheme is on track to fully deploy its CDEL budget. (ii) Forecast data shows GHNF is on track to meet or exceed its benefit targets. (iii) The GHNF Supplementary Contract is in place in the event that additional CDEL budget is allocated to GHNF.","startDate":"2022-03-07","endDate":null,"scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 30/06/2028 to 31/03/2030. This is primarily due to the following factors: The revised project end-date reflects the end-date of the recently procured Supplementary GHNF Delivery Partner Contract, which is now in place. The previous end-date reflected the existing GHNF Delivery Partner contract.","fyBaseline":103.6,"fyForecast":127.22,"fyVariance":22.8,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors: GHNF’s 2024/25 capital spend was approximately 122% of its Year 3 budget. The additional 22% was from underspend elsewhere in the Department.","wholeLifeCost":701.63,"costNarrative":"The project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) is 701. This is primarily due to the following factors: The GHNF WLC comprises of (i) GHNF CDEL grant budget and (ii) internal/other costs associated with administering and evaluating the GHNF.","benefits":3344.41,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 3344. This is primarily due to the following factors: Forecast data shows GHNF is on track to meet or exceed its benefit targets.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Technical & integration"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at GREEN. This is primarily due to the following factors: (i) GHNF has now allocated funding to 63 projects in 54 towns and cities, and the scheme is on track to fully deploy its CDEL budget. (ii) Forecast data shows GHNF is…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":null,"attentionScore":0,"attentionReasons":[]},{"id":"HO_0150_2223-Q2","year":2026,"name":"MARITIME CAPABILITIES REPLACEMENT PROGRAMME","department":"HO","category":"Government Transformation and Service Delivery","description":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information, Section 43 - Commercial interests","startDate":null,"endDate":null,"scheduleNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide costs/schedule information","wholeLifeCost":null,"costNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","benefits":null,"benefitsNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","themes":["Delivery & schedule","Cost & funding","Commercial & supply chain"],"evidenceExcerpt":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information, Section 43 - Commercial interests The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"HO_0150_2223-Q2","year":2024,"name":"Maritime Capabilities Replacement Programme","department":"HO","category":"Government Transformation and Service Delivery","description":"The Maritime Capabilities Replacement Programme (MCRP) will coordinate the delivery into service of a new fleet of Cutters and Coastal Patrol Vessels (CPVs), with the appropriate capabilities and supporting infrastructure to deliver Home Office and wider UK government maritime security goals and to ensure that the vessels remain 'fit for purpose' for the duration of their operational lifetime.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"ARMP adjustments - Project not yet in a position to give cost/schedule","startDate":null,"endDate":null,"scheduleNarrative":"ARMP adjustments - Project not yet in a position to give cost/schedule","fyBaseline":0.0,"fyForecast":0.0,"fyVariance":null,"varianceNarrative":"ARMP adjustments - Project not yet in a position to give cost/schedule","wholeLifeCost":null,"costNarrative":"ARMP adjustments - Project not yet in a position to give cost/schedule","benefits":null,"benefitsNarrative":"ARMP adjustments - Project not yet in a position to give cost/schedule","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"ARMP adjustments - Project not yet in a position to give cost/schedule ARMP adjustments - Project not yet in a position to give cost/schedule","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"HO_0150_2223-Q2","year":2025,"name":"MARITIME CAPABILITIES REPLACEMENT PROGRAMME","department":"HO","category":"Government Transformation and Service Delivery","description":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information, Section 43 - Commercial interests","startDate":null,"endDate":null,"scheduleNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","wholeLifeCost":null,"costNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","benefits":null,"benefitsNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain"],"evidenceExcerpt":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information, Section 43 - Commercial interests The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"HO_0150_2223-Q2","year":2026,"name":"MARITIME CAPABILITIES REPLACEMENT PROGRAMME","department":"HO","category":"Government Transformation and Service Delivery","description":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information, Section 43 - Commercial interests","startDate":null,"endDate":null,"scheduleNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide costs/schedule information","wholeLifeCost":null,"costNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","benefits":null,"benefitsNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","themes":["Delivery & schedule","Cost & funding","Commercial & supply chain"],"evidenceExcerpt":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information, Section 43 - Commercial interests The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"HO_0150_2223-Q2","year":2025,"name":"MARITIME CAPABILITIES REPLACEMENT PROGRAMME","department":"HO","category":"Government Transformation and Service Delivery","description":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information, Section 43 - Commercial interests","startDate":null,"endDate":null,"scheduleNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","wholeLifeCost":null,"costNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","benefits":null,"benefitsNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain"],"evidenceExcerpt":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information, Section 43 - Commercial interests The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":null,"transition":"Not comparable","endDateDeltaDays":null,"attentionScore":0,"attentionReasons":[]},{"id":"MOJ_0060_2122-Q3","year":2026,"name":"PFI Prison Expiry and Transfer Tranche 2","department":"MOJ","category":"Government Transformation and Service Delivery","description":"The aim of this project is to carry out the exit and transfer of services at HMP Ashfield and Forest Bank in a safe, effective and efficient manner following the expiry of their PFI contracts. HMPPS needs to undertake essential work to ensure it is able to manage the expiry of the Project Agreements and transfer the service, while maintaining continuity so there is no disruption to the regime or capacity at the prisons and also ensure opportunities to modernise the sites and align service provision to future need is fully considered. The project scope also includes delivering 458 additional prison places through the Rye Hill houseblock delivery. Project scope change approval was received in March 2026 to transfer the remaining HMP Rye Hill activity competition re-run to a later Tranche.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25-Q4, the NISTA Delivery Confidence Assessment (DCA) rating at 25/26-Q4 has increased from Amber to Green. This is primarily due to the ​agreement to move the remaining HMP Rye Hill operator competition to a later tranche, meaning the remaining delivery is now approaching completion following the successful transfer of services and exit of the existing PFI contracts at HMPs Ashfield and Forest Bank and the delivery of HMP Rye Hill Houseblock expansion.","startDate":"2022-01-22","endDate":"2026-07-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project at 25/26-Q4 remains scheduled to finished on 31/10/26. The project is on track to deliver against the baseline schedule following the transfer of remaining HMP Rye Hill activity to a later Tranche.","fyBaseline":86.12,"fyForecast":88.7,"fyVariance":3.0,"varianceNarrative":"The budget variance is less or equal to 5%.","wholeLifeCost":2730.04,"costNarrative":"The HMT-agreed Whole Life Cost for 25/26-Q4 has decreased from £3,862.165m to £2,730.04m. All costs have been reported in 2024/25 base prices in line with NISTA requirements. This is a change from previous years where costs were reported in nominal prices. All costs reflect this accounting reduction regardless of any actual changes.","benefits":null,"benefitsNarrative":"This project currently reports no monetised benefits. The project seeks to realise efficiencies in future operating costs following the transfer of service to new operator contracts when compared to the PFI contracts. The project benefits also include the focus on the continued quality of service across the PFI contracts until expiry, and following the transfer of service, improvements in service quality in the new contract in line with the key Departmental priorities.","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 24/25-Q4, the NISTA Delivery Confidence Assessment (DCA) rating at 25/26-Q4 has increased from Amber to Green. This is primarily due to the ​agreement to move the remaining HMP Rye Hill operator competition to a later tranche, meaning the remaining delivery is now approaching completion following the successful transfer of…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"MOJ_0060_2122-Q3","year":2023,"name":"PFI Prison Expiry and Transfer Tranche 2","department":"MOJ","category":"Government Transformation and Service Delivery","description":"The aim of this project is to carry out the exit and transfer of services at HMP Ashfield, Forest Bank and Rye Hill in a safe, effective and efficient manner following the expiry of their PFI contracts between Q3 2023 and Q4 2025. HMPPS is undertaking essential work to ensure it is able to manage the expiry of the Project Agreements and transfer the service, while maintaining regime continuity and to ensure opportunities to modernise the sites and align service provision to future needs are fully considered","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 is Amber. This is primarily due to the following factors. This is the first time data has been published for this project, which has been added to GMPP over the last year.The Amber assessment is due to inherent risk in the project's timelines.","startDate":"2022-01-22","endDate":"2026-07-31","scheduleNarrative":"The project's end-date at 22/23-Q4 is 2026-07-31. This is primarily due to the following factors. The project is on track against the baseline schedule.","fyBaseline":0.0,"fyForecast":0.91,"fyVariance":null,"varianceNarrative":"Variance is less than 5%, so no narrative required","wholeLifeCost":1544.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 22/23-Q4 is 1544m. This is primarily due to the following factors. The Whole Life Costs includecosts of operating the three prisons andexpected capital costs.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This project currently reports no monetised benefits. The project expects to realise efficiencies in future operating costs following the transfer of service to new operator contracts when compared to the PFI contracts. The project benefits also include the focus on the continued quality of service across the PFI contracts until expiry, and following the transfer of service, improvements in service quality in the new contract in line with the key priorities set out in the Prison Strategy White Paper.","themes":["Cost & funding","Delivery & schedule","Technical & integration"],"evidenceExcerpt":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 is Amber. This is primarily due to the following factors. This is the first time data has been published for this project, which has been added to GMPP over the last year.The Amber assessment is due to inherent risk in the project's timelines. The project's end-date at 22/23-Q4…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23"},{"id":"MOJ_0060_2122-Q3","year":2024,"name":"PFI Prison Expiry and Transfer Tranche 2","department":"MOJ","category":"Government Transformation and Service Delivery","description":"The aim of this project is to carry out the exit and transfer of services at HMP Ashfield, Forest Bank and Rye Hill in a safe, effective and efficient manner following the expiry of their PFI contracts. HMPPS needs to undertake essential work to ensure it is able to manage the expiry of the Project Agreements and transfer the service, while maintaining continuity so there is no disruption to the regime or capacity at the prisons and also ensure opportunities to modernise the sites and align service provision to future need is fully considered. Following a change in 23/24-Q4 the project scope also includes the expansion of HMP Rye Hill through the construction of an additional houseblock at the prison.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The limited contingency and complexity of the expiry and transfer activities still to be delivered.","startDate":"2022-01-22","endDate":"2026-07-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2026-07-31. This is primarily due to the following factors. The project is on track to deliver against the baseline schedule.","fyBaseline":16.46,"fyForecast":48.66,"fyVariance":196.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The overspend is due to previous changes in the delivery plan, requiring some costs to be re-profiled into this financial year.","wholeLifeCost":4347.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 increased from 1544m. to 4347m. This is primarily due to the following factors. The expansion of the project scope following the addition of the Rye Hill Houseblock Expansion from the Houseblocks and Refurbishments Programme.","benefits":0.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 0m. This project currently reports no monetised benefits. The project seeks to realise efficiencies in future operating costs following the transfer of service to new operator contracts when compared to the PFI contracts. The project benefits also include the focus on the continued quality of service across the PFI contracts until expiry, and following the transfer of service, improvements in service quality in the new contract in line with the key priorities set out in the Prison Strategy White Paper and MoJ Outcome Delivery Plan.","themes":["Cost & funding","Delivery & schedule","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The limited contingency and complexity of the expiry and transfer activities still to be delivered. Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24"},{"id":"MOJ_0060_2122-Q3","year":2025,"name":"PFI Prison Expiry and Transfer Tranche 2","department":"MoJ","category":"Government Transformation and Service Delivery","description":"The aim of this project is to carry out the exit and transfer of services at HMP Ashfield, Forest Bank and Rye Hill in a safe, effective and efficient manner following the expiry of their PFI contracts. HMPPS needs to undertake essential work to ensure it is able to manage the expiry of the Project Agreements and transfer the service, while maintaining continuity so there is no disruption to the regime or capacity at the prisons and also ensure opportunities to modernise the sites and align service provision to future need is fully considered. Following a change in 23/24-Q4 the project scope also includes the expansion of HMP Rye Hill through the construction of an additional houseblock at the prison.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Limited contingency and the complexity of the expiry and transfer activities still to be delivered.","startDate":"2022-01-22","endDate":"2026-10-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/07/2026 to 31/10/2026. This is primarily due to the following factors‚ The project has re-baselined its schedule having applied lessons learned from the PFI Tranche 1 project.","fyBaseline":41.3,"fyForecast":67.71,"fyVariance":63.94,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The overspend is due to previous changes in the delivery plan, requiring some costs to be re-profiled into this financial year.","wholeLifeCost":3862.16,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 4347 to 3862. This is primarily due to the following factors‚ The decrease is due to a correction of modelled costs for the additional houseblock at HMP Rye Hill.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ This project currently reports no monetised benefits. The project seeks to realise efficiencies in future operating costs following the transfer of service to new operator contracts when compared to the PFI contracts. The project benefits also include the focus on the continued quality of service across the PFI contracts until expiry, and following the transfer of service, improvements in service quality in the new contract in line with the key Departmental priorities.","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Limited contingency and the complexity of the expiry and transfer activities still to be delivered. Compared to financial year 23/24-Q4, the project's end-date at…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"MOJ_0060_2122-Q3","year":2026,"name":"PFI Prison Expiry and Transfer Tranche 2","department":"MOJ","category":"Government Transformation and Service Delivery","description":"The aim of this project is to carry out the exit and transfer of services at HMP Ashfield and Forest Bank in a safe, effective and efficient manner following the expiry of their PFI contracts. HMPPS needs to undertake essential work to ensure it is able to manage the expiry of the Project Agreements and transfer the service, while maintaining continuity so there is no disruption to the regime or capacity at the prisons and also ensure opportunities to modernise the sites and align service provision to future need is fully considered. The project scope also includes delivering 458 additional prison places through the Rye Hill houseblock delivery. Project scope change approval was received in March 2026 to transfer the remaining HMP Rye Hill activity competition re-run to a later Tranche.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25-Q4, the NISTA Delivery Confidence Assessment (DCA) rating at 25/26-Q4 has increased from Amber to Green. This is primarily due to the ​agreement to move the remaining HMP Rye Hill operator competition to a later tranche, meaning the remaining delivery is now approaching completion following the successful transfer of services and exit of the existing PFI contracts at HMPs Ashfield and Forest Bank and the delivery of HMP Rye Hill Houseblock expansion.","startDate":"2022-01-22","endDate":"2026-07-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project at 25/26-Q4 remains scheduled to finished on 31/10/26. The project is on track to deliver against the baseline schedule following the transfer of remaining HMP Rye Hill activity to a later Tranche.","fyBaseline":86.12,"fyForecast":88.7,"fyVariance":3.0,"varianceNarrative":"The budget variance is less or equal to 5%.","wholeLifeCost":2730.04,"costNarrative":"The HMT-agreed Whole Life Cost for 25/26-Q4 has decreased from £3,862.165m to £2,730.04m. All costs have been reported in 2024/25 base prices in line with NISTA requirements. This is a change from previous years where costs were reported in nominal prices. All costs reflect this accounting reduction regardless of any actual changes.","benefits":null,"benefitsNarrative":"This project currently reports no monetised benefits. The project seeks to realise efficiencies in future operating costs following the transfer of service to new operator contracts when compared to the PFI contracts. The project benefits also include the focus on the continued quality of service across the PFI contracts until expiry, and following the transfer of service, improvements in service quality in the new contract in line with the key Departmental priorities.","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 24/25-Q4, the NISTA Delivery Confidence Assessment (DCA) rating at 25/26-Q4 has increased from Amber to Green. This is primarily due to the ​agreement to move the remaining HMP Rye Hill operator competition to a later tranche, meaning the remaining delivery is now approaching completion following the successful transfer of…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"MOJ_0060_2122-Q3","year":2025,"name":"PFI Prison Expiry and Transfer Tranche 2","department":"MoJ","category":"Government Transformation and Service Delivery","description":"The aim of this project is to carry out the exit and transfer of services at HMP Ashfield, Forest Bank and Rye Hill in a safe, effective and efficient manner following the expiry of their PFI contracts. HMPPS needs to undertake essential work to ensure it is able to manage the expiry of the Project Agreements and transfer the service, while maintaining continuity so there is no disruption to the regime or capacity at the prisons and also ensure opportunities to modernise the sites and align service provision to future need is fully considered. Following a change in 23/24-Q4 the project scope also includes the expansion of HMP Rye Hill through the construction of an additional houseblock at the prison.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Limited contingency and the complexity of the expiry and transfer activities still to be delivered.","startDate":"2022-01-22","endDate":"2026-10-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/07/2026 to 31/10/2026. This is primarily due to the following factors‚ The project has re-baselined its schedule having applied lessons learned from the PFI Tranche 1 project.","fyBaseline":41.3,"fyForecast":67.71,"fyVariance":63.94,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The overspend is due to previous changes in the delivery plan, requiring some costs to be re-profiled into this financial year.","wholeLifeCost":3862.16,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 4347 to 3862. This is primarily due to the following factors‚ The decrease is due to a correction of modelled costs for the additional houseblock at HMP Rye Hill.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ This project currently reports no monetised benefits. The project seeks to realise efficiencies in future operating costs following the transfer of service to new operator contracts when compared to the PFI contracts. The project benefits also include the focus on the continued quality of service across the PFI contracts until expiry, and following the transfer of service, improvements in service quality in the new contract in line with the key Departmental priorities.","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Limited contingency and the complexity of the expiry and transfer activities still to be delivered. Compared to financial year 23/24-Q4, the project's end-date at…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":-1,"transition":"Improved","endDateDeltaDays":-92,"attentionScore":0,"attentionReasons":[]},{"id":"DFT_0139_2223-Q1","year":2026,"name":"REDEVELOPMENT EUSTON CONVENTIONAL STATION (RECS)","department":"DFT","category":"Infrastructure and Construction","description":"Euston is one of the UK’s most critical rail transportation hubs. The current station is no longer fit for purpose and operating over capacity, with many station assets reaching the end of their service life. The proposed Redevelopment of Euston Conventional Station (RECS) scheme will update the existing station concourse area to accommodate current and future passenger demand on the West Coast Main Line, improve passenger experience and accessibility, while replacing life expired station assets in a cost-effective manner. The RECS project forms an integral part of the Departments wider plans for the Euston Station Campus. The Department is working with key partners to develop affordable, integrated plans for the Euston Station Campus, which will comprise the new High Speed 2 station, an upgraded Network Rail station and enhancements to the London Underground station and local transport facilities along with a significant level of development. The Government is seeking to deliver benefits far beyond a new, improved station, promoting growth both in the Euston area and nationally with thousands of new homes, jobs and opportunities for businesses to thrive.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 35 - Formulation of government policy","startDate":null,"endDate":null,"scheduleNarrative":"Exempt under Section 35 - Formulation of government policy","fyBaseline":13.34,"fyForecast":13.34,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%","wholeLifeCost":null,"costNarrative":"Exempt under Section 35 - Formulation of government policy","benefits":null,"benefitsNarrative":"Exempt under Section 35 - Formulation of government policy","themes":["Cost & funding"],"evidenceExcerpt":"Exempt under Section 35 - Formulation of government policy Exempt under Section 35 - Formulation of government policy","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","history":[{"id":"DFT_0139_2223-Q1","year":2025,"name":"REDEVELOPMENT EUSTON CONVENTIONAL STATION (RECS)","department":"DfT","category":"Infrastructure and Construction","description":"Euston is one of the UK’s most critical rail transportation hubs. The current station is no longer fit for purpose and operating over capacity, with many station assets reaching the end of their service life. The proposed Redevelopment of Euston Conventional Station (RECS) scheme will update the existing station concourse area to accommodate current and future passenger demand on the West Coast Main Line, improve passenger experience and accessibility, while replacing life expired station assets in a cost-effective manner. The RECS project forms an integral part of the Departments wider plans for the Euston Station Campus. The Department is working with key partners to develop affordable, integrated plans for the Euston Station Campus, which will comprise the new High Speed 2 station, an upgraded Network Rail station and enhancements to the London Underground station and local transport facilities along with a significant level of development. The Government is seeking to deliver benefits far beyond a new, improved station, promoting growth both in the Euston area and nationally with thousands of new homes, jobs and opportunities for businesses to thrive.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Section 35 - Formulation of government policy","startDate":null,"endDate":null,"scheduleNarrative":"Section 35 - Formulation of government policy","fyBaseline":12.89,"fyForecast":12.89,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%. RECS is currently being reset and holding the latest Spending Review 25 Phase 1 Rail Network Enhancement Pipeline (RNEP) interim funding baseline position as its CP7 forecast (£1.3bn-1.55bn set in SR21 at Q3 2019 prices).","wholeLifeCost":null,"costNarrative":"Section 35 - Formulation of government policy","benefits":null,"benefitsNarrative":"The project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) is exempted. This is primarily due to the following factors‚ RECS is currently being reset, and a revised scope will be confirmed in Summer 2025 as part of the completion of the Euston Campus Spatial Planning exercise. Benefits of the revised scope have not been calculated yet.","themes":["Cost & funding","Approvals & decisions","Governance & assurance","Scope & requirements"],"evidenceExcerpt":"Section 35 - Formulation of government policy Section 35 - Formulation of government policy","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},{"id":"DFT_0139_2223-Q1","year":2026,"name":"REDEVELOPMENT EUSTON CONVENTIONAL STATION (RECS)","department":"DFT","category":"Infrastructure and Construction","description":"Euston is one of the UK’s most critical rail transportation hubs. The current station is no longer fit for purpose and operating over capacity, with many station assets reaching the end of their service life. The proposed Redevelopment of Euston Conventional Station (RECS) scheme will update the existing station concourse area to accommodate current and future passenger demand on the West Coast Main Line, improve passenger experience and accessibility, while replacing life expired station assets in a cost-effective manner. The RECS project forms an integral part of the Departments wider plans for the Euston Station Campus. The Department is working with key partners to develop affordable, integrated plans for the Euston Station Campus, which will comprise the new High Speed 2 station, an upgraded Network Rail station and enhancements to the London Underground station and local transport facilities along with a significant level of development. The Government is seeking to deliver benefits far beyond a new, improved station, promoting growth both in the Euston area and nationally with thousands of new homes, jobs and opportunities for businesses to thrive.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 35 - Formulation of government policy","startDate":null,"endDate":null,"scheduleNarrative":"Exempt under Section 35 - Formulation of government policy","fyBaseline":13.34,"fyForecast":13.34,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%","wholeLifeCost":null,"costNarrative":"Exempt under Section 35 - Formulation of government policy","benefits":null,"benefitsNarrative":"Exempt under Section 35 - Formulation of government policy","themes":["Cost & funding"],"evidenceExcerpt":"Exempt under Section 35 - Formulation of government policy Exempt under Section 35 - Formulation of government policy","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26"}],"previous":{"id":"DFT_0139_2223-Q1","year":2025,"name":"REDEVELOPMENT EUSTON CONVENTIONAL STATION (RECS)","department":"DfT","category":"Infrastructure and Construction","description":"Euston is one of the UK’s most critical rail transportation hubs. The current station is no longer fit for purpose and operating over capacity, with many station assets reaching the end of their service life. The proposed Redevelopment of Euston Conventional Station (RECS) scheme will update the existing station concourse area to accommodate current and future passenger demand on the West Coast Main Line, improve passenger experience and accessibility, while replacing life expired station assets in a cost-effective manner. The RECS project forms an integral part of the Departments wider plans for the Euston Station Campus. The Department is working with key partners to develop affordable, integrated plans for the Euston Station Campus, which will comprise the new High Speed 2 station, an upgraded Network Rail station and enhancements to the London Underground station and local transport facilities along with a significant level of development. The Government is seeking to deliver benefits far beyond a new, improved station, promoting growth both in the Euston area and nationally with thousands of new homes, jobs and opportunities for businesses to thrive.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Section 35 - Formulation of government policy","startDate":null,"endDate":null,"scheduleNarrative":"Section 35 - Formulation of government policy","fyBaseline":12.89,"fyForecast":12.89,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%. RECS is currently being reset and holding the latest Spending Review 25 Phase 1 Rail Network Enhancement Pipeline (RNEP) interim funding baseline position as its CP7 forecast (£1.3bn-1.55bn set in SR21 at Q3 2019 prices).","wholeLifeCost":null,"costNarrative":"Section 35 - Formulation of government policy","benefits":null,"benefitsNarrative":"The project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) is exempted. This is primarily due to the following factors‚ RECS is currently being reset, and a revised scope will be confirmed in Summer 2025 as part of the completion of the Euston Campus Spatial Planning exercise. Benefits of the revised scope have not been calculated yet.","themes":["Cost & funding","Approvals & decisions","Governance & assurance","Scope & requirements"],"evidenceExcerpt":"Section 35 - Formulation of government policy Section 35 - Formulation of government policy","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25"},"ratingDelta":null,"transition":"Not comparable","endDateDeltaDays":null,"attentionScore":0,"attentionReasons":[]}],"leavers":[{"id":"BEIS_0001_2122-Q2","year":2025,"name":"LOW COST NUCLEAR PROGRAMME (ROLLS ROYCE SMRS CHALLENGE)","department":"DESNZ","category":"Infrastructure and Construction","description":"The Low Cost Nuclear Programme Phase 2 is a 468m (210 grant + 258 match funding) Research and Development (R&D) and innovation project aiming to further develop the UK small modular reactor power station concept, including maturation of engineering design iterations and progress through the regulatory Generic Design Assessment (GDA) to at least the completion of the Step 2 by 31/03/25. The grant recipient, and lead on the project is Rolls Royce SMR Ltd. DESNZ is responsible for the project, and have appointed UKRI as delivery partner, providing programme management and assurance of the grant.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at GREEN. This is primarily due to the following factors‚ Active work has been completed by Rolls Royce SMR Ltd against the latest version of the project plan. A final significant PCR stabilised project finance and milestones in the last few months of the programme. Work on the project during the final year has shifted and gone beyond the completion of Step 2 of the Generic Design Assessment (GDA) to maintaining the consistency of work as part of a much larger industry led programme.","startDate":"2021-05-01","endDate":"2025-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2025. This is primarily due to the following factors‚ Key drivers for the timeline of the project were the need to reach design maturity points and progress through Generic Design Assessment (GDA). Step 2 of GDA was completed by 31/07/2024 with the remainder of the objectives and benefits progressed by 30/03/2025. It should be noted that development of the RR SMR design including further GDA progress continues after the end of grant funding.","fyBaseline":211.36,"fyForecast":197.2,"fyVariance":6.7,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The project underwent several project plan changes during its lifetime with associated budget shifts and optimisation of funding flow. The variance in the final year is a result of significant work moving to the later stages of the project to reflect investor confidence levels and design changes inspired by development and regulatory feedback.","wholeLifeCost":468.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 468. This is primarily due to the following factors‚ The project has delivered key outcomes on design maturity, supply chain requirements and completion of Step 2 of the Generic Design Assessment (GDA) regulatory assessment within the timeframe. Costs were driven by staff resource needed to mature the design and work required to progress GDA to Step 2 and beyond.","benefits":280.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 280. This is primarily due to the following factors‚ As an R&D project the majority of benefits are non-monetised. Direct monetised benefits will be realised through the co-investment in this phase of R&D provided by Rolls Royce SMR Ltd.","themes":["Cost & funding","Scope & requirements","Delivery & schedule","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at GREEN. This is primarily due to the following factors‚ Active work has been completed by Rolls Royce SMR Ltd against the latest version of the project plan. A final significant PCR stabilised project finance and…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","outcomeStatus":"Outcome not established in annual CSV","outcomeEvidence":"The project has no record in the 2025-26 release. The annual CSV does not identify whether it delivered, closed early, was replaced or ceased to meet the portfolio criteria."},{"id":"BEIS_0007_2021-Q3","year":2025,"name":"REPLACEMENT ANALYTICAL PROJECT","department":"DESNZ","category":"Infrastructure and Construction","description":"The Replacement Analytical Project is a key component of the Sellafield Ltd Analytical Services, which provides essential services to operations on the Sellafield Site supporting approximately 200 Operational Facilities. The existing facility is over 70 years old and cannot provide long-term capability so new analytical capabilities are needed to be established. The Replacement Analytical Project has therefore been initiated to deliver future analytical capability to the Sellafield site, through a major modification of the National Nuclear Laboratory Central Laboratory. Key modifications are provision of standalone Highly Active (HA), Medium Active (MA) and Special Nuclear Material (SNM) analytical capability. A key part of the scope is the delivery of 135 Analytical Instruments which will perform the ongoing analysis required by facilities at Sellafield. Analytical Services remains essential to the delivery of high hazard reduction and remediation until the completion of the Sellafield Ltd mission.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at RED. This is primarily due to the following factors‚ On the 26th of February 2024, the Sellafield Ltd CEO made the decision to bring the Replacement Analytical Project (RAP) to a strategic pause. SL are reviewing the current and future analytical services requirements of the Sellafield site.","startDate":"2016-09-26","endDate":"2032-10-30","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 10/07/2028 to 30/10/2032. This is primarily due to the following factors‚ As a result of the strategic decision to pause the project, a deferral has been implemented with the forecast project end date aligned to this. However, this is subject to a pending a decision on the final project close out.","fyBaseline":9.95,"fyForecast":9.24,"fyVariance":7.14,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ 2024/25 Departmental Baseline: £9.950m, 2024/25 Actuals: £9.240m. Reflection of Research and Development tax credits received by the project.","wholeLifeCost":737.26,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 735 to 737. This is primarily due to the following factors‚ The baseline was updated in line with 2024/25 indexation.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ This project does not carry monetised benefits. The project has been paused.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at RED. This is primarily due to the following factors‚ On the 26th of February 2024, the Sellafield Ltd CEO made the decision to bring the Replacement Analytical Project (RAP) to a strategic pause. SL are reviewing the…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","outcomeStatus":"Outcome not established in annual CSV","outcomeEvidence":"The project has no record in the 2025-26 release. The annual CSV does not identify whether it delivered, closed early, was replaced or ceased to meet the portfolio criteria."},{"id":"CO_0014_2122-Q2","year":2025,"name":"National Underground Asset Register (NUAR)","department":"DSIT","category":"Government Transformation and Service Delivery","description":"The National Underground Asset Register (NUAR) is a new digital map of the pipes and cables beneath our feet. The service will improve the efficiency and safety of works and is envisaged to deliver over 4bn of economic growth over 10 years. NUAR is now operated by Ordnance Survey and is live across England, Wales and Northern Ireland. NUAR provides access to data from over 300 organisations, including most of the major energy and water providers, such as Welsh Water, Cadent Gas and UK Power Networks, several major telecommunications companies, including CityFibre and Virgin Media O2, as well as smaller providers of these services, transport organisations and local authorities. The service remains on track to move to Public Beta by spring 2025 and be fully operational by the end of 2025. The legislative updates required to achieve the full benefits of NUAR - giving users the data they need, when they need it - are being progressed through the Data (Use and Access) Bill.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The SRO's Delivery Confidence Assessment rating at 24/25-Q4 remains Amber due to delays in securing Parliamentary time to progress necessary legislative reforms to fully operationalise the service and realise the envisaged benefits of over 400m pa. The required legislative updates are now being progressed through the Data (Use and Access) Bill, which has passed both houses and is currently in consideration of amendments. As such, pending agreement between the houses Royal Assent is on track for summer 2025. Alongside the progress of the legislation, the programme has completed the development and roll out of the service across England, Wales and Northern Ireland and transitioned it to the long-term operator, Ordnance Survey. The requirements to move to Public Beta have been met, and the service is on track to be fully operational by the end of 2025. Engagement has focused on those asset owners whose assets are more critical to planning and executing excavations, as identified by asset owners, with data from over 300 of these organisations now available.","startDate":"2021-08-09","endDate":"2026-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2025 to 31/03/2026. This is primarily due to the following factors‚ The programme competed the development of the NUAR service and transitioned it to the appointed long-term operator by 31/03/25, within the approved schedule. Commitments to move to Public Beta by spring 2025, and to be fully operational by the end of 2025 remain on schedule. The programme has received approval to extend by an additional 12 months to oversee the delivery of Public Beta and Fully Operational commitments, the progression of legislative measures, and to explore, through extensive stakeholder engagement and robust testing, if and how additional benefits could be delivered by increasing access to NUAR data. This funding extension has, in part, been necessitated by fall of the Data Protection and Digital Identity Bill after the general election was called in May 2024. This meant a new Bill was required to pass the NUAR measures through parliament, extending timelines, which is required to full operationalise the service and fully realise the envisaged benefits.","fyBaseline":11.54,"fyForecast":11.16,"fyVariance":3.29,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":42.6,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 35 to 42. This is primarily due to the following factors‚ Funding the continuation of the programme team through the extension period to oversee the delivery of Public Beta and Fully Operational commitments, the progression of legislative measures, and to explore, through extensive stakeholder engagement and robust testing, if and how additional benefits could be delivered by increasing access to NUAR data. The WLC includes a total of £3.3m of contingency funding, secured to protect the service from any disruption or delay to the transition to its long-term operator. The intent remains that these funds will be returned by Q2 if they are not required.","benefits":4832.57,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) decreased from 4914 to 4832. This is primarily due to the following factors‚ Figures have been updated to 2024 prices, in line with figures in the 2024/25 Data (Use and Access) Bill Impact Assessment. This reduces the total benefits from an average of £491m per annum to £483m per annum.","themes":["Cost & funding","Delivery & schedule","Technical & integration","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The SRO's Delivery Confidence Assessment rating at 24/25-Q4 remains Amber due to delays in securing Parliamentary time to progress necessary legislative reforms to…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","outcomeStatus":"Outcome not established in annual CSV","outcomeEvidence":"The project has no record in the 2025-26 release. The annual CSV does not identify whether it delivered, closed early, was replaced or ceased to meet the portfolio criteria."},{"id":"CO_0024_2021-Q2","year":2025,"name":"Civil Service Pensions 2015 Remedy","department":"CO","category":"Government Transformation and Service Delivery","description":"To remove age discrimination within the Civil Service Pension Scheme and remediate impacted member pensions as identified in the 2018 McCloud judgment","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 decreased from AMBER to RED. This is primarily due to the following factors; the current supplier has delivered the majority of the requirements, it is now on track to complete the agreed remaining work within their contract. In the Gate 5 review undertaken in February 2025, the IPA agreed that the residual work should be completed as a separate project (Remedy Project 7) and rated the programme AMBER We have in place a contract change notice with our current suppliers to issue a minimum 44% of the remedial service statements to retired members by 31 March 2025 and to have processed all returned member decisions received up to 30 October by 28 November (final payroll run before transition to Capita)","startDate":"2020-05-20","endDate":"2024-06-30","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 changed from 30/07/2024 to 30/06/2025. This is primarily due to the following factors; the original programme closure date was predicated on the associated legislation being in place in 2022. The scheme regulations needed to remediate members did not come into force until 1 October 2023 which gave schemes 18 months to provide members with a choice i.e. 31 March 2025. Following our IPA review in February 2024 it was agreed that the Programme should be extended to 30 June 2025 then move to a portfolio delivery for the remaining 4 projects","fyBaseline":11.5,"fyForecast":13.5,"fyVariance":17.39,"varianceNarrative":"The budget has no variance. We received approval from the CO Investment Committee to increase our spend from £36.5M to £50.5M in February 2025","wholeLifeCost":50.5,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 34 to 50. The initial budget as set out in the SOC was £57M. This has been proven to be closer than the reduction estimated at FBC in 2022. The higher costs has been due to a number of factors such as: lack of automation necessitating more manual interventions, complexity of member accounts as we need to rebuild alternative benefit calculations and data issues","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is a legally required rectification programme with no tangible benefits","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 decreased from AMBER to RED. This is primarily due to the following factors; the current supplier has delivered the majority of the requirements, it is now on track to complete the agreed remaining work within their contract. In the…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","outcomeStatus":"Outcome not established in annual CSV","outcomeEvidence":"The project has no record in the 2025-26 release. The annual CSV does not identify whether it delivered, closed early, was replaced or ceased to meet the portfolio criteria."},{"id":"CO_0025_2021-Q3","year":2025,"name":"ELECTORAL INTEGRITY PROGRAMME","department":"MHCLG","category":"Government Transformation and Service Delivery","description":"The Electoral Integrity Programme delivered the electoral reforms set through the Elections Act 2022 including improvements to voter identification, easier overseas elector voting and removal of the 15-year limit on overseas elector voting rights, and improved election security. The measures were deployed sequentially, with all of the electoral measures coming into force and implemented prior to the July 2024 UK Parliamentary General Election (UKPGE).","ipaDca":"Green","sroDca":null,"deliveryConfidence":"Green","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors The primary objective of the programme to deliver the relevant commitments in the government’s 2019 manifesto, and the provisions of the Elections Act 2022 had been achieved. The programme’s leadership was identified as a source of strength, In particular, as the Senior Responsible Owner was valued by the wider programme community for changing the programme’s approach and the adoption of a far more collegiate approach to programme delivery. The manner and breadth of the programme’s engagement with its stakeholders was maintained, ensuring the programme was appropriately informed by a range of views and built bridges that aided delivery.","startDate":"2017-01-11","endDate":null,"scheduleNarrative":"Compared to the financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2025. This is primarily due to the following factors‚ The programme delivered the changes arising from the new legislation for use in elections held in May 2024 and July 2024. The programme continued through to March 2025, to support the deployment of EU citizens voting and candidacy rights and monitor the realisation of its outcomes following deployment.","fyBaseline":37.92,"fyForecast":36.38,"fyVariance":4.04,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":388.0,"costNarrative":"Compared to the financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 420 to 388. This is primarily due to the following factors‚ Whole life costs are lower than initially anticipated due to lower demand for New Burdens funding than originally modelled. Some underspend has also arisen due to programme activity being delayed beyond programme closure. This activity is being managed via business as usual activity and budgets. This consists of a relatively small amount compared to the New Burdens underspend.","benefits":null,"benefitsNarrative":"Compared to the financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ The Programme has no cash releasing benefits. The entirely qualitative benefits cover 4 themes: fraud; trust; participation; and efficiency.","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors The primary objective of the programme to deliver the relevant commitments in the government’s 2019 manifesto, and the provisions of the Elections Act 2022…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","outcomeStatus":"Outcome not established in annual CSV","outcomeEvidence":"The project has no record in the 2025-26 release. The annual CSV does not identify whether it delivered, closed early, was replaced or ceased to meet the portfolio criteria."},{"id":"CO_0029_2021-Q4","year":2025,"name":"WORKPLACE SERVICES TRANSFORMATION PROGRAMME","department":"CO","category":"Government Transformation and Service Delivery","description":"The Workplace Services Transformation Programme has been established to realise the ambition of a transformed workplace experience for all Government Property Agency (GPA) customers (end users) and to ensure better value for our clients (Departments).","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors… The programme is now complete, recommendations made by IPA/NISTA are nearing completion.","startDate":"2020-07-01","endDate":null,"scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 01/07/2024 to 30/04/2025. This is primarily due to the following factors… The programme is now complete, live services have been fully integrated into GPAs daily operations. Programme activity has now ceased.","fyBaseline":94.46,"fyForecast":87.37,"fyVariance":7.5,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors… The competitive bid process generated an annual saving compared to the Should Cost Model utilised in the OBC, with those savings driven mainly form the Hard and Soft FM elements of the contracts.","wholeLifeCost":1059.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 1059. This is primarily due to the following factors… The agreed baseline was set at the OBC stage which was submitted during 2022. The project has subsequently tracked an updated Forecasted WLC at £1,019m, as a result of a more competitive bid process and fully amended for variations agreed following mobilisation of the contracts.","benefits":-31.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at -£31m. This is primarily due to the following factors… The agreed baseline was set at the OBC stage which was submitted during 2022. The project has subsequently tracked an updated Forecasted Benefits at £11m, as a result of a more competitive bid process and fully amended for variations agreed following mobilisation of the contracts.","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors… The programme is now complete, recommendations made by IPA/NISTA are nearing completion. Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","outcomeStatus":"Outcome not established in annual CSV","outcomeEvidence":"The project has no record in the 2025-26 release. The annual CSV does not identify whether it delivered, closed early, was replaced or ceased to meet the portfolio criteria."},{"id":"CO_0133_2223-Q1","year":2025,"name":"Government Hubs and Whitehall Campus Programme","department":"CO","category":"Government Transformation and Service Delivery","description":"The Government Hubs and Whitehall Campus (WHC) programme is transformative, delivering the Government’s priorities: providing a smaller, better and greener public estate; strengthening the UK’s economic recovery from Covid-19; levelling up economic opportunity, maximising productivity and improving value; supporting the government’s ambition to reach net zero carbon emissions; strengthening the Union of the United Kingdom","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The Government Hubs and Whitehall Campus programme remains Amber in line with the IPA rating given in July 2024. In the period the Programme has delivered a further two government hubs in Croydon, 2 Ruskin Square and London, 22 Whitehall plus a project previously within the programme is now a GMPP in its own right. Since the last IPA Review the programme has successfully addressed recommendations including reviewing ways of working with strategic partners and greater involvement in cross-government committees. The operating model is under review as part of a wider GPA organisational design review, which along with an accelerated Plan for London and our SR settlement, will inform an updated Business Case to be submitted to CO and HMT","startDate":"2015-05-01","endDate":"2030-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2030. This is primarily due to the following factors‚ The GPA Government Hubs and Whitehall Campus Programme will support the Government’s Strategic requirements to relocate 22,000 Civil Servants out of London and into regional Hubs, and consolidate 53,400 FTE in the Regions by 2030 to promote economic growth","fyBaseline":166.9,"fyForecast":145.56,"fyVariance":12.79,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ Variance due to delays in key projects (Manchester, First ST, Darlington Brunswick St) with costs now falling in future years","wholeLifeCost":558.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 558. This is primarily due to the following factors‚ The baseline costs for the programme remain unchanged pending SR outcomes","benefits":2546.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 2546. This is primarily due to the following factors‚ The baseline benefits for the programme remain unchanged pending SR outcomes","themes":["Cost & funding","Governance & assurance","Approvals & decisions","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The Government Hubs and Whitehall Campus programme remains Amber in line with the IPA rating given in July 2024. In the period the Programme has delivered a further…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","outcomeStatus":"Outcome not established in annual CSV","outcomeEvidence":"The project has no record in the 2025-26 release. The annual CSV does not identify whether it delivered, closed early, was replaced or ceased to meet the portfolio criteria."},{"id":"CO_0210_2223-Q4","year":2025,"name":"ROSA RENEWAL PROJECT","department":"CO","category":"ICT","description":"To avoid obsolescence, enhance resilience and usability and introduce new capabilities to the Rosa shared IT service for HMG working at SECRET.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at GREEN. This is primarily due to the following factors; The Gate 5 review was successfully completed in April 2025. The project was assessed as GREEN. Recommendations from the review are being assessed and will be considered in future BAU planning.","startDate":"2022-04-01","endDate":"2025-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2025. This is primarily due to the following factors‚ RRP successfully closed in line with the agreed baseline of March 2025","fyBaseline":13.6,"fyForecast":13.6,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%. RRP successfully closed in March 2025 and did not exceed a budget variance of more than 5%","wholeLifeCost":51.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 51. This is primarily due to the following factors‚ RRP was delivered within the agreed baseline budget.","benefits":205.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 205. This is primarily due to the following factors‚ RRP met its objective to improve efficiency when working at SECRET by providing more interoperability, more applications, and making Rosa easier to work on. RRP increased the security and resilience of Rosa as a secure place for departments to store and work with their critical and sensitive information. The project scaled Rosa to meet all known demand. It exceeded its financial targets, achieving a 381% ROI, delivering on time and within budget. The final Gate 5 closure review RAG rated RRP GREEN.","themes":["Cost & funding","Governance & assurance","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at GREEN. This is primarily due to the following factors; The Gate 5 review was successfully completed in April 2025. The project was assessed as GREEN. Recommendations from the review are being assessed and will be…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","outcomeStatus":"Outcome not established in annual CSV","outcomeEvidence":"The project has no record in the 2025-26 release. The annual CSV does not identify whether it delivered, closed early, was replaced or ceased to meet the portfolio criteria."},{"id":"CO_0281_2324-Q2","year":2025,"name":"ATS Transformation","department":"CO","category":"Government Transformation and Service Delivery","description":"Government People Group (GPG) needs to replace the existing Civil Service Jobs recruitment platform with a new system that can drive increased efficiencies and improved outcomes after the current supplier contract ends in May 2027. Civil Service Jobs is a highly successful central service with 219 customers enabling HMG to function as one Civil Service in the UK jobs market and maintain strong branding for applicants. Central provision remains the best way the Civil Service can drive value for money for the UK taxpayer. The enhanced functionalities offered by the new Civil Service Jobs will play a significant role in ensuring that a smaller and leaner Civil Service has the right technology in place to enable exceptional recruitment in the most efficient way.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The programme is on a positive trajectory. However, delivering it poses significant challenges due to the diverse range of customers and their complex needs. The development timeline is both challenging and fixed, dictated by the end of the existing contract. Any delays in delivery could diminish the anticipated value of non-cash releasing benefits. While the programme is actively managing a range of risks, the current risk level precludes a green status. To address this, the programme is continuously evaluating resourcing to ensure that the teams possess the necessary capability and capacity. Additionally, there is a strong emphasis on governance to facilitate effective decision-making. The programme continues to undertake NISTA gateway reviews. The gateway 3 review in November 2024 and the gateway 4 review in March 2025 both returned amber ratings.","startDate":"2022-01-01","endDate":"2027-09-30","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 30/09/2027. This is primarily due to the following factors‚ The contract with the current supplier is set to expire on 12 May 2027, and due to commercial constraints and high likelihood of legal challenges from the ATS technology Marketplace, we are unable to extend the current ATS contract beyond the existing extension period in May 2027. The programme aims to begin onboarding customers to the new service in March 2026, with the objective of transferring all departments within the same year. This timeline will facilitate adequate offboarding from the current supplier and ensure a complete data transfer prior to exit. The planned end date also allows for some contingency and provides sufficient time for the handover to live service teams.","fyBaseline":3.54,"fyForecast":3.92,"fyVariance":10.73,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ Following the successful procurement of a supplier in August 2024, it became necessary to extend the standstill period to address questions and ensure full compliance with commercial processes. This extension resulted in a brief delay before the contract could be signed and the supplier onboarded. Consequently, this led to delays in recruiting and onboarding essential skills for the programme, resulting in a lower-than-anticipated resource cost for FY24/25. This underspend will be deferred to FY25/26 to accommodate an adjusted resourcing profile, allowing for the recruitment of additional skills to meet demand. Additionally, costs associated with Welsh Translation and modifications to the existing system have also been lower than forecast for this financial year. Although web hosting costs, costs for User Research, Accessibility Audit and IT Security testing fees have slightly exceeded initial projections, the programme remains on track to complete within its overall budget. Overall, the programme is positioned to meet the full period forecast outlined in the business case through to FY31/32.","wholeLifeCost":42.12,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 43 to 42. This is primarily due to the following factors‚ The Whole Life Costs reported in FY23/24-Q4 were derived from the Outline Business Case (OBC) approved in June 2023, whereas the figures for FY24/25-Q4 were based on the updated and approved Full Business Case (FBC). During the early stages of the procurement process, it became evident that the initial estimates for annual service charges had been overestimated, while the anticipated costs for the implementation phase had been underestimated. Additionally, forecasts for resource costs were revised downwards due to an improved understanding of the roles that the supplier would be providing. These changes were reflected in the updated FBC reported for FY24/25-Q4.","benefits":112.31,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) decreased from 167 to 112. This is primarily due to the following factors‚ The COAB approved the Government People Group Beta/ATS replacement Outline Business Case in June 2023, which outlined £162 million in monetizable benefits over seven years, spanning from FY23-24 to FY29-30. Due to Net present value terms and a 40% optimism bias the total benefits value dropped. At FBC, the monetizable benefits have been remodelled using a more detailed benefits analysis of recent data, actual supplier costs and conservative assumptions. Optimism bias is set to 20% on costs and 30% on benefits. This resulted in the decrease in forecast benefits to £112m.","themes":["Commercial & supply chain","Cost & funding","Workforce & capability","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The programme is on a positive trajectory. However, delivering it poses significant challenges due to the diverse range of customers and their complex needs. The…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","outcomeStatus":"Outcome not established in annual CSV","outcomeEvidence":"The project has no record in the 2025-26 release. The annual CSV does not identify whether it delivered, closed early, was replaced or ceased to meet the portfolio criteria."},{"id":"DCMS_0107_2223-Q1","year":2025,"name":"Open Networks Programme","department":"DSIT","category":"Infrastructure and Construction","description":"The Open Networks Research and Development (R&D) Fund is the £250 million government supported programme to deliver upon the UK’s 5G Supply Chain Diversification Strategy. The Open Networks R&D Fund aims to accelerate the development and deployment of open interface architectures, such as Open RAN, and our ambition to: - Accelerate open-interface products and solutions - ensuring they are truly interoperable, performant, and sustainable – to support our long-term vision for a more open and innovative telecoms market; - Incentivise and de-risk accelerated deployment in the UK - to encourage and accelerate network operators to adopt and deploy open network solutions; - Develop an internationally recognised UK telecoms ecosystem - positioning the UK as a leading global market and focal point for research into open network technology.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at GREEN. This is primarily due to the following factors‚ Positive progress has been seen on final grant claims being submitted, and good attendance at closure events. Most projects remain scheduled for closure by 31 March 2025. A small amount of additional funding has been made available, and a small number of ONP projects have been given a short time extension, an extension to scope, a small amount of additional funding or a combination of these. The programme is due to undergo a Gate 5 Review in June 2025 to review the progress on closure, lessons learned and benefits realisation. Whilst most projects are coming to an end, telecoms and our future networks are as important as ever - we continue to focus on building strong relationships with industry and government stakeholders, through the short extension to the programme, ensuring continuous engagement and collaboration. Additionally, we will work on improving how we communicate the importance of telecoms to senior leaders and ministers, ensuring they understand the critical role it plays in enabling growth and productivity.","startDate":"2021-09-01","endDate":"2025-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2025. This is primarily due to the following factors‚ The majority of projects will close on 31 March 2025. A reduced team will remain in place for a number of months internally to ensure the closure of the programme is well controlled. The team has made a clear closure plan and has communicated positively with projects regarding closure activities and final report requirements. A small number of projects have been extended to ensure the projects can achieve their full range of benefits.","fyBaseline":98.4,"fyForecast":100.5,"fyVariance":2.13,"varianceNarrative":"The budget variance is less than or equal to 5%. The budget variance is less than 5%.","wholeLifeCost":325.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 325. This is primarily due to the following factors‚ The whole life baseline is the same as 24/25 due to the programme being funded by the same multi-year business case. Compared to financial year 23/24-Q4, the programme's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 325.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ Monetised benefits are not captured due to the nature of the programme (R&D funding). Similarly, the timelines for projects makes it difficult to collect monetised benefits, and many qualitative and technical benefits are being collected. In addition, project-level benefits differ from the overarching Business Case benefits.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at GREEN. This is primarily due to the following factors‚ Positive progress has been seen on final grant claims being submitted, and good attendance at closure events. Most projects remain scheduled for closure by 31 March…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","outcomeStatus":"Outcome not established in annual CSV","outcomeEvidence":"The project has no record in the 2025-26 release. The annual CSV does not identify whether it delivered, closed early, was replaced or ceased to meet the portfolio criteria."},{"id":"DEFRA_0016_2122-Q1","year":2025,"name":"BIOSECURITY, BORDERS AND TRADE PROGRAMME","department":"DEFRA","category":"Government Transformation and Service Delivery","description":"The Defra Biosecurity, Borders and Trade Programme (BBTP) vision is to deliver a world-class biosecurity capability which protects health, encourages prosperity and enables security for a global UK. The programme is delivering the key infrastructure, systems, services, operations, capabilities, and legislative changes required to enable the introduction of new controls for goods to and from the EU.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The programme has formally closed with transition and handover successfully complete of the BAU operational delivery unit to the Animal and Plant Health Agency (APHA) and the residual project delivery has been merged with the Northern Ireland Directorate as part of the newly formed single trade delivery programme; Northern Ireland Biosecurity and Trade Programme (NIBTP). At closure the programme has delivered the core elements of the BTOM and now has a network of designated BCPs, new digital services for managing imports, trained inspection staff operating at ports, policy / legislation / processes in place, and has conducted extensive work with stakeholders to embed BTOM controls. The controls put in place are being used to target biosecurity risks based on commodity / country risk profiling, and the value has been demonstrated by robust controls being swiftly introduced in response to EU FMD outbreaks. An IPA Gate 5 review was undertaken in February with an AMBER outcome. The Amber rating relates to uncertainty regarding future BTOM requirements linked to EU reset, with all programme closure activity being viewed as green. The review team commended the programme for the successful delivery to date and highlighted the wider uncertainty around EU reset and alignment and the potential impact for the BTOM. All six recommendations assigned to the programme have been actioned and closed. The programme received Defra Investment Committee approval to formally close the programme in May 2025 and has been formally offboarded from GMPP. The programme has submitted a Spending Review (SR) Phase 2 bid for ongoing borders RDEL and CDEL requirements for HMT review.","startDate":"2021-01-01","endDate":"2025-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2025. This is primarily due to the following factors‚ The programme closed on 31 March 2025 as scheduled.","fyBaseline":122.23,"fyForecast":104.23,"fyVariance":14.73,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The programme was delivered within budget for 24/25 with a slight variance in RDEL spend due to unexpected costs. BBTP has prioritised activity in-year to ensure core BTOM controls were implemented, and efficiency savings have been secured to support the broader departmental position.","wholeLifeCost":null,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 902 to 820. This is primarily due to the following factors‚ The programme’s whole-life cost is £820m.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ The benefits of the programme are primarily qualitative in nature, supported by quantitative analysis and data that inform the assessment of each metric. The principal benefit of the programme, along with the Border Target Operating Model, lies in safeguarding the nation’s biosecurity and ensuring HMG’s compliance with international trade obligations. This protection is critical in mitigating the risk of severe economic disruption caused by biosecurity breaches. The benefits are largely framed as cost avoidance, achieved by preventing the potential economic consequences of a disease outbreak.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The programme has formally closed with transition and handover successfully complete of the BAU operational delivery unit to the Animal and Plant Health Agency (APHA)…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","outcomeStatus":"Outcome not established in annual CSV","outcomeEvidence":"The project has no record in the 2025-26 release. The annual CSV does not identify whether it delivered, closed early, was replaced or ceased to meet the portfolio criteria."},{"id":"DESNZ_0295_2324-Q3","year":2025,"name":"Home Upgrade Grant and Local Authority Delivery (HULA) schemes","department":"DESNZ","category":"Government Transformation and Service Delivery","description":"The HULA Programme comprises Local Authority Delivery and Home Upgrade Grant. The Local Authority Delivery Scheme (LAD) launched in August 2020 and was delivered over the course of three phases. The primary purpose of the funding was to support low-income households living in energy inefficient homes in England with energy efficiency and clean heating upgrades, whilst supporting economic resilience and a green recovery. Phase 1 allocated £200m in grants to over 136 Local Authorities with a managed closedown of projects from March 2022 to end of September 2022. Phase 2 allocated £300m to the five Local Net Zero Hubs, who worked with their regional Local Authorities to continue to deliver energy efficiency upgrades to homes until the end of September 2022. Together LAD phases 1 & 2 delivered upgrades to over 38,000 homes. Phase 3 made almost £287m of extra funding available to Local Authorities, under the Sustainable Warmth competition. Delivery commenced in early 2022 and ended in September 2023. The Home Upgrade Grant (HUG) provides energy efficiency upgrades and low-carbon heating measures to low-income households living in the in the worst-performing, off-gas-grid homes (those rated Energy Performance Certificate (EPC) Band D, E, F and G) in England to tackle fuel poverty and make progress towards net zero 2050. Unlike measure-focused government schemes such as the Great British Insulation Scheme or Boiler Upgrade Scheme, HUG provides whole house retrofit to ensure low-income, off-gas-grid homes receive tailored energy efficient upgrades, treating the entire property. Phase 1 of HUG was worth £218 million. Delivery commenced in early 2022 and ran until September 2023. Phase 2 of HUG was allocated up to £315m. It began delivery in April 2023 and concluded in March 2025, with a small number of households completed under ‘extenuating circumstances’ in May 2025. It is forecast that HUG2 will deliver 11,000 properties, spending £227m of its allocated budget (compared with its Mid-Point Review (MPR) forecast in April 2024 of £217m and 8,721 homes).","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ HULA completed delivery of its LAD schemes in 2023. LAD Phases 1 & 2, which were schemes for retrofit delivery through Local Authorities, concluded with 38,646 homes treated out of an original business case target of 55,000 and received an IPA green rating at closure. LAD Phase 3 completed delivery in September 2023, spending £221m of the £286.8m allocated to Local Authorities (LA) between December 2021 and January 2022. Several factors, including the high degree of optimism bias within LA forecasts, challenges identifying a sufficient pipeline of eligible homes, drop-out rates, cost-cap limitations and short delivery windows led to under-delivery of the LAD scheme, which was also affected by issues relating to supply chain capacity and access to properties resulting from the Covid19 Pandemic. Delivery of HULA’s HUG schemes will cease in September 2025 with the closure of HUG2. HUG1 completed delivery in September 2023, spending £61m of the £218.6m allocated to Local Authorities between Jan-April 2022. Under-delivery of scheme was due to several factors identified through monitoring and evaluation, including organisation level (expertise and capacity of each LA / consortium lead and their delivery partners), project level (ongoing optimism bias within LA forecasts, the time needed for LAs to procure and contract suppliers, the target measure mix’s alignment with local supply chains), and local external factors (customer appetite for measures offered, incidence of qualifying households, some off-gas grid housing stock being unsuitable for measures, and increased difficulty in delivering installations in rural / lower density areas). LAD3 and HUG1 (packaged together as Sustainable Warmth) received an amber/ green rating from IPA at closure. HUG2 has completed 24 months of delivery, issuing £240m against a budget allocation of £315m (GMPP baseline) and a Mid-Point Review forecast of £218m. HUG2, which is delivered via a Delivery Agent and Partner, has faced delivery challenges including identifying properties compliant with restrictive policy criteria (which included limits on private rented sector landlords and a 60% rural ringfence). Performance improved significantly in 24/25 following implementation of a ‘Maximising Delivery Strategy’. Delivery of over 11,000 homes is forecast by scheme-end, against a GMPP baseline of 12,602 and an MPR forecast (April 2024) of 8,721.","startDate":"2020-03-01","endDate":"2025-09-01","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2025 to 01/09/2025. This is primarily due to the following factors: Delivery ended on 30 March 2025. HUG2 project closure activity is underway with the final IPA review expected in September 2025. HULA will exit GMPP with HUG2 at this time and therefore the Q2 report (data date end September 2024 will be the last)","fyBaseline":163.35,"fyForecast":168.04,"fyVariance":2.87,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":1307.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 1307. This is primarily due to the following factors‚ HULA has not re-baselined its Whole Life Cost since the last IPA Annual Report.","benefits":5042.82,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 4782 to 5042. This is primarily due to the following factors‚ The update of the OBR inflation forecast in Q2 24/25, making baseline nominal benefits larger.","themes":["Delivery & schedule","Cost & funding","Commercial & supply chain","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ HULA completed delivery of its LAD schemes in 2023. LAD Phases 1 & 2, which were schemes for retrofit delivery through Local Authorities, concluded with 38,646 homes…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","outcomeStatus":"Outcome not established in annual CSV","outcomeEvidence":"The project has no record in the 2025-26 release. The annual CSV does not identify whether it delivered, closed early, was replaced or ceased to meet the portfolio criteria."},{"id":"DFE_0014_2021-Q2","year":2025,"name":"TEACHER DEVELOPMENT REFORM PROGRAMME","department":"DfE","category":"Government Transformation and Service Delivery","description":"The Teacher Development Reform (TDR) Programme is part of the wider reforms to Teacher Continual Professional Development (CPD) set out in the DfE Teacher Recruitment and Retention Strategy and Chapter 1 of the DfE 'Opportunity for all: strong schools with great teachers for your child’ White Paper published in March 2022. The TDR Programme includes the Early Career Framework (ECF), National Professional Qualifications (NPQ) and National Institute of Teaching (NIoT) projects. These innovations are part of the investment in our teachers and leaders which include a funded two-year induction programme for Early Career Teachers (ECTs) and funded training support and time off timetable for their mentors and Specialist and Leadership NPQs and reforms to our existing Leadership NPQs. Alongside this, The NIoT aims to become England’s flagship teacher training and development provider and will offer exemplary delivery of Initial Teacher Training, ECF and NPQs. It will also draw on and produce cutting-edge research and disseminate best practice to further improve the quality of teacher training nationwide. The driving force behind these reforms is to ensure an excellent teaching profession and ultimately improve pupil outcomes through the Departmental objective to improve teacher quality.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at GREEN. This is primarily due to the following factors, The programme remains on track and is rated Green to reflect our most recent NISTA gateway review, and the closure of key issues on achievement of recruitment targets on the NPQs. Risks remain around securing sufficient funding for providers to remain in market for 2025 and beyond. This risk is being mitigated through a number of management options including (but not limited to) ensuring the future NPQ cohorts are included in the departments spending review, and working with the provider market to assess different options for the future delivery of NPQs, that might secure better economies of scale. The ECF procurement outcomes were announced in January 2025 as part of a package of teacher development updates. The programme is entering its final stages of closure culminating in a NISTA (formerly IPA) Gate 5 review planned for June 2025.","startDate":"2018-11-01","endDate":null,"scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 12/02/2026. This is primarily due to the following factors, The programme is entering its final stages of closure culminating in a NISTA Gate 5 review planned for June 2025, with an expected closure date to follow once a Gate 5 review is complete.","fyBaseline":209.23,"fyForecast":188.39,"fyVariance":9.96,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the programme comprising demand led spend. This has resulted in an underspend against baseline expectation in FY24/25.","wholeLifeCost":940.46,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 750 to 940. This is primarily due to the following factors, The previous baseline forecast concluded at the end of FY24/25. Following business planning activity, forecasts have been updated to incorporate the new budgets.","benefits":169.28,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from £0m to £169m. This is primarily due to the following factors, TDR programme reported benefits of £117m (actuals) in FY23/24 and £169m (actuals) in FY24/25-Q4. The benefits value increased between the two years, primarily as there were additional savings from the area of Teaching School Hubs and a reduction in teacher wastage. There was an error in reporting for the previous financial year. The figure for monetised benefits in FY23/24 should have been £117.5m","themes":["Cost & funding","Governance & assurance","Commercial & supply chain","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at GREEN. This is primarily due to the following factors, The programme remains on track and is rated Green to reflect our most recent NISTA gateway review, and the closure of key issues on achievement of recruitment targets…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","outcomeStatus":"Outcome not established in annual CSV","outcomeEvidence":"The project has no record in the 2025-26 release. The annual CSV does not identify whether it delivered, closed early, was replaced or ceased to meet the portfolio criteria."},{"id":"DFE_0020_2021-Q4","year":2025,"name":"NATIONAL TUTORING PROGRAMME","department":"DfE","category":"Government Transformation and Service Delivery","description":"The National Tutoring Programme (NTP) is a multi-year programme, with the key objective of sustaining a high-quality tutoring market and embedding a culture of schools using tutoring support for their pupils. The programme was established as part of the Department for Education’s Recovery Strategy which aimed to reduce the extent of lost learning caused by disruption from COVID-19","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at GREEN. This is primarily due to the following factors‚ Although the programme closed eight months after the end of NTP delivery in schools, its objectives were met, and this period was largely required for administrative financial reasons.","startDate":"2020-07-01","endDate":"2025-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/07/2024 to 31/03/2025. This is primarily due to the following factors‚ The original project end date reflected the end of the NTP delivery in schools. In order to claw back unused funds from schools and close down, the project continued until 31/03/25.","fyBaseline":66.1,"fyForecast":69.5,"fyVariance":5.14,"varianceNarrative":"The budget variance is less than or equal to 5%. No comment","wholeLifeCost":1125.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 1125. This is primarily due to the following factors‚ This is unchanged from last year.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ This is unchanged from last year – no monetised benefits have been calculated for this programme.","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at GREEN. This is primarily due to the following factors‚ Although the programme closed eight months after the end of NTP delivery in schools, its objectives were met, and this period was largely required for administrative…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","outcomeStatus":"Outcome not established in annual CSV","outcomeEvidence":"The project has no record in the 2025-26 release. The annual CSV does not identify whether it delivered, closed early, was replaced or ceased to meet the portfolio criteria."},{"id":"DFE_0173_2223-Q2","year":2025,"name":"HIGHER TECHNICAL EDUCATION","department":"DfE","category":"Government Transformation and Service Delivery","description":"The decision was made that HTE programme will have delivered the majority of funded activity in its programme business case (PBC) by March 2025, and it is therefore appropriate to move towards to closure of the programme. Instead, resources will be redeployed efficiently, allowing the Department to pivot quickly, and to work in a more agile way, as the new ministerial team's future priorities and ambitions for Level 4/5 and HTQs are emerging. This was agreed with DfE senior leadership, Skills Portfolio, DfE Major Projects, NISTA (formerly IPA), and the HTE Delivery Board. Preparations for programme closure began in early 2025. There had been no response from the sector during the reporting period in response to the early closure of the programme. The uncertainty of the impacts resulting from the early closure influenced the rating for this quarter. During this quarter, the programme was still live and in delivery but moving quickly to prepare for the Gate 5 review, planned for mid-May 2025 (the final delivery confidence rating from that review was green) There has been close working with the Major Projects Team and NISTA to plan for and assemble all the evidence required for closure. In particular, significant work was done in this quarter to shore up the benefits realisation and monitoring plans, reflecting a refresh in programme trajectories, and to review risks, issues, and interdependencies with key stakeholders, ensuring appropriate and sufficient governance would be in place after transition to business-as-usual.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The decision was made that HTE programme will have delivered the majority of funded activity in its programme business case (PBC) by March 2025, and it is therefore appropriate to move towards to closure of the programme. Instead, resources will be redeployed efficiently, allowing the Department to pivot quickly, and to work in a more agile way, as the new ministerial team's future priorities and ambitions for Level 4/5 and HTQs are emerging. This was agreed with DfE senior leadership, Skills Portfolio, DfE Major Projects, NISTA (formerly IPA), and the HTE Delivery Board. Preparations for programme closure began in early 2025. There had been no response from the sector during the reporting period in response to the early closure of the programme. The uncertainty of the impacts resulting from the early closure influenced the rating for this quarter. During this quarter, the programme was still live and in delivery but moving quickly to prepare for the Gate 5 review, planned for mid-May 2025 (the final delivery confidence rating from that review was GREEN)","startDate":"2019-10-01","endDate":null,"scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 decreased from 01/09/2027 to 30/05/2025. This is primarily due to the following factors‚ The programme was set to deliver all funded activity in the programme business case by March 2025. A change in Government meant that the previous policy levers and ministerial ambitions were no longer in place. After the first Spending Review of the new Government, more funds were not made available for new activity not included in the existing business case. Subsequently, it was appropriate to move to close HTE as a programme and redeploy resource to support wider and ongoing work to drive up quality in provision, demand and accessibility at Levels 4 and 5.","fyBaseline":27.9,"fyForecast":4.7,"fyVariance":83.15,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The reduction in budgets is primarily due to the decision not to proceed with the rollout of the Skills Injection Fund 3, as originally planned. This change was formally communicated to our providers in February 2025. Additionally, there were clawbacks from both the Higher Technical Education Growth Fund and Skills Injection Fund 1. These clawbacks were triggered by underperformance against predicted learner numbers and were subject to the performance recovery clause. There was also further clawback from the Higher Technical Education Skills Injection Fund 2, where some providers had not fully spent their allocated funds.","wholeLifeCost":176.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 176. This is primarily due to the following factors‚ This is unchanged from last year.","benefits":null,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ This is unchanged from last year – no monetised benefits have been calculated for this programme.","themes":["Approvals & decisions","Cost & funding","Workforce & capability","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The decision was made that HTE programme will have delivered the majority of funded activity in its programme business case (PBC) by March 2025, and it is therefore…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","outcomeStatus":"Outcome not established in annual CSV","outcomeEvidence":"The project has no record in the 2025-26 release. The annual CSV does not identify whether it delivered, closed early, was replaced or ceased to meet the portfolio criteria."},{"id":"DFT_0020_2122-Q2","year":2025,"name":"RAIL SECTOR TRANSFORMATION PROGRAMME","department":"DfT","category":"Government Transformation and Service Delivery","description":"The Railways Bill, which will be introduced later this session, will enable the biggest overhaul of the rail sector in a generation. It will enable the establishment of GBR as a new ‘directing mind’ for the railways, unifying track and train under a single public body to deliver better services for passengers and freight customers, and better value for money for taxpayers. GBR will have the tools and operational independence it needs to plan and run the rail system on a long-term basis to deliver for passengers. GBR will make long term capacity allocation, planning and investment decisions to give greater certainty to rail freight operators, open access, and the wider supply chain. The legislation will establish a powerful new passenger watchdog to champion improvements in rail services for passengers. It will protect and advocate for passengers’ interests and rights, offer advice, address unresolved passenger complaints and independently monitor service performance reporting on its findings publicly and transparently.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER. This is due to‚ DfT agree with the amber rating. The Railways Bill, which will enable the establishment of Great British Railways is planned to be introduced in the first session of Parliament. The legislation consultation was published on 18 February and closed on 15 April. Significant stakeholder engagement has occurred and to raise awareness of the transformation and build consensus ahead of the Government publishing the consultation response. GBR is expected to be established around 12 months after the bill receives Royal Assent.","startDate":"2024-09-30","endDate":null,"scheduleNarrative":"The project's end-date at 24/25-Q4 is exempted. In February 2025, the government’s consultation on the Railways Bill outlined plans to set up GBR as a new public body, responsible for rail services and infrastructure. The Railways Bill is due to go before Parliament this parliamentary session. GBR is expected to be established round 12 months after the bill receives Royal Assent. Before the bill becomes law, leaders of Network Rail, DfT Operator Limited (DFTO), and the Department for Transport’s (DfT’s) Rail Services Group are working together, as Shadow Great British Railways (SGBR). SGBR will start to realise the benefits of rail reform to passengers and freight ahead of the formal creation of GBR.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","wholeLifeCost":null,"costNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","benefits":null,"benefitsNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","themes":["Delivery & schedule","Cost & funding"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER. This is due to‚ DfT agree with the amber rating. The Railways Bill, which will enable the establishment of Great British Railways is planned to be introduced in the first session of Parliament. The legislation consultation was published on 18 February and…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","outcomeStatus":"Outcome not established in annual CSV","outcomeEvidence":"The project has no record in the 2025-26 release. The annual CSV does not identify whether it delivered, closed early, was replaced or ceased to meet the portfolio criteria."},{"id":"DFT_0034_1920-Q2","year":2025,"name":"A12 CHELMSFORD TO A120 WIDENING","department":"DfT","category":"Infrastructure and Construction","description":"As announced in the Roads Investment Strategy 2, the scope includes: Widening the A12 to three lanes between junction 19 (north of Chelmsford) and junction 25 (A120 interchange)","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Though the Court of Appeal has dismissed the legal challenge to the decision to grant the A12 Chelmsford to A120 widening scheme a Development Consent Order and the legal process is now over, the scheme’s progress has been delayed. The A12 widening scheme, alongside other future road projects, will be considered as part of the government’s Spending Review.","startDate":"2015-04-01","endDate":null,"scheduleNarrative":"Though the Court of Appeal has dismissed the legal challenge to the decision to grant the A12 Chelmsford to A120 widening scheme a Development Consent Order and the legal process is now over, the scheme’s progress has been delayed. The A12 widening scheme, alongside other future road projects, will be considered as part of the government’s Spending Review.","fyBaseline":40.5,"fyForecast":12.74,"fyVariance":68.54,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ Though the Court of Appeal has dismissed the legal challenge to the decision to grant the A12 Chelmsford to A120 widening scheme a Development Consent Order and the legal process is now over, the scheme’s progress has been delayed. The A12 widening scheme, alongside other future road projects, will be considered as part of the government’s Spending Review.","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Section 43 - Commercial interests","themes":["Approvals & decisions","Delivery & schedule","Governance & assurance","Cost & funding"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Though the Court of Appeal has dismissed the legal challenge to the decision to grant the A12 Chelmsford to A120 widening scheme a Development Consent Order and the…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","outcomeStatus":"Outcome not established in annual CSV","outcomeEvidence":"The project has no record in the 2025-26 release. The annual CSV does not identify whether it delivered, closed early, was replaced or ceased to meet the portfolio criteria."},{"id":"DFT_0039_2122-Q3","year":2025,"name":"Midland Main Line Electrification (MMLE) Programme","department":"DfT","category":"Infrastructure and Construction","description":"Electrification of the Midland Main Line from Wigston to Sheffield and Nottingham that will enable the replacement of diesel traction with electric or bimode electric trains delivering environmental improvements and operational cost savings.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The progression of electrification will be dependent on the development of a robust business case that sets out a clear narrative on the rationale to progress the programme. Successful delivery of the programme remains feasible although funding is subject to the outcome of the 2025 Spending Review.","startDate":"2022-01-21","endDate":"2032-12-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/12/2032. This is primarily due to the following factors‚ If MMLE is funded in the 2025 Spending Review, the schedule will be reviewed by Network Rail, and milestones rebaselined as required. It is not known if this will result in a change to the programme end date.","fyBaseline":41.0,"fyForecast":31.0,"fyVariance":24.39,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The forecast costs reflect the latest assured cost plan received from Network Rail, compared to the costs approved in the OBC. As the investment decision for the FBC has been delayed due to Spending Review uncertainty, the approved costs and forecast costs have not been updated.","wholeLifeCost":1468.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 1468. This is primarily due to the following factors‚ Due to changes in the procurement timeline and Spending Review uncertainty, the planned investment decision was deferred to 25/26 and the FBC was not finalised and approved during 24/25.","benefits":2599.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 2599. This is primarily due to the following factors‚ Due to changes in the procurement timeline and Spending Review uncertainty, the planned investment decision was deferred to 25/26 and the FBC was not finalised and approved during 24/25.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The progression of electrification will be dependent on the development of a robust business case that sets out a clear narrative on the rationale to progress the…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","outcomeStatus":"Outcome not established in annual CSV","outcomeEvidence":"The project has no record in the 2025-26 release. The annual CSV does not identify whether it delivered, closed early, was replaced or ceased to meet the portfolio criteria."},{"id":"DFT_0054_2122-Q1","year":2025,"name":"RAPID CHARGING FUND","department":"DfT","category":"Infrastructure and Construction","description":"The Rapid Charging Fund will upgrade power capacity on the Strategic Road Network where it is not commercially viable to do so, in order to allow the private sector to expand ultra rapid electric vehicle charging ahead of need.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Section 22 - Information intended for future publication","startDate":"2020-11-25","endDate":"2028-04-30","scheduleNarrative":"Section 22 - Information intended for future publication","fyBaseline":33.0,"fyForecast":4.5,"fyVariance":86.36,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ Assessment of Rapid Charging Fund pilot applications and engagement with applicants continued throughout 2024. The reduction in spending compared to the baseline occurred because no grant awards were made before the end of the 2024/25 financial year.","wholeLifeCost":null,"costNarrative":"Section 35 - Formulation of government policy","benefits":null,"benefitsNarrative":"Section 35 - Formulation of government policy","themes":["Cost & funding"],"evidenceExcerpt":"Section 22 - Information intended for future publication Section 22 - Information intended for future publication","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","outcomeStatus":"Outcome not established in annual CSV","outcomeEvidence":"The project has no record in the 2025-26 release. The annual CSV does not identify whether it delivered, closed early, was replaced or ceased to meet the portfolio criteria."},{"id":"DHSC_0096_2122-Q4","year":2025,"name":"DIGITISING SOCIAL CARE","department":"DHSC","category":"Government Transformation and Service Delivery","description":"The government is harnessing digital technology to transform adult social care: helping people to stay independent in their homes, joining up services and improving the quality of care provided. Over the last 3 years, the Department of Health and Social Care and NHS England have made significant progress to digitise the adult social care sector, through the Digitising Social Care (DiSC) programme. Digital social care records have been implemented by 78% of CQC care providers (rolling average from February 2025), improving the quality, safety and personalisation of care. The programme has done the foundational work on care technologies through testing, scaling and evaluating technologies that help people live independently in their own homes for longer.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors‚ the improved coverage of the programme: as of Feb 2025, 78% of CQC registered adult social care providers have a digital social care record, covering 87% of people receiving CQC registered adult social care services. The programme forecasts to achieve 80% in the coming months.","startDate":"2021-04-01","endDate":"2025-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2025. This is primarily due to the following factors‚ The programme is forecasting to achieve 80% adoption in the coming months, therefore the programme is exiting the GMPP and standing up to two successor programmes to continue building on progress and sustainability.","fyBaseline":62.0,"fyForecast":46.0,"fyVariance":25.81,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The programme descoped activity to focus on core objectives.","wholeLifeCost":598.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 598. This is primarily due to the following factors‚ The whole life cost were unchanged from the original economic modelling. They reflect both government costs and cost borne by care providers maintaining and sustaining contracts.","benefits":2952.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 2952. This is primarily due to the following factors‚ The programme validated the original benefit assumption through a time and motion study and identified additional productivity benefits.","themes":["Cost & funding","Delivery & schedule","Technical & integration"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors‚ the improved coverage of the programme: as of Feb 2025, 78% of CQC registered adult social care providers have a digital social care record, covering 87%…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","outcomeStatus":"Outcome not established in annual CSV","outcomeEvidence":"The project has no record in the 2025-26 release. The annual CSV does not identify whether it delivered, closed early, was replaced or ceased to meet the portfolio criteria."},{"id":"DHSC_0253_2324-Q1","year":2025,"name":"DATA FOR RESEARCH AND DEVELOPMENT (R&D)","department":"DHSC","category":"Government Transformation and Service Delivery","description":"The Programme's vision is to by 2025, have a world leading NHS-wide health data research infrastructure that enhances patient care, sustains the NHS and supports innovation, while benefiting the economy through attracting life sciences to work in the UK","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ An action plan was put in place to address recommendations from the last IPA review, the Programme continues to progress against its key high-level activities, drawn from the Gateway review recommendations, Delivery activity for this phase of the Programme is drawing to a close, with focus now looking ahead to 25/26 and transitioning towards a Central Management Entity.","startDate":"2022-01-01","endDate":"2025-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2025. This is primarily due to the following factors‚ ‚ the programme has delivered in line with the timescales in the business case and is due to close before the start of the current GMPP reporting cycle.","fyBaseline":82.91,"fyForecast":75.85,"fyVariance":8.52,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ underspend from NHSE SDE and NHS Digitrials that flowed back to our budget late in the financial year and wider portfolio reprioritisation, which meant some planned expenses did not materialise.","wholeLifeCost":206.34,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 191 to 206. This is primarily due to the following factors‚ an increase in pass-through funding from additional funders to providers that was facilitated by the Data for R&D Programme. This increase in baseline was covered by the Programme Business Case Contingency and Optimism Bias.","benefits":1484.98,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) decreased from 1485 to 1484. This is primarily due to the following factors‚ Benefit reprofiling based on changes in spending and the funding changes for FY 24/25.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ An action plan was put in place to address recommendations from the last IPA review, the Programme continues to progress against its key high-level activities, drawn…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","outcomeStatus":"Outcome not established in annual CSV","outcomeEvidence":"The project has no record in the 2025-26 release. The annual CSV does not identify whether it delivered, closed early, was replaced or ceased to meet the portfolio criteria."},{"id":"DWP_0008_2122-Q2","year":2025,"name":"BUILDING SAFETY REGULATOR","department":"DWP","category":"Government Transformation and Service Delivery","description":"The mandate for a new regulatory model was set out in the Building Safety Act, taking forward the Government’s commitment to fundamental reform of the building safety system: to learn the lessons from the Grenfell Tower fire and remedy the systemic issues identified by Dame Judith Hackitt in her Independent Review of Building Regulations and Fire Safety, published in May 2018. The key objectives of the programme were to:- Drive improvements in regulation of high-rise residential and other buildings in scope of a new, enhanced regulatory regime (HRB function); Establish professional registers and competence standards for registered building inspectors and registered building control approvers (RBCAs, formerly known as Approved Inspectors); Encourage improvements in industry, professionals and tradespeople and building control competence and organisational capability across all buildings (Competence Function); and Improving regulatory oversight of all buildings (Oversight Function). • This is being delivered by HSE (Health and Safety Executive)","ipaDca":"Green","sroDca":null,"deliveryConfidence":"Green","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors‚ The programme achieved all major and legislative milestones as planned delivery to both time and under budget. The transition in to HSE support teams concluded and the programme achieved a GREEN rating from the Gate 5 Operations Review and Benefits Realisation independent assurance review in February 2025.","startDate":"2021-03-01","endDate":null,"scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2025. This is primarily due to the following factors‚ When the project was initially approved, the Building Safety Regulator was scheduled to become operational in FY24-25. This milestone was successfully achieved, and the project transitioned to operational status as planned. This success was made possible by the hard work and commitment of everyone involved, whose dedication ensured the timetable was met.","fyBaseline":909.74,"fyForecast":824.74,"fyVariance":9.34,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The project's costs have been periodically reviewed and influenced by several factors, including resource availability and capacity constraints, both of which have affected the level of cost-recoverable income.","wholeLifeCost":null,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 910 to 909. This is primarily due to the following factors‚ Resource availability and capacity restraints affected spend (both revenue and capital).","benefits":null,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 3601. This is primarily due to the following factors‚ Long term benefits will be realised over multiple decades, evaluation appraisal has now commenced.","themes":["Cost & funding","Delivery & schedule","Workforce & capability","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors‚ The programme achieved all major and legislative milestones as planned delivery to both time and under budget. The transition in to HSE support teams…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","outcomeStatus":"Outcome not established in annual CSV","outcomeEvidence":"The project has no record in the 2025-26 release. The annual CSV does not identify whether it delivered, closed early, was replaced or ceased to meet the portfolio criteria."},{"id":"DWP_0009_1112-Q1","year":2025,"name":"CONTINUING THE MOVE TO UNIVERSAL CREDIT","department":"DWP","category":"Government Transformation and Service Delivery","description":"Universal Credit replaces six separate benefits and tax credits for working age people, bringing together in and out of work systems into one, to make work pay. When fully rolled out it is expected that around 6.5 million households will benefit from Universal Credit. It was legislated for in 2012-13 with national rollout of the UC Full Service completed in December 2018 and scheduled to complete migration of remaining legacy claimants including Employment Support Allowance (ESA) and ESA+ Housing Benefit (HB) claimants by March 2026. UC Programme formally closed 31 March 2025 with oversight of the continued safe delivery of UC transitioning to the newly formed Working Age Services Directorate and accountability for completing all migrations by March 2026 transferring to Director General, Jobs and Careers Service.","ipaDca":"Green","sroDca":null,"deliveryConfidence":"Green","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors. The overall Delivery Confidence Assessment Rating remains Green, reflecting the completion of the 2024/25 migration plan enabling the successful closure of Tax Credits, the positive and sustained progress with exceeding Employment and Support Allowance (ESA) and ESA & Housing Benefit (HB) monthly profiles and agreement to an accelerated profile to support completing all migrations by March 2026. Given the excellent progress, and supported by the IPA Gate 5 Assurance GREEN confidence rating, the Programme was formally closed on 31 March 2025 with oversight of the continued safe delivery of UC transitioning to the newly formed Working Age Services Directorate.","startDate":"2011-11-17","endDate":null,"scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2025. This is primarily due to the following factors. Given the continued excellent progress, including enabling the successful closure of Tax Credits and sustained progress with exceeding remaining monthly profiles, the Programme was formally closed as planned on 31 March 2025.","fyBaseline":2174.07,"fyForecast":2128.51,"fyVariance":2.1,"varianceNarrative":"The budget variance is less than or equal to 5%. No additional narrative as the UC project was within the +/- 5% in year variance tolerance","wholeLifeCost":17305.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 17305. This is primarily due to the following factors, Latest HM Treasury approval point was set in the Full Business Case in December 2022. There has been no variation or amended from this viewpoint","benefits":70638.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 70638. This is primarily due to the following factors, Latest HM Treasury approval point was set in the Full Business Case in December 2022. There has been no variation or amended from this viewpoint","themes":["Delivery & schedule","Cost & funding","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors. The overall Delivery Confidence Assessment Rating remains Green, reflecting the completion of the 2024/25 migration plan enabling the successful closure…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","outcomeStatus":"Outcome not established in annual CSV","outcomeEvidence":"The project has no record in the 2025-26 release. The annual CSV does not identify whether it delivered, closed early, was replaced or ceased to meet the portfolio criteria."},{"id":"FCO_0010_1617-Q3","year":2025,"name":"ECHO 2 PROGRAMME","department":"FCDO","category":"ICT","description":"The ECHO 2 Programme is procuring and managing the transition of new services to replace the expiring ECHO1 contract as well as managing the exit of services under ECHO1. It also encompasses setting up a process and approach for operating a Dynamic Purchasing System and service and support in BAU once sites have moved over to the next generation Wide Area Network that will be managed under a new contractual arrangement with a Network Services Integrator.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors‚ The ECHO2 Programme has a delivery confidence of GREEN, with the Programme having transitioned the capability to Live Service, completed all of its transitions and now closed. The Programme delivered to its requirement, under its allocated FBC budget and to the re-baselined timeline. No exemptions or exceptions are required and as a now closed programme it was recommended by the IPA that it be removed from GMPP governance and removed from GRIP reporting as a result.","startDate":"2015-09-01","endDate":null,"scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 23/01/2025 to 05/03/2025. This is primarily due to the following factors‚ Cutover failures due to equipment failure, low response times, no connectivity and complex sites pushed the timescales to the right","fyBaseline":37.9,"fyForecast":37.9,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":null,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 265.","benefits":null,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 119 to 121. This is primarily due to the following factors‚ benefits due to site closures","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors‚ The ECHO2 Programme has a delivery confidence of GREEN, with the Programme having transitioned the capability to Live Service, completed all of its…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","outcomeStatus":"Outcome not established in annual CSV","outcomeEvidence":"The project has no record in the 2025-26 release. The annual CSV does not identify whether it delivered, closed early, was replaced or ceased to meet the portfolio criteria."},{"id":"HMRC_0029_2021-Q3","year":2025,"name":"TRADER SUPPORT SERVICE","department":"HMRC","category":"Government Transformation and Service Delivery","description":"The Northern Ireland Trader Support Service (TSS) was established to provide a free-to-use service to support traders to meet their obligations under the Northern Ireland Protocol (now Windsor Framework) following the end of the European Union transition period on 31/12/20. The TSS helps traders move goods between Great Britain and Northern Ireland or bring goods into Northern Ireland from outside the United Kingdom.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors‚ The increased rating was due to the fact that TSS has continued to deliver a high-quality service, along with new functionality to deliver the Windsor Framework, and improvements to customer experience and critical business system alignment. TSS will maintain support for traders to complete declarations, including under the new simplified customs processes.","startDate":"2020-06-29","endDate":"2025-06-30","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/12/2024 to 30/06/2025. This is primarily due to the following factors‚ This is due to the fact that we secured agreement to extend TSS for one year to December 2025 in order to maintain support for traders.","fyBaseline":123.6,"fyForecast":88.19,"fyVariance":28.65,"varianceNarrative":"The budget variance exceeds 5%. The budget variance exceeds 5%. The cost of delivering TSS in 24/25 was lower than our baseline due to driving efficiencies and value for money within TSS operations.","wholeLifeCost":711.5,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 630 to 711. This is primarily due to the following factors‚ The project's departmental-agreed baseline Whole Life Cost at 24/25-Q4 increased from £630m to £711m. This is primarily due to the fact that we secured agreement to extend TSS for one year to December 2025 in order to maintain support for traders.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ The Programme is not driven by financial benefit so the monetised benefits at 23/24-Q4 remained at £0m to 24/25-Q4. The benefits are aimed at traders moving goods from Great Britain to Northern Ireland and the service helps them to meet their legal obligations under the Windsor Framework (previously the Northern Ireland Protocol).","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors‚ The increased rating was due to the fact that TSS has continued to deliver a high-quality service, along with new functionality to deliver the Windsor…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","outcomeStatus":"Outcome not established in annual CSV","outcomeEvidence":"The project has no record in the 2025-26 release. The annual CSV does not identify whether it delivered, closed early, was replaced or ceased to meet the portfolio criteria."},{"id":"HMRC_0159_2223-Q2","year":2025,"name":"SINGLE CUSTOMS PLATFORM","department":"HMRC","category":"ICT","description":"Single Customs Platform (SCP) has replaced the legacy 'Customs Handling of Imports Exports and Freight' (CHIEF) customs system with the new Customs Declaration Service (CDS). SCP objectives are to: 1. Transition the CDS into the United Kingdom's (UK) single customs platform 2. Decommission the legacy CHIEF system and its associated services, removing complexity and cost for His Majesty's Revenue and Customs (HMRC) and traders 3. Deliver ongoing critical CDS improvements Enhancements have been carried out over several years in consultation with the border industry. CDS has successfully processed 105 million customs declarations since 2018; and has the flexibility and capacity to grow in line with the Government's ambitious trade plans.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Single Customs Platform (SCP) is currently rated Amber, primarily due to ongoing work to ensure Customs Declaration Service (CDS) can deliver a long term sustainable CDS Service and improved customer experience. An Infrastructure Project Authority (IPA) led review (January 2025); and an Internal Audit review (March 2025) both identified work was required to develop SCP plans to transition and close the programme. SCP is addressing and progressing both review recommendations, in conjunction with an Independent Peer Review planned for June 2025. SCP will report progress.","startDate":"2022-04-04","endDate":"2027-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2025 to 31/03/2027. This is primarily due to the following factors‚ Single Customs Platform (SCP) has identified the need to reframe its programme delivery for a further 2 years, to ensure there is a sustainable Customs Declaration Service (CDS) in place, for the longer term. SCP needs to move from being a largely functional focus, that has existed to date, and create a need to invest in the CDS Service. The programme has performed an extensive prioritisation exercise to target outcome achievement. To transition CDS to Business as Usual the programme needs to increase confidence of the CDS long-term ability to meet future requirements of HMRC, and broader HM Government border operations.","fyBaseline":115.0,"fyForecast":114.9,"fyVariance":0.08,"varianceNarrative":"The budget variance is less than or equal to 5%. The budget variance is less than or equal to 5%.","wholeLifeCost":null,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 309 to 589. This is primarily due to the following factors‚ The updated Whole Life Cost (WLC) figures now include a further two years 2025/2026 and 2026/2027. This will ensure Customs Declaration Service (CDS) delivers for the longer term. This includes: 1. Addressing CDS performance risks 2. Making CDS cheaper to operate and change 3. Deliver functionality that improves customer journeys and removes burdensome workarounds for both customers and HMRC operational teams 4. Increase tax revenue through revenue loss prevention by delivering Postponed VAT Accounting (Full Validation) functionality.","benefits":null,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 56 to 248. This is primarily due to the following factors‚ Single Customs Platform (SCP) benefits as an incremental figure was £56m in quarter 4 2023/2024, increasing to £90m for quarter 4 2024/2025. Benefits increased for SCP in 2024/2025 in the following areas: • Customs Handling of Imports Exports and Freight (CHIEF) Decommissioning benefits • Customs Declaration Service (CDS) enhancements within non-cash releasing benefits for operational areas • The original yield from Postponed VAT Accounting (PVA) The SCP Benefits whole lifecycle remains at £248m.","themes":["Cost & funding","Governance & assurance","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Single Customs Platform (SCP) is currently rated Amber, primarily due to ongoing work to ensure Customs Declaration Service (CDS) can deliver a long term sustainable…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","outcomeStatus":"Outcome not established in annual CSV","outcomeEvidence":"The project has no record in the 2025-26 release. The annual CSV does not identify whether it delivered, closed early, was replaced or ceased to meet the portfolio criteria."},{"id":"HMRC_0291_2324-Q3","year":2025,"name":"VOA Business Systems Transformation (BST) Council Tax","department":"VOA","category":"Government Transformation and Service Delivery","description":"Business Systems Transformation (BST) is the VOA’s digital transformation programme for domestic property valuations. It is redesigning the VOA’s core Council Tax business processes and replacing its outdated and end-of-life core valuation and data IT platforms. It will support greater organisational efficiency and agility, and the ability to respond more flexibly to policy change.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from RED to AMBER. This is primarily due to the following factors‚ Business Systems Transformation (BST) is the VOA’s digital transformation programme for domestic property valuations. It is redesigning the VOA’s core Council Tax business processes and replacing its outdated and end-of-life core valuation and data IT platforms. It will support greater organisational efficiency and agility, and the ability to respond more flexibly to policy change. The programme was rated AMBER in March 2025, reflecting significant progress in the 2025/26 financial year. Following successful progression through HMRC’s Change Advisory Board (CAB) the programme delivered all 14 processes into live, with nine being deployed in Release 1.0 on 23rd January 2025, and a further five on 24th March 2025 in Release 1.1. The programme successfully launched a Local Authority (LA) Portal into Private Beta on 11th March. The 12-week phased rollout to 18 local authorities continues to plan and is receiving positive feedback. The programme will continue to address defects and improve functionality prior to an expected Gate 5 review in 25-26.","startDate":"2019-11-11","endDate":"2025-06-30","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 decreased from 31/03/2026 to 30/06/2025. This is primarily due to the following factors‚ The programme delivery schedule reduced from March 2026 to June 2025, to reflect the removal of Non-Domestic Rates deliverables. A new programme has been established which is now accountable for the scope that was removed from BST.","fyBaseline":36.5,"fyForecast":39.92,"fyVariance":9.37,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The BST programme budget variance was 9.4%, which reflected the programme shifting from a single Q3 go-live to a phased delivery in Q4 24/25.","wholeLifeCost":236.34,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 236. This is primarily due to the following factors‚ WLC will be recalculated accounting for the exclusion of Non-Domestic Rating deliverables ahead of a Gate 5 review.","benefits":273.5,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) decreased from 274 to 273. This is primarily due to the following factors‚ Benefits will be recalculated accounting for the exclusion of non-domestic rating deliverables ahead of a Gate 5 review.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Technical & integration"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from RED to AMBER. This is primarily due to the following factors‚ Business Systems Transformation (BST) is the VOA’s digital transformation programme for domestic property valuations. It is redesigning the VOA’s core…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","outcomeStatus":"Outcome not established in annual CSV","outcomeEvidence":"The project has no record in the 2025-26 release. The annual CSV does not identify whether it delivered, closed early, was replaced or ceased to meet the portfolio criteria."},{"id":"HO_0029_1314-Q4","year":2025,"name":"IMMIGRATION PLATFORM TECHNOLOGIES (IPT)","department":"HO","category":"ICT","description":"The Immigration Platform Technologies (IPT) Programme is delivering the technology and information systems to support the immigration service through delivery of three integrated modern technology services that are cheaper to operate than those they replace. IPT will achieve operational efficiencies, optimise use of data and provide a more modern and streamlined customer journey.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from RED to AMBER. This is primarily due to the following factors‚ The Programme delivered to schedule against the revised programme plan and formally closed on the 15 May 2025.","startDate":"2013-04-01","endDate":null,"scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 27/01/2023 to 15/05/2025. This is primarily due to the following factors‚ Departmental priorities such as the Illegal Migration Act, ETAs (Electronic Travel Authorisation ) and eVisas delayed testing and planned betas across a range of services and slowed down roll-out activity. The Immigration Platform Technologies programme plan was revised and programme closure was scheduled for May 2025. The programme has now completed delivery and closed on the 15 May 2025.","fyBaseline":67.69,"fyForecast":74.44,"fyVariance":9.97,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The programme plan was revised due to Departmental priorities impacting testing and planned betas. This caused an elongation of the programme timelines and required retaining resources for longer.","wholeLifeCost":807.49,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 719 to 807. This is primarily due to the following factors‚ The programme revised the programme plan due to Departmental priorities impacting testing and planned betas. This caused an elongation of the programme timelines and required retaining resources for longer than forecast in the 2022/23 Programme Business Case.","benefits":183.4,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 183. This is primarily due to the following factors‚ IPT realised benefits progressively as it delivered elements of its scope. With the decommissioning of the legacy Case Immigration Database (CID), the programme is now positioned to achieve full benefits realisation.","themes":["Cost & funding","Technical & integration","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from RED to AMBER. This is primarily due to the following factors‚ The Programme delivered to schedule against the revised programme plan and formally closed on the 15 May 2025. Compared to financial year 23/24-Q4, the…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","outcomeStatus":"Outcome not established in annual CSV","outcomeEvidence":"The project has no record in the 2025-26 release. The annual CSV does not identify whether it delivered, closed early, was replaced or ceased to meet the portfolio criteria."},{"id":"HO_0043_2021-Q4","year":2025,"name":"FUTURE SUPPLIERS SERVICES","department":"HO","category":"Government Transformation and Service Delivery","description":"UK Visas & Immigration (UKVI) maintains a network of visa application centres in-country and overseas. These centres allow visa applicants to complete their applications by enrolling biometric information, submitting identity documents and often supplementary evidence to be digitised and sent to UKVI. Overseas the centres also facilitate interviews and allow His Majesty's Passport Office (HMPO) overseas passport applicants to complete their applications. These services were previously outsourced via the Front-End Services UK (FES UK) contract in-country and Next-Generation of Outsourced Visas (NGOV) contracts overseas. The FES UK contract expired on 31st October 2024 and the NGOV contract was extended to 31st March 2025 (from the original expiry of 30st September 2024). The Future Supplier Services (FSS) Programme was established to procure equivalent services for an initial 4-year contract (with scope for a 1+1+1 potential extension) allowing FSS to meet its single primary objective for providing service continuity, whilst enabling interim transformative change in advance of implementing a strategic model. Although the new services to be delivered are similar to the previous provision the key changes are: - The FSS contracts are structured in 5 lots, compared to the previous 3. - The Key Performance Indicators are targeted to address service concerns within previous contracts. - The Financial solution is fundamentally changed to ensure flexibility and value for money as volumes fluctuate (this also shares risk in a more balanced way and supports service continuity). - Increased flexibility to reduce scope and volumes as Home Office (HO) digitisation rolls out resulting in a decrease of customers physically attending Visa Application Centres (VACs).","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors‚ As of 31st March 2025, the majority of delivery was complete with only a few key milestones left to be achieved. Handover to Live Services (including the remaining activities for Bio-Kit Only locations as agreed) and closure activities were on track to complete by the Programme closure date as planned. As of 30th May 2025 the Future Supplier Services Programme has successfully completed delivery and handover, and the Programme formally closed as planned.","startDate":"2020-04-01","endDate":"2025-05-30","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 28/10/2024 to 30/05/2025. This is primarily due to the following factors‚ The conclusion of the Visa and Citizenship Application Service (VCAS) procurement was delayed due to a legal challenge to the procurement outcome by a bidder (which was later dropped). The Programme was expected to award contracts in July 2023, however the legal challenge put a suspension on the contract awards for three of the five contracts. FSS was able to award one contract in August 2023 and was successful in October 2023 in lifting the suspension of award in the remaining contracts. Once all five contracts had been awarded, the Programme worked closely with the new commercial partners at detailed implementation planning and revisited its delivery timelines, shifting Programme closure to March 2025. A Portfolio Change Request in July 2024 included an additional two months of Early Life Support resulting in Programme closure timelines extending to May 2025.","fyBaseline":154.54,"fyForecast":138.55,"fyVariance":10.34,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ Dual running/exit costs have been negotiated down with the Commercial Team. As the Programme is closing and there will be no more change requests, there have been some savings against the budget allocated for change. As there is an underspend, the optimism bias was not required.","wholeLifeCost":528.98,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 423 to 528. This is primarily due to the following factors‚ The majority of this increase is driven by increased customer volumes attributable to Business as Usual (BAU) budgets. The repricing of the deals accordingly has led to a slightly improved unit price given economies of scale. Per the Full Business Case (FBC), all of that spend is volume related and part of BAU budgeting once the Programme has ended. The arrangements are net positive for the department, i.e. as volumes increased, Regulated Fees are greater than the VCAS contracts will cost. A minority of the increase is in implementation Milestone Charges attributable to the Programme budget. These are the charges payable to the new Suppliers and are driven primarily by the uplift in volumes (need for bigger premises etc), and to a lesser extent by the delay due to the procurement challenge, uplift to Security Requirements and other minor changes. The remainder of the increase is a mix of Programme delivery cost and contingency also only attributable to the Programme budget. This is driven by a combination of delay and customer volume, emergent costs (Exit) and a small amount of additional scope in work approved by Programme Board to ensure the benefits set out in the FBC are maximised. The change was approved by the Departmental Investment Committee in October 2024.","benefits":null,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 0 to 172. This is primarily due to the following factors‚ The financial model design, including the banded pricing model, was defined, allowing the Programme to forecast the estimated savings per unit (out of country) compared to the NGOV contracts.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors‚ As of 31st March 2025, the majority of delivery was complete with only a few key milestones left to be achieved. Handover to Live Services (including the remaining activities for Bio-Kit…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","outcomeStatus":"Outcome not established in annual CSV","outcomeEvidence":"The project has no record in the 2025-26 release. The annual CSV does not identify whether it delivered, closed early, was replaced or ceased to meet the portfolio criteria."},{"id":"HO_0044_2021-Q4","year":2025,"name":"PASSPORT TRANSFORMATION PROGRAMME","department":"HO","category":"Government Transformation and Service Delivery","description":"Passports Transformation Programme was initiated in 2016 with a case for change built on significant operational efficiencies, the potential for improved employee engagement and public protection capabilities and a vastly improved customer experience. The ultimate aim was to deliver a modernised, automated and digitisation of the passport service. The services at that time were almost entirely paper based, with failure demand leading to customer frustration and increased costs associated with high levels of customer contact. Infrastructure was built around manual and linear processes, for example, handline and scanning paper applications / evidence. There was minimal use of automation, with work tied to physical locations. Systems were integrated and interconnected resulting in a lack of user focus with no alignment and interoperability with wider Home Office IT systems. The Programme is in its final stages and has delivered a suite of replacement products, including: - The new Digital Application Processing (DAP) system, to replace the legacy Application Management System (AMS). DAP is a workflow management system which automates those decisions that do not require human intervention, and allocates tasks to available members of staff, meaning a more efficient end to end process. - The Digital Customer Services (DCS) online interface which customers use to apply for a passport. - The new Passport Data Services system of record. Cloud-hosted platform to replace the legacy database of passport records. Provides greater resilience and security, and many more opportunities for using data in future. - Replacement of legacy fraud management applications.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Continued AMBER rating reflected the complexity within the Programme left to deliver together with competing dependencies, coupled with the risks to funding in the wider Mission and Borders Portfolio for FY 24/25 (these were mitigated for FY24/25). Next Review (GATE 5 closure) is due June 2025","startDate":"2016-04-01","endDate":null,"scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 30/04/2025 to 31/07/2025. This is primarily due to the following factors‚ Delayed due to increased complexity within the development / testing work and drain down of cases from legacy systems. These have been proactively managed and the Programme has a clear pathway to closure.","fyBaseline":86.12,"fyForecast":85.65,"fyVariance":0.55,"varianceNarrative":"The budget variance is less than or equal to 5%. n/a","wholeLifeCost":1010.06,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 730 to 1010. This is primarily due to the following factors‚ As at the end of 23/24, the cumulative spend was £730m. At end of 24/25 spend was £816m. We now anticipate the Whole Life Cost of the Programme to be approximately £1bn – noting that this includes: - The cost of running all the digital services until 2032, taking into account increased cost forecasts - The remaining change funding required to complete the Programme - Optimism bias of 50% on BAU run costs; this includes VAT where applicable and inflation for 25/26 and beyond at 2% As part of Programme closure further review will take place and be reported at Q1","benefits":82.79,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) decreased from 230 to 82. This is primarily due to the following factors‚ Reporting has been updated and refreshed to account for banked benefits (2019).","themes":["Cost & funding","Governance & assurance","Technical & integration","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Continued AMBER rating reflected the complexity within the Programme left to deliver together with competing dependencies, coupled with the risks to funding in the…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","outcomeStatus":"Outcome not established in annual CSV","outcomeEvidence":"The project has no record in the 2025-26 release. The annual CSV does not identify whether it delivered, closed early, was replaced or ceased to meet the portfolio criteria."},{"id":"HO_0229_2223-Q4","year":2025,"name":"Fraud Reform","department":"HO","category":"Government Transformation and Service Delivery","description":"To combat the growing threat of fraud to the public and economy, the 'then' government launched a Fraud Strategy (May 2023). The vision of the strategy was to cut fraud 10% from 2019 levels: the vision was achieved. Published crime data 4 successive quarters showed fraud had exceeded the 10% target, reaching a 17% reduction in data published for year ending December 2023. The programme was closed by the Home Office in March 2025.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at GREEN. This is primarily due to the following factors‚ An external assurance review was carried out on the programme in March 2025 and reviewers assessed the programme to be GREEN for overall delivery confidence and GREEN to progress to the next stage gate (closure).","startDate":"2022-04-01","endDate":"2025-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2025. This is primarily due to the following factors‚ The programme formally closed on 31/03/2025.","fyBaseline":31.2,"fyForecast":31.8,"fyVariance":1.92,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":431.4,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 320 to 431. This is primarily due to the following factors‚ (1) Revised cost assumptions. We have collaborated closely with law enforcement partners to refine our understanding of the requirement to maintain the programme's target deliverables in future years, including increases to recruitment and employment costs over recent years. (2) Revised cost estimates now includes annual provision for the national Stop! Think Fraud communications campaign, in line with ministerial ambition.","benefits":1282.02,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 0 to 1282. This is primarily due to the following factors‚ The vision of the Fraud Strategy was to cut fraud 10% from 2019 levels, down to 3.33million frauds by the end of the last Parliament (30 May 2024): the vision was achieved. Published crime data 4 successive quarters showed fraud had exceeded the 10% target, reaching a 17% reduction in data published for year ending December 2023. The programme has realised £54.31m of monetised benefits between FY22/23 and FY24/25. The programme is forecast to generate over £2,703.3million of present social value of benefits against an overall present social value of costs of £483million over the appraisal period of 10-years.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at GREEN. This is primarily due to the following factors‚ An external assurance review was carried out on the programme in March 2025 and reviewers assessed the programme to be GREEN for overall delivery confidence and GREEN…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","outcomeStatus":"Outcome not established in annual CSV","outcomeEvidence":"The project has no record in the 2025-26 release. The annual CSV does not identify whether it delivered, closed early, was replaced or ceased to meet the portfolio criteria."},{"id":"HO_0285_2324-Q2","year":2025,"name":"MANSTON TRANSFORMATION PROGRAMME","department":"HO","category":"Government Transformation and Service Delivery","description":"Manston Transformation Programme will transform the temporary infrastructure, utilities and facilities which are not sustainable in the long term and design/build new infrastructure at the Manston Site. Additionally, new Operator/Healthcare service contracts will be procured to reduce the number of contracts, streamline processes and save on costs.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 changed from RED to AMBER. This is primarily due to the following factors‚ Due to the change in government, during the financial year 24/25, the programme paused the original scope of work to consider alternative value for money options. A Ministerial steer and decision was received to move forward with a revised scope and extensive work has taken place to pivot the programme. Designs, requirements and the delivery timeline has been revisited and validated and as a result the programme has now been re-baselined and the current delivery confidence assessment has changed to Amber for Q1 reporting.","startDate":"2023-01-31","endDate":"2029-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 05/11/2027 to 31/03/2029. This is primarily due to the following factors‚ Due to the change in Government, this financial year, the Programme paused and revisited the scope and requirements from a value for money perspective. A Ministerial steer and decision was given to move forward with the revised scope and since then work has taken place to pivot the Programme. Design requirements and plans have been revisited and the delivery schedule has been re-baselined.","fyBaseline":12.91,"fyForecast":11.04,"fyVariance":14.48,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ Due to the change in government, during the financial year 24/25, the programme paused the original scope of work to consider alternative value for money options. A Ministerial steer and decision was received to move forward with a revised scope and extensive work has taken place to pivot the programme. Designs, requirements and the delivery timeline has been revisited and validated and as a result the programme has now been re-baselined.","wholeLifeCost":987.31,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 2713 to 987. This is primarily due to the following factors‚ Due to the change in government, during the financial year 24/25, the programme paused the original scope of work to consider alternative value for money options. A Ministerial steer and decision was received to move forward with a revised scope and extensive work has taken place to pivot the programme. Designs, requirements and the delivery timeline has been revisited and validated and as a result the programme has now been re-baselined.","benefits":62.1,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 0 to 62. This is primarily due to the following factors‚ Over the last 12 months benefits analysis has been carried out to identify, quantify and evaluate the benefits the Programme is expected to deliver.","themes":["Cost & funding","Scope & requirements","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 changed from RED to AMBER. This is primarily due to the following factors‚ Due to the change in government, during the financial year 24/25, the programme paused the original scope of work to consider alternative value for money…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","outcomeStatus":"Outcome not established in annual CSV","outcomeEvidence":"The project has no record in the 2025-26 release. The annual CSV does not identify whether it delivered, closed early, was replaced or ceased to meet the portfolio criteria."},{"id":"MHCLG_0007_2122-Q1","year":2025,"name":"Towns Fund","department":"MHCLG","category":"Infrastructure and Construction","description":"The Towns Fund was established as a £3.6bn funding pot that would invest in town centres and high streets in England to build stronger, and more resilient local economies. The Towns Fund has two major components: Town Deals (£2.35bn, 101 places) and the Future High Streets Fund competition (FHSF) (£830m, 72 places). Any money that was not allocated towards successful recipients of either programme has been used to support work that is closely aligned with the outcomes of the fund. Including funding allocated to the Levelling Up Fund, the ‘Build Back Better’ initiative, Freeports and DCMS-led heritage high street regeneration programmes.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Rating remains Amber with improvement in activity and spend across the programme. Analysis of data has shown some slippage and delays. In response, approval has been granted for extensions on Town Deals and Future High Street Fund (FHSF). Town Deals has been extended to March 2027. FHSF was extended to March 2025 for places with exceptional need; and a further six-month grace period for a small number of places at risk of missing the deadline. The programme team is supporting Local Authorities and acting as a critical friend through the delivery phase, in response to the reduction in Area Lead time spent on in-flight funds and the closing of the Delivery Associate Network.","startDate":"2018-12-01","endDate":null,"scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 30/03/2026 to 31/03/2027. This is primarily due to the following factors‚ The October 2024 Spending Review has granted an additional year for Town Deals, taking the end of the programme to March 2027. There is no new money for the programme but the additional year allows for payments to be scheduled in 26/27. In September, ministers agreed a further extension to the FHSF, taking the programme to 31 March 2025.","fyBaseline":556.4,"fyForecast":516.3,"fyVariance":7.21,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The programme had an underspend in 24/25. For Town Deals we released 92% of our budget and therefore the variance level is 8%. This was due to a range of factors but mainly due to an optimism bias at local authority level.","wholeLifeCost":3106.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 3106. This is primarily due to the following factors‚ The whole life cost figure relates to the costs published in the business case. This will remain unchanged for GMPP reporting, although costs may fluctuate in terms of grant repayment, overprogramming or a range of other potential issues the baseline costs will remain as are.","benefits":7594.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) decreased from 9878 to 7594. This is primarily due to the following factors‚ The Town Deals and FHSF FBC economic cases set out illustrative benefits and were based on BCRs from past interventions. The re-calculation now uses project intervention type received through performance monitoring, and average BCRs submitted by local authorities, to revise the projected benefits for the entire Towns Fund programme.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Rating remains Amber with improvement in activity and spend across the programme. Analysis of data has shown some slippage and delays. In response, approval has been…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","outcomeStatus":"Outcome not established in annual CSV","outcomeEvidence":"The project has no record in the 2025-26 release. The annual CSV does not identify whether it delivered, closed early, was replaced or ceased to meet the portfolio criteria."},{"id":"MHCLG_0017_2122-Q2","year":2025,"name":"Levelling Up Fund","department":"MHCLG","category":"Infrastructure and Construction","description":"The Levelling Up Fund is a £4.8 billion competitive fund allocated across three rounds, open to bids from all local authorities in the UK as well as certain public sector and other bodies in Northern Ireland. This brings allocation of all £4.8 billion of LUF funding to completion. The capital-only fund will provide grant payments to successful bidders to support town centre & high street regeneration, transport and cultural & heritage bids / projects.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Round 3 of the Fund was preserved in the 2024 Autumn Statement and agreed a reprofiling of c £1bn for projects beyond March 2026. All funding allocations are complete. LUF continues to implement NISTA recommendations in regards to aligning governance, monitoring returns and evaluation approach to the consolidation and simplification of funds as part of the devolution agenda. This will ensure the continued support and development of projects aligned to the Government's agenda, to deliver the programmes long-term benefits.","startDate":"2021-03-03","endDate":"2028-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2026 to 31/03/2028. This is primarily due to the following factors‚ Autumn Statement 2024 agreed a reprofiling of c£1.bn for LUF projects beyond March 2026. Through the latest monitoring return, we allowed projects for the first time to extend spending profiles to 2027 for Round 1 projects and 2028 for Round 2 and 3 projects. These profiles (with optimism bias applied) have informed funding profiles for Spending Review phase 2.","fyBaseline":1064.0,"fyForecast":1020.0,"fyVariance":4.14,"varianceNarrative":"The budget variance is less than 5%.","wholeLifeCost":4799.75,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 4800. This is primarily due to the following factors‚ Whole Life Costs have not changed. The full £4.8 billion of the programme’s budget has been allocated.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) has remained at 0. This is primarily due to the following factors‚ Now that all beneficiaries are known, analysis is underway to identify the monetised benefits of the programme e.g. BCR.","themes":["Cost & funding","Governance & assurance","Approvals & decisions","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Round 3 of the Fund was preserved in the 2024 Autumn Statement and agreed a reprofiling of c £1bn for projects beyond March 2026. All funding allocations are…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","outcomeStatus":"Outcome not established in annual CSV","outcomeEvidence":"The project has no record in the 2025-26 release. The annual CSV does not identify whether it delivered, closed early, was replaced or ceased to meet the portfolio criteria."},{"id":"MOD_0001_1112-Q1","year":2025,"name":"A400M","department":"MoD","category":"Military Capability","description":"To deliver into RAF Service a worldwide, protected Tactical Air Transport capability that is able to rapidly project, sustain and recover Air and Joint Forces, in order to meet UK standing commitments and support enduring and contingent operations in the most demanding timescales. A400M refers to the overarching programme, the aircraft operated by the RAF is named the Atlas.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. Although Delivery Confidence has remained at Amber, with the Development and Production Phase (DPP) final Standard Operating Capability now on contract, delivery confidence is greater. The A400M DPP Review Note will reset the delivery schedule for the remaining projects (noting all 22 aircraft have been delivered) which will enable ‘Green’ to be reported. The main risk to delivery remains workforce capacity which the Programme continues to mitigate through Project prioritisation to smooth resource demands.","startDate":"1997-07-01","endDate":"2028-12-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2025 to 31/12/2028. This is primarily due to the following factors. Confidence has increased with the signing of the Global Deal with all Partner Nations (through the Organisation for Joint Armament Co-operation) and Airbus. The 2025 Review Note will reflect the revised schedule to achieve Full Operating Capability based on the contract.","fyBaseline":348.18,"fyForecast":300.93,"fyVariance":13.57,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. In-Year re-profiling.","wholeLifeCost":4111.81,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 3764 to 4111. This is primarily due to the following factors. Confirmation of the support costs with the signing of the Global Deal.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Delivery & schedule","Cost & funding","Workforce & capability","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. Although Delivery Confidence has remained at Amber, with the Development and Production Phase (DPP) final Standard Operating Capability now on contract, delivery confidence is greater. The A400M DPP…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","outcomeStatus":"Outcome not established in annual CSV","outcomeEvidence":"The project has no record in the 2025-26 release. The annual CSV does not identify whether it delivered, closed early, was replaced or ceased to meet the portfolio criteria."},{"id":"MOD_0017_1112-Q1","year":2025,"name":"CROWSNEST PROGRAMME","department":"MoD","category":"Military Capability","description":"The Crowsnest programme is a firm price contract to deliver an organic Airborne Surveillance and Control (ASaC) capability as role fit to the Merlin Mark 2 helicopter. By delivering concurrent Land, Sea and Air surveillance and control for Carrier Strike, Littoral Manoeuvre and Land, it will provide force protection, intelligence and support to strike assets. It is part of the Carrier Enabled Power Projection programme with Queen Elizabeth Class Carriers and the F-35B Lightning II.","ipaDca":"Green","sroDca":null,"deliveryConfidence":"Green","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors. The programme having achieved Full Operating Capability in March 2025, and remaining within cost, time and performance approvals.","startDate":"2013-03-26","endDate":"2025-08-06","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 06/08/2025. This is primarily due to the following factors. The inclusion of acceptance and contract closure activity. Full Operating Capability was achieved 29 March 2025. These factors have been under review to identify opportunities to bring the programme closure earlier.","fyBaseline":4.78,"fyForecast":1.08,"fyVariance":77.4,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The programme is £3.7m under-spent against the funds allocated for Financial Year 2024/2025 due to a Ministry of Defence directed deferral to 2025/2026. This funding is allocated for change requests and spares purchases. The remaining in year programme spend is within the revised budget allocation.","wholeLifeCost":507.71,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 504 to 507. This is primarily due to the following factors. Whole life costs have changed due to a MOD directed funding deferral from Financial Year 2024/2025 to FY 2025/2026.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Workforce & capability","Commercial & supply chain","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors. The programme having achieved Full Operating Capability in March 2025, and remaining within cost, time and performance approvals. Compared to financial year 23/24-Q4, the project's end-date…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","outcomeStatus":"Outcome not established in annual CSV","outcomeEvidence":"The project has no record in the 2025-26 release. The annual CSV does not identify whether it delivered, closed early, was replaced or ceased to meet the portfolio criteria."},{"id":"MOD_0138_2122-Q1","year":2025,"name":"SEA VENOM","department":"MoD","category":"Military Capability","description":"Future Anti-Surface Guided Weapon (FASGW) is required to enable the Wildcat maritime helicopter to deliver kinetic effect against; and defeat difficult targets in the complex littoral and maritime environments; that lie outside the capabilities of other anti-ship weapon systems.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors. The Delivery Confidence Assessment has increased to Green against the programme's re-baselined schedule and costs. The first live firing of the weapon from the Wildcat helicopter was completed successfully in October 2024 and the capability will be deployed operationally on Carrier Strike Group 2025.","startDate":"2014-03-03","endDate":"2029-12-21","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 21/12/2029. This is primarily due to the following factors. The programme end date has been maintained.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 43 - Commercial interests","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits","themes":["Delivery & schedule","Commercial & supply chain","Cost & funding","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors. The Delivery Confidence Assessment has increased to Green against the programme's re-baselined schedule and costs. The first live firing of the weapon from the Wildcat helicopter was…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","outcomeStatus":"Outcome not established in annual CSV","outcomeEvidence":"The project has no record in the 2025-26 release. The annual CSV does not identify whether it delivered, closed early, was replaced or ceased to meet the portfolio criteria."},{"id":"MOD_0142_2122-Q1","year":2025,"name":"MARTLET","department":"MoD","category":"Military Capability","description":"The Future Anti-Surface Guided Weapon is required to enable Wildcat helicopter to deliver kinetic effect against and defeat difficult targets in the complex littoral and maritime environments; that lie outside the capabilities of other anti-ship weapon systems.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at GREEN. This is primarily due to the following factors. Martlet has achieved its Initial Operating Capability. It has moved into regular use with contracted in-service support and achievement of Full Operating Capability is on target to be achieved in Summer 2025.","startDate":"2011-04-30","endDate":"2025-12-19","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 19/12/2025. This is primarily due to the following factors. Full Operating Capability is on target to be achieved in summer 2025. The programme end date has been maintained compared to 12 months ago.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 43 - Commercial interests","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits","themes":["Workforce & capability","Commercial & supply chain","Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at GREEN. This is primarily due to the following factors. Martlet has achieved its Initial Operating Capability. It has moved into regular use with contracted in-service support and achievement of Full Operating Capability is on target to be achieved in…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","outcomeStatus":"Outcome not established in annual CSV","outcomeEvidence":"The project has no record in the 2025-26 release. The annual CSV does not identify whether it delivered, closed early, was replaced or ceased to meet the portfolio criteria."},{"id":"MOD_0143_2122-Q1","year":2025,"name":"METEOR","department":"MoD","category":"Military Capability","description":"This programme aims to achieve sustainment of a world beating Beyond Visual Range Air to Air Missile (BVRAAM) capability with our Meteor Partners (FRA, GE, SP, IT and SWE) to share cost and reap the benefits from competing in the global BVRAAM export market.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. This project is AMBER because of uncertainty on the scale and shape of any future Meteor development, and the challenges of reaching consensus on the development path for Meteor across all six partner nations. Timescales for Meteor Lightning II integration remains uncertain due to dependency on the Lightning II programme's timeline. Improvements are being made with In-Service Support and missile availability.","startDate":"2002-07-15","endDate":"2048-12-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/12/2033 to 31/12/2048. This is primarily due to the following factors. This programme is due on 31/12/2033 which, based on the current schedule, is when the first upgraded Meteor missiles will be delivered to the UK and enter into service. The programme schedule, and end date, are subject to change during 2025 as Partner Nations aim to reach a consensus on the development path for Meteor.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 43 - Commercial interests","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits","themes":["Delivery & schedule","Commercial & supply chain","Cost & funding","Technical & integration"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. This project is AMBER because of uncertainty on the scale and shape of any future Meteor development, and the challenges of reaching consensus on the development path for Meteor across all six partner…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","outcomeStatus":"Outcome not established in annual CSV","outcomeEvidence":"The project has no record in the 2025-26 release. The annual CSV does not identify whether it delivered, closed early, was replaced or ceased to meet the portfolio criteria."},{"id":"MOJ_0028_1314-Q2","year":2025,"name":"HMCTS Reform","department":"MoJ","category":"Government Transformation and Service Delivery","description":"The HMCTS Reform Programme aims to improve the accessibility and efficiency of the justice system. The programme is centred on the principle that the system should be designed around its users, the programme will make our courts much better to use, easier to run, and cheaper to operate.","ipaDca":"Green","sroDca":null,"deliveryConfidence":"Green","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors‚ The programme has completed delivery and is undertaking formal closure.","startDate":"2016-12-01","endDate":"2025-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2025. This is primarily due to the following factors‚ The programme has completed delivery and is undertaking formal closure.","fyBaseline":35.26,"fyForecast":35.58,"fyVariance":0.91,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":1228.61,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 2789 to 1228. This is primarily due to the following factors‚ Whole Life Cost have reduced following programme rescoping and total recurring costs of HMCTS’ reformed operating model (baseline value £1,498m) have been removed as these are counted as disbenefits.","benefits":2479.5,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) decreased from 2899 to 2479. This is primarily due to the following factors‚ In line with a reduction in Whole Life Cost following programme rescoping, the benefits were reprofiled. HMCTS’ reformed operating model costs (baseline value £1,498m) are included as disbenefits.","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors‚ The programme has completed delivery and is undertaking formal closure. Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","outcomeStatus":"Outcome not established in annual CSV","outcomeEvidence":"The project has no record in the 2025-26 release. The annual CSV does not identify whether it delivered, closed early, was replaced or ceased to meet the portfolio criteria."},{"id":"MOJ_0073_2122-Q4","year":2025,"name":"Drug Testing Services","department":"MoJ","category":"Government Transformation and Service Delivery","description":"The project objective is to successfully procure and implement a service for the drug testing of offenders in prisons and under supervision in the community. It aims to procure services that are future-proof and support delivery of the drug testing strategy. Two contracts are to be procured 1) urine and oral fluid-based laboratory analysis services, and (2) oral fluid point of care drug testing kits.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Ongoing implementation risks.","startDate":"2021-04-01","endDate":"2025-10-08","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 08/10/2025. This is primarily due to the following factors‚ The project is on track to deliver against the baseline schedule.","fyBaseline":1.1,"fyForecast":1.0,"fyVariance":9.09,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ Reduced project resources than forecast.","wholeLifeCost":58.6,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 184 to 58. This is primarily due to the following factors‚ Significant reductions from reduced unit prices of drug testing kits.","benefits":null,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ This project currently reports no monetised benefits. The project's benefits focus on the successful onward operation of the Drug Testing Service.","themes":["Cost & funding","Delivery & schedule","Technical & integration"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Ongoing implementation risks. Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 08/10/2025. This is primarily due to the following…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","outcomeStatus":"Outcome not established in annual CSV","outcomeEvidence":"The project has no record in the 2025-26 release. The annual CSV does not identify whether it delivered, closed early, was replaced or ceased to meet the portfolio criteria."},{"id":"ONS_0003_2021-Q4","year":2025,"name":"Integrated Data Programme (IDP)","department":"ONS","category":"Government Transformation and Service Delivery","description":"The Integrated Data Service Programme (IDSP) supports UKSA’s ongoing contribution to the Government’s National Data Strategy to unlock the power of data across government and the wider economy. The Integrated Data Service is a trusted research environment (TRE) with a comprehensive service wrapper that addresses longstanding cultural, technical, and legal challenges to the use of government data for the public good. The IDS identifies and addresses these key challenges, delivering innovative solutions that drive progress. It establishes a responsive, end-to-end, modern, and scalable analytical environment, which significantly enhances policy formation, evaluation, and response. As such, the IDS acts as a secure and sustainable solution for government to obtain valuable insights from its data, with analysis of this valuable, systematically linked data already supporting a host of innovative analytic projects that feed into the Government’s key missions.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at RED. This is primarily due to the following factors‚ NISTA conducted a Gateway 0 Review of the programme in March 2025. The programme was given a RED DCA due to being unable to demonstrate sufficient progress in unlocking cross-government data sharing; limited case studies of analysis undertaken on IDS; ongoing uncertainty in the relationship with NDL and the future of linked data; lack of a replacement Programme Director.","startDate":"2020-01-01","endDate":"2026-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2025 to 31/03/2026. This is primarily due to the following factors‚ The first phase of the programme up to 24/25-Q4 did not deliver the planned capability as rapidly as originally expected, with challenges including the implementation of data infrastructure that provided appropriate security combined with the flexibility to link complex datasets of variable and often insufficient quality, and with accessing and securing agreement to share data from and with other government departments. Funding into 2025/26 enabled the programme to deliver the service, which is now up and running, with an unprecedented, critical mass of high value indexed data enabling mission-aligned analysis. In FY25/26 the programme will focus on four transformation stages to further enhance and scale the service: data sharing permissions, indexing and linking data, finding and accessing linked data and utilising data within policy processes.","fyBaseline":55.3,"fyForecast":54.7,"fyVariance":1.08,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":284.6,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 525 to 284.6. This is primarily due to the following factors‚ This is primarily due to the recognition that some of the previously ring-fenced programme funding was supporting core ONS infrastructure required for the Integrated Data Service but equally for the everyday delivery of core statistics. The ring-fenced programme funding was therefore revised down from 2025/26 onwards as per the outcome of the 2025 Spending Review Phase 1. Previously £53m per annum had been included from 2025/26 through to 2029/30. This has been reduced to £24.6m in 2025/26 and £0m ongoing. Post 2025/26 budgets are dependent on the Business case decision and the outcome from the Spending Review Phase 2.","benefits":1374.37,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 1348 to 1374. This is primarily due to the following factors‚ Government Cash releasing benefit saw a slight increase of £20k due to recalculation of the benefit value associated with closure of the SRS which was included at that time. Government non-cash releasing benefit saw a marginal decrease in value by £3k due to a revision to forecast user growth on the IDS based on SRS trends. Wider UK Public Economic benefit saw the largest change with an increase of £26.280m due to an increase in forecast project growth on the IDS in future years based on SRS trends.","themes":["Technical & integration","Cost & funding","Approvals & decisions","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at RED. This is primarily due to the following factors‚ NISTA conducted a Gateway 0 Review of the programme in March 2025. The programme was given a RED DCA due to being unable to demonstrate sufficient progress in unlocking…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","outcomeStatus":"Outcome not established in annual CSV","outcomeEvidence":"The project has no record in the 2025-26 release. The annual CSV does not identify whether it delivered, closed early, was replaced or ceased to meet the portfolio criteria."},{"id":"ONS_0261_2324-Q1","year":2025,"name":"Future Population and Migration Statistics (FPMS) Programme","department":"ONS","category":"Government Transformation and Service Delivery","description":"The Future Population and Migration Statistics (FPMS) Programme provides the Office for National Statistics (ONS) the opportunity to continue to transform the way in which it produces statistics on the population and society. It builds on the successful transformation of the Census and Data Collection Transformation Programme (CDCTP). A focus of the programme is maximising administrative data to support the ongoing production of population and migration statistics responding to user needs and agnostic of data collection methods.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 decreased from RED to AMBER. This is primarily due to the following factors‚ Certainty around the programmes funding and direction following approval of the Outline Business Case (OBC) Refresh and successful delivery of core objectives over its initial period of design and build. Most notable have been key successes in the admin data research and delivery. With key publications released to help support and progress this work forward. The programme continues to engage with users to ensure appropriate statistical design, assure statistical methods and to convey admin data quality. The agreement by the UK Statistics Authority board on the recommendation resulting in a refreshing of the business case during 2025-26.","startDate":"2023-04-28","endDate":"2025-06-30","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/10/2024 to 30/06/2025. This is primarily due to the following factors‚ The project submitted an Outline Business Case (OBC) Refresh to HM Treasury in October 2023, this provided the programme’s first three years (up to 31 March 2026) funding. Additional funding will be sought via a Full Business Case (FBC) which will aim to deliver the objectives of the programme further as the programme continues to iterate.","fyBaseline":54.12,"fyForecast":54.12,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%. Not applicable as per guidance","wholeLifeCost":82.61,"costNarrative":"Compared to financial year 23/24-Q4, the project’s departmentally agreed Whole Life Cost at 24-25-Q4 (measured in £m) increased from 27 to 83. This is primarily due to the following factors: The Whole Life Costs for the 2023 / 2024 Financial Year were revised in 24-25-Q1 to £28.491m, following an allowed £2m switch in budget from IDP to FPMS. The Whole Life Costs are showing as £82.611m as per our period 11 reporting for the 2024 / 2025 Financial Year, a year on year increase of £54m. These costs are in relation to the approval of the Outline Business Case (OBC) refresh that was submitted in October 2023 and approval of the Spending Review. Further forecasts will be added to the above figure in the next return as the programme continues to progress towards its next Business Case.","benefits":null,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ The programme is currently in a research and development phase. As part of this, financial benefits are being calculated through external Value for Money and Return on Investment appraisals. To reflect this, only qualitative benefits are currently being tracked. Once a full business case has been submitted, a fuller picture will emerge of potential financial benefits from the programme.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 decreased from RED to AMBER. This is primarily due to the following factors‚ Certainty around the programmes funding and direction following approval of the Outline Business Case (OBC) Refresh and successful delivery of core…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","outcomeStatus":"Outcome not established in annual CSV","outcomeEvidence":"The project has no record in the 2025-26 release. The annual CSV does not identify whether it delivered, closed early, was replaced or ceased to meet the portfolio criteria."}]} \ No newline at end of file +{"meta":{"generated":"2026-10-29T18:51:17+00:00","latestSnapshot":"2026-03-31","method":"Deterministic year-on-year comparison with transparent keyword theme signals","limitations":["Delivery Confidence Assessments are point-in-time judgements, not final outcomes.","Narrative themes are keyword signals and do not establish causation.","Whole-life cost values are not compared across years because reporting price bases can differ.","Missing and exempt values are excluded from like-for-like transitions.","Absence from the latest release does not establish delivery success or failure."]},"summary":{"latestProjects":189,"historyRecords":1417,"matchedLatest":170,"allFourYears":129,"allReleaseYears":35,"transitions":{"Unchanged":103,"Improved":30,"Worsened":18,"Not comparable":38},"ratingCounts":{"Red":34,"Amber":109,"Green":29,"Not published":17},"ratingSourceCounts":{"Independent assurance":81,"SRO Q4 assessment":91,"Not published":17},"topThemes":[{"theme":"Cost & funding","count":164},{"theme":"Delivery & schedule","count":164},{"theme":"Governance & assurance","count":90},{"theme":"Commercial & supply chain","count":87},{"theme":"Approvals & decisions","count":67},{"theme":"Scope & requirements","count":40},{"theme":"Workforce & capability","count":29},{"theme":"Technical & integration","count":24}],"comparability":{"2020-2021":85,"2021-2022":159,"2022-2023":206,"2023-2024":191,"2024-2025":198,"2025-2026":170},"latestLeavers":43,"reportedLatestLeavers":42,"leaverCountDifference":1},"taxonomy":{"Approvals & decisions":["approval","business case","planning decision","consent","decision","review note","spending review","authorisation","authorization"],"Workforce & capability":["workforce","resource","resourcing","capacity","skills","recruit","crew","staff","capability","training"],"Commercial & supply chain":["supplier","supply chain","commercial","contract","procurement","tender","market","inflation","affordability"],"Scope & requirements":["scope","requirement","design","specification","strategic direction","change control","rebaseline","re-baseline","reset"],"Governance & assurance":["governance","assurance","accountability","oversight","review","sro","programme board"],"Technical & integration":["technical","technology","integration","engineering","testing","digital","data","migration","interoperability"],"Delivery & schedule":["schedule","delay","milestone","delivery","timetable","completion","progress","pace","critical path","slippage"],"Cost & funding":["cost","budget","funding","finance","financial","whole life","spend","expenditure"]},"sources":[{"year":2020,"file":"gmpp_2019_20.csv","label":"IPA Annual Report 2019-20","url":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2020"},{"year":2021,"file":"gmpp_2020_21.csv","label":"IPA Annual Report 2020-21","url":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021"},{"year":2022,"file":"gmpp_2021_22.csv","label":"IPA Annual Report 2021-22","url":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022"},{"year":2023,"file":"gmpp_2022_23.csv","label":"IPA Annual Report 2022-23","url":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23"},{"year":2024,"file":"gmpp_2023_24.csv","label":"IPA Annual Report 2023-24","url":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24"},{"year":2025,"file":"gmpp_2024_25.csv","label":"NISTA Annual Report 2024-25","url":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025"},{"year":2026,"file":"gmpp_2025_26.csv","label":"NISTA Major Projects Annual Report 2025-26","url":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26"}],"externalSources":[{"label":"Major projects data archive","type":"Historic disclosure","url":"https://www.gov.uk/government/collections/major-projects-data","use":"Earlier annual and departmental releases back to 2013"},{"label":"UK Infrastructure Pipeline","type":"Forward look","url":"https://www.gov.uk/government/publications/uk-infrastructure-pipeline","use":"Status, expected completion and anticipated investment"},{"label":"NAO major-project value review","type":"Independent scrutiny","url":"https://www.nao.org.uk/insights/delivering-value-from-government-investment-in-major-projects/","use":"Benefits, outcomes and recurring delivery lessons"},{"label":"Public Accounts Committee value inquiry","type":"Parliamentary scrutiny","url":"https://publications.parliament.uk/pa/cm5804/cmselect/cmpubacc/456/report.html","use":"Evidence on whether outputs translated into public value"},{"label":"Contracts Finder","type":"Commercial evidence","url":"https://www.contractsfinder.service.gov.uk/Search","use":"Procurement notices, awards and supplier opportunities"},{"label":"Evaluation Registry","type":"Outcome evidence","url":"https://evaluation-registry.cabinetoffice.gov.uk/","use":"Registered government evaluations and published findings"}],"projects":[{"id":"MOD_0104_1617-Q1","year":2026,"name":"ARMOUR MBT 2025","department":"MOD","category":"Military Capability","description":"The Armour Main Battle Tank (MBT) Programme will deliver the Challenger 3 capability. Challenger 3 will be Defence’s only guaranteed, 24 hr, all weather, mobile anti-tank capability. This programme will modernise and improve the British Army’s MBTs to the standard needed on today’s battlefield. Key elements include enhanced survivability, greater lethality, improved surveillance and target acquisition as well as removing obsolescence. The currently forecasted out of service date is 2040 but this is likely to be extended beyond this date to ensure value for money.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 decreased to Red. This is primarily due to the following factors. 1. Forecast delays and risk to Initial Operating Capability and Full Operating capability in delivery from the Prime Contractor. 2. Demonstration phase trials are still progressing to prove the performance of the tank but the time taken to do this is likely to impact on training and familiarisation","startDate":"2014-12-04","endDate":"2032-10-11","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 22/05/2031. This is primarily due to the following factors. 1. This forecast date remains subject to confirmation and could be subject to change if anticipated delays in equipment deliveries are encountered.","fyBaseline":204.59,"fyForecast":136.48,"fyVariance":33.29,"varianceNarrative":"The in-year variance exceeds 5%. This is primarily due to the following factors. 1. Reprofiling into future years, underlying cost movements, and, Foreign Exchange rate changes. 2. The key decreases relate to the anticipated delays in deliveries from the Prime Contractor. 3. Costings for 25/26 reflect the latest forecast and not the revised delivery schedule. These adjustments will be presented for approval in due course.","wholeLifeCost":1979.22,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) increased from £1916.53M to £1944.09M. This is primarily due to the following factors. 1. Adjustments to reflect the anticipated delays in deliveries from the Prime Contractor. A revised costing profile is expected in Q1 26/27.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. The project's departmentally agreed Benefits WLT is unchanged.","themes":["Cost & funding","Delivery & schedule","Workforce & capability","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 decreased to Red. This is primarily due to the following factors. 1. Forecast delays and risk to Initial Operating Capability and Full Operating capability in delivery from the Prime Contractor. 2. Demonstration phase trials are still progressing to…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":true,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 22/05/2031. This is primarily due to the following factors. 1. This forecast date remains subject to confirmation and could be subject to change if anticipated delays in equipment deliveries are encountered.","narrativeClaimKind":"date-mismatch","history":[{"id":"MOD_0104_1617-Q1","year":2020,"name":"Armour MBT 2025","department":"MOD","category":"Military Capability","description":"An extension of the Army's MBT capability as part of a balanced force, credible and employable against current and emerging threats, across the mosaic of conflict, and the identification of future capability options beyond 2035.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber, which has not changed since last year�s Q2 1819 Amber, due primarily to the following factors; - During this period the Armour MBT 2025 programme concluded its competitive, obsolescence only, assessment phase prior to entering an Investment Approvals Committee (IAC) / HM Treasury (HMT) approved expanded assessment phase to assess enhancements to lethality and survivability. At this early stage in the project lifecycle whilst the scope, risks and opportunities are being assessed and evaluated, the maintenance of an amber grade remains appropriate. - In the obsolescence only assessment phase Rheinmetall Landsysteme (RLS) conducted significant technical risk reduction work; this has improved confidence in platform delivery. The programme however is complex, with a number of ley dependencies; as such it is more than simply the delivery of the tank. Given programme complexity an amber grade remains appropriate. Since the Q2 1920 (30th September 2019) Amber IPA DCA, the following non-project operating environment activities have impacted the original Q2 IPA DCA; - COVID 19 is having an impact. Working from home and COVID 19 control measures could reduce and delay the provision of evidence for the full business case submission. Since the Q2 1920 (30th September 2019) Amber IPA DCA, the following primary project actions have impacted the original Q2 IPA DCA; - The programme is currently clarifying and negotiating the Rheinmetall BAE Systems Land (RBSL) tender return. The outcome of which will either have a positive or negative impact on performance, cost and time. It is too early to draw a conclusion. - Rheinmetall BAE Systems Land (RBSL) delivered both their report at the end of the second assessment phase and their tender return on time. This has therefore had a neutral impact on the DCA. - A number of the risks have been mitigated since the last IPA DCA. Although this is positive, risks remain and work continues to either resolve or mitigate them.","startDate":"2014-12-04","endDate":"2028-07-31","scheduleNarrative":"The scheduled baseline project end date at Q2 1920 (30th September 2019) is 31/07/28, has lengthened by 791 days since last year's Q2 1819 date of 01/06/26, due primarily to the following factors; - In this period the programme's scope was expanded from obsolescence only to include enhancements to its lethality and survivability. The expanded scope has also lengthened the time to complete the work and increased cost over the assessment, demonstration and manufacture phases. These dates are currently subject to negotiation and will be confirmed when the full business case has been approved. Since the Q2 1920 (30th September 2019) baseline project end date of 31/07/28, the following non-project operating environment activities have impacted the original Q2 baseline project end date; - Currently the impact of COVID 19 on the programme end date is unknown. Other non-project activities have not had an impact. Since the Q2 1920 (30th September 2019) baseline project end date of 31/07/28, the following primary project actions have impacted the original Q2 baseline project end date; - The change in dates are purely as a result of the expanded scope, as explained above.","fyBaseline":12.46,"fyForecast":11.95,"fyVariance":-4.0,"varianceNarrative":"Budget variance less than 5%","wholeLifeCost":1304.19,"costNarrative":"The baseline Whole Life Cost at Q2 1920 (30th September 2019) is �1,304.19 m, due primarily to the following factors; - This reflects the financial position following the capability uplift endorsed by HMT. This sees a capability uplift and extension to the Main Battle Tank out to 2035.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Scope & requirements","Approvals & decisions"],"evidenceExcerpt":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber, which has not changed since last year�s Q2 1819 Amber, due primarily to the following factors; - During this period the Armour MBT 2025 programme concluded its competitive, obsolescence only, assessment phase prior to entering an Investment Approvals Committee…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2020","sourceLabel":"IPA Annual Report 2019-20","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The scheduled baseline project end date at Q2 1920 (30th September 2019) is 31/07/28, has lengthened by 791 days since last year's Q2 1819 date of 01/06/26, due primarily to the following factors; - In this period the programme's scope was expanded from obsolescence only to include enhancements to its lethality and survivability. The expanded scope has also lengthened the time to complete the work and increased cost over the assessment, demonstration and manufacture phases. These dates are currently subject to negotiation and will be confirmed when the full business case has been approved. Since the Q2 1920 (30th September 2019) baseline project end date of 31/07/28, the following non-project operating environment activities have impacted the original Q2 baseline project end date; - Currently the impact of COVID 19 on the programme end date is unknown. Other non-project activities have not had an impact. Since the Q2 1920 (30th September 2019) baseline project end date of 31/07/28, the following primary project actions have impacted the original Q2 baseline project end date; - The change in dates are purely as a result of the expanded scope, as explained above.","narrativeClaimKind":null},{"id":"MOD_0104_1617-Q1","year":2021,"name":"Armour Main Battle Tank","department":"MOD","category":"Military Capability","description":"The Armour Main Battle Tank Programme is the extension of the Army's Main Battle Tank capability as part of a balanced force, credible and employable against current and emerging threats until an extended out of service date out to at least 2040. This will be achieved through a series of projects to extend the life of the current platform to deliver Challenger 3. These projects will fall under the governance of the overall Armour Main Battle Tank Programme. They include addressing obsolescence, lethality and survivability. Mobility is being addressed through a separate pan-platform project.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber. This is primarily due to the following factors: With the recent progress in approval of the Full Business Case and subsequent contract awarded to Rheinmetall and BAES Land, I remain confident that this Programme can deliver to cost, time and performance. However, the Infrastructure and Projects Authority will have the opportunity to review the delivery confidence on during their next review in late 2021. In parallel options are being investigated to accelerate the schedule.","startDate":"2017-12-18","endDate":"2026-06-01","scheduleNarrative":"Compared to financial year 19/20-Q2, the project's end-date remained scheduled to finish on 01 June 2026 . This is primarily due to the following factors: Schedule dates have been revised during contract negotiation contract signature in March 21. Key milestones (50% confidence) are: - Initial Operating Capability (1 squadron of 18 tanks with crews trained at appropriate collective training standard) - November 27. - Full Operating Capability (148 tanks delivered): November 30. These dates are later than envisaged at Initial Gate. This slip has arisen during contractual negotiations due to the perception in Industry of delivery and cost risk around the Design and Manufacture phases, reflecting that which has been witnessed from other projects.","fyBaseline":9.4,"fyForecast":9.1,"fyVariance":-3.0,"varianceNarrative":"The budget variance is less than or equal to 5%. The Financial Year 20/21 forecast to budget variance of �7.968m (536%) reflects the authorised bring forward of costs from April 21 into March 21 due to an earlier than planned contract award.","wholeLifeCost":1399.17,"costNarrative":"Compared to financial year 19/20-Q2, the projects Baseline Whole Life Cost increased from �1304.19m to �1399.17m. This is primarily due to the following factors: This is due to the provision for the purchase of war stock ammunition under the Full Business Case approval. This budget was not previously included in previous estimates.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber. This is primarily due to the following factors: With the recent progress in approval of the Full Business Case and subsequent contract awarded to Rheinmetall and BAES Land, I remain confident that this Programme can deliver to…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21","narrativeSaysUnchangedButMoved":true,"narrativeExcerpt":"Compared to financial year 19/20-Q2, the project's end-date remained scheduled to finish on 01 June 2026 . This is primarily due to the following factors: Schedule dates have been revised during contract negotiation contract signature in March 21. Key milestones (50% confidence) are: - Initial Operating Capability (1 squadron of 18 tanks with crews trained at appropriate collective training standard) - November 27. - Full Operating Capability (148 tanks delivered): November 30. These dates are later than envisaged at Initial Gate. This slip has arisen during contractual negotiations due to the perception in Industry of delivery and cost risk around the Design and Manufacture phases, reflecting that which has been witnessed from other projects.","narrativeClaimKind":"says-unchanged"},{"id":"MOD_0104_1617-Q1","year":2022,"name":"Armour MBT 2025","department":"MOD","category":"Military Capability","description":"The Armour Main Battle Tank Programme is the extension of the Army's Main Battle Tank capability as part of a balanced force, credible and employable against current and emerging threats until an extended out of service date out to at least 2040. This will be achieved through a series of projects to extend the life of the current platform to deliver Challenger 3. These projects will fall under the governance of the overall Armour Main Battle Tank Programme. They include addressing obsolescence, lethality and survivability. Mobility is being addressed through a separate pan-platform project.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber. This is primarily due to the following factors: The Defence in a Competitive Age Command Paper (CP411) published in March 2021 confirmed that the Army will invest around £1.3bn in our armoured capability by upgrading 148 of our main battle tanks to ensure the Challenger III will become one of the most protected and most lethal in Europe. The remaining fleet will be retired. Planning to realise this and explore opportunity for acceleration continues.","startDate":"2014-12-04","endDate":"2026-06-01","scheduleNarrative":"Compared to 2021-Q4, the project end-date remained scheduled to finish on 01 June 2026.","fyBaseline":65.55,"fyForecast":76.2,"fyVariance":16.0,"varianceNarrative":"The budget variance exceeds 5%. The Financial Year 21/22 forecast was £65.6M with the actual spend being £76.3M, giving a variance of £10.7M (a 16% positive variance to the original forecast of £65.6M). Most of the variance is due to a reprofile of the payment milestone associated with the Interim Design Review 2 being brought forward from Financial Year 22/23 to 21/22.","wholeLifeCost":1372.0,"costNarrative":"Compared to 2021-Q4, the projects Baseline Whole Life Cost decreased from 1407.14 (£m) to 1371.97 (£m). This is primarily due to the following factors: The financial position has changed since FY20/21 and was confirmed in the Full Business Case approved in Mar 21 as £1.422Bn. The new Approved Budgetary Limit now includes an additional £43M in the equipment programme (accounting for an increase in the demonstration and integration costs of a new ammunition nature) and a reduction in the support costs of £24M, that currently sits outside of the reported programme baseline whole-life cost of £1,371.966M.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber. This is primarily due to the following factors: The Defence in a Competitive Age Command Paper (CP411) published in March 2021 confirmed that the Army will invest around £1.3bn in our armoured capability by upgrading 148 of…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to 2021-Q4, the project end-date remained scheduled to finish on 01 June 2026.","narrativeClaimKind":null},{"id":"MOD_0104_1617-Q1","year":2023,"name":"Armour MBT 2025","department":"MOD","category":"Military Capability","description":"The Armour Main Battle Tank Programme will deliver the Challenger 3 capability. Challenger 3 will be Defence's only guaranteed, 24 hr, all weather, mobile anti-tank capability. This programme will modernise and improve the British Army's Main Battle Tanks to the standard needed on today's battlefield. Upgrades include enhanced survivability; greater lethality, improved surveillance and target acquisition as well as removing obsolescence.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber (SRO rating). This is primarily due to the following factors. Global supply chain risks and key supplier issues that could impact delivery, and resource shortfalls and challenges to recruit the required skill and experience levels.","startDate":"2014-12-04","endDate":"2031-05-22","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 increased from 2026-06-01 to 2031-05-22. This is primarily due to the following factors. The end-date of June 2026 reflected the obsolesce scope of the original Challenger 2 Life Extension Project when it was established in 2015. This should have been adjusted in 2019 when the scope of the programme was increased to deliver a genuine capability uplift to Challenger 2. This effectively reset the Performance, Cost and Time envelope of the programme, and was further refined through the revised assessment phase and Full Business Case submission in November 2020. The end-date of May 2031 reflects Full Operating Capability being delivered by November 2030 at P50 confidence.","fyBaseline":107.86,"fyForecast":87.87,"fyVariance":-19.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors: Delays to Epsom Armour have impacted trials, ammunition integration work and along with supply chain issues, it has been necessary to defer payments until milestones are satisfied now expected in the Financial Year 23/24","wholeLifeCost":1435.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 increased from 1372m. to 1435m. This is primarily due to the following factors. Reprofiling into future years, also the recent initial pre-negotiated Epsom proposal being higher than originallyestimated","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This programme does not report cashable benefits. Its aim is to provision the armed forces with the equipment and / or infrastructure required.","themes":["Cost & funding","Workforce & capability","Commercial & supply chain","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber (SRO rating). This is primarily due to the following factors. Global supply chain risks and key supplier issues that could impact delivery, and resource shortfalls and challenges to recruit the required skill and experience levels. Compared to…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 increased from 2026-06-01 to 2031-05-22. This is primarily due to the following factors. The end-date of June 2026 reflected the obsolesce scope of the original Challenger 2 Life Extension Project when it was established in 2015. This should have been adjusted in 2019 when the scope of the programme was increased to deliver a genuine capability uplift to Challenger 2. This effectively reset the Performance, Cost and Time envelope of the programme, and was further refined through the revised assessment phase and Full Business Case submission in November 2020. The end-date of May 2031 reflects Full Operating Capability being delivered by November 2030 at P50 confidence.","narrativeClaimKind":null},{"id":"MOD_0104_1617-Q1","year":2024,"name":"Armour MBT","department":"MOD","category":"Military Capability","description":"The Armour Main Battle Tank (MBT) Programme will deliver the Challenger 3 (CR3) capability. Challenger 3 will be Defence’s only guaranteed, 24 hr, all weather, mobile anti-tank capability. This programme will modernise and improve the British Army’s MBTs to the standard needed on today’s battlefield. Key elements include enhanced survivability, greater lethality, improved surveillance and target acquisition as well as removing obsolescence. The currently forecasted out of service date is 2040.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure and Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. 1. Global supply chain risks and key supplier issues that could impact delivery. 2. Resource shortfalls and challenges to recruit the required skill and experience levels in the Army Programme Management Office; DE and S and key suppliers. 3. Delivery of broader capabilities required to transition the Challenger 3 (CR3) platform into service; these currently have unresourced gaps which could impact delivery within the required timeline. 4. Ability to obtain approvals and contract at pace to deliver the remaining scope of the programme in an acceptable timeframe. This mainly pertains to the Active Protection System.","startDate":"2014-12-04","endDate":"2030-06-30","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained scheduled to finish on 2030-06-30. This is primarily due to the following factors. The programme remains on track to achieve its key milestones. These are. Initial Operating Capability (1 Squadron of tanks with crews trained to the appropriate standard and held at readiness) – November 2027. Full Operating Capability (148 tanks delivered and all Key User Requirements met subject to subsequent approvals). November 2030. The platform Critical Design Review was achieved in January 2023 providing confidence in the design and readiness for the next phases of delivery.","fyBaseline":217.46,"fyForecast":106.86,"fyVariance":-50.86,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The main causes of the underspend are: The alignment of the Rheinmetall BAE Land Systems (RBSL) contract to the latest pre-series vehicle delivery dates, placement of the EPSOM Design and Manufacture (D&M) contract, confirmation of Government Furnished Equipment (GFE), alignment to the German Government plans for the Enhanced Kinetic Solution, the Active Protection System (APS) de-risking activity being removed, and FOREX volatility.","wholeLifeCost":1986.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 increased from 1435m to 1987m. This is primarily due to the following factors. At Q4 22/23 the Baseline Whole Life cost was 1435m. Following completion of EPSOM (New Armour System) negotiations this decreased by 13m to 1422m. As at March 2024 the new WLC of 1985m includes the costings for the full EPSOM 148 Inert sets and Active Protection System D&M. The review note agreeing this uplift is still subject to approval by the Treasury.","benefits":0.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 0m.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure and Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. 1. Global supply chain risks and key supplier issues that could impact delivery. 2. Resource shortfalls and challenges to recruit the required skill and…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":true,"narrativeExcerpt":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained scheduled to finish on 2030-06-30. This is primarily due to the following factors. The programme remains on track to achieve its key milestones. These are. Initial Operating Capability (1 Squadron of tanks with crews trained to the appropriate standard and held at readiness) – November 2027. Full Operating Capability (148 tanks delivered and all Key User Requirements met subject to subsequent approvals). November 2030. The platform Critical Design Review was achieved in January 2023 providing confidence in the design and readiness for the next phases of delivery.","narrativeClaimKind":"says-unchanged"},{"id":"MOD_0104_1617-Q1","year":2025,"name":"ARMOUR MBT 2025","department":"MoD","category":"Military Capability","description":"The Armour Main Battle Tank (MBT) Programme will deliver the Challenger 3 (CR3) capability. Challenger 3 will be Defence’s only guaranteed, 24 hour, all weather, mobile anti-tank capability. This programme will modernise and improve the British Army’s MBTs to the standard needed on today’s battlefield. Key elements include enhanced survivability, greater lethality, improved surveillance and target acquisition as well as removing obsolescence.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Project's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER, compared with the Infrastructure and Projects Authority's assessment last year of AMBER. This is due to the following factors. 1. Key supplier issues that could impact delivery. 2. The Delivery of the broader capabilities required to transition the CR3 platform into service currently has encountered funding gaps which could impact delivery within the required timeline. 3. Resource shortfalls and challenges to recruit the required skills and experience levels in the Army Programme Management Office, Delivery Equipment and Support teams (DE and S) and key suppliers presents another key challenge.","startDate":"2014-12-04","endDate":"2031-05-22","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 30/06/2030 to 22/05/2031. This is primarily due to the following factors: This a correction from the previously released information. The Investment Approval Committee agreed forecast end date remains unchanged as 22/05/2031.","fyBaseline":165.95,"fyForecast":178.13,"fyVariance":7.34,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. Reprofiling from future years; underlying cost movements; and, Foreign Exchange rate changes. The key increases relate to placement of contracts for EPSOM armour and the Active Protection System following approval of those elements in June 2024.","wholeLifeCost":1916.53,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 1986 to 1916. This is primarily due to the following factors. Necessary adjustments to reflect the timing and level of approved costs related to the procurement of Active Protection System and additional EPSOM armour.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits","themes":["Cost & funding","Delivery & schedule","Workforce & capability","Approvals & decisions"],"evidenceExcerpt":"The Project's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER, compared with the Infrastructure and Projects Authority's assessment last year of AMBER. This is due to the following factors. 1. Key supplier issues that could impact delivery. 2. The Delivery of the broader capabilities required to transition the CR3 platform into service currently…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 30/06/2030 to 22/05/2031. This is primarily due to the following factors: This a correction from the previously released information. The Investment Approval Committee agreed forecast end date remains unchanged as 22/05/2031.","narrativeClaimKind":null},{"id":"MOD_0104_1617-Q1","year":2026,"name":"ARMOUR MBT 2025","department":"MOD","category":"Military Capability","description":"The Armour Main Battle Tank (MBT) Programme will deliver the Challenger 3 capability. Challenger 3 will be Defence’s only guaranteed, 24 hr, all weather, mobile anti-tank capability. This programme will modernise and improve the British Army’s MBTs to the standard needed on today’s battlefield. Key elements include enhanced survivability, greater lethality, improved surveillance and target acquisition as well as removing obsolescence. The currently forecasted out of service date is 2040 but this is likely to be extended beyond this date to ensure value for money.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 decreased to Red. This is primarily due to the following factors. 1. Forecast delays and risk to Initial Operating Capability and Full Operating capability in delivery from the Prime Contractor. 2. Demonstration phase trials are still progressing to prove the performance of the tank but the time taken to do this is likely to impact on training and familiarisation","startDate":"2014-12-04","endDate":"2032-10-11","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 22/05/2031. This is primarily due to the following factors. 1. This forecast date remains subject to confirmation and could be subject to change if anticipated delays in equipment deliveries are encountered.","fyBaseline":204.59,"fyForecast":136.48,"fyVariance":33.29,"varianceNarrative":"The in-year variance exceeds 5%. This is primarily due to the following factors. 1. Reprofiling into future years, underlying cost movements, and, Foreign Exchange rate changes. 2. The key decreases relate to the anticipated delays in deliveries from the Prime Contractor. 3. Costings for 25/26 reflect the latest forecast and not the revised delivery schedule. These adjustments will be presented for approval in due course.","wholeLifeCost":1979.22,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) increased from £1916.53M to £1944.09M. This is primarily due to the following factors. 1. Adjustments to reflect the anticipated delays in deliveries from the Prime Contractor. A revised costing profile is expected in Q1 26/27.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. The project's departmentally agreed Benefits WLT is unchanged.","themes":["Cost & funding","Delivery & schedule","Workforce & capability","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 decreased to Red. This is primarily due to the following factors. 1. Forecast delays and risk to Initial Operating Capability and Full Operating capability in delivery from the Prime Contractor. 2. Demonstration phase trials are still progressing to…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":true,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 22/05/2031. This is primarily due to the following factors. 1. This forecast date remains subject to confirmation and could be subject to change if anticipated delays in equipment deliveries are encountered.","narrativeClaimKind":"date-mismatch"}],"previous":{"id":"MOD_0104_1617-Q1","year":2025,"name":"ARMOUR MBT 2025","department":"MoD","category":"Military Capability","description":"The Armour Main Battle Tank (MBT) Programme will deliver the Challenger 3 (CR3) capability. Challenger 3 will be Defence’s only guaranteed, 24 hour, all weather, mobile anti-tank capability. This programme will modernise and improve the British Army’s MBTs to the standard needed on today’s battlefield. Key elements include enhanced survivability, greater lethality, improved surveillance and target acquisition as well as removing obsolescence.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Project's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER, compared with the Infrastructure and Projects Authority's assessment last year of AMBER. This is due to the following factors. 1. Key supplier issues that could impact delivery. 2. The Delivery of the broader capabilities required to transition the CR3 platform into service currently has encountered funding gaps which could impact delivery within the required timeline. 3. Resource shortfalls and challenges to recruit the required skills and experience levels in the Army Programme Management Office, Delivery Equipment and Support teams (DE and S) and key suppliers presents another key challenge.","startDate":"2014-12-04","endDate":"2031-05-22","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 30/06/2030 to 22/05/2031. This is primarily due to the following factors: This a correction from the previously released information. The Investment Approval Committee agreed forecast end date remains unchanged as 22/05/2031.","fyBaseline":165.95,"fyForecast":178.13,"fyVariance":7.34,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. Reprofiling from future years; underlying cost movements; and, Foreign Exchange rate changes. The key increases relate to placement of contracts for EPSOM armour and the Active Protection System following approval of those elements in June 2024.","wholeLifeCost":1916.53,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 1986 to 1916. This is primarily due to the following factors. Necessary adjustments to reflect the timing and level of approved costs related to the procurement of Active Protection System and additional EPSOM armour.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits","themes":["Cost & funding","Delivery & schedule","Workforce & capability","Approvals & decisions"],"evidenceExcerpt":"The Project's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER, compared with the Infrastructure and Projects Authority's assessment last year of AMBER. This is due to the following factors. 1. Key supplier issues that could impact delivery. 2. The Delivery of the broader capabilities required to transition the CR3 platform into service currently…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 30/06/2030 to 22/05/2031. This is primarily due to the following factors: This a correction from the previously released information. The Investment Approval Committee agreed forecast end date remains unchanged as 22/05/2031.","narrativeClaimKind":null},"ratingDelta":1,"transition":"Worsened","endDateDeltaDays":508,"attentionScore":100,"attentionReasons":["Published commentary says the end date is unchanged while the published date moved","Current published delivery confidence is Red","Published rating worsened from Amber to Red","Published end date moved 508 days later"]},{"id":"HO_0286_2324-Q2","year":2026,"name":"Asylum Support Accommodation Programme","department":"HO","category":"Government Transformation and Service Delivery","description":"The Asylum Support Accommodation Programme (ASAP) is focused on establishing new delivery and commercial arrangements for asylum accommodation and support services, with the aim of creating a more sustainable, scalable and effective system. The programme will deliver a suite of new and transformed contracts as part of a wider operating model, supported by enhanced management capability to improve oversight and system performance. ASAP will also replace a number of existing contracts, including the Asylum Accommodation and Support Contracts (AASC), Advice, Issue Reporting and Eligibility (AIRE), and Asylum Support Payments (ASP). This transition reflects the need to address affordability pressures, strengthen contract management, and reduce risks associated with the current delivery model.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) at 2025/26 Q4 increased to Red. This reflects the findings of a recent Programme Assurance Review (PAR), which highlighted significant delivery complexity and sustained pressure across key enabling functions. A revised Business Transformation Delivery Model has been endorsed, representing a change in project definition and requiring a period of re‑planning and re‑baselining across the programme. The programme continues to work towards submission of the OBC1 (FACT) which the PAR team will return to assess, and subject to a successful review, the programme will return to an Amber status for the OBC to be reviewed at InvestCo. In January 26, the Bridging Accommodation & Services Project (BASP) was closed as its original aims were no longer achievable. Activity is underway to establish the Collective Accommodation Management Service (CAMS) project within the scope of ASAP.","startDate":null,"endDate":"2029-12-21","scheduleNarrative":"The programme end date remains 14 June 2030 and is unchanged, reflecting current delivery and transition assumptions. Project closure is scheduled for 21 December 2029, following delivery of the Hybrid – Cluster 4 milestone and the ASAP – Hybrid Mobilisation milestone. This is followed by an estimated transition period of approximately 5.5 months to business‑as‑usual operations, resulting in a programme closure date of June 2030. The ASAP Programme Plan has been approved and baselined, with further work undertaken to strengthen planning quality across all levels of the programme. Detailed resource requirements are being developed to provide a comprehensive view of demand across the programme. Change control processes have been refined and aligned with established governance arrangements under the Senior Responsible Owner, ensuring that the impacts of any changes to the delivery model are fully understood and managed. Work is also ongoing to ensure that the programme plan reflects the integration of key enabling functions required to support effective management control, underpinned by a comprehensive reporting framework.","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"The projects departmentally agreed Benefits at 25/26 Q4 (measured in £m) is 0. The programme has not yet agreed benefits profiles, these are still being developed and will be agreed at Outline Business Case stage.","themes":["Delivery & schedule","Governance & assurance","Commercial & supply chain","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) at 2025/26 Q4 increased to Red. This reflects the findings of a recent Programme Assurance Review (PAR), which highlighted significant delivery complexity and sustained pressure across key enabling functions. A revised Business Transformation Delivery Model has been…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":true,"narrativeExcerpt":"The programme end date remains 14 June 2030 and is unchanged, reflecting current delivery and transition assumptions. Project closure is scheduled for 21 December 2029, following delivery of the Hybrid – Cluster 4 milestone and the ASAP – Hybrid Mobilisation milestone. This is followed by an estimated transition period of approximately 5.5 months to business‑as‑usual operations, resulting in a programme closure date of June 2030. The ASAP Programme Plan has been approved and baselined, with further work undertaken to strengthen planning quality across all levels of the programme. Detailed resource requirements are being developed to provide a comprehensive view of demand across the programme. Change control processes have been refined and aligned with established governance arrangements under the Senior Responsible Owner, ensuring that the impacts of any changes to the delivery model are fully understood and managed. Work is also ongoing to ensure that the programme plan reflects the integration of key enabling functions required to support effective management control, underpinned by a comprehensive reporting framework.","narrativeClaimKind":"date-mismatch","history":[{"id":"HO_0286_2324-Q2","year":2025,"name":"Asylum Support Accommodation Programme","department":"HO","category":"Government Transformation and Service Delivery","description":"The Asylum Support Accommodation Programme (ASAP) aims to establish new delivery and commercial arrangements with two objectives in mind: 1-ASAP will deliver a suite of new and transformed asylum accommodation and support services contracts as part of a wider new model of provision which is both sustainable and scalable, supported by enhanced management capabilities to operate the system more effectively. 2-To replace existing contracts (specifically Asylum Accommodation and Support Contracts (AASC), Advice, Issue Reporting and Eligibility (AIRE) and Asylum Support Payments (ASP). The accommodation being delivered through the existing AASC contracts is very expensive, the management control provided within the contracts is limited, and there is elevated risk of market failure through the current suppliers.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER. This is due to‚ Programme had a new SRO from February 2025. Although the initial resource constraints have been reduced the programme continues to require further resources as the programme grows including support for key enabler activities. Delivery Model Assessment (DMA) work is ongoing with the final report due for approval at the Programme Board on 03/06/2025. A planning workshop was held with enabling teams to reduce the forecasted Outline Business Case (OBC) delivery date to November 2025.","startDate":"2022-07-15","endDate":"2030-06-14","scheduleNarrative":"The project's end-date at 24/25-Q4 is scheduled to be 14/06/2030. This is primarily due to the following factors‚ Project closure is currently scheduled for 27/12/29 following the delivery of the Hybrid - Cluster 4 milestone and the ASAP - Hybrid Mobilisation milestone. There is an assumption that the transition to BAU will be 5.5 months in duration following delivery of the Project Closure milestone, which has generated a Programme Closure milestone date of 14/06/30. *Please note that the current plans indicate 4 clusters of delivery, however, this is very likely to change based on the requirement to adapt the delivery approach due to the introduction of new and revised commercial practices and potential outputs from current market engagement. This may be reflected in the baselining of the plan following final HMT OBC approval.","fyBaseline":4.58,"fyForecast":3.92,"fyVariance":14.41,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ Higher than expected design costs received placed a significant pressure on 2024/25 FY budget, limiting the programme’s ability to fund commercial resource requirements to complete critical activities. A Change Request for an uplift of £0.67m to the 2024/25 approved budget was approved in February 2025. Areas of underspend were driven by delays in recruitment due to uncertainty around the timing of approved funding, which impacted the programme’s ability to onboard required resources in a timely manner. Additionally, an internal recruitment freeze and challenges in securing specialist resources quickly enough further contributed to the underspend.","wholeLifeCost":72079.0,"costNarrative":"The project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) is 72079. This is primarily due to the following factors‚ This comprises of Programme costs up until 2029/30 FY and 10 year commercial contract costs up to 2038/39 FY - equating to around £6-7bn per annum.","benefits":0.0,"benefitsNarrative":"The project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) is 0. This is primarily due to the following factors‚ We have not monetised any benefits yet but will do so at Outline Business Case (OBC) stage.","themes":["Delivery & schedule","Cost & funding","Commercial & supply chain","Approvals & decisions"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER. This is due to‚ Programme had a new SRO from February 2025. Although the initial resource constraints have been reduced the programme continues to require further resources as the programme grows including support for key enabler activities. Delivery Model…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 24/25-Q4 is scheduled to be 14/06/2030. This is primarily due to the following factors‚ Project closure is currently scheduled for 27/12/29 following the delivery of the Hybrid - Cluster 4 milestone and the ASAP - Hybrid Mobilisation milestone. There is an assumption that the transition to BAU will be 5.5 months in duration following delivery of the Project Closure milestone, which has generated a Programme Closure milestone date of 14/06/30. *Please note that the current plans indicate 4 clusters of delivery, however, this is very likely to change based on the requirement to adapt the delivery approach due to the introduction of new and revised commercial practices and potential outputs from current market engagement. This may be reflected in the baselining of the plan following final HMT OBC approval.","narrativeClaimKind":null},{"id":"HO_0286_2324-Q2","year":2026,"name":"Asylum Support Accommodation Programme","department":"HO","category":"Government Transformation and Service Delivery","description":"The Asylum Support Accommodation Programme (ASAP) is focused on establishing new delivery and commercial arrangements for asylum accommodation and support services, with the aim of creating a more sustainable, scalable and effective system. The programme will deliver a suite of new and transformed contracts as part of a wider operating model, supported by enhanced management capability to improve oversight and system performance. ASAP will also replace a number of existing contracts, including the Asylum Accommodation and Support Contracts (AASC), Advice, Issue Reporting and Eligibility (AIRE), and Asylum Support Payments (ASP). This transition reflects the need to address affordability pressures, strengthen contract management, and reduce risks associated with the current delivery model.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) at 2025/26 Q4 increased to Red. This reflects the findings of a recent Programme Assurance Review (PAR), which highlighted significant delivery complexity and sustained pressure across key enabling functions. A revised Business Transformation Delivery Model has been endorsed, representing a change in project definition and requiring a period of re‑planning and re‑baselining across the programme. The programme continues to work towards submission of the OBC1 (FACT) which the PAR team will return to assess, and subject to a successful review, the programme will return to an Amber status for the OBC to be reviewed at InvestCo. In January 26, the Bridging Accommodation & Services Project (BASP) was closed as its original aims were no longer achievable. Activity is underway to establish the Collective Accommodation Management Service (CAMS) project within the scope of ASAP.","startDate":null,"endDate":"2029-12-21","scheduleNarrative":"The programme end date remains 14 June 2030 and is unchanged, reflecting current delivery and transition assumptions. Project closure is scheduled for 21 December 2029, following delivery of the Hybrid – Cluster 4 milestone and the ASAP – Hybrid Mobilisation milestone. This is followed by an estimated transition period of approximately 5.5 months to business‑as‑usual operations, resulting in a programme closure date of June 2030. The ASAP Programme Plan has been approved and baselined, with further work undertaken to strengthen planning quality across all levels of the programme. Detailed resource requirements are being developed to provide a comprehensive view of demand across the programme. Change control processes have been refined and aligned with established governance arrangements under the Senior Responsible Owner, ensuring that the impacts of any changes to the delivery model are fully understood and managed. Work is also ongoing to ensure that the programme plan reflects the integration of key enabling functions required to support effective management control, underpinned by a comprehensive reporting framework.","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"The projects departmentally agreed Benefits at 25/26 Q4 (measured in £m) is 0. The programme has not yet agreed benefits profiles, these are still being developed and will be agreed at Outline Business Case stage.","themes":["Delivery & schedule","Governance & assurance","Commercial & supply chain","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) at 2025/26 Q4 increased to Red. This reflects the findings of a recent Programme Assurance Review (PAR), which highlighted significant delivery complexity and sustained pressure across key enabling functions. A revised Business Transformation Delivery Model has been…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":true,"narrativeExcerpt":"The programme end date remains 14 June 2030 and is unchanged, reflecting current delivery and transition assumptions. Project closure is scheduled for 21 December 2029, following delivery of the Hybrid – Cluster 4 milestone and the ASAP – Hybrid Mobilisation milestone. This is followed by an estimated transition period of approximately 5.5 months to business‑as‑usual operations, resulting in a programme closure date of June 2030. The ASAP Programme Plan has been approved and baselined, with further work undertaken to strengthen planning quality across all levels of the programme. Detailed resource requirements are being developed to provide a comprehensive view of demand across the programme. Change control processes have been refined and aligned with established governance arrangements under the Senior Responsible Owner, ensuring that the impacts of any changes to the delivery model are fully understood and managed. Work is also ongoing to ensure that the programme plan reflects the integration of key enabling functions required to support effective management control, underpinned by a comprehensive reporting framework.","narrativeClaimKind":"date-mismatch"}],"previous":{"id":"HO_0286_2324-Q2","year":2025,"name":"Asylum Support Accommodation Programme","department":"HO","category":"Government Transformation and Service Delivery","description":"The Asylum Support Accommodation Programme (ASAP) aims to establish new delivery and commercial arrangements with two objectives in mind: 1-ASAP will deliver a suite of new and transformed asylum accommodation and support services contracts as part of a wider new model of provision which is both sustainable and scalable, supported by enhanced management capabilities to operate the system more effectively. 2-To replace existing contracts (specifically Asylum Accommodation and Support Contracts (AASC), Advice, Issue Reporting and Eligibility (AIRE) and Asylum Support Payments (ASP). The accommodation being delivered through the existing AASC contracts is very expensive, the management control provided within the contracts is limited, and there is elevated risk of market failure through the current suppliers.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER. This is due to‚ Programme had a new SRO from February 2025. Although the initial resource constraints have been reduced the programme continues to require further resources as the programme grows including support for key enabler activities. Delivery Model Assessment (DMA) work is ongoing with the final report due for approval at the Programme Board on 03/06/2025. A planning workshop was held with enabling teams to reduce the forecasted Outline Business Case (OBC) delivery date to November 2025.","startDate":"2022-07-15","endDate":"2030-06-14","scheduleNarrative":"The project's end-date at 24/25-Q4 is scheduled to be 14/06/2030. This is primarily due to the following factors‚ Project closure is currently scheduled for 27/12/29 following the delivery of the Hybrid - Cluster 4 milestone and the ASAP - Hybrid Mobilisation milestone. There is an assumption that the transition to BAU will be 5.5 months in duration following delivery of the Project Closure milestone, which has generated a Programme Closure milestone date of 14/06/30. *Please note that the current plans indicate 4 clusters of delivery, however, this is very likely to change based on the requirement to adapt the delivery approach due to the introduction of new and revised commercial practices and potential outputs from current market engagement. This may be reflected in the baselining of the plan following final HMT OBC approval.","fyBaseline":4.58,"fyForecast":3.92,"fyVariance":14.41,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ Higher than expected design costs received placed a significant pressure on 2024/25 FY budget, limiting the programme’s ability to fund commercial resource requirements to complete critical activities. A Change Request for an uplift of £0.67m to the 2024/25 approved budget was approved in February 2025. Areas of underspend were driven by delays in recruitment due to uncertainty around the timing of approved funding, which impacted the programme’s ability to onboard required resources in a timely manner. Additionally, an internal recruitment freeze and challenges in securing specialist resources quickly enough further contributed to the underspend.","wholeLifeCost":72079.0,"costNarrative":"The project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) is 72079. This is primarily due to the following factors‚ This comprises of Programme costs up until 2029/30 FY and 10 year commercial contract costs up to 2038/39 FY - equating to around £6-7bn per annum.","benefits":0.0,"benefitsNarrative":"The project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) is 0. This is primarily due to the following factors‚ We have not monetised any benefits yet but will do so at Outline Business Case (OBC) stage.","themes":["Delivery & schedule","Cost & funding","Commercial & supply chain","Approvals & decisions"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER. This is due to‚ Programme had a new SRO from February 2025. Although the initial resource constraints have been reduced the programme continues to require further resources as the programme grows including support for key enabler activities. Delivery Model…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 24/25-Q4 is scheduled to be 14/06/2030. This is primarily due to the following factors‚ Project closure is currently scheduled for 27/12/29 following the delivery of the Hybrid - Cluster 4 milestone and the ASAP - Hybrid Mobilisation milestone. There is an assumption that the transition to BAU will be 5.5 months in duration following delivery of the Project Closure milestone, which has generated a Programme Closure milestone date of 14/06/30. *Please note that the current plans indicate 4 clusters of delivery, however, this is very likely to change based on the requirement to adapt the delivery approach due to the introduction of new and revised commercial practices and potential outputs from current market engagement. This may be reflected in the baselining of the plan following final HMT OBC approval.","narrativeClaimKind":null},"ratingDelta":1,"transition":"Worsened","endDateDeltaDays":-175,"attentionScore":86,"attentionReasons":["Published commentary says the end date is unchanged while the published date moved","Current published delivery confidence is Red","Published rating worsened from Amber to Red","In-year forecast variance is +43.0%"]},{"id":"MOD_0135_2122-Q1","year":2026,"name":"SUBMARINE DISMANTLING PROJECT","department":"MOD","category":"Military Capability","description":"The Submarine Dismantling Project covers the preparation and execution of the safe and secure dismantling of the first defueled, decommissioned, Royal Navy submarine, Swiftsure, in Rosyth, by the end of 2026.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25-Q4, the NISTA/SRO Delivery Confidence Assessment rating at 25/26-Q4 decreased to Red. This is primarily due to the following factors. 1. The project’s novel and complex nature, which continues to present unforeseen challenges. 2. While progress is being made, ongoing prime supplier performance issues and third-party supply chain risks pose potential delays. 3. Additionally, gaps have been identified in the project’s planning, controls, and commercial arrangements, which are impacting overall delivery assurance.","startDate":"2013-03-29","endDate":"2028-10-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 increased from 31/03/2027 to 31/10/2028. This is primarily due to the following factors; The date is based on a continually maturing schedule and its achievability. This date represents the formal closure of the project and is separate from the milestone to complete the dismantling of Swiftsure by 2026.","fyBaseline":68.04,"fyForecast":57.11,"fyVariance":16.06,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factor; schedule and materials cost reprofiling.","wholeLifeCost":541.73,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) increased from £400.382 to £489.563. This is primarily due to the maturation of infrastructure and other costs.","benefits":null,"benefitsNarrative":"Compared to financial year 2024/25-Q4, the project's departmental-agreed monetised benefits at 2025/26-Q4 remained at £0m.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25-Q4, the NISTA/SRO Delivery Confidence Assessment rating at 25/26-Q4 decreased to Red. This is primarily due to the following factors. 1. The project’s novel and complex nature, which continues to present unforeseen challenges. 2. While progress is being made, ongoing prime supplier performance issues and third-party supply…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 increased from 31/03/2027 to 31/10/2028. This is primarily due to the following factors; The date is based on a continually maturing schedule and its achievability. This date represents the formal closure of the project and is separate from the milestone to complete the dismantling of Swiftsure by 2026.","narrativeClaimKind":null,"history":[{"id":"MOD_0135_2122-Q1","year":2022,"name":"Submarine Dismantling Project","department":"MOD","category":"Military Capability","description":"The Submarine Dismantling Project mandate covers preparation and execution to safely and securely dismantle the first defueled and decommissioned Royal Navy submarine in Rosyth by 2026.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Senior Responsible Owner's Delivery Confidence Assessment rating is Amber. This is primarily due to the following factors: Market conditions and general uncertainty with the novel task being undertaken means there is inherent risk to the delivery estimates.","startDate":"2013-03-29","endDate":"2026-12-31","scheduleNarrative":"The project end-date is 31 December 2026. This is primarily due to the following factors: The Programme entered the Government Major Projects Portfolio in Financial Year 2021/22, as such there is no baseline date recorded for March 21 for comparison.","fyBaseline":33.73,"fyForecast":33.73,"fyVariance":0.0,"varianceNarrative":"The budget variance is inferior or equal to 5%.","wholeLifeCost":278.0,"costNarrative":"The project's Baseline Whole Life Cost is 277.66 (£M). This is primarily due to the following factors: The cost remains uncertain until The Ministry of Defence has proven this \"first of its kind\" dismantling process on the demonstrator submarine, with a scheduled completion date in 2026. These costs are subject to annual review.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Governance & assurance"],"evidenceExcerpt":"The Senior Responsible Owner's Delivery Confidence Assessment rating is Amber. This is primarily due to the following factors: Market conditions and general uncertainty with the novel task being undertaken means there is inherent risk to the delivery estimates. The project end-date is 31 December 2026. This is primarily due to the following factors: The…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project end-date is 31 December 2026. This is primarily due to the following factors: The Programme entered the Government Major Projects Portfolio in Financial Year 2021/22, as such there is no baseline date recorded for March 21 for comparison.","narrativeClaimKind":null},{"id":"MOD_0135_2122-Q1","year":2023,"name":"Submarine Dismantling Project","department":"MOD","category":"Military Capability","description":"The Submarine Dismantling Project mandate covers preparation and execution to safely and securely dismantle the first defueled and decommissioned Royal Navy submarine in Rosyth by 2026.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 21/22-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. The project is continuing to progress in line with its maturing schedule, however, this is a ground breaking programme and learning by doing encounters difficulty and challenge that cannot necessarily be planned for.","startDate":"2013-03-29","endDate":"2026-12-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2026-12-31. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 31/12/2026.The date is based on a maturing deterministic schedule and its achievability will become clearer over the next 12 months.","fyBaseline":33.39,"fyForecast":33.18,"fyVariance":-1.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":298.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 increased from 278m. to 298m. This is primarily due to the following factors. An increase in number of employees required to complete the work and the impact of inflation e.g. the rising cost of materials.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This programme does not report cashable benefits. Its aim is to provision the armed forces with the equipment and / or infrastructure required.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. The project is continuing to progress in line with its maturing schedule, however, this is a ground breaking programme and learning by doing encounters difficulty and…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2026-12-31. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 31/12/2026.The date is based on a maturing deterministic schedule and its achievability will become clearer over the next 12 months.","narrativeClaimKind":null},{"id":"MOD_0135_2122-Q1","year":2024,"name":"Submarine Dismantling Project","department":"MOD","category":"Military Capability","description":"The Submarine Dismantling Project covers the preparation and execution of safely and securely dismantling the first defueled and decommissioned Royal Navy submarine, in Rosyth, by 2026.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The project is continuing to progress in line with its maturing schedule, however, this is a novel and complex project and learning by doing encounters difficulty and challenge that cannot necessarily be planned for.","startDate":"2013-03-29","endDate":"2027-03-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 is scheduled to finish on 2027-03-31. The date is based on a maturing schedule and its achievability. This date represents the formal closure of the project and is separate from the milestone to complete the dismantling of Swiftsure by 2026.","fyBaseline":48.49,"fyForecast":42.31,"fyVariance":-12.745,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. Labour and materials cost reprofiling.","wholeLifeCost":362.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 increased from 298m. to 362m. This is primarily due to the following factors. An increase in the number of employees required to complete the work and the impact of inflation e.g. the rising cost of materials.","benefits":0.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 0m.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The project is continuing to progress in line with its maturing schedule, however, this is a novel and complex project and learning by doing encounters difficulty and…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 is scheduled to finish on 2027-03-31. The date is based on a maturing schedule and its achievability. This date represents the formal closure of the project and is separate from the milestone to complete the dismantling of Swiftsure by 2026.","narrativeClaimKind":null},{"id":"MOD_0135_2122-Q1","year":2025,"name":"SUBMARINE DISMANTLING PROJECT","department":"MoD","category":"Military Capability","description":"The Submarine Dismantling Project covers the preparation and execution of the safe and secure dismantling of the first de-fueled and decommissioned Royal Navy submarine, Swiftsure, in Rosyth, by 2026.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. The project is continuing to progress in line with its maturing schedule. However, this is a novel and complex project which can encounter challenges that cannot necessarily be planned for.","startDate":"2013-03-29","endDate":"2027-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2027.","fyBaseline":64.47,"fyForecast":53.22,"fyVariance":17.46,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. This is due to schedule and materials cost re-profiling.","wholeLifeCost":400.38,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 362 to 400. This is primarily due to the following factors. The maturation of infrastructure costs.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. The project is continuing to progress in line with its maturing schedule. However, this is a novel and complex project which can encounter challenges that cannot necessarily be planned for. Compared to…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2027.","narrativeClaimKind":null},{"id":"MOD_0135_2122-Q1","year":2026,"name":"SUBMARINE DISMANTLING PROJECT","department":"MOD","category":"Military Capability","description":"The Submarine Dismantling Project covers the preparation and execution of the safe and secure dismantling of the first defueled, decommissioned, Royal Navy submarine, Swiftsure, in Rosyth, by the end of 2026.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25-Q4, the NISTA/SRO Delivery Confidence Assessment rating at 25/26-Q4 decreased to Red. This is primarily due to the following factors. 1. The project’s novel and complex nature, which continues to present unforeseen challenges. 2. While progress is being made, ongoing prime supplier performance issues and third-party supply chain risks pose potential delays. 3. Additionally, gaps have been identified in the project’s planning, controls, and commercial arrangements, which are impacting overall delivery assurance.","startDate":"2013-03-29","endDate":"2028-10-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 increased from 31/03/2027 to 31/10/2028. This is primarily due to the following factors; The date is based on a continually maturing schedule and its achievability. This date represents the formal closure of the project and is separate from the milestone to complete the dismantling of Swiftsure by 2026.","fyBaseline":68.04,"fyForecast":57.11,"fyVariance":16.06,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factor; schedule and materials cost reprofiling.","wholeLifeCost":541.73,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) increased from £400.382 to £489.563. This is primarily due to the maturation of infrastructure and other costs.","benefits":null,"benefitsNarrative":"Compared to financial year 2024/25-Q4, the project's departmental-agreed monetised benefits at 2025/26-Q4 remained at £0m.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25-Q4, the NISTA/SRO Delivery Confidence Assessment rating at 25/26-Q4 decreased to Red. This is primarily due to the following factors. 1. The project’s novel and complex nature, which continues to present unforeseen challenges. 2. While progress is being made, ongoing prime supplier performance issues and third-party supply…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 increased from 31/03/2027 to 31/10/2028. This is primarily due to the following factors; The date is based on a continually maturing schedule and its achievability. This date represents the formal closure of the project and is separate from the milestone to complete the dismantling of Swiftsure by 2026.","narrativeClaimKind":null}],"previous":{"id":"MOD_0135_2122-Q1","year":2025,"name":"SUBMARINE DISMANTLING PROJECT","department":"MoD","category":"Military Capability","description":"The Submarine Dismantling Project covers the preparation and execution of the safe and secure dismantling of the first de-fueled and decommissioned Royal Navy submarine, Swiftsure, in Rosyth, by 2026.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. The project is continuing to progress in line with its maturing schedule. However, this is a novel and complex project which can encounter challenges that cannot necessarily be planned for.","startDate":"2013-03-29","endDate":"2027-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2027.","fyBaseline":64.47,"fyForecast":53.22,"fyVariance":17.46,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. This is due to schedule and materials cost re-profiling.","wholeLifeCost":400.38,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 362 to 400. This is primarily due to the following factors. The maturation of infrastructure costs.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. The project is continuing to progress in line with its maturing schedule. However, this is a novel and complex project which can encounter challenges that cannot necessarily be planned for. Compared to…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2027.","narrativeClaimKind":null},"ratingDelta":1,"transition":"Worsened","endDateDeltaDays":580,"attentionScore":85,"attentionReasons":["Current published delivery confidence is Red","Published rating worsened from Amber to Red","Published end date moved 580 days later","In-year forecast variance is +16.1%"]},{"id":"MOD_0120_2021-Q2","year":2026,"name":"E7 WEDGETAIL","department":"MOD","category":"Military Capability","description":"The E-7 Wedgetail programme will provide a 5th generation Airborne Early Warning and Control (AEW and C) capability, with a Multi-role Electronically Scanned Array sensor, which is interoperable and interchangeable with key allies with an anticipated Out-of-Service date of at least 2042.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Red. This is primarily due to the following factors. 1. Several factors have caused delays to the Programme’s In-Service Date and subsequent milestones. 2. The delays are the result of contractor performance and schedule optimism bias, challenges within the global supply chain, retention of an appropriately skilled workforce at the modification facility and an increase in certification complexity and requirements.","startDate":"2018-05-08","endDate":"2030-07-01","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 31/12/2027. This is primarily due to the following factors. 1. Although the reported end date remains unchanged from Q4 24/25, milestones are being revised through a programme rebaselining exercise.","fyBaseline":133.12,"fyForecast":62.76,"fyVariance":52.85,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors: 1. The schedule delays in the Programme have led to a reprofiling of the in-year finances leading to a reduced spend this year compared to the budget.","wholeLifeCost":2128.05,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) decreased from £1962M to £1937M. This is primarily due to the following factors. 1. Updated estimate of costs following modelling of the latest price proposal.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Red. This is primarily due to the following factors. 1. Several factors have caused delays to the Programme’s In-Service Date and subsequent milestones. 2. The delays are the result of contractor performance and schedule optimism bias,…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":true,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 31/12/2027. This is primarily due to the following factors. 1. Although the reported end date remains unchanged from Q4 24/25, milestones are being revised through a programme rebaselining exercise.","narrativeClaimKind":"date-mismatch","history":[{"id":"MOD_0120_2021-Q2","year":2021,"name":"E7 Wedgetail","department":"MOD","category":"Military Capability","description":"The E-7 Wedgetail programme will provide a 5th Generation Airborne Early Warning and Control capability, with an Electronically Scanned Array radar, that is interoperable and interchangeable with key allies to an anticipated Out-of-Service date of at least 2042. The intent of the E-7 Wedgetail programme is to recapitalise the UK Airborne Warning And Control System E-3D Fleet with a modern Airborne Early Warning and Control platform having a target In Service Date of 2023. It will provide an airborne surveillance and C2 capability that can meet environmental and regulatory changes. The Programme will deliver a capability that can meet NATO and Coalition Theatre Entry Standards, meet the UK's contribution-in-kind to the NATO Airborne Early Warning Force and be interoperable and interchangeable with key allies. It will also effectively communicate with and enable 4th, 5th and future Generation Assets in order to successfully compete and contest against near-peer adversaries. It has been confirmed that, with minor modifications (detailed in the Outline Business Case), the Boeing E-7 Wedgetail meets the Ministry Of Defences initial capability requirements and Key User Requirements.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 26 of the Freedom of Information Act 2000 (Defence)","startDate":"2018-05-08","endDate":"2026-06-30","scheduleNarrative":"The project end-date is 30 June 2026. This is primarily due to the following factors: The Wedgetail Programme is currently working through the implications of the 2021 Integrated Review. The programme remains on track to deliver an In Service Date of 2023, however, negotiations with the Prime Contractor are ongoing to optimise the schedule for a reduced fleet size and a change of Main Operating Base to RAF Lossiemouth.","fyBaseline":329.44,"fyForecast":352.82,"fyVariance":7.0,"varianceNarrative":"The budget variance exceeds 5%. Most significant reasons for variances are changes in foreign exchange rates during the year, and bring-forward of Financial Year 2021/22 costs due to some aspects of the programme being ahead of schedule (no overall change to programme costs).","wholeLifeCost":2245.67,"costNarrative":"The projects Baseline Whole Life Cost is �2245.67m. This is primarily due to the following factors: Original Whole Life Costs were estimated for the Outline Business Case based on Rough Order Magnitude data provided by Boeing, and were a factor in the investment decision to procure E-7 Wedgetail rather than upgrading the existing E-3D Sentry aircraft. This original figure is based on 5 aircraft based at RAF Waddington. In 2021 the project was re-baselined to deliver 3 aircraft based at RAF Lossiemouth, to achieve colocation synergies with the P8-A Poseidon fleet and provide a cost saving. Estimated Whole Life Costs for the reduced fleet size will be updated at Full Business Case in Q3 2022, when approval for the initial sustainment contract will be sought.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Commercial & supply chain"],"evidenceExcerpt":"Exempt under Section 26 of the Freedom of Information Act 2000 (Defence) The project end-date is 30 June 2026. This is primarily due to the following factors: The Wedgetail Programme is currently working through the implications of the 2021 Integrated Review. The programme remains on track to deliver an In Service Date of 2023, however, negotiations with…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project end-date is 30 June 2026. This is primarily due to the following factors: The Wedgetail Programme is currently working through the implications of the 2021 Integrated Review. The programme remains on track to deliver an In Service Date of 2023, however, negotiations with the Prime Contractor are ongoing to optimise the schedule for a reduced fleet size and a change of Main Operating Base to RAF Lossiemouth.","narrativeClaimKind":null},{"id":"MOD_0120_2021-Q2","year":2022,"name":"E7 Wedgetail","department":"MOD","category":"Military Capability","description":"The E-7 Wedgetail programme will provide a 5th generation Airborne Early Warning and Control capability, with a Multi-role Electronically Scanned Array radar, that is interoperable and interchangeable with key allies to an anticipated Out-of-Service date of at least 2042.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating increased from Amber/Red to Amber. This is primarily due to the following factors: The removal of the incremental Amber/Red and Amber/Green assessment ratings. The Defence in a Competitive Age Command Paper (CP411) published in March 2021 confirmed that the RAF would procure three aircraft and move the main operating base to RAF Lossiemouth. It has therefore been necessary to renegotiate terms with Boeing Defence (UK).","startDate":"2018-05-08","endDate":"2027-06-01","scheduleNarrative":"Compared to 2021-Q4, the project end-date increased from 30 June 26 to 1 June 27 This is primarily due to the following factors: Correction of published position in March 21. The programme continues to forecast an end date of 30 June 26. Work continues to finalise the programme schedule following the 2020 Integrated Defence Review decision.","fyBaseline":408.72,"fyForecast":446.69,"fyVariance":9.0,"varianceNarrative":"The budget variance exceeds 5%.The reason for this was the bring forward of costs from future years.","wholeLifeCost":1895.0,"costNarrative":"Compared to 2021-Q4, the projects Baseline Whole Life Cost has reduced by £351M (£2245.674M at Q4 20/21 and £1895.153M at Q4 21/22). This is primarily due to the following factors: The Defence in a Competitive Age Command Paper (CP411) published in March 2021 confirmed that the RAF would procure three aircraft.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating increased from Amber/Red to Amber. This is primarily due to the following factors: The removal of the incremental Amber/Red and Amber/Green assessment ratings. The Defence in a Competitive Age Command Paper (CP411) published in March 2021…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to 2021-Q4, the project end-date increased from 30 June 26 to 1 June 27 This is primarily due to the following factors: Correction of published position in March 21. The programme continues to forecast an end date of 30 June 26. Work continues to finalise the programme schedule following the 2020 Integrated Defence Review decision.","narrativeClaimKind":null},{"id":"MOD_0120_2021-Q2","year":2023,"name":"E7 Wedgetail","department":"MOD","category":"Military Capability","description":"The E-7 Wedgetail programme will provide a 5th generation Airborne Early Warning and Control capability, with a Multi-role Electronically Scanned Array radar that is interoperable and interchangeable with key allies to an anticipated Out-of-Service date of at least 2042.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber (SRO rating). This is primarily due to the following factors. The Wedgetail Programme is in the manufacture phase with all three aircraft in modification at STS Aviation (Birmingham). The first aircraft was fitted with its distinctive Multi-role Electronically Scanned Array sensor in September 2022. However, continued challenges within the global supply chain are preventing progress towards a Green rating.","startDate":"2018-05-08","endDate":"2027-06-01","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2027-06-01. This is primarily due to the following factors. The Wedgetail Programme is expected to reach Full Operating Capability in 2026, with the milestone date to be approved in the Full Business Case. As a result, the Programme end-date will be amended as refined by the Integrated Master Schedule.","fyBaseline":198.53,"fyForecast":205.1,"fyVariance":3.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":1877.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 decreased from 1895m. to 1877m. This is primarily due to the following factors. The final Programme estimate of Whole-Life Cost will be presented in the Full Business Case. The current Whole Life Cost has reduced due to the transfer of domestic infrastructure funding requirement to Air Infrastructure and the Lossiemouth Development Programme.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This programme does not report cashable benefits. Its aim is to provision the armed forces with the equipment and / or infrastructure required.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber (SRO rating). This is primarily due to the following factors. The Wedgetail Programme is in the manufacture phase with all three aircraft in modification at STS Aviation (Birmingham). The first aircraft was fitted with its distinctive Multi-role…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2027-06-01. This is primarily due to the following factors. The Wedgetail Programme is expected to reach Full Operating Capability in 2026, with the milestone date to be approved in the Full Business Case. As a result, the Programme end-date will be amended as refined by the Integrated Master Schedule.","narrativeClaimKind":null},{"id":"MOD_0120_2021-Q2","year":2024,"name":"E7 Wedgetail","department":"MOD","category":"Military Capability","description":"The E-7 Wedgetail programme will provide a 5th generation Airborne Early Warning and Control (AEW and C) capability, with a Multi-role Electronically Scanned Array radar, that is interoperable and interchangeable with key allies to an anticipated Out-of-Service date of at least 2042.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure and Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 decreased from Amber to Red. This is primarily due to the following factors. There are affordability and equipment delivery schedule risks and issues. These will be addressed in the Full Business Case that is planned for submission to the Approving Authority in the first half of Financial Year 24/25.","startDate":"2018-05-08","endDate":"2027-06-01","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained scheduled to finish on 2027-06-01. This is primarily due to the following factors. Although unchanged from last year, the Programme’s scheduled end date is currently seeking revision as challenges within the global supply chain, retention of an appropriately skilled workforce at the modification facility and an increase in certification complexity in the aviation sector has caused delays to the In Service Date.","fyBaseline":247.51,"fyForecast":248.5,"fyVariance":0.4,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":2053.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 increased from 1877m to 2053m. This is primarily due to the following factors. The result of more budget being released to match the forecast costs of the Programme. The WLC figure presented at Q4 23/24 is within the current Approved Budgetary Level for the Programme which remains unchanged from Q4 22/23. The final WLC will be included in the Programme’s Full Business Case.","benefits":0.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 0m.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure and Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 decreased from Amber to Red. This is primarily due to the following factors. There are affordability and equipment delivery schedule risks and issues. These will be addressed in the Full Business Case that is planned for…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained scheduled to finish on 2027-06-01. This is primarily due to the following factors. Although unchanged from last year, the Programme’s scheduled end date is currently seeking revision as challenges within the global supply chain, retention of an appropriately skilled workforce at the modification facility and an increase in certification complexity in the aviation sector has caused delays to the In Service Date.","narrativeClaimKind":null},{"id":"MOD_0120_2021-Q2","year":2025,"name":"E7 WEDGETAIL","department":"MoD","category":"Military Capability","description":"The E-7 Wedgetail programme will provide a 5th generation Airborne Early Warning and Control (AEW and C) capability, with a Multi-role Electronically Scanned Array sensor, which is interoperable and interchangeable with key allies with an anticipated Out-of-Service date of at least 2042.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Project's Delivery Confidence Assessment rating at 24/25-Q4 is RED, compared with the Infrastructure and Projects Authority's assessment last year of RED. This is due to the following factors. Whilst a sufficient budget was issued to the SRO, the delay in obtaining final approval of the Full Business Case is impacting across several areas of the Programme, particularly the sustainment contract.","startDate":"2018-05-08","endDate":"2027-12-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 01/06/2027 to 31/12/2027. This is primarily due to the following factors. Challenges within the global supply chain, retention of an appropriately skilled workforce at the modification facility and an increase in certification complexity and requirements has caused delays to the In-Service Date and subsequent milestones. As the aircraft completes its modification, the certification schedule is emerging as the critical path.","fyBaseline":183.33,"fyForecast":86.95,"fyVariance":52.57,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. Defence financial challenges and internal spend commitment controls have led to a different spend profile to that initially envisaged.","wholeLifeCost":1962.75,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 2053 to 1962. This is primarily due to the following factors. This is primarily as a consequence of programme contextual changes in the aircraft acquisition contract.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Approvals & decisions"],"evidenceExcerpt":"The Project's Delivery Confidence Assessment rating at 24/25-Q4 is RED, compared with the Infrastructure and Projects Authority's assessment last year of RED. This is due to the following factors. Whilst a sufficient budget was issued to the SRO, the delay in obtaining final approval of the Full Business Case is impacting across several areas of the…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 01/06/2027 to 31/12/2027. This is primarily due to the following factors. Challenges within the global supply chain, retention of an appropriately skilled workforce at the modification facility and an increase in certification complexity and requirements has caused delays to the In-Service Date and subsequent milestones. As the aircraft completes its modification, the certification schedule is emerging as the critical path.","narrativeClaimKind":null},{"id":"MOD_0120_2021-Q2","year":2026,"name":"E7 WEDGETAIL","department":"MOD","category":"Military Capability","description":"The E-7 Wedgetail programme will provide a 5th generation Airborne Early Warning and Control (AEW and C) capability, with a Multi-role Electronically Scanned Array sensor, which is interoperable and interchangeable with key allies with an anticipated Out-of-Service date of at least 2042.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Red. This is primarily due to the following factors. 1. Several factors have caused delays to the Programme’s In-Service Date and subsequent milestones. 2. The delays are the result of contractor performance and schedule optimism bias, challenges within the global supply chain, retention of an appropriately skilled workforce at the modification facility and an increase in certification complexity and requirements.","startDate":"2018-05-08","endDate":"2030-07-01","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 31/12/2027. This is primarily due to the following factors. 1. Although the reported end date remains unchanged from Q4 24/25, milestones are being revised through a programme rebaselining exercise.","fyBaseline":133.12,"fyForecast":62.76,"fyVariance":52.85,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors: 1. The schedule delays in the Programme have led to a reprofiling of the in-year finances leading to a reduced spend this year compared to the budget.","wholeLifeCost":2128.05,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) decreased from £1962M to £1937M. This is primarily due to the following factors. 1. Updated estimate of costs following modelling of the latest price proposal.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Red. This is primarily due to the following factors. 1. Several factors have caused delays to the Programme’s In-Service Date and subsequent milestones. 2. The delays are the result of contractor performance and schedule optimism bias,…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":true,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 31/12/2027. This is primarily due to the following factors. 1. Although the reported end date remains unchanged from Q4 24/25, milestones are being revised through a programme rebaselining exercise.","narrativeClaimKind":"date-mismatch"}],"previous":{"id":"MOD_0120_2021-Q2","year":2025,"name":"E7 WEDGETAIL","department":"MoD","category":"Military Capability","description":"The E-7 Wedgetail programme will provide a 5th generation Airborne Early Warning and Control (AEW and C) capability, with a Multi-role Electronically Scanned Array sensor, which is interoperable and interchangeable with key allies with an anticipated Out-of-Service date of at least 2042.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Project's Delivery Confidence Assessment rating at 24/25-Q4 is RED, compared with the Infrastructure and Projects Authority's assessment last year of RED. This is due to the following factors. Whilst a sufficient budget was issued to the SRO, the delay in obtaining final approval of the Full Business Case is impacting across several areas of the Programme, particularly the sustainment contract.","startDate":"2018-05-08","endDate":"2027-12-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 01/06/2027 to 31/12/2027. This is primarily due to the following factors. Challenges within the global supply chain, retention of an appropriately skilled workforce at the modification facility and an increase in certification complexity and requirements has caused delays to the In-Service Date and subsequent milestones. As the aircraft completes its modification, the certification schedule is emerging as the critical path.","fyBaseline":183.33,"fyForecast":86.95,"fyVariance":52.57,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. Defence financial challenges and internal spend commitment controls have led to a different spend profile to that initially envisaged.","wholeLifeCost":1962.75,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 2053 to 1962. This is primarily due to the following factors. This is primarily as a consequence of programme contextual changes in the aircraft acquisition contract.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Approvals & decisions"],"evidenceExcerpt":"The Project's Delivery Confidence Assessment rating at 24/25-Q4 is RED, compared with the Infrastructure and Projects Authority's assessment last year of RED. This is due to the following factors. Whilst a sufficient budget was issued to the SRO, the delay in obtaining final approval of the Full Business Case is impacting across several areas of the…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 01/06/2027 to 31/12/2027. This is primarily due to the following factors. Challenges within the global supply chain, retention of an appropriately skilled workforce at the modification facility and an increase in certification complexity and requirements has caused delays to the In-Service Date and subsequent milestones. As the aircraft completes its modification, the certification schedule is emerging as the critical path.","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":913,"attentionScore":82,"attentionReasons":["Published commentary says the end date is unchanged while the published date moved","Current published delivery confidence is Red","Published end date moved 913 days later","In-year forecast variance is +52.9%"]},{"id":"DFT_0033_1819-Q1","year":2026,"name":"EAST COAST MAINLINE PROGRAMME","department":"DFT","category":"Infrastructure and Construction","description":"A collection of track and power upgrade schemes between London King's Cross and Edinburgh to increase capacity and to enable the introduction of the Azuma fleet and a recast route timetable.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The route's recast timetable - required to deliver the benefits of the programme - was introduced successfully in December 2025. This was not able to accommodate all of the services envisaged in the programme's business case in 2018, and so work is now underway to re-baseline the benefits of the investment.","startDate":"2014-04-01","endDate":"2027-05-03","scheduleNarrative":"The infrastructure enhancements required to enable introduction of the recast timetable were completed successfully to schedule. Remaining works are for resilience purposes only, and scheduled for completion in May 2027.","fyBaseline":null,"fyForecast":21.68,"fyVariance":null,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":1276.49,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 increased from £1114m to £1122m. This is primarily due to increased costs associated with remaining power supply upgrade works on the route.","benefits":2028.11,"benefitsNarrative":"Following introduction of the route's recast timetable, work is now underway to reappraise the benefits of the programme, which will be recorded once this work is complete.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Scope & requirements"],"evidenceExcerpt":"The route's recast timetable - required to deliver the benefits of the programme - was introduced successfully in December 2025. This was not able to accommodate all of the services envisaged in the programme's business case in 2018, and so work is now underway to re-baseline the benefits of the investment. The infrastructure enhancements required to enable…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The infrastructure enhancements required to enable introduction of the recast timetable were completed successfully to schedule. Remaining works are for resilience purposes only, and scheduled for completion in May 2027.","narrativeClaimKind":null,"history":[{"id":"DFT_0033_1819-Q1","year":2020,"name":"East Coast Mainline Programme","department":"DFT","category":"Infrastructure and Construction","description":"Improving capacity and frequency of the services on the East Coast Mainline, increasing passenger seat capacity to major stations along the route, reducing journey times and improving the customer experience through the introduction of new trains.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber, which has declined since last year�s Q2 1819 Amber/Green, due primarily to the following factors; - Realisation of the Programme's benefits is dependent upon the East Coast franchise's introduction of InterCity Express Programme trains and the delivery of those trains has been delayed. The final train deliveries are now expected in Summer 2020. - The IPA anticipated that the digital signalling project between London and Peterborough would be incorporated into the East Coast Mainline Programme in November 2019, increasing the complexity of the Programme. Since the Q2 1920 (30th September 2019) Amber IPA DCA, the following non-project operating environment activities have impacted the original Q2 IPA DCA; - COVID-19 will delay the delivery of engineering works and is likely to mean the planned introduction of the new East Coast Mainline timetable in December 2021 is deferred. The prolongation and replanning of these activities will increase costs and delay the realisation of the Programme's benefits. - The digital signalling project will not be incorporated into the East Coast Main Line Programme but will be delivered as a separate scheme later in the 2020s. Since the Q2 1920 (30th September 2019) Amber IPA DCA, the following primary project actions have impacted the original Q2 IPA DCA; - As a result of COVID-19, engineering works to remodel the track layout King's Cross Station have been delayed. The project needs to replan the works. There is a risk that the introduction of the new East Coast timetable will need to be deferred from December 2021. - The storms experienced in early 2020, combined with the impact of COVID-19, mean that critical works on the Werrington Grade Separation project have been delayed, putting the entry into service date of this enhancement at risk. The project team needs to replan the works.","startDate":"2014-04-01","endDate":"2023-12-01","scheduleNarrative":"The scheduled baseline project end date at Q2 1920 (30th September 2019) is 01/12/23, has not changed since last year's Q2 1819 date of 01/12/23, due primarily to the following factors; - At Q2 19/20, all of the projects that enable the new East Coast timetable to be introduced were forecast to be completed at least six months before the timetable change date. - A planning group has been established to develop the new East Coast timetable and at Q2 19/20 its work was proceeding to schedule. Since the Q2 1920 (30th September 2019) baseline project end date of 01/12/23, the following non-project operating environment activities have impacted the original Q2 baseline project end date; - Although COVID-19 will delay engineering works and is likely to delay the introduction of the new East Coast timetable, the Programme's end date is defined by the completion of power supply upgrades. These upgrades could still be completed in 2023, meaning the Programme's end date remains achievable. Since the Q2 1920 (30th September 2019) baseline project end date of 01/12/23, the following primary project actions have impacted the original Q2 baseline project end date; - The project needs to be replan the delivery of the engineering works delayed as a result of COVID-19 and confirm when the new East Coast Main Line timetable will be implemented. - The project is liaising with power distribution companies to confirm the timescales for completion of the new connections that are needed to the National Grid.","fyBaseline":208.8,"fyForecast":166.7,"fyVariance":-20.0,"varianceNarrative":"The 19/20 in-year baseline / forecast variance at Q2 1920 (30th September 2019) of -20%, is due primarily to the following factors; - Contracts for power supply upgrades were due to be awarded in August 2019 but this was delayed until 2020 because the tender prices received were higher than expected and further contract negotiations were needed. - The 19/20 in-year forecast underspend would have been greater than 20% but the Stevenage turnback project has been accelerated, bringing forward those costs from 20/21. Since the Q2 1920 (30th September 2019) 19/20 in-year baseline / forecast variance of -20%, the following non-project operating environment activities have impacted the original Q2 19/20 in-year baseline / forecast variance; - The variance has not been affected by non-project operating environment activities. Since the Q2 1920 (30th September 2019) 19/20 in-year baseline / forecast variance of -20%, the following primary project actions have impacted the original Q2 19/20 in-year variance; - Since Q2, project team revisions to forecast costs have reduced the Programme-level variance for the year to an underspend of 17%. - Funding was approved in December 2019 to enable power supply upgrade enabling works to start ahead of full contract award and reduce the in-year underspend.","wholeLifeCost":1040.4,"costNarrative":"The baseline Whole Life Cost at Q2 1920 (30th September 2019) is �1,040.40 m, has increased by �0.03 m since last year's Q2 1819 (�m) baseline Whole Life Cost of �1,040.37 m, due primarily to the following factors; - The baseline Whole Life Cost for the Programme has not changed but the figure reported at Q2 1920 was rounded to the nearest �100k. - The cost of the power supply upgrades between Doncaster and York has not been finalised due to ongoing contract negotiations with suppliers. When these costs have been confirmed, the baseline Whole Life Cost for the Programme will be updated. Since the Q2 1920 (30th September 2019) �1,040.40 m baseline Whole Life Cost, the following non-project operating environment activities have impacted the original baseline Q2 Whole Life Cost; - COVID-19 will delay the delivery of projects and introduction of new timetable. The prolongation and replanning of works is expected to increase costs and mean the benefits of the Programme are introduced later than planned. The Programme will need to be re-baselined when the implications of the virus have been fully assessed. Since the Q2 1920 (30th September 2019) �1,040.40 m baseline Whole Life Cost, the following primary project actions have impacted the original Q2 baseline Whole Life Cost; - Network Rail needs to quantify the cost implications of the COVID-19 delays on each project. - The total cost of the East Coast Main Line power supply upgrades is being finalised with the supply chain.","benefits":null,"benefitsNarrative":"","themes":["Delivery & schedule","Cost & funding","Technical & integration","Commercial & supply chain"],"evidenceExcerpt":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber, which has declined since last year�s Q2 1819 Amber/Green, due primarily to the following factors; - Realisation of the Programme's benefits is dependent upon the East Coast franchise's introduction of InterCity Express Programme trains and the delivery of those…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2020","sourceLabel":"IPA Annual Report 2019-20","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The scheduled baseline project end date at Q2 1920 (30th September 2019) is 01/12/23, has not changed since last year's Q2 1819 date of 01/12/23, due primarily to the following factors; - At Q2 19/20, all of the projects that enable the new East Coast timetable to be introduced were forecast to be completed at least six months before the timetable change date. - A planning group has been established to develop the new East Coast timetable and at Q2 19/20 its work was proceeding to schedule. Since the Q2 1920 (30th September 2019) baseline project end date of 01/12/23, the following non-project operating environment activities have impacted the original Q2 baseline project end date; - Although COVID-19 will delay engineering works and is likely to delay the introduction of the new East Coast timetable, the Programme's end date is defined by the completion of power supply upgrades. These upgrades could still be completed in 2023, meaning the Programme's end date remains achievable. Since the Q2 1920 (30th September 2019) baseline project end date of 01/12/23, the following primary project actions have impacted the original Q2 baseline project end date; - The project needs to be replan the delivery of the engineering works delayed as a result of COVID-19 and confirm when the new East Coast Main Line timetable will be implemented. - The project is liaising with power distribution companies to confirm the timescales for completion of the new connections that are needed to the National Grid.","narrativeClaimKind":null},{"id":"DFT_0033_1819-Q1","year":2021,"name":"East Coast Mainline Programme","department":"DFT","category":"Infrastructure and Construction","description":"The East Coast Main Line Enhancement Programme is a collection of track and power upgrade schemes between London King's Cross and Edinburgh to increase capacity and to enable the introduction of the Intercity Express trains through the East Coast franchise.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber. This is primarily due to the following factors: Although good progress has been made with the delivery of the infrastructure upgrades, the project's Amber rating reflects the challenging schedule for developing the new East Coast Main Line timetable for introduction in May 2022. The Department is working with Network Rail and operating companies to agree pragmatic solutions and trade-offs to deliver the best outcomes for passengers and freight customers.","startDate":"2014-04-01","endDate":"2024-12-01","scheduleNarrative":"Compared to financial year 19/20-Q2, the project's end-date increased from 01 December 2023 to 01 December 2024 . This is primarily due to the following factors: The major milestone of timetable upgrade to reflect new paths/capacity was delayed from December 2021 due to the COVID lockdown leading to delays in infrastructure work. In addition, power supply upgrades north of Newcastle are not forecast to be completed until 2024 because the tender prices received for the works were higher than expected and further negotiations were needed, delaying the award of the contract. Operational mitigations will enable the new timetable to be introduced, improving passenger services, before the power upgrades are completed.","fyBaseline":224.9,"fyForecast":197.7,"fyVariance":-12.0,"varianceNarrative":"The budget variance exceeds 5%. The delay in awarding the contract for power supply upgrades resulted in costs moving out of 2020/21 into subsequent years.","wholeLifeCost":1040.4,"costNarrative":"Compared to financial year 19/20-Q2, the projects Baseline Whole Life Cost remained at �1040.40m. This is primarily due to the following factors: The baseline whole life cost for the project has not changed.","benefits":null,"benefitsNarrative":"","themes":["Delivery & schedule","Cost & funding","Commercial & supply chain","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber. This is primarily due to the following factors: Although good progress has been made with the delivery of the infrastructure upgrades, the project's Amber rating reflects the challenging schedule for developing the new East…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 19/20-Q2, the project's end-date increased from 01 December 2023 to 01 December 2024 . This is primarily due to the following factors: The major milestone of timetable upgrade to reflect new paths/capacity was delayed from December 2021 due to the COVID lockdown leading to delays in infrastructure work. In addition, power supply upgrades north of Newcastle are not forecast to be completed until 2024 because the tender prices received for the works were higher than expected and further negotiations were needed, delaying the award of the contract. Operational mitigations will enable the new timetable to be introduced, improving passenger services, before the power upgrades are completed.","narrativeClaimKind":null},{"id":"DFT_0033_1819-Q1","year":2022,"name":"East Coast Mainline Programme","department":"DFT","category":"Infrastructure and Construction","description":"The East Coast Main Line Enhancement Programme is a collection of track and power upgrade schemes between London King's Cross and Edinburgh to increase capacity and reduce journey times. The Programme has enabled the East Coast franchise to introduce a new fleet of Intercity Express trains.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 20/21-Q4, the Delivery Confidence Assessment rating at 21/22-Q4 remained at Amber. Although the majority of the necessary infrastructure upgrades have now been completed, the Programme's Amber rating reflects the challenging schedule for finalising the new East Coast Main Line timetable, led by the Department's Passenger Services team, and securing the necessary approvals ahead of the planned introduction in May 2023. The decision to defer the introduction of the new timetable from May 2022 was taken, in part, to give the Department, Network Rail and the train operating companies time to address the feedback received from the public consultation on the proposed changes that was carried out in 2021.","startDate":"2014-04-01","endDate":"2024-12-01","scheduleNarrative":"Compared to 2021-Q4, your project end-date remained scheduled to finish on 01 DEC 2024 . This is primarily due to the following factors: The power supply upgrades remain forecast to be completed in 2024 but, with power draw mitigations in place, the rail industry is planning to introduce a new East Coast Main Line timetable in May 2023 to increase the number of passenger services and reduce journey times. There are a number of risks to the achievement of this milestone, including completing the development of the timetable and delivering two essential, but small-scale, infrastructure upgrades before the change.","fyBaseline":137.5,"fyForecast":104.14,"fyVariance":-25.0,"varianceNarrative":"The Programme underspent its 2021/22 budget by 24% primarily because of delays to the power supply upgrades and a proportion of those costs moving into later years. The delays were principally due to the redesign work needed to satisfy a change in interface requirements from the electricity Distribution Network Operators and archaeological discoveries at a worksite near Marshall Meadows.","wholeLifeCost":1040.0,"costNarrative":"Compared to 2021-Q4,the projects Baseline Whole Life Cost remained at 1040.40 (£m). This is primarily due to the following factors: The baseline whole life cost for the project has not changed and forecast costs remain within the funding range agreed with HM Treasury for the delivery of the Programme.","benefits":null,"benefitsNarrative":"","themes":["Delivery & schedule","Cost & funding","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Delivery Confidence Assessment rating at 21/22-Q4 remained at Amber. Although the majority of the necessary infrastructure upgrades have now been completed, the Programme's Amber rating reflects the challenging schedule for finalising the new East Coast Main Line timetable, led by the Department's Passenger Services…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to 2021-Q4, your project end-date remained scheduled to finish on 01 DEC 2024 . This is primarily due to the following factors: The power supply upgrades remain forecast to be completed in 2024 but, with power draw mitigations in place, the rail industry is planning to introduce a new East Coast Main Line timetable in May 2023 to increase the number of passenger services and reduce journey times. There are a number of risks to the achievement of this milestone, including completing the development of the timetable and delivering two essential, but small-scale, infrastructure upgrades before the change.","narrativeClaimKind":null},{"id":"DFT_0033_1819-Q1","year":2023,"name":"East Coast Mainline Programme","department":"DFT","category":"Infrastructure and Construction","description":"The East Coast Main Line Enhancement Programme is a collection of track and power upgrade schemes between London King's Cross and Edinburgh to increase capacity and reduce journey times. The Programme has enabled the East Coast franchise to introduce a new fleet of Intercity Express trains.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 21/22-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. Although the majority of the necessary infrastructure upgrades have now been completed, the Programme's Amber rating reflects the challenging schedule for finalising the content of the new East Coast Main Line timetable, led by the Department's Passenger Services team, and securing the necessary approvals ahead of its introduction, which will not be before June 2024 .","startDate":"2014-04-01","endDate":"2024-12-01","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2024-12-01. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2024-12-01. This is primarily due to the following factors. The power supply upgrades remain forecast to be completed by December 2024 but, with mitigations in place, the rail industry could introduce a new East Coast Main Line timetable from June 2024 to increase the number of passenger services and reduce journey times. The introduction of the new timetable is dependent upon agreement of the train service specification and funding for the operation of those services.","fyBaseline":15.1,"fyForecast":79.49,"fyVariance":426.0,"varianceNarrative":"Programme costs in 2022/23 were significantly higher than the baseline because delays to the power supply upgrades led to costs moving from earlier years; total costs have not changed. The delays were principally due to the redesign work needed to satisfy a change in interface requirements from the electricity Distribution Network Operators and archaeological discoveries at a worksite near Berwick.","wholeLifeCost":1040.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 remained at 1040m. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 remained at 1040m. This is primarily due to the following factors. The baseline whole life cost for the project has not changed and forecast costs remain within the funding range agreed with HM Treasury for the delivery of the Programme.","benefits":2953.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 2953m. The benefits baseline assumed that the new East Coast Main Line timetable would be introduced in May 2021 but, due to the impact of the pandemic on the rail industry's finances, its implementation has been deferred until June 2024 at the earliest. When the content of the new timetable and its date of introduction have been agreed, the passenger benefits achieved by the Programme will need to be reappraised.","themes":["Cost & funding","Delivery & schedule","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. Although the majority of the necessary infrastructure upgrades have now been completed, the Programme's Amber rating reflects the challenging schedule for finalising the…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2024-12-01. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2024-12-01. This is primarily due to the following factors. The power supply upgrades remain forecast to be completed by December 2024 but, with mitigations in place, the rail industry could introduce a new East Coast Main Line timetable from June 2024 to increase the number of passenger services and reduce journey times. The introduction of the new timetable is dependent upon agreement of the train service specification and funding for the operation of those services.","narrativeClaimKind":null},{"id":"DFT_0033_1819-Q1","year":2024,"name":"East Coast Mainline Programme","department":"DFT","category":"Infrastructure and Construction","description":"The East Coast Main Line Enhancements Programme is a collection of track and power upgrade schemes between London King's Cross and Edinburgh to increase capacity and reduce journey times. The Programme has enabled the East Coast franchise to introduce a new fleet of Intercity Express trains.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. Although all of the infrastructure upgrades required to operate the new East Coast Main Line timetable have now been delivered, the Programme's Amber rating reflects the challenging schedule for agreeing and finalising the timetable specification. This activity is being led by the Department's Passenger Services team, and, as of 31/03/24, implementation will not be before December 2024.","startDate":"2014-04-01","endDate":"2025-06-02","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 increased from 2024-12-01 to 2025-06-02. This is primarily due to the following factors. Whilst the power supply upgrades required to operate the new timetable have now been delivered, the remaining interventions (required for route resilience purposes) are now forecast for completion in June 2025.","fyBaseline":0.0,"fyForecast":68.94,"fyVariance":null,"varianceNarrative":"Programme costs in 2023/24 were significantly higher than the baseline because delays to the power supply upgrades led to costs moving from earlier years; total Programme costs remain within the approved budget.","wholeLifeCost":1040.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 remained at 1040m. This is primarily due to the following factors. The baseline whole life cost for the project has not changed and forecast costs remain within the funding range agreed with HM Treasury for the delivery of the Programme.","benefits":2953.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 2953m. The benefits baseline assumed that the new East Coast Main Line timetable would be introduced in May 2021 but, due to the impact of the pandemic on the rail industry's finances, its implementation has been deferred until December 2024 at the earliest. When the content of the new timetable and its date of introduction have been agreed, the passenger benefits achieved by the Programme will be reforecast.","themes":["Cost & funding","Delivery & schedule","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. Although all of the infrastructure upgrades required to operate the new East Coast Main Line timetable have now been delivered, the Programme's Amber rating reflects the…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 increased from 2024-12-01 to 2025-06-02. This is primarily due to the following factors. Whilst the power supply upgrades required to operate the new timetable have now been delivered, the remaining interventions (required for route resilience purposes) are now forecast for completion in June 2025.","narrativeClaimKind":null},{"id":"DFT_0033_1819-Q1","year":2025,"name":"EAST COAST MAINLINE PROGRAMME","department":"DfT","category":"Infrastructure and Construction","description":"A programme of infrastructure works, the East Coast Main Line Enhancements Programme aims to realise the benefits of LNER's deployment of their new Azuma rolling stock. The intended outcomes of this Programme are: • Long Distance High Speed (LDHS) seating capacity into London increased by 38% from approximately 2019s 2900 to 3950 seats per hour at peak times; • Train service frequency increased from 6 to 8 LDHS between London King's Cross and Doncaster and from 5 to 6 passenger services between Doncaster and Newcastle per hour; • Maintain freight capacity for current and Freight Market Study forecast demand, using diversionary routes as far as practicable; and • A reduction in journey times for the fastest LDHS services in each hour to 4 hours between London and Edinburgh and 2 hours between London and Leeds.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The infrastructure upgrades required to introduce the route's recast timetable have now been delivered, but implementation of that timetable - originally proposed for 2021 - has been delayed on a number of occasions. It is now planned for introduction in December 2025, although a number of irresolvable conflicts across the route mean it will not be possible to realise the full benefits originally forecast.","startDate":"2014-04-01","endDate":"2026-06-02","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 02/06/2025 to 02/06/2026. This is primarily due to the following factors‚ Whilst the power supply upgrades required to enable introduction of the route's recast timetable are now complete, delivery of remaining power interventions - required for route resilience purposes only - have been pushed back due to commissioning delays caused by National Grid resourcing constraints. Close engagement is continuing between Network Rail and National Grid to learn lessons from these challenges, with ECML, Midland Main Line, and other national electrification projects contributing. Work also continues to explore ways in which the new forecast completion date can be brought forward.","fyBaseline":25.65,"fyForecast":24.0,"fyVariance":6.43,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The aforementioned delays to commissioning of the remaining power supply upgrades has meant that some of the spend associated with those works has been moved from FY24/25 into FY25/26. This movement has been agreed through the Department's Portolio management.","wholeLifeCost":1040.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 1040. This is primarily due to the following factors‚ The Programme has an approved budget of up to £1,230m, which includes Network Rail's contingency and DfT's assessment of optimism bias totalling £305m. A number of risks have materialised, costs have increased due to Covid-19, and minor additional scope added to the Programme, so the forecast spend is now £74m more than the baseline cost of £1,040m. The Department and Network Rail are working to ensure that remaining upgrades are delivered as cost effectively as possible.","benefits":2953.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 2953. This is primarily due to the following factors‚ Programme benefits are dependent upon introduction of a recast route timetable. The benefits baseline assumed that this would be introduced in May 2021, but, due to the impact of the pandemic on the rail industry's finances, its implementation has been deferred. We are now planning for its introduction in December 2025, and when its final contents have been formally agreed the full benefits of the Programme will be reforecast. A high-level analysis has estimated that 26% of the planned passenger benefits have already been realised through incremental improvements to the existing timetable. The remaining benefits will be delivered when the new timetable is implemented, and we estimate that the Programme's BCR will remain above 2 (high value for money).","themes":["Cost & funding","Delivery & schedule","Scope & requirements","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The infrastructure upgrades required to introduce the route's recast timetable have now been delivered, but implementation of that timetable - originally proposed for…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 02/06/2025 to 02/06/2026. This is primarily due to the following factors‚ Whilst the power supply upgrades required to enable introduction of the route's recast timetable are now complete, delivery of remaining power interventions - required for route resilience purposes only - have been pushed back due to commissioning delays caused by National Grid resourcing constraints. Close engagement is continuing between Network Rail and National Grid to learn lessons from these challenges, with ECML, Midland Main Line, and other national electrification projects contributing. Work also continues to explore ways in which the new forecast completion date can be brought forward.","narrativeClaimKind":null},{"id":"DFT_0033_1819-Q1","year":2026,"name":"EAST COAST MAINLINE PROGRAMME","department":"DFT","category":"Infrastructure and Construction","description":"A collection of track and power upgrade schemes between London King's Cross and Edinburgh to increase capacity and to enable the introduction of the Azuma fleet and a recast route timetable.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The route's recast timetable - required to deliver the benefits of the programme - was introduced successfully in December 2025. This was not able to accommodate all of the services envisaged in the programme's business case in 2018, and so work is now underway to re-baseline the benefits of the investment.","startDate":"2014-04-01","endDate":"2027-05-03","scheduleNarrative":"The infrastructure enhancements required to enable introduction of the recast timetable were completed successfully to schedule. Remaining works are for resilience purposes only, and scheduled for completion in May 2027.","fyBaseline":null,"fyForecast":21.68,"fyVariance":null,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":1276.49,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 increased from £1114m to £1122m. This is primarily due to increased costs associated with remaining power supply upgrade works on the route.","benefits":2028.11,"benefitsNarrative":"Following introduction of the route's recast timetable, work is now underway to reappraise the benefits of the programme, which will be recorded once this work is complete.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Scope & requirements"],"evidenceExcerpt":"The route's recast timetable - required to deliver the benefits of the programme - was introduced successfully in December 2025. This was not able to accommodate all of the services envisaged in the programme's business case in 2018, and so work is now underway to re-baseline the benefits of the investment. The infrastructure enhancements required to enable…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The infrastructure enhancements required to enable introduction of the recast timetable were completed successfully to schedule. Remaining works are for resilience purposes only, and scheduled for completion in May 2027.","narrativeClaimKind":null}],"previous":{"id":"DFT_0033_1819-Q1","year":2025,"name":"EAST COAST MAINLINE PROGRAMME","department":"DfT","category":"Infrastructure and Construction","description":"A programme of infrastructure works, the East Coast Main Line Enhancements Programme aims to realise the benefits of LNER's deployment of their new Azuma rolling stock. The intended outcomes of this Programme are: • Long Distance High Speed (LDHS) seating capacity into London increased by 38% from approximately 2019s 2900 to 3950 seats per hour at peak times; • Train service frequency increased from 6 to 8 LDHS between London King's Cross and Doncaster and from 5 to 6 passenger services between Doncaster and Newcastle per hour; • Maintain freight capacity for current and Freight Market Study forecast demand, using diversionary routes as far as practicable; and • A reduction in journey times for the fastest LDHS services in each hour to 4 hours between London and Edinburgh and 2 hours between London and Leeds.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The infrastructure upgrades required to introduce the route's recast timetable have now been delivered, but implementation of that timetable - originally proposed for 2021 - has been delayed on a number of occasions. It is now planned for introduction in December 2025, although a number of irresolvable conflicts across the route mean it will not be possible to realise the full benefits originally forecast.","startDate":"2014-04-01","endDate":"2026-06-02","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 02/06/2025 to 02/06/2026. This is primarily due to the following factors‚ Whilst the power supply upgrades required to enable introduction of the route's recast timetable are now complete, delivery of remaining power interventions - required for route resilience purposes only - have been pushed back due to commissioning delays caused by National Grid resourcing constraints. Close engagement is continuing between Network Rail and National Grid to learn lessons from these challenges, with ECML, Midland Main Line, and other national electrification projects contributing. Work also continues to explore ways in which the new forecast completion date can be brought forward.","fyBaseline":25.65,"fyForecast":24.0,"fyVariance":6.43,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The aforementioned delays to commissioning of the remaining power supply upgrades has meant that some of the spend associated with those works has been moved from FY24/25 into FY25/26. This movement has been agreed through the Department's Portolio management.","wholeLifeCost":1040.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 1040. This is primarily due to the following factors‚ The Programme has an approved budget of up to £1,230m, which includes Network Rail's contingency and DfT's assessment of optimism bias totalling £305m. A number of risks have materialised, costs have increased due to Covid-19, and minor additional scope added to the Programme, so the forecast spend is now £74m more than the baseline cost of £1,040m. The Department and Network Rail are working to ensure that remaining upgrades are delivered as cost effectively as possible.","benefits":2953.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 2953. This is primarily due to the following factors‚ Programme benefits are dependent upon introduction of a recast route timetable. The benefits baseline assumed that this would be introduced in May 2021, but, due to the impact of the pandemic on the rail industry's finances, its implementation has been deferred. We are now planning for its introduction in December 2025, and when its final contents have been formally agreed the full benefits of the Programme will be reforecast. A high-level analysis has estimated that 26% of the planned passenger benefits have already been realised through incremental improvements to the existing timetable. The remaining benefits will be delivered when the new timetable is implemented, and we estimate that the Programme's BCR will remain above 2 (high value for money).","themes":["Cost & funding","Delivery & schedule","Scope & requirements","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The infrastructure upgrades required to introduce the route's recast timetable have now been delivered, but implementation of that timetable - originally proposed for…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 02/06/2025 to 02/06/2026. This is primarily due to the following factors‚ Whilst the power supply upgrades required to enable introduction of the route's recast timetable are now complete, delivery of remaining power interventions - required for route resilience purposes only - have been pushed back due to commissioning delays caused by National Grid resourcing constraints. Close engagement is continuing between Network Rail and National Grid to learn lessons from these challenges, with ECML, Midland Main Line, and other national electrification projects contributing. Work also continues to explore ways in which the new forecast completion date can be brought forward.","narrativeClaimKind":null},"ratingDelta":1,"transition":"Worsened","endDateDeltaDays":335,"attentionScore":79,"attentionReasons":["Current published delivery confidence is Red","Published rating worsened from Amber to Red","Published end date moved 335 days later"]},{"id":"MOD_0107_1617-Q1","year":2026,"name":"PROTECTOR","department":"MOD","category":"Military Capability","description":"Protector will provide a certified Remotely Piloted Air System with enhanced capabilities (to 2040). Protector will provide armed, long range, persistent wide area surveillance with various sensors and be based at RAF Waddington in Lincolnshire.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Red. This is primarily due to the following factors. 1. Although Protector has received the financial approval required to achieve the Initial Operating Capability this year, the programme is awaiting approval for a Review Note which proposes a re-baselining of milestones and a route to a Green rating. 2. Furthermore, sufficiently trained crew numbers, Full Motion Video metadata dissemination issues and weapons testing delays are contributing to reduced Delivery Confidence.","startDate":"2009-04-30","endDate":"2030-06-30","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 30/06/2026. This is primarily due to the following factors. 1. Although the reported end date remains unchanged from Q4 24/25, the programme is awaiting approval for a Review Note which will revise all future milestones including the project end date.","fyBaseline":134.39,"fyForecast":89.51,"fyVariance":33.4,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors: 1. Significant underspend due to directed savings deferrals and spend commitment restrictions.","wholeLifeCost":1732.77,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) increased from £1523M to £1565M. This is primarily due to the following factors. 1. Protector Availability and Support Solution contract award and amendment of the budget numbers to reflect that. 2. Delays of Ground Support Equipment acquisition for in-service/IOC based on item lead times. 3. Reprofile of the Direct Commercial Sales 2 (DCS2) contract. 4.Costs increases driven by revised estimate of DCS2 for Rev E deliverables.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Approvals & decisions","Commercial & supply chain","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Red. This is primarily due to the following factors. 1. Although Protector has received the financial approval required to achieve the Initial Operating Capability this year, the programme is awaiting approval for a Review Note which…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":true,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 30/06/2026. This is primarily due to the following factors. 1. Although the reported end date remains unchanged from Q4 24/25, the programme is awaiting approval for a Review Note which will revise all future milestones including the project end date.","narrativeClaimKind":"date-mismatch","history":[{"id":"MOD_0107_1617-Q1","year":2020,"name":"PROTECTOR","department":"MOD","category":"Military Capability","description":"Delivery of a Remotely Piloted Air System.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber, which has improved since last year�s Q2 1819 Amber/Red, due primarily to the following factors; - The improved confidence is attributable to the re-baseline of the Programme and approval of the Review Note with adjusted Control Total by Investment Appraisal Committee Outletter on 8 April 19. This made the programme affordable and approved an adjusted timeline for Initial Operating Capability and Full Operational Capability and incorporated a 28 month slip. - Confidence was also injected into the Programme g when the Direct Commercial Sales 2 Test & Evaluation Contract Milestone was achieved in Sep 19. Award of the infrastructure Phase 1 contract to Boeing UK as well as a number of successful smaller contracts and Critical Design Reviews have also boosted confidence. - A steady increase in overall Reaper Force crew numbers has also improved confidence: this has been brought about by improved retention; Royal Australian Air Force exchange officers; and a pathway to using contractors to relieve Royal Air Force personnel at the deployed location. This gave more confidence that the 45 Reaper crews needed for Transition to Protector would be achieved by end 2020. Since the Q2 1920 (30th September 2019) Amber IPA DCA, the following non-project operating environment activities have impacted the original Q2 IPA DCA; - The RAF Phase 1, 2 and 3 training has been impacted by the restrictions imposed due to COVID-19. The effect on the Reaper Force crew numbers and, by extension, the transition to Protector is not yet clear. Since the Q2 1920 (30th September 2019) Amber IPA DCA, the following primary project actions have impacted the original Q2 IPA DCA; - DE&S will act as the Delivery Team for the Protector Infrastructure project at RAF Waddington. An exemption from using the Defence Infrastructure Organisation was granted in June 2019. The Protector facility project has been combined with that of E-7 Wedgetail, this has allowed for efficiencies of design by creating shared spaces and use of a joint contracting strategy. - The solution for the Synthetic Training System has been changed to ensure compliance and compatibility with Air's collective synthetic training programme. The impact to the programme cost and schedule are now understood and the amended solution will deliver an excellent capability. This item is still on the critical path but is now progressing. - A contract for crews for the Reaper Launch and Recovery Element based at the deployed location (known as UK1) will take effect in June 2020. This will allow up to seven RAF crews (21 people) to be relieved from the forward deployed location and return to home units, boosting the numbers of crews available for mission control towards the 45 that will be needed for transition to Protector.","startDate":"2009-04-30","endDate":"2035-03-31","scheduleNarrative":"The scheduled baseline project end date at Q2 1920 (30th September 2019) is 31/03/35, has not changed since last year's Q2 1819 date of 31/03/35, due primarily to the following factors; - baseline project end date did not change because this reflects the expected length of time that Protector will be in RAF service. - Baseline end date did not change because Protector is planned to be in RAF Service for 14.3 years after Initial Operating Capability is declared. Since the Q2 1920 (30th September 2019) baseline project end date of 31/03/35, the following primary project actions have impacted the original Q2 baseline project end date; - The programme was rebaselined following approval of a Review Note by IAC in April 2019 to reflect a slip to the Initial Operating Capability date. This has moved the end date to 31 Mar 2038. - The reporting has now been updated to show the re-baselined Out of Service Date of 31 Mar 2038, this is 14.3 years after the new Initial Operating Capability date of Nov 2023.","fyBaseline":127.37,"fyForecast":140.35,"fyVariance":10.0,"varianceNarrative":"The 19/20 in-year baseline / forecast variance at Q2 1920 (30th September 2019) of 10%, is due primarily to the following factors; - Unfavourable foreign exchange accounts for almost all of the In Year variance - A small variance in year was attributable to slightly increased costs in the Direct Commercial Sales Contract 1 that was signed in Aug 2019. Since the Q2 1920 (30th September 2019) 19/20 in-year baseline / forecast variance of 10%, the following non-project operating environment activities have impacted the original Q2 19/20 in-year baseline / forecast variance; - foreign exchange movements continue to change the variance. Since the Q2 1920 (30th September 2019) 19/20 in-year baseline / forecast variance of 10%, the following primary project actions have impacted the original Q2 19/20 in-year variance; - A small underspend in the Detect and Avoid Capability project was caused by a slower-than-forecast route to approvals for this new project that meant the funds could not be spent In Year.","wholeLifeCost":1155.84,"costNarrative":"The baseline Whole Life Cost at Q2 1920 (30th September 2019) is �1,155.84 m, has increased by �116.59 m since last year's Q2 1819 (�m) baseline Whole Life Cost of �1,039.25 m, due primarily to the following factors; - Increased Whole Life cost was caused when the Programme was rebaselined in April 2019 and was slipped by 28 months. This necessitated the renegotiation of contracts at a cost. This increase in cost was the subject of an Accounting Officers Assessment published in Nov 2019. - The rebaseline of the programme also allowed for the capability sustainment of the Multi-Spectral Targeting System from version B to version D in order to deliver the minimum Theatre standard and to manage obsolescence. This increased the Whole Life costs of the Programme. Since the Q2 1920 (30th September 2019) �1,155.84 m baseline Whole Life Cost, the following non-project operating environment activities have impacted the original baseline Q2 Whole Life Cost; - Foreign Exchange Rate (FOREX) US$ /UK� challenges have increased the forecast through life costs of the Programme.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Workforce & capability","Commercial & supply chain","Delivery & schedule"],"evidenceExcerpt":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber, which has improved since last year�s Q2 1819 Amber/Red, due primarily to the following factors; - The improved confidence is attributable to the re-baseline of the Programme and approval of the Review Note with adjusted Control Total by Investment Appraisal…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2020","sourceLabel":"IPA Annual Report 2019-20","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The scheduled baseline project end date at Q2 1920 (30th September 2019) is 31/03/35, has not changed since last year's Q2 1819 date of 31/03/35, due primarily to the following factors; - baseline project end date did not change because this reflects the expected length of time that Protector will be in RAF service. - Baseline end date did not change because Protector is planned to be in RAF Service for 14.3 years after Initial Operating Capability is declared. Since the Q2 1920 (30th September 2019) baseline project end date of 31/03/35, the following primary project actions have impacted the original Q2 baseline project end date; - The programme was rebaselined following approval of a Review Note by IAC in April 2019 to reflect a slip to the Initial Operating Capability date. This has moved the end date to 31 Mar 2038. - The reporting has now been updated to show the re-baselined Out of Service Date of 31 Mar 2038, this is 14.3 years after the new Initial Operating Capability date of Nov 2023.","narrativeClaimKind":null},{"id":"MOD_0107_1617-Q1","year":2021,"name":"Protector","department":"MOD","category":"Military Capability","description":"Protector will provide a certified remotely piloted air system with enhanced capabilities (to 2038) over those currently provided by the in-service Reaper air system.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 26 of the Freedom of Information Act 2000 (Defence)","startDate":"2009-04-30","endDate":"2038-03-30","scheduleNarrative":"Compared to financial year 19/20-Q2, the project's end-date increased from 31 March 2035 to 30 March 2038 . This is primarily due to the following factors: The schedule remains on track to deliver an In Service Date in 2023 following the programme being re-baselined through approval of a Review Note in April 2019 to reflect a slip to the Initial Operating Capability date. This has moved the Out of Service Date to 31 Mar 2038.","fyBaseline":149.84,"fyForecast":154.85,"fyVariance":3.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":1347.06,"costNarrative":"Compared to financial year 19/20-Q2, the projects Baseline Whole Life Cost increased from �1155.84m to �1347.06m. This is primarily due to the following factors: Inclusion of Detect and Avoid, foreign exchange increases and extension of the Delivery Phase of the programme.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Exempt under Section 26 of the Freedom of Information Act 2000 (Defence) Compared to financial year 19/20-Q2, the project's end-date increased from 31 March 2035 to 30 March 2038 . This is primarily due to the following factors: The schedule remains on track to deliver an In Service Date in 2023 following the programme being re-baselined through approval of…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 19/20-Q2, the project's end-date increased from 31 March 2035 to 30 March 2038 . This is primarily due to the following factors: The schedule remains on track to deliver an In Service Date in 2023 following the programme being re-baselined through approval of a Review Note in April 2019 to reflect a slip to the Initial Operating Capability date. This has moved the Out of Service Date to 31 Mar 2038.","narrativeClaimKind":null},{"id":"MOD_0107_1617-Q1","year":2022,"name":"PROTECTOR","department":"MOD","category":"Military Capability","description":"Protector will provide a certified remotely piloted air system with enhanced capabilities (to 2038) over those currently provided by the in-service Reaper air system. Protector will provide an armed, long range, persistent wide area surveillance with various sensors and be based at RAF Waddington in Lincolnshire.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating increased from Amber/Red to Amber. This is primarily due to the following factors. The removal of the incremental Amber/Green and Amber/Red assessment ratings. The Programme continues to work with its Defence Lines of Development, particularly within Equipment, Infrastructure and Information to progress towards the key milestones.","startDate":"2009-04-30","endDate":"2038-03-30","scheduleNarrative":"Compared to 2021-Q4, the project end-date remained scheduled to finish on 30 March 38. This is primarily due to the following factors:","fyBaseline":378.73,"fyForecast":285.31,"fyVariance":-24.0,"varianceNarrative":"The budget variance exceeds 5%. This is principally due to the following: Infrastructure re-profiling for Strategic Facility and Additional Single Living Accommodation, Fluctuations in Foreign Exchange Rates, Contractor driven re-profiling and review of management reserve, Removal of the Protector Detect and Avoid funding requirement.","wholeLifeCost":1517.0,"costNarrative":"Compared to 2021-Q4, the projects Baseline Whole Life Cost has increased by £170M (£1347.06M at Q4 20/21 and £1517.125M at Q4 21/22). This is primarily due to the following factors: The inclusion in the Control Total of the UK Strategic Command Protector Enhance costings and the change in the Full Operating Capability milestone date. The effect of the latter has been to draw more of the related support costs into the overall delivery element of the programme.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating increased from Amber/Red to Amber. This is primarily due to the following factors. The removal of the incremental Amber/Green and Amber/Red assessment ratings. The Programme continues to work with its Defence Lines of Development, particularly…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to 2021-Q4, the project end-date remained scheduled to finish on 30 March 38. This is primarily due to the following factors:","narrativeClaimKind":null},{"id":"MOD_0107_1617-Q1","year":2023,"name":"PROTECTOR","department":"MOD","category":"Military Capability","description":"Protector will provide a certified remotely piloted air system with enhanced capabilities (to 2038) over those currently provided by the in-service Reaper air system. Protector will provide an armed, long range, persistent wide area surveillance with various sensors and be based at RAF Waddington in Lincolnshire.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 21/22-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. Despite significant challenges, particularly relating to Equipment, Infrastructure and Information Defence Lines of Development, the Programme continues to manage risks and work through mitigations to progress towards the key milestones. However there are considerable increased costs for the planned Programme technical infrastructure at RAF Waddington. A contingency plan to deliver Initial Operating Capability utilising existing Infrastructure is underway and pending approval. Compounded with delays to critical software development, this has led to a delay in the Programme. In response, it is planned to re-baseline the Programme milestones and seek an increase to the Approved Budgetary Limit.","startDate":"2009-04-30","endDate":"2038-03-30","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2038-03-30. This is primarily due to the following factors. NA","fyBaseline":235.34,"fyForecast":241.84,"fyVariance":3.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":1345.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 decreased from 1517m. to 1345m. This is primarily due to the following factors. Removal of the costs for the Enhance Maritime element which is now accounted for separately.The Review Note for Protector that will re-baseline the Programme will capture, and fairly attribute cost growth as appropriate, to programmatic and macro-economic factors that have affected the delivery and affordability of the programme.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This programme does not report cashable benefits. Its aim is to provision the armed forces with the equipment and / or infrastructure required.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. Despite significant challenges, particularly relating to Equipment, Infrastructure and Information Defence Lines of Development, the Programme continues to manage risks and…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2038-03-30. This is primarily due to the following factors. NA","narrativeClaimKind":null},{"id":"MOD_0107_1617-Q1","year":2024,"name":"PROTECTOR","department":"MOD","category":"Military Capability","description":"Protector will provide a certified remotely piloted air system with enhanced capabilities (to 2040) over those currently provided by the inservice Reaper air system. Protector will provide armed, long range, persistent wide area surveillance with various sensors and be based at RAF Waddington in Lincolnshire.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure and Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 decreased from Amber to Red. This is primarily due to the following factors. Despite significant challenges, particularly relating to Equipment, Infrastructure and Information Defence Lines of Development, the Protector programme maintained its Amber Delivery Confidence Assessment and continued to manage risks and work through mitigations to progress towards the key milestones. Following the December 23 Gateway 0/4 (Strategic Assessment/Readiness for Service) Review, the Delivery Confidence has been moved to Red in response to a delay in receiving approval to re-baseline the Programme’s milestones and provides the route to Green.","startDate":"2009-04-30","endDate":"2026-06-30","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 decreased from 2038-03-30 to 2026-06-30. This is primarily due to the following factors. The programme previously reported the Out of Service Date as the project end date. In accordance with IPA guidance, the end date now reflects the point after Full Operating Capability (FOC) has been achieved and the Programme transferred to Business as Usual and graduated from the GMPP.","fyBaseline":222.82,"fyForecast":153.43,"fyVariance":-31.142,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. Slippage in both the Protector Main and Enhance Protector Programmes partially offset by FOREX adjustments against the main programme.","wholeLifeCost":1463.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 increased from 1345m to 1463m. This is primarily due to the following factors. This is primarily due to the following factors. The Review Note has captured and fairly attributed cost growth as appropriate, to programmatic and macro-economic factors that have affected the delivery and affordability of the Programme. Foreign Exchange Rate increases are a significant factor for the cost growth.","benefits":0.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 0m.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure and Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 decreased from Amber to Red. This is primarily due to the following factors. Despite significant challenges, particularly relating to Equipment, Infrastructure and Information Defence Lines of Development, the Protector programme…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 decreased from 2038-03-30 to 2026-06-30. This is primarily due to the following factors. The programme previously reported the Out of Service Date as the project end date. In accordance with IPA guidance, the end date now reflects the point after Full Operating Capability (FOC) has been achieved and the Programme transferred to Business as Usual and graduated from the GMPP.","narrativeClaimKind":null},{"id":"MOD_0107_1617-Q1","year":2025,"name":"PROTECTOR","department":"MoD","category":"Military Capability","description":"Protector will provide a certified Remotely Piloted Air System with enhanced capabilities (to 2040) over those currently provided by the in-service Reaper air system. Protector will provide armed, long range, persistent wide area surveillance with various sensors and be based at RAF Waddington in Lincolnshire.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at RED. This is primarily due to the following factors. Although Protector has received the financial approval required to achieve the Initial Operating Capability (Intelligence, Surveillance, and Reconnaissance) milestone later this year, the programme is awaiting approval for a Review Note which proposes a re-baselining of milestones and a route to a Green rating. Furthermore, workforce shortages and weapons testing delays are contributing to reduced Delivery Confidence.","startDate":"2009-04-30","endDate":"2026-06-30","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 30/06/2026. This is primarily due to the following factors. No change in project end-date.","fyBaseline":138.66,"fyForecast":87.57,"fyVariance":36.84,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. Significant underspend due to directed savings deferrals and spend commitment restrictions.","wholeLifeCost":1523.18,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 1463 to 1523. This is primarily due to the following factors. Foreign Exchange Rate increases, inflation, and the acceleration of future capability enhancements has resulted in an increase in the Programme’s costs for which an uplift in the Approved Budgetary Level is being sought.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at RED. This is primarily due to the following factors. Although Protector has received the financial approval required to achieve the Initial Operating Capability (Intelligence, Surveillance, and Reconnaissance) milestone later this year, the programme is…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 30/06/2026. This is primarily due to the following factors. No change in project end-date.","narrativeClaimKind":null},{"id":"MOD_0107_1617-Q1","year":2026,"name":"PROTECTOR","department":"MOD","category":"Military Capability","description":"Protector will provide a certified Remotely Piloted Air System with enhanced capabilities (to 2040). Protector will provide armed, long range, persistent wide area surveillance with various sensors and be based at RAF Waddington in Lincolnshire.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Red. This is primarily due to the following factors. 1. Although Protector has received the financial approval required to achieve the Initial Operating Capability this year, the programme is awaiting approval for a Review Note which proposes a re-baselining of milestones and a route to a Green rating. 2. Furthermore, sufficiently trained crew numbers, Full Motion Video metadata dissemination issues and weapons testing delays are contributing to reduced Delivery Confidence.","startDate":"2009-04-30","endDate":"2030-06-30","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 30/06/2026. This is primarily due to the following factors. 1. Although the reported end date remains unchanged from Q4 24/25, the programme is awaiting approval for a Review Note which will revise all future milestones including the project end date.","fyBaseline":134.39,"fyForecast":89.51,"fyVariance":33.4,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors: 1. Significant underspend due to directed savings deferrals and spend commitment restrictions.","wholeLifeCost":1732.77,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) increased from £1523M to £1565M. This is primarily due to the following factors. 1. Protector Availability and Support Solution contract award and amendment of the budget numbers to reflect that. 2. Delays of Ground Support Equipment acquisition for in-service/IOC based on item lead times. 3. Reprofile of the Direct Commercial Sales 2 (DCS2) contract. 4.Costs increases driven by revised estimate of DCS2 for Rev E deliverables.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Approvals & decisions","Commercial & supply chain","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Red. This is primarily due to the following factors. 1. Although Protector has received the financial approval required to achieve the Initial Operating Capability this year, the programme is awaiting approval for a Review Note which…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":true,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 30/06/2026. This is primarily due to the following factors. 1. Although the reported end date remains unchanged from Q4 24/25, the programme is awaiting approval for a Review Note which will revise all future milestones including the project end date.","narrativeClaimKind":"date-mismatch"}],"previous":{"id":"MOD_0107_1617-Q1","year":2025,"name":"PROTECTOR","department":"MoD","category":"Military Capability","description":"Protector will provide a certified Remotely Piloted Air System with enhanced capabilities (to 2040) over those currently provided by the in-service Reaper air system. Protector will provide armed, long range, persistent wide area surveillance with various sensors and be based at RAF Waddington in Lincolnshire.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at RED. This is primarily due to the following factors. Although Protector has received the financial approval required to achieve the Initial Operating Capability (Intelligence, Surveillance, and Reconnaissance) milestone later this year, the programme is awaiting approval for a Review Note which proposes a re-baselining of milestones and a route to a Green rating. Furthermore, workforce shortages and weapons testing delays are contributing to reduced Delivery Confidence.","startDate":"2009-04-30","endDate":"2026-06-30","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 30/06/2026. This is primarily due to the following factors. No change in project end-date.","fyBaseline":138.66,"fyForecast":87.57,"fyVariance":36.84,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. Significant underspend due to directed savings deferrals and spend commitment restrictions.","wholeLifeCost":1523.18,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 1463 to 1523. This is primarily due to the following factors. Foreign Exchange Rate increases, inflation, and the acceleration of future capability enhancements has resulted in an increase in the Programme’s costs for which an uplift in the Approved Budgetary Level is being sought.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at RED. This is primarily due to the following factors. Although Protector has received the financial approval required to achieve the Initial Operating Capability (Intelligence, Surveillance, and Reconnaissance) milestone later this year, the programme is…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 30/06/2026. This is primarily due to the following factors. No change in project end-date.","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":1461,"attentionScore":78,"attentionReasons":["Published commentary says the end date is unchanged while the published date moved","Current published delivery confidence is Red","Published end date moved 1,461 days later","In-year forecast variance is +33.4%"]},{"id":"HO_0149_2223-Q2","year":2026,"name":"ASYLUM ACCOMMODATION PROGRAMME (AAP)","department":"HO","category":"Government Transformation and Service Delivery","description":"Asylum Accommodation Programme (AAP) increases the availability of safe and compliant asylum accommodation to meet statutory demand and reduce reliance on contingency hotel use. It will support a managed transition away from hotels, in line with the Government’s wider policy commitments.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared with Q4 2024/25, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at Q4 2025/26 remains Amber. This reflects broadly stable progress against the delivery plan, alongside ongoing dependencies and approvals. Progress remains in line with plans, with the surveys required to inform site planning and delivery now commissioned. As the programme progresses, timely approval across multiple sites will be a key factor in maintaining delivery momentum and achieving planned outcomes.","startDate":"2022-01-28","endDate":null,"scheduleNarrative":"Exempt under Section 22 - Information intended for future publication","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Exempt under Section 43 - Commercial interests","themes":["Delivery & schedule","Commercial & supply chain","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared with Q4 2024/25, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at Q4 2025/26 remains Amber. This reflects broadly stable progress against the delivery plan, alongside ongoing dependencies and approvals. Progress remains in line with plans, with the surveys required to inform site planning and delivery now commissioned. As the programme…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 22 - Information intended for future publication","narrativeClaimKind":null,"history":[{"id":"HO_0149_2223-Q2","year":2024,"name":"ASRA Accommodation Programme (Non Detained) (AAPND)","department":"HO","category":"Government Transformation and Service Delivery","description":"The ASRA Accommodation Programme (Non Detained) was initially set up as one of a range of responses within the Migration and Borders command in the Home Office to tackle a growing demand for asylum accommodation and to reduce reliance on costly contingency options such as hotels - which is a Prime Ministerial priority as highlighted in point 5 of the Ten Point Plan to tackle illegal migration. _x000D_ Following a Programme re-set, a change to the name and scope of programme has recently been approved; it will now be referred to as the ASRA Accommodation Programme (Non-detained). The programme aims to find and set up fit-for-purpose accommodation for non-detained Asylum Seekers (covering single adult males, single adult females and family cohorts) establishing a flexible accommodation landscape of both short-term and long-term facilities.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. The programme has undertaken a period of review and reset since the last assurance review in September 2023. There have been changes in the wider operating environment, including changes to the Home Office (HO) ministerial team. The programme has put in place strengthened leadership arrangements and the Review Team (RT) heard consistently that the programme environment feels more stable, with firmer foundations in place, a realistic ambition and more deliverable plans, and therefore has been rated as Amber.","startDate":"2022-01-28","endDate":"2027-03-31","scheduleNarrative":"The project's end-date at 23/24-Q4 is 2027-03-31. This is primarily due to the following factors. The programme has gone through a complete rescoping exercise-including changing name from LSAP to ASRA Accommodation Programme (ND). _x000D_ In addition we have new set of high level deliverables, setting new target dates until March 2027. The programme is currently on target and positively working through bottom up plans (with added contingencies).","fyBaseline":295.17,"fyForecast":208.18,"fyVariance":-29.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. Less than 5%","wholeLifeCost":4219.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 23/24-Q4 is 4219m. This is primarily due to the following factors. The whole life cost (WLC) of the Programme is currently estimated at 2.49bn over an appraisal period of 10 _x000D_ years. This is a decrease of 1.70bn compared to the WLC of 4.19bn estimated in the _x000D_ Programme Business Case published in September 2023, reflected by the reduction in bedspaces _x000D_ to be delivered (from 10,000 to 6,500) and revised timescales for delivery. The programme spend to the end of 2023/24 is 222.54m._x000D_ Further spend of 266.33m is forecast for 2024/25 to complete delivery of and operate the _x000D_ four existing sites, and to progress pipeline sites into delivery to meet the March 2025 target._x000D_ (This excludes contingency of 24.7m and OB of 31.3m.)._x000D_ Budget of 170.15m has already been allocated for the four sites in delivery.","benefits":0.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 0m.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Approvals & decisions"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. The programme has undertaken a period of review and reset since the last assurance review in September 2023. There have been changes in the wider operating environment, including changes to the Home Office (HO)…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 23/24-Q4 is 2027-03-31. This is primarily due to the following factors. The programme has gone through a complete rescoping exercise-including changing name from LSAP to ASRA Accommodation Programme (ND). _x000D_ In addition we have new set of high level deliverables, setting new target dates until March 2027. The programme is currently on target and positively working through bottom up plans (with added contingencies).","narrativeClaimKind":null},{"id":"HO_0149_2223-Q2","year":2025,"name":"ACCOMMODATION PROGRAMME (NON DETAINED) (APND)","department":"HO","category":"Government Transformation and Service Delivery","description":"The Asylum Accommodation Programme was initially set up as one of a range of responses in the Home Office to tackle a growing demand of asylum accommodation to reduce reliance on costly contingency options such as hotels. To date the Programme has delivered two sites (Wethersfield and the Bibby Stockholm) and continues to progress a pipeline of additional sites, outlined below. As lessons have been learned, the Programme has undertaken a strategic refresh and is aiming to deliver a more flexible estate, working closely with local authorities and statutory partners and in collaboration with other government departments. Smaller to medium sites are now being progressed and engagement is being prioritised at an earlier stage. As sites are progressed, a Stage Gate process is followed, ensuring that the correct steps and decision-making is carried out. The Programme is currently working towards a target of 5 thousand bed spaces by the end of 2026, agreed with InvestCo. This includes the delivery of pipeline sites and accommodation pilots.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The Programme has been rescaled from large sites to medium-sized sites with a focus on Pilot sites, which will contribute to the programme's 5 thousand target. The Programme remains committed to delivering against these targets and will be launching three pilot projects in close collaboration with local authorities and other key partners, testing different operating models for each of the sites through a more locally led delivery model. Due to these initiatives—and the Programmes continued efforts to reduce expenditure below last year’s levels, the programme maintains the Amber rating, which was confirmed during the recent NISTA review which also saw the programme awarded an Amber rating.","startDate":"2022-01-28","endDate":"2027-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2027. This is primarily due to the following factors‚ Pilots (there are 3 pilots in scope). Lower Target of 5000 bed spaces compared to 6500 bed spaces previous year (new target approved by Investco 16/01/25).","fyBaseline":322.33,"fyForecast":82.57,"fyVariance":74.38,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ 5% budget variance because the programmes expenditure was less than planned due to various reasons including slower than expected timelines to get sites live, planning approvals and site acquisitions.","wholeLifeCost":2492.43,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 4219 to 2492. This is primarily due to the following factors‚ 5% budget variance because the programme expenditure was less than planned due to various reasons including slower than expected timelines to get sites live, planning approvals and site acquisitions. Fewer sites than anticipated went live compared to previous business case due to slippage in timelines.","benefits":3187.7,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 0 to 3187. This is primarily due to the following factors‚ The Programme Business Case (PBC) was approved in 24/25 (for the first time) and the financial benefits modelling become available for reporting at this point. Prior to this and in the absence of approved financial modelling of benefits the Programme reported 0 which was advised at the time by the IPA (now NISTA) to the Delivery Lead for the Programme. The Programme was added to GMPP for the purpose of securing NISTA Assurance reviews funding and as such, the Programme had to commence GMPP reporting without an approved PBC or approved financial benefit modelling in place. The reported forecast of £3187.7m was for the whole life of the Programme up to and including 33/34 as outlined in the 2024 PBC.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The Programme has been rescaled from large sites to medium-sized sites with a focus on Pilot sites, which will contribute to the programme's 5 thousand target. The…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2027. This is primarily due to the following factors‚ Pilots (there are 3 pilots in scope). Lower Target of 5000 bed spaces compared to 6500 bed spaces previous year (new target approved by Investco 16/01/25).","narrativeClaimKind":null},{"id":"HO_0149_2223-Q2","year":2026,"name":"ASYLUM ACCOMMODATION PROGRAMME (AAP)","department":"HO","category":"Government Transformation and Service Delivery","description":"Asylum Accommodation Programme (AAP) increases the availability of safe and compliant asylum accommodation to meet statutory demand and reduce reliance on contingency hotel use. It will support a managed transition away from hotels, in line with the Government’s wider policy commitments.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared with Q4 2024/25, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at Q4 2025/26 remains Amber. This reflects broadly stable progress against the delivery plan, alongside ongoing dependencies and approvals. Progress remains in line with plans, with the surveys required to inform site planning and delivery now commissioned. As the programme progresses, timely approval across multiple sites will be a key factor in maintaining delivery momentum and achieving planned outcomes.","startDate":"2022-01-28","endDate":null,"scheduleNarrative":"Exempt under Section 22 - Information intended for future publication","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Exempt under Section 43 - Commercial interests","themes":["Delivery & schedule","Commercial & supply chain","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared with Q4 2024/25, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at Q4 2025/26 remains Amber. This reflects broadly stable progress against the delivery plan, alongside ongoing dependencies and approvals. Progress remains in line with plans, with the surveys required to inform site planning and delivery now commissioned. As the programme…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 22 - Information intended for future publication","narrativeClaimKind":null}],"previous":{"id":"HO_0149_2223-Q2","year":2025,"name":"ACCOMMODATION PROGRAMME (NON DETAINED) (APND)","department":"HO","category":"Government Transformation and Service Delivery","description":"The Asylum Accommodation Programme was initially set up as one of a range of responses in the Home Office to tackle a growing demand of asylum accommodation to reduce reliance on costly contingency options such as hotels. To date the Programme has delivered two sites (Wethersfield and the Bibby Stockholm) and continues to progress a pipeline of additional sites, outlined below. As lessons have been learned, the Programme has undertaken a strategic refresh and is aiming to deliver a more flexible estate, working closely with local authorities and statutory partners and in collaboration with other government departments. Smaller to medium sites are now being progressed and engagement is being prioritised at an earlier stage. As sites are progressed, a Stage Gate process is followed, ensuring that the correct steps and decision-making is carried out. The Programme is currently working towards a target of 5 thousand bed spaces by the end of 2026, agreed with InvestCo. This includes the delivery of pipeline sites and accommodation pilots.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The Programme has been rescaled from large sites to medium-sized sites with a focus on Pilot sites, which will contribute to the programme's 5 thousand target. The Programme remains committed to delivering against these targets and will be launching three pilot projects in close collaboration with local authorities and other key partners, testing different operating models for each of the sites through a more locally led delivery model. Due to these initiatives—and the Programmes continued efforts to reduce expenditure below last year’s levels, the programme maintains the Amber rating, which was confirmed during the recent NISTA review which also saw the programme awarded an Amber rating.","startDate":"2022-01-28","endDate":"2027-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2027. This is primarily due to the following factors‚ Pilots (there are 3 pilots in scope). Lower Target of 5000 bed spaces compared to 6500 bed spaces previous year (new target approved by Investco 16/01/25).","fyBaseline":322.33,"fyForecast":82.57,"fyVariance":74.38,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ 5% budget variance because the programmes expenditure was less than planned due to various reasons including slower than expected timelines to get sites live, planning approvals and site acquisitions.","wholeLifeCost":2492.43,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 4219 to 2492. This is primarily due to the following factors‚ 5% budget variance because the programme expenditure was less than planned due to various reasons including slower than expected timelines to get sites live, planning approvals and site acquisitions. Fewer sites than anticipated went live compared to previous business case due to slippage in timelines.","benefits":3187.7,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 0 to 3187. This is primarily due to the following factors‚ The Programme Business Case (PBC) was approved in 24/25 (for the first time) and the financial benefits modelling become available for reporting at this point. Prior to this and in the absence of approved financial modelling of benefits the Programme reported 0 which was advised at the time by the IPA (now NISTA) to the Delivery Lead for the Programme. The Programme was added to GMPP for the purpose of securing NISTA Assurance reviews funding and as such, the Programme had to commence GMPP reporting without an approved PBC or approved financial benefit modelling in place. The reported forecast of £3187.7m was for the whole life of the Programme up to and including 33/34 as outlined in the 2024 PBC.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The Programme has been rescaled from large sites to medium-sized sites with a focus on Pilot sites, which will contribute to the programme's 5 thousand target. The…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2027. This is primarily due to the following factors‚ Pilots (there are 3 pilots in scope). Lower Target of 5000 bed spaces compared to 6500 bed spaces previous year (new target approved by Investco 16/01/25).","narrativeClaimKind":null},"ratingDelta":1,"transition":"Worsened","endDateDeltaDays":null,"attentionScore":74,"attentionReasons":["Current published delivery confidence is Red","Published rating worsened from Amber to Red","In-year forecast variance is +43.0%"]},{"id":"MOD_0033_1112-Q1","year":2026,"name":"MARSHALL","department":"MOD","category":"Military Capability","description":"Marshall enables military terminal air traffic management services in the UK and abroad. This is achieved through a service provision contract with Aquila, a joint venture company of Thales and NATS, which also involves a significant update of obsolete equipment across the estate. Marshall combines some seventy previous equipment and support contracts into a single service delivery contract. It is delivered through fifteen technical services, supporting hub and satellite geographically clustered services. Marshall provides cost and workforce savings, significant equipment upgrades, and ensures compliance with the latest civil and military aviation regulatory requirements. Legacy technical services were transferred to Aquila in April 2015. The new services are principally delivered, maturing and typically performing above target.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 decreased to RED. This is primarily due to the following factors. 1. The Programme is seeking to resolve several commercial issues with the preferred option subject to Investment Approval Committee in the early part of FY26/27. Although new equipment delivery stands at over 92% and Notice of Service Availability, the key indicator toward Full Operating Capability (FOC), is over 50%, there are five equipment installation outliers that will not deliver by the currently approved 31 Oct 26 date.","startDate":"2006-04-03","endDate":"2026-10-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 31/10/2026. This is primarily due to the following factors. 1. Although the reported end date remains unchanged from Q4 24/25, the Programme will be seeking approval for a revised Full Operating Capability and Programme end date.","fyBaseline":124.74,"fyForecast":80.5,"fyVariance":35.46,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors: 1. In-Year underspend is the result of reprofiling into later years the outstanding equipment installations and Centre-directed saving measures (both deletions and deferrals).","wholeLifeCost":1997.56,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) increased from £1828M to £1870M. This is primarily due to the following factors. 1. This uplift reflects the increase in Programme scope to include additional safety critical and operationally essential change required by the Front Line Commands, and delays from previous FYs and added risk because of emerging changes. 2. However, the Programme continues to remain affordable and within its Approved Budgetary Level.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 decreased to RED. This is primarily due to the following factors. 1. The Programme is seeking to resolve several commercial issues with the preferred option subject to Investment Approval Committee in the early part of FY26/27. Although new equipment…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 31/10/2026. This is primarily due to the following factors. 1. Although the reported end date remains unchanged from Q4 24/25, the Programme will be seeking approval for a revised Full Operating Capability and Programme end date.","narrativeClaimKind":null,"history":[{"id":"MOD_0033_1112-Q1","year":2020,"name":"MARSHALL","department":"MOD","category":"Military Capability","description":"Delivering a sustainable Air Traffic Management capability.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber, which has declined since last year�s Q2 1819 Amber/Green, due primarily to the following factors; - Installation of new regulatory-compliant airfield Secondary Surveillance equipment (Wide Area Multilateration - WAM) highlighted performance issues with certain military aircraft types operating non-compliant transponder systems. This meant that the new systems could not be accepted into operational use alongside the legacy primary radar systems. - System users raised concerns regarding the ability to detect and track civilian aircraft with non-compliant secondary surveillance transponder systems (or no transponders at all) when Wide Area Multilateration (WAM) was used alongside legacy primary radar equipment. This meant that WAM could not be brought into operational use. Since the Q2 1920 (30th September 2019) Amber IPA DCA, the following primary project actions have impacted the original Q2 IPA DCA; - The programme schedule has been revised in order to prioritise the delivery of new primary surveillance systems. Performance of the new radars will address user concerns associated with Wide Area Multilateration detection of aircraft operating non-compliant secondary surveillance transponders (or no transponders at all). - Legacy secondary surveillance systems will remain in place until the new and more capable primary radars are delivered by the programme.","startDate":"2006-04-03","endDate":"2024-12-31","scheduleNarrative":"The scheduled baseline project end date at Q2 1920 (30th September 2019) is 31/12/24, has not changed since last year's Q2 1819 date of 31/12/24, due primarily to the following factors; - Equipment delivery across the scope of the programme has progressed well. - Service support to both legacy and newly-installed equipment has been good. Since the Q2 1920 (30th September 2019) baseline project end date of 31/12/24, the following primary project actions have impacted the original Q2 baseline project end date; - Replanning has been conducted to prioritise the delivery of primary surveillance radar equipment, but associated changes have not taken the projected end date beyond the existing Baseline End Date (aligned with Approvals). - Delivery of new air traffic management systems such as radios, navigation aids, etc., has continued at pace while replanning for the surveillance systems has been underway.","fyBaseline":127.26,"fyForecast":129.15,"fyVariance":1.0,"varianceNarrative":"Budget variance less than 5%","wholeLifeCost":1335.62,"costNarrative":"The baseline Whole Life Cost at Q2 1920 (30th September 2019) is �1,335.62 m, has decreased by �471.97 m since last year's Q2 1819 (�m) baseline Whole Life Cost of �1,807.59 m, due primarily to the following factors; - Programme MARSHALL remains affordable and is on track to deliver FOC well ahead of Approval (December 2024). The Whole Life Costs recorded in the report are not comparable; the 18/19 figures take into account the full life of the programme (to 2037) whilst the 19/20 figure presents a snapshot of only the first 10 years. - This accounts for the perceived discrepancy. The true forecast position is a variance of less than 1.5% growth over the 12 month reporting period.","benefits":null,"benefitsNarrative":"","themes":["Delivery & schedule","Cost & funding","Approvals & decisions","Scope & requirements"],"evidenceExcerpt":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber, which has declined since last year�s Q2 1819 Amber/Green, due primarily to the following factors; - Installation of new regulatory-compliant airfield Secondary Surveillance equipment (Wide Area Multilateration - WAM) highlighted performance issues with certain…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2020","sourceLabel":"IPA Annual Report 2019-20","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The scheduled baseline project end date at Q2 1920 (30th September 2019) is 31/12/24, has not changed since last year's Q2 1819 date of 31/12/24, due primarily to the following factors; - Equipment delivery across the scope of the programme has progressed well. - Service support to both legacy and newly-installed equipment has been good. Since the Q2 1920 (30th September 2019) baseline project end date of 31/12/24, the following primary project actions have impacted the original Q2 baseline project end date; - Replanning has been conducted to prioritise the delivery of primary surveillance radar equipment, but associated changes have not taken the projected end date beyond the existing Baseline End Date (aligned with Approvals). - Delivery of new air traffic management systems such as radios, navigation aids, etc., has continued at pace while replanning for the surveillance systems has been underway.","narrativeClaimKind":null},{"id":"MOD_0033_1112-Q1","year":2021,"name":"Marshall","department":"MOD","category":"Military Capability","description":"Marshall enables military terminal air traffic management services in the UK and abroad. Marshall combines some 70+ previous equipment and support contracts into a single service delivery contract. It is delivered through 15 technical services and replaces previous arrangements with a regionalised support model, supporting hub and satellite geographically-clustered services.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating decreased from Amber to Amber/Green. This is primarily due to the following factors: The Programme is still undergoing significant 'first of class' activity, including the implementation of the first Hub and Satellite to deliver Air Traffic Control Services regionally. The Lincolnshire Hub is scheduled to be established in October 21, with software development and network security challenges ongoing. However, the Marshall 'all-up capability package' has been delivered at RAF Shawbury and entered Full Operational Service in January 2021. The experience at Shawbury has provided an opportunity for considerable learning from experience, which will smooth future equipment delivery and transition activity.","startDate":"2006-04-03","endDate":"2024-12-31","scheduleNarrative":"Compared to financial year 19/20-Q2, the project's end-date remained scheduled to finish on 31 December 2024 . This is primarily due to the following factors:","fyBaseline":144.25,"fyForecast":147.4,"fyVariance":2.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":1504.42,"costNarrative":"Compared to financial year 19/20-Q2, the projects Baseline Whole Life Cost increased from �1335.62m to �1504.42m. This is primarily due to the following factors: The reported Baseline Whole Life Costs run until Financial Year 29/30 and do not take into account the full life of the programme, which ends in 2037. Therefore, the Baseline Whole Life Costs will increase year-on-year until 2027 at which point all remaining years will be contained within the Annual Budgetary Cycle period. The programme currently remains affordable and within Approved Budgetary Limit. A Review Note has been submitted that is seeking an uplift in Approved Budgetary Limit to facilitate future changes to be funded by the Front-Line Commands.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating decreased from Amber to Amber/Green. This is primarily due to the following factors: The Programme is still undergoing significant 'first of class' activity, including the implementation of the first Hub and Satellite to deliver Air Traffic…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 19/20-Q2, the project's end-date remained scheduled to finish on 31 December 2024 . This is primarily due to the following factors:","narrativeClaimKind":null},{"id":"MOD_0033_1112-Q1","year":2022,"name":"MARSHALL","department":"MOD","category":"Military Capability","description":"Marshall enables military terminal air traffic management services in the UK and abroad.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 20/21-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating decreased from Amber/Green to Amber. This is primarily due to the following factors: The removal of the incremental Amber/Green and Amber/Red assessment ratings. There has been successful Site-Specific Assurance and Commissioning Board at RAF Shawbury in Nov 20. The Shawbury 'all-up capability package' comprising the STAR-NG Primary Surveillance Radar, the Wide Area Multilateration system and the TopSky tower interface system and displays, achieved Full Operational Service on 18 January 21 (Programme Initial Operating Capability). This model is now being replicated across Defence.","startDate":"2006-04-03","endDate":"2024-12-31","scheduleNarrative":"Compared to 2021-Q4, the project end-date remained scheduled to finish on 31 December 2024.","fyBaseline":145.4,"fyForecast":134.51,"fyVariance":-8.0,"varianceNarrative":"The budget variance exceeds 5%. This is principally due to re-scheduling as part of the Primary Radar Surveillance optimisation approach which has seen some re-profiling of milestones. In addition, technical integration difficulties exacerbated by Covid 19 have caused a 9-month delay to the deployable Air Traffic Control equipment milestones. However, the equipment will still be delivered within programme Full Operating Capability.","wholeLifeCost":1564.0,"costNarrative":"Compared to 2021-Q4, the projects Baseline Whole Life Cost has increased by £60M (£1504.42M at Q4 20/21 and £1564.303M at Q4 21/22). This is primarily due to the following factors: The inclusion of a budget for FY 31/32. The programme remains affordable and is within the increased Approved Budgetary Level of £1968.8M approved in November 21. This uplift reflects the increase in programme scope to include safety critical and operationally essential change required by Front Line Commands.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Workforce & capability","Delivery & schedule","Technical & integration"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating decreased from Amber/Green to Amber. This is primarily due to the following factors: The removal of the incremental Amber/Green and Amber/Red assessment ratings. There has been successful Site-Specific Assurance and Commissioning Board at RAF Shawbury…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to 2021-Q4, the project end-date remained scheduled to finish on 31 December 2024.","narrativeClaimKind":null},{"id":"MOD_0033_1112-Q1","year":2023,"name":"MARSHALL","department":"MOD","category":"Military Capability","description":"Marshall enables military terminal air traffic management services in the UK and abroad.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 21/22-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. Hub and Satellite operations commenced at the Lincolnshire Terminal Air Traffic Control Centre in April 2022, which enabled Waddington radar services to be delivered from Coningsby. Hub and Satellite operations from Terminal Air Traffic Control Centre (East) at Marham will start in April 2023 with the relocation of Wittering radar services, and the first Hub and Satellite operations from Terminal Air Traffic Control Centre (South) at Brize Norton are due to start in June 2023 with the transfer of Benson radar services. Work continues to address the known risks and issues with the Programme, including identifying mitigations to a potential delay to achieving the Full Operating Capability milestone.","startDate":"2006-04-03","endDate":"2024-12-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2024-12-31. This is primarily due to the following factors. NA","fyBaseline":116.49,"fyForecast":84.75,"fyVariance":-27.0,"varianceNarrative":"The budget variance exceeds 5% This is primarily due to the following factors: Delays in new equipment roll-out against the schedule and re-alignment by Defence Equipment and Support of previously mis-aligned accruals. The In-Year Marshall underspend has been absorbed by Programme of Work bring-forward spend elsewhere across the wider Air Capability portfolio, with the commensurate Marshall costs re-profiled into Years 1 and 2.","wholeLifeCost":1573.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 increased from 1564m. to 1573m. This is primarily due to the following factors. Reflects the inclusion of Private Sector Support costs over the Annual Budget Cycle period. The programme remains affordable, with cost increase contained within the Approved Budgetary Limit.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This programme does not report cashable benefits. Its aim is to provision the armed forces with the equipment and / or infrastructure required.","themes":["Cost & funding","Delivery & schedule","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. Hub and Satellite operations commenced at the Lincolnshire Terminal Air Traffic Control Centre in April 2022, which enabled Waddington radar services to be delivered from…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2024-12-31. This is primarily due to the following factors. NA","narrativeClaimKind":null},{"id":"MOD_0033_1112-Q1","year":2024,"name":"MARSHALL","department":"MOD","category":"Military Capability","description":"Marshall enables military terminal air traffic management services in the UK and abroad. This is achieved through a service provision contract, which also involves a significant update of obsolete equipment across the estate. Marshall combines some seventy previous equipment and support contracts into a single service delivery contract. It is delivered through fifteen technical services; supporting hub and satellite geographically clustered services. Marshall provides cost and workforce savings, significant equipment upgrades, and ensures compliance with the latest civil and military aviation regulatory requirements. Legacy technical services were transferred in April 2015. The new services are principally delivered, maturing and typically performing above target.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The Programme Delivery Confidence Assessment remains Amber although with an improving trend. Work continues to address the known risks and issues which appear resolvable at this stage. Elsewhere, Hub and Satellite operations from the Terminal Air Traffic Control Centre (TATCC) (East) at Marham began in Apr 23 with the transfer of Wittering radar services. The first Hub and Satellite operations from TATCC (South) commenced in Jun 23 when Benson radar services relocated to Brize Norton.","startDate":"2006-04-03","endDate":"2026-10-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 increased from 2024-12-31 to 2026-10-31. This is primarily due to the following factors. Adjustments in the delivery of new equipment to some Programme outliers has necessitated a slip in the Programme’s Full Operating Capability (FOC) and Programme Closure milestones. These changes will not result in any cost increase nor operational impact. Potential mitigating options are being explored to bring forward equipment delivery against the revised FOC date.","fyBaseline":100.06,"fyForecast":92.16,"fyVariance":-7.895,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. Contractor resourcing issues, meaning that some new equipment roll-out milestones have slipped beyond this FY but with no impact to the achievement of FOC by October 26 at this time.","wholeLifeCost":1774.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 increased from 1573m to 1774m. This uplift reflects the increase in programme scope to include safety critical and operationally essential change required by the Front Line Commands. The programme remains affordable.","benefits":0.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 0m.","themes":["Cost & funding","Delivery & schedule","Workforce & capability","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The Programme Delivery Confidence Assessment remains Amber although with an improving trend. Work continues to address the known risks and issues which appear resolvable at…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 increased from 2024-12-31 to 2026-10-31. This is primarily due to the following factors. Adjustments in the delivery of new equipment to some Programme outliers has necessitated a slip in the Programme’s Full Operating Capability (FOC) and Programme Closure milestones. These changes will not result in any cost increase nor operational impact. Potential mitigating options are being explored to bring forward equipment delivery against the revised FOC date.","narrativeClaimKind":null},{"id":"MOD_0033_1112-Q1","year":2025,"name":"MARSHALL","department":"MoD","category":"Military Capability","description":"Marshall enables military terminal air traffic management services in the UK and abroad. This is achieved through a service provision contract with Aquila, a joint venture company of Thales and NATS, which also involves a significant update of obsolete equipment across the estate. Marshall combines some seventy previous equipment and support contracts into a single service delivery contract. It is delivered through fifteen technical services, supporting hub and satellite geographically clustered services. Marshall provides cost and workforce savings, significant equipment upgrades, and ensures compliance with the latest civil and military aviation regulatory requirements. Legacy technical services were transferred to Aquila in April 2015. The new services are principally delivered, maturing and typically performing above target.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. Work continues to address the known risks and issues with resolution being sought in conjunction with the Delivery Team and the Contractor. Accessing sufficiently qualified and experienced people to deliver critical network migration issues such as the BT Withdrawal of Analogue and Kilostream services and Synchronised Digital Hierarchy are a concern, as well as funding decisions imposed on the Programme following MOD Centre arbitration. St Kilda, the Falklands, and Gibraltar are impacted by the above impending issue also.","startDate":"2006-04-03","endDate":"2026-10-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/10/2026. This is primarily due to the following factors. No change in project end-date.","fyBaseline":104.71,"fyForecast":89.63,"fyVariance":14.4,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. An In-Year reduction caused by fade and re-profiling into Year 1 of ABC25. There is little to indicate that this will affect the Full Operating Capability delivery milestone.","wholeLifeCost":1828.06,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 1774 to 1828. This is primarily due to the following factors. This uplift reflects the increase in programme scope to include additional safety critical and operationally essential change required by the Front Line Commands. The Programme remains affordable and within the Approved Budgetary Level.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Delivery & schedule","Technical & integration","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. Work continues to address the known risks and issues with resolution being sought in conjunction with the Delivery Team and the Contractor. Accessing sufficiently qualified and experienced people to…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/10/2026. This is primarily due to the following factors. No change in project end-date.","narrativeClaimKind":null},{"id":"MOD_0033_1112-Q1","year":2026,"name":"MARSHALL","department":"MOD","category":"Military Capability","description":"Marshall enables military terminal air traffic management services in the UK and abroad. This is achieved through a service provision contract with Aquila, a joint venture company of Thales and NATS, which also involves a significant update of obsolete equipment across the estate. Marshall combines some seventy previous equipment and support contracts into a single service delivery contract. It is delivered through fifteen technical services, supporting hub and satellite geographically clustered services. Marshall provides cost and workforce savings, significant equipment upgrades, and ensures compliance with the latest civil and military aviation regulatory requirements. Legacy technical services were transferred to Aquila in April 2015. The new services are principally delivered, maturing and typically performing above target.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 decreased to RED. This is primarily due to the following factors. 1. The Programme is seeking to resolve several commercial issues with the preferred option subject to Investment Approval Committee in the early part of FY26/27. Although new equipment delivery stands at over 92% and Notice of Service Availability, the key indicator toward Full Operating Capability (FOC), is over 50%, there are five equipment installation outliers that will not deliver by the currently approved 31 Oct 26 date.","startDate":"2006-04-03","endDate":"2026-10-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 31/10/2026. This is primarily due to the following factors. 1. Although the reported end date remains unchanged from Q4 24/25, the Programme will be seeking approval for a revised Full Operating Capability and Programme end date.","fyBaseline":124.74,"fyForecast":80.5,"fyVariance":35.46,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors: 1. In-Year underspend is the result of reprofiling into later years the outstanding equipment installations and Centre-directed saving measures (both deletions and deferrals).","wholeLifeCost":1997.56,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) increased from £1828M to £1870M. This is primarily due to the following factors. 1. This uplift reflects the increase in Programme scope to include additional safety critical and operationally essential change required by the Front Line Commands, and delays from previous FYs and added risk because of emerging changes. 2. However, the Programme continues to remain affordable and within its Approved Budgetary Level.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 decreased to RED. This is primarily due to the following factors. 1. The Programme is seeking to resolve several commercial issues with the preferred option subject to Investment Approval Committee in the early part of FY26/27. Although new equipment…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 31/10/2026. This is primarily due to the following factors. 1. Although the reported end date remains unchanged from Q4 24/25, the Programme will be seeking approval for a revised Full Operating Capability and Programme end date.","narrativeClaimKind":null}],"previous":{"id":"MOD_0033_1112-Q1","year":2025,"name":"MARSHALL","department":"MoD","category":"Military Capability","description":"Marshall enables military terminal air traffic management services in the UK and abroad. This is achieved through a service provision contract with Aquila, a joint venture company of Thales and NATS, which also involves a significant update of obsolete equipment across the estate. Marshall combines some seventy previous equipment and support contracts into a single service delivery contract. It is delivered through fifteen technical services, supporting hub and satellite geographically clustered services. Marshall provides cost and workforce savings, significant equipment upgrades, and ensures compliance with the latest civil and military aviation regulatory requirements. Legacy technical services were transferred to Aquila in April 2015. The new services are principally delivered, maturing and typically performing above target.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. Work continues to address the known risks and issues with resolution being sought in conjunction with the Delivery Team and the Contractor. Accessing sufficiently qualified and experienced people to deliver critical network migration issues such as the BT Withdrawal of Analogue and Kilostream services and Synchronised Digital Hierarchy are a concern, as well as funding decisions imposed on the Programme following MOD Centre arbitration. St Kilda, the Falklands, and Gibraltar are impacted by the above impending issue also.","startDate":"2006-04-03","endDate":"2026-10-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/10/2026. This is primarily due to the following factors. No change in project end-date.","fyBaseline":104.71,"fyForecast":89.63,"fyVariance":14.4,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. An In-Year reduction caused by fade and re-profiling into Year 1 of ABC25. There is little to indicate that this will affect the Full Operating Capability delivery milestone.","wholeLifeCost":1828.06,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 1774 to 1828. This is primarily due to the following factors. This uplift reflects the increase in programme scope to include additional safety critical and operationally essential change required by the Front Line Commands. The Programme remains affordable and within the Approved Budgetary Level.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Delivery & schedule","Technical & integration","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. Work continues to address the known risks and issues with resolution being sought in conjunction with the Delivery Team and the Contractor. Accessing sufficiently qualified and experienced people to…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/10/2026. This is primarily due to the following factors. No change in project end-date.","narrativeClaimKind":null},"ratingDelta":1,"transition":"Worsened","endDateDeltaDays":0,"attentionScore":72,"attentionReasons":["Current published delivery confidence is Red","Published rating worsened from Amber to Red","In-year forecast variance is +35.5%"]},{"id":"MOJ_0111_2122-Q2","year":2026,"name":"10K Additional Prison Places Estate Expansion Category D","department":"MOJ","category":"Infrastructure and Construction","description":"The Category D Programme supports our 20,000 additional prison places commitment; it will provide additional permanent places across the Category D open prison estate","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25-Q4, the NISTA Delivery Confidence Assessment rating at 25/26-Q4 remains at Red. This is primarily due to issues arising from the administration of a key supplier.","startDate":"2020-01-24","endDate":"2031-03-20","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end date at 25/26-Q4 changed from 20/09/29 to 20/03/31.​ This is primarily due to the programme’s key supplier entering administration and the resulting delays on delivery.","fyBaseline":11.85,"fyForecast":19.67,"fyVariance":65.99,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to supplier administration and the resulting effect on programme costs.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"This programme currently reports no monetised benefits. Due to the projected increasing prisons population, this programme focusses on increasing capacity and there are no monetised benefits to be claimed. The programme's other benefits are defined in the current baseline as: construction benefits and outcomes (capacity, modern methods of construction and sustainability); to enable an improvement in prisoner rehabilitation outcomes; and, during its construction, deliver local community benefits.","themes":["Commercial & supply chain","Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 24/25-Q4, the NISTA Delivery Confidence Assessment rating at 25/26-Q4 remains at Red. This is primarily due to issues arising from the administration of a key supplier. Compared to financial year 24/25-Q4, the project's end date at 25/26-Q4 changed from 20/09/29 to 20/03/31.​ This is primarily due to the programme’s key supplier…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end date at 25/26-Q4 changed from 20/09/29 to 20/03/31.​ This is primarily due to the programme’s key supplier entering administration and the resulting delays on delivery.","narrativeClaimKind":null,"history":[{"id":"MOJ_0111_2122-Q2","year":2023,"name":"10K Additional Prison Places Estate Expansion Category D","department":"MOJ","category":"Infrastructure and Construction","description":"The Programme's scope is to deliver 1,320 places across the Category D estate.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 is Amber. This is primarily due to the following factors. This is the first time data has been published for this programme, which has been added to GMPP over the last year.This programme was formerly reporting as part of the 10k Additional Prison Places Estates Expansion Programme.The Amber assessment is driven by inflation risks.","startDate":"2020-01-24","endDate":null,"scheduleNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","fyBaseline":136.68,"fyForecast":27.76,"fyVariance":-80.0,"varianceNarrative":"Costs for the two phases have been re-profiled into future financial years, due to rescoping elements of the programme.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This project currently reports no monetised benefits. Due to the projected increasing prisons population, this project focusses on increasing capacity and there are no monetised benefits to be claimed. The programme's other benefits are defined in the current baseline as: construction benefits and outcomes (capacity, modern methods of construction and sustainability); to enable an improvement in prisoner rehabilitation outcomes; and, during its construction, deliver local community benefits.","themes":["Commercial & supply chain","Cost & funding","Delivery & schedule","Technical & integration"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 is Amber. This is primarily due to the following factors. This is the first time data has been published for this programme, which has been added to GMPP over the last year.This programme was formerly reporting as part of the 10k Additional Prison Places Estates…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","narrativeClaimKind":null},{"id":"MOJ_0111_2122-Q2","year":2024,"name":"10K Additional Prison Places Estate Expansion Category D","department":"MOJ","category":"Infrastructure and Construction","description":"The Category D Programme supports our 20,000 additional prison places commitment; its scope is to deliver 1,320 permanent places across the Category D open prison estate.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. Risks to timelines and inflation risks contributing to the increasing cost estimate, which is greater than that estimated previously.","startDate":"2020-01-24","endDate":null,"scheduleNarrative":"Exempt under Section 22 of the Freedom of Information Act 2000 (Information intended for future publication)","fyBaseline":88.63,"fyForecast":47.15,"fyVariance":-47.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The underspend is due to costs for the two phases having been re-profiled into future financial years, following delays stemming from planning issues and challenging site conditions, and the rescoping of certain elements of the programme.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":0.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 0m. This project currently reports no monetised benefits. Due to the projected increasing prisons population, this project focusses on increasing capacity and there are no monetised benefits to be claimed. The programme's other benefits are defined in the current baseline as: construction benefits and outcomes (capacity, modern methods of construction and sustainability); to enable an improvement in prisoner rehabilitation outcomes; and, during its construction, deliver local community benefits.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. Risks to timelines and inflation risks contributing to the increasing cost estimate, which is greater than that estimated previously. Exempt under Section 22 of the…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 22 of the Freedom of Information Act 2000 (Information intended for future publication)","narrativeClaimKind":null},{"id":"MOJ_0111_2122-Q2","year":2025,"name":"10K Additional Prison Places Estate Expansion Category D","department":"MoJ","category":"Infrastructure and Construction","description":"The Category D Programme supports our 20,000 additional prison places commitment; it will provide additional permanent places across the Category D open prison estate.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 decreased from AMBER to RED. This is primarily due to the following factors‚ The programme’s key supplier entered administration.","startDate":"2020-01-24","endDate":"2029-09-20","scheduleNarrative":"The project's end-date at 24/25-Q4 is scheduled to be 20/09/2029. This is primarily due to the following factors‚ The programme’s key supplier entered administration.","fyBaseline":152.22,"fyForecast":27.26,"fyVariance":82.09,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ This is due to delays stemming from supplier administration and the rescoping of some elements of the programme, requiring some costs to be re-profiled into future financial years.","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ This project currently reports no monetised benefits. Due to the projected increasing prisons population, this project focusses on increasing capacity and there are no monetised benefits to be claimed. The programme's other benefits are defined in the current baseline as: construction benefits and outcomes (capacity, modern methods of construction and sustainability); to enable an improvement in prisoner rehabilitation outcomes; and, during its construction, deliver local community benefits.","themes":["Commercial & supply chain","Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 decreased from AMBER to RED. This is primarily due to the following factors‚ The programme’s key supplier entered administration. The project's end-date at 24/25-Q4 is scheduled to be 20/09/2029. This is primarily due to the…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 24/25-Q4 is scheduled to be 20/09/2029. This is primarily due to the following factors‚ The programme’s key supplier entered administration.","narrativeClaimKind":null},{"id":"MOJ_0111_2122-Q2","year":2026,"name":"10K Additional Prison Places Estate Expansion Category D","department":"MOJ","category":"Infrastructure and Construction","description":"The Category D Programme supports our 20,000 additional prison places commitment; it will provide additional permanent places across the Category D open prison estate","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25-Q4, the NISTA Delivery Confidence Assessment rating at 25/26-Q4 remains at Red. This is primarily due to issues arising from the administration of a key supplier.","startDate":"2020-01-24","endDate":"2031-03-20","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end date at 25/26-Q4 changed from 20/09/29 to 20/03/31.​ This is primarily due to the programme’s key supplier entering administration and the resulting delays on delivery.","fyBaseline":11.85,"fyForecast":19.67,"fyVariance":65.99,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to supplier administration and the resulting effect on programme costs.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"This programme currently reports no monetised benefits. Due to the projected increasing prisons population, this programme focusses on increasing capacity and there are no monetised benefits to be claimed. The programme's other benefits are defined in the current baseline as: construction benefits and outcomes (capacity, modern methods of construction and sustainability); to enable an improvement in prisoner rehabilitation outcomes; and, during its construction, deliver local community benefits.","themes":["Commercial & supply chain","Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 24/25-Q4, the NISTA Delivery Confidence Assessment rating at 25/26-Q4 remains at Red. This is primarily due to issues arising from the administration of a key supplier. Compared to financial year 24/25-Q4, the project's end date at 25/26-Q4 changed from 20/09/29 to 20/03/31.​ This is primarily due to the programme’s key supplier…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end date at 25/26-Q4 changed from 20/09/29 to 20/03/31.​ This is primarily due to the programme’s key supplier entering administration and the resulting delays on delivery.","narrativeClaimKind":null}],"previous":{"id":"MOJ_0111_2122-Q2","year":2025,"name":"10K Additional Prison Places Estate Expansion Category D","department":"MoJ","category":"Infrastructure and Construction","description":"The Category D Programme supports our 20,000 additional prison places commitment; it will provide additional permanent places across the Category D open prison estate.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 decreased from AMBER to RED. This is primarily due to the following factors‚ The programme’s key supplier entered administration.","startDate":"2020-01-24","endDate":"2029-09-20","scheduleNarrative":"The project's end-date at 24/25-Q4 is scheduled to be 20/09/2029. This is primarily due to the following factors‚ The programme’s key supplier entered administration.","fyBaseline":152.22,"fyForecast":27.26,"fyVariance":82.09,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ This is due to delays stemming from supplier administration and the rescoping of some elements of the programme, requiring some costs to be re-profiled into future financial years.","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ This project currently reports no monetised benefits. Due to the projected increasing prisons population, this project focusses on increasing capacity and there are no monetised benefits to be claimed. The programme's other benefits are defined in the current baseline as: construction benefits and outcomes (capacity, modern methods of construction and sustainability); to enable an improvement in prisoner rehabilitation outcomes; and, during its construction, deliver local community benefits.","themes":["Commercial & supply chain","Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 decreased from AMBER to RED. This is primarily due to the following factors‚ The programme’s key supplier entered administration. The project's end-date at 24/25-Q4 is scheduled to be 20/09/2029. This is primarily due to the…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 24/25-Q4 is scheduled to be 20/09/2029. This is primarily due to the following factors‚ The programme’s key supplier entered administration.","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":546,"attentionScore":70,"attentionReasons":["Current published delivery confidence is Red","Published end date moved 546 days later","In-year forecast variance is +66.0%"]},{"id":"MOJ_0113_2122-Q2","year":2026,"name":"10K Additional Prison Places Estate Expansion Houseblocks and Refurbishments","department":"MOJ","category":"Infrastructure and Construction","description":"The Houseblocks and Refurbishments Programme supports our 20,000 additional prison places commitment; its scope is to deliver around 2000 additional prison places, primarily in the closed male category B and C estate. This includes modern, purpose-built houseblocks which will provide improved living space for prisoners and a safer working environment for staff.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25-Q4, the NISTA Delivery Confidence Assessment (DCA) rating at 25/26-Q4 remains at Red. This is primarily due to the administration of a key supplier.","startDate":"2019-08-15","endDate":"2031-02-05","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 changed from 05/08/29 to 05/02/31. This is primarily due to delays emerging from a key delivery supplier entering into administration.","fyBaseline":58.47,"fyForecast":25.2,"fyVariance":56.9,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to supplier administration and the resulting effect on programme costs.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"This programme currently reports no monetised benefits. This programme focusses on increasing capacity and there are no monetised benefits to be claimed. The programme's other benefits are defined in the current baseline as: construction benefits and outcomes (capacity, modern methods of construction and sustainability); to enable an improvement in prisoner rehabilitation outcomes; and, during its construction, deliver local community benefits.​","themes":["Commercial & supply chain","Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 24/25-Q4, the NISTA Delivery Confidence Assessment (DCA) rating at 25/26-Q4 remains at Red. This is primarily due to the administration of a key supplier. Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 changed from 05/08/29 to 05/02/31. This is primarily due to delays emerging from a key delivery supplier…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 changed from 05/08/29 to 05/02/31. This is primarily due to delays emerging from a key delivery supplier entering into administration.","narrativeClaimKind":null,"history":[{"id":"MOJ_0113_2122-Q2","year":2023,"name":"10k additional prison places Estate Expansion Houseblocks and Refurbishments","department":"MOJ","category":"Infrastructure and Construction","description":"This programme will deliver around 1,785 additional prison places in the closed male category B and C estate. This includes modern, purpose-built houseblocks which will provide improved living space for prisoners and a safer working environment for staff.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 is Amber. This is primarily due to the following factors. This is thefirst timedata has been published for this project, which has been added to GMPP over the last year.This programme was formerly reporting as part of the 10k Additional Prison Places Estates Expansion Programme.The Amber assessment is driven by inflation risk and recruitment challenges. The programme has successfully delivered one site.","startDate":"2019-08-15","endDate":null,"scheduleNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","fyBaseline":194.21,"fyForecast":65.38,"fyVariance":-66.0,"varianceNarrative":"The underspend is due to the descoping of the Rye Hill project from the programme and delays to elements of the programme that have necessitatedcosts to be re-profiled into future financial years.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This project currently reports no monetised benefits. Due to the projected increasing prisons population, this project focusses on increasing capacity and there are no monetised benefits to be claimed. The programme's other benefits are defined in the current baseline as: construction benefits and outcomes (capacity, modern methods of construction and sustainability); to enable an improvement in prisoner rehabilitation outcomes; and, during its construction, deliver local community benefits.","themes":["Commercial & supply chain","Cost & funding","Delivery & schedule"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 is Amber. This is primarily due to the following factors. This is thefirst timedata has been published for this project, which has been added to GMPP over the last year.This programme was formerly reporting as part of the 10k Additional Prison Places Estates Expansion…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","narrativeClaimKind":null},{"id":"MOJ_0113_2122-Q2","year":2024,"name":"10k additional prison places Estate Expansion Houseblocks and Refurbishments","department":"MOJ","category":"Infrastructure and Construction","description":"The Houseblocks and Refurbishments Programme supports our 20,000 additional prison places commitment; its scope is to deliver around 2000 additional prison places, primarily in the closed male category B and C estate. This includes modern, purpose-built houseblocks which will provide improved living space for prisoners and a safer working environment for staff.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. Ongoing construction issues.","startDate":"2019-08-15","endDate":null,"scheduleNarrative":"Exempt under Section 22 of the Freedom of Information Act 2000 (Information intended for future publication)","fyBaseline":139.13,"fyForecast":98.99,"fyVariance":-29.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The underspend is due to delays stemming from challenging site conditions, requiring some costs to be re-profiled into future financial years.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":0.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 0m. This project currently reports no monetised benefits. Due to the projected increasing prisons population, this project focusses on increasing capacity and there are no monetised benefits to be claimed. The programme's other benefits are defined in the current baseline as: construction benefits and outcomes (capacity, modern methods of construction and sustainability); to enable an improvement in prisoner rehabilitation outcomes; and, during its construction, deliver local community benefits.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. Ongoing construction issues. Exempt under Section 22 of the Freedom of Information Act 2000 (Information intended for future publication)","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 22 of the Freedom of Information Act 2000 (Information intended for future publication)","narrativeClaimKind":null},{"id":"MOJ_0113_2122-Q2","year":2025,"name":"10K Additional Prison Places Estate Expansion Houseblocks and Refurbishments","department":"MoJ","category":"Infrastructure and Construction","description":"The Houseblocks and Refurbishments Programme supports our 20,000 additional prison places commitment; its scope is to deliver around 2000 additional prison places, primarily in the closed male category B and C estate. This includes modern, purpose-built houseblocks which will provide improved living space for prisoners and a safer working environment for staff.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 decreased from AMBER to RED. This is primarily due to the following factors‚ The programme’s key supplier entered administration.","startDate":"2019-08-15","endDate":"2029-08-05","scheduleNarrative":"The project's end-date at 24/25-Q4 is scheduled to be 05/08/2029. This is primarily due to the following factors‚ The programme’s key supplier entered administration.","fyBaseline":78.1,"fyForecast":71.9,"fyVariance":7.94,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ This is due to delays stemming from supplier administration, requiring some costs to be re-profiled into future financial years.","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ This project currently reports no monetised benefits. Due to the projected increasing prisons population, this project focusses on increasing capacity and there are no monetised benefits to be claimed. The programme's other benefits are defined in the current baseline as: construction benefits and outcomes (capacity, modern methods of construction and sustainability); to enable an improvement in prisoner rehabilitation outcomes; and, during its construction, deliver local community benefits.","themes":["Commercial & supply chain","Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 decreased from AMBER to RED. This is primarily due to the following factors‚ The programme’s key supplier entered administration. The project's end-date at 24/25-Q4 is scheduled to be 05/08/2029. This is primarily due to the…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 24/25-Q4 is scheduled to be 05/08/2029. This is primarily due to the following factors‚ The programme’s key supplier entered administration.","narrativeClaimKind":null},{"id":"MOJ_0113_2122-Q2","year":2026,"name":"10K Additional Prison Places Estate Expansion Houseblocks and Refurbishments","department":"MOJ","category":"Infrastructure and Construction","description":"The Houseblocks and Refurbishments Programme supports our 20,000 additional prison places commitment; its scope is to deliver around 2000 additional prison places, primarily in the closed male category B and C estate. This includes modern, purpose-built houseblocks which will provide improved living space for prisoners and a safer working environment for staff.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25-Q4, the NISTA Delivery Confidence Assessment (DCA) rating at 25/26-Q4 remains at Red. This is primarily due to the administration of a key supplier.","startDate":"2019-08-15","endDate":"2031-02-05","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 changed from 05/08/29 to 05/02/31. This is primarily due to delays emerging from a key delivery supplier entering into administration.","fyBaseline":58.47,"fyForecast":25.2,"fyVariance":56.9,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to supplier administration and the resulting effect on programme costs.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"This programme currently reports no monetised benefits. This programme focusses on increasing capacity and there are no monetised benefits to be claimed. The programme's other benefits are defined in the current baseline as: construction benefits and outcomes (capacity, modern methods of construction and sustainability); to enable an improvement in prisoner rehabilitation outcomes; and, during its construction, deliver local community benefits.​","themes":["Commercial & supply chain","Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 24/25-Q4, the NISTA Delivery Confidence Assessment (DCA) rating at 25/26-Q4 remains at Red. This is primarily due to the administration of a key supplier. Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 changed from 05/08/29 to 05/02/31. This is primarily due to delays emerging from a key delivery supplier…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 changed from 05/08/29 to 05/02/31. This is primarily due to delays emerging from a key delivery supplier entering into administration.","narrativeClaimKind":null}],"previous":{"id":"MOJ_0113_2122-Q2","year":2025,"name":"10K Additional Prison Places Estate Expansion Houseblocks and Refurbishments","department":"MoJ","category":"Infrastructure and Construction","description":"The Houseblocks and Refurbishments Programme supports our 20,000 additional prison places commitment; its scope is to deliver around 2000 additional prison places, primarily in the closed male category B and C estate. This includes modern, purpose-built houseblocks which will provide improved living space for prisoners and a safer working environment for staff.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 decreased from AMBER to RED. This is primarily due to the following factors‚ The programme’s key supplier entered administration.","startDate":"2019-08-15","endDate":"2029-08-05","scheduleNarrative":"The project's end-date at 24/25-Q4 is scheduled to be 05/08/2029. This is primarily due to the following factors‚ The programme’s key supplier entered administration.","fyBaseline":78.1,"fyForecast":71.9,"fyVariance":7.94,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ This is due to delays stemming from supplier administration, requiring some costs to be re-profiled into future financial years.","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ This project currently reports no monetised benefits. Due to the projected increasing prisons population, this project focusses on increasing capacity and there are no monetised benefits to be claimed. The programme's other benefits are defined in the current baseline as: construction benefits and outcomes (capacity, modern methods of construction and sustainability); to enable an improvement in prisoner rehabilitation outcomes; and, during its construction, deliver local community benefits.","themes":["Commercial & supply chain","Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 decreased from AMBER to RED. This is primarily due to the following factors‚ The programme’s key supplier entered administration. The project's end-date at 24/25-Q4 is scheduled to be 05/08/2029. This is primarily due to the…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 24/25-Q4 is scheduled to be 05/08/2029. This is primarily due to the following factors‚ The programme’s key supplier entered administration.","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":549,"attentionScore":70,"attentionReasons":["Current published delivery confidence is Red","Published end date moved 549 days later","In-year forecast variance is +56.9%"]},{"id":"MOD_0091_1415-Q3","year":2026,"name":"ARMOURED CAVALRY 2025","department":"MOD","category":"Military Capability","description":"The Armoured Cavalry Programme is central to the Army’s Integrated Review and Future Soldier. It will deliver a multi-role Ground Mounted Crewed Reconnaissance capability, centred on the Ajax family of vehicles and their training and support systems, into service with the British Army. The six Ajax variants deliver a step change in capability compared to current in-service vehicles in the areas of Intelligence, Surveillance, Target Acquisition & Reconnaissance (ISTAR) sensors, multi-domain integration, lethality, protection, and mobility. 589 vehicles will be delivered through a firm-price contract with General Dynamics Land Systems (United Kingdom).","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 decreased to Red. This is primarily due to the following factors. 1. The programme remains on pause following issues identified during Exercise TITAN STORM, which led to a halt in vehicle acceptance and delivery activities from December 2025. 2. The current pause has delayed the completion of the Demonstration phase and it is likely that a re-approval will be required post a Ministerial decision regarding the future of the programme.","startDate":"2014-12-04","endDate":"2030-03-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remains unchanged 31/03/2030. This is primarily due to the following factors.","fyBaseline":365.34,"fyForecast":278.1,"fyVariance":23.88,"varianceNarrative":"The in-year varience exceeds 5%. This is primarily due to the following factors. 1. £40M CDEL was due to lack of Contract Change Proposal progress. The impact of the stop notice has caused additional reductions of c.£44M CDEL related to acceptance of vehicles and knock-on effect to vehicle production. 2. The RDEL variance is caused by a much lower demand for spares against the GD spares availability service requiring a DEL switch from CDEL to RDEL to apply the correct accounting treatment. There is no increase in the programme value as these reductions have been re-profiled into future years.","wholeLifeCost":8935.68,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) decreased from £7505.71M to £7470.12M This is primarily due to the following factors. 1. There are no significant changes to the budgeted Whole Life Costs of the programme. Due to the bulk of costs linked to the firm price contract with GD, variances presented in-year are related to reprofiling and therefore no overall impact on the programme. 2. The Armoured Cavalry Programme Approved Budgetary Limit has remained unchanged since 2015.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. There are no monetised benefits.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 decreased to Red. This is primarily due to the following factors. 1. The programme remains on pause following issues identified during Exercise TITAN STORM, which led to a halt in vehicle acceptance and delivery activities from December 2025. 2. The…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remains unchanged 31/03/2030. This is primarily due to the following factors.","narrativeClaimKind":null,"history":[{"id":"MOD_0091_1415-Q3","year":2020,"name":"Armoured Cavalry 2025","department":"MOD","category":"Military Capability","description":"To deliver an integrated multi-role capability that will include the delivery of the AJAX armoured fighting vehicle and its training solution into service.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber, which has not changed since last year�s Q2 1819 Amber, due primarily to the following factors; - The schedule remained stable between Q2 18/19 and Q2 19/20. - General Dynamics maintained their commitment to deliver the project during a recast of the contract in 2018. Since the Q2 1920 (30th September 2019) Amber IPA DCA, the following non-project operating environment activities have impacted the original Q2 IPA DCA; - COVID-19 has caused some short-term delays. The manufacture and acceptance of AJAX vehicles has been delayed by COVID-19 control measures. Since the Q2 1920 (30th September 2019) Amber IPA DCA, the following primary project actions have impacted the original Q2 IPA DCA; - An issue has come to light that could affect the safety operating clearance of AJAX's turret. Remedial engineering work to rectify the issue is causing some delay. - General Dynamics have been late to deliver appropriate safety cases for the AJAX vehicles, delaying the delivery of vehicles to the Army.","startDate":"2014-12-04","endDate":"2025-04-30","scheduleNarrative":"The scheduled baseline project end date at Q2 1920 (30th September 2019) is 30/04/25, has not changed since last year's Q2 1819 date of 30/04/25, due primarily to the following factors; - General Dynamics maintained their commitment to deliver the project during a recast of the contract in 2018. - The schedule remained stable between Q2 18/19 and Q2 19/20. Since the Q2 1920 (30th September 2019) baseline project end date of 30/04/25, the following non-project operating environment activities have impacted the original Q2 baseline project end date; - Delays to trials due to COVID-19 may affect the project end date although the impact is still being assessed. Since the Q2 1920 (30th September 2019) baseline project end date of 30/04/25, the following primary project actions have impacted the original Q2 baseline project end date; - The schedule to the project end date is being reassessed in light of General Dynamics' delay to deliver vehicles in line with the contract. At the moment there is no forecast change to the end date but there is an increased risk that it will be delayed. - An issue has come to light that could affect the safety operating clearance of AJAX's turret. Remedial engineering work to rectify the issue is causing some delay. This delay should not affect the end date of the project although the full impact is still being assessed.","fyBaseline":694.71,"fyForecast":643.0,"fyVariance":-7.0,"varianceNarrative":"The 19/20 in-year baseline / forecast variance at Q2 1920 (30th September 2019) of -7%, is due primarily to the following factors; - Reduction in AJAX support due to decreased vehicles being fielded from prime production contract. This meant a reduction in CLS forecast, inability to complete �BATUS� support milestone and reduction in planned levels of Capital spares due to inability to agree range, scaling and price of spares required. - Reduction in Infrastructure costs supporting AJAX programme as a result of reprofiling on sub projects projects which didn�t progress as quickly as expected. Since the Q2 1920 (30th September 2019) 19/20 in-year baseline / forecast variance of -7%, the following primary project actions have impacted the original Q2 19/20 in-year variance; - Reprofiling of expenditure between years and minimal variances to the overall AJAX Demonstration & Manufacture and Support forecasts will have occurred as a result of changes to programme timescales.","wholeLifeCost":6288.95,"costNarrative":"The baseline Whole Life Cost at Q2 1920 (30th September 2019) is �6,288.95 m, has decreased by �2.99 m since last year's Q2 1819 (�m) baseline Whole Life Cost of �6,291.94 m, due primarily to the following factors; - The primary reason for movement in AJAX WLC relates to reduced initial activities required to support the In-service AJAX vehicles. A years� worth of support costs would have been incurred between Q21819 and Q21920 and further certainty on the number/timing of vehicles being fielded into service from the prime production contract would be understood - this is now reduced so would shape revision of support costs. Since the Q2 1920 (30th September 2019) �6,288.95 m baseline Whole Life Cost, the following non-project operating environment activities have impacted the original baseline Q2 Whole Life Cost; - COVID-19 has caused some short-term delays. As the Prime Manufacturing and Support contract with GDUK is a firm price contract, there will be minimal affect on WLC if activity is moved into later months/years. Since the Q2 1920 (30th September 2019) �6,288.95 m baseline Whole Life Cost, the following primary project actions have impacted the original Q2 baseline Whole Life Cost; - No significant project actions have materially affected WLC. Reprofiling of expenditure between years and minimal variances to the overall AJAX Demonstration & Manufacture and Support forecasts will have occurred as a result of changes to programme timescales.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Technical & integration"],"evidenceExcerpt":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber, which has not changed since last year�s Q2 1819 Amber, due primarily to the following factors; - The schedule remained stable between Q2 18/19 and Q2 19/20. - General Dynamics maintained their commitment to deliver the project during a recast of the contract in…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2020","sourceLabel":"IPA Annual Report 2019-20","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The scheduled baseline project end date at Q2 1920 (30th September 2019) is 30/04/25, has not changed since last year's Q2 1819 date of 30/04/25, due primarily to the following factors; - General Dynamics maintained their commitment to deliver the project during a recast of the contract in 2018. - The schedule remained stable between Q2 18/19 and Q2 19/20. Since the Q2 1920 (30th September 2019) baseline project end date of 30/04/25, the following non-project operating environment activities have impacted the original Q2 baseline project end date; - Delays to trials due to COVID-19 may affect the project end date although the impact is still being assessed. Since the Q2 1920 (30th September 2019) baseline project end date of 30/04/25, the following primary project actions have impacted the original Q2 baseline project end date; - The schedule to the project end date is being reassessed in light of General Dynamics' delay to deliver vehicles in line with the contract. At the moment there is no forecast change to the end date but there is an increased risk that it will be delayed. - An issue has come to light that could affect the safety operating clearance of AJAX's turret. Remedial engineering work to rectify the issue is causing some delay. This delay should not affect the end date of the project although the full impact is still being assessed.","narrativeClaimKind":null},{"id":"MOD_0091_1415-Q3","year":2021,"name":"Armoured Cavalry 2025","department":"MOD","category":"Military Capability","description":"Ajax forms part of the Armoured Cavalry 2025 Programme. The aim of the programme is to deliver by 2025, a versatile and agile multi-role capability, operating at the heart of the Deep Reconnaissance Strike and Heavy Combat Brigades, that are able to succeed on current and future operations in the most complex and demanding operational environments. The multi-role Ajax armoured fighting vehicle will transform the Army's advanced intelligence, surveillance, target acquisition and reconnaissance capability as part of the war-fighting division. It will transform the way the Army conducts Deep Ground Reconnaissance and underpins the Army's ability to war fight at the divisional level through the Heavy Brigade Combat Teams. Each Ajax has extensive capabilities, including increased lethality through automated detection systems, a 40mm stabilised cannon able to fire on the move, acoustic detectors, a laser warning system, a local situational awareness system, a high-performance power pack, and best in class protection.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating increased from Amber to Red. This is primarily due to the following factors: The Senior Responsible Owner has adjusted the delivery confidence to Red overall. Delivery schedule delay of the Army's first vehicles meant that the Approved Initial Operating Capability baseline of July 20 was no longer achievable. This was reset to Jun 21 (Probability 50%) and Sep 21 (Probability 90%). In March 21 the Senior Responsible Owner commissioned an independent Gateway Review of the programme. This assessed the impact of late discovery technical issues during the demonstration phase of the project and the further work necessary to overcome them. It also identified a number of additional interventions necessary to de-risk the schedule to Full Operating Capability. The principle reasons for the delay experienced included a degree of optimism bias in the schedule for a new generation of armoured fighting vehicle, the technical challenges faced and evidence to support safety case generation, COVID-19 and delivery performance. A detailed action plan has been initiated to rectify the issues identified and all Full Operating Capability assumptions are being re-tested as part of this ongoing activity. Concurrently, all Initial Operating Capability vehicles have now been manufactured. Advanced First of Type training simulators have been delivered and the training of the Army's own Instructors on the ARES vehicle has commenced. The underlying technical issues now being worked through will be comprehensively addressed prior to declaration of the Ajax Initial Operating Capability.","startDate":"2014-01-22","endDate":"2025-04-30","scheduleNarrative":"Compared to financial year 19/20-Q2, the project's end-date remained scheduled to finish on 30 April 2025 . This is primarily due to the following factors: Work is ongoing to test the Full Operating Capability forecast date and any update will be published in due course.","fyBaseline":819.03,"fyForecast":634.37,"fyVariance":-23.0,"varianceNarrative":"The budget variance exceeds 5%. Reduction in forecast spend against financial year 20/21 Control Total is driven primarily by delays experienced in the manufacturing side of the programme with activity in the following areas re-profiled into future years: Delivery of fully built vehicles, Delivery of Peacetime and Military Combat Armour Kits for AJAX vehicles, Retrofit programme of work to uplift Drop 1 standard vehicles to Drop 3 standard build configuration. Turret integration work to assemble CTC 40mm Cannon to AJAX Turret. In relation to In Service Support, In service spares weren't ordered/delivered in line with assumed levels, seeing a reduction in year and reprofile of costs into future years.","wholeLifeCost":6353.94,"costNarrative":"Compared to financial year 19/20-Q2, the projects Baseline Whole Life Cost increased from �6288.95m to �6353.94m. This is primarily due to the following factors: The Whole Life Budgets in relation to AJAX are associated with the completion of Demonstration and Manufacture activities within the programme, resulting in the delivery of 589 AJAX vehicles. The Budgets also include In Service Support until 2025, which is primarily delivered through the contracted General Dynamics UK support solution. This element delivers a support framework and purchase of spares to support in service vehicles. Although the Baseline Forecast Budget from Q2 19/20 �6288.953m to Q4 20/21 �6353.940m appears to increase by �64.987 this is because historic budgets are not adjusted as Programme costs and budgets are rolled forward into future years. The Whole Life Budget c.�6.4Bn currently covers the period up to the end of Manufacture as per the Main Gate approval. The Whole Life Costs from Q2 19/20 �6143.994m to Q4 20/21 �6005.698m have actually reduced by �138.296m. Whole Life Cost reductions were driven by removal of the Fire, Support and Overwatch requirement from the Demonstration work within the AJAX programme. Also efficiencies were realised in the In Service Support costings where modelling identified further coverage from current contract arrangement (across spares and Contractor Logistic Support) this then enabled a costing reduction.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Workforce & capability","Technical & integration"],"evidenceExcerpt":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating increased from Amber to Red. This is primarily due to the following factors: The Senior Responsible Owner has adjusted the delivery confidence to Red overall. Delivery schedule delay of the Army's first vehicles meant that the Approved Initial…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 19/20-Q2, the project's end-date remained scheduled to finish on 30 April 2025 . This is primarily due to the following factors: Work is ongoing to test the Full Operating Capability forecast date and any update will be published in due course.","narrativeClaimKind":null},{"id":"MOD_0091_1415-Q3","year":2022,"name":"Armoured Cavalry 2025","department":"MOD","category":"Military Capability","description":"The Armoured Cavalry programme is central to the Army's Integrated Review and Future Soldier. It will deliver a multi-role Ground Mounted Reconnaissance capability, centred on the Ajax family of vehicles and their training and support systems, into service with the British Army. The six Ajax variants deliver a step change in capabilities compared to current in-service vehicles in the areas of Intelligence, Surveillance, Target Acquisition and Reconnaissance sensors, multi-domain integration, lethality, protection and mobility. Ajax will equip units in both Armour and Deep Reconnaissance and Strike Brigade Combat Teams in 3rd (United Kingdom) Division. 589 vehicles will be delivered through a firm priced contract with General Dynamics Land Systems (United Kingdom).","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Red. This is primarily due to the following factors: The Armoured Cavalry Programme is operating out of time, but within financial approval. There are technical issues with the Ajax platforms, for which design modifications have been identified. These are currently being trialled to assess their efficacy and Field Army use of the delivered vehicles is on hold until MOD is assured of their success. The impact of noise and vibration upon the overall programme schedule to Full Operating Capability has been significant. Significant effort is underway between the Army, DE&S and GDLS-UK to produce a jointly agreed, risk adjusted reset schedule, which is required to assure the programme and to provide confidence in deliverability, compliance and value for money.","startDate":"2014-01-22","endDate":"2025-04-30","scheduleNarrative":"Compared to 2021-Q4, the project end-date remained scheduled to finish on 30 April 2025 however, there is risk to this date. This is primarily due to the following factors: The time required to quantify, understand and address the issues of noise and vibration has had a significant impact upon all areas of the programme, but most particularly upon the already delayed Ajax production schedule. A jointly agreed, risk adjusted reset schedule is necessary to identify the impact to Full Operating Capability.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests)","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests)","benefits":null,"benefitsNarrative":"","themes":["Delivery & schedule","Scope & requirements","Commercial & supply chain","Cost & funding"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Red. This is primarily due to the following factors: The Armoured Cavalry Programme is operating out of time, but within financial approval. There are technical issues with the Ajax platforms, for which design modifications have been…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to 2021-Q4, the project end-date remained scheduled to finish on 30 April 2025 however, there is risk to this date. This is primarily due to the following factors: The time required to quantify, understand and address the issues of noise and vibration has had a significant impact upon all areas of the programme, but most particularly upon the already delayed Ajax production schedule. A jointly agreed, risk adjusted reset schedule is necessary to identify the impact to Full Operating Capability.","narrativeClaimKind":null},{"id":"MOD_0091_1415-Q3","year":2023,"name":"Armoured Cavalry 2025","department":"MOD","category":"Military Capability","description":"The Armoured Cavalry programme is central to the Army's Integrated Review and Future Soldier. It will deliver a multi-role Ground Mounted Reconnaissance capability, centred on the Ajax family of vehicles and their training and support systems, into service with the British Army. The six Ajax variants deliver a step change in capabilities compared to current in-service vehicles in the areas of Intelligence, Surveillance, Target Acquisition and Reconnaissance sensors, multi-domain integration, lethality, protection, and mobility. Ajax will equip units in both Armour and Deep Reconnaissance Strike Brigade Combat Teams in 3rd (United Kingdom) Division. 589 vehicles will be delivered through a firm-price contract with General Dynamics Land Systems (United Kingdom).","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 increased from Red to Amber. This is primarily due to the following factors. The impact of noise and vibration upon the overall programme schedule to Full Operating Capability has been significant. Significant effort has been made between the Army, Defence Equipment and Support and General Dynamics Land Systems UK to produce a jointly agreed, risk adjusted schedule. This is being used to reset programme approvals against increased confidence in deliverability, compliance, and value for money.","startDate":"2014-01-22","endDate":"2030-03-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 increased from 2025-04-30 to 2030-03-31. This is primarily due to the following factors. The time required to quantify, understand, and address the issues of Noise and Vibration has had a significant impact upon all areas of the programme, but most particularly upon the already delayed Ajax production schedule. A jointly agreed, risk adjusted reset schedule is in place out to Full Operating Capability.","fyBaseline":458.44,"fyForecast":325.55,"fyVariance":-29.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors: Delays in achieving an agreed Drop 3 Standard and the associated impact upon the vehicle build schedule. Turret Deliveries were also reduced in line with production causing a further underspend. The remaining in-year variance is split across Demonstration Phase Activities due to Noise and Vibration issues as well as Training Systems procurement; removal of Fire Support Overwatch assessment work and In-Service activities.","wholeLifeCost":6854.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 22/23-Q4 is 6854m. This is primarily due to the following factors. Re-profiling from earlier years and inflation, inclusion of contract change proposal assessments, potential requirement changes and an increase in raw materials and consumables.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This programme does not report cashable benefits. Its aim is to provision the armed forces with the equipment and / or infrastructure required.","themes":["Delivery & schedule","Cost & funding","Commercial & supply chain","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 increased from Red to Amber. This is primarily due to the following factors. The impact of noise and vibration upon the overall programme schedule to Full Operating Capability has been significant. Significant effort has been made…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 increased from 2025-04-30 to 2030-03-31. This is primarily due to the following factors. The time required to quantify, understand, and address the issues of Noise and Vibration has had a significant impact upon all areas of the programme, but most particularly upon the already delayed Ajax production schedule. A jointly agreed, risk adjusted reset schedule is in place out to Full Operating Capability.","narrativeClaimKind":null},{"id":"MOD_0091_1415-Q3","year":2024,"name":"Armoured Cavalry 2025","department":"MOD","category":"Military Capability","description":"The Armoured Cavalry programme is central to the Army’s Integrated Review and Future Soldier. It will deliver a multi-role Ground Mounted Reconnaissance capability, centred on the Ajax family of vehicles and their training and support systems, into service with the British Army. The six Ajax variants will deliver a step change in capabilities compared to current in-service vehicles in the areas of Intelligence, Surveillance, Target Acquisition and Reconnaissance sensors, multi-domain integration, lethality, protection, and mobility. Ajax will equip units in both Armour and Deep Reconnaissance Strike Brigade Combat Teams in 3rd (United Kingdom) Division. 589 vehicles will be delivered through a firm-price contract with General Dynamics Land Systems (United Kingdom).","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure and Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The impact of noise and vibration upon the overall programme schedule to Full Operating Capability has been substantial. Significant effort has been made between the Army, DE&S and General Dynamics Land Systems UK (GDLS-UK) to produce a jointly agreed, risk adjusted schedule, which is being progressed to reset programme approvals against increased confidence in deliverability, compliance, and value for money.","startDate":"2014-12-04","endDate":"2025-04-30","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained scheduled to finish on 2025-04-30. This is primarily due to the following factors. A jointly agreed, risk adjusted reset schedule is in place out to Full Operating Capability; the programme is operating to this pending formal approval of the schedule by the department and HM Treasury.","fyBaseline":314.42,"fyForecast":231.33,"fyVariance":-26.426,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The in-year variance (circa 83m underspent) is mainly due to the transition to the revised General Dynamic Land Systems (UK) (GD) Milestone Payment Plan that incentivises vehicle delivery and so moves 57m out of the current FY and in to future years. The remaining 26m reduction is driven by a slower ramp-up of Capability Drop 3 Production and Retrofit activities that was originally assumed. GD are currently operating 2 production lines and are working to resolve labour and supply chain issues that will enable them to expand to 4 production lines as planned.","wholeLifeCost":6979.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 increased from 6854m to 6979m. This is primarily due to the following factors. Most of the cost variances experienced over the past 12 months are re-profiling activity that affect the timing of costs rather than increases/decreases to the Whole Life Cost (WLC) total. For this reason there will have only been minor WLC changes (c.30m). The figure in the Budget WLC field reflects a 10yr budget figure, not the total WLC.","benefits":0.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 0m.","themes":["Cost & funding","Delivery & schedule","Workforce & capability","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure and Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The impact of noise and vibration upon the overall programme schedule to Full Operating Capability has been substantial. Significant effort has been made between…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":true,"narrativeExcerpt":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained scheduled to finish on 2025-04-30. This is primarily due to the following factors. A jointly agreed, risk adjusted reset schedule is in place out to Full Operating Capability; the programme is operating to this pending formal approval of the schedule by the department and HM Treasury.","narrativeClaimKind":"says-unchanged"},{"id":"MOD_0091_1415-Q3","year":2025,"name":"ARMOURED CAVALRY 2025","department":"MoD","category":"Military Capability","description":"The Armoured Cavalry Programme is central to the Army’s Integrated Review and Future Soldier. It will deliver a multi-role Ground Mounted Crewed Reconnaissance capability, centred on the Ajax family of vehicles and their training and support systems, into service with the British Army. The six Ajax variants deliver a step change in capabilities Compared to current in-service vehicles in the areas of Intelligence, Surveillance, Target Acquisition & Reconnaissance (ISTAR) sensors, multi-domain integration, lethality, protection, and mobility. 589 vehicles will be delivered through a firm-price contract with General Dynamics Land Systems (United Kingdom).","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Project's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER, compared with the Infrastructure and Projects Authority's assessment last year of AMBER. This is due to the following factors. The programme received an Amber rating at NISTA's 2024 Assurance Review. Although the impact of delays to trials and manufacture has been significant for the programme as a whole, the programme is and has been operating within its approvals since December 2022. Substantial effort has been made between the Army, Delivery Equipment and Support teams (DE and S) and GDLS-UK to maintain a joint and collaborative approach to all decisions and throughout the layers of programme management across organisations.","startDate":"2014-01-22","endDate":"2030-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 30/04/2025 to 31/03/2030. This is primarily due to the following factors. The jointly agreed, risk adjusted schedule is in place and planned out to Programme Closure (including a task breakdown of the Full Operating Capability milestone). The programme is operating within its current approval.","fyBaseline":334.65,"fyForecast":250.38,"fyVariance":25.18,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The in-year variance (circa -£83M) reflects a reprofiling of vehicle production and delivery as well as the associated payment milestones. There is no increase in the programme value as this is simply a reprofiling. Vehicle delivery meets the demand of the Army unit fielding plan and the Initial Operating Capability milestone. Vehicle deliveries are steadily increasing in each quarter.","wholeLifeCost":7505.71,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 6979 to 7505. This is primarily due to the following factors. The Armoured Cavalry programme's departmental-agreed Whole Life Cost* has increased. This is due to the way the Army forecasts Whole Life Costs. This should not be confused with the Armoured Cavalry Programme Approved Budgetary Limit which remains unchanged since 2015.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Workforce & capability"],"evidenceExcerpt":"The Project's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER, compared with the Infrastructure and Projects Authority's assessment last year of AMBER. This is due to the following factors. The programme received an Amber rating at NISTA's 2024 Assurance Review. Although the impact of delays to trials and manufacture has been significant for the…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 30/04/2025 to 31/03/2030. This is primarily due to the following factors. The jointly agreed, risk adjusted schedule is in place and planned out to Programme Closure (including a task breakdown of the Full Operating Capability milestone). The programme is operating within its current approval.","narrativeClaimKind":null},{"id":"MOD_0091_1415-Q3","year":2026,"name":"ARMOURED CAVALRY 2025","department":"MOD","category":"Military Capability","description":"The Armoured Cavalry Programme is central to the Army’s Integrated Review and Future Soldier. It will deliver a multi-role Ground Mounted Crewed Reconnaissance capability, centred on the Ajax family of vehicles and their training and support systems, into service with the British Army. The six Ajax variants deliver a step change in capability compared to current in-service vehicles in the areas of Intelligence, Surveillance, Target Acquisition & Reconnaissance (ISTAR) sensors, multi-domain integration, lethality, protection, and mobility. 589 vehicles will be delivered through a firm-price contract with General Dynamics Land Systems (United Kingdom).","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 decreased to Red. This is primarily due to the following factors. 1. The programme remains on pause following issues identified during Exercise TITAN STORM, which led to a halt in vehicle acceptance and delivery activities from December 2025. 2. The current pause has delayed the completion of the Demonstration phase and it is likely that a re-approval will be required post a Ministerial decision regarding the future of the programme.","startDate":"2014-12-04","endDate":"2030-03-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remains unchanged 31/03/2030. This is primarily due to the following factors.","fyBaseline":365.34,"fyForecast":278.1,"fyVariance":23.88,"varianceNarrative":"The in-year varience exceeds 5%. This is primarily due to the following factors. 1. £40M CDEL was due to lack of Contract Change Proposal progress. The impact of the stop notice has caused additional reductions of c.£44M CDEL related to acceptance of vehicles and knock-on effect to vehicle production. 2. The RDEL variance is caused by a much lower demand for spares against the GD spares availability service requiring a DEL switch from CDEL to RDEL to apply the correct accounting treatment. There is no increase in the programme value as these reductions have been re-profiled into future years.","wholeLifeCost":8935.68,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) decreased from £7505.71M to £7470.12M This is primarily due to the following factors. 1. There are no significant changes to the budgeted Whole Life Costs of the programme. Due to the bulk of costs linked to the firm price contract with GD, variances presented in-year are related to reprofiling and therefore no overall impact on the programme. 2. The Armoured Cavalry Programme Approved Budgetary Limit has remained unchanged since 2015.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. There are no monetised benefits.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 decreased to Red. This is primarily due to the following factors. 1. The programme remains on pause following issues identified during Exercise TITAN STORM, which led to a halt in vehicle acceptance and delivery activities from December 2025. 2. The…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remains unchanged 31/03/2030. This is primarily due to the following factors.","narrativeClaimKind":null}],"previous":{"id":"MOD_0091_1415-Q3","year":2025,"name":"ARMOURED CAVALRY 2025","department":"MoD","category":"Military Capability","description":"The Armoured Cavalry Programme is central to the Army’s Integrated Review and Future Soldier. It will deliver a multi-role Ground Mounted Crewed Reconnaissance capability, centred on the Ajax family of vehicles and their training and support systems, into service with the British Army. The six Ajax variants deliver a step change in capabilities Compared to current in-service vehicles in the areas of Intelligence, Surveillance, Target Acquisition & Reconnaissance (ISTAR) sensors, multi-domain integration, lethality, protection, and mobility. 589 vehicles will be delivered through a firm-price contract with General Dynamics Land Systems (United Kingdom).","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Project's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER, compared with the Infrastructure and Projects Authority's assessment last year of AMBER. This is due to the following factors. The programme received an Amber rating at NISTA's 2024 Assurance Review. Although the impact of delays to trials and manufacture has been significant for the programme as a whole, the programme is and has been operating within its approvals since December 2022. Substantial effort has been made between the Army, Delivery Equipment and Support teams (DE and S) and GDLS-UK to maintain a joint and collaborative approach to all decisions and throughout the layers of programme management across organisations.","startDate":"2014-01-22","endDate":"2030-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 30/04/2025 to 31/03/2030. This is primarily due to the following factors. The jointly agreed, risk adjusted schedule is in place and planned out to Programme Closure (including a task breakdown of the Full Operating Capability milestone). The programme is operating within its current approval.","fyBaseline":334.65,"fyForecast":250.38,"fyVariance":25.18,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The in-year variance (circa -£83M) reflects a reprofiling of vehicle production and delivery as well as the associated payment milestones. There is no increase in the programme value as this is simply a reprofiling. Vehicle delivery meets the demand of the Army unit fielding plan and the Initial Operating Capability milestone. Vehicle deliveries are steadily increasing in each quarter.","wholeLifeCost":7505.71,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 6979 to 7505. This is primarily due to the following factors. The Armoured Cavalry programme's departmental-agreed Whole Life Cost* has increased. This is due to the way the Army forecasts Whole Life Costs. This should not be confused with the Armoured Cavalry Programme Approved Budgetary Limit which remains unchanged since 2015.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Workforce & capability"],"evidenceExcerpt":"The Project's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER, compared with the Infrastructure and Projects Authority's assessment last year of AMBER. This is due to the following factors. The programme received an Amber rating at NISTA's 2024 Assurance Review. Although the impact of delays to trials and manufacture has been significant for the…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 30/04/2025 to 31/03/2030. This is primarily due to the following factors. The jointly agreed, risk adjusted schedule is in place and planned out to Programme Closure (including a task breakdown of the Full Operating Capability milestone). The programme is operating within its current approval.","narrativeClaimKind":null},"ratingDelta":1,"transition":"Worsened","endDateDeltaDays":0,"attentionScore":68,"attentionReasons":["Current published delivery confidence is Red","Published rating worsened from Amber to Red","In-year forecast variance is +23.9%"]},{"id":"MOD_0126_2021-Q4","year":2026,"name":"NEXT GENERATION (FIXED) COMMUNICATION NETWORK","department":"MOD","category":"Information and Communications Technology (ICT)","description":"The intent of the Next Generation Communications Network Programme is to evolve the existing service into a single logical consolidated enterprise network capability which is coherently architected. Addresses the current security and resilience concerns and drives greater value for money by transforming the MOD Core Network against agreed acceptance quality criteria to enable the closure of Defence Fixed Telecommunications Service legacy, whilst preparing for the future by procuring suppliers to take-on and continue transforming the enhanced core network with an under-pinning operating model which enables continuous improvement in business as usual. This is critical to Defence operations and maintaining strategic advantage; as the enhanced service is the foundation of the Digital Backbone.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 decreased to Red. This is primarily due to the following factors, an independent assurance review conducted in March 2026 rated the Programme as red due to the scheduled forecast at time of review reporting completion beyond the allocated funding to the Programme. Baseline reviews by the programme to revaluate and refine the delivery plans were ongoing at the time of the assurance review. An improved schedule has now been developed and will be assessed by the Review Team when they return to reassess progress performance in Q1 26/27 where an improvement to delivery confidence is anticipated.","startDate":"2021-04-28","endDate":"2030-03-25","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 decreased from 11/12/2030 to 30/08/2030. This is primarily due to the following factors. 1. Changes to the Programme approach to two key programmes on the critical path which has matured to remove some dependencies to enable greater concurrency of activity. 2. The programme schedule has matured with clear end states defined and success criteria to monitor the performance of the delivery being developed. 3. The delivery schedule is governed through monthly programme boards, quarterly Programme Boards and quarterly senior Defence reviews.","fyBaseline":22.0,"fyForecast":22.0,"fyVariance":22.0,"varianceNarrative":"Exempt under Section 22 – Information intended for future publication ​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4; the project's Departmental-agreed monetised benefits at 25/26-Q4 remained at £0m","themes":["Delivery & schedule","Governance & assurance","Cost & funding","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 decreased to Red. This is primarily due to the following factors, an independent assurance review conducted in March 2026 rated the Programme as red due to the scheduled forecast at time of review reporting completion beyond the allocated funding to…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 decreased from 11/12/2030 to 30/08/2030. This is primarily due to the following factors. 1. Changes to the Programme approach to two key programmes on the critical path which has matured to remove some dependencies to enable greater concurrency of activity. 2. The programme schedule has matured with clear end states defined and success criteria to monitor the performance of the delivery being developed. 3. The delivery schedule is governed through monthly programme boards, quarterly Programme Boards and quarterly senior Defence reviews.","narrativeClaimKind":null,"history":[{"id":"MOD_0126_2021-Q4","year":2021,"name":"Next Generation Communications Network","department":"MOD","category":"ICT","description":"The Next Generation Communications Network� programme is responsible for delivering the Ministry of Defences's future network in support of the Digital Backbone as well as ensuring that the Ministry of Defences's fixed network continues to function to agreed standards of resilience and performance during the bridging period until the Programme delivers its replacement services and solutions.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber/Green.This is primarily due to the following factors: The Next Generation Communications Network programme is currently in the Concept Phase and it's Strategic Outline Case Outletter was received in April 2021. The programme team will be submitting a detailed Outline Business Case�in October 2021 that will lay out firm objectives, and evidenced views on choices, preferred options, commercial strategy, costs and scope.","startDate":"2021-03-31","endDate":"2031-03-31","scheduleNarrative":"The project end-date is 31 March 2031. This is primarily due to the following factors: The Next Generation Communications Network programme is currently in the Concept Phase and it's Strategic Outline Case� Outletter was received in April 2021. The programme team will be submitting a detailed Outline Business Case�in October 2021 that will lay out firm objectives, and evidenced views on the programmes choices, preferred options, commercial strategy, costs and scope.","fyBaseline":0.0,"fyForecast":0.0,"fyVariance":null,"varianceNarrative":"The Next Generation Communications Network programme is currently in the Concept Phase and it's Strategic Outline Case�Outletter was received in April 2021. The programme team will be submitting a detailed Outline Business Case� in October 2021 that will lay out firm objectives, and evidenced views on the programmes choices, preferred options, commercial strategy, costs and scope. Therefore no cost data present at this stage.","wholeLifeCost":0.0,"costNarrative":"The Next Generation Communications Network programme is currently in the Concept Phase and it's Strategic Outline Case�Outletter was received in April 2021. The programme team will be submitting a detailed Outline Business Case�in October 2021 that will lay out firm objectives, and evidenced views on the programmes choices, preferred options, commercial strategy, costs and scope. Therefore no whole life cost data at this stage.","benefits":null,"benefitsNarrative":"","themes":["Approvals & decisions","Commercial & supply chain","Scope & requirements","Cost & funding"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber/Green.This is primarily due to the following factors: The Next Generation Communications Network programme is currently in the Concept Phase and it's Strategic Outline Case Outletter was received in April 2021. The programme team will be submitting a detailed Outline…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project end-date is 31 March 2031. This is primarily due to the following factors: The Next Generation Communications Network programme is currently in the Concept Phase and it's Strategic Outline Case� Outletter was received in April 2021. The programme team will be submitting a detailed Outline Business Case�in October 2021 that will lay out firm objectives, and evidenced views on the programmes choices, preferred options, commercial strategy, costs and scope.","narrativeClaimKind":null},{"id":"MOD_0126_2021-Q4","year":2022,"name":"Next Generation (fixed) Communication Network","department":"MOD","category":"ICT","description":"Next Generation Connectivity Network is a 10 year programme to update and simplify the Ministry of Defence's core Network. The Next Generation Communication Network Programme is responsible for delivering the Ministry of Defence's future network in support of the Digital Backbone as well as ensuring that the Ministry of Defence's fixed network continues to function to agreed standards of resilience and performance during the bridging period until the programme delivers its replacement services and solutions.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating decreased from Amber/Green to Amber. This is primarily due to the following factors. The removal of the incremental Amber/Green and Amber/Red assessments ratings. The programme remains in the concept phase and will submit an Outline Business Case in July 22","startDate":"2021-04-28","endDate":"2031-03-31","scheduleNarrative":"Compared to 2021-Q4, the project end-date remained scheduled to finish on 31 March 2031.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests)","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests)","benefits":null,"benefitsNarrative":"","themes":["Commercial & supply chain","Approvals & decisions","Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating decreased from Amber/Green to Amber. This is primarily due to the following factors. The removal of the incremental Amber/Green and Amber/Red assessments ratings. The programme remains in the concept phase and will submit an Outline Business…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to 2021-Q4, the project end-date remained scheduled to finish on 31 March 2031.","narrativeClaimKind":null},{"id":"MOD_0126_2021-Q4","year":2023,"name":"Next Generation (fixed) Communication Network","department":"MOD","category":"ICT","description":"The intent of the Next Generation (fixed) Communications Network Programme is to develop a secure; singular; modern enterprise network which connects sensors; effectors; and deciders across military and business domains.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. Whilst the programme Delivery Confidence Assessment is the same as it was 12 months ago, the programme has been maturing the Outline Business Case, which is now in place, addressing the cost and schedule challenges. A key focus for the programme now is active risk management of programme resourcing in highly skilled areas that are in sector wide shortages.","startDate":"2021-04-28","endDate":"2030-12-11","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 decreased from 2031-03-31 to 2030-12-11. This is primarily due to the following factors. The Programme schedule has recently been baselined following submission of the Outline Business Case.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This programme does not report cashable benefits. Its aim is to provision the armed forces with the equipment and / or infrastructure required.","themes":["Commercial & supply chain","Delivery & schedule","Cost & funding","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. Whilst the programme Delivery Confidence Assessment is the same as it was 12 months ago, the programme has been maturing the Outline Business Case, which is now in…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 decreased from 2031-03-31 to 2030-12-11. This is primarily due to the following factors. The Programme schedule has recently been baselined following submission of the Outline Business Case.","narrativeClaimKind":null},{"id":"MOD_0126_2021-Q4","year":2024,"name":"Next Generation (fixed) Communication Network","department":"MOD","category":"ICT","description":"The intent of the Next Generation (fixed) Communications Network (NGCN) Programme is to develop a secure; singular; modern enterprise network which connects sensors; effectors; and deciders across military and business domains. NGCN will form a key part of the Digital Backbone for Defence; delivering network services and technical components that are essential to the delivery of the Digital Strategy for Defence.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 decreased from Amber to Red. This is primarily due to the following factors. The risk, complexity and cost to migrating existing services are greater than previously anticipated. A new schedule to time and cost is currently awaiting approval. Once approved the programme can proceed with market engagement. Due to sector wide shortages in highly skilled areas recruitment continues to threaten the delivery schedule.","startDate":"2021-04-28","endDate":"2030-12-11","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained on schedule to finish on 2030-12-11. This primarily due to the following factors. The programme schedule has been revised to take into account further understanding of the complexity of transitioning to new services without compromising current capability. This has not impacted the overall schedule.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests)","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":0.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 0m.","themes":["Delivery & schedule","Commercial & supply chain","Cost & funding","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 decreased from Amber to Red. This is primarily due to the following factors. The risk, complexity and cost to migrating existing services are greater than previously anticipated. A new schedule to time and cost is currently awaiting…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained on schedule to finish on 2030-12-11. This primarily due to the following factors. The programme schedule has been revised to take into account further understanding of the complexity of transitioning to new services without compromising current capability. This has not impacted the overall schedule.","narrativeClaimKind":null},{"id":"MOD_0126_2021-Q4","year":2025,"name":"NEXT GENERATION (FIXED) COMMUNICATION NETWORK","department":"MoD","category":"Military Capability","description":"The intent of the Next Generation Communications Network (NGCN) Programme is to develop a secure, singular, modern enterprise network which connects sensors, effectors and deciders across military and business domains. NGCN will form a key part of the Digital Backbone for Defence, delivering network services and technical components.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 increased from RED to AMBER. This is primarily due to the following factors. The programme was reset with the issuance of a new mandate in March 2024. An independent Assurance Review in June 2024 assessed Delivery Confidence as Amber noting that significant progress had been made. An updated Outline Business Case was approved in October 2024 and the programme is now preparing for market engagement. A Delivery Partner was onboarded in February 2025 to support delivery.","startDate":"2021-04-28","endDate":"2030-12-11","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 11/12/2030. This is primarily due to the following factors.","fyBaseline":304.82,"fyForecast":244.46,"fyVariance":19.8,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. An out-turn of 20% underspend of budget due mainly to current supplier performance in the delayed delivery of network improvement changes under existing contract arrangements.","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0.","themes":["Delivery & schedule","Commercial & supply chain","Cost & funding","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 increased from RED to AMBER. This is primarily due to the following factors. The programme was reset with the issuance of a new mandate in March 2024. An independent Assurance Review in June 2024 assessed Delivery Confidence as Amber noting that significant progress…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 11/12/2030. This is primarily due to the following factors.","narrativeClaimKind":null},{"id":"MOD_0126_2021-Q4","year":2026,"name":"NEXT GENERATION (FIXED) COMMUNICATION NETWORK","department":"MOD","category":"Information and Communications Technology (ICT)","description":"The intent of the Next Generation Communications Network Programme is to evolve the existing service into a single logical consolidated enterprise network capability which is coherently architected. Addresses the current security and resilience concerns and drives greater value for money by transforming the MOD Core Network against agreed acceptance quality criteria to enable the closure of Defence Fixed Telecommunications Service legacy, whilst preparing for the future by procuring suppliers to take-on and continue transforming the enhanced core network with an under-pinning operating model which enables continuous improvement in business as usual. This is critical to Defence operations and maintaining strategic advantage; as the enhanced service is the foundation of the Digital Backbone.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 decreased to Red. This is primarily due to the following factors, an independent assurance review conducted in March 2026 rated the Programme as red due to the scheduled forecast at time of review reporting completion beyond the allocated funding to the Programme. Baseline reviews by the programme to revaluate and refine the delivery plans were ongoing at the time of the assurance review. An improved schedule has now been developed and will be assessed by the Review Team when they return to reassess progress performance in Q1 26/27 where an improvement to delivery confidence is anticipated.","startDate":"2021-04-28","endDate":"2030-03-25","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 decreased from 11/12/2030 to 30/08/2030. This is primarily due to the following factors. 1. Changes to the Programme approach to two key programmes on the critical path which has matured to remove some dependencies to enable greater concurrency of activity. 2. The programme schedule has matured with clear end states defined and success criteria to monitor the performance of the delivery being developed. 3. The delivery schedule is governed through monthly programme boards, quarterly Programme Boards and quarterly senior Defence reviews.","fyBaseline":22.0,"fyForecast":22.0,"fyVariance":22.0,"varianceNarrative":"Exempt under Section 22 – Information intended for future publication ​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4; the project's Departmental-agreed monetised benefits at 25/26-Q4 remained at £0m","themes":["Delivery & schedule","Governance & assurance","Cost & funding","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 decreased to Red. This is primarily due to the following factors, an independent assurance review conducted in March 2026 rated the Programme as red due to the scheduled forecast at time of review reporting completion beyond the allocated funding to…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 decreased from 11/12/2030 to 30/08/2030. This is primarily due to the following factors. 1. Changes to the Programme approach to two key programmes on the critical path which has matured to remove some dependencies to enable greater concurrency of activity. 2. The programme schedule has matured with clear end states defined and success criteria to monitor the performance of the delivery being developed. 3. The delivery schedule is governed through monthly programme boards, quarterly Programme Boards and quarterly senior Defence reviews.","narrativeClaimKind":null}],"previous":{"id":"MOD_0126_2021-Q4","year":2025,"name":"NEXT GENERATION (FIXED) COMMUNICATION NETWORK","department":"MoD","category":"Military Capability","description":"The intent of the Next Generation Communications Network (NGCN) Programme is to develop a secure, singular, modern enterprise network which connects sensors, effectors and deciders across military and business domains. NGCN will form a key part of the Digital Backbone for Defence, delivering network services and technical components.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 increased from RED to AMBER. This is primarily due to the following factors. The programme was reset with the issuance of a new mandate in March 2024. An independent Assurance Review in June 2024 assessed Delivery Confidence as Amber noting that significant progress had been made. An updated Outline Business Case was approved in October 2024 and the programme is now preparing for market engagement. A Delivery Partner was onboarded in February 2025 to support delivery.","startDate":"2021-04-28","endDate":"2030-12-11","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 11/12/2030. This is primarily due to the following factors.","fyBaseline":304.82,"fyForecast":244.46,"fyVariance":19.8,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. An out-turn of 20% underspend of budget due mainly to current supplier performance in the delayed delivery of network improvement changes under existing contract arrangements.","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0.","themes":["Delivery & schedule","Commercial & supply chain","Cost & funding","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 increased from RED to AMBER. This is primarily due to the following factors. The programme was reset with the issuance of a new mandate in March 2024. An independent Assurance Review in June 2024 assessed Delivery Confidence as Amber noting that significant progress…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 11/12/2030. This is primarily due to the following factors.","narrativeClaimKind":null},"ratingDelta":1,"transition":"Worsened","endDateDeltaDays":-261,"attentionScore":67,"attentionReasons":["Current published delivery confidence is Red","Published rating worsened from Amber to Red","In-year forecast variance is +22.0%"]},{"id":"BEIS_0008_2021-Q3","year":2026,"name":"SELLAFIELD PRODUCT AND RESIDUE STORE RETREATMENT PLANT PROJECT","department":"DESNZ","category":"Infrastructure and Construction","description":"The Sellafield Product & Residue Store Retreatment Plant (SRP) project is a key element of the Sellafield Ltd ’Special Nuclear Materials Future State Programme (SNMFSP)’. The SRP is a complex major project required to provide the capability to receive special nuclear material in existing packages, from existing stores on the Sellafield site, and process the material into a form and package suitable for safe and secure long-term interim storage.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 decreased to Amber. This is primarily due to the following factors: - Impact relating to the legislative changes of Passive Fire Protection standards and the implementation of the changes to the Building Safety Act (2022) following the Grenfell Tower Inquiry. The legislative changes will require a significant amount of engineering design rework and additional installation work in the new facility; the key impact is expected to be on the schedule to achieve readiness of the facility for Glove box installation. - The project has also been impacted by extraordinary inflation and Industrial Action. This will result in a request to DESNZ PIC for P80 cost and schedule contingency sanction relief when appropriate. This is essential to restore contingency levels necessary for project completion.","startDate":"2012-03-01","endDate":"2031-06-24","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 increased from 01/04/2030 to 24/06/2031. This 15 month movement is reflective of the impact of legislative changes to Passive Fire Protection standards.","fyBaseline":235.24,"fyForecast":208.61,"fyVariance":11.32,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors: - Assessed Impact of Passive Fire Protection legislative change & Industrial Action. - Screw & Batch Furnaces reflect overspends and prolongation of scope due to supplier & technical issues.","wholeLifeCost":1432.89,"costNarrative":"The increase to the project's departmentally agreed Whole Life Cost at 25/26-Q4 is primarily due to: - Annual Indexation, in line with the agreed indices.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors There are no monetised benefits defined within the Sellafield Product & Residue Store Retreatment Plant (SRP) FBC. SRP will provide key capabilities which will enable the delivery of benefits to the Special Nuclear Materials (SNM) Future State Programme at Sellafield. The retreatment and repackaging capability provided will reduce the risk associated with current plutonium storage conditions at Sellafield. The UK has the largest inventory of separated civil plutonium in the world, most of which is stored at Sellafield, safe and secure management of this material is a priority. SNM has identified three long term benefits that will be fully realised once all plutonium packages have been retreated or repackaged and consolidated within modern storage facilities. - Enhanced nuclear Safety & Security. - Improved high security resilience and a reduction in the number of Category-1 facilities. - Value for money by reducing the size of the delivery organisation required for managing future plutonium stocks.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 decreased to Amber. This is primarily due to the following factors: - Impact relating to the legislative changes of Passive Fire Protection standards and the implementation of the changes to the Building Safety Act (2022) following the Grenfell Tower…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 increased from 01/04/2030 to 24/06/2031. This 15 month movement is reflective of the impact of legislative changes to Passive Fire Protection standards.","narrativeClaimKind":null,"history":[{"id":"BEIS_0008_2021-Q3","year":2021,"name":"Sellafield Product and Residue Store Retreatment Plant","department":"BEIS","category":"Infrastructure and Construction","description":"To provide a facility that will receive special nuclear material from existing stores on the Sellafield site and process into a form suitable for safe and secure storage until 2120.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber/red.This is primarily due to the following factors: This is a complex, \"first of a kind\" nuclear project, and as such has a high degree of delivery risk. Full Business Case (FBC) progressing towards HMG approval in Q1 2021. The Full Business Case (FBC) is based on the Major Project Baseline developed with Programme & Project Partners (PPP) and a matured view of the project scope and market informed cost and schedule information. Pending FBC approval the project performance continues to be reported against the Outline Business Case (OBC) approved in 2017. Delivery of the project has been affected by Covid-19 since March 2020 with significant efforts ongoing to minimise impact on overall cost and schedule. This report only includes COVID impact up to June 2021, and there is evidence that Lockdown 3 has indeed caused efficiency losses in design completion by limited attendance in the office. Site construction has remained 'resilient' due to the robust COVID measures and management put in place; which enabled the progress of the main civil works, with completion of the main slab to the revised COVID impacted plan.","startDate":"2012-03-01","endDate":"2026-11-02","scheduleNarrative":"The project end-date is 02 November 2026. This is primarily due to the following factors: The project end date reflected in the Outline Business Case, 02 November 2026. The Full Business Case (FBC) baseline is finalised, and the Programme and Project Partners Major Project Baseline have set in the project completion date of February 2029. The FBC is currently going through NDA & HMG approvals (forecast June 2021 vs planned September 2021).","fyBaseline":86.24,"fyForecast":64.28,"fyVariance":-25.0,"varianceNarrative":"The budget variance exceeds 5%. The Full Business Case (FBC) baseline is finalised, and the Programme and Project Partners (PPP) Major Project Baseline have been set. This will result in a revised budget for Financial Year 2020/21 of �61m, the SRP project have reprofiled scope as part of their revised delivery strategy, this includes in the impact of COVID-19 up until the end of June 2021. The will result in a variance less than 5%.","wholeLifeCost":763.98,"costNarrative":"The projects Baseline Whole Life Cost is �763.98m. This is primarily due to the following factors: The whole lifetime cost is based on the last approved Outline Business Case. The forecast information in this submission is based around the Full Business Case (FBC) progressing towards HMG approval in Q1 2021. The FBC is based on the Major Project Baseline developed with Programme and Project Partners and a matured view of the project scope and market informed cost and schedule information. The project FBC has undergone extensive assurance during its development. The FBC baseline gives a project completion date of February.","benefits":null,"benefitsNarrative":"","themes":["Delivery & schedule","Approvals & decisions","Cost & funding","Scope & requirements"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber/red.This is primarily due to the following factors: This is a complex, \"first of a kind\" nuclear project, and as such has a high degree of delivery risk. Full Business Case (FBC) progressing towards HMG approval in Q1 2021. The Full Business Case (FBC) is based on the…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project end-date is 02 November 2026. This is primarily due to the following factors: The project end date reflected in the Outline Business Case, 02 November 2026. The Full Business Case (FBC) baseline is finalised, and the Programme and Project Partners Major Project Baseline have set in the project completion date of February 2029. The FBC is currently going through NDA & HMG approvals (forecast June 2021 vs planned September 2021).","narrativeClaimKind":null},{"id":"BEIS_0008_2021-Q3","year":2022,"name":"Sellafield Product and Residue Store Retreatment Plant","department":"BEIS","category":"Infrastructure and Construction","description":"To provide a facility that will receive special nuclear material from existing stores on the Sellafield site and process into a form suitable for safe and secure storage until 2120.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 decreased from Amber/red to Amber This is a complex, \"first of a kind\" nuclear project, and as such has a high degree of delivery risk. Full Business Case (FBC) achieved HMG approval in Q2 2021. The Full Business Case (FBC) is based on the Major Project Baseline developed with Programme & Project Partners (PPP) and a matured view of the project scope and market informed cost and schedule information.","startDate":"2012-03-01","endDate":"2029-08-20","scheduleNarrative":"Compared to 2021-Q4, your project end-date increased from 02 NOV 2026 to 20 AUG 2029 . This is primarily due to the following factors: The Full Business Case (FBC) was approved in July 2021, and the Programme and Project Partners (PPP) Major Project Baseline have been set. This result in a revised project end date of the 20th August 2029.","fyBaseline":113.54,"fyForecast":111.79,"fyVariance":-2.0,"varianceNarrative":"The GMPP project did not provide data","wholeLifeCost":1278.0,"costNarrative":"Compared to2021-Q4, the projects Baseline Whole Life Cost increased from 763.98 (£m) to 1277.71 (£m). This is primarily due to the following factors: The whole lifetime cost is based on the last approved Full Business Case. The FBC is based on the Major Project Baseline developed with Programme and Project Partners and a matured view of the project scope and market informed cost and schedule information. The project FBC has undergone extensive assurance during its development. The FBC baseline has a project P50 completion date of August 29 and the PPP 'offered' target is February 29.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 decreased from Amber/red to Amber This is a complex, \"first of a kind\" nuclear project, and as such has a high degree of delivery risk. Full Business Case (FBC) achieved HMG approval in Q2 2021. The Full Business Case (FBC) is based…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to 2021-Q4, your project end-date increased from 02 NOV 2026 to 20 AUG 2029 . This is primarily due to the following factors: The Full Business Case (FBC) was approved in July 2021, and the Programme and Project Partners (PPP) Major Project Baseline have been set. This result in a revised project end date of the 20th August 2029.","narrativeClaimKind":null},{"id":"BEIS_0008_2021-Q3","year":2023,"name":"Sellafield Product and Residue Store Retreatment Plant","department":"DESNZ","category":"Infrastructure and Construction","description":"To provide a facility that will receive special nuclear material from existing stores on the Sellafield site and process into a form suitable for safe and secure storage until 2120.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 increased from Amber (IPA rating) to Green (SRO rating). This is primarily due to the following factors. This is a complex, first of a kind nuclear project, and as such has a high degree of delivery risk. The SRP project is being delivered by the Programme and Project Partnership (PPP). The IPA afforded this project a RAG rating of GREEN.","startDate":"2012-03-01","endDate":"2029-10-09","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 increased from 2029-08-20 to 2029-10-09. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 increased from 2029-08-20 to 2029-10-09. This is primarily due to the following factors. Following the approval of an adjustment event associated with covid impact (from June 2021 to the end of March 22), there was a update to the baseline to reflect the schedule adjustment.","fyBaseline":210.08,"fyForecast":171.46,"fyVariance":-18.0,"varianceNarrative":"The variance between the 22/23 baseline and actual is due to several factors: The project has made a number of true savings against the FBC on the scope delivered to date, there has been positive management action taken to secure supply chain contracts for less than the budget. In addition, the project was able to deliver 19.5m of the working plan last financial year in order to de-risk the forward schedule.","wholeLifeCost":1380.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 increased from 1278m. to 1380m. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 increased from 1278m. to 1380m. This is primarily due to the following factors. Compared to 21/22-Q4, the SRP budgeted cost (baseline) has increased by 102.5m. 97.5m is due to escalation in line with the agreed indices. In addition, an approved adjustment event for covid impact was implemented increasing the baseline by a further 5m.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. The project did not provide departmental-agree monetised benefits at 22/23-Q4. There are no monetised benefits defined within the Sellafield Product & Residue Store Retreatment Plant (SRP) FBC. SRP will provide key capabilities which will enable the delivery of benefits to the Special Nuclear Materials (SNM) Future State Programme at Sellafield. The retreatment and repackaging capability provided will reduce the risk associated with current plutonium storage conditions at Sellafield. The UK has the largest inventory of separated civil plutonium in the world, most of which is stored at Sellafield, safe and secure management of this material is a priority. SNM has identified three long term benefits that will be fully realised once all plutonium packages have been retreated or repackaged and consolidated within modern storage facilities. Enhanced nuclear Safety & Security. Improved high security resilience and a reduction in the number of Category-1 facilities. Value for money by reducing the size of the delivery organisation required for managing future plutonium stocks.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 increased from Amber (IPA rating) to Green (SRO rating). This is primarily due to the following factors. This is a complex, first of a kind nuclear project, and as such has a high degree of delivery risk. The SRP project is being delivered by the Programme and Project…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 increased from 2029-08-20 to 2029-10-09. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 increased from 2029-08-20 to 2029-10-09. This is primarily due to the following factors. Following the approval of an adjustment event associated with covid impact (from June 2021 to the end of March 22), there was a update to the baseline to reflect the schedule adjustment.","narrativeClaimKind":null},{"id":"BEIS_0008_2021-Q3","year":2024,"name":"Sellafield Product and Residue Store Retreatment Plant","department":"DESNZ","category":"Infrastructure and Construction","description":"To provide a facility that will receive special nuclear material from existing stores on the Sellafield site and process into a form suitable for safe and secure storage until 2120.","ipaDca":"Green","sroDca":null,"deliveryConfidence":"Green","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Delivery Confidence Assessment rating at 23/24-Q4 remained at Green(IPA rating). This is primarily due to the following factors. This is a complex, \"first of a kind\" nuclear project, and as such has a high degree of delivery risk. Earlier this financial year the IPA completed their annual independent 'Gate 0' review affording the SRP Project a DCA Rating of Green.","startDate":"2012-03-01","endDate":"2029-10-09","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2029-10-09. This is primarily due to the following factors. There has been no movement to the projects end date.","fyBaseline":239.15,"fyForecast":198.45,"fyVariance":-17.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The variance between the 23/24 baseline (239.15m) and actuals (198.45m) is due to the impact of delays on site with construction activities and prolongation of offsite manufacturing packages of work.","wholeLifeCost":1433.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 increased from 1380m. to 1433m. This is primarily due to the following factors. The SRP budgeted cost (baseline) has increased by 52m. This is due to escalation in line with the agreed indices.","benefits":0.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 0m. There are no monetised benefits defined within the Sellafield Product & Residue Store Retreatment Plant (SRP) FBC. SRP will provide key capabilities which will enable the delivery of benefits to the 'Special Nuclear Materials (SNM) Future State Programme' at Sellafield. The retreatment and repackaging capability provided will reduce the risk associated with current plutonium storage conditions at Sellafield. The UK has the largest inventory of separated civil plutonium in the world, most of which is stored at Sellafield, safe and secure management of this material is a priority. SNM has identified three long term benefits that will be fully realised once all plutonium packages have been retreated or repackaged and consolidated within modern storage facilities. . Enhanced nuclear Safety & Security. . Improved high security resilience and a reduction in the number of Category-1 facilities. . Value for money by reducing the size of the delivery organisation required for managing future plutonium stocks.","themes":["Cost & funding","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Delivery Confidence Assessment rating at 23/24-Q4 remained at Green(IPA rating). This is primarily due to the following factors. This is a complex, \"first of a kind\" nuclear project, and as such has a high degree of delivery risk. Earlier this financial year the IPA completed their annual independent 'Gate 0' review…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2029-10-09. This is primarily due to the following factors. There has been no movement to the projects end date.","narrativeClaimKind":null},{"id":"BEIS_0008_2021-Q3","year":2025,"name":"SELLAFIELD PRODUCT AND RESIDUE STORE RETREATMENT PLANT PROJECT","department":"DESNZ","category":"Infrastructure and Construction","description":"The Sellafield Product & Residue Store Retreatment Plant (SRP) project will provide key capabilities as a key part of the Sellafield Ltd 'Special Nuclear Materials (SNM) Future State Programme'. This is a complex project required to provide the capability to receive special nuclear material in existing packages, from existing stores on the Sellafield site, and process the material into a form and package suitable for safe and secure long-term interim storage.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at GREEN. This is primarily due to the following factors‚ This is a complex nuclear project on an operational nuclear site. The Project is in the execution stage and continues with the final stages of bulk civil construction, is transitioning into mechanical and electrical fit out and is currently showing no significant threat to the overall P80 schedule. The SRP project is being delivered by the Programme and Project Partnership (PPP). The IPA afforded this project a RAG rating of GREEN.","startDate":"2012-03-01","endDate":"2030-04-01","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 09/10/2029 to 01/04/2030. This is primarily due to the following factors‚ The project end date has moved as a result of baseline change for P80 drawdown due to delays incurred by the global shortage of microchips and semiconductors. This movement and the project end date remains within the overall P80 dates approved in the Full Business Case (FBC).","fyBaseline":256.87,"fyForecast":221.92,"fyVariance":13.61,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The in year spend is less than the budget (baseline) for 2024/25 primarily due to the agreed annual funding allocation and un-utilisation of the full contingency allocated to FY24/25.","wholeLifeCost":1471.12,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 1433 to 1471. This is primarily due to the following factors‚ Compared to 23/24-Q4, the SRP budgeted cost (baseline) has increased by ~£38m, this is due to £21m of escalation in line with agreed indices, and £17m as a result of baseline change for P80 drawdown due to delays incurred by the global shortage of microchips and semiconductors.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ There are no monetised benefits defined within the Sellafield Product & Residue Store Retreatment Plant (SRP) FBC. SRP will provide key capabilities which will enable the delivery of benefits to the ‘Special Nuclear Materials (SNM) Future State Programme’ at Sellafield. The retreatment and repackaging capability provided will reduce the risk associated with current plutonium storage conditions at Sellafield. The UK has the largest inventory of separated civil plutonium in the world, most of which is stored at Sellafield, safe and secure management of this material is a priority. SNM has identified three long term benefits that will be fully realised once all plutonium packages have been retreated or repackaged and consolidated within modern storage facilities. • Enhanced nuclear Safety & Security. • Improved high security resilience and a reduction in the number of Category-1 facilities. • Value for money by reducing the size of the delivery organisation required for managing future plutonium stocks.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at GREEN. This is primarily due to the following factors‚ This is a complex nuclear project on an operational nuclear site. The Project is in the execution stage and continues with the final stages of bulk civil…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 09/10/2029 to 01/04/2030. This is primarily due to the following factors‚ The project end date has moved as a result of baseline change for P80 drawdown due to delays incurred by the global shortage of microchips and semiconductors. This movement and the project end date remains within the overall P80 dates approved in the Full Business Case (FBC).","narrativeClaimKind":null},{"id":"BEIS_0008_2021-Q3","year":2026,"name":"SELLAFIELD PRODUCT AND RESIDUE STORE RETREATMENT PLANT PROJECT","department":"DESNZ","category":"Infrastructure and Construction","description":"The Sellafield Product & Residue Store Retreatment Plant (SRP) project is a key element of the Sellafield Ltd ’Special Nuclear Materials Future State Programme (SNMFSP)’. The SRP is a complex major project required to provide the capability to receive special nuclear material in existing packages, from existing stores on the Sellafield site, and process the material into a form and package suitable for safe and secure long-term interim storage.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 decreased to Amber. This is primarily due to the following factors: - Impact relating to the legislative changes of Passive Fire Protection standards and the implementation of the changes to the Building Safety Act (2022) following the Grenfell Tower Inquiry. The legislative changes will require a significant amount of engineering design rework and additional installation work in the new facility; the key impact is expected to be on the schedule to achieve readiness of the facility for Glove box installation. - The project has also been impacted by extraordinary inflation and Industrial Action. This will result in a request to DESNZ PIC for P80 cost and schedule contingency sanction relief when appropriate. This is essential to restore contingency levels necessary for project completion.","startDate":"2012-03-01","endDate":"2031-06-24","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 increased from 01/04/2030 to 24/06/2031. This 15 month movement is reflective of the impact of legislative changes to Passive Fire Protection standards.","fyBaseline":235.24,"fyForecast":208.61,"fyVariance":11.32,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors: - Assessed Impact of Passive Fire Protection legislative change & Industrial Action. - Screw & Batch Furnaces reflect overspends and prolongation of scope due to supplier & technical issues.","wholeLifeCost":1432.89,"costNarrative":"The increase to the project's departmentally agreed Whole Life Cost at 25/26-Q4 is primarily due to: - Annual Indexation, in line with the agreed indices.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors There are no monetised benefits defined within the Sellafield Product & Residue Store Retreatment Plant (SRP) FBC. SRP will provide key capabilities which will enable the delivery of benefits to the Special Nuclear Materials (SNM) Future State Programme at Sellafield. The retreatment and repackaging capability provided will reduce the risk associated with current plutonium storage conditions at Sellafield. The UK has the largest inventory of separated civil plutonium in the world, most of which is stored at Sellafield, safe and secure management of this material is a priority. SNM has identified three long term benefits that will be fully realised once all plutonium packages have been retreated or repackaged and consolidated within modern storage facilities. - Enhanced nuclear Safety & Security. - Improved high security resilience and a reduction in the number of Category-1 facilities. - Value for money by reducing the size of the delivery organisation required for managing future plutonium stocks.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 decreased to Amber. This is primarily due to the following factors: - Impact relating to the legislative changes of Passive Fire Protection standards and the implementation of the changes to the Building Safety Act (2022) following the Grenfell Tower…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 increased from 01/04/2030 to 24/06/2031. This 15 month movement is reflective of the impact of legislative changes to Passive Fire Protection standards.","narrativeClaimKind":null}],"previous":{"id":"BEIS_0008_2021-Q3","year":2025,"name":"SELLAFIELD PRODUCT AND RESIDUE STORE RETREATMENT PLANT PROJECT","department":"DESNZ","category":"Infrastructure and Construction","description":"The Sellafield Product & Residue Store Retreatment Plant (SRP) project will provide key capabilities as a key part of the Sellafield Ltd 'Special Nuclear Materials (SNM) Future State Programme'. This is a complex project required to provide the capability to receive special nuclear material in existing packages, from existing stores on the Sellafield site, and process the material into a form and package suitable for safe and secure long-term interim storage.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at GREEN. This is primarily due to the following factors‚ This is a complex nuclear project on an operational nuclear site. The Project is in the execution stage and continues with the final stages of bulk civil construction, is transitioning into mechanical and electrical fit out and is currently showing no significant threat to the overall P80 schedule. The SRP project is being delivered by the Programme and Project Partnership (PPP). The IPA afforded this project a RAG rating of GREEN.","startDate":"2012-03-01","endDate":"2030-04-01","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 09/10/2029 to 01/04/2030. This is primarily due to the following factors‚ The project end date has moved as a result of baseline change for P80 drawdown due to delays incurred by the global shortage of microchips and semiconductors. This movement and the project end date remains within the overall P80 dates approved in the Full Business Case (FBC).","fyBaseline":256.87,"fyForecast":221.92,"fyVariance":13.61,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The in year spend is less than the budget (baseline) for 2024/25 primarily due to the agreed annual funding allocation and un-utilisation of the full contingency allocated to FY24/25.","wholeLifeCost":1471.12,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 1433 to 1471. This is primarily due to the following factors‚ Compared to 23/24-Q4, the SRP budgeted cost (baseline) has increased by ~£38m, this is due to £21m of escalation in line with agreed indices, and £17m as a result of baseline change for P80 drawdown due to delays incurred by the global shortage of microchips and semiconductors.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ There are no monetised benefits defined within the Sellafield Product & Residue Store Retreatment Plant (SRP) FBC. SRP will provide key capabilities which will enable the delivery of benefits to the ‘Special Nuclear Materials (SNM) Future State Programme’ at Sellafield. The retreatment and repackaging capability provided will reduce the risk associated with current plutonium storage conditions at Sellafield. The UK has the largest inventory of separated civil plutonium in the world, most of which is stored at Sellafield, safe and secure management of this material is a priority. SNM has identified three long term benefits that will be fully realised once all plutonium packages have been retreated or repackaged and consolidated within modern storage facilities. • Enhanced nuclear Safety & Security. • Improved high security resilience and a reduction in the number of Category-1 facilities. • Value for money by reducing the size of the delivery organisation required for managing future plutonium stocks.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at GREEN. This is primarily due to the following factors‚ This is a complex nuclear project on an operational nuclear site. The Project is in the execution stage and continues with the final stages of bulk civil…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 09/10/2029 to 01/04/2030. This is primarily due to the following factors‚ The project end date has moved as a result of baseline change for P80 drawdown due to delays incurred by the global shortage of microchips and semiconductors. This movement and the project end date remains within the overall P80 dates approved in the Full Business Case (FBC).","narrativeClaimKind":null},"ratingDelta":1,"transition":"Worsened","endDateDeltaDays":449,"attentionScore":67,"attentionReasons":["Current published delivery confidence is Amber","Published rating worsened from Green to Amber","Published end date moved 449 days later","In-year forecast variance is +11.3%"]},{"id":"HMRC_0031_2122-Q3","year":2026,"name":"UNITY PROGRAMME","department":"HMRC","category":"Government Transformation and Service Delivery","description":"The Shared Service Strategy for government launched in March 2021 setting out the vision to transform Shared Services across the civil service improving end users experience. To achieve this 5 clusters have been formed across the civil service. HM Revenue & Customs (HMRC), Department for Transport (DfT) and Ministry of Housing, Communities and Local Government (MHCLG) collectively make up the Unity Programme. The Unity Vision is to transform HR, Finance and Procurement across HMRC, DfT and MHCLG groups, creating a unified shared service which is user centric, swift and cost effective. Our colleagues will be empowered through intuitive, streamlined and automated processes, improving their experience and enabling everyone to spend more time delivering essential services for the public.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Delivery confidence is improving. Since 2024/25, issues have emerged in planning, governance and delivery control, which have affected pace and confidence. The programme has now put in place a revised delivery approach and strengthened governance, with a clearer plan and leadership model to stabilise delivery. These actions are focused on restoring control and improving delivery confidence over the coming year.","startDate":"2021-02-01","endDate":"2028-04-30","scheduleNarrative":"Compared to financial year 24/25 Q4, the project's end-date at 25/26 Q4 increased from 31/12/2027 to 30/04/2028. This is primarily due to the following factors: There has been slower progress in development and delivery across projects than anticipated. There are also issues with current resourcing levels to achieve delivery timelines. Detailed replanning is underway to bring confidence to milestone delivery and Go Live dates.","fyBaseline":66.79,"fyForecast":66.98,"fyVariance":0.29,"varianceNarrative":"The budget variance is less than 5%","wholeLifeCost":245.97,"costNarrative":"Compared to financial year 24/25 Q4, the programme's departmentally agreed Whole Life Cost at 25/26 Q4 (measured in £m) remained at 259. However, it is anticipated that the movement of delivery timelines to the right, and addressing the under resourcing of the programme will result in the need for additional funds to complete the programme. This will be quantified in the next version of the Business Case being submitted late summer 2026.","benefits":33.7,"benefitsNarrative":"Compared to financial year 24/25 Q4, the programme's departmentally agreed Benefits at 25/26 Q4 (measured in £m) remained at £33M.","themes":["Delivery & schedule","Cost & funding","Governance & assurance","Workforce & capability"],"evidenceExcerpt":"Delivery confidence is improving. Since 2024/25, issues have emerged in planning, governance and delivery control, which have affected pace and confidence. The programme has now put in place a revised delivery approach and strengthened governance, with a clearer plan and leadership model to stabilise delivery. These actions are focused on restoring control…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25 Q4, the project's end-date at 25/26 Q4 increased from 31/12/2027 to 30/04/2028. This is primarily due to the following factors: There has been slower progress in development and delivery across projects than anticipated. There are also issues with current resourcing levels to achieve delivery timelines. Detailed replanning is underway to bring confidence to milestone delivery and Go Live dates.","narrativeClaimKind":null,"history":[{"id":"HMRC_0031_2122-Q3","year":2022,"name":"GSS HMRC Led Cluster Programme","department":"HMRC","category":"Government Transformation and Service Delivery","description":"The Cabinet Office aims to drive greater efficiency and effectiveness in the delivery of corporate services by taking a cross-government approach, allowing for greater interoperability across the Civil Service, thereby delivering better outcomes. HM Revenue & Customs (HMRC), Department for Transport (DfT) and Department for Levelling Up, Housing and Communities (DLUHC) collectively are the GSS HMRC Led Cluster Programme working with Government Business Services (GBS) to address the Cabinet Office aims.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 is Red The overall delivery confidence is set at Red because at this stage there is no certainty as to whether the programme will be funded. Discussions in relation to funding are continuing with the Cabinet Office and HM Treasury.","startDate":"2021-02-01","endDate":"2026-12-31","scheduleNarrative":"Your project end-date is 31 DEC 2026. This is primarily due to the following factors: Our current planning assumption is that we will complete the programme and stand-up the full HMRC led Shared Service function (People and systems) by end of 2026, in line with the Shared Services for Government Strategy.","fyBaseline":1.12,"fyForecast":1.12,"fyVariance":0.0,"varianceNarrative":"The budget variance is inferior or equal to 5%.","wholeLifeCost":145.0,"costNarrative":"Your projects Baseline Whole Life Cost is 144.54 (£m). This is primarily due to the following factors: The Whole Life Costs of the Programme are made up of IT solution implementation costs, costs to create the Shared Service (people, transition and business change etc), cost of the programme team and Subject Matter Experts to deliver programme, commercial, and delivery partner costs.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 is Red The overall delivery confidence is set at Red because at this stage there is no certainty as to whether the programme will be funded. Discussions in relation to funding are continuing with the Cabinet Office and HM Treasury. Your project end-date is 31 DEC 2026.…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Your project end-date is 31 DEC 2026. This is primarily due to the following factors: Our current planning assumption is that we will complete the programme and stand-up the full HMRC led Shared Service function (People and systems) by end of 2026, in line with the Shared Services for Government Strategy.","narrativeClaimKind":null},{"id":"HMRC_0031_2122-Q3","year":2023,"name":"Unity Programme","department":"HMRC","category":"Government Transformation and Service Delivery","description":"The shared service strategy for government launched in March 2021 setting out the vision to transform Shared Services across the Civil Service improving end users experience. To achieve this 5 clusters have been formed across the civil service. HM Revenue & Customs (HMRC), Department for Transport (DfT) and Department for Levelling Up, Housing and Communities (DLUHC) collectively make upthe Unity Programme. The Unity Vision is to transform HR, Finance and Procurement across HMRC, DfT and DLUHC groups, creating a unified shared service which is user centric, swift and cost effective. Our colleagues will be empowered through intuitive, streamlined and automated processes, improving their experience and enabling everyone to spend more time delivering essential servicesfor the public.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Red. This is primarily due to the following factors. The quarterly assessment has changed to red for this quarter. This recognises that the Programme has a number of key design decisions outstanding, which all three departments must agree, in order to remain on our critical path to stand up shared services for HMRC and Department for Transport in June. The programme also lacks a number of critical skills and dedicated resources, which further puts progress at risk. The programme has been working with its delivery partner to create a critical decision path and a back to amber plan which has been agreed with the Programme Board. The programme will be focusing on this plan over the next quarter, to get key decisions agreed, key resources in place and build stakeholder confidence in the plans in advance of moving into the delivery phase. The lifecycle RAG is deemed amber as we can deliver against end lifecycle outcome.","startDate":"2021-02-01","endDate":"2026-12-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2026-12-31. This is primarily due to the following factors. Our current planning assumption is that we will complete the programme and stand up the full HMRC led shared service function (people and systems) by the end of 2026 for HMRC and Department for Transport, with Department for Levelling up Housing and Communities joining in 2026/27. This is in line with the shared services strategy for government.","fyBaseline":26.09,"fyForecast":17.46,"fyVariance":-33.0,"varianceNarrative":"Programme costs were significantly lower than originally forecast in 22/23. The Outline Business Case was not approved until November 2023, which was much later than anticipated and meant that the delivery phases of the programme were pushed back. The Technology Delivery Partner was therefore appointed in Q4, later than originally planned, the programme team was not ramped up until Q4 and the next version of the business case pushed into 23/24 which meant that the original plans to spend 3.3m on a Technology Delivery Partner in 22/23 did not materialise.","wholeLifeCost":214.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 increased from 145m. to 214m. This is primarily due to the following factors. The project's departmentally-agreed Whole Life Cost at 22/23-Q4 is 214m. This is due to: The Whole Life Costs of the Programme are made up of IT solution implementation costs, costs to create the Shared Service (people, transition and business change etc), cost of the programme team and Subject Matter Experts to deliver programme, commercial, and delivery partner costs. The Programme's previous GMPP returns reported costs until 25/26 , this now reflects Whole Life Cost up until 31/32.","benefits":43.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 43m. The project's departmentally-agreed monetised benefits at 22/23-Q4 is 42.576m. This is due to: The Programme is forecasting 42.58m sustainable efficiencies over the life cycle, with cumulative efficiencies of 238.72m. This is an increase in cumulative savings of 8.65m due to increased IT savings (0.38m) and staff productivity (19.6m), offset by a reduction in headcount savings (18.65m) due to the revised delivery timeline at our outline business case delaying benefit realisation to 2024/25. All assumptions are being revalidated in our preparation of the programme business case in Q1 23/24.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Technical & integration"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Red. This is primarily due to the following factors. The quarterly assessment has changed to red for this quarter. This recognises that the Programme has a number of key design decisions outstanding, which all three…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2026-12-31. This is primarily due to the following factors. Our current planning assumption is that we will complete the programme and stand up the full HMRC led shared service function (people and systems) by the end of 2026 for HMRC and Department for Transport, with Department for Levelling up Housing and Communities joining in 2026/27. This is in line with the shared services strategy for government.","narrativeClaimKind":null},{"id":"HMRC_0031_2122-Q3","year":2024,"name":"Unity Programme","department":"HMRC","category":"Government Transformation and Service Delivery","description":"","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 decreased from Red to Amber. This is primarily due to the following factors. The Programme remains amber. We have moved into delivery phase of the programme and have made significant progress in procuring our technology delivery partner and software provider. We have moved into formal implementation for June 24 (when DfT legacy shared services, and people move to HMRC Unity Business Services). _x000D_ Unity Business Services is now established in HMRC and Unity Technical Services (supporting services through the programme and beyond). We will continue to work to embed and evolve services as we deliver. We continue building programme delivery capability. We have renewed engagement with our programme delivery partner, appointed a senior delivery lead and have started recruitment for a new programme director. Next year (2024-25) remains a key delivery year for the programme. Although there are challenges ahead, we are positioned for success.","startDate":"2021-02-01","endDate":"2027-03-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 increased from 2026-12-31 to 2027-03-31. This is primarily due to the following factors. Our current planning assumption is that we will complete the programme and stand up the full HMRC led shared service function (people and systems) by the end of 2026 for HMRC and Department for Transport, with Department for Levelling up Housing and Communities joining in 2026/27. This is in line with the shared services strategy for government.","fyBaseline":23.8,"fyForecast":23.8,"fyVariance":0.0,"varianceNarrative":"The budget variance is inferior or equal to 5%.","wholeLifeCost":437.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 increased from 214m. to 437m. This is primarily due to the following factors. The programme's previous GMPP annual return reported outline costs covering an 11-year period. The next iteration includes enhanced cost information and covers a period of 15 years to align with other clusters as requested by Cabinet Office.","benefits":38.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 2324-Q4 decreased from 43m. to 38m. The Programme is forecasting 42.58m sustainable efficiencies over the life cycle, with cumulative efficiencies of 238.72m. This is an increase in cumulative savings of 8.65m due to increased IT savings (0.38m) and staff productivity (19.6m), offset by a reduction in headcount savings (18.65m) due to the revised delivery timeline delaying benefit realisation to 2024/25.","themes":["Delivery & schedule","Cost & funding","Technical & integration","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 decreased from Red to Amber. This is primarily due to the following factors. The Programme remains amber. We have moved into delivery phase of the programme and have made significant progress in procuring our technology delivery…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 increased from 2026-12-31 to 2027-03-31. This is primarily due to the following factors. Our current planning assumption is that we will complete the programme and stand up the full HMRC led shared service function (people and systems) by the end of 2026 for HMRC and Department for Transport, with Department for Levelling up Housing and Communities joining in 2026/27. This is in line with the shared services strategy for government.","narrativeClaimKind":null},{"id":"HMRC_0031_2122-Q3","year":2025,"name":"UNITY PROGRAMME","department":"HMRC","category":"Government Transformation and Service Delivery","description":"The Shared Service Strategy for government launched in March 2021 setting out the vision to transform Shared Services across the civil service improving end users experience. To achieve this, five clusters have been formed across the civil service. HM Revenue & Customs (HMRC), Department for Transport (DfT) and Ministry of Housing, Communities and Local Government (MHCLG) collectively make up the Unity Programme. The aim for Unity is to transform HR, Finance and Procurement across HMRC, DfT and MHCLG groups, create a unified shared service for transactional activity which is user centric, swift and cost effective, and through deployment of modern technologies, transform the corporate offer within each department. Our colleagues will be empowered through intuitive, streamlined and automated processes, improving their experience and enabling everyone to spend more time delivering essential services for the public. This programme supports both the Prime Minister's plans for a Productive and Agile State and the delivery of Departmental efficiency targets.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The Programme remains amber. We have moved into delivery phase of the programme and have made significant progress in 24/25 through transitioning DfT legacy shared services, and people to HMRC Unity Business Services in June 24, and onboarding of our technology delivery partner (Deloitte) and software provider (SAP) in November 2024. This has enabled us to mobilise our delivery projects, complete discovery work and start detailed design. Over the last year we have focused on building capability for the next stage, mitigating risks to support delivery and build strong, trusted relationships across our stakeholders and partners. We have appointed a new Programme Director, as well as Process and User Experience and Workforce design leads. In 2025-26 we will complete detailed design and build testing ahead of deployment of our first key projects of HR and Payroll. Although there are challenges ahead, we are well positioned for success.","startDate":"2021-02-01","endDate":"2027-12-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2027 to 31/12/2027. This is primarily due to the following factors: Our current planning assumption is that we will complete the programme and stand up the full HMRC led shared service function (people and systems) by the end of Q1 27/28 for HMRC and Department for Transport, with MHCLG and Maritime and Coastguard Agency (MCA) joining in late 2027. This is in line with the shared services strategy for government and reflects a reasonable period for transition and hypercare.","fyBaseline":44.02,"fyForecast":35.91,"fyVariance":18.42,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ This variance has primarily been due to the delay in approvals to sign the contract with Technical Delivery Partner and software supplier by approximately 2.5 months. This meant the Supplier spend was not incurred for this period and, similarly, the programme recognised the movement in it's delivery timescale and re-aligned it's workforce recruitment accordingly, thereby also moving all of the aforementioned additional costs into the next financial year (this is a cost movement rather than a cost reduction).","wholeLifeCost":259.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 437 to 259. This is primarily due to the following factors‚ In the second iteration of the Unity Programme Business Case (PBC) approved by Chief Secretary to the Treasury (CST) in October 2024, whole-life costs reduced from £437m (approved Oct 23) to £259m. The reductions primarily relate to negotiations of actual cost of licences and system integration following a lengthy procurement process, certainty around cost of transformation and increased maturity of programme delivery.","benefits":33.7,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) decreased from 38 to 33. This is primarily due to the following factors‚ The variance reflects updated Programme Business Case which was subsequently approved. The costs had been updated following more mature knowledge and awareness of the cost estimation.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Technical & integration"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The Programme remains amber. We have moved into delivery phase of the programme and have made significant progress in 24/25 through transitioning DfT legacy shared…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2027 to 31/12/2027. This is primarily due to the following factors: Our current planning assumption is that we will complete the programme and stand up the full HMRC led shared service function (people and systems) by the end of Q1 27/28 for HMRC and Department for Transport, with MHCLG and Maritime and Coastguard Agency (MCA) joining in late 2027. This is in line with the shared services strategy for government and reflects a reasonable period for transition and hypercare.","narrativeClaimKind":null},{"id":"HMRC_0031_2122-Q3","year":2026,"name":"UNITY PROGRAMME","department":"HMRC","category":"Government Transformation and Service Delivery","description":"The Shared Service Strategy for government launched in March 2021 setting out the vision to transform Shared Services across the civil service improving end users experience. To achieve this 5 clusters have been formed across the civil service. HM Revenue & Customs (HMRC), Department for Transport (DfT) and Ministry of Housing, Communities and Local Government (MHCLG) collectively make up the Unity Programme. The Unity Vision is to transform HR, Finance and Procurement across HMRC, DfT and MHCLG groups, creating a unified shared service which is user centric, swift and cost effective. Our colleagues will be empowered through intuitive, streamlined and automated processes, improving their experience and enabling everyone to spend more time delivering essential services for the public.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Delivery confidence is improving. Since 2024/25, issues have emerged in planning, governance and delivery control, which have affected pace and confidence. The programme has now put in place a revised delivery approach and strengthened governance, with a clearer plan and leadership model to stabilise delivery. These actions are focused on restoring control and improving delivery confidence over the coming year.","startDate":"2021-02-01","endDate":"2028-04-30","scheduleNarrative":"Compared to financial year 24/25 Q4, the project's end-date at 25/26 Q4 increased from 31/12/2027 to 30/04/2028. This is primarily due to the following factors: There has been slower progress in development and delivery across projects than anticipated. There are also issues with current resourcing levels to achieve delivery timelines. Detailed replanning is underway to bring confidence to milestone delivery and Go Live dates.","fyBaseline":66.79,"fyForecast":66.98,"fyVariance":0.29,"varianceNarrative":"The budget variance is less than 5%","wholeLifeCost":245.97,"costNarrative":"Compared to financial year 24/25 Q4, the programme's departmentally agreed Whole Life Cost at 25/26 Q4 (measured in £m) remained at 259. However, it is anticipated that the movement of delivery timelines to the right, and addressing the under resourcing of the programme will result in the need for additional funds to complete the programme. This will be quantified in the next version of the Business Case being submitted late summer 2026.","benefits":33.7,"benefitsNarrative":"Compared to financial year 24/25 Q4, the programme's departmentally agreed Benefits at 25/26 Q4 (measured in £m) remained at £33M.","themes":["Delivery & schedule","Cost & funding","Governance & assurance","Workforce & capability"],"evidenceExcerpt":"Delivery confidence is improving. Since 2024/25, issues have emerged in planning, governance and delivery control, which have affected pace and confidence. The programme has now put in place a revised delivery approach and strengthened governance, with a clearer plan and leadership model to stabilise delivery. These actions are focused on restoring control…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25 Q4, the project's end-date at 25/26 Q4 increased from 31/12/2027 to 30/04/2028. This is primarily due to the following factors: There has been slower progress in development and delivery across projects than anticipated. There are also issues with current resourcing levels to achieve delivery timelines. Detailed replanning is underway to bring confidence to milestone delivery and Go Live dates.","narrativeClaimKind":null}],"previous":{"id":"HMRC_0031_2122-Q3","year":2025,"name":"UNITY PROGRAMME","department":"HMRC","category":"Government Transformation and Service Delivery","description":"The Shared Service Strategy for government launched in March 2021 setting out the vision to transform Shared Services across the civil service improving end users experience. To achieve this, five clusters have been formed across the civil service. HM Revenue & Customs (HMRC), Department for Transport (DfT) and Ministry of Housing, Communities and Local Government (MHCLG) collectively make up the Unity Programme. The aim for Unity is to transform HR, Finance and Procurement across HMRC, DfT and MHCLG groups, create a unified shared service for transactional activity which is user centric, swift and cost effective, and through deployment of modern technologies, transform the corporate offer within each department. Our colleagues will be empowered through intuitive, streamlined and automated processes, improving their experience and enabling everyone to spend more time delivering essential services for the public. This programme supports both the Prime Minister's plans for a Productive and Agile State and the delivery of Departmental efficiency targets.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The Programme remains amber. We have moved into delivery phase of the programme and have made significant progress in 24/25 through transitioning DfT legacy shared services, and people to HMRC Unity Business Services in June 24, and onboarding of our technology delivery partner (Deloitte) and software provider (SAP) in November 2024. This has enabled us to mobilise our delivery projects, complete discovery work and start detailed design. Over the last year we have focused on building capability for the next stage, mitigating risks to support delivery and build strong, trusted relationships across our stakeholders and partners. We have appointed a new Programme Director, as well as Process and User Experience and Workforce design leads. In 2025-26 we will complete detailed design and build testing ahead of deployment of our first key projects of HR and Payroll. Although there are challenges ahead, we are well positioned for success.","startDate":"2021-02-01","endDate":"2027-12-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2027 to 31/12/2027. This is primarily due to the following factors: Our current planning assumption is that we will complete the programme and stand up the full HMRC led shared service function (people and systems) by the end of Q1 27/28 for HMRC and Department for Transport, with MHCLG and Maritime and Coastguard Agency (MCA) joining in late 2027. This is in line with the shared services strategy for government and reflects a reasonable period for transition and hypercare.","fyBaseline":44.02,"fyForecast":35.91,"fyVariance":18.42,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ This variance has primarily been due to the delay in approvals to sign the contract with Technical Delivery Partner and software supplier by approximately 2.5 months. This meant the Supplier spend was not incurred for this period and, similarly, the programme recognised the movement in it's delivery timescale and re-aligned it's workforce recruitment accordingly, thereby also moving all of the aforementioned additional costs into the next financial year (this is a cost movement rather than a cost reduction).","wholeLifeCost":259.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 437 to 259. This is primarily due to the following factors‚ In the second iteration of the Unity Programme Business Case (PBC) approved by Chief Secretary to the Treasury (CST) in October 2024, whole-life costs reduced from £437m (approved Oct 23) to £259m. The reductions primarily relate to negotiations of actual cost of licences and system integration following a lengthy procurement process, certainty around cost of transformation and increased maturity of programme delivery.","benefits":33.7,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) decreased from 38 to 33. This is primarily due to the following factors‚ The variance reflects updated Programme Business Case which was subsequently approved. The costs had been updated following more mature knowledge and awareness of the cost estimation.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Technical & integration"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The Programme remains amber. We have moved into delivery phase of the programme and have made significant progress in 24/25 through transitioning DfT legacy shared…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2027 to 31/12/2027. This is primarily due to the following factors: Our current planning assumption is that we will complete the programme and stand up the full HMRC led shared service function (people and systems) by the end of Q1 27/28 for HMRC and Department for Transport, with MHCLG and Maritime and Coastguard Agency (MCA) joining in late 2027. This is in line with the shared services strategy for government and reflects a reasonable period for transition and hypercare.","narrativeClaimKind":null},"ratingDelta":1,"transition":"Worsened","endDateDeltaDays":121,"attentionScore":67,"attentionReasons":["Current published delivery confidence is Red","Published rating worsened from Amber to Red","Published end date moved 121 days later"]},{"id":"DFT_0038_1920-Q4","year":2026,"name":"EAST COAST DIGITAL PROGRAMME","department":"DFT","category":"Infrastructure and Construction","description":"The East Coast Digital Programme (ECDP) will implement the European Train Control System (ETCS) on 100 miles of the East Coast Mainline (ECML) between Kings Cross and Stoke Tunnel just south of Grantham, as well as on the Northern City Line (NCL) between Moorgate and Finsbury Park. The ECDP is the UK’s first implementation of ETCS on a mixed-use (freight and passenger trains) UK mainline route and will involve a major change in working practices for the rail industry. ETCS communicates signalling information into the driver’s cab in real-time, constantly updating how far ahead the train is authorised to move and providing optimal speed information. It removes the need for conventional lineside ‘traffic light’ signals, allowing for less-disruptive installation and maintenance. As well as having a lower whole life cost than conventional signals, ETCS on the NCL and the ECML will enhance operational resilience, is safer for passengers and rail workers, and has a 40% reduction in whole-life CO2 emissions through reduced use of materials compared to conventional signalling. ETCS also has the potential to unlock significant passenger and freight benefits through delivering an improvement in system capability of between 10 and 25%.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25-Q4, the National Infrastructure & Service Transformation Authority's Delivery Confidence Assessment rating at 25/26-Q4 is at RED. The NISTA review team noted that the partnership model continues to be the correct approach, and there have been positive changes in programme leadership. The review team highlighted that there is a need to re-baseline the programme, and that the programme is complex with several risks to delivery. They raised 19 recommendations to address. Recommendations include in the areas of ETCS freight train retrofitment, clearer accountabilities of leadership, and to continue the early identification of emerging risks to delivery.","startDate":"2017-05-01","endDate":"2030-10-14","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's baselined end-date at 25/26-Q4 remained at 14/10/2030. This date will be subject to a rebaseline exercise during 2026. The ECDP’s schedule has been set up to deliver ETCS on the ECML in a phased migration. The full migration to ETCS operations on the Northern City Line with the removal of conventional signals was achieved as planned in May 2025. In FY25/26, activities have focused on enabling works for the ETCS section on the ECML between Welwyn to Hitchin to provide a driver training area, due to enter into service August 2026. Works have included vehicle fitment, on-track testing and systems assurance. This milestone forecast has moved from December 2025 to August 2026, due to encountering challenges around system testing and assurance that will provide lessons for future ETCS schemes. The first mainline route section, originally due April 2027, is subject to change control as part of the rebaseline exercise.","fyBaseline":231.12,"fyForecast":194.42,"fyVariance":15.88,"varianceNarrative":"The budget variance exceeds 5%. This underspend is due to delays in contract awards and ETCS vehicle retrofitments, and less money has been spent on works for the renewals portion of ECDP (ie beyond Welwyn to Hitchin).","wholeLifeCost":3030.39,"costNarrative":"Compared to financial year 24/25-Q4, the programme's Whole Life Cost at 25/26-Q4 increased from £3,465m to £3,764m (in Nominal Prices). The programme anticipates that inflation will materialise as a key issue in the later years of the programme. As we move into the 2026-27 reporting cycle, the key risk to maintaining overall programme cost will be the cost of vehicle fitment and ETCS trackside infrastructure on the ECML. The programme is actively looking at how these costs can be managed whilst protecting the programme’s benefits. While delivery continues, ECDP is also maturing its delivery model to ensure it remains the enabler for future ETCS schemes.","benefits":1430.67,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed benefits at 25/26 Q4 remained at £2,783m (In Nominal £ Benefits). Benefits will be subject to a refresh during 2026. The benefits figure includes quantified performance, safety, socio-economic, environmental and wider economic monetised benefits.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 24/25-Q4, the National Infrastructure & Service Transformation Authority's Delivery Confidence Assessment rating at 25/26-Q4 is at RED. The NISTA review team noted that the partnership model continues to be the correct approach, and there have been positive changes in programme leadership. The review team highlighted that there is…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's baselined end-date at 25/26-Q4 remained at 14/10/2030. This date will be subject to a rebaseline exercise during 2026. The ECDP’s schedule has been set up to deliver ETCS on the ECML in a phased migration. The full migration to ETCS operations on the Northern City Line with the removal of conventional signals was achieved as planned in May 2025. In FY25/26, activities have focused on enabling works for the ETCS section on the ECML between Welwyn to Hitchin to provide a driver training area, due to enter into service August 2026. Works have included vehicle fitment, on-track testing and systems assurance. This milestone forecast has moved from December 2025 to August 2026, due to encountering challenges around system testing and assurance that will provide lessons for future ETCS schemes. The first mainline route section, originally due April 2027, is subject to change control as part of the rebaseline exercise.","narrativeClaimKind":null,"history":[{"id":"DFT_0038_1920-Q4","year":2021,"name":"East Coast Digital Programme","department":"DFT","category":"Infrastructure and Construction","description":"The programme is seeking to bring about transformation through the introduction of digital technologies such as the European Train Control System; replacing conventional signalling with digital signalling on the East Coast Mainline South. This is the first mainline deployment of digital signalling and a critical pathfinder in the strategy to roll-out this technology across the whole rail network to provide a range of benefits such as increasing performance and lowering whole life costs.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber.This is primarily due to the following factors: The Department has a plan in place to address the resourcing issue and increase overall resourcing as the programme moves towards Full Business Case (FBC) submission and delivery. As the FBC is finalised, this will provide greater clarity about the migration strategy and costs and risks associated with the programme which will provide assurance on the programme schedule. Additionally, early works on the Northern City Line will test the programme partnership approach. The Department is working closely with Network Rail to ensure that the national enabler projects meet the requirements of the programme critical path. These will give us greater confidence in the deliverability of this programme.","startDate":"2017-05-01","endDate":"2029-12-31","scheduleNarrative":"The project end-date is 31 December 2029. This is primarily due to the following factors: This is a challenging project to retrofit digital signalling control systems to a highspeed mixed use line with a number of complex interfaces. Network Rail are taking forward this programme in a new way including through its approach to procurement and the establishment of a cross-industry board. Train fitment was deliberately started early to expose risks and challenges so that they can be tackled in time. Significant risks and challenges do remain, such as the national enabler projects. The Department, Network Rail and suppliers are working to resolve these so that they do not impact on the delivery of the programme. The planned schedule has been confirmed and is undergoing the proper assurance process as we finalise FBC. At this stage, we are confident that the programme partnership model and early industry engagement has delivered tangible results and, with the programme float reinstated, the programme can deliver to time and budget.","fyBaseline":120.52,"fyForecast":61.91,"fyVariance":-49.0,"varianceNarrative":"The budget variance exceeds 5%. At Outline Business Case (OBC), the First in Class Freight Fitment programme and the Rail Innovation & Development Centre project, which are enabler projects, were included in programme life costs. They have since been reprofiled and are now reported through Network Rail's Digital Railway programme, meaning they are not included in the forecast estimate. The variance also reflects some movement in infrastructure costs between years and increasing certainty in cost category expenditure amounts. Costs will become even more certain as the programme progresses to FBC and will be adjusted to reflect external funding pressures eg. Spending Review.","wholeLifeCost":2403.29,"costNarrative":"The projects Baseline Whole Life Cost is �2403.29m. This is primarily due to the following factors: The overall total Whole Life Cost (including inflation) between Control Period 6 (CP6) and Control Period 12 (CP12) for the East Coast Digital Programme is estimated to be between �2.98bn and �3.45bn in nominal figure including optimism bias. CP6/7 costs are estimated to be in the range of �1.2 - 1.9bn. These figures have been taken from the OBC Business Case. The forecast will be confirmed and refreshed at FBC.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Technical & integration"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber.This is primarily due to the following factors: The Department has a plan in place to address the resourcing issue and increase overall resourcing as the programme moves towards Full Business Case (FBC) submission and delivery. As the FBC is finalised, this will provide…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project end-date is 31 December 2029. This is primarily due to the following factors: This is a challenging project to retrofit digital signalling control systems to a highspeed mixed use line with a number of complex interfaces. Network Rail are taking forward this programme in a new way including through its approach to procurement and the establishment of a cross-industry board. Train fitment was deliberately started early to expose risks and challenges so that they can be tackled in time. Significant risks and challenges do remain, such as the national enabler projects. The Department, Network Rail and suppliers are working to resolve these so that they do not impact on the delivery of the programme. The planned schedule has been confirmed and is undergoing the proper assurance process as we finalise FBC. At this stage, we are confident that the programme partnership model and early industry engagement has delivered tangible results and, with the programme float reinstated, the programme can deliver to time and budget.","narrativeClaimKind":null},{"id":"DFT_0038_1920-Q4","year":2022,"name":"East Coast Digital Programme","department":"DFT","category":"Infrastructure and Construction","description":"The East Coast Digital Programme will deliver improvements in railway operation through the introduction of European Train Control System technology on the East Coast Main Line. This digital signalling technology will replace expired conventional signalling infrastructure between Kings Cross and Stoke Tunnel south of Grantham. Digital signalling has a lower whole-life cost than conventional signalling and offers performance and capacity benefits to users not available through conventional line-side signalling.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 remained at Amber. Concerns still remain on issues related to fitment of European Train Control System (ETCS) technology on-board freight rolling stock and the development of the Rail Innovation & Development Centre (RIDC). Both are innovative and complex engineering challenges for the programme to overcome, resulting in the Amber rating. In the last quarter inflation risk to the programme has rapidly increased. The Programme is working with colleagues across DfT and Network Rail to develop a consistent approach to managing inflation risk, in recognition that it is not unique to the East Coast Digital Programme (ECDP). Following the Programme receiving a GREEN rating from the IPA at its Gateway 3 Review in October 2021 the Programme has addressed several recommendations and concerns in the report. This includes increasing resource levels on the Programme to fill all vacancies and the confirmation of freight commercial agreements with suppliers.","startDate":"2017-05-01","endDate":"2030-10-14","scheduleNarrative":"Compared to 2021-Q4, your project end-date increased from 31 DEC 2029 to 14 OCT 2030 . This is primarily due to the following factors: The 2021 Q4 project end-date was taken from the Programme's OBC. Since that time the Programme has developed and had its FBC approved in March 2022. The new project end date is at P80 confidence level and based on a greater understanding of Programme actions and requirements than at OBC. This is the project end date agreed in our Client Remit Letter with Network Rail.","fyBaseline":109.9,"fyForecast":109.9,"fyVariance":0.0,"varianceNarrative":"The GMPP project did not provide data","wholeLifeCost":3477.0,"costNarrative":"Compared to2021-Q4, the projects Baseline Whole Life Cost increased from 2403.29 (£m) to 3476.66 (£m). This is primarily due to the following factors: The 2021 Q4 baseline whole life cost was based on a range of figures given at OBC. The figures this quarter are FBC figures, but remain within the range given at OBC (£2.98-3.4bn). The FBC figures are more mature and reflect greater certainty of Programme costs compared to the OBC, with costs being based on contract values or quotes from industry.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Commercial & supply chain","Technical & integration","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 remained at Amber. Concerns still remain on issues related to fitment of European Train Control System (ETCS) technology on-board freight rolling stock and the development of the Rail Innovation & Development Centre (RIDC). Both are…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to 2021-Q4, your project end-date increased from 31 DEC 2029 to 14 OCT 2030 . This is primarily due to the following factors: The 2021 Q4 project end-date was taken from the Programme's OBC. Since that time the Programme has developed and had its FBC approved in March 2022. The new project end date is at P80 confidence level and based on a greater understanding of Programme actions and requirements than at OBC. This is the project end date agreed in our Client Remit Letter with Network Rail.","narrativeClaimKind":null},{"id":"DFT_0038_1920-Q4","year":2023,"name":"East Coast Digital Programme","department":"DFT","category":"Infrastructure and Construction","description":"The East Coast Digital Programme will introduce European Train Control System signalling technology to the East Coast Mainline southern section between Kings Cross & Stoke Tunnel just south of Grantham. This will involve the removal of conventional line-side traffic light signals and their replacement with digital signalling which will display safety information in the drivers cab. This is the first implementation of this technology on a UK mainline route, and will provide drivers with more information through the continuous communication between the train and track, allowing for greater safety and reliability.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber (SRO rating). This is primarily due to the following factors. The programme received an AMBER RAG rating at its annual Gateway 0 review held in September 2022. The review team recognised the unique and challenging nature of the programme and highlighted several key risks to delivery broadly focused on freight fitment, risk management and industrial relations. To support the successful delivery of the programme the review team provided 13 recommendations for ECDP to implement ahead of the next planned review in September 2023. Since the review 8 of the 13 recommendations have been implemented on the programme with a clear plan for the delivery of the remaining 5 ahead of the next review. Outstanding actions include the signature of freight business change agreements, launch of a programme intranet and marketing campaign, the holding of the annual QCRA risk review, publication of a refreshed programme mandate and an update to the programme benefits strategy. All 5 of these actions have an assigned owner and are tracked and reported on with an escalation route to the SRO.","startDate":"2017-05-01","endDate":"2030-10-14","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2030-10-14. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2030-10-14. This is primarily due to the following factors. The programme remains on schedule at the end of this reporting period. Since the last annual report a number of Tier 1 milestones have been achieved by the programme. This includes the commissioning into service of the interlocking system at Moorgate on the Northern City Line as well as the successful system proving of the ETCS system on the same branch line. However, delays continue on agreeing the signature of several major contracts which is putting significant pressure on programme schedule as we move into the next reporting period. In addition, the programme faces a major challenge in securing requisite additional engineering access over the coming year to make up for lost access over the last reporting period due to industrial action outside of the programmes control. Both of these factors bring a risk that over the next year programme schedule may move to reflect the delay to agreeing these contracts.","fyBaseline":222.0,"fyForecast":232.0,"fyVariance":5.0,"varianceNarrative":"The GMPP project did not provide data","wholeLifeCost":3477.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 remained at 3477m. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 remained at 3477m. This is primarily due to the following factors. At the end of the reporting period, programme who life costs have remained stable over the last year. Despite inflation remaining a key risk to the programme this has not yet materialised into higher whole life costs. However, as the programme moves into the next reporting period there remains a risk that cost will increase due to the challenge of securing sufficient engineering access to make up for delays caused by industrial action over the last year. Mitigations are being prepared by the programme, but the risk remains that this will cause significant additional cost to the programme.","benefits":826.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 826m. The programmes benefits profile has remained static compared to last reporting period. As the benefits of digital signalling start to materialise on the Northern City Line, the first area to transition to ETCS, the programme will begin monitoring there accrual in earnest over the coming year. To note, the monetised benefits figure is the discounted Net Present Benefit as set out in the FBC, and therefore not comparable to the Nominal whole life costs. This will be updated in the Q2 submission to IPA.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Technical & integration"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber (SRO rating). This is primarily due to the following factors. The programme received an AMBER RAG rating at its annual Gateway 0 review held in September 2022. The review team recognised the unique and challenging nature of the programme and…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2030-10-14. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2030-10-14. This is primarily due to the following factors. The programme remains on schedule at the end of this reporting period. Since the last annual report a number of Tier 1 milestones have been achieved by the programme. This includes the commissioning into service of the interlocking system at Moorgate on the Northern City Line as well as the successful system proving of the ETCS system on the same branch line. However, delays continue on agreeing the signature of several major contracts which is putting significant pressure on programme schedule as we move into the next reporting period. In addition, the programme faces a major challenge in securing requisite additional engineering access over the coming year to make up for lost access over the last reporting period due to industrial action outside of the programmes control. Both of these factors bring a risk that over the next year programme schedule may move to reflect the delay to agreeing these contracts.","narrativeClaimKind":null},{"id":"DFT_0038_1920-Q4","year":2024,"name":"East Coast Digital Programme","department":"DFT","category":"Infrastructure and Construction","description":"The East Coast Digital Programme will introduce European Train Control System signalling technology, also known as digital signalling, to the East Coast Mainline southern section between Kings Cross & Stoke Tunnel just south of Grantham. This will involve the removal of conventional line-side traffic light signals and their replacement with digital signalling which will display safety information in the driver's cab. _x000D_ _x000D_ As well as being cheaper on a whole-life basis, implementing the technology will provide a number of additional benefits unavailable under convention signals such as improved safety and efficiency as it provides drivers with more information through the continuous communication between the train and track. This is the first implementation of this technology on a UK mainline route and as well as being a significant engineering challenge, it will also involve a major change in working practices for industry.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The programme received an AMBER rating at its annual review held in September 2023. The reviewers praised the unique and innovative approach to delivery used on the programme and the engagement of delivery partners in its output. In addition, they also highlighted several risks to delivery which required attention by the team. This included for example improved communication with stakeholders over delivery plans and ensuring key personnel and skills are retained. In order to address these challenges the review team provided 12 recommendations for ECDP to implement ahead of the next planned review in October 2024. Since the review 8 of the 12 recommendations have been implemented on the programme with a clear plan for the delivery of the remaining 4 ahead of the next review. Notable changes delivered via these recommendations include an update to the programme delivery model, improved ED&I monitoring as well as changes to reporting.","startDate":"2017-05-01","endDate":"2030-10-14","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2030-10-14. This is primarily due to the following factors. Final programme completion remains on schedule as at the end of the reporting year. Since the last annual report a number of Tier 1 milestones have been achieved by the programme including the entry into service of the ETCS testing facility at the Rail Innovation and Development Centre where all ETCS fitted trains will be tested and the commissioning of ETCS infrastructure on the Welwyn to Hitchin Overlay Area, where conventional signals will be retained to allow the progressive training of drivers. In addition to these Tier 1 milestones, the 2023-24 reporting year also saw both the running of ETCS trains and the start of mass-driver training for the first time on the Northern City Line. However, despite overall programme completion remaining on schedule there has been delays to several intermediate milestones over this reporting year. This includes for example milestones related to vehicle fitment and infrastructure commissioning. These delays have primarily been driven by loss of access to the railway to complete infrastructure works and constraints in the supply chain","fyBaseline":352.34,"fyForecast":297.99,"fyVariance":-15.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The variance from the forecast of costs is broadly down to three factors which has moved spend into later years. Firstly, the impact of industrial action in 2022 led to delays in infrastructure delivery between Welwyn and Hitchin the first area on the mainline to have digital signalling infrastructure fitted, causing a consequential delay to the Key Outcome 1 milestone which covers the removal of signals on this stretch of line resulting in costs slipping to the right. In addition, delays to freight fitment and approvals caused by the complexity of the engineering challenge have also pushed spend to later in the programme. The final factor moving spend to the right has been delays to agreeing the contract for the fitment of the Class 80X fleet, which delayed the start of this project and hence moving costs to later in the programme lifecycle.","wholeLifeCost":3477.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 remained at 3477m. This is primarily due to the following factors. At the end of the reporting year, programme whole life costs have remained stable since the last annual report. Despite inflation remaining a key risk to the programme this has not yet materialised into higher whole life costs through use of contingency and leveraging commercial tools such as bulk purchase of materials to gain cost savings. As we move in the 2024-25 reporting cycle, the key risk to maintaining overall programme cost will be the affordability of fleet fitment within the freight and OTM sectors. The programme is actively looking at how it can reduce cost in these sectors through working with the sector.","benefits":824.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 2324-Q4 decreased from 826m. to 824m. The programme's benefits profile has remained static compared to last reporting period. As the benefits of digital signalling start to materialise on the Northern City Line, the first area to transition to ETCS, the programme will begin monitoring there accrual in earnest over the coming year. Please note that the benefits reported here are in present value at 2010 prices, whereas whole lifecycle costs are in cash prices, so are not directly comparable.","themes":["Delivery & schedule","Cost & funding","Commercial & supply chain","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The programme received an AMBER rating at its annual review held in September 2023. The reviewers praised the unique and innovative approach to delivery used on the programme…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2030-10-14. This is primarily due to the following factors. Final programme completion remains on schedule as at the end of the reporting year. Since the last annual report a number of Tier 1 milestones have been achieved by the programme including the entry into service of the ETCS testing facility at the Rail Innovation and Development Centre where all ETCS fitted trains will be tested and the commissioning of ETCS infrastructure on the Welwyn to Hitchin Overlay Area, where conventional signals will be retained to allow the progressive training of drivers. In addition to these Tier 1 milestones, the 2023-24 reporting year also saw both the running of ETCS trains and the start of mass-driver training for the first time on the Northern City Line. However, despite overall programme completion remaining on schedule there has been delays to several intermediate milestones over this reporting year. This includes for example milestones related to vehicle fitment and infrastructure commissioning. These delays have primarily been driven by loss of access to the railway to complete infrastructure works and constraints in the supply chain","narrativeClaimKind":null},{"id":"DFT_0038_1920-Q4","year":2025,"name":"EAST COAST DIGITAL PROGRAMME","department":"DfT","category":"Infrastructure and Construction","description":"The East Coast Digital Programme (ECDP) will implement the European Train Control System (ETCS) on 100 miles of the East Coast Mainline (ECML) between Kings Cross and Stoke Tunnel just south of Grantham, as well as on the Northern City Line (NCL) between Moorgate and Finsbury Park. The ECDP is the UK’s first implementation of ETCS on a mixed used UK mainline route and will involve a major change in working practices for the rail industry. ETCS communicates signalling information into the driver’s cab in real-time, constantly updating how far ahead the train is authorised to move and providing optimal speed information. It removes the need for conventional lineside ‘traffic light’ signals, allowing for less-disruptive installation and maintenance. As well as having a lower whole life cost than conventional signals, ETCS on the NCL and the ECML will enhance operational resilience, is even safer for passengers and rail workers, and has a 40% reduction in whole-life CO2 emissions. ETCS also has the potential to unlock significant passenger and freight benefits through delivering an improvement in system capability of between 10 and 25%.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The IPA review team recognised the complexity of the programme, highlighting the technical challenge and a complex stakeholder environment. It praised the programme’s overall approach to managing this complexity, highlighting the success of the programme’s partnership model and strong capability across key resources. The review team highlighted several risks to delivery and raised 17 recommendations to address this. This included ensuring the ECDP is set up optimally to manage the systems integration challenge, ensuring that the ECDP has the right governance and processes to resolve key issues, and developing the programme’s approach to retrofitting freight locomotives with ETCS. The review team’s recommendations have been accepted with clear time-bound actions identified to ensure they are addressed. Notable changes include significant updates to ECDP’s operating model, governance and management information.","startDate":"2017-05-01","endDate":"2030-10-14","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 14/10/2030. This is primarily due to the following factors‚ The ECDP’s schedule has been set up to deliver ETCS on the ECML and the NCL in a phased migration. In FY24/25, activities have focused on delivering the first phases of this migration. This includes the full migration to ETCS operation on the NCL due May 2025 (achieved), as well as the implementation of an ETCS overlay on the ECML between Welwyn to Hitchin to provide a driver training area, due December 2025. Good progress was made in these activities in FY24/25. The NCL was successfully migrated to 100% ETCS operation with the conventional “traffic light” signals removed in May 2025, a significant programme milestone. Various enabling works have also been completed for the ETCS overlay between Welwyn to Hitchin. This includes infrastructure commissioning, progressive systems assurance, vehicle fitment, and on track testing. As such, this milestone has maintained its forecast for the next financial year, although some delivery pressures have been acknowledged. The programme’s end date remains unchanged at 14/10/2030. This end date is dependent on the programme’s approach to the later migration phases. No changes to the baseline of these dates were made in FY24/25 but this is currently under review. This review seeks to assess the impact of potential changes to ECDP’s funding profile and learnings from the first phases of migration.","fyBaseline":365.2,"fyForecast":271.8,"fyVariance":25.58,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The variance from the original budget baseline is broadly down to four factors. Contract award assurance for the delivery of ETCS infrastructure between Welwyn and Hitchin led to a delay, resulting in a reduction of the forecast FY24/25 spend. Funding for the ETCS fitment of the Class 800s was transferred to the DfT from the ECDP, as DfT held the existing commercial relationships with the related train operators and suppliers. Spend for the fitment of On Track Machine’s (OTM) and associated business change activities was deferred from FY24/25 due to delays in the required contract awards. Finally, funding for the delivery of ETCS trackside infrastructure was deferred from FY24/25 due to a reduction in Network Rail’s Eastern Region funding.","wholeLifeCost":3465.4,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 3477 to 3465. This is primarily due to the following factors‚ Programme whole life costs have remained stable since the last annual report. Despite inflation remaining a key risk to the programme this has not yet materialised into higher whole life costs through use of contingency, leveraging commercial tools, and a programme wide efficiencies campaign. As we move into the 2025-26 reporting cycle, the key risk to maintaining overall programme cost will be the cost vehicle fitment and the cost of ETCS trackside infrastructure on the ECML. The programme is actively looking at how these costs can be managed whilst protecting the programme’s benefits.","benefits":2783.1,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 824 to 2783. This is primarily due to the following factors‚ The benefits reporting methodology has been revised this year to align with how costs are reported. Previously ECDP benefits have been reported in 2011 prices. This has now been replaced with the nominal value. There has been no change in the ECDP's like for like monetised benefits in the last year. The benefits figure includes quantified performance, safety, socio-economic, environmental and wider economic monetised benefits.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Technical & integration"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The IPA review team recognised the complexity of the programme, highlighting the technical challenge and a complex stakeholder environment. It praised the programme’s…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 14/10/2030. This is primarily due to the following factors‚ The ECDP’s schedule has been set up to deliver ETCS on the ECML and the NCL in a phased migration. In FY24/25, activities have focused on delivering the first phases of this migration. This includes the full migration to ETCS operation on the NCL due May 2025 (achieved), as well as the implementation of an ETCS overlay on the ECML between Welwyn to Hitchin to provide a driver training area, due December 2025. Good progress was made in these activities in FY24/25. The NCL was successfully migrated to 100% ETCS operation with the conventional “traffic light” signals removed in May 2025, a significant programme milestone. Various enabling works have also been completed for the ETCS overlay between Welwyn to Hitchin. This includes infrastructure commissioning, progressive systems assurance, vehicle fitment, and on track testing. As such, this milestone has maintained its forecast for the next financial year, although some delivery pressures have been acknowledged. The programme’s end date remains unchanged at 14/10/2030. This end date is dependent on the programme’s approach to the later migration phases. No changes to the baseline of these dates were made in FY24/25 but this is currently under review. This review seeks to assess the impact of potential changes to ECDP’s funding profile and learnings from the first phases of migration.","narrativeClaimKind":null},{"id":"DFT_0038_1920-Q4","year":2026,"name":"EAST COAST DIGITAL PROGRAMME","department":"DFT","category":"Infrastructure and Construction","description":"The East Coast Digital Programme (ECDP) will implement the European Train Control System (ETCS) on 100 miles of the East Coast Mainline (ECML) between Kings Cross and Stoke Tunnel just south of Grantham, as well as on the Northern City Line (NCL) between Moorgate and Finsbury Park. The ECDP is the UK’s first implementation of ETCS on a mixed-use (freight and passenger trains) UK mainline route and will involve a major change in working practices for the rail industry. ETCS communicates signalling information into the driver’s cab in real-time, constantly updating how far ahead the train is authorised to move and providing optimal speed information. It removes the need for conventional lineside ‘traffic light’ signals, allowing for less-disruptive installation and maintenance. As well as having a lower whole life cost than conventional signals, ETCS on the NCL and the ECML will enhance operational resilience, is safer for passengers and rail workers, and has a 40% reduction in whole-life CO2 emissions through reduced use of materials compared to conventional signalling. ETCS also has the potential to unlock significant passenger and freight benefits through delivering an improvement in system capability of between 10 and 25%.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25-Q4, the National Infrastructure & Service Transformation Authority's Delivery Confidence Assessment rating at 25/26-Q4 is at RED. The NISTA review team noted that the partnership model continues to be the correct approach, and there have been positive changes in programme leadership. The review team highlighted that there is a need to re-baseline the programme, and that the programme is complex with several risks to delivery. They raised 19 recommendations to address. Recommendations include in the areas of ETCS freight train retrofitment, clearer accountabilities of leadership, and to continue the early identification of emerging risks to delivery.","startDate":"2017-05-01","endDate":"2030-10-14","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's baselined end-date at 25/26-Q4 remained at 14/10/2030. This date will be subject to a rebaseline exercise during 2026. The ECDP’s schedule has been set up to deliver ETCS on the ECML in a phased migration. The full migration to ETCS operations on the Northern City Line with the removal of conventional signals was achieved as planned in May 2025. In FY25/26, activities have focused on enabling works for the ETCS section on the ECML between Welwyn to Hitchin to provide a driver training area, due to enter into service August 2026. Works have included vehicle fitment, on-track testing and systems assurance. This milestone forecast has moved from December 2025 to August 2026, due to encountering challenges around system testing and assurance that will provide lessons for future ETCS schemes. The first mainline route section, originally due April 2027, is subject to change control as part of the rebaseline exercise.","fyBaseline":231.12,"fyForecast":194.42,"fyVariance":15.88,"varianceNarrative":"The budget variance exceeds 5%. This underspend is due to delays in contract awards and ETCS vehicle retrofitments, and less money has been spent on works for the renewals portion of ECDP (ie beyond Welwyn to Hitchin).","wholeLifeCost":3030.39,"costNarrative":"Compared to financial year 24/25-Q4, the programme's Whole Life Cost at 25/26-Q4 increased from £3,465m to £3,764m (in Nominal Prices). The programme anticipates that inflation will materialise as a key issue in the later years of the programme. As we move into the 2026-27 reporting cycle, the key risk to maintaining overall programme cost will be the cost of vehicle fitment and ETCS trackside infrastructure on the ECML. The programme is actively looking at how these costs can be managed whilst protecting the programme’s benefits. While delivery continues, ECDP is also maturing its delivery model to ensure it remains the enabler for future ETCS schemes.","benefits":1430.67,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed benefits at 25/26 Q4 remained at £2,783m (In Nominal £ Benefits). Benefits will be subject to a refresh during 2026. The benefits figure includes quantified performance, safety, socio-economic, environmental and wider economic monetised benefits.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 24/25-Q4, the National Infrastructure & Service Transformation Authority's Delivery Confidence Assessment rating at 25/26-Q4 is at RED. The NISTA review team noted that the partnership model continues to be the correct approach, and there have been positive changes in programme leadership. The review team highlighted that there is…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's baselined end-date at 25/26-Q4 remained at 14/10/2030. This date will be subject to a rebaseline exercise during 2026. The ECDP’s schedule has been set up to deliver ETCS on the ECML in a phased migration. The full migration to ETCS operations on the Northern City Line with the removal of conventional signals was achieved as planned in May 2025. In FY25/26, activities have focused on enabling works for the ETCS section on the ECML between Welwyn to Hitchin to provide a driver training area, due to enter into service August 2026. Works have included vehicle fitment, on-track testing and systems assurance. This milestone forecast has moved from December 2025 to August 2026, due to encountering challenges around system testing and assurance that will provide lessons for future ETCS schemes. The first mainline route section, originally due April 2027, is subject to change control as part of the rebaseline exercise.","narrativeClaimKind":null}],"previous":{"id":"DFT_0038_1920-Q4","year":2025,"name":"EAST COAST DIGITAL PROGRAMME","department":"DfT","category":"Infrastructure and Construction","description":"The East Coast Digital Programme (ECDP) will implement the European Train Control System (ETCS) on 100 miles of the East Coast Mainline (ECML) between Kings Cross and Stoke Tunnel just south of Grantham, as well as on the Northern City Line (NCL) between Moorgate and Finsbury Park. The ECDP is the UK’s first implementation of ETCS on a mixed used UK mainline route and will involve a major change in working practices for the rail industry. ETCS communicates signalling information into the driver’s cab in real-time, constantly updating how far ahead the train is authorised to move and providing optimal speed information. It removes the need for conventional lineside ‘traffic light’ signals, allowing for less-disruptive installation and maintenance. As well as having a lower whole life cost than conventional signals, ETCS on the NCL and the ECML will enhance operational resilience, is even safer for passengers and rail workers, and has a 40% reduction in whole-life CO2 emissions. ETCS also has the potential to unlock significant passenger and freight benefits through delivering an improvement in system capability of between 10 and 25%.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The IPA review team recognised the complexity of the programme, highlighting the technical challenge and a complex stakeholder environment. It praised the programme’s overall approach to managing this complexity, highlighting the success of the programme’s partnership model and strong capability across key resources. The review team highlighted several risks to delivery and raised 17 recommendations to address this. This included ensuring the ECDP is set up optimally to manage the systems integration challenge, ensuring that the ECDP has the right governance and processes to resolve key issues, and developing the programme’s approach to retrofitting freight locomotives with ETCS. The review team’s recommendations have been accepted with clear time-bound actions identified to ensure they are addressed. Notable changes include significant updates to ECDP’s operating model, governance and management information.","startDate":"2017-05-01","endDate":"2030-10-14","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 14/10/2030. This is primarily due to the following factors‚ The ECDP’s schedule has been set up to deliver ETCS on the ECML and the NCL in a phased migration. In FY24/25, activities have focused on delivering the first phases of this migration. This includes the full migration to ETCS operation on the NCL due May 2025 (achieved), as well as the implementation of an ETCS overlay on the ECML between Welwyn to Hitchin to provide a driver training area, due December 2025. Good progress was made in these activities in FY24/25. The NCL was successfully migrated to 100% ETCS operation with the conventional “traffic light” signals removed in May 2025, a significant programme milestone. Various enabling works have also been completed for the ETCS overlay between Welwyn to Hitchin. This includes infrastructure commissioning, progressive systems assurance, vehicle fitment, and on track testing. As such, this milestone has maintained its forecast for the next financial year, although some delivery pressures have been acknowledged. The programme’s end date remains unchanged at 14/10/2030. This end date is dependent on the programme’s approach to the later migration phases. No changes to the baseline of these dates were made in FY24/25 but this is currently under review. This review seeks to assess the impact of potential changes to ECDP’s funding profile and learnings from the first phases of migration.","fyBaseline":365.2,"fyForecast":271.8,"fyVariance":25.58,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The variance from the original budget baseline is broadly down to four factors. Contract award assurance for the delivery of ETCS infrastructure between Welwyn and Hitchin led to a delay, resulting in a reduction of the forecast FY24/25 spend. Funding for the ETCS fitment of the Class 800s was transferred to the DfT from the ECDP, as DfT held the existing commercial relationships with the related train operators and suppliers. Spend for the fitment of On Track Machine’s (OTM) and associated business change activities was deferred from FY24/25 due to delays in the required contract awards. Finally, funding for the delivery of ETCS trackside infrastructure was deferred from FY24/25 due to a reduction in Network Rail’s Eastern Region funding.","wholeLifeCost":3465.4,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 3477 to 3465. This is primarily due to the following factors‚ Programme whole life costs have remained stable since the last annual report. Despite inflation remaining a key risk to the programme this has not yet materialised into higher whole life costs through use of contingency, leveraging commercial tools, and a programme wide efficiencies campaign. As we move into the 2025-26 reporting cycle, the key risk to maintaining overall programme cost will be the cost vehicle fitment and the cost of ETCS trackside infrastructure on the ECML. The programme is actively looking at how these costs can be managed whilst protecting the programme’s benefits.","benefits":2783.1,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 824 to 2783. This is primarily due to the following factors‚ The benefits reporting methodology has been revised this year to align with how costs are reported. Previously ECDP benefits have been reported in 2011 prices. This has now been replaced with the nominal value. There has been no change in the ECDP's like for like monetised benefits in the last year. The benefits figure includes quantified performance, safety, socio-economic, environmental and wider economic monetised benefits.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Technical & integration"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The IPA review team recognised the complexity of the programme, highlighting the technical challenge and a complex stakeholder environment. It praised the programme’s…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 14/10/2030. This is primarily due to the following factors‚ The ECDP’s schedule has been set up to deliver ETCS on the ECML and the NCL in a phased migration. In FY24/25, activities have focused on delivering the first phases of this migration. This includes the full migration to ETCS operation on the NCL due May 2025 (achieved), as well as the implementation of an ETCS overlay on the ECML between Welwyn to Hitchin to provide a driver training area, due December 2025. Good progress was made in these activities in FY24/25. The NCL was successfully migrated to 100% ETCS operation with the conventional “traffic light” signals removed in May 2025, a significant programme milestone. Various enabling works have also been completed for the ETCS overlay between Welwyn to Hitchin. This includes infrastructure commissioning, progressive systems assurance, vehicle fitment, and on track testing. As such, this milestone has maintained its forecast for the next financial year, although some delivery pressures have been acknowledged. The programme’s end date remains unchanged at 14/10/2030. This end date is dependent on the programme’s approach to the later migration phases. No changes to the baseline of these dates were made in FY24/25 but this is currently under review. This review seeks to assess the impact of potential changes to ECDP’s funding profile and learnings from the first phases of migration.","narrativeClaimKind":null},"ratingDelta":1,"transition":"Worsened","endDateDeltaDays":0,"attentionScore":65,"attentionReasons":["Current published delivery confidence is Red","Published rating worsened from Amber to Red","In-year forecast variance is +15.9%"]},{"id":"MOD_0141_2122-Q1","year":2026,"name":"BRIMSTONE 3","department":"MOD","category":"Military Capability","description":"Brimstone 3 (B3) sustains the precise, low-collateral air-to-surface Brimstone capability on the Typhoon platform, it is also being integrated onto the Protector platform.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors. 1. While awaiting formal endorsement of the revised programme baseline, it continues to manage resourcing constraints and finalisation of the operational safety case. 2. Key progress has been made, including continued stability of the schedule, safety case advancement and programme maturity.","startDate":"2017-03-23","endDate":"2031-01-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 31/12/2028.","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Delivery & schedule","Commercial & supply chain","Cost & funding","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors. 1. While awaiting formal endorsement of the revised programme baseline, it continues to manage resourcing constraints and finalisation of the operational safety case. 2. Key progress…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":true,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 31/12/2028.","narrativeClaimKind":"date-mismatch","history":[{"id":"MOD_0141_2122-Q1","year":2022,"name":"Brimstone 3","department":"MOD","category":"Military Capability","description":"Brimstone 3A is an obsolescence removal programme for the in-service Brimstone 2 missile and is an integral part of the Weapons Evaluation and Capability Assurance vision for a common stockpile across more than one platform. Brimstone 3B is a software upgrade of the Brimstone 3A missile introducing slow speed, low level launch capabilities, and improved targeting algorithms to support Remotely Piloted Air Systems.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Brimstone 3 Programmes was previously contained within the Complex Weapons Portfolio and has been extracted to allow for better targeted approval and assurance processes. As such it is not possible to comment on its Delivery Confidence in March 21. However, it is currently assessed as Amber due to risks associated with additional Civil Aviation Authority assurance requirements when integrating on platforms such as Protector","startDate":"2017-07-01","endDate":"2029-04-30","scheduleNarrative":"The Brimstone 3 Programme was previously contained within the Complex Weapons Portfolio and has been extracted to allow for better targeted approval and assurance processes. As such there is no baseline date recorded for March 21 for comparison. However, closure is currently forecast to be March 31","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests)","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests)","benefits":null,"benefitsNarrative":"","themes":["Governance & assurance","Approvals & decisions","Commercial & supply chain","Delivery & schedule"],"evidenceExcerpt":"The Brimstone 3 Programmes was previously contained within the Complex Weapons Portfolio and has been extracted to allow for better targeted approval and assurance processes. As such it is not possible to comment on its Delivery Confidence in March 21. However, it is currently assessed as Amber due to risks associated with additional Civil Aviation…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The Brimstone 3 Programme was previously contained within the Complex Weapons Portfolio and has been extracted to allow for better targeted approval and assurance processes. As such there is no baseline date recorded for March 21 for comparison. However, closure is currently forecast to be March 31","narrativeClaimKind":null},{"id":"MOD_0141_2122-Q1","year":2023,"name":"Brimstone 3","department":"MOD","category":"Military Capability","description":"Brimstone 3 sustains the precise, low-collateral air-to-surface Brimstone capability on the Typhoon platform, and is planned to be integrated onto the Protector platform.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 decreased from Amber (IPA rating) to Red (SRO rating). This is primarily due to the following factors. There are challenges with resourcing sufficient suitably qualified and experienced people across the programme and delivery teams, and within industry. A series of deep-dives, along with a monthly Programme Board with the new Senior Responsible Owner have been put in place to address these challenges. Programme Governance and the availability Management Information is also being refreshed alongside a plan to improve Programme performance. Opportunities are being identified to bring schedule back within the approved timeline. The programme is also exploring opportunities to spiral capability developments to ensure capability is delivered at the earliest opportunity.","startDate":"2017-07-01","endDate":"2029-04-30","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2029-04-30. This is primarily due to the following factors. NA","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This programme does not report cashable benefits. Its aim is to provision the armed forces with the equipment and / or infrastructure required.","themes":["Commercial & supply chain","Delivery & schedule","Governance & assurance","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 decreased from Amber (IPA rating) to Red (SRO rating). This is primarily due to the following factors. There are challenges with resourcing sufficient suitably qualified and experienced people across the programme and delivery teams, and within industry. A series of…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2029-04-30. This is primarily due to the following factors. NA","narrativeClaimKind":null},{"id":"MOD_0141_2122-Q1","year":2024,"name":"Brimstone 3","department":"MOD","category":"Military Capability","description":"Brimstone 3 (B3) sustains the precise, low-collateral air-to-surface Brimstone capability on the Typhoon platform, it is also planned to be integrated onto the Protector platform.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 increased from Red to Amber. This is primarily due to the following factors. The Delivery Confidence Assessment of AMBER was endorsed by an IPA Review in February 2024. There are still concerns in relation to people capability and capacity, programme management information and partnering culture which are negatively impacting the programme. There are challenges with resourcing sufficient suitably qualified and experienced people across the programme and delivery teams, and within industry. Programme Governance and the availability of Management Information is also being refreshed alongside a plan to improve Programme performance. Opportunities to spiral capability developments to ensure capability is delivered at the earliest opportunity are being considered by the SRO.","startDate":"2017-03-23","endDate":"2028-12-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 has decreased from 2029-12-30 to 2028-12-31. This is primarily due to the following factors. The previous date provided was the OSD (Out of Service Date). The programme is also undergoing a rebaselining activity which may alter the end date again.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":0.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 0m.","themes":["Workforce & capability","Commercial & supply chain","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 increased from Red to Amber. This is primarily due to the following factors. The Delivery Confidence Assessment of AMBER was endorsed by an IPA Review in February 2024. There are still concerns in relation to people capability and capacity,…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 has decreased from 2029-12-30 to 2028-12-31. This is primarily due to the following factors. The previous date provided was the OSD (Out of Service Date). The programme is also undergoing a rebaselining activity which may alter the end date again.","narrativeClaimKind":null},{"id":"MOD_0141_2122-Q1","year":2025,"name":"BRIMSTONE 3","department":"MoD","category":"Military Capability","description":"Brimstone 3 sustains the precise, low-collateral air-to-surface Brimstone capability on the Typhoon platform. It is also planned to be integrated onto the Protector platform.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. This is primarily due to delays in agreeing the revised baseline, continued resourcing constraints, and the need to finalise the operational safety case. While key progress has been made, including stabilisation of the delivery schedule and safety case advancement, risks remain around programme maturity and delivery confidence.","startDate":"2017-03-27","endDate":"2028-12-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/12/2028. This is primarily due to the following factors. Compared to the financial year 23/24-Q4, the programme's end date in 24/25-Q4 remains scheduled to finish on 31-12-2028.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 43 - Commercial interests","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits","themes":["Delivery & schedule","Cost & funding","Commercial & supply chain","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. This is primarily due to delays in agreeing the revised baseline, continued resourcing constraints, and the need to finalise the operational safety case. While key progress has been made, including…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/12/2028. This is primarily due to the following factors. Compared to the financial year 23/24-Q4, the programme's end date in 24/25-Q4 remains scheduled to finish on 31-12-2028.","narrativeClaimKind":null},{"id":"MOD_0141_2122-Q1","year":2026,"name":"BRIMSTONE 3","department":"MOD","category":"Military Capability","description":"Brimstone 3 (B3) sustains the precise, low-collateral air-to-surface Brimstone capability on the Typhoon platform, it is also being integrated onto the Protector platform.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors. 1. While awaiting formal endorsement of the revised programme baseline, it continues to manage resourcing constraints and finalisation of the operational safety case. 2. Key progress has been made, including continued stability of the schedule, safety case advancement and programme maturity.","startDate":"2017-03-23","endDate":"2031-01-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 31/12/2028.","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Delivery & schedule","Commercial & supply chain","Cost & funding","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors. 1. While awaiting formal endorsement of the revised programme baseline, it continues to manage resourcing constraints and finalisation of the operational safety case. 2. Key progress…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":true,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 31/12/2028.","narrativeClaimKind":"date-mismatch"}],"previous":{"id":"MOD_0141_2122-Q1","year":2025,"name":"BRIMSTONE 3","department":"MoD","category":"Military Capability","description":"Brimstone 3 sustains the precise, low-collateral air-to-surface Brimstone capability on the Typhoon platform. It is also planned to be integrated onto the Protector platform.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. This is primarily due to delays in agreeing the revised baseline, continued resourcing constraints, and the need to finalise the operational safety case. While key progress has been made, including stabilisation of the delivery schedule and safety case advancement, risks remain around programme maturity and delivery confidence.","startDate":"2017-03-27","endDate":"2028-12-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/12/2028. This is primarily due to the following factors. Compared to the financial year 23/24-Q4, the programme's end date in 24/25-Q4 remains scheduled to finish on 31-12-2028.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 43 - Commercial interests","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits","themes":["Delivery & schedule","Cost & funding","Commercial & supply chain","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. This is primarily due to delays in agreeing the revised baseline, continued resourcing constraints, and the need to finalise the operational safety case. While key progress has been made, including…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/12/2028. This is primarily due to the following factors. Compared to the financial year 23/24-Q4, the programme's end date in 24/25-Q4 remains scheduled to finish on 31-12-2028.","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":761,"attentionScore":64,"attentionReasons":["Published commentary says the end date is unchanged while the published date moved","Current published delivery confidence is Amber","Published end date moved 761 days later","In-year forecast variance is +43.0%"]},{"id":"MOD_0056_2122-Q3","year":2026,"name":"LAND INTELLIGENCE, SURVEILLANCE, TARGET ACQUISITION AND RECONNAISSANCE (ISTAR)","department":"MOD","category":"Military Capability","description":"The Land Intelligence, Surveillance, Target Acquisition and Reconnaissance (ISTAR) Programme will deliver an adaptable, robust and agile system that will enable the Army to find the enemy at range in all operational environments. The bedrock of the system will be an open system architecture, designed to be fully integrated with current and future communications and information systems to enable digital integration across the Army, wider Defence, and our primary allies. This will enable a fully networked ISTAR system consisting of multiple sensors, that can be centrally commanded and coordinated. Automation will be used to speed up decision-making and reduce electronic emissions between component parts. The architecture, platforms and sensors required for the system will be developed and acquired separately, with a series of common standards ensuring that they remain compatible with the network.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 increased to Amber. This is primarily due to the following factors. 1. Delivery of the SRO’s Get Well Plan, including work done by the Programme Design and Integration Office on a digital ecosystem within Defence. This progress was achieved despite challenges with workforce capacity in the delivery teams and the wider complexities within Defence. 2. The improvement on the previous year’s assessment and confirmed by the Dec 2025 NISTA Assurance Review.","startDate":"2019-01-25","endDate":"2033-05-02","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 31/12/2027.","fyBaseline":79.13,"fyForecast":51.8,"fyVariance":34.54,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. 1. The programme did not spend its allocated budget due to delays in four major sub-programmes. 2. Key external factors were approvals delays, industrial capacity and a dynamic requirement set. Internally, under-resourcing of workforce limited the pace of work and the ability to respond to change. 3. Delays due to contract milestones play a big part in the variance. Delays to approvals pushing profile to the right. 4. The Watchkeeper Mid-Life Extension project has been deleted from the programme.","wholeLifeCost":1498.14,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) decreased from £1878.28M to £1622.50M This is primarily due to the following factors. 1. The Programme’s Whole Life Cost has reduced overall compared to 12 months ago. The reduction is driven primarily by Defence Board-approved requirement and scope changes, with costings removed in line with updated commissioning instructions. 2. Further decreases arise from reprofiling of assessment and delivery activity into later years due to approval and negotiation delays, incomplete achievement of system requirements, and delayed receipt of subcontractor software, resulting in Annual Budgeting Cycle impacts largely into Financial Year 26/27. 3. These reductions are partially offset by increases associated with updated Full Business Case 3 cost models using preferred bidder pricing, which has driven higher upfront support costs to enable accelerated Minimum Deployable Capability delivery, alongside minor revised estimates of cost for additional training requirements. 4. In addition, an underspend against forecast has been realised due to workforce control measures, particularly within ZODIAC RDEL, contributing to the overall reduction in Whole Life Cost. 5. Overall, movements reflect disciplined cost control, alignment to approved scope, and realistic reprofiling in line with delivery maturity.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4; the projects departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the fact that the benefits are not monetised.","themes":["Cost & funding","Delivery & schedule","Workforce & capability","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 increased to Amber. This is primarily due to the following factors. 1. Delivery of the SRO’s Get Well Plan, including work done by the Programme Design and Integration Office on a digital ecosystem within Defence. This progress was achieved despite…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":true,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 31/12/2027.","narrativeClaimKind":"date-mismatch","history":[{"id":"MOD_0056_2122-Q3","year":2022,"name":"Land Intelligence, Surveillance, Target Acquisition and Reconnaissance (ISTAR)","department":"MOD","category":"Military Capability","description":"The Land Intelligence, Surveillance, Target Acquisition and Reconnaissance Programme will deliver an adaptable, robust and agile system that will enable the Army to find the enemy at range in all operational environments. The bedrock of the system will be an open system architecture, designed to be fully integrated with current and future communications and information systems to enable digital integration across the Army, wider Defence, and primary allies. This will enable a fully networked Intelligence, Surveillance, Target Acquisition and Reconnaissance system consisting of multiple sensors, that can be centrally commanded and coordinated. Automation will be used to speed up decision-making and reduce electronic emissions between component parts. The architecture, platforms and sensors required for the system will be developed and acquired separately, with a series of common standards ensuring that they remain compatible with the network.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber. This is primarily due to the following factors: Positive progress has been made in recent months on resolving challenges, reducing key risks and increasing collaboration across the programme. Workforce resourcing remains a major concern that has a direct impact on delivery confidence, and on recruitment and retention of talent within the team.","startDate":"2019-01-25","endDate":"2027-12-31","scheduleNarrative":"The project end-date is 31 December 2027. This is primarily due to the following factors: The Programme entered the Government Major Projects Portfolio in Financial Year 2021/22, as such there is no baseline date recorded for March 21 for comparison.","fyBaseline":10.18,"fyForecast":7.57,"fyVariance":-30.0,"varianceNarrative":"The budget variance exceeds 5%. In-Year variance of c£2.6m due to sub-project Operational Analysis being incorrectly forecasted against the main equipment funding line rather than within operational expenditure, and as a result of delays to research and development activities","wholeLifeCost":1521.0,"costNarrative":"The projects Baseline Whole Life Cost is 1520.84 (£m). This is primarily due to the following factors: The AQUILA Formal Change Request has been implemented, reducing the Whole Life Cost. It is to be noted however that Evolutionary Capability Development future spiral development costs were not included within this Formal Change Request, though funding for this element is held within the AQUILA provision.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Workforce & capability"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber. This is primarily due to the following factors: Positive progress has been made in recent months on resolving challenges, reducing key risks and increasing collaboration across the programme. Workforce resourcing remains a major concern that has a direct impact on…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project end-date is 31 December 2027. This is primarily due to the following factors: The Programme entered the Government Major Projects Portfolio in Financial Year 2021/22, as such there is no baseline date recorded for March 21 for comparison.","narrativeClaimKind":null},{"id":"MOD_0056_2122-Q3","year":2023,"name":"Land Intelligence, Surveillance, Target Acquisition and Reconnaissance (ISTAR)","department":"MOD","category":"Military Capability","description":"The Land Intelligence, Surveillance, Target Acquisition and Reconnaissance Programme will deliver an adaptable, robust and agile system that will enable the Army to find the enemy at range in all operational environments. The bedrock of the system will be an open system architecture, designed to be fully integrated with current and future communications and information systems to enable digital integration across the Army, wider Defence, and our primary allies. This will enable a fully networked Intelligence, Surveillance, Target Acquisition and Reconnaissance system consisting of multiple sensors, that can be centrally commanded and coordinated. Automation will be used to speed up decision-making and reduce electronic emissions between component parts. The architecture, platforms and sensors required for the system will be developed and acquired separately, with a series of common standards ensuring that they remain compatible with the network.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber (SRO rating). This is primarily due to the following factors. Delays across the sub-programmes have added time and cost, the delays have also affected the ability to synchronise outcomes across the programme. In the short-term, workforce churn and relative inexperience of new team members is likely to increase risk. Uncertainty over the timing and content of workstrands on which the programme is dependant is another significant driver of delivery confidence.","startDate":"2019-01-25","endDate":"2027-12-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2027-12-31. This is primarily due to the following factors. NA","fyBaseline":30.57,"fyForecast":24.51,"fyVariance":-20.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors: The delay to the Watchkeeper Mid Life Extension Strategic Outline Business Case","wholeLifeCost":1598.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 increased from 1521m. to 1598m. This is primarily due to the following factors. Delays and increased inflation and Foreign Exchange. The normal Formal Change Request process has turned planning assumptions into more assured data which have refined costs and time in several sub-programmes.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This programme does not report cashable benefits. Its aim is to provision the armed forces with the equipment and / or infrastructure required.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber (SRO rating). This is primarily due to the following factors. Delays across the sub-programmes have added time and cost, the delays have also affected the ability to synchronise outcomes across the programme. In the short-term, workforce churn and…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2027-12-31. This is primarily due to the following factors. NA","narrativeClaimKind":null},{"id":"MOD_0056_2122-Q3","year":2024,"name":"Land Intelligence, Surveillance, Target Acquisition and Reconnaissance (ISTAR)","department":"MOD","category":"Military Capability","description":"The Land Intelligence, Surveillance, Target Acquisition and Reconnaissance (ISTAR) Programme will deliver an adaptable, robust and agile system that will enable the Army to find the enemy at range in all operational environments. The bedrock of the system will be an open system architecture; designed to be fully integrated with current and future communications and information systems to enable digital integration across the Army, wider Defence, and our primary allies. This will enable a fully networked ISTAR system consisting of multiple sensors, that can be centrally commanded and coordinated. Automation will be used to speed up decision-making and reduce electronic emissions between component parts. The architecture, platforms and sensors required for the system will be developed and acquired separately, with a series of common standards ensuring that they remain compatible with the network.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The lack of sufficient workforce is the single largest factor affecting delivery confidence. Additionally, industrial capacity and complex dependencies have added time and cost, affecting the ability to synchronise outcomes across the programme.","startDate":"2019-01-25","endDate":"2027-12-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained scheduled to finish on 2027-12-31. This is primarily due to the following factors. Though other sub-programme schedules within the overall programme have been delayed, ZODIAC, the core element, remains on track for delivery. The factors behind delays for other sub-programmes include delay to approvals and subsequent re-planning activities, complexity and sequencing of dependencies with other programmes, and the wider resource capacity issues in Army, delivery agents and the MOD.","fyBaseline":69.9,"fyForecast":48.61,"fyVariance":-30.458,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The programme did not spend its allocated budget due to delays in all four major sub-programmes. Key external factors were approvals delays (notably with SERPENS), industrial capacity and a dynamic requirement set. Internally, under-resourcing of workforce limited the pace of work and the ability to respond to change.","wholeLifeCost":1800.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 increased from 1598m to 1800m. This is primarily due to the following factors. Schedule slips have increased costs due to inflation and longer duration of standing programme delivery costs. Further cost growth is a result of additional clarity on costs as sub-programmes have matured.","benefits":0.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 0m.","themes":["Cost & funding","Delivery & schedule","Workforce & capability","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The lack of sufficient workforce is the single largest factor affecting delivery confidence. Additionally, industrial capacity and complex dependencies have added time and…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained scheduled to finish on 2027-12-31. This is primarily due to the following factors. Though other sub-programme schedules within the overall programme have been delayed, ZODIAC, the core element, remains on track for delivery. The factors behind delays for other sub-programmes include delay to approvals and subsequent re-planning activities, complexity and sequencing of dependencies with other programmes, and the wider resource capacity issues in Army, delivery agents and the MOD.","narrativeClaimKind":null},{"id":"MOD_0056_2122-Q3","year":2025,"name":"LAND INTELLIGENCE, SURVEILLANCE, TARGET ACQUISITION AND RECONNAISSANCE (ISTAR)","department":"MoD","category":"Military Capability","description":"The Land Intelligence, Surveillance, Target Acquisition and Reconnaissance (ISTAR) Programme will deliver an adaptable, robust and agile system that will enable the Army to find the enemy at range in all operational environments. The bedrock of the system will be an open system architecture, designed to be fully integrated with current and future communications and information systems to enable digital integration across the Army, wider Defence, and our primary allies. This will enable a fully networked ISTAR system consisting of multiple sensors, that can be centrally commanded and coordinated. Automation will be used to speed up decision-making and Reduce electronic emissions between component parts. The architecture, platforms and sensors required for the system will be developed and acquired separately, with a series of common standards ensuring that they remain compatible with the network.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is RED, compared with the project's assessment last year of AMBER. This is due to the following factors. The lack of sufficient workforce is the single largest factor affecting delivery confidence, and the outlook is for a improving position over the next year if anticipated workforce increase comes to fruition. A period of adaptation will be required when new resource arrives which may keep Confidence rating low as workforce augmentation. Delays have impacted across the sub-programmes due to awaiting approvals, industrial capacity and dependencies which have added time and cost. The delays have also affected the ability to synchronise outcomes across the programme. In the short-term the workforce churn and relative inexperience of new team members is likely to further increase risk.","startDate":"2019-01-25","endDate":"2027-12-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/12/2027.","fyBaseline":86.35,"fyForecast":38.28,"fyVariance":55.67,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The programme did not spend its allocated budget due to delays in four major sub-programmes. Key external factors were approvals delays, industrial capacity and a dynamic requirement set. Internally, under-resourcing of workforce limited the pace of work and the ability to respond to change. Delays due to contract milestones play a big part in the variance.","wholeLifeCost":1878.28,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 1800 to 1878. This is primarily due to the following factors. In year spending measures have led to reprofiling of funds, as well as underspend due to workforce measures - in particular ZODIAC Resource Departmental Expenditure Limits (RDEL). Furthermore, schedule slips have increased costs due to inflation and an increase in the duration of standing programme delivery costs.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits","themes":["Workforce & capability","Cost & funding","Delivery & schedule","Commercial & supply chain"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is RED, compared with the project's assessment last year of AMBER. This is due to the following factors. The lack of sufficient workforce is the single largest factor affecting delivery confidence, and the outlook is for a improving position over the next year if…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/12/2027.","narrativeClaimKind":null},{"id":"MOD_0056_2122-Q3","year":2026,"name":"LAND INTELLIGENCE, SURVEILLANCE, TARGET ACQUISITION AND RECONNAISSANCE (ISTAR)","department":"MOD","category":"Military Capability","description":"The Land Intelligence, Surveillance, Target Acquisition and Reconnaissance (ISTAR) Programme will deliver an adaptable, robust and agile system that will enable the Army to find the enemy at range in all operational environments. The bedrock of the system will be an open system architecture, designed to be fully integrated with current and future communications and information systems to enable digital integration across the Army, wider Defence, and our primary allies. This will enable a fully networked ISTAR system consisting of multiple sensors, that can be centrally commanded and coordinated. Automation will be used to speed up decision-making and reduce electronic emissions between component parts. The architecture, platforms and sensors required for the system will be developed and acquired separately, with a series of common standards ensuring that they remain compatible with the network.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 increased to Amber. This is primarily due to the following factors. 1. Delivery of the SRO’s Get Well Plan, including work done by the Programme Design and Integration Office on a digital ecosystem within Defence. This progress was achieved despite challenges with workforce capacity in the delivery teams and the wider complexities within Defence. 2. The improvement on the previous year’s assessment and confirmed by the Dec 2025 NISTA Assurance Review.","startDate":"2019-01-25","endDate":"2033-05-02","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 31/12/2027.","fyBaseline":79.13,"fyForecast":51.8,"fyVariance":34.54,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. 1. The programme did not spend its allocated budget due to delays in four major sub-programmes. 2. Key external factors were approvals delays, industrial capacity and a dynamic requirement set. Internally, under-resourcing of workforce limited the pace of work and the ability to respond to change. 3. Delays due to contract milestones play a big part in the variance. Delays to approvals pushing profile to the right. 4. The Watchkeeper Mid-Life Extension project has been deleted from the programme.","wholeLifeCost":1498.14,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) decreased from £1878.28M to £1622.50M This is primarily due to the following factors. 1. The Programme’s Whole Life Cost has reduced overall compared to 12 months ago. The reduction is driven primarily by Defence Board-approved requirement and scope changes, with costings removed in line with updated commissioning instructions. 2. Further decreases arise from reprofiling of assessment and delivery activity into later years due to approval and negotiation delays, incomplete achievement of system requirements, and delayed receipt of subcontractor software, resulting in Annual Budgeting Cycle impacts largely into Financial Year 26/27. 3. These reductions are partially offset by increases associated with updated Full Business Case 3 cost models using preferred bidder pricing, which has driven higher upfront support costs to enable accelerated Minimum Deployable Capability delivery, alongside minor revised estimates of cost for additional training requirements. 4. In addition, an underspend against forecast has been realised due to workforce control measures, particularly within ZODIAC RDEL, contributing to the overall reduction in Whole Life Cost. 5. Overall, movements reflect disciplined cost control, alignment to approved scope, and realistic reprofiling in line with delivery maturity.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4; the projects departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the fact that the benefits are not monetised.","themes":["Cost & funding","Delivery & schedule","Workforce & capability","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 increased to Amber. This is primarily due to the following factors. 1. Delivery of the SRO’s Get Well Plan, including work done by the Programme Design and Integration Office on a digital ecosystem within Defence. This progress was achieved despite…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":true,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 31/12/2027.","narrativeClaimKind":"date-mismatch"}],"previous":{"id":"MOD_0056_2122-Q3","year":2025,"name":"LAND INTELLIGENCE, SURVEILLANCE, TARGET ACQUISITION AND RECONNAISSANCE (ISTAR)","department":"MoD","category":"Military Capability","description":"The Land Intelligence, Surveillance, Target Acquisition and Reconnaissance (ISTAR) Programme will deliver an adaptable, robust and agile system that will enable the Army to find the enemy at range in all operational environments. The bedrock of the system will be an open system architecture, designed to be fully integrated with current and future communications and information systems to enable digital integration across the Army, wider Defence, and our primary allies. This will enable a fully networked ISTAR system consisting of multiple sensors, that can be centrally commanded and coordinated. Automation will be used to speed up decision-making and Reduce electronic emissions between component parts. The architecture, platforms and sensors required for the system will be developed and acquired separately, with a series of common standards ensuring that they remain compatible with the network.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is RED, compared with the project's assessment last year of AMBER. This is due to the following factors. The lack of sufficient workforce is the single largest factor affecting delivery confidence, and the outlook is for a improving position over the next year if anticipated workforce increase comes to fruition. A period of adaptation will be required when new resource arrives which may keep Confidence rating low as workforce augmentation. Delays have impacted across the sub-programmes due to awaiting approvals, industrial capacity and dependencies which have added time and cost. The delays have also affected the ability to synchronise outcomes across the programme. In the short-term the workforce churn and relative inexperience of new team members is likely to further increase risk.","startDate":"2019-01-25","endDate":"2027-12-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/12/2027.","fyBaseline":86.35,"fyForecast":38.28,"fyVariance":55.67,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The programme did not spend its allocated budget due to delays in four major sub-programmes. Key external factors were approvals delays, industrial capacity and a dynamic requirement set. Internally, under-resourcing of workforce limited the pace of work and the ability to respond to change. Delays due to contract milestones play a big part in the variance.","wholeLifeCost":1878.28,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 1800 to 1878. This is primarily due to the following factors. In year spending measures have led to reprofiling of funds, as well as underspend due to workforce measures - in particular ZODIAC Resource Departmental Expenditure Limits (RDEL). Furthermore, schedule slips have increased costs due to inflation and an increase in the duration of standing programme delivery costs.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits","themes":["Workforce & capability","Cost & funding","Delivery & schedule","Commercial & supply chain"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is RED, compared with the project's assessment last year of AMBER. This is due to the following factors. The lack of sufficient workforce is the single largest factor affecting delivery confidence, and the outlook is for a improving position over the next year if…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/12/2027.","narrativeClaimKind":null},"ratingDelta":-1,"transition":"Improved","endDateDeltaDays":1949,"attentionScore":62,"attentionReasons":["Published commentary says the end date is unchanged while the published date moved","Current published delivery confidence is Amber","Published end date moved 1,949 days later","In-year forecast variance is +34.5%"]},{"id":"BEIS_0079_2122-Q4","year":2026,"name":"MATRIX CLUSTER TRANSFORMATION PROGRAMME","department":"DSIT","category":"Government Transformation and Service Delivery","description":"The Matrix Programme seeks to implement the Government Shared Service Strategy for nine government departments by modernising and consolidating back-office systems and services. This will include delivery of a new shared business process service (BPS), a combined enterprise resource planning (ERP) system including ancillary technologies, and a change in ways of working for all users.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Matrix Programme is rated Red, reflecting a number of material issues identified through a planned Stage Gate that impact delivery confidence. These include Stage Gate 1 Readiness issues, notably unmet End‑to‑End Cycle 1 Entry Criteria. Data protection and information assurance risks were also identified, with some data segments having been unintentionally visible and therefore formal entry of the test phase could not take place. This gave rise to the need to rebaseline delivery plans. The Matrix Programme Board met on 26 March to consider the case for re‑baselining the programme. Replanning is intended to establish a more realistic, credible, and achievable forward plan in response to ongoing delivery challenges. Current emerging analysis indicates a delay of 3-6 months, which would move the Phase 1a user go‑live to late 2026. Proposed mitigations centre on alongside structured scenario planning to assess a new plan. A defined set of actions is underway to support an informed decision on revised go‑live dates at the Programme Board in May. System issues have now been resolved and this May date will enable us to assess test progress too. The single biggest risk to this is Depts being unable to find functional SME capacity to undertake the high level of testing they have identified as being required, given their low risk appetite. Notwithstanding the above, there has been tangible progress. Data migration activity is focused on improving data quality ahead of the final migration cycle, thereby reducing risk to subsequent testing and assurance. Core design configuration is now largely complete, with remaining exceptions tightly governed. End‑to‑end testing capacity and execution have improved through a revised testing approach, prioritisation of payroll‑critical scenarios, and the introduction of additional centrally cleared testing support. Mitigations are also being applied across wider design, readiness, and change activity. An iterative delivery approach is enabling service design, change impact assessment, and training needs analysis to progress in line with incremental design maturity. A programme‑level Training Strategy has been agreed and baselined, with further refinement underway as training requirements are confirmed. In parallel, early engagement with UKSBS on the delivery of training for Phase 1a professional users is strengthening delivery resilience and continuity. There remains a significant dependency risk associated with alignment to Shared Services for Government (SSfG) initiatives. The Programme’s ability to deliver agreed time, cost, and quality outcomes is, in part, dependent on SSfG decisions and delivery that sit outside the Programme’s direct control. This continues to represent a material risk to delivery confidence and reinforces the importance of a realistic and evidence‑based rebaseline. There is a significant risk associated with the Pension provider's inability to confirm when end to end pension integration will be able to take place. There was positive progress in March, when Programme Business Case 3 (PBC3) received HM Treasury approval for 2026–27, subject to six conditions. This provides a confirmed funding baseline while work proceeds on the PBC3 addendum (PBC3a), which will seek approval for funding beyond 2027 following re‑baselining. Overall, the current period is focused on embedding mitigations, strengthening delivery assurance and controls, and agreeing a credible and achievable rebaseline that supports informed decision‑making on revised go‑live dates and improves confidence in the Programme’s delivery trajectory.","startDate":"2022-04-01","endDate":"2027-11-27","scheduleNarrative":"Since the programme plan and associated critical path were baselined in October 2024 with Phase 1a Go Live scheduled for May 2026 and subsequent phased go lives planned ahead of the programme end date of 30 November 2026, the programme has experienced delays primarily driven by Stage Gate 1 Readiness issues, including delays in achieving End to End Cycle 1 entry criteria. In response, the Matrix Programme Board met on 26/3/26 to consider the case for re baselining the programme, including the development of a rectification plan and the consideration of several planning scenarios.","fyBaseline":122.55,"fyForecast":115.95,"fyVariance":5.38,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to slippage in the system integrator milestones to FY26/27.","wholeLifeCost":889.81,"costNarrative":"Compared to FY24/25 Q4, the project's agreed Whole Life Cost at FY25/26 Q4 has changed due to development of a new programme business case, PBC3. Whole life costs at PBC3 include Departmental baselines and Programme resource costs, transformation, and service integrator over a 15-year appraisal period.","benefits":337.11,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) increased from last year's £373m to this years £405m: The previous submission was the PBC2 Addendum. As a result there have been changes across categories: - Reporting changes: PBC3 includes updated baselines of costs and benefits, and efficiency estimates - Design changes: The progression of service design has informed this update - Non-political scope changes: There have been updates to user numbers; some additional disbenefits identified, etc. N.B. Disbenefits are captured within the efficiency estimates, and are not quantified separately. As a result, the reporting shows net benefits.","themes":["Delivery & schedule","Technical & integration","Cost & funding","Scope & requirements"],"evidenceExcerpt":"The Matrix Programme is rated Red, reflecting a number of material issues identified through a planned Stage Gate that impact delivery confidence. These include Stage Gate 1 Readiness issues, notably unmet End‑to‑End Cycle 1 Entry Criteria. Data protection and information assurance risks were also identified, with some data segments having been…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Since the programme plan and associated critical path were baselined in October 2024 with Phase 1a Go Live scheduled for May 2026 and subsequent phased go lives planned ahead of the programme end date of 30 November 2026, the programme has experienced delays primarily driven by Stage Gate 1 Readiness issues, including delays in achieving End to End Cycle 1 entry criteria. In response, the Matrix Programme Board met on 26/3/26 to consider the case for re baselining the programme, including the development of a rectification plan and the consideration of several planning scenarios.","narrativeClaimKind":null,"history":[{"id":"BEIS_0079_2122-Q4","year":2023,"name":"Matrix Cluster Transformation Programme","department":"DSIT","category":"Government Transformation and Service Delivery","description":"The Matrix Programme seeks to implement the Government Shared Service Strategy for eight government departments by modernising and consolidating back-office systems and services. This will include delivery of a new shared business process service (BPS), a combined enterprise resource planning (ERP) system including ancillary technologies, and a change in ways of working for all users.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","startDate":null,"endDate":null,"scheduleNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","themes":["Commercial & supply chain"],"evidenceExcerpt":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests. Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","narrativeClaimKind":null},{"id":"BEIS_0079_2122-Q4","year":2024,"name":"Matrix Cluster Transformation Programme","department":"DSIT","category":"Government Transformation and Service Delivery","description":"","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","startDate":null,"endDate":null,"scheduleNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","themes":["Commercial & supply chain"],"evidenceExcerpt":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests. Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","narrativeClaimKind":null},{"id":"BEIS_0079_2122-Q4","year":2025,"name":"MATRIX CLUSTER TRANSFORMATION PROGRAMME","department":"DSIT","category":"Government Transformation and Service Delivery","description":"The Matrix Transformation Programme seeks to implement the Government Shared Service Strategy for eight government departments by modernising and consolidating back-office systems and services. This will include delivery of a new shared business process service (BPS), a combined enterprise resource planning (ERP) system including ancillary technologies, and a change in ways of working for all users.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER. The programme’s overall progress and performance remained on track, with concerns being manageable well and delivery generally proceeding as planned. However, there had some delays, which including receiving and finalising volumetrics and benefits baselining data. There was a positive development with contracts secured for external support to assist with these assessments. The Change Impact Assessments (CIAs) were expected to inform the development of the Economic Model for Programme Business Case v3 (PBCv3). While the programme had sufficient information to begin PBCv3 discussions, lessons learned had to be applied to ensure future data commissions would be delivered on time. Alongside system configuration, the team mapped to where activities and tasks for new services would sit, enabling the completion of CIAs in time for PBCv3. Re-planning efforts had been undertaken to resolve conflicts and reduce risks related to decision-making and data returns. These risks did not threaten the go-live date, but required careful management to avoid placing pressure on the PBCv3 approval timeline in September 2025.","startDate":"2022-04-01","endDate":"2027-11-30","scheduleNarrative":"The project's end-date at 24/25-Q4 is scheduled to be 30/11/2027. This is primarily due to the following factors‚ The programme plan and associated critical path were baselined in October 2024 with Phase 1a go-live planned for May 2026, with subsequent phased go-lives ahead of programme end date on 30/11/2027. Factors influencing this schedule include the successful selection of a technology solution and appointment of a technology partner, appointment of a service provider and service implementation and transformation partners. These have now been done and delivery risk focuses on closing out the design phase by end of July 2025, resolving conflicts between the shared services strategy and the interoperability strategy, managing the level of change departments are undertaking when stability is needed and any impacts of the future years SR settlement.","fyBaseline":48.24,"fyForecast":51.0,"fyVariance":5.72,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The budget variance is marginally over the 5% tolerance, at 5.4%, the main variance was driven by changes in transition costs from external service providers.","wholeLifeCost":938.0,"costNarrative":"The project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) is 938. This is primarily due to the following factors‚ Whole life costs are unchanged over the period and encompass 15-year appraisal period. Whole life costs include Departmental baselines and Programme resource costs, transformation, and service integrator.","benefits":373.0,"benefitsNarrative":"The project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) is 373. This is primarily due to the following factors‚ The Matrix Transformation Programme has identified a range of benefits realised from the new shared services operating model, driven by automation, self-service, and changes to the way of working from adopting Workday best practices. These included: (1) Cash-releasing efficiency benefits. Reduction in spending due to system improvements and process alignment, allowing for more efficient practices, e.g., reduced spend on contingent labour due to improved skill management. (2) Non-cash-releasing time and Productivity benefits. Direct reduction in staff time required to complete processes, freeing up that time for reallocation to other value-adding tasks. (3) Net Run cost reductions, Reducing operational costs, e.g. due to decreased license costs. (4) Non-Cash Releasing, FTE Efficiencies: Direct reduction in staff time required to complete processes, decreasing the FTE required for that process area.","themes":["Delivery & schedule","Cost & funding","Technical & integration","Approvals & decisions"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER. The programme’s overall progress and performance remained on track, with concerns being manageable well and delivery generally proceeding as planned. However, there had some delays, which including receiving and finalising volumetrics and benefits baselining…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 24/25-Q4 is scheduled to be 30/11/2027. This is primarily due to the following factors‚ The programme plan and associated critical path were baselined in October 2024 with Phase 1a go-live planned for May 2026, with subsequent phased go-lives ahead of programme end date on 30/11/2027. Factors influencing this schedule include the successful selection of a technology solution and appointment of a technology partner, appointment of a service provider and service implementation and transformation partners. These have now been done and delivery risk focuses on closing out the design phase by end of July 2025, resolving conflicts between the shared services strategy and the interoperability strategy, managing the level of change departments are undertaking when stability is needed and any impacts of the future years SR settlement.","narrativeClaimKind":null},{"id":"BEIS_0079_2122-Q4","year":2026,"name":"MATRIX CLUSTER TRANSFORMATION PROGRAMME","department":"DSIT","category":"Government Transformation and Service Delivery","description":"The Matrix Programme seeks to implement the Government Shared Service Strategy for nine government departments by modernising and consolidating back-office systems and services. This will include delivery of a new shared business process service (BPS), a combined enterprise resource planning (ERP) system including ancillary technologies, and a change in ways of working for all users.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Matrix Programme is rated Red, reflecting a number of material issues identified through a planned Stage Gate that impact delivery confidence. These include Stage Gate 1 Readiness issues, notably unmet End‑to‑End Cycle 1 Entry Criteria. Data protection and information assurance risks were also identified, with some data segments having been unintentionally visible and therefore formal entry of the test phase could not take place. This gave rise to the need to rebaseline delivery plans. The Matrix Programme Board met on 26 March to consider the case for re‑baselining the programme. Replanning is intended to establish a more realistic, credible, and achievable forward plan in response to ongoing delivery challenges. Current emerging analysis indicates a delay of 3-6 months, which would move the Phase 1a user go‑live to late 2026. Proposed mitigations centre on alongside structured scenario planning to assess a new plan. A defined set of actions is underway to support an informed decision on revised go‑live dates at the Programme Board in May. System issues have now been resolved and this May date will enable us to assess test progress too. The single biggest risk to this is Depts being unable to find functional SME capacity to undertake the high level of testing they have identified as being required, given their low risk appetite. Notwithstanding the above, there has been tangible progress. Data migration activity is focused on improving data quality ahead of the final migration cycle, thereby reducing risk to subsequent testing and assurance. Core design configuration is now largely complete, with remaining exceptions tightly governed. End‑to‑end testing capacity and execution have improved through a revised testing approach, prioritisation of payroll‑critical scenarios, and the introduction of additional centrally cleared testing support. Mitigations are also being applied across wider design, readiness, and change activity. An iterative delivery approach is enabling service design, change impact assessment, and training needs analysis to progress in line with incremental design maturity. A programme‑level Training Strategy has been agreed and baselined, with further refinement underway as training requirements are confirmed. In parallel, early engagement with UKSBS on the delivery of training for Phase 1a professional users is strengthening delivery resilience and continuity. There remains a significant dependency risk associated with alignment to Shared Services for Government (SSfG) initiatives. The Programme’s ability to deliver agreed time, cost, and quality outcomes is, in part, dependent on SSfG decisions and delivery that sit outside the Programme’s direct control. This continues to represent a material risk to delivery confidence and reinforces the importance of a realistic and evidence‑based rebaseline. There is a significant risk associated with the Pension provider's inability to confirm when end to end pension integration will be able to take place. There was positive progress in March, when Programme Business Case 3 (PBC3) received HM Treasury approval for 2026–27, subject to six conditions. This provides a confirmed funding baseline while work proceeds on the PBC3 addendum (PBC3a), which will seek approval for funding beyond 2027 following re‑baselining. Overall, the current period is focused on embedding mitigations, strengthening delivery assurance and controls, and agreeing a credible and achievable rebaseline that supports informed decision‑making on revised go‑live dates and improves confidence in the Programme’s delivery trajectory.","startDate":"2022-04-01","endDate":"2027-11-27","scheduleNarrative":"Since the programme plan and associated critical path were baselined in October 2024 with Phase 1a Go Live scheduled for May 2026 and subsequent phased go lives planned ahead of the programme end date of 30 November 2026, the programme has experienced delays primarily driven by Stage Gate 1 Readiness issues, including delays in achieving End to End Cycle 1 entry criteria. In response, the Matrix Programme Board met on 26/3/26 to consider the case for re baselining the programme, including the development of a rectification plan and the consideration of several planning scenarios.","fyBaseline":122.55,"fyForecast":115.95,"fyVariance":5.38,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to slippage in the system integrator milestones to FY26/27.","wholeLifeCost":889.81,"costNarrative":"Compared to FY24/25 Q4, the project's agreed Whole Life Cost at FY25/26 Q4 has changed due to development of a new programme business case, PBC3. Whole life costs at PBC3 include Departmental baselines and Programme resource costs, transformation, and service integrator over a 15-year appraisal period.","benefits":337.11,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) increased from last year's £373m to this years £405m: The previous submission was the PBC2 Addendum. As a result there have been changes across categories: - Reporting changes: PBC3 includes updated baselines of costs and benefits, and efficiency estimates - Design changes: The progression of service design has informed this update - Non-political scope changes: There have been updates to user numbers; some additional disbenefits identified, etc. N.B. Disbenefits are captured within the efficiency estimates, and are not quantified separately. As a result, the reporting shows net benefits.","themes":["Delivery & schedule","Technical & integration","Cost & funding","Scope & requirements"],"evidenceExcerpt":"The Matrix Programme is rated Red, reflecting a number of material issues identified through a planned Stage Gate that impact delivery confidence. These include Stage Gate 1 Readiness issues, notably unmet End‑to‑End Cycle 1 Entry Criteria. Data protection and information assurance risks were also identified, with some data segments having been…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Since the programme plan and associated critical path were baselined in October 2024 with Phase 1a Go Live scheduled for May 2026 and subsequent phased go lives planned ahead of the programme end date of 30 November 2026, the programme has experienced delays primarily driven by Stage Gate 1 Readiness issues, including delays in achieving End to End Cycle 1 entry criteria. In response, the Matrix Programme Board met on 26/3/26 to consider the case for re baselining the programme, including the development of a rectification plan and the consideration of several planning scenarios.","narrativeClaimKind":null}],"previous":{"id":"BEIS_0079_2122-Q4","year":2025,"name":"MATRIX CLUSTER TRANSFORMATION PROGRAMME","department":"DSIT","category":"Government Transformation and Service Delivery","description":"The Matrix Transformation Programme seeks to implement the Government Shared Service Strategy for eight government departments by modernising and consolidating back-office systems and services. This will include delivery of a new shared business process service (BPS), a combined enterprise resource planning (ERP) system including ancillary technologies, and a change in ways of working for all users.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER. The programme’s overall progress and performance remained on track, with concerns being manageable well and delivery generally proceeding as planned. However, there had some delays, which including receiving and finalising volumetrics and benefits baselining data. There was a positive development with contracts secured for external support to assist with these assessments. The Change Impact Assessments (CIAs) were expected to inform the development of the Economic Model for Programme Business Case v3 (PBCv3). While the programme had sufficient information to begin PBCv3 discussions, lessons learned had to be applied to ensure future data commissions would be delivered on time. Alongside system configuration, the team mapped to where activities and tasks for new services would sit, enabling the completion of CIAs in time for PBCv3. Re-planning efforts had been undertaken to resolve conflicts and reduce risks related to decision-making and data returns. These risks did not threaten the go-live date, but required careful management to avoid placing pressure on the PBCv3 approval timeline in September 2025.","startDate":"2022-04-01","endDate":"2027-11-30","scheduleNarrative":"The project's end-date at 24/25-Q4 is scheduled to be 30/11/2027. This is primarily due to the following factors‚ The programme plan and associated critical path were baselined in October 2024 with Phase 1a go-live planned for May 2026, with subsequent phased go-lives ahead of programme end date on 30/11/2027. Factors influencing this schedule include the successful selection of a technology solution and appointment of a technology partner, appointment of a service provider and service implementation and transformation partners. These have now been done and delivery risk focuses on closing out the design phase by end of July 2025, resolving conflicts between the shared services strategy and the interoperability strategy, managing the level of change departments are undertaking when stability is needed and any impacts of the future years SR settlement.","fyBaseline":48.24,"fyForecast":51.0,"fyVariance":5.72,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The budget variance is marginally over the 5% tolerance, at 5.4%, the main variance was driven by changes in transition costs from external service providers.","wholeLifeCost":938.0,"costNarrative":"The project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) is 938. This is primarily due to the following factors‚ Whole life costs are unchanged over the period and encompass 15-year appraisal period. Whole life costs include Departmental baselines and Programme resource costs, transformation, and service integrator.","benefits":373.0,"benefitsNarrative":"The project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) is 373. This is primarily due to the following factors‚ The Matrix Transformation Programme has identified a range of benefits realised from the new shared services operating model, driven by automation, self-service, and changes to the way of working from adopting Workday best practices. These included: (1) Cash-releasing efficiency benefits. Reduction in spending due to system improvements and process alignment, allowing for more efficient practices, e.g., reduced spend on contingent labour due to improved skill management. (2) Non-cash-releasing time and Productivity benefits. Direct reduction in staff time required to complete processes, freeing up that time for reallocation to other value-adding tasks. (3) Net Run cost reductions, Reducing operational costs, e.g. due to decreased license costs. (4) Non-Cash Releasing, FTE Efficiencies: Direct reduction in staff time required to complete processes, decreasing the FTE required for that process area.","themes":["Delivery & schedule","Cost & funding","Technical & integration","Approvals & decisions"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER. The programme’s overall progress and performance remained on track, with concerns being manageable well and delivery generally proceeding as planned. However, there had some delays, which including receiving and finalising volumetrics and benefits baselining…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 24/25-Q4 is scheduled to be 30/11/2027. This is primarily due to the following factors‚ The programme plan and associated critical path were baselined in October 2024 with Phase 1a go-live planned for May 2026, with subsequent phased go-lives ahead of programme end date on 30/11/2027. Factors influencing this schedule include the successful selection of a technology solution and appointment of a technology partner, appointment of a service provider and service implementation and transformation partners. These have now been done and delivery risk focuses on closing out the design phase by end of July 2025, resolving conflicts between the shared services strategy and the interoperability strategy, managing the level of change departments are undertaking when stability is needed and any impacts of the future years SR settlement.","narrativeClaimKind":null},"ratingDelta":1,"transition":"Worsened","endDateDeltaDays":-3,"attentionScore":62,"attentionReasons":["Current published delivery confidence is Red","Published rating worsened from Amber to Red","In-year forecast variance is +5.4%"]},{"id":"DLUHC_0250_2324-Q1","year":2026,"name":"Remediation Portfolio","department":"MHCLG","category":"Infrastructure and Construction","description":"The Remediation Portfolio’s overarching strategic objective is to bring all buildings over 11 metres affected by unsafe cladding up to the minimum life-safety standard quickly, completely, proportionately and consistently. Its objectives are to identify all affected buildings, remediate them at pace and ensure those responsible pay, thereby protecting the taxpayer. These objectives are underpinned by four operating principles: supporting residents, remediating to the right standards, delivering value for money and taking a risk-based approach. Remediation funding above the Government’s capped £5.15bn contribution will be recouped from industry.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"While delivery is set to accelerate, with more buildings expected to start remediation during this Parliament than prior to 2024/25, the SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 decreased to Red. This reflects risks to pace and affordability which are constraining delivery against planned timelines, including higher-than-anticipated social housing volumes, Building Safety Regulator constraints impacting progression of works, the need to accelerate delivery through developers and anticipated construction cost inflation. As a result, delivery against the Remediation Acceleration Plan and within the 2025 Full Business Case assumptions remains challenging. Targeted action is underway, including increasing Gateway 2 throughput, strengthening delivery planning with social sector partners, and working with developers to improve pace. Developer cost recovery activity is progressing, alongside preparations for the Building Safety Levy launch (October 2026). As of March 2026, 4,322 buildings over 11 metres have been identified with unsafe cladding, representing an estimated 50–76% of all buildings that will require remediation as part of MHCLG’s remediation programmes. For the 4,322 buildings identified with unsafe cladding, remediation has started on 2,399, including 1,531 that have been completed and 868 now on site. A further 1,923 buildings are in the programme but have not yet started on site.","startDate":"2023-06-26","endDate":"2036-03-31","scheduleNarrative":"There has been no change to the schedule for the programme.","fyBaseline":887.64,"fyForecast":840.58,"fyVariance":5.3,"varianceNarrative":"The CDEL 25/26 budget variance exceeds 5%. Underspends were predominantly driven by the ACM programme, where key milestones were not achieved in time for costs to be recognised by year end. These underspends reflect delivery slippage rather than savings and are expected to be incurred in future financial years.","wholeLifeCost":9726.6,"costNarrative":"The WLC has increased by £104m following the Spending Review outcome and adjustments for inflation in real terms. This update includes a lower estimated number of buildings but higher per building costs, which has slightly increased the estimate.","benefits":null,"benefitsNarrative":"Exempt under Section 22 - Information intended for future publication","themes":["Delivery & schedule","Cost & funding","Commercial & supply chain","Approvals & decisions"],"evidenceExcerpt":"While delivery is set to accelerate, with more buildings expected to start remediation during this Parliament than prior to 2024/25, the SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 decreased to Red. This reflects risks to pace and affordability which are constraining delivery against planned timelines, including higher-than-anticipated…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"There has been no change to the schedule for the programme.","narrativeClaimKind":null,"history":[{"id":"DLUHC_0250_2324-Q1","year":2024,"name":"Remediation Portfolio","department":"DLUHC","category":"Infrastructure and Construction","description":"The overarching aim of the portfolio is to oversee the remediation of residential buildings 11 metres and over in height with unsafe external wall systems through five building safety programmes, and to bring them up to the minimum life-safety standard.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. As at March 24: We continue to assess the delivery confidence of the programme as amber._x000D_ _x000D_ The programme continues to focus on the IPA recommendations to maintain delivery confidence in addressing unsafe cladding remediation.","startDate":"2023-06-26","endDate":"2036-03-31","scheduleNarrative":"The project's end-date at 23/24-Q4 is 2036-03-31. This is primarily due to the following factors. As at March 24: The project's end-date is March 2036.","fyBaseline":732.0,"fyForecast":676.49,"fyVariance":-8.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The variance relates to lower than expected RDEL costs due to delays in recruitment.","wholeLifeCost":9915.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 23/24-Q4 is 9915m. This is primarily due to the following factors. Whole Life Costs have not changed.","benefits":6748.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 6748m. The project's departmental-agree monetised benefits at 23/24-Q4 is 6748m.","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. As at March 24: We continue to assess the delivery confidence of the programme as amber._x000D_ _x000D_ The programme continues to focus on the IPA recommendations to maintain delivery confidence in addressing…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 23/24-Q4 is 2036-03-31. This is primarily due to the following factors. As at March 24: The project's end-date is March 2036.","narrativeClaimKind":null},{"id":"DLUHC_0250_2324-Q1","year":2025,"name":"Remediation Portfolio","department":"MHCLG","category":"Infrastructure and Construction","description":"The Remediation Portfolio’s overarching strategic objective is to bring all affected buildings over 11 metres with unsafe cladding up to the minimum life-safety standard quickly, completely, proportionately, and consistently. The objectives of the portfolio are to: fix buildings at pace, identify all affected buildings with unsafe cladding and ensure those responsible pay and protect the taxpayer. These objectives work with a set of four operating principles: support residents, deliver remediation to the right standards, deliver value for money and ensure remediation takes a risk-based approach. All funding for remediating buildings, over the Government’s capped £5.15bn contribution, will be recouped from industry.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Delivery confidence remains amber due to the need to accelerate the pace of remediation, progress developer debt recovery and implement the Building Safety Levy. As of April 2025, there are 5,052 residential buildings 11 metres and over in height identified with unsafe cladding with 1652 having completed remediation works. Identification of 11–18m buildings requiring remediation is continuing, with over 500 more 11-18m buildings monitored compared to a year ago. The portfolio has published performance targets and is delivering its Remediation Acceleration Plan, with a public update on progress and further interventions expected following the 2025 Spending Review this summer.","startDate":"2023-06-26","endDate":"2036-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2036. This is primarily due to the following factors‚ The end date remains at 31/03/203.","fyBaseline":517.3,"fyForecast":437.7,"fyVariance":15.39,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ There is underspend due to social/private sector costs in the Aluminium Composite Material (ACM) programme being reduced caused by late building completions and lower than expected starts in the Building Safety Fund (BSF) programme. Additional underspend due to staff costs savings in the ACM and BSF programmes, programme delays and supporting functions paying out less than expected for enforcement grants and lower legal costs.","wholeLifeCost":9915.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 9915. This is primarily due to the following factors‚ The modelled whole life cost of the portfolio has not been updated in this report due to uncertainty surrounding the Spending Review outcome. This forecast will be updated once the Spending Review outcome has been confirmed.","benefits":null,"benefitsNarrative":"Section 22 - Information intended for future publication","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Delivery confidence remains amber due to the need to accelerate the pace of remediation, progress developer debt recovery and implement the Building Safety Levy. As…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2036. This is primarily due to the following factors‚ The end date remains at 31/03/203.","narrativeClaimKind":null},{"id":"DLUHC_0250_2324-Q1","year":2026,"name":"Remediation Portfolio","department":"MHCLG","category":"Infrastructure and Construction","description":"The Remediation Portfolio’s overarching strategic objective is to bring all buildings over 11 metres affected by unsafe cladding up to the minimum life-safety standard quickly, completely, proportionately and consistently. Its objectives are to identify all affected buildings, remediate them at pace and ensure those responsible pay, thereby protecting the taxpayer. These objectives are underpinned by four operating principles: supporting residents, remediating to the right standards, delivering value for money and taking a risk-based approach. Remediation funding above the Government’s capped £5.15bn contribution will be recouped from industry.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"While delivery is set to accelerate, with more buildings expected to start remediation during this Parliament than prior to 2024/25, the SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 decreased to Red. This reflects risks to pace and affordability which are constraining delivery against planned timelines, including higher-than-anticipated social housing volumes, Building Safety Regulator constraints impacting progression of works, the need to accelerate delivery through developers and anticipated construction cost inflation. As a result, delivery against the Remediation Acceleration Plan and within the 2025 Full Business Case assumptions remains challenging. Targeted action is underway, including increasing Gateway 2 throughput, strengthening delivery planning with social sector partners, and working with developers to improve pace. Developer cost recovery activity is progressing, alongside preparations for the Building Safety Levy launch (October 2026). As of March 2026, 4,322 buildings over 11 metres have been identified with unsafe cladding, representing an estimated 50–76% of all buildings that will require remediation as part of MHCLG’s remediation programmes. For the 4,322 buildings identified with unsafe cladding, remediation has started on 2,399, including 1,531 that have been completed and 868 now on site. A further 1,923 buildings are in the programme but have not yet started on site.","startDate":"2023-06-26","endDate":"2036-03-31","scheduleNarrative":"There has been no change to the schedule for the programme.","fyBaseline":887.64,"fyForecast":840.58,"fyVariance":5.3,"varianceNarrative":"The CDEL 25/26 budget variance exceeds 5%. Underspends were predominantly driven by the ACM programme, where key milestones were not achieved in time for costs to be recognised by year end. These underspends reflect delivery slippage rather than savings and are expected to be incurred in future financial years.","wholeLifeCost":9726.6,"costNarrative":"The WLC has increased by £104m following the Spending Review outcome and adjustments for inflation in real terms. This update includes a lower estimated number of buildings but higher per building costs, which has slightly increased the estimate.","benefits":null,"benefitsNarrative":"Exempt under Section 22 - Information intended for future publication","themes":["Delivery & schedule","Cost & funding","Commercial & supply chain","Approvals & decisions"],"evidenceExcerpt":"While delivery is set to accelerate, with more buildings expected to start remediation during this Parliament than prior to 2024/25, the SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 decreased to Red. This reflects risks to pace and affordability which are constraining delivery against planned timelines, including higher-than-anticipated…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"There has been no change to the schedule for the programme.","narrativeClaimKind":null}],"previous":{"id":"DLUHC_0250_2324-Q1","year":2025,"name":"Remediation Portfolio","department":"MHCLG","category":"Infrastructure and Construction","description":"The Remediation Portfolio’s overarching strategic objective is to bring all affected buildings over 11 metres with unsafe cladding up to the minimum life-safety standard quickly, completely, proportionately, and consistently. The objectives of the portfolio are to: fix buildings at pace, identify all affected buildings with unsafe cladding and ensure those responsible pay and protect the taxpayer. These objectives work with a set of four operating principles: support residents, deliver remediation to the right standards, deliver value for money and ensure remediation takes a risk-based approach. All funding for remediating buildings, over the Government’s capped £5.15bn contribution, will be recouped from industry.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Delivery confidence remains amber due to the need to accelerate the pace of remediation, progress developer debt recovery and implement the Building Safety Levy. As of April 2025, there are 5,052 residential buildings 11 metres and over in height identified with unsafe cladding with 1652 having completed remediation works. Identification of 11–18m buildings requiring remediation is continuing, with over 500 more 11-18m buildings monitored compared to a year ago. The portfolio has published performance targets and is delivering its Remediation Acceleration Plan, with a public update on progress and further interventions expected following the 2025 Spending Review this summer.","startDate":"2023-06-26","endDate":"2036-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2036. This is primarily due to the following factors‚ The end date remains at 31/03/203.","fyBaseline":517.3,"fyForecast":437.7,"fyVariance":15.39,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ There is underspend due to social/private sector costs in the Aluminium Composite Material (ACM) programme being reduced caused by late building completions and lower than expected starts in the Building Safety Fund (BSF) programme. Additional underspend due to staff costs savings in the ACM and BSF programmes, programme delays and supporting functions paying out less than expected for enforcement grants and lower legal costs.","wholeLifeCost":9915.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 9915. This is primarily due to the following factors‚ The modelled whole life cost of the portfolio has not been updated in this report due to uncertainty surrounding the Spending Review outcome. This forecast will be updated once the Spending Review outcome has been confirmed.","benefits":null,"benefitsNarrative":"Section 22 - Information intended for future publication","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Delivery confidence remains amber due to the need to accelerate the pace of remediation, progress developer debt recovery and implement the Building Safety Levy. As…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2036. This is primarily due to the following factors‚ The end date remains at 31/03/203.","narrativeClaimKind":null},"ratingDelta":1,"transition":"Worsened","endDateDeltaDays":0,"attentionScore":62,"attentionReasons":["Current published delivery confidence is Red","Published rating worsened from Amber to Red","In-year forecast variance is +5.3%"]},{"id":"DEFRA_0348_2324-Q4","year":2026,"name":"Livestock Information Transformation Programme","department":"DEFRA","category":"Government Transformation and Service Delivery","description":"The Livestock Information Transformation Programme (LITP) will replace multiple existing outdated tracing systems with a single, modern digital multi-species service. This service is essential to harness data to help protect English and UK food security, international trade, consumer confidence and prevent disruption to the farming industry. The programme will also deliver wider transformational effect across the livestock industry, through the exploitation of accurate data, subsequently promoting growth, improving efficiency and driving higher standards across the sector. These data opportunities will support transformation in the agriculture sector and will deliver government and industry-wide benefits. Upon completion of the programme's work, there will be a new multi-species system for tracing livestock, replacing existing legacy systems, using a cloud-based approach. Registration will be clearer and less complicated, the accessibility of services will be refined and will subsequently reduce errors and accelerate reporting, providing a better experience for keepers and the livestock industry. Users will be able to manage animal movements more coherently, and animal health and welfare will be improved through a UK View of livestock information.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25, the NISTA/SRO Delivery Confidence Assessment rating at 25/26 decreased to Red. Path to green plan approved by Ministers on 12 May 26.","startDate":null,"endDate":null,"scheduleNarrative":"Compared to financial year 24/25-Q4, the projects end date at 23/26 remained the same. This date is however subject to change due to replanning and path to green plan being refined.","fyBaseline":65.2,"fyForecast":63.77,"fyVariance":2.18,"varianceNarrative":"The budget variance is less than 5%","wholeLifeCost":525.5,"costNarrative":"Compared to financial year 24/25 - Q4, the projects departmentally agreed Whole Life Cost at 25/26-Q4 remained at £546,650","benefits":null,"benefitsNarrative":"Compared to the 2024/25 yearly return the projected departmentally agreed and quantified benefits have decreased from £107.8m to £56m. This is primarily due to refinement of economic modelling for programme business case 2. Since the OBC there has been significant progress in refining the approach to appraising the benefits of the preferred option. These changes, which were made to ensure the modelling is suitably robust, have caused benefits outputs to reduce since previous report. Changes include: Refinement of disease management modelling for ASF and FMD, complete redevelopment of BEID and efficiencies modelling, and removal of some existing monetised benefits where evidence was not sufficiently robust. The quantified benefits associated with LITP are predominantly comprised of disease management, industry efficiency, and government efficiency benefits over a 10 year appraisal period. Disease management benefits quantify the avoided economic losses associated with improved government disease response, driven by faster and more accurate traceability data. Quantified benefits are considered to be a significant underestimate of the true value of the programme: disease management benefits are only quantified for two diseases; other benefits are not quantified due to data limitations, for example the avoided cost of current system failure; and there are significant enabled benefits unlocked for other programmes which are not reflected in this analysis.","themes":["Cost & funding","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25, the NISTA/SRO Delivery Confidence Assessment rating at 25/26 decreased to Red. Path to green plan approved by Ministers on 12 May 26. Compared to financial year 24/25-Q4, the projects end date at 23/26 remained the same. This date is however subject to change due to replanning and path to green plan being refined.","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the projects end date at 23/26 remained the same. This date is however subject to change due to replanning and path to green plan being refined.","narrativeClaimKind":null,"history":[{"id":"DEFRA_0348_2324-Q4","year":2025,"name":"Livestock Information Transformation Programme","department":"DEFRA","category":"Government Transformation and Service Delivery","description":"The Livestock Information Transformation Programme (LITP) will replace multiple existing outdated tracing systems with a single, modern digital multi-species service. This service is essential to harness data to help protect English and UK food security, international trade, consumer confidence and prevent disruption to the farming industry. The programme will also deliver wider transformational effect across the livestock industry, through the exploitation of accurate data, subsequently promoting growth, improving efficiency and driving higher standards across the sector. These data opportunities will support transformation in the agriculture sector and will deliver government and industry-wide benefits. Upon completion of the programme’s work, there will be a new multi-species system for tracing livestock, replacing existing legacy systems, using a cloud-based approach. Registration will be clearer and less complicated, the accessibility of services will be refined and will subsequently reduce errors and accelerate reporting, providing a better experience for keepers and the livestock industry. Users will be able to manage animal movements more coherently, and animal health and welfare will be improved through a UK View of livestock information.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER. This is due to‚ LITPs overall delivery confidence remains AMBER. Recent and significant changes in delivery approach, planning, assurance and governance are starting to bear fruit, leading to increasing levels of confidence. Progress on core platform delivery remains on track for phased Beta roll-out starting in December 2025. The impending ministerial decision on eartag frequency in England will boost industry confidence and assist with legislative implementation. DA relationships continue to improve, with imminent key decisions on the Wales Multispecies system go-live informing LITP rollout strategy and timelines. Scotland have indicated that they would look to introduce Ultra-High Frequency technology for eartag identification and a ministerial announcement is expected soon. From a programme perspective, we will need to work through the implications of this at both a technical and legislative level to ensure that, regardless of eartag frequency, cross-border moves are dealt with coherently and a consistent UK View of movements is maintained. Implications arising from the ongoing EU SPS ‘dynamic alignment’ negotiations will also need to considered. New financial management arrangements are being implemented that are providing us with greater levels of assurance and control. Endorsement of our new delivery and business planning approach by Investment Committee has given us the mandate to push forward at pace. The draft first phase Programme Business Case is on track to start the assurance and approvals journey at LITP Programme Board in June. Work continues on the delivery of actions to address the recommendations outlined in the Chief Project Delivery Officer's internal review of the programme and the valuable guidance and insights provided by an independent NISTA associate. Further external assurance will be undertaken via the NISTA Gateway review scheduled for w/c 30 June. We continue to engage with ministers who have acknowledged the criticality of the programme, delivering on the original scope while meeting the direction to reduce costs later in the SR period. Setting up work with Core Defra to explore options around future asset control and data ownership that will be taken forward in the next year ahead.","startDate":"2022-01-25","endDate":null,"scheduleNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","fyBaseline":67.19,"fyForecast":72.4,"fyVariance":7.75,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ Funds brought forward from 26/27 to 24/25 for work on Mobile App and Graph technology for the Livestock Information Platform.","wholeLifeCost":478.08,"costNarrative":"The project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) is 478. This is primarily due to the following factors‚ This comprises Livestock Information Transformation Programme costs to replace existing outdated multi-species livestock tracing systems with a modern digital service, replacing existing legacy systems, using a cloud-based approach. This covers resource and capital costs for programme running costs, development and implementation of new IT digital services. This is as per captured in the Outline Business Case.","benefits":107.82,"benefitsNarrative":"The project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) is 107. This is primarily due to the following factors‚ The quantified benefits associated with the livestock information transformation programme (LITP) are predominantly comprised of disease management, industry efficiency, and government efficiency benefits over a 10 year appraisal period. Disease management benefits quantify the avoided economic losses associated with improved government disease response, driven by faster and more accurate traceability data. Quantified benefits are considered to be a significant underestimate of the true value of the programme: disease management benefits are only quantified for two diseases; other benefits are not quantified due to data limitations, for example the avoided cost of current system failure; and there are significant enabled benefits unlocked for other programmes which are not reflected in this analysis. Benefits analysis has been updated since the 24/25-Q4 return, latest figures will be reflected in the next commission.","themes":["Delivery & schedule","Governance & assurance","Technical & integration","Cost & funding"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER. This is due to‚ LITPs overall delivery confidence remains AMBER. Recent and significant changes in delivery approach, planning, assurance and governance are starting to bear fruit, leading to increasing levels of confidence. Progress on core platform delivery…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","narrativeClaimKind":null},{"id":"DEFRA_0348_2324-Q4","year":2026,"name":"Livestock Information Transformation Programme","department":"DEFRA","category":"Government Transformation and Service Delivery","description":"The Livestock Information Transformation Programme (LITP) will replace multiple existing outdated tracing systems with a single, modern digital multi-species service. This service is essential to harness data to help protect English and UK food security, international trade, consumer confidence and prevent disruption to the farming industry. The programme will also deliver wider transformational effect across the livestock industry, through the exploitation of accurate data, subsequently promoting growth, improving efficiency and driving higher standards across the sector. These data opportunities will support transformation in the agriculture sector and will deliver government and industry-wide benefits. Upon completion of the programme's work, there will be a new multi-species system for tracing livestock, replacing existing legacy systems, using a cloud-based approach. Registration will be clearer and less complicated, the accessibility of services will be refined and will subsequently reduce errors and accelerate reporting, providing a better experience for keepers and the livestock industry. Users will be able to manage animal movements more coherently, and animal health and welfare will be improved through a UK View of livestock information.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25, the NISTA/SRO Delivery Confidence Assessment rating at 25/26 decreased to Red. Path to green plan approved by Ministers on 12 May 26.","startDate":null,"endDate":null,"scheduleNarrative":"Compared to financial year 24/25-Q4, the projects end date at 23/26 remained the same. This date is however subject to change due to replanning and path to green plan being refined.","fyBaseline":65.2,"fyForecast":63.77,"fyVariance":2.18,"varianceNarrative":"The budget variance is less than 5%","wholeLifeCost":525.5,"costNarrative":"Compared to financial year 24/25 - Q4, the projects departmentally agreed Whole Life Cost at 25/26-Q4 remained at £546,650","benefits":null,"benefitsNarrative":"Compared to the 2024/25 yearly return the projected departmentally agreed and quantified benefits have decreased from £107.8m to £56m. This is primarily due to refinement of economic modelling for programme business case 2. Since the OBC there has been significant progress in refining the approach to appraising the benefits of the preferred option. These changes, which were made to ensure the modelling is suitably robust, have caused benefits outputs to reduce since previous report. Changes include: Refinement of disease management modelling for ASF and FMD, complete redevelopment of BEID and efficiencies modelling, and removal of some existing monetised benefits where evidence was not sufficiently robust. The quantified benefits associated with LITP are predominantly comprised of disease management, industry efficiency, and government efficiency benefits over a 10 year appraisal period. Disease management benefits quantify the avoided economic losses associated with improved government disease response, driven by faster and more accurate traceability data. Quantified benefits are considered to be a significant underestimate of the true value of the programme: disease management benefits are only quantified for two diseases; other benefits are not quantified due to data limitations, for example the avoided cost of current system failure; and there are significant enabled benefits unlocked for other programmes which are not reflected in this analysis.","themes":["Cost & funding","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25, the NISTA/SRO Delivery Confidence Assessment rating at 25/26 decreased to Red. Path to green plan approved by Ministers on 12 May 26. Compared to financial year 24/25-Q4, the projects end date at 23/26 remained the same. This date is however subject to change due to replanning and path to green plan being refined.","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the projects end date at 23/26 remained the same. This date is however subject to change due to replanning and path to green plan being refined.","narrativeClaimKind":null}],"previous":{"id":"DEFRA_0348_2324-Q4","year":2025,"name":"Livestock Information Transformation Programme","department":"DEFRA","category":"Government Transformation and Service Delivery","description":"The Livestock Information Transformation Programme (LITP) will replace multiple existing outdated tracing systems with a single, modern digital multi-species service. This service is essential to harness data to help protect English and UK food security, international trade, consumer confidence and prevent disruption to the farming industry. The programme will also deliver wider transformational effect across the livestock industry, through the exploitation of accurate data, subsequently promoting growth, improving efficiency and driving higher standards across the sector. These data opportunities will support transformation in the agriculture sector and will deliver government and industry-wide benefits. Upon completion of the programme’s work, there will be a new multi-species system for tracing livestock, replacing existing legacy systems, using a cloud-based approach. Registration will be clearer and less complicated, the accessibility of services will be refined and will subsequently reduce errors and accelerate reporting, providing a better experience for keepers and the livestock industry. Users will be able to manage animal movements more coherently, and animal health and welfare will be improved through a UK View of livestock information.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER. This is due to‚ LITPs overall delivery confidence remains AMBER. Recent and significant changes in delivery approach, planning, assurance and governance are starting to bear fruit, leading to increasing levels of confidence. Progress on core platform delivery remains on track for phased Beta roll-out starting in December 2025. The impending ministerial decision on eartag frequency in England will boost industry confidence and assist with legislative implementation. DA relationships continue to improve, with imminent key decisions on the Wales Multispecies system go-live informing LITP rollout strategy and timelines. Scotland have indicated that they would look to introduce Ultra-High Frequency technology for eartag identification and a ministerial announcement is expected soon. From a programme perspective, we will need to work through the implications of this at both a technical and legislative level to ensure that, regardless of eartag frequency, cross-border moves are dealt with coherently and a consistent UK View of movements is maintained. Implications arising from the ongoing EU SPS ‘dynamic alignment’ negotiations will also need to considered. New financial management arrangements are being implemented that are providing us with greater levels of assurance and control. Endorsement of our new delivery and business planning approach by Investment Committee has given us the mandate to push forward at pace. The draft first phase Programme Business Case is on track to start the assurance and approvals journey at LITP Programme Board in June. Work continues on the delivery of actions to address the recommendations outlined in the Chief Project Delivery Officer's internal review of the programme and the valuable guidance and insights provided by an independent NISTA associate. Further external assurance will be undertaken via the NISTA Gateway review scheduled for w/c 30 June. We continue to engage with ministers who have acknowledged the criticality of the programme, delivering on the original scope while meeting the direction to reduce costs later in the SR period. Setting up work with Core Defra to explore options around future asset control and data ownership that will be taken forward in the next year ahead.","startDate":"2022-01-25","endDate":null,"scheduleNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","fyBaseline":67.19,"fyForecast":72.4,"fyVariance":7.75,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ Funds brought forward from 26/27 to 24/25 for work on Mobile App and Graph technology for the Livestock Information Platform.","wholeLifeCost":478.08,"costNarrative":"The project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) is 478. This is primarily due to the following factors‚ This comprises Livestock Information Transformation Programme costs to replace existing outdated multi-species livestock tracing systems with a modern digital service, replacing existing legacy systems, using a cloud-based approach. This covers resource and capital costs for programme running costs, development and implementation of new IT digital services. This is as per captured in the Outline Business Case.","benefits":107.82,"benefitsNarrative":"The project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) is 107. This is primarily due to the following factors‚ The quantified benefits associated with the livestock information transformation programme (LITP) are predominantly comprised of disease management, industry efficiency, and government efficiency benefits over a 10 year appraisal period. Disease management benefits quantify the avoided economic losses associated with improved government disease response, driven by faster and more accurate traceability data. Quantified benefits are considered to be a significant underestimate of the true value of the programme: disease management benefits are only quantified for two diseases; other benefits are not quantified due to data limitations, for example the avoided cost of current system failure; and there are significant enabled benefits unlocked for other programmes which are not reflected in this analysis. Benefits analysis has been updated since the 24/25-Q4 return, latest figures will be reflected in the next commission.","themes":["Delivery & schedule","Governance & assurance","Technical & integration","Cost & funding"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER. This is due to‚ LITPs overall delivery confidence remains AMBER. Recent and significant changes in delivery approach, planning, assurance and governance are starting to bear fruit, leading to increasing levels of confidence. Progress on core platform delivery…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","narrativeClaimKind":null},"ratingDelta":1,"transition":"Worsened","endDateDeltaDays":null,"attentionScore":60,"attentionReasons":["Current published delivery confidence is Red","Published rating worsened from Amber to Red"]},{"id":"MOD_0320_2324-Q3","year":2026,"name":"MULTI ROLE STRIKE SHIP","department":"MOD","category":"Military Capability","description":"The Programme will provide Littoral Lift Capabilities to replace the current ageing mixed fleet of amphibious vessels in the early 2030s, as well as potentially performing additional roles currently conducted by other warships and auxiliaries. These vessels will enable the projection of littoral strike capability worldwide and ensure that a modernised amphibious capability is available to the Commando Force.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 decreased to Red. This is primarily due to the following factors. 1. Following submission of the Outline Business Case to the Navy Investment Decision Panel, the decision was taken for a Programme pause and reset, to await the formal outcomes of the Defence Investment Plan and to determine the best approach to delivering the littoral lift capability within a reduced budgetary total. 2. The change to the Programme Total Cost, and Defence Investment Plan uncertainty has lead to a Red assessment.","startDate":"2024-04-01","endDate":"2040-01-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 31/01/2040. The programme will be reset during FY26.","fyBaseline":11.2,"fyForecast":null,"fyVariance":null,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. 1. The Variance between budget and forecast in the current year and future years is subject to a programme reset and re-baselined IOC date.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Approvals & decisions","Scope & requirements","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 decreased to Red. This is primarily due to the following factors. 1. Following submission of the Outline Business Case to the Navy Investment Decision Panel, the decision was taken for a Programme pause and reset, to await the formal outcomes of the…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 31/01/2040. The programme will be reset during FY26.","narrativeClaimKind":null,"history":[{"id":"MOD_0320_2324-Q3","year":2024,"name":"Multi Role Support Ship","department":"MOD","category":"Military Capability","description":"The Multi-Role Support Ship (MRSS) programme will replace the current ageing mixed fleet of amphibious vessels in the early 2030s, as well as potentially performing additional roles currently conducted by other warships and auxiliaries. These vessels will enable the projection of littoral strike capability worldwide and ensure that a modernised amphibious capability is available to the Commando Force. The MRSS capability will be persistently engaged as Littoral Response Groups operating in both the Indo Pacific and Euro Atlantic regions, and will be ready to aggregate to form a larger Littoral Strike Group or be combined with a Carrier Task Group to form an Expeditionary Strike Force.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. The scale, complexity and challenge of the Programme. The Programme was established in 2023 and is currently moving from the concept to assessment phase. The programme team are undertaking evidence gathering in order to make decisions around the route to commercial competition.","startDate":"2023-07-01","endDate":"2040-01-31","scheduleNarrative":"The project's end-date at 23/24-Q4 is 2040-01-31. This is primarily due to the following factors. With scope and solution design still to be finalised, the full cost model and schedule is still to be finalised.","fyBaseline":1.0,"fyForecast":1.0,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.)","benefits":0.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 0m.","themes":["Commercial & supply chain","Cost & funding","Delivery & schedule","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. The scale, complexity and challenge of the Programme. The Programme was established in 2023 and is currently moving from the concept to assessment phase. The programme team are…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 23/24-Q4 is 2040-01-31. This is primarily due to the following factors. With scope and solution design still to be finalised, the full cost model and schedule is still to be finalised.","narrativeClaimKind":null},{"id":"MOD_0320_2324-Q3","year":2025,"name":"MULTI ROLE STRIKE SHIP","department":"MoD","category":"Military Capability","description":"The Multi-Role Strike Ship (MRSS) programme will replace the current ageing mixed fleet of amphibious vessels in the early 2030s, as well as potentially performing additional roles currently conducted by other warships and auxiliaries. These vessels will enable the projection of littoral strike capability worldwide and ensure that a modernised amphibious capability is available to the Commando Force.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER, compared with the project's assessment last year of AMBER. This is due to the following factors. While there have been improvements across Programme Governance, Resources and Working Practices, this remains a complex and challenging Programme with appropriate levels of risk and uncertainty at this stage (Concept Phase). To improve delivery confidence, the Programme Team are undertaking evidence gathering in order to make informed decisions around options and the route to commercial competition.","startDate":"2024-04-01","endDate":null,"scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/01/2040. This is primarily due to the following factors. The end date is based on the current deterministic In Service Dates for the six MRSS. This date will be reviewed and updated as part of the Outline Business Case submission in Q3-25, informed by an increased understanding of the commercial strategy and outcomes from the Strategic Defence Review.","fyBaseline":26.04,"fyForecast":4.38,"fyVariance":83.18,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The in-year budget is currently showing the Strategic Outline Case (July 2023) Annual Budget Cycle (ABC) figures which remain extant at 26.042M, but while MRSS is in the Concept Phase the actual approval is limited to a Standing Approval of £10M for which the In-Year Forecast spend is £4.379M therefore showing an artificial under-spend.","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Approvals & decisions","Commercial & supply chain","Delivery & schedule"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER, compared with the project's assessment last year of AMBER. This is due to the following factors. While there have been improvements across Programme Governance, Resources and Working Practices, this remains a complex and challenging Programme with appropriate…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/01/2040. This is primarily due to the following factors. The end date is based on the current deterministic In Service Dates for the six MRSS. This date will be reviewed and updated as part of the Outline Business Case submission in Q3-25, informed by an increased understanding of the commercial strategy and outcomes from the Strategic Defence Review.","narrativeClaimKind":null},{"id":"MOD_0320_2324-Q3","year":2026,"name":"MULTI ROLE STRIKE SHIP","department":"MOD","category":"Military Capability","description":"The Programme will provide Littoral Lift Capabilities to replace the current ageing mixed fleet of amphibious vessels in the early 2030s, as well as potentially performing additional roles currently conducted by other warships and auxiliaries. These vessels will enable the projection of littoral strike capability worldwide and ensure that a modernised amphibious capability is available to the Commando Force.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 decreased to Red. This is primarily due to the following factors. 1. Following submission of the Outline Business Case to the Navy Investment Decision Panel, the decision was taken for a Programme pause and reset, to await the formal outcomes of the Defence Investment Plan and to determine the best approach to delivering the littoral lift capability within a reduced budgetary total. 2. The change to the Programme Total Cost, and Defence Investment Plan uncertainty has lead to a Red assessment.","startDate":"2024-04-01","endDate":"2040-01-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 31/01/2040. The programme will be reset during FY26.","fyBaseline":11.2,"fyForecast":null,"fyVariance":null,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. 1. The Variance between budget and forecast in the current year and future years is subject to a programme reset and re-baselined IOC date.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Approvals & decisions","Scope & requirements","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 decreased to Red. This is primarily due to the following factors. 1. Following submission of the Outline Business Case to the Navy Investment Decision Panel, the decision was taken for a Programme pause and reset, to await the formal outcomes of the…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 31/01/2040. The programme will be reset during FY26.","narrativeClaimKind":null}],"previous":{"id":"MOD_0320_2324-Q3","year":2025,"name":"MULTI ROLE STRIKE SHIP","department":"MoD","category":"Military Capability","description":"The Multi-Role Strike Ship (MRSS) programme will replace the current ageing mixed fleet of amphibious vessels in the early 2030s, as well as potentially performing additional roles currently conducted by other warships and auxiliaries. These vessels will enable the projection of littoral strike capability worldwide and ensure that a modernised amphibious capability is available to the Commando Force.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER, compared with the project's assessment last year of AMBER. This is due to the following factors. While there have been improvements across Programme Governance, Resources and Working Practices, this remains a complex and challenging Programme with appropriate levels of risk and uncertainty at this stage (Concept Phase). To improve delivery confidence, the Programme Team are undertaking evidence gathering in order to make informed decisions around options and the route to commercial competition.","startDate":"2024-04-01","endDate":null,"scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/01/2040. This is primarily due to the following factors. The end date is based on the current deterministic In Service Dates for the six MRSS. This date will be reviewed and updated as part of the Outline Business Case submission in Q3-25, informed by an increased understanding of the commercial strategy and outcomes from the Strategic Defence Review.","fyBaseline":26.04,"fyForecast":4.38,"fyVariance":83.18,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The in-year budget is currently showing the Strategic Outline Case (July 2023) Annual Budget Cycle (ABC) figures which remain extant at 26.042M, but while MRSS is in the Concept Phase the actual approval is limited to a Standing Approval of £10M for which the In-Year Forecast spend is £4.379M therefore showing an artificial under-spend.","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Approvals & decisions","Commercial & supply chain","Delivery & schedule"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER, compared with the project's assessment last year of AMBER. This is due to the following factors. While there have been improvements across Programme Governance, Resources and Working Practices, this remains a complex and challenging Programme with appropriate…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/01/2040. This is primarily due to the following factors. The end date is based on the current deterministic In Service Dates for the six MRSS. This date will be reviewed and updated as part of the Outline Business Case submission in Q3-25, informed by an increased understanding of the commercial strategy and outcomes from the Strategic Defence Review.","narrativeClaimKind":null},"ratingDelta":1,"transition":"Worsened","endDateDeltaDays":null,"attentionScore":60,"attentionReasons":["Current published delivery confidence is Red","Published rating worsened from Amber to Red"]},{"id":"DHSC_0041_2122-Q3","year":2026,"name":"Future NHS Workforce Solution Transformation Programme","department":"DHSC","category":"Information and Communications Technology (ICT)","description":"The Electronic Staff Record is a single workforce management tool for the NHS offering an \"end to end\" solution during NHS employment. ESR provides salary payments and other pay related remuneration to over 1.9 million employees, circa 5% of the working population in England and Wales. The Programme will deliver a transformed workforce solution for the NHS. The primary drivers are: - Expiry of the current contract for the provision of ESR in August 2026 (extension from August 2025 - August 2026 to facilitate an appropriate transition window; enabling the safe take on of the existing service by the supplier of the new agreement); - The end of premium support for the Oracle eBS software from 2035; - The need to transform the existing solution to provide a modernised digital service to end users coupled with the accurate and timely provision of workforce data.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Exempt under Section 43 - Commercial interests","startDate":"2020-01-02","endDate":"2031-02-28","scheduleNarrative":"Exempt under Section 43 - Commercial interests","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":16891.12,"benefitsNarrative":"Compared to financial year 2024/25-Q4, the project’s departmentally agreed benefits have increased. This is because the programme’s benefits case has been refined, and an updated position was included in the Full Business Case (FBC), which was approved in September 2025. This approval established a new baseline. Both cash-releasing and non-cash-releasing benefits will be realised by user organisations. These benefits primarily relate to: User experience Interoperability Data insights They represent incremental improvements on top of the existing benefits delivered by the current ESR service solution.","themes":["Commercial & supply chain"],"evidenceExcerpt":"Exempt under Section 43 - Commercial interests Exempt under Section 43 - Commercial interests","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 43 - Commercial interests","narrativeClaimKind":null,"history":[{"id":"DHSC_0041_2122-Q3","year":2022,"name":"ESR Transformation Programme","department":"DHSC","category":"ICT","description":"The Electronic Staff Record is a single workforce management tool for the NHS offering an 'end to end' solution during NHS employment. ESR provides salary payments and other pay related remuneration to 1.8 million employees, circa 5% of the working population in England and Wales. The Programme will define and deliver the future transformation roadmap for the ESR service from August 2025 including technology, application and service design. The primary drivers are: - Expiry of the current contract for the provision of ESR in August 2025; - The end of premium support for the Oracle eBS software in 2032; - The need to transform the existing solution to provide a modernised digital service to end users coupled with real-time system interoperability leading to the accurate and timely provision of workforce data. - Align ESR to national Programmes and initiatives such as NHS England Future of HR & OD Programme and NHS Wales Health and Care Workforce Strategy.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 is Amber The SRO has accepted the recommendations received as part of the Stage Gate 2 Review held in March 2022 and an action plan has been put in place to address the recommendations as required.","startDate":"2020-01-02","endDate":"2031-02-28","scheduleNarrative":"Your project end-date is 28 FEB 2031. This is primarily due to the following factors: The main driver for the project end date is the need to complete transformation and migration to the new workforce solution across all in-scope organizations before the expiry of the existing legacy product in 2032.","fyBaseline":3.04,"fyForecast":2.44,"fyVariance":-20.0,"varianceNarrative":"The budget variance exceeds 5%. The variance represents the underspend in 2021/2022 of 0.6m as a result of completing the Discovery activities which have informed next steps for the programme. As a result of the Discovery findings a change of approach was implemented which resulted in reprofile of spend from 2021/2022 to 2022/2023 and this is captured in v2.0 of the OBC","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"","themes":["Commercial & supply chain","Cost & funding","Governance & assurance","Delivery & schedule"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 is Amber The SRO has accepted the recommendations received as part of the Stage Gate 2 Review held in March 2022 and an action plan has been put in place to address the recommendations as required. Your project end-date is 28 FEB 2031. This is primarily due to the…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Your project end-date is 28 FEB 2031. This is primarily due to the following factors: The main driver for the project end date is the need to complete transformation and migration to the new workforce solution across all in-scope organizations before the expiry of the existing legacy product in 2032.","narrativeClaimKind":null},{"id":"DHSC_0041_2122-Q3","year":2023,"name":"ESR Transformation Programme","department":"DHSC","category":"ICT","description":"The Electronic Staff Record is a single workforce management tool for the NHS offering an end to end solution during NHS employment. ESR provides salary payments and other pay related remuneration to 1.8 million employees, circa 5% of the working population in England and Wales. The Programme will define and deliver the future transformation roadmap for the ESR service from August 2025 including technology, application and service design. The primary drivers are: - Expiry of the current contract for the provision of ESR in August 2025; - The end of premium support for the Oracle eBS software in 2033; - The need to transform the existing solution to provide a modernised digital service to end users coupled with the accurate and timely provision of workforce data.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber (SRO rating). This is primarily due to the following factors. The SRO has accepted the recommendations received as part of the Stage Gate 2 Review held in March 2022 and an action plan has been put in place to address the recommendations as required.","startDate":"2020-01-02","endDate":"2031-02-28","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2031-02-28. This is primarily due to the following factors. The main driver for the project end date is the need to complete transformation and migration to the new workforce solution across all in-scope organisations before the expiry of the existing legacy product in 2033.","fyBaseline":12.19,"fyForecast":6.47,"fyVariance":-47.0,"varianceNarrative":"The programme has underspent in the 2022/23 financial year due to slippage in the programme schedule including approval of the OBC taking longer than planned, extension of the timeline for submission of Supplier Questionnaires in order to maximise the opportunity for supplier submissions and a commercial issue impacting on the issuing of the Invitation to Submit Initial Tenders. The impact to programme timelines have required significant reprofiling of budget assumptions. Work to reprofile costs for future years within the existing funding envelope has been undertaken. Forecasted figures for 23/24 have been updated accordingly.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":3449.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 3449m. The project's departmental-agree monetised benefits at 22/23-Q4 is 3449m.The project's departmental-agree monetised benefits at 22/23-Q4 is 3449m.The project's departmental-agree monetised benefits at 22/23-Q4 is 3449m. Both cash releasing and non-cash releasing benefits are realised by user organisations and are broadly related to user experience, interoperability, and data insights. These are incremental benefits on top of the established benefits from the existing ESR service solution.","themes":["Commercial & supply chain","Cost & funding","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber (SRO rating). This is primarily due to the following factors. The SRO has accepted the recommendations received as part of the Stage Gate 2 Review held in March 2022 and an action plan has been put in place to address the recommendations as required.…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2031-02-28. This is primarily due to the following factors. The main driver for the project end date is the need to complete transformation and migration to the new workforce solution across all in-scope organisations before the expiry of the existing legacy product in 2033.","narrativeClaimKind":null},{"id":"DHSC_0041_2122-Q3","year":2024,"name":"ESR Transformation Programme","department":"DHSC","category":"ICT","description":"The Electronic Staff Record is a single workforce management tool for the NHS offering an \"end to end\" solution during NHS employment. ESR provides salary payments and other pay related remuneration to 1.8 million employees, circa 5% of the working population in England and Wales. The Programme will define and deliver the future transformation roadmap for the ESR service from Spring 2026 including technology, application and service design. _x000D_ The primary drivers are:_x000D_ - Expiry of the current contract for the provision of ESR in August 2026 (extension from August 2025 - August 2026 to facilitate an appropriate transition window; enabling the safe take on of the existing service by the supplier of the new agreement);_x000D_ - The end of premium support for the Oracle eBS software in 2034;_x000D_ - The need to transform the existing solution to provide a modernised digital service to end users coupled with the accurate and timely provision of workforce data.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber(IPA rating). This is primarily due to the following factors. The SRO has accepted the recommendations received as part of the IPA Annual Assurance Review held in February 2024. An action plan has been put in place to address the recommendations as required with updates provided to Programme Board on a monthly basis.","startDate":"2020-01-02","endDate":"2031-02-28","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2031-02-28. This is primarily due to the following factors. The main driver for the project end date remains aligned with the need to complete transformation and migration to the new workforce solution across all in-scope organisations before the expiry of the existing legacy product.","fyBaseline":7.13,"fyForecast":6.46,"fyVariance":-9.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. On 26th February 2024, notification was formally received from the DHSC Investment Team that the OBC Addendum in relation to the incumbent supplier contract extension for the ESR Transformation Programme had been approved by DHSC Investment Committee, Ministers and HMT. Due to previously reported delays, securing an incumbent extension option was progressed as a mitigation to ensure there is an appropriate transition window for the selected supplier to safely take on the running of the existing service. Following the OBC addendum approval, the baseline and forecast figures have been reprofiled. A minimal underspend is forecast, with Q4 figures in the process of being finalised.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":3373.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 2324-Q4 decreased from 3449m. to 3373m. Both cash releasing and non-cash releasing benefits are realised by user organisations and are broadly related to user experience, interoperability, and data insights. These are incremental benefits on top of the established benefits from the existing ESR service solution.","themes":["Commercial & supply chain","Governance & assurance","Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber(IPA rating). This is primarily due to the following factors. The SRO has accepted the recommendations received as part of the IPA Annual Assurance Review held in February 2024. An action plan has been put in place to address the recommendations as…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2031-02-28. This is primarily due to the following factors. The main driver for the project end date remains aligned with the need to complete transformation and migration to the new workforce solution across all in-scope organisations before the expiry of the existing legacy product.","narrativeClaimKind":null},{"id":"DHSC_0041_2122-Q3","year":2025,"name":"Future NHS Workforce Solution Transformation Programme","department":"DHSC","category":"ICT","description":"The Electronic Staff Record is a single workforce management tool for the NHS offering an end to end solution during NHS employment. ESR provides salary payments and other pay related remuneration to over 1.9 million employees, circa 5% of the working population in England and Wales. The Programme will deliver a transformed workforce solution for the NHS. The primary drivers are: - Expiry of the current contract for the provision of ESR in August 2026 (extension from August 2025 - August 2026 to facilitate an appropriate transition window; enabling the safe take on of the existing service by the supplier of the new agreement); - The end of premium support for the Oracle eBS software from 2035; - The need to transform the existing solution to provide a modernised digital service to end users coupled with the accurate and timely provision of workforce data.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors‚ the comprehensive action plan put in place to address recommendations coming out of February 2024 NISTA Annual Assurance Review; and milestones for the pilot and subsequent implementation are on track.","startDate":"2020-11-23","endDate":"2031-01-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 decreased from 28/02/2031 to 31/01/2031. This is primarily due to the following factors‚ The main driver for the project end date remains aligned with the need to complete transformation and migration to the new workforce solution across all in-scope organisations before the expiry of the existing legacy product.","fyBaseline":16.41,"fyForecast":9.95,"fyVariance":39.37,"varianceNarrative":"The budget variance exceeds 5%. The budget variance exceeds 5%. This is primarily due to previously reported slippage with the critical path in the procurement project, the FBC development and approval will not conclude in this financial year, therefore activity must continue into 25/26 to conclude the procurement and produce the FBC.","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":3372.57,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) decreased from 3373 to 3372. This is primarily due to the following factors‚ Both cash releasing and non-cash releasing benefits are realised by user organisations and are broadly related to user experience, interoperability, and data insights. These are incremental benefits on top of the established benefits from the existing ESR service solution. The reported reduction is simply due to rounding.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors‚ the comprehensive action plan put in place to address recommendations coming out of February 2024 NISTA Annual Assurance Review; and milestones for the…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 decreased from 28/02/2031 to 31/01/2031. This is primarily due to the following factors‚ The main driver for the project end date remains aligned with the need to complete transformation and migration to the new workforce solution across all in-scope organisations before the expiry of the existing legacy product.","narrativeClaimKind":null},{"id":"DHSC_0041_2122-Q3","year":2026,"name":"Future NHS Workforce Solution Transformation Programme","department":"DHSC","category":"Information and Communications Technology (ICT)","description":"The Electronic Staff Record is a single workforce management tool for the NHS offering an \"end to end\" solution during NHS employment. ESR provides salary payments and other pay related remuneration to over 1.9 million employees, circa 5% of the working population in England and Wales. The Programme will deliver a transformed workforce solution for the NHS. The primary drivers are: - Expiry of the current contract for the provision of ESR in August 2026 (extension from August 2025 - August 2026 to facilitate an appropriate transition window; enabling the safe take on of the existing service by the supplier of the new agreement); - The end of premium support for the Oracle eBS software from 2035; - The need to transform the existing solution to provide a modernised digital service to end users coupled with the accurate and timely provision of workforce data.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Exempt under Section 43 - Commercial interests","startDate":"2020-01-02","endDate":"2031-02-28","scheduleNarrative":"Exempt under Section 43 - Commercial interests","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":16891.12,"benefitsNarrative":"Compared to financial year 2024/25-Q4, the project’s departmentally agreed benefits have increased. This is because the programme’s benefits case has been refined, and an updated position was included in the Full Business Case (FBC), which was approved in September 2025. This approval established a new baseline. Both cash-releasing and non-cash-releasing benefits will be realised by user organisations. These benefits primarily relate to: User experience Interoperability Data insights They represent incremental improvements on top of the existing benefits delivered by the current ESR service solution.","themes":["Commercial & supply chain"],"evidenceExcerpt":"Exempt under Section 43 - Commercial interests Exempt under Section 43 - Commercial interests","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 43 - Commercial interests","narrativeClaimKind":null}],"previous":{"id":"DHSC_0041_2122-Q3","year":2025,"name":"Future NHS Workforce Solution Transformation Programme","department":"DHSC","category":"ICT","description":"The Electronic Staff Record is a single workforce management tool for the NHS offering an end to end solution during NHS employment. ESR provides salary payments and other pay related remuneration to over 1.9 million employees, circa 5% of the working population in England and Wales. The Programme will deliver a transformed workforce solution for the NHS. The primary drivers are: - Expiry of the current contract for the provision of ESR in August 2026 (extension from August 2025 - August 2026 to facilitate an appropriate transition window; enabling the safe take on of the existing service by the supplier of the new agreement); - The end of premium support for the Oracle eBS software from 2035; - The need to transform the existing solution to provide a modernised digital service to end users coupled with the accurate and timely provision of workforce data.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors‚ the comprehensive action plan put in place to address recommendations coming out of February 2024 NISTA Annual Assurance Review; and milestones for the pilot and subsequent implementation are on track.","startDate":"2020-11-23","endDate":"2031-01-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 decreased from 28/02/2031 to 31/01/2031. This is primarily due to the following factors‚ The main driver for the project end date remains aligned with the need to complete transformation and migration to the new workforce solution across all in-scope organisations before the expiry of the existing legacy product.","fyBaseline":16.41,"fyForecast":9.95,"fyVariance":39.37,"varianceNarrative":"The budget variance exceeds 5%. The budget variance exceeds 5%. This is primarily due to previously reported slippage with the critical path in the procurement project, the FBC development and approval will not conclude in this financial year, therefore activity must continue into 25/26 to conclude the procurement and produce the FBC.","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":3372.57,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) decreased from 3373 to 3372. This is primarily due to the following factors‚ Both cash releasing and non-cash releasing benefits are realised by user organisations and are broadly related to user experience, interoperability, and data insights. These are incremental benefits on top of the established benefits from the existing ESR service solution. The reported reduction is simply due to rounding.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors‚ the comprehensive action plan put in place to address recommendations coming out of February 2024 NISTA Annual Assurance Review; and milestones for the…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 decreased from 28/02/2031 to 31/01/2031. This is primarily due to the following factors‚ The main driver for the project end date remains aligned with the need to complete transformation and migration to the new workforce solution across all in-scope organisations before the expiry of the existing legacy product.","narrativeClaimKind":null},"ratingDelta":1,"transition":"Worsened","endDateDeltaDays":28,"attentionScore":59,"attentionReasons":["Current published delivery confidence is Amber","Published rating worsened from Green to Amber","Published end date moved 28 days later","In-year forecast variance is +43.0%"]},{"id":"MOD_0137_2122-Q1","year":2026,"name":"EUROPEAN COMMON RADAR SYSTEM MK 2","department":"MOD","category":"Military Capability","description":"The Phase 4 Enhancement (P4E) to the Typhoon aircraft includes upgrades to mission management systems, GPS resilience and navigational precision. It also provides the vehicle for the integration of the European Common Radar System (ECRS) Mk2 onto the aircraft. The radar is being developed to enable the aircraft to simultaneously detect, identify and track various targets on land and in the air and is vital to maintain Typhoon’s control of the air. It also provides a new Electronic Warfare capability and sustains Typhoon capability to operate in contested and congested Electromagnetic environments. The programme is being delivered via multiple interdependent contracts. Radar development is being led nationally by the UK, whereas the wider P4E changes to the aircraft systems are being developed with the other Typhoon Partner Nations as part of the international Eurofighter Programme.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors. 1. The overall radar design schedule has stabilised and has successfully moved into the manufacture phase with confidence growing on production radars being available in 2028 as planned. However, securing an acceptable delivery schedule for P4E from Eurofighter through the NATO Eurofighter and Tornado Management Agency (NETMA), which is essential to embodying the radar, remains a significant challenge for the UK and Partner Nations. 2. Whilst P4E content has been agreed, Partner Nations are working continually with NETMA and Eurofighter to establish a progressive release of capability which meets each nation's operational need without being detrimental to delivery of the overall programme, alongside extensive transformation being pursued within the NETMA and Eurofighter enterprises.","startDate":"2019-02-01","endDate":"2034-12-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 01/08/2032.","fyBaseline":263.95,"fyForecast":303.89,"fyVariance":15.13,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors: 1. The overspend is the result of the reprofiling of P4E Long Lead Time activities and ECRS Mk2 production into FY25/26 to ensure the critical path is maintained.","wholeLifeCost":2899.01,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) increased from £2902M to £2930M. This is primarily due to the following factors. 1. Minimal cost growth, principally down to increased Typhoon Defensive Aids Sub-System scope/requirements within P4E. 2. The Programme remains within its Approved Budgetary Level.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Delivery & schedule","Scope & requirements","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors. 1. The overall radar design schedule has stabilised and has successfully moved into the manufacture phase with confidence growing on production radars being available in 2028 as…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":true,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 01/08/2032.","narrativeClaimKind":"date-mismatch","history":[{"id":"MOD_0137_2122-Q1","year":2022,"name":"European Common Radar System Mk 2","department":"MOD","category":"Military Capability","description":"The aim of the programme is to develop and integrate a world-class radar system which will keep RAF Typhoon, UK industry and Eurofighter exports at the forefront of military capability development and delivery. The European Common Radar System Mark 2 will be an Active Electronically Scanned Array as an upgrade from the current mechanically scanned sensor. In addition to a step-change improvement to traditional radar functions, this will give UK Typhoons a state-of-the-art Electronic Warfare capability including wide band Electronic Attack, essential in securing Control of the Air beyond 2030. European Common Radar System Mk2 investment sustains a highly specialised, world-leading UK industry base and ensures advanced technical skills and expertise in complex sensors are available for the Future Combat Air System programme. Delivering European Common Radar System Mk2 into service demonstrates the UK's cutting-edge technological capabilities and builds international confidence in UK industrial capability. Integrating European Common Radar System Mk2 onto Typhoon ensures that it remains competitive for winning new export orders and provides a substantial revenue stream for UK industry from retrofitting the radar onto current Typhoon export customers' aircraft.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber. This is primarily due to the following factors: This reflects the assessment made in November 21 after the affordability of the programme was demonstrated in the Phase 4 Enhancement/European Common Radar System Mk2 Full Business Case which received MOD approval in Dec 2021 and Her Majesty's Treasury approval in Mar 2022.","startDate":"2019-02-01","endDate":"2040-01-01","scheduleNarrative":"The project end-date is 01 January 2040. This is primarily due to the following factors: The Programme entered the Government Major Projects Portfolio in Financial Year 2021/22, as such there is no baseline date recorded for March 21 for comparison.","fyBaseline":192.47,"fyForecast":154.17,"fyVariance":-21.0,"varianceNarrative":"The budget variance exceeds 5%. Variance is a £38.301M (or 20%) underspend against the In-Year budget. This is principally the result of fluctuation in Foreign Exchange Rates, contractor performance slippage (particularly on the Long Lead Time Activity 5b project); and delay to the B Model Multicore Processor and Receiver Milestones.","wholeLifeCost":565.0,"costNarrative":"The projects Baseline Whole Life Costs is 565.21 (£M). This is primarily due to the following factors: The current Whole Life Costs reflect the Long Lead Time Activity 5b project finances only. The Phase 4 Enhancement/European Common Radar System Full Business Case Approved Budgetary Level of £2,352M is not yet recorded.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Commercial & supply chain"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber. This is primarily due to the following factors: This reflects the assessment made in November 21 after the affordability of the programme was demonstrated in the Phase 4 Enhancement/European Common Radar System Mk2 Full Business Case which received MOD approval in Dec…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project end-date is 01 January 2040. This is primarily due to the following factors: The Programme entered the Government Major Projects Portfolio in Financial Year 2021/22, as such there is no baseline date recorded for March 21 for comparison.","narrativeClaimKind":null},{"id":"MOD_0137_2122-Q1","year":2023,"name":"European Common Radar System Mk 2","department":"MOD","category":"Military Capability","description":"The Phase 4 Enhancement (P4E) to the Typhoon aircraft includes upgrades to mission management systems, GPS resilience and navigational precision. It also provides the vehicle for the integration of the European Common Radar System Mk2 onto the aircraft. The radar is being developed to enable the aircraft to simultaneously detect, identify and track various targets on land and in the air and is vital to maintain Typhoon's control of the air. It also provides a new Electronic Warfare capability and sustains Typhoon capability to operate in contested and congested Electromagnetic environments. The programme is being delivered via multiple interdependent contracts. Radar development is being led nationally by the UK; whereas the wider P4E changes to the aircraft systems are being developed with the other Typhoon Partner Nations as part of the international Eurofighter Programme.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. Following successful completion on schedule of the acceptance test procedure, the European Common Radar System Mk2 prototype and supporting documentation was dispatched for the next stage of development. Delayed completion of the Antenna Power Supply and Controller Critical Design Review has impacted the date for the full Radar System Critical Design Review. However, the delay does not impact critical path development activities towards the Initial Operating Capability which are centred around antenna development and are progressing in parallel.","startDate":"2023-02-20","endDate":"2023-01-20","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 decreased from 2040-01-01 to 2023-01-20. This is primarily due to the following factors. NA","fyBaseline":153.01,"fyForecast":173.32,"fyVariance":13.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors: A pull forward of funding from later years to reflect work already completed by Industry at risk. As a result the funding profile for future years has been adjusted accordingly.","wholeLifeCost":2740.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 increased from 565m. to 2740m. This is primarily due to the following factors. The P4E/ECRS Mk2 Programme Full Business Case was approved in March 2022, securing an Approved Budgetary Level funding envelope from its design and manufacture through to the equipment's Full Operating Capability. There has been no change to the programmes requirements and the funding levels remain extant.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This programme does not report cashable benefits. Its aim is to provision the armed forces with the equipment and / or infrastructure required.","themes":["Cost & funding","Delivery & schedule","Scope & requirements","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. Following successful completion on schedule of the acceptance test procedure, the European Common Radar System Mk2 prototype and supporting documentation was…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 decreased from 2040-01-01 to 2023-01-20. This is primarily due to the following factors. NA","narrativeClaimKind":null},{"id":"MOD_0137_2122-Q1","year":2024,"name":"European Common Radar System Mk 2","department":"MOD","category":"Military Capability","description":"The Phase 4 Enhancement (P4E) to the Typhoon aircraft includes upgrades to mission management systems, GPS resilience and navigational precision. It also provides the vehicle for the integration of the European Common Radar System (ECRS) Mk2 onto the aircraft. The radar is being developed to enable the aircraft to simultaneously detect, identify and track various targets on land and in the air and is vital to maintain Typhoon’s control of the air. It also provides a new Electronic Warfare capability and sustains Typhoon capability to operate in contested and congested Electromagnetic environments. The programme is being delivered via multiple interdependent contracts. Radar development is being led nationally by the UK, whereas the wider P4E changes to the aircraft systems are being developed with the other Typhoon Partner Nations as part of the international Eurofighter Programme.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure and Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. Despite delayed completion of the System Critical Design Review from September 21 to November 23, closure of outstanding action is expected in April 24. This has not impacted on the critical path development activities towards the Initial Operating Capability which are centred around antenna development which is progressing in parallel. With the earlier placement of the Phase 1 contract with industry partners, allocation of sub-contracts with suppliers to secure long-lead and high value materials within the terms of the Instruction to Proceed is ongoing.","startDate":"2021-07-01","endDate":"2032-08-01","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 increased from 2023-01-20 to 2032-08-01. This is primarily due to the following factors. The Q4 22/23 end date of 2023-01-20 was incorrect. It should have read 2032-08-01 and so is unchanged at Q4 23/24. Initial Operating Capability (IOC) and Full Operating Capability dates remain unchanged despite the delay to the System Critical Design Review. The establishment of a joint programme governance structure has allowed MOD and Industry to share information effectively and prioritise resources to maintain the schedule. The agreement of a proposal to complete radar development up to IOC has decreased the risk of schedule slippage in this area. Although progress has been made with the other Typhoon Partner Nations and their industries in fixing the scope and schedule of the development of the wider aircraft changes needed to integrate the radar and introduce other P4E capabilities, risk remains.","fyBaseline":140.09,"fyForecast":221.93,"fyVariance":58.42,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. An intentional bring forward of spend by reprofiling costs from future years.","wholeLifeCost":2904.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 increased from 2740m to 2904m. This is primarily due to the following factors. Reflects release of further budget to the Programme including the allocation of a budget for FY 32/33. The Programme’s Full Business Case was approved in March 2022 securing an Approved Budgetary Level (ABL) funding envelope which covers the equipment’s design and manufacture through to its Full Operating Capability and subsequent likely out of service date. There has been no change to the programmes requirements and the increase in Budgeted WLC is contained within the extant ABL.","benefits":0.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 0m.","themes":["Cost & funding","Delivery & schedule","Scope & requirements","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure and Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. Despite delayed completion of the System Critical Design Review from September 21 to November 23, closure of outstanding action is expected in April 24. This has…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 increased from 2023-01-20 to 2032-08-01. This is primarily due to the following factors. The Q4 22/23 end date of 2023-01-20 was incorrect. It should have read 2032-08-01 and so is unchanged at Q4 23/24. Initial Operating Capability (IOC) and Full Operating Capability dates remain unchanged despite the delay to the System Critical Design Review. The establishment of a joint programme governance structure has allowed MOD and Industry to share information effectively and prioritise resources to maintain the schedule. The agreement of a proposal to complete radar development up to IOC has decreased the risk of schedule slippage in this area. Although progress has been made with the other Typhoon Partner Nations and their industries in fixing the scope and schedule of the development of the wider aircraft changes needed to integrate the radar and introduce other P4E capabilities, risk remains.","narrativeClaimKind":null},{"id":"MOD_0137_2122-Q1","year":2025,"name":"EUROPEAN COMMON RADAR SYSTEM MK 2","department":"MoD","category":"Military Capability","description":"The Phase 4 Enhancement (P4E) to the Typhoon aircraft includes upgrades to mission management systems, GPS resilience and navigational precision. It also provides the vehicle for the integration of the European Common Radar System (ECRS) Mk2 onto the aircraft. The radar is being developed to enable the aircraft to simultaneously detect, identify and track various targets on land and in the air and is vital to maintain Typhoon’s control of the air. It also provides a new Electronic Warfare capability and sustains Typhoon capability to operate in contested and congested Electromagnetic environments. The programme is being delivered via multiple interdependent contracts. Radar development is being led nationally by the UK, whereas the wider P4E changes to the aircraft systems are being developed with the other Typhoon Partner Nations as part of the international Eurofighter Programme.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. FY 24/25 continued to present some key challenges. The important risk reduction activity of the ECRS Mk2 Step 1 (prototype system) flight trails have completed and the in-flight data will support the continued development of the system. Securing the UK Minimum Viable Product in the P4E has continued at pace with a plethora of challenging negotiations with Partner Nations. Some uncertainty has been addressed but significant challenges remain to assure the delivery of the ECRS Mk2 capability by 2030.","startDate":"2021-07-01","endDate":"2032-08-01","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 01/08/2032. This is primarily due to the following factors. No change in project end-date.","fyBaseline":207.85,"fyForecast":208.57,"fyVariance":0.35,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":2902.02,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 2904 to 2902. This is primarily due to the following factors. Minimal change that remains within approval tolerances.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Technical & integration"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. FY 24/25 continued to present some key challenges. The important risk reduction activity of the ECRS Mk2 Step 1 (prototype system) flight trails have completed and the in-flight data will support the…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 01/08/2032. This is primarily due to the following factors. No change in project end-date.","narrativeClaimKind":null},{"id":"MOD_0137_2122-Q1","year":2026,"name":"EUROPEAN COMMON RADAR SYSTEM MK 2","department":"MOD","category":"Military Capability","description":"The Phase 4 Enhancement (P4E) to the Typhoon aircraft includes upgrades to mission management systems, GPS resilience and navigational precision. It also provides the vehicle for the integration of the European Common Radar System (ECRS) Mk2 onto the aircraft. The radar is being developed to enable the aircraft to simultaneously detect, identify and track various targets on land and in the air and is vital to maintain Typhoon’s control of the air. It also provides a new Electronic Warfare capability and sustains Typhoon capability to operate in contested and congested Electromagnetic environments. The programme is being delivered via multiple interdependent contracts. Radar development is being led nationally by the UK, whereas the wider P4E changes to the aircraft systems are being developed with the other Typhoon Partner Nations as part of the international Eurofighter Programme.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors. 1. The overall radar design schedule has stabilised and has successfully moved into the manufacture phase with confidence growing on production radars being available in 2028 as planned. However, securing an acceptable delivery schedule for P4E from Eurofighter through the NATO Eurofighter and Tornado Management Agency (NETMA), which is essential to embodying the radar, remains a significant challenge for the UK and Partner Nations. 2. Whilst P4E content has been agreed, Partner Nations are working continually with NETMA and Eurofighter to establish a progressive release of capability which meets each nation's operational need without being detrimental to delivery of the overall programme, alongside extensive transformation being pursued within the NETMA and Eurofighter enterprises.","startDate":"2019-02-01","endDate":"2034-12-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 01/08/2032.","fyBaseline":263.95,"fyForecast":303.89,"fyVariance":15.13,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors: 1. The overspend is the result of the reprofiling of P4E Long Lead Time activities and ECRS Mk2 production into FY25/26 to ensure the critical path is maintained.","wholeLifeCost":2899.01,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) increased from £2902M to £2930M. This is primarily due to the following factors. 1. Minimal cost growth, principally down to increased Typhoon Defensive Aids Sub-System scope/requirements within P4E. 2. The Programme remains within its Approved Budgetary Level.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Delivery & schedule","Scope & requirements","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors. 1. The overall radar design schedule has stabilised and has successfully moved into the manufacture phase with confidence growing on production radars being available in 2028 as…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":true,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 01/08/2032.","narrativeClaimKind":"date-mismatch"}],"previous":{"id":"MOD_0137_2122-Q1","year":2025,"name":"EUROPEAN COMMON RADAR SYSTEM MK 2","department":"MoD","category":"Military Capability","description":"The Phase 4 Enhancement (P4E) to the Typhoon aircraft includes upgrades to mission management systems, GPS resilience and navigational precision. It also provides the vehicle for the integration of the European Common Radar System (ECRS) Mk2 onto the aircraft. The radar is being developed to enable the aircraft to simultaneously detect, identify and track various targets on land and in the air and is vital to maintain Typhoon’s control of the air. It also provides a new Electronic Warfare capability and sustains Typhoon capability to operate in contested and congested Electromagnetic environments. The programme is being delivered via multiple interdependent contracts. Radar development is being led nationally by the UK, whereas the wider P4E changes to the aircraft systems are being developed with the other Typhoon Partner Nations as part of the international Eurofighter Programme.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. FY 24/25 continued to present some key challenges. The important risk reduction activity of the ECRS Mk2 Step 1 (prototype system) flight trails have completed and the in-flight data will support the continued development of the system. Securing the UK Minimum Viable Product in the P4E has continued at pace with a plethora of challenging negotiations with Partner Nations. Some uncertainty has been addressed but significant challenges remain to assure the delivery of the ECRS Mk2 capability by 2030.","startDate":"2021-07-01","endDate":"2032-08-01","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 01/08/2032. This is primarily due to the following factors. No change in project end-date.","fyBaseline":207.85,"fyForecast":208.57,"fyVariance":0.35,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":2902.02,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 2904 to 2902. This is primarily due to the following factors. Minimal change that remains within approval tolerances.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Technical & integration"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. FY 24/25 continued to present some key challenges. The important risk reduction activity of the ECRS Mk2 Step 1 (prototype system) flight trails have completed and the in-flight data will support the…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 01/08/2032. This is primarily due to the following factors. No change in project end-date.","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":882,"attentionScore":55,"attentionReasons":["Published commentary says the end date is unchanged while the published date moved","Current published delivery confidence is Amber","Published end date moved 882 days later","In-year forecast variance is +15.1%"]},{"id":"MOD_0125_2021-Q4","year":2026,"name":"NEW MEDIUM HELICOPTER","department":"MOD","category":"Military Capability","description":"The New Medium Helicopter programme intends to rationalise up to three rotary wing requirements under one aircraft-type. This approach will maximise commonality allowing improvements in efficiency and operational flexibility. The user requires a multi-role platform to operate in all environments in support of Defence tasks and across a spectrum of threats. An open systems architecture is required to allow for rapid employment of different role-fits and carry-on equipment. This will enable efficient future development to meet the demands of a changing threat environment.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25-Q4, the NISTA/SRO Delivery Confidence Assessment rating at 25/26-Q4 remained at Amber. This is primarily due to the following factors: 1.Although the Full Business Case has been approved by cross-government stakeholders, and the contract now awarded to Leonardo Helicopters UK in March 2026, agreement was achieved months later than planned. 2.Other causes of this assessment are resourcing (including lack of resource loaded schedules) across the core programme and delivery teams, because of the delay to approving the Full Business Case.","startDate":"2021-04-30","endDate":"2037-05-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 30/09/2032.","fyBaseline":6.76,"fyForecast":5.84,"fyVariance":13.57,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. 1. Spend on infrastructure being lower than planned, due to pausing activity with a Technical Services Provider to refresh the user requirements following uncertainty with progressing options while the Full Business Case was still awaiting an approval.","wholeLifeCost":1404.92,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) increased from £1222.09M to £1574.04M. This is primarily due to the following factors. 1. Delay in approving the Full Business Case, and now reflecting a new 10-year provision, starting in Financial Year 26/27 (The Outline Business Case provision ended in 31/32). 2. There is also a longer initial support provision when compared to the Outline Business Case Whole Life Cost estimates.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 24/25-Q4, the NISTA/SRO Delivery Confidence Assessment rating at 25/26-Q4 remained at Amber. This is primarily due to the following factors: 1.Although the Full Business Case has been approved by cross-government stakeholders, and the contract now awarded to Leonardo Helicopters UK in March 2026, agreement was achieved months…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":true,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 30/09/2032.","narrativeClaimKind":"date-mismatch","history":[{"id":"MOD_0125_2021-Q4","year":2021,"name":"New Medium Helicopter","department":"MOD","category":"Military Capability","description":"The UK government published the outcome of its Integrated Review of Security, Defence, Development and Foreign Policy on 16 March 2021. In its accompanying Command Paper published on 22 March 2021, the Government announced that investment in a new medium lift helicopter in the mid-2020s will enable a consolidation of the Army's disparate fleet of medium lift helicopters from four platform types to one. Work is now underway to develop the strategic options for this programme and at pace, but at this stage the full scope, cost and timescales for delivery are not yet available.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber.This is primarily due to the following factors: As this stage a prudent Delivery Confidence Assessment of Amber is warranted as the supporting evidence and detail that demonstrates the most suitable capability for Defence, provides value for money, and can be delivered within expected timescales is being developed. It is only when this is in place can a justifiable delivery confidence assessment be made.","startDate":"2021-04-30","endDate":"2036-03-31","scheduleNarrative":"The project end-date is 31 March 2036. This is primarily due to the following factors: The estimate of programme closure has been made on rough order of magnitude and assumptions from other procurement activities of this type. As the work in this area matures a risk adjusted schedule will be available and will better inform Programme closure timelines","fyBaseline":0.0,"fyForecast":0.0,"fyVariance":null,"varianceNarrative":"Some modest investment has been made to initiate this programme, the business cases that will set out the required level of investment and budgetary requirements are being developed and at pace. This will be disclosed to a public audience if it is appropriate to do so while respecting any commercial or security sensitivities.","wholeLifeCost":0.0,"costNarrative":"The GMPP project did not provide data","benefits":null,"benefitsNarrative":"","themes":["Delivery & schedule","Commercial & supply chain","Technical & integration","Workforce & capability"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber.This is primarily due to the following factors: As this stage a prudent Delivery Confidence Assessment of Amber is warranted as the supporting evidence and detail that demonstrates the most suitable capability for Defence, provides value for money, and can be delivered…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project end-date is 31 March 2036. This is primarily due to the following factors: The estimate of programme closure has been made on rough order of magnitude and assumptions from other procurement activities of this type. As the work in this area matures a risk adjusted schedule will be available and will better inform Programme closure timelines","narrativeClaimKind":null},{"id":"MOD_0125_2021-Q4","year":2022,"name":"New Medium Helicopter","department":"MOD","category":"Military Capability","description":"The New Medium Helicopter programme intends to consolidate elements of Defence's disparate fleet of medium lift helicopters from four platform types to one, through the procurement of a new helicopter-type.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber. This is primarily due to the following factors: The supporting evidence and detail that demonstrates the most suitable capability for Defence, providing value for money, and also can be delivered within expected timescales is being developed. Work is at an advanced stage to confirm these aspects, which once agreed will allow a revised delivery confidence assessment to be made.","startDate":"2021-04-30","endDate":"2028-07-07","scheduleNarrative":"Compared to 2021-Q4 the project end-date decreased from 31 Dec 2036 to 07 Jul 2028 . This is primarily due to the following factors: The programme end-date has aligned with Full Operating Capability. There have been no changes to the New Medium Helicopter key milestones since the last Annual Report on Major Projects.","fyBaseline":8.0,"fyForecast":5.4,"fyVariance":-37.0,"varianceNarrative":"The budget variance exceeds 5%. Some modest investment has been made to initiate this programme. The business cases that will set out the required level of investment and budgetary requirements are being developed at pace.","wholeLifeCost":1172.0,"costNarrative":"The projects Baseline Whole Life Cost is 1172.00 (£m). This is primarily due to the following factors: The programme's Whole Life Cost, under current assumptions, is expected to be circa £2132.749M until the New Medium Helicopter's nominal out-of-service date of 2040. This figure includes £1172M captured as the programme's 10 year provision that includes initial aircraft procurement and initial support equipment, and subsequent through-life support to 2040. This assessment is consistent with the 2021 Annual Report on Major Projects.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Workforce & capability","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber. This is primarily due to the following factors: The supporting evidence and detail that demonstrates the most suitable capability for Defence, providing value for money, and also can be delivered within expected timescales is…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to 2021-Q4 the project end-date decreased from 31 Dec 2036 to 07 Jul 2028 . This is primarily due to the following factors: The programme end-date has aligned with Full Operating Capability. There have been no changes to the New Medium Helicopter key milestones since the last Annual Report on Major Projects.","narrativeClaimKind":null},{"id":"MOD_0125_2021-Q4","year":2023,"name":"New Medium Helicopter","department":"MOD","category":"Military Capability","description":"The New Medium Helicopter programme intends to rationalise five rotary wing requirements through the procurement of one new medium lift helicopter-type. This approach will maximise commonality allowing improvements in efficiency and operational flexibility.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. The delay in securing the Outline Business Case approval. Significant work is ongoing to secure approval which will enable the main part of the New Medium Helicopter competition to proceed through the release of an Invitation-to-Negotiate which is expected later this year.","startDate":"2021-04-30","endDate":"2031-09-30","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 increased from 2028-07-07 to 2031-09-30. This is primarily due to the following factors. Since the initial report, further analysis on the programme schedule has been conducted and the financial profile was amended as part of the Ministry of Defence's Annual Budget Cycle 2022. This has led to a revision in the programme's projected end-date.","fyBaseline":3.9,"fyForecast":3.29,"fyVariance":-16.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors: The minor underspend results from activities moving into FY23/24 as a result of the programme not achieving the stretch target of Outline Business Case approval during FY22/23.","wholeLifeCost":1329.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 increased from 1172m. to 1329m. This is primarily due to the following factors. The programme received an uplift to safeguard the capabilities that the New Medium Helicopter programme plans to deliver.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This programme does not report cashable benefits. Its aim is to provision the armed forces with the equipment and / or infrastructure required.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. The delay in securing the Outline Business Case approval. Significant work is ongoing to secure approval which will enable the main part of the New Medium Helicopter…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 increased from 2028-07-07 to 2031-09-30. This is primarily due to the following factors. Since the initial report, further analysis on the programme schedule has been conducted and the financial profile was amended as part of the Ministry of Defence's Annual Budget Cycle 2022. This has led to a revision in the programme's projected end-date.","narrativeClaimKind":null},{"id":"MOD_0125_2021-Q4","year":2024,"name":"New Medium Helicopter","department":"MOD","category":"Military Capability","description":"The New Medium Helicopter programme intends to rationalise up to five rotary wing requirements under one aircraft-type. This approach will maximise commonality allowing improvements in efficiency and operational flexibility. The user requires a multi-role platform to operate in all environments in support of Defence tasks and across a spectrum of threats. An open systems architecture is required to allow for rapid employment of different role-fits and carry-on equipment. This will enable efficient future development to meet the demands of a changing threat environment.","ipaDca":"Green","sroDca":null,"deliveryConfidence":"Green","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 increased from Amber to Green. This is primarily due to the following factors. Invitation to Negotiate release on 27/02/24, meaning the three candidate suppliers will now compile their bids to be evaluated by the Ministry of Defence to determine the winning bidder.","startDate":"2021-04-30","endDate":"2032-09-30","scheduleNarrative":"Compared to financial year 22/23-Q4, the programme's end-date at 23/24-Q4 remained scheduled to finish on 2032-09-30.","fyBaseline":4.23,"fyForecast":1.85,"fyVariance":-56.265,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. At this stage funds are required for critical project management and capability analysis work. The underspend is the result of the significant delay to securing Outline Business Case approval and Invitation-to-Negotiate release which faded several activities into Financial Year 24/25.","wholeLifeCost":1329.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 remained at 1329m. This is primarily due to the following factors. Programme expenditure has been largely stable, with a small adjustment to account for an infrastructure study costing less than originally anticipated.","benefits":0.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 0m.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 increased from Amber to Green. This is primarily due to the following factors. Invitation to Negotiate release on 27/02/24, meaning the three candidate suppliers will now compile their bids to be evaluated by the Ministry of Defence…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":true,"narrativeExcerpt":"Compared to financial year 22/23-Q4, the programme's end-date at 23/24-Q4 remained scheduled to finish on 2032-09-30.","narrativeClaimKind":"says-unchanged"},{"id":"MOD_0125_2021-Q4","year":2025,"name":"NEW MEDIUM HELICOPTER","department":"MoD","category":"Military Capability","description":"The New Medium Helicopter programme intends to rationalise up to three rotary wing requirements under one aircraft-type. This approach will maximise commonality allowing improvements in efficiency and operational flexibility. The user requires a multi-role platform to operate in all environments in support of Defence tasks and across a spectrum of threats. An open systems architecture is required to allow for rapid employment of different role-fits and carry-on equipment. This will enable efficient future development to meet the demands of a changing threat environment.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 increased from GREEN to AMBER. This is primarily due to the following factors. The Amber rating reflects challenges with workforce shortfalls across the core programme and delivery teams, and uncertainty about the outcome of the competition.","startDate":"2021-04-30","endDate":"2032-09-30","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 30/09/2032. The schedule will be further developed after completion of the New Medium Helicopter competition.","fyBaseline":6.58,"fyForecast":5.3,"fyVariance":19.5,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. Spend on infrastructure being lower than planned, due to Defence financial challenges and internal spend commitment controls.","wholeLifeCost":1222.09,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 1329 to 1222. This is primarily due to the following factors. Allocating some funding to support procurement of Airbus Jupiter HC Mk 2 (H145) helicopters for Brunei and Cyprus.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 increased from GREEN to AMBER. This is primarily due to the following factors. The Amber rating reflects challenges with workforce shortfalls across the core programme and delivery teams, and uncertainty about the outcome of the competition. Compared to financial year…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 30/09/2032. The schedule will be further developed after completion of the New Medium Helicopter competition.","narrativeClaimKind":null},{"id":"MOD_0125_2021-Q4","year":2026,"name":"NEW MEDIUM HELICOPTER","department":"MOD","category":"Military Capability","description":"The New Medium Helicopter programme intends to rationalise up to three rotary wing requirements under one aircraft-type. This approach will maximise commonality allowing improvements in efficiency and operational flexibility. The user requires a multi-role platform to operate in all environments in support of Defence tasks and across a spectrum of threats. An open systems architecture is required to allow for rapid employment of different role-fits and carry-on equipment. This will enable efficient future development to meet the demands of a changing threat environment.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25-Q4, the NISTA/SRO Delivery Confidence Assessment rating at 25/26-Q4 remained at Amber. This is primarily due to the following factors: 1.Although the Full Business Case has been approved by cross-government stakeholders, and the contract now awarded to Leonardo Helicopters UK in March 2026, agreement was achieved months later than planned. 2.Other causes of this assessment are resourcing (including lack of resource loaded schedules) across the core programme and delivery teams, because of the delay to approving the Full Business Case.","startDate":"2021-04-30","endDate":"2037-05-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 30/09/2032.","fyBaseline":6.76,"fyForecast":5.84,"fyVariance":13.57,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. 1. Spend on infrastructure being lower than planned, due to pausing activity with a Technical Services Provider to refresh the user requirements following uncertainty with progressing options while the Full Business Case was still awaiting an approval.","wholeLifeCost":1404.92,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) increased from £1222.09M to £1574.04M. This is primarily due to the following factors. 1. Delay in approving the Full Business Case, and now reflecting a new 10-year provision, starting in Financial Year 26/27 (The Outline Business Case provision ended in 31/32). 2. There is also a longer initial support provision when compared to the Outline Business Case Whole Life Cost estimates.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 24/25-Q4, the NISTA/SRO Delivery Confidence Assessment rating at 25/26-Q4 remained at Amber. This is primarily due to the following factors: 1.Although the Full Business Case has been approved by cross-government stakeholders, and the contract now awarded to Leonardo Helicopters UK in March 2026, agreement was achieved months…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":true,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 30/09/2032.","narrativeClaimKind":"date-mismatch"}],"previous":{"id":"MOD_0125_2021-Q4","year":2025,"name":"NEW MEDIUM HELICOPTER","department":"MoD","category":"Military Capability","description":"The New Medium Helicopter programme intends to rationalise up to three rotary wing requirements under one aircraft-type. This approach will maximise commonality allowing improvements in efficiency and operational flexibility. The user requires a multi-role platform to operate in all environments in support of Defence tasks and across a spectrum of threats. An open systems architecture is required to allow for rapid employment of different role-fits and carry-on equipment. This will enable efficient future development to meet the demands of a changing threat environment.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 increased from GREEN to AMBER. This is primarily due to the following factors. The Amber rating reflects challenges with workforce shortfalls across the core programme and delivery teams, and uncertainty about the outcome of the competition.","startDate":"2021-04-30","endDate":"2032-09-30","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 30/09/2032. The schedule will be further developed after completion of the New Medium Helicopter competition.","fyBaseline":6.58,"fyForecast":5.3,"fyVariance":19.5,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. Spend on infrastructure being lower than planned, due to Defence financial challenges and internal spend commitment controls.","wholeLifeCost":1222.09,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 1329 to 1222. This is primarily due to the following factors. Allocating some funding to support procurement of Airbus Jupiter HC Mk 2 (H145) helicopters for Brunei and Cyprus.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 increased from GREEN to AMBER. This is primarily due to the following factors. The Amber rating reflects challenges with workforce shortfalls across the core programme and delivery teams, and uncertainty about the outcome of the competition. Compared to financial year…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 30/09/2032. The schedule will be further developed after completion of the New Medium Helicopter competition.","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":1704,"attentionScore":55,"attentionReasons":["Published commentary says the end date is unchanged while the published date moved","Current published delivery confidence is Amber","Published end date moved 1,704 days later","In-year forecast variance is +13.6%"]},{"id":"MOD_0115_1718-Q2","year":2026,"name":"MECHANISED INFANTRY PROGRAMME","department":"MOD","category":"Military Capability","description":"The Mechanised Infantry Boxer Programme will deliver modern wheeled Armoured Personnel Carriers and an Armoured Fighting Vehicle modular, common base platform that can perform a range of roles across a modernised Army. The vehicles will be a significant contribution to enabling a highly deployable, networked force to operate differently from conventional industrial age combat forces, offering unique competitive advantage whether fighting, peacekeeping or delivering humanitarian aid.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is due to the following factors. 1. This is predominantly driven by global supply chain issues following the war in Ukraine, and Covid, which are not unique to Defence or Boxer but impacts at a key point of vehicle manufacture. 2. The programme’s Initial Operating Capability is delayed with increased risks requiring strong management action, and has been reapproved but not yet published, pending the Defence Investment Plan. 3. The lead contractors of ARTEC, Rheinmetall, and Krauss Maffei Wegmann Nexter Defence Systems (KNDS) have not yet stabilised or fully resolved their ongoing supply chain delays to vehicle production, which is also impacting other areas including support and training.","startDate":"2017-10-27","endDate":"2033-09-09","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 31/3/2033. This is primarily due to the following factors. 1. This year the Initial Operating Capability schedule forecast was delayed as no longer achievable due to supply chain delays impacting delivery and formally reapproved through Review Note 5. 2. This has been further reviewed as the required Collective Training alongside Ajax in Armoured Infantry Brigades is currently impacted by the Ajax pause and alternate training options in the same timeframe were not viable or meaningful. Boxer Collective Training to achieve Initial Operating Capability is being reset and decoupled from Ajax to de-risk this whilst Wavell Structures are matured and joint training will follow; subject to Ajax outcomes.","fyBaseline":529.7,"fyForecast":242.23,"fyVariance":54.27,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. 1. This variance was largely due to delays to vehicle deliveries, Bowman Government Furnished Equipment, Special Tools and Test Equipment and delays in Requests for Quotation for new items and training aids.","wholeLifeCost":5033.66,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) decreased from £7009.30M to £5150.92M. This is primarily due to the following factors. 1. The Programme Whole Life Cost Budget (not cost) to Full Operating Capability has decreased since Q4 24/25 as a consequence of funding removal following Army re-prioritisation of further procurements and Defence Investment Plan Outcomes. 2. There is an ongoing conversation with industry on treatment of contractual VoP (Variation of Price), caused by inflationary supply chain pressures which are also awaiting the Defence Investmetn Plan.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Workforce & capability","Commercial & supply chain","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is due to the following factors. 1. This is predominantly driven by global supply chain issues following the war in Ukraine, and Covid, which are not unique to Defence or Boxer but impacts at a key point of vehicle manufacture.…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":true,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 31/3/2033. This is primarily due to the following factors. 1. This year the Initial Operating Capability schedule forecast was delayed as no longer achievable due to supply chain delays impacting delivery and formally reapproved through Review Note 5. 2. This has been further reviewed as the required Collective Training alongside Ajax in Armoured Infantry Brigades is currently impacted by the Ajax pause and alternate training options in the same timeframe were not viable or meaningful. Boxer Collective Training to achieve Initial Operating Capability is being reset and decoupled from Ajax to de-risk this whilst Wavell Structures are matured and joint training will follow; subject to Ajax outcomes.","narrativeClaimKind":"date-mismatch","history":[{"id":"MOD_0115_1718-Q2","year":2020,"name":"Mechanised Infantry Programme","department":"MOD","category":"Military Capability","description":"Delivers agile Mechanised Infantry able to operate at reach, at speed, in complex terrain and with low logistic need.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber, which has not changed since last year�s Q2 1819 Amber, due primarily to the following factors; - The schedule remained stable and unchanged between Q2 18/19 and Q2 19/20 - MIV remained on course for a Main Gate Business Case submission and approval in line with the schedule between Q2 18/19 and Q2 19/20 Since the Q2 1920 (30th September 2019) Amber IPA DCA, the following non-project operating environment activities have impacted the original Q2 IPA DCA; - There have been no relevant external factors which have impacted the original DCA. Since the Q2 1920 (30th September 2019) Amber IPA DCA, the following primary project actions have impacted the original Q2 IPA DCA; - The Mech Inf Main Gate Business Case was approved in Q4 Calendar Year 2019 which improved the DCA from AMBER to AMBER/GREEN - The prime contact was signed with ARTEC (Original Equipment Manufacturer) via OCCAR (Organisation Conjointe de Coop�ration en mati�re d'Armement - the international organisation through which procurement is taking place) at the end of Q4 calendar year 2019.","startDate":"2018-04-02","endDate":"2032-12-31","scheduleNarrative":"The scheduled project end date at Q2 1920 (30th September 2019) is 31/12/32, due primarily to the following factors; - Full Operating Capability will be achieved by 2032, including the delivery of all platforms on contract. Since the Q2 1920 (30th September 2019) baseline project end date of 31/12/32, the following non-project operating environment activities have impacted the original Q2 baseline project end date; - There have been no relevant external factors which have impacted the project end date - it remains as provided in the Main Gate Business Case. Since the Q2 1920 (30th September 2019) baseline project end date of 31/12/32, the following primary project actions have impacted the original Q2 baseline project end date; - The baseline project end date remains extant. - Design work is continuing as planned. Covid 19 has yet to have a clear impact, but we are monitoring the situation closely.","fyBaseline":7.84,"fyForecast":8.16,"fyVariance":4.0,"varianceNarrative":"Budget variance less than 5%","wholeLifeCost":4663.31,"costNarrative":"The baseline Whole Life Cost at Q2 1920 (30th September 2019) is �4,663.31 m, due primarily to the following factors; - This reflects the forecast cost as at Sep 2019 following industry responses to Request For Quotations (RFQ) and continued negotiations. - The forecast cost is in line with the scope approved in the Initial Gate Business Case (IGBC) Since the Q2 1920 (30th September 2019) �4,663.31 m baseline Whole Life Cost, the following non-project operating environment activities have impacted the original baseline Q2 Whole Life Cost; - No operating environment factors have impacted on WLCs. Covid 19 has not yet impacted programme costs and activity continues on time and to budget. Since the Q2 1920 (30th September 2019) �4,663.31 m baseline Whole Life Cost, the following primary project actions have impacted the original Q2 baseline Whole Life Cost; - The ruling that VAT costs could be returned to the project, received in Q1 CY 2020, has reduced funding by c�456m. - No significant project actions have impacted on WLCs.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Commercial & supply chain"],"evidenceExcerpt":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber, which has not changed since last year�s Q2 1819 Amber, due primarily to the following factors; - The schedule remained stable and unchanged between Q2 18/19 and Q2 19/20 - MIV remained on course for a Main Gate Business Case submission and approval in line with…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2020","sourceLabel":"IPA Annual Report 2019-20","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The scheduled project end date at Q2 1920 (30th September 2019) is 31/12/32, due primarily to the following factors; - Full Operating Capability will be achieved by 2032, including the delivery of all platforms on contract. Since the Q2 1920 (30th September 2019) baseline project end date of 31/12/32, the following non-project operating environment activities have impacted the original Q2 baseline project end date; - There have been no relevant external factors which have impacted the project end date - it remains as provided in the Main Gate Business Case. Since the Q2 1920 (30th September 2019) baseline project end date of 31/12/32, the following primary project actions have impacted the original Q2 baseline project end date; - The baseline project end date remains extant. - Design work is continuing as planned. Covid 19 has yet to have a clear impact, but we are monitoring the situation closely.","narrativeClaimKind":null},{"id":"MOD_0115_1718-Q2","year":2021,"name":"Mechanised Infantry Programme","department":"MOD","category":"Military Capability","description":"The Mechanised Infantry Programme will deliver modern wheeled Armoured Personnel Carriers that can perform a range of roles to support the Infantry, Combat Support, and Combat Service Support elements across new Brigade Combat Teams - a new concept emerging from the Integrated Review. The vehicles will be a significant contributuion to enabling a highly deployable, networked force to operate differently from conventional industrial age combat forces, offering unique competitive advantage whether fighting, peacekeeping or delivering humanitarian aid.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating decreased from Amber to Amber/Green. This is primarily due to the following factors: The September 2019 Infrastructure and Projects Authority report recommended the Delivery Confidence Assessment should be Amber Green if the Main Gate Business Case approval was achieved by the end of that year, which it was. Subsequently, the Programme is progressing well. Further opportunity to accelerate, uplift and enhance the programme to implement Integrated Review decisions are being explored, and will be added to the programme baseline when finalised and approved. An export bid is also being explored jointly with industry and wider government.","startDate":"2017-10-27","endDate":"2032-12-31","scheduleNarrative":"Compared to financial year 19/20-Q2, the project's end-date remained scheduled to finish on 31 December 2032 . This is primarily due to the following factors:","fyBaseline":68.44,"fyForecast":123.52,"fyVariance":80.0,"varianceNarrative":"The budget variance exceeds 5%. The quoted figures relate to the approved approved Whole Life Costs to 32/33. The main changes are the re profiling adjustments made within the financial year as follows: Reprofiling declared at Programme Cost Review 2, 2020 and remainder at Accounting Period 0, 2020/21. ARTEC BOXER Production Contract - Reprofile of funding to Financial Year 2020/21 previously profiled in future years. This is due to more accurate task level information supplied by the contractor following contract award Re-profile of ARTEC forecast following provision of further refined Earned Value Management data from industry showing accruals profile updated for realism and accuracy. Key activities now profiled in year include Critical Design Review, Manufacturing Management and Technical Decision support","wholeLifeCost":3963.56,"costNarrative":"Compared to financial year 19/20-Q2, the projects Baseline Whole Life Cost decreased from 4663.30m to �3963.56m. This is primarily due to the following factors: The Whole Life Budget c.�4Bn is for the Main Gate Approved period to 32/33. It includes Approved, Unapproved values and sunk costs. The VAT element was removed from the profile and the Annual Budgeting Limits adjusted to reflect this adjustment. To note, the whole life costs for the programme have not increased as a result of this change.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Approvals & decisions","Governance & assurance","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating decreased from Amber to Amber/Green. This is primarily due to the following factors: The September 2019 Infrastructure and Projects Authority report recommended the Delivery Confidence Assessment should be Amber Green if the Main Gate Business…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 19/20-Q2, the project's end-date remained scheduled to finish on 31 December 2032 . This is primarily due to the following factors:","narrativeClaimKind":null},{"id":"MOD_0115_1718-Q2","year":2022,"name":"Mechanised Infantry Programme","department":"MOD","category":"Military Capability","description":"The Mechanised Infantry Programme will deliver modern wheeled Armoured Personnel Carriers that can perform a range of roles to support the Infantry, Combat Support, and Combat Service Support elements across new Brigade Combat Teams - a new concept emerging from the Integrated Review. The vehicles will be a significant contribution to enabling a highly deployable, networked force to operate differently from conventional industrial age combat forces, offering unique competitive advantage whether fighting, peacekeeping or delivering humanitarian aid.","ipaDca":"Green","sroDca":null,"deliveryConfidence":"Green","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating increased from Amber/Green to Green. This is primarily due to the following factors: The removal of the incremental Amber/Green and Amber/Red assessment ratings. Overall there is strong strategic alignment and high level support, good progress and confidence in achieving the Approved Programme baseline at P50. Defence Equipment & Support and industry are experiencing some delivery delay against the contracted (deterministic) baseline, however this remains within the approved risk adjusted 50% schedule. There are some challenging issues in the global supply chain from both COVID and more recently global events, which are not unique to Boxer and could impact commercial and defence industry generally.","startDate":"2017-10-27","endDate":"2033-03-31","scheduleNarrative":"Compared to 2021-Q4, the project end-date increased from 31 December 32 to 31 March 33. This is primarily due to the following factors: Earlier forecasts were that delivery would be achieved well ahead of approved baseline schedule, however current delays are eating into this but it remains within the 50% approval, pending some recovery action plans with industry. Defence Equipment & Support and industry are experiencing some delivery delay against the contracted (deterministic) baseline, however this remains within the approved risk adjusted 50% schedule. There are some challenging issues in the global supply chain from both COVID and more recently global events, which are not unique to Boxer and could impact commercial and defence industry generally. There is strong collaboration across MOD, Industry and Allies working collaboratively to understand and mitigate these potential issues.","fyBaseline":137.66,"fyForecast":105.44,"fyVariance":-23.0,"varianceNarrative":"The budget variance exceeds 5%. Most of the variance is due to favourable Euro foreign exchange rates, retirement of design and development risk and uncertainty given demonstration phase progress, lower expenditure on Government Furnished Equipment (being delayed to future years with interim solutions for Interim Operating Capability) and increased in year vehicle manufacture activity compared to initial forecast.","wholeLifeCost":6575.0,"costNarrative":"Compared to financial year 20/21-Q4, the projects Baseline Whole Life Cost increased from £3963.56m to £6575.172m. This is primarily due to the following factors: The Defence in a Competitive Age Command Paper (CP411) published in March 2021 confirmed that the Army will be able to invest new funds into accelerating the in-service date of the Boxer armoured vehicle and enhancing its capability. Boxer will allow the Army to respond at pace to deliver soldiers around the battlefield, travelling long distances quickly, cross country, and in the most austere and hostile environments. This broader scope including an additional 100 vehicles are now on contract.","benefits":null,"benefitsNarrative":"","themes":["Delivery & schedule","Cost & funding","Commercial & supply chain","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating increased from Amber/Green to Green. This is primarily due to the following factors: The removal of the incremental Amber/Green and Amber/Red assessment ratings. Overall there is strong strategic alignment and high level support, good progress…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to 2021-Q4, the project end-date increased from 31 December 32 to 31 March 33. This is primarily due to the following factors: Earlier forecasts were that delivery would be achieved well ahead of approved baseline schedule, however current delays are eating into this but it remains within the 50% approval, pending some recovery action plans with industry. Defence Equipment & Support and industry are experiencing some delivery delay against the contracted (deterministic) baseline, however this remains within the approved risk adjusted 50% schedule. There are some challenging issues in the global supply chain from both COVID and more recently global events, which are not unique to Boxer and could impact commercial and defence industry generally. There is strong collaboration across MOD, Industry and Allies working collaboratively to understand and mitigate these potential issues.","narrativeClaimKind":null},{"id":"MOD_0115_1718-Q2","year":2023,"name":"Mechanised Infantry Programme","department":"MOD","category":"Military Capability","description":"The Mechanised Infantry Programme will deliver modern wheeled Armoured Personnel Carriers that can perform a range of roles to support the Infantry, Combat Support, and Combat Service Support elements across new Brigade Combat Teams - a new concept emerging from the Integrated Review. The vehicles will be a significant contribution to enabling a highly deployable, networked force to operate differently from conventional industrial age combat forces, offering unique competitive advantage whether fighting, peacekeeping or delivering humanitarian aid.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 decreased from Green to Amber. This is primarily due to the following factors. Global supply chain issues following Covid and the current war in Ukraine impacting at a key point of vehicle manufacture. The programme still forecasts to meet its approved Initial Operating Capability in October 2025 but increased risks require strong management action. The lead contractors have not yet stabilised or fully resolved their ongoing supply chain delays to vehicle production, which is also impacting other areas including training. Further remedial work is also required on Technical Documentation currently being drafted to enable acceptance and safety case work. Similar supply chain issues are also impacting the supply of communications equipment for Boxer also compounded by obsolescence and global supply chain impacts.","startDate":"2017-10-27","endDate":"2033-03-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2033-03-31. This is primarily due to the following factors. NA","fyBaseline":281.43,"fyForecast":86.37,"fyVariance":-69.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors: Delays to equipment delivery and Bowman Government Furnished Equipment with the remainder a combination of reprofiling for risk, training aids, special tools and test equipment, and technical publications.","wholeLifeCost":6741.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 increased from 6575m. to 6741m. This is primarily due to the following factors. Re-profiling from in-year into future years. This was a direct consequence of equipment and Bowman delays and prudent risk-adjustment.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This programme does not report cashable benefits. Its aim is to provision the armed forces with the equipment and / or infrastructure required.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 decreased from Green to Amber. This is primarily due to the following factors. Global supply chain issues following Covid and the current war in Ukraine impacting at a key point of vehicle manufacture. The programme still forecasts…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2033-03-31. This is primarily due to the following factors. NA","narrativeClaimKind":null},{"id":"MOD_0115_1718-Q2","year":2024,"name":"Mechanised Infantry Programme","department":"MOD","category":"Military Capability","description":"The Mechanised Infantry Programme will deliver modern wheeled Armoured Personnel Carriers that can perform a range of roles to support the Infantry, Combat Support, and Combat Service Support elements across new Brigade Combat Teams - a new concept emerging from the Integrated Review. The vehicles will be a significant contribution to enabling a highly deployable, networked force to operate differently from conventional industrial age combat forces, offering unique competitive advantage whether fighting, peacekeeping or delivering humanitarian aid.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The programme still forecasts to meet its approved Initial Operating Capability in October 2025 but there are increased risks requiring strong management action. The lead contractors of ARTEC (a supplier), Rheinmetall, and Krauss Maffei Wegmann Nexter Defence Systems (KNDS) have not yet stabilised or fully resolved their ongoing supply chain delays to vehicle production, which is also impacting other areas including training. Further remedial work is also required on Technical Documentation currently being drafted to enable acceptance and safety case work. Similar supply chain issues are also impacting the supply of Bowman communications equipment for Boxer also compounded by obsolescence and global supply chain impacts following the war in Ukraine.","startDate":"2017-10-27","endDate":"2033-03-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2033-03-31. This is primarily due to the following factors. The programme has maintained its overall schedule forecast since Q4 2023 against the approved Initial Operating Capability of October 2025, which allowed for risk and contingency in its delivery activities. Industry delays to equipment delivery have consumed contingent float and impacted other programmes aspects, but revised delivery plans are mitigating impacts, including some joint rather than sequential trials between industry and MOD. Early training of driver and operator/maintainer instructors have been undertaken collaborative with Dutch and German allies to de-risk training design, whilst industry are switching supply chains and identifying interim or alternate components to progress trials and manufacture.","fyBaseline":337.18,"fyForecast":144.39,"fyVariance":-57.177,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. This variance was largely due to delays to equipment delivery and Bowman Government Furnished Equipment with the remainder a combination of reprofiling for training aids, specialist tools and test equipment, and technical publications.","wholeLifeCost":6967.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 increased from 6741m. to 6967m. This is primarily due to the following factors. The Programme Whole Life Cost (WLC) Budget (not cost) to Full Operating Capability has increased by 227m since Q4 22/23 as a consequence of re-profiling from prior years into future years. As prior year control totals are not reset as a result of forecast reprofiling, this gives an artificial picture of an increase in cost. This was a direct consequence of equipment and Bowman delays and prudent risk-adjustment.","benefits":0.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 0m.","themes":["Cost & funding","Delivery & schedule","Workforce & capability","Commercial & supply chain"],"evidenceExcerpt":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The programme still forecasts to meet its approved Initial Operating Capability in October 2025 but there are increased risks requiring strong management action. The lead contractors of ARTEC (a supplier),…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2033-03-31. This is primarily due to the following factors. The programme has maintained its overall schedule forecast since Q4 2023 against the approved Initial Operating Capability of October 2025, which allowed for risk and contingency in its delivery activities. Industry delays to equipment delivery have consumed contingent float and impacted other programmes aspects, but revised delivery plans are mitigating impacts, including some joint rather than sequential trials between industry and MOD. Early training of driver and operator/maintainer instructors have been undertaken collaborative with Dutch and German allies to de-risk training design, whilst industry are switching supply chains and identifying interim or alternate components to progress trials and manufacture.","narrativeClaimKind":null},{"id":"MOD_0115_1718-Q2","year":2025,"name":"MECHANISED INFANTRY PROGRAMME","department":"MoD","category":"Military Capability","description":"The Mechanised Infantry Boxer Programme will deliver modern wheeled Armoured Personnel Carriers and an Armoured Fighting Vehicle modular, common base platform that can perform a range of roles to support the Infantry, Combat Support, and Combat Service Support elements across new Brigade Combat Teams - a new concept emerging from the Integrated Review. The vehicles will be a significant contribution to enabling a highly deployable, networked force to operate differently from conventional industrial age combat forces, offering unique competitive advantage whether fighting, peacekeeping or delivering humanitarian aid.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER, compared with the project's assessment last year of AMBER. This is due to the following factors. The Amber Deliver Confidence Assessment reflects the whole programme delivery forecast to full operating capability (FOC). The Amber rating is still predominantly driven by global supply chain issues following the war in Ukraine and Covid, which are not unique to Defence or Boxer but impacts at a key point of vehicle manufacture. There are increased risks requiring strong management action to drive towards IOC which are not expected to continue through to FOC. Delivery performance is impacted by the lead contractors ARTEC, comprising Rheinmetall and KNDS, who have not yet stabilised or fully resolved their ongoing supply chain delays to vehicle production - which is also impacting other areas including training. Further remedial work is also required on technical documentation currently being drafted to enable training and safety case work. Similar supply chain issues are also impacting the supply of Bowman communications equipment for Boxer also compounded by obsolescence and global supply chain impacts following the war in Ukraine. The DCA is confirmed as Amber by a recent external NISTA Gate 4 programme review.","startDate":"2017-10-27","endDate":"2033-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2033.","fyBaseline":406.66,"fyForecast":297.93,"fyVariance":26.74,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The programme is forecasted to spend £296.446M of £404.82M provisioned to Core Boxer for 24/25 which has resulted in a fade of £108.374M. Vehicle delivery dates were re-profiled to £52M in September 24 following updated delivery dates. Savings have been made in year to reflect the current Capital Departmental Expenditure Limit (CDEL) deferral measures which were implemented at the June 24 forecast. Capital spares were re-profiled in March to 25/26, again based on the updated contractor delivery forecast.","wholeLifeCost":7009.3,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 6967 to 7009. This is primarily due to the following factors. The Programme Whole Life Cost (WLC Budget) (not cost) to Full Operating Capability (FOC) (which includes provision for addition vehicle procurement) has increased by £41.44m since Q4 23/24 as a consequence of re-profiling from prior years into future years and application of the latest inflation estimates offset by re-statement of Foreign Exchange assumptions. This was a direct consequence of vehicle and Bowman delays. As prior year control totals are not reset as a result of forecast reprofiling, this gives an artificial picture of an increase in cost.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Workforce & capability"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER, compared with the project's assessment last year of AMBER. This is due to the following factors. The Amber Deliver Confidence Assessment reflects the whole programme delivery forecast to full operating capability (FOC). The Amber rating is still predominantly…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2033.","narrativeClaimKind":null},{"id":"MOD_0115_1718-Q2","year":2026,"name":"MECHANISED INFANTRY PROGRAMME","department":"MOD","category":"Military Capability","description":"The Mechanised Infantry Boxer Programme will deliver modern wheeled Armoured Personnel Carriers and an Armoured Fighting Vehicle modular, common base platform that can perform a range of roles across a modernised Army. The vehicles will be a significant contribution to enabling a highly deployable, networked force to operate differently from conventional industrial age combat forces, offering unique competitive advantage whether fighting, peacekeeping or delivering humanitarian aid.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is due to the following factors. 1. This is predominantly driven by global supply chain issues following the war in Ukraine, and Covid, which are not unique to Defence or Boxer but impacts at a key point of vehicle manufacture. 2. The programme’s Initial Operating Capability is delayed with increased risks requiring strong management action, and has been reapproved but not yet published, pending the Defence Investment Plan. 3. The lead contractors of ARTEC, Rheinmetall, and Krauss Maffei Wegmann Nexter Defence Systems (KNDS) have not yet stabilised or fully resolved their ongoing supply chain delays to vehicle production, which is also impacting other areas including support and training.","startDate":"2017-10-27","endDate":"2033-09-09","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 31/3/2033. This is primarily due to the following factors. 1. This year the Initial Operating Capability schedule forecast was delayed as no longer achievable due to supply chain delays impacting delivery and formally reapproved through Review Note 5. 2. This has been further reviewed as the required Collective Training alongside Ajax in Armoured Infantry Brigades is currently impacted by the Ajax pause and alternate training options in the same timeframe were not viable or meaningful. Boxer Collective Training to achieve Initial Operating Capability is being reset and decoupled from Ajax to de-risk this whilst Wavell Structures are matured and joint training will follow; subject to Ajax outcomes.","fyBaseline":529.7,"fyForecast":242.23,"fyVariance":54.27,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. 1. This variance was largely due to delays to vehicle deliveries, Bowman Government Furnished Equipment, Special Tools and Test Equipment and delays in Requests for Quotation for new items and training aids.","wholeLifeCost":5033.66,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) decreased from £7009.30M to £5150.92M. This is primarily due to the following factors. 1. The Programme Whole Life Cost Budget (not cost) to Full Operating Capability has decreased since Q4 24/25 as a consequence of funding removal following Army re-prioritisation of further procurements and Defence Investment Plan Outcomes. 2. There is an ongoing conversation with industry on treatment of contractual VoP (Variation of Price), caused by inflationary supply chain pressures which are also awaiting the Defence Investmetn Plan.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Workforce & capability","Commercial & supply chain","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is due to the following factors. 1. This is predominantly driven by global supply chain issues following the war in Ukraine, and Covid, which are not unique to Defence or Boxer but impacts at a key point of vehicle manufacture.…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":true,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 31/3/2033. This is primarily due to the following factors. 1. This year the Initial Operating Capability schedule forecast was delayed as no longer achievable due to supply chain delays impacting delivery and formally reapproved through Review Note 5. 2. This has been further reviewed as the required Collective Training alongside Ajax in Armoured Infantry Brigades is currently impacted by the Ajax pause and alternate training options in the same timeframe were not viable or meaningful. Boxer Collective Training to achieve Initial Operating Capability is being reset and decoupled from Ajax to de-risk this whilst Wavell Structures are matured and joint training will follow; subject to Ajax outcomes.","narrativeClaimKind":"date-mismatch"}],"previous":{"id":"MOD_0115_1718-Q2","year":2025,"name":"MECHANISED INFANTRY PROGRAMME","department":"MoD","category":"Military Capability","description":"The Mechanised Infantry Boxer Programme will deliver modern wheeled Armoured Personnel Carriers and an Armoured Fighting Vehicle modular, common base platform that can perform a range of roles to support the Infantry, Combat Support, and Combat Service Support elements across new Brigade Combat Teams - a new concept emerging from the Integrated Review. The vehicles will be a significant contribution to enabling a highly deployable, networked force to operate differently from conventional industrial age combat forces, offering unique competitive advantage whether fighting, peacekeeping or delivering humanitarian aid.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER, compared with the project's assessment last year of AMBER. This is due to the following factors. The Amber Deliver Confidence Assessment reflects the whole programme delivery forecast to full operating capability (FOC). The Amber rating is still predominantly driven by global supply chain issues following the war in Ukraine and Covid, which are not unique to Defence or Boxer but impacts at a key point of vehicle manufacture. There are increased risks requiring strong management action to drive towards IOC which are not expected to continue through to FOC. Delivery performance is impacted by the lead contractors ARTEC, comprising Rheinmetall and KNDS, who have not yet stabilised or fully resolved their ongoing supply chain delays to vehicle production - which is also impacting other areas including training. Further remedial work is also required on technical documentation currently being drafted to enable training and safety case work. Similar supply chain issues are also impacting the supply of Bowman communications equipment for Boxer also compounded by obsolescence and global supply chain impacts following the war in Ukraine. The DCA is confirmed as Amber by a recent external NISTA Gate 4 programme review.","startDate":"2017-10-27","endDate":"2033-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2033.","fyBaseline":406.66,"fyForecast":297.93,"fyVariance":26.74,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The programme is forecasted to spend £296.446M of £404.82M provisioned to Core Boxer for 24/25 which has resulted in a fade of £108.374M. Vehicle delivery dates were re-profiled to £52M in September 24 following updated delivery dates. Savings have been made in year to reflect the current Capital Departmental Expenditure Limit (CDEL) deferral measures which were implemented at the June 24 forecast. Capital spares were re-profiled in March to 25/26, again based on the updated contractor delivery forecast.","wholeLifeCost":7009.3,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 6967 to 7009. This is primarily due to the following factors. The Programme Whole Life Cost (WLC Budget) (not cost) to Full Operating Capability (FOC) (which includes provision for addition vehicle procurement) has increased by £41.44m since Q4 23/24 as a consequence of re-profiling from prior years into future years and application of the latest inflation estimates offset by re-statement of Foreign Exchange assumptions. This was a direct consequence of vehicle and Bowman delays. As prior year control totals are not reset as a result of forecast reprofiling, this gives an artificial picture of an increase in cost.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Workforce & capability"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER, compared with the project's assessment last year of AMBER. This is due to the following factors. The Amber Deliver Confidence Assessment reflects the whole programme delivery forecast to full operating capability (FOC). The Amber rating is still predominantly…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2033.","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":162,"attentionScore":54,"attentionReasons":["Published commentary says the end date is unchanged while the published date moved","Current published delivery confidence is Amber","Published end date moved 162 days later","In-year forecast variance is +54.3%"]},{"id":"DFT_0141_2223-Q1","year":2026,"name":"NORTHERN POWERHOUSE RAIL","department":"DFT","category":"Infrastructure and Construction","description":"Northern Powerhouse Rail (NPR) is the Government's long-term programme to further improve connectivity in the North of England as a fundamental part of the government's Northern Growth Strategy. Northern Powerhouse Rail aims to create a frequent and reliable turn-up-and-go railway service across the Northern Growth Corridor (including Liverpool, Manchester, Bradford, Leeds, Sheffield and York) with regular services continuing to Newcastle, Hull and Chester.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to the financial year 24/25 Q4, the NISTA Delivery Confidence Assessment rating at 25/26 Q4 has improved from Red to Amber. This improvement is primary a result of NPR receiving an agreed funding commitment in January 2026 of up to £45bn in 2025 prices, along with decisions on the single biggest scope choice in terms of the approach between Manchester and Liverpool and use of the Crewe-Manchester hybrid Bill.","startDate":"2016-02-01","endDate":"2051-12-31","scheduleNarrative":"Compared to the financial year 24/25 Q4 the NPR project end date has increased from December 2045 to December 2051. This reflects updates to the scope of the programme which had not been updated since the previous government's Network North Command Paper, and takes into account the planning which is forming the Programme Business Case.","fyBaseline":200.84,"fyForecast":60.67,"fyVariance":69.79,"varianceNarrative":"The budget variance for NPR for FY 25/26 has exceeded 5% which is a result of the following factors: The uncertainty around scope of the programme and direction of the hybrid Bill until January 2026 caused a number of previously planned activities to be either deferred into future financial years or removed from the scope of the programme; resulting in a reduction of spend from the previous programme baseline. The NPR Programme will formally rebaseline its cost profile following the completion of the Programme Business Case.","wholeLifeCost":45000.0,"costNarrative":"Compared to Financial Year 24/25-Q4 the programme's agreed whole life costs at Q4 25-26 (measured in £bn) has increased from 30.60 in 2019 prices to 45.00 in 2025 prices. This update reflects the agreed government upper limit funding profile which was announced as part of the Northern Powerhouse Rail announcement within the wider Northern Growth Strategy in January 2026. A refined cost profile for the programme will be developed following the completion of the Programme Business Case.","benefits":11629.06,"benefitsNarrative":"Compared to financial year 24/25-Q4, the programme's departmentally agreed Benefits at 25/26-Q4 (measured in £m in 2010/11 prices) remained at 8007. NPR benefits continue to remain unchanged pending an update as part of the Programme Business Case due later in the year. An updated benefits profile will be produced following the publication of the Programme Business Case","themes":["Cost & funding","Scope & requirements","Approvals & decisions","Delivery & schedule"],"evidenceExcerpt":"Compared to the financial year 24/25 Q4, the NISTA Delivery Confidence Assessment rating at 25/26 Q4 has improved from Red to Amber. This improvement is primary a result of NPR receiving an agreed funding commitment in January 2026 of up to £45bn in 2025 prices, along with decisions on the single biggest scope choice in terms of the approach between…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to the financial year 24/25 Q4 the NPR project end date has increased from December 2045 to December 2051. This reflects updates to the scope of the programme which had not been updated since the previous government's Network North Command Paper, and takes into account the planning which is forming the Programme Business Case.","narrativeClaimKind":null,"history":[{"id":"DFT_0141_2223-Q1","year":2023,"name":"Northern Powerhouse Rail (NPR)","department":"DFT","category":"Infrastructure and Construction","description":"Northern Powerhouse Rail (NPR) is the Government's vision to transform rail connectivity by providing faster and more frequent services between the Norths key economic centres. NPR is aligned to the government's Integrated Rail Plan and, subject to ministerial agreement, will see route developments and upgrades between Liverpool to Manchester, Leeds, York, and Newcastle.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 is Amber. This is primarily due to the following factors. The Strategic Outline Business Case (SOBC) continues to be revised to align to the Integrated Rail Plan (IRP) including updating the economic analysis underpinning the NPR Business Case. Due to the assurance of the economic analysis outputs taking longer than anticipated, the scheduled date for ministerial approval (Q4 FY 2022/23) has been impacted.A revised plan has been developed, which, subject to necessary approvals being received at each stage, will see the SOBC submitted to government for approval in Q2 FY 2023/24. Despite the delay to the original plan, ultimate delivery of the scheme as planned remains feasible, with additional uncertainty over actual target dates until the post-Autumn Statement re-baselining of the whole IRP portfolio is complete.","startDate":"2016-06-01","endDate":"2045-01-01","scheduleNarrative":"The project's end-date at 22/23-Q4 is 2045-01-01. This is primarily due to the following factors. End date aligns with recently published Integrated Rail Plan (IRP) report. Northern Powerhouse Rail Strategic Outline Business Case (SOBC) is being updated to align with the Integrated Rail Plan (IRP).","fyBaseline":39.1,"fyForecast":30.5,"fyVariance":-22.0,"varianceNarrative":"The budget variance exceeds 5%. Majority of underspend sits with Network Rail due to funding and remit being confirmed in Q1 of Financial Year 2022/23 which impacted Network Rail ability to mobilise and commence activity at the start of the Financial Year (22/23).","wholeLifeCost":17265.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 22/23-Q4 is 17265m. This is primarily due to the following factors. The figure provided is the capital cost (2019 prices) of building the NPR Core network in line with the Strategic Outline Business Case being prepared. This figure will be reviewed in Q1 2023/24 as it currently does not include operating costs, renewal costs, or the impact of the real cost of inflation.","benefits":19453.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 19453m. The figure shown is based on early planning and is being updated as part of finalisation of the Strategic Outline Business Case. A revised figure will be provided in Q1 2023/24.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Commercial & supply chain"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 is Amber. This is primarily due to the following factors. The Strategic Outline Business Case (SOBC) continues to be revised to align to the Integrated Rail Plan (IRP) including updating the economic analysis underpinning the NPR Business Case. Due to the assurance of…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 22/23-Q4 is 2045-01-01. This is primarily due to the following factors. End date aligns with recently published Integrated Rail Plan (IRP) report. Northern Powerhouse Rail Strategic Outline Business Case (SOBC) is being updated to align with the Integrated Rail Plan (IRP).","narrativeClaimKind":null},{"id":"DFT_0141_2223-Q1","year":2024,"name":"Northern Powerhouse Rail (NPR)","department":"DFT","category":"Infrastructure and Construction","description":"Northern Powerhouse Rail (NPR) is the government's vision to transform east - west rail connectivity in the North of England by providing faster and more frequent services between its key economic centres. The scope of NPR is set out in Network North and the Integrated Rail Plan. It will deliver improvements to rail capacity and journey times via fully electrified, upgraded, and new railway lines between Liverpool, Manchester, Bradford, Leeds, Sheffield, Rotherham, York, Hull, and Newcastle.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. Following the Network North announcement in October 2023, the programme will need to fully revise the Strategic Outline Business Case (SOBC) to reflect the expanded scope of Northern Powerhouse Rail (NPR). Delivery of the SOBC is dependent on a new funding profile for NPR being agreed across government and will encompass a re-assessment of NPR's value for money proposition. In March 2024, ministers set out the proposed next steps for the NPR route between Liverpool and Manchester, with the primary option to include new stations at Warrington and Manchester Airport, and the ambition to adapt the HS2 Phase 2b hybrid Bill for NPR.","startDate":"2016-06-01","endDate":"2045-12-29","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 increased from 2045-01-01 to 2045-12-29. This is primarily due to the following factors. End date aligns with Integrated Rail Plan (IRP) target year of 2045. The project end date will be reassessed as part of the revision of the SOBC to reflect the additional Network North scope.","fyBaseline":35.89,"fyForecast":33.52,"fyVariance":-7.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The underspend was caused by:_x000D_ 1. The early completion of the feasibility stage of work on the NPR core (pre-Network North announcement) route._x000D_ 2. Re-planning and changes to work plans that were required to reflect the changes in scope following the Network North announcement.","wholeLifeCost":30600.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 increased from 17265m. to 30600m. This is primarily due to the following factors. This is due to the scope of NPR being expanded by the Network North announcement, including NPR becoming responsbile for a section of route between Liverpool and Manchester that would previously have been delivered by HS2 Phase 2b.","benefits":8007.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 2324-Q4 decreased from 19453m. to 8007m. Benefits have remained broafly flat since last reported, whilst the expansion in the geography and scope of NPR as part of Network North increased benefits, this has been offset by the removal of HS2 Phase 2b from the do-minimum scenario as well as the impact of long-term travel behaviour changes as a result of the Covid-19 pandemic, which was not included in previous forecasts.","themes":["Cost & funding","Scope & requirements","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. Following the Network North announcement in October 2023, the programme will need to fully revise the Strategic Outline Business Case (SOBC) to reflect the expanded…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 increased from 2045-01-01 to 2045-12-29. This is primarily due to the following factors. End date aligns with Integrated Rail Plan (IRP) target year of 2045. The project end date will be reassessed as part of the revision of the SOBC to reflect the additional Network North scope.","narrativeClaimKind":null},{"id":"DFT_0141_2223-Q1","year":2025,"name":"NORTHERN POWERHOUSE RAIL","department":"DfT","category":"Infrastructure and Construction","description":"Northern Powerhouse Rail (NPR) is the Government’s long-term programme to further improve rail connectivity in the North of England, building on the Transpennine Route Upgrade. it will provide faster and more frequent services between the key economic centres, including Liverpool, Manchester, Bradford, Leeds, Sheffield, and York; delivering improvements to rail capacity and journey times via electrified, upgraded, and new railway lines.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 changed from AMBER to RED. This reflects the position in March 2025, as at IPA’s last internal review point, before funding decisions were taken as part of the Spending Review and in advance of formal announcements about the forward programme. At Spending Review in June 2025, the government confirmed it will provide funding to progress this government’s long-term strategic rail ambitions, in the North of England. Work is ongoing to confirm funding decisions and government plans for NPR further to Spending Review.","startDate":"2016-06-01","endDate":"2045-12-29","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 29/12/2045. This is primarily due to the following factors‚ The current NPR programme baseline reflects the scope as originally established under the previous government. As the SR25 is expected to confirm a similar scope, the existing baseline remains broadly aligned. Following the conclusion of SR25, formal change control processes will be undertaken to update the baseline—primarily to reflect revised scheduling and delivery profiles.","fyBaseline":131.61,"fyForecast":80.59,"fyVariance":38.77,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The difference between cost baseline and actuals/forecasts is due to re-prioritisation/re-scope of work to accommodate financial pressures the Department had to face in FY24/25. Some projects have been either paused or delayed to remain within the available Departmental envelope. Future forecasts are subject to the outcome of the Spending Review 25 for which negotiations are currently ongoing as well as ministerial decisions on future scope and strategy for NPR.","wholeLifeCost":30600.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 30600. Once Ministerial decisions on the programme will be taken, the Whole Life Cost of the programme will be rebaselined.","benefits":8007.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 8007. Benefits remain unchanged but will be updated in the revised Programme Business Case being produced.","themes":["Cost & funding","Governance & assurance","Scope & requirements","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 changed from AMBER to RED. This reflects the position in March 2025, as at IPA’s last internal review point, before funding decisions were taken as part of the Spending Review and in advance of formal announcements about the forward…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 29/12/2045. This is primarily due to the following factors‚ The current NPR programme baseline reflects the scope as originally established under the previous government. As the SR25 is expected to confirm a similar scope, the existing baseline remains broadly aligned. Following the conclusion of SR25, formal change control processes will be undertaken to update the baseline—primarily to reflect revised scheduling and delivery profiles.","narrativeClaimKind":null},{"id":"DFT_0141_2223-Q1","year":2026,"name":"NORTHERN POWERHOUSE RAIL","department":"DFT","category":"Infrastructure and Construction","description":"Northern Powerhouse Rail (NPR) is the Government's long-term programme to further improve connectivity in the North of England as a fundamental part of the government's Northern Growth Strategy. Northern Powerhouse Rail aims to create a frequent and reliable turn-up-and-go railway service across the Northern Growth Corridor (including Liverpool, Manchester, Bradford, Leeds, Sheffield and York) with regular services continuing to Newcastle, Hull and Chester.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to the financial year 24/25 Q4, the NISTA Delivery Confidence Assessment rating at 25/26 Q4 has improved from Red to Amber. This improvement is primary a result of NPR receiving an agreed funding commitment in January 2026 of up to £45bn in 2025 prices, along with decisions on the single biggest scope choice in terms of the approach between Manchester and Liverpool and use of the Crewe-Manchester hybrid Bill.","startDate":"2016-02-01","endDate":"2051-12-31","scheduleNarrative":"Compared to the financial year 24/25 Q4 the NPR project end date has increased from December 2045 to December 2051. This reflects updates to the scope of the programme which had not been updated since the previous government's Network North Command Paper, and takes into account the planning which is forming the Programme Business Case.","fyBaseline":200.84,"fyForecast":60.67,"fyVariance":69.79,"varianceNarrative":"The budget variance for NPR for FY 25/26 has exceeded 5% which is a result of the following factors: The uncertainty around scope of the programme and direction of the hybrid Bill until January 2026 caused a number of previously planned activities to be either deferred into future financial years or removed from the scope of the programme; resulting in a reduction of spend from the previous programme baseline. The NPR Programme will formally rebaseline its cost profile following the completion of the Programme Business Case.","wholeLifeCost":45000.0,"costNarrative":"Compared to Financial Year 24/25-Q4 the programme's agreed whole life costs at Q4 25-26 (measured in £bn) has increased from 30.60 in 2019 prices to 45.00 in 2025 prices. This update reflects the agreed government upper limit funding profile which was announced as part of the Northern Powerhouse Rail announcement within the wider Northern Growth Strategy in January 2026. A refined cost profile for the programme will be developed following the completion of the Programme Business Case.","benefits":11629.06,"benefitsNarrative":"Compared to financial year 24/25-Q4, the programme's departmentally agreed Benefits at 25/26-Q4 (measured in £m in 2010/11 prices) remained at 8007. NPR benefits continue to remain unchanged pending an update as part of the Programme Business Case due later in the year. An updated benefits profile will be produced following the publication of the Programme Business Case","themes":["Cost & funding","Scope & requirements","Approvals & decisions","Delivery & schedule"],"evidenceExcerpt":"Compared to the financial year 24/25 Q4, the NISTA Delivery Confidence Assessment rating at 25/26 Q4 has improved from Red to Amber. This improvement is primary a result of NPR receiving an agreed funding commitment in January 2026 of up to £45bn in 2025 prices, along with decisions on the single biggest scope choice in terms of the approach between…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to the financial year 24/25 Q4 the NPR project end date has increased from December 2045 to December 2051. This reflects updates to the scope of the programme which had not been updated since the previous government's Network North Command Paper, and takes into account the planning which is forming the Programme Business Case.","narrativeClaimKind":null}],"previous":{"id":"DFT_0141_2223-Q1","year":2025,"name":"NORTHERN POWERHOUSE RAIL","department":"DfT","category":"Infrastructure and Construction","description":"Northern Powerhouse Rail (NPR) is the Government’s long-term programme to further improve rail connectivity in the North of England, building on the Transpennine Route Upgrade. it will provide faster and more frequent services between the key economic centres, including Liverpool, Manchester, Bradford, Leeds, Sheffield, and York; delivering improvements to rail capacity and journey times via electrified, upgraded, and new railway lines.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 changed from AMBER to RED. This reflects the position in March 2025, as at IPA’s last internal review point, before funding decisions were taken as part of the Spending Review and in advance of formal announcements about the forward programme. At Spending Review in June 2025, the government confirmed it will provide funding to progress this government’s long-term strategic rail ambitions, in the North of England. Work is ongoing to confirm funding decisions and government plans for NPR further to Spending Review.","startDate":"2016-06-01","endDate":"2045-12-29","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 29/12/2045. This is primarily due to the following factors‚ The current NPR programme baseline reflects the scope as originally established under the previous government. As the SR25 is expected to confirm a similar scope, the existing baseline remains broadly aligned. Following the conclusion of SR25, formal change control processes will be undertaken to update the baseline—primarily to reflect revised scheduling and delivery profiles.","fyBaseline":131.61,"fyForecast":80.59,"fyVariance":38.77,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The difference between cost baseline and actuals/forecasts is due to re-prioritisation/re-scope of work to accommodate financial pressures the Department had to face in FY24/25. Some projects have been either paused or delayed to remain within the available Departmental envelope. Future forecasts are subject to the outcome of the Spending Review 25 for which negotiations are currently ongoing as well as ministerial decisions on future scope and strategy for NPR.","wholeLifeCost":30600.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 30600. Once Ministerial decisions on the programme will be taken, the Whole Life Cost of the programme will be rebaselined.","benefits":8007.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 8007. Benefits remain unchanged but will be updated in the revised Programme Business Case being produced.","themes":["Cost & funding","Governance & assurance","Scope & requirements","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 changed from AMBER to RED. This reflects the position in March 2025, as at IPA’s last internal review point, before funding decisions were taken as part of the Spending Review and in advance of formal announcements about the forward…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 29/12/2045. This is primarily due to the following factors‚ The current NPR programme baseline reflects the scope as originally established under the previous government. As the SR25 is expected to confirm a similar scope, the existing baseline remains broadly aligned. Following the conclusion of SR25, formal change control processes will be undertaken to update the baseline—primarily to reflect revised scheduling and delivery profiles.","narrativeClaimKind":null},"ratingDelta":-1,"transition":"Improved","endDateDeltaDays":2193,"attentionScore":53,"attentionReasons":["Current published delivery confidence is Amber","Published end date moved 2,193 days later","In-year forecast variance is +69.8%"]},{"id":"MOJ_0365_2425-Q1","year":2026,"name":"PFI Prison Expiry and Transfer Tranche 3","department":"MOJ","category":"Government Transformation and Service Delivery","description":"The PFI Tranche 3 Project will oversee the exit and transfer of operational services at HMP Dovegate, HMP Doncaster, HMP Oakwood and HMP Rye Hill in a safe, effective and efficient manner. The Tranche 3 project includes the re-procurement of the Prison Operator Services Framework to ensure that HMPPS continues to have an efficient vehicle for delivering operator competitions. The project also includes delivery of up to 345 prisoner places through the construction of an additional houseblock at HMP & YOI Parc.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25-Q4, the NISTA Delivery Confidence Assessment (DCA) rating at 25/26-Q4 has remained at Amber. This is primarily due to the addition of the HMP Rye Hill houseblock to project scope, and ongoing costing and scheduling challenges which continue in HMP & YOI Parc.","startDate":"2022-12-15","endDate":"2029-07-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end date at 25/26-Q4 has increased from 28/01/28 to 31/07/29. This is primarily due to the addition of remaining HMP Rye Hill activity to project scope, and the need to finalise the schedule for the HMP & YOI Parc Houseblock.","fyBaseline":48.81,"fyForecast":8.71,"fyVariance":82.16,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to delays in the approval of the design and derogations for the HMP & YOI Parc Houseblock impacting schedule and forecasted spend for the previous financial year.","wholeLifeCost":3335.69,"costNarrative":"Compared to financial year 24/25-Q4, the project's Whole Life Costs at 25/26-Q4 decreased from £4,614.55m to £3,335.69m. This is primarily due to successful procurement competitions yielding savings against forecasted affordability thresholds. This figure does not reflect the transfer of HMP Rye Hill competition re-run. All costs have been reported in 2024/25 base prices in line with NISTA requirements. This is a change from previous years where costs were reported in nominal prices. All costs reflect this accounting reduction regardless of any actual changes.","benefits":null,"benefitsNarrative":"This project currently reports no monetised benefits. The project seeks to realise efficiencies in future operating costs following the transfer of service to new operator contracts when compared to the PFI contracts. The project benefits also include the focus on the continued quality of service across the PFI contracts until expiry, and following the transfer of service, improvements in service quality in the new contract in line with the key Departmental priorities.","themes":["Cost & funding","Delivery & schedule","Scope & requirements","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 24/25-Q4, the NISTA Delivery Confidence Assessment (DCA) rating at 25/26-Q4 has remained at Amber. This is primarily due to the addition of the HMP Rye Hill houseblock to project scope, and ongoing costing and scheduling challenges which continue in HMP & YOI Parc. Compared to financial year 24/25-Q4, the project's end date at…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end date at 25/26-Q4 has increased from 28/01/28 to 31/07/29. This is primarily due to the addition of remaining HMP Rye Hill activity to project scope, and the need to finalise the schedule for the HMP & YOI Parc Houseblock.","narrativeClaimKind":null,"history":[{"id":"MOJ_0365_2425-Q1","year":2025,"name":"PFI Prison Expiry and Transfer Tranche 3","department":"MoJ","category":"Government Transformation and Service Delivery","description":"The PFI Tranche 3 Project will oversee the exit and transfer of operational services at HMP Dovegate, HMP Doncaster and HMP Oakwood in a safe, effective and efficient manner. The Tranche 3 project includes the re-procurement of the Prison Operator Services Framework to ensure that HMPPS continues to have an efficient vehicle for delivering operator competitions. The project also includes delivery of additional places through the construction of an additional houseblock at HMP & YOI Parc.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER. This is due to‚ This is due to the limited contingency and complexity of the expiry and transfer activities still to be delivered.","startDate":"2022-12-15","endDate":"2028-01-28","scheduleNarrative":"The project's end-date at 24/25-Q4 is scheduled to be 28/01/2028. This is primarily due to the following factors‚ The project is on track to deliver against the baseline schedule.","fyBaseline":4.6,"fyForecast":4.88,"fyVariance":6.04,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ Changes in additional houseblock design following Outline Business Case approval.","wholeLifeCost":4614.55,"costNarrative":"The project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) is 4614. This is primarily due to the following factors‚ The Whole Life Costs are based on the most recent business case and include optimism bias.","benefits":0.0,"benefitsNarrative":"The project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) is 0. This is primarily due to the following factors‚ This project currently reports no monetised benefits. The project seeks to realise efficiencies in future operating costs following the transfer of service to new operator contracts when compared to the PFI contracts. The project benefits also include the focus on the continued quality of service across the PFI contracts until expiry, and following the transfer of service, improvements in service quality in the new contract in line with the key Departmental priorities.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Scope & requirements"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER. This is due to‚ This is due to the limited contingency and complexity of the expiry and transfer activities still to be delivered. The project's end-date at 24/25-Q4 is scheduled to be 28/01/2028. This is primarily due to the following factors‚ The project is…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 24/25-Q4 is scheduled to be 28/01/2028. This is primarily due to the following factors‚ The project is on track to deliver against the baseline schedule.","narrativeClaimKind":null},{"id":"MOJ_0365_2425-Q1","year":2026,"name":"PFI Prison Expiry and Transfer Tranche 3","department":"MOJ","category":"Government Transformation and Service Delivery","description":"The PFI Tranche 3 Project will oversee the exit and transfer of operational services at HMP Dovegate, HMP Doncaster, HMP Oakwood and HMP Rye Hill in a safe, effective and efficient manner. The Tranche 3 project includes the re-procurement of the Prison Operator Services Framework to ensure that HMPPS continues to have an efficient vehicle for delivering operator competitions. The project also includes delivery of up to 345 prisoner places through the construction of an additional houseblock at HMP & YOI Parc.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25-Q4, the NISTA Delivery Confidence Assessment (DCA) rating at 25/26-Q4 has remained at Amber. This is primarily due to the addition of the HMP Rye Hill houseblock to project scope, and ongoing costing and scheduling challenges which continue in HMP & YOI Parc.","startDate":"2022-12-15","endDate":"2029-07-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end date at 25/26-Q4 has increased from 28/01/28 to 31/07/29. This is primarily due to the addition of remaining HMP Rye Hill activity to project scope, and the need to finalise the schedule for the HMP & YOI Parc Houseblock.","fyBaseline":48.81,"fyForecast":8.71,"fyVariance":82.16,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to delays in the approval of the design and derogations for the HMP & YOI Parc Houseblock impacting schedule and forecasted spend for the previous financial year.","wholeLifeCost":3335.69,"costNarrative":"Compared to financial year 24/25-Q4, the project's Whole Life Costs at 25/26-Q4 decreased from £4,614.55m to £3,335.69m. This is primarily due to successful procurement competitions yielding savings against forecasted affordability thresholds. This figure does not reflect the transfer of HMP Rye Hill competition re-run. All costs have been reported in 2024/25 base prices in line with NISTA requirements. This is a change from previous years where costs were reported in nominal prices. All costs reflect this accounting reduction regardless of any actual changes.","benefits":null,"benefitsNarrative":"This project currently reports no monetised benefits. The project seeks to realise efficiencies in future operating costs following the transfer of service to new operator contracts when compared to the PFI contracts. The project benefits also include the focus on the continued quality of service across the PFI contracts until expiry, and following the transfer of service, improvements in service quality in the new contract in line with the key Departmental priorities.","themes":["Cost & funding","Delivery & schedule","Scope & requirements","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 24/25-Q4, the NISTA Delivery Confidence Assessment (DCA) rating at 25/26-Q4 has remained at Amber. This is primarily due to the addition of the HMP Rye Hill houseblock to project scope, and ongoing costing and scheduling challenges which continue in HMP & YOI Parc. Compared to financial year 24/25-Q4, the project's end date at…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end date at 25/26-Q4 has increased from 28/01/28 to 31/07/29. This is primarily due to the addition of remaining HMP Rye Hill activity to project scope, and the need to finalise the schedule for the HMP & YOI Parc Houseblock.","narrativeClaimKind":null}],"previous":{"id":"MOJ_0365_2425-Q1","year":2025,"name":"PFI Prison Expiry and Transfer Tranche 3","department":"MoJ","category":"Government Transformation and Service Delivery","description":"The PFI Tranche 3 Project will oversee the exit and transfer of operational services at HMP Dovegate, HMP Doncaster and HMP Oakwood in a safe, effective and efficient manner. The Tranche 3 project includes the re-procurement of the Prison Operator Services Framework to ensure that HMPPS continues to have an efficient vehicle for delivering operator competitions. The project also includes delivery of additional places through the construction of an additional houseblock at HMP & YOI Parc.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER. This is due to‚ This is due to the limited contingency and complexity of the expiry and transfer activities still to be delivered.","startDate":"2022-12-15","endDate":"2028-01-28","scheduleNarrative":"The project's end-date at 24/25-Q4 is scheduled to be 28/01/2028. This is primarily due to the following factors‚ The project is on track to deliver against the baseline schedule.","fyBaseline":4.6,"fyForecast":4.88,"fyVariance":6.04,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ Changes in additional houseblock design following Outline Business Case approval.","wholeLifeCost":4614.55,"costNarrative":"The project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) is 4614. This is primarily due to the following factors‚ The Whole Life Costs are based on the most recent business case and include optimism bias.","benefits":0.0,"benefitsNarrative":"The project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) is 0. This is primarily due to the following factors‚ This project currently reports no monetised benefits. The project seeks to realise efficiencies in future operating costs following the transfer of service to new operator contracts when compared to the PFI contracts. The project benefits also include the focus on the continued quality of service across the PFI contracts until expiry, and following the transfer of service, improvements in service quality in the new contract in line with the key Departmental priorities.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Scope & requirements"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER. This is due to‚ This is due to the limited contingency and complexity of the expiry and transfer activities still to be delivered. The project's end-date at 24/25-Q4 is scheduled to be 28/01/2028. This is primarily due to the following factors‚ The project is…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 24/25-Q4 is scheduled to be 28/01/2028. This is primarily due to the following factors‚ The project is on track to deliver against the baseline schedule.","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":550,"attentionScore":53,"attentionReasons":["Current published delivery confidence is Amber","Published end date moved 550 days later","In-year forecast variance is +82.2%"]},{"id":"MOD_0139_2122-Q1","year":2026,"name":"FUTURE CRUISE ANTI SHIP WEAPON (FCASW)","department":"MOD","category":"Military Capability","description":"This programme aims to achieve delivery of a next generation complex weapon for the UK to meet the RAF’s Selective Precision Effect At Range Capability 5 (SPEAR 5) and the Navy’s Future Offensive Surface Warfare (FOSuW) requirements. In doing so it is the cornerstone of UK / French bilateral cooperation as part of the ‘Lancaster House Treaty’, which now includes Italy as a full partner and ensures UK Freedom of Action, Operational Advantage, prosperity and critical UK industrial capability in the complex weapons arena.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Exempt under Section 43 - Commercial interests","startDate":"2017-07-01","endDate":"2070-03-01","scheduleNarrative":"Exempt under Section 43 - Commercial interests","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Commercial & supply chain"],"evidenceExcerpt":"Exempt under Section 43 - Commercial interests Exempt under Section 43 - Commercial interests","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 43 - Commercial interests","narrativeClaimKind":null,"history":[{"id":"MOD_0139_2122-Q1","year":2022,"name":"Future Cruise Anti Ship Weapon (FCASW)","department":"MOD","category":"Military Capability","description":"The Future Cruise Anti Ship Weapon programme aims to deliver a next generation complex weapon to meet the UK's Selective Precision Effect At Range Capability 5 and Future Offensive Surface Warfare requirements. In doing so it is the cornerstone of UK/Fr bilateral cooperation as part of the 'Lancaster House Treaty' and supports UK Freedom of Action, prosperity and critical UK industrial capability.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"The Future Cruise Anti Ship Weapon Programme was previously contained within the Complex Weapons Portfolio and has been extracted to allow for better targeted approval and assurance processes. As such it is not possible to comment on its Delivery Confidence in March 21. However, it is currently assessed as Red while the Senior Responsible Owner and Programme Team install revised Governance arrangements and recruit a larger programme team. Delivery Confidence is expected to increase in the first quarter of 2022/23","startDate":"2017-03-01","endDate":"2070-03-01","scheduleNarrative":"The Future Cruise Anti Ship Weapon Programme was previously contained within the Complex Weapons Portfolio and has been extracted to allow for better targeted approval and assurance processes. As such there is no baseline date recorded for March 21 for comparison. However, it is currently forecast to end in March 70","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests)","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests)","benefits":null,"benefitsNarrative":"","themes":["Governance & assurance","Approvals & decisions","Commercial & supply chain","Delivery & schedule"],"evidenceExcerpt":"The Future Cruise Anti Ship Weapon Programme was previously contained within the Complex Weapons Portfolio and has been extracted to allow for better targeted approval and assurance processes. As such it is not possible to comment on its Delivery Confidence in March 21. However, it is currently assessed as Red while the Senior Responsible Owner and…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The Future Cruise Anti Ship Weapon Programme was previously contained within the Complex Weapons Portfolio and has been extracted to allow for better targeted approval and assurance processes. As such there is no baseline date recorded for March 21 for comparison. However, it is currently forecast to end in March 70","narrativeClaimKind":null},{"id":"MOD_0139_2122-Q1","year":2023,"name":"Future Cruise Anti Ship Weapon (FCASW)","department":"MOD","category":"Military Capability","description":"The Future Cruise Anti Ship Weapon programme aims to deliver a next generation complex weapon to meet the UK's Selective Precision Effect At Range Capability 5 (SPEAR 5) and Future Offensive Surface Warfare (FOSuW) requirements. In doing so it is the cornerstone of UK/Fr bilateral cooperation as part of the 'Lancaster House Treaty' and supports UK Freedom of Action, prosperity and critical UK industrial capability.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 increased from Red (IPA rating) to Amber (SRO rating). This is primarily due to the following factors. The Programme is half-way through a 3-year Assessment Phase; the Assessment Phase remains on track with a range of concepts and options being matured to support choice and inform future decisions. The programme is assessed as Amber whilst the long-term deliverability of these choices is fully explored.","startDate":"2017-07-01","endDate":"2070-03-01","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2070-03-01. This is primarily due to the following factors. This is an indicative date, and a final programme end-date will be provided at Full Business Case.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This programme does not report cashable benefits. Its aim is to provision the armed forces with the equipment and / or infrastructure required.","themes":["Commercial & supply chain","Cost & funding","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 increased from Red (IPA rating) to Amber (SRO rating). This is primarily due to the following factors. The Programme is half-way through a 3-year Assessment Phase; the Assessment Phase remains on track with a range of concepts and options being matured to support…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2070-03-01. This is primarily due to the following factors. This is an indicative date, and a final programme end-date will be provided at Full Business Case.","narrativeClaimKind":null},{"id":"MOD_0139_2122-Q1","year":2024,"name":"Future Cruise Anti Ship Weapon (FCASW)","department":"MOD","category":"Military Capability","description":"This programme aims to achieve delivery of a next generation complex weapon for the UK to meet the RAF’s Selective Precision Effect At Range Capability 5 (SPEAR 5) and the Navy’s Future Offensive Surface Warfare requirements. In doing so it is the cornerstone of UK / French bilateral cooperation as part of the ‘Lancaster House Treaty’ and supports UK Freedom of Action, Operational Advantage, prosperity and critical UK industrial capability in the complex weapons arena.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure and Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The programme is two thirds of the way through the Assessment Phase with evaluation of all the potential options available on track. The programme remains on course to deliver this phase to within the current approvals envelope regarding cost and time. The Delivery Confidence Assessment of AMBER was also endorsed by an IPA Assurance Review in December 2023.","startDate":"2017-07-01","endDate":"2037-12-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 decreased from 2070-03-01 to 2037-12-31. This is primarily due to the following factors. The previous date provided was the Out of Service Date. To achieve consistency with all other performance reporting the project end data has been used for this year.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":0.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 0m.","themes":["Commercial & supply chain","Cost & funding","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure and Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The programme is two thirds of the way through the Assessment Phase with evaluation of all the potential options available on track. The programme remains on…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 decreased from 2070-03-01 to 2037-12-31. This is primarily due to the following factors. The previous date provided was the Out of Service Date. To achieve consistency with all other performance reporting the project end data has been used for this year.","narrativeClaimKind":null},{"id":"MOD_0139_2122-Q1","year":2025,"name":"FUTURE CRUISE ANTI SHIP WEAPON (FCASW)","department":"MoD","category":"Military Capability","description":"This programme aims to achieve delivery of a next generation complex weapon for the UK to meet the RAF’s Selective Precision Effect At Range Capability 5 (SPEAR 5) and the Navy’s Future Offensive Surface Warfare (FOSuW) requirements. In doing so it is the cornerstone of UK / French bilateral cooperation as part of the ‘Lancaster House Treaty’ and supports UK Freedom of Action, Operational Advantage, prosperity and critical UK industrial capability in the complex weapons arena.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. This is because of uncertainty regarding the whole life costs from the next phase of delivery which have increased (including drivers from prevailing economic conditions). In addition, there are concerns that the programme may not meet all extant key user requirements. However, the programme has maintained its rating of Amber Compared to 12 months ago, as it completed the full scope of work for the original Assessment Phase by November 24 on time and budget. Although uncertainty with approvals has delayed the submission of the Review Note to May 25, a Continuation of Spend will maintain contract coverage to Jun 25 and has protected the delivery schedule.","startDate":"2017-07-01","endDate":"2043-04-30","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 decreased from 31/12/2037 to 25/04/2025. This is primarily due to the following factors. This takes into account the anticipated completion of delivery of munitions and the transition of the capability to solely in-service support. The reported delay to 2043 also recognises the funded position of the programme throughout the upcoming Demonstration and Manufacturing phase. The reported dates are subject to the approval of the Full Business Case anticipated in 2026. It should also be noted that deliveries of stock to international partners could alter the assumed delivery rates for the munitions.","fyBaseline":227.76,"fyForecast":185.03,"fyVariance":18.76,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. This is because of the delays to the French RJ10 (RamJet 10) project. With no contract in place for the next phase between the DGA (Direction generale de l'armement) and MBDA France, the expected costs to the UK have not occurred.","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits","themes":["Delivery & schedule","Cost & funding","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. This is because of uncertainty regarding the whole life costs from the next phase of delivery which have increased (including drivers from prevailing economic conditions). In addition, there are…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 decreased from 31/12/2037 to 25/04/2025. This is primarily due to the following factors. This takes into account the anticipated completion of delivery of munitions and the transition of the capability to solely in-service support. The reported delay to 2043 also recognises the funded position of the programme throughout the upcoming Demonstration and Manufacturing phase. The reported dates are subject to the approval of the Full Business Case anticipated in 2026. It should also be noted that deliveries of stock to international partners could alter the assumed delivery rates for the munitions.","narrativeClaimKind":null},{"id":"MOD_0139_2122-Q1","year":2026,"name":"FUTURE CRUISE ANTI SHIP WEAPON (FCASW)","department":"MOD","category":"Military Capability","description":"This programme aims to achieve delivery of a next generation complex weapon for the UK to meet the RAF’s Selective Precision Effect At Range Capability 5 (SPEAR 5) and the Navy’s Future Offensive Surface Warfare (FOSuW) requirements. In doing so it is the cornerstone of UK / French bilateral cooperation as part of the ‘Lancaster House Treaty’, which now includes Italy as a full partner and ensures UK Freedom of Action, Operational Advantage, prosperity and critical UK industrial capability in the complex weapons arena.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Exempt under Section 43 - Commercial interests","startDate":"2017-07-01","endDate":"2070-03-01","scheduleNarrative":"Exempt under Section 43 - Commercial interests","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Commercial & supply chain"],"evidenceExcerpt":"Exempt under Section 43 - Commercial interests Exempt under Section 43 - Commercial interests","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 43 - Commercial interests","narrativeClaimKind":null}],"previous":{"id":"MOD_0139_2122-Q1","year":2025,"name":"FUTURE CRUISE ANTI SHIP WEAPON (FCASW)","department":"MoD","category":"Military Capability","description":"This programme aims to achieve delivery of a next generation complex weapon for the UK to meet the RAF’s Selective Precision Effect At Range Capability 5 (SPEAR 5) and the Navy’s Future Offensive Surface Warfare (FOSuW) requirements. In doing so it is the cornerstone of UK / French bilateral cooperation as part of the ‘Lancaster House Treaty’ and supports UK Freedom of Action, Operational Advantage, prosperity and critical UK industrial capability in the complex weapons arena.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. This is because of uncertainty regarding the whole life costs from the next phase of delivery which have increased (including drivers from prevailing economic conditions). In addition, there are concerns that the programme may not meet all extant key user requirements. However, the programme has maintained its rating of Amber Compared to 12 months ago, as it completed the full scope of work for the original Assessment Phase by November 24 on time and budget. Although uncertainty with approvals has delayed the submission of the Review Note to May 25, a Continuation of Spend will maintain contract coverage to Jun 25 and has protected the delivery schedule.","startDate":"2017-07-01","endDate":"2043-04-30","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 decreased from 31/12/2037 to 25/04/2025. This is primarily due to the following factors. This takes into account the anticipated completion of delivery of munitions and the transition of the capability to solely in-service support. The reported delay to 2043 also recognises the funded position of the programme throughout the upcoming Demonstration and Manufacturing phase. The reported dates are subject to the approval of the Full Business Case anticipated in 2026. It should also be noted that deliveries of stock to international partners could alter the assumed delivery rates for the munitions.","fyBaseline":227.76,"fyForecast":185.03,"fyVariance":18.76,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. This is because of the delays to the French RJ10 (RamJet 10) project. With no contract in place for the next phase between the DGA (Direction generale de l'armement) and MBDA France, the expected costs to the UK have not occurred.","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits","themes":["Delivery & schedule","Cost & funding","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. This is because of uncertainty regarding the whole life costs from the next phase of delivery which have increased (including drivers from prevailing economic conditions). In addition, there are…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 decreased from 31/12/2037 to 25/04/2025. This is primarily due to the following factors. This takes into account the anticipated completion of delivery of munitions and the transition of the capability to solely in-service support. The reported delay to 2043 also recognises the funded position of the programme throughout the upcoming Demonstration and Manufacturing phase. The reported dates are subject to the approval of the Full Business Case anticipated in 2026. It should also be noted that deliveries of stock to international partners could alter the assumed delivery rates for the munitions.","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":9802,"attentionScore":52,"attentionReasons":["Current published delivery confidence is Amber","Published end date moved 9,802 days later","In-year forecast variance is +43.0%"]},{"id":"HO_0332_2324-Q4","year":2026,"name":"NATIONAL STRATEGIC AUTOMATIC NUMBER PLATE RECOGNITION PLATFORM (NSAP)","department":"HO","category":"Government Transformation and Service Delivery","description":"The National ANPR (Automatic Number Plate Recognition) Capability provides lines of enquiry and evidence in the investigation of crime and is used by forces throughout England, Wales and Scotland as well as approved Law Enforcement Agencies. The National Strategic ANPR Platform (NSAP) Programme is delivering the next generation of data store, integration and application capabilities to support Police and Law Enforcement in their public protection missions.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Exempt under Section 31 (1) - Law enforcement","startDate":"2023-03-01","endDate":"2030-03-30","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remains the same date (29/03/30)","fyBaseline":39.03,"fyForecast":36.73,"fyVariance":5.91,"varianceNarrative":"The budget variance only just exceeds 5%. This is primarily due to unforeseen pressures influencing in year forecasting.","wholeLifeCost":391.77,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 decreased from last year's WLC. This is primarily due to the reduction of the Optimism Bias.","benefits":35.68,"benefitsNarrative":"Exempt under Section 31 (1) - Law enforcement","themes":["Cost & funding"],"evidenceExcerpt":"Exempt under Section 31 (1) - Law enforcement Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remains the same date (29/03/30)","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":true,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remains the same date (29/03/30)","narrativeClaimKind":"says-unchanged","history":[{"id":"HO_0332_2324-Q4","year":2024,"name":"National Strategic Automatic Number Plate Recognition Platform (NSAP)","department":"HO","category":"Government Transformation and Service Delivery","description":"The National Automatic Number Plate Recognition Service (NAS) is a police critical national system enabling policing and Law Enforcement Agencies to have the right information on time for intelligence on vehicle activity across the country and to effectively use it to protect the public, prevent crime in some instances and use the evidence for convictions in court. This intelligence also supports National Counter Terrorism, County Lines, and Serious and Organised Crime investigations. _x000D_ NAS are in the early stages of setting up a new programme to deliver a new solution to replace the legacy system and enabling continuation of the NAS service.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. The programme is currently engaging with stakeholders to develop the scope of the future road map. Discussions are due to begin with the existing supplier to develop the exit and decommissioning strategy for the legacy technology. Programme plan for future delivery phases will be developed in line with the future road map and the programme team structure will be revisited to ensure sufficient expertise and resilience. Work is underway to review the existing governance framework to ensure it is clearly understood by key stakeholders.","startDate":"2023-03-01","endDate":"2028-03-30","scheduleNarrative":"The project's end-date at 23/24-Q4 is 2028-03-30. This is primarily due to the following factors. The programme is currently on schedule to complete by March 2028. The Phase one delivery had moved 8 weeks however this has not impacted on phase two which is due to deliver in October 2024. Commercial activity is underway to deliver the commercial retender exercise by March 2025 to identify the future service provider.","fyBaseline":28.57,"fyForecast":25.81,"fyVariance":-10.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. Budget/ Forecast variance is currently less than 2%","wholeLifeCost":284.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 23/24-Q4 is 284m. This is primarily due to the following factors. The whole Life costs include the transition from legacy technology to cloud with an evergreening support model, reducing technical debt and enabling future enhancements through exploiting technical advances. The costs include the potential dual running costs to facilitate transition.","benefits":0.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 0m. There are currently no identified financial benefits as this system is replacing Police critical national infrastructure in order to maintain existing capability. There are however non monetised benefits that are being discussed and mapped and require a stakeholder sign up to monitoring these benefits before we can start reporting them further details are with the programme.","themes":["Cost & funding","Delivery & schedule","Technical & integration","Commercial & supply chain"],"evidenceExcerpt":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. The programme is currently engaging with stakeholders to develop the scope of the future road map. Discussions are due to begin with the existing supplier to develop the exit and decommissioning strategy for the legacy…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 23/24-Q4 is 2028-03-30. This is primarily due to the following factors. The programme is currently on schedule to complete by March 2028. The Phase one delivery had moved 8 weeks however this has not impacted on phase two which is due to deliver in October 2024. Commercial activity is underway to deliver the commercial retender exercise by March 2025 to identify the future service provider.","narrativeClaimKind":null},{"id":"HO_0332_2324-Q4","year":2025,"name":"NATIONAL STRATEGIC AUTOMATIC NUMBER PLATE RECOGNITION PLATFORM (NSAP)","department":"HO","category":"Government Transformation and Service Delivery","description":"The National Strategic Automatic Number Plate Recognition Service ANPR (Automatic Number Plate Recognition) technology is used to help detect, deter and disrupt criminal activity at a local, regional and national level. It brings together a constant stream of live data from all police forces and a few Law Enforcement Agencies (LEAs). This data is fed into a central database and allows for various interrogations to be made against the data producing the results in the form of real time alerts, near real time searches and historic searching for vehicles of interest. This enables policing/LEAs to have the right information on time for intelligence on vehicle activity across the country and to effectively use it to protect the public, prevent crime and use the evidence for convictions in court.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Whilst there have been significant improvements with stakeholder engagement there are further work needed in this area. There are improvements required around planning, dependencies and programme governance. The review acknowledged the commitment of all the stakeholders to remaining delivery and congratulated the team on delivering the platform.","startDate":"2023-03-01","endDate":"2028-03-30","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 30/03/2028. This is primarily due to the following factors‚ The programme is still on track to deliver within the overall timelines.","fyBaseline":43.46,"fyForecast":29.86,"fyVariance":31.29,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The data feed project was delayed by 12 months due to issues identified resulting in a extended testing period.","wholeLifeCost":538.9,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 284 to 538. This is primarily due to the following factors‚ The Q4 FY23/24 Whole Life Cost of £284m does not include Optimism Bias. With Optimism Bias, the Whole Life Cost should be £609.63M. The Q4 FY2425 WLC should be £552.51m (incl OB) as reported on GRIP for that period. The drop in the WLC from Q4 FY2324 and Q4 FY2425 relates to the reduction of the Optimism Bias as many risks have been mitigated since plus revised assumptions and costs.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ Agreed Benefits remain at 0 as Benefits are not realised in this financial year","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Technical & integration"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Whilst there have been significant improvements with stakeholder engagement there are further work needed in this area. There are improvements required around…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 30/03/2028. This is primarily due to the following factors‚ The programme is still on track to deliver within the overall timelines.","narrativeClaimKind":null},{"id":"HO_0332_2324-Q4","year":2026,"name":"NATIONAL STRATEGIC AUTOMATIC NUMBER PLATE RECOGNITION PLATFORM (NSAP)","department":"HO","category":"Government Transformation and Service Delivery","description":"The National ANPR (Automatic Number Plate Recognition) Capability provides lines of enquiry and evidence in the investigation of crime and is used by forces throughout England, Wales and Scotland as well as approved Law Enforcement Agencies. The National Strategic ANPR Platform (NSAP) Programme is delivering the next generation of data store, integration and application capabilities to support Police and Law Enforcement in their public protection missions.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Exempt under Section 31 (1) - Law enforcement","startDate":"2023-03-01","endDate":"2030-03-30","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remains the same date (29/03/30)","fyBaseline":39.03,"fyForecast":36.73,"fyVariance":5.91,"varianceNarrative":"The budget variance only just exceeds 5%. This is primarily due to unforeseen pressures influencing in year forecasting.","wholeLifeCost":391.77,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 decreased from last year's WLC. This is primarily due to the reduction of the Optimism Bias.","benefits":35.68,"benefitsNarrative":"Exempt under Section 31 (1) - Law enforcement","themes":["Cost & funding"],"evidenceExcerpt":"Exempt under Section 31 (1) - Law enforcement Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remains the same date (29/03/30)","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":true,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remains the same date (29/03/30)","narrativeClaimKind":"says-unchanged"}],"previous":{"id":"HO_0332_2324-Q4","year":2025,"name":"NATIONAL STRATEGIC AUTOMATIC NUMBER PLATE RECOGNITION PLATFORM (NSAP)","department":"HO","category":"Government Transformation and Service Delivery","description":"The National Strategic Automatic Number Plate Recognition Service ANPR (Automatic Number Plate Recognition) technology is used to help detect, deter and disrupt criminal activity at a local, regional and national level. It brings together a constant stream of live data from all police forces and a few Law Enforcement Agencies (LEAs). This data is fed into a central database and allows for various interrogations to be made against the data producing the results in the form of real time alerts, near real time searches and historic searching for vehicles of interest. This enables policing/LEAs to have the right information on time for intelligence on vehicle activity across the country and to effectively use it to protect the public, prevent crime and use the evidence for convictions in court.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Whilst there have been significant improvements with stakeholder engagement there are further work needed in this area. There are improvements required around planning, dependencies and programme governance. The review acknowledged the commitment of all the stakeholders to remaining delivery and congratulated the team on delivering the platform.","startDate":"2023-03-01","endDate":"2028-03-30","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 30/03/2028. This is primarily due to the following factors‚ The programme is still on track to deliver within the overall timelines.","fyBaseline":43.46,"fyForecast":29.86,"fyVariance":31.29,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The data feed project was delayed by 12 months due to issues identified resulting in a extended testing period.","wholeLifeCost":538.9,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 284 to 538. This is primarily due to the following factors‚ The Q4 FY23/24 Whole Life Cost of £284m does not include Optimism Bias. With Optimism Bias, the Whole Life Cost should be £609.63M. The Q4 FY2425 WLC should be £552.51m (incl OB) as reported on GRIP for that period. The drop in the WLC from Q4 FY2324 and Q4 FY2425 relates to the reduction of the Optimism Bias as many risks have been mitigated since plus revised assumptions and costs.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ Agreed Benefits remain at 0 as Benefits are not realised in this financial year","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Technical & integration"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Whilst there have been significant improvements with stakeholder engagement there are further work needed in this area. There are improvements required around…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 30/03/2028. This is primarily due to the following factors‚ The programme is still on track to deliver within the overall timelines.","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":730,"attentionScore":52,"attentionReasons":["Published commentary says the end date is unchanged while the published date moved","Current published delivery confidence is Amber","Published end date moved 730 days later","In-year forecast variance is +5.9%"]},{"id":"BEIS_0014_2021-Q4","year":2026,"name":"SOCIAL HOUSING DECARBONISATION FUND","department":"DESNZ","category":"Infrastructure and Construction","description":"The SHDF capital programme, which includes new projects delivering as the Warm Homes: Social Housing Fund since April 2025, is designed to improve the energy performance of social housing through targeted investment and collaborative engagement with social housing landlords, funding the installation of energy efficiency measures and low-carbon technologies in social homes. SHDF began delivery in 2021 through the SHDF Demonstrator, and the latest project, WH:SHF Wave 3, begun in Spring 2025.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 remains at Amber. This reflects sustained delivery progress across the programme, effective management of previously identified risks, and increased confidence in the programme’s ability to deliver its objectives within agreed parameters. In particular, the programme successfully launched a new scheme (Wave 3) and is forecasting to have delivered nearly all of its capital budget for 25/26. The overall programme reached a notable milestone, with the 100,000th energy efficiency measure installed during 25/26, demonstrating the scale and impact of the scheme to date. Wave 2 concluded delivery on the majority of projects, with residual activity focused on formal closure, reconciliation, and assurance processes agreed for the first quarter of 26/27. The Wave 2 project is on track to meet FBC targets. Wave 3 entered active delivery with all Grant Funding Agreements in place and projects progressing through delivery phases as planned. Delivery momentum strengthened during the year, evidenced by increased grant drawdowns and phase requests, demonstrating that projects are mobilised and delivering at scale. As at end of March, the delivery team are confident that close to the capital budget was successfully spent by grant recipients. Programme governance and controls continued to mature over the reporting period, with progress made in addressing assurance recommendations, improving data quality and reporting, and embedding lessons learned from earlier waves. The programme received a joint Amber at Gateway 3 assurance in Q4. Overall, the Green DCA rating for 25/26 reflects the demonstrable delivery progress on both outcomes and financial outturn. Sustaining this delivery confidence will only be possible if the programme receives strong support for resourcing needs, with proactive support as part of wider departmental transformation taking place in Q1/Q2.","startDate":"2020-09-09","endDate":"2030-03-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same.","fyBaseline":332.82,"fyForecast":332.43,"fyVariance":0.12,"varianceNarrative":"The budget variance is less than 5%, due to tight forecasting controls","wholeLifeCost":2256.29,"costNarrative":"Baseline WLC remain unchanged as per the latest agreed business case.","benefits":5582.9,"benefitsNarrative":"The project's departmentally agreed Benefits for 25/26-Q4 have not changed.","themes":["Delivery & schedule","Cost & funding","Governance & assurance","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 24/25, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 remains at Amber. This reflects sustained delivery progress across the programme, effective management of previously identified risks, and increased confidence in the programme’s ability to deliver its objectives within agreed parameters. In particular, the…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":true,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same.","narrativeClaimKind":"says-unchanged","history":[{"id":"BEIS_0014_2021-Q4","year":2021,"name":"Social Housing Decarbonisation Fund","department":"BEIS","category":"Infrastructure and Construction","description":"The programme will play a key role in decarbonising social housing over the 2020s, aligning with a number of government and departmental outcomes to help achieve legally binding carbon and fuel poverty targets.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber.This is primarily due to the following factors: Whilst near-term milestones are being met, a number of medium to long-range risks are impacting delivery confidence. Firstly, the Programme team remains under-strength as is enters an intense 12 months period in which it is necessary to undertake major approval and assurance work for both the first two delivery phases and the Programme's Technical Assistance Facility. Secondly, funding for the first phase (Wave 1) commencing delivery in early 2022 has recently been increased from �60m to �160m, adding pressure onto short resources and the necessarily fixed final approval deadline. Finally, the absence of longer term funding certainty beyond Financial Year 21/22 constrains the Fund's ability to signal the degree of confidence needed for the retrofit supply chain to grow sufficiently to meet the cumulative high demand of this and other schemes from 2023 onwards. All risks are being actively mitigated.","startDate":"2020-09-09","endDate":"2030-03-31","scheduleNarrative":"The project end-date is 31 March 2030. This is primarily due to the following factors: The planned schedule for the Programme's first phase (Wave 1) must achieve final approval to proceed in Nov 21 in order that the associated �160m of Financial Year (FY) 21/22 grant funding to Local Authorities is transferred as stipulated within the FY; for the winning projects to be delivered in FY22/23. The larger 3-year second phase (Wave 2) of c�1.1bn is scheduled to achieve final approval as early as feasible in FY 22/23 to maximise period of delivery in order to achieve the planned activity and funding for that year. Any delay to this schedule will be due to selection of an alternative delivery method for this first major wave that that is deemed more effect than the current approach involving award and transfer of grants to Local Authorities.","fyBaseline":55.83,"fyForecast":63.48,"fyVariance":14.0,"varianceNarrative":"The budget variance exceeds 5%. Against our agreed FY 20/21 baseline of �55.82m we were able to agree more CDEL funding through the supplementary estimates process to take forward 3 additional projects","wholeLifeCost":4626.29,"costNarrative":"The projects Baseline Whole Life Cost is �4626.29m. This is primarily due to the following factors: The Programme Whole Life Costs include the capital cost for the programme (�3.8bn ex Vat at 2019 prices) + the costs for the BEIS Integrated Project Delivery Team (administration budget) and programme costs for external delivery and monitoring and evaluation partners.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber.This is primarily due to the following factors: Whilst near-term milestones are being met, a number of medium to long-range risks are impacting delivery confidence. Firstly, the Programme team remains under-strength as is enters an intense 12 months period in which it is…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project end-date is 31 March 2030. This is primarily due to the following factors: The planned schedule for the Programme's first phase (Wave 1) must achieve final approval to proceed in Nov 21 in order that the associated �160m of Financial Year (FY) 21/22 grant funding to Local Authorities is transferred as stipulated within the FY; for the winning projects to be delivered in FY22/23. The larger 3-year second phase (Wave 2) of c�1.1bn is scheduled to achieve final approval as early as feasible in FY 22/23 to maximise period of delivery in order to achieve the planned activity and funding for that year. Any delay to this schedule will be due to selection of an alternative delivery method for this first major wave that that is deemed more effect than the current approach involving award and transfer of grants to Local Authorities.","narrativeClaimKind":null},{"id":"BEIS_0014_2021-Q4","year":2022,"name":"Social Housing Decarbonisation Fund","department":"BEIS","category":"Infrastructure and Construction","description":"The 2019 Conservative Manifesto committed to a £3.8bn Social Housing Decarbonisation Fund over a 10-year period. SHDF will support the ambition set out in the Clean Growth Strategy, that as many homes as possible are improved to Energy Performance Certificate (EPC) band C by 2035, and for all fuel-poor homes to reach this target by 2030. SHDF will play a critical role in meeting legally binding fuel poverty targets as set out in the Fuel Poverty Strategy. Owing to the proposed length of the scheme, and the uncertainty in the decarbonisation environment (e.g., electrification/hydrogen decision ), SHDF will be delivered in four waves. SHDF Wave 1 commitments will build on the findings of the SHDF Demonstrator project, scaling up supply chain capacity and knowledge as in advance of the larger, longer-term Wave 2 which has recently been confirmed in Spending Review 21.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 remained at Amber \"Programme: The programme team continues to grow in both capacity and capability in the context of a complicated programme. The CSR 21 provides certainty for the program over the next 3 years but the programme is seeking to expand the commitment to cover the totality of Wave 2 whilst providing certainty for future waves. The demonstrator project is currently preparing for closure later in financial year 22/23 and learning the appropriate lessons from there remains a priority. Wave 1: All MoUs have been signed, returned and the grant funding issued by the end of March 2023. A total of around £179.5m was sent to 69 Local Authorities and delivery on those projects has commenced. The Wave 1 Project hosted a launch conference (Energise) in March 2023 to build momentum and kick start the delivery of the projects. The fist monthly report was due for submission on the 10th working day of April, and the DSAs are continued to be signed and returned. To date 55/69 DSAs are completed. Wave 2: Work is underway to cement the policy position for Wave 2 in advance of the OBC in June which will then be followed by the launch of the competition in August. \" SHDF Wave 1 Project underwent an IPA Gate 3 review in November 2021, receiving a Red Rating. An assurance of action plan (AAP) was developed addressing 9 key recommendations and 3 blockers. The Wave 1 Project underwent a Gate 3 re-review in January 2022, receiving an Amber rating. Five key recommendations were fully addressed as part of the AAP, four actions required further attention. Since January, two further recommendations have been closed through the passing of PIC and by fully resourcing the team, leaving 2 recommendations (supply chain capacity and delivery plans) ongoing. These actions are currently progressing and will continue throughout the delivery of the Project.","startDate":"2020-09-09","endDate":"2030-03-31","scheduleNarrative":"Compared to 2021-Q4, your project end-date remained scheduled to finish on 31 MAR 2030 . This is primarily due to the following factors: The Wave 1 Project issued £187.5m grant funding prior to the end of the financial year and delivery has commenced on those projects. Wave 2 currently remains on track to deliver financial payments as planned.","fyBaseline":65.33,"fyForecast":184.77,"fyVariance":185.0,"varianceNarrative":"The budget variance exceeds 5%. The budget variance exceeds 5%. This is primarily due to the initial agreed baseline for FY21/22 being £160m. However, in September 21, due to the high number of good bids received for SHDF W1, this amount increased to c£180m. It was agreed that the under-spend in other EEL Schemes would cover the overspend in SHDF, allowing the team to fund a great number of projects. The team was able to spend all this amount by the end of FY21/22, after funding all predicted LA Projects successfully through Section 31.","wholeLifeCost":4721.0,"costNarrative":"Compared to2021-Q4, the projects Baseline Whole Life Cost increased from 4626.29 (£m) to 4720.96 (£m). This is primarily due to the following factors: An increased allocation to the Wave 1 project due to high number of bids received. Also an increased Programme Admin costs due to more resources required to deliver the programme; the SHDF team has informed Central Finance of the potential Admin overspend from the beginning of the FY21/22.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Workforce & capability","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 remained at Amber \"Programme: The programme team continues to grow in both capacity and capability in the context of a complicated programme. The CSR 21 provides certainty for the program over the next 3 years but the programme is…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to 2021-Q4, your project end-date remained scheduled to finish on 31 MAR 2030 . This is primarily due to the following factors: The Wave 1 Project issued £187.5m grant funding prior to the end of the financial year and delivery has commenced on those projects. Wave 2 currently remains on track to deliver financial payments as planned.","narrativeClaimKind":null},{"id":"BEIS_0014_2021-Q4","year":2023,"name":"Social Housing Decarbonisation Fund","department":"DESNZ","category":"Infrastructure and Construction","description":"The 2019 Conservative Manifesto committed to a 3.8bn Social Housing Decarbonisation Fund over a 10-year period. SHDF will support the ambition set out in the Clean Growth Strategy, that as many homes as possible are improved to Energy Performance Certificate (EPC) band C by 2035, and for all fuel-poor homes to reach this target by 2030. SHDF will play a critical role in meeting legally binding fuel poverty targets as set out in the Fuel Poverty Strategy. Owing to the proposed length of the scheme, and the uncertainty in the decarbonisation environment (e.g., electrification/hydrogen decision ), SHDF will be delivered in four waves. SHDF Wave 1 commitments will build on the findings of the SHDF Demonstrator project, scaling up supply chain capacity and knowledge as in advance of the larger, longer-term Wave 2 which has recently concluded its first and major competition phase, with successful bids under Wave 2.1 announced in March 2023.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. There has been considerable progress on the SHDF Programme over 22/23. The Programme is well placed to deliver whilst recognising risks on mobilisation, cost and quality on Wave 1 and Wave 2. The Demonstrator in the last quarter of 22/23 achieved a green at Gateway 5 confirming the benefits/learning it provided to the longer-term direction of the SHDF Programme. Wave 1 issued 187.5 million in grant funding prior to the start of 22/23 with delivery continuing throughout this year. In Q4, Wave1 re-baselined following HMT approval for the grant spend window to extend to the end of June 2023.On Wave 2, a competition launched in Autumn 2022, the outcome of which was the award of 778m of grant funding to 107 projects, with a further 1.1bn committed as match funding. A Delivery Agent (Salix Finance) is in place to support delivery, alongside a Delivery Partner which has been procured with contract award expected to be in late April 23.","startDate":"2020-09-09","endDate":"2030-03-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2030-03-31. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2030-03-31. This is primarily due to the following factors. The SHDF programme continues to deliver and, subject to funding being allocated at a future fiscal event, it is expected to continue to deliver to the Programme end date in 2030. The Demonstrator is formally closing as a project, Wave 1 delivery continues as planned with delivery expected to be completed in 2023 and Wave 2 delivery commences at the start of financial year 23/24 for delivery through to 2025.","fyBaseline":251.22,"fyForecast":13.32,"fyVariance":-95.0,"varianceNarrative":"The budget variance exceeds 5%. The annual total budget variance exceeds 5%. This is primarily due to the initial agreed CDEL baseline in this report for FY22 /23 being 236m, where the budget allocated was actually 80m. The CDEL and RDEL budgets were underspent due to Wave 2 competition outcomes being known too late to enable maximum delivery in the financial year 22/23.","wholeLifeCost":4721.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 remained at 4721m. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 remained at 4721m. This is primarily due to the following factors. Whole Life Costs remain unchanged for the programme from FY 21/22.","benefits":10326.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 10326m. The Demonstrator project learnings have been shared across the wider SHDF programme, resulting in the active consideration and application of lessons learned with a focus on deriving greater benefits in the delivery of future Waves of the SHDF programme.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. There has been considerable progress on the SHDF Programme over 22/23. The Programme is well placed to deliver whilst recognising risks on mobilisation, cost and…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2030-03-31. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2030-03-31. This is primarily due to the following factors. The SHDF programme continues to deliver and, subject to funding being allocated at a future fiscal event, it is expected to continue to deliver to the Programme end date in 2030. The Demonstrator is formally closing as a project, Wave 1 delivery continues as planned with delivery expected to be completed in 2023 and Wave 2 delivery commences at the start of financial year 23/24 for delivery through to 2025.","narrativeClaimKind":null},{"id":"BEIS_0014_2021-Q4","year":2024,"name":"Social Housing Decarbonisation Fund","department":"DESNZ","category":"Infrastructure and Construction","description":"The programme originates from a 3.8 bn pledge in the 2019 Manifesto to help decarbonise social housing in England over the period to 2030. SHDF intends to raise up to 900 k of the circa 1.4 m social homes below EPC band C to that level of energy efficiency, as a positive step on the pathway to the achievement of Net Zero for all 4 m social homes by 2050. The Programme is to be delivered over a series of Waves, providing the necessary flexibility of scheme design and delivery method over a decade of unpredictable policy and regulation. A 60 m Demonstrator Project has been delivered over FYs 21/22 and 22/23, with the 179m Wave 1 being delivered over FY22/23 and into 23/24. Following the SR21 settlement, a further 800m up to FY 24/25 has been secured for Wave 2, with future Waves subject to funding being allocated in future fiscal events. On Wave 2, 778m of funding was announced on 22/03/23 to fund 107 projects under 'Wave 2.1', with a further 1.1bn committed as match funding. Wave 2.2 was announced in October 2023, with successful projects awarded funding in March 2024.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The SHDF Programme is progressing well with projects at different points of the project life cycle. As at end of March 2024, SHDF Wave 1 is on course to conclude all closure activity during Q1 of 24/25, and is anticipated to achieve all of its benefits, including carbon reduction and treating a significant number of homes, thus contributing to the goal of reducing fuel poverty. The final evaluation of Wave 1's impact is due in Autumn 2025. Wave 2.1 has seen an increase in measures installed in households, however there is still work to do to ensure delivery reaches the necessary trajectory in year 2 of delivery to achieve scheme benefits. Successful applicants to SHDF Wave 2.2 were announced in March 2024, with grant funding payments due to commence in Q1 of 24/25. A GIAA Audit of the Programme's Lessons Learned approach took place in Q4 and returned a good or 'substantive' marking, demonstrating the success of the programme to date in learning and implementing lessons. SHDF Wave 3 is anticipated to progress to final approvals to commence delivery in 24/25, and received an Amber rating in March 2024 from an IPA Gateway 2 review.","startDate":"2020-09-09","endDate":"2030-03-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2030-03-31. This is primarily due to the following factors. Significant progress on the SHDF Programme included commencing project closure for Wave 1, delivery of Wave 2.1 and successful applicants into Wave 2.2. SHDF Is reasonably placed to deliver despite resourcing challenges. Wave 1 formally closed on 31 December 2023, with grant recipients closing projects through Jan-March 2024. By January 2024, there were c.27,000 measures installed in c.14,100 households under Wave 1. Wave 2.1, are working with finance and HMT to ensure accuracy on grant spend accounts. c.4,500 measures installed in c.2,500 households by January 2024. Following closure of the Wave 2.2 competition, 42 successful projects were announced, totalling 75.5m in grant funding. Wave 3 funding for 2025-28 was announced on 18 December 2023. Salix manage the Delivery Partner to enable delivery across Wave 2 and procurement of a delivery partner to support Wave 3. The Technical Assistance Facility contract was awarded to Turner and Townsend, signed in February 2024.","fyBaseline":320.04,"fyForecast":270.66,"fyVariance":-15.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. Known underspends and clawbacks from projects have contributed to the variance - however end of year finance reconcilliation activity will not conclude until May - so figures included in the cost will be amended in May 2024 and should not be used until DESNZ has confirmed a final figure for public use. The commencement of SHDF Wave 2.1 has seen a signficiant scale up in delivery and changes to our approach to accounting - lessons will be taken forward to ensure accurate financial reporting. _x000D_ DN: DESNZ have advised of issue with OSCAR Portal meaning incorrect costs will be recorded on the system","wholeLifeCost":4558.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 decreased from 4721m. to 4558m. This is primarily due to the following factors. Whole Life Costs for SHDF have been updated to account for the addition of SHDF Wave 2.2 (4558.82)","benefits":9619.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 2324-Q4 decreased from 10326m. to 9619m. This benefit is estimated using the same methodology as in tab 10. The baseline monetised benefits have increased since the last GMPP return due to GDP deflator updates and the inclusion of the DESNZ PIC-approved Wave 2.2 FBC impacts. Once Wave 1 closure activities have completed, the final benefits position, and lessons learned throughout delivery will be disseminated across the programme.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The SHDF Programme is progressing well with projects at different points of the project life cycle. As at end of March 2024, SHDF Wave 1 is on course to conclude all…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2030-03-31. This is primarily due to the following factors. Significant progress on the SHDF Programme included commencing project closure for Wave 1, delivery of Wave 2.1 and successful applicants into Wave 2.2. SHDF Is reasonably placed to deliver despite resourcing challenges. Wave 1 formally closed on 31 December 2023, with grant recipients closing projects through Jan-March 2024. By January 2024, there were c.27,000 measures installed in c.14,100 households under Wave 1. Wave 2.1, are working with finance and HMT to ensure accuracy on grant spend accounts. c.4,500 measures installed in c.2,500 households by January 2024. Following closure of the Wave 2.2 competition, 42 successful projects were announced, totalling 75.5m in grant funding. Wave 3 funding for 2025-28 was announced on 18 December 2023. Salix manage the Delivery Partner to enable delivery across Wave 2 and procurement of a delivery partner to support Wave 3. The Technical Assistance Facility contract was awarded to Turner and Townsend, signed in February 2024.","narrativeClaimKind":null},{"id":"BEIS_0014_2021-Q4","year":2025,"name":"SOCIAL HOUSING DECARBONISATION FUND","department":"DESNZ","category":"Infrastructure and Construction","description":"The SHDF capital programme (with new projects delivering as the Warm Homes: Social Housing Fund after April 2025) is designed to improve the energy performance of social housing through targeted investment and collaborative engagement with social housing landlords, funding the installation of energy efficiency measures and low-carbon technologies in social homes. SHDF began delivery in 2021 through the SHDF Demonstrator, and the latest project, Wave 3, will begin in Spring 2025. SHDF is a key pillar of the Government's Clean Energy Mission, by reducing carbon emissions produced by social homes. SHDF has the following specific aims: • Improve Energy Efficiency: Upgrade social homes to at least the EPC C standard. • Reduce Carbon Emissions: Contribute to the UK’s Net Zero targets by decarbonising housing • Tackle Fuel Poverty: Lower energy bills for tenants • Support Green Jobs: Stimulate employment in the retrofit and construction sectors. • Enhance Tenant Well-being: Improve comfort, health, and quality of life for residents. • Build Sector Capability: Develop skills, supply chains, and capacity for future retrofit projects","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Good progress has continued across the SHDF programme with SHDF Wave 2 in delivery and WH:SHF Wave 3 funding allocations announced in March 2025 for delivery through to 2028. Delivery confidence remains amber due to the programme’s high complexity and its dependency on a number of external factors.","startDate":"2020-09-09","endDate":"2028-10-01","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2030. This is primarily due to the following factors‚ The last programme business case from 2022 assumed delivery through to 2030. Data in this return has been amended to include business case information only to the end of Wave 3 delivery in 2028, as funded from the first phase of the 2025 spending review in Autumn 2024. Delivery beyond 2028 is subject to further spending review decisions.","fyBaseline":515.96,"fyForecast":472.4,"fyVariance":8.44,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The programme has demonstrated strong financial performance in 24/25, with over 90% of the allocated capital funding forecast to have been spent in 2024/25, representing an estimated £453m against an allocation of £495.5m. While there has been a slight variance in capital expenditure against the forecast, this reflects adjustments made during delivery, as some projects have amended project plans and altered their scope. In addition, SHDF is forecast to have spent 95% of its allocated RDEL budget. These numbers are provisional as at May 2025 and have been provided prior to final audit and review and may be subject to further revisions.","wholeLifeCost":2206.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 4558 to 2226. This is primarily due to the following factors‚ The last programme business case from 2022 assumed delivery through to 2030. Data in this return has been amended to include business case information only to the end of Wave 3 delivery in 2028, as funded from the first phase of the 2025 spending review in Autumn 2024. Delivery beyond 2028 is subject to further spending review decisions.","benefits":5737.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) decreased from 9619 to 5737. This is primarily due to the following factors‚ The Programme has recalibrated its benefit estimates in accordance with the latest approved project business case, which is for WH:SHF Wave 3, approved in Q4 of 24/25. This supersedes previous programme business cases which provided an estimate extending beyond this time period. Benefits will be revised should further funding be confirmed in future fiscal events.","themes":["Delivery & schedule","Cost & funding","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Good progress has continued across the SHDF programme with SHDF Wave 2 in delivery and WH:SHF Wave 3 funding allocations announced in March 2025 for delivery through…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":true,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2030. This is primarily due to the following factors‚ The last programme business case from 2022 assumed delivery through to 2030. Data in this return has been amended to include business case information only to the end of Wave 3 delivery in 2028, as funded from the first phase of the 2025 spending review in Autumn 2024. Delivery beyond 2028 is subject to further spending review decisions.","narrativeClaimKind":"date-mismatch"},{"id":"BEIS_0014_2021-Q4","year":2026,"name":"SOCIAL HOUSING DECARBONISATION FUND","department":"DESNZ","category":"Infrastructure and Construction","description":"The SHDF capital programme, which includes new projects delivering as the Warm Homes: Social Housing Fund since April 2025, is designed to improve the energy performance of social housing through targeted investment and collaborative engagement with social housing landlords, funding the installation of energy efficiency measures and low-carbon technologies in social homes. SHDF began delivery in 2021 through the SHDF Demonstrator, and the latest project, WH:SHF Wave 3, begun in Spring 2025.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 remains at Amber. This reflects sustained delivery progress across the programme, effective management of previously identified risks, and increased confidence in the programme’s ability to deliver its objectives within agreed parameters. In particular, the programme successfully launched a new scheme (Wave 3) and is forecasting to have delivered nearly all of its capital budget for 25/26. The overall programme reached a notable milestone, with the 100,000th energy efficiency measure installed during 25/26, demonstrating the scale and impact of the scheme to date. Wave 2 concluded delivery on the majority of projects, with residual activity focused on formal closure, reconciliation, and assurance processes agreed for the first quarter of 26/27. The Wave 2 project is on track to meet FBC targets. Wave 3 entered active delivery with all Grant Funding Agreements in place and projects progressing through delivery phases as planned. Delivery momentum strengthened during the year, evidenced by increased grant drawdowns and phase requests, demonstrating that projects are mobilised and delivering at scale. As at end of March, the delivery team are confident that close to the capital budget was successfully spent by grant recipients. Programme governance and controls continued to mature over the reporting period, with progress made in addressing assurance recommendations, improving data quality and reporting, and embedding lessons learned from earlier waves. The programme received a joint Amber at Gateway 3 assurance in Q4. Overall, the Green DCA rating for 25/26 reflects the demonstrable delivery progress on both outcomes and financial outturn. Sustaining this delivery confidence will only be possible if the programme receives strong support for resourcing needs, with proactive support as part of wider departmental transformation taking place in Q1/Q2.","startDate":"2020-09-09","endDate":"2030-03-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same.","fyBaseline":332.82,"fyForecast":332.43,"fyVariance":0.12,"varianceNarrative":"The budget variance is less than 5%, due to tight forecasting controls","wholeLifeCost":2256.29,"costNarrative":"Baseline WLC remain unchanged as per the latest agreed business case.","benefits":5582.9,"benefitsNarrative":"The project's departmentally agreed Benefits for 25/26-Q4 have not changed.","themes":["Delivery & schedule","Cost & funding","Governance & assurance","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 24/25, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 remains at Amber. This reflects sustained delivery progress across the programme, effective management of previously identified risks, and increased confidence in the programme’s ability to deliver its objectives within agreed parameters. In particular, the…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":true,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same.","narrativeClaimKind":"says-unchanged"}],"previous":{"id":"BEIS_0014_2021-Q4","year":2025,"name":"SOCIAL HOUSING DECARBONISATION FUND","department":"DESNZ","category":"Infrastructure and Construction","description":"The SHDF capital programme (with new projects delivering as the Warm Homes: Social Housing Fund after April 2025) is designed to improve the energy performance of social housing through targeted investment and collaborative engagement with social housing landlords, funding the installation of energy efficiency measures and low-carbon technologies in social homes. SHDF began delivery in 2021 through the SHDF Demonstrator, and the latest project, Wave 3, will begin in Spring 2025. SHDF is a key pillar of the Government's Clean Energy Mission, by reducing carbon emissions produced by social homes. SHDF has the following specific aims: • Improve Energy Efficiency: Upgrade social homes to at least the EPC C standard. • Reduce Carbon Emissions: Contribute to the UK’s Net Zero targets by decarbonising housing • Tackle Fuel Poverty: Lower energy bills for tenants • Support Green Jobs: Stimulate employment in the retrofit and construction sectors. • Enhance Tenant Well-being: Improve comfort, health, and quality of life for residents. • Build Sector Capability: Develop skills, supply chains, and capacity for future retrofit projects","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Good progress has continued across the SHDF programme with SHDF Wave 2 in delivery and WH:SHF Wave 3 funding allocations announced in March 2025 for delivery through to 2028. Delivery confidence remains amber due to the programme’s high complexity and its dependency on a number of external factors.","startDate":"2020-09-09","endDate":"2028-10-01","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2030. This is primarily due to the following factors‚ The last programme business case from 2022 assumed delivery through to 2030. Data in this return has been amended to include business case information only to the end of Wave 3 delivery in 2028, as funded from the first phase of the 2025 spending review in Autumn 2024. Delivery beyond 2028 is subject to further spending review decisions.","fyBaseline":515.96,"fyForecast":472.4,"fyVariance":8.44,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The programme has demonstrated strong financial performance in 24/25, with over 90% of the allocated capital funding forecast to have been spent in 2024/25, representing an estimated £453m against an allocation of £495.5m. While there has been a slight variance in capital expenditure against the forecast, this reflects adjustments made during delivery, as some projects have amended project plans and altered their scope. In addition, SHDF is forecast to have spent 95% of its allocated RDEL budget. These numbers are provisional as at May 2025 and have been provided prior to final audit and review and may be subject to further revisions.","wholeLifeCost":2206.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 4558 to 2226. This is primarily due to the following factors‚ The last programme business case from 2022 assumed delivery through to 2030. Data in this return has been amended to include business case information only to the end of Wave 3 delivery in 2028, as funded from the first phase of the 2025 spending review in Autumn 2024. Delivery beyond 2028 is subject to further spending review decisions.","benefits":5737.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) decreased from 9619 to 5737. This is primarily due to the following factors‚ The Programme has recalibrated its benefit estimates in accordance with the latest approved project business case, which is for WH:SHF Wave 3, approved in Q4 of 24/25. This supersedes previous programme business cases which provided an estimate extending beyond this time period. Benefits will be revised should further funding be confirmed in future fiscal events.","themes":["Delivery & schedule","Cost & funding","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Good progress has continued across the SHDF programme with SHDF Wave 2 in delivery and WH:SHF Wave 3 funding allocations announced in March 2025 for delivery through…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":true,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2030. This is primarily due to the following factors‚ The last programme business case from 2022 assumed delivery through to 2030. Data in this return has been amended to include business case information only to the end of Wave 3 delivery in 2028, as funded from the first phase of the 2025 spending review in Autumn 2024. Delivery beyond 2028 is subject to further spending review decisions.","narrativeClaimKind":"date-mismatch"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":546,"attentionScore":50,"attentionReasons":["Published commentary says the end date is unchanged while the published date moved","Current published delivery confidence is Amber","Published end date moved 546 days later"]},{"id":"MHCLG_0005_2021-Q4","year":2026,"name":"UK HOLOCAUST MEMORIAL AND LEARNING CENTRE","department":"MHCLG","category":"Infrastructure and Construction","description":"To build a striking new memorial to the Holocaust in Victoria Tower Gardens in Westminster to honour the six million Jewish men, women and children that were murdered during the Holocaust, as well as other victims of Nazi persecution. A Learning Centre will be located with the memorial to explore the British relationship to the Holocaust including the role of the British Parliament and democratic institutions.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at RED. The nominated Minister will need to retake the planning decision before the Programme can proceed to construction.","startDate":"2015-01-27","endDate":null,"scheduleNarrative":"Exempt under Section 35 - Formulation of government policy","fyBaseline":5.13,"fyForecast":2.3,"fyVariance":55.21,"varianceNarrative":"The budget variance exceeds 5% due to programme slippage. The key reason for delay is that the UK Holocaust Memorial & Learning Centre Programme is awaiting a decision on its planning application, which is required before construction can proceed.","wholeLifeCost":141.87,"costNarrative":"The WLC has increased by £4m primarily due to a longer programme, and unforeseen design costs and adjustments for inflation in real terms.","benefits":null,"benefitsNarrative":"The project does not focus on monetised benefits. Non-monetised benefits include the UK having a national Memorial to the Holocaust where people can pay their respects and reflect on the impact and enormity of the Holocaust. The Learning Centre will allow visitors to understand the importance of the Holocaust in British history, with increased awareness of subsequent genocides and antisemitism.","themes":["Approvals & decisions","Delivery & schedule","Commercial & supply chain","Cost & funding"],"evidenceExcerpt":"The SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at RED. The nominated Minister will need to retake the planning decision before the Programme can proceed to construction. Exempt under Section 35 - Formulation of government policy","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 35 - Formulation of government policy","narrativeClaimKind":null,"history":[{"id":"MHCLG_0005_2021-Q4","year":2021,"name":"UK Holocaust Memorial & Learning Centre Programme","department":"MHCLG","category":"Infrastructure and Construction","description":"To build a striking new memorial to the Holocaust in Victoria Tower Gardens in Westminster to honour the six million Jewish men, women and children that were murdered during the Holocaust, as well as other victims of Nazi persecution. A Learning Centre to be located with the memorial to explore the British relationship to the Holocaust including the role of the British Parliament, other institutions and wider society.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 35 of the Freedom of Information Act 2000 (formulation of government policy)","startDate":"2015-01-27","endDate":null,"scheduleNarrative":"Exempt under Section 35 of the Freedom of Information Act 2000 (formulation of government policy)","fyBaseline":9.46,"fyForecast":3.6,"fyVariance":null,"varianceNarrative":"Exempt under Section 35 of the Freedom of Information Act 2000 (formulation of government policy)","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"","themes":["Commercial & supply chain"],"evidenceExcerpt":"Exempt under Section 35 of the Freedom of Information Act 2000 (formulation of government policy) Exempt under Section 35 of the Freedom of Information Act 2000 (formulation of government policy)","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 35 of the Freedom of Information Act 2000 (formulation of government policy)","narrativeClaimKind":null},{"id":"MHCLG_0005_2021-Q4","year":2022,"name":"UK Holocaust Memorial and Learning Centre","department":"DLUHC","category":"Infrastructure and Construction","description":"The programme aims to build a striking new memorial to the Holocaust in Victoria Tower Gardens in Westminster to honour the six million Jewish men, women and children who were murdered during the Holocaust, as well as other victims of Nazi persecution. A Learning Centre will be located with the memorial to explore the British relationship to the Holocaust, including the role of the British Parliament and democratic institutions.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 2020/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating for at 21/22-Q4 was Red. A Statutory Review hearing was held in February 2022 on the planning consent awarded in July 2021. The High Court Judgment quashed the planning consent. The Department has sought leave to appeal this decision. Prior to this the programme had been rated as Amber.","startDate":"2015-01-27","endDate":null,"scheduleNarrative":"A Statutory Review hearing was held on the February 2022 on the planning consent awarded in July 2021. The judgment quashed the planning consent. The Department has sought leave to appeal this decision. * Dates are exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","fyBaseline":10.54,"fyForecast":2.44,"fyVariance":-77.0,"varianceNarrative":"The budget variance exceeds 5%. The delay caused by the legal processes has resulted in less expenditure than originally planned.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"","themes":["Approvals & decisions","Commercial & supply chain","Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 2020/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating for at 21/22-Q4 was Red. A Statutory Review hearing was held in February 2022 on the planning consent awarded in July 2021. The High Court Judgment quashed the planning consent. The Department has sought leave to appeal this decision. Prior to…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"A Statutory Review hearing was held on the February 2022 on the planning consent awarded in July 2021. The judgment quashed the planning consent. The Department has sought leave to appeal this decision. * Dates are exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","narrativeClaimKind":null},{"id":"MHCLG_0005_2021-Q4","year":2023,"name":"UK Holocaust Memorial and Learning Centre","department":"DLUHC","category":"Infrastructure and Construction","description":"The programme aims to build a striking new memorial to the Holocaust in Victoria Tower Gardens in Westminster to honour the six million Jewish men, women and children that were murdered during the Holocaust, as well as other victims of Nazi persecution. A Learning Centre will be located with the memorial to explore the British relationship to the Holocaust including the role of the British Parliament and democratic institutions.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 remained at Red (SRO rating). This is primarily due to the following factors. The Holocaust Memorial Bill was introduced on the 23 February 2023 to remove the statutory obstacle to planning and is proceeding through Parliament. The nominated Minister will need to retake the planning decision. The DLUHC Permanent Secretary wrote to the Secretary of State, who in return issued a ministerial direction that instructs the Permanent Secretary to continue to authorise expenditure as required on the Holocaust Memorial and Learning Centre programme, ahead of Royal Assent for the Holocaust Memorial Bill and the activation of the spending power contained within it. A revised Full Business Case went back to the DLUHC Investment Sub-Committee requesting an increased budget and contingency due to delays and construction inflation. The Accounting Officer (AO) assessment was published in August 2022, and a revised version is due to be published in 2023.","startDate":"2015-01-27","endDate":null,"scheduleNarrative":"The programme schedule has slipped due to the continuing planning process. We need the UK Holocaust Memorial Bill to receive Royal Assent and the nominated Minister to retake the planning decision, to allow the programme schedule to be defined. Once we are in a position to award construction contracts, we will work with the selected suppliers to identify any opportunities to reduce the construction timetable.","fyBaseline":23.1,"fyForecast":2.24,"fyVariance":-90.0,"varianceNarrative":"The budget variance exceeds 5%. The underspend is a result of the programme being unable to move into the construction phase as planned, due to the overturning of the planning decision in April 2022, with costs being pushed into future years as a result.","wholeLifeCost":124.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 22/23-Q4 is 124m. This is primarily due to the following factors. The Baseline costs remain unchanged and are based on the Full Business Case (FBC). The baseline will be reset upon approval of the revised FBC which anticipates increased costs primarily due to programme delays and inflation.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. The project did not provide departmental-agree monetised benefits at 22/23-Q4. The programme does not have any monetised benefits. Non-monetised benefits will be that the UK has a suitable national Memorial to the Holocaust, a place where people can pay their respects, contemplate, think and offer prayers, which conveys the enormity of the Holocaust and its impact, and which appropriately represents the fate of other victims of Nazi persecution. The Learning Centre will provide a memorable experience that will give visitors an increased understanding of the importance of the Holocaust in British history, increased awareness of subsequent genocides, and increased awareness of antisemitism.","themes":["Approvals & decisions","Cost & funding","Delivery & schedule","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 remained at Red (SRO rating). This is primarily due to the following factors. The Holocaust Memorial Bill was introduced on the 23 February 2023 to remove the statutory obstacle to planning and is proceeding through Parliament. The nominated Minister will need to…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The programme schedule has slipped due to the continuing planning process. We need the UK Holocaust Memorial Bill to receive Royal Assent and the nominated Minister to retake the planning decision, to allow the programme schedule to be defined. Once we are in a position to award construction contracts, we will work with the selected suppliers to identify any opportunities to reduce the construction timetable.","narrativeClaimKind":null},{"id":"MHCLG_0005_2021-Q4","year":2024,"name":"UK Holocaust Memorial and Learning Centre","department":"DLUHC","category":"Infrastructure and Construction","description":"The objective of the UK Holocaust Memorial and Learning Centre programme is to build a new memorial to the Holocaust in Victoria Tower Gardens in Westminster to honour the six million Jewish men, women and children that were murdered during the Holocaust. A learning centre will also be located with the memorial to explore the British relationship to the Holocaust, including the role of the British Parliament and democratic institutions.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Red. This is primarily due to the following factors. As at March 24: We continue to assess the delivery confidence of the programme as red. This is because the programme does not yet have planning consent. The Holocaust Memorial Bill was introduced in the House of Commons on the 23 February 2023 remove the obstacle to planning consent, and passed Second Reading unopposed in June 2023. When the Bill is passed, this status is expected to change.","startDate":"2015-01-27","endDate":"2029-01-31","scheduleNarrative":"The project's end-date at 23/24-Q4 is 2029-01-31. This is primarily due to the following factors. As at March 24: The project's end-date is January 2029.","fyBaseline":8.0,"fyForecast":1.45,"fyVariance":-82.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. Some costs have moved into future financial years.","wholeLifeCost":138.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 increased from 124m. to 138m. This is primarily due to the following factors. Whole Life Costs increased from 124m to 138m as agreed in a revised business case, due to programme delays and inflation.","benefits":0.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 0m. Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 0m.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Red. This is primarily due to the following factors. As at March 24: We continue to assess the delivery confidence of the programme as red. This is because the programme does not yet have planning consent. The Holocaust Memorial…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 23/24-Q4 is 2029-01-31. This is primarily due to the following factors. As at March 24: The project's end-date is January 2029.","narrativeClaimKind":null},{"id":"MHCLG_0005_2021-Q4","year":2025,"name":"UK HOLOCAUST MEMORIAL AND LEARNING CENTRE","department":"MHCLG","category":"Infrastructure and Construction","description":"To build a striking new memorial to the Holocaust in Victoria Tower Gardens in Westminster to honour the six million Jewish men, women and children that were murdered during the Holocaust, as well as other victims of Nazi persecution. A Learning Centre will be located with the memorial to explore the British relationship to the Holocaust including the role of the British Parliament and democratic institutions.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at RED. This is primarily due to the following factors‚ The Holocaust Memorial Bill is going through Parliament to remove the statutory obstacle to planning consent. After the Bill has received Royal Assent, the nominated Minister will need to retake the planning decision.","startDate":"2015-01-27","endDate":null,"scheduleNarrative":"Section 35 - Formulation of government policy","fyBaseline":3.37,"fyForecast":1.79,"fyVariance":46.88,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The passage of the Holocaust Memorial Bill took longer than expected, pushing back the estimated planning permission date and forecast spend on construction.","wholeLifeCost":142.88,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 138 to 142. This is primarily due to the following factors‚ Forecast costs increased due to delays to the programme, legal costs for the Holocaust Memorial Bill, provision for inflation and additional design costs.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ The project does not focus on monetised benefits. Non-monetised benefits include the UK having a national Memorial to the Holocaust where people can pay their respects and reflect on the impact and enormity of the Holocaust. The Learning Centre will allow visitors to understand the importance of the Holocaust in British history, with increased awareness of subsequent genocides and antisemitism.","themes":["Cost & funding","Approvals & decisions","Commercial & supply chain","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at RED. This is primarily due to the following factors‚ The Holocaust Memorial Bill is going through Parliament to remove the statutory obstacle to planning consent. After the Bill has received Royal Assent, the nominated…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Section 35 - Formulation of government policy","narrativeClaimKind":null},{"id":"MHCLG_0005_2021-Q4","year":2026,"name":"UK HOLOCAUST MEMORIAL AND LEARNING CENTRE","department":"MHCLG","category":"Infrastructure and Construction","description":"To build a striking new memorial to the Holocaust in Victoria Tower Gardens in Westminster to honour the six million Jewish men, women and children that were murdered during the Holocaust, as well as other victims of Nazi persecution. A Learning Centre will be located with the memorial to explore the British relationship to the Holocaust including the role of the British Parliament and democratic institutions.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at RED. The nominated Minister will need to retake the planning decision before the Programme can proceed to construction.","startDate":"2015-01-27","endDate":null,"scheduleNarrative":"Exempt under Section 35 - Formulation of government policy","fyBaseline":5.13,"fyForecast":2.3,"fyVariance":55.21,"varianceNarrative":"The budget variance exceeds 5% due to programme slippage. The key reason for delay is that the UK Holocaust Memorial & Learning Centre Programme is awaiting a decision on its planning application, which is required before construction can proceed.","wholeLifeCost":141.87,"costNarrative":"The WLC has increased by £4m primarily due to a longer programme, and unforeseen design costs and adjustments for inflation in real terms.","benefits":null,"benefitsNarrative":"The project does not focus on monetised benefits. Non-monetised benefits include the UK having a national Memorial to the Holocaust where people can pay their respects and reflect on the impact and enormity of the Holocaust. The Learning Centre will allow visitors to understand the importance of the Holocaust in British history, with increased awareness of subsequent genocides and antisemitism.","themes":["Approvals & decisions","Delivery & schedule","Commercial & supply chain","Cost & funding"],"evidenceExcerpt":"The SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at RED. The nominated Minister will need to retake the planning decision before the Programme can proceed to construction. Exempt under Section 35 - Formulation of government policy","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 35 - Formulation of government policy","narrativeClaimKind":null}],"previous":{"id":"MHCLG_0005_2021-Q4","year":2025,"name":"UK HOLOCAUST MEMORIAL AND LEARNING CENTRE","department":"MHCLG","category":"Infrastructure and Construction","description":"To build a striking new memorial to the Holocaust in Victoria Tower Gardens in Westminster to honour the six million Jewish men, women and children that were murdered during the Holocaust, as well as other victims of Nazi persecution. A Learning Centre will be located with the memorial to explore the British relationship to the Holocaust including the role of the British Parliament and democratic institutions.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at RED. This is primarily due to the following factors‚ The Holocaust Memorial Bill is going through Parliament to remove the statutory obstacle to planning consent. After the Bill has received Royal Assent, the nominated Minister will need to retake the planning decision.","startDate":"2015-01-27","endDate":null,"scheduleNarrative":"Section 35 - Formulation of government policy","fyBaseline":3.37,"fyForecast":1.79,"fyVariance":46.88,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The passage of the Holocaust Memorial Bill took longer than expected, pushing back the estimated planning permission date and forecast spend on construction.","wholeLifeCost":142.88,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 138 to 142. This is primarily due to the following factors‚ Forecast costs increased due to delays to the programme, legal costs for the Holocaust Memorial Bill, provision for inflation and additional design costs.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ The project does not focus on monetised benefits. Non-monetised benefits include the UK having a national Memorial to the Holocaust where people can pay their respects and reflect on the impact and enormity of the Holocaust. The Learning Centre will allow visitors to understand the importance of the Holocaust in British history, with increased awareness of subsequent genocides and antisemitism.","themes":["Cost & funding","Approvals & decisions","Commercial & supply chain","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at RED. This is primarily due to the following factors‚ The Holocaust Memorial Bill is going through Parliament to remove the statutory obstacle to planning consent. After the Bill has received Royal Assent, the nominated…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Section 35 - Formulation of government policy","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":null,"attentionScore":50,"attentionReasons":["Current published delivery confidence is Red","In-year forecast variance is +55.2%"]},{"id":"MOD_0124_2021-Q4","year":2026,"name":"MINE HUNTING CAPABILITY","department":"MOD","category":"Military Capability","description":"Mine Hunting Capability (MHC) will provide an agile, interoperable, and survivable capability using emerging Maritime Autonomous Systems (MAS) that enables strategic, operational, and tactical freedom of manoeuvre and exploitation of the battle space in order to assure and sustain the delivery of Maritime Force Projection and Maritime Security capabilities at the time and place of the UK’s choosing across the range of Standing Commitments and Operations, by defeating static underwater threats. The aim of MHC is to deliver a managed transition from current Mine Counter Measures Vessels (MCMV) to future MAS capabilities whilst sustaining and, where possible, improving capability delivery to provide military effect in accordance with extant Policy assumptions. The pace and nature of change is dictated by out-of-service dates for current MCMVs, by affordability issues, and by recognised capability shortfalls measured against an evolving requirement and threat. The intention is to transform current Mine Counter Measures thinking in order to enable these capabilities to be deployed differently, and more economically and effectively.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Exempt under Section 27 - International relations","startDate":"2014-10-01","endDate":"2034-03-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 31/03/2034.","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Compared to financial year 2024/25-Q4, the project's departmental-agreed monetised benefits at 2025/26-Q4 remained at £0m.","themes":["Commercial & supply chain","Cost & funding"],"evidenceExcerpt":"Exempt under Section 27 - International relations Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 31/03/2034.","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 31/03/2034.","narrativeClaimKind":null,"history":[{"id":"MOD_0124_2021-Q4","year":2021,"name":"Mine Hunting Capability","department":"MOD","category":"Military Capability","description":"The Mine Hunting Capability Programme will�provide an agile, interoperable and survivable capability using emerging Maritime Autonomous Systems that enables strategic, operational and tactical freedom of manoeuvre and exploitation of the battle space in order to assure and sustain the delivery of Maritime Force Projection and Maritime Security capabilities at the time and place of the United Kingdom's choosing across the range of Standing Commitments and Operations, by: Defeating static underwater threats; Collecting, processing and disseminating oceanographic intelligence.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber/red.This is primarily due to the following factors: Following approval of the Outline Business Case in Q4 2020, the main contracts were placed for Block 1 Mission Systems. These are due to reach initial operating capability in 2024 and are on track to do so. At the end of 2020, the Senior Responsible Owner-ship of Mine Countermeasure and Hydrographic Craft Capability was transferred to the new Navy Acquisition Directorate. The Senior Responsible Owner is being supported on a \"best efforts\" basis by the Navy Equipment and Systems Portfolio Management Office organisation pending approval to recruit a Programme Management Team to support this programme. The risk to programme delivery has thus increased owing to limitations in the capacity to mature programme controls and governance.","startDate":"2014-10-01","endDate":"2030-06-30","scheduleNarrative":"The project end-date is 30 June 2030. This is primarily due to the following factors: The schedule is broadly on track. There are some risks around industry delivery dates which are being closely managed by the team and the impacts can currently be managed within the schedule.","fyBaseline":20.37,"fyForecast":19.2,"fyVariance":-6.0,"varianceNarrative":"The budget variance exceeds 5%. Some modest investment has been made to initiate this programme, the business cases that will set out the required level of investment and budgetary requirements are being developed at pace. This will be disclosed to a public audience if it is appropriate to do so while respecting any commercial or security sensitivities.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"","themes":["Delivery & schedule","Workforce & capability","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber/red.This is primarily due to the following factors: Following approval of the Outline Business Case in Q4 2020, the main contracts were placed for Block 1 Mission Systems. These are due to reach initial operating capability in 2024 and are on track to do so. At the end of…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project end-date is 30 June 2030. This is primarily due to the following factors: The schedule is broadly on track. There are some risks around industry delivery dates which are being closely managed by the team and the impacts can currently be managed within the schedule.","narrativeClaimKind":null},{"id":"MOD_0124_2021-Q4","year":2022,"name":"Mine Hunting Capability","department":"MOD","category":"Military Capability","description":"The mine hunting Capability Programme will provide an agile, interoperable and survivable capability using emerging Maritime Autonomous Systems that enables strategic, operational and tactical freedom of manouvre and exploitation of the battle space in order to assure and sustain the delivery of Maritime Force Projection and Maritime Security capabilities at the time and place of the UK's choosing across the range of Standing Commitments and Operations, by defating static underwater threats.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating increased from Amber/Red to Amber. This is primarily due to the following factors: The removal of the incremental Amber/Green and Amber/Red assessment ratings. The procurement of an additional Uncrewed Surface Vessel, with Towed Side Scan Sonar and an associated Portable Operations Centre, will enable the deployment of an interim taskable capability to the Gulf Q1 23. This aligns with original timelines.","startDate":"2014-10-01","endDate":"2034-03-31","scheduleNarrative":"Compared to 2021-Q4, the project end-date increased from 30 June 30 to 31 March 34. This is primarily due to the following factors: The programmes end date has been updated to deliver the additional Mission System 6.","fyBaseline":89.6,"fyForecast":83.72,"fyVariance":-6.0,"varianceNarrative":"The budget variance exceeds 5%. This was due to a re-profile and slippage of some activities into the next Financial Year. However, there is an expectation for this variance to reduce and be lower than 5% at Q4 22-23. This reduction is dependent on third party accruals evidence being submitted on time by suppliers to support accruals.","wholeLifeCost":459.0,"costNarrative":"Compared to 2021-Q4, the projects baseline Whole Life Cost increased from 146.58(£m) to 458.65(£m). This is primarily due to the following factors: The management of Private Sector Support has been adjusted to maximise their value and contribution. This resulted in a slight variance of Control Total being removed which is currently being reconciled.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating increased from Amber/Red to Amber. This is primarily due to the following factors: The removal of the incremental Amber/Green and Amber/Red assessment ratings. The procurement of an additional Uncrewed Surface Vessel, with Towed Side Scan Sonar…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to 2021-Q4, the project end-date increased from 30 June 30 to 31 March 34. This is primarily due to the following factors: The programmes end date has been updated to deliver the additional Mission System 6.","narrativeClaimKind":null},{"id":"MOD_0124_2021-Q4","year":2023,"name":"Mine Hunting Capability","department":"MOD","category":"Military Capability","description":"","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. Resourcing challenges, predominantly with the infrastructure and logistics lines of development, and the impact of poor supplier performance on Block 1 in delivering Mission Systems for Operational Evaluation.","startDate":"2014-10-01","endDate":"2034-03-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2034-03-31. This is primarily due to the following factors. NA","fyBaseline":102.45,"fyForecast":102.44,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This programme does not report cashable benefits. Its aim is to provision the armed forces with the equipment and / or infrastructure required.","themes":["Commercial & supply chain","Cost & funding","Delivery & schedule","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. Resourcing challenges, predominantly with the infrastructure and logistics lines of development, and the impact of poor supplier performance on Block 1 in delivering…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2034-03-31. This is primarily due to the following factors. NA","narrativeClaimKind":null},{"id":"MOD_0124_2021-Q4","year":2024,"name":"Mine Hunting Capability","department":"MOD","category":"Military Capability","description":"The Mine Hunting Programme will provide an agile, interoperable, and survivable capability using emerging Maritime Autonomous Systems. This will enable strategic, operational and tactical freedom of manoeuvre and exploitation of the battle space, in order to assure and sustain the delivery of Maritime Force Projection and Maritime Security capabilities, at the time and place of the UK’s choosing across the range of Standing Commitments and Operations, by defeating static underwater threats. The aim is to deliver a managed transition from current Mine Counter Measures Vessels to future Maritime Autonomous Systems capabilities whilst sustaining and, where possible, improving capability delivery.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remains at Amber. This is primarily due to the following factors. Historical poor supplier performance on Block 1.","startDate":"2014-10-01","endDate":"2034-03-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the programme's end-date at 23/24-Q4 remains at 2034-03-31. This is primarily due to the following factors. Operational Evaluation Unit has deployed to the Gulf and Offshore Support Vessel has delivered to Devonport in accordance with the schedule. Despite challenges, Block 1 remains on scheduled to conclude within approval.","fyBaseline":44.3,"fyForecast":30.4,"fyVariance":-31.377,"varianceNarrative":"The budget variance exceeds 5% this is primarily due to the following factors. Contractor performance and reprioritisation on MHC Block 1, which has required some re-profiling after prioritisation of Autonomous Underwater Vehicle re-role activity. This has been reprofiled into future years as part of a Programme Cost Review.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.)","benefits":0.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 0m.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remains at Amber. This is primarily due to the following factors. Historical poor supplier performance on Block 1. Compared to financial year 22/23-Q4, the programme's end-date at 23/24-Q4 remains at 2034-03-31. This is primarily due to the…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 22/23-Q4, the programme's end-date at 23/24-Q4 remains at 2034-03-31. This is primarily due to the following factors. Operational Evaluation Unit has deployed to the Gulf and Offshore Support Vessel has delivered to Devonport in accordance with the schedule. Despite challenges, Block 1 remains on scheduled to conclude within approval.","narrativeClaimKind":null},{"id":"MOD_0124_2021-Q4","year":2025,"name":"MINE HUNTING CAPABILITY","department":"MoD","category":"Military Capability","description":"To provide an agile, interoperable, and survivable capability using emerging Maritime Autonomous Systems (MAS) that enables strategic, operational, and tactical freedom of manoeuvre and exploitation of the battle space in order to assure and sustain the delivery of Maritime Force Projection and Maritime Security capabilities at the time and place of the UK’s choosing across the range of Standing Commitments and Operations, by defeating static underwater threats. The aim of Mine Hunting Capability (MHC) is to deliver a managed transition from current Mine Counter Measures Vessels (MCMV) to future MAS capabilities whilst sustaining and, where possible, improving capability delivery to provide military effect in accordance with extant Policy assumptions. The pace and nature of change is dictated by out-of-service dates for current MCMVs, by affordability issues, and by recognised capability shortfalls measured against an evolving requirement and threat. The intention is to transform current Mine Counter Measures thinking in order to enable these capabilities to be deployed differently, and more economically and effectively. Key aims of the programme are to provide assured assure the safe operational deployment and return of the Continuous At Sea Deterrent and to deliver capability ‘in stride’ with a Maritime Task Group.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Section 27 - International relations","startDate":"2014-10-01","endDate":"2034-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2034.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 43 - Commercial interests","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Commercial & supply chain","Cost & funding"],"evidenceExcerpt":"Section 27 - International relations Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2034.","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2034.","narrativeClaimKind":null},{"id":"MOD_0124_2021-Q4","year":2026,"name":"MINE HUNTING CAPABILITY","department":"MOD","category":"Military Capability","description":"Mine Hunting Capability (MHC) will provide an agile, interoperable, and survivable capability using emerging Maritime Autonomous Systems (MAS) that enables strategic, operational, and tactical freedom of manoeuvre and exploitation of the battle space in order to assure and sustain the delivery of Maritime Force Projection and Maritime Security capabilities at the time and place of the UK’s choosing across the range of Standing Commitments and Operations, by defeating static underwater threats. The aim of MHC is to deliver a managed transition from current Mine Counter Measures Vessels (MCMV) to future MAS capabilities whilst sustaining and, where possible, improving capability delivery to provide military effect in accordance with extant Policy assumptions. The pace and nature of change is dictated by out-of-service dates for current MCMVs, by affordability issues, and by recognised capability shortfalls measured against an evolving requirement and threat. The intention is to transform current Mine Counter Measures thinking in order to enable these capabilities to be deployed differently, and more economically and effectively.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Exempt under Section 27 - International relations","startDate":"2014-10-01","endDate":"2034-03-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 31/03/2034.","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Compared to financial year 2024/25-Q4, the project's departmental-agreed monetised benefits at 2025/26-Q4 remained at £0m.","themes":["Commercial & supply chain","Cost & funding"],"evidenceExcerpt":"Exempt under Section 27 - International relations Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 31/03/2034.","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 31/03/2034.","narrativeClaimKind":null}],"previous":{"id":"MOD_0124_2021-Q4","year":2025,"name":"MINE HUNTING CAPABILITY","department":"MoD","category":"Military Capability","description":"To provide an agile, interoperable, and survivable capability using emerging Maritime Autonomous Systems (MAS) that enables strategic, operational, and tactical freedom of manoeuvre and exploitation of the battle space in order to assure and sustain the delivery of Maritime Force Projection and Maritime Security capabilities at the time and place of the UK’s choosing across the range of Standing Commitments and Operations, by defeating static underwater threats. The aim of Mine Hunting Capability (MHC) is to deliver a managed transition from current Mine Counter Measures Vessels (MCMV) to future MAS capabilities whilst sustaining and, where possible, improving capability delivery to provide military effect in accordance with extant Policy assumptions. The pace and nature of change is dictated by out-of-service dates for current MCMVs, by affordability issues, and by recognised capability shortfalls measured against an evolving requirement and threat. The intention is to transform current Mine Counter Measures thinking in order to enable these capabilities to be deployed differently, and more economically and effectively. Key aims of the programme are to provide assured assure the safe operational deployment and return of the Continuous At Sea Deterrent and to deliver capability ‘in stride’ with a Maritime Task Group.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Section 27 - International relations","startDate":"2014-10-01","endDate":"2034-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2034.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 43 - Commercial interests","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Commercial & supply chain","Cost & funding"],"evidenceExcerpt":"Section 27 - International relations Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2034.","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2034.","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":0,"attentionScore":49,"attentionReasons":["Current published delivery confidence is Red","In-year forecast variance is +43.0%"]},{"id":"HMT_0004_2021-Q2","year":2026,"name":"NS&I Transformation","department":"HMT","category":"Government Transformation and Service Delivery","description":"The Business Transformation Programme (BTP) exists to modernise NS&I’s technology, operating model and supplier arrangements so that the organisation can continue to deliver safe, secure and reliable savings products while providing long‑term value for money to the taxpayer. The programme is designed to replace ageing, expensive, inflexible legacy systems and move NS&I towards a more cost-effective, resilient, scalable and digital‑first service, enabling it to respond effectively to changing customer needs, Government policy requirements and market conditions. In doing so, the programme aims to: - Reduce the long‑term cost of running the business, including Business‑as‑Usual operations and future change delivery - Improve customer experience and accessibility, supporting digital self‑service while ensuring provision for vulnerable or excluded customers - Increase operational resilience and security, including improved cyber security and continuity of service through transition and beyond - Strengthen NS&I’s agility and change capability, allowing faster, lower‑risk delivery of new products and policy‑driven change for HM Treasury Overall, the Business Transformation Programme underpins NS&I’s ambition to become the UK’s most trusted savings provider, with a sustainable delivery model that supports public services over the long term and aligns with Government Major Projects Portfolio (GMPP) expectations for value, resilience and capability.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Delivery confidence is assessed as RED because the programme cannot currently be delivered to agreed cost, schedule and scope without significant re‑planning and re‑baselining. There is no agreed, affordable end‑to‑end delivery plan, with delivery outcomes dependent on the resolution of active options analysis and future funding decisions. Confidence is further constrained by Spending Review affordability pressures, ongoing uncertainty around scope and sequencing, and the absence of a finalised, quantified benefits baseline. Until these issues are resolved and a preferred option is approved, delivery commitments cannot be made with confidence. Senior‑level intervention and agreement with HM Treasury are required to restore a credible baseline and improve delivery confidence.","startDate":"2019-06-03","endDate":null,"scheduleNarrative":"Exempt under Section 43 - Commercial interests","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Exempt under Section 43 - Commercial interests","themes":["Delivery & schedule","Commercial & supply chain","Cost & funding","Scope & requirements"],"evidenceExcerpt":"Delivery confidence is assessed as RED because the programme cannot currently be delivered to agreed cost, schedule and scope without significant re‑planning and re‑baselining. There is no agreed, affordable end‑to‑end delivery plan, with delivery outcomes dependent on the resolution of active options analysis and future funding decisions. Confidence is…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 43 - Commercial interests","narrativeClaimKind":null,"history":[{"id":"HMT_0004_2021-Q2","year":2021,"name":"NS&I Rainbow","department":"HMT","category":"Government Transformation and Service Delivery","description":"The Programme has three key aims to; . Measurably reduce the costs of running the business; . Become a self-service digital business with support for the vulnerable and excluded; and . Deliver more nimbly, reduce risk and enhance scalability.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber.This is primarily due to the following factors: The SRO Delivery Confidence Assessment (DCA) rating at Q4 2021 (31st March 2021) was Amber, due primarily to the following factors; -The Programme has recently received approval to proceed into the Delivery Phase and is currently mobilising against a re-baselined Programme schedule. -The acquisition of key resources required to commence Programme and Project activities is underway and expect to increase.","startDate":"2019-06-03","endDate":"2024-07-31","scheduleNarrative":"The project end-date is 31 July 2024. This is primarily due to the following factors: The schedule baseline Programme end date at Q4 (31st March 2021) is 31 July 2024, has not changed since the Programme reported, due primarily to the following reasons; -The Programme has recently received approval to proceed into the Delivery Phase and has carried out a Programme schedule re-baselining exercise which concluded that there was no impact on the end Programme delivery date following changes to the approval date. Sub-Programme milestones were able to accommodate the delays as per the teams ability to maintain key deliverable activity outputs. -While the exercise was underway continued to work to deliver key Programme deliverables in line with the baseline plan with the available Programme resources.","fyBaseline":0.0,"fyForecast":0.0,"fyVariance":null,"varianceNarrative":"The GMPP project did not provide data","wholeLifeCost":1158.35,"costNarrative":"The projects Baseline Whole Life Cost is �1158.35m. This is primarily due to the following factors: The baseline Whole Life Cost at Q4 2021 (31st March) is �1158.35m. The baseline Whole Life Costs covers the period up to 2031.","benefits":null,"benefitsNarrative":"","themes":["Delivery & schedule","Cost & funding","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber.This is primarily due to the following factors: The SRO Delivery Confidence Assessment (DCA) rating at Q4 2021 (31st March 2021) was Amber, due primarily to the following factors; -The Programme has recently received approval to proceed into the Delivery Phase and is…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project end-date is 31 July 2024. This is primarily due to the following factors: The schedule baseline Programme end date at Q4 (31st March 2021) is 31 July 2024, has not changed since the Programme reported, due primarily to the following reasons; -The Programme has recently received approval to proceed into the Delivery Phase and has carried out a Programme schedule re-baselining exercise which concluded that there was no impact on the end Programme delivery date following changes to the approval date. Sub-Programme milestones were able to accommodate the delays as per the teams ability to maintain key deliverable activity outputs. -While the exercise was underway continued to work to deliver key Programme deliverables in line with the baseline plan with the available Programme resources.","narrativeClaimKind":null},{"id":"HMT_0004_2021-Q2","year":2022,"name":"NS&I Rainbow","department":"HMT","category":"Government Transformation and Service Delivery","description":"The Programmes has three key aims to; 1) Deliver a measurable reduction to the cost of running and changing the business, 2) Become a self-service digital business with support for the vulnerable and excluded, 3) Deliver more nimbly, reduce risks and enhance scalability.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 20/21-Q4, the Delivery Confidence Assessment rating at 21/22-Q4 remained at Amber We have successfully completed the procurement activity for procurement package A. We are currently in the procurement process on package B and we awaiting CDDO and CO approval to launch competitive dialogue for procurement C and D respectively. We have completed the addendum Outline Business Case refresh, which was presented to HMT on 17/03/2022. Resource increase is in the process of being prepared.","startDate":"2019-06-03","endDate":"2024-07-31","scheduleNarrative":"Compared to 2021-Q4, your project end-date remained scheduled to finish on 31 JUL 2024 . This is primarily due to the following factors: No Changes to the Milestones have been made to this stage of the programme. The Preparation work currently underway for the business case refresh will assist with identifying any key changes to the Milestones and will align to intra Project Timescale changes.","fyBaseline":48.9,"fyForecast":10.57,"fyVariance":-78.0,"varianceNarrative":"During 2019-20 and 2020-21 NS&I created and assessed a long list of options for how to proceed after the existing outsourcing contract ended in March 2024. This essential discovery activity eventually led to the creation of a Strategic Outline Business Case and an Outline Business Case (OBC). The Programme's ability to spend in line with our allocation and earlier forecasting has been impacted by factors including delays in onboarding required programme resources impacting delivery to the original schedule, particularly for PPA and PPB meaning associated costs will be incurred FY 22/23 instead of FY 21/22; Atos' capacity to deliver against the Transformation Programme schedule and anticipated deliverables (Including Progressive Transformation Projects); Operational recovery delaying progression of planned legacy data work; PPA contract award being rescheduled to April 22 impacting originally forecast supplier costs.","wholeLifeCost":1158.0,"costNarrative":"Compared to 2021-Q4,the projects Baseline Whole Life Cost remained at 1158.35 (£m). This is primarily due to the following factors: Compared to 2021-Q4, the Baseline Whole Life Cost remained at 1158.35 (£m). The WLC covers ten years and is based on the assumptions within our latest approved Outline Business Case.","benefits":null,"benefitsNarrative":"","themes":["Commercial & supply chain","Approvals & decisions","Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Delivery Confidence Assessment rating at 21/22-Q4 remained at Amber We have successfully completed the procurement activity for procurement package A. We are currently in the procurement process on package B and we awaiting CDDO and CO approval to launch competitive dialogue for procurement C and D respectively. We…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to 2021-Q4, your project end-date remained scheduled to finish on 31 JUL 2024 . This is primarily due to the following factors: No Changes to the Milestones have been made to this stage of the programme. The Preparation work currently underway for the business case refresh will assist with identifying any key changes to the Milestones and will align to intra Project Timescale changes.","narrativeClaimKind":null},{"id":"HMT_0004_2021-Q2","year":2023,"name":"NS&I Rainbow","department":"HMT","category":"Government Transformation and Service Delivery","description":"The aims of the programme are to: 1. Measurably reduce the costs of running the business and growing revenue 2. Become a self-service digital business with support for the vulnerable and excluded 3. Deliver more nimbly, reduce risk and enhance scalability","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 decreased from Amber (SRO rating) to Red (IPA rating). This is primarily due to the following factors. Since the last update, we have been focussing on replanning to obtain a re-baselined plan while continuing to close out dialogue activities. The Programme is now reaching the conclusion of procurement activities (with PPB due to complete by late Summer 2023) and therefore we are preparing the activities required for the move into a delivery-focussed programme. Given this, we would expect the Delivery Confidence to start improving over the coming months as more elements of the plan start to crystalise. Funding will remain a key item, however. We have remained in close dialogue with DRM about the expected envelope and approvals timeline over the summer.","startDate":"2019-06-03","endDate":"2025-07-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 increased from 2024-07-31 to 2025-07-31. This is primarily due to the following factors. We have:-Successfully achieved operational readiness for Procurement Package A and delivery is in the final phase.Recently identified the optimum procurement route for package B and have replanned and rebase-lined the Programme accordingly. A 1 year continuance to the incumbent contract to cover the delays due to the failed PPB procurement has been approved by HMT.We are in the process of exiting Dialogue for packages C & D and will shortly be issuing invitations to submit final tenders.Identified the winning bidder for B2B package E and are in the process of consulting our clients.Appointed our delivery partners for Service Integration and Management (SIAM) and Technology Build.Work is now starting on preparing the Final Business Case and preparing for the IPA Gateway 3 in June.","fyBaseline":56.89,"fyForecast":35.75,"fyVariance":-37.0,"varianceNarrative":"The Programme's ability to spend in line with our allocations and earlier forecasting has been impacted by factors including delays in onboarding the required programme resource impacting delivery to the original schedule particular PPB meaning associated costs will be incurred in future years instead of FY 2022/2023","wholeLifeCost":1158.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 remained at 1158m. This is primarily due to the following factors. Since the 2021-22 Q4 submission, we have gained clarity on, and refined a number of the assumptions used in the financial model which has led to a revised whole life cost.Package A cost estimates are now based on the awarded IBM contract plus agreed change requests. The forecasts for the remaining three main procurement packages are based on initial bidder submissions with adjusted timings to reflect the current plan. The current plan assumes the existing provider, Atos, will provide termination assistance services during 2024-25. The greater certainty associated with the updated assumptions has enabled us to revise the optimism bias calculation. We also gained clarity on the VAT position following independent advice and made updates. In addition to these changes, we have updated inflation assumptions in line with latest ONS estimates.","benefits":590.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 590m. The project's departmental-agree monetised benefits at 22/23-Q4 is 590m.The project's departmental-agree monetised benefits at 22/23-Q4 is 590m.The project's departmental-agree monetised benefits at 22/23-Q4 is 590m. The Baseline Benefits are taken from the Outline Business Case. Benefits we noted at that time included:A reduction in FTE for delivery of the Customer Interaction Centre resulting from a move to more online self-service interactions.A reduction in FTE for back office operational processing as customers are able to complete more tasks online with fully automated processes.A reduction in print, paper and postage costs as customers move to paperless following online initiativesA reduction in debit card costs as customers move to more cost-efficient payment methodsA reduction in technology costs as we move to fully supported systems and less bespoke software.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Technical & integration"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 decreased from Amber (SRO rating) to Red (IPA rating). This is primarily due to the following factors. Since the last update, we have been focussing on replanning to obtain a re-baselined plan while continuing to close out dialogue activities. The Programme is now…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 increased from 2024-07-31 to 2025-07-31. This is primarily due to the following factors. We have:-Successfully achieved operational readiness for Procurement Package A and delivery is in the final phase.Recently identified the optimum procurement route for package B and have replanned and rebase-lined the Programme accordingly. A 1 year continuance to the incumbent contract to cover the delays due to the failed PPB procurement has been approved by HMT.We are in the process of exiting Dialogue for packages C & D and will shortly be issuing invitations to submit final tenders.Identified the winning bidder for B2B package E and are in the process of consulting our clients.Appointed our delivery partners for Service Integration and Management (SIAM) and Technology Build.Work is now starting on preparing the Final Business Case and preparing for the IPA Gateway 3 in June.","narrativeClaimKind":null},{"id":"HMT_0004_2021-Q2","year":2024,"name":"NS&I Rainbow","department":"HMT","category":"Government Transformation and Service Delivery","description":"\"The aims of the programme are to:_x000D_ 1. Measurably reduce the costs of running the business and growing revenue_x000D_ 2. Become a self-service digital business with support for the vulnerable and excluded_x000D_ 3. Deliver more nimbly, reduce risk and enhance scalability\"","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Red. This is primarily due to the following factors. Since the last annual update, the Programme has awarded further procurement packages and signed contracts for B2B Transition, Contact Centre and Operations (awarded to Sopra Steria Ltd.) and Digital Experience and Enablement (awarded to IBM). Delivery teams have mobilised to collaboratively develop detailed solution designs and plans for transitioning these services from NS&I's incumbent, Atos to NS&I's new strategic delivery partners. However, finalising end to end solution designs, agreeing detailed dependencies and finalising commercial agreements has been challenging and continues to prove so. Delays achieving alignment in these areas and in contract signature for NS&Is new Banking Engine have impacted transition delivery milestones. Atos' market position has deteriorated and continues to be monitored carefully. A recovery route on an Integrated Delivery approach and plan continues to be the Programme's focus, working collaboratively with all strategic partners and with technical, legal and commercial experts.","startDate":"2019-06-03","endDate":"2026-03-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 increased from 2025-07-31 to 2026-03-31. This is primarily due to the following factors. The Programme continues to work in collaboration with all NS&I's strategic partners and experts engaged in the programme to develop the technical and commercial solutions required to achieve transition of services and programme completion by current programme end-date. However, initial contract delivery milestones have not all been met owing to the complex challenges experienced in finalising detailed solution designs, plans and commercials, and the Programme does not yet have an integrated plan with dependencies agreed by all partners that demonstrates its ability to deliver by this end date. The concerted effort to achieve this is the programme's priority, in which key resources continue to be engaged.","fyBaseline":109.52,"fyForecast":89.68,"fyVariance":-18.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The GMPP project did not provide narrative","wholeLifeCost":1864.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 increased from 1158m. to 1864m. This is primarily due to the following factors. NS&I received approval for the Rainbow Programme Full Business Case (FBC) in September 2023. This follows approval of the Outline Business Case in March 2021, and approval of the Strategic Outline Business Case in June 2020. The baseline costs in the GMPP quarterly submission reflect the financial analysis in the FBC which covers the period from 2021-22 through to 2030-31. Costs incurred prior to April 2021 were part of a discovery exercise and were not specifically attributed to this project. The costs shown here cover activities including running the procurements, building the solutions, transforming the business, and the future ongoing running costs.","benefits":488.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 2324-Q4 decreased from 590m. to 488m. Full monetised benefits are only forecast to start from 2026-27 after the organisational transformation has completed.","themes":["Commercial & supply chain","Cost & funding","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Red. This is primarily due to the following factors. Since the last annual update, the Programme has awarded further procurement packages and signed contracts for B2B Transition, Contact Centre and Operations (awarded to…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 increased from 2025-07-31 to 2026-03-31. This is primarily due to the following factors. The Programme continues to work in collaboration with all NS&I's strategic partners and experts engaged in the programme to develop the technical and commercial solutions required to achieve transition of services and programme completion by current programme end-date. However, initial contract delivery milestones have not all been met owing to the complex challenges experienced in finalising detailed solution designs, plans and commercials, and the Programme does not yet have an integrated plan with dependencies agreed by all partners that demonstrates its ability to deliver by this end date. The concerted effort to achieve this is the programme's priority, in which key resources continue to be engaged.","narrativeClaimKind":null},{"id":"HMT_0004_2021-Q2","year":2025,"name":"NS&I Transformation","department":"HMT","category":"Government Transformation and Service Delivery","description":"The NS&I Business Transformation Programme will undertake a re-procurement of services and implementation of a new business delivery model with three aims: • To measurably reduce the costs of running the Retail business in steady state, • To complete NS&I’s journey to becoming a self-service digital business with support for the vulnerable and excluded, • To deliver more nimbly, reducing risk and enhancing scalability.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at RED. This is primarily due to the following factors‚ Solution gaps and other serious risks to the Business Transformation Programme have necessitated a recovery plan. There is a risk of slippage on major roadmap deliverables caused by scope and timeline mismatches between supplier contracts and the programme roadmap, alongside solution and design gaps necessitating re-work. In January 2025 the IPA conducted an Assurance of Action Plan that rated the programme’s recovery plan as AMBER, giving confidence that once the recovery plan is executed, the programme will return to Amber status.","startDate":"2019-06-03","endDate":"2028-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2026 to 31/03/2028. This is primarily due to the following factors‚ Commercial issues persisted with delays to contract signature for NS&I’s core banking engine and with the delivery of NS&I’s new Business-to-Business capability. Their combined impact was to extend the outsourcing agreement with the existing supplier by 2 years to March 28. Programme recovery was also a factor, with the core element being a significant shift in delivery approach for the remaining milestones.","fyBaseline":342.8,"fyForecast":329.9,"fyVariance":3.76,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":2955.6,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased to 2955. This is primarily due to the following factors‚ The updated Full Business Case (FBC) was approved by Ministers and HM Treasury in Dec. 2024. This showed a cost increase over the previous 2023 Business Case in part due to inflation effects on rephased costs, increased solution complexity and increased incumbent and head office costs, as the transitional period for the programme was extended. Additional risk-based costs were also included to reflect solution uncertainty during the recovery period.","benefits":971.3,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 488 to 971. This is primarily due to the following factors‚ The updated Full Business Case (FBC) was approved by Ministers and HM Treasury at the end of 2024. This FBC is reporting benefits up to 2033-34, as compared to the previous FBC which reported benefits up to 2030-31.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at RED. This is primarily due to the following factors‚ Solution gaps and other serious risks to the Business Transformation Programme have necessitated a recovery plan. There is a risk of slippage on major roadmap…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2026 to 31/03/2028. This is primarily due to the following factors‚ Commercial issues persisted with delays to contract signature for NS&I’s core banking engine and with the delivery of NS&I’s new Business-to-Business capability. Their combined impact was to extend the outsourcing agreement with the existing supplier by 2 years to March 28. Programme recovery was also a factor, with the core element being a significant shift in delivery approach for the remaining milestones.","narrativeClaimKind":null},{"id":"HMT_0004_2021-Q2","year":2026,"name":"NS&I Transformation","department":"HMT","category":"Government Transformation and Service Delivery","description":"The Business Transformation Programme (BTP) exists to modernise NS&I’s technology, operating model and supplier arrangements so that the organisation can continue to deliver safe, secure and reliable savings products while providing long‑term value for money to the taxpayer. The programme is designed to replace ageing, expensive, inflexible legacy systems and move NS&I towards a more cost-effective, resilient, scalable and digital‑first service, enabling it to respond effectively to changing customer needs, Government policy requirements and market conditions. In doing so, the programme aims to: - Reduce the long‑term cost of running the business, including Business‑as‑Usual operations and future change delivery - Improve customer experience and accessibility, supporting digital self‑service while ensuring provision for vulnerable or excluded customers - Increase operational resilience and security, including improved cyber security and continuity of service through transition and beyond - Strengthen NS&I’s agility and change capability, allowing faster, lower‑risk delivery of new products and policy‑driven change for HM Treasury Overall, the Business Transformation Programme underpins NS&I’s ambition to become the UK’s most trusted savings provider, with a sustainable delivery model that supports public services over the long term and aligns with Government Major Projects Portfolio (GMPP) expectations for value, resilience and capability.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Delivery confidence is assessed as RED because the programme cannot currently be delivered to agreed cost, schedule and scope without significant re‑planning and re‑baselining. There is no agreed, affordable end‑to‑end delivery plan, with delivery outcomes dependent on the resolution of active options analysis and future funding decisions. Confidence is further constrained by Spending Review affordability pressures, ongoing uncertainty around scope and sequencing, and the absence of a finalised, quantified benefits baseline. Until these issues are resolved and a preferred option is approved, delivery commitments cannot be made with confidence. Senior‑level intervention and agreement with HM Treasury are required to restore a credible baseline and improve delivery confidence.","startDate":"2019-06-03","endDate":null,"scheduleNarrative":"Exempt under Section 43 - Commercial interests","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Exempt under Section 43 - Commercial interests","themes":["Delivery & schedule","Commercial & supply chain","Cost & funding","Scope & requirements"],"evidenceExcerpt":"Delivery confidence is assessed as RED because the programme cannot currently be delivered to agreed cost, schedule and scope without significant re‑planning and re‑baselining. There is no agreed, affordable end‑to‑end delivery plan, with delivery outcomes dependent on the resolution of active options analysis and future funding decisions. Confidence is…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 43 - Commercial interests","narrativeClaimKind":null}],"previous":{"id":"HMT_0004_2021-Q2","year":2025,"name":"NS&I Transformation","department":"HMT","category":"Government Transformation and Service Delivery","description":"The NS&I Business Transformation Programme will undertake a re-procurement of services and implementation of a new business delivery model with three aims: • To measurably reduce the costs of running the Retail business in steady state, • To complete NS&I’s journey to becoming a self-service digital business with support for the vulnerable and excluded, • To deliver more nimbly, reducing risk and enhancing scalability.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at RED. This is primarily due to the following factors‚ Solution gaps and other serious risks to the Business Transformation Programme have necessitated a recovery plan. There is a risk of slippage on major roadmap deliverables caused by scope and timeline mismatches between supplier contracts and the programme roadmap, alongside solution and design gaps necessitating re-work. In January 2025 the IPA conducted an Assurance of Action Plan that rated the programme’s recovery plan as AMBER, giving confidence that once the recovery plan is executed, the programme will return to Amber status.","startDate":"2019-06-03","endDate":"2028-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2026 to 31/03/2028. This is primarily due to the following factors‚ Commercial issues persisted with delays to contract signature for NS&I’s core banking engine and with the delivery of NS&I’s new Business-to-Business capability. Their combined impact was to extend the outsourcing agreement with the existing supplier by 2 years to March 28. Programme recovery was also a factor, with the core element being a significant shift in delivery approach for the remaining milestones.","fyBaseline":342.8,"fyForecast":329.9,"fyVariance":3.76,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":2955.6,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased to 2955. This is primarily due to the following factors‚ The updated Full Business Case (FBC) was approved by Ministers and HM Treasury in Dec. 2024. This showed a cost increase over the previous 2023 Business Case in part due to inflation effects on rephased costs, increased solution complexity and increased incumbent and head office costs, as the transitional period for the programme was extended. Additional risk-based costs were also included to reflect solution uncertainty during the recovery period.","benefits":971.3,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 488 to 971. This is primarily due to the following factors‚ The updated Full Business Case (FBC) was approved by Ministers and HM Treasury at the end of 2024. This FBC is reporting benefits up to 2033-34, as compared to the previous FBC which reported benefits up to 2030-31.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at RED. This is primarily due to the following factors‚ Solution gaps and other serious risks to the Business Transformation Programme have necessitated a recovery plan. There is a risk of slippage on major roadmap…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2026 to 31/03/2028. This is primarily due to the following factors‚ Commercial issues persisted with delays to contract signature for NS&I’s core banking engine and with the delivery of NS&I’s new Business-to-Business capability. Their combined impact was to extend the outsourcing agreement with the existing supplier by 2 years to March 28. Programme recovery was also a factor, with the core element being a significant shift in delivery approach for the remaining milestones.","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":null,"attentionScore":49,"attentionReasons":["Current published delivery confidence is Red","In-year forecast variance is +43.0%"]},{"id":"MOD_0100_1516-Q1","year":2026,"name":"SKYNET 6 (AKA FBLOS)","department":"MOD","category":"Information and Communications Technology (ICT)","description":"Skynet 6 was established to replace the satellite communication services provided by the SKYNET 5 Public Finance Initiative with Airbus Defence and Space. When introduced it will provide continued satellite communications to 2042.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Red. This is primarily due to the following factors.. 1. Significant disparity between the programme’s scope and financial provision remains and cannot be aligned until the outcome of the Defence Investment Plan is known. 2. Resourcing constraints continue to impact delivery at programme level. Sub-par supplier performance continues to delay delivery of the first SKYNET 6 satellite.","startDate":"2011-01-01","endDate":"2041-12-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 31/12/2041.","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmental-agree monetised benefits at 25/26-Q4 remained at 0m.","themes":["Delivery & schedule","Commercial & supply chain","Cost & funding","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Red. This is primarily due to the following factors.. 1. Significant disparity between the programme’s scope and financial provision remains and cannot be aligned until the outcome of the Defence Investment Plan is known. 2. Resourcing…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 31/12/2041.","narrativeClaimKind":null,"history":[{"id":"MOD_0100_1516-Q1","year":2020,"name":"Future Beyond Line Of Sight","department":"MOD","category":"ICT","description":"Replaces the existing UK sovereign SKYNET 5 secure space-based satellite communications capability.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber/Red, which has not changed since last year�s Q2 1819 Amber/Red, due primarily to the following factors; - Delivery confidence remains unchanged however the underlying reasons are different from the previous years assessment. FY 19/20 saw several sequential approvals submitted through Defence and Other Government Departments (OGDs) as well as contracting for a new Client Side Support provider which created uncertainty within the programme. All are now complete so an improved rating is anticipated Since the Q2 1920 (30th September 2019) Amber/Red IPA DCA, the following non-project operating environment activities have impacted the original Q2 IPA DCA; - The 2019 General Election and HMT single year approvals drove delay into the investment approvals process. The programme continues to search for ways in which this lost time can be regained and has developed deeper professional relationships with OGDs to better manage this in future. - COVID-19 has impacted on the programme, predominately in the SKYNET 6 Service Delivery Wrap competition. Full COVID-19 consequences have not yet materialised, so it is not yet possible to determine the longer term programmatic impact. Since the Q2 1920 (30th September 2019) Amber/Red IPA DCA, the following primary project actions have impacted the original Q2 IPA DCA; - New Client Side Support partner effectively onboarded and providing significant support to programme, that improved many aspects previous reported as needing attention by IPA and DMPP reviews. All projected approvals have been completed. - New SRO, dedicating 50% of their time to FBLOS-SKYNET 6 was onboarded in Nov 19, a 1-year extension of the additional Programme Director to Oct 20 and completion of the recruitment into the Programme Management Office have all improved the management and governance of the programme.","startDate":"2011-01-01","endDate":"2041-12-31","scheduleNarrative":"The scheduled baseline project end date at Q2 1920 (30th September 2019) is 31/12/41, has not changed since last year's Q2 1819 date of 31/12/41, due primarily to the following factors; - The FBLOS capability planning assumption is a 15-year spacecraft life commencing 2027. This programme is analysing technological options and can only reassess the programme end date once this part of the programme (Enduring Capability project) reaches predicted Full Business Case in late 2021. - The end date is too far in the future and it is too early in the programme to accurately calculate any changes given the speed at which Space Technology is changing. It is not currently forecast that there is any circumstance that would need that date to be changed. Since the Q2 1920 (30th September 2019) baseline project end date of 31/12/41, the following non-project operating environment activities have impacted the original Q2 baseline project end date; - There are no known non-project operating environment activities that are expected to affect the 31/12/2041 date; it is too far in the future to predict and impact of any activity since Q2 19/20. Since the Q2 1920 (30th September 2019) baseline project end date of 31/12/41, the following primary project actions have impacted the original Q2 baseline project end date; - There are no known primary project actions that would affect the projects end date of 31/12/2041. The SKYNET 6 Enduring Capability project is still in assessment Phase and will not fully conclude until late 2021, when it is expected to down select the choices/options and make recommendations. - The provision of the SKYNET 6 Enduring Capability project Full Business Case in late 2021 is the first point at which any credible impact to the project end date of 31/12/2041 can credibly be assessed.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests)","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests)","benefits":null,"benefitsNarrative":"","themes":["Delivery & schedule","Workforce & capability","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber/Red, which has not changed since last year�s Q2 1819 Amber/Red, due primarily to the following factors; - Delivery confidence remains unchanged however the underlying reasons are different from the previous years assessment. FY 19/20 saw several sequential…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2020","sourceLabel":"IPA Annual Report 2019-20","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The scheduled baseline project end date at Q2 1920 (30th September 2019) is 31/12/41, has not changed since last year's Q2 1819 date of 31/12/41, due primarily to the following factors; - The FBLOS capability planning assumption is a 15-year spacecraft life commencing 2027. This programme is analysing technological options and can only reassess the programme end date once this part of the programme (Enduring Capability project) reaches predicted Full Business Case in late 2021. - The end date is too far in the future and it is too early in the programme to accurately calculate any changes given the speed at which Space Technology is changing. It is not currently forecast that there is any circumstance that would need that date to be changed. Since the Q2 1920 (30th September 2019) baseline project end date of 31/12/41, the following non-project operating environment activities have impacted the original Q2 baseline project end date; - There are no known non-project operating environment activities that are expected to affect the 31/12/2041 date; it is too far in the future to predict and impact of any activity since Q2 19/20. Since the Q2 1920 (30th September 2019) baseline project end date of 31/12/41, the following primary project actions have impacted the original Q2 baseline project end date; - There are no known primary project actions that would affect the projects end date of 31/12/2041. The SKYNET 6 Enduring Capability project is still in assessment Phase and will not fully conclude until late 2021, when it is expected to down select the choices/options and make recommendations. - The provision of the SKYNET 6 Enduring Capability project Full Business Case in late 2021 is the first point at which any credible impact to the project end date of 31/12/2041 can credibly be assessed.","narrativeClaimKind":null},{"id":"MOD_0100_1516-Q1","year":2021,"name":"Future Beyond Line Of Sight","department":"MOD","category":"ICT","description":"Replaces the existing UK sovereign SKYNET 5 secure space-based satellite communications capability.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber/red. This is primarily due to the following factors: Since the last report at 30 September 2021, the operating environment has been impacted by Covid-19 with associated delay experienced on the Assessment Phase of the Service Delivery Wrap and additional risk to the Concept Phase of the Enduring Capability project. Mitigation measures have been set in place for the delay to Service Delivery Wrap, which will ensure continuity of service delivery at the end of the SKYNET 5 Private Finance Initiative contract in August 22.�","startDate":"2011-01-01","endDate":"2041-12-31","scheduleNarrative":"Compared to financial year 19/20-Q2, the project's end-date remained scheduled to finish on 31 December 2041 . This is primarily due to the following factors:","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"","themes":["Delivery & schedule","Commercial & supply chain","Cost & funding","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber/red. This is primarily due to the following factors: Since the last report at 30 September 2021, the operating environment has been impacted by Covid-19 with associated delay experienced on the Assessment Phase of the Service…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 19/20-Q2, the project's end-date remained scheduled to finish on 31 December 2041 . This is primarily due to the following factors:","narrativeClaimKind":null},{"id":"MOD_0100_1516-Q1","year":2022,"name":"Future Beyond Line Of Sight","department":"MOD","category":"ICT","description":"Under the Future Beyond Line Of Sight - SKYNET 6 programme the MOD will deliver and manage military Core Satellite Communications (SATCOM) services from September 22. This will include a new Service Delivery contract to take on existing core services and procurement of the next generation of space-based SATCOM capability.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating increased from Amber/Red to Amber. This is primarily due to the following factors: The removal of the incremental Amber/Red and Amber/Green assessment ratings. The programme's first delivery and new arrangements to replace the SKYNET 5 PFI contracted service are expected to be successfully achieved in August 2022. However, there is increased risk to the schedule for the delivery of the later satellites that are under active mitigation measures. There are significant shortages of skilled people in this sector with Defence needing to become more competitive to secure such resource.","startDate":"2011-01-01","endDate":"2041-12-31","scheduleNarrative":"Compared to 2021-Q4 the project end-date remained scheduled to finish on 31 December 41.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests)","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests)","benefits":null,"benefitsNarrative":"","themes":["Delivery & schedule","Commercial & supply chain","Cost & funding","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating increased from Amber/Red to Amber. This is primarily due to the following factors: The removal of the incremental Amber/Red and Amber/Green assessment ratings. The programme's first delivery and new arrangements to replace the SKYNET 5 PFI…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to 2021-Q4 the project end-date remained scheduled to finish on 31 December 41.","narrativeClaimKind":null},{"id":"MOD_0100_1516-Q1","year":2023,"name":"Skynet 6 (aka FBLOS)","department":"MOD","category":"ICT","description":"SKYNET 6 programme the MOD will deliver and manage military Core Satellite Communications (SATCOM) services from September 22. This will include a new Service Delivery contract to take on existing core services and procurement of the next generation of space-based SATCOM capability.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. The 6A satellite project remains on track to deliver in 2025 with 4-months schedule contingency. There remains, however, significant risk attached to a programme with this level of complexity and challenge.","startDate":"2011-01-01","endDate":"2041-12-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2041-12-31. This is primarily due to the following factors. NA","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This programme does not report cashable benefits. Its aim is to provision the armed forces with the equipment and / or infrastructure required.","themes":["Commercial & supply chain","Delivery & schedule","Cost & funding"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. The 6A satellite project remains on track to deliver in 2025 with 4-months schedule contingency. There remains, however, significant risk attached to a programme with…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2041-12-31. This is primarily due to the following factors. NA","narrativeClaimKind":null},{"id":"MOD_0100_1516-Q1","year":2024,"name":"Skynet 6 (aka FBLOS)","department":"MOD","category":"ICT","description":"SKYNET has provided Satellite Communications to Defence and other Government Departments since the 1960s. The SKYNET 6 Programme will provide a continuity of services to all military satellite requirements. This includes a new Service Delivery contract to take on existing core services and procurement of the next generation of space-based SATCOM capability.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 has remained at Amber. This is primarily due to the following factors. Transition to a new Skynet Service Continuity Contract was successfully completed in February 2024. However, supply chain issues will delay Satellite delivery. The Programme continues to be impacted by people resource shortfalls exacerbated by civil service recruitment restrictions imposed in 2023.","startDate":"2011-01-01","endDate":"2041-12-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained scheduled to finish on 2041-12-31.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":0.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 0m.","themes":["Commercial & supply chain","Delivery & schedule","Cost & funding","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 has remained at Amber. This is primarily due to the following factors. Transition to a new Skynet Service Continuity Contract was successfully completed in February 2024. However, supply chain issues will delay Satellite delivery. The…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained scheduled to finish on 2041-12-31.","narrativeClaimKind":null},{"id":"MOD_0100_1516-Q1","year":2025,"name":"SKYNET 6 (AKA FBLOS)","department":"MoD","category":"Military Capability","description":"SKYNET 6 delivered by Defence Digital in conjunction with UK Space Command will provide the next generation of space-based SATCOM capability by replacing current services currently provided by the SKYNET 5 Public Finance Initiative out to 2042.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is RED, compared with the project's assessment last year of AMBER. This is due to the following factors. Departmental wide resourcing and recruitment constraints have led to workforce shortages. Coupled with sub-par supplier performance has delayed delivery of the first SKYNET 6 satellite.","startDate":"2011-01-01","endDate":"2041-12-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/12/2041. This is primarily due to the following factors.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 43 - Commercial interests","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0.","themes":["Commercial & supply chain","Delivery & schedule","Workforce & capability","Cost & funding"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is RED, compared with the project's assessment last year of AMBER. This is due to the following factors. Departmental wide resourcing and recruitment constraints have led to workforce shortages. Coupled with sub-par supplier performance has delayed delivery of the first…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/12/2041. This is primarily due to the following factors.","narrativeClaimKind":null},{"id":"MOD_0100_1516-Q1","year":2026,"name":"SKYNET 6 (AKA FBLOS)","department":"MOD","category":"Information and Communications Technology (ICT)","description":"Skynet 6 was established to replace the satellite communication services provided by the SKYNET 5 Public Finance Initiative with Airbus Defence and Space. When introduced it will provide continued satellite communications to 2042.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Red. This is primarily due to the following factors.. 1. Significant disparity between the programme’s scope and financial provision remains and cannot be aligned until the outcome of the Defence Investment Plan is known. 2. Resourcing constraints continue to impact delivery at programme level. Sub-par supplier performance continues to delay delivery of the first SKYNET 6 satellite.","startDate":"2011-01-01","endDate":"2041-12-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 31/12/2041.","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmental-agree monetised benefits at 25/26-Q4 remained at 0m.","themes":["Delivery & schedule","Commercial & supply chain","Cost & funding","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Red. This is primarily due to the following factors.. 1. Significant disparity between the programme’s scope and financial provision remains and cannot be aligned until the outcome of the Defence Investment Plan is known. 2. Resourcing…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 31/12/2041.","narrativeClaimKind":null}],"previous":{"id":"MOD_0100_1516-Q1","year":2025,"name":"SKYNET 6 (AKA FBLOS)","department":"MoD","category":"Military Capability","description":"SKYNET 6 delivered by Defence Digital in conjunction with UK Space Command will provide the next generation of space-based SATCOM capability by replacing current services currently provided by the SKYNET 5 Public Finance Initiative out to 2042.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is RED, compared with the project's assessment last year of AMBER. This is due to the following factors. Departmental wide resourcing and recruitment constraints have led to workforce shortages. Coupled with sub-par supplier performance has delayed delivery of the first SKYNET 6 satellite.","startDate":"2011-01-01","endDate":"2041-12-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/12/2041. This is primarily due to the following factors.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 43 - Commercial interests","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0.","themes":["Commercial & supply chain","Delivery & schedule","Workforce & capability","Cost & funding"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is RED, compared with the project's assessment last year of AMBER. This is due to the following factors. Departmental wide resourcing and recruitment constraints have led to workforce shortages. Coupled with sub-par supplier performance has delayed delivery of the first…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/12/2041. This is primarily due to the following factors.","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":0,"attentionScore":49,"attentionReasons":["Current published delivery confidence is Red","In-year forecast variance is +43.0%"]},{"id":"MOD_0140_2122-Q1","year":2026,"name":"SPEARCAP 3","department":"MOD","category":"Military Capability","description":"This programme aims to achieve delivery and integration of Spear Cap 3, which will deliver the principal air-to-ground weapon for UK F-35 and is critical to the aircraft's Attack and Control of the Air capabilities in contested environments.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Red. This is primarily due to the following factors. 1. Owing to compounded delays and the requirement to fully re-baseline the programme. 2. Dependencies on the reprofiled F-35B integration timeline, along with ongoing challenges in equipment programme maturity and resourcing remain key factors. 3. A Review Note detailing the re-baseline requirements, when approved, will give rise to a more definitive delivery confidence assessment.","startDate":"2020-09-30","endDate":"2047-12-31","scheduleNarrative":"Exempt under Section 27 - International relations","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Compared to financial year 2024/25-Q4, the project's departmental-agreed monetised benefits at 2025/26-Q4 remained at £0m.","themes":["Scope & requirements","Commercial & supply chain","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Red. This is primarily due to the following factors. 1. Owing to compounded delays and the requirement to fully re-baseline the programme. 2. Dependencies on the reprofiled F-35B integration timeline, along with ongoing challenges in…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 27 - International relations","narrativeClaimKind":null,"history":[{"id":"MOD_0140_2122-Q1","year":2022,"name":"Spearcap 3","department":"MOD","category":"Military Capability","description":"Spear Cap 3 will deliver the principal air-to-air ground weapon for UK F-35 and is critical to the aircraft's Attack and Control of the Air capabilities in contested environments.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Spear Cap 3 Programme was previously contained within the Complex Weapons Portfolio and has been extracted to allow for better targeted approval and assurance processes. As such it is not possible to comment on its Delivery Confidence in March 21. However, it is currently assessed as Amber by the Senior Responsible Owner.","startDate":"2020-09-30","endDate":"2027-06-30","scheduleNarrative":"The Spear Cap 3 Programme was previously contained within the Complex Weapons Portfolio and has been extracted to allow for better targeted approval and assurance processes. As such there is no baseline date recorded for March 21 for comparison. However, closure is currently forecast to be December 47","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests)","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests)","benefits":null,"benefitsNarrative":"","themes":["Approvals & decisions","Commercial & supply chain","Governance & assurance","Delivery & schedule"],"evidenceExcerpt":"The Spear Cap 3 Programme was previously contained within the Complex Weapons Portfolio and has been extracted to allow for better targeted approval and assurance processes. As such it is not possible to comment on its Delivery Confidence in March 21. However, it is currently assessed as Amber by the Senior Responsible Owner. The Spear Cap 3 Programme was…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The Spear Cap 3 Programme was previously contained within the Complex Weapons Portfolio and has been extracted to allow for better targeted approval and assurance processes. As such there is no baseline date recorded for March 21 for comparison. However, closure is currently forecast to be December 47","narrativeClaimKind":null},{"id":"MOD_0140_2122-Q1","year":2023,"name":"Spearcap 3","department":"MOD","category":"Military Capability","description":"Spear Cap 3 will deliver the principal air-to-airground weapon for UK F-35 and is critical to the aircraft's Attack and Control of the Air capabilities in contested environments.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 decreased from Amber (IPA rating) to Red (SRO rating). This is primarily due to the following factors. There are challenges with resourcing sufficient suitably qualified and experienced people across the programme and delivery teams, and within industry. A series of deep-dives, along with a monthly Programme Board with the new Senior Responsible Owner have been put in place to address these challenges. Programme Governance and the availability Management Information is also being refreshed alongside a plan to improve Programme performance. Opportunities are being identified to bring schedule back within the approved timeline. The programme is also exploring opportunities to spiral capability developments to ensure capability is delivered at the earliest opportunity.","startDate":"2020-09-30","endDate":"2047-12-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 increased from 2027-06-30 to 2047-12-31. This is primarily due to the following factors. Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This programme does not report cashable benefits. Its aim is to provision the armed forces with the equipment and / or infrastructure required.","themes":["Commercial & supply chain","Delivery & schedule","Governance & assurance","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 decreased from Amber (IPA rating) to Red (SRO rating). This is primarily due to the following factors. There are challenges with resourcing sufficient suitably qualified and experienced people across the programme and delivery teams, and within industry. A series of…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 increased from 2027-06-30 to 2047-12-31. This is primarily due to the following factors. Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","narrativeClaimKind":null},{"id":"MOD_0140_2122-Q1","year":2024,"name":"Spearcap 3","department":"MOD","category":"Military Capability","description":"This programme aims to achieve delivery and integration of Spear Cap 3; which will deliver the principal air-to-ground weapon for UK F-35 and is critical to the aircraft's Attack and Control of the Air capabilities in contested environments.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure and Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Red. This is primarily due to the following factors. Compounded delays and issues have led to a requirement to re-baseline the programme. There are challenges with resourcing sufficient suitably qualified and experienced people across defence, the programme and delivery teams; and within industry. Programme governance and the availability management information is also being refreshed alongside a plan to improve Programme performance. Opportunities to spiral capability developments to ensure capability is delivered at the earliest opportunity are being considered by the SRO.","startDate":"2020-09-30","endDate":"2030-12-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 decreased from 2047-12-31 to 2030-12-31. This is primarily due to the following factors. The previous programme end date provided was the Out of Service date, but now reflects the date at which the capability has been delivered and the programme team will no longer be required. The programme is currently undergoing a rebaselining which may further affect the programme end date.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":0.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 0m.","themes":["Commercial & supply chain","Workforce & capability","Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure and Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Red. This is primarily due to the following factors. Compounded delays and issues have led to a requirement to re-baseline the programme. There are challenges with resourcing sufficient suitably qualified and…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 decreased from 2047-12-31 to 2030-12-31. This is primarily due to the following factors. The previous programme end date provided was the Out of Service date, but now reflects the date at which the capability has been delivered and the programme team will no longer be required. The programme is currently undergoing a rebaselining which may further affect the programme end date.","narrativeClaimKind":null},{"id":"MOD_0140_2122-Q1","year":2025,"name":"SPEARCAP 3","department":"MoD","category":"Military Capability","description":"This programme aims to achieve delivery and integration of Spear Cap 3, which will deliver the principal air-to-ground weapon for UK F-35 and is critical to the aircraft's Attack and Control of the Air capabilities in contested environments.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to the financial year 23/24 Q4, the NISTA Delivery confidence Assessment rating remained at Red. This is primarily due to the following factors: The integration of the missile onto F35B is almost exclusively dependent on the schedule of the aircraft production and subsequent delivery into service. As the integration timeline is currently uncertain it is prudent to reflect this in continued Reduced delivery confidence. However, there was a successful guided firing trial of the missile in November 2024","startDate":"2020-09-30","endDate":"2056-09-20","scheduleNarrative":"Section 27 - International relations","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 43 - Commercial interests","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":0.0,"benefitsNarrative":"Compared to financial year 2023/24-Q4, the project's departmental-agreed monetised benefits at 2024/25-Q4 remained at £0m. No monetised benefits","themes":["Delivery & schedule","Commercial & supply chain","Technical & integration","Cost & funding"],"evidenceExcerpt":"Compared to the financial year 23/24 Q4, the NISTA Delivery confidence Assessment rating remained at Red. This is primarily due to the following factors: The integration of the missile onto F35B is almost exclusively dependent on the schedule of the aircraft production and subsequent delivery into service. As the integration timeline is currently uncertain…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Section 27 - International relations","narrativeClaimKind":null},{"id":"MOD_0140_2122-Q1","year":2026,"name":"SPEARCAP 3","department":"MOD","category":"Military Capability","description":"This programme aims to achieve delivery and integration of Spear Cap 3, which will deliver the principal air-to-ground weapon for UK F-35 and is critical to the aircraft's Attack and Control of the Air capabilities in contested environments.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Red. This is primarily due to the following factors. 1. Owing to compounded delays and the requirement to fully re-baseline the programme. 2. Dependencies on the reprofiled F-35B integration timeline, along with ongoing challenges in equipment programme maturity and resourcing remain key factors. 3. A Review Note detailing the re-baseline requirements, when approved, will give rise to a more definitive delivery confidence assessment.","startDate":"2020-09-30","endDate":"2047-12-31","scheduleNarrative":"Exempt under Section 27 - International relations","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Compared to financial year 2024/25-Q4, the project's departmental-agreed monetised benefits at 2025/26-Q4 remained at £0m.","themes":["Scope & requirements","Commercial & supply chain","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Red. This is primarily due to the following factors. 1. Owing to compounded delays and the requirement to fully re-baseline the programme. 2. Dependencies on the reprofiled F-35B integration timeline, along with ongoing challenges in…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 27 - International relations","narrativeClaimKind":null}],"previous":{"id":"MOD_0140_2122-Q1","year":2025,"name":"SPEARCAP 3","department":"MoD","category":"Military Capability","description":"This programme aims to achieve delivery and integration of Spear Cap 3, which will deliver the principal air-to-ground weapon for UK F-35 and is critical to the aircraft's Attack and Control of the Air capabilities in contested environments.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to the financial year 23/24 Q4, the NISTA Delivery confidence Assessment rating remained at Red. This is primarily due to the following factors: The integration of the missile onto F35B is almost exclusively dependent on the schedule of the aircraft production and subsequent delivery into service. As the integration timeline is currently uncertain it is prudent to reflect this in continued Reduced delivery confidence. However, there was a successful guided firing trial of the missile in November 2024","startDate":"2020-09-30","endDate":"2056-09-20","scheduleNarrative":"Section 27 - International relations","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 43 - Commercial interests","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":0.0,"benefitsNarrative":"Compared to financial year 2023/24-Q4, the project's departmental-agreed monetised benefits at 2024/25-Q4 remained at £0m. No monetised benefits","themes":["Delivery & schedule","Commercial & supply chain","Technical & integration","Cost & funding"],"evidenceExcerpt":"Compared to the financial year 23/24 Q4, the NISTA Delivery confidence Assessment rating remained at Red. This is primarily due to the following factors: The integration of the missile onto F35B is almost exclusively dependent on the schedule of the aircraft production and subsequent delivery into service. As the integration timeline is currently uncertain…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Section 27 - International relations","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":-3186,"attentionScore":49,"attentionReasons":["Current published delivery confidence is Red","In-year forecast variance is +43.0%"]},{"id":"MOD_0112_1718-Q1","year":2026,"name":"TYPE 31","department":"MOD","category":"Military Capability","description":"The Type 31 general purpose frigate programme is designed to deliver a general purpose frigate capability and act as the pathfinder programme for the Government’s National Shipbuilding Strategy. T31 will be at the heart of the Royal Navy’s surface fleet, deterring aggression and maintaining the security of the UK’s interests. They will work alongside our Allies to deliver a credible UK warship presence across the globe. Flexible and adaptable by design, T31 frigates will undertake missions such as interception and disruption of those using the sea for unlawful purposes, collecting intelligence, conducting defence engagement, and assisting those in need.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Red. This is primarily due to the following factors‚ 1. Successful delivery to meet the User Requirements remains on track, but the impact of inflation will require a reset of the programme’s Approved Budgetary Limit following announcement of the Defence Investment Plan. 2. Challenges also remain in the first of class schedule against an ambitious build timeline, and the complex integration challenges.","startDate":"2016-04-01","endDate":"2033-07-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme end-date at 25/26-Q4 remained the same at 31/05/2030.","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Commercial & supply chain","Delivery & schedule","Cost & funding","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Red. This is primarily due to the following factors‚ 1. Successful delivery to meet the User Requirements remains on track, but the impact of inflation will require a reset of the programme’s Approved Budgetary Limit following announcement…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the programme end-date at 25/26-Q4 remained the same at 31/05/2030.","narrativeClaimKind":null,"history":[{"id":"MOD_0112_1718-Q1","year":2020,"name":"Type 31e","department":"MOD","category":"Military Capability","description":"Aims to deliver a pipeline of credible, affordable and exportable warships enabling Defence to increase its global footprint.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber, due primarily to the following factors; - In order to achieve contract award by mid-November, as challenged by the Prime Minister, cross-Government investment approvals were required by no later than 31 Oct 19. A recent Project Assessment Review (PAR) was conducted in September 19 concluded that a Delivery Confidence Assessment of Amber was considered appropriate. The review team assessed that programme success was achievable, but that two necessary actions must be implemented as soon as practicable. The first action was to resolve the programme's affordability challenge, requiring the Department to prioritise the project within the wider Defence portfolio. The second action was to ensure that full cross-Government approvals were achieved before the fixed price contract offer expiry date of 31 Dec 19. Since the Q2 1920 (30th September 2019) Amber IPA DCA, the following primary project actions have impacted the original Q2 IPA DCA; - Cross-Government investment approvals were achieved by the end of Oct 19, permitting award of the T31 Design & Build contract in Nov 19.","startDate":"2016-04-01","endDate":"2030-02-28","scheduleNarrative":"The scheduled project end date at Q2 1920 (30th September 2019) is 28/02/30, due primarily to the following factors; - Project closure is baseline for 2030, it is too early to predict any change to the forecast. - The baseline date is based upon the delivery date of the final ship, with an additional programme of work post-delivery to account for acceptance, safety, sea trials and training activities.","fyBaseline":13.24,"fyForecast":12.76,"fyVariance":-4.0,"varianceNarrative":"Budget variance less than 5%","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests)","benefits":null,"benefitsNarrative":"","themes":["Commercial & supply chain","Delivery & schedule","Governance & assurance","Cost & funding"],"evidenceExcerpt":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber, due primarily to the following factors; - In order to achieve contract award by mid-November, as challenged by the Prime Minister, cross-Government investment approvals were required by no later than 31 Oct 19. A recent Project Assessment Review (PAR) was…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2020","sourceLabel":"IPA Annual Report 2019-20","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The scheduled project end date at Q2 1920 (30th September 2019) is 28/02/30, due primarily to the following factors; - Project closure is baseline for 2030, it is too early to predict any change to the forecast. - The baseline date is based upon the delivery date of the final ship, with an additional programme of work post-delivery to account for acceptance, safety, sea trials and training activities.","narrativeClaimKind":null},{"id":"MOD_0112_1718-Q1","year":2021,"name":"Type 31","department":"MOD","category":"Military Capability","description":"The T31 programme is designed to deliver a general-purpose frigate capability and act as the pathfinder programme for the National Shipbuilding Strategy. From the mid-2020s, T31 will be at the heart of the Royal Navy's surface fleet, deterring aggression and maintaining the security of the UK's interests. They will work alongside our Allies to deliver credible UK warship presence across the globe. Flexible and adaptable by design, T31 frigates will undertake missions such as interception and disruption of those using the sea for unlawful purposes, collecting intelligence, conducting defence engagement and assisting those in need.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber. This is primarily due to the following factors: Reinforced by recent Infrastructure and Projects Authority Gateway 0 Review, Delivery Confidence of Amber is still considered appropriate given the COVID-19 pandemic and the likely impacts on the design work and�supply chain. During the final quarter of financial year 20/21, the shipbuilder made�good progress on the design and engineering work, successfully passing the independently-chaired Whole Ship Critical Design Review in February 2021. Similarly, the pace of construction of the new infrastructure upgrades has been maintained. In addition the significant achievement in the award of a key Ministry Of Defence contract to MBDA for provision of the Sea Ceptor missile system which will be the Type 31's primary air defence weapon system has been realised. This contract will ensure that MBDA, Babcock and Thales as the Combat System lead can integrate this significant capability into the Type 31. The most significant risk to the programme at this stage remains the Ministry Of Defences' and Contractors' ability to deliver information, equipment and services from the entire supply chain for the ship design, integration and build.","startDate":"2016-04-01","endDate":"2030-05-31","scheduleNarrative":"Compared to financial year 19/20-Q2, the project's end-date increased from 31 March 2029 to 31 May 2030 . This is primarily due to the following factors: This is because in the last reporting year the project was pre-contract and the end date was therefore based on a historic planning assumption in FY19/20. The end date now reflects the contractual obligation for the fifth ship to be delivered by end 2028 plus the requirement for the Royal Navy to deliver the full suite of crew training and capability integration post-contract. The schedule was produced under competitive tension, which is the basis of the value for money assessment and approval of the final business case.","fyBaseline":192.5,"fyForecast":177.86,"fyVariance":-8.0,"varianceNarrative":"The budget variance exceeds 5%. An 8% variance is recorded against Financial Year 20/21 as a result of paying a contract milestone payment 1 month early, bringing it forward from FY20/21 into 19/20.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"","themes":["Commercial & supply chain","Delivery & schedule","Cost & funding","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber. This is primarily due to the following factors: Reinforced by recent Infrastructure and Projects Authority Gateway 0 Review, Delivery Confidence of Amber is still considered appropriate given the COVID-19 pandemic and the…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 19/20-Q2, the project's end-date increased from 31 March 2029 to 31 May 2030 . This is primarily due to the following factors: This is because in the last reporting year the project was pre-contract and the end date was therefore based on a historic planning assumption in FY19/20. The end date now reflects the contractual obligation for the fifth ship to be delivered by end 2028 plus the requirement for the Royal Navy to deliver the full suite of crew training and capability integration post-contract. The schedule was produced under competitive tension, which is the basis of the value for money assessment and approval of the final business case.","narrativeClaimKind":null},{"id":"MOD_0112_1718-Q1","year":2022,"name":"Type 31e","department":"MOD","category":"Military Capability","description":"The Type 31 general purpose frigate programme is designed to deliver a general-purpose frigate capability and act as the pathfinder programme for the National Shipbuilding Strategy. From the mid-2020s, Type 31 will be at the heart of the Royal Navy's surface fleet, deterring aggression and maintaining the security of the UK's interests. They will work alongside our Allies to deliver a credible UK warship presence across the globe. Flexible and adaptable by design, Type 31 frigates will undertake missions such as interception and disruption of those using the sea for unlawful purposes, collecting intelligence, conducting defence engagement and assisting those in need.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber. This is primarily due to the following factors: Successful delivery appears feasible but significant issues already exist, requiring sustained management attention and mitigation, which are in place for these issues. Amber is considered appropriate, given the COVID-19 pandemic impacts on the programme and the complex activities associated with delivering the full capability of a \"new to service\" combat system and its associated systems.","startDate":"2016-04-01","endDate":"2029-03-31","scheduleNarrative":"Compared to 2021-Q4 the project end-date decreased from 31 May 2030 to 31 March 2029. This is primarily due to the following factors: The ship builder maintained the baseline schedule agreed during the start of the contract and despite pandemic challenges, last year they managed to achieve all contractual milestones. The schedule is taut and exposed to risk from complex mission systems integration and Global economic and supply chain challenges that require continued management.","fyBaseline":241.28,"fyForecast":242.19,"fyVariance":0.0,"varianceNarrative":"The budget variance is inferior or equal to 5%.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests)","benefits":null,"benefitsNarrative":"","themes":["Delivery & schedule","Commercial & supply chain","Cost & funding","Technical & integration"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber. This is primarily due to the following factors: Successful delivery appears feasible but significant issues already exist, requiring sustained management attention and mitigation, which are in place for these issues. Amber is…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to 2021-Q4 the project end-date decreased from 31 May 2030 to 31 March 2029. This is primarily due to the following factors: The ship builder maintained the baseline schedule agreed during the start of the contract and despite pandemic challenges, last year they managed to achieve all contractual milestones. The schedule is taut and exposed to risk from complex mission systems integration and Global economic and supply chain challenges that require continued management.","narrativeClaimKind":null},{"id":"MOD_0112_1718-Q1","year":2023,"name":"Type 31e","department":"MOD","category":"Military Capability","description":"The Type 31 general purpose frigate programme is designed to deliver a general-purpose frigate capability and act as the pathfinder programme for the National Shipbuilding Strategy. From the mid-2020s, Type 31 will be at the heart of the Royal Navy's surface fleet, deterring aggression and maintaining the security of the UK's interests. They will work alongside our Allies to deliver a credible UK warship presence across the globe. Flexible and adaptable by design, Type 31 frigates will undertake missions such as interception and disruption of those using the sea for unlawful purposes, collecting intelligence, conducting defence engagement and assisting those in need.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber (SRO rating). This is primarily due to the following factors. Successful delivery appears feasible but significant issues already exist requiring sustained management attention and mitigation, which are in place for these issues. Amber is considered appropriate given the COVID-19 pandemic impacts on the programme, supply chain issues as a result of the conflict in Ukraine, and the complex activities associated with delivering the full capability of a `new to service` combat system and its associated systems. In addition to this, inflation uncertainty, supply chain impacts as a result of Global events, and Royal Navy personnel challenges in areas of key engineering skills remain significant risks for the programme.","startDate":"2016-04-01","endDate":"2029-03-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2029-03-31. This is primarily due to the following factors. NA","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This programme does not report cashable benefits. Its aim is to provision the armed forces with the equipment and / or infrastructure required.","themes":["Commercial & supply chain","Delivery & schedule","Cost & funding","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber (SRO rating). This is primarily due to the following factors. Successful delivery appears feasible but significant issues already exist requiring sustained management attention and mitigation, which are in place for these issues. Amber is considered…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2029-03-31. This is primarily due to the following factors. NA","narrativeClaimKind":null},{"id":"MOD_0112_1718-Q1","year":2024,"name":"Type 31e","department":"MOD","category":"Military Capability","description":"The Type 31 (T31) general purpose frigate programme is designed to deliver a general-purpose frigate capability and act as the pathfinder programme for the Government's National Shipbuilding Strategy. From the mid-2020s, T31 will be at the heart of the Royal Navy’s surface fleet, deterring aggression and maintaining the security of the UK’s interests. They will work alongside our Allies to deliver a credible UK-warship presence across the globe. Flexible and adaptable by design, T31 frigates will undertake missions such as interception and disruption of those using the sea for unlawful purposes, collecting intelligence, conducting defence engagement and assisting those in need.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remain at Amber. This is primarily due to the following factors. Successful delivery appears feasible but significant issues remain, requiring sustained management attention and mitigation. A commercial dispute with the Shipbuilder has been settled and the impact of inflation and a shortage of shipbuilding skills have been partially mitigated. Challenges also remain in proving the first of Class against an ambitious build timeline, a new combat system for the Royal Navy and the complex integration challenge.","startDate":"2016-04-01","endDate":"2030-05-31","scheduleNarrative":"Compared to financial year 22/23-Q4 the project's end-date at 23/24-Q4 increased from 2029-03-31 to 2030-05-31. This is primarily due to the following factors. Pressure to the schedule following dispute settlement is being assessed through schedule risk analysis and identification of opportunities between the MOD and Contractor. Any identified impact to Approved Dates will be subject to GMPP governance processes with the appropriate Approval Authorities.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.)","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.)","benefits":0.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 0m.","themes":["Commercial & supply chain","Delivery & schedule","Cost & funding","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remain at Amber. This is primarily due to the following factors. Successful delivery appears feasible but significant issues remain, requiring sustained management attention and mitigation. A commercial dispute with the Shipbuilder has been…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 22/23-Q4 the project's end-date at 23/24-Q4 increased from 2029-03-31 to 2030-05-31. This is primarily due to the following factors. Pressure to the schedule following dispute settlement is being assessed through schedule risk analysis and identification of opportunities between the MOD and Contractor. Any identified impact to Approved Dates will be subject to GMPP governance processes with the appropriate Approval Authorities.","narrativeClaimKind":null},{"id":"MOD_0112_1718-Q1","year":2025,"name":"TYPE 31","department":"MoD","category":"Military Capability","description":"The Type 31 general purpose frigate programme is designed to deliver a general-purpose frigate capability and act as the pathfinder programme for the Government's National Shipbuilding Strategy. Type 31 will be at the heart of the Royal Navy’s surface fleet, deterring aggression and maintaining the security of the UK’s interests. They will work alongside our Allies to deliver a credible UK-warship presence across the globe. Flexible and adaptable by design, Type 31 frigates will undertake missions such as interception and disruption of those using the sea for unlawful purposes, collecting intelligence, conducting defence engagement and assisting those in need.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is RED, compared with the project's assessment last year of AMBER. This is due to the following factors. Successful delivery to meet the user requirements remains on track, but the impact of inflation will require a reset of the programme’s Approved Budgetary Limit. Challenges also remain in the first of class schedule against an ambitious build timeline, developing a new combat system for the Royal Navy and the complex integration challenge.","startDate":"2016-04-01","endDate":null,"scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/05/2030. .","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 43 - Commercial interests","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits","themes":["Commercial & supply chain","Delivery & schedule","Cost & funding","Scope & requirements"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is RED, compared with the project's assessment last year of AMBER. This is due to the following factors. Successful delivery to meet the user requirements remains on track, but the impact of inflation will require a reset of the programme’s Approved Budgetary Limit.…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/05/2030. .","narrativeClaimKind":null},{"id":"MOD_0112_1718-Q1","year":2026,"name":"TYPE 31","department":"MOD","category":"Military Capability","description":"The Type 31 general purpose frigate programme is designed to deliver a general purpose frigate capability and act as the pathfinder programme for the Government’s National Shipbuilding Strategy. T31 will be at the heart of the Royal Navy’s surface fleet, deterring aggression and maintaining the security of the UK’s interests. They will work alongside our Allies to deliver a credible UK warship presence across the globe. Flexible and adaptable by design, T31 frigates will undertake missions such as interception and disruption of those using the sea for unlawful purposes, collecting intelligence, conducting defence engagement, and assisting those in need.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Red. This is primarily due to the following factors‚ 1. Successful delivery to meet the User Requirements remains on track, but the impact of inflation will require a reset of the programme’s Approved Budgetary Limit following announcement of the Defence Investment Plan. 2. Challenges also remain in the first of class schedule against an ambitious build timeline, and the complex integration challenges.","startDate":"2016-04-01","endDate":"2033-07-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme end-date at 25/26-Q4 remained the same at 31/05/2030.","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Commercial & supply chain","Delivery & schedule","Cost & funding","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Red. This is primarily due to the following factors‚ 1. Successful delivery to meet the User Requirements remains on track, but the impact of inflation will require a reset of the programme’s Approved Budgetary Limit following announcement…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the programme end-date at 25/26-Q4 remained the same at 31/05/2030.","narrativeClaimKind":null}],"previous":{"id":"MOD_0112_1718-Q1","year":2025,"name":"TYPE 31","department":"MoD","category":"Military Capability","description":"The Type 31 general purpose frigate programme is designed to deliver a general-purpose frigate capability and act as the pathfinder programme for the Government's National Shipbuilding Strategy. Type 31 will be at the heart of the Royal Navy’s surface fleet, deterring aggression and maintaining the security of the UK’s interests. They will work alongside our Allies to deliver a credible UK-warship presence across the globe. Flexible and adaptable by design, Type 31 frigates will undertake missions such as interception and disruption of those using the sea for unlawful purposes, collecting intelligence, conducting defence engagement and assisting those in need.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is RED, compared with the project's assessment last year of AMBER. This is due to the following factors. Successful delivery to meet the user requirements remains on track, but the impact of inflation will require a reset of the programme’s Approved Budgetary Limit. Challenges also remain in the first of class schedule against an ambitious build timeline, developing a new combat system for the Royal Navy and the complex integration challenge.","startDate":"2016-04-01","endDate":null,"scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/05/2030. .","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 43 - Commercial interests","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits","themes":["Commercial & supply chain","Delivery & schedule","Cost & funding","Scope & requirements"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is RED, compared with the project's assessment last year of AMBER. This is due to the following factors. Successful delivery to meet the user requirements remains on track, but the impact of inflation will require a reset of the programme’s Approved Budgetary Limit.…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/05/2030. .","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":null,"attentionScore":49,"attentionReasons":["Current published delivery confidence is Red","In-year forecast variance is +43.0%"]},{"id":"DCMS_0019_2021-Q4","year":2026,"name":"Project Gigabit","department":"DSIT","category":"Infrastructure and Construction","description":"Project Gigabit provides gigabit-capable connectivity to homes and businesses that are not included in suppliers' commercial plans. The programme target is for next-generation gigabit broadband to be available nationwide by 2032.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at AMBER. UK Gigabit coverage reached 90.76% in June 2026, according to ThinkBroadband. The programme is progressing largely to plan but there are some concerns over supplier access to finance and supply chain risks which may impact delivery.","startDate":"2021-04-01","endDate":"2032-12-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 has been extended to 31/12/2032. This is to reflect a revised delivery timeline.","fyBaseline":686.07,"fyForecast":486.34,"fyVariance":29.11,"varianceNarrative":"The budget variance is a result of factors including the need for projects to re-plan to take account of changes in commercial coverage, and supplier delivery issues including highways access and wayleaves.","wholeLifeCost":5214.96,"costNarrative":"Compared to financial year 24/25-Q4 of £5,404m, the project’s departmentally agreed Whole Life Cost at 25/26-Q4 decreased to £4,831m. This is primarily due to the following factors, updated Open Market Review has fed into updated Central Delivery Forecast Model.","benefits":3967.67,"benefitsNarrative":"The baseline benefits have remained at £5,434m (between Q4 2024/24 and Q4 2025/26) as the same return has been reported during this period.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at AMBER. UK Gigabit coverage reached 90.76% in June 2026, according to ThinkBroadband. The programme is progressing largely to plan but there are some concerns over supplier access to finance and supply chain risks which may impact delivery.…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 has been extended to 31/12/2032. This is to reflect a revised delivery timeline.","narrativeClaimKind":null,"history":[{"id":"DCMS_0019_2021-Q4","year":2021,"name":"UK Gigabit Programme","department":"DCMS","category":"Infrastructure and Construction","description":"The UK Gigabit Programme (Project Gigabit) will deliver subsidised gigabit-capable broadband to hard to reach areas of the UK that would otherwise have been left behind by broadband network providers in their commercial rollout plans. There will be local, regional and cross-regional contracts available for broadband network providers of all sizes to bid for, managed through close working relationships with local authorities and the devolved administrations. This approach will be complemented by vouchers, hubs, gigabit-capable Superfast contracts and barrier busting measures to improve pace and flexibility of delivery.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber/red.This is primarily due to the following factors: This is the first GMPP submission for UK Gigabit programme and therefore it is not possible to include a change in DCA since the last report. The current DCA is 'Amber/Red', reflecting the risk of suppliers not being able to deliver at the pace required.","startDate":"2021-04-01","endDate":"2030-12-31","scheduleNarrative":"The project end-date is 31 December 2030. This is primarily due to the following factors: There is no deviation to the schedule.","fyBaseline":15.24,"fyForecast":14.1,"fyVariance":-7.0,"varianceNarrative":"The budget variance exceeds 5%. The variance in 20/21 is driven by changes to BDUK's target operating model which impacted on implementation, including changes to recruitment profiling during 2020/21. This also pushed back timescales and spend for implementing bespoke IT systems.","wholeLifeCost":5035.24,"costNarrative":"The projects Baseline Whole Life Cost is �5035.24m. This is primarily due to the following factors: This is the first GMPP for the UKGP, and the programme is not yet in delivery so we have recorded no capital spend on this programme yet. However forecasted costs from previous business cases have been used to illustrate the expected cost of this programme, the overall lifetime costs are expected to be �5bn.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber/red.This is primarily due to the following factors: This is the first GMPP submission for UK Gigabit programme and therefore it is not possible to include a change in DCA since the last report. The current DCA is 'Amber/Red', reflecting the risk of suppliers not being able…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project end-date is 31 December 2030. This is primarily due to the following factors: There is no deviation to the schedule.","narrativeClaimKind":null},{"id":"DCMS_0019_2021-Q4","year":2022,"name":"Project Gigabit","department":"DCMS","category":"Infrastructure and Construction","description":"The UK Gigabit Programme (Project Gigabit) will deliver subsidised gigabit-capable broadband to hard to reach areas of the UK that would otherwise have been left behind by broadband network providers in their commercial rollout plans. There will be local, regional and cross-regional contracts available for broadband network providers of all sizes to bid for, managed through close working relationships with local authorities and the devolved administrations. This approach will be complemented by vouchers, hubs, gigabit-capable Superfast contracts and barrier busting measures to improve pace and flexibility of delivery.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 decreased from Amber/red to Amber Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 improved from Amber/red to Amber. This improvement came as a result of the UK Gigabit Programme making progress against each of the IPA's Gateway 0 recommendations that were given to the Programme in September 2021. Notable areas of improvement included providing HMT with a better understanding of the Programme Business Case and rolling out an integrated resource plan for the Programme to help improve resource requirements and delivery forecasting. Some areas for further development include refining commercial strategy to account for changes to supplier landscape and in light of outcomes from stage 1 procurements.","startDate":"2021-04-01","endDate":"2030-12-31","scheduleNarrative":"Compared to 2021-Q4, your project end-date remained scheduled to finish on 31 DEC 2030 . This is primarily due to the following factors: There is no deviation to the schedule.","fyBaseline":138.0,"fyForecast":72.11,"fyVariance":-48.0,"varianceNarrative":"The budget variance exceeds 5%. Project Gigabit uses 4 delivery mechanisms to deliver gigabit speed broadband to the hardest to reach 20% in the UK. The delivery mechanisms include i) Gigabit Infrastructure Scheme (GIS) is by far the biggest element of the programme, Superfast Extension, Hubs and Vouchers. The demand products (Hubs and Vouchers) started in April 2021 while GIS has started with procurement which is currently ongoing. The overall expected lifetime costs are expected to be £5bn with £1.2bn allocated over the first 4 years of this programme. The budget allocated for 2021/22 totalled £120m, with a post supps budget of £78.6m. The 2021/22 outturn came to £57.2m which includes £9.15m of BCT (£4.5m SFE and £4.65m Hubs). PG lost £17.4m as part of the supplementary estimates. The main reason driving the underspend relates to a number of Hubs projects not proceeding as planned. We have also seen unexpected volatility with the vouchers forecast which has caused an underspend of £20.5m against the post supps budget. This was primarily caused by suppliers providing optimistic delivery forecasts.","wholeLifeCost":5035.0,"costNarrative":"Compared to 2021-Q4,the projects Baseline Whole Life Cost remained at 5035.24 (£m). This is primarily due to the following factors: Compared to 2021-Q4, the project's budgeted Whole Life Cost has been updated to 5002.00 (£m) following the outcome of a Treasury Approval Point in January 2022. The forecast has since reduced to £4,940.00 based on updated delivery plans. Changes to the target intervention area for Project Gigabit have emerged since budgets were agreed, requiring the timing of delivery and the overall cost per premise to be re-evaluated. The result of these changes has produced a forecast saving across the life of Project Gigabit.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 decreased from Amber/red to Amber Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 improved from Amber/red to Amber. This improvement came as a result of…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to 2021-Q4, your project end-date remained scheduled to finish on 31 DEC 2030 . This is primarily due to the following factors: There is no deviation to the schedule.","narrativeClaimKind":null},{"id":"DCMS_0019_2021-Q4","year":2023,"name":"Project Gigabit","department":"DSIT","category":"Infrastructure and Construction","description":"The UK Gigabit Programme (Project Gigabit) will deliver subsidised gigabit-capable broadband to hard to reach areas of the UK that would otherwise have been left behind by broadband network providers in their commercial rollout plans. There will be local, regional and cross-regional contracts available for broadband network providers of all sizes to bid for, managed through close working relationships with local authorities and the devolved administrations. This approach will be complemented by vouchers, hubs, gigabit-capable Superfast contracts and barrier busting measures to improve pace and flexibility of delivery.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. Project Gigabit has made good progress since the last IPA review, with the programme continuing to align to its time, cost and scope expectations, as set out in the business case. All recommendations from the previous gate 0 were acknowledged and actioned appropriately. Some areas for further improvement include seeking commercial support from the Cabinet Office to ensure that competition can be demonstrated for each procurement, and introducing a formal learning from experience regime to build on lessons learnt and pilot activity for the benefit of future Gigabit delivery activity.","startDate":"2021-04-01","endDate":"2030-12-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2030-12-31. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2030-12-31. This is primarily due to the following factors. There is no deviation to the schedule.","fyBaseline":198.1,"fyForecast":79.1,"fyVariance":-60.0,"varianceNarrative":"The budget variance exceeds 5%. The budget allocated for Project Gigabit (Capital) in 2022/23 totalled 164.3m, with a post supps budget of 48.5m. The 2022/23 outturn is currently forecasted to be 42.4m. The main reason driving the underspend, since the Supplementary Estimate position, relates to Vouchers, where the average value of a voucher was lower than expected with lower than expected claims, and Gigabit Infrastructure Subsidy (GIS) procurements and subsequent mobilisation taking longer than expected.","wholeLifeCost":5112.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 increased from 5035m. to 5112m. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 increased from 5035m. to 5112m. This is primarily due to the following factors. 8 (m) following the outcome of a Treasury Approval Point in January 2022. The forecast has since increased to 4,756.2 (m) based on updated delivery plans including the re-evaluation of assumptions including cost per premises and the timing of delivery. The result of these changes has still produced a forecast saving, with capital funding across the life of Project Gigabit being under 5bn.","benefits":13509.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 13509m. Benefits have changed due to the new benefits model and changes to the premises delivery profile for Project Gigabit products.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. Project Gigabit has…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2030-12-31. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2030-12-31. This is primarily due to the following factors. There is no deviation to the schedule.","narrativeClaimKind":null},{"id":"DCMS_0019_2021-Q4","year":2024,"name":"Project Gigabit","department":"DSIT","category":"Infrastructure and Construction","description":"The UK Gigabit Programme (Project Gigabit) will deliver subsidised gigabit-capable broadband to hard to reach areas of the UK that would otherwise have been left behind by broadband network providers in their commercial rollout plans. There will be local, regional and cross-regional contracts available for broadband network providers of all sizes to bid for, managed through close working relationships with local authorities and the devolved administrations. This approach will be complemented by vouchers, hubs, gigabit-capable Superfast contracts and barrier busting measures to improve pace and flexibility of delivery.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The Infrastructure and Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Amber, based on the most recent review undertaken in March 2024._x000D_ _x000D_ The review gave three recommendations. These were to develop a plan to complete remaining gigabit coverage, to develop the data strategy for both internal and external audiences, and to develop competencies for key team members including Local Delivery Leads and Contract Managers. Action is under way on each of these.","startDate":"2021-04-01","endDate":"2030-12-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2030-12-31. This is primarily due to the following factors. We expect all identified areas of the UK to be under a GIS contract or within the scope of a procurement by the end of 2024. This will be complemented by continued delivery through vouchers, including extension of vouchers to urban areas. The superfast programme will continue to deliver gigabit capable coverage until scheduled completion in 2028.","fyBaseline":423.3,"fyForecast":149.3,"fyVariance":-65.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. Budget/ forecast variance is high on Project Gigabit as on average there has been 63 days delay on estimated planned contract start dates on GIS. North Dorset & New Forest faced delays of greater than one month, as did Cumbria. Cumbria delivery was also cut in half for 2023/24 financial year. Cambridgeshire, Norfolk and Suffolk were all due to deliver premises, but none did in 2023/24","wholeLifeCost":5404.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 increased from 5112m. to 5404m. This is primarily due to the following factors. based on updated delivery plans including the re-evaluation of assumptions including cost per premises and the timing of delivery. The result of these changes has still produced a forecast saving, with capital funding across the life of Project Gigabit being under 5bn.","benefits":8202.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 2324-Q4 decreased from 13509m. to 8202m. The baseline benefits have decreased by about 5bn between Q4 2022/23 and Q4 2023/24. The number of premises fell by about 650,000 which explains the reduction in benefits. The benefits per premises are about the same between the two returns, so this is reassuring. The main reason for the reduction in premises will be changes in premises that are eligible for Project Gigabit, especially GIS.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The Infrastructure and Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Amber, based on the most recent review undertaken in March…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2030-12-31. This is primarily due to the following factors. We expect all identified areas of the UK to be under a GIS contract or within the scope of a procurement by the end of 2024. This will be complemented by continued delivery through vouchers, including extension of vouchers to urban areas. The superfast programme will continue to deliver gigabit capable coverage until scheduled completion in 2028.","narrativeClaimKind":null},{"id":"DCMS_0019_2021-Q4","year":2025,"name":"Project Gigabit","department":"DSIT","category":"Infrastructure and Construction","description":"Deliver gigabit capable broadband to at least 85% of premises by 2025 and achieve full coverage as soon as possible. The government is subsidising deployment of non-commercial premises through Project Gigabit, other than premises which are not affordable or do not represent value for money.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ UK Gigabit coverage reached 87.1% in March 2025, according to Thinkbroadband, meaning the key Project Gigabit Programme target of 85% coverage by the end of 2025 has been met. The programme is progressing largely to plan but there are some concerns over supplier access to finance and supply chain risks that may impact delivery.","startDate":"2021-04-01","endDate":"2030-12-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/12/2030. This is primarily due to the following factors The government’s target at Q4 2024/25 was for next-generation, gigabit broadband to be available to 85% of the UK by 2025 and nationwide by 2030.","fyBaseline":423.3,"fyForecast":149.3,"fyVariance":64.73,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The budget variance is a result of factors including the need for projects to re-plan to take account of changes in commercial coverage, and supplier delivery issues including highways access and wayleaves.","wholeLifeCost":5404.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 5404. This is primarily due to the following factors‚ Answer - There is no visibility to support the updated amounts submitted for year 2033 which should have remained in line with Q4 23/24 submission. This seems to be consistent with an error in submission as we are not expecting RDEL spend to drop between both submissions. We are however expecting RDEL spend to be updated once we have more clarity on the RDEL envelope approved following Spending Review discussions and therefore will be updated in future returns.","benefits":8202.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 8202. This is primarily due to the following factors‚ Baseline benefits have decreased from £8,202m (Q4 2023/24) to £5,434m (Q4 2024/25). This is mainly due to the change in counterfactual between these two quarters, which decreased counterfactual prems from about 967k to 550k prems. The counterfactual was originally the EECC counterfactual, which delivered prems up to 2037/38. However, the new counterfactual assumes Project Gigabit is cancelled at the end of 2025/26, which results in less counterfactual prems being delivered.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ UK Gigabit coverage reached 87.1% in March 2025, according to Thinkbroadband, meaning the key Project Gigabit Programme target of 85% coverage by the end of 2025 has…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/12/2030. This is primarily due to the following factors The government’s target at Q4 2024/25 was for next-generation, gigabit broadband to be available to 85% of the UK by 2025 and nationwide by 2030.","narrativeClaimKind":null},{"id":"DCMS_0019_2021-Q4","year":2026,"name":"Project Gigabit","department":"DSIT","category":"Infrastructure and Construction","description":"Project Gigabit provides gigabit-capable connectivity to homes and businesses that are not included in suppliers' commercial plans. The programme target is for next-generation gigabit broadband to be available nationwide by 2032.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at AMBER. UK Gigabit coverage reached 90.76% in June 2026, according to ThinkBroadband. The programme is progressing largely to plan but there are some concerns over supplier access to finance and supply chain risks which may impact delivery.","startDate":"2021-04-01","endDate":"2032-12-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 has been extended to 31/12/2032. This is to reflect a revised delivery timeline.","fyBaseline":686.07,"fyForecast":486.34,"fyVariance":29.11,"varianceNarrative":"The budget variance is a result of factors including the need for projects to re-plan to take account of changes in commercial coverage, and supplier delivery issues including highways access and wayleaves.","wholeLifeCost":5214.96,"costNarrative":"Compared to financial year 24/25-Q4 of £5,404m, the project’s departmentally agreed Whole Life Cost at 25/26-Q4 decreased to £4,831m. This is primarily due to the following factors, updated Open Market Review has fed into updated Central Delivery Forecast Model.","benefits":3967.67,"benefitsNarrative":"The baseline benefits have remained at £5,434m (between Q4 2024/24 and Q4 2025/26) as the same return has been reported during this period.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at AMBER. UK Gigabit coverage reached 90.76% in June 2026, according to ThinkBroadband. The programme is progressing largely to plan but there are some concerns over supplier access to finance and supply chain risks which may impact delivery.…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 has been extended to 31/12/2032. This is to reflect a revised delivery timeline.","narrativeClaimKind":null}],"previous":{"id":"DCMS_0019_2021-Q4","year":2025,"name":"Project Gigabit","department":"DSIT","category":"Infrastructure and Construction","description":"Deliver gigabit capable broadband to at least 85% of premises by 2025 and achieve full coverage as soon as possible. The government is subsidising deployment of non-commercial premises through Project Gigabit, other than premises which are not affordable or do not represent value for money.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ UK Gigabit coverage reached 87.1% in March 2025, according to Thinkbroadband, meaning the key Project Gigabit Programme target of 85% coverage by the end of 2025 has been met. The programme is progressing largely to plan but there are some concerns over supplier access to finance and supply chain risks that may impact delivery.","startDate":"2021-04-01","endDate":"2030-12-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/12/2030. This is primarily due to the following factors The government’s target at Q4 2024/25 was for next-generation, gigabit broadband to be available to 85% of the UK by 2025 and nationwide by 2030.","fyBaseline":423.3,"fyForecast":149.3,"fyVariance":64.73,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The budget variance is a result of factors including the need for projects to re-plan to take account of changes in commercial coverage, and supplier delivery issues including highways access and wayleaves.","wholeLifeCost":5404.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 5404. This is primarily due to the following factors‚ Answer - There is no visibility to support the updated amounts submitted for year 2033 which should have remained in line with Q4 23/24 submission. This seems to be consistent with an error in submission as we are not expecting RDEL spend to drop between both submissions. We are however expecting RDEL spend to be updated once we have more clarity on the RDEL envelope approved following Spending Review discussions and therefore will be updated in future returns.","benefits":8202.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 8202. This is primarily due to the following factors‚ Baseline benefits have decreased from £8,202m (Q4 2023/24) to £5,434m (Q4 2024/25). This is mainly due to the change in counterfactual between these two quarters, which decreased counterfactual prems from about 967k to 550k prems. The counterfactual was originally the EECC counterfactual, which delivered prems up to 2037/38. However, the new counterfactual assumes Project Gigabit is cancelled at the end of 2025/26, which results in less counterfactual prems being delivered.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ UK Gigabit coverage reached 87.1% in March 2025, according to Thinkbroadband, meaning the key Project Gigabit Programme target of 85% coverage by the end of 2025 has…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/12/2030. This is primarily due to the following factors The government’s target at Q4 2024/25 was for next-generation, gigabit broadband to be available to 85% of the UK by 2025 and nationwide by 2030.","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":731,"attentionScore":48,"attentionReasons":["Current published delivery confidence is Amber","Published end date moved 731 days later","In-year forecast variance is +29.1%"]},{"id":"HO_0228_2223-Q4","year":2026,"name":"ANTI-MONEY LAUNDERING AND ASSET RECOVERY (AMLAR)","department":"HO","category":"Government Transformation and Service Delivery","description":"The AMLAR Programme will uplift the law enforcement response to money laundering, by improving people capacity, skills capability and technology to increase the prevention, detection, and disruption of money laundering and the recovery of criminal assets. The AMLAR Programme contributes to HM Government (HMG) commitments, including those set out in Economic Crime Plan 2 , published in March 2023, a key outcome of which is to reduce money laundering and recover more criminal assets.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared with FY24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating decreased to AMBER in FY25/26 Q4. This is primarily due to two changes at portfolio level: • A 5% shortfall in Financial Crime officers in 25/26, resulting in two milestones moving into 26/27. The remaining officers will now be recruited across Q1–Q2 of 26/27. • A delay to the delivery of the new crypto storage solution, aligned to the end of the existing business as usual (BAU) storage contract. This adjusts the delivery milestone from June to December 2026. These changes do not impact programme cost, and forecast benefit reductions remain within programme tolerance levels. Throughout FY25/26, AMLAR enabled several major operations: • Operation Destabilise - (NCA-led international investigation) disrupting Russian money laundering networks linked to organised crime, drug trafficking and espionage. This led to 84 arrests and £20m seized. • Operation Hawksmoor - resulting in multiple arrests, the seizure of high value vehicles, £60,000 cash, and designer watches. • Operation Machinize - targeting high street crime, money laundering and modern slavery. Outcomes included closure of 10 shops, seizure of £40,000 cash, 200,000 cigarettes, 7,000 tobacco packs, 8,000 illegal vapes, and 2 vehicles. In FY25/26, the programme has delivered an additional £60m in criminal asset recovery, with an additional £290m restrained but not yet recovered, exceeding yearly benefit targets. It has also delivered 758 money laundering disruptions against a target of 404.","startDate":"2023-04-01","endDate":null,"scheduleNarrative":"Compared with FY24/25 Q4, the project end date has moved from 31/03/2026 to 30/09/2027. This change reflects a rebaseline of the programme to align with the decommissioning of the BAU Joint Asset Recovery Database (JARD). JARD decommissioning is a critical dependency for the delivery of the new Asset Recovery IT Service. Decommissioning is scheduled to complete by September 2027, which drives the extension of the programme timeline.","fyBaseline":39.23,"fyForecast":35.74,"fyVariance":8.89,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors: recruitment and milestone delays.","wholeLifeCost":368.47,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) decreased from last year's £414.2m to £401.7m. This is primarily due to the following factors: reduced FY 24/25 Economic Crime Levy receipts which impacted the programme’s ability to grow in line with original recruitment delivery plans. Civil Service headcount cap restrictions also impacted the national Crime Agencies ability to grow as planned, which resulted in the deferral of circa 70 resources to other delivery partner areas at a reduced cost per full time equivalent resource.","benefits":1097.24,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) increased from £1214.43m to £1215.46m. This is primarily due to the following factors: Further work was undertaken to refine benefit modelling, removing areas of optimism bias that was included in the original model to reflect uncertainties at the time. The outputs from the recruited Financial Investigators has also been refined resulting in increased asset recovery outputs.","themes":["Delivery & schedule","Cost & funding","Commercial & supply chain","Governance & assurance"],"evidenceExcerpt":"Compared with FY24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating decreased to AMBER in FY25/26 Q4. This is primarily due to two changes at portfolio level: • A 5% shortfall in Financial Crime officers in 25/26, resulting in two milestones moving into 26/27. The remaining officers will now be recruited across Q1–Q2 of 26/27. • A delay to…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared with FY24/25 Q4, the project end date has moved from 31/03/2026 to 30/09/2027. This change reflects a rebaseline of the programme to align with the decommissioning of the BAU Joint Asset Recovery Database (JARD). JARD decommissioning is a critical dependency for the delivery of the new Asset Recovery IT Service. Decommissioning is scheduled to complete by September 2027, which drives the extension of the programme timeline.","narrativeClaimKind":null,"history":[{"id":"HO_0228_2223-Q4","year":2024,"name":"Anti-Money Laundering and Asset Recovery (AMLAR)","department":"HO","category":"Government Transformation and Service Delivery","description":"Monetary gain sits at the heart of most criminality. To benefit, criminals need to launder their ill-gotten gains. Tackling money laundering requires a co-ordinated, cross system response in order to disrupt and dismantle criminal business models that cause significant harm to victims and undermines our democracy and economy. _x000D_ _x000D_ The AMLAR Programme builds on the Economic Crime Plan (HM Treasury and Home Office, 2019), Asset Recovery Action Plan (Home Office, 2019), and UK Anti-Corruption Strategy. It will deliver actions in Economic Crime Plan 2 (2023) to uplift strategic communications, intelligence and investigative capability and new technology, to improve the prevention, detection and disruption of money laundering and increase the recovery of criminal assets.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. The programme delivery confidence is rated at Amber due to a reduction in Economic Crime Levy receipts for FY24/25 and restrictions placed across the Civil Service headcount, affecting several partner organisations, which is likely to impact delivery milestones and benefit realisation timeframes, with some scope deferred to FY25/26. The programme is refining the benefits model in alignment with an InvestCo appearance in July 2024.","startDate":"2023-04-01","endDate":"2026-03-31","scheduleNarrative":"The project's end-date at 23/24-Q4 is 2026-03-31. This is primarily due to the following factors. Any impacts of Economic Crime Levy receipts provided by HMT for FY24/25 will be addressed in FY25/26. Project end-date is not expected to change.","fyBaseline":22.6,"fyForecast":20.0,"fyVariance":-12.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. Underspend across the programme is primarily due to challenges in recruitment within the first year in the delivery partners. Work is ongoing between Home Office and delivery partners to mitigate this risk going forward.","wholeLifeCost":429.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 23/24-Q4 is 429m. This is primarily due to the following factors. The Whole Life Cost of the programme has not changed and is fully funded by Economic Crime Levy receipts from HMT.","benefits":1099.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 1099m. The Programme will not start to deliver benefits until FY24/25.","themes":["Cost & funding","Delivery & schedule","Scope & requirements"],"evidenceExcerpt":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. The programme delivery confidence is rated at Amber due to a reduction in Economic Crime Levy receipts for FY24/25 and restrictions placed across the Civil Service headcount, affecting several partner organisations,…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 23/24-Q4 is 2026-03-31. This is primarily due to the following factors. Any impacts of Economic Crime Levy receipts provided by HMT for FY24/25 will be addressed in FY25/26. Project end-date is not expected to change.","narrativeClaimKind":null},{"id":"HO_0228_2223-Q4","year":2025,"name":"ANTI-MONEY LAUNDERING AND ASSET RECOVERY (AMLAR)","department":"HO","category":"Government Transformation and Service Delivery","description":"The AMLAR Programme will uplift the law enforcement response to money laundering, by improving people capacity, skills capability and technology to increase the prevention, detection, and disruption of money laundering and the recovery of criminal assets. The AMLAR Programme contributes to HM Government (HMG) commitments, including those set out in Economic Crime Plan 2 , published in March 2023, a key outcome of which is to reduce money laundering and recover more criminal assets.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors‚ Recruitment targets were met with 290 Financial Crime officers now in post. The programme exceeded benefit targets through the recovery of £60m in criminal assets, with a further £100m seized. The programme also enabled over 400 money laundering disruptions. AMLAR enabled Operation Destabilise, a major international investigation led by the National Crime Agency which disrupted Russian money laundering networks linked to organised crime, drug trafficking and espionage activities. This operation resulted in 84 arrests and over £20 million seized. AMLAR also enabled Operation Hawksmoor where several arrests were made, as well as high-value cars, £60,000 cash and designer watches were seized.","startDate":"2023-04-01","endDate":"2026-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2026. This is primarily due to the following factors‚ All milestones completed to time and quality. 3-year delivery cycle completes at the end of FY25/26, with an assumption that the programme will then transition into business as usual (BAU).","fyBaseline":26.6,"fyForecast":26.6,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%. The budget variance is less than or equal to 5%.","wholeLifeCost":414.2,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 429 to 414. This is primarily due to the following factors‚ Reduced Economic Crime Levy receipts for FY24/25. Allocations as per the Business Case have been confirmed by HMT for FY25/26.","benefits":1214.43,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 1099 to 1214. This is primarily due to the following factors‚ Further work was undertaken to refine benefit modelling with the programme now reporting benefits associated with the Economic Crime and Corporate Transparency Bill and the additional powers to recover cryptoassets, alongside benefits associated with training reform and cost/efficiency savings through the remediation of the Joint Asset Recovery Database (JARD).","themes":["Cost & funding","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors‚ Recruitment targets were met with 290 Financial Crime officers now in post. The programme exceeded benefit targets through the recovery of £60m in…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2026. This is primarily due to the following factors‚ All milestones completed to time and quality. 3-year delivery cycle completes at the end of FY25/26, with an assumption that the programme will then transition into business as usual (BAU).","narrativeClaimKind":null},{"id":"HO_0228_2223-Q4","year":2026,"name":"ANTI-MONEY LAUNDERING AND ASSET RECOVERY (AMLAR)","department":"HO","category":"Government Transformation and Service Delivery","description":"The AMLAR Programme will uplift the law enforcement response to money laundering, by improving people capacity, skills capability and technology to increase the prevention, detection, and disruption of money laundering and the recovery of criminal assets. The AMLAR Programme contributes to HM Government (HMG) commitments, including those set out in Economic Crime Plan 2 , published in March 2023, a key outcome of which is to reduce money laundering and recover more criminal assets.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared with FY24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating decreased to AMBER in FY25/26 Q4. This is primarily due to two changes at portfolio level: • A 5% shortfall in Financial Crime officers in 25/26, resulting in two milestones moving into 26/27. The remaining officers will now be recruited across Q1–Q2 of 26/27. • A delay to the delivery of the new crypto storage solution, aligned to the end of the existing business as usual (BAU) storage contract. This adjusts the delivery milestone from June to December 2026. These changes do not impact programme cost, and forecast benefit reductions remain within programme tolerance levels. Throughout FY25/26, AMLAR enabled several major operations: • Operation Destabilise - (NCA-led international investigation) disrupting Russian money laundering networks linked to organised crime, drug trafficking and espionage. This led to 84 arrests and £20m seized. • Operation Hawksmoor - resulting in multiple arrests, the seizure of high value vehicles, £60,000 cash, and designer watches. • Operation Machinize - targeting high street crime, money laundering and modern slavery. Outcomes included closure of 10 shops, seizure of £40,000 cash, 200,000 cigarettes, 7,000 tobacco packs, 8,000 illegal vapes, and 2 vehicles. In FY25/26, the programme has delivered an additional £60m in criminal asset recovery, with an additional £290m restrained but not yet recovered, exceeding yearly benefit targets. It has also delivered 758 money laundering disruptions against a target of 404.","startDate":"2023-04-01","endDate":null,"scheduleNarrative":"Compared with FY24/25 Q4, the project end date has moved from 31/03/2026 to 30/09/2027. This change reflects a rebaseline of the programme to align with the decommissioning of the BAU Joint Asset Recovery Database (JARD). JARD decommissioning is a critical dependency for the delivery of the new Asset Recovery IT Service. Decommissioning is scheduled to complete by September 2027, which drives the extension of the programme timeline.","fyBaseline":39.23,"fyForecast":35.74,"fyVariance":8.89,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors: recruitment and milestone delays.","wholeLifeCost":368.47,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) decreased from last year's £414.2m to £401.7m. This is primarily due to the following factors: reduced FY 24/25 Economic Crime Levy receipts which impacted the programme’s ability to grow in line with original recruitment delivery plans. Civil Service headcount cap restrictions also impacted the national Crime Agencies ability to grow as planned, which resulted in the deferral of circa 70 resources to other delivery partner areas at a reduced cost per full time equivalent resource.","benefits":1097.24,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) increased from £1214.43m to £1215.46m. This is primarily due to the following factors: Further work was undertaken to refine benefit modelling, removing areas of optimism bias that was included in the original model to reflect uncertainties at the time. The outputs from the recruited Financial Investigators has also been refined resulting in increased asset recovery outputs.","themes":["Delivery & schedule","Cost & funding","Commercial & supply chain","Governance & assurance"],"evidenceExcerpt":"Compared with FY24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating decreased to AMBER in FY25/26 Q4. This is primarily due to two changes at portfolio level: • A 5% shortfall in Financial Crime officers in 25/26, resulting in two milestones moving into 26/27. The remaining officers will now be recruited across Q1–Q2 of 26/27. • A delay to…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared with FY24/25 Q4, the project end date has moved from 31/03/2026 to 30/09/2027. This change reflects a rebaseline of the programme to align with the decommissioning of the BAU Joint Asset Recovery Database (JARD). JARD decommissioning is a critical dependency for the delivery of the new Asset Recovery IT Service. Decommissioning is scheduled to complete by September 2027, which drives the extension of the programme timeline.","narrativeClaimKind":null}],"previous":{"id":"HO_0228_2223-Q4","year":2025,"name":"ANTI-MONEY LAUNDERING AND ASSET RECOVERY (AMLAR)","department":"HO","category":"Government Transformation and Service Delivery","description":"The AMLAR Programme will uplift the law enforcement response to money laundering, by improving people capacity, skills capability and technology to increase the prevention, detection, and disruption of money laundering and the recovery of criminal assets. The AMLAR Programme contributes to HM Government (HMG) commitments, including those set out in Economic Crime Plan 2 , published in March 2023, a key outcome of which is to reduce money laundering and recover more criminal assets.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors‚ Recruitment targets were met with 290 Financial Crime officers now in post. The programme exceeded benefit targets through the recovery of £60m in criminal assets, with a further £100m seized. The programme also enabled over 400 money laundering disruptions. AMLAR enabled Operation Destabilise, a major international investigation led by the National Crime Agency which disrupted Russian money laundering networks linked to organised crime, drug trafficking and espionage activities. This operation resulted in 84 arrests and over £20 million seized. AMLAR also enabled Operation Hawksmoor where several arrests were made, as well as high-value cars, £60,000 cash and designer watches were seized.","startDate":"2023-04-01","endDate":"2026-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2026. This is primarily due to the following factors‚ All milestones completed to time and quality. 3-year delivery cycle completes at the end of FY25/26, with an assumption that the programme will then transition into business as usual (BAU).","fyBaseline":26.6,"fyForecast":26.6,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%. The budget variance is less than or equal to 5%.","wholeLifeCost":414.2,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 429 to 414. This is primarily due to the following factors‚ Reduced Economic Crime Levy receipts for FY24/25. Allocations as per the Business Case have been confirmed by HMT for FY25/26.","benefits":1214.43,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 1099 to 1214. This is primarily due to the following factors‚ Further work was undertaken to refine benefit modelling with the programme now reporting benefits associated with the Economic Crime and Corporate Transparency Bill and the additional powers to recover cryptoassets, alongside benefits associated with training reform and cost/efficiency savings through the remediation of the Joint Asset Recovery Database (JARD).","themes":["Cost & funding","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors‚ Recruitment targets were met with 290 Financial Crime officers now in post. The programme exceeded benefit targets through the recovery of £60m in…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2026. This is primarily due to the following factors‚ All milestones completed to time and quality. 3-year delivery cycle completes at the end of FY25/26, with an assumption that the programme will then transition into business as usual (BAU).","narrativeClaimKind":null},"ratingDelta":1,"transition":"Worsened","endDateDeltaDays":null,"attentionScore":46,"attentionReasons":["Current published delivery confidence is Amber","Published rating worsened from Green to Amber","In-year forecast variance is +8.9%"]},{"id":"MOD_0121_2021-Q4","year":2026,"name":"COLLECTIVE TRAINING TRANSFORMATION PROGRAMME","department":"MOD","category":"Military Capability","description":"The Collective Training Transformation Programme (CTTP) will deliver through a long-term, collaborative relationship with industry the the Army Collective Training System . It will give the Army greater flexibility to train when, where and how it needs in order to meet Defence outputs. Through improved access to data analytics and a more flexible blend of live, virtual, and constructive training thereby improving the training experience all levels.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors. 1. The fundamentals of the programme remain sound and the need is compelling. 2. The resourcing position has improved and the commercial competition has concluded with a Preferred Tenderer being declared. 3.The Full Business Case has been submitted and has been assured by NISTA with a positive assessment of delivery confidence. The programme remains on schedule for a June 2026 Contract Award.","startDate":"2018-08-12","endDate":"2040-06-10","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 increased from 31/03/2032 to 11/06/2041 . This is primarily due to the following factors. 1. This is primarily due to 15 year contract award intended for 11/06/2026 . Contract award has slipped by circa three months due to the delay in the release of the Defence Investment Plan (DIP). 2. However, confirmation of affordability and submission of the Full Business Case into the approvals process has been made. CTTP remains on track for a June 26 Contract Award.","fyBaseline":11.6,"fyForecast":8.9,"fyVariance":23.24,"varianceNarrative":"The budget variance is less than 5%.","wholeLifeCost":2083.25,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) increased from £2106.59m to £2676.32M to This is primarily due to the following factors 1. Whole Life Costs has been updated to reflect the Full Business Case final costings and contract duration.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Commercial & supply chain","Cost & funding","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors. 1. The fundamentals of the programme remain sound and the need is compelling. 2. The resourcing position has improved and the commercial competition has concluded with a Preferred…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 increased from 31/03/2032 to 11/06/2041 . This is primarily due to the following factors. 1. This is primarily due to 15 year contract award intended for 11/06/2026 . Contract award has slipped by circa three months due to the delay in the release of the Defence Investment Plan (DIP). 2. However, confirmation of affordability and submission of the Full Business Case into the approvals process has been made. CTTP remains on track for a June 26 Contract Award.","narrativeClaimKind":null,"history":[{"id":"MOD_0121_2021-Q4","year":2021,"name":"Collective Training Transformation Programme","department":"MOD","category":"Military Capability","description":"The Collective Training Transformation Programme seeks to transform both the management and delivery of training and the experience for those going through training.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber.This is primarily due to the following factors: While there is a clear, resourced and detailed schedule in place to develop a robust Outline Business Case by mid-2022, resourcing within the core Programme team and cost pressure against the 10 year funding profile still need to be addressed. Some improvement in the manning situation should be delivered within the next few months as new staff are recruited in, and in the meantime, contractor support is being used to address the key capability gaps. Shortfalls in the 10 year funding profile against the resourcing requirement will be raised to the Army Top Level Budget holder for consideration for relief within the next planning round.","startDate":"2018-10-12","endDate":"2032-01-01","scheduleNarrative":"The project end-date is 01 January 2032.","fyBaseline":5.95,"fyForecast":5.95,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":976.26,"costNarrative":"The projects Baseline Whole Life Cost is �976.26m. This is primarily due to the following factors: Financial Year 22/23 onwards forecast is based on the Collective Training Transformation Programme's Enterprise cost model V0.1. Profiles have not yet been categorised into Defence Expenditure Limits and are presented on a deterministic outcome only.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Workforce & capability","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber.This is primarily due to the following factors: While there is a clear, resourced and detailed schedule in place to develop a robust Outline Business Case by mid-2022, resourcing within the core Programme team and cost pressure against the 10 year funding profile still…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project end-date is 01 January 2032.","narrativeClaimKind":null},{"id":"MOD_0121_2021-Q4","year":2022,"name":"Collective Training Transformation Programme","department":"MOD","category":"Military Capability","description":"The Collective Training Transformation Programme seeks to transform both the management and delivery of training and the experience for those going through training.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber. This is primarily due to the following factors: Work on the Concept Phase has progressed according to plan with risk mitigation in place throughout the year.","startDate":"2018-10-12","endDate":"2032-01-01","scheduleNarrative":"Compared to 2021-Q4, the project end-date remained scheduled to finish on 01 January 2032.","fyBaseline":9.65,"fyForecast":9.65,"fyVariance":0.0,"varianceNarrative":"The budget variance is inferior or equal to 5%.","wholeLifeCost":655.0,"costNarrative":"Compared to 2021-Q4, the projects Baseline Whole Life Cost decreased from 860.61 (£m) to 654.53 (£m). This is primarily due to the following factors: Whole life costs have reduced compared to the previous year's figures as a result of three factors; re-profiling of delivery plans, greater maturity in cost estimates and delivery of some interim capabilities out with Collective Training Transformation Programme.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber. This is primarily due to the following factors: Work on the Concept Phase has progressed according to plan with risk mitigation in place throughout the year. Compared to 2021-Q4, the project end-date remained scheduled to…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to 2021-Q4, the project end-date remained scheduled to finish on 01 January 2032.","narrativeClaimKind":null},{"id":"MOD_0121_2021-Q4","year":2023,"name":"Collective Training Transformation Programme","department":"MOD","category":"Military Capability","description":"The Collective Training Transformation Programme will deliver the Future Collective Training System to transform collective training for the Army. Through a long-term, collaborative relationship with industry the Future Collective Training System will deliver increased training system flexibility to allow the Army to train when, where and how it needs in order to meet Defence outputs. Through improved access to data analytics and a more flexible blend of live, virtual, and constructive training, the Future Collective Training System will improve the training enterprise and experience for soldiers and commanders at all levels.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. Good progress has been made during the past 12 months including securing Outline Business Case approval.There are however still many uncertainties and risks between now and Full Business Case. Furthermore, approvals are only given at 50% confidence and so prudence in overall Delivery Confidence Assessment is appropriate.","startDate":"2018-10-12","endDate":"2040-03-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 increased from 2032-01-01 to 2040-03-31. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 increased from 01/01/2032 to 31/03/2040. This is primarily due to the following factor: The project end date has been taken to the end of the 15 year contract award period and not the 10 year planning cycle.","fyBaseline":8.95,"fyForecast":5.44,"fyVariance":-39.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors: Delays in letting support contracts and a delayed internal transfer of funding for staff.","wholeLifeCost":974.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 increased from 655m. to 974m. This is primarily due to the following factors. The Whole Life Cost has increased as the Project End date is now taken to the end of the 15 year contract award period and not the 10 year planning cycle. The underlying costs have remained stable.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This programme does not report cashable benefits. Its aim is to provision the armed forces with the equipment and / or infrastructure required.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. Good progress has been made during the past 12 months including securing Outline Business Case approval.There are however still many uncertainties and risks between…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 increased from 2032-01-01 to 2040-03-31. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 increased from 01/01/2032 to 31/03/2040. This is primarily due to the following factor: The project end date has been taken to the end of the 15 year contract award period and not the 10 year planning cycle.","narrativeClaimKind":null},{"id":"MOD_0121_2021-Q4","year":2024,"name":"Collective Training Transformation Programme","department":"MOD","category":"Military Capability","description":"The Collective Training Transformation Programme (CTTP) will deliver the Future Collective Training System (FCTS) to transform collective training for the Army. Through a long-term, collaborative relationship with industry the FCTS will deliver increased training system flexibility to allow the Army to train when, where and how it needs in order to meet Defence outputs. Through improved access to data analytics and a more flexible blend of live, virtual, and constructive training, the FCTS will improve the training enterprise and experience for soldiers and commanders at all levels.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Red. This is primarily due to the following factors. Chronic under-resourcing of the programme team and the impact of delays to the commercial process.","startDate":"2018-10-12","endDate":"2032-03-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the programme's end-date at 23/24-Q4 remained scheduled to finish on 2032-03-31.","fyBaseline":19.7,"fyForecast":9.87,"fyVariance":-49.898,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. Underspend due to delays in the build programme for some training infrastructure works which are being funded as pathfinders for CTTP. The delays will not affect the programme overall.","wholeLifeCost":1981.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 increased from 974m. to 1981m. This is primarily due to the following factors. Due to a change to the way the programme has reported in the past, the previous WLC provided was the 10 year cost profile. The current WLC is the true cost of the programme, hence the reported increase since last year's report.","benefits":0.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 0m.","themes":["Cost & funding","Workforce & capability","Commercial & supply chain","Delivery & schedule"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Red. This is primarily due to the following factors. Chronic under-resourcing of the programme team and the impact of delays to the commercial process. Compared to financial year 22/23-Q4, the programme's end-date at 23/24-Q4 remained scheduled to finish on…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":true,"narrativeExcerpt":"Compared to financial year 22/23-Q4, the programme's end-date at 23/24-Q4 remained scheduled to finish on 2032-03-31.","narrativeClaimKind":"says-unchanged"},{"id":"MOD_0121_2021-Q4","year":2025,"name":"COLLECTIVE TRAINING TRANSFORMATION PROGRAMME","department":"MoD","category":"Military Capability","description":"The Collective Training Transformation Programme (CTTP) will deliver the Future Collective Training System (FCTS) to transform collective training for the Army. Through a long-term, collaborative relationship with industry the FCTS will deliver increased training system flexibility to allow the Army to train when, where and how it needs in order to meet Defence outputs. Through improved access to data analytics and a more flexible blend of live, virtual, and constructive training, the FCTS will improve the training enterprise and experience for soldiers and commanders at all levels.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 increased from RED to AMBER. This is primarily due to the following factors. The fundamentals of the programme remain sound and the need is compelling. Workforce numbers have improved in the latter half of the year leading to increased confidence of being able to deliver to plan.","startDate":"2018-10-12","endDate":"2032-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2032. This is primarily due to the following factors. Compared to the financial year 23/24-Q4, the projects end-date at 24/25-Q4 remains sheduled to finish on 31-03-32.","fyBaseline":16.38,"fyForecast":16.38,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":2106.6,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 1981 to 2106. This is primarily due to the following factors. Compared to financial year 23/24-Q4, the programme's departmental-agreed forecast Whole Life Cost at 24/25-Q4 increased from £1980.679M to £ 2106.596M. This is primarily due to the following factor: initial cost estimates from Industry being higher than anticipated.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits","themes":["Cost & funding","Delivery & schedule","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 increased from RED to AMBER. This is primarily due to the following factors. The fundamentals of the programme remain sound and the need is compelling. Workforce numbers have improved in the latter half of the year leading to increased confidence of being able to…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2032. This is primarily due to the following factors. Compared to the financial year 23/24-Q4, the projects end-date at 24/25-Q4 remains sheduled to finish on 31-03-32.","narrativeClaimKind":null},{"id":"MOD_0121_2021-Q4","year":2026,"name":"COLLECTIVE TRAINING TRANSFORMATION PROGRAMME","department":"MOD","category":"Military Capability","description":"The Collective Training Transformation Programme (CTTP) will deliver through a long-term, collaborative relationship with industry the the Army Collective Training System . It will give the Army greater flexibility to train when, where and how it needs in order to meet Defence outputs. Through improved access to data analytics and a more flexible blend of live, virtual, and constructive training thereby improving the training experience all levels.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors. 1. The fundamentals of the programme remain sound and the need is compelling. 2. The resourcing position has improved and the commercial competition has concluded with a Preferred Tenderer being declared. 3.The Full Business Case has been submitted and has been assured by NISTA with a positive assessment of delivery confidence. The programme remains on schedule for a June 2026 Contract Award.","startDate":"2018-08-12","endDate":"2040-06-10","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 increased from 31/03/2032 to 11/06/2041 . This is primarily due to the following factors. 1. This is primarily due to 15 year contract award intended for 11/06/2026 . Contract award has slipped by circa three months due to the delay in the release of the Defence Investment Plan (DIP). 2. However, confirmation of affordability and submission of the Full Business Case into the approvals process has been made. CTTP remains on track for a June 26 Contract Award.","fyBaseline":11.6,"fyForecast":8.9,"fyVariance":23.24,"varianceNarrative":"The budget variance is less than 5%.","wholeLifeCost":2083.25,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) increased from £2106.59m to £2676.32M to This is primarily due to the following factors 1. Whole Life Costs has been updated to reflect the Full Business Case final costings and contract duration.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Commercial & supply chain","Cost & funding","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors. 1. The fundamentals of the programme remain sound and the need is compelling. 2. The resourcing position has improved and the commercial competition has concluded with a Preferred…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 increased from 31/03/2032 to 11/06/2041 . This is primarily due to the following factors. 1. This is primarily due to 15 year contract award intended for 11/06/2026 . Contract award has slipped by circa three months due to the delay in the release of the Defence Investment Plan (DIP). 2. However, confirmation of affordability and submission of the Full Business Case into the approvals process has been made. CTTP remains on track for a June 26 Contract Award.","narrativeClaimKind":null}],"previous":{"id":"MOD_0121_2021-Q4","year":2025,"name":"COLLECTIVE TRAINING TRANSFORMATION PROGRAMME","department":"MoD","category":"Military Capability","description":"The Collective Training Transformation Programme (CTTP) will deliver the Future Collective Training System (FCTS) to transform collective training for the Army. Through a long-term, collaborative relationship with industry the FCTS will deliver increased training system flexibility to allow the Army to train when, where and how it needs in order to meet Defence outputs. Through improved access to data analytics and a more flexible blend of live, virtual, and constructive training, the FCTS will improve the training enterprise and experience for soldiers and commanders at all levels.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 increased from RED to AMBER. This is primarily due to the following factors. The fundamentals of the programme remain sound and the need is compelling. Workforce numbers have improved in the latter half of the year leading to increased confidence of being able to deliver to plan.","startDate":"2018-10-12","endDate":"2032-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2032. This is primarily due to the following factors. Compared to the financial year 23/24-Q4, the projects end-date at 24/25-Q4 remains sheduled to finish on 31-03-32.","fyBaseline":16.38,"fyForecast":16.38,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":2106.6,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 1981 to 2106. This is primarily due to the following factors. Compared to financial year 23/24-Q4, the programme's departmental-agreed forecast Whole Life Cost at 24/25-Q4 increased from £1980.679M to £ 2106.596M. This is primarily due to the following factor: initial cost estimates from Industry being higher than anticipated.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits","themes":["Cost & funding","Delivery & schedule","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 increased from RED to AMBER. This is primarily due to the following factors. The fundamentals of the programme remain sound and the need is compelling. Workforce numbers have improved in the latter half of the year leading to increased confidence of being able to…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2032. This is primarily due to the following factors. Compared to the financial year 23/24-Q4, the projects end-date at 24/25-Q4 remains sheduled to finish on 31-03-32.","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":2993,"attentionScore":46,"attentionReasons":["Current published delivery confidence is Amber","Published end date moved 2,993 days later","In-year forecast variance is +23.2%"]},{"id":"HO_0373_2425-Q1","year":2026,"name":"Civil Registration Service Transformation (CReST)","department":"HO","category":"Government Transformation and Service Delivery","description":"The programme will enable improvements within the General Register Office (GRO) for England and Wales delivery of its statutory service obligations; the Home Office and the Government’s wider digital identity ambitions, and the provisions within new legislative instruments for the modernisation of services.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared with Q4 2024/25, the NISTA / SRO Delivery Confidence Assessment (DCA) rating for Q4 2025/26 remains Amber. This reflects a combination of continued delivery progress alongside ongoing risks and dependencies. There has been positive progress in the delivery of digital products and services, including strong uptake across Local Registration Services, with the Death Registration Service now live in all districts. However, delays relating to key digital infrastructure dependencies have impacted overall progress. Challenges with the quality of record transcription have required a reassessment of the Record Digitisation project’s scope and delivery approach. The Programme Board has agreed that this is an appropriate point to review requirements, with the intention of re-procuring within the next 12 months. This approach is expected to enable the programme to take advantage of emerging technologies, including artificial intelligence, to improve digitisation outcomes and value for money. As a result, timelines for record digitisation are expected to extend to accommodate this re-procurement activity. The Registration Legacy Infrastructure Transformation Project has continued to progress well, including the successful completion of a proof of concept to transition services onto a single site. This is expected to help alleviate estate-related pressures within the General Register Office (GRO), with the potential for this phase of the project to be delivered ahead of schedule.","startDate":null,"endDate":"2030-08-15","scheduleNarrative":"Compared with Q4 2024/25, the project’s end date at Q4 2025/26 remains unchanged at 29 March 2030. This reflects a broadly stable delivery trajectory, alongside evolving scope and external constraints. Development of new services continues at pace, with key connectivity-related risks having been addressed. A Programme Board decision has been taken not to extend the existing XBP scanning and transcription contract. As a result, a re-procurement exercise will be required, and the programme will reassess the approach to record digitisation to align with its longer-term ambitions. The programme continues to explore innovative approaches to deliver its objectives more effectively. Work is underway to inform business case development and delivery planning for 2026/27, with a focus on identifying clear implementation options that provide a robust basis for decision-making. These plans are being developed in close consideration of end user needs. Following direction at InvestCo in May 2024, the programme has incorporated the decommissioning of over 20 smaller legacy systems that were previously out of scope. A dedicated project—the Registration Legacy Infrastructure Transformation Project (Re-LiT)—was established to deliver this activity. Early progress has been positive, with initial objectives expected to be delivered ahead of schedule and within budget, contributing to the management of wider programme financial pressures.","fyBaseline":51.88,"fyForecast":39.24,"fyVariance":24.37,"varianceNarrative":"The budget variance exceeds 5%, reflecting a combination of delivery rephasing and funding constraints. Since approval of the Programme Business Case (PBC) in September, the programme is forecasting an in-year reduction of approximately 20%. This is partly driven by delays to the Registration Legacy Infrastructure Transformation Project (Re-LiT), resulting in an in-year reduction of around £2.86m. Further reductions of between £3m–£4m are forecast in 2025/26 for the Record Digitisation project. This reflects the need to re-plan delivery in the context of affordability constraints, including changes to the approach previously agreed with the supplier.","wholeLifeCost":326.85,"costNarrative":"During FY 2025/26, the CReST Programme’s cost position was realigned to the approved whole-life cost baseline of £348.05m, as set out in the Programme Business Case approved in September 2025. This baseline incorporates the costs associated with the development and operation of new digital services, contracted scanning and transcription activity, and core programme delivery. The updated cost profile reflects a matured delivery plan, including the timetable for required legislative changes to enable digital registration, the sequencing of Registration Legacy Infrastructure Transformation Project (Re‑LiT) decommissioning activity, constraints associated with the Southport estate transition, and the latest confirmed critical path. There has been no material cost growth driven by changes in scope during the year; movements in cost primarily reflect the re-profiling of expenditure and increased forecast maturity rather than any increase in the overall programme envelope. Enhanced financial oversight during the year has strengthened alignment between delivery plans and financial forecasts. This has reduced the level of forecast underfunding from 9% at Q2 to 3% by Q4. This improvement was primarily driven by a £3.65m reduction in the funding gap associated with Record Digitisation, alongside a £2.86m deferral of Re‑LiT costs following an assurance-led re-baselining exercise prior to full delivery commitment. Re‑LiT is also exploring opportunities to reduce cost pressures in FY 2026/27 by transitioning elements of delivery and support from programme-funded solutions to centrally funded enterprise services, reducing duplication and reliance on bespoke arrangements. Ongoing departmental discussions regarding potential reductions to Capital allocations over the period 2026/27 to 2028/29 present a risk to future affordability. While in-year cost control remains effective, the programme continues to carry a moderate affordability risk in the outer years, driven by delivery dependencies and funding uncertainty rather than forecast overspend against the approved baseline.","benefits":320.18,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at £367M. This is primarily due to the following factors. Operational efficiencies throughout the Home Office and Local Registration Services (LRS), totalling approx. £45M per annum upon full realisation. Increase will be realised revenue via a new full service to the public. Further saving to be made where some commercial contacts are no longer required due to digitisation.","themes":["Delivery & schedule","Cost & funding","Commercial & supply chain","Approvals & decisions"],"evidenceExcerpt":"Compared with Q4 2024/25, the NISTA / SRO Delivery Confidence Assessment (DCA) rating for Q4 2025/26 remains Amber. This reflects a combination of continued delivery progress alongside ongoing risks and dependencies. There has been positive progress in the delivery of digital products and services, including strong uptake across Local Registration Services,…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":true,"narrativeExcerpt":"Compared with Q4 2024/25, the project’s end date at Q4 2025/26 remains unchanged at 29 March 2030. This reflects a broadly stable delivery trajectory, alongside evolving scope and external constraints. Development of new services continues at pace, with key connectivity-related risks having been addressed. A Programme Board decision has been taken not to extend the existing XBP scanning and transcription contract. As a result, a re-procurement exercise will be required, and the programme will reassess the approach to record digitisation to align with its longer-term ambitions. The programme continues to explore innovative approaches to deliver its objectives more effectively. Work is underway to inform business case development and delivery planning for 2026/27, with a focus on identifying clear implementation options that provide a robust basis for decision-making. These plans are being developed in close consideration of end user needs. Following direction at InvestCo in May 2024, the programme has incorporated the decommissioning of over 20 smaller legacy systems that were previously out of scope. A dedicated project—the Registration Legacy Infrastructure Transformation Project (Re-LiT)—was established to deliver this activity. Early progress has been positive, with initial objectives expected to be delivered ahead of schedule and within budget, contributing to the management of wider programme financial pressures.","narrativeClaimKind":"date-mismatch","history":[{"id":"HO_0373_2425-Q1","year":2025,"name":"Civil Registration Service Transformation (CReST)","department":"HO","category":"Government Transformation and Service Delivery","description":"The programme will enable improvements within the General Register Office (GRO) for England and Wales’ delivery of its statutory service obligations; the Home Office and the Government’s wider digital identity ambitions, and the provisions within new legislative instruments for the modernisation of services.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER. This is due to‚ The AMBER rating is reflects the positive progress made to date, whilst also reflecting current challenges and changes needed to continue to drive further progress, pace and efficiency through programme delivery. The Programme team have a high degree of confidence that the programme is on track to deliver against its objectives by the current forecast closure date in 2030, which is a pressing deadline linked to Estates changes required in respect of the General Register Office (GRO) Estate, in line with the Home Office estates strategy. However, the amber rating reflects the critical dependencies on key enabling legislative change timelines, the level of complexity involved in replacing legacy infrastructure both pre and post-legislative change, current year financial pressures and the current business case and underpinning delivery plan pending formal Investment Committee approval; and the risks currently being managed in respect of those pressures and challenges.","startDate":"2024-04-26","endDate":"2030-03-29","scheduleNarrative":"The project's end-date at 24/25-Q4 is scheduled to be 29/03/2030. This is primarily due to the following factors‚ Civil registration is a core national function of any society which underpins basic identity and prevents abuse of deceased identities. In England and Wales, civil registration is supported by a multitude of ageing systems used by the General Register Office (GRO) & Local Registration Service (LRS) on behalf of the Registrar General for England and Wales. The age of the current civil registration services and systems continue to cause instability and risk outages that impact business continuity. The systems have been updated several times over the last two decades in response to changing circumstances and new legislation. In each year that passes, the risk of incidents and outages increases, and this poses a significant risk to the business and to government. Further, there is a heavy reliance on equipment that is no longer readily available from the commercial market, and GRO records stored on microfilm tapes are degrading beyond use. The current position is not sustainable. GRO for England and Wales is a Home Office (HO) responsibility; the HO must ensure the system of civil registration continues to function effectively and that GRO and the LRS can carry out their statutory functions. Therefore, this programme which started in April 2022 aims to replace the legacy business critical systems, digitise registration records, and provide digital life event registration options for users in the future as new legislation is laid. At InvestCo in May 24, the programme was directed to include decommissioning of more than 20 smaller legacy systems that had previously been out of scope. A dedicated project, Registration Legacy Infrastructure Transformation Project (Re-Lit), has been set up to take forward suitable options. In addition, an initiative to improve Home Office Estates sustainability has created a new timing pressure. This programme must now complete prior to the decommissioning of the Smedley Hydro site in Southport, where legacy systems servers and microfilms are housed. The site is to be decommissioned by March 2030, which is a fixed deadline.","fyBaseline":28.07,"fyForecast":28.66,"fyVariance":2.1,"varianceNarrative":"The budget variance is less than or equal to 5%. The in-year variance reflects a Full Year Actual of £21.22 million against a budget allocation of £19.77 million (this included 1.27m from Department of Health and Social Care (DHSC) and 4.2m from GDS) , resulting in an overspend of approximately 7.3%. However, the programme had formal Investment Committee (InvestCo) approval to spend up to £25.7 million in 2024/25, and the variance against the allocated budget was anticipated. The lower-than-approved spend was primarily due to the implementation of a rectification plan and a revised Statement of Work (SOW) for the scanning and transcription workstream, which reduced expenditure in this area. The overspend against the allocated budget was anticipated and was absorbed through wider savings identified within the Migration & Borders portfolio, ensuring that the programme remained within the overall approved funding envelope and did not pose a financial risk to the department.","wholeLifeCost":235.66,"costNarrative":"The project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) is 235. This is primarily due to the following factors‚ The baseline Whole Life Cost (WLC) of £235 million was established following the merger of two previously approved programmes – one focused on replacing core civil registration systems, and the other on scanning and transcribing historical records. The decision to combine them was made to streamline governance, improve delivery alignment, and maximise benefits realisation. This figure reflects a detailed reassessment of scope, delivery timelines, and resource requirements as part of the revised Programme Business Case. The WLC includes estimated costs for digital system development, scanning activities, and infrastructure replacement but excludes decommissioning costs, which are being considered separately. This figure excludes the cost of future decommissioning work, which is expected to be scoped and costed separately. The updated baseline was agreed during the department’s internal assurance process and supported by the Internal Quality Assurance (IQA) review that enabled the programme’s entry into the Government Major Projects Portfolio (GMPP) in 2024/25.","benefits":367.92,"benefitsNarrative":"The project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) is 367. This is primarily due to the following factors, Operational efficiencies throughout the HO and the LRS, totalling approx. £45M per annum upon full realisation. Increased will be realised revenue via a new full service to the public. Further saving to be made where some commercial contacts are no longer required due to digitisation.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER. This is due to‚ The AMBER rating is reflects the positive progress made to date, whilst also reflecting current challenges and changes needed to continue to drive further progress, pace and efficiency through programme delivery. The Programme team have a high…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 24/25-Q4 is scheduled to be 29/03/2030. This is primarily due to the following factors‚ Civil registration is a core national function of any society which underpins basic identity and prevents abuse of deceased identities. In England and Wales, civil registration is supported by a multitude of ageing systems used by the General Register Office (GRO) & Local Registration Service (LRS) on behalf of the Registrar General for England and Wales. The age of the current civil registration services and systems continue to cause instability and risk outages that impact business continuity. The systems have been updated several times over the last two decades in response to changing circumstances and new legislation. In each year that passes, the risk of incidents and outages increases, and this poses a significant risk to the business and to government. Further, there is a heavy reliance on equipment that is no longer readily available from the commercial market, and GRO records stored on microfilm tapes are degrading beyond use. The current position is not sustainable. GRO for England and Wales is a Home Office (HO) responsibility; the HO must ensure the system of civil registration continues to function effectively and that GRO and the LRS can carry out their statutory functions. Therefore, this programme which started in April 2022 aims to replace the legacy business critical systems, digitise registration records, and provide digital life event registration options for users in the future as new legislation is laid. At InvestCo in May 24, the programme was directed to include decommissioning of more than 20 smaller legacy systems that had previously been out of scope. A dedicated project, Registration Legacy Infrastructure Transformation Project (Re-Lit), has been set up to take forward suitable options. In addition, an initiative to improve Home Office Estates sustainability has created a new timing pressure. This programme must now complete prior to the decommissioning of the Smedley Hydro site in Southport, where legacy systems servers and microfilms are housed. The site is to be decommissioned by March 2030, which is a fixed deadline.","narrativeClaimKind":null},{"id":"HO_0373_2425-Q1","year":2026,"name":"Civil Registration Service Transformation (CReST)","department":"HO","category":"Government Transformation and Service Delivery","description":"The programme will enable improvements within the General Register Office (GRO) for England and Wales delivery of its statutory service obligations; the Home Office and the Government’s wider digital identity ambitions, and the provisions within new legislative instruments for the modernisation of services.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared with Q4 2024/25, the NISTA / SRO Delivery Confidence Assessment (DCA) rating for Q4 2025/26 remains Amber. This reflects a combination of continued delivery progress alongside ongoing risks and dependencies. There has been positive progress in the delivery of digital products and services, including strong uptake across Local Registration Services, with the Death Registration Service now live in all districts. However, delays relating to key digital infrastructure dependencies have impacted overall progress. Challenges with the quality of record transcription have required a reassessment of the Record Digitisation project’s scope and delivery approach. The Programme Board has agreed that this is an appropriate point to review requirements, with the intention of re-procuring within the next 12 months. This approach is expected to enable the programme to take advantage of emerging technologies, including artificial intelligence, to improve digitisation outcomes and value for money. As a result, timelines for record digitisation are expected to extend to accommodate this re-procurement activity. The Registration Legacy Infrastructure Transformation Project has continued to progress well, including the successful completion of a proof of concept to transition services onto a single site. This is expected to help alleviate estate-related pressures within the General Register Office (GRO), with the potential for this phase of the project to be delivered ahead of schedule.","startDate":null,"endDate":"2030-08-15","scheduleNarrative":"Compared with Q4 2024/25, the project’s end date at Q4 2025/26 remains unchanged at 29 March 2030. This reflects a broadly stable delivery trajectory, alongside evolving scope and external constraints. Development of new services continues at pace, with key connectivity-related risks having been addressed. A Programme Board decision has been taken not to extend the existing XBP scanning and transcription contract. As a result, a re-procurement exercise will be required, and the programme will reassess the approach to record digitisation to align with its longer-term ambitions. The programme continues to explore innovative approaches to deliver its objectives more effectively. Work is underway to inform business case development and delivery planning for 2026/27, with a focus on identifying clear implementation options that provide a robust basis for decision-making. These plans are being developed in close consideration of end user needs. Following direction at InvestCo in May 2024, the programme has incorporated the decommissioning of over 20 smaller legacy systems that were previously out of scope. A dedicated project—the Registration Legacy Infrastructure Transformation Project (Re-LiT)—was established to deliver this activity. Early progress has been positive, with initial objectives expected to be delivered ahead of schedule and within budget, contributing to the management of wider programme financial pressures.","fyBaseline":51.88,"fyForecast":39.24,"fyVariance":24.37,"varianceNarrative":"The budget variance exceeds 5%, reflecting a combination of delivery rephasing and funding constraints. Since approval of the Programme Business Case (PBC) in September, the programme is forecasting an in-year reduction of approximately 20%. This is partly driven by delays to the Registration Legacy Infrastructure Transformation Project (Re-LiT), resulting in an in-year reduction of around £2.86m. Further reductions of between £3m–£4m are forecast in 2025/26 for the Record Digitisation project. This reflects the need to re-plan delivery in the context of affordability constraints, including changes to the approach previously agreed with the supplier.","wholeLifeCost":326.85,"costNarrative":"During FY 2025/26, the CReST Programme’s cost position was realigned to the approved whole-life cost baseline of £348.05m, as set out in the Programme Business Case approved in September 2025. This baseline incorporates the costs associated with the development and operation of new digital services, contracted scanning and transcription activity, and core programme delivery. The updated cost profile reflects a matured delivery plan, including the timetable for required legislative changes to enable digital registration, the sequencing of Registration Legacy Infrastructure Transformation Project (Re‑LiT) decommissioning activity, constraints associated with the Southport estate transition, and the latest confirmed critical path. There has been no material cost growth driven by changes in scope during the year; movements in cost primarily reflect the re-profiling of expenditure and increased forecast maturity rather than any increase in the overall programme envelope. Enhanced financial oversight during the year has strengthened alignment between delivery plans and financial forecasts. This has reduced the level of forecast underfunding from 9% at Q2 to 3% by Q4. This improvement was primarily driven by a £3.65m reduction in the funding gap associated with Record Digitisation, alongside a £2.86m deferral of Re‑LiT costs following an assurance-led re-baselining exercise prior to full delivery commitment. Re‑LiT is also exploring opportunities to reduce cost pressures in FY 2026/27 by transitioning elements of delivery and support from programme-funded solutions to centrally funded enterprise services, reducing duplication and reliance on bespoke arrangements. Ongoing departmental discussions regarding potential reductions to Capital allocations over the period 2026/27 to 2028/29 present a risk to future affordability. While in-year cost control remains effective, the programme continues to carry a moderate affordability risk in the outer years, driven by delivery dependencies and funding uncertainty rather than forecast overspend against the approved baseline.","benefits":320.18,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at £367M. This is primarily due to the following factors. Operational efficiencies throughout the Home Office and Local Registration Services (LRS), totalling approx. £45M per annum upon full realisation. Increase will be realised revenue via a new full service to the public. Further saving to be made where some commercial contacts are no longer required due to digitisation.","themes":["Delivery & schedule","Cost & funding","Commercial & supply chain","Approvals & decisions"],"evidenceExcerpt":"Compared with Q4 2024/25, the NISTA / SRO Delivery Confidence Assessment (DCA) rating for Q4 2025/26 remains Amber. This reflects a combination of continued delivery progress alongside ongoing risks and dependencies. There has been positive progress in the delivery of digital products and services, including strong uptake across Local Registration Services,…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":true,"narrativeExcerpt":"Compared with Q4 2024/25, the project’s end date at Q4 2025/26 remains unchanged at 29 March 2030. This reflects a broadly stable delivery trajectory, alongside evolving scope and external constraints. Development of new services continues at pace, with key connectivity-related risks having been addressed. A Programme Board decision has been taken not to extend the existing XBP scanning and transcription contract. As a result, a re-procurement exercise will be required, and the programme will reassess the approach to record digitisation to align with its longer-term ambitions. The programme continues to explore innovative approaches to deliver its objectives more effectively. Work is underway to inform business case development and delivery planning for 2026/27, with a focus on identifying clear implementation options that provide a robust basis for decision-making. These plans are being developed in close consideration of end user needs. Following direction at InvestCo in May 2024, the programme has incorporated the decommissioning of over 20 smaller legacy systems that were previously out of scope. A dedicated project—the Registration Legacy Infrastructure Transformation Project (Re-LiT)—was established to deliver this activity. Early progress has been positive, with initial objectives expected to be delivered ahead of schedule and within budget, contributing to the management of wider programme financial pressures.","narrativeClaimKind":"date-mismatch"}],"previous":{"id":"HO_0373_2425-Q1","year":2025,"name":"Civil Registration Service Transformation (CReST)","department":"HO","category":"Government Transformation and Service Delivery","description":"The programme will enable improvements within the General Register Office (GRO) for England and Wales’ delivery of its statutory service obligations; the Home Office and the Government’s wider digital identity ambitions, and the provisions within new legislative instruments for the modernisation of services.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER. This is due to‚ The AMBER rating is reflects the positive progress made to date, whilst also reflecting current challenges and changes needed to continue to drive further progress, pace and efficiency through programme delivery. The Programme team have a high degree of confidence that the programme is on track to deliver against its objectives by the current forecast closure date in 2030, which is a pressing deadline linked to Estates changes required in respect of the General Register Office (GRO) Estate, in line with the Home Office estates strategy. However, the amber rating reflects the critical dependencies on key enabling legislative change timelines, the level of complexity involved in replacing legacy infrastructure both pre and post-legislative change, current year financial pressures and the current business case and underpinning delivery plan pending formal Investment Committee approval; and the risks currently being managed in respect of those pressures and challenges.","startDate":"2024-04-26","endDate":"2030-03-29","scheduleNarrative":"The project's end-date at 24/25-Q4 is scheduled to be 29/03/2030. This is primarily due to the following factors‚ Civil registration is a core national function of any society which underpins basic identity and prevents abuse of deceased identities. In England and Wales, civil registration is supported by a multitude of ageing systems used by the General Register Office (GRO) & Local Registration Service (LRS) on behalf of the Registrar General for England and Wales. The age of the current civil registration services and systems continue to cause instability and risk outages that impact business continuity. The systems have been updated several times over the last two decades in response to changing circumstances and new legislation. In each year that passes, the risk of incidents and outages increases, and this poses a significant risk to the business and to government. Further, there is a heavy reliance on equipment that is no longer readily available from the commercial market, and GRO records stored on microfilm tapes are degrading beyond use. The current position is not sustainable. GRO for England and Wales is a Home Office (HO) responsibility; the HO must ensure the system of civil registration continues to function effectively and that GRO and the LRS can carry out their statutory functions. Therefore, this programme which started in April 2022 aims to replace the legacy business critical systems, digitise registration records, and provide digital life event registration options for users in the future as new legislation is laid. At InvestCo in May 24, the programme was directed to include decommissioning of more than 20 smaller legacy systems that had previously been out of scope. A dedicated project, Registration Legacy Infrastructure Transformation Project (Re-Lit), has been set up to take forward suitable options. In addition, an initiative to improve Home Office Estates sustainability has created a new timing pressure. This programme must now complete prior to the decommissioning of the Smedley Hydro site in Southport, where legacy systems servers and microfilms are housed. The site is to be decommissioned by March 2030, which is a fixed deadline.","fyBaseline":28.07,"fyForecast":28.66,"fyVariance":2.1,"varianceNarrative":"The budget variance is less than or equal to 5%. The in-year variance reflects a Full Year Actual of £21.22 million against a budget allocation of £19.77 million (this included 1.27m from Department of Health and Social Care (DHSC) and 4.2m from GDS) , resulting in an overspend of approximately 7.3%. However, the programme had formal Investment Committee (InvestCo) approval to spend up to £25.7 million in 2024/25, and the variance against the allocated budget was anticipated. The lower-than-approved spend was primarily due to the implementation of a rectification plan and a revised Statement of Work (SOW) for the scanning and transcription workstream, which reduced expenditure in this area. The overspend against the allocated budget was anticipated and was absorbed through wider savings identified within the Migration & Borders portfolio, ensuring that the programme remained within the overall approved funding envelope and did not pose a financial risk to the department.","wholeLifeCost":235.66,"costNarrative":"The project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) is 235. This is primarily due to the following factors‚ The baseline Whole Life Cost (WLC) of £235 million was established following the merger of two previously approved programmes – one focused on replacing core civil registration systems, and the other on scanning and transcribing historical records. The decision to combine them was made to streamline governance, improve delivery alignment, and maximise benefits realisation. This figure reflects a detailed reassessment of scope, delivery timelines, and resource requirements as part of the revised Programme Business Case. The WLC includes estimated costs for digital system development, scanning activities, and infrastructure replacement but excludes decommissioning costs, which are being considered separately. This figure excludes the cost of future decommissioning work, which is expected to be scoped and costed separately. The updated baseline was agreed during the department’s internal assurance process and supported by the Internal Quality Assurance (IQA) review that enabled the programme’s entry into the Government Major Projects Portfolio (GMPP) in 2024/25.","benefits":367.92,"benefitsNarrative":"The project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) is 367. This is primarily due to the following factors, Operational efficiencies throughout the HO and the LRS, totalling approx. £45M per annum upon full realisation. Increased will be realised revenue via a new full service to the public. Further saving to be made where some commercial contacts are no longer required due to digitisation.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER. This is due to‚ The AMBER rating is reflects the positive progress made to date, whilst also reflecting current challenges and changes needed to continue to drive further progress, pace and efficiency through programme delivery. The Programme team have a high…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 24/25-Q4 is scheduled to be 29/03/2030. This is primarily due to the following factors‚ Civil registration is a core national function of any society which underpins basic identity and prevents abuse of deceased identities. In England and Wales, civil registration is supported by a multitude of ageing systems used by the General Register Office (GRO) & Local Registration Service (LRS) on behalf of the Registrar General for England and Wales. The age of the current civil registration services and systems continue to cause instability and risk outages that impact business continuity. The systems have been updated several times over the last two decades in response to changing circumstances and new legislation. In each year that passes, the risk of incidents and outages increases, and this poses a significant risk to the business and to government. Further, there is a heavy reliance on equipment that is no longer readily available from the commercial market, and GRO records stored on microfilm tapes are degrading beyond use. The current position is not sustainable. GRO for England and Wales is a Home Office (HO) responsibility; the HO must ensure the system of civil registration continues to function effectively and that GRO and the LRS can carry out their statutory functions. Therefore, this programme which started in April 2022 aims to replace the legacy business critical systems, digitise registration records, and provide digital life event registration options for users in the future as new legislation is laid. At InvestCo in May 24, the programme was directed to include decommissioning of more than 20 smaller legacy systems that had previously been out of scope. A dedicated project, Registration Legacy Infrastructure Transformation Project (Re-Lit), has been set up to take forward suitable options. In addition, an initiative to improve Home Office Estates sustainability has created a new timing pressure. This programme must now complete prior to the decommissioning of the Smedley Hydro site in Southport, where legacy systems servers and microfilms are housed. The site is to be decommissioned by March 2030, which is a fixed deadline.","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":139,"attentionScore":46,"attentionReasons":["Published commentary says the end date is unchanged while the published date moved","Current published delivery confidence is Amber","Published end date moved 139 days later","In-year forecast variance is +24.4%"]},{"id":"MOJ_0144_2223-Q2","year":2026,"name":"Small Secure Houseblocks","department":"MOJ","category":"Infrastructure and Construction","description":"The Small Secure Houseblock project supports our 20,000 additional prison places commitment; its scope is to create units that will provide secure, permanent accommodation within the closed estate. The project provides a new style of accommodation for deployment in existing prison sites. Small Secure Houseblock units meet the technical needs and security standards required for Category C prisons.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25-Q4, the NISTA Delivery Confidence Assessment (DCA) has increased from Red to Amber. This is primarily due to improved time confidence following receipt of post-construction mobilisation plans.","startDate":"2021-11-15","endDate":"2028-10-27","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end date at 25/26-Q4 changed from 16/12/27 to 27/10/28. This is primarily due to changes in project scope resulting in amendment of the project timeline.","fyBaseline":489.45,"fyForecast":341.51,"fyVariance":30.23,"varianceNarrative":"Compared to financial year 2024/25‑Q4, the in‑year forecast for 25/26 shows an underspend against the baseline. The underspend is due to reduce in-year activities, requiring costs to be re-profiled into future years.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"This project currently reports no monetised benefits. Due to the projected increasing prisons population, this project focusses on increasing capacity and there are no monetised benefits to be claimed. The project's other benefits are defined in the current baseline as: construction benefits and outcomes (capacity, modern methods of construction and sustainability); to enable an improvement in prisoner rehabilitation outcomes; and, during its construction, deliver local community benefits.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 24/25-Q4, the NISTA Delivery Confidence Assessment (DCA) has increased from Red to Amber. This is primarily due to improved time confidence following receipt of post-construction mobilisation plans. Compared to financial year 24/25-Q4, the project's end date at 25/26-Q4 changed from 16/12/27 to 27/10/28. This is primarily due to…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end date at 25/26-Q4 changed from 16/12/27 to 27/10/28. This is primarily due to changes in project scope resulting in amendment of the project timeline.","narrativeClaimKind":null,"history":[{"id":"MOJ_0144_2223-Q2","year":2023,"name":"Small Secure Houseblocks","department":"MOJ","category":"Infrastructure and Construction","description":"Small Secure Houseblock units will provide secure, permanent accommodation within the closed estate. The project provides a new style of accommodation for deployment in existing prison sites. Small Secure Houseblock units meet the technical needs and security standards required for Category C prisons.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 is Amber. This is primarily due to the following factors. This is thefirst timedata has been published for this project, which has been added to GMPP over the last year.The Amber assessment is due to inherent risk in the project's timelines. .","startDate":"2021-11-15","endDate":null,"scheduleNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","fyBaseline":13.3,"fyForecast":6.69,"fyVariance":-50.0,"varianceNarrative":"The underspend is due to procurement challenges","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This project currently reports no monetised benefits. Due to the projected increasing prisons population, this project focusses on increasing capacity and there are no monetised benefits to be claimed. The programme's other benefits are defined in the current baseline as: construction benefits and outcomes (capacity, modern methods of construction and sustainability); to enable an improvement in prisoner rehabilitation outcomes; and, during its construction, deliver local community benefits.","themes":["Commercial & supply chain","Delivery & schedule"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 is Amber. This is primarily due to the following factors. This is thefirst timedata has been published for this project, which has been added to GMPP over the last year.The Amber assessment is due to inherent risk in the project's timelines. . Exempt under Section 43 of…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","narrativeClaimKind":null},{"id":"MOJ_0144_2223-Q2","year":2024,"name":"Small Secure Houseblocks","department":"MOJ","category":"Infrastructure and Construction","description":"The Small Secure Houseblock project supports our 20,000 additional prison places commitment; its scope is to create units that will provide secure, permanent accommodation within the closed estate. The project provides a new style of accommodation for deployment in existing prison sites. Small Secure Houseblock units meet the technical needs and security standards required for Category C prisons.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. Challenging site conditions.","startDate":"2021-11-15","endDate":null,"scheduleNarrative":"Exempt under Section 22 of the Freedom of Information Act 2000 (Information intended for future publication)","fyBaseline":125.4,"fyForecast":22.08,"fyVariance":-82.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The underspend is due to schedule delays following complexities with delivering a first-generation design and challenging site conditions.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":0.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 0m. This project currently reports no monetised benefits. Due to the projected increasing prisons population, this project focusses on increasing capacity and there are no monetised benefits to be claimed. The programme's other benefits are defined in the current baseline as: construction benefits and outcomes (capacity, modern methods of construction and sustainability); to enable an improvement in prisoner rehabilitation outcomes; and, during its construction, deliver local community benefits.","themes":["Commercial & supply chain","Cost & funding","Delivery & schedule","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. Challenging site conditions. Exempt under Section 22 of the Freedom of Information Act 2000 (Information intended for future publication)","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 22 of the Freedom of Information Act 2000 (Information intended for future publication)","narrativeClaimKind":null},{"id":"MOJ_0144_2223-Q2","year":2025,"name":"Small Secure Houseblocks","department":"MoJ","category":"Infrastructure and Construction","description":"The Small Secure Houseblock project supports our 20,000 additional prison places commitment; its scope is to create units that will provide secure, permanent accommodation within the closed estate. The project provides a new style of accommodation for deployment in existing prison sites. Small Secure Houseblock units meet the technical needs and security standards required for Category C prisons.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 decreased from AMBER to RED. This is primarily due to the following factors‚ Challenges with construction costs affecting the deliverability of the programme that require further review.","startDate":"2021-11-15","endDate":"2027-12-16","scheduleNarrative":"The project's end-date at 24/25-Q4 is scheduled to be 16/12/2027. This is primarily due to the following factors‚ Delays as a result of changes to programme scope.","fyBaseline":146.86,"fyForecast":153.2,"fyVariance":4.32,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ This project currently reports no monetised benefits. Due to the projected increasing prisons population, this project focusses on increasing capacity and there are no monetised benefits to be claimed. The programme's other benefits are defined in the current baseline as: construction benefits and outcomes (capacity, modern methods of construction and sustainability); to enable an improvement in prisoner rehabilitation outcomes; and, during its construction, deliver local community benefits.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 decreased from AMBER to RED. This is primarily due to the following factors‚ Challenges with construction costs affecting the deliverability of the programme that require further review. The project's end-date at 24/25-Q4 is…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 24/25-Q4 is scheduled to be 16/12/2027. This is primarily due to the following factors‚ Delays as a result of changes to programme scope.","narrativeClaimKind":null},{"id":"MOJ_0144_2223-Q2","year":2026,"name":"Small Secure Houseblocks","department":"MOJ","category":"Infrastructure and Construction","description":"The Small Secure Houseblock project supports our 20,000 additional prison places commitment; its scope is to create units that will provide secure, permanent accommodation within the closed estate. The project provides a new style of accommodation for deployment in existing prison sites. Small Secure Houseblock units meet the technical needs and security standards required for Category C prisons.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25-Q4, the NISTA Delivery Confidence Assessment (DCA) has increased from Red to Amber. This is primarily due to improved time confidence following receipt of post-construction mobilisation plans.","startDate":"2021-11-15","endDate":"2028-10-27","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end date at 25/26-Q4 changed from 16/12/27 to 27/10/28. This is primarily due to changes in project scope resulting in amendment of the project timeline.","fyBaseline":489.45,"fyForecast":341.51,"fyVariance":30.23,"varianceNarrative":"Compared to financial year 2024/25‑Q4, the in‑year forecast for 25/26 shows an underspend against the baseline. The underspend is due to reduce in-year activities, requiring costs to be re-profiled into future years.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"This project currently reports no monetised benefits. Due to the projected increasing prisons population, this project focusses on increasing capacity and there are no monetised benefits to be claimed. The project's other benefits are defined in the current baseline as: construction benefits and outcomes (capacity, modern methods of construction and sustainability); to enable an improvement in prisoner rehabilitation outcomes; and, during its construction, deliver local community benefits.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 24/25-Q4, the NISTA Delivery Confidence Assessment (DCA) has increased from Red to Amber. This is primarily due to improved time confidence following receipt of post-construction mobilisation plans. Compared to financial year 24/25-Q4, the project's end date at 25/26-Q4 changed from 16/12/27 to 27/10/28. This is primarily due to…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end date at 25/26-Q4 changed from 16/12/27 to 27/10/28. This is primarily due to changes in project scope resulting in amendment of the project timeline.","narrativeClaimKind":null}],"previous":{"id":"MOJ_0144_2223-Q2","year":2025,"name":"Small Secure Houseblocks","department":"MoJ","category":"Infrastructure and Construction","description":"The Small Secure Houseblock project supports our 20,000 additional prison places commitment; its scope is to create units that will provide secure, permanent accommodation within the closed estate. The project provides a new style of accommodation for deployment in existing prison sites. Small Secure Houseblock units meet the technical needs and security standards required for Category C prisons.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 decreased from AMBER to RED. This is primarily due to the following factors‚ Challenges with construction costs affecting the deliverability of the programme that require further review.","startDate":"2021-11-15","endDate":"2027-12-16","scheduleNarrative":"The project's end-date at 24/25-Q4 is scheduled to be 16/12/2027. This is primarily due to the following factors‚ Delays as a result of changes to programme scope.","fyBaseline":146.86,"fyForecast":153.2,"fyVariance":4.32,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ This project currently reports no monetised benefits. Due to the projected increasing prisons population, this project focusses on increasing capacity and there are no monetised benefits to be claimed. The programme's other benefits are defined in the current baseline as: construction benefits and outcomes (capacity, modern methods of construction and sustainability); to enable an improvement in prisoner rehabilitation outcomes; and, during its construction, deliver local community benefits.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 decreased from AMBER to RED. This is primarily due to the following factors‚ Challenges with construction costs affecting the deliverability of the programme that require further review. The project's end-date at 24/25-Q4 is…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 24/25-Q4 is scheduled to be 16/12/2027. This is primarily due to the following factors‚ Delays as a result of changes to programme scope.","narrativeClaimKind":null},"ratingDelta":-1,"transition":"Improved","endDateDeltaDays":316,"attentionScore":46,"attentionReasons":["Current published delivery confidence is Amber","Published end date moved 316 days later","In-year forecast variance is +30.2%"]},{"id":"MOD_0479_2425-Q4","year":2026,"name":"FUTURE AIR DOMINANCE SYSTEM","department":"MOD","category":"Military Capability","description":"Future Air Dominance System (FADS) is the Royal Navy’s contribution to Integrated Air and Missile Defence and long-range precision strike, supporting the UK’s Integrated Force across all theatres, including Homeland Defence. Operating within its approved Concept Phase, FADS is being developed as a system-of-systems that integrates sensing, decision-making, and effect capability delivery across a mixed crewed and uncrewed force. Following the Strategic Defence Review, the programme has aligned to the Hybrid Navy vision, prioritising affordability, autonomy and early operational relevance. This includes advancing next-generation radar sensing, force-level command and control, and new approaches to uncrewed and distributed capability, supported by open digital architectures and close collaboration with industry and international partners.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"The Project's Delivery Confidence Assessment rating at 25/26-Q4 is Red. This is primarily due to the following factors. 1. Over the past year, the programme has evolved to align with updated strategic direction, including the Hybrid Navy concept, and has adjusted its approach to emphasise affordability, adaptability and early operational relevance. This transition has required a refresh of assumptions and a focus on building the evidence needed to inform future decisions. 2. At the same time, the programme continues to operate within its approved Concept Phase funding, with future scope and phasing dependent on wider Defence Investment Plan outcomes. As a result, the programme is prioritising experimentation, de-risking and collaboration with industry and partners to mature options ahead of future approvals. 3. Delivery Confidence therefore reflects the programme’s current emphasis on evidence generation and strategic alignment, rather than long term delivery.","startDate":"2022-01-03","endDate":"2045-08-03","scheduleNarrative":"The programme's end-date at 25/26-Q4 remains undetermined. This is primarily due to the following factors. 1. Over the past year, the FADS programme schedule has remained deliberately flexible as the programme continues to operate within its approved Concept Phase. During this period, activity has been focused on shaping future options, testing assumptions, and preparing the programme to respond to forthcoming strategic and investment decisions, rather than progressing against a fixed delivery endpoint. 2. As future scope and phasing will be determined through wider Defence planning processes, a definitive programme end date has not yet been established. In the interim, the schedule reflects an approach that prioritises readiness for decision making, including option development, engagement with partners, and the maturation of enabling activities required to support future approvals. 3. The current schedule position therefore reflects the programme’s role in informing next steps, rather than a change to an agreed end state timeline.","fyBaseline":28.77,"fyForecast":19.93,"fyVariance":30.71,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. 1. The re‑profiling of programme activity following the Hybrid Navy pivot. Planned work was deliberately paused or re‑sequenced resulting in lower in‑year committed expenditure. 2. A proportion of the planned spend has therefore been held as un-committed and will be reallocated to align with the revised scope and delivery approach.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"The project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Delivery & schedule","Cost & funding","Scope & requirements","Commercial & supply chain"],"evidenceExcerpt":"The Project's Delivery Confidence Assessment rating at 25/26-Q4 is Red. This is primarily due to the following factors. 1. Over the past year, the programme has evolved to align with updated strategic direction, including the Hybrid Navy concept, and has adjusted its approach to emphasise affordability, adaptability and early operational relevance. This…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The programme's end-date at 25/26-Q4 remains undetermined. This is primarily due to the following factors. 1. Over the past year, the FADS programme schedule has remained deliberately flexible as the programme continues to operate within its approved Concept Phase. During this period, activity has been focused on shaping future options, testing assumptions, and preparing the programme to respond to forthcoming strategic and investment decisions, rather than progressing against a fixed delivery endpoint. 2. As future scope and phasing will be determined through wider Defence planning processes, a definitive programme end date has not yet been established. In the interim, the schedule reflects an approach that prioritises readiness for decision making, including option development, engagement with partners, and the maturation of enabling activities required to support future approvals. 3. The current schedule position therefore reflects the programme’s role in informing next steps, rather than a change to an agreed end state timeline.","narrativeClaimKind":null,"history":[{"id":"MOD_0479_2425-Q4","year":2026,"name":"FUTURE AIR DOMINANCE SYSTEM","department":"MOD","category":"Military Capability","description":"Future Air Dominance System (FADS) is the Royal Navy’s contribution to Integrated Air and Missile Defence and long-range precision strike, supporting the UK’s Integrated Force across all theatres, including Homeland Defence. Operating within its approved Concept Phase, FADS is being developed as a system-of-systems that integrates sensing, decision-making, and effect capability delivery across a mixed crewed and uncrewed force. Following the Strategic Defence Review, the programme has aligned to the Hybrid Navy vision, prioritising affordability, autonomy and early operational relevance. This includes advancing next-generation radar sensing, force-level command and control, and new approaches to uncrewed and distributed capability, supported by open digital architectures and close collaboration with industry and international partners.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"The Project's Delivery Confidence Assessment rating at 25/26-Q4 is Red. This is primarily due to the following factors. 1. Over the past year, the programme has evolved to align with updated strategic direction, including the Hybrid Navy concept, and has adjusted its approach to emphasise affordability, adaptability and early operational relevance. This transition has required a refresh of assumptions and a focus on building the evidence needed to inform future decisions. 2. At the same time, the programme continues to operate within its approved Concept Phase funding, with future scope and phasing dependent on wider Defence Investment Plan outcomes. As a result, the programme is prioritising experimentation, de-risking and collaboration with industry and partners to mature options ahead of future approvals. 3. Delivery Confidence therefore reflects the programme’s current emphasis on evidence generation and strategic alignment, rather than long term delivery.","startDate":"2022-01-03","endDate":"2045-08-03","scheduleNarrative":"The programme's end-date at 25/26-Q4 remains undetermined. This is primarily due to the following factors. 1. Over the past year, the FADS programme schedule has remained deliberately flexible as the programme continues to operate within its approved Concept Phase. During this period, activity has been focused on shaping future options, testing assumptions, and preparing the programme to respond to forthcoming strategic and investment decisions, rather than progressing against a fixed delivery endpoint. 2. As future scope and phasing will be determined through wider Defence planning processes, a definitive programme end date has not yet been established. In the interim, the schedule reflects an approach that prioritises readiness for decision making, including option development, engagement with partners, and the maturation of enabling activities required to support future approvals. 3. The current schedule position therefore reflects the programme’s role in informing next steps, rather than a change to an agreed end state timeline.","fyBaseline":28.77,"fyForecast":19.93,"fyVariance":30.71,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. 1. The re‑profiling of programme activity following the Hybrid Navy pivot. Planned work was deliberately paused or re‑sequenced resulting in lower in‑year committed expenditure. 2. A proportion of the planned spend has therefore been held as un-committed and will be reallocated to align with the revised scope and delivery approach.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"The project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Delivery & schedule","Cost & funding","Scope & requirements","Commercial & supply chain"],"evidenceExcerpt":"The Project's Delivery Confidence Assessment rating at 25/26-Q4 is Red. This is primarily due to the following factors. 1. Over the past year, the programme has evolved to align with updated strategic direction, including the Hybrid Navy concept, and has adjusted its approach to emphasise affordability, adaptability and early operational relevance. This…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The programme's end-date at 25/26-Q4 remains undetermined. This is primarily due to the following factors. 1. Over the past year, the FADS programme schedule has remained deliberately flexible as the programme continues to operate within its approved Concept Phase. During this period, activity has been focused on shaping future options, testing assumptions, and preparing the programme to respond to forthcoming strategic and investment decisions, rather than progressing against a fixed delivery endpoint. 2. As future scope and phasing will be determined through wider Defence planning processes, a definitive programme end date has not yet been established. In the interim, the schedule reflects an approach that prioritises readiness for decision making, including option development, engagement with partners, and the maturation of enabling activities required to support future approvals. 3. The current schedule position therefore reflects the programme’s role in informing next steps, rather than a change to an agreed end state timeline.","narrativeClaimKind":null}],"previous":null,"ratingDelta":null,"transition":"Not comparable","endDateDeltaDays":null,"attentionScore":45,"attentionReasons":["Current published delivery confidence is Red","In-year forecast variance is +30.7%"]},{"id":"HO_0036_1617-Q2","year":2026,"name":"Law Enforcement Data Service","department":"HO","category":"Information and Communications Technology (ICT)","description":"The Law Enforcement Data Service (LEDS) is replacing the legacy Police National Computer (PNC) with a modern, secure and scalable data platform for policing and wider law enforcement agencies. LEDS is designed to provide continuity of core functionality while introducing enhanced capabilities, including image sharing, geo‑location data and automated alerts, enabling more effective access to and use of information across law enforcement. The PNC, which has been in operation for several decades, underpins critical policing activities, including arrests, traffic enforcement and safeguarding interventions. However, as an ageing system originally designed for an earlier technological environment, it is increasingly complex and costly to maintain and is less able to meet evolving operational and security requirements. LEDS provides a platform that supports more integrated, intelligence‑led policing and is designed to evolve over time in line with operational needs. By transitioning from legacy infrastructure to a modern data service, the programme aims to improve system resilience, data accessibility and the ability to respond effectively to emerging threats.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Amber delivery confidence assessment remains appropriate, reflecting continued progress in delivering the Law Enforcement Data Service (LEDS) and ongoing commitment to its modernisation objectives. While challenges remain, the programme is making measurable progress against its delivery plan, and successful delivery to agreed time and cost remains achievable in line with the approved business case.","startDate":"2014-04-01","endDate":"2026-12-31","scheduleNarrative":"The programme delivery schedule has been extended to enable Final Endpoint Switchover (FES) by September 2026 and programme closure by December 2026. This extension, along with the underpinning delivery milestones, was outlined in the updated programme business case, which was approved by InvestCo (Investment Committee) on 18 December 2025.","fyBaseline":218.33,"fyForecast":141.52,"fyVariance":35.18,"varianceNarrative":"The budget variance is less than or equal to 5 (4.6%) at the end of Q4, and remains within agreed tolerances. The reported 35% variance in the table reflects a comparison between the approved business case baseline (which includes Optimism Bias) and actual expenditure (which excludes Optimism Bias).","wholeLifeCost":1086.68,"costNarrative":"In year forecast of £146.11m vs a funding allocation of £139.71m represents a 4.6% increase/variance. This increase is due to bringing forward work identified in Persons, Vehicles and SRG for FY26/27 into FY25/26.","benefits":396.81,"benefitsNarrative":"Compared to financial year 24/25 Q4, the projects departmentally agreed benefits at 24/25 Q4 (measured in £m) decreased from £458.895m to £457.837m. This is primarily due to £1.06m of benefits moving from forecast benefit to realised.","themes":["Delivery & schedule","Cost & funding","Approvals & decisions","Technical & integration"],"evidenceExcerpt":"The Amber delivery confidence assessment remains appropriate, reflecting continued progress in delivering the Law Enforcement Data Service (LEDS) and ongoing commitment to its modernisation objectives. While challenges remain, the programme is making measurable progress against its delivery plan, and successful delivery to agreed time and cost remains…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The programme delivery schedule has been extended to enable Final Endpoint Switchover (FES) by September 2026 and programme closure by December 2026. This extension, along with the underpinning delivery milestones, was outlined in the updated programme business case, which was approved by InvestCo (Investment Committee) on 18 December 2025.","narrativeClaimKind":null,"history":[{"id":"HO_0036_1617-Q2","year":2020,"name":"National Law Enforcement Data Programme (NLEDP)","department":"HO","category":"ICT","description":"Will replace the current Police National Computer (PNC) and Police National Database (PND) systems with one modernised solution.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber/Red, which has not changed since last year�s Q2 1819 Amber/Red, due primarily to the following factors; - An independent review in January 2019 found significant progress since the last review, however, As in 2018, the long term funding position remains unclear and some smoothing was likely to be necessary in the shorter term too. - As at Q2 2019/20, there was a continued risk that police forces and Law Enforcement Agencies would not transition to LEDS (Law Enforcement Data System) in line with the programme plan. Since the Q2 1920 (30th September 2019) Amber/Red IPA DCA, the following non-project operating environment activities have impacted the original Q2 IPA DCA; - External dependencies with the Home Office operating environment are not ready for NLEDP to consume or onboard. The team has therefore determined to build all its own services, where necessary, to meet delivery timescales. - Availability of staff due to EU Exit activities and ability to gain the relevant security clearances has affected onboarding. In addition, dependencies on external live services resources to meet Programme timescales has affected milestone dates. Since the Q2 1920 (30th September 2019) Amber/Red IPA DCA, the following primary project actions have impacted the original Q2 IPA DCA; - The Programme achieved a confidence rating of Amber from an independent review that took place in November 2019. - The Programme has developed a staged transition approach for the introduction of the LEDS into operational use. It has been assessed as making more likely successful LEDS delivery by building stakeholder confidence through the delivery of incrementally enhanced services to Law Enforcement in a controlled way across targeted stakeholder groups. - The Programme has ensured that its procurement approach protects the Home Office should the future additional funding to deliver the PND (Police National Database) element not be secured.","startDate":"2014-04-01","endDate":"2023-03-31","scheduleNarrative":"The scheduled baseline project end date at Q2 1920 (30th September 2019) is 31/03/23, has lengthened by 1095 days since last year's Q2 1819 date of 31/03/20, due primarily to the following factors; - The 18/19 Programme forecast was unaffordable but also the technical complexity of the new platform meant the deadline would not have been achievable. The programme re-planned to derisk delivery, focusing first on PNC (Police National Computer) delivery and restricting expenditure to the existing Portfolio allocation, phasing delivery of PNC and PND replacement sequentially, not in parallel, as presented in the 2019 Business Case. - Increasingly detailed analysis of PNC and PND resulted in greater estimating certainty for the full requirements of the replacement system; Programme forecasted build costs increased. This precipitated the re-planning, and the longer time-frame. Since the Q2 1920 (30th September 2019) baseline project end date of 31/03/23, the following non-project operating environment activities have impacted the original Q2 baseline project end date; - External dependencies within the Home Office operating environment are not ready for NLEDP to consume or onboard to, due to maturity and prioritisation of critical Live Services over change programmes. Therefore the Programme is building all its own services, where necessary, to meet delivery timescales. - Availability of staff due to EU Exit activities and ability to gain the relevant security clearances has affected onboarding. In addition, dependencies on external live services resources to meet Programme timescales has affected milestone dates. Since the Q2 1920 (30th September 2019) baseline project end date of 31/03/23, the following primary project actions have impacted the original Q2 baseline project end date; - NLEDP has undergone a programme reset. In-depth planning work determined that the previous baseline was not feasible given the Programme�s complexity. Consequently, the Programme�s plan, business case, and cost model are being re-baselined ensuring affordability within the Portfolio's budget allocation. - NLEDP has moved from delivering PND and PNC replacement simultaneously to an incremental delivery approach, with phased transition for PNC, delivering early capabilities to controlled user groups and offering earlier benefits for specific stakeholders. This de-risks the programme and makes it more affordable, but stretches the project end date. - There is no change to the business scope, however, implementation scope will change in line with the phased transition plan.","fyBaseline":67.5,"fyForecast":87.43,"fyVariance":30.0,"varianceNarrative":"The 19/20 in-year baseline / forecast variance at Q2 1920 (30th September 2019) of 30%, is due primarily to the following factors; - The Q2 2019/20 figure reflects the in year position within 2019 Programme Business Case (PBC) which has been approved by the Home Office's investment committee, but is awaiting from HMT approval. The latest costs from that case are presented here with cost comparison were from the 2017 business case. There has been significant change in the Programme since then. - Additional items were part of Programme scope; security controls, Police Cloud Gateway, a new identity and access management solution, a solution to interface with older systems and specific requirements to handle more sensitive data and additional costs identified with data migration, external interfaces, test and the core Programme team's extension. - The 2019 PBC has made the Programme affordable year-on-year, with a longer delivery timeframe and increased costs. This forecast includes an additional year of run costs due to extension of appraisal period (2031/32), accommodating the delay to the start of the asset's life following replanning, giving an artificially higher total cost. Since the Q2 1920 (30th September 2019) 19/20 in-year baseline / forecast variance of 30%, the following primary project actions have impacted the original Q2 19/20 in-year variance; - Since Q2 re-baselining of the cost model was heavily focused around the Law Enforcement Portfolio's budget allocation for the Programme, as a result 2019/20 forecasts have reduced.","wholeLifeCost":469.4,"costNarrative":"The baseline Whole Life Cost at Q2 1920 (30th September 2019) is �469.40 m, has not changed since last year's Q2 1819 (�m) baseline Whole Life Cost of �469.40 m, due primarily to the following factors; - Both figures represent the baseline from the latest approved business case at that point in time. Since the Q2 1920 (30th September 2019) �469.40 m baseline Whole Life Cost, the following non-project operating environment activities have impacted the original baseline Q2 Whole Life Cost; - Additional programme activities originally planned to be provided by Home Office DDaT. Limited availability of civil servant resources, increased dependency on supplier resource. - Provision of all infrastructure and operating environments by the Programme. Since the Q2 1920 (30th September 2019) �469.40 m baseline Whole Life Cost, the following primary project actions have impacted the original Q2 baseline Whole Life Cost; - Programme WLC for 2019/20 PBC are �492.57 which is an increase over the figure reported. This is due to elongation of programme plan and increased build cost complexity. - Continued provision of all infrastructure and operating environments by the Programme.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Technical & integration"],"evidenceExcerpt":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber/Red, which has not changed since last year�s Q2 1819 Amber/Red, due primarily to the following factors; - An independent review in January 2019 found significant progress since the last review, however, As in 2018, the long term funding position remains unclear…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2020","sourceLabel":"IPA Annual Report 2019-20","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The scheduled baseline project end date at Q2 1920 (30th September 2019) is 31/03/23, has lengthened by 1095 days since last year's Q2 1819 date of 31/03/20, due primarily to the following factors; - The 18/19 Programme forecast was unaffordable but also the technical complexity of the new platform meant the deadline would not have been achievable. The programme re-planned to derisk delivery, focusing first on PNC (Police National Computer) delivery and restricting expenditure to the existing Portfolio allocation, phasing delivery of PNC and PND replacement sequentially, not in parallel, as presented in the 2019 Business Case. - Increasingly detailed analysis of PNC and PND resulted in greater estimating certainty for the full requirements of the replacement system; Programme forecasted build costs increased. This precipitated the re-planning, and the longer time-frame. Since the Q2 1920 (30th September 2019) baseline project end date of 31/03/23, the following non-project operating environment activities have impacted the original Q2 baseline project end date; - External dependencies within the Home Office operating environment are not ready for NLEDP to consume or onboard to, due to maturity and prioritisation of critical Live Services over change programmes. Therefore the Programme is building all its own services, where necessary, to meet delivery timescales. - Availability of staff due to EU Exit activities and ability to gain the relevant security clearances has affected onboarding. In addition, dependencies on external live services resources to meet Programme timescales has affected milestone dates. Since the Q2 1920 (30th September 2019) baseline project end date of 31/03/23, the following primary project actions have impacted the original Q2 baseline project end date; - NLEDP has undergone a programme reset. In-depth planning work determined that the previous baseline was not feasible given the Programme�s complexity. Consequently, the Programme�s plan, business case, and cost model are being re-baselined ensuring affordability within the Portfolio's budget allocation. - NLEDP has moved from delivering PND and PNC replacement simultaneously to an incremental delivery approach, with phased transition for PNC, delivering early capabilities to controlled user groups and offering earlier benefits for specific stakeholders. This de-risks the programme and makes it more affordable, but stretches the project end date. - There is no change to the business scope, however, implementation scope will change in line with the phased transition plan.","narrativeClaimKind":null},{"id":"HO_0036_1617-Q2","year":2021,"name":"National Law Enforcement Data Programme (NLEDP)","department":"HO","category":"ICT","description":"The National Law Enforcement Data Programme (NLEDP) is delivering an enhanced Law Enforcement Data Service (LEDS) that will be at the heart of protecting the public for years to come.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating increased from Amber/Red to Red. This is primarily due to the following factors: The programme went into a reset following the outcome of an independent review in December 2020 which laid out that the programme faced multiple challenges and constraints in the way it had been delivering, and that if it continued, the programme would not be able to deliver the LEDS capability that is urgently required by policing. The programme is coming out of reset at the end of July 2021. The three main risks to the programme are force engagement and adoption, the strategic platform decision, and the need to ensure two-way replication of data. To mitigate the risk of delayed delivery, the programme is considering options to ensure the continued operation of the current Police National Computer system beyond 2025.","startDate":"2014-04-01","endDate":"2023-03-31","scheduleNarrative":"Compared to financial year 19/20-Q2, the project's end-date remained scheduled to finish on 31 March 2023 . This is primarily due to the following factors: The programme is currently undergoing a reset and a revised programme end date will be agreed once this process has been concluded. The current focus is on delivering the property product as a proof of concept for subsequent products delivery.","fyBaseline":86.55,"fyForecast":75.02,"fyVariance":-13.0,"varianceNarrative":"The budget variance exceeds 5%. The presented baseline is from the approved 2019 business case and there has been significant change in the Programme since then. During the reset headcount on the programme has been reduced to ensure value for money and mitigate any nugatory costs. As a result the 2020/21 costs have reduced.","wholeLifeCost":631.09,"costNarrative":"Compared to financial year 19/20-Q2, the projects Baseline Whole Life Cost increased from �469.40m to �631.09m. This is primarily due to the following factors: Programme Whole Life Costs will be updated as part of the programme reset.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Scope & requirements","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating increased from Amber/Red to Red. This is primarily due to the following factors: The programme went into a reset following the outcome of an independent review in December 2020 which laid out that the programme faced multiple challenges and…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 19/20-Q2, the project's end-date remained scheduled to finish on 31 March 2023 . This is primarily due to the following factors: The programme is currently undergoing a reset and a revised programme end date will be agreed once this process has been concluded. The current focus is on delivering the property product as a proof of concept for subsequent products delivery.","narrativeClaimKind":null},{"id":"HO_0036_1617-Q2","year":2022,"name":"National Law Enforcement Data Programme (NLEDP)","department":"HO","category":"ICT","description":"The National Law Enforcement Data Programme (NLEDP) is delivering an enhanced Law Enforcement Data Service that will be at the heart of protecting the public for years to come, aiming to replace the current Police National Computer in advance of December 2025.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 decreased from Red to Amber. Programme has made significant progress in building stakeholder confidence and ramping up delivery velocity during the pathfinder phase. Main risks to the programme now is driving forces adoption of Law Enforcement Data Service products and building the production instance of the 2-way replication capability enabling both Police National Computer and NLEDP platforms to operate in parallel during NLEDP delivery and adoption phases. The programme continues to focus on proactively managing these risks. Photos at the Roadside Service successfully delivered to 32 police forces. The programme is on schedule to deliver next product iterations: Property, Drivers and supporting Audit functionality by March 2022. Vehicles Team are currently delivering Discovery phase. Recruitment for the Person product acceleration is underway. This team is currently delivering Alpha for the Wanted Persons Product and is building the 2-way replication production service. 2-way replication is a pre-requisite for the Vehicle and Person teams.","startDate":"2014-04-01","endDate":"2025-12-31","scheduleNarrative":"Compared to 2021-Q4, your project end-date increased from 31 MAR 2023 to 31 DEC 2025 . This is primarily due to the following factors: The programme has completed reset and the revised end date of the 31/12/2025 was agreed as part of the business case approved in July 2021 in order to complete the required delivery and adoption activities to replace the Police National Computer before the end-of-life of December 2025. NLEDP has moved to a product-centric approach with continuous, user-centred product delivery, a proven approach to de-risk a complex critical national infrastructure programme. The programme has successfully delivered the Property Search, Driver Check and associated Audit capabilities and has proven the 2-Way Replication Capability as committed on 31st March 2022.","fyBaseline":33.98,"fyForecast":33.98,"fyVariance":0.0,"varianceNarrative":"The budget variance is inferior or equal to 5%.","wholeLifeCost":736.0,"costNarrative":"Compared to2021-Q4, the projects Baseline Whole Life Cost increased from 631.09 (£m) to 735.58 (£m). This is primarily due to the following factors: The figures presented are from the latest business case which received Finance and Investment Committee approval in February 2022. The previous business case (2019) was approved prior to the December 2020 reset. That business case fundamentally differed in that it looked at the sequential replacement of both the Police National Computer and then the Police National Database, with a funding requirement of circa £155M, and is based on a waterfall delivery approach. The recent National Audit Office report assisted in demonstrating that this 2019 business case was not realistic in its understanding of the cost requirements or of the optimism bias percentage that was used (with the programme vastly understating its risk and uncertainty in cost/percentage terms). The latest business case adopts an agile approach to delivery and is solely focused on the replacement of the Police National Computer capabilities. The current business case made a funding request for circa £207M with an optimism bias allocation of £154M.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 decreased from Red to Amber. Programme has made significant progress in building stakeholder confidence and ramping up delivery velocity during the pathfinder phase. Main risks to the programme now is driving forces adoption of Law…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to 2021-Q4, your project end-date increased from 31 MAR 2023 to 31 DEC 2025 . This is primarily due to the following factors: The programme has completed reset and the revised end date of the 31/12/2025 was agreed as part of the business case approved in July 2021 in order to complete the required delivery and adoption activities to replace the Police National Computer before the end-of-life of December 2025. NLEDP has moved to a product-centric approach with continuous, user-centred product delivery, a proven approach to de-risk a complex critical national infrastructure programme. The programme has successfully delivered the Property Search, Driver Check and associated Audit capabilities and has proven the 2-Way Replication Capability as committed on 31st March 2022.","narrativeClaimKind":null},{"id":"HO_0036_1617-Q2","year":2023,"name":"National Law Enforcement Data Programme (NLEDP)","department":"HO","category":"ICT","description":"With the expansion of the National Law Enforcement Data Portfolio (NLEDP) we are now known as the Law Enforcement Data Service (LEDS) programme. The LEDS Programme is delivering a replacement to the current Police National Computer (PNC) service which will facilitate a range of future transformational capability and functionality that will be at the heart of protecting the public for years to come, aiming to replace the current PNC to enable retirement on PNC by March 2026.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. The programme leadership is strengthened by the appointment of a permanent, highly experienced Programme Director and new Senior Responsible Owner who brings a wealth of experience from a Policing background. The programme remains large and complex with areas of significant risk which are closely managed and monitored.Stakeholder relationships between Policing and the programme are very strong, with evidence of effective integrated joint working and ownership at the Force level. Adoption is well advanced with five key products rolled out and others in development.There is confidence that the programme is now in a position to successfully deliver a PNC equivalence, or better, by March 2026. It is appropriate that the programme now starts to focus on the complex choreography of moving away from PNC and, in parallel, work up the full transformation vision for a law enforcement data capability that will service a vast array of customers.","startDate":"2014-04-01","endDate":"2025-12-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2025-12-31. This is primarily due to the following factors. The programme has completed reset, the revised end date of the 31/12/2025 was agreed as part of the business case approved in July 2021 to complete the required delivery and adoption activities to replace PNC before it ceases to operate on 01/04/2026. LEDS has moved to a product-centric delivery approach with continuous, user-centred product delivery, a proven approach to de-risk a complex critical national infrastructure programme.The programme successfully released Photos at the Road Side(P@RS), Property, Drivers, Vehicles products to users underpinned by Audit capability all via the strategic Law Enforcement Cloud Platform(LECP). Property will be fully transitioned from PNC later this year with Drivers and Vehicles searches reaching Public Beta around the same time. 2-Way Replication has been demonstrated successfully but needs to be coupled with a LEDS product functionality to give more confidence in its capability, anticipated to be in place through Wanted Person capability later this year.","fyBaseline":63.74,"fyForecast":55.39,"fyVariance":-13.0,"varianceNarrative":"The budget variance exceeds 5%. The variance (c8.5million) arose due to 3 main factors. 1. The Programme received a VAT 'credit' against the accruals for prior Financial Years of c3million. 2. Procedural issues arose with regards to certain elements of the forecasted Adoption Grant; this resulted in a c3.5million underspend. 3. Whilst the programme resources have increased considerably (from 139 Fixed Term Employees last report to 293 Fixed Term Employees this report) the projection was for a slightly higher number of resources to be on the Programme by end of year, due to delays in onboarding. This reduction in resources cause a c2million underspend.","wholeLifeCost":602.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 decreased from 736m. to 602m. This is primarily due to the following factors. The Baseline Whole Life Cost (WLC) in the previous report (c736million) was based on the Programme pre-reset; this pre-reset WLC was also far greater than the forecast in the previous report (based on actuals and future forecast) of c589million. This report has updated the baseline from the pre-reset to the post-reset baseline hence the reduction. When we compare the forecast in the previous report (c589million) to the current forecast (c602million) there is a c13million increase which is due to the Programme having a greater understanding of the requirements (against assumptions) and certain roles which were not in the previous report (e.g. enhanced Security and Engineering & Architecture teams) which has resulted in the increase.","benefits":523.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 523m. The project's departmental-agree monetised benefits at 22/23-Q4 is 523m. The total benefits baseline has increased from 520.96 (million) to 523.35 (million). This is because of an improved forecasting methodology which has led to reapportionment of benefits. This has meant that there has been an increase in Government non cash-releasing benefits and wider UK public benefits as well as a decrease in government cash releasing benefits and the introduction of dis-benefits. The dis-benefits arise from officers needing to be trained to use both the old and the new system while both systems are being dual run.","themes":["Cost & funding","Delivery & schedule","Scope & requirements","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. The programme leadership is strengthened by the appointment of a permanent, highly experienced Programme Director and new Senior Responsible Owner who brings a wealth…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2025-12-31. This is primarily due to the following factors. The programme has completed reset, the revised end date of the 31/12/2025 was agreed as part of the business case approved in July 2021 to complete the required delivery and adoption activities to replace PNC before it ceases to operate on 01/04/2026. LEDS has moved to a product-centric delivery approach with continuous, user-centred product delivery, a proven approach to de-risk a complex critical national infrastructure programme.The programme successfully released Photos at the Road Side(P@RS), Property, Drivers, Vehicles products to users underpinned by Audit capability all via the strategic Law Enforcement Cloud Platform(LECP). Property will be fully transitioned from PNC later this year with Drivers and Vehicles searches reaching Public Beta around the same time. 2-Way Replication has been demonstrated successfully but needs to be coupled with a LEDS product functionality to give more confidence in its capability, anticipated to be in place through Wanted Person capability later this year.","narrativeClaimKind":null},{"id":"HO_0036_1617-Q2","year":2024,"name":"Law Enforcement Data Service","department":"HO","category":"ICT","description":"The Law Enforcement Data Service (LEDS) Programme is delivering a replacement to the current Police National Computer (PNC) service, which will facilliate a range of future transforamtion capability and functionality that will be at the heart of protecting the public for years to come, to enable retirement of PNC by March 2026.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. Delivery confidence based upon the continued positive progress towards product development and adoption since the last IPA Review remains high. PNC parity has been achieved for LEDS Property, Drivers and Vehicles Enquiry products, and development of the LEDS Person product has commenced. All five LEDS products are now live across 56 forces._x000D_ However, conclusion of LEDS development and adoption to enable retirement of PNC by March 26 remains challenging. LEDS continues to manage significant risk and dependencies owing to:_x000D_ 1. Complexity in development: multi-system integration across Police Forces, other LEDS consumers and data providers; new cloud platform hosting capabilities and migration from legacy technology._x000D_ 2. A broad, varied and demanding stakeholder community of 56 forces and 140 non-policing organisations_x000D_ 3. Growing financial and resourcing pressures_x000D_ These risks and dependencies are transparent and well-managed, with appropriate remediation plans and management attention. With these interventions, delivery within budget and time remains feasible.","startDate":"2014-04-01","endDate":"2026-03-31","scheduleNarrative":"The project's end-date at 23/24-Q4 is 2026-03-31. This is primarily due to the following factors. Programme is on track to close March 2026.","fyBaseline":85.03,"fyForecast":85.33,"fyVariance":0.0,"varianceNarrative":"The budget variance is inferior or equal to 5%.","wholeLifeCost":611.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 23/24-Q4 is 611m. This is primarily due to the following factors. There has only been minor movements of the Baseline Whole Life Cost from 2223-Q4 which is primarily due to: Increase in resource requirements forecast over the remaining programme timeframe, and the discovery work ongoing for the Person and External Integration areas, which is large and complex.","benefits":411.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 411m. Person Product Team contributes 72% of the benefits (320 m). The remaining benefits are derived from Driver's Product Team (3 m), Property Product Team (0.6 m), Vehicle Product Team (15 m), User Channels Product Team (9 m), Training Product Team (58 m) and Cross Product Team (10 m). Benefits from Audit Product Team and NSS Tools Product Team have not been monetised at this current stage","themes":["Cost & funding","Technical & integration","Delivery & schedule","Workforce & capability"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. Delivery confidence based upon the continued positive progress towards product development and adoption since the last IPA Review remains high. PNC parity has been achieved for LEDS Property, Drivers and Vehicles…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":true,"narrativeExcerpt":"The project's end-date at 23/24-Q4 is 2026-03-31. This is primarily due to the following factors. Programme is on track to close March 2026.","narrativeClaimKind":"says-unchanged"},{"id":"HO_0036_1617-Q2","year":2025,"name":"Law Enforcement Data Service","department":"HO","category":"ICT","description":"Law Enforcement Data Service (LEDS) Programme is a mature enabling programme, and a product-centric initiative that is replacing the end-of-life Police National Computer (PNC) with a modern, secure, and scalable platform. LEDS is critical national infrastructure that directly supports frontline policing and wider government priorities. LEDS is providing modern products, which can evolve over time to better meet the operational needs of law enforcement, as well as strong links, supporting Government priorities, including crime reduction, Violence against Women and Girls, and Serious Organised Crime (SOC). LEDS programme will incrementally deliver products that provide functional equivalence (parity) to PNC. It is delivering a suite of modern, cloud-based products that provide a unified view of law enforcement data, improve operational effectiveness, and enable future innovation. All products will be traced back to PNC data transactions to ensure parity with PNC is reached. Parity, in this context, means the minimum service required to support business continuity and ensure adoption, eventually allowing PNC to be retired. The programme is already delivering value through phased rollouts, with five products live across police forces and non-law enforcement agencies. The programme is on track to remove the dependency on PNC by March 2026.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. Delivery confidence has significantly improved since the 2021 reset, with the move to a product centric, agile development approach, the strengthening of the leadership team, and the successful product deployments and adoption. However, this programme remains large, complex and high risk. As the programme progresses through further phases of development the complexity and risk continue to pose a risk to plan and budget, this is fully recognised and being managed. Whist, March 2026 remains achievable, ongoing planning and funding pressures continue to present material risks. We are actively addressing these through targeted mitigation strategies, with regular oversight by the programme board. Despite a complex delivery environment, we are consistently achieving key milestones across the remaining LEDS Products and Enablers. Minor releases are being deployed effectively, ensuring that all live services remain stable and aligned with operational requirements. Strong collaboration with Forces and key stakeholders continues to be a priority. This engagement is critical to overcoming adoption challenges and ensuring the successful integration of new capabilities across the operational landscape. This is supported by IPA reviews which highlighted a high level of confidence in LEDS delivery, but noted continued complexity and risk associated with the development and adoption of this critical national infrastructure.","startDate":"2014-04-01","endDate":"2026-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2026. This is primarily due to the following factors. Despite the programme’s continued progress in a complex delivery environment, key milestones across the remaining LEDS Products and Enablers are being consistently achieved. This is underpinned by robust assurance practices that actively manage programme plans and mitigate risks. Minor releases are being deployed effectively, ensuring that all live services remain stable and aligned with operational requirements. Strong collaboration with police forces and key stakeholders remains a cornerstone of our delivery approach. This engagement is critical to overcoming adoption challenges and ensuring the successful integration of new capabilities across the operational landscape. The programme recognises the importance of maintaining resilience in support of critical national infrastructure and in parallel has commenced discussion to extend the PNC as contingency. To this end, commercial teams are actively exploring contingency options, including the potential extension of PNC support contracts. These considerations are being factored into a forthcoming programme decision point and will be progressed through formal governance channels.","fyBaseline":187.12,"fyForecast":123.39,"fyVariance":34.06,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. This variance reflects a more complete and mature understanding of delivery requirements and associated risks. These changes reflect the evolving complexity and scale of the programme, ensuring it remains fit for purpose and resilient in delivering critical national infrastructure. Key drivers include: • New cost responsibilities, such as funding external interfaces for wider Home Office use. • Emerging complexities in delivery, particularly from discovery work on products Person and EI components. • Increased resource needs, including roles not originally forecasted. • Expanded support and security requirements, including service support and architectural input. • VAT reallocation, where some costs are now recognised as non-recoverable. • Rising technical delivery costs, such as Supplier contract uplifts.","wholeLifeCost":905.07,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 611 to 905. This is primarily due to the following factors. This uplift reflects a more complete and mature understanding of delivery requirements and associated risks. These changes reflect the evolving complexity and scale of the programme, ensuring it remains fit for purpose and resilient in delivering critical national infrastructure. Key drivers include: • New cost responsibilities, such as funding external interfaces for wider Home Office use. • Emerging complexities in delivery, particularly from discovery work on products Person and EI components. • Increased resource needs, including roles not originally forecasted. • Expanded support and security requirements, including service support and architectural input. • VAT reallocation, where some costs are now recognised as non-recoverable. • Rising technical delivery costs, such as Supplier contract uplifts.","benefits":458.9,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 411 to 458. This is primarily due to the following factors‚ This uplift reflects a more complete and mature understanding of products reflecting the evolving complexity and scale of the programme. Benefits from efficiency savings, cost savings and outcome improvements for public and private sector stakeholders have been identified and appraised over a 12-year appraisal period from FY2021/22 to FY2035/36. A benefits-tracking framework and realisation plan has been established to monitor all programme benefits. Key benefits that will be delivered by LEDS include: • Improved safeguarding of missing persons. • Efficiency of missing persons investigations. • Reduced inefficiency from PNC outages. • Reduced time to train new users. • c.£7m lower run cost than PNC","themes":["Delivery & schedule","Cost & funding","Commercial & supply chain","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. Delivery confidence has significantly improved since the 2021 reset, with the move to a product centric, agile development approach, the strengthening of the…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2026. This is primarily due to the following factors. Despite the programme’s continued progress in a complex delivery environment, key milestones across the remaining LEDS Products and Enablers are being consistently achieved. This is underpinned by robust assurance practices that actively manage programme plans and mitigate risks. Minor releases are being deployed effectively, ensuring that all live services remain stable and aligned with operational requirements. Strong collaboration with police forces and key stakeholders remains a cornerstone of our delivery approach. This engagement is critical to overcoming adoption challenges and ensuring the successful integration of new capabilities across the operational landscape. The programme recognises the importance of maintaining resilience in support of critical national infrastructure and in parallel has commenced discussion to extend the PNC as contingency. To this end, commercial teams are actively exploring contingency options, including the potential extension of PNC support contracts. These considerations are being factored into a forthcoming programme decision point and will be progressed through formal governance channels.","narrativeClaimKind":null},{"id":"HO_0036_1617-Q2","year":2026,"name":"Law Enforcement Data Service","department":"HO","category":"Information and Communications Technology (ICT)","description":"The Law Enforcement Data Service (LEDS) is replacing the legacy Police National Computer (PNC) with a modern, secure and scalable data platform for policing and wider law enforcement agencies. LEDS is designed to provide continuity of core functionality while introducing enhanced capabilities, including image sharing, geo‑location data and automated alerts, enabling more effective access to and use of information across law enforcement. The PNC, which has been in operation for several decades, underpins critical policing activities, including arrests, traffic enforcement and safeguarding interventions. However, as an ageing system originally designed for an earlier technological environment, it is increasingly complex and costly to maintain and is less able to meet evolving operational and security requirements. LEDS provides a platform that supports more integrated, intelligence‑led policing and is designed to evolve over time in line with operational needs. By transitioning from legacy infrastructure to a modern data service, the programme aims to improve system resilience, data accessibility and the ability to respond effectively to emerging threats.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Amber delivery confidence assessment remains appropriate, reflecting continued progress in delivering the Law Enforcement Data Service (LEDS) and ongoing commitment to its modernisation objectives. While challenges remain, the programme is making measurable progress against its delivery plan, and successful delivery to agreed time and cost remains achievable in line with the approved business case.","startDate":"2014-04-01","endDate":"2026-12-31","scheduleNarrative":"The programme delivery schedule has been extended to enable Final Endpoint Switchover (FES) by September 2026 and programme closure by December 2026. This extension, along with the underpinning delivery milestones, was outlined in the updated programme business case, which was approved by InvestCo (Investment Committee) on 18 December 2025.","fyBaseline":218.33,"fyForecast":141.52,"fyVariance":35.18,"varianceNarrative":"The budget variance is less than or equal to 5 (4.6%) at the end of Q4, and remains within agreed tolerances. The reported 35% variance in the table reflects a comparison between the approved business case baseline (which includes Optimism Bias) and actual expenditure (which excludes Optimism Bias).","wholeLifeCost":1086.68,"costNarrative":"In year forecast of £146.11m vs a funding allocation of £139.71m represents a 4.6% increase/variance. This increase is due to bringing forward work identified in Persons, Vehicles and SRG for FY26/27 into FY25/26.","benefits":396.81,"benefitsNarrative":"Compared to financial year 24/25 Q4, the projects departmentally agreed benefits at 24/25 Q4 (measured in £m) decreased from £458.895m to £457.837m. This is primarily due to £1.06m of benefits moving from forecast benefit to realised.","themes":["Delivery & schedule","Cost & funding","Approvals & decisions","Technical & integration"],"evidenceExcerpt":"The Amber delivery confidence assessment remains appropriate, reflecting continued progress in delivering the Law Enforcement Data Service (LEDS) and ongoing commitment to its modernisation objectives. While challenges remain, the programme is making measurable progress against its delivery plan, and successful delivery to agreed time and cost remains…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The programme delivery schedule has been extended to enable Final Endpoint Switchover (FES) by September 2026 and programme closure by December 2026. This extension, along with the underpinning delivery milestones, was outlined in the updated programme business case, which was approved by InvestCo (Investment Committee) on 18 December 2025.","narrativeClaimKind":null}],"previous":{"id":"HO_0036_1617-Q2","year":2025,"name":"Law Enforcement Data Service","department":"HO","category":"ICT","description":"Law Enforcement Data Service (LEDS) Programme is a mature enabling programme, and a product-centric initiative that is replacing the end-of-life Police National Computer (PNC) with a modern, secure, and scalable platform. LEDS is critical national infrastructure that directly supports frontline policing and wider government priorities. LEDS is providing modern products, which can evolve over time to better meet the operational needs of law enforcement, as well as strong links, supporting Government priorities, including crime reduction, Violence against Women and Girls, and Serious Organised Crime (SOC). LEDS programme will incrementally deliver products that provide functional equivalence (parity) to PNC. It is delivering a suite of modern, cloud-based products that provide a unified view of law enforcement data, improve operational effectiveness, and enable future innovation. All products will be traced back to PNC data transactions to ensure parity with PNC is reached. Parity, in this context, means the minimum service required to support business continuity and ensure adoption, eventually allowing PNC to be retired. The programme is already delivering value through phased rollouts, with five products live across police forces and non-law enforcement agencies. The programme is on track to remove the dependency on PNC by March 2026.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. Delivery confidence has significantly improved since the 2021 reset, with the move to a product centric, agile development approach, the strengthening of the leadership team, and the successful product deployments and adoption. However, this programme remains large, complex and high risk. As the programme progresses through further phases of development the complexity and risk continue to pose a risk to plan and budget, this is fully recognised and being managed. Whist, March 2026 remains achievable, ongoing planning and funding pressures continue to present material risks. We are actively addressing these through targeted mitigation strategies, with regular oversight by the programme board. Despite a complex delivery environment, we are consistently achieving key milestones across the remaining LEDS Products and Enablers. Minor releases are being deployed effectively, ensuring that all live services remain stable and aligned with operational requirements. Strong collaboration with Forces and key stakeholders continues to be a priority. This engagement is critical to overcoming adoption challenges and ensuring the successful integration of new capabilities across the operational landscape. This is supported by IPA reviews which highlighted a high level of confidence in LEDS delivery, but noted continued complexity and risk associated with the development and adoption of this critical national infrastructure.","startDate":"2014-04-01","endDate":"2026-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2026. This is primarily due to the following factors. Despite the programme’s continued progress in a complex delivery environment, key milestones across the remaining LEDS Products and Enablers are being consistently achieved. This is underpinned by robust assurance practices that actively manage programme plans and mitigate risks. Minor releases are being deployed effectively, ensuring that all live services remain stable and aligned with operational requirements. Strong collaboration with police forces and key stakeholders remains a cornerstone of our delivery approach. This engagement is critical to overcoming adoption challenges and ensuring the successful integration of new capabilities across the operational landscape. The programme recognises the importance of maintaining resilience in support of critical national infrastructure and in parallel has commenced discussion to extend the PNC as contingency. To this end, commercial teams are actively exploring contingency options, including the potential extension of PNC support contracts. These considerations are being factored into a forthcoming programme decision point and will be progressed through formal governance channels.","fyBaseline":187.12,"fyForecast":123.39,"fyVariance":34.06,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. This variance reflects a more complete and mature understanding of delivery requirements and associated risks. These changes reflect the evolving complexity and scale of the programme, ensuring it remains fit for purpose and resilient in delivering critical national infrastructure. Key drivers include: • New cost responsibilities, such as funding external interfaces for wider Home Office use. • Emerging complexities in delivery, particularly from discovery work on products Person and EI components. • Increased resource needs, including roles not originally forecasted. • Expanded support and security requirements, including service support and architectural input. • VAT reallocation, where some costs are now recognised as non-recoverable. • Rising technical delivery costs, such as Supplier contract uplifts.","wholeLifeCost":905.07,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 611 to 905. This is primarily due to the following factors. This uplift reflects a more complete and mature understanding of delivery requirements and associated risks. These changes reflect the evolving complexity and scale of the programme, ensuring it remains fit for purpose and resilient in delivering critical national infrastructure. Key drivers include: • New cost responsibilities, such as funding external interfaces for wider Home Office use. • Emerging complexities in delivery, particularly from discovery work on products Person and EI components. • Increased resource needs, including roles not originally forecasted. • Expanded support and security requirements, including service support and architectural input. • VAT reallocation, where some costs are now recognised as non-recoverable. • Rising technical delivery costs, such as Supplier contract uplifts.","benefits":458.9,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 411 to 458. This is primarily due to the following factors‚ This uplift reflects a more complete and mature understanding of products reflecting the evolving complexity and scale of the programme. Benefits from efficiency savings, cost savings and outcome improvements for public and private sector stakeholders have been identified and appraised over a 12-year appraisal period from FY2021/22 to FY2035/36. A benefits-tracking framework and realisation plan has been established to monitor all programme benefits. Key benefits that will be delivered by LEDS include: • Improved safeguarding of missing persons. • Efficiency of missing persons investigations. • Reduced inefficiency from PNC outages. • Reduced time to train new users. • c.£7m lower run cost than PNC","themes":["Delivery & schedule","Cost & funding","Commercial & supply chain","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. Delivery confidence has significantly improved since the 2021 reset, with the move to a product centric, agile development approach, the strengthening of the…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2026. This is primarily due to the following factors. Despite the programme’s continued progress in a complex delivery environment, key milestones across the remaining LEDS Products and Enablers are being consistently achieved. This is underpinned by robust assurance practices that actively manage programme plans and mitigate risks. Minor releases are being deployed effectively, ensuring that all live services remain stable and aligned with operational requirements. Strong collaboration with police forces and key stakeholders remains a cornerstone of our delivery approach. This engagement is critical to overcoming adoption challenges and ensuring the successful integration of new capabilities across the operational landscape. The programme recognises the importance of maintaining resilience in support of critical national infrastructure and in parallel has commenced discussion to extend the PNC as contingency. To this end, commercial teams are actively exploring contingency options, including the potential extension of PNC support contracts. These considerations are being factored into a forthcoming programme decision point and will be progressed through formal governance channels.","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":275,"attentionScore":45,"attentionReasons":["Current published delivery confidence is Amber","Published end date moved 275 days later","In-year forecast variance is +35.2%"]},{"id":"MOJ_0053_2021-Q4","year":2026,"name":"Accelerated Houseblocks","department":"MOJ","category":"Infrastructure and Construction","description":"The Accelerated Houseblocks Programme supports our 20,000 additional prison places commitment; its scope is to deliver around 2,400 places.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25-Q4, the NISTA Delivery Confidence Assessment remains at Amber. This is primarily due to inflation and increasing cost maturity resulting in increasing cost estimates and other market risks.","startDate":"2020-09-28","endDate":"2030-11-01","scheduleNarrative":"Compared to financial year 24/25-Q4 the programme’s end date changed from 10/07/28 to 01/11/30. This is primarily due to scope increases within the project resulting in more time required to achieve overall programme completion.","fyBaseline":608.61,"fyForecast":510.79,"fyVariance":16.07,"varianceNarrative":"The budget variance exceeds 5%. This is due to scope and cost rebaselining.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"This programme currently reports no monetised benefits. Due to the projected increasing prison population, this programme focuses on increasing capacity and there are no monetised benefits to be claimed. The programme's other benefits are defined in the current baseline as: construction benefits and outcomes (capacity, modern methods of construction and sustainability); to enable an improvement in prisoner rehabilitation outcomes; and, during its construction, deliver local community benefits.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 24/25-Q4, the NISTA Delivery Confidence Assessment remains at Amber. This is primarily due to inflation and increasing cost maturity resulting in increasing cost estimates and other market risks. Compared to financial year 24/25-Q4 the programme’s end date changed from 10/07/28 to 01/11/30. This is primarily due to scope increases…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4 the programme’s end date changed from 10/07/28 to 01/11/30. This is primarily due to scope increases within the project resulting in more time required to achieve overall programme completion.","narrativeClaimKind":null,"history":[{"id":"MOJ_0053_2021-Q4","year":2021,"name":"3K Prison Places","department":"MOJ","category":"Infrastructure and Construction","description":"The prison population is forecast is scheduled to rise significantly in the 2020s and the department is bringing forward new prison places to accommodate new offenders. This project is part of the 3,000 Additional Prison Places Programme and will deliver 2,500 Houseblocks places across the adult male estate.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber/red.This is primarily due to the following factors: The project is making good progress with selecting and assessing feasibility of proposed sites but is working to ambitious timelines which is dependent on several factors that are outside of the project's direct control. The need to secure planning permission for the new sites creates a risk of delay, should challenges arise at a local level.","startDate":"2020-09-28","endDate":"2024-05-13","scheduleNarrative":"The project end-date is 13 May 2024. This is primarily due to the following factors: The additional places will be delivered from January 2024, which will reduce the need to implement emergency capacity measures.","fyBaseline":21.52,"fyForecast":4.28,"fyVariance":-80.0,"varianceNarrative":"The budget variance exceeds 5%. The baseline costs are based on an initial set of assumptions about timing and cost. Although the project has made good progress in terms of selecting sites for expansion spend has been slower than anticipated.","wholeLifeCost":12491.43,"costNarrative":"The projects Baseline Whole Life Cost is �12491.43m. This is primarily due to the following factors: The baseline is an initial estimate of the costs of providing 3,000 additional prison places and then operating and maintaining them over their estimated 60 year life. The estimates are at an early stage of development and will be updated as relevant business cases are approved.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Workforce & capability"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber/red.This is primarily due to the following factors: The project is making good progress with selecting and assessing feasibility of proposed sites but is working to ambitious timelines which is dependent on several factors that are outside of the project's direct control.…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project end-date is 13 May 2024. This is primarily due to the following factors: The additional places will be delivered from January 2024, which will reduce the need to implement emergency capacity measures.","narrativeClaimKind":null},{"id":"MOJ_0053_2021-Q4","year":2022,"name":"Accelerated Houseblocks","department":"MOJ","category":"Infrastructure and Construction","description":"The prison population is forecast is scheduled to rise significantly in the 2020s and the department is bringing forward new prison places to accommodate new offenders. The Accelerated Houseblock Programme aims to deliver 2,500 places as part of the wider Prison Capacity Portfolio Programme with an aim to deliver over 20,000 places.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 decreased from Amber/red to Amber The Programme has just completed its 2nd design stage, Management Contractors have been appointed and the contract has been executed and signed. Confidence continues to be affected by the impact of COVID-19 and EU Exit, with ongoing risks regarding supply chain and inflationary pressures on the market with several infrastructure programmes underway across the Government.","startDate":"2020-09-28","endDate":"2024-05-13","scheduleNarrative":"Compared to 20/21 Q4, the project end date has remained static.","fyBaseline":52.2,"fyForecast":18.59,"fyVariance":-64.0,"varianceNarrative":"The budget variance exceeds 5%. The variance is due to some activity moving into the next financial year.","wholeLifeCost":12208.0,"costNarrative":"Compared to 2021-Q4, the projects Baseline Whole Life Cost decreased from 12491.43 (£m) to 12207.66 (£m). This is primarily due to the following factors: The whole life cost reported last year being based on initial estimates which have now been revised in the latest business case.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Commercial & supply chain","Approvals & decisions","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 decreased from Amber/red to Amber The Programme has just completed its 2nd design stage, Management Contractors have been appointed and the contract has been executed and signed. Confidence continues to be affected by the impact of…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to 20/21 Q4, the project end date has remained static.","narrativeClaimKind":null},{"id":"MOJ_0053_2021-Q4","year":2023,"name":"Accelerated Houseblocks","department":"MOJ","category":"Infrastructure and Construction","description":"The Accelerated Houseblock Programme aims to deliver around 2,400 places as part of the wider Prison Capacity Portfolio Programme.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. Compared to21/22 Q4, theproject'sDelivery Confidence Assessment rating remained Amber.The Amber assessment is driven by inflation risks and recruitment challenges.","startDate":"2020-09-28","endDate":null,"scheduleNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","fyBaseline":357.0,"fyForecast":61.5,"fyVariance":-83.0,"varianceNarrative":"The underspend is due to changes in scope and wider budget reprofiling.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This project currently reports no monetised benefits. Due to the projected increasing prisons population, this project focusses on increasing capacity and there are no monetised benefits to be claimed. The programme's other benefits are defined in the current baseline as: construction benefits and outcomes (capacity, modern methods of construction and sustainability); to enable an improvement in prisoner rehabilitation outcomes; and, during its construction, deliver local community benefits.","themes":["Commercial & supply chain","Cost & funding","Delivery & schedule","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. Compared to21/22 Q4, theproject'sDelivery Confidence Assessment rating remained Amber.The Amber assessment is driven by inflation risks and recruitment challenges.…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","narrativeClaimKind":null},{"id":"MOJ_0053_2021-Q4","year":2024,"name":"Accelerated Houseblocks","department":"MOJ","category":"Infrastructure and Construction","description":"The Accelerated Houseblocks Programme supports our 20,000 additional prison places commitment; its scope is to deliver around 2,400 places.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. Inflation risks contributing to the increasing cost estimate, which is greater than that estimated previously.","startDate":"2020-09-28","endDate":null,"scheduleNarrative":"Exempt under Section 22 of the Freedom of Information Act 2000 (Information intended for future publication)","fyBaseline":326.72,"fyForecast":148.46,"fyVariance":-55.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The underspend is due to delays following complexity of build and challenging site conditions, requiring some costs to be re-profiled into future financial years.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":0.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 0m. This project currently reports no monetised benefits. Due to the projected increasing prisons population, this project focusses on increasing capacity and there are no monetised benefits to be claimed. The programme's other benefits are defined in the current baseline as: construction benefits and outcomes (capacity, modern methods of construction and sustainability); to enable an improvement in prisoner rehabilitation outcomes; and, during its construction, deliver local community benefits.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. Inflation risks contributing to the increasing cost estimate, which is greater than that estimated previously. Exempt under Section 22 of the Freedom of Information…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 22 of the Freedom of Information Act 2000 (Information intended for future publication)","narrativeClaimKind":null},{"id":"MOJ_0053_2021-Q4","year":2025,"name":"Accelerated Houseblocks","department":"MoJ","category":"Infrastructure and Construction","description":"The Accelerated Houseblocks Programme supports our 20,000 additional prison places commitment; its scope is to deliver around 2,400 places.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Inflation, market risks, and increasing cost maturity contributing to increasing cost estimates.","startDate":"2020-09-28","endDate":"2028-07-10","scheduleNarrative":"The project's end-date at 24/25-Q4 is scheduled to be 10/07/2028. This is primarily due to the following factors‚ Challenging site conditions.","fyBaseline":559.04,"fyForecast":342.2,"fyVariance":38.79,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The underspend is due to delays following increased cost estimates which necessitated value engineering and scope review, requiring some costs to be re-profiled into future financial years.","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ This project currently reports no monetised benefits. Due to the projected increasing prisons population, this project focusses on increasing capacity and there are no monetised benefits to be claimed. The programme's other benefits are defined in the current baseline as: construction benefits and outcomes (capacity, modern methods of construction and sustainability); to enable an improvement in prisoner rehabilitation outcomes; and, during its construction, deliver local community benefits.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Inflation, market risks, and increasing cost maturity contributing to increasing cost estimates. The project's end-date at 24/25-Q4 is scheduled to be 10/07/2028.…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 24/25-Q4 is scheduled to be 10/07/2028. This is primarily due to the following factors‚ Challenging site conditions.","narrativeClaimKind":null},{"id":"MOJ_0053_2021-Q4","year":2026,"name":"Accelerated Houseblocks","department":"MOJ","category":"Infrastructure and Construction","description":"The Accelerated Houseblocks Programme supports our 20,000 additional prison places commitment; its scope is to deliver around 2,400 places.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25-Q4, the NISTA Delivery Confidence Assessment remains at Amber. This is primarily due to inflation and increasing cost maturity resulting in increasing cost estimates and other market risks.","startDate":"2020-09-28","endDate":"2030-11-01","scheduleNarrative":"Compared to financial year 24/25-Q4 the programme’s end date changed from 10/07/28 to 01/11/30. This is primarily due to scope increases within the project resulting in more time required to achieve overall programme completion.","fyBaseline":608.61,"fyForecast":510.79,"fyVariance":16.07,"varianceNarrative":"The budget variance exceeds 5%. This is due to scope and cost rebaselining.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"This programme currently reports no monetised benefits. Due to the projected increasing prison population, this programme focuses on increasing capacity and there are no monetised benefits to be claimed. The programme's other benefits are defined in the current baseline as: construction benefits and outcomes (capacity, modern methods of construction and sustainability); to enable an improvement in prisoner rehabilitation outcomes; and, during its construction, deliver local community benefits.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 24/25-Q4, the NISTA Delivery Confidence Assessment remains at Amber. This is primarily due to inflation and increasing cost maturity resulting in increasing cost estimates and other market risks. Compared to financial year 24/25-Q4 the programme’s end date changed from 10/07/28 to 01/11/30. This is primarily due to scope increases…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4 the programme’s end date changed from 10/07/28 to 01/11/30. This is primarily due to scope increases within the project resulting in more time required to achieve overall programme completion.","narrativeClaimKind":null}],"previous":{"id":"MOJ_0053_2021-Q4","year":2025,"name":"Accelerated Houseblocks","department":"MoJ","category":"Infrastructure and Construction","description":"The Accelerated Houseblocks Programme supports our 20,000 additional prison places commitment; its scope is to deliver around 2,400 places.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Inflation, market risks, and increasing cost maturity contributing to increasing cost estimates.","startDate":"2020-09-28","endDate":"2028-07-10","scheduleNarrative":"The project's end-date at 24/25-Q4 is scheduled to be 10/07/2028. This is primarily due to the following factors‚ Challenging site conditions.","fyBaseline":559.04,"fyForecast":342.2,"fyVariance":38.79,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The underspend is due to delays following increased cost estimates which necessitated value engineering and scope review, requiring some costs to be re-profiled into future financial years.","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ This project currently reports no monetised benefits. Due to the projected increasing prisons population, this project focusses on increasing capacity and there are no monetised benefits to be claimed. The programme's other benefits are defined in the current baseline as: construction benefits and outcomes (capacity, modern methods of construction and sustainability); to enable an improvement in prisoner rehabilitation outcomes; and, during its construction, deliver local community benefits.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Inflation, market risks, and increasing cost maturity contributing to increasing cost estimates. The project's end-date at 24/25-Q4 is scheduled to be 10/07/2028.…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 24/25-Q4 is scheduled to be 10/07/2028. This is primarily due to the following factors‚ Challenging site conditions.","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":844,"attentionScore":43,"attentionReasons":["Current published delivery confidence is Amber","Published end date moved 844 days later","In-year forecast variance is +16.1%"]},{"id":"BEIS_0241_2324-Q1","year":2026,"name":"BEPPS2","department":"DESNZ","category":"Infrastructure and Construction","description":"The Box Encapsulation Plant Product Store 2 (BEPPS2) is a critical enabler for Sellafield Ltd to allow continued high hazard retrieval operations from Magnox Swarf Storage Silo (MSSS) and Pile Fuel Cladding Silo (PFCS). The BEPPS2 project will provide the capacity to store circa 7500 packages of legacy Intermediate Level Waste (ILW), safely and securely in a modern facility for long term interim storage.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 decreased to Amber. This is primarily due to the following factors: Although target design maturity has been achieved, and good progress continues in bulk excavation and preparation for construction on the site, placement of the civil substructure sub-contract is ongoing. Timely release of the sanction held against the Outline Business Case (OBC) is essential to avoid delay to future key commitments required to progress project delivery and impact to the critical path. A prudent assessment of Amber recognises the potential to impact future key commitments required to progress project delivery. The rating is expected to return to Green once the sanction is released.","startDate":"2017-11-01","endDate":"2035-06-30","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same at 30/06/2035.","fyBaseline":61.33,"fyForecast":60.44,"fyVariance":1.45,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":727.6,"costNarrative":"The increase to the project's departmentally agreed Whole Life Cost at 25/26-Q4 is primarily due to: Annual Indexation, in line with the agreed indices.","benefits":null,"benefitsNarrative":"There are no monetised benefits within the BEPPS2 project however, it will contribute towards NDA’s strategic outcome 33: All Intermediate Level Waste in interim storage. The project does this by providing additional storage on the Sellafield site.","themes":["Delivery & schedule","Cost & funding","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 decreased to Amber. This is primarily due to the following factors: Although target design maturity has been achieved, and good progress continues in bulk excavation and preparation for construction on the site, placement of the civil substructure…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same at 30/06/2035.","narrativeClaimKind":null,"history":[{"id":"BEIS_0241_2324-Q1","year":2024,"name":"BEPPS2","department":"DESNZ","category":"Infrastructure and Construction","description":"The Box Encapsulation Plant Product Store (BEPPS2) is a critical enabler for Sellafield Ltd to allow high hazard retrieval operations from Magnox Swarf Storage Silo (MSSS) and Pile Fuel Cladding Silo (PFCS). The BEPPS2 project will provide the capacity to store 7470 packages of legacy Intermediate Level Waste (ILW), safely and securely in a modern facility with a design life of 100 years.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 is Green. This is primarily due to the following factors. This is a nuclear project on an operational nuclear site. The Project is in the define stage. The BEPPS2 project is being delivered by the Programme and Project Partnership (PPP). The SRO DCA is a RAG rating of GREEN representing delivery against the Outline Business Case (OBC) approved by HMG in September 2023. The project is showing no significant threat to the overall P80 schedule and continues to proactively manage opportunities whilst mitigating and balancing current and future threats, keeping the forecast completion of the BEPPS2 project within the strategic tolerances of the Programme.","startDate":"2017-11-01","endDate":"2035-06-30","scheduleNarrative":"The project's end-date at 23/24-Q4 is 2035-06-30. This is primarily due to the following factors. The Project remains on schedule and there is no change to the date of 30 June 2035.","fyBaseline":27.7,"fyForecast":14.81,"fyVariance":-47.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The in year spend is less than the budget (baseline) for 2023/24 due to intentionally not taking over the site as initially planned as there was no project requirement yet, efficiencies achieved on Site Preparation and Surveys and non utilisation of contingency/estimating uncertainty. This shows that the project is not spending money ahead of demand whilst not affecting the overall spend position or having any impact on the project schedule. This better aligns to the current delivery strategy.","wholeLifeCost":727.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 23/24-Q4 is 727m. This is primarily due to the following factors. The BEPPS2 budgeted cost (baseline) has increased, this is due to escalation in line with the agreed indices.","benefits":0.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 0m. Contribution towards NDA's strategic outcome 33: All Intermediate Level Waste in interim storage. The project does this by providing additional storage on the Sellafield site.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 is Green. This is primarily due to the following factors. This is a nuclear project on an operational nuclear site. The Project is in the define stage. The BEPPS2 project is being delivered by the Programme and Project Partnership (PPP). The SRO DCA is a RAG rating of GREEN…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 23/24-Q4 is 2035-06-30. This is primarily due to the following factors. The Project remains on schedule and there is no change to the date of 30 June 2035.","narrativeClaimKind":null},{"id":"BEIS_0241_2324-Q1","year":2025,"name":"BEPPS2","department":"DESNZ","category":"Infrastructure and Construction","description":"The Box Encapsulation Plant Product Store (BEPPS2) is a critical enabler for Sellafield Ltd to allow high hazard retrieval operations from Magnox Swarf Storage Silo (MSSS) and Pile Fuel Cladding Silo (PFCS). The BEPPS2 project will provide the capacity to store 7470 packages of legacy Intermediate Level Waste (ILW), safely and securely in a modern facility with a design life of 100 years.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at GREEN. This is primarily due to the following factors‚ This is a nuclear project on an operational nuclear site. The Project is in the define stage. The BEPPS2 project is being delivered by the Programme and Project Partnership (PPP). The SRO DCA is a RAG rating of GREEN representing delivery against the Outline Business Case (OBC) approved by HMG in September 2023. The project is showing no significant threat to the overall P80 schedule and continues to proactively manage opportunities whilst mitigating and balancing current and future threats, keeping the forecast completion of the BEPPS2 project within the strategic tolerances of the Programme.","startDate":"2017-11-01","endDate":"2035-06-30","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 30/06/2035. This is primarily due to the following factors‚ The Project remains on schedule and there is no change to the date of 30/06/2035.","fyBaseline":38.71,"fyForecast":35.74,"fyVariance":7.67,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The in year spend is less than the budget (baseline) for 2024/25 due primarily non utilisation of contingency.","wholeLifeCost":747.34,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 727 to 747. This is primarily due to the following factors‚ Compared to 23/24-Q4, the BEPPS2 budgeted cost (baseline) has increased, this is due to escalation in line with the agreed indices.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ There are no monetised benefits within the BEPPS2 project however, it will contribute towards NDA’s strategic outcome 33: All Intermediate Level Waste in interim storage. The project does this by providing additional storage on the Sellafield site.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at GREEN. This is primarily due to the following factors‚ This is a nuclear project on an operational nuclear site. The Project is in the define stage. The BEPPS2 project is being delivered by the Programme and Project…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 30/06/2035. This is primarily due to the following factors‚ The Project remains on schedule and there is no change to the date of 30/06/2035.","narrativeClaimKind":null},{"id":"BEIS_0241_2324-Q1","year":2026,"name":"BEPPS2","department":"DESNZ","category":"Infrastructure and Construction","description":"The Box Encapsulation Plant Product Store 2 (BEPPS2) is a critical enabler for Sellafield Ltd to allow continued high hazard retrieval operations from Magnox Swarf Storage Silo (MSSS) and Pile Fuel Cladding Silo (PFCS). The BEPPS2 project will provide the capacity to store circa 7500 packages of legacy Intermediate Level Waste (ILW), safely and securely in a modern facility for long term interim storage.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 decreased to Amber. This is primarily due to the following factors: Although target design maturity has been achieved, and good progress continues in bulk excavation and preparation for construction on the site, placement of the civil substructure sub-contract is ongoing. Timely release of the sanction held against the Outline Business Case (OBC) is essential to avoid delay to future key commitments required to progress project delivery and impact to the critical path. A prudent assessment of Amber recognises the potential to impact future key commitments required to progress project delivery. The rating is expected to return to Green once the sanction is released.","startDate":"2017-11-01","endDate":"2035-06-30","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same at 30/06/2035.","fyBaseline":61.33,"fyForecast":60.44,"fyVariance":1.45,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":727.6,"costNarrative":"The increase to the project's departmentally agreed Whole Life Cost at 25/26-Q4 is primarily due to: Annual Indexation, in line with the agreed indices.","benefits":null,"benefitsNarrative":"There are no monetised benefits within the BEPPS2 project however, it will contribute towards NDA’s strategic outcome 33: All Intermediate Level Waste in interim storage. The project does this by providing additional storage on the Sellafield site.","themes":["Delivery & schedule","Cost & funding","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 decreased to Amber. This is primarily due to the following factors: Although target design maturity has been achieved, and good progress continues in bulk excavation and preparation for construction on the site, placement of the civil substructure…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same at 30/06/2035.","narrativeClaimKind":null}],"previous":{"id":"BEIS_0241_2324-Q1","year":2025,"name":"BEPPS2","department":"DESNZ","category":"Infrastructure and Construction","description":"The Box Encapsulation Plant Product Store (BEPPS2) is a critical enabler for Sellafield Ltd to allow high hazard retrieval operations from Magnox Swarf Storage Silo (MSSS) and Pile Fuel Cladding Silo (PFCS). The BEPPS2 project will provide the capacity to store 7470 packages of legacy Intermediate Level Waste (ILW), safely and securely in a modern facility with a design life of 100 years.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at GREEN. This is primarily due to the following factors‚ This is a nuclear project on an operational nuclear site. The Project is in the define stage. The BEPPS2 project is being delivered by the Programme and Project Partnership (PPP). The SRO DCA is a RAG rating of GREEN representing delivery against the Outline Business Case (OBC) approved by HMG in September 2023. The project is showing no significant threat to the overall P80 schedule and continues to proactively manage opportunities whilst mitigating and balancing current and future threats, keeping the forecast completion of the BEPPS2 project within the strategic tolerances of the Programme.","startDate":"2017-11-01","endDate":"2035-06-30","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 30/06/2035. This is primarily due to the following factors‚ The Project remains on schedule and there is no change to the date of 30/06/2035.","fyBaseline":38.71,"fyForecast":35.74,"fyVariance":7.67,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The in year spend is less than the budget (baseline) for 2024/25 due primarily non utilisation of contingency.","wholeLifeCost":747.34,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 727 to 747. This is primarily due to the following factors‚ Compared to 23/24-Q4, the BEPPS2 budgeted cost (baseline) has increased, this is due to escalation in line with the agreed indices.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ There are no monetised benefits within the BEPPS2 project however, it will contribute towards NDA’s strategic outcome 33: All Intermediate Level Waste in interim storage. The project does this by providing additional storage on the Sellafield site.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at GREEN. This is primarily due to the following factors‚ This is a nuclear project on an operational nuclear site. The Project is in the define stage. The BEPPS2 project is being delivered by the Programme and Project…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 30/06/2035. This is primarily due to the following factors‚ The Project remains on schedule and there is no change to the date of 30/06/2035.","narrativeClaimKind":null},"ratingDelta":1,"transition":"Worsened","endDateDeltaDays":0,"attentionScore":43,"attentionReasons":["Current published delivery confidence is Amber","Published rating worsened from Green to Amber"]},{"id":"DECC_0005_1112-Q1","year":2026,"name":"GEOLOGICAL DISPOSAL FACILITY","department":"DESNZ","category":"Infrastructure and Construction","description":"A GDF provides an internationally recognised, safe, and permanent solution for the UK’s most hazardous radioactive waste. As a nationally significant infrastructure programme a GDF will also provide an opportunity to sustainably boost the local economy of the host community to transform itself for many generations. The programme also supports the delivery of the UK’s nuclear new build programme.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 the NISTA Delivery confidence assessment (DCA) rating at 25/26 remained at 'Red'. This is primarily due to the following factors, withdrawal of one of the remaining three community partnerships reducing the portfolio diversity, outcome of the full spending review settlement resulting in reduced programme scope delivery over the next few years and deferral of critical path activities in the move to the next phase. An action plan is in place to address the next steps as identified.","startDate":"2008-06-12","endDate":null,"scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date remains in the range 2050-2060. This is primarily due to the following factors‚ the programme has continued to progress the site evaluation and community willingness activities during 25/26. The programme continues to prioritise activities in line with the available SR settlement funding.","fyBaseline":90.86,"fyForecast":71.13,"fyVariance":21.71,"varianceNarrative":"The in-year budget variance this year is greater than minus 5% compared to the budget with underspend due to the outcome of the spending review settlement for 25/26 and further requests for budget reduction in line with other NDA group prioritisation and efficiencies. The main variance to the budget spend in year was due closure of the Theddlethorpe Community Partnership in June 2025. Further reductions in internal spend were due to mutually agreed voluntary exit and associated slowdown in external spend to align with the overall SR settlement.","wholeLifeCost":null,"costNarrative":"The project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) remains in the range of £20,300m to £53,300m at 17/18 money values. This is primarily due to the following factors: the programme is at an early stage of development, and the range reflects the uncertainty of the programme associated with potential host site, geology and technical requirements.","benefits":null,"benefitsNarrative":"As the programme is at such an early stage there are currently no baselined monetised benefits. The benefits of a GDF are wide-ranging and will span many future generations, they all into four main categories: 1) It is an essential environmental protection project – finally disposing of legacy most hazardous radioactive waste and providing a safe permanent solution. 2) Enabling the completion of the NDA decommissioning mission across the NDA Group – avoiding the very significant costs and risks of keeping the waste safe and secure in storage facilities above ground for many thousands of years. 3) An enabler for nuclear new build. 4) Significant host community benefits – transformational opportunity by creating thousands of jobs, a highly skilled local workforce, and business opportunities for more than 100 years. The near-term community benefits continue to be delivered with over £14m of Community Investment funding awarded across the Community Partnerships formed to date.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 the NISTA Delivery confidence assessment (DCA) rating at 25/26 remained at 'Red'. This is primarily due to the following factors, withdrawal of one of the remaining three community partnerships reducing the portfolio diversity, outcome of the full spending review settlement resulting in reduced programme scope delivery over…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end-date remains in the range 2050-2060. This is primarily due to the following factors‚ the programme has continued to progress the site evaluation and community willingness activities during 25/26. The programme continues to prioritise activities in line with the available SR settlement funding.","narrativeClaimKind":null,"history":[{"id":"DECC_0005_1112-Q1","year":2020,"name":"Geological Disposal Facility Programme (GDF)","department":"BEIS","category":"Infrastructure and Construction","description":"To site and construct a Geological Disposal Facility for the disposal for higher activity radioactive waste.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber, which has not changed since last year�s Q2 1819 Amber, due primarily to the following factors; - This is a long term programme and uncertainties and risks still remain, including the ability to attract and secure a willing GDF host community reflecting the continued amber assessment. - As the programme progresses the uncertainties associated with the number of communities, GDF solutions, location(s), extent of the geological characterisation and the nature of the design solutions will be resolved, however this will take a number of years. Since the Q2 1920 (30th September 2019) Amber IPA DCA, the following non-project operating environment activities have impacted the original Q2 IPA DCA; - The siting process is in progress following launch in December 2018 and continues to be one of the main activities during this phase of the programme, relying on the approach from volunteer communities. Since the Q2 1920 (30th September 2019) Amber IPA DCA, the following primary project actions have impacted the original Q2 IPA DCA; - The programme has received approval to proceed with community engagement, disbursement of investment funding and site evaluation, a significant move to the next stage of the programme. - The programme and business transformation activities continue to move towards a delivery organisation in support of the move from policy development to siting and community engagement.","startDate":"2008-06-30","endDate":"2040-12-31","scheduleNarrative":"The scheduled baseline project end date at Q2 1920 (30th September 2019) is 31/12/40, has not changed since last year's Q2 1819 date of 31/12/40, due primarily to the following factors; - Schedule remains in line with the ambition to identify the location for, design and construct a geological disposal facility by the 2040's. - Delivery continues in line with the schedule, progressing as planned to secure approval to proceed with the current phase and development of the next phase, however progress is influenced by the levels of community engagement and pace of progress to form working groups. Since the Q2 1920 (30th September 2019) baseline project end date of 31/12/40, the following non-project operating environment activities have impacted the original Q2 baseline project end date; - The ambition remains, although there is ongoing uncertainty due to the volunteer approach and hence the location, geology and design for the facility. Since the Q2 1920 (30th September 2019) baseline project end date of 31/12/40, the following primary project actions have impacted the original Q2 baseline project end date; - Further engagement activity and pro-active stakeholder events are in progress to identify and encourage the next wave of interested communities in line with the project delivery ambitions. - Organisational transformation, strengthening of capability and capacity increase is in progress to meet the demands of the schedule.","fyBaseline":46.52,"fyForecast":46.52,"fyVariance":0.0,"varianceNarrative":"Budget variance less than 5%","wholeLifeCost":12743.0,"costNarrative":"The baseline Whole Life Cost at Q2 1920 (30th September 2019) is �12,743.00 m, has increased by �399.04 m since last year's Q2 1819 (�m) baseline Whole Life Cost of �12,343.96 m, due primarily to the following factors; - The increase in costs since last year are primarily down to inflation and revised assumptions during the siting and construction phases. All figures are provided in real rather than nominal values due to the long timescales associated with this programme. - It does not include any provision for waste disposal from a new nuclear build programme, as this will be funded by new nuclear operators. Since the Q2 1920 (30th September 2019) �12,743.00 m baseline Whole Life Cost, the following non-project operating environment activities have impacted the original baseline Q2 Whole Life Cost; - The Whole Life Cost figure represents the estimated cost of designing, constructing and operating the GDF out to the 2130s. Note that the figure reported here only relates to a GDF for legacy waste and waste arising from the existing fleet of nuclear reactors. - In line with other Government programmes at an early stage of development, the estimate does not include any allowance for risk, uncertainty or optimism bias. Since the Q2 1920 (30th September 2019) �12,743.00 m baseline Whole Life Cost, the following primary project actions have impacted the original Q2 baseline Whole Life Cost; - The Business Case to proceed with community engagement, disbursement and site evaluation has received approval and has commenced. - The next phase of the programme which will include geological characterisation, community engagement, solution development, technical design, delivery partner engagement and early procurements is in the early stages of development which will inform the Whole Life Cost.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Scope & requirements"],"evidenceExcerpt":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber, which has not changed since last year�s Q2 1819 Amber, due primarily to the following factors; - This is a long term programme and uncertainties and risks still remain, including the ability to attract and secure a willing GDF host community reflecting the…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2020","sourceLabel":"IPA Annual Report 2019-20","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The scheduled baseline project end date at Q2 1920 (30th September 2019) is 31/12/40, has not changed since last year's Q2 1819 date of 31/12/40, due primarily to the following factors; - Schedule remains in line with the ambition to identify the location for, design and construct a geological disposal facility by the 2040's. - Delivery continues in line with the schedule, progressing as planned to secure approval to proceed with the current phase and development of the next phase, however progress is influenced by the levels of community engagement and pace of progress to form working groups. Since the Q2 1920 (30th September 2019) baseline project end date of 31/12/40, the following non-project operating environment activities have impacted the original Q2 baseline project end date; - The ambition remains, although there is ongoing uncertainty due to the volunteer approach and hence the location, geology and design for the facility. Since the Q2 1920 (30th September 2019) baseline project end date of 31/12/40, the following primary project actions have impacted the original Q2 baseline project end date; - Further engagement activity and pro-active stakeholder events are in progress to identify and encourage the next wave of interested communities in line with the project delivery ambitions. - Organisational transformation, strengthening of capability and capacity increase is in progress to meet the demands of the schedule.","narrativeClaimKind":null},{"id":"DECC_0005_1112-Q1","year":2021,"name":"Geological Disposal Facility Programme (GDF)","department":"BEIS","category":"Infrastructure and Construction","description":"The primary objective of the programme is to site and construct a permanent geological disposal facility (GDF) as the safe, secure and environmentally responsible solution to the long-term management of higher-activity radioactive waste in the UK, excluding Scotland. The programme also supports the delivery of the UK's nuclear new build programme because before development consents for new nuclear power stations are granted, the Government needs to be satisfied that effective arrangements exist or will exist to manage and dispose of the wastes they will produce.","ipaDca":"Green","sroDca":null,"deliveryConfidence":"Green","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating decreased from Amber to Green. This is primarily due to the following factors: The programme delivery confidence has moved to green in the period due to the progress in engaging volunteer communities; two working groups have been formed and additional interested parties are being actively engaged. The transformation of the Geological Disposal Facility (GDF) programme organisation continues with ongoing recruitment to meet the delivery needs however, there is still work to do on the detailed transformation planning considering the future changes at RWM to enact plans for the NDA's Single Waste Division. It should be noted that the GDF programme spans a significant time period on a whole life basis and the programme is still at a very early stage in the lifecycle, construction is due to start in the 2040s. The programme still faces exceptional uncertainty levels at this stage, with success dependent on agreeing a site within a willing community and the associated geological uncertainties this presents.","startDate":"2008-06-30","endDate":"2040-12-31","scheduleNarrative":"Compared to financial year 19/20-Q2, the project's end-date remained scheduled to finish on 31 December 2040 . This is primarily due to the following factors: Significant progress has been made over the past year and work continues to drive the schedule and mitigate risks to meet the delivery milestone dates. The first two working groups have been established enabling discussions to begin with potential host communities and pioneering research is underway to underpin delivery of the Geological Disposal Facility (GDF) including the testing of a new approach to the sealing of deep boreholes. The organisational transformation continues to enhance capability as the programme moves from research to delivery leading to enhanced planning for the GDF and additional engagement with regulators building confidence and maintaining a constructive dialogue. The programme also continues to progress risk mitigation activities and work has been launched to support the bring forward of seismic surveys in support of site evaluation, a key step in the overall GDF site selection process.","fyBaseline":48.47,"fyForecast":33.6,"fyVariance":-31.0,"varianceNarrative":"The budget variance exceeds 5%. The main variances and reduced in year spend are due to two main reasons: 1) There were delays to the initial launch of the siting process resulting in a fewer number of assumed / forecast working groups and the associated costs in this FYr. This position has started to improve as there are now two working groups in place. The difficulties associated with CoVID have reduced the planned stakeholder engagement and communication activities with an associated reduction in cost. 2) There have been delays in the technical work and associated spend; commencement of site evaluation works due to the delays in working group formation and search area agreement.","wholeLifeCost":12743.0,"costNarrative":"Compared to financial year 19/20-Q2, the projects Baseline Whole Life Cost remained at �12743.00m. This is primarily due to the following factors: The costs presented are only currently the Nuclear Decommissioning Authority (NDA) net costs for the Geological Disposal Facility (GDF) programme - the information on Whole Life Costs (WLC) is derived from figures used in NDA's 2018 Annual Report and Accounts (ARAC) scenario GDF cost estimate (in Sept 2018 money values). Note that the costs reported here only cover NDA costs related to a GDF for legacy waste and waste arising from the existing fleet of nuclear reactors, it does not include any provision for waste disposal from a new nuclear build programme, as this will be funded by new nuclear operators. In line with other Government programmes at an early stage of development, the WLC estimate does not include any allowance for risk, uncertainty or optimism bias. The estimate is being reviewed alongside the wider update of the programme business case which will be available in due course.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Technical & integration","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating decreased from Amber to Green. This is primarily due to the following factors: The programme delivery confidence has moved to green in the period due to the progress in engaging volunteer communities; two working groups have been formed and…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 19/20-Q2, the project's end-date remained scheduled to finish on 31 December 2040 . This is primarily due to the following factors: Significant progress has been made over the past year and work continues to drive the schedule and mitigate risks to meet the delivery milestone dates. The first two working groups have been established enabling discussions to begin with potential host communities and pioneering research is underway to underpin delivery of the Geological Disposal Facility (GDF) including the testing of a new approach to the sealing of deep boreholes. The organisational transformation continues to enhance capability as the programme moves from research to delivery leading to enhanced planning for the GDF and additional engagement with regulators building confidence and maintaining a constructive dialogue. The programme also continues to progress risk mitigation activities and work has been launched to support the bring forward of seismic surveys in support of site evaluation, a key step in the overall GDF site selection process.","narrativeClaimKind":null},{"id":"DECC_0005_1112-Q1","year":2022,"name":"Geological Disposal Facility Programme (GDF)","department":"BEIS","category":"Infrastructure and Construction","description":"The primary objective of the programme is to site and construct a permanent geological disposal facility (GDF) as the safe, secure and environmentally responsible solution to the long-term management of higher-activity radioactive waste in the UK, excluding Scotland. A GDF is the internationally agreed and only viable permanent answer to the UK's existing legacy of Highly radioactive waste. As a nationally significant infrastructure programme a GDF will also provide an opportunity to sustainably boost the economy of the host region and local community to transform itself for many generations. The programme also supports the delivery of the UK's nuclear new build programme as the Government needs to be satisfied that effective arrangements exist or will exist to manage and dispose of the wastes they will produce before development consents for new nuclear power stations are granted.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 increased from Green to Amber The SRO SQA has changed from green to amber due to ongoing funding constraints. The programme faces large uncertainties at this stage due to the site selection process; Until we confirm a willing community, a suitable site, and test the site characteristics, we cannot be confident of timescales and costs. - Uncertainty in finding a willing community continues to reduce as three Community Partnerships have now been formed and a working group progressing towards Community Partnership. There is a pipeline of further potential communities with good site prospects. - There has been considerable progress with enabling activities to support the current and next phases: business cases for major permissions work, and a property value protection scheme are in progress. Plans are underway to start seismic investigations of potential sites in Copeland. The transformation and capability build of the organisation continues with development to support seismic surveys and technical evaluation activities. Confidence in engaging volunteer communities has grown further with the formation of three community partnerships in West Cumbria and a fourth working group in East Lindsey. Active and focussed engagement continues with additional communities. The transformation of the GDF programme continues with ongoing capability development and recruitment to meet the changing nature of the programme preparing for the next significant phase - concept design and site suitability. The GDF is now part of the Major Capital Programmes Directorate of the newly formed NDA Nuclear Waste Services. It should be noted that the GDF programme spans a significant time period on a whole life basis and is still at a very early stage in the lifecycle, construction is due to start in the 2040s. The programme still faces exceptional uncertainty levels at this stage with success dependent on agreeing a site with a willing community and the associated complexity of geology.","startDate":"2008-06-30","endDate":"2040-12-31","scheduleNarrative":"Compared to 2021-Q4, your project end-date remained scheduled to finish on 31 DEC 2040 . This is primarily due to the following factors: Significant progress has been made during the financial year even with the ongoing constraints of CoVID and the associated impact for community engagement. However, many work-arounds have been effective in continuing engagement, noting that the communities set the pace for their own progress through the 'willing community' process. 3 community partnerships and now been formed and a fourth working group is preparing for Community Partnership formation and initial community investment grants have been approved. Work continues to progress on potential additional community working groups in particular for targeted community lead generation. The detailed preparations are underway for starting the first seismic surveys - Copeland summer 2022. The detailed planning and procurement processes are underway for the formal site evaluation of all current sites. The schedule remains on target for the first key decision point - site down selection in 25/26.","fyBaseline":52.03,"fyForecast":43.17,"fyVariance":-17.0,"varianceNarrative":"The budget variance exceeds 5%. The budget variance exceeds 5%. This is primarily due to the following factors resulting in a reduced spend in year: 1) Slower than anticipated progression of communities to form Working Groups and move to Community Partnerships. In addition, we have had fewer WGs and CPs being formed than assumed in the budget. Also, ongoing CoVID impacts with more virtual events scheduled over the year and the associated reduction in spend. 2) Budget constraints applied to the final quarter of the year have resulted in deferrals, including the next phase of the borehole sealing demonstration, and slow down in some of the technical support activities and associated reduction in spend. Decisions were taken to prioritise activities that support the critical and key paths to the first major decision point in 2025/26. Recruitment of resources required to deliver increased capability within the programme to support the next phases of work was paused.","wholeLifeCost":20300.0,"costNarrative":"Compared to2021-Q4, the projects Baseline Whole Life Cost increased from 12743.00 (£m) to 20300.00 (£m). This is primarily due to the following factors: The costs have been aligned with the HMG approved programme business case (Oct 2019). The revised Whole Life Cost (WLC) envelope includes a range of scenarios associated with the waste inventory and the significant levels of variability associated with the location and the possible geological complexities. Current estimates are between £10.2bn-£27.3bn cost to HMG (as stated in the Q3 report) to dispose of the legacy waste, rising to £20.3-£53.3bn (aligned to the 2019 approved FBC) for the whole inventory, including an allowance for risk and optimism bias. The non HMG costs will be covered mainly through the Funded Decommissioning Programme for new nuclear build projects. The WLC costs are spread over a period to c.2200.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 increased from Green to Amber The SRO SQA has changed from green to amber due to ongoing funding constraints. The programme faces large uncertainties at this stage due to the site selection process; Until we confirm a willing…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to 2021-Q4, your project end-date remained scheduled to finish on 31 DEC 2040 . This is primarily due to the following factors: Significant progress has been made during the financial year even with the ongoing constraints of CoVID and the associated impact for community engagement. However, many work-arounds have been effective in continuing engagement, noting that the communities set the pace for their own progress through the 'willing community' process. 3 community partnerships and now been formed and a fourth working group is preparing for Community Partnership formation and initial community investment grants have been approved. Work continues to progress on potential additional community working groups in particular for targeted community lead generation. The detailed preparations are underway for starting the first seismic surveys - Copeland summer 2022. The detailed planning and procurement processes are underway for the formal site evaluation of all current sites. The schedule remains on target for the first key decision point - site down selection in 25/26.","narrativeClaimKind":null},{"id":"DECC_0005_1112-Q1","year":2023,"name":"Geological Disposal Facility Programme (GDF)","department":"DESNZ","category":"Infrastructure and Construction","description":"The primary objective of the programme is to site and construct a permanent geological disposal facility (GDF) as the safe, secure and environmentally responsible solution to the long term management of higher activity radioactive waste in the UK excluding Scotland. A GDF is the internationally agreed and only viable permanent answer to the UK's existing legacy of Highly radioactive waste. As a nationally significant infrastructure programme a GDF will also provide an opportunity to sustainability boost the economy of the host region and local community to transform itself for many generations. The programme also supports the delivery of the UK's nuclear new build programme as the Government needs to be satisfied that effective arrangements exist or will exist to manage and dispose of the wastes they will produce before development consents for new nuclear power stations are granted.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber (IPA rating). This is primarily due to the following factors. Departmental narrative on schedule","startDate":"2008-06-30","endDate":"2050-03-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 increased from 2040-12-31 to 2050-03-31. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 increased from 2040-12-31 to 2050-03-31. This is primarily due to the following factors. The indicative project end date is that given for the first emplacement of legacy radioactive waste in the facility, aligned to the Tranche 3 sub programme business case; this includes updated timescales in the securing of willing communities, a better understanding of the full scope of work to characterise the sites through the drilling of deep boreholes and associated consents and permissions and a level of schedule risk and uncertainty.It should be noted that the programme continues to face large uncertainties at this stage due to the site selection process; confidence will increase as the potential site locations are down selected and fully characterised. The schedule remains on target for the first key decision point - site down selection in 2026.","fyBaseline":52.12,"fyForecast":66.1,"fyVariance":27.0,"varianceNarrative":"The budget variance exceeds 5%. The budget variance exceeds 5%. This is primarily due to the following factors resulting in additional spend in year: 1) A case was made to bring forward the seismic survey for Copeland in order to support the site evaluation and characterisation which was completed during the financial year, in addition the opportunity has been taken to procure existing information to further inform site evaluation and characterisation at other sites. 2) Ongoing progress of community partnerships and the utilisation of the Community Investment Funding, recovering some of the activities that were constrained due COVID impacts in prior years.","wholeLifeCost":20300.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 remained at 20300m. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 remained at 20300m. This is primarily due to the following factors. The whole life costs align with those approved in the Programme Level Business Case. The WLC costs presented in the GMPP report cover both the HMG and non-HMG costs to the programme and are the lower bound estimate within the business case. The lower bound 20.3bn covers the lower technical complexity of the GDF site construction and includes legacy waste, waste from new nuclear and other potential materials. The upper bound of the business case 53.3bn includes for a higher technical complexity GDF construction site, contingency, optimism bias and uncertainty.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. The project did not provide departmental-agree monetised benefits at 22/23-Q4. As a nationally significant infrastructure project which will span decades, a GDF will also provide a unique opportunity to sustainably boost the economy of the host region and local community to transform itself for many generations. The benefits of a GDF are wide-ranging and will span many future generations, they fall into four main categories: 1. It is an essential environmental protection project - finally disposing of legacy radioactive waste and providing a safe, permanent solution.2. Enabling the completion of the NDA decommissioning mission across the NDA Group and in particular Sellafield - avoiding the very significant costs and risks of keeping the waste safe and secure in storage facilities above ground for many thousands of years.3. A key enabler for nuclear new build contributing to the British Energy Security Strategy and net-zero 2050 .4. Significant host community benefits - a transformational opportunity by creating thousands of jobs, a highly skilled local workforce, and business opportunities for more than 100 years as presented in the GDF Creating Jobs & Skills report as well infrastructure investment and community support.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Technical & integration"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber (IPA rating). This is primarily due to the following factors. Departmental narrative on schedule Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 increased from 2040-12-31 to 2050-03-31. This is primarily due to the following…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 increased from 2040-12-31 to 2050-03-31. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 increased from 2040-12-31 to 2050-03-31. This is primarily due to the following factors. The indicative project end date is that given for the first emplacement of legacy radioactive waste in the facility, aligned to the Tranche 3 sub programme business case; this includes updated timescales in the securing of willing communities, a better understanding of the full scope of work to characterise the sites through the drilling of deep boreholes and associated consents and permissions and a level of schedule risk and uncertainty.It should be noted that the programme continues to face large uncertainties at this stage due to the site selection process; confidence will increase as the potential site locations are down selected and fully characterised. The schedule remains on target for the first key decision point - site down selection in 2026.","narrativeClaimKind":null},{"id":"DECC_0005_1112-Q1","year":2024,"name":"Geological Disposal Facility Programme (GDF)","department":"DESNZ","category":"Infrastructure and Construction","description":"The primary objective of the programme is to site and construct a permanent geological disposal facility (GDF) as the safe, secure and environmentally responsible solution to the long term management of higher activity radioactive waste in the UK excluding Scotland. A GDF is the internationally agreed and only viable permanent answer to the UK's existing legacy of Highly radioactive waste. As a nationally significant infrastructure programme a GDF will also provide an opportunity to sustainably boost the economy of the host region and local community to transform itself for many generations. The programme also supports the delivery of the UK's nuclear new build programme as the Government needs to be satisfied that effective arrangements exist or will exist to manage and dispose of the wastes they will produce before development consents for new nuclear power stations are granted.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The DCA of amber reflects the uncertainty in the project at this time. There is still considerable uncertainty with the site locations, associated geology and technical feasibility as the programme moves towards the next phase as communities are selected to move to detailed site investigations or exited from the process. The programme continues to make good progress within this phase of community engagement and site evaluation across the main factors of willing community, suitable site and programme deliverability, in line with the Working With Communities Policy with the 3 existing Community Partnerships.","startDate":"2008-06-30","endDate":"2050-03-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2050-03-31. This is primarily due to the following factors. The indicative project end date is that given for the First Waste Emplacement of legacy radioactive waste in the facility, aligned to the Tranche 3 sub programme business case; this includes updated timescales in the securing of willing communities, a better understanding of the full scope of work to characterise the sites through the drilling of deep geological boreholes and associated consents and permissions and a level of schedule risk and uncertainty. It should be noted that the programme continues to face considerable uncertainties at this stage due to the site selection process; confidence will increase as the potential site locations are down selected and fully characterised. The schedule remains on target for the first key decision point - selection of preferred site(s) in 2026.","fyBaseline":52.12,"fyForecast":52.12,"fyVariance":0.0,"varianceNarrative":"The budget variance is inferior or equal to 5%.","wholeLifeCost":20300.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 remained at 20300m. This is primarily due to the following factors. The whole life costs align with those approved in the Programme Level Business Case (at 17/18 money values). The WLCs presented in the GMPP report cover both the HMG & non-HMG costs to the programme and are the lower bound estimate within the business case. The lower bound 20.3bn covers the lower possible technical complexity of the GDF site construction and includes provision for legacy waste, waste from new nuclear (16GWe) and other potential materials. The upper bound of the business case 53.3bn includes for higher technical complexity in the GDF construction site, contingency, optimism bias and uncertainty. As we move to preferred sites the level of uncertainty will significantly reduce.","benefits":0.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 0m. As a nationally significant infrastructure project which will span decades, a GDF will also provide a unique opportunity to sustainably boost the economy of the host region and local community to transform itself for many generations. The benefits of a GDF are wide-ranging and will span many future generations, they fall into four main categories: 1. It is an essential environmental protection project - finally disposing of legacy radioactive waste and providing a safe, permanent solution. 2. Enabling the completion of the NDA decommissioning mission across the NDA Group and in particular Sellafield - avoiding the very significant costs and risks of keeping the waste safe and secure in storage facilities above ground for many thousands of years. 3. A key enabler for nuclear new build - contributing to the British Energy Security Strategy and net-zero 2050 . 4. Significant host community benefits - a transformational opportunity by creating thousands of jobs, a highly skilled local workforce, and business opportunities for more than 100 years as presented in the GDF - Creating Jobs & Skills report as well infrastructure investment and community support.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Technical & integration"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The DCA of amber reflects the uncertainty in the project at this time. There is still considerable uncertainty with the site locations, associated geology and…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2050-03-31. This is primarily due to the following factors. The indicative project end date is that given for the First Waste Emplacement of legacy radioactive waste in the facility, aligned to the Tranche 3 sub programme business case; this includes updated timescales in the securing of willing communities, a better understanding of the full scope of work to characterise the sites through the drilling of deep geological boreholes and associated consents and permissions and a level of schedule risk and uncertainty. It should be noted that the programme continues to face considerable uncertainties at this stage due to the site selection process; confidence will increase as the potential site locations are down selected and fully characterised. The schedule remains on target for the first key decision point - selection of preferred site(s) in 2026.","narrativeClaimKind":null},{"id":"DECC_0005_1112-Q1","year":2025,"name":"GEOLOGICAL DISPOSAL FACILITY","department":"DESNZ","category":"Infrastructure and Construction","description":"The primary objective of the programme is to site and construct a permanent geological disposal facility (GDF) as the safe, secure and environmentally responsible solution to the long term management of higher activity radioactive waste in the UK excluding Scotland. A GDF is the internationally agreed and only viable permanent answer to the UK’s existing legacy of Highly radioactive waste. As a nationally significant infrastructure programme a GDF will also provide an opportunity to sustainably boost the economy of the host region and local community to transform itself for many generations. The programme also supports the delivery of the UK’s nuclear new build programme as the Government needs to be satisfied that effective arrangements exist or will exist to manage and dispose of the wastes they will produce before development consents for new nuclear power stations are granted.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 changed from AMBER to RED. This is primarily due to the following factors‚ The IPA review during January 25, and associated RED rating, reflects the unaffordability of the GDF Programme, with particular reference to the Preparations for Detailed Site Investigations OBC in respect of the forecast financial case and the 25/26 SR settlement. The programme continues to progress and will update the delivery plan to take account of the outcome of the upcoming Spending Review, protecting as far possible, the critical path, reducing uncertainty and mitigating the key risks. The four key programme objectives continue to be delivered by the programme.","startDate":"2008-06-30","endDate":"2050-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2050. This is primarily due to the following factors‚ There is no change at the end of 24/25 to the current forecast project end date. The programme continues to reduce uncertainties of delivery. The critical path has been held following the 25/26 SR settlement through prioritisation of activities.","fyBaseline":83.33,"fyForecast":75.19,"fyVariance":9.77,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ A number of factors have reduced the spend against budget for the year, these include 1) a decision to postpone the establishment of a further working group, 2) uncertainty & risk associated with one of the communities staying in the process and hence deferral of significant long term financial commitments 3) slow down in procurement activities based on reduced SR budget funding for 25/26 and projected future flat line SR funding and 4) slow down in recruitment (internal staff costs) to align with 25/26 SR settlement and anticipated overall budget reduction in the SR period.","wholeLifeCost":null,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 20300. This is primarily due to the following factors‚ There is currently no change to the Whole Life Cost Range for the programme which is £20.3bn to £53.3bn (2017/18 money values). This range reflects the uncertainty of the programme associated with potential host site, geology and technical requirements. The impacts of the Spending Review and other changes will be reflected in an update to the Programme Level Business Case during early 2026.","benefits":null,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ As a nationally significant infrastructure project which will span decades, a GDF will also provide a unique opportunity to sustainability boost the economy of the host region and local community to transform itself for many generations. The benefits of a GDF are wide-ranging and will span many future generations, they all into four main categories: 1) It is an essential environmental protection project – finally disposing of legacy radioactive waste and providing a safe permanent solution. 2) Enabling the completion of the NDA decommissioning mission across the NDA Group and in particular Sellafield – avoiding the very significant costs and risks of keeping the waste safe and secure in storage facilities above ground for many thousands of years. 3) A key enabler for nuclear new build – contributing to the British Energy Security Strategy & Net Zero 2050. 4) Significant host community benefits – transformational opportunity by creating thousands of jobs, a highly skilled local workforce, and business opportunities for more than 100 years as presented in the GDF – Creatin Jobs & Skills report as well infrastructure investment and community support. The short-term community benefits continue to be delivered with over £12m of grant funding awarded across the Community Partnerships. In the next phase, the preferred site(s) will become eligible for annual grant awards of £2.5m per CP (Q1 26/27).","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 changed from AMBER to RED. This is primarily due to the following factors‚ The IPA review during January 25, and associated RED rating, reflects the unaffordability of the GDF Programme, with particular reference to the Preparations…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2050. This is primarily due to the following factors‚ There is no change at the end of 24/25 to the current forecast project end date. The programme continues to reduce uncertainties of delivery. The critical path has been held following the 25/26 SR settlement through prioritisation of activities.","narrativeClaimKind":null},{"id":"DECC_0005_1112-Q1","year":2026,"name":"GEOLOGICAL DISPOSAL FACILITY","department":"DESNZ","category":"Infrastructure and Construction","description":"A GDF provides an internationally recognised, safe, and permanent solution for the UK’s most hazardous radioactive waste. As a nationally significant infrastructure programme a GDF will also provide an opportunity to sustainably boost the local economy of the host community to transform itself for many generations. The programme also supports the delivery of the UK’s nuclear new build programme.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 the NISTA Delivery confidence assessment (DCA) rating at 25/26 remained at 'Red'. This is primarily due to the following factors, withdrawal of one of the remaining three community partnerships reducing the portfolio diversity, outcome of the full spending review settlement resulting in reduced programme scope delivery over the next few years and deferral of critical path activities in the move to the next phase. An action plan is in place to address the next steps as identified.","startDate":"2008-06-12","endDate":null,"scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date remains in the range 2050-2060. This is primarily due to the following factors‚ the programme has continued to progress the site evaluation and community willingness activities during 25/26. The programme continues to prioritise activities in line with the available SR settlement funding.","fyBaseline":90.86,"fyForecast":71.13,"fyVariance":21.71,"varianceNarrative":"The in-year budget variance this year is greater than minus 5% compared to the budget with underspend due to the outcome of the spending review settlement for 25/26 and further requests for budget reduction in line with other NDA group prioritisation and efficiencies. The main variance to the budget spend in year was due closure of the Theddlethorpe Community Partnership in June 2025. Further reductions in internal spend were due to mutually agreed voluntary exit and associated slowdown in external spend to align with the overall SR settlement.","wholeLifeCost":null,"costNarrative":"The project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) remains in the range of £20,300m to £53,300m at 17/18 money values. This is primarily due to the following factors: the programme is at an early stage of development, and the range reflects the uncertainty of the programme associated with potential host site, geology and technical requirements.","benefits":null,"benefitsNarrative":"As the programme is at such an early stage there are currently no baselined monetised benefits. The benefits of a GDF are wide-ranging and will span many future generations, they all into four main categories: 1) It is an essential environmental protection project – finally disposing of legacy most hazardous radioactive waste and providing a safe permanent solution. 2) Enabling the completion of the NDA decommissioning mission across the NDA Group – avoiding the very significant costs and risks of keeping the waste safe and secure in storage facilities above ground for many thousands of years. 3) An enabler for nuclear new build. 4) Significant host community benefits – transformational opportunity by creating thousands of jobs, a highly skilled local workforce, and business opportunities for more than 100 years. The near-term community benefits continue to be delivered with over £14m of Community Investment funding awarded across the Community Partnerships formed to date.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 the NISTA Delivery confidence assessment (DCA) rating at 25/26 remained at 'Red'. This is primarily due to the following factors, withdrawal of one of the remaining three community partnerships reducing the portfolio diversity, outcome of the full spending review settlement resulting in reduced programme scope delivery over…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end-date remains in the range 2050-2060. This is primarily due to the following factors‚ the programme has continued to progress the site evaluation and community willingness activities during 25/26. The programme continues to prioritise activities in line with the available SR settlement funding.","narrativeClaimKind":null}],"previous":{"id":"DECC_0005_1112-Q1","year":2025,"name":"GEOLOGICAL DISPOSAL FACILITY","department":"DESNZ","category":"Infrastructure and Construction","description":"The primary objective of the programme is to site and construct a permanent geological disposal facility (GDF) as the safe, secure and environmentally responsible solution to the long term management of higher activity radioactive waste in the UK excluding Scotland. A GDF is the internationally agreed and only viable permanent answer to the UK’s existing legacy of Highly radioactive waste. As a nationally significant infrastructure programme a GDF will also provide an opportunity to sustainably boost the economy of the host region and local community to transform itself for many generations. The programme also supports the delivery of the UK’s nuclear new build programme as the Government needs to be satisfied that effective arrangements exist or will exist to manage and dispose of the wastes they will produce before development consents for new nuclear power stations are granted.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 changed from AMBER to RED. This is primarily due to the following factors‚ The IPA review during January 25, and associated RED rating, reflects the unaffordability of the GDF Programme, with particular reference to the Preparations for Detailed Site Investigations OBC in respect of the forecast financial case and the 25/26 SR settlement. The programme continues to progress and will update the delivery plan to take account of the outcome of the upcoming Spending Review, protecting as far possible, the critical path, reducing uncertainty and mitigating the key risks. The four key programme objectives continue to be delivered by the programme.","startDate":"2008-06-30","endDate":"2050-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2050. This is primarily due to the following factors‚ There is no change at the end of 24/25 to the current forecast project end date. The programme continues to reduce uncertainties of delivery. The critical path has been held following the 25/26 SR settlement through prioritisation of activities.","fyBaseline":83.33,"fyForecast":75.19,"fyVariance":9.77,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ A number of factors have reduced the spend against budget for the year, these include 1) a decision to postpone the establishment of a further working group, 2) uncertainty & risk associated with one of the communities staying in the process and hence deferral of significant long term financial commitments 3) slow down in procurement activities based on reduced SR budget funding for 25/26 and projected future flat line SR funding and 4) slow down in recruitment (internal staff costs) to align with 25/26 SR settlement and anticipated overall budget reduction in the SR period.","wholeLifeCost":null,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 20300. This is primarily due to the following factors‚ There is currently no change to the Whole Life Cost Range for the programme which is £20.3bn to £53.3bn (2017/18 money values). This range reflects the uncertainty of the programme associated with potential host site, geology and technical requirements. The impacts of the Spending Review and other changes will be reflected in an update to the Programme Level Business Case during early 2026.","benefits":null,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ As a nationally significant infrastructure project which will span decades, a GDF will also provide a unique opportunity to sustainability boost the economy of the host region and local community to transform itself for many generations. The benefits of a GDF are wide-ranging and will span many future generations, they all into four main categories: 1) It is an essential environmental protection project – finally disposing of legacy radioactive waste and providing a safe permanent solution. 2) Enabling the completion of the NDA decommissioning mission across the NDA Group and in particular Sellafield – avoiding the very significant costs and risks of keeping the waste safe and secure in storage facilities above ground for many thousands of years. 3) A key enabler for nuclear new build – contributing to the British Energy Security Strategy & Net Zero 2050. 4) Significant host community benefits – transformational opportunity by creating thousands of jobs, a highly skilled local workforce, and business opportunities for more than 100 years as presented in the GDF – Creatin Jobs & Skills report as well infrastructure investment and community support. The short-term community benefits continue to be delivered with over £12m of grant funding awarded across the Community Partnerships. In the next phase, the preferred site(s) will become eligible for annual grant awards of £2.5m per CP (Q1 26/27).","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 changed from AMBER to RED. This is primarily due to the following factors‚ The IPA review during January 25, and associated RED rating, reflects the unaffordability of the GDF Programme, with particular reference to the Preparations…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2050. This is primarily due to the following factors‚ There is no change at the end of 24/25 to the current forecast project end date. The programme continues to reduce uncertainties of delivery. The critical path has been held following the 25/26 SR settlement through prioritisation of activities.","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":null,"attentionScore":42,"attentionReasons":["Current published delivery confidence is Red","In-year forecast variance is +21.7%"]},{"id":"MOD_0011_2122-Q2","year":2026,"name":"SUBMARINE WATERFRONT INFRASTRUCTURE FUTURE","department":"MOD","category":"Infrastructure and Construction","description":"The Submarine Waterfront Infrastructure Future project is investing £2Bn+ in infrastructure at Devonport to support the maintenance of the Royal Navy’s Astute Class nuclear-powered submarines. The facilities being provided include a new non-tidal maintenance berth, a repurposed dry dock, and associated buildings and services.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Red. This is primarily due to the following factors. 1. Despite positive progress, there are still many challenges in the delivery environment which will prevent completion within the approved time and cost envelope. 2. The main focus across the projects continues to be design completion, recent interventions have been targeted at pace of design decision making and proportionate approvals. 3. Whilst DCA remains Red there are early positive signs of the interventions, and the leadership are focussed on embedding these targeted interventions into normal business. 4. Significant levels of risk/uncertainty in the programme remain with a reset underway.","startDate":"2016-12-31","endDate":"2031-05-21","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remains undetermined. The programme will be reset during FY26.","fyBaseline":467.37,"fyForecast":384.65,"fyVariance":17.7,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. 1. There has been significant in-year fade from Q1 25/26. This is primarily caused by a change in the procurement strategy of the berth, in order to mitigate a number of key construction risks, which has delayed the start of construction activities in year. 2. Future years forecasts have factored this in, combined with the MOD planning cycle submission.","wholeLifeCost":2230.52,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) decreased from £2190.70M to £2066.20M. This is primarily due to the following factors. 1. The programme is managing its Whole Life Costs in conjunction with the MOD's Strategic Planning Cycle. 2. The estimated Whole Life Costs adjustment down is now taking into account a revised financial profile driven by a reduced funding provision in the early years of the Annual Budgetary Cycle. 3. The programme required a substantial reset. This will see increased confidence in the cost estimates and forecasts.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Delivery & schedule","Scope & requirements","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Red. This is primarily due to the following factors. 1. Despite positive progress, there are still many challenges in the delivery environment which will prevent completion within the approved time and cost envelope. 2. The main focus…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remains undetermined. The programme will be reset during FY26.","narrativeClaimKind":null,"history":[{"id":"MOD_0011_2122-Q2","year":2022,"name":"Submarine Waterfront Infrastructure Future","department":"MOD","category":"Infrastructure and Construction","description":"The Submarine Waterfront Infrastructure Future project is investing in infrastructure at Devonport to support the maintenance of the Royal Navy's Astute Class nuclear-powered submarines. The facilities being provided include a new non-tidal berth and a refurbished dry dock.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure and Project Authority's Delivery Confidence Assessment rating is Amber. This is primarily due to the following factors: The Submarine Waterfront Infrastructure Future project underwent its first Infrastructure and Projects Authority Review in March 2022 which assessed the project as Amber with \"a clear pathway to Green\". The review observed that, \"the project team, scope, plan, risks, costs, schedule and contract approach are maturing well, with evidence they will continue to do so\".","startDate":"2016-12-31","endDate":"2028-12-15","scheduleNarrative":"The project end-date is 15 December 2028. This is primarily due to the following factors: The Programme entered the Government Major Projects Portfolio in Financial Year 2021/22, as such there is no baseline date recorded for March 21 for comparison.","fyBaseline":110.87,"fyForecast":110.87,"fyVariance":0.0,"varianceNarrative":"The budget variance is inferior or equal to 5%.","wholeLifeCost":448.0,"costNarrative":"The projects Baseline Whole Life Cost is 447.67 (£m). This is primarily due to the following factors: Funding is to the end of the Programme Assessment Phase only.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Commercial & supply chain"],"evidenceExcerpt":"The Infrastructure and Project Authority's Delivery Confidence Assessment rating is Amber. This is primarily due to the following factors: The Submarine Waterfront Infrastructure Future project underwent its first Infrastructure and Projects Authority Review in March 2022 which assessed the project as Amber with \"a clear pathway to Green\". The review…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project end-date is 15 December 2028. This is primarily due to the following factors: The Programme entered the Government Major Projects Portfolio in Financial Year 2021/22, as such there is no baseline date recorded for March 21 for comparison.","narrativeClaimKind":null},{"id":"MOD_0011_2122-Q2","year":2023,"name":"Submarine Waterfront Infrastructure Future","department":"MOD","category":"Infrastructure and Construction","description":"The Submarine Waterfront Infrastructure Future project is investing in infrastructure at Devonport to support the maintenance of the Royal Navy's Astute Class nuclear-powered submarines. The facilities being provided include a new non-tidal maintenance berth, a refurbished dry dock and supporting buildings and services.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber (SRO rating). This is primarily due to the following factors. As the project transitions into full construction, it remains exposed to a number of risks in the delivery environment outside the project's immediate control.","startDate":"2016-12-31","endDate":"2027-10-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 decreased from 2028-12-15 to 2027-10-31. This is primarily due to the following factors. The previously reported end-date was for completion of the project assessment phase. The end-date reported now is the construction completion dateapproved at Full Business Case.","fyBaseline":182.95,"fyForecast":191.7,"fyVariance":5.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This programme does not report cashable benefits. Its aim is to provision the armed forces with the equipment and / or infrastructure required.","themes":["Delivery & schedule","Cost & funding","Commercial & supply chain","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber (SRO rating). This is primarily due to the following factors. As the project transitions into full construction, it remains exposed to a number of risks in the delivery environment outside the project's immediate control. Compared to financial year…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 decreased from 2028-12-15 to 2027-10-31. This is primarily due to the following factors. The previously reported end-date was for completion of the project assessment phase. The end-date reported now is the construction completion dateapproved at Full Business Case.","narrativeClaimKind":null},{"id":"MOD_0011_2122-Q2","year":2024,"name":"Submarine Waterfront Infrastructure Future","department":"MOD","category":"Infrastructure and Construction","description":"The Submarine Waterfront Infrastructure Future project is investing £2Bn+ in infrastructure at Devonport to support the maintenance of the Royal Navy’s Astute Class nuclear-powered submarines. The facilities being provided include a new non-tidal maintenance berth, a repurposed dry dock, and associated buildings and services.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remains at Amber. This is primarily due to the following factors. Designs have matured, demolition and site preparation have continued, and all contracts for the main construction works have been placed. Timely completion now depends on achieving the required pace in construction, which remains exposed to significant risks in the delivery environment. 2024 is a critical year for SWIF.","startDate":"2016-12-31","endDate":"2027-10-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the programme's end-date at 23/24-Q4 remained scheduled to finish on 2027-10-31.","fyBaseline":330.0,"fyForecast":330.0,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%","wholeLifeCost":1428.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 23/24-Q4 is 1428m. This is primarily due to the following factors. Final construction contracts awarded and a maturing view on costs informed by design development and engagement with the wider supply chain.","benefits":0.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 0m.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remains at Amber. This is primarily due to the following factors. Designs have matured, demolition and site preparation have continued, and all contracts for the main construction works have been placed. Timely completion now depends on…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 22/23-Q4, the programme's end-date at 23/24-Q4 remained scheduled to finish on 2027-10-31.","narrativeClaimKind":null},{"id":"MOD_0011_2122-Q2","year":2025,"name":"SUBMARINE WATERFRONT INFRASTRUCTURE FUTURE","department":"MoD","category":"Infrastructure and Construction","description":"The Submarine Waterfront Infrastructure Future project is investing £2Bn+ in infrastructure at Devonport to support the maintenance of the Royal Navy’s Astute Class nuclear-powered submarines. The facilities being provided include a new non-tidal maintenance berth, a repurposed dry dock, and associated buildings and services.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is RED, compared with the project's assessment last year of AMBER. This is due to the following factors. The main focus through the year has been design. Velocity has not been as forecast owing to a backlog of approving/closing out design packages at the end of each phase. There has been key interventions in simplifying design in year and initiatives are underway to reduce the backlog, both of which will enable the transition to construction. Actions are ongoing to recover the delivery confidence, mature the design and reduce the significant levels of risk/uncertainty in the programme. This will culminate in a reset during financial year 2025.","startDate":"2016-12-31","endDate":null,"scheduleNarrative":"The project's end-date at 24/25-Q4 is exempt. This is primarily due to the following factors. The programme will undergo a reset during financial year 2025. The Baseline to be set following approval of the Supplier Commitment Schedule, which will outline the agreed delivery timelines, quantity of materials and services provided by the supplier.","fyBaseline":536.37,"fyForecast":382.82,"fyVariance":28.63,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The In-Year variance is caused by delays in design completion and therefore a later transition to construction.","wholeLifeCost":null,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 1428 to 2190. This is primarily due to the following factors. The programme is managing its whole life cost (WLC) in conjunction with the MOD's Annual Budgetary Cycle. Confidence in the WLC will be a critical outcome of the programme reset.","benefits":null,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Scope & requirements","Delivery & schedule","Commercial & supply chain"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is RED, compared with the project's assessment last year of AMBER. This is due to the following factors. The main focus through the year has been design. Velocity has not been as forecast owing to a backlog of approving/closing out design packages at the end of each…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 24/25-Q4 is exempt. This is primarily due to the following factors. The programme will undergo a reset during financial year 2025. The Baseline to be set following approval of the Supplier Commitment Schedule, which will outline the agreed delivery timelines, quantity of materials and services provided by the supplier.","narrativeClaimKind":null},{"id":"MOD_0011_2122-Q2","year":2026,"name":"SUBMARINE WATERFRONT INFRASTRUCTURE FUTURE","department":"MOD","category":"Infrastructure and Construction","description":"The Submarine Waterfront Infrastructure Future project is investing £2Bn+ in infrastructure at Devonport to support the maintenance of the Royal Navy’s Astute Class nuclear-powered submarines. The facilities being provided include a new non-tidal maintenance berth, a repurposed dry dock, and associated buildings and services.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Red. This is primarily due to the following factors. 1. Despite positive progress, there are still many challenges in the delivery environment which will prevent completion within the approved time and cost envelope. 2. The main focus across the projects continues to be design completion, recent interventions have been targeted at pace of design decision making and proportionate approvals. 3. Whilst DCA remains Red there are early positive signs of the interventions, and the leadership are focussed on embedding these targeted interventions into normal business. 4. Significant levels of risk/uncertainty in the programme remain with a reset underway.","startDate":"2016-12-31","endDate":"2031-05-21","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remains undetermined. The programme will be reset during FY26.","fyBaseline":467.37,"fyForecast":384.65,"fyVariance":17.7,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. 1. There has been significant in-year fade from Q1 25/26. This is primarily caused by a change in the procurement strategy of the berth, in order to mitigate a number of key construction risks, which has delayed the start of construction activities in year. 2. Future years forecasts have factored this in, combined with the MOD planning cycle submission.","wholeLifeCost":2230.52,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) decreased from £2190.70M to £2066.20M. This is primarily due to the following factors. 1. The programme is managing its Whole Life Costs in conjunction with the MOD's Strategic Planning Cycle. 2. The estimated Whole Life Costs adjustment down is now taking into account a revised financial profile driven by a reduced funding provision in the early years of the Annual Budgetary Cycle. 3. The programme required a substantial reset. This will see increased confidence in the cost estimates and forecasts.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Delivery & schedule","Scope & requirements","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Red. This is primarily due to the following factors. 1. Despite positive progress, there are still many challenges in the delivery environment which will prevent completion within the approved time and cost envelope. 2. The main focus…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remains undetermined. The programme will be reset during FY26.","narrativeClaimKind":null}],"previous":{"id":"MOD_0011_2122-Q2","year":2025,"name":"SUBMARINE WATERFRONT INFRASTRUCTURE FUTURE","department":"MoD","category":"Infrastructure and Construction","description":"The Submarine Waterfront Infrastructure Future project is investing £2Bn+ in infrastructure at Devonport to support the maintenance of the Royal Navy’s Astute Class nuclear-powered submarines. The facilities being provided include a new non-tidal maintenance berth, a repurposed dry dock, and associated buildings and services.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is RED, compared with the project's assessment last year of AMBER. This is due to the following factors. The main focus through the year has been design. Velocity has not been as forecast owing to a backlog of approving/closing out design packages at the end of each phase. There has been key interventions in simplifying design in year and initiatives are underway to reduce the backlog, both of which will enable the transition to construction. Actions are ongoing to recover the delivery confidence, mature the design and reduce the significant levels of risk/uncertainty in the programme. This will culminate in a reset during financial year 2025.","startDate":"2016-12-31","endDate":null,"scheduleNarrative":"The project's end-date at 24/25-Q4 is exempt. This is primarily due to the following factors. The programme will undergo a reset during financial year 2025. The Baseline to be set following approval of the Supplier Commitment Schedule, which will outline the agreed delivery timelines, quantity of materials and services provided by the supplier.","fyBaseline":536.37,"fyForecast":382.82,"fyVariance":28.63,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The In-Year variance is caused by delays in design completion and therefore a later transition to construction.","wholeLifeCost":null,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 1428 to 2190. This is primarily due to the following factors. The programme is managing its whole life cost (WLC) in conjunction with the MOD's Annual Budgetary Cycle. Confidence in the WLC will be a critical outcome of the programme reset.","benefits":null,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Scope & requirements","Delivery & schedule","Commercial & supply chain"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is RED, compared with the project's assessment last year of AMBER. This is due to the following factors. The main focus through the year has been design. Velocity has not been as forecast owing to a backlog of approving/closing out design packages at the end of each…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 24/25-Q4 is exempt. This is primarily due to the following factors. The programme will undergo a reset during financial year 2025. The Baseline to be set following approval of the Supplier Commitment Schedule, which will outline the agreed delivery timelines, quantity of materials and services provided by the supplier.","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":null,"attentionScore":41,"attentionReasons":["Current published delivery confidence is Red","In-year forecast variance is +17.7%"]},{"id":"DESNZ_0542_2526-Q2","year":2026,"name":"Warm Homes Agency","department":"DESNZ","category":"Government Transformation and Service Delivery","description":"Project is to establish the Warm Homes Agency (WHA) – a dedicated public body to support the delivery of the Warm Homes Plan, and guide consumers through the transition.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"The SRO Delivery Confidence Assessment (DCA) rating at 2025/26 Q4 is Red. The project is operating within a changed organisational context and is undertaking replanning work to ensure that delivery plans remain realistic and achievable within available resources, while prioritising key activities such as the necessary Primary Legislation.","startDate":"2024-07-08","endDate":"2027-12-31","scheduleNarrative":"The project joined the GMPP in 25/26. The expected project end date is currently 31/12/2027 but this is subject to replanning which is taking place over May to August 2026.","fyBaseline":7.8,"fyForecast":6.49,"fyVariance":16.77,"varianceNarrative":"The financial year forecast comes 16.77% under the baseline figure for 2025/26. This variance is primarily driven by two factors. First, updated estimates for resource support required to transition existing delivery bodies into the new agency are lower than initially forecast, following refinement of assumptions and commercial engagement. Second, expenditure on digital and IT activities in 2025/26 is lower than planned due to the discovery phase progressing over a longer period than initially anticipated. As a result, costs associated with system transition and implementation are now expected to be incurred in 2026/27.","wholeLifeCost":276.69,"costNarrative":"The Whole Life Costs figure (converted to real prices with base year 24/25) consists of resource costs for 25/26 to 28/29 and capital costs for 25/26 to 29/30, which are subject to funding. The resource costs are the costs to be incurred in establishing the agency, which includes set-up, implementation and transition costs. The capital portion of the whole life cost is made up of the capital required to transition existing IT systems over to the new agency, as well as creating new IT systems.","benefits":null,"benefitsNarrative":"The Warm Homes Agency is a key enabler of our Warm Homes Plan, designed to drive consumer demand for warmer, greener homes whilst galvanising the supply chain and coordinating delivery across the UK. By bringing together some schemes as well as advisory and assurance services currently split across DESNZ, Ofgem, and Salix, we are creating a clearer, more efficient system for households and taxpayers alike. As the scope is still being refined (subject to ministerial approval) full benefit quantification is not possible at this stage.","themes":["Cost & funding","Delivery & schedule","Workforce & capability","Commercial & supply chain"],"evidenceExcerpt":"The SRO Delivery Confidence Assessment (DCA) rating at 2025/26 Q4 is Red. The project is operating within a changed organisational context and is undertaking replanning work to ensure that delivery plans remain realistic and achievable within available resources, while prioritising key activities such as the necessary Primary Legislation. The project joined…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project joined the GMPP in 25/26. The expected project end date is currently 31/12/2027 but this is subject to replanning which is taking place over May to August 2026.","narrativeClaimKind":null,"history":[{"id":"DESNZ_0542_2526-Q2","year":2026,"name":"Warm Homes Agency","department":"DESNZ","category":"Government Transformation and Service Delivery","description":"Project is to establish the Warm Homes Agency (WHA) – a dedicated public body to support the delivery of the Warm Homes Plan, and guide consumers through the transition.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"The SRO Delivery Confidence Assessment (DCA) rating at 2025/26 Q4 is Red. The project is operating within a changed organisational context and is undertaking replanning work to ensure that delivery plans remain realistic and achievable within available resources, while prioritising key activities such as the necessary Primary Legislation.","startDate":"2024-07-08","endDate":"2027-12-31","scheduleNarrative":"The project joined the GMPP in 25/26. The expected project end date is currently 31/12/2027 but this is subject to replanning which is taking place over May to August 2026.","fyBaseline":7.8,"fyForecast":6.49,"fyVariance":16.77,"varianceNarrative":"The financial year forecast comes 16.77% under the baseline figure for 2025/26. This variance is primarily driven by two factors. First, updated estimates for resource support required to transition existing delivery bodies into the new agency are lower than initially forecast, following refinement of assumptions and commercial engagement. Second, expenditure on digital and IT activities in 2025/26 is lower than planned due to the discovery phase progressing over a longer period than initially anticipated. As a result, costs associated with system transition and implementation are now expected to be incurred in 2026/27.","wholeLifeCost":276.69,"costNarrative":"The Whole Life Costs figure (converted to real prices with base year 24/25) consists of resource costs for 25/26 to 28/29 and capital costs for 25/26 to 29/30, which are subject to funding. The resource costs are the costs to be incurred in establishing the agency, which includes set-up, implementation and transition costs. The capital portion of the whole life cost is made up of the capital required to transition existing IT systems over to the new agency, as well as creating new IT systems.","benefits":null,"benefitsNarrative":"The Warm Homes Agency is a key enabler of our Warm Homes Plan, designed to drive consumer demand for warmer, greener homes whilst galvanising the supply chain and coordinating delivery across the UK. By bringing together some schemes as well as advisory and assurance services currently split across DESNZ, Ofgem, and Salix, we are creating a clearer, more efficient system for households and taxpayers alike. As the scope is still being refined (subject to ministerial approval) full benefit quantification is not possible at this stage.","themes":["Cost & funding","Delivery & schedule","Workforce & capability","Commercial & supply chain"],"evidenceExcerpt":"The SRO Delivery Confidence Assessment (DCA) rating at 2025/26 Q4 is Red. The project is operating within a changed organisational context and is undertaking replanning work to ensure that delivery plans remain realistic and achievable within available resources, while prioritising key activities such as the necessary Primary Legislation. The project joined…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project joined the GMPP in 25/26. The expected project end date is currently 31/12/2027 but this is subject to replanning which is taking place over May to August 2026.","narrativeClaimKind":null}],"previous":null,"ratingDelta":null,"transition":"Not comparable","endDateDeltaDays":null,"attentionScore":41,"attentionReasons":["Current published delivery confidence is Red","In-year forecast variance is +16.8%"]},{"id":"BIS_0015_1516-Q1","year":2026,"name":"LOCAL LAND CHARGES (LLC) PROGRAMME","department":"HMLR","category":"Government Transformation and Service Delivery","description":"The Local Land Charges (LLC) Programme is transforming a fragmented, inefficient service currently delivered by local authorities (LAs) to a single national, digital register across England and Wales. LLCs are generally restrictions or prohibitions on the use of land, such as planning consents or tree preservation order, which binds successive owners and occupiers. This information is obtained as part of LA searches completed in the property buying process and is integral to the purchasers’ investment decision.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the need for proven end to end delivery at scale by external suppliers, which will be proven in 2026, and external dependencies the programme manage on a case by case basis.","startDate":"2014-03-01","endDate":"2028-12-29","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 increased from 31/03/2027 to 29/12/2028. This is primarily due to a better understanding of delivery length assumptions, and completion of detailed programme delivery planning. This remains in line with the refreshed LLC Full Business Case.","fyBaseline":35.9,"fyForecast":33.6,"fyVariance":6.41,"varianceNarrative":"Programme in year underspend is related to delivery. Current delivery schedules are extended, resulting in increased spend in latter programme years.","wholeLifeCost":346.22,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 remained the same. Following HMT FBC approval, revised baselines will be forecasted.","benefits":8221.01,"benefitsNarrative":"No changes to agreed benefit baselines until programme Monitoring & Evaluation Phase 3 completes in 2027. Current benefit realisation on track.","themes":["Delivery & schedule","Cost & funding","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the need for proven end to end delivery at scale by external suppliers, which will be proven in 2026, and external dependencies the programme manage on a case by case basis. Compared to financial year 24/25-Q4, the…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 increased from 31/03/2027 to 29/12/2028. This is primarily due to a better understanding of delivery length assumptions, and completion of detailed programme delivery planning. This remains in line with the refreshed LLC Full Business Case.","narrativeClaimKind":null,"history":[{"id":"BIS_0015_1516-Q1","year":2020,"name":"Local Land Charges (LLC) Programme","department":"BEIS","category":"ICT","description":"The Programme will deliver a single Local Land Charges (LLC) Service for England.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber, which has not changed since last year�s Q2 1819 Amber, due primarily to the following factors; - The Programme has reached a pivotal point in its delivery as it moves towards the end of Phase 1. There are important tools in production including the register and migration readiness tools and a commercial agreement with a digitisation supplier. All augers well for delivery of the overall programme. - However, the Programme is still in the learning phase and it needs to guard against the desire to prioritise delivery of Local Authority (LA) migrations over future design and learning. - A change of focus on the outcomes from Phase 1, a concentration on the development of useful metrics and the time and space to examine alternate options will give greater confidence that the Programme will deliver its overall objectives and maximise the benefits to UK PLC. Since the Q2 1920 (30th September 2019) Amber IPA DCA, the following non-project operating environment activities have impacted the original Q2 IPA DCA; - The uncertainty around EU Exit timings and restricted activities in a pre-election period impacted local authority and potential supplier engagement activities and progress. Since the Q2 1920 (30th September 2019) Amber IPA DCA, the following primary project actions have impacted the original Q2 IPA DCA; - As a result of learning to date, the Programme adapted its approach to focus on pre-migration activity, including early data analysis and engagement with LAs. This enabled a richer understanding of the migration challenges and timelines. - The Programme has developed and consulted on a new delivery model which forms the basis of the new business case. This better aligns with the desired outcomes for the Programme, to unlock the economic benefits quicker. - The benefits model has been substantially revised to identify and quantify the wider economic benefits of the investment.","startDate":"2014-03-01","endDate":"2023-11-17","scheduleNarrative":"The scheduled baseline project end date at Q2 1920 (30th September 2019) is 17/11/23, has not changed since last year's Q2 1819 date of 17/11/23, due primarily to the following factors; - The current business case proposes extending Phase 1 for another year to put in place and test the delivery model. This will enable a more informed business case and delivery timeline to be developed. - The Programme is dependent on local authorities signing up for data analysis and migration. The refreshed pre-migration and early engagement strategies are designed to bring more LAs forward quicker. - Given the significant time to migrate an individual LA and the number of LAs, this Programme is likely to be a multi-year programme. Since the Q2 1920 (30th September 2019) baseline project end date of 17/11/23, the following non-project operating environment activities have impacted the original Q2 baseline project end date; - There is a reliance on local authorities (and/or their software suppliers) to be engaged and able to extract data from their current system, to feed into the early data analysis work. - This programme has a significant dependency on the LAs existing software suppliers to extract the data and transfer it to HMLR systems for analysis. As approval for the Programme is currently on an annual basis, suppliers are reluctant to investment in their systems to create more strategic and streamlined solutions. Since the Q2 1920 (30th September 2019) baseline project end date of 17/11/23, the following primary project actions have impacted the original Q2 baseline project end date; - Machine learning analytic tools, such as the Migration Helper, is already proving to reduce migration timelines, particularly for improving spatial data. - New delivery models have been designed to enable several local authorities to migrate concurrently and with more appropriate support. The engagement strategy, commercial strategy and internal team capabilities have been redesigned to align with this and speed up delivery.","fyBaseline":32.5,"fyForecast":7.0,"fyVariance":-78.0,"varianceNarrative":"The 19/20 in-year baseline / forecast variance at Q2 1920 (30th September 2019) of -78%, is due primarily to the following factors; - The baseline is based on the OBC approved in September 2015. The Programme has since submitted a full PBC, but due to general election delays, were advised in November 2017 to identify lower cost and more targeted solutions of migrating LAs. Since, funding has been on a phased basis. - The original approved Phase 1 spend was �15m to cover the 15 months to March 19 and at the end of this period HMLR was approved to extend the Phase 1 period to 19/20 to complete up to 16 Local Authorities. - Actual spend has been significantly below the OBC assumption which assumed the Programme would be in full flight with a significant number of suppliers on board and migrating c70 Local Authorities in 19/20. Since the Q2 1920 (30th September 2019) 19/20 in-year baseline / forecast variance of -78%, the following non-project operating environment activities have impacted the original Q2 19/20 in-year baseline / forecast variance; - Despite good progress being made in 19/20, LA migration was much slower than expected and the cumulative number of live migrated LAs at the end of March 20 was 9 compared to the forecast at Q2 of 15. Consequently, this has led to some lower costs e.g. LA burdens payments. - Actual spend with suppliers in 19/20 has also been lower than forecast at Q2 due to issues with LA data quality, the need for some work to be completed in house and also delays in signing contracts with some incumbent suppliers. Since the Q2 1920 (30th September 2019) 19/20 in-year baseline / forecast variance of -78%, the following primary project actions have impacted the original Q2 19/20 in-year variance; - Whilst unlikely to have a material impact in 19/20, the Programme has been working to design a new operating model, capable of increasing the pace of delivery while lowering costs i.e. industrialisation of the migration process. - The Programme has reflected on the learning from Phase 1 to date and has increased the amount of skilled and experience resource on the Programme specifically in the areas of pre-market engagement, plus additional Contract and Supplier Manager roles.","wholeLifeCost":193.3,"costNarrative":"The baseline Whole Life Cost at Q2 1920 (30th September 2019) is �193.30 m, has not changed since last year's Q2 1819 (�m) baseline Whole Life Cost of �193.30 m, due primarily to the following factors; - As mentioned in section 3, the baseline represents the last approved business case being the OBC from September 2015. Since then the Programme has submitted a full PBC, but this was not approved and therefore the Programme full life baseline has not been able to be refreshed. - The Programme funding approvals have been on a phased basis demonstrating lessons learnt over a smaller number of LAs. Since the Q2 1920 (30th September 2019) �193.30 m baseline Whole Life Cost, the following non-project operating environment activities have impacted the original baseline Q2 Whole Life Cost; - The baselines at Q2 were unchanged for the reasons outlined above. - The full assessment of the impact of Covid-19 on the delivery of the Programme and associated costs has yet to be undertaken. Since the Q2 1920 (30th September 2019) �193.30 m baseline Whole Life Cost, the following primary project actions have impacted the original Q2 baseline Whole Life Cost; - The Programme is looking to refine the time, costs and income estimates including delivery costs and potential sales volumes, based on a deeper understanding of the data in LAs and the steps required to improve it. - The work the Programme is undertaking now and into the next financial year will give greater clarity on the risks and opportunities to the costs, benefits and delivery approach in order to refresh the full PBC during late 2020.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Technical & integration","Delivery & schedule","Commercial & supply chain"],"evidenceExcerpt":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber, which has not changed since last year�s Q2 1819 Amber, due primarily to the following factors; - The Programme has reached a pivotal point in its delivery as it moves towards the end of Phase 1. There are important tools in production including the register and…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2020","sourceLabel":"IPA Annual Report 2019-20","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The scheduled baseline project end date at Q2 1920 (30th September 2019) is 17/11/23, has not changed since last year's Q2 1819 date of 17/11/23, due primarily to the following factors; - The current business case proposes extending Phase 1 for another year to put in place and test the delivery model. This will enable a more informed business case and delivery timeline to be developed. - The Programme is dependent on local authorities signing up for data analysis and migration. The refreshed pre-migration and early engagement strategies are designed to bring more LAs forward quicker. - Given the significant time to migrate an individual LA and the number of LAs, this Programme is likely to be a multi-year programme. Since the Q2 1920 (30th September 2019) baseline project end date of 17/11/23, the following non-project operating environment activities have impacted the original Q2 baseline project end date; - There is a reliance on local authorities (and/or their software suppliers) to be engaged and able to extract data from their current system, to feed into the early data analysis work. - This programme has a significant dependency on the LAs existing software suppliers to extract the data and transfer it to HMLR systems for analysis. As approval for the Programme is currently on an annual basis, suppliers are reluctant to investment in their systems to create more strategic and streamlined solutions. Since the Q2 1920 (30th September 2019) baseline project end date of 17/11/23, the following primary project actions have impacted the original Q2 baseline project end date; - Machine learning analytic tools, such as the Migration Helper, is already proving to reduce migration timelines, particularly for improving spatial data. - New delivery models have been designed to enable several local authorities to migrate concurrently and with more appropriate support. The engagement strategy, commercial strategy and internal team capabilities have been redesigned to align with this and speed up delivery.","narrativeClaimKind":null},{"id":"BIS_0015_1516-Q1","year":2021,"name":"Local Land Charges (LLC) Programme","department":"HMLR","category":"Government Transformation and Service Delivery","description":"Deliver a single Local Land Charges (LLC) Service for England and Wales, to provide a national resilient service with consistency of customer experience and fees.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating decreased from Amber to Amber/Green. This is primarily due to the following factors: The Programme delivered all of it's Business Case objectives for FY20/21. The operating model to scale up delivery is in place. This includes scaling up capability and capacity of the internal delivery team, aswell as concluding procurement to appoint new data and digitisation suppliers. The Engagement Strategy is proving successful with local authorities signing up for migration to the new service, enabling us to deliver the ambitious 4 year data migration timeframe. The Welsh Government has approved legislation to be part of the new service. The Programme doubled the number of local authorities migrated to the register, putting Covid contingency measures in place and adapting to new ways of working with stakeholders.","startDate":"2014-03-01","endDate":"2027-03-31","scheduleNarrative":"Compared to financial year 19/20-Q2, the project's end-date increased from 17 November 2023 to 31 March 2027 . This is primarily due to the following factors: The Programme has met all of it's objectives as defined in the current Business Case and has now agreed am ambitious but 4 year delivery plan with HM Treasury, which will bring the Programme end back back to 2025.","fyBaseline":32.5,"fyForecast":7.39,"fyVariance":-77.0,"varianceNarrative":"The budget variance exceeds 5%. The forecast spend has been less than predicted due to the ongoing impact of the Covid19 pandemic. Spend with external suppliers has also been lower due to extended procurement timelines whilst requirements were defined, resulting in data migration work being completed in-house to date.","wholeLifeCost":193.3,"costNarrative":"Compared to financial year 19/20-Q2, the projects Baseline Whole Life Cost remained at �193.30m. This is primarily due to the following factors: Whole life costs will be updated in line with our new Programme Business Case, currently going through the approvals process.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Technical & integration","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating decreased from Amber to Amber/Green. This is primarily due to the following factors: The Programme delivered all of it's Business Case objectives for FY20/21. The operating model to scale up delivery is in place. This includes scaling up…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 19/20-Q2, the project's end-date increased from 17 November 2023 to 31 March 2027 . This is primarily due to the following factors: The Programme has met all of it's objectives as defined in the current Business Case and has now agreed am ambitious but 4 year delivery plan with HM Treasury, which will bring the Programme end back back to 2025.","narrativeClaimKind":null},{"id":"BIS_0015_1516-Q1","year":2022,"name":"Local Land Charges (LLC) Programme","department":"HMLR","category":"Government Transformation and Service Delivery","description":"The Programme has met all of it's FY21/22 (Year 1) HM Treasury commitments as defined in the current Business Case. The 4 Year Delivery Plan has been refined to ensure delivery can be achieved within the ambitious timescales, which sees the Programme end in 2025.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"NA The Programme has delivered all of it's HM Treasury commitments for FY21/22 (Year 1) . The operating model is now embedded and has been independently assured. The HMLR internal delivery team is now working at full capacity and has been responsible for all delivery within this financial year, tripling the number of local authority (LA) migrations completed this year. Two digitisation suppliers have been procured and are now working collaboratively with internal delivery teams on their first LA migrations. Our Engagement Strategy continues to be successful, with 89% of all English LAs and all Welsh LAs signed up for data migration to the new service. Customer feedback on the live service remains incredibly popular.","startDate":"2014-03-01","endDate":"2027-03-31","scheduleNarrative":"Compared to 2021-Q4, your project end-date remained scheduled to finish on 31 MAR 2027 . This is primarily due to the following factors: The Programme now has an approved 4 Year Delivery Plan, seeing the end date brought back to 2025.","fyBaseline":42.55,"fyForecast":23.38,"fyVariance":-45.0,"varianceNarrative":"The budget variance exceeds 5%. This year's forecast spend has been lower than predicted due to delayed spend with external digitisation suppliers, whilst requirements were defined.","wholeLifeCost":331.0,"costNarrative":"Compared to2021-Q4, the projects Baseline Whole Life Cost increased from 193.30 (£m) to 331.19 (£m). This is primarily due to the following factors: Whole life costs for our refined Delivery Plan, remain within the overall cost envelope in the approved Business Case.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Technical & integration","Approvals & decisions"],"evidenceExcerpt":"NA The Programme has delivered all of it's HM Treasury commitments for FY21/22 (Year 1) . The operating model is now embedded and has been independently assured. The HMLR internal delivery team is now working at full capacity and has been responsible for all delivery within this financial year, tripling the number of local authority (LA) migrations…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to 2021-Q4, your project end-date remained scheduled to finish on 31 MAR 2027 . This is primarily due to the following factors: The Programme now has an approved 4 Year Delivery Plan, seeing the end date brought back to 2025.","narrativeClaimKind":null},{"id":"BIS_0015_1516-Q1","year":2023,"name":"Local Land Charges (LLC) Programme","department":"HMLR","category":"Government Transformation and Service Delivery","description":"Deliver a digital national Local Land Charges Register and service that covers all of England and Wales, thereby improving home buying through the digital service, with spatial data at its core. In-house delivered migrations are doing well and operating to plan, with the overall pace of delivery doubling year on year. The delivery plan has been refined, taking into account the successful onboarding of two Migration Service Delivery Partners.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 21/22-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. The programme is doing well with in-house delivered migrations operating to plan and the overall pace of delivery has effectively doubled year on year; however, the length of time taken by the suppliers to get up to speed has meant their contribution to overall volume is less than set out in the original FBC. An updated business case, which takes into account supplier performance, will go to ministers imminently this sets out how the programme will complete in line with the cost and benefits estimates of the original business case, but delivery will take an additional year.Recent recruitment campaigns in the Digitisation and Business Analysts Teams has brought stability in these areas, ensuring the Programme has the capacity and capability to meet delivery volumes.Additionally, the Programme won the 'Championing Continuous Improvement' award by Smarter Working Live for collaborative efforts to improve processes and speed of migration delivery.","startDate":"2014-03-01","endDate":"2027-03-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2027-03-31. This is primarily due to the following factors. The refreshed Business Case seeks approval to extend the delivery plan into a fifth year, FY25/26, following delays in the Migration Service Delivery Partners. There is no impact on the overall cost envelop, just movement of spend into FY25/26.","fyBaseline":50.25,"fyForecast":26.95,"fyVariance":-46.0,"varianceNarrative":"The budget variance exceeds 5%. This year's forecast spend has been lower than predicted due to delayed spend with external digitisation suppliers, including delays in contract award, onboarding and exiting the implementation stage. Consequently, there has been an underspend due to the movement in forecast for Transition Payments and New Burdens payments to LAs.","wholeLifeCost":331.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 remained at 331m. This is primarily due to the following factors. Whole life costs for our refined delivery plan remain within the overall cost envelope in the approved Business Case","benefits":9616.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 9616m. The project's departmental-agree monetised benefits at 22/23-Q4 is 9616m.The project's departmental-agree monetised benefits at 22/23-Q4 is 9616m.The project's departmental-agree monetised benefits at 22/23-Q4 is 9616m. Compared to financial year 21/22-Q4, benefits at FY22/23-Q4 remain the same. This is primarily due to the Programme continuing to deliver to schedule although this will be reviewed as the Business Case is refreshed this quarter.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. The programme is doing well with in-house delivered migrations operating to plan and the overall pace of delivery has effectively doubled year on year; however, the length of…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2027-03-31. This is primarily due to the following factors. The refreshed Business Case seeks approval to extend the delivery plan into a fifth year, FY25/26, following delays in the Migration Service Delivery Partners. There is no impact on the overall cost envelop, just movement of spend into FY25/26.","narrativeClaimKind":null},{"id":"BIS_0015_1516-Q1","year":2024,"name":"Local Land Charges (LLC) Programme","department":"HMLR","category":"Government Transformation and Service Delivery","description":"The LLC Programme continues to deliver a digital national Local Land Charges Register, with spatial data at it's core. The service covers all of England and Wales, contributing to improving the home buying and selling process, with almost 100 Local Authorities live. _x000D_ _x000D_ The programme has completed a third of the data digitisation and transformation work and is on track to deliver in line with future expectations, which have been refined based on experiences to date.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The programme has completed a third of the data digitisation and transformation work and is on track to deliver in line with future expectations. _x000D_ _x000D_ External supplier related dependencies - both LA software suppliers and Migration Service Delivery Partners - has meant that migration volumes have been lower than planned up to this point. A refreshed Business Case has been drafted ready for submitting to HMT that takes into account a revised, more realistic delivery plan with regards to key incumbent suppliers' historical performance, the complex LA strategy and assumptions on Migration Service Delivery Partners performance, contract renewal and no offshoring decision._x000D_ _x000D_ Recent conversion of agency staff to fixed term appointments has created stability for staff and delivery, with further recruitment planned to bring the programme up to full headcount by Summer 24._x000D_ _x000D_ The Programme has won three awards, including Civil Service \"Programme of the Year\" award.","startDate":"2014-03-01","endDate":"2027-03-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2027-03-31. This is primarily due to the following factors. The refreshed Business Case seeks to extend the delivery plan into FY 27/28, which takes into account overall programme experience to date. There is a marginal impact on the overall cost envelope in the best case scenario of 14m.","fyBaseline":56.15,"fyForecast":25.94,"fyVariance":-54.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. This year's forecast spend has been lower than predicted due to delayed spend with external digitisation suppliers, due to it taking them longer to get to grips with the work. Consequently, there has been an underspend due to the movement in forecast for Transition Payments and New Burdens payments to LAs.","wholeLifeCost":331.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 remained at 331m. This is primarily due to the following factors. Whole life costs for our refined delivery plan are in line with the refreshed business case.","benefits":9616.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 9616m. Compared to financial year 22/23Q4, benefits at FY23/24-Q4 remain the same. This is primarily due to the Programme continuing to deliver to schedule although this has been reviewed and updated as part of the refreshed Business Case.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Technical & integration"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The programme has completed a third of the data digitisation and transformation work and is on track to deliver in line with future expectations. _x000D_ _x000D_ External…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2027-03-31. This is primarily due to the following factors. The refreshed Business Case seeks to extend the delivery plan into FY 27/28, which takes into account overall programme experience to date. There is a marginal impact on the overall cost envelope in the best case scenario of 14m.","narrativeClaimKind":null},{"id":"BIS_0015_1516-Q1","year":2025,"name":"LOCAL LAND CHARGES (LLC) PROGRAMME","department":"HMLR","category":"Government Transformation and Service Delivery","description":"The Local Land Charges (LLC) Programme is transforming a fragmented, inefficient service currently delivered by local authorities (LAs) to a single national, digital register across England and Wales. LLCs are generally restrictions or prohibitions on the use of land, which binds successive owners and occupiers. A modernised LLC service will contribute to the industrial strategy and improve the end to end house buying and selling process.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Critical external dependencies. Delivery from Migration Service Delivery Partners (MSDPs) needs to ramp up in line with revised Business Case schedule. Internal review scheduled for Q2 to review Landmark (a MSDP) capability.","startDate":"2014-03-01","endDate":"2027-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2027. This is primarily due to the following factors‚ No changes to current project timelines until Spending Review outcomes are finalised (expected Q2 FY25/26)","fyBaseline":57.95,"fyForecast":29.46,"fyVariance":49.16,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ Programme underspend is related to delivery. Current delivery schedules are extended, resulting in increased spend in latter programme years.","wholeLifeCost":331.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 331. This is primarily due to the following factors‚ No changes to departmental agreed costs until Spending Review outcomes are finalised (expected Q2 FY25/26)","benefits":9616.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 9616. This is primarily due to the following factors‚ No changes to departmental agreed benefits baselines until Spending Review outcomes are finalised (expected Q2 FY25/26)","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Critical external dependencies. Delivery from Migration Service Delivery Partners (MSDPs) needs to ramp up in line with revised Business Case schedule. Internal…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2027. This is primarily due to the following factors‚ No changes to current project timelines until Spending Review outcomes are finalised (expected Q2 FY25/26)","narrativeClaimKind":null},{"id":"BIS_0015_1516-Q1","year":2026,"name":"LOCAL LAND CHARGES (LLC) PROGRAMME","department":"HMLR","category":"Government Transformation and Service Delivery","description":"The Local Land Charges (LLC) Programme is transforming a fragmented, inefficient service currently delivered by local authorities (LAs) to a single national, digital register across England and Wales. LLCs are generally restrictions or prohibitions on the use of land, such as planning consents or tree preservation order, which binds successive owners and occupiers. This information is obtained as part of LA searches completed in the property buying process and is integral to the purchasers’ investment decision.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the need for proven end to end delivery at scale by external suppliers, which will be proven in 2026, and external dependencies the programme manage on a case by case basis.","startDate":"2014-03-01","endDate":"2028-12-29","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 increased from 31/03/2027 to 29/12/2028. This is primarily due to a better understanding of delivery length assumptions, and completion of detailed programme delivery planning. This remains in line with the refreshed LLC Full Business Case.","fyBaseline":35.9,"fyForecast":33.6,"fyVariance":6.41,"varianceNarrative":"Programme in year underspend is related to delivery. Current delivery schedules are extended, resulting in increased spend in latter programme years.","wholeLifeCost":346.22,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 remained the same. Following HMT FBC approval, revised baselines will be forecasted.","benefits":8221.01,"benefitsNarrative":"No changes to agreed benefit baselines until programme Monitoring & Evaluation Phase 3 completes in 2027. Current benefit realisation on track.","themes":["Delivery & schedule","Cost & funding","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the need for proven end to end delivery at scale by external suppliers, which will be proven in 2026, and external dependencies the programme manage on a case by case basis. Compared to financial year 24/25-Q4, the…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 increased from 31/03/2027 to 29/12/2028. This is primarily due to a better understanding of delivery length assumptions, and completion of detailed programme delivery planning. This remains in line with the refreshed LLC Full Business Case.","narrativeClaimKind":null}],"previous":{"id":"BIS_0015_1516-Q1","year":2025,"name":"LOCAL LAND CHARGES (LLC) PROGRAMME","department":"HMLR","category":"Government Transformation and Service Delivery","description":"The Local Land Charges (LLC) Programme is transforming a fragmented, inefficient service currently delivered by local authorities (LAs) to a single national, digital register across England and Wales. LLCs are generally restrictions or prohibitions on the use of land, which binds successive owners and occupiers. A modernised LLC service will contribute to the industrial strategy and improve the end to end house buying and selling process.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Critical external dependencies. Delivery from Migration Service Delivery Partners (MSDPs) needs to ramp up in line with revised Business Case schedule. Internal review scheduled for Q2 to review Landmark (a MSDP) capability.","startDate":"2014-03-01","endDate":"2027-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2027. This is primarily due to the following factors‚ No changes to current project timelines until Spending Review outcomes are finalised (expected Q2 FY25/26)","fyBaseline":57.95,"fyForecast":29.46,"fyVariance":49.16,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ Programme underspend is related to delivery. Current delivery schedules are extended, resulting in increased spend in latter programme years.","wholeLifeCost":331.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 331. This is primarily due to the following factors‚ No changes to departmental agreed costs until Spending Review outcomes are finalised (expected Q2 FY25/26)","benefits":9616.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 9616. This is primarily due to the following factors‚ No changes to departmental agreed benefits baselines until Spending Review outcomes are finalised (expected Q2 FY25/26)","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Critical external dependencies. Delivery from Migration Service Delivery Partners (MSDPs) needs to ramp up in line with revised Business Case schedule. Internal…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2027. This is primarily due to the following factors‚ No changes to current project timelines until Spending Review outcomes are finalised (expected Q2 FY25/26)","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":639,"attentionScore":40,"attentionReasons":["Current published delivery confidence is Amber","Published end date moved 639 days later","In-year forecast variance is +6.4%"]},{"id":"DFT_0052_2122-Q1","year":2026,"name":"EAST WEST RAIL CONNECTION STATE 2 AND 3","department":"DFT","category":"Infrastructure and Construction","description":"East West Rail (EWR) is a new railway connecting towns and cities across the Oxford-Cambridge growth corridor. The Government has identified the corridor as a key pillar of its economic growth mission – by delivering new east-west connectivity and removing existing constraints to growth, EWR is projected to support up to 100,000 new homes, tens of thousands of new jobs and it is expected to add £6.7bn to regional Gross Value Added each year by 2050. The EWR programme is structured around the phased introduction of passenger services from the mid 2020s to the mid-late 2030s. The railway will deliver shorter journey times between key economic centres; provide greener public transport and new paths for rail freight; and provide interchanges with major rail lines, supporting onward travel across the country. It will provide a total of 8 new stations and redevelop existing stations unlocking opportunities for growth/regeneration along the corridor. Phases 2 to 5 of the delivery programme (formerly Connection stages 2 and 3) will deliver new stations, the new line between Bedford and Cambridge and upgrade to the Marston Vale Line (Bletchley-Bedford). The future stages include delivering a new station on the East Coast Mainline at Tempsford (with construction starting by 2030); providing four trains per hour between Oxford-Stewartby (early 2030s) and Oxford-Bedford (mid 2030s); delivering a new station at Cambridge East (mid 2030s); and delivery of the new line (between Bedford-Cambridge), unlocking the full Oxford-Cambridge service (mid-late 2030s). This new sequencing was set out in the consultation published in April 2026 and accelerates the delivery of services and benefits along the route.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The assessment remains ‘Amber’. The April 2025 announcement of a Universal Destinations & Experiences (UDX) theme park to open near Bedford in 2031 has necessitated additional design work as set out in the Autumn Announcement in November 2025. Updated scope for the project has been set out in the final route-wide consultation in April 2026 and will subject to approval of the Development Consent Order and Full Business Case.","startDate":"2014-08-01","endDate":"2037-12-31","scheduleNarrative":"Future stages of the railway and delivery of the full Oxford-Cambridge service are subject to an application for a Development Consent Order (DCO) - the application is targeted for submission in 2027. Full completion of the project is planned for the mid-late 2030s. In line with the Government’s ambitions to speed up delivery of major infrastructure projects, certain parts of the project will now be accelerated to be delivered ahead of the mid-2030s, including a new ECML station at Tempsford and EWR services between Oxford and Stewartby serving the new Universal Studios Theme Park in Bedfordshire.","fyBaseline":177.26,"fyForecast":185.92,"fyVariance":4.89,"varianceNarrative":"The budget variance is less than or equal to 5%","wholeLifeCost":null,"costNarrative":"Exempt under Section 35 - Formulation of government policy, Section 43 - Commercial interests","benefits":6326.43,"benefitsNarrative":"Phases 2-5 of the EWR programme are in development, with benefit analysis work being undertaking to support the Outline Business case and Full Business Case being prepared to support investment decision making. Full benefits of the EWR programme will not be realised until the route to Cambridge is operational.","themes":["Approvals & decisions","Delivery & schedule","Scope & requirements","Commercial & supply chain"],"evidenceExcerpt":"The assessment remains ‘Amber’. The April 2025 announcement of a Universal Destinations & Experiences (UDX) theme park to open near Bedford in 2031 has necessitated additional design work as set out in the Autumn Announcement in November 2025. Updated scope for the project has been set out in the final route-wide consultation in April 2026 and will subject…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Future stages of the railway and delivery of the full Oxford-Cambridge service are subject to an application for a Development Consent Order (DCO) - the application is targeted for submission in 2027. Full completion of the project is planned for the mid-late 2030s. In line with the Government’s ambitions to speed up delivery of major infrastructure projects, certain parts of the project will now be accelerated to be delivered ahead of the mid-2030s, including a new ECML station at Tempsford and EWR services between Oxford and Stewartby serving the new Universal Studios Theme Park in Bedfordshire.","narrativeClaimKind":null,"history":[{"id":"DFT_0052_2122-Q1","year":2022,"name":"East West Rail Connection Stage 2 & 3","department":"DFT","category":"Infrastructure and Construction","description":"The East West Rail (EWR) scheme will create a rail link from Oxford to Cambridge. The project is structured around the phased introduction of services (Connection Stages). East West Rail Connection Stage 2 (CS2) predominantly upgrade existing infrastructure (between Bletchley and Bedford) to allow services between Oxford and Bedford. East West Rail CS3 involves building a new line, between Bedford and Cambridge, to extend the railway and facilitate services from Oxford to Cambridge.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 is Red. With the project in the concept and design phase, work continues to refine delivery strategies and the scope and to agree an affordable funding profile with HMT. A non-statutory consultation was completed in June 2021, and funding was gained as part of the 2021 Spending Review for further development work. Currently (Q4 FY 21/22) delivery approaches for this project are being reviewed. This is normal for a large complex project to ensure the business case remains viable. However, this does bring with it a degree of uncertainty over future plans, the scope, and how this project best delivers its intended benefits. The project RAG rating is therefore a natural reflection of this current uncertainty around the project's costs, schedule and scope.","startDate":"2014-08-01","endDate":null,"scheduleNarrative":"This project is still in the concept and design stage. There remains a degree of uncertainty around the overall project schedule, until further work has been completed to refine delivery options and the project's scope and a funding profile agreed with HMT. More detailed information will be provided in subsequent iterations of the IPA's annual report and via project led public engagement in due course.","fyBaseline":88.36,"fyForecast":74.64,"fyVariance":-15.0,"varianceNarrative":"The budget variance exceeds 5%. The variance is largely driven by slight delays to the procurement and onboarding of delivery partners as well as lower capital spend than originally forecast.","wholeLifeCost":null,"costNarrative":"This project is still in the concept and design stage with important scope decisions yet to be made. The cost range is estimated at £4-7bn. More detailed information will be provided in subsequent iterations of the IPA's annual report, and the funding required will be determined via business case processes.","benefits":null,"benefitsNarrative":"","themes":["Scope & requirements","Cost & funding","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 is Red. With the project in the concept and design phase, work continues to refine delivery strategies and the scope and to agree an affordable funding profile with HMT. A non-statutory consultation was completed in June 2021, and funding was gained as part of the 2021…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"This project is still in the concept and design stage. There remains a degree of uncertainty around the overall project schedule, until further work has been completed to refine delivery options and the project's scope and a funding profile agreed with HMT. More detailed information will be provided in subsequent iterations of the IPA's annual report and via project led public engagement in due course.","narrativeClaimKind":null},{"id":"DFT_0052_2122-Q1","year":2023,"name":"East West Rail Connection Stage 2 & 3","department":"DFT","category":"Infrastructure and Construction","description":"The East West Rail (EWR) scheme will create a rail link from Oxford to Cambridge. The project is structured around the phased introduction of services (Connection Stages). East West Rail Connection Stage 2 (CS2) predominantly upgrade existing infrastructure (between Bletchley and Bedford) to allow services between Oxford and Bedford. East West Rail CS3 involves building a new line, between Bedford and Cambridge, to extend the railway and facilitate services from Oxford to Cambridge.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 increased from Red (IPA rating) to Amber (SRO rating). This is primarily due to the following factors. Following a review of the programme, Government recommitted to East West Rail with the March 2023 Budget noting a public announcement on the route would be made in May 2023. Cross-government discussions are taking place how to support local authorities bringing forward plans for strategic economic development around stations on the route (c15m of funding was announced at Budget for this) to ensure benefits will be realised. The delivery programme is now being re-baselined with the aim for a Development Consent Order submission in 2025 with increased confidence in benefits delivery.","startDate":"2014-08-01","endDate":"2030-10-09","scheduleNarrative":"The project's end-date at 22/23-Q4 is 2030-10-09. This is primarily due to the following factors. This project is still in the concept and design stage. There remains a degree of uncertainty around the overall project schedule, until further work has been completed to refine delivery options and the projects scope and a funding profile agreed with HMT. More detailed information will be provided in subsequent iterations of the IPAs annual report and via project led public engagement in due course.","fyBaseline":162.26,"fyForecast":49.72,"fyVariance":-69.0,"varianceNarrative":"The budget variance exceeds 5%. Variance of anticipated spend is primarily due to a review of the schemes priority leading to slower progress than originally anticipated.","wholeLifeCost":3970.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 22/23-Q4 is 3970m. This is primarily due to the following factors. This project is still in the concept and design stage with important scope decisions yet to be made. The cost range is estimated at 4-7bn. More detailed information will be provided in subsequent iterations of the IPAs annual report, and the funding required will be determined via business case processes.","benefits":10961.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 10961m. No annual return benefits narrative provided. EWR can unlock wider benefits (economic growth, jobs, housing). Final benefits realization remains uncertain.","themes":["Cost & funding","Delivery & schedule","Scope & requirements","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 increased from Red (IPA rating) to Amber (SRO rating). This is primarily due to the following factors. Following a review of the programme, Government recommitted to East West Rail with the March 2023 Budget noting a public announcement on the route would be made in…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 22/23-Q4 is 2030-10-09. This is primarily due to the following factors. This project is still in the concept and design stage. There remains a degree of uncertainty around the overall project schedule, until further work has been completed to refine delivery options and the projects scope and a funding profile agreed with HMT. More detailed information will be provided in subsequent iterations of the IPAs annual report and via project led public engagement in due course.","narrativeClaimKind":null},{"id":"DFT_0052_2122-Q1","year":2024,"name":"East West Rail Connection Stage 2 & 3","department":"DFT","category":"Infrastructure and Construction","description":"The East West Rail (EWR) scheme will create a rail link from Oxford to Cambridge. The project is structured around the phased introduction of services (Connection Stages). _x000D_ East West Rail Connection Stage 2 (CS2) predominantly upgrade existing infrastructure (between Bletchley and Bedford) to allow services between Oxford and Bedford. East West Rail CS3 involves building a new line, between Bedford and Cambridge, to extend the railway and facilitate services from Oxford to Cambridge.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The project is currently being re-baselined following the recommitment to the programme and the route update announcement. _x000D_ EWR Co is now planning for two Statutory Consultations for CS2/3 ahead of an OBC and DCO application. _x000D_ Cross-government discussions are being led by HMT through a new EWR economic growth board on how to maximise the opportunities EWR can unlock. The Budget announced up to 15m of funding for local authorities for this and the first stage of work is progressing on developing local visions for growth around stations. _x000D_ As part of the Spring Budget on 6 March 2024, the Chancellor announced delivery of works on the Marston Vale Line of East West Rail will be bought forward, supported by 240m. These works will enable the service between Oxford and Bedford to commence by the end of the decade.","startDate":"2014-08-01","endDate":"2030-10-09","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2030-10-09. This is primarily due to the following factors. This project is still in the concept and design stage. There remains a degree of uncertainty around the overall project schedule, until further work has been completed to refine delivery options and the project's scope and a funding profile agreed with HMT. More detailed information will be provided in subsequent iterations of the IPA's annual report and via project led public engagement in due course.","fyBaseline":175.29,"fyForecast":90.15,"fyVariance":-49.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. Variance of anticipated spend is primarily due to a review of the scheme's priority leading to slower progress than originally anticipated.","wholeLifeCost":3970.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 remained at 3970m. This is primarily due to the following factors. This project is still in the concept and design stage with important scope decisions yet to be made. The cost range is estimated at 4-7bn. More detailed information will be provided in subsequent iterations of the IPA's annual report, and the funding required will be determined via business case processes.","benefits":10961.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 10961m. No annual return benefits provided. EWR can unlock wider benefits (economic growth, jobs, housing). Final benefits realisation remains uncertain.","themes":["Cost & funding","Delivery & schedule","Scope & requirements","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The project is currently being re-baselined following the recommitment to the programme and the route update announcement. _x000D_ EWR Co is now planning for two Statutory…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2030-10-09. This is primarily due to the following factors. This project is still in the concept and design stage. There remains a degree of uncertainty around the overall project schedule, until further work has been completed to refine delivery options and the project's scope and a funding profile agreed with HMT. More detailed information will be provided in subsequent iterations of the IPA's annual report and via project led public engagement in due course.","narrativeClaimKind":null},{"id":"DFT_0052_2122-Q1","year":2025,"name":"EAST WEST RAIL CONNECTION STATE 2 AND 3","department":"DfT","category":"Infrastructure and Construction","description":"The East West Rail (EWR) scheme will create a rail link from Oxford to Cambridge. The project is structured around the phased introduction of services (Connection Stages). East West Rail Connection Stage 2 (CS2) predominantly upgrade existing infrastructure (between Bletchley and Bedford) to allow services between Oxford and Bedford. East West Rail CS3 involves building a new line, between Bedford and Cambridge, to extend the railway and facilitate services from Oxford to Cambridge.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The project is currently being re-baselined following the re-commitment to the programme and the route update announcement. The development of the relationship between Sponsor team and ALB is good, and work on the Key Strategic Assumptions and decisions are being worked through to be defined, agreed and baselined. EWR Co undertook a non-statutory consultation at the end of 2025 and an update report was published in May 2025. Planning is now underway for a Statutory Consultation for CS2/3 ahead of an OBC and DCO application. As part of the Spring Budget in 2025, the Chancellor re-committed to the delivery of works on the Marston Vale Line of East West Rail. These works will enable the service between Oxford and Bedford to commence by the end of the decade.","startDate":"2014-08-01","endDate":"2030-10-09","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 09/10/2030. This is primarily due to the following factors‚ This project is still in the concept and design stage. There remains a degree of uncertainty around the overall project schedule, until further work has been completed to refine delivery options and the project’s scope and a funding profile agreed with HMT. More detailed information will be provided in subsequent iterations of the IPA’s annual report and via project led public engagement in due course.","fyBaseline":175.29,"fyForecast":90.15,"fyVariance":48.57,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ Variance of anticipated spend is primarily due to a review of the scheme’s priority leading to slower progress than originally anticipated.","wholeLifeCost":3970.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 3970. This is primarily due to the following factors‚ This project is still in the concept and design stage with important scope decisions yet to be made. The cost range is estimated at £4-7bn. More detailed information will be provided in subsequent iterations of the IPA’s annual report, and the funding required will be determined via business case processes.","benefits":10961.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 10961. This is primarily due to the following factors‚ Wider benefits (delivery of housing, high value jobs) will fall under the delivery umbrella of the later connection stages. This requires cross-government (MHCLG, and LPV's team in HMT) coordination with sufficient resourcing, support to local places and where appropriate negotiation with the private sector to unlock land value. For the MVL/Bedford specifically, consideration in unlocking any benefits along the MVL to fit with future service provision. Regeneration opportunities at Bedford linked to wider Town Deal aspirations that could impact of the railway scope/station design, where funded by third party.","themes":["Cost & funding","Delivery & schedule","Scope & requirements","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The project is currently being re-baselined following the re-commitment to the programme and the route update announcement. The development of the relationship…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 09/10/2030. This is primarily due to the following factors‚ This project is still in the concept and design stage. There remains a degree of uncertainty around the overall project schedule, until further work has been completed to refine delivery options and the project’s scope and a funding profile agreed with HMT. More detailed information will be provided in subsequent iterations of the IPA’s annual report and via project led public engagement in due course.","narrativeClaimKind":null},{"id":"DFT_0052_2122-Q1","year":2026,"name":"EAST WEST RAIL CONNECTION STATE 2 AND 3","department":"DFT","category":"Infrastructure and Construction","description":"East West Rail (EWR) is a new railway connecting towns and cities across the Oxford-Cambridge growth corridor. The Government has identified the corridor as a key pillar of its economic growth mission – by delivering new east-west connectivity and removing existing constraints to growth, EWR is projected to support up to 100,000 new homes, tens of thousands of new jobs and it is expected to add £6.7bn to regional Gross Value Added each year by 2050. The EWR programme is structured around the phased introduction of passenger services from the mid 2020s to the mid-late 2030s. The railway will deliver shorter journey times between key economic centres; provide greener public transport and new paths for rail freight; and provide interchanges with major rail lines, supporting onward travel across the country. It will provide a total of 8 new stations and redevelop existing stations unlocking opportunities for growth/regeneration along the corridor. Phases 2 to 5 of the delivery programme (formerly Connection stages 2 and 3) will deliver new stations, the new line between Bedford and Cambridge and upgrade to the Marston Vale Line (Bletchley-Bedford). The future stages include delivering a new station on the East Coast Mainline at Tempsford (with construction starting by 2030); providing four trains per hour between Oxford-Stewartby (early 2030s) and Oxford-Bedford (mid 2030s); delivering a new station at Cambridge East (mid 2030s); and delivery of the new line (between Bedford-Cambridge), unlocking the full Oxford-Cambridge service (mid-late 2030s). This new sequencing was set out in the consultation published in April 2026 and accelerates the delivery of services and benefits along the route.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The assessment remains ‘Amber’. The April 2025 announcement of a Universal Destinations & Experiences (UDX) theme park to open near Bedford in 2031 has necessitated additional design work as set out in the Autumn Announcement in November 2025. Updated scope for the project has been set out in the final route-wide consultation in April 2026 and will subject to approval of the Development Consent Order and Full Business Case.","startDate":"2014-08-01","endDate":"2037-12-31","scheduleNarrative":"Future stages of the railway and delivery of the full Oxford-Cambridge service are subject to an application for a Development Consent Order (DCO) - the application is targeted for submission in 2027. Full completion of the project is planned for the mid-late 2030s. In line with the Government’s ambitions to speed up delivery of major infrastructure projects, certain parts of the project will now be accelerated to be delivered ahead of the mid-2030s, including a new ECML station at Tempsford and EWR services between Oxford and Stewartby serving the new Universal Studios Theme Park in Bedfordshire.","fyBaseline":177.26,"fyForecast":185.92,"fyVariance":4.89,"varianceNarrative":"The budget variance is less than or equal to 5%","wholeLifeCost":null,"costNarrative":"Exempt under Section 35 - Formulation of government policy, Section 43 - Commercial interests","benefits":6326.43,"benefitsNarrative":"Phases 2-5 of the EWR programme are in development, with benefit analysis work being undertaking to support the Outline Business case and Full Business Case being prepared to support investment decision making. Full benefits of the EWR programme will not be realised until the route to Cambridge is operational.","themes":["Approvals & decisions","Delivery & schedule","Scope & requirements","Commercial & supply chain"],"evidenceExcerpt":"The assessment remains ‘Amber’. The April 2025 announcement of a Universal Destinations & Experiences (UDX) theme park to open near Bedford in 2031 has necessitated additional design work as set out in the Autumn Announcement in November 2025. Updated scope for the project has been set out in the final route-wide consultation in April 2026 and will subject…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Future stages of the railway and delivery of the full Oxford-Cambridge service are subject to an application for a Development Consent Order (DCO) - the application is targeted for submission in 2027. Full completion of the project is planned for the mid-late 2030s. In line with the Government’s ambitions to speed up delivery of major infrastructure projects, certain parts of the project will now be accelerated to be delivered ahead of the mid-2030s, including a new ECML station at Tempsford and EWR services between Oxford and Stewartby serving the new Universal Studios Theme Park in Bedfordshire.","narrativeClaimKind":null}],"previous":{"id":"DFT_0052_2122-Q1","year":2025,"name":"EAST WEST RAIL CONNECTION STATE 2 AND 3","department":"DfT","category":"Infrastructure and Construction","description":"The East West Rail (EWR) scheme will create a rail link from Oxford to Cambridge. The project is structured around the phased introduction of services (Connection Stages). East West Rail Connection Stage 2 (CS2) predominantly upgrade existing infrastructure (between Bletchley and Bedford) to allow services between Oxford and Bedford. East West Rail CS3 involves building a new line, between Bedford and Cambridge, to extend the railway and facilitate services from Oxford to Cambridge.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The project is currently being re-baselined following the re-commitment to the programme and the route update announcement. The development of the relationship between Sponsor team and ALB is good, and work on the Key Strategic Assumptions and decisions are being worked through to be defined, agreed and baselined. EWR Co undertook a non-statutory consultation at the end of 2025 and an update report was published in May 2025. Planning is now underway for a Statutory Consultation for CS2/3 ahead of an OBC and DCO application. As part of the Spring Budget in 2025, the Chancellor re-committed to the delivery of works on the Marston Vale Line of East West Rail. These works will enable the service between Oxford and Bedford to commence by the end of the decade.","startDate":"2014-08-01","endDate":"2030-10-09","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 09/10/2030. This is primarily due to the following factors‚ This project is still in the concept and design stage. There remains a degree of uncertainty around the overall project schedule, until further work has been completed to refine delivery options and the project’s scope and a funding profile agreed with HMT. More detailed information will be provided in subsequent iterations of the IPA’s annual report and via project led public engagement in due course.","fyBaseline":175.29,"fyForecast":90.15,"fyVariance":48.57,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ Variance of anticipated spend is primarily due to a review of the scheme’s priority leading to slower progress than originally anticipated.","wholeLifeCost":3970.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 3970. This is primarily due to the following factors‚ This project is still in the concept and design stage with important scope decisions yet to be made. The cost range is estimated at £4-7bn. More detailed information will be provided in subsequent iterations of the IPA’s annual report, and the funding required will be determined via business case processes.","benefits":10961.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 10961. This is primarily due to the following factors‚ Wider benefits (delivery of housing, high value jobs) will fall under the delivery umbrella of the later connection stages. This requires cross-government (MHCLG, and LPV's team in HMT) coordination with sufficient resourcing, support to local places and where appropriate negotiation with the private sector to unlock land value. For the MVL/Bedford specifically, consideration in unlocking any benefits along the MVL to fit with future service provision. Regeneration opportunities at Bedford linked to wider Town Deal aspirations that could impact of the railway scope/station design, where funded by third party.","themes":["Cost & funding","Delivery & schedule","Scope & requirements","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The project is currently being re-baselined following the re-commitment to the programme and the route update announcement. The development of the relationship…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 09/10/2030. This is primarily due to the following factors‚ This project is still in the concept and design stage. There remains a degree of uncertainty around the overall project schedule, until further work has been completed to refine delivery options and the project’s scope and a funding profile agreed with HMT. More detailed information will be provided in subsequent iterations of the IPA’s annual report and via project led public engagement in due course.","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":2640,"attentionScore":38,"attentionReasons":["Current published delivery confidence is Amber","Published end date moved 2,640 days later"]},{"id":"DEFRA_0008_2021-Q1","year":2026,"name":"FARMING AND COUNTRYSIDE PROGRAMME","department":"DEFRA","category":"Government Transformation and Service Delivery","description":"By 2028, the Farming and Countryside Programme aims to deliver: 1) A renewed agricultural sector, producing healthy food for consumption at home and abroad, where farms can be profitable and economically sustainable without subsidy 2) Farming and the countryside contributing significantly to environmental goals including addressing climate change","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Red. The issues that drove the original Red rating have largely been resolved. Policy is now stable, a credible delivery pathway is in place, and delivery confidence has been strengthened through the successful launch of Capital Grants, completion of applications for customers affected by the closure of SFI24, progress on the Countryside Stewardship offer and a Spending Review settlement that supports risk management and stakeholder engagement. FCP remains at Red due to a new set of issues identified through a NISTA-style review in Q1 and Q2 of 25/26. This found scope had expanded beyond the original programme remit, with blurred boundaries between transformation and business-as-usual leading to spend on activities outside the programme. These issues have also now been substantially addressed. Scope has been reset to focus on delivery of ELM schemes in 2026 and the design and establishment of the underpinning digital service. Accountability has been clarified including through the creation of the Farming Directorate (FD) which is now responsible for the farming budget and ongoing scheme management post programme closure. Digitally-enabled transformation of farming grant and scheme services will be delivered through a separate programme. This will ensure it is equipped with the tailored tools, approaches and accountabilities it needs to succeed. Consequent to progress made, an independent NISTA-style review scheduled for April 2026 is expected to support a change to our DCA category.","startDate":"2017-05-01","endDate":"2028-12-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same at 31/12/2028. While the programme remains at RED, this has not impacted the programmes end date. Following the revised scope for the remainder of the GMPP scope delivery, we now have a more defined path to AMBER which will ensure the programme delivery remains on track to deliver to schedule.","fyBaseline":2843.27,"fyForecast":2576.43,"fyVariance":9.38,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":25494.95,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) remained at 24,875. The costs are split into two main sections, payments to beneficiaries (scheme costs) and the costs of delivering those schemes together with policy and programme support (administrative costs). Both are linked to SR25 settlements.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 are no longer being calculated. This is primarily due to the following factors. Previously reported benefits were drawn from phase 2 Programme Business Case analysis (produced in 2021) and are not reflective of the many changes to the programme's plans and actual delivery since they were produced. So, we now report that the monetised benefits of the current programme and its expected future rollout are not calculated. Updated programme level lifetime analysis will be provided when this is produced and approved at a working level, department level, and HMT level accordingly.","themes":["Delivery & schedule","Cost & funding","Scope & requirements","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Red. The issues that drove the original Red rating have largely been resolved. Policy is now stable, a credible delivery pathway is in place, and delivery confidence has been strengthened through the successful launch of Capital Grants,…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same at 31/12/2028. While the programme remains at RED, this has not impacted the programmes end date. Following the revised scope for the remainder of the GMPP scope delivery, we now have a more defined path to AMBER which will ensure the programme delivery remains on track to deliver to schedule.","narrativeClaimKind":null,"history":[{"id":"DEFRA_0008_2021-Q1","year":2021,"name":"Future Farming and Countryside Programme","department":"DEFRA","category":"Government Transformation and Service Delivery","description":"By 2028, the Future Farming and Countryside Programme aims to deliver: 1) A renewed agricultural sector, producing healthy food for consumption at home and abroad, where farms can be profitable and economically sustainable without subsidy 2) Farming and the countryside contributing significantly to environmental goals including addressing climate change","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber.This is primarily due to the following factors: The Future Farming and Countryside Programme's Delivery Confidence Assessment remains Amber in line with the IPA Programme Assessment Review in August 2020. The Programme has effectively responded to the recommendations from this Review and the Major Projects Review Group conditions, as set out in August/September 2020 respectively, and continues to increase delivery confidence. With active reprioritisation to mitigate the effects of ongoing Covid19 lockdown impacts the Programme has successfully maintained progress against critical path delivery. In November 2020, 'The Path to Sustainable Farming: An Agricultural Transition Plan', was published, setting out the vision for the future. Since then, the Programme has launched a pilot of the first of three environmental land management schemes, the Sustainable Farming Incentive, which is the first step on the road to truly sustainable farming.","startDate":"2017-05-01","endDate":"2028-12-31","scheduleNarrative":"The project end-date is 31 December 2028. This is primarily due to the following factors: We are embarking on these ambitious and much needed reforms amid an uncertain wider economic and policy context for the agricultural sector, as we discuss new trade deals and develop policy around net zero. This presents challenges we will have to navigate carefully. We are taking a co-design, test and learn approach which means we will monitor how the programme is landing and adjust course as needed.","fyBaseline":2701.09,"fyForecast":2731.22,"fyVariance":1.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":24629.59,"costNarrative":"The projects Baseline Whole Life Cost is �24629.59m. This is primarily due to the following factors: Costs are split into two main sections, the projected payment streams to beneficiaries (scheme costs), as well as estimating the associated future delivery, programme support and one-off implementation costs to deliver the Future Farming & Countryside programme (administrative costs). Scheme costs are linked to the quantification of the manifesto commitment to guarantee the current annual budget to farmers in every year of this Parliament. This includes Non-Gov costs in relation to EU funding that will still be accessible under the terms of the Withdrawal Agreement, which will be available during 20/21, 21/22 and 22/23. Administrative costs are made up of scheme running costs, corporate service charges, depreciation charges, programme support costs and implementation costs.","benefits":null,"benefitsNarrative":"","themes":["Delivery & schedule","Cost & funding","Governance & assurance","Scope & requirements"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber.This is primarily due to the following factors: The Future Farming and Countryside Programme's Delivery Confidence Assessment remains Amber in line with the IPA Programme Assessment Review in August 2020. The Programme has effectively responded to the recommendations from…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project end-date is 31 December 2028. This is primarily due to the following factors: We are embarking on these ambitious and much needed reforms amid an uncertain wider economic and policy context for the agricultural sector, as we discuss new trade deals and develop policy around net zero. This presents challenges we will have to navigate carefully. We are taking a co-design, test and learn approach which means we will monitor how the programme is landing and adjust course as needed.","narrativeClaimKind":null},{"id":"DEFRA_0008_2021-Q1","year":2022,"name":"Future Farming and Countryside Programme","department":"DEFRA","category":"Government Transformation and Service Delivery","description":"By 2028, the Future Farming and Countryside Programme aims to deliver: 1) A renewed agricultural sector, producing healthy food for consumption at home and abroad, where farms can be profitable and economically sustainable without subsidy 2) Farming and the countryside contributing significantly to environmental goals including addressing climate change","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 remained at Amber Planning for derailment: Contingency Scenario Planning Framework developed for rollout. Currently testing with options to respond to Ukraine Crisis impact on farming Scope Management: Change Control process embedded. Now developing a decision-making framework to build into Lifecycle and Policy pipeline assessments Agile transition: Agile coaching / training across programme. Process and decision-taking revised to reflect new approach. Learning embedded into Programme restructure around Single Service; regular communications events and SharePoint information sharing alongside, with focus on impacts on individuals and teams to bring internal users along the journey. Operational delivery: Work continues with planning deep dives to assess delivery confidence and alignment to Critical Timeline. Planning templates were updated with Transition to Operations, Closure, Handover, and planning for Benefits. Milestones and RAIDD are extracted from plans to assess deliverability, consistency and inform Critical Timeline. Delivery Partners embedded in project teams and planning requirements.","startDate":"2017-05-01","endDate":"2028-12-31","scheduleNarrative":"Compared to 2021-Q4, your project end-date remained scheduled to finish on 31 DEC 2028 . This is primarily due to the following factors: The department continues to deliver the planned reforms and although some changes to plans have been made as part of our test and learn approach, delivery is on track for the critical path milestones, costs and benefits.","fyBaseline":2299.31,"fyForecast":2247.41,"fyVariance":-2.0,"varianceNarrative":"The budget variance is inferior or equal to 5%.","wholeLifeCost":24864.0,"costNarrative":"Compared to2021-Q4, the projects Baseline Whole Life Cost increased from 24629.59 (£m) to 24864.26 (£m). This is primarily due to the following factors: The costs are split into two main sections, payments to beneficiaries (scheme costs) and the costs of delivering those schemes together with policy and programme support (administrative costs).The value of the scheme costs will be linked to the definition of the manifesto commitment to guarantee the current annual budget to farmers in every year of this Parliament.","benefits":null,"benefitsNarrative":"","themes":["Delivery & schedule","Cost & funding","Approvals & decisions","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 remained at Amber Planning for derailment: Contingency Scenario Planning Framework developed for rollout. Currently testing with options to respond to Ukraine Crisis impact on farming Scope Management: Change Control process…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to 2021-Q4, your project end-date remained scheduled to finish on 31 DEC 2028 . This is primarily due to the following factors: The department continues to deliver the planned reforms and although some changes to plans have been made as part of our test and learn approach, delivery is on track for the critical path milestones, costs and benefits.","narrativeClaimKind":null},{"id":"DEFRA_0008_2021-Q1","year":2023,"name":"Farming and Countryside Programme","department":"DEFRA","category":"Government Transformation and Service Delivery","description":"By 2028, the Farming and Countryside Programme aims to deliver: 1) A renewed agricultural sector, producing healthy food for consumption at home and abroad, where farms can be profitable and economically sustainable without subsidy 2) Farming and the countryside contributing significantly to environmental goals including addressing climate change","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. Programme remains deliverable with majority of critical outcomes on track and expected challenges being managed.Weve: * Launched the Lump Sum Exit Scheme * Tree Health Pilot went live * Successful launch of Sustainable Farming Incentive early rollout phase 1 followed by opening for applications and then allowing those in existing stewardship agreements to apply directly online* Soft launch of Farming Investment Fund Adding Value, online eligibility checker and applications.* Countryside Stewardship 2024 policy proposal and Countryside Stewardship 2022 facilitation fund approved by Minister and payments rates for Countryside Stewardship 2024 agreed in principle* First Vet Visit took place in September, private beta launched in OctoberIPA Review resulted in a very positive report (Amber rating), noting good progress in the last year and supporting the direction of travel towards embedding the one-team way of working in the Sustainable Farming Incentive delivery space to enable efficiency in decision-making and join-up with delivery partners","startDate":"2017-05-01","endDate":"2028-12-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2028-12-31. This is primarily due to the following factors. The department continues to deliver the planned reforms and although some changes to plans have been made as part of our test and learn approach, delivery is on track for the critical path milestones, costs and benefits.","fyBaseline":2638.03,"fyForecast":2535.45,"fyVariance":-4.0,"varianceNarrative":"The budget variance is inferior or equal to 5%.","wholeLifeCost":24875.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 increased from 24864m. to 24875m. This is primarily due to the following factors. The costs are split into two main sections, payments to beneficiaries (scheme costs) and the costs of delivering those schemes together with policy and programme support (administrative costs).The value of the scheme costs will be linked to the definition of the manifesto commitment to guarantee the current annual budget to farmers in every year of this Parliament.","benefits":58865.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 58865m. The project's departmental-agree monetised benefits at 22/23-Q4 is 58865m.The project's departmental-agree monetised benefits at 22/23-Q4 is 58865m.The project's departmental-agree monetised benefits at 22/23-Q4 is 58865m. The total project Baseline Monetised Benefits are 58.86bn. These benefits are from the approved Phase 2 Business Case from September 2021 these figures do not reflect changes in the programme since then, however, updated figures will be provided going forwards. The benefits presented here have been calculated bottom-up by scheme and totalled across the programme. This is a cautious estimate as not all schemes have monetised benefits and, for some schemes, benefits have been calculated from the year of spend but do not necessarily materialise in that year of spend.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. Programme remains deliverable with majority of critical outcomes on track and expected challenges being managed.Weve: * Launched the Lump Sum Exit Scheme * Tree…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2028-12-31. This is primarily due to the following factors. The department continues to deliver the planned reforms and although some changes to plans have been made as part of our test and learn approach, delivery is on track for the critical path milestones, costs and benefits.","narrativeClaimKind":null},{"id":"DEFRA_0008_2021-Q1","year":2024,"name":"Farming and Countryside Programme","department":"DEFRA","category":"Government Transformation and Service Delivery","description":"By 2028, the Farming and Countryside Programme aims to deliver: 1) A renewed agricultural sector, producing healthy food for consumption at home and abroad, where farms can be profitable and economically sustainable without subsidy 2) Farming and the countryside contributing significantly to environmental goals including addressing climate change","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. Programme remains deliverable with majority of critical outcomes on track and expected challenges being managed._x000D_ We've:_x000D_ _x000D_ . Opened Countryside Stewardship 2024 Mid-tier scheme for agreements starting in January 2024 and the CS Facilitation Fund opened in October._x000D_ . Invited 374 projects to submit Slurry Infrastructure Grant full applications and funding approved for Phase II of the Slurry Investment fund._x000D_ . Launched Water Management grants round 2 scheme._x000D_ . 22 projects in Landscape Recovery Round 1 had grant agreements and moved into the 2-year Project Development phase. Round 2 was launched with 34 successful applications._x000D_ . Since opening for applications, the Sustainable Farming Incentive (SFI) has received 17,466 applications and issued 16,160 agreement offers. We have exceeded our central scenario for the number and value of applications during the financial year.","startDate":"2017-05-01","endDate":"2028-12-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2028-12-31. This is primarily due to the following factors. The department continues to deliver the planned reforms and although some changes to plans have been made as part of our test and learn approach, delivery is on track for the critical path milestones, costs and benefits.","fyBaseline":2788.03,"fyForecast":2529.67,"fyVariance":-9.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The costs of the Farming and Countryside Programme include amounts that are paid to beneficiaries and the associated delivery of the programme. The original baseline for 23/24 of 2,788m is comprised of 2,116m RDEL and 672m CDEL. The forecast of 2,529m is comprised of 2,152m RDEL and 377m CDEL. This represents an overall variance of 259m._x000D_ _x000D_ The programme has an aspiration to deliver on the manifesto commitment to spend on average 2.4bn a year across this Parliament on payments to beneficiaries and agreed flexibility between years to do this. 248m of payments to beneficiaries has been re-profiled from 23/24 to 24/25 to ensure that the programme continues to deliver its intended outcomes._x000D_ _x000D_ This has seen the forecast for 24/25 being 3,060m, comprised of 2,279m RDEL and 781m CDEL, compared to the original baseline of 2,824m, comprised of 2,085m RDEL and 739m CDEL. This represents an overall variance of 236m.","wholeLifeCost":24875.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 remained at 24875m. This is primarily due to the following factors. The costs are split into two main sections, payments to beneficiaries (scheme costs) and the costs of delivering those schemes together with policy and programme support (administrative costs).The value of the scheme costs will be linked to the definition of the manifesto commitment to guarantee the current annual budget to farmers in every year of this Parliament.","benefits":58865.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 58865m. The total project Baseline Monetised Benefits are 58.86bn. These benefits are from the approved Phase 2 Business Case from September 2021 - these figures do not reflect changes in the programme since then, however, updated figures will be provided going forwards. The benefits presented here have been calculated bottom-up by scheme and totalled across the programme. This is a cautious estimate as not all schemes have monetised benefits and, for some schemes, benefits have been calculated from the year of spend but do not necessarily materialise in that year of spend.","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. Programme remains deliverable with majority of critical outcomes on track and expected challenges being managed._x000D_ We've:_x000D_ _x000D_ . Opened Countryside…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2028-12-31. This is primarily due to the following factors. The department continues to deliver the planned reforms and although some changes to plans have been made as part of our test and learn approach, delivery is on track for the critical path milestones, costs and benefits.","narrativeClaimKind":null},{"id":"DEFRA_0008_2021-Q1","year":2025,"name":"FARMING AND COUNTRYSIDE PROGRAMME","department":"DEFRA","category":"Government Transformation and Service Delivery","description":"By 2028, the Farming and Countryside Programme aims to deliver: 1) A renewed agricultural sector, producing healthy food for consumption at home and abroad, where farms can be profitable and economically sustainable without subsidy 2) Farming and the countryside contributing significantly to environmental goals including addressing climate change.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 decreased from AMBER to RED. Delivery risk continued to rise. The closure of the Sustainable Farming Initiative (SFI) to new applicants disrupted delivery timelines. Defra were unable to re-plan with confidence until the funding position was clarified through Spending Review Phase 2 (SR2). There was no longer a plausible pathway to the scheme uptake and outcomes set out in our Programme Business Case (PBC). The PBC assumed a higher level of funding and uptake than was expected in April 2025, particularly for SFI. Farmers’ willingness to participate in schemes was harder to predict at that point because of recent external factors such as the impact of inheritance tax changes and the closure of the 2024 SFI scheme to new applicants in March 2025; and there was uncertainty over when Countryside Stewardship Higher Tier (CSHT) would be delivered. More broadly, the wider strategic context within which the Programme is operating has also shifted significantly and isn’t expected to settle until later in the year pending publication of the Food Strategy, the revised Environmental Improvement Plan, the Land Use Framework and the Farming Roadmap. Defra is working closely with NISTA to shape our next steps, including the development of a targeted remediation plan in order to address residual concerns underpinning this assessment and cement a pathway back to AMBER. Some key upcoming developments in the coming months which would help address some of the issues regarding delivery confidence, stakeholder concerns and the willingness of farmers to participate in schemes would include: • a positive SR2 settlement for the Programme that clarifies the funding position and provides a basis for improved management of the funding risk and related stakeholder concerns • successful reopening of the Capital Grants offer, evidenced by the demand levels for that scheme • successful delivery of SFI 2024 and management of the cohort who were unable to complete an application prior to the scheme closing • clearer communications about when the Countryside Stewardship Higher Tier scheme would open.","startDate":"2017-05-01","endDate":"2028-12-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/12/2028. The change of Programme status from Amber to Red has not impacted the projects end date. A remediation plan is being put in place to ensure that the programme remains on track to deliver to schedule.","fyBaseline":2824.17,"fyForecast":3005.67,"fyVariance":6.43,"varianceNarrative":"The budget variance exceeds 5%. £248m from the 23/24 budget was moved into 24/25 to maintain the commitment to spend on average c. £2.4bn a year on the farming budget across the previous Parliament (20/21 to 24/25).","wholeLifeCost":24875.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 24875. The costs are split into two main sections, payments to beneficiaries (scheme costs) and the costs of delivering those schemes together with policy and programme support (administrative costs). The value of the scheme costs will be linked to the definition of the manifesto commitment to guarantee the current annual budget to farmers in every year of this Parliament.","benefits":58864.9,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 58865. The benefits estimate is based on economic appraisal of likely benefits of the Programme, as set out in the FCP Phase 2 Programme Business Case, agreed September 2021. These figures have not been updated to reflect changes in the Programme since then, due to ongoing uncertainty. The benefits presented here have been calculated bottom-up by scheme and totalled across the programme.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 decreased from AMBER to RED. Delivery risk continued to rise. The closure of the Sustainable Farming Initiative (SFI) to new applicants disrupted delivery timelines. Defra were unable to re-plan with confidence until the funding…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/12/2028. The change of Programme status from Amber to Red has not impacted the projects end date. A remediation plan is being put in place to ensure that the programme remains on track to deliver to schedule.","narrativeClaimKind":null},{"id":"DEFRA_0008_2021-Q1","year":2026,"name":"FARMING AND COUNTRYSIDE PROGRAMME","department":"DEFRA","category":"Government Transformation and Service Delivery","description":"By 2028, the Farming and Countryside Programme aims to deliver: 1) A renewed agricultural sector, producing healthy food for consumption at home and abroad, where farms can be profitable and economically sustainable without subsidy 2) Farming and the countryside contributing significantly to environmental goals including addressing climate change","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Red. The issues that drove the original Red rating have largely been resolved. Policy is now stable, a credible delivery pathway is in place, and delivery confidence has been strengthened through the successful launch of Capital Grants, completion of applications for customers affected by the closure of SFI24, progress on the Countryside Stewardship offer and a Spending Review settlement that supports risk management and stakeholder engagement. FCP remains at Red due to a new set of issues identified through a NISTA-style review in Q1 and Q2 of 25/26. This found scope had expanded beyond the original programme remit, with blurred boundaries between transformation and business-as-usual leading to spend on activities outside the programme. These issues have also now been substantially addressed. Scope has been reset to focus on delivery of ELM schemes in 2026 and the design and establishment of the underpinning digital service. Accountability has been clarified including through the creation of the Farming Directorate (FD) which is now responsible for the farming budget and ongoing scheme management post programme closure. Digitally-enabled transformation of farming grant and scheme services will be delivered through a separate programme. This will ensure it is equipped with the tailored tools, approaches and accountabilities it needs to succeed. Consequent to progress made, an independent NISTA-style review scheduled for April 2026 is expected to support a change to our DCA category.","startDate":"2017-05-01","endDate":"2028-12-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same at 31/12/2028. While the programme remains at RED, this has not impacted the programmes end date. Following the revised scope for the remainder of the GMPP scope delivery, we now have a more defined path to AMBER which will ensure the programme delivery remains on track to deliver to schedule.","fyBaseline":2843.27,"fyForecast":2576.43,"fyVariance":9.38,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":25494.95,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) remained at 24,875. The costs are split into two main sections, payments to beneficiaries (scheme costs) and the costs of delivering those schemes together with policy and programme support (administrative costs). Both are linked to SR25 settlements.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 are no longer being calculated. This is primarily due to the following factors. Previously reported benefits were drawn from phase 2 Programme Business Case analysis (produced in 2021) and are not reflective of the many changes to the programme's plans and actual delivery since they were produced. So, we now report that the monetised benefits of the current programme and its expected future rollout are not calculated. Updated programme level lifetime analysis will be provided when this is produced and approved at a working level, department level, and HMT level accordingly.","themes":["Delivery & schedule","Cost & funding","Scope & requirements","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Red. The issues that drove the original Red rating have largely been resolved. Policy is now stable, a credible delivery pathway is in place, and delivery confidence has been strengthened through the successful launch of Capital Grants,…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same at 31/12/2028. While the programme remains at RED, this has not impacted the programmes end date. Following the revised scope for the remainder of the GMPP scope delivery, we now have a more defined path to AMBER which will ensure the programme delivery remains on track to deliver to schedule.","narrativeClaimKind":null}],"previous":{"id":"DEFRA_0008_2021-Q1","year":2025,"name":"FARMING AND COUNTRYSIDE PROGRAMME","department":"DEFRA","category":"Government Transformation and Service Delivery","description":"By 2028, the Farming and Countryside Programme aims to deliver: 1) A renewed agricultural sector, producing healthy food for consumption at home and abroad, where farms can be profitable and economically sustainable without subsidy 2) Farming and the countryside contributing significantly to environmental goals including addressing climate change.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 decreased from AMBER to RED. Delivery risk continued to rise. The closure of the Sustainable Farming Initiative (SFI) to new applicants disrupted delivery timelines. Defra were unable to re-plan with confidence until the funding position was clarified through Spending Review Phase 2 (SR2). There was no longer a plausible pathway to the scheme uptake and outcomes set out in our Programme Business Case (PBC). The PBC assumed a higher level of funding and uptake than was expected in April 2025, particularly for SFI. Farmers’ willingness to participate in schemes was harder to predict at that point because of recent external factors such as the impact of inheritance tax changes and the closure of the 2024 SFI scheme to new applicants in March 2025; and there was uncertainty over when Countryside Stewardship Higher Tier (CSHT) would be delivered. More broadly, the wider strategic context within which the Programme is operating has also shifted significantly and isn’t expected to settle until later in the year pending publication of the Food Strategy, the revised Environmental Improvement Plan, the Land Use Framework and the Farming Roadmap. Defra is working closely with NISTA to shape our next steps, including the development of a targeted remediation plan in order to address residual concerns underpinning this assessment and cement a pathway back to AMBER. Some key upcoming developments in the coming months which would help address some of the issues regarding delivery confidence, stakeholder concerns and the willingness of farmers to participate in schemes would include: • a positive SR2 settlement for the Programme that clarifies the funding position and provides a basis for improved management of the funding risk and related stakeholder concerns • successful reopening of the Capital Grants offer, evidenced by the demand levels for that scheme • successful delivery of SFI 2024 and management of the cohort who were unable to complete an application prior to the scheme closing • clearer communications about when the Countryside Stewardship Higher Tier scheme would open.","startDate":"2017-05-01","endDate":"2028-12-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/12/2028. The change of Programme status from Amber to Red has not impacted the projects end date. A remediation plan is being put in place to ensure that the programme remains on track to deliver to schedule.","fyBaseline":2824.17,"fyForecast":3005.67,"fyVariance":6.43,"varianceNarrative":"The budget variance exceeds 5%. £248m from the 23/24 budget was moved into 24/25 to maintain the commitment to spend on average c. £2.4bn a year on the farming budget across the previous Parliament (20/21 to 24/25).","wholeLifeCost":24875.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 24875. The costs are split into two main sections, payments to beneficiaries (scheme costs) and the costs of delivering those schemes together with policy and programme support (administrative costs). The value of the scheme costs will be linked to the definition of the manifesto commitment to guarantee the current annual budget to farmers in every year of this Parliament.","benefits":58864.9,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 58865. The benefits estimate is based on economic appraisal of likely benefits of the Programme, as set out in the FCP Phase 2 Programme Business Case, agreed September 2021. These figures have not been updated to reflect changes in the Programme since then, due to ongoing uncertainty. The benefits presented here have been calculated bottom-up by scheme and totalled across the programme.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 decreased from AMBER to RED. Delivery risk continued to rise. The closure of the Sustainable Farming Initiative (SFI) to new applicants disrupted delivery timelines. Defra were unable to re-plan with confidence until the funding…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/12/2028. The change of Programme status from Amber to Red has not impacted the projects end date. A remediation plan is being put in place to ensure that the programme remains on track to deliver to schedule.","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":0,"attentionScore":38,"attentionReasons":["Current published delivery confidence is Red","In-year forecast variance is +9.4%"]},{"id":"DFE_0015_2021-Q3","year":2026,"name":"FE Capital Transformation","department":"DFE","category":"Infrastructure and Construction","description":"The FE Capital Transformation programme, first launched in 2020, was intended to upgrade and transform the further education college estate.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The delivery confidence is Amber and is moving towards Green. With the majority of projects completed or in contract, the risk of procurement pressures across the programme due to inflationary and market pressures has been reduced. This change in delivery confidence is driven by sustained progress in progressing projects into contract and to completion. Active engagement with FE colleges and key stakeholders remains critical to managing any affordability challenges in the projects that are not yet in contract. Looking ahead, progressing the small number of remaining projects into contract is the key priority. These tend to be the most multifaceted projects. Delivery confidence will become green when these schemes proceed into contract mitigating the risk of cost escalation.","startDate":"2020-04-01","endDate":"2029-09-30","scheduleNarrative":"The project's end-date at 25/26-Q4 has changed to 30/09/2029 reflecting the timelines of the small number of remaining multifaceted projects.","fyBaseline":483.95,"fyForecast":487.16,"fyVariance":0.66,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":2057.2,"costNarrative":"Whole Life Costs are based on the latest spending review which was agreed Spring 2025.","benefits":11323.84,"benefitsNarrative":"The key factors in monetising the benefits of the FE Capital Transformation Programme are the number of additional learners due to addressing poor condition estate, and the net present value of an FE aim started by the additional learners.","themes":["Commercial & supply chain","Delivery & schedule","Cost & funding","Approvals & decisions"],"evidenceExcerpt":"The delivery confidence is Amber and is moving towards Green. With the majority of projects completed or in contract, the risk of procurement pressures across the programme due to inflationary and market pressures has been reduced. This change in delivery confidence is driven by sustained progress in progressing projects into contract and to completion.…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 25/26-Q4 has changed to 30/09/2029 reflecting the timelines of the small number of remaining multifaceted projects.","narrativeClaimKind":null,"history":[{"id":"DFE_0015_2021-Q3","year":2021,"name":"FE Capital Transformation","department":"DFE","category":"Infrastructure and Construction","description":"The FE Capital Transformation programme will deliver the government's manifesto commitment to upgrade and transform the further education college estate. This will support the FE sector to deliver on its reform agenda and to support the levelling up of learner and labour market needs across the country with greater emphasis on technical education and vocational training.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber.This is primarily due to the following factors: The Delivery Confidence Assessment is rated Amber following an external assurance review by the IPA held in March 2021. The review confirmed that there has been considerable progress made to initiate the programme. All three phases of the programme delivery have launched to schedule. This capital programme delivery approach is new for the further education sector but builds upon the experience, knowledge and capability already established for the department's school rebuilding programme.","startDate":"2020-04-01","endDate":"2025-06-30","scheduleNarrative":"The project end-date is 30 June 2025. This is primarily due to the following factors: All three phases of the programme delivery have launched and are progressing to schedule. �200 million of grant allocations were issued to further education colleges in September 2020 to enable them to undertake immediate remedial work to refurbish their buildings. In January 2021, all further education colleges were invited to bid for additional funding to help upgrade their campuses and address condition need in their existing buildings. Bids are now being considered by the department with grant funding expected to be awarded in autumn 2021. In April 2021, the department announced it is working in partnership with the 16 further education colleges to deliver projects that will address some of the worst condition campuses across England.","fyBaseline":null,"fyForecast":null,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%. There is no budget variance to report in the early months of the 5-year programme","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"","themes":["Delivery & schedule","Cost & funding","Governance & assurance","Commercial & supply chain"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber.This is primarily due to the following factors: The Delivery Confidence Assessment is rated Amber following an external assurance review by the IPA held in March 2021. The review confirmed that there has been considerable progress made to initiate the programme. All three…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project end-date is 30 June 2025. This is primarily due to the following factors: All three phases of the programme delivery have launched and are progressing to schedule. �200 million of grant allocations were issued to further education colleges in September 2020 to enable them to undertake immediate remedial work to refurbish their buildings. In January 2021, all further education colleges were invited to bid for additional funding to help upgrade their campuses and address condition need in their existing buildings. Bids are now being considered by the department with grant funding expected to be awarded in autumn 2021. In April 2021, the department announced it is working in partnership with the 16 further education colleges to deliver projects that will address some of the worst condition campuses across England.","narrativeClaimKind":null},{"id":"DFE_0015_2021-Q3","year":2022,"name":"FE Capital Transformation","department":"DFE","category":"Infrastructure and Construction","description":"The FE capital transformation will fund investment in FE colleges through: grants, 16 centrally delivered projects, and bidding rounds over five years. The programme will deliver on the government's manifesto commitment to upgrade and transform the FE college estate. This will support the FE sector to deliver on its reform agenda and to support the levelling up of learner and labour market needs across the country, with greater emphasis on technical education and vocational training.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 remained at Amber The Delivery Confidence Assessment is Amber as rated by the external assurance review in March 2021. All three phases of the programme delivery are launched and are being progressed in tandem. Phase 1 is complete. Phase 2 and Phase 3 are slightly delayed but are now progressing well. Announcements for Phase 3 are due early April. Delays will affect the profile of outturn spend; HMT has approved a revised annual spend profile through SR21. Work is well underway to develop the policy underpinning the next round of funding.?","startDate":"2020-04-01","endDate":"2025-06-30","scheduleNarrative":"Compared to 2021-Q4, your project end-date remained scheduled to finish on 30 JUN 2025 . This is primarily due to the following factors: All three phases of the programme delivery are launched and are being progressed in tandem. The first phase of the fund saw an initial £200 million allocated to all colleges so they could carry out urgent remedial work to refurbish their buildings. Following this, in April 2021 an announcement was made to work in partnership with sixteen colleges with some of the poorest condition sites in the country to upgrade their sites and ensure they are excellent places to learn. Construction is under way at one of these projects - Stafford College - and others will soon be ready to begin works. Through the 3rd Phase of the programme 62 FE colleges across the country are to benefit from building and campus upgrades and transformation, helping to level up opportunities for more people. 78 projects will be supported in total to allow colleges to create great buildings and facilities for high-quality training so more people progress into rewarding jobs, and plugging plug skills gaps in local economies.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"","themes":["Delivery & schedule","Commercial & supply chain","Cost & funding","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 remained at Amber The Delivery Confidence Assessment is Amber as rated by the external assurance review in March 2021. All three phases of the programme delivery are launched and are being progressed in tandem. Phase 1 is complete.…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to 2021-Q4, your project end-date remained scheduled to finish on 30 JUN 2025 . This is primarily due to the following factors: All three phases of the programme delivery are launched and are being progressed in tandem. The first phase of the fund saw an initial £200 million allocated to all colleges so they could carry out urgent remedial work to refurbish their buildings. Following this, in April 2021 an announcement was made to work in partnership with sixteen colleges with some of the poorest condition sites in the country to upgrade their sites and ensure they are excellent places to learn. Construction is under way at one of these projects - Stafford College - and others will soon be ready to begin works. Through the 3rd Phase of the programme 62 FE colleges across the country are to benefit from building and campus upgrades and transformation, helping to level up opportunities for more people. 78 projects will be supported in total to allow colleges to create great buildings and facilities for high-quality training so more people progress into rewarding jobs, and plugging plug skills gaps in local economies.","narrativeClaimKind":null},{"id":"DFE_0015_2021-Q3","year":2023,"name":"FE Capital Transformation","department":"DFE","category":"Infrastructure and Construction","description":"The FE capital transformation will fund investment in FE colleges through: grants, 16 centrally delivered projects, and bidding rounds over five years. The programme will deliver on the government's manifesto commitment to upgrade and transform the FE college estate. This will support the FE sector to deliver on its reform agenda and to support the levelling up of learner and labour market needs across the country, with greater emphasis on technical education and vocational training.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. The Delivery Confidence Assessment is Amber as rated by the external assurance review in January 2023. All three phases of the programme delivery are launched and are being progressed in tandem. Phase 1 is complete. Phase 2 and Phase 3 round 1 are slightly delayed but are now progressing well. Phase 3 round 2 allocations were announced on 28 March and grants are due to be made in May. Delays will affect the profile of outturn spend; HMT approved a subsequent revised baseline spend profile in February 2023.","startDate":"2020-04-01","endDate":"2025-06-30","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2025-06-30. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2025-06-30. This is primarily due to the following factors. All three phases of the programme are launched and being progressed in tandem. The first phase of the fund saw an initial 200 million allocated to all colleges so they could carry out urgent remedial work to refurbish their buildings. Following this, in April 2021 an announcement was made to work in partnership with sixteen colleges with some of the poorest condition sites in the country to upgrade their sites and ensure they are excellent places to learn. Construction is nearly complete at Stafford College and other schemes will soon follow. Through Phase 3 60 FE colleges across the country are to benefit from building and campus upgrades and transformation, helping to level up opportunities for more people. Around 76 projects will be supported to allow colleges to create great buildings and facilities for high-quality training so more people progress into rewarding jobs, and plugging plug skills gaps in local economies. A final allocation of 286million will be made to colleges for them to continue to rebuild and upgrade their facilities.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","themes":["Delivery & schedule","Cost & funding","Commercial & supply chain","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. The Delivery Confidence Assessment is Amber as rated by the external assurance review in January 2023. All three phases of the programme delivery are launched and are…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2025-06-30. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2025-06-30. This is primarily due to the following factors. All three phases of the programme are launched and being progressed in tandem. The first phase of the fund saw an initial 200 million allocated to all colleges so they could carry out urgent remedial work to refurbish their buildings. Following this, in April 2021 an announcement was made to work in partnership with sixteen colleges with some of the poorest condition sites in the country to upgrade their sites and ensure they are excellent places to learn. Construction is nearly complete at Stafford College and other schemes will soon follow. Through Phase 3 60 FE colleges across the country are to benefit from building and campus upgrades and transformation, helping to level up opportunities for more people. Around 76 projects will be supported to allow colleges to create great buildings and facilities for high-quality training so more people progress into rewarding jobs, and plugging plug skills gaps in local economies. A final allocation of 286million will be made to colleges for them to continue to rebuild and upgrade their facilities.","narrativeClaimKind":null},{"id":"DFE_0015_2021-Q3","year":2024,"name":"FE Capital Transformation","department":"DFE","category":"Infrastructure and Construction","description":"The FE capital transformation fund was launched in 2020 to upgrade and transform college estates and create modern, fit-for-purpose spaces that meet the needs of students and communities they serve which was part of the government's manifesto commitment. Delivery was split into three phases: phase 1 gave grant allocations to all eligible FE colleges for urgent repairs and improvements; phase 2 is a DfE centrally delivered rebuilding programme to tackle 16 of the sites in worst condition; phase 3 uses grant funding to support colleges procuring rebuilding and improvement works on their existing estates. The scope of building works across the projects delivered varies greatly, some requiring full rebuilds and some smaller projects carrying out much needed refurbishments and renewal of life-expired building components. Some projects are integral to wider local regeneration initiatives.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The Delivery Confidence Assessment is Amber. Delivery is split into 3 phases, Phase 1 is complete and Phase 2 and 3 are progressing well albeit slightly delayed compared to original forecasts. Managing cost pressure is a key challenge across the programme due to inflationary and market pressures, however active engagement with key stakeholders is supporting the programme affordability challenges and enabling positive progress.","startDate":"2020-04-01","endDate":"2026-03-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 increased from 2025-06-30 to 2026-03-31. This is primarily due to the following factors. The programme comprises multiple rebuilding projects across college campus sites nationwide. We anticipate nearly all projects will be in construction by June 2025, with the new and improved facilities becoming operational by March 2027, to support the government's commitment to level up skills and training opportunities for people across the country.","fyBaseline":0.0,"fyForecast":0.0,"fyVariance":null,"varianceNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","themes":["Commercial & supply chain","Delivery & schedule","Cost & funding","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The Delivery Confidence Assessment is Amber. Delivery is split into 3 phases, Phase 1 is complete and Phase 2 and 3 are progressing well albeit slightly delayed…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 increased from 2025-06-30 to 2026-03-31. This is primarily due to the following factors. The programme comprises multiple rebuilding projects across college campus sites nationwide. We anticipate nearly all projects will be in construction by June 2025, with the new and improved facilities becoming operational by March 2027, to support the government's commitment to level up skills and training opportunities for people across the country.","narrativeClaimKind":null},{"id":"DFE_0015_2021-Q3","year":2025,"name":"FE Capital Transformation","department":"DfE","category":"Infrastructure and Construction","description":"The Further Education (FE) Capital Transformation programme will upgrade and transform the FE college estate. It will support the FE sector to deliver its reform agenda and to support the levelling-up of learner and labour market needs across the country, with greater emphasis on technical education and vocational training.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Section 43 - Commercial interests.","startDate":"2020-04-01","endDate":"2026-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2026. This is primarily due to the following factors‚ The programme comprises multiple rebuilding projects across college campus sites nationwide, with the majority complete by March 2026.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 43 - Commercial interests","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Section 43 - Commercial interests","themes":["Commercial & supply chain","Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Section 43 - Commercial interests. Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2026. This is primarily due to the…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2026. This is primarily due to the following factors‚ The programme comprises multiple rebuilding projects across college campus sites nationwide, with the majority complete by March 2026.","narrativeClaimKind":null},{"id":"DFE_0015_2021-Q3","year":2026,"name":"FE Capital Transformation","department":"DFE","category":"Infrastructure and Construction","description":"The FE Capital Transformation programme, first launched in 2020, was intended to upgrade and transform the further education college estate.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The delivery confidence is Amber and is moving towards Green. With the majority of projects completed or in contract, the risk of procurement pressures across the programme due to inflationary and market pressures has been reduced. This change in delivery confidence is driven by sustained progress in progressing projects into contract and to completion. Active engagement with FE colleges and key stakeholders remains critical to managing any affordability challenges in the projects that are not yet in contract. Looking ahead, progressing the small number of remaining projects into contract is the key priority. These tend to be the most multifaceted projects. Delivery confidence will become green when these schemes proceed into contract mitigating the risk of cost escalation.","startDate":"2020-04-01","endDate":"2029-09-30","scheduleNarrative":"The project's end-date at 25/26-Q4 has changed to 30/09/2029 reflecting the timelines of the small number of remaining multifaceted projects.","fyBaseline":483.95,"fyForecast":487.16,"fyVariance":0.66,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":2057.2,"costNarrative":"Whole Life Costs are based on the latest spending review which was agreed Spring 2025.","benefits":11323.84,"benefitsNarrative":"The key factors in monetising the benefits of the FE Capital Transformation Programme are the number of additional learners due to addressing poor condition estate, and the net present value of an FE aim started by the additional learners.","themes":["Commercial & supply chain","Delivery & schedule","Cost & funding","Approvals & decisions"],"evidenceExcerpt":"The delivery confidence is Amber and is moving towards Green. With the majority of projects completed or in contract, the risk of procurement pressures across the programme due to inflationary and market pressures has been reduced. This change in delivery confidence is driven by sustained progress in progressing projects into contract and to completion.…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 25/26-Q4 has changed to 30/09/2029 reflecting the timelines of the small number of remaining multifaceted projects.","narrativeClaimKind":null}],"previous":{"id":"DFE_0015_2021-Q3","year":2025,"name":"FE Capital Transformation","department":"DfE","category":"Infrastructure and Construction","description":"The Further Education (FE) Capital Transformation programme will upgrade and transform the FE college estate. It will support the FE sector to deliver its reform agenda and to support the levelling-up of learner and labour market needs across the country, with greater emphasis on technical education and vocational training.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Section 43 - Commercial interests.","startDate":"2020-04-01","endDate":"2026-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2026. This is primarily due to the following factors‚ The programme comprises multiple rebuilding projects across college campus sites nationwide, with the majority complete by March 2026.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 43 - Commercial interests","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Section 43 - Commercial interests","themes":["Commercial & supply chain","Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Section 43 - Commercial interests. Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2026. This is primarily due to the…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2026. This is primarily due to the following factors‚ The programme comprises multiple rebuilding projects across college campus sites nationwide, with the majority complete by March 2026.","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":1279,"attentionScore":38,"attentionReasons":["Current published delivery confidence is Amber","Published end date moved 1,279 days later"]},{"id":"MHCLG_0008_2122-Q1","year":2026,"name":"Freeports","department":"MHCLG","category":"Infrastructure and Construction","description":"The Freeports programme aims to catalyse private investment into the UK’s former industrial heartlands, helping transition regional economies towards the sectors of the future and create high-quality jobs for communities. All 12 Freeports are now “open for business”, offering a range of benefits to businesses looking to invest into the UK, including tax reliefs on specific sites, public seed investment (grants) to create investible propositions, and dedicated support for innovation and international trade.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. The rating recognises the Programme’s successful transition from set up into delivery. The most recent (April 2026) assurance review conducted by NISTA confirmed that the Programme has demonstrated substantial progress. All twelve Freeports across England, Scotland and Wales are now operational, with strong public accountable bodies and delivery bodies established, tax sites designated, and activity underway including early investment and business activity on the ground.","startDate":"2019-02-08","endDate":"2030-04-05","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 increased from 31/12/2027 to 05/04/2030 to reflect delivery across Scotland and Wales. England remains unaffected.","fyBaseline":69.77,"fyForecast":69.77,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":378.33,"costNarrative":"The WLC has increased by £66m, due to seed capital grants forecast for Scottish Green Freeports and Welsh Freeports for financial year 2025/26 which are now incorporated within the whole life costs and adjustments for inflation in real terms.. In addition, programme costs have profiled into future financial years until 2029/30 in line with the programme end date.","benefits":null,"benefitsNarrative":"The Freeports programme is expected to deliver a range of long-term benefits, including regeneration, improved skills and labour market outcomes, enhanced infrastructure and transport connectivity, and environmental improvements. Current monitoring appropriately focuses on the delivery of outputs, with established mechanisms in place to track progress against funded activity. While these outputs provide early evidence of delivery, they do not yet represent realised benefits. Formal evaluation of benefits has therefore not yet been undertaken, reflecting the time required for outcomes to materialise. An impact evaluation is planned for later in 2026, with a full evaluation to follow.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Commercial & supply chain"],"evidenceExcerpt":"The SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. The rating recognises the Programme’s successful transition from set up into delivery. The most recent (April 2026) assurance review conducted by NISTA confirmed that the Programme has demonstrated substantial progress. All twelve Freeports across England, Scotland and Wales…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 increased from 31/12/2027 to 05/04/2030 to reflect delivery across Scotland and Wales. England remains unaffected.","narrativeClaimKind":null,"history":[{"id":"MHCLG_0008_2122-Q1","year":2022,"name":"Freeports","department":"DLUHC","category":"Infrastructure and Construction","description":"Freeports are a flagship government programme that will play an important part in the UK's post-Covid economic recovery and contribute to realising the Levelling Up agenda. Freeports will bring together ports, local authorities, businesses and other key local stakeholders to create national hubs for trade, innovation, commerce and global investment; regenerating communities across the UK, attracting new businesses, spreading jobs, investment and opportunity to towns and cities across the country. In March 2021, the Chancellor announced 8 successful prospective Freeports locations in England: East Midlands Airport, Felixstowe & Harwich, Humber, Liverpool City Region, Plymouth & South Devon, Solent, Teesside, and Thames. Subject to business case appraisal, they will be able to access a share of £200 millions of seed capital funding.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 2021/22-Q4 is Amber. We have achieved our goal of delivering at least one operational Freeport by November 2021, and a second became operational in December 2021. This is a complex programme working to challenging deadlines and requires stringent monitoring and collaboration from multiple Government departments. It is likely that Freeports will have staggered operationalisation between November 2021 and June 2022 with Full Business Cases being approved between May and August 2022. This is due to DLUHC making a swift start after the Chancellor's March 2021 statement regarding establishing Freeports. Eight candidates are progressing, working to accelerated delivery dates. The announcement of the first group to pass beyond the Outline Business Cases stage was announced in November but is one step on a complex journey with many political, policy and market-led challenges ahead.","startDate":"2019-02-08","endDate":"2027-12-31","scheduleNarrative":"Your programme end-date is 31 DEC 2027. This is primarily due to the following factors: The Freeports policy is complex and diverse with may technical aspects that need to be addressed prior to a site becoming operational. In March 2021, the Chancellor announced 8 successful prospective Freeports locations in England, as selected following the fair, open and assessment process outlined in the Bidding Prospectus. The 8 English Freeports are progressing through the appraisal stage and are due to move in to the delivery phase of the project during the summer of 2022.","fyBaseline":12.9,"fyForecast":5.1,"fyVariance":-60.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors: The initial profiles submitted at spending review where based on estimates. However the profile agreed at Spending Review (SR) was on the understanding that profiles would be revised once all Full Businesses Cases (FBCs) were appraised, in early 2022. SR profiles will be reviewed in light of revised profiles in FBCs.","wholeLifeCost":225.0,"costNarrative":"Your programme's Baseline Whole Life Cost is 224.80 (£m). This is primarily due to the following factors: This is the Capital and Revenue expenditure as agreed in the 2021 Spending Review. The exact profile of spend will be confirmed when Freeports submit their Full Business Cases.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 2021/22-Q4 is Amber. We have achieved our goal of delivering at least one operational Freeport by November 2021, and a second became operational in December 2021. This is a complex programme working to challenging deadlines and requires stringent monitoring and collaboration…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Your programme end-date is 31 DEC 2027. This is primarily due to the following factors: The Freeports policy is complex and diverse with may technical aspects that need to be addressed prior to a site becoming operational. In March 2021, the Chancellor announced 8 successful prospective Freeports locations in England, as selected following the fair, open and assessment process outlined in the Bidding Prospectus. The 8 English Freeports are progressing through the appraisal stage and are due to move in to the delivery phase of the project during the summer of 2022.","narrativeClaimKind":null},{"id":"MHCLG_0008_2122-Q1","year":2023,"name":"Freeports","department":"DLUHC","category":"Infrastructure and Construction","description":"In March 2021, the Chancellor announced 8 Freeport locations in England: East Midlands, Felixstowe & Harwich (Freeport East), Humber, Liverpool City Region, Plymouth & South Devon, Solent, Teesside and Thames. 7 of the 8 English Freeports have now received final government approvals and, subject to the delivery of agreed milestones, will receive a share of 200m over the coming years. This is in addition to a generous package of tax reliefs for businesses investing in Freeport areas, full local retention of business rates, and a range of support from government. Two Scottish Green Freeport locations were announced on 13/01/23 and two Welsh Freeport locations were announced on 22/03/23, following fair, open competitive processes as outlined in the bidding prospectuses. The Scottish and Welsh Freeports are now progressing through the business case process and are expected to move into the Delivery phase in summer 2024.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. This is a complex programme working to challenging deadlines and requires robust monitoring and collaboration from multiple government departments. Since then, the programme has made significant delivery progress, with7 out of 8 English Freeports now fully approved and up-and-running and the final one expected later in 2023. The responses to the previous Project Assessment Review were provided to the IPA ahead of a Stage Gate 0 assurance review in May 2023.","startDate":"2019-02-08","endDate":"2027-12-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2027-12-31. This is primarily due to the following factors. The Freeports policy is complex and diverse with many technical aspects that need to be addressed prior to a site becoming operational. The English Freeports are moving into the delivery phase with 7 out of the 8 full Business Cases approved. The remaining Full Business Case is expected to be approved later in 2023 when the customs site becomes operational. Two Scottish Green Freeport locations and two Welsh Freeport locations have been selected following fair, open competitive processes, as outlined in the bidding prospectuses. The Scottish and Welsh Freeports are now progressing through the business case process and are expected to move into the Delivery phase in summer 2024. The project end date of 31/12/2027 refers only to the seed funding component of the Freeports programme; other elements are subject to different timeframes.We remain committed to bringing the Freeports policy to Northern Ireland, and discussions continue.","fyBaseline":76.65,"fyForecast":42.65,"fyVariance":-44.0,"varianceNarrative":"The initial profiles submitted at spending review were based on estimates. These are being revised once all Freeport Full Business Cases are approved. 7 of the 8 English Freeports have now received final government approvals. The final Full Business Case is due to be approved in later in 2023 once the customs site designation is complete.The revised business cases meant some spending profiles have been moved further back into the next financial year.","wholeLifeCost":226.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 increased from 225m. to 226m. This is primarily due to the following factors. The capital expenditure was agreed in the Spending Review.It was agreed 25 million seed funding per Freeport, 200 million in total for English Freeports. In addition to monitoring and evaluation and technical support for Freeports.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. The project did not provide departmental-agree monetised benefits at 22/23-Q4. There are currently no monetised benefits for this programme. Benefits will be realised once the programme completes in 2026. The programme will measure success against the objectives of the programme, which can be summarised as; - To increase in trade throughout through the designated Freeport areas. - To increase in investment within Freeport boundary area, surrounding area and nationally. - To increased number of jobs and average wages in deprived areas in and around the Freeport. - To increase in economic specialisation in activities high in Growth Value Added relative to the current makeup of the local economy. - To Increased local involvement and funding in Research and Development and innovation. - To Increased productivity in each target region, through increased capacity to absorb innovation. As benefits are delivered throughout the end of the lifecycle of the project, they will be monitored through evaluation strategy.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. This is a complex programme working to challenging deadlines and requires robust monitoring and collaboration from multiple government departments. Since then, the…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2027-12-31. This is primarily due to the following factors. The Freeports policy is complex and diverse with many technical aspects that need to be addressed prior to a site becoming operational. The English Freeports are moving into the delivery phase with 7 out of the 8 full Business Cases approved. The remaining Full Business Case is expected to be approved later in 2023 when the customs site becomes operational. Two Scottish Green Freeport locations and two Welsh Freeport locations have been selected following fair, open competitive processes, as outlined in the bidding prospectuses. The Scottish and Welsh Freeports are now progressing through the business case process and are expected to move into the Delivery phase in summer 2024. The project end date of 31/12/2027 refers only to the seed funding component of the Freeports programme; other elements are subject to different timeframes.We remain committed to bringing the Freeports policy to Northern Ireland, and discussions continue.","narrativeClaimKind":null},{"id":"MHCLG_0008_2122-Q1","year":2024,"name":"Freeports","department":"DLUHC","category":"Infrastructure and Construction","description":"This programme supports economic growth through the creation of new Freeports across the UK.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. \"As at March 24: We continue to assess the delivery confidence of the programme as amber. _x000D_ _x000D_ The programme continues to focus on IPA recommendations to maximise the success of individual Freeports. \"","startDate":"2019-02-08","endDate":"2027-12-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2027-12-31. This is primarily due to the following factors. As at March 24: The project's end-date is December 2027.","fyBaseline":38.04,"fyForecast":38.04,"fyVariance":0.0,"varianceNarrative":"The budget variance is inferior or equal to 5%.","wholeLifeCost":229.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 increased from 226m. to 229m. This is primarily due to the following factors. Whole life costs have increased from 226m to 229m due to technical support required in the Devolved Administrations.","benefits":0.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 0m. Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 0m.","themes":["Cost & funding","Delivery & schedule","Technical & integration"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. \"As at March 24: We continue to assess the delivery confidence of the programme as amber. _x000D_ _x000D_ The programme continues to focus on IPA recommendations to…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2027-12-31. This is primarily due to the following factors. As at March 24: The project's end-date is December 2027.","narrativeClaimKind":null},{"id":"MHCLG_0008_2122-Q1","year":2025,"name":"Freeports","department":"MHCLG","category":"Infrastructure and Construction","description":"The Freeports programme aims to catalyse private investment into the UK’s former industrial heartlands, helping transition regional economies towards the sectors of the future, such as renewables, and create long-term, high-quality jobs for local communities. Freeports therefore have an important role to play in this government’s growth and clean energy missions, as set out in our recently published Industrial Strategy. Sites in all 12 Freeports have now been designated, meaning companies can benefit from a range of reliefs on new investment and job creation in Freeport areas. In addition, these locations will see an ambitious programme of public investment, including £300m capital funding and long-term local retention and reinvestment of business rates, as well as dedicated support for innovation and international trade. Freeports have already generated £6.4 billion in private investment, 89% of which is foreign direct investment. The capital funding element of the programme is forecast to complete by 2027/28; however tax reliefs and business rate retention will continue beyond this date.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The previous assurance review noted that the programme is rated as ‘Amber’ and on an upward trajectory from last year with much good progress demonstrated. It noted that the programme has successfully transitioned from a set-up phase into delivery and that governance structures have adapted to reflect the demands of delivery. Significant milestones have been achieved with all eight English Freeports having passed the business case approval stage and are moving into delivery on the ground with established tax sites and the beginnings of investment happening. The programme has made significant progress in addressing the recommendations from the previous assurance review including work to adapt the policy and formally re-engage departments in the programme. Further work is taking place to support the Scottish Green Freeports and Welsh Freeports to begin to move out of set-up into delivery.","startDate":"2019-02-08","endDate":"2027-12-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/12/2027. This is primarily due to the following factors‚ The project end date remains 31/12/2027.","fyBaseline":87.28,"fyForecast":87.28,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":256.3,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 229 to 256. This is primarily due to the following factors‚ Seed capital grants forecast for Scottish Green Freeports and Welsh Freeports for financial year 2025/26 which were not previously captured; in addition, programme costs have profiled into financial year 2025/26 in line with the programme end date.","benefits":null,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ The Freeports programme will provide a range of benefits through the delivery of regeneration, skills and labour market, infrastructure and transport, and environmental benefits.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The previous assurance review noted that the programme is rated as ‘Amber’ and on an upward trajectory from last year with much good progress demonstrated. It noted…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/12/2027. This is primarily due to the following factors‚ The project end date remains 31/12/2027.","narrativeClaimKind":null},{"id":"MHCLG_0008_2122-Q1","year":2026,"name":"Freeports","department":"MHCLG","category":"Infrastructure and Construction","description":"The Freeports programme aims to catalyse private investment into the UK’s former industrial heartlands, helping transition regional economies towards the sectors of the future and create high-quality jobs for communities. All 12 Freeports are now “open for business”, offering a range of benefits to businesses looking to invest into the UK, including tax reliefs on specific sites, public seed investment (grants) to create investible propositions, and dedicated support for innovation and international trade.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. The rating recognises the Programme’s successful transition from set up into delivery. The most recent (April 2026) assurance review conducted by NISTA confirmed that the Programme has demonstrated substantial progress. All twelve Freeports across England, Scotland and Wales are now operational, with strong public accountable bodies and delivery bodies established, tax sites designated, and activity underway including early investment and business activity on the ground.","startDate":"2019-02-08","endDate":"2030-04-05","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 increased from 31/12/2027 to 05/04/2030 to reflect delivery across Scotland and Wales. England remains unaffected.","fyBaseline":69.77,"fyForecast":69.77,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":378.33,"costNarrative":"The WLC has increased by £66m, due to seed capital grants forecast for Scottish Green Freeports and Welsh Freeports for financial year 2025/26 which are now incorporated within the whole life costs and adjustments for inflation in real terms.. In addition, programme costs have profiled into future financial years until 2029/30 in line with the programme end date.","benefits":null,"benefitsNarrative":"The Freeports programme is expected to deliver a range of long-term benefits, including regeneration, improved skills and labour market outcomes, enhanced infrastructure and transport connectivity, and environmental improvements. Current monitoring appropriately focuses on the delivery of outputs, with established mechanisms in place to track progress against funded activity. While these outputs provide early evidence of delivery, they do not yet represent realised benefits. Formal evaluation of benefits has therefore not yet been undertaken, reflecting the time required for outcomes to materialise. An impact evaluation is planned for later in 2026, with a full evaluation to follow.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Commercial & supply chain"],"evidenceExcerpt":"The SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. The rating recognises the Programme’s successful transition from set up into delivery. The most recent (April 2026) assurance review conducted by NISTA confirmed that the Programme has demonstrated substantial progress. All twelve Freeports across England, Scotland and Wales…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 increased from 31/12/2027 to 05/04/2030 to reflect delivery across Scotland and Wales. England remains unaffected.","narrativeClaimKind":null}],"previous":{"id":"MHCLG_0008_2122-Q1","year":2025,"name":"Freeports","department":"MHCLG","category":"Infrastructure and Construction","description":"The Freeports programme aims to catalyse private investment into the UK’s former industrial heartlands, helping transition regional economies towards the sectors of the future, such as renewables, and create long-term, high-quality jobs for local communities. Freeports therefore have an important role to play in this government’s growth and clean energy missions, as set out in our recently published Industrial Strategy. Sites in all 12 Freeports have now been designated, meaning companies can benefit from a range of reliefs on new investment and job creation in Freeport areas. In addition, these locations will see an ambitious programme of public investment, including £300m capital funding and long-term local retention and reinvestment of business rates, as well as dedicated support for innovation and international trade. Freeports have already generated £6.4 billion in private investment, 89% of which is foreign direct investment. The capital funding element of the programme is forecast to complete by 2027/28; however tax reliefs and business rate retention will continue beyond this date.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The previous assurance review noted that the programme is rated as ‘Amber’ and on an upward trajectory from last year with much good progress demonstrated. It noted that the programme has successfully transitioned from a set-up phase into delivery and that governance structures have adapted to reflect the demands of delivery. Significant milestones have been achieved with all eight English Freeports having passed the business case approval stage and are moving into delivery on the ground with established tax sites and the beginnings of investment happening. The programme has made significant progress in addressing the recommendations from the previous assurance review including work to adapt the policy and formally re-engage departments in the programme. Further work is taking place to support the Scottish Green Freeports and Welsh Freeports to begin to move out of set-up into delivery.","startDate":"2019-02-08","endDate":"2027-12-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/12/2027. This is primarily due to the following factors‚ The project end date remains 31/12/2027.","fyBaseline":87.28,"fyForecast":87.28,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":256.3,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 229 to 256. This is primarily due to the following factors‚ Seed capital grants forecast for Scottish Green Freeports and Welsh Freeports for financial year 2025/26 which were not previously captured; in addition, programme costs have profiled into financial year 2025/26 in line with the programme end date.","benefits":null,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ The Freeports programme will provide a range of benefits through the delivery of regeneration, skills and labour market, infrastructure and transport, and environmental benefits.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The previous assurance review noted that the programme is rated as ‘Amber’ and on an upward trajectory from last year with much good progress demonstrated. It noted…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/12/2027. This is primarily due to the following factors‚ The project end date remains 31/12/2027.","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":826,"attentionScore":38,"attentionReasons":["Current published delivery confidence is Amber","Published end date moved 826 days later"]},{"id":"DFT_0022_1415-Q4","year":2026,"name":"LOWER THAMES CROSSING","department":"DFT","category":"Infrastructure and Construction","description":"The Lower Thames Crossing (LTC) is a proposed new road connecting Kent, Thurrock and Essex through twin-bored tunnels under the River Thames. It will almost double the road capacity across the River Thames east of London and is the largest single road investment project in the UK since the M25 was completed more than 30 years ago. As a vital part of the UK’s transport infrastructure, it will act as a catalyst for national and local economic growth. Building a reliable, modern new road that is fit for the future will help connect the nation's busiest ports to the distribution hubs in the North, Midlands and beyond. It will improve network resilience and the performance of the existing crossings at Dartford, transforming the regional and national road network. The LTC will open up new markets for businesses and create tens of thousands of new jobs and hundreds of apprenticeships during its construction. At Autumn Budget 2025 it was confirmed that the Government's preferred financing option at this stage of the project is the Regulated Asset Base (RAB) model which will allow for a regulated private entity to finance, build, operate, and maintain the asset under long-term oversight by an independent regulator. Under the RAB model, operations of the Dartford Crossing would transfer to a new regulated private sector entity, which would be responsible for operating and maintaining both the Dartford Crossing and the new LTC. The project therefore now incorporates the work required to create the legislative, regulatory and commercial framework for the RAB model.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 improved from Amber to Green. This is primarily due to the following factors‚ The LTC project secured additional public funding with £1.66bn in the Third Road Investment Strategy for the years 2026/27 and 2028/29 which includes the £891m announced at Autumn Budget 2025 and funding previously committed for those years. The Government also confirmed in 25/26 that the preferred finance model at this stage of the project is the Regulated Asset Base (RAB) model. This strengthens confidence in delivery and steps are being taken to prepare for a transaction with the private sector. The NISTA DCA rating for 25/26 Q4 is Amber, whilst we recognise that there are still risks to delivery, the SRO is content that sufficient mitigations were in place as of March-26 and therefore rated the DCA as Green. The project DCA is reviewed monthly. The Outline Business Case was updated and approved by the DfT Investment Committee in October 2025. This marks the transition from full public sector funding to a future private sector RAB model, with the private sector to deliver the remainder of the scheme and take on Dartford Crossing operations in 2028. The DfT team working on the project has expanded to reflect the new work required on legislation and regulation, and the SRO role during 25/26 moved from National Highways to DfT to reflect this broader scope.","startDate":"2014-05-30","endDate":"2035-07-31","scheduleNarrative":"The project was granted Development Consent on 25 March 2025. The project was re-baselined in October 2025 to inform Autumn Budget 2025 decision making where the Regulated Asset Base (RAB) model was selected as the preferred financing model. An Accounting Officer Assessment was undertaken to support this decision. The project remains on course to deliver as set out at Autumn Budget. We expect the existing Dartford Crossing and LTC project to move from public to private ownership in 2028. The main tunnelling phase for the LTC is expected to begin in 2028 and the target date for the road to be open for traffic is the early to mid-2030’s .","fyBaseline":338.05,"fyForecast":338.05,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":9899.54,"costNarrative":"Compared to financial year 24/25-Q4, the projects departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) increased from £8950,220m to £10629,020m. This is primarily due to schedule delay, the first delay was due to affordability and planning consent delays as set out in the Written Ministerial Statement issued 9 March 2023 which re-phased construction by 2 Years. A further delay to the DCO decision was announced by the Secretary of State in October 2024 extended the decision deadline to May 2025. The cost increase incorporates the prolongation and inflationary impacts following these two schedule delays which required the project to re-baseline. It should be noted that it is the intention to split the Whole Life Cost between both Public and Private finance under the Regulated Asset Base model. The transition to private finance is currently expected to occur in 2028. To note: the figures in the Annual Assessment may differ to those in this narrative due to NISTA deflating costs forecast for later years.","benefits":1816.27,"benefitsNarrative":"The current approved benefits at 25/26-Q4 remained at £3,009m. This figure is based on the project being fully publicly funded and is now outdated due to the approval to move to a Regulated Asset Base (RAB) model. The VfM analysis will continue to develop as detail on policy assumptions evolves, alongside any updates to our appraisal approach. For example, the department has made the decision to take forward LTC on the basis of the Regulated Asset Base model (RAB) and has published its intention to adopt new, higher values of time for freight movements. The strategic case for the LTC project remains strong. As well as the connectivity and congestion relieving benefits delivered by the new crossing, which leads to major economic benefits, this is also based around the escalating need for maintenance of the Dartford Crossing. The Dartford Crossing is already operating significantly over capacity and suffers from poor reliability. As with any major project, there are significant risks to be managed in order to realise the project’s benefits. We will continue to work with NISTA and apply lessons from the James Stewart review of High Speed 2 to help minimise those risks. Further work will be completed in the next stages of the programme up to FBC at which point the accounting officer assessment will be refreshed. As the benefits are expected to be felt for several decades, the figures in the Annual Assessment may differ to those in this narrative due to NISTA deflating benefits post 2050.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 improved from Amber to Green. This is primarily due to the following factors‚ The LTC project secured additional public funding with £1.66bn in the Third Road Investment Strategy for the years 2026/27 and 2028/29 which includes the £891m announced at Autumn…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project was granted Development Consent on 25 March 2025. The project was re-baselined in October 2025 to inform Autumn Budget 2025 decision making where the Regulated Asset Base (RAB) model was selected as the preferred financing model. An Accounting Officer Assessment was undertaken to support this decision. The project remains on course to deliver as set out at Autumn Budget. We expect the existing Dartford Crossing and LTC project to move from public to private ownership in 2028. The main tunnelling phase for the LTC is expected to begin in 2028 and the target date for the road to be open for traffic is the early to mid-2030’s .","narrativeClaimKind":null,"history":[{"id":"DFT_0022_1415-Q4","year":2020,"name":"Lower Thames Crossing","department":"DFT","category":"Infrastructure and Construction","description":"A new free-flowing road crossing of the Lower Thames east of Gravesend and Tilbury. It will improve network resilience and the performance of the existing crossings at Dartford enabling local regional and national economic growth.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber, which has not changed since last year�s Q2 1819 Amber, due primarily to the following factors; - The project schedule is extremely tight with multiple critical paths and constrained timescales to support a 2027 Open for Traffic (OfT) date. Further work is needed to validate elements of the schedule, particularly how schedule risk and opportunity is handled, and to ensure it is robust. - Further market engagement is required to validate some of the assumptions in the Commercial case, including the proposed commercial model. This engagement needs to target non-UK suppliers, verify the construction programme and validate the contracting strategy and procurement process - The concurrency of key dates for the procurement and DCO schedule are sensitive to one another. There is a risk around completing dialogue before close of DCO examination which is being considered as part of a review of the schedule Since the Q2 1920 (30th September 2019) Amber IPA DCA, the following non-project operating environment activities have impacted the original Q2 IPA DCA; - In March 2020 the Chancellor, as part of the Budget settlement, announced that the project would be fully publicly funded. It was previously announced in October 2018 that private funding would not be used to partly fund the project. Since the Q2 1920 (30th September 2019) Amber IPA DCA, the following primary project actions have impacted the original Q2 IPA DCA; - A baseline (cost, schedule & risk) review of the project was undertaken in late 2019, which was approved by DfT in December 2019. - Further ground investigation have been undertaken to feed into the development of the projects schedule and cost assumptions","startDate":"2014-05-30","endDate":"2028-07-31","scheduleNarrative":"The scheduled baseline project end date at Q2 1920 (30th September 2019) is 31/07/28, has not changed since last year's Q2 1819 date of 31/07/28, due primarily to the following factors; - Certainty of RIS 2 funding and confirmation of funding to replace that which was to be privately financed - Following the removal of the constraints imposed by being partly privately funded (including contract packaging) the project has updated, strengthened and externally assured our Commercial Procurement Strategy which de-risks the schedule. - The outcome of market engagement which will confirm if our assumptions regarding timescales and cost are realistic for the tunnelling work Since the Q2 1920 (30th September 2019) baseline project end date of 31/07/28, the following non-project operating environment activities have impacted the original Q2 baseline project end date; - The corona virus pandemic is impacting on project delivery. We have implemented business continuity plans and our IT platforms allow office staff to effectively work at home. However Covid-19 prevention measures are impacting on ground investigation and other early works. There are also indirect consequences on the schedule as a result of the effect on the construction market which are likely to affect the procurement process. - The project have introduced a baseline schedule range of December 2027 to November 2028. The likely project end date is 7 months after this to accommodate project close down activities. Since the Q2 1920 (30th September 2019) baseline project end date of 31/07/28, the following primary project actions have impacted the original Q2 baseline project end date; - A full review of the schedule is underway to validate the likely project timeline given a number of factors including the impact of Covid 19. The outcome of this work is expected in summer 2020. - As part of the review of the schedule we are considering the timing of the main works procurements as compared to the DCO examination and award dates. This is to derisk the procurement activity by providing sufficient certainty to bidders","fyBaseline":165.0,"fyForecast":165.0,"fyVariance":0.0,"varianceNarrative":"Budget variance less than 5%","wholeLifeCost":6052.2,"costNarrative":"The baseline Whole Life Cost at Q2 1920 (30th September 2019) is �6,052.20 m, has increased on last year's Q2 1819 (�m) baseline Whole Life Cost, due primarily to the following factors; - The increase is due to the addition of portfolio risk to the previously approved cost (in line with HE policy) and an increase in non-recoverable VAT following the move from private to public finance for the link roads. Since Q2 1920 DfT has approved a further update to the Whole Life Cost and the latest approved position is �6,391m. Since the Q2 1920 (30th September 2019) �6,052.20 m baseline Whole Life Cost, the following non-project operating environment activities have impacted the original baseline Q2 Whole Life Cost; - The delays caused by Covid19 will impact inflation Since the Q2 1920 (30th September 2019) �6,052.20 m baseline Whole Life Cost, the following primary project actions have impacted the original Q2 baseline Whole Life Cost; - In line with Highways England Policy, portfolio risk has been added. This along with design changes (Removal of Tilbury Junction including Rest and Service Area including associated viaduct works) were submitted for approval to DfT in December 2019. - Since December 2019, we have made further design changes for safety and following consultation feedback. We have also updated the schedule to incorporate feedback from a number of independent reviews. These changes may increase the inflation included in the whole life cost.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Governance & assurance"],"evidenceExcerpt":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber, which has not changed since last year�s Q2 1819 Amber, due primarily to the following factors; - The project schedule is extremely tight with multiple critical paths and constrained timescales to support a 2027 Open for Traffic (OfT) date. Further work is needed…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2020","sourceLabel":"IPA Annual Report 2019-20","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The scheduled baseline project end date at Q2 1920 (30th September 2019) is 31/07/28, has not changed since last year's Q2 1819 date of 31/07/28, due primarily to the following factors; - Certainty of RIS 2 funding and confirmation of funding to replace that which was to be privately financed - Following the removal of the constraints imposed by being partly privately funded (including contract packaging) the project has updated, strengthened and externally assured our Commercial Procurement Strategy which de-risks the schedule. - The outcome of market engagement which will confirm if our assumptions regarding timescales and cost are realistic for the tunnelling work Since the Q2 1920 (30th September 2019) baseline project end date of 31/07/28, the following non-project operating environment activities have impacted the original Q2 baseline project end date; - The corona virus pandemic is impacting on project delivery. We have implemented business continuity plans and our IT platforms allow office staff to effectively work at home. However Covid-19 prevention measures are impacting on ground investigation and other early works. There are also indirect consequences on the schedule as a result of the effect on the construction market which are likely to affect the procurement process. - The project have introduced a baseline schedule range of December 2027 to November 2028. The likely project end date is 7 months after this to accommodate project close down activities. Since the Q2 1920 (30th September 2019) baseline project end date of 31/07/28, the following primary project actions have impacted the original Q2 baseline project end date; - A full review of the schedule is underway to validate the likely project timeline given a number of factors including the impact of Covid 19. The outcome of this work is expected in summer 2020. - As part of the review of the schedule we are considering the timing of the main works procurements as compared to the DCO examination and award dates. This is to derisk the procurement activity by providing sufficient certainty to bidders","narrativeClaimKind":null},{"id":"DFT_0022_1415-Q4","year":2021,"name":"Lower Thames Crossing","department":"DFT","category":"Infrastructure and Construction","description":"The Lower Thames Crossing (LTC) is a proposed new expressway connecting Kent, Thurrock and Essex through twin bored tunnels under the Thames. It will almost double the road capacity across the River Thames east of London and is the largest single road investment project in the UK since the M25 was completed more than 30 years ago. As a vital part of the UK's transport infrastructure, it will act as a catalyst for national and local economic growth. Building a reliable, modern new road that is fit for the future will help connect the nation's busiest ports to the distribution hubs in the North, Midlands and beyond. It will improve network resilience and the performance of the existing crossings at Dartford, transforming the regional and national road network. LTC will open up new markets for businesses and create tens of thousands of new jobs and hundreds of apprenticeships during its construction.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber. This is primarily due to the following factors: Lower Thames Crossing (LTC) continues to progress well on several fronts. The three tenderers for the Tunnels contract have been announced and contract notices issued for the two Roads contracts. The programme has successfully transitioned to a separate Highways England Directorate, with its Executive Director reporting directly to the Chief Executive. A strengthened Client Team has been established with all senior roles in place. An Integration Partner to support the Programme has been appointed and is currently mobilising. Following advice from the Planning Inspectorate (PINS), the Development Consent Order (DCO) application was withdrawn. There has been significant engagement with key stakeholders including affected local authorities. A further Public Consultation will commence in Summer with DCO resubmission in late 2021. The cost and schedule impact of the withdrawal will be finalised during the summer. Following an Assurance Action Plan Review the IPA improved its DCA to Amber, which, while reflecting the programme's progress, notes the current DCO position.","startDate":"2014-05-30","endDate":"2029-05-31","scheduleNarrative":"Compared to financial year 19/20-Q2, the project's end-date increased from 31 July 2028 to 31 May 2029 . This is primarily due to the following factors: A rebaseline exercise was undertaken which was fully externally assured. The project was requested by the Major Projects Review Group (MPRG) and DfT to rebaseline without the constraint of a defined completion date. This aligns with the 'Lessons from transport for the sponsorship of major projects' (2019) which recommends that an evidenced range should be used rather than a single target date. The cost and schedule impact of the withdrawal will be finalised during the summer.","fyBaseline":245.0,"fyForecast":246.3,"fyVariance":1.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":6391.04,"costNarrative":"Compared to financial year 19/20-Q2, the projects Baseline Whole Life Cost increased from �5692.07m to �6391.04m. This is primarily due to the following factors: The baseline cost increase reflects the maturing and further development of both the design and the associated costs partly driven by the results of ground investigation. These changes include the need to further mitigate the adverse environmental impacts, most noticeably moving the southern portal to negate risk to the internationally protected wetland south of the River Thames and an increased land requirement. There was also a re-evaluation of the costs of moving nationally significant infrastructure including high pressure gas mains, high voltage power lines and global banking data lines. A number of independent reviews were undertaken to assure the updated baseline cost.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Scope & requirements","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber. This is primarily due to the following factors: Lower Thames Crossing (LTC) continues to progress well on several fronts. The three tenderers for the Tunnels contract have been announced and contract notices issued for the two…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 19/20-Q2, the project's end-date increased from 31 July 2028 to 31 May 2029 . This is primarily due to the following factors: A rebaseline exercise was undertaken which was fully externally assured. The project was requested by the Major Projects Review Group (MPRG) and DfT to rebaseline without the constraint of a defined completion date. This aligns with the 'Lessons from transport for the sponsorship of major projects' (2019) which recommends that an evidenced range should be used rather than a single target date. The cost and schedule impact of the withdrawal will be finalised during the summer.","narrativeClaimKind":null},{"id":"DFT_0022_1415-Q4","year":2022,"name":"Lower Thames Crossing","department":"DFT","category":"Infrastructure and Construction","description":"The Lower Thames Crossing (LTC) is a proposed new expressway connecting Kent, Thurrock and Essex through twin-bored tunnels under the Thames. It will almost double the road capacity across the River Thames east of London and is the largest single road investment project in the UK since the M25 was completed more than 30 years ago. As a vital part of the UK's transport infrastructure, it will act as a catalyst for national and local economic growth. Building a reliable, modern new road that is fit for the future will help connect the nation's busiest ports to the distribution hubs in the North, Midlands and beyond. it will improve network resilience and the performance of the existing crossings at Dartford, transforming the regional and national road network. LTC will open up new markets for businesses and create tens of thousands of new jobs and hundreds of apprenticeships during its construction.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 remained at Amber Compared to financial year 20/21-Q4, the project's rating remained at Amber. This is primarily due to the following factors: this reflects the continued focus from National Highways on submission of the Development Consent Order (DCO) for Lower Thames Crossing (LTC) and working with stakeholders to both promote the scheme and mitigate any risks & impacts. National Highways announced earlier this year that the LTC would be a pathfinder project towards carbon neutral construction. National Highways adjusted its scope for the LTC to allow the full opportunity that the Thames Freeport enables, working closely with the Port of Tilbury. National Highways aims to submit the DCO for the LTC later this year. Alongside the focus on the DCO, National Highways is continuing to progress the procurement programme to minimise the impact of recent delays, maintaining market engagement and enabling greater co-ordination across the three Main Works Contracts to maximise the social and environmental outcomes.","startDate":"2014-05-30","endDate":"2029-05-31","scheduleNarrative":"Compared to 2021-Q4, your project end-date remained scheduled to finish on 31 MAY 2029 . This is primarily due to the following factors: This reflects the continued focus from National Highways on DCO re-submission and the National Highways Community Impacts Consultation in July 2021 where National Highways adjusted its scope for LTC to allow the full opportunity that the Thames Freeport enables to be realised, working closely with the Port of Tilbury and Thurrock Council. This requires a further round of public consultation on the LTC from 12 May - 20 June and National Highways plans to submit the application for a DCO later this year.","fyBaseline":295.0,"fyForecast":150.7,"fyVariance":-49.0,"varianceNarrative":"The budget variance is less than 5% due to the in-year spend being £144.3m less than baseline. Planned works have been deferred to reduce committed spend reducing overall outturn following the delayed DCO submission.","wholeLifeCost":6752.0,"costNarrative":"Compared to2021-Q4, the projects Baseline Whole Life Cost increased from 6391.04 (£m) to 6752.00 (£m). This is primarily due to the following factors: The inflationary impacts of the construction works were delayed following the withdrawal of the Development Consent Order for the LTC. Whilst the baseline is the latest assured position, a new programme estimate is currently being undertaken and due for completion in Q2. This will include some additional costs to the baseline which take into account the impact of accommodating the Thames Freeport and subsequent inflationary impacts. National Highways expect the underlying base costs to not have materially changed. A number of independent reviews are being undertaken to assure the updated baseline cost.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 remained at Amber Compared to financial year 20/21-Q4, the project's rating remained at Amber. This is primarily due to the following factors: this reflects the continued focus from National Highways on submission of the Development…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to 2021-Q4, your project end-date remained scheduled to finish on 31 MAY 2029 . This is primarily due to the following factors: This reflects the continued focus from National Highways on DCO re-submission and the National Highways Community Impacts Consultation in July 2021 where National Highways adjusted its scope for LTC to allow the full opportunity that the Thames Freeport enables to be realised, working closely with the Port of Tilbury and Thurrock Council. This requires a further round of public consultation on the LTC from 12 May - 20 June and National Highways plans to submit the application for a DCO later this year.","narrativeClaimKind":null},{"id":"DFT_0022_1415-Q4","year":2023,"name":"Lower Thames Crossing","department":"DFT","category":"Infrastructure and Construction","description":"The Lower Thames Crossing (LTC) is a proposed new expressway connecting Kent, Thurrock and Essex through twin-bored tunnels under the Thames. It will almost double the road capacity across the River Thames east of London and is the largest single road investment project in the UK since the M25 was completed more than 30 years ago. As a vital part of the UKs transport infrastructure, it will act as a catalyst for national and local economic growth. Building a reliable, modern new road that is fit for the future will help connect the nations busiest ports to the distribution hubs in the North, Midlands and beyond. It will improve network resilience and the performance of the existing crossings at Dartford, transforming the regional and national road network. LTC will open up new markets for businesses and create tens of thousands of new jobs and hundreds of apprenticeships during its construction.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. The key strategic risks remain mainly around the consenting process and loss of momentum. The current risk profile of the programme is being reviewed to understand the implications of the Ministerial Statement issued on the 9 March 2023 confirming government commitment to the Programme and that construction would be rephased by two years, against the current approved baseline given the wider fiscal pressures on capital investment from inflation.Compared to financial year 21/22-Q4, the programmes DCA remains at Amber due to the Ministerial Statement, pressures on capital investment from inflation, and the Development Consent Order","startDate":"2014-05-30","endDate":"2032-03-10","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 increased from 2029-05-31 to 2032-03-10. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 increased from 2029-05-31 to 2032-03-10. This is primarily due to the following factors. The date is within the original range we expected. The written ministerial statement has increased the range to the upper end which has been included in the forecast. The Ministerial Statement issued on the 9 March 2023 confirmed government commitment to the Programme and that construction would be rephased by two years, against the current approved baseline given the wider fiscal pressures on capital investment from inflation. The project will continue to work through what the announcement means for the schedule and the project end date.","fyBaseline":129.3,"fyForecast":169.3,"fyVariance":31.0,"varianceNarrative":"The budget variance is due to advancing the acquisition of Southern Valley Golf Course, Port of Tilbury Land and Pilgrims Lane lease.","wholeLifeCost":8309.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 increased from 6752m. to 8309m. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 increased from 6752m. to 8309m. This is primarily due to the following factors. The cost increases are primarily linked to the Freeport changes, DCO delay, inflation and prolongation costs. This figure is is the Most Likely capex cost in outturn prices.","benefits":4313.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 4313m. Work is ongoing to update the benefits following submission of the DCO to inform Government's final investment decision and following the Written Ministerial Statement on 9 March 2023, which confirmed that the construction of LTC would be re-phased by two years due to wider pressure on the RIS, driven by high inflation. Benefits are expressed in 2010 prices and values.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. The key strategic risks remain mainly around the consenting process and loss of momentum. The current risk profile of the programme is being reviewed to understand…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 increased from 2029-05-31 to 2032-03-10. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 increased from 2029-05-31 to 2032-03-10. This is primarily due to the following factors. The date is within the original range we expected. The written ministerial statement has increased the range to the upper end which has been included in the forecast. The Ministerial Statement issued on the 9 March 2023 confirmed government commitment to the Programme and that construction would be rephased by two years, against the current approved baseline given the wider fiscal pressures on capital investment from inflation. The project will continue to work through what the announcement means for the schedule and the project end date.","narrativeClaimKind":null},{"id":"DFT_0022_1415-Q4","year":2024,"name":"Lower Thames Crossing","department":"DFT","category":"Infrastructure and Construction","description":"The Lower Thames Crossing (LTC) is a proposed new expressway connecting Kent, Thurrock and Essex through twin-bored tunnels under the Thames. It will almost double the road capacity across the River Thames east of London and is the largest single road investment project in the UK since the M25 was completed more than 30 years ago. As a vital part of the UKs transport infrastructure, it will act as a catalyst for national and local economic growth. Building a reliable, modern new road that is fit for the future will help connect the nation's busiest ports to the distribution hubs in the North, Midlands and beyond. It will improve network resilience and the performance of the existing crossings at Dartford, transforming the regional and national road network. LTC will open up new markets for businesses and create tens of thousands of new jobs and hundreds of apprenticeships during its construction.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The key strategic risks remain mainly the consenting process and loss of momentum. The project will be updating its overall cost and schedule in line with the Written Ministerial Statement as the project manages the Written Ministerial Statement, plus the pressures on capital investment from inflation, the continuing Development Consent Order process, and the complexity of the activity needed to enable a funding investment decision.","startDate":"2014-05-30","endDate":"2034-04-20","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 increased from 2032-03-10 to 2034-04-20. This is primarily due to the following factors. The Written Ministerial Statement issued on the 9 March 2023 confirmed government commitment to the Programme and that construction would be rephased by two years, against the current approved baseline. This was to allow more time to take into account stakeholder views and prepare an effective and deliverable plan, while helping to meet wider inflationary pressures. The project has now re-baselined to reflect the March 2023 Written Ministerial Statement.","fyBaseline":148.0,"fyForecast":148.0,"fyVariance":0.0,"varianceNarrative":"The budget variance is inferior or equal to 5%.","wholeLifeCost":8950.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 increased from 8309m. to 8950m. This is primarily due to the following factors. This is primarily due to the following factors, inflation, and prolongation costs. This figure is the Most Likely capex cost in outturn prices.","benefits":3009.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 2324-Q4 decreased from 4313m. to 3009m. The project's departmental-agree monetised benefits at 23/24-Q4 is 3009m._x000D_ The programme has produced an early draft of the Full Business Case (FBC) Strategic, Economic, Commercial and Management Dimensions. _x000D_ The economic analysis has been updated for revised Transport Analysis Guidance (TAG) guidelines, carbon costs/benefits and strategic benefits. Additional analysis on freight valuations and sensitivity tests has been undertaken. The analysis has used the existing approved cost profile of 8095m.","themes":["Cost & funding","Approvals & decisions","Commercial & supply chain","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The key strategic risks remain mainly the consenting process and loss of momentum. The project will be updating its overall cost and schedule in line with the Written…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 increased from 2032-03-10 to 2034-04-20. This is primarily due to the following factors. The Written Ministerial Statement issued on the 9 March 2023 confirmed government commitment to the Programme and that construction would be rephased by two years, against the current approved baseline. This was to allow more time to take into account stakeholder views and prepare an effective and deliverable plan, while helping to meet wider inflationary pressures. The project has now re-baselined to reflect the March 2023 Written Ministerial Statement.","narrativeClaimKind":null},{"id":"DFT_0022_1415-Q4","year":2025,"name":"LOWER THAMES CROSSING","department":"DfT","category":"Infrastructure and Construction","description":"The Lower Thames Crossing (LTC) is a proposed new expressway connecting Kent, Thurrock and Essex through twin-bored tunnels under the Thames. It will almost double the road capacity across the River Thames east of London and is the largest single road investment project in the UK since the M25 was completed more than 30 years ago. As a vital part of the UKs transport infrastructure, it will act as a catalyst for national and local economic growth. Building a reliable, modern new road that is fit for the future will help connect the nation's busiest ports to the distribution hubs in the North, Midlands and beyond. It will improve network resilience and the performance of the existing crossings at Dartford, transforming the regional and national road network. LTC will open up new markets for businesses and create tens of thousands of new jobs and hundreds of apprenticeships during its construction.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The DCO decision date was the subject of a Written Ministerial Statement and was extended from the 4 October 2024 until 23 May 2025, with consent granted on 25 March 2025. The key strategic risks remain mainly on the complexity of the activity needed to take the Project through to future funding decisions.","startDate":"2014-05-30","endDate":"2034-04-20","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 20/04/2034. This is primarily due to the following factors‚ The project was subject to a Written Ministerial Statement on the 9 March 2023 re-phasing construction by 2 Years. The programme was re-baselined to reflect the March 2023 Written Ministerial Statement. This had a direct impact on the Open for Traffic date. This baseline is no longer viable after a second Written Ministerial Statement was issued on the 4 October 2024 extending the Development Consent Order Decision date until 23 May 2025 in order to allow more time for the application to be considered further, including as part of the spending review [Development Consent Order Consent granted 25 March 2025]. The project is currently working on the impact to the Open for Traffic following the second Written Ministerial Statement.","fyBaseline":203.0,"fyForecast":203.0,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":8950.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 8950. This is primarily due to the following factors‚ The project's departmentally agreed Whole Life Cost at 24/25-Q4 is 8950m. The project is currently forecasting within the approved budget. The spending review 2025 and the formal decision on the preferred funding option could impact the whole life costs of the project.","benefits":3009.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 3009. This is primarily due to the following factors‚ The departmentally agreed Benefits at 24/25-Q4 remained at 3009m. Formal decision on the preferred funding option could impact the benefits.","themes":["Cost & funding","Approvals & decisions","Governance & assurance","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The DCO decision date was the subject of a Written Ministerial Statement and was extended from the 4 October 2024 until 23 May 2025, with consent granted on 25 March…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 20/04/2034. This is primarily due to the following factors‚ The project was subject to a Written Ministerial Statement on the 9 March 2023 re-phasing construction by 2 Years. The programme was re-baselined to reflect the March 2023 Written Ministerial Statement. This had a direct impact on the Open for Traffic date. This baseline is no longer viable after a second Written Ministerial Statement was issued on the 4 October 2024 extending the Development Consent Order Decision date until 23 May 2025 in order to allow more time for the application to be considered further, including as part of the spending review [Development Consent Order Consent granted 25 March 2025]. The project is currently working on the impact to the Open for Traffic following the second Written Ministerial Statement.","narrativeClaimKind":null},{"id":"DFT_0022_1415-Q4","year":2026,"name":"LOWER THAMES CROSSING","department":"DFT","category":"Infrastructure and Construction","description":"The Lower Thames Crossing (LTC) is a proposed new road connecting Kent, Thurrock and Essex through twin-bored tunnels under the River Thames. It will almost double the road capacity across the River Thames east of London and is the largest single road investment project in the UK since the M25 was completed more than 30 years ago. As a vital part of the UK’s transport infrastructure, it will act as a catalyst for national and local economic growth. Building a reliable, modern new road that is fit for the future will help connect the nation's busiest ports to the distribution hubs in the North, Midlands and beyond. It will improve network resilience and the performance of the existing crossings at Dartford, transforming the regional and national road network. The LTC will open up new markets for businesses and create tens of thousands of new jobs and hundreds of apprenticeships during its construction. At Autumn Budget 2025 it was confirmed that the Government's preferred financing option at this stage of the project is the Regulated Asset Base (RAB) model which will allow for a regulated private entity to finance, build, operate, and maintain the asset under long-term oversight by an independent regulator. Under the RAB model, operations of the Dartford Crossing would transfer to a new regulated private sector entity, which would be responsible for operating and maintaining both the Dartford Crossing and the new LTC. The project therefore now incorporates the work required to create the legislative, regulatory and commercial framework for the RAB model.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 improved from Amber to Green. This is primarily due to the following factors‚ The LTC project secured additional public funding with £1.66bn in the Third Road Investment Strategy for the years 2026/27 and 2028/29 which includes the £891m announced at Autumn Budget 2025 and funding previously committed for those years. The Government also confirmed in 25/26 that the preferred finance model at this stage of the project is the Regulated Asset Base (RAB) model. This strengthens confidence in delivery and steps are being taken to prepare for a transaction with the private sector. The NISTA DCA rating for 25/26 Q4 is Amber, whilst we recognise that there are still risks to delivery, the SRO is content that sufficient mitigations were in place as of March-26 and therefore rated the DCA as Green. The project DCA is reviewed monthly. The Outline Business Case was updated and approved by the DfT Investment Committee in October 2025. This marks the transition from full public sector funding to a future private sector RAB model, with the private sector to deliver the remainder of the scheme and take on Dartford Crossing operations in 2028. The DfT team working on the project has expanded to reflect the new work required on legislation and regulation, and the SRO role during 25/26 moved from National Highways to DfT to reflect this broader scope.","startDate":"2014-05-30","endDate":"2035-07-31","scheduleNarrative":"The project was granted Development Consent on 25 March 2025. The project was re-baselined in October 2025 to inform Autumn Budget 2025 decision making where the Regulated Asset Base (RAB) model was selected as the preferred financing model. An Accounting Officer Assessment was undertaken to support this decision. The project remains on course to deliver as set out at Autumn Budget. We expect the existing Dartford Crossing and LTC project to move from public to private ownership in 2028. The main tunnelling phase for the LTC is expected to begin in 2028 and the target date for the road to be open for traffic is the early to mid-2030’s .","fyBaseline":338.05,"fyForecast":338.05,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":9899.54,"costNarrative":"Compared to financial year 24/25-Q4, the projects departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) increased from £8950,220m to £10629,020m. This is primarily due to schedule delay, the first delay was due to affordability and planning consent delays as set out in the Written Ministerial Statement issued 9 March 2023 which re-phased construction by 2 Years. A further delay to the DCO decision was announced by the Secretary of State in October 2024 extended the decision deadline to May 2025. The cost increase incorporates the prolongation and inflationary impacts following these two schedule delays which required the project to re-baseline. It should be noted that it is the intention to split the Whole Life Cost between both Public and Private finance under the Regulated Asset Base model. The transition to private finance is currently expected to occur in 2028. To note: the figures in the Annual Assessment may differ to those in this narrative due to NISTA deflating costs forecast for later years.","benefits":1816.27,"benefitsNarrative":"The current approved benefits at 25/26-Q4 remained at £3,009m. This figure is based on the project being fully publicly funded and is now outdated due to the approval to move to a Regulated Asset Base (RAB) model. The VfM analysis will continue to develop as detail on policy assumptions evolves, alongside any updates to our appraisal approach. For example, the department has made the decision to take forward LTC on the basis of the Regulated Asset Base model (RAB) and has published its intention to adopt new, higher values of time for freight movements. The strategic case for the LTC project remains strong. As well as the connectivity and congestion relieving benefits delivered by the new crossing, which leads to major economic benefits, this is also based around the escalating need for maintenance of the Dartford Crossing. The Dartford Crossing is already operating significantly over capacity and suffers from poor reliability. As with any major project, there are significant risks to be managed in order to realise the project’s benefits. We will continue to work with NISTA and apply lessons from the James Stewart review of High Speed 2 to help minimise those risks. Further work will be completed in the next stages of the programme up to FBC at which point the accounting officer assessment will be refreshed. As the benefits are expected to be felt for several decades, the figures in the Annual Assessment may differ to those in this narrative due to NISTA deflating benefits post 2050.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 improved from Amber to Green. This is primarily due to the following factors‚ The LTC project secured additional public funding with £1.66bn in the Third Road Investment Strategy for the years 2026/27 and 2028/29 which includes the £891m announced at Autumn…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project was granted Development Consent on 25 March 2025. The project was re-baselined in October 2025 to inform Autumn Budget 2025 decision making where the Regulated Asset Base (RAB) model was selected as the preferred financing model. An Accounting Officer Assessment was undertaken to support this decision. The project remains on course to deliver as set out at Autumn Budget. We expect the existing Dartford Crossing and LTC project to move from public to private ownership in 2028. The main tunnelling phase for the LTC is expected to begin in 2028 and the target date for the road to be open for traffic is the early to mid-2030’s .","narrativeClaimKind":null}],"previous":{"id":"DFT_0022_1415-Q4","year":2025,"name":"LOWER THAMES CROSSING","department":"DfT","category":"Infrastructure and Construction","description":"The Lower Thames Crossing (LTC) is a proposed new expressway connecting Kent, Thurrock and Essex through twin-bored tunnels under the Thames. It will almost double the road capacity across the River Thames east of London and is the largest single road investment project in the UK since the M25 was completed more than 30 years ago. As a vital part of the UKs transport infrastructure, it will act as a catalyst for national and local economic growth. Building a reliable, modern new road that is fit for the future will help connect the nation's busiest ports to the distribution hubs in the North, Midlands and beyond. It will improve network resilience and the performance of the existing crossings at Dartford, transforming the regional and national road network. LTC will open up new markets for businesses and create tens of thousands of new jobs and hundreds of apprenticeships during its construction.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The DCO decision date was the subject of a Written Ministerial Statement and was extended from the 4 October 2024 until 23 May 2025, with consent granted on 25 March 2025. The key strategic risks remain mainly on the complexity of the activity needed to take the Project through to future funding decisions.","startDate":"2014-05-30","endDate":"2034-04-20","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 20/04/2034. This is primarily due to the following factors‚ The project was subject to a Written Ministerial Statement on the 9 March 2023 re-phasing construction by 2 Years. The programme was re-baselined to reflect the March 2023 Written Ministerial Statement. This had a direct impact on the Open for Traffic date. This baseline is no longer viable after a second Written Ministerial Statement was issued on the 4 October 2024 extending the Development Consent Order Decision date until 23 May 2025 in order to allow more time for the application to be considered further, including as part of the spending review [Development Consent Order Consent granted 25 March 2025]. The project is currently working on the impact to the Open for Traffic following the second Written Ministerial Statement.","fyBaseline":203.0,"fyForecast":203.0,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":8950.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 8950. This is primarily due to the following factors‚ The project's departmentally agreed Whole Life Cost at 24/25-Q4 is 8950m. The project is currently forecasting within the approved budget. The spending review 2025 and the formal decision on the preferred funding option could impact the whole life costs of the project.","benefits":3009.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 3009. This is primarily due to the following factors‚ The departmentally agreed Benefits at 24/25-Q4 remained at 3009m. Formal decision on the preferred funding option could impact the benefits.","themes":["Cost & funding","Approvals & decisions","Governance & assurance","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The DCO decision date was the subject of a Written Ministerial Statement and was extended from the 4 October 2024 until 23 May 2025, with consent granted on 25 March…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 20/04/2034. This is primarily due to the following factors‚ The project was subject to a Written Ministerial Statement on the 9 March 2023 re-phasing construction by 2 Years. The programme was re-baselined to reflect the March 2023 Written Ministerial Statement. This had a direct impact on the Open for Traffic date. This baseline is no longer viable after a second Written Ministerial Statement was issued on the 4 October 2024 extending the Development Consent Order Decision date until 23 May 2025 in order to allow more time for the application to be considered further, including as part of the spending review [Development Consent Order Consent granted 25 March 2025]. The project is currently working on the impact to the Open for Traffic following the second Written Ministerial Statement.","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":467,"attentionScore":38,"attentionReasons":["Current published delivery confidence is Amber","Published end date moved 467 days later"]},{"id":"CO_0438_2425-Q3","year":2026,"name":"Manchester Digital Campus","department":"CO","category":"Infrastructure and Construction","description":"Manchester Digital Campus (MDC) will deliver two large office buildings on a brown field site in Central Manchester for 8800 FTE; it will collocate digitally focused departments in a central location as a Government Hub. MDC is a transformative programme that will create a Civil Service community centred on digital skills and the growth potential of the sector in the North West economy. MDC will foster greater cross-government collaboration and enable role relations into Manchester through Places for Growth.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Exempt under Section 24 - National security","startDate":"2025-04-07","endDate":"2032-12-17","scheduleNarrative":"Exempt under Section 24 - National security","fyBaseline":33.42,"fyForecast":33.42,"fyVariance":0.0,"varianceNarrative":"Since the last report, the OBC has been endorsed (Mar 26). The OBC has the baseline benefits for the Programme which to ensure standardisation of publishing are now discounted (£3,051.896M). This accounts for the variation between previous reports (which weren't discounted). The OBC cost shows a small reduction. This is due to a new cost plan at the end of RIBA3 and the result of a value engineering exercise.","wholeLifeCost":1029.78,"costNarrative":"Exempt under Section 24 - National security","benefits":2009.35,"benefitsNarrative":"Exempt under Section 24 - National security","themes":["Cost & funding","Technical & integration"],"evidenceExcerpt":"Exempt under Section 24 - National security Exempt under Section 24 - National security","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 24 - National security","narrativeClaimKind":null,"history":[{"id":"CO_0438_2425-Q3","year":2025,"name":"Manchester Digital Campus","department":"CO","category":"Government Transformation and Service Delivery","description":"Section 24 - National security","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Section 24 - National security","startDate":"2025-04-05","endDate":"2030-12-27","scheduleNarrative":"The project's end-date at 24/25-Q4 is scheduled to be 27/12/2030. This is primarily due to the following factors‚ Project delivery remains Dec 30.","fyBaseline":0.0,"fyForecast":0.0,"fyVariance":null,"varianceNarrative":"The budget variance is less than or equal to 5%. Agreed","wholeLifeCost":1443.7,"costNarrative":"Section 24 - National security","benefits":null,"benefitsNarrative":"Section 24 - National security","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Section 24 - National security The project's end-date at 24/25-Q4 is scheduled to be 27/12/2030. This is primarily due to the following factors‚ Project delivery remains Dec 30.","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 24/25-Q4 is scheduled to be 27/12/2030. This is primarily due to the following factors‚ Project delivery remains Dec 30.","narrativeClaimKind":null},{"id":"CO_0438_2425-Q3","year":2026,"name":"Manchester Digital Campus","department":"CO","category":"Infrastructure and Construction","description":"Manchester Digital Campus (MDC) will deliver two large office buildings on a brown field site in Central Manchester for 8800 FTE; it will collocate digitally focused departments in a central location as a Government Hub. MDC is a transformative programme that will create a Civil Service community centred on digital skills and the growth potential of the sector in the North West economy. MDC will foster greater cross-government collaboration and enable role relations into Manchester through Places for Growth.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Exempt under Section 24 - National security","startDate":"2025-04-07","endDate":"2032-12-17","scheduleNarrative":"Exempt under Section 24 - National security","fyBaseline":33.42,"fyForecast":33.42,"fyVariance":0.0,"varianceNarrative":"Since the last report, the OBC has been endorsed (Mar 26). The OBC has the baseline benefits for the Programme which to ensure standardisation of publishing are now discounted (£3,051.896M). This accounts for the variation between previous reports (which weren't discounted). The OBC cost shows a small reduction. This is due to a new cost plan at the end of RIBA3 and the result of a value engineering exercise.","wholeLifeCost":1029.78,"costNarrative":"Exempt under Section 24 - National security","benefits":2009.35,"benefitsNarrative":"Exempt under Section 24 - National security","themes":["Cost & funding","Technical & integration"],"evidenceExcerpt":"Exempt under Section 24 - National security Exempt under Section 24 - National security","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 24 - National security","narrativeClaimKind":null}],"previous":{"id":"CO_0438_2425-Q3","year":2025,"name":"Manchester Digital Campus","department":"CO","category":"Government Transformation and Service Delivery","description":"Section 24 - National security","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Section 24 - National security","startDate":"2025-04-05","endDate":"2030-12-27","scheduleNarrative":"The project's end-date at 24/25-Q4 is scheduled to be 27/12/2030. This is primarily due to the following factors‚ Project delivery remains Dec 30.","fyBaseline":0.0,"fyForecast":0.0,"fyVariance":null,"varianceNarrative":"The budget variance is less than or equal to 5%. Agreed","wholeLifeCost":1443.7,"costNarrative":"Section 24 - National security","benefits":null,"benefitsNarrative":"Section 24 - National security","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Section 24 - National security The project's end-date at 24/25-Q4 is scheduled to be 27/12/2030. This is primarily due to the following factors‚ Project delivery remains Dec 30.","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 24/25-Q4 is scheduled to be 27/12/2030. This is primarily due to the following factors‚ Project delivery remains Dec 30.","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":721,"attentionScore":38,"attentionReasons":["Current published delivery confidence is Amber","Published end date moved 721 days later"]},{"id":"MOJ_0064_2122-Q3","year":2026,"name":"Prisoner Education Services","department":"MOJ","category":"Government Transformation and Service Delivery","description":"The programme has three main objectives: 1. Improve the numeracy and literacy of all prisoners who need it 2. Incentivise prisoners to improve their qualifications and skills to increase prospects of finding work/integrating back into society 3. Ensure Governors and their teams have the knowledge, tools and support they need to lead this work.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25-Q4, the Delivery Confidence Assessment has remained Amber. This is primarily due to uncertainty regarding limited contingency for the project’s final procurement activity.","startDate":"2021-04-01","endDate":"2027-01-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project’s end date at 25/26-Q4 has changed from 31/12/25 to 31/01/27. This is primarily due to delays in the procurement of one element of the core education contract.","fyBaseline":190.73,"fyForecast":183.39,"fyVariance":3.85,"varianceNarrative":"The budget variance is less or equal to 5%.","wholeLifeCost":1755.13,"costNarrative":"Compared to financial year 24/25-Q4, the Whole Life Costs at 25/26-Q4 have decreased from £1,870.80m to £1755.13m. The budget remains aligned to the current baseline business case. All costs have been reported in 2024/25 base prices in line with NISTA requirements. This is a change from previous years where costs were reported in nominal prices. All costs reflect this accounting reduction regardless of any actual changes.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 remained at 0. This programme currently reports no monetised benefits. The programme's benefits are related to the successful onward operation of the Prisoner Education Service.","themes":["Cost & funding","Commercial & supply chain","Approvals & decisions","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 24/25-Q4, the Delivery Confidence Assessment has remained Amber. This is primarily due to uncertainty regarding limited contingency for the project’s final procurement activity. Compared to financial year 24/25-Q4, the project’s end date at 25/26-Q4 has changed from 31/12/25 to 31/01/27. This is primarily due to delays in the…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project’s end date at 25/26-Q4 has changed from 31/12/25 to 31/01/27. This is primarily due to delays in the procurement of one element of the core education contract.","narrativeClaimKind":null,"history":[{"id":"MOJ_0064_2122-Q3","year":2023,"name":"Prisoner Education Services","department":"MOJ","category":"Government Transformation and Service Delivery","description":"The Prisoner Education Service is part of the Reducing Reoffending Portfolio within His Majesty's Prison and Probation Service. The programme has three main objectives: 1. Improve the numeracy and literacy of all prisoners who need it 2. Incentivise prisoners to improve their qualifications and skills to increase prospects of finding work/integrating back into society 3. Ensure Governors and their teams have the knowledge, tools and support they need to lead this work.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 is Amber. This is primarily due to the following factors. This is thefirst timedata has been published for this project, which has been added to GMPP over the last year.The Amber assessment is driven by inflation risks.","startDate":"2021-04-01","endDate":"2025-06-30","scheduleNarrative":"The project's end-date at 22/23-Q4 is 2025-06-30. This is primarily due to the following factors. The programme is on track to deliver against the baseline schedule.","fyBaseline":3.5,"fyForecast":3.5,"fyVariance":0.0,"varianceNarrative":"Variance is less than 5%, so no narrative required","wholeLifeCost":1884.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 22/23-Q4 is 1884m. This is primarily due to the following factors. The Whole life costs are based on the most recent business case and include optimism bias.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This project currently reports no monetised benefits. The project's benefits are related to the successful onward operation of the Prison Education service.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 is Amber. This is primarily due to the following factors. This is thefirst timedata has been published for this project, which has been added to GMPP over the last year.The Amber assessment is driven by inflation risks. The project's end-date at 22/23-Q4 is 2025-06-30.…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 22/23-Q4 is 2025-06-30. This is primarily due to the following factors. The programme is on track to deliver against the baseline schedule.","narrativeClaimKind":null},{"id":"MOJ_0064_2122-Q3","year":2024,"name":"Prisoner Education Services","department":"MOJ","category":"Government Transformation and Service Delivery","description":"The Prisoner Education Service is part of the Rehabilitation Directorate within His Majesty's Prison and Probation Service. The programme has three main objectives: 1. Improve the numeracy and literacy of all prisoners who need it 2. Incentivise prisoners to improve their qualifications and skills to increase prospects of finding work/integrating back into society 3. Ensure Governors and their teams have the knowledge, tools and support they need to lead this work.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 22/23-Q4, the Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber(SRO rating). This is primarily due to the following factors. Inflation risks contributing to increasing estimated cost of delivery, offset by a reduction in delivery.","startDate":"2021-04-01","endDate":"2025-06-30","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2025-06-30. This is primarily due to the following factors. The project is on track to deliver against the baseline schedule.","fyBaseline":190.6,"fyForecast":190.6,"fyVariance":0.0,"varianceNarrative":"The budget variance is inferior or equal to 5%.","wholeLifeCost":1581.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 decreased from 1884m. to 1581m. This is primarily due to the following factors. The decrease reflects the updated Outline Business Case costs.","benefits":0.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 0m. This project currently reports no monetised benefits. The project's benefits are related to the successful onward operation of the Prisoner Education Service.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber(SRO rating). This is primarily due to the following factors. Inflation risks contributing to increasing estimated cost of delivery, offset by a reduction in delivery. Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2025-06-30. This is primarily due to the following factors. The project is on track to deliver against the baseline schedule.","narrativeClaimKind":null},{"id":"MOJ_0064_2122-Q3","year":2025,"name":"Prisoner Education Services","department":"MoJ","category":"Government Transformation and Service Delivery","description":"The Prisoner Education Service is part of the Rehabilitation Directorate within His Majesty's Prison and Probation Service. The programme has three main objectives: 1. Improve the numeracy and literacy of all prisoners who need it 2. Incentivise prisoners to improve their qualifications and skills to increase prospects of finding work/integrating back into society 3. Ensure Governors and their teams have the knowledge, tools and support they need to lead this work.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Tranche 1 delivery is complete, and Tranche 2 has inherent risks to its timeline.","startDate":"2021-04-01","endDate":"2025-12-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 30/06/2025 to 31/12/2025. This is primarily due to the following factors‚ The schedule was re-baselined to allow for finalisation of the new Core Education contracts and to increase the mobilisation duration.","fyBaseline":213.2,"fyForecast":200.17,"fyVariance":6.11,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The underspend is due to delays in digital mobilisation implementation requiring some costs to be re-profiled into future financial years and reduced Prison Education Framework contract costs.","wholeLifeCost":1870.8,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 1581 to 1870. This is primarily due to the following factors‚ The increase reflects the updated Full Business Case costs and include the cost of extending the existing Prisoner Education Framework contracts as per the Strategic Outline Business Case.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ This programme currently reports no monetised benefits. The programme's benefits are related to the successful onward operation of the Prisoner Education Service.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Tranche 1 delivery is complete, and Tranche 2 has inherent risks to its timeline. Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 30/06/2025 to 31/12/2025. This is primarily due to the following factors‚ The schedule was re-baselined to allow for finalisation of the new Core Education contracts and to increase the mobilisation duration.","narrativeClaimKind":null},{"id":"MOJ_0064_2122-Q3","year":2026,"name":"Prisoner Education Services","department":"MOJ","category":"Government Transformation and Service Delivery","description":"The programme has three main objectives: 1. Improve the numeracy and literacy of all prisoners who need it 2. Incentivise prisoners to improve their qualifications and skills to increase prospects of finding work/integrating back into society 3. Ensure Governors and their teams have the knowledge, tools and support they need to lead this work.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25-Q4, the Delivery Confidence Assessment has remained Amber. This is primarily due to uncertainty regarding limited contingency for the project’s final procurement activity.","startDate":"2021-04-01","endDate":"2027-01-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project’s end date at 25/26-Q4 has changed from 31/12/25 to 31/01/27. This is primarily due to delays in the procurement of one element of the core education contract.","fyBaseline":190.73,"fyForecast":183.39,"fyVariance":3.85,"varianceNarrative":"The budget variance is less or equal to 5%.","wholeLifeCost":1755.13,"costNarrative":"Compared to financial year 24/25-Q4, the Whole Life Costs at 25/26-Q4 have decreased from £1,870.80m to £1755.13m. The budget remains aligned to the current baseline business case. All costs have been reported in 2024/25 base prices in line with NISTA requirements. This is a change from previous years where costs were reported in nominal prices. All costs reflect this accounting reduction regardless of any actual changes.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 remained at 0. This programme currently reports no monetised benefits. The programme's benefits are related to the successful onward operation of the Prisoner Education Service.","themes":["Cost & funding","Commercial & supply chain","Approvals & decisions","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 24/25-Q4, the Delivery Confidence Assessment has remained Amber. This is primarily due to uncertainty regarding limited contingency for the project’s final procurement activity. Compared to financial year 24/25-Q4, the project’s end date at 25/26-Q4 has changed from 31/12/25 to 31/01/27. This is primarily due to delays in the…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project’s end date at 25/26-Q4 has changed from 31/12/25 to 31/01/27. This is primarily due to delays in the procurement of one element of the core education contract.","narrativeClaimKind":null}],"previous":{"id":"MOJ_0064_2122-Q3","year":2025,"name":"Prisoner Education Services","department":"MoJ","category":"Government Transformation and Service Delivery","description":"The Prisoner Education Service is part of the Rehabilitation Directorate within His Majesty's Prison and Probation Service. The programme has three main objectives: 1. Improve the numeracy and literacy of all prisoners who need it 2. Incentivise prisoners to improve their qualifications and skills to increase prospects of finding work/integrating back into society 3. Ensure Governors and their teams have the knowledge, tools and support they need to lead this work.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Tranche 1 delivery is complete, and Tranche 2 has inherent risks to its timeline.","startDate":"2021-04-01","endDate":"2025-12-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 30/06/2025 to 31/12/2025. This is primarily due to the following factors‚ The schedule was re-baselined to allow for finalisation of the new Core Education contracts and to increase the mobilisation duration.","fyBaseline":213.2,"fyForecast":200.17,"fyVariance":6.11,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The underspend is due to delays in digital mobilisation implementation requiring some costs to be re-profiled into future financial years and reduced Prison Education Framework contract costs.","wholeLifeCost":1870.8,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 1581 to 1870. This is primarily due to the following factors‚ The increase reflects the updated Full Business Case costs and include the cost of extending the existing Prisoner Education Framework contracts as per the Strategic Outline Business Case.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ This programme currently reports no monetised benefits. The programme's benefits are related to the successful onward operation of the Prisoner Education Service.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Tranche 1 delivery is complete, and Tranche 2 has inherent risks to its timeline. Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 30/06/2025 to 31/12/2025. This is primarily due to the following factors‚ The schedule was re-baselined to allow for finalisation of the new Core Education contracts and to increase the mobilisation duration.","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":396,"attentionScore":38,"attentionReasons":["Current published delivery confidence is Amber","Published end date moved 396 days later"]},{"id":"DWP_0013_2122-Q2","year":2026,"name":"Workplace Transformation","department":"DWP","category":"Government Transformation and Service Delivery","description":"The Workplace Transformation Programme (WTP) is a 10-year programme to support the change to the Department’s operating model, consolidate the estate to the right size and shape and provide more flexible, efficient and better quality sustainable buildings in alignment with the Government’s greening commitments, Places for Growth, and building back better. Throughout the transformation, WTP remains committed to proactively supporting colleagues and customers through this period of change. WTP is working with other Programmes to modernise the services underpinning the DWP ambition of becoming a simpler, cheaper, and more efficient organisation, enabling our people to deliver quality outcomes; reflecting citizens’ and the Modern Civil Service’s needs: enhancing lives; enabling success; and ensuring value. WTP will deliver far more than a smaller, better and greener estate. It will fundamentally reshape our support to customers, how we work, where we work and when we work, helping to make DWP a great place to work. WTP works closely with colleagues delivering the new jobs and careers service, who are setting out the future operating model to transform the Department’s customer facing presence and better support communities. In our Service and Support Centre estate, where colleagues do not see customers face-to-face, the Department is rightsizing the estate to ensure efficiency by only paying for the space we need. This will lead to fewer, larger, multi-product line buildings, investment in some sites we retain to improve the working environment, and, where it is the most cost-effective solution, acquiring new sites. It will also change the way people work through investing in new ways of working, changing the way staff use buildings by more flexible ways of working and to deliver on the Department’s obligations to fully embed Smarter Working and PAS 3000 standards and supporting the shift towards the delivery of digital services. WTP requires significant capital investment but delivers huge financial and social benefits each following year by consolidating and improving our workplace with a direct positive impact on customer experience and outcomes.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The NISTA review carried out during January 2026 assessed the Programme as Amber indicating that WTP is in a good position to deliver further success. It noted that the Programme is well led and has strong inter-personal relationships with key stakeholders. The SRO has agreed the recommendations detailed in the report and an action plan has been developed. Regular updates will be provided to the boards on progress to address the recommendations. The rating recognises the transformation journey the department is on – with a dependency on other transformation programmes and the department’s evolving departmental operating model in terms of understanding the size of the estate, particularly beyond 2030. This includes a dependency on the DWP Target Operating Model (TOM).","startDate":"2020-07-01","endDate":"2031-03-31","scheduleNarrative":"WTP is complex, and as an enabling Programme it has a number of key dependencies including future size of the workforce, how that workforce is deployed, and the underpinning ways services are delivered (the operating model) during modernisation/transformation. The third iteration of the Programme Business Case (PBC) was approved by HMT in June 2025 with a fourth iteration of the Programme Business Case (PBC4) was approved on the 23/03/26 securing approval for a \"Balanced Approach\" to rationalise the estate into a smaller, more efficient, and sustainable footprint starting from FY2026/27. Deliverables achieved within 25-26 include: · Closure of selected Jobcentres and Service and Support Centres · Decommissioned temporary jobcentres established to support customers during the pandemic. Only one temporary jobcentre remains open to the public and this will be converted to a permanent jobcentre. · Completed investment work in Jobcentre and Service and Support Centre sites to improve the standard of buildings. · Progression of high-profile office moves in London · Moved colleagues into ‘award winning’ Fylde View building in Blackpool, contributing to wider local authority plans to regenerate the town centre. · Started construction of new Newcastle hub - due for completion in 2027. · Installation of 255 electric car charging points at over 100 DWP sites saving over 199.76 tonnes of CO2 to date. · Repaired or installed cycle racks at 94 sites. · Installation of Under Setting Sensors to improve our understanding of space utilisation within sites. · Feasibility work to inform future investment and divestment of sites · Launched a lift share app at five pilot sites, reducing travel costs and carbon impacts by facilitating shared commutes to the office. · Led on the implementation of 60% In Office Attendance across the Department.","fyBaseline":532.06,"fyForecast":520.95,"fyVariance":2.09,"varianceNarrative":"The budget variance is less than 5%.","wholeLifeCost":3367.17,"costNarrative":"Compared to financial year 24/25-Q4, the programme’s departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) at £3367.17m. This increase is primarily due to the following factors: The transition from Programme Business Case (PBC2) to the departmentally approved Programme Business case (PBC4). PBC2 focused on Spending Review (SR21) delivery, largely targeting specific projects. PBC4 incorporates more detailed delivery planning for SR25 onwards. Key drivers include: • Revised assumptions following detailed delivery planning for SR25 including changes in the strategy for the number of sites. Previous PBC2 assumptions were based on SR21 hence less refined for future years. • More complex and higher cost projects compared to earlier network design activity. • Updated people impact costs reflecting lease end positions, alternative options, and ministerial decisions. • Updated cost modelling assumptions aligned to current industry benchmarks and construction inflation. • In PBC4 we have reclassified the IFRS 16 (International Financial Reporting Standards) impacts which are no longer part of the financial case cash position based on NISTA (National Infrastructure and Service Transformation Authority) advice","benefits":3938.0,"benefitsNarrative":"Compared to financial year 24/25-Q4, the programme’s departmentally agreed Whole Life Benefits at 25/26-Q4 (measured in £m) decreased to £3938m. This decrease is primarily due to the following factors: • The transition from Programme Business Case (PBC2) to the departmentally approved Programme Business Case (PBC4). PBC2 focused on Spending Review (SR21) delivery, largely targeting specific projects. PBC4 incorporates more detailed delivery planning for SR25 onwards. • Updated assumptions and delivery timelines led to revisions in projected benefits, aligned to the latest cost and phasing data. • In PBC4 we have reclassified the IFRS 16 (International Financial Reporting Standards) impacts which are no longer part of the financial case cash position based on NISTA (National Infrastructure and Service Transformation Authority) advice.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"The NISTA review carried out during January 2026 assessed the Programme as Amber indicating that WTP is in a good position to deliver further success. It noted that the Programme is well led and has strong inter-personal relationships with key stakeholders. The SRO has agreed the recommendations detailed in the report and an action plan has been developed.…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"WTP is complex, and as an enabling Programme it has a number of key dependencies including future size of the workforce, how that workforce is deployed, and the underpinning ways services are delivered (the operating model) during modernisation/transformation. The third iteration of the Programme Business Case (PBC) was approved by HMT in June 2025 with a fourth iteration of the Programme Business Case (PBC4) was approved on the 23/03/26 securing approval for a \"Balanced Approach\" to rationalise the estate into a smaller, more efficient, and sustainable footprint starting from FY2026/27. Deliverables achieved within 25-26 include: · Closure of selected Jobcentres and Service and Support Centres · Decommissioned temporary jobcentres established to support customers during the pandemic. Only one temporary jobcentre remains open to the public and this will be converted to a permanent jobcentre. · Completed investment work in Jobcentre and Service and Support Centre sites to improve the standard of buildings. · Progression of high-profile office moves in London · Moved colleagues into ‘award winning’ Fylde View building in Blackpool, contributing to wider local authority plans to regenerate the town centre. · Started construction of new Newcastle hub - due for completion in 2027. · Installation of 255 electric car charging points at over 100 DWP sites saving over 199.76 tonnes of CO2 to date. · Repaired or installed cycle racks at 94 sites. · Installation of Under Setting Sensors to improve our understanding of space utilisation within sites. · Feasibility work to inform future investment and divestment of sites · Launched a lift share app at five pilot sites, reducing travel costs and carbon impacts by facilitating shared commutes to the office. · Led on the implementation of 60% In Office Attendance across the Department.","narrativeClaimKind":null,"history":[{"id":"DWP_0013_2122-Q2","year":2022,"name":"Workplace Transformation","department":"DWP","category":"Government Transformation and Service Delivery","description":"Workplace Transformation is a 10-year programme which supports the change to the Department's operating model and consolidation of its estate portfolio into the right size and shape. It will provide flexible, efficient, better quality and sustainable buildings, in alignment with the Government's Greening commitments, Places for Growth, levelling up the economy and building back better. Delivering far more than estates modernisation, it requires significant capital investment over the early years but delivers financial and social benefits each following year, fundamentally reshaping our support to customers. Workplace Transformation will deliver the Department's obligations to fully embed Smarter Working and achieve PAS3000 standard by December 2022. This will also support changes in how, where and when we work, investing in new more flexible ways of working, changing the way staff use buildings and continuing to support the shift towards the delivery of digital services, helping to make DWP a great place to work.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 is Amber. This is primarily due to the following factors: We are in year one of a ten year programme. The Programme Business Case was approved at the end of March 2022 and detailed planning is now in progress with key stakeholders and partners to fully impact any risks to the high level delivery plan dates.","startDate":"2020-07-01","endDate":"2030-03-31","scheduleNarrative":"Your project end-date is 31 MAR 2030. This is primarily due to the following factors: The Programme is currently being delivered over two phases. Phase one is in delivery and governed with funding allocated until 24/25. Phase two design is currently under development and will progress via established governance processes to confirm and agree funding allocations as part of the next Spending Review.","fyBaseline":8.4,"fyForecast":10.93,"fyVariance":30.0,"varianceNarrative":"The 21/22 baseline is based on the Programme Business Case. The 21/22 forecasts reflects a departmental authorised spend in 2021 in line with the aims and objectives of the Programme Business Case which included improvements to floorplate design and Microsoft Teams enabled meeting rooms .","wholeLifeCost":862.0,"costNarrative":"Your projects Baseline Whole Life Cost is 862.30 (£m). This is primarily due to the following factors: The department will use lease break opportunities in 2023 and 2028 to transform and right-size the estate, with targeted investment based on length of building tenure, making the overall estate smaller. Those sites we intend to exit in 2028, will be subject to an absolute minimum spend, driven by the results of individual Building Assessment Reports. Sites with a longer term strategic future, retained beyond 2028 and capable of meeting greening government targets, will be upgraded to meet the standards of other modern DWP buildings.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 is Amber. This is primarily due to the following factors: We are in year one of a ten year programme. The Programme Business Case was approved at the end of March 2022 and detailed planning is now in progress with key stakeholders and partners to fully impact any risks…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Your project end-date is 31 MAR 2030. This is primarily due to the following factors: The Programme is currently being delivered over two phases. Phase one is in delivery and governed with funding allocated until 24/25. Phase two design is currently under development and will progress via established governance processes to confirm and agree funding allocations as part of the next Spending Review.","narrativeClaimKind":null},{"id":"DWP_0013_2122-Q2","year":2023,"name":"Workplace Transformation","department":"DWP","category":"Government Transformation and Service Delivery","description":"The Workplace Transformation Programme is a 10-year programme which focuses on how and where we will work, determining our future locations and working practices. This will deliver efficiencies and enable genuine modernisation and transformation within DWP. Alongside this there is a structured programme of essential works to ensure our ageing buildings remain safe and functional for claimants and colleagues delivered through our Estate function. Together they support the Government's Property Strategy to deliver a smaller, better, and greener estate and the Places for Growth objectives - making DWP a great place to work and improving the customer experience.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"","startDate":"2020-07-01","endDate":"2030-03-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2030-03-31. This is primarily due to the following factors. WPT is complex, as an enabling Programme it has a number of key dependencies including future size of the workforce, how that workforce is deployed, and the underpinning ways services are delivered (the operating model) during modernisation/transformation. However, the programme has a burning platform for future location strategy delivery due to lease events in 2028 which will need to drive decision-making for the next phase.PBCv2.0 for 23-24 funding is due for HMT approval in May 2023. PBCv3.0 timeline is in development. PBCv3.0 will seek funding for the remainder of this SR, 24-25 and across the next.To date, the Programme has achieved a majority of Deliverables while actively managing the few where delivery slipped due to external influences.Planned building closures, consolidations and refurbishments proceed to plan. The 'retain, re-train, re-deploy' strategy has resulted in lower people exit costs than forecasted.The phased approach for Temporary Jobcentres closure commenced as planned, the Programme taking advantage of where early lease-breaks present.","fyBaseline":250.6,"fyForecast":82.15,"fyVariance":-67.0,"varianceNarrative":"The baseline uses the Programme Business case (PBC) set in March 22 which aligned to the site level strategy at that point. This baseline is therefore over one year old. Since then, the site level strategy has been subject to change following feasibility stages and deep dives. The outturn for 22/23 was 168.5m below the original PBC baseline, this was due to a number of factors, including the impacts of IFRS16 accounting treatment, lower than anticipated number of people exits, absorption of training costs within existing allocations, building costs per square metre being lower than original estimates and pausing of activity on sites not demonstrating value for money. Additionally, to ensure successful delivery of benefits enabled by site closures, some improvement work has been reprofiled into the remaining years of the SR. Despite the lower outturn the realisation of benefits remains on track with no impact to successful delivery of the programme. To improve the cost management of the programme in future years we have undertaken additional scrutiny of the delivery plans and assumptions, as well as strengthening financial reporting processes.","wholeLifeCost":862.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 remained at 862m. This is primarily due to the following factors. The actual spend figure above, reflects the first delivery year 22-23 of WTP although the Baselined Whole Life Cost figure, reflects the latest approved Programme Business Case (v1), approved for 22-23. The revised Whole Life Cost figure will be updated alongside PBCv2, including the impacts of IFRS16 (lease accounting), which will be included in the Q1 GMPP report.","benefits":3536.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 3536m. By right-sizing, the estates baseline can be reduced by 80m-90m per year from 2028/29. Subject to future funding ultimately deliver substantial gross savings of 3,536m (inc. Vat and inflation, exclude depreciation) over a standard 30-year estate business case period.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2030-03-31. This is primarily due to the following factors. WPT is complex, as an enabling Programme it has a number of key dependencies including future size of the workforce, how that workforce is deployed, and the underpinning ways services are…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2030-03-31. This is primarily due to the following factors. WPT is complex, as an enabling Programme it has a number of key dependencies including future size of the workforce, how that workforce is deployed, and the underpinning ways services are delivered (the operating model) during modernisation/transformation. However, the programme has a burning platform for future location strategy delivery due to lease events in 2028 which will need to drive decision-making for the next phase.PBCv2.0 for 23-24 funding is due for HMT approval in May 2023. PBCv3.0 timeline is in development. PBCv3.0 will seek funding for the remainder of this SR, 24-25 and across the next.To date, the Programme has achieved a majority of Deliverables while actively managing the few where delivery slipped due to external influences.Planned building closures, consolidations and refurbishments proceed to plan. The 'retain, re-train, re-deploy' strategy has resulted in lower people exit costs than forecasted.The phased approach for Temporary Jobcentres closure commenced as planned, the Programme taking advantage of where early lease-breaks present.","narrativeClaimKind":null},{"id":"DWP_0013_2122-Q2","year":2024,"name":"Workplace Transformation","department":"DWP","category":"Government Transformation and Service Delivery","description":"The Workplace Transformation Programme (WTP) is a 10-year programme focusing on future locations and working practices. Investment will deliver flexible, affordable and inclusive workplaces through a smaller, better and greener estate, delivering efficiencies and enabling genuine modernisation and transformation within DWP. WTP sits alongside a schedule of essential works delivered through our Estates function ensuring our ageing buildings remain safe and functional for claimants and colleagues. This supports the Government's Property Strategy and Places for Growth objectives - making DWP a great place to work. WTP will also invest in our ways of working, changing the way our people use buildings and delivering on the Department's obligations to embed Smarter Working and PAS 3000 standards. WTP requires significant capital investment but delivers significant financial savings as well as wider social benefits each following year, consolidating and improving our workplace with a direct positive impact on customer experience and outcomes.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. The latest IPA RAG rating is Amber. All the recommendations from the last IPA review have been actioned and closure of these were approved by Programme Board. The rating recognises the transformation journey the department is on - with a dependency on other transformation programmes and the department's evolving departmental operating model in terms of understanding the size of the estate, particularly beyond 2030.These are out with the programme's control, although strong relationships have been built with those, including roles within our governance and a delivery plan has been developed to make sure progress in the shorter term can be made.","startDate":"2020-07-01","endDate":"2030-03-31","scheduleNarrative":"The project's end-date at 23/24-Q4 is 2030-03-31. This is primarily due to the following factors. WTP is a complex Programme with a number of key dependencies including future size and deployment of the workforce and the future operating model. WTP achieved the majority of planned deliverables to 'right size' and improve the quality of the estate in 23/24 actively managing the few where delivery slipped due to external influences. Deliverables achieved included: . closure of selected sites . site investment work to improve building standards . reduce redundant space based on occupancy levels . Feasibility work to inform future investment levels The People Strategy supporting WTP, to 'retain, retrain and redeploy' colleagues was successfully implemented, resulting in lower people exit costs than forecasted with no compulsory redundancies. Four Cabinet Office Places for Growth targets were met or exceeded ahead of 2025 deadlines, including relocating DWP roles from London. WTP are now developing its future plans aligned to the next Spending Review and scheduled lease expiry dates in 2028.","fyBaseline":172.83,"fyForecast":133.72,"fyVariance":-23.0,"varianceNarrative":"The budget variance exceeds 5%. The financial Year 2324 outturn reflects changes since the completion of Programme Business Case 2 (PBC2 May 23), resulting in c39m lower outturn than PBC2. This is mainly due to the impact of changes to latest site delivery plans following feasibility studies and a series of deep dive scrutiny sessions which have informed cost assumptions versus those used in PBC2. Some projects have been aborted whilst there are others that have been included in the latest outturn that were approved after the PBC2 was submitted. _x000D_ The outturn also reflects lower people costs associated with building consolidations and closures. Further variances relate to Programme resources, where recruitment plans were lower than original PBC2. _x000D_ Internal budget allocations were revised to c153m during 23/24 to reflect some of known changes described above. Further movement within the programme has resulted in an underspend against budget of c19m (Budget c153m v Outturn c134m - Var c19m).","wholeLifeCost":830.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 decreased from 862m. to 830m. This is primarily due to the following factors. 2223 Q4 whole life baseline was based on Programme Business Case (PBC1) signed off by HMT in March 22 with whole life baseline costs at 862.3m. This has since been revised at Q3 to reflect historic actual costs for FY21/22 and FY22/23 and the approved PBC2 for FY23/24 onwards. The revised whole life baseline costs are 829.79m, a decrease of 33m since PBC1. This is a net cost reduction due to changes in some assumptions from original PBC1.","benefits":2969.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 2969m.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Approvals & decisions"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. The latest IPA RAG rating is Amber. All the recommendations from the last IPA review have been actioned and closure of these were approved by Programme Board. The rating recognises the transformation journey the…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 23/24-Q4 is 2030-03-31. This is primarily due to the following factors. WTP is a complex Programme with a number of key dependencies including future size and deployment of the workforce and the future operating model. WTP achieved the majority of planned deliverables to 'right size' and improve the quality of the estate in 23/24 actively managing the few where delivery slipped due to external influences. Deliverables achieved included: . closure of selected sites . site investment work to improve building standards . reduce redundant space based on occupancy levels . Feasibility work to inform future investment levels The People Strategy supporting WTP, to 'retain, retrain and redeploy' colleagues was successfully implemented, resulting in lower people exit costs than forecasted with no compulsory redundancies. Four Cabinet Office Places for Growth targets were met or exceeded ahead of 2025 deadlines, including relocating DWP roles from London. WTP are now developing its future plans aligned to the next Spending Review and scheduled lease expiry dates in 2028.","narrativeClaimKind":null},{"id":"DWP_0013_2122-Q2","year":2025,"name":"Workplace Transformation","department":"DWP","category":"Government Transformation and Service Delivery","description":"The Workplace Transformation Programme (WTP) is a 10-year programme to support the change to the Department’s operating model, consolidate the estate to the right size and shape and provide more flexible, efficient and better-quality sustainable buildings in alignment with the Government’s greening commitments, Places for Growth, levelling up the economy and building back better. Throughout the transformation, WTP remains committed to proactively support colleagues and customers through this period of change. WTP is working with other Programmes to modernise the services underpinning the DWP ambition of becoming a simpler, cheaper, and more efficient organisation, enabling our people to deliver quality outcomes; reflecting citizens’ and the Modern Civil Service’s needs: enhancing lives; enabling success; and ensuring value. WTP will deliver far more than a smaller, better, and greener estate modernisation. It will fundamentally reshape our support to customers, how we work, where we work and when we work, helping to make DWP a great place to work. It will also change the way people work through investing in new ways of working, changing the way staff use buildings by more flexible ways of working and to deliver on the Department’s obligations to fully embed Smarter Working and PAS 3000 standards and supporting the shift towards the delivery of digital services. WTP requires significant capital investment but delivers significant financial and social benefits each delivery year by consolidating and improving our workplace with a direct positive impact on customer experience and outcomes throughout the programme’s lifecycle.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The IPA review carried out during September 2024, assessed the Programme as Amber indicating that while there are significant challenges, the Programme is feasible and achievable. The Programme has almost completed its action plan to address the recommendations made, with just one remaining action due to be concluded by the end of July 2025. The rating recognises the transformation journey the department is on – with a dependency on other transformation programmes and the department’s evolving departmental operating model in terms of understanding the size of the estate, particularly beyond 2030. These are out with the programme’s control, although strong relationships have been built with those programmes.","startDate":"2020-07-01","endDate":"2030-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2030. This is primarily due to the following factors‚ WTP is complex, and as an enabling Programme it has a number of key dependencies including future size of the workforce, how that workforce is deployed, and the underpinning ways services are delivered (the operating model) during modernisation/transformation. The second iteration of the Programme Business Case (PBC) was approved by HMT in October 2023 with a third iteration currently with HMT awaiting approval as per annual refresh and iteration processes. The programme has been developing plans for 2025 to 2028, aligning its modelling with its Spending Review bid and scheduled lease expiry events in 2028, across the DWP estate. The Programme achieved its planned deliverables to ‘right size’ and improve the quality of the estate in 24/25. Deliverables achieved included: • Closure of selected ‘Back of House’, Front of House and Temporary Jobcentre sites • Investment work in sites to improve the standard of buildings and increase and improve the provision of Learning Design and Development rooms • Progression of high-profile office moves in London, Blackpool, and Newcastle • Installation of electric car charging points • Provision of cycle storage • Installation of Under Setting Sensors to improve our understanding of space utilisation within sites • Feasibility work to inform future investment and divestment of sites The Programme has been leading on the implementation of 60% In Office Attendance across the Department. Progress has been made to enable this. A Business Change approach has been developed to embed working practices which enable and encourage our colleagues to use our buildings effectively, helping us to; maximise the utilisation of our sites, support the development of inclusive communities, cultures and connections in our offices and deliver return on our investment.","fyBaseline":196.17,"fyForecast":113.45,"fyVariance":42.17,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The HMT approved baseline/departmental baseline is based on PBC2 which was completed in May 2023. Since then, the outturn has been subject to changes and reflects the latest delivery plans. There are a number of reasons for the movement between PBC2 and the 24/25 outturn. Firstly, cost assumptions have been updated since PBC2 to reflect the outcome of feasibility studies, and a series of deep dive scrutiny sessions. Some projects have not progressed whilst there are other projects that have been approved after the PBC2 was submitted. Excess fares in PBC2 have been removed, partly due to reductions in eligibility / take up and the balance being absorbed by the business. Other outturn reductions relate to a lower Programme staff cost as recruitment has not progressed as originally forecast. Enabling functions costs have been revised, along with a reduction in expenditure for Workplace Management Solutions due to the firming up of the preferred option. These movements were offset by dilapidations costs being higher than anticipated due to movement from the previous year as a result of extended negotiations to secure the best value settlement.","wholeLifeCost":3506.7,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 830 to 3506. This is primarily due to the following factors‚ There has been a change to data presentation only. Previously the HMT Approved/Departmental baseline recurrent costs were netted off in the benefits tab, hence benefit tab reflected the net benefits position. For Q4 for presentational purposes only, gross HMT Approved/Departmental baseline recurrent costs of £2,676.9m have been removed from the benefits tab and input under the costs tab (under recurring new costs). The net effect of this movement is nil.","benefits":5645.6,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 2969 to 5645. This is primarily due to the following factors‚ There has been a change to data presentation. Previously the HMT Approved/Departmental baseline recurrent costs were netted off in the benefits tab, hence benefit tab reflected the net benefits position. For Q4 for presentational purposes only, gross HMT Approved/Departmental baseline costs of £2,676.9m have been removed from the benefits tab and input under the costs tab (under recurring new costs). The net effect of this movement is nil.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The IPA review carried out during September 2024, assessed the Programme as Amber indicating that while there are significant challenges, the Programme is feasible…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2030. This is primarily due to the following factors‚ WTP is complex, and as an enabling Programme it has a number of key dependencies including future size of the workforce, how that workforce is deployed, and the underpinning ways services are delivered (the operating model) during modernisation/transformation. The second iteration of the Programme Business Case (PBC) was approved by HMT in October 2023 with a third iteration currently with HMT awaiting approval as per annual refresh and iteration processes. The programme has been developing plans for 2025 to 2028, aligning its modelling with its Spending Review bid and scheduled lease expiry events in 2028, across the DWP estate. The Programme achieved its planned deliverables to ‘right size’ and improve the quality of the estate in 24/25. Deliverables achieved included: • Closure of selected ‘Back of House’, Front of House and Temporary Jobcentre sites • Investment work in sites to improve the standard of buildings and increase and improve the provision of Learning Design and Development rooms • Progression of high-profile office moves in London, Blackpool, and Newcastle • Installation of electric car charging points • Provision of cycle storage • Installation of Under Setting Sensors to improve our understanding of space utilisation within sites • Feasibility work to inform future investment and divestment of sites The Programme has been leading on the implementation of 60% In Office Attendance across the Department. Progress has been made to enable this. A Business Change approach has been developed to embed working practices which enable and encourage our colleagues to use our buildings effectively, helping us to; maximise the utilisation of our sites, support the development of inclusive communities, cultures and connections in our offices and deliver return on our investment.","narrativeClaimKind":null},{"id":"DWP_0013_2122-Q2","year":2026,"name":"Workplace Transformation","department":"DWP","category":"Government Transformation and Service Delivery","description":"The Workplace Transformation Programme (WTP) is a 10-year programme to support the change to the Department’s operating model, consolidate the estate to the right size and shape and provide more flexible, efficient and better quality sustainable buildings in alignment with the Government’s greening commitments, Places for Growth, and building back better. Throughout the transformation, WTP remains committed to proactively supporting colleagues and customers through this period of change. WTP is working with other Programmes to modernise the services underpinning the DWP ambition of becoming a simpler, cheaper, and more efficient organisation, enabling our people to deliver quality outcomes; reflecting citizens’ and the Modern Civil Service’s needs: enhancing lives; enabling success; and ensuring value. WTP will deliver far more than a smaller, better and greener estate. It will fundamentally reshape our support to customers, how we work, where we work and when we work, helping to make DWP a great place to work. WTP works closely with colleagues delivering the new jobs and careers service, who are setting out the future operating model to transform the Department’s customer facing presence and better support communities. In our Service and Support Centre estate, where colleagues do not see customers face-to-face, the Department is rightsizing the estate to ensure efficiency by only paying for the space we need. This will lead to fewer, larger, multi-product line buildings, investment in some sites we retain to improve the working environment, and, where it is the most cost-effective solution, acquiring new sites. It will also change the way people work through investing in new ways of working, changing the way staff use buildings by more flexible ways of working and to deliver on the Department’s obligations to fully embed Smarter Working and PAS 3000 standards and supporting the shift towards the delivery of digital services. WTP requires significant capital investment but delivers huge financial and social benefits each following year by consolidating and improving our workplace with a direct positive impact on customer experience and outcomes.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The NISTA review carried out during January 2026 assessed the Programme as Amber indicating that WTP is in a good position to deliver further success. It noted that the Programme is well led and has strong inter-personal relationships with key stakeholders. The SRO has agreed the recommendations detailed in the report and an action plan has been developed. Regular updates will be provided to the boards on progress to address the recommendations. The rating recognises the transformation journey the department is on – with a dependency on other transformation programmes and the department’s evolving departmental operating model in terms of understanding the size of the estate, particularly beyond 2030. This includes a dependency on the DWP Target Operating Model (TOM).","startDate":"2020-07-01","endDate":"2031-03-31","scheduleNarrative":"WTP is complex, and as an enabling Programme it has a number of key dependencies including future size of the workforce, how that workforce is deployed, and the underpinning ways services are delivered (the operating model) during modernisation/transformation. The third iteration of the Programme Business Case (PBC) was approved by HMT in June 2025 with a fourth iteration of the Programme Business Case (PBC4) was approved on the 23/03/26 securing approval for a \"Balanced Approach\" to rationalise the estate into a smaller, more efficient, and sustainable footprint starting from FY2026/27. Deliverables achieved within 25-26 include: · Closure of selected Jobcentres and Service and Support Centres · Decommissioned temporary jobcentres established to support customers during the pandemic. Only one temporary jobcentre remains open to the public and this will be converted to a permanent jobcentre. · Completed investment work in Jobcentre and Service and Support Centre sites to improve the standard of buildings. · Progression of high-profile office moves in London · Moved colleagues into ‘award winning’ Fylde View building in Blackpool, contributing to wider local authority plans to regenerate the town centre. · Started construction of new Newcastle hub - due for completion in 2027. · Installation of 255 electric car charging points at over 100 DWP sites saving over 199.76 tonnes of CO2 to date. · Repaired or installed cycle racks at 94 sites. · Installation of Under Setting Sensors to improve our understanding of space utilisation within sites. · Feasibility work to inform future investment and divestment of sites · Launched a lift share app at five pilot sites, reducing travel costs and carbon impacts by facilitating shared commutes to the office. · Led on the implementation of 60% In Office Attendance across the Department.","fyBaseline":532.06,"fyForecast":520.95,"fyVariance":2.09,"varianceNarrative":"The budget variance is less than 5%.","wholeLifeCost":3367.17,"costNarrative":"Compared to financial year 24/25-Q4, the programme’s departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) at £3367.17m. This increase is primarily due to the following factors: The transition from Programme Business Case (PBC2) to the departmentally approved Programme Business case (PBC4). PBC2 focused on Spending Review (SR21) delivery, largely targeting specific projects. PBC4 incorporates more detailed delivery planning for SR25 onwards. Key drivers include: • Revised assumptions following detailed delivery planning for SR25 including changes in the strategy for the number of sites. Previous PBC2 assumptions were based on SR21 hence less refined for future years. • More complex and higher cost projects compared to earlier network design activity. • Updated people impact costs reflecting lease end positions, alternative options, and ministerial decisions. • Updated cost modelling assumptions aligned to current industry benchmarks and construction inflation. • In PBC4 we have reclassified the IFRS 16 (International Financial Reporting Standards) impacts which are no longer part of the financial case cash position based on NISTA (National Infrastructure and Service Transformation Authority) advice","benefits":3938.0,"benefitsNarrative":"Compared to financial year 24/25-Q4, the programme’s departmentally agreed Whole Life Benefits at 25/26-Q4 (measured in £m) decreased to £3938m. This decrease is primarily due to the following factors: • The transition from Programme Business Case (PBC2) to the departmentally approved Programme Business Case (PBC4). PBC2 focused on Spending Review (SR21) delivery, largely targeting specific projects. PBC4 incorporates more detailed delivery planning for SR25 onwards. • Updated assumptions and delivery timelines led to revisions in projected benefits, aligned to the latest cost and phasing data. • In PBC4 we have reclassified the IFRS 16 (International Financial Reporting Standards) impacts which are no longer part of the financial case cash position based on NISTA (National Infrastructure and Service Transformation Authority) advice.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"The NISTA review carried out during January 2026 assessed the Programme as Amber indicating that WTP is in a good position to deliver further success. It noted that the Programme is well led and has strong inter-personal relationships with key stakeholders. The SRO has agreed the recommendations detailed in the report and an action plan has been developed.…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"WTP is complex, and as an enabling Programme it has a number of key dependencies including future size of the workforce, how that workforce is deployed, and the underpinning ways services are delivered (the operating model) during modernisation/transformation. The third iteration of the Programme Business Case (PBC) was approved by HMT in June 2025 with a fourth iteration of the Programme Business Case (PBC4) was approved on the 23/03/26 securing approval for a \"Balanced Approach\" to rationalise the estate into a smaller, more efficient, and sustainable footprint starting from FY2026/27. Deliverables achieved within 25-26 include: · Closure of selected Jobcentres and Service and Support Centres · Decommissioned temporary jobcentres established to support customers during the pandemic. Only one temporary jobcentre remains open to the public and this will be converted to a permanent jobcentre. · Completed investment work in Jobcentre and Service and Support Centre sites to improve the standard of buildings. · Progression of high-profile office moves in London · Moved colleagues into ‘award winning’ Fylde View building in Blackpool, contributing to wider local authority plans to regenerate the town centre. · Started construction of new Newcastle hub - due for completion in 2027. · Installation of 255 electric car charging points at over 100 DWP sites saving over 199.76 tonnes of CO2 to date. · Repaired or installed cycle racks at 94 sites. · Installation of Under Setting Sensors to improve our understanding of space utilisation within sites. · Feasibility work to inform future investment and divestment of sites · Launched a lift share app at five pilot sites, reducing travel costs and carbon impacts by facilitating shared commutes to the office. · Led on the implementation of 60% In Office Attendance across the Department.","narrativeClaimKind":null}],"previous":{"id":"DWP_0013_2122-Q2","year":2025,"name":"Workplace Transformation","department":"DWP","category":"Government Transformation and Service Delivery","description":"The Workplace Transformation Programme (WTP) is a 10-year programme to support the change to the Department’s operating model, consolidate the estate to the right size and shape and provide more flexible, efficient and better-quality sustainable buildings in alignment with the Government’s greening commitments, Places for Growth, levelling up the economy and building back better. Throughout the transformation, WTP remains committed to proactively support colleagues and customers through this period of change. WTP is working with other Programmes to modernise the services underpinning the DWP ambition of becoming a simpler, cheaper, and more efficient organisation, enabling our people to deliver quality outcomes; reflecting citizens’ and the Modern Civil Service’s needs: enhancing lives; enabling success; and ensuring value. WTP will deliver far more than a smaller, better, and greener estate modernisation. It will fundamentally reshape our support to customers, how we work, where we work and when we work, helping to make DWP a great place to work. It will also change the way people work through investing in new ways of working, changing the way staff use buildings by more flexible ways of working and to deliver on the Department’s obligations to fully embed Smarter Working and PAS 3000 standards and supporting the shift towards the delivery of digital services. WTP requires significant capital investment but delivers significant financial and social benefits each delivery year by consolidating and improving our workplace with a direct positive impact on customer experience and outcomes throughout the programme’s lifecycle.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The IPA review carried out during September 2024, assessed the Programme as Amber indicating that while there are significant challenges, the Programme is feasible and achievable. The Programme has almost completed its action plan to address the recommendations made, with just one remaining action due to be concluded by the end of July 2025. The rating recognises the transformation journey the department is on – with a dependency on other transformation programmes and the department’s evolving departmental operating model in terms of understanding the size of the estate, particularly beyond 2030. These are out with the programme’s control, although strong relationships have been built with those programmes.","startDate":"2020-07-01","endDate":"2030-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2030. This is primarily due to the following factors‚ WTP is complex, and as an enabling Programme it has a number of key dependencies including future size of the workforce, how that workforce is deployed, and the underpinning ways services are delivered (the operating model) during modernisation/transformation. The second iteration of the Programme Business Case (PBC) was approved by HMT in October 2023 with a third iteration currently with HMT awaiting approval as per annual refresh and iteration processes. The programme has been developing plans for 2025 to 2028, aligning its modelling with its Spending Review bid and scheduled lease expiry events in 2028, across the DWP estate. The Programme achieved its planned deliverables to ‘right size’ and improve the quality of the estate in 24/25. Deliverables achieved included: • Closure of selected ‘Back of House’, Front of House and Temporary Jobcentre sites • Investment work in sites to improve the standard of buildings and increase and improve the provision of Learning Design and Development rooms • Progression of high-profile office moves in London, Blackpool, and Newcastle • Installation of electric car charging points • Provision of cycle storage • Installation of Under Setting Sensors to improve our understanding of space utilisation within sites • Feasibility work to inform future investment and divestment of sites The Programme has been leading on the implementation of 60% In Office Attendance across the Department. Progress has been made to enable this. A Business Change approach has been developed to embed working practices which enable and encourage our colleagues to use our buildings effectively, helping us to; maximise the utilisation of our sites, support the development of inclusive communities, cultures and connections in our offices and deliver return on our investment.","fyBaseline":196.17,"fyForecast":113.45,"fyVariance":42.17,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The HMT approved baseline/departmental baseline is based on PBC2 which was completed in May 2023. Since then, the outturn has been subject to changes and reflects the latest delivery plans. There are a number of reasons for the movement between PBC2 and the 24/25 outturn. Firstly, cost assumptions have been updated since PBC2 to reflect the outcome of feasibility studies, and a series of deep dive scrutiny sessions. Some projects have not progressed whilst there are other projects that have been approved after the PBC2 was submitted. Excess fares in PBC2 have been removed, partly due to reductions in eligibility / take up and the balance being absorbed by the business. Other outturn reductions relate to a lower Programme staff cost as recruitment has not progressed as originally forecast. Enabling functions costs have been revised, along with a reduction in expenditure for Workplace Management Solutions due to the firming up of the preferred option. These movements were offset by dilapidations costs being higher than anticipated due to movement from the previous year as a result of extended negotiations to secure the best value settlement.","wholeLifeCost":3506.7,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 830 to 3506. This is primarily due to the following factors‚ There has been a change to data presentation only. Previously the HMT Approved/Departmental baseline recurrent costs were netted off in the benefits tab, hence benefit tab reflected the net benefits position. For Q4 for presentational purposes only, gross HMT Approved/Departmental baseline recurrent costs of £2,676.9m have been removed from the benefits tab and input under the costs tab (under recurring new costs). The net effect of this movement is nil.","benefits":5645.6,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 2969 to 5645. This is primarily due to the following factors‚ There has been a change to data presentation. Previously the HMT Approved/Departmental baseline recurrent costs were netted off in the benefits tab, hence benefit tab reflected the net benefits position. For Q4 for presentational purposes only, gross HMT Approved/Departmental baseline costs of £2,676.9m have been removed from the benefits tab and input under the costs tab (under recurring new costs). The net effect of this movement is nil.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The IPA review carried out during September 2024, assessed the Programme as Amber indicating that while there are significant challenges, the Programme is feasible…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2030. This is primarily due to the following factors‚ WTP is complex, and as an enabling Programme it has a number of key dependencies including future size of the workforce, how that workforce is deployed, and the underpinning ways services are delivered (the operating model) during modernisation/transformation. The second iteration of the Programme Business Case (PBC) was approved by HMT in October 2023 with a third iteration currently with HMT awaiting approval as per annual refresh and iteration processes. The programme has been developing plans for 2025 to 2028, aligning its modelling with its Spending Review bid and scheduled lease expiry events in 2028, across the DWP estate. The Programme achieved its planned deliverables to ‘right size’ and improve the quality of the estate in 24/25. Deliverables achieved included: • Closure of selected ‘Back of House’, Front of House and Temporary Jobcentre sites • Investment work in sites to improve the standard of buildings and increase and improve the provision of Learning Design and Development rooms • Progression of high-profile office moves in London, Blackpool, and Newcastle • Installation of electric car charging points • Provision of cycle storage • Installation of Under Setting Sensors to improve our understanding of space utilisation within sites • Feasibility work to inform future investment and divestment of sites The Programme has been leading on the implementation of 60% In Office Attendance across the Department. Progress has been made to enable this. A Business Change approach has been developed to embed working practices which enable and encourage our colleagues to use our buildings effectively, helping us to; maximise the utilisation of our sites, support the development of inclusive communities, cultures and connections in our offices and deliver return on our investment.","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":365,"attentionScore":38,"attentionReasons":["Current published delivery confidence is Amber","Published end date moved 365 days later"]},{"id":"MOD_0009_2122-Q2","year":2026,"name":"CHINOOK CAPABILITY SUSTAINMENT PROGRAMME (CSP)","department":"MOD","category":"Military Capability","description":"Chinook Capability Sustainment Programme Tranche 1 will provide a modern and cost effective transformational change to the UK Special User's vertical heavy lift capability with the procurement of 14 new-build Extended Range Chinook aircraft (H-47(ER)). The aircraft will be able to operate and survive in a multitude of environments, conducting high-tempo missions with minimal logistics footprint and high-levels of interoperability with key allies, to beyond 2050.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors. 1. Continued uncertainty around actual infrastructure cost and schedule (mitigations underway to deliver programme milestones without supporting infrastructure), ability to develop required information solutions that are affordable and deliverable on schedule and, workforce shortages in key areas. 2. Value engineering is underway to ensure the programme remains affordable.","startDate":"2017-03-31","endDate":"2030-10-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 31/12/2030. This is contingent on mitigations around delivering training ahead of infrastructure delivery.","fyBaseline":300.45,"fyForecast":239.62,"fyVariance":20.24,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. 1. The budget variance is driven by delays in infrastructure and information systems contracting, maturing costs associated with production and GBP/USD forex rate changes.","wholeLifeCost":1959.31,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) increased from £1913.51M to £1948.89M. This is primarily due to the following factors. 1. The Whole Life Cost forecast is subject to further review due to Infrastructure cost growth - the scale of which is yet to be determined. 2. There is similar uncertainty around information systems cost and deliverability that are currently being assessed.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors. 1. Continued uncertainty around actual infrastructure cost and schedule (mitigations underway to deliver programme milestones without supporting infrastructure), ability to develop…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":true,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 31/12/2030. This is contingent on mitigations around delivering training ahead of infrastructure delivery.","narrativeClaimKind":"date-mismatch","history":[{"id":"MOD_0009_2122-Q2","year":2022,"name":"CHINOOK CAPABILITY SUSTAINMENT PROGRAMME (CSP)","department":"MOD","category":"Military Capability","description":"Chinook Capability Sustainment Programme will provide a modern, cost-effective, Vertical Heavy Lift helicopter fleet that will be able to operate and survive in a multitude of environments, conducting high-tempo missions with minimal logistics footprint and high-levels of interoperability with key allies, to beyond 2050. Tranche 1 of the Programme delivers a transformational capability through the procurement of 14 new-build Chinook aircraft.","ipaDca":"Green","sroDca":null,"deliveryConfidence":"Green","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure and Project Authority's Delivery Confidence Assessment rating at 21/22 Q4 is Green. This is primarily due to the following factors: Although a recent entry onto the Government major Projects portfolio successful delivery appears highly likely ans there are no major outstanding issues that at this stage appear to threaten delivery.","startDate":"2017-03-31","endDate":"2030-12-31","scheduleNarrative":"The project end-date is 31 December 2030. This is primarily due to the following factors: The Programme's strategic capability milestones will be formalised once the full analysis of the 'Bring Forward' direction from Ministers is complete. This effectively re-baselines the Programme.","fyBaseline":30.43,"fyForecast":103.9,"fyVariance":243.0,"varianceNarrative":"The budget variance exceeds 5%. The current forecast overspend variance is as a result of the bring forward of Long Lead Time item and the confirmation of requirements against the existing agreements. This action is expected to reduce cost growth in later years.","wholeLifeCost":1519.0,"costNarrative":"The Baseline Whole Life Cost is 1518.78 (£m). This is primarily due to the following factors: The project departmental-agreed Whole Life Cost at 21/22-Q4 is £2,154M until the Chinook Capability Sustainment Programme out-of-service date of 2050. This figure includes £1518.781M captured as the programme's 10 year provision that includes initial aircraft procurement and initial support equipment.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Workforce & capability","Commercial & supply chain"],"evidenceExcerpt":"The Infrastructure and Project Authority's Delivery Confidence Assessment rating at 21/22 Q4 is Green. This is primarily due to the following factors: Although a recent entry onto the Government major Projects portfolio successful delivery appears highly likely ans there are no major outstanding issues that at this stage appear to threaten delivery. The…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project end-date is 31 December 2030. This is primarily due to the following factors: The Programme's strategic capability milestones will be formalised once the full analysis of the 'Bring Forward' direction from Ministers is complete. This effectively re-baselines the Programme.","narrativeClaimKind":null},{"id":"MOD_0009_2122-Q2","year":2023,"name":"CHINOOK CAPABILITY SUSTAINMENT PROGRAMME (CSP)","department":"MOD","category":"Military Capability","description":"Chinook Capability Sustainment Programme Tranche 1 will provide a modern and cost effective transformational change to the UK Special User's vertical heavy lift capability with the procurement of 14 new-build Chinook aircraft. The aircraft will be able to operate and survive in a multitude of environments, conducting high-tempo missions with minimal logistics footprint and high-levels of interoperability with key allies, to beyond 2050.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 decreased from Green (IPA rating) to Amber (SRO rating). This is primarily due to the following factors. Inflationary pressures and supply chain delays will increase affordability risk and programme success relies heavily on the release of capability information from the US to the UK. The Programme is currently working through rescheduling activities with the US Department of Defence which will culminate in a revised schedule and financial profile. The lack of key skills and experience, though mitigated by the arrival of a new Programme Director, Programme Manager and five Programme Control contractors, remains a risk given the high degree of churn.","startDate":"2017-03-31","endDate":"2030-12-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2030-12-31. This is primarily due to the following factors. NA","fyBaseline":85.35,"fyForecast":56.51,"fyVariance":-34.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors: The Programme has not been able to commit funds at the rate anticipated as a consequence of US Government's delay in placing contracts due to resourcing challenges.","wholeLifeCost":1602.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 increased from 1519m. to 1602m. This is primarily due to the following factors. The cost growth due to a net 18 month deferral. The programme will re-baseline when the full implications are confirmed.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This programme does not report cashable benefits. Its aim is to provision the armed forces with the equipment and / or infrastructure required.","themes":["Cost & funding","Delivery & schedule","Workforce & capability","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 decreased from Green (IPA rating) to Amber (SRO rating). This is primarily due to the following factors. Inflationary pressures and supply chain delays will increase affordability risk and programme success relies heavily on the release of capability information from…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2030-12-31. This is primarily due to the following factors. NA","narrativeClaimKind":null},{"id":"MOD_0009_2122-Q2","year":2024,"name":"CHINOOK CAPABILITY SUSTAINMENT PROGRAMME (CSP)","department":"MOD","category":"Military Capability","description":"Chinook Capability Sustainment Programme Tranche 1 will provide a modern and cost effective transformational change to the UK Special User's vertical heavy lift capability with the procurement of 14 new-build Extended Range Chinook aircraft (H-47(ER)). The aircraft will be able to operate and survive in a multitude of environments, conducting high-tempo missions with minimal logistics footprint and high-levels of interoperability with key allies, to beyond 2050.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors, recorded in the Infrastructure and Projects Authority Gateway 0/3 Review. Aircraft certification risk (information sharing between the US and the UK) and workforce capability shortfalls. Despite the increased costs to the programme following the 3-year deferral, the programme remains affordable, subject to HM Treasury approval.","startDate":"2017-03-31","endDate":"2030-12-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2030-12-31. This is primarily due to the following factors. A recent Scheduled Risk Analysis was conducted by the Delivery Team, which subsequently formed the basis of the Review Note submitted to the Investments Approvals Committee to re-baseline the programme following the 3-year deferral. Targeted efforts to reconcile programme schedules, assumptions and risks into a programme-wide integrated Master Schedule are due to be completed in April 2024.","fyBaseline":148.56,"fyForecast":145.97,"fyVariance":-1.743,"varianceNarrative":"The budget variance is less than or equal to 5%","wholeLifeCost":1861.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 increased from 1602m to 1861m. This is primarily due to the following factors. The UK decision in 2021 to defer H-47(ER) aircraft production by 3 years, compounded by adverse inflation and Forex cost increases, resulted in significant cost growth. However, negotiations with the US Government and other measures taken since June 2023 have reduced the growth to an affordable level without reducing the scope of the Programme or impacting capability.","benefits":0.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 0m.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors, recorded in the Infrastructure and Projects Authority Gateway 0/3 Review. Aircraft certification risk (information sharing between the US and the UK) and workforce…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2030-12-31. This is primarily due to the following factors. A recent Scheduled Risk Analysis was conducted by the Delivery Team, which subsequently formed the basis of the Review Note submitted to the Investments Approvals Committee to re-baseline the programme following the 3-year deferral. Targeted efforts to reconcile programme schedules, assumptions and risks into a programme-wide integrated Master Schedule are due to be completed in April 2024.","narrativeClaimKind":null},{"id":"MOD_0009_2122-Q2","year":2025,"name":"CHINOOK CAPABILITY SUSTAINMENT PROGRAMME (CSP)","department":"MoD","category":"Military Capability","description":"Chinook Capability Sustainment Programme Tranche 1 will provide a modern and cost effective transformational change to the UK Special User's vertical heavy lift capability with the procurement of 14 new-build Extended Range Chinook aircraft (H-47(ER)). The aircraft will be able to operate and survive in a multitude of environments, conducting high-tempo missions with minimal logistics footprint and high-levels of interoperability with key allies, to beyond 2050.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. Aircraft certification risk (information sharing between the US and the UK); workforce capability shortfalls.","startDate":"2017-03-31","endDate":"2030-12-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/12/2030.","fyBaseline":314.44,"fyForecast":274.75,"fyVariance":12.62,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The in year underspend is due to the delay to Letter of Offer and Acceptance signature and knock on impact to the placing of US Government contracts. This will be re-profiled in Public Contract Regulations (PCR) 25.","wholeLifeCost":1913.51,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 1861 to 1913. This is primarily due to the following factors. The UK's decision in 2021 to defer H-47(ER) aircraft production by 3 years, compounded by adverse inflation and Forex cost increases which has resulted in significant cost growth. However, negotiations with the US Government and other measures taken since June 2023 have reduced the growth to an affordable level without reducing the scope of the Programme or impacting capability.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Workforce & capability","Commercial & supply chain","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. Aircraft certification risk (information sharing between the US and the UK); workforce capability shortfalls. Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/12/2030.","narrativeClaimKind":null},{"id":"MOD_0009_2122-Q2","year":2026,"name":"CHINOOK CAPABILITY SUSTAINMENT PROGRAMME (CSP)","department":"MOD","category":"Military Capability","description":"Chinook Capability Sustainment Programme Tranche 1 will provide a modern and cost effective transformational change to the UK Special User's vertical heavy lift capability with the procurement of 14 new-build Extended Range Chinook aircraft (H-47(ER)). The aircraft will be able to operate and survive in a multitude of environments, conducting high-tempo missions with minimal logistics footprint and high-levels of interoperability with key allies, to beyond 2050.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors. 1. Continued uncertainty around actual infrastructure cost and schedule (mitigations underway to deliver programme milestones without supporting infrastructure), ability to develop required information solutions that are affordable and deliverable on schedule and, workforce shortages in key areas. 2. Value engineering is underway to ensure the programme remains affordable.","startDate":"2017-03-31","endDate":"2030-10-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 31/12/2030. This is contingent on mitigations around delivering training ahead of infrastructure delivery.","fyBaseline":300.45,"fyForecast":239.62,"fyVariance":20.24,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. 1. The budget variance is driven by delays in infrastructure and information systems contracting, maturing costs associated with production and GBP/USD forex rate changes.","wholeLifeCost":1959.31,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) increased from £1913.51M to £1948.89M. This is primarily due to the following factors. 1. The Whole Life Cost forecast is subject to further review due to Infrastructure cost growth - the scale of which is yet to be determined. 2. There is similar uncertainty around information systems cost and deliverability that are currently being assessed.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors. 1. Continued uncertainty around actual infrastructure cost and schedule (mitigations underway to deliver programme milestones without supporting infrastructure), ability to develop…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":true,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 31/12/2030. This is contingent on mitigations around delivering training ahead of infrastructure delivery.","narrativeClaimKind":"date-mismatch"}],"previous":{"id":"MOD_0009_2122-Q2","year":2025,"name":"CHINOOK CAPABILITY SUSTAINMENT PROGRAMME (CSP)","department":"MoD","category":"Military Capability","description":"Chinook Capability Sustainment Programme Tranche 1 will provide a modern and cost effective transformational change to the UK Special User's vertical heavy lift capability with the procurement of 14 new-build Extended Range Chinook aircraft (H-47(ER)). The aircraft will be able to operate and survive in a multitude of environments, conducting high-tempo missions with minimal logistics footprint and high-levels of interoperability with key allies, to beyond 2050.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. Aircraft certification risk (information sharing between the US and the UK); workforce capability shortfalls.","startDate":"2017-03-31","endDate":"2030-12-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/12/2030.","fyBaseline":314.44,"fyForecast":274.75,"fyVariance":12.62,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The in year underspend is due to the delay to Letter of Offer and Acceptance signature and knock on impact to the placing of US Government contracts. This will be re-profiled in Public Contract Regulations (PCR) 25.","wholeLifeCost":1913.51,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 1861 to 1913. This is primarily due to the following factors. The UK's decision in 2021 to defer H-47(ER) aircraft production by 3 years, compounded by adverse inflation and Forex cost increases which has resulted in significant cost growth. However, negotiations with the US Government and other measures taken since June 2023 have reduced the growth to an affordable level without reducing the scope of the Programme or impacting capability.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Workforce & capability","Commercial & supply chain","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. Aircraft certification risk (information sharing between the US and the UK); workforce capability shortfalls. Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/12/2030.","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":-61,"attentionScore":37,"attentionReasons":["Published commentary says the end date is unchanged while the published date moved","Current published delivery confidence is Amber","In-year forecast variance is +20.2%"]},{"id":"MOJ_0057_2122-Q1","year":2026,"name":"Rapid Deployment Cells Project","department":"MOJ","category":"Infrastructure and Construction","description":"The Rapid Deployment Cells Programme supports our 20,000 additional prison places commitment; its scope is to offer a flexible capacity solution across the prison estate.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25-Q4, the NISTA Delivery Confidence Assessment rating at 25/26-Q4 remains at Amber. This is primarily due to delays arising following the administration of a key supplier and challenging site conditions.​","startDate":"2021-07-27","endDate":"2028-07-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end date at 25/26-Q4 changed from 28/02/28 to 31/07/2028. This is primarily due to schedule slippage across multiple sites.","fyBaseline":147.57,"fyForecast":105.0,"fyVariance":28.85,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to delays following supplier entering administration and challenging site conditions, requiring some costs to be re-profiled into future financial years.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"This programme currently reports no monetised benefits. Due to the projected increasing prisons population, this programme focusses on increasing capacity and there are no monetised benefits to be claimed. The programme's other benefits are defined in the current baseline as: construction benefits and outcomes (capacity, modern methods of construction and sustainability); to enable an improvement in prisoner rehabilitation outcomes; and, during its construction, to deliver local community benefits.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 24/25-Q4, the NISTA Delivery Confidence Assessment rating at 25/26-Q4 remains at Amber. This is primarily due to delays arising following the administration of a key supplier and challenging site conditions.​ Compared to financial year 24/25-Q4, the project's end date at 25/26-Q4 changed from 28/02/28 to 31/07/2028. This is…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end date at 25/26-Q4 changed from 28/02/28 to 31/07/2028. This is primarily due to schedule slippage across multiple sites.","narrativeClaimKind":null,"history":[{"id":"MOJ_0057_2122-Q1","year":2022,"name":"Rapid Deployment Cells Project","department":"MOJ","category":"Infrastructure and Construction","description":"RDCP offers a flexible short-term capacity solution across the prison estate. It is designed to provide a significant number of spaces and to be delivered at pre-determined sites by December 2022. The units are a temporary measure to help manage the population demand.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 is Red. This is the first time data has been published for this project, which has been added to GMPP over the last year. The DCA at 21/22-Q4 is Red primarily due to the following factors: Following significant inflation in the UK construction market expected costs are higher than previously estimated, as a result the project is evaluating a variety of delivery options to ensure value for money and improved to 'amber' delivery confidence for the next reporting quarter","startDate":"2020-08-17","endDate":"2024-03-01","scheduleNarrative":"Your project end-date is 01 MAR 2024. This is primarily due to the following factors: The project end date is scheduled as March 2024.","fyBaseline":5.0,"fyForecast":5.0,"fyVariance":0.0,"varianceNarrative":"The in year variance is below or equal to 5% so narrative is required.","wholeLifeCost":244.0,"costNarrative":"Your projects Baseline Whole Life Cost is 243.50 (£m). This is primarily due to the following factors: The project is currently awaiting Full Business Case approval. The costs of the project included in this case reflect changes in the costs driven, in part, by inflation rises, as well as a better understanding of the requirement.","benefits":null,"benefitsNarrative":"","themes":["Commercial & supply chain","Delivery & schedule","Approvals & decisions","Cost & funding"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 is Red. This is the first time data has been published for this project, which has been added to GMPP over the last year. The DCA at 21/22-Q4 is Red primarily due to the following factors: Following significant inflation in the UK construction market expected costs are…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Your project end-date is 01 MAR 2024. This is primarily due to the following factors: The project end date is scheduled as March 2024.","narrativeClaimKind":null},{"id":"MOJ_0057_2122-Q1","year":2023,"name":"Rapid Deployment Cells Project","department":"MOJ","category":"Infrastructure and Construction","description":"Rapid Deployment Cells offers a flexible capacity solution across the prison estate. The project is designed to provide a significant number of spaces at pre-determined sites.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 increased from Red (SRO rating) to Amber (IPA rating). This is primarily due to the following factors. Compared to21/22 Q4, theproject'sDelivery Confidence Assessment has improved from Red to Amber.TheAmber assessment is due to planning permission delays, changes tobuilding regulations and challenges in sourcing sufficient utilities to support sites.The project is managing the cost challenges that drove the Red rating last year and developed a business case that consolidates the two phases of the project into a single programme in two phases. One site has fully delivered.","startDate":"2020-08-17","endDate":null,"scheduleNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","fyBaseline":104.06,"fyForecast":99.06,"fyVariance":-5.0,"varianceNarrative":"Variance is less than 5%, so no narrative required","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This project currently reports no monetised benefits. Due to the projected increasing prisons population, this project focusses on increasing capacity and there are no monetised benefits to be claimed. The programme's other benefits are defined in the current baseline as: construction benefits and outcomes (capacity, modern methods of construction and sustainability); to enable an improvement in prisoner rehabilitation outcomes; and, during its construction, deliver local community benefits.","themes":["Commercial & supply chain","Cost & funding","Approvals & decisions","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 increased from Red (SRO rating) to Amber (IPA rating). This is primarily due to the following factors. Compared to21/22 Q4, theproject'sDelivery Confidence Assessment has improved from Red to Amber.TheAmber assessment is due to planning permission delays, changes…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","narrativeClaimKind":null},{"id":"MOJ_0057_2122-Q1","year":2024,"name":"Rapid Deployment Cells Project","department":"MOJ","category":"Infrastructure and Construction","description":"The Rapid Deployment Cells Programme supports our 20,000 additional prison places commitment; its scope is to offer a flexible capacity solution across the prison estate.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. Delays to the delivery of Tranche 2 sites mainly driven by planning permission delays and challenging site conditions. Twelve sites have been fully delivered.","startDate":"2020-08-17","endDate":null,"scheduleNarrative":"Exempt under Section 22 of the Freedom of Information Act 2000 (Information intended for future publication)","fyBaseline":129.59,"fyForecast":147.45,"fyVariance":14.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The overspend is due to increased construction costs due to inflation following planning permission delays and challenging site conditions.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":0.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 0m. This project currently reports no monetised benefits. Due to the projected increasing prisons population, this project focusses on increasing capacity and there are no monetised benefits to be claimed.","themes":["Commercial & supply chain","Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. Delays to the delivery of Tranche 2 sites mainly driven by planning permission delays and challenging site conditions. Twelve sites have been fully delivered. Exempt…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 22 of the Freedom of Information Act 2000 (Information intended for future publication)","narrativeClaimKind":null},{"id":"MOJ_0057_2122-Q1","year":2025,"name":"Rapid Deployment Cells Project","department":"MoJ","category":"Infrastructure and Construction","description":"The Rapid Deployment Cells Programme supports our 20,000 additional prison places commitment; its scope is to offer a flexible capacity solution across the prison estate.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at Amber. This is primarily due to the following factors… Delays following supplier entering administration and challenging site conditions.","startDate":"2020-08-17","endDate":"2028-02-28","scheduleNarrative":"The project's end-date at 24/25-Q4 is scheduled to be 28/02/2028. This is primarily due to the following factors‚ Delays following supplier entering administration and challenging site conditions.","fyBaseline":322.43,"fyForecast":87.77,"fyVariance":72.78,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ This is due to delays following supplier entering administration and challenging site conditions, requiring some costs to be re-profiled into future financial years.","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ This project currently reports no monetised benefits. Due to the projected increasing prisons population, this project focusses on increasing capacity and there are no monetised benefits to be claimed. The programme's other benefits are defined in the current baseline as: construction benefits and outcomes (capacity, modern methods of construction and sustainability); to enable an improvement in prisoner rehabilitation outcomes; and, during its construction, deliver local community benefits.","themes":["Commercial & supply chain","Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at Amber. This is primarily due to the following factors… Delays following supplier entering administration and challenging site conditions. The project's end-date at 24/25-Q4 is scheduled to be 28/02/2028. This is primarily…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 24/25-Q4 is scheduled to be 28/02/2028. This is primarily due to the following factors‚ Delays following supplier entering administration and challenging site conditions.","narrativeClaimKind":null},{"id":"MOJ_0057_2122-Q1","year":2026,"name":"Rapid Deployment Cells Project","department":"MOJ","category":"Infrastructure and Construction","description":"The Rapid Deployment Cells Programme supports our 20,000 additional prison places commitment; its scope is to offer a flexible capacity solution across the prison estate.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25-Q4, the NISTA Delivery Confidence Assessment rating at 25/26-Q4 remains at Amber. This is primarily due to delays arising following the administration of a key supplier and challenging site conditions.​","startDate":"2021-07-27","endDate":"2028-07-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end date at 25/26-Q4 changed from 28/02/28 to 31/07/2028. This is primarily due to schedule slippage across multiple sites.","fyBaseline":147.57,"fyForecast":105.0,"fyVariance":28.85,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to delays following supplier entering administration and challenging site conditions, requiring some costs to be re-profiled into future financial years.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"This programme currently reports no monetised benefits. Due to the projected increasing prisons population, this programme focusses on increasing capacity and there are no monetised benefits to be claimed. The programme's other benefits are defined in the current baseline as: construction benefits and outcomes (capacity, modern methods of construction and sustainability); to enable an improvement in prisoner rehabilitation outcomes; and, during its construction, to deliver local community benefits.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 24/25-Q4, the NISTA Delivery Confidence Assessment rating at 25/26-Q4 remains at Amber. This is primarily due to delays arising following the administration of a key supplier and challenging site conditions.​ Compared to financial year 24/25-Q4, the project's end date at 25/26-Q4 changed from 28/02/28 to 31/07/2028. This is…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end date at 25/26-Q4 changed from 28/02/28 to 31/07/2028. This is primarily due to schedule slippage across multiple sites.","narrativeClaimKind":null}],"previous":{"id":"MOJ_0057_2122-Q1","year":2025,"name":"Rapid Deployment Cells Project","department":"MoJ","category":"Infrastructure and Construction","description":"The Rapid Deployment Cells Programme supports our 20,000 additional prison places commitment; its scope is to offer a flexible capacity solution across the prison estate.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at Amber. This is primarily due to the following factors… Delays following supplier entering administration and challenging site conditions.","startDate":"2020-08-17","endDate":"2028-02-28","scheduleNarrative":"The project's end-date at 24/25-Q4 is scheduled to be 28/02/2028. This is primarily due to the following factors‚ Delays following supplier entering administration and challenging site conditions.","fyBaseline":322.43,"fyForecast":87.77,"fyVariance":72.78,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ This is due to delays following supplier entering administration and challenging site conditions, requiring some costs to be re-profiled into future financial years.","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ This project currently reports no monetised benefits. Due to the projected increasing prisons population, this project focusses on increasing capacity and there are no monetised benefits to be claimed. The programme's other benefits are defined in the current baseline as: construction benefits and outcomes (capacity, modern methods of construction and sustainability); to enable an improvement in prisoner rehabilitation outcomes; and, during its construction, deliver local community benefits.","themes":["Commercial & supply chain","Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at Amber. This is primarily due to the following factors… Delays following supplier entering administration and challenging site conditions. The project's end-date at 24/25-Q4 is scheduled to be 28/02/2028. This is primarily…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 24/25-Q4 is scheduled to be 28/02/2028. This is primarily due to the following factors‚ Delays following supplier entering administration and challenging site conditions.","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":154,"attentionScore":37,"attentionReasons":["Current published delivery confidence is Amber","Published end date moved 154 days later","In-year forecast variance is +28.9%"]},{"id":"MOD_0122_2021-Q4","year":2026,"name":"FUTURE COMBAT AIR SYSTEM","department":"MOD","category":"Military Capability","description":"The Future Combat Air System (FCAS) programme will identify the combat air system to replace Typhoon, which will retire from service from the mid-2030s. FCAS will be primarily responsible for delivering Control of the Air, and contribute to Attack and Information, Surveillance and Reconnaissance. Military advantage in Combat Air will require a System of highly adaptable and networked capabilities, that together deliver military effects greater than the sum of the parts. Able to operate inside a multi-domain information environment or in isolation, the system will exploit open mission architectures to allow freedom of modification and rapid technology insertion. The System will be enabled through a combination of core platforms, uncrewed additives and complex weapons with the optimal force mix to be determined during the Concept and Assessment Phase. An international programme by design, the UK is working with several international partners to define the longer-term partnership construct for the Enterprise.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Red. This is primarily due to the following factors. 1. The continued Red rating reflects the programme’s relative maturity, its scale and the complexity involved in meeting the challenges of successful design, delivery and support of a 6th generation fighter jet. The immediate focus is securing the necessary multi-year funding and approval settlements that will allow the Global Combat Air Programme (GCAP) to move to the next phase and see the first international development contract between the GCAP Agency and the tri-national Edgewing Joint Venture signed. 2. Other challenges faced by the programme include the design and delivery of a tri-national secure digital network and Collaborative Working Environment that equally supports novel approaches to digital engineering and digital qualification and certification objectives, whilst ensuring cyber resiliency and intellectual property protections.","startDate":"2019-04-26","endDate":null,"scheduleNarrative":"Exempt under Section 22 - Information intended for future publication","fyBaseline":1466.97,"fyForecast":1398.74,"fyVariance":4.65,"varianceNarrative":"The budget variance is less than 5%.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Technical & integration","Cost & funding","Delivery & schedule","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Red. This is primarily due to the following factors. 1. The continued Red rating reflects the programme’s relative maturity, its scale and the complexity involved in meeting the challenges of successful design, delivery and support of a 6th…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 22 - Information intended for future publication","narrativeClaimKind":null,"history":[{"id":"MOD_0122_2021-Q4","year":2021,"name":"Future Combat Air System","department":"MOD","category":"Military Capability","description":"Future Combat Air will play a vital role in the United Kingdom's military strategic capabilities for decades to come, enabling us to defend the United Kingdom, our allies, and make a decisive contribution to global security. The Future Combat Air Systems Programme will design and deliver innovative systems of highly networked crewed and uncrewed air vehicles, sensors and effectors to be able to operate in a range of complex and evolving threat environments and preserve operational advantage for future decades.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber/red.This is primarily due to the following factors: Through the Integrated Review of Security, Defence, Development and Foreign Policy the Future Combat Air System received investment for the first 4-years to complete the Concept and Assessment Phase. A phase that will complete an Alternative System Review of the Future Combat Air System including the Core Platform, as well as establishing the international partnerships. The level of investment was significantly less than required, however it preserves the feasibility of the programme within current parameters, but adds significant overall programme risk, particularly to the assumed date for Initial Operating Capability. The Concept and Assessment Phase will provide the evidence for Programme viability including level of additional investment and/or other options for the provision of Combat Air. Investments and milestones beyond this phase are subject to a margin of error in terms of time, cost and performance that will be refined prior to the next decision gate.","startDate":"2019-04-26","endDate":"2070-12-31","scheduleNarrative":"The project end-date is 31 December 2070. This is primarily due to the following factors: To support an Outline Business Case submission to the Investment Approvals Committee, a detailed schedule to support the 4-year Concept and Assessment phase of the programme was completed. This was based on a UK investment of �1.65Bn over the 4 years in line with the Future Combat Air System Acquisition Programme proposition in the Integrated Review of Security, Defence, Development and Foreign Policy. Through Annual Budgeting Cycle 21 the UK funding has been capped at �1.2Bn. Whilst a full review of the schedule to the next decision gate is required, it is not envisaged that this reduction will have significant impact on meeting the critical milestones for the Concept and Assessment Phase. However, it significantly increases the Programme Risk in the next phase to Full Business Case and further pressure through Annual Budgeting Cycle 21 on the 10-year profile increases the risk to Initial Operating Capability. This will need to be tested at the next decision gate, when other factors including international investment; levels of transformation and requirements are better understood.","fyBaseline":5.39,"fyForecast":5.27,"fyVariance":-2.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":9467.0,"costNarrative":"The projects Baseline Whole Life Cost is �9467.00m. This is primarily due to the following factors: This is baseline funding allocated to the Programme as of 31 March 2021. It is not the anticipated Whole Life Costs of the Programme which is �72b","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Approvals & decisions","Governance & assurance","Delivery & schedule"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber/red.This is primarily due to the following factors: Through the Integrated Review of Security, Defence, Development and Foreign Policy the Future Combat Air System received investment for the first 4-years to complete the Concept and Assessment Phase. A phase that will…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project end-date is 31 December 2070. This is primarily due to the following factors: To support an Outline Business Case submission to the Investment Approvals Committee, a detailed schedule to support the 4-year Concept and Assessment phase of the programme was completed. This was based on a UK investment of �1.65Bn over the 4 years in line with the Future Combat Air System Acquisition Programme proposition in the Integrated Review of Security, Defence, Development and Foreign Policy. Through Annual Budgeting Cycle 21 the UK funding has been capped at �1.2Bn. Whilst a full review of the schedule to the next decision gate is required, it is not envisaged that this reduction will have significant impact on meeting the critical milestones for the Concept and Assessment Phase. However, it significantly increases the Programme Risk in the next phase to Full Business Case and further pressure through Annual Budgeting Cycle 21 on the 10-year profile increases the risk to Initial Operating Capability. This will need to be tested at the next decision gate, when other factors including international investment; levels of transformation and requirements are better understood.","narrativeClaimKind":null},{"id":"MOD_0122_2021-Q4","year":2022,"name":"Future Combat Air System","department":"MOD","category":"Military Capability","description":"Future Combat Air will play a vital role in the United Kingdom's military strategic capabilities for decades to come, enabling us to defend the United Kingdom, our allies, and make a decisive contribution to global security. The Future Combat Air Systems Programme will design and deliver innovative systems of highly networked crewed and uncrewed air vehicles, sensors and effectors to be able to operate in a range of complex and evolving threat environments and preserve operational advantage for future decades.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating increased from Amber/Red to Amber. This is primarily due to the following factors: The removal of the incremental Amber/Red and Amber/Green assessment ratings. The programme is in the Concept and Assessment Phase which will provide the evidence for Programme viability including the level of additional investment and/or other options for the provision of Combat Air ahead of submitting the Outline Business Case 2 in October 24.","startDate":"2019-04-26","endDate":"2070-12-31","scheduleNarrative":"Compared to 2021-Q4, the project end-date remained scheduled to finish on 31 December 70.","fyBaseline":77.3,"fyForecast":78.33,"fyVariance":0.0,"varianceNarrative":"The budget variance is inferior or equal to 5%.","wholeLifeCost":10687.0,"costNarrative":"Compared to 2021-Q4, the projects Baseline Whole Life Cost has increased by £10677.30M (£9.467M at Q4 20/21 and £10686.767M at Q4 21/22). This is primarily due to the following factors: At Q4 20/21 the project only had SOC approval and was awaiting approval of the Outline Business Case 1 that provided the Approved Budgetary Level for the 4-year Concept and Assessment Phase (£1.2Bn). Further provision has been provided over the remaining years of the Annual Budget Cycle period, the actual costs and funding required to be confirmed in the Outline Business Case 2 in October 24.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Approvals & decisions","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating increased from Amber/Red to Amber. This is primarily due to the following factors: The removal of the incremental Amber/Red and Amber/Green assessment ratings. The programme is in the Concept and Assessment Phase which will provide the evidence…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to 2021-Q4, the project end-date remained scheduled to finish on 31 December 70.","narrativeClaimKind":null},{"id":"MOD_0122_2021-Q4","year":2023,"name":"Future Combat Air System","department":"MOD","category":"Military Capability","description":"The Future Combat Air System Acquisition Programme will identify the combat air system to replace Typhoon. The Future Combat Air System will be primarily responsible for delivering Control of the Air, and contribute to Attack and Information, Surveillance and Reconnaissance. It will be able to operate inside a multi-domain information environment or in isolation. The system will exploit open mission architectures to allow freedom of modification and rapid technology insertion. It will be enabled through a combination of crewed and uncrewed platforms and complex weapons with the optimal force mix to be determined during the Concept and Assessment Phase. An international programme by design, the UK is working with several international partners to define the longer-term partnership construct for the Enterprise","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 decreased from Amber to Red. This is primarily due to the following factors. On-going dependencies impacting the programme from other MOD areas and a shortage of resources impacting skills and capabilities. Other programme areas have remained Amber since Q4 2021 with on-going mitigation in progress. Remedial action for a route to Amber is being implemented but it is expected to take several years to achieve due to the size and complexity of the programme.","startDate":"2019-04-26","endDate":"2070-12-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2070-12-31. This is primarily due to the following factors. NA","fyBaseline":256.94,"fyForecast":247.77,"fyVariance":-4.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":12556.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 increased from 10687m. to 12556m. This is primarily due to the following factors. The inclusion of a budget for FY32/33.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This programme does not report cashable benefits. Its aim is to provision the armed forces with the equipment and / or infrastructure required.","themes":["Cost & funding","Delivery & schedule","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 decreased from Amber to Red. This is primarily due to the following factors. On-going dependencies impacting the programme from other MOD areas and a shortage of resources impacting skills and capabilities. Other programme areas have…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2070-12-31. This is primarily due to the following factors. NA","narrativeClaimKind":null},{"id":"MOD_0122_2021-Q4","year":2024,"name":"Future Combat Air System","department":"MOD","category":"Military Capability","description":"The Future Combat Air System Acquisition Programme will identify the combat air system to replace Typhoon, which will retire from service from the mid-2030s. FCAS will be primarily responsible for delivering Control of the Air, and contribute to Attack and Information, Surveillance and Reconnaissance. Military advantage in Combat Air will require a System of highly adaptable and networked capabilities, that together deliver military effects greater than the sum of the parts. Able to operate inside a multi-domain information environment or in isolation, the system will exploit open mission architectures to allow freedom of modification and rapid technology insertion. The System will be enabled through a combination of core platforms, uncrewed additives and complex weapons with the optimal force mix to be determined during the Concept and Assessment Phase. An international programme by design, the UK is working with several international partners to define the longer-term partnership construct for the Enterprise","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure and Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Red. This is primarily due to the following factors. This is a reflection of the Programme’s relative maturity, its scale, pace and the complex challenges involved in the successful long-term delivery of a 6th generation fighter jet. The IPA have reported that a RED DCA would be expected at this stage. Significant achievements have already been made, having recently signed a treaty with tri-lateral Global Combat Air Programme (GCAP) partners Italy and Japan in December 2023, but the Programme remains in the early stages of development and we recognise the scale of challenges to stand up a programme of this nature. We are taking actions to address this at the start of the Programme, by learning the lessons of the past and from similarly large and complex projects.","startDate":"2019-04-26","endDate":null,"scheduleNarrative":"Exempt under Section 26 of the Freedom of Information Act 2000 (Defence)","fyBaseline":402.59,"fyForecast":504.05,"fyVariance":25.202,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. MOD approved uplift to maintain pace with the required Trilateral Global Combat Air Programme (GCAP) schedule, especially on Product Definition and critical enabling activity (such as Secure Infrastructure and Digital Infrastructure)’.","wholeLifeCost":null,"costNarrative":"Exempt under Section 26 of the Freedom of Information Act 2000 (Defence)","benefits":0.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 0m.","themes":["Delivery & schedule","Cost & funding","Technical & integration"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure and Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Red. This is primarily due to the following factors. This is a reflection of the Programme’s relative maturity, its scale, pace and the complex challenges involved in the successful long-term delivery of a 6th…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 26 of the Freedom of Information Act 2000 (Defence)","narrativeClaimKind":null},{"id":"MOD_0122_2021-Q4","year":2025,"name":"FUTURE COMBAT AIR SYSTEM","department":"MoD","category":"Military Capability","description":"The Future Combat Air System (FCAS) programme will identify the combat air system to replace Typhoon, which will retire from service from the mid-2030s. FCAS will be primarily responsible for delivering Control of the Air, and contribute to Attack and Information, Surveillance and Reconnaissance. Military advantage in Combat Air will require a system of highly adaptable and networked capabilities, that together deliver military effects greater than the sum of the parts. Able to operate inside a multi-domain information environment or in isolation, the system will exploit open mission architectures to allow freedom of modification and rapid technology insertion. The system will be enabled through a combination of core platforms, uncrewed additives and complex weapons, with the optimal force mix to be determined during the Concept and Assessment Phase. An international programme by design, the UK is working with several international partners to define the longer-term partnership construct for the Enterprise.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at RED. This is primarily due to the following factors. This is a reflection of the programme’s relative maturity, its scale, pace and the complex challenges involved in the successful long-term delivery of a 6th generation combat aircraft. As such, a confidence assessment of Red is not unexpected. Significant achievements have been made, having signed a treaty with trilateral Global Combat Air Programme (GCAP) partners Italy and Japan in Dec 2023. Three significant milestones were then achieved in December 2024: the GCAP Convention came into force, the GCAP International Government Organisation was formally established in the UK, and the Joint Venture Agreement for GCAP was trilaterally signed by industry partners. However, the programme remains in the early stages of development, and there is recognition of the scale of the challenges faced to stand up a programme of this nature. Actions are being taken to address this at the start of the programme by learning the lessons of the past and from similarly large and complex projects.","startDate":"2019-04-26","endDate":null,"scheduleNarrative":"Section 22 - Information intended for future publication","fyBaseline":1261.9,"fyForecast":1238.2,"fyVariance":1.88,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Delivery & schedule","Cost & funding","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at RED. This is primarily due to the following factors. This is a reflection of the programme’s relative maturity, its scale, pace and the complex challenges involved in the successful long-term delivery of a 6th generation combat aircraft. As such, a…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Section 22 - Information intended for future publication","narrativeClaimKind":null},{"id":"MOD_0122_2021-Q4","year":2026,"name":"FUTURE COMBAT AIR SYSTEM","department":"MOD","category":"Military Capability","description":"The Future Combat Air System (FCAS) programme will identify the combat air system to replace Typhoon, which will retire from service from the mid-2030s. FCAS will be primarily responsible for delivering Control of the Air, and contribute to Attack and Information, Surveillance and Reconnaissance. Military advantage in Combat Air will require a System of highly adaptable and networked capabilities, that together deliver military effects greater than the sum of the parts. Able to operate inside a multi-domain information environment or in isolation, the system will exploit open mission architectures to allow freedom of modification and rapid technology insertion. The System will be enabled through a combination of core platforms, uncrewed additives and complex weapons with the optimal force mix to be determined during the Concept and Assessment Phase. An international programme by design, the UK is working with several international partners to define the longer-term partnership construct for the Enterprise.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Red. This is primarily due to the following factors. 1. The continued Red rating reflects the programme’s relative maturity, its scale and the complexity involved in meeting the challenges of successful design, delivery and support of a 6th generation fighter jet. The immediate focus is securing the necessary multi-year funding and approval settlements that will allow the Global Combat Air Programme (GCAP) to move to the next phase and see the first international development contract between the GCAP Agency and the tri-national Edgewing Joint Venture signed. 2. Other challenges faced by the programme include the design and delivery of a tri-national secure digital network and Collaborative Working Environment that equally supports novel approaches to digital engineering and digital qualification and certification objectives, whilst ensuring cyber resiliency and intellectual property protections.","startDate":"2019-04-26","endDate":null,"scheduleNarrative":"Exempt under Section 22 - Information intended for future publication","fyBaseline":1466.97,"fyForecast":1398.74,"fyVariance":4.65,"varianceNarrative":"The budget variance is less than 5%.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Technical & integration","Cost & funding","Delivery & schedule","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Red. This is primarily due to the following factors. 1. The continued Red rating reflects the programme’s relative maturity, its scale and the complexity involved in meeting the challenges of successful design, delivery and support of a 6th…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 22 - Information intended for future publication","narrativeClaimKind":null}],"previous":{"id":"MOD_0122_2021-Q4","year":2025,"name":"FUTURE COMBAT AIR SYSTEM","department":"MoD","category":"Military Capability","description":"The Future Combat Air System (FCAS) programme will identify the combat air system to replace Typhoon, which will retire from service from the mid-2030s. FCAS will be primarily responsible for delivering Control of the Air, and contribute to Attack and Information, Surveillance and Reconnaissance. Military advantage in Combat Air will require a system of highly adaptable and networked capabilities, that together deliver military effects greater than the sum of the parts. Able to operate inside a multi-domain information environment or in isolation, the system will exploit open mission architectures to allow freedom of modification and rapid technology insertion. The system will be enabled through a combination of core platforms, uncrewed additives and complex weapons, with the optimal force mix to be determined during the Concept and Assessment Phase. An international programme by design, the UK is working with several international partners to define the longer-term partnership construct for the Enterprise.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at RED. This is primarily due to the following factors. This is a reflection of the programme’s relative maturity, its scale, pace and the complex challenges involved in the successful long-term delivery of a 6th generation combat aircraft. As such, a confidence assessment of Red is not unexpected. Significant achievements have been made, having signed a treaty with trilateral Global Combat Air Programme (GCAP) partners Italy and Japan in Dec 2023. Three significant milestones were then achieved in December 2024: the GCAP Convention came into force, the GCAP International Government Organisation was formally established in the UK, and the Joint Venture Agreement for GCAP was trilaterally signed by industry partners. However, the programme remains in the early stages of development, and there is recognition of the scale of the challenges faced to stand up a programme of this nature. Actions are being taken to address this at the start of the programme by learning the lessons of the past and from similarly large and complex projects.","startDate":"2019-04-26","endDate":null,"scheduleNarrative":"Section 22 - Information intended for future publication","fyBaseline":1261.9,"fyForecast":1238.2,"fyVariance":1.88,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Delivery & schedule","Cost & funding","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at RED. This is primarily due to the following factors. This is a reflection of the programme’s relative maturity, its scale, pace and the complex challenges involved in the successful long-term delivery of a 6th generation combat aircraft. As such, a…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Section 22 - Information intended for future publication","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":null,"attentionScore":35,"attentionReasons":["Current published delivery confidence is Red"]},{"id":"DFT_0040_2021-Q1","year":2026,"name":"HS2 PHASE I","department":"DFT","category":"Infrastructure and Construction","description":"A new high-capacity, high-speed railway connecting London and the West Midlands with onward services to other cities, via the existing West Coast Main Line.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"The NISTA / SRO Delivery Confidence Assessment (DCA) rating remains at RED at 25/26 Q4. This is primarily due to delivery of HS2 being unachievable against Baseline 7.1 (approved at Notice to Proceed in April 2020), as confirmed through correspondence between the HS2 Ltd Chief Executive Officer (CEO) and the Secretary of State in 2025. In response, the Department and HS2 Ltd have progressed a comprehensive reset programme, alongside strengthened governance and delivery controls. Key developments include: • Continuing the HS2 reset under the leadership of CEO Mark Wild and Chair Mike Brown, with Board capability strengthened through new Non-Executive Director appointments. • HS2 Ltd providing assured cost and schedule ranges to the Department, approved by the Ministerial Task Force in January 2026, with further conditions (including the outcome of the Strategic Scope Review) addressed ahead of publication and announcement by the Secretary of State on 19 May 2026. • Commencing development of a new delivery baseline (Baseline 8.0/8.1), supported by a staged review process to ensure robust assurance and programme integration. • Maintaining tight in-year financial and performance controls through the Performance Management Plan (PMP), contributing to improved construction productivity and delivery within annual budgets. • Delivering FY25/26 Phase 1 expenditure and maximising productivity in line with budget (£6.967bn, 0.4% below Supplementary Estimates) and agreeing a £7.1bn funding allocation for FY26/27. • Progressing Euston Programme activities, including definition of an integrated Euston Station Spatial Plan and delivery schedule, the stand-up of the Euston Delivery Company in April 2026, continuation of enabling works and exploration of a private finance delivery model for the HS2 station. Overall, the Department has focused on resetting the programme to establish a credible, deliverable baseline while maintaining cost control, improving productivity, and strengthening governance arrangements.","startDate":"2009-01-14","endDate":null,"scheduleNarrative":"As at 25/26 Q4, the previous delivery into service range of 2029–2033 is unachievable, as confirmed through correspondence between the HS2 Ltd CEO and the Secretary of State in 2025. In response, the Department and HS2 Ltd have progressed a comprehensive reset programme. Key developments include: • The Department has tasked the HS2 Ltd CEO with progressing a comprehensive reset to establish realistic cost and schedule estimates for delivering the remaining scope at the lowest reasonable cost. Assured schedule ranges were provided to the Department in December 2025 and approved by the Ministerial Task Force in January 2026, with further conditions (including the outcome of the Strategic Scope review) addressed ahead of publication and announcement by the Secretary of State on 19 May 2026. • The reset will deliver updated schedule ranges for key service configurations (Old Oak Common–Birmingham, Euston–Birmingham, and Euston–North West) and inform development of a new schedule baseline (Baseline 8.0/8.1). Baseline development commenced in January 2026 and is subject to a progressive integrated review and assurance process. • Whilst the reset is ongoing, the Department continues to manage HS2 Ltd through strengthened in-year controls, including a Performance Management Plan for 2026/27 setting out key milestones, targets and productivity metrics. Enhanced governance and assurance arrangements, aligned to the James Stewart Review, remain in place to support in-year delivery and schedule discipline.","fyBaseline":3489.25,"fyForecast":3489.25,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":null,"costNarrative":"At 25/26 Q4, the departmentally agreed Whole Life Cost (measured in £m) for HS2 is exempted. The Department does not report on Whole Life Cost as it does not reflect the true up-front cost for building HS2. Key developments include: • The Department has tasked the HS2 Ltd CEO with progressing a comprehensive reset to establish realistic cost and schedule estimates for delivering the remaining scope at the lowest reasonable cost. Assured cost ranges were provided to the Department in December 2025 and approved by the Ministerial Task Force in January 2026, with further conditions set ahead of public announcement, including consideration of the Strategic Scope Review. As the Secretary of State publicly announced on 19 May 2026, the expected cost of delivering HS2 is now in the range of £87.7 – £102.7 billion. This is expressed in a mixed price base, including the cash outturn of works to date and the costs of future work excluding inflation. • The HS2 reset is ongoing and work continues to progress on development of a new cost baseline (Baseline 8.0/8.1). Baseline development commenced in January 2026 and is subject to a progressive integrated review and assurance process. • Whilst the reset is ongoing, the Department continues to manage HS2 Ltd through strengthened in-year controls, including a Performance Management Plan for 2026/27 and application of financial controls to support affordability and delivery confidence. • Funding provided through the Spending Review 2025 settlement supports continued delivery between the West Midlands and London Euston, alongside reset activities. Cost control remains focused on improving productivity, strengthening governance, and embedding lessons learned to ensure the programme can be delivered within future agreed budgets.","benefits":null,"benefitsNarrative":"The project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) is exempted. The HS2 programme tracks progress against its benefits baseline through quarterly benefits reporting (QBR). The current reporting on benefits during design and construction is not monetised but uses natural measures to reflect whether the outcomes are achieved. The HS2 programme is currently being reset, and a reset of the programme’s benefits will form part of that programme of work; alongside this, we will update the HS2 business case. In the interim, HS2 Ltd will continue reporting against the existing benefits baseline.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Scope & requirements"],"evidenceExcerpt":"The NISTA / SRO Delivery Confidence Assessment (DCA) rating remains at RED at 25/26 Q4. This is primarily due to delivery of HS2 being unachievable against Baseline 7.1 (approved at Notice to Proceed in April 2020), as confirmed through correspondence between the HS2 Ltd Chief Executive Officer (CEO) and the Secretary of State in 2025. In response, the…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"As at 25/26 Q4, the previous delivery into service range of 2029–2033 is unachievable, as confirmed through correspondence between the HS2 Ltd CEO and the Secretary of State in 2025. In response, the Department and HS2 Ltd have progressed a comprehensive reset programme. Key developments include: • The Department has tasked the HS2 Ltd CEO with progressing a comprehensive reset to establish realistic cost and schedule estimates for delivering the remaining scope at the lowest reasonable cost. Assured schedule ranges were provided to the Department in December 2025 and approved by the Ministerial Task Force in January 2026, with further conditions (including the outcome of the Strategic Scope review) addressed ahead of publication and announcement by the Secretary of State on 19 May 2026. • The reset will deliver updated schedule ranges for key service configurations (Old Oak Common–Birmingham, Euston–Birmingham, and Euston–North West) and inform development of a new schedule baseline (Baseline 8.0/8.1). Baseline development commenced in January 2026 and is subject to a progressive integrated review and assurance process. • Whilst the reset is ongoing, the Department continues to manage HS2 Ltd through strengthened in-year controls, including a Performance Management Plan for 2026/27 setting out key milestones, targets and productivity metrics. Enhanced governance and assurance arrangements, aligned to the James Stewart Review, remain in place to support in-year delivery and schedule discipline.","narrativeClaimKind":null,"history":[{"id":"DFT_0040_2021-Q1","year":2021,"name":"HS2 Phase1","department":"DFT","category":"Infrastructure and Construction","description":"HS2 will form the backbone of the UK's transport network, connecting eight out of ten of Britain's largest cities. By making it easier to move between the North, Midlands and South, cutting many journeys by half, HS2 will make it easier for people to live and work where they want.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber/red.This is primarily due to the following factors: Activity since the last IPA RAG rating includes: - In April 2020, the Government approved the Full Business Case for Phase One and agreed a revised funding regime and governance arrangements to take the programme forward. This permitted Main Works Civils Contractors to begin construction of Phase One. This year's key achievements include: . progressing the remaining enabling works and mobilising main civil construction for Phase One while employing COVID-safe working practices . achieving consolidation point for Old Oak Common station allowing construction to commence . evolving our approach to community engagement, including an enhanced complaints procedure to address concerns about how HS2's impact on communities along the line of route are managed . implementation of over a quarter of the proposed reforms recommended by the Land and Property Review of November 2020 . establishing HS2 Ltd's Environmental Sustainability Committee to limit and mitigate the environmental impacts from the construction of the railway","startDate":"2009-01-14","endDate":"2029-11-30","scheduleNarrative":"The project end-date is 30 November 2029. This is primarily due to the following factors: The target for delivery-into-service of Birmingham Curzon Street to London Old Oak Common remains 2029 to 2033, as set out last year in the Full Business Case. However, as the most recent Parliamentary update on progress stated, some schedule pressures on Phase One have emerged from delays in the period of handover of enabling to main works, including: .issues with completing utilities diversions .postponed land acquisition and access during the first COVID-19 lockdown .slower than planned development of detailed designs by the main works contractors Further cost pressures could emerge if mitigation activity is required to remain on schedule. HS2 Ltd is currently undertaking a schedule mitigation exercise on Phase One, this is due to conclude by Q2 21/22. Work to identify affordable design and delivery arrangements for Euston station is underway.","fyBaseline":3498.0,"fyForecast":3498.0,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":40295.0,"costNarrative":"The projects Baseline Whole Life Cost is �40295.00m. This is primarily due to the following factors: HS2 Ltd continues to report the anticipated final cost at �40.3bn. The total Funding Envelope for Phase 1, including contingency, stands at �44.6bn. As delivery progresses, cost pressures are emerging on the point estimate as risk materialises and these are expected to be managed from within existing contingency delegations. HS2 Ltd continues to assess the impact of COVID on the programme and validated costs incurred will require a draw on Government-held contingency. DfT does not report on the Whole Life Costs of the project as they do not reflect the true up-front capital costs of building the railway.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber/red.This is primarily due to the following factors: Activity since the last IPA RAG rating includes: - In April 2020, the Government approved the Full Business Case for Phase One and agreed a revised funding regime and governance arrangements to take the programme forward.…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project end-date is 30 November 2029. This is primarily due to the following factors: The target for delivery-into-service of Birmingham Curzon Street to London Old Oak Common remains 2029 to 2033, as set out last year in the Full Business Case. However, as the most recent Parliamentary update on progress stated, some schedule pressures on Phase One have emerged from delays in the period of handover of enabling to main works, including: .issues with completing utilities diversions .postponed land acquisition and access during the first COVID-19 lockdown .slower than planned development of detailed designs by the main works contractors Further cost pressures could emerge if mitigation activity is required to remain on schedule. HS2 Ltd is currently undertaking a schedule mitigation exercise on Phase One, this is due to conclude by Q2 21/22. Work to identify affordable design and delivery arrangements for Euston station is underway.","narrativeClaimKind":null},{"id":"DFT_0040_2021-Q1","year":2022,"name":"HS2 Phase 1","department":"DFT","category":"Infrastructure and Construction","description":"HS2 will form the backbone of the UK's transport network, connecting Britain's largest cities. By making it easier to move between the North, Midlands and South, cutting many journeys by half, HS2 will make it easier for people to live and work where they want. Phase One will involve the construction of a new high speed railway line between London and the West Midlands, where it will re-join the existing West Coast Mainline.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 decreased from Amber/red to Amber. Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 improved from Amber/Red to Amber. This is primarily due to the reset of the schedule and positive progress with closing out residual enabling works and mobilising construction activity. The project remains early in delivery with significant risk outstanding given the scale, complexity and duration. The HS2 6-monthly report to Parliament published in March 2022 provides the latest review of High Speed Two (HS2) including programme update (https://www.gov.uk/government/speeches/hs2-6-monthly-report-to-parliament-march-2022).","startDate":"2009-01-14","endDate":"2030-06-30","scheduleNarrative":"Compared to 2021-Q4, your project end-date increased from 30 NOV 2029 to 30 JUN 2030. This is primarily due to the following factors: Compared to financial year 20/21-Q4, the project's end-date at 21/22-Q4 remains reported as 2030. This is the agreed Target Date, within the estimated opening range of 2029-2033. There has been some erosion of schedule float as a result of delays at the front end of the programme impacting on the start/ramp-up in Main Works activity, however HS2 Ltd continues to predict it can deliver to the Target Date.","fyBaseline":5060.1,"fyForecast":5060.1,"fyVariance":0.0,"varianceNarrative":"The current in year budget is £5bn. The current annual spend matches the overall budget allocation.","wholeLifeCost":40295.0,"costNarrative":"Compared to 2021-Q4, the projects Baseline Whole Life Cost remained at 40295.00 (£m). This is primarily due to the following factors: The overall budget for Phase 1 (including Euston) remains at £44.6bn (2019 prices) and the target cost remains at £40.3bn. This is ring-fenced in a multi-year settlement to 24/25 by HMT. At Spending Review 2021, the Department retained the settlement agreed last year, although HS2 Ltd is forecasting some pressure on the Phase 1 budget over this period against the agreed profile. Along with the wider UK economy, HS2 is experiencing high levels of inflation. With inflation showing no signs of abating in the short-medium term, the Department and HS2 Ltd remain focused on working to assess and mitigate the impact of inflationary pressures on the programme.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 decreased from Amber/red to Amber. Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 improved from Amber/Red to Amber. This is primarily due to the reset of…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to 2021-Q4, your project end-date increased from 30 NOV 2029 to 30 JUN 2030. This is primarily due to the following factors: Compared to financial year 20/21-Q4, the project's end-date at 21/22-Q4 remains reported as 2030. This is the agreed Target Date, within the estimated opening range of 2029-2033. There has been some erosion of schedule float as a result of delays at the front end of the programme impacting on the start/ramp-up in Main Works activity, however HS2 Ltd continues to predict it can deliver to the Target Date.","narrativeClaimKind":null},{"id":"DFT_0040_2021-Q1","year":2023,"name":"HS2 Phase 1","department":"DFT","category":"Infrastructure and Construction","description":"A new railway connecting the countrys biggest cities and economic regions enabling rebalancing and regional growth in the Midlands Engine and Northern Powerhouse - through a high capacity, high speed and low carbon transport solution.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 decreased from Amber to Red. This is primarily due to the following factors. The Spring Budget required HS2 to rephase parts of Phase 1 to reduce expenditure over the next two years to help manage overall government expenditure whilst protecting the Old Oak Common to Birmingham Curzon Street section. HS2 Ltd has reported further cost pressures across Phase 1 which are currently being reviewed by HS2 Ltd's Board. Phase 1's delivery targets for cost and schedule will need to be amended to address these changes and to address excess inflation given costs continue to be measured in 2019 values.","startDate":"2009-01-14","endDate":null,"scheduleNarrative":"Old Oak Common to Birmingham Curzon Street remains on track to deliver initial services between 2029 and 2033. Works continue to be progressed north of Birmingham but may need to be slowed if necessary to protect initial services. Work south of Old Oak Common including Euston has been paused and a revised schedule depends on when funding is reinstated.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"The current forecast is within 5 per cent of budget.","wholeLifeCost":null,"costNarrative":"WLC does not reflect the true up-front cost for HS2 so is not reported by DfT. The Target Cost for Phase One is 40.3bn, and the overall budget including Euston is 44.6bn. The HS2 budget is in 2019 terms and needs to be rebased to adjust for inflation. HS2 is experiencing high inflation, and HS2L has reported cost pressures, with its estimate at completion under review.On 9 March DfT committed to the delivery of HS2 between Old Oak Common and Birmingham Curzon Street but delayed other parts of Phase 1. DfT and HS2 Ltd are rescheduling delivery and reprofiling costs to protect vfm, but prolongation and delay costs have not been assessed, and will depend on when funding is available.DfT is committed to delivering services to Euston, and is working with HS2L on affordability to protect vfm, this includes investing in more mature designs and cost-effective delivery approaches.","benefits":32850.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 32850m. The HS2 Programme tracks progress against its benefits baseline through quarterly reporting. This reporting is not monetised but uses natural measures to reflect whether the outcomes are being achieved. It continues to RAG rate Green overall in terms of the benefits being reported during design and construction. The work to reschedule delivery and reprofile costs will be reflected in revised benefits baselines. It is anticipated that benefits will be delayed rather than forfeited.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 decreased from Amber to Red. This is primarily due to the following factors. The Spring Budget required HS2 to rephase parts of Phase 1 to reduce expenditure over the next two years to help manage overall government expenditure…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Old Oak Common to Birmingham Curzon Street remains on track to deliver initial services between 2029 and 2033. Works continue to be progressed north of Birmingham but may need to be slowed if necessary to protect initial services. Work south of Old Oak Common including Euston has been paused and a revised schedule depends on when funding is reinstated.","narrativeClaimKind":null},{"id":"DFT_0040_2021-Q1","year":2024,"name":"HS2 Phase 1","department":"DFT","category":"Infrastructure and Construction","description":"A new high-capacity, high-speed railway connecting London and the West Midlands with onward services to other cities, via the existing West Coast Main Line.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Red. This is primarily due to the following factors. HS2 Ltd has been asked to update its cost estimate to consider the revised scope of Phase 1 and the cancellation of the wider scheme reflecting reduced scope and the costs of any changes. The Department and HS2 Ltd continue to work collaboratively to develop a joint plan setting out an enhanced approach to governance and controls on the project, alongside planned internal changes to accountabilities and leadership structures within HS2 Ltd. Parliament will be updated once a revised cost estimate has been agreed and new targets provided to HS2 Ltd._x000D_ _x000D_ Work has also commenced on an updated Business Case for the revised programme, following the Network North announcement. This will be published in due course and provide an economic assessment following decisions being made on the HS2 train services running to and from Euston.","startDate":"2009-01-14","endDate":null,"scheduleNarrative":"The project's end-date at 23/24-Q4 is ARMP adjustments - Project not yet in a position to give cost/schedule. This is primarily due to the following factors. The forecast date for initial HS2 services between Birmingham Curzon Street and Old Oak Common remains within the range of 2029 to 2033._x000D_ _x000D_ An updated delivery-into-service range for services to Euston will be provided in due course.","fyBaseline":5118.3,"fyForecast":5118.3,"fyVariance":0.0,"varianceNarrative":"The budget variance is inferior or equal to 5%.","wholeLifeCost":null,"costNarrative":"The project's departmental-agree Whole Life Cost at 23/24-Q4 is ARMP adjustments - Project not yet in a position to give cost/schedulem. This is primarily due to the following factors. The Department does not report on Whole Life Cost (WLC) as it does not reflect the true up-front cost for building HS2. Work on managing cost pressures continues, and HS2 Ltd has undertaken a review of Phase 1's estimate at completion (EAC), advising that the updated EAC for the Phase 1 is 49 billion to 57 billion (2019 prices). However, the Department considers that the outturn cost of Phase 1 (pre-Network North changes) should lie between 45 billion and 54 billion and has been clear that HS2 Ltd should deliver at the lower end of this range even if that entails difficult choices. The Department has now also instructed HS2 Ltd to update its EAC to consider the revised scope of Phase 1 in light of the Network North announcement. Parliament will be updated on a new cost range once the revised EAC has been agreed","benefits":null,"benefitsNarrative":"NA The HS2 programme tracks progress against its benefits baseline through quarterly benefits reporting (QBR). This reporting is not monetised but uses natural measures to reflect whether the outcomes are being achieved. For benefits being reported on during design and construction the performance RAG rating for the QBR for 2023/24 Q4 is green overall. Following the Network North announcement, work on the re-baselining of benefits is ongoing as part of the programme reset.","themes":["Cost & funding","Delivery & schedule","Scope & requirements","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Red. This is primarily due to the following factors. HS2 Ltd has been asked to update its cost estimate to consider the revised scope of Phase 1 and the cancellation of the wider scheme reflecting reduced scope and the…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 23/24-Q4 is ARMP adjustments - Project not yet in a position to give cost/schedule. This is primarily due to the following factors. The forecast date for initial HS2 services between Birmingham Curzon Street and Old Oak Common remains within the range of 2029 to 2033._x000D_ _x000D_ An updated delivery-into-service range for services to Euston will be provided in due course.","narrativeClaimKind":null},{"id":"DFT_0040_2021-Q1","year":2025,"name":"HS2 PHASE I","department":"DfT","category":"Infrastructure and Construction","description":"A new high-capacity, high-speed railway connecting London and the West Midlands with onward services to other cities, via the existing West Coast Main Line.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at RED. This is primarily due to the following factors‚ Since the beginning of 2024, HS2 Ltd has been in Performance Default due to forecasts irrecoverably exceeding the Funding Envelope (£44.6bn - 2019 prices) as well as expressing risks to the delivery into service (DiS) schedule range of 2029 to 2033. The Department has made significant progress in delivering the package of measures announced by the Secretary of State, including: • Reinstating the Ministerial Task Force ensuring greater ministerial oversight and accountability on HS2 Ltd. • Writing to the CEO of HS2 Ltd making it clear that after safety, the primary objective is to deliver the remaining scope at the lowest reasonable cost to the taxpayer, and requesting an initial assessment on the current position of HS2 and his plans for reset. • Starting the reset of HS2. The Department and HS2 Ltd have created a joint single programme and established task forces to oversee various elements of reset with a view to establishing a new and robust baseline in 2026. The reset programme will embed the recommendations from the independent review of major transport projects led by James Stewart. • Working collaboratively with HS2 Ltd to agree a ‘Bridging Protocol’ for the transition period until a new Baseline has been agreed. These interim arrangements provide the Department a greater level of transparency and control of HS2 Ltd expenditure whilst the programme undergoes reset.","startDate":"2009-01-14","endDate":null,"scheduleNarrative":"The project's end-date at 24/25-Q4 is scheduled to be 30/06/2030. This is primarily due to the following factors‚ Since the beginning of 2024, HS2 Ltd has been in Performance Default due to forecasts irrecoverably exceeding the Funding Envelope (£44.6bn - 2019 prices) whilst also expressing several schedule risks to the delivery into service range of 2029 to 2033. DfT has tasked the CEO of HS2 Ltd with undertaking a comprehensive reset of the programme to recommend revised cost and schedule estimates and deliver the remaining work at the lowest reasonable cost. This work will continue over the coming months and the Government will report on progress. The reset will deliver revised ranges for cost and schedule, informed by an agreed method for cost estimation and the recommendations from the independent Major Transport Projects Governance and Assurance Review led by James Stewart. Whilst the reset is ongoing, the Department will manage HS2 Ltd to tighter in-year controls, including targets and metrics to deliver within an annual funding settlement.","fyBaseline":4488.4,"fyForecast":4488.4,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":null,"costNarrative":"The project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) is exempted. This is primarily due to the following factors‚ The Department does not report on Whole Life Cost (WLC) as it does not reflect the true up-front cost for building HS2. DfT has tasked the CEO of HS2 Ltd with undertaking a comprehensive reset of the programme to recommend revised cost and schedule estimates and deliver the remaining work at the lowest reasonable cost. It is important to get this right, which is why the reset will take time and involve close working between HS2 Ltd, the Department and the rest of government. Until the reset of the programme concludes, the Department does not have an agreed estimate of how much the project will cost.","benefits":null,"benefitsNarrative":"The project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) is exempted. This is primarily due to the following factors‚ The HS2 programme tracks progress against its benefits baseline through quarterly benefits reporting (QBR). The current reporting on benefits during design and construction is not monetised but uses natural measures to reflect whether the outcomes are achieved. The HS2 programme is currently being reset, and a reset of the benefits will form part of that work; alongside this, we will update the HS2 business case. In the interim, HS2 Ltd will continue reporting against the existing benefits baseline.","themes":["Cost & funding","Scope & requirements","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at RED. This is primarily due to the following factors‚ Since the beginning of 2024, HS2 Ltd has been in Performance Default due to forecasts irrecoverably exceeding the Funding Envelope (£44.6bn - 2019 prices) as well as…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 24/25-Q4 is scheduled to be 30/06/2030. This is primarily due to the following factors‚ Since the beginning of 2024, HS2 Ltd has been in Performance Default due to forecasts irrecoverably exceeding the Funding Envelope (£44.6bn - 2019 prices) whilst also expressing several schedule risks to the delivery into service range of 2029 to 2033. DfT has tasked the CEO of HS2 Ltd with undertaking a comprehensive reset of the programme to recommend revised cost and schedule estimates and deliver the remaining work at the lowest reasonable cost. This work will continue over the coming months and the Government will report on progress. The reset will deliver revised ranges for cost and schedule, informed by an agreed method for cost estimation and the recommendations from the independent Major Transport Projects Governance and Assurance Review led by James Stewart. Whilst the reset is ongoing, the Department will manage HS2 Ltd to tighter in-year controls, including targets and metrics to deliver within an annual funding settlement.","narrativeClaimKind":null},{"id":"DFT_0040_2021-Q1","year":2026,"name":"HS2 PHASE I","department":"DFT","category":"Infrastructure and Construction","description":"A new high-capacity, high-speed railway connecting London and the West Midlands with onward services to other cities, via the existing West Coast Main Line.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"The NISTA / SRO Delivery Confidence Assessment (DCA) rating remains at RED at 25/26 Q4. This is primarily due to delivery of HS2 being unachievable against Baseline 7.1 (approved at Notice to Proceed in April 2020), as confirmed through correspondence between the HS2 Ltd Chief Executive Officer (CEO) and the Secretary of State in 2025. In response, the Department and HS2 Ltd have progressed a comprehensive reset programme, alongside strengthened governance and delivery controls. Key developments include: • Continuing the HS2 reset under the leadership of CEO Mark Wild and Chair Mike Brown, with Board capability strengthened through new Non-Executive Director appointments. • HS2 Ltd providing assured cost and schedule ranges to the Department, approved by the Ministerial Task Force in January 2026, with further conditions (including the outcome of the Strategic Scope Review) addressed ahead of publication and announcement by the Secretary of State on 19 May 2026. • Commencing development of a new delivery baseline (Baseline 8.0/8.1), supported by a staged review process to ensure robust assurance and programme integration. • Maintaining tight in-year financial and performance controls through the Performance Management Plan (PMP), contributing to improved construction productivity and delivery within annual budgets. • Delivering FY25/26 Phase 1 expenditure and maximising productivity in line with budget (£6.967bn, 0.4% below Supplementary Estimates) and agreeing a £7.1bn funding allocation for FY26/27. • Progressing Euston Programme activities, including definition of an integrated Euston Station Spatial Plan and delivery schedule, the stand-up of the Euston Delivery Company in April 2026, continuation of enabling works and exploration of a private finance delivery model for the HS2 station. Overall, the Department has focused on resetting the programme to establish a credible, deliverable baseline while maintaining cost control, improving productivity, and strengthening governance arrangements.","startDate":"2009-01-14","endDate":null,"scheduleNarrative":"As at 25/26 Q4, the previous delivery into service range of 2029–2033 is unachievable, as confirmed through correspondence between the HS2 Ltd CEO and the Secretary of State in 2025. In response, the Department and HS2 Ltd have progressed a comprehensive reset programme. Key developments include: • The Department has tasked the HS2 Ltd CEO with progressing a comprehensive reset to establish realistic cost and schedule estimates for delivering the remaining scope at the lowest reasonable cost. Assured schedule ranges were provided to the Department in December 2025 and approved by the Ministerial Task Force in January 2026, with further conditions (including the outcome of the Strategic Scope review) addressed ahead of publication and announcement by the Secretary of State on 19 May 2026. • The reset will deliver updated schedule ranges for key service configurations (Old Oak Common–Birmingham, Euston–Birmingham, and Euston–North West) and inform development of a new schedule baseline (Baseline 8.0/8.1). Baseline development commenced in January 2026 and is subject to a progressive integrated review and assurance process. • Whilst the reset is ongoing, the Department continues to manage HS2 Ltd through strengthened in-year controls, including a Performance Management Plan for 2026/27 setting out key milestones, targets and productivity metrics. Enhanced governance and assurance arrangements, aligned to the James Stewart Review, remain in place to support in-year delivery and schedule discipline.","fyBaseline":3489.25,"fyForecast":3489.25,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":null,"costNarrative":"At 25/26 Q4, the departmentally agreed Whole Life Cost (measured in £m) for HS2 is exempted. The Department does not report on Whole Life Cost as it does not reflect the true up-front cost for building HS2. Key developments include: • The Department has tasked the HS2 Ltd CEO with progressing a comprehensive reset to establish realistic cost and schedule estimates for delivering the remaining scope at the lowest reasonable cost. Assured cost ranges were provided to the Department in December 2025 and approved by the Ministerial Task Force in January 2026, with further conditions set ahead of public announcement, including consideration of the Strategic Scope Review. As the Secretary of State publicly announced on 19 May 2026, the expected cost of delivering HS2 is now in the range of £87.7 – £102.7 billion. This is expressed in a mixed price base, including the cash outturn of works to date and the costs of future work excluding inflation. • The HS2 reset is ongoing and work continues to progress on development of a new cost baseline (Baseline 8.0/8.1). Baseline development commenced in January 2026 and is subject to a progressive integrated review and assurance process. • Whilst the reset is ongoing, the Department continues to manage HS2 Ltd through strengthened in-year controls, including a Performance Management Plan for 2026/27 and application of financial controls to support affordability and delivery confidence. • Funding provided through the Spending Review 2025 settlement supports continued delivery between the West Midlands and London Euston, alongside reset activities. Cost control remains focused on improving productivity, strengthening governance, and embedding lessons learned to ensure the programme can be delivered within future agreed budgets.","benefits":null,"benefitsNarrative":"The project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) is exempted. The HS2 programme tracks progress against its benefits baseline through quarterly benefits reporting (QBR). The current reporting on benefits during design and construction is not monetised but uses natural measures to reflect whether the outcomes are achieved. The HS2 programme is currently being reset, and a reset of the programme’s benefits will form part of that programme of work; alongside this, we will update the HS2 business case. In the interim, HS2 Ltd will continue reporting against the existing benefits baseline.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Scope & requirements"],"evidenceExcerpt":"The NISTA / SRO Delivery Confidence Assessment (DCA) rating remains at RED at 25/26 Q4. This is primarily due to delivery of HS2 being unachievable against Baseline 7.1 (approved at Notice to Proceed in April 2020), as confirmed through correspondence between the HS2 Ltd Chief Executive Officer (CEO) and the Secretary of State in 2025. In response, the…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"As at 25/26 Q4, the previous delivery into service range of 2029–2033 is unachievable, as confirmed through correspondence between the HS2 Ltd CEO and the Secretary of State in 2025. In response, the Department and HS2 Ltd have progressed a comprehensive reset programme. Key developments include: • The Department has tasked the HS2 Ltd CEO with progressing a comprehensive reset to establish realistic cost and schedule estimates for delivering the remaining scope at the lowest reasonable cost. Assured schedule ranges were provided to the Department in December 2025 and approved by the Ministerial Task Force in January 2026, with further conditions (including the outcome of the Strategic Scope review) addressed ahead of publication and announcement by the Secretary of State on 19 May 2026. • The reset will deliver updated schedule ranges for key service configurations (Old Oak Common–Birmingham, Euston–Birmingham, and Euston–North West) and inform development of a new schedule baseline (Baseline 8.0/8.1). Baseline development commenced in January 2026 and is subject to a progressive integrated review and assurance process. • Whilst the reset is ongoing, the Department continues to manage HS2 Ltd through strengthened in-year controls, including a Performance Management Plan for 2026/27 setting out key milestones, targets and productivity metrics. Enhanced governance and assurance arrangements, aligned to the James Stewart Review, remain in place to support in-year delivery and schedule discipline.","narrativeClaimKind":null}],"previous":{"id":"DFT_0040_2021-Q1","year":2025,"name":"HS2 PHASE I","department":"DfT","category":"Infrastructure and Construction","description":"A new high-capacity, high-speed railway connecting London and the West Midlands with onward services to other cities, via the existing West Coast Main Line.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at RED. This is primarily due to the following factors‚ Since the beginning of 2024, HS2 Ltd has been in Performance Default due to forecasts irrecoverably exceeding the Funding Envelope (£44.6bn - 2019 prices) as well as expressing risks to the delivery into service (DiS) schedule range of 2029 to 2033. The Department has made significant progress in delivering the package of measures announced by the Secretary of State, including: • Reinstating the Ministerial Task Force ensuring greater ministerial oversight and accountability on HS2 Ltd. • Writing to the CEO of HS2 Ltd making it clear that after safety, the primary objective is to deliver the remaining scope at the lowest reasonable cost to the taxpayer, and requesting an initial assessment on the current position of HS2 and his plans for reset. • Starting the reset of HS2. The Department and HS2 Ltd have created a joint single programme and established task forces to oversee various elements of reset with a view to establishing a new and robust baseline in 2026. The reset programme will embed the recommendations from the independent review of major transport projects led by James Stewart. • Working collaboratively with HS2 Ltd to agree a ‘Bridging Protocol’ for the transition period until a new Baseline has been agreed. These interim arrangements provide the Department a greater level of transparency and control of HS2 Ltd expenditure whilst the programme undergoes reset.","startDate":"2009-01-14","endDate":null,"scheduleNarrative":"The project's end-date at 24/25-Q4 is scheduled to be 30/06/2030. This is primarily due to the following factors‚ Since the beginning of 2024, HS2 Ltd has been in Performance Default due to forecasts irrecoverably exceeding the Funding Envelope (£44.6bn - 2019 prices) whilst also expressing several schedule risks to the delivery into service range of 2029 to 2033. DfT has tasked the CEO of HS2 Ltd with undertaking a comprehensive reset of the programme to recommend revised cost and schedule estimates and deliver the remaining work at the lowest reasonable cost. This work will continue over the coming months and the Government will report on progress. The reset will deliver revised ranges for cost and schedule, informed by an agreed method for cost estimation and the recommendations from the independent Major Transport Projects Governance and Assurance Review led by James Stewart. Whilst the reset is ongoing, the Department will manage HS2 Ltd to tighter in-year controls, including targets and metrics to deliver within an annual funding settlement.","fyBaseline":4488.4,"fyForecast":4488.4,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":null,"costNarrative":"The project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) is exempted. This is primarily due to the following factors‚ The Department does not report on Whole Life Cost (WLC) as it does not reflect the true up-front cost for building HS2. DfT has tasked the CEO of HS2 Ltd with undertaking a comprehensive reset of the programme to recommend revised cost and schedule estimates and deliver the remaining work at the lowest reasonable cost. It is important to get this right, which is why the reset will take time and involve close working between HS2 Ltd, the Department and the rest of government. Until the reset of the programme concludes, the Department does not have an agreed estimate of how much the project will cost.","benefits":null,"benefitsNarrative":"The project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) is exempted. This is primarily due to the following factors‚ The HS2 programme tracks progress against its benefits baseline through quarterly benefits reporting (QBR). The current reporting on benefits during design and construction is not monetised but uses natural measures to reflect whether the outcomes are achieved. The HS2 programme is currently being reset, and a reset of the benefits will form part of that work; alongside this, we will update the HS2 business case. In the interim, HS2 Ltd will continue reporting against the existing benefits baseline.","themes":["Cost & funding","Scope & requirements","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at RED. This is primarily due to the following factors‚ Since the beginning of 2024, HS2 Ltd has been in Performance Default due to forecasts irrecoverably exceeding the Funding Envelope (£44.6bn - 2019 prices) as well as…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 24/25-Q4 is scheduled to be 30/06/2030. This is primarily due to the following factors‚ Since the beginning of 2024, HS2 Ltd has been in Performance Default due to forecasts irrecoverably exceeding the Funding Envelope (£44.6bn - 2019 prices) whilst also expressing several schedule risks to the delivery into service range of 2029 to 2033. DfT has tasked the CEO of HS2 Ltd with undertaking a comprehensive reset of the programme to recommend revised cost and schedule estimates and deliver the remaining work at the lowest reasonable cost. This work will continue over the coming months and the Government will report on progress. The reset will deliver revised ranges for cost and schedule, informed by an agreed method for cost estimation and the recommendations from the independent Major Transport Projects Governance and Assurance Review led by James Stewart. Whilst the reset is ongoing, the Department will manage HS2 Ltd to tighter in-year controls, including targets and metrics to deliver within an annual funding settlement.","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":null,"attentionScore":35,"attentionReasons":["Current published delivery confidence is Red"]},{"id":"DESNZ_0397_2425-Q2","year":2026,"name":"Hydrogen Allocation Round 2 (HAR2)","department":"DESNZ","category":"Infrastructure and Construction","description":"The second hydrogen allocation round 2 (HAR2) is a competitive allocation round designed to provide long term revenue support via the Hydrogen Production Business Model to hydrogen production projects. In alignment with HAR1, HAR2 aims to unlock private investment, accelerate early hydrogen deployment and support the growth of hydrogen supply chains, whilst contributing to long term decarbonisation and energy system resilience. The Hydrogen Production Business Model (HPBM) is designed to provide revenue support to low carbon hydrogen producers once their project is operational, helping them to overcome the operating cost gap between low carbon hydrogen and high carbon fossil fuels. HAR2 contract allocation is pending, with 27 projects shortlisted and the due diligence phase now complete. The round aims to significantly scale up the UK’s green economy, with successful projects expected to be operational in the coming years.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"There is no comparison to financial year 24/25 Q4 as this project was added to GMPP in financial year 25/26 Q3. Compared to the previous quarter, the delivery confidence rating remains at Red as the project has not currently progressed to the 'Invite to Offer' (ITO) stage. This is primarily due to delays in OBC Approval (from September 2025) and subsequent delays to the commencement of the ITO and Negotiations phase. Ongoing delays will impact on our ability to deliver HAR2 contract awards within the timelines set out in the HAR2 published guidance","startDate":"2023-12-14","endDate":"2041-12-31","scheduleNarrative":"There is no comparison to financial year 24/25 Q4 as this project was added to GMPP in financial year 25/26 Q3. Compared to Q3, the end date remains the same. This is primarily due to the following factors: If we can sign contracts with projects by -financial year 26/27 Q3, the HAR2 end date of 31/12/2041 would still apply. However, we are unable to produce meaningful baseline and forecast dates until we have clarity on ITO start and therefore the HAR2 end date may be subject to change.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"There is no variance in the budget.","wholeLifeCost":9427.02,"costNarrative":"WLC are £9427.02m in Real Prices 24/25 as calculated by NISTA based on £9061m (DESNZ Nominal Pricing)","benefits":5626.77,"benefitsNarrative":"Benefits are £5626.77m in Real Prices 24/25 as calculated by NISTA based on £5408m (DESNZ Real Prices Calendar Year 2023)","themes":["Cost & funding","Approvals & decisions","Commercial & supply chain","Delivery & schedule"],"evidenceExcerpt":"There is no comparison to financial year 24/25 Q4 as this project was added to GMPP in financial year 25/26 Q3. Compared to the previous quarter, the delivery confidence rating remains at Red as the project has not currently progressed to the 'Invite to Offer' (ITO) stage. This is primarily due to delays in OBC Approval (from September 2025) and subsequent…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"There is no comparison to financial year 24/25 Q4 as this project was added to GMPP in financial year 25/26 Q3. Compared to Q3, the end date remains the same. This is primarily due to the following factors: If we can sign contracts with projects by -financial year 26/27 Q3, the HAR2 end date of 31/12/2041 would still apply. However, we are unable to produce meaningful baseline and forecast dates until we have clarity on ITO start and therefore the HAR2 end date may be subject to change.","narrativeClaimKind":null,"history":[{"id":"DESNZ_0397_2425-Q2","year":2026,"name":"Hydrogen Allocation Round 2 (HAR2)","department":"DESNZ","category":"Infrastructure and Construction","description":"The second hydrogen allocation round 2 (HAR2) is a competitive allocation round designed to provide long term revenue support via the Hydrogen Production Business Model to hydrogen production projects. In alignment with HAR1, HAR2 aims to unlock private investment, accelerate early hydrogen deployment and support the growth of hydrogen supply chains, whilst contributing to long term decarbonisation and energy system resilience. The Hydrogen Production Business Model (HPBM) is designed to provide revenue support to low carbon hydrogen producers once their project is operational, helping them to overcome the operating cost gap between low carbon hydrogen and high carbon fossil fuels. HAR2 contract allocation is pending, with 27 projects shortlisted and the due diligence phase now complete. The round aims to significantly scale up the UK’s green economy, with successful projects expected to be operational in the coming years.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"There is no comparison to financial year 24/25 Q4 as this project was added to GMPP in financial year 25/26 Q3. Compared to the previous quarter, the delivery confidence rating remains at Red as the project has not currently progressed to the 'Invite to Offer' (ITO) stage. This is primarily due to delays in OBC Approval (from September 2025) and subsequent delays to the commencement of the ITO and Negotiations phase. Ongoing delays will impact on our ability to deliver HAR2 contract awards within the timelines set out in the HAR2 published guidance","startDate":"2023-12-14","endDate":"2041-12-31","scheduleNarrative":"There is no comparison to financial year 24/25 Q4 as this project was added to GMPP in financial year 25/26 Q3. Compared to Q3, the end date remains the same. This is primarily due to the following factors: If we can sign contracts with projects by -financial year 26/27 Q3, the HAR2 end date of 31/12/2041 would still apply. However, we are unable to produce meaningful baseline and forecast dates until we have clarity on ITO start and therefore the HAR2 end date may be subject to change.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"There is no variance in the budget.","wholeLifeCost":9427.02,"costNarrative":"WLC are £9427.02m in Real Prices 24/25 as calculated by NISTA based on £9061m (DESNZ Nominal Pricing)","benefits":5626.77,"benefitsNarrative":"Benefits are £5626.77m in Real Prices 24/25 as calculated by NISTA based on £5408m (DESNZ Real Prices Calendar Year 2023)","themes":["Cost & funding","Approvals & decisions","Commercial & supply chain","Delivery & schedule"],"evidenceExcerpt":"There is no comparison to financial year 24/25 Q4 as this project was added to GMPP in financial year 25/26 Q3. Compared to the previous quarter, the delivery confidence rating remains at Red as the project has not currently progressed to the 'Invite to Offer' (ITO) stage. This is primarily due to delays in OBC Approval (from September 2025) and subsequent…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"There is no comparison to financial year 24/25 Q4 as this project was added to GMPP in financial year 25/26 Q3. Compared to Q3, the end date remains the same. This is primarily due to the following factors: If we can sign contracts with projects by -financial year 26/27 Q3, the HAR2 end date of 31/12/2041 would still apply. However, we are unable to produce meaningful baseline and forecast dates until we have clarity on ITO start and therefore the HAR2 end date may be subject to change.","narrativeClaimKind":null}],"previous":null,"ratingDelta":null,"transition":"Not comparable","endDateDeltaDays":null,"attentionScore":35,"attentionReasons":["Current published delivery confidence is Red"]},{"id":"MOD_0109_1617-Q2","year":2026,"name":"NEW STYLE OF INFORMATION TECHNOLOGY DEPLOYED","department":"MOD","category":"Information and Communications Technology (ICT)","description":"The Programme aims to deliver a MOD-owned, highly secure, technologically advanced and evolutionary communications and information service that connects war-fighters and enables information advantage across the operational landscape. It will provide operational commanders in the Maritime and Land environments with a modern enduring mission configurable command and control IT system that will deliver the operational services that they require at OFFICIAL, SECRET and Mission SECRET classifications. The in-house delivery of this new system known as OpNET will replace multiple deployable IT systems and will allow the MOD to extract itself from expensive monolithic support contracts.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Red. This is primarily due to the following factors. 1. The programme is currently operating 12 months behind schedule in delivering capability to the Maritime and Land sectors. 2. The delays stem from overly optimistic planning assumptions, ongoing resource and funding constraints, all of which have contributed to increased costs. 3. Delivery to the Land environment is now largely complete, with transition from legacy systems to OpNET expected by end of May 2026. 4. Maritime delivery has gained momentum, however, installation timelines remain constrained by vessel availability. 5. The programme is currently being reset with a reduced scope to ensure it can deliver within budget.","startDate":"2015-04-01","endDate":"2029-03-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the programmes end-date at 25/26-Q4 increased from 31/03/2029 to 30/04/2030. This is primarily due to the following factors. 1. Delays in delivery and the availability of Navy platforms for OpNET to be installed.","fyBaseline":114.02,"fyForecast":111.26,"fyVariance":2.42,"varianceNarrative":"The budget variance is less than or equal to 5%","wholeLifeCost":1598.79,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) remained at £1399M.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmental-agreed monetised benefits at 25/26-Q4 remained at 0m","themes":["Cost & funding","Delivery & schedule","Scope & requirements","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Red. This is primarily due to the following factors. 1. The programme is currently operating 12 months behind schedule in delivering capability to the Maritime and Land sectors. 2. The delays stem from overly optimistic planning…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the programmes end-date at 25/26-Q4 increased from 31/03/2029 to 30/04/2030. This is primarily due to the following factors. 1. Delays in delivery and the availability of Navy platforms for OpNET to be installed.","narrativeClaimKind":null,"history":[{"id":"MOD_0109_1617-Q2","year":2020,"name":"New Style of Information Technology Deployed","department":"MOD","category":"Military Capability","description":"The provision of an IT system which will deliver operational information service to Land, Air, Maritime and Joint users in all physical environments.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Exempt under Section 26 of Freedom of Information Act 2000 (Defence)","startDate":"2015-04-01","endDate":"2025-03-25","scheduleNarrative":"Exempt under Section 26 of Freedom of Information Act 2000 (Defence)","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests)","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests)","benefits":null,"benefitsNarrative":"","themes":["Commercial & supply chain"],"evidenceExcerpt":"Exempt under Section 26 of Freedom of Information Act 2000 (Defence) Exempt under Section 26 of Freedom of Information Act 2000 (Defence)","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2020","sourceLabel":"IPA Annual Report 2019-20","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 26 of Freedom of Information Act 2000 (Defence)","narrativeClaimKind":null},{"id":"MOD_0109_1617-Q2","year":2021,"name":"New Style of Information Technology Deployed","department":"MOD","category":"Military Capability","description":"Exempt under Section 24 of the Freedom of Information Act 2000 (National security)","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 26 of the Freedom of Information Act 2000 (Defence)","startDate":"2015-04-01","endDate":"2025-03-25","scheduleNarrative":"Exempt under Section 26 of the Freedom of Information Act 2000 (Defence)","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under section 22 of the Freedom of information act 2000 (Information intended for future publication)","wholeLifeCost":null,"costNarrative":"Exempt under Section 24 of the Freedom of Information Act 2000 (National security)","benefits":null,"benefitsNarrative":"","themes":[],"evidenceExcerpt":"Exempt under Section 26 of the Freedom of Information Act 2000 (Defence) Exempt under Section 26 of the Freedom of Information Act 2000 (Defence)","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 26 of the Freedom of Information Act 2000 (Defence)","narrativeClaimKind":null},{"id":"MOD_0109_1617-Q2","year":2022,"name":"New Style of Information Technology Deployed","department":"MOD","category":"Military Capability","description":"Exempt under Section 26 of Freedom of Information Act 2000 (Defence).","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 26 of Freedom of Information Act 2000 (Defence).","startDate":null,"endDate":null,"scheduleNarrative":"Exempt under Section 26 of Freedom of Information Act 2000 (Defence).","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 26 of Freedom of Information Act 2000 (Defence).","wholeLifeCost":null,"costNarrative":"Exempt under Section 26 of Freedom of Information Act 2000 (Defence).","benefits":null,"benefitsNarrative":"","themes":[],"evidenceExcerpt":"Exempt under Section 26 of Freedom of Information Act 2000 (Defence). Exempt under Section 26 of Freedom of Information Act 2000 (Defence).","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 26 of Freedom of Information Act 2000 (Defence).","narrativeClaimKind":null},{"id":"MOD_0109_1617-Q2","year":2023,"name":"New Style of Information Technology Deployed","department":"MOD","category":"Military Capability","description":"The Programme aims to deliver an MOD-owned; highly secure; technologically advanced and evolutionary communications and information service that connects war-fighters and enables information advantage across the operational landscape.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 is Amber. This is primarily due to the following factors. Since the 2022 Q4 report the Programme has faced challenges with delivery in both the Land and Maritime environments, due to multiple factors and revised planning is in place and approval is being sought.","startDate":"2015-04-01","endDate":"2028-03-31","scheduleNarrative":"The project's end-date at 22/23-Q4 is 2028-03-31. This is primarily due to the following factors. NA","fyBaseline":117.25,"fyForecast":105.79,"fyVariance":-10.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors: Unspent risk inside costing, deferral's primarily due to supply chain issues, efficiencies mainly against material purchases. These reductions have been offset in part by the inclusion of an in year Capital Defence Expenditure Limit charge; net in year increase relates to an International Financial Reporting Standard 16 accounting payment that has been paid in year.","wholeLifeCost":835.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 22/23-Q4 is 835m. This is primarily due to the following factors. Whole Life Costs have reduced by 4.3M. The key factors are in year unspent risk inside costing, efficiencies mainly against material purchases, changed costing and further deferred costings.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This programme does not report cashable benefits. Its aim is to provision the armed forces with the equipment and / or infrastructure required.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 is Amber. This is primarily due to the following factors. Since the 2022 Q4 report the Programme has faced challenges with delivery in both the Land and Maritime environments, due to multiple factors and revised planning is in place and approval is being sought. The project's…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 22/23-Q4 is 2028-03-31. This is primarily due to the following factors. NA","narrativeClaimKind":null},{"id":"MOD_0109_1617-Q2","year":2024,"name":"New Style of Information Technology Deployed","department":"MOD","category":"Military Capability","description":"The Programme aims to deliver an MOD-owned; highly secure; technologically advanced and evolutionary communications and information service that connects war-fighters and enables information advantage across the operational landscape. It will provide operational commanders in the Maritime and Land environments with a modern; enduring mission configurable command and control IT system that will deliver the operational services that they require at OFFICIAL; SECRET and Mission SECRET classifications. The in-house delivery of this new system; known as OpNET; will replace multiple deployable IT systems and will allow the MOD to extract itself from expensive; monolithic support contracts.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. Delivery to the Maritime Environment remains complex and is regularly impacted by changes to platform availability. There are also ongoing concerns relating to resourcing in the face of centrally driven reductions in headcount.","startDate":"2015-04-01","endDate":"2029-03-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 increased from 2028-03-31 to 2029-03-31. This is primarily due to the following factors. Project End Date adjusted to align with Full Business Case 3 which was approved in December 2023. Full Operating Capability is now forecast to be declared in April 2030 primarily due to ship availability beyond the current approval caused by changes in operational deployments.Â","fyBaseline":113.69,"fyForecast":93.61,"fyVariance":-17.662,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The key factors are in year unspent risk inside costing, efficiencies mainly against material purchases, changed costing and further deferred costings. Further increases in the following year will be dependant on funding uplifts for deferred measures.","wholeLifeCost":1397.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 increased from 835m. to 1397m. This is primarily due to the following factors. Approval of Full Business Case 3 covering the next 5 years was received in December 2023. The in year variance resulted in a net 17m reduction in the Whole Life Costs. Further offsets against the in year deferrals will be dependant on funding uplifts in FY24/25.","benefits":0.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 0m.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. Delivery to the Maritime Environment remains complex and is regularly impacted by changes to platform availability. There are also ongoing concerns relating to…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 increased from 2028-03-31 to 2029-03-31. This is primarily due to the following factors. Project End Date adjusted to align with Full Business Case 3 which was approved in December 2023. Full Operating Capability is now forecast to be declared in April 2030 primarily due to ship availability beyond the current approval caused by changes in operational deployments.Â","narrativeClaimKind":null},{"id":"MOD_0109_1617-Q2","year":2025,"name":"NEW STYLE OF INFORMATION TECHNOLOGY DEPLOYED","department":"MoD","category":"ICT","description":"The Programme aims to deliver a MOD-owned, highly secure, technologically advanced and evolutionary communications and information service that connects war-fighters and enables information advantage across the operational landscape. It will provide operational commanders in the Maritime and Land environments with a modern, enduring mission configurable command and control IT system that will deliver the operational services that they require at Official, Secret and Mission Secret classifications. The in-house delivery of this new system, known as OpNET, will replace multiple deployable IT systems and will allow the MOD to extract itself from expensive, monolithic support contracts.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Project's Delivery Confidence Assessment rating at 24/25-Q4 is RED, compared with the Infrastructure and Projects Authority's assessment last year of AMBER. This is due to the following factors. The programme is currently running approximately 12 months behind schedule in delivering to Maritime and Land sectors. Maritime delivery continues to pose challenges with frequent disruptions due to changes in platform availability. Within the Land environment, the Front Line Commands are facing difficulties in navigating the complexity of building OpNET nodes, leading to delays in transitioning from legacy systems. Financial and resource constraints have further constrained the programme's ability to address these challenges, thereby exacerbating the situation.","startDate":"2015-04-01","endDate":"2029-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2029.","fyBaseline":115.51,"fyForecast":102.78,"fyVariance":11.02,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. Removal of in-year unspent Risk Inside Costing, resourcing and hardware purchasing efficiencies, changed costings and deferred costings. Increases in the following year will be dependent on funding uplifts for deferred measures.","wholeLifeCost":1399.03,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 1397 to 1399. This is primarily due to the following factors. The project's departmental-agreed Whole Life Cost at 24/25-Q4 increased from £1,397M to £1,399M but remains within approval tolerances.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0.","themes":["Cost & funding","Delivery & schedule","Workforce & capability","Approvals & decisions"],"evidenceExcerpt":"The Project's Delivery Confidence Assessment rating at 24/25-Q4 is RED, compared with the Infrastructure and Projects Authority's assessment last year of AMBER. This is due to the following factors. The programme is currently running approximately 12 months behind schedule in delivering to Maritime and Land sectors. Maritime delivery continues to pose…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2029.","narrativeClaimKind":null},{"id":"MOD_0109_1617-Q2","year":2026,"name":"NEW STYLE OF INFORMATION TECHNOLOGY DEPLOYED","department":"MOD","category":"Information and Communications Technology (ICT)","description":"The Programme aims to deliver a MOD-owned, highly secure, technologically advanced and evolutionary communications and information service that connects war-fighters and enables information advantage across the operational landscape. It will provide operational commanders in the Maritime and Land environments with a modern enduring mission configurable command and control IT system that will deliver the operational services that they require at OFFICIAL, SECRET and Mission SECRET classifications. The in-house delivery of this new system known as OpNET will replace multiple deployable IT systems and will allow the MOD to extract itself from expensive monolithic support contracts.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Red. This is primarily due to the following factors. 1. The programme is currently operating 12 months behind schedule in delivering capability to the Maritime and Land sectors. 2. The delays stem from overly optimistic planning assumptions, ongoing resource and funding constraints, all of which have contributed to increased costs. 3. Delivery to the Land environment is now largely complete, with transition from legacy systems to OpNET expected by end of May 2026. 4. Maritime delivery has gained momentum, however, installation timelines remain constrained by vessel availability. 5. The programme is currently being reset with a reduced scope to ensure it can deliver within budget.","startDate":"2015-04-01","endDate":"2029-03-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the programmes end-date at 25/26-Q4 increased from 31/03/2029 to 30/04/2030. This is primarily due to the following factors. 1. Delays in delivery and the availability of Navy platforms for OpNET to be installed.","fyBaseline":114.02,"fyForecast":111.26,"fyVariance":2.42,"varianceNarrative":"The budget variance is less than or equal to 5%","wholeLifeCost":1598.79,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) remained at £1399M.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmental-agreed monetised benefits at 25/26-Q4 remained at 0m","themes":["Cost & funding","Delivery & schedule","Scope & requirements","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Red. This is primarily due to the following factors. 1. The programme is currently operating 12 months behind schedule in delivering capability to the Maritime and Land sectors. 2. The delays stem from overly optimistic planning…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the programmes end-date at 25/26-Q4 increased from 31/03/2029 to 30/04/2030. This is primarily due to the following factors. 1. Delays in delivery and the availability of Navy platforms for OpNET to be installed.","narrativeClaimKind":null}],"previous":{"id":"MOD_0109_1617-Q2","year":2025,"name":"NEW STYLE OF INFORMATION TECHNOLOGY DEPLOYED","department":"MoD","category":"ICT","description":"The Programme aims to deliver a MOD-owned, highly secure, technologically advanced and evolutionary communications and information service that connects war-fighters and enables information advantage across the operational landscape. It will provide operational commanders in the Maritime and Land environments with a modern, enduring mission configurable command and control IT system that will deliver the operational services that they require at Official, Secret and Mission Secret classifications. The in-house delivery of this new system, known as OpNET, will replace multiple deployable IT systems and will allow the MOD to extract itself from expensive, monolithic support contracts.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Project's Delivery Confidence Assessment rating at 24/25-Q4 is RED, compared with the Infrastructure and Projects Authority's assessment last year of AMBER. This is due to the following factors. The programme is currently running approximately 12 months behind schedule in delivering to Maritime and Land sectors. Maritime delivery continues to pose challenges with frequent disruptions due to changes in platform availability. Within the Land environment, the Front Line Commands are facing difficulties in navigating the complexity of building OpNET nodes, leading to delays in transitioning from legacy systems. Financial and resource constraints have further constrained the programme's ability to address these challenges, thereby exacerbating the situation.","startDate":"2015-04-01","endDate":"2029-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2029.","fyBaseline":115.51,"fyForecast":102.78,"fyVariance":11.02,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. Removal of in-year unspent Risk Inside Costing, resourcing and hardware purchasing efficiencies, changed costings and deferred costings. Increases in the following year will be dependent on funding uplifts for deferred measures.","wholeLifeCost":1399.03,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 1397 to 1399. This is primarily due to the following factors. The project's departmental-agreed Whole Life Cost at 24/25-Q4 increased from £1,397M to £1,399M but remains within approval tolerances.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0.","themes":["Cost & funding","Delivery & schedule","Workforce & capability","Approvals & decisions"],"evidenceExcerpt":"The Project's Delivery Confidence Assessment rating at 24/25-Q4 is RED, compared with the Infrastructure and Projects Authority's assessment last year of AMBER. This is due to the following factors. The programme is currently running approximately 12 months behind schedule in delivering to Maritime and Land sectors. Maritime delivery continues to pose…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2029.","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":0,"attentionScore":35,"attentionReasons":["Current published delivery confidence is Red"]},{"id":"DFT_0413_2425-Q2","year":2026,"name":"Rail Reform: Stand-Up of GBR","department":"DFT","category":"Government Transformation and Service Delivery","description":"The programme will enable the biggest overhaul of the rail sector in a generation. It will enable the establishment of GBR as a new ‘directing mind’ for the railway, unifying track and train under a single public body to deliver better services for passengers and freight customers, and better value for money for taxpayers. GBR will have the tools and operational independence it needs to plan and run the rail system on a long-term basis to deliver for passengers. GBR will make long term capacity allocation, planning and investment decisions to give greater certainty to rail freight operators, open access, and the wider supply chain. The legislation will establish a powerful new passenger watchdog to champion improvements in rail services for passengers. It will protect and advocate for passengers’ interests and rights, offer advice, address unresolved passenger complaints and independently monitor service performance reporting on its findings publicly and transparently.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"The Railways Bill will pave the way for the creation of Great British Railways (GBR), due to be set up later in 2027. The transfer of passenger services to public ownership – a key element of the reform programme – continues at pace, with Govia Thameslink Railway’s (GTR) services the most recent to switch in May this year. The Bill is a key dependency and is currently in Parliament, therefore, it is not possible to predict, the exact scheduling and level of amendments it may still face as part of Lords and Commons scrutiny. Combining these uncertain timescales with the complexity and challenges of key elements of what is the biggest transformation of the railways in a generation, means that the NISTA/SRO Delivery Confidence Assessment (DCA) rating remains RED as of the last two quarters (Q3/Q4) of 2025/26. This rating transparently reflects the level of uncertainty and dependencies and mitigates against optimism bias. However, significant progress continues to be made on all aspects of the reform programme and as a result we expect the delivery confidence to improve. Most notably, work continues on a number of critical design and implementation decisions, alongside government approvals, which are required to deliver the reforms set out in the Bill and GBR itself. These decisions, when made, combined with Parliamentary progress are expected to provide greater clarity and stability across the programme.","startDate":"2024-07-01","endDate":null,"scheduleNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide costs/schedule information","wholeLifeCost":null,"costNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","benefits":null,"benefitsNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","themes":["Delivery & schedule","Cost & funding","Governance & assurance","Scope & requirements"],"evidenceExcerpt":"The Railways Bill will pave the way for the creation of Great British Railways (GBR), due to be set up later in 2027. The transfer of passenger services to public ownership – a key element of the reform programme – continues at pace, with Govia Thameslink Railway’s (GTR) services the most recent to switch in May this year. The Bill is a key dependency and…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","narrativeClaimKind":null,"history":[{"id":"DFT_0413_2425-Q2","year":2026,"name":"Rail Reform: Stand-Up of GBR","department":"DFT","category":"Government Transformation and Service Delivery","description":"The programme will enable the biggest overhaul of the rail sector in a generation. It will enable the establishment of GBR as a new ‘directing mind’ for the railway, unifying track and train under a single public body to deliver better services for passengers and freight customers, and better value for money for taxpayers. GBR will have the tools and operational independence it needs to plan and run the rail system on a long-term basis to deliver for passengers. GBR will make long term capacity allocation, planning and investment decisions to give greater certainty to rail freight operators, open access, and the wider supply chain. The legislation will establish a powerful new passenger watchdog to champion improvements in rail services for passengers. It will protect and advocate for passengers’ interests and rights, offer advice, address unresolved passenger complaints and independently monitor service performance reporting on its findings publicly and transparently.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"The Railways Bill will pave the way for the creation of Great British Railways (GBR), due to be set up later in 2027. The transfer of passenger services to public ownership – a key element of the reform programme – continues at pace, with Govia Thameslink Railway’s (GTR) services the most recent to switch in May this year. The Bill is a key dependency and is currently in Parliament, therefore, it is not possible to predict, the exact scheduling and level of amendments it may still face as part of Lords and Commons scrutiny. Combining these uncertain timescales with the complexity and challenges of key elements of what is the biggest transformation of the railways in a generation, means that the NISTA/SRO Delivery Confidence Assessment (DCA) rating remains RED as of the last two quarters (Q3/Q4) of 2025/26. This rating transparently reflects the level of uncertainty and dependencies and mitigates against optimism bias. However, significant progress continues to be made on all aspects of the reform programme and as a result we expect the delivery confidence to improve. Most notably, work continues on a number of critical design and implementation decisions, alongside government approvals, which are required to deliver the reforms set out in the Bill and GBR itself. These decisions, when made, combined with Parliamentary progress are expected to provide greater clarity and stability across the programme.","startDate":"2024-07-01","endDate":null,"scheduleNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide costs/schedule information","wholeLifeCost":null,"costNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","benefits":null,"benefitsNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","themes":["Delivery & schedule","Cost & funding","Governance & assurance","Scope & requirements"],"evidenceExcerpt":"The Railways Bill will pave the way for the creation of Great British Railways (GBR), due to be set up later in 2027. The transfer of passenger services to public ownership – a key element of the reform programme – continues at pace, with Govia Thameslink Railway’s (GTR) services the most recent to switch in May this year. The Bill is a key dependency and…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","narrativeClaimKind":null}],"previous":null,"ratingDelta":null,"transition":"Not comparable","endDateDeltaDays":null,"attentionScore":35,"attentionReasons":["Current published delivery confidence is Red"]},{"id":"MOJ_0061_2122-Q3","year":2026,"name":"Decommission and Legacy Risk Migration (DLRM)","department":"MOJ","category":"Information and Communications Technology (ICT)","description":"The Decommissioning and Legacy Risk Mitigation (DLRM) Programme has been established to mitigate the risks presented by HMCTS legacy technology. The DLRM Programme will retire aged and unused applications and update and migrate existing applications to supported hosting environments","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is driven primarily due to continued delivery risk driven by complex design challenges.","startDate":"2021-07-01","endDate":"2028-09-30","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 changed from 31/03/28 to 30/09/28. This is primarily due to the programme allowing additional time to ensure a full closure process is completed.","fyBaseline":45.51,"fyForecast":36.81,"fyVariance":19.12,"varianceNarrative":"The budget variance exceeds 5%. The underspend is due to reduced in-year activities requiring costs to be re-profiled into future years.","wholeLifeCost":273.28,"costNarrative":"Compared to financial year 24/25-Q4, the project's Whole Life Cost at 25/26-Q4 reduced to £273.28m. The Whole Life Cost remains aligned to the current baseline business case. All costs have been reported in 2024/25 base prices in line with NISTA requirements. This is a change from previous years where costs were reported in nominal prices. All costs reflect this accounting reduction regardless of any actual changes.","benefits":null,"benefitsNarrative":"The project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) is 0. This project currently reports no monetised benefits. The project's benefits focus on reducing the risk of legacy technology through decommission, transition and replacement.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is driven primarily due to continued delivery risk driven by complex design challenges. Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 changed from 31/03/28 to 30/09/28. This is primarily due to the…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 changed from 31/03/28 to 30/09/28. This is primarily due to the programme allowing additional time to ensure a full closure process is completed.","narrativeClaimKind":null,"history":[{"id":"MOJ_0061_2122-Q3","year":2022,"name":"HMCTS Decommission and Legacy Risk Mitigation (DLRM) Programme","department":"MOJ","category":"ICT","description":"The Decommission and Legacy Risk Mitigation (DLRM) Programme has been established to mitigate the risks presented by HMCTS' legacy technology. The DLRM Programme will retire aged and unsued applications where possible and for those applications still required it will update the application and migrate it to supported hosting environments.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Senior Responsible Owner Delivery Confidence Assessment rating at 21/22-Q4 is Amber. This is the first time data has been published for this project, which has been added to GMPP over the last year. The DCA is Amber primarily due to the following factors: Complexity relating to how live data is migrated and the significant volume of commercial and procurement activity that needs to be delivered in a short timeframe.","startDate":"2021-07-01","endDate":"2028-03-31","scheduleNarrative":"Your project end-date is 31 MAR 2028. This is primarily due to the following factors: The project is on track for completion by March 2028.","fyBaseline":12.21,"fyForecast":11.05,"fyVariance":-10.0,"varianceNarrative":"The variance is due to a revised procurement approach which resulted in the contract award being delayed and moving to FY2022/23 (£0.7m); running costs associated with that contract were also delayed (£0.2m). The remainder is slippage within one of the workstreams (£0.2m).","wholeLifeCost":198.0,"costNarrative":"Your projects Baseline Whole Life Cost is 197.91 (£m). This is primarily due to the following factors: Whole life cost is on track for £197.91m","benefits":null,"benefitsNarrative":"","themes":["Commercial & supply chain","Cost & funding","Delivery & schedule","Technical & integration"],"evidenceExcerpt":"The Senior Responsible Owner Delivery Confidence Assessment rating at 21/22-Q4 is Amber. This is the first time data has been published for this project, which has been added to GMPP over the last year. The DCA is Amber primarily due to the following factors: Complexity relating to how live data is migrated and the significant volume of commercial and…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Your project end-date is 31 MAR 2028. This is primarily due to the following factors: The project is on track for completion by March 2028.","narrativeClaimKind":null},{"id":"MOJ_0061_2122-Q3","year":2023,"name":"Decommission and Legacy Risk Mitigation (DLRM)","department":"MOJ","category":"ICT","description":"The Decommission and Legacy Risk Mitigation (DLRM) Programme has been established to mitigate the risks presented by HMCTS legacy technology. The DLRM Programme will retire aged and unused applications where possible and for those applications still required it will update the application and migrate it to supported hosting environments.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 21/22-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. Compared to 21/22 Q4, the project's Delivery Confidence Assessment rating remained Amber.The Amber assessment is due tocomplexity risks in the migration of live data. The programme has exceeded its Year 1 target.","startDate":"2021-07-01","endDate":"2028-03-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2028-03-31. This is primarily due to the following factors. The project remains on track for completion in line with the current baseline schedule.","fyBaseline":51.53,"fyForecast":27.15,"fyVariance":-47.0,"varianceNarrative":"Underspend in 22-23 arises from the project not needing to call on contingency and optimism bias and reduction of costs more generally, with a small level of slippage into 2023-24. The programme remains on track and exceeded milestones set. The reduction in cost of the programme does not affect the delivery of the overall programme core milestones, which remain affordable.","wholeLifeCost":198.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 remained at 198m. This is primarily due to the following factors. The Whole Life Cost has remained static, and the budget remains aligned to the current baseline business case.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This project currently reports no monetised benefits. The project benefits focus on reducing the risk of legacy technology through decommission, transition and replacement.","themes":["Cost & funding","Delivery & schedule","Technical & integration","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. Compared to 21/22 Q4, the project's Delivery Confidence Assessment rating remained Amber.The Amber assessment is due tocomplexity risks in the migration of live data. The…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2028-03-31. This is primarily due to the following factors. The project remains on track for completion in line with the current baseline schedule.","narrativeClaimKind":null},{"id":"MOJ_0061_2122-Q3","year":2024,"name":"Decommission and Legacy Risk Mitigation (DLRM)","department":"MOJ","category":"ICT","description":"The Decommission and Legacy Risk Mitigation (DLRM) Programme has been established to mitigate the risks presented by HMCTS legacy technology. The DLRM Programme will retire aged and unused applications where possible and for those applications still required it will update the application and migrate it to supported hosting environments.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. Data migration issues impacting timelines.","startDate":"2021-07-01","endDate":"2028-03-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2028-03-31. This is primarily due to the following factors. The project is on track to deliver against the baseline schedule.","fyBaseline":55.39,"fyForecast":48.63,"fyVariance":-12.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The underspend is due to the project not needing to call on cost contingency included in the baseline budgets.","wholeLifeCost":199.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 increased from 198m. to 199m. This is primarily due to the following factors. The Whole Life Cost has remained largely static, and the budget remains aligned to the current baseline business case.","benefits":0.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 0m. This project currently reports no monetised benefits. The project's benefits focus on reducing the risk of legacy technology through decommission, transition and replacement.","themes":["Cost & funding","Delivery & schedule","Technical & integration","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. Data migration issues impacting timelines. Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2028-03-31. This is…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2028-03-31. This is primarily due to the following factors. The project is on track to deliver against the baseline schedule.","narrativeClaimKind":null},{"id":"MOJ_0061_2122-Q3","year":2025,"name":"Decommission and Legacy Risk Migration (DLRM)","department":"MoJ","category":"ICT","description":"The Decommission and Legacy Risk Mitigation (DLRM) Programme has been established to mitigate the risks presented by HMCTS legacy technology. The DLRM Programme will retire aged and unused applications where possible and for those applications still required it will update the application and migrate it to supported hosting environments.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER. This is due to‚ Data migration issues impacting timelines.","startDate":"2021-07-01","endDate":"2028-03-31","scheduleNarrative":"The project's end-date at 24/25-Q4 is scheduled to be 31/03/2028. This is primarily due to the following factors‚ The project is on track to deliver against the baseline schedule.","fyBaseline":40.22,"fyForecast":38.84,"fyVariance":3.43,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":273.35,"costNarrative":"The project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) is 273. This is primarily due to the following factors‚ Complexity of legacy technology, and increased supplier costs partially driven by inflation.","benefits":0.0,"benefitsNarrative":"The project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) is 0. This is primarily due to the following factors‚ This project currently reports no monetised benefits. The project's benefits focus on reducing the risk of legacy technology through decommission, transition and replacement.","themes":["Cost & funding","Technical & integration","Commercial & supply chain","Delivery & schedule"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER. This is due to‚ Data migration issues impacting timelines. The project's end-date at 24/25-Q4 is scheduled to be 31/03/2028. This is primarily due to the following factors‚ The project is on track to deliver against the baseline schedule.","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 24/25-Q4 is scheduled to be 31/03/2028. This is primarily due to the following factors‚ The project is on track to deliver against the baseline schedule.","narrativeClaimKind":null},{"id":"MOJ_0061_2122-Q3","year":2026,"name":"Decommission and Legacy Risk Migration (DLRM)","department":"MOJ","category":"Information and Communications Technology (ICT)","description":"The Decommissioning and Legacy Risk Mitigation (DLRM) Programme has been established to mitigate the risks presented by HMCTS legacy technology. The DLRM Programme will retire aged and unused applications and update and migrate existing applications to supported hosting environments","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is driven primarily due to continued delivery risk driven by complex design challenges.","startDate":"2021-07-01","endDate":"2028-09-30","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 changed from 31/03/28 to 30/09/28. This is primarily due to the programme allowing additional time to ensure a full closure process is completed.","fyBaseline":45.51,"fyForecast":36.81,"fyVariance":19.12,"varianceNarrative":"The budget variance exceeds 5%. The underspend is due to reduced in-year activities requiring costs to be re-profiled into future years.","wholeLifeCost":273.28,"costNarrative":"Compared to financial year 24/25-Q4, the project's Whole Life Cost at 25/26-Q4 reduced to £273.28m. The Whole Life Cost remains aligned to the current baseline business case. All costs have been reported in 2024/25 base prices in line with NISTA requirements. This is a change from previous years where costs were reported in nominal prices. All costs reflect this accounting reduction regardless of any actual changes.","benefits":null,"benefitsNarrative":"The project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) is 0. This project currently reports no monetised benefits. The project's benefits focus on reducing the risk of legacy technology through decommission, transition and replacement.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is driven primarily due to continued delivery risk driven by complex design challenges. Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 changed from 31/03/28 to 30/09/28. This is primarily due to the…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 changed from 31/03/28 to 30/09/28. This is primarily due to the programme allowing additional time to ensure a full closure process is completed.","narrativeClaimKind":null}],"previous":{"id":"MOJ_0061_2122-Q3","year":2025,"name":"Decommission and Legacy Risk Migration (DLRM)","department":"MoJ","category":"ICT","description":"The Decommission and Legacy Risk Mitigation (DLRM) Programme has been established to mitigate the risks presented by HMCTS legacy technology. The DLRM Programme will retire aged and unused applications where possible and for those applications still required it will update the application and migrate it to supported hosting environments.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER. This is due to‚ Data migration issues impacting timelines.","startDate":"2021-07-01","endDate":"2028-03-31","scheduleNarrative":"The project's end-date at 24/25-Q4 is scheduled to be 31/03/2028. This is primarily due to the following factors‚ The project is on track to deliver against the baseline schedule.","fyBaseline":40.22,"fyForecast":38.84,"fyVariance":3.43,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":273.35,"costNarrative":"The project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) is 273. This is primarily due to the following factors‚ Complexity of legacy technology, and increased supplier costs partially driven by inflation.","benefits":0.0,"benefitsNarrative":"The project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) is 0. This is primarily due to the following factors‚ This project currently reports no monetised benefits. The project's benefits focus on reducing the risk of legacy technology through decommission, transition and replacement.","themes":["Cost & funding","Technical & integration","Commercial & supply chain","Delivery & schedule"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER. This is due to‚ Data migration issues impacting timelines. The project's end-date at 24/25-Q4 is scheduled to be 31/03/2028. This is primarily due to the following factors‚ The project is on track to deliver against the baseline schedule.","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 24/25-Q4 is scheduled to be 31/03/2028. This is primarily due to the following factors‚ The project is on track to deliver against the baseline schedule.","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":183,"attentionScore":34,"attentionReasons":["Current published delivery confidence is Amber","Published end date moved 183 days later","In-year forecast variance is +19.1%"]},{"id":"MOD_0114_1718-Q1","year":2026,"name":"DEFENCE ESTATE OPTIMISATION","department":"MOD","category":"Military Capability","description":"Defence Estate Optimisation (DEO) Portfolio is a long-term investment of £5.1Bn to modernise the defence estate. It is an ambitious portfolio of construction activity, unit and personnel moves, and site disposals that will deliver a better structured, modern, and more sustainable estate to support military capability.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors. 1. The Delivery Confidence Assessment rating at the end of the financial year remains at AMBER, reflecting the complexity and long timeline of the Portfolio. Ongoing engagement with NISTA confirmed satisfaction with the close monitoring of activities, ongoing assessment of external events, and the adoption of previous review recommendations. 2. The governance structure, led by central Military Strategic Headquarters management, is clearly effective, supporting strong relationships and providing a defence-wide perspective. 3. Now in the delivery phase, the Portfolio has successfully implemented the Contract Permissioning Group (CPG), which has reduced standard approval timings to 5 weeks for Category A and 3 weeks for Category D and C projects. 4. Projects enter the strategic alliance framework within 1-2 weeks, cutting procurement timelines by up to 18 months. 5. The CPG delegated timeframe has concluded, and the Portfolio awaits the outcome of the Defence Implementation Plan before continuing the Review Note.","startDate":"2016-09-30","endDate":"2041-03-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 31/03/2041.","fyBaseline":480.66,"fyForecast":251.98,"fyVariance":47.58,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. 1. The delay in Defence Investment Plan read out and confirmation of any imposed measures has led to affordability confirmation delays for projects in scope. 2. The introduction of commitment controls for RDEL, CDEL and External Assistance has resulted in delays to placing projects on contract. With projects experiencing delays of several months in decision making. 3. Legal, commercial, financial and security challenges leading to delays. 4. Affordability challenges presented by some projects have necessitated a resubmission and reduction in scope to meet Affordability targets. 5. The new design and build contracting process has taken projects and suppliers longer than envisaged to navigate through the complex process. The above has resulted in project schedules being updated, changing funding profiles into future years.","wholeLifeCost":5949.19,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) increased from £6376.29M to £6385.83M. This is primarily due to the following factors. 1. The Defence Estate Optimisation budget has remained stable throughout FY25/26. The delay to the Defence Investment Plan read out has led to the portfolio to hold within its budget however, an increase in the while life costs is now forecast. 2. Options have been presented to continue to deliver to the current approved Whole Life Cost estimates, including a potential reduction in funding should the Defence Investment Plan conclude as such.","benefits":13085.8,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 21281.95. This is primarily due to the following factors. The Defence Estate Optimisation benefits remained steady as per V13. Following the Defence Implementation Plan outcome we expect to see some movement dependent on the settlement.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors. 1. The Delivery Confidence Assessment rating at the end of the financial year remains at AMBER, reflecting the complexity and long timeline of the Portfolio. Ongoing engagement with…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 31/03/2041.","narrativeClaimKind":null,"history":[{"id":"MOD_0114_1718-Q1","year":2020,"name":"Defence Estate Optimisation","department":"MOD","category":"Military Capability","description":"Helping create a smaller, better and a more efficient estate to deliver the required Military Capability.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber/Red, which has not changed since last year�s Q2 1819 Amber/Red, due primarily to the following factors; - The abolition of PF2 as a funding source as a result of changes to the Private Funding rules by HMT. Subsequent clarification from Treasury indicates that opportunities for the use of private finance within government are limited and will most likely score �on balance sheet� and require the provision of capital budget. - The impact on delivery of the DEO Portfolio with the transition from the DIO Strategic Business Partner (SBP) to Civil Service leadership and Client Side Partner (CSP). The risk from the handover of responsibilities was partly mitigated through extending the contracts of some delivery staff in key roles but required the onboarding of circa 100 civil servant and contractor staff in the last 12 months. This is providing required resource in both Project delivery and supporting Programme Management, Commercial and Technical functions. - DEO portfolio has been reviewed and revised to align delivery plans with financial planning in ABC20 through a rebaselining exercise. This was undertaken collaboratively between DIO, TLB's and FMC to ensure full transparency of content, schedule and financial implications. Since the Q2 1920 (30th September 2019) Amber/Red IPA DCA, the following non-project operating environment activities have impacted the original Q2 IPA DCA; - Capacity of suppliers remains a concern given high numbers of major Gov Infra Prog's and Defence Proj. Comms strategy for extensive Assessment Study activity has been developed for review and signoff. A Request for Information was issued to Industry. - The arrangement/Invitation to Tender (ITT) for financial support (Private Finance Technical Support - PFTS) has been temporarily paused, required in May 2020. CCS to award a Construction Capital works Framework in Autumn, DIO to fully mobilise by Q1 20/21. Engagement with Treasury on alternate (PF) funding options continues, led by the SRO.","startDate":"2016-11-01","endDate":"2041-03-31","scheduleNarrative":"The scheduled baseline project end date at Q2 1920 (30th September 2019) is 31/03/41, has not changed since last year's Q2 1819 date of 31/03/41, due primarily to the following factors; - No Change - The Portfolio will be delivered in sequential waves: PF and Wave 1 then Wave 2 and possibly then some of Wave 3. Wave 2 onwards is funded from the receipts of the preceding wave so rely on timeliness of delivery and overall receipts generated. Wave 2 onwards are therefore a series of candidate projects that will be matured, programmed and delivered as confidence in the preceding waves improves.","fyBaseline":19.37,"fyForecast":11.75,"fyVariance":-39.0,"varianceNarrative":"The 19/20 in-year baseline / forecast variance at Q2 1920 (30th September 2019) of -39%, is due primarily to the following factors; - Schedule changes resulting from re-programming activity have impacted expected delivery of Portfolio activity; in particular, the commencement of assessment studies, tendering for infrastructure solutions and construction - Contracts to obtain industry technical support for the development and delivery of site disposals, have been tendered and mobilised more slowly than anticipated. Overall disposals have not been impacted. Since the Q2 1920 (30th September 2019) 19/20 in-year baseline / forecast variance of -39%, the following primary project actions have impacted the original Q2 19/20 in-year variance; - We have re-baselined the schedule to take account of approval timelines to improve cost estimating and profiling. - We have utilised our industry partner to introduce an assessment study model that improves cost estimating accuracy and profiling - We have standardised the approach to business case submissions and stakeholder management leading to smoother and timely approvals","wholeLifeCost":1754.74,"costNarrative":"The baseline Whole Life Cost at Q2 1920 (30th September 2019) is �1,754.74 m, has increased by �587.87 m since last year's Q2 1819 (�m) baseline Whole Life Cost of �1,166.87 m, due primarily to the following factors; - Increase to the Budget Line for PF2 within the v8 baseline to reflect additional PF cost requirements that had not been captured within v6 (as reported at Q2 18/19). Please note that the V8 baseline pre-dated PF2 withdrawal. - Increase in the budget provision to enable preliminary/feasibility studies and to procure private sector expertise to develop and deliver disposals and a Private Finance 2 (PF2) pipeline. Since the Q2 1920 (30th September 2019) �1,754.74 m baseline Whole Life Cost, the following primary project actions have impacted the original Q2 baseline Whole Life Cost; - We have undertaken a series of procurements to obtain industry support to develop and deliver DEO. - We have revised the DEO Portfolio budget profile as the baseline requirement has evolved.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Workforce & capability","Technical & integration"],"evidenceExcerpt":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber/Red, which has not changed since last year�s Q2 1819 Amber/Red, due primarily to the following factors; - The abolition of PF2 as a funding source as a result of changes to the Private Funding rules by HMT. Subsequent clarification from Treasury indicates that…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2020","sourceLabel":"IPA Annual Report 2019-20","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The scheduled baseline project end date at Q2 1920 (30th September 2019) is 31/03/41, has not changed since last year's Q2 1819 date of 31/03/41, due primarily to the following factors; - No Change - The Portfolio will be delivered in sequential waves: PF and Wave 1 then Wave 2 and possibly then some of Wave 3. Wave 2 onwards is funded from the receipts of the preceding wave so rely on timeliness of delivery and overall receipts generated. Wave 2 onwards are therefore a series of candidate projects that will be matured, programmed and delivered as confidence in the preceding waves improves.","narrativeClaimKind":null},{"id":"MOD_0114_1718-Q1","year":2021,"name":"Defence Estate Optimisation","department":"MOD","category":"Military Capability","description":"Defence Estates Optimisation�is a long-term investment to modernise the defence estate. It is an ambitious 25-year portfolio of construction activity, unit and personnel moves, and site disposals that will deliver a better structured, more economical and modern estate that more effectively supports military capability.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber/red. This is primarily due to the following factors: The Departmental Integrated Review has provided a clear capability requirement and resolved the Defence Estate Optimisation funding shortfall. This should increase the assessment from Amber/Red to Amber. The portfolio is now planning to restructure it's operating model to take forward the outcomes from the review.","startDate":"2016-09-30","endDate":"2041-03-31","scheduleNarrative":"Compared to financial year 19/20-Q2, the project's end-date remained scheduled to finish on 31 March 2041 . This is primarily due to the following factors: There are a number of reasons for schedule changes (both positive and negative) across the portfolio since the last Annual Report of Major Projects (Q2 2019). During this period of time the portfolio has updated its operational Performance Measurement Baseline on two occasions in March 2020 and December 2020. The significant driving factor for the December 2020 baseline change was to consolidate changes from Infrastructure Optimisation, the Team responsible for reviewing the capacity on re-provision sites, and establish a programme baseline to measure progress against. The December 2020 baseline update captured significant programme changes that had been identified, most notably (i) capture changes from the Army War Gaming exercise in Q2 2020, (ii) significant scope changes i.e. removal of Aspirational Wave from programme, (iii) Alignment to Annual Budgetry Cycle 21 / Infrastructure Review Planning Costs 3 forecasts (iv) general project / programme maturity changes identified though Assessment Studies, or through the Portfolio Change Process.","fyBaseline":47.1,"fyForecast":46.22,"fyVariance":-2.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":1266.33,"costNarrative":"Compared to financial year 19/20-Q2, the projects Baseline Whole Life Cost increased from �1166.85m to �1266.33m. This is primarily due to the following factors: Q2 19/20 was based on Version 8 of the baseline, whilst Q4 20/21 reflects activity undertaken related to Version 10.2. Specifically focusing on the changes to the Whole Life Cost there are 2 Key Factors: 1. Defence Estates Optimisation portfolio scope changed, principally the Rotary (helicopter) programme has been removed from the Aspirational Wave from the portfolio, this had an approximate value of �1.7Bn. 2. The removal of Private Finance has resulted in a reduction in Resource Departmental Expenditure Limits�as the Unitary Charge no longer applies. The Capital Departmental Expenditure Limits demand has increased as a result of the On-Balance sheet accounting treatment but this is offset by the removal of Rotary (helicopter) referenced previously.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber/red. This is primarily due to the following factors: The Departmental Integrated Review has provided a clear capability requirement and resolved the Defence Estate Optimisation funding shortfall. This should increase the…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 19/20-Q2, the project's end-date remained scheduled to finish on 31 March 2041 . This is primarily due to the following factors: There are a number of reasons for schedule changes (both positive and negative) across the portfolio since the last Annual Report of Major Projects (Q2 2019). During this period of time the portfolio has updated its operational Performance Measurement Baseline on two occasions in March 2020 and December 2020. The significant driving factor for the December 2020 baseline change was to consolidate changes from Infrastructure Optimisation, the Team responsible for reviewing the capacity on re-provision sites, and establish a programme baseline to measure progress against. The December 2020 baseline update captured significant programme changes that had been identified, most notably (i) capture changes from the Army War Gaming exercise in Q2 2020, (ii) significant scope changes i.e. removal of Aspirational Wave from programme, (iii) Alignment to Annual Budgetry Cycle 21 / Infrastructure Review Planning Costs 3 forecasts (iv) general project / programme maturity changes identified though Assessment Studies, or through the Portfolio Change Process.","narrativeClaimKind":null},{"id":"MOD_0114_1718-Q1","year":2022,"name":"Defence Estate Optimisation","department":"MOD","category":"Military Capability","description":"Defence Estates Optimisation is a long-term investment to modernise the defence estate. It is an ambitious 25-year portfolio of construction activity, unit and personnel moves, and site disposals that will deliver a better structured, more economical and modern estate that more effectively supports military capability.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating decreased from Amber/Red to Amber. This is primarily due to the following factors: The removal of the incremental Amber/Red and Amber Green assessment rating. The new Delivery Commercial and Procurement Strategy as the preferred method of procurement, will enable an efficient framework alliance contract and embeds 2 stage procurement. This is still waiting final approval.","startDate":"2016-09-30","endDate":"2041-03-31","scheduleNarrative":"Compared to 2021-Q4, the project end-date remained scheduled to finish on 31 March 41.","fyBaseline":82.71,"fyForecast":71.12,"fyVariance":-13.0,"varianceNarrative":"The budget variance exceeds 5%. During FY 20/21 the Defence Estates Optimisation Portfolio was re-baselined and budget amended to reflect the Spending Review outcome and COVID-19 impacts, therefore there is no longer an affordability issue except for the aspirational projects such as disposal or relocation of existing unit locations. These will be further considered as part of the work to develop a new baseline together with the outcomes expected from the Integrated Review. This revised baseline will be generated during FY 22/23.","wholeLifeCost":5394.0,"costNarrative":"Compared to 2021-Q4, the projects Baseline Whole Life Costs increased from 1266.33 (£m) to 5393.69 (£m). The remaining whole life variance is predominantly due to the remaining element of the Aspirational projects which did not form part of the Spending Review proposition and as part of the re-baselining exercise. Defence is considering whether these projects remain a viable proposition for this portfolio.","benefits":null,"benefitsNarrative":"","themes":["Commercial & supply chain","Cost & funding","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating decreased from Amber/Red to Amber. This is primarily due to the following factors: The removal of the incremental Amber/Red and Amber Green assessment rating. The new Delivery Commercial and Procurement Strategy as the preferred method of…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to 2021-Q4, the project end-date remained scheduled to finish on 31 March 41.","narrativeClaimKind":null},{"id":"MOD_0114_1718-Q1","year":2023,"name":"Defence Estate Optimisation","department":"MOD","category":"Military Capability","description":"Defence Estate Optimisation Portfolio is a long-term investment of 5.1Bn to modernise the defence estate. It is an ambitious portfolio of construction activity; unit and personnel moves; and site disposals that will deliver a better structured; modern; and more sustainable estate to support military capability.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber (SRO rating). This is primarily due to the following factors. Recognition of the long complex timeline of the Portfolio, which is now maturing swiftly into the delivery phase. The impact of cost growth driven by emerging net zero sustainability requirements in addition to the construction industry inflation are currently being assessed.","startDate":"2016-09-30","endDate":"2041-03-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2041-03-31. This is primarily due to the following factors. NA","fyBaseline":97.47,"fyForecast":51.3,"fyVariance":-47.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors: 1. A change in the commercial approach regarding Service Family Accommodation purchases, has resulted in a reduction of an in-year spend opportunity. 2. The adoption of the new Delivery Commercial Procurement Strategy throughout the programme has resulted in in-year funding being allocated into future years; in line with the new approach to design and build. While funding has been reprofiled in line with new build stages; in service dates remain extant.","wholeLifeCost":5438.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 increased from 5394m. to 5438m. This is primarily due to the following factors. Following the Integrated Review and the Future Soldier Programme, the Programme has been rebaselined and endorsed by the Portfolio Board and programme schedules updated. Following the schedule amendments, budgets have been realigned. This has resulted in a reduction in resource costs including removal of the need for Private Finance, offset by an increase in construction costs driven by the increase in the indices rates used to apply inflation.","benefits":5466.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 5466m. Disposal receipts received for vacated sites, reduced infrastructure running costs at vacated sites and avoidance of lifecycle replacement costs at vacated sites.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber (SRO rating). This is primarily due to the following factors. Recognition of the long complex timeline of the Portfolio, which is now maturing swiftly into the delivery phase. The impact of cost growth driven by emerging net zero sustainability…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2041-03-31. This is primarily due to the following factors. NA","narrativeClaimKind":null},{"id":"MOD_0114_1718-Q1","year":2024,"name":"Defence Estate Optimisation","department":"MOD","category":"Military Capability","description":"Defence Estate Optimisation (DEO) Portfolio is a long-term investment of 5.1bn to modernise the defence estate. It is an ambitious portfolio of construction activity, unit and personnel moves; and site disposals that will deliver a better structured, modern, and more sustainable estate to support military capability.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure and Projects Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. An IPA review in January 2024 confirmed the Review Team were “satisfied with the close monitoring of Portfolio activities underway, continued monitoring of external events affecting the Portfolio and the adoption of previous recommendations.”. It was recognised that the “governance structure based around central management was clearly working well and supports strong working relationships while providing a defence wide perspective and is a key driver for the current and future success”. The Portfolio is now in the delivery phase, successfully implementing the Contract Permissioning Group (CPG), designed to improve the efficiency and pace of approvals, and reduce procurement timeline for projects by up to 18 months.","startDate":"2016-09-30","endDate":"2041-03-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the programme's end-date at 23/24-Q4 remained scheduled to finish on 2041-03-31. The portfolio has been re-baselined but the overall completion date has not been impacted.","fyBaseline":159.316,"fyForecast":105.757,"fyVariance":-33.618,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The adoption and refinement of project delivery under the new Delivery Commercial Procurement Strategy throughout Defence Estate Optimisation has resulted in in-year funding being allocated into future years, in line with the new approach to design and build. Additionally there have been legal, commercial and security challenges leading to delays due to changes in procurement strategy and design scope. Resulting in a reprofile of spend into future years.","wholeLifeCost":5208.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 decreased from 5438m to 5208m. This is primarily due to the following factors. Last year’s budget was set against Portfolio Baseline Version 11. The Defence Estate Optimisation budgets have been realigned to Version 12, which now includes the adoption of the new Delivery Commercial Procurement Strategy and endorsed by the Portfolio Board. As such programme schedules have been updated to align with this framework. The outcome has been the reprofiling of projects across the portfolio, culminating in reduced costs overall.","benefits":17656.0,"benefitsNarrative":"At financial year 23/24-Q4, the projected departmental benefits were 17656m. This is primarily due to the following factors. Disposal receipts received from disposed sites, reduced infrastructure running costs and avoidance of lifecycle replacement costs at vacated sites together with the removal of projects from the portfolio.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure and Projects Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. An IPA review in January 2024 confirmed the Review Team were “satisfied with the close monitoring of Portfolio activities underway, continued monitoring of…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 22/23-Q4, the programme's end-date at 23/24-Q4 remained scheduled to finish on 2041-03-31. The portfolio has been re-baselined but the overall completion date has not been impacted.","narrativeClaimKind":null},{"id":"MOD_0114_1718-Q1","year":2025,"name":"DEFENCE ESTATE OPTIMISATION","department":"MoD","category":"Military Capability","description":"Defence Estate Optimisation Portfolio is a long-term investment of £5.1Bn to modernise the defence estate. It is an ambitious portfolio of construction activity, unit and personnel moves, and site disposals that will deliver a better structured, modern, and more sustainable estate to support military capability.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Project's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER, compared with the Infrastructure and Projects Authority's assessment last year of AMBER. This is due to the following factors. Compared to financial year 23/24-Q4, the NISTA Delivery Confidence Assessment rating at 24/25-Q4 remained at Amber. This is primarily due to the following factors: The programme's complexity and long timeline. Close monitoring of this suite of activities continues and is subject to a governance structure based around central Finance Military Capability management that is working well and supports strong working relationships while providing a defence wide perspective and is a key driver for the current and future success. The Portfolio is now in the delivery phase, successfully implementing the Contract Permissioning Group, designed to improve the efficiency and pace of approvals, enabling a reduction in standard approvals timing to 5-weeks. This framework will reduce the procurement timelines for projects by up to 18 months.","startDate":"2016-09-30","endDate":"2041-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2041.","fyBaseline":213.53,"fyForecast":193.56,"fyVariance":9.35,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The Defence Estate Optimisation in year variance, an overall underspend against its issued budget. This is due to the following main drivers: 1. The introduction of additional spending controls and lack of resource within commercial function has resulted in delays to placing projects on contract. 2. Additionally there have been legal, commercial and security challenges leading to delays. 3. The new design and build contracting process has taken projects and suppliers longer than envisaged to navigate through the complex process. 4. Affordability challenges presented by some projects have necessitated a resubmission and reduction in scope to meet Affordability targets. This has resulted in project schedules being updated, changing funding profiles into future years.","wholeLifeCost":6376.29,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 5208 to 6376. This is primarily due to the following factors. The Defence Estate Optimisation budgets have been realigned to V13 from V12 baseline. This has been endorsed by the Portfolio Board, resulting in increased Whole Life Total costs. This is partly due to additional spend controls, with initial projects and suppliers taking additional time adapting to the complexities of the new design and build contract process leading to further delays. Project costs for some sites have matured and been updated by the project teams as they were initially based on early estimates, leading to new cost models and increased scope due to refined stakeholder needs. Recent economic challenges like rising material, inflation, and labour costs have placed a further strain on the portfolio. Committing to evolving standards like Net Zero and carbon savings has compounded the case further.","benefits":21281.95,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 17656 to 21281. This is primarily due to the following factors.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Scope & requirements"],"evidenceExcerpt":"The Project's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER, compared with the Infrastructure and Projects Authority's assessment last year of AMBER. This is due to the following factors. Compared to financial year 23/24-Q4, the NISTA Delivery Confidence Assessment rating at 24/25-Q4 remained at Amber. This is primarily due to the following…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2041.","narrativeClaimKind":null},{"id":"MOD_0114_1718-Q1","year":2026,"name":"DEFENCE ESTATE OPTIMISATION","department":"MOD","category":"Military Capability","description":"Defence Estate Optimisation (DEO) Portfolio is a long-term investment of £5.1Bn to modernise the defence estate. It is an ambitious portfolio of construction activity, unit and personnel moves, and site disposals that will deliver a better structured, modern, and more sustainable estate to support military capability.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors. 1. The Delivery Confidence Assessment rating at the end of the financial year remains at AMBER, reflecting the complexity and long timeline of the Portfolio. Ongoing engagement with NISTA confirmed satisfaction with the close monitoring of activities, ongoing assessment of external events, and the adoption of previous review recommendations. 2. The governance structure, led by central Military Strategic Headquarters management, is clearly effective, supporting strong relationships and providing a defence-wide perspective. 3. Now in the delivery phase, the Portfolio has successfully implemented the Contract Permissioning Group (CPG), which has reduced standard approval timings to 5 weeks for Category A and 3 weeks for Category D and C projects. 4. Projects enter the strategic alliance framework within 1-2 weeks, cutting procurement timelines by up to 18 months. 5. The CPG delegated timeframe has concluded, and the Portfolio awaits the outcome of the Defence Implementation Plan before continuing the Review Note.","startDate":"2016-09-30","endDate":"2041-03-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 31/03/2041.","fyBaseline":480.66,"fyForecast":251.98,"fyVariance":47.58,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. 1. The delay in Defence Investment Plan read out and confirmation of any imposed measures has led to affordability confirmation delays for projects in scope. 2. The introduction of commitment controls for RDEL, CDEL and External Assistance has resulted in delays to placing projects on contract. With projects experiencing delays of several months in decision making. 3. Legal, commercial, financial and security challenges leading to delays. 4. Affordability challenges presented by some projects have necessitated a resubmission and reduction in scope to meet Affordability targets. 5. The new design and build contracting process has taken projects and suppliers longer than envisaged to navigate through the complex process. The above has resulted in project schedules being updated, changing funding profiles into future years.","wholeLifeCost":5949.19,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) increased from £6376.29M to £6385.83M. This is primarily due to the following factors. 1. The Defence Estate Optimisation budget has remained stable throughout FY25/26. The delay to the Defence Investment Plan read out has led to the portfolio to hold within its budget however, an increase in the while life costs is now forecast. 2. Options have been presented to continue to deliver to the current approved Whole Life Cost estimates, including a potential reduction in funding should the Defence Investment Plan conclude as such.","benefits":13085.8,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 21281.95. This is primarily due to the following factors. The Defence Estate Optimisation benefits remained steady as per V13. Following the Defence Implementation Plan outcome we expect to see some movement dependent on the settlement.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors. 1. The Delivery Confidence Assessment rating at the end of the financial year remains at AMBER, reflecting the complexity and long timeline of the Portfolio. Ongoing engagement with…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 31/03/2041.","narrativeClaimKind":null}],"previous":{"id":"MOD_0114_1718-Q1","year":2025,"name":"DEFENCE ESTATE OPTIMISATION","department":"MoD","category":"Military Capability","description":"Defence Estate Optimisation Portfolio is a long-term investment of £5.1Bn to modernise the defence estate. It is an ambitious portfolio of construction activity, unit and personnel moves, and site disposals that will deliver a better structured, modern, and more sustainable estate to support military capability.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Project's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER, compared with the Infrastructure and Projects Authority's assessment last year of AMBER. This is due to the following factors. Compared to financial year 23/24-Q4, the NISTA Delivery Confidence Assessment rating at 24/25-Q4 remained at Amber. This is primarily due to the following factors: The programme's complexity and long timeline. Close monitoring of this suite of activities continues and is subject to a governance structure based around central Finance Military Capability management that is working well and supports strong working relationships while providing a defence wide perspective and is a key driver for the current and future success. The Portfolio is now in the delivery phase, successfully implementing the Contract Permissioning Group, designed to improve the efficiency and pace of approvals, enabling a reduction in standard approvals timing to 5-weeks. This framework will reduce the procurement timelines for projects by up to 18 months.","startDate":"2016-09-30","endDate":"2041-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2041.","fyBaseline":213.53,"fyForecast":193.56,"fyVariance":9.35,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The Defence Estate Optimisation in year variance, an overall underspend against its issued budget. This is due to the following main drivers: 1. The introduction of additional spending controls and lack of resource within commercial function has resulted in delays to placing projects on contract. 2. Additionally there have been legal, commercial and security challenges leading to delays. 3. The new design and build contracting process has taken projects and suppliers longer than envisaged to navigate through the complex process. 4. Affordability challenges presented by some projects have necessitated a resubmission and reduction in scope to meet Affordability targets. This has resulted in project schedules being updated, changing funding profiles into future years.","wholeLifeCost":6376.29,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 5208 to 6376. This is primarily due to the following factors. The Defence Estate Optimisation budgets have been realigned to V13 from V12 baseline. This has been endorsed by the Portfolio Board, resulting in increased Whole Life Total costs. This is partly due to additional spend controls, with initial projects and suppliers taking additional time adapting to the complexities of the new design and build contract process leading to further delays. Project costs for some sites have matured and been updated by the project teams as they were initially based on early estimates, leading to new cost models and increased scope due to refined stakeholder needs. Recent economic challenges like rising material, inflation, and labour costs have placed a further strain on the portfolio. Committing to evolving standards like Net Zero and carbon savings has compounded the case further.","benefits":21281.95,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 17656 to 21281. This is primarily due to the following factors.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Scope & requirements"],"evidenceExcerpt":"The Project's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER, compared with the Infrastructure and Projects Authority's assessment last year of AMBER. This is due to the following factors. Compared to financial year 23/24-Q4, the NISTA Delivery Confidence Assessment rating at 24/25-Q4 remained at Amber. This is primarily due to the following…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2041.","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":0,"attentionScore":33,"attentionReasons":["Current published delivery confidence is Amber","In-year forecast variance is +47.6%"]},{"id":"HO_0016_1213-Q1","year":2026,"name":"EMERGENCY SERVICES MOBILE COMMUNICATIONS","department":"HO","category":"Information and Communications Technology (ICT)","description":"The Programme aims to replace Airwave, the current mobile communications service used by the 3 Emergency Services and other public safety users. The new service is called the 'Emergency Services Network' (ESN) and will operate over a 4G LTE commercial mobile network, enhanced to meet the public safety requirements for coverage, functionality, availability and security.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at AMBER after the NISTA Gate 0 review in November 2025.","startDate":"2011-06-01","endDate":null,"scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same.","fyBaseline":1022.78,"fyForecast":512.06,"fyVariance":49.93,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors: 1. Core Costs –The financial year baseline contains all costs (core, non-core, and legacy) related to the programme. Core programme costs are apportioned by agreed Memorandum of Understanding (MoU) percentages for the relevant Funding Sponsor Bodies (FSBs) to make their contribution. The Financial Year Forecast contains only the net core costs borne by the Home Office. 2. Non-Core Costs – Non-Core Costs are borne directly by individual User Organisations and so, whilst they are modelled in the Financial Year Baseline, they are not all captured in the Financial Year Forecast. 3. Awarding of Major Contracts – The baseline is taken from the most recent approved business case, endorsed by HMT/CST on 14 November 2024, since which 2 significant contracts have been placed. Though these contracts have not greatly changed the whole life cost, they have resulted in costs being re-profiled.","wholeLifeCost":18139.58,"costNarrative":"Compared to financial year 24/25-Q4, the projects departmentally agreed Whole Life Cost at 25/26 remained at £19,181m. This is due to them being based on the same 2024 business case. An updated business case which would amend these whole life cost figures is still awaiting final Treasury approval but will be reflected in future submissions.","benefits":3723.69,"benefitsNarrative":"The Programme's departmentally agreed benefits at 2025/26-Q4 remained at £2,350 million (PV) over 19 years. This remains identical to financial year 2024/25-Q4. This is due to the 2025/26 PBC not yet having Chief Secretary to HM Treasury clearance. Please note the 2025/26 PBC has been cleared by Home Office Investment Committee following Funding Sponsor Bodies clearance. It has also obtained clearance from HM Treasury / NISTA.","themes":["Cost & funding","Approvals & decisions","Governance & assurance","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at AMBER after the NISTA Gate 0 review in November 2025. Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same.","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same.","narrativeClaimKind":null,"history":[{"id":"HO_0016_1213-Q1","year":2020,"name":"Emergency Services Mobile Communications Programme (ESMCP)","department":"HO","category":"Infrastructure and Construction","description":"Aims to replace the mobile communications service used by the three Emergency Services and other public safety users with an Emergency Services Network (ESN).","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber/Red, which has not changed since last year�s Q2 1819 Amber/Red, due primarily to the following factors; - The Emergency Services Mobile Communication Programme (ESMCP) has been reset and an incremental delivery of Emergency Services Network (ESN) was introduced. This was in response to continuing challenges with delivery and lack of user confidence. To proceed with the accepted ESN�s phased delivery approach, it was necessary to update commercial arrangements with suppliers. - The programme has made considerable progress delivering ESN technology specifically in: - ESN Direct 1, the first push to talk product - ESN Connect, the data product - ESN Assure 1.1, the coverage measurement product Since the Q2 1920 (30th September 2019) Amber/Red IPA DCA, the following primary project actions have impacted the original Q2 IPA DCA; - The Programme is working through its revised schedule and has successful launched new planned products. Lessons have been learnt and they have been taken into account with regards to the integrated programme plan. The other core programme products will be delivered over the course of 2020 and 2021. - Significant progress has been made with a number of related projects meaning that the cost of the technical solution is considerably clearer, and with the plan being refined. Work continues with users to assess the length of time they need to transition to ESN. The programme has worked closely with the Independent Assurance Panel to identify barriers to roll out of the solution and with users to incorporate the insights of the panel's challenges in user plans. - Once the Integrated Programme Plan is re-baselined, the financial model will be updated to take account of the current and forward position of the programme which will then refreshed Programme Business Case (PBC) due Q2 2020. With regards to COVID-19 the programme is working to preserve the critical path as far as possible.","startDate":"2011-06-01","endDate":"2022-12-31","scheduleNarrative":"The scheduled baseline project end date at Q2 1920 (30th September 2019) is 31/12/22, has lengthened by 730 days since last year's Q2 1819 date of 31/12/20, due primarily to the following factors; - The programme under went an extensive review and an incremental delivery of ESN was introduced. The review also included work to assess the length of time users needed to transition from the current Airwave service to ESN. Since the Q2 1920 (30th September 2019) baseline project end date of 31/12/22, the following non-project operating environment activities have impacted the original Q2 baseline project end date; - With regards to COVID-19, roll out of ESN in the underground and remote site mast builds are being impacted. However, the programme is working to preserve the critical path as far as possible. Since the Q2 1920 (30th September 2019) baseline project end date of 31/12/22, the following primary project actions have impacted the original Q2 baseline project end date; - An updated Programme Business Case is planned for Q2 2020 to reflect the revised programme delivery plans and provide greater certainty around the National Shutdown date for Airwave of 31 December 2022. - The programme has worked to align the plan to the budget available from the 20-21 top slice, with a view to phasing spend but hold to the programme's critical path.","fyBaseline":817.0,"fyForecast":817.0,"fyVariance":0.0,"varianceNarrative":"Budget variance less than 5%","wholeLifeCost":9521.92,"costNarrative":"The baseline Whole Life Cost at Q2 1920 (30th September 2019) is �9,521.92 m, has increased by �4463.29 m since last year's Q2 1819 (�m) baseline Whole Life Cost of �5,058.63 m, due primarily to the following factors; - The stated Whole Life Cost increase includes the impact of an extension to the evaluation period from 2031/32 to 2036/37 which adds an additional five years of cost to the Whole Life Costs. - Costs now include an extended period before the legacy Airwave network is assumed to be shutdown. Legacy costs, a subset of the Whole Life Costs quoted, are included until 31/12/2023. - Further cost increases were due to higher cost of ESN devices, coverage on London Underground, resource costs to cover extended project timelines, core contract updates and additional contingencies costs. Since the Q2 1920 (30th September 2019) �9,521.92 m baseline Whole Life Cost, the following non-project operating environment activities have impacted the original baseline Q2 Whole Life Cost; - Whilst the impact of COVID-19 is yet to be determined, it is expected to adversely impact on a number of areas of the Whole Life Cost, through possible schedule delays to operational evaluation and deployment plans. Since the Q2 1920 (30th September 2019) �9,521.92 m baseline Whole Life Cost, the following primary project actions have impacted the original Q2 baseline Whole Life Cost; - Work is ongoing to update the assessment of costs for operationally acceptable resilience and coverage in critical operational locations - Deployment planning is being refined to provide an updated assessment of the costs associated with mobilisation and transition activities.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Technical & integration"],"evidenceExcerpt":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber/Red, which has not changed since last year�s Q2 1819 Amber/Red, due primarily to the following factors; - The Emergency Services Mobile Communication Programme (ESMCP) has been reset and an incremental delivery of Emergency Services Network (ESN) was introduced.…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2020","sourceLabel":"IPA Annual Report 2019-20","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The scheduled baseline project end date at Q2 1920 (30th September 2019) is 31/12/22, has lengthened by 730 days since last year's Q2 1819 date of 31/12/20, due primarily to the following factors; - The programme under went an extensive review and an incremental delivery of ESN was introduced. The review also included work to assess the length of time users needed to transition from the current Airwave service to ESN. Since the Q2 1920 (30th September 2019) baseline project end date of 31/12/22, the following non-project operating environment activities have impacted the original Q2 baseline project end date; - With regards to COVID-19, roll out of ESN in the underground and remote site mast builds are being impacted. However, the programme is working to preserve the critical path as far as possible. Since the Q2 1920 (30th September 2019) baseline project end date of 31/12/22, the following primary project actions have impacted the original Q2 baseline project end date; - An updated Programme Business Case is planned for Q2 2020 to reflect the revised programme delivery plans and provide greater certainty around the National Shutdown date for Airwave of 31 December 2022. - The programme has worked to align the plan to the budget available from the 20-21 top slice, with a view to phasing spend but hold to the programme's critical path.","narrativeClaimKind":null},{"id":"HO_0016_1213-Q1","year":2021,"name":"Emergency Services Mobile Communications Programme (ESMCP)","department":"HO","category":"Infrastructure and Construction","description":"Emergency Services Mobile Communications Programme (ESMCP) is a cross government programme to deliver the new Emergency Services Network (ESN) critical communications system; replacing the current technology Airwave. ESN will transform emergency services' communications, by moving away from the largely 'voice only' proprietary and legacy Airwave radio system to a new combined voice and data service that leverages off-the-shelf technology and reuses commercial mobile telephone networks. Enhancements exist to prioritise emergency service calls above regular commercial traffic on the mobile network.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber/red. This is primarily due to the following factors: The Amber/Red rating reflects that the Full Business Case (FBC) is being collaboratively re-worked with Senior Users in readiness for approval in summer 2021. In conjunction with the revision of the FBC, a priority focus is engagement with suppliers to ensure the delivery plan meets user requirements. The new full-time Senior Responsible Owner (SRO) is working with the programme to gain support with Senior Stakeholders and amongst the user communities. User engagement continues with a full engagement plan developed to increase user confidence.","startDate":"2011-06-01","endDate":"2024-11-19","scheduleNarrative":"Compared to financial year 19/20-Q2, the project's end-date increased from 31 December 2022 to 19 November 2024 . This is primarily due to the following factors: A programme re-plan is underway and the programme is updating its FBC in conjunction with the service users for consideration and approval in summer 2021. A key aspect of this will be ensuring that the rollout schedule is technically deliverable, acceptable to service users and delivers value for money at an acceptable level of risk.","fyBaseline":876.93,"fyForecast":876.93,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":11198.84,"costNarrative":"Compared to financial year 19/20-Q2, the projects Baseline Whole Life Cost increased from �9521.92m to �11198.84m. This is primarily due to the following factors: Programme re-plan underway in accordance with the revision of the FBC which has seen costs increase. Reporting of the Whole Life Costs will take place once the revised FBC has been approved.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber/red. This is primarily due to the following factors: The Amber/Red rating reflects that the Full Business Case (FBC) is being collaboratively re-worked with Senior Users in readiness for approval in summer 2021. In conjunction…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 19/20-Q2, the project's end-date increased from 31 December 2022 to 19 November 2024 . This is primarily due to the following factors: A programme re-plan is underway and the programme is updating its FBC in conjunction with the service users for consideration and approval in summer 2021. A key aspect of this will be ensuring that the rollout schedule is technically deliverable, acceptable to service users and delivers value for money at an acceptable level of risk.","narrativeClaimKind":null},{"id":"HO_0016_1213-Q1","year":2022,"name":"Emergency Services Mobile Communications Programme (ESMCP)","department":"HO","category":"Infrastructure and Construction","description":"Emergency Services Mobile Communications Programme (ESMCP) is a cross government programme to deliver the new Emergency Services Network (ESN) critical communications system; replacing the current technology Airwave. ESN will transform emergency services' communications, by moving away from the largely 'voice only' proprietary and legacy Airwave radio system to a new combined voice and data service that leverages off-the-shelf technology and reuses commercial mobile telephone networks. Enhancements exist to prioritise emergency service calls above regular commercial traffic on the mobile network.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 decreased from Amber/red to Amber. A Full Business Case (FBC) was approved by Her Majesty's Treasury in August 2021. The delivery plan is being collaboratively developed to meet user requirements. The full-time Senior Responsible Owner (SRO) is very actively working with the programme and has strong support from Senior Stakeholders and from amongst the wider user communities. A full engagement plan has been developed to increase user confidence.","startDate":"2011-06-01","endDate":"2026-12-31","scheduleNarrative":"Compared to 2021-Q4, your project end-date increased from 19 NOV 2024 to 31 DEC 2026 . This is primarily due to the following factors: An update of the Integrated Programme Plan (referred to as version 5 / 6) will be developed through April 2022 following conclusion of the re-lotting activity. This will then go through Governance for any decisions impacting schedule, scope or cost culminating in a Major Projects Review Group during Summer / Autumn 2022.","fyBaseline":1024.03,"fyForecast":1024.03,"fyVariance":0.0,"varianceNarrative":"The budget variance is inferior or equal to 5%.","wholeLifeCost":12026.0,"costNarrative":"Compared to2021-Q4, the projects Baseline Whole Life Cost increased from 11198.84 (£m) to 12026.34 (£m). This is primarily due to the following factors: These figures reconcile to the source data from the current Finance model, the main difference is in the Capital DEL recurring costs, which is an error carried over from a previous Financial Model version before it was refreshed and this has now been rectified in this report.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 decreased from Amber/red to Amber. A Full Business Case (FBC) was approved by Her Majesty's Treasury in August 2021. The delivery plan is being collaboratively developed to meet user requirements. The full-time Senior Responsible…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to 2021-Q4, your project end-date increased from 19 NOV 2024 to 31 DEC 2026 . This is primarily due to the following factors: An update of the Integrated Programme Plan (referred to as version 5 / 6) will be developed through April 2022 following conclusion of the re-lotting activity. This will then go through Governance for any decisions impacting schedule, scope or cost culminating in a Major Projects Review Group during Summer / Autumn 2022.","narrativeClaimKind":null},{"id":"HO_0016_1213-Q1","year":2023,"name":"Emergency Services Mobile Communications Programme (ESMCP)","department":"HO","category":"Infrastructure and Construction","description":"Emergency Services Mobile Communications Programme (ESMCP) is a cross government programme to deliver the new Emergency Services Network (ESN) critical communications system; replacing the current technology Airwave. ESN will transform emergency services' communications, by moving away from the largely 'voice only' proprietary and legacy Airwave radio system to a new combined voice and data service that leverages off-the-shelf technology and reuses commercial mobile telephone networks. Enhancements exist to prioritise emergency service calls above regular commercial traffic on the mobile network.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 decreased from Amber to Red. This is primarily due to the following factors. The Programme has closed most of the recommendations from its last Independent Project Assurance Review (PAR) in January 2023. A review of progress against the January 2023 PAR actions is being undertaken in April 2023, followed by a session with the Major Programme Review Group (MPRG) on 21 April 2023. The programme have updated their commercial strategy, and are working through the procurement, governance and compliance for the contracts. Actions are underway to address the other outstanding PAR recommendations relating to skills, resourcing and security.","startDate":"2011-06-01","endDate":"2026-12-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2026-12-31. This is primarily due to the following factors. ESMCP is updating its Full Business Case (FBC) to gain endorsement on the direction of travel and agree the delivery timetable and costs to complete the programme.Furthermore, with a new supplier expected to be procured in 2024, our forecasts for completing the transition from Airwave to ESN and then the shutdown date of Airwave is yet to be confirmed.","fyBaseline":890.34,"fyForecast":728.74,"fyVariance":-18.0,"varianceNarrative":"The budget variance exceeds 5%. The overall forecast underspend is mostly driven by a change in Programme delivery plans and the exit of a key supplier. Some activities identified that could be paused/delayed during the substantial shift in the commercial arrangements and re-procurement, along with coverage build re-plans. These underspends and deferred activities are moving costs and timelines to the right. The impact will be reflected in the next iteration of the Business case.","wholeLifeCost":11263.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 decreased from 12026m. to 11263m. This is primarily due to the following factors. The whole Life budget cost is based on the last approved full business case July 21. Whole Life cost include ESN programme, ongoing run and legacy Airwave costs. The full business case is currently been updated.","benefits":3746.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 3746m. The project's departmental-agree monetised benefits at 22/23-Q4 is 3746m.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 decreased from Amber to Red. This is primarily due to the following factors. The Programme has closed most of the recommendations from its last Independent Project Assurance Review (PAR) in January 2023. A review of progress against…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2026-12-31. This is primarily due to the following factors. ESMCP is updating its Full Business Case (FBC) to gain endorsement on the direction of travel and agree the delivery timetable and costs to complete the programme.Furthermore, with a new supplier expected to be procured in 2024, our forecasts for completing the transition from Airwave to ESN and then the shutdown date of Airwave is yet to be confirmed.","narrativeClaimKind":null},{"id":"HO_0016_1213-Q1","year":2024,"name":"Emergency Services Mobile Communications Programme (ESMCP)","department":"HO","category":"Infrastructure and Construction","description":"The Programme aims to replace the mobile communications service used by the 3 Emergency Services and other public safety users. This will be achieved through the introduction of a new service called the 'Emergency Services Network' (ESN), operating over a 4G LTE commercial mobile network enhanced to meet the public safety requirements for coverage, functionality, availability and security.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Red. This is primarily due to the following factors. The Programme has closed most of the recommendations from the last Cabinet Office led independent Project Assurance Reviews (PAR) carried out in January and followed-up in April 2023. A meeting with the Cabinet Office Major Projects Review Group (MPRG) took place in May 2023 where the Programme's Commercial Strategy was endorsed. The programme is working through the re-procurement of the User Services contract, and the extension to the Mobile Services contract. Actions are underway to prepare for the next PAR and the necessary governance and approvals following completion of the commercial work, later this year.","startDate":"2011-06-01","endDate":"2026-12-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2026-12-31. This is primarily due to the following factors. ESMCP is updating it's Programme Business Case (PBC) to gain further endorsement on the direction of travel and agree the delivery timetable and costs to complete the programme. Furthermore, with a new User Services supplier expected to be procured later this year, our forecasts for completing the transition from Airwave to ESN and then the shutdown date for Airwave is yet to be confirmed.","fyBaseline":718.32,"fyForecast":614.39,"fyVariance":-14.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The overall underspend is mostly driven by a change in Programme delivery plans since the 2021 FBC, including the exit of a key supplier and timing of re-procurements, along with coverage build re-plans. These Programme underspends and deferred activities are moving costs and timelines to the right. The variance also includes the impact of the Competition and Markets Authority (CMA) charge control on Airwave prices.","wholeLifeCost":11263.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 remained at 11263m. This is primarily due to the following factors. The Whole life budget cost is based on the last approved full business case July 21. Whole life costs include ESN programme, ongoing run and legacy Airwave costs. The full business case is currently been updated.","benefits":3682.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 2324-Q4 decreased from 3746m. to 3682m.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Red. This is primarily due to the following factors. The Programme has closed most of the recommendations from the last Cabinet Office led independent Project Assurance Reviews (PAR) carried out in January and followed-up…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2026-12-31. This is primarily due to the following factors. ESMCP is updating it's Programme Business Case (PBC) to gain further endorsement on the direction of travel and agree the delivery timetable and costs to complete the programme. Furthermore, with a new User Services supplier expected to be procured later this year, our forecasts for completing the transition from Airwave to ESN and then the shutdown date for Airwave is yet to be confirmed.","narrativeClaimKind":null},{"id":"HO_0016_1213-Q1","year":2025,"name":"EMERGENCY SERVICES MOBILE COMMUNICATIONS","department":"HO","category":"ICT","description":"The Emergency Services Network (ESN) will enable fast, safe and secure voice, video and data across a 4G/5G network, giving first responders immediate access to life-saving data, images and information in live situations and emergencies on the frontline. ESN replaces the current Terrestrial Trunked Radio (TETRA) system, the Airwave Service, which Great Britain’s three emergency services (3ES) and related first responder agencies depend on for mission-critical voice communications. ESN is being delivered by the Emergency Services Mobile Communications Programme (ESMCP). The global consensus towards using 4G/5G technologies for such Public Safety Communications Services, twinned with the nationwide roll-out of such technologies by commercial operators since Airwave was commissioned, opened an opportunity which ESN is exploiting; namely, to use and supplement commercial 4G/5G. Continued TETRA/Airwave use, as with use of any aging technology, is becoming riskier. As ESMCP’s Independent Assurance Panel (IAP) stated at the Public Accounts Committee (PAC) hearing on 26 April 2023, “… the technology ESN will utilise is the correct direction of travel, because Airwave and the TETRA service will become increasingly obsolete and ever-more expensive to maintain.”","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from RED to AMBER. This is primarily due to the following factors‚ ESMCP has undertaken Project Assurance Reviews (PAR), throughout its lifecycle, the last was conducted in June 2024, as part of the 2024 Programme Business Case (PBC) governance and approvals process. The June 2024 PAR report initially gave the programme a RED rating, due solely to the risk of legal challenge from Motorola, commenting that in all other areas the programme had made excellent progress. The report made a number of recommendations to manage the risk, ahead of publication of the Voluntary Ex-Ante Transparency Notice (VEAT) for the Mobile Services direct award. Programme senior leaders took the recommended actions and the VEAT was issued on 31 July 2024, without challenge. At the follow-up Cabinet Office Assurance of Action Plan (AAP) review, on 9 September 2024, the review team recognised the exceptional progress the programme had made to mitigate the risk of legal challenge, recommending an improved AMBER rating, which allowed the Major Projects Review Group (MPRG) meeting to take place on 26 September 2024. MPRG accepted the recommended AMBER rating, approved the PBC, both Mobile Services [MS] and User Services [US] contract awards which led to the Chief Secretary of the Treasury’s approval of the PBC and MS/US contract awards, which was endorsed on 14 November 2024.","startDate":"2011-06-01","endDate":null,"scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/12/2026 to 01/05/2030. This is primarily due to the following factors‚ During 2021, delays in the delivery of the Motorola services under the User Services contract meant that full transition was no longer possible before the end of December 2022. Consequently, during 2021 the Emergency Services Mobile Communications Programme (ESMCP) extended the Airwave contracts from the scheduled National Shut Down Target Sate (NSDTD) of 31 December 2022 to a target date of 31 December 2026. At the time it was believed that this extension would ensure continuity of service and enable sufficient time to transition from Airwave to the Emergency Services Network (ESN). With continued delays in the delivery of the Lot 2 contract during the early part of 2022, Motorola decided it did not want to extend the provision of Lot 2 beyond 2024. In April 2022, Motorola approached ESMCP to explore the opportunity of a mutually agreed full termination of Lot 2, which was agreed on 19 December 2022. These delivery delays and Motorola’s early exit led to the requirement to re-procure the User Service contract. In late 2024 a new User Services contract was successfully awarded IBM, leading to a new delivery plan and revised target dates for Airwave Shutdown (ASD) and transition complete at the end of 2029, affecting programme closure, now 01 May 2030.","fyBaseline":349.74,"fyForecast":349.74,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%. The programme underspent compared to its 2024/25 cost baseline due to the revised start dates of the User Services and Mobile Services contracts in late 2024.","wholeLifeCost":19180.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 11263 to 19180. This is primarily due to the following factors‚ • Evaluation period of the project was extended from FY36/37 to FY43/44. • Core Costs increasing due to higher inflation, increased coverage build, replacement of User Services Provider and additional capital refresh costs. • Airwave Shut Down is now targeted by 31 Dec 2029","benefits":1343.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) decreased from 3682 to 1343. This is primarily due to the following factors‚ The Benefits submission of £5.644bn is comprised of £2.711bn for Government Cash-releasing and £2.932bn for Wider UK Public Economic. Government Cash Releasing is the difference between the programme continuing with Airwave under Option 1 and pursuing the preferred Option under Option 2. Wider UK Public Economic is the total ESN benefits, mostly comprised of the Economic benefit to Ambulance ESN 999 calls and additional mobile coverage for the public.","themes":["Commercial & supply chain","Cost & funding","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from RED to AMBER. This is primarily due to the following factors‚ ESMCP has undertaken Project Assurance Reviews (PAR), throughout its lifecycle, the last was conducted in June 2024, as part of the 2024 Programme Business…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/12/2026 to 01/05/2030. This is primarily due to the following factors‚ During 2021, delays in the delivery of the Motorola services under the User Services contract meant that full transition was no longer possible before the end of December 2022. Consequently, during 2021 the Emergency Services Mobile Communications Programme (ESMCP) extended the Airwave contracts from the scheduled National Shut Down Target Sate (NSDTD) of 31 December 2022 to a target date of 31 December 2026. At the time it was believed that this extension would ensure continuity of service and enable sufficient time to transition from Airwave to the Emergency Services Network (ESN). With continued delays in the delivery of the Lot 2 contract during the early part of 2022, Motorola decided it did not want to extend the provision of Lot 2 beyond 2024. In April 2022, Motorola approached ESMCP to explore the opportunity of a mutually agreed full termination of Lot 2, which was agreed on 19 December 2022. These delivery delays and Motorola’s early exit led to the requirement to re-procure the User Service contract. In late 2024 a new User Services contract was successfully awarded IBM, leading to a new delivery plan and revised target dates for Airwave Shutdown (ASD) and transition complete at the end of 2029, affecting programme closure, now 01 May 2030.","narrativeClaimKind":null},{"id":"HO_0016_1213-Q1","year":2026,"name":"EMERGENCY SERVICES MOBILE COMMUNICATIONS","department":"HO","category":"Information and Communications Technology (ICT)","description":"The Programme aims to replace Airwave, the current mobile communications service used by the 3 Emergency Services and other public safety users. The new service is called the 'Emergency Services Network' (ESN) and will operate over a 4G LTE commercial mobile network, enhanced to meet the public safety requirements for coverage, functionality, availability and security.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at AMBER after the NISTA Gate 0 review in November 2025.","startDate":"2011-06-01","endDate":null,"scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same.","fyBaseline":1022.78,"fyForecast":512.06,"fyVariance":49.93,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors: 1. Core Costs –The financial year baseline contains all costs (core, non-core, and legacy) related to the programme. Core programme costs are apportioned by agreed Memorandum of Understanding (MoU) percentages for the relevant Funding Sponsor Bodies (FSBs) to make their contribution. The Financial Year Forecast contains only the net core costs borne by the Home Office. 2. Non-Core Costs – Non-Core Costs are borne directly by individual User Organisations and so, whilst they are modelled in the Financial Year Baseline, they are not all captured in the Financial Year Forecast. 3. Awarding of Major Contracts – The baseline is taken from the most recent approved business case, endorsed by HMT/CST on 14 November 2024, since which 2 significant contracts have been placed. Though these contracts have not greatly changed the whole life cost, they have resulted in costs being re-profiled.","wholeLifeCost":18139.58,"costNarrative":"Compared to financial year 24/25-Q4, the projects departmentally agreed Whole Life Cost at 25/26 remained at £19,181m. This is due to them being based on the same 2024 business case. An updated business case which would amend these whole life cost figures is still awaiting final Treasury approval but will be reflected in future submissions.","benefits":3723.69,"benefitsNarrative":"The Programme's departmentally agreed benefits at 2025/26-Q4 remained at £2,350 million (PV) over 19 years. This remains identical to financial year 2024/25-Q4. This is due to the 2025/26 PBC not yet having Chief Secretary to HM Treasury clearance. Please note the 2025/26 PBC has been cleared by Home Office Investment Committee following Funding Sponsor Bodies clearance. It has also obtained clearance from HM Treasury / NISTA.","themes":["Cost & funding","Approvals & decisions","Governance & assurance","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at AMBER after the NISTA Gate 0 review in November 2025. Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same.","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same.","narrativeClaimKind":null}],"previous":{"id":"HO_0016_1213-Q1","year":2025,"name":"EMERGENCY SERVICES MOBILE COMMUNICATIONS","department":"HO","category":"ICT","description":"The Emergency Services Network (ESN) will enable fast, safe and secure voice, video and data across a 4G/5G network, giving first responders immediate access to life-saving data, images and information in live situations and emergencies on the frontline. ESN replaces the current Terrestrial Trunked Radio (TETRA) system, the Airwave Service, which Great Britain’s three emergency services (3ES) and related first responder agencies depend on for mission-critical voice communications. ESN is being delivered by the Emergency Services Mobile Communications Programme (ESMCP). The global consensus towards using 4G/5G technologies for such Public Safety Communications Services, twinned with the nationwide roll-out of such technologies by commercial operators since Airwave was commissioned, opened an opportunity which ESN is exploiting; namely, to use and supplement commercial 4G/5G. Continued TETRA/Airwave use, as with use of any aging technology, is becoming riskier. As ESMCP’s Independent Assurance Panel (IAP) stated at the Public Accounts Committee (PAC) hearing on 26 April 2023, “… the technology ESN will utilise is the correct direction of travel, because Airwave and the TETRA service will become increasingly obsolete and ever-more expensive to maintain.”","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from RED to AMBER. This is primarily due to the following factors‚ ESMCP has undertaken Project Assurance Reviews (PAR), throughout its lifecycle, the last was conducted in June 2024, as part of the 2024 Programme Business Case (PBC) governance and approvals process. The June 2024 PAR report initially gave the programme a RED rating, due solely to the risk of legal challenge from Motorola, commenting that in all other areas the programme had made excellent progress. The report made a number of recommendations to manage the risk, ahead of publication of the Voluntary Ex-Ante Transparency Notice (VEAT) for the Mobile Services direct award. Programme senior leaders took the recommended actions and the VEAT was issued on 31 July 2024, without challenge. At the follow-up Cabinet Office Assurance of Action Plan (AAP) review, on 9 September 2024, the review team recognised the exceptional progress the programme had made to mitigate the risk of legal challenge, recommending an improved AMBER rating, which allowed the Major Projects Review Group (MPRG) meeting to take place on 26 September 2024. MPRG accepted the recommended AMBER rating, approved the PBC, both Mobile Services [MS] and User Services [US] contract awards which led to the Chief Secretary of the Treasury’s approval of the PBC and MS/US contract awards, which was endorsed on 14 November 2024.","startDate":"2011-06-01","endDate":null,"scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/12/2026 to 01/05/2030. This is primarily due to the following factors‚ During 2021, delays in the delivery of the Motorola services under the User Services contract meant that full transition was no longer possible before the end of December 2022. Consequently, during 2021 the Emergency Services Mobile Communications Programme (ESMCP) extended the Airwave contracts from the scheduled National Shut Down Target Sate (NSDTD) of 31 December 2022 to a target date of 31 December 2026. At the time it was believed that this extension would ensure continuity of service and enable sufficient time to transition from Airwave to the Emergency Services Network (ESN). With continued delays in the delivery of the Lot 2 contract during the early part of 2022, Motorola decided it did not want to extend the provision of Lot 2 beyond 2024. In April 2022, Motorola approached ESMCP to explore the opportunity of a mutually agreed full termination of Lot 2, which was agreed on 19 December 2022. These delivery delays and Motorola’s early exit led to the requirement to re-procure the User Service contract. In late 2024 a new User Services contract was successfully awarded IBM, leading to a new delivery plan and revised target dates for Airwave Shutdown (ASD) and transition complete at the end of 2029, affecting programme closure, now 01 May 2030.","fyBaseline":349.74,"fyForecast":349.74,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%. The programme underspent compared to its 2024/25 cost baseline due to the revised start dates of the User Services and Mobile Services contracts in late 2024.","wholeLifeCost":19180.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 11263 to 19180. This is primarily due to the following factors‚ • Evaluation period of the project was extended from FY36/37 to FY43/44. • Core Costs increasing due to higher inflation, increased coverage build, replacement of User Services Provider and additional capital refresh costs. • Airwave Shut Down is now targeted by 31 Dec 2029","benefits":1343.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) decreased from 3682 to 1343. This is primarily due to the following factors‚ The Benefits submission of £5.644bn is comprised of £2.711bn for Government Cash-releasing and £2.932bn for Wider UK Public Economic. Government Cash Releasing is the difference between the programme continuing with Airwave under Option 1 and pursuing the preferred Option under Option 2. Wider UK Public Economic is the total ESN benefits, mostly comprised of the Economic benefit to Ambulance ESN 999 calls and additional mobile coverage for the public.","themes":["Commercial & supply chain","Cost & funding","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from RED to AMBER. This is primarily due to the following factors‚ ESMCP has undertaken Project Assurance Reviews (PAR), throughout its lifecycle, the last was conducted in June 2024, as part of the 2024 Programme Business…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/12/2026 to 01/05/2030. This is primarily due to the following factors‚ During 2021, delays in the delivery of the Motorola services under the User Services contract meant that full transition was no longer possible before the end of December 2022. Consequently, during 2021 the Emergency Services Mobile Communications Programme (ESMCP) extended the Airwave contracts from the scheduled National Shut Down Target Sate (NSDTD) of 31 December 2022 to a target date of 31 December 2026. At the time it was believed that this extension would ensure continuity of service and enable sufficient time to transition from Airwave to the Emergency Services Network (ESN). With continued delays in the delivery of the Lot 2 contract during the early part of 2022, Motorola decided it did not want to extend the provision of Lot 2 beyond 2024. In April 2022, Motorola approached ESMCP to explore the opportunity of a mutually agreed full termination of Lot 2, which was agreed on 19 December 2022. These delivery delays and Motorola’s early exit led to the requirement to re-procure the User Service contract. In late 2024 a new User Services contract was successfully awarded IBM, leading to a new delivery plan and revised target dates for Airwave Shutdown (ASD) and transition complete at the end of 2029, affecting programme closure, now 01 May 2030.","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":null,"attentionScore":33,"attentionReasons":["Current published delivery confidence is Amber","In-year forecast variance is +49.9%"]},{"id":"MOD_0144_2122-Q1","year":2026,"name":"GROUND BASED AIR DEFENCE (GBAD)","department":"MOD","category":"Military Capability","description":"The Land Ground Based Air Defence (GBAD) programme delivers a modern, integrated air defence capability to protect UK forces and critical assets against evolving air and missile threats. Structured through Capability Uplift Plans (CUPs), the programme balances immediate capability delivery with longer-term transformation. CUP 1 focuses on fielding “no regrets” capabilities already on contract, including enhancements to existing systems. CUP 2 seeks to deliver a more integrated and digitally-enabled force, improving lethality, survivability and interoperability with NATO partners. Future phases will explore further capability evolution, including emerging technologies and alternative force constructs. The programme brings together a range of industry partners, delivery organisations and stakeholders to deliver a coherent, layered defence system, underpinned by modern command and control and a data-centric approach to operations.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors. 1. Over the past 12 months, delivery confidence has remained Amber primarily due to challenges associated with the transition from early capability delivery into more complex programme integration. Increased cost pressures, particularly within elements of the short-range air defence capability, have raised affordability concerns against available funding. 2. In parallel, resource constraints across both the programme team and delivery organisations have impacted the pace of progress and contributed to schedule pressure. 3. Dependencies on wider Defence activity, including infrastructure and investment decisions, have also introduced uncertainty and limited the programme’s ability to progress at the required rate. 4. Collectively, these factors reflect the growing complexity of delivering an integrated, modernised air defence system, requiring continued alignment of funding, resource and dependencies to support future delivery confidence.","startDate":"2018-07-02","endDate":"2033-12-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 31/12/2033.","fyBaseline":239.41,"fyForecast":134.66,"fyVariance":43.75,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. 1. Defence financial challenges and internal spend commitment controls have led to a different spend profile to that initially envisaged. 2. Further complicated by unaffordable cost estimtes for BC 2 SHORAD capability that require furher review and mitigations.","wholeLifeCost":1454.95,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) decreased from £2967.59M to £1589.63M. This is due to the programme having undertaken a rebaselining exercise against a revised affordable envelope.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Delivery & schedule","Workforce & capability","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors. 1. Over the past 12 months, delivery confidence has remained Amber primarily due to challenges associated with the transition from early capability delivery into more complex programme…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 31/12/2033.","narrativeClaimKind":null,"history":[{"id":"MOD_0144_2122-Q1","year":2022,"name":"Ground Based Air Defence (GBAD)","department":"MOD","category":"Military Capability","description":"The Land Ground Based Air Defence programme will modernise the Army's air defence capabilities in the face of rapidly developing threats, and is a very high priority for the Army. This includes the development of an integrated layered air defence system comprising Small Air Targets and Short and Medium Range Air Defence, and technology that allows engagement of targets at optimum range and early air raid warning.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber. This is primarily due to the following factors: The Defence in a Competitive Age Command Paper (CP411) published in March 2021 confirmed the reprioritisation of vehicle fleets. This has resulted in the need to identify a new vehicular platform on which to mount the Short-Range Air Defence missile system.","startDate":"2018-07-02","endDate":"2033-12-30","scheduleNarrative":"The project end-date is 30 December 2033. This is primarily due to the following factors: The Programme entered the Government Major Projects Portfolio in Financial Year 2021/22, as such there is no baseline date recorded for March 21 for comparison.","fyBaseline":4.96,"fyForecast":4.87,"fyVariance":0.0,"varianceNarrative":"The budget variance is inferior or equal to 5%.","wholeLifeCost":1787.0,"costNarrative":"The projects Baseline Whole Life Cost is 1787.35 (£m). This is primarily due to the following factors: Army HQ has reviewed its funding profile; although this saw a small reduction in designated funding the Army element of the Programme is now affordable. A similar exercise is still required for the MOD Weapons Evaluation and Capability Assurance elements of the programme pending updated costs.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Workforce & capability"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber. This is primarily due to the following factors: The Defence in a Competitive Age Command Paper (CP411) published in March 2021 confirmed the reprioritisation of vehicle fleets. This has resulted in the need to identify a new vehicular platform on which to mount the…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project end-date is 30 December 2033. This is primarily due to the following factors: The Programme entered the Government Major Projects Portfolio in Financial Year 2021/22, as such there is no baseline date recorded for March 21 for comparison.","narrativeClaimKind":null},{"id":"MOD_0144_2122-Q1","year":2023,"name":"Ground Based Air Defence (GBAD)","department":"MOD","category":"Military Capability","description":"The Land Ground Based Air Defence programme will modernise the Army's air defence capabilities in the face of rapidly developing threats and is a very high priority for the Army. This includes the development of an integrated layered air defence system comprising Small Air Targets and Short and Medium Range Air Defence, and technology that allows engagement of targets at optimum range and early air raid warning.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. Resourcing issues which put the schedule at risk have improved, and the production of a revised programme roadmap has led to milestone adjustments. An incremental approach to capability delivery should present opportunities to realise some early benefits.","startDate":"2018-07-02","endDate":"2033-12-30","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2033-12-30. This is primarily due to the following factors. NA","fyBaseline":9.37,"fyForecast":8.07,"fyVariance":-14.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factor: Work relating to Land Ceptor is behind schedule and did not commence as planned in FY22/23","wholeLifeCost":2303.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 increased from 1787m. to 2303m. This is primarily due to the following factors. The programme is still in its Concept Phase and ahead of Outline Business Case and Full Business Case approvals. The scope of the programme, associated costings and budget provision is not yet fully defined and continues to mature. The Whole Life Cost is based at this stage on the budget for the next 10 years only (plus previous year expenditure) and, as such, the reported Whole Life Cost this year includes a budget for FY2032/33.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This programme does not report cashable benefits. Its aim is to provision the armed forces with the equipment and / or infrastructure required.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. Resourcing issues which put the schedule at risk have improved, and the production of a revised programme roadmap has led to milestone adjustments. An incremental…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2033-12-30. This is primarily due to the following factors. NA","narrativeClaimKind":null},{"id":"MOD_0144_2122-Q1","year":2024,"name":"Ground Based Air Defence (GBAD)","department":"MOD","category":"Military Capability","description":"The Land Ground Based Air Defence programme is striving to modernise Defence’s ground based air defence capabilities in the face of rapidly developing threats, and is very high priority for the Army. This includes the development of an integrated layered air defence system comprising countering Small Air Targets, Short and Medium Range Air Defence.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The programme has sustained progress in addressing recommendations of its IPA strategic review, including the resourcing of more programme staff, and the adoption of a more holistic approach to programme delivery, and a more realistic programme roadmap.","startDate":"2018-07-02","endDate":"2033-12-31","scheduleNarrative":"The project's end-date at 23/24-Q4 is scheduled to finish on 2033-12-30.","fyBaseline":61.77,"fyForecast":69.37,"fyVariance":12.304,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The perceived underspend for the GBAD programme is the result of significant delay in securing approval of Business Case 1 as submitted in November 2023.","wholeLifeCost":2237.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 decreased from 2303m. to 2237m. This is primarily due to the following factors. Financial reconciliation and refinement of the first two capability uplift packages (CUPs) during financial year 23/24 has resulted in a decrease to the programme’s WLC at Q4. Future CUPs were discussed as part of the Autumn 2023 Balance of Investment process where Army Headquarters agreed in principle to increase the funding for the overall programme, specifically to increase volumes of medium range and short range air defence systems, counter small Unmanned Aircraft Systems. The Army continues to review the programme’s funding profile in conjunction with the MOD Complex Weapons elements of the programme pending the MOD munition strategy and updated costs.","benefits":0.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 0m.","themes":["Cost & funding","Delivery & schedule","Workforce & capability","Approvals & decisions"],"evidenceExcerpt":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The programme has sustained progress in addressing recommendations of its IPA strategic review, including the resourcing of more programme staff, and the adoption of a more holistic approach to programme…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 23/24-Q4 is scheduled to finish on 2033-12-30.","narrativeClaimKind":null},{"id":"MOD_0144_2122-Q1","year":2025,"name":"GROUND BASED AIR DEFENCE (GBAD)","department":"MoD","category":"Military Capability","description":"The Land Ground Based Air Defence programme is striving to modernise Defence’s ground based air defence capabilities in the face of rapidly developing threats, and is very high priority for the Army. This includes the development of an integrated layered air defence system comprising of countering Small Air Targets, Short and Medium Range Air Defence. Reprioritisation of vehicle fleets has resulted in the need to identify a new vehicle on which to mount the Short-Range Air Defence missile system. A solution will not be achieved before the current out-of-service date of the in-service platform (Stormer) in December 2026. A such, it is very likely, that Stormer will be extended in-service for a short period until the preferRed option becomes available to mitigate a capability gap. Alternative pathways to deliver a base vehicle for the Short-Range Air Defence capability are being actively considered.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. Principal areas which have led to this delivery confidence were the resourcing of more programme staff, the adoption of a more holistic approach to programme delivery and a more realistic programme roadmap.","startDate":"2018-07-02","endDate":"2033-12-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/12/2033.","fyBaseline":203.08,"fyForecast":58.74,"fyVariance":71.07,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. Defence financial challenges and internal spend commitment controls have led to a different spend profile to that initially envisaged.","wholeLifeCost":2967.59,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 2237 to 2967. This is primarily due to the following factors. Increases to Short-Range Air Defence (SHORAD) and the relatively immaturity of some of the cost estimates that will be refined and revised up to and post OBC for each of the project lines.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Delivery & schedule","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. Principal areas which have led to this delivery confidence were the resourcing of more programme staff, the adoption of a more holistic approach to programme delivery and a more realistic programme…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/12/2033.","narrativeClaimKind":null},{"id":"MOD_0144_2122-Q1","year":2026,"name":"GROUND BASED AIR DEFENCE (GBAD)","department":"MOD","category":"Military Capability","description":"The Land Ground Based Air Defence (GBAD) programme delivers a modern, integrated air defence capability to protect UK forces and critical assets against evolving air and missile threats. Structured through Capability Uplift Plans (CUPs), the programme balances immediate capability delivery with longer-term transformation. CUP 1 focuses on fielding “no regrets” capabilities already on contract, including enhancements to existing systems. CUP 2 seeks to deliver a more integrated and digitally-enabled force, improving lethality, survivability and interoperability with NATO partners. Future phases will explore further capability evolution, including emerging technologies and alternative force constructs. The programme brings together a range of industry partners, delivery organisations and stakeholders to deliver a coherent, layered defence system, underpinned by modern command and control and a data-centric approach to operations.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors. 1. Over the past 12 months, delivery confidence has remained Amber primarily due to challenges associated with the transition from early capability delivery into more complex programme integration. Increased cost pressures, particularly within elements of the short-range air defence capability, have raised affordability concerns against available funding. 2. In parallel, resource constraints across both the programme team and delivery organisations have impacted the pace of progress and contributed to schedule pressure. 3. Dependencies on wider Defence activity, including infrastructure and investment decisions, have also introduced uncertainty and limited the programme’s ability to progress at the required rate. 4. Collectively, these factors reflect the growing complexity of delivering an integrated, modernised air defence system, requiring continued alignment of funding, resource and dependencies to support future delivery confidence.","startDate":"2018-07-02","endDate":"2033-12-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 31/12/2033.","fyBaseline":239.41,"fyForecast":134.66,"fyVariance":43.75,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. 1. Defence financial challenges and internal spend commitment controls have led to a different spend profile to that initially envisaged. 2. Further complicated by unaffordable cost estimtes for BC 2 SHORAD capability that require furher review and mitigations.","wholeLifeCost":1454.95,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) decreased from £2967.59M to £1589.63M. This is due to the programme having undertaken a rebaselining exercise against a revised affordable envelope.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Delivery & schedule","Workforce & capability","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors. 1. Over the past 12 months, delivery confidence has remained Amber primarily due to challenges associated with the transition from early capability delivery into more complex programme…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 31/12/2033.","narrativeClaimKind":null}],"previous":{"id":"MOD_0144_2122-Q1","year":2025,"name":"GROUND BASED AIR DEFENCE (GBAD)","department":"MoD","category":"Military Capability","description":"The Land Ground Based Air Defence programme is striving to modernise Defence’s ground based air defence capabilities in the face of rapidly developing threats, and is very high priority for the Army. This includes the development of an integrated layered air defence system comprising of countering Small Air Targets, Short and Medium Range Air Defence. Reprioritisation of vehicle fleets has resulted in the need to identify a new vehicle on which to mount the Short-Range Air Defence missile system. A solution will not be achieved before the current out-of-service date of the in-service platform (Stormer) in December 2026. A such, it is very likely, that Stormer will be extended in-service for a short period until the preferRed option becomes available to mitigate a capability gap. Alternative pathways to deliver a base vehicle for the Short-Range Air Defence capability are being actively considered.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. Principal areas which have led to this delivery confidence were the resourcing of more programme staff, the adoption of a more holistic approach to programme delivery and a more realistic programme roadmap.","startDate":"2018-07-02","endDate":"2033-12-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/12/2033.","fyBaseline":203.08,"fyForecast":58.74,"fyVariance":71.07,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. Defence financial challenges and internal spend commitment controls have led to a different spend profile to that initially envisaged.","wholeLifeCost":2967.59,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 2237 to 2967. This is primarily due to the following factors. Increases to Short-Range Air Defence (SHORAD) and the relatively immaturity of some of the cost estimates that will be refined and revised up to and post OBC for each of the project lines.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Delivery & schedule","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. Principal areas which have led to this delivery confidence were the resourcing of more programme staff, the adoption of a more holistic approach to programme delivery and a more realistic programme…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/12/2033.","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":0,"attentionScore":33,"attentionReasons":["Current published delivery confidence is Amber","In-year forecast variance is +43.8%"]},{"id":"DESNZ_0334_2324-Q3","year":2026,"name":"Hydrogen Allocation Round 1 (HAR1)","department":"DESNZ","category":"Infrastructure and Construction","description":"The first hydrogen allocation round (HAR1) offered both Hydrogen Production Business Model (HPBM) and Net Zero Hydrogen Fund (NZHF) support to first-of-a-kind electrolytic hydrogen projects. HAR1 aims to unlock private investment, accelerate early hydrogen deployment and support the growth of hydrogen supply chains, whilst contributing to long term decarbonisation and energy system resilience. HAR1 offered support to 11 projects, with the first project becoming operational in April 2026. The HPBM is designed to provide revenue support to low carbon hydrogen producers once their project is operational, helping them to overcome the operating cost gap between low carbon hydrogen and high carbon fossil fuels. Funding for the HPBM, confirmed at Budget 2024, will be exchequer funded until the introduction of the proposed Gas Shipper Obligation. The NZHF provides up to 20% capital expenditure (CAPEX) support for HAR 1 projects.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors: 11 Projects have signed contracts. Although 1 project withdrew (Whitelee), the remaining 10 projects continue to progress to either reach FID and subsequently COD or are imminently about to reach COD (HyMarnham April 2026). Remaining projects are expected to reach COD between August 2027 and August 2029 but this is due to external factors to DESNZ. These timeframes are also subject to projects individual circumstances and may change. There have been some projects requiring NZHF grant funding in the next financial year as opposed to 25/26 and relevant documentation has been completed to account for this. We are working with projects and LCCC to ensure DESNZ can support the continual progression of projects to reach COD.","startDate":"2022-07-20","endDate":"2042-06-30","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remains as 2042","fyBaseline":49.94,"fyForecast":4.83,"fyVariance":90.33,"varianceNarrative":"There is no variance to the HMT approved budget.","wholeLifeCost":2461.71,"costNarrative":"WLC are £2461.71m in Real Prices 24/25 as calculated by NISTA based on £2366m (DESNZ Real Prices Calendar Year 2023)","benefits":1336.98,"benefitsNarrative":"Benefits are £1366.98m in Real Prices 24/25 as calculated by NISTA based on £1285m (DESNZ Real Prices Calendar Year 2023)","themes":["Cost & funding","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors: 11 Projects have signed contracts. Although 1 project withdrew (Whitelee), the remaining 10 projects continue to progress to either reach FID and subsequently COD or are imminently…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remains as 2042","narrativeClaimKind":null,"history":[{"id":"DESNZ_0334_2324-Q3","year":2024,"name":"Hydrogen Allocation Round 1 (HAR1)","department":"DESNZ","category":"Infrastructure and Construction","description":"The first joint electrolytic hydrogen allocation round (HAR1) offers both Hydrogen Production Business Model (HPBM) and Net Zero Hydrogen Fund (NZHF) support to first-of-a-kind electrolytic hydrogen projects. The HPBM is designed to provide a subsidy to low carbon hydrogen producers, helping them to overcome the operating cost gap between low carbon hydrogen and high carbon fossil fuels otherwise consumed. HAR1 is the first opportunity for Government to demonstrate that it is delivering on the ambition for up to 10GW of hydrogen production capacity by 2030. If the UK loses this opportunity to signal support to the hydrogen economy, it will be difficult to meet the investment levels needed to reach our deployment ambitions and build a UK supply chain of skills and components ready for global export.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. All 11 projects announced in Dec-23 remain in the process. The counterparty - Low Carbon Contracts Company (LCCC) is expected to offer contracts to successful projects from Summer 2024. The HAR1 scheme was published on the subsidy control transparency database on 13/02, detailing the whole life costs, and maximum amount given under this scheme. One month challenge window passed on 13/03 with no challenges being raised. Lessons learnt sessions have been completed across the last quarter on the key project phases to inform future allocation rounds and HAR1 delivery phase.","startDate":"2022-07-20","endDate":"2042-06-30","scheduleNarrative":"The project's end-date at 23/24-Q4 is 2042-06-30. This is primarily due to the following factors. All 11 successful projects remain in the process and contracts are expected to be signed from Summer 2024.","fyBaseline":15.5,"fyForecast":15.5,"fyVariance":0.0,"varianceNarrative":"The budget variance is inferior or equal to 5%.","wholeLifeCost":2366.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 23/24-Q4 is 2366m. This is primarily due to the following factors. HAR1 is on track to deliver the outcomes, costs profile and benefits as agreed through the Full Business Case in Nov-23 which includes: HPBM lifetime costs, NZHF lifetime Capital Expenditure, LCCC counterparty costs from FY 22/23 - 24/25. Future counterparty spend is subject to DESNZ business planning process.","benefits":1285.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 1285m. No deviation from approved monetised benefits position in Full Business Case. The monetised benefits are i) Carbon benefit - the value of the carbon emissions abated as a result of offtakers switching away from fossil fuel use, net of the emissions incurred in the production process (indirect emissions from electricity sourced from the grid). ii) Air quality benefit - the value of reduced air pollution as a result of offtakers switching away from fossil fuel use, net of pollution incurred in the production process (indirect emissions from electricity sourced from the grid). iii) Value of displaced fuels - the monetised benefit of not having to produce and use the fossil fuels that are being displaced by the hydrogen produced from HAR1 projects. iv) Productivity increases - the wage premium associated with creation of jobs to support the construction and operation of the HAR1 projects and associated indirect jobs in the supply chain.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. All 11 projects announced in Dec-23 remain in the process. The counterparty - Low Carbon Contracts Company (LCCC) is expected to offer contracts to successful projects from Summer 2024. The HAR1 scheme was published on…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 23/24-Q4 is 2042-06-30. This is primarily due to the following factors. All 11 successful projects remain in the process and contracts are expected to be signed from Summer 2024.","narrativeClaimKind":null},{"id":"DESNZ_0334_2324-Q3","year":2025,"name":"Hydrogen Allocation Round 1 (HAR1)","department":"DESNZ","category":"Infrastructure and Construction","description":"The first joint electrolytic hydrogen allocation round (HAR1) offers both Hydrogen Production Business Model (HPBM) and Net Zero Hydrogen Fund (NZHF) support to first-of-a-kind electrolytic hydrogen projects. The HPBM is designed to provide a subsidy to low carbon hydrogen producers, helping them to overcome the operating cost gap between low carbon hydrogen and high carbon fossil fuels otherwise consumed. HAR1 is the first opportunity for Government to demonstrate that it is delivering on the ambition for up to 10GW of hydrogen production capacity by 2030. If the UK loses this opportunity to signal support to the hydrogen economy, it will be difficult to meet the investment levels needed to reach our deployment ambitions and build a UK supply chain of skills and components ready for global export. Since the Hydrogen Strategy was published in 2021, our understanding of the role of low carbon hydrogen has continued to evolve. Our knowledge of the system value of potential hydrogen use cases has increased in line with evidence, which indicates a future landscape of lower, more specific demand than previously assumed. In light of this and the Government’s mission-led approach we are planning an update to the UK’s Hydrogen Strategy, expected to be published in 2025.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ All 11 projects announced in Dec-23 remain in the process. The counterparty - Low Carbon Contracts Company (LCCC) is in the process of offering contracts to producers. Four projects have been agreed and contracts have been signed. For the remaining seven projects, we expect contract signature to take place by April/May. The first project is expected to reach commercial operational delivery by June 2025. The HAR1 funding mechanism, the Gas Shipper remains a key delivery enabler. The GSO consultation was published in January 2025 and the consultation period will close on 9 April 2025. DESNZ anticipate publishing the government response in December 2025 and expect the GSO to be operational in 2027.","startDate":"2022-07-20","endDate":"2042-06-30","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 30/06/2042. This is primarily due to the following factors‚ All 11 successful projects remain in the process and contracts are expected to be signed by Spring 2025..","fyBaseline":50.5,"fyForecast":0.0,"fyVariance":100.0,"varianceNarrative":"The budget variance is greater than or equal to 5% This is due to late contract signing and underspend due to only 6 projects signing as at 31.3.25, with the first signing in Dec 2024","wholeLifeCost":2366.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 2366. This is primarily due to the following factors‚ HAR1 is on track to deliver the outcomes, costs profile and benefits as agreed through the Full Business Case in Nov-23 which includes: HPBM lifetime costs, NZHF lifetime Capital Expenditure and LCCC counterparty costs. Future counterparty spend is subject to DESNZ business planning process.","benefits":1285.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 1285. This is primarily due to the following factors‚ the approved monetised benefits position in the Full Business Case remains the best available estimate of project’s benefits. The monetised benefits are: i) Carbon benefit - the value of the carbon emissions abated as a result of offtakers switching away from fossil fuel use, net of the emissions incurred in the production process (indirect emissions from electricity sourced from the grid). ii) Air quality benefit - the value of reduced air pollution as a result of offtakers switching away from fossil fuel use, net of pollution incurred in the production process (indirect emissions from electricity sourced from the grid). iii) Value of displaced fuels - the monetised benefit of not having to produce and use the fossil fuels that are being displaced by the hydrogen produced from HAR1 projects. iv) Productivity increases - the wage premium associated with creation of jobs to support the construction and operation of the HAR1 projects and associated indirect jobs in the supply chain.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ All 11 projects announced in Dec-23 remain in the process. The counterparty - Low Carbon Contracts Company (LCCC) is in the process of offering contracts to…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 30/06/2042. This is primarily due to the following factors‚ All 11 successful projects remain in the process and contracts are expected to be signed by Spring 2025..","narrativeClaimKind":null},{"id":"DESNZ_0334_2324-Q3","year":2026,"name":"Hydrogen Allocation Round 1 (HAR1)","department":"DESNZ","category":"Infrastructure and Construction","description":"The first hydrogen allocation round (HAR1) offered both Hydrogen Production Business Model (HPBM) and Net Zero Hydrogen Fund (NZHF) support to first-of-a-kind electrolytic hydrogen projects. HAR1 aims to unlock private investment, accelerate early hydrogen deployment and support the growth of hydrogen supply chains, whilst contributing to long term decarbonisation and energy system resilience. HAR1 offered support to 11 projects, with the first project becoming operational in April 2026. The HPBM is designed to provide revenue support to low carbon hydrogen producers once their project is operational, helping them to overcome the operating cost gap between low carbon hydrogen and high carbon fossil fuels. Funding for the HPBM, confirmed at Budget 2024, will be exchequer funded until the introduction of the proposed Gas Shipper Obligation. The NZHF provides up to 20% capital expenditure (CAPEX) support for HAR 1 projects.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors: 11 Projects have signed contracts. Although 1 project withdrew (Whitelee), the remaining 10 projects continue to progress to either reach FID and subsequently COD or are imminently about to reach COD (HyMarnham April 2026). Remaining projects are expected to reach COD between August 2027 and August 2029 but this is due to external factors to DESNZ. These timeframes are also subject to projects individual circumstances and may change. There have been some projects requiring NZHF grant funding in the next financial year as opposed to 25/26 and relevant documentation has been completed to account for this. We are working with projects and LCCC to ensure DESNZ can support the continual progression of projects to reach COD.","startDate":"2022-07-20","endDate":"2042-06-30","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remains as 2042","fyBaseline":49.94,"fyForecast":4.83,"fyVariance":90.33,"varianceNarrative":"There is no variance to the HMT approved budget.","wholeLifeCost":2461.71,"costNarrative":"WLC are £2461.71m in Real Prices 24/25 as calculated by NISTA based on £2366m (DESNZ Real Prices Calendar Year 2023)","benefits":1336.98,"benefitsNarrative":"Benefits are £1366.98m in Real Prices 24/25 as calculated by NISTA based on £1285m (DESNZ Real Prices Calendar Year 2023)","themes":["Cost & funding","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors: 11 Projects have signed contracts. Although 1 project withdrew (Whitelee), the remaining 10 projects continue to progress to either reach FID and subsequently COD or are imminently…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remains as 2042","narrativeClaimKind":null}],"previous":{"id":"DESNZ_0334_2324-Q3","year":2025,"name":"Hydrogen Allocation Round 1 (HAR1)","department":"DESNZ","category":"Infrastructure and Construction","description":"The first joint electrolytic hydrogen allocation round (HAR1) offers both Hydrogen Production Business Model (HPBM) and Net Zero Hydrogen Fund (NZHF) support to first-of-a-kind electrolytic hydrogen projects. The HPBM is designed to provide a subsidy to low carbon hydrogen producers, helping them to overcome the operating cost gap between low carbon hydrogen and high carbon fossil fuels otherwise consumed. HAR1 is the first opportunity for Government to demonstrate that it is delivering on the ambition for up to 10GW of hydrogen production capacity by 2030. If the UK loses this opportunity to signal support to the hydrogen economy, it will be difficult to meet the investment levels needed to reach our deployment ambitions and build a UK supply chain of skills and components ready for global export. Since the Hydrogen Strategy was published in 2021, our understanding of the role of low carbon hydrogen has continued to evolve. Our knowledge of the system value of potential hydrogen use cases has increased in line with evidence, which indicates a future landscape of lower, more specific demand than previously assumed. In light of this and the Government’s mission-led approach we are planning an update to the UK’s Hydrogen Strategy, expected to be published in 2025.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ All 11 projects announced in Dec-23 remain in the process. The counterparty - Low Carbon Contracts Company (LCCC) is in the process of offering contracts to producers. Four projects have been agreed and contracts have been signed. For the remaining seven projects, we expect contract signature to take place by April/May. The first project is expected to reach commercial operational delivery by June 2025. The HAR1 funding mechanism, the Gas Shipper remains a key delivery enabler. The GSO consultation was published in January 2025 and the consultation period will close on 9 April 2025. DESNZ anticipate publishing the government response in December 2025 and expect the GSO to be operational in 2027.","startDate":"2022-07-20","endDate":"2042-06-30","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 30/06/2042. This is primarily due to the following factors‚ All 11 successful projects remain in the process and contracts are expected to be signed by Spring 2025..","fyBaseline":50.5,"fyForecast":0.0,"fyVariance":100.0,"varianceNarrative":"The budget variance is greater than or equal to 5% This is due to late contract signing and underspend due to only 6 projects signing as at 31.3.25, with the first signing in Dec 2024","wholeLifeCost":2366.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 2366. This is primarily due to the following factors‚ HAR1 is on track to deliver the outcomes, costs profile and benefits as agreed through the Full Business Case in Nov-23 which includes: HPBM lifetime costs, NZHF lifetime Capital Expenditure and LCCC counterparty costs. Future counterparty spend is subject to DESNZ business planning process.","benefits":1285.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 1285. This is primarily due to the following factors‚ the approved monetised benefits position in the Full Business Case remains the best available estimate of project’s benefits. The monetised benefits are: i) Carbon benefit - the value of the carbon emissions abated as a result of offtakers switching away from fossil fuel use, net of the emissions incurred in the production process (indirect emissions from electricity sourced from the grid). ii) Air quality benefit - the value of reduced air pollution as a result of offtakers switching away from fossil fuel use, net of pollution incurred in the production process (indirect emissions from electricity sourced from the grid). iii) Value of displaced fuels - the monetised benefit of not having to produce and use the fossil fuels that are being displaced by the hydrogen produced from HAR1 projects. iv) Productivity increases - the wage premium associated with creation of jobs to support the construction and operation of the HAR1 projects and associated indirect jobs in the supply chain.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ All 11 projects announced in Dec-23 remain in the process. The counterparty - Low Carbon Contracts Company (LCCC) is in the process of offering contracts to…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 30/06/2042. This is primarily due to the following factors‚ All 11 successful projects remain in the process and contracts are expected to be signed by Spring 2025..","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":0,"attentionScore":33,"attentionReasons":["Current published delivery confidence is Amber","In-year forecast variance is +90.3%"]},{"id":"MOD_0105_1617-Q1","year":2026,"name":"LAND ENVIRONMENT TACTICAL COMMUNICATION AND INFORMATION SYSTEMS","department":"MOD","category":"Military Capability","description":"The LETacCIS programme consists of multiple projects which deliver and sustain world-class tactical C4 capabilities, Command, Control, Communications and Computers, enabling the war-fighter to win, The programme includes projects that have already delivered equipment into service (Bowman), however under the new Army Operating Model, in-service capabilities are moving to HQ Fd Army. The LETacCIS programme is delivered by a partnership of Army Headquarters and Defence Digital’s Tactical Systems (TacSys) Service Executive, working as one team in collaboration with industry partners.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 increased to Amber. This is primarily due to the following factors. 1. Delivery continues and tangible progress is being made across multiple project lines. 2. Approval to maintain Heavy Forces communications via BCIP 5.7 remains affordable, and is awaiting Treasury approval. 3. The programme ambition to reset its delivery approach through a Strategic Outline Case has yet to be approved. 4. The programme is therefore operating at risk, pending Strategic Outline Case and wider Defence Investment Plan decisions.","startDate":"2013-10-16","endDate":"2035-12-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end date at 25/26-Q4 remained the same at 31/12/2035.","fyBaseline":255.1,"fyForecast":134.71,"fyVariance":47.19,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. 1. The financial year (FY) 25/26 position, shows an underspend against Control Total of £124.3M. This is driven by re‑profiling and delays across several smaller projects, including approvals, project cancellation/reset decisions and ongoing commercial negotiations.","wholeLifeCost":7734.29,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) increased from £8208M to £8375M. This is primarily due to the following factor. 1. An increase to Trinity Budget Whole Life Costs forecasts following ongoing negotiations with the supplier.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 increased to Amber. This is primarily due to the following factors. 1. Delivery continues and tangible progress is being made across multiple project lines. 2. Approval to maintain Heavy Forces communications via BCIP 5.7 remains affordable, and is…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the programme's end date at 25/26-Q4 remained the same at 31/12/2035.","narrativeClaimKind":null,"history":[{"id":"MOD_0105_1617-Q1","year":2020,"name":"Land Environment Tactical Communication and Information Systems","department":"MOD","category":"Military Capability","description":"A transformational change programme that will 'information-enable' the Land Environment in the full conduct of operations.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Provision of�narrative�not possible due to prioritisation of Covid 19 response","startDate":"2013-10-16","endDate":"2035-12-31","scheduleNarrative":"Provision of�narrative�not possible due to prioritisation of Covid 19 response","fyBaseline":235.38,"fyForecast":238.18,"fyVariance":1.0,"varianceNarrative":"Provision of�narrative�not possible due to prioritisation of Covid 19 response","wholeLifeCost":11399.76,"costNarrative":"Provision of�narrative�not possible due to prioritisation of Covid 19 response","benefits":null,"benefitsNarrative":"","themes":[],"evidenceExcerpt":"Provision of�narrative�not possible due to prioritisation of Covid 19 response Provision of�narrative�not possible due to prioritisation of Covid 19 response","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2020","sourceLabel":"IPA Annual Report 2019-20","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Provision of�narrative�not possible due to prioritisation of Covid 19 response","narrativeClaimKind":null},{"id":"MOD_0105_1617-Q1","year":2021,"name":"Land Environment Tactical Communication and Information Systems (LETacCIS)","department":"MOD","category":"Military Capability","description":"The Land Environment Tactical Communication and Information System programme is a military capability and business change programme that will deliver the Land Domain's deployed digital backbone in support of tactical (front line) users in the Army, Royal Marine, RAF Regiment and RAF Deployed Operating Bases. It will be achieved through the ongoing sustainment, evolution or replacement of Communication Information Systems and associated applications to underpin the transition to a Single Information Environment for users across Defence.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber. This is primarily due to the following factors: The Programme continues to make headway and is already delivering change, with the achievement on schedule of Full Operating Capability of a major upgrade of the in-service Bowman (BCIP 5.6) in December 2020. The 2020/21 period has also seen the Ministry Of Defences Investment Approval Committee approve business cases for both Project TRINITY (terrestrial broadband network in the field) and Project Dismounted Situational Awareness (end user radios, Information Technology and applications for the infantry). Both projects are now undergoing commercial activity with the marketplace, with a Pre Qualification Questionnaire and a competition for Design Services Partner respectively. In addition, a new pan-Programme Logistics Support Contract with Babcock was let in March 21.","startDate":"2013-05-01","endDate":"2035-12-31","scheduleNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","fyBaseline":247.27,"fyForecast":198.21,"fyVariance":-20.0,"varianceNarrative":"The budget variance exceeds 5%. This variance was generated primarily by delays to the MORPHEUS Sub-Programme, delays to contract negotiations and approvals delays.","wholeLifeCost":14351.53,"costNarrative":"Compared to financial year 19/20-Q2, the projects Baseline Whole Life Cost increased from �11399.76m to �14351.33m. This is primarily due to the following factors: The main cost driver has been MORPHEUS Sub-Programme which has had a number of significant and material cost increases in this period as the programme matures. Other factors are the 19/20-Q2 Budgeted baseline did not include the full Budget Provision for Year 10 (gap of �410m) which was a result of the timing of CT disaggregation. The programme has also expanded to include a number of projects such as NIOBE and AFV Headsets. The Whole Life Costs assessment has also been impacted by a review of the relevant Out of Service Dates to ensure they adhere to the correct planning assumptions.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber. This is primarily due to the following factors: The Programme continues to make headway and is already delivering change, with the achievement on schedule of Full Operating Capability of a major upgrade of the in-service…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","narrativeClaimKind":null},{"id":"MOD_0105_1617-Q1","year":2022,"name":"Land Environment Tactical Communication and Information Systems","department":"MOD","category":"Military Capability","description":"The Land Environment Tactical Communication and Information System programme is a military capability and business change programme that will deliver the Land Domain's deployed digital backbone in support of tactical (front line) users in the Army, Royal Marine, RAF Regiment and RAF Deployed Operating Bases. It will be achieved through the ongoing sustainment, evolution or replacement of Communication Information Systems and associated applications to underpin the transition to a Single Information Environment for users across Defence.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber. This is primarily due to the following factors: The health of the programme has not significantly changed over the past 12 months. There are significant gains being made in Dismounted Situational Awareness and Trinity. While some good progress has been made with Morpheus Open to Evolve system there are aspects of the software deveopment of the programme that needs more work.","startDate":"2013-05-01","endDate":"2035-12-31","scheduleNarrative":"Compared to 2021-Q4, the project end-date remained scheduled to finish on 31 December 35.","fyBaseline":155.69,"fyForecast":69.45,"fyVariance":-55.0,"varianceNarrative":"The budget variance exceeds 5%. The In-Year underspend was primarily generated by delays within Morpheus and the ongoing consideration of the Morpheus Assessment Phase 2 outputs.","wholeLifeCost":13140.0,"costNarrative":"Compared to 2021-Q4, the projects Baseline Whole Life Cost decreased from 13901.22 (£m) to 13140.44 (£m). This is primarily due to the following factors: The main cost driver to the change in Whole Life Cost has been Morpheus, with a re-baseline to recognise the schedule and cost impact of the General Dynamics Transition Partner contract delays, and the 37mth extension to the completion of the Evolve to Open Design and Development phase.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Scope & requirements","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber. This is primarily due to the following factors: The health of the programme has not significantly changed over the past 12 months. There are significant gains being made in Dismounted Situational Awareness and Trinity. While…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to 2021-Q4, the project end-date remained scheduled to finish on 31 December 35.","narrativeClaimKind":null},{"id":"MOD_0105_1617-Q1","year":2023,"name":"Land Environment Tactical Communication and Information Systems","department":"MOD","category":"Military Capability","description":"The Land Environment Tactical Communication and Information Systems programme is a capability and business change programme that will deliver the Land Domain's deployed digital backbone through the sustainment, evolution or replacement of Communication and Information Systems and associated applications to underpin the transition to a Single Information Environment.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. The programme remains on track, with significant gains being made in the Dismounted Situational Awareness, Multi-Mode Radio and Trinity projects. Discussions with General Dynamics Mission Systems (UK) on how best to deliver the totality of Morpheus are continuing.","startDate":"2013-05-01","endDate":"2035-12-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2035-12-31. This is primarily due to the following factors. NA","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","wholeLifeCost":13523.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 increased from 13140m. to 13523m. This is primarily due to the following factors. The impact of inflation, alignment of Morpheus, implementation of the Bowman Combat Infrastructure and Platform Sustainment Future Change Request and Trinity contract negotiations.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This programme does not report cashable benefits. Its aim is to provision the armed forces with the equipment and / or infrastructure required.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. The programme remains…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2035-12-31. This is primarily due to the following factors. NA","narrativeClaimKind":null},{"id":"MOD_0105_1617-Q1","year":2024,"name":"Land Environment Tactical Communication and Information Systems","department":"MOD","category":"Military Capability","description":"The LETacCIS programme consists of multiple projects with the aim of delivering the next generation of tactical military communications in the Land Environment, and providing the means to make informed and timely decisions, enabled by agile Communication Information Systems (CIS). The LETacCIS programme is delivered by a partnership of Army Headquarters and Defence Digital’s Tactical Systems (TacSys) Service Executive, working as one team in collaboration with key industry partners.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to Financial Year 22/23-Q4, the Infrastructure and Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors: Following a review of requirements under Project IRIS of the Land Domain Deployed Digital Ecosystem, and a reprofiling of the MORPHEUS Control Total, there is now an associated pause to realign MORPHEUS. This will require further capability enhancement to Bowman Combat Infrastructure and Platform (BCIP) to mitigate the delay to MORPHEUS, in addition to BCIP security and operating system obsolescence. The wider programme funding remains unaltered, with no impact to the other major change projects (ie. BCIP 5.7, DSA and TRINITY).","startDate":"2013-10-16","endDate":"2035-12-31","scheduleNarrative":"Compared to Financial Year 22/23-Q4, the project's end-date at 23/24-Q4 remained scheduled to finish on 2035-12-31. This is primarily due to the following factors: Whilst the Balance of Investment (BoI) decision made in Q3 will delay MORPEHUS, and there has been slippage in DSA and TRINITY, the schedule for the programme overall remains on track. Regaining momentum on TRINITY (now on contract) is achievable and work is underway. DSA will be subject to a thorough review of its delivery strategy and timeline, with a re-baselined schedule to follow in 2024/25 once the analysis is complete.","fyBaseline":174.8,"fyForecast":136.18,"fyVariance":-22.094,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The Programme forecast currently shows an underspend against Control Total of £39M, related to prioritisation decisions related to MORPHEUS and Dismounted Situational Awareness (DSA).","wholeLifeCost":13431.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 decreased from 13523m to 13431m. This is primarily due to the following factors. The main cost driver to the reduction in WLC has been the termination of project NIOBE and subsequent removal of In Year and future Control Totals. Previous Balance of Investment (BoI) decisions resulted in a reprofiling to Project MORPHEUS (a major LETacCIS Cat A project). The Budget Whole Life Cost (WLC) does not currently reflect the BoI reprofile.","benefits":0.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 0m.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Approvals & decisions"],"evidenceExcerpt":"Compared to Financial Year 22/23-Q4, the Infrastructure and Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors: Following a review of requirements under Project IRIS of the Land Domain Deployed Digital Ecosystem, and a reprofiling of the MORPHEUS Control Total, there is now…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to Financial Year 22/23-Q4, the project's end-date at 23/24-Q4 remained scheduled to finish on 2035-12-31. This is primarily due to the following factors: Whilst the Balance of Investment (BoI) decision made in Q3 will delay MORPEHUS, and there has been slippage in DSA and TRINITY, the schedule for the programme overall remains on track. Regaining momentum on TRINITY (now on contract) is achievable and work is underway. DSA will be subject to a thorough review of its delivery strategy and timeline, with a re-baselined schedule to follow in 2024/25 once the analysis is complete.","narrativeClaimKind":null},{"id":"MOD_0105_1617-Q1","year":2025,"name":"LAND ENVIRONMENT TACTICAL COMMUNICATION AND INFORMATION SYSTEMS","department":"MoD","category":"Military Capability","description":"The LETacCIS programme consists of multiple projects with the aim of `delivering and sustaining world-class tactical Command, Control, Communications, Computers and Information (C4I) capabilities, enabling the war-fighter to win`. The programme includes projects that have already delivered equipment into service. However under the (2022) Army Operating Model, in-service capabilities are in the process of moving to HQ Field Army. The LETacCIS programme is deliveRed by a partnership of Army Headquarters and Defence Digital’s Tactical Systems (TacSys) Service Executive, working as one team in collaboration with industry partners.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 decreased from AMBER to RED. This is primarily due to the following factors. Following a review of requirement under Project IRIS and a reprofiling of the Control Total, the original plans for Project MORPHEUS have been paused. The outcomes sought for MORPHEUS will now be delivered through Land Domain Command, Control, Communications, Computers and Information (C4I) Activity. TRINITY and Land Deployable Gateway Version 2 (LDGv2) are on contract within the programme. The overall health of the programme remains Red.","startDate":"2013-10-16","endDate":"2035-12-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/12/2035.","fyBaseline":160.75,"fyForecast":70.56,"fyVariance":56.11,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The financial year (FY)24/25 position, as at Feb 2025, shows an underspend against Control Total of £90.2M. The material drivers of the In Year underspend are related to Evolve to Open (EvO), Multi-Mode Radio (MMR), DSA and TRINITY. EvO expenditure has reduced in line with TacSys Resource Partner (TRP) efficiencies and realism following the Workforce Cost Envelope review and recruitment freeze. Following the Centre led IY Capital Expenditure Limit (CDEL) blight, MMR purchase has been deferRed into FY25/26. DSA expenditure has been delayed following the decision to reset the project. TRINITY expenditure has been Reduced due to ongoing negotiations with BAE Systems.","wholeLifeCost":8208.31,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 13431 to 8208. This is primarily due to the following factors. Annual Budgetary Cycle (ABC)24 Balance of Investment decisions which resulted in a reprofiling to Project MORPHEUS (a major LETacCIS Cat A project) of £1.3Bn over 10 years. This has now been reflected in the costed programme, along with the associated future years costs, and is the main cost driver to the reduction in WLC.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Governance & assurance","Scope & requirements","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 decreased from AMBER to RED. This is primarily due to the following factors. Following a review of requirement under Project IRIS and a reprofiling of the Control Total, the original plans for Project MORPHEUS have been paused. The outcomes sought for MORPHEUS will…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/12/2035.","narrativeClaimKind":null},{"id":"MOD_0105_1617-Q1","year":2026,"name":"LAND ENVIRONMENT TACTICAL COMMUNICATION AND INFORMATION SYSTEMS","department":"MOD","category":"Military Capability","description":"The LETacCIS programme consists of multiple projects which deliver and sustain world-class tactical C4 capabilities, Command, Control, Communications and Computers, enabling the war-fighter to win, The programme includes projects that have already delivered equipment into service (Bowman), however under the new Army Operating Model, in-service capabilities are moving to HQ Fd Army. The LETacCIS programme is delivered by a partnership of Army Headquarters and Defence Digital’s Tactical Systems (TacSys) Service Executive, working as one team in collaboration with industry partners.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 increased to Amber. This is primarily due to the following factors. 1. Delivery continues and tangible progress is being made across multiple project lines. 2. Approval to maintain Heavy Forces communications via BCIP 5.7 remains affordable, and is awaiting Treasury approval. 3. The programme ambition to reset its delivery approach through a Strategic Outline Case has yet to be approved. 4. The programme is therefore operating at risk, pending Strategic Outline Case and wider Defence Investment Plan decisions.","startDate":"2013-10-16","endDate":"2035-12-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end date at 25/26-Q4 remained the same at 31/12/2035.","fyBaseline":255.1,"fyForecast":134.71,"fyVariance":47.19,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. 1. The financial year (FY) 25/26 position, shows an underspend against Control Total of £124.3M. This is driven by re‑profiling and delays across several smaller projects, including approvals, project cancellation/reset decisions and ongoing commercial negotiations.","wholeLifeCost":7734.29,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) increased from £8208M to £8375M. This is primarily due to the following factor. 1. An increase to Trinity Budget Whole Life Costs forecasts following ongoing negotiations with the supplier.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 increased to Amber. This is primarily due to the following factors. 1. Delivery continues and tangible progress is being made across multiple project lines. 2. Approval to maintain Heavy Forces communications via BCIP 5.7 remains affordable, and is…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the programme's end date at 25/26-Q4 remained the same at 31/12/2035.","narrativeClaimKind":null}],"previous":{"id":"MOD_0105_1617-Q1","year":2025,"name":"LAND ENVIRONMENT TACTICAL COMMUNICATION AND INFORMATION SYSTEMS","department":"MoD","category":"Military Capability","description":"The LETacCIS programme consists of multiple projects with the aim of `delivering and sustaining world-class tactical Command, Control, Communications, Computers and Information (C4I) capabilities, enabling the war-fighter to win`. The programme includes projects that have already delivered equipment into service. However under the (2022) Army Operating Model, in-service capabilities are in the process of moving to HQ Field Army. The LETacCIS programme is deliveRed by a partnership of Army Headquarters and Defence Digital’s Tactical Systems (TacSys) Service Executive, working as one team in collaboration with industry partners.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 decreased from AMBER to RED. This is primarily due to the following factors. Following a review of requirement under Project IRIS and a reprofiling of the Control Total, the original plans for Project MORPHEUS have been paused. The outcomes sought for MORPHEUS will now be delivered through Land Domain Command, Control, Communications, Computers and Information (C4I) Activity. TRINITY and Land Deployable Gateway Version 2 (LDGv2) are on contract within the programme. The overall health of the programme remains Red.","startDate":"2013-10-16","endDate":"2035-12-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/12/2035.","fyBaseline":160.75,"fyForecast":70.56,"fyVariance":56.11,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The financial year (FY)24/25 position, as at Feb 2025, shows an underspend against Control Total of £90.2M. The material drivers of the In Year underspend are related to Evolve to Open (EvO), Multi-Mode Radio (MMR), DSA and TRINITY. EvO expenditure has reduced in line with TacSys Resource Partner (TRP) efficiencies and realism following the Workforce Cost Envelope review and recruitment freeze. Following the Centre led IY Capital Expenditure Limit (CDEL) blight, MMR purchase has been deferRed into FY25/26. DSA expenditure has been delayed following the decision to reset the project. TRINITY expenditure has been Reduced due to ongoing negotiations with BAE Systems.","wholeLifeCost":8208.31,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 13431 to 8208. This is primarily due to the following factors. Annual Budgetary Cycle (ABC)24 Balance of Investment decisions which resulted in a reprofiling to Project MORPHEUS (a major LETacCIS Cat A project) of £1.3Bn over 10 years. This has now been reflected in the costed programme, along with the associated future years costs, and is the main cost driver to the reduction in WLC.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Governance & assurance","Scope & requirements","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 decreased from AMBER to RED. This is primarily due to the following factors. Following a review of requirement under Project IRIS and a reprofiling of the Control Total, the original plans for Project MORPHEUS have been paused. The outcomes sought for MORPHEUS will…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/12/2035.","narrativeClaimKind":null},"ratingDelta":-1,"transition":"Improved","endDateDeltaDays":0,"attentionScore":33,"attentionReasons":["Current published delivery confidence is Amber","In-year forecast variance is +47.2%"]},{"id":"HO_0331_2324-Q4","year":2026,"name":"Police National Database (PND)","department":"HO","category":"Information and Communications Technology (ICT)","description":"The Home Office, in partnership with the National Police Chiefs’ Council (NPCC), delivers the Police National Database (PND), a national intelligence system enabling information sharing across police forces and law enforcement agencies. The system supports safeguarding, crime prevention and detection, and the protection of communities. PND is designated Critical National Infrastructure (CNI), with all users required to complete College of Policing training. In January 2024, the programme received approval for a £385.6m whole-life Full Business Case to deliver the PND 1.5 Transformation, aiming to extend service life, address technical debt, enable cloud migration, and modernise the service. Delivery challenges led to the programme being paused in June 2025. A revised delivery approach was subsequently adopted, focusing on stabilisation and sustainment through insourcing services into a Home Office data centre and addressing risks associated with legacy systems. This approach, and associated funding, was approved by the Investment Committee in March 2026. The programme is now focused on maintaining service continuity, transitioning away from the existing supplier arrangement, stabilising operations, and undertaking discovery to inform longer-term transformation options.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"At Q4 2025/26, the programme’s Delivery Confidence Assessment (DCA) improved to Amber (from Q4 2024/25). This reflects increased confidence following the decision to revise the delivery approach and focus on insourcing the PND service. Progress has been made in addressing delivery risks and constraints, including the development and review of a supplier-led plan to support insourcing. A refreshed Programme Business Case was developed and approved by the Home Office Investment Committee, supported by engagement with key stakeholders, including policing partners. In January 2026, the programme underwent an Assurance of Action Plan Review, which resulted in an Amber rating. The review recognised improvements in programme delivery confidence, supported by strengthened stakeholder engagement, effective communications, and a continued focus on collaboration and knowledge sharing.","startDate":"2024-01-18","endDate":null,"scheduleNarrative":"At Q4 2025/26, the forecast end date moved from 31 March 2026 to 27 October 2027. This reflects the revised delivery approach following the decision to pivot to an insourcing model. A delivery plan was developed with the incumbent supplier to support transition and contract exit, including an updated exit plan covering service transition arrangements. This plan sets out key milestones aligned to the insourcing approach, with delivery expected to commence in April 2026, service transition completed by July 2027, and an early-life support period extending to October 2027. The revised schedule reflects the prioritisation of a safe and secure transition, given the Critical National Infrastructure status of PND.","fyBaseline":53.69,"fyForecast":13.84,"fyVariance":74.22,"varianceNarrative":"At Q4 2025/26, the programme reports a budget variance exceeding 5%. This reflects the revised delivery approach following the decision to pivot to an insourcing model. The change in approach was driven by risks to service continuity, including the ageing platform, increasing instability, and its inability to meet modern security standards. The revised Programme Business Case therefore prioritises service sustainment, continuity, and essential preparatory activity to enable future transformation. As a result of replanning, in-year costs have reduced, reflecting the pause in previously planned transformation activity and associated milestone payments. The revised scope also results in a reduction in whole-life cost and associated benefits compared to earlier forecasts.","wholeLifeCost":282.64,"costNarrative":"At Q4 2025/26, the departmentally agreed Whole Life Cost decreased from £387.64m to £289.42m. This reflects the revised delivery approach following the decision to pivot to an insourcing model. The change in approach was driven by risks to service continuity, including the ageing platform, increasing instability, and its inability to meet modern security standards. The revised Programme Business Case therefore prioritises service sustainment, continuity, and essential preparatory activity to enable future transformation. As a result of replanning, in year costs have reduced due to the pause in previously planned transformation activity and associated milestone payments. The reduced scope also results in a lower overall whole-life cost and a corresponding reduction in forecast benefits.","benefits":39.75,"benefitsNarrative":"At Q4 2025/26, the departmentally agreed benefits decreased from £639.31m to £43.1m. This reflects the revised delivery approach following the decision to pivot to an insourcing model. The change in approach was driven by risks to service continuity, including the ageing platform, increasing instability, and its inability to meet modern security standards. The revised Programme Business Case therefore prioritises service sustainment, continuity, and essential preparatory activity to enable future transformation. As a result of replanning and the reduced scope of transformation activity, forecast benefits have decreased. However, the longer-term benefits associated with modernisation and transformation remain achievable and will be explored through a future Business Case.","themes":["Delivery & schedule","Approvals & decisions","Cost & funding","Governance & assurance"],"evidenceExcerpt":"At Q4 2025/26, the programme’s Delivery Confidence Assessment (DCA) improved to Amber (from Q4 2024/25). This reflects increased confidence following the decision to revise the delivery approach and focus on insourcing the PND service. Progress has been made in addressing delivery risks and constraints, including the development and review of a supplier-led…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"At Q4 2025/26, the forecast end date moved from 31 March 2026 to 27 October 2027. This reflects the revised delivery approach following the decision to pivot to an insourcing model. A delivery plan was developed with the incumbent supplier to support transition and contract exit, including an updated exit plan covering service transition arrangements. This plan sets out key milestones aligned to the insourcing approach, with delivery expected to commence in April 2026, service transition completed by July 2027, and an early-life support period extending to October 2027. The revised schedule reflects the prioritisation of a safe and secure transition, given the Critical National Infrastructure status of PND.","narrativeClaimKind":null,"history":[{"id":"HO_0331_2324-Q4","year":2024,"name":"Police National Database (PND)","department":"HO","category":"ICT","description":"The Police National Database (PND) provides an aggregation of Crime, Intelligence, Custody, Child Protection, and Domestic Violence data held on local police systems. Information is held as a single national POLE store (People, Objects, Locations, Events), algorithms on the PND match people, vehicles and phone numbers and present a consolidated view._x000D_ The PND holds information on Organised Crime Groups, modern slavery, and county lines and provides national capability for searching police custody images. The PND is essential for operational policing in safeguarding children and vulnerable people, countering terrorism, crime prevention, and tackling serious and organised crime. It is deemed Critical National Infrastructure; without the PND risk to public safety would increase as intelligence would not be accessed nationally by Police Forces._x000D_ _x000D_ The PND programme is delivering a transformed service to better meet policing needs, replace, or upgrade obsolescent technology, move to Cloud, and secure service continuity to the 10yr+ horizon.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. PND Programme is reporting an Amber RAG status as Full Business Case (FBC) for full scope of programme was approved and funded at InvestCo on 18th Jan 24. A Fixed Price Proposal for delivery of PND 1.5 Transformation programme was subsequently signed on 19th Jan 24. PND 1.5 Transformation is expected to be delivered by June 2025._x000D_ _x000D_ Programme has completed two Critical, one Essential and one Recommended recommendation from Gate 3 Review in Dec 23, programme is on track to complete the other six Recommended recommendations.","startDate":"2024-01-18","endDate":"2026-03-31","scheduleNarrative":"The project's end-date at 23/24-Q4 is 2026-03-31. This is primarily due to the following factors. Contract with incumbent supplier terminates 31 Mar 26, however the forecasted date for end of Procurement project and transition to new contract is 29 Jan 27. Focus on approval for PND 1.5 Full Business Case has delayed commencement of PND Procurement. Progress of PND 1.5 Transformation programme and dependencies mean requirements are likely to change, this is delaying release of the Invitation to Tender (ITT) to the market._x000D_ _x000D_ The PND 1.5 Transformation programme is expected to be delivered by Oct 25.","fyBaseline":41.82,"fyForecast":41.82,"fyVariance":0.0,"varianceNarrative":"The budget variance is inferior or equal to 5%.","wholeLifeCost":395.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 23/24-Q4 is 395m. This is primarily due to the following factors. This is made up of 146.7m (CDEL), the majority of these costs are funding the PND 1.5 Transformation programme including new Hosting Platform costs (LECP). 248.4m (RDEL) is costs for implementing sustainment activity and business change pipeline.","benefits":639.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 639m. To develop and appraise the benefits profile the programme team has worked closely with Home Office Analysis and Insight (HOAI), Central Economic Unit (CEU) economists and conducted a series of workshops and 1-to-1 interviews with PND police subject matter experts (SME's) attached to the programme team, PND training staff from the College of Policing (CoP), and experienced PND users from forces and non-police law enforcement (LE) and regulatory bodies. _x000D_ All the benefits quantified and monetised are achieved through the delivery of the PND 1.5 Transformation programme. A description of each monetised benefit is found in section 1.05 (1.05.01 - 1.05.05)_x000D_ _x000D_ It has not been possible to quantify and monetise all identified benefits. A description of these non-monetised benefits, that the programme is relatively confident of PND 1.5 Transformation programme materialising, are described in section 1.05 (1.05.05 - 1.05.10).","themes":["Commercial & supply chain","Cost & funding","Approvals & decisions","Delivery & schedule"],"evidenceExcerpt":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. PND Programme is reporting an Amber RAG status as Full Business Case (FBC) for full scope of programme was approved and funded at InvestCo on 18th Jan 24. A Fixed Price Proposal for delivery of PND 1.5 Transformation…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 23/24-Q4 is 2026-03-31. This is primarily due to the following factors. Contract with incumbent supplier terminates 31 Mar 26, however the forecasted date for end of Procurement project and transition to new contract is 29 Jan 27. Focus on approval for PND 1.5 Full Business Case has delayed commencement of PND Procurement. Progress of PND 1.5 Transformation programme and dependencies mean requirements are likely to change, this is delaying release of the Invitation to Tender (ITT) to the market._x000D_ _x000D_ The PND 1.5 Transformation programme is expected to be delivered by Oct 25.","narrativeClaimKind":null},{"id":"HO_0331_2324-Q4","year":2025,"name":"Police National Database (PND)","department":"HO","category":"ICT","description":"Police National Database (PND) Programme aims to: • Ensure Business Continuity of the PND Service as Critical National Infrastructure (CNI) to a 5-10 year horizon • Transition PND to cloud-native architecture and migrate hosting to the Law Enforcement Cloud Platform (LECP) • Replace or update obsolescent technology components, specifically Oracle database & middleware, and Initiate names matching which is unsupported • Improve the usability of the system, be intuitive and easy to navigate, with viewable and meaningful search results that can be exported and shared as required by operational policing • Deliver PND Application Programming Interface (APIs) that enable export and analysis of PND data and expose APIs for federated searching across national police data sets • Enable PND to continue to act as a national source of info for organised crime, organised crime groups, including county lines, modern slavery, and human trafficking until such time as it replaced by the future data strategy agreed by policing and Public Safety Group (PSG) • From a Commercial perspective the HO will need to align the migration to Law Enforcement Cloud Platform (LECP) and transition to a new contract for run, maintenance and support (the current contract with the incumbent supplier is due to expire end of March 2026. On the 15th May Investment Committee rejected the suppliers Contract Change Notice. As a result, the board approved a pivot in delivery to in source the service, negating the need for a procurement to be run.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 decreased from AMBER to RED. This is primarily due to the following factors‚ Ten months ago, the Home Office received a Milestone Impact Assessment highlighting a five-month delay to delivery. Since then, the Home Office has collaborated closely with the supplier to undertake a comprehensive review of the end-to-end delivery plan. This included significantly increasing commercial support and initiating a full programme reset. On 15 May 2025, the Investment Committee (InvestCo) declined the proposed Contract Change Notification and instead chose to pursue a contingency option. The programme is now preparing for a further NISTA-led Gate 0/3 Review, which will evaluate the progress of the contingency approach and inform updates to the Full Business Case ahead of the next InvestCo meeting in December 2025.","startDate":"2024-01-18","endDate":"2026-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2026. This is primarily due to the following factors‚ Ten months ago, the Home Office received a Milestone Impact Assessment highlighting a five-month delay to delivery. Since then, the Home Office has collaborated closely with the supplier to undertake a comprehensive review of the end-to-end delivery plan. This included significantly increasing commercial support and initiating a full programme reset. On 15 May 2025, the Investment Committee (InvestCo) declined the proposed Contract Change Notification and instead chose to pursue a contingency option. The programme is now preparing for a further NISTA-led Gate 0/3 Review, which will evaluate the progress of the contingency approach and inform updates to the Full Business Case ahead of the next InvestCo meeting in December 2025.","fyBaseline":77.93,"fyForecast":55.66,"fyVariance":28.58,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The programme has suffered some delays in delivery and subsequently some planned delivery milestone payments have not yet fallen due.","wholeLifeCost":387.64,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 395 to 387. This is primarily due to the following factors‚ The cause for a decrease in Whole Life Costs is due to the removal of optimism bias costs from the previous financial year 2024/2025.","benefits":639.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 639. This is primarily due to the following factors‚ The programme is updating a revised version of the business case by December 2025. This will include a full review of the strategic objectives and benefits. However, our initial assessment shows that majority are still achievable, even through delivery of a contingency option.","themes":["Delivery & schedule","Cost & funding","Commercial & supply chain","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 decreased from AMBER to RED. This is primarily due to the following factors‚ Ten months ago, the Home Office received a Milestone Impact Assessment highlighting a five-month delay to delivery. Since then, the Home Office has…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2026. This is primarily due to the following factors‚ Ten months ago, the Home Office received a Milestone Impact Assessment highlighting a five-month delay to delivery. Since then, the Home Office has collaborated closely with the supplier to undertake a comprehensive review of the end-to-end delivery plan. This included significantly increasing commercial support and initiating a full programme reset. On 15 May 2025, the Investment Committee (InvestCo) declined the proposed Contract Change Notification and instead chose to pursue a contingency option. The programme is now preparing for a further NISTA-led Gate 0/3 Review, which will evaluate the progress of the contingency approach and inform updates to the Full Business Case ahead of the next InvestCo meeting in December 2025.","narrativeClaimKind":null},{"id":"HO_0331_2324-Q4","year":2026,"name":"Police National Database (PND)","department":"HO","category":"Information and Communications Technology (ICT)","description":"The Home Office, in partnership with the National Police Chiefs’ Council (NPCC), delivers the Police National Database (PND), a national intelligence system enabling information sharing across police forces and law enforcement agencies. The system supports safeguarding, crime prevention and detection, and the protection of communities. PND is designated Critical National Infrastructure (CNI), with all users required to complete College of Policing training. In January 2024, the programme received approval for a £385.6m whole-life Full Business Case to deliver the PND 1.5 Transformation, aiming to extend service life, address technical debt, enable cloud migration, and modernise the service. Delivery challenges led to the programme being paused in June 2025. A revised delivery approach was subsequently adopted, focusing on stabilisation and sustainment through insourcing services into a Home Office data centre and addressing risks associated with legacy systems. This approach, and associated funding, was approved by the Investment Committee in March 2026. The programme is now focused on maintaining service continuity, transitioning away from the existing supplier arrangement, stabilising operations, and undertaking discovery to inform longer-term transformation options.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"At Q4 2025/26, the programme’s Delivery Confidence Assessment (DCA) improved to Amber (from Q4 2024/25). This reflects increased confidence following the decision to revise the delivery approach and focus on insourcing the PND service. Progress has been made in addressing delivery risks and constraints, including the development and review of a supplier-led plan to support insourcing. A refreshed Programme Business Case was developed and approved by the Home Office Investment Committee, supported by engagement with key stakeholders, including policing partners. In January 2026, the programme underwent an Assurance of Action Plan Review, which resulted in an Amber rating. The review recognised improvements in programme delivery confidence, supported by strengthened stakeholder engagement, effective communications, and a continued focus on collaboration and knowledge sharing.","startDate":"2024-01-18","endDate":null,"scheduleNarrative":"At Q4 2025/26, the forecast end date moved from 31 March 2026 to 27 October 2027. This reflects the revised delivery approach following the decision to pivot to an insourcing model. A delivery plan was developed with the incumbent supplier to support transition and contract exit, including an updated exit plan covering service transition arrangements. This plan sets out key milestones aligned to the insourcing approach, with delivery expected to commence in April 2026, service transition completed by July 2027, and an early-life support period extending to October 2027. The revised schedule reflects the prioritisation of a safe and secure transition, given the Critical National Infrastructure status of PND.","fyBaseline":53.69,"fyForecast":13.84,"fyVariance":74.22,"varianceNarrative":"At Q4 2025/26, the programme reports a budget variance exceeding 5%. This reflects the revised delivery approach following the decision to pivot to an insourcing model. The change in approach was driven by risks to service continuity, including the ageing platform, increasing instability, and its inability to meet modern security standards. The revised Programme Business Case therefore prioritises service sustainment, continuity, and essential preparatory activity to enable future transformation. As a result of replanning, in-year costs have reduced, reflecting the pause in previously planned transformation activity and associated milestone payments. The revised scope also results in a reduction in whole-life cost and associated benefits compared to earlier forecasts.","wholeLifeCost":282.64,"costNarrative":"At Q4 2025/26, the departmentally agreed Whole Life Cost decreased from £387.64m to £289.42m. This reflects the revised delivery approach following the decision to pivot to an insourcing model. The change in approach was driven by risks to service continuity, including the ageing platform, increasing instability, and its inability to meet modern security standards. The revised Programme Business Case therefore prioritises service sustainment, continuity, and essential preparatory activity to enable future transformation. As a result of replanning, in year costs have reduced due to the pause in previously planned transformation activity and associated milestone payments. The reduced scope also results in a lower overall whole-life cost and a corresponding reduction in forecast benefits.","benefits":39.75,"benefitsNarrative":"At Q4 2025/26, the departmentally agreed benefits decreased from £639.31m to £43.1m. This reflects the revised delivery approach following the decision to pivot to an insourcing model. The change in approach was driven by risks to service continuity, including the ageing platform, increasing instability, and its inability to meet modern security standards. The revised Programme Business Case therefore prioritises service sustainment, continuity, and essential preparatory activity to enable future transformation. As a result of replanning and the reduced scope of transformation activity, forecast benefits have decreased. However, the longer-term benefits associated with modernisation and transformation remain achievable and will be explored through a future Business Case.","themes":["Delivery & schedule","Approvals & decisions","Cost & funding","Governance & assurance"],"evidenceExcerpt":"At Q4 2025/26, the programme’s Delivery Confidence Assessment (DCA) improved to Amber (from Q4 2024/25). This reflects increased confidence following the decision to revise the delivery approach and focus on insourcing the PND service. Progress has been made in addressing delivery risks and constraints, including the development and review of a supplier-led…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"At Q4 2025/26, the forecast end date moved from 31 March 2026 to 27 October 2027. This reflects the revised delivery approach following the decision to pivot to an insourcing model. A delivery plan was developed with the incumbent supplier to support transition and contract exit, including an updated exit plan covering service transition arrangements. This plan sets out key milestones aligned to the insourcing approach, with delivery expected to commence in April 2026, service transition completed by July 2027, and an early-life support period extending to October 2027. The revised schedule reflects the prioritisation of a safe and secure transition, given the Critical National Infrastructure status of PND.","narrativeClaimKind":null}],"previous":{"id":"HO_0331_2324-Q4","year":2025,"name":"Police National Database (PND)","department":"HO","category":"ICT","description":"Police National Database (PND) Programme aims to: • Ensure Business Continuity of the PND Service as Critical National Infrastructure (CNI) to a 5-10 year horizon • Transition PND to cloud-native architecture and migrate hosting to the Law Enforcement Cloud Platform (LECP) • Replace or update obsolescent technology components, specifically Oracle database & middleware, and Initiate names matching which is unsupported • Improve the usability of the system, be intuitive and easy to navigate, with viewable and meaningful search results that can be exported and shared as required by operational policing • Deliver PND Application Programming Interface (APIs) that enable export and analysis of PND data and expose APIs for federated searching across national police data sets • Enable PND to continue to act as a national source of info for organised crime, organised crime groups, including county lines, modern slavery, and human trafficking until such time as it replaced by the future data strategy agreed by policing and Public Safety Group (PSG) • From a Commercial perspective the HO will need to align the migration to Law Enforcement Cloud Platform (LECP) and transition to a new contract for run, maintenance and support (the current contract with the incumbent supplier is due to expire end of March 2026. On the 15th May Investment Committee rejected the suppliers Contract Change Notice. As a result, the board approved a pivot in delivery to in source the service, negating the need for a procurement to be run.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 decreased from AMBER to RED. This is primarily due to the following factors‚ Ten months ago, the Home Office received a Milestone Impact Assessment highlighting a five-month delay to delivery. Since then, the Home Office has collaborated closely with the supplier to undertake a comprehensive review of the end-to-end delivery plan. This included significantly increasing commercial support and initiating a full programme reset. On 15 May 2025, the Investment Committee (InvestCo) declined the proposed Contract Change Notification and instead chose to pursue a contingency option. The programme is now preparing for a further NISTA-led Gate 0/3 Review, which will evaluate the progress of the contingency approach and inform updates to the Full Business Case ahead of the next InvestCo meeting in December 2025.","startDate":"2024-01-18","endDate":"2026-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2026. This is primarily due to the following factors‚ Ten months ago, the Home Office received a Milestone Impact Assessment highlighting a five-month delay to delivery. Since then, the Home Office has collaborated closely with the supplier to undertake a comprehensive review of the end-to-end delivery plan. This included significantly increasing commercial support and initiating a full programme reset. On 15 May 2025, the Investment Committee (InvestCo) declined the proposed Contract Change Notification and instead chose to pursue a contingency option. The programme is now preparing for a further NISTA-led Gate 0/3 Review, which will evaluate the progress of the contingency approach and inform updates to the Full Business Case ahead of the next InvestCo meeting in December 2025.","fyBaseline":77.93,"fyForecast":55.66,"fyVariance":28.58,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The programme has suffered some delays in delivery and subsequently some planned delivery milestone payments have not yet fallen due.","wholeLifeCost":387.64,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 395 to 387. This is primarily due to the following factors‚ The cause for a decrease in Whole Life Costs is due to the removal of optimism bias costs from the previous financial year 2024/2025.","benefits":639.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 639. This is primarily due to the following factors‚ The programme is updating a revised version of the business case by December 2025. This will include a full review of the strategic objectives and benefits. However, our initial assessment shows that majority are still achievable, even through delivery of a contingency option.","themes":["Delivery & schedule","Cost & funding","Commercial & supply chain","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 decreased from AMBER to RED. This is primarily due to the following factors‚ Ten months ago, the Home Office received a Milestone Impact Assessment highlighting a five-month delay to delivery. Since then, the Home Office has…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2026. This is primarily due to the following factors‚ Ten months ago, the Home Office received a Milestone Impact Assessment highlighting a five-month delay to delivery. Since then, the Home Office has collaborated closely with the supplier to undertake a comprehensive review of the end-to-end delivery plan. This included significantly increasing commercial support and initiating a full programme reset. On 15 May 2025, the Investment Committee (InvestCo) declined the proposed Contract Change Notification and instead chose to pursue a contingency option. The programme is now preparing for a further NISTA-led Gate 0/3 Review, which will evaluate the progress of the contingency approach and inform updates to the Full Business Case ahead of the next InvestCo meeting in December 2025.","narrativeClaimKind":null},"ratingDelta":-1,"transition":"Improved","endDateDeltaDays":null,"attentionScore":33,"attentionReasons":["Current published delivery confidence is Amber","In-year forecast variance is +74.2%"]},{"id":"MOJ_0539_2526-Q2","year":2026,"name":"Residential Property Tribunal","department":"MOJ","category":"Government Transformation and Service Delivery","description":"The Residential Property Tribunal (RPT) Project is responsible for delivering HMCTS’s responsibilities arising from the Renters Rights Act (RRA), introduced by Ministry of Housing Communities and Local Government (MHCLG). The project is delivering new operating delivery models, tactical and strategic IT solutions, recruitment of staff and the estate space to house them, alongside wider legislative implementation as well as judicial and subject matter expert recruitment activities.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Delivery Confidence Assessment (DCA) for financial year 25/26-Q4 is Amber. This is driven by complexities in aligning policy, legal and delivery partners on future digitalisation.","startDate":"2024-06-11","endDate":"2028-03-31","scheduleNarrative":"The project's end date at 25/26-Q4 is scheduled for 31/03/2028. This is primarily due to the following factors‚ The project is on track to deliver against the baseline schedule.","fyBaseline":27.08,"fyForecast":5.73,"fyVariance":78.84,"varianceNarrative":"The budget exceeds 5%. In year variance against budget primarily driven by delays in design, discovery and recruitment as a result of the delays in the Bill acquiring Royal Assent.","wholeLifeCost":149.6,"costNarrative":"The project's Whole Life Costs in 25/26-Q4 are £149.6m. The Whole Life Costs are based on the most recent business case and include optimism bias. All costs have been reported in 2024/25 base prices in line with NISTA requirements. This is a change from previous years where costs were reported in nominal prices. All costs reflect this accounting reduction regardless of any actual changes.","benefits":null,"benefitsNarrative":"There are no monetised benefits to the project.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Scope & requirements"],"evidenceExcerpt":"The Delivery Confidence Assessment (DCA) for financial year 25/26-Q4 is Amber. This is driven by complexities in aligning policy, legal and delivery partners on future digitalisation. The project's end date at 25/26-Q4 is scheduled for 31/03/2028. This is primarily due to the following factors‚ The project is on track to deliver against the baseline…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end date at 25/26-Q4 is scheduled for 31/03/2028. This is primarily due to the following factors‚ The project is on track to deliver against the baseline schedule.","narrativeClaimKind":null,"history":[{"id":"MOJ_0539_2526-Q2","year":2026,"name":"Residential Property Tribunal","department":"MOJ","category":"Government Transformation and Service Delivery","description":"The Residential Property Tribunal (RPT) Project is responsible for delivering HMCTS’s responsibilities arising from the Renters Rights Act (RRA), introduced by Ministry of Housing Communities and Local Government (MHCLG). The project is delivering new operating delivery models, tactical and strategic IT solutions, recruitment of staff and the estate space to house them, alongside wider legislative implementation as well as judicial and subject matter expert recruitment activities.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Delivery Confidence Assessment (DCA) for financial year 25/26-Q4 is Amber. This is driven by complexities in aligning policy, legal and delivery partners on future digitalisation.","startDate":"2024-06-11","endDate":"2028-03-31","scheduleNarrative":"The project's end date at 25/26-Q4 is scheduled for 31/03/2028. This is primarily due to the following factors‚ The project is on track to deliver against the baseline schedule.","fyBaseline":27.08,"fyForecast":5.73,"fyVariance":78.84,"varianceNarrative":"The budget exceeds 5%. In year variance against budget primarily driven by delays in design, discovery and recruitment as a result of the delays in the Bill acquiring Royal Assent.","wholeLifeCost":149.6,"costNarrative":"The project's Whole Life Costs in 25/26-Q4 are £149.6m. The Whole Life Costs are based on the most recent business case and include optimism bias. All costs have been reported in 2024/25 base prices in line with NISTA requirements. This is a change from previous years where costs were reported in nominal prices. All costs reflect this accounting reduction regardless of any actual changes.","benefits":null,"benefitsNarrative":"There are no monetised benefits to the project.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Scope & requirements"],"evidenceExcerpt":"The Delivery Confidence Assessment (DCA) for financial year 25/26-Q4 is Amber. This is driven by complexities in aligning policy, legal and delivery partners on future digitalisation. The project's end date at 25/26-Q4 is scheduled for 31/03/2028. This is primarily due to the following factors‚ The project is on track to deliver against the baseline…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end date at 25/26-Q4 is scheduled for 31/03/2028. This is primarily due to the following factors‚ The project is on track to deliver against the baseline schedule.","narrativeClaimKind":null}],"previous":null,"ratingDelta":null,"transition":"Not comparable","endDateDeltaDays":null,"attentionScore":33,"attentionReasons":["Current published delivery confidence is Amber","In-year forecast variance is +78.8%"]},{"id":"DFE_0017_2021-Q3","year":2026,"name":"Skills Bootcamps","department":"DWP","category":"Government Transformation and Service Delivery","description":"Skills Bootcamps are free training courses for adults typically lasting up to 16 weeks, available across a range of sectors. They help people develop priority skills that are in demand at both local and national level. They are developed by training providers in partnership with employers. Skills Bootcamps have previously been delivered through two routes: national contracts managed in the Skills Bootcamps team in DfE, and grant funding to local areas which then procure and manage their own Skills Bootcamps to meet local skills needs. However, the Secretary of State for Education confirmed on 31 July 2024 that we do not expect to undertake any further national procurement at this time. The current national contracts will end live delivery by 31/07/2025 and conclude by 31/01/2026. The National delivery of the programme will end on the 31/03/2026. In addition, in line with Government priorities and as set out in the English Devolution Framework White Paper on 16/12/24, the Work Based Skills Directorate will be working to devolve delivery to local areas, beginning with two Mayoral Combined Authorities in 2025-26 and expanding more widely in 2026-27. Devolved local areas will receive un-ringfenced funding to deliver skills provision in their areas that will best meet their local needs. This move away from centrally managed national contracts and towards devolved delivery will involve much less active management and monitoring of delivery quality and outcomes and therefore a much smaller team, and Skills Bootcamps is expected to close as a government major programme, having successfully completed the Gate 5 review in June 2025, and all six recommendations being met and signed-off by the DWP Delivery and Performance Board by 16/04/2026. Off boarding is likely to be completed by 31/05/2026.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at AMBER. There remain workload pressures, but the resource position is currently stable. We are currently working to resolve staff allocated to the national contract programme as we transition into BAU. The risk of overspend the Skills Bootcamps programme budget in FY2025-26, is due to stronger-than-expected performance in local areas, resulting in the budget being allocated more quickly than expected. DWP has agreed to cover a significant proportion of the financial shortfall. Costs for the on-going legal challenge and legal claim are still on-going and are yet to be finalised. This will also transfer to DWP. Mitigations have been undertaken and senior colleagues have been in discussions with DWP, who have agreed to cover a substantial proportion of the financial shortfall. Grant activity and other related functions will continue as part of BAU operations as this work transitions to DWP.","startDate":"2020-04-01","endDate":null,"scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same as 31/05/2026. National delivery of the programme will end on the 31/03/2026. We expect that the programme will exit the GMPP on the 31/05/2026, as Mayoral Strategic Authorities (MSAs) increasingly assume responsibility for adult skills delivery from FY26-27.","fyBaseline":123.11,"fyForecast":199.54,"fyVariance":62.08,"varianceNarrative":"The in-year variance exceeds 5%. This is primarily due to the following factors: The Skills Bootcamps programme is demand-led and thus is challenging to forecast accurately due to the large uncertainty. Over the course of the 25-26FY we found spend increased partly due to a greater number of learners beginning on the construction skills package national contracts than we initially forecast, alongside a stronger level of programme performance on grants delivery.","wholeLifeCost":790.39,"costNarrative":"The programmes whole life costs are £790.39m (when applying an inflator). The winding down of national delivery means that spend in more recent years is lower than in previous years due to spend now only being on grants delivery.","benefits":null,"benefitsNarrative":"We intend to develop a more robust baseline once the London School of Economics (LSE) Impact Evaluation of Waves 2 and 3 has been completed which will compare the outcomes of individuals who receive the intervention to a statistically matched comparison group and/or other econometric methods. The Impact Evaluation is scheduled to be available internally towards the end of 2026. It is too early in delivery to provide a forecast for FY25/26 as courses can run up to 31 March 2026, and providers then have a six-month window following the completion of the training to claim a positive outcome. The Impact Evaluation will compare the outcomes of individuals who receive the intervention to a statistically matched comparison group and/or other econometric methods. We envisage that that this will give us an improved baseline in the future.","themes":["Cost & funding","Delivery & schedule","Workforce & capability","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at AMBER. There remain workload pressures, but the resource position is currently stable. We are currently working to resolve staff allocated to the national contract programme as we transition into BAU. The risk of overspend the Skills Bootcamps…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same as 31/05/2026. National delivery of the programme will end on the 31/03/2026. We expect that the programme will exit the GMPP on the 31/05/2026, as Mayoral Strategic Authorities (MSAs) increasingly assume responsibility for adult skills delivery from FY26-27.","narrativeClaimKind":null,"history":[{"id":"DFE_0017_2021-Q3","year":2021,"name":"National Skills Fund","department":"DFE","category":"Government Transformation and Service Delivery","description":"The National Skills Fund (NSF) will fund projects that will help people retrain and upskill into better, more productive jobs through developing higher and intermediate skills, and aligned with Further Education","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber.This is primarily due to the following factors: The National Skills Fund programme remains broadly on schedule, with delivery of L3 Adult Offer and Uplift funding meeting the agreed milestone date. The Bootcamps procurement and launch of wave 2 remains mostly on schedule, with staggered starts introduced to accommodate further work on the procurement of Lot 1. The National Skills Fund also remains on schedule, although the recent merger with the Funding and Accountability consultation does present some challenges to delivering in line with agreed milestone.","startDate":"2020-04-01","endDate":"2024-03-31","scheduleNarrative":"The project end-date is 31 March 2024. This is primarily due to the following factors: The programme end date reflects the financial commitment to fund the National Skills Fund until the end of this parliament. By this point the programme will have delivered on various interventions to fill the gaps in adult skills in key sectors and assist learners in achieving better jobs, including the Level 3 Adult Offer and Bootcamps. The timeline is driven by the need to deliver these interventions in a way that allows initial delivery to inform future design, accommodate the consultation on adult skills and align with the wider adult skills reform work.","fyBaseline":8.0,"fyForecast":8.0,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":1148.78,"costNarrative":"The projects Baseline Whole Life Cost is �1148.78m. This is primarily due to the following factors: Whole Life Budgeted Costs reflect the preliminary costs currently within scope","benefits":null,"benefitsNarrative":"","themes":["Delivery & schedule","Cost & funding","Workforce & capability","Commercial & supply chain"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber.This is primarily due to the following factors: The National Skills Fund programme remains broadly on schedule, with delivery of L3 Adult Offer and Uplift funding meeting the agreed milestone date. The Bootcamps procurement and launch of wave 2 remains mostly on schedule,…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project end-date is 31 March 2024. This is primarily due to the following factors: The programme end date reflects the financial commitment to fund the National Skills Fund until the end of this parliament. By this point the programme will have delivered on various interventions to fill the gaps in adult skills in key sectors and assist learners in achieving better jobs, including the Level 3 Adult Offer and Bootcamps. The timeline is driven by the need to deliver these interventions in a way that allows initial delivery to inform future design, accommodate the consultation on adult skills and align with the wider adult skills reform work.","narrativeClaimKind":null},{"id":"DFE_0017_2021-Q3","year":2022,"name":"Skills Bootcamps and Free Courses for Jobs","department":"DFE","category":"Government Transformation and Service Delivery","description":"The National Skills Fund (NSF) will fund projects that will help people retrain and upskill into better, more productive jobs through developing higher and intermediate skills, and aligned with Further Education.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 remained at Amber The National Skills Fund remains broadly on schedule following the spending review funding has been confirmed for both Free Courses for Jobs and Skills Bootcamps with exact spending to be agreed following submission of relevant business cases. Free Courses for Jobs extension to Independent Training Providers has been approved and on schedule to deliver at the beginning of 22/23 academic year. Skills Bootcamps Wave 3 procurement is on schedule with work on the dynamic purchasing system for future Skills Bootcamps delivery in progress. Delivery remains challenging due to resourcing but recent approvals for recruitment should see this barrier reduce over Q1/Q2 of the next reporting year. With the design for both interventions now baselined, the programme is looking at transitioning to business as usual and realisation of benefits.","startDate":"2020-04-01","endDate":"2024-03-31","scheduleNarrative":"Compared to 2021-Q4, your project end-date remained scheduled to finish on 31 MAR 2024 . This is primarily due to the following factors: The programme end date reflects the financial commitment to fund the National Skills Fund until the end of this parliament. By this point the programme will have delivered on various interventions to fill the gaps in adult skills in key sectors and assist learners in achieving better jobs, including the Free Courses for Jobs and Skills Bootcamps. The timeline is driven by the need to deliver these interventions in a way that allows initial delivery to inform future design, accommodate the consultation on adult skills and align with the wider adult skills reform work.","fyBaseline":138.0,"fyForecast":110.2,"fyVariance":-20.0,"varianceNarrative":"The budget variance exceeds 5%. Variance between forecast and baseline due to underspends on Free Courses for Jobs and Skills Bootcamps. Underspend caused by limits on provider/learner capacity to expand Free Courses for Jobs offer any more quickly and delays in Skills Bootcamps starts meaning, for some, part of the costs for completion and outcome milestones falling into the next year.","wholeLifeCost":1149.0,"costNarrative":"Compared to 2021-Q4,the projects Baseline Whole Life Cost remained at 1148.78 (£m). This is primarily due to the following factors: Whole Life Budgeted Costs reflect the preliminary costs currently within scope","benefits":null,"benefitsNarrative":"","themes":["Workforce & capability","Delivery & schedule","Cost & funding","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 remained at Amber The National Skills Fund remains broadly on schedule following the spending review funding has been confirmed for both Free Courses for Jobs and Skills Bootcamps with exact spending to be agreed following submission…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to 2021-Q4, your project end-date remained scheduled to finish on 31 MAR 2024 . This is primarily due to the following factors: The programme end date reflects the financial commitment to fund the National Skills Fund until the end of this parliament. By this point the programme will have delivered on various interventions to fill the gaps in adult skills in key sectors and assist learners in achieving better jobs, including the Free Courses for Jobs and Skills Bootcamps. The timeline is driven by the need to deliver these interventions in a way that allows initial delivery to inform future design, accommodate the consultation on adult skills and align with the wider adult skills reform work.","narrativeClaimKind":null},{"id":"DFE_0017_2021-Q3","year":2023,"name":"Skills Bootcamps and Free Courses for Jobs","department":"DFE","category":"Government Transformation and Service Delivery","description":"The National Skills Fund (NSF) helps people retrain and upskill into better, more productive jobs through developing higher and intermediate skills, and aligned with Further Education. The project is comprised of two offers, Skills Bootcamps and Free Courses for Jobs.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. The National Skills Fund programme remains broadly on schedule, with delivery of Free Courses for Jobs meeting agreed milestones and exceeding delivery trajectories. Skills Bootcamps dynamic purchasing system has delivered to agreed milestones although risks remain around the expansion of starts numbers in 2023/24 and whether this will be fully achieved by planned procurement.","startDate":"2020-04-01","endDate":"2024-03-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2024-03-31. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2024-03-31. This is primarily due to the following factors. The project end-date is 31 March 2024. This is primarily due to the following factors: The programme end date reflects the financial commitment to fund the National Skills Fund until the end of this parliament. By this point the programme will have delivered on various interventions to fill the gaps in adult skills in key sectors and assist learners in achieving better jobs, including the Free Courses for Jobs Offer and Skill Bootcamps. The timeline is driven by the need to deliver these interventions in a way that allows initial delivery to inform future design, accommodate the consultation on adult skills and align with the wider adult skills reform work.","fyBaseline":150.0,"fyForecast":107.2,"fyVariance":-29.0,"varianceNarrative":"The budget variance exceeds 5%. The delivery profile for the programme moved later in the financial year moving some delivery and associated expenditure into 2023/24.","wholeLifeCost":696.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 decreased from 1149m. to 696m. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 decreased from 1149m. to 696m. This is primarily due to the following factors. The whole life cost reported last year being based on initial estimates which have now been revised in the latest business case.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. The project did not provide departmental-agree monetised benefits at 22/23-Q4. Not applicable, no monetised benefits realised by this programme","themes":["Cost & funding","Delivery & schedule","Workforce & capability","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. The National Skills Fund programme remains broadly on schedule, with delivery of Free Courses for Jobs meeting agreed milestones and exceeding delivery trajectories.…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2024-03-31. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2024-03-31. This is primarily due to the following factors. The project end-date is 31 March 2024. This is primarily due to the following factors: The programme end date reflects the financial commitment to fund the National Skills Fund until the end of this parliament. By this point the programme will have delivered on various interventions to fill the gaps in adult skills in key sectors and assist learners in achieving better jobs, including the Free Courses for Jobs Offer and Skill Bootcamps. The timeline is driven by the need to deliver these interventions in a way that allows initial delivery to inform future design, accommodate the consultation on adult skills and align with the wider adult skills reform work.","narrativeClaimKind":null},{"id":"DFE_0017_2021-Q3","year":2024,"name":"Skills Bootcamps","department":"DFE","category":"Government Transformation and Service Delivery","description":"Skills Bootcamps are free training courses for adults typically lasting up to 16 weeks, available across a range of sectors. They help people develop priority skills that are in demand at both local and national level. They are developed by training providers in partnership with employers. Significant investment has been committed by the government to scale up Skills Bootcamps from 2022 to 2025.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. The Infrastructure Project Authority has not yet communicated a Delivery Confidence Assessment to the project. (We expect to schedule an IPA Gateway review in summer 2024.) The SRO's DCA is Amber. The Skills Bootcamps programme remains broadly on schedule, with learner starts continuing to exceed targets, though volatility in the supplier market creates risk. Work is underway both to improve the programme's underlying data architecture to support delivery at greater scale, and to work with suppliers to drive up quality of provision.","startDate":"2020-04-01","endDate":"2026-05-29","scheduleNarrative":"The project's end-date at 23/24-Q4 is 2026-05-29. This is primarily due to the following factors. Compared to 2223-Q4, the scheduled project end-date has changed from 31 MAR 2024 to 29 MAY 2026. This is primarily due to: gaining approval and funding for a further round of Skills Bootcamps delivery commencing 1 FEB 2024 and expected to conclude 28 FEB 2026; work to improve the programme's underlying data architecture underway and scheduled to conclude 30 APR 2025. The data architecture work is expected to deliver a more stable, longer-term delivery solution for Skills Bootcamps that will enable the programme to offboard from the GMPP, subject to further approval.","fyBaseline":200.0,"fyForecast":154.7,"fyVariance":-23.0,"varianceNarrative":"The budget variance exceeds 5%. The budget variance exceeds 5%. The delivery profile for the programme in FY 2023-24 was based on initial estimates that have now been revised in our latest forecasts.","wholeLifeCost":640.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 23/24-Q4 is 640m. This is primarily due to the following factors. 00 (m) to 640.25 (m). This is primarily due to the following factors: 1) the whole-life cost reported last year was based on initial estimates that have now been revised in our latest forecasts and revised in the latest business case.","benefits":0.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 0m. The programme's departmental-agreed monetised benefits at FY23/24 is 0m.","themes":["Delivery & schedule","Cost & funding","Approvals & decisions","Technical & integration"],"evidenceExcerpt":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. The Infrastructure Project Authority has not yet communicated a Delivery Confidence Assessment to the project. (We expect to schedule an IPA Gateway review in summer 2024.) The SRO's DCA is Amber. The Skills Bootcamps…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 23/24-Q4 is 2026-05-29. This is primarily due to the following factors. Compared to 2223-Q4, the scheduled project end-date has changed from 31 MAR 2024 to 29 MAY 2026. This is primarily due to: gaining approval and funding for a further round of Skills Bootcamps delivery commencing 1 FEB 2024 and expected to conclude 28 FEB 2026; work to improve the programme's underlying data architecture underway and scheduled to conclude 30 APR 2025. The data architecture work is expected to deliver a more stable, longer-term delivery solution for Skills Bootcamps that will enable the programme to offboard from the GMPP, subject to further approval.","narrativeClaimKind":null},{"id":"DFE_0017_2021-Q3","year":2025,"name":"SKILLS BOOTCAMPS","department":"DfE","category":"Government Transformation and Service Delivery","description":"Skills Bootcamps is a project to deliver free courses for adults typically lasting up to 16 weeks, available across a range of sectors. Developed by training providers working in partnership with employers, Skills Bootcamps help people develop priority skills that are in demand at both local and national level.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The project has not yet been re-assessed through a NISTA Gateway Review, though one is planned for June 2025.","startDate":"2020-04-01","endDate":"2026-05-29","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 29/05/2026. This is primarily due to the following factors‚ We expect that the programme will exit the GMPP as Mayoral Strategic Authorities increasingly assume responsibility for adult skills delivery from FY26-27.","fyBaseline":233.9,"fyForecast":227.2,"fyVariance":2.86,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":785.55,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 640 to 785. This is primarily due to the following factors‚ Following the 2024 Autumn Budget and Spending Review, the programme received additional funding to enable a further year of delivery in FY25/26, in local areas and Established Mayoral Strategic Authorities receiving integrated settlements.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ This is unchanged from last year – no monetised benefits have been calculated for this project.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The project has not yet been re-assessed through a NISTA Gateway Review, though one is planned for June 2025. Compared to financial year 23/24-Q4, the project's…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 29/05/2026. This is primarily due to the following factors‚ We expect that the programme will exit the GMPP as Mayoral Strategic Authorities increasingly assume responsibility for adult skills delivery from FY26-27.","narrativeClaimKind":null},{"id":"DFE_0017_2021-Q3","year":2026,"name":"Skills Bootcamps","department":"DWP","category":"Government Transformation and Service Delivery","description":"Skills Bootcamps are free training courses for adults typically lasting up to 16 weeks, available across a range of sectors. They help people develop priority skills that are in demand at both local and national level. They are developed by training providers in partnership with employers. Skills Bootcamps have previously been delivered through two routes: national contracts managed in the Skills Bootcamps team in DfE, and grant funding to local areas which then procure and manage their own Skills Bootcamps to meet local skills needs. However, the Secretary of State for Education confirmed on 31 July 2024 that we do not expect to undertake any further national procurement at this time. The current national contracts will end live delivery by 31/07/2025 and conclude by 31/01/2026. The National delivery of the programme will end on the 31/03/2026. In addition, in line with Government priorities and as set out in the English Devolution Framework White Paper on 16/12/24, the Work Based Skills Directorate will be working to devolve delivery to local areas, beginning with two Mayoral Combined Authorities in 2025-26 and expanding more widely in 2026-27. Devolved local areas will receive un-ringfenced funding to deliver skills provision in their areas that will best meet their local needs. This move away from centrally managed national contracts and towards devolved delivery will involve much less active management and monitoring of delivery quality and outcomes and therefore a much smaller team, and Skills Bootcamps is expected to close as a government major programme, having successfully completed the Gate 5 review in June 2025, and all six recommendations being met and signed-off by the DWP Delivery and Performance Board by 16/04/2026. Off boarding is likely to be completed by 31/05/2026.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at AMBER. There remain workload pressures, but the resource position is currently stable. We are currently working to resolve staff allocated to the national contract programme as we transition into BAU. The risk of overspend the Skills Bootcamps programme budget in FY2025-26, is due to stronger-than-expected performance in local areas, resulting in the budget being allocated more quickly than expected. DWP has agreed to cover a significant proportion of the financial shortfall. Costs for the on-going legal challenge and legal claim are still on-going and are yet to be finalised. This will also transfer to DWP. Mitigations have been undertaken and senior colleagues have been in discussions with DWP, who have agreed to cover a substantial proportion of the financial shortfall. Grant activity and other related functions will continue as part of BAU operations as this work transitions to DWP.","startDate":"2020-04-01","endDate":null,"scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same as 31/05/2026. National delivery of the programme will end on the 31/03/2026. We expect that the programme will exit the GMPP on the 31/05/2026, as Mayoral Strategic Authorities (MSAs) increasingly assume responsibility for adult skills delivery from FY26-27.","fyBaseline":123.11,"fyForecast":199.54,"fyVariance":62.08,"varianceNarrative":"The in-year variance exceeds 5%. This is primarily due to the following factors: The Skills Bootcamps programme is demand-led and thus is challenging to forecast accurately due to the large uncertainty. Over the course of the 25-26FY we found spend increased partly due to a greater number of learners beginning on the construction skills package national contracts than we initially forecast, alongside a stronger level of programme performance on grants delivery.","wholeLifeCost":790.39,"costNarrative":"The programmes whole life costs are £790.39m (when applying an inflator). The winding down of national delivery means that spend in more recent years is lower than in previous years due to spend now only being on grants delivery.","benefits":null,"benefitsNarrative":"We intend to develop a more robust baseline once the London School of Economics (LSE) Impact Evaluation of Waves 2 and 3 has been completed which will compare the outcomes of individuals who receive the intervention to a statistically matched comparison group and/or other econometric methods. The Impact Evaluation is scheduled to be available internally towards the end of 2026. It is too early in delivery to provide a forecast for FY25/26 as courses can run up to 31 March 2026, and providers then have a six-month window following the completion of the training to claim a positive outcome. The Impact Evaluation will compare the outcomes of individuals who receive the intervention to a statistically matched comparison group and/or other econometric methods. We envisage that that this will give us an improved baseline in the future.","themes":["Cost & funding","Delivery & schedule","Workforce & capability","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at AMBER. There remain workload pressures, but the resource position is currently stable. We are currently working to resolve staff allocated to the national contract programme as we transition into BAU. The risk of overspend the Skills Bootcamps…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same as 31/05/2026. National delivery of the programme will end on the 31/03/2026. We expect that the programme will exit the GMPP on the 31/05/2026, as Mayoral Strategic Authorities (MSAs) increasingly assume responsibility for adult skills delivery from FY26-27.","narrativeClaimKind":null}],"previous":{"id":"DFE_0017_2021-Q3","year":2025,"name":"SKILLS BOOTCAMPS","department":"DfE","category":"Government Transformation and Service Delivery","description":"Skills Bootcamps is a project to deliver free courses for adults typically lasting up to 16 weeks, available across a range of sectors. Developed by training providers working in partnership with employers, Skills Bootcamps help people develop priority skills that are in demand at both local and national level.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The project has not yet been re-assessed through a NISTA Gateway Review, though one is planned for June 2025.","startDate":"2020-04-01","endDate":"2026-05-29","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 29/05/2026. This is primarily due to the following factors‚ We expect that the programme will exit the GMPP as Mayoral Strategic Authorities increasingly assume responsibility for adult skills delivery from FY26-27.","fyBaseline":233.9,"fyForecast":227.2,"fyVariance":2.86,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":785.55,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 640 to 785. This is primarily due to the following factors‚ Following the 2024 Autumn Budget and Spending Review, the programme received additional funding to enable a further year of delivery in FY25/26, in local areas and Established Mayoral Strategic Authorities receiving integrated settlements.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ This is unchanged from last year – no monetised benefits have been calculated for this project.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The project has not yet been re-assessed through a NISTA Gateway Review, though one is planned for June 2025. Compared to financial year 23/24-Q4, the project's…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 29/05/2026. This is primarily due to the following factors‚ We expect that the programme will exit the GMPP as Mayoral Strategic Authorities increasingly assume responsibility for adult skills delivery from FY26-27.","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":null,"attentionScore":33,"attentionReasons":["Current published delivery confidence is Amber","In-year forecast variance is +62.1%"]},{"id":"FCO_0216_2223-Q4","year":2026,"name":"TOKYO NEW BUILD, REMODELLING AND REFURBISHMENT","department":"FCDO","category":"Infrastructure and Construction","description":"Refurbishment and remodelling of key buildings on the British Embassy Tokyo compound. The project will address end of life and failing assets through repair and replacement, it will prevent further deterioration and increasing danger of structural damage to the historic buildings and it will provide fit for purpose facilities. The existing buildings fail to fully meet health and safety requirements and are not suitable for a modern and sustainable 21st century office working environment. This significant investment will future proof our ability to deliver diplomatic and operational solutions in one of our most important global posts.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at AMBER.","startDate":"2022-06-01","endDate":null,"scheduleNarrative":"Compared to financial year 24/25 Q4, the projects end date at 25/26 Q4 remains at 1/12/2031. This is primarily due to the following factors: the successful awarding of the Phase 1 contract in January 26 to a leading Tier 1 Japanese contractor, the strategic decision to prioritise Phase 2 ahead of Phase 3 - ensuring resources are directed towards the most critical elements of the project - and the valuable insights gained from Phase 1, which are being leveraged to improve delivery of the subsequent phases. These elements collectively contribute to maintaining the established timeline and reinforcing the project's overall stability.","fyBaseline":3.13,"fyForecast":1.58,"fyVariance":49.57,"varianceNarrative":"The budget variance exceeds 5%. This is due to: the contractors requesting an extension of the tender period so that they could familiarise themselves with UK specific requirements (both contract terms and building standards); and the approval of the Full Business Case taking longer than had been allowed for in the project programme. This led to a delay in contract award and hence a reduction in spend in 2025/26. The contract was awarded in January 2026.","wholeLifeCost":111.25,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) increased from 101 to 120. This is primarily due to the following factors: inclusion of additional scope to deliver additional benefits, as well as further refinement in the design. The revised baseline was agreed by both FCDO and HMT in late 2026, ensuring alignment with updated project requirements and financial parameters.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors: the project is still in the early stages of development - we would expect to be able to calculate monetised benefits at the end of the RIBA Stage 4 design (Autumn 2026). Assuming proper maintenance admin savings are expected through reduced spend on utilities and maintenance.","themes":["Cost & funding","Commercial & supply chain","Approvals & decisions","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at AMBER. Compared to financial year 24/25 Q4, the projects end date at 25/26 Q4 remains at 1/12/2031. This is primarily due to the following factors: the successful awarding of the Phase 1 contract in January 26 to a leading Tier 1 Japanese…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25 Q4, the projects end date at 25/26 Q4 remains at 1/12/2031. This is primarily due to the following factors: the successful awarding of the Phase 1 contract in January 26 to a leading Tier 1 Japanese contractor, the strategic decision to prioritise Phase 2 ahead of Phase 3 - ensuring resources are directed towards the most critical elements of the project - and the valuable insights gained from Phase 1, which are being leveraged to improve delivery of the subsequent phases. These elements collectively contribute to maintaining the established timeline and reinforcing the project's overall stability.","narrativeClaimKind":null,"history":[{"id":"FCO_0216_2223-Q4","year":2024,"name":"Tokyo Compound","department":"FCDO","category":"Infrastructure and Construction","description":"The Tokyo project will refurbish and upgrade key buildings on the British Embassy compound. It is of strategic and political importance to the UK's foreign policy objectives that these buildings function in the most efficient and cost-effective manner. The buildings currently fail to fully meet health and safety requirements and the need for essential repairs has become urgent. Part of the work will prevent further deterioration and the increasing danger of structural damage to the historic building fabric of both the Residence and Chancery buildings. This significant investment will deliver a fit for purpose and sustainable 21st century working environment and future proof our ability to deliver diplomatic and operational solutions in one of our most important global posts.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. The project has recently achieved a key milestone - the delivery of the RIBA 3 Design Report (Royal Institute of British Architects plan of work identifies Stage 3 as Developed Design). FCDO has procured a Peer Review - this work has commenced and will review the design proposals to ensure that they meet the brief and offer value for money and that the tender documentation is ready to go out to the construction market. FCDO has undertaken market engagement exercises and has interest in the project. We are currently reviewing the resources and team structure to ensure that we are well prepared for the next phase of the project.","startDate":"2022-06-01","endDate":"2031-12-01","scheduleNarrative":"The project's end-date at 23/24-Q4 is 2031-12-01. This is primarily due to the following factors. The schedule allows for the tender of a design and build contract(s), development of detailed design and the delivery of the construction work over several phases to ensure that that the Embassy can continue to function.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"The GMPP project did not provide data","wholeLifeCost":100.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 23/24-Q4 is 100m. This is primarily due to the following factors. The project has secured OBC approval for 100m to cover the works to refurbish and upgrade the key buildings on the British Embassy Tokyo compound. These buildings fail to fully meet health and safety requirements and are not fit for purpose for a modern and sustainable 21st century office working environment. This significant investment will future proof our ability to deliver diplomatic and operational solutions in one of our most important global posts.","benefits":0.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 0m.","themes":["Commercial & supply chain","Delivery & schedule","Scope & requirements","Cost & funding"],"evidenceExcerpt":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. The project has recently achieved a key milestone - the delivery of the RIBA 3 Design Report (Royal Institute of British Architects plan of work identifies Stage 3 as Developed Design). FCDO has procured a Peer Review -…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 23/24-Q4 is 2031-12-01. This is primarily due to the following factors. The schedule allows for the tender of a design and build contract(s), development of detailed design and the delivery of the construction work over several phases to ensure that that the Embassy can continue to function.","narrativeClaimKind":null},{"id":"FCO_0216_2223-Q4","year":2025,"name":"TOKYO NEW BUILD, REMODELLING AND REFURBISHMENT","department":"FCDO","category":"Infrastructure and Construction","description":"Refurbishment and remodelling of key buildings on the British Embassy Tokyo compound. The project will address end of life and failing assets through repair and replacement, it will prevent further deterioration and increasing danger of structural damage to the historic buildings and it will provide fit for purpose facilities. The existing buildings fail to fully meet health and safety requirements and are not suitable for a modern and sustainable 21st century office working environment. This significant investment will future proof our ability to deliver diplomatic and operational solutions in one of our most important global posts.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. The project agrees with the Delivery Confidence Assessment rating at AMBER.","startDate":"2022-06-01","endDate":"2031-12-01","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 01/12/2031. This is primarily due to the following factors‚ The project is being delivered in phases and our current programme indicates that the end-date for the last phase remains 01/12/2031.","fyBaseline":4.0,"fyForecast":4.0,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%. The budget variance is less than or equal to 5%.","wholeLifeCost":101.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 100 to 101. This is primarily due to the following factors‚ The project's whole life costs are recorded as £101m as agreed in the two OBCs for the project.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ The baseline benefits will be determined during the next phase of design development when further detail is available to calculate the benefits.","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. The project agrees with the Delivery Confidence Assessment rating at AMBER. Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 01/12/2031. This is primarily due to the following…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 01/12/2031. This is primarily due to the following factors‚ The project is being delivered in phases and our current programme indicates that the end-date for the last phase remains 01/12/2031.","narrativeClaimKind":null},{"id":"FCO_0216_2223-Q4","year":2026,"name":"TOKYO NEW BUILD, REMODELLING AND REFURBISHMENT","department":"FCDO","category":"Infrastructure and Construction","description":"Refurbishment and remodelling of key buildings on the British Embassy Tokyo compound. The project will address end of life and failing assets through repair and replacement, it will prevent further deterioration and increasing danger of structural damage to the historic buildings and it will provide fit for purpose facilities. The existing buildings fail to fully meet health and safety requirements and are not suitable for a modern and sustainable 21st century office working environment. This significant investment will future proof our ability to deliver diplomatic and operational solutions in one of our most important global posts.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at AMBER.","startDate":"2022-06-01","endDate":null,"scheduleNarrative":"Compared to financial year 24/25 Q4, the projects end date at 25/26 Q4 remains at 1/12/2031. This is primarily due to the following factors: the successful awarding of the Phase 1 contract in January 26 to a leading Tier 1 Japanese contractor, the strategic decision to prioritise Phase 2 ahead of Phase 3 - ensuring resources are directed towards the most critical elements of the project - and the valuable insights gained from Phase 1, which are being leveraged to improve delivery of the subsequent phases. These elements collectively contribute to maintaining the established timeline and reinforcing the project's overall stability.","fyBaseline":3.13,"fyForecast":1.58,"fyVariance":49.57,"varianceNarrative":"The budget variance exceeds 5%. This is due to: the contractors requesting an extension of the tender period so that they could familiarise themselves with UK specific requirements (both contract terms and building standards); and the approval of the Full Business Case taking longer than had been allowed for in the project programme. This led to a delay in contract award and hence a reduction in spend in 2025/26. The contract was awarded in January 2026.","wholeLifeCost":111.25,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) increased from 101 to 120. This is primarily due to the following factors: inclusion of additional scope to deliver additional benefits, as well as further refinement in the design. The revised baseline was agreed by both FCDO and HMT in late 2026, ensuring alignment with updated project requirements and financial parameters.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors: the project is still in the early stages of development - we would expect to be able to calculate monetised benefits at the end of the RIBA Stage 4 design (Autumn 2026). Assuming proper maintenance admin savings are expected through reduced spend on utilities and maintenance.","themes":["Cost & funding","Commercial & supply chain","Approvals & decisions","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at AMBER. Compared to financial year 24/25 Q4, the projects end date at 25/26 Q4 remains at 1/12/2031. This is primarily due to the following factors: the successful awarding of the Phase 1 contract in January 26 to a leading Tier 1 Japanese…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25 Q4, the projects end date at 25/26 Q4 remains at 1/12/2031. This is primarily due to the following factors: the successful awarding of the Phase 1 contract in January 26 to a leading Tier 1 Japanese contractor, the strategic decision to prioritise Phase 2 ahead of Phase 3 - ensuring resources are directed towards the most critical elements of the project - and the valuable insights gained from Phase 1, which are being leveraged to improve delivery of the subsequent phases. These elements collectively contribute to maintaining the established timeline and reinforcing the project's overall stability.","narrativeClaimKind":null}],"previous":{"id":"FCO_0216_2223-Q4","year":2025,"name":"TOKYO NEW BUILD, REMODELLING AND REFURBISHMENT","department":"FCDO","category":"Infrastructure and Construction","description":"Refurbishment and remodelling of key buildings on the British Embassy Tokyo compound. The project will address end of life and failing assets through repair and replacement, it will prevent further deterioration and increasing danger of structural damage to the historic buildings and it will provide fit for purpose facilities. The existing buildings fail to fully meet health and safety requirements and are not suitable for a modern and sustainable 21st century office working environment. This significant investment will future proof our ability to deliver diplomatic and operational solutions in one of our most important global posts.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. The project agrees with the Delivery Confidence Assessment rating at AMBER.","startDate":"2022-06-01","endDate":"2031-12-01","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 01/12/2031. This is primarily due to the following factors‚ The project is being delivered in phases and our current programme indicates that the end-date for the last phase remains 01/12/2031.","fyBaseline":4.0,"fyForecast":4.0,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%. The budget variance is less than or equal to 5%.","wholeLifeCost":101.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 100 to 101. This is primarily due to the following factors‚ The project's whole life costs are recorded as £101m as agreed in the two OBCs for the project.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ The baseline benefits will be determined during the next phase of design development when further detail is available to calculate the benefits.","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. The project agrees with the Delivery Confidence Assessment rating at AMBER. Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 01/12/2031. This is primarily due to the following…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 01/12/2031. This is primarily due to the following factors‚ The project is being delivered in phases and our current programme indicates that the end-date for the last phase remains 01/12/2031.","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":null,"attentionScore":33,"attentionReasons":["Current published delivery confidence is Amber","In-year forecast variance is +49.6%"]},{"id":"MOD_0076_1213-Q1","year":2026,"name":"ASTUTE BOATS 1-7","department":"MOD","category":"Military Capability","description":"To deliver the seven Boat Astute Class within approved performance, cost and time parameters, while actively contributing to the sustainment of the UK submarine design and manufacturing capability.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25-Q4, the NISTA/SRO Delivery Confidence Assessment rating at 25/26-Q4 remained at Amber. This is primarily due to the following factors. 1. The Astute build programme has achieved the majority of its build and commissioning milestones in this financial year. However, the Delivery Confidence Assessment remains Amber because of potential delays in the in-water phase for Boat 6, and the build of Boat 7 based on current productivity rates.","startDate":"1997-03-17","endDate":null,"scheduleNarrative":"Exempt under Section 26 - Defence","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":14428.06,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) increased from £11,570.00 to £11,590.00. This is primarily due to a revised cost estimate for completion of the programme and inflation.","benefits":null,"benefitsNarrative":"Compared to financial year 2024/25-Q4, the project's departmental-agreed monetised benefits at 2025/26-Q4 remained at £0m.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25-Q4, the NISTA/SRO Delivery Confidence Assessment rating at 25/26-Q4 remained at Amber. This is primarily due to the following factors. 1. The Astute build programme has achieved the majority of its build and commissioning milestones in this financial year. However, the Delivery Confidence Assessment remains Amber because of…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 26 - Defence","narrativeClaimKind":null,"history":[{"id":"MOD_0076_1213-Q1","year":2020,"name":"Astute Boats 1-7","department":"MOD","category":"Military Capability","description":"The design, development and manufacture of Astute class submarines.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber/Red, which has declined since last year�s Q2 1819 Amber, due primarily to the following factors; - A delay to Boat 4 which was caused by emergent technical issues which required unplanned repair and rework before proceeding with the normal commissioning process. - Elements of work on Boat 5 were paused in order to deploy extra resource to resolving the issues on Boat 4, impacting on the delivery. Through additional recruitment and provision of training to upskill the current workforce, we will significantly improve the situation in the medium term. Since the Q2 1920 (30th September 2019) Amber/Red IPA DCA, the following primary project actions have impacted the original Q2 IPA DCA; - The MOD has worked with its Tier 1 industrial partners to deliver Boat 4 to the Royal Navy and to recover the Boat 5 schedule, as well as improve production quality. Normal boat commissioning operations are now progressing.","startDate":null,"endDate":null,"scheduleNarrative":"Exempt under Section 24 of Freedom of Information Act 2000 (National Security)","fyBaseline":467.43,"fyForecast":424.11,"fyVariance":-9.0,"varianceNarrative":"The 19/20 in-year baseline / forecast variance at Q2 1920 (30th September 2019) of -9%, is due primarily to the following factors; - Greater clarity of expenditure across the Boat Build Programme. Since the Q2 1920 (30th September 2019) 19/20 in-year baseline / forecast variance of -9%, the following primary project actions have impacted the original Q2 19/20 in-year variance; - Boat 4 has been successfully delivered from Barrow. - Through continued close engagement and collaboration with industry further schedule improvement has been made.","wholeLifeCost":10769.42,"costNarrative":"The baseline Whole Life Cost at Q2 1920 (30th September 2019) is �10,769.42 m, has increased by �798.65 m since last year's Q2 1819 (�m) baseline Whole Life Cost of �9,970.77 m, due primarily to the following factors; - The department re-baselined the ASTUTE programme for the long term, with its associated whole life costs, as our understanding of the overall schedule and costs matured. Approval changes across the whole programme including boats, schedules, rates, and performance expectation. None of which are not attributable to a discrete boat or cause","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Workforce & capability","Approvals & decisions"],"evidenceExcerpt":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber/Red, which has declined since last year�s Q2 1819 Amber, due primarily to the following factors; - A delay to Boat 4 which was caused by emergent technical issues which required unplanned repair and rework before proceeding with the normal commissioning process. -…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2020","sourceLabel":"IPA Annual Report 2019-20","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 24 of Freedom of Information Act 2000 (National Security)","narrativeClaimKind":null},{"id":"MOD_0076_1213-Q1","year":2021,"name":"Astute Boats 1-7","department":"MOD","category":"Military Capability","description":"To deliver the seven Boat Astute Class within approved performance, cost and time parameters, while actively contributing to the sustainment of the UK submarine design and manufacturing capability.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber/red. This is primarily due to the following factors: The Astute programme had previously reported schedule delays to Boat 4 and Boat 5, given emergent technical issues on Boat 4, which having been resolved allowed Boat 4 to sail from Barrow in April 2020. Having seen programme delivery confidence grow in the first quarter of 2020, COVID-19 added risk to the Astute programme, however through commitment to the use of Personal Protective Equipment, working ways and personnel safety, any impacts to the remaining schedules are thought to be minimal. Reprioritisation of tasks in the early stages of the pandemic, plus changing shift patterns and a rigorous testing regime, safeguarded the individual projects. The most recent Infrastructure and Projects Authority review has concluded that delivery confidence has improved overall.","startDate":"1997-03-17","endDate":null,"scheduleNarrative":"Exempt under Section 24 of the Freedom of Information Act 2000 (National security)","fyBaseline":434.91,"fyForecast":451.47,"fyVariance":4.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":10830.05,"costNarrative":"Compared to financial year 19/20-Q2, the projects Baseline Whole Life Cost increased from �10769.42m to �10830.05m. This is primarily due to the following factors: The last Reported Whole Life Cost through the Defence Major Programmes Portfolio at Q2 2019/20 was �10,769.423m. There have been increases mainly driven by inclusion of Covid-19 schedule�impact assessments across the remaining Boats offset by declaration�of cost reductions through BAE Systems Project 2021 efficiency programme.�","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Technical & integration","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber/red. This is primarily due to the following factors: The Astute programme had previously reported schedule delays to Boat 4 and Boat 5, given emergent technical issues on Boat 4, which having been resolved allowed Boat 4 to…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 24 of the Freedom of Information Act 2000 (National security)","narrativeClaimKind":null},{"id":"MOD_0076_1213-Q1","year":2022,"name":"Astute Boats 1-7","department":"MOD","category":"Military Capability","description":"To deliver the seven Boat Astute Class within approved performance, cost and time parameters, while actively contributing to the sustainment of the UK submarine design and manufacturing capability.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating increased from Amber/Red to Amber. This is primarily due to the following factors: The removal of the incremental Amber/Red and Amber/Green rating. Despite continued COVID-19 challenges, the Astute build programme has achieved its major build and commissioning milestones though this financial year, and therefore delivery confidence of Amber is maintained. HMS AUDACIOUS commissioned, HMS ANSON is afloat, HMS AGEMEMNON and HMS AGINCOURT are being fitted out. However, the programme still carries schedule risk because of workload demands and access to the limited number of Suitably Qualified and Experienced Personnel that is not limited to Defence but also Industry and the wider Nuclear Sector.","startDate":"1997-03-17","endDate":null,"scheduleNarrative":"Exempt under Section 24 of the Freedom of Information Act 2000 (National security)","fyBaseline":371.56,"fyForecast":386.07,"fyVariance":4.0,"varianceNarrative":"The budget variance is inferior or equal to 5%","wholeLifeCost":10833.0,"costNarrative":"Compared to 2021-Q4 the project's Baseline Whole Life Cost increased from 10830.05 (£m) to 10832.67 (£m) . This is primarily due to the following factors: Impacts on the submarine build schedules including those caused by Covid-19.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating increased from Amber/Red to Amber. This is primarily due to the following factors: The removal of the incremental Amber/Red and Amber/Green rating. Despite continued COVID-19 challenges, the Astute build programme has achieved its major build…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 24 of the Freedom of Information Act 2000 (National security)","narrativeClaimKind":null},{"id":"MOD_0076_1213-Q1","year":2023,"name":"Astute Boats 1-7","department":"MOD","category":"Military Capability","description":"To deliver the seven Boat Astute Class within approved performance, cost and time parameters, while actively contributing to the sustainment of the UK submarine design and manufacturing capability.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber (SRO rating). This is primarily due to the following factors. The Astute build programme has achieved its major build and commissioning milestones through this financial year, however, the programme still carries significant schedule risk for the remaining boats because of workload demands and the limited number of Suitably Qualified and Experienced Personnel available.","startDate":"1997-03-17","endDate":null,"scheduleNarrative":"Exempt under Section 24 of the Freedom of Information Act 2000 (National security)","fyBaseline":304.89,"fyForecast":384.48,"fyVariance":26.0,"varianceNarrative":"The budget variance exceeds 5%. . This is primarily due to the following factors: Inflationary impact realised from increased supplier pay settlements and rates. The committment to new contracts with the prime supplier, including the contracts to install essential safety and capability change packages to the remaining boats.","wholeLifeCost":10827.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 decreased from 10833m. to 10827m. This is primarily due to the following factors. The programme remains on track to complete within budget.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This programme does not report cashable benefits. Its aim is to provision the armed forces with the equipment and / or infrastructure required.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber (SRO rating). This is primarily due to the following factors. The Astute build programme has achieved its major build and commissioning milestones through this financial year, however, the programme still carries significant schedule risk for the…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 24 of the Freedom of Information Act 2000 (National security)","narrativeClaimKind":null},{"id":"MOD_0076_1213-Q1","year":2024,"name":"Astute Boats 1-7","department":"MOD","category":"Military Capability","description":"To deliver the seven Boat Astute Class within approved performance, cost and time parameters, while actively contributing to the sustainment of the UK submarine design and manufacturing capability.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure and Projects Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The Astute build programme has achieved the majority of its build and commissioning milestones in this financial year. However, the programme remains Amber because of potential delays based on current productivity rates, and the possibility of delay during the in-water phase for Boat 6.","startDate":"1997-03-17","endDate":null,"scheduleNarrative":"The programme remains committed to building seven Astute Class submarines. Boats one to five have been delivered to the Royal Navy while the remaining two vessels are at an advanced stage of build at the BAES Shipyard.","fyBaseline":389.52,"fyForecast":411.52,"fyVariance":5.648,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. Increased supplier pay settlement and rates.","wholeLifeCost":11256.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 increased from 10827m. to 11256m. This is primarily due to the following factors. A revised cost estimate for completion of the programme, factoring in inflation and delivery cadence within the Shipyard.","benefits":0.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 0m.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure and Projects Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The Astute build programme has achieved the majority of its build and commissioning milestones in this financial year. However, the programme remains Amber…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The programme remains committed to building seven Astute Class submarines. Boats one to five have been delivered to the Royal Navy while the remaining two vessels are at an advanced stage of build at the BAES Shipyard.","narrativeClaimKind":null},{"id":"MOD_0076_1213-Q1","year":2025,"name":"ASTUTE BOATS 1-7","department":"MoD","category":"Military Capability","description":"To deliver the seven Boat Astute Class within approved performance, cost and time parameters, while actively contributing to the sustainment of the UK submarine design and manufacturing capability.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Project's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER, compared with the Infrastructure and Projects Authority's assessment last year of AMBER. This is due to the following factors. The Astute build programme has achieved the majority of its build and commissioning milestones in this financial year. However, the programme remains Amber because of potential delays based on current productivity rates, and the possibility of delay during the in-water phase for Boat 6.","startDate":"1997-03-17","endDate":null,"scheduleNarrative":"Section 24 - National security","fyBaseline":353.05,"fyForecast":329.7,"fyVariance":6.61,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. Increased supplier pay settlement and rates.","wholeLifeCost":11571.12,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 11256 to 11571. This is primarily due to the following factors. A revised cost estimate for completion of the programme, factoring in inflation and delivery cadence within the Shipyard.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain"],"evidenceExcerpt":"The Project's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER, compared with the Infrastructure and Projects Authority's assessment last year of AMBER. This is due to the following factors. The Astute build programme has achieved the majority of its build and commissioning milestones in this financial year. However, the programme remains Amber…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Section 24 - National security","narrativeClaimKind":null},{"id":"MOD_0076_1213-Q1","year":2026,"name":"ASTUTE BOATS 1-7","department":"MOD","category":"Military Capability","description":"To deliver the seven Boat Astute Class within approved performance, cost and time parameters, while actively contributing to the sustainment of the UK submarine design and manufacturing capability.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25-Q4, the NISTA/SRO Delivery Confidence Assessment rating at 25/26-Q4 remained at Amber. This is primarily due to the following factors. 1. The Astute build programme has achieved the majority of its build and commissioning milestones in this financial year. However, the Delivery Confidence Assessment remains Amber because of potential delays in the in-water phase for Boat 6, and the build of Boat 7 based on current productivity rates.","startDate":"1997-03-17","endDate":null,"scheduleNarrative":"Exempt under Section 26 - Defence","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":14428.06,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) increased from £11,570.00 to £11,590.00. This is primarily due to a revised cost estimate for completion of the programme and inflation.","benefits":null,"benefitsNarrative":"Compared to financial year 2024/25-Q4, the project's departmental-agreed monetised benefits at 2025/26-Q4 remained at £0m.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25-Q4, the NISTA/SRO Delivery Confidence Assessment rating at 25/26-Q4 remained at Amber. This is primarily due to the following factors. 1. The Astute build programme has achieved the majority of its build and commissioning milestones in this financial year. However, the Delivery Confidence Assessment remains Amber because of…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 26 - Defence","narrativeClaimKind":null}],"previous":{"id":"MOD_0076_1213-Q1","year":2025,"name":"ASTUTE BOATS 1-7","department":"MoD","category":"Military Capability","description":"To deliver the seven Boat Astute Class within approved performance, cost and time parameters, while actively contributing to the sustainment of the UK submarine design and manufacturing capability.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Project's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER, compared with the Infrastructure and Projects Authority's assessment last year of AMBER. This is due to the following factors. The Astute build programme has achieved the majority of its build and commissioning milestones in this financial year. However, the programme remains Amber because of potential delays based on current productivity rates, and the possibility of delay during the in-water phase for Boat 6.","startDate":"1997-03-17","endDate":null,"scheduleNarrative":"Section 24 - National security","fyBaseline":353.05,"fyForecast":329.7,"fyVariance":6.61,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. Increased supplier pay settlement and rates.","wholeLifeCost":11571.12,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 11256 to 11571. This is primarily due to the following factors. A revised cost estimate for completion of the programme, factoring in inflation and delivery cadence within the Shipyard.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain"],"evidenceExcerpt":"The Project's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER, compared with the Infrastructure and Projects Authority's assessment last year of AMBER. This is due to the following factors. The Astute build programme has achieved the majority of its build and commissioning milestones in this financial year. However, the programme remains Amber…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Section 24 - National security","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":null,"attentionScore":32,"attentionReasons":["Current published delivery confidence is Amber","In-year forecast variance is +43.0%"]},{"id":"CO_0176_2223-Q3","year":2026,"name":"Falcon Programme","department":"CO","category":"Government Transformation and Service Delivery","description":"The Falcon programme is an important initiative to update the Cabinet Office's main IT systems. We are moving our staff from Google Workspace to Microsoft 365 (M365). The initial approach was for the Cabinet Office to build its own new IT system for this change. However, after review, we found this was not the most cost-effective option. We have now approved a new plan. This involves moving our digital services to a shared government service called Integrated Corporate Services (ICS), which is managed by the Department for Energy Security and Net Zero (DESNZ). While this new approach means the project will take a bit longer to complete, it will save money in the long run by using an existing government service. Why is this change important? The Cabinet Office is the central headquarters for the government. Currently, we use Google Workspace, which is different from the Microsoft systems used by most of our partners both inside and outside of government. This difference can make working together and sharing information difficult. Moving to Microsoft 365 will help us work more effectively and efficiently. It's becoming more and more important for us to collaborate easily with people from other organisations, who might be in different places, using different devices, and working at different times. This change will also allow us to use new Artificial Intelligence (AI) tools that are being developed across government. What will the Falcon programme deliver? The programme has two main goals: A new IT system for the Cabinet Office: This will include a new Microsoft 365 setup, built and managed by Integrated Corporate Services. Moving our staff and their data: We will carefully move our employees and their information from Google Workspace to Microsoft 365. This will bring us in line with the rest of government and open up better ways to work together.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 improved to AMBER. This is primarily due to the following factors: - Refined Cyber Assurance and incident response mechanisms - Finalised the data migration strategy - Obtained approval for resourcing and budgets - Delivered platform go live, and pre-pilot user testing. The following area's are area's of focus to move the programme from Amber to Green: - Defining the future operating model & support processes - Improving the programme's and its partners current responsiveness to change","startDate":"2022-05-01","endDate":"2026-12-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 has increased from Dec 2026 to Dec 2027. This is primarily due to the following factors: The platform testing in the prepilot, along with subsequent lessons learned, involved replanning. This replanning now includes additional time for the migration to the ICS Shared Services operating model and Data migration. Migrations are by Business Unit, in tranches selected by size and complexity through to December 2027 - Close","fyBaseline":8.43,"fyForecast":4.94,"fyVariance":41.38,"varianceNarrative":"The budget variance exceeds 5%. The budget for the year is lower than anticipated budget. This is primarily due to investing resource time in delivery mobilisation planning during the financial year and a revision of the rollout plan. A successful pre pilot has commenced in the financial year leading to a revised pilot date early in FY26/27 which will enable migration at pace during FY 26/27. The whole lifecycle cost of the programme remains unchanged.","wholeLifeCost":23.11,"costNarrative":"Compared to financial year 24/25 Q4, the programme's departmentally agreed whole life cycle cost at 25/26 Q4 increased. This is primarily due to a revised business case submission for Microsoft Licencing and Copilot commitment. The programme scope now includes the inclusion of Copilot and resulted in certainty over the M365 E5 cost uplifts, This resulted in a marginal increase on the baseline cost.","benefits":88.1,"benefitsNarrative":"Q4 decreased. This is primarily due to a change in Cabinet Office user numbers reducing benefits and a revision to the migration rollout plan meaning benefits associated with previous financial years were not realised. A revised programme business case submission in the summer will rebaseline the benefit position over a 5 year period.","themes":["Cost & funding","Technical & integration","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 improved to AMBER. This is primarily due to the following factors: - Refined Cyber Assurance and incident response mechanisms - Finalised the data migration strategy - Obtained approval for resourcing and budgets - Delivered platform go live, and…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 has increased from Dec 2026 to Dec 2027. This is primarily due to the following factors: The platform testing in the prepilot, along with subsequent lessons learned, involved replanning. This replanning now includes additional time for the migration to the ICS Shared Services operating model and Data migration. Migrations are by Business Unit, in tranches selected by size and complexity through to December 2027 - Close","narrativeClaimKind":null,"history":[{"id":"CO_0176_2223-Q3","year":2023,"name":"Falcon IT Platform Refresh and Migration","department":"CO","category":"Government Transformation and Service Delivery","description":"Falcon is a business change programme that will fundamentally underpin the digital transformation of the Cabinet Office.The Transformation will be achieved through two key areas of investment. First we will update the OFFICIAL IT platforms within the Cabinet Office, which will contribute to reducing cyber-security risk, address legacy systems and automate underlying infrastructure. The second work stream the Cabinet Office we will invest in, will enable the implementation of the Central Digital Data Office (CDDO) interoperability policy standards and guidance through the migration of the department to Microsoft Office M365. This will enable better interoperability across government as we move both our people and data from Google Workspace to Microsoft 365. The Cabinet Office is at the heart of Government and a common productivity suite will enable more efficient and effective ways of working.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 is Amber. This is primarily due to the following factors. The DCA of Amber reflects the position of the Falcon Programme in February 2023. The programme has continued to build capacity and capability to ensure it moves forward, it has successfully on-boarded partners and commenced the Discovery phase. Delivery is closely managed by the a Programme Board attended by our Partners to ensure a balance in pace of delivery and quality and ensuring Value for Money. The Programme supports further independent assurance reviews and this are planned alongside the production of a Full Business Case that will be submitted for approval by the Cabinet Office and by HM Treasury for funding to build the new platform and migrate users and their data to Microsoft M365.","startDate":"2022-05-01","endDate":"2025-03-31","scheduleNarrative":"The project's end-date at 22/23-Q4 is 2025-03-31. This is primarily due to the following factors. The programme will complete discovery activity in autumn 2023. This will deliver a plan with a high level of confidence for the build of the new platform and the migration to M365. The schedule has a target date of 31st March 2025 with a contingency of one year that will be informed by discovery. The schedule will be monitored by the programme board to ensure value for for money and will will accelerate activity where appropriate.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"The programme was challenged to move at pace but was unable to complete the complex procurement activity in the financial year due to extensions in timelines, which were at the request of the market. One of the preferred commercial frameworks was closed (G-CLOUD12), forcing the programme to move to G-CLOUD13 and restart that procurement. These factors were the key drivers behind the budget variance which also impacted the programmes ability to onboard staff resource. Commercial contracts for the 2 supporting partners were signed in Q4 23/24.","wholeLifeCost":52.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 22/23-Q4 is 52m. This is primarily due to the following factors. The Falcon programme has an approved outline business case with forecast costs. The programmes approvals allow it to move into discovery where the phase report will confirm second stage costs. With this data a full business case with final costs will be submitted. The whole life costs will be confirmed at this point.","benefits":60.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 60m. The programme will deliver cashable and non- cashable benefits delivering improved collaboration and efficiency in line with the CDDO interoperability policy from the migration of the Department from Google to MS365. The OFFICAL platform refresh will deliver enhanced cybersecurity benefits including mitigating the potential costs of addressing a serious cyber security attack.","themes":["Delivery & schedule","Cost & funding","Commercial & supply chain","Approvals & decisions"],"evidenceExcerpt":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 is Amber. This is primarily due to the following factors. The DCA of Amber reflects the position of the Falcon Programme in February 2023. The programme has continued to build capacity and capability to ensure it moves forward, it has successfully on-boarded partners and…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 22/23-Q4 is 2025-03-31. This is primarily due to the following factors. The programme will complete discovery activity in autumn 2023. This will deliver a plan with a high level of confidence for the build of the new platform and the migration to M365. The schedule has a target date of 31st March 2025 with a contingency of one year that will be informed by discovery. The schedule will be monitored by the programme board to ensure value for for money and will will accelerate activity where appropriate.","narrativeClaimKind":null},{"id":"CO_0176_2223-Q3","year":2024,"name":"Falcon IT Platform Refresh and Migration","department":"CO","category":"Government Transformation and Service Delivery","description":"Falcon is a business change programme that will fundamentally underpin the digital transformation of the Cabinet Office.The Transformation will be achieved through two key areas of investment. First we will update the OFFICIAL IT platforms within the Cabinet Office, which will contribute to reducing cyber-security risk, address legacy systems and automate underlying infrastructure. The second work stream the Cabinet Office we will invest in, will enable the implementation of the Central Digital Data Office (CDDO) interoperability policy standards and guidance through the migration of the department to Microsoft Office M365. This will enable better interoperability across government as we move both our people and data from Google Workspace to Microsoft 365. The Cabinet Office is at the heart of Government and a common productivity suite will enable more efficient and effective ways of working.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 22/23-Q4, Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 increased from Amber to Red. This is primarily due to the following factors. The programme is currently rated at Red as it does not have an agreed strategic direction, investment and funding available. If there continues to be misalignment between the strategic intent and funding availability then the programme will almost certainly fail to deliver the scope and benefits set out in the business case. _x000D_ _x000D_ The programme's route to Green is through the submission of a Programme Business Case (PBC) with defined options for the migration and technical delivery.","startDate":"2022-05-01","endDate":"2026-03-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 increased from 2025-03-31 to 2026-03-31. This is primarily due to the following factors. The original profiling was delayed by 12 months due to procurement delays. The original profile was a 3 year spend profile from Apr 23 to March 26. The anticipated spend profile expects an end date of April 27, 12 months after the original baseline end date.","fyBaseline":21.75,"fyForecast":10.05,"fyVariance":-54.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The original profiling 21.8 m was delayed by 12 months due to procurement delays. This has had the impact of moving the original spend profile out by 12 months. The 23/24 financial year was intended to be a more expensive migration and roll out period in the original baseline plan, however due to procurement delays the discovery period and proof of concept have been completed in 23/24 and design phase has commenced. The overall costs are therefore significantly lower (11.7 m) reducing the profile to 10 m in 23/24 against the baseline plan as migration and roll out has not yet commenced.","wholeLifeCost":51.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 decreased from 52m. to 51m. This is primarily due to the following factors. The Whole Life Cost 51.4 m remains within the GMPP approval. There is a slight reduction in WLC 50.6 m due to in year savings in 23/24 against budget profile. The profiling over future years will be reviewed as part of the May Programme Business Case Submission. Profiles have used business planning options for the remaining years whilst the business case preparation is ongoing.","benefits":60.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 60m. Benefits were re-baselined in March 2023. The benefits value remains consistent with the baseline. Benefits review is ongoing as part of the May Programme Business Case Submission.","themes":["Cost & funding","Approvals & decisions","Technical & integration","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 increased from Amber to Red. This is primarily due to the following factors. The programme is currently rated at Red as it does not have an agreed strategic direction, investment and funding available. If there continues to be misalignment…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 increased from 2025-03-31 to 2026-03-31. This is primarily due to the following factors. The original profiling was delayed by 12 months due to procurement delays. The original profile was a 3 year spend profile from Apr 23 to March 26. The anticipated spend profile expects an end date of April 27, 12 months after the original baseline end date.","narrativeClaimKind":null},{"id":"CO_0176_2223-Q3","year":2025,"name":"Falcon Programme","department":"CO","category":"Government Transformation and Service Delivery","description":"The Falcon programme is an important initiative to update the Cabinet Office's main IT systems. We are moving our staff from Google Workspace to Microsoft 365 (M365). The initial approach was for the Cabinet Office to build its own new IT system for this change. However, after review, we found this was not the most cost-effective option. We have now approved a new plan. This involves moving our digital services to a shared government service called Integrated Corporate Services (ICS), which is managed by the Department for Energy Security and Net Zero (DESNZ). While this new approach means the project will take a bit longer to complete, it will save money in the long run by using an existing government service. Why is this change important? The Cabinet Office is the central headquarters for the government. Currently, we use Google Workspace, which is different from the Microsoft systems used by most of our partners both inside and outside of government. This difference can make working together and sharing information difficult. Moving to Microsoft 365 will help us work more effectively and efficiently. It's becoming more and more important for us to collaborate easily with people from other organisations, who might be in different places, using different devices, and working at different times. This change will also allow us to use new Artificial Intelligence (AI) tools that are being developed across government. What will the Falcon programme deliver? The programme has two main goals: A new IT system for the Cabinet Office: This will include a new Microsoft 365 setup, built and managed by Integrated Corporate Services. Moving our staff and their data: We will carefully move our employees and their information from Google Workspace to Microsoft 365. This will bring us in line with the rest of government and open up better ways to work together.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at RED. This is primarily due to the following factors‚ The Infrastructure Project Authority's Delivery Confidence Assessment rating for 24/25-Q4 remains at RED. This is primarily due to concerns that the Programme does not have the resources to transition the Cabinet Office Business Units (BUs) to the new services within the planned time frame. The delay in the Pilot, now projected for completion by September 2025, has contributed to this assessment. An IPA Gateway took place where the Review Team expressed concerns about the pace of BU migrations and the rising costs associated with the Programme. The issues are being addressed as part of an action plan with NISTA support.","startDate":"2022-05-01","endDate":null,"scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2026. This is primarily due to the following factors‚ The programmes end date is now forecast to be complete by 31 December 2026. The initial approach was for the Cabinet Office to build its own new IT system for this change. However, after review, we found this was not the most cost-effective option. We have now approved a new plan with an extended delivery window. This involves moving our digital services to a shared government service called Integrated Corporate Services (ICS), which is managed by the Department for Energy Security and Net Zero (DESNZ).","fyBaseline":7.2,"fyForecast":6.78,"fyVariance":5.83,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ This is due to reduced spend against the baseline due to resourcing delays.","wholeLifeCost":23.7,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 51 to 23. This is primarily due to the following factors‚ This is due to a revised business case submission which changed from building our own platform, to outsourcing to another government department and securing migration resource from Microsoft and partners at no investment cost.","benefits":88.2,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 60 to 88. This is primarily due to the following factors‚ As part of the business case submission we revised the benefit profiling in line with CDDO economist recommendations.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Technical & integration"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at RED. This is primarily due to the following factors‚ The Infrastructure Project Authority's Delivery Confidence Assessment rating for 24/25-Q4 remains at RED. This is primarily due to concerns that the Programme does not…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2026. This is primarily due to the following factors‚ The programmes end date is now forecast to be complete by 31 December 2026. The initial approach was for the Cabinet Office to build its own new IT system for this change. However, after review, we found this was not the most cost-effective option. We have now approved a new plan with an extended delivery window. This involves moving our digital services to a shared government service called Integrated Corporate Services (ICS), which is managed by the Department for Energy Security and Net Zero (DESNZ).","narrativeClaimKind":null},{"id":"CO_0176_2223-Q3","year":2026,"name":"Falcon Programme","department":"CO","category":"Government Transformation and Service Delivery","description":"The Falcon programme is an important initiative to update the Cabinet Office's main IT systems. We are moving our staff from Google Workspace to Microsoft 365 (M365). The initial approach was for the Cabinet Office to build its own new IT system for this change. However, after review, we found this was not the most cost-effective option. We have now approved a new plan. This involves moving our digital services to a shared government service called Integrated Corporate Services (ICS), which is managed by the Department for Energy Security and Net Zero (DESNZ). While this new approach means the project will take a bit longer to complete, it will save money in the long run by using an existing government service. Why is this change important? The Cabinet Office is the central headquarters for the government. Currently, we use Google Workspace, which is different from the Microsoft systems used by most of our partners both inside and outside of government. This difference can make working together and sharing information difficult. Moving to Microsoft 365 will help us work more effectively and efficiently. It's becoming more and more important for us to collaborate easily with people from other organisations, who might be in different places, using different devices, and working at different times. This change will also allow us to use new Artificial Intelligence (AI) tools that are being developed across government. What will the Falcon programme deliver? The programme has two main goals: A new IT system for the Cabinet Office: This will include a new Microsoft 365 setup, built and managed by Integrated Corporate Services. Moving our staff and their data: We will carefully move our employees and their information from Google Workspace to Microsoft 365. This will bring us in line with the rest of government and open up better ways to work together.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 improved to AMBER. This is primarily due to the following factors: - Refined Cyber Assurance and incident response mechanisms - Finalised the data migration strategy - Obtained approval for resourcing and budgets - Delivered platform go live, and pre-pilot user testing. The following area's are area's of focus to move the programme from Amber to Green: - Defining the future operating model & support processes - Improving the programme's and its partners current responsiveness to change","startDate":"2022-05-01","endDate":"2026-12-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 has increased from Dec 2026 to Dec 2027. This is primarily due to the following factors: The platform testing in the prepilot, along with subsequent lessons learned, involved replanning. This replanning now includes additional time for the migration to the ICS Shared Services operating model and Data migration. Migrations are by Business Unit, in tranches selected by size and complexity through to December 2027 - Close","fyBaseline":8.43,"fyForecast":4.94,"fyVariance":41.38,"varianceNarrative":"The budget variance exceeds 5%. The budget for the year is lower than anticipated budget. This is primarily due to investing resource time in delivery mobilisation planning during the financial year and a revision of the rollout plan. A successful pre pilot has commenced in the financial year leading to a revised pilot date early in FY26/27 which will enable migration at pace during FY 26/27. The whole lifecycle cost of the programme remains unchanged.","wholeLifeCost":23.11,"costNarrative":"Compared to financial year 24/25 Q4, the programme's departmentally agreed whole life cycle cost at 25/26 Q4 increased. This is primarily due to a revised business case submission for Microsoft Licencing and Copilot commitment. The programme scope now includes the inclusion of Copilot and resulted in certainty over the M365 E5 cost uplifts, This resulted in a marginal increase on the baseline cost.","benefits":88.1,"benefitsNarrative":"Q4 decreased. This is primarily due to a change in Cabinet Office user numbers reducing benefits and a revision to the migration rollout plan meaning benefits associated with previous financial years were not realised. A revised programme business case submission in the summer will rebaseline the benefit position over a 5 year period.","themes":["Cost & funding","Technical & integration","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 improved to AMBER. This is primarily due to the following factors: - Refined Cyber Assurance and incident response mechanisms - Finalised the data migration strategy - Obtained approval for resourcing and budgets - Delivered platform go live, and…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 has increased from Dec 2026 to Dec 2027. This is primarily due to the following factors: The platform testing in the prepilot, along with subsequent lessons learned, involved replanning. This replanning now includes additional time for the migration to the ICS Shared Services operating model and Data migration. Migrations are by Business Unit, in tranches selected by size and complexity through to December 2027 - Close","narrativeClaimKind":null}],"previous":{"id":"CO_0176_2223-Q3","year":2025,"name":"Falcon Programme","department":"CO","category":"Government Transformation and Service Delivery","description":"The Falcon programme is an important initiative to update the Cabinet Office's main IT systems. We are moving our staff from Google Workspace to Microsoft 365 (M365). The initial approach was for the Cabinet Office to build its own new IT system for this change. However, after review, we found this was not the most cost-effective option. We have now approved a new plan. This involves moving our digital services to a shared government service called Integrated Corporate Services (ICS), which is managed by the Department for Energy Security and Net Zero (DESNZ). While this new approach means the project will take a bit longer to complete, it will save money in the long run by using an existing government service. Why is this change important? The Cabinet Office is the central headquarters for the government. Currently, we use Google Workspace, which is different from the Microsoft systems used by most of our partners both inside and outside of government. This difference can make working together and sharing information difficult. Moving to Microsoft 365 will help us work more effectively and efficiently. It's becoming more and more important for us to collaborate easily with people from other organisations, who might be in different places, using different devices, and working at different times. This change will also allow us to use new Artificial Intelligence (AI) tools that are being developed across government. What will the Falcon programme deliver? The programme has two main goals: A new IT system for the Cabinet Office: This will include a new Microsoft 365 setup, built and managed by Integrated Corporate Services. Moving our staff and their data: We will carefully move our employees and their information from Google Workspace to Microsoft 365. This will bring us in line with the rest of government and open up better ways to work together.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at RED. This is primarily due to the following factors‚ The Infrastructure Project Authority's Delivery Confidence Assessment rating for 24/25-Q4 remains at RED. This is primarily due to concerns that the Programme does not have the resources to transition the Cabinet Office Business Units (BUs) to the new services within the planned time frame. The delay in the Pilot, now projected for completion by September 2025, has contributed to this assessment. An IPA Gateway took place where the Review Team expressed concerns about the pace of BU migrations and the rising costs associated with the Programme. The issues are being addressed as part of an action plan with NISTA support.","startDate":"2022-05-01","endDate":null,"scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2026. This is primarily due to the following factors‚ The programmes end date is now forecast to be complete by 31 December 2026. The initial approach was for the Cabinet Office to build its own new IT system for this change. However, after review, we found this was not the most cost-effective option. We have now approved a new plan with an extended delivery window. This involves moving our digital services to a shared government service called Integrated Corporate Services (ICS), which is managed by the Department for Energy Security and Net Zero (DESNZ).","fyBaseline":7.2,"fyForecast":6.78,"fyVariance":5.83,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ This is due to reduced spend against the baseline due to resourcing delays.","wholeLifeCost":23.7,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 51 to 23. This is primarily due to the following factors‚ This is due to a revised business case submission which changed from building our own platform, to outsourcing to another government department and securing migration resource from Microsoft and partners at no investment cost.","benefits":88.2,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 60 to 88. This is primarily due to the following factors‚ As part of the business case submission we revised the benefit profiling in line with CDDO economist recommendations.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Technical & integration"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at RED. This is primarily due to the following factors‚ The Infrastructure Project Authority's Delivery Confidence Assessment rating for 24/25-Q4 remains at RED. This is primarily due to concerns that the Programme does not…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2026. This is primarily due to the following factors‚ The programmes end date is now forecast to be complete by 31 December 2026. The initial approach was for the Cabinet Office to build its own new IT system for this change. However, after review, we found this was not the most cost-effective option. We have now approved a new plan with an extended delivery window. This involves moving our digital services to a shared government service called Integrated Corporate Services (ICS), which is managed by the Department for Energy Security and Net Zero (DESNZ).","narrativeClaimKind":null},"ratingDelta":-1,"transition":"Improved","endDateDeltaDays":null,"attentionScore":32,"attentionReasons":["Current published delivery confidence is Amber","In-year forecast variance is +41.4%"]},{"id":"HO_0330_2324-Q4","year":2026,"name":"Immigration Removal Centre (IRC) Expansion Programme","department":"HO","category":"Infrastructure and Construction","description":"Immigration Enforcement's Detention Strategy & Programmes (DS&P) have been tasked to deliver an additional 1,000 male occupancy strategic / long-term detention bed spaces (increasing the total immigration removal centre (IRC) estate bed capacity from approximately 2,400 to 3,500). Delivery will be central to supporting the Government’s Plan for Change priorities “Strong Foundations: Secure Borders”, “Safer Streets”, and the Statement on “Restoring Order & Control”, by facilitating the Government’s / HO’s ambitions to increase the removal rates of those here unlawfully over time and strengthen public safety. It will also help address the need to manage the IRC Estate and maintain capacity while wider detention facilities are, where required, being refurbished or improved. The Immigration Removal Centre Expansion Programme is the DS&P vehicle to deliver these 1,000 bed spaces - through the redevelopment, and expansion of two previously decommissioned IRCs Campsfield, and Haslar.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Delivery Confidence: Amber. Campsfield IRC Phase 1 - successfully accepted its first detained individual on 03/12/2025, with Optimal Occupancy achieved on 20/03/26, providing 160 beds in total. Haslar IRC Phase 1 - remains on track to complete construction in late 2026, with first detained individuals being accepted in 2027. Phase 2 - Main contractor contract award has been executed 21/04/2026 (for technical design initially), with RIBA 3 & 4 design activity commencing in 05/2026. Outline Crown Development application for Campsfield Phase 2 was submitted 13/03/26, alongside the Statement of National Importance. The Haslar Crown Development Application Notification of Intent and Ministerial ITN is on track for submission in 05/2026. IRCEP Programme - Following a NISTA Gateway 0 review in February 2025, IRCEP achieved an Amber rating. Since then 100% of NISTA's Gateway 0 recommendations have been formally discharged.","startDate":null,"endDate":"2031-03-14","scheduleNarrative":"Exempt under Section 43 - Commercial interests","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Exempt under Section 43 - Commercial interests","themes":["Commercial & supply chain","Scope & requirements","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Delivery Confidence: Amber. Campsfield IRC Phase 1 - successfully accepted its first detained individual on 03/12/2025, with Optimal Occupancy achieved on 20/03/26, providing 160 beds in total. Haslar IRC Phase 1 - remains on track to complete construction in late 2026, with first detained individuals being accepted in 2027. Phase 2 - Main contractor…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 43 - Commercial interests","narrativeClaimKind":null,"history":[{"id":"HO_0330_2324-Q4","year":2024,"name":"Immigration Removal Centre (IRC) Expansion Programme","department":"HO","category":"Government Transformation and Service Delivery","description":"Immigration Enforcement's Detention Services have been tasked to deliver an additional 1,000 detained bed spaces to support increases in detention to deliver government priorities, including Illegal Migration Act removals, increasing demand on the estate due to pressures from the prison estate, increasing 'Business as Usual' removals as activity returns to pre-pandemic levels, and to manage the estate/maintain capacity while wider estate facilities are refurbished. IRCEP is the DS vehicle to deliver these 1,000 bed spaces - through the renovation, and expansion of two previously decommissioned IRCs - Campsfield, and Haslar.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. The programme delivery timeline has zero contingency. Construction has commenced with main contractor for phase 1 at Haslar and Campsfield. Phase 2 construction technical design has commenced. Haslar construction delay risk due to unresolved Habitat risk assessment mitigation. Commercial procurement underway for service provider contracts. FBC approval is underway, Campsfield phase 1 construction has been approved at InvestCo. 5 further FBCs will follow to be approved.","startDate":"2022-01-24","endDate":"2026-12-31","scheduleNarrative":"The project's end-date at 23/24-Q4 is 2026-12-31. This is primarily due to the following factors. OBC has been approved. _x000D_ Campsfield and Haslar construction commenced. _x000D_ Galliford Try has been appointment as main contractor for phase 1 construction. _x000D_ Service provider contracts commenced at evaluation bidder stage._x000D_ NHSE contract at approval bid stage. _x000D_ Campsfield Phase 1 construction (160 beds) FBC approved at InvestCo. _x000D_ Haslar Phase 1 construction (130 beds) FBC approval underway.","fyBaseline":35.16,"fyForecast":35.16,"fyVariance":0.0,"varianceNarrative":"The budget variance is inferior or equal to 5%.","wholeLifeCost":1051.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 23/24-Q4 is 1051m. This is primarily due to the following factors. The WLC includes the costs to build IRC facilities at two sites; Campsfield and Haslar. Programme costs and operator service costs are also accounted for. 95m of the WLC has been approved by the Home Office Investment Committee, but is pending HM Treasury and Cabinet Office approval. The rest of the WLC is not final and is subject to completion of procurement processes and subsequent investment approvals.","benefits":0.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 0m. IRCEP should be considered within the context of enabling delivery of the wider IMA benefits and IE's long term detention capacity requirements. Benefits and economic advantage are realised at IMA portfolio level to avoid IRCEP benefit double counting. This means that there are no quantifiable / monetisable benefits at programme level. _x000D_ _x000D_ The preferred option (to deliver the full 1,000 beds at Campsfield and Haslar), is considered most likely to achieve VfM, because it delivers both the benefits of supporting requirements under the IMA and a permanent long-term solution for Immigration Enforcement detention and enforcement capabilities. Wider benefits associated with IMA are included within the New Plan for Immigration (NPI) business case suite, because it is not currently possible to monetise these benefits without considering the numerous enablers involved with delivering returns (escorting, Immigration Compliance Enforcement (ICE) etc).","themes":["Approvals & decisions","Commercial & supply chain","Delivery & schedule","Cost & funding"],"evidenceExcerpt":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. The programme delivery timeline has zero contingency. Construction has commenced with main contractor for phase 1 at Haslar and Campsfield. Phase 2 construction technical design has commenced. Haslar construction delay…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 23/24-Q4 is 2026-12-31. This is primarily due to the following factors. OBC has been approved. _x000D_ Campsfield and Haslar construction commenced. _x000D_ Galliford Try has been appointment as main contractor for phase 1 construction. _x000D_ Service provider contracts commenced at evaluation bidder stage._x000D_ NHSE contract at approval bid stage. _x000D_ Campsfield Phase 1 construction (160 beds) FBC approved at InvestCo. _x000D_ Haslar Phase 1 construction (130 beds) FBC approval underway.","narrativeClaimKind":null},{"id":"HO_0330_2324-Q4","year":2025,"name":"Immigration Removal Centre (IRC) Expansion Programme","department":"HO","category":"Infrastructure and Construction","description":"Section 43 - Commercial interests","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Section 43 - Commercial interests","startDate":null,"endDate":null,"scheduleNarrative":"Section 43 - Commercial interests","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 43 - Commercial interests","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Section 43 - Commercial interests","themes":["Commercial & supply chain"],"evidenceExcerpt":"Section 43 - Commercial interests Section 43 - Commercial interests","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Section 43 - Commercial interests","narrativeClaimKind":null},{"id":"HO_0330_2324-Q4","year":2026,"name":"Immigration Removal Centre (IRC) Expansion Programme","department":"HO","category":"Infrastructure and Construction","description":"Immigration Enforcement's Detention Strategy & Programmes (DS&P) have been tasked to deliver an additional 1,000 male occupancy strategic / long-term detention bed spaces (increasing the total immigration removal centre (IRC) estate bed capacity from approximately 2,400 to 3,500). Delivery will be central to supporting the Government’s Plan for Change priorities “Strong Foundations: Secure Borders”, “Safer Streets”, and the Statement on “Restoring Order & Control”, by facilitating the Government’s / HO’s ambitions to increase the removal rates of those here unlawfully over time and strengthen public safety. It will also help address the need to manage the IRC Estate and maintain capacity while wider detention facilities are, where required, being refurbished or improved. The Immigration Removal Centre Expansion Programme is the DS&P vehicle to deliver these 1,000 bed spaces - through the redevelopment, and expansion of two previously decommissioned IRCs Campsfield, and Haslar.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Delivery Confidence: Amber. Campsfield IRC Phase 1 - successfully accepted its first detained individual on 03/12/2025, with Optimal Occupancy achieved on 20/03/26, providing 160 beds in total. Haslar IRC Phase 1 - remains on track to complete construction in late 2026, with first detained individuals being accepted in 2027. Phase 2 - Main contractor contract award has been executed 21/04/2026 (for technical design initially), with RIBA 3 & 4 design activity commencing in 05/2026. Outline Crown Development application for Campsfield Phase 2 was submitted 13/03/26, alongside the Statement of National Importance. The Haslar Crown Development Application Notification of Intent and Ministerial ITN is on track for submission in 05/2026. IRCEP Programme - Following a NISTA Gateway 0 review in February 2025, IRCEP achieved an Amber rating. Since then 100% of NISTA's Gateway 0 recommendations have been formally discharged.","startDate":null,"endDate":"2031-03-14","scheduleNarrative":"Exempt under Section 43 - Commercial interests","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Exempt under Section 43 - Commercial interests","themes":["Commercial & supply chain","Scope & requirements","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Delivery Confidence: Amber. Campsfield IRC Phase 1 - successfully accepted its first detained individual on 03/12/2025, with Optimal Occupancy achieved on 20/03/26, providing 160 beds in total. Haslar IRC Phase 1 - remains on track to complete construction in late 2026, with first detained individuals being accepted in 2027. Phase 2 - Main contractor…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 43 - Commercial interests","narrativeClaimKind":null}],"previous":{"id":"HO_0330_2324-Q4","year":2025,"name":"Immigration Removal Centre (IRC) Expansion Programme","department":"HO","category":"Infrastructure and Construction","description":"Section 43 - Commercial interests","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Section 43 - Commercial interests","startDate":null,"endDate":null,"scheduleNarrative":"Section 43 - Commercial interests","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 43 - Commercial interests","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Section 43 - Commercial interests","themes":["Commercial & supply chain"],"evidenceExcerpt":"Section 43 - Commercial interests Section 43 - Commercial interests","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Section 43 - Commercial interests","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":null,"attentionScore":32,"attentionReasons":["Current published delivery confidence is Amber","In-year forecast variance is +43.0%"]},{"id":"MOD_0527_2526-Q1","year":2026,"name":"Mobile Fires Platform","department":"MOD","category":"Military Capability","description":"The Mobile Fires Platform (MFP) Project will deliver the long-term solution for the British Army’s Close Support artillery requirement through the procurement of the Boxer-based Remote Controlled Howitzer 155mm (RCH155). This platform represents a transformative advancement in artillery systems that will enhance the operational effectiveness and mobility of the modern British Armed Forces. MFP will be 52-cal 155mm all weather, day and night capable, automated, self-propelled gun, flexible enough to support an Army that is more precise, more lethal and agile in global operations.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26-Q4 is AMBER. This is due to the following factors. 1. The Mobile Fires Platform (MFP) Project aims to deliver a Minimal Deployable Capability (MDC) to the British Army by the end of the decade. This time frame leads to some MDC delivery risks reflected by the AMBER assessment. 2. Risks have appropriate mitigation plans and senior-level support for escalation and resolution.","startDate":null,"endDate":null,"scheduleNarrative":"The programme's end date at 25/26-Q4 remains undetermined. The MFP programme remains on track to deliver a Minimal Deployable Capability to the British Army by the end of the decade.","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"The project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. Benefits of the MFP Project are principally non-monetised.","themes":["Commercial & supply chain","Delivery & schedule","Workforce & capability","Governance & assurance"],"evidenceExcerpt":"The NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26-Q4 is AMBER. This is due to the following factors. 1. The Mobile Fires Platform (MFP) Project aims to deliver a Minimal Deployable Capability (MDC) to the British Army by the end of the decade. This time frame leads to some MDC delivery risks reflected by the AMBER assessment. 2. Risks have…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The programme's end date at 25/26-Q4 remains undetermined. The MFP programme remains on track to deliver a Minimal Deployable Capability to the British Army by the end of the decade.","narrativeClaimKind":null,"history":[{"id":"MOD_0527_2526-Q1","year":2026,"name":"Mobile Fires Platform","department":"MOD","category":"Military Capability","description":"The Mobile Fires Platform (MFP) Project will deliver the long-term solution for the British Army’s Close Support artillery requirement through the procurement of the Boxer-based Remote Controlled Howitzer 155mm (RCH155). This platform represents a transformative advancement in artillery systems that will enhance the operational effectiveness and mobility of the modern British Armed Forces. MFP will be 52-cal 155mm all weather, day and night capable, automated, self-propelled gun, flexible enough to support an Army that is more precise, more lethal and agile in global operations.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26-Q4 is AMBER. This is due to the following factors. 1. The Mobile Fires Platform (MFP) Project aims to deliver a Minimal Deployable Capability (MDC) to the British Army by the end of the decade. This time frame leads to some MDC delivery risks reflected by the AMBER assessment. 2. Risks have appropriate mitigation plans and senior-level support for escalation and resolution.","startDate":null,"endDate":null,"scheduleNarrative":"The programme's end date at 25/26-Q4 remains undetermined. The MFP programme remains on track to deliver a Minimal Deployable Capability to the British Army by the end of the decade.","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"The project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. Benefits of the MFP Project are principally non-monetised.","themes":["Commercial & supply chain","Delivery & schedule","Workforce & capability","Governance & assurance"],"evidenceExcerpt":"The NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26-Q4 is AMBER. This is due to the following factors. 1. The Mobile Fires Platform (MFP) Project aims to deliver a Minimal Deployable Capability (MDC) to the British Army by the end of the decade. This time frame leads to some MDC delivery risks reflected by the AMBER assessment. 2. Risks have…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The programme's end date at 25/26-Q4 remains undetermined. The MFP programme remains on track to deliver a Minimal Deployable Capability to the British Army by the end of the decade.","narrativeClaimKind":null}],"previous":null,"ratingDelta":null,"transition":"Not comparable","endDateDeltaDays":null,"attentionScore":32,"attentionReasons":["Current published delivery confidence is Amber","In-year forecast variance is +43.0%"]},{"id":"MOJ_0220_2223-Q4","year":2026,"name":"Property Transformation Programme","department":"MOJ","category":"Government Transformation and Service Delivery","description":"The programme aims to transform property services through the procurement of new contracts that align to Government Facilities Management (FM) Strategy, meet statutory minimum and operational requirements and lay the foundation for wider transformation.​","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25-Q4, the NISTA Delivery Confidence Assessment (DCA) at 25/26-Q4 remains at Amber. This is primarily due to uncertainty around affordability and ongoing delivery risks.","startDate":"2022-10-03","endDate":"2028-09-30","scheduleNarrative":"The programme's end date at 25/26-Q4 remains 30/09/28. The project remains on track to deliver in line with the baseline schedule.","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Exempt under Section 43 - Commercial interests","themes":["Commercial & supply chain","Delivery & schedule","Cost & funding"],"evidenceExcerpt":"Compared to financial year 24/25-Q4, the NISTA Delivery Confidence Assessment (DCA) at 25/26-Q4 remains at Amber. This is primarily due to uncertainty around affordability and ongoing delivery risks. The programme's end date at 25/26-Q4 remains 30/09/28. The project remains on track to deliver in line with the baseline schedule.","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The programme's end date at 25/26-Q4 remains 30/09/28. The project remains on track to deliver in line with the baseline schedule.","narrativeClaimKind":null,"history":[{"id":"MOJ_0220_2223-Q4","year":2024,"name":"Property Transformation Programme","department":"MOJ","category":"Government Transformation and Service Delivery","description":"The programme aims to transform property services through the procurement of new contracts that align to Government Facilities Management (FM) Strategy, meet statutory minimum and operational requirements and lay the foundation for wider transformation.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. This is the first time data has been published for this programme, which has been added to GMPP over the last year. The Amber Delivery Confidence Assessment is driven by inherent risk in the project's procurement timelines.","startDate":"2022-10-03","endDate":"2026-03-31","scheduleNarrative":"The project's end-date at 23/24-Q4 is 2026-03-31. This is primarily due to the following factors. The programme is on track to deliver against the baseline schedule.","fyBaseline":10.4,"fyForecast":10.4,"fyVariance":0.0,"varianceNarrative":"The budget variance is inferior or equal to 5%.","wholeLifeCost":7358.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 23/24-Q4 is 7358m. This is primarily due to the following factors. The Whole Life Cost has been calculated to include the option for four Service Level Options for future contracts and is subject to future decisions on scope which will have a material impact on cost.","benefits":0.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 0m. This programme currently reports no monetised benefits. The programme's benefits are related to the safe maintenance and operation of the relevant parts of the MoJ Estate.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Scope & requirements"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. This is the first time data has been published for this programme, which has been added to GMPP over the last year. The Amber Delivery Confidence Assessment is driven by inherent risk in the project's procurement…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 23/24-Q4 is 2026-03-31. This is primarily due to the following factors. The programme is on track to deliver against the baseline schedule.","narrativeClaimKind":null},{"id":"MOJ_0220_2223-Q4","year":2025,"name":"Property Transformation Programme","department":"MoJ","category":"Government Transformation and Service Delivery","description":"The programme aims to transform property services through the procurement of new contracts that align to Government Facilities Management (FM) Strategy, meet statutory minimum and operational requirements and lay the foundation for wider transformation.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The Amber Delivery Confidence Assessment is driven by inherent risk in the procurement timelines.","startDate":"2022-10-03","endDate":"2028-09-30","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2026 to 30/09/2028. This is primarily due to the following factors‚ Changes to the implementation date of the Procurement Act 2023 impacted the procurement timelines and the schedule was re-baselined.","fyBaseline":16.22,"fyForecast":11.42,"fyVariance":29.61,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The underspend is due to not needing to draw on Optimism Bias.","wholeLifeCost":6826.6,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 7358 to 6826. This is primarily due to the following factors‚ The decrease reflects the updated Outline Business Case costs following a reduction in requirements.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ This programme currently reports no monetised benefits. The programme's benefits are related to the safe maintenance and operation of the relevant parts of the MoJ Estate.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The Amber Delivery Confidence Assessment is driven by inherent risk in the procurement timelines. Compared to financial year 23/24-Q4, the project's end-date at…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2026 to 30/09/2028. This is primarily due to the following factors‚ Changes to the implementation date of the Procurement Act 2023 impacted the procurement timelines and the schedule was re-baselined.","narrativeClaimKind":null},{"id":"MOJ_0220_2223-Q4","year":2026,"name":"Property Transformation Programme","department":"MOJ","category":"Government Transformation and Service Delivery","description":"The programme aims to transform property services through the procurement of new contracts that align to Government Facilities Management (FM) Strategy, meet statutory minimum and operational requirements and lay the foundation for wider transformation.​","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25-Q4, the NISTA Delivery Confidence Assessment (DCA) at 25/26-Q4 remains at Amber. This is primarily due to uncertainty around affordability and ongoing delivery risks.","startDate":"2022-10-03","endDate":"2028-09-30","scheduleNarrative":"The programme's end date at 25/26-Q4 remains 30/09/28. The project remains on track to deliver in line with the baseline schedule.","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Exempt under Section 43 - Commercial interests","themes":["Commercial & supply chain","Delivery & schedule","Cost & funding"],"evidenceExcerpt":"Compared to financial year 24/25-Q4, the NISTA Delivery Confidence Assessment (DCA) at 25/26-Q4 remains at Amber. This is primarily due to uncertainty around affordability and ongoing delivery risks. The programme's end date at 25/26-Q4 remains 30/09/28. The project remains on track to deliver in line with the baseline schedule.","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The programme's end date at 25/26-Q4 remains 30/09/28. The project remains on track to deliver in line with the baseline schedule.","narrativeClaimKind":null}],"previous":{"id":"MOJ_0220_2223-Q4","year":2025,"name":"Property Transformation Programme","department":"MoJ","category":"Government Transformation and Service Delivery","description":"The programme aims to transform property services through the procurement of new contracts that align to Government Facilities Management (FM) Strategy, meet statutory minimum and operational requirements and lay the foundation for wider transformation.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The Amber Delivery Confidence Assessment is driven by inherent risk in the procurement timelines.","startDate":"2022-10-03","endDate":"2028-09-30","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2026 to 30/09/2028. This is primarily due to the following factors‚ Changes to the implementation date of the Procurement Act 2023 impacted the procurement timelines and the schedule was re-baselined.","fyBaseline":16.22,"fyForecast":11.42,"fyVariance":29.61,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The underspend is due to not needing to draw on Optimism Bias.","wholeLifeCost":6826.6,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 7358 to 6826. This is primarily due to the following factors‚ The decrease reflects the updated Outline Business Case costs following a reduction in requirements.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ This programme currently reports no monetised benefits. The programme's benefits are related to the safe maintenance and operation of the relevant parts of the MoJ Estate.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The Amber Delivery Confidence Assessment is driven by inherent risk in the procurement timelines. Compared to financial year 23/24-Q4, the project's end-date at…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2026 to 30/09/2028. This is primarily due to the following factors‚ Changes to the implementation date of the Procurement Act 2023 impacted the procurement timelines and the schedule was re-baselined.","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":0,"attentionScore":32,"attentionReasons":["Current published delivery confidence is Amber","In-year forecast variance is +43.0%"]},{"id":"MOD_0055_1112-Q1","year":2026,"name":"TYPE 26 GLOBAL COMBAT SHIP PROGRAMME","department":"MOD","category":"Military Capability","description":"Type 26 Global Combat Ship Programme will procure 8 x Anti Submarine Warfare (ASW) ships and associated support. The ships will deliver an interoperable, survivable, available, and adaptable capability that is operable globally within the maritime battlespace, to contribute to sea control for the Joint Force, and to contribute to maritime force projection and Joint Force command and control, with the flexibility to operate across, and within, the range and scale of contingent and non contingent operations. This eight ship programme will deliver Anti Submarine Warfare capability to protect strategic assets, sustain national shipbuilding capability, and increase the resilience of the Naval Service.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors. 1. Delay caused by a combination of outstanding engineering design volume, supply chain performance, and COVID 19 related slowdown resulted in a schedule rebaseline to programme Initial Operating Capability, which was approved in early 2022 by the MOD Investment Approvals Committee and HM Treasury. 2. Importantly, quality has not been compromised, and T26 Frigates will be world class ships.","startDate":"2008-07-21","endDate":"2037-01-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme end-date at 25/26-Q4 remained the same at 01/05/2035.","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Commercial & supply chain","Delivery & schedule","Cost & funding","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors. 1. Delay caused by a combination of outstanding engineering design volume, supply chain performance, and COVID 19 related slowdown resulted in a schedule rebaseline to programme Initial…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the programme end-date at 25/26-Q4 remained the same at 01/05/2035.","narrativeClaimKind":null,"history":[{"id":"MOD_0055_1112-Q1","year":2020,"name":"Type 26 Global Combat Ship Programme","department":"MOD","category":"Military Capability","description":"Procure 8 x Anti Submarine Warfare (ASW) ships and associated support.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber, which has declined since last year�s Q2 1819 Amber/Green, due primarily to the following factors; - The consumption of float in the schedule has required a review of the performance management baseline. At Q2 this review had not completed. In project management, float is the amount of time that a task in a project schedule can be delayed without causing a delay to subsequent tasks or project completion date. - Consumption of float expected to impact forecast dates but remain within contractual and approved dates. In project management, float is the amount of time that a task in a project schedule can be delayed without causing a delay to subsequent tasks or project completion date. Since the Q2 1920 (30th September 2019) Amber IPA DCA, the following primary project actions have impacted the original Q2 IPA DCA; - The rebaselining is complete and an Operational Plan was issued in January 2020 - Processes to release design engineering products have been addressed to reduce risk of further contingency consumption","startDate":"2008-07-21","endDate":"2035-05-01","scheduleNarrative":"The scheduled baseline project end date at Q2 1920 (30th September 2019) is 01/05/35, has not changed since last year's Q2 1819 date of 01/05/35, due primarily to the following factors; - Project closure is forecast for 2035, it is too early to predict any change to the baseline - The project closure date was a broad estimate at time of Main Gate 2. A revised, risk adjusted estimate is expected to be available at the next full approval point once we seek to move to contract for batch 2. Main Gate was the MOD major investment decision point prior to contractual commitment with industry. Under the internal MOD MAID review in 2019, the process has been modified to align to wider government practice and future major investment decisions points will be known as Full Business Case (FBC) decisions.","fyBaseline":502.38,"fyForecast":502.28,"fyVariance":0.0,"varianceNarrative":"Budget variance less than 5%","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests)","benefits":null,"benefitsNarrative":"","themes":["Delivery & schedule","Approvals & decisions","Governance & assurance","Commercial & supply chain"],"evidenceExcerpt":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber, which has declined since last year�s Q2 1819 Amber/Green, due primarily to the following factors; - The consumption of float in the schedule has required a review of the performance management baseline. At Q2 this review had not completed. In project management,…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2020","sourceLabel":"IPA Annual Report 2019-20","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The scheduled baseline project end date at Q2 1920 (30th September 2019) is 01/05/35, has not changed since last year's Q2 1819 date of 01/05/35, due primarily to the following factors; - Project closure is forecast for 2035, it is too early to predict any change to the baseline - The project closure date was a broad estimate at time of Main Gate 2. A revised, risk adjusted estimate is expected to be available at the next full approval point once we seek to move to contract for batch 2. Main Gate was the MOD major investment decision point prior to contractual commitment with industry. Under the internal MOD MAID review in 2019, the process has been modified to align to wider government practice and future major investment decisions points will be known as Full Business Case (FBC) decisions.","narrativeClaimKind":null},{"id":"MOD_0055_1112-Q1","year":2021,"name":"Type 26 Global Combat Ship Programme","department":"MOD","category":"Military Capability","description":"The Type 26 Global Combat Ship Programme will�procure eight Anti Submarine Warfare ships and associated support. � This eight ship programme will deliver Anti-Submarine Warfare capability to protect strategic assets, sustain national shipbuilding capability and increase the resilience of the Naval Service.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber. This is primarily due to the following factors: The Amber Delivery Confidence�is�considered appropriate given�the COVID-19 impact on schedule, the performance of the supply chain and�greater than forecast volume of engineering design work. COVID - During the first COVID lockdown production in the Govan yard was paused by 4 weeks to enable�revised safe systems of work to be put in place. Work has recommenced and the production rate has since stabilised. Supply Chain -�Delivery of�key components�have been delayed�due to poor supplier performance in progressing the Factory Acceptance Tests.� Maintaining quality control has been prioritised to ensure the performance of the T26�meets the user requirements and de-risks the downstream programme. Engineering Design -�The volume of design work to complete prior to commencing production in some areas of the ship has impacted schedule.� The�design work is forecasted to reduce�to a steady state level by the end of the calendar year 2021.","startDate":"2008-07-21","endDate":"2035-05-01","scheduleNarrative":"Compared to financial year 19/20-Q2, the project's end-date remained scheduled to finish on 01 May 2035 . This is primarily due to the following factors: Schedule delay caused by a combination of outstanding engineering design volume, supply chain performance and Covid 19 related slowdown has consumed project float for the first 3 ships. The detailed impact to delivery forecasts are under analysis. Any impact to Vessel Acceptance Dates will be reported once the company and Defence Equipment & Support have completed their review in Summer 2021. Cut steel for ship 4 and project end date remains on track.�","fyBaseline":581.98,"fyForecast":554.5,"fyVariance":-5.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"","themes":["Delivery & schedule","Commercial & supply chain","Scope & requirements","Cost & funding"],"evidenceExcerpt":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber. This is primarily due to the following factors: The Amber Delivery Confidence�is�considered appropriate given�the COVID-19 impact on schedule, the performance of the supply chain and�greater than forecast volume of engineering…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 19/20-Q2, the project's end-date remained scheduled to finish on 01 May 2035 . This is primarily due to the following factors: Schedule delay caused by a combination of outstanding engineering design volume, supply chain performance and Covid 19 related slowdown has consumed project float for the first 3 ships. The detailed impact to delivery forecasts are under analysis. Any impact to Vessel Acceptance Dates will be reported once the company and Defence Equipment & Support have completed their review in Summer 2021. Cut steel for ship 4 and project end date remains on track.�","narrativeClaimKind":null},{"id":"MOD_0055_1112-Q1","year":2022,"name":"Type 26 Global Combat Ship Programme","department":"MOD","category":"Military Capability","description":"Type 26 Global Combat Ship Programme will procure 8 x Anti Submarine Warfare ships and associated support. To deliver an interoperable, survivable, available and adaptable capability that is operable globally within the maritime battle space to contribute to sea control for the Joint Force and contribute to maritime force projection and Joint Force command and control with the flexibility to operate across and within the range and scale of Contingent and non-Contingent operations. This 8 ship programme will deliver Anti-Submarine Warfare capability to protect strategic assets, sustain national shipbuilding capability and increase resilience of the Naval Service.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber. This is primarily due to the following factors: Schedule delay, caused by a combination of outstanding engineering design volume, supply chain performance and COVID related slowdown has caused delay to the programme Initial Operating Capability which is currently being considered for approval by the MOD Investment Approvals Committee and HM Treasury. Importantly, quality has not been compromised and Type 26 Frigates will be world class ships delivered in time to replace their Type 23 counterparts. The Delivery Confidence Assessment report from the Support Gateway Review completed in Jul 21 rated the programme as Amber.","startDate":"2008-07-21","endDate":"2035-05-01","scheduleNarrative":"Compared to 2021-Q4 the project end-date remained scheduled to finish on 1 May 35. This is primarily due to the following factors: Despite delay caused by engineering design issues, supply chain performance and the impact of COVID19 and subsequent safe systems of work the schedule has been held.","fyBaseline":639.0,"fyForecast":634.0,"fyVariance":0.0,"varianceNarrative":"The budget variance is inferior or equal to 5%.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests)","benefits":null,"benefitsNarrative":"","themes":["Delivery & schedule","Commercial & supply chain","Cost & funding","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber. This is primarily due to the following factors: Schedule delay, caused by a combination of outstanding engineering design volume, supply chain performance and COVID related slowdown has caused delay to the programme Initial…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to 2021-Q4 the project end-date remained scheduled to finish on 1 May 35. This is primarily due to the following factors: Despite delay caused by engineering design issues, supply chain performance and the impact of COVID19 and subsequent safe systems of work the schedule has been held.","narrativeClaimKind":null},{"id":"MOD_0055_1112-Q1","year":2023,"name":"Type 26 Global Combat Ship Programme","department":"MOD","category":"Military Capability","description":"Type 26 Global Combat Ship Programme will procure 8 x Anti Submarine Warfare ships and associated support. The ships will deliver an interoperable, survivable, available and adaptable capability that is operable globally within the maritime battle space to contribute to sea control for the Joint Force and contribute to maritime force projection and Joint Force command and control with the flexibility to operate across and within the range and scale of Contingent and non-Contingent operations. This 8 ship programme will deliver Anti-Submarine Warfare capability to protect strategic assets, sustain national shipbuilding capability and increase resilience of the Naval Service.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber (SRO rating). This is primarily due to the following factors. Delay caused by a combination of outstanding engineering design volume, supply chain performance and COVID related slowdown has resulted in a re-baseline to Initial Operating Capability, which was approved earlier in the year. Importantly, quality has not been compromised and T26 Frigates will be world class ships delivered in time to replace their T23 counterparts.","startDate":"2008-07-21","endDate":"2035-05-01","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2035-05-01. This is primarily due to the following factors. NA","fyBaseline":816.77,"fyForecast":814.78,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This programme does not report cashable benefits. Its aim is to provision the armed forces with the equipment and / or infrastructure required.","themes":["Commercial & supply chain","Cost & funding","Delivery & schedule","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber (SRO rating). This is primarily due to the following factors. Delay caused by a combination of outstanding engineering design volume, supply chain performance and COVID related slowdown has resulted in a re-baseline to Initial Operating Capability,…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2035-05-01. This is primarily due to the following factors. NA","narrativeClaimKind":null},{"id":"MOD_0055_1112-Q1","year":2024,"name":"Type 26 Global Combat Ship Programme","department":"MOD","category":"Military Capability","description":"Type 26 Global Combat Ship Programme will procure eight Anti Submarine Warfare (ASW) ships and associated support. The ships will deliver an interoperable, survivable, available and adaptable capability, that is operable globally within the maritime battle space, to contribute to sea control for the Joint Force and contribute to maritime force projection and Joint Force command and control, with the flexibility to operate across and within the range and scale of Contingent and non-Contingent operations. This eight ship programme will deliver Anti-Submarine Warfare capability to protect strategic assets, sustain national shipbuilding capability and increase the resilience of the Naval Service.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. Delay caused by a combination of outstanding engineering design volume; supply chain performance and COVID19 related slowdown resulted in a schedule re-baseline to programme Initial Operating Capability. Importantly, quality has not been compromised and T26 Frigates will be world class ships delivered in time to replace their T23 counterparts.","startDate":"2008-07-21","endDate":"2035-05-01","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained on schedule to finish on 2035-05-01.","fyBaseline":677.21,"fyForecast":693.57,"fyVariance":2.416,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.)","benefits":0.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 0m.","themes":["Delivery & schedule","Commercial & supply chain","Cost & funding","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. Delay caused by a combination of outstanding engineering design volume; supply chain performance and COVID19 related slowdown resulted in a schedule re-baseline to…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained on schedule to finish on 2035-05-01.","narrativeClaimKind":null},{"id":"MOD_0055_1112-Q1","year":2025,"name":"TYPE 26 GLOBAL COMBAT SHIP PROGRAMME","department":"MoD","category":"Military Capability","description":"The Type 26 Global Combat Ship Programme will procure 8 x Anti Submarine Warfare (ASW) ships and associated support. The ships will deliver an interoperable, survivable, available and adaptable capability that is operable globally within the maritime battle space, to contribute to sea control for the Joint Force and contribute to maritime force projection and Joint Force command and control, with the flexibility to operate across and within the range and scale of Contingent and non-Contingent operations. This eight ship programme will deliver Anti-Submarine Warfare capability to protect strategic assets, sustain national shipbuilding capability and increase the resilience of the Naval Service.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Project's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER, compared with the Infrastructure and Projects Authority's assessment last year of AMBER. This is due to the following factors. Delay caused by a combination of outstanding engineering design volume, supply chain performance and COVID19 related slowdown resulted in a schedule re-baseline to the programme's Initial Operating Capability, which was approved in early 2022. Importantly, quality has not been compromised and T26 Frigates will be world class ships delivered in time to replace their T23 counterparts.","startDate":"2008-07-21","endDate":null,"scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 01/05/2035. .","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 43 - Commercial interests","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits","themes":["Commercial & supply chain","Delivery & schedule","Scope & requirements","Cost & funding"],"evidenceExcerpt":"The Project's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER, compared with the Infrastructure and Projects Authority's assessment last year of AMBER. This is due to the following factors. Delay caused by a combination of outstanding engineering design volume, supply chain performance and COVID19 related slowdown resulted in a schedule…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 01/05/2035. .","narrativeClaimKind":null},{"id":"MOD_0055_1112-Q1","year":2026,"name":"TYPE 26 GLOBAL COMBAT SHIP PROGRAMME","department":"MOD","category":"Military Capability","description":"Type 26 Global Combat Ship Programme will procure 8 x Anti Submarine Warfare (ASW) ships and associated support. The ships will deliver an interoperable, survivable, available, and adaptable capability that is operable globally within the maritime battlespace, to contribute to sea control for the Joint Force, and to contribute to maritime force projection and Joint Force command and control, with the flexibility to operate across, and within, the range and scale of contingent and non contingent operations. This eight ship programme will deliver Anti Submarine Warfare capability to protect strategic assets, sustain national shipbuilding capability, and increase the resilience of the Naval Service.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors. 1. Delay caused by a combination of outstanding engineering design volume, supply chain performance, and COVID 19 related slowdown resulted in a schedule rebaseline to programme Initial Operating Capability, which was approved in early 2022 by the MOD Investment Approvals Committee and HM Treasury. 2. Importantly, quality has not been compromised, and T26 Frigates will be world class ships.","startDate":"2008-07-21","endDate":"2037-01-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme end-date at 25/26-Q4 remained the same at 01/05/2035.","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Commercial & supply chain","Delivery & schedule","Cost & funding","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors. 1. Delay caused by a combination of outstanding engineering design volume, supply chain performance, and COVID 19 related slowdown resulted in a schedule rebaseline to programme Initial…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the programme end-date at 25/26-Q4 remained the same at 01/05/2035.","narrativeClaimKind":null}],"previous":{"id":"MOD_0055_1112-Q1","year":2025,"name":"TYPE 26 GLOBAL COMBAT SHIP PROGRAMME","department":"MoD","category":"Military Capability","description":"The Type 26 Global Combat Ship Programme will procure 8 x Anti Submarine Warfare (ASW) ships and associated support. The ships will deliver an interoperable, survivable, available and adaptable capability that is operable globally within the maritime battle space, to contribute to sea control for the Joint Force and contribute to maritime force projection and Joint Force command and control, with the flexibility to operate across and within the range and scale of Contingent and non-Contingent operations. This eight ship programme will deliver Anti-Submarine Warfare capability to protect strategic assets, sustain national shipbuilding capability and increase the resilience of the Naval Service.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Project's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER, compared with the Infrastructure and Projects Authority's assessment last year of AMBER. This is due to the following factors. Delay caused by a combination of outstanding engineering design volume, supply chain performance and COVID19 related slowdown resulted in a schedule re-baseline to the programme's Initial Operating Capability, which was approved in early 2022. Importantly, quality has not been compromised and T26 Frigates will be world class ships delivered in time to replace their T23 counterparts.","startDate":"2008-07-21","endDate":null,"scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 01/05/2035. .","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 43 - Commercial interests","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits","themes":["Commercial & supply chain","Delivery & schedule","Scope & requirements","Cost & funding"],"evidenceExcerpt":"The Project's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER, compared with the Infrastructure and Projects Authority's assessment last year of AMBER. This is due to the following factors. Delay caused by a combination of outstanding engineering design volume, supply chain performance and COVID19 related slowdown resulted in a schedule…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 01/05/2035. .","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":null,"attentionScore":32,"attentionReasons":["Current published delivery confidence is Amber","In-year forecast variance is +43.0%"]},{"id":"DCMS_0013_1819-Q3","year":2026,"name":"4th National Lottery Licence","department":"DCMS","category":"Government Transformation and Service Delivery","description":"The 4th National Lottery Competition Programme is responsible for ensuring the continuation of the National Lottery on the expiry of the 3rd Licence at the end of January 2024. This involved designing a new licence fit for the future and selecting an operator via a competitive application process who is able to continue to develop the National Lottery as a public asset in order to maximise the returns to good causes whilst also ensuring the highest standards of propriety and player protection.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25-Q4, NISTA's Delivery Confidence Assessment rating at 25/26-Q3 increased from RED to AMBER.This is primarily due to the following factors‚ during 25/26, Allwyn were able to successfully complete both Retail (RCO) and Digital Cutover (DCO) activities bringing the project in line with expected deadlines. Following AELs delivery of DCO in January 2026 the Programme increased from AMBER to GREEN (25/26-Q4).","startDate":"2018-11-16","endDate":"2026-05-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 increased from 31/12/2025 to 31/05/2026. This is primarily due to the following factors‚ Following Allwyn's Implementation Notice issued in November 2024, Fully Implemented Commencement was expected to be delivered by late 2025. Allwyn delivered digital cutover on the weekend of 24/25 January 2026 and the Commission's Board determined that they had delivered Fully Implemented Commencement on 19 March 2026. There are some final closure activities taking place between mid March and the end of May 2026 before the NISTA Gate 5a and Programme closure.","fyBaseline":16.9,"fyForecast":14.3,"fyVariance":15.42,"varianceNarrative":"Reliance on external legal and external consultants has reduced in 25/26 compared to budget, and has been reprofiled into 26/27. No impact on overall life cost.","wholeLifeCost":174.46,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 increased from £154.8m to £168.2m (£13.4m). This is primarily due to the following factors: • 4NLR budget was increased by £8.36m: o Delay to Full Implementation causing BAU an Implementation to run in parallel o aspects of regulation have proved more complex and therefore more resource intensive for Licensing than anticipated o Retention of additional roles that were once considered to be required for bedding in period only, with additional support around enforcement, finance, and stakeholder management/project delivery o Increased contingency primarily to account for situations where additional legal resources or external advice is needed. • Programme and Recoverable Implementation Costs (RICs) budget was increased by £5.02m , we are currently working within the FBC Scenario 2 resource and timeline (RICs completion forecast 31 Jan 27), scenarios 3 & 4 increase the Programme by c2 months each. The increase was required to accommodate Allwyn’s delay in testing and loss of contingency time and not being able to deliver Full Functionality by the Fall Back Delayed Date in Feb ‘25 Please note figures referenced in the narratives were entered as nominal and the system automatically converts them to Real Terms.","benefits":24230.06,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained the same as last year at 20643.","themes":["Cost & funding","Delivery & schedule","Technical & integration","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 24/25-Q4, NISTA's Delivery Confidence Assessment rating at 25/26-Q3 increased from RED to AMBER.This is primarily due to the following factors‚ during 25/26, Allwyn were able to successfully complete both Retail (RCO) and Digital Cutover (DCO) activities bringing the project in line with expected deadlines. Following AELs delivery…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 increased from 31/12/2025 to 31/05/2026. This is primarily due to the following factors‚ Following Allwyn's Implementation Notice issued in November 2024, Fully Implemented Commencement was expected to be delivered by late 2025. Allwyn delivered digital cutover on the weekend of 24/25 January 2026 and the Commission's Board determined that they had delivered Fully Implemented Commencement on 19 March 2026. There are some final closure activities taking place between mid March and the end of May 2026 before the NISTA Gate 5a and Programme closure.","narrativeClaimKind":null,"history":[{"id":"DCMS_0013_1819-Q3","year":2020,"name":"4th National Lottery Licence Competition","department":"DCMS","category":"Government Transformation and Service Delivery","description":"The project aims to run a competition to award the next National Lottery licence (4th), that delivers statutory duties of due propriety and player protection, while incentivising responsible innovation and maximising returns to good causes.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber, due primarily to the following factors; - The arrival of Rothschild & Co (R&Co) as lead advisors and recruitment of experienced Commercial Director, on secondment from Government Commercial Organisation, provided confidence that senior leadership was in place to manage the programme. - A more detailed schedule of market engagement commenced in September with a broader range of organisations including technology firms and finance providers in addition to established lottery operators. Since the Q2 1920 (30th September 2019) Amber IPA DCA, the following non-project operating environment activities have impacted the original Q2 IPA DCA; - The requirement to follow the HMT-led Treasury Approval Point (TAP) process, and specifically its deferral until after the March 2020 Budget, introduced a 3-month delay to the start of the competition. This action consumed programme contingency but the end date is unaltered, and delivery confidence unaffected because the delay was used to mature competition documentation and engage further with market. Since the Q2 1920 (30th September 2019) Amber IPA DCA, the following primary project actions have impacted the original Q2 IPA DCA; - The Draft Invitation to Apply (ITA) and draft Licence were published to market in December 2019 and feedback received in January 2020. This exercise flushed out a number of issues with the market and allowed us to address them in final versions of competition documentation, giving us greater confidence that our requirements would be understood and acceptable to potential applicants. - An extensive assurance and audit plan was delivered. Including: IPA Gateway 2 review; internal audit of Outline Business Case, Incentive Mechanism, and Evaluation Framework; engagement with Cabinet Office complex transactions team; shadow bid reviews to test how suppliers might 'game' competition; and testing of game assessment processes. These actions increased confidence in the quality of the competition documents and processes.","startDate":"2018-11-16","endDate":"2023-08-01","scheduleNarrative":"The scheduled project end date at Q2 1920 (30th September 2019) is 01/08/23, due primarily to the following factors; - The Third Licence expires in February 2023, followed by a 6-month project close down period. - Allows for up to 2 years transition period following the conclusion of the competition and award of Preferred Licensee. Since the Q2 1920 (30th September 2019) baseline project end date of 01/08/23, the following non-project operating environment activities have impacted the original Q2 baseline project end date; - The requirement to follow the HMT-led Treasury Approval Point (TAP) process, and specifically its deferral until after the March 2020 Budget, introduced a 3-month delay to the start of the competition. This action consumed programme contingency but the end date is unaltered. - The advent of the COVID-19 pandemic, and the possibility of multiple lockdowns, increases the risk that competition processes have to be extended. Delaying the result of the competition will reduce the period for transition and increases the risk of having to extend the Third Licence. Since the Q2 1920 (30th September 2019) baseline project end date of 01/08/23, the following primary project actions have impacted the original Q2 baseline project end date; - Whilst waiting for TAP (Treasury Approval Point) to convene, we took opportunity to conduct further engagement with market and share more information to help potential applicants prepare their responses when competition started. - We have conducted an impact analysis on the programme schedule of various COVID-19 lockdown scenarios and have revised Business Continuity Plans to improve preparedness and resilience.","fyBaseline":7.84,"fyForecast":13.21,"fyVariance":68.0,"varianceNarrative":"The 19/20 in-year baseline / forecast variance at Q2 1920 (30th September 2019) of 68%, is due primarily to the following factors; - Rescoped commercial strategy and approach in terms of the nature of the competition we were seeking to generate. Took opportunity to explore wider sources of investment capital and interest in the competition in the finance and technology sectors. - Appointment of Rothschild & Co (R&Co) as lead advisor to engage with the market, and changes to scope and timing of other contractors work. Since the Q2 1920 (30th September 2019) 19/20 in-year baseline / forecast variance of 68%, the following primary project actions have impacted the original Q2 19/20 in-year variance; - Improved programme and financial controls have been implemented to ensure the programme stays within the uplifted budget. - Gambling Commission appointed a permanent Chief Financial Officer and internal auditors have reviewed in-year costs and future budget estimates (in Outline Business Case).","wholeLifeCost":64.34,"costNarrative":"The baseline Whole Life Cost at Q2 1920 (30th September 2019) is �64.34 m, due primarily to the following factors; - Approximately half of the whole-life costs are incurred in the design of the Licence, running the competition for the operator, and managing the transition period from Third to Fourth National Lottery Licensee. - The cost of regulating the Fourth Licence for 10 years is the remainder of the whole-life costs. For the purposes of estimating at this stage, we assume the cost of regulation is the same as that for the Third Licence, c�3.15m/year. Since the Q2 1920 (30th September 2019) �64.34 m baseline Whole Life Cost, the following non-project operating environment activities have impacted the original baseline Q2 Whole Life Cost; - The requirement to follow the HMT-led Treasury Approval Point (TAP) process, and specifically its deferral until after the March 2020 Budget, introduced a 3-month delay to the start of the competition. Consequently, some programme costs have slipped into later years (FY21/22 and FY22/23). The impact will be confirmed in due course in the Full Business Case. Since the Q2 1920 (30th September 2019) �64.34 m baseline Whole Life Cost, the following primary project actions have impacted the original Q2 baseline Whole Life Cost; - In the course of developing the Outline Business Case, there was a re-appraisal of the resources required to run the competition effectively. Increasing the strength of the evaluation teams, both with Commission and external subject matter experts, will ensure a better quality process. - Decision to procure a Transition, Technology and Operations partner earlier than originally planned has increased whole-life costs, but will ensure the risks inherent in the transition period can be effectively managed.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Approvals & decisions","Commercial & supply chain","Delivery & schedule"],"evidenceExcerpt":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber, due primarily to the following factors; - The arrival of Rothschild & Co (R&Co) as lead advisors and recruitment of experienced Commercial Director, on secondment from Government Commercial Organisation, provided confidence that senior leadership was in place to…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2020","sourceLabel":"IPA Annual Report 2019-20","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The scheduled project end date at Q2 1920 (30th September 2019) is 01/08/23, due primarily to the following factors; - The Third Licence expires in February 2023, followed by a 6-month project close down period. - Allows for up to 2 years transition period following the conclusion of the competition and award of Preferred Licensee. Since the Q2 1920 (30th September 2019) baseline project end date of 01/08/23, the following non-project operating environment activities have impacted the original Q2 baseline project end date; - The requirement to follow the HMT-led Treasury Approval Point (TAP) process, and specifically its deferral until after the March 2020 Budget, introduced a 3-month delay to the start of the competition. This action consumed programme contingency but the end date is unaltered. - The advent of the COVID-19 pandemic, and the possibility of multiple lockdowns, increases the risk that competition processes have to be extended. Delaying the result of the competition will reduce the period for transition and increases the risk of having to extend the Third Licence. Since the Q2 1920 (30th September 2019) baseline project end date of 01/08/23, the following primary project actions have impacted the original Q2 baseline project end date; - Whilst waiting for TAP (Treasury Approval Point) to convene, we took opportunity to conduct further engagement with market and share more information to help potential applicants prepare their responses when competition started. - We have conducted an impact analysis on the programme schedule of various COVID-19 lockdown scenarios and have revised Business Continuity Plans to improve preparedness and resilience.","narrativeClaimKind":null},{"id":"DCMS_0013_1819-Q3","year":2021,"name":"4th National Lottery Licence Competition","department":"DCMS","category":"Government Transformation and Service Delivery","description":"The 4th National Lottery Licence Competition Programme is responsible for ensuring the continuation of the National Lottery on the expiry of the current 3rd Licence in July 2023. This involves designing a new licence fit for the future and selecting an operator via a competitive application process who is able to continue to develop the National Lottery as a public asset in order to maximise the returns to good causes whilst also ensuring the highest standards of propriety and player protection.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber. This is primarily due to the following factors: The overall programme lifecycle delivery confidence was rated as AMBER by the Infrastructure and Projects Authority at the Gate 2 review undertaken at the end of July 2020, given the longer-term impact of COVID-19 on applicants and the overall risk profile of the Programme. The programme is confident that it will be in a position to improve the current IPA Amber rating within quarter 1 (21/22). The improvement will be demonstrated by agreeing the final timing for approval of the Full Business Case and the expected continuation of a high number and strength of applicants remaining active within the competition.","startDate":"2018-11-16","endDate":"2024-02-01","scheduleNarrative":"Compared to financial year 19/20-Q2, the project's end-date increased from 01 August 2023 to 01 February 2024 . This is primarily due to the following factors: The programme end date has moved from 1 Aug 23 to 1 Feb 24 in response to delays caused by Covid19. Potential applicants raised concerns about assembling application teams and preparing their applications during the lockdown restrictions so to ensure applicants didn't withdraw from the competition and to maintain a strong competitive field of applicants a six month extension to the programme was agreed. In order to delay the start of the 4th Licence by 6 months, it has been necessary to extend the existing 3rd Lottery licence by six months so there is no interruption to the National Lottery.","fyBaseline":16.35,"fyForecast":15.03,"fyVariance":-8.0,"varianceNarrative":"The budget variance exceeds 5%. The yearly costs are lower than expected because of the deferment of competition evaluation costs to the following year as well as cost savings made on professional services to support the programme as more activity was able to be undertaken in house. The competition evaluation costs were deferred because the initial engagement from applicants to the Invitation to Apply for the 4th Licence was much higher than expected resulting in additional time being required for them to submit their phase 1 applications which in turn pushed the evaluation period and costs into the following financial year. Although this has caused a slight delay, the level of engagement from applicants indicates a strong competition which should generate highly competitive applications.","wholeLifeCost":91.92,"costNarrative":"Compared to financial year 19/20-Q2, the projects Baseline Whole Life Cost increased from �64.34m to �91.92m. This is primarily due to the following factors: The increase in whole life costs is due to two main factors. Firstly, a more thorough and robust competition with far greater engagement with the market and potential applicants which has resulted in a strong and highly competitive competition. Secondly, the costs have also increased because of the six month extension to the programme in response to the delays caused by Covid19.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber. This is primarily due to the following factors: The overall programme lifecycle delivery confidence was rated as AMBER by the Infrastructure and Projects Authority at the Gate 2 review undertaken at the end of July 2020, given…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 19/20-Q2, the project's end-date increased from 01 August 2023 to 01 February 2024 . This is primarily due to the following factors: The programme end date has moved from 1 Aug 23 to 1 Feb 24 in response to delays caused by Covid19. Potential applicants raised concerns about assembling application teams and preparing their applications during the lockdown restrictions so to ensure applicants didn't withdraw from the competition and to maintain a strong competitive field of applicants a six month extension to the programme was agreed. In order to delay the start of the 4th Licence by 6 months, it has been necessary to extend the existing 3rd Lottery licence by six months so there is no interruption to the National Lottery.","narrativeClaimKind":null},{"id":"DCMS_0013_1819-Q3","year":2022,"name":"4th National Lottery Licence Competition","department":"DCMS","category":"Government Transformation and Service Delivery","description":"The 4th National Lottery Competition Programme is responsible for ensuring the continuation of the National Lottery on the current expiry of the current 3rd Licence at the end of January 2024. This involves designing a new licence fit for the future and selecting an operator via a competitive application process who is able to continue to develop the National Lottery as a public asset in order to maximise the returns to good causes whilst also ensuring the highest standards of propriety and player protection.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 remained at Amber ?The latest Infrastructure and Projects Authority (IPA) Gate 3 review and final report rated the Programme as Amber on its conclusion. All recommendations have been addressed by the Programme and supported the approval of the recent Full Business Case by HM Treasury approved in March 2022. The Programme has a DCA rating of amber. This is because there has been a delay to the Award Notification due to legal challenges post the competition outcome notification. The resulting delay to the start of the Implementation Period have the potential to significantly impact cost/time.","startDate":"2018-11-16","endDate":"2024-02-01","scheduleNarrative":"Compared to 2021-Q4, your project end-date remained scheduled to finish on 01 FEB 2024 . This is primarily due to the following factors: The programme end date of 1st February 2024 reflects the start of the 4th Licence.","fyBaseline":24.32,"fyForecast":24.32,"fyVariance":0.0,"varianceNarrative":"The budget variance is inferior or equal to 5%.","wholeLifeCost":155.0,"costNarrative":"Compared to2021-Q4, the projects Baseline Whole Life Cost increased from 91.92 (£m) to 154.87 (£m). This is primarily due to the following factors: The previous figure of £91.92 (£m) was used in the OBC addendum, it was noted in the return that Implementation Costs would increase whole life costs were submitted as part of the Full Business Case that was approved in March 2022. (The OBC cost are about evaluating few selected options before committing to one, which happens at FBC).","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 remained at Amber ?The latest Infrastructure and Projects Authority (IPA) Gate 3 review and final report rated the Programme as Amber on its conclusion. All recommendations have been addressed by the Programme and supported the…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to 2021-Q4, your project end-date remained scheduled to finish on 01 FEB 2024 . This is primarily due to the following factors: The programme end date of 1st February 2024 reflects the start of the 4th Licence.","narrativeClaimKind":null},{"id":"DCMS_0013_1819-Q3","year":2023,"name":"4th National Lottery Licence Competition","department":"DCMS","category":"Government Transformation and Service Delivery","description":"The 4th National Lottery Competition Programme is responsible for ensuring the continuation of the National Lottery on the current expiry of the current 3rd Licence at the end of January 2024. This involves designing a new licence fit for the future and selecting an operator via a competitive application process who is able to continue to develop the National Lottery as a public asset in order to maximise the returns to good causes whilst also ensuring the highest standards of propriety and player protection.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber (SRO rating). This is primarily due to the following factors. The latest Infrastructure and Projects Authority (IPA) Gate 3 review and final report rated the Programme as Amber on its conclusion. All recommendations have been addressed by the Programme. The Programme is currently in conversation with the IPA to plan the Gate 4 review, most likely to be in September 2023. Since last year, the Commission successfully applied to lift the suspension on the Programme and the licence was awarded to Allwyn UK Limited, and transition to the 4th Licence started. However, there continues to be a challenge to the outcome of the competition which the Commission is defending. The Programme's DCA rating remains Amber.","startDate":"2018-11-16","endDate":"2024-02-01","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2024-02-01. This is primarily due to the following factors. The programme end date of 1st February 2024 reflects the start of the 4th Licence.","fyBaseline":45.31,"fyForecast":19.64,"fyVariance":-57.0,"varianceNarrative":"The budget variance exceeds 5%. Due to delays in implementation caused by the legal cases, we are saving money on implementation in 22/23. Litigation costs have been added to the budget and forecast in 22/23 with the underspends in 22/23 added to the forecast in 23/24. Whole life project costs are now 177.47m; this has increased due to the additional litigation budget of 22.6m required for our court cases which was a contingent liability in our business case. The profiling of this is between 22/23 and 23/24. A delay in the court cases to January 2024 has caused variances between budgets and forecasts, however we have approval to carry over unused litigation budget to 23/24, preventing an overspend.","wholeLifeCost":177.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 increased from 155m. to 177m. This is primarily due to the following factors. The budget has increased due to Litigation costs, a budget of 22.6m has been provided.","benefits":22284.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 22284m. The project's departmental-agree monetised benefits at 22/23-Q4 is 22284m.The project's departmental-agree monetised benefits at 22/23-Q4 is 22284m.The project's departmental-agree monetised benefits at 22/23-Q4 is 22284m. As set out in the Final Business Case, the programmes benefits realisation approach comprises of 3 broad activities: programme-level evaluation, monitoring and evaluation of individual workstreams during implementation and monitoring and evaluation of the Commissions approach to regulating during the 4th Licence. During the implementation phase, the benefits reporting will focus on development of individual workstreams (as set out in the business case). The overall benefits of the programme (Increased returns to good causes) will be delivered by Allwyn and dependent on the implementation phase delivering. To note, it is the responsibility of the Incoming Licensee to develop its own methodology and forecasting for benefits during the 4th licence period - this will be provided to the Gambling Commission c.6 months prior to the start of the 4th licence and tracked throughout the licence.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber (SRO rating). This is primarily due to the following factors. The latest Infrastructure and Projects Authority (IPA) Gate 3 review and final report rated the Programme as Amber on its conclusion. All recommendations have been addressed by the…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2024-02-01. This is primarily due to the following factors. The programme end date of 1st February 2024 reflects the start of the 4th Licence.","narrativeClaimKind":null},{"id":"DCMS_0013_1819-Q3","year":2024,"name":"4th National Lottery Licence Competition","department":"DCMS","category":"Government Transformation and Service Delivery","description":"The 4th National Lottery Competition Programme is responsible for ensuring the continuation of the National Lottery on the current expiry of the current 3rd Licence at the end of January 2024. This involves designing a new licence fit for the future and selecting an operator via a competitive application process who is able to continue to develop the National Lottery as a public asset in order to maximise the returns to good causes whilst also ensuring the highest standards of propriety and player protection.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. The Infrastructure and Projects Authority (IPA) conducted its Gate 4a review in October 2023 and all recommendations have been addressed by the Programme, As agreed, Gate 4 was split into Part a and Part b with Part b due to take place in Autumn 2024 and focusing on Fully Implemented Commencement. The Programme is also undertaking an ongoing review by the Government Internal Audit Agency and the Programme's DCA rating remains Amber and in March 2024 underwent a DCMS Delivery and Risk Committee Audit.","startDate":"2018-11-16","endDate":"2025-02-28","scheduleNarrative":"The project's end-date at 23/24-Q4 is 2025-02-28. This is primarily due to the following factors. The Full Implementation Commencement date of 28th February 2025 reflects the main delivery deadline. The GC's 4NL Programme end date is set as May 2025, to ensure closure after FIC.","fyBaseline":15.59,"fyForecast":12.56,"fyVariance":-19.0,"varianceNarrative":"The budget variance exceeds 5%. The baseline figures have been revised as per the FBC Addendum v2 due to a reprofiling process. The year in under spend of -3m will be used in contingency. The variance is due to litigation costs reducing due to in house work. Cross charges from the Gambling commission reduced as estimates were replaced by actual figures.","wholeLifeCost":177.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agreed Whole Life Cost at 23/24-Q4 remained at 177m.","benefits":20643.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agreed monetised benefits at 23/24-Q4 decreased from 22284m. to 20643m. The decrease between 22/23 and 23/24 in monetised benefits noted above is due to revised assumptions over the period to reflect the passage of time, and are set out in the Business Case Addendum v2. Specifically these relate to changes in the prevailing macro-economic environment, leading to a revised assumed baseline figure for the exit point of the preceding 3rd Licence, and updated forecast sales assumptions over the Incoming Licensee's tenure, among other factors.","themes":["Cost & funding","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. The Infrastructure and Projects Authority (IPA) conducted its Gate 4a review in October 2023 and all recommendations have been addressed by the Programme, As agreed, Gate 4 was split into Part a and Part b with Part b…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 23/24-Q4 is 2025-02-28. This is primarily due to the following factors. The Full Implementation Commencement date of 28th February 2025 reflects the main delivery deadline. The GC's 4NL Programme end date is set as May 2025, to ensure closure after FIC.","narrativeClaimKind":null},{"id":"DCMS_0013_1819-Q3","year":2025,"name":"4th National Lottery Licence","department":"DCMS","category":"Government Transformation and Service Delivery","description":"The 4th National Lottery Competition Programme is responsible for ensuring the continuation of the National Lottery on the expiry of the 3rd Licence at the end of January 2024. This involved designing a new licence fit for the future and selecting an operator via a competitive application process who is able to continue to develop the National Lottery as a public asset in order to maximise the returns to good causes whilst also ensuring the highest standards of propriety and player protection.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 decreased from AMBER to RED. This is primarily due to the following factors‚ In the latter half of the 24/25 year, Allwyn suffered increasing delays and setbacks with testing across its work streams. Without any contingency remaining in the plan, it became increasingly unlikely that Fully Implemented Commencement (FIC) would be achieved by the delayed date in February 2025. The Programme's Delivery Confidence Assessment was therefore downgraded from Amber to Red.","startDate":"2018-11-16","endDate":"2025-12-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 28/02/2025 to 31/12/2025. This is primarily due to the following factors‚ In November 2024, Allwyn issued an Implementation Issue Notice to formally notify the Commission that the Fully Implemented Commencement would not be achieved by February 2025 as expected. During the first half of 2025, Allwyn have been considering options to enable safe technical cutover of the digital front end platform which has consequently pushed the end date of the project to 31/12/25.","fyBaseline":17.0,"fyForecast":16.37,"fyVariance":3.71,"varianceNarrative":"The budget variance is less than or equal to 5%. n/a - less than 5%","wholeLifeCost":154.85,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 177 to 154. This is primarily due to the following factors‚ The 23/24 report incorrectly included £23m of litigation costs in the return. The litigation budget sits outside of the WLC for 4NL so the 24/25 return for WLC was reduced from £177m to £154m in line with the FBC.","benefits":20643.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 20643. This is primarily due to the following factors‚ There has been no change to the benefits","themes":["Cost & funding","Technical & integration","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 decreased from AMBER to RED. This is primarily due to the following factors‚ In the latter half of the 24/25 year, Allwyn suffered increasing delays and setbacks with testing across its work streams. Without any contingency remaining…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 28/02/2025 to 31/12/2025. This is primarily due to the following factors‚ In November 2024, Allwyn issued an Implementation Issue Notice to formally notify the Commission that the Fully Implemented Commencement would not be achieved by February 2025 as expected. During the first half of 2025, Allwyn have been considering options to enable safe technical cutover of the digital front end platform which has consequently pushed the end date of the project to 31/12/25.","narrativeClaimKind":null},{"id":"DCMS_0013_1819-Q3","year":2026,"name":"4th National Lottery Licence","department":"DCMS","category":"Government Transformation and Service Delivery","description":"The 4th National Lottery Competition Programme is responsible for ensuring the continuation of the National Lottery on the expiry of the 3rd Licence at the end of January 2024. This involved designing a new licence fit for the future and selecting an operator via a competitive application process who is able to continue to develop the National Lottery as a public asset in order to maximise the returns to good causes whilst also ensuring the highest standards of propriety and player protection.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25-Q4, NISTA's Delivery Confidence Assessment rating at 25/26-Q3 increased from RED to AMBER.This is primarily due to the following factors‚ during 25/26, Allwyn were able to successfully complete both Retail (RCO) and Digital Cutover (DCO) activities bringing the project in line with expected deadlines. Following AELs delivery of DCO in January 2026 the Programme increased from AMBER to GREEN (25/26-Q4).","startDate":"2018-11-16","endDate":"2026-05-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 increased from 31/12/2025 to 31/05/2026. This is primarily due to the following factors‚ Following Allwyn's Implementation Notice issued in November 2024, Fully Implemented Commencement was expected to be delivered by late 2025. Allwyn delivered digital cutover on the weekend of 24/25 January 2026 and the Commission's Board determined that they had delivered Fully Implemented Commencement on 19 March 2026. There are some final closure activities taking place between mid March and the end of May 2026 before the NISTA Gate 5a and Programme closure.","fyBaseline":16.9,"fyForecast":14.3,"fyVariance":15.42,"varianceNarrative":"Reliance on external legal and external consultants has reduced in 25/26 compared to budget, and has been reprofiled into 26/27. No impact on overall life cost.","wholeLifeCost":174.46,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 increased from £154.8m to £168.2m (£13.4m). This is primarily due to the following factors: • 4NLR budget was increased by £8.36m: o Delay to Full Implementation causing BAU an Implementation to run in parallel o aspects of regulation have proved more complex and therefore more resource intensive for Licensing than anticipated o Retention of additional roles that were once considered to be required for bedding in period only, with additional support around enforcement, finance, and stakeholder management/project delivery o Increased contingency primarily to account for situations where additional legal resources or external advice is needed. • Programme and Recoverable Implementation Costs (RICs) budget was increased by £5.02m , we are currently working within the FBC Scenario 2 resource and timeline (RICs completion forecast 31 Jan 27), scenarios 3 & 4 increase the Programme by c2 months each. The increase was required to accommodate Allwyn’s delay in testing and loss of contingency time and not being able to deliver Full Functionality by the Fall Back Delayed Date in Feb ‘25 Please note figures referenced in the narratives were entered as nominal and the system automatically converts them to Real Terms.","benefits":24230.06,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained the same as last year at 20643.","themes":["Cost & funding","Delivery & schedule","Technical & integration","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 24/25-Q4, NISTA's Delivery Confidence Assessment rating at 25/26-Q3 increased from RED to AMBER.This is primarily due to the following factors‚ during 25/26, Allwyn were able to successfully complete both Retail (RCO) and Digital Cutover (DCO) activities bringing the project in line with expected deadlines. Following AELs delivery…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 increased from 31/12/2025 to 31/05/2026. This is primarily due to the following factors‚ Following Allwyn's Implementation Notice issued in November 2024, Fully Implemented Commencement was expected to be delivered by late 2025. Allwyn delivered digital cutover on the weekend of 24/25 January 2026 and the Commission's Board determined that they had delivered Fully Implemented Commencement on 19 March 2026. There are some final closure activities taking place between mid March and the end of May 2026 before the NISTA Gate 5a and Programme closure.","narrativeClaimKind":null}],"previous":{"id":"DCMS_0013_1819-Q3","year":2025,"name":"4th National Lottery Licence","department":"DCMS","category":"Government Transformation and Service Delivery","description":"The 4th National Lottery Competition Programme is responsible for ensuring the continuation of the National Lottery on the expiry of the 3rd Licence at the end of January 2024. This involved designing a new licence fit for the future and selecting an operator via a competitive application process who is able to continue to develop the National Lottery as a public asset in order to maximise the returns to good causes whilst also ensuring the highest standards of propriety and player protection.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 decreased from AMBER to RED. This is primarily due to the following factors‚ In the latter half of the 24/25 year, Allwyn suffered increasing delays and setbacks with testing across its work streams. Without any contingency remaining in the plan, it became increasingly unlikely that Fully Implemented Commencement (FIC) would be achieved by the delayed date in February 2025. The Programme's Delivery Confidence Assessment was therefore downgraded from Amber to Red.","startDate":"2018-11-16","endDate":"2025-12-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 28/02/2025 to 31/12/2025. This is primarily due to the following factors‚ In November 2024, Allwyn issued an Implementation Issue Notice to formally notify the Commission that the Fully Implemented Commencement would not be achieved by February 2025 as expected. During the first half of 2025, Allwyn have been considering options to enable safe technical cutover of the digital front end platform which has consequently pushed the end date of the project to 31/12/25.","fyBaseline":17.0,"fyForecast":16.37,"fyVariance":3.71,"varianceNarrative":"The budget variance is less than or equal to 5%. n/a - less than 5%","wholeLifeCost":154.85,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 177 to 154. This is primarily due to the following factors‚ The 23/24 report incorrectly included £23m of litigation costs in the return. The litigation budget sits outside of the WLC for 4NL so the 24/25 return for WLC was reduced from £177m to £154m in line with the FBC.","benefits":20643.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 20643. This is primarily due to the following factors‚ There has been no change to the benefits","themes":["Cost & funding","Technical & integration","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 decreased from AMBER to RED. This is primarily due to the following factors‚ In the latter half of the 24/25 year, Allwyn suffered increasing delays and setbacks with testing across its work streams. Without any contingency remaining…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 28/02/2025 to 31/12/2025. This is primarily due to the following factors‚ In November 2024, Allwyn issued an Implementation Issue Notice to formally notify the Commission that the Fully Implemented Commencement would not be achieved by February 2025 as expected. During the first half of 2025, Allwyn have been considering options to enable safe technical cutover of the digital front end platform which has consequently pushed the end date of the project to 31/12/25.","narrativeClaimKind":null},"ratingDelta":-1,"transition":"Improved","endDateDeltaDays":151,"attentionScore":31,"attentionReasons":["Current published delivery confidence is Amber","Published end date moved 151 days later","In-year forecast variance is +15.4%"]},{"id":"MOJ_0058_2122-Q1","year":2026,"name":"Electronic Monitoring Expansion","department":"MOJ","category":"Government Transformation and Service Delivery","description":"The Electronic Monitoring Expansion Programme seeks to expand the impact, use and efficiency of electronic monitoring as a tool for the management of offenders in the community, helping reduce re-offending and protecting the public. The programme's aims include - effectively retendering the current service, increasing the scope and reach of electronic monitoring, building a more comprehensive evidence base, and more closely embedding the electronic monitoring service within the Probation service.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25-Q4, the NISTA Delivery Confidence Assessment (DCA) rating for 25/26-Q4 remains at Amber. This is primarily due to delays in migration to a new service requiring legacy contract extensions, with limited schedule contingency remaining.","startDate":"2021-01-01","endDate":"2026-06-15","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end date at 25/26-Q4 changed from 30/11/25 to 15/06/26.This is primarily due to delays in migration to a new service.","fyBaseline":145.46,"fyForecast":154.68,"fyVariance":6.34,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the increased costs of the contract extension within the financial year.","wholeLifeCost":1161.1,"costNarrative":"Compared to financial year 24/25-Q4, the project's Whole Life Costs at 25/26-Q4 increased from £857.610m to £1,161.10m. This is primarily due to an increased demand for Electronic Monitoring services being greater than the modelling that informed the original business case. All costs have been reported in 2024/25 base prices in line with NISTA requirements. This is a change from previous years where costs were reported in nominal prices. All costs reflect this accounting reduction regardless of any actual changes.","benefits":null,"benefitsNarrative":"The programme currently reports no monetised benefits. The project's benefits focus on the successful operation of Electronic Monitoring.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Technical & integration"],"evidenceExcerpt":"Compared to financial year 24/25-Q4, the NISTA Delivery Confidence Assessment (DCA) rating for 25/26-Q4 remains at Amber. This is primarily due to delays in migration to a new service requiring legacy contract extensions, with limited schedule contingency remaining. Compared to financial year 24/25-Q4, the programme's end date at 25/26-Q4 changed from…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the programme's end date at 25/26-Q4 changed from 30/11/25 to 15/06/26.This is primarily due to delays in migration to a new service.","narrativeClaimKind":null,"history":[{"id":"MOJ_0058_2122-Q1","year":2022,"name":"Electronic Monitoring Expansion","department":"MOJ","category":"Government Transformation and Service Delivery","description":"The Electronic Monitoring Expansion Programme seeks to expand the impact, use and efficacy of electronic monitoring as a tool for the management of offenders in the community, helping reduce reoffending and protecting the public. The programme's aims include - effectively retendering the current service, increasing the scope and reach of electronic monitoring, building a more comprehensive evidence base, and more closely aligning the electronic monitoring with the probation service.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 is Amber. This is the first time data has been published for this project, which has been added to GMPP over the last year. The DCA is Amber primarily due to the following factors: The timeframes for the delivery of the Future Service remain achievable but there is limited contingency. To date the project has delivered alcohol abstinence monitoring requirements for community sentences, alcohol monitoring on licence in wales, Acquisitive Crime location monitoring in 19 police forces, and Home Office Immigration Enforcement non-fitted devices.","startDate":"2021-01-01","endDate":"2024-12-31","scheduleNarrative":"Compared to 20/21 Q4, the project end date has remained static. Overall delivery across Electronic Monitoring Expansion continues to deliver at pace and the programme remains on track to complete within the timescale.","fyBaseline":73.86,"fyForecast":73.86,"fyVariance":0.0,"varianceNarrative":"The in year variance is below or equal to 5% so no narrative is required.","wholeLifeCost":1214.0,"costNarrative":"Your projects Baseline Whole Life Cost is 1213.62 (£m). This is primarily due to the following factors: Electronic Monitoring Expansion and Future Service costs are comprised of 3 elements: EM Live Service: The existing ongoing costs of running the EM Service. EM Expansion Programme: New one-off costs associated with the design and implementation of future waves of expansion projects, and where applicable New ongoing costs of running Expansion projects which are accepted into Live Service. EM Future Service: One-off costs to implement the EM 2024 re-procurement.","benefits":null,"benefitsNarrative":"","themes":["Delivery & schedule","Cost & funding","Commercial & supply chain","Scope & requirements"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 is Amber. This is the first time data has been published for this project, which has been added to GMPP over the last year. The DCA is Amber primarily due to the following factors: The timeframes for the delivery of the Future Service remain achievable but there is…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to 20/21 Q4, the project end date has remained static. Overall delivery across Electronic Monitoring Expansion continues to deliver at pace and the programme remains on track to complete within the timescale.","narrativeClaimKind":null},{"id":"MOJ_0058_2122-Q1","year":2023,"name":"Electronic Monitoring Expansion","department":"MOJ","category":"Government Transformation and Service Delivery","description":"The Electronic Monitoring Expansion Programme seeks to expand the impact, use and efficiency of electronic monitoring as a tool for the management of offenders in the community, helping reduce re-offending and protecting the public. The programme's aims include - effectively retendering the current service, increasing the scope and reach of electronic monitoring, building a more comprehensive evidence base, and more closely embedding the electronic monitoring service within the Probation service","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber (IPA rating). This is primarily due to the following factors. Compared to21/22 Q4, theproject'sDelivery Confidence Assessment rating remained Amber. The Amber assessment is due to timetable risks and recruitment challenges.A number of new initiatives to expand and enhance the current provision have been successfully delivered.","startDate":"2021-01-01","endDate":"2024-12-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2024-12-31. This is primarily due to the following factors. The programme is on track against the current baseline plan.","fyBaseline":162.66,"fyForecast":88.38,"fyVariance":-46.0,"varianceNarrative":"The underspend is due to delays with operational recruitment andcaseload being below forecast.","wholeLifeCost":1214.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 remained at 1214m. This is primarily due to the following factors. The Whole Life Cost has remained static, and the budget remains aligned to the current baseline business case.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This project currently reports no monetised benefits. The project's benefits will be defined monetarily at a later stage and following the completion of the procurement of new service delivery contracts and current pilot projects.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber (IPA rating). This is primarily due to the following factors. Compared to21/22 Q4, theproject'sDelivery Confidence Assessment rating remained Amber. The Amber assessment is due to timetable risks and recruitment challenges.A number of new initiatives…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2024-12-31. This is primarily due to the following factors. The programme is on track against the current baseline plan.","narrativeClaimKind":null},{"id":"MOJ_0058_2122-Q1","year":2024,"name":"Electronic Monitoring Expansion","department":"MOJ","category":"Government Transformation and Service Delivery","description":"The Electronic Monitoring Expansion Programme seeks to expand the impact, use and efficiency of electronic monitoring as a tool for the management of offenders in the community, helping reduce re-offending and protecting the public. The programme's aims include - effectively retendering the current service, increasing the scope and reach of electronic monitoring, building a more comprehensive evidence base, and more closely embedding the electronic monitoring service within the Probation Service.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. New contracts have been awarded, however there is limited mobilisation schedule contingency.","startDate":"2021-01-01","endDate":"2024-12-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2024-12-31. This is primarily due to the following factors. The project remains on track for completion in line with the current baseline schedule.","fyBaseline":117.67,"fyForecast":108.36,"fyVariance":-8.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The underspend is due to unspent Optimism Bias and reduced in-year activities requiring costs to be re-profiled into future years.","wholeLifeCost":858.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 decreased from 1214m. to 858m. This is primarily due to the following factors. The decrease is due to contract savings.","benefits":0.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 0m. This project currently reports no monetised benefits. The project's benefits are related to the successful operation of Electronic Monitoring.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. New contracts have been awarded, however there is limited mobilisation schedule contingency. Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2024-12-31. This is primarily due to the following factors. The project remains on track for completion in line with the current baseline schedule.","narrativeClaimKind":null},{"id":"MOJ_0058_2122-Q1","year":2025,"name":"Electronic Monitoring Expansion","department":"MoJ","category":"Government Transformation and Service Delivery","description":"The Electronic Monitoring Expansion Programme seeks to expand the impact, use and efficiency of electronic monitoring as a tool for the management of offenders in the community, helping reduce re-offending and protecting the public. The programme's aims include - effectively retendering the current service, increasing the scope and reach of electronic monitoring, building a more comprehensive evidence base, and more closely embedding the electronic monitoring service within the Probation Service.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The schedule has been re-baselined following supplier driven implementation delays, but there remain limited schedule contingency.","startDate":"2021-01-01","endDate":"2025-11-30","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/12/2024 to 30/11/2025. This is primarily due to the following factors‚ The schedule has been re-baselined following supplier driven implementation delays.","fyBaseline":131.4,"fyForecast":138.5,"fyVariance":5.4,"varianceNarrative":"The budget variance is inferior or equal to 5%.","wholeLifeCost":857.61,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remains the same at 858. This is primarily due to the following factors‚ The Whole Life Cost has remained static, and the budget remains aligned to the current baseline business case.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ The project currently reports no monetised benefits. The project's benefits focus on the successful operation of Electronic Monitoring.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The schedule has been re-baselined following supplier driven implementation delays, but there remain limited schedule contingency. Compared to financial year…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/12/2024 to 30/11/2025. This is primarily due to the following factors‚ The schedule has been re-baselined following supplier driven implementation delays.","narrativeClaimKind":null},{"id":"MOJ_0058_2122-Q1","year":2026,"name":"Electronic Monitoring Expansion","department":"MOJ","category":"Government Transformation and Service Delivery","description":"The Electronic Monitoring Expansion Programme seeks to expand the impact, use and efficiency of electronic monitoring as a tool for the management of offenders in the community, helping reduce re-offending and protecting the public. The programme's aims include - effectively retendering the current service, increasing the scope and reach of electronic monitoring, building a more comprehensive evidence base, and more closely embedding the electronic monitoring service within the Probation service.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25-Q4, the NISTA Delivery Confidence Assessment (DCA) rating for 25/26-Q4 remains at Amber. This is primarily due to delays in migration to a new service requiring legacy contract extensions, with limited schedule contingency remaining.","startDate":"2021-01-01","endDate":"2026-06-15","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end date at 25/26-Q4 changed from 30/11/25 to 15/06/26.This is primarily due to delays in migration to a new service.","fyBaseline":145.46,"fyForecast":154.68,"fyVariance":6.34,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the increased costs of the contract extension within the financial year.","wholeLifeCost":1161.1,"costNarrative":"Compared to financial year 24/25-Q4, the project's Whole Life Costs at 25/26-Q4 increased from £857.610m to £1,161.10m. This is primarily due to an increased demand for Electronic Monitoring services being greater than the modelling that informed the original business case. All costs have been reported in 2024/25 base prices in line with NISTA requirements. This is a change from previous years where costs were reported in nominal prices. All costs reflect this accounting reduction regardless of any actual changes.","benefits":null,"benefitsNarrative":"The programme currently reports no monetised benefits. The project's benefits focus on the successful operation of Electronic Monitoring.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Technical & integration"],"evidenceExcerpt":"Compared to financial year 24/25-Q4, the NISTA Delivery Confidence Assessment (DCA) rating for 25/26-Q4 remains at Amber. This is primarily due to delays in migration to a new service requiring legacy contract extensions, with limited schedule contingency remaining. Compared to financial year 24/25-Q4, the programme's end date at 25/26-Q4 changed from…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the programme's end date at 25/26-Q4 changed from 30/11/25 to 15/06/26.This is primarily due to delays in migration to a new service.","narrativeClaimKind":null}],"previous":{"id":"MOJ_0058_2122-Q1","year":2025,"name":"Electronic Monitoring Expansion","department":"MoJ","category":"Government Transformation and Service Delivery","description":"The Electronic Monitoring Expansion Programme seeks to expand the impact, use and efficiency of electronic monitoring as a tool for the management of offenders in the community, helping reduce re-offending and protecting the public. The programme's aims include - effectively retendering the current service, increasing the scope and reach of electronic monitoring, building a more comprehensive evidence base, and more closely embedding the electronic monitoring service within the Probation Service.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The schedule has been re-baselined following supplier driven implementation delays, but there remain limited schedule contingency.","startDate":"2021-01-01","endDate":"2025-11-30","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/12/2024 to 30/11/2025. This is primarily due to the following factors‚ The schedule has been re-baselined following supplier driven implementation delays.","fyBaseline":131.4,"fyForecast":138.5,"fyVariance":5.4,"varianceNarrative":"The budget variance is inferior or equal to 5%.","wholeLifeCost":857.61,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remains the same at 858. This is primarily due to the following factors‚ The Whole Life Cost has remained static, and the budget remains aligned to the current baseline business case.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ The project currently reports no monetised benefits. The project's benefits focus on the successful operation of Electronic Monitoring.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The schedule has been re-baselined following supplier driven implementation delays, but there remain limited schedule contingency. Compared to financial year…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/12/2024 to 30/11/2025. This is primarily due to the following factors‚ The schedule has been re-baselined following supplier driven implementation delays.","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":197,"attentionScore":31,"attentionReasons":["Current published delivery confidence is Amber","Published end date moved 197 days later","In-year forecast variance is +6.3%"]},{"id":"HMRC_0543_2526-Q2","year":2026,"name":"Enterprise Customer Relationship Management (eCRM)","department":"HMRC","category":"Government Transformation and Service Delivery","description":"ECRM will modernise how HMRC understands and supports customers by replacing fragmented legacy systems with a single enterprise CRM platform. This will give staff a complete view of customer interactions, enabling faster, more consistent resolution and simpler services for customers. ECRM will simplify how services are designed and delivered, reduce avoidable contact, strengthen compliance, and cut reliance on ageing systems. It establishes a long-term platform for continuous improvement, enabling HMRC to deliver fully joined-up services at scale.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The programme is moving from set-up into active delivery, with commercial activity well advanced and a multidisciplinary delivery model now in place. ECRM has established a single, integrated team focused on delivering priority use cases early, building confidence through real delivery and rapid learning. The focus is now on sustaining a consistent delivery rhythm—securing the core platform, sequencing delivery across services and ensuring business readiness so that capability is adopted and value is realised. This approach prioritises early outcomes while building the foundation for enterprise-wide transformation.","startDate":"2025-04-01","endDate":"2030-03-29","scheduleNarrative":"ECRM is a phased, multi-year transformation to establish a single core SaaS CRM platform across HMRC while maintaining stable services. Delivery is focused on priority services, enabling early capability to be deployed, tested and refined in live environments. Future phases will scale this approach across the organisation, shaped by procurement outcomes, delivery learning and the sequencing of dependencies across services and systems. This ensures early value is delivered while maintaining control of risk and service continuity.","fyBaseline":12.44,"fyForecast":7.98,"fyVariance":35.83,"varianceNarrative":"The budget variance exceeds 5%. This reflects the programme having only recently entered the end to end delivery lifecycle, when forecasts were necessarily high-level and based on early assumptions. As delivery plans matured, scope was defined in greater detail and commercial positions were firmed, including contracted activity and evidenced recharges. These changes resulted in a reduction to forecast costs and provide increased confidence that the outturn now reflects confirmed delivery intent rather than indicative early estimates.","wholeLifeCost":256.75,"costNarrative":"Whole Life Cost estimates remain indicative and will be refined as procurement concludes and the delivery roadmap matures. Costs reflect the scale of implementing a core CRM platform, delivering priority use cases and managing the phased transition from legacy systems. Investment is being agreed incrementally in tranches to maintain affordability, value for money and delivery control, with future commitments aligned to confirmed scope, commercial outcomes and demonstrated progress.","benefits":700.92,"benefitsNarrative":"ECRM will deliver direct benefits from early use cases and enabling benefits as the platform is adopted across services. Clear ownership and attribution are being established, with benefits recognised only where supported by delivery evidence and approved business cases. The benefits position will strengthen as delivery scales, adoption increases and legacy systems are retired. Realising full value depends on sustained business adoption alongside delivery of the core platform capability.","themes":["Delivery & schedule","Commercial & supply chain","Cost & funding","Scope & requirements"],"evidenceExcerpt":"The programme is moving from set-up into active delivery, with commercial activity well advanced and a multidisciplinary delivery model now in place. ECRM has established a single, integrated team focused on delivering priority use cases early, building confidence through real delivery and rapid learning. The focus is now on sustaining a consistent delivery…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"ECRM is a phased, multi-year transformation to establish a single core SaaS CRM platform across HMRC while maintaining stable services. Delivery is focused on priority services, enabling early capability to be deployed, tested and refined in live environments. Future phases will scale this approach across the organisation, shaped by procurement outcomes, delivery learning and the sequencing of dependencies across services and systems. This ensures early value is delivered while maintaining control of risk and service continuity.","narrativeClaimKind":null,"history":[{"id":"HMRC_0543_2526-Q2","year":2026,"name":"Enterprise Customer Relationship Management (eCRM)","department":"HMRC","category":"Government Transformation and Service Delivery","description":"ECRM will modernise how HMRC understands and supports customers by replacing fragmented legacy systems with a single enterprise CRM platform. This will give staff a complete view of customer interactions, enabling faster, more consistent resolution and simpler services for customers. ECRM will simplify how services are designed and delivered, reduce avoidable contact, strengthen compliance, and cut reliance on ageing systems. It establishes a long-term platform for continuous improvement, enabling HMRC to deliver fully joined-up services at scale.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The programme is moving from set-up into active delivery, with commercial activity well advanced and a multidisciplinary delivery model now in place. ECRM has established a single, integrated team focused on delivering priority use cases early, building confidence through real delivery and rapid learning. The focus is now on sustaining a consistent delivery rhythm—securing the core platform, sequencing delivery across services and ensuring business readiness so that capability is adopted and value is realised. This approach prioritises early outcomes while building the foundation for enterprise-wide transformation.","startDate":"2025-04-01","endDate":"2030-03-29","scheduleNarrative":"ECRM is a phased, multi-year transformation to establish a single core SaaS CRM platform across HMRC while maintaining stable services. Delivery is focused on priority services, enabling early capability to be deployed, tested and refined in live environments. Future phases will scale this approach across the organisation, shaped by procurement outcomes, delivery learning and the sequencing of dependencies across services and systems. This ensures early value is delivered while maintaining control of risk and service continuity.","fyBaseline":12.44,"fyForecast":7.98,"fyVariance":35.83,"varianceNarrative":"The budget variance exceeds 5%. This reflects the programme having only recently entered the end to end delivery lifecycle, when forecasts were necessarily high-level and based on early assumptions. As delivery plans matured, scope was defined in greater detail and commercial positions were firmed, including contracted activity and evidenced recharges. These changes resulted in a reduction to forecast costs and provide increased confidence that the outturn now reflects confirmed delivery intent rather than indicative early estimates.","wholeLifeCost":256.75,"costNarrative":"Whole Life Cost estimates remain indicative and will be refined as procurement concludes and the delivery roadmap matures. Costs reflect the scale of implementing a core CRM platform, delivering priority use cases and managing the phased transition from legacy systems. Investment is being agreed incrementally in tranches to maintain affordability, value for money and delivery control, with future commitments aligned to confirmed scope, commercial outcomes and demonstrated progress.","benefits":700.92,"benefitsNarrative":"ECRM will deliver direct benefits from early use cases and enabling benefits as the platform is adopted across services. Clear ownership and attribution are being established, with benefits recognised only where supported by delivery evidence and approved business cases. The benefits position will strengthen as delivery scales, adoption increases and legacy systems are retired. Realising full value depends on sustained business adoption alongside delivery of the core platform capability.","themes":["Delivery & schedule","Commercial & supply chain","Cost & funding","Scope & requirements"],"evidenceExcerpt":"The programme is moving from set-up into active delivery, with commercial activity well advanced and a multidisciplinary delivery model now in place. ECRM has established a single, integrated team focused on delivering priority use cases early, building confidence through real delivery and rapid learning. The focus is now on sustaining a consistent delivery…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"ECRM is a phased, multi-year transformation to establish a single core SaaS CRM platform across HMRC while maintaining stable services. Delivery is focused on priority services, enabling early capability to be deployed, tested and refined in live environments. Future phases will scale this approach across the organisation, shaped by procurement outcomes, delivery learning and the sequencing of dependencies across services and systems. This ensures early value is delivered while maintaining control of risk and service continuity.","narrativeClaimKind":null}],"previous":null,"ratingDelta":null,"transition":"Not comparable","endDateDeltaDays":null,"attentionScore":30,"attentionReasons":["Current published delivery confidence is Amber","In-year forecast variance is +35.8%"]},{"id":"MOD_0136_2122-Q1","year":2026,"name":"NAVAL SUPPORT INTEGRATED GLOBAL NETWORK (NSIGN)","department":"MOD","category":"Military Capability","description":"The Naval Support Integrated Global Network (NSIGN) is the re-provision of the services contracted through Future Maritime Support Programme, specifically Ship and Submarine engineering and key Naval Base enablers. NSIGN consists of 3 projects, Ships Support, Submarine Support and Naval Bases. Whilst NSIGN will continue to develop the market facing transformation (a combination of single source and competition) it will also utilise Defence frameworks wherever possible, expand the scope for Ships to include non-complex, provide choice for how the Royal Navy will operate in the future, and look at project scope boundaries/opportunities where NSIGN could deliver more effectively.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25-Q4, the NISTA/SRO Delivery Confidence Assessment rating at 25/26-Q4 remained at Amber. This is primarily due to the following factors. 1. The NSIGN Programme is rated Amber to reflect that it is delivering progress across all three Projects through the concept and assessment phases, while continuing to face a small number of significant and interrelated challenges. 2. Progress to date demonstrates a clear strategic direction, increased maturity of user requirements and options, and improved Programme level understanding of dependencies, risks and affordability drivers across the Ships, Submarines and Naval Bases Projects. 3. On going uncertainty on publication of the Defence Investment Plan creates constraints on long term affordability, limiting the Programme’s ability to fully de-risk subsequent delivery stages at this point.","startDate":"2021-12-01","endDate":"2029-12-29","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 22/03/2030. This is primarily due to the following factors. 1. The baseline of the programme and the Integrated Programme Schedules support the deliverability assessment, but timelines remain challenging to contract award with programmes meeting either the current Future Maritime Support Programme expiry dates for planned Future Martime Support Programme extensions (in 2026 and 2028). 2. The active close management of Future Maritime Support Programme Extensions alongside the NSIGN activity are key to mitigating the risks to continuity of service delivery.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Due to the combined nature of the cost model (Submarine, Ships and Naval Base) the figures are not currently available to calculate the In Year variance. Figures will be available once the next business case aligns the elements. Remains within the planned expenditure, noting that Concept Phase activity is confined to Departmental Operating and Legal Costs.","wholeLifeCost":14352.16,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) decreased from £20264.02M to £17000.81M. This is primarily due to the following factors. 1. Programme level Cost Modelling will be finalised on publication of the Defence Investment Plan. 2. The current marginal (<1%) whole life affordability challenge (against a total assessed expenditure of £20bn over 10 years) will be resolved through further cost-modelling and challenge prior to the the NSIGN Ships Invitation to Negotiate (as part of the Outline Business Case approval and Naval Base Outline Business Case and NSIGN Subs Full Business Case in Quarter 1 26/27).","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. NSIGN has a clear benefits strategy focussed on improving availability of assets to support defence outcomes. Benefits plans and profiles continue to mature inline with Outline Business Case and Full Business Case submission timelines.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 24/25-Q4, the NISTA/SRO Delivery Confidence Assessment rating at 25/26-Q4 remained at Amber. This is primarily due to the following factors. 1. The NSIGN Programme is rated Amber to reflect that it is delivering progress across all three Projects through the concept and assessment phases, while continuing to face a small number of…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":true,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 22/03/2030. This is primarily due to the following factors. 1. The baseline of the programme and the Integrated Programme Schedules support the deliverability assessment, but timelines remain challenging to contract award with programmes meeting either the current Future Maritime Support Programme expiry dates for planned Future Martime Support Programme extensions (in 2026 and 2028). 2. The active close management of Future Maritime Support Programme Extensions alongside the NSIGN activity are key to mitigating the risks to continuity of service delivery.","narrativeClaimKind":"date-mismatch","history":[{"id":"MOD_0136_2122-Q1","year":2022,"name":"Naval Support Integrated Global Network (NSIGN)","department":"MOD","category":"Military Capability","description":"The Naval Support Integrated Global Network Programme will deliver Engineering and Equipment Support to Naval Platforms in the Maritime Domain on expiry of the Future Maritime Support Programme. It is a component programme of the Naval Enterprise Support Strategy Portfolio.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure and Project Authority's Delivery Confidence Assessment rating is Amber. This is primarily due to the following factors: Delays to Programme Initiation and availability of Suitably Qualified and Experienced People resource. The outlook is improving as resource is released from the Future Maritime Support Programme that is at the Full Operating Capability transition phase.","startDate":"2021-12-01","endDate":"2026-10-01","scheduleNarrative":"The project end-date is 01 October 2026. This is primarily due to the following factors: The schedule not yet established, the programme is yet to reach Strategic Outline Case.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"The GMPP project did not provide data","wholeLifeCost":null,"costNarrative":"The programme is yet to reach Strategic Outline Case.","benefits":null,"benefitsNarrative":"","themes":["Workforce & capability","Delivery & schedule","Technical & integration"],"evidenceExcerpt":"The Infrastructure and Project Authority's Delivery Confidence Assessment rating is Amber. This is primarily due to the following factors: Delays to Programme Initiation and availability of Suitably Qualified and Experienced People resource. The outlook is improving as resource is released from the Future Maritime Support Programme that is at the Full…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project end-date is 01 October 2026. This is primarily due to the following factors: The schedule not yet established, the programme is yet to reach Strategic Outline Case.","narrativeClaimKind":null},{"id":"MOD_0136_2122-Q1","year":2023,"name":"Naval Support Integrated Global Network (NSIGN)","department":"MOD","category":"Military Capability","description":"The Naval Support Integrated Global Network is the re-provision of the services contracted through Future Maritime Support Programme. Whilst Naval Support Integrated Global Network will continue to develop the market facing transformation (a combination of single source and competition) it will also utilise Defence frameworks wherever possible, expand the scope for Ships to align the complex and non-complex, provide choice for how the Royal Navy will operate in the future, and look at scope boundaries/opportunities where Naval Support Integrated Global Network could deliver more effectively.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. Early challenges with Programme initiation, resourcing and mobilisation. An Action Plan is in place which will ensure alignment of key stakeholders to the strategic narrative and industrial strategy.","startDate":"2021-12-01","endDate":"2029-05-22","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 increased from 2026-10-01 to 2029-05-22. This is primarily due to the following factors. The programme is in the pre-concept phase. Key Procurement and Commercial Strategy milestones and the Naval Support Integrated Global Network mobilisation plans will continue to mature as the Programme progresses through Strategic Outline Case, Outline Business Case before being aligned with Full Operating Capability within the Full Business Case.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"","wholeLifeCost":null,"costNarrative":"NA The Programme is yet to reach Outline Business Case.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This programme does not report cashable benefits. Its aim is to provision the armed forces with the equipment and / or infrastructure required.","themes":["Approvals & decisions","Commercial & supply chain","Cost & funding","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. Early challenges with Programme initiation, resourcing and mobilisation. An Action Plan is in place which will ensure alignment of key stakeholders to the strategic…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 increased from 2026-10-01 to 2029-05-22. This is primarily due to the following factors. The programme is in the pre-concept phase. Key Procurement and Commercial Strategy milestones and the Naval Support Integrated Global Network mobilisation plans will continue to mature as the Programme progresses through Strategic Outline Case, Outline Business Case before being aligned with Full Operating Capability within the Full Business Case.","narrativeClaimKind":null},{"id":"MOD_0136_2122-Q1","year":2024,"name":"Naval Support Integrated Global Network (NSIGN)","department":"MOD","category":"Military Capability","description":"The Naval Support Integrated Global Network is the re-provision of the services contracted through Future Maritime Support Programme. Whilst The Naval Support Integrated Global Network will continue to develop the market facing transformation (a combination of single source and competition) it will also utilise Defence frameworks wherever possible, expand the scope for Ships to align the complex and non-complex, provide choice for how the Royal Navy will operate in the future and look at scope boundaries/opportunities where The Naval Support Integrated Global Network could deliver more effectively. The Strategic Outline Case was approved in March 2024 and the Programme is now in the Concept Phase.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. This reflects the significant progress made by the Programme through the difficult early phase of mobilisation and accurately reflects the challenges of mobilisation, scope definition, solution design and alignment.","startDate":"2021-12-01","endDate":"2030-03-22","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 increased from 2029-03-22 to 2029-09-25. This is primarily due to the following factors. Changes in key milestones reflect the delay on transition to the Concept Phase, as a result of a protracted Strategic Outline Case approval and the reality of a Programme early in the scoping and solution design phase.","fyBaseline":null,"fyForecast":null,"fyVariance":0.0,"varianceNarrative":"With scope and solution design still to be finalised in May 2024, the full cost model and analysis of affordability has not been completed.","wholeLifeCost":null,"costNarrative":"With scope and solution design still to be finalised in May 2024, the full cost model and analysis of affordability has not been completed.","benefits":0.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 0m.","themes":["Scope & requirements","Cost & funding","Delivery & schedule","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. This reflects the significant progress made by the Programme through the difficult early phase of mobilisation and accurately reflects the challenges of mobilisation, scope…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 increased from 2029-03-22 to 2029-09-25. This is primarily due to the following factors. Changes in key milestones reflect the delay on transition to the Concept Phase, as a result of a protracted Strategic Outline Case approval and the reality of a Programme early in the scoping and solution design phase.","narrativeClaimKind":null},{"id":"MOD_0136_2122-Q1","year":2025,"name":"NAVAL SUPPORT INTEGRATED GLOBAL NETWORK (NSIGN)","department":"MoD","category":"Military Capability","description":"The Naval Support Integrated Global Network (NSIGN) is the re-provision of the services contracted through Future Maritime Support Programme, specifically Ship and Submarine engineering and key Naval Base enablers. NSIGN consists of 3 projects – Ships Support, Submarine Support and Naval Bases. Whilst NSIGN will continue to develop the market facing transformation (a combination of single source and competition) it will also utilise Defence frameworks wherever possible, expand the scope for Ships to align the complex and non-complex, provide choice for how the Royal Navy will operate in the future, and look at scope boundaries/opportunities where NSIGN could deliver more effectively.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. Following an Assurance Review concluding Red in July 2024 the Programme and Projects have progressed significantly with a subsequent NISTA Assurance Review upgrading Delivery Confidence to Amber, reflecting the significant progress with the maturity of the NSIGN (Submarines) Outline Business Case and the commercial strategy. The programme has made considerable progress, mobilising projects, progressing with project procurement and commercial strategies.","startDate":"2022-09-01","endDate":"2030-03-22","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 22/03/2030. This is primarily due to the following factors. The baseline of the Project and the Integrated Programme Schedules support the deliverability assessment, but timelines remain challenging to contract award with Projects meeting either the current Future Maritime Support Programme (FMSP) expiry dates (in 2026) or the revised expiry dates for the planned extensions (for the period 2026-2028). The active close management of FMSP Extensions alongside the NSIGN activity are key to mitigating the risks to continuity of service delivery.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Due to the combined nature of the cost model (Submarine, Ships and Naval Base) the figures are not currently available to calculate the In Year variance. Figures will be available once the next business case aligns the elements. Remains within the planned expenditure, noting that Concept Phase activity is confined to Departmental Operating and Legal Costs.","wholeLifeCost":20264.02,"costNarrative":"The project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) is 20264. This is primarily due to the following factors. Work is ongoing as part of the current concept phase activity to finalise the Programme Cost Model. A full affordability assessment will be made once the Spending Review has concluded. The current marginal (<1%) whole life affordability challenge (against a total assessed expenditure of £20bn over 10 years) will be resolved through further cost-modelling and challenge prior to the submission of the Naval Support Integrated Global Network (NSIGN) Ships and Naval Base Outline Business Case's and NSIGN Subs Full Business Case in Q3 25/26.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Commercial & supply chain","Approvals & decisions","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. Following an Assurance Review concluding Red in July 2024 the Programme and Projects have progressed significantly with a subsequent NISTA Assurance Review upgrading Delivery Confidence to Amber,…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 22/03/2030. This is primarily due to the following factors. The baseline of the Project and the Integrated Programme Schedules support the deliverability assessment, but timelines remain challenging to contract award with Projects meeting either the current Future Maritime Support Programme (FMSP) expiry dates (in 2026) or the revised expiry dates for the planned extensions (for the period 2026-2028). The active close management of FMSP Extensions alongside the NSIGN activity are key to mitigating the risks to continuity of service delivery.","narrativeClaimKind":null},{"id":"MOD_0136_2122-Q1","year":2026,"name":"NAVAL SUPPORT INTEGRATED GLOBAL NETWORK (NSIGN)","department":"MOD","category":"Military Capability","description":"The Naval Support Integrated Global Network (NSIGN) is the re-provision of the services contracted through Future Maritime Support Programme, specifically Ship and Submarine engineering and key Naval Base enablers. NSIGN consists of 3 projects, Ships Support, Submarine Support and Naval Bases. Whilst NSIGN will continue to develop the market facing transformation (a combination of single source and competition) it will also utilise Defence frameworks wherever possible, expand the scope for Ships to include non-complex, provide choice for how the Royal Navy will operate in the future, and look at project scope boundaries/opportunities where NSIGN could deliver more effectively.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25-Q4, the NISTA/SRO Delivery Confidence Assessment rating at 25/26-Q4 remained at Amber. This is primarily due to the following factors. 1. The NSIGN Programme is rated Amber to reflect that it is delivering progress across all three Projects through the concept and assessment phases, while continuing to face a small number of significant and interrelated challenges. 2. Progress to date demonstrates a clear strategic direction, increased maturity of user requirements and options, and improved Programme level understanding of dependencies, risks and affordability drivers across the Ships, Submarines and Naval Bases Projects. 3. On going uncertainty on publication of the Defence Investment Plan creates constraints on long term affordability, limiting the Programme’s ability to fully de-risk subsequent delivery stages at this point.","startDate":"2021-12-01","endDate":"2029-12-29","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 22/03/2030. This is primarily due to the following factors. 1. The baseline of the programme and the Integrated Programme Schedules support the deliverability assessment, but timelines remain challenging to contract award with programmes meeting either the current Future Maritime Support Programme expiry dates for planned Future Martime Support Programme extensions (in 2026 and 2028). 2. The active close management of Future Maritime Support Programme Extensions alongside the NSIGN activity are key to mitigating the risks to continuity of service delivery.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Due to the combined nature of the cost model (Submarine, Ships and Naval Base) the figures are not currently available to calculate the In Year variance. Figures will be available once the next business case aligns the elements. Remains within the planned expenditure, noting that Concept Phase activity is confined to Departmental Operating and Legal Costs.","wholeLifeCost":14352.16,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) decreased from £20264.02M to £17000.81M. This is primarily due to the following factors. 1. Programme level Cost Modelling will be finalised on publication of the Defence Investment Plan. 2. The current marginal (<1%) whole life affordability challenge (against a total assessed expenditure of £20bn over 10 years) will be resolved through further cost-modelling and challenge prior to the the NSIGN Ships Invitation to Negotiate (as part of the Outline Business Case approval and Naval Base Outline Business Case and NSIGN Subs Full Business Case in Quarter 1 26/27).","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. NSIGN has a clear benefits strategy focussed on improving availability of assets to support defence outcomes. Benefits plans and profiles continue to mature inline with Outline Business Case and Full Business Case submission timelines.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 24/25-Q4, the NISTA/SRO Delivery Confidence Assessment rating at 25/26-Q4 remained at Amber. This is primarily due to the following factors. 1. The NSIGN Programme is rated Amber to reflect that it is delivering progress across all three Projects through the concept and assessment phases, while continuing to face a small number of…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":true,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 22/03/2030. This is primarily due to the following factors. 1. The baseline of the programme and the Integrated Programme Schedules support the deliverability assessment, but timelines remain challenging to contract award with programmes meeting either the current Future Maritime Support Programme expiry dates for planned Future Martime Support Programme extensions (in 2026 and 2028). 2. The active close management of Future Maritime Support Programme Extensions alongside the NSIGN activity are key to mitigating the risks to continuity of service delivery.","narrativeClaimKind":"date-mismatch"}],"previous":{"id":"MOD_0136_2122-Q1","year":2025,"name":"NAVAL SUPPORT INTEGRATED GLOBAL NETWORK (NSIGN)","department":"MoD","category":"Military Capability","description":"The Naval Support Integrated Global Network (NSIGN) is the re-provision of the services contracted through Future Maritime Support Programme, specifically Ship and Submarine engineering and key Naval Base enablers. NSIGN consists of 3 projects – Ships Support, Submarine Support and Naval Bases. Whilst NSIGN will continue to develop the market facing transformation (a combination of single source and competition) it will also utilise Defence frameworks wherever possible, expand the scope for Ships to align the complex and non-complex, provide choice for how the Royal Navy will operate in the future, and look at scope boundaries/opportunities where NSIGN could deliver more effectively.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. Following an Assurance Review concluding Red in July 2024 the Programme and Projects have progressed significantly with a subsequent NISTA Assurance Review upgrading Delivery Confidence to Amber, reflecting the significant progress with the maturity of the NSIGN (Submarines) Outline Business Case and the commercial strategy. The programme has made considerable progress, mobilising projects, progressing with project procurement and commercial strategies.","startDate":"2022-09-01","endDate":"2030-03-22","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 22/03/2030. This is primarily due to the following factors. The baseline of the Project and the Integrated Programme Schedules support the deliverability assessment, but timelines remain challenging to contract award with Projects meeting either the current Future Maritime Support Programme (FMSP) expiry dates (in 2026) or the revised expiry dates for the planned extensions (for the period 2026-2028). The active close management of FMSP Extensions alongside the NSIGN activity are key to mitigating the risks to continuity of service delivery.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Due to the combined nature of the cost model (Submarine, Ships and Naval Base) the figures are not currently available to calculate the In Year variance. Figures will be available once the next business case aligns the elements. Remains within the planned expenditure, noting that Concept Phase activity is confined to Departmental Operating and Legal Costs.","wholeLifeCost":20264.02,"costNarrative":"The project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) is 20264. This is primarily due to the following factors. Work is ongoing as part of the current concept phase activity to finalise the Programme Cost Model. A full affordability assessment will be made once the Spending Review has concluded. The current marginal (<1%) whole life affordability challenge (against a total assessed expenditure of £20bn over 10 years) will be resolved through further cost-modelling and challenge prior to the submission of the Naval Support Integrated Global Network (NSIGN) Ships and Naval Base Outline Business Case's and NSIGN Subs Full Business Case in Q3 25/26.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Commercial & supply chain","Approvals & decisions","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. Following an Assurance Review concluding Red in July 2024 the Programme and Projects have progressed significantly with a subsequent NISTA Assurance Review upgrading Delivery Confidence to Amber,…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 22/03/2030. This is primarily due to the following factors. The baseline of the Project and the Integrated Programme Schedules support the deliverability assessment, but timelines remain challenging to contract award with Projects meeting either the current Future Maritime Support Programme (FMSP) expiry dates (in 2026) or the revised expiry dates for the planned extensions (for the period 2026-2028). The active close management of FMSP Extensions alongside the NSIGN activity are key to mitigating the risks to continuity of service delivery.","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":-83,"attentionScore":30,"attentionReasons":["Published commentary says the end date is unchanged while the published date moved","Current published delivery confidence is Amber"]},{"id":"DESNZ_0471_2425-Q4","year":2026,"name":"Warm Homes: Local Grant","department":"DESNZ","category":"Infrastructure and Construction","description":"The Warm Homes: Local Grant (WH:LG) scheme is a government-funded, fuel poverty scheme delivered by Local Authorities. It was launched on 23 September 2024, and was allocated £500m through the Chancellor’s Budget on 30 October 2024 to be delivered from April 2025 to March 2028, with a portion of this funding delivered through devolution deals with mayoral combined authorities. This £500m funding is part of a wider package towards heat decarbonisation and household energy efficiency over the next three years, including funding to support fuel poverty schemes including WH:LG, helping in total around 225,000 households to reduce their energy bills by over £200. The £500m allocated to WH:LG provides grants to private, low-income households living in the worst performing (EPC bands D-G) homes in England to tackle fuel poverty and progress net zero 2050. The primary and secondary aims of WH:LG are: 1. To deliver progress towards the statutory fuel poverty target for England, by improving as many fuel-poor homes as reasonably practicable to energy efficiency rating of Band C by 2030, 2. To deliver progress towards Net Zero 2050, and the Carbon Budgets, by installing energy performance upgrades and low carbon heating in homes that drive carbon abatement.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Warm Homes: Local Grant (WH:LG) scheme delivered its 2025/26 budget and exceeded the budget and delivery through other financial mechanisms, by approximately 30%. Early data suggests Grant Recipients are on track to comply with key scheme value for money protections, such as cost caps and measure price limits. To note, while this is a positive early indicator that progress against the total scheme objectives is on track (reducing fuel poverty and saving carbon), benefits data on these objectives is not yet available. There are risks regarding scheme resourcing which are being actively managed, and as a result the delivery confidence has been set as Amber for Quarter 4 of Financial Year 2025/26.","startDate":"2024-09-05","endDate":"2028-09-01","scheduleNarrative":"In accordance to the Full Business Case, the Warm Homes: Local Grant scheme was launched on 23 September 2024, and was allocated £500m through the Chancellor’s Budget on 30 October 2024 to be delivered from April 2025 to March 2028. The schedule of delivery has not changed since the launch of the scheme and it remains on track to deliver.","fyBaseline":80.4,"fyForecast":110.42,"fyVariance":37.35,"varianceNarrative":"The budget variance exceeds 5%. This is due to an increase to the CDEL cost forecast, specifically CDEL grant funding. All other CDEL and RDEL cost forecasts are in line with the baseline. The CDEL grant funding forecast has risen in response to demand from Grant Recipients and as a result, WHLG has been able to increase the value of CDEL grant funding disbursed to Grant Recipients in 25/26, above the value of the baseline.","wholeLifeCost":454.52,"costNarrative":"In accordance with the Full Business Case, the Warm Homes: Local Grant scheme Whole Life Cost consists of CDEL (capital) grant funding disbursed to Grant Recipients for the delivery of energy efficiency measures, CDEL (capital) enabling costs associated with the delivery of those energy efficiency assets (including digital and delivery partner support), RDEL programme costs associated with front line project delivery, including evaluation and RDEL admin costs associated with staffing.","benefits":1068.55,"benefitsNarrative":"The baseline benefits have been quantified in accordance with the Full Business Case for the Warm Homes: Local Grant scheme. Baseline benefits consist of monetised energy savings (using long-run variable costs of energy supply values), carbon savings (traded and non-traded), air quality benefits, comfort benefits and health benefits.","themes":["Cost & funding","Delivery & schedule","Technical & integration","Approvals & decisions"],"evidenceExcerpt":"The Warm Homes: Local Grant (WH:LG) scheme delivered its 2025/26 budget and exceeded the budget and delivery through other financial mechanisms, by approximately 30%. Early data suggests Grant Recipients are on track to comply with key scheme value for money protections, such as cost caps and measure price limits. To note, while this is a positive early…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"In accordance to the Full Business Case, the Warm Homes: Local Grant scheme was launched on 23 September 2024, and was allocated £500m through the Chancellor’s Budget on 30 October 2024 to be delivered from April 2025 to March 2028. The schedule of delivery has not changed since the launch of the scheme and it remains on track to deliver.","narrativeClaimKind":null,"history":[{"id":"DESNZ_0471_2425-Q4","year":2025,"name":"Warm Homes: Local Grant","department":"DESNZ","category":"ICT","description":"Warm Homes: Local Grant provides grants for energy performance measures and low carbon heating to privately owned, low-income households living in EPC band D-G homes in England to tackle fuel poverty and deliver progress towards Net Zero 2050 and the Carbon Budgets. £500 million was allocated to the scheme in the 2024 Autumn Budget to be delivered by Local Authorities from April 2025 to March 2028. WH:LG has funded 74 projects involving 271 local authorities (97% of eligible local authorities) across England. An Expression of Interest window ran from 16th October 2024 to 1st December 2024, with around £1.7bn of funding requested by Local Authorities.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Section 43 - Commercial interests","startDate":"2024-09-05","endDate":"2028-09-01","scheduleNarrative":"Section 43 - Commercial interests","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 43 - Commercial interests","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Section 43 - Commercial interests","themes":["Commercial & supply chain"],"evidenceExcerpt":"Section 43 - Commercial interests Section 43 - Commercial interests","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Section 43 - Commercial interests","narrativeClaimKind":null},{"id":"DESNZ_0471_2425-Q4","year":2026,"name":"Warm Homes: Local Grant","department":"DESNZ","category":"Infrastructure and Construction","description":"The Warm Homes: Local Grant (WH:LG) scheme is a government-funded, fuel poverty scheme delivered by Local Authorities. It was launched on 23 September 2024, and was allocated £500m through the Chancellor’s Budget on 30 October 2024 to be delivered from April 2025 to March 2028, with a portion of this funding delivered through devolution deals with mayoral combined authorities. This £500m funding is part of a wider package towards heat decarbonisation and household energy efficiency over the next three years, including funding to support fuel poverty schemes including WH:LG, helping in total around 225,000 households to reduce their energy bills by over £200. The £500m allocated to WH:LG provides grants to private, low-income households living in the worst performing (EPC bands D-G) homes in England to tackle fuel poverty and progress net zero 2050. The primary and secondary aims of WH:LG are: 1. To deliver progress towards the statutory fuel poverty target for England, by improving as many fuel-poor homes as reasonably practicable to energy efficiency rating of Band C by 2030, 2. To deliver progress towards Net Zero 2050, and the Carbon Budgets, by installing energy performance upgrades and low carbon heating in homes that drive carbon abatement.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Warm Homes: Local Grant (WH:LG) scheme delivered its 2025/26 budget and exceeded the budget and delivery through other financial mechanisms, by approximately 30%. Early data suggests Grant Recipients are on track to comply with key scheme value for money protections, such as cost caps and measure price limits. To note, while this is a positive early indicator that progress against the total scheme objectives is on track (reducing fuel poverty and saving carbon), benefits data on these objectives is not yet available. There are risks regarding scheme resourcing which are being actively managed, and as a result the delivery confidence has been set as Amber for Quarter 4 of Financial Year 2025/26.","startDate":"2024-09-05","endDate":"2028-09-01","scheduleNarrative":"In accordance to the Full Business Case, the Warm Homes: Local Grant scheme was launched on 23 September 2024, and was allocated £500m through the Chancellor’s Budget on 30 October 2024 to be delivered from April 2025 to March 2028. The schedule of delivery has not changed since the launch of the scheme and it remains on track to deliver.","fyBaseline":80.4,"fyForecast":110.42,"fyVariance":37.35,"varianceNarrative":"The budget variance exceeds 5%. This is due to an increase to the CDEL cost forecast, specifically CDEL grant funding. All other CDEL and RDEL cost forecasts are in line with the baseline. The CDEL grant funding forecast has risen in response to demand from Grant Recipients and as a result, WHLG has been able to increase the value of CDEL grant funding disbursed to Grant Recipients in 25/26, above the value of the baseline.","wholeLifeCost":454.52,"costNarrative":"In accordance with the Full Business Case, the Warm Homes: Local Grant scheme Whole Life Cost consists of CDEL (capital) grant funding disbursed to Grant Recipients for the delivery of energy efficiency measures, CDEL (capital) enabling costs associated with the delivery of those energy efficiency assets (including digital and delivery partner support), RDEL programme costs associated with front line project delivery, including evaluation and RDEL admin costs associated with staffing.","benefits":1068.55,"benefitsNarrative":"The baseline benefits have been quantified in accordance with the Full Business Case for the Warm Homes: Local Grant scheme. Baseline benefits consist of monetised energy savings (using long-run variable costs of energy supply values), carbon savings (traded and non-traded), air quality benefits, comfort benefits and health benefits.","themes":["Cost & funding","Delivery & schedule","Technical & integration","Approvals & decisions"],"evidenceExcerpt":"The Warm Homes: Local Grant (WH:LG) scheme delivered its 2025/26 budget and exceeded the budget and delivery through other financial mechanisms, by approximately 30%. Early data suggests Grant Recipients are on track to comply with key scheme value for money protections, such as cost caps and measure price limits. To note, while this is a positive early…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"In accordance to the Full Business Case, the Warm Homes: Local Grant scheme was launched on 23 September 2024, and was allocated £500m through the Chancellor’s Budget on 30 October 2024 to be delivered from April 2025 to March 2028. The schedule of delivery has not changed since the launch of the scheme and it remains on track to deliver.","narrativeClaimKind":null}],"previous":{"id":"DESNZ_0471_2425-Q4","year":2025,"name":"Warm Homes: Local Grant","department":"DESNZ","category":"ICT","description":"Warm Homes: Local Grant provides grants for energy performance measures and low carbon heating to privately owned, low-income households living in EPC band D-G homes in England to tackle fuel poverty and deliver progress towards Net Zero 2050 and the Carbon Budgets. £500 million was allocated to the scheme in the 2024 Autumn Budget to be delivered by Local Authorities from April 2025 to March 2028. WH:LG has funded 74 projects involving 271 local authorities (97% of eligible local authorities) across England. An Expression of Interest window ran from 16th October 2024 to 1st December 2024, with around £1.7bn of funding requested by Local Authorities.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Section 43 - Commercial interests","startDate":"2024-09-05","endDate":"2028-09-01","scheduleNarrative":"Section 43 - Commercial interests","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 43 - Commercial interests","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Section 43 - Commercial interests","themes":["Commercial & supply chain"],"evidenceExcerpt":"Section 43 - Commercial interests Section 43 - Commercial interests","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Section 43 - Commercial interests","narrativeClaimKind":null},"ratingDelta":null,"transition":"Not comparable","endDateDeltaDays":0,"attentionScore":30,"attentionReasons":["Current published delivery confidence is Amber","In-year forecast variance is +37.4%"]},{"id":"DEFRA_0587_2526-Q3","year":2026,"name":"EU Delivery Programme","department":"DEFRA","category":"Government Transformation and Service Delivery","description":"The Defra EU Reset Portfolio Delivery Programme will deliver the Defra Outcome to is working to deliver and implement the UK-EU SPS agreement which will reduce trade barriers with the EU for food, plants and animals.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Delivery of the UK-EU Sanitary and Phytosanitary (SPS) Agreement by mid-2027 remains high risk but deliverable. We are working to assumptions on negotiations and the Parliamentary timetable - both outside the Programme’s direct control - which, if met, will make delivery by mid-2027 achievable.","startDate":null,"endDate":null,"scheduleNarrative":"The portfolio predicted end-date at 25/26-Q4 is scheduled to be 28/9/28. This is primarily due to the following factors: negotiations, Parliamentary timetable and ongoing work to embed and improve delivery mechanisms to realise the full benefits of the deal.","fyBaseline":28.09,"fyForecast":19.89,"fyVariance":29.19,"varianceNarrative":"The budget variance currently exceeds 5%. The variance primarily reflects recruitment challenges during the start up phase, which have slowed the planned ramp up of activity and deferred expenditure in some areas, including digital delivery, resulting in in year headroom against the approved estimate.","wholeLifeCost":832.04,"costNarrative":"The portfolio’s departmentally agreed Whole Life Cost at 25/26 -Q4 is £860m over four years. This is primarily due to the following factors: digital system development and upgrades, including access to EU agencies, systems and databases, staffing costs and fees associated with border control changes.","benefits":null,"benefitsNarrative":"The portfolio is still at the planning stage (Pre-Strategic Outline Case or equivalent) and is not yet in a position to provide specific cost/schedule information. The portfolio is expected to reduce unnecessary checks, paperwork and delays, helping food move more smoothly, reliably and efficiently through the supply chain. Smaller firms are disproportionately affected by high EU-related operational and compliance costs including complex paperwork, border delays and repeat certification costs. Delivering the SPS Agreement takes avoidable costs, delays and disruptions out of the food supply chain, potentially helping to ease pressure on food price inflation. By making trade with the EU easier, cheaper and quicker, the work of the programme reduces cost pressure on businesses, improves the flow of goods and strengthens the resilience of food supplies in a volatile global environment. The benefits of the programme and Agreement will build over time rather than immediately.","themes":["Delivery & schedule","Cost & funding","Technical & integration"],"evidenceExcerpt":"Delivery of the UK-EU Sanitary and Phytosanitary (SPS) Agreement by mid-2027 remains high risk but deliverable. We are working to assumptions on negotiations and the Parliamentary timetable - both outside the Programme’s direct control - which, if met, will make delivery by mid-2027 achievable. The portfolio predicted end-date at 25/26-Q4 is scheduled to be…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The portfolio predicted end-date at 25/26-Q4 is scheduled to be 28/9/28. This is primarily due to the following factors: negotiations, Parliamentary timetable and ongoing work to embed and improve delivery mechanisms to realise the full benefits of the deal.","narrativeClaimKind":null,"history":[{"id":"DEFRA_0587_2526-Q3","year":2026,"name":"EU Delivery Programme","department":"DEFRA","category":"Government Transformation and Service Delivery","description":"The Defra EU Reset Portfolio Delivery Programme will deliver the Defra Outcome to is working to deliver and implement the UK-EU SPS agreement which will reduce trade barriers with the EU for food, plants and animals.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Delivery of the UK-EU Sanitary and Phytosanitary (SPS) Agreement by mid-2027 remains high risk but deliverable. We are working to assumptions on negotiations and the Parliamentary timetable - both outside the Programme’s direct control - which, if met, will make delivery by mid-2027 achievable.","startDate":null,"endDate":null,"scheduleNarrative":"The portfolio predicted end-date at 25/26-Q4 is scheduled to be 28/9/28. This is primarily due to the following factors: negotiations, Parliamentary timetable and ongoing work to embed and improve delivery mechanisms to realise the full benefits of the deal.","fyBaseline":28.09,"fyForecast":19.89,"fyVariance":29.19,"varianceNarrative":"The budget variance currently exceeds 5%. The variance primarily reflects recruitment challenges during the start up phase, which have slowed the planned ramp up of activity and deferred expenditure in some areas, including digital delivery, resulting in in year headroom against the approved estimate.","wholeLifeCost":832.04,"costNarrative":"The portfolio’s departmentally agreed Whole Life Cost at 25/26 -Q4 is £860m over four years. This is primarily due to the following factors: digital system development and upgrades, including access to EU agencies, systems and databases, staffing costs and fees associated with border control changes.","benefits":null,"benefitsNarrative":"The portfolio is still at the planning stage (Pre-Strategic Outline Case or equivalent) and is not yet in a position to provide specific cost/schedule information. The portfolio is expected to reduce unnecessary checks, paperwork and delays, helping food move more smoothly, reliably and efficiently through the supply chain. Smaller firms are disproportionately affected by high EU-related operational and compliance costs including complex paperwork, border delays and repeat certification costs. Delivering the SPS Agreement takes avoidable costs, delays and disruptions out of the food supply chain, potentially helping to ease pressure on food price inflation. By making trade with the EU easier, cheaper and quicker, the work of the programme reduces cost pressure on businesses, improves the flow of goods and strengthens the resilience of food supplies in a volatile global environment. The benefits of the programme and Agreement will build over time rather than immediately.","themes":["Delivery & schedule","Cost & funding","Technical & integration"],"evidenceExcerpt":"Delivery of the UK-EU Sanitary and Phytosanitary (SPS) Agreement by mid-2027 remains high risk but deliverable. We are working to assumptions on negotiations and the Parliamentary timetable - both outside the Programme’s direct control - which, if met, will make delivery by mid-2027 achievable. The portfolio predicted end-date at 25/26-Q4 is scheduled to be…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The portfolio predicted end-date at 25/26-Q4 is scheduled to be 28/9/28. This is primarily due to the following factors: negotiations, Parliamentary timetable and ongoing work to embed and improve delivery mechanisms to realise the full benefits of the deal.","narrativeClaimKind":null}],"previous":null,"ratingDelta":null,"transition":"Not comparable","endDateDeltaDays":null,"attentionScore":28,"attentionReasons":["Current published delivery confidence is Amber","In-year forecast variance is +29.2%"]},{"id":"MOJ_0049_2122-Q3","year":2026,"name":"Evolve: Voice & Video","department":"MOJ","category":"Information and Communications Technology (ICT)","description":"Re-procurement of Voice and Video Services suitable for the current and future needs of the MoJ. The project includes requirements gathering, procurement preparation, competitive procurement and an increase in internal capability followed by the transition of services and exit of the existing contracts.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25-Q4, the Delivery Confidence Assessment (DCA) rating at 25/26-Q4 has increased to Green. This is primarily due to increased time contingency within plans, and significant activities being either complete or in progress in line with project plans.","startDate":"2021-09-27","endDate":"2028-07-14","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end date at 25/26-Q4 changed from 30/11/27 to 14/07/2028. This is primarily due to revision of planned activity timelines to increase contingency based on insights from lessons learned.","fyBaseline":24.06,"fyForecast":13.15,"fyVariance":45.34,"varianceNarrative":"The budget variance exceeds 5%. The underspend is due to reduced in-year activities, requiring costs to be re-profiled into future years.","wholeLifeCost":184.56,"costNarrative":"Compared to financial year 24/25-Q4, the project's Whole Life Costs at 25/26-Q4 have decreased from £385.21m to £184.56m. This is primarily due to significant savings following approval of Full Business Case. All costs have been reported in 2024/25 base prices in line with NISTA requirements. This is a change from previous years where costs were reported in nominal prices. All costs reflect this accounting reduction regardless of any actual changes.","benefits":69.01,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's monetised benefits at 25/26-Q4 have increased from £0 to £69.01m. This is primarily due to the confirmation of monetisation of benefits following approval of Full Business Case. All costs have been reported in 2024/25 base prices in line with NISTA requirements. This is a change from previous years where costs were reported in nominal prices. All costs will reflect this accounting reduction regardless of any actual changes.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 24/25-Q4, the Delivery Confidence Assessment (DCA) rating at 25/26-Q4 has increased to Green. This is primarily due to increased time contingency within plans, and significant activities being either complete or in progress in line with project plans. Compared to financial year 24/25-Q4, the project's end date at 25/26-Q4 changed…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end date at 25/26-Q4 changed from 30/11/27 to 14/07/2028. This is primarily due to revision of planned activity timelines to increase contingency based on insights from lessons learned.","narrativeClaimKind":null,"history":[{"id":"MOJ_0049_2122-Q3","year":2022,"name":"Evolve Voice & Video Services","department":"MOJ","category":"ICT","description":"Re-procurement of Voice and Video Services suitable for the current and future needs of the Authority, to replace the existing FITS Voice and Video (VVI) contract and comply with Public Procurement regulations. The project includes requirements gathering, ITT / Procurement preparation, competitive procurement followed by the transition of services and exit of the existing contracts.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 21/22-Q4 is Amber. This is the first time data has been published for this project, which has been added to GMPP over the last year. The DCA is Amber primarily due to the following factors: Delays with the start of procurement for the strategic contact centre service due to additional business scope and commercial preparation for that Procurement.","startDate":"2021-09-27","endDate":"2025-04-30","scheduleNarrative":"Your project end-date is 30 APR 2025. This is primarily due to the following factors: Project is still expecting to deliver to timescales, within the funding envelope in the Outline Business Case.","fyBaseline":2.6,"fyForecast":3.47,"fyVariance":33.0,"varianceNarrative":"The budget variance exceeds 5%. The Forecast was increased to reflect the need for additional contracted resources to accelerate delivery.","wholeLifeCost":206.0,"costNarrative":"Your projects Baseline Whole Life Cost is 206.30 (£m). This is primarily due to the following factors: RDEL One Off costs contain Project resources, Transition costs, Legal Fees & Delivery Partner costs RDEL On going costs will be BAU running costs for the new service","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 21/22-Q4 is Amber. This is the first time data has been published for this project, which has been added to GMPP over the last year. The DCA is Amber primarily due to the following factors: Delays with the start of procurement for the strategic contact centre service due to additional…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Your project end-date is 30 APR 2025. This is primarily due to the following factors: Project is still expecting to deliver to timescales, within the funding envelope in the Outline Business Case.","narrativeClaimKind":null},{"id":"MOJ_0049_2122-Q3","year":2023,"name":"Evolve: Voice & Video","department":"MOJ","category":"ICT","description":"Re-procurement of Voice and Video Services suitable for the current and future needs of the Authority, to replace the existing Future IT Services Voice and Video contracts. The project includes requirements gathering, ITT/Procurement preparation, competitive procurement and an increase in internal capability followed by the transition of services and exit of the existing contracts.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 21/22-Q4, Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 increased from Amber to Green. This is primarily due to the following factors. Compared to 21/22 Q4, the project's Delivery Confidence Assessment rating increased from Amber to Green.The Green assessment is due the project being on track against the re-baselined schedule and costs.","startDate":"2021-09-27","endDate":"2027-04-30","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 increased from 2025-04-30 to 2027-04-30. This is primarily due to the following factors. The project has re-baselined in January 2023 due to changes to procurement timelines.","fyBaseline":5.3,"fyForecast":7.03,"fyVariance":33.0,"varianceNarrative":"The overspend is due to increased resource costs, driven by the rebaselining activity.","wholeLifeCost":206.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 remained at 206m. This is primarily due to the following factors. The Whole Life Cost has remained static, and the budget remains aligned to the current baseline business case.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This project currently reports no monetised benefits. The project benefits focus on the continued quality of operation of voice and video services contracts.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 increased from Amber to Green. This is primarily due to the following factors. Compared to 21/22 Q4, the project's Delivery Confidence Assessment rating increased from Amber to Green.The Green assessment is due the project being on track against…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 increased from 2025-04-30 to 2027-04-30. This is primarily due to the following factors. The project has re-baselined in January 2023 due to changes to procurement timelines.","narrativeClaimKind":null},{"id":"MOJ_0049_2122-Q3","year":2024,"name":"Evolve: Voice & Video","department":"MOJ","category":"ICT","description":"Re-procurement of Voice and Video Services suitable for the current and future needs of the Authority, to replace the existing Future IT Services Voice and Video contracts. The project includes requirements gathering, Procurement preparation, competitive procurement and an increase in internal capability followed by the transition of services and exit of the existing contracts.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Green. This is primarily due to the following factors. The programme remains on track to deliver.","startDate":"2021-09-27","endDate":"2027-10-29","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 increased from 2027-04-30 to 2027-10-29. This is primarily due to the following factors. The programme has rebaselined its schedule to allow for effective exit and decommissioning activities during project closure.","fyBaseline":15.1,"fyForecast":9.5,"fyVariance":-37.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The underspend is due to reduced in-year activities requiring costs to be re-profiled into future years.","wholeLifeCost":206.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 remained at 206m. This is primarily due to the following factors. The Whole Life Cost has remained static, and the budget remains aligned to the current baseline business cases.","benefits":0.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 0m. This project currently reports no monetised benefits. The project's benefits focus on the continued quality of operation of Voice and Video Services Contracts","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Green. This is primarily due to the following factors. The programme remains on track to deliver. Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 increased from 2027-04-30 to 2027-10-29. This is primarily…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 increased from 2027-04-30 to 2027-10-29. This is primarily due to the following factors. The programme has rebaselined its schedule to allow for effective exit and decommissioning activities during project closure.","narrativeClaimKind":null},{"id":"MOJ_0049_2122-Q3","year":2025,"name":"Evolve: Voice & Video","department":"MoJ","category":"ICT","description":"Re-procurement of Voice and Video Services suitable for the current and future needs of the Authority, to replace the existing Future IT Services Voice and Video contracts. The project includes requirements gathering, Procurement preparation, competitive procurement and an increase in internal capability followed by the transition of services and exit of the existing contracts.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 decreased from GREEN to AMBER. This is primarily due to the following factors‚ Timetable risks due to complexity of multiple procurements mobilisations and limited schedule contingency.","startDate":"2021-09-27","endDate":"2027-11-30","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 29/10/2027 to 30/11/2027. This is primarily due to the following factors‚ Timetable risks due to complexity of multiple procurements mobilisations.","fyBaseline":31.85,"fyForecast":17.96,"fyVariance":43.61,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The underspend is due to reduce in-year activities, requiring costs to be re-profiled into future years.","wholeLifeCost":385.21,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 206 to 385. This is primarily due to the following factors‚ Outline Business Case update to include indexation across the contract duration and contingency, following an increase in scope, although WLC is forecast to reduce below 23/24 WLC following approval of Full Business Case.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ This project currently reports no monetised benefits. Confirmation of monetised benefits will be aligned to approval of Full Business Case.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 decreased from GREEN to AMBER. This is primarily due to the following factors‚ Timetable risks due to complexity of multiple procurements mobilisations and limited schedule contingency. Compared to financial year 23/24-Q4, the…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 29/10/2027 to 30/11/2027. This is primarily due to the following factors‚ Timetable risks due to complexity of multiple procurements mobilisations.","narrativeClaimKind":null},{"id":"MOJ_0049_2122-Q3","year":2026,"name":"Evolve: Voice & Video","department":"MOJ","category":"Information and Communications Technology (ICT)","description":"Re-procurement of Voice and Video Services suitable for the current and future needs of the MoJ. The project includes requirements gathering, procurement preparation, competitive procurement and an increase in internal capability followed by the transition of services and exit of the existing contracts.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25-Q4, the Delivery Confidence Assessment (DCA) rating at 25/26-Q4 has increased to Green. This is primarily due to increased time contingency within plans, and significant activities being either complete or in progress in line with project plans.","startDate":"2021-09-27","endDate":"2028-07-14","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end date at 25/26-Q4 changed from 30/11/27 to 14/07/2028. This is primarily due to revision of planned activity timelines to increase contingency based on insights from lessons learned.","fyBaseline":24.06,"fyForecast":13.15,"fyVariance":45.34,"varianceNarrative":"The budget variance exceeds 5%. The underspend is due to reduced in-year activities, requiring costs to be re-profiled into future years.","wholeLifeCost":184.56,"costNarrative":"Compared to financial year 24/25-Q4, the project's Whole Life Costs at 25/26-Q4 have decreased from £385.21m to £184.56m. This is primarily due to significant savings following approval of Full Business Case. All costs have been reported in 2024/25 base prices in line with NISTA requirements. This is a change from previous years where costs were reported in nominal prices. All costs reflect this accounting reduction regardless of any actual changes.","benefits":69.01,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's monetised benefits at 25/26-Q4 have increased from £0 to £69.01m. This is primarily due to the confirmation of monetisation of benefits following approval of Full Business Case. All costs have been reported in 2024/25 base prices in line with NISTA requirements. This is a change from previous years where costs were reported in nominal prices. All costs will reflect this accounting reduction regardless of any actual changes.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 24/25-Q4, the Delivery Confidence Assessment (DCA) rating at 25/26-Q4 has increased to Green. This is primarily due to increased time contingency within plans, and significant activities being either complete or in progress in line with project plans. Compared to financial year 24/25-Q4, the project's end date at 25/26-Q4 changed…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end date at 25/26-Q4 changed from 30/11/27 to 14/07/2028. This is primarily due to revision of planned activity timelines to increase contingency based on insights from lessons learned.","narrativeClaimKind":null}],"previous":{"id":"MOJ_0049_2122-Q3","year":2025,"name":"Evolve: Voice & Video","department":"MoJ","category":"ICT","description":"Re-procurement of Voice and Video Services suitable for the current and future needs of the Authority, to replace the existing Future IT Services Voice and Video contracts. The project includes requirements gathering, Procurement preparation, competitive procurement and an increase in internal capability followed by the transition of services and exit of the existing contracts.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 decreased from GREEN to AMBER. This is primarily due to the following factors‚ Timetable risks due to complexity of multiple procurements mobilisations and limited schedule contingency.","startDate":"2021-09-27","endDate":"2027-11-30","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 29/10/2027 to 30/11/2027. This is primarily due to the following factors‚ Timetable risks due to complexity of multiple procurements mobilisations.","fyBaseline":31.85,"fyForecast":17.96,"fyVariance":43.61,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The underspend is due to reduce in-year activities, requiring costs to be re-profiled into future years.","wholeLifeCost":385.21,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 206 to 385. This is primarily due to the following factors‚ Outline Business Case update to include indexation across the contract duration and contingency, following an increase in scope, although WLC is forecast to reduce below 23/24 WLC following approval of Full Business Case.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ This project currently reports no monetised benefits. Confirmation of monetised benefits will be aligned to approval of Full Business Case.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 decreased from GREEN to AMBER. This is primarily due to the following factors‚ Timetable risks due to complexity of multiple procurements mobilisations and limited schedule contingency. Compared to financial year 23/24-Q4, the…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 29/10/2027 to 30/11/2027. This is primarily due to the following factors‚ Timetable risks due to complexity of multiple procurements mobilisations.","narrativeClaimKind":null},"ratingDelta":-1,"transition":"Improved","endDateDeltaDays":227,"attentionScore":28,"attentionReasons":["Published end date moved 227 days later","In-year forecast variance is +45.3%"]},{"id":"DCMS_0020_2122-Q1","year":2026,"name":"Shared Rural Network","department":"DSIT","category":"Infrastructure and Construction","description":"The Shared Rural Network (SRN) programme is a deal between government and the four Mobile Network Operators (MNOs) - EE, Virgin Media O2, Vodafone and Three (with obligations flowing through to any subsequent merged entity). It has achieved its overarching objectives of delivering 4G coverage to 95% of UK landmass, 280,000 premises and 16,000km of roads over 12 months ahead of the programme deadline of the end of 2025, with the most significant coverage improvements in rural parts of Scotland and Wales. The SRN programme is split between public and privately funded elements and underpinned by the MNOs’ spectrum licence obligations. In line with the six-year capital funding period, the MNOs’ legally binding spectrum obligations for the SRN must be achieved by January 2027 and the programme will continue to deliver coverage improvements up to that point. Having achieved the overarching objectives of the SRN programme, government and the MNOs agreed a revised plan in July 2025 to target the remaining deployment of infrastructure in places where the benefits will be felt the most.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 increased to Green. This is primarily due to the programme having delivered its overarching objectives for coverage, premises and roads‚ a year ahead of schedule. The SRN Programme team has completed actions to implement the recommendations of the January 2025 Gateway 0 Review. These focused on refining the remaining delivery of the programme (given achievement of the overall objectives) to maximise effectiveness of the governance and value derived from the programme, improving communications to further align and strengthen stakeholder support, and ensuring the team's operating model is ready for the longer-term grant funding claims operation. The revised, targeted portfolio agreed with the MNOs in July 2025 is now in delivery alongside enhanced reporting requirements to monitor delivery progress effectively. BDUK has implemented a plan to support an increased volume of grant claims, which was informed by findings from a GIAA audit of the SRN programme’s grant management processes.","startDate":"2020-03-11","endDate":"2041-02-11","scheduleNarrative":"The Grant Agreement allocates funding up to and including FY 2040/41. The Transparency Notice was published on 11/03/2021, stating that SRN will start in February 2021 and is a 20-year programme. Publication of the Transparency Notice was delayed due to ongoing Brexit negotiations spilling over from 2020 to 2021. Funding could not be released until the Notice had been published and this in turn required changes to the Grant Agreement.","fyBaseline":94.44,"fyForecast":71.19,"fyVariance":24.62,"varianceNarrative":"Underspend in the 2025/26 budget has occurred due to reprofiling. This is the result of government working with the MNOs to revise the delivery plan in light of the SRN programme hitting its overall objectives over 12 months ahead of schedule. Underspend has also occurred due to slippage of MNO build activity into later financial years of the programme.","wholeLifeCost":328.19,"costNarrative":"The grant funding envelope was set by the HMT-approved business case in 2020 and continues to be sufficient to deliver the programme effectively. A reduction in the Whole Life Cost was made in 25/26 when the revised approach to the programme was agreed with the MNOs.","benefits":2128.05,"benefitsNarrative":"The benefits model was enhanced in late 2025 to improve accuracy, reflect new evidence and incorporate more granular data.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 increased to Green. This is primarily due to the programme having delivered its overarching objectives for coverage, premises and roads‚ a year ahead of schedule. The SRN Programme team has completed actions to implement the recommendations of the…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The Grant Agreement allocates funding up to and including FY 2040/41. The Transparency Notice was published on 11/03/2021, stating that SRN will start in February 2021 and is a 20-year programme. Publication of the Transparency Notice was delayed due to ongoing Brexit negotiations spilling over from 2020 to 2021. Funding could not be released until the Notice had been published and this in turn required changes to the Grant Agreement.","narrativeClaimKind":null,"history":[{"id":"DCMS_0020_2122-Q1","year":2022,"name":"Shared Rural Network","department":"DCMS","category":"Infrastructure and Construction","description":"The Shared Rural Network (SRN) programme is a £1 billion deal with the four Mobile Network Operators (MNOs) - EE, Three, Virgin Media O2, Vodafone - to deliver 4G coverage to 95% of UK landmass by the end of the programme, underpinned by spectrum obligations. The most significant coverage improvements will be in rural parts of Scotland, Northern Ireland and Wales, providing guaranteed coverage to 280,000 premises and 16,000 km of roads. The SRN programme is split between public and privately funded elements. In line with the six year capital funding period, the legally binding spectrum obligations for the SRN must be met by January 2027 and the programme will continue to deliver coverage improvements up to that point. The programme remains on track both the government and MNOs are confident that this combined coverage is expected to be delivered to 95% of UK geography by the end of 2025.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Senior Responsible Owner Delivery Confidence Assessment rating at 21/22-Q4 is Amber The SRN Programme team has resolved the majority of the recommendations including those deemed critical and essential in the June 2021 Gateway 0 Review. A number of recommendations focused on the relationship with the Home Office the key commercial site share agreement between the Mobile Network Operators and the Home Office. Significant progress has been made in both these areas the relationship with the Home Office is much stronger underpinned with stronger Governance and improved information sharing. And significant progress has been made on the site share agreement. Other recommendations focused on the Total Not Spot (TNS) project in terms of progressing the appointment of an Independent Assessor (which has been completed).","startDate":"2020-03-11","endDate":"2040-03-11","scheduleNarrative":"Your project end-date is 11 MAR 2040. This is primarily due to the following factors: SRN's end date is 01/01/2041","fyBaseline":4.2,"fyForecast":4.2,"fyVariance":0.0,"varianceNarrative":"The budget variance is inferior or equal to 5%. Not applicable","wholeLifeCost":512.0,"costNarrative":"Your projects Baseline Whole Life Cost is 511.80 (£m). This is primarily due to the following factors: Expenditure forecasts align to SR21.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Commercial & supply chain"],"evidenceExcerpt":"The Senior Responsible Owner Delivery Confidence Assessment rating at 21/22-Q4 is Amber The SRN Programme team has resolved the majority of the recommendations including those deemed critical and essential in the June 2021 Gateway 0 Review. A number of recommendations focused on the relationship with the Home Office the key commercial site share agreement…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Your project end-date is 11 MAR 2040. This is primarily due to the following factors: SRN's end date is 01/01/2041","narrativeClaimKind":null},{"id":"DCMS_0020_2122-Q1","year":2023,"name":"Shared Rural Network","department":"DSIT","category":"Infrastructure and Construction","description":"The Shared Rural Network (SRN) programme is a 1 billion deal with the four Mobile Network Operators (MNOs) - EE, Three, Virgin Media O2, Vodafone - to deliver 4G coverage to 95% of UK landmass by the end of the programme, underpinned by spectrum obligations. The most significant coverage improvements will be in rural parts of Scotland, Northern Ireland and Wales, providing guaranteed coverage to 280,000 premises and 16,000 km of roads. The SRN programme is split between public and privately funded elements. In line with the six year capital funding period, the legally binding spectrum obligations for the SRN must be met by January 2027 and the programme will continue to deliver coverage improvements up to that point. The programme remains on track both the government and MNOs are confident that this combined coverage is expected to be delivered to 95% of UK geography by the end of 2025.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 21/22-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. The SRN Programme team has resolved the majority of the recommendations including those deemed critical and essential in the November 2022 Gateway 0 Review. A number of recommendations focused on the relationship with the Home Office and the key commercial site share agreement between the Mobile Network Operators and the Home Office. Significant progress has been made in both these areas: The relationship with the Home Office is much stronger, underpinned with stronger Governance and improved information sharing between the organisations. The Programme has also actively worked on the recommendations including the need for the programme to keep evolving in preparation for its delivery phase; the team has increased PPM skills through successfully onboarding staff with extensive Project Delivery experience, with some joining from sponsorship and/or grant-distributing programmes.","startDate":"2020-03-11","endDate":"2040-03-11","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2040-03-11. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2040-03-11. This is primarily due to the following factors. Correction of previously incorrect information: The current Grant Agreement notes funding up to and including FY 2040/41. The Transparency Notice was published on 11/03/2021, stating that SRN will start in February 2021 and is a 20 year programme. Publication of the Transparency Notice was delayed due to ongoing Brexit negotiations spilling over from 2020 to 2021. Funding could not be released until the Notice had been published and this in turn required changes to the Grant Agreement.","fyBaseline":22.0,"fyForecast":7.5,"fyVariance":-66.0,"varianceNarrative":"The budget variance exceeds 5%. Not applicable","wholeLifeCost":512.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 remained at 512m. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 remained at 512m. This is primarily due to the following factors. Total expenditure (whole life costs) forecast aligns to the business case.","benefits":1351.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 1351m. The Shared Rural Network Programmes monetised benefits baseline and forecasts have been provided. These numbers were both generated for the Full Business Case in February 2020. Work to quantify the benefits involved a comprehensive literature review looking at the potential benefits of mobile coverage, before generating a shortlist of viable use cases and monetising them. Work is currently underway to improve our benefits predictions for the Shared Rural Network.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. The SRN Programme team has resolved the majority of the recommendations including those deemed critical and essential in the November 2022 Gateway 0 Review. A number of…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2040-03-11. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2040-03-11. This is primarily due to the following factors. Correction of previously incorrect information: The current Grant Agreement notes funding up to and including FY 2040/41. The Transparency Notice was published on 11/03/2021, stating that SRN will start in February 2021 and is a 20 year programme. Publication of the Transparency Notice was delayed due to ongoing Brexit negotiations spilling over from 2020 to 2021. Funding could not be released until the Notice had been published and this in turn required changes to the Grant Agreement.","narrativeClaimKind":null},{"id":"DCMS_0020_2122-Q1","year":2024,"name":"Shared Rural Network","department":"DSIT","category":"Infrastructure and Construction","description":"The Shared Rural Network (SRN) programme is a 1 billion deal with the four Mobile Network Operators (MNOs) - EE, Three, Virgin Media_x000D_ O2, Vodafone - to deliver 4G coverage to 95% of UK landmass by the end of the programme, underpinned by spectrum licence obligations. The most significant coverage improvements will be in rural parts of Scotland and Wales. Uplifts in coverage during the programme will provide coverage to 280,000 premises and 16,000 km of roads. The SRN programme is split between public and privately funded elements. In line with the six year capital funding period, the legally binding spectrum obligations for the SRN must be met by January 2027 and the programme will continue to deliver coverage improvements up to that point. Whilst the programme has faced challenges and some delays, it remains on track, and both the government and MNOs are confident that this combined coverage is expected to be delivered to 95% of UK geography by the end of 2025.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The SRN Programme team has resolved all the recommendations in the November 2022 Gateway 0 Review. Some of these focused on the relationship with the Home Office (HO) and the key commercial site share agreement between the mobile network operators and the Home Office; significant progress has been made in both areas - the MSSA is signed by all parties. The relationship with HO is much stronger, underpinned with stronger Governance and improved information sharing. The Programme has also continued evolving into delivery phase; the team has increased project delivery skills through successfully onboarding of new staff, with some joining from sponsorship and/or grant-distributing programmes. _x000D_ Since the review in November 2022, the NAO has conducted a review of the SRN programme. Key recommendations centred on improving data sharing and ensuring maximal benefit for public money. BDUK is undertaking steps to act on these, working with its delivery partners.","startDate":"2020-03-11","endDate":"2040-03-11","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2040-03-11. This is primarily due to the following factors. The current Grant Agreement notes funding up to and including FY 2040/41. The Transparency Notice was published on 11/03/2021, stating that SRN will start in February 2021 and is a 20 year programme. Publication of the Transparency Notice was delayed due to ongoing Brexit negotiations spilling over from 2020 to 2021. Funding could not be released until the Notice had been published and this in turn required changes to the Grant Agreement.","fyBaseline":62.4,"fyForecast":15.21,"fyVariance":-76.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. Underspend in the current financial year due to reprofiling and slippage into later financial years of the programme.","wholeLifeCost":512.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 remained at 512m. This is primarily due to the following factors. The increase is due to rounding.","benefits":1351.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 1351m. The Shared Rural Network Programme's monetised benefits baseline and forecasts have been provided. These numbers were both generated for the Full Business Case in February 2020. Work to quantify the benefits involved a comprehensive literature review looking at the potential benefits of mobile coverage, before generating a shortlist of viable use cases and monetising them. Work is currently underway to improve our benefits predictions for the Shared Rural Network.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The SRN Programme team has resolved all the recommendations in the November 2022 Gateway 0 Review. Some of these focused on the relationship with the Home Office (HO) and the…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2040-03-11. This is primarily due to the following factors. The current Grant Agreement notes funding up to and including FY 2040/41. The Transparency Notice was published on 11/03/2021, stating that SRN will start in February 2021 and is a 20 year programme. Publication of the Transparency Notice was delayed due to ongoing Brexit negotiations spilling over from 2020 to 2021. Funding could not be released until the Notice had been published and this in turn required changes to the Grant Agreement.","narrativeClaimKind":null},{"id":"DCMS_0020_2122-Q1","year":2025,"name":"Shared Rural Network","department":"DSIT","category":"Infrastructure and Construction","description":"The Shared Rural Network (SRN) programme is a deal between government and the four Mobile Network Operators (MNOs) - EE, Virgin Media O2, Vodafone and Three (with obligations flowing through to any subsequent merged entity). It has achieved its overarching objectives of delivering 4G coverage to 95% of UK landmass, 280,000 premises and 16,000km of roads over 12 months ahead of the programme deadline of the end of 2025, with the most significant coverage improvements in rural parts of Scotland and Wales. The SRN programme is split between public and privately funded elements and underpinned by the MNOs’ spectrum licence obligations. In line with the six-year capital funding period, the MNOs’ legally binding spectrum obligations for the SRN, which are still yet to be met, must be achieved by January 2027 and the programme will continue to deliver coverage improvements up to that point. Having achieved the overarching objectives of the SRN programme, government and the MNOs have worked together to agree a revised plan to target remaining deployment of infrastructure in places where the benefit will be felt the most.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The SRN Programme team is undertaking steps to act on the recommendations in the January 2025 Gateway 0 Review. These focused on refining the remaining delivery of the programme (given achievement of the overall objectives) to maximise effectiveness of the governance and value derived from the programme, improving communications to further align and strengthen stakeholder support, and ensuring the team's operating model is ready for the longer-term grant funding claims operation. Significant progress has been made in all areas: BDUK has agreed a revised, targeted delivery portfolio with the MNOs with improvements to the associated reporting requirements, Mova and BDUK own a joint communications strategy, and BDUK has a plan to support an increased volume of grant claims, which has also been informed by findings from a recent GIAA audit of the SRN programme’s grant management processes. Updates to the PAC recommendations were also published in March, confirming completion of cost assurance work, a refreshed benefits model, and improved access to management information to effectively monitor delivery progress.","startDate":"2020-03-11","endDate":"2040-03-11","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 11/03/2040. This is primarily due to the following factors‚ The Grant Agreement allocates funding up to and including FY 2040/41. The Transparency Notice was published on 11/03/2021, stating that SRN will start in February 2021 and is a 20-year programme. Publication of the Transparency Notice was delayed due to ongoing Brexit negotiations spilling over from 2020 to 2021. Funding could not be released until the Notice had been published and this in turn required changes to the Grant Agreement.","fyBaseline":95.4,"fyForecast":33.3,"fyVariance":65.09,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ Underspend in the current financial year has occurred due to reprofiling and slippage into later financial years of the programme. This is primarily the result of government working with the MNOs to revise the delivery plan in light of the SRN programme hitting its overall objectives over 12 months ahead of schedule.","wholeLifeCost":512.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 512. This is primarily due to the following factors‚ The grant funding envelope was set by the HMT-approved business case in 2020 and continues to be sufficient to deliver the programme effectively. A reduction in the Whole Life Cost can be expected for 25/26 when the revised approach to the programme that has been agreed with the MNOs, takes effect.","benefits":1351.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 1351. This is primarily due to the following factors‚ Benefits are accounted for in real prices (base year 2019/20) as they are adjusted for inflation over time. This is in line with the 2020 business case, which used real benefits (base year 2019/20).","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The SRN Programme team is undertaking steps to act on the recommendations in the January 2025 Gateway 0 Review. These focused on refining the remaining delivery of…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 11/03/2040. This is primarily due to the following factors‚ The Grant Agreement allocates funding up to and including FY 2040/41. The Transparency Notice was published on 11/03/2021, stating that SRN will start in February 2021 and is a 20-year programme. Publication of the Transparency Notice was delayed due to ongoing Brexit negotiations spilling over from 2020 to 2021. Funding could not be released until the Notice had been published and this in turn required changes to the Grant Agreement.","narrativeClaimKind":null},{"id":"DCMS_0020_2122-Q1","year":2026,"name":"Shared Rural Network","department":"DSIT","category":"Infrastructure and Construction","description":"The Shared Rural Network (SRN) programme is a deal between government and the four Mobile Network Operators (MNOs) - EE, Virgin Media O2, Vodafone and Three (with obligations flowing through to any subsequent merged entity). It has achieved its overarching objectives of delivering 4G coverage to 95% of UK landmass, 280,000 premises and 16,000km of roads over 12 months ahead of the programme deadline of the end of 2025, with the most significant coverage improvements in rural parts of Scotland and Wales. The SRN programme is split between public and privately funded elements and underpinned by the MNOs’ spectrum licence obligations. In line with the six-year capital funding period, the MNOs’ legally binding spectrum obligations for the SRN must be achieved by January 2027 and the programme will continue to deliver coverage improvements up to that point. Having achieved the overarching objectives of the SRN programme, government and the MNOs agreed a revised plan in July 2025 to target the remaining deployment of infrastructure in places where the benefits will be felt the most.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 increased to Green. This is primarily due to the programme having delivered its overarching objectives for coverage, premises and roads‚ a year ahead of schedule. The SRN Programme team has completed actions to implement the recommendations of the January 2025 Gateway 0 Review. These focused on refining the remaining delivery of the programme (given achievement of the overall objectives) to maximise effectiveness of the governance and value derived from the programme, improving communications to further align and strengthen stakeholder support, and ensuring the team's operating model is ready for the longer-term grant funding claims operation. The revised, targeted portfolio agreed with the MNOs in July 2025 is now in delivery alongside enhanced reporting requirements to monitor delivery progress effectively. BDUK has implemented a plan to support an increased volume of grant claims, which was informed by findings from a GIAA audit of the SRN programme’s grant management processes.","startDate":"2020-03-11","endDate":"2041-02-11","scheduleNarrative":"The Grant Agreement allocates funding up to and including FY 2040/41. The Transparency Notice was published on 11/03/2021, stating that SRN will start in February 2021 and is a 20-year programme. Publication of the Transparency Notice was delayed due to ongoing Brexit negotiations spilling over from 2020 to 2021. Funding could not be released until the Notice had been published and this in turn required changes to the Grant Agreement.","fyBaseline":94.44,"fyForecast":71.19,"fyVariance":24.62,"varianceNarrative":"Underspend in the 2025/26 budget has occurred due to reprofiling. This is the result of government working with the MNOs to revise the delivery plan in light of the SRN programme hitting its overall objectives over 12 months ahead of schedule. Underspend has also occurred due to slippage of MNO build activity into later financial years of the programme.","wholeLifeCost":328.19,"costNarrative":"The grant funding envelope was set by the HMT-approved business case in 2020 and continues to be sufficient to deliver the programme effectively. A reduction in the Whole Life Cost was made in 25/26 when the revised approach to the programme was agreed with the MNOs.","benefits":2128.05,"benefitsNarrative":"The benefits model was enhanced in late 2025 to improve accuracy, reflect new evidence and incorporate more granular data.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 increased to Green. This is primarily due to the programme having delivered its overarching objectives for coverage, premises and roads‚ a year ahead of schedule. The SRN Programme team has completed actions to implement the recommendations of the…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The Grant Agreement allocates funding up to and including FY 2040/41. The Transparency Notice was published on 11/03/2021, stating that SRN will start in February 2021 and is a 20-year programme. Publication of the Transparency Notice was delayed due to ongoing Brexit negotiations spilling over from 2020 to 2021. Funding could not be released until the Notice had been published and this in turn required changes to the Grant Agreement.","narrativeClaimKind":null}],"previous":{"id":"DCMS_0020_2122-Q1","year":2025,"name":"Shared Rural Network","department":"DSIT","category":"Infrastructure and Construction","description":"The Shared Rural Network (SRN) programme is a deal between government and the four Mobile Network Operators (MNOs) - EE, Virgin Media O2, Vodafone and Three (with obligations flowing through to any subsequent merged entity). It has achieved its overarching objectives of delivering 4G coverage to 95% of UK landmass, 280,000 premises and 16,000km of roads over 12 months ahead of the programme deadline of the end of 2025, with the most significant coverage improvements in rural parts of Scotland and Wales. The SRN programme is split between public and privately funded elements and underpinned by the MNOs’ spectrum licence obligations. In line with the six-year capital funding period, the MNOs’ legally binding spectrum obligations for the SRN, which are still yet to be met, must be achieved by January 2027 and the programme will continue to deliver coverage improvements up to that point. Having achieved the overarching objectives of the SRN programme, government and the MNOs have worked together to agree a revised plan to target remaining deployment of infrastructure in places where the benefit will be felt the most.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The SRN Programme team is undertaking steps to act on the recommendations in the January 2025 Gateway 0 Review. These focused on refining the remaining delivery of the programme (given achievement of the overall objectives) to maximise effectiveness of the governance and value derived from the programme, improving communications to further align and strengthen stakeholder support, and ensuring the team's operating model is ready for the longer-term grant funding claims operation. Significant progress has been made in all areas: BDUK has agreed a revised, targeted delivery portfolio with the MNOs with improvements to the associated reporting requirements, Mova and BDUK own a joint communications strategy, and BDUK has a plan to support an increased volume of grant claims, which has also been informed by findings from a recent GIAA audit of the SRN programme’s grant management processes. Updates to the PAC recommendations were also published in March, confirming completion of cost assurance work, a refreshed benefits model, and improved access to management information to effectively monitor delivery progress.","startDate":"2020-03-11","endDate":"2040-03-11","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 11/03/2040. This is primarily due to the following factors‚ The Grant Agreement allocates funding up to and including FY 2040/41. The Transparency Notice was published on 11/03/2021, stating that SRN will start in February 2021 and is a 20-year programme. Publication of the Transparency Notice was delayed due to ongoing Brexit negotiations spilling over from 2020 to 2021. Funding could not be released until the Notice had been published and this in turn required changes to the Grant Agreement.","fyBaseline":95.4,"fyForecast":33.3,"fyVariance":65.09,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ Underspend in the current financial year has occurred due to reprofiling and slippage into later financial years of the programme. This is primarily the result of government working with the MNOs to revise the delivery plan in light of the SRN programme hitting its overall objectives over 12 months ahead of schedule.","wholeLifeCost":512.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 512. This is primarily due to the following factors‚ The grant funding envelope was set by the HMT-approved business case in 2020 and continues to be sufficient to deliver the programme effectively. A reduction in the Whole Life Cost can be expected for 25/26 when the revised approach to the programme that has been agreed with the MNOs, takes effect.","benefits":1351.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 1351. This is primarily due to the following factors‚ Benefits are accounted for in real prices (base year 2019/20) as they are adjusted for inflation over time. This is in line with the 2020 business case, which used real benefits (base year 2019/20).","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The SRN Programme team is undertaking steps to act on the recommendations in the January 2025 Gateway 0 Review. These focused on refining the remaining delivery of…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 11/03/2040. This is primarily due to the following factors‚ The Grant Agreement allocates funding up to and including FY 2040/41. The Transparency Notice was published on 11/03/2021, stating that SRN will start in February 2021 and is a 20-year programme. Publication of the Transparency Notice was delayed due to ongoing Brexit negotiations spilling over from 2020 to 2021. Funding could not be released until the Notice had been published and this in turn required changes to the Grant Agreement.","narrativeClaimKind":null},"ratingDelta":-1,"transition":"Improved","endDateDeltaDays":337,"attentionScore":27,"attentionReasons":["Published end date moved 337 days later","In-year forecast variance is +24.6%"]},{"id":"DHSC_0066_2021-Q2","year":2026,"name":"NEW HOSPITAL PROGRAMME","department":"DHSC","category":"Infrastructure and Construction","description":"The New Hospital Programme was set up in October 2020 to deliver a combination of health, infrastructure and major programme capital delivery. The New Hospital Programme incorporated 46 hospital schemes, which includes the replacement of seven hospitals built wholly or mostly from Reinforced Autoclaved Aerated Concrete (RAAC).","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"As with financial year 24/25-Q4, NISTA’s Delivery Confidence Assessment rating at 25/26-Q4 remained at AMBER. This is primarily due to the following factors which have strengthened governance and assurance: working towards finalising a three-year Business Plan that will enable clearer spend decisions; strengthening capital delegations to allow higher value business case approvals e.g. for enabling works; strengthening governance and assurance; and prioritising recruitment to senior delivery team roles. The procurement of the Hospital 2.0 Alliance (H2A) was successfully completed, with the H2A Framework and Alliance Joining Agreements fully executed.","startDate":"2021-01-01","endDate":"2046-04-05","scheduleNarrative":"The programme end-date at 25/26-Q4 is 05/04/2046. The NHP continues to work closely with Trusts to progress their schemes in line with the timelines set out in the published Plan for Implementation. The latest agreed version of the Programme Business Case was fully approved in February 2025; the Hospital 2.0 standardised system is well advanced; and the Hospital 2.0 Alliance procurement has been concluded successfully. The hospitals that are being replaced due to being constructed wholly or mostly from Reinforced Autoclaved Aerated Concrete (RAAC) remain a programme priority.","fyBaseline":931.81,"fyForecast":708.06,"fyVariance":24.01,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The scheme budgets in the SR were established during the NHP review, we have seen some slippage during 2025/26 and are working to get spend back on track over the course of the Spending Review period","wholeLifeCost":47523.91,"costNarrative":"The project's departmentally agreed Whole Life Cost at 25/26-Q4 remained at the same level as 24/25. This is primarily due to the following factors Whole Life Costs do not include Pre-programme expenditure, or BAU running costs for each project. This will be assessed via individual business cases and funded over the lifetime of the asset. Whole Life Costs are now based on the latest agreed Programme Business Case, which was fully approved in February 2025, and covers 46 schemes for completion by 2045/46.","benefits":59407.0,"benefitsNarrative":"The project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained as per 24/25. This is primarily due to the following factors‚ This is now based on the latest agreed Programme Business Case, which was fully approved in February 2025. It includes efficiency benefits in nominal terms over 60 years post construction and inflates this by a rate of 2%. This considers cash releasing and non-cash releasing efficiency benefits, but not societal benefits as these are not counted as efficiencies.","themes":["Cost & funding","Governance & assurance","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"As with financial year 24/25-Q4, NISTA’s Delivery Confidence Assessment rating at 25/26-Q4 remained at AMBER. This is primarily due to the following factors which have strengthened governance and assurance: working towards finalising a three-year Business Plan that will enable clearer spend decisions; strengthening capital delegations to allow higher value…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The programme end-date at 25/26-Q4 is 05/04/2046. The NHP continues to work closely with Trusts to progress their schemes in line with the timelines set out in the published Plan for Implementation. The latest agreed version of the Programme Business Case was fully approved in February 2025; the Hospital 2.0 standardised system is well advanced; and the Hospital 2.0 Alliance procurement has been concluded successfully. The hospitals that are being replaced due to being constructed wholly or mostly from Reinforced Autoclaved Aerated Concrete (RAAC) remain a programme priority.","narrativeClaimKind":null,"history":[{"id":"DHSC_0066_2021-Q2","year":2021,"name":"New Hospital Programme","department":"DHSC","category":"Infrastructure and Construction","description":"Through the delivery of 48 new NHS hospitals, The New Hospital Programme (NHP) aims to transform the delivery of national healthcare infrastructure across the NHS to provide world leading experiences for as many patients and staff as possible.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber/red.This is primarily due to the following factors: The feedback from the AAP review acknowledging the significant progress that the programme team have made to set this complex programme up properly with robust governance is very welcome, as is the recognition that the programme is still in the discovery phase. The Delivery Confidence Assessment of Amber, in line with the new 3 tier rating system, is one that I agree with, and I recognise that there is still much work to do. The next Gateway 0 Review this summer will be an opportunity to demonstrate further progress against the IPA's recommendations, including the latest work on the programme's delivery strategy and how the operating model will support it. It is pleasing to read that there are no urgent recommendations but an acceptance that the programme team are working through in order of priority the remaining recommendations from the gateway review and that the level of progress has been reviewed as appropriate","startDate":"2020-01-01","endDate":"2030-12-31","scheduleNarrative":"The project end-date is 31 December 2030. This is primarily due to the following factors: The Government announced the date in September 2019. There is no change to the scheduled project end date","fyBaseline":0.0,"fyForecast":749.48,"fyVariance":null,"varianceNarrative":"The GMPP project did not provide data","wholeLifeCost":0.0,"costNarrative":"The Government confirmed that 40 new hospitals will be built by 2030 and released �3.7bn of initial capital funding to support activity between April 2021 and March 2025. In addition, the Prime Minister announced an open competition for 8 further schemes to be built by 2030. We are still in discussion with HMT about whole life costs, as the programme does not yet have a confirmed funding envelope beyond 2025.","benefits":null,"benefitsNarrative":"","themes":["Delivery & schedule","Governance & assurance","Cost & funding","Technical & integration"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber/red.This is primarily due to the following factors: The feedback from the AAP review acknowledging the significant progress that the programme team have made to set this complex programme up properly with robust governance is very welcome, as is the recognition that the…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project end-date is 31 December 2030. This is primarily due to the following factors: The Government announced the date in September 2019. There is no change to the scheduled project end date","narrativeClaimKind":null},{"id":"DHSC_0066_2021-Q2","year":2022,"name":"New Hospital Programme","department":"DHSC","category":"Infrastructure and Construction","description":"The Government confirmed that 40 new hospitals will be built by 2030 and released £3.7bn of initial capital funding to support activity between April 2021 and March 2025. This includes 8 previously announced schemes. In addition, the Prime Minister announced an open competition for 8 further schemes to be built by 2030. This will mean 48 hospitals delivered by the end of the decade.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 decreased from Red to Amber It is pleasing to read that a number of recommendations have been closed from the gateway review held in July 2021 and that the level of progress has been reviewed as appropriate","startDate":"2021-01-01","endDate":"2030-12-31","scheduleNarrative":"Early planning GMPP project (The project has not yet passed SOC, or its programme equivalent)","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Early planning GMPP project (The project has not yet passed SOC, or its programme equivalent)","wholeLifeCost":null,"costNarrative":"Early planning GMPP project (The project has not yet passed SOC, or its programme equivalent)","benefits":null,"benefitsNarrative":"","themes":["Delivery & schedule","Cost & funding","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 decreased from Red to Amber It is pleasing to read that a number of recommendations have been closed from the gateway review held in July 2021 and that the level of progress has been reviewed as appropriate Early planning GMPP…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Early planning GMPP project (The project has not yet passed SOC, or its programme equivalent)","narrativeClaimKind":null},{"id":"DHSC_0066_2021-Q2","year":2023,"name":"New Hospital Programme","department":"DHSC","category":"Infrastructure and Construction","description":"The Government confirmed that 40 new hospitals will be built by 2030 and released 3.7bn of initial capital funding to support activity between April 2021 and March 2025. This includes 8 previously announced schemes. In addition, the Prime Minister announced an open competition for 8 further schemes to be built by 2030. This will mean 48 hospitals delivered by the end of the decade","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Early planning GMPP project (The project has not yet passed SOC, or its programme equivalent)","startDate":null,"endDate":null,"scheduleNarrative":"Early planning GMPP project (The project has not yet passed SOC, or its programme equivalent)","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Early planning GMPP project (The project has not yet passed SOC, or its programme equivalent)","wholeLifeCost":null,"costNarrative":"Early planning GMPP project (The project has not yet passed SOC, or its programme equivalent)","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. The project did not provide departmental-agree monetised benefits at 22/23-Q4.The project did not provide departmental-agree monetised benefits at 22/23-Q4.The project did not provide departmental-agree monetised benefits at 22/23-Q4.","themes":[],"evidenceExcerpt":"Early planning GMPP project (The project has not yet passed SOC, or its programme equivalent) Early planning GMPP project (The project has not yet passed SOC, or its programme equivalent)","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Early planning GMPP project (The project has not yet passed SOC, or its programme equivalent)","narrativeClaimKind":null},{"id":"DHSC_0066_2021-Q2","year":2024,"name":"New Hospital Programme","department":"DHSC","category":"Infrastructure and Construction","description":"In May 2023, the Government confirmed that the New Hospital Programme was expected to be backed by over 20 billion of investment in hospital infrastructure to transform how critical national health infrastructure is delivered . This included a commitment to rebuilding five additional NHS hospitals constructed mostly using Reinforced Autoclaved Aerated Concrete and a future rolling programme of capital investment in hospital infrastructure to secure the building of new hospitals beyond 2030.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Red. This is primarily due to the following factors. The IPA PAR review was held in April 2024, prior to approval of the Programme Business Case, 5 recommendations were issued along with the red Rating. Despite the rating, NHP were supported in proceeding to MPRG, which was held on 30 April 2024, in recognition of the enormous effort from the programme team and the criticality of the programme and the need to maintain delivery momentum. This is a complex programme with a number of external pressures related to it. We recognise and are taking action to address concerns raised and engaging proactively both within the programme and across Government, the stakeholder landscape, supplier base, to identify, build in best practice and embed the broad support for this work. NHP have a further IPA review in July where the delivery confidence rating will be reassessed.","startDate":"2021-01-01","endDate":"2030-12-31","scheduleNarrative":"The project's end-date at 23/24-Q4 is 2030-12-31. This is primarily due to the following factors.","fyBaseline":870.0,"fyForecast":411.0,"fyVariance":-53.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The GMPP project did not provide narrative","wholeLifeCost":3690.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 23/24-Q4 is 3690m. This is primarily due to the following factors.","benefits":0.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 0m.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Red. This is primarily due to the following factors. The IPA PAR review was held in April 2024, prior to approval of the Programme Business Case, 5 recommendations were issued along with the red Rating. Despite the rating, NHP were supported in proceeding to MPRG,…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 23/24-Q4 is 2030-12-31. This is primarily due to the following factors.","narrativeClaimKind":null},{"id":"DHSC_0066_2021-Q2","year":2025,"name":"NEW HOSPITAL PROGRAMME","department":"DHSC","category":"Infrastructure and Construction","description":"The New Hospital Programme was set up in October 2020 to deliver a combination of health, infrastructure and major programme capital delivery. The New Hospital Programme incorporated 46 hospital schemes, which includes the replacement of seven hospitals built wholly or mostly from Reinforced Autoclaved Aerated Concrete (RAAC).","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 has improved to AMBER. This is primarily due to the following factors‚ Following the New Hospital Programme (NHP) Review, we now have an agreed, realistic implementation plan, together with agreed changes to funding to the waves approach. NHP also appointed the Programme Delivery Partner (known as Health Delivery Partnership) on 1 April 2025.","startDate":"2021-01-01","endDate":"2046-04-05","scheduleNarrative":"The project's end-date at 24/25-Q4 is 05/04/2046. This is primarily due to the following factors‚ The New Hospital Programme (NHP) is currently reporting delivery as on-track against the schedule published in the Plan for Implementation. The latest agreed version of the Programme Business Case was fully approved in February 2025, the Hospital 2.0 standardised system is well advanced, and the Hospital 2.0 Alliance procurement is progressing well. The hospitals that are being replaced due to being constructed wholly or mostly from Reinforced Autoclaved Aerated Concrete (RAAC) remain a programme priority.","fyBaseline":1660.0,"fyForecast":762.0,"fyVariance":54.1,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The baseline for the financial year 24/25 was set as part of the last Spending Review (SR20). The SR20 budget was developed pre-NHP, before the programmatic approach and the development of Hospital 2.0 system. The programmatic approach allows most of the design activity to take place centrally, reducing the level of spend in the early years.","wholeLifeCost":60008.0,"costNarrative":"The project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) is 60,008. This is primarily due to the following factors Whole Life Costs do not include Pre-programme expenditure, or BAU running costs for each project. This will be assessed via individual business cases and funded over the lifetime of the asset. Whole Life Costs are now based on the latest agreed Programme Business Case, which was fully approved in February 2025, and covers 46 schemes for completion by 2045/46.","benefits":59000.0,"benefitsNarrative":"The project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) is 59,000. This is primarily due to the following factors‚ This is now based on the latest agreed Programme Business Case, which was fully approved in February 2025. It includes efficiency benefits in nominal terms over 60 years post construction and inflates this by a rate of 2%. This considers cash releasing and non-cash releasing efficiency benefits, but not societal benefits as these are not counted as efficiencies.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 has improved to AMBER. This is primarily due to the following factors‚ Following the New Hospital Programme (NHP) Review, we now have an agreed, realistic implementation plan, together with agreed changes to funding to the waves…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":true,"narrativeExcerpt":"The project's end-date at 24/25-Q4 is 05/04/2046. This is primarily due to the following factors‚ The New Hospital Programme (NHP) is currently reporting delivery as on-track against the schedule published in the Plan for Implementation. The latest agreed version of the Programme Business Case was fully approved in February 2025, the Hospital 2.0 standardised system is well advanced, and the Hospital 2.0 Alliance procurement is progressing well. The hospitals that are being replaced due to being constructed wholly or mostly from Reinforced Autoclaved Aerated Concrete (RAAC) remain a programme priority.","narrativeClaimKind":"says-unchanged"},{"id":"DHSC_0066_2021-Q2","year":2026,"name":"NEW HOSPITAL PROGRAMME","department":"DHSC","category":"Infrastructure and Construction","description":"The New Hospital Programme was set up in October 2020 to deliver a combination of health, infrastructure and major programme capital delivery. The New Hospital Programme incorporated 46 hospital schemes, which includes the replacement of seven hospitals built wholly or mostly from Reinforced Autoclaved Aerated Concrete (RAAC).","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"As with financial year 24/25-Q4, NISTA’s Delivery Confidence Assessment rating at 25/26-Q4 remained at AMBER. This is primarily due to the following factors which have strengthened governance and assurance: working towards finalising a three-year Business Plan that will enable clearer spend decisions; strengthening capital delegations to allow higher value business case approvals e.g. for enabling works; strengthening governance and assurance; and prioritising recruitment to senior delivery team roles. The procurement of the Hospital 2.0 Alliance (H2A) was successfully completed, with the H2A Framework and Alliance Joining Agreements fully executed.","startDate":"2021-01-01","endDate":"2046-04-05","scheduleNarrative":"The programme end-date at 25/26-Q4 is 05/04/2046. The NHP continues to work closely with Trusts to progress their schemes in line with the timelines set out in the published Plan for Implementation. The latest agreed version of the Programme Business Case was fully approved in February 2025; the Hospital 2.0 standardised system is well advanced; and the Hospital 2.0 Alliance procurement has been concluded successfully. The hospitals that are being replaced due to being constructed wholly or mostly from Reinforced Autoclaved Aerated Concrete (RAAC) remain a programme priority.","fyBaseline":931.81,"fyForecast":708.06,"fyVariance":24.01,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The scheme budgets in the SR were established during the NHP review, we have seen some slippage during 2025/26 and are working to get spend back on track over the course of the Spending Review period","wholeLifeCost":47523.91,"costNarrative":"The project's departmentally agreed Whole Life Cost at 25/26-Q4 remained at the same level as 24/25. This is primarily due to the following factors Whole Life Costs do not include Pre-programme expenditure, or BAU running costs for each project. This will be assessed via individual business cases and funded over the lifetime of the asset. Whole Life Costs are now based on the latest agreed Programme Business Case, which was fully approved in February 2025, and covers 46 schemes for completion by 2045/46.","benefits":59407.0,"benefitsNarrative":"The project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained as per 24/25. This is primarily due to the following factors‚ This is now based on the latest agreed Programme Business Case, which was fully approved in February 2025. It includes efficiency benefits in nominal terms over 60 years post construction and inflates this by a rate of 2%. This considers cash releasing and non-cash releasing efficiency benefits, but not societal benefits as these are not counted as efficiencies.","themes":["Cost & funding","Governance & assurance","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"As with financial year 24/25-Q4, NISTA’s Delivery Confidence Assessment rating at 25/26-Q4 remained at AMBER. This is primarily due to the following factors which have strengthened governance and assurance: working towards finalising a three-year Business Plan that will enable clearer spend decisions; strengthening capital delegations to allow higher value…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The programme end-date at 25/26-Q4 is 05/04/2046. The NHP continues to work closely with Trusts to progress their schemes in line with the timelines set out in the published Plan for Implementation. The latest agreed version of the Programme Business Case was fully approved in February 2025; the Hospital 2.0 standardised system is well advanced; and the Hospital 2.0 Alliance procurement has been concluded successfully. The hospitals that are being replaced due to being constructed wholly or mostly from Reinforced Autoclaved Aerated Concrete (RAAC) remain a programme priority.","narrativeClaimKind":null}],"previous":{"id":"DHSC_0066_2021-Q2","year":2025,"name":"NEW HOSPITAL PROGRAMME","department":"DHSC","category":"Infrastructure and Construction","description":"The New Hospital Programme was set up in October 2020 to deliver a combination of health, infrastructure and major programme capital delivery. The New Hospital Programme incorporated 46 hospital schemes, which includes the replacement of seven hospitals built wholly or mostly from Reinforced Autoclaved Aerated Concrete (RAAC).","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 has improved to AMBER. This is primarily due to the following factors‚ Following the New Hospital Programme (NHP) Review, we now have an agreed, realistic implementation plan, together with agreed changes to funding to the waves approach. NHP also appointed the Programme Delivery Partner (known as Health Delivery Partnership) on 1 April 2025.","startDate":"2021-01-01","endDate":"2046-04-05","scheduleNarrative":"The project's end-date at 24/25-Q4 is 05/04/2046. This is primarily due to the following factors‚ The New Hospital Programme (NHP) is currently reporting delivery as on-track against the schedule published in the Plan for Implementation. The latest agreed version of the Programme Business Case was fully approved in February 2025, the Hospital 2.0 standardised system is well advanced, and the Hospital 2.0 Alliance procurement is progressing well. The hospitals that are being replaced due to being constructed wholly or mostly from Reinforced Autoclaved Aerated Concrete (RAAC) remain a programme priority.","fyBaseline":1660.0,"fyForecast":762.0,"fyVariance":54.1,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The baseline for the financial year 24/25 was set as part of the last Spending Review (SR20). The SR20 budget was developed pre-NHP, before the programmatic approach and the development of Hospital 2.0 system. The programmatic approach allows most of the design activity to take place centrally, reducing the level of spend in the early years.","wholeLifeCost":60008.0,"costNarrative":"The project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) is 60,008. This is primarily due to the following factors Whole Life Costs do not include Pre-programme expenditure, or BAU running costs for each project. This will be assessed via individual business cases and funded over the lifetime of the asset. Whole Life Costs are now based on the latest agreed Programme Business Case, which was fully approved in February 2025, and covers 46 schemes for completion by 2045/46.","benefits":59000.0,"benefitsNarrative":"The project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) is 59,000. This is primarily due to the following factors‚ This is now based on the latest agreed Programme Business Case, which was fully approved in February 2025. It includes efficiency benefits in nominal terms over 60 years post construction and inflates this by a rate of 2%. This considers cash releasing and non-cash releasing efficiency benefits, but not societal benefits as these are not counted as efficiencies.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 has improved to AMBER. This is primarily due to the following factors‚ Following the New Hospital Programme (NHP) Review, we now have an agreed, realistic implementation plan, together with agreed changes to funding to the waves…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":true,"narrativeExcerpt":"The project's end-date at 24/25-Q4 is 05/04/2046. This is primarily due to the following factors‚ The New Hospital Programme (NHP) is currently reporting delivery as on-track against the schedule published in the Plan for Implementation. The latest agreed version of the Programme Business Case was fully approved in February 2025, the Hospital 2.0 standardised system is well advanced, and the Hospital 2.0 Alliance procurement is progressing well. The hospitals that are being replaced due to being constructed wholly or mostly from Reinforced Autoclaved Aerated Concrete (RAAC) remain a programme priority.","narrativeClaimKind":"says-unchanged"},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":0,"attentionScore":26,"attentionReasons":["Current published delivery confidence is Amber","In-year forecast variance is +24.0%"]},{"id":"MOD_0007_2122-Q2","year":2026,"name":"SUBMERSIBLE SHIP NUCLEAR AUKUS","department":"MOD","category":"Military Capability","description":"SSN-AUKUS is a new class of nuclear-powered, conventionally armed attack submarine being developed in partnership with the US and Australia for the Royal Navy and Royal Australian Navy. The design and manufacturing process will be a complex, multi-decade undertaking, creating thousands of jobs across the UK. Construction of the UK’s submarines will take place principally at BAE Systems’ Barrow shipyard, with the manufacture of the next generation of nuclear reactors, including reactors for Australia’s SSN-AUKUS submarines, taking place at Rolls-Royce Submarines Ltd in Raynesway. SSN-AUKUS will enable deeper information and technology sharing and closer integration of security and defence-related science and technology, including propulsion plant systems, common vertical launch systems and conventional weapons from the US. They will be operational from the late 2030s, replacing the current SSN Astute Class.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors. 1. Rreflects the ongoing focus on enhancing supplier infrastructure to strengthen capability and capacity within the tier 1 and subordinate supply chain for SSN AUKUS. 2. Additionally, efforts continue to address the current shortfall in engineering resource to support the effective management and assurance of the submarine’s design.","startDate":"2014-04-01","endDate":"2043-04-30","scheduleNarrative":"Exempt under Section 24 - National security","fyBaseline":24.0,"fyForecast":24.0,"fyVariance":24.0,"varianceNarrative":"Exempt under Section 24 – National Security​","wholeLifeCost":null,"costNarrative":"Exempt under Section 35 - Formulation of government policy","benefits":null,"benefitsNarrative":"Compared to financial year 2024/25-Q4, the project's departmental-agreed monetised benefits at 2025/26-Q4 remained at £0m.","themes":["Workforce & capability","Commercial & supply chain","Governance & assurance","Cost & funding"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors. 1. Rreflects the ongoing focus on enhancing supplier infrastructure to strengthen capability and capacity within the tier 1 and subordinate supply chain for SSN AUKUS. 2. Additionally,…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 24 - National security","narrativeClaimKind":null,"history":[{"id":"MOD_0007_2122-Q2","year":2023,"name":"Submersible Ship Nuclear AUKUS","department":"MOD","category":"Military Capability","description":"In March 2021 the UK Government committed to funding of this next generation of submarines, with the programme becoming known as Ship Submersible Nuclear (Replacement). The programmes aim is to deliver the next generation of Royal Navy submarines. The intial design work will inform a future decision to define the replacement for the Astute Class submarines - the nuclear-powered fleet of submarines currently in service with the Royal Navy.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 is Amber. This is primarily due to the following factors. Significant challenges at this early stage of the programme, some outside the control of the programme. Progress has been made, but negotiations with the suppliers have been more protracted than anticipated.","startDate":"2014-04-01","endDate":null,"scheduleNarrative":"The project's end-date at 22/23-Q4 is currently undefined. This is primarily due to the programme being in its Programme Definition Phase until 31/03/2023. Therefore, the programme's strategic milestones, detailed programme schedule and end-date are not possible to define.","fyBaseline":188.87,"fyForecast":179.81,"fyVariance":-5.0,"varianceNarrative":"The budget variance is less than or equal to 5%","wholeLifeCost":null,"costNarrative":"Exempt under Section 27 of the Freedom of Information Act 2000 (International Relations)","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This programme does not report cashable benefits. Its aim is to provision the armed forces with the equipment and / or infrastructure required.","themes":["Delivery & schedule","Cost & funding"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 is Amber. This is primarily due to the following factors. Significant challenges at this early stage of the programme, some outside the control of the programme. Progress has been made, but negotiations with the suppliers have been more protracted than anticipated. The…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 22/23-Q4 is currently undefined. This is primarily due to the programme being in its Programme Definition Phase until 31/03/2023. Therefore, the programme's strategic milestones, detailed programme schedule and end-date are not possible to define.","narrativeClaimKind":null},{"id":"MOD_0007_2122-Q2","year":2024,"name":"Submersible Ship Nuclear AUKUS","department":"MOD","category":"Military Capability","description":"SSN-AUKUS is a new class of nuclear-powered, conventionally armed attack submarine being developed in partnership with the US and Australia for the Royal Navy and Royal Australian Navy. The design and manufacturing process will be a complex, multi-decade undertaking, creating thousands of jobs across the UK. SSN-AUKUS will enable deeper information and technology sharing and closer integration of security and defence-related science and technology, including propulsion plant systems, common vertical launch systems and conventional weapons from the US. They will be operational from the late 2030s, replacing the current SSN Astute Class.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. A degree of risk relating to the ability of the Defence Nuclear Enterprise and the wider UK supply chain to resource the programme with the necessary skills, experience and infrastructure to deliver against a demanding schedule, without adversely impacting the delivery of the Dreadnought (SSBN) programme.","startDate":"2014-04-01","endDate":null,"scheduleNarrative":"The SSN-AUKUS programme is in its early stages and is working to a schedule developed in conjunction with Industrial Partners.","fyBaseline":463.64,"fyForecast":494.67,"fyVariance":6.693,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. A result of unanticipated costs due to the insertion of US Technology. This opportunity arose as a result of the AUKUS agreement at the start of the financial year.","wholeLifeCost":null,"costNarrative":"Exempt under Section 27 of the Freedom of Information Act 2000 (International Relations)","benefits":0.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 0m.","themes":["Delivery & schedule","Cost & funding","Workforce & capability","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. A degree of risk relating to the ability of the Defence Nuclear Enterprise and the wider UK supply chain to resource the programme with the necessary skills, experience and…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The SSN-AUKUS programme is in its early stages and is working to a schedule developed in conjunction with Industrial Partners.","narrativeClaimKind":null},{"id":"MOD_0007_2122-Q2","year":2025,"name":"SUBMERSIBLE SHIP NUCLEAR AUKUS","department":"MoD","category":"Military Capability","description":"SSN-AUKUS is a new class of nuclear-powered, conventionally armed attack submarine being developed in partnership with the US and Australia for the Royal Navy and Royal Australian Navy. The design and manufacturing process will be a complex, multi-decade undertaking, creating thousands of jobs across the UK. Construction of the UK’s submarines will take place principally at BAE Systems’ Barrow shipyard, with the manufacture of the next generation of nuclear reactors, including reactors for Australia’s SSN-AUKUS submarines, taking place at Rolls-Royce Submarines Ltd in Raynesway. SSN-AUKUS will enable deeper information and technology sharing and closer integration of security and defence-related science and technology, including propulsion plant systems, common vertical launch systems and conventional weapons from the US. They will be operational from the late 2030s, replacing the current SSN Astute Class.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER, compared with the project's assessment last year of AMBER. This is due to the following factors. SSN AUKUS has a critical dependency on supplier infrastructure, which needs to be enhanced, to deliver capability and capacity within the tier 1 and subordinate supply chain. In addition, there continues to be a shortfall of engineering resource to progress the overall management and assurance of the submarine’s design.","startDate":"2014-04-01","endDate":null,"scheduleNarrative":"Section 24 - National security, Section 26 - Defence","fyBaseline":614.88,"fyForecast":447.83,"fyVariance":27.17,"varianceNarrative":"Section 24 - National security, Section 26 - Defence","wholeLifeCost":null,"costNarrative":"Section 35 - Formulation of government policy","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits","themes":["Workforce & capability","Commercial & supply chain","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER, compared with the project's assessment last year of AMBER. This is due to the following factors. SSN AUKUS has a critical dependency on supplier infrastructure, which needs to be enhanced, to deliver capability and capacity within the tier 1 and subordinate…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Section 24 - National security, Section 26 - Defence","narrativeClaimKind":null},{"id":"MOD_0007_2122-Q2","year":2026,"name":"SUBMERSIBLE SHIP NUCLEAR AUKUS","department":"MOD","category":"Military Capability","description":"SSN-AUKUS is a new class of nuclear-powered, conventionally armed attack submarine being developed in partnership with the US and Australia for the Royal Navy and Royal Australian Navy. The design and manufacturing process will be a complex, multi-decade undertaking, creating thousands of jobs across the UK. Construction of the UK’s submarines will take place principally at BAE Systems’ Barrow shipyard, with the manufacture of the next generation of nuclear reactors, including reactors for Australia’s SSN-AUKUS submarines, taking place at Rolls-Royce Submarines Ltd in Raynesway. SSN-AUKUS will enable deeper information and technology sharing and closer integration of security and defence-related science and technology, including propulsion plant systems, common vertical launch systems and conventional weapons from the US. They will be operational from the late 2030s, replacing the current SSN Astute Class.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors. 1. Rreflects the ongoing focus on enhancing supplier infrastructure to strengthen capability and capacity within the tier 1 and subordinate supply chain for SSN AUKUS. 2. Additionally, efforts continue to address the current shortfall in engineering resource to support the effective management and assurance of the submarine’s design.","startDate":"2014-04-01","endDate":"2043-04-30","scheduleNarrative":"Exempt under Section 24 - National security","fyBaseline":24.0,"fyForecast":24.0,"fyVariance":24.0,"varianceNarrative":"Exempt under Section 24 – National Security​","wholeLifeCost":null,"costNarrative":"Exempt under Section 35 - Formulation of government policy","benefits":null,"benefitsNarrative":"Compared to financial year 2024/25-Q4, the project's departmental-agreed monetised benefits at 2025/26-Q4 remained at £0m.","themes":["Workforce & capability","Commercial & supply chain","Governance & assurance","Cost & funding"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors. 1. Rreflects the ongoing focus on enhancing supplier infrastructure to strengthen capability and capacity within the tier 1 and subordinate supply chain for SSN AUKUS. 2. Additionally,…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 24 - National security","narrativeClaimKind":null}],"previous":{"id":"MOD_0007_2122-Q2","year":2025,"name":"SUBMERSIBLE SHIP NUCLEAR AUKUS","department":"MoD","category":"Military Capability","description":"SSN-AUKUS is a new class of nuclear-powered, conventionally armed attack submarine being developed in partnership with the US and Australia for the Royal Navy and Royal Australian Navy. The design and manufacturing process will be a complex, multi-decade undertaking, creating thousands of jobs across the UK. Construction of the UK’s submarines will take place principally at BAE Systems’ Barrow shipyard, with the manufacture of the next generation of nuclear reactors, including reactors for Australia’s SSN-AUKUS submarines, taking place at Rolls-Royce Submarines Ltd in Raynesway. SSN-AUKUS will enable deeper information and technology sharing and closer integration of security and defence-related science and technology, including propulsion plant systems, common vertical launch systems and conventional weapons from the US. They will be operational from the late 2030s, replacing the current SSN Astute Class.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER, compared with the project's assessment last year of AMBER. This is due to the following factors. SSN AUKUS has a critical dependency on supplier infrastructure, which needs to be enhanced, to deliver capability and capacity within the tier 1 and subordinate supply chain. In addition, there continues to be a shortfall of engineering resource to progress the overall management and assurance of the submarine’s design.","startDate":"2014-04-01","endDate":null,"scheduleNarrative":"Section 24 - National security, Section 26 - Defence","fyBaseline":614.88,"fyForecast":447.83,"fyVariance":27.17,"varianceNarrative":"Section 24 - National security, Section 26 - Defence","wholeLifeCost":null,"costNarrative":"Section 35 - Formulation of government policy","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits","themes":["Workforce & capability","Commercial & supply chain","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER, compared with the project's assessment last year of AMBER. This is due to the following factors. SSN AUKUS has a critical dependency on supplier infrastructure, which needs to be enhanced, to deliver capability and capacity within the tier 1 and subordinate…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Section 24 - National security, Section 26 - Defence","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":null,"attentionScore":26,"attentionReasons":["Current published delivery confidence is Amber","In-year forecast variance is +24.0%"]},{"id":"HMRC_0292_2324-Q3","year":2026,"name":"ENTERPRISE TAX MANAGEMENT PLATFORM (ETMP)","department":"HMRC","category":"Government Transformation and Service Delivery","description":"Enterprise Tax Management Platform Regeneration is a multi-year programme, established to modernise and protect the backbone of the HMRC tax accounting and payment capability. It will exploit new technology to enable better performance, improved user experience and innovation of our business processes to reduce cost and increase compliance revenue.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Programme Delivery Confidence Assessment remains Amber, with an improving trajectory and outlook as the Programme's commercial strategy implementation reaches conclusion. In December 25, the Programme awarded a contract to SAP for the provision of Enterprise Tax Management Platform (ETMP) software for the next 10-15 years and the Programme remains on track to appoint a Migration Delivery Partner in May 26. Migration enablement risk remains, centring around transforming the ETMP Application Programme Interface (API) landscape, how the applications interact with each other and reducing the size of the current platform. A Benefits Realisation plan alongside a business change strategy for the programme is maturing alongside identification of opportunities to reduce the delivery costs and will be presented in the next iteration of the Programme Business Case.","startDate":"2022-07-29","endDate":"2030-05-31","scheduleNarrative":"Compared to financial year 24/25-Q4 the project's end date at 25/26 has increased to 31/05/2030 due to delivery of 12 months Hypercare which is a period of heightened support following go-live.","fyBaseline":22.47,"fyForecast":19.64,"fyVariance":12.61,"varianceNarrative":"The GMPP Q4 and Annual Report are not directly comparable because they use different reference points (Baseline, Forecast, and Budget). Using the Business Case baseline (£22.6m) shows a larger variance, while using the actual budget (£21m) reduces the variance to under 5%.","wholeLifeCost":480.87,"costNarrative":"Compared to the 2024/25 financial year, the departmentally agreed Whole Life Costs range, approved by TAP (Treasury Approval Point) in November 2025, is £453m - £537m. The increase in costs is primarily driven by an increase in SAP contract duration (from 8-10 years) and a more mature understanding of the scope being delivered across SAP, HMRC and the future Migration Delivery Partner.","benefits":42.09,"benefitsNarrative":"The previous version of Programme Business Case, approved in May 2024, was based upon an 8-year contract duration, projected whole life costs of £444m. We are reporting benefits of £47m but anticipate these will increase over time to £116m. The key benefit of this Programme is protecting this vital piece of critical national infrastructure which secures over £800bn of tax per year of tax.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"The Programme Delivery Confidence Assessment remains Amber, with an improving trajectory and outlook as the Programme's commercial strategy implementation reaches conclusion. In December 25, the Programme awarded a contract to SAP for the provision of Enterprise Tax Management Platform (ETMP) software for the next 10-15 years and the Programme remains on…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4 the project's end date at 25/26 has increased to 31/05/2030 due to delivery of 12 months Hypercare which is a period of heightened support following go-live.","narrativeClaimKind":null,"history":[{"id":"HMRC_0292_2324-Q3","year":2024,"name":"Enterprise Tax Management Platform (ETMP)","department":"HMRC","category":"Government Transformation and Service Delivery","description":"The Enterprise Tax Management Platform (ETMP) Regeneration is a multi-year programme, established to lead HMRC's response to the announced end of mainstream support for the software product that underpins ETMP It's secondary objective is to address key challenges identified with the current platform. The programme will modernise and protect ETMP, the backbone of the HMRC tax accounting and payment capability. It will exploit new technology to enable better performance, improved user experience and innovation of our business processes to reduce cost and increase compliance and revenue._x000D_ The programme will regenerate ETMP, focusing on how the platform can deliver better business value through migration to a modern software product in the long term and through continuous improvement to the functionality of the current platform in the short term.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. The Amber status is due to the programme not yet having decided on the preferred option for delivery and wider understanding of the migration approach. Alongside this there are capability, capacity and whole cost funding concerns. These concerns are being explored through the department's business planning process for 2024/25. In the meantime, regeneration activity for ETMP has delivered for 2023/24 with plans in place to continue during 2024/25.","startDate":"2022-07-29","endDate":"2030-03-31","scheduleNarrative":"The project's end-date at 23/24-Q4 is 2030-03-31. This is primarily due to the following factors. The programme is made up of two elements, addressing the key concerns with the current platform and to determine the preferred option for delivery, as the current provider is ending mainstream support in 2027. Discussion around the preferred option for delivery continue and the outcome will be included in revised plans and it is expected that the programme will complete by 31st March 2030.","fyBaseline":12.51,"fyForecast":10.47,"fyVariance":-16.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The variance is due to the underspend in budget driven partly by uncertainties during the year on the strategic approach and supplier capacity issues that restricted the work that could be carried out.","wholeLifeCost":290.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 23/24-Q4 is 290m. This is primarily due to the following factors. The whole lifecycle costs are made of programme development (Information Technology (IT)) costs. Programme paybill and overhead costs for the period 2022/23 to 2029/30.","benefits":55.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 55m. Whilst potential benefits have been identified for migration, until the preferred option for delivery has been ascertained, these have yet to be quantified. Priority project benefits identified for 2024/25 are in the process of being ratified.","themes":["Cost & funding","Delivery & schedule","Workforce & capability","Technical & integration"],"evidenceExcerpt":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. The Amber status is due to the programme not yet having decided on the preferred option for delivery and wider understanding of the migration approach. Alongside this there are capability, capacity and whole cost funding…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 23/24-Q4 is 2030-03-31. This is primarily due to the following factors. The programme is made up of two elements, addressing the key concerns with the current platform and to determine the preferred option for delivery, as the current provider is ending mainstream support in 2027. Discussion around the preferred option for delivery continue and the outcome will be included in revised plans and it is expected that the programme will complete by 31st March 2030.","narrativeClaimKind":null},{"id":"HMRC_0292_2324-Q3","year":2025,"name":"ENTERPRISE TAX MANAGEMENT PLATFORM (ETMP)","department":"HMRC","category":"Government Transformation and Service Delivery","description":"The Enterprise Tax Management Platform (ETMP) Regeneration is a multi-year programme, established to modernise and protect the backbone of the HMRC tax accounting and payment capability. It will exploit new technology to enable better performance, improved user experience and innovation of our business processes to reduce cost and increase compliance and revenue.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors; This is primarily due to the Low-medium maturity of the integrated Programme schedule, to demonstrate confidence of achieving a safe and technically compliant transition to new capabilities by the end of the extended support period (include date). The high complexity and low-medium maturity of the Programme delivery and procurement strategy which will require a multi-vendor approach and niche subject matter expertise in both client side and delivery partner capability. There are also multiple high risk areas centring around the technical enablement and migration, with an improving trajectory and medium maturity of pipeline projects to improve the current service during 25/26. These factors combined give an SRO confidence assessment of Amber.","startDate":"2022-07-29","endDate":"2030-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained the same at 31/03/2030. The programme's end-date remains at 24/25-Q4, 31 March 2030.","fyBaseline":10.0,"fyForecast":9.28,"fyVariance":7.2,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The variance is partly due to delays to approving the Procurement strategy which was impacted by the pre election period and change in Government after the General Election in July 24 combined with and lower than expected supplier costs.","wholeLifeCost":443.9,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 290 to 443.9. This is primarily due to the following factors‚ The previous version of this document estimated whole life costs of £290m for migration for the preferred option. Since then, further work has been carried out to review assumptions and delivery costs in partnership with SAP and Deloitte, which has seen the WLC increase to £443.9m.","benefits":21.18,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) decreased from 55 to 21. This is primarily due to the following factors‚ Our understanding of potential benefits is still maturing and working with business owners and SAP we have started to set out an outline of expected benefits using benchmarked improvements from SAP created using an analysis of other organisations that have migrated to the new platform.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Technical & integration"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors; This is primarily due to the Low-medium maturity of the integrated Programme schedule, to demonstrate confidence of achieving a safe and technically compliant…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained the same at 31/03/2030. The programme's end-date remains at 24/25-Q4, 31 March 2030.","narrativeClaimKind":null},{"id":"HMRC_0292_2324-Q3","year":2026,"name":"ENTERPRISE TAX MANAGEMENT PLATFORM (ETMP)","department":"HMRC","category":"Government Transformation and Service Delivery","description":"Enterprise Tax Management Platform Regeneration is a multi-year programme, established to modernise and protect the backbone of the HMRC tax accounting and payment capability. It will exploit new technology to enable better performance, improved user experience and innovation of our business processes to reduce cost and increase compliance revenue.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Programme Delivery Confidence Assessment remains Amber, with an improving trajectory and outlook as the Programme's commercial strategy implementation reaches conclusion. In December 25, the Programme awarded a contract to SAP for the provision of Enterprise Tax Management Platform (ETMP) software for the next 10-15 years and the Programme remains on track to appoint a Migration Delivery Partner in May 26. Migration enablement risk remains, centring around transforming the ETMP Application Programme Interface (API) landscape, how the applications interact with each other and reducing the size of the current platform. A Benefits Realisation plan alongside a business change strategy for the programme is maturing alongside identification of opportunities to reduce the delivery costs and will be presented in the next iteration of the Programme Business Case.","startDate":"2022-07-29","endDate":"2030-05-31","scheduleNarrative":"Compared to financial year 24/25-Q4 the project's end date at 25/26 has increased to 31/05/2030 due to delivery of 12 months Hypercare which is a period of heightened support following go-live.","fyBaseline":22.47,"fyForecast":19.64,"fyVariance":12.61,"varianceNarrative":"The GMPP Q4 and Annual Report are not directly comparable because they use different reference points (Baseline, Forecast, and Budget). Using the Business Case baseline (£22.6m) shows a larger variance, while using the actual budget (£21m) reduces the variance to under 5%.","wholeLifeCost":480.87,"costNarrative":"Compared to the 2024/25 financial year, the departmentally agreed Whole Life Costs range, approved by TAP (Treasury Approval Point) in November 2025, is £453m - £537m. The increase in costs is primarily driven by an increase in SAP contract duration (from 8-10 years) and a more mature understanding of the scope being delivered across SAP, HMRC and the future Migration Delivery Partner.","benefits":42.09,"benefitsNarrative":"The previous version of Programme Business Case, approved in May 2024, was based upon an 8-year contract duration, projected whole life costs of £444m. We are reporting benefits of £47m but anticipate these will increase over time to £116m. The key benefit of this Programme is protecting this vital piece of critical national infrastructure which secures over £800bn of tax per year of tax.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"The Programme Delivery Confidence Assessment remains Amber, with an improving trajectory and outlook as the Programme's commercial strategy implementation reaches conclusion. In December 25, the Programme awarded a contract to SAP for the provision of Enterprise Tax Management Platform (ETMP) software for the next 10-15 years and the Programme remains on…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4 the project's end date at 25/26 has increased to 31/05/2030 due to delivery of 12 months Hypercare which is a period of heightened support following go-live.","narrativeClaimKind":null}],"previous":{"id":"HMRC_0292_2324-Q3","year":2025,"name":"ENTERPRISE TAX MANAGEMENT PLATFORM (ETMP)","department":"HMRC","category":"Government Transformation and Service Delivery","description":"The Enterprise Tax Management Platform (ETMP) Regeneration is a multi-year programme, established to modernise and protect the backbone of the HMRC tax accounting and payment capability. It will exploit new technology to enable better performance, improved user experience and innovation of our business processes to reduce cost and increase compliance and revenue.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors; This is primarily due to the Low-medium maturity of the integrated Programme schedule, to demonstrate confidence of achieving a safe and technically compliant transition to new capabilities by the end of the extended support period (include date). The high complexity and low-medium maturity of the Programme delivery and procurement strategy which will require a multi-vendor approach and niche subject matter expertise in both client side and delivery partner capability. There are also multiple high risk areas centring around the technical enablement and migration, with an improving trajectory and medium maturity of pipeline projects to improve the current service during 25/26. These factors combined give an SRO confidence assessment of Amber.","startDate":"2022-07-29","endDate":"2030-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained the same at 31/03/2030. The programme's end-date remains at 24/25-Q4, 31 March 2030.","fyBaseline":10.0,"fyForecast":9.28,"fyVariance":7.2,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The variance is partly due to delays to approving the Procurement strategy which was impacted by the pre election period and change in Government after the General Election in July 24 combined with and lower than expected supplier costs.","wholeLifeCost":443.9,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 290 to 443.9. This is primarily due to the following factors‚ The previous version of this document estimated whole life costs of £290m for migration for the preferred option. Since then, further work has been carried out to review assumptions and delivery costs in partnership with SAP and Deloitte, which has seen the WLC increase to £443.9m.","benefits":21.18,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) decreased from 55 to 21. This is primarily due to the following factors‚ Our understanding of potential benefits is still maturing and working with business owners and SAP we have started to set out an outline of expected benefits using benchmarked improvements from SAP created using an analysis of other organisations that have migrated to the new platform.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Technical & integration"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors; This is primarily due to the Low-medium maturity of the integrated Programme schedule, to demonstrate confidence of achieving a safe and technically compliant…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained the same at 31/03/2030. The programme's end-date remains at 24/25-Q4, 31 March 2030.","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":61,"attentionScore":25,"attentionReasons":["Current published delivery confidence is Amber","Published end date moved 61 days later","In-year forecast variance is +12.6%"]},{"id":"DESNZ_0472_2425-Q4","year":2026,"name":"Great British Energy","department":"DESNZ","category":"Infrastructure and Construction","description":"The aim of the GBE set up programme is to create GBE GovCo, a publicly owned energy company that will drive the deployment of clean energy, enhance energy independence, and create jobs across the UK. This aim will deliver on the Government’s Mission to establish GBE as the mechanism for delivery of the key outcomes of the GBE Programme as set out in the Labour Party 2024 UK General Election manifesto. Namely, ability to strategically invest in and own clean energy projects, foster collaboration with key stakeholders, and support local and community energy initiatives. The desired outcome of this programme is the creation of a fully functioning, independent and publicly owned energy company called Great British Energy (GBE).","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This reflects significant progress made in establishing the organisational, governance and delivery frameworks required for GBE to move towards operational independence and the closure of the set-up programme. The Programme has received CST approval for the ALB set-up Full Business Case, enabling both DESNZ and GBE to proceed with FY26/27 set-up spend. On 4 March, the programme received the Subsidy Advice Unit’s (SAU) final referral report on the Subsidy Control Assessment for GBE’s 2026–2029 activity. The SAU provided a favourable assessment, confirming that the policy objective, the rationale for using a subsidy, and the necessity of the scheme have been clearly articulated. The Aberdeen HQ remains on track to open later in 2026, and recruitment is progressing across all levels following approval of their workforce and senior pay case, and an interim leadership team in place. The first tranche of the permanent Non-Executive Director (NED) appointments is underway. GBE has made significant progress with senior recruitment, with a Local Managing Director (MD) identified and a Strategy Director appointed. Interviews for an onshore and offshore wind MD took place in May. GBE has also agreed its workforce pay case and launched a significant recruitment campaign to stabilise its workforce and increase its presence in Aberdeen. This has been supported by a recruitment event held in Aberdeen on 3 June. Across the programme, GBE has made its first supply chain investment - a £40 million equity investment in ITM Power. It has also published the Local Power Plan together with DESNZ, setting out a clear vision to transform the UK’s local and community energy sector, and made its first investment in 100MW Pentland Offshore Wind Farm alongside the National Wealth Fund and Scottish National Investment Bank. Although the programme delivery confidence assessment remains Amber, risks continue to be actively managed. The programme remains on track to implement the Sponsorship Assurance Framework and achieve closure of the set-up programme. The GBE-DESNZ Framework Document was approved and published on May 12, and their first Business Plan has been approved by DESNZ Ministers. There is a clear plan for further business case development and approval and this is being implemented with NISTA & HMT.","startDate":null,"endDate":"2026-10-30","scheduleNarrative":"Exempt under Section 22 - Information intended for future publication","fyBaseline":22.0,"fyForecast":22.0,"fyVariance":22.0,"varianceNarrative":"Exempt under Section 22 – Information intended for future publication ​","wholeLifeCost":null,"costNarrative":"Exempt under Section 22 - Information intended for future publication","benefits":null,"benefitsNarrative":"Exempt under Section 22 - Information intended for future publication","themes":["Approvals & decisions","Delivery & schedule","Workforce & capability","Cost & funding"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This reflects significant progress made in establishing the organisational, governance and delivery frameworks required for GBE to move towards operational independence and the closure of the set-up programme. The Programme has received CST…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 22 - Information intended for future publication","narrativeClaimKind":null,"history":[{"id":"DESNZ_0472_2425-Q4","year":2026,"name":"Great British Energy","department":"DESNZ","category":"Infrastructure and Construction","description":"The aim of the GBE set up programme is to create GBE GovCo, a publicly owned energy company that will drive the deployment of clean energy, enhance energy independence, and create jobs across the UK. This aim will deliver on the Government’s Mission to establish GBE as the mechanism for delivery of the key outcomes of the GBE Programme as set out in the Labour Party 2024 UK General Election manifesto. Namely, ability to strategically invest in and own clean energy projects, foster collaboration with key stakeholders, and support local and community energy initiatives. The desired outcome of this programme is the creation of a fully functioning, independent and publicly owned energy company called Great British Energy (GBE).","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This reflects significant progress made in establishing the organisational, governance and delivery frameworks required for GBE to move towards operational independence and the closure of the set-up programme. The Programme has received CST approval for the ALB set-up Full Business Case, enabling both DESNZ and GBE to proceed with FY26/27 set-up spend. On 4 March, the programme received the Subsidy Advice Unit’s (SAU) final referral report on the Subsidy Control Assessment for GBE’s 2026–2029 activity. The SAU provided a favourable assessment, confirming that the policy objective, the rationale for using a subsidy, and the necessity of the scheme have been clearly articulated. The Aberdeen HQ remains on track to open later in 2026, and recruitment is progressing across all levels following approval of their workforce and senior pay case, and an interim leadership team in place. The first tranche of the permanent Non-Executive Director (NED) appointments is underway. GBE has made significant progress with senior recruitment, with a Local Managing Director (MD) identified and a Strategy Director appointed. Interviews for an onshore and offshore wind MD took place in May. GBE has also agreed its workforce pay case and launched a significant recruitment campaign to stabilise its workforce and increase its presence in Aberdeen. This has been supported by a recruitment event held in Aberdeen on 3 June. Across the programme, GBE has made its first supply chain investment - a £40 million equity investment in ITM Power. It has also published the Local Power Plan together with DESNZ, setting out a clear vision to transform the UK’s local and community energy sector, and made its first investment in 100MW Pentland Offshore Wind Farm alongside the National Wealth Fund and Scottish National Investment Bank. Although the programme delivery confidence assessment remains Amber, risks continue to be actively managed. The programme remains on track to implement the Sponsorship Assurance Framework and achieve closure of the set-up programme. The GBE-DESNZ Framework Document was approved and published on May 12, and their first Business Plan has been approved by DESNZ Ministers. There is a clear plan for further business case development and approval and this is being implemented with NISTA & HMT.","startDate":null,"endDate":"2026-10-30","scheduleNarrative":"Exempt under Section 22 - Information intended for future publication","fyBaseline":22.0,"fyForecast":22.0,"fyVariance":22.0,"varianceNarrative":"Exempt under Section 22 – Information intended for future publication ​","wholeLifeCost":null,"costNarrative":"Exempt under Section 22 - Information intended for future publication","benefits":null,"benefitsNarrative":"Exempt under Section 22 - Information intended for future publication","themes":["Approvals & decisions","Delivery & schedule","Workforce & capability","Cost & funding"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This reflects significant progress made in establishing the organisational, governance and delivery frameworks required for GBE to move towards operational independence and the closure of the set-up programme. The Programme has received CST…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 22 - Information intended for future publication","narrativeClaimKind":null}],"previous":null,"ratingDelta":null,"transition":"Not comparable","endDateDeltaDays":null,"attentionScore":25,"attentionReasons":["Current published delivery confidence is Amber","In-year forecast variance is +22.0%"]},{"id":"DFE_0109_2223-Q1","year":2026,"name":"Lifelong Learning Entitlement","department":"DFE","category":"Government Transformation and Service Delivery","description":"The Lifelong Learning Entitlement (LLE) was announced by the then Prime Minister in 2020 and responds to recommendations in the Augar review of post-18 education and training. The LLE will deliver a transformational change to the student finance system in England, by broadening access to high-quality, flexible education and training. The LLE will launch in academic year 2026/27 for learners studying courses starting on or after 1 January 2027. From launch, it will provide individuals with a loan entitlement the equivalent to four years of full-time undergraduate tuition fees for use over their working lives to learn, upskill and retrain. Learners will be able to use this new entitlement more flexibly than ever before to fund individual modules as well as full courses at levels 4 to 6, regardless of whether they are provided in colleges, universities, or independent providers. It will create opportunities for both young people and adults to develop the skills needed to succeed in life, contributing to growth across the entire country.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Delivery confidence for 2025/26 remains Amber. The programme has made steady progress towards launch in 2026/27. The Amber rating is primarily driven by the programme’s inherent complexity, tight and inflexible legislative timelines ahead of launch, capacity pressures within delivery partners, and uneven sector readiness. These risks are ongoing and require careful management. The focus now is on delivering legislation to schedule, maintaining delivery partner capacity and strengthening engagement with providers to secure readiness. Confidence will improve if legislative milestones are met, sector preparedness becomes more consistent, and system testing remains on track. Delay in these areas will place pressure on launch plans given limited contingency.","startDate":"2020-09-30","endDate":null,"scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 has been brought forward to 31/03/27. This recognises that the LLE will launch in September 2026 for courses starting in January 2027; after that the programme will transition into BAU operational delivery structures.","fyBaseline":22.0,"fyForecast":22.0,"fyVariance":22.0,"varianceNarrative":"Exempt under Section 22 – Information intended for future publication ​","wholeLifeCost":null,"costNarrative":"Exempt under Section 22 - Information intended for future publication","benefits":null,"benefitsNarrative":"Exempt under Section 22 - Information intended for future publication","themes":["Delivery & schedule","Workforce & capability","Cost & funding","Technical & integration"],"evidenceExcerpt":"Delivery confidence for 2025/26 remains Amber. The programme has made steady progress towards launch in 2026/27. The Amber rating is primarily driven by the programme’s inherent complexity, tight and inflexible legislative timelines ahead of launch, capacity pressures within delivery partners, and uneven sector readiness. These risks are ongoing and require…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 has been brought forward to 31/03/27. This recognises that the LLE will launch in September 2026 for courses starting in January 2027; after that the programme will transition into BAU operational delivery structures.","narrativeClaimKind":null,"history":[{"id":"DFE_0109_2223-Q1","year":2023,"name":"Lifelong Loan Entitlement","department":"DFE","category":"Government Transformation and Service Delivery","description":"","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 22 of the Freedom of Information Act 2000 (Information intended for future publication)","startDate":null,"endDate":null,"scheduleNarrative":"Exempt under Section 22 of the Freedom of Information Act 2000 (Information intended for future publication)","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 22 of the Freedom of Information Act 2000 (Information intended for future publication)","wholeLifeCost":null,"costNarrative":"Exempt under Section 22 of the Freedom of Information Act 2000 (Information intended for future publication)","benefits":null,"benefitsNarrative":"Exempt under Section 22 of the Freedom of Information Act 2000 (Information intended for future publication)","themes":[],"evidenceExcerpt":"Exempt under Section 22 of the Freedom of Information Act 2000 (Information intended for future publication) Exempt under Section 22 of the Freedom of Information Act 2000 (Information intended for future publication)","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 22 of the Freedom of Information Act 2000 (Information intended for future publication)","narrativeClaimKind":null},{"id":"DFE_0109_2223-Q1","year":2024,"name":"Lifelong Learning Entitlement","department":"DFE","category":"Government Transformation and Service Delivery","description":"The Lifelong Learning Entitlement (LLE) proposed to introduce a new student finance system from 2025, co-designed with the Student Loans Company (SLC). The LLE will provide individuals with a loan entitlement to the equivalent of 4 years of post-18 education to use over their working lives (e.g. 37,000 in today's fees) up until the age of 60. It will be available for both full years of study at higher technical and degree levels, as well as, for the first time, for modules of high-value courses, regardless of whether they are provided in colleges or universities. Under this flexible skills system, people will be able to space out their studies and learn at a pace that is right for them, including choosing to build up their qualifications over time, within both FE and HE providers. They will have a real choice in how and when they study to acquire new life-changing skills. The LLE also aims to create a more streamlined funding system and make it easier for students to navigate the options available","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. An IPA assurance review in Feb 24 recognised the journey towards the LLE's introduction is ambitious and the programme must ensure all of its constituent parts are functional and operational upon launch. In recognition of the complexity of the programme and the challenges of launching a new system impacting hundreds of thousands of learners, the Conservative Government opted to move to a phased rollout of the LLE from Sep 25, with courses starting from Jan 26.","startDate":"2020-09-30","endDate":"2027-12-31","scheduleNarrative":"The project's end-date at 23/24-Q4 is 2027-12-31. This is primarily due to the following factors. Compared to 22/23-Q4, the project's end-date changed from 31 December 2025 to 31 December 2027. This is primarily due to the government allowing providers longer to prepare for registration with OfS, which they need to do to access the LLE. In the LLE consultation response, published in March 2023, the Government asked OfS to develop a third category of registration to provide an appropriate approach for smaller providers typically offering level 4 and 5 qualifications. Subject to consultation, this would have included transitional arrangements for providers from 2025 to 2027. To support this, the government is extending existing advanced learner loan funding for a further 2 years, until 2027, for providers who have not registered with OfS under either of the 2 existing categories. The programme end date has therefore moved out. Overall the programme is making good progress on the schedule, moving at pace to lay the required secondary legislation and develop the LLE systems. Students will be able to apply for LLE courses from September 2025, for courses starting from January 2026.","fyBaseline":0.0,"fyForecast":17.59,"fyVariance":null,"varianceNarrative":"The GMPP project did not provide data","wholeLifeCost":0.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 23/24-Q4 is 0m. This is primarily due to the following factors. The project's Whole Life Costs have not yet been agreed by the department.","benefits":0.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 0m. The project's monetised benefits have not yet been agreed by the department.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Technical & integration"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. An IPA assurance review in Feb 24 recognised the journey towards the LLE's introduction is ambitious and the programme must ensure all of its constituent parts are functional and operational upon launch. In…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 23/24-Q4 is 2027-12-31. This is primarily due to the following factors. Compared to 22/23-Q4, the project's end-date changed from 31 December 2025 to 31 December 2027. This is primarily due to the government allowing providers longer to prepare for registration with OfS, which they need to do to access the LLE. In the LLE consultation response, published in March 2023, the Government asked OfS to develop a third category of registration to provide an appropriate approach for smaller providers typically offering level 4 and 5 qualifications. Subject to consultation, this would have included transitional arrangements for providers from 2025 to 2027. To support this, the government is extending existing advanced learner loan funding for a further 2 years, until 2027, for providers who have not registered with OfS under either of the 2 existing categories. The programme end date has therefore moved out. Overall the programme is making good progress on the schedule, moving at pace to lay the required secondary legislation and develop the LLE systems. Students will be able to apply for LLE courses from September 2025, for courses starting from January 2026.","narrativeClaimKind":null},{"id":"DFE_0109_2223-Q1","year":2025,"name":"LIFELONG LEARNING ENTITLEMENT","department":"DfE","category":"Government Transformation and Service Delivery","description":"The Lifelong Learning Entitlement (LLE) was announced by the Government in 2020 and responds to recommendations in the Augar Review of post-18 education and training. The LLE will deliver a transformational change to the student finance system in England, by broadening access to high-quality, flexible education and training. The LLE will launch in academic year 2026/27 for learners studying courses starting on or after 1 January 2027. From launch, it will provide individuals with a loan entitlement the equivalent to four years of full-time undergraduate tuition fees for use over their working lives to learn, upskill and retrain. Learners will be able to use this new entitlement more flexibly than ever before to fund individual modules as well as full courses at Levels 4 to 6, regardless of whether they are provided in colleges, universities, or independent providers. It will create opportunities for both young people and adults to develop the skills needed to succeed in life, contributing to growth across the entire country.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Section 22 - Information intended for future publication.","startDate":"2020-09-30","endDate":null,"scheduleNarrative":"Section 22 - Information intended for future publication","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 22 - Information intended for future publication","wholeLifeCost":null,"costNarrative":"Section 22 - Information intended for future publication","benefits":null,"benefitsNarrative":"Section 22 - Information intended for future publication","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Section 22 - Information intended for future publication. Section 22 - Information intended for future publication","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Section 22 - Information intended for future publication","narrativeClaimKind":null},{"id":"DFE_0109_2223-Q1","year":2026,"name":"Lifelong Learning Entitlement","department":"DFE","category":"Government Transformation and Service Delivery","description":"The Lifelong Learning Entitlement (LLE) was announced by the then Prime Minister in 2020 and responds to recommendations in the Augar review of post-18 education and training. The LLE will deliver a transformational change to the student finance system in England, by broadening access to high-quality, flexible education and training. The LLE will launch in academic year 2026/27 for learners studying courses starting on or after 1 January 2027. From launch, it will provide individuals with a loan entitlement the equivalent to four years of full-time undergraduate tuition fees for use over their working lives to learn, upskill and retrain. Learners will be able to use this new entitlement more flexibly than ever before to fund individual modules as well as full courses at levels 4 to 6, regardless of whether they are provided in colleges, universities, or independent providers. It will create opportunities for both young people and adults to develop the skills needed to succeed in life, contributing to growth across the entire country.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Delivery confidence for 2025/26 remains Amber. The programme has made steady progress towards launch in 2026/27. The Amber rating is primarily driven by the programme’s inherent complexity, tight and inflexible legislative timelines ahead of launch, capacity pressures within delivery partners, and uneven sector readiness. These risks are ongoing and require careful management. The focus now is on delivering legislation to schedule, maintaining delivery partner capacity and strengthening engagement with providers to secure readiness. Confidence will improve if legislative milestones are met, sector preparedness becomes more consistent, and system testing remains on track. Delay in these areas will place pressure on launch plans given limited contingency.","startDate":"2020-09-30","endDate":null,"scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 has been brought forward to 31/03/27. This recognises that the LLE will launch in September 2026 for courses starting in January 2027; after that the programme will transition into BAU operational delivery structures.","fyBaseline":22.0,"fyForecast":22.0,"fyVariance":22.0,"varianceNarrative":"Exempt under Section 22 – Information intended for future publication ​","wholeLifeCost":null,"costNarrative":"Exempt under Section 22 - Information intended for future publication","benefits":null,"benefitsNarrative":"Exempt under Section 22 - Information intended for future publication","themes":["Delivery & schedule","Workforce & capability","Cost & funding","Technical & integration"],"evidenceExcerpt":"Delivery confidence for 2025/26 remains Amber. The programme has made steady progress towards launch in 2026/27. The Amber rating is primarily driven by the programme’s inherent complexity, tight and inflexible legislative timelines ahead of launch, capacity pressures within delivery partners, and uneven sector readiness. These risks are ongoing and require…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 has been brought forward to 31/03/27. This recognises that the LLE will launch in September 2026 for courses starting in January 2027; after that the programme will transition into BAU operational delivery structures.","narrativeClaimKind":null}],"previous":{"id":"DFE_0109_2223-Q1","year":2025,"name":"LIFELONG LEARNING ENTITLEMENT","department":"DfE","category":"Government Transformation and Service Delivery","description":"The Lifelong Learning Entitlement (LLE) was announced by the Government in 2020 and responds to recommendations in the Augar Review of post-18 education and training. The LLE will deliver a transformational change to the student finance system in England, by broadening access to high-quality, flexible education and training. The LLE will launch in academic year 2026/27 for learners studying courses starting on or after 1 January 2027. From launch, it will provide individuals with a loan entitlement the equivalent to four years of full-time undergraduate tuition fees for use over their working lives to learn, upskill and retrain. Learners will be able to use this new entitlement more flexibly than ever before to fund individual modules as well as full courses at Levels 4 to 6, regardless of whether they are provided in colleges, universities, or independent providers. It will create opportunities for both young people and adults to develop the skills needed to succeed in life, contributing to growth across the entire country.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Section 22 - Information intended for future publication.","startDate":"2020-09-30","endDate":null,"scheduleNarrative":"Section 22 - Information intended for future publication","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 22 - Information intended for future publication","wholeLifeCost":null,"costNarrative":"Section 22 - Information intended for future publication","benefits":null,"benefitsNarrative":"Section 22 - Information intended for future publication","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Section 22 - Information intended for future publication. Section 22 - Information intended for future publication","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Section 22 - Information intended for future publication","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":null,"attentionScore":25,"attentionReasons":["Current published delivery confidence is Amber","In-year forecast variance is +22.0%"]},{"id":"DFE_0018_2021-Q3","year":2026,"name":"School Rebuilding Programme","department":"DFE","category":"Infrastructure and Construction","description":"The School Rebuilding Programme carries out major rebuilding and refurbishment projects at school and sixth-form college buildings across England. We have committed almost £20 billion investment in the School Rebuilding Programme through to 2034–35, delivering rebuilding projects at over 750 schools and sixth-form colleges across England. There are over 500 schools already in the programme and we will select a further 250 schools to join the programme by early 2027.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Delivery confidence is Amber and is moving towards Green, reflecting strong performance against the programme’s key delivery metrics in 2025–26, including exceeding targets for both contract awards and project commencements, both by more than 10%. The government is investing almost £20 billion in the School Rebuilding Programme through to 2034–35, rebuilding or refurbishing buildings at over 750 schools and sixth-form colleges across England, with more than 500 projects already in the programme. The nomination round for the next 250 projects has now closed, and we will work closely with local authorities and other key stakeholders to assess applications, prioritising schools and sixth-form colleges in the worst condition and in areas where places are needed. Schools and sixth-form colleges selected for the School Rebuilding Programme will be confirmed by early 2027.","startDate":"2020-11-01","endDate":null,"scheduleNarrative":"Exempt under Section 22 - Information intended for future publication","fyBaseline":22.0,"fyForecast":22.0,"fyVariance":22.0,"varianceNarrative":"Exempt under Section 22 – Information intended for future publication ​","wholeLifeCost":null,"costNarrative":"Exempt under Section 22 - Information intended for future publication","benefits":null,"benefitsNarrative":"Exempt under Section 22 - Information intended for future publication","themes":["Delivery & schedule","Commercial & supply chain"],"evidenceExcerpt":"Delivery confidence is Amber and is moving towards Green, reflecting strong performance against the programme’s key delivery metrics in 2025–26, including exceeding targets for both contract awards and project commencements, both by more than 10%. The government is investing almost £20 billion in the School Rebuilding Programme through to 2034–35,…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 22 - Information intended for future publication","narrativeClaimKind":null,"history":[{"id":"DFE_0018_2021-Q3","year":2021,"name":"School Rebuilding Programme","department":"DFE","category":"Infrastructure and Construction","description":"The School Rebuilding Programme (SRP) is undertaking major rebuilding and refurbishment projects targeted at school and sixth form college buildings in the worst condition across England. The programme was announced by the PM in June 2020. The number of projects in the programme was confirmed publicly in HMT SR 2020 documentation, with a commitment to announcing 50 new school rebuilding projects a year for ten years. The first 50 projects were announced in February 2021, with the next round of projects expected to be announced in the summer.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber.This is primarily due to the following factors: Since announcing the programme, we have made good progress on programme set up and we have started delivery. The first round of projects is progressing well to agreed timescales and we are currently selecting the second round, on track to announce these in summer 2021 as planned. The programme is subject to a HMT approval in May 2021 before the first projects can proceed to contract. We are in ongoing discussions with HMT that will continue throughout April and May. The full programme budget will be confirmed at the next SR.","startDate":"2020-11-01","endDate":"2033-03-31","scheduleNarrative":"The project end-date is 31 March 2033. This is primarily due to the following factors: The programme scheduled end date remains unchanged.","fyBaseline":0.0,"fyForecast":0.0,"fyVariance":null,"varianceNarrative":"N/A - no costs yet reported on.","wholeLifeCost":0.0,"costNarrative":"N/A - no costs yet reported on.","benefits":null,"benefitsNarrative":"","themes":["Delivery & schedule","Approvals & decisions","Commercial & supply chain","Cost & funding"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber.This is primarily due to the following factors: Since announcing the programme, we have made good progress on programme set up and we have started delivery. The first round of projects is progressing well to agreed timescales and we are currently selecting the second…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project end-date is 31 March 2033. This is primarily due to the following factors: The programme scheduled end date remains unchanged.","narrativeClaimKind":null},{"id":"DFE_0018_2021-Q3","year":2022,"name":"School Rebuilding Programme","department":"DFE","category":"Infrastructure and Construction","description":"The School Rebuilding Programme (SRP) is undertaking major rebuilding and refurbishment projects targeted at school and sixth form college buildings in the worst condition across England. The programme was announced by the PM in June 2020. The number of projects in the programme was confirmed publicly in HMT SR 2020 documentation, with a commitment to 50 projects a year/500 over ten years. An initial programme budget up to the end of the expected SR21 period was agreed with HMT in May 2021 (HMT confirmation letter received in July 2021) as part of the programme's clearance through the Treasury Approval Process (TAP). The first 100 projects announced last year are in delivery and a significant programme milestone was achieved (and met a Prime Ministerial commitment) with a number of the most advanced projects having signed contracts and started in site in September 2021. The next selection round is underway and we aim to provisionally select up to 300 schools later this year.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 remained at Amber The IPA has not yet communicated its DCA to your project. Until they do, please use your SRO DCA for the current quarter as a proxy for the IPA DCA, and write a narrative on the key factors that led your projects DCA to increase/stagnate/decrease since the last ARMP. The first 100 projects announced last year are in delivery. We achieved a significant programme milestone (and met a Prime Ministerial commitment) with a number (7) of the most advanced projects having signed contracts and started work on-site during September 2021, with a further 3 projects entering contract in March 2022. The next selection round is underway and we aim to provisionally select up to 300 schools later this year.","startDate":"2020-11-01","endDate":null,"scheduleNarrative":"Compared to 2021-Q4, your project end-date remained scheduled to finish on 31 MAR 2033 . This is primarily due to the following factors: The programme scheduled end date remains unchanged.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 22 of the Freedom of Information Act 2000 (Information intended for future publication)","wholeLifeCost":null,"costNarrative":"Exempt under Section 22 of the Freedom of Information Act 2000 (Information intended for future publication)","benefits":null,"benefitsNarrative":"","themes":["Delivery & schedule","Commercial & supply chain","Cost & funding","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 remained at Amber The IPA has not yet communicated its DCA to your project. Until they do, please use your SRO DCA for the current quarter as a proxy for the IPA DCA, and write a narrative on the key factors that led your projects…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to 2021-Q4, your project end-date remained scheduled to finish on 31 MAR 2033 . This is primarily due to the following factors: The programme scheduled end date remains unchanged.","narrativeClaimKind":null},{"id":"DFE_0018_2021-Q3","year":2023,"name":"School Rebuilding Programme","department":"DFE","category":"Infrastructure and Construction","description":"The School Rebuilding Programme (SRP) is undertaking major rebuilding and refurbishment projects targeted at school and sixth form college buildings in the worst condition across England. The programme was announced by the PM in June 2020. The number of projects in the programme was confirmed publicly in HMT SR 2020 documentation, with a commitment to announcing 50 new school rebuilding projects a year for ten years. An initial programme budget was agreed with HMT in May 2021 (HMT confirmation letter received in July 2021) as part of the programmes clearance through the Treasury Approval Process (TAP). The first 161 projects from Rounds 1-3 are in delivery and we achieved a significant programme milestone with the first SRP project handed over in February 2023. Additionally, 24 projects have now entered contract as of March 2023, 15 in the 22/23 financial year. We announced a further 239 schools into the programme in December 2022, from nominations received in 2022. These schools will enter into delivery at approximately 50 projects per year over the next 5 years.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. The first 161 projects from Rounds 1-3 are in delivery and we achieved a significant programme milestone with the first SRP project handed over in February 2023. Additionally, 24 projects have now entered contract as of March 2023, 15 in the 22/23 financial year.We announced a further 239 schools into the programme in December 2022, from nominations received in 2022. These schools will enter into delivery at approximately 50 projects per year over the next 5 years.","startDate":"2020-11-01","endDate":null,"scheduleNarrative":"The programme scheduled end date remains changed.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 22 of the Freedom of Information Act 2000 (Information intended for future publication)","wholeLifeCost":null,"costNarrative":"Exempt under Section 22 of the Freedom of Information Act 2000 (Information intended for future publication)","benefits":null,"benefitsNarrative":"Exempt under Section 22 of the Freedom of Information Act 2000 (Information intended for future publication)","themes":["Delivery & schedule","Cost & funding","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. The first 161 projects from Rounds 1-3 are in delivery and we achieved a significant programme milestone with the first SRP project handed over in February 2023.…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The programme scheduled end date remains changed.","narrativeClaimKind":null},{"id":"DFE_0018_2021-Q3","year":2024,"name":"School Rebuilding Programme","department":"DFE","category":"Infrastructure and Construction","description":"The School Rebuilding Programme (SRP) is undertaking major rebuilding and refurbishment projects targeted at school and sixth form college buildings in the worst condition across England. The programme was announced by the PM in June 2020. The number of projects in the 10-year programme was confirmed at SR 2020, with a commitment to 500 projects (50 per year). An initial programme budget was agreed with HMT in May 2021 (HMT confirmation letter was received in July 2021) as part of the programme's clearance through the Treasury Approval Process (TAP), with funding up to FY2024-25 confirmed at SR21.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. On 8 February, we announced the funding route for all schools and colleges with RAAC confirmed in their buildings - meaning we currently have 513 schools in the programme. There is a possibility that the number of RAAC cases increases but we expect the number of any further cases to be low. We now have 218 projects in delivery for the programme and at the beginning of April, we have entered into contract on 54 and handed over 10 projects. This means we met our targets for the number of projects to enter into contract award for the financial spend forecasts for the 2023/24 financial year. We are currently reviewing the prioritisation of the remaining 295 projects, including those that joined the programme on the 8 February, these remaining projects being previously selected schools and RAAC schools, as well schools facing serious structural safety issues, entering SRP.","startDate":"2020-11-01","endDate":"2036-03-31","scheduleNarrative":"The project's end-date at 23/24-Q4 is 2036-03-31. This is primarily due to the following factors. The programme scheduled end date was updated to reflect the programme financial forecasts.","fyBaseline":0.0,"fyForecast":0.0,"fyVariance":null,"varianceNarrative":"ARMP adjustments - Project not yet in a position to give cost/schedule","wholeLifeCost":null,"costNarrative":"ARMP adjustments - Project not yet in a position to give cost/schedule","benefits":null,"benefitsNarrative":"ARMP adjustments - Project not yet in a position to give cost/schedule","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. On 8 February, we announced the funding route for all schools and colleges with RAAC confirmed in their buildings - meaning we currently have 513 schools in the…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 23/24-Q4 is 2036-03-31. This is primarily due to the following factors. The programme scheduled end date was updated to reflect the programme financial forecasts.","narrativeClaimKind":null},{"id":"DFE_0018_2021-Q3","year":2025,"name":"SCHOOL REBUILDING PROGRAMME","department":"DfE","category":"Infrastructure and Construction","description":"The School Rebuilding Programme was announced in June 2020 to carry out major rebuilding and refurbishment projects at primary, secondary and sixth form college buildings across England, with buildings prioritised based on their condition. The ten-year programme launched with a commitment to 500 rebuilding projects over the next decade, replacing poor condition and ageing school buildings with modern, energy efficient designs.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Section 22 - Information intended for future publication.","startDate":"2020-06-29","endDate":null,"scheduleNarrative":"","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 22 - Information intended for future publication","wholeLifeCost":null,"costNarrative":"Section 22 - Information intended for future publication","benefits":null,"benefitsNarrative":"Section 22 - Information intended for future publication","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Section 22 - Information intended for future publication.","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"","narrativeClaimKind":null},{"id":"DFE_0018_2021-Q3","year":2026,"name":"School Rebuilding Programme","department":"DFE","category":"Infrastructure and Construction","description":"The School Rebuilding Programme carries out major rebuilding and refurbishment projects at school and sixth-form college buildings across England. We have committed almost £20 billion investment in the School Rebuilding Programme through to 2034–35, delivering rebuilding projects at over 750 schools and sixth-form colleges across England. There are over 500 schools already in the programme and we will select a further 250 schools to join the programme by early 2027.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Delivery confidence is Amber and is moving towards Green, reflecting strong performance against the programme’s key delivery metrics in 2025–26, including exceeding targets for both contract awards and project commencements, both by more than 10%. The government is investing almost £20 billion in the School Rebuilding Programme through to 2034–35, rebuilding or refurbishing buildings at over 750 schools and sixth-form colleges across England, with more than 500 projects already in the programme. The nomination round for the next 250 projects has now closed, and we will work closely with local authorities and other key stakeholders to assess applications, prioritising schools and sixth-form colleges in the worst condition and in areas where places are needed. Schools and sixth-form colleges selected for the School Rebuilding Programme will be confirmed by early 2027.","startDate":"2020-11-01","endDate":null,"scheduleNarrative":"Exempt under Section 22 - Information intended for future publication","fyBaseline":22.0,"fyForecast":22.0,"fyVariance":22.0,"varianceNarrative":"Exempt under Section 22 – Information intended for future publication ​","wholeLifeCost":null,"costNarrative":"Exempt under Section 22 - Information intended for future publication","benefits":null,"benefitsNarrative":"Exempt under Section 22 - Information intended for future publication","themes":["Delivery & schedule","Commercial & supply chain"],"evidenceExcerpt":"Delivery confidence is Amber and is moving towards Green, reflecting strong performance against the programme’s key delivery metrics in 2025–26, including exceeding targets for both contract awards and project commencements, both by more than 10%. The government is investing almost £20 billion in the School Rebuilding Programme through to 2034–35,…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 22 - Information intended for future publication","narrativeClaimKind":null}],"previous":{"id":"DFE_0018_2021-Q3","year":2025,"name":"SCHOOL REBUILDING PROGRAMME","department":"DfE","category":"Infrastructure and Construction","description":"The School Rebuilding Programme was announced in June 2020 to carry out major rebuilding and refurbishment projects at primary, secondary and sixth form college buildings across England, with buildings prioritised based on their condition. The ten-year programme launched with a commitment to 500 rebuilding projects over the next decade, replacing poor condition and ageing school buildings with modern, energy efficient designs.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Section 22 - Information intended for future publication.","startDate":"2020-06-29","endDate":null,"scheduleNarrative":"","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 22 - Information intended for future publication","wholeLifeCost":null,"costNarrative":"Section 22 - Information intended for future publication","benefits":null,"benefitsNarrative":"Section 22 - Information intended for future publication","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Section 22 - Information intended for future publication.","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":null,"attentionScore":25,"attentionReasons":["Current published delivery confidence is Amber","In-year forecast variance is +22.0%"]},{"id":"DESNZ_0375_2425-Q1","year":2026,"name":"Boiler Upgrade Scheme","department":"DESNZ","category":"Infrastructure and Construction","description":"The Boiler Upgrade Scheme (BUS) is part of a wider package of measures to drive significant heat pump deployment and support the expansion of the low carbon heat market. The scheme provides grants to encourage property owners to replace existing fossil fuel heating with more efficient, low carbon heating systems including air source heat pumps (ASHP), ground source heat pumps (GSHP) and, in limited circumstances, biomass boilers. The grant available for an ASHP and GSHP is £7,500, and £5,000for biomass boilers. The scheme was set to run from April 2022 until March 2025 supported by £450m. The scheme has been extended to 2029/30 and the funding allocation for 2025/26 to 2029/30 is £2,687m as set out in the Warm Homes Plan.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The SRO delivery confidence assessment rating for 25/26 remained at Amber. The scheme is operationally mature and performing strongly, with sustained year‑on‑year growth in deployment. Applications in 2025/26 were up 19% on 24/25, with redemptions up 21%. The BUS Evaluation evidenced a high level of property owner satisfaction at 91% and MCS outreach recorded an average 95% satisfaction rate. The implementation of scheme changes announced in the November 2025 Government Response, will improve access, stimulate demand and strengthen consumer protection, and come into force from 28 April 2026. The Full Business Case for FY 2026/27 to 2029/30 has received TAP approval, confirming funding for the remainder of the scheme timeline. While demand and delivery continue to grow, overall delivery confidence remains dependent on wider market and policy factors, including the delivery of the Warm Homes Plan; given the materiality of these dependencies, an Amber rating remains appropriate.","startDate":null,"endDate":"2030-03-31","scheduleNarrative":"The project end date in 2025/26 was extended from March 2026 to March 2030. This reflects the extension of the scheme following the Spending Review, which provided additional funding and extended delivery to March 2030.","fyBaseline":297.75,"fyForecast":244.58,"fyVariance":17.86,"varianceNarrative":"During 2025/26, the scheme was extended to 2030 following the Spending Review, which agreed an increased budget for the remaining years of the scheme. This extended the delivery period by four years and increased total funding for the extension period to £2,392m. Funding allocations for these years were set out in the Warm Homes Plan in January 2026.","wholeLifeCost":3054.03,"costNarrative":"The project’s departmentally agreed whole life cost increased due to the extension of the scheme to 2030 following the Spending Review, which increased both the duration and scale of delivery. As a result, total funding for the extension period increased with the annual budgets set out in the Warm Homes Plan in January 2026.","benefits":4043.09,"benefitsNarrative":"The project’s departmentally agreed benefits at Q4 2025/26 are estimated at £4,043m (real prices, base year 24/25). These benefits primarily reflect the monetised social value of carbon emissions reductions and air quality improvements arising from the installation of low-carbon heating systems under the scheme. These benefits are partially offset by disbenefits, reflecting the additional capital and maintenance costs associated with these technologies, as well as long run variable costs of fuel, relative to a like for like replacement of incumbent heating systems, which are typically fossil fuel boilers.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"The SRO delivery confidence assessment rating for 25/26 remained at Amber. The scheme is operationally mature and performing strongly, with sustained year‑on‑year growth in deployment. Applications in 2025/26 were up 19% on 24/25, with redemptions up 21%. The BUS Evaluation evidenced a high level of property owner satisfaction at 91% and MCS outreach…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project end date in 2025/26 was extended from March 2026 to March 2030. This reflects the extension of the scheme following the Spending Review, which provided additional funding and extended delivery to March 2030.","narrativeClaimKind":null,"history":[{"id":"DESNZ_0375_2425-Q1","year":2025,"name":"Boiler Upgrade Scheme","department":"DESNZ","category":"Infrastructure and Construction","description":"The Boiler Upgrade Scheme (BUS) is part of a package of measures designed to deliver significant heat pump deployment growth and support the expansion of the low carbon heat market. The scheme provides grants to encourage property owners to replace existing fossil fuel heating with more efficient, low carbon heating systems including air source heat pumps (ASHP), ground source heat pumps (GSHP) and, in limited circumstances, biomass boilers. The grant available for an ASHP and GSHP is £7,500, while the grant available for a biomass boilers is £5,000. The scheme was set to run from April 2022 until March 2025 supported by £450m (split evenly across the three years). The scheme has been extended and the funding allocation for 2025/26 is £295m. Funding for subsequent years (2026/27 onwards) is subject to the second phase of the spending review.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER. This is due to‚ The scheme being a well-established project in its fourth year of delivery that is performing strong both operationally and in terms of deployment. The £150 million budget for the 3rd year of the scheme was exceeded, allowing an increase in the deployment of heat pumps, with total deployment reaching £190 million. Moreover, the scheme has a TAP approved budget for 25/26 of £295 million which allows room for further growth to build on year three of the scheme. The operational success of the scheme, teamed with strong deployment, suggests the scheme is close to a green rating. However, external factors—such as the ongoing spending review—introduce uncertainty. Until these are resolved, the scheme will retain an Amber RAG rating.","startDate":"2022-04-01","endDate":null,"scheduleNarrative":"The project's end-date at 24/25-Q4 is scheduled to be 31/03/2026. This is primarily due to the following factors‚ The spending review outcome as this is where a decision will be made on the tenure of the scheme and the associated budgets. We expect the scheme to continue beyond the 31/03/26 date, but cannot currently confirm the exact length of this extension.","fyBaseline":160.0,"fyForecast":211.1,"fyVariance":31.94,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ Increased heat pump deployment is the driving factor of the budget variance. This is due to a positive increase in the uptake of vouchers under the scheme, allowing for more Heat Pump installations. For example, in 23/24 the scheme received 22,111 voucher applications and paid out 13,847 vouchers. Due to increased interest in heat pumps as a result of the scheme, 24/25 saw a significant increase with 38,412 voucher applications received and 25,331 paid out.","wholeLifeCost":794.4,"costNarrative":"The project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) is 487. This is primarily due to the following factors‚ The scheme was initially due to run for three years only with a total budget of £450 million, allocated equally at £150 million per year between 2022- 2025. Therefore the further funding was for the resourcing of the scheme across these years including funding Ofgem to administer the scheme and a small policy team at DESNZ.","benefits":987.0,"benefitsNarrative":"The project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) is 987. This is primarily due to the following factors‚ The monetised benefits are the estimated social value of emissions reduced and air quality improvements from the installation of heat pumps on the scheme. The benefits also include any reductions in long term variable costs when switching from a fossil fuel boiler to a heat pump.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER. This is due to‚ The scheme being a well-established project in its fourth year of delivery that is performing strong both operationally and in terms of deployment. The £150 million budget for the 3rd year of the scheme was exceeded, allowing an increase in the…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 24/25-Q4 is scheduled to be 31/03/2026. This is primarily due to the following factors‚ The spending review outcome as this is where a decision will be made on the tenure of the scheme and the associated budgets. We expect the scheme to continue beyond the 31/03/26 date, but cannot currently confirm the exact length of this extension.","narrativeClaimKind":null},{"id":"DESNZ_0375_2425-Q1","year":2026,"name":"Boiler Upgrade Scheme","department":"DESNZ","category":"Infrastructure and Construction","description":"The Boiler Upgrade Scheme (BUS) is part of a wider package of measures to drive significant heat pump deployment and support the expansion of the low carbon heat market. The scheme provides grants to encourage property owners to replace existing fossil fuel heating with more efficient, low carbon heating systems including air source heat pumps (ASHP), ground source heat pumps (GSHP) and, in limited circumstances, biomass boilers. The grant available for an ASHP and GSHP is £7,500, and £5,000for biomass boilers. The scheme was set to run from April 2022 until March 2025 supported by £450m. The scheme has been extended to 2029/30 and the funding allocation for 2025/26 to 2029/30 is £2,687m as set out in the Warm Homes Plan.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The SRO delivery confidence assessment rating for 25/26 remained at Amber. The scheme is operationally mature and performing strongly, with sustained year‑on‑year growth in deployment. Applications in 2025/26 were up 19% on 24/25, with redemptions up 21%. The BUS Evaluation evidenced a high level of property owner satisfaction at 91% and MCS outreach recorded an average 95% satisfaction rate. The implementation of scheme changes announced in the November 2025 Government Response, will improve access, stimulate demand and strengthen consumer protection, and come into force from 28 April 2026. The Full Business Case for FY 2026/27 to 2029/30 has received TAP approval, confirming funding for the remainder of the scheme timeline. While demand and delivery continue to grow, overall delivery confidence remains dependent on wider market and policy factors, including the delivery of the Warm Homes Plan; given the materiality of these dependencies, an Amber rating remains appropriate.","startDate":null,"endDate":"2030-03-31","scheduleNarrative":"The project end date in 2025/26 was extended from March 2026 to March 2030. This reflects the extension of the scheme following the Spending Review, which provided additional funding and extended delivery to March 2030.","fyBaseline":297.75,"fyForecast":244.58,"fyVariance":17.86,"varianceNarrative":"During 2025/26, the scheme was extended to 2030 following the Spending Review, which agreed an increased budget for the remaining years of the scheme. This extended the delivery period by four years and increased total funding for the extension period to £2,392m. Funding allocations for these years were set out in the Warm Homes Plan in January 2026.","wholeLifeCost":3054.03,"costNarrative":"The project’s departmentally agreed whole life cost increased due to the extension of the scheme to 2030 following the Spending Review, which increased both the duration and scale of delivery. As a result, total funding for the extension period increased with the annual budgets set out in the Warm Homes Plan in January 2026.","benefits":4043.09,"benefitsNarrative":"The project’s departmentally agreed benefits at Q4 2025/26 are estimated at £4,043m (real prices, base year 24/25). These benefits primarily reflect the monetised social value of carbon emissions reductions and air quality improvements arising from the installation of low-carbon heating systems under the scheme. These benefits are partially offset by disbenefits, reflecting the additional capital and maintenance costs associated with these technologies, as well as long run variable costs of fuel, relative to a like for like replacement of incumbent heating systems, which are typically fossil fuel boilers.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"The SRO delivery confidence assessment rating for 25/26 remained at Amber. The scheme is operationally mature and performing strongly, with sustained year‑on‑year growth in deployment. Applications in 2025/26 were up 19% on 24/25, with redemptions up 21%. The BUS Evaluation evidenced a high level of property owner satisfaction at 91% and MCS outreach…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project end date in 2025/26 was extended from March 2026 to March 2030. This reflects the extension of the scheme following the Spending Review, which provided additional funding and extended delivery to March 2030.","narrativeClaimKind":null}],"previous":{"id":"DESNZ_0375_2425-Q1","year":2025,"name":"Boiler Upgrade Scheme","department":"DESNZ","category":"Infrastructure and Construction","description":"The Boiler Upgrade Scheme (BUS) is part of a package of measures designed to deliver significant heat pump deployment growth and support the expansion of the low carbon heat market. The scheme provides grants to encourage property owners to replace existing fossil fuel heating with more efficient, low carbon heating systems including air source heat pumps (ASHP), ground source heat pumps (GSHP) and, in limited circumstances, biomass boilers. The grant available for an ASHP and GSHP is £7,500, while the grant available for a biomass boilers is £5,000. The scheme was set to run from April 2022 until March 2025 supported by £450m (split evenly across the three years). The scheme has been extended and the funding allocation for 2025/26 is £295m. Funding for subsequent years (2026/27 onwards) is subject to the second phase of the spending review.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER. This is due to‚ The scheme being a well-established project in its fourth year of delivery that is performing strong both operationally and in terms of deployment. The £150 million budget for the 3rd year of the scheme was exceeded, allowing an increase in the deployment of heat pumps, with total deployment reaching £190 million. Moreover, the scheme has a TAP approved budget for 25/26 of £295 million which allows room for further growth to build on year three of the scheme. The operational success of the scheme, teamed with strong deployment, suggests the scheme is close to a green rating. However, external factors—such as the ongoing spending review—introduce uncertainty. Until these are resolved, the scheme will retain an Amber RAG rating.","startDate":"2022-04-01","endDate":null,"scheduleNarrative":"The project's end-date at 24/25-Q4 is scheduled to be 31/03/2026. This is primarily due to the following factors‚ The spending review outcome as this is where a decision will be made on the tenure of the scheme and the associated budgets. We expect the scheme to continue beyond the 31/03/26 date, but cannot currently confirm the exact length of this extension.","fyBaseline":160.0,"fyForecast":211.1,"fyVariance":31.94,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ Increased heat pump deployment is the driving factor of the budget variance. This is due to a positive increase in the uptake of vouchers under the scheme, allowing for more Heat Pump installations. For example, in 23/24 the scheme received 22,111 voucher applications and paid out 13,847 vouchers. Due to increased interest in heat pumps as a result of the scheme, 24/25 saw a significant increase with 38,412 voucher applications received and 25,331 paid out.","wholeLifeCost":794.4,"costNarrative":"The project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) is 487. This is primarily due to the following factors‚ The scheme was initially due to run for three years only with a total budget of £450 million, allocated equally at £150 million per year between 2022- 2025. Therefore the further funding was for the resourcing of the scheme across these years including funding Ofgem to administer the scheme and a small policy team at DESNZ.","benefits":987.0,"benefitsNarrative":"The project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) is 987. This is primarily due to the following factors‚ The monetised benefits are the estimated social value of emissions reduced and air quality improvements from the installation of heat pumps on the scheme. The benefits also include any reductions in long term variable costs when switching from a fossil fuel boiler to a heat pump.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER. This is due to‚ The scheme being a well-established project in its fourth year of delivery that is performing strong both operationally and in terms of deployment. The £150 million budget for the 3rd year of the scheme was exceeded, allowing an increase in the…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 24/25-Q4 is scheduled to be 31/03/2026. This is primarily due to the following factors‚ The spending review outcome as this is where a decision will be made on the tenure of the scheme and the associated budgets. We expect the scheme to continue beyond the 31/03/26 date, but cannot currently confirm the exact length of this extension.","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":null,"attentionScore":24,"attentionReasons":["Current published delivery confidence is Amber","In-year forecast variance is +17.9%"]},{"id":"MOJ_0062_2122-Q3","year":2026,"name":"Evolve: End User Computer Service (EUCS)","department":"MOJ","category":"Information and Communications Technology (ICT)","description":"Ensure the continuation of critical End User Compute Services (EUCS) used by MoJ staff every day, and implement a future-fit model for MoJ users. In order to achieve the future state, there are 3 EUCS streams: 1) The management of 3 re-procurements of EUCS suitable for the current and future needs of MoJ; 2) insource EUCS activity to bring certain capabilities in-house, and 3) migrate users on the legacy FITS services to the organisation's MoJ Official (MoJo) service.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25-Q4, the NISTA Delivery Confidence Assessment (DCA) rating has remained at Green. This is primarily due to successful progression through key procurement exercises, and ongoing confidence in planned delivery.","startDate":"2021-09-27","endDate":"2026-10-15","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end date at 25/26-Q4 changed from 27/03/26 to 15/10/26. This is primarily due to the increased time required to manage the transition between services, and increased contingency based on insights from lessons learned.","fyBaseline":61.62,"fyForecast":38.28,"fyVariance":37.88,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to reduced running costs due to a delay in service stand up and less expenditure on devices than planned.","wholeLifeCost":190.18,"costNarrative":"Compared to financial year 24/25-Q4, The Whole Life Cost has decreased from £193.31m to £190.18m. The budget remains aligned to the current baseline business case. All costs have been reported in 2024/25 base prices in line with NISTA requirements. This is a change from previous years where costs were reported in nominal prices. All costs reflect this accounting reduction regardless of any actual changes.","benefits":27.39,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's Benefits have decreased. However, this is only due to the new NISTA requirement to reflect costs and benefits in 2024/25 base prices, not because monetised benefits have decreased. Forecasted monetised benefits remain in line with the project's business case.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 24/25-Q4, the NISTA Delivery Confidence Assessment (DCA) rating has remained at Green. This is primarily due to successful progression through key procurement exercises, and ongoing confidence in planned delivery. Compared to financial year 24/25-Q4, the project's end date at 25/26-Q4 changed from 27/03/26 to 15/10/26. This is…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end date at 25/26-Q4 changed from 27/03/26 to 15/10/26. This is primarily due to the increased time required to manage the transition between services, and increased contingency based on insights from lessons learned.","narrativeClaimKind":null,"history":[{"id":"MOJ_0062_2122-Q3","year":2023,"name":"Evolve: End User Computer Service","department":"MOJ","category":"ICT","description":"Ensure the continuation of critical End User Compute Services (EUCS) used by MoJ staff every day, and Implement an EUCS Future State model, which is crucial to achieving the strategic objective of a single technology ecosystem to all 110k MoJ users by 2025. In order to achieve the future state, there are 3 EUCS streams 1) The management of 3 re-procurements of EUCS suitable for the current and future needs of the Authority covering EUCS Platform & Legacy services, Hardware Sourcing and Hardware Support Services, 2) EUCS Insourcing to bring certain capabilities in-house, 3) Converge & Accelerate focuses on the migrating users on the legacy FITS services to the organisations service MoJ Official.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 is Green. This is primarily due to the following factors. This is the first time data has been published for this project, which has been added to GMPP over the last year.The project has been assessed as Green and is on track to deliver against baseline schedule and costs.","startDate":"2021-09-27","endDate":"2025-04-30","scheduleNarrative":"The project's end-date at 22/23-Q4 is 2025-04-30. This is primarily due to the following factors. The project is on track to deliver against the re-baselined schedule.","fyBaseline":33.33,"fyForecast":10.46,"fyVariance":-69.0,"varianceNarrative":"The underspend is due to reduced in-year activity requiring costs to be re-profiled into future years.","wholeLifeCost":340.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 22/23-Q4 is 340m. This is primarily due to the following factors. The Whole Life Costs in the Outline Business Case include projects costs for resources, 3rd party involvement and legal fees, costs to run the service once in place and costs for the purchase of new hardware","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This project currently reports no monetised benefits. The project benefits focus on the continued quality of operation of end user compute services contracts.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Technical & integration"],"evidenceExcerpt":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 is Green. This is primarily due to the following factors. This is the first time data has been published for this project, which has been added to GMPP over the last year.The project has been assessed as Green and is on track to deliver against baseline schedule and costs. The…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 22/23-Q4 is 2025-04-30. This is primarily due to the following factors. The project is on track to deliver against the re-baselined schedule.","narrativeClaimKind":null},{"id":"MOJ_0062_2122-Q3","year":2024,"name":"Evolve: End User Computer Service","department":"MOJ","category":"ICT","description":"Ensure the continuation of critical End User Compute Services (EUCS) used by MoJ staff every day, and Implement an EUCS Future State model, which is crucial to achieving the strategic objective of a single technology ecosystem to all 110k MoJ users. In order to achieve the future state, there are 3 EUCS streams 1) The management of 3 re-procurements of EUCS suitable for the current and future needs of the Authority covering EUCS Platform & Legacy services, Hardware Sourcing and Hardware Support Services, 2) EUCS Insourcing to bring certain capabilities in-house, 3) Converge & Accelerate focuses on the migrating users on the legacy Future IT Services to the organisations service MoJ Official.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 22/23-Q4, Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 increased from Green to Amber. This is primarily due to the following factors. Timetable risks due to the complexity of multiple procurements.","startDate":"2021-09-27","endDate":"2025-11-30","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 increased from 2025-04-30 to 2025-11-30. This is primarily due to the following factors. The programme has rebaselined its schedule following realignment of the delivery.","fyBaseline":56.58,"fyForecast":29.49,"fyVariance":-48.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The underspend is due to reduced in-year activities requiring costs to be re-profiled into future years.","wholeLifeCost":340.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 remained at 340m. This is primarily due to the following factors. The Whole Life Cost has remained static, and the budget remains aligned to the current baseline business case.","benefits":0.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 0m. This project currently reports no monetised benefits. The project's benefits focus on the continued quality of operation of End User Compute Services Contracts.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 increased from Green to Amber. This is primarily due to the following factors. Timetable risks due to the complexity of multiple procurements. Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 increased from 2025-04-30 to…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 increased from 2025-04-30 to 2025-11-30. This is primarily due to the following factors. The programme has rebaselined its schedule following realignment of the delivery.","narrativeClaimKind":null},{"id":"MOJ_0062_2122-Q3","year":2025,"name":"Evolve: End User Computer Service (EUCS)","department":"MoJ","category":"ICT","description":"Project Brief Description: Ensure the continuation of critical End User Compute Services (EUCS) used by MoJ staff every day, and Implement an EUCS Future State model, which is crucial to achieving the strategic objective of a single technology ecosystem to all 110k MoJ users. In order to achieve the future state, there are 3 EUCS streams 1) The management of 3 re-procurements of EUCS suitable for the current and future needs of the Authority covering EUCS Platform & Legacy services, Hardware Sourcing and Hardware Support Services, 2) EUCS Insourcing to bring certain capabilities in-house, 3) Converge & Accelerate focuses on the migrating users on the legacy Future IT Services to the organisations service MoJ Official.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors‚ The schedule was re-baselined following validation of the procurement approach and is now on track for delivery.","startDate":"2021-09-27","endDate":"2026-03-27","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 30/11/2025 to 27/03/2026. This is primarily due to the following factors‚ The schedule was re-baselined following validation of the procurement approach.","fyBaseline":38.83,"fyForecast":47.85,"fyVariance":23.23,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The overspend is mainly due to the early utilisation of the new contracts.","wholeLifeCost":193.31,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 340 to 193. This is primarily due to the following factors‚ The increase reflects significant savings following approval of Full Business Case.","benefits":28.9,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 0 to 28.90. This is primarily due to the following factors‚ Confirmation of monetisation of benefits following approval of Full Business Case.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors‚ The schedule was re-baselined following validation of the procurement approach and is now on track for delivery. Compared to financial year 23/24-Q4, the…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 30/11/2025 to 27/03/2026. This is primarily due to the following factors‚ The schedule was re-baselined following validation of the procurement approach.","narrativeClaimKind":null},{"id":"MOJ_0062_2122-Q3","year":2026,"name":"Evolve: End User Computer Service (EUCS)","department":"MOJ","category":"Information and Communications Technology (ICT)","description":"Ensure the continuation of critical End User Compute Services (EUCS) used by MoJ staff every day, and implement a future-fit model for MoJ users. In order to achieve the future state, there are 3 EUCS streams: 1) The management of 3 re-procurements of EUCS suitable for the current and future needs of MoJ; 2) insource EUCS activity to bring certain capabilities in-house, and 3) migrate users on the legacy FITS services to the organisation's MoJ Official (MoJo) service.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25-Q4, the NISTA Delivery Confidence Assessment (DCA) rating has remained at Green. This is primarily due to successful progression through key procurement exercises, and ongoing confidence in planned delivery.","startDate":"2021-09-27","endDate":"2026-10-15","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end date at 25/26-Q4 changed from 27/03/26 to 15/10/26. This is primarily due to the increased time required to manage the transition between services, and increased contingency based on insights from lessons learned.","fyBaseline":61.62,"fyForecast":38.28,"fyVariance":37.88,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to reduced running costs due to a delay in service stand up and less expenditure on devices than planned.","wholeLifeCost":190.18,"costNarrative":"Compared to financial year 24/25-Q4, The Whole Life Cost has decreased from £193.31m to £190.18m. The budget remains aligned to the current baseline business case. All costs have been reported in 2024/25 base prices in line with NISTA requirements. This is a change from previous years where costs were reported in nominal prices. All costs reflect this accounting reduction regardless of any actual changes.","benefits":27.39,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's Benefits have decreased. However, this is only due to the new NISTA requirement to reflect costs and benefits in 2024/25 base prices, not because monetised benefits have decreased. Forecasted monetised benefits remain in line with the project's business case.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 24/25-Q4, the NISTA Delivery Confidence Assessment (DCA) rating has remained at Green. This is primarily due to successful progression through key procurement exercises, and ongoing confidence in planned delivery. Compared to financial year 24/25-Q4, the project's end date at 25/26-Q4 changed from 27/03/26 to 15/10/26. This is…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end date at 25/26-Q4 changed from 27/03/26 to 15/10/26. This is primarily due to the increased time required to manage the transition between services, and increased contingency based on insights from lessons learned.","narrativeClaimKind":null}],"previous":{"id":"MOJ_0062_2122-Q3","year":2025,"name":"Evolve: End User Computer Service (EUCS)","department":"MoJ","category":"ICT","description":"Project Brief Description: Ensure the continuation of critical End User Compute Services (EUCS) used by MoJ staff every day, and Implement an EUCS Future State model, which is crucial to achieving the strategic objective of a single technology ecosystem to all 110k MoJ users. In order to achieve the future state, there are 3 EUCS streams 1) The management of 3 re-procurements of EUCS suitable for the current and future needs of the Authority covering EUCS Platform & Legacy services, Hardware Sourcing and Hardware Support Services, 2) EUCS Insourcing to bring certain capabilities in-house, 3) Converge & Accelerate focuses on the migrating users on the legacy Future IT Services to the organisations service MoJ Official.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors‚ The schedule was re-baselined following validation of the procurement approach and is now on track for delivery.","startDate":"2021-09-27","endDate":"2026-03-27","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 30/11/2025 to 27/03/2026. This is primarily due to the following factors‚ The schedule was re-baselined following validation of the procurement approach.","fyBaseline":38.83,"fyForecast":47.85,"fyVariance":23.23,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The overspend is mainly due to the early utilisation of the new contracts.","wholeLifeCost":193.31,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 340 to 193. This is primarily due to the following factors‚ The increase reflects significant savings following approval of Full Business Case.","benefits":28.9,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 0 to 28.90. This is primarily due to the following factors‚ Confirmation of monetisation of benefits following approval of Full Business Case.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors‚ The schedule was re-baselined following validation of the procurement approach and is now on track for delivery. Compared to financial year 23/24-Q4, the…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 30/11/2025 to 27/03/2026. This is primarily due to the following factors‚ The schedule was re-baselined following validation of the procurement approach.","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":202,"attentionScore":24,"attentionReasons":["Published end date moved 202 days later","In-year forecast variance is +37.9%"]},{"id":"MOD_0116_1718-Q2","year":2026,"name":"FLEET SOLID SUPPORT","department":"MOD","category":"Military Capability","description":"Fleet Solid Support will deliver three auxiliary ships to provide stores, ammunition and food sustainment to Naval Forces at Sea.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors. 1. The Fleet Solid Support programme has continued to make steady progress in the 2025/6 reporting year with the Critical Design Review milestone achieved in late 2025 ahead of formal cut steel for RFA Resurgent (ship 1) on 03 Dec 25. 2. The programme is now firmly in production with blocks started at three of the build locations. Navantia UK understanding and growth of capability at the yards they now operate, post Harland and Wolff takeover, has progressed. 3. The major part of the infrastructure investment agreed as part of the FSS contract is now nearing completion. 4. Areas of concern remain the supply chain, team resourcing and the longer-term issue of the crewing of the ships which at present will likely slow the entry into service","startDate":"2016-03-14","endDate":"2033-07-28","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same at 31/03/2033.","fyBaseline":285.51,"fyForecast":334.12,"fyVariance":17.02,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. 1. The In Year variance (over-spend) is driven by the contractor regaining pace against the milestone payment plan that has lagged in previous years. This is particularly the case where the infrastructure investment that had stalled before the Navantia UK takeover of Harland and Wolff, is now nearing completion for the major elements including the automated panel line.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Delivery & schedule","Cost & funding","Commercial & supply chain","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors. 1. The Fleet Solid Support programme has continued to make steady progress in the 2025/6 reporting year with the Critical Design Review milestone achieved in late 2025 ahead of formal…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same at 31/03/2033.","narrativeClaimKind":null,"history":[{"id":"MOD_0116_1718-Q2","year":2020,"name":"Fleet Solid Support","department":"MOD","category":"Military Capability","description":"Auxiliary Shipping to provide stores, ammunition and food sustainment to Naval Forces at Sea.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber, which has not changed since last year�s Q2 1819 Amber, due primarily to the following factors; - Delivery forecast at Q2 was Amber, however cancelation of the competition means Design and Manufacture contract will not be awarded in 2020. The programme is currently undergoing a period of review and reset.","startDate":"2016-04-01","endDate":"2030-04-30","scheduleNarrative":"The scheduled baseline project end date at Q2 1920 (30th September 2019) is 30/04/30, has not changed since last year's Q2 1819 date of 30/04/30, due primarily to the following factors; - On 5 November 2019 the Secretary of State for Defence agreed that the Fleet Solid Support ship competition should be stopped because it had become clear that a value for money solution could not be reached. The Department is now considering the most appropriate way forward for the Fleet Solid Support Programme. It is too early to say what impact stopping the competition might have on the entry into service of the Fleet Solid Support ships. This will be reviewed as part of our work to develop a way forward.","fyBaseline":0.66,"fyForecast":0.66,"fyVariance":0.0,"varianceNarrative":"Budget variance less than 5%","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests)","benefits":null,"benefitsNarrative":"","themes":["Commercial & supply chain","Delivery & schedule","Scope & requirements","Cost & funding"],"evidenceExcerpt":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber, which has not changed since last year�s Q2 1819 Amber, due primarily to the following factors; - Delivery forecast at Q2 was Amber, however cancelation of the competition means Design and Manufacture contract will not be awarded in 2020. The programme is…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2020","sourceLabel":"IPA Annual Report 2019-20","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The scheduled baseline project end date at Q2 1920 (30th September 2019) is 30/04/30, has not changed since last year's Q2 1819 date of 30/04/30, due primarily to the following factors; - On 5 November 2019 the Secretary of State for Defence agreed that the Fleet Solid Support ship competition should be stopped because it had become clear that a value for money solution could not be reached. The Department is now considering the most appropriate way forward for the Fleet Solid Support Programme. It is too early to say what impact stopping the competition might have on the entry into service of the Fleet Solid Support ships. This will be reviewed as part of our work to develop a way forward.","narrativeClaimKind":null},{"id":"MOD_0116_1718-Q2","year":2021,"name":"Fleet Solid Support","department":"MOD","category":"Military Capability","description":"Fleet Solid Support will provide Auxiliary Shipping for stores, ammunition and food sustainment to Naval Forces at Sea.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating increased from Amber to Amber/red. This is primarily due to the following factors: a Programme re-set, including approval for a revised Outline Business Case following the cancellation of the Fleet Solid Support competition in October 2019. Progress has continued spanning the reporting period, achieving a number of key activities and advancing through the approvals that are required to enable a new procurement to start in 2021, as announced publicly and directed by the Secretary of State for Defence on 21 October 2020. The Outline Business Case was considered and passed through Navy Command and Defence Equipment & Support assurance processes in November 2020 and completed Investment Approvals Committee consideration as expected in December 2020. As of 31 March 21, the final Departmental approval is still awaited. This approval will enable the new competition to commence, with the internal project and commercial aspects in place and ready to proceed. Delivery confidence remains under constant review.","startDate":"2016-04-01","endDate":"2030-04-30","scheduleNarrative":"Compared to financial year 19/20-Q2, the project's end-date remained scheduled to finish on 30 April 2030 . This is primarily due to the following factors:","fyBaseline":0.3,"fyForecast":0.28,"fyVariance":-7.0,"varianceNarrative":"The budget variance exceeds 5%. The 20/21 budget was underspent by 7% as a result of directed Departmental savings (which reduced the original budget) and committal blight during this exercise. There was no detrimental impact to the programme as this was accounted for in the subsequent reset.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"","themes":["Approvals & decisions","Cost & funding","Commercial & supply chain","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating increased from Amber to Amber/red. This is primarily due to the following factors: a Programme re-set, including approval for a revised Outline Business Case following the cancellation of the Fleet Solid Support competition in October 2019.…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 19/20-Q2, the project's end-date remained scheduled to finish on 30 April 2030 . This is primarily due to the following factors:","narrativeClaimKind":null},{"id":"MOD_0116_1718-Q2","year":2022,"name":"Fleet Solid Support","department":"MOD","category":"Military Capability","description":"Fleet Solid Support will provide Auxiliary Shipping for stores, ammunition and food sustainment to Naval Forces at Sea.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating increased from Amber/Red to Amber. This is primarily due to the following factors: The removal of the incremental Amber/Red and Amber/Green assessment ratings. A recent Infrastructure and Projects Authority targeted assurance review acknowledged the progress made in addressing the challenges noted in earlier reviews with regards to the complexity of delivering defence capabilities and leaving a lasting legacy to enhance future UK shipbuilding productivity, all for an affordable cost. It concluded that the Programme continues to maximise its use of resources to generate and optimise opportunities to provide the best route to a successful procurement outcome.","startDate":"2016-04-01","endDate":"2030-04-30","scheduleNarrative":"Compared to 2021-Q4 the project end-date remained scheduled to finish on 30 April 30.","fyBaseline":21.0,"fyForecast":13.0,"fyVariance":-38.0,"varianceNarrative":"The budget variance exceeds 5%. The 21/22 budget was 'under-spent' by 33% as a result of the Competitive Procurement Phase requiring re-profiling to reflect a delay to the planned start of this phase. This has resulted in some payment milestones slipping from one Financial Year to the next. This will translate into an equivalent adjustment in Financial Year 22/23.","wholeLifeCost":null,"costNarrative":"Exempt - Under Section 43 of the Freedom of Information Act 2000 - Commercial Considerations","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating increased from Amber/Red to Amber. This is primarily due to the following factors: The removal of the incremental Amber/Red and Amber/Green assessment ratings. A recent Infrastructure and Projects Authority targeted assurance review acknowledged…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to 2021-Q4 the project end-date remained scheduled to finish on 30 April 30.","narrativeClaimKind":null},{"id":"MOD_0116_1718-Q2","year":2023,"name":"Fleet Solid Support","department":"MOD","category":"Military Capability","description":"Auxiliary Shipping to provide stores, ammunition and food sustainment to Naval Forces at Sea.","ipaDca":"Green","sroDca":null,"deliveryConfidence":"Green","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 increased from Amber to Green. This is primarily due to the following factors. The Programme has concluded the manufacture contract competition, submitted and gained approval of the Full Business Case and subsequently awarded the prime contract.","startDate":"2016-03-14","endDate":"2033-03-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 increased from 2030-04-30 to 2033-03-31. This is primarily due to the following factors. The approval of the Full Business Case has enabled the schedule to be re-baselined and the Programme end date to align to the end of final budgetary approved year.","fyBaseline":71.05,"fyForecast":69.57,"fyVariance":-2.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This programme does not report cashable benefits. Its aim is to provision the armed forces with the equipment and / or infrastructure required.","themes":["Approvals & decisions","Commercial & supply chain","Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 increased from Amber to Green. This is primarily due to the following factors. The Programme has concluded the manufacture contract competition, submitted and gained approval of the Full Business Case and subsequently awarded the…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 increased from 2030-04-30 to 2033-03-31. This is primarily due to the following factors. The approval of the Full Business Case has enabled the schedule to be re-baselined and the Programme end date to align to the end of final budgetary approved year.","narrativeClaimKind":null},{"id":"MOD_0116_1718-Q2","year":2024,"name":"Fleet Solid Support","department":"MOD","category":"Military Capability","description":"Auxiliary Shipping to provide stores, ammunition and food sustainment to Naval Forces at Sea.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure and Projects Authority's Delivery Confidence Assessment rating at 23/24-Q4 decreased from Green to Amber. This is primarily due to the following factors. Since contract award in January 23, the project has been mobilising at pace to maintain the tight schedule to delivery. The prime contractor with the other members of Team Resolute are actively recruiting to build capability and capacity, with physical delivery focused on infrastructure investment and competing major sub-contracts for ship equipment. The reduction in DCA reflects the challenges recognised in maintaining a tight schedule against a difficult supply chain picture, post contract safety regulatory driven change and internal and external workforce retention and growth issues.","startDate":"2016-03-14","endDate":"2033-03-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the programme's end-date at 23/24-Q4 remained on schedule to finish 2033-03-31.","fyBaseline":248.95,"fyForecast":227.92,"fyVariance":-8.447,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. Reprofiling across the programme which reflects the latest forecasting, factoring in a slight delay in achieving sub-contracting milestones and an adjustment to delivery of Government Furnished Equipment to align with the prime contract schedule.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.)","benefits":0.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 0m.","themes":["Delivery & schedule","Commercial & supply chain","Cost & funding","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure and Projects Authority's Delivery Confidence Assessment rating at 23/24-Q4 decreased from Green to Amber. This is primarily due to the following factors. Since contract award in January 23, the project has been mobilising at pace to maintain the tight schedule to delivery. The prime contractor with the…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 22/23-Q4, the programme's end-date at 23/24-Q4 remained on schedule to finish 2033-03-31.","narrativeClaimKind":null},{"id":"MOD_0116_1718-Q2","year":2025,"name":"FLEET SOLID SUPPORT","department":"MoD","category":"Military Capability","description":"Auxiliary Shipping to provide stores, ammunition and food sustainment to Naval Forces at Sea.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Project's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER, compared with the Infrastructure and Projects Authority's assessment last year of AMBER. This is due to the following factors. The Fleet Solid Support (FSS) programme has continued to make steady progress with the first major milestone of Preliminary Design Review achieved in October 2024. The project now focuses on detailed design heading towards the start of construction which is planned for later this year. A significant risk materialised when it became apparent that the Harland & Wolff shipyards were in financial difficulty. Navantia UK confirmed their commitment to UK industry by securing a commercial deal to purchase the shipyards, thereby giving greater certainty of a successful delivery of the FSS contract. The impact on the overall programme schedule is currently being assessed. Areas of concern remain the supply chain, whilst internally team resourcing is a challenge with the longer-term issue of the crewing of the ships which at present will likely slow the entry into service.","startDate":"2016-03-14","endDate":null,"scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2033.","fyBaseline":286.7,"fyForecast":202.85,"fyVariance":29.24,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The inability to make some contractual payments due to delay in shipyard investment and the placing of some major sub-contracts whilst there was uncertainty over the Harland and Wolff solvency and ownership. This has been resolved through the Navantia UK purchase and progress is now being made toward these milestones.","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits","themes":["Delivery & schedule","Commercial & supply chain","Cost & funding","Scope & requirements"],"evidenceExcerpt":"The Project's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER, compared with the Infrastructure and Projects Authority's assessment last year of AMBER. This is due to the following factors. The Fleet Solid Support (FSS) programme has continued to make steady progress with the first major milestone of Preliminary Design Review achieved in October…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2033.","narrativeClaimKind":null},{"id":"MOD_0116_1718-Q2","year":2026,"name":"FLEET SOLID SUPPORT","department":"MOD","category":"Military Capability","description":"Fleet Solid Support will deliver three auxiliary ships to provide stores, ammunition and food sustainment to Naval Forces at Sea.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors. 1. The Fleet Solid Support programme has continued to make steady progress in the 2025/6 reporting year with the Critical Design Review milestone achieved in late 2025 ahead of formal cut steel for RFA Resurgent (ship 1) on 03 Dec 25. 2. The programme is now firmly in production with blocks started at three of the build locations. Navantia UK understanding and growth of capability at the yards they now operate, post Harland and Wolff takeover, has progressed. 3. The major part of the infrastructure investment agreed as part of the FSS contract is now nearing completion. 4. Areas of concern remain the supply chain, team resourcing and the longer-term issue of the crewing of the ships which at present will likely slow the entry into service","startDate":"2016-03-14","endDate":"2033-07-28","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same at 31/03/2033.","fyBaseline":285.51,"fyForecast":334.12,"fyVariance":17.02,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. 1. The In Year variance (over-spend) is driven by the contractor regaining pace against the milestone payment plan that has lagged in previous years. This is particularly the case where the infrastructure investment that had stalled before the Navantia UK takeover of Harland and Wolff, is now nearing completion for the major elements including the automated panel line.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Delivery & schedule","Cost & funding","Commercial & supply chain","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors. 1. The Fleet Solid Support programme has continued to make steady progress in the 2025/6 reporting year with the Critical Design Review milestone achieved in late 2025 ahead of formal…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same at 31/03/2033.","narrativeClaimKind":null}],"previous":{"id":"MOD_0116_1718-Q2","year":2025,"name":"FLEET SOLID SUPPORT","department":"MoD","category":"Military Capability","description":"Auxiliary Shipping to provide stores, ammunition and food sustainment to Naval Forces at Sea.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Project's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER, compared with the Infrastructure and Projects Authority's assessment last year of AMBER. This is due to the following factors. The Fleet Solid Support (FSS) programme has continued to make steady progress with the first major milestone of Preliminary Design Review achieved in October 2024. The project now focuses on detailed design heading towards the start of construction which is planned for later this year. A significant risk materialised when it became apparent that the Harland & Wolff shipyards were in financial difficulty. Navantia UK confirmed their commitment to UK industry by securing a commercial deal to purchase the shipyards, thereby giving greater certainty of a successful delivery of the FSS contract. The impact on the overall programme schedule is currently being assessed. Areas of concern remain the supply chain, whilst internally team resourcing is a challenge with the longer-term issue of the crewing of the ships which at present will likely slow the entry into service.","startDate":"2016-03-14","endDate":null,"scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2033.","fyBaseline":286.7,"fyForecast":202.85,"fyVariance":29.24,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The inability to make some contractual payments due to delay in shipyard investment and the placing of some major sub-contracts whilst there was uncertainty over the Harland and Wolff solvency and ownership. This has been resolved through the Navantia UK purchase and progress is now being made toward these milestones.","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits","themes":["Delivery & schedule","Commercial & supply chain","Cost & funding","Scope & requirements"],"evidenceExcerpt":"The Project's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER, compared with the Infrastructure and Projects Authority's assessment last year of AMBER. This is due to the following factors. The Fleet Solid Support (FSS) programme has continued to make steady progress with the first major milestone of Preliminary Design Review achieved in October…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2033.","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":null,"attentionScore":24,"attentionReasons":["Current published delivery confidence is Amber","In-year forecast variance is +17.0%"]},{"id":"HO_0039_1920-Q4","year":2026,"name":"FUTURE BORDER AND IMMIGRATION SYSTEM PROGRAMME (FBIS)","department":"HO","category":"Government Transformation and Service Delivery","description":"FBIS is transforming The UK’s border and immigration system into a streamlined, digital system which benefits our customers, enhances the security of the UK and prevents abuse of the system. The programmes top priorities include delivering eVisas, Electronic Travel Authorisation (ETAs), Routes and Applications Transformation and Border Vision.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the ongoing key risk in the plan; limited contingency. Any significant slippage will need clear prioritisation decisions.","startDate":"2018-04-01","endDate":"2027-03-31","scheduleNarrative":"Compared with Q4 2024/25, the project’s end date at Q4 2025/26 remains unchanged at 31 March 2027. This reflects the position set out in the latest Programme Business Case, which did not seek to extend the approved delivery timeframe. The programme maintains a clear understanding of its scope and has established delivery plans to realise its intended benefits.","fyBaseline":1068.87,"fyForecast":1262.26,"fyVariance":18.09,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to optimism bias and contingency, included in the baseline, was not required.","wholeLifeCost":5140.89,"costNarrative":"Compared with Q4 2024/25, the programme’s departmentally agreed Whole Life Cost at Q4 2025/26 has increased from £4,536m to £5,556m. This reflects the inclusion of running costs through to 2035/36, as well as cost increases across the period 2026/27 to 2034/35. The most significant increases in running costs are associated with Home Office Digital and Customer Services, reflecting updated delivery assumptions and the ongoing operation of the service.","benefits":13047.81,"benefitsNarrative":"Compared with Q4 2024/25, the programme’s departmentally agreed benefits at Q4 2025/26 (measured in £m) have decreased from £13,681m to £13,208m. This reflects the approval of the FBIS Programme Business Case (PBC) 2025 by HM Treasury in July 2025, which reset the departmental baseline for benefits from FY 2025/26 onwards. As part of the updated business case, a number of benefits previously included in the PBC 2024 baseline were treated as realised or sunk. This includes areas such as eVisa operational efficiencies, Detention and Workforce operational efficiencies, commercial savings, and reductions in eVisa call centre demand. As a result, these benefits are no longer reflected in the forward-looking baseline reported through GMPP, leading to an overall reduction in the total benefits figure.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the ongoing key risk in the plan; limited contingency. Any significant slippage will need clear prioritisation decisions. Compared with Q4 2024/25, the project’s end date at Q4 2025/26 remains unchanged at 31…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared with Q4 2024/25, the project’s end date at Q4 2025/26 remains unchanged at 31 March 2027. This reflects the position set out in the latest Programme Business Case, which did not seek to extend the approved delivery timeframe. The programme maintains a clear understanding of its scope and has established delivery plans to realise its intended benefits.","narrativeClaimKind":null,"history":[{"id":"HO_0039_1920-Q4","year":2021,"name":"Future Border and Immigration System Programme","department":"HO","category":"Government Transformation and Service Delivery","description":"The UK exited the European Union on 31 January 2020. From 1 January 2021 free movement ended and was replaced by a new points based immigration system. The Future Border and Immigration System (FBIS) will enable the UK to take back control of our border; it will simplify, enable and digitise our systems to put customers at the heart of a firmer, fairer and easier to navigate border and immigration system.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber/red.This is primarily due to the following factors: Programme confidence was assessed as Amber/Red in January 2021 by the Infrastructure and Projects Authority (IPA) assessment with a clear set of recommendations to move to an Amber rating by the end of the summer 2021. Work is underway to address these recommendations on scope, the development of the business case, articulating benefits, updating the Senior Responsible Owner (SRO) letters to reflect how the programme has moved on, dependencies and resources. The programme is now working to a new baselined delivery plan and resource plan and intends to publish a Strategy Statement setting out the scope in detail.","startDate":"2018-04-01","endDate":"2025-03-31","scheduleNarrative":"The project end-date is 31 March 2025. This is primarily due to the following factors: The programme successfully delivered the Points Based System last year before the end of freedom of movement on 31 December 2020. The programmes plans going forward are set out in a strategy statement which includes the key upcoming deliverables for 2021/22 and the vision for the border and immigration system to the end of 2024. This combines the programmes commitment to delivering a strong customer experience through a simplified, streamlined, user-centric system with how we will improve control by knowing who is coming in the UK and leaving, whilst increasing compliance.","fyBaseline":177.5,"fyForecast":149.65,"fyVariance":-16.0,"varianceNarrative":"The budget variance exceeds 5%. Underspends are largely a result of reduced demand resulting from COVID-19 restrictions. This has meant less case working has been required on cases; and less communication activity taking place.","wholeLifeCost":3344.55,"costNarrative":"The projects Baseline Whole Life Cost is �3344.55m. This is primarily due to the following factors: Costs are for the development and implementation of the United Kingdom's Future Border and Immigration System; as well as the running costs for the additional demand as a result of the new system. The baseline Whole Life Costs provided here have been created by bringing together material from different business cases. 2020/21 baselines have been derived from the Outline Business Case (OBC) approved by Treasury in March 2020 (with an adjustment made of �15.5m underspend due to reduced demand). Baselines from 2021/22 and beyond have been taken from a departmentally approved Programme Business Case produced in Autumn 2020.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Scope & requirements"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber/red.This is primarily due to the following factors: Programme confidence was assessed as Amber/Red in January 2021 by the Infrastructure and Projects Authority (IPA) assessment with a clear set of recommendations to move to an Amber rating by the end of the summer 2021.…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project end-date is 31 March 2025. This is primarily due to the following factors: The programme successfully delivered the Points Based System last year before the end of freedom of movement on 31 December 2020. The programmes plans going forward are set out in a strategy statement which includes the key upcoming deliverables for 2021/22 and the vision for the border and immigration system to the end of 2024. This combines the programmes commitment to delivering a strong customer experience through a simplified, streamlined, user-centric system with how we will improve control by knowing who is coming in the UK and leaving, whilst increasing compliance.","narrativeClaimKind":null},{"id":"HO_0039_1920-Q4","year":2022,"name":"Future Border and Immigration System Programme","department":"HO","category":"Government Transformation and Service Delivery","description":"The United Kingdom exited the European Union on 31 January 2020. From 1 January 2021 free movement ended and was replaced by a new points based immigration system. The Future Border and Immigration System will enable the United Kingdom to take back control of our border, it will simplify, enable and digitise our systems to put customers at the heart of a firmer, fairer and easier to navigate border and immigration system.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 decreased from Amber/red to Amber. The programme received a delivery confidence rating of Amber for the whole of the programme following the last Infrastructure & Projects Authority Review (July 21). We have taken a number of actions recommended by the Infrastructure & Projects Authority, including reviewing how strategic intent for the Enable pillar is framed through establishing the Enable Board where stakeholders agreed the role and scope of Enable (11/10/21). We also clarified and documented plans for the transition of completed projects and products into the \"business as usual\" operating environment, formulating a Transition Team alongside resourcing changes and funding work to ensure projects/products are subject to normal budget planning processes once in business as usual.","startDate":"2018-04-01","endDate":"2025-03-31","scheduleNarrative":"Compared to 2021-Q4, your project end-date remained scheduled to finish on 31 MAR 2025 . This is primarily due to the following factors: Compared to 2021-Q4, programme end-date remained scheduled to finish on 31 March 2025. This is primarily due to the programmes flexible approach in relation to delivery which has seen the re-prioritisation of programme deliverables resulting in continued successful delivery throughout 21/22. We do however continue to see additions to the plan because of the ever-changing political climate (Ukraine, Plan for Growth, ongoing discussion on net migration and the operation of the points-based system, etc). Currently the programme finish date hasn't change but continued additions to scope is increasing the risk delivery timescales if this continues.","fyBaseline":233.4,"fyForecast":170.74,"fyVariance":-27.0,"varianceNarrative":"The budget variance exceeds 5%. At the start of the 21/22 financial year, the programme quickly identified a £27m budget surplus that was released to support broader portfolio priorities. A further £33m reduction was identified in Period 8 comprised of reductions in communications forecasts linked to the pandemic, lower operating costs and corresponding IT run costs. At Period 11 the net position had improved as demand and associated income increased. Capital spend was lower than envisaged resulting in £19m returned centrally to support pressures elsewhere in MBG","wholeLifeCost":3357.0,"costNarrative":"Compared to2021-Q4, the projects Baseline Whole Life Cost increased from 3344.55 (£m) to 3356.90 (£m). This is primarily due to the following factors: Costs are for the development and implementation of the United Kingdom's Future Border and Immigration System; as well as the running costs for the additional demand as a result of the new system.Figures up to and including 21/22 are based on actual expenditure and end year forecasts. 22/23 figures are based on spending review controls and baselines from 23/24 and beyond have been taken from a departmentally approved Programme Business Case produced in Autumn 2021.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 decreased from Amber/red to Amber. The programme received a delivery confidence rating of Amber for the whole of the programme following the last Infrastructure & Projects Authority Review (July 21). We have taken a number of actions…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to 2021-Q4, your project end-date remained scheduled to finish on 31 MAR 2025 . This is primarily due to the following factors: Compared to 2021-Q4, programme end-date remained scheduled to finish on 31 March 2025. This is primarily due to the programmes flexible approach in relation to delivery which has seen the re-prioritisation of programme deliverables resulting in continued successful delivery throughout 21/22. We do however continue to see additions to the plan because of the ever-changing political climate (Ukraine, Plan for Growth, ongoing discussion on net migration and the operation of the points-based system, etc). Currently the programme finish date hasn't change but continued additions to scope is increasing the risk delivery timescales if this continues.","narrativeClaimKind":null},{"id":"HO_0039_1920-Q4","year":2023,"name":"Future Border and Immigration System Programme","department":"HO","category":"Government Transformation and Service Delivery","description":"The United Kingdom exited the European Union on 31 January 2020. From 1 January 2021, free movement ended and was replaced by a new points based immigration system. The Future Border and Immigration System will enable the United Kingdom to take back control of our border, it will simplify, enable and digitise our systems to put customers at the heart of a firmer, fairer and easier to navigate border and immigration system.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber (SRO rating). This is primarily due to the following factors. The programme received a delivery confidence rating of Amber for the whole of the programme following an Independent Review (September 2022). The programme have looked to address a number of actions following the review, including reviewing how strategic intent for the Enable pillar is framed through establishing the Enable Board where stakeholders agreed the role and scope of Enable. The programme has also clarified and documented plans for the transition of completed projects and products into the business as usual operating environment, formulating a Transition Team alongside resourcing changes and funding work to ensure projects/products are subject to normal budget planning processes once in business as usual.","startDate":"2018-04-01","endDate":"2025-03-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2025-03-31. This is primarily due to the following factors. Compared to 2022-Q4, programme end-date remained scheduled to finish on 31 March 2025. This is primarily due to the programmes flexible approach in relation to delivery which has seen the re-prioritisation of programme deliverables resulting in continued successful delivery throughout 21/22. We do however continue to see additions to the plan because of the ever-changing political climate (Ukraine, Plan for Growth, ongoing discussion on net migration and the operation of the points-based system, etc). Currently the programme finish date hasnt change but continued additions to scope is increasing the risk delivery timescales if this continues.","fyBaseline":404.0,"fyForecast":273.2,"fyVariance":-32.0,"varianceNarrative":"The budget variance exceeds 5%. Optimism bias and contingency totalling 71m that was removed as part of spending review allocation. This results in the programme showing a larger under spend vs baseline than actual budget. In-year budgets were reduced by 10m in line with Optimus savings in Q1 and further savings have been identified with Digital Data and Technology Capital Departmental Expenditure Limit project lines, programme resource and Comms Media & Marketing through in year re forecasts. FBIS continues to take a proactive approach to managing underspends and addressing optimism bias in workforce plans. At P06 it was agreed that forecasts would reduce by a further 31m to return funds centrally early and ensure programme budgetary governance remains robust. The programme continues to deliver against key milestones despite taking on additional scope.","wholeLifeCost":3428.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 increased from 3357m. to 3428m. This is primarily due to the following factors. Costs are for the development and implementation of the United Kingdoms Future Border and Immigration System; as well as the running costs for the additional demand as a result of the new system.Figures up to and including 22/23 are based on actual expenditure and end year forecasts. Baselines from 23/24 and beyond have been taken from a departmentally approved Programme Business Case produced in Autumn 2021. The FBIS Business Case is due to be refreshed in April 2023 and the GMPP will be refreshed with latest figures in Q1 of 23/24.","benefits":40905.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 40905m. The project's departmental-agree monetised benefits at 22/23-Q4 is 40905m. The Programme will help to deliver a range of benefits to its customers, the Home Office, UK economy and wider international economy. The Simplify Pillar will continue to deliver a simplified immigration process through the improvement of existing routes and introduction of new ones and the delivery of a digital, simplified, and modern sponsorship system that enables a more efficient operation for users.The Enable pillar will transform the customer and caseworker experience through implementing and enabling digital systems. Modern services and aligned customer and caseworker capacities are vital for the successful delivery of the Programme and enhancing border security.The Digitise Pillar will utilise technology to improve border security. This will be achieved through watch listing and analytics to identify at risk persons before they arrive to the UK. This Pillars aim is to create an end state of contactless border, where passports and documents are replaced by biometrics.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Technical & integration"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber (SRO rating). This is primarily due to the following factors. The programme received a delivery confidence rating of Amber for the whole of the programme following an Independent Review (September 2022). The programme have looked to address a number…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2025-03-31. This is primarily due to the following factors. Compared to 2022-Q4, programme end-date remained scheduled to finish on 31 March 2025. This is primarily due to the programmes flexible approach in relation to delivery which has seen the re-prioritisation of programme deliverables resulting in continued successful delivery throughout 21/22. We do however continue to see additions to the plan because of the ever-changing political climate (Ukraine, Plan for Growth, ongoing discussion on net migration and the operation of the points-based system, etc). Currently the programme finish date hasnt change but continued additions to scope is increasing the risk delivery timescales if this continues.","narrativeClaimKind":null},{"id":"HO_0039_1920-Q4","year":2024,"name":"Future Border and Immigration System Programme","department":"HO","category":"Government Transformation and Service Delivery","description":"The United Kingdom exited the European Union on 31 January 2020. From 1 January 2021, free movement ended and was replaced by a new points based immigration system. The Future Border and Immigration System will enable the United Kingdom to take back control of our border, it will simplify, enable and digitise our systems to put customers at the heart of a firmer, fairer and easier to navigate border and immigration system.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber(IPA rating). This is primarily due to the following factors. The programme received a delivery confidence rating of Amber for the whole of the programme following an Independent Review (January 2023). The programme has looked to address a number of actions following the review, including reviewing how Programme Board decision making includes impact statements of longer-term consequences associated with preferred option(s), strengthening the management of Dependencies and that FBIS carries out scenario planning exercises around the risk of the e-Visa deployment milestone being missed, as well as it happening as planned but with significant issues.","startDate":"2018-04-01","endDate":"2025-03-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2025-03-31. This is primarily due to the following factors. A new programme end date of 31/03/27 has been agreed by the Programme Board. This is to maximise the benefits of the programme by facilitating full eVisa, ETA and sponsorship delivery. This is yet to be approved by InvestCo and HMT. Therefore, formally agreed end date of the programme is 31/03/25. The FBIS programme continues to see additions to the plan because of the ever-changing political climate (Ukraine, Plan for Growth, ongoing discussion on net migration and the operation of the points-based system, etc.","fyBaseline":446.0,"fyForecast":383.3,"fyVariance":-14.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. FBIS Tdel budgets for the full year is 107.7m, having increased from 58m since the start of the financial year. This increase was mainly due to receiving 46m of IMA funding._x000D_ _x000D_ IMA funding was to support the impact of IMA on technical capacity within FBIS and the need to reprioritise some deliverables._x000D_ _x000D_ There was a 2.7m increase in P7, transferring budget from Asylum Protection Transformation Programme, in relation to MAB work that was identified as FBIS._x000D_ _x000D_ Rdel budget increased by 0.5m (MAB) and 10.7m (IMA) to 181m._x000D_ _x000D_ Cdel budget increased by 2.2m (MAB) and 35.4m (IMA) to 196.7m._x000D_ _x000D_ Income budget of 270m remained the same throughout the year. P12 forecast was 450m, the increase was mainly due to higher demand in the Graduate route._x000D_ _x000D_ Tight forecasting controls have been in place since the start of the year. We are currently under spending on cdel due to reprioritising on some deliverable and better assumptions around costs.","wholeLifeCost":3428.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 remained at 3428m. This is primarily due to the following factors. Costs are for the development and implementation of the United Kingdom's Future Border and Immigration System; as well as the running costs for the additional demand because of the new system. Figures up to and including 23/24 are based on actual expenditure and end year forecasts. Baselines from 24/25 have been taken from Programme Business Case produced in Autumn 2021 and approved by HMT. The FBIS Business Case was refreshed during 2023 and will be submitted to InvestCo in April 24 and HMT in due course.","benefits":40967.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 2324-Q4 increased from 40905m. to 40967m. The Programme will help to deliver a range of benefits to its customers, the Home Office, UK economy and wider international economy. _x000D_ The Simplify Pillar will continue to deliver a simplified immigration process through the improvement of existing routes and introduction of new ones and the delivery of a digital, simplified, and modern sponsorship system that enables a more efficient operation for users._x000D_ The Enable pillar will transform the customer and caseworker experience through implementing and enabling digital systems. Modern services and aligned customer and caseworker capacities are vital for the successful delivery of the Programme and enhancing border security._x000D_ The Digitise Pillar will utilise technology to improve border security. This will be achieved through watch listing and analytics to identify at risk persons before they arrive to the UK. This Pillar's aim is to create an end state of 'contactless border', where passports and documents are replaced by biometrics.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber(IPA rating). This is primarily due to the following factors. The programme received a delivery confidence rating of Amber for the whole of the programme following an Independent Review (January 2023). The programme has looked to address a number of…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2025-03-31. This is primarily due to the following factors. A new programme end date of 31/03/27 has been agreed by the Programme Board. This is to maximise the benefits of the programme by facilitating full eVisa, ETA and sponsorship delivery. This is yet to be approved by InvestCo and HMT. Therefore, formally agreed end date of the programme is 31/03/25. The FBIS programme continues to see additions to the plan because of the ever-changing political climate (Ukraine, Plan for Growth, ongoing discussion on net migration and the operation of the points-based system, etc.","narrativeClaimKind":null},{"id":"HO_0039_1920-Q4","year":2025,"name":"FUTURE BORDER AND IMMIGRATION SYSTEM PROGRAMME (FBIS)","department":"HO","category":"Government Transformation and Service Delivery","description":"FBIS puts customers at the heart of a firmer, fairer and easier to navigate border and immigration system. The FBIS Programme has been established to lead the design and delivery of the future system, improving security, efficiency and customer experience. The programmes top priorities include delivering eVisas, Electronic Travel Authorisation (ETAs), Sponsorship and Border Vision.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The FBIS delivery plan is ambitious with limited contingency; changes to the scope of the programme caused by the Immigration White Paper or global events will require prioritisation decisions against exiting commitments. eVisa delivery currently remains the programme’s top priority. However, there is a risk that lack of Digital, Data and Technology (DDaT) delivery capability required for this.","startDate":"2018-04-01","endDate":"2027-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2025 to 31/03/2027. This is primarily due to the following factors‚ Programme extension was to March 2027 has been approved by Home Office Investment Committee (InvestCo) and HMT with a new Business Case. This was to facilitate full delivery and benefit realisation of eVisa, ETA, Sponsorship and Border Vision.","fyBaseline":579.0,"fyForecast":457.4,"fyVariance":21.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ Underspending within the Programme Directorate, specifically Caseworking Capability, led to the budget variance.","wholeLifeCost":4536.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 3428 to 4536. This is primarily due to the following factors‚ On 12th of November 2024, the Programme Business Case (PBC) was signed off by HM Treasury (HMT). As such, the baseline figures have been updated in line with this.","benefits":13681.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) decreased from 40967 to 13681. This is primarily due to the following factors‚ In Q4 of FY 2023/24, the most recent FBIS Programme Business Case (PBC) approved by HM Treasury (HMT) was the 2021 version, which formed the basis for the GMPP baseline benefits at that time. On 12 November 2024, HMT approved the updated PBC 2024. As a result, the GMPP baseline benefits were revised to align with the newly agreed figures. From FY 2024/25 to FY 2033/34, the benefit baselines now reflect the data set out in the PBC 2024. A key change in the updated baselines is the inclusion of the Electronic Travel Authorisation (ETA) disbenefit, which had not been baselined in the PBC 2021 and was therefore previously excluded from GMPP reporting. Another key change includes the Wider Socio-Economic Impact benefits, which were not baselined in the PBC 2024 as they have been delivered by the Programme so are deemed sunk and as such have been removed from the annual benefit baselines. This adjustment resulted in a reduction in the Wider UK Public Economic baseline from FY 2024/25 to FY 2030/31.","themes":["Cost & funding","Delivery & schedule","Technical & integration","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The FBIS delivery plan is ambitious with limited contingency; changes to the scope of the programme caused by the Immigration White Paper or global events will…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2025 to 31/03/2027. This is primarily due to the following factors‚ Programme extension was to March 2027 has been approved by Home Office Investment Committee (InvestCo) and HMT with a new Business Case. This was to facilitate full delivery and benefit realisation of eVisa, ETA, Sponsorship and Border Vision.","narrativeClaimKind":null},{"id":"HO_0039_1920-Q4","year":2026,"name":"FUTURE BORDER AND IMMIGRATION SYSTEM PROGRAMME (FBIS)","department":"HO","category":"Government Transformation and Service Delivery","description":"FBIS is transforming The UK’s border and immigration system into a streamlined, digital system which benefits our customers, enhances the security of the UK and prevents abuse of the system. The programmes top priorities include delivering eVisas, Electronic Travel Authorisation (ETAs), Routes and Applications Transformation and Border Vision.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the ongoing key risk in the plan; limited contingency. Any significant slippage will need clear prioritisation decisions.","startDate":"2018-04-01","endDate":"2027-03-31","scheduleNarrative":"Compared with Q4 2024/25, the project’s end date at Q4 2025/26 remains unchanged at 31 March 2027. This reflects the position set out in the latest Programme Business Case, which did not seek to extend the approved delivery timeframe. The programme maintains a clear understanding of its scope and has established delivery plans to realise its intended benefits.","fyBaseline":1068.87,"fyForecast":1262.26,"fyVariance":18.09,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to optimism bias and contingency, included in the baseline, was not required.","wholeLifeCost":5140.89,"costNarrative":"Compared with Q4 2024/25, the programme’s departmentally agreed Whole Life Cost at Q4 2025/26 has increased from £4,536m to £5,556m. This reflects the inclusion of running costs through to 2035/36, as well as cost increases across the period 2026/27 to 2034/35. The most significant increases in running costs are associated with Home Office Digital and Customer Services, reflecting updated delivery assumptions and the ongoing operation of the service.","benefits":13047.81,"benefitsNarrative":"Compared with Q4 2024/25, the programme’s departmentally agreed benefits at Q4 2025/26 (measured in £m) have decreased from £13,681m to £13,208m. This reflects the approval of the FBIS Programme Business Case (PBC) 2025 by HM Treasury in July 2025, which reset the departmental baseline for benefits from FY 2025/26 onwards. As part of the updated business case, a number of benefits previously included in the PBC 2024 baseline were treated as realised or sunk. This includes areas such as eVisa operational efficiencies, Detention and Workforce operational efficiencies, commercial savings, and reductions in eVisa call centre demand. As a result, these benefits are no longer reflected in the forward-looking baseline reported through GMPP, leading to an overall reduction in the total benefits figure.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the ongoing key risk in the plan; limited contingency. Any significant slippage will need clear prioritisation decisions. Compared with Q4 2024/25, the project’s end date at Q4 2025/26 remains unchanged at 31…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared with Q4 2024/25, the project’s end date at Q4 2025/26 remains unchanged at 31 March 2027. This reflects the position set out in the latest Programme Business Case, which did not seek to extend the approved delivery timeframe. The programme maintains a clear understanding of its scope and has established delivery plans to realise its intended benefits.","narrativeClaimKind":null}],"previous":{"id":"HO_0039_1920-Q4","year":2025,"name":"FUTURE BORDER AND IMMIGRATION SYSTEM PROGRAMME (FBIS)","department":"HO","category":"Government Transformation and Service Delivery","description":"FBIS puts customers at the heart of a firmer, fairer and easier to navigate border and immigration system. The FBIS Programme has been established to lead the design and delivery of the future system, improving security, efficiency and customer experience. The programmes top priorities include delivering eVisas, Electronic Travel Authorisation (ETAs), Sponsorship and Border Vision.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The FBIS delivery plan is ambitious with limited contingency; changes to the scope of the programme caused by the Immigration White Paper or global events will require prioritisation decisions against exiting commitments. eVisa delivery currently remains the programme’s top priority. However, there is a risk that lack of Digital, Data and Technology (DDaT) delivery capability required for this.","startDate":"2018-04-01","endDate":"2027-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2025 to 31/03/2027. This is primarily due to the following factors‚ Programme extension was to March 2027 has been approved by Home Office Investment Committee (InvestCo) and HMT with a new Business Case. This was to facilitate full delivery and benefit realisation of eVisa, ETA, Sponsorship and Border Vision.","fyBaseline":579.0,"fyForecast":457.4,"fyVariance":21.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ Underspending within the Programme Directorate, specifically Caseworking Capability, led to the budget variance.","wholeLifeCost":4536.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 3428 to 4536. This is primarily due to the following factors‚ On 12th of November 2024, the Programme Business Case (PBC) was signed off by HM Treasury (HMT). As such, the baseline figures have been updated in line with this.","benefits":13681.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) decreased from 40967 to 13681. This is primarily due to the following factors‚ In Q4 of FY 2023/24, the most recent FBIS Programme Business Case (PBC) approved by HM Treasury (HMT) was the 2021 version, which formed the basis for the GMPP baseline benefits at that time. On 12 November 2024, HMT approved the updated PBC 2024. As a result, the GMPP baseline benefits were revised to align with the newly agreed figures. From FY 2024/25 to FY 2033/34, the benefit baselines now reflect the data set out in the PBC 2024. A key change in the updated baselines is the inclusion of the Electronic Travel Authorisation (ETA) disbenefit, which had not been baselined in the PBC 2021 and was therefore previously excluded from GMPP reporting. Another key change includes the Wider Socio-Economic Impact benefits, which were not baselined in the PBC 2024 as they have been delivered by the Programme so are deemed sunk and as such have been removed from the annual benefit baselines. This adjustment resulted in a reduction in the Wider UK Public Economic baseline from FY 2024/25 to FY 2030/31.","themes":["Cost & funding","Delivery & schedule","Technical & integration","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The FBIS delivery plan is ambitious with limited contingency; changes to the scope of the programme caused by the Immigration White Paper or global events will…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2025 to 31/03/2027. This is primarily due to the following factors‚ Programme extension was to March 2027 has been approved by Home Office Investment Committee (InvestCo) and HMT with a new Business Case. This was to facilitate full delivery and benefit realisation of eVisa, ETA, Sponsorship and Border Vision.","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":0,"attentionScore":24,"attentionReasons":["Current published delivery confidence is Amber","In-year forecast variance is +18.1%"]},{"id":"DEFRA_0014_2021-Q4","year":2026,"name":"NO2 PROGRAMME","department":"DEFRA","category":"Infrastructure and Construction","description":"Government is legally mandated to deliver Nitrogen dioxide (NO2) compliance in the shortest possible time. The Joint Air Quality Unit delivers the NO2 Programme and is jointly accountable to Defra and DfT, including joint Ministerial, Senior Responsible Officer and funding responsibilities. The Programme collaborates with 64 local authorities to fund and deliver measures to secure compliant NO2 levels, including through Clean Air Zones alongside DVLA. National Highways is delivering measures targeting compliance on the Strategic Road Network.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA Delivery Confidence Assessment rating at 25/26 Q4 increased from RED to AMBER. This is primarily due to all the recommendations from the NISTA Gate 5 review having been addressed and evidenced and the programme being ready for transition to business as usual and coming off GMPP at the end of 25/26. Six were agreed as closed and the remaining two will be closed as part of final programme closure and transition activities. NISTA confirmed that the Programme was removed from the GMPP on 31 March.","startDate":"2016-01-01","endDate":"2026-03-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 was revised to 31/03/26. This is primarily due to funding constraints, lack of new measures, progress to date and wider improvements in vehicle fleet. Defra’s Investment Committee agreed in April 2025 to ‘careful closure’ of the programme, acknowledging the programme successes.","fyBaseline":15.13,"fyForecast":12.63,"fyVariance":16.52,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to delays in finalising remaining local authority clean air plans within the year, and savings resulting from negotiating cheaper air quality monitoring and modelling contracts. Also, lower revenue has been received from local authorities using the central Clean Air Zones service. The lower revenue represents a positive sign that NO2 measures are working because fewer non-compliant vehicles are driving through Clean Air Zones.","wholeLifeCost":843.04,"costNarrative":"Compared to financial year 24/25-Q4, the programme’s departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) decreased to 678. This was due to less funding being secured through the Spending Review and business planning rounds because the additional measures identified to date were unlikely to bring forward compliance with legal air quality limits. The reduced programme budget based on the SR25 settlement was £706m (£441m CDEL and £265m RDEL) over the SR period (up to FY29/30). The actual expenditure of the programme at the end of financial year 25/26 when it exited the GMPP is £678 million. This excludes the cost of measures to be agreed for Stoke’s Clean Air Plan. NO2 work which is carrying on through business-as-usual teams in Defra and DfT from FY26/27 onwards has budget allocation in line with 2025 Business Planning in both departments. This will not be reported in GMPP.","benefits":null,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to benefits not being monetised at programme level. Benefits assessment work is currently being undertaken, and a comprehensive evaluation programme is underway. A series of annual reports have been published on GOV.UK which demonstrate the progress and key findings from the evaluation.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA Delivery Confidence Assessment rating at 25/26 Q4 increased from RED to AMBER. This is primarily due to all the recommendations from the NISTA Gate 5 review having been addressed and evidenced and the programme being ready for transition to business as usual and coming off GMPP at the end of 25/26. Six were…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 was revised to 31/03/26. This is primarily due to funding constraints, lack of new measures, progress to date and wider improvements in vehicle fleet. Defra’s Investment Committee agreed in April 2025 to ‘careful closure’ of the programme, acknowledging the programme successes.","narrativeClaimKind":null,"history":[{"id":"DEFRA_0014_2021-Q4","year":2021,"name":"NO2 Reduction","department":"DEFRA & DFT","category":"Infrastructure and Construction","description":"The NO2 reduction programme is a joint programme with Department for Transport to deliver Nitrogen Dioxide (NO2) levels within legal limits in the shortest time possible. The NO2 reduction programme aims to deliver the 2017 UK plan for tackling roadside nitrogen dioxide concentrations and contributes to the Government ambition for a better environment and cleaner air.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Legal sensitivity�around this programme along with the impacts of COVID-19 re-prioritisation prevented the IPA from providing a complete�and independent�assessment.","startDate":"2016-01-01","endDate":"2027-12-31","scheduleNarrative":"The project end-date is 31 December 2027. This is primarily due to the following factors: The development of NO2 reduction plans in 2020 was impacted by COVID-19 and a number of local authorities have revised their schedules as a result. The first Clean Air Zone in Bath launched on 15 March 2021. The NO2 programme is legally mandated to deliver compliance with NO2 legal limits in the shortest time possible. The programme team works very closely with local authorities who have exceedances across England to develop and implement NO2 reduction plans.","fyBaseline":289.0,"fyForecast":151.5,"fyVariance":-48.0,"varianceNarrative":"The budget variance exceeds 5%. The NO2 programme is supporting Local Authorities to develop and implement measures to address NO2 roadside exceedances. Funding has been provided to Local Authorities to deliver the necessary reductions to tackle NO2 over the lifetime of the project. Due to COVID-19 there have been delays to local authority spending, resulting in an underspend.","wholeLifeCost":880.0,"costNarrative":"The projects Baseline Whole Life Cost is �880.00m. This is primarily due to the following factors: Programme costs relate to the development of NO2 reduction plans by local authorities who have exceedances, implementation of NO2 reduction plans, project costs for the central Clean Air Zone service, and modelling, monitoring and evaluation.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding"],"evidenceExcerpt":"Legal sensitivity�around this programme along with the impacts of COVID-19 re-prioritisation prevented the IPA from providing a complete�and independent�assessment. The project end-date is 31 December 2027. This is primarily due to the following factors: The development of NO2 reduction plans in 2020 was impacted by COVID-19 and a number of local…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project end-date is 31 December 2027. This is primarily due to the following factors: The development of NO2 reduction plans in 2020 was impacted by COVID-19 and a number of local authorities have revised their schedules as a result. The first Clean Air Zone in Bath launched on 15 March 2021. The NO2 programme is legally mandated to deliver compliance with NO2 legal limits in the shortest time possible. The programme team works very closely with local authorities who have exceedances across England to develop and implement NO2 reduction plans.","narrativeClaimKind":null},{"id":"DEFRA_0014_2021-Q4","year":2022,"name":"NO2 Programme","department":"DEFRA","category":"Infrastructure and Construction","description":"The NO2 reduction programme is a joint programme with Department for Transport to deliver the 2017 UK Plan for Tackling Roadside Nitrogen Dioxide Concentrations. The Plan outlines how councils with NO2 levels exceeding legal limits must develop and implement local plans to deliver legal levels of NO2 in the shortest time possible.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 decreased from Amber/red to Amber Overall good progress has been made against all six IPA actions. The SRO appointment letter for joint-SRO leadership is pending publication. Policy work continues with DfT National Highways (NH) client team to consider further options and mitigations to target NO2 exceedances on the Strategic Road Network. Resource capacity is regularly reviewed within the Programme by the Programme Director alongside the SROs. All communication products are under review expected in Spring 2022.","startDate":"2016-01-01","endDate":"2027-12-31","scheduleNarrative":"Compared to 2021-Q4, your project end-date remained scheduled to finish on 31 DEC 2027 . This is primarily due to the following factors: The NO2 programme is legally mandated to deliver compliance with NO2 legal limits in the shortest time possible. The programme team works with local authorities across England who have exceedances to develop and implement local NO2 reduction plans through a variety of interventions. Confidence in the launch and delivery of Clean Air Zones (CAZ) has increased following successful delivery of Bath and North East Somerset (BaNES), Birmingham and Portsmouth CAZs in 2021. In February 2022, Ministers granted permission for Greater Manchester to pause implementation of their CAZ and submit revised plans by July 2022. The programme team continue to work with Greater Manchester to continue engagement and meet legal obligations. The operational service ownership of the CAZ service successfully transitioned from JAQU to DVLA in February 2022.","fyBaseline":44.8,"fyForecast":43.8,"fyVariance":-2.0,"varianceNarrative":"The budget variance is inferior or equal to 5%. The NO2 programme is supporting local authorities to develop and implement measures to address NO2 roadside exceedances. Funding has been provided to local authorities to deliver the necessary reductions to tackle NO2 over the lifetime of the programme. There have been delays to local authority plans in 21/22 resulting in an underspend this year. The 21/22 baseline was updated in year, to reflect underspends as agreed with HMT and these figures were allowed for in SR21 budgets for the NO2 programme.","wholeLifeCost":885.0,"costNarrative":"Compared to2021-Q4, the projects Baseline Whole Life Cost increased from 880.00 (£m) to 884.80 (£m). This is primarily due to the following factors: Compared to 2021-Q4, the projects Baseline Whole Life Cost increased from 880.00 (£m) to 884.48 (£m). This is due to rounding rather than an increase in costs.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 decreased from Amber/red to Amber Overall good progress has been made against all six IPA actions. The SRO appointment letter for joint-SRO leadership is pending publication. Policy work continues with DfT National Highways (NH)…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to 2021-Q4, your project end-date remained scheduled to finish on 31 DEC 2027 . This is primarily due to the following factors: The NO2 programme is legally mandated to deliver compliance with NO2 legal limits in the shortest time possible. The programme team works with local authorities across England who have exceedances to develop and implement local NO2 reduction plans through a variety of interventions. Confidence in the launch and delivery of Clean Air Zones (CAZ) has increased following successful delivery of Bath and North East Somerset (BaNES), Birmingham and Portsmouth CAZs in 2021. In February 2022, Ministers granted permission for Greater Manchester to pause implementation of their CAZ and submit revised plans by July 2022. The programme team continue to work with Greater Manchester to continue engagement and meet legal obligations. The operational service ownership of the CAZ service successfully transitioned from JAQU to DVLA in February 2022.","narrativeClaimKind":null},{"id":"DEFRA_0014_2021-Q4","year":2023,"name":"NO2 Programme","department":"DEFRA","category":"Infrastructure and Construction","description":"The NO2 reduction programme is a joint programme with the Department for Transport to deliver the 2017 UK Plan for Tackling Roadside Nitrogen Dioxide Concentrations. The Plan outlines how councils with NO2 levels exceeding legal limits must develop and implement local plans to deliver legal levels of NO2 in the shortest time possible.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. Good progress has made against all previous IPA recommendations. The most recent IPA review of the programme was in March 2023 and actions against each recommendation from this review are being taken forward. Overall the NO2 Programme continues to deliver mitigations alongside Local Authorities and remains at Amber.","startDate":"2016-01-01","endDate":"2027-12-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2027-12-31. This is primarily due to the following factors. The NO2 programme is legally mandated to deliver compliance with NO2 legal limits in the shortest time possible. The programme team works with local authorities across England who have exceedances to develop and implement local NO2 reduction plans through a variety of interventions. In 2022/23 four further Clean Air Zones were successfully launched in Bradford, Bristol, Tyneside and Sheffield to help reduce NO2 levels in the cities. In February 2022, Ministers granted permission for Greater Manchester to pause implementation of their Clean Air Zone and submit revised plans. The programme team continues to work with Greater Manchester to continue engagement and meet legal obligations. Comprehensive monitoring and evaluation arrangements are in place to assess whether local authorities are on track to reduce NO2 levels in the timeframe expected and consider appropriate remedial action if they are not. The programme team also continues to work closely with National Highways to address NO2 exceedances on the Strategic Road Network.","fyBaseline":189.3,"fyForecast":43.4,"fyVariance":-77.0,"varianceNarrative":"The budget variance exceeds 5%. The NO2 programme is supporting local authorities to develop and implement measures to address NO2 roadside exceedances. Funding has been provided to local authorities to deliver the necessary reductions to tackle NO2 over the lifetime of the programme. There have continued to be delays in agreeing local authority plans resulting in an underspend this year. The 22/23 baseline was updated in year, to reflect underspends as agreed with HMT and these figures were allowed for in SR21 budgets for the NO2 programme.","wholeLifeCost":883.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 decreased from 885m. to 883m. This is primarily due to the following factors. 80 (m) to 883.00 (m). This is due to rounding rather than a decrease in costs.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. The project did not provide departmental-agree monetised benefits at 22/23-Q4.The project did not provide departmental-agree monetised benefits at 22/23-Q4.The project did not provide departmental-agree monetised benefits at 22/23-Q4. The primary benefit of the NO2 programme is reduced NO2 levels leading to a positive impact on public health. There is comprehensive monitoring and evaluation in place to track and manage the realisation of benefits from the programme.","themes":["Cost & funding","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. Good progress has made against all previous IPA recommendations. The most recent IPA review of the programme was in March 2023 and actions against each recommendation…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2027-12-31. This is primarily due to the following factors. The NO2 programme is legally mandated to deliver compliance with NO2 legal limits in the shortest time possible. The programme team works with local authorities across England who have exceedances to develop and implement local NO2 reduction plans through a variety of interventions. In 2022/23 four further Clean Air Zones were successfully launched in Bradford, Bristol, Tyneside and Sheffield to help reduce NO2 levels in the cities. In February 2022, Ministers granted permission for Greater Manchester to pause implementation of their Clean Air Zone and submit revised plans. The programme team continues to work with Greater Manchester to continue engagement and meet legal obligations. Comprehensive monitoring and evaluation arrangements are in place to assess whether local authorities are on track to reduce NO2 levels in the timeframe expected and consider appropriate remedial action if they are not. The programme team also continues to work closely with National Highways to address NO2 exceedances on the Strategic Road Network.","narrativeClaimKind":null},{"id":"DEFRA_0014_2021-Q4","year":2024,"name":"NO2 Programme","department":"DEFRA","category":"Infrastructure and Construction","description":"The NO2 reduction programme is a joint programme with the Department for Transport to deliver the 2017 UK Plan for Tackling Roadside Nitrogen Dioxide Concentrations. The Plan outlines how councils with NO2 levels exceeding legal limits must develop and implement local plans to deliver legal levels of NO2 in the shortest time possible.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 22/23-Q4, the Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber(SRO rating). This is primarily due to the following factors. Good progress has made against all previous IPA recommendations. The most recent IPA review of the programme was in March 2023 and actions against each recommendation from this review are being taken forward. The next IPA review will take place in April 2024. Overall the NO2 Programme continues to deliver mitigations alongside Local Authorities and remains at Amber.","startDate":"2016-01-01","endDate":"2027-12-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2027-12-31. This is primarily due to the following factors. The NO2 programme is legally mandated to deliver compliance with NO2 legal limits in the shortest time possible. The programme team works with local authorities across England who have exceedances to develop and implement local NO2 reduction plans through a variety of interventions. Seven Clean Air Zones have been launched as part of the programme to help reduce NO2 levels. In February 2022, Ministers granted permission for Greater Manchester to pause implementation of their Clean Air Zone and revised plans were submitted to Government in December 2023. The programme team will respond to Greater Manchester in due course. Comprehensive monitoring and evaluation arrangements are in place to assess whether local authorities are on track to reduce NO2 levels in the timeframe expected and consider appropriate remedial action if they are not. The programme team also continues to work closely with National Highways to address NO2 exceedances on the Strategic Road Network.","fyBaseline":43.5,"fyForecast":20.3,"fyVariance":-53.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The NO2 programme is supporting local authorities to develop and implement measures to address NO2 roadside exceedances. Funding has been provided to local authorities to deliver the necessary reductions to tackle NO2 over the lifetime of the programme. There have continued to be delays in agreeing local authority plans resulting in reprofiling of spend across years and a budget variance exceeding 5%. This has been managed in year with DfT and Defra finance teams. The programme remains within its overall budget envelope .","wholeLifeCost":883.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 remained at 883m. This is primarily due to the following factors. The projects Baseline Whole Life Cost remains at 883.00 (m).","benefits":0.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 0m. The primary benefit of the NO2 programme is reduced NO2 levels leading to a positive impact on public health. There is comprehensive monitoring and evaluation in place to track and manage the realisation of benefits from the programme.","themes":["Cost & funding","Governance & assurance","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber(SRO rating). This is primarily due to the following factors. Good progress has made against all previous IPA recommendations. The most recent IPA review of the programme was in March 2023 and actions against each recommendation from this review are…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2027-12-31. This is primarily due to the following factors. The NO2 programme is legally mandated to deliver compliance with NO2 legal limits in the shortest time possible. The programme team works with local authorities across England who have exceedances to develop and implement local NO2 reduction plans through a variety of interventions. Seven Clean Air Zones have been launched as part of the programme to help reduce NO2 levels. In February 2022, Ministers granted permission for Greater Manchester to pause implementation of their Clean Air Zone and revised plans were submitted to Government in December 2023. The programme team will respond to Greater Manchester in due course. Comprehensive monitoring and evaluation arrangements are in place to assess whether local authorities are on track to reduce NO2 levels in the timeframe expected and consider appropriate remedial action if they are not. The programme team also continues to work closely with National Highways to address NO2 exceedances on the Strategic Road Network.","narrativeClaimKind":null},{"id":"DEFRA_0014_2021-Q4","year":2025,"name":"NO2 PROGRAMME","department":"DEFRA","category":"Infrastructure and Construction","description":"Government is legally mandated to deliver Nitrogen dioxide (NO2) compliance in the shortest possible time. The Joint Air Quality Unit delivers the NO2 Programme and is jointly accountable to Defra and DfT, including joint Ministerial, Senior Responsible Officer and funding responsibilities. The Programme collaborates with 64 local authorities to fund and deliver measures to secure compliant NO2 levels, including through Clean Air Zones alongside DVLA. National Highways is delivering measures targeting compliance on the Strategic Road Network.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 decreased from AMBER to RED. This is primarily due to uncertainty surrounding future zero emission bus funding, as well as challenges in identifying additional measures within local authorities that are not currently on track to achieve compliance with NO2 limit levels in the timeframe expected.","startDate":"2016-01-01","endDate":"2027-12-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/12/2027. This is primarily due to the NO2 programme being legally mandated to deliver compliance with NO2 limit levels in the shortest time possible. The programme team works closely with local authorities who have exceedances across England to develop and implement NO2 reduction plans.","fyBaseline":12.4,"fyForecast":8.4,"fyVariance":32.26,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to delays in finalising remaining local authority clean air plans within the year. Also, lower revenue has been received from local authorities using the central Clean Air Zones service. However the lower revenue represents a positive sign that NO2 measures are working because fewer non-compliant vehicles are driving through Clean Air Zones.","wholeLifeCost":883.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 883. This is primarily due to the following factor‚ - the Whole Life Cost is subject to outcomes from the Spending Review and has remained at £883m until this is concluded.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to benefits not being monetised at programme level. Benefits assessment work is currently being undertaken and a comprehensive evaluation programme is underway. A series of annual reports have been published on gov.uk which demonstrate the progress and key findings from the evaluation.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 decreased from AMBER to RED. This is primarily due to uncertainty surrounding future zero emission bus funding, as well as challenges in identifying additional measures within local authorities that are not currently on track to…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/12/2027. This is primarily due to the NO2 programme being legally mandated to deliver compliance with NO2 limit levels in the shortest time possible. The programme team works closely with local authorities who have exceedances across England to develop and implement NO2 reduction plans.","narrativeClaimKind":null},{"id":"DEFRA_0014_2021-Q4","year":2026,"name":"NO2 PROGRAMME","department":"DEFRA","category":"Infrastructure and Construction","description":"Government is legally mandated to deliver Nitrogen dioxide (NO2) compliance in the shortest possible time. The Joint Air Quality Unit delivers the NO2 Programme and is jointly accountable to Defra and DfT, including joint Ministerial, Senior Responsible Officer and funding responsibilities. The Programme collaborates with 64 local authorities to fund and deliver measures to secure compliant NO2 levels, including through Clean Air Zones alongside DVLA. National Highways is delivering measures targeting compliance on the Strategic Road Network.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA Delivery Confidence Assessment rating at 25/26 Q4 increased from RED to AMBER. This is primarily due to all the recommendations from the NISTA Gate 5 review having been addressed and evidenced and the programme being ready for transition to business as usual and coming off GMPP at the end of 25/26. Six were agreed as closed and the remaining two will be closed as part of final programme closure and transition activities. NISTA confirmed that the Programme was removed from the GMPP on 31 March.","startDate":"2016-01-01","endDate":"2026-03-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 was revised to 31/03/26. This is primarily due to funding constraints, lack of new measures, progress to date and wider improvements in vehicle fleet. Defra’s Investment Committee agreed in April 2025 to ‘careful closure’ of the programme, acknowledging the programme successes.","fyBaseline":15.13,"fyForecast":12.63,"fyVariance":16.52,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to delays in finalising remaining local authority clean air plans within the year, and savings resulting from negotiating cheaper air quality monitoring and modelling contracts. Also, lower revenue has been received from local authorities using the central Clean Air Zones service. The lower revenue represents a positive sign that NO2 measures are working because fewer non-compliant vehicles are driving through Clean Air Zones.","wholeLifeCost":843.04,"costNarrative":"Compared to financial year 24/25-Q4, the programme’s departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) decreased to 678. This was due to less funding being secured through the Spending Review and business planning rounds because the additional measures identified to date were unlikely to bring forward compliance with legal air quality limits. The reduced programme budget based on the SR25 settlement was £706m (£441m CDEL and £265m RDEL) over the SR period (up to FY29/30). The actual expenditure of the programme at the end of financial year 25/26 when it exited the GMPP is £678 million. This excludes the cost of measures to be agreed for Stoke’s Clean Air Plan. NO2 work which is carrying on through business-as-usual teams in Defra and DfT from FY26/27 onwards has budget allocation in line with 2025 Business Planning in both departments. This will not be reported in GMPP.","benefits":null,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to benefits not being monetised at programme level. Benefits assessment work is currently being undertaken, and a comprehensive evaluation programme is underway. A series of annual reports have been published on GOV.UK which demonstrate the progress and key findings from the evaluation.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA Delivery Confidence Assessment rating at 25/26 Q4 increased from RED to AMBER. This is primarily due to all the recommendations from the NISTA Gate 5 review having been addressed and evidenced and the programme being ready for transition to business as usual and coming off GMPP at the end of 25/26. Six were…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 was revised to 31/03/26. This is primarily due to funding constraints, lack of new measures, progress to date and wider improvements in vehicle fleet. Defra’s Investment Committee agreed in April 2025 to ‘careful closure’ of the programme, acknowledging the programme successes.","narrativeClaimKind":null}],"previous":{"id":"DEFRA_0014_2021-Q4","year":2025,"name":"NO2 PROGRAMME","department":"DEFRA","category":"Infrastructure and Construction","description":"Government is legally mandated to deliver Nitrogen dioxide (NO2) compliance in the shortest possible time. The Joint Air Quality Unit delivers the NO2 Programme and is jointly accountable to Defra and DfT, including joint Ministerial, Senior Responsible Officer and funding responsibilities. The Programme collaborates with 64 local authorities to fund and deliver measures to secure compliant NO2 levels, including through Clean Air Zones alongside DVLA. National Highways is delivering measures targeting compliance on the Strategic Road Network.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 decreased from AMBER to RED. This is primarily due to uncertainty surrounding future zero emission bus funding, as well as challenges in identifying additional measures within local authorities that are not currently on track to achieve compliance with NO2 limit levels in the timeframe expected.","startDate":"2016-01-01","endDate":"2027-12-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/12/2027. This is primarily due to the NO2 programme being legally mandated to deliver compliance with NO2 limit levels in the shortest time possible. The programme team works closely with local authorities who have exceedances across England to develop and implement NO2 reduction plans.","fyBaseline":12.4,"fyForecast":8.4,"fyVariance":32.26,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to delays in finalising remaining local authority clean air plans within the year. Also, lower revenue has been received from local authorities using the central Clean Air Zones service. However the lower revenue represents a positive sign that NO2 measures are working because fewer non-compliant vehicles are driving through Clean Air Zones.","wholeLifeCost":883.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 883. This is primarily due to the following factor‚ - the Whole Life Cost is subject to outcomes from the Spending Review and has remained at £883m until this is concluded.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to benefits not being monetised at programme level. Benefits assessment work is currently being undertaken and a comprehensive evaluation programme is underway. A series of annual reports have been published on gov.uk which demonstrate the progress and key findings from the evaluation.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 decreased from AMBER to RED. This is primarily due to uncertainty surrounding future zero emission bus funding, as well as challenges in identifying additional measures within local authorities that are not currently on track to…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/12/2027. This is primarily due to the NO2 programme being legally mandated to deliver compliance with NO2 limit levels in the shortest time possible. The programme team works closely with local authorities who have exceedances across England to develop and implement NO2 reduction plans.","narrativeClaimKind":null},"ratingDelta":-1,"transition":"Improved","endDateDeltaDays":-640,"attentionScore":24,"attentionReasons":["Current published delivery confidence is Amber","In-year forecast variance is +16.5%"]},{"id":"MOD_0119_1920-Q2","year":2026,"name":"ARMED FORCES RECRUITING PROGRAMME","department":"MOD","category":"Military Capability","description":"The Armed Forces Recruiting Programme is the Tri-Service programme responsible for delivering a single, common Tri-Service Recruiting Operating Model for the Armed Forces. The Programme seeks to bring the three single Service recruiting activities together under one future recruiting service with a commercial partner and a single digital platform.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors. 1.The level of risk being carried with respect to the novel collaborative delivery of technical solution and data migration. 2. Delivery of some aspects of the service not progressing as initially planned, requiring joint risk mitigation and re-planning to be pursued. 3. Continued challenges in aggregating information to allow for improved tracking of progress against the delivery of this complex programme.","startDate":"2018-03-15","endDate":"2028-04-30","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same at 30/04/2028. This is primarily due to the following factors. 1. Timely approval of the Full Business Case and contract let with Team Serco that includes a phased transition from the contract becoming effective in April 2025 and allowing to progress to Full Solution Implementation in October 2027.","fyBaseline":50.89,"fyForecast":42.62,"fyVariance":16.24,"varianceNarrative":"The in-year variance exceeds 5%. This is primarily due to the following factors. 1. A review of FY25/26 forecast activity identified an £8.5M underspend generated by the the contingency provision not being required.","wholeLifeCost":201.02,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 has marginally increased from £194.96M to £195.05M. This is primarily due to the following factors. 1. The WLC figures include the Feasibility, Assessment and Transition phases. The funding for the Assessment phase reflected an earlier approval of funding plus civilian workforce costs which are not included in the original Approved Budgetary Level. 2. The AFRP Full Business Case was approved 31 January 2025 providing endorsement of a revised baseline of £2,258M for a 2-year transition period, 7 year core delivery contract and 3 x potential option years. £135.1M of this approval relates to the programme transition years, which have been included in the reported figures.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. There are no monetised benefits.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors. 1.The level of risk being carried with respect to the novel collaborative delivery of technical solution and data migration. 2. Delivery of some aspects of the service not progressing…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same at 30/04/2028. This is primarily due to the following factors. 1. Timely approval of the Full Business Case and contract let with Team Serco that includes a phased transition from the contract becoming effective in April 2025 and allowing to progress to Full Solution Implementation in October 2027.","narrativeClaimKind":null,"history":[{"id":"MOD_0119_1920-Q2","year":2020,"name":"Armed Forces Recruitment Project","department":"MOD","category":"Military Capability","description":"The Armed Forces Recruiting Programme (AFRP) is the tri-Service (tS) programme responsible for delivering a single, common tS Recruiting Op Model for the Armed Forces.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber/Red, due primarily to the following factors; - The IPA Review DCA in March 19 acknowledged that progress had been made in developing deliverable options but the full scope of the programme was unachievable in the original mandated timeframe. - At the time of the IPA review DCA the programme was being re-baselined to reflect an achievable timeframe with the required additional resourcing, this gave enough confidence to reflect an Amber / Red confidence delivery. Since the Q2 1920 (30th September 2019) Amber/Red IPA DCA, the following non-project operating environment activities have impacted the original Q2 IPA DCA; - The Programme Assessment Review held in Oct 19 upgraded the review to Amber with a re-baseline of activity with a deliverable option for an Initial Operating Capability (IOC) of Mar 24. Since the Q2 1920 (30th September 2019) Amber/Red IPA DCA, the following primary project actions have impacted the original Q2 IPA DCA; - The Initial Gate Business Case has received IAC approval for an Initial Operating Capability revised schedule of Mar 24. Ministerial approval was granted in Mar 20 & Cabinet Office / HM Treasury Approval in May 20.","startDate":"2018-03-15","endDate":"2023-02-01","scheduleNarrative":"The scheduled project end date at Q2 1920 (30th September 2019) is 01/02/23, due primarily to the following factors; - The schedule of Initial Operating Capability in Feb 23 allowed 13 months for transition to Full Operating Capability of Mar 24. As highlighted in the DCA Review the timeline was unachievable and required re-baselining. - The schedule has been re-baselined contract let still remains as Mar 23 for an Initial Operating Capability of Mar 24, with Full Operating Capability to follow. Since the Q2 1920 (30th September 2019) baseline project end date of 01/02/23, the following non-project operating environment activities have impacted the original Q2 baseline project end date; - The Initial Gate Business Case has received Investment Approvals Committee approval for an Initial Operating Capability revised schedule of Mar 24. Ministerial approval was granted in Mar 20 & Cabinet Office / HM Treasury Approval in May 20.","fyBaseline":5.1,"fyForecast":5.1,"fyVariance":0.0,"varianceNarrative":"Budget variance less than 5%","wholeLifeCost":1730.24,"costNarrative":"The baseline Whole Life Cost at Q2 1920 (30th September 2019) is �1,730.24 m, due primarily to the following factors; - The programme has been directed to not exceed the current cost of the three current single Service systems.","benefits":null,"benefitsNarrative":"","themes":["Approvals & decisions","Workforce & capability","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber/Red, due primarily to the following factors; - The IPA Review DCA in March 19 acknowledged that progress had been made in developing deliverable options but the full scope of the programme was unachievable in the original mandated timeframe. - At the time of the…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2020","sourceLabel":"IPA Annual Report 2019-20","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The scheduled project end date at Q2 1920 (30th September 2019) is 01/02/23, due primarily to the following factors; - The schedule of Initial Operating Capability in Feb 23 allowed 13 months for transition to Full Operating Capability of Mar 24. As highlighted in the DCA Review the timeline was unachievable and required re-baselining. - The schedule has been re-baselined contract let still remains as Mar 23 for an Initial Operating Capability of Mar 24, with Full Operating Capability to follow. Since the Q2 1920 (30th September 2019) baseline project end date of 01/02/23, the following non-project operating environment activities have impacted the original Q2 baseline project end date; - The Initial Gate Business Case has received Investment Approvals Committee approval for an Initial Operating Capability revised schedule of Mar 24. Ministerial approval was granted in Mar 20 & Cabinet Office / HM Treasury Approval in May 20.","narrativeClaimKind":null},{"id":"MOD_0119_1920-Q2","year":2021,"name":"Armed Forces Recruitment Programme","department":"MOD","category":"Military Capability","description":"The Armed Forces Recruiting Programme is the Tri-Service programme responsible for delivering a single, common Tri-Service Recruiting Operating Model for the Armed Forces.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating decreased from Amber/Red to Amber. This is primarily due to the following factors: The Armed Forces Recruiting Programme's previous Infrastructure and Projects Authority Gateway Assurance Review took place in June 2020 and resulting in an Amber/Red rating in Delivery Confidence. Following this the Armed Forces Recruiting Programme undertook an Assurance of Action Plan in November which resulted in a revised rating of Amber. Successful delivery appears feasible but three significant issues already exist requiring management attention but AFRP have an assured action plan to address them. - Commercial resourcing/integration; - Key Performance Iindicators development to frame the procurement; and, - Drawing the baseline cost model to completion (including cashability).","startDate":"2018-03-15","endDate":"2024-09-30","scheduleNarrative":"Compared to financial year 19/20-Q2, the project's end-date increased from 01 February 2023 to 30 September 2024 . This is primarily due to the following factors: The Defence Board directed change in the scope of the programme from a single Service to Tri-Service recruiting programme impacted on delivery dates. The Investment Approvals Commitee recommended in November 19 a delivery date move from April 22 to April 24, Project end-date is expected to be a minimum of 6 months after delivery based on lessons learned from other large outsourcing programmes within the Ministry of Defence.","fyBaseline":7.36,"fyForecast":7.82,"fyVariance":6.0,"varianceNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"","themes":["Delivery & schedule","Commercial & supply chain","Cost & funding","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating decreased from Amber/Red to Amber. This is primarily due to the following factors: The Armed Forces Recruiting Programme's previous Infrastructure and Projects Authority Gateway Assurance Review took place in June 2020 and resulting in an…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 19/20-Q2, the project's end-date increased from 01 February 2023 to 30 September 2024 . This is primarily due to the following factors: The Defence Board directed change in the scope of the programme from a single Service to Tri-Service recruiting programme impacted on delivery dates. The Investment Approvals Commitee recommended in November 19 a delivery date move from April 22 to April 24, Project end-date is expected to be a minimum of 6 months after delivery based on lessons learned from other large outsourcing programmes within the Ministry of Defence.","narrativeClaimKind":null},{"id":"MOD_0119_1920-Q2","year":2022,"name":"Armed Forces Recruiting Programme","department":"MOD","category":"Military Capability","description":"The Armed Forces Recruiting Programme is the Tri-Service programme responsible for delivering a single, common Tri-Service Recruiting Operating Model for the Armed Forces.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber. This is primarily due to the following factors: While delivery confidence is stable at Amber, active risk management of programme resourcing in highly skilled areas that are in sector wide shortages remains.","startDate":"2018-03-15","endDate":"2024-09-30","scheduleNarrative":"Compared to 2021-Q4, the project end-date remained scheduled to finish on 30 September 2024.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"","themes":["Commercial & supply chain","Delivery & schedule","Cost & funding","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber. This is primarily due to the following factors: While delivery confidence is stable at Amber, active risk management of programme resourcing in highly skilled areas that are in sector wide shortages remains. Compared to…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to 2021-Q4, the project end-date remained scheduled to finish on 30 September 2024.","narrativeClaimKind":null},{"id":"MOD_0119_1920-Q2","year":2023,"name":"Armed Forces Recruiting Programme","department":"MOD","category":"Military Capability","description":"The Armed Forces Recruiting Programme is the Tri-Service programme responsible for delivering a single; common Tri-Service Recruiting Operating Model for the Armed Forces. The Programme seeks to bring the three single Service recruiting activities together under one future recruiting service with a commercial partner and a single digital platform.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. While the Delivery Confidence remains stable at Amber there is significant risk to this approach to recruitment into the Armed Forces, particularly during the transition phase.","startDate":"2018-03-15","endDate":"2024-09-30","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2024-09-30. This is primarily due to the following factors. Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This programme does not report cashable benefits. Its aim is to deliver the armed forces a single recruitment strategy and operating model.","themes":["Commercial & supply chain","Delivery & schedule","Cost & funding"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. While the Delivery Confidence remains stable at Amber there is significant risk to this approach to recruitment into the Armed Forces, particularly during the…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2024-09-30. This is primarily due to the following factors. Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","narrativeClaimKind":null},{"id":"MOD_0119_1920-Q2","year":2024,"name":"Armed Forces Recruiting Programme","department":"MOD","category":"Military Capability","description":"The Armed Forces Recruiting Programme is the Tri-Service programme responsible for delivering a single, common Tri-Service Recruiting Operating Model for the Armed Forces. The Programme seeks to bring the three single Service recruiting activities together under one future recruiting service with a commercial partner and a single digital platform.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure and Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The most recent IPA review (October 2023) resulted in an Amber rating. Progress against required actions related to governance and confirming delivery timescales was achieved in advance of this review and enabled a focus on business readiness to transition to the new service from Contract Award, April 2025. All recommended actions are now being undertaken by the programme team ahead of a provisional Gateway 3 Review in September 2024.","startDate":"2018-03-15","endDate":"2028-04-30","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained scheduled to finish on 2028-04-30. This is primarily due to the following factors. AFRP gained approval (June 2023) during the assessment phase through Review Note 2 to extend competitive dialogue, subsequent to this, the programme has established an updated plan that includes a phased contract transition from Contract Award (CA) in April 2025 through to October 2027. The programme is on track against this revised baseline, with key future activities being evaluation and moderation of final bids, leading into Full Business Case Approvals ahead of CA in April 2025.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":0.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 0m.","themes":["Commercial & supply chain","Governance & assurance","Approvals & decisions","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure and Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The most recent IPA review (October 2023) resulted in an Amber rating. Progress against required actions related to governance and confirming delivery timescales…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":true,"narrativeExcerpt":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained scheduled to finish on 2028-04-30. This is primarily due to the following factors. AFRP gained approval (June 2023) during the assessment phase through Review Note 2 to extend competitive dialogue, subsequent to this, the programme has established an updated plan that includes a phased contract transition from Contract Award (CA) in April 2025 through to October 2027. The programme is on track against this revised baseline, with key future activities being evaluation and moderation of final bids, leading into Full Business Case Approvals ahead of CA in April 2025.","narrativeClaimKind":"says-unchanged"},{"id":"MOD_0119_1920-Q2","year":2025,"name":"ARMED FORCES RECRUITING PROGRAMME","department":"MoD","category":"Military Capability","description":"The Armed Forces Recruiting Programme is the Tri-Service programme responsible for delivering a single, common Tri-Service Recruiting Operating Model for the Armed Forces. The Programme seeks to bring the three single Service recruiting activities together under one future recruiting service with a commercial partner and a single digital platform.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. The most recent Assurance Review (October 24) focused on confirming that the recommended investment decision in the Full Business Case is appropriate. This resulted in an Amber rating, consistent with the previous review (October 23).","startDate":"2018-03-15","endDate":"2028-04-30","scheduleNarrative":"Section 43 - Commercial interests","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 43 - Commercial interests, No","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Commercial & supply chain","Governance & assurance","Approvals & decisions","Cost & funding"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. The most recent Assurance Review (October 24) focused on confirming that the recommended investment decision in the Full Business Case is appropriate. This resulted in an Amber rating, consistent with…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Section 43 - Commercial interests","narrativeClaimKind":null},{"id":"MOD_0119_1920-Q2","year":2026,"name":"ARMED FORCES RECRUITING PROGRAMME","department":"MOD","category":"Military Capability","description":"The Armed Forces Recruiting Programme is the Tri-Service programme responsible for delivering a single, common Tri-Service Recruiting Operating Model for the Armed Forces. The Programme seeks to bring the three single Service recruiting activities together under one future recruiting service with a commercial partner and a single digital platform.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors. 1.The level of risk being carried with respect to the novel collaborative delivery of technical solution and data migration. 2. Delivery of some aspects of the service not progressing as initially planned, requiring joint risk mitigation and re-planning to be pursued. 3. Continued challenges in aggregating information to allow for improved tracking of progress against the delivery of this complex programme.","startDate":"2018-03-15","endDate":"2028-04-30","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same at 30/04/2028. This is primarily due to the following factors. 1. Timely approval of the Full Business Case and contract let with Team Serco that includes a phased transition from the contract becoming effective in April 2025 and allowing to progress to Full Solution Implementation in October 2027.","fyBaseline":50.89,"fyForecast":42.62,"fyVariance":16.24,"varianceNarrative":"The in-year variance exceeds 5%. This is primarily due to the following factors. 1. A review of FY25/26 forecast activity identified an £8.5M underspend generated by the the contingency provision not being required.","wholeLifeCost":201.02,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 has marginally increased from £194.96M to £195.05M. This is primarily due to the following factors. 1. The WLC figures include the Feasibility, Assessment and Transition phases. The funding for the Assessment phase reflected an earlier approval of funding plus civilian workforce costs which are not included in the original Approved Budgetary Level. 2. The AFRP Full Business Case was approved 31 January 2025 providing endorsement of a revised baseline of £2,258M for a 2-year transition period, 7 year core delivery contract and 3 x potential option years. £135.1M of this approval relates to the programme transition years, which have been included in the reported figures.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. There are no monetised benefits.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors. 1.The level of risk being carried with respect to the novel collaborative delivery of technical solution and data migration. 2. Delivery of some aspects of the service not progressing…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same at 30/04/2028. This is primarily due to the following factors. 1. Timely approval of the Full Business Case and contract let with Team Serco that includes a phased transition from the contract becoming effective in April 2025 and allowing to progress to Full Solution Implementation in October 2027.","narrativeClaimKind":null}],"previous":{"id":"MOD_0119_1920-Q2","year":2025,"name":"ARMED FORCES RECRUITING PROGRAMME","department":"MoD","category":"Military Capability","description":"The Armed Forces Recruiting Programme is the Tri-Service programme responsible for delivering a single, common Tri-Service Recruiting Operating Model for the Armed Forces. The Programme seeks to bring the three single Service recruiting activities together under one future recruiting service with a commercial partner and a single digital platform.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. The most recent Assurance Review (October 24) focused on confirming that the recommended investment decision in the Full Business Case is appropriate. This resulted in an Amber rating, consistent with the previous review (October 23).","startDate":"2018-03-15","endDate":"2028-04-30","scheduleNarrative":"Section 43 - Commercial interests","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 43 - Commercial interests, No","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Commercial & supply chain","Governance & assurance","Approvals & decisions","Cost & funding"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. The most recent Assurance Review (October 24) focused on confirming that the recommended investment decision in the Full Business Case is appropriate. This resulted in an Amber rating, consistent with…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Section 43 - Commercial interests","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":0,"attentionScore":23,"attentionReasons":["Current published delivery confidence is Amber","In-year forecast variance is +16.2%"]},{"id":"HO_0183_2223-Q3","year":2026,"name":"ASYLUM TRANSFORMATION PROGRAMME","department":"HO","category":"Government Transformation and Service Delivery","description":"The Asylum Transformation Programme is transforming people capabilities, process and technology underpinning the end to end asylum system, to create a flexible, sustainable and efficient system which has a transparent and outcome focussed customer journey, enabling strong partner and public trust and an improved colleague experience.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared with Q4 2024/25, the NISTA Delivery Confidence Assessment (DCA) rating for Q4 2025/26 remains Amber. This reflects continued delivery progress alongside a number of ongoing risks and dependencies. The programme has maintained good momentum across multiple projects, with progress against its strategic objectives continuing. However, challenges remain in relation to resourcing and prioritisation within key enabling functions on which the programme is dependent. These dependencies continue to require active management and mitigation to support successful programme delivery.","startDate":"2022-09-01","endDate":null,"scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same: 31st March 2027. This reflects the successful delivery to date and the confidence in future plans.","fyBaseline":80.01,"fyForecast":67.13,"fyVariance":16.1,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors; technical delays meant that spend was incurred later than expected. This was partly due to technical complexity which is inherent in some of the pioneering AI and automation work that the programme is delivering.","wholeLifeCost":429.95,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 increased from £362m to £431.78m. This is primarily due to an increase in programme scope for 25/26.","benefits":13059.47,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 increased from £2,748m to £13,153.14m. This is primarily due to the increase in programme scope for 25/26 to include Appeals-related projects; which brought a significant benefit. The Asylum Transformation Programme (ATP) has already delivered significant improvements in the UK asylum system; totalling over £1bn in benefits up to the end of 25/26.","themes":["Cost & funding","Delivery & schedule","Technical & integration","Scope & requirements"],"evidenceExcerpt":"Compared with Q4 2024/25, the NISTA Delivery Confidence Assessment (DCA) rating for Q4 2025/26 remains Amber. This reflects continued delivery progress alongside a number of ongoing risks and dependencies. The programme has maintained good momentum across multiple projects, with progress against its strategic objectives continuing. However, challenges…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same: 31st March 2027. This reflects the successful delivery to date and the confidence in future plans.","narrativeClaimKind":null,"history":[{"id":"HO_0183_2223-Q3","year":2024,"name":"Asylum & Protection Transformation Programme","department":"HO","category":"Government Transformation and Service Delivery","description":"The Asylum Transformation Programme is transforming people capabilities, process and technology underpinning asylum casework and asylum support and accommodation. The four strategic objectives of the programme are:_x000D_ 1. A flexible, sustainable and efficient system,_x000D_ 2. A transparent and outcome focused customer journey,_x000D_ 3. Strong partner and public trust,_x000D_ 4. Improved colleague experience._x000D_ _x000D_ The role of the Asylum Transformation Programme is to enhance the processing capabilities, societal value and cost-effectiveness of the Asylum System, enabling it ever-increasingly, to better meet the interests and concerns of the many stakeholders in UK asylum, now and in the future.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. The Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is due to a positive IPA Gate 0 review identifying the programme as Amber, in which it has been noted as a well run and committed programme, which has successfully delivered to date, but facing wider major strategic and contextual issues, affecting delivery confidence._x000D_ _x000D_ These include operational capacity to implement change, constrained capacity in technical enablers which is limiting the pace Programmes can develop technical solutions and deliver continuous improvement. As well as the capacity constraints anticipated to deliver alongside the Illegal Migration Act.","startDate":"2022-09-01","endDate":"2025-12-31","scheduleNarrative":"The project's end-date at 23/24-Q4 is 2025-12-31. This is primarily due to the following factors. The project's end-date at 23/24-Q4 is schedule to finish on 31 December 2025. This is primarily due to the following factors: of being in-line with our current delivery plans.","fyBaseline":172.4,"fyForecast":162.9,"fyVariance":-6.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The programme's budget variance exceeds 5%.","wholeLifeCost":441.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 23/24-Q4 is 441m. This is primarily due to the following factors. The whole life cost of the programme has been established following Green book principles. The forecasted whole life costs reflects the full programme scope including resource costs to deliver the projects and activities, capital costs, ongoing and run costs of future platforms, and significantly costs for the Dispersal Grants provided to Local Authorities who accommodate Asylum Seekers. The whole-life cost reported here, reflects the 23-24 Programme Business Case, and the programme is currently in the process of refreshing the Business Case for FY 24-25, where the whole life cost of the programme is anticipated to change. These changes will be reflected in next quarter reporting.","benefits":18143.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 18143m. The programme's forecasted benefits for the 10-year appraisal period are significant. They are largely driven by forecasted financial savings due to reduced hotel costs as a result of increased dispersal bed use, as well as financial efficiency savings due to faster processing of claims, and therefore, reduced accommodation and support spend. The benefits reported here, reflects the 23-24 Programme Business Case, and the programme is currently in the process of refreshing the Business Case for FY 24-25, where the benefits of the programme are anticipated to change. These changes will be reflected in next quarter reporting.","themes":["Cost & funding","Delivery & schedule","Workforce & capability","Technical & integration"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. The Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is due to a positive IPA Gate 0 review identifying the programme as Amber, in which it has been noted as a…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 23/24-Q4 is 2025-12-31. This is primarily due to the following factors. The project's end-date at 23/24-Q4 is schedule to finish on 31 December 2025. This is primarily due to the following factors: of being in-line with our current delivery plans.","narrativeClaimKind":null},{"id":"HO_0183_2223-Q3","year":2025,"name":"ASYLUM TRANSFORMATION PROGRAMME","department":"HO","category":"Government Transformation and Service Delivery","description":"The Asylum Transformation Programme is transforming people capabilities, process and technology underpinning asylum casework and asylum support and accommodation, to create a flexible, sustainable and efficient system which has a transparent and outcome focussed customer journey, enabling strong partner and public trust and an improved colleague experience.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ 1) Ongoing successful delivery against the strategic objectives including the successful design and pilot of AI tools to support caseworking, the delivery and implementation of an asylum support discontinuation and move on function, and the increase in occupancy of Dispersed Accommodation. 2) The acknowledgement that the programme continued to face challenges outside of it's control, including resource shortages of enabling functions due to competing priorities within the Home Office.","startDate":"2022-09-01","endDate":"2027-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/12/2026 to 31/03/2027. This is primarily due to the following factors‚ 1) Delivery of existing scope at a slower pace than anticipated due to resource restrictions of enabling resources. 2) A significant extension of the programme scope to cover additional projects as a result of the closure of another programme, as well as an increase scope to align with the new Government priorities.","fyBaseline":88.5,"fyForecast":40.1,"fyVariance":54.69,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ Delivery at a slower pace than anticipated due to resource restrictions.","wholeLifeCost":362.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 441 to 362. This is primarily due to the following factors‚ A change in programme scope from the FY23/24 to the FY 24/25, to see the removal of obtaining Dispersed Accommodation, and moved into Business as Usual.","benefits":2748.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) decreased from 18143 to 2748. This is primarily due to the following factors‚ A change in programme scope from the FY23/24 to the FY 24/25, to see the removal of obtaining Dispersed Accommodation, and moved into Business as Usual.","themes":["Delivery & schedule","Cost & funding","Scope & requirements","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ 1) Ongoing successful delivery against the strategic objectives including the successful design and pilot of AI tools to support caseworking, the delivery and…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/12/2026 to 31/03/2027. This is primarily due to the following factors‚ 1) Delivery of existing scope at a slower pace than anticipated due to resource restrictions of enabling resources. 2) A significant extension of the programme scope to cover additional projects as a result of the closure of another programme, as well as an increase scope to align with the new Government priorities.","narrativeClaimKind":null},{"id":"HO_0183_2223-Q3","year":2026,"name":"ASYLUM TRANSFORMATION PROGRAMME","department":"HO","category":"Government Transformation and Service Delivery","description":"The Asylum Transformation Programme is transforming people capabilities, process and technology underpinning the end to end asylum system, to create a flexible, sustainable and efficient system which has a transparent and outcome focussed customer journey, enabling strong partner and public trust and an improved colleague experience.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared with Q4 2024/25, the NISTA Delivery Confidence Assessment (DCA) rating for Q4 2025/26 remains Amber. This reflects continued delivery progress alongside a number of ongoing risks and dependencies. The programme has maintained good momentum across multiple projects, with progress against its strategic objectives continuing. However, challenges remain in relation to resourcing and prioritisation within key enabling functions on which the programme is dependent. These dependencies continue to require active management and mitigation to support successful programme delivery.","startDate":"2022-09-01","endDate":null,"scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same: 31st March 2027. This reflects the successful delivery to date and the confidence in future plans.","fyBaseline":80.01,"fyForecast":67.13,"fyVariance":16.1,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors; technical delays meant that spend was incurred later than expected. This was partly due to technical complexity which is inherent in some of the pioneering AI and automation work that the programme is delivering.","wholeLifeCost":429.95,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 increased from £362m to £431.78m. This is primarily due to an increase in programme scope for 25/26.","benefits":13059.47,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 increased from £2,748m to £13,153.14m. This is primarily due to the increase in programme scope for 25/26 to include Appeals-related projects; which brought a significant benefit. The Asylum Transformation Programme (ATP) has already delivered significant improvements in the UK asylum system; totalling over £1bn in benefits up to the end of 25/26.","themes":["Cost & funding","Delivery & schedule","Technical & integration","Scope & requirements"],"evidenceExcerpt":"Compared with Q4 2024/25, the NISTA Delivery Confidence Assessment (DCA) rating for Q4 2025/26 remains Amber. This reflects continued delivery progress alongside a number of ongoing risks and dependencies. The programme has maintained good momentum across multiple projects, with progress against its strategic objectives continuing. However, challenges…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same: 31st March 2027. This reflects the successful delivery to date and the confidence in future plans.","narrativeClaimKind":null}],"previous":{"id":"HO_0183_2223-Q3","year":2025,"name":"ASYLUM TRANSFORMATION PROGRAMME","department":"HO","category":"Government Transformation and Service Delivery","description":"The Asylum Transformation Programme is transforming people capabilities, process and technology underpinning asylum casework and asylum support and accommodation, to create a flexible, sustainable and efficient system which has a transparent and outcome focussed customer journey, enabling strong partner and public trust and an improved colleague experience.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ 1) Ongoing successful delivery against the strategic objectives including the successful design and pilot of AI tools to support caseworking, the delivery and implementation of an asylum support discontinuation and move on function, and the increase in occupancy of Dispersed Accommodation. 2) The acknowledgement that the programme continued to face challenges outside of it's control, including resource shortages of enabling functions due to competing priorities within the Home Office.","startDate":"2022-09-01","endDate":"2027-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/12/2026 to 31/03/2027. This is primarily due to the following factors‚ 1) Delivery of existing scope at a slower pace than anticipated due to resource restrictions of enabling resources. 2) A significant extension of the programme scope to cover additional projects as a result of the closure of another programme, as well as an increase scope to align with the new Government priorities.","fyBaseline":88.5,"fyForecast":40.1,"fyVariance":54.69,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ Delivery at a slower pace than anticipated due to resource restrictions.","wholeLifeCost":362.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 441 to 362. This is primarily due to the following factors‚ A change in programme scope from the FY23/24 to the FY 24/25, to see the removal of obtaining Dispersed Accommodation, and moved into Business as Usual.","benefits":2748.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) decreased from 18143 to 2748. This is primarily due to the following factors‚ A change in programme scope from the FY23/24 to the FY 24/25, to see the removal of obtaining Dispersed Accommodation, and moved into Business as Usual.","themes":["Delivery & schedule","Cost & funding","Scope & requirements","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ 1) Ongoing successful delivery against the strategic objectives including the successful design and pilot of AI tools to support caseworking, the delivery and…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/12/2026 to 31/03/2027. This is primarily due to the following factors‚ 1) Delivery of existing scope at a slower pace than anticipated due to resource restrictions of enabling resources. 2) A significant extension of the programme scope to cover additional projects as a result of the closure of another programme, as well as an increase scope to align with the new Government priorities.","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":null,"attentionScore":23,"attentionReasons":["Current published delivery confidence is Amber","In-year forecast variance is +16.1%"]},{"id":"DBT_0293_2324-Q3","year":2026,"name":"POST OFFICE - TRANSFORMATION","department":"DBT","category":"Information and Communications Technology (ICT)","description":"Post Office Transformation Programme, a five-year programme to secure the network’s long-term future by modernising technology, strengthening the commercial offer, reshaping the operating model, and improving Postmaster and stakeholder relationships while maintaining financial stability. POL’s five-year Transformation Plan is split into: STP 4 pillars – Commercial Offer, Network, Operating Model, Stakeholder Relations. FTP 5th pillar - Technology & Data.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 has improved to Amber from Red representing the material progress made in establishing the programme and its underlying control infrastructure.","startDate":"2025-04-01","endDate":null,"scheduleNarrative":"We remain on track with the 5 year overall programme and core outcomes expected from it.","fyBaseline":267.53,"fyForecast":226.56,"fyVariance":15.31,"varianceNarrative":"Budget variance includes proactive review and return of under utilised funding in line with monthly dialogue with DBT.","wholeLifeCost":1553.73,"costNarrative":"WLC in line with business case.","benefits":null,"benefitsNarrative":"Benefits and outcomes remain in line with overall business case.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 has improved to Amber from Red representing the material progress made in establishing the programme and its underlying control infrastructure. We remain on track with the 5 year overall programme and core outcomes expected from it.","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"We remain on track with the 5 year overall programme and core outcomes expected from it.","narrativeClaimKind":null,"history":[{"id":"DBT_0293_2324-Q3","year":2025,"name":"POST OFFICE - NEW IT SYSTEM","department":"DBT","category":"ICT","description":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","startDate":null,"endDate":null,"scheduleNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","wholeLifeCost":null,"costNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","benefits":null,"benefitsNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","narrativeClaimKind":null},{"id":"DBT_0293_2324-Q3","year":2026,"name":"POST OFFICE - TRANSFORMATION","department":"DBT","category":"Information and Communications Technology (ICT)","description":"Post Office Transformation Programme, a five-year programme to secure the network’s long-term future by modernising technology, strengthening the commercial offer, reshaping the operating model, and improving Postmaster and stakeholder relationships while maintaining financial stability. POL’s five-year Transformation Plan is split into: STP 4 pillars – Commercial Offer, Network, Operating Model, Stakeholder Relations. FTP 5th pillar - Technology & Data.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 has improved to Amber from Red representing the material progress made in establishing the programme and its underlying control infrastructure.","startDate":"2025-04-01","endDate":null,"scheduleNarrative":"We remain on track with the 5 year overall programme and core outcomes expected from it.","fyBaseline":267.53,"fyForecast":226.56,"fyVariance":15.31,"varianceNarrative":"Budget variance includes proactive review and return of under utilised funding in line with monthly dialogue with DBT.","wholeLifeCost":1553.73,"costNarrative":"WLC in line with business case.","benefits":null,"benefitsNarrative":"Benefits and outcomes remain in line with overall business case.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 has improved to Amber from Red representing the material progress made in establishing the programme and its underlying control infrastructure. We remain on track with the 5 year overall programme and core outcomes expected from it.","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"We remain on track with the 5 year overall programme and core outcomes expected from it.","narrativeClaimKind":null}],"previous":{"id":"DBT_0293_2324-Q3","year":2025,"name":"POST OFFICE - NEW IT SYSTEM","department":"DBT","category":"ICT","description":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","startDate":null,"endDate":null,"scheduleNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","wholeLifeCost":null,"costNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","benefits":null,"benefitsNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","narrativeClaimKind":null},"ratingDelta":null,"transition":"Not comparable","endDateDeltaDays":null,"attentionScore":23,"attentionReasons":["Current published delivery confidence is Amber","In-year forecast variance is +15.3%"]},{"id":"BEIS_0009_2021-Q3","year":2026,"name":"SIXEP CONTINUITY PLANT","department":"DESNZ","category":"Infrastructure and Construction","description":"The SCP project will design, construct, inactively commission and handover a new radioactive effluent treatment facility, which is a mission critical requirement for Sellafield. Without this facility critical work at Sellafield would cease, most importantly the retrieval of legacy high hazard materials. Through spent nuclear fuel and waste management operations Sellafield site produces liquid effluent which requires treatment to remove radioactivity before discharge into the sea. This capability is currently delivered by the Site Ion Exchange Effluent Plant (SIXEP). The continued availability of effluent treatment via SIXEP is a regulatory compliance requirement and is essential for delivery of the site missions including high hazard and risk reduction activities (HHRR), underpinning the Government’s UK Discharge Strategy and OSPAR commitments. Continued effluent treatment through SIXEP (or SCP when available) is fundamental to the NDA Mission to “deliver safe, sustainable and publicly acceptable solutions to the challenge of nuclear clean-up and waste management.”","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at GREEN. This is primarily due to the following factors: The Project is currently in the execution stage, being delivered by the Programme and Project Partnership (PPP,) and is showing no significant threat to the overall P80 schedule which was also supported by the annual NISTA Gate 0 review undertaken in July 2025 which gave a GREEN Delivery Confidence Assessment, noting that delivery of the project “within the P80 schedule was assessed as highly likely.\"","startDate":"2013-05-25","endDate":"2031-10-21","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 has increased from 23-Jan-2031 to 21-Oct-2031. This is primarily due to the following factor: Change in legislation relating to Passive Fire Protection Standards; the new requirements are more onerous than the original design specification. Due to the required design updates a number of critical path scope packages have been impacted and subsequently the project completion date has been delayed, which remains within the P80 schedule.","fyBaseline":114.77,"fyForecast":142.13,"fyVariance":23.84,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The project has experienced cost increases across several packages, beyond original assumptions. This has been further compounded by the impact, and constraints, of industrial action. A number of contractual adjustment events are in flight for which the project has captured/incurred costs. Until these are agreed, and associated baseline is implemented, a variance will remain between departmental baseline and Forecast/cost.","wholeLifeCost":1097.5,"costNarrative":"The increase to the project's departmentally agreed Whole Life Cost at 25/26-Q4 is primarily due to: Annual Indexation, in line with the agreed indices, and the impact of the agreed contractual adjustment event for Passive Fire Protection legislative change.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained 0. This is primarily due to the following factors: There are no monetised benefits within the SCP project however, it will provide key capabilities which in enables the following benefits: • Allows the Site Licence owner to meet its requirements in the regulatory permit. • Provides effluent abatement to 2060 in support of site missions. • Provides an opportunity to deploy an Alternative Ion Exchange (IX) media that improves abatement performance, following the consideration of best available technique (BAT). • Maintaining unconstrained Site Ion Exchange Effluent Plant (SIXEP) waste material storage capacity.","themes":["Delivery & schedule","Cost & funding","Scope & requirements","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at GREEN. This is primarily due to the following factors: The Project is currently in the execution stage, being delivered by the Programme and Project Partnership (PPP,) and is showing no significant threat to the overall P80 schedule which…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 has increased from 23-Jan-2031 to 21-Oct-2031. This is primarily due to the following factor: Change in legislation relating to Passive Fire Protection Standards; the new requirements are more onerous than the original design specification. Due to the required design updates a number of critical path scope packages have been impacted and subsequently the project completion date has been delayed, which remains within the P80 schedule.","narrativeClaimKind":null,"history":[{"id":"BEIS_0009_2021-Q3","year":2021,"name":"SIXEP Continuity Plant","department":"BEIS","category":"Infrastructure and Construction","description":"SIXEP Continuity Plant will replace the existing effluent treatment plant at Sellafield as it approaches end of life and will provide interim waste storage capability. It is a key enabler for the safe and reliable retrieval and treatment of legacy waste at Sellafield, in support of government and Nuclear Decommissioning Authority strategic objectives.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber/red.This is primarily due to the following factors: This is a complex nuclear project on an operational nuclear site. The project is undergoing a structured assurance to support the Full Business Case and will come forward for sanction in Q3 2021. It is important that the project identifies the level of technical maturity and supply chain capability and capacity it will carry beyond this gate. Additionally, robust asset management of existing facilities associated with the site effluent infrastructure will need to be demonstrated for the project and wider programme benefits to be realised. The newly established Programme and Project Partnership is being used to deliver this project and its success is critical. Finally, the project has been affected by Covid-19, with significant efforts ongoing to minimise impact on overall cost and schedule. It is also worth noting that this project replaces the current effluent treatment facility and is mission critical to the future safe operation of the site.","startDate":"2013-05-25","endDate":"2027-12-20","scheduleNarrative":"The project end-date is 20 December 2027. This is primarily due to the following factors: This is a complex nuclear project and its delivery has been affected by Covid-19. The forecast Project lifecycle end date is within the date range sited in the Outline Business Case but has been impcated by Covid-19 and specifically relates to delays in development of a specialist valve prototype. Development of the valve could take longer than anticipated leading to delays in delivery of the SIXEP Continuity Plant capability. Due to the location of Sellafield getting suppliers from other parts of the country, the ability to get people onto site safely from a worker density viewpoint and the adjacent on-going nuclear operational activities make achieving normal productivity levels impossible. The Sellafield Executive have maximised the position given the circumstances and constraints.","fyBaseline":38.49,"fyForecast":45.54,"fyVariance":18.0,"varianceNarrative":"The budget variance exceeds 5%. The forecast spend for 2020/21 is �45M, 18% higher than the profile in the Outline Business Case. This is due to the acceleration of construction work in 2019/20 and 2020/21 against the baseline. While the project is forecasting to be ahead of the baseline at year end this does not reflect the true impact of Covid-19, which has slowed delivery in year and led to some cost inefficiencies.","wholeLifeCost":589.91,"costNarrative":"The projects Baseline Whole Life Cost is �589.91m. This is primarily due to the following factors: The bulk of the information in this submission is based around the Outline Business Case approved in 2020. The project is progressing towards Full Business Case approval in Q3 2021 after which the information will be updated. The approved cost range is �574m to �1,050m (not taking account of Covid-19 impact). The project forecast is at the upper end of this range. The Reference Class Forecasting model is likely to exceed the Outline Business Case upper range when Covid-19 impact is included. A full impact assessment of Covid-19 will be included in the Full Business Case submission.","benefits":null,"benefitsNarrative":"","themes":["Approvals & decisions","Cost & funding","Delivery & schedule","Workforce & capability"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber/red.This is primarily due to the following factors: This is a complex nuclear project on an operational nuclear site. The project is undergoing a structured assurance to support the Full Business Case and will come forward for sanction in Q3 2021. It is important that the…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project end-date is 20 December 2027. This is primarily due to the following factors: This is a complex nuclear project and its delivery has been affected by Covid-19. The forecast Project lifecycle end date is within the date range sited in the Outline Business Case but has been impcated by Covid-19 and specifically relates to delays in development of a specialist valve prototype. Development of the valve could take longer than anticipated leading to delays in delivery of the SIXEP Continuity Plant capability. Due to the location of Sellafield getting suppliers from other parts of the country, the ability to get people onto site safely from a worker density viewpoint and the adjacent on-going nuclear operational activities make achieving normal productivity levels impossible. The Sellafield Executive have maximised the position given the circumstances and constraints.","narrativeClaimKind":null},{"id":"BEIS_0009_2021-Q3","year":2022,"name":"SIXEP Continuity Plant","department":"BEIS","category":"Infrastructure and Construction","description":"SIXEP Continuity Plant will replace the existing effluent treatment plant at Sellafield as it approaches end of life and will provide interim waste storage capability. It is a key enabler for the safe and reliable retrieval and treatment of legacy waste at Sellafield, in support of government and Nuclear Decommissioning Authority strategic objectives.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 decreased from Amber/red to Amber This is a complex nuclear project on an operational nuclear site. The Full Business Case was approved by government in December 2021 and is in execution with manufacturing and construction activities ongoing. The first major project milestone is on track for July 2022 and the project end date remains stable. More broadly, robust asset management of existing facilities associated with the site effluent infrastructure will need to be ensured for the project and wider programme benefits to be realised. The newly established Programme and Project Partnership is being used to deliver this project and its success is critical. It is also worth noting that this project replaces the current effluent treatment facility and is mission critical to the future safe operation of the site.","startDate":"2013-05-25","endDate":"2031-01-23","scheduleNarrative":"Compared to 2021-Q4, your project end-date increased from 20 DEC 2027 to 23 JAN 2031 . This is primarily due to the following factors: The Full Business Case (FBC) has been approved by HMT, and the Programme and Project Partners (PPP) Major Project Baseline has been set with the project completion date May 2030 with a ICP50 date of January 2031, inclusive of COVID impact to June 2021. The Project remains on schedule and is forecast to deliver within the FBC IC P50 dates.","fyBaseline":93.93,"fyForecast":84.44,"fyVariance":-11.0,"varianceNarrative":"The spend for 2021/22 of £84.44m is 11% lower than the planned scope of £93.93m. The in-year delta comprises (i) deferral of some project specific procurement packages to align with long-term strategic procurements; and (ii) cost savings in the areas of site logistics and resourcing.","wholeLifeCost":960.0,"costNarrative":"Compared to2021-Q4, the projects Baseline Whole Life Cost increased from 589.91 (£m) to 959.62 (£m). This is primarily due to the following factors: The Full Business Case (FBC) has been approved by HMT, and the Programme and Project Partners (PPP) Major Project Baseline have been set with the project completion date May 2030 with a P50 date of January 2031, inclusive of COVID impact to June 2021. The lifecycle cost has increased to £1.007bn (@P50 incl. Covid-19 up to June 2021), £1.182bn (@P80 incl. Covid-19 beyond June 2021) and £1.25bn with Reference Class Forecasting/ Optimum Bias and COVID impacts up to June 20/21. All numbers are inflated as per FBC. The current baseline figures are reported at FBC, inclusive of Aligned Incentive Fund (AIF) and Intelligent Client (IC) P50.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 decreased from Amber/red to Amber This is a complex nuclear project on an operational nuclear site. The Full Business Case was approved by government in December 2021 and is in execution with manufacturing and construction activities…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to 2021-Q4, your project end-date increased from 20 DEC 2027 to 23 JAN 2031 . This is primarily due to the following factors: The Full Business Case (FBC) has been approved by HMT, and the Programme and Project Partners (PPP) Major Project Baseline has been set with the project completion date May 2030 with a ICP50 date of January 2031, inclusive of COVID impact to June 2021. The Project remains on schedule and is forecast to deliver within the FBC IC P50 dates.","narrativeClaimKind":null},{"id":"BEIS_0009_2021-Q3","year":2023,"name":"SIXEP Continuity Plant","department":"DESNZ","category":"Infrastructure and Construction","description":"SIXEP Continuity Plant (SCP) is required to deliver a continued site effluent capability in support of high hazard reduction projects and the overall NDA mission. It is a key enabler for the safe and reliable retrieval and treatment of legacy waste at Sellafield, in support of government and Nuclear Decommissioning Authority strategic objectives.","ipaDca":"Green","sroDca":null,"deliveryConfidence":"Green","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 increased from Amber to Green. This is primarily due to the following factors. This is a complex nuclear project on an operational nuclear site. The Project is in the execution stage with manufacturing and construction activities ongoing. The SCP project is being delivered by the Programme and Project Partnership (PPP). The IPA afforded this project a RAG rating of GREEN.","startDate":"2013-05-25","endDate":"2031-01-23","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2031-01-23. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2031-01-23. This is primarily due to the following factors. The Project remains on schedule and there is no change to the date of 23 January 2031.","fyBaseline":198.82,"fyForecast":114.02,"fyVariance":-43.0,"varianceNarrative":"The in year spend is less than the budget for 2022/23 due to realignment to PPP Multi Project Procurements and the Category Management approach. This shows that the project is not spending money ahead of demand, does not affect the overall spend position for the project and better aligns key procurements to the current construction delivery strategy. The decision maintains the equipment required on site dates and minimises interim storage costs for plant and equipment.","wholeLifeCost":1034.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 increased from 960m. to 1034m. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 increased from 960m. to 1034m. This is primarily due to the following factors. Compared to 21/22-Q4, the SCP budgeted cost (baseline) has increased by 74.25m, this is due to escalation in line with the agreed indices.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. The project did not provide departmental-agree monetised benefits at 22/23-Q4. There are no monetised benefits within the SCP project however, it will provide key capabilities which in enables the following benefits: Allows the Site Licence owner to meet its requirements in the regulatory permit. Provides effluent abatement to 2060 in support of site missions. Provides an opportunity to deploy an Alternative Ion Exchange (IX) media that improves abatement performance, following the consideration of best available technique (BAT). Maintaining unconstrained Site Ion Exchange Effluent Plant (SIXEP) waste material storage capacity.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 increased from Amber to Green. This is primarily due to the following factors. This is a complex nuclear project on an operational nuclear site. The Project is in the execution stage with manufacturing and construction activities…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2031-01-23. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2031-01-23. This is primarily due to the following factors. The Project remains on schedule and there is no change to the date of 23 January 2031.","narrativeClaimKind":null},{"id":"BEIS_0009_2021-Q3","year":2024,"name":"SIXEP Continuity Plant","department":"DESNZ","category":"Infrastructure and Construction","description":"SIXEP Continuity Plant (SCP) is required to deliver a continued site effluent capability in support of high hazard reduction projects and the overall NDA mission. It is a key enabler for the safe and reliable retrieval and treatment of legacy waste at Sellafield, in support of government and Nuclear Decommissioning Authority strategic objectives.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 22/23-Q4, the Delivery Confidence Assessment rating at 23/24-Q4 remained at Green(SRO rating). This is primarily due to the following factors. This is a complex nuclear project on an operational nuclear site. The Project is in the execution stage with manufacturing and construction activities ongoing. The SCP project is being delivered by the Programme and Project Partnership (PPP). The IPA afforded this project a RAG rating of GREEN.","startDate":"2013-05-25","endDate":"2031-01-23","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2031-01-23. This is primarily due to the following factors. The Project remains on schedule and there is no change to the date of 23 January 2031.","fyBaseline":142.16,"fyForecast":163.45,"fyVariance":15.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The in year spend is greater than the budget (baseline) for 2023/24 due to realignment to PPP Multi Project Procurements and the Category Management approach. The project is showing recovery against the cumulative baseline position. This does not affect the overall spend position for the project and better aligns key procurements to the current construction delivery strategy. The decision maintains the equipment 'required on site dates'.","wholeLifeCost":1076.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 increased from 1034m. to 1076m. This is primarily due to the following factors. The SCP budgeted cost (baseline) has increased by 42m, this is due to escalation in line with the agreed indices.","benefits":0.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 0m. There are no monetised benefits within the SCP project however, it will provide key capabilities which in enables the following benefits: . Allows the Site Licence owner to meet its requirements in the regulatory permit. . Provides effluent abatement to 2060 in support of site missions. . Provides an opportunity to deploy an Alternative Ion Exchange (IX) media that improves abatement performance, following the consideration of best available technique (BAT). . Maintaining unconstrained Site Ion Exchange Effluent Plant (SIXEP) waste material storage capacity.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Delivery Confidence Assessment rating at 23/24-Q4 remained at Green(SRO rating). This is primarily due to the following factors. This is a complex nuclear project on an operational nuclear site. The Project is in the execution stage with manufacturing and construction activities ongoing. The SCP project is being…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2031-01-23. This is primarily due to the following factors. The Project remains on schedule and there is no change to the date of 23 January 2031.","narrativeClaimKind":null},{"id":"BEIS_0009_2021-Q3","year":2025,"name":"SIXEP CONTINUITY PLANT","department":"DESNZ","category":"Infrastructure and Construction","description":"SIXEP Continuity Plant (SCP) is required to deliver a continued site effluent capability in support of high hazard reduction projects and the overall NDA mission.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at GREEN. This is primarily due to the following factors‚ This is a complex nuclear project on an operational nuclear site. The Project is in the execution stage and continues to transition from bulk civil construction to mechanical and electrical fit out and is currently showing no significant threat to the overall P80 schedule. The SCP project is being delivered by the Programme and Project Partnership (PPP). The IPA afforded this project a RAG rating of GREEN.","startDate":"2013-05-25","endDate":"2031-01-23","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 23/01/2031. This is primarily due to the following factors‚ The Project remains on schedule and there is no change to the date of 23/01/2031.","fyBaseline":126.75,"fyForecast":161.83,"fyVariance":27.68,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The in year spend is greater than the budget (baseline) for 2023/24 due to realignment to PPP Multi Project Procurements and the Category Management approach. The project is showing recovery against the cumulative baseline position. This does not affect the overall spend position for the project and better aligns key procurements to the current construction delivery strategy.","wholeLifeCost":1092.97,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 1076 to 1092. This is primarily due to the following factors‚ Compared to 23/24-Q4, the SCP budgeted cost (baseline) has increased by £16m, this is due to escalation in line with the agreed indices.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ There are no monetised benefits within the SCP project however, it will provide key capabilities which in enables the following benefits: • Allows the Site Licence owner to meet its requirements in the regulatory permit. • Provides effluent abatement to 2060 in support of site missions. • Provides an opportunity to deploy an Alternative Ion Exchange (IX) media that improves abatement performance, following the consideration of best available technique (BAT). • Maintaining unconstrained Site Ion Exchange Effluent Plant (SIXEP) waste material storage capacity.","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at GREEN. This is primarily due to the following factors‚ This is a complex nuclear project on an operational nuclear site. The Project is in the execution stage and continues to transition from bulk civil construction to…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 23/01/2031. This is primarily due to the following factors‚ The Project remains on schedule and there is no change to the date of 23/01/2031.","narrativeClaimKind":null},{"id":"BEIS_0009_2021-Q3","year":2026,"name":"SIXEP CONTINUITY PLANT","department":"DESNZ","category":"Infrastructure and Construction","description":"The SCP project will design, construct, inactively commission and handover a new radioactive effluent treatment facility, which is a mission critical requirement for Sellafield. Without this facility critical work at Sellafield would cease, most importantly the retrieval of legacy high hazard materials. Through spent nuclear fuel and waste management operations Sellafield site produces liquid effluent which requires treatment to remove radioactivity before discharge into the sea. This capability is currently delivered by the Site Ion Exchange Effluent Plant (SIXEP). The continued availability of effluent treatment via SIXEP is a regulatory compliance requirement and is essential for delivery of the site missions including high hazard and risk reduction activities (HHRR), underpinning the Government’s UK Discharge Strategy and OSPAR commitments. Continued effluent treatment through SIXEP (or SCP when available) is fundamental to the NDA Mission to “deliver safe, sustainable and publicly acceptable solutions to the challenge of nuclear clean-up and waste management.”","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at GREEN. This is primarily due to the following factors: The Project is currently in the execution stage, being delivered by the Programme and Project Partnership (PPP,) and is showing no significant threat to the overall P80 schedule which was also supported by the annual NISTA Gate 0 review undertaken in July 2025 which gave a GREEN Delivery Confidence Assessment, noting that delivery of the project “within the P80 schedule was assessed as highly likely.\"","startDate":"2013-05-25","endDate":"2031-10-21","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 has increased from 23-Jan-2031 to 21-Oct-2031. This is primarily due to the following factor: Change in legislation relating to Passive Fire Protection Standards; the new requirements are more onerous than the original design specification. Due to the required design updates a number of critical path scope packages have been impacted and subsequently the project completion date has been delayed, which remains within the P80 schedule.","fyBaseline":114.77,"fyForecast":142.13,"fyVariance":23.84,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The project has experienced cost increases across several packages, beyond original assumptions. This has been further compounded by the impact, and constraints, of industrial action. A number of contractual adjustment events are in flight for which the project has captured/incurred costs. Until these are agreed, and associated baseline is implemented, a variance will remain between departmental baseline and Forecast/cost.","wholeLifeCost":1097.5,"costNarrative":"The increase to the project's departmentally agreed Whole Life Cost at 25/26-Q4 is primarily due to: Annual Indexation, in line with the agreed indices, and the impact of the agreed contractual adjustment event for Passive Fire Protection legislative change.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained 0. This is primarily due to the following factors: There are no monetised benefits within the SCP project however, it will provide key capabilities which in enables the following benefits: • Allows the Site Licence owner to meet its requirements in the regulatory permit. • Provides effluent abatement to 2060 in support of site missions. • Provides an opportunity to deploy an Alternative Ion Exchange (IX) media that improves abatement performance, following the consideration of best available technique (BAT). • Maintaining unconstrained Site Ion Exchange Effluent Plant (SIXEP) waste material storage capacity.","themes":["Delivery & schedule","Cost & funding","Scope & requirements","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at GREEN. This is primarily due to the following factors: The Project is currently in the execution stage, being delivered by the Programme and Project Partnership (PPP,) and is showing no significant threat to the overall P80 schedule which…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 has increased from 23-Jan-2031 to 21-Oct-2031. This is primarily due to the following factor: Change in legislation relating to Passive Fire Protection Standards; the new requirements are more onerous than the original design specification. Due to the required design updates a number of critical path scope packages have been impacted and subsequently the project completion date has been delayed, which remains within the P80 schedule.","narrativeClaimKind":null}],"previous":{"id":"BEIS_0009_2021-Q3","year":2025,"name":"SIXEP CONTINUITY PLANT","department":"DESNZ","category":"Infrastructure and Construction","description":"SIXEP Continuity Plant (SCP) is required to deliver a continued site effluent capability in support of high hazard reduction projects and the overall NDA mission.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at GREEN. This is primarily due to the following factors‚ This is a complex nuclear project on an operational nuclear site. The Project is in the execution stage and continues to transition from bulk civil construction to mechanical and electrical fit out and is currently showing no significant threat to the overall P80 schedule. The SCP project is being delivered by the Programme and Project Partnership (PPP). The IPA afforded this project a RAG rating of GREEN.","startDate":"2013-05-25","endDate":"2031-01-23","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 23/01/2031. This is primarily due to the following factors‚ The Project remains on schedule and there is no change to the date of 23/01/2031.","fyBaseline":126.75,"fyForecast":161.83,"fyVariance":27.68,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The in year spend is greater than the budget (baseline) for 2023/24 due to realignment to PPP Multi Project Procurements and the Category Management approach. The project is showing recovery against the cumulative baseline position. This does not affect the overall spend position for the project and better aligns key procurements to the current construction delivery strategy.","wholeLifeCost":1092.97,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 1076 to 1092. This is primarily due to the following factors‚ Compared to 23/24-Q4, the SCP budgeted cost (baseline) has increased by £16m, this is due to escalation in line with the agreed indices.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ There are no monetised benefits within the SCP project however, it will provide key capabilities which in enables the following benefits: • Allows the Site Licence owner to meet its requirements in the regulatory permit. • Provides effluent abatement to 2060 in support of site missions. • Provides an opportunity to deploy an Alternative Ion Exchange (IX) media that improves abatement performance, following the consideration of best available technique (BAT). • Maintaining unconstrained Site Ion Exchange Effluent Plant (SIXEP) waste material storage capacity.","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at GREEN. This is primarily due to the following factors‚ This is a complex nuclear project on an operational nuclear site. The Project is in the execution stage and continues to transition from bulk civil construction to…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 23/01/2031. This is primarily due to the following factors‚ The Project remains on schedule and there is no change to the date of 23/01/2031.","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":271,"attentionScore":23,"attentionReasons":["Published end date moved 271 days later","In-year forecast variance is +23.8%"]},{"id":"HMRC_0544_2526-Q2","year":2026,"name":"Contact Centre as a Service (CCaaS)","department":"HMRC","category":"Government Transformation and Service Delivery","description":"Contact Centre as a Service (CCaaS) is a programme to modernise HMRC’s contact centre technology. It will replace ageing systems with a secure, cloud‑based platform that makes it easier for customers to contact HMRC and for advisors to provide a better, more efficient service. CCaaS will improve call handling, digital contact options and service resilience, helping HMRC respond more effectively to customer demand while supporting future service improvements.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Contact Centre as a Service programme is rated Amber as it moves into mobilisation and discovery following supplier approval. The rating reflects known delivery risks, including maintaining service continuity during transition from legacy systems; ensuring sufficient delivery and integration capacity; achieving business readiness and adoption across operational teams; and dependency on timely deployment to realise benefits. These risks are understood and are being actively managed through phased delivery, strengthened business readiness activity, clear accountabilities, and ongoing governance and assurance. Delivery is being actively managed to maintain control of cost, scope and delivery assumptions, while strengthening capability and business readiness to support successful implementation and adoption. Ongoing assurance and governance arrangements are in place, with actions tracked to completion, providing confidence that the programme remains deliverable and that benefits will be realised as planned.","startDate":"2025-04-01","endDate":"2027-10-29","scheduleNarrative":"The schedule reflects the completion of procurement activity in line with plan and a continued focus on ensuring a safe and controlled transition from existing contact centre systems. The schedule continues to balance pace with service continuity, allowing sufficient time for implementation, testing and business readiness activities to minimise the risk of disruption to live services.","fyBaseline":6.33,"fyForecast":5.64,"fyVariance":10.87,"varianceNarrative":"The budget variance exceeds 5% and reflects the transition from early, high-level estimates to a more mature and assumption-led forecast. As delivery plans and commercial positions have developed, previously indicative budget assumptions have been revisited, with greater clarity on scope, profiling and cost drivers. As a result, the current forecast provides a more realistic and evidence-based view of expected spend, with variance mainly driven by improved definition and the reclassification of uncertain elements rather than a change in overall delivery ambition.","wholeLifeCost":571.86,"costNarrative":"The programme continues to deliver within its approved funding envelope. This reflects cost estimates that are consistent with the approved business case and the programme’s current stage, with costs being closely managed as the programme moves from procurement into delivery.","benefits":237.99,"benefitsNarrative":"The programme has defined its expected benefits, and is expected to improve service resilience, customer experience and operational efficiency and is taking action to ensure it is affordable, delivers value for money and is achievable. The programme is establishing clear, measurable benefits with accountable owners, alongside baselining current performance to enable robust tracking of benefits realisation. Full monetisation of benefits will be completed following supplier selection and finalisation of the detailed design and operating model, when implementation choices and delivery profiles are confirmed.","themes":["Delivery & schedule","Cost & funding","Commercial & supply chain","Governance & assurance"],"evidenceExcerpt":"The Contact Centre as a Service programme is rated Amber as it moves into mobilisation and discovery following supplier approval. The rating reflects known delivery risks, including maintaining service continuity during transition from legacy systems; ensuring sufficient delivery and integration capacity; achieving business readiness and adoption across…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The schedule reflects the completion of procurement activity in line with plan and a continued focus on ensuring a safe and controlled transition from existing contact centre systems. The schedule continues to balance pace with service continuity, allowing sufficient time for implementation, testing and business readiness activities to minimise the risk of disruption to live services.","narrativeClaimKind":null,"history":[{"id":"HMRC_0544_2526-Q2","year":2026,"name":"Contact Centre as a Service (CCaaS)","department":"HMRC","category":"Government Transformation and Service Delivery","description":"Contact Centre as a Service (CCaaS) is a programme to modernise HMRC’s contact centre technology. It will replace ageing systems with a secure, cloud‑based platform that makes it easier for customers to contact HMRC and for advisors to provide a better, more efficient service. CCaaS will improve call handling, digital contact options and service resilience, helping HMRC respond more effectively to customer demand while supporting future service improvements.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Contact Centre as a Service programme is rated Amber as it moves into mobilisation and discovery following supplier approval. The rating reflects known delivery risks, including maintaining service continuity during transition from legacy systems; ensuring sufficient delivery and integration capacity; achieving business readiness and adoption across operational teams; and dependency on timely deployment to realise benefits. These risks are understood and are being actively managed through phased delivery, strengthened business readiness activity, clear accountabilities, and ongoing governance and assurance. Delivery is being actively managed to maintain control of cost, scope and delivery assumptions, while strengthening capability and business readiness to support successful implementation and adoption. Ongoing assurance and governance arrangements are in place, with actions tracked to completion, providing confidence that the programme remains deliverable and that benefits will be realised as planned.","startDate":"2025-04-01","endDate":"2027-10-29","scheduleNarrative":"The schedule reflects the completion of procurement activity in line with plan and a continued focus on ensuring a safe and controlled transition from existing contact centre systems. The schedule continues to balance pace with service continuity, allowing sufficient time for implementation, testing and business readiness activities to minimise the risk of disruption to live services.","fyBaseline":6.33,"fyForecast":5.64,"fyVariance":10.87,"varianceNarrative":"The budget variance exceeds 5% and reflects the transition from early, high-level estimates to a more mature and assumption-led forecast. As delivery plans and commercial positions have developed, previously indicative budget assumptions have been revisited, with greater clarity on scope, profiling and cost drivers. As a result, the current forecast provides a more realistic and evidence-based view of expected spend, with variance mainly driven by improved definition and the reclassification of uncertain elements rather than a change in overall delivery ambition.","wholeLifeCost":571.86,"costNarrative":"The programme continues to deliver within its approved funding envelope. This reflects cost estimates that are consistent with the approved business case and the programme’s current stage, with costs being closely managed as the programme moves from procurement into delivery.","benefits":237.99,"benefitsNarrative":"The programme has defined its expected benefits, and is expected to improve service resilience, customer experience and operational efficiency and is taking action to ensure it is affordable, delivers value for money and is achievable. The programme is establishing clear, measurable benefits with accountable owners, alongside baselining current performance to enable robust tracking of benefits realisation. Full monetisation of benefits will be completed following supplier selection and finalisation of the detailed design and operating model, when implementation choices and delivery profiles are confirmed.","themes":["Delivery & schedule","Cost & funding","Commercial & supply chain","Governance & assurance"],"evidenceExcerpt":"The Contact Centre as a Service programme is rated Amber as it moves into mobilisation and discovery following supplier approval. The rating reflects known delivery risks, including maintaining service continuity during transition from legacy systems; ensuring sufficient delivery and integration capacity; achieving business readiness and adoption across…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The schedule reflects the completion of procurement activity in line with plan and a continued focus on ensuring a safe and controlled transition from existing contact centre systems. The schedule continues to balance pace with service continuity, allowing sufficient time for implementation, testing and business readiness activities to minimise the risk of disruption to live services.","narrativeClaimKind":null}],"previous":null,"ratingDelta":null,"transition":"Not comparable","endDateDeltaDays":null,"attentionScore":22,"attentionReasons":["Current published delivery confidence is Amber","In-year forecast variance is +10.9%"]},{"id":"MOJ_0050_2122-Q3","year":2026,"name":"Evolve: WAN/LAN (Networks)","department":"MOJ","category":"Information and Communications Technology (ICT)","description":"Re-procurement of WAN and LAN Services suitable for the current and future needs of the MoJ. The project includes requirements gathering, procurement preparation and competitive procurement followed by the transition of services and exit of the existing contracts.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25-Q4, the Delivery Confidence Assessment (DCA) rating at 25/26-Q4 has increased to Green. This is primarily due to increased time contingency within plans, and significant activities being either complete or in progress in line with project plans.","startDate":"2021-09-27","endDate":"2028-12-15","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end date at 25/26-Q4 changed from 16/08/28 to 15/12/28. This is primarily due to revision of planned activity timelines to increase contingency based on insights from lessons learned.","fyBaseline":31.48,"fyForecast":6.67,"fyVariance":78.81,"varianceNarrative":"The budget variance exceeds 5%. The underspend is due to reduced in-year activities, requiring costs to be re-profiled into future years.","wholeLifeCost":253.89,"costNarrative":"Compared to financial year 24/25-Q4, the project's Whole Life Costs at 25/26-Q4 has increased from £253.20m to £253.89. This is primarily due to delays resulting in cost increases. All costs have been reported in 2024/25 base prices in line with NISTA requirements. This is a change from previous years where costs were reported in nominal prices. All costs reflect this accounting reduction regardless of any actual changes.","benefits":107.62,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's monetised benefits at 25/26-Q4 have increased from £0 to £107.62m. This is primarily due to the following factors‚ confirmation of monetisation of benefits following approval of Full Business Case. All costs have been reported in 2024/25 base prices in line with NISTA requirements. This is a change from previous years where costs were reported in nominal prices. All costs will reflect this accounting reduction regardless of any actual changes.","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 24/25-Q4, the Delivery Confidence Assessment (DCA) rating at 25/26-Q4 has increased to Green. This is primarily due to increased time contingency within plans, and significant activities being either complete or in progress in line with project plans. Compared to financial year 24/25-Q4, the project's end date at 25/26-Q4 changed…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end date at 25/26-Q4 changed from 16/08/28 to 15/12/28. This is primarily due to revision of planned activity timelines to increase contingency based on insights from lessons learned.","narrativeClaimKind":null,"history":[{"id":"MOJ_0050_2122-Q3","year":2022,"name":"Evolve Network Services","department":"MOJ","category":"ICT","description":"Re-procurement of WAN and LAN Services suitable for the current and future needs of the Authority, to replace the existing FITS WAN/LAN contract and comply with Public Procurement regulations. The project includes requirements gathering, ITT / Procurement preparation, competitive procurement followed by the transition of services and exit of the existing contracts.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Senior Responsible Owner Delivery Confidence Assessment rating at 21/22-Q4 is Amber. This is the first time data has been published for this project, which has been added to GMPP over the last year. The DCA is Amber primarily due to the following factors: Delays with the start of procurement for the LAN service.","startDate":"2021-09-27","endDate":"2026-08-30","scheduleNarrative":"Your project end-date is 30 AUG 2026. This is primarily due to the following factors: Project is still expecting to deliver to timescales.","fyBaseline":5.3,"fyForecast":1.53,"fyVariance":-71.0,"varianceNarrative":"The budget variance exceeds 5%. The variance is due to the staff costs being reviewed and found to be significantly lower. There has also been a delay in recruiting staff for the programme","wholeLifeCost":253.0,"costNarrative":"Your projects Baseline Whole Life Cost is 253.20 (£m). This is primarily due to the following factors: RDEL costs include Project costs (TUPE & In Housing Costs, Dual Running. LAN Proof of Concept & Model Office) and BAU running costs CDEL costs include Transition costs from the suppliers.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Workforce & capability","Commercial & supply chain"],"evidenceExcerpt":"The Senior Responsible Owner Delivery Confidence Assessment rating at 21/22-Q4 is Amber. This is the first time data has been published for this project, which has been added to GMPP over the last year. The DCA is Amber primarily due to the following factors: Delays with the start of procurement for the LAN service. Your project end-date is 30 AUG 2026.…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Your project end-date is 30 AUG 2026. This is primarily due to the following factors: Project is still expecting to deliver to timescales.","narrativeClaimKind":null},{"id":"MOJ_0050_2122-Q3","year":2023,"name":"Evolve: WAN/LAN (Networks)","department":"MOJ","category":"ICT","description":"Re-procurement of WAN and LAN Services suitable for the current and future needs of the Authority, to replace the existing Future IT Services WAN/ LAN. The project includes requirements gathering, ITT/Procurement preparation and competitive procurement followed by the transition of services and exit of the existing contracts.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 21/22-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. Compared to 21/22 Q4, the project's Delivery Confidence Assessment rating remained Amber. The Amber assessment is due to procurement timetable risks.","startDate":"2021-09-27","endDate":"2026-08-30","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2026-08-30. This is primarily due to the following factors. The project rebaselined in the financial year to reflect revised timescales.","fyBaseline":28.2,"fyForecast":7.6,"fyVariance":-73.0,"varianceNarrative":"The underspend is driven by commercial activity being rescheduled which has required costs to be re-profiled to future years.","wholeLifeCost":253.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 remained at 253m. This is primarily due to the following factors. The Whole Life Cost has remained static, and the budget remains aligned to the current baseline business case.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This project currently reports no monetised benefits. The project benefits focus on the continued quality of operation of network services contracts.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. Compared to 21/22 Q4, the project's Delivery Confidence Assessment rating remained Amber. The Amber assessment is due to procurement timetable risks. Compared to financial…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2026-08-30. This is primarily due to the following factors. The project rebaselined in the financial year to reflect revised timescales.","narrativeClaimKind":null},{"id":"MOJ_0050_2122-Q3","year":2024,"name":"Evolve: WAN/LAN (Networks)","department":"MOJ","category":"ICT","description":"Re-procurement of WAN and LAN Services suitable for the current and future needs of the Authority, to replace the existing Future IT Services WAN/ LAN. The project includes requirements gathering, Procurement preparation and competitive procurement followed by the transition of services and exit of the existing contracts.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. Timetable risks due to the complexity of multiple procurements.","startDate":"2021-09-27","endDate":"2028-02-24","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 increased from 2026-08-30 to 2028-02-24. This is primarily due to the following factors. The programme has rebaselined its schedule following a change of procurement approach.","fyBaseline":43.5,"fyForecast":13.09,"fyVariance":-70.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The underspend is due to the delay in procurement timelines, which has required costs to be re-profiled to future years","wholeLifeCost":253.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 remained at 253m. This is primarily due to the following factors. The Whole Life Cost has remained static, and the budget remains aligned to the current baseline business case.","benefits":0.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 0m. This project currently reports no monetised benefits. The project's benefits focus on the continued quality of operation of Network Services Contracts","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. Timetable risks due to the complexity of multiple procurements. Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 increased from 2026-08-30 to…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 increased from 2026-08-30 to 2028-02-24. This is primarily due to the following factors. The programme has rebaselined its schedule following a change of procurement approach.","narrativeClaimKind":null},{"id":"MOJ_0050_2122-Q3","year":2025,"name":"Evolve: WAN/LAN (Networks)","department":"MoJ","category":"ICT","description":"Re-procurement of WAN and LAN Services suitable for the current and future needs of the Authority, to replace the existing Future IT Services WAN/ LAN. The project includes requirements gathering, Procurement preparation and competitive procurement followed by the transition of services and exit of the existing contracts.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Timetable risks due to complexity of multiple procurements mobilisations and limited schedule contingency.","startDate":"2021-09-27","endDate":"2028-08-16","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 24/02/2028 to 16/08/2028. This is primarily due to the following factors‚ The schedule was re-baselined due to complexity of multiple procurements mobilisations.","fyBaseline":39.0,"fyForecast":7.5,"fyVariance":80.77,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The underspend is due to reduced in-year activities requiring costs to be re-profiled into future years.","wholeLifeCost":253.2,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 253. This is primarily due to the following factors‚ The Whole Life Cost has remained static, and the budget remains aligned to the current baseline business case.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ This project currently reports no monetised benefits. Confirmation of monetised benefits will be aligned to approval of Full Business Case.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Timetable risks due to complexity of multiple procurements mobilisations and limited schedule contingency. Compared to financial year 23/24-Q4, the project's end-date…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 24/02/2028 to 16/08/2028. This is primarily due to the following factors‚ The schedule was re-baselined due to complexity of multiple procurements mobilisations.","narrativeClaimKind":null},{"id":"MOJ_0050_2122-Q3","year":2026,"name":"Evolve: WAN/LAN (Networks)","department":"MOJ","category":"Information and Communications Technology (ICT)","description":"Re-procurement of WAN and LAN Services suitable for the current and future needs of the MoJ. The project includes requirements gathering, procurement preparation and competitive procurement followed by the transition of services and exit of the existing contracts.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25-Q4, the Delivery Confidence Assessment (DCA) rating at 25/26-Q4 has increased to Green. This is primarily due to increased time contingency within plans, and significant activities being either complete or in progress in line with project plans.","startDate":"2021-09-27","endDate":"2028-12-15","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end date at 25/26-Q4 changed from 16/08/28 to 15/12/28. This is primarily due to revision of planned activity timelines to increase contingency based on insights from lessons learned.","fyBaseline":31.48,"fyForecast":6.67,"fyVariance":78.81,"varianceNarrative":"The budget variance exceeds 5%. The underspend is due to reduced in-year activities, requiring costs to be re-profiled into future years.","wholeLifeCost":253.89,"costNarrative":"Compared to financial year 24/25-Q4, the project's Whole Life Costs at 25/26-Q4 has increased from £253.20m to £253.89. This is primarily due to delays resulting in cost increases. All costs have been reported in 2024/25 base prices in line with NISTA requirements. This is a change from previous years where costs were reported in nominal prices. All costs reflect this accounting reduction regardless of any actual changes.","benefits":107.62,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's monetised benefits at 25/26-Q4 have increased from £0 to £107.62m. This is primarily due to the following factors‚ confirmation of monetisation of benefits following approval of Full Business Case. All costs have been reported in 2024/25 base prices in line with NISTA requirements. This is a change from previous years where costs were reported in nominal prices. All costs will reflect this accounting reduction regardless of any actual changes.","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 24/25-Q4, the Delivery Confidence Assessment (DCA) rating at 25/26-Q4 has increased to Green. This is primarily due to increased time contingency within plans, and significant activities being either complete or in progress in line with project plans. Compared to financial year 24/25-Q4, the project's end date at 25/26-Q4 changed…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end date at 25/26-Q4 changed from 16/08/28 to 15/12/28. This is primarily due to revision of planned activity timelines to increase contingency based on insights from lessons learned.","narrativeClaimKind":null}],"previous":{"id":"MOJ_0050_2122-Q3","year":2025,"name":"Evolve: WAN/LAN (Networks)","department":"MoJ","category":"ICT","description":"Re-procurement of WAN and LAN Services suitable for the current and future needs of the Authority, to replace the existing Future IT Services WAN/ LAN. The project includes requirements gathering, Procurement preparation and competitive procurement followed by the transition of services and exit of the existing contracts.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Timetable risks due to complexity of multiple procurements mobilisations and limited schedule contingency.","startDate":"2021-09-27","endDate":"2028-08-16","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 24/02/2028 to 16/08/2028. This is primarily due to the following factors‚ The schedule was re-baselined due to complexity of multiple procurements mobilisations.","fyBaseline":39.0,"fyForecast":7.5,"fyVariance":80.77,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The underspend is due to reduced in-year activities requiring costs to be re-profiled into future years.","wholeLifeCost":253.2,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 253. This is primarily due to the following factors‚ The Whole Life Cost has remained static, and the budget remains aligned to the current baseline business case.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ This project currently reports no monetised benefits. Confirmation of monetised benefits will be aligned to approval of Full Business Case.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Timetable risks due to complexity of multiple procurements mobilisations and limited schedule contingency. Compared to financial year 23/24-Q4, the project's end-date…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 24/02/2028 to 16/08/2028. This is primarily due to the following factors‚ The schedule was re-baselined due to complexity of multiple procurements mobilisations.","narrativeClaimKind":null},"ratingDelta":-1,"transition":"Improved","endDateDeltaDays":121,"attentionScore":22,"attentionReasons":["Published end date moved 121 days later","In-year forecast variance is +78.8%"]},{"id":"DWP_0028_1819-Q3","year":2026,"name":"Health Transformation Programme","department":"DWP","category":"Government Transformation and Service Delivery","description":"The Health Transformation Programme (HTP) is delivering major improvements to disability benefit services by ensuring consistent outcomes, more efficient operation, and improved capacity. The Programme delivers coordinated change across four linked areas: the Personal Independence Payment (PIP) service, health assessments, health and employment support, and the delivery of wider welfare reforms. HTP will transform the Personal Independence Payment (PIP) service by simplifying customer journeys, improving how evidence is gathered and used, and strengthening decision making. These changes are intended to deliver timely and consistent outcomes, while reducing unnecessary reassessments, reconsiderations and appeals. In parallel, the Programme will implement a single, DWP‑owned, Health Assessment Service (HAS) for benefits requiring functional assessments. HAS will replace multiple provider systems with one integrated service ensuring consistency, improving efficiency and Healthcare Professional capacity, and enabling more face‑to‑face assessments where appropriate. HAS is a core element of the future PIP operating model and underpins improvements in decision making and service performance. HTP will test a strengthened health and employment support offer, focused on enabling disabled people and people with health conditions to move towards greater independence and participation where appropriate, while improving continuity across DWP's services. In addition, the Programme provides the operational, digital and assessment capability required to deliver Benefit Reform safely within live services. Reforms will be introduced through a suitably phased, test‑and‑learn approach, enabling the department to respond to emerging evidence and adapt to future policy decisions, including recommendations arising from the Timms Review, without destabilising services. The Programme has refined its Programme Objectives into five Strategic Outcomes, which continue to define how HTP will deliver its Programme Vision of ‘A high quality and efficient service that enables disabled people and those with health conditions to access the help, advice and support they need’. These Strategic Outcomes are: - Increased customer trust in services and decisions. - More efficient service with reduced demand for health assessments. - Increased take up of wider support and employment. - Improved customer experience with shorter journey times. - Transformed in-house data and IT infrastructure that is secure.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. The 6 critical recommendations raised following the Gate 0 NISTA review in Q4 24/25 have all now been implemented and reported back to NISTA. NISTA will conduct a further Gate 0 review this year.","startDate":"2018-03-28","endDate":"2029-09-28","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same. The programme end-date reflects the end date of the five-year Functional Assessment Service contracts, which run until September 2029.","fyBaseline":73.11,"fyForecast":65.08,"fyVariance":10.98,"varianceNarrative":"The Variance is exceeds 5%. This is primarily due to reductions in costs from streamlining Programme staffing levels, supplier contract costs being lower than initial estimates and an adjustment to the new PIP service scaling plans resulting in a reduction to the predicted level of support for Disability Services in 25/26.","wholeLifeCost":735.46,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life costs at 25/26-Q4 decreased to £0.735bn. This is due to removing the costs of the FAS & FAS IT projects, as the projects are now closed and no longer part of the Programme.","benefits":13925.44,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 decreased to £13.93bn. This is due to removing the benefits of the FAS & FAS IT projects which are now closed and no longer part of the Programme.","themes":["Cost & funding","Governance & assurance","Commercial & supply chain","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. The 6 critical recommendations raised following the Gate 0 NISTA review in Q4 24/25 have all now been implemented and reported back to NISTA. NISTA will conduct a further Gate 0 review this year. Compared to financial year 24/25-Q4,…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same. The programme end-date reflects the end date of the five-year Functional Assessment Service contracts, which run until September 2029.","narrativeClaimKind":null,"history":[{"id":"DWP_0028_1819-Q3","year":2020,"name":"Health Transformation Programme","department":"DWP","category":"Government Transformation and Service Delivery","description":"To offer a more joined-up service to disabled people, the DWP Health Transformation Programme will be integrating the services that deliver PIP and Work Capability Assessments from 2021.nsform the health and disability services we provide for people with disabilities and health conditions.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Provision of�narrative�not possible due to prioritisation of Covid 19 response","startDate":"2018-03-28","endDate":"2024-03-31","scheduleNarrative":"Provision of�narrative�not possible due to prioritisation of Covid 19 response","fyBaseline":87.52,"fyForecast":66.38,"fyVariance":-24.0,"varianceNarrative":"Provision of�narrative�not possible due to prioritisation of Covid 19 response","wholeLifeCost":6598.76,"costNarrative":"Provision of�narrative�not possible due to prioritisation of Covid 19 response","benefits":null,"benefitsNarrative":"","themes":[],"evidenceExcerpt":"Provision of�narrative�not possible due to prioritisation of Covid 19 response Provision of�narrative�not possible due to prioritisation of Covid 19 response","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2020","sourceLabel":"IPA Annual Report 2019-20","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Provision of�narrative�not possible due to prioritisation of Covid 19 response","narrativeClaimKind":null},{"id":"DWP_0028_1819-Q3","year":2021,"name":"Health Transformation Programme","department":"DWP","category":"Government Transformation and Service Delivery","description":"To offer a more joined-up service to disabled people, the DWP Health Transformation Programme will be commissioning single suppliers of PIP and Work Capability Assessments in a given area from 2023. This will be an important step in improving the health and disability services we provide for people with disabilities and health conditions.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"The project is still at the planning stage and is not yet in a position to provide this information","startDate":null,"endDate":null,"scheduleNarrative":"The project is still at the planning stage and is not yet in a position to provide this information","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"The project is still at the planning stage and is not yet in a position to provide this information","wholeLifeCost":null,"costNarrative":"The project is still at the planning stage and is not yet in a position to provide this information","benefits":null,"benefitsNarrative":"","themes":[],"evidenceExcerpt":"The project is still at the planning stage and is not yet in a position to provide this information The project is still at the planning stage and is not yet in a position to provide this information","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project is still at the planning stage and is not yet in a position to provide this information","narrativeClaimKind":null},{"id":"DWP_0028_1819-Q3","year":2022,"name":"Health Transformation Programme","department":"DWP","category":"Government Transformation and Service Delivery","description":"The Health Transformation Programme is a critical part of the department's health and disability agenda. It will procure new functional assessment service contracts, modernise our service and be a key enabler for reform proposals detailed in the forthcoming White Paper. The Health Transformation Programme aims to deliver: A vastly improved claimant experience: including reduced journey times and improved claimant choice in terms of channel to claim. A more effective and efficient service for the taxpayer: reducing reliance on paper and integrating service delivery, reducing demand for health assessments by triaging. Greater capability to innovate and deliver change: including White Paper reform. All devolved benefits in Scotland, including Personal Independence Payment (PIP), are out of scope for the Health Transformation Programme.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 Amber. The Infrastructure Project Authority's input has been invaluable in ensuring successful progress. The three business cases (Functional Assessment Service, Functional Assessment Service IT and HTP Business Case) continue to evolve and the programme has completed an extensive re-plan of delivery activity to reflect these. However, the programme remains challenging and complex. As highlighted, key hotspots include short timescales for implementing the IT PIP Managed Service, procurement and transition to the Functional Assessment Service (FAS) itself and plans to extend the Health Transformation Area. Detailed contingency options for the FAS procurement are being developed, in case they are required.","startDate":"2018-03-28","endDate":"2028-12-29","scheduleNarrative":"Compared to 2021-Q4, your project end-date increased from 31 MAR 2024 to 29 DEC 2028 . This is primarily due to the following factors: The Programme schedule has been extended following an increase in scope and an agreed revised approach. During the COVID 19 outbreak the Programme was temporarily paused as people resources were deployed elsewhere to assist frontline operations. Following this, delivery activity was re-planned to cover: - Supporting policy reform and transformation ambitions across the end-to-end Personal Independence Payment journey and all functional health assessments. - Developing a new integrated service to deliver health assessments supported by a single digital platform developed by DWP. - Transforming the end-to-end PIP service, including introducing an option to apply online. - Procuring new Functional Assessment Services and the supporting IT for the period 2023-2028.","fyBaseline":57.97,"fyForecast":36.65,"fyVariance":-37.0,"varianceNarrative":"The budget variance exceeds 5%. 2021-22 Costs are lower than baseline as a result of challenges in bringing in resource coupled with changes in the plans and timetable for introducing operational initiatives meaning that the Programme did not incur the associated set up and recurring costs.","wholeLifeCost":3673.0,"costNarrative":"Compared to 2021-Q4, the projects Baseline Whole Life Cost decreased from 6598.77 (£m) to 3672.68 (£m). This is primarily due to the following factors: The previously reported whole life costs figure of £6598.77m was based on the strategic outline business case from 2018 and included operational costs which were not part of introducing change. The project has now developed revised business cases which only include the costs of the proposed changes to the service.","benefits":null,"benefitsNarrative":"","themes":["Delivery & schedule","Cost & funding","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 Amber. The Infrastructure Project Authority's input has been invaluable in ensuring successful progress. The three business cases (Functional Assessment Service, Functional Assessment Service IT and HTP Business Case) continue to…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to 2021-Q4, your project end-date increased from 31 MAR 2024 to 29 DEC 2028 . This is primarily due to the following factors: The Programme schedule has been extended following an increase in scope and an agreed revised approach. During the COVID 19 outbreak the Programme was temporarily paused as people resources were deployed elsewhere to assist frontline operations. Following this, delivery activity was re-planned to cover: - Supporting policy reform and transformation ambitions across the end-to-end Personal Independence Payment journey and all functional health assessments. - Developing a new integrated service to deliver health assessments supported by a single digital platform developed by DWP. - Transforming the end-to-end PIP service, including introducing an option to apply online. - Procuring new Functional Assessment Services and the supporting IT for the period 2023-2028.","narrativeClaimKind":null},{"id":"DWP_0028_1819-Q3","year":2023,"name":"Health Transformation Programme","department":"DWP","category":"Government Transformation and Service Delivery","description":"The Health Transformation Programme is a critical part of the department's disability strategy. It will procure new functional assessment service contracts, modernise our service and be a key enabler for reform proposals detailed in The Health and Disability White Paper published 16/03/23. The Health Transformation Programme aims to deliver: A vastly improved claimant experience: including reduced journey times and improved claimant choice in terms of channel to claim. A more effective and efficient service for the taxpayer: reducing reliance on paper and integrating service delivery, reducing demand for health assessments by triaging. Greater capability to innovate and deliver change: including White Paper reform. All devolved benefits in Scotland, including Personal Independence Payment (PIP), are out of scope for the Health Transformation Programme.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. With continued support from the Infrastructure Project Authority, HTP has progressed well with business case approval for Functional Assessment Service (FAS) and the Functional Assessment Service IT secured alongside comprehensive preparation for FAS to go live in 2024. The Department received a legal challenge to one of the FAS contract lots, which has delayed the procurement. However, a resolution has now been agreed with contracts still scheduled to be in place during 2023 to start in 2024. Following publication of the Health & Disability White Paper, HTP has been identified as a key delivery vehicle and work is underway to understand the impact. Plans to extend the Health Transformation Area are also underway and the next phase will be undertaken in close partnership with the new FAS providers. However, the programme remains challenging and complex so detailed scenario plans, that develop options for the most significant risks, have been developed so the programme has robust contingencies ready should they be needed.","startDate":"2018-03-28","endDate":"2029-03-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 increased from 2028-12-29 to 2029-03-31. This is primarily due to the following factors. The Programme schedule was previously extended as we made a short extension to the existing disability assessment services contracts, until March 2024, to facilitate the procurement and safe transition to the new contracts in order to prevent disruption to services. The Department then received a legal challenge to one of the FAS contract lots which has delayed the procurement. On 25th May the Department announced the outcome in three of the four contractual lots and procurement activity on the remaining lot has resumed, with contracts still scheduled to be in place during 2023 to start in 2024.","fyBaseline":125.99,"fyForecast":58.42,"fyVariance":-54.0,"varianceNarrative":"2022-23 Costs are lower than baseline as a result of challenges in bringing in resource coupled with changes in the plans and timetable for introducing operational initiatives meaning that the Programme did not incur the associated set up and recurring costs.","wholeLifeCost":3158.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 decreased from 3673m. to 3158m. This is primarily due to the following factors. Figures now reflect the outcome of the Functional Assessment Service (FAS) procurement exercise and the approved Final Business Case for the project.","benefits":5439.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 5439m. The reduction in benefits relates to an update on prior year benefits to the latest baseline position and the incorporation of FAS savings within FAS provider bids.","themes":["Commercial & supply chain","Cost & funding","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. With continued support from the Infrastructure Project Authority, HTP has progressed well with business case approval for Functional Assessment Service (FAS) and the…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 increased from 2028-12-29 to 2029-03-31. This is primarily due to the following factors. The Programme schedule was previously extended as we made a short extension to the existing disability assessment services contracts, until March 2024, to facilitate the procurement and safe transition to the new contracts in order to prevent disruption to services. The Department then received a legal challenge to one of the FAS contract lots which has delayed the procurement. On 25th May the Department announced the outcome in three of the four contractual lots and procurement activity on the remaining lot has resumed, with contracts still scheduled to be in place during 2023 to start in 2024.","narrativeClaimKind":null},{"id":"DWP_0028_1819-Q3","year":2024,"name":"Health Transformation Programme","department":"DWP","category":"Government Transformation and Service Delivery","description":"The Health Transformation Programme is a critical part of the department's disability strategy. It will procure new functional assessment service contracts, modernise our service and be a key enabler for reform proposals detailed in the forthcoming White Paper. The Health Transformation Programme aims to deliver: . A vastly improved claimant experience: including reduced journey times and improved claimant choice in terms of channel to claim. . A more effective and efficient service for the taxpayer: reducing reliance on paper and integrating service delivery, reducing demand for health assessments by triaging. . Greater capability to innovate and deliver change: including White Paper reform. . All devolved benefits in Scotland, including Personal Independence Payment (PIP), are out of scope for the Health Transformation Programme.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. The overall Programme rating is Amber due to the level of complexity and the current level of aggregate risk.","startDate":"2018-03-28","endDate":"2029-09-28","scheduleNarrative":"The project's end-date at 23/24-Q4 is 2029-09-28. This is primarily due to the following factors. The changed programme end-date reflects the end date of the Functional Assessment Service contracts, which run to this point. Due to delays in the procurement of the new contracts and the need to retain a sufficient implementation period, the start date of the new five-year contracts was delayed from March 2024 to September 2024.","fyBaseline":141.88,"fyForecast":93.72,"fyVariance":-34.0,"varianceNarrative":"The budget variance exceeds 5%. In-year actual variance to baseline results in the main from the fact that the Transformation baseline is still derived from the SOBC. Once the business case refresh has completed its full governance journey (Treasury Approval Point is awaited), it is expected that baselines and forecasts will be more closely aligned, with the variance reducing to -5% -10%, with the main cause being the delay in the FAS procurement.","wholeLifeCost":3165.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 increased from 3158m. to 3165m. This is primarily due to the following factors. FAS FBC refresh resulted in relatively minor increase to baselines costs.","benefits":5458.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 5458m.","themes":["Cost & funding","Approvals & decisions","Commercial & supply chain","Delivery & schedule"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. The overall Programme rating is Amber due to the level of complexity and the current level of aggregate risk. The project's end-date at 23/24-Q4 is 2029-09-28. This is primarily due to the following factors. The…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 23/24-Q4 is 2029-09-28. This is primarily due to the following factors. The changed programme end-date reflects the end date of the Functional Assessment Service contracts, which run to this point. Due to delays in the procurement of the new contracts and the need to retain a sufficient implementation period, the start date of the new five-year contracts was delayed from March 2024 to September 2024.","narrativeClaimKind":null},{"id":"DWP_0028_1819-Q3","year":2025,"name":"Health Transformation Programme","department":"DWP","category":"Government Transformation and Service Delivery","description":"The Health Transformation Programme (HTP) is transforming the service that supports over 2 million people with disabilities and health conditions who apply for health-related benefits every year, putting claimants at the heart of the service to provide the best possible experience (which is also more efficient and cost effective). We are concentrating on key areas including: • Providing greater choice for how Personal Independence Payment (PIP) assessments are conducted i.e. use of video assessments. We have already introduced telephone assessments – which can also be recorded upon request. • Better use of medical evidence and data-sharing. We will improve how we use information, including working more closely with the NHS and sharing data more effectively, improving the quality of decisions we make, and the level of support we can provide. • Better support and signposting. Making people aware of other benefits and services which could help them, so that they can more easily access the support they need. This can be particularly helpful when people are claiming benefits for the first time. • Reducing Disputes and Appeals. Mandatory Reconsiderations (MR) give people an early opportunity to challenge our decisions, with an effective MR process meaning fewer decisions going to appeal. Appeals are stressful and time-consuming for claimants, as well as costly for government. We want to improve the way we make decisions, focusing on how we gather information and make this available to everybody involved in the decision-making process. Objectives will be delivered across three broad areas of work: • Transformation of the entire PIP service, from finding out about benefits and eligibility through to applications, decisions and payments, aiming for all PIP new claims to go through the new service by 2029/30 • Development of a new approach to health assessments that is more efficient and tailored to customer needs that will be fully implemented by 2029/30 • HTP will play a key role in delivering the government’s Health & Disability reforms","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Following Gate 0 review in Q4 24/25, the IPA awarded HTP with an amber rating accompanied with 6 critical recommendations. This enabled the programme to proceed to the next stage, with the recommendations being progressed, and will report back to IPA/NISTA by end Q2 25/26.","startDate":"2018-03-28","endDate":"2029-09-28","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 28/09/2029. This is primarily due to the following factors‚ The programme end-date reflects the end date of the five-year Functional Assessment Service contracts, which run to September 29.","fyBaseline":367.42,"fyForecast":434.73,"fyVariance":18.32,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The adverse Variance of £67m is primarily driven by the Functional Assessment service (FAS) (£42m) where additional funding was secured from HMT in Spring 2024 to increase the volumes of assessments within the FAS contracts. This additional funding was not included in FAS business case and therefore is not part of the baseline. The remaining variance of £24m relates to FAS IT, where the Baseline reflects an original planned go-live in 2023/24. Go-live was subsequently delayed until September 2024 which resulted in a higher level of costs being incurred during 2024/25 than originally anticipated.","wholeLifeCost":2987.05,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 3165 to 2987. This is primarily due to the following factors‚ Movement is largely the result of updating baselines to reflect the latest HMT approved Programme Business Case (PBC).","benefits":18807.18,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 5458 to 18807. This is primarily due to the following factors‚ Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 5458 to 18807. This is primarily due to the following factors - Movement is largely the result of updating baselines to reflect the latest HMT approved Programme Business Case (PBC) which was based on the programme delivery plan to 2029/2030 as of August 2023. The updated programme business case includes wider societal savings driven by policy reform, which were not reflected in the programmes previous business case.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Following Gate 0 review in Q4 24/25, the IPA awarded HTP with an amber rating accompanied with 6 critical recommendations. This enabled the programme to proceed to…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 28/09/2029. This is primarily due to the following factors‚ The programme end-date reflects the end date of the five-year Functional Assessment Service contracts, which run to September 29.","narrativeClaimKind":null},{"id":"DWP_0028_1819-Q3","year":2026,"name":"Health Transformation Programme","department":"DWP","category":"Government Transformation and Service Delivery","description":"The Health Transformation Programme (HTP) is delivering major improvements to disability benefit services by ensuring consistent outcomes, more efficient operation, and improved capacity. The Programme delivers coordinated change across four linked areas: the Personal Independence Payment (PIP) service, health assessments, health and employment support, and the delivery of wider welfare reforms. HTP will transform the Personal Independence Payment (PIP) service by simplifying customer journeys, improving how evidence is gathered and used, and strengthening decision making. These changes are intended to deliver timely and consistent outcomes, while reducing unnecessary reassessments, reconsiderations and appeals. In parallel, the Programme will implement a single, DWP‑owned, Health Assessment Service (HAS) for benefits requiring functional assessments. HAS will replace multiple provider systems with one integrated service ensuring consistency, improving efficiency and Healthcare Professional capacity, and enabling more face‑to‑face assessments where appropriate. HAS is a core element of the future PIP operating model and underpins improvements in decision making and service performance. HTP will test a strengthened health and employment support offer, focused on enabling disabled people and people with health conditions to move towards greater independence and participation where appropriate, while improving continuity across DWP's services. In addition, the Programme provides the operational, digital and assessment capability required to deliver Benefit Reform safely within live services. Reforms will be introduced through a suitably phased, test‑and‑learn approach, enabling the department to respond to emerging evidence and adapt to future policy decisions, including recommendations arising from the Timms Review, without destabilising services. The Programme has refined its Programme Objectives into five Strategic Outcomes, which continue to define how HTP will deliver its Programme Vision of ‘A high quality and efficient service that enables disabled people and those with health conditions to access the help, advice and support they need’. These Strategic Outcomes are: - Increased customer trust in services and decisions. - More efficient service with reduced demand for health assessments. - Increased take up of wider support and employment. - Improved customer experience with shorter journey times. - Transformed in-house data and IT infrastructure that is secure.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. The 6 critical recommendations raised following the Gate 0 NISTA review in Q4 24/25 have all now been implemented and reported back to NISTA. NISTA will conduct a further Gate 0 review this year.","startDate":"2018-03-28","endDate":"2029-09-28","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same. The programme end-date reflects the end date of the five-year Functional Assessment Service contracts, which run until September 2029.","fyBaseline":73.11,"fyForecast":65.08,"fyVariance":10.98,"varianceNarrative":"The Variance is exceeds 5%. This is primarily due to reductions in costs from streamlining Programme staffing levels, supplier contract costs being lower than initial estimates and an adjustment to the new PIP service scaling plans resulting in a reduction to the predicted level of support for Disability Services in 25/26.","wholeLifeCost":735.46,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life costs at 25/26-Q4 decreased to £0.735bn. This is due to removing the costs of the FAS & FAS IT projects, as the projects are now closed and no longer part of the Programme.","benefits":13925.44,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 decreased to £13.93bn. This is due to removing the benefits of the FAS & FAS IT projects which are now closed and no longer part of the Programme.","themes":["Cost & funding","Governance & assurance","Commercial & supply chain","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. The 6 critical recommendations raised following the Gate 0 NISTA review in Q4 24/25 have all now been implemented and reported back to NISTA. NISTA will conduct a further Gate 0 review this year. Compared to financial year 24/25-Q4,…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same. The programme end-date reflects the end date of the five-year Functional Assessment Service contracts, which run until September 2029.","narrativeClaimKind":null}],"previous":{"id":"DWP_0028_1819-Q3","year":2025,"name":"Health Transformation Programme","department":"DWP","category":"Government Transformation and Service Delivery","description":"The Health Transformation Programme (HTP) is transforming the service that supports over 2 million people with disabilities and health conditions who apply for health-related benefits every year, putting claimants at the heart of the service to provide the best possible experience (which is also more efficient and cost effective). We are concentrating on key areas including: • Providing greater choice for how Personal Independence Payment (PIP) assessments are conducted i.e. use of video assessments. We have already introduced telephone assessments – which can also be recorded upon request. • Better use of medical evidence and data-sharing. We will improve how we use information, including working more closely with the NHS and sharing data more effectively, improving the quality of decisions we make, and the level of support we can provide. • Better support and signposting. Making people aware of other benefits and services which could help them, so that they can more easily access the support they need. This can be particularly helpful when people are claiming benefits for the first time. • Reducing Disputes and Appeals. Mandatory Reconsiderations (MR) give people an early opportunity to challenge our decisions, with an effective MR process meaning fewer decisions going to appeal. Appeals are stressful and time-consuming for claimants, as well as costly for government. We want to improve the way we make decisions, focusing on how we gather information and make this available to everybody involved in the decision-making process. Objectives will be delivered across three broad areas of work: • Transformation of the entire PIP service, from finding out about benefits and eligibility through to applications, decisions and payments, aiming for all PIP new claims to go through the new service by 2029/30 • Development of a new approach to health assessments that is more efficient and tailored to customer needs that will be fully implemented by 2029/30 • HTP will play a key role in delivering the government’s Health & Disability reforms","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Following Gate 0 review in Q4 24/25, the IPA awarded HTP with an amber rating accompanied with 6 critical recommendations. This enabled the programme to proceed to the next stage, with the recommendations being progressed, and will report back to IPA/NISTA by end Q2 25/26.","startDate":"2018-03-28","endDate":"2029-09-28","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 28/09/2029. This is primarily due to the following factors‚ The programme end-date reflects the end date of the five-year Functional Assessment Service contracts, which run to September 29.","fyBaseline":367.42,"fyForecast":434.73,"fyVariance":18.32,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The adverse Variance of £67m is primarily driven by the Functional Assessment service (FAS) (£42m) where additional funding was secured from HMT in Spring 2024 to increase the volumes of assessments within the FAS contracts. This additional funding was not included in FAS business case and therefore is not part of the baseline. The remaining variance of £24m relates to FAS IT, where the Baseline reflects an original planned go-live in 2023/24. Go-live was subsequently delayed until September 2024 which resulted in a higher level of costs being incurred during 2024/25 than originally anticipated.","wholeLifeCost":2987.05,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 3165 to 2987. This is primarily due to the following factors‚ Movement is largely the result of updating baselines to reflect the latest HMT approved Programme Business Case (PBC).","benefits":18807.18,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 5458 to 18807. This is primarily due to the following factors‚ Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 5458 to 18807. This is primarily due to the following factors - Movement is largely the result of updating baselines to reflect the latest HMT approved Programme Business Case (PBC) which was based on the programme delivery plan to 2029/2030 as of August 2023. The updated programme business case includes wider societal savings driven by policy reform, which were not reflected in the programmes previous business case.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Following Gate 0 review in Q4 24/25, the IPA awarded HTP with an amber rating accompanied with 6 critical recommendations. This enabled the programme to proceed to…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 28/09/2029. This is primarily due to the following factors‚ The programme end-date reflects the end date of the five-year Functional Assessment Service contracts, which run to September 29.","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":0,"attentionScore":22,"attentionReasons":["Current published delivery confidence is Amber","In-year forecast variance is +11.0%"]},{"id":"BEIS_0005_1920-Q4","year":2026,"name":"Met Office Supercomputer Programme","department":"DSIT","category":"Information and Communications Technology (ICT)","description":"Delivering our future Supercomputing capability through the procurement and installation of a replacement and increased Supercomputing Capacity. This includes storage, observation networks, post processing systems and services, tooling for data exploitation delivery and support resources throughout the investment lifetime, data centre hosting, networking security services and decommissioning.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber This is primarily due to‚ supplier delivery delays have delayed our Science Plans which has impacted the service improvements leading to a risk in Socio Economic Benefits realisation.","startDate":"2018-01-01","endDate":"2032-07-11","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained at 11/07/2032 This is primarily due to the following factors‚ No changes to length of the supplier contractual agreement, this remains the closure target for this investment.","fyBaseline":91.18,"fyForecast":80.53,"fyVariance":11.68,"varianceNarrative":"The budget variance in year exceeds 5% due to supplier delays and therefore the re profiling of supplier milestone payments.","wholeLifeCost":1204.33,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) remained at £1242 to £1242 This is primarily due to the length of the contract being unchanged and we are developing interventions, redirecting the delayed spend to help recover at risk benefits. The delays are changing in year spend profiles, but this does not alter the expected whole life cost.","benefits":11904.44,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) decreased from £14,027 to 12,710 This is primarily due to the following factors: • Introduction of the new climate SEB methodology that has been updated to align with the updated approach, approved in the Valuing the Met Office (2024) Study, which itself was informed in 2024 when The Department for Energy Security and Net Zero (DESNZ) commissioned a study of the value of Met Office climate science and services as part of an evaluation of the value of the Hadley Centre Climate Programme. This revised approach was, in turn, incorporated into the 2024 study of the economic value of the Met Office, completed by London Economics. • Latest external economic data including latest GDP, inflation and Euro exchange figures from the March 2026 OBR Fiscal report and updated UK Airport Movement figures for 2025 from the Civil Aviation Authority.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber This is primarily due to‚ supplier delivery delays have delayed our Science Plans which has impacted the service improvements leading to a risk in Socio Economic Benefits realisation. Compared to financial year 24/25-Q4, the project's…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained at 11/07/2032 This is primarily due to the following factors‚ No changes to length of the supplier contractual agreement, this remains the closure target for this investment.","narrativeClaimKind":null,"history":[{"id":"BEIS_0005_1920-Q4","year":2021,"name":"Met Office Supercomputing 2020+ Programme","department":"BEIS","category":"ICT","description":"Delivering our future supercomputing capability through the procurement and installation of a replacement and increased supercomputing capacity to meet the contracted end of life timescales of our current systems. This will include: storage, observations networks, post-processing systems and services, tooling for data exploitation; delivery and support resources throughout the investment lifetime; data centre hosting, networking and security services.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber/Green.This is primarily due to the following factors: The programme continues to report as amber, due to the tight timescales and the complexity of the programme. The risk of delays are being mitigated where possible, we successfully passed the pre PIC panel in Dec and achieved FBC approval in Feruary 2021. Procurement process is nearing its final stages and the Programme has assigned a Programme Director and recruited a Programme Manager.","startDate":"2018-01-01","endDate":"2032-08-11","scheduleNarrative":"The project end-date is 11 August 2032. This is primarily due to the following factors: The programme is expected to sign the contract for this investment on 16-Apr-21 as scheduled.. The schedule is baselined at that point and at present there are no expected deviations.","fyBaseline":6.9,"fyForecast":6.9,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%. There is currently no budget variance. Full term forecast now entered to reflect preferred bidder costings. Final Business Case approval confirmed so programme has been re-baselined to reflect this new approval.","wholeLifeCost":1242.05,"costNarrative":"The projects Baseline Whole Life Cost is �1242.05m. This is primarily due to the following factors: Overall programme costs are just over �20m higher than last submission reflecting the new approval. Cost increase is due to programme estimates across all aspects of the programme being higher than in original submissions, partly as a result of the winning bidders technical solution.","benefits":null,"benefitsNarrative":"","themes":["Approvals & decisions","Cost & funding","Commercial & supply chain","Delivery & schedule"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber/Green.This is primarily due to the following factors: The programme continues to report as amber, due to the tight timescales and the complexity of the programme. The risk of delays are being mitigated where possible, we successfully passed the pre PIC panel in Dec and…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project end-date is 11 August 2032. This is primarily due to the following factors: The programme is expected to sign the contract for this investment on 16-Apr-21 as scheduled.. The schedule is baselined at that point and at present there are no expected deviations.","narrativeClaimKind":null},{"id":"BEIS_0005_1920-Q4","year":2022,"name":"Met Office Supercomputing 2020+ Programme","department":"BEIS","category":"ICT","description":"Delivering our future supercomputing capability through the procurement and installation of a replacement and increased supercomputing capacity to meet the contracted end of life timescales of our current systems. This will include storage, observations networks, post processing systems and services, tooling for data exploitation, delivery and support resources throughout the investment lifetime, data centre hosting, networking, security services and decommissioning .","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 20/21-Q4, the Delivery Confidence Assessment rating at 21/22-Q4 increased from Amber/Green to Amber Procurement phase and approval phase is complete and we are into the delivery phase of the programme. The last review was in Dec 2020, those actions have been met.","startDate":"2018-01-01","endDate":"2032-08-11","scheduleNarrative":"Compared to 2021-Q4, your project end-date remained scheduled to finish on 11 AUG 2032 . This is primarily due to the following factors: We have experienced supplier delays which had delayed our key implementation milestones, this was due to supply chain issues on behalf of the supplier and their sub contractors. A replanning exercise is due to be completed imminently.","fyBaseline":37.07,"fyForecast":18.08,"fyVariance":-51.0,"varianceNarrative":"The programme is under spent, this year as delays to the implementation have caused key milestones and subsequent payment to move into later years.","wholeLifeCost":1242.0,"costNarrative":"Compared to 2021-Q4,the projects Baseline Whole Life Cost remained at 1242.05 (£m). This is primarily due to the following factors: Whole life baseline costs remain unchanged, but due to supplier delays we are showing a reduction in the forecast as costs are re profiled.","benefits":null,"benefitsNarrative":"","themes":["Commercial & supply chain","Cost & funding","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Delivery Confidence Assessment rating at 21/22-Q4 increased from Amber/Green to Amber Procurement phase and approval phase is complete and we are into the delivery phase of the programme. The last review was in Dec 2020, those actions have been met. Compared to 2021-Q4, your project end-date remained scheduled to…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to 2021-Q4, your project end-date remained scheduled to finish on 11 AUG 2032 . This is primarily due to the following factors: We have experienced supplier delays which had delayed our key implementation milestones, this was due to supply chain issues on behalf of the supplier and their sub contractors. A replanning exercise is due to be completed imminently.","narrativeClaimKind":null},{"id":"BEIS_0005_1920-Q4","year":2023,"name":"Met Office Supercomputing 2020+ Programme","department":"DSIT","category":"ICT","description":"Delivering our future supercomputing capability through the procurement and installation of a replacement and increased supercomputing capacity. This includes storage, observation networks, post processing systems and services, tooling for data exploitation delivery and support resources throughout the investment lifetime, data centre hosting, networking security services and decommissioning .","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 21/22-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. Procurement and approval phase are complete and we are now in the delivery phase of the Programme. IPA actions have been completed","startDate":"2018-01-01","endDate":"2032-08-11","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2032-08-11. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2032-08-11. This is primarily due to the following factors. We have experienced supplier delays which had delayed our key implementation milestones, this was due to supply chain issues on behalf of the supplier and their sub contractors. A re-planning exercise is currently being completed with the supplier and should conclude by the end of April. The project end date remains the same","fyBaseline":191.09,"fyForecast":48.24,"fyVariance":-75.0,"varianceNarrative":"The Programme is under spent this year as delays to implementation have caused key milestones and subsequent payments to move into later years.","wholeLifeCost":1242.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 remained at 1242m. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 remained at 1242m. This is primarily due to the following factors. Whole life baseline costs remain the unchanged, but due to supplier delays we are showing a reduction in the forecast as costs are re profiled.","benefits":17874.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 17874m. Benefits forecast has been amended primarily based on the delays to implementation.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. Procurement and approval phase are complete and we are now in the delivery phase of the Programme. IPA actions have been completed Compared to financial year 21/22-Q4, the…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2032-08-11. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2032-08-11. This is primarily due to the following factors. We have experienced supplier delays which had delayed our key implementation milestones, this was due to supply chain issues on behalf of the supplier and their sub contractors. A re-planning exercise is currently being completed with the supplier and should conclude by the end of April. The project end date remains the same","narrativeClaimKind":null},{"id":"BEIS_0005_1920-Q4","year":2024,"name":"Met Office Supercomputing 2020+ Programme","department":"DSIT","category":"ICT","description":"Delivering our future Supercomputing capability through the procurement and installation of a replacement and increased Supercomputing Capacity. This includes storage, observation networks, post processing systems and services, tooling for data exploitation delivery and support resources throughout the investment lifetime, data centre hosting, networking security services and decommissioning.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. IPA Gate 4 took place in February with a Green Rating. Four recommendations were made all of which are underway.","startDate":"2018-01-01","endDate":"2032-07-11","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 decreased from 2032-08-11 to 2032-07-11. This is primarily due to the following factors. We have experienced substantial supplier delays which has delayed key implementation milestones. These delays have been due to supply chain issues and supplier performance. A re planning exercise is underway and we expect to have newly formalised plan by the end of April. The project end date remains the same.","fyBaseline":100.94,"fyForecast":47.53,"fyVariance":-53.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The programme is underspent due to due to substantial supplier delays that have caused milestones and subsequent payments to move into later years.","wholeLifeCost":1242.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 remained at 1242m. This is primarily due to the following factors. Whole life baseline costs remain unchanged, but due to significant supplier delays we are showing a reduction in the forecast as the costs are re profiled.","benefits":16802.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 2324-Q4 decreased from 17874m. to 16802m. Benefits forecast has been amended primarily based on the delays to implementation.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. IPA Gate 4 took place in February with a Green Rating. Four recommendations were made all of which are underway. Compared to financial year 22/23-Q4, the project's end-date…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 decreased from 2032-08-11 to 2032-07-11. This is primarily due to the following factors. We have experienced substantial supplier delays which has delayed key implementation milestones. These delays have been due to supply chain issues and supplier performance. A re planning exercise is underway and we expect to have newly formalised plan by the end of April. The project end date remains the same.","narrativeClaimKind":null},{"id":"BEIS_0005_1920-Q4","year":2025,"name":"Met Office Supercomputer Programme","department":"DSIT","category":"ICT","description":"Delivering our future Supercomputing capability through the procurement and installation of a replacement and increased Supercomputing Capacity. This includes storage, observation networks, post processing systems and services, tooling for data exploitation delivery and support resources throughout the investment lifetime, data centre hosting, networking security services and decommissioning.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Supplier delivery delays have delayed our science plans which has impacted the service improvements leading to a risk of reduction in Socio Economic Benefits.","startDate":"2018-01-01","endDate":"2032-07-11","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 11/07/2032. This is primarily due to the following factors‚ No changes to length of the supplier contractual agreement, this remains the closure target for this investment.","fyBaseline":95.23,"fyForecast":100.25,"fyVariance":5.27,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ Supplier delays have meant that the financial profile has changed, as delivery milestones and associated payments have moved to a later date.","wholeLifeCost":1242.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 1242. This is primarily due to the following factors‚ The length of the contract is unchanged and we are developing interventions, redirecting the delayed spend to help recover at risk benefits. The delays are changing in year spend profiles, but this does not alter the expected whole life cost.","benefits":null,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) decreased from 16802 to 11203. This is primarily due to the following factors‚ Supplier delivery delays have meant that benefits are at risk of not being fully achieved, within the agreed investment window.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Supplier delivery delays have delayed our science plans which has impacted the service improvements leading to a risk of reduction in Socio Economic Benefits.…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 11/07/2032. This is primarily due to the following factors‚ No changes to length of the supplier contractual agreement, this remains the closure target for this investment.","narrativeClaimKind":null},{"id":"BEIS_0005_1920-Q4","year":2026,"name":"Met Office Supercomputer Programme","department":"DSIT","category":"Information and Communications Technology (ICT)","description":"Delivering our future Supercomputing capability through the procurement and installation of a replacement and increased Supercomputing Capacity. This includes storage, observation networks, post processing systems and services, tooling for data exploitation delivery and support resources throughout the investment lifetime, data centre hosting, networking security services and decommissioning.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber This is primarily due to‚ supplier delivery delays have delayed our Science Plans which has impacted the service improvements leading to a risk in Socio Economic Benefits realisation.","startDate":"2018-01-01","endDate":"2032-07-11","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained at 11/07/2032 This is primarily due to the following factors‚ No changes to length of the supplier contractual agreement, this remains the closure target for this investment.","fyBaseline":91.18,"fyForecast":80.53,"fyVariance":11.68,"varianceNarrative":"The budget variance in year exceeds 5% due to supplier delays and therefore the re profiling of supplier milestone payments.","wholeLifeCost":1204.33,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) remained at £1242 to £1242 This is primarily due to the length of the contract being unchanged and we are developing interventions, redirecting the delayed spend to help recover at risk benefits. The delays are changing in year spend profiles, but this does not alter the expected whole life cost.","benefits":11904.44,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) decreased from £14,027 to 12,710 This is primarily due to the following factors: • Introduction of the new climate SEB methodology that has been updated to align with the updated approach, approved in the Valuing the Met Office (2024) Study, which itself was informed in 2024 when The Department for Energy Security and Net Zero (DESNZ) commissioned a study of the value of Met Office climate science and services as part of an evaluation of the value of the Hadley Centre Climate Programme. This revised approach was, in turn, incorporated into the 2024 study of the economic value of the Met Office, completed by London Economics. • Latest external economic data including latest GDP, inflation and Euro exchange figures from the March 2026 OBR Fiscal report and updated UK Airport Movement figures for 2025 from the Civil Aviation Authority.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber This is primarily due to‚ supplier delivery delays have delayed our Science Plans which has impacted the service improvements leading to a risk in Socio Economic Benefits realisation. Compared to financial year 24/25-Q4, the project's…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained at 11/07/2032 This is primarily due to the following factors‚ No changes to length of the supplier contractual agreement, this remains the closure target for this investment.","narrativeClaimKind":null}],"previous":{"id":"BEIS_0005_1920-Q4","year":2025,"name":"Met Office Supercomputer Programme","department":"DSIT","category":"ICT","description":"Delivering our future Supercomputing capability through the procurement and installation of a replacement and increased Supercomputing Capacity. This includes storage, observation networks, post processing systems and services, tooling for data exploitation delivery and support resources throughout the investment lifetime, data centre hosting, networking security services and decommissioning.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Supplier delivery delays have delayed our science plans which has impacted the service improvements leading to a risk of reduction in Socio Economic Benefits.","startDate":"2018-01-01","endDate":"2032-07-11","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 11/07/2032. This is primarily due to the following factors‚ No changes to length of the supplier contractual agreement, this remains the closure target for this investment.","fyBaseline":95.23,"fyForecast":100.25,"fyVariance":5.27,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ Supplier delays have meant that the financial profile has changed, as delivery milestones and associated payments have moved to a later date.","wholeLifeCost":1242.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 1242. This is primarily due to the following factors‚ The length of the contract is unchanged and we are developing interventions, redirecting the delayed spend to help recover at risk benefits. The delays are changing in year spend profiles, but this does not alter the expected whole life cost.","benefits":null,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) decreased from 16802 to 11203. This is primarily due to the following factors‚ Supplier delivery delays have meant that benefits are at risk of not being fully achieved, within the agreed investment window.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Supplier delivery delays have delayed our science plans which has impacted the service improvements leading to a risk of reduction in Socio Economic Benefits.…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 11/07/2032. This is primarily due to the following factors‚ No changes to length of the supplier contractual agreement, this remains the closure target for this investment.","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":0,"attentionScore":22,"attentionReasons":["Current published delivery confidence is Amber","In-year forecast variance is +11.7%"]},{"id":"DHSC_0069_2021-Q4","year":2026,"name":"NHS Digital Transformation of Screening","department":"DHSC","category":"Government Transformation and Service Delivery","description":"NHS England is transforming the digital services that support the national screening programmes. This work replaces paper-based processes and outdated technology with modern digital services designed to be secure, reliable and easier to use. The new services help people better understand and manage their screening information, including their history and appointments, and support staff by automating manual processes, improving how screening services are managed and delivered. This transformation programme has designed and delivered shared digital services for screening programmes, alongside support for people who may need help accessing digital services and wider service improvements. The work also implements key recommendations from the 2019 independent review of screening led by Professor Sir Mike Richards. This phase of the programme closes at the end of March 2026.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The programme’s Delivery Confidence Assessment (DCA) rating remains Amber, reflecting the challenges associated with the scale and complexity of the transformation, while confirming that its objectives remain achievable. Since HM Treasury approval of the Programme Business Case in July 2023, the programme has made significant progress in modernising national screening services. Key milestones met include the introduction of digital communications for cervical and bowel screening programmes, and progress towards digital breast screening and human papillomavirus (HPV) self-testing. IPA/NISTA gateway reviews in 2025 and 2026 confirmed that delivery remains feasible. The programme is within budget and continues to progress toward its goals of improving screening safety and participation, modernising technology, and delivering more efficient, innovative services.","startDate":"2022-04-01","endDate":"2033-03-30","scheduleNarrative":"A Programme Business Case (PBC) Addendum extended spend approval to March 2026, to allow time for the full PBC refresh following the 2025 Spending Review. Delivery has progressed well, with new digital services for cervical, and bowel screening deployed, and services such as Manage Breast Screening. The programme is now transitioning to be part of the wider Transforming Patient, Public and Staff-facing Services programme from April 2026, which will retain existing organisational and governance arrangements to support continued delivery.","fyBaseline":33.8,"fyForecast":37.68,"fyVariance":11.46,"varianceNarrative":"£2.7m of in-year variance is driven by an accounting adjustment following reassessment of spend capitalised in prior years, resulting in an in-year Revenue charge. The remaining overspend of £1.3m equates to 3.7% and is within the optimism bias value of the case.","wholeLifeCost":94.5,"costNarrative":"The original WLC estimate set in the original 2023 PBC, with one off cost spend due to end March 29. This was updated in the PBC Addendum to a one off cost spend ending in Mar 26, which reduced the WLC. This reflects the decision to replace the DToS programme with a new, larger programme that included investment for screening alongside other areas of investment.","benefits":3767.13,"benefitsNarrative":"Compared to financial year 24/25-Q4, the programme's departmental benefits estimate at 25/26-Q4 has decreased . The main drivers for the change in benefits estimation for the programme are: - Changes to the treatment of QUALY benefits, figures have been updated with 25/26 actuals and onward forecasting aligned with the wider Transforming Patient, Public and Staff-facing Services programme business case.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Technical & integration"],"evidenceExcerpt":"The programme’s Delivery Confidence Assessment (DCA) rating remains Amber, reflecting the challenges associated with the scale and complexity of the transformation, while confirming that its objectives remain achievable. Since HM Treasury approval of the Programme Business Case in July 2023, the programme has made significant progress in modernising…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"A Programme Business Case (PBC) Addendum extended spend approval to March 2026, to allow time for the full PBC refresh following the 2025 Spending Review. Delivery has progressed well, with new digital services for cervical, and bowel screening deployed, and services such as Manage Breast Screening. The programme is now transitioning to be part of the wider Transforming Patient, Public and Staff-facing Services programme from April 2026, which will retain existing organisational and governance arrangements to support continued delivery.","narrativeClaimKind":null,"history":[{"id":"DHSC_0069_2021-Q4","year":2024,"name":"Digital Transformation of Screening_old","department":"DHSC","category":"Government Transformation and Service Delivery","description":"The Digital Transformation of Screening Programme (DToS), covers work required to design, develop and deliver new shared screening services and supporting digital products and assisted digital support, and the associated change delivery. _x000D_ _x000D_ Our vision aims to implement key recommendations in Professor Sir Mike Richards 2019 review which set out the need to improve IT systems to support the safe and effective delivery of screening services.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 is Red. This is primarily due to the following factors. The programme continues to report Red although significant progress has been made, transitioning the programme into its delivery phase. The initial Statement of Work with the screening delivery partner was approved and has begun. From the end of January 2024, teams have been onboarding and teams are now fully mobilised._x000D_ _x000D_ _x000D_ Over the coming months the following actions are planned to further improve the RAG rating:_x000D_ -Confirmation of 2024/25 budget for the programme_x000D_ -Development of the Release 0 detailed delivery plan completed and pilot locations agreed_x000D_ -Design and build of CaaS Integration Service to transition the cohorting service for Breast Screening and Diabetic Eye Screening_x000D_ -Plan and scope outlined to utilise Breast Screening Select to support DToS Releases_x000D_ -Continue to monitor the progress of SoW approvals and push for prompt sign off at each stage","startDate":"2022-04-01","endDate":"2033-03-30","scheduleNarrative":"The project's end-date at 23/24-Q4 is 2033-03-30. This is primarily due to the following factors. The project's end-date at 23/24-Q4 is schedule to finish on 30-MAR-2033. This is the date of the programme lifetime, the programme is a 10 year planned programme to deliver digital transformation to other screening services, not just the Breast and Diabetic eye that is mentioned in the current reporting. As per the options discussed in the current PBC there is remaining services that will benefit from Digital Transformation, AAA, Bowel, Lung, Grail, AN + NB, Cervical) and prioritisation of these will take place in further options appraisals in the following PBC's that will be presented to HMT","fyBaseline":31.2,"fyForecast":7.72,"fyVariance":-75.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The budget variance exceeds 5%. This is primarily due to the delay in onboarding of external suppliers costs have been pushed into following years. However, Costs are now refined to reflect actual year end position for the year after bringing in IBM back on board in Jan 24. _x000D_ The main increase since last submission in M09 is due to continuation of Cohorting as a Service Live Services recharge for Cohort Manager running from FY24/25-FY25/26 (2m)_x000D_ There maybe a further tweak over the next 2 months to March 24 as we continue to finalise spending.","wholeLifeCost":113.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 23/24-Q4 is 113m. This is primarily due to the following factors. Baseline whole life costs remain in line with the latest approved business case","benefits":610.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 610m. The project departmental-agree Benefits at 23/24-Q4 is 0. This is primarily due to NHS England has been slower than envisaged in the business case to start the project.","themes":["Delivery & schedule","Cost & funding","Technical & integration","Scope & requirements"],"evidenceExcerpt":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 is Red. This is primarily due to the following factors. The programme continues to report Red although significant progress has been made, transitioning the programme into its delivery phase. The initial Statement of Work with the screening delivery partner was approved and has…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 23/24-Q4 is 2033-03-30. This is primarily due to the following factors. The project's end-date at 23/24-Q4 is schedule to finish on 30-MAR-2033. This is the date of the programme lifetime, the programme is a 10 year planned programme to deliver digital transformation to other screening services, not just the Breast and Diabetic eye that is mentioned in the current reporting. As per the options discussed in the current PBC there is remaining services that will benefit from Digital Transformation, AAA, Bowel, Lung, Grail, AN + NB, Cervical) and prioritisation of these will take place in further options appraisals in the following PBC's that will be presented to HMT","narrativeClaimKind":null},{"id":"DHSC_0069_2021-Q4","year":2025,"name":"NHS Digital Transformation of Screening","department":"DHSC","category":"Government Transformation and Service Delivery","description":"The NHS Digital Transformation of Screening Programme (DToS), covers work required to design, develop and deliver new shared screening services and supporting digital products and assisted digital support, and the associated change delivery. Our vision aims to implement key recommendations in Professor Sir Mike Richards review which set out the need to improve IT systems to support the safe and effective delivery of screening services.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from RED to AMBER. This is primarily due to the following factors‚ the programme having now commenced delivery with new digital products being developed, tested and scaled. There is work in progress to secure future funding beyond 2025/6 and agree a commercial approach for technology and other partners beyond 25/26.","startDate":"2022-04-01","endDate":"2033-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 30/03/2033 to 31/03/2033. This is primarily due to the following factors‚ This a 10 year change programme to deliver digital transformation of all the national screening programmes. Following the Programme Business Case (PBC) approval in July 2023, lengthy commercial approval processes meant the mobilisation of the strategic delivery partner/supplier did not start until early 2024 and was only fully mobilised in June 2024.","fyBaseline":25.0,"fyForecast":24.8,"fyVariance":0.8,"varianceNarrative":"The budget variance is less than or equal to 5%. The budget variance was 0.8% within the 5% variance. The budget was reduced mid-year to £19m, then there was a late allocation of additional capital. Despite this the budget variance at the end of the financial year was less than 1%.","wholeLifeCost":106.69,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 113 to 106. This is primarily due to the following factors‚ The programme Baseline Whole Life Cost is currently 108.69 (£m). The forecast cost is £250.69.The forecast expenditure is aligned with the spending review, February 2025, to include costs up until 2028/29. This a bid only, however this won't be known until the funding allocation for the next spending review period is confirmed. The funding up until 25/26 is confirmed.","benefits":15808.5,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 610 to 15808. This is primarily due to the following factors‚ Benefits have been aligned to spending review submission, February 2025, which includes additional scope beyond the currently approved business case, which run to March 2026. Benefits include the full societal benefits of early treatment of additional cancers to be detected and productivity savings from moving to digital communications and other tools. Confidence adjustments applied to all benefits following NHSE Transformation Portfolio Office assurance of the Business Case Addendum December 2024.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from RED to AMBER. This is primarily due to the following factors‚ the programme having now commenced delivery with new digital products being developed, tested and scaled. There is work in progress to secure future funding…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 30/03/2033 to 31/03/2033. This is primarily due to the following factors‚ This a 10 year change programme to deliver digital transformation of all the national screening programmes. Following the Programme Business Case (PBC) approval in July 2023, lengthy commercial approval processes meant the mobilisation of the strategic delivery partner/supplier did not start until early 2024 and was only fully mobilised in June 2024.","narrativeClaimKind":null},{"id":"DHSC_0069_2021-Q4","year":2026,"name":"NHS Digital Transformation of Screening","department":"DHSC","category":"Government Transformation and Service Delivery","description":"NHS England is transforming the digital services that support the national screening programmes. This work replaces paper-based processes and outdated technology with modern digital services designed to be secure, reliable and easier to use. The new services help people better understand and manage their screening information, including their history and appointments, and support staff by automating manual processes, improving how screening services are managed and delivered. This transformation programme has designed and delivered shared digital services for screening programmes, alongside support for people who may need help accessing digital services and wider service improvements. The work also implements key recommendations from the 2019 independent review of screening led by Professor Sir Mike Richards. This phase of the programme closes at the end of March 2026.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The programme’s Delivery Confidence Assessment (DCA) rating remains Amber, reflecting the challenges associated with the scale and complexity of the transformation, while confirming that its objectives remain achievable. Since HM Treasury approval of the Programme Business Case in July 2023, the programme has made significant progress in modernising national screening services. Key milestones met include the introduction of digital communications for cervical and bowel screening programmes, and progress towards digital breast screening and human papillomavirus (HPV) self-testing. IPA/NISTA gateway reviews in 2025 and 2026 confirmed that delivery remains feasible. The programme is within budget and continues to progress toward its goals of improving screening safety and participation, modernising technology, and delivering more efficient, innovative services.","startDate":"2022-04-01","endDate":"2033-03-30","scheduleNarrative":"A Programme Business Case (PBC) Addendum extended spend approval to March 2026, to allow time for the full PBC refresh following the 2025 Spending Review. Delivery has progressed well, with new digital services for cervical, and bowel screening deployed, and services such as Manage Breast Screening. The programme is now transitioning to be part of the wider Transforming Patient, Public and Staff-facing Services programme from April 2026, which will retain existing organisational and governance arrangements to support continued delivery.","fyBaseline":33.8,"fyForecast":37.68,"fyVariance":11.46,"varianceNarrative":"£2.7m of in-year variance is driven by an accounting adjustment following reassessment of spend capitalised in prior years, resulting in an in-year Revenue charge. The remaining overspend of £1.3m equates to 3.7% and is within the optimism bias value of the case.","wholeLifeCost":94.5,"costNarrative":"The original WLC estimate set in the original 2023 PBC, with one off cost spend due to end March 29. This was updated in the PBC Addendum to a one off cost spend ending in Mar 26, which reduced the WLC. This reflects the decision to replace the DToS programme with a new, larger programme that included investment for screening alongside other areas of investment.","benefits":3767.13,"benefitsNarrative":"Compared to financial year 24/25-Q4, the programme's departmental benefits estimate at 25/26-Q4 has decreased . The main drivers for the change in benefits estimation for the programme are: - Changes to the treatment of QUALY benefits, figures have been updated with 25/26 actuals and onward forecasting aligned with the wider Transforming Patient, Public and Staff-facing Services programme business case.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Technical & integration"],"evidenceExcerpt":"The programme’s Delivery Confidence Assessment (DCA) rating remains Amber, reflecting the challenges associated with the scale and complexity of the transformation, while confirming that its objectives remain achievable. Since HM Treasury approval of the Programme Business Case in July 2023, the programme has made significant progress in modernising…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"A Programme Business Case (PBC) Addendum extended spend approval to March 2026, to allow time for the full PBC refresh following the 2025 Spending Review. Delivery has progressed well, with new digital services for cervical, and bowel screening deployed, and services such as Manage Breast Screening. The programme is now transitioning to be part of the wider Transforming Patient, Public and Staff-facing Services programme from April 2026, which will retain existing organisational and governance arrangements to support continued delivery.","narrativeClaimKind":null}],"previous":{"id":"DHSC_0069_2021-Q4","year":2025,"name":"NHS Digital Transformation of Screening","department":"DHSC","category":"Government Transformation and Service Delivery","description":"The NHS Digital Transformation of Screening Programme (DToS), covers work required to design, develop and deliver new shared screening services and supporting digital products and assisted digital support, and the associated change delivery. Our vision aims to implement key recommendations in Professor Sir Mike Richards review which set out the need to improve IT systems to support the safe and effective delivery of screening services.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from RED to AMBER. This is primarily due to the following factors‚ the programme having now commenced delivery with new digital products being developed, tested and scaled. There is work in progress to secure future funding beyond 2025/6 and agree a commercial approach for technology and other partners beyond 25/26.","startDate":"2022-04-01","endDate":"2033-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 30/03/2033 to 31/03/2033. This is primarily due to the following factors‚ This a 10 year change programme to deliver digital transformation of all the national screening programmes. Following the Programme Business Case (PBC) approval in July 2023, lengthy commercial approval processes meant the mobilisation of the strategic delivery partner/supplier did not start until early 2024 and was only fully mobilised in June 2024.","fyBaseline":25.0,"fyForecast":24.8,"fyVariance":0.8,"varianceNarrative":"The budget variance is less than or equal to 5%. The budget variance was 0.8% within the 5% variance. The budget was reduced mid-year to £19m, then there was a late allocation of additional capital. Despite this the budget variance at the end of the financial year was less than 1%.","wholeLifeCost":106.69,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 113 to 106. This is primarily due to the following factors‚ The programme Baseline Whole Life Cost is currently 108.69 (£m). The forecast cost is £250.69.The forecast expenditure is aligned with the spending review, February 2025, to include costs up until 2028/29. This a bid only, however this won't be known until the funding allocation for the next spending review period is confirmed. The funding up until 25/26 is confirmed.","benefits":15808.5,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 610 to 15808. This is primarily due to the following factors‚ Benefits have been aligned to spending review submission, February 2025, which includes additional scope beyond the currently approved business case, which run to March 2026. Benefits include the full societal benefits of early treatment of additional cancers to be detected and productivity savings from moving to digital communications and other tools. Confidence adjustments applied to all benefits following NHSE Transformation Portfolio Office assurance of the Business Case Addendum December 2024.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from RED to AMBER. This is primarily due to the following factors‚ the programme having now commenced delivery with new digital products being developed, tested and scaled. There is work in progress to secure future funding…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 30/03/2033 to 31/03/2033. This is primarily due to the following factors‚ This a 10 year change programme to deliver digital transformation of all the national screening programmes. Following the Programme Business Case (PBC) approval in July 2023, lengthy commercial approval processes meant the mobilisation of the strategic delivery partner/supplier did not start until early 2024 and was only fully mobilised in June 2024.","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":-1,"attentionScore":22,"attentionReasons":["Current published delivery confidence is Amber","In-year forecast variance is +11.5%"]},{"id":"DWP_0029_2021-Q4","year":2026,"name":"PENSIONS DASHBOARD PROGRAMME","department":"DWP","category":"Information and Communications Technology (ICT)","description":"The Pensions Dashboards Programme (PDP) is being delivered by the Money and Pensions Service (MaPS). PDP is an enabling programme, delivering the central digital architecture, standards and governance arrangements necessary for the dashboards ecosystem to operate. The pensions dashboards service will enable individuals to access their pensions information online, securely and all in one place, thereby supporting better planning for retirement and growing financial wellbeing. Dashboards will provide clear and simple information about an individual's multiple pension savings, including their State Pension. They will also help them to reconnect with any lost pensions.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25, the NISTA/SRO Delivery Confidence Assessment rating at 25/26-Q4 remained at AMBER. This is primarily due to the following factors: The Amber rating reflects the delivery confidence assessment and findings of the most recent NISTA review held in March 2026, which noted the excellent progress made to date and found no blockers to delivery. Over the past twelve months we have made significant progress with onboarding pension schemes and providers to the central digital architecture with over 1,000 now connected, which represents over 60 million records or three quarters of those within scope; and are supporting MaPS colleagues with consumer testing for the MoneyHelper Pensions Dashboard, the first dashboard that will be made available, to demonstrate that the end-to-end service meets users' needs. In parallel, we are working with the regulators, DWP and other potential dashboard providers to develop the process and standards necessary to support other dashboards in the future. We are also putting in place transition arrangements, embedding the necessary governance arrangements, practices and procedures to manage Programme closedown and for the central digital architecture to operate as a business as usual activity.","startDate":"2019-04-01","endDate":"2027-03-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same and is scheduled to be 31/03/2027. This is primarily due to the following factors‚ the Programme is on track to deliver its objectives by the scheduled end date of March 2027. Good progress made with the connection of pension schemes and providers to the ecosystem, citizen testing well advanced, and solid progress with the arrangements for transition and Programme closedown.","fyBaseline":34.29,"fyForecast":30.45,"fyVariance":11.19,"varianceNarrative":"The budget variance exceeds 5%. FY 2025/26 in-year spend of £30.63m (real values) as of Q4 reporting was c£4m lower than £34.49m (real values) Departmental Baseline, resulting in variance of 11%. This was driven by the delivery of additional change work identified during programme reset. This increase in costs within the financial year was approved by the Department in October 2025.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Exempt under Section 35 - Formulation of government policy","themes":["Delivery & schedule","Cost & funding","Technical & integration","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25, the NISTA/SRO Delivery Confidence Assessment rating at 25/26-Q4 remained at AMBER. This is primarily due to the following factors: The Amber rating reflects the delivery confidence assessment and findings of the most recent NISTA review held in March 2026, which noted the excellent progress made to date and found no…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same and is scheduled to be 31/03/2027. This is primarily due to the following factors‚ the Programme is on track to deliver its objectives by the scheduled end date of March 2027. Good progress made with the connection of pension schemes and providers to the ecosystem, citizen testing well advanced, and solid progress with the arrangements for transition and Programme closedown.","narrativeClaimKind":null,"history":[{"id":"DWP_0029_2021-Q4","year":2021,"name":"Pensions Dashboard Programme","department":"DWP","category":"ICT","description":"Pensions dashboards will enable individuals to access their pensions information online, securely and all in one place, thereby supporting better planning for retirement and growing financial wellbeing. Dashboards will provide clear and simple information about an individual's multiple pension savings, including their State Pension. They will also help them to reconnect with any lost pots. The Pensions Dashboards Programme has been established to design and implement the infrastructure that will make pensions dashboards work, and the governance framework to support its operation.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber.This is primarily due to the following factors: The Amber rating reflects the balance of progress made to date and the levels of risk being carried. We have successfully delivered the first iteration of data standards, significant progress to commencing two large procurement exercises and supported DWP in the passing of the Pensions Schemes Act 2021, all significant milestones. We recognise the complexities involved in designing and delivering a service that will work for consumers whilst minimising the burden on the industry. We are working with our public sector and industry delivery partners to continuously improve our working practices, to identify dependencies and manage risks. Successful stakeholder communications channels and engagement strategies will be critical to meeting these challenges over the year ahead.","startDate":"2019-04-01","endDate":"2025-03-31","scheduleNarrative":"The project end-date is 31 March 2025. This is primarily due to the following factors: Programme planning assumptions remain consistent with those contained in our Programme Update Report, published on the Pensions Dashboard Programme website in October 2020. This shows the Programme moving from set-up and planning to the development stage this year, in preparation for testing and voluntary onboarding next year. The two procurement exercises we are conducting this summer are critical to our timeline. Both remain on course and we are closely monitoring their progress at monthly Board meetings. Programme plans are reviewed each month by the Board. We remain on track to begin onboarding schemes from 2022 with dashboards available from 2023. A transition plan for steady state will start next year with Programme closedown scheduled for March 2025.","fyBaseline":4.66,"fyForecast":4.66,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"","themes":["Delivery & schedule","Commercial & supply chain","Technical & integration","Cost & funding"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber.This is primarily due to the following factors: The Amber rating reflects the balance of progress made to date and the levels of risk being carried. We have successfully delivered the first iteration of data standards, significant progress to commencing two large…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project end-date is 31 March 2025. This is primarily due to the following factors: Programme planning assumptions remain consistent with those contained in our Programme Update Report, published on the Pensions Dashboard Programme website in October 2020. This shows the Programme moving from set-up and planning to the development stage this year, in preparation for testing and voluntary onboarding next year. The two procurement exercises we are conducting this summer are critical to our timeline. Both remain on course and we are closely monitoring their progress at monthly Board meetings. Programme plans are reviewed each month by the Board. We remain on track to begin onboarding schemes from 2022 with dashboards available from 2023. A transition plan for steady state will start next year with Programme closedown scheduled for March 2025.","narrativeClaimKind":null},{"id":"DWP_0029_2021-Q4","year":2022,"name":"Pensions Dashboard Programme","department":"DWP","category":"ICT","description":"Pensions dashboards will enable individuals to access their pensions information online, securely and all in one place, thereby supporting better planning for retirement and growing financial wellbeing. Dashboards will provide clear and simple information about an individual's multiple pension savings, including their State Pension. They will also help them to reconnect with any lost pots. The Pensions Dashboards Programme has been established to design and implement the infrastructure that will make dashboards work, and the governance framework to support its operation.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 20/21-Q4, the Delivery Confidence Assessment rating at 21/22-Q4 remained at Amber Since July 2021 significant progress has been made. Procurement of a technology partner was completed in September and the programme completed a three month discovery/setup phase which ended in December. The core technology for dashboards is due to be delivered in May 2022 and this is on track. The Programme has completed the procurement of an identity supplier and they have been successfully integrated with the core technology. Work is being undertaken to develop a set of standards which will provide clarity to all the participants in the service, and ensure it best meets the needs of the consumer. The amber rating reflects the complex delivery environment, in which there are several large organisations participating, including government, regulators and the pensions and financial services industry. A key challenge is the readiness of the pensions industry to join the service when compulsory onboarding is expected to begin in 2023.","startDate":"2019-04-01","endDate":"2025-03-31","scheduleNarrative":"Compared to 2021-Q4, your project end-date remained scheduled to finish on 31 MAR 2025. This is primarily due to the following factors: The programme continues to meet its high-level published milestones which sees testing with invited participants in September 2022. Following this the service will see the steady addition of both pension providers and users. When the service achieves a sufficient level of coverage, it will be made live (known as the dashboards available point). The legislation that compels pension providers to join the service and provide their data will be laid when parliamentary time allows, following publication of the Government's response to its consultation in the summer. The first cohorts of schemes should commence onboarding from April 2023. The service cannot launch before this point. During this time a transition plan will be developed that will set out how the dashboards will become a business as usual operation in 2025 once the programme closes down.","fyBaseline":7.92,"fyForecast":17.09,"fyVariance":116.0,"varianceNarrative":"The budget variance exceeds 5%. The budget variance for FY 21/22 is driven by the outcome from a procurement for technology services which resulted in a reprofile of spend as the costs, although cheaper overall than budgeted, were front-end loaded to enable the programme to deliver more quickly. The budget variance has been met through re-prioritisation of existing budgets.","wholeLifeCost":93.0,"costNarrative":"Compared to 2021-Q4,the projects Baseline Whole Life Cost remained at 93.08 (£m). This is primarily due to the following factors: Whole life costs have remained consistent with the assumptions contained in the programme SOBC, approved in 2020. PDP have now completed two major procurements which broadly fixes costs enabling the programme to remain on budget. This should continue on the basis that the other delivery assumptions remain constant across the programme lifecycle.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Technical & integration","Commercial & supply chain","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Delivery Confidence Assessment rating at 21/22-Q4 remained at Amber Since July 2021 significant progress has been made. Procurement of a technology partner was completed in September and the programme completed a three month discovery/setup phase which ended in December. The core technology for dashboards is due to…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to 2021-Q4, your project end-date remained scheduled to finish on 31 MAR 2025. This is primarily due to the following factors: The programme continues to meet its high-level published milestones which sees testing with invited participants in September 2022. Following this the service will see the steady addition of both pension providers and users. When the service achieves a sufficient level of coverage, it will be made live (known as the dashboards available point). The legislation that compels pension providers to join the service and provide their data will be laid when parliamentary time allows, following publication of the Government's response to its consultation in the summer. The first cohorts of schemes should commence onboarding from April 2023. The service cannot launch before this point. During this time a transition plan will be developed that will set out how the dashboards will become a business as usual operation in 2025 once the programme closes down.","narrativeClaimKind":null},{"id":"DWP_0029_2021-Q4","year":2023,"name":"Pensions Dashboard Programme","department":"DWP","category":"ICT","description":"Pensions dashboards will enable individuals to access their pensions information online, securely and all in one place, thereby supporting better planning for retirement and growing financial wellbeing. Dashboards will provide clear and simple information about an individual's multiple pension savings, including their State Pension. They will also help them to reconnect with any lost pots.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 decreased from Amber (SRO rating) to Red (IPA rating). This is primarily due to the following factors. In March 2023 the Department for Work and Pensions (DWP) announced via a Written Ministerial Statement (WMS) that there would be changes to the mandatory connection deadlines for pension providers and schemes. The statement explained that the Pensions Dashboards Programme (PDP) was unable to meet the connection deadlines set out in legislation.PDP is working closely with DWP who have appointed a dedicated Reset Director with experience in large change programmes to oversee the reset, working alongside the existing PDP team. The reset team will:. assess the programme;. revise the plan; and. mobilise for delivery.DWP published a further WMS in June 2023 outlining that regulations have been put before Parliament to replace the previous staging timeline with a single mandatory connection deadline. This will be complemented by guidance which will set out when schemes will be expected to connect. The connection deadline set out in law by DWP will be 31 October 2026.","startDate":null,"endDate":null,"scheduleNarrative":"Early planning GMPP project (The project has not yet passed SOC, or its programme equivalent)","fyBaseline":19.86,"fyForecast":19.2,"fyVariance":-3.0,"varianceNarrative":"N/A as variance is below 5%","wholeLifeCost":null,"costNarrative":"Early planning GMPP project (The project has not yet passed SOC, or its programme equivalent)","benefits":null,"benefitsNarrative":"Early planning GMPP project (The project has not yet passed SOC, or its programme equivalent)","themes":["Scope & requirements","Delivery & schedule","Cost & funding","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 decreased from Amber (SRO rating) to Red (IPA rating). This is primarily due to the following factors. In March 2023 the Department for Work and Pensions (DWP) announced via a Written Ministerial Statement (WMS) that there would be changes to the mandatory connection…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Early planning GMPP project (The project has not yet passed SOC, or its programme equivalent)","narrativeClaimKind":null},{"id":"DWP_0029_2021-Q4","year":2024,"name":"Pensions Dashboard Programme","department":"DWP","category":"ICT","description":"Pensions dashboards will enable individuals to access their pensions information online, securely and all in one place, thereby supporting better planning for retirement and growing financial wellbeing. Dashboards will provide clear and simple information about an individual's multiple pension savings, including their State Pension. They will also help them to reconnect with any lost pots.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. This has since been confirmed by an IPA assessment in mid-April 2024, that reviewed Programme delivery confidence against the recommendations made in the two assurance reviews from early 2023. The Amber rating reflects the progress made over the year in a number of key areas including: - delivering a revised baselined delivery plan - strengthening the senior leadership including the appointment of a full-time SRO - improved ways of working with the supplier - more effective governance arrangements - significant progress made against previous assurance review recommendations - progress made in addressing capability gaps These measures have placed the Programme back on a viable footing and equipped it to meet the new single deadline in legislation of October 2026. There remain a number of risks to delivery that are being actively managed and tracked by the Programme Board.","startDate":null,"endDate":null,"scheduleNarrative":"ARMP adjustments - Project not yet in a position to give cost/schedule","fyBaseline":18.61,"fyForecast":15.88,"fyVariance":-15.0,"varianceNarrative":"The budget variance exceeds 5%. In-year spend total for FY 2023/24 has reduced by 2.7m from baseline of 18.61m to the revised forecast of 15.88m. The variance is largely driven by reprofiled activities from current to future years following reset.","wholeLifeCost":null,"costNarrative":"ARMP adjustments - Project not yet in a position to give cost/schedule","benefits":null,"benefitsNarrative":"ARMP adjustments - Project not yet in a position to give cost/schedule","themes":["Delivery & schedule","Governance & assurance","Cost & funding","Commercial & supply chain"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. This has since been confirmed by an IPA assessment in mid-April 2024, that reviewed Programme delivery confidence against the recommendations made in the two assurance reviews from early 2023. The Amber rating…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"ARMP adjustments - Project not yet in a position to give cost/schedule","narrativeClaimKind":null},{"id":"DWP_0029_2021-Q4","year":2025,"name":"PENSIONS DASHBOARD PROGRAMME","department":"DWP","category":"ICT","description":"The Pensions Dashboards Programme (PDP) is being delivered by the Money and Pensions Service (MaPS). Pensions dashboards will enable individuals to access their pensions information online, securely and all in one place, thereby supporting better planning for retirement and growing financial wellbeing. Dashboards will provide clear and simple information about an individual's multiple pension savings, including their State Pension. They will also help them to reconnect with any lost pensions.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The SRO's amber rating aligns with the rating provided by the recent IPA assurance review, and reflects the good progress made with delivery since the programme exited reset last year. A number of key milestones have been delivered including HMT approval of the revised programme business case; the successful connection of our pathfinder organisations to the central digital architecture; continued good progress with the connection of our voluntary participants; and we are on track to commence citizen testing of the end-to-end service in summer 2025. The programme operates within a particularly complex delivery landscape, and there are a number of critical dependencies and risks that are being actively managed and tracked by the Programme Board.","startDate":"2019-04-01","endDate":"2027-03-31","scheduleNarrative":"The project's end-date at 24/25-Q4 is scheduled to be 31/03/2027. This is primarily due to the following factors‚ The programme is on track to deliver to its scheduled end date of March 2027. All pension schemes and providers have now been given dates in guidance by when they should connect to the dashboards ecosystem, and a legal deadline of 30 October 2026 by when they must.","fyBaseline":26.1,"fyForecast":28.1,"fyVariance":7.66,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The in-year spend for FY 2024/25 was £2m higher than the baseline forecast, a variance of 8%. This was driven by the delivery of additional change work identified during programme reset.","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":0.0,"benefitsNarrative":"The project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) is 0. This is primarily due to the following factors‚ Programme benefits will accrue from the point of launch of the service. The launch date has yet to be decided.","themes":["Delivery & schedule","Governance & assurance","Cost & funding","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The SRO's amber rating aligns with the rating provided by the recent IPA assurance review, and reflects the good progress made with delivery since the programme…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 24/25-Q4 is scheduled to be 31/03/2027. This is primarily due to the following factors‚ The programme is on track to deliver to its scheduled end date of March 2027. All pension schemes and providers have now been given dates in guidance by when they should connect to the dashboards ecosystem, and a legal deadline of 30 October 2026 by when they must.","narrativeClaimKind":null},{"id":"DWP_0029_2021-Q4","year":2026,"name":"PENSIONS DASHBOARD PROGRAMME","department":"DWP","category":"Information and Communications Technology (ICT)","description":"The Pensions Dashboards Programme (PDP) is being delivered by the Money and Pensions Service (MaPS). PDP is an enabling programme, delivering the central digital architecture, standards and governance arrangements necessary for the dashboards ecosystem to operate. The pensions dashboards service will enable individuals to access their pensions information online, securely and all in one place, thereby supporting better planning for retirement and growing financial wellbeing. Dashboards will provide clear and simple information about an individual's multiple pension savings, including their State Pension. They will also help them to reconnect with any lost pensions.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25, the NISTA/SRO Delivery Confidence Assessment rating at 25/26-Q4 remained at AMBER. This is primarily due to the following factors: The Amber rating reflects the delivery confidence assessment and findings of the most recent NISTA review held in March 2026, which noted the excellent progress made to date and found no blockers to delivery. Over the past twelve months we have made significant progress with onboarding pension schemes and providers to the central digital architecture with over 1,000 now connected, which represents over 60 million records or three quarters of those within scope; and are supporting MaPS colleagues with consumer testing for the MoneyHelper Pensions Dashboard, the first dashboard that will be made available, to demonstrate that the end-to-end service meets users' needs. In parallel, we are working with the regulators, DWP and other potential dashboard providers to develop the process and standards necessary to support other dashboards in the future. We are also putting in place transition arrangements, embedding the necessary governance arrangements, practices and procedures to manage Programme closedown and for the central digital architecture to operate as a business as usual activity.","startDate":"2019-04-01","endDate":"2027-03-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same and is scheduled to be 31/03/2027. This is primarily due to the following factors‚ the Programme is on track to deliver its objectives by the scheduled end date of March 2027. Good progress made with the connection of pension schemes and providers to the ecosystem, citizen testing well advanced, and solid progress with the arrangements for transition and Programme closedown.","fyBaseline":34.29,"fyForecast":30.45,"fyVariance":11.19,"varianceNarrative":"The budget variance exceeds 5%. FY 2025/26 in-year spend of £30.63m (real values) as of Q4 reporting was c£4m lower than £34.49m (real values) Departmental Baseline, resulting in variance of 11%. This was driven by the delivery of additional change work identified during programme reset. This increase in costs within the financial year was approved by the Department in October 2025.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Exempt under Section 35 - Formulation of government policy","themes":["Delivery & schedule","Cost & funding","Technical & integration","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25, the NISTA/SRO Delivery Confidence Assessment rating at 25/26-Q4 remained at AMBER. This is primarily due to the following factors: The Amber rating reflects the delivery confidence assessment and findings of the most recent NISTA review held in March 2026, which noted the excellent progress made to date and found no…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same and is scheduled to be 31/03/2027. This is primarily due to the following factors‚ the Programme is on track to deliver its objectives by the scheduled end date of March 2027. Good progress made with the connection of pension schemes and providers to the ecosystem, citizen testing well advanced, and solid progress with the arrangements for transition and Programme closedown.","narrativeClaimKind":null}],"previous":{"id":"DWP_0029_2021-Q4","year":2025,"name":"PENSIONS DASHBOARD PROGRAMME","department":"DWP","category":"ICT","description":"The Pensions Dashboards Programme (PDP) is being delivered by the Money and Pensions Service (MaPS). Pensions dashboards will enable individuals to access their pensions information online, securely and all in one place, thereby supporting better planning for retirement and growing financial wellbeing. Dashboards will provide clear and simple information about an individual's multiple pension savings, including their State Pension. They will also help them to reconnect with any lost pensions.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The SRO's amber rating aligns with the rating provided by the recent IPA assurance review, and reflects the good progress made with delivery since the programme exited reset last year. A number of key milestones have been delivered including HMT approval of the revised programme business case; the successful connection of our pathfinder organisations to the central digital architecture; continued good progress with the connection of our voluntary participants; and we are on track to commence citizen testing of the end-to-end service in summer 2025. The programme operates within a particularly complex delivery landscape, and there are a number of critical dependencies and risks that are being actively managed and tracked by the Programme Board.","startDate":"2019-04-01","endDate":"2027-03-31","scheduleNarrative":"The project's end-date at 24/25-Q4 is scheduled to be 31/03/2027. This is primarily due to the following factors‚ The programme is on track to deliver to its scheduled end date of March 2027. All pension schemes and providers have now been given dates in guidance by when they should connect to the dashboards ecosystem, and a legal deadline of 30 October 2026 by when they must.","fyBaseline":26.1,"fyForecast":28.1,"fyVariance":7.66,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The in-year spend for FY 2024/25 was £2m higher than the baseline forecast, a variance of 8%. This was driven by the delivery of additional change work identified during programme reset.","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":0.0,"benefitsNarrative":"The project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) is 0. This is primarily due to the following factors‚ Programme benefits will accrue from the point of launch of the service. The launch date has yet to be decided.","themes":["Delivery & schedule","Governance & assurance","Cost & funding","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The SRO's amber rating aligns with the rating provided by the recent IPA assurance review, and reflects the good progress made with delivery since the programme…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 24/25-Q4 is scheduled to be 31/03/2027. This is primarily due to the following factors‚ The programme is on track to deliver to its scheduled end date of March 2027. All pension schemes and providers have now been given dates in guidance by when they should connect to the dashboards ecosystem, and a legal deadline of 30 October 2026 by when they must.","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":0,"attentionScore":22,"attentionReasons":["Current published delivery confidence is Amber","In-year forecast variance is +11.2%"]},{"id":"DWP_0217_2223-Q4","year":2026,"name":"SERVICE MODERNISATION PROGRAMME","department":"DWP","category":"Government Transformation and Service Delivery","description":"The Service Modernisation Programme (SMP) is transforming services for over 20 million DWP customers, improving how we serve people across society, including children within separated families, people in later life, and individuals with health conditions or disabilities including those looking to progress into work and customers overseas. By transforming how we deliver DWP services, we can significantly improve customer experience and make it easier for frontline colleagues to support those who need us the most. To achieve our transformation aims we have a three-pronged ambition: Digital services with a human touch Embracing new technology, and improving the ways people can contact us Joined-up services, designed around the customer Simplified access, to improve positive customer experience Services that don’t stand still Improved data use helping us to detect and respond to fraud, error, and customer experience barriers","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25-Q4 the programme’s end-date at 25/26-Q4 remained on schedule. This is due to the following factors: Over the past 12 months the Programme has continued to deliver to plan with 8 major milestones delivered, transforming services for our customers and colleagues. A programme of this size, scale and complexity does occasionally result in some variance in key deliverables. Where this has happened, variance has been managed with no tolerance breaches during the financial year. The Programme’s financial benefit position remains healthy. The latest data available demonstrates the Programme is on track to deliver our financial savings forecasts. Our benefits position has been revised upwards. The Programme's non-financial benefits remain healthy with positive feedback from our customers and our colleagues. We continue to embed new ways of working, and changing our culture, which will be further accelerated this coming financial year. We remain mindful of the associated risks and complexities in this area.","startDate":"2022-04-01","endDate":"2033-03-31","scheduleNarrative":"Funding for PBC2 has been approved until end of June 2026. We are currently preparing an updated Business Case and commenced engagement with HMT around obtaining funding until 28/29. Conversations have been very constructive, and we are confident of achieving the levels of funding required for continued Programme delivery. (with the exception of Child Maintenance Service’s Policy Reform implementation, where funding is limited to discovery work whilst required legislative decisions remain outstanding.)","fyBaseline":80.91,"fyForecast":70.23,"fyVariance":13.19,"varianceNarrative":"The budget variance exceeds -13% (-£11m). This is primarily due to the following reason: Slippage in new SR investment opportunities funded in PBC2 Refresh, that started in 2025/6 (£10.6m). The largest drivers within the opportunities are Care/Business Delivery Model equating to £3.23m and the online Customer Account (Get proof of your benefits and state pension) equating to £6.23m, which both had reprofiling of resources during the year.","wholeLifeCost":1150.0,"costNarrative":"SMP’s departmentally agreed Real Terms Costs at 25/26-Q4 (measured in £m) are £1,150m (rounded to nearest £m). This is primarily due to the following factors: A new iteration of the Programme Business Case (PBC2 Refresh) was approved by HMT that considers: - Spending Review opportunities - an increase of £340m. - A prioritisation exercise, focussing on initiatives that deliver the core objectives of Service Modernisation - a reduction of £68m. - Adding back Service Modernisation baseline Business As Usual staff - an increase of £77m - Updating sunk costs - an increase of £1m.","benefits":2111.0,"benefitsNarrative":"SMP's agreed baseline Real Terms financial benefits (measured in £m) are £2,111m (rounded to the nearest £m). This is driven by: 1. Inclusion of Spending Review (SR) Opportunities within the business case following HMT approval. The Spending Review opportunities include increased benefits for the Programme, due in the main to the inclusion of the following: a) Business Delivery Model - including the Customer Account b) Child Maintenance Policy changes c) Inclusion of Bereavement for the Programme. 2. Activity within Children's Services that has brought additional improvements such as Channel Shift, some re-organisation activity and Continuous Improvement activity. 3. Increases in workload volumes and salary cost increases.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25-Q4 the programme’s end-date at 25/26-Q4 remained on schedule. This is due to the following factors: Over the past 12 months the Programme has continued to deliver to plan with 8 major milestones delivered, transforming services for our customers and colleagues. A programme of this size, scale and complexity does occasionally…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Funding for PBC2 has been approved until end of June 2026. We are currently preparing an updated Business Case and commenced engagement with HMT around obtaining funding until 28/29. Conversations have been very constructive, and we are confident of achieving the levels of funding required for continued Programme delivery. (with the exception of Child Maintenance Service’s Policy Reform implementation, where funding is limited to discovery work whilst required legislative decisions remain outstanding.)","narrativeClaimKind":null,"history":[{"id":"DWP_0217_2223-Q4","year":2024,"name":"Service Modernisation Programme","department":"DWP","category":"Government Transformation and Service Delivery","description":"The Service Modernisation Programme (SMP) is a bold, cross-cutting transformation programme that supports DWP's policy and delivery aims by: . modernising key products making them digital with a human touch . joining up our services based on customer need, and . creating services that don't stand still by investing in our colleagues to unlock a culture of continuous transformation. By modernising in this way we will deliver better, cost effective services that our customers can rely on. Over 20 million customers rely on our services every day, at some of the most difficult and important times. The Programme will transform 11 service areas end to end whilst implementing improvements across DWP to common service areas such as telephony. Using this work we will create a future design for how we deliver services, bringing organisational change and digital transformation to create modern services fit for the future.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. The Infrastructure Project Authority (IPA) Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to: 1) SMP's ambitious programme can only be confirmed as GREEN as it nears the end of its overarching delivery plan. 2) The rating reflects the medium to longer term outlook for the Programme success against its Programme Business Case (PBC) due to its complexities and dependencies on the wider operating environment. 3) SMP is progressing well and there are good indications that the PBC benefits can be delivered. We agree with the IPA commentary on the Programme Delivery Confidence Assessment. The Programme continues to manage the risks arising from the dependencies around the wider operating environment. These risks are managed in line with government risk management methodology. Successful implementation will enable DWP to operate in a streamlined, optimised, more efficient and effective manner, supported by a culture of continuous improvement and incremental change. Legacy IT systems can be decommissioned once replaced with new Digital systems","startDate":"2022-04-01","endDate":"2033-03-31","scheduleNarrative":"The project's end-date at 23/24-Q4 is 2033-03-31. This is primarily due to the following factors. Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained on schedule. This is due to the following factors: Over the past 12 months the Programme has delivered to plan and remains on track to realise the benefits documented in its business case. Where there has been some slight variance in key deliverables, the variance has been actively managed and there have been no tolerance breaches to report during financial year 23/24. Our Programme of cultural change across the organisation continues and whilst progressing well we are mindful of the associated risks and complexities in this area. PBC2 for 24/25 funding is due for HMT approval in May 2024. The Programme will then seek further funding for the next SR period to allow us to continue our modernisation aspirations and delivery of further benefits.","fyBaseline":98.76,"fyForecast":107.4,"fyVariance":9.0,"varianceNarrative":"Since the PBC was signed off SMP have transferred costs that were funded elsewhere within the Department to the programme. This is the cause of the variance between Baseline and Forecast._x000D_ _x000D_ The transferred costs include staff costs previously funded via the department's baseline and Digital staff that are deployed on the programme are now recharged. _x000D_ _x000D_ Budgets were transferred into the programme to match this spend._x000D_ _x000D_ During the financial year an additional 17.3m RDEL in 24/25 relating to additional productivity funding was agreed with HMT, which has been allocated to SMP","wholeLifeCost":449.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 23/24-Q4 is 449m. This is primarily due to the following factors. The budgeted whole life costs remain the same at 448.7m, as what was approved in May 2023 for the Programmes Business Case.","benefits":1026.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 1026m.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Technical & integration"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. The Infrastructure Project Authority (IPA) Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to: 1) SMP's ambitious programme can only be confirmed as GREEN as it nears the end of…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 23/24-Q4 is 2033-03-31. This is primarily due to the following factors. Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained on schedule. This is due to the following factors: Over the past 12 months the Programme has delivered to plan and remains on track to realise the benefits documented in its business case. Where there has been some slight variance in key deliverables, the variance has been actively managed and there have been no tolerance breaches to report during financial year 23/24. Our Programme of cultural change across the organisation continues and whilst progressing well we are mindful of the associated risks and complexities in this area. PBC2 for 24/25 funding is due for HMT approval in May 2024. The Programme will then seek further funding for the next SR period to allow us to continue our modernisation aspirations and delivery of further benefits.","narrativeClaimKind":null},{"id":"DWP_0217_2223-Q4","year":2025,"name":"SERVICE MODERNISATION PROGRAMME","department":"DWP","category":"Government Transformation and Service Delivery","description":"The Service Modernisation Programme (SMP) is a bold, cross-cutting transformation programme that supports DWP’s policy and delivery aims by: • Modernising key products making them digital with a human touch • Joining up our services based on customer need, and • Creating services that don’t stand still by investing in our colleagues to unlock a culture of continuous transformation. By modernising in this way we will deliver better, cost effective services that our customers can rely on. Over 20 million customers rely on our services every day, at some of the most difficult and important times. The Programme will transform 11 service areas end to end whilst implementing improvements across DWP to common service areas such as telephony. Using this work we will create a future design for how we deliver services, bringing organisational change and digital transformation to create modern services fit for the future.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The Infrastructure Project Authority (IPA) Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. 1) SMP’s highly ambitious and long-term transformational programme can only be confirmed as GREEN as it nears the end of its overarching delivery cycle. 2) There are 10 recommendations, the majority of these have been addressed, with work progressing well on the remaining actions. IPA Report that successful delivery of the programme/project to time, cost and quality appears feasible but significant issues already exist requiring management attention. These appear resolvable at this stage and, if addressed promptly, should not present a cost/schedule overrun. We accepted the Review Team's recommendations in full and a number of the recommendations have already been delivered we are confident that recommendations will be address for the next IPA assessment The next IPA assessment is due to commence in July.","startDate":"2022-04-01","endDate":null,"scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2033. This is primarily due to the following factors‚ Compared to financial year 23/24-Q4 the project's end-date at 24/25-Q4 remained on schedule. This is due to the following factors: Over the past 12 months the Programme has continued to deliver to plan with 17 major milestones delivered, transforming services for our customers and colleagues. A Programme of this size, scale and complexity does occasionally result in some variance in key deliverables. Where this has happened, variance has been managed with no tolerance breaches to report. The Programme’s financial benefit position remains healthy. The latest data available demonstrates the Programme is on track to deliver our financial savings forecasts. Our benefits position has been revised upwards. The Programme's non-financial benefits remain healthy with positive feedback from our customers and our colleagues. We continue to embed new ways of working, and changing our culture, which will be further accelerated this coming financial year. We remain mindful of the associated risks and complexities in this area. Funding for PBC2 has been approved until end of September 2025, and an updated version of PBC2 will be shared with HMT shortly to secure spending for the remainder of 25/26. We have already commenced engagement with HMT around funding discussions for the next SR period.","fyBaseline":88.36,"fyForecast":95.62,"fyVariance":8.22,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ Since the PBC was signed off SMP have transferred costs that were funded elsewhere within the Department to the programme. This is the cause of the variance between Baseline and Forecast. The transferred costs include staff costs previously funded via the department’s baseline and Digital staff that are deployed on the programme are now recharged. Budgets were transferred into the programme to match this spend. During the financial year an additional £17.3m RDEL in 24/25 relating to additional productivity funding was agreed with HMT, which has been allocated to SMP","wholeLifeCost":763.61,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 449 to 763. This is primarily due to the following factors‚ The budgeted whole life costs remain the same at £763.6m, as what was approved in May 2023 for the Programmes Business Case.","benefits":1184.12,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 1026 to 1184. This is primarily due to the following factors‚ SMP’s agreed baseline financial benefits are £1,184m. At Q4 our forecasted financial benefits have increased from £1,330m to circa £1,432m (c8%). This is driven by the updated workload forecasts from Spring 2023 (used in PBC2) to Winter 2024, leading to greater modernisation savings as fewer members of staff are required. For the full PBC period (22/23 to 32/33), SMP are on track to deliver the financial savings forecasts.","themes":["Cost & funding","Delivery & schedule","Technical & integration","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The Infrastructure Project Authority (IPA) Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. 1) SMP’s highly…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2033. This is primarily due to the following factors‚ Compared to financial year 23/24-Q4 the project's end-date at 24/25-Q4 remained on schedule. This is due to the following factors: Over the past 12 months the Programme has continued to deliver to plan with 17 major milestones delivered, transforming services for our customers and colleagues. A Programme of this size, scale and complexity does occasionally result in some variance in key deliverables. Where this has happened, variance has been managed with no tolerance breaches to report. The Programme’s financial benefit position remains healthy. The latest data available demonstrates the Programme is on track to deliver our financial savings forecasts. Our benefits position has been revised upwards. The Programme's non-financial benefits remain healthy with positive feedback from our customers and our colleagues. We continue to embed new ways of working, and changing our culture, which will be further accelerated this coming financial year. We remain mindful of the associated risks and complexities in this area. Funding for PBC2 has been approved until end of September 2025, and an updated version of PBC2 will be shared with HMT shortly to secure spending for the remainder of 25/26. We have already commenced engagement with HMT around funding discussions for the next SR period.","narrativeClaimKind":null},{"id":"DWP_0217_2223-Q4","year":2026,"name":"SERVICE MODERNISATION PROGRAMME","department":"DWP","category":"Government Transformation and Service Delivery","description":"The Service Modernisation Programme (SMP) is transforming services for over 20 million DWP customers, improving how we serve people across society, including children within separated families, people in later life, and individuals with health conditions or disabilities including those looking to progress into work and customers overseas. By transforming how we deliver DWP services, we can significantly improve customer experience and make it easier for frontline colleagues to support those who need us the most. To achieve our transformation aims we have a three-pronged ambition: Digital services with a human touch Embracing new technology, and improving the ways people can contact us Joined-up services, designed around the customer Simplified access, to improve positive customer experience Services that don’t stand still Improved data use helping us to detect and respond to fraud, error, and customer experience barriers","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25-Q4 the programme’s end-date at 25/26-Q4 remained on schedule. This is due to the following factors: Over the past 12 months the Programme has continued to deliver to plan with 8 major milestones delivered, transforming services for our customers and colleagues. A programme of this size, scale and complexity does occasionally result in some variance in key deliverables. Where this has happened, variance has been managed with no tolerance breaches during the financial year. The Programme’s financial benefit position remains healthy. The latest data available demonstrates the Programme is on track to deliver our financial savings forecasts. Our benefits position has been revised upwards. The Programme's non-financial benefits remain healthy with positive feedback from our customers and our colleagues. We continue to embed new ways of working, and changing our culture, which will be further accelerated this coming financial year. We remain mindful of the associated risks and complexities in this area.","startDate":"2022-04-01","endDate":"2033-03-31","scheduleNarrative":"Funding for PBC2 has been approved until end of June 2026. We are currently preparing an updated Business Case and commenced engagement with HMT around obtaining funding until 28/29. Conversations have been very constructive, and we are confident of achieving the levels of funding required for continued Programme delivery. (with the exception of Child Maintenance Service’s Policy Reform implementation, where funding is limited to discovery work whilst required legislative decisions remain outstanding.)","fyBaseline":80.91,"fyForecast":70.23,"fyVariance":13.19,"varianceNarrative":"The budget variance exceeds -13% (-£11m). This is primarily due to the following reason: Slippage in new SR investment opportunities funded in PBC2 Refresh, that started in 2025/6 (£10.6m). The largest drivers within the opportunities are Care/Business Delivery Model equating to £3.23m and the online Customer Account (Get proof of your benefits and state pension) equating to £6.23m, which both had reprofiling of resources during the year.","wholeLifeCost":1150.0,"costNarrative":"SMP’s departmentally agreed Real Terms Costs at 25/26-Q4 (measured in £m) are £1,150m (rounded to nearest £m). This is primarily due to the following factors: A new iteration of the Programme Business Case (PBC2 Refresh) was approved by HMT that considers: - Spending Review opportunities - an increase of £340m. - A prioritisation exercise, focussing on initiatives that deliver the core objectives of Service Modernisation - a reduction of £68m. - Adding back Service Modernisation baseline Business As Usual staff - an increase of £77m - Updating sunk costs - an increase of £1m.","benefits":2111.0,"benefitsNarrative":"SMP's agreed baseline Real Terms financial benefits (measured in £m) are £2,111m (rounded to the nearest £m). This is driven by: 1. Inclusion of Spending Review (SR) Opportunities within the business case following HMT approval. The Spending Review opportunities include increased benefits for the Programme, due in the main to the inclusion of the following: a) Business Delivery Model - including the Customer Account b) Child Maintenance Policy changes c) Inclusion of Bereavement for the Programme. 2. Activity within Children's Services that has brought additional improvements such as Channel Shift, some re-organisation activity and Continuous Improvement activity. 3. Increases in workload volumes and salary cost increases.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25-Q4 the programme’s end-date at 25/26-Q4 remained on schedule. This is due to the following factors: Over the past 12 months the Programme has continued to deliver to plan with 8 major milestones delivered, transforming services for our customers and colleagues. A programme of this size, scale and complexity does occasionally…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Funding for PBC2 has been approved until end of June 2026. We are currently preparing an updated Business Case and commenced engagement with HMT around obtaining funding until 28/29. Conversations have been very constructive, and we are confident of achieving the levels of funding required for continued Programme delivery. (with the exception of Child Maintenance Service’s Policy Reform implementation, where funding is limited to discovery work whilst required legislative decisions remain outstanding.)","narrativeClaimKind":null}],"previous":{"id":"DWP_0217_2223-Q4","year":2025,"name":"SERVICE MODERNISATION PROGRAMME","department":"DWP","category":"Government Transformation and Service Delivery","description":"The Service Modernisation Programme (SMP) is a bold, cross-cutting transformation programme that supports DWP’s policy and delivery aims by: • Modernising key products making them digital with a human touch • Joining up our services based on customer need, and • Creating services that don’t stand still by investing in our colleagues to unlock a culture of continuous transformation. By modernising in this way we will deliver better, cost effective services that our customers can rely on. Over 20 million customers rely on our services every day, at some of the most difficult and important times. The Programme will transform 11 service areas end to end whilst implementing improvements across DWP to common service areas such as telephony. Using this work we will create a future design for how we deliver services, bringing organisational change and digital transformation to create modern services fit for the future.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The Infrastructure Project Authority (IPA) Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. 1) SMP’s highly ambitious and long-term transformational programme can only be confirmed as GREEN as it nears the end of its overarching delivery cycle. 2) There are 10 recommendations, the majority of these have been addressed, with work progressing well on the remaining actions. IPA Report that successful delivery of the programme/project to time, cost and quality appears feasible but significant issues already exist requiring management attention. These appear resolvable at this stage and, if addressed promptly, should not present a cost/schedule overrun. We accepted the Review Team's recommendations in full and a number of the recommendations have already been delivered we are confident that recommendations will be address for the next IPA assessment The next IPA assessment is due to commence in July.","startDate":"2022-04-01","endDate":null,"scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2033. This is primarily due to the following factors‚ Compared to financial year 23/24-Q4 the project's end-date at 24/25-Q4 remained on schedule. This is due to the following factors: Over the past 12 months the Programme has continued to deliver to plan with 17 major milestones delivered, transforming services for our customers and colleagues. A Programme of this size, scale and complexity does occasionally result in some variance in key deliverables. Where this has happened, variance has been managed with no tolerance breaches to report. The Programme’s financial benefit position remains healthy. The latest data available demonstrates the Programme is on track to deliver our financial savings forecasts. Our benefits position has been revised upwards. The Programme's non-financial benefits remain healthy with positive feedback from our customers and our colleagues. We continue to embed new ways of working, and changing our culture, which will be further accelerated this coming financial year. We remain mindful of the associated risks and complexities in this area. Funding for PBC2 has been approved until end of September 2025, and an updated version of PBC2 will be shared with HMT shortly to secure spending for the remainder of 25/26. We have already commenced engagement with HMT around funding discussions for the next SR period.","fyBaseline":88.36,"fyForecast":95.62,"fyVariance":8.22,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ Since the PBC was signed off SMP have transferred costs that were funded elsewhere within the Department to the programme. This is the cause of the variance between Baseline and Forecast. The transferred costs include staff costs previously funded via the department’s baseline and Digital staff that are deployed on the programme are now recharged. Budgets were transferred into the programme to match this spend. During the financial year an additional £17.3m RDEL in 24/25 relating to additional productivity funding was agreed with HMT, which has been allocated to SMP","wholeLifeCost":763.61,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 449 to 763. This is primarily due to the following factors‚ The budgeted whole life costs remain the same at £763.6m, as what was approved in May 2023 for the Programmes Business Case.","benefits":1184.12,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 1026 to 1184. This is primarily due to the following factors‚ SMP’s agreed baseline financial benefits are £1,184m. At Q4 our forecasted financial benefits have increased from £1,330m to circa £1,432m (c8%). This is driven by the updated workload forecasts from Spring 2023 (used in PBC2) to Winter 2024, leading to greater modernisation savings as fewer members of staff are required. For the full PBC period (22/23 to 32/33), SMP are on track to deliver the financial savings forecasts.","themes":["Cost & funding","Delivery & schedule","Technical & integration","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The Infrastructure Project Authority (IPA) Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. 1) SMP’s highly…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2033. This is primarily due to the following factors‚ Compared to financial year 23/24-Q4 the project's end-date at 24/25-Q4 remained on schedule. This is due to the following factors: Over the past 12 months the Programme has continued to deliver to plan with 17 major milestones delivered, transforming services for our customers and colleagues. A Programme of this size, scale and complexity does occasionally result in some variance in key deliverables. Where this has happened, variance has been managed with no tolerance breaches to report. The Programme’s financial benefit position remains healthy. The latest data available demonstrates the Programme is on track to deliver our financial savings forecasts. Our benefits position has been revised upwards. The Programme's non-financial benefits remain healthy with positive feedback from our customers and our colleagues. We continue to embed new ways of working, and changing our culture, which will be further accelerated this coming financial year. We remain mindful of the associated risks and complexities in this area. Funding for PBC2 has been approved until end of September 2025, and an updated version of PBC2 will be shared with HMT shortly to secure spending for the remainder of 25/26. We have already commenced engagement with HMT around funding discussions for the next SR period.","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":null,"attentionScore":22,"attentionReasons":["Current published delivery confidence is Amber","In-year forecast variance is +13.2%"]},{"id":"DWP_0042_2122-Q3","year":2026,"name":"SYNERGY PROGRAMME","department":"DWP","category":"Government Transformation and Service Delivery","description":"Synergy Programme is a collaboration between the Department for Environment, Food & Rural Affairs (DEFRA), Department for Work and Pensions (DWP), Home Office (HO) and Ministry of Justice (MOJ) to achieve the Government’s Shared Services Strategy by transforming shared services to make them smarter, swifter and more streamlined. Synergy is a business transformation programme to replace the current services provided by Shared Services Connected Limited (SSCL) to those four departments and their. Arms Length Bodies (ALBS). It focusses on simplifying and aligning processes, data systems, and services, to transform our users’ experiences and drive interoperability between departments, resulting in increased productivity and value for money. Synergy will transform the business-critical services (people, finance, commercial) for the four departments. It will be delivered through shared capabilities and technology as a platform for innovation, automation, and improved customer experience. The four departments support more than 250 000 civil and public servants who deliver some of the most vital and high-risk public services in our country. Synergy will make it easier for our people to do their job and deliver efficiencies that free up resources to focus on public outcomes.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 increased to AMBER. This is primarily due to the following factors: - Delivery of structured Roadmap to Amber addressing NISTA recommendations - Demonstrable progress against NISTA critical findings (planning, governance, readiness) - Strengthened operating model, roles and cross-department working - Improved dependency, contract, and integrated delivery management - Increased planning maturity and clarity of delivery approach - Sustained improvement trajectory confirmed through Stage Gate 3 assurance","startDate":"2021-04-01","endDate":"2029-01-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 increased from December 2028 to January 2029. The shift from December 2028 to January reflects the re-baselined delivery plan which extended the common design phase and adjusted the release strategy and sequencing. This resulted in a small, controlled extension to accommodate a more robust and deliverable implementation profile.","fyBaseline":152.95,"fyForecast":144.99,"fyVariance":5.21,"varianceNarrative":"The core programme outturn was within 5% of the ringfenced budget the overall variance exceeds 5% due to additional spend in partner departments being below the previous estimate following movement of costs into future years.","wholeLifeCost":1990.99,"costNarrative":"The projects departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) was £1990.99m. This is primarily due to updated numbers and reassessment undertaken in the move to full business case 2 from full business case 1.","benefits":734.07,"benefitsNarrative":"The benefits are £734.07m over the 10 year business case period. Benefits were re-baselined in 25/26 for FBC2 and the landscape of the programme hasn't changed enough since 25/26 to re-baseline as the BPS provider is still onboarding. Work is ongoing to identify further benefits, particularly with the BPS and the Hub.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 increased to AMBER. This is primarily due to the following factors: - Delivery of structured Roadmap to Amber addressing NISTA recommendations - Demonstrable progress against NISTA critical findings (planning, governance, readiness) - Strengthened…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 increased from December 2028 to January 2029. The shift from December 2028 to January reflects the re-baselined delivery plan which extended the common design phase and adjusted the release strategy and sequencing. This resulted in a small, controlled extension to accommodate a more robust and deliverable implementation profile.","narrativeClaimKind":null,"history":[{"id":"DWP_0042_2122-Q3","year":2023,"name":"Synergy Programme","department":"DWP","category":"Government Transformation and Service Delivery","description":"The Department for Environment, Food and Rural Affairs (DEFRA), Department for Work and Pensions, Home Office (HO) and Ministry of Justice (MOJ) are collaborating together in a cluster to achieve the Government's Shared Services Strategy by transforming shared services to make them smarter, swifter and more streamlined. Synergy is a business transformation programme to replace the current services provided by Shared Services Connected Limited (SSCL) and focusing simplifying and aligning processes, data systems and services, to transform our users' experiences and drive interoperability between departments, resulting in increased productivity and value for money, provided through a single Software as a Service (SaaS) Enterprise Resource Planning (ERP) platform and business process service. The four departments have committed to working as a single cluster with departments responsible for their departmental transformations.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 is Amber. This is primarily due to the following factors. The Synergy programme agrees with the IPA commentary on the Programme Delivery Confidence Assessment. The programme continues to manage the significant risks arising from the complexity and scale of change required. Risk management remains embedded across the programme, managed by dedicated programme risk resources and reviewed at the monthly Programme Board. Successful implementation will enable and utilise the full potential of cloud technology to drive further efficiencies, savings and better user experience. The magnitude of change required in each Department cannot be underestimated and will require strengthened programme transformation leadership and capability (which we are actively shaping) and cross Government support at all levels in order to deliver step changes in effectiveness of shared services across those Departments.","startDate":"2021-04-01","endDate":"2028-12-29","scheduleNarrative":"The project's end-date at 22/23-Q4 is 2028-12-29. This is primarily due to the following factors. The Programme has completed a planning refresh and was baselined by the Synergy Strategic Programme Board at the end of April. This planning refresh has brought a greater understanding and added more detail of the activities needed to design and procure technology, delivery partners and also change ways of working that will meet our user experience and benefits ambition and enable this to be presented in a compelling Full Business Case. Delivery dates have been updated accordingly.","fyBaseline":20.0,"fyForecast":15.15,"fyVariance":-24.0,"varianceNarrative":"In Financial year 22/23 Synergy expenditure (15m), was below the 20m drawdown. This is largely due to timing of expenditure on staffing and consultancy in departments. In March 2023, HMT agreed flexibility to allow the carry forward of the anticipated underspend in 23/24 (It is proposed to share an initial view of this with HMT) to support the Full Business Case approval into Q1 of financial year 24/25, through a date only extension. The Programme is strengthening its financial management, linking closely with department teams to develop a resourced integrated plan. This will underpin managing expenditure in 2023/24.","wholeLifeCost":2488.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 22/23-Q4 is 2488m. This is primarily due to the following factors. The programme has agreed funding for the current Spending Review period to 2024. However this is a cross department programme which extends beyond the current Spending Review period. Projected funding for the next Spending Review period will need to be agreed with HMT so that the programme can deliver its scope and benefits.","benefits":1089.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 1089m. Benefits are being matured, through asking Department functional directors to identify connected and end to end strategic opportunities, alongside maturing the already identified benefits as the design develops. We are ensuring our work helps shape and align to the cross-Government benefits work.","themes":["Cost & funding","Approvals & decisions","Governance & assurance","Delivery & schedule"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 is Amber. This is primarily due to the following factors. The Synergy programme agrees with the IPA commentary on the Programme Delivery Confidence Assessment. The programme continues to manage the significant risks arising from the complexity and scale of change…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 22/23-Q4 is 2028-12-29. This is primarily due to the following factors. The Programme has completed a planning refresh and was baselined by the Synergy Strategic Programme Board at the end of April. This planning refresh has brought a greater understanding and added more detail of the activities needed to design and procure technology, delivery partners and also change ways of working that will meet our user experience and benefits ambition and enable this to be presented in a compelling Full Business Case. Delivery dates have been updated accordingly.","narrativeClaimKind":null},{"id":"DWP_0042_2122-Q3","year":2024,"name":"Synergy Programme","department":"DWP","category":"Government Transformation and Service Delivery","description":"The Department for Environment, Food and Rural Affairs (DEFRA), Department for Work and Pensions, Home Office (HO) and Ministry of Justice (MOJ) are collaborating together in a cluster to achieve the Government's Shared Services Strategy by transforming shared services to make them smarter, swifter and more streamlined. Synergy is a business transformation programme to replace the current services provided by Shared Services Connected Limited (SSCL) and focusing simplifying and aligning processes, data systems and services, to transform our users' experiences and drive interoperability between departments, resulting in increased productivity and value for money, provided through a single Software as a Service (SaaS) Enterprise Resource Planning (ERP) platform and business process service. The four departments have committed to working as a single cluster with departments responsible for their departmental transformations.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. The Delivery confidence for Syngery remains Amber, reflecting the significant challenge involved in delivering a business transformation change programme to circa 220,000 civil servants across the Department for Work and Pensions, the Ministry of Justice, the Home Office and the Department for Food, Environment and Rural Affairs. IPA Gate 3 review is due in June 2024 and the Programme will respond to any recommendations arising from that and are currently responding to recommendations from GIAA to strenghten the Programme governance which will be key as we move into the delivery stage of the Programme.","startDate":"2021-04-01","endDate":"2028-12-29","scheduleNarrative":"The project's end-date at 23/24-Q4 is 2028-12-29. This is primarily due to the following factors. The Synergy Programme Full Business Case is on track for HMT approval by July 2024 with SI/ERP procurement on track for contract award once FBC approval is in place. BPS ITT is now been prepared ready for publication.","fyBaseline":55.0,"fyForecast":39.8,"fyVariance":-28.0,"varianceNarrative":"In Financial year 23/24 Synergy expenditure (39.8m), was below the 65m drawdown. This is largely due to timing of expenditure on staffing and consultancy in departments. HMT agreed flexibility to allow the carry forward of 17.6m of the anticipated underspend in 23/24 to support the Full Business Case approval into Q1 of financial year 24/25, through a date only extension._x000D_ The Programme is strengthening its financial management through a resource integrated plan and greater understanding of the cost elements making up the full business case. This will underpin managing expenditure in 2024/25.","wholeLifeCost":2488.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 remained at 2488m. This is primarily due to the following factors. The programme extends beyond the SR period (2024) that it is funded for. Further funding for the next SR period will need to be agreed with HMT for this cross department transformation programme","benefits":1089.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 1089m.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Commercial & supply chain"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. The Delivery confidence for Syngery remains Amber, reflecting the significant challenge involved in delivering a business transformation change programme to circa 220,000 civil servants across the Department for…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 23/24-Q4 is 2028-12-29. This is primarily due to the following factors. The Synergy Programme Full Business Case is on track for HMT approval by July 2024 with SI/ERP procurement on track for contract award once FBC approval is in place. BPS ITT is now been prepared ready for publication.","narrativeClaimKind":null},{"id":"DWP_0042_2122-Q3","year":2025,"name":"SYNERGY PROGRAMME","department":"DWP","category":"Government Transformation and Service Delivery","description":"The Department for Environment, Food & Rural Affairs (DEFRA), Department for Work and Pensions (DWP), Home Office (HO) and Ministry of Justice (MOJ) are collaborating together in a cluster to achieve the Government’s Shared Services Strategy by transforming shared services to make them smarter, swifter and more streamlined. Synergy is a business transformation programme to replace the current services provided by Shared Services Connected Limited (SSCL). It focusses on simplifying and aligning processes, data systems and services, to transform our users’ experiences and drive interoperability between departments, resulting in increased productivity and value for money, provided through a single Software as a Service (SaaS) Enterprise Resource Planning (ERP) platform and business process service. The four departments have committed to working as a single cluster with departments responsible for their departmental transformations. Every year the Government spends around £525m on shared services. This provides business critical services like HR, finance, payroll and procurement for around 500,000 civil servants, 230,000 military personnel and reservists, and one million veterans. It makes around 15 million financial transactions at a value of £278bn. So far 286 siloed departmental based systems have been discovered and the majority are approaching end of life, are increasingly expensive to maintain and cyber vulnerable. They need to be replaced. In 2021, it was estimated a direct cost of £1.7- £2 billion (2020 prices) to replace shared service systems individually by department, delivering approximately 10% annual savings. The Government strategy is estimated to realise double those annual cashable savings as well as over £2bn of additional efficiencies and productivity benefits by bringing departments together to form clusters to transform shared services. Synergy is one of the clusters formed as part of this initiative. We are a cross-departmental programme developing and implementing this shared services transformation across: DWP, Defra, Home Office, and MoJ. These departments support more than a quarter of a million officials and public servants who deliver some of the most vital and high-risk public services in our country. Working as a ‘cluster’ gets the best results, allows for better data sharing, better decision-making, and simpler processes. Joint decisions allow us to put users and the collective benefit first. Synergy will transform the business-critical services (people, finance, commercial) for the four departments. It will be delivered through shared capabilities and technology as a platform for innovation, automation and improved customer experience. It will make it easier for our people to do their job and deliver efficiencies that free up resources to focus on public outcomes. ​","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 decreased from AMBER to RED. This is primarily due to the following factors‚ This was due to feedback from stakeholders raising concerns with the previous SRO about losing confidence in the Programme's leadership, unclear roles and responsibilities and ways of working in the Programme and the lack of a coherent integrated Programme plan. On the Q2 GMPP report for 2024/25 the then SRO assessed the Programme as Red. Subsequently 2 further Infrastructure and Projects Authority (IPA) reviews have taken place, the first was an assurance review as a response to the red assessment (December 24) followed by a Gate 0 review to assure progress was being made and that the Programme was on track. Although the review delivery confidence remained as Red, the report acknowledge the significant work that has taken place and that the Programme is on the right trajectory. It stated that all the recommendations from December had been addressed but there had not been enough time for the changes to have worked through into live running. An Assurance of Action Plan review is being planned for late July early August 2025.","startDate":"2021-04-01","endDate":"2028-12-29","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 29/12/2028. This is primarily due to the following factors‚ As of 31 March 2025 the Programme was still working to an end of Programme date of 29 December 2028. However we currently working through a change request which will move the Programme’s end date into early 2029 and once approved though governance it will be reported to GMPP accordingly.","fyBaseline":104.49,"fyForecast":83.11,"fyVariance":20.46,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ Delivery plans and final costs have been refined from the estimates made at Outline Business Case leading to an underspend in 2024/25","wholeLifeCost":2450.59,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 2488 to 2450. This is primarily due to the following factors‚ The total forecast for this programme between FY2021/22 and FY2036/37 is £2337.23m vs £2450.59m baseline which represents the financial case of the full business case in nominal terms. To arrive at these figures, we assessed the financial costs over both a 10- and 15-year period and compared the total and incremental costs of options against a funding baseline position. The baseline, shown in the the full business case is assumed to include all recurrent costs incurred by the departments for existing ERP technology and the BPS provider. The move to full business case from outline business case has reduced the baseline from £2487.74m to £2450.59m","benefits":776.12,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) decreased from 1089 to 776. This is primarily due to the following factors, Baseline numbers were refreshed to reflect movement in the functional HR/Finance/Commercial teams impacted by the Programme. Optimism Bias was reviewed and in some cases increased, to reflect the lack of design maturity and confidence against the process benefits. The position is being recovered and improved for 25/26 and FBC2 with current modelling demonstrating a c£44m p.a. improvement.","themes":["Cost & funding","Governance & assurance","Approvals & decisions","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 decreased from AMBER to RED. This is primarily due to the following factors‚ This was due to feedback from stakeholders raising concerns with the previous SRO about losing confidence in the Programme's leadership, unclear roles and…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 29/12/2028. This is primarily due to the following factors‚ As of 31 March 2025 the Programme was still working to an end of Programme date of 29 December 2028. However we currently working through a change request which will move the Programme’s end date into early 2029 and once approved though governance it will be reported to GMPP accordingly.","narrativeClaimKind":null},{"id":"DWP_0042_2122-Q3","year":2026,"name":"SYNERGY PROGRAMME","department":"DWP","category":"Government Transformation and Service Delivery","description":"Synergy Programme is a collaboration between the Department for Environment, Food & Rural Affairs (DEFRA), Department for Work and Pensions (DWP), Home Office (HO) and Ministry of Justice (MOJ) to achieve the Government’s Shared Services Strategy by transforming shared services to make them smarter, swifter and more streamlined. Synergy is a business transformation programme to replace the current services provided by Shared Services Connected Limited (SSCL) to those four departments and their. Arms Length Bodies (ALBS). It focusses on simplifying and aligning processes, data systems, and services, to transform our users’ experiences and drive interoperability between departments, resulting in increased productivity and value for money. Synergy will transform the business-critical services (people, finance, commercial) for the four departments. It will be delivered through shared capabilities and technology as a platform for innovation, automation, and improved customer experience. The four departments support more than 250 000 civil and public servants who deliver some of the most vital and high-risk public services in our country. Synergy will make it easier for our people to do their job and deliver efficiencies that free up resources to focus on public outcomes.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 increased to AMBER. This is primarily due to the following factors: - Delivery of structured Roadmap to Amber addressing NISTA recommendations - Demonstrable progress against NISTA critical findings (planning, governance, readiness) - Strengthened operating model, roles and cross-department working - Improved dependency, contract, and integrated delivery management - Increased planning maturity and clarity of delivery approach - Sustained improvement trajectory confirmed through Stage Gate 3 assurance","startDate":"2021-04-01","endDate":"2029-01-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 increased from December 2028 to January 2029. The shift from December 2028 to January reflects the re-baselined delivery plan which extended the common design phase and adjusted the release strategy and sequencing. This resulted in a small, controlled extension to accommodate a more robust and deliverable implementation profile.","fyBaseline":152.95,"fyForecast":144.99,"fyVariance":5.21,"varianceNarrative":"The core programme outturn was within 5% of the ringfenced budget the overall variance exceeds 5% due to additional spend in partner departments being below the previous estimate following movement of costs into future years.","wholeLifeCost":1990.99,"costNarrative":"The projects departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) was £1990.99m. This is primarily due to updated numbers and reassessment undertaken in the move to full business case 2 from full business case 1.","benefits":734.07,"benefitsNarrative":"The benefits are £734.07m over the 10 year business case period. Benefits were re-baselined in 25/26 for FBC2 and the landscape of the programme hasn't changed enough since 25/26 to re-baseline as the BPS provider is still onboarding. Work is ongoing to identify further benefits, particularly with the BPS and the Hub.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 increased to AMBER. This is primarily due to the following factors: - Delivery of structured Roadmap to Amber addressing NISTA recommendations - Demonstrable progress against NISTA critical findings (planning, governance, readiness) - Strengthened…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 increased from December 2028 to January 2029. The shift from December 2028 to January reflects the re-baselined delivery plan which extended the common design phase and adjusted the release strategy and sequencing. This resulted in a small, controlled extension to accommodate a more robust and deliverable implementation profile.","narrativeClaimKind":null}],"previous":{"id":"DWP_0042_2122-Q3","year":2025,"name":"SYNERGY PROGRAMME","department":"DWP","category":"Government Transformation and Service Delivery","description":"The Department for Environment, Food & Rural Affairs (DEFRA), Department for Work and Pensions (DWP), Home Office (HO) and Ministry of Justice (MOJ) are collaborating together in a cluster to achieve the Government’s Shared Services Strategy by transforming shared services to make them smarter, swifter and more streamlined. Synergy is a business transformation programme to replace the current services provided by Shared Services Connected Limited (SSCL). It focusses on simplifying and aligning processes, data systems and services, to transform our users’ experiences and drive interoperability between departments, resulting in increased productivity and value for money, provided through a single Software as a Service (SaaS) Enterprise Resource Planning (ERP) platform and business process service. The four departments have committed to working as a single cluster with departments responsible for their departmental transformations. Every year the Government spends around £525m on shared services. This provides business critical services like HR, finance, payroll and procurement for around 500,000 civil servants, 230,000 military personnel and reservists, and one million veterans. It makes around 15 million financial transactions at a value of £278bn. So far 286 siloed departmental based systems have been discovered and the majority are approaching end of life, are increasingly expensive to maintain and cyber vulnerable. They need to be replaced. In 2021, it was estimated a direct cost of £1.7- £2 billion (2020 prices) to replace shared service systems individually by department, delivering approximately 10% annual savings. The Government strategy is estimated to realise double those annual cashable savings as well as over £2bn of additional efficiencies and productivity benefits by bringing departments together to form clusters to transform shared services. Synergy is one of the clusters formed as part of this initiative. We are a cross-departmental programme developing and implementing this shared services transformation across: DWP, Defra, Home Office, and MoJ. These departments support more than a quarter of a million officials and public servants who deliver some of the most vital and high-risk public services in our country. Working as a ‘cluster’ gets the best results, allows for better data sharing, better decision-making, and simpler processes. Joint decisions allow us to put users and the collective benefit first. Synergy will transform the business-critical services (people, finance, commercial) for the four departments. It will be delivered through shared capabilities and technology as a platform for innovation, automation and improved customer experience. It will make it easier for our people to do their job and deliver efficiencies that free up resources to focus on public outcomes. ​","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 decreased from AMBER to RED. This is primarily due to the following factors‚ This was due to feedback from stakeholders raising concerns with the previous SRO about losing confidence in the Programme's leadership, unclear roles and responsibilities and ways of working in the Programme and the lack of a coherent integrated Programme plan. On the Q2 GMPP report for 2024/25 the then SRO assessed the Programme as Red. Subsequently 2 further Infrastructure and Projects Authority (IPA) reviews have taken place, the first was an assurance review as a response to the red assessment (December 24) followed by a Gate 0 review to assure progress was being made and that the Programme was on track. Although the review delivery confidence remained as Red, the report acknowledge the significant work that has taken place and that the Programme is on the right trajectory. It stated that all the recommendations from December had been addressed but there had not been enough time for the changes to have worked through into live running. An Assurance of Action Plan review is being planned for late July early August 2025.","startDate":"2021-04-01","endDate":"2028-12-29","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 29/12/2028. This is primarily due to the following factors‚ As of 31 March 2025 the Programme was still working to an end of Programme date of 29 December 2028. However we currently working through a change request which will move the Programme’s end date into early 2029 and once approved though governance it will be reported to GMPP accordingly.","fyBaseline":104.49,"fyForecast":83.11,"fyVariance":20.46,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ Delivery plans and final costs have been refined from the estimates made at Outline Business Case leading to an underspend in 2024/25","wholeLifeCost":2450.59,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 2488 to 2450. This is primarily due to the following factors‚ The total forecast for this programme between FY2021/22 and FY2036/37 is £2337.23m vs £2450.59m baseline which represents the financial case of the full business case in nominal terms. To arrive at these figures, we assessed the financial costs over both a 10- and 15-year period and compared the total and incremental costs of options against a funding baseline position. The baseline, shown in the the full business case is assumed to include all recurrent costs incurred by the departments for existing ERP technology and the BPS provider. The move to full business case from outline business case has reduced the baseline from £2487.74m to £2450.59m","benefits":776.12,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) decreased from 1089 to 776. This is primarily due to the following factors, Baseline numbers were refreshed to reflect movement in the functional HR/Finance/Commercial teams impacted by the Programme. Optimism Bias was reviewed and in some cases increased, to reflect the lack of design maturity and confidence against the process benefits. The position is being recovered and improved for 25/26 and FBC2 with current modelling demonstrating a c£44m p.a. improvement.","themes":["Cost & funding","Governance & assurance","Approvals & decisions","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 decreased from AMBER to RED. This is primarily due to the following factors‚ This was due to feedback from stakeholders raising concerns with the previous SRO about losing confidence in the Programme's leadership, unclear roles and…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 29/12/2028. This is primarily due to the following factors‚ As of 31 March 2025 the Programme was still working to an end of Programme date of 29 December 2028. However we currently working through a change request which will move the Programme’s end date into early 2029 and once approved though governance it will be reported to GMPP accordingly.","narrativeClaimKind":null},"ratingDelta":-1,"transition":"Improved","endDateDeltaDays":33,"attentionScore":22,"attentionReasons":["Current published delivery confidence is Amber","Published end date moved 33 days later","In-year forecast variance is +5.2%"]},{"id":"DFE_0010_1819-Q1","year":2026,"name":"T-Levels","department":"DFE","category":"Government Transformation and Service Delivery","description":"T Levels are two-year technical qualifications for 16-19-year-olds, offering students practical and knowledge based learning at a school or college and on-the-job experience through an industry placement of at least 315 hours - approximately 45 days. T Levels are designed to increase the economic value of skills being supplied by the post-16 system, increasing take-up of high-quality qualifications to improve skills, key to supporting the government's opportunity and growth missions. The T Level programme aims to roll-out and support the growth of T Levels to achieve these missions and benefits.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Overall delivery confidence for 2025/26 is Amber. The programme continues to perform strongly on quality, with positive trends in participation, retention, attainment and industry placements, and independent assurance confirms clear benefits for learners and employers. Confidence has improved over the year through stable recruitment in line with forecasts, high completion of industry placements and continued ministerial support, including targeted funding to sustain delivery. The Amber rating reflects ongoing and largely structural challenges in scaling the programme to its agreed steady‑state ambition rather than a decline in performance. Key pressures include the pace required to grow participation, uneven provider and employer capacity to expand placements, and the planned introduction of a new V Level route, all of which could constrain growth despite strong outcomes. Our pathway to Green includes: steps taken to ensure T Levels are accessible by a wider range of students through updates to our delivery framework to improve the quality and availability of industry placements; making improvements to T Levels by streamlining content and reducing assessment to improve deliverability; and setting out the purpose and intent for T Levels alongside V Levels in the response to the Post-16 Level 3 and Below Pathways consultation. This will support the programme in maintaining incremental growth following the initial period of intense scale-up and ensuring T Levels remain an attractive option for students and providers.","startDate":"2016-10-25","endDate":"2028-09-01","scheduleNarrative":"The programme’s planned end date remains 01/09/2028. The programme remains on track to have delivered at least two cohorts on each of the T Levels introduced in scope of this programme by this date. All large (1080+) legacy qualifications in existing T Level areas (with the exception of Health and Social Care) will be defunded in 2027. At that point, T Levels will be the only large (1080+) qualification available for those subjects. Steady State, the point at which we expect student numbers to peak and level, changing only in response to demographic shifts, is expected to be academic year 29/30.","fyBaseline":196.89,"fyForecast":175.31,"fyVariance":10.96,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors: reclaim of the T Level capital funding Specialist Equipment Allocation (SEA), lower than anticipated final costs of the Employer Support Funds (ESF) for Health and Small or Medium Enterprises (SMEs) and Construction, and the closure of IfATE and transfer of some core functions to Skills England and then DfE resulting in some prior costs no longer being in scope of the T Level programme.","wholeLifeCost":2025.0,"costNarrative":"Compared to financial year 24/25-Q4, the programme’s departmentally agreed Whole Life Cost (measured in £m) increase from £1,653m to £1,856m. This reflects the 25/26 budget being agreed and added to the WLC.","benefits":null,"benefitsNarrative":"The T Levels Programme does not yet report on its monetised benefit as longitudinal earnings data has not yet become available. From next year the programme will be able to report on this.","themes":["Cost & funding","Delivery & schedule","Scope & requirements","Workforce & capability"],"evidenceExcerpt":"Overall delivery confidence for 2025/26 is Amber. The programme continues to perform strongly on quality, with positive trends in participation, retention, attainment and industry placements, and independent assurance confirms clear benefits for learners and employers. Confidence has improved over the year through stable recruitment in line with forecasts,…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The programme’s planned end date remains 01/09/2028. The programme remains on track to have delivered at least two cohorts on each of the T Levels introduced in scope of this programme by this date. All large (1080+) legacy qualifications in existing T Level areas (with the exception of Health and Social Care) will be defunded in 2027. At that point, T Levels will be the only large (1080+) qualification available for those subjects. Steady State, the point at which we expect student numbers to peak and level, changing only in response to demographic shifts, is expected to be academic year 29/30.","narrativeClaimKind":null,"history":[{"id":"DFE_0010_1819-Q1","year":2020,"name":"T Level Programme","department":"DfE","category":"Government Transformation and Service Delivery","description":"To manage the development and delivery of new T Level qualifications, closure and benefit realisation","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber/Red, which has not changed since last year�s Q2 1819 Amber/Red, due primarily to the following factors; - An assurance review by IPA in December 2019 also had an Amber/Red DCA. In this review, a major risk was identified to September 2020 roll-out that the Technical Qualification (TQ) would not be developed, agreed and available for first teaching in September. However, this has since been agreed and signed off in April 2020. - The long-term sustainability of the T Levels programme has major challenges, the most immediate of which is its position in the upcoming Spending Review. The T Levels unique value in the wider qualifications landscape needs to be clearly set out to address this. - The strategic landscape for T Levels is not considered to be stable. If T Levels are to be part of the journey from Level 2 to Level 4 and employment, there needs to be consistency of approach across the reform landscape. Since the Q2 1920 (30th September 2019) Amber/Red IPA DCA, the following non-project operating environment activities have impacted the original Q2 IPA DCA; - The Covid-19 outbreak has re-directed priorities and in some cases, staff, to urgent Covid-19 related work. However, we do not anticipate that this will impact the ability to deliver in September 2020 as staff continue to work at pace, re-prioritise work where necessary and seek appropriate steers from Ministers. - Cabinet Office/No 10 have restricted government comms during the Coronavirus outbreak, which has resulted in comms on T Levels being paused. This will impact our planned comms and engagement strategy, which is currently under review. Since the Q2 1920 (30th September 2019) Amber/Red IPA DCA, the following primary project actions have impacted the original Q2 IPA DCA; - The delay to the approval of the Technical Qualifications originally posed a distinct threat to the September 2020 launch. These have since been approved by IfATE and Ofqual and are ahead of first teaching in September, eliminating what was one of the most significant risks to delivery. - An assurance review by IPA in December 2019 stated that \"In short, the amber red confidence rating reflects the complexity and size of the challenges described above to the long term delivery. If the Review Team was assessing the confidence in the delivery of the September 2020 milestone, we would assess confidence as Amber. This reflects the good work the programme has undertaken in its contingency planning, stakeholder engagement and close working with the AOs � as well as significant progress shown with employer and providers.\"","startDate":"2016-10-25","endDate":"2023-09-30","scheduleNarrative":"The scheduled baseline project end date at Q2 1920 (30th September 2019) is 30/09/23, has not changed since last year's Q2 1819 date of 30/09/23, due primarily to the following factors; - We remain committed to the delivery of T Levels from September 2020 though the current Covid-19 circumstances bring additional challenges, particularly for providers and for employers who might offer industry placements. We will continue to provide all the support we can to our partners throughout this period. - We have spoken to a majority of the 50 2020 providers regarding T Level in September and will continue to monitor. Providers are positive overall, but it�s important to note that the full impact of the Covid 19 has yet to have full effect and this picture may shift in the coming weeks. - The delay to the approval of the Technical Qualifications originally posed a distinct threat to the September 2020 launch. These have since been approved by IfATE and Ofqual and are ahead of first teaching in September, eliminating what was one of the most significant risks to delivery","fyBaseline":105.6,"fyForecast":123.6,"fyVariance":17.0,"varianceNarrative":"The 19/20 in-year baseline / forecast variance at Q2 1920 (30th September 2019) of 17%, is due primarily to the following factors; - In September 2019, an updated Strategic Overarching Business Case (SOBC) was drafted and submitted to the DFE Investment Committee. During this process we worked with all the different teams delivering the T Level elements and conducted a full review of the budgets required. During this process it was identified the budgets in the original SOBC and GMPP report had changed as the scope and delivery on the work had been agreed. The budgets were updated to reflect the latest figures. Since the Q2 1920 (30th September 2019) 19/20 in-year baseline / forecast variance of 17%, the following non-project operating environment activities have impacted the original Q2 19/20 in-year baseline / forecast variance; - The Cabinet Office advised our communication campaign colleagues to turn off the social media advertising in March 20, due to COVID-19. This led to an underspend in Financial Year 19-20. Since the Q2 1920 (30th September 2019) 19/20 in-year baseline / forecast variance of 17%, the following primary project actions have impacted the original Q2 19/20 in-year variance; - The delay in agreeing the first TQ has meant some of the networking events were delayed into financial year 20-21. This has caused an underspend in Financial Year 19-20.","wholeLifeCost":155.6,"costNarrative":"The baseline Whole Life Cost at Q2 1920 (30th September 2019) is �155.60 m, has increased by �9.40 m since last year's Q2 1819 (�m) baseline Whole Life Cost of �146.20 m, due primarily to the following factors; - In September 2019, an updated Strategic Overarching Business Case (SOBC) was drafted and submitted to the DFE Investment Committee. During this process we worked with all the different teams delivering the T Level elements and conducted a full review of the budgets required. During this process it was identified the budgets in the original SOBC and GMPP report had changed as the scope and delivery on the work had been agreed. The budgets were updated to reflect the latest figures. - In 20-21, the Strategic Business Case will be drafted and submitted to the Investment Committee (depending on COVID-19 work). The budgets will be reviewed, budgets may change further as additional work is scoped and delivered. Since the Q2 1920 (30th September 2019) �155.60 m baseline Whole Life Cost, the following non-project operating environment activities have impacted the original baseline Q2 Whole Life Cost; - The Cabinet Office advised our communication campaign colleagues to turn off the social media advertising in March 20, due to COVID-19. This led to an underspend in Financial Year 19-20. This will continue into Financial Year 20-21. The way networking and awareness raising with providers will have to be reviewed as we can not hold face to face events as planned, this will cause underspends will emerge. - Due to COVID-19 we may not be able to engage the employers needed to deliver the industry placements and therefore will not be able to deliver the expected amount of T Levels in September 2020, leading to an underspend. Since the Q2 1920 (30th September 2019) �155.60 m baseline Whole Life Cost, the following primary project actions have impacted the original Q2 baseline Whole Life Cost; - Through the SOBC, all the elements of T Levels have been reviewed and fully scoped. This has increased the WLC but we have a more robust T Level programme and delivery options to ensure the work is delivered effectively.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Approvals & decisions"],"evidenceExcerpt":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber/Red, which has not changed since last year�s Q2 1819 Amber/Red, due primarily to the following factors; - An assurance review by IPA in December 2019 also had an Amber/Red DCA. In this review, a major risk was identified to September 2020 roll-out that the…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2020","sourceLabel":"IPA Annual Report 2019-20","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The scheduled baseline project end date at Q2 1920 (30th September 2019) is 30/09/23, has not changed since last year's Q2 1819 date of 30/09/23, due primarily to the following factors; - We remain committed to the delivery of T Levels from September 2020 though the current Covid-19 circumstances bring additional challenges, particularly for providers and for employers who might offer industry placements. We will continue to provide all the support we can to our partners throughout this period. - We have spoken to a majority of the 50 2020 providers regarding T Level in September and will continue to monitor. Providers are positive overall, but it�s important to note that the full impact of the Covid 19 has yet to have full effect and this picture may shift in the coming weeks. - The delay to the approval of the Technical Qualifications originally posed a distinct threat to the September 2020 launch. These have since been approved by IfATE and Ofqual and are ahead of first teaching in September, eliminating what was one of the most significant risks to delivery","narrativeClaimKind":null},{"id":"DFE_0010_1819-Q1","year":2021,"name":"T Level Programme","department":"DFE","category":"Government Transformation and Service Delivery","description":"To increase the economic value of skills being supplied by the post 16 system, increasing take-up of high quality qualifications to improve skills, increasing productivity and social mobility. To enable the sustainable delivery of new high quality T Levels for 16-19 year olds.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber/red. This is primarily due to the following factors: The IPA made seven recommendations to improve the project and programme management of the T Level delivery for larger successive waves. We have made significant progress in addressing all the recommendations and meet on a monthly basis with the IPA to keep them informed of the progress we are making. The Technical Education Reform Board are sighted at bi-monthly intervals, on the progress we are making. The Major Projects Team at DfE have also provided us with additional support to ensure we remain on track to deliver T Levels in future waves. We will be carrying out our own internal review of the progress made against the assurance of action plan in June 2021.","startDate":"2016-10-25","endDate":"2023-09-30","scheduleNarrative":"Compared to financial year 19/20-Q2, the project's end-date remained scheduled to finish on 30 September 2023 . This is primarily due to the following factors: The current schedule has no known deviations from the planned schedule. Lessons learned from Wave 1 roll out are in progress to support planning for future waves. Covid-19 introduced new levels of uncertainty and the team are monitoring the potential impact on launch in September 2021.","fyBaseline":259.61,"fyForecast":143.84,"fyVariance":-45.0,"varianceNarrative":"The budget variance exceeds 5%. We are forecasting an underspend against the 20-21 budget. This underspend has emerged primarily due to the impact of Covid on the programme throughout the year.","wholeLifeCost":1101.26,"costNarrative":"Compared to financial year 19/20-Q2, the projects Baseline Whole Life Cost increased from �155.60m to �1101.26m. This is primarily due to the following factors: Our current projected Whole Life Costs has been refined in the course additional planning through spending review. Covid has had a considerable impact in FY 20-21","benefits":null,"benefitsNarrative":"","themes":["Delivery & schedule","Cost & funding","Governance & assurance","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber/red. This is primarily due to the following factors: The IPA made seven recommendations to improve the project and programme management of the T Level delivery for larger successive waves. We have made significant progress in…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 19/20-Q2, the project's end-date remained scheduled to finish on 30 September 2023 . This is primarily due to the following factors: The current schedule has no known deviations from the planned schedule. Lessons learned from Wave 1 roll out are in progress to support planning for future waves. Covid-19 introduced new levels of uncertainty and the team are monitoring the potential impact on launch in September 2021.","narrativeClaimKind":null},{"id":"DFE_0010_1819-Q1","year":2022,"name":"T Level Programme","department":"DFE","category":"Government Transformation and Service Delivery","description":"The current IPA Delivery Confidence Assessment for T Level programme is AMBER, following the review in September 2021. The Government Internal Audit Authority followed with a deep dive audit of Industry Placements and Capital Funding its findings rated the programme as MODERATE. The actions underway to address the recommendations are to further develop the T Level employer engagement strategy to support the scaling of provision of Industry Placements. The team is also working closely with the Association of Colleges to provide the right level of support for providers and stakeholders in Waves 3 and 4. The T Level team has developed a benefits realisation strategy and continues planning and preparation to support the success of future Waves. For the 2021/22 Academic Year, we have 10 T Levels being offered across 102 providers of all types, we are monitoring delivery, including Wave 2 providers' ability to source the necessary industry placements.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 decreased from Amber/red to Amber","startDate":"2016-10-25","endDate":"2023-09-30","scheduleNarrative":"Compared to 2021-Q4, your project end-date remained scheduled to finish on 30 SEP 2023 . This is primarily due to the following factors: The change in date is a result of the updated Business Case reflecting changes to business as usual.","fyBaseline":295.9,"fyForecast":229.0,"fyVariance":-23.0,"varianceNarrative":"The budget variance exceeds 5%. N/A - within tolerance","wholeLifeCost":919.0,"costNarrative":"Compared to 2021-Q4, the projects Baseline Whole Life Cost decreased from 1101.26 (£m) to 918.52 (£m). This is primarily due to the following factors: The latest Programme Business Case of June 2021 anticipated whole life costs of £1,882.8m from 2019-20 to 2024-25. Our current budgeted whole life costs reflect: - actual spend from pre-2019 to 2020-21, - 2021-22 actual costs at P11 plus remaining forecast for FY, - 2022-23 to 2024-25 forecasted costs based on SR21, subject to annual business planning.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Approvals & decisions","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 decreased from Amber/red to Amber Compared to 2021-Q4, your project end-date remained scheduled to finish on 30 SEP 2023 . This is primarily due to the following factors: The change in date is a result of the updated Business Case…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to 2021-Q4, your project end-date remained scheduled to finish on 30 SEP 2023 . This is primarily due to the following factors: The change in date is a result of the updated Business Case reflecting changes to business as usual.","narrativeClaimKind":null},{"id":"DFE_0010_1819-Q1","year":2023,"name":"T Level Programme","department":"DFE","category":"Government Transformation and Service Delivery","description":"To increase the economic value of skills being supplied by the post 16 system, increasing take-up of high quality qualifications to improve skills, increasing productivity and social mobility. To enable the sustainable delivery of new high quality T Levels for 16-19 year olds.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 decreased from Amber to Red. This is primarily due to the following factors. The current IPA Delivery Confidence Assessment for T Level programme is red, following the Gate 0 review in February 2023. To address challenges to delivery, the February IPA review recommended that the programme's objectives be reviewed and refined and the programme re-baselined to refocus delivery on sustainable growth. The current viability of the programme is not in question and this reset is taking place alongside continued delivery for summer 2023. A review of the progress against the recommendations took place in June, and the programme has subsequently received an Amber rating at the Assurance of Action Plan. The review team noted \"The SRO and programme team are commended for the significant amount of work that has been undertaken by the programme team in a short space of time to address the (letter and the spirit of the) previous recommendations.\"","startDate":"2016-10-25","endDate":"2023-09-30","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2023-09-30. This is primarily due to the following factors. The change in date from 30 September 2023 to 30 September 2025 is a result of the updated Business Case, drafted in September 2021, reflecting changes to business as usual and a revised project end date of 30 September 2025.","fyBaseline":232.2,"fyForecast":248.2,"fyVariance":7.0,"varianceNarrative":"The budget variance exceeds 5%. The budget variance is mainly due to additional CDEL spend for T Levels Specialist Equipment Allocation (SEA) as agreed with HMT. This is partially offset by underspend on RDEL which mainly relates to - changes to Industry Placements Employer Support arrangements - revised forecasts from IfATE due to structural changes - refined delivery plans for Phase Two of T Level Professional Development (TLPD)","wholeLifeCost":1754.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 increased from 919m. to 1754m. This is primarily due to the following factors. At 2122-Q4 the projects total Baseline Whole Life Cost were only until 2022-23. Total Baseline Whole Life Costs have been updated to reflect up to 2024-25 in line with the latest approved Programme Business Case, and current spending review period. Our current budgeted whole life costs reflect:- actual spend from pre-2019 to 2021-22,- 2022-23 actual costs at P11 plus remaining forecast for FY,- 2023-24 to 2024-25 forecasted costs based on the latest Programme Business Case, subject to annual business planning.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. The project did not provide departmental-agree monetised benefits at 22/23-Q4. Not applicable, no monetised benefits realised by this programme","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 decreased from Amber to Red. This is primarily due to the following factors. The current IPA Delivery Confidence Assessment for T Level programme is red, following the Gate 0 review in February 2023. To address challenges to…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2023-09-30. This is primarily due to the following factors. The change in date from 30 September 2023 to 30 September 2025 is a result of the updated Business Case, drafted in September 2021, reflecting changes to business as usual and a revised project end date of 30 September 2025.","narrativeClaimKind":null},{"id":"DFE_0010_1819-Q1","year":2024,"name":"T Level Programme","department":"DFE","category":"Government Transformation and Service Delivery","description":"The current IPA Delivery Confidence Assessment for the T Level programme is AMBER, following the Gate 0 review of the programme in March 2024. The review team was impressed with the leadership and management of the T Levels programme, while noting that challenges remain in terms of growing the programme. To address these challenges and to support the programme to scale up, the programme team will: - continue to review and revise its approach to supporting the growing number and variety of providers - continue to focus on increasing employer awareness and engagement with T Levels - ensure a clear route from T Levels to the Advanced British Standard.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 decreased from Red to Amber. This is primarily due to the following factors. The current Infrastructure Project Authority's Delivery Confidence Assessment rating for the T Level Programme is amber following a Gate 0 review in Mar 24. T While the review team was impressed with the leadership and management of the T Levels programme, they noted that challenges remain in terms of scaling up the programme. To address these challenges, the programme team was advised to review and revise its approach to supporting the growing number and variety of providers and continue to focus on increasing employer awareness and engagement with T Levels. The programme team has engaged stakeholders to review these recommendations and to develop a comprehensive action plan to address them.","startDate":"2016-10-25","endDate":"2023-09-30","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2023-09-30. This is primarily due to the following factors. The change in date from 30 September 2023 to 01 September 2028 is a result of the updated Business Case (December 2023). The change reflects when the programme will move to business as usual, once all planned T Levels have been delivered to at least one cohort of students.","fyBaseline":342.0,"fyForecast":249.2,"fyVariance":-27.0,"varianceNarrative":"The budget variance exceeds 5%. Variance of -92.8m (-27%)._x000D_ CDEL - Underspend of 66.1m due to lower spend than estimated for Specialist Equipment Allocation (SEA) and Building & Facilities Improvement Grant (BFIG)._x000D_ RDEL - Underspend of 26.7m due to lower spend than estimated for 16-19 Funding, Industry Placements Employer Support Fund (ESF), and Professional Development (TLPD).","wholeLifeCost":1653.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 decreased from 1754m. to 1653m. This is primarily due to the following factors. This is primarily due to rebaselining the costs in line with the new programme business case.","benefits":0.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 0m. Compared to FY22/23, the programme's departmental-agreed monetised benefits at FY23/24 remained at 0m.","themes":["Cost & funding","Governance & assurance","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 decreased from Red to Amber. This is primarily due to the following factors. The current Infrastructure Project Authority's Delivery Confidence Assessment rating for the T Level Programme is amber following a Gate 0 review in Mar 24.…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2023-09-30. This is primarily due to the following factors. The change in date from 30 September 2023 to 01 September 2028 is a result of the updated Business Case (December 2023). The change reflects when the programme will move to business as usual, once all planned T Levels have been delivered to at least one cohort of students.","narrativeClaimKind":null},{"id":"DFE_0010_1819-Q1","year":2025,"name":"T-LEVELS","department":"DfE","category":"Government Transformation and Service Delivery","description":"T Levels are two-year technical qualifications for 16–19-year-olds, offering students practical and knowledge-based learning at a school or college and on-the-job experience through an industry placement of at least 315 hours – approximately 45 days. Equivalent in size to three A levels, a T Level focuses on vocational skills and can help students into skilled employment, higher study or apprenticeships. The T Level programme aims to increase the economic value of skills being supplied by the post-16 system, increasing take-up of high-quality qualifications to improve skills; key to supporting the government’s opportunity and growth missions.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ A NISTA Gate 0 review in June 2025 gave an Amber rating. The programme has been supporting growth of learners, subjects and providers, and T Levels have subsequently seen a 59% increase in student starts in September 2024 to over 25,000 learners. 92% of completers in the first two cohorts (who started their T Level in 2020 and 2021) are in employment or further study, and early evidence suggests that T Level learners who go directly into work, are more likely to remain in the same field than their counterparts on other large Level 3 qualifications. The programme continues to value and respond to feedback from employers, providers and students. In response to the March 2024 NISTA (formerly IPA) review, the department has: • Worked with employers and students to review and implement updated approaches to deliver industry placements and supported employer engagement in a range of priority sectors • Undertaken activity to support increasing awareness for students, teachers and parents • Made changes to reduce duplication in content & assessment in reprocured T Level contracts","startDate":"2016-10-25","endDate":"2028-09-01","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 30/09/2023 to 01/09/2028. This is primarily due to the following factors‚ Following the review of Qualifications Reform which concluded in December 2024, the defunding of large qualifications that overlap with T Levels will now be phased between August 2025 and August 2027. The last planned T Level in Marketing will be introduced in September 2025. The revised project end date reflects these key milestones. The programme continues to prioritise activity to support the scale up of students and providers, the programme is focussing on ensuring that it gathers feedback from providers and awarding organisations, with the aim of surfacing and resolving individual T Level issues and ensuring readiness for steady state delivery.","fyBaseline":351.6,"fyForecast":268.9,"fyVariance":23.52,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ Lower spend than estimated for Specialist Equipment Allocation (SEA) and Building & Facilities Improvement Grant (BFIG).","wholeLifeCost":1653.3,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 1653. This is primarily due to the following factors‚ This is unchanged from last year.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ This is unchanged from last year – no monetised benefits have been calculated for this programme.","themes":["Cost & funding","Governance & assurance","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ A NISTA Gate 0 review in June 2025 gave an Amber rating. The programme has been supporting growth of learners, subjects and providers, and T Levels have subsequently…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 30/09/2023 to 01/09/2028. This is primarily due to the following factors‚ Following the review of Qualifications Reform which concluded in December 2024, the defunding of large qualifications that overlap with T Levels will now be phased between August 2025 and August 2027. The last planned T Level in Marketing will be introduced in September 2025. The revised project end date reflects these key milestones. The programme continues to prioritise activity to support the scale up of students and providers, the programme is focussing on ensuring that it gathers feedback from providers and awarding organisations, with the aim of surfacing and resolving individual T Level issues and ensuring readiness for steady state delivery.","narrativeClaimKind":null},{"id":"DFE_0010_1819-Q1","year":2026,"name":"T-Levels","department":"DFE","category":"Government Transformation and Service Delivery","description":"T Levels are two-year technical qualifications for 16-19-year-olds, offering students practical and knowledge based learning at a school or college and on-the-job experience through an industry placement of at least 315 hours - approximately 45 days. T Levels are designed to increase the economic value of skills being supplied by the post-16 system, increasing take-up of high-quality qualifications to improve skills, key to supporting the government's opportunity and growth missions. The T Level programme aims to roll-out and support the growth of T Levels to achieve these missions and benefits.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Overall delivery confidence for 2025/26 is Amber. The programme continues to perform strongly on quality, with positive trends in participation, retention, attainment and industry placements, and independent assurance confirms clear benefits for learners and employers. Confidence has improved over the year through stable recruitment in line with forecasts, high completion of industry placements and continued ministerial support, including targeted funding to sustain delivery. The Amber rating reflects ongoing and largely structural challenges in scaling the programme to its agreed steady‑state ambition rather than a decline in performance. Key pressures include the pace required to grow participation, uneven provider and employer capacity to expand placements, and the planned introduction of a new V Level route, all of which could constrain growth despite strong outcomes. Our pathway to Green includes: steps taken to ensure T Levels are accessible by a wider range of students through updates to our delivery framework to improve the quality and availability of industry placements; making improvements to T Levels by streamlining content and reducing assessment to improve deliverability; and setting out the purpose and intent for T Levels alongside V Levels in the response to the Post-16 Level 3 and Below Pathways consultation. This will support the programme in maintaining incremental growth following the initial period of intense scale-up and ensuring T Levels remain an attractive option for students and providers.","startDate":"2016-10-25","endDate":"2028-09-01","scheduleNarrative":"The programme’s planned end date remains 01/09/2028. The programme remains on track to have delivered at least two cohorts on each of the T Levels introduced in scope of this programme by this date. All large (1080+) legacy qualifications in existing T Level areas (with the exception of Health and Social Care) will be defunded in 2027. At that point, T Levels will be the only large (1080+) qualification available for those subjects. Steady State, the point at which we expect student numbers to peak and level, changing only in response to demographic shifts, is expected to be academic year 29/30.","fyBaseline":196.89,"fyForecast":175.31,"fyVariance":10.96,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors: reclaim of the T Level capital funding Specialist Equipment Allocation (SEA), lower than anticipated final costs of the Employer Support Funds (ESF) for Health and Small or Medium Enterprises (SMEs) and Construction, and the closure of IfATE and transfer of some core functions to Skills England and then DfE resulting in some prior costs no longer being in scope of the T Level programme.","wholeLifeCost":2025.0,"costNarrative":"Compared to financial year 24/25-Q4, the programme’s departmentally agreed Whole Life Cost (measured in £m) increase from £1,653m to £1,856m. This reflects the 25/26 budget being agreed and added to the WLC.","benefits":null,"benefitsNarrative":"The T Levels Programme does not yet report on its monetised benefit as longitudinal earnings data has not yet become available. From next year the programme will be able to report on this.","themes":["Cost & funding","Delivery & schedule","Scope & requirements","Workforce & capability"],"evidenceExcerpt":"Overall delivery confidence for 2025/26 is Amber. The programme continues to perform strongly on quality, with positive trends in participation, retention, attainment and industry placements, and independent assurance confirms clear benefits for learners and employers. Confidence has improved over the year through stable recruitment in line with forecasts,…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The programme’s planned end date remains 01/09/2028. The programme remains on track to have delivered at least two cohorts on each of the T Levels introduced in scope of this programme by this date. All large (1080+) legacy qualifications in existing T Level areas (with the exception of Health and Social Care) will be defunded in 2027. At that point, T Levels will be the only large (1080+) qualification available for those subjects. Steady State, the point at which we expect student numbers to peak and level, changing only in response to demographic shifts, is expected to be academic year 29/30.","narrativeClaimKind":null}],"previous":{"id":"DFE_0010_1819-Q1","year":2025,"name":"T-LEVELS","department":"DfE","category":"Government Transformation and Service Delivery","description":"T Levels are two-year technical qualifications for 16–19-year-olds, offering students practical and knowledge-based learning at a school or college and on-the-job experience through an industry placement of at least 315 hours – approximately 45 days. Equivalent in size to three A levels, a T Level focuses on vocational skills and can help students into skilled employment, higher study or apprenticeships. The T Level programme aims to increase the economic value of skills being supplied by the post-16 system, increasing take-up of high-quality qualifications to improve skills; key to supporting the government’s opportunity and growth missions.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ A NISTA Gate 0 review in June 2025 gave an Amber rating. The programme has been supporting growth of learners, subjects and providers, and T Levels have subsequently seen a 59% increase in student starts in September 2024 to over 25,000 learners. 92% of completers in the first two cohorts (who started their T Level in 2020 and 2021) are in employment or further study, and early evidence suggests that T Level learners who go directly into work, are more likely to remain in the same field than their counterparts on other large Level 3 qualifications. The programme continues to value and respond to feedback from employers, providers and students. In response to the March 2024 NISTA (formerly IPA) review, the department has: • Worked with employers and students to review and implement updated approaches to deliver industry placements and supported employer engagement in a range of priority sectors • Undertaken activity to support increasing awareness for students, teachers and parents • Made changes to reduce duplication in content & assessment in reprocured T Level contracts","startDate":"2016-10-25","endDate":"2028-09-01","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 30/09/2023 to 01/09/2028. This is primarily due to the following factors‚ Following the review of Qualifications Reform which concluded in December 2024, the defunding of large qualifications that overlap with T Levels will now be phased between August 2025 and August 2027. The last planned T Level in Marketing will be introduced in September 2025. The revised project end date reflects these key milestones. The programme continues to prioritise activity to support the scale up of students and providers, the programme is focussing on ensuring that it gathers feedback from providers and awarding organisations, with the aim of surfacing and resolving individual T Level issues and ensuring readiness for steady state delivery.","fyBaseline":351.6,"fyForecast":268.9,"fyVariance":23.52,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ Lower spend than estimated for Specialist Equipment Allocation (SEA) and Building & Facilities Improvement Grant (BFIG).","wholeLifeCost":1653.3,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 1653. This is primarily due to the following factors‚ This is unchanged from last year.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ This is unchanged from last year – no monetised benefits have been calculated for this programme.","themes":["Cost & funding","Governance & assurance","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ A NISTA Gate 0 review in June 2025 gave an Amber rating. The programme has been supporting growth of learners, subjects and providers, and T Levels have subsequently…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 30/09/2023 to 01/09/2028. This is primarily due to the following factors‚ Following the review of Qualifications Reform which concluded in December 2024, the defunding of large qualifications that overlap with T Levels will now be phased between August 2025 and August 2027. The last planned T Level in Marketing will be introduced in September 2025. The revised project end date reflects these key milestones. The programme continues to prioritise activity to support the scale up of students and providers, the programme is focussing on ensuring that it gathers feedback from providers and awarding organisations, with the aim of surfacing and resolving individual T Level issues and ensuring readiness for steady state delivery.","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":0,"attentionScore":22,"attentionReasons":["Current published delivery confidence is Amber","In-year forecast variance is +11.0%"]},{"id":"MOD_0078_1213-Q1","year":2026,"name":"CORE PRODUCTION CAPABILITY","department":"MOD","category":"Military Capability","description":"The Core Production Capability (CPC) delivers the capability required to manufacture nuclear reactor cores for the Royal Navy's nuclear submarine programme. At programme closure, CPC will have provided the Royal Navy with the means to propel a renewed Deterrent submarine fleet plus a UK-based capability to manufacture further cores for a fleet of flexible and adaptable attack submarines delivered under the AUKUS agreement.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 increased to Amber. This is primarily due to the following factors. 1. Reflects delivery of the final core for the Astute class of submarines and increasing maturity of the work required to deliver the core manufacturing capability required for the next generation of UK (and Australian) attack submarines. 2. Work continues with Rolls-Royce Submarines to to ensure timely delivery of the first of a new core type required for the Dreadnought-class of submarines.","startDate":"2012-04-23","endDate":"2043-12-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same from 31/12/2043 to 31/12/2043.","fyBaseline":403.39,"fyForecast":372.04,"fyVariance":7.77,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to savings identified in year which reduced anticipated programme costs associated with the transport of completed reactor cores to the shipbuilder.","wholeLifeCost":7784.34,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally-agreed Whole Life Cost at 25/26-Q4 increased from £5930.6M to £8877.8M. This is primarily due to an expansion in the programme scope to create the manufacturing capability needed to produce cores for the next generation UK and Australian attack submarines. This cost increase is based on early estimates for the work required and will change as detailed design and planning work proceeds and is reflected in Departmental budgets allocated to the programme.","benefits":null,"benefitsNarrative":"Compared to financial year 2024/25-Q4, the project's departmental-agreed monetised benefits at 2025/26-Q4 remained at £0m.","themes":["Cost & funding","Delivery & schedule","Scope & requirements","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 increased to Amber. This is primarily due to the following factors. 1. Reflects delivery of the final core for the Astute class of submarines and increasing maturity of the work required to deliver the core manufacturing capability required for the…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same from 31/12/2043 to 31/12/2043.","narrativeClaimKind":null,"history":[{"id":"MOD_0078_1213-Q1","year":2020,"name":"Core Production Capability","department":"MOD","category":"Military Capability","description":"Delivers safe nuclear reactor cores to meet the Royal Navy's submarine programme, now and for the long term.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber, which has not changed since last year�s Q2 1819 Amber, due primarily to the following factors; - The Core Production Capability (CPC) Project is the phased regeneration of the current nuclear core production facilities on the Rolls-Royce Site at Raynesway in Derby, the sustainment of the current capability and the production, development and manufacture of the nuclear reactor cores to meet Astute and Dreadnought technical specifications. The Amber Delivery Confidence Assessment (DCA) recognised completion of significant work to re-baseline the CPC project and enhance governance arrangements. - The DCA remains Amber to recognise the remaining schedule and technical risk in delivering a new core to meet the Dreadnought build programme.","startDate":"2012-04-01","endDate":"2028-04-30","scheduleNarrative":"The scheduled baseline project end date at Q2 1920 (30th September 2019) is 30/04/28, has not changed since last year's Q2 1819 date of 30/04/28, due primarily to the following factors; - The baseline end date remains unchanged at 30 April 2028 and will be revised once Phase 2 infrastructure designs have matured.","fyBaseline":163.58,"fyForecast":163.11,"fyVariance":0.0,"varianceNarrative":"Budget variance less than 5%","wholeLifeCost":1826.71,"costNarrative":"The baseline Whole Life Cost at Q2 1920 (30th September 2019) is �1,826.71 m, has increased by �167.48 m since last year's Q2 1819 (�m) baseline Whole Life Cost of �1,659.23 m, due primarily to the following factors; - A re-baselining of the CPC project was approved in early 2019 which incorporated a revised scope and updated cost estimates.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Scope & requirements","Technical & integration"],"evidenceExcerpt":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber, which has not changed since last year�s Q2 1819 Amber, due primarily to the following factors; - The Core Production Capability (CPC) Project is the phased regeneration of the current nuclear core production facilities on the Rolls-Royce Site at Raynesway in…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2020","sourceLabel":"IPA Annual Report 2019-20","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The scheduled baseline project end date at Q2 1920 (30th September 2019) is 30/04/28, has not changed since last year's Q2 1819 date of 30/04/28, due primarily to the following factors; - The baseline end date remains unchanged at 30 April 2028 and will be revised once Phase 2 infrastructure designs have matured.","narrativeClaimKind":null},{"id":"MOD_0078_1213-Q1","year":2021,"name":"Core Production Capability","department":"MOD","category":"Military Capability","description":"Delivers safe nuclear reactor cores to meet the Royal Navy's submarine programme, now and for the long term.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber. This is primarily due to the following factors: Although significant progress has been made in delivering new manufacturing capability since the last transparency return, the magnitude of the remaining risk is not yet sufficiently low to declare an improved delivery confidence.","startDate":"2012-04-23","endDate":"2028-04-30","scheduleNarrative":"Compared to financial year 19/20-Q2, the project's end-date remained scheduled to finish on 30 April 2028 . This is primarily due to the following factors:","fyBaseline":142.22,"fyForecast":141.01,"fyVariance":-1.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":1826.16,"costNarrative":"Compared to financial year 19/20-Q2, the projects Baseline Whole Life Cost decreased from 1826.71m to �1826.16m. This is primarily due to the following factors: The forecast costs for the programme have remained broadly stable with a minor reduction in residual risk as a result of the project's robust governance structures.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber. This is primarily due to the following factors: Although significant progress has been made in delivering new manufacturing capability since the last transparency return, the magnitude of the remaining risk is not yet…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 19/20-Q2, the project's end-date remained scheduled to finish on 30 April 2028 . This is primarily due to the following factors:","narrativeClaimKind":null},{"id":"MOD_0078_1213-Q1","year":2022,"name":"Core Production Capability","department":"MOD","category":"Military Capability","description":"Delivers safe nuclear reactor cores to meet the Royal Navy's submarine programme, now and for the long term.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating decreased from Amber to Red. This is primarily due to the following factors: Significant and ongoing challenges associated with achieving the required core delivery date for Dreadnought and the importance of that milestone to sustaining the Continuous at Sea Deterrent.","startDate":"2012-04-01","endDate":"2028-04-30","scheduleNarrative":"Compared to 2021-Q4, the project end-date remained scheduled to finish on 30 April 2028.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 26 of the Freedom of Information Act 2000 (Defence)","wholeLifeCost":null,"costNarrative":"Exempt under Section 26 of the Freedom of Information Act 2000 (Defence)","benefits":null,"benefitsNarrative":"","themes":["Delivery & schedule","Cost & funding"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating decreased from Amber to Red. This is primarily due to the following factors: Significant and ongoing challenges associated with achieving the required core delivery date for Dreadnought and the importance of that milestone to sustaining the…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to 2021-Q4, the project end-date remained scheduled to finish on 30 April 2028.","narrativeClaimKind":null},{"id":"MOD_0078_1213-Q1","year":2023,"name":"Core Production Capability","department":"MOD","category":"Military Capability","description":"The Core Production Capability (CPC) delivers safe nuclear reactor cores to meet the Royal Navy's submarine programme; now and for the long term. At programme closure; CPC will have provided the Royal Navy with the means to propel a renewed Deterrent submarine fleet; and will have provided the UK with a modern; safe; and Sovereign capability to manufacture further cores for a fleet of flexible and adaptable attack submarines.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Red. This is primarily due to the following factors. Significant and ongoing challenges associated with achieving the required core delivery date for Dreadnought and the importance of that milestone to sustaining the Continuous at Sea Deterrent.","startDate":"2012-04-23","endDate":"2028-04-30","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2028-04-30. This is primarily due to the following factors. Whilst the programme schedule has been maintained compared to 12 months ago, in future this schedule will be revised to incorporate the completion of the infrastructure design phase.","fyBaseline":171.38,"fyForecast":178.46,"fyVariance":4.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":3772.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 22/23-Q4 is 3772m. This is primarily due to the following factors. This represents the full costs including budget estimates for scope that has not yet been approved.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This programme does not report cashable benefits. Its aim is to provision the armed forces with the equipment and / or infrastructure required.","themes":["Delivery & schedule","Cost & funding","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Red. This is primarily due to the following factors. Significant and ongoing challenges associated with achieving the required core delivery date for Dreadnought and the importance of that milestone to sustaining the…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2028-04-30. This is primarily due to the following factors. Whilst the programme schedule has been maintained compared to 12 months ago, in future this schedule will be revised to incorporate the completion of the infrastructure design phase.","narrativeClaimKind":null},{"id":"MOD_0078_1213-Q1","year":2024,"name":"Core Production Capability","department":"MOD","category":"Military Capability","description":"The Core Production Capability programme delivers safe nuclear reactor cores to meet the Royal Navy's submarine programme, now and for the long term. At closure, the programme will have provided the Royal Navy with the means to propel a renewed Deterrent submarine fleet, and will have provided the UK with a modern, safe, and Sovereign capability to manufacture further cores for a fleet of flexible and adaptable attack submarines delivered under the AUKUS agreement.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure and Projects Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Red. This is primarily due to the following factors. Ongoing challenges associated with achieving the required delivery date for the first Dreadnought submarine nuclear core and the importance of that milestone to sustaining the Continuous at Sea Deterrent. The programme is working closely with the supplier to address the risks involved to ensure core delivery remains aligned to Dreadnought Boat 1 delivery progress, whilst delivering the last core for the Astute-class of submarines.","startDate":"2012-04-23","endDate":"2028-04-30","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained scheduled to finish on 2028-04-30. This will need to be revised to reflect scope changes later this year as a result of core requirements for AUKUS, the revised scope will likely be approved in mid 2024.","fyBaseline":255.8,"fyForecast":249.18,"fyVariance":-2.588,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":4051.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 increased from 3772m to 4051m. This is primarily due to the following factors. Inflation cost increases.","benefits":0.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 0m.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure and Projects Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Red. This is primarily due to the following factors. Ongoing challenges associated with achieving the required delivery date for the first Dreadnought submarine nuclear core and the importance of that milestone to…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained scheduled to finish on 2028-04-30. This will need to be revised to reflect scope changes later this year as a result of core requirements for AUKUS, the revised scope will likely be approved in mid 2024.","narrativeClaimKind":null},{"id":"MOD_0078_1213-Q1","year":2025,"name":"CORE PRODUCTION CAPABILITY","department":"MoD","category":"Military Capability","description":"The Core Production Capability (CPC) delivers safe nuclear reactor cores to meet the Royal Navy's submarine programme, now and for the long term. At programme closure, CPC will have provided the Royal Navy with the means to propel a renewed Deterrent submarine fleet, and will have provided the UK with a modern, safe, and Sovereign capability to manufacture further cores for a fleet of flexible and adaptable attack submarines delivered under the AUKUS agreement.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at RED. This is primarily due to the following factors. Ongoing challenges associated with achieving the required delivery date for the first Dreadnought submarine nuclear core and the importance of that milestone to sustaining the Continuous at Sea Deterrent. Work continues with Rolls-Royce Submarines to address the risks involved and ensure core delivery remains aligned to Dreadnought Boat 1 delivery progress, whilst also delivering the last core for the Astute class of submarines.","startDate":"2012-04-23","endDate":"2043-12-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 30/04/2028 to 31/12/2043. This is primarily due to the following factors. Increased scope. Programme end-date has been adjusted as this is the date by which the core manufacturing capabilities necessary to manufacture cores for the next generation of UK (and Australian) attack submarines is planned to achieve Full Operating Capability. This element of the programme was given Ministerial Approval in October 24 and the increased scope has now been incorporated.","fyBaseline":348.39,"fyForecast":368.79,"fyVariance":5.86,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. Inflationary pressures on purchases of specialist materials, additional operating costs to increase production rates and delays to keys elements of the programme.","wholeLifeCost":5930.6,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 4051 to 5930. This is primarily due to the following factors. Scope change to generate the manufacturing capability to deliver cores for the next generation UK and Australian attack submarines. This cost increase reflects early estimates for some of the work required to generate this capability and will change/increase as detailed design and development work proceeds and is reflected in Departmental budgets allocated to the programme.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits","themes":["Cost & funding","Delivery & schedule","Scope & requirements","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at RED. This is primarily due to the following factors. Ongoing challenges associated with achieving the required delivery date for the first Dreadnought submarine nuclear core and the importance of that milestone to sustaining the Continuous at Sea…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 30/04/2028 to 31/12/2043. This is primarily due to the following factors. Increased scope. Programme end-date has been adjusted as this is the date by which the core manufacturing capabilities necessary to manufacture cores for the next generation of UK (and Australian) attack submarines is planned to achieve Full Operating Capability. This element of the programme was given Ministerial Approval in October 24 and the increased scope has now been incorporated.","narrativeClaimKind":null},{"id":"MOD_0078_1213-Q1","year":2026,"name":"CORE PRODUCTION CAPABILITY","department":"MOD","category":"Military Capability","description":"The Core Production Capability (CPC) delivers the capability required to manufacture nuclear reactor cores for the Royal Navy's nuclear submarine programme. At programme closure, CPC will have provided the Royal Navy with the means to propel a renewed Deterrent submarine fleet plus a UK-based capability to manufacture further cores for a fleet of flexible and adaptable attack submarines delivered under the AUKUS agreement.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 increased to Amber. This is primarily due to the following factors. 1. Reflects delivery of the final core for the Astute class of submarines and increasing maturity of the work required to deliver the core manufacturing capability required for the next generation of UK (and Australian) attack submarines. 2. Work continues with Rolls-Royce Submarines to to ensure timely delivery of the first of a new core type required for the Dreadnought-class of submarines.","startDate":"2012-04-23","endDate":"2043-12-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same from 31/12/2043 to 31/12/2043.","fyBaseline":403.39,"fyForecast":372.04,"fyVariance":7.77,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to savings identified in year which reduced anticipated programme costs associated with the transport of completed reactor cores to the shipbuilder.","wholeLifeCost":7784.34,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally-agreed Whole Life Cost at 25/26-Q4 increased from £5930.6M to £8877.8M. This is primarily due to an expansion in the programme scope to create the manufacturing capability needed to produce cores for the next generation UK and Australian attack submarines. This cost increase is based on early estimates for the work required and will change as detailed design and planning work proceeds and is reflected in Departmental budgets allocated to the programme.","benefits":null,"benefitsNarrative":"Compared to financial year 2024/25-Q4, the project's departmental-agreed monetised benefits at 2025/26-Q4 remained at £0m.","themes":["Cost & funding","Delivery & schedule","Scope & requirements","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 increased to Amber. This is primarily due to the following factors. 1. Reflects delivery of the final core for the Astute class of submarines and increasing maturity of the work required to deliver the core manufacturing capability required for the…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same from 31/12/2043 to 31/12/2043.","narrativeClaimKind":null}],"previous":{"id":"MOD_0078_1213-Q1","year":2025,"name":"CORE PRODUCTION CAPABILITY","department":"MoD","category":"Military Capability","description":"The Core Production Capability (CPC) delivers safe nuclear reactor cores to meet the Royal Navy's submarine programme, now and for the long term. At programme closure, CPC will have provided the Royal Navy with the means to propel a renewed Deterrent submarine fleet, and will have provided the UK with a modern, safe, and Sovereign capability to manufacture further cores for a fleet of flexible and adaptable attack submarines delivered under the AUKUS agreement.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at RED. This is primarily due to the following factors. Ongoing challenges associated with achieving the required delivery date for the first Dreadnought submarine nuclear core and the importance of that milestone to sustaining the Continuous at Sea Deterrent. Work continues with Rolls-Royce Submarines to address the risks involved and ensure core delivery remains aligned to Dreadnought Boat 1 delivery progress, whilst also delivering the last core for the Astute class of submarines.","startDate":"2012-04-23","endDate":"2043-12-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 30/04/2028 to 31/12/2043. This is primarily due to the following factors. Increased scope. Programme end-date has been adjusted as this is the date by which the core manufacturing capabilities necessary to manufacture cores for the next generation of UK (and Australian) attack submarines is planned to achieve Full Operating Capability. This element of the programme was given Ministerial Approval in October 24 and the increased scope has now been incorporated.","fyBaseline":348.39,"fyForecast":368.79,"fyVariance":5.86,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. Inflationary pressures on purchases of specialist materials, additional operating costs to increase production rates and delays to keys elements of the programme.","wholeLifeCost":5930.6,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 4051 to 5930. This is primarily due to the following factors. Scope change to generate the manufacturing capability to deliver cores for the next generation UK and Australian attack submarines. This cost increase reflects early estimates for some of the work required to generate this capability and will change/increase as detailed design and development work proceeds and is reflected in Departmental budgets allocated to the programme.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits","themes":["Cost & funding","Delivery & schedule","Scope & requirements","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at RED. This is primarily due to the following factors. Ongoing challenges associated with achieving the required delivery date for the first Dreadnought submarine nuclear core and the importance of that milestone to sustaining the Continuous at Sea…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 30/04/2028 to 31/12/2043. This is primarily due to the following factors. Increased scope. Programme end-date has been adjusted as this is the date by which the core manufacturing capabilities necessary to manufacture cores for the next generation of UK (and Australian) attack submarines is planned to achieve Full Operating Capability. This element of the programme was given Ministerial Approval in October 24 and the increased scope has now been incorporated.","narrativeClaimKind":null},"ratingDelta":-1,"transition":"Improved","endDateDeltaDays":0,"attentionScore":21,"attentionReasons":["Current published delivery confidence is Amber","In-year forecast variance is +7.8%"]},{"id":"MHCLG_0004_2021-Q4","year":2026,"name":"HOUSING INFRASTRUCTURE FUND","department":"MHCLG","category":"Infrastructure and Construction","description":"The Housing Infrastructure Fund (HIF) provides capital funding for critical infrastructure, such as transport, utilities and site remediation, to unlock housing delivery. The programme is expected to unlock the construction of circa 255k homes.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. The rating reflects the delivery broadly in line with expectations alongside ongoing complexity in the final stages of the programme. Homes England and MHCLG have proactively managed risk across the largest and most complex Forward Fund projects, where the majority of remaining activity is concentrated. While delivery remains stable, external market, economic and environmental factors continue to impact progress at project level and require active mitigation. The programme has responded to assurance findings, implementing NISTA recommendations including revisions to delegated authority limits to streamline decision-making and further development of the risk and controls framework to reflect programme maturity. With the National Housing Delivery Fund now approved and launched, HIF will transition into a unified governance structure, strengthening oversight and ensuring consistent management of delivery, risk, cost and performance across legacy and successor activity.","startDate":"2016-12-30","endDate":"2028-03-31","scheduleNarrative":"There has been no change to the schedule for the programme.","fyBaseline":516.47,"fyForecast":470.17,"fyVariance":8.96,"varianceNarrative":"The in-year budget variance exceeds 5%, reflecting reduced close-down costs, programme delays and under-utilised contingency, alongside the withdrawal of a scheme. Delivery risk continues to be actively managed across the largest and most complex projects, where the majority of remaining HIF expenditure is concentrated.","wholeLifeCost":4250.15,"costNarrative":"The WLC has decreased by £131m, reflecting a number of material amendments across the programme and adjustments for inflation in real terms. These include project withdrawals and changes to delivery scope and timing, with some costs being deferred into later years as schemes progress. The incorporation of HIF headroom into the NHDF portfolio has also contributed to changes in future expenditure projections.","benefits":10600.36,"benefitsNarrative":"Change requests this Financial Year have had a mixture of positive and negative impacts on monetised benefits resulting in no significant changes to monetised benefits. The programme delivers benefits through enabling infrastructure (including roads, rail and schools) and the unlocking of net additional homes, alongside wider economic and regeneration impacts. Evidence gathered through the HIF Benefits Strategy is informing the approach to reporting both monetisable and non-monetisable outcomes.","themes":["Delivery & schedule","Cost & funding","Governance & assurance","Commercial & supply chain"],"evidenceExcerpt":"The SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. The rating reflects the delivery broadly in line with expectations alongside ongoing complexity in the final stages of the programme. Homes England and MHCLG have proactively managed risk across the largest and most complex Forward Fund projects, where the majority of…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"There has been no change to the schedule for the programme.","narrativeClaimKind":null,"history":[{"id":"MHCLG_0004_2021-Q4","year":2021,"name":"Housing Infrastructure Fund","department":"MHCLG","category":"Infrastructure and Construction","description":"The Housing Infrastructure Fund supports the government's ambition to increase housebuilding to 300,000 per year by the mid-2020s, by providing up-front infrastructure to drive housing delivery. HIF will provide local authorities with �4.37bn of infrastructure funding to unlock 326,000 homes in all regions of England.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber.This is primarily due to the following factors: IPA carried out a Gate 0 review in November 2020, and gave HIF an amber delivery confidence rating, which is what would be expected for a programme of this size and complexity. HIF's migration on to the Government Major Projects Portfolio will provide additional IPA oversight and resources to support the programme.","startDate":"2016-12-30","endDate":"2028-03-31","scheduleNarrative":"The project end-date is 31 March 2028. This is primarily due to the following factors: HIF is on schedule and due for completion in 2028. HIF has completed the contracting stage and is moving into the delivery stage which will be complete by 2024 for the majority of the projects.","fyBaseline":270.3,"fyForecast":238.2,"fyVariance":-12.0,"varianceNarrative":"The budget variance exceeds 5%. CDEL drawn down during FY20/21 was �32m less than the Supplementary Estimate. This is primarily as a consequence of challenges faced by local authorities and their delivery partners during the C-19 pandemic.","wholeLifeCost":4361.56,"costNarrative":"The projects Baseline Whole Life Cost is �4361.56m. This is primarily due to the following factors: The Whole Life Cost is as set out as �4.37 Billion. Quarter 4 20/21 is the HIF programme's first quarterly report for GMPP.","benefits":null,"benefitsNarrative":"","themes":["Delivery & schedule","Cost & funding","Governance & assurance","Technical & integration"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber.This is primarily due to the following factors: IPA carried out a Gate 0 review in November 2020, and gave HIF an amber delivery confidence rating, which is what would be expected for a programme of this size and complexity. HIF's migration on to the Government Major…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project end-date is 31 March 2028. This is primarily due to the following factors: HIF is on schedule and due for completion in 2028. HIF has completed the contracting stage and is moving into the delivery stage which will be complete by 2024 for the majority of the projects.","narrativeClaimKind":null},{"id":"MHCLG_0004_2021-Q4","year":2022,"name":"Housing Infrastructure Fund","department":"DLUHC","category":"Infrastructure and Construction","description":"The Housing Infrastructure Fund (HIF) supports the Government's ambition to increase housebuilding to 300,000 per year by mid 2020's, by providing up-front infrastructure to drive housing delivery. HIF will provide local authorities with £4.3 billion of infrastructure funding to unlock building of 320,000 homes in all regions of England.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The latest Gate 0 Review gave Housing Infrastructure Fund (HIF) an Amber rating. The report recognises progress, noting that homes are already being delivered on some smaller sites, and good collaborative working with delivery partners. The Amber rating takes into account the current inflationary environment and rising risks to delivery. Work is underway to progress actions based on the report's recommendations; a reference class forecast is being developed to better understand the cost and schedule parameters, an Accounting Officer review is underway to provide further assurance on programme delivery, and Homes England have commissioned independent reviews at a project level on costs and schedule risks as projects move from early, post-contract work, into on-site delivery. We will have the results of the ten most high-risk projects by Q2 2022/23, to make decisions through programme governance by Q3 2022/23. The business case is being updated ahead of the next Gate 0 Review due in Q3 2022/23.","startDate":"2016-12-30","endDate":"2028-03-31","scheduleNarrative":"Compared to 2021-Q4, your project end-date remained scheduled to finish on 31 MAR 2028. HIF is now in its delivery stage, with all remaining schemes contracted during 2021/22, over 90% of homes unlocked (i.e. with post-contract conditions sufficiently discharged to allow draw-down of funding to begin), and c.60 schemes on site. However, it is operating within an unprecedented and complex economic climate, taking into account impacts of the pandemic and wider inflationary pressures. HIF is facing cost and scheduling challenges which may extend the expected delivery timescales for some schemes. Work is taking place to understand and respond to these pressures, and the appropriate governance exists to support this work and ensure the programme remains able to deliver on its objectives.","fyBaseline":901.5,"fyForecast":393.3,"fyVariance":-56.0,"varianceNarrative":"Funding drawn on national schemes is lower than forecast, this is due to the following reasons reported by Homes England: - Delivery challenges arising from the pandemic, this includes the impact on local authorities (LA), such as re-allocating project staff onto Covid response related work, delays to activities such as survey work, planning decisions, site closures and reduced site productivity. It also includes the impact on LA development partners and current supply chain shortages and disruption for both labour and materials. - Withdrawal of several schemes from the programme in 2021. - There have also been delays in London which caused an underspend in this area. - Finally, decisions needed on funding increases, within the portfolio, have further shifted spend into future years.","wholeLifeCost":4334.0,"costNarrative":"Compared to 2021-Q4, the projects Baseline Whole Life Cost decreased from 4361.56 (£m) to 4334.96 (£m). This small movement relates to a correction to last year's figure rather than reduction to the forecast.","benefits":null,"benefitsNarrative":"","themes":["Delivery & schedule","Cost & funding","Governance & assurance","Commercial & supply chain"],"evidenceExcerpt":"The latest Gate 0 Review gave Housing Infrastructure Fund (HIF) an Amber rating. The report recognises progress, noting that homes are already being delivered on some smaller sites, and good collaborative working with delivery partners. The Amber rating takes into account the current inflationary environment and rising risks to delivery. Work is underway to…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to 2021-Q4, your project end-date remained scheduled to finish on 31 MAR 2028. HIF is now in its delivery stage, with all remaining schemes contracted during 2021/22, over 90% of homes unlocked (i.e. with post-contract conditions sufficiently discharged to allow draw-down of funding to begin), and c.60 schemes on site. However, it is operating within an unprecedented and complex economic climate, taking into account impacts of the pandemic and wider inflationary pressures. HIF is facing cost and scheduling challenges which may extend the expected delivery timescales for some schemes. Work is taking place to understand and respond to these pressures, and the appropriate governance exists to support this work and ensure the programme remains able to deliver on its objectives.","narrativeClaimKind":null},{"id":"MHCLG_0004_2021-Q4","year":2023,"name":"Housing Infrastructure Fund","department":"DLUHC","category":"Infrastructure and Construction","description":"The Housing Infrastructure Fund is a 4.2bn major government programme which provides funding for infrastructure projects, which once built, will unlock housing capacity in areas of high housing demand. Through funding 124 infrastructure schemes in all regions of England, HIF is expected to unlock the construction of up to 300,000 homes.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 decreased from Amber to Red. This is primarily due to the following factors. The programmes delivery confidence rating remained at RED, due to increasing inflationary pressures impacting costs and causing delays in delivery. Since the IPA Gate 0 review, work has focused on resetting programme management processes to improve delivery oversight and forecasting, through a Business Case reset, aiming to: - Maximise unlocked housing and infrastructure delivery, whilst being deliverable within time and cost constraints and within grant funding agreements. - Ensure the programme is on sustainable financial and delivery footing, through reprofiling the budget and noting the need for extended funding availability period. - Provide increased assurance on forecasting, contractual management and change control. - Improve programme and project level reporting, introducing monthly Forward Funding scheme reports to manage project level performance against baselines, aggregated for programme oversight. - Provide robust governance and decision-making methodology as schemes go into default, seek to remediate, or request a Material Change to address challenges faced","startDate":"2016-12-30","endDate":"2028-03-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2028-03-31. This is primarily due to the following factors. Delayed delivery is primarily due to macro-economic factors impacting the sector. The pandemic, inflation, the war in Ukraine, and supply chain issues have led to additional pressures, with underspends predicted across the current spending period. The updated Business Case recognises these challenges and seeks to reprofile the budget. Time-extension decisions at a project level will be made case-by-case, and the programme will streamline decision-making to drive delivery. The Housing Infrastructure Fund (HIF) will boost resources with additional posts and third-party support within Homes England and DLUHC, to build adequate capacity and capability. The programmes end date is unchanged due to the reset through the business case, including changes to underlying cost/time assumptions; descoping projects getting them back on track or removing/withdrawing them from the programme. The team has implemented quarterly portfolio prioritisation reviews of projects, based on deliverability, value for money and strategic fit to inform decisions on change requests.","fyBaseline":1049.9,"fyForecast":450.2,"fyVariance":-57.0,"varianceNarrative":"The budget variance exceeds 5%. The funding drawn in year is lower than forecasted primarily due to the macro-economic factors described which have raised costs across the larger Forward Funding portfolio. In addition to this, contractor appetite, resourcing, and Local Authority capacity have contributed to delay in funding being drawn and spend being deferred into future years.","wholeLifeCost":4334.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 remained at 4334m. This is primarily due to the following factors. Diverted resources will be used to support better performing projects. The whole life cost reflects the natural shift of the programme level budgets against the mitigations that the HIF team has put into place, as projects progress in their lifecycle, shifting costs over time, and in some cases withdraw from the programme. Attrition is due to the withdrawal of one Forward Funding and three Marginal Viability Fund schemes, and the reduction of the resourcing expenditure in future years due to budgetary constraints.","benefits":18400.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 18400m. The project's departmental-agree monetised benefits at 22/23-Q4 is 18400m. The current value of 18.4bn is the sum of the final moderated bids that was used to make the original project approvals, plus the removal of the costs and benefits associated with the schemes that were known to be withdrawing at the time it was last calculated (in 2021). The land value uplift estimates within the moderated bids for Forward Funding schemes were based on development appraisals undertaken at the time to support bids. Benefits are under review and have been outlined in the Business case reset.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 decreased from Amber to Red. This is primarily due to the following factors. The programmes delivery confidence rating remained at RED, due to increasing inflationary pressures impacting costs and causing delays in delivery. Since…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2028-03-31. This is primarily due to the following factors. Delayed delivery is primarily due to macro-economic factors impacting the sector. The pandemic, inflation, the war in Ukraine, and supply chain issues have led to additional pressures, with underspends predicted across the current spending period. The updated Business Case recognises these challenges and seeks to reprofile the budget. Time-extension decisions at a project level will be made case-by-case, and the programme will streamline decision-making to drive delivery. The Housing Infrastructure Fund (HIF) will boost resources with additional posts and third-party support within Homes England and DLUHC, to build adequate capacity and capability. The programmes end date is unchanged due to the reset through the business case, including changes to underlying cost/time assumptions; descoping projects getting them back on track or removing/withdrawing them from the programme. The team has implemented quarterly portfolio prioritisation reviews of projects, based on deliverability, value for money and strategic fit to inform decisions on change requests.","narrativeClaimKind":null},{"id":"MHCLG_0004_2021-Q4","year":2024,"name":"Housing Infrastructure Fund","department":"DLUHC","category":"Infrastructure and Construction","description":"The Housing Infrastructure Fund (HIF) provides funding for infrastructure projects, which once built, will unlock housing capacity in areas of high demand. The programme is expected to unlock the construction of circa 260k homes.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 decreased from Red to Amber. This is primarily due to the following factors. As at March 24: We continue to assess the delivery confidence of the programme as amber._x000D_ _x000D_ To maintain delivery confidence, the programme continues to embed new processes developed through the business case reset, along with implementing IPA recommendations.","startDate":"2016-12-30","endDate":"2028-03-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2028-03-31. This is primarily due to the following factors. As at March 24: The project's end-date is March 2028. This is an extension from March 2026 as agreed in a revised business case in 2023.","fyBaseline":499.4,"fyForecast":543.3,"fyVariance":9.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The 2023 refreshed HIF business case re-baselined the cost profile and unlocked delivery for a number of projects that had been stalled, enabling some local authorities to deliver faster than forecast.","wholeLifeCost":4257.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 decreased from 4334m. to 4257m. This is primarily due to the following factors. Whole life cost decreased from 4334m to 4257m due to a re-baseline in 2023.","benefits":11600.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 2324-Q4 decreased from 18400m. to 11600m. Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 2324-Q4 decreased from 18400m. to 11600m. This is due to projects descoping or withdrawing from the programme on deliverability grounds.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 decreased from Red to Amber. This is primarily due to the following factors. As at March 24: We continue to assess the delivery confidence of the programme as amber._x000D_ _x000D_ To maintain delivery confidence, the programme…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2028-03-31. This is primarily due to the following factors. As at March 24: The project's end-date is March 2028. This is an extension from March 2026 as agreed in a revised business case in 2023.","narrativeClaimKind":null},{"id":"MHCLG_0004_2021-Q4","year":2025,"name":"HOUSING INFRASTRUCTURE FUND","department":"MHCLG","category":"Infrastructure and Construction","description":"The Housing Infrastructure Fund (HIF) provides funding for infrastructure projects which, once delivered, will unlock housing capacity, mainly in areas of high demand. The programme is expected to unlock the construction of circa 255k homes.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors: Spend has continued to accelerate and delivery is on a sound footing. Market and economic conditions and other factors, including environmental, do however continue to impact delivery of individual projects, and these are being managed carefully. To maintain delivery confidence, we are closely monitoring programme headroom, to avoid a programme-level under- or over-spend and unnecessary loss of unlocked housing. We are also implementing recommendations from HIF’s most recent NISTA annual review, including further streamlining decision-making processes and updating our forecasting model to more accurately reflect the maturity of the programme.","startDate":"2016-12-30","endDate":"2028-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2028. This is primarily due to the following factors: The HIF programme spend deadline remains 31/03/28, as agreed in the revised business case in 2023.","fyBaseline":744.8,"fyForecast":740.0,"fyVariance":0.64,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":4263.7,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 4257 to 4263.7. This is primarily due to the following factors: Since the 2023 business case reset, there has been a slight increase in total forecast RDEL and CDEL spend, including an adjustment in legal and evaluation costs.","benefits":11700.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 11600 to 11700. This is primarily due to the following factors: Programme monetised benefits estimates are reviewed periodically to account for projects descoping or withdrawing from the programme on deliverability grounds. Most significant project changes and withdrawals were factored into the end-FY 23/24 estimate. Change requests since then have been relatively minor, with a mixture of positive and negative impacts on monetised benefits leading to a slight programme-level increase.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors: Spend has continued to accelerate and delivery is on a sound footing. Market and economic conditions and other factors, including environmental, do however continue…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2028. This is primarily due to the following factors: The HIF programme spend deadline remains 31/03/28, as agreed in the revised business case in 2023.","narrativeClaimKind":null},{"id":"MHCLG_0004_2021-Q4","year":2026,"name":"HOUSING INFRASTRUCTURE FUND","department":"MHCLG","category":"Infrastructure and Construction","description":"The Housing Infrastructure Fund (HIF) provides capital funding for critical infrastructure, such as transport, utilities and site remediation, to unlock housing delivery. The programme is expected to unlock the construction of circa 255k homes.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. The rating reflects the delivery broadly in line with expectations alongside ongoing complexity in the final stages of the programme. Homes England and MHCLG have proactively managed risk across the largest and most complex Forward Fund projects, where the majority of remaining activity is concentrated. While delivery remains stable, external market, economic and environmental factors continue to impact progress at project level and require active mitigation. The programme has responded to assurance findings, implementing NISTA recommendations including revisions to delegated authority limits to streamline decision-making and further development of the risk and controls framework to reflect programme maturity. With the National Housing Delivery Fund now approved and launched, HIF will transition into a unified governance structure, strengthening oversight and ensuring consistent management of delivery, risk, cost and performance across legacy and successor activity.","startDate":"2016-12-30","endDate":"2028-03-31","scheduleNarrative":"There has been no change to the schedule for the programme.","fyBaseline":516.47,"fyForecast":470.17,"fyVariance":8.96,"varianceNarrative":"The in-year budget variance exceeds 5%, reflecting reduced close-down costs, programme delays and under-utilised contingency, alongside the withdrawal of a scheme. Delivery risk continues to be actively managed across the largest and most complex projects, where the majority of remaining HIF expenditure is concentrated.","wholeLifeCost":4250.15,"costNarrative":"The WLC has decreased by £131m, reflecting a number of material amendments across the programme and adjustments for inflation in real terms. These include project withdrawals and changes to delivery scope and timing, with some costs being deferred into later years as schemes progress. The incorporation of HIF headroom into the NHDF portfolio has also contributed to changes in future expenditure projections.","benefits":10600.36,"benefitsNarrative":"Change requests this Financial Year have had a mixture of positive and negative impacts on monetised benefits resulting in no significant changes to monetised benefits. The programme delivers benefits through enabling infrastructure (including roads, rail and schools) and the unlocking of net additional homes, alongside wider economic and regeneration impacts. Evidence gathered through the HIF Benefits Strategy is informing the approach to reporting both monetisable and non-monetisable outcomes.","themes":["Delivery & schedule","Cost & funding","Governance & assurance","Commercial & supply chain"],"evidenceExcerpt":"The SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. The rating reflects the delivery broadly in line with expectations alongside ongoing complexity in the final stages of the programme. Homes England and MHCLG have proactively managed risk across the largest and most complex Forward Fund projects, where the majority of…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"There has been no change to the schedule for the programme.","narrativeClaimKind":null}],"previous":{"id":"MHCLG_0004_2021-Q4","year":2025,"name":"HOUSING INFRASTRUCTURE FUND","department":"MHCLG","category":"Infrastructure and Construction","description":"The Housing Infrastructure Fund (HIF) provides funding for infrastructure projects which, once delivered, will unlock housing capacity, mainly in areas of high demand. The programme is expected to unlock the construction of circa 255k homes.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors: Spend has continued to accelerate and delivery is on a sound footing. Market and economic conditions and other factors, including environmental, do however continue to impact delivery of individual projects, and these are being managed carefully. To maintain delivery confidence, we are closely monitoring programme headroom, to avoid a programme-level under- or over-spend and unnecessary loss of unlocked housing. We are also implementing recommendations from HIF’s most recent NISTA annual review, including further streamlining decision-making processes and updating our forecasting model to more accurately reflect the maturity of the programme.","startDate":"2016-12-30","endDate":"2028-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2028. This is primarily due to the following factors: The HIF programme spend deadline remains 31/03/28, as agreed in the revised business case in 2023.","fyBaseline":744.8,"fyForecast":740.0,"fyVariance":0.64,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":4263.7,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 4257 to 4263.7. This is primarily due to the following factors: Since the 2023 business case reset, there has been a slight increase in total forecast RDEL and CDEL spend, including an adjustment in legal and evaluation costs.","benefits":11700.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 11600 to 11700. This is primarily due to the following factors: Programme monetised benefits estimates are reviewed periodically to account for projects descoping or withdrawing from the programme on deliverability grounds. Most significant project changes and withdrawals were factored into the end-FY 23/24 estimate. Change requests since then have been relatively minor, with a mixture of positive and negative impacts on monetised benefits leading to a slight programme-level increase.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors: Spend has continued to accelerate and delivery is on a sound footing. Market and economic conditions and other factors, including environmental, do however continue…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2028. This is primarily due to the following factors: The HIF programme spend deadline remains 31/03/28, as agreed in the revised business case in 2023.","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":0,"attentionScore":21,"attentionReasons":["Current published delivery confidence is Amber","In-year forecast variance is +9.0%"]},{"id":"DFT_0439_2425-Q3","year":2026,"name":"PUBLIC OWNERSHIP TRANSITION PROGRAMME","department":"DFT","category":"Government Transformation and Service Delivery","description":"The Programme will transfer the remaining privately operated passenger rail contracts, for which the Secretary of State is responsible, into public ownership. These will be transferred to DfT Operator Limited (DFTO) whose functions will eventually be integrated into Great British Railways (GBR). The aim is to complete all transfers into public ownership by the end of 2027. Richard Goodman served as interim SRO from 24 December 2025 to 31 March 2026 during the programme’s transfer from DfT to DFTO. Alex Hynes assumed SRO responsibilities from 1 April 2026.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 2024/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating for 2025/26 Q4 has remained at Amber. Good progress continues to be made with South Western Railway, c2c, Greater Anglia and West Midlands Trains successfully transferred into public ownership. Work is progressing well on the Govia Thameslink Railway transfer scheduled for 31 May 2026, with further transfers scheduled (including Chiltern Railways on 20 September 2026 and Great Western Railway on 13 December 2026). This indicates that the Programme has a good chance of successful completion, although larger, more complex transfers remain.","startDate":"2024-12-04","endDate":"2027-12-31","scheduleNarrative":"The programme is progressing on time and as planned; the services of South Western Railway, c2c, Greater Anglia and West Midlands have successfully transferred into public ownership. The SoS has also issued expiry notices confirming the planned transfer of Govia Thameslink Railway (GTR) services on 31 May 2026, Chiltern services on 20 September 2026 and Great Western Railway services on 13 December 2026. Work on the GTR transfer is well advanced with work on Chiltern now progressing to plan. Decisions regarding the timing of the final three transfers will be made by the SoS later with the full programme of transitions into public ownership expected to be completed by the end of 2027. Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remains the same. There is a risk that a Train Operating Company may default, which could necessitate unplanned transfers and exacerbate capacity and capability pressures across the department and DFTO. While the likelihood of default is considered low and the risk is regarded as manageable, the programme continues to plan for this. The transfer of DFT Rail Services Group staff to DFTO took place at the end of March 2026.","fyBaseline":9.77,"fyForecast":10.73,"fyVariance":9.81,"varianceNarrative":"The budget variance exceeds 5% due to the delivery of the scheduled volume of work for the 2025/26 financial year, in order to meet the programme’s public commitments and ensure the transfers are delivered safely and effectively.","wholeLifeCost":36.6,"costNarrative":"Compared to Q4 of the 2024/25 financial year, the project’s departmentally agreed Whole Life Cost at Q4 of 2025/26 (measured in £m) has remained the same.","benefits":110.0,"benefitsNarrative":"Under public ownership, passenger services will be operated in the interests of passengers rather than shareholders. This represents a vital step towards wider reform, bringing track and train together under Great British Railways (GBR). Public ownership will save taxpayers up to an estimated £110-150 million every year on fees paid to privately-owned train operating companies, once all services currently delivered under contract with the Department have transferred. The Government is taking the railways into public ownership at the lowest reasonable cost to the taxpayer, enabling long-overdue improvements to make everyday journeys easier. Each transfer will involve some mobilisation and due diligence costs. These costs are expected to be a small fraction of the £110-150m per year in fees to private operators that will no longer have to be funded by the taxpayer once all franchised services are back in public ownership.","themes":["Cost & funding","Delivery & schedule","Workforce & capability","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 2024/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating for 2025/26 Q4 has remained at Amber. Good progress continues to be made with South Western Railway, c2c, Greater Anglia and West Midlands Trains successfully transferred into public ownership. Work is progressing well on the Govia Thameslink Railway transfer…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The programme is progressing on time and as planned; the services of South Western Railway, c2c, Greater Anglia and West Midlands have successfully transferred into public ownership. The SoS has also issued expiry notices confirming the planned transfer of Govia Thameslink Railway (GTR) services on 31 May 2026, Chiltern services on 20 September 2026 and Great Western Railway services on 13 December 2026. Work on the GTR transfer is well advanced with work on Chiltern now progressing to plan. Decisions regarding the timing of the final three transfers will be made by the SoS later with the full programme of transitions into public ownership expected to be completed by the end of 2027. Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remains the same. There is a risk that a Train Operating Company may default, which could necessitate unplanned transfers and exacerbate capacity and capability pressures across the department and DFTO. While the likelihood of default is considered low and the risk is regarded as manageable, the programme continues to plan for this. The transfer of DFT Rail Services Group staff to DFTO took place at the end of March 2026.","narrativeClaimKind":null,"history":[{"id":"DFT_0439_2425-Q3","year":2025,"name":"PUBLIC OWNERSHIP TRANSITION PROGRAMME","department":"DfT","category":"Government Transformation and Service Delivery","description":"The Programme will transfer into public ownership the remaining privately operated passenger rail contracts that are the responsibility of the Secretary of State. These will be transferred to DfT Operator Limited – previously known as DfT Operator of Last Resort Holdings Limited (DOHL) – whose functions will eventually be integrated into Great British Railways (GBR). The aim is to complete all transfers into public ownership by the end of 2027.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER. This is due to‚ The programme agreed with the IPA/NISTA IQA of Amber and has commenced implementing the recommendations contained in the report.","startDate":null,"endDate":"2027-12-31","scheduleNarrative":"The project's end-date at 24/25-Q4 is scheduled to be 31/12/2027. This is primarily due to the following factors‚ On 4 December 2024, the government launched the rail public ownership programme and announced the first services to transfer into public ownership following Royal Assent of the Passenger Railway Services (Public Ownership) Bill. South Western Railway’s services were the first to transfer on 25 May 2025 followed by c2c’s services on 20 July 2025. Greater Anglia’s services will then transfer on 12 October 2025. Following the transfer of Greater Anglia’s services, DfT expects the programme will continue with one operator’s services transferring roughly every 3 months. The transfer of passenger services operated under contracts with DfT is expected to complete by the end of 2027.","fyBaseline":3.9,"fyForecast":5.5,"fyVariance":41.03,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The programme registered an underspend in the 2024/25 financial year, in part as a result of not needing to activate additional legal support which was build into the baseline.","wholeLifeCost":36.6,"costNarrative":"The project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) is 36. This is primarily due to the following factors‚","benefits":0.0,"benefitsNarrative":"The project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) is 0. This is primarily due to the following factors‚ The Public Ownership Programme serves as an enabler for wider rail reform benefits. Where there are monetised benefits that the programme is specifically responsible for, these will be identified and monitored.","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER. This is due to‚ The programme agreed with the IPA/NISTA IQA of Amber and has commenced implementing the recommendations contained in the report. The project's end-date at 24/25-Q4 is scheduled to be 31/12/2027. This is primarily due to the following factors‚…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 24/25-Q4 is scheduled to be 31/12/2027. This is primarily due to the following factors‚ On 4 December 2024, the government launched the rail public ownership programme and announced the first services to transfer into public ownership following Royal Assent of the Passenger Railway Services (Public Ownership) Bill. South Western Railway’s services were the first to transfer on 25 May 2025 followed by c2c’s services on 20 July 2025. Greater Anglia’s services will then transfer on 12 October 2025. Following the transfer of Greater Anglia’s services, DfT expects the programme will continue with one operator’s services transferring roughly every 3 months. The transfer of passenger services operated under contracts with DfT is expected to complete by the end of 2027.","narrativeClaimKind":null},{"id":"DFT_0439_2425-Q3","year":2026,"name":"PUBLIC OWNERSHIP TRANSITION PROGRAMME","department":"DFT","category":"Government Transformation and Service Delivery","description":"The Programme will transfer the remaining privately operated passenger rail contracts, for which the Secretary of State is responsible, into public ownership. These will be transferred to DfT Operator Limited (DFTO) whose functions will eventually be integrated into Great British Railways (GBR). The aim is to complete all transfers into public ownership by the end of 2027. Richard Goodman served as interim SRO from 24 December 2025 to 31 March 2026 during the programme’s transfer from DfT to DFTO. Alex Hynes assumed SRO responsibilities from 1 April 2026.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 2024/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating for 2025/26 Q4 has remained at Amber. Good progress continues to be made with South Western Railway, c2c, Greater Anglia and West Midlands Trains successfully transferred into public ownership. Work is progressing well on the Govia Thameslink Railway transfer scheduled for 31 May 2026, with further transfers scheduled (including Chiltern Railways on 20 September 2026 and Great Western Railway on 13 December 2026). This indicates that the Programme has a good chance of successful completion, although larger, more complex transfers remain.","startDate":"2024-12-04","endDate":"2027-12-31","scheduleNarrative":"The programme is progressing on time and as planned; the services of South Western Railway, c2c, Greater Anglia and West Midlands have successfully transferred into public ownership. The SoS has also issued expiry notices confirming the planned transfer of Govia Thameslink Railway (GTR) services on 31 May 2026, Chiltern services on 20 September 2026 and Great Western Railway services on 13 December 2026. Work on the GTR transfer is well advanced with work on Chiltern now progressing to plan. Decisions regarding the timing of the final three transfers will be made by the SoS later with the full programme of transitions into public ownership expected to be completed by the end of 2027. Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remains the same. There is a risk that a Train Operating Company may default, which could necessitate unplanned transfers and exacerbate capacity and capability pressures across the department and DFTO. While the likelihood of default is considered low and the risk is regarded as manageable, the programme continues to plan for this. The transfer of DFT Rail Services Group staff to DFTO took place at the end of March 2026.","fyBaseline":9.77,"fyForecast":10.73,"fyVariance":9.81,"varianceNarrative":"The budget variance exceeds 5% due to the delivery of the scheduled volume of work for the 2025/26 financial year, in order to meet the programme’s public commitments and ensure the transfers are delivered safely and effectively.","wholeLifeCost":36.6,"costNarrative":"Compared to Q4 of the 2024/25 financial year, the project’s departmentally agreed Whole Life Cost at Q4 of 2025/26 (measured in £m) has remained the same.","benefits":110.0,"benefitsNarrative":"Under public ownership, passenger services will be operated in the interests of passengers rather than shareholders. This represents a vital step towards wider reform, bringing track and train together under Great British Railways (GBR). Public ownership will save taxpayers up to an estimated £110-150 million every year on fees paid to privately-owned train operating companies, once all services currently delivered under contract with the Department have transferred. The Government is taking the railways into public ownership at the lowest reasonable cost to the taxpayer, enabling long-overdue improvements to make everyday journeys easier. Each transfer will involve some mobilisation and due diligence costs. These costs are expected to be a small fraction of the £110-150m per year in fees to private operators that will no longer have to be funded by the taxpayer once all franchised services are back in public ownership.","themes":["Cost & funding","Delivery & schedule","Workforce & capability","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 2024/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating for 2025/26 Q4 has remained at Amber. Good progress continues to be made with South Western Railway, c2c, Greater Anglia and West Midlands Trains successfully transferred into public ownership. Work is progressing well on the Govia Thameslink Railway transfer…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The programme is progressing on time and as planned; the services of South Western Railway, c2c, Greater Anglia and West Midlands have successfully transferred into public ownership. The SoS has also issued expiry notices confirming the planned transfer of Govia Thameslink Railway (GTR) services on 31 May 2026, Chiltern services on 20 September 2026 and Great Western Railway services on 13 December 2026. Work on the GTR transfer is well advanced with work on Chiltern now progressing to plan. Decisions regarding the timing of the final three transfers will be made by the SoS later with the full programme of transitions into public ownership expected to be completed by the end of 2027. Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remains the same. There is a risk that a Train Operating Company may default, which could necessitate unplanned transfers and exacerbate capacity and capability pressures across the department and DFTO. While the likelihood of default is considered low and the risk is regarded as manageable, the programme continues to plan for this. The transfer of DFT Rail Services Group staff to DFTO took place at the end of March 2026.","narrativeClaimKind":null}],"previous":{"id":"DFT_0439_2425-Q3","year":2025,"name":"PUBLIC OWNERSHIP TRANSITION PROGRAMME","department":"DfT","category":"Government Transformation and Service Delivery","description":"The Programme will transfer into public ownership the remaining privately operated passenger rail contracts that are the responsibility of the Secretary of State. These will be transferred to DfT Operator Limited – previously known as DfT Operator of Last Resort Holdings Limited (DOHL) – whose functions will eventually be integrated into Great British Railways (GBR). The aim is to complete all transfers into public ownership by the end of 2027.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER. This is due to‚ The programme agreed with the IPA/NISTA IQA of Amber and has commenced implementing the recommendations contained in the report.","startDate":null,"endDate":"2027-12-31","scheduleNarrative":"The project's end-date at 24/25-Q4 is scheduled to be 31/12/2027. This is primarily due to the following factors‚ On 4 December 2024, the government launched the rail public ownership programme and announced the first services to transfer into public ownership following Royal Assent of the Passenger Railway Services (Public Ownership) Bill. South Western Railway’s services were the first to transfer on 25 May 2025 followed by c2c’s services on 20 July 2025. Greater Anglia’s services will then transfer on 12 October 2025. Following the transfer of Greater Anglia’s services, DfT expects the programme will continue with one operator’s services transferring roughly every 3 months. The transfer of passenger services operated under contracts with DfT is expected to complete by the end of 2027.","fyBaseline":3.9,"fyForecast":5.5,"fyVariance":41.03,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The programme registered an underspend in the 2024/25 financial year, in part as a result of not needing to activate additional legal support which was build into the baseline.","wholeLifeCost":36.6,"costNarrative":"The project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) is 36. This is primarily due to the following factors‚","benefits":0.0,"benefitsNarrative":"The project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) is 0. This is primarily due to the following factors‚ The Public Ownership Programme serves as an enabler for wider rail reform benefits. Where there are monetised benefits that the programme is specifically responsible for, these will be identified and monitored.","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER. This is due to‚ The programme agreed with the IPA/NISTA IQA of Amber and has commenced implementing the recommendations contained in the report. The project's end-date at 24/25-Q4 is scheduled to be 31/12/2027. This is primarily due to the following factors‚…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 24/25-Q4 is scheduled to be 31/12/2027. This is primarily due to the following factors‚ On 4 December 2024, the government launched the rail public ownership programme and announced the first services to transfer into public ownership following Royal Assent of the Passenger Railway Services (Public Ownership) Bill. South Western Railway’s services were the first to transfer on 25 May 2025 followed by c2c’s services on 20 July 2025. Greater Anglia’s services will then transfer on 12 October 2025. Following the transfer of Greater Anglia’s services, DfT expects the programme will continue with one operator’s services transferring roughly every 3 months. The transfer of passenger services operated under contracts with DfT is expected to complete by the end of 2027.","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":0,"attentionScore":21,"attentionReasons":["Current published delivery confidence is Amber","In-year forecast variance is +9.8%"]},{"id":"BEIS_0013_2021-Q4","year":2026,"name":"PUBLIC SECTOR DECARBONISATION SCHEME","department":"DESNZ","category":"Infrastructure and Construction","description":"The Public Sector Decarbonisation Scheme has been in operation since September 2020, providing capital grant funding to support heat decarbonisation and energy efficiency improvements in public sector buildings. Its core aim is to reduce direct carbon emissions from the public sector. These reductions will contribute to the UK’s Carbon Budgets 4, 5, and 6, playing a vital role in achieving the UKs Net Zero targets.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Overall delivery of live projects is progressing well. Although grant recipients continue to experience pressures from, for example, higher-than-expected costs and longer than anticipated timelines for delivery, projects are delivering at above our previously assumed level. As a result, delivery outcomes are looking promising. Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment rating at 25/26 Q4 remained at AMBER.","startDate":"2020-07-08","endDate":"2028-03-31","scheduleNarrative":"The project is due to conclude on 31 March 2028, in line with the latest approved Business Case. In 2025, Ministers took the decision not to support further investment in PSDS, and no additional funding will be allocated.","fyBaseline":405.44,"fyForecast":436.74,"fyVariance":7.72,"varianceNarrative":"Project delivery losses in FY 2025/26 were lower than modelled, with attrition from abandonments and rescopes below overprogramming assumptions, resulting in a c. 7% CDEL overspend.","wholeLifeCost":3759.0,"costNarrative":"In June 2025, the PSDS budget was reduced as part of Phase 2 of the 2025 Spending Review, with impacts on funding in FY 2026/27 and 2027/28.","benefits":5893.84,"benefitsNarrative":"Modelled baseline benefits were revised to account for the reduction of budget in FY 2026/27 and 2027/28.","themes":["Delivery & schedule","Cost & funding","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Overall delivery of live projects is progressing well. Although grant recipients continue to experience pressures from, for example, higher-than-expected costs and longer than anticipated timelines for delivery, projects are delivering at above our previously assumed level. As a result, delivery outcomes are looking promising. Compared to financial year…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project is due to conclude on 31 March 2028, in line with the latest approved Business Case. In 2025, Ministers took the decision not to support further investment in PSDS, and no additional funding will be allocated.","narrativeClaimKind":null,"history":[{"id":"BEIS_0013_2021-Q4","year":2021,"name":"Public Sector Decarbonisation Scheme (PSDS)","department":"BEIS","category":"Infrastructure and Construction","description":"The Public Sector Decarbonisation Scheme (PSDS) provides grants for public sector bodies to fund heat decarbonisation and energy efficiency measures.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber.This is primarily due to the following factors: Initial monitoring data suggest that Phase 1 of the Public Sector Decarbonisation Scheme has exceeded its carbon emission reduction objective. There was very strong demand for Phase 1 and expected to be very strong demand for Phase 2 of the Scheme. I will continue to closely monitor the implementation of both Phases. The main risk to delivery is the uncertain impact of the ongoing COVID pandemic.","startDate":"2020-07-08","endDate":"2022-03-31","scheduleNarrative":"The project end-date is 31 March 2022. This is primarily due to the following factors: The project is due to end by 31 March 2022, in line with its budget allocation from the latest Spending Review.","fyBaseline":641.14,"fyForecast":630.36,"fyVariance":-2.0,"varianceNarrative":"The budget variance is less than or equal to 5%. N/A - budget variance is inferior or equal to 5%","wholeLifeCost":1116.14,"costNarrative":"The projects Baseline Whole Life Cost is �1116.14m. This is primarily due to the following factors: The large majority of the Baseline Whole Life Cost consists of grant funding for public sector organisations.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber.This is primarily due to the following factors: Initial monitoring data suggest that Phase 1 of the Public Sector Decarbonisation Scheme has exceeded its carbon emission reduction objective. There was very strong demand for Phase 1 and expected to be very strong demand for…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project end-date is 31 March 2022. This is primarily due to the following factors: The project is due to end by 31 March 2022, in line with its budget allocation from the latest Spending Review.","narrativeClaimKind":null},{"id":"BEIS_0013_2021-Q4","year":2022,"name":"Public Sector Decarbonisation Scheme (PSDS)","department":"BEIS","category":"Infrastructure and Construction","description":"A capital funding programme for heat decarbonisation and energy efficiency improvements in public sector organisations. The PSDS has received funding for three phases. Phase 1 consists of £1bn of funding to be delivered over 2020/21 and 2021/22. Phase 2 consists of £75m of funding to be delivered over the 2021/22 financial year. Phase 3 consists of £1.425 billion funding to be delivered over three years between 2022/23 and 2024/25.Funding for further phases of the Scheme will be determined through the Spending Review process. Funding for Phases 1 and 2 of the Scheme ended on 31 March 2022.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 remained at Amber £1.075 billion has been allocated for Phases 1 and 2 of the Scheme. No further funding will be allocated through these phases. Funding for Phase 3 of the Scheme has been confirmed through the 2021 Spending Review. Close to the full budget for the first year of Phase 3 has been allocated, to allow grant recipients to start drawing down funding from April 2022. Delivery confidence remains at amber due to the impact of the Covid-19 pandemic on Phase 1 and 2 projects.","startDate":"2020-07-08","endDate":"2025-03-31","scheduleNarrative":"Compared to 2021-Q4, your project end-date increased from 31 MAR 2022 to 31 MAR 2025 . This is primarily due to the following factors: The Scheme has 3 phases that are currently in delivery. We take a hybrid approach to project planning, leaning mostly on waterfall methodology but incorporating insights from previous phases into subsequent phases, iterating with stakeholders and others through the scheme design process. All three phases of the scheme are delivered through Salix Finance - public sector organisations apply to Salix for grant funding to complete heat decarbonisation and energy efficiency projects, Salix then assesses these bids, issues grant offer letters to successful applicants, monitors the delivery of the resulting portfolio of grant-funded projects, and issues grant payments.","fyBaseline":503.89,"fyForecast":503.89,"fyVariance":0.0,"varianceNarrative":"The budget variance is inferior or equal to 5%. The CDEL baseline costs are based on the confirmed budgets for the PSDS. The CDEL budget is £600m in 2020/21 and £475m in each of 2021/22, 2022/23, 2023/23 and 2024/25. The budget for future phases of the Scheme will be determined through the Spending Review process. The 2020/21 and 2021/22 RDEL budget included funding for the Public Sector Low Carbon Skills Fund (LCSF), funding for Salix Finance Ltd to deliver the PSDS and other programme costs (eg for evaluation contractor). The RDEL figure for 21/22 forecast is 23.77","wholeLifeCost":2570.0,"costNarrative":"Compared to2021-Q4, the projects Baseline Whole Life Cost increased from 1116.14 (£m) to 2570.03 (£m). This is primarily due to the following factors: £1.425 billion of funding for Phase 3 of the PSDS was allocated via the Autumn Budget and Spending Review 2021. This will provide £475 million of funding for three financial years from 2022/23 to 2024/25.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 remained at Amber £1.075 billion has been allocated for Phases 1 and 2 of the Scheme. No further funding will be allocated through these phases. Funding for Phase 3 of the Scheme has been confirmed through the 2021 Spending Review.…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to 2021-Q4, your project end-date increased from 31 MAR 2022 to 31 MAR 2025 . This is primarily due to the following factors: The Scheme has 3 phases that are currently in delivery. We take a hybrid approach to project planning, leaning mostly on waterfall methodology but incorporating insights from previous phases into subsequent phases, iterating with stakeholders and others through the scheme design process. All three phases of the scheme are delivered through Salix Finance - public sector organisations apply to Salix for grant funding to complete heat decarbonisation and energy efficiency projects, Salix then assesses these bids, issues grant offer letters to successful applicants, monitors the delivery of the resulting portfolio of grant-funded projects, and issues grant payments.","narrativeClaimKind":null},{"id":"BEIS_0013_2021-Q4","year":2023,"name":"Public Sector Decarbonisation Scheme (PSDS)","department":"DESNZ","category":"Infrastructure and Construction","description":"A capital funding programme for heat decarbonisation and energy efficiency improvements in public sector organisations. The PSDS has received funding for three phases. Phase 1 consisted of 1bn of funding which was delivered over 2020/21 and 2021/22. Phase 2 consisted of 75m of funding which was delivered over the 2021/22 financial year. Phase 3 consists of 1.425 billion funding to be delivered over three years between 2022/23 and 2024/25. Funding for further phases of the Scheme will be determined through the Spending Review process. Funding for Phases 1 and 2 of the Scheme ended on 31 March 2022.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. SRO DCA remains Amber. Although the key milestones for year 1 of PSDS Phase 3 has been successfully delivered, the outcome for year 1 in terms of spend and technology deployed remains uncertain. We know that projects are experiencing headwinds from higher than expected costs and tight supply chains linked to wider market responses to the ongoing energy situation.","startDate":"2020-07-08","endDate":"2025-03-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2025-03-31. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2025-03-31. This is primarily due to the following factors. The project is due to conclude on 31/03/2025 in line with available funding secured as part of the Autumn budget and 2021 spending review. The project end date may shift as funding for further phases of the scheme are determined through the next spending review process.","fyBaseline":504.23,"fyForecast":504.23,"fyVariance":0.0,"varianceNarrative":"The budget variance is inferior or equal to 5%. The forecast budget variance is less than or equal to 5% though underspend arising from late project abandonment and scope changes tends to emerge very late in the year so risks remain that this will increase once full year data is available","wholeLifeCost":2598.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 increased from 2570m. to 2598m. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 increased from 2570m. to 2598m. This is primarily due to the following factors. The Whole Life Costs increased due to the addition of resource departmental expenditure limit figures for FY 2022/23 following confirmation of budget allocation.","benefits":5324.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 5324m. The scheme benefits are monetised as far as possible. The monetised benefits are i) reductions in carbon emissions as a result of changes to fuel consumption, ii) air quality improvements through decreased burning of fossil fuels, and iii) changes to energy consumption. The benefits are monetised using the most recent available Green Book Assumptions.The benefits associated with the scheme continue beyond delivery as projects delivered under the PSDS result in continued carbon emission reductions.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. SRO DCA remains Amber. Although the key milestones for year 1 of PSDS Phase 3 has been successfully delivered, the outcome for year 1 in terms of spend and technology…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2025-03-31. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2025-03-31. This is primarily due to the following factors. The project is due to conclude on 31/03/2025 in line with available funding secured as part of the Autumn budget and 2021 spending review. The project end date may shift as funding for further phases of the scheme are determined through the next spending review process.","narrativeClaimKind":null},{"id":"BEIS_0013_2021-Q4","year":2024,"name":"Public Sector Decarbonisation Scheme (PSDS)","department":"DESNZ","category":"Infrastructure and Construction","description":"The Public Sector Decarbonisation Scheme has been running since September 2020. It provides capital funding for heat decarbonisation and energy efficiency projects in public sector buildings in England. The PSDS's primary objective is to reduce direct carbon emissions from the public sector. These non-traded emissions savings will contribute to Carbon Budgets 4, 5 and 6, and will help the UK meet its Net Zero targets. Funding for phases 1 and 2 of the scheme ended on 31 March 2022. Phase 3 is currently in delivery and funding for Phase 4 has been secured following the government's announcement of 6bn for energy efficiency policies making available funding for public sector decarbonisation for 25/26 to 27/28. Phase 4 is subject to business case approval.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. Although the key milestones for year 1 and 2 of PSDS Phase 3 have been successfully delivered, the outcome in terms of spend and technology deployed remains uncertain. We know that projects are experiencing headwinds from higher than expected costs due to inflation.","startDate":"2020-07-08","endDate":"2025-03-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2025-03-31. This is primarily due to the following factors. The project is due to conclude on 31/03/2025 in line with our latest approved business case. The project end date will shift by a year (to March 2026) when we receive approval via the business case process for the next Phase of the scheme.","fyBaseline":461.04,"fyForecast":461.04,"fyVariance":0.0,"varianceNarrative":"The budget variance is inferior or equal to 5%.","wholeLifeCost":2565.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 decreased from 2598m. to 2565m. This is primarily due to the following factors. The Whole Life Costs decreased due to readjustment of baseline following PSDS budget reductions and departmental budget transfers.","benefits":5076.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 2324-Q4 decreased from 5324m. to 5076m. The scheme benefits are monetised as far as possible. The monetised benefits are i) reductions in carbon emissions as a result of changes to fuel consumption, ii) air quality improvements through decreased burning of fossil fuels, and iii) changes to energy consumption. The benefits are monetised using the most recent available Green Book Assumptions. The benefits associated with the scheme continue beyond delivery as projects delivered under the PSDS result in continued carbon emission reductions.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. Although the key milestones for year 1 and 2 of PSDS Phase 3 have been successfully delivered, the outcome in terms of spend and technology deployed remains…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2025-03-31. This is primarily due to the following factors. The project is due to conclude on 31/03/2025 in line with our latest approved business case. The project end date will shift by a year (to March 2026) when we receive approval via the business case process for the next Phase of the scheme.","narrativeClaimKind":null},{"id":"BEIS_0013_2021-Q4","year":2025,"name":"PUBLIC SECTOR DECARBONISATION SCHEME","department":"DESNZ","category":"Infrastructure and Construction","description":"The Public Sector Decarbonisation Scheme has been in operation since September 2020, providing capital funding to support heat decarbonisation and energy efficiency improvements in public sector buildings. Its core aim is to reduce direct carbon emissions from the public sector. These reductions will contribute to the UK’s Carbon Budgets 4, 5, and 6, playing a vital role in achieving the UKs Net Zero targets.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors: while overall delivery of live projects is progressing well, grant recipients continue to experience pressures from, for instance, higher-than-expected costs and longer than anticipated timelines for delivery implementation. As a result, the outcomes regarding technologies deployed remain uncertain.","startDate":"2020-07-08","endDate":"2028-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2025 to 31/03/2028. This is primarily due to the following factors: the Phase 4 Full Business Case, covering delivery through to FY 2027/28, was approved and at Autumn Budget 2024 additional funding was secured for financial years 2025/26 to 2027/28. Phase 4 of the scheme was launched in Autumn 2024 with grant recipients able to commence grant spend from 1 April 2025.","fyBaseline":433.8,"fyForecast":404.9,"fyVariance":6.66,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors: higher-than-expected project delivery losses were experienced in financial year 2024/25, driven by an increase in project scope reductions and abandonments as a result of various delivery challenges. This resulted in an underspend that exceeded the amount by which we had overprogrammed, giving rise to unclaimed budget.","wholeLifeCost":3836.29,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 2565 to 3836. This is primarily due to the following factors: funding for the second year of Phase 3c, and Phase 4, of the Public Sector Decarbonisation Scheme was secured and included in the return. This funding will support delivery across financial years 2025/26 to 2027/28.","benefits":8040.01,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 5076 to 8040. This is primarily due to the following factors: modelled baseline benefits were revised to account for inclusion of funding for the second year of Phase 3c, and Phase 4, in the return.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors: while overall delivery of live projects is progressing well, grant recipients continue to experience pressures from, for instance, higher-than-expected costs and…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2025 to 31/03/2028. This is primarily due to the following factors: the Phase 4 Full Business Case, covering delivery through to FY 2027/28, was approved and at Autumn Budget 2024 additional funding was secured for financial years 2025/26 to 2027/28. Phase 4 of the scheme was launched in Autumn 2024 with grant recipients able to commence grant spend from 1 April 2025.","narrativeClaimKind":null},{"id":"BEIS_0013_2021-Q4","year":2026,"name":"PUBLIC SECTOR DECARBONISATION SCHEME","department":"DESNZ","category":"Infrastructure and Construction","description":"The Public Sector Decarbonisation Scheme has been in operation since September 2020, providing capital grant funding to support heat decarbonisation and energy efficiency improvements in public sector buildings. Its core aim is to reduce direct carbon emissions from the public sector. These reductions will contribute to the UK’s Carbon Budgets 4, 5, and 6, playing a vital role in achieving the UKs Net Zero targets.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Overall delivery of live projects is progressing well. Although grant recipients continue to experience pressures from, for example, higher-than-expected costs and longer than anticipated timelines for delivery, projects are delivering at above our previously assumed level. As a result, delivery outcomes are looking promising. Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment rating at 25/26 Q4 remained at AMBER.","startDate":"2020-07-08","endDate":"2028-03-31","scheduleNarrative":"The project is due to conclude on 31 March 2028, in line with the latest approved Business Case. In 2025, Ministers took the decision not to support further investment in PSDS, and no additional funding will be allocated.","fyBaseline":405.44,"fyForecast":436.74,"fyVariance":7.72,"varianceNarrative":"Project delivery losses in FY 2025/26 were lower than modelled, with attrition from abandonments and rescopes below overprogramming assumptions, resulting in a c. 7% CDEL overspend.","wholeLifeCost":3759.0,"costNarrative":"In June 2025, the PSDS budget was reduced as part of Phase 2 of the 2025 Spending Review, with impacts on funding in FY 2026/27 and 2027/28.","benefits":5893.84,"benefitsNarrative":"Modelled baseline benefits were revised to account for the reduction of budget in FY 2026/27 and 2027/28.","themes":["Delivery & schedule","Cost & funding","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Overall delivery of live projects is progressing well. Although grant recipients continue to experience pressures from, for example, higher-than-expected costs and longer than anticipated timelines for delivery, projects are delivering at above our previously assumed level. As a result, delivery outcomes are looking promising. Compared to financial year…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project is due to conclude on 31 March 2028, in line with the latest approved Business Case. In 2025, Ministers took the decision not to support further investment in PSDS, and no additional funding will be allocated.","narrativeClaimKind":null}],"previous":{"id":"BEIS_0013_2021-Q4","year":2025,"name":"PUBLIC SECTOR DECARBONISATION SCHEME","department":"DESNZ","category":"Infrastructure and Construction","description":"The Public Sector Decarbonisation Scheme has been in operation since September 2020, providing capital funding to support heat decarbonisation and energy efficiency improvements in public sector buildings. Its core aim is to reduce direct carbon emissions from the public sector. These reductions will contribute to the UK’s Carbon Budgets 4, 5, and 6, playing a vital role in achieving the UKs Net Zero targets.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors: while overall delivery of live projects is progressing well, grant recipients continue to experience pressures from, for instance, higher-than-expected costs and longer than anticipated timelines for delivery implementation. As a result, the outcomes regarding technologies deployed remain uncertain.","startDate":"2020-07-08","endDate":"2028-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2025 to 31/03/2028. This is primarily due to the following factors: the Phase 4 Full Business Case, covering delivery through to FY 2027/28, was approved and at Autumn Budget 2024 additional funding was secured for financial years 2025/26 to 2027/28. Phase 4 of the scheme was launched in Autumn 2024 with grant recipients able to commence grant spend from 1 April 2025.","fyBaseline":433.8,"fyForecast":404.9,"fyVariance":6.66,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors: higher-than-expected project delivery losses were experienced in financial year 2024/25, driven by an increase in project scope reductions and abandonments as a result of various delivery challenges. This resulted in an underspend that exceeded the amount by which we had overprogrammed, giving rise to unclaimed budget.","wholeLifeCost":3836.29,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 2565 to 3836. This is primarily due to the following factors: funding for the second year of Phase 3c, and Phase 4, of the Public Sector Decarbonisation Scheme was secured and included in the return. This funding will support delivery across financial years 2025/26 to 2027/28.","benefits":8040.01,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 5076 to 8040. This is primarily due to the following factors: modelled baseline benefits were revised to account for inclusion of funding for the second year of Phase 3c, and Phase 4, in the return.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors: while overall delivery of live projects is progressing well, grant recipients continue to experience pressures from, for instance, higher-than-expected costs and…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2025 to 31/03/2028. This is primarily due to the following factors: the Phase 4 Full Business Case, covering delivery through to FY 2027/28, was approved and at Autumn Budget 2024 additional funding was secured for financial years 2025/26 to 2027/28. Phase 4 of the scheme was launched in Autumn 2024 with grant recipients able to commence grant spend from 1 April 2025.","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":0,"attentionScore":21,"attentionReasons":["Current published delivery confidence is Amber","In-year forecast variance is +7.7%"]},{"id":"DFE_0496_2526-Q1","year":2026,"name":"School-based nurseries","department":"DFE","category":"Infrastructure and Construction","description":"The school-based nurseries programme was established in August 2024 and is already delivering on our commitment to create tens of thousands of places in school-based nurseries, helping more families access funded childcare and giving children the best start in life. The programme is already delivering 300 new or expanded SBNs through phase 1 of the programme, providing funding directly to schools (£37m CDEL). The programme has secured funding (£367m CDEL) at the Spending Review to continue the programme in further phases. Phase 2 is also providing funding directly to 331 schools to open new or expanded SBNs during academic year 2026-27. In phase 3 local authorities will be invited to develop multi-year funding proposals to deliver SBNs between 2027-30, with places available from September 2027.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The programme’s Confidence Assessment is Amber. The programme has made strong progress this year, with the successful launch of Phase 1 with it's £37m of funding, delivering over two thirds of it's 300 projects and being on track for all Phase 1 projects to have delivered by March 2027 as planned. Phase 2 has also successfully completed announcement, assessment, moderation and launch ahead of the Easter holidays, with £45m awarded to 331 schools. Phase 3 guidance has been published and early feedback has been mostly positive, with strong Local Authority engagement through recent webinars. The pace and scale of delivery remains challenging, and we will continue to deliver against a backdrop of uncertainty on the number and scale of Phase 3 projects until late in 2026.","startDate":"2024-08-01","endDate":"2029-09-28","scheduleNarrative":"The programme's end date is 28/09/2029. This is primarily due to the following factors, the programme comprises multiple delivery phases through a mix of delivery models, with projects able to open until September 2029.","fyBaseline":35.84,"fyForecast":32.55,"fyVariance":9.19,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the first phase being a test and learn phase, and delays to the completion of some projects. This has resulted in a small underspend in 2026-27 against original forecast, though we do not anticipate the overall amount of funding we will spend in phase 1 to differ greatly from the agreed cost baseline.","wholeLifeCost":369.85,"costNarrative":"Whole life costs have been developed based on committed spending thus far through agreement at spending review.","benefits":199.33,"benefitsNarrative":"The monetised benefits for the programme has an estimate value over 60 years and are based on the positive impacts on attainment Early Years provision has at KS4 (quantified in terms of increased lifetime earnings) by creating additional nursery settings and place. The programme includes a range of non-monetised benefits, including more children from disadvantaged areas and those with special educational needs and disabilities (SEND) accessing early education, contributing to improved school readiness and early development outcomes. Parents who access and use the nursery may be able to enter the workforce, increase their part time-hours or have increased free time. The programme has taken a test and learn approach, to ensure that at each stage of expanded delivery, we have been able to deliver more efficiently and effectively, refining our approach throughout. The lessons we have learned in doing this continue to be shared with other programmes within the department to enhance outcomes.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"The programme’s Confidence Assessment is Amber. The programme has made strong progress this year, with the successful launch of Phase 1 with it's £37m of funding, delivering over two thirds of it's 300 projects and being on track for all Phase 1 projects to have delivered by March 2027 as planned. Phase 2 has also successfully completed announcement,…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The programme's end date is 28/09/2029. This is primarily due to the following factors, the programme comprises multiple delivery phases through a mix of delivery models, with projects able to open until September 2029.","narrativeClaimKind":null,"history":[{"id":"DFE_0496_2526-Q1","year":2026,"name":"School-based nurseries","department":"DFE","category":"Infrastructure and Construction","description":"The school-based nurseries programme was established in August 2024 and is already delivering on our commitment to create tens of thousands of places in school-based nurseries, helping more families access funded childcare and giving children the best start in life. The programme is already delivering 300 new or expanded SBNs through phase 1 of the programme, providing funding directly to schools (£37m CDEL). The programme has secured funding (£367m CDEL) at the Spending Review to continue the programme in further phases. Phase 2 is also providing funding directly to 331 schools to open new or expanded SBNs during academic year 2026-27. In phase 3 local authorities will be invited to develop multi-year funding proposals to deliver SBNs between 2027-30, with places available from September 2027.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The programme’s Confidence Assessment is Amber. The programme has made strong progress this year, with the successful launch of Phase 1 with it's £37m of funding, delivering over two thirds of it's 300 projects and being on track for all Phase 1 projects to have delivered by March 2027 as planned. Phase 2 has also successfully completed announcement, assessment, moderation and launch ahead of the Easter holidays, with £45m awarded to 331 schools. Phase 3 guidance has been published and early feedback has been mostly positive, with strong Local Authority engagement through recent webinars. The pace and scale of delivery remains challenging, and we will continue to deliver against a backdrop of uncertainty on the number and scale of Phase 3 projects until late in 2026.","startDate":"2024-08-01","endDate":"2029-09-28","scheduleNarrative":"The programme's end date is 28/09/2029. This is primarily due to the following factors, the programme comprises multiple delivery phases through a mix of delivery models, with projects able to open until September 2029.","fyBaseline":35.84,"fyForecast":32.55,"fyVariance":9.19,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the first phase being a test and learn phase, and delays to the completion of some projects. This has resulted in a small underspend in 2026-27 against original forecast, though we do not anticipate the overall amount of funding we will spend in phase 1 to differ greatly from the agreed cost baseline.","wholeLifeCost":369.85,"costNarrative":"Whole life costs have been developed based on committed spending thus far through agreement at spending review.","benefits":199.33,"benefitsNarrative":"The monetised benefits for the programme has an estimate value over 60 years and are based on the positive impacts on attainment Early Years provision has at KS4 (quantified in terms of increased lifetime earnings) by creating additional nursery settings and place. The programme includes a range of non-monetised benefits, including more children from disadvantaged areas and those with special educational needs and disabilities (SEND) accessing early education, contributing to improved school readiness and early development outcomes. Parents who access and use the nursery may be able to enter the workforce, increase their part time-hours or have increased free time. The programme has taken a test and learn approach, to ensure that at each stage of expanded delivery, we have been able to deliver more efficiently and effectively, refining our approach throughout. The lessons we have learned in doing this continue to be shared with other programmes within the department to enhance outcomes.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"The programme’s Confidence Assessment is Amber. The programme has made strong progress this year, with the successful launch of Phase 1 with it's £37m of funding, delivering over two thirds of it's 300 projects and being on track for all Phase 1 projects to have delivered by March 2027 as planned. Phase 2 has also successfully completed announcement,…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The programme's end date is 28/09/2029. This is primarily due to the following factors, the programme comprises multiple delivery phases through a mix of delivery models, with projects able to open until September 2029.","narrativeClaimKind":null}],"previous":null,"ratingDelta":null,"transition":"Not comparable","endDateDeltaDays":null,"attentionScore":21,"attentionReasons":["Current published delivery confidence is Amber","In-year forecast variance is +9.2%"]},{"id":"MOD_0118_1718-Q3","year":2026,"name":"CLYDE INFRASTRUCTURE","department":"MOD","category":"Military Capability","description":"The HMNB Clyde Infrastructure Programme (CIP) has been established to manage the design, delivery and transition into operational use, new build and updated infrastructure facilities at HMNB Clyde. In order to: enable the continued safe and secure operation of submarines; support the arrival of the next generation Dreadnought SSBNs; and create a single submarine centre of specialisation. With an estimated budget of £3.3Bn, it is a programme of strategic national importance that is critical to sustaining Continuous At Sea Deterrence, and the safe, sustainable and cost effective operation of the Submarine Force. The end state of the programme will be “An integrated submarine operating base at Clyde, supporting a Submarine Force that is safe, secure, sustainable and resilient, and ready to excel in operations out to 2067.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors. 1. The Delivery Confidence Assessment reflects successful completion of nine projects by the programme team up to 2025/26. 2. Despite recent successes, our resource position remains a risk. We continue to face challenges in recruiting sufficient staff and securing the level of industry support required to sustain delivery. Resourcing needs will have to be proactively managed to ensure we can maintain momentum and meet our commitments.","startDate":"2015-09-07","endDate":"2032-04-01","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme end-date at 25/26-Q4 remained the same at 01/04/2032.","fyBaseline":255.06,"fyForecast":236.11,"fyVariance":7.43,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. 1. The main driver for the 7% in-year variance is the need for the programme to work within the operational areas of HMNB Clyde and forecast sufficient flexibility to maintain capital works around operational priorities. 2. During 25/26 operational plans have affected the ability to deliver the original planned spend.","wholeLifeCost":3324.98,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally-agreed Whole Life Cost at 25/26-Q4 (measured in £m) increased from £1876.3M to £3287.2M. This is primarily due to the following factors. 1. The forecast Whole Life Costs has increased to reflect new requirements and improved understanding of the conditions of the existing infrastructures and the levels of intervention required to achieve the required programme outcomes.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Delivery & schedule","Workforce & capability","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors. 1. The Delivery Confidence Assessment reflects successful completion of nine projects by the programme team up to 2025/26. 2. Despite recent successes, our resource position remains a…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the programme end-date at 25/26-Q4 remained the same at 01/04/2032.","narrativeClaimKind":null,"history":[{"id":"MOD_0118_1718-Q3","year":2020,"name":"Clyde Infrastructure","department":"MOD","category":"Military Capability","description":"Managing the design, delivery and transition into operational use, new build and updated infrastructure facilities in HMNB Clyde (Faslane and Coulport).","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber, which has declined since last year�s Q2 1819 Amber/Green, due primarily to the following factors; - The phased transition from predominantly new build scope to a greater focus on refurbishment work of existing facilities within the operational areas of the base requiring greater integration and planning across the stakeholder community, particularly across boat maintenance and weapons programmes. - A greater understanding of existing asset condition has highlighted the fragility of some aspects of the key complex technical waterfront infrastructure which together with greater operational demands on facilities has lead to uncertainty on the volume of intervention required and the ability to deliver within programme time and cost parameters. Since the Q2 1920 (30th September 2019) Amber IPA DCA, the following non-project operating environment activities have impacted the original Q2 IPA DCA; - The impact of COVID19 on the delivery of the programme is currently being assessed, noting that all non critical onsite projects ceased on 24th March 20 to moderate viral transmission and mitigate the risk to CASD. - The successful completion of the Nuclear Technical Support Provider Framework procurement has been achieved, leading to greater access to a wider pool of nuclear qualified supply chain resource to support the large number of concurrent projects across the programme. Since the Q2 1920 (30th September 2019) Amber IPA DCA, the following primary project actions have impacted the original Q2 IPA DCA; - The introduction of Joint Project teams which include representatives from all key stakeholder groups associated with complex project delivery is leading to a more inclusive culture, better communication and transparency resulting in greater efficiency and more effective ways of working. - The introduction of a Steering board for Coulport Projects with broad representation has led to more effective prioritisation and planning of work in key operational areas to address capability risks within the operational delivery programme.","startDate":"2015-09-07","endDate":"2032-03-30","scheduleNarrative":"The scheduled project end date at Q2 1920 (30th September 2019) is 30/03/32, due primarily to the following factors; - 2032 is the end date agreed when the programme was rebalanced during 2017, based on the forecast completion date of all projects within the programme. This date remains extant at this time. - The primary drivers for the completion date of the projects include the DREADNOUGHT Class in service date and achieving the endorsed ambition of a Single Integrated Operating Base. The volume of concurrent activity that can be commissioned simultaneously across the site is limited by the need to maintain operations and deconflict activity in a geographically constrained highly secure environment. Since the Q2 1920 (30th September 2019) baseline project end date of 30/03/32, the following primary project actions have impacted the original Q2 baseline project end date; - The long term impact of COVID19 on specific projects and the available industrial base is being assessed to understand the impact on the programme completion date. - Analysis of the volume of work required to remediate key facilities across the Programme, may require some re-prioritisation of the work against the original 2017 baseline. A Capability Audit has been commissioned to review the Portfolio Definition which could impact on the programme completion date.","fyBaseline":112.7,"fyForecast":117.7,"fyVariance":4.0,"varianceNarrative":"Budget variance less than 5%","wholeLifeCost":1774.57,"costNarrative":"The baseline Whole Life Cost at Q2 1920 (30th September 2019) is �1,774.57 m, has increased by �2.95 m since last year's Q2 1819 (�m) baseline Whole Life Cost of �1,771.62 m, due primarily to the following factors; - Maturing information across the programme in relation to asset condition. - Maturing information across the programme in development of estimated costs. Since the Q2 1920 (30th September 2019) �1,774.57 m baseline Whole Life Cost, the following non-project operating environment activities have impacted the original baseline Q2 Whole Life Cost; - Working restrictions due to COVID19, impact under assessment. Since the Q2 1920 (30th September 2019) �1,774.57 m baseline Whole Life Cost, the following primary project actions have impacted the original Q2 baseline Whole Life Cost; - Although the baseline costs have not moved materially, the forward profile for the programme will need to be adjusted to reflect the pace at which work can be delivered across the site given the operational exigencies that limit / constrain interventions to time bound windows of opportunity. - A Capability Audit is underway and will likely see some changes to project prioritisation which could have some impact on the long term financial profile.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Workforce & capability","Technical & integration"],"evidenceExcerpt":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber, which has declined since last year�s Q2 1819 Amber/Green, due primarily to the following factors; - The phased transition from predominantly new build scope to a greater focus on refurbishment work of existing facilities within the operational areas of the base…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2020","sourceLabel":"IPA Annual Report 2019-20","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The scheduled project end date at Q2 1920 (30th September 2019) is 30/03/32, due primarily to the following factors; - 2032 is the end date agreed when the programme was rebalanced during 2017, based on the forecast completion date of all projects within the programme. This date remains extant at this time. - The primary drivers for the completion date of the projects include the DREADNOUGHT Class in service date and achieving the endorsed ambition of a Single Integrated Operating Base. The volume of concurrent activity that can be commissioned simultaneously across the site is limited by the need to maintain operations and deconflict activity in a geographically constrained highly secure environment. Since the Q2 1920 (30th September 2019) baseline project end date of 30/03/32, the following primary project actions have impacted the original Q2 baseline project end date; - The long term impact of COVID19 on specific projects and the available industrial base is being assessed to understand the impact on the programme completion date. - Analysis of the volume of work required to remediate key facilities across the Programme, may require some re-prioritisation of the work against the original 2017 baseline. A Capability Audit has been commissioned to review the Portfolio Definition which could impact on the programme completion date.","narrativeClaimKind":null},{"id":"MOD_0118_1718-Q3","year":2021,"name":"Clyde Infrastructure","department":"MOD","category":"Military Capability","description":"The Clyde Infrstructure Programme is managing the design, delivery and transition into operational use of new build and updated infrastructure facilities in Her Majesty's Naval Base Clyde (Faslane and Coulport).","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber. This is primarily due to the following factors: Following overspend in some early projects, the programme was re-baselined to remain affordable. All changes were endorsed by the Clyde Infrastructure Programme Sponsor Board and briefed to the Ministry of Defence�Major Programmes Portfolio Sponsor Group. The programme is pivoting its delivery model and approach from 'new build' to 're-capitalisation' while minimising site operating risk. This requires�all aspects of the programme to integrate with the wider site operations. A new operating model was adopted to support this. Good progress was made in period against the challenges identified in internal reports and the November 2019 Infrastructure and Projects Authority Gateway Assurance Review. A further Gateway Assurance Review will be carried out in September 2021. Overall the Delivery Confidence Assessment remains Amber and will remain so until the revised operating model and associated behaviours are embedded within both the Programme delivery and Site operating teams.","startDate":"2015-09-07","endDate":"2032-03-30","scheduleNarrative":"Compared to financial year 19/20-Q2, the project's end-date decreased from 01 April 2032 to 30 March 2032 . This is primarily due to the following factors: - 2032 is the end date agreed when the programme was rebalanced during 2017, based on the forecast completion date of all projects. This date remains extant. - The primary drivers for the completion date include the DREADNOUGHT Class in service date and achieving the endorsed ambition of a Single Integrated Operating Base. The volume of concurrent activity that can be commissioned is limited by the need to maintain operations and deconflict activity in a geographically constrained highly secure environment. Since 30 September 2020 baseline project end date of 30 March 2032, the programme completed Capability Audit to review the Portfolio Definition, which had no immediate impact on the programme completion date, although additional items of scope are under consideration by the respective Sponsor areas, which, if subsequently endorsed for Clyde Infrastructure Programme delivery, may change this.","fyBaseline":91.17,"fyForecast":93.36,"fyVariance":2.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":1586.9,"costNarrative":"Compared to financial year 19/20-Q2, the projects Baseline Whole Life Cost decreased from 1774.57m to �1586.90m. This is primarily due to the following factors: The whole life cost of the programme reflects the budget set following rebalance of the programme and formal agreement of the budget during 2017. This also reflects the budget for the 15 year life of the programme from Financial Year 17/18 to Financial Year 31/32","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber. This is primarily due to the following factors: Following overspend in some early projects, the programme was re-baselined to remain affordable. All changes were endorsed by the Clyde Infrastructure Programme Sponsor Board and…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 19/20-Q2, the project's end-date decreased from 01 April 2032 to 30 March 2032 . This is primarily due to the following factors: - 2032 is the end date agreed when the programme was rebalanced during 2017, based on the forecast completion date of all projects. This date remains extant. - The primary drivers for the completion date include the DREADNOUGHT Class in service date and achieving the endorsed ambition of a Single Integrated Operating Base. The volume of concurrent activity that can be commissioned is limited by the need to maintain operations and deconflict activity in a geographically constrained highly secure environment. Since 30 September 2020 baseline project end date of 30 March 2032, the programme completed Capability Audit to review the Portfolio Definition, which had no immediate impact on the programme completion date, although additional items of scope are under consideration by the respective Sponsor areas, which, if subsequently endorsed for Clyde Infrastructure Programme delivery, may change this.","narrativeClaimKind":null},{"id":"MOD_0118_1718-Q3","year":2022,"name":"Clyde Infrastructure","department":"MOD","category":"Military Capability","description":"The Clyde Infrastructure Programme is managing the design, delivery and transition into operational use of new build and updated infrastructure facilities in Her Majesty's Naval Base Clyde (Faslane and Coulport).","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating decreased from Amber to Red. This is primarily due to the following factors: Although the programme is acknowledged to be well led and managed locally, the nature of the Programme means there are significant external factors which challenge its delivery including wider programme dependencies, market shortage of suitably experienced personnel and supply chain issues. Notwithstanding these challenges the Programme continues to deliver to plan.","startDate":"2015-09-07","endDate":"2032-04-01","scheduleNarrative":"Compared to 2021-Q4 the project end-date increased from 30 March 2032 to 01 April 2032. This is primarily due to the following factors: The programme end date remains within tolerable limits","fyBaseline":130.28,"fyForecast":119.81,"fyVariance":-9.0,"varianceNarrative":"The budget variance exceeds 5%. The main reasons for the variance are: 1) changes in the key supplier contract; 2) restricted site access due to ongoing COVID measures leading to delay, and 3) global supply chain issues. Although these factors, and that the site is heavily regulated with restricted access common place make it very challenging to deliver this complex Programme, this financial year has been positive with significant progress made and milestones achieved.","wholeLifeCost":1585.0,"costNarrative":"Compared to 2021-Q4, the projects Baseline Whole Life Cost decreased from 1586.90 (£m) to 1585.19 (£m). This is due to the following factors: This forecast underspend remains within tolerable limits.","benefits":null,"benefitsNarrative":"","themes":["Commercial & supply chain","Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating decreased from Amber to Red. This is primarily due to the following factors: Although the programme is acknowledged to be well led and managed locally, the nature of the Programme means there are significant external factors which challenge its…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to 2021-Q4 the project end-date increased from 30 March 2032 to 01 April 2032. This is primarily due to the following factors: The programme end date remains within tolerable limits","narrativeClaimKind":null},{"id":"MOD_0118_1718-Q3","year":2023,"name":"Clyde Infrastructure","department":"MOD","category":"Military Capability","description":"The Clyde Infrastructure Programme has been established to manage the design, delivery and transition into operational use of new build and updated infrastructure facilities at HMNB Clyde in order to enable the continued safe and secure operation of submarines, support the arrival of the next generation 'Successor' Ballistic Missile Submarines, and create a single submarine centre of specialisation.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 26 of Freedom of Information Act 2000 (Defence).","startDate":"2015-09-07","endDate":"2032-04-01","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2032-04-01. This is primarily due to the following factors. NA","fyBaseline":113.48,"fyForecast":111.2,"fyVariance":-2.0,"varianceNarrative":"The budget variance is less than or equal to 5%","wholeLifeCost":1869.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 increased from 1585m. to 1869m. This is primarily due to the following factors. The Clyde Infrastructure Programme has been subject to Reference Class Forecasting analysis focused on Faslane and Coulport Portfolios and challenges in delivering in a Nuclear and operational environment. The increased Whole Life Cost considers the impacts of operational constraints, resource availability, extraordinary inflation and material availability.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This programme does not report cashable benefits. Its aim is to provision the armed forces with the equipment and / or infrastructure required.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Workforce & capability"],"evidenceExcerpt":"Exempt under Section 26 of Freedom of Information Act 2000 (Defence). Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2032-04-01. This is primarily due to the following factors. NA","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2032-04-01. This is primarily due to the following factors. NA","narrativeClaimKind":null},{"id":"MOD_0118_1718-Q3","year":2024,"name":"Clyde Infrastructure","department":"MOD","category":"Military Capability","description":"The HMNB Clyde Infrastructure Programme has been established to manage the design, delivery and transition into operational use of new build and updated infrastructure facilities at HMNB Clyde in order to enable the continued safe and secure operation of submarines, support the arrival of the next generation Dreadnought SSBNs, and create a single submarine centre of specialisation. With an estimated budget of £1.8Bn, it is a programme of strategic national importance that is critical to sustaining Continuous At Sea Deterrence (CASD), and the safe, sustainable and cost effective operation of the Submarine Force. The end state of the programme will be “An integrated submarine operating base at Clyde, supporting a Submarine Force that is safe, secure, sustainable, resilient and ready to excel in operations out to 2067.”","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. Sustaining delivery to plan will take significant effort (people and funds) over the next 4 years as CIP delivers the most complex phase of the programme in close proximity to submarine operations. The two main issues affecting delivery confidence are, delivery planning for recapitalisation of existing facilities while they continue to be used for submarine operations, and attracting and retaining skilled staff, particularly with nuclear skills but also with programme/project skills, to a remote site in a very tight labour market in western Scotland.","startDate":"2015-09-07","endDate":"2032-04-01","scheduleNarrative":"Compared to financial year 22/23-Q4, the programme's end-date at 23/24-Q4 remained scheduled to finish on 2032-04-01","fyBaseline":109.45,"fyForecast":97.61,"fyVariance":-10.818,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. Rebaseline exercises across the Coulport Portfolio and Northern Engineering Building Value Engineering exercise, resulting in delay in placing contract and slippage into next FY.","wholeLifeCost":1870.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 increased from 1869m. to 1870m. This is primarily due to the following factors. The programme has been subject to Reference Class Forecasting (RCF) analysis, focused on the Faslane and Coulport portfolios and the challenges in delivering in a nuclear and operational environment. From this RCF analysis a revised forecast has been introduced which has increased the WLC of the programme. This considers the impacts of operational constraints, resource availability, extraordinary inflation and material availability.","benefits":0.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 0m.","themes":["Delivery & schedule","Cost & funding","Workforce & capability","Commercial & supply chain"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. Sustaining delivery to plan will take significant effort (people and funds) over the next 4 years as CIP delivers the most complex phase of the programme in close proximity to submarine operations. The two main…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 22/23-Q4, the programme's end-date at 23/24-Q4 remained scheduled to finish on 2032-04-01","narrativeClaimKind":null},{"id":"MOD_0118_1718-Q3","year":2025,"name":"CLYDE INFRASTRUCTURE","department":"MoD","category":"Military Capability","description":"The HMNB Clyde Infrastructure Programme has been established to manage the design, delivery and transition into operational use of new build and updated infrastructure facilities at HMNB Clyde in order to: enable the continued safe and secure operation of submarines, support the arrival of the next generation Dreadnought Ship Submersible Ballistic Nuclear(SSBN) Submarines, and create a single submarine centre of specialisation. With an estimated budget of £1.8Bn, it is a programme of strategic national importance that is critical to sustaining Continuous At Sea Deterrence (CASD), and the safe, sustainable and cost effective operation of the Submarine Force. The end state of the programme will be “An integrated submarine operating base at Clyde, supporting a Submarine Force that is safe, secure, sustainable and resilient, and ready to excel in operations out to 2067”.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Project's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER, compared with the Infrastructure and Projects Authority's assessment last year of AMBER. This is due to the following factors. The DCA reflects ongoing work by the programme team to deliver a number of key projects during 2024/25.","startDate":"2015-09-07","endDate":null,"scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 01/04/2032.","fyBaseline":140.06,"fyForecast":148.03,"fyVariance":5.69,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The main driver for the in-year variance of 6% is that the programme builds in prudent risk contingency to accommodate delivery in an operational naval base.","wholeLifeCost":null,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 1870 to 1876. This is primarily due to the following factors. The programme remains within approval tolerances.","benefits":null,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits","themes":["Cost & funding","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"The Project's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER, compared with the Infrastructure and Projects Authority's assessment last year of AMBER. This is due to the following factors. The DCA reflects ongoing work by the programme team to deliver a number of key projects during 2024/25. Compared to financial year 23/24-Q4, the project's…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 01/04/2032.","narrativeClaimKind":null},{"id":"MOD_0118_1718-Q3","year":2026,"name":"CLYDE INFRASTRUCTURE","department":"MOD","category":"Military Capability","description":"The HMNB Clyde Infrastructure Programme (CIP) has been established to manage the design, delivery and transition into operational use, new build and updated infrastructure facilities at HMNB Clyde. In order to: enable the continued safe and secure operation of submarines; support the arrival of the next generation Dreadnought SSBNs; and create a single submarine centre of specialisation. With an estimated budget of £3.3Bn, it is a programme of strategic national importance that is critical to sustaining Continuous At Sea Deterrence, and the safe, sustainable and cost effective operation of the Submarine Force. The end state of the programme will be “An integrated submarine operating base at Clyde, supporting a Submarine Force that is safe, secure, sustainable and resilient, and ready to excel in operations out to 2067.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors. 1. The Delivery Confidence Assessment reflects successful completion of nine projects by the programme team up to 2025/26. 2. Despite recent successes, our resource position remains a risk. We continue to face challenges in recruiting sufficient staff and securing the level of industry support required to sustain delivery. Resourcing needs will have to be proactively managed to ensure we can maintain momentum and meet our commitments.","startDate":"2015-09-07","endDate":"2032-04-01","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme end-date at 25/26-Q4 remained the same at 01/04/2032.","fyBaseline":255.06,"fyForecast":236.11,"fyVariance":7.43,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. 1. The main driver for the 7% in-year variance is the need for the programme to work within the operational areas of HMNB Clyde and forecast sufficient flexibility to maintain capital works around operational priorities. 2. During 25/26 operational plans have affected the ability to deliver the original planned spend.","wholeLifeCost":3324.98,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally-agreed Whole Life Cost at 25/26-Q4 (measured in £m) increased from £1876.3M to £3287.2M. This is primarily due to the following factors. 1. The forecast Whole Life Costs has increased to reflect new requirements and improved understanding of the conditions of the existing infrastructures and the levels of intervention required to achieve the required programme outcomes.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Delivery & schedule","Workforce & capability","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors. 1. The Delivery Confidence Assessment reflects successful completion of nine projects by the programme team up to 2025/26. 2. Despite recent successes, our resource position remains a…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the programme end-date at 25/26-Q4 remained the same at 01/04/2032.","narrativeClaimKind":null}],"previous":{"id":"MOD_0118_1718-Q3","year":2025,"name":"CLYDE INFRASTRUCTURE","department":"MoD","category":"Military Capability","description":"The HMNB Clyde Infrastructure Programme has been established to manage the design, delivery and transition into operational use of new build and updated infrastructure facilities at HMNB Clyde in order to: enable the continued safe and secure operation of submarines, support the arrival of the next generation Dreadnought Ship Submersible Ballistic Nuclear(SSBN) Submarines, and create a single submarine centre of specialisation. With an estimated budget of £1.8Bn, it is a programme of strategic national importance that is critical to sustaining Continuous At Sea Deterrence (CASD), and the safe, sustainable and cost effective operation of the Submarine Force. The end state of the programme will be “An integrated submarine operating base at Clyde, supporting a Submarine Force that is safe, secure, sustainable and resilient, and ready to excel in operations out to 2067”.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Project's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER, compared with the Infrastructure and Projects Authority's assessment last year of AMBER. This is due to the following factors. The DCA reflects ongoing work by the programme team to deliver a number of key projects during 2024/25.","startDate":"2015-09-07","endDate":null,"scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 01/04/2032.","fyBaseline":140.06,"fyForecast":148.03,"fyVariance":5.69,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The main driver for the in-year variance of 6% is that the programme builds in prudent risk contingency to accommodate delivery in an operational naval base.","wholeLifeCost":null,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 1870 to 1876. This is primarily due to the following factors. The programme remains within approval tolerances.","benefits":null,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits","themes":["Cost & funding","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"The Project's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER, compared with the Infrastructure and Projects Authority's assessment last year of AMBER. This is due to the following factors. The DCA reflects ongoing work by the programme team to deliver a number of key projects during 2024/25. Compared to financial year 23/24-Q4, the project's…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 01/04/2032.","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":null,"attentionScore":20,"attentionReasons":["Current published delivery confidence is Amber","In-year forecast variance is +7.4%"]},{"id":"DEFRA_0040_2122-Q3","year":2026,"name":"COLLECTIONS, PACKAGING AND REFORMS PROGRAMME","department":"DEFRA","category":"Government Transformation and Service Delivery","description":"The CPR Programme, part of the Circular Economy Portfolio, aims to develop a world-class system for collection and disposal of packaging materials that emphasises reduction, reuse, and recycling. This initiative represents a significant shift in packaging management to support a responsible and resource-efficient economy while minimising the environmental impact of packaging and contributing to Net Zero goals across the four nations. The Programme is being delivered through four interlinking projects: Packaging Extended Producer Responsibility (pEPR), Simpler Recycling Collections (SRC), Deposit Return Scheme for Drinks Containers (DRS) and Digital Waste Tracking (DWT).","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. The programme was also rated Amber in the annual NISTA Review in May 2025. The report concluded that while the CPR programme improved and is broadly feasible (Amber), delivery remained highly complex and time-critical, requiring urgent action on commercial capability, contingency planning, stakeholder engagement, and benefits realisation to mitigate risks and ensure intended outcomes are achieved. All recommendations were actioned withing the given timescale. This rating is primarily due to the following factors: progress continued across legislation, funding and business readiness, with delivery increasingly focused on mobilisation and transition to live operations; however, outcomes remained sensitive to partner readiness, capacity constraints and reliance on digital delivery. For Extended Producer Responsibility for packaging (pEPR), the Amending SI was laid on 3 November and tracked to come into force on 1 January 2026, with Notices of Liabilities issued to producers on 14 October (4,305 invoices totalling £1.465bn) and delivery of some digital functionality pivoted to alternative plans to protect critical delivery. For Deposit Return Scheme (DRS), a Deposit Management Organisation (DMO) candidate for England and Northern Ireland was appointed on 2 May, progressed recruitment and financial modelling, split the IT programme into five phases (phase 1 analysis/design) and launched scheme branding (“Exchange for Change”), while highlighting the need for greater certainty before entering key contractual commitments. For Simpler Recycling Collections (SRC), delivery remained challenged by Local Authority funding and readiness risks (including Spending Review 25 Phase 1 decisions), mitigated through enhanced engagement (including a ‘Change Network’) and infrastructure planning; by Q3 over £258.3m had been paid to LAs for upfront costs and mobilisation continued toward household go live on 31 March 2026. For Digital Waste Tracking (DWT), Alpha was passed on 25 June 2025 (rated Amber), Private Beta commenced (from 16 July subject to approvals) and began testing on 7 November 2025, with Phase 1 legislation and the Impact Assessment progressing and public beta planned for April 2026. Delivery remains dependent on external partners (including Local Authorities, producers and waste management companies) being ready and able to adopt reforms, and continues to be constrained by infrastructure and processing capacity (notably for flexible plastics), supply chain constraints for physical assets (bins/vehicles), variability in local resourcing, and ongoing reliance on digital systems and data outputs across projects. The focus moving into the next quarter is on stabilising live delivery, intensifying readiness and engagement activity, and protecting delivery-critical milestones to prevent slippage and avoid risk escalation.","startDate":"2018-04-02","endDate":"2028-06-01","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 increased from 1 May 2028 to 1 June 2028. This is due to aligning with the DRS closure date captured within the milestones.","fyBaseline":2372.51,"fyForecast":2449.38,"fyVariance":3.24,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to a reduction in RDEL following Digital Waste Tracking updated delivery plans. In addition, there were reductions in both RDEL & CDEL in Simpler Recycling transitional costs to Local Authorities following detailed modelling and allowing for an appeals process. Further underspend arose from Depot Appeals costs being lower than originally forecast. As a result, the final outturn of circa £48.36m (TDEL) is below the agreed in-year budget of £70.4m (TDEL).","wholeLifeCost":5204.73,"costNarrative":"The figure differs from the previous year’s annual report as the GRIP was completed using a different methodology. When compared to the previous version of the PBC in December 2024, the project's Whole Life Cost decreased from £19,792m to £13,643m. The reductions are in part due to changes in assumptions for funding allocation for Simpler Recycling since previous projections.","benefits":13364.9,"benefitsNarrative":"Compared to financial year 24/25-Q4, the programme’s benefits at 25/26-Q4 increased from £11,611m to £15,971m. This is primarily due to an update to bring the assessment in line with updated analysis used in the programme business case. The updated estimate uses yearly net economic benefit figures (total benefits minus total costs). All figures are undiscounted, and in 2024 price base year. These figures have been quality assured and project level analysis has passed clearance processes.","themes":["Delivery & schedule","Cost & funding","Technical & integration","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. The programme was also rated Amber in the annual NISTA Review in May 2025. The report concluded that while the CPR programme improved and is broadly feasible (Amber), delivery remained highly complex and time-critical, requiring…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 increased from 1 May 2028 to 1 June 2028. This is due to aligning with the DRS closure date captured within the milestones.","narrativeClaimKind":null,"history":[{"id":"DEFRA_0040_2122-Q3","year":2022,"name":"Collection and Packaging Reforms","department":"DEFRA","category":"Government Transformation and Service Delivery","description":"The three projects included within the Collection and Packaging reforms programme - Extended Producer Responsibility for packaging (pEPR), Deposit Return Scheme for drinks containers (DRS) and Consistency in Recycling Collections (Consistency) - will deliver significant changes to the waste collection and recycling sector including bringing benefits such as the creation of green jobs and significant carbon savings, contributing to Net Zero and outcomes in Defra's 25 Year Environment Plan.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 is Red Expected rating - RED. CPR agrees with the IPA RAG Rating and it matches our own Delivery Confidence Assessment at this time. We will continue on our path to green, as we work to identify and overcome our key delivery challenges and mitigate against our programme and project level risks. We are confident that our recently strengthened governance arrangements and our increased assurance forums will also support this. This will be complimented by our first IPA Gate 0 Review, to be held in June 2022, which will act as a further deep dive and we will incorporate further recommendations from this.","startDate":"2018-04-02","endDate":"2027-03-31","scheduleNarrative":"Your project end-date is 31 MAR 2027. This is primarily due to the following factors: CPR's does not have detailed plans at this point because some key policy questions and delivery approaches have not been finalised. Following publication of the EPR government response in March, market and stakeholder engagement has commenced. This will clarify headline options and timelines. Similar exercises are planned for DRS and Consistency. There is limited contingency in CPR plans and significant uncertainty. In response the team are identifying and escalating priority decisions to safeguard key milestones. The programme will continue to review the planned schedule and escalate any decisions required around meeting or changing key milestones via the appropriate escalation routes.","fyBaseline":12.92,"fyForecast":8.06,"fyVariance":-38.0,"varianceNarrative":"The baseline that was approved by Investment Committee in the SOBC was prior to business planning for 2021/22 and so was subject to change. The forecasted costs for 2021/22 ended up being lower than anticipated in the SOBC due to a number of uncertainties and delays to policy development, meaning work could not be progressed and therefore the money was not spent.","wholeLifeCost":null,"costNarrative":"Exempt under Section 35 of the Freedom of Information Act 2000 (Formulation of governmnet policy).","benefits":null,"benefitsNarrative":"","themes":["Delivery & schedule","Governance & assurance","Commercial & supply chain"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 is Red Expected rating - RED. CPR agrees with the IPA RAG Rating and it matches our own Delivery Confidence Assessment at this time. We will continue on our path to green, as we work to identify and overcome our key delivery challenges and mitigate against our programme…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Your project end-date is 31 MAR 2027. This is primarily due to the following factors: CPR's does not have detailed plans at this point because some key policy questions and delivery approaches have not been finalised. Following publication of the EPR government response in March, market and stakeholder engagement has commenced. This will clarify headline options and timelines. Similar exercises are planned for DRS and Consistency. There is limited contingency in CPR plans and significant uncertainty. In response the team are identifying and escalating priority decisions to safeguard key milestones. The programme will continue to review the planned schedule and escalate any decisions required around meeting or changing key milestones via the appropriate escalation routes.","narrativeClaimKind":null},{"id":"DEFRA_0040_2122-Q3","year":2023,"name":"Collection and Packaging Reforms","department":"DEFRA","category":"Government Transformation and Service Delivery","description":"The three projects included within the Collection and Packaging reforms programme Extended Producer Responsibility for packaging (pEPR), Deposit Return Scheme for drinks containers (DRS) and Consistency in Recycling Collections (Consistency) - will deliver significant changes to the waste collection and recycling sector including bringing benefits such as the creation of green jobs and significant carbon savings, contributing to Net Zero and outcomes in Defra's 25 Year Environment Plan","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Red. This is primarily due to the following factors. The Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q3 is RED. DEFRA agrees with this rating. Delivery confidence is low due to the challenging timescales in which DEFRA needs to implement the reforms. Work to support this implementation is ongoing with a particular focus on strengthening our plans, programme control and benefits management.","startDate":"2018-04-02","endDate":"2027-03-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2027-03-31. This is primarily due to the following factors. Collection & Packaging Reforms Programme has been delayed repeatedly. Two of three key Government responses to consultation now published: Extended Producer Responsibility - March 22; Deposit Return Scheme - January 23; Consistency - outstanding. Detailed delivery has been reprogrammed such that target end date is still feasible, but there is limited contingency available.","fyBaseline":29.16,"fyForecast":30.77,"fyVariance":6.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors: 1) The baseline that was approved by Investment Committee in the SOBC was prior to business planning for 2022/23 and was subject to change. 2) Delay in progressing work during 2021/22.","wholeLifeCost":null,"costNarrative":"Early planning GMPP project (The project has not yet passed SOC, or its programme equivalent)","benefits":11611.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 11611m. The project's departmental-agree monetised benefits at 22/23-Q4 is 11611m.The project's departmental-agree monetised benefits at 22/23-Q4 is 11611m.The project's departmental-agree monetised benefits at 22/23-Q4 is 11611m. 1) this estimate is based only on the economic transfer of packaging recycling and waste management costs from Local Authorities to producers - making obligated producers responsible for the disposal cost of their packaging is a key outcome of the programme 2) qualitatively, we understand there are significant additional benefits and the modelled values of these are currently undergoing review; we will be in a position to update on these by 31/12/2023.","themes":["Delivery & schedule","Cost & funding"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Red. This is primarily due to the following factors. The Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q3 is RED. DEFRA agrees with this rating. Delivery confidence is low due to the…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2027-03-31. This is primarily due to the following factors. Collection & Packaging Reforms Programme has been delayed repeatedly. Two of three key Government responses to consultation now published: Extended Producer Responsibility - March 22; Deposit Return Scheme - January 23; Consistency - outstanding. Detailed delivery has been reprogrammed such that target end date is still feasible, but there is limited contingency available.","narrativeClaimKind":null},{"id":"DEFRA_0040_2122-Q3","year":2024,"name":"Collection and Packaging Reforms","department":"DEFRA","category":"Government Transformation and Service Delivery","description":"CPR is a programme of five projects included within the Collection and Packaging reforms programme - Extended Producer Responsibility for packaging (EPR), Deposit Return Scheme for Drinks Containers (DRS), Simpler Recycling, Waste Tracking, and Disposable Cups that will deliver significant changes to the waste collection and recycling sector including bringing benefits such as the creation of green jobs and significant carbon savings, contributing to Net Zero.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 decreased from Red to Amber. This is primarily due to the following factors. The Infrastructure Project Authority's Delivery Confidence Assessment rating at 2324 Q4 has improved to Amber. DEFRA agrees with this rating. Detailed plans are in place to address all of the IPA recommendations within the agreed timeline.","startDate":"2018-04-02","endDate":"2027-03-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2027-03-31. This is primarily due to the following factors. The programme was successfully reset in 2023. With meticulous management of our legislation and delivery, delivery is feasible, though highly challenging. There is limited contingency in CPR plans and key ministerial decisions remain outstanding; a late autumn general election could further impact. In response the team have identified and escalated priority decisions to safeguard key milestones. The programme will continue to review the planned schedule and escalate any decisions required around meeting or changing key milestones via the appropriate escalation routes.","fyBaseline":338.8,"fyForecast":341.71,"fyVariance":1.0,"varianceNarrative":"The budget variance is inferior or equal to 5%.","wholeLifeCost":null,"costNarrative":"Exempt under Section 35 of the Freedom of Information Act 2000 (Exempt under Section 35 of the Freedom of Information Act 2000 (Formulation of government policy,etc.))","benefits":11611.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 11611m. 1) this estimate is based only on the economic transfer of packaging recycling and waste management costs from Local Authorities to producers over the 10 year appraisal period - making obligated producers responsible for the disposal cost of their packaging is a key outcome of the programme 2) qualitatively, we understand there are significant additional benefits and the modelled values of these are currently undergoing review; we will be in a position to update on these by 30/04/2025.","themes":["Delivery & schedule","Cost & funding","Governance & assurance","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 decreased from Red to Amber. This is primarily due to the following factors. The Infrastructure Project Authority's Delivery Confidence Assessment rating at 2324 Q4 has improved to Amber. DEFRA agrees with this rating. Detailed plans…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2027-03-31. This is primarily due to the following factors. The programme was successfully reset in 2023. With meticulous management of our legislation and delivery, delivery is feasible, though highly challenging. There is limited contingency in CPR plans and key ministerial decisions remain outstanding; a late autumn general election could further impact. In response the team have identified and escalated priority decisions to safeguard key milestones. The programme will continue to review the planned schedule and escalate any decisions required around meeting or changing key milestones via the appropriate escalation routes.","narrativeClaimKind":null},{"id":"DEFRA_0040_2122-Q3","year":2025,"name":"COLLECTIONS, PACKAGING AND REFORMS PROGRAMME","department":"DEFRA","category":"Government Transformation and Service Delivery","description":"The CPR Programme, part of the forming Circular Economy Sub Portfolio, aims to develop a world-class system for collecting and packaging materials that emphasise reduction, reuse, and recycling. This initiative represents a significant shift in packaging management to support a responsible and resource-efficient economy while minimising the environmental impact of packaging and contributing to Net Zero goals across the four nations. The Programme will be delivered through four interlinking projects: Packaging Extended Producer Responsibility (pEPR), Simpler Recycling (SR), Deposit Return Scheme for Drinks Containers (DRS) and Digital Waste Tracking (DWT).","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at Amber. This is primarily due to the following factors‚ The previous assurance review of the CPR programme (Nov 23) highlighted critical concerns around the timelines for the Packaging Extended Producer Responsibility (pEPR) and Deposit Return Scheme (DRS) projects, particularly due to dependencies on secondary legislation, limited influence over local authorities, gaps in the pEPR commercial strategy, and resourcing challenges. Since then, a strong Programme team has been established, and progress has been made both technically and with stakeholders. However, several key risks remain and require continued focus: underperformance in IT system delivery for pEPR (though not currently affecting immediate milestones), a tight schedule for implementing the second phase of pEPR charging, unresolved issues around a pan-UK DRS agreement, local authority funding and delivery challenges, the need for sustained behaviour change across citizens and industry, and enforcement risks. The current performance of the programme team suggests that these should be capable of resolution, but success will depend on the capability and effectiveness of key private sector partners, particularly scheme management organisations.","startDate":"2018-04-02","endDate":"2028-05-01","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2027 to 01/05/2028. This is primarily due to the following factors‚ The Collection & Packaging Reforms Programme continues to make progress towards deliverables with multiple Statutory Instruments laid in Parliament; Digital Waste Tracking are scheduled to lay Phase 1 Statutory Instrument in spring 2026. As a result of the delays in the delivery of Digital Waste Tracking to April 2026, and the Deposit Return Scheme to October 2027, the programme's end date has been increased to 01/05/2028 to accommodate programme closure activities post-delivery of key projects. The programme will continue to review the planned schedule and escalate any decisions required around meeting or changing key milestones via the appropriate escalation routes.","fyBaseline":132.0,"fyForecast":132.0,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%. Within 5% tolerance","wholeLifeCost":1192.18,"costNarrative":"The project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) is 1192. This is primarily due to the following factors‚ Whole life cost (WLC) of the Collection & Packaging Reforms Programme aligns to HM Treasury's Green Book governance, and encompasses the total financial commitment required over the entire lifespan of a project. This includes all costs associated with its development, implementation, operation, maintenance, and decommissioning of assets that the project owns e.g. IT. The key components of the Collection & Packaging Reforms Programme WLC include: – Initial Capital Costs. – Expenses related to design, development and procurement. – Operational Costs. – Ongoing expenses such as staffing, utilities, and administration. – Maintenance & Repair Costs. – Costs for upkeep, servicing, and unexpected repairs. – Replacement Costs. – Expenses for renewing or upgrading assets over time. – End-of-Life Costs. – Decommissioning, disposal, or repurposing costs.","benefits":4100.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 11611 to 41000000000. This is primarily due to the following factors‚ The £11.6bn figure (£12bn adjusted for 2024) is the result of the £41bn benefits net of £29bn of costs across the appraisal period. The programme has operated on the assumption that the monetised benefits for the Collection & Packaging Reforms Programme equate to £11.6bn, this takes into account the existing benefits profile the programme is looking to deliver, but also the economic benefits. The figure of £11.6bn is the consistent messaging that has been provided in the programme business case to date.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at Amber. This is primarily due to the following factors‚ The previous assurance review of the CPR programme (Nov 23) highlighted critical concerns around the timelines for the Packaging Extended Producer Responsibility…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2027 to 01/05/2028. This is primarily due to the following factors‚ The Collection & Packaging Reforms Programme continues to make progress towards deliverables with multiple Statutory Instruments laid in Parliament; Digital Waste Tracking are scheduled to lay Phase 1 Statutory Instrument in spring 2026. As a result of the delays in the delivery of Digital Waste Tracking to April 2026, and the Deposit Return Scheme to October 2027, the programme's end date has been increased to 01/05/2028 to accommodate programme closure activities post-delivery of key projects. The programme will continue to review the planned schedule and escalate any decisions required around meeting or changing key milestones via the appropriate escalation routes.","narrativeClaimKind":null},{"id":"DEFRA_0040_2122-Q3","year":2026,"name":"COLLECTIONS, PACKAGING AND REFORMS PROGRAMME","department":"DEFRA","category":"Government Transformation and Service Delivery","description":"The CPR Programme, part of the Circular Economy Portfolio, aims to develop a world-class system for collection and disposal of packaging materials that emphasises reduction, reuse, and recycling. This initiative represents a significant shift in packaging management to support a responsible and resource-efficient economy while minimising the environmental impact of packaging and contributing to Net Zero goals across the four nations. The Programme is being delivered through four interlinking projects: Packaging Extended Producer Responsibility (pEPR), Simpler Recycling Collections (SRC), Deposit Return Scheme for Drinks Containers (DRS) and Digital Waste Tracking (DWT).","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. The programme was also rated Amber in the annual NISTA Review in May 2025. The report concluded that while the CPR programme improved and is broadly feasible (Amber), delivery remained highly complex and time-critical, requiring urgent action on commercial capability, contingency planning, stakeholder engagement, and benefits realisation to mitigate risks and ensure intended outcomes are achieved. All recommendations were actioned withing the given timescale. This rating is primarily due to the following factors: progress continued across legislation, funding and business readiness, with delivery increasingly focused on mobilisation and transition to live operations; however, outcomes remained sensitive to partner readiness, capacity constraints and reliance on digital delivery. For Extended Producer Responsibility for packaging (pEPR), the Amending SI was laid on 3 November and tracked to come into force on 1 January 2026, with Notices of Liabilities issued to producers on 14 October (4,305 invoices totalling £1.465bn) and delivery of some digital functionality pivoted to alternative plans to protect critical delivery. For Deposit Return Scheme (DRS), a Deposit Management Organisation (DMO) candidate for England and Northern Ireland was appointed on 2 May, progressed recruitment and financial modelling, split the IT programme into five phases (phase 1 analysis/design) and launched scheme branding (“Exchange for Change”), while highlighting the need for greater certainty before entering key contractual commitments. For Simpler Recycling Collections (SRC), delivery remained challenged by Local Authority funding and readiness risks (including Spending Review 25 Phase 1 decisions), mitigated through enhanced engagement (including a ‘Change Network’) and infrastructure planning; by Q3 over £258.3m had been paid to LAs for upfront costs and mobilisation continued toward household go live on 31 March 2026. For Digital Waste Tracking (DWT), Alpha was passed on 25 June 2025 (rated Amber), Private Beta commenced (from 16 July subject to approvals) and began testing on 7 November 2025, with Phase 1 legislation and the Impact Assessment progressing and public beta planned for April 2026. Delivery remains dependent on external partners (including Local Authorities, producers and waste management companies) being ready and able to adopt reforms, and continues to be constrained by infrastructure and processing capacity (notably for flexible plastics), supply chain constraints for physical assets (bins/vehicles), variability in local resourcing, and ongoing reliance on digital systems and data outputs across projects. The focus moving into the next quarter is on stabilising live delivery, intensifying readiness and engagement activity, and protecting delivery-critical milestones to prevent slippage and avoid risk escalation.","startDate":"2018-04-02","endDate":"2028-06-01","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 increased from 1 May 2028 to 1 June 2028. This is due to aligning with the DRS closure date captured within the milestones.","fyBaseline":2372.51,"fyForecast":2449.38,"fyVariance":3.24,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to a reduction in RDEL following Digital Waste Tracking updated delivery plans. In addition, there were reductions in both RDEL & CDEL in Simpler Recycling transitional costs to Local Authorities following detailed modelling and allowing for an appeals process. Further underspend arose from Depot Appeals costs being lower than originally forecast. As a result, the final outturn of circa £48.36m (TDEL) is below the agreed in-year budget of £70.4m (TDEL).","wholeLifeCost":5204.73,"costNarrative":"The figure differs from the previous year’s annual report as the GRIP was completed using a different methodology. When compared to the previous version of the PBC in December 2024, the project's Whole Life Cost decreased from £19,792m to £13,643m. The reductions are in part due to changes in assumptions for funding allocation for Simpler Recycling since previous projections.","benefits":13364.9,"benefitsNarrative":"Compared to financial year 24/25-Q4, the programme’s benefits at 25/26-Q4 increased from £11,611m to £15,971m. This is primarily due to an update to bring the assessment in line with updated analysis used in the programme business case. The updated estimate uses yearly net economic benefit figures (total benefits minus total costs). All figures are undiscounted, and in 2024 price base year. These figures have been quality assured and project level analysis has passed clearance processes.","themes":["Delivery & schedule","Cost & funding","Technical & integration","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. The programme was also rated Amber in the annual NISTA Review in May 2025. The report concluded that while the CPR programme improved and is broadly feasible (Amber), delivery remained highly complex and time-critical, requiring…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 increased from 1 May 2028 to 1 June 2028. This is due to aligning with the DRS closure date captured within the milestones.","narrativeClaimKind":null}],"previous":{"id":"DEFRA_0040_2122-Q3","year":2025,"name":"COLLECTIONS, PACKAGING AND REFORMS PROGRAMME","department":"DEFRA","category":"Government Transformation and Service Delivery","description":"The CPR Programme, part of the forming Circular Economy Sub Portfolio, aims to develop a world-class system for collecting and packaging materials that emphasise reduction, reuse, and recycling. This initiative represents a significant shift in packaging management to support a responsible and resource-efficient economy while minimising the environmental impact of packaging and contributing to Net Zero goals across the four nations. The Programme will be delivered through four interlinking projects: Packaging Extended Producer Responsibility (pEPR), Simpler Recycling (SR), Deposit Return Scheme for Drinks Containers (DRS) and Digital Waste Tracking (DWT).","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at Amber. This is primarily due to the following factors‚ The previous assurance review of the CPR programme (Nov 23) highlighted critical concerns around the timelines for the Packaging Extended Producer Responsibility (pEPR) and Deposit Return Scheme (DRS) projects, particularly due to dependencies on secondary legislation, limited influence over local authorities, gaps in the pEPR commercial strategy, and resourcing challenges. Since then, a strong Programme team has been established, and progress has been made both technically and with stakeholders. However, several key risks remain and require continued focus: underperformance in IT system delivery for pEPR (though not currently affecting immediate milestones), a tight schedule for implementing the second phase of pEPR charging, unresolved issues around a pan-UK DRS agreement, local authority funding and delivery challenges, the need for sustained behaviour change across citizens and industry, and enforcement risks. The current performance of the programme team suggests that these should be capable of resolution, but success will depend on the capability and effectiveness of key private sector partners, particularly scheme management organisations.","startDate":"2018-04-02","endDate":"2028-05-01","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2027 to 01/05/2028. This is primarily due to the following factors‚ The Collection & Packaging Reforms Programme continues to make progress towards deliverables with multiple Statutory Instruments laid in Parliament; Digital Waste Tracking are scheduled to lay Phase 1 Statutory Instrument in spring 2026. As a result of the delays in the delivery of Digital Waste Tracking to April 2026, and the Deposit Return Scheme to October 2027, the programme's end date has been increased to 01/05/2028 to accommodate programme closure activities post-delivery of key projects. The programme will continue to review the planned schedule and escalate any decisions required around meeting or changing key milestones via the appropriate escalation routes.","fyBaseline":132.0,"fyForecast":132.0,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%. Within 5% tolerance","wholeLifeCost":1192.18,"costNarrative":"The project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) is 1192. This is primarily due to the following factors‚ Whole life cost (WLC) of the Collection & Packaging Reforms Programme aligns to HM Treasury's Green Book governance, and encompasses the total financial commitment required over the entire lifespan of a project. This includes all costs associated with its development, implementation, operation, maintenance, and decommissioning of assets that the project owns e.g. IT. The key components of the Collection & Packaging Reforms Programme WLC include: – Initial Capital Costs. – Expenses related to design, development and procurement. – Operational Costs. – Ongoing expenses such as staffing, utilities, and administration. – Maintenance & Repair Costs. – Costs for upkeep, servicing, and unexpected repairs. – Replacement Costs. – Expenses for renewing or upgrading assets over time. – End-of-Life Costs. – Decommissioning, disposal, or repurposing costs.","benefits":4100.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 11611 to 41000000000. This is primarily due to the following factors‚ The £11.6bn figure (£12bn adjusted for 2024) is the result of the £41bn benefits net of £29bn of costs across the appraisal period. The programme has operated on the assumption that the monetised benefits for the Collection & Packaging Reforms Programme equate to £11.6bn, this takes into account the existing benefits profile the programme is looking to deliver, but also the economic benefits. The figure of £11.6bn is the consistent messaging that has been provided in the programme business case to date.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at Amber. This is primarily due to the following factors‚ The previous assurance review of the CPR programme (Nov 23) highlighted critical concerns around the timelines for the Packaging Extended Producer Responsibility…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2027 to 01/05/2028. This is primarily due to the following factors‚ The Collection & Packaging Reforms Programme continues to make progress towards deliverables with multiple Statutory Instruments laid in Parliament; Digital Waste Tracking are scheduled to lay Phase 1 Statutory Instrument in spring 2026. As a result of the delays in the delivery of Digital Waste Tracking to April 2026, and the Deposit Return Scheme to October 2027, the programme's end date has been increased to 01/05/2028 to accommodate programme closure activities post-delivery of key projects. The programme will continue to review the planned schedule and escalate any decisions required around meeting or changing key milestones via the appropriate escalation routes.","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":31,"attentionScore":20,"attentionReasons":["Current published delivery confidence is Amber","Published end date moved 31 days later"]},{"id":"CO_0033_2122-Q1","year":2026,"name":"GOV.UK One Login","department":"DSIT","category":"Government Transformation and Service Delivery","description":"GOV.UK One Login is being developed as the single sign-on and identity verification front door for accessing government services. This will replace up to 300 individual accounts, accessed via 44 different sign-in methods; and will provide a significantly improved user experience. Our aim is to make it as simple, inclusive, and secure as possible for individuals to prove their identity and access connected services, while protecting them and the government from the risks of fraud.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors that‚ GOV.UK One Login is continuing to scale, with over 200 services already onboarded, for example apply for a Disclosure and Barring Service (DBS) check, and sign a mortgage deed .Over time, all central government services will be accessible through GOV.UK One Login. Over 15 million people have proven who they are through One Login, and its identity verification app - which has a rating of 4.6* on Android and iOS stores respectively - has been downloaded more than 16 million times.","startDate":"2021-01-04","endDate":"2028-03-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same which is 31st March 28 which covers the length of the approved Full Business Case which is running from 25/26 to 27/28 and has been approved by HM Treasury.","fyBaseline":120.24,"fyForecast":127.09,"fyVariance":5.7,"varianceNarrative":"The budget variance is less than or equal to 5%","wholeLifeCost":708.86,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) increased due to a successful new Full Business Case being approved at DSIT Investment Committee and HM Treasury Approvals Panel which provided GDS with the funding to continue the programme for another 3 financial years.","benefits":4731.89,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed benefits at 25/26-Q4 (measured in £m) increased due to the continuation of One Login as a funded programme. Its projected benefits were scrutinised by HM Treasury and will far outweigh financial investment into the programme.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors that‚ GOV.UK One Login is continuing to scale, with over 200 services already onboarded, for example apply for a Disclosure and Barring Service (DBS) check, and sign a mortgage deed…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same which is 31st March 28 which covers the length of the approved Full Business Case which is running from 25/26 to 27/28 and has been approved by HM Treasury.","narrativeClaimKind":null,"history":[{"id":"CO_0033_2122-Q1","year":2022,"name":"Digital Identity","department":"CO","category":"ICT","description":"One Login will provide a single account for citizens to login, prove their identity simply and securely, and access central government online services. It will enable more people to use more HMG services, improving inclusion and decreasing reliance on slower offline routes, and will reduce duplication, costs and fraud across government.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 is Amber. The One Login programme made significant progress in 2021/22, and momentum is continuing to build. It is fully funded following the 2021 Spending Review, and has strong backing from departments and services across government. One Login's sign-on component went live in October 2021 and, as a result of extensive development and planning work in 2021/22, the programme is on track to meet its critical milestones in 2022/23; these include the initial release of One Login's identity verification solution, the subsequent launch of an identity checking App, and the onboarding of its first services and live users. The overall AMBER rating reflects the challenging pace of delivery and the complex issues around resourcing, both of which the GDS team is actively desrisking.","startDate":"2021-01-04","endDate":"2025-03-31","scheduleNarrative":"Your project end-date is 31 MAR 2025. This is primarily due to the following factors: We are Amber at the end of 2021/22 due to recruitment and procurement delays. Overall confidence is increasing following careful planning and testing which has de-risked subsequent delivery.","fyBaseline":21.68,"fyForecast":16.58,"fyVariance":-24.0,"varianceNarrative":"Fewer staff than budgetted and length of procurement process for DOS contracts has resulted in lower than budget spend.","wholeLifeCost":22.0,"costNarrative":"Your projects Baseline Whole Life Cost is 21.68 (£m). This is primarily due to the following factors: Project is below budget due to fewer staff and delays in contract procurements.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Workforce & capability"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 is Amber. The One Login programme made significant progress in 2021/22, and momentum is continuing to build. It is fully funded following the 2021 Spending Review, and has strong backing from departments and services across government. One Login's sign-on component went…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Your project end-date is 31 MAR 2025. This is primarily due to the following factors: We are Amber at the end of 2021/22 due to recruitment and procurement delays. Overall confidence is increasing following careful planning and testing which has de-risked subsequent delivery.","narrativeClaimKind":null},{"id":"CO_0033_2122-Q1","year":2023,"name":"GOV.UK One Login","department":"CO","category":"ICT","description":"GOV.UK One Login will provide a single account for people to log in, prove (and then reuse) their identity in order to access all central HMG services. The programme, delivered by GDS, will replace the current digital landscape of siloed and duplicative sign-in and identity-proofing methods, providing a front door for services that will continue to be delivered by government departments. In doing so GOV.UK One Login will provide a better user experience, more efficient use of government resources and strengthen the government's ability to counter fraud. The system has been designed with inclusion at its core, so that it will work for everyone. One Login will raise the degree of confidence of identity verifications against internationally recognised GPG 45 standards and improve our ability to spot patterns and more sophisticated types of fraud.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. The GOV.UK One Login programme continued to deliver at pace in 2022/23, successfully meeting its major planned milestones. These included the launch of One Login's web- and app-based identity checking routes, integrated with its authentication and account functionality, and the onboarding of its first [8] government services. By year-end, over 1 million users had successfully proved their identity through One Login. The programme deepened its collaboration with departments, agreeing roadmaps that will see the bulk of central government services move to One Login in the current Spending Review period, in line with the programme's business case. This progress also enabled the legacy GOV.UK Verify system to be retired, as planned. The overall AMBER rating reflects the challenging pace of delivery, especially as GOV.UK One Login scales up, and the complexity of both the technical solution and the migration of major government services, all of which the GDS team is actively de-risking.","startDate":"2021-01-04","endDate":"2025-03-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2025-03-31. This is primarily due to the following factors. We are Amber at the end of 2022/23 due to the pace and complexity of delivery, complicated technical solutions, Cyber and Information security, and stakeholder challenges. We have multiple services and accessibility issues to consider which makes this a very technical and challenging programme within the product development space. Overall confidence is increasing following the upturn in recruitment, careful planning and effective risk management. Onboarding of the first set of services has given further confidence in completion of the programme as scheduled in 2025.","fyBaseline":114.0,"fyForecast":114.0,"fyVariance":0.0,"varianceNarrative":"The programme's departmental-agree Whole Life Cost at 22/23-Q4 is 305m. One Login build and running costs have ramped up in 23/24 as the product is developed and services onboarded.","wholeLifeCost":305.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 increased from 22m. to 305m. This is primarily due to the following factors. The programme's departmental-agree Whole Life Cost at 22/23-Q4 is 305m. One Login build and running costs have ramped up in 23/24 as the product is developed and services onboarded.","benefits":1752.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 1752m. The programme's departmental-agreed monetised benefits, at 22/23-Q4, is 1751.6m for the 5 year projection. The cashable savings in the business case include reducing identity verification and authentication costs; reducing total cost of online user support whilst reducing total user support; and, reducing public sector fraud. We are in the process of developing KPI targets, and developing a dashboard for benefits realisation. In doing so, we are working closely with HMT and the Evaluation Task Force in the development of this monitoring plan. We are also working with departments as they onboard to update our baseline assumptions, through the administration of a data collection instrument.","themes":["Cost & funding","Delivery & schedule","Technical & integration","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. The GOV.UK One Login programme continued to deliver at pace in 2022/23, successfully meeting its major planned milestones. These included the launch of One Login's…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2025-03-31. This is primarily due to the following factors. We are Amber at the end of 2022/23 due to the pace and complexity of delivery, complicated technical solutions, Cyber and Information security, and stakeholder challenges. We have multiple services and accessibility issues to consider which makes this a very technical and challenging programme within the product development space. Overall confidence is increasing following the upturn in recruitment, careful planning and effective risk management. Onboarding of the first set of services has given further confidence in completion of the programme as scheduled in 2025.","narrativeClaimKind":null},{"id":"CO_0033_2122-Q1","year":2024,"name":"GOV.UK One Login","department":"CO","category":"ICT","description":"The programme has continued to scale-up; 30 government services are now live, including the HM Armed Forces Veteran Card; we remain on track to onboard 145 services by the end of 2024/25. More than 4.1 million people have so far proven their identity through One Login, with over 5 million downloads of the One Login identity checking app._x000D_ _x000D_ One Login's phased onboarding of HMRC users began, as planned, on 29 February; since then, internal users have successfully been testing the end-to-end journey. Other key developments include:_x000D_ _x000D_ * New data sharing legislation under the Digital Economy Act 2017 came into force on 8 February 2024, enabling One Login to access a wider range of data held by departments, and thus improve its identity verification options._x000D_ * The programme has developed an additional identity checking route for users without photographic documentation_x000D_ * The Chief Secretary to HMT approved One Login's Full Business Case.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. Delivery confidence remains at AMBER. A combination of headcount restrictions and no corresponding budget increase in 2024/25 would leave GOV.UK One Login with insufficient capacity to complete all of the work originally planned for this financial year. The programme is taking a number of steps to mitigate the risks including engaging with senior Cabinet Office risk governance groups.","startDate":"2021-01-04","endDate":"2025-03-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2025-03-31. This is primarily due to the following factors. The programme remains on track to achieve its core deliverables: to onboard 145 services - and their users - by the end of 2024/25; to operate an increasingly resilient, secure and inclusive live system, with multiple ways for people to prove their identity; to provide effective customer support; and to realise significant financial benefits for government_x000D_ _x000D_ The programme is rated Amber at the end of 2023/24 due to complexity of delivery; One Login is a multi-faceted technical solution, with a wide range of stakeholders and a challenging pace of delivery. The programme is, therefore, understandably managing a number of significant risks and issues. The programme has continued to strengthen its risk management processes over the past 12 months to ensure clearer escalation routes and implementation of treatments, as recognised in the IPA's Gate 4 review in November 2023.","fyBaseline":127.53,"fyForecast":127.61,"fyVariance":0.0,"varianceNarrative":"The budget variance is inferior or equal to 5%.","wholeLifeCost":329.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 increased from 305m. to 329m. This is primarily due to the following factors. The 305m covers the 3 year SR21 period for which funding has been agreed in the financial case of the current business case.","benefits":1981.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 2324-Q4 increased from 1752m. to 1981m. The GOV.UK One Login programme's Full Business Case, which has been approved by Cabinet Office and HM Treasury ministers, forecasted significant financial benefits. These include: reduced user authentication and identity verification costs to government; savings due to increased online accessibility and reduced reliance on more expensive offline routes; avoided duplicative spend across government on systems; and avoided fraud.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. Delivery confidence remains at AMBER. A combination of headcount restrictions and no corresponding budget increase in 2024/25 would leave GOV.UK One Login with…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2025-03-31. This is primarily due to the following factors. The programme remains on track to achieve its core deliverables: to onboard 145 services - and their users - by the end of 2024/25; to operate an increasingly resilient, secure and inclusive live system, with multiple ways for people to prove their identity; to provide effective customer support; and to realise significant financial benefits for government_x000D_ _x000D_ The programme is rated Amber at the end of 2023/24 due to complexity of delivery; One Login is a multi-faceted technical solution, with a wide range of stakeholders and a challenging pace of delivery. The programme is, therefore, understandably managing a number of significant risks and issues. The programme has continued to strengthen its risk management processes over the past 12 months to ensure clearer escalation routes and implementation of treatments, as recognised in the IPA's Gate 4 review in November 2023.","narrativeClaimKind":null},{"id":"CO_0033_2122-Q1","year":2025,"name":"GOV.UK One Login","department":"DSIT","category":"ICT","description":"GOV.UK One Login, provides a single way for users to create an account, log in, and prove their identity to access all central government services. It replaces the previous landscape of siloed and duplicative sign-in and identity-proofing methods, providing one ‘front door’ for connected services that will continue to be operated by departments. This consolidation eliminates inefficiencies from a fragmented system of 190 individual accounts and 44 different sign-in methods. By streamlining access, this consolidation reduces costs, lowers the risk of fraud, enhances inclusion, and significantly improves the user experience, amplifying benefits to both government and citizens, ensuring it remains the ‘market-leading’ account and identity verification solution across government.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The AMBER rating reflects steady progress and strong momentum across delivery milestones, including a growing number of live services and expanded user adoption. The SRO SQA rating was driven by the programme’s demonstrable operational maturity, sustained leadership support, and positive onboarding decisions from major departments such as HMRC and DVLA over the last FY. The rating remains AMBER due to the complexity of the roadmap and ongoing dependencies on other departments for onboarding and benefits realisation. These interdependencies present delivery risks that require continued active management. The scaling of internal capabilities and steps taken on accessibility and digital inclusion are progressing positively, but overall deliverability is still contingent on cross-government alignment and sustained engagement.","startDate":"2021-01-04","endDate":"2028-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2025 to 31/03/2028. This is primarily due to the following factors‚ The schedule has been increased in this ARMP cycle, reflecting strong delivery progress and alignment with planned milestones. Key motivators for this decision include the continued expansion of live services, the successful onboarding of significant departments (HMRC in Private Beta, DVLA, a first DWP service and some devolved administrations; e.g. Welsh Gov), and the projected scaling of user adoption. The decision to keep the programme on the GMPP for a further 3 years supports the ambition to complete onboarding of all central government services. While the programme continues to meet key internal delivery targets, the schedule remains dependent on departmental onboarding timelines and the coordination of benefits realisation across government. The leading issue facing the programme relates to ‘Service Migration’, however a number of treatments and mitigations are in place to effectively counteract service onboarding slippage. The Programme continues to iterate a features roadmap which captures the initiatives and functionality that will be delivered over the next 3 Financial years. This is closely aligned with our onboarding and migration roadmap, which shows the future ‘pipeline’ of services that will move to One Login between now and when the programme reaches critical mass. These dependencies introduce a level of complexity, but no material delays have occurred that would necessitate a change to the overall timeline.","fyBaseline":133.7,"fyForecast":129.91,"fyVariance":2.83,"varianceNarrative":"The budget variance is less than or equal to 5%. As outlined below, there was an overspend during the FY 24/25 which was settled in a DSIT Investment Committee increasing the Programmes Whole Life Cost. Because of this amount being regularised and the funding envelope for One Login increased, there was no overspend by the end of the Financial Year 24/25.","wholeLifeCost":342.19,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased. This is primarily due to the following factors‚ additional funding was received via an Investment Committee and agreed between Perm Secretaries of DSIT and Cabinet Office and an addendum to the Business Case prepared. Key factors that motivated the increase in WLC in FY 24/25 were; 1. onboarding complexities that led to delays in the onboarding of key Reliant Parties this year, 2. Emergent cyber security risks related to geo political events requiring increased resilience in order to protect the programme from cyber threats, and 3. increased reliance on more expensive Managed Service Providers and Contingent Labour contractors as a result of Civil Service headcount caps which meant the Programme could not recruit Civil Servants into these roles. Significant progress has been made against each of these factors.","benefits":3641.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased. This is primarily due to the following factors‚ The economic benefits realised by One Login increased in 2024/25 compared to 2023/24 as more services onboarded onto the programme. The benefits of the One Login programme exceeded costs in 2024/25. However, benefits were not as high as had originally been forecast. This was due to delays in some services onboarding to the programme. The benefits process in its current iteration has reached steady state. We have moved over to a more automated process for service volumes. We are now working on further improvements to the benefits modelling.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Technical & integration"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The AMBER rating reflects steady progress and strong momentum across delivery milestones, including a growing number of live services and expanded user adoption. The…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2025 to 31/03/2028. This is primarily due to the following factors‚ The schedule has been increased in this ARMP cycle, reflecting strong delivery progress and alignment with planned milestones. Key motivators for this decision include the continued expansion of live services, the successful onboarding of significant departments (HMRC in Private Beta, DVLA, a first DWP service and some devolved administrations; e.g. Welsh Gov), and the projected scaling of user adoption. The decision to keep the programme on the GMPP for a further 3 years supports the ambition to complete onboarding of all central government services. While the programme continues to meet key internal delivery targets, the schedule remains dependent on departmental onboarding timelines and the coordination of benefits realisation across government. The leading issue facing the programme relates to ‘Service Migration’, however a number of treatments and mitigations are in place to effectively counteract service onboarding slippage. The Programme continues to iterate a features roadmap which captures the initiatives and functionality that will be delivered over the next 3 Financial years. This is closely aligned with our onboarding and migration roadmap, which shows the future ‘pipeline’ of services that will move to One Login between now and when the programme reaches critical mass. These dependencies introduce a level of complexity, but no material delays have occurred that would necessitate a change to the overall timeline.","narrativeClaimKind":null},{"id":"CO_0033_2122-Q1","year":2026,"name":"GOV.UK One Login","department":"DSIT","category":"Government Transformation and Service Delivery","description":"GOV.UK One Login is being developed as the single sign-on and identity verification front door for accessing government services. This will replace up to 300 individual accounts, accessed via 44 different sign-in methods; and will provide a significantly improved user experience. Our aim is to make it as simple, inclusive, and secure as possible for individuals to prove their identity and access connected services, while protecting them and the government from the risks of fraud.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors that‚ GOV.UK One Login is continuing to scale, with over 200 services already onboarded, for example apply for a Disclosure and Barring Service (DBS) check, and sign a mortgage deed .Over time, all central government services will be accessible through GOV.UK One Login. Over 15 million people have proven who they are through One Login, and its identity verification app - which has a rating of 4.6* on Android and iOS stores respectively - has been downloaded more than 16 million times.","startDate":"2021-01-04","endDate":"2028-03-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same which is 31st March 28 which covers the length of the approved Full Business Case which is running from 25/26 to 27/28 and has been approved by HM Treasury.","fyBaseline":120.24,"fyForecast":127.09,"fyVariance":5.7,"varianceNarrative":"The budget variance is less than or equal to 5%","wholeLifeCost":708.86,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) increased due to a successful new Full Business Case being approved at DSIT Investment Committee and HM Treasury Approvals Panel which provided GDS with the funding to continue the programme for another 3 financial years.","benefits":4731.89,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed benefits at 25/26-Q4 (measured in £m) increased due to the continuation of One Login as a funded programme. Its projected benefits were scrutinised by HM Treasury and will far outweigh financial investment into the programme.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors that‚ GOV.UK One Login is continuing to scale, with over 200 services already onboarded, for example apply for a Disclosure and Barring Service (DBS) check, and sign a mortgage deed…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same which is 31st March 28 which covers the length of the approved Full Business Case which is running from 25/26 to 27/28 and has been approved by HM Treasury.","narrativeClaimKind":null}],"previous":{"id":"CO_0033_2122-Q1","year":2025,"name":"GOV.UK One Login","department":"DSIT","category":"ICT","description":"GOV.UK One Login, provides a single way for users to create an account, log in, and prove their identity to access all central government services. It replaces the previous landscape of siloed and duplicative sign-in and identity-proofing methods, providing one ‘front door’ for connected services that will continue to be operated by departments. This consolidation eliminates inefficiencies from a fragmented system of 190 individual accounts and 44 different sign-in methods. By streamlining access, this consolidation reduces costs, lowers the risk of fraud, enhances inclusion, and significantly improves the user experience, amplifying benefits to both government and citizens, ensuring it remains the ‘market-leading’ account and identity verification solution across government.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The AMBER rating reflects steady progress and strong momentum across delivery milestones, including a growing number of live services and expanded user adoption. The SRO SQA rating was driven by the programme’s demonstrable operational maturity, sustained leadership support, and positive onboarding decisions from major departments such as HMRC and DVLA over the last FY. The rating remains AMBER due to the complexity of the roadmap and ongoing dependencies on other departments for onboarding and benefits realisation. These interdependencies present delivery risks that require continued active management. The scaling of internal capabilities and steps taken on accessibility and digital inclusion are progressing positively, but overall deliverability is still contingent on cross-government alignment and sustained engagement.","startDate":"2021-01-04","endDate":"2028-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2025 to 31/03/2028. This is primarily due to the following factors‚ The schedule has been increased in this ARMP cycle, reflecting strong delivery progress and alignment with planned milestones. Key motivators for this decision include the continued expansion of live services, the successful onboarding of significant departments (HMRC in Private Beta, DVLA, a first DWP service and some devolved administrations; e.g. Welsh Gov), and the projected scaling of user adoption. The decision to keep the programme on the GMPP for a further 3 years supports the ambition to complete onboarding of all central government services. While the programme continues to meet key internal delivery targets, the schedule remains dependent on departmental onboarding timelines and the coordination of benefits realisation across government. The leading issue facing the programme relates to ‘Service Migration’, however a number of treatments and mitigations are in place to effectively counteract service onboarding slippage. The Programme continues to iterate a features roadmap which captures the initiatives and functionality that will be delivered over the next 3 Financial years. This is closely aligned with our onboarding and migration roadmap, which shows the future ‘pipeline’ of services that will move to One Login between now and when the programme reaches critical mass. These dependencies introduce a level of complexity, but no material delays have occurred that would necessitate a change to the overall timeline.","fyBaseline":133.7,"fyForecast":129.91,"fyVariance":2.83,"varianceNarrative":"The budget variance is less than or equal to 5%. As outlined below, there was an overspend during the FY 24/25 which was settled in a DSIT Investment Committee increasing the Programmes Whole Life Cost. Because of this amount being regularised and the funding envelope for One Login increased, there was no overspend by the end of the Financial Year 24/25.","wholeLifeCost":342.19,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased. This is primarily due to the following factors‚ additional funding was received via an Investment Committee and agreed between Perm Secretaries of DSIT and Cabinet Office and an addendum to the Business Case prepared. Key factors that motivated the increase in WLC in FY 24/25 were; 1. onboarding complexities that led to delays in the onboarding of key Reliant Parties this year, 2. Emergent cyber security risks related to geo political events requiring increased resilience in order to protect the programme from cyber threats, and 3. increased reliance on more expensive Managed Service Providers and Contingent Labour contractors as a result of Civil Service headcount caps which meant the Programme could not recruit Civil Servants into these roles. Significant progress has been made against each of these factors.","benefits":3641.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased. This is primarily due to the following factors‚ The economic benefits realised by One Login increased in 2024/25 compared to 2023/24 as more services onboarded onto the programme. The benefits of the One Login programme exceeded costs in 2024/25. However, benefits were not as high as had originally been forecast. This was due to delays in some services onboarding to the programme. The benefits process in its current iteration has reached steady state. We have moved over to a more automated process for service volumes. We are now working on further improvements to the benefits modelling.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Technical & integration"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The AMBER rating reflects steady progress and strong momentum across delivery milestones, including a growing number of live services and expanded user adoption. The…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2025 to 31/03/2028. This is primarily due to the following factors‚ The schedule has been increased in this ARMP cycle, reflecting strong delivery progress and alignment with planned milestones. Key motivators for this decision include the continued expansion of live services, the successful onboarding of significant departments (HMRC in Private Beta, DVLA, a first DWP service and some devolved administrations; e.g. Welsh Gov), and the projected scaling of user adoption. The decision to keep the programme on the GMPP for a further 3 years supports the ambition to complete onboarding of all central government services. While the programme continues to meet key internal delivery targets, the schedule remains dependent on departmental onboarding timelines and the coordination of benefits realisation across government. The leading issue facing the programme relates to ‘Service Migration’, however a number of treatments and mitigations are in place to effectively counteract service onboarding slippage. The Programme continues to iterate a features roadmap which captures the initiatives and functionality that will be delivered over the next 3 Financial years. This is closely aligned with our onboarding and migration roadmap, which shows the future ‘pipeline’ of services that will move to One Login between now and when the programme reaches critical mass. These dependencies introduce a level of complexity, but no material delays have occurred that would necessitate a change to the overall timeline.","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":0,"attentionScore":20,"attentionReasons":["Current published delivery confidence is Amber","In-year forecast variance is +5.7%"]},{"id":"DHSC_0067_2021-Q3","year":2026,"name":"INTEGRATED SINGLE FINANCIAL ENVIRONMENT","department":"DHSC","category":"Information and Communications Technology (ICT)","description":"The objective of the programme is to procure and implement the next generation of the NHS England Group Integrated Single Financial Environment (ISFE) and associated financial services. This is due to the expiry of the existing service provision contract. The procurement is for a managed service provision which must include a Financial and Accounting system as part of the service. The service is for the NHS England Group of organisations which consists of NHS England, 42 Integrated Care Boards (ICBs), 4Commissioning Support Units (CSU) and the Health Service Safety Investigations Body (HSSIB). The annual funding for the NHS England Group is £180 billion. This funding is managed through the financial and accounting system resulting in payments being made between the NHS England Group to provider organisations (Trusts & Foundation Trusts), commercial suppliers, General Practitioners (GPs), Opticians, Dentists, Pharmacists, as well as the general running costs of the organisation, e.g. payroll.","ipaDca":"Green","sroDca":null,"deliveryConfidence":"Green","deliveryConfidenceSource":"Independent assurance","commentary":"NISTA/SRO Delivery Confidence Assessment (DCA) rating was AMBER following the NISTA Gate 4 review on 07/07/2025. The programme implemented the recommendations from that review and successfully went live on 01/10/2025. Therefore the SRO confidence at 31/03/2026 is GREEN. The Gate 5 assurance review is due to take place the week commencing 11/05/2026.","startDate":"2018-08-01","endDate":"2026-03-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 changed from 31/10/2024 to 28/02/2026. This was because the programme go-live date was delayed by 18 months, the business case for the revised go-live date of 01/10/2025 was only approved in September 2025 and therefore this is the first opportunity to update the completion date.","fyBaseline":25.05,"fyForecast":24.81,"fyVariance":0.97,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":187.99,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 remained the same.","benefits":177.08,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 remained the same.","themes":["Governance & assurance","Cost & funding","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"NISTA/SRO Delivery Confidence Assessment (DCA) rating was AMBER following the NISTA Gate 4 review on 07/07/2025. The programme implemented the recommendations from that review and successfully went live on 01/10/2025. Therefore the SRO confidence at 31/03/2026 is GREEN. The Gate 5 assurance review is due to take place the week commencing 11/05/2026.…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 changed from 31/10/2024 to 28/02/2026. This was because the programme go-live date was delayed by 18 months, the business case for the revised go-live date of 01/10/2025 was only approved in September 2025 and therefore this is the first opportunity to update the completion date.","narrativeClaimKind":null,"history":[{"id":"DHSC_0067_2021-Q3","year":2021,"name":"Integrated Single Financial Environment","department":"DHSC","category":"ICT","description":"The objective of the project is to procure the next generation of the NHS England group and NHSI Integrated Single Financial Environment (ISFE) and associated financial services. The procurement is for a managed service provision which must include a Financial and Accounting system as part of the service to commence in April 2024.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Red.This is primarily due to the following factors: While we consider the overall delivery confidence for the project to be amber/green, there are some areas that need to be urgently addressed in order to achieve delivery, specifically in relation to access to sufficient resource in some key areas such as commercial strategy and project management support","startDate":"2018-08-01","endDate":"2024-10-31","scheduleNarrative":"The project end-date is 31 October 2024. This is primarily due to the following factors: The project end date remains as 31 October 2024. There have been some delays in the Outline Business case reaching the approvals stage as a result of further work required on the content based on feedback received, however we don't anticipate any change to the forecast project end date","fyBaseline":0.23,"fyForecast":0.23,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":300.69,"costNarrative":"The projects Baseline Whole Life Cost is �300.69m. This is primarily due to the following factors: The budgeted whole life cost for the project is based on financial modelling of the re-provision of the Integrated Single Financial Environment service. The service will be subject to procurement and potential variability depending on supplier pricing.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Red.This is primarily due to the following factors: While we consider the overall delivery confidence for the project to be amber/green, there are some areas that need to be urgently addressed in order to achieve delivery, specifically in relation to access to sufficient…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project end-date is 31 October 2024. This is primarily due to the following factors: The project end date remains as 31 October 2024. There have been some delays in the Outline Business case reaching the approvals stage as a result of further work required on the content based on feedback received, however we don't anticipate any change to the forecast project end date","narrativeClaimKind":null},{"id":"DHSC_0067_2021-Q3","year":2022,"name":"Integrated Single Financial Environment","department":"DHSC","category":"ICT","description":"The objective of the project is to procure the next generation of the NHS England group Integrated Siingle Finnacial Environment (ISFE) and associated financial services. The procurement is for a managed service provision which must include a Financial and Accounting system as part of the service to commence in April 2024.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 decreased from Red to Amber Recommendations in place from the AAP review undertaken in August 2021 have been actioned. The Outline Business Case for the project has received approval from DHSC, Cabinet Office and HMT, with conditions. All pre-procurement conditions have been met and the remainder are built into Full Business Case development plans. Resource remains under ongoiing review to ensure we have the capacity and capability to deliver current and future stages of the project. While the project is on track to deliver, there remains limited contingency within the plans, so it is critical that we maintain momentum, hence the amber rating. .","startDate":"2018-08-01","endDate":"2024-10-31","scheduleNarrative":"Compared to 2021-Q4, your project end-date remained scheduled to finish on 31 OCT 2024 . This is primarily due to the following factors: The project end date remains as 31 October 2024.. The project is on-track to deliver in accordance with planned schedule.","fyBaseline":0.23,"fyForecast":0.73,"fyVariance":217.0,"varianceNarrative":"The budget variance exceeds 5%. The budget for delivery of the project was exceeded due to an increase in resource following critical recommendations from an IPA review.","wholeLifeCost":301.0,"costNarrative":"Compared to 2021-Q4,the projects Baseline Whole Life Cost remained at 300.69 (£m). This is primarily due to the following factors: The budgeted whole life cost for the project is based on financial modelling of the re-provision of the Integrated Single Financial Environment service. The service is subject to procurement and costs are subject to variability depending on supplier pricing.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Workforce & capability","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 decreased from Red to Amber Recommendations in place from the AAP review undertaken in August 2021 have been actioned. The Outline Business Case for the project has received approval from DHSC, Cabinet Office and HMT, with…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to 2021-Q4, your project end-date remained scheduled to finish on 31 OCT 2024 . This is primarily due to the following factors: The project end date remains as 31 October 2024.. The project is on-track to deliver in accordance with planned schedule.","narrativeClaimKind":null},{"id":"DHSC_0067_2021-Q3","year":2023,"name":"Integrated Single Financial Environment","department":"DHSC","category":"ICT","description":"The objective of the project is to procure and implement the next generation of the NHSE England group Integrated Single Financial Environment (ISFE) and associated financial services. The procurement phase of the project is now complete and a contract is in place with NHS Shared Business Services (NHS SBS). Implementation is underway for the managed service provision to commence in April 2024.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber (SRO rating). This is primarily due to the following factors. The has been no change in the DCA, which remains at amber. Steps have been taken to minimise delivery risk, such as adopting early implementation of activities where possible, running activities in parallel and adopting an agile approach, however there is limited contingency available in the plan should there be any slippage, hence the amber rating.","startDate":"2018-08-01","endDate":"2024-10-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2024-10-31. This is primarily due to the following factors. There has been no change to the project end-date, which is 31 Oct 2024.","fyBaseline":6.7,"fyForecast":5.23,"fyVariance":-22.0,"varianceNarrative":"The budget variance exceeds 5%. The budget for delivery of the project was exceeded due to an increase in resource following critical recommendation from an IPA review.","wholeLifeCost":301.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 remained at 301m. This is primarily due to the following factors. The Baseline Whole Life Cost is based on submitted bid costs.","benefits":37.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 37m. The project's departmental-agree monetised benefits at 22/23-Q4 is 37m.The project's departmental-agree monetised benefits at 22/23-Q4 is 37m.The project's departmental-agree monetised benefits at 22/23-Q4 is 37m. Monetised benefits have been updated to reflect the succesful bid submission.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber (SRO rating). This is primarily due to the following factors. The has been no change in the DCA, which remains at amber. Steps have been taken to minimise delivery risk, such as adopting early implementation of activities where possible, running…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2024-10-31. This is primarily due to the following factors. There has been no change to the project end-date, which is 31 Oct 2024.","narrativeClaimKind":null},{"id":"DHSC_0067_2021-Q3","year":2024,"name":"Integrated Single Financial Environment","department":"DHSC","category":"ICT","description":"The objective of the project is to procure and implement the next generation of the NHS England Group Integrated Single Financial Environment (ISFE) and associated financial services. Due to the expiry of the existing service provision contract. The procurement is for a managed service provision which must include a Financial and Accounting system as part of the service._x000D_ The service is for the NHS England Group of organisations which consists of 42 Integrated Care Boards (ICBs) 4 Commissioning Support Units (CSUs), NHS England and a provider organisation. The annual funding for NHS England Group is 170 billion. This funding is managed through the financial and accounting system resulting in payments being made between the NHS England Group to Provider organisation (Trusts & FTs), commercial suppliers, General Practitioners (GPs), Opticians, Dentists, Pharmacists, Public Health, as well as the general running costs of an organisation e.g. payroll payments.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Delivery Confidence Assessment rating at 23/24-Q4 increased from Amber(SRO rating) to Red(IPA rating). This is primarily due to the following factors. Following recommendations from a Red Gate 0 report in February 2024, an action plan is under development and the programme is undergoing a re-planning exercise to determine a new go-live date._x000D_ Progress against the action plan will be assessed in an Assurance of Action Plan (AAP) review scheduled for May 2024.","startDate":"2018-08-01","endDate":"2024-10-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2024-10-31. This is primarily due to the following factors. Go-live of the new service will be delayed beyond 1 April 2024,which will impact on project end date. A re-planning exercise is underway to determine new go-live and project end dates.","fyBaseline":9.8,"fyForecast":7.3,"fyVariance":-26.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. Due to the delay in go live the expected costs related to implementation support resource and milestone payments are lower than budgeted for. However the costs have effectively been deferred to 2024/25.","wholeLifeCost":218.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 decreased from 301m. to 218m. This is primarily due to the following factors. Baseline Whole Life Costs have been updated to reflect the 7 year contract period as approved by HMT. Optional extension costs are not included and remain subject to HMT approval.","benefits":37.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 37m. Monetised benefits have been updated to reflect the succesful bid submission.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Delivery Confidence Assessment rating at 23/24-Q4 increased from Amber(SRO rating) to Red(IPA rating). This is primarily due to the following factors. Following recommendations from a Red Gate 0 report in February 2024, an action plan is under development and the programme is undergoing a re-planning exercise to…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2024-10-31. This is primarily due to the following factors. Go-live of the new service will be delayed beyond 1 April 2024,which will impact on project end date. A re-planning exercise is underway to determine new go-live and project end dates.","narrativeClaimKind":null},{"id":"DHSC_0067_2021-Q3","year":2025,"name":"INTEGRATED SINGLE FINANCIAL ENVIRONMENT","department":"DHSC","category":"ICT","description":"The objective of the programme is to procure and implement the next generation of the NHS England Group Integrated Single Financial Environment (ISFE) and associated financial services. This is due to the expiry of the existing service provision contract. The procurement is for a managed service provision which must include a Financial and Accounting system as part of the service. The service is for the NHS England Group of organisations which consists of NHS England, forty-two Integrated Care Boards (ICBs), four Commissioning Support Units (CSU) and Health Service Safety Investigations Body (HSSIB). The annual funding for the NHS England Group is £180 billion. This funding is managed through the financial and accounting system resulting in payments being made between the NHS England Group to provider organisations (Trusts & Foundation Trusts), commercial suppliers, General Practitioners (GPs), Opticians, Dentists, Pharmacists, as well as the general running costs of the organisation, e.g. payroll.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from RED to AMBER. This is primarily due to the following factors: the programme has implemented the recommendations from the review of roles and responsibilities to ensure there is sufficient capacity and capability within the programme team as well as the suppliers to deliver it. Programme governance now reflects best practice with clear leadership on the strategic aims of the programme, appropriate monitoring and oversight of delivery, as well as strong risk and issue management. There is an updated programme plan with no overlap between critical phases which has been approved by the Programme Board and by key stakeholders.","startDate":"2018-08-01","endDate":"2024-10-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/10/2024. This is primarily due to the following factors: the project end date 31 October 2024 aligns with the current approved full business case, as agreed with the Department of Health and Social Care. The revised go-live date is 1 October 2025, with a programme end date of 30 April 2026. These will be agreed formally as part of the revised full business case, which is currently underway.","fyBaseline":18.99,"fyForecast":10.17,"fyVariance":46.48,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors: The baseline costs for 2024 - 2025 are based upon an original April 2024 go-live date in-line with the current approved full business case, as requested by the Department of Health and Social Care team. The current reported costs are based on the actual costs for 2024 - 2025 with the resulting underspend is due to the programme delay to go-live from April 2024 to October 2025. The forecast profile spend will be updated once a revised full business case is approved.","wholeLifeCost":208.98,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 218 to 208. This is primarily due to the following factors: that the £208 million figure is derived from the current approved full business case, whereas the £218 million are derived from the outline business case.","benefits":200.64,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 37 to 200. This is primarily due to the following factors: that the ISFE 2 benefits case is evaluated to be c£200 million, which reconciles to the approved full business case. This is a significant uplift on the £37 million, which was previously reported as part of the outline business case.","themes":["Cost & funding","Approvals & decisions","Governance & assurance","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from RED to AMBER. This is primarily due to the following factors: the programme has implemented the recommendations from the review of roles and responsibilities to ensure there is sufficient capacity and capability within…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/10/2024. This is primarily due to the following factors: the project end date 31 October 2024 aligns with the current approved full business case, as agreed with the Department of Health and Social Care. The revised go-live date is 1 October 2025, with a programme end date of 30 April 2026. These will be agreed formally as part of the revised full business case, which is currently underway.","narrativeClaimKind":null},{"id":"DHSC_0067_2021-Q3","year":2026,"name":"INTEGRATED SINGLE FINANCIAL ENVIRONMENT","department":"DHSC","category":"Information and Communications Technology (ICT)","description":"The objective of the programme is to procure and implement the next generation of the NHS England Group Integrated Single Financial Environment (ISFE) and associated financial services. This is due to the expiry of the existing service provision contract. The procurement is for a managed service provision which must include a Financial and Accounting system as part of the service. The service is for the NHS England Group of organisations which consists of NHS England, 42 Integrated Care Boards (ICBs), 4Commissioning Support Units (CSU) and the Health Service Safety Investigations Body (HSSIB). The annual funding for the NHS England Group is £180 billion. This funding is managed through the financial and accounting system resulting in payments being made between the NHS England Group to provider organisations (Trusts & Foundation Trusts), commercial suppliers, General Practitioners (GPs), Opticians, Dentists, Pharmacists, as well as the general running costs of the organisation, e.g. payroll.","ipaDca":"Green","sroDca":null,"deliveryConfidence":"Green","deliveryConfidenceSource":"Independent assurance","commentary":"NISTA/SRO Delivery Confidence Assessment (DCA) rating was AMBER following the NISTA Gate 4 review on 07/07/2025. The programme implemented the recommendations from that review and successfully went live on 01/10/2025. Therefore the SRO confidence at 31/03/2026 is GREEN. The Gate 5 assurance review is due to take place the week commencing 11/05/2026.","startDate":"2018-08-01","endDate":"2026-03-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 changed from 31/10/2024 to 28/02/2026. This was because the programme go-live date was delayed by 18 months, the business case for the revised go-live date of 01/10/2025 was only approved in September 2025 and therefore this is the first opportunity to update the completion date.","fyBaseline":25.05,"fyForecast":24.81,"fyVariance":0.97,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":187.99,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 remained the same.","benefits":177.08,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 remained the same.","themes":["Governance & assurance","Cost & funding","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"NISTA/SRO Delivery Confidence Assessment (DCA) rating was AMBER following the NISTA Gate 4 review on 07/07/2025. The programme implemented the recommendations from that review and successfully went live on 01/10/2025. Therefore the SRO confidence at 31/03/2026 is GREEN. The Gate 5 assurance review is due to take place the week commencing 11/05/2026.…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 changed from 31/10/2024 to 28/02/2026. This was because the programme go-live date was delayed by 18 months, the business case for the revised go-live date of 01/10/2025 was only approved in September 2025 and therefore this is the first opportunity to update the completion date.","narrativeClaimKind":null}],"previous":{"id":"DHSC_0067_2021-Q3","year":2025,"name":"INTEGRATED SINGLE FINANCIAL ENVIRONMENT","department":"DHSC","category":"ICT","description":"The objective of the programme is to procure and implement the next generation of the NHS England Group Integrated Single Financial Environment (ISFE) and associated financial services. This is due to the expiry of the existing service provision contract. The procurement is for a managed service provision which must include a Financial and Accounting system as part of the service. The service is for the NHS England Group of organisations which consists of NHS England, forty-two Integrated Care Boards (ICBs), four Commissioning Support Units (CSU) and Health Service Safety Investigations Body (HSSIB). The annual funding for the NHS England Group is £180 billion. This funding is managed through the financial and accounting system resulting in payments being made between the NHS England Group to provider organisations (Trusts & Foundation Trusts), commercial suppliers, General Practitioners (GPs), Opticians, Dentists, Pharmacists, as well as the general running costs of the organisation, e.g. payroll.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from RED to AMBER. This is primarily due to the following factors: the programme has implemented the recommendations from the review of roles and responsibilities to ensure there is sufficient capacity and capability within the programme team as well as the suppliers to deliver it. Programme governance now reflects best practice with clear leadership on the strategic aims of the programme, appropriate monitoring and oversight of delivery, as well as strong risk and issue management. There is an updated programme plan with no overlap between critical phases which has been approved by the Programme Board and by key stakeholders.","startDate":"2018-08-01","endDate":"2024-10-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/10/2024. This is primarily due to the following factors: the project end date 31 October 2024 aligns with the current approved full business case, as agreed with the Department of Health and Social Care. The revised go-live date is 1 October 2025, with a programme end date of 30 April 2026. These will be agreed formally as part of the revised full business case, which is currently underway.","fyBaseline":18.99,"fyForecast":10.17,"fyVariance":46.48,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors: The baseline costs for 2024 - 2025 are based upon an original April 2024 go-live date in-line with the current approved full business case, as requested by the Department of Health and Social Care team. The current reported costs are based on the actual costs for 2024 - 2025 with the resulting underspend is due to the programme delay to go-live from April 2024 to October 2025. The forecast profile spend will be updated once a revised full business case is approved.","wholeLifeCost":208.98,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 218 to 208. This is primarily due to the following factors: that the £208 million figure is derived from the current approved full business case, whereas the £218 million are derived from the outline business case.","benefits":200.64,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 37 to 200. This is primarily due to the following factors: that the ISFE 2 benefits case is evaluated to be c£200 million, which reconciles to the approved full business case. This is a significant uplift on the £37 million, which was previously reported as part of the outline business case.","themes":["Cost & funding","Approvals & decisions","Governance & assurance","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from RED to AMBER. This is primarily due to the following factors: the programme has implemented the recommendations from the review of roles and responsibilities to ensure there is sufficient capacity and capability within…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/10/2024. This is primarily due to the following factors: the project end date 31 October 2024 aligns with the current approved full business case, as agreed with the Department of Health and Social Care. The revised go-live date is 1 October 2025, with a programme end date of 30 April 2026. These will be agreed formally as part of the revised full business case, which is currently underway.","narrativeClaimKind":null},"ratingDelta":-1,"transition":"Improved","endDateDeltaDays":516,"attentionScore":20,"attentionReasons":["Published end date moved 516 days later"]},{"id":"HMRC_0143_2223-Q2","year":2026,"name":"VOA NextGen Rating Programme","department":"VOA","category":"Government Transformation and Service Delivery","description":"The NextGen Rating Programme (NGR) is replacing VOA’s multiple legacy technologies for Non-Domestic Rating, digitising casework processes and customer interactions into a single integrated system. It also set out to deliver measures from the last Government’s Business Rates Review and Non-Domestic Rating Act (2023). The programme is continuing to deliver commitments on greater transparency on valuations for customers, and work is continuing on potential options for a streamlined process for challenging valuations. The programme supports the government’s ambition for a more responsive and fairer business rates system, including the move from five-yearly to three-yearly revaluations from 2023.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Since the creation of the NextGen Rating Programme in October 2024, Programme teams are well established with strong governance and oversight, supported by robust supplier and financial management. This mature position has been reinforced by NISTA, who awarded the programme a Green rating in a Gate 0/3 review in January 2026. During FY25/26 the Programme delivered the first major milestones, with Disclosure and changes to support Improvement Relief for Revaluation 2026 going live in November 2025. The design and build of the core online service has been completed, with progression into Private Beta held while rollout plans are reviewed. Progress for the internal Valuation Operating System (VOS) for Non-Domestic Rating is well advanced. Release 1 (Pre-Valuation) remains on track for July 2026, followed by Release 2 (Valuation) by November 2026. Focus remains on managing testing, defect resolution and data migration, alongside supporting business readiness for upcoming changes. The Amber delivery confidence assessment reflects the need to deliver VOS Releases 1 and 2 to tight timelines, alongside some remaining uncertainty on scope, sequencing and costs for later releases. Work is underway to finalise delivery plans and commercial arrangements for these later releases, supporting improved certainty and a return to Green.","startDate":"2024-10-01","endDate":"2030-04-01","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same, 01/04/2030.","fyBaseline":49.69,"fyForecast":46.94,"fyVariance":5.53,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to scope items being re-planned into later years of the Programme which reduced the projected 25/26 spend.","wholeLifeCost":300.38,"costNarrative":"Compared to financial year 24/25-Q4, the projects departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) remained at £328.5m.","benefits":216.77,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at £251m.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Scope & requirements"],"evidenceExcerpt":"Since the creation of the NextGen Rating Programme in October 2024, Programme teams are well established with strong governance and oversight, supported by robust supplier and financial management. This mature position has been reinforced by NISTA, who awarded the programme a Green rating in a Gate 0/3 review in January 2026. During FY25/26 the Programme…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same, 01/04/2030.","narrativeClaimKind":null,"history":[{"id":"HMRC_0143_2223-Q2","year":2023,"name":"VOA Non - Domestic Rating Reforms Programme","department":"VOA","category":"Government Transformation and Service Delivery","description":"The Non - Domestic Rating (NDR) Reforms Programme is a multi-year programme to deliver key commitments from the Governments 2021 Review of Business Rates. These include changes to the non-domestic rating system to enable a sustainable move to three- yearly revaluations, measures to provide greater transparency to ratepayers, and the implementation of new reliefs.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 is Amber. This is primarily due to the following factors. The Infrastructure Projects Authority assesses the overall Departmental Commentary Actions for the Non-Domestic Rating Reforms Programme to be Amber.This reflects the current uncertainty over the impact of delays to a separate Valuation Office Agency programme to replace legacy technology.The Review Team assessed that the issue is resolvable but will require constant management attention by the Programme. The Programme is undertaking a significant amount of work to manage the dependency and consider alternative delivery options as a contingency.","startDate":"2022-04-01","endDate":"2029-03-31","scheduleNarrative":"The project's end-date at 22/23-Q4 is 2029-03-31. This is primarily due to the following factors. The Programme is currently on plan but will need to impact the delay to legislation on delivery timelines.","fyBaseline":4.2,"fyForecast":4.2,"fyVariance":0.0,"varianceNarrative":"The GMPP project did not provide data","wholeLifeCost":110.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 22/23-Q4 is 110m. This is primarily due to the following factors. The programme is at an early stage having concluded its initial discovery stage. This informed the development of the Strategic Outline Business informed by order of magnitude IT costs, subsequently achieving His Majesty's Treasury Approval in January 2023. The next iteration of the Business Case (outline ) will be following the Alpha stage (testing prototypes and optimum customer journey assumptions) of the programme expected in Autumn 2023. This will produce refined Whole Life Cycle costs.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. The project did not provide departmental-agree monetised benefits at 22/23-Q4.The project did not provide departmental-agree monetised benefits at 22/23-Q4.The project did not provide departmental-agree monetised benefits at 22/23-Q4. We are working to quantify the economic benefit of more frequent revaluations that the programme enables, and consider whether it is appropriate to include this at Outline Business Case stage.","themes":["Delivery & schedule","Cost & funding","Technical & integration","Approvals & decisions"],"evidenceExcerpt":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 is Amber. This is primarily due to the following factors. The Infrastructure Projects Authority assesses the overall Departmental Commentary Actions for the Non-Domestic Rating Reforms Programme to be Amber.This reflects the current uncertainty over the impact of delays to a…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 22/23-Q4 is 2029-03-31. This is primarily due to the following factors. The Programme is currently on plan but will need to impact the delay to legislation on delivery timelines.","narrativeClaimKind":null},{"id":"HMRC_0143_2223-Q2","year":2024,"name":"VOA Non - Domestic Rating Reforms Programme","department":"VOA","category":"Government Transformation and Service Delivery","description":"The Non-Domestic Rating Reforms Programme (NDRR) continues to make good progress. It concluded its Alpha phase in April 2024 with a successful GDS assessment and has now moved into Beta. Improvement Relief, a headline measure from the Government's Business Rates Review and the Non-Domestic Rating Act (NDR) 2023, was delivered on 1 April 2024. The NDR Act has successfully completed its Parliamentary passage, gaining Royal Assent in autumn 2023. The Programme's Outline Business Case (OBC) has received internal approvals and is undergoing Treasury approval. An AO assessment has been completed, confirming that the programme meets the requirements of Managing Public Money. A summary will be published by the end of April.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. The overall Delivery Confidence Assessment for the NDR Reforms Programme is Amber. Work is ongoing to address risks in relation to long-term funding certainty, programme capability and capacity, and dependence on technology change in other programmes.","startDate":"2022-04-01","endDate":"2029-03-31","scheduleNarrative":"The project's end-date at 23/24-Q4 is 2029-03-31. This is primarily due to the following factors. The Programme has developed its plan based on the preferred option in the business case. The schedule remains on track. Dates for the introduction of new customer requirements and the disclosure of additional information on valuations will be confirmed in due course.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"","wholeLifeCost":286.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 increased from 110m. to 286m. This is primarily due to the following factors. Whole life costs have been reviewed and revised at Outline Business Case (OBC) stage.","benefits":333.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 2324-Q4 increased from 0m. to 333m.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Workforce & capability"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. The overall Delivery Confidence Assessment for the NDR Reforms Programme is Amber. Work is ongoing to address risks in relation to long-term funding certainty, programme capability and capacity, and dependence on…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 23/24-Q4 is 2029-03-31. This is primarily due to the following factors. The Programme has developed its plan based on the preferred option in the business case. The schedule remains on track. Dates for the introduction of new customer requirements and the disclosure of additional information on valuations will be confirmed in due course.","narrativeClaimKind":null},{"id":"HMRC_0143_2223-Q2","year":2025,"name":"VOA NextGen Rating Programme","department":"VOA","category":"Government Transformation and Service Delivery","description":"The NextGen Rating Programme (NGR) is replacing VOA’s legacy technology for Non-Domestic Rating, digitising casework processes and customer interactions, and delivering measures from the last Government’s Business Rates Review and Non-Domestic Rating Act (2023). It will introduce a new legal duty on property occupiers to supply valuation-relevant information on an events-driven basis (‘the Information Duty’), underpinned by a new compliance regime; greater transparency on valuations for customers; and a streamlined process for challenging valuations. The programme supports the government’s ambition for a more responsive and fairer business rates system, including the move from five-yearly to three-yearly revaluations from 2023.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ FY23/24 Q4 data referred to the Non-Domestic Rating Reform (NDRR) Programme. During FY24/25, NDRR merged with the Non-Domestic Rating elements of the Business Systems Transformation (BST) Programme to form the single NextGen Rating (NGR) Programme. The VOA ExCom agreed to progress the merger of the two programmes to form NGR, following a NISTA review of BST in February 2024. NGR was formally launched as a single new programme on 1 October 2024. This merger has the benefit of ensuring the end-to-end delivery of all the VOA’s Non-Domestic Rating reforms are being managed in one place, strengthening governance and oversight, programme controls and the management of cross-dependencies. Due to this change in scope, it is important to note that the Delivery Confidence Assessment from FY2023/24 (NDRR Programme) should not be compared with the Delivery Confidence Assessment from FY2024/25 (the combined single GMPP NextGen Rating Programme).","startDate":"2024-10-01","endDate":"2030-04-01","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2029 to 01/04/2030. This is primarily due to the following factors‚ FY23/24 Q4 data referred to the Non-Domestic Rating Reform (NDRR) Programme. During FY24/25, NDRR merged with the Non-Domestic Rating elements of the Business Systems Transformation (BST) Programme to form the NextGen Rating (NGR) Programme. NGR formally launched as a new programme on 1 October 2024. The programme end date has been refreshed in line with the new NGR Programme Business Case and baseline plan (approved by NISTA - Nov’24, HMT - Dec’24 & HMRC CIDC - Mar’25). The new baseline plan ensures the programme has sufficient contingency in place for early life support following the mandating of Information Duty in 2029.","fyBaseline":25.67,"fyForecast":20.2,"fyVariance":21.31,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The NextGen Rating programme had an underspend in FY24/25. This is due to several factors: • Managed Service Provider appointment: Previous estimates were based on an average view of supplier rate cards as the new supplier had not yet been appointed. The appointed supplier rate card is lower than the averages initially used to forecast. • Slower onboarding: Due to a longer procurement and onboarding process, there were slight delays in the start of the Manager Service Provider which meant delays in spend. • Release approach: The programme took the decision to split the technical build into a release approach as opposed to ‘big-bang’ to minimise delivery risk. This has meant less spend than anticipated in FY24/25 with greater than expected spend in later years. This will be managed in line with the agreed programme funding envelope, as per the Programme Business Case.","wholeLifeCost":328.5,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 286 to 328. This is primarily due to the following factors‚ FY23/24 Q4 data referred to the Non-Domestic Rating Reform (NDRR) Programme. During FY24/25, NDRR merged with the Non-Domestic Rating elements of the Business Systems Transformation (BST) Programme to form the NextGen Rating (NGR) Programme. NGR formally launched as a new programme on 1 October 2024. Programme Whole Life Costs (WLC) have been refreshed in line with the new NGR Programme Business Case which was approved by HMT in December 2024. The WLC therefore cannot be compared across FY2023/24 (NDR-R WLC) and FY2024/25 (NGR WLC).","benefits":251.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) decreased from 333 to 251. This is primarily due to the following factors‚ FY23/24 Q4 data referred to the Non-Domestic Rating Reform (NDRR) Programme. During FY24/25, NDRR merged with the Non-Domestic Rating elements of the Business Systems Transformation (BST) Programme to form the NextGen Rating (NGR) Programme. NGR formally launched as a new programme on 1 October 2024. Programme benefits have been refreshed in line with the new NGR Programme Business Case which was approved by HMT in December 2024.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ FY23/24 Q4 data referred to the Non-Domestic Rating Reform (NDRR) Programme. During FY24/25, NDRR merged with the Non-Domestic Rating elements of the Business Systems…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2029 to 01/04/2030. This is primarily due to the following factors‚ FY23/24 Q4 data referred to the Non-Domestic Rating Reform (NDRR) Programme. During FY24/25, NDRR merged with the Non-Domestic Rating elements of the Business Systems Transformation (BST) Programme to form the NextGen Rating (NGR) Programme. NGR formally launched as a new programme on 1 October 2024. The programme end date has been refreshed in line with the new NGR Programme Business Case and baseline plan (approved by NISTA - Nov’24, HMT - Dec’24 & HMRC CIDC - Mar’25). The new baseline plan ensures the programme has sufficient contingency in place for early life support following the mandating of Information Duty in 2029.","narrativeClaimKind":null},{"id":"HMRC_0143_2223-Q2","year":2026,"name":"VOA NextGen Rating Programme","department":"VOA","category":"Government Transformation and Service Delivery","description":"The NextGen Rating Programme (NGR) is replacing VOA’s multiple legacy technologies for Non-Domestic Rating, digitising casework processes and customer interactions into a single integrated system. It also set out to deliver measures from the last Government’s Business Rates Review and Non-Domestic Rating Act (2023). The programme is continuing to deliver commitments on greater transparency on valuations for customers, and work is continuing on potential options for a streamlined process for challenging valuations. The programme supports the government’s ambition for a more responsive and fairer business rates system, including the move from five-yearly to three-yearly revaluations from 2023.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Since the creation of the NextGen Rating Programme in October 2024, Programme teams are well established with strong governance and oversight, supported by robust supplier and financial management. This mature position has been reinforced by NISTA, who awarded the programme a Green rating in a Gate 0/3 review in January 2026. During FY25/26 the Programme delivered the first major milestones, with Disclosure and changes to support Improvement Relief for Revaluation 2026 going live in November 2025. The design and build of the core online service has been completed, with progression into Private Beta held while rollout plans are reviewed. Progress for the internal Valuation Operating System (VOS) for Non-Domestic Rating is well advanced. Release 1 (Pre-Valuation) remains on track for July 2026, followed by Release 2 (Valuation) by November 2026. Focus remains on managing testing, defect resolution and data migration, alongside supporting business readiness for upcoming changes. The Amber delivery confidence assessment reflects the need to deliver VOS Releases 1 and 2 to tight timelines, alongside some remaining uncertainty on scope, sequencing and costs for later releases. Work is underway to finalise delivery plans and commercial arrangements for these later releases, supporting improved certainty and a return to Green.","startDate":"2024-10-01","endDate":"2030-04-01","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same, 01/04/2030.","fyBaseline":49.69,"fyForecast":46.94,"fyVariance":5.53,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to scope items being re-planned into later years of the Programme which reduced the projected 25/26 spend.","wholeLifeCost":300.38,"costNarrative":"Compared to financial year 24/25-Q4, the projects departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) remained at £328.5m.","benefits":216.77,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at £251m.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Scope & requirements"],"evidenceExcerpt":"Since the creation of the NextGen Rating Programme in October 2024, Programme teams are well established with strong governance and oversight, supported by robust supplier and financial management. This mature position has been reinforced by NISTA, who awarded the programme a Green rating in a Gate 0/3 review in January 2026. During FY25/26 the Programme…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same, 01/04/2030.","narrativeClaimKind":null}],"previous":{"id":"HMRC_0143_2223-Q2","year":2025,"name":"VOA NextGen Rating Programme","department":"VOA","category":"Government Transformation and Service Delivery","description":"The NextGen Rating Programme (NGR) is replacing VOA’s legacy technology for Non-Domestic Rating, digitising casework processes and customer interactions, and delivering measures from the last Government’s Business Rates Review and Non-Domestic Rating Act (2023). It will introduce a new legal duty on property occupiers to supply valuation-relevant information on an events-driven basis (‘the Information Duty’), underpinned by a new compliance regime; greater transparency on valuations for customers; and a streamlined process for challenging valuations. The programme supports the government’s ambition for a more responsive and fairer business rates system, including the move from five-yearly to three-yearly revaluations from 2023.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ FY23/24 Q4 data referred to the Non-Domestic Rating Reform (NDRR) Programme. During FY24/25, NDRR merged with the Non-Domestic Rating elements of the Business Systems Transformation (BST) Programme to form the single NextGen Rating (NGR) Programme. The VOA ExCom agreed to progress the merger of the two programmes to form NGR, following a NISTA review of BST in February 2024. NGR was formally launched as a single new programme on 1 October 2024. This merger has the benefit of ensuring the end-to-end delivery of all the VOA’s Non-Domestic Rating reforms are being managed in one place, strengthening governance and oversight, programme controls and the management of cross-dependencies. Due to this change in scope, it is important to note that the Delivery Confidence Assessment from FY2023/24 (NDRR Programme) should not be compared with the Delivery Confidence Assessment from FY2024/25 (the combined single GMPP NextGen Rating Programme).","startDate":"2024-10-01","endDate":"2030-04-01","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2029 to 01/04/2030. This is primarily due to the following factors‚ FY23/24 Q4 data referred to the Non-Domestic Rating Reform (NDRR) Programme. During FY24/25, NDRR merged with the Non-Domestic Rating elements of the Business Systems Transformation (BST) Programme to form the NextGen Rating (NGR) Programme. NGR formally launched as a new programme on 1 October 2024. The programme end date has been refreshed in line with the new NGR Programme Business Case and baseline plan (approved by NISTA - Nov’24, HMT - Dec’24 & HMRC CIDC - Mar’25). The new baseline plan ensures the programme has sufficient contingency in place for early life support following the mandating of Information Duty in 2029.","fyBaseline":25.67,"fyForecast":20.2,"fyVariance":21.31,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The NextGen Rating programme had an underspend in FY24/25. This is due to several factors: • Managed Service Provider appointment: Previous estimates were based on an average view of supplier rate cards as the new supplier had not yet been appointed. The appointed supplier rate card is lower than the averages initially used to forecast. • Slower onboarding: Due to a longer procurement and onboarding process, there were slight delays in the start of the Manager Service Provider which meant delays in spend. • Release approach: The programme took the decision to split the technical build into a release approach as opposed to ‘big-bang’ to minimise delivery risk. This has meant less spend than anticipated in FY24/25 with greater than expected spend in later years. This will be managed in line with the agreed programme funding envelope, as per the Programme Business Case.","wholeLifeCost":328.5,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 286 to 328. This is primarily due to the following factors‚ FY23/24 Q4 data referred to the Non-Domestic Rating Reform (NDRR) Programme. During FY24/25, NDRR merged with the Non-Domestic Rating elements of the Business Systems Transformation (BST) Programme to form the NextGen Rating (NGR) Programme. NGR formally launched as a new programme on 1 October 2024. Programme Whole Life Costs (WLC) have been refreshed in line with the new NGR Programme Business Case which was approved by HMT in December 2024. The WLC therefore cannot be compared across FY2023/24 (NDR-R WLC) and FY2024/25 (NGR WLC).","benefits":251.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) decreased from 333 to 251. This is primarily due to the following factors‚ FY23/24 Q4 data referred to the Non-Domestic Rating Reform (NDRR) Programme. During FY24/25, NDRR merged with the Non-Domestic Rating elements of the Business Systems Transformation (BST) Programme to form the NextGen Rating (NGR) Programme. NGR formally launched as a new programme on 1 October 2024. Programme benefits have been refreshed in line with the new NGR Programme Business Case which was approved by HMT in December 2024.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ FY23/24 Q4 data referred to the Non-Domestic Rating Reform (NDRR) Programme. During FY24/25, NDRR merged with the Non-Domestic Rating elements of the Business Systems…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2029 to 01/04/2030. This is primarily due to the following factors‚ FY23/24 Q4 data referred to the Non-Domestic Rating Reform (NDRR) Programme. During FY24/25, NDRR merged with the Non-Domestic Rating elements of the Business Systems Transformation (BST) Programme to form the NextGen Rating (NGR) Programme. NGR formally launched as a new programme on 1 October 2024. The programme end date has been refreshed in line with the new NGR Programme Business Case and baseline plan (approved by NISTA - Nov’24, HMT - Dec’24 & HMRC CIDC - Mar’25). The new baseline plan ensures the programme has sufficient contingency in place for early life support following the mandating of Information Duty in 2029.","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":0,"attentionScore":20,"attentionReasons":["Current published delivery confidence is Amber","In-year forecast variance is +5.5%"]},{"id":"DCMS_0118_2223-Q1","year":2026,"name":"Youth Investment Fund","department":"DCMS","category":"Infrastructure and Construction","description":"Over £300 million to create, expand and improve youth facilities and services in England by September 2026. The Youth Investment Fund’s (YIF) objective is to create, expand and improve up to 300 local youth facilities and their services, in order to drive positive outcomes for young people, including improved mental and physical wellbeing, and skills for life and work. YIF is a commitment to young people to transform the out-of-school youth sector. It will provide truly innovative youth facilities in priority areas, and early-stage/seed resource funding to underpin them, enabling more positive activities that deliver improved outcomes for young people.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 the programme improved it's delivery confidence rating to Amber. This is primarily due to the following factors‚ the majority of projects within the programme have now been completed with the remainder due to be complete within the first half of the next financial year. This means we can be more confident that the last part of the year we are likely to deliver the programme's expected benefits.","startDate":"2022-04-01","endDate":null,"scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 increased from last year's published end-date to this year's published end-date, 31 March 2028. This is primarily due to the inclusion of the MMC workstream in the programme, end dates of which have slipped into 2026/27 FY; and the delivery of our benefits realisation programme then supports projects being financially viable one year after opening.","fyBaseline":47.84,"fyForecast":45.11,"fyVariance":5.71,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to some projects slipping into 26/27 with all remaining projects due to be completed in the first half of the next financial year.","wholeLifeCost":360.15,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) increased from last year's WLC 316.94m to 354.58m. This is primarily due to the actual costs for 25/26 and forecasted costs for 26/27 being accounted. Please note figures referenced in the narratives were entered as nominal and the system automatically converts them to Real Terms.","benefits":2437.88,"benefitsNarrative":"Compared to financial year 24/25 Q4 the projects departmentally agreed Benefits 2,455.29m has increased to this years Benefits total £2,922.600m. This is due to a programme model change, which decreased from 30 years to 20 years. This is reflective of the current re-modelling, with the FBC now inclusive of the MMC figure which provides a justification to this change.","themes":["Cost & funding","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 the programme improved it's delivery confidence rating to Amber. This is primarily due to the following factors‚ the majority of projects within the programme have now been completed with the remainder due to be complete within the first half of the…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 increased from last year's published end-date to this year's published end-date, 31 March 2028. This is primarily due to the inclusion of the MMC workstream in the programme, end dates of which have slipped into 2026/27 FY; and the delivery of our benefits realisation programme then supports projects being financially viable one year after opening.","narrativeClaimKind":null,"history":[{"id":"DCMS_0118_2223-Q1","year":2023,"name":"Youth Investment Fund","department":"DCMS","category":"Infrastructure and Construction","description":"The Youth Investment Funds (YIF) objective is to create, expand and improve local youth facilities and their services, in order to drive positive outcomes for young people, including improved mental and physical wellbeing, and skills for life and work.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 is Amber. This is primarily due to the following factors. The programme has developed a pipeline for assessing bids and allocating funding. This will inform in year controls and help track the construction and budgets.","startDate":"2022-04-01","endDate":"2025-03-31","scheduleNarrative":"The project's end-date at 22/23-Q4 is 2025-03-31. This is primarily due to the following factors. The programme is on track to deliver objectives by March 2025","fyBaseline":22.03,"fyForecast":18.87,"fyVariance":-14.0,"varianceNarrative":"The Youth Investment Fund saw substantial demand for capital funding, however, a significant number of applications were at too early a stage of development to be considered for the programme.The created an underspend for this financial year, and in order to balance the funds spending profile with the emerging pipeline of capital works, that has been reprofiled into 24/25. At Supplementary Estimates 2022-23 DCMSs supply estimate that was approved contained a Budget Exchange and a surrenderoffundingfor the YouthInvestmentFund, in order to ensure the spending profile reflected the latest delivery assessment at the time.","wholeLifeCost":341.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 22/23-Q4 is 341m. This is primarily due to the following factors. The 368m will provide youth facilities and services, including smallcommunity youth spaces, youth centres and activity centres in the most underprivilegedareas across the country.This investment will: Build/preserve youth facilities that are fit for purpose in areas of need Develop environmentally sustainable youth facilities Drive improvements in youth sector capability Improve access, participation and short-term wellbeing of young people Improve the evidence base for the youth sector","benefits":5318.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 5318m. The project's departmental-agree monetised benefits at 22/23-Q4 is 5318m.The project's departmental-agree monetised benefits at 22/23-Q4 is 5318m.The project's departmental-agree monetised benefits at 22/23-Q4 is 5318m. There are a number of monetised and non-monetised benefits. Monetised include: Attending youth services is associated with higher wellbeing for beneficiaries in the short-runActivities lead to intermediary outcomes (e.g. leadership, communication, aspiration) and therefore future life outcomes (e.g. education, employability, health)Intermediary outcomes also lead to impacts on wider society (e.g. reduced crime, lower public spending, higher tax revenue).Developing land or renovating existing physical infrastructure will lead to a higher land value. Non-monetised include - Increasing community infrastructure has links with increases in social capital and subsequent economic outcomes for communities. Renovating buildings lowers ongoing costs, and prevents further expenditure on repairs in the long run. Additional income will be generated in order to continue running the services.","themes":["Cost & funding","Delivery & schedule","Workforce & capability"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 is Amber. This is primarily due to the following factors. The programme has developed a pipeline for assessing bids and allocating funding. This will inform in year controls and help track the construction and budgets. The project's end-date at 22/23-Q4 is 2025-03-31.…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 22/23-Q4 is 2025-03-31. This is primarily due to the following factors. The programme is on track to deliver objectives by March 2025","narrativeClaimKind":null},{"id":"DCMS_0118_2223-Q1","year":2024,"name":"Youth Investment Fund","department":"DCMS","category":"Infrastructure and Construction","description":"We are investing over 300 million to provide youth facilities, including small community youth spaces, youth centres and activity centres in some of the most underprivileged areas across the country. This comprises 288 million capital funding (CDEL) and 80 million revenue funding (RDEL). Our spending objectives are to: - Build/preserve youth facilities that are fit for purpose - Develop environmentally sustainable youth facilities - Drive improvements in youth sector capability - Improve access, participation and short-term wellbeing of young people - Improve the evidence base for the youth sector","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. This is primarily due to YIF’s spend profile and timescales being too compressed to deliver all of its projects. However, to address this we are revising our Full Business Case (FBC) to seek a limited amount of funding beyond this date to support the forecast of a small number of projects extending into 2025/26. Quantifying this is work in progress.","startDate":"2022-04-01","endDate":"2025-03-31","scheduleNarrative":"The project's end-date at 23/24-Q4 is 2025-03-31. This is primarily due to the following factors. The fund's progress has diverged from the original spend profile which was agreed in 2022. This is due to a combination of factors, including that the original spend profile was misaligned with the usual profile of a large capital portfolio, a lack of shovel-ready projects available to bid into the fund at the onset, delays in the planning system, the capacity and capability of some grantees to manage their projects, and the amount of legal diligence needed to assure the projects before construction could commence. The latest FBC applies adjustments to forecasts to learn from the previous experience of managing the fund, allow for risk and inherent optimism, and provide an appropriate level of contingency. This, together with an enhanced level of centrally-provided professional project management support to grantees, and the fact that the vast majority of projects will shortly have started on site, gives significantly greater confidence in the revised timescales.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"The construction programme is driven by grantees applying for and managing the funding. The budget is under constant review to ensure funding is available in the fiscal year it is required.","wholeLifeCost":310.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 decreased from 341m. to 310m. This is primarily due to the following factors: The whole life costs are under constant review. With up to 300 individual projects the costs are demand led and monitored by the intermediary grant maker.","benefits":4094.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agreed monetised benefits at 23/24-Q4 decreased from 5318m. to 4094m. The decrease in monetised benefits is due to the programme being able to view a project pipeline of real projects and a £30m net reduction in budget. Prior to this the estimations were based on hypothetical projects and a higher level of investment.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Workforce & capability"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. This is primarily due to YIF’s spend profile and timescales being too compressed to deliver all of its projects. However, to address this we are revising our Full Business Case (FBC) to seek a limited amount of…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 23/24-Q4 is 2025-03-31. This is primarily due to the following factors. The fund's progress has diverged from the original spend profile which was agreed in 2022. This is due to a combination of factors, including that the original spend profile was misaligned with the usual profile of a large capital portfolio, a lack of shovel-ready projects available to bid into the fund at the onset, delays in the planning system, the capacity and capability of some grantees to manage their projects, and the amount of legal diligence needed to assure the projects before construction could commence. The latest FBC applies adjustments to forecasts to learn from the previous experience of managing the fund, allow for risk and inherent optimism, and provide an appropriate level of contingency. This, together with an enhanced level of centrally-provided professional project management support to grantees, and the fact that the vast majority of projects will shortly have started on site, gives significantly greater confidence in the revised timescales.","narrativeClaimKind":null},{"id":"DCMS_0118_2223-Q1","year":2025,"name":"Youth Investment Fund","department":"DCMS","category":"Infrastructure and Construction","description":"The Youth Investment Fund’s (YIF) objective is to create, expand and improve up to 300 local youth facilities and their services, in order to drive positive outcomes for young people, including improved mental and physical wellbeing, and skills for life and work. YIF is a commitment to young people to transform the out-of-school youth sector. It will provide truly innovative youth facilities in priority areas, and early-stage/seed resource funding to underpin them, enabling more positive activities that deliver improved outcomes and opportunities for young people.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ some projects not being complete by the 31/03/25. This has meant that the programme has been extended to 31/03/2026 and therefore the projects within our delivery pipeline are still on-going.","startDate":"2022-04-01","endDate":"2026-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2025 to 31/03/2026. This is primarily due to the following factors‚ some projects not completing by 31/03/2025 due to delays as a result of protracted legal due diligence activities, time lost on construction sites as a result of poor weather/ground conditions and over optimism on the behalf of grantees and the sub-contractors with their scheduling.","fyBaseline":234.62,"fyForecast":225.71,"fyVariance":3.8,"varianceNarrative":"The budget variance is less than or equal to 5%. The in-year variance for 2024/25 was 16.6% (£175m actual spend against post-Supps 2023 budget of £210m). Budget was re-profiled into 2025/26 through the updated FBC with no significant impact on the overall budget. We remain within the FBC envelope","wholeLifeCost":310.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 310. This is primarily due to the following factors‚ in-year variance relating to slippage of some projects rather than genuine underspends. The projects will be completed to the same overall budget, but in 2025/26 rather than 2024/25 with the programme's lifecycle extended accordingly.","benefits":4094.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) decreased from 4094 to 2434.5. This is primarily due to the following factors‚ a change in the benefits model, which decreased the measurement period from 30 years to 20 years. Next quarter's data will include an updated figure to include the recently included MMC portfolio.","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ some projects not being complete by the 31/03/25. This has meant that the programme has been extended to 31/03/2026 and therefore the projects within our delivery…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2025 to 31/03/2026. This is primarily due to the following factors‚ some projects not completing by 31/03/2025 due to delays as a result of protracted legal due diligence activities, time lost on construction sites as a result of poor weather/ground conditions and over optimism on the behalf of grantees and the sub-contractors with their scheduling.","narrativeClaimKind":null},{"id":"DCMS_0118_2223-Q1","year":2026,"name":"Youth Investment Fund","department":"DCMS","category":"Infrastructure and Construction","description":"Over £300 million to create, expand and improve youth facilities and services in England by September 2026. The Youth Investment Fund’s (YIF) objective is to create, expand and improve up to 300 local youth facilities and their services, in order to drive positive outcomes for young people, including improved mental and physical wellbeing, and skills for life and work. YIF is a commitment to young people to transform the out-of-school youth sector. It will provide truly innovative youth facilities in priority areas, and early-stage/seed resource funding to underpin them, enabling more positive activities that deliver improved outcomes for young people.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 the programme improved it's delivery confidence rating to Amber. This is primarily due to the following factors‚ the majority of projects within the programme have now been completed with the remainder due to be complete within the first half of the next financial year. This means we can be more confident that the last part of the year we are likely to deliver the programme's expected benefits.","startDate":"2022-04-01","endDate":null,"scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 increased from last year's published end-date to this year's published end-date, 31 March 2028. This is primarily due to the inclusion of the MMC workstream in the programme, end dates of which have slipped into 2026/27 FY; and the delivery of our benefits realisation programme then supports projects being financially viable one year after opening.","fyBaseline":47.84,"fyForecast":45.11,"fyVariance":5.71,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to some projects slipping into 26/27 with all remaining projects due to be completed in the first half of the next financial year.","wholeLifeCost":360.15,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) increased from last year's WLC 316.94m to 354.58m. This is primarily due to the actual costs for 25/26 and forecasted costs for 26/27 being accounted. Please note figures referenced in the narratives were entered as nominal and the system automatically converts them to Real Terms.","benefits":2437.88,"benefitsNarrative":"Compared to financial year 24/25 Q4 the projects departmentally agreed Benefits 2,455.29m has increased to this years Benefits total £2,922.600m. This is due to a programme model change, which decreased from 30 years to 20 years. This is reflective of the current re-modelling, with the FBC now inclusive of the MMC figure which provides a justification to this change.","themes":["Cost & funding","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 the programme improved it's delivery confidence rating to Amber. This is primarily due to the following factors‚ the majority of projects within the programme have now been completed with the remainder due to be complete within the first half of the…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 increased from last year's published end-date to this year's published end-date, 31 March 2028. This is primarily due to the inclusion of the MMC workstream in the programme, end dates of which have slipped into 2026/27 FY; and the delivery of our benefits realisation programme then supports projects being financially viable one year after opening.","narrativeClaimKind":null}],"previous":{"id":"DCMS_0118_2223-Q1","year":2025,"name":"Youth Investment Fund","department":"DCMS","category":"Infrastructure and Construction","description":"The Youth Investment Fund’s (YIF) objective is to create, expand and improve up to 300 local youth facilities and their services, in order to drive positive outcomes for young people, including improved mental and physical wellbeing, and skills for life and work. YIF is a commitment to young people to transform the out-of-school youth sector. It will provide truly innovative youth facilities in priority areas, and early-stage/seed resource funding to underpin them, enabling more positive activities that deliver improved outcomes and opportunities for young people.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ some projects not being complete by the 31/03/25. This has meant that the programme has been extended to 31/03/2026 and therefore the projects within our delivery pipeline are still on-going.","startDate":"2022-04-01","endDate":"2026-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2025 to 31/03/2026. This is primarily due to the following factors‚ some projects not completing by 31/03/2025 due to delays as a result of protracted legal due diligence activities, time lost on construction sites as a result of poor weather/ground conditions and over optimism on the behalf of grantees and the sub-contractors with their scheduling.","fyBaseline":234.62,"fyForecast":225.71,"fyVariance":3.8,"varianceNarrative":"The budget variance is less than or equal to 5%. The in-year variance for 2024/25 was 16.6% (£175m actual spend against post-Supps 2023 budget of £210m). Budget was re-profiled into 2025/26 through the updated FBC with no significant impact on the overall budget. We remain within the FBC envelope","wholeLifeCost":310.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 310. This is primarily due to the following factors‚ in-year variance relating to slippage of some projects rather than genuine underspends. The projects will be completed to the same overall budget, but in 2025/26 rather than 2024/25 with the programme's lifecycle extended accordingly.","benefits":4094.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) decreased from 4094 to 2434.5. This is primarily due to the following factors‚ a change in the benefits model, which decreased the measurement period from 30 years to 20 years. Next quarter's data will include an updated figure to include the recently included MMC portfolio.","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ some projects not being complete by the 31/03/25. This has meant that the programme has been extended to 31/03/2026 and therefore the projects within our delivery…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2025 to 31/03/2026. This is primarily due to the following factors‚ some projects not completing by 31/03/2025 due to delays as a result of protracted legal due diligence activities, time lost on construction sites as a result of poor weather/ground conditions and over optimism on the behalf of grantees and the sub-contractors with their scheduling.","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":null,"attentionScore":20,"attentionReasons":["Current published delivery confidence is Amber","In-year forecast variance is +5.7%"]},{"id":"MOJ_0050_2021-Q1","year":2026,"name":"10k Additional Prison Places - New Build","department":"MOJ","category":"Infrastructure and Construction","description":"The New Build programme supports our 20,000 additional prison places commitment; its scope is to build four new prisons","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA Delivery Confidence Assessment rating at 25/26 Q4 remains at Amber. This is primarily due to the following factors, HMP Millsike delivered to time and budget. HMP Welland Oaks is in main construction and delivery is on track. The remaining two sites have not yet entered main works contract and carry delivery risks that are being actively managed","startDate":"2020-03-02","endDate":"2032-05-31","scheduleNarrative":"The project's end date remains scheduled to finish on 31/05/32. The project remains on track to deliver against the baseline schedule.","fyBaseline":388.91,"fyForecast":398.17,"fyVariance":2.38,"varianceNarrative":"The budget variance is equal to or less than 5%.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"This programme currently reports no monetised benefits. Due to the projected increasing prisons population, this programme focusses on increasing capacity and there are no monetised benefits to be claimed. The programme's other benefits are defined in the current baseline as: construction benefits and outcomes (capacity, modern methods of construction and sustainability); to enable an improvement in prisoner rehabilitation outcomes; and, during its construction, deliver local community benefits.​","themes":["Delivery & schedule","Cost & funding","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA Delivery Confidence Assessment rating at 25/26 Q4 remains at Amber. This is primarily due to the following factors, HMP Millsike delivered to time and budget. HMP Welland Oaks is in main construction and delivery is on track. The remaining two sites have not yet entered main works contract and carry delivery…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end date remains scheduled to finish on 31/05/32. The project remains on track to deliver against the baseline schedule.","narrativeClaimKind":null,"history":[{"id":"MOJ_0050_2021-Q1","year":2021,"name":"10,000 Additional Prison Places","department":"MOJ","category":"Infrastructure and Construction","description":"The prison population is forecast to rise significantly during the 2020s and the department is bringing forward new prison places to accommodate new offenders. In August 2019 the Prime Minister announced �2.5bn of funding to deliver 10,000 additional prison places through the building of new prisons and expanding the prison estate. The New Prisons projects form part of the 10,000 Additional Prison Places Programme and its scope is to build four new prisons (of up to c.1,700 places each).","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber/red.This is primarily due to the following factors: The project is making good progress; however, it is working to an ambitious timeline and successful delivery is dependent on several factors that are outside of the project's direct control. The need to secure planning permission for three new sites is the principal risk impacting delivery confidence. Engagement and consultation with local communities is either planned or underway to help build support for planned development and delivery confidence is expected to improve in the next period.","startDate":"2020-03-02","endDate":"2027-03-30","scheduleNarrative":"The project end-date is 30 March 2027. This is primarily due to the following factors: The Project is on track to deliver within committed timeframe, although significant risks remain such as the duration of the planning process. The dates were estimated based on early assumptions and will be refined further in the full business case.","fyBaseline":8.68,"fyForecast":11.06,"fyVariance":27.0,"varianceNarrative":"The budget variance exceeds 5%. The increase in expenditure in-year reflects an acceleration of planned activity. The project is forecast to remain within its overall whole life costs.","wholeLifeCost":25596.47,"costNarrative":"The projects Baseline Whole Life Cost is �25596.47m. This is primarily due to the following factors: The baseline is an estimate of the cost of building and then operating and maintaining the four prisons over their estimated 60-year lives. This baseline estimate is based on the project's Outline Business Case and will be updated pending approval of a Full Business Case.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber/red.This is primarily due to the following factors: The project is making good progress; however, it is working to an ambitious timeline and successful delivery is dependent on several factors that are outside of the project's direct control. The need to secure planning…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project end-date is 30 March 2027. This is primarily due to the following factors: The Project is on track to deliver within committed timeframe, although significant risks remain such as the duration of the planning process. The dates were estimated based on early assumptions and will be refined further in the full business case.","narrativeClaimKind":null},{"id":"MOJ_0050_2021-Q1","year":2022,"name":"10,000 Additional Prison Places","department":"MOJ","category":"Infrastructure and Construction","description":"The prison population is forecast to rise significantly during the 2020s, and projected demand will soon outstrip supply. There is therefore a need to increase prison capacity. In August 2019, the Prime Minister announced that £2.5bn would be made available to deliver 10,000 additional prison places through the building of new prisons and expanding the prison estate. This has since been amended to £3.8bn, the New Prisons projects now form part of the 20,000 Additional Prison Places commitment; its scope is to build four new prisons (of up to 1,680 places each).","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 decreased from Amber/red to Amber This is primarily due to contingency planning that should enable the project to deliver within the baseline cost and schedule, except for one site. The project has had a number of risks recently realised including planning refusal at two sites. An appeal has been submitted on the first of these refusals and the project have been rapidly developing a contingency site in anticipation of the second refusal.","startDate":"2020-03-02","endDate":"2027-03-30","scheduleNarrative":"Compared to 20/21 Q4, the project end date has remained static.","fyBaseline":50.34,"fyForecast":48.91,"fyVariance":-3.0,"varianceNarrative":"The in year variance is below or equal to 5% so no narrative is required.","wholeLifeCost":32614.0,"costNarrative":"Compared to2021-Q4, the projects Baseline Whole Life Cost increased from 25596.47 (£m) to 32614.13 (£m). This is primarily due to the following factors: An increase in operational costs (which have now been profiled over a sixty year period) being revised in the Full Business Case.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 decreased from Amber/red to Amber This is primarily due to contingency planning that should enable the project to deliver within the baseline cost and schedule, except for one site. The project has had a number of risks recently…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to 20/21 Q4, the project end date has remained static.","narrativeClaimKind":null},{"id":"MOJ_0050_2021-Q1","year":2023,"name":"10k Additional Prison Places - New Build","department":"MOJ","category":"Infrastructure and Construction","description":"The New Build project supports our 20,000 additional prison places commitment; its scope is to build four new prisons.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. Compared to21/22 Q4, theproject'sDelivery Confidence Assessment rating remained Amber.The Amber assessment is due to planning permission refusals atthree of the new prison sites which are subject to planning appeals.There has been positive progress building the third of our new prisons (Full Sutton).(The main works contract was executed on 21 July 2022 following which construction commenced in August 2022 and delivery is on track).","startDate":"2020-03-02","endDate":null,"scheduleNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","fyBaseline":230.27,"fyForecast":221.0,"fyVariance":-4.0,"varianceNarrative":"Variance less than 5% so no narrative required","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This project currently reports no monetised benefits. This programme's primary benefit relates to increasing capacity due to the projected rise in prison population as opposed to monetised benefits.The programme's other benefits are defined in the current baseline as: construction benefits and outcomes (capacity, modern methods of construction and sustainability); to enable an improvement in prisoner rehabilitation outcomes; and, during its construction, deliver local community benefits.","themes":["Commercial & supply chain","Delivery & schedule","Cost & funding"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. Compared to21/22 Q4, theproject'sDelivery Confidence Assessment rating remained Amber.The Amber assessment is due to planning permission refusals atthree of the new…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","narrativeClaimKind":null},{"id":"MOJ_0050_2021-Q1","year":2024,"name":"10k Additional Prison Places - New Build","department":"MOJ","category":"Infrastructure and Construction","description":"The New Build project supports our 20,000 additional prison places commitment; its scope is to build four new prisons.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. One of the four new prisons, HMP Millsike is on track to deliver as expected. Outline planning permission has been received for two sites and the final site remains to secure planning permission.","startDate":"2020-03-02","endDate":null,"scheduleNarrative":"Exempt under Section 22 of the Freedom of Information Act 2000 (Information intended for future publication)","fyBaseline":805.3,"fyForecast":309.86,"fyVariance":-62.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The underspend is due to delays in receiving planning permission at three sites.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":0.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 0m. This project currently reports no monetised benefits. This programme's primary benefit relates to increasing capacity due to the projected rise in prison population as opposed to monetised benefits.The programme's other benefits are defined in the current baseline as: construction benefits and outcomes (capacity, modern methods of construction and sustainability); to enable an improvement in prisoner rehabilitation outcomes; and, during its construction, deliver local community benefits.","themes":["Commercial & supply chain","Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. One of the four new prisons, HMP Millsike is on track to deliver as expected. Outline planning permission has been received for two sites and the final site remains…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 22 of the Freedom of Information Act 2000 (Information intended for future publication)","narrativeClaimKind":null},{"id":"MOJ_0050_2021-Q1","year":2025,"name":"10k Additional Prison Places - New Build","department":"MoJ","category":"Infrastructure and Construction","description":"The New Build project supports our 20,000 additional prison places commitment; its scope is to build four new prisons.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ One of the four new prisons, HMP Millsike is on track to deliver on schedule. Either Full or Outline planning permission has been secured for the other sites, however timeline risks remain.","startDate":"2020-03-02","endDate":"2032-05-31","scheduleNarrative":"The project's end-date at 24/25-Q4 is scheduled to be 31/05/2032. This is primarily due to the following factors‚ Planning permission delays at three sites.","fyBaseline":840.85,"fyForecast":182.8,"fyVariance":78.26,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The underspend is due to delays in receiving planning permission at three sites.","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ This project currently reports no monetised benefits. Due to the projected increasing prisons population, this project focusses on increasing capacity and there are no monetised benefits to be claimed. The programme's other benefits are defined in the current baseline as: construction benefits and outcomes (capacity, modern methods of construction and sustainability); to enable an improvement in prisoner rehabilitation outcomes; and, during its construction, deliver local community benefits.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ One of the four new prisons, HMP Millsike is on track to deliver on schedule. Either Full or Outline planning permission has been secured for the other sites, however…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 24/25-Q4 is scheduled to be 31/05/2032. This is primarily due to the following factors‚ Planning permission delays at three sites.","narrativeClaimKind":null},{"id":"MOJ_0050_2021-Q1","year":2026,"name":"10k Additional Prison Places - New Build","department":"MOJ","category":"Infrastructure and Construction","description":"The New Build programme supports our 20,000 additional prison places commitment; its scope is to build four new prisons","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA Delivery Confidence Assessment rating at 25/26 Q4 remains at Amber. This is primarily due to the following factors, HMP Millsike delivered to time and budget. HMP Welland Oaks is in main construction and delivery is on track. The remaining two sites have not yet entered main works contract and carry delivery risks that are being actively managed","startDate":"2020-03-02","endDate":"2032-05-31","scheduleNarrative":"The project's end date remains scheduled to finish on 31/05/32. The project remains on track to deliver against the baseline schedule.","fyBaseline":388.91,"fyForecast":398.17,"fyVariance":2.38,"varianceNarrative":"The budget variance is equal to or less than 5%.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"This programme currently reports no monetised benefits. Due to the projected increasing prisons population, this programme focusses on increasing capacity and there are no monetised benefits to be claimed. The programme's other benefits are defined in the current baseline as: construction benefits and outcomes (capacity, modern methods of construction and sustainability); to enable an improvement in prisoner rehabilitation outcomes; and, during its construction, deliver local community benefits.​","themes":["Delivery & schedule","Cost & funding","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA Delivery Confidence Assessment rating at 25/26 Q4 remains at Amber. This is primarily due to the following factors, HMP Millsike delivered to time and budget. HMP Welland Oaks is in main construction and delivery is on track. The remaining two sites have not yet entered main works contract and carry delivery…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end date remains scheduled to finish on 31/05/32. The project remains on track to deliver against the baseline schedule.","narrativeClaimKind":null}],"previous":{"id":"MOJ_0050_2021-Q1","year":2025,"name":"10k Additional Prison Places - New Build","department":"MoJ","category":"Infrastructure and Construction","description":"The New Build project supports our 20,000 additional prison places commitment; its scope is to build four new prisons.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ One of the four new prisons, HMP Millsike is on track to deliver on schedule. Either Full or Outline planning permission has been secured for the other sites, however timeline risks remain.","startDate":"2020-03-02","endDate":"2032-05-31","scheduleNarrative":"The project's end-date at 24/25-Q4 is scheduled to be 31/05/2032. This is primarily due to the following factors‚ Planning permission delays at three sites.","fyBaseline":840.85,"fyForecast":182.8,"fyVariance":78.26,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The underspend is due to delays in receiving planning permission at three sites.","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ This project currently reports no monetised benefits. Due to the projected increasing prisons population, this project focusses on increasing capacity and there are no monetised benefits to be claimed. The programme's other benefits are defined in the current baseline as: construction benefits and outcomes (capacity, modern methods of construction and sustainability); to enable an improvement in prisoner rehabilitation outcomes; and, during its construction, deliver local community benefits.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ One of the four new prisons, HMP Millsike is on track to deliver on schedule. Either Full or Outline planning permission has been secured for the other sites, however…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 24/25-Q4 is scheduled to be 31/05/2032. This is primarily due to the following factors‚ Planning permission delays at three sites.","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":0,"attentionScore":18,"attentionReasons":["Current published delivery confidence is Amber"]},{"id":"DFT_0047_2021-Q3","year":2026,"name":"A66 Northern Trans-Pennine","department":"DFT","category":"Infrastructure and Construction","description":"Upgrading the remaining six single carriageway sections of the A66 between the A1(M) at Scotch Corner and the M6 at Penrith, creating a continuous dual carriageway across the Pennines, including key junction upgrades","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber.","startDate":"2017-07-05","endDate":"2026-11-01","scheduleNarrative":"Exempt under Section 22 - Information intended for future publication","fyBaseline":81.34,"fyForecast":81.34,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":467.23,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 remained unchanged. Please note that a known technical issue within NISTA means the benefits reported here differ from those submitted to NISTA.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. Exempt under Section 22 - Information intended for future publication","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 22 - Information intended for future publication","narrativeClaimKind":null,"history":[{"id":"DFT_0047_2021-Q3","year":2021,"name":"A66 Northern Trans-Pennine","department":"DFT","category":"Infrastructure and Construction","description":"Dualling of the remaining single-carriageway sections on the A66 between M6 J40 Penrith and A1M Scotch Corner, creating a continuous dual carriageway across the Pennines.","ipaDca":"Green","sroDca":null,"deliveryConfidence":"Green","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Green.This is primarily due to the following factors: The programme and costs have been re-baselined in line with the accelerated timetable approved by HM Treasury. Construction is now scheduled to start in 2024 and take 5 years, with the road therefore opening to traffic in 2029. In March 2021 HM Treasury approved the full accelerated Development Phase budget. The project is currently well within all the elements of the set baseline. Note: There are 10 requirements to achieve acceleration, including a progressive assurance approach which has been discussed and agreed with IPA for Outline Business Case (Project Assurance Review) and Full Business Case (Independent Assurance Review Gate 3)","startDate":"2017-07-05","endDate":"2030-03-31","scheduleNarrative":"The project end-date is 31 March 2030. This is primarily due to the following factors: The schedule was re-baselined to achieve the accelerated position to commence construction work in 2024 with a construction period of 5 years, as per agreement from HM Treasury. All milestones are currently forecast to be met","fyBaseline":13.72,"fyForecast":13.72,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":1289.4,"costNarrative":"The projects Baseline Whole Life Cost is �1289.40m. This is primarily due to the following factors: The whole life cost is based on the latest funding position a for the 5 year construction length with a start of works in 2024. All figures are based on 2019 base prices undiscounted but including inflation, portfolio risk and non-recoverable VAT.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Governance & assurance","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Green.This is primarily due to the following factors: The programme and costs have been re-baselined in line with the accelerated timetable approved by HM Treasury. Construction is now scheduled to start in 2024 and take 5 years, with the road therefore opening to traffic in…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project end-date is 31 March 2030. This is primarily due to the following factors: The schedule was re-baselined to achieve the accelerated position to commence construction work in 2024 with a construction period of 5 years, as per agreement from HM Treasury. All milestones are currently forecast to be met","narrativeClaimKind":null},{"id":"DFT_0047_2021-Q3","year":2022,"name":"A66 Northern Trans-Pennine","department":"DFT","category":"Infrastructure and Construction","description":"Dualling of the remaining single-carriageway sections on the A66 between M6 J40 Penrith and A1M Scotch Corner, creating a continuous dual carriageway across the Pennines.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 increased from Green to Amber. Compared to financial year 20/21-Q4, National Highways project team rating at 21/22-Q4 has moved from Green to Amber, which aligns to IPA's assessment. The project is moving at pace and has undertaken extensive statutory consultation. There is general support for the scheme and the overall sentiment is positive at a local, regional and national level. The Decision Consent Order (DCO) submission is in its final stages of preparation; it is undergoing assurance through Legal and DCO Readiness Reviews, with actions identified being progressed to make it robust and ready for acceptance. Despite a DCO submission and scheme that adheres to policy, and responds to stakeholder feedback, there is a risk of challenge to the DCO.","startDate":"2017-07-05","endDate":"2030-03-31","scheduleNarrative":"Compared to 2021-Q4, your project end-date remained scheduled to finish on 31 MAR 2030 . This is primarily due to the following factors: The committed milestones of Start of Work (SoW) (Q4 23/24) and forecast Open for Traffic (OfT) (Q4 28/29) are still on target. Statutory Consultation milestone has been met on the 24th of September 21 and ended 6th November 2021. Non-statutory targeted engagement has been undertaken in February and March 2022 and DCO is on target for submission in May 2022. The Amber assessment accounts for the fact that some float has been used by moving the DCO submission from February 22 to May 22 (although SoW and OfT dates remain the same). However, the risk of challenge or non-acceptance to DCO will impact on programme and put the committed milestones of SoW and OfT at risk.","fyBaseline":27.17,"fyForecast":42.3,"fyVariance":56.0,"varianceNarrative":"Opportunity has been taken to bring forward work from future Project Control Framework (PCF) stages to de-risk the accelerated Start of Work date and inform the preliminary design taken to DCO. This enable a more robust design to be presented. This work includes:- - More detailed and extensive archaeological surveys - More detailed and extensive ground investigation work - Full topographically survey - Engagement with the Design and Build Contractors (DIPs) via early orders to set strategies and enable detailed planning of the construction phase. Work has also been undertaken to ensure an Affordable, Buildable, Consentable and Defendable design is presented at DCO. This has involved some re-optioneering work to mitigate some of the emerging risks. Lands spend has been brought forward as more blight claims have been processed in year than originally anticipated and as a result of the work noted above there has been additional spend associated with compensation payments for land access for surveys.","wholeLifeCost":1140.0,"costNarrative":"Compared to 2021-Q4, the projects Baseline Whole Life Cost decreased from 1289.40 (£m) to 1140.22 (£m). This is primarily due to the following factors: The whole life cost (£1,140m) is based on the stage 2 assured estimate which is yet to reflect the impact of statutory consultation. This value is below the value agreed at the time of acceleration £1,289m (December 2020) and is informed by a more mature design position that reflects the refreshed Outline business Case (OBC) approved in Summer 21. Given that the project is still in the process of finalising design following statutory consultation, a cost trigger point based on £1,140m+ 10% tolerance has been noted at IPDC in Summer 2021, at £1,254m. A final stage 3 estimate is due to inform the 22/23 Q1 report.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Scope & requirements","Approvals & decisions","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 increased from Green to Amber. Compared to financial year 20/21-Q4, National Highways project team rating at 21/22-Q4 has moved from Green to Amber, which aligns to IPA's assessment. The project is moving at pace and has undertaken…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to 2021-Q4, your project end-date remained scheduled to finish on 31 MAR 2030 . This is primarily due to the following factors: The committed milestones of Start of Work (SoW) (Q4 23/24) and forecast Open for Traffic (OfT) (Q4 28/29) are still on target. Statutory Consultation milestone has been met on the 24th of September 21 and ended 6th November 2021. Non-statutory targeted engagement has been undertaken in February and March 2022 and DCO is on target for submission in May 2022. The Amber assessment accounts for the fact that some float has been used by moving the DCO submission from February 22 to May 22 (although SoW and OfT dates remain the same). However, the risk of challenge or non-acceptance to DCO will impact on programme and put the committed milestones of SoW and OfT at risk.","narrativeClaimKind":null},{"id":"DFT_0047_2021-Q3","year":2023,"name":"A66 Northern Trans-Pennine","department":"DFT","category":"Infrastructure and Construction","description":"Dualling of the remaining single-carriageway sections on the A66 between M6 J40 Penrith and A1M Scotch Corner, creating a continuous dual carriageway across the Pennines.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber (SRO rating). This is primarily due to the following factors. An Action Plan has been put in place to address the five actions from the last Assurance Review, and progress is monitored on a monthly basis. The next the IPA Assurance Review (scheduled for July 2023) will formally review progress against the Action Plan.","startDate":"2017-07-05","endDate":"2030-03-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2030-03-31. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2030-03-31. This is primarily due to the following factors. The committed milestones of Start of Work in Q4 23/24 and Open for Traffic in Road Investment Period 3 are still on track. Over the course of Financial Year 22/23, the project has achieved a number of important milestones, including Development Consent Order Submission (June 2022), National Highways Project Controls Framework Stage 3 completion (June 2022), contract award with the Delivery Integration Partners (October 2022), and the commencement of the Development Consent Order Examination in November 2022.","fyBaseline":68.8,"fyForecast":66.76,"fyVariance":-3.0,"varianceNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":692.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 692m. The baseline monetised benefits reflect the June 2022 DfT Investment Committee (IPDC) approved position. A value for money remediation plan is being implemented. This information will be presented in the Full Business Case.","themes":["Delivery & schedule","Governance & assurance","Commercial & supply chain","Cost & funding"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber (SRO rating). This is primarily due to the following factors. An Action Plan has been put in place to address the five actions from the last Assurance Review, and progress is monitored on a monthly basis. The next the IPA Assurance Review (scheduled…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2030-03-31. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2030-03-31. This is primarily due to the following factors. The committed milestones of Start of Work in Q4 23/24 and Open for Traffic in Road Investment Period 3 are still on track. Over the course of Financial Year 22/23, the project has achieved a number of important milestones, including Development Consent Order Submission (June 2022), National Highways Project Controls Framework Stage 3 completion (June 2022), contract award with the Delivery Integration Partners (October 2022), and the commencement of the Development Consent Order Examination in November 2022.","narrativeClaimKind":null},{"id":"DFT_0047_2021-Q3","year":2024,"name":"A66 Northern Trans-Pennine","department":"DFT","category":"Infrastructure and Construction","description":"Upgrading the remaining six single carriageway sections of the A66 between the A1(M) at Scotch Corner and the M6 at Penrith, creating a continuous dual carriageway across the Pennines, including key junction upgrades","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. Actions arising from the last Assurance Review have been completed. The next IPA Assurance Review will be to support the Full Business Case ahead of Start of Works and will formally review progress against the actions.","startDate":"2017-07-05","endDate":"2030-03-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2030-03-31. This is primarily due to the following factors. Over the course of Financial Year 23/24, the project has achieved the important milestone of receiving Secretary of State approval to the Development Consent Order (DCO) on the 7 March 2024.","fyBaseline":112.47,"fyForecast":112.47,"fyVariance":0.0,"varianceNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":692.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 692m. The project's departmental-agree monetised benefits at 22/23-Q4 is 692m. The baseline monetised benefits reflect the June 2022 DfT Investment Committee (IPDC) approved position. The Full Business Case will include confirmation of the project's value for money.","themes":["Governance & assurance","Commercial & supply chain","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. Actions arising from the last Assurance Review have been completed. The next IPA Assurance Review will be to support the Full Business Case ahead of Start of Works and will…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2030-03-31. This is primarily due to the following factors. Over the course of Financial Year 23/24, the project has achieved the important milestone of receiving Secretary of State approval to the Development Consent Order (DCO) on the 7 March 2024.","narrativeClaimKind":null},{"id":"DFT_0047_2021-Q3","year":2025,"name":"A66","department":"DfT","category":"Infrastructure and Construction","description":"Upgrading the remaining six single carriageway sections of the A66 between the A1(M) at Scotch Corner and the M6 at Penrith, creating a continuous dual carriageway across the Pennines, including key junction upgrades.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. Actions arising from the last Assurance Review have been completed. The next NISTA Assurance Review will be to support the Full Business Case ahead of Start of Works and will formally review progress against the actions.","startDate":"2017-07-05","endDate":null,"scheduleNarrative":"Project development continued, with enabling works on site. Delivery subject to 2025 Spending Review.","fyBaseline":85.5,"fyForecast":85.5,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":793.59,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 692 to 793. Quantified benefits for the project have been updated to reflect latest guidance and were reported to IPDC in January 2024.","themes":["Governance & assurance","Delivery & schedule","Approvals & decisions","Cost & funding"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. Actions arising from the last Assurance Review have been completed. The next NISTA Assurance Review will be to support the Full Business Case ahead of Start of Works and will formally review progress against the…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Project development continued, with enabling works on site. Delivery subject to 2025 Spending Review.","narrativeClaimKind":null},{"id":"DFT_0047_2021-Q3","year":2026,"name":"A66 Northern Trans-Pennine","department":"DFT","category":"Infrastructure and Construction","description":"Upgrading the remaining six single carriageway sections of the A66 between the A1(M) at Scotch Corner and the M6 at Penrith, creating a continuous dual carriageway across the Pennines, including key junction upgrades","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber.","startDate":"2017-07-05","endDate":"2026-11-01","scheduleNarrative":"Exempt under Section 22 - Information intended for future publication","fyBaseline":81.34,"fyForecast":81.34,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":467.23,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 remained unchanged. Please note that a known technical issue within NISTA means the benefits reported here differ from those submitted to NISTA.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. Exempt under Section 22 - Information intended for future publication","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 22 - Information intended for future publication","narrativeClaimKind":null}],"previous":{"id":"DFT_0047_2021-Q3","year":2025,"name":"A66","department":"DfT","category":"Infrastructure and Construction","description":"Upgrading the remaining six single carriageway sections of the A66 between the A1(M) at Scotch Corner and the M6 at Penrith, creating a continuous dual carriageway across the Pennines, including key junction upgrades.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. Actions arising from the last Assurance Review have been completed. The next NISTA Assurance Review will be to support the Full Business Case ahead of Start of Works and will formally review progress against the actions.","startDate":"2017-07-05","endDate":null,"scheduleNarrative":"Project development continued, with enabling works on site. Delivery subject to 2025 Spending Review.","fyBaseline":85.5,"fyForecast":85.5,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":793.59,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 692 to 793. Quantified benefits for the project have been updated to reflect latest guidance and were reported to IPDC in January 2024.","themes":["Governance & assurance","Delivery & schedule","Approvals & decisions","Cost & funding"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. Actions arising from the last Assurance Review have been completed. The next NISTA Assurance Review will be to support the Full Business Case ahead of Start of Works and will formally review progress against the…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Project development continued, with enabling works on site. Delivery subject to 2025 Spending Review.","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":null,"attentionScore":18,"attentionReasons":["Current published delivery confidence is Amber"]},{"id":"DLUHC_0138_2223-Q1","year":2026,"name":"Affordable Homes Programme (AHP)","department":"MHCLG","category":"Infrastructure and Construction","description":"The Affordable Homes Programme (AHP) is the grant funding vehicle used by Government for the delivery of social and affordable housing in England. It allocates grant funding to Registered Providers of social housing to help support the capital costs of developing affordable housing for rent or sale. In 2023, revised targets were agreed with the delivery agencies which re-baselined the Programme to a new delivery range of 110,000-130,000; this was announced in 2024.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. Following the data received from agencies, we have now reached at least the lower end of the overall target range of 110,000-130,000 homes. We expect a further c.10,000 housing starts with deadline extensions to follow in 26/27. While the GLA did not meet its 2021–26 target, it remains confident that delivery will increase under the extended timetable. This confidence is supported by its 2025/26 performance, which saw the highest number of starts delivered in the programme to date.","startDate":"2021-01-03","endDate":"2030-03-31","scheduleNarrative":"There has been no change to the schedule for the programme.","fyBaseline":3168.01,"fyForecast":3168.01,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":12230.5,"costNarrative":"The WLC remains the same. There has been a minor variance in year by year budgets following business planning outcomes in the department. We intend for the programme to spend to its full budget.","benefits":16559.67,"benefitsNarrative":"These benefits consist of increased housing supply from the construction of new social and affordable units (measured by Land Value Uplift), distributional benefits and wider fiscal impacts.","themes":["Delivery & schedule","Cost & funding","Governance & assurance","Technical & integration"],"evidenceExcerpt":"The SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. Following the data received from agencies, we have now reached at least the lower end of the overall target range of 110,000-130,000 homes. We expect a further c.10,000 housing starts with deadline extensions to follow in 26/27. While the GLA did not meet its 2021–26 target,…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"There has been no change to the schedule for the programme.","narrativeClaimKind":null,"history":[{"id":"DLUHC_0138_2223-Q1","year":2023,"name":"Affordable Homes Programme","department":"DLUHC","category":"Infrastructure and Construction","description":"The Affordable Homes Programme (AHP) is one of the primary vehicles used by Government for the delivery of affordable housing in England. It allocates grant funding to Local Authorities (LAs) and Housing Associations (HAs) to help support the capital costs of developing affordable housing for rent or sale.The AHP operates with a budget of 11.5bn, delivering tens of thousands of homes across England for both rent and sale.Delivery of the programme is delegated to our delivery partners, Homes England (HE) and the Greater London Authority (GLA). Our delivery partners have full delegated responsibility to make spending and allocation decisions in line with their targets, agreed assessment criteria, and within predetermined delegation limits.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 is Amber. This is primarily due to the following factors. The programmes delivery confidence is currently rated as amber. This reflects the risk that the programme will be unable to deliver the commitments in the original business case because of changes in the wider economy (primarily high inflation), and pressures on the finances of social housing providers. In Quarter 4, the programme gained agreement, through a revised business case, to re-baseline the programmes delivery, spend profiles and final targets, with contracts with providers being renegotiated to align with that. This is due to complete in late Spring.","startDate":"2021-01-03","endDate":"2029-04-30","scheduleNarrative":"The project's end-date at 22/23-Q4 is 2029-04-30. This is primarily due to the following factors. In Quarter 4, the programme gained agreement to a revised business case for a re-baselined programme of delivery, and contracts with providers are being renegotiated to align to that new agreed position. Once completed, the programme expects to be back on track to deliver updated targets within the original schedule, and the Programme is set to be rated as green in delivery confidence. The re-negotiation of contracts is due to complete in late Spring.","fyBaseline":1895.17,"fyForecast":1114.36,"fyVariance":-41.0,"varianceNarrative":"The Affordable Homes Programme has delivered c. 4,400 fewer starts on site than originally forecast this year, leading to less capital spend than planned. This is primary due to changes in the wider economy and environment for social housing landlords impacting providers ability to fund new development. The programme is currently in the process of re-negotiating contracts with providers in order to address the additional costs, as a result of changes to the economy. It is expected that some of the lost delivery is re-forecast and planned in future years, but some may fall away completely. The re-negotiation of contracts is due to complete in late Spring.","wholeLifeCost":11583.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 22/23-Q4 is 11583m. This is primarily due to the following factors. Whole life costs for the programme have remained the same as last year, however overall delivery will fall short of the original business case. This is primarily due to high inflation impacting the costs of building new development. The grant assumptions made in 2020 will no longer support the level of delivery expected at the time. Since then, the programme has gained agreement for a revised, re-baselined business case and contracts with providers are being renegotiated to align with that. Once complete, the programme is expecting to be rated as green for delivery confidence.","benefits":20796.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 20796m. The project's departmental-agree monetised benefits at 22/23-Q4 is 20796m. The estimated benefits arising from the Affordable Homes Programmes delivery in 2022/23 are valued at around 165 million. This is based on having delivered 4,000 homes in the 2022/23 financial year, the same figure assumed in the January baseline and business case assumptions on benefits per unit. The vast majority of the benefits delivered this financial year are wider societal benefits and are derived from the net private benefits of building new homes which the department monetises using the Land Value Uplift (LVU) framework, as per DLUHCs appraisal guide.","themes":["Delivery & schedule","Approvals & decisions","Cost & funding","Commercial & supply chain"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 is Amber. This is primarily due to the following factors. The programmes delivery confidence is currently rated as amber. This reflects the risk that the programme will be unable to deliver the commitments in the original business case because of changes in the wider…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 22/23-Q4 is 2029-04-30. This is primarily due to the following factors. In Quarter 4, the programme gained agreement to a revised business case for a re-baselined programme of delivery, and contracts with providers are being renegotiated to align to that new agreed position. Once completed, the programme expects to be back on track to deliver updated targets within the original schedule, and the Programme is set to be rated as green in delivery confidence. The re-negotiation of contracts is due to complete in late Spring.","narrativeClaimKind":null},{"id":"DLUHC_0138_2223-Q1","year":2024,"name":"Affordable Homes Programme","department":"DLUHC","category":"Infrastructure and Construction","description":"The Affordable Homes Programme (AHP) allocates grant funding to Local Authorities and Housing Associations to help support the capital costs of developing affordable housing for rent or sale.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 22/23-Q4, the Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber(SRO rating). This is primarily due to the following factors. As at March 24: We continue to assess the delivery confidence of the programme as amber. _x000D_ _x000D_ The programme continues to implement flexibilities to address cost pressures facing the sector.","startDate":"2021-01-03","endDate":"2029-04-30","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2029-04-30. This is primarily due to the following factors. As at March 24: The project's end-date is April 2029.","fyBaseline":2792.17,"fyForecast":2252.65,"fyVariance":-19.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The cost profile was re-baselined in 2023.","wholeLifeCost":11609.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 increased from 11583m. to 11609m. This is primarily due to the following factors. The whole life cost increased from 11583m to 11609m as a result of a small increase in resource costs due to increased commercial and legal fees. Capital costs have remained fixed.","benefits":20796.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 20796m. Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 20796m.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber(SRO rating). This is primarily due to the following factors. As at March 24: We continue to assess the delivery confidence of the programme as amber. _x000D_ _x000D_ The programme continues to implement flexibilities to address cost pressures facing…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2029-04-30. This is primarily due to the following factors. As at March 24: The project's end-date is April 2029.","narrativeClaimKind":null},{"id":"DLUHC_0138_2223-Q1","year":2025,"name":"Affordable Homes Programme (AHP)","department":"MHCLG","category":"Infrastructure and Construction","description":"The Affordable Homes Programme (AHP) allocates grant funding to Local Authorities and Housing Associations to help support the capital costs of developing affordable housing for rent or sale.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. We assess delivery confidence for the programme as Amber. The Affordable Homes Programme (21-26) is still on track to meet its overall target of delivering 110,000-130,000 homes, and received top ups of £800 million in the last year on top of the original £11.5 billion budget. The programme is still on track to meet its overall target, although in May the Greater London Authority announced a reduction in their targets for the Affordable Homes Programme (21-26). This target has now been reduced to 17,800-19,000 homes down from 23,900 – 27,200 for their original programme budget.","startDate":"2021-04-01","endDate":null,"scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 30/04/2029 to 31/03/2030. The project end date has changed. In July 2024 we agreed with the Greater London Authority an extension to the completions deadline to March 2030.","fyBaseline":2792.17,"fyForecast":2933.2,"fyVariance":5.05,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":12337.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 11,537 to 12,337. This programme has received £800m in top up funding which has led to an increase in our baseline WLC. We have a public commitment that this top up will deliver up to 7,800 additional affordable homes.","benefits":20796.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 20796. We are expecting a change to the baseline benefits once we have consolidated delivery changes into a revised business case.","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. We assess delivery confidence for the programme as Amber. The Affordable Homes Programme (21-26) is still on track to meet its overall target of delivering 110,000-130,000 homes, and received top ups of £800…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 30/04/2029 to 31/03/2030. The project end date has changed. In July 2024 we agreed with the Greater London Authority an extension to the completions deadline to March 2030.","narrativeClaimKind":null},{"id":"DLUHC_0138_2223-Q1","year":2026,"name":"Affordable Homes Programme (AHP)","department":"MHCLG","category":"Infrastructure and Construction","description":"The Affordable Homes Programme (AHP) is the grant funding vehicle used by Government for the delivery of social and affordable housing in England. It allocates grant funding to Registered Providers of social housing to help support the capital costs of developing affordable housing for rent or sale. In 2023, revised targets were agreed with the delivery agencies which re-baselined the Programme to a new delivery range of 110,000-130,000; this was announced in 2024.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. Following the data received from agencies, we have now reached at least the lower end of the overall target range of 110,000-130,000 homes. We expect a further c.10,000 housing starts with deadline extensions to follow in 26/27. While the GLA did not meet its 2021–26 target, it remains confident that delivery will increase under the extended timetable. This confidence is supported by its 2025/26 performance, which saw the highest number of starts delivered in the programme to date.","startDate":"2021-01-03","endDate":"2030-03-31","scheduleNarrative":"There has been no change to the schedule for the programme.","fyBaseline":3168.01,"fyForecast":3168.01,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":12230.5,"costNarrative":"The WLC remains the same. There has been a minor variance in year by year budgets following business planning outcomes in the department. We intend for the programme to spend to its full budget.","benefits":16559.67,"benefitsNarrative":"These benefits consist of increased housing supply from the construction of new social and affordable units (measured by Land Value Uplift), distributional benefits and wider fiscal impacts.","themes":["Delivery & schedule","Cost & funding","Governance & assurance","Technical & integration"],"evidenceExcerpt":"The SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. Following the data received from agencies, we have now reached at least the lower end of the overall target range of 110,000-130,000 homes. We expect a further c.10,000 housing starts with deadline extensions to follow in 26/27. While the GLA did not meet its 2021–26 target,…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"There has been no change to the schedule for the programme.","narrativeClaimKind":null}],"previous":{"id":"DLUHC_0138_2223-Q1","year":2025,"name":"Affordable Homes Programme (AHP)","department":"MHCLG","category":"Infrastructure and Construction","description":"The Affordable Homes Programme (AHP) allocates grant funding to Local Authorities and Housing Associations to help support the capital costs of developing affordable housing for rent or sale.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. We assess delivery confidence for the programme as Amber. The Affordable Homes Programme (21-26) is still on track to meet its overall target of delivering 110,000-130,000 homes, and received top ups of £800 million in the last year on top of the original £11.5 billion budget. The programme is still on track to meet its overall target, although in May the Greater London Authority announced a reduction in their targets for the Affordable Homes Programme (21-26). This target has now been reduced to 17,800-19,000 homes down from 23,900 – 27,200 for their original programme budget.","startDate":"2021-04-01","endDate":null,"scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 30/04/2029 to 31/03/2030. The project end date has changed. In July 2024 we agreed with the Greater London Authority an extension to the completions deadline to March 2030.","fyBaseline":2792.17,"fyForecast":2933.2,"fyVariance":5.05,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":12337.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 11,537 to 12,337. This programme has received £800m in top up funding which has led to an increase in our baseline WLC. We have a public commitment that this top up will deliver up to 7,800 additional affordable homes.","benefits":20796.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 20796. We are expecting a change to the baseline benefits once we have consolidated delivery changes into a revised business case.","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. We assess delivery confidence for the programme as Amber. The Affordable Homes Programme (21-26) is still on track to meet its overall target of delivering 110,000-130,000 homes, and received top ups of £800…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 30/04/2029 to 31/03/2030. The project end date has changed. In July 2024 we agreed with the Greater London Authority an extension to the completions deadline to March 2030.","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":null,"attentionScore":18,"attentionReasons":["Current published delivery confidence is Amber"]},{"id":"DEFRA_0349_2324-Q4","year":2026,"name":"Cefas Infrastructure to Support Future Delivery at Sea","department":"DEFRA","category":"Government Transformation and Service Delivery","description":"The Research Vessel (RV) Cefas Endeavour is due to come to the end of its planned design life in 2033. The project is at Outline Business Case and is seeking investment a for Preferred Option new RV with enhanced capability to continue our national critical data collection at sea activities for Defra and the UK Government, which includes sustainable fisheries, offshore energy, nature recovery, environmental regulation and emergency response. Our vision is to replace Endeavour with a modern, multi-disciplinary RV that enhances scientific capability (with additional deep and shallow water capability allowing for a delivery across a wider range of government departments), embraces emerging marine autonomous technologies (through a flexible ship design), supports net zero goals (dual fuel engines are capable of operating on future green technology as their technology readiness levels develop). Investment will also deliver key government missions to protect and restore nature, support national security and resilience and drive economic growth.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The SRO Delivery Confidence Assessment for the project at FY25/26 Q4 remains Amber. This reflects ongoing discussions to secure the necessary investment for the Preferred Option and reflect the status as at March 2025.","startDate":null,"endDate":null,"scheduleNarrative":"Compared to financial year 24/25-Q4, the project's planned end-date at 25/26-Q4 remained the same, reflecting the planned end of the design life of the current Cefas RV.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"","wholeLifeCost":152.89,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (at OBC and measured in £m) remained at £305m.","benefits":961.79,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (at OBC and measured in £m) remained at £1,748m.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Scope & requirements"],"evidenceExcerpt":"The SRO Delivery Confidence Assessment for the project at FY25/26 Q4 remains Amber. This reflects ongoing discussions to secure the necessary investment for the Preferred Option and reflect the status as at March 2025. Compared to financial year 24/25-Q4, the project's planned end-date at 25/26-Q4 remained the same, reflecting the planned end of the design…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's planned end-date at 25/26-Q4 remained the same, reflecting the planned end of the design life of the current Cefas RV.","narrativeClaimKind":null,"history":[{"id":"DEFRA_0349_2324-Q4","year":2025,"name":"Cefas Infrastructure to Support Future Delivery at Sea","department":"DEFRA","category":"Government Transformation and Service Delivery","description":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","startDate":"2022-04-01","endDate":null,"scheduleNarrative":"The project's end-date at 24/25-Q4 is scheduled to be 30/06/2031. This is primarily due to the following factors This timeline is based on likely durations that are in line with industry expectations for procuring, designing and building research vessels which can only commence once funding is confirmed, with project funding awaiting confirmation.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","wholeLifeCost":null,"costNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","benefits":null,"benefitsNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information The project's end-date at 24/25-Q4 is scheduled to be 30/06/2031. This is primarily due to the following factors This timeline is based on likely durations that are in line with industry expectations for procuring,…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 24/25-Q4 is scheduled to be 30/06/2031. This is primarily due to the following factors This timeline is based on likely durations that are in line with industry expectations for procuring, designing and building research vessels which can only commence once funding is confirmed, with project funding awaiting confirmation.","narrativeClaimKind":null},{"id":"DEFRA_0349_2324-Q4","year":2026,"name":"Cefas Infrastructure to Support Future Delivery at Sea","department":"DEFRA","category":"Government Transformation and Service Delivery","description":"The Research Vessel (RV) Cefas Endeavour is due to come to the end of its planned design life in 2033. The project is at Outline Business Case and is seeking investment a for Preferred Option new RV with enhanced capability to continue our national critical data collection at sea activities for Defra and the UK Government, which includes sustainable fisheries, offshore energy, nature recovery, environmental regulation and emergency response. Our vision is to replace Endeavour with a modern, multi-disciplinary RV that enhances scientific capability (with additional deep and shallow water capability allowing for a delivery across a wider range of government departments), embraces emerging marine autonomous technologies (through a flexible ship design), supports net zero goals (dual fuel engines are capable of operating on future green technology as their technology readiness levels develop). Investment will also deliver key government missions to protect and restore nature, support national security and resilience and drive economic growth.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The SRO Delivery Confidence Assessment for the project at FY25/26 Q4 remains Amber. This reflects ongoing discussions to secure the necessary investment for the Preferred Option and reflect the status as at March 2025.","startDate":null,"endDate":null,"scheduleNarrative":"Compared to financial year 24/25-Q4, the project's planned end-date at 25/26-Q4 remained the same, reflecting the planned end of the design life of the current Cefas RV.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"","wholeLifeCost":152.89,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (at OBC and measured in £m) remained at £305m.","benefits":961.79,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (at OBC and measured in £m) remained at £1,748m.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Scope & requirements"],"evidenceExcerpt":"The SRO Delivery Confidence Assessment for the project at FY25/26 Q4 remains Amber. This reflects ongoing discussions to secure the necessary investment for the Preferred Option and reflect the status as at March 2025. Compared to financial year 24/25-Q4, the project's planned end-date at 25/26-Q4 remained the same, reflecting the planned end of the design…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's planned end-date at 25/26-Q4 remained the same, reflecting the planned end of the design life of the current Cefas RV.","narrativeClaimKind":null}],"previous":{"id":"DEFRA_0349_2324-Q4","year":2025,"name":"Cefas Infrastructure to Support Future Delivery at Sea","department":"DEFRA","category":"Government Transformation and Service Delivery","description":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","startDate":"2022-04-01","endDate":null,"scheduleNarrative":"The project's end-date at 24/25-Q4 is scheduled to be 30/06/2031. This is primarily due to the following factors This timeline is based on likely durations that are in line with industry expectations for procuring, designing and building research vessels which can only commence once funding is confirmed, with project funding awaiting confirmation.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","wholeLifeCost":null,"costNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","benefits":null,"benefitsNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information The project's end-date at 24/25-Q4 is scheduled to be 30/06/2031. This is primarily due to the following factors This timeline is based on likely durations that are in line with industry expectations for procuring,…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 24/25-Q4 is scheduled to be 30/06/2031. This is primarily due to the following factors This timeline is based on likely durations that are in line with industry expectations for procuring, designing and building research vessels which can only commence once funding is confirmed, with project funding awaiting confirmation.","narrativeClaimKind":null},"ratingDelta":null,"transition":"Not comparable","endDateDeltaDays":null,"attentionScore":18,"attentionReasons":["Current published delivery confidence is Amber"]},{"id":"HO_0042_2021-Q3","year":2026,"name":"Cerberus","department":"HO","category":"Government Transformation and Service Delivery","description":"Cerberus is the Home Office programme to modernise how the UK border identifies risk in people and goods before they arrive and as they cross the border. It brings together data from multiple sources and uses analytics to help officers focus on the highest risk passengers, vehicles and freight, while allowing legitimate travel and trade to flow more smoothly. Cerberus supports both passenger and freight movements. Its current focus is on transforming air passenger targeting and improving risk assessment for roll on roll off freight, alongside strengthening data governance, system resilience and security. This supports the planned retirement of legacy systems that are costly to run and increasingly unreliable, reducing long term technology cost and operational risk. The overarching aim of Cerberus is to strengthen border security by improving the quality and timeliness of targeting decisions. It is designed to increase the detection of criminal activity such as organised immigration crime, smuggling and other high‑harm threats, while reducing unnecessary checks that disrupt the public and businesses. By providing better information to intelligence and operational teams, the programme supports more efficient use of resources and more effective interventions at the border and upstream. Looking ahead, Cerberus provides the digital foundation for a more data‑driven border. It is being delivered in stages, allowing the Home Office to stabilise delivery, learn from ongoing technology trials, and adapt future plans as evidence and operational insight develop.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained AMBER. This reflects a balanced position of continued delivery progress alongside the scale, complexity, and transition risks inherent in the programme’s next delivery phase. The programme has demonstrated improved delivery confidence over the last year through strengthened programme management, clearer ownership of the product backlog, and effective closure of critical recommendations from previous NISTA assurance activity. Delivery performance has stabilised, with Cerberus continuing to forecast delivery within its agreed cost, schedule, and quality parameters and evidencing more mature planning, governance, and risk management practices. The AMBER rating also reflects the scale and ambition of Cerberus as a Tier A GMPP programme, including complex data integration, operational dependency management, and transition from legacy systems. While delivery confidence has improved, residual risks remain around supplier transition, dependency management, and the coordination of business change alongside technical delivery. These risks are recognised and actively managed through strengthened governance, enhanced assurance, and closer collaboration between the programme team, Home Office Digital, and operational stakeholders. Overall, the maintained AMBER rating provides a fair and proportionate reflection of Cerberus’ improving delivery trajectory, while recognising the inherent complexity of delivering large‑scale, data‑enabled border security capabilities within a live operational environment.","startDate":"2019-12-31","endDate":"2030-03-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same. Despite earlier delivery challenges and the need to re sequence activity in response to technical, supplier and operational dependencies, the programme has remained focused on delivery. The revised delivery profile supports the completion of priority capability within a complex operating environment, while allowing for greater delivery confidence following programme stabilisation. The schedule continues to be driven by the need to complete critical passenger and goods targeting capabilities, including Air Passenger and RoRo delivery, which sit on the critical path to the decommissioning of legacy systems. Maintaining the existing end date has required re‑sequencing activity within the delivery plan to prioritise operational readiness, data quality, and assurance requirements, particularly where earlier phases identified the need to strengthen audit and controls before progressing further capability. In addition, the programme operates within a highly interdependent delivery environment, relying on upstream data pipelines, shared platforms, and alignment with wider Border Force and Home Office transformation activity. The schedule reflects these dependencies and is designed to minimise risk to frontline operations while ensuring Cerberus delivers a sustainable, multi‑modal targeting capability. Overall, retaining the previously published end‑date demonstrates that Cerberus has absorbed delivery complexity through re-planning and prioritisation rather than extending the programme timeline, while maintaining confidence in the achievability of the final end state.","fyBaseline":37.48,"fyForecast":38.75,"fyVariance":3.41,"varianceNarrative":"The budget variance is 5%, driven primarily by higher transition costs within CDEL arising from the transition from our current supplier to an in-house delivery capability led by HO Digital. A further element of the variance relates to Monitoring and Evaluation (M&E) activity, which represents an agreed pressure. The M&E work was a condition of the InvestCo arrangement and was not supported by a corresponding budget allocation, resulting in the remaining variance.","wholeLifeCost":285.1,"costNarrative":"Compared to financial year 24/25 Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) increased from £240.970m to £288.70m. This is primarily driven by higher transition costs resulting from the supplier change. Monitoring and Evaluation work as part of the InvesCo condition, and a review of run costs.","benefits":175.45,"benefitsNarrative":"Compared to FY 2024/25 Q4, the project’s departmentally agreed benefits at FY 2025/26 Q4 (measured in £) have remained stable. This reflects the continued maturity of the benefits baseline, with no material changes to agreed benefit assumptions during the period. This position is primarily due to the following factors - Benefits baseline stability. The departmentally agreed benefits baseline was confirmed and locked in FY 2024/25, with no material changes approved during the current reporting period. No material scope change There have been no significant changes to project scope that would materially increase or reduce the agreed benefits profile. Timing of benefits realisation. The majority of financial benefits remain scheduled for realisation in later phases of delivery, rather than within the FY 2025/26 Q4 reporting window. Assumptions unchanged. Key benefits assumptions (including volumes, behaviours, and dependency milestones) remain consistent with those previously approved through governance. Dependency alignment. Planned benefits remain dependent on the successful delivery and adoption of linked capabilities and operational changes, which are proceeding broadly as expected but have not yet triggered additional monetised benefits. No re profiling agreed. No re profiling or re valuation of benefits has been agreed through departmental governance during the period.","themes":["Delivery & schedule","Technical & integration","Cost & funding","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained AMBER. This reflects a balanced position of continued delivery progress alongside the scale, complexity, and transition risks inherent in the programme’s next delivery phase. The programme has demonstrated improved delivery confidence over the…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same. Despite earlier delivery challenges and the need to re sequence activity in response to technical, supplier and operational dependencies, the programme has remained focused on delivery. The revised delivery profile supports the completion of priority capability within a complex operating environment, while allowing for greater delivery confidence following programme stabilisation. The schedule continues to be driven by the need to complete critical passenger and goods targeting capabilities, including Air Passenger and RoRo delivery, which sit on the critical path to the decommissioning of legacy systems. Maintaining the existing end date has required re‑sequencing activity within the delivery plan to prioritise operational readiness, data quality, and assurance requirements, particularly where earlier phases identified the need to strengthen audit and controls before progressing further capability. In addition, the programme operates within a highly interdependent delivery environment, relying on upstream data pipelines, shared platforms, and alignment with wider Border Force and Home Office transformation activity. The schedule reflects these dependencies and is designed to minimise risk to frontline operations while ensuring Cerberus delivers a sustainable, multi‑modal targeting capability. Overall, retaining the previously published end‑date demonstrates that Cerberus has absorbed delivery complexity through re-planning and prioritisation rather than extending the programme timeline, while maintaining confidence in the achievability of the final end state.","narrativeClaimKind":null,"history":[{"id":"HO_0042_2021-Q3","year":2021,"name":"Cerberus","department":"HO","category":"Government Transformation and Service Delivery","description":"Border Force is making a transformative change to its analytics and targeting capabilities, better securing the border with improved operational outcomes, driving operational efficiencies, and therefore achieving considerable cashable savings through the decommissioning of expensive legacy systems.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber.This is primarily due to the following factors: Delivery is progressing largely as planned using an agile methodology and to date has delivered a live capability that is in operational use, albeit in a limited capacity. The programme is carrying some resource, governance and technical delivery risks but this is unlikely to affect key deliverables or lead to a significant increase in cost. In fact, action being taken to address these issues are likely to mitigate future risk and potentially provide opportunities for cost savings. As a result some anticipated benefit realisation in 2021/22 is likely to be slowed and move into 2022/23 but the programme are not predicting an impact on the long-term benefits.","startDate":"2019-10-01","endDate":"2024-04-01","scheduleNarrative":"The project end-date is 01 April 2024. This is primarily due to the following factors: The programme is on track to be completed by the end of 2023/24. The timeline allows for the incremental delivery of data sets and targeting modes along with the underlying capabilities. This incremental approach to delivery allows for a steady and manageable change process which boosts feedback at each stage. This feedback can be thoroughly explored, and the agile working of the project means that changes required can be added into delivery plans. In addition, the timeline and sequencing of activities has been arranged to allow for the changes in technology and ways of working to land effectively and for the resulting capabilities to be fully leveraged.","fyBaseline":28.5,"fyForecast":28.5,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":172.1,"costNarrative":"The projects Baseline Whole Life Cost is �172.10m. This is primarily due to the following factors: Baseline WLC: Key factors that led to Cerberus project to set its Q4 2020/21 Baseline Whole life Cost are: External HMRC data source funding External industry data source funding Fixing data quality issues with providers Big Match and Entity Search may be insufficient to meet the requirements of the project requiring an additional technology Need to invest in business change resource to cover deficiency in change management Decommissioning- Semaphore run cost vstride cost Training development cost FTS user licence cost","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Technical & integration","Delivery & schedule","Workforce & capability"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber.This is primarily due to the following factors: Delivery is progressing largely as planned using an agile methodology and to date has delivered a live capability that is in operational use, albeit in a limited capacity. The programme is carrying some resource, governance…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project end-date is 01 April 2024. This is primarily due to the following factors: The programme is on track to be completed by the end of 2023/24. The timeline allows for the incremental delivery of data sets and targeting modes along with the underlying capabilities. This incremental approach to delivery allows for a steady and manageable change process which boosts feedback at each stage. This feedback can be thoroughly explored, and the agile working of the project means that changes required can be added into delivery plans. In addition, the timeline and sequencing of activities has been arranged to allow for the changes in technology and ways of working to land effectively and for the resulting capabilities to be fully leveraged.","narrativeClaimKind":null},{"id":"HO_0042_2021-Q3","year":2022,"name":"Cerberus","department":"HO","category":"Government Transformation and Service Delivery","description":"Border Force is making a transformative change to its analytics and targeting capabilities, better securing the border with improved operational outcomes, driving operational efficiencies, and therefore achieving considerable cashable savings through the decommissioning of expensive legacy systems.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 remained at Amber Overall delivery confidence remains at Amber. Cerberus is a complex project with dependencies being managed and delivered across multiple products. New capabilities have been delivered into the business and are beginning to be used operationally. At the same time, Cerberus continues to ingest and exploit new data sets to improve targeting capability and develop risk scoring and experimentation capabilities. The key Q1 delivery milestones for the Cerberus are within the Air Passenger and RoRo modes.","startDate":"2019-10-01","endDate":"2024-04-01","scheduleNarrative":"Compared to 2021-Q4, your project end-date remained scheduled to finish on 01 APR 2024 . This is primarily due to the following factors: The programme is on track to be completed by the end of 2023/24. The timeline allows for the incremental delivery of data sets and targeting modes along with the underlying capabilities. This incremental approach to delivery allows for a steady and manageable change process which boosts feedback at each stage. This feedback can be thoroughly explored, and the agile working of the project means that changes required can be added into delivery plans. In addition, the timeline and sequencing of activities has been arranged to allow for the changes in technology and ways of working to land effectively and for the resulting capabilities to be fully leveraged.","fyBaseline":34.3,"fyForecast":34.3,"fyVariance":0.0,"varianceNarrative":"The budget variance is inferior or equal to 5%.","wholeLifeCost":172.0,"costNarrative":"Compared to 2021-Q4,the projects Baseline Whole Life Cost remained at 172.10 (£m). This is primarily due to the following factors: Cerberus has successfully received a three-year funding allocation from the recent Spending Review. Cerberus is funded in FY22/23 by Border Force Change, with supplementary funding from the Multi-Agency Hub Board for work around General Aviation. Costs in this section are nominal (without inflation): Of the allocated funding for FY22/23, a total of £27.6m is Capital Departmental Expenditure Limits and £5.2m is Resource Departmental Expenditure Limits, which is £32.8m Total Departmental Expenditure Limits. The forecast expenditure for FY22/23 is £28.4m Capital Departmental Expenditure Limits and £4.3m Resource Departmental Expenditure Limits. The project team are looking at options to rebalance forecast costs in accordance with the budget. Future years will be confirmed through the annual allocation process but stand provisionally for FY23/24 at £19.4m change Capital Departmental Expenditure Limits, £2.9m change Resource Departmental Expenditure Limits and for FY24/25 at £6.7m change Capital Departmental Expenditure Limits, £1.7m change Resource Departmental Expenditure Limits.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Workforce & capability","Technical & integration"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 remained at Amber Overall delivery confidence remains at Amber. Cerberus is a complex project with dependencies being managed and delivered across multiple products. New capabilities have been delivered into the business and are…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to 2021-Q4, your project end-date remained scheduled to finish on 01 APR 2024 . This is primarily due to the following factors: The programme is on track to be completed by the end of 2023/24. The timeline allows for the incremental delivery of data sets and targeting modes along with the underlying capabilities. This incremental approach to delivery allows for a steady and manageable change process which boosts feedback at each stage. This feedback can be thoroughly explored, and the agile working of the project means that changes required can be added into delivery plans. In addition, the timeline and sequencing of activities has been arranged to allow for the changes in technology and ways of working to land effectively and for the resulting capabilities to be fully leveraged.","narrativeClaimKind":null},{"id":"HO_0042_2021-Q3","year":2023,"name":"Cerberus","department":"HO","category":"Government Transformation and Service Delivery","description":"Border Force is making a transformative change to its analytics and targeting capabilities, better securing the border with improved operational outcomes, driving operational efficiencies, and therefore achieving considerable cashable savings through the decommissioning of expensive legacy systems.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 decreased from Amber (IPA rating) to Red (SRO rating). This is primarily due to the following factors. In Financial Year 22/23 Cerberus set out to deliver eight Level0 milestones, achieving five. Three milestones covering Air Passenger and Sea Containers modes have been moved or re-planned into future delivery. Our red rating reflects complexities in delivering Air Passenger and RoRo milestones at the end of Financial Year 22/23. A programme decision was made to focus delivery on achieving the RoRo milestone (met on the 31/03/2023), as a result the delivery of an Air Passenger Minimal Viable Product has moved into Financial Year 23/24. Discussions are currently underway to agree plans for an Air Passenger Minimal Viable Product.","startDate":"2019-10-01","endDate":"2025-03-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 increased from 2024-04-01 to 2025-03-31. This is primarily due to the following factors. The original end date of the programme was recorded incorrectly in GMPP reporting and is now recorded correctly.","fyBaseline":43.9,"fyForecast":43.9,"fyVariance":0.0,"varianceNarrative":"The budget variance is inferior or equal to 5%. Not required as variance is less than 5%","wholeLifeCost":198.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 increased from 172m. to 198m. This is primarily due to the following factors. Whole Life Cost - 198.2m (including sunk costs)- The Whole Life Cost of 172m excludes sunk costs.","benefits":172.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 172m. The project's departmental-agree monetised benefits at 22/23-Q4 is 172m. At the end of Financial Year 21/22, Cerberus delivered functionality to the decommissioning of BSM system. Since this point associated costs have been saved which are cashable to the Home Office at a value of 0.5million per annum. At the end of Financial Year 22/23 further releases have enabled a reduction in FTS user licences resulting in a further 0.3million per annum cashable saving. This functionality is also forecast to realise benefits associated with increased threat interdiction. A proportion of these can be monetised with a value of approximately 9.3million over the appraisal period. Further technology savings will be realised later than originally forecast due to delays of project milestones. Delivery in Air passengers and Sea container modes will realise a further 11.7million per annum cashable savings in this area. Interdiction benefits will also continue to accrue and increase up to a total of 65.9million of monetised benefits over the appraisal period, alongside strategic benefits from non-monetised threats. Further delivery will also facilitate efficiency savings cashable to the Home Office with a value of approximately 7.0million over the appraisal period. Further efficiency benefits are expected from increased automation, but these have not yet been quantified. This is an area of focus in the near future.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 decreased from Amber (IPA rating) to Red (SRO rating). This is primarily due to the following factors. In Financial Year 22/23 Cerberus set out to deliver eight Level0 milestones, achieving five. Three milestones covering Air Passenger and Sea Containers modes have…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 increased from 2024-04-01 to 2025-03-31. This is primarily due to the following factors. The original end date of the programme was recorded incorrectly in GMPP reporting and is now recorded correctly.","narrativeClaimKind":null},{"id":"HO_0042_2021-Q3","year":2024,"name":"Cerberus","department":"HO","category":"Government Transformation and Service Delivery","description":"Border Force is making a transformative change to it's analytics and targeting capabilities better securing the border within improved operational outcomes, driving operational efficiencies and therefore achieving considerable cashable savings through the decommissioning of expensive legacy systems.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Delivery Confidence Assessment rating at 23/24-Q4 decreased from Red(SRO rating) to Amber(IPA rating). This is primarily due to the following factors. At Q4 new senior resource was brought into the Programme to help improve delivery, and get the Programme on the trajectory to Green. Q4 delivery confidence remained RED but is trending down._x000D_ Test and fix approaches have been improved already along with the allocation of specific delivery managers for specific releases. _x000D_ A full review of governance and control processes are ongoing. A number of new structures have been put in place already around risk management and reporting to allow for maturing conversation within the Programme. This work will continue for the remainder of the Programme.","startDate":"2019-10-01","endDate":"2025-03-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2025-03-31. This is primarily due to the following factors. The programme is still on track to finish as scheduled on 31st March 2025","fyBaseline":27.9,"fyForecast":39.2,"fyVariance":41.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. Not required as budget variance is inferior or equal to 5%","wholeLifeCost":147.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 decreased from 198m. to 147m. This is primarily due to the following factors. The programme is currently preparing a new business case for FY 24/25 where an indicative budget of 27.88m has been allocated and an options document is being prepared for InvestCo review. Until the business case has been finalised the WLC may or may not be affected.","benefits":56.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 2324-Q4 decreased from 172m. to 56m. Cerberus is already beginning to increase threat interdiction at the UK border. Some of this increase has an economic benefit to the UK, saving more than 10m p/a. Cerberus functionality will also enable the decommissioning of legacy systems, realising cashable savings to the Home Office of 12m p/a, a portion of which has already been achieved. Other benefits of further delivery include increased workforce efficiency.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Delivery Confidence Assessment rating at 23/24-Q4 decreased from Red(SRO rating) to Amber(IPA rating). This is primarily due to the following factors. At Q4 new senior resource was brought into the Programme to help improve delivery, and get the Programme on the trajectory to Green. Q4 delivery confidence remained…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2025-03-31. This is primarily due to the following factors. The programme is still on track to finish as scheduled on 31st March 2025","narrativeClaimKind":null},{"id":"HO_0042_2021-Q3","year":2025,"name":"Cerberus","department":"HO","category":"Government Transformation and Service Delivery","description":"Border Force is making a transformative change to its analytics and targeting capabilities to identify the movement of high-risk goods and people across the UK border. This will enable border security through, improved operational outcomes, driving operational efficiencies, and achieving considerable cashable savings through the decommissioning of expensive legacy systems. Cerberus is in operational use today, targeting a subset of border movements, delivering both operational benefit and cashable savings. The operational use of the system will be expanded to new transport modes and users throughout the remainder of the project’s delivery, with additional functionality being developed and datasets added to further improve the efficiency and effectiveness of the system.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The Delivery Confidence Assessment is rated Amber because successful delivery of the programme to time, cost and quality appears feasible but there are some issues which already exist requiring management attention. Whilst significant progress has been made in the last year, the programme accepts that challenges around delivery and change management, and business preparedness still exist and as such these are being focused to be improved.","startDate":"2019-10-01","endDate":"2030-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2025 to 31/03/2030. This is primarily due to the following factors‚ The programmes previous end date was March 2025 as previously this was when funding was secured for. Following ongoing engagement with NISTA, further funding was sought to continue developing Cerberus post 25 to the end of the appraisal period 29/30 which is reflected in the new end-date.","fyBaseline":47.18,"fyForecast":27.88,"fyVariance":40.91,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ We reviewed run cost as part of OB and the figures have since changed. This means that the variance should be £300k underspend (1.1% of the allocated budget).","wholeLifeCost":240.97,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 147 to 240. This is primarily due to the following factors‚ This is due to the Run Cost being reviewed and the Programme WLC now covers up to FY34/35 rather than FY29/30.","benefits":197.63,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 56 to 197. This is primarily due to the following factors‚ Cerberus has been rolled out to the first cohort of users; interdiction benefits are forecast to accelerate as a result.","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The Delivery Confidence Assessment is rated Amber because successful delivery of the programme to time, cost and quality appears feasible but there are some issues…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2025 to 31/03/2030. This is primarily due to the following factors‚ The programmes previous end date was March 2025 as previously this was when funding was secured for. Following ongoing engagement with NISTA, further funding was sought to continue developing Cerberus post 25 to the end of the appraisal period 29/30 which is reflected in the new end-date.","narrativeClaimKind":null},{"id":"HO_0042_2021-Q3","year":2026,"name":"Cerberus","department":"HO","category":"Government Transformation and Service Delivery","description":"Cerberus is the Home Office programme to modernise how the UK border identifies risk in people and goods before they arrive and as they cross the border. It brings together data from multiple sources and uses analytics to help officers focus on the highest risk passengers, vehicles and freight, while allowing legitimate travel and trade to flow more smoothly. Cerberus supports both passenger and freight movements. Its current focus is on transforming air passenger targeting and improving risk assessment for roll on roll off freight, alongside strengthening data governance, system resilience and security. This supports the planned retirement of legacy systems that are costly to run and increasingly unreliable, reducing long term technology cost and operational risk. The overarching aim of Cerberus is to strengthen border security by improving the quality and timeliness of targeting decisions. It is designed to increase the detection of criminal activity such as organised immigration crime, smuggling and other high‑harm threats, while reducing unnecessary checks that disrupt the public and businesses. By providing better information to intelligence and operational teams, the programme supports more efficient use of resources and more effective interventions at the border and upstream. Looking ahead, Cerberus provides the digital foundation for a more data‑driven border. It is being delivered in stages, allowing the Home Office to stabilise delivery, learn from ongoing technology trials, and adapt future plans as evidence and operational insight develop.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained AMBER. This reflects a balanced position of continued delivery progress alongside the scale, complexity, and transition risks inherent in the programme’s next delivery phase. The programme has demonstrated improved delivery confidence over the last year through strengthened programme management, clearer ownership of the product backlog, and effective closure of critical recommendations from previous NISTA assurance activity. Delivery performance has stabilised, with Cerberus continuing to forecast delivery within its agreed cost, schedule, and quality parameters and evidencing more mature planning, governance, and risk management practices. The AMBER rating also reflects the scale and ambition of Cerberus as a Tier A GMPP programme, including complex data integration, operational dependency management, and transition from legacy systems. While delivery confidence has improved, residual risks remain around supplier transition, dependency management, and the coordination of business change alongside technical delivery. These risks are recognised and actively managed through strengthened governance, enhanced assurance, and closer collaboration between the programme team, Home Office Digital, and operational stakeholders. Overall, the maintained AMBER rating provides a fair and proportionate reflection of Cerberus’ improving delivery trajectory, while recognising the inherent complexity of delivering large‑scale, data‑enabled border security capabilities within a live operational environment.","startDate":"2019-12-31","endDate":"2030-03-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same. Despite earlier delivery challenges and the need to re sequence activity in response to technical, supplier and operational dependencies, the programme has remained focused on delivery. The revised delivery profile supports the completion of priority capability within a complex operating environment, while allowing for greater delivery confidence following programme stabilisation. The schedule continues to be driven by the need to complete critical passenger and goods targeting capabilities, including Air Passenger and RoRo delivery, which sit on the critical path to the decommissioning of legacy systems. Maintaining the existing end date has required re‑sequencing activity within the delivery plan to prioritise operational readiness, data quality, and assurance requirements, particularly where earlier phases identified the need to strengthen audit and controls before progressing further capability. In addition, the programme operates within a highly interdependent delivery environment, relying on upstream data pipelines, shared platforms, and alignment with wider Border Force and Home Office transformation activity. The schedule reflects these dependencies and is designed to minimise risk to frontline operations while ensuring Cerberus delivers a sustainable, multi‑modal targeting capability. Overall, retaining the previously published end‑date demonstrates that Cerberus has absorbed delivery complexity through re-planning and prioritisation rather than extending the programme timeline, while maintaining confidence in the achievability of the final end state.","fyBaseline":37.48,"fyForecast":38.75,"fyVariance":3.41,"varianceNarrative":"The budget variance is 5%, driven primarily by higher transition costs within CDEL arising from the transition from our current supplier to an in-house delivery capability led by HO Digital. A further element of the variance relates to Monitoring and Evaluation (M&E) activity, which represents an agreed pressure. The M&E work was a condition of the InvestCo arrangement and was not supported by a corresponding budget allocation, resulting in the remaining variance.","wholeLifeCost":285.1,"costNarrative":"Compared to financial year 24/25 Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) increased from £240.970m to £288.70m. This is primarily driven by higher transition costs resulting from the supplier change. Monitoring and Evaluation work as part of the InvesCo condition, and a review of run costs.","benefits":175.45,"benefitsNarrative":"Compared to FY 2024/25 Q4, the project’s departmentally agreed benefits at FY 2025/26 Q4 (measured in £) have remained stable. This reflects the continued maturity of the benefits baseline, with no material changes to agreed benefit assumptions during the period. This position is primarily due to the following factors - Benefits baseline stability. The departmentally agreed benefits baseline was confirmed and locked in FY 2024/25, with no material changes approved during the current reporting period. No material scope change There have been no significant changes to project scope that would materially increase or reduce the agreed benefits profile. Timing of benefits realisation. The majority of financial benefits remain scheduled for realisation in later phases of delivery, rather than within the FY 2025/26 Q4 reporting window. Assumptions unchanged. Key benefits assumptions (including volumes, behaviours, and dependency milestones) remain consistent with those previously approved through governance. Dependency alignment. Planned benefits remain dependent on the successful delivery and adoption of linked capabilities and operational changes, which are proceeding broadly as expected but have not yet triggered additional monetised benefits. No re profiling agreed. No re profiling or re valuation of benefits has been agreed through departmental governance during the period.","themes":["Delivery & schedule","Technical & integration","Cost & funding","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained AMBER. This reflects a balanced position of continued delivery progress alongside the scale, complexity, and transition risks inherent in the programme’s next delivery phase. The programme has demonstrated improved delivery confidence over the…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same. Despite earlier delivery challenges and the need to re sequence activity in response to technical, supplier and operational dependencies, the programme has remained focused on delivery. The revised delivery profile supports the completion of priority capability within a complex operating environment, while allowing for greater delivery confidence following programme stabilisation. The schedule continues to be driven by the need to complete critical passenger and goods targeting capabilities, including Air Passenger and RoRo delivery, which sit on the critical path to the decommissioning of legacy systems. Maintaining the existing end date has required re‑sequencing activity within the delivery plan to prioritise operational readiness, data quality, and assurance requirements, particularly where earlier phases identified the need to strengthen audit and controls before progressing further capability. In addition, the programme operates within a highly interdependent delivery environment, relying on upstream data pipelines, shared platforms, and alignment with wider Border Force and Home Office transformation activity. The schedule reflects these dependencies and is designed to minimise risk to frontline operations while ensuring Cerberus delivers a sustainable, multi‑modal targeting capability. Overall, retaining the previously published end‑date demonstrates that Cerberus has absorbed delivery complexity through re-planning and prioritisation rather than extending the programme timeline, while maintaining confidence in the achievability of the final end state.","narrativeClaimKind":null}],"previous":{"id":"HO_0042_2021-Q3","year":2025,"name":"Cerberus","department":"HO","category":"Government Transformation and Service Delivery","description":"Border Force is making a transformative change to its analytics and targeting capabilities to identify the movement of high-risk goods and people across the UK border. This will enable border security through, improved operational outcomes, driving operational efficiencies, and achieving considerable cashable savings through the decommissioning of expensive legacy systems. Cerberus is in operational use today, targeting a subset of border movements, delivering both operational benefit and cashable savings. The operational use of the system will be expanded to new transport modes and users throughout the remainder of the project’s delivery, with additional functionality being developed and datasets added to further improve the efficiency and effectiveness of the system.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The Delivery Confidence Assessment is rated Amber because successful delivery of the programme to time, cost and quality appears feasible but there are some issues which already exist requiring management attention. Whilst significant progress has been made in the last year, the programme accepts that challenges around delivery and change management, and business preparedness still exist and as such these are being focused to be improved.","startDate":"2019-10-01","endDate":"2030-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2025 to 31/03/2030. This is primarily due to the following factors‚ The programmes previous end date was March 2025 as previously this was when funding was secured for. Following ongoing engagement with NISTA, further funding was sought to continue developing Cerberus post 25 to the end of the appraisal period 29/30 which is reflected in the new end-date.","fyBaseline":47.18,"fyForecast":27.88,"fyVariance":40.91,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ We reviewed run cost as part of OB and the figures have since changed. This means that the variance should be £300k underspend (1.1% of the allocated budget).","wholeLifeCost":240.97,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 147 to 240. This is primarily due to the following factors‚ This is due to the Run Cost being reviewed and the Programme WLC now covers up to FY34/35 rather than FY29/30.","benefits":197.63,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 56 to 197. This is primarily due to the following factors‚ Cerberus has been rolled out to the first cohort of users; interdiction benefits are forecast to accelerate as a result.","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The Delivery Confidence Assessment is rated Amber because successful delivery of the programme to time, cost and quality appears feasible but there are some issues…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2025 to 31/03/2030. This is primarily due to the following factors‚ The programmes previous end date was March 2025 as previously this was when funding was secured for. Following ongoing engagement with NISTA, further funding was sought to continue developing Cerberus post 25 to the end of the appraisal period 29/30 which is reflected in the new end-date.","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":0,"attentionScore":18,"attentionReasons":["Current published delivery confidence is Amber"]},{"id":"UNPUBLISHED-2026-B87B1EE731","year":2026,"name":"Children's Homes Capital Programme","department":"DFE","category":"Infrastructure and Construction","description":"The department is investing grant funding to support local authorities and other providers to improve and expand the regional provision of secure children's homes and open children's homes as part of its commitment to deliver stable loving homes for vulnerable children in care.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Programme delivery confidence for 2025/26 is Amber. The programme has continued to make progress, but delivery confidence is impacted by the risk faced on a small number of complex, large‑scale capital projects in a sector where comparable facilities have not been delivered for many years. This risk is ongoing rather than new and reflects the technical and commercial challenge of delivering these schemes, with potential pressure on cost and timetable, rather than a lack of momentum. Targeted progress has been made on the highest‑risk projects. This includes securing planning approval and buy-in across relevant local authorities for the new West Midlands safe centre, the London Secure Children’s Home scheme proceeding towards planning submission and construction tender, as well as £53 million of grants being awarded for new Open Children’s Homes to support vulnerable children with complex needs. Construction of the Lincolnshire Secure Children’s Home remains on target for completion in autumn 2026 and occupation from May 2027. Looking ahead, delivery confidence will depend on these major projects moving through procurement and into construction without material delay or cost escalation. The priority is close oversight of the most complex schemes, refreshed forecasts with local partners, and active grant management to intervene early where risks emerge. Sustained grip on these projects will be critical to reducing risk and supporting a move towards Green in future reporting.","startDate":"2023-03-16","endDate":null,"scheduleNarrative":"No schedule narrative has been provided as this programme will not remain in GMPP.","fyBaseline":44.66,"fyForecast":44.66,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%","wholeLifeCost":610.13,"costNarrative":"This programme joined GMPP in 25/26 and will not remain in GMPP going forward. The Whole Life Costs are calculated through combining the approved capital budgets of the projects that make up this programme. As a capital programme, project budgets are reviewed and controlled at key gateways.","benefits":null,"benefitsNarrative":"This programme does not report monetised benefits, as per the approved business case.","themes":["Delivery & schedule","Cost & funding","Commercial & supply chain","Approvals & decisions"],"evidenceExcerpt":"Programme delivery confidence for 2025/26 is Amber. The programme has continued to make progress, but delivery confidence is impacted by the risk faced on a small number of complex, large‑scale capital projects in a sector where comparable facilities have not been delivered for many years. This risk is ongoing rather than new and reflects the technical and…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"No schedule narrative has been provided as this programme will not remain in GMPP.","narrativeClaimKind":null,"history":[{"id":"UNPUBLISHED-2026-B87B1EE731","year":2026,"name":"Children's Homes Capital Programme","department":"DFE","category":"Infrastructure and Construction","description":"The department is investing grant funding to support local authorities and other providers to improve and expand the regional provision of secure children's homes and open children's homes as part of its commitment to deliver stable loving homes for vulnerable children in care.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Programme delivery confidence for 2025/26 is Amber. The programme has continued to make progress, but delivery confidence is impacted by the risk faced on a small number of complex, large‑scale capital projects in a sector where comparable facilities have not been delivered for many years. This risk is ongoing rather than new and reflects the technical and commercial challenge of delivering these schemes, with potential pressure on cost and timetable, rather than a lack of momentum. Targeted progress has been made on the highest‑risk projects. This includes securing planning approval and buy-in across relevant local authorities for the new West Midlands safe centre, the London Secure Children’s Home scheme proceeding towards planning submission and construction tender, as well as £53 million of grants being awarded for new Open Children’s Homes to support vulnerable children with complex needs. Construction of the Lincolnshire Secure Children’s Home remains on target for completion in autumn 2026 and occupation from May 2027. Looking ahead, delivery confidence will depend on these major projects moving through procurement and into construction without material delay or cost escalation. The priority is close oversight of the most complex schemes, refreshed forecasts with local partners, and active grant management to intervene early where risks emerge. Sustained grip on these projects will be critical to reducing risk and supporting a move towards Green in future reporting.","startDate":"2023-03-16","endDate":null,"scheduleNarrative":"No schedule narrative has been provided as this programme will not remain in GMPP.","fyBaseline":44.66,"fyForecast":44.66,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%","wholeLifeCost":610.13,"costNarrative":"This programme joined GMPP in 25/26 and will not remain in GMPP going forward. The Whole Life Costs are calculated through combining the approved capital budgets of the projects that make up this programme. As a capital programme, project budgets are reviewed and controlled at key gateways.","benefits":null,"benefitsNarrative":"This programme does not report monetised benefits, as per the approved business case.","themes":["Delivery & schedule","Cost & funding","Commercial & supply chain","Approvals & decisions"],"evidenceExcerpt":"Programme delivery confidence for 2025/26 is Amber. The programme has continued to make progress, but delivery confidence is impacted by the risk faced on a small number of complex, large‑scale capital projects in a sector where comparable facilities have not been delivered for many years. This risk is ongoing rather than new and reflects the technical and…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"No schedule narrative has been provided as this programme will not remain in GMPP.","narrativeClaimKind":null}],"previous":null,"ratingDelta":null,"transition":"Not comparable","endDateDeltaDays":null,"attentionScore":18,"attentionReasons":["Current published delivery confidence is Amber"]},{"id":"MOJ_0537_2526-Q1","year":2026,"name":"Community Support Programme","department":"MOJ","category":"Government Transformation and Service Delivery","description":"Design, commission, procure and implement new rehabilitative services.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Delivery Confidence Assessment (DCA) rating at 25/26-Q4 is Amber. This is largely due to anticipated reduction in funding resulting in the potential for changes in project scope.","startDate":"2023-03-01","endDate":"2029-03-09","scheduleNarrative":"The programme's end date at 25/26-Q4 is scheduled for 09/03/2029. The project is on track to deliver against the baseline schedule.","fyBaseline":2.05,"fyForecast":2.05,"fyVariance":0.0,"varianceNarrative":"The budget variance is less or equal to 5%.","wholeLifeCost":1024.83,"costNarrative":"The programme's Whole Life Costs for 25/26-Q4 are £1,024.83m. The Whole Life Costs are based on the most recent business case and include optimism bias.","benefits":null,"benefitsNarrative":"The programme has not provided details of monetised benefits for financial year 25/26-Q4. This project currently reports no monetised benefits. The project benefits focus on the quality of services contracts.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Scope & requirements"],"evidenceExcerpt":"The Delivery Confidence Assessment (DCA) rating at 25/26-Q4 is Amber. This is largely due to anticipated reduction in funding resulting in the potential for changes in project scope. The programme's end date at 25/26-Q4 is scheduled for 09/03/2029. The project is on track to deliver against the baseline schedule.","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The programme's end date at 25/26-Q4 is scheduled for 09/03/2029. The project is on track to deliver against the baseline schedule.","narrativeClaimKind":null,"history":[{"id":"MOJ_0537_2526-Q1","year":2026,"name":"Community Support Programme","department":"MOJ","category":"Government Transformation and Service Delivery","description":"Design, commission, procure and implement new rehabilitative services.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Delivery Confidence Assessment (DCA) rating at 25/26-Q4 is Amber. This is largely due to anticipated reduction in funding resulting in the potential for changes in project scope.","startDate":"2023-03-01","endDate":"2029-03-09","scheduleNarrative":"The programme's end date at 25/26-Q4 is scheduled for 09/03/2029. The project is on track to deliver against the baseline schedule.","fyBaseline":2.05,"fyForecast":2.05,"fyVariance":0.0,"varianceNarrative":"The budget variance is less or equal to 5%.","wholeLifeCost":1024.83,"costNarrative":"The programme's Whole Life Costs for 25/26-Q4 are £1,024.83m. The Whole Life Costs are based on the most recent business case and include optimism bias.","benefits":null,"benefitsNarrative":"The programme has not provided details of monetised benefits for financial year 25/26-Q4. This project currently reports no monetised benefits. The project benefits focus on the quality of services contracts.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Scope & requirements"],"evidenceExcerpt":"The Delivery Confidence Assessment (DCA) rating at 25/26-Q4 is Amber. This is largely due to anticipated reduction in funding resulting in the potential for changes in project scope. The programme's end date at 25/26-Q4 is scheduled for 09/03/2029. The project is on track to deliver against the baseline schedule.","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The programme's end date at 25/26-Q4 is scheduled for 09/03/2029. The project is on track to deliver against the baseline schedule.","narrativeClaimKind":null}],"previous":null,"ratingDelta":null,"transition":"Not comparable","endDateDeltaDays":null,"attentionScore":18,"attentionReasons":["Current published delivery confidence is Amber"]},{"id":"HO_0526_2526-Q1","year":2026,"name":"Concordis","department":"NCA","category":"Government Transformation and Service Delivery","description":"As a result of an impending lease-end, the NCA must leave its existing London Headquarters in Spring Gardens, Vauxhall. But it is, in any case, end of life, too big for NCA needs, expensive to run and unable to adapt to future needs due to factors such as the poor layout and age. The main focus for the Concordis programme is the delivery of the NCA’s new Headquarters in Stratford and transition of staff, the reconfiguration of the South Eastern Operational Branch to accommodate a joint operational partnership team, and the closure of Spring Gardens. This is part of the Agency’s broader Estates Strategy","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Concordis joined the GMPP, separate to the NCA Portfolio, from Q1 2025/26 due to the size, complexity and delivery status of the Programme. The delivery confidence has remained at Amber from Q1 to Q4 taking in to account that successful delivery of the programme to time, cost and quality appears feasible. Significant issues have emerged requiring management attention. These were resolvable and addressed promptly, so as not to present a cost/schedule overrun.","startDate":null,"endDate":null,"scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same. This is primarily due to managed governance models, strong RAID management and a comprehensive integrated plan.","fyBaseline":53.58,"fyForecast":53.58,"fyVariance":0.0,"varianceNarrative":"The budget variance for FY 2025/26 is less than 5%","wholeLifeCost":189.75,"costNarrative":"Concordis whole Life Cost of 189.95m remained the same during the FY period 2025/26.","benefits":120.62,"benefitsNarrative":"Concordis monetised benefits of 149.30m remained the same during the FY period 2025/26.","themes":["Cost & funding","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Concordis joined the GMPP, separate to the NCA Portfolio, from Q1 2025/26 due to the size, complexity and delivery status of the Programme. The delivery confidence has remained at Amber from Q1 to Q4 taking in to account that successful delivery of the programme to time, cost and quality appears feasible. Significant issues have emerged requiring management…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same. This is primarily due to managed governance models, strong RAID management and a comprehensive integrated plan.","narrativeClaimKind":null,"history":[{"id":"HO_0526_2526-Q1","year":2026,"name":"Concordis","department":"NCA","category":"Government Transformation and Service Delivery","description":"As a result of an impending lease-end, the NCA must leave its existing London Headquarters in Spring Gardens, Vauxhall. But it is, in any case, end of life, too big for NCA needs, expensive to run and unable to adapt to future needs due to factors such as the poor layout and age. The main focus for the Concordis programme is the delivery of the NCA’s new Headquarters in Stratford and transition of staff, the reconfiguration of the South Eastern Operational Branch to accommodate a joint operational partnership team, and the closure of Spring Gardens. This is part of the Agency’s broader Estates Strategy","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Concordis joined the GMPP, separate to the NCA Portfolio, from Q1 2025/26 due to the size, complexity and delivery status of the Programme. The delivery confidence has remained at Amber from Q1 to Q4 taking in to account that successful delivery of the programme to time, cost and quality appears feasible. Significant issues have emerged requiring management attention. These were resolvable and addressed promptly, so as not to present a cost/schedule overrun.","startDate":null,"endDate":null,"scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same. This is primarily due to managed governance models, strong RAID management and a comprehensive integrated plan.","fyBaseline":53.58,"fyForecast":53.58,"fyVariance":0.0,"varianceNarrative":"The budget variance for FY 2025/26 is less than 5%","wholeLifeCost":189.75,"costNarrative":"Concordis whole Life Cost of 189.95m remained the same during the FY period 2025/26.","benefits":120.62,"benefitsNarrative":"Concordis monetised benefits of 149.30m remained the same during the FY period 2025/26.","themes":["Cost & funding","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Concordis joined the GMPP, separate to the NCA Portfolio, from Q1 2025/26 due to the size, complexity and delivery status of the Programme. The delivery confidence has remained at Amber from Q1 to Q4 taking in to account that successful delivery of the programme to time, cost and quality appears feasible. Significant issues have emerged requiring management…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same. This is primarily due to managed governance models, strong RAID management and a comprehensive integrated plan.","narrativeClaimKind":null}],"previous":null,"ratingDelta":null,"transition":"Not comparable","endDateDeltaDays":null,"attentionScore":18,"attentionReasons":["Current published delivery confidence is Amber"]},{"id":"DLUHC_0181_2223-Q3","year":2026,"name":"DIGITAL PLANNING PROGRAMME","department":"MHCLG","category":"Government Transformation and Service Delivery","description":"The planning system should deliver the development that communities need and ensure that places are liveable and sustainable. Communities should trust the planning system and be sure they have the ability to engage with what gets built where. The system needs to be faster, more efficient and more certain, making local and national planning policies clearer to citizens, communities, and developers, and enabling effective consultation with affected communities. The MHCLG Digital Planning Programme will enable a modern and efficient 21st century planning system. The programme’s four key interventions (focused on better access to planning data, faster and more efficient planning decisions, improved local community engagement and, simpler, faster, more accessible plan making) will shift a semi analogue system based on documents to one that is data-driven, standards based and powered by modern user centred products and services. The programme is progressing the development and rollout of AI-enabled planning tools to support the shift from document-based processes to a digital, interoperable planning system. This includes Extract, which converts historic planning documents and maps into standardised, usable data, and Augmented Planning Decisions, which uses this data to enable faster, more consistent decision-making—initially targeting a significant reduction in processing times for householder applications.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. The NISTA Gateway Review took place in February 2026, assessing the programme’s readiness for the next phase of delivery. The review team were complimentary of the programme recognising improved delivery maturity within a complex and evolving environment. This resulted in an Amber delivery confidence rating, reflecting progress alongside the inherent challenges of scaling delivery nationally. The programme has prioritised activity to address the 12 Gateway recommendations which were focused around integrated planning, adoption, governance. A central priority is developing an integrated, outcome-focused plan that aligns dependencies, milestones and benefits across policy and delivery; this underpins several other recommendations. Key delivery risks are being managed through closer collaboration with partners and more targeted engagement with local authorities to support adoption. Governance is evolving to place emphasis on business change and operational delivery, with broader stakeholder involvement to strengthen ownership, accountability and benefits realisation.","startDate":"2020-09-01","endDate":null,"scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 increased from 30/03/2027 to 29/03/2030. This reflects an updated business case agreed at the recent spending review which sets out plans to scale digital transformation of the planning system, moving from pilots to widespread adoption. Key plans include scaling the Planning Data Platform, mandating data standards, enabling national data sharing and AI use, and shifting towards market intervention so suppliers meet a modern software definition. By 2030, the aim is a faster, data-driven system delivering productivity gains, better decisions, which will enable the delivery of 1.5 million homes.","fyBaseline":23.73,"fyForecast":23.73,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":218.54,"costNarrative":"The WLC has increased by £71m, reflecting increases from Spending Review Phase 2 and adjustments for inflation in real terms.","benefits":169.15,"benefitsNarrative":"The programme’s benefits combine cash and non-cash impacts from improved access to planning data and modern software, enabling faster decisions, more efficient processes, and better digital engagement. These align to Financial Year 25/26 outcomes, including quicker planning decisions, more transparent plan-making, and improved infrastructure delivery. The main cashable benefits include savings from digital citizen engagement tools; licence fee savings through adoption of the programme’s development management software; and reduced costs to local planning authorities in preparing local plans using digital plan making tools. In addition, the programme delivers non-cash benefits including reduced administrative burden for local authorities, improved accessibility of planning information, and greater consistency in decision-making, contributing to a more predictable and responsive planning system.","themes":["Delivery & schedule","Governance & assurance","Technical & integration","Approvals & decisions"],"evidenceExcerpt":"The SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. The NISTA Gateway Review took place in February 2026, assessing the programme’s readiness for the next phase of delivery. The review team were complimentary of the programme recognising improved delivery maturity within a complex and evolving environment. This resulted in an…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 increased from 30/03/2027 to 29/03/2030. This reflects an updated business case agreed at the recent spending review which sets out plans to scale digital transformation of the planning system, moving from pilots to widespread adoption. Key plans include scaling the Planning Data Platform, mandating data standards, enabling national data sharing and AI use, and shifting towards market intervention so suppliers meet a modern software definition. By 2030, the aim is a faster, data-driven system delivering productivity gains, better decisions, which will enable the delivery of 1.5 million homes.","narrativeClaimKind":null,"history":[{"id":"DLUHC_0181_2223-Q3","year":2023,"name":"Digital Planning Programme","department":"DLUHC","category":"Government Transformation and Service Delivery","description":"The planning system should deliver the things that communities need, making places liveable, sustainable, and beautiful. Communities should trust the planning system and have the ability to engage with what gets built, where. The system needs to be faster, more efficient and more certain, making it clearer to citizens, communities, and developers what the rules and permissions are, and enable a better conversation about the inherent trade-offs involved in deciding what land is allocated and what is built. The Digital Planning Programme will enable a modern and efficient 21st century planning system. The programmes four key interventions will shift a semi analogue system, based on documents, to one that is data-driven, standards based, and powered by modern user centred products and services.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 is Amber. This is primarily due to the following factors. The Infrastructure and Projects Authority (IPA) Gateway 2 review took place in September 2022 and resulted in the disaggregation of the planning reform programme. Digital Planning was classified as a GMPP programme in its own right. The Digital Planning Programme was given an amber delivery confidence rating, with the review team endorsing a portfolio approach to the planning reforms. In response to the IPA recommendations and Accounting Officer (AO) assurance review, which took place in October 2022, the programme developed an action plan to take forward the recommendations, with a particular focus on the digital planning adoption strategy. The immediate priorities for the programme remain focussed around adoption, and the delivery of legislation (planning data clauses in the Levelling Up and Regeneration Bill). Both remain on track.","startDate":"2020-09-01","endDate":"2027-12-31","scheduleNarrative":"The project's end-date at 22/23-Q4 is 2027-12-31. This is primarily due to the following factors. The programme's end-date at 22/23-Q4 is Q3 2027. This is primarily due to the overall implementation of planning reform and legislation. We expect Royal Assent of the Levelling Up and Regeneration Bill to be reached later this year. Thereafter, there will be a period for secondary legislation and regulations to be laid. There will be a transition period where new style local plans are delivered and adopted.","fyBaseline":21.8,"fyForecast":19.8,"fyVariance":-9.0,"varianceNarrative":"Delays to awarding technical support contracts delayed spending in FY22/23 by several months (-2.3m). Part of this underspend (+0.3m) was utilised by providing additional support to Local Planning Authorities for digital citizen engagement projects.","wholeLifeCost":150.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 22/23-Q4 is 150m. This is primarily due to the following factors. The Digital Planning Programme whole life costs cover funding for planning software adoption and development by Local Planning Authorities, and the technical support provided by delivery partners for development and hosting of a planning data platform. Additionally, this includes costs for the adoption of digital local plans.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. The project's departmental-agree monetised benefits at 22/23-Q4 is 0m. Since the last year, the Digital Planning Programme has separated from wider planning reform. The forecast benefits now reflect the cash-releasing benefits from better data availability and accessibility, leading to cost savings incurred from producing a digital local plan, as well as non-cash-releasing benefits from software development reducing inefficiencies and, thus, time (in terms of hours spent processing and validating planning applications). These benefits were estimated using evidence from digital planning pilots. Further monetisable benefits, such as those for digital citizen engagement, will be identified through the monitoring and evaluation of the programme.","themes":["Technical & integration","Cost & funding","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 is Amber. This is primarily due to the following factors. The Infrastructure and Projects Authority (IPA) Gateway 2 review took place in September 2022 and resulted in the disaggregation of the planning reform programme. Digital Planning was classified as a GMPP…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 22/23-Q4 is 2027-12-31. This is primarily due to the following factors. The programme's end-date at 22/23-Q4 is Q3 2027. This is primarily due to the overall implementation of planning reform and legislation. We expect Royal Assent of the Levelling Up and Regeneration Bill to be reached later this year. Thereafter, there will be a period for secondary legislation and regulations to be laid. There will be a transition period where new style local plans are delivered and adopted.","narrativeClaimKind":null},{"id":"DLUHC_0181_2223-Q3","year":2024,"name":"Digital Planning Programme","department":"DLUHC","category":"Government Transformation and Service Delivery","description":"The Digital Planning Programme will enable a modern and efficient 21st century planning system.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. As at March 24: We continue to assess the delivery confidence of the programme as amber. _x000D_ _x000D_ The programme continued to focus on IPA recommendations relating to programme wide adoption, engagement and innovation strategies.","startDate":"2020-09-01","endDate":"2027-03-30","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 decreased from 2027-12-31 to 2027-03-30. This is primarily due to the following factors. As at March 24: The project's end-date is March 2027. This has changed to align with the agreed funding period.","fyBaseline":31.05,"fyForecast":31.9,"fyVariance":3.0,"varianceNarrative":"The budget variance is inferior or equal to 5%.","wholeLifeCost":151.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 increased from 150m. to 151m. This is primarily due to the following factors. Project Baseline Whole Life Cost remians at 150.01 (m) as reoported in 22-23. WLC included expected programme budget to continue delivery beyond the spending review period (25-26 and beyond). _x000D_ _x000D_ Future year funding adjusted to reflect increased focus on software adoption and development (largest proportion of the digital planning budget) to better align budget with programme delivery plans. 17.9m of 24-25 budget is allocated to for LPAs to deliver software adoption. _x000D_ _x000D_ Programme optimism bias has been reallocated to fund increased workforce and PropTech adoption work.","benefits":232.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 232m. Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 2324-Q4 increased from 0m to 232m.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. As at March 24: We continue to assess the delivery confidence of the programme as amber. _x000D_ _x000D_ The programme continued to focus on IPA recommendations…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 decreased from 2027-12-31 to 2027-03-30. This is primarily due to the following factors. As at March 24: The project's end-date is March 2027. This has changed to align with the agreed funding period.","narrativeClaimKind":null},{"id":"DLUHC_0181_2223-Q3","year":2025,"name":"DIGITAL PLANNING PROGRAMME","department":"MHCLG","category":"Government Transformation and Service Delivery","description":"The planning system should deliver the development that communities need and ensure that places are liveable and sustainable. Communities should trust the planning system and be sure they have the ability to engage with what gets built where. The system needs to be faster, more efficient and more certain, making local and national planning policies clearer to citizens, communities, and developers, and enabling effective consultation with affected communities. The MHCLG Digital Planning Programme will enable a modern and efficient 21st century planning system. The programme’s four key interventions (focused around better access to planning data, faster and more efficient planning decisions, improved local community engagement and, simpler, faster, more accessible plan making) will shift a semi analogue system based on documents to one that is data-driven, standards based and powered by modern user centred products and services.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The latest IPA gateway 0 (3) review took place in October 2024 with the programme given an Amber rating, with narrative from the review team showing that we are maintaining good progress. The immediate priorities include: developing clear criteria and SMART measures to ensure successful delivery against revised targets for the current Spending Review period that can be evidenced. Ability to easily monitor the status of all Local Planning Authorities (LPAs) as they implement and adopt modern planning software. Revision of the Strategic Business Case to align with the Spending Review and reviewing the benefits strategy and plans to reflect the current state of the programme.","startDate":"2020-09-01","endDate":"2027-03-30","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained 30/03/2027. This is primarily due to the following factors: There has been no change to the schedule for the programme.","fyBaseline":37.13,"fyForecast":31.09,"fyVariance":16.27,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors: The underspend reflects a successful initiative to decrease spending on bench contracts held with our delivery partners, complemented by a greater emphasis on civil service recruitment. Further underspend is due to reduced scope of activities across the programme.","wholeLifeCost":148.34,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 106 to 148. This is primarily due to the following factors: Previous WLC did not include costs beyond Spending Review period which ended in 24/25. Therefore, WLC cost increase will continue to fund existing activities to be delivered in future Spending Review periods. These additional costs include workforce, maintenance and system support as well as product development which are necessary to ensure continued progress and successful completion of the programme’s objectives. We expect WLC to increase by the end of Financial Year 25/26, as the next phase of Spending Review is finalised.","benefits":184.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) decreased from 232 to 184. This is primarily due to the following factors: Projected programme benefits have been revised downward due to slower-than-expected adoption of digital tools by Local Planning Authorities (LPA), reflecting points we have learned since beginning the programme about the relationships with incumbent suppliers and the level of Local Authority capacity for adoption. Ongoing end-to-end testing with selected LPAs may identify further efficiencies for inclusion in future benefit assessments. Also, there has been an increase in inflation, compared to when the benefits were originally forecast.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The latest IPA gateway 0 (3) review took place in October 2024 with the programme given an Amber rating, with narrative from the review team showing that we are…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained 30/03/2027. This is primarily due to the following factors: There has been no change to the schedule for the programme.","narrativeClaimKind":null},{"id":"DLUHC_0181_2223-Q3","year":2026,"name":"DIGITAL PLANNING PROGRAMME","department":"MHCLG","category":"Government Transformation and Service Delivery","description":"The planning system should deliver the development that communities need and ensure that places are liveable and sustainable. Communities should trust the planning system and be sure they have the ability to engage with what gets built where. The system needs to be faster, more efficient and more certain, making local and national planning policies clearer to citizens, communities, and developers, and enabling effective consultation with affected communities. The MHCLG Digital Planning Programme will enable a modern and efficient 21st century planning system. The programme’s four key interventions (focused on better access to planning data, faster and more efficient planning decisions, improved local community engagement and, simpler, faster, more accessible plan making) will shift a semi analogue system based on documents to one that is data-driven, standards based and powered by modern user centred products and services. The programme is progressing the development and rollout of AI-enabled planning tools to support the shift from document-based processes to a digital, interoperable planning system. This includes Extract, which converts historic planning documents and maps into standardised, usable data, and Augmented Planning Decisions, which uses this data to enable faster, more consistent decision-making—initially targeting a significant reduction in processing times for householder applications.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. The NISTA Gateway Review took place in February 2026, assessing the programme’s readiness for the next phase of delivery. The review team were complimentary of the programme recognising improved delivery maturity within a complex and evolving environment. This resulted in an Amber delivery confidence rating, reflecting progress alongside the inherent challenges of scaling delivery nationally. The programme has prioritised activity to address the 12 Gateway recommendations which were focused around integrated planning, adoption, governance. A central priority is developing an integrated, outcome-focused plan that aligns dependencies, milestones and benefits across policy and delivery; this underpins several other recommendations. Key delivery risks are being managed through closer collaboration with partners and more targeted engagement with local authorities to support adoption. Governance is evolving to place emphasis on business change and operational delivery, with broader stakeholder involvement to strengthen ownership, accountability and benefits realisation.","startDate":"2020-09-01","endDate":null,"scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 increased from 30/03/2027 to 29/03/2030. This reflects an updated business case agreed at the recent spending review which sets out plans to scale digital transformation of the planning system, moving from pilots to widespread adoption. Key plans include scaling the Planning Data Platform, mandating data standards, enabling national data sharing and AI use, and shifting towards market intervention so suppliers meet a modern software definition. By 2030, the aim is a faster, data-driven system delivering productivity gains, better decisions, which will enable the delivery of 1.5 million homes.","fyBaseline":23.73,"fyForecast":23.73,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":218.54,"costNarrative":"The WLC has increased by £71m, reflecting increases from Spending Review Phase 2 and adjustments for inflation in real terms.","benefits":169.15,"benefitsNarrative":"The programme’s benefits combine cash and non-cash impacts from improved access to planning data and modern software, enabling faster decisions, more efficient processes, and better digital engagement. These align to Financial Year 25/26 outcomes, including quicker planning decisions, more transparent plan-making, and improved infrastructure delivery. The main cashable benefits include savings from digital citizen engagement tools; licence fee savings through adoption of the programme’s development management software; and reduced costs to local planning authorities in preparing local plans using digital plan making tools. In addition, the programme delivers non-cash benefits including reduced administrative burden for local authorities, improved accessibility of planning information, and greater consistency in decision-making, contributing to a more predictable and responsive planning system.","themes":["Delivery & schedule","Governance & assurance","Technical & integration","Approvals & decisions"],"evidenceExcerpt":"The SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. The NISTA Gateway Review took place in February 2026, assessing the programme’s readiness for the next phase of delivery. The review team were complimentary of the programme recognising improved delivery maturity within a complex and evolving environment. This resulted in an…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 increased from 30/03/2027 to 29/03/2030. This reflects an updated business case agreed at the recent spending review which sets out plans to scale digital transformation of the planning system, moving from pilots to widespread adoption. Key plans include scaling the Planning Data Platform, mandating data standards, enabling national data sharing and AI use, and shifting towards market intervention so suppliers meet a modern software definition. By 2030, the aim is a faster, data-driven system delivering productivity gains, better decisions, which will enable the delivery of 1.5 million homes.","narrativeClaimKind":null}],"previous":{"id":"DLUHC_0181_2223-Q3","year":2025,"name":"DIGITAL PLANNING PROGRAMME","department":"MHCLG","category":"Government Transformation and Service Delivery","description":"The planning system should deliver the development that communities need and ensure that places are liveable and sustainable. Communities should trust the planning system and be sure they have the ability to engage with what gets built where. The system needs to be faster, more efficient and more certain, making local and national planning policies clearer to citizens, communities, and developers, and enabling effective consultation with affected communities. The MHCLG Digital Planning Programme will enable a modern and efficient 21st century planning system. The programme’s four key interventions (focused around better access to planning data, faster and more efficient planning decisions, improved local community engagement and, simpler, faster, more accessible plan making) will shift a semi analogue system based on documents to one that is data-driven, standards based and powered by modern user centred products and services.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The latest IPA gateway 0 (3) review took place in October 2024 with the programme given an Amber rating, with narrative from the review team showing that we are maintaining good progress. The immediate priorities include: developing clear criteria and SMART measures to ensure successful delivery against revised targets for the current Spending Review period that can be evidenced. Ability to easily monitor the status of all Local Planning Authorities (LPAs) as they implement and adopt modern planning software. Revision of the Strategic Business Case to align with the Spending Review and reviewing the benefits strategy and plans to reflect the current state of the programme.","startDate":"2020-09-01","endDate":"2027-03-30","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained 30/03/2027. This is primarily due to the following factors: There has been no change to the schedule for the programme.","fyBaseline":37.13,"fyForecast":31.09,"fyVariance":16.27,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors: The underspend reflects a successful initiative to decrease spending on bench contracts held with our delivery partners, complemented by a greater emphasis on civil service recruitment. Further underspend is due to reduced scope of activities across the programme.","wholeLifeCost":148.34,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 106 to 148. This is primarily due to the following factors: Previous WLC did not include costs beyond Spending Review period which ended in 24/25. Therefore, WLC cost increase will continue to fund existing activities to be delivered in future Spending Review periods. These additional costs include workforce, maintenance and system support as well as product development which are necessary to ensure continued progress and successful completion of the programme’s objectives. We expect WLC to increase by the end of Financial Year 25/26, as the next phase of Spending Review is finalised.","benefits":184.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) decreased from 232 to 184. This is primarily due to the following factors: Projected programme benefits have been revised downward due to slower-than-expected adoption of digital tools by Local Planning Authorities (LPA), reflecting points we have learned since beginning the programme about the relationships with incumbent suppliers and the level of Local Authority capacity for adoption. Ongoing end-to-end testing with selected LPAs may identify further efficiencies for inclusion in future benefit assessments. Also, there has been an increase in inflation, compared to when the benefits were originally forecast.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The latest IPA gateway 0 (3) review took place in October 2024 with the programme given an Amber rating, with narrative from the review team showing that we are…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained 30/03/2027. This is primarily due to the following factors: There has been no change to the schedule for the programme.","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":null,"attentionScore":18,"attentionReasons":["Current published delivery confidence is Amber"]},{"id":"DCMS_0321_2324-Q3","year":2026,"name":"EURO 2028","department":"DCMS","category":"Government Transformation and Service Delivery","description":"In 2028 the UK & Ireland will host the men's UEFA European Championships. This will be the biggest sporting event the UK and Ireland have ever jointly hosted.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA Delivery Confidence Assessment (DCA) rating at 25/26 remained at Amber. This is primarily because we remain confident of delivery on time and within budget, in line with our most recent NISTA-commissioned Gate Review. Following the transition into the delivery phase in April 2025, UK&Ireland 2028 Ltd has become well established in its role coordinating and delivering domestic partners' tournament hosting responsibilities. The programme has updated its Full Business Case (with refreshed costs and estimated benefits) and a successful tournament launch event took place in November 2025, where the UK Government contribution of up to £557m was announced.","startDate":"2023-10-11","endDate":null,"scheduleNarrative":"Compared to financial year 24/25 Q4, the project's end-date at 25/26 Q4 has increased from last year's published end date to this year's published end date of 31/03/2031. This is because the EURO 2028 tournament will take place from June to July 2028, and the evaluation of the programme (including its legacy and impact 'community programme') is expected to conclude by 31 March 2031.","fyBaseline":4.73,"fyForecast":4.82,"fyVariance":2.05,"varianceNarrative":"The budget variance is less than or equal to 5% post budget exchange at the Supplementary Estimates","wholeLifeCost":511.63,"costNarrative":"The project's departmentally agreed Whole Life Cost at 25/26 Q4 (measured in £m) is up to 557. This represents the total estimated UK Government contribution to plan and deliver the hosting responsibilities for the UEFA EURO 2028 Tournament. This has remained the same compared to last year's whole life cost, but has since been publically communicated for the first time. Please note figures referenced in the narratives were entered as nominal and the system automatically converts them to Real Terms.","benefits":3089.89,"benefitsNarrative":"Compared to financial year 24/25 Q4, the project's departmentally agreed benefits at 25/26-Q4 (measured in £m) increased from 2362 to 3200 (3600 including Ireland), This is primarily because the programme commissioned an updated socio-economic analysis, which is reflected in this updated estimate.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA Delivery Confidence Assessment (DCA) rating at 25/26 remained at Amber. This is primarily because we remain confident of delivery on time and within budget, in line with our most recent NISTA-commissioned Gate Review. Following the transition into the delivery phase in April 2025, UK&Ireland 2028 Ltd has become…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25 Q4, the project's end-date at 25/26 Q4 has increased from last year's published end date to this year's published end date of 31/03/2031. This is because the EURO 2028 tournament will take place from June to July 2028, and the evaluation of the programme (including its legacy and impact 'community programme') is expected to conclude by 31 March 2031.","narrativeClaimKind":null,"history":[{"id":"DCMS_0321_2324-Q3","year":2024,"name":"UEFA EURO 2028","department":"DCMS","category":"Government Transformation and Service Delivery","description":"On 10 October, UEFA officially announced the UK and Ireland as the hosts of the 2028 men's European Championships. It will be the biggest sporting event the UK and Ireland have jointly hosted. The UEFA European Championships (EUROs) are globally the second largest football tournament. They are held every four years and last fully hosted in the UK (England) in 1996.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure and Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. The UK and Ireland were officially announced as the hosts of UEFA EURO 2028 in October 2023. The tournament will be delivered primarily by football partners (UEFA and the five Football Associations), working together with government partners across the UK and Ireland. The programme is now in a transition phase (October 2023 - December 2024), with a focus on putting in place firm foundations for tournament delivery. Successful delivery of the tournament is dependent on a range of public and private partners across the UK and Ireland. Robust governance, programme management and assurance measures are being put in place to coordinate delivery and ensure value for money. The tournament is largely reliant on existing stadium, transport and accommodation infrastructure. The hosting of matches at Casement Park in Northern Ireland is dependent on a separate project led by the Northern Ireland Executive.","startDate":"2023-10-11","endDate":"2030-03-31","scheduleNarrative":"The project's end-date at 23/24-Q4 is 2030-03-31. This is primarily due to the following factors. EURO 2028 will be delivered in June/July 2028. The evaluation of the programme is expected to conclude by 31 March 2030.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 22 of the Freedom of Information Act 2000 (Information intended for future publication)","wholeLifeCost":null,"costNarrative":"Exempt under Section 22 of the Freedom of Information Act 2000 (Information intended for future publication)","benefits":2362.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 2362m.","themes":["Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"The Infrastructure and Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. The UK and Ireland were officially announced as the hosts of UEFA EURO 2028 in October 2023. The tournament will be delivered primarily by football partners (UEFA and the five Football Associations), working…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 23/24-Q4 is 2030-03-31. This is primarily due to the following factors. EURO 2028 will be delivered in June/July 2028. The evaluation of the programme is expected to conclude by 31 March 2030.","narrativeClaimKind":null},{"id":"DCMS_0321_2324-Q3","year":2025,"name":"EURO 2028","department":"DCMS","category":"Government Transformation and Service Delivery","description":"In 2028 the UK & Ireland will host the men's UEFA European Championships. This will be the biggest sporting event the UK and Ireland have ever jointly hosted.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ We remain confident of delivery on time and within budget. After the UK and Ireland won the rights to host EURO 2028 in October 2023, the programme subsequently moved into the Transition Phase, during which the partnership put in place firm foundations for delivery. This included the completion of a key milestone - the launch in March 2025 of UK and Ireland 2028 Ltd, the private company established by the football associations to coordinate domestic partners’ tournament hosting responsibilities. The programme has now moved into the Delivery Phase, from April 2025.","startDate":"2023-10-10","endDate":"2030-03-31","scheduleNarrative":"The project's end-date at 24/25-Q4 is scheduled to be 31/03/2030. This is primarily due to the following factors, EURO 2028 will be delivered in June/July 2028. The evaluation of the programme is expected to conclude by 31 March 2030.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 22 - Information intended for future publication","wholeLifeCost":null,"costNarrative":"Section 22 - Information intended for future publication","benefits":2362.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at up to 2362. This is primarily due to the following factors‚ As at 31/03/2025 there has been no change in estimated socio economic benefit for the tournament.","themes":["Delivery & schedule","Cost & funding"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ We remain confident of delivery on time and within budget. After the UK and Ireland won the rights to host EURO 2028 in October 2023, the programme subsequently moved…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 24/25-Q4 is scheduled to be 31/03/2030. This is primarily due to the following factors, EURO 2028 will be delivered in June/July 2028. The evaluation of the programme is expected to conclude by 31 March 2030.","narrativeClaimKind":null},{"id":"DCMS_0321_2324-Q3","year":2026,"name":"EURO 2028","department":"DCMS","category":"Government Transformation and Service Delivery","description":"In 2028 the UK & Ireland will host the men's UEFA European Championships. This will be the biggest sporting event the UK and Ireland have ever jointly hosted.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA Delivery Confidence Assessment (DCA) rating at 25/26 remained at Amber. This is primarily because we remain confident of delivery on time and within budget, in line with our most recent NISTA-commissioned Gate Review. Following the transition into the delivery phase in April 2025, UK&Ireland 2028 Ltd has become well established in its role coordinating and delivering domestic partners' tournament hosting responsibilities. The programme has updated its Full Business Case (with refreshed costs and estimated benefits) and a successful tournament launch event took place in November 2025, where the UK Government contribution of up to £557m was announced.","startDate":"2023-10-11","endDate":null,"scheduleNarrative":"Compared to financial year 24/25 Q4, the project's end-date at 25/26 Q4 has increased from last year's published end date to this year's published end date of 31/03/2031. This is because the EURO 2028 tournament will take place from June to July 2028, and the evaluation of the programme (including its legacy and impact 'community programme') is expected to conclude by 31 March 2031.","fyBaseline":4.73,"fyForecast":4.82,"fyVariance":2.05,"varianceNarrative":"The budget variance is less than or equal to 5% post budget exchange at the Supplementary Estimates","wholeLifeCost":511.63,"costNarrative":"The project's departmentally agreed Whole Life Cost at 25/26 Q4 (measured in £m) is up to 557. This represents the total estimated UK Government contribution to plan and deliver the hosting responsibilities for the UEFA EURO 2028 Tournament. This has remained the same compared to last year's whole life cost, but has since been publically communicated for the first time. Please note figures referenced in the narratives were entered as nominal and the system automatically converts them to Real Terms.","benefits":3089.89,"benefitsNarrative":"Compared to financial year 24/25 Q4, the project's departmentally agreed benefits at 25/26-Q4 (measured in £m) increased from 2362 to 3200 (3600 including Ireland), This is primarily because the programme commissioned an updated socio-economic analysis, which is reflected in this updated estimate.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA Delivery Confidence Assessment (DCA) rating at 25/26 remained at Amber. This is primarily because we remain confident of delivery on time and within budget, in line with our most recent NISTA-commissioned Gate Review. Following the transition into the delivery phase in April 2025, UK&Ireland 2028 Ltd has become…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25 Q4, the project's end-date at 25/26 Q4 has increased from last year's published end date to this year's published end date of 31/03/2031. This is because the EURO 2028 tournament will take place from June to July 2028, and the evaluation of the programme (including its legacy and impact 'community programme') is expected to conclude by 31 March 2031.","narrativeClaimKind":null}],"previous":{"id":"DCMS_0321_2324-Q3","year":2025,"name":"EURO 2028","department":"DCMS","category":"Government Transformation and Service Delivery","description":"In 2028 the UK & Ireland will host the men's UEFA European Championships. This will be the biggest sporting event the UK and Ireland have ever jointly hosted.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ We remain confident of delivery on time and within budget. After the UK and Ireland won the rights to host EURO 2028 in October 2023, the programme subsequently moved into the Transition Phase, during which the partnership put in place firm foundations for delivery. This included the completion of a key milestone - the launch in March 2025 of UK and Ireland 2028 Ltd, the private company established by the football associations to coordinate domestic partners’ tournament hosting responsibilities. The programme has now moved into the Delivery Phase, from April 2025.","startDate":"2023-10-10","endDate":"2030-03-31","scheduleNarrative":"The project's end-date at 24/25-Q4 is scheduled to be 31/03/2030. This is primarily due to the following factors, EURO 2028 will be delivered in June/July 2028. The evaluation of the programme is expected to conclude by 31 March 2030.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 22 - Information intended for future publication","wholeLifeCost":null,"costNarrative":"Section 22 - Information intended for future publication","benefits":2362.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at up to 2362. This is primarily due to the following factors‚ As at 31/03/2025 there has been no change in estimated socio economic benefit for the tournament.","themes":["Delivery & schedule","Cost & funding"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ We remain confident of delivery on time and within budget. After the UK and Ireland won the rights to host EURO 2028 in October 2023, the programme subsequently moved…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 24/25-Q4 is scheduled to be 31/03/2030. This is primarily due to the following factors, EURO 2028 will be delivered in June/July 2028. The evaluation of the programme is expected to conclude by 31 March 2030.","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":null,"attentionScore":18,"attentionReasons":["Current published delivery confidence is Amber"]},{"id":"DHSC_0071_2122-Q1","year":2026,"name":"FRONTLINE DIGITISATION","department":"DHSC","category":"Information and Communications Technology (ICT)","description":"The aim of the Frontline Digitisation (FD) programme is to support secondary care trusts to procure and implement an electronic patient record system (EPR) that meets our minimum standards. The ability to access up-to-date patient medical records at any time increases safety, improves outcomes and provides productivity benefits compared with paper records. Investment in digitising the frontline will ensure health and care staff have access to health-related information when and where it is needed, supporting them to deliver care efficiently, effectively and safely, reducing variation and improving outcomes. The delivery outcomes of the programme are: • Coverage – supporting trusts without an EPR to implement one – target 96% by March 26. • Capability – supporting trusts with an EPR to replace, extend or optimise it to meet our minimum standards – target 70% by March 26. • Convergence – making decisions about coverage and capability with the aim of having fewer, more integrated EPRs serving larger populations.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 improved from Amber to this year’s AMBER / GREEN rating. This is primarily due to the Programme having made very significant progress in increasing EPR Coverage and Digital Maturity across NHS Trusts. This is a key strategic capability uplift across the health ecosystem and this level of progress against a changing and unusually challenging delivery context was commended.","startDate":"2021-04-01","endDate":"2026-03-31","scheduleNarrative":"Compared to Financial Year 24/25 Q4, the project's end date at 25/26 Q4 remained the same with the programme closure taking place on 31st March 2026. The programme has completed with 94% coverage against a target of 96% however, all contracts have been signed with suppliers. The final capability is 73% against a target of 70%, reaching 78% by end of Quarter One 26/27 with no additional interventions.","fyBaseline":567.61,"fyForecast":552.77,"fyVariance":2.61,"varianceNarrative":"The programme variance was under 5%.","wholeLifeCost":2080.52,"costNarrative":"The Programme's departmentally agreed WLC remained unchanged from the 24/25 agreed WLC.","benefits":12131.07,"benefitsNarrative":"Compared to financial year 24/25, the project's departmentally agreed Benefits at 25/26 remains the same.","themes":["Delivery & schedule","Cost & funding","Workforce & capability","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 improved from Amber to this year’s AMBER / GREEN rating. This is primarily due to the Programme having made very significant progress in increasing EPR Coverage and Digital Maturity across NHS Trusts. This is a key strategic capability uplift across the…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to Financial Year 24/25 Q4, the project's end date at 25/26 Q4 remained the same with the programme closure taking place on 31st March 2026. The programme has completed with 94% coverage against a target of 96% however, all contracts have been signed with suppliers. The final capability is 73% against a target of 70%, reaching 78% by end of Quarter One 26/27 with no additional interventions.","narrativeClaimKind":null,"history":[{"id":"DHSC_0071_2122-Q1","year":2022,"name":"Frontline Digitisation","department":"DHSC","category":"ICT","description":"Our vision is a digitally-enabled health and care system, where the health service and its users have the digital services and access to the data they need to effectively manage and improve health and wellbeing. The Frontline Digitisation programme will support this vision by levelling up ICS and providers to a baseline level of digital capability, set out in our Minimum Digital Foundations, which will enable frontline clinical and operational staff to make best use of digital technology to deliver care efficiently, effectively and safely, reducing variations and improving quality and outcomes.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 is Amber Our programme is on schedule and should hopefully move to green once: Our Programme Business Case has been approved by HMT in June 22. We have fully resourced the programme team, an adequate support offer is in place and suitable proportionate assurance framework in place to help organisations succeed in meeting Minimum Digital Foundations standards. We can progress with this at pace once the PBC has been approved. We have confidence in ICS' plans to deliver the Minimum Digital Foundations by March 2025 and these are currently being reviewed. We will work with NHSEI Regions and ICS to support this.","startDate":"2021-04-01","endDate":"2025-03-31","scheduleNarrative":"Your project end-date is 31 MAR 2025. This is primarily due to the following factors: Our plan is on schedule providing we get the PBC approved by HMT in Jun 22. SR settlement had been agreed and funding profiled accordingly in the PBC","fyBaseline":320.0,"fyForecast":320.0,"fyVariance":0.0,"varianceNarrative":"The final 21/22 FD Underspend is £11m and represents only a 3.5% underspend against the £321.8m FD Budget","wholeLifeCost":2610.0,"costNarrative":"Your projects Baseline Whole Life Cost is 2610.00 (£m). This is primarily due to the following factors: The whole life costs of the programme is £2,045m. This was our SR settlement award.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Technical & integration","Approvals & decisions"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 is Amber Our programme is on schedule and should hopefully move to green once: Our Programme Business Case has been approved by HMT in June 22. We have fully resourced the programme team, an adequate support offer is in place and suitable proportionate assurance…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Your project end-date is 31 MAR 2025. This is primarily due to the following factors: Our plan is on schedule providing we get the PBC approved by HMT in Jun 22. SR settlement had been agreed and funding profiled accordingly in the PBC","narrativeClaimKind":null},{"id":"DHSC_0071_2122-Q1","year":2023,"name":"Frontline Digitisation","department":"DHSC","category":"ICT","description":"Our vision is a digitised health and care system where the health service and its users have the digital services and access to information they need to effectively manage and improve health and wellbeing. We are levelling up healthcare systems and providers to a baseline level of core digital capability, as set out in What Good Looks Like, which enables frontline clinical staff to make best use of digital technology to deliver care efficiently, effectively and safely, reducing variations, and improving quality and outcomes","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 decreased from Amber to Red. This is primarily due to the following factors. Delivery confidence is red as a number of NHS trusts are reporting they are unlikely to be able to fully implement an Electronic Patient Record by March 2025. The Frontline Digitisation programme team is supporting each of these trusts to deliver as quickly as possible while maintaining the highest standards of patient care.","startDate":"2021-04-01","endDate":"2025-03-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2025-03-31. This is primarily due to the following factors. A revised business case to reflect a new programme end date of March 2026 in being prepared. The programme continues to work to the existing cost parameters, with budget being reprofiled to cover the additional year to March 2026, to ensure financial support is available when needed for trusts who are unable to deliver by March 2025.","fyBaseline":474.9,"fyForecast":474.9,"fyVariance":0.0,"varianceNarrative":"The GMPP project did not provide data","wholeLifeCost":1982.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 decreased from 2610m. to 1982m. This is primarily due to the following factors. FD Programme budget being reduced to support other NHS England priorities.","benefits":29814.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 29814m. The project's departmental-agree monetised benefits at 22/23-Q4 is 29814m.The project's departmental-agree monetised benefits at 22/23-Q4 is 29814m.The project's departmental-agree monetised benefits at 22/23-Q4 is 29814m. Benefits will be realised through local projects via FD programme investment. Systems and trusts undertaking these projects will be expected to undertake local 'As Is' and 'To Be' mapping to clearly articulate the expected benefits and the change management steps needed to access and realise those benefits. Investments will only be made when a project is able to demonstrate a robust return on investment with an appropriate Management approach that ensures realisation. Investment will typically occur over the life of the Programme with benefit returns modelled over 10 years. Systems and trusts will be expected to report actual benefits, referenced against forecasts stated within their business case, these returns will be aggregated to produce overall programme benefit returns.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Technical & integration"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 decreased from Amber to Red. This is primarily due to the following factors. Delivery confidence is red as a number of NHS trusts are reporting they are unlikely to be able to fully implement an Electronic Patient Record by March…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2025-03-31. This is primarily due to the following factors. A revised business case to reflect a new programme end date of March 2026 in being prepared. The programme continues to work to the existing cost parameters, with budget being reprofiled to cover the additional year to March 2026, to ensure financial support is available when needed for trusts who are unable to deliver by March 2025.","narrativeClaimKind":null},{"id":"DHSC_0071_2122-Q1","year":2024,"name":"Frontline Digitisation","department":"DHSC","category":"ICT","description":"Our vision is a digitally-enabled health and care system, where the health service and its users have the digital services and access to the data they need to effectively manage and improve health and wellbeing._x000D_ The Frontline Digitisation programme is supporting this vision by levelling up ICSs and providers to a baseline level of digital capability, set out in our Digital Capability Framework, which enables frontline clinical and operational staff to make the best use of digital technology to deliver care efficiently, effectively and safely, reducing variations and improving quality and outcomes. The EPR programme is focussed on Coverage, ensuring all trusts have an EPR, Capability, ensuring that trusts with an EPR meet our standard and Convergence, making decisions about coverage and capability with the aim of having fewer more integrated EPRs serving larger populations.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 decreased from Red to Amber. This is primarily due to the following factors. Programme delivery confidence is AMBER as agreement has been reached to extend the programme into FY25/26 to enable continued central support for trust EPR implementations in that year.","startDate":"2021-04-01","endDate":"2025-03-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2025-03-31. This is primarily due to the following factors. A revised business case to reflect the new programme end date of 31 March 2026 is in the process of being approved","fyBaseline":738.5,"fyForecast":470.8,"fyVariance":-36.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. Costs reflect the approved programme business case. An addendum with a revised funding profile is currently moving through approvals.","wholeLifeCost":1982.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 remained at 1982m. This is primarily due to the following factors. While we await sign off of the addendum, the current forecast WLC remains as set out in the approved case. This will be updated once approval has been reached to reflect the movement of funding into 25/26\"","benefits":29814.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 29814m. Benefits will be realised through local projects via FD programme investment. Systems and trusts undertaking these projects will be expected to undertake local 'As Is' and 'To Be' mapping to clearly articulate the expected benefits and the change management steps needed to access and realise those benefits. Investments will only be made when a project is able to demonstrate a robust return on investment with an appropriate Management approach that ensures realisation. Investment will typically occur over the life of the Programme with benefit returns modelled over 10 years. Systems and trusts will be expected to report actual benefits, referenced against forecasts stated within their business case, these returns will be aggregated to produce overall programme benefit returns.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 decreased from Red to Amber. This is primarily due to the following factors. Programme delivery confidence is AMBER as agreement has been reached to extend the programme into FY25/26 to enable continued central support for trust EPR…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2025-03-31. This is primarily due to the following factors. A revised business case to reflect the new programme end date of 31 March 2026 is in the process of being approved","narrativeClaimKind":null},{"id":"DHSC_0071_2122-Q1","year":2025,"name":"FRONTLINE DIGITISATION","department":"DHSC","category":"ICT","description":"The aim of the Frontline Digitisation (FD) programme is to support secondary care trusts to procure and implement an electronic patient record system (EPR) that meets our minimum standards. The ability to access up-to-date patient medical records at any time increases safety, improves outcomes and provides productivity benefits compared with paper records. Investment in digitising the frontline will ensure health and care staff have access to health-related information when and where it is needed, supporting them to deliver care efficiently, effectively and safely, reducing variation and improving outcomes. The delivery outcomes of the programme are: • Coverage – supporting trusts without an EPR to implement one – target 96% by March 26. • Capability – supporting trusts with an EPR to replace, extend or optimise it to meet our minimum standards – target 70% by March 26. • Convergence – making decisions about coverage and capability with the aim of having fewer, more integrated EPRs serving larger populations.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The Programme made significant progress in increasing EPR Coverage and Digital Maturity across NHS Trusts but there remains a changing and unusually challenging delivery context.","startDate":"2022-04-01","endDate":"2026-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2025 to 31/03/2026. This is primarily due to the following factors‚ There have been challenges with the pace at which the least digitally mature trusts have been able to move. The Programme deadline has therefore been extended from March 2025 to March 2026. The programme has been putting in place extra interventional specialist support for these trusts and we are ensuring we capture lessons learned from this cohort and respond to them.","fyBaseline":510.0,"fyForecast":469.0,"fyVariance":8.04,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ Variance between Financial Year Baseline (£510m) & Financial Year Forecast (£469m) was -£41m. Therefore, the variance between the full year Baseline & Forecast was 8%. Throughout the year the programme worked with provider organisations to manage allocations and reprioritise funding where needed. At the request of the Transformation Directorate (TD), rather than re-allocate funding from trusts unable to spend it, funds have been utilised to support the directorate’s overall position. The underspend at the end of the year was c.£10m or 2% of the overall budget. In addition, to support the wider TD position the programme reprovisioned funding back to the directorate to support wider pressures in-year, to a total value of c.£30m. This gave the final outturn position of £469m against the opening budget of £510m.","wholeLifeCost":2035.2,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 1982 to 2035. This is primarily due to the following factors‚ Total Departmental Baseline Whole Life Costs Range – (Mid) was £2,035.2m. This has increased from the previous baseline due to the provision of increased budget in 25/26 as agreed with DHSC/NHSE and set out in the PBC addendum that returns the programme to the budget level set out in the original PBC.","benefits":13208.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) decreased from 29814 to 13208. This is primarily due to the following factors The 4th addendum has resulted in a change to the original benefits forecast. There have been three main drivers to the change in benefits from the original PBC that has led to the revised BCR of 4.45:1 • The rephasing of funding into 25/26 means less benefit is realised within the 10-year economic assessment though these benefits would continue to be accrued from year 11 onwards. • Reduction in the societal benefit linked to sepsis mortality benefits being revised down following further econometric modelling. • Increase in non-cash releasing benefits linked to length of stay reduction following further econometric modelling. This has reduced the forecast benefits to £13.2bn. Within that total quantum there is an increase in overall productivity benefit arising from the reduction in length of stay.","themes":["Cost & funding","Delivery & schedule","Technical & integration"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The Programme made significant progress in increasing EPR Coverage and Digital Maturity across NHS Trusts but there remains a changing and unusually challenging…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2025 to 31/03/2026. This is primarily due to the following factors‚ There have been challenges with the pace at which the least digitally mature trusts have been able to move. The Programme deadline has therefore been extended from March 2025 to March 2026. The programme has been putting in place extra interventional specialist support for these trusts and we are ensuring we capture lessons learned from this cohort and respond to them.","narrativeClaimKind":null},{"id":"DHSC_0071_2122-Q1","year":2026,"name":"FRONTLINE DIGITISATION","department":"DHSC","category":"Information and Communications Technology (ICT)","description":"The aim of the Frontline Digitisation (FD) programme is to support secondary care trusts to procure and implement an electronic patient record system (EPR) that meets our minimum standards. The ability to access up-to-date patient medical records at any time increases safety, improves outcomes and provides productivity benefits compared with paper records. Investment in digitising the frontline will ensure health and care staff have access to health-related information when and where it is needed, supporting them to deliver care efficiently, effectively and safely, reducing variation and improving outcomes. The delivery outcomes of the programme are: • Coverage – supporting trusts without an EPR to implement one – target 96% by March 26. • Capability – supporting trusts with an EPR to replace, extend or optimise it to meet our minimum standards – target 70% by March 26. • Convergence – making decisions about coverage and capability with the aim of having fewer, more integrated EPRs serving larger populations.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 improved from Amber to this year’s AMBER / GREEN rating. This is primarily due to the Programme having made very significant progress in increasing EPR Coverage and Digital Maturity across NHS Trusts. This is a key strategic capability uplift across the health ecosystem and this level of progress against a changing and unusually challenging delivery context was commended.","startDate":"2021-04-01","endDate":"2026-03-31","scheduleNarrative":"Compared to Financial Year 24/25 Q4, the project's end date at 25/26 Q4 remained the same with the programme closure taking place on 31st March 2026. The programme has completed with 94% coverage against a target of 96% however, all contracts have been signed with suppliers. The final capability is 73% against a target of 70%, reaching 78% by end of Quarter One 26/27 with no additional interventions.","fyBaseline":567.61,"fyForecast":552.77,"fyVariance":2.61,"varianceNarrative":"The programme variance was under 5%.","wholeLifeCost":2080.52,"costNarrative":"The Programme's departmentally agreed WLC remained unchanged from the 24/25 agreed WLC.","benefits":12131.07,"benefitsNarrative":"Compared to financial year 24/25, the project's departmentally agreed Benefits at 25/26 remains the same.","themes":["Delivery & schedule","Cost & funding","Workforce & capability","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 improved from Amber to this year’s AMBER / GREEN rating. This is primarily due to the Programme having made very significant progress in increasing EPR Coverage and Digital Maturity across NHS Trusts. This is a key strategic capability uplift across the…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to Financial Year 24/25 Q4, the project's end date at 25/26 Q4 remained the same with the programme closure taking place on 31st March 2026. The programme has completed with 94% coverage against a target of 96% however, all contracts have been signed with suppliers. The final capability is 73% against a target of 70%, reaching 78% by end of Quarter One 26/27 with no additional interventions.","narrativeClaimKind":null}],"previous":{"id":"DHSC_0071_2122-Q1","year":2025,"name":"FRONTLINE DIGITISATION","department":"DHSC","category":"ICT","description":"The aim of the Frontline Digitisation (FD) programme is to support secondary care trusts to procure and implement an electronic patient record system (EPR) that meets our minimum standards. The ability to access up-to-date patient medical records at any time increases safety, improves outcomes and provides productivity benefits compared with paper records. Investment in digitising the frontline will ensure health and care staff have access to health-related information when and where it is needed, supporting them to deliver care efficiently, effectively and safely, reducing variation and improving outcomes. The delivery outcomes of the programme are: • Coverage – supporting trusts without an EPR to implement one – target 96% by March 26. • Capability – supporting trusts with an EPR to replace, extend or optimise it to meet our minimum standards – target 70% by March 26. • Convergence – making decisions about coverage and capability with the aim of having fewer, more integrated EPRs serving larger populations.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The Programme made significant progress in increasing EPR Coverage and Digital Maturity across NHS Trusts but there remains a changing and unusually challenging delivery context.","startDate":"2022-04-01","endDate":"2026-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2025 to 31/03/2026. This is primarily due to the following factors‚ There have been challenges with the pace at which the least digitally mature trusts have been able to move. The Programme deadline has therefore been extended from March 2025 to March 2026. The programme has been putting in place extra interventional specialist support for these trusts and we are ensuring we capture lessons learned from this cohort and respond to them.","fyBaseline":510.0,"fyForecast":469.0,"fyVariance":8.04,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ Variance between Financial Year Baseline (£510m) & Financial Year Forecast (£469m) was -£41m. Therefore, the variance between the full year Baseline & Forecast was 8%. Throughout the year the programme worked with provider organisations to manage allocations and reprioritise funding where needed. At the request of the Transformation Directorate (TD), rather than re-allocate funding from trusts unable to spend it, funds have been utilised to support the directorate’s overall position. The underspend at the end of the year was c.£10m or 2% of the overall budget. In addition, to support the wider TD position the programme reprovisioned funding back to the directorate to support wider pressures in-year, to a total value of c.£30m. This gave the final outturn position of £469m against the opening budget of £510m.","wholeLifeCost":2035.2,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 1982 to 2035. This is primarily due to the following factors‚ Total Departmental Baseline Whole Life Costs Range – (Mid) was £2,035.2m. This has increased from the previous baseline due to the provision of increased budget in 25/26 as agreed with DHSC/NHSE and set out in the PBC addendum that returns the programme to the budget level set out in the original PBC.","benefits":13208.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) decreased from 29814 to 13208. This is primarily due to the following factors The 4th addendum has resulted in a change to the original benefits forecast. There have been three main drivers to the change in benefits from the original PBC that has led to the revised BCR of 4.45:1 • The rephasing of funding into 25/26 means less benefit is realised within the 10-year economic assessment though these benefits would continue to be accrued from year 11 onwards. • Reduction in the societal benefit linked to sepsis mortality benefits being revised down following further econometric modelling. • Increase in non-cash releasing benefits linked to length of stay reduction following further econometric modelling. This has reduced the forecast benefits to £13.2bn. Within that total quantum there is an increase in overall productivity benefit arising from the reduction in length of stay.","themes":["Cost & funding","Delivery & schedule","Technical & integration"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The Programme made significant progress in increasing EPR Coverage and Digital Maturity across NHS Trusts but there remains a changing and unusually challenging…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2025 to 31/03/2026. This is primarily due to the following factors‚ There have been challenges with the pace at which the least digitally mature trusts have been able to move. The Programme deadline has therefore been extended from March 2025 to March 2026. The programme has been putting in place extra interventional specialist support for these trusts and we are ensuring we capture lessons learned from this cohort and respond to them.","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":0,"attentionScore":18,"attentionReasons":["Current published delivery confidence is Amber"]},{"id":"DFT_0498_2526-Q2","year":2026,"name":"Families First Partnership Programme","department":"DFE","category":"Government Transformation and Service Delivery","description":"The Families First Partnership programme is a national transformation programme to enable local authorities and safeguarding partners to implement the rollout of Family Help, multi-agency child protection teams and increasing the use of Family Networks. The programme was announced in November 2024 and commenced in April 2025. Local authorities should use the ring-fenced funding provided via the local government finance settlement to deliver the programme. There is a national expectation of fully operationalised delivery by March 2027. The core goal of the programme is to rebalance children’s services away from crisis intervention and towards earlier help. The programme supports the government’s mission to provide children with the best start in life, keep children safe and break down barriers to opportunity.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Programme delivery confidence for 2025/26 is Amber. The programme started this year and has moved at pace with national milestones being delivered as planned. This includes confirmation of multi-year funding (£2.4bn over 3 years), published grant determination letters and clear national expectations for full delivery by March 2027 (set out in the updated programme guide). The first independent evaluation report of the Families First for Children Pathfinders programme was also published, alongside several learning documents and engagement events which are accessible by all safeguarding partners and will support national rollout. These steps have provided local areas with ring-fenced funding and clear direction to progress the rollout of family help, multi-agency child protection teams and increased used of family networks. The Amber rating reflects ongoing delivery risk rather than a decline in performance, driven primarily by the complexity of the multi-agency reforms and the reliance on local areas (local authorities and their safeguarding partners) to deliver this change alongside wider pressures and potential competing priorities across public sector reforms. Early insight from delivery plans (which are signed by all safeguarding partners) and the first three monitoring data returns, show commitment to the programme from most local areas during the transformation year, but there remains variance in progress and pace. Looking ahead, programme delivery confidence will depend on local area progress towards the March 2027 expectation of full delivery. Local authorities will need to protect the ring-fenced funding for spend on prevention, and translate national guidance and local ambition into sustained service change that benefits children and families in the local area. National priorities for 2026/27 are strengthening monitoring and assurance, targeting delivery support where risk is identified as highest, and continued work with partners at a local and national level (specifically health and police) to maintain a unified approach for local delivery. Confidence will improve as quarterly monitoring returns track local delivery progress across key (already defined) delivery indicators more closely – meaning timely action can be taken in areas of underperformance and emerging best practice more readily shared.","startDate":"2025-04-01","endDate":"2029-03-31","scheduleNarrative":"The programme's end-date at 25/26-Q4 remained at 31/03/2029. This is the first year of reporting for this programme, and the end date remains unchanged from go-live.","fyBaseline":564.03,"fyForecast":543.13,"fyVariance":3.7,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":2922.61,"costNarrative":"The programme's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) is 3,062,773,075 (as agreed up to 28/29). This is the first year of reporting for this programme, so there is no previously reported figure for comparison.","benefits":6395.78,"benefitsNarrative":"The programme's departmentally agreed Benefits at 25/26-Q4 (measured in £m) stand at 0. This is primarily due to this being the first year of reporting for this programme, and yet to reach the stage where benefits will be delivered. However, the programme will deliver monetised benefits. It is anticipated that these will be confirmed during FY26/27 as evidence of implementation becomes available to refine estimates.","themes":["Delivery & schedule","Cost & funding","Governance & assurance","Technical & integration"],"evidenceExcerpt":"Programme delivery confidence for 2025/26 is Amber. The programme started this year and has moved at pace with national milestones being delivered as planned. This includes confirmation of multi-year funding (£2.4bn over 3 years), published grant determination letters and clear national expectations for full delivery by March 2027 (set out in the updated…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The programme's end-date at 25/26-Q4 remained at 31/03/2029. This is the first year of reporting for this programme, and the end date remains unchanged from go-live.","narrativeClaimKind":null,"history":[{"id":"DFT_0498_2526-Q2","year":2026,"name":"Families First Partnership Programme","department":"DFE","category":"Government Transformation and Service Delivery","description":"The Families First Partnership programme is a national transformation programme to enable local authorities and safeguarding partners to implement the rollout of Family Help, multi-agency child protection teams and increasing the use of Family Networks. The programme was announced in November 2024 and commenced in April 2025. Local authorities should use the ring-fenced funding provided via the local government finance settlement to deliver the programme. There is a national expectation of fully operationalised delivery by March 2027. The core goal of the programme is to rebalance children’s services away from crisis intervention and towards earlier help. The programme supports the government’s mission to provide children with the best start in life, keep children safe and break down barriers to opportunity.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Programme delivery confidence for 2025/26 is Amber. The programme started this year and has moved at pace with national milestones being delivered as planned. This includes confirmation of multi-year funding (£2.4bn over 3 years), published grant determination letters and clear national expectations for full delivery by March 2027 (set out in the updated programme guide). The first independent evaluation report of the Families First for Children Pathfinders programme was also published, alongside several learning documents and engagement events which are accessible by all safeguarding partners and will support national rollout. These steps have provided local areas with ring-fenced funding and clear direction to progress the rollout of family help, multi-agency child protection teams and increased used of family networks. The Amber rating reflects ongoing delivery risk rather than a decline in performance, driven primarily by the complexity of the multi-agency reforms and the reliance on local areas (local authorities and their safeguarding partners) to deliver this change alongside wider pressures and potential competing priorities across public sector reforms. Early insight from delivery plans (which are signed by all safeguarding partners) and the first three monitoring data returns, show commitment to the programme from most local areas during the transformation year, but there remains variance in progress and pace. Looking ahead, programme delivery confidence will depend on local area progress towards the March 2027 expectation of full delivery. Local authorities will need to protect the ring-fenced funding for spend on prevention, and translate national guidance and local ambition into sustained service change that benefits children and families in the local area. National priorities for 2026/27 are strengthening monitoring and assurance, targeting delivery support where risk is identified as highest, and continued work with partners at a local and national level (specifically health and police) to maintain a unified approach for local delivery. Confidence will improve as quarterly monitoring returns track local delivery progress across key (already defined) delivery indicators more closely – meaning timely action can be taken in areas of underperformance and emerging best practice more readily shared.","startDate":"2025-04-01","endDate":"2029-03-31","scheduleNarrative":"The programme's end-date at 25/26-Q4 remained at 31/03/2029. This is the first year of reporting for this programme, and the end date remains unchanged from go-live.","fyBaseline":564.03,"fyForecast":543.13,"fyVariance":3.7,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":2922.61,"costNarrative":"The programme's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) is 3,062,773,075 (as agreed up to 28/29). This is the first year of reporting for this programme, so there is no previously reported figure for comparison.","benefits":6395.78,"benefitsNarrative":"The programme's departmentally agreed Benefits at 25/26-Q4 (measured in £m) stand at 0. This is primarily due to this being the first year of reporting for this programme, and yet to reach the stage where benefits will be delivered. However, the programme will deliver monetised benefits. It is anticipated that these will be confirmed during FY26/27 as evidence of implementation becomes available to refine estimates.","themes":["Delivery & schedule","Cost & funding","Governance & assurance","Technical & integration"],"evidenceExcerpt":"Programme delivery confidence for 2025/26 is Amber. The programme started this year and has moved at pace with national milestones being delivered as planned. This includes confirmation of multi-year funding (£2.4bn over 3 years), published grant determination letters and clear national expectations for full delivery by March 2027 (set out in the updated…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The programme's end-date at 25/26-Q4 remained at 31/03/2029. This is the first year of reporting for this programme, and the end date remains unchanged from go-live.","narrativeClaimKind":null}],"previous":null,"ratingDelta":null,"transition":"Not comparable","endDateDeltaDays":null,"attentionScore":18,"attentionReasons":["Current published delivery confidence is Amber"]},{"id":"UNPUBLISHED-2026-9F1C1C6F9F","year":2026,"name":"Flood and Coastal Risk Management (FCRM) Investment Programme 2026-2029","department":"DEFRA","category":"Infrastructure and Construction","description":"A 3-year capital investment programme for the creation, refurbishment and capital maintenance of England's flood defence infrastructure to protect properties, infrastructure and the environment.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Programme has only existed on GMPP for 2 quarters, however currently retains an Amber rating.","startDate":"2026-04-01","endDate":"2029-03-31","scheduleNarrative":"The programmes end date has remained at 31/03/2029 since GMPP reporting started in Q3 2025/26","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"\"The budget variance is less than or equal to 5%.\"","wholeLifeCost":3861.52,"costNarrative":"Programme WLCs cannot be compared as it has only just begun reporting on GMPP.","benefits":null,"benefitsNarrative":"Programme benefits cannot be compared as it has only just begun reporting on GMPP.","themes":["Cost & funding"],"evidenceExcerpt":"Programme has only existed on GMPP for 2 quarters, however currently retains an Amber rating. The programmes end date has remained at 31/03/2029 since GMPP reporting started in Q3 2025/26","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The programmes end date has remained at 31/03/2029 since GMPP reporting started in Q3 2025/26","narrativeClaimKind":null,"history":[{"id":"UNPUBLISHED-2026-9F1C1C6F9F","year":2026,"name":"Flood and Coastal Risk Management (FCRM) Investment Programme 2026-2029","department":"DEFRA","category":"Infrastructure and Construction","description":"A 3-year capital investment programme for the creation, refurbishment and capital maintenance of England's flood defence infrastructure to protect properties, infrastructure and the environment.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Programme has only existed on GMPP for 2 quarters, however currently retains an Amber rating.","startDate":"2026-04-01","endDate":"2029-03-31","scheduleNarrative":"The programmes end date has remained at 31/03/2029 since GMPP reporting started in Q3 2025/26","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"\"The budget variance is less than or equal to 5%.\"","wholeLifeCost":3861.52,"costNarrative":"Programme WLCs cannot be compared as it has only just begun reporting on GMPP.","benefits":null,"benefitsNarrative":"Programme benefits cannot be compared as it has only just begun reporting on GMPP.","themes":["Cost & funding"],"evidenceExcerpt":"Programme has only existed on GMPP for 2 quarters, however currently retains an Amber rating. The programmes end date has remained at 31/03/2029 since GMPP reporting started in Q3 2025/26","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The programmes end date has remained at 31/03/2029 since GMPP reporting started in Q3 2025/26","narrativeClaimKind":null}],"previous":null,"ratingDelta":null,"transition":"Not comparable","endDateDeltaDays":null,"attentionScore":18,"attentionReasons":["Current published delivery confidence is Amber"]},{"id":"MHCLG_0001_1920-Q3","year":2026,"name":"GRENFELL SITE AND PROGRAMME","department":"MHCLG","category":"Infrastructure and Construction","description":"The Grenfell Tower fire was a national tragedy in which 72 people lost their lives, with a profound and lasting impact on the bereaved families, survivors and the wider community. The Grenfell Programme oversees the works to carefully take down the Grenfell Tower, and works with the Grenfell Tower Memorial Commission to deliver a fitting and lasting memorial that honours those who lost their lives, a second site to carefully lay the Tower to rest and an archive. The programme further remains committed to working with bereaved families, survivors, the immediate community, partners across government, health services and the Council to ensure that families and the community continue to receive the support they need in the long term.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The SRO Delivery Confidence Assessment rating at 25/26-Q4 remained at Amber. Delivery across the programme remains achievable, with active management of risks and issues. In November 2025, Freehaus was selected as the new Multi-Disciplinary Design Team (MDDT). The MDDT is in the process of developing a Memorial Design in collaboration with the community. Engagement with internal and external stakeholders remains critical and a core focus for the programme team.","startDate":"2019-07-15","endDate":null,"scheduleNarrative":"There has been no change to the schedule for the programme.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide costs/schedule information, Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Exempt under Section 43 - Commercial interests","themes":["Delivery & schedule","Commercial & supply chain","Scope & requirements","Governance & assurance"],"evidenceExcerpt":"The SRO Delivery Confidence Assessment rating at 25/26-Q4 remained at Amber. Delivery across the programme remains achievable, with active management of risks and issues. In November 2025, Freehaus was selected as the new Multi-Disciplinary Design Team (MDDT). The MDDT is in the process of developing a Memorial Design in collaboration with the community.…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"There has been no change to the schedule for the programme.","narrativeClaimKind":null,"history":[{"id":"MHCLG_0001_1920-Q3","year":2021,"name":"Grenfell Site and Programme","department":"MHCLG","category":"Infrastructure and Construction","description":"Delivering the vision of the community-led Grenfell Tower Memorial Commission for a fitting memorial for the bereaved, survivors and Grenfell community, recognising the Grenfell Tower fire tragedy and honouring those who lost their lives.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber.This is primarily due to the following factors: The DCA rating was Amber due to the following factors: - A decision on the future of the Tower is due to be taken by the Secretary of State in the summer of 2021. - Technical evidence about the Tower will be published and shared with bereaved, survivors and the community from May 2021 prior to a decision on the future of the Tower by the Secretary of State. - Engagement and decision making about the Tower should align with the principles set out in the Written Ministerial Statement laid in Parliament in November 2018, otherwise there is a risk to successfully delivering the vision of the Grenfell Tower Memorial Commission for a fitting memorial for bereaved, survivors and the community.","startDate":"2019-07-15","endDate":"2026-04-30","scheduleNarrative":"The project end-date is 30 April 2026. This is primarily due to the following factors: - Delays to the procurement of a new principal contractor for safety works required to the Tower, as a decision was taken by the Secretary of State to undertake an open market procurement for the safety works, rather than use a procurement framework. - The Grenfell Tower Memorial Commission will determine the scope of their report in 2021 and this may impact the programme's schedule.","fyBaseline":28.3,"fyForecast":20.83,"fyVariance":-26.0,"varianceNarrative":"The budget variance exceeds 5%. - RDEL: The programme has worked hard to replace contractors and consultants with civil servants which has resulted in value for money savings. Due to Covid-19, in person community events have not happened as planned and virtual events have been organised instead which have been significantly cheaper. This has meant that the RDEL cost has been lower than the full cost and budget expected at the start of the period. - CDEL: Delays to the procurement of a new principal contractor and subsequent safety work has meant that the CDEL cost is lower than the full cost and budget expected at the start of the period.","wholeLifeCost":171.41,"costNarrative":"The projects Baseline Whole Life Cost is �171.41m. This is primarily due to the following factors: - The programme's budgeted whole life costs include the costs needed to deliver the responsibilities associated with ownership of the site until the land is prepared for future use determined by the Grenfell Tower Memorial Commission. - HMT approved Full Business Case 1 to cover the costs need to carry out the final stage of the essential safety works, including phase 3 propping. This work is projected to conclude in May 2022. - A subsequent business case will be needed to cover further costs in preparing the site for future use, assumed to be a memorial. Most of these costs will occur beyond June 2022. - The programme has increased the costs of the programme due to additional responsibility for work previously carried out by the Grenfell Recovery team.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Approvals & decisions","Commercial & supply chain","Delivery & schedule"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber.This is primarily due to the following factors: The DCA rating was Amber due to the following factors: - A decision on the future of the Tower is due to be taken by the Secretary of State in the summer of 2021. - Technical evidence about the Tower will be published and…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project end-date is 30 April 2026. This is primarily due to the following factors: - Delays to the procurement of a new principal contractor for safety works required to the Tower, as a decision was taken by the Secretary of State to undertake an open market procurement for the safety works, rather than use a procurement framework. - The Grenfell Tower Memorial Commission will determine the scope of their report in 2021 and this may impact the programme's schedule.","narrativeClaimKind":null},{"id":"MHCLG_0001_1920-Q3","year":2022,"name":"Grenfell Site and Programme","department":"DLUHC","category":"Infrastructure and Construction","description":"Delivering the vision of the community-led Grenfell Tower Memorial Commission for a fitting memorial for the bereaved, survivors and Grenfell community, recognising the Grenfell Tower fire tragedy and honouring those who lost their lives.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 2020/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 remained at Amber. The programme's delivery confidence score was Amber due to the following factors: - The Secretary of State decided to keep the tower standing for further engagement with bereaved, survivors and local residents. - The vision and scope of the Grenfell memorial is to be determined by the Grenfell Tower Memorial Commission, which is due to be set out later in 2022.","startDate":"2019-07-15","endDate":"2028-06-30","scheduleNarrative":"Compared to 2021-Q4, your programme end-date increased from 30 APR 2026 to 30 JUN 2028. This is primarily due to the following factors: - The programme is engaging with bereaved, survivors and local residents on the future of the tower, following a decision by the Secretary of State to keep the tower standing for a further period. - The Grenfell Tower Memorial Commission will determine the vision and scope of the memorial in 2022, this may impact the programme's schedule. The programme has developed an initial schedule for the memorial, using the Royal Institute of British Architects (RIBA) framework.","fyBaseline":27.54,"fyForecast":25.5,"fyVariance":-7.0,"varianceNarrative":"The budget variance exceeds 5%. Resource Budget: The programme has continued to replace contractors and consultants with civil servants and carry some vacancies into the next financial year. This has resulted in money savings and an overall underspend in staffing costs. Capital Budget: The principal contractor on site has re-sequenced activity planned over its contract duration. This has meant some costs anticipated in 2021/22 will now not take place, leading to an underspend in 2022/23. There is no impact on critical activities and the anticipated completion date. Additionally, an underspend on the Lancaster West Refurbishment accrual for 2020/21 contributed to reducing actuals during 2021/22.","wholeLifeCost":157.0,"costNarrative":"Compared to 2021-Q4, the programme's baseline Whole Life Cost decreased from 171.41 (£m) to 156.94 (£m). This is primarily due to the following factors: The programme's baseline figures for 2021/22 were reduced following the Supplementary Estimates process. Amounts returned were predominantly unused contingency, while some phase 3 propping costs moved into 2022/23, explaining the change to the total baseline cost from 2021-Q4. - The budgeted whole life costs include costs needed to deliver responsibilities associated with ownership of the site, until the land is prepared for future use determined by the Grenfell Tower Memorial Commission. - HM Treasury approved Full Business Case (FBC) for phase 1 (safety works) to cover costs needed to carry out the final stage of essential safety works, including phase 3 propping. This work is projected to conclude in September 2022. - Subsequent business cases are required to cover costs beyond September 2022. FBC phase 2 (future of the site) received conditional approval from DLUHC's Investment Sub Committee and covers activity to prepare the site for future use following the completion of phase 3 propping. A business case will be needed to cover the final next phase of the programme, assumed to be memorial construction.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 2020/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 remained at Amber. The programme's delivery confidence score was Amber due to the following factors: - The Secretary of State decided to keep the tower standing for further engagement with bereaved, survivors and local residents. -…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to 2021-Q4, your programme end-date increased from 30 APR 2026 to 30 JUN 2028. This is primarily due to the following factors: - The programme is engaging with bereaved, survivors and local residents on the future of the tower, following a decision by the Secretary of State to keep the tower standing for a further period. - The Grenfell Tower Memorial Commission will determine the vision and scope of the memorial in 2022, this may impact the programme's schedule. The programme has developed an initial schedule for the memorial, using the Royal Institute of British Architects (RIBA) framework.","narrativeClaimKind":null},{"id":"MHCLG_0001_1920-Q3","year":2023,"name":"Grenfell Site and Programme","department":"DLUHC","category":"Infrastructure and Construction","description":"The programme achieved a significant milestone when the Grenfell Tower Memorial Commission (GTMC) published their interim report in May 22. Safety works on the tower completed in Oct 22 (on time, to budget and scope). Active monitoring continues to track the rate of degradation within the tower. Secretary of State held a Town Hall event for Bereaved and Survivors in Mar 23 and a community event in May 23, achieving the highest level of engagement with the community so far. The GTMC are working towards producing a final report in Sep 23.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber (SRO rating). This is primarily due to the following factors. Current rating is Amber. The Secretary of State has not yet made a decision about the future of the tower to allow more time for engagement and therefore the DCA remains amber. The safety works on the site have completed and the tower is now fully propped. The vision for the future memorial is to be determined by the Grenfell Tower Memorial Commission. The GTMC are working towards a final report and design brief to be published in 2023","startDate":"2019-07-15","endDate":"2029-03-30","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 increased from 2028-06-30 to 2029-03-30. This is primarily due to the following factors. - Secretary of State has entered a further round of engagement with bereaved, survivors and residents, delaying the decision on the tower.- Further engagement and intentional conversations surrounding the future of the tower will need to happen in the next round of engagement with Secretary of States approval - The Grenfell Tower Memorial Commissions timelines have been delayed from original plans due to several factors, including the resignation of co-chair Michael Lockwood and the need to increase engagement numbers on views for the memorial. This has meant the final report and design brief publication timelines have been pushed back further into 2023, impacting the overall schedule of the design competition and Royal Institute of British Architects (RIBA) stages to get towards the construction of the memorial. Using this agreed schedule for the memorial, the estimated end date for the project is now March 202","fyBaseline":15.4,"fyForecast":15.14,"fyVariance":-2.0,"varianceNarrative":"The budget variance is inferior or equal to 5%. The programmes budget/forecast variance is mainly due to an underspend on Resource Departmental expenditure limit (RDEL). - RDEL: The programme has continued to replace contractors and consultants with civil servants, which, alongside the introduction of controls on recruitment, have primarily contributed towards the RDEL underspend. - Capital DEL: Following the completion of safety works on time and to budget, CDEL costs have become static to reflect the ongoing maintenance required on site, resulting in a very minor overspend against the revised budget.","wholeLifeCost":291.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 increased from 157m. to 291m. This is primarily due to the following factors. - The change in baseline whole life cost, compared to the previous period, is due to baselines being updated to reflect updates to the programmes Strategic Outline Case. The programmes budgeted whole life cost now covers the costs needed to deliver the responsibilities associated with ownership of the site until the land is prepared for future use determined by the Grenfell Tower Memorial Commission. Changes in 22/23 reflect the reduction in 22/23 budgets in line with the revised programme requirements due to the delay in deconstruction. - To date, HM Treasury have approved Full Business Case (FBC) phase 1 and a Programme Business Case (PBC) covering one year within phase 2. FBC phase 1 covered costs to carry out the final stage of the essential safety works, which concluded in October 2022, while PBC phase 2 covers essential site maintenance. Future business cases will be developed covering a range of scenarios and timelines associated with preparing the site for future use, and to cover the final phase of the programme, assumed to be construction of a memorial","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. The project did not provide departmental-agree monetised benefits at 22/23-Q4. Due to the sensitivities of the programme, benefits are not tracked.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber (SRO rating). This is primarily due to the following factors. Current rating is Amber. The Secretary of State has not yet made a decision about the future of the tower to allow more time for engagement and therefore the DCA remains amber. The safety…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 increased from 2028-06-30 to 2029-03-30. This is primarily due to the following factors. - Secretary of State has entered a further round of engagement with bereaved, survivors and residents, delaying the decision on the tower.- Further engagement and intentional conversations surrounding the future of the tower will need to happen in the next round of engagement with Secretary of States approval - The Grenfell Tower Memorial Commissions timelines have been delayed from original plans due to several factors, including the resignation of co-chair Michael Lockwood and the need to increase engagement numbers on views for the memorial. This has meant the final report and design brief publication timelines have been pushed back further into 2023, impacting the overall schedule of the design competition and Royal Institute of British Architects (RIBA) stages to get towards the construction of the memorial. Using this agreed schedule for the memorial, the estimated end date for the project is now March 202","narrativeClaimKind":null},{"id":"MHCLG_0001_1920-Q3","year":2024,"name":"Grenfell Site and Programme","department":"DLUHC","category":"Infrastructure and Construction","description":"The Grenfell Site and Programme aims to deliver the vision of the Grenfell Tower Memorial Commission for a fitting memorial to be built on the Grenfell Tower site and working towards a Ministerial decision on the future of the Tower.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. As at March 24: We continue to assess the delivery confidence of the programme as amber._x000D_ _x000D_ The programme continues to focus on the IPA recommendations focussed on supporting the Grenfell Tower Memorial Commission (GTMC) to launch the design competition.","startDate":"2019-07-15","endDate":"2030-01-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 increased from 2029-03-30 to 2030-01-31. This is primarily due to the following factors. As at March 24: The project's end-date is January 2030. This is an extension of one year due to the timing of the decision being made on the future of the tower.","fyBaseline":22.31,"fyForecast":16.1,"fyVariance":-28.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. Some costs have moved into future financial years to accommodate the revised memorial timeline.","wholeLifeCost":290.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 decreased from 291m. to 290m. This is primarily due to the following factors. The cost profile was rebaselined.","benefits":0.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 0m. Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 0m.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. As at March 24: We continue to assess the delivery confidence of the programme as amber._x000D_ _x000D_ The programme continues to focus on the IPA recommendations focussed…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 increased from 2029-03-30 to 2030-01-31. This is primarily due to the following factors. As at March 24: The project's end-date is January 2030. This is an extension of one year due to the timing of the decision being made on the future of the tower.","narrativeClaimKind":null},{"id":"MHCLG_0001_1920-Q3","year":2025,"name":"GRENFELL SITE AND PROGRAMME","department":"MHCLG","category":"Infrastructure and Construction","description":"The Grenfell Programme continues to support the recovery of the Grenfell community and is currently preparing to carefully take down the Grenfell Tower. We continue to work in partnership with the Grenfell Tower Memorial Commission to deliver a fitting memorial, and deliver the Grenfell Tower Memorial Commission's other recommendations for Government, including the provision of a second site, where materials from the Tower not used in the memorial will be laid to rest and a physical and digital archive.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The previous assurance review gave an amber rating to the programme in March 2024, with actions linked to a timeline and pathway for the bringing down of the Grenfell Tower. Since then a decision was announced in February 2025 to take down the Grenfell Tower. The programme has also supported the launch of the Grenfell Tower Memorial Commission's Memorial Design Team Selection Process. The Department continues to progress the Grenfell Tower Memorial Commission's recommendations for Government and ensure the Grenfell community is supported over the longer term, working with local partners.","startDate":"2019-07-15","endDate":"2031-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/01/2030 to 31/03/2031. This is primarily due to the following factors‚ Following the DPMs decision to carefully take down Grenfell Tower and the launch of the Multi Disciplinary Design Team Selection Process, the Grenfell Programme is on track to deliver to agreed timelines. This includes an additional year to provide for deconstruction and construction contingency.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 43 - Commercial interests","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ Given the nature of the Programme, it has been agreed with NISTA that it would be insensitive and not appropriate to track monitised benefits.","themes":["Approvals & decisions","Commercial & supply chain","Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The previous assurance review gave an amber rating to the programme in March 2024, with actions linked to a timeline and pathway for the bringing down of the Grenfell…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/01/2030 to 31/03/2031. This is primarily due to the following factors‚ Following the DPMs decision to carefully take down Grenfell Tower and the launch of the Multi Disciplinary Design Team Selection Process, the Grenfell Programme is on track to deliver to agreed timelines. This includes an additional year to provide for deconstruction and construction contingency.","narrativeClaimKind":null},{"id":"MHCLG_0001_1920-Q3","year":2026,"name":"GRENFELL SITE AND PROGRAMME","department":"MHCLG","category":"Infrastructure and Construction","description":"The Grenfell Tower fire was a national tragedy in which 72 people lost their lives, with a profound and lasting impact on the bereaved families, survivors and the wider community. The Grenfell Programme oversees the works to carefully take down the Grenfell Tower, and works with the Grenfell Tower Memorial Commission to deliver a fitting and lasting memorial that honours those who lost their lives, a second site to carefully lay the Tower to rest and an archive. The programme further remains committed to working with bereaved families, survivors, the immediate community, partners across government, health services and the Council to ensure that families and the community continue to receive the support they need in the long term.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The SRO Delivery Confidence Assessment rating at 25/26-Q4 remained at Amber. Delivery across the programme remains achievable, with active management of risks and issues. In November 2025, Freehaus was selected as the new Multi-Disciplinary Design Team (MDDT). The MDDT is in the process of developing a Memorial Design in collaboration with the community. Engagement with internal and external stakeholders remains critical and a core focus for the programme team.","startDate":"2019-07-15","endDate":null,"scheduleNarrative":"There has been no change to the schedule for the programme.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide costs/schedule information, Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Exempt under Section 43 - Commercial interests","themes":["Delivery & schedule","Commercial & supply chain","Scope & requirements","Governance & assurance"],"evidenceExcerpt":"The SRO Delivery Confidence Assessment rating at 25/26-Q4 remained at Amber. Delivery across the programme remains achievable, with active management of risks and issues. In November 2025, Freehaus was selected as the new Multi-Disciplinary Design Team (MDDT). The MDDT is in the process of developing a Memorial Design in collaboration with the community.…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"There has been no change to the schedule for the programme.","narrativeClaimKind":null}],"previous":{"id":"MHCLG_0001_1920-Q3","year":2025,"name":"GRENFELL SITE AND PROGRAMME","department":"MHCLG","category":"Infrastructure and Construction","description":"The Grenfell Programme continues to support the recovery of the Grenfell community and is currently preparing to carefully take down the Grenfell Tower. We continue to work in partnership with the Grenfell Tower Memorial Commission to deliver a fitting memorial, and deliver the Grenfell Tower Memorial Commission's other recommendations for Government, including the provision of a second site, where materials from the Tower not used in the memorial will be laid to rest and a physical and digital archive.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The previous assurance review gave an amber rating to the programme in March 2024, with actions linked to a timeline and pathway for the bringing down of the Grenfell Tower. Since then a decision was announced in February 2025 to take down the Grenfell Tower. The programme has also supported the launch of the Grenfell Tower Memorial Commission's Memorial Design Team Selection Process. The Department continues to progress the Grenfell Tower Memorial Commission's recommendations for Government and ensure the Grenfell community is supported over the longer term, working with local partners.","startDate":"2019-07-15","endDate":"2031-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/01/2030 to 31/03/2031. This is primarily due to the following factors‚ Following the DPMs decision to carefully take down Grenfell Tower and the launch of the Multi Disciplinary Design Team Selection Process, the Grenfell Programme is on track to deliver to agreed timelines. This includes an additional year to provide for deconstruction and construction contingency.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 43 - Commercial interests","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ Given the nature of the Programme, it has been agreed with NISTA that it would be insensitive and not appropriate to track monitised benefits.","themes":["Approvals & decisions","Commercial & supply chain","Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The previous assurance review gave an amber rating to the programme in March 2024, with actions linked to a timeline and pathway for the bringing down of the Grenfell…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/01/2030 to 31/03/2031. This is primarily due to the following factors‚ Following the DPMs decision to carefully take down Grenfell Tower and the launch of the Multi Disciplinary Design Team Selection Process, the Grenfell Programme is on track to deliver to agreed timelines. This includes an additional year to provide for deconstruction and construction contingency.","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":null,"attentionScore":18,"attentionReasons":["Current published delivery confidence is Amber"]},{"id":"HMRC_0164_2223-Q3","year":2026,"name":"HMRC NORTHERN IRELAND DELIVERY PROGRAMME","department":"HMRC","category":"Information and Communications Technology (ICT)","description":"The Northern Ireland Delivery Programme (NIDP) was established in April 2022 to continue delivery of HMRC policy and legislative commitments for Northern Ireland, following the United Kingdom's exit from the European Union. It includes delivery of the changes to HMRC systems to enable HMRC and businesses to operate within the terms of the Windsor Framework. It is a 5-year programme that is due to close by April 2027.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"NISTA's Delivery Confidence Assessment rating at 25/26-Q4 is Amber. This is primarily due to the following factors. The programme continues to progress delivery of commitments within the Windsor Framework, as agreed between the UK and the EU. The Amber delivery confidence assessment reflects that the programme is on track to complete delivery of the remaining scope during 2026/27, but there remain some technically complex changes to achieve before closure can be confirmed. Risks to delivery and closure plans are being managed within existing programme and departmental governance.","startDate":"2022-04-01","endDate":"2027-03-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remains scheduled to finish on 31/03/2027. This is primarily due to the following factors. Progress continues to be made with delivery against the programme strategic outcomes. Plans/expectations for 2026/27 to deliver the remaining scope and for closure of the programme are on track.","fyBaseline":123.11,"fyForecast":123.11,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%","wholeLifeCost":712.9,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmental-agree Whole Life Cost at 25/26-Q4 increased from £573.05m to £717.7m This is primarily due to the following factors. In April 2025 the programme lifecycle was extended by 2 years, to meet the latest legislative and ongoing commitments, as set out in the business case. The programme is now due to close in April 2027. The additional costs are for IT delivery, resourcing, live service and includes contingency, for the additional period.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. This is unchanged from when the business case was first baselined and reflects that the programme is managing changes to customs and indirect tax systems to comply with policy and legislative requirements.","themes":["Delivery & schedule","Cost & funding","Scope & requirements","Approvals & decisions"],"evidenceExcerpt":"NISTA's Delivery Confidence Assessment rating at 25/26-Q4 is Amber. This is primarily due to the following factors. The programme continues to progress delivery of commitments within the Windsor Framework, as agreed between the UK and the EU. The Amber delivery confidence assessment reflects that the programme is on track to complete delivery of the…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remains scheduled to finish on 31/03/2027. This is primarily due to the following factors. Progress continues to be made with delivery against the programme strategic outcomes. Plans/expectations for 2026/27 to deliver the remaining scope and for closure of the programme are on track.","narrativeClaimKind":null,"history":[{"id":"HMRC_0164_2223-Q3","year":2023,"name":"HMRC Northern Ireland Programme","department":"HMRC","category":"ICT","description":"The NI Delivery Programme is managing changes to HMRC Customs and Indirect Tax systems to enable HMRC and traders to operate, within the terms of the Northern Ireland Protocol, now replaced by the Windsor Framework. Also, for the UK to remain aligned with other EU customs legislation for Northern Ireland.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 is Amber. This is primarily due to the following factors. Substantive progress continues to be made with delivery against the programme strategic outcomes. The 2023/24 delivery plans have been baselined and the announcement of the Windsor Framework in February 2023 has provided clarity on the way forward. The programme is reporting Amber, whilst it assesses the impacts of delivering the new Windsor Framework requirements against existing priorities.","startDate":"2022-04-01","endDate":"2025-03-31","scheduleNarrative":"The project's end-date at 22/23-Q4 is 2025-03-31. This is primarily due to the following factors. The programme is broadly on track to deliver during the lifecycle. The plans now also include delivery of HMRC Windsor Framework system requirements including for the 'green lane' for October 2024.","fyBaseline":163.8,"fyForecast":149.4,"fyVariance":-9.0,"varianceNarrative":"The costs of delivery in 2022/23 were lower than the original baseline mainly driven by elements that were paused due to the negotiations around the NI Protocol, the removal of some scope from programme baseline and the deferral of some elements of system re-platforming.","wholeLifeCost":388.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 22/23-Q4 is 388m. This is primarily due to the following factors. The project's departmentally-agreed Whole Life Cost at 22/23-Q4 is 388m. This is due to: The baselined whole life costs for the programme includes programme team resourcing, technology costs and on-going live service support to deliver the original scope of the programme. Delivering the system requirements for the new Windsor Framework will require additional funding over the next 2 years.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. The project did not provide departmental-agree monetised benefits at 22/23-Q4. The programme is managing changes to customs and indirect tax systems to comply with policy and legislative requirements","themes":["Cost & funding","Delivery & schedule","Scope & requirements","Technical & integration"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 is Amber. This is primarily due to the following factors. Substantive progress continues to be made with delivery against the programme strategic outcomes. The 2023/24 delivery plans have been baselined and the announcement of the Windsor Framework in February 2023 has…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 22/23-Q4 is 2025-03-31. This is primarily due to the following factors. The programme is broadly on track to deliver during the lifecycle. The plans now also include delivery of HMRC Windsor Framework system requirements including for the 'green lane' for October 2024.","narrativeClaimKind":null},{"id":"HMRC_0164_2223-Q3","year":2024,"name":"HMRC Northern Ireland Programme","department":"HMRC","category":"ICT","description":"The Northern Ireland Delivery Programme (NIDP) was established as part of HMRC's 2021 Spending Review settlement to continue delivery of HMRC policy and legislative commitments for Northern Ireland, following the United Kingdom's exit from the European Union. _x000D_ _x000D_ It includes delivery of the changes to HMRC systems to enable HMRC and businesses to operate initially within the terms of the Northern Ireland Protocol, and more recently in 2023, within the terms of the Windsor Framework.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The programme continues to progress delivery of commitments within the Windsor Framework to legislative timelines agreed between UK and EU. The Amber delivery confidence assessment reflect the overall scale and technical complexity of the programme, with risks that are being managed within existing programme and departmental governance.","startDate":"2022-04-01","endDate":"2025-03-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2025-03-31. This is primarily due to the following factors. Substantive progress continues to be made with delivery against the programme strategic outcomes; and our 2024/25 delivery plans are now finalised and are on track.","fyBaseline":216.14,"fyForecast":203.06,"fyVariance":-6.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The decrease is predominantly due to cost savings following reductions in supplier estimates as projects progress through their delivery life cycle; and delays with onboarding supplier resources, which has meant costs have been incurred later and at a slower rate, than initially forecast.","wholeLifeCost":498.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 increased from 388m. to 498m. This is primarily due to the following factors. The full lifecycle cost increase is predominantly due to a change in how overhead and non-functional costs are apportioned for projects that are making changes to the Customs Declaration Service. It also includes the additional of costs to deliver new scope requirements, since the Windsor Framework was announced in February 2023. There will be further additional costs for 2024/25 that have not yet been baselined.","benefits":0.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 0m. The programme is managing changes to customs and indirect tax systems to comply with policy and legislative requirements","themes":["Delivery & schedule","Cost & funding","Commercial & supply chain","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The programme continues to progress delivery of commitments within the Windsor Framework to legislative timelines agreed between UK and EU. The Amber delivery…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2025-03-31. This is primarily due to the following factors. Substantive progress continues to be made with delivery against the programme strategic outcomes; and our 2024/25 delivery plans are now finalised and are on track.","narrativeClaimKind":null},{"id":"HMRC_0164_2223-Q3","year":2025,"name":"HMRC NORTHERN IRELAND DELIVERY PROGRAMME","department":"HMRC","category":"ICT","description":"The Northern Ireland Delivery Programme (NIDP) was established in April 2022 to continue delivery of HMRC policy and legislative commitments for Northern Ireland, following the United Kingdom's exit from the European Union. It includes delivery of the changes to HMRC systems to enable HMRC and businesses to operate within the terms of the Windsor Framework.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors, The programme continues to progress delivery of commitments within the Windsor Framework and Union Customs Code, as agreed between the UK and the EU. The Amber delivery confidence assessment is consistent with previous reports, and reflects the overall scale and technical complexity of the programme, with risks that are being managed within existing programme and departmental governance.","startDate":"2022-04-01","endDate":"2027-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2025 to 31/03/2027. This is primarily due to the following factors, Substantive progress continues to be made with delivery against the programme strategic outcomes. However, since the 2023/24 transparency data was published, the lifecycle of the programme has been extended by 2 years to 2027 to meet current legislative and on-going commitments and fully deliver the strategic outcomes.","fyBaseline":180.8,"fyForecast":195.69,"fyVariance":8.24,"varianceNarrative":"The budget variance exceeds 5%. The programme progressed several large projects and changes during 2024/25, including completing required re-platforming of ageing excise systems. The in-year increase is the cumulative impact, where some of the early cost estimates have increased, as the projects have progressed through the IT change lifecycle.","wholeLifeCost":573.05,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 498 to 573. This is primarily due to the following factors, The increase is largely driven by changes in legislation that have introduced additional scope and costs and is off-set by lower costs in the original core scope.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors, The programme is managing changes to customs and indirect tax systems to comply with policy and legislative requirements.","themes":["Cost & funding","Delivery & schedule","Scope & requirements","Technical & integration"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors, The programme continues to progress delivery of commitments within the Windsor Framework and Union Customs Code, as agreed between the UK and the EU. The Amber…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2025 to 31/03/2027. This is primarily due to the following factors, Substantive progress continues to be made with delivery against the programme strategic outcomes. However, since the 2023/24 transparency data was published, the lifecycle of the programme has been extended by 2 years to 2027 to meet current legislative and on-going commitments and fully deliver the strategic outcomes.","narrativeClaimKind":null},{"id":"HMRC_0164_2223-Q3","year":2026,"name":"HMRC NORTHERN IRELAND DELIVERY PROGRAMME","department":"HMRC","category":"Information and Communications Technology (ICT)","description":"The Northern Ireland Delivery Programme (NIDP) was established in April 2022 to continue delivery of HMRC policy and legislative commitments for Northern Ireland, following the United Kingdom's exit from the European Union. It includes delivery of the changes to HMRC systems to enable HMRC and businesses to operate within the terms of the Windsor Framework. It is a 5-year programme that is due to close by April 2027.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"NISTA's Delivery Confidence Assessment rating at 25/26-Q4 is Amber. This is primarily due to the following factors. The programme continues to progress delivery of commitments within the Windsor Framework, as agreed between the UK and the EU. The Amber delivery confidence assessment reflects that the programme is on track to complete delivery of the remaining scope during 2026/27, but there remain some technically complex changes to achieve before closure can be confirmed. Risks to delivery and closure plans are being managed within existing programme and departmental governance.","startDate":"2022-04-01","endDate":"2027-03-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remains scheduled to finish on 31/03/2027. This is primarily due to the following factors. Progress continues to be made with delivery against the programme strategic outcomes. Plans/expectations for 2026/27 to deliver the remaining scope and for closure of the programme are on track.","fyBaseline":123.11,"fyForecast":123.11,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%","wholeLifeCost":712.9,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmental-agree Whole Life Cost at 25/26-Q4 increased from £573.05m to £717.7m This is primarily due to the following factors. In April 2025 the programme lifecycle was extended by 2 years, to meet the latest legislative and ongoing commitments, as set out in the business case. The programme is now due to close in April 2027. The additional costs are for IT delivery, resourcing, live service and includes contingency, for the additional period.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. This is unchanged from when the business case was first baselined and reflects that the programme is managing changes to customs and indirect tax systems to comply with policy and legislative requirements.","themes":["Delivery & schedule","Cost & funding","Scope & requirements","Approvals & decisions"],"evidenceExcerpt":"NISTA's Delivery Confidence Assessment rating at 25/26-Q4 is Amber. This is primarily due to the following factors. The programme continues to progress delivery of commitments within the Windsor Framework, as agreed between the UK and the EU. The Amber delivery confidence assessment reflects that the programme is on track to complete delivery of the…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remains scheduled to finish on 31/03/2027. This is primarily due to the following factors. Progress continues to be made with delivery against the programme strategic outcomes. Plans/expectations for 2026/27 to deliver the remaining scope and for closure of the programme are on track.","narrativeClaimKind":null}],"previous":{"id":"HMRC_0164_2223-Q3","year":2025,"name":"HMRC NORTHERN IRELAND DELIVERY PROGRAMME","department":"HMRC","category":"ICT","description":"The Northern Ireland Delivery Programme (NIDP) was established in April 2022 to continue delivery of HMRC policy and legislative commitments for Northern Ireland, following the United Kingdom's exit from the European Union. It includes delivery of the changes to HMRC systems to enable HMRC and businesses to operate within the terms of the Windsor Framework.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors, The programme continues to progress delivery of commitments within the Windsor Framework and Union Customs Code, as agreed between the UK and the EU. The Amber delivery confidence assessment is consistent with previous reports, and reflects the overall scale and technical complexity of the programme, with risks that are being managed within existing programme and departmental governance.","startDate":"2022-04-01","endDate":"2027-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2025 to 31/03/2027. This is primarily due to the following factors, Substantive progress continues to be made with delivery against the programme strategic outcomes. However, since the 2023/24 transparency data was published, the lifecycle of the programme has been extended by 2 years to 2027 to meet current legislative and on-going commitments and fully deliver the strategic outcomes.","fyBaseline":180.8,"fyForecast":195.69,"fyVariance":8.24,"varianceNarrative":"The budget variance exceeds 5%. The programme progressed several large projects and changes during 2024/25, including completing required re-platforming of ageing excise systems. The in-year increase is the cumulative impact, where some of the early cost estimates have increased, as the projects have progressed through the IT change lifecycle.","wholeLifeCost":573.05,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 498 to 573. This is primarily due to the following factors, The increase is largely driven by changes in legislation that have introduced additional scope and costs and is off-set by lower costs in the original core scope.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors, The programme is managing changes to customs and indirect tax systems to comply with policy and legislative requirements.","themes":["Cost & funding","Delivery & schedule","Scope & requirements","Technical & integration"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors, The programme continues to progress delivery of commitments within the Windsor Framework and Union Customs Code, as agreed between the UK and the EU. The Amber…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2025 to 31/03/2027. This is primarily due to the following factors, Substantive progress continues to be made with delivery against the programme strategic outcomes. However, since the 2023/24 transparency data was published, the lifecycle of the programme has been extended by 2 years to 2027 to meet current legislative and on-going commitments and fully deliver the strategic outcomes.","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":0,"attentionScore":18,"attentionReasons":["Current published delivery confidence is Amber"]},{"id":"HO_0033_1415-Q3","year":2026,"name":"HOME OFFICE BIOMETRICS (HOB) PROGRAMME","department":"HO","category":"Information and Communications Technology (ICT)","description":"Home Office wide convergence programme for biometrics within Government. Home Office Biometrics systems manage unique, digitised and verified identities formed from an individual’s biometric data. The modalities currently used are fingerprint, facial image and DNA. They provide for the fast, accurate and reliable identification of individuals critical to business operations within Law enforcement, Immigration, Borders, Passport and Criminal Justice.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared with Q4 2024/25, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at Q4 2025/26 remains Amber. This reflects the complexity of the Home Office Biometrics (HOB) Programme, which continues to deliver against a broad set of stakeholder requirements within a complex supplier landscape. During 2025/26, the programme has made measurable progress, including successful delivery of key milestones such as Strategic Matcher Stage 1. While challenges remain, the programme continues to advance delivery in line with its overall objectives.","startDate":"2014-04-01","endDate":"2026-12-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same. This is primarily due to the following factors‚ delivery has remained on track and activity to transition to a Biometric Service has been progressed to plan in preparation for closure of the programme.","fyBaseline":110.04,"fyForecast":107.03,"fyVariance":2.74,"varianceNarrative":"The budget variance is less than or equal to 5%","wholeLifeCost":1809.85,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) increase from £1,561m to £1,746m. This is primarily due to the following factors: Increase in programme cost, additional year reported and increase in Business As Usual (BAU)/Live Run cost.","benefits":1309.81,"benefitsNarrative":"Compared to financial year 24/25-Q4, the programmes departmentally agreed Benefits at 25/26-Q4 increased slightly from £110m in 24/25 to £117m in 25/26. This is primarily due to an updated benefits profile, including increased benefits associated with fingerprint matching.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Governance & assurance"],"evidenceExcerpt":"Compared with Q4 2024/25, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at Q4 2025/26 remains Amber. This reflects the complexity of the Home Office Biometrics (HOB) Programme, which continues to deliver against a broad set of stakeholder requirements within a complex supplier landscape. During 2025/26, the programme has made measurable…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same. This is primarily due to the following factors‚ delivery has remained on track and activity to transition to a Biometric Service has been progressed to plan in preparation for closure of the programme.","narrativeClaimKind":null,"history":[{"id":"HO_0033_1415-Q3","year":2020,"name":"Home Office Biometrics (HOB) Programme","department":"HO","category":"ICT","description":"Home Office wide convergence programme for biometrics within Government, covering border security, law enforcement and intelligence.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber, which has declined since last year�s Q2 1819 Amber/Green, due primarily to the following factors; - Recognising that the programme was now well advanced, there was a need for an increasing focus on ensuring commitment from the various users of the new services to benefits realisation and reporting of achievements. During 19/20 work has been focused on benefits realisation with commitments sought from key stakeholders and regular updates provided at the programme board. - During 19/20 HOB embedded the customer board and work has begun to develop the design of the future HOB Product Organisation. This will inform the programme approach for transition and closure. Since the Q2 1920 (30th September 2019) Amber IPA DCA, the following non-project operating environment activities have impacted the original Q2 IPA DCA; - HOB Continues to face some affordability challenges. Due to the slippage of milestone payments to supplier, these will be pushed into 20/21 making the budget for the next FY extremely challenging. Since the Q2 1920 (30th September 2019) Amber IPA DCA, the following primary project actions have impacted the original Q2 IPA DCA; - Since September 2019, HOB has recruited 11 additional Civil Servants to the programme to replace contingent resources working in project delivery roles, this will reduce the cost impact on the programme. The HOB programme has undertaken two recruitment activities to secure a dedicated, skilled and experienced Benefits Manager. Both recruitments were unsuccessful. - An interim HOB Benefits Manager was appointed and has worked with business design colleagues, to review and validate the assumptions, evidence and certainty underpinning each programme level benefits. These have been reflected as updated benefit profiles within the Benefit Realisation Plan in the 19/20 Programme Business Case and agreed with benefit owners at individual project boards. - The programme has also embedded benefits reporting (both delivered and forecast benefits) into its internal governance and continued to report quarterly at the Programme Board. The Programme now assesses the impact upon business benefits as an integral part of any critical decisions related changes to project scope, quality, cost and timelines.","startDate":"2014-04-01","endDate":"2021-09-30","scheduleNarrative":"The scheduled baseline project end date at Q2 1920 (30th September 2019) is 30/09/21, has lengthened by 548 days since last year's Q2 1819 date of 31/03/20, due primarily to the following factors; - The Programme completion date was extended to September 2021 to complete existing Strategic Projects, as indicated in the latest Programme Business Case. Since the Q2 1920 (30th September 2019) baseline project end date of 30/09/21, the following non-project operating environment activities have impacted the original Q2 baseline project end date; - HOB programme team are currently working from home due to the outbreak of COVID-19. The programme is looking at the impact of the current situation on HOB suppliers to assess their ability to deliver to the current milestones. Since the Q2 1920 (30th September 2019) baseline project end date of 30/09/21, the following primary project actions have impacted the original Q2 baseline project end date; - HOB Strategic Matcher (Fingerprints) Platform Go-Live moved to December 2020 as a key supplier is unable to meet the agreed Multi-Supplier Implementation Plan. - HOB DNA New Hosting Environment Go-Live has moved to June 2020 due to impact of time lost while developing a remote access solution for project staff because of COVID 19 working from home requirements - UK Prum fingerprints system Go-Live has moved to June 2020. The EU Parliament have been given an additional month to MEPs to approve the UK Prum fingerprints system, resulting in the delay. Given the overall delay to the Strategic Matcher project the programme end date is currently under review and may potentially be pushed back by six months to March 2022. This is currently being worked through.","fyBaseline":85.56,"fyForecast":85.56,"fyVariance":0.0,"varianceNarrative":"Budget variance less than 5%","wholeLifeCost":869.7,"costNarrative":"The baseline Whole Life Cost at Q2 1920 (30th September 2019) is �869.70 m, has increased by �27.33 m since last year's Q2 1819 (�m) baseline Whole Life Cost of �842.37 m, due primarily to the following factors; - The 18/19 Programme Business Case return was prior to the key procurement and contract awards. The 19/20 return aligns to the latest Programme Business Case and includes the preferred bidder costs which has increased overall programme costs. - In addition to this the 19/20 return incudes an additional year, (19-20 to 29/30) whereas 18/19 only included business as usual costs up to 28/29.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Governance & assurance"],"evidenceExcerpt":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber, which has declined since last year�s Q2 1819 Amber/Green, due primarily to the following factors; - Recognising that the programme was now well advanced, there was a need for an increasing focus on ensuring commitment from the various users of the new services to…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2020","sourceLabel":"IPA Annual Report 2019-20","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The scheduled baseline project end date at Q2 1920 (30th September 2019) is 30/09/21, has lengthened by 548 days since last year's Q2 1819 date of 31/03/20, due primarily to the following factors; - The Programme completion date was extended to September 2021 to complete existing Strategic Projects, as indicated in the latest Programme Business Case. Since the Q2 1920 (30th September 2019) baseline project end date of 30/09/21, the following non-project operating environment activities have impacted the original Q2 baseline project end date; - HOB programme team are currently working from home due to the outbreak of COVID-19. The programme is looking at the impact of the current situation on HOB suppliers to assess their ability to deliver to the current milestones. Since the Q2 1920 (30th September 2019) baseline project end date of 30/09/21, the following primary project actions have impacted the original Q2 baseline project end date; - HOB Strategic Matcher (Fingerprints) Platform Go-Live moved to December 2020 as a key supplier is unable to meet the agreed Multi-Supplier Implementation Plan. - HOB DNA New Hosting Environment Go-Live has moved to June 2020 due to impact of time lost while developing a remote access solution for project staff because of COVID 19 working from home requirements - UK Prum fingerprints system Go-Live has moved to June 2020. The EU Parliament have been given an additional month to MEPs to approve the UK Prum fingerprints system, resulting in the delay. Given the overall delay to the Strategic Matcher project the programme end date is currently under review and may potentially be pushed back by six months to March 2022. This is currently being worked through.","narrativeClaimKind":null},{"id":"HO_0033_1415-Q3","year":2021,"name":"Home Office Biometrics (HOB) Programme","department":"HO","category":"ICT","description":"Home Office wide convergence programme for biometrics within Government, covering border security, law enforcement and intelligence.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating increased from Amber to Amber/red. This is primarily due to the following factors: Over the last year the programme has made good progress on key deliverables, including the delivery of new capabilities, the decommissioning of legacy systems and the transition to new suppliers. However, delivery of the Matcher Project continues to be challenging and ongoing delays to testing activity and data migration may impact timelines and the programme's ability to achieve the projected closure date of March 2022.","startDate":"2014-04-01","endDate":"2022-03-31","scheduleNarrative":"Compared to financial year 19/20-Q2, the project's end-date increased from 30 September 2021 to 31 March 2022 . This is primarily due to the following factors: As part of the HOB Programme Business Case, approval was given to extend the end date of the programme from September 2021 to March 2022 to manage the now later and staged delivery of Strategic Matcher capabilities.","fyBaseline":90.6,"fyForecast":90.6,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":1006.27,"costNarrative":"Compared to financial year 19/20-Q2, the projects Baseline Whole Life Cost increased from �869.70m to �1006.27m. This is primarily due to the following factors: The WLC's have increased from the 2019/20 Q2 position as a result of additions to scope, additional funding requirements and the extension of the programme end date.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Technical & integration","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating increased from Amber to Amber/red. This is primarily due to the following factors: Over the last year the programme has made good progress on key deliverables, including the delivery of new capabilities, the decommissioning of legacy systems and…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 19/20-Q2, the project's end-date increased from 30 September 2021 to 31 March 2022 . This is primarily due to the following factors: As part of the HOB Programme Business Case, approval was given to extend the end date of the programme from September 2021 to March 2022 to manage the now later and staged delivery of Strategic Matcher capabilities.","narrativeClaimKind":null},{"id":"HO_0033_1415-Q3","year":2022,"name":"Home Office Biometrics (HOB) Programme","department":"HO","category":"ICT","description":"Home Office wide convergence programme for biometrics within Government, covering border security, law enforcement and intelligence.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 decreased from Amber/red to Amber. Following an internal review in September 2021 six recommendations were made to support programme delivery. Five of the recommendations have been completed and closed with working ongoing to complete and close the final recommendation.","startDate":"2014-04-01","endDate":"2024-09-30","scheduleNarrative":"Compared to 2021-Q4, your project end-date increased from 31 MAR 2022 to 30 SEP 2024 . This is primarily due to the following factors: The programme has successfully completed a number of key projects delivering enhanced biometrics capability for the Home Office and Law Enforcement. There have been challenges with the delivery of the Strategic Matcher project but work is ongoing to resolve these and all other aspect of Programme delivery continues as planned with some interim solutions being used.","fyBaseline":76.5,"fyForecast":76.5,"fyVariance":0.0,"varianceNarrative":"The budget variance is inferior or equal to 5%. Since the beginning of the financial year and budget setting, Strategic Matcher was subject to a further replan with a go live date beyond 21/22. This resulted in a number of milestones moving from 21/22 to 22/23 and generating a significant underspend in the current year. Additionally despite a successful cutover with the new supplier the delivery of project change work on the Immigration and Asylum Biometric System and IDENT1 has been much slower than envisaged. This has caused milestone delivery delays across numerous projects and has driven up the underspend.","wholeLifeCost":1148.0,"costNarrative":"Compared to2021-Q4, the projects Baseline Whole Life Cost increased from 1006.27 (£m) to 1147.52 (£m). This is primarily due to the following factors: The whole life programme costs include legacy systems projects, business as usual costs and Strategic projects as part of the profiled figures to ensure implementation of the programmes objectives and sustainment of biometric capabilities.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 decreased from Amber/red to Amber. Following an internal review in September 2021 six recommendations were made to support programme delivery. Five of the recommendations have been completed and closed with working ongoing to…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to 2021-Q4, your project end-date increased from 31 MAR 2022 to 30 SEP 2024 . This is primarily due to the following factors: The programme has successfully completed a number of key projects delivering enhanced biometrics capability for the Home Office and Law Enforcement. There have been challenges with the delivery of the Strategic Matcher project but work is ongoing to resolve these and all other aspect of Programme delivery continues as planned with some interim solutions being used.","narrativeClaimKind":null},{"id":"HO_0033_1415-Q3","year":2023,"name":"Home Office Biometrics (HOB) Programme","department":"HO","category":"ICT","description":"Home Office wide convergence programme for biometrics within Home Office, covering border security, law enforcement and intelligence","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. A review at the end of March 2023 delivered an Amber rating. Since the previous review all recommendations have been completed and good progress has been made in the delivery of key projects and the re-procurement to replace the strategic matcher supplier. There remain supplier challenges which could impact the programme but these are being carefully managed and addressed by the programme team to ensure delivery through 23/24 remains on track.","startDate":"2014-04-01","endDate":"2025-03-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 increased from 2024-09-30 to 2025-03-31. This is primarily due to the following factors. The programme has successfully delivered a number of key projects during 22 / 23, however the Programme end date has been impacted by challenges to the delivery of the Strategic Matcher Project, and the decision to run the delivery contract through to a conclusion in February 2023. The later end date is to provide a smooth transition to the new supplier subject detailed negotiations as part of the procurement process and accommodate the now later and staged delivery of Strategic Matcher capabilities, and ensure completion of the programmes strategic scope.","fyBaseline":85.9,"fyForecast":85.9,"fyVariance":0.0,"varianceNarrative":"The budget variance is inferior or equal to 5%. Not required as variance is less than 5%.","wholeLifeCost":1222.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 increased from 1148m. to 1222m. This is primarily due to the following factors. Challenges delivering the Strategic Matcher Project and increased costs for overall delivery, including increased costs for the new supplier for Strategic Matcher and the extension to the Programme End Date.","benefits":1002.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 1002m. The project's departmental-agree monetised benefits at 22/23-Q4 is 1002m. The HOB programme will provide significant quantified non cashable benefits. The programme is a key enabler for business areas and benefits will be directly visible to a variety of end users.","themes":["Delivery & schedule","Commercial & supply chain","Cost & funding","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. A review at the end of March 2023 delivered an Amber rating. Since the previous review all recommendations have been completed and good progress has been made in the…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 increased from 2024-09-30 to 2025-03-31. This is primarily due to the following factors. The programme has successfully delivered a number of key projects during 22 / 23, however the Programme end date has been impacted by challenges to the delivery of the Strategic Matcher Project, and the decision to run the delivery contract through to a conclusion in February 2023. The later end date is to provide a smooth transition to the new supplier subject detailed negotiations as part of the procurement process and accommodate the now later and staged delivery of Strategic Matcher capabilities, and ensure completion of the programmes strategic scope.","narrativeClaimKind":null},{"id":"HO_0033_1415-Q3","year":2024,"name":"Home Office Biometrics (HOB) Programme","department":"HO","category":"ICT","description":"Home Office wide convergence programme for biometrics within the Home Office, covering border security, law enforcement and intelligence.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 22/23-Q4, the Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber(SRO rating). This is primarily due to the following factors. The last review of the programme in March 2023 delivered an Amber rating. Since the previous review all recommendations have been completed and good progress has been made in the delivery of projects. The procurement and transition to a new supplier for Strategic Matcher has also completed. There remain supplier challenges and competing priorities which could impact the programme but these are being carefully managed and addressed by the programme team to ensure delivery through 24/25 remains on track.","startDate":"2014-04-01","endDate":"2026-03-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 increased from 2025-03-31 to 2026-03-31. This is primarily due to the following factors. The programme has made significant delivery progress during 23 / 24, including successful transition to the new Strategic Matcher supplier.","fyBaseline":95.1,"fyForecast":86.5,"fyVariance":-9.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. Not required as variance is less than 5%","wholeLifeCost":1339.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 increased from 1222m. to 1339m. This is primarily due to the following factors. Challenges delivering the Strategic Matcher project, including increased costs for overall delivery.","benefits":1131.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 2324-Q4 increased from 1002m. to 1131m. The HOB programme will provide significant quantified non cashable benefits. The programme is a key enabler for business areas and benefits will be directly visible to a variety of end users.","themes":["Delivery & schedule","Cost & funding","Commercial & supply chain","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber(SRO rating). This is primarily due to the following factors. The last review of the programme in March 2023 delivered an Amber rating. Since the previous review all recommendations have been completed and good progress has been made in the delivery…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 increased from 2025-03-31 to 2026-03-31. This is primarily due to the following factors. The programme has made significant delivery progress during 23 / 24, including successful transition to the new Strategic Matcher supplier.","narrativeClaimKind":null},{"id":"HO_0033_1415-Q3","year":2025,"name":"HOME OFFICE BIOMETRICS (HOB) PROGRAMME","department":"HO","category":"ICT","description":"Home Office Biometrics systems manage unique, digitised and verified identities formed from an individual’s biometric data. The modalities currently used are fingerprint, facial image and DNA. They provide for the fast, accurate and reliable identification of individuals critical to business operations within Immigration, Borders, Passport and Criminal Justice.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The Home Office Biometric (HOB) Programme is a complex programme that is meeting needs of a wide range of stakeholders while managing of a complex supplier landscape. In 2024/25 the programme has successfully delivered several key milestones including the Immigration and Asylum Biometric System (IABS) transitioning to the cloud.","startDate":"2014-04-01","endDate":"2026-12-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2026 to 31/12/2026. This is primarily due to the following factors‚ Earlier delivery of Strategic Matcher Stage 3 which has been bought forward to align with a Data Centre closure. This pushed Strategic Matcher Stage 2 into a later delivery at the end of 2026. The extension to the end date also allows for further IDENT1 modernisation work and ensures the Programme can complete all closure activity.","fyBaseline":89.5,"fyForecast":98.8,"fyVariance":10.39,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The 2024/25 budget allocation was lower than required due to wider portfolio pressures and decisions. The programme went into the FY with programming pressure which was higher than normal. In addition, due to dependencies on the programme such as Electronic Travel Authorisation (ETA) prioritisation, delivery of Cloud Transformation proved to be more expensive.","wholeLifeCost":1550.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 1339 to 1550. This is primarily due to the following factors‚ The increase in whole life costs is due to increased costs for project deliveries, the extension of the programme date and other year on year changes. This includes run cost increases which are driven by supplier costs and market forces.","benefits":1131.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 1131. This is primarily due to the following factors‚ Following the annual review, there have been no changes in the benefits delivered by the programme.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The Home Office Biometric (HOB) Programme is a complex programme that is meeting needs of a wide range of stakeholders while managing of a complex supplier landscape.…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2026 to 31/12/2026. This is primarily due to the following factors‚ Earlier delivery of Strategic Matcher Stage 3 which has been bought forward to align with a Data Centre closure. This pushed Strategic Matcher Stage 2 into a later delivery at the end of 2026. The extension to the end date also allows for further IDENT1 modernisation work and ensures the Programme can complete all closure activity.","narrativeClaimKind":null},{"id":"HO_0033_1415-Q3","year":2026,"name":"HOME OFFICE BIOMETRICS (HOB) PROGRAMME","department":"HO","category":"Information and Communications Technology (ICT)","description":"Home Office wide convergence programme for biometrics within Government. Home Office Biometrics systems manage unique, digitised and verified identities formed from an individual’s biometric data. The modalities currently used are fingerprint, facial image and DNA. They provide for the fast, accurate and reliable identification of individuals critical to business operations within Law enforcement, Immigration, Borders, Passport and Criminal Justice.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared with Q4 2024/25, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at Q4 2025/26 remains Amber. This reflects the complexity of the Home Office Biometrics (HOB) Programme, which continues to deliver against a broad set of stakeholder requirements within a complex supplier landscape. During 2025/26, the programme has made measurable progress, including successful delivery of key milestones such as Strategic Matcher Stage 1. While challenges remain, the programme continues to advance delivery in line with its overall objectives.","startDate":"2014-04-01","endDate":"2026-12-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same. This is primarily due to the following factors‚ delivery has remained on track and activity to transition to a Biometric Service has been progressed to plan in preparation for closure of the programme.","fyBaseline":110.04,"fyForecast":107.03,"fyVariance":2.74,"varianceNarrative":"The budget variance is less than or equal to 5%","wholeLifeCost":1809.85,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) increase from £1,561m to £1,746m. This is primarily due to the following factors: Increase in programme cost, additional year reported and increase in Business As Usual (BAU)/Live Run cost.","benefits":1309.81,"benefitsNarrative":"Compared to financial year 24/25-Q4, the programmes departmentally agreed Benefits at 25/26-Q4 increased slightly from £110m in 24/25 to £117m in 25/26. This is primarily due to an updated benefits profile, including increased benefits associated with fingerprint matching.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Governance & assurance"],"evidenceExcerpt":"Compared with Q4 2024/25, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at Q4 2025/26 remains Amber. This reflects the complexity of the Home Office Biometrics (HOB) Programme, which continues to deliver against a broad set of stakeholder requirements within a complex supplier landscape. During 2025/26, the programme has made measurable…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same. This is primarily due to the following factors‚ delivery has remained on track and activity to transition to a Biometric Service has been progressed to plan in preparation for closure of the programme.","narrativeClaimKind":null}],"previous":{"id":"HO_0033_1415-Q3","year":2025,"name":"HOME OFFICE BIOMETRICS (HOB) PROGRAMME","department":"HO","category":"ICT","description":"Home Office Biometrics systems manage unique, digitised and verified identities formed from an individual’s biometric data. The modalities currently used are fingerprint, facial image and DNA. They provide for the fast, accurate and reliable identification of individuals critical to business operations within Immigration, Borders, Passport and Criminal Justice.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The Home Office Biometric (HOB) Programme is a complex programme that is meeting needs of a wide range of stakeholders while managing of a complex supplier landscape. In 2024/25 the programme has successfully delivered several key milestones including the Immigration and Asylum Biometric System (IABS) transitioning to the cloud.","startDate":"2014-04-01","endDate":"2026-12-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2026 to 31/12/2026. This is primarily due to the following factors‚ Earlier delivery of Strategic Matcher Stage 3 which has been bought forward to align with a Data Centre closure. This pushed Strategic Matcher Stage 2 into a later delivery at the end of 2026. The extension to the end date also allows for further IDENT1 modernisation work and ensures the Programme can complete all closure activity.","fyBaseline":89.5,"fyForecast":98.8,"fyVariance":10.39,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The 2024/25 budget allocation was lower than required due to wider portfolio pressures and decisions. The programme went into the FY with programming pressure which was higher than normal. In addition, due to dependencies on the programme such as Electronic Travel Authorisation (ETA) prioritisation, delivery of Cloud Transformation proved to be more expensive.","wholeLifeCost":1550.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 1339 to 1550. This is primarily due to the following factors‚ The increase in whole life costs is due to increased costs for project deliveries, the extension of the programme date and other year on year changes. This includes run cost increases which are driven by supplier costs and market forces.","benefits":1131.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 1131. This is primarily due to the following factors‚ Following the annual review, there have been no changes in the benefits delivered by the programme.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The Home Office Biometric (HOB) Programme is a complex programme that is meeting needs of a wide range of stakeholders while managing of a complex supplier landscape.…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2026 to 31/12/2026. This is primarily due to the following factors‚ Earlier delivery of Strategic Matcher Stage 3 which has been bought forward to align with a Data Centre closure. This pushed Strategic Matcher Stage 2 into a later delivery at the end of 2026. The extension to the end date also allows for further IDENT1 modernisation work and ensures the Programme can complete all closure activity.","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":0,"attentionScore":18,"attentionReasons":["Current published delivery confidence is Amber"]},{"id":"HMRC_0017_1617-Q2","year":2026,"name":"MAKING TAX DIGITAL","department":"HMRC","category":"Information and Communications Technology (ICT)","description":"Making Tax Digital is a major transformation programme delivering whole system change to the administration of VAT and Income Tax Self-Assessment (ITSA) tax regimes that will change how millions of customers manage their taxes and interact with HMRC. MTD supports the digitisation and productivity of UK businesses in the 21st century economy. Its aim is to make it easier for businesses to get their tax right and make the calculation and payment of tax simpler through a transformed modern, digital tax service. It will change customer record keeping behaviour by requiring mandated customers to keep digital records and provide quarterly updates to HMRC. This will improve business record keeping and encourage compliant behaviour, whilst providing businesses with a modern digital experience. The MTD programme will drive digital adoption amongst the UK’s small business population to reduce error in tax and financial administration, supporting productivity and growth. It directly supports the government’s priorities to modernise the tax system, improve customer services, and to close the tax gap by raising billions in additional tax revenue to fund public services.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Amber delivery status recognises that the programme continues to navigate a challenging and complex delivery environment but remains on track to deliver successfully with robust risk mitigation plans in place. Over the last year, MTD continued to meet all key delivery and readiness milestones and a successful testing phase has further demonstrated service and operational readiness. A sustained engagement campaign has resulted in strong agent and customer awareness, and customer sign-ups are in line with forecast trajectories required to realise 26/27 benefits. The MTD Programme Board formally reviewed agreed key readiness criteria in September 2025 and January 2026, confirming the programme remained on track to go live from April 2026 with the first mandated cohort. Independent assurance has been secured through an Internal Audit review and the NISTA Gate 0/4 review. Both concluded that the programme is in a strong readiness position, with all key criteria met for go live. ​","startDate":"2016-04-01","endDate":"2029-03-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same. The programme remains on track to deliver the costed scope as set out in its current business case by March 2029.","fyBaseline":138.06,"fyForecast":137.59,"fyVariance":0.34,"varianceNarrative":"The budget variance is less than 5%.","wholeLifeCost":1484.62,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) decreased from £1,439.11m to £1,389.46m. This reflects the current scope of the programme, following some minor in year changes.","benefits":4477.49,"benefitsNarrative":"Overall programme benefits increased by £280m, driven by a combination of policy changes announced at Spring Statement and Autumn Budget 2025 (in particular those relating to Penalty Reform), revised customer costs/saving estimates, and refreshed determinants and population statistics.","themes":["Cost & funding","Governance & assurance","Delivery & schedule","Scope & requirements"],"evidenceExcerpt":"The Amber delivery status recognises that the programme continues to navigate a challenging and complex delivery environment but remains on track to deliver successfully with robust risk mitigation plans in place. Over the last year, MTD continued to meet all key delivery and readiness milestones and a successful testing phase has further demonstrated…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same. The programme remains on track to deliver the costed scope as set out in its current business case by March 2029.","narrativeClaimKind":null,"history":[{"id":"HMRC_0017_1617-Q2","year":2020,"name":"Making Tax Digital for Business","department":"HMRC","category":"ICT","description":"Delivering modernised IT to digitise tax reporting for businesses and agents and delivering a better customer experience.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber/Green, which has improved since last year�s Q2 1819 Amber/Red, due primarily to the following factors; - Increased confidence in the performance of the VAT Service. - Development of the Income Tax Self-Assessment (ITSA) service for existing customers and refinement of plans for future mandation, subject to ministerial approval. Since the Q2 1920 (30th September 2019) Amber/Green IPA DCA, the following non-project operating environment activities have impacted the original Q2 IPA DCA; - The COVID-19 (Coronavirus) pandemic and EU Transition resource are providing significant challenges in relation to programme, stakeholder and supplier resource which may impact on the successful delivery of the Programme plans which we are currently managing. Since the Q2 1920 (30th September 2019) Amber/Green IPA DCA, the following primary project actions have impacted the original Q2 IPA DCA; - No primary project actions have impacted the original Q2 IPA DCA","startDate":"2016-04-01","endDate":"2024-03-31","scheduleNarrative":"The scheduled baseline project end date at Q2 1920 (30th September 2019) is 31/03/24, has lengthened by 1096 days since last year's Q2 1819 date of 31/03/21, due primarily to the following factors; - The project end date of 31/03/21 in Q2 2018 return was based on a 5-year project implementation window which started in April 2016. Following a scope change to the programme business case approved by HM Treasury in September 2018, the project end date was revised to 31/03/23. At this stage, we were scoring 4 years of Additional Tax Revenue (ATR) savings from 2019-20 to 2022-23 in line with publicly available estimates ratified by the Office for Budget Responsibility (OBR). The OBR ratified a further year of ATR savings at Autumn Budget 2018, so we have amended the project end date to 31/03/24 in Q2 2019, in line with HM Treasury Green Book methodology. Since the Q2 1920 (30th September 2019) baseline project end date of 31/03/24, the following non-project operating environment activities have impacted the original Q2 baseline project end date; - There are no activities impacting. Since the Q2 1920 (30th September 2019) baseline project end date of 31/03/24, the following primary project actions have impacted the original Q2 baseline project end date; - There have not been any project actions impacting.","fyBaseline":75.26,"fyForecast":78.96,"fyVariance":5.0,"varianceNarrative":"The 19/20 in-year baseline / forecast variance at Q2 1920 (30th September 2019) of 5%, is due primarily to the following factors; - Increased requirement of �6.2m to complete planned deliverables in 2019/20. - HMRC business group costs reduced by �5.03m Since the Q2 1920 (30th September 2019) 19/20 in-year baseline / forecast variance of 5%, the following non-project operating environment activities have impacted the original Q2 19/20 in-year baseline / forecast variance; - Programme spending has been impacted by supplier resource constraints Since the Q2 1920 (30th September 2019) 19/20 in-year baseline / forecast variance of 5%, the following primary project actions have impacted the original Q2 19/20 in-year variance; - HMT approved an updated baseline for the programme","wholeLifeCost":402.07,"costNarrative":"The baseline Whole Life Cost at Q2 1920 (30th September 2019) is �402.07 m, has increased by �67.59 m since last year's Q2 1819 (�m) baseline Whole Life Cost of �334.48 m, due primarily to the following factors; - Programme cost increased due to higher paybill, change in delivery solution and technology efficiencies assumed during prioritisation not materialising. - Business group estimated costs updated. Since the Q2 1920 (30th September 2019) �402.07 m baseline Whole Life Cost, the following non-project operating environment activities have impacted the original baseline Q2 Whole Life Cost; - No impact from non-project operating environment activities Since the Q2 1920 (30th September 2019) �402.07 m baseline Whole Life Cost, the following primary project actions have impacted the original Q2 baseline Whole Life Cost; - Updated programme costs to take account of higher costs of manual workarounds by operational teams, change of delivery solution, and technology efficiencies assumed during prioritisation not materialising.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Workforce & capability","Approvals & decisions"],"evidenceExcerpt":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber/Green, which has improved since last year�s Q2 1819 Amber/Red, due primarily to the following factors; - Increased confidence in the performance of the VAT Service. - Development of the Income Tax Self-Assessment (ITSA) service for existing customers and…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2020","sourceLabel":"IPA Annual Report 2019-20","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The scheduled baseline project end date at Q2 1920 (30th September 2019) is 31/03/24, has lengthened by 1096 days since last year's Q2 1819 date of 31/03/21, due primarily to the following factors; - The project end date of 31/03/21 in Q2 2018 return was based on a 5-year project implementation window which started in April 2016. Following a scope change to the programme business case approved by HM Treasury in September 2018, the project end date was revised to 31/03/23. At this stage, we were scoring 4 years of Additional Tax Revenue (ATR) savings from 2019-20 to 2022-23 in line with publicly available estimates ratified by the Office for Budget Responsibility (OBR). The OBR ratified a further year of ATR savings at Autumn Budget 2018, so we have amended the project end date to 31/03/24 in Q2 2019, in line with HM Treasury Green Book methodology. Since the Q2 1920 (30th September 2019) baseline project end date of 31/03/24, the following non-project operating environment activities have impacted the original Q2 baseline project end date; - There are no activities impacting. Since the Q2 1920 (30th September 2019) baseline project end date of 31/03/24, the following primary project actions have impacted the original Q2 baseline project end date; - There have not been any project actions impacting.","narrativeClaimKind":null},{"id":"HMRC_0017_1617-Q2","year":2021,"name":"Making Tax Digital","department":"HMRC","category":"ICT","description":"Delivering modernised IT to digitise tax reporting and improve the customer experience for businesses, agents and individuals","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating increased from Amber/Green to Amber. This is primarily due to the following factors: The Delivery Confidence Assessment is Amber as the scale of Income Tax Self Assessment (ITSA) deliveries increased, delivery to a challenging plan for VAT was maintained and work was completed to legislate for Penalty Reform to harmonise penalties across tax regimes - against a back drop of churn within the programme which required recruitment exercises and subsequently the onboarding and training of new team members. Nevertheless, the MTD schedule remained on track with the ITSA pilot to be delivered on schedule, the Finance Bill (March 2021) including primary legislation for the mandation of MTD for smaller VAT businesses and the government announcing its intention to legislate for Penalty Reform in Spring Budget 2021.","startDate":"2016-04-01","endDate":"2025-03-31","scheduleNarrative":"Compared to financial year 19/20-Q2, the project's end-date increased from 31 March 2024 to 31 March 2025 . This is primarily due to the following factors: The Programme Business Case approved by HM Treasury in September 2020 extended the lifecycle of the programme to March 2025, to include scope for Income Tax Self Assessment (ITSA) mandation VAT enhancements & Penalty Reform to harmonise penalties across tax regimes","fyBaseline":121.43,"fyForecast":113.5,"fyVariance":-7.0,"varianceNarrative":"The budget variance exceeds 5%. There was an underspend in the cost requirements for Business Groups to support MTD related solution design, delivery and implementation. The assurance and forecasting processes have been improved throughout the year, improving the confidence in future Business Group requirements.","wholeLifeCost":775.73,"costNarrative":"Compared to financial year 19/20-Q2, the projects Baseline Whole Life Cost increased from �402.07m to �775.73m. This is primarily due to the following factors: The Programme's baseline whole-life cost increased from Quarter 2 of 2019-20 to reflect, the additional complexity to deliver ITSA, the identification of support line costs for VAT and the extension of the programme by an extra year. A new iteration of the Programme Business Case is in development. Once the new version of the Business Case receives HM Treasury approval, the baseline position will once again be revised to align. The project level business cases are also under construction.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating increased from Amber/Green to Amber. This is primarily due to the following factors: The Delivery Confidence Assessment is Amber as the scale of Income Tax Self Assessment (ITSA) deliveries increased, delivery to a challenging plan for VAT was…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 19/20-Q2, the project's end-date increased from 31 March 2024 to 31 March 2025 . This is primarily due to the following factors: The Programme Business Case approved by HM Treasury in September 2020 extended the lifecycle of the programme to March 2025, to include scope for Income Tax Self Assessment (ITSA) mandation VAT enhancements & Penalty Reform to harmonise penalties across tax regimes","narrativeClaimKind":null},{"id":"HMRC_0017_1617-Q2","year":2022,"name":"Making Tax Digital","department":"HMRC","category":"ICT","description":"Making Tax Digital aims to improve business record keeping providing businesses with a modern digital experience, encouraging compliant behaviour and acting as a building block to HMRC's transformation plans.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 20/21-Q4, the Delivery Confidence Assessment rating at 21/22-Q4 remained at Amber The scale of the Income Tax Self Assessment (ITSA) delivery is challenging due to its complexity, size and scope. The complexity of some VAT customer records and IT system migration challenges have resulted in Penalty Reform for VAT moving to January 2023 which was confirmed in the February 2022 Written Ministerial Statement. The Programme Director, appointed in May 2021, continues to lead Making Tax Digital Programme whilst being ably supported by his experienced Senior Leadership Team.","startDate":"2016-04-01","endDate":"2025-04-01","scheduleNarrative":"Compared to 2021-Q4, your project end-date increased from 31 MAR 2025 to 01 APR 2025 . This is primarily due to the following factors: Making Tax Digital (MTD) current scope includes Income Tax Self Assessment mandation for businesses and landlords with a turnover of £10k (excluding partnerships), VAT enhancements and Penalty Reform to harmonise penalties across tax regimes. MTD aims to support UK businesses to go digital and provide them with a modern digital experience, encouraging compliant behaviour and act as a building block to HMRC's transformation plans.","fyBaseline":150.98,"fyForecast":142.11,"fyVariance":-6.0,"varianceNarrative":"The budget variance exceeds 5%. A contingency element was included within the MTD budget allocation in 2021-22 which was not required. There was also an underspend of the cost requirements for Business Groups to support MTD related solution design, delivery and implementation. The assurance and forecasting processes have developed this year, and work continues to improve the confidence in future Business Group requirements.","wholeLifeCost":885.0,"costNarrative":"Compared to2021-Q4, the projects Baseline Whole Life Cost increased from 775.73 (£m) to 885.07 (£m). This is primarily due to the following factors: The baseline costs were increased to reflect the latest scope for the next phase of MTD across VAT, ITSA and Penalty Reform as set out in the current Programme Business Case that was signed off by HMT Treasury Approval Point in June 2021. A new iteration of the Programme Business Case is in development. Once the new version of the Business Case receives HM Treasury approval, the baseline position will be revised to align.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Approvals & decisions","Technical & integration","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Delivery Confidence Assessment rating at 21/22-Q4 remained at Amber The scale of the Income Tax Self Assessment (ITSA) delivery is challenging due to its complexity, size and scope. The complexity of some VAT customer records and IT system migration challenges have resulted in Penalty Reform for VAT moving to January…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to 2021-Q4, your project end-date increased from 31 MAR 2025 to 01 APR 2025 . This is primarily due to the following factors: Making Tax Digital (MTD) current scope includes Income Tax Self Assessment mandation for businesses and landlords with a turnover of £10k (excluding partnerships), VAT enhancements and Penalty Reform to harmonise penalties across tax regimes. MTD aims to support UK businesses to go digital and provide them with a modern digital experience, encouraging compliant behaviour and act as a building block to HMRC's transformation plans.","narrativeClaimKind":null},{"id":"HMRC_0017_1617-Q2","year":2023,"name":"Making Tax Digital","department":"HMRC","category":"ICT","description":"Making Tax Digital aims to improve business record keeping providing businesses with a modern digital experience, encouraging compliant behaviour and acting as a building block to HMRC's transformation plans.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber (IPA rating). This is primarily due to the following factors. The Income Tax Self Assessment is challenging due to its size and complexity and the Written Ministerial Statement in December 2022 confirmed the phased delivery of mandation from 2026. MTD successfully transitioned MTD for VAT to business as usual in October 2022, and Penalty Reform for VAT went live in January 2023. MTD is redesigning and streamlining its programme structure to gain better transparency of plans and co creation with software developers to achieve successful outcomes for all our customers and agents.","startDate":"2016-04-01","endDate":"2028-03-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 increased from 2025-04-01 to 2028-03-31. This is primarily due to the following factors. Making Tax Digital (MTD) current scope includes Income Tax Self Assessment mandation, VAT enhancements and Penalty Reform to harmonise penalties across tax regimes. MTD aims to support UK businesses to go digital and provide them with a modern digital experience, encouraging compliant behaviour and act as a building block to HMRCs transformation plans.","fyBaseline":153.15,"fyForecast":149.36,"fyVariance":-2.0,"varianceNarrative":"The budget variance is inferior or equal to 5%.","wholeLifeCost":885.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 remained at 885m. This is primarily due to the following factors. The baseline costs reflect the scope for MTD across VAT, ITSA and Penalty Reform as set out in the Programme Business Case that was signed off by HMT Treasury Approval Point in June 2021. A new iteration of the Programme Business Case is in development. Once the new version of the Business Case receives TAP approval, the baseline position will be revised to align.","benefits":2146.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 2146m. The project's departmentally-agreed monetised benefits at 22/23-Q4 is 2145.84m. This is due to: The benefits represent additional tax revenue and customer cost savings","themes":["Cost & funding","Approvals & decisions","Technical & integration","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber (IPA rating). This is primarily due to the following factors. The Income Tax Self Assessment is challenging due to its size and complexity and the Written Ministerial Statement in December 2022 confirmed the phased delivery of mandation from 2026.…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 increased from 2025-04-01 to 2028-03-31. This is primarily due to the following factors. Making Tax Digital (MTD) current scope includes Income Tax Self Assessment mandation, VAT enhancements and Penalty Reform to harmonise penalties across tax regimes. MTD aims to support UK businesses to go digital and provide them with a modern digital experience, encouraging compliant behaviour and act as a building block to HMRCs transformation plans.","narrativeClaimKind":null},{"id":"HMRC_0017_1617-Q2","year":2024,"name":"Making Tax Digital","department":"HMRC","category":"ICT","description":"\"Making Tax Digital aims to support UK businesses and landlords to get their VAT and Income Tax right by mandating them to keep up-to-date business records, using business accounting software that produces the VAT return or Self Assessment update to HMRC._x000D_ \"","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The Amber delivery status recognises that the programme continues to navigate a challenging and complex delivery environment. Over the last year, the programme took significant steps to improve overall delivery confidence. This included embedding a new operational model of multi-functional teams to drive delivery velocity; strengthening internal and external assurance through updated governance structures; and reinvigorating stakeholder engagement and readiness through co-design of the service._x000D_ _x000D_ The programme is taking proactive steps to mitigate these challenges. This includes developing robust contingency plans and exploring options to accelerate build, testing and migration. The programme is on track to ramp up customer volumes in the 24/25 testing period which will support the testing of critical customer journeys.","startDate":"2016-04-01","endDate":"2028-03-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2028-03-31. This is primarily due to the following factors. The programme remains on track to deliver the costed scope as set out in its current business case by March 2028.","fyBaseline":132.62,"fyForecast":124.89,"fyVariance":-6.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The underspend during the year was as a result of:_x000D_ . Baseline figures included a contingency which was not utilised as a result of the programmes adherence to delivery plans._x000D_ . Improved ways of working which has driven efficiency so that we have not needed / been required to deploy the same level of resource on the programme as we had anticipated based on prior ways of working. _x000D_ . Reduction in resource requirements for some manual workarounds due to the mitigations delivered by the programme and key stakeholders.","wholeLifeCost":1272.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 increased from 885m. to 1272m. This is primarily due to the following factors. . Revised delivery plan following Written Ministerial Statement (WMS) in December 2022 which gave consideration to lessons learned from MTD VAT with a multi release delivery for ITSA allowing for full E2E testing_x000D_ . Inclusion of an additional 2 years of costs for 2026/27 and 2027/28_x000D_ . Additional year build for VAT and subsequent impact on Penalty Reform","benefits":6278.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 2324-Q4 increased from 2146m. to 6278m. The benefits represent additional tax revenue and customer cost savings_x000D_ _x000D_ The baseline benefit update was made through a change request - this was required due to a positive bust on our 5% benefit tolerance level primarily due to a change to the Income Tax Self Assessment (ITSA) additional tax revenue (ATR) methodology (both tax gap targetable by Making Tax Digital (MTD) and revised populations for mandation due to inflationary effects) that generated over 2bn in additional ATR benefits. This has generated a significant positive uplift to the return on investment and benefits cost ratio of both MTD for ITSA and the overall programme.","themes":["Delivery & schedule","Cost & funding","Technical & integration","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The Amber delivery status recognises that the programme continues to navigate a challenging and complex delivery environment. Over the last year, the programme took…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2028-03-31. This is primarily due to the following factors. The programme remains on track to deliver the costed scope as set out in its current business case by March 2028.","narrativeClaimKind":null},{"id":"HMRC_0017_1617-Q2","year":2025,"name":"MAKING TAX DIGITAL","department":"HMRC","category":"ICT","description":"Making Tax Digital is a major transformation programme delivering whole system change to the administration of VAT and Income Tax Self-Assessment (ITSA) tax regimes that will change how millions of customers manage their taxes and interact with HMRC. MTD supports the digitisation and productivity of UK businesses in the 21st century economy. Its aim is to make it easier for businesses to get their tax right and make the calculation and payment of tax simpler through a transformed modern, digital tax service. It will change customer record keeping behaviour by requiring mandated customers to keep digital records and provide quarterly updates to HMRC. This will improve business record keeping and encourage compliant behaviour, whilst providing businesses with a modern digital experience. The MTD programme will drive digital adoption amongst the UK’s small business population to reduce error in tax and financial administration, supporting productivity and growth. It directly supports the government’s priorities to modernise the tax system, improve customer services, and to close the tax gap by raising billions in additional tax revenue to fund public services.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The Amber delivery status recognises that the programme continues to navigate a challenging and complex delivery environment, but remains on track to deliver successfully. Over the last year, the programme made significant progress and remains on track against its critical path plan. The programme completed testing of core functionality and started to ramp up customer volumes in the 24/25 testing period as planned. The public phase of testing will allow further functionality to be used in live with an increasing number and variety of customers ahead of the service going live for mandated customers from April 2026. At Autumn Budget 2024 the government confirmed their commitment to the MTD for ITSA delivery timescales, and at Spring Statement 2025, further announced: •The threshold for MTD for Income Tax will be lowered to £20k from April 2028; •A requirement for MTD customers to complete the entirety of their Self-Assessment obligations in MTD-compatible software; and •A number of deferrals and exemptions for small groups of customers. This announcement provides stakeholders certainty on most of the remaining key policy and design issues, and we will continue to work with stakeholders to address any remaining lower level questions over the coming months.","startDate":"2016-04-01","endDate":"2029-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 has moved to 31/03/2029. This is primarily due to the following factors‚ Compared to the financial year 23/24-Q4, the project's end-date at 24/25-Q4 has been moved to reflect the revised schedule completion date, which is now 31st March 2029. This follows the Business Case update, where MTD programme is now expected to hand over to Business as Usual from March 29, reflecting changes to its scope, including the inclusion of >£20k cohort from 28/29. The programme remains on track to deliver the costed scope as set out in its current business case by March 2029.","fyBaseline":125.94,"fyForecast":126.27,"fyVariance":0.26,"varianceNarrative":"The budget variance is less than or equal to 5%. In year budget variance for 2024-25 is < 0.5%","wholeLifeCost":1439.03,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 1272 to 1439. This is primarily due to the following factors‚ Since Q3 the programme has gained Treasury Approval of our updated business case, which changes our baseline to align with the business case. Departmental Baseline has increased by £166.995m from £1,272.030m to £1,439.025m following the approval of the latest MTD Programme Business Case. This business case now provides an estimate of the programme’s full lifecycle costs, including run costs through to March 2034, which were previously classified as un-costed.","benefits":4270.15,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) decreased from 6278 to 4270. This is primarily due to the following factors‚ Following Treasury Approval of our updated business case our Departmental benefit baseline has reduced by circa £2bn, due to programme scope changes and improved modelling considerations as set out in our programme Business Case v7.0. Modelling assumptions and adjustments take into consideration a major tax gap update that reduced Additional Tax Revenue (ATR), and a review of customer costs incorporated findings from businesses already signed up to MTD and external stakeholders that increased net customer costs. These modelling adjustments are likely to have contributed a significant proportion of the overall reduction in benefits. This programme still represents good value for money.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The Amber delivery status recognises that the programme continues to navigate a challenging and complex delivery environment, but remains on track to deliver…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 has moved to 31/03/2029. This is primarily due to the following factors‚ Compared to the financial year 23/24-Q4, the project's end-date at 24/25-Q4 has been moved to reflect the revised schedule completion date, which is now 31st March 2029. This follows the Business Case update, where MTD programme is now expected to hand over to Business as Usual from March 29, reflecting changes to its scope, including the inclusion of >£20k cohort from 28/29. The programme remains on track to deliver the costed scope as set out in its current business case by March 2029.","narrativeClaimKind":null},{"id":"HMRC_0017_1617-Q2","year":2026,"name":"MAKING TAX DIGITAL","department":"HMRC","category":"Information and Communications Technology (ICT)","description":"Making Tax Digital is a major transformation programme delivering whole system change to the administration of VAT and Income Tax Self-Assessment (ITSA) tax regimes that will change how millions of customers manage their taxes and interact with HMRC. MTD supports the digitisation and productivity of UK businesses in the 21st century economy. Its aim is to make it easier for businesses to get their tax right and make the calculation and payment of tax simpler through a transformed modern, digital tax service. It will change customer record keeping behaviour by requiring mandated customers to keep digital records and provide quarterly updates to HMRC. This will improve business record keeping and encourage compliant behaviour, whilst providing businesses with a modern digital experience. The MTD programme will drive digital adoption amongst the UK’s small business population to reduce error in tax and financial administration, supporting productivity and growth. It directly supports the government’s priorities to modernise the tax system, improve customer services, and to close the tax gap by raising billions in additional tax revenue to fund public services.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Amber delivery status recognises that the programme continues to navigate a challenging and complex delivery environment but remains on track to deliver successfully with robust risk mitigation plans in place. Over the last year, MTD continued to meet all key delivery and readiness milestones and a successful testing phase has further demonstrated service and operational readiness. A sustained engagement campaign has resulted in strong agent and customer awareness, and customer sign-ups are in line with forecast trajectories required to realise 26/27 benefits. The MTD Programme Board formally reviewed agreed key readiness criteria in September 2025 and January 2026, confirming the programme remained on track to go live from April 2026 with the first mandated cohort. Independent assurance has been secured through an Internal Audit review and the NISTA Gate 0/4 review. Both concluded that the programme is in a strong readiness position, with all key criteria met for go live. ​","startDate":"2016-04-01","endDate":"2029-03-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same. The programme remains on track to deliver the costed scope as set out in its current business case by March 2029.","fyBaseline":138.06,"fyForecast":137.59,"fyVariance":0.34,"varianceNarrative":"The budget variance is less than 5%.","wholeLifeCost":1484.62,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) decreased from £1,439.11m to £1,389.46m. This reflects the current scope of the programme, following some minor in year changes.","benefits":4477.49,"benefitsNarrative":"Overall programme benefits increased by £280m, driven by a combination of policy changes announced at Spring Statement and Autumn Budget 2025 (in particular those relating to Penalty Reform), revised customer costs/saving estimates, and refreshed determinants and population statistics.","themes":["Cost & funding","Governance & assurance","Delivery & schedule","Scope & requirements"],"evidenceExcerpt":"The Amber delivery status recognises that the programme continues to navigate a challenging and complex delivery environment but remains on track to deliver successfully with robust risk mitigation plans in place. Over the last year, MTD continued to meet all key delivery and readiness milestones and a successful testing phase has further demonstrated…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same. The programme remains on track to deliver the costed scope as set out in its current business case by March 2029.","narrativeClaimKind":null}],"previous":{"id":"HMRC_0017_1617-Q2","year":2025,"name":"MAKING TAX DIGITAL","department":"HMRC","category":"ICT","description":"Making Tax Digital is a major transformation programme delivering whole system change to the administration of VAT and Income Tax Self-Assessment (ITSA) tax regimes that will change how millions of customers manage their taxes and interact with HMRC. MTD supports the digitisation and productivity of UK businesses in the 21st century economy. Its aim is to make it easier for businesses to get their tax right and make the calculation and payment of tax simpler through a transformed modern, digital tax service. It will change customer record keeping behaviour by requiring mandated customers to keep digital records and provide quarterly updates to HMRC. This will improve business record keeping and encourage compliant behaviour, whilst providing businesses with a modern digital experience. The MTD programme will drive digital adoption amongst the UK’s small business population to reduce error in tax and financial administration, supporting productivity and growth. It directly supports the government’s priorities to modernise the tax system, improve customer services, and to close the tax gap by raising billions in additional tax revenue to fund public services.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The Amber delivery status recognises that the programme continues to navigate a challenging and complex delivery environment, but remains on track to deliver successfully. Over the last year, the programme made significant progress and remains on track against its critical path plan. The programme completed testing of core functionality and started to ramp up customer volumes in the 24/25 testing period as planned. The public phase of testing will allow further functionality to be used in live with an increasing number and variety of customers ahead of the service going live for mandated customers from April 2026. At Autumn Budget 2024 the government confirmed their commitment to the MTD for ITSA delivery timescales, and at Spring Statement 2025, further announced: •The threshold for MTD for Income Tax will be lowered to £20k from April 2028; •A requirement for MTD customers to complete the entirety of their Self-Assessment obligations in MTD-compatible software; and •A number of deferrals and exemptions for small groups of customers. This announcement provides stakeholders certainty on most of the remaining key policy and design issues, and we will continue to work with stakeholders to address any remaining lower level questions over the coming months.","startDate":"2016-04-01","endDate":"2029-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 has moved to 31/03/2029. This is primarily due to the following factors‚ Compared to the financial year 23/24-Q4, the project's end-date at 24/25-Q4 has been moved to reflect the revised schedule completion date, which is now 31st March 2029. This follows the Business Case update, where MTD programme is now expected to hand over to Business as Usual from March 29, reflecting changes to its scope, including the inclusion of >£20k cohort from 28/29. The programme remains on track to deliver the costed scope as set out in its current business case by March 2029.","fyBaseline":125.94,"fyForecast":126.27,"fyVariance":0.26,"varianceNarrative":"The budget variance is less than or equal to 5%. In year budget variance for 2024-25 is < 0.5%","wholeLifeCost":1439.03,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 1272 to 1439. This is primarily due to the following factors‚ Since Q3 the programme has gained Treasury Approval of our updated business case, which changes our baseline to align with the business case. Departmental Baseline has increased by £166.995m from £1,272.030m to £1,439.025m following the approval of the latest MTD Programme Business Case. This business case now provides an estimate of the programme’s full lifecycle costs, including run costs through to March 2034, which were previously classified as un-costed.","benefits":4270.15,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) decreased from 6278 to 4270. This is primarily due to the following factors‚ Following Treasury Approval of our updated business case our Departmental benefit baseline has reduced by circa £2bn, due to programme scope changes and improved modelling considerations as set out in our programme Business Case v7.0. Modelling assumptions and adjustments take into consideration a major tax gap update that reduced Additional Tax Revenue (ATR), and a review of customer costs incorporated findings from businesses already signed up to MTD and external stakeholders that increased net customer costs. These modelling adjustments are likely to have contributed a significant proportion of the overall reduction in benefits. This programme still represents good value for money.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The Amber delivery status recognises that the programme continues to navigate a challenging and complex delivery environment, but remains on track to deliver…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 has moved to 31/03/2029. This is primarily due to the following factors‚ Compared to the financial year 23/24-Q4, the project's end-date at 24/25-Q4 has been moved to reflect the revised schedule completion date, which is now 31st March 2029. This follows the Business Case update, where MTD programme is now expected to hand over to Business as Usual from March 29, reflecting changes to its scope, including the inclusion of >£20k cohort from 28/29. The programme remains on track to deliver the costed scope as set out in its current business case by March 2029.","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":0,"attentionScore":18,"attentionReasons":["Current published delivery confidence is Amber"]},{"id":"MOD_0132_2122-Q1","year":2026,"name":"MENSA","department":"MOD","category":"Military Capability","description":"MENSA is the replacement capability for assembly and disassembly of current and future nuclear warheads in support of HMG's strategic deterrent.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 2024/25-Q4, the NISTA/SRO Delivery Confidence Assessment rating at 2025/26-Q4 remained at Amber. This is primarily due to the following factors. 1. Reflects ongoing challenges and a testing supply chain environment, despite positive developments such as improved understanding of the remaining scope and cost to completion, better schedule adherence, and progress towards completing construction prior to commissioning and handover.","startDate":"2011-08-31","endDate":null,"scheduleNarrative":"Exempt under Section 24 - National security","fyBaseline":197.11,"fyForecast":202.25,"fyVariance":2.6,"varianceNarrative":"The budget variance is less than or equal to 5%","wholeLifeCost":3555.91,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 increased from £2929.600 to £2930.500. This is primarily due to the the agreed position presented by AWE at the last Financial Year and the change to a new Financial Year.","benefits":null,"benefitsNarrative":"Compared to financial year 2024/25-Q4, the project's departmental-agreed monetised benefits at 2025/26-Q4 remained at £0m.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 2024/25-Q4, the NISTA/SRO Delivery Confidence Assessment rating at 2025/26-Q4 remained at Amber. This is primarily due to the following factors. 1. Reflects ongoing challenges and a testing supply chain environment, despite positive developments such as improved understanding of the remaining scope and cost to completion, better…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 24 - National security","narrativeClaimKind":null,"history":[{"id":"MOD_0132_2122-Q1","year":2022,"name":"MENSA","department":"MOD","category":"Military Capability","description":"Exempt under Section 24 of the Freedom of Information Act 2000 (National security)","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 24 of the Freedom of Information Act 2000 (National security)","startDate":null,"endDate":null,"scheduleNarrative":"Exempt under Section 24 of the Freedom of Information Act 2000 (National security)","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 24 of the Freedom of Information Act 2000 (National security)","wholeLifeCost":null,"costNarrative":"Exempt under Section 24 of the Freedom of Information Act 2000 (National security)","benefits":null,"benefitsNarrative":"","themes":[],"evidenceExcerpt":"Exempt under Section 24 of the Freedom of Information Act 2000 (National security) Exempt under Section 24 of the Freedom of Information Act 2000 (National security)","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 24 of the Freedom of Information Act 2000 (National security)","narrativeClaimKind":null},{"id":"MOD_0132_2122-Q1","year":2023,"name":"MENSA","department":"MOD","category":"Military Capability","description":"Mensa is the replacement capability for assembly and disassembly of current and future nuclear warheads in support of HMG's strategic deterret.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 is Amber. This is primarily due to the following factors. The project has been challenged to maintain pace whilst managing a complex schedule and a testing supply chain environment. The project continues to make progress and is nearing finishing construction.","startDate":"2011-08-31","endDate":null,"scheduleNarrative":"The schedule narrative was exempt from publication in financial year 21/22-Q4. The project has been challenged to maintain pace whilst managing a complex schedule and a testing supply chain environment. The project continues to make progress and is nearing finishing construction.","fyBaseline":255.66,"fyForecast":255.66,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":2161.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 22/23-Q4 is 2161m. This is primarily due to the following factors. The programme remains affordable and is within its Approved Budgetary Limit of 2,544m. The programme continues delivering at pace, following work to ensure compliance with regulatory safety standards, and the impacts of COVID and other macro-economic pressures on the project's supply chain.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This programme does not report cashable benefits. Its aim is to provision the armed forces with the equipment and / or infrastructure required.","themes":["Delivery & schedule","Cost & funding","Commercial & supply chain","Technical & integration"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 is Amber. This is primarily due to the following factors. The project has been challenged to maintain pace whilst managing a complex schedule and a testing supply chain environment. The project continues to make progress and is nearing finishing construction. The…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The schedule narrative was exempt from publication in financial year 21/22-Q4. The project has been challenged to maintain pace whilst managing a complex schedule and a testing supply chain environment. The project continues to make progress and is nearing finishing construction.","narrativeClaimKind":null},{"id":"MOD_0132_2122-Q1","year":2024,"name":"MENSA","department":"MOD","category":"Military Capability","description":"MENSA is the replacement capability for assembly and disassembly of current and future nuclear warheads in support of HMG's strategic deterrent.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure and Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The project has been challenged to maintain pace whilst managing a complex schedule and a testing supply chain environment. The project continues to make progress and is nearing finishing construction.","startDate":"2011-08-31","endDate":null,"scheduleNarrative":"The project has been challenged to maintain pace whilst managing a complex schedule and a testing supply chain environment. The project continues to make progress and is nearing the completion of construction.","fyBaseline":268.6,"fyForecast":230.41,"fyVariance":-14.218,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. Completing a commercial reset to address supply chain performance took longer than anticipated due to legal and commercial complexities, with schedule adherence still an issue for the project.","wholeLifeCost":2744.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 increased from 2161m to 2744m. This is primarily due to the following factors. Prolongation associated with the projects complexity and interdependencies between supply chain partners, as well as supply chain performance, capability and capacity. The project remains affordable and within its Whole Life Costs budget.","benefits":0.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 0m.","themes":["Delivery & schedule","Commercial & supply chain","Cost & funding","Technical & integration"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure and Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The project has been challenged to maintain pace whilst managing a complex schedule and a testing supply chain environment. The project continues to make progress…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project has been challenged to maintain pace whilst managing a complex schedule and a testing supply chain environment. The project continues to make progress and is nearing the completion of construction.","narrativeClaimKind":null},{"id":"MOD_0132_2122-Q1","year":2025,"name":"MENSA","department":"MoD","category":"Military Capability","description":"MENSA is the replacement capability for assembly and disassembly of current and future nuclear warheads in support of the UK's strategic deterrent.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. The programme continuing to improve its understanding of the remaining scope and cost to completion, improvement of schedule adherence and progress towards finishing construction before commissioning and handover.","startDate":"2011-08-31","endDate":null,"scheduleNarrative":"Section 24 - National security","fyBaseline":219.7,"fyForecast":219.7,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":2929.6,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 2744 to 2929. This is primarily due to the following factors. An uplift in budget to £2929.6M has been approved to enable the project to continue delivering in the face of increasing material and labour costs.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits","themes":["Cost & funding","Delivery & schedule","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. The programme continuing to improve its understanding of the remaining scope and cost to completion, improvement of schedule adherence and progress towards finishing construction before commissioning…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Section 24 - National security","narrativeClaimKind":null},{"id":"MOD_0132_2122-Q1","year":2026,"name":"MENSA","department":"MOD","category":"Military Capability","description":"MENSA is the replacement capability for assembly and disassembly of current and future nuclear warheads in support of HMG's strategic deterrent.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 2024/25-Q4, the NISTA/SRO Delivery Confidence Assessment rating at 2025/26-Q4 remained at Amber. This is primarily due to the following factors. 1. Reflects ongoing challenges and a testing supply chain environment, despite positive developments such as improved understanding of the remaining scope and cost to completion, better schedule adherence, and progress towards completing construction prior to commissioning and handover.","startDate":"2011-08-31","endDate":null,"scheduleNarrative":"Exempt under Section 24 - National security","fyBaseline":197.11,"fyForecast":202.25,"fyVariance":2.6,"varianceNarrative":"The budget variance is less than or equal to 5%","wholeLifeCost":3555.91,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 increased from £2929.600 to £2930.500. This is primarily due to the the agreed position presented by AWE at the last Financial Year and the change to a new Financial Year.","benefits":null,"benefitsNarrative":"Compared to financial year 2024/25-Q4, the project's departmental-agreed monetised benefits at 2025/26-Q4 remained at £0m.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 2024/25-Q4, the NISTA/SRO Delivery Confidence Assessment rating at 2025/26-Q4 remained at Amber. This is primarily due to the following factors. 1. Reflects ongoing challenges and a testing supply chain environment, despite positive developments such as improved understanding of the remaining scope and cost to completion, better…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 24 - National security","narrativeClaimKind":null}],"previous":{"id":"MOD_0132_2122-Q1","year":2025,"name":"MENSA","department":"MoD","category":"Military Capability","description":"MENSA is the replacement capability for assembly and disassembly of current and future nuclear warheads in support of the UK's strategic deterrent.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. The programme continuing to improve its understanding of the remaining scope and cost to completion, improvement of schedule adherence and progress towards finishing construction before commissioning and handover.","startDate":"2011-08-31","endDate":null,"scheduleNarrative":"Section 24 - National security","fyBaseline":219.7,"fyForecast":219.7,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":2929.6,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 2744 to 2929. This is primarily due to the following factors. An uplift in budget to £2929.6M has been approved to enable the project to continue delivering in the face of increasing material and labour costs.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits","themes":["Cost & funding","Delivery & schedule","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. The programme continuing to improve its understanding of the remaining scope and cost to completion, improvement of schedule adherence and progress towards finishing construction before commissioning…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Section 24 - National security","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":null,"attentionScore":18,"attentionReasons":["Current published delivery confidence is Amber"]},{"id":"DFT_0043_2021-Q2","year":2026,"name":"MIDLANDS RAIL HUB","department":"DFT","category":"Infrastructure and Construction","description":"The Midlands Rail Hub programme will improve connectivity between South Wales, the South-west of England, the West and East Midlands, by delivering additional rail capacity into central Birmingham, to promote growth in the regional Midlands economies. At its heart are two new chords at Bordesley which enable new connections into Moor Street and relieve the congested New Street. The programme will be progressed in multiple phases, with the first (the West and Central scope, for improved services between Birmingham, to the South West, Cardiff, and Worcester) currently in detailed design, and later phases (between the West and East Midlands and extending Worcester services to Hereford) in earlier stages of development.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24-25-Q4, the NISTA Delivery Confidence Assessment rating at 25/26-Q4 remained at AMBER. This is due to the following factors: the confirmation by the Chancellor of funding to progress the next stage of Midlands Rail Hub at the 2025 Spending Review, and Network Rail’s recent appointment and mobilisation of the Alliance contractor who will design and build the Western scope, represent a significant step forward for the programme. However, we continue to manage a number of significant risks, including affordability of operational expenditure and rolling stock choices, as well as new potential risks associated with the proposed transfer of MRH sponsorship from DfT into Network Rail. We are also continuing to examine the value for money and affordability of accelerating delivery and progressing the Eastern and Hereford scope.","startDate":"2017-04-01","endDate":"2040-12-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained at 31/12/2040. This is primarily due to the following factors‚ The West Scope is on-track to be in service in the early 2030s. Development of later phases of the scheme, to the East Midlands and between Worcester and Hereford, is continuing and will be used to inform future investment decisions.","fyBaseline":6.7,"fyForecast":6.7,"fyVariance":0.0,"varianceNarrative":"The budget variance is within 5% for this financial year.","wholeLifeCost":948.37,"costNarrative":"Compared to financial year 24/25 the project’s departmental agreed Whole Life Cost from FY 24/25-Q4 (measured in £m) has not changed at 1569. The Whole Life Costs for the Programme are being reviewed as part of an updated business case for the whole programme.","benefits":1938.6,"benefitsNarrative":"Compared to financial year 24/25 the project’s departmental agreed Benefits from FY 24/25-Q4 (measured in £m) has not changed at 1817. The Benefits for the Programme are being reviewed as part of an updated business case for the whole programme.","themes":["Cost & funding","Scope & requirements","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 24-25-Q4, the NISTA Delivery Confidence Assessment rating at 25/26-Q4 remained at AMBER. This is due to the following factors: the confirmation by the Chancellor of funding to progress the next stage of Midlands Rail Hub at the 2025 Spending Review, and Network Rail’s recent appointment and mobilisation of the Alliance contractor…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained at 31/12/2040. This is primarily due to the following factors‚ The West Scope is on-track to be in service in the early 2030s. Development of later phases of the scheme, to the East Midlands and between Worcester and Hereford, is continuing and will be used to inform future investment decisions.","narrativeClaimKind":null,"history":[{"id":"DFT_0043_2021-Q2","year":2021,"name":"Midlands Rail Hub","department":"DFT","category":"Infrastructure and Construction","description":"Midlands Rail Hub has three strategic aims: to support the growth of the Midlands economy through better connections between the economic centres of Birmingham, Leicester and Nottingham. To make the most of the opportunities of the Integrated Rail Plan/HS2 and allow up to 10 additional trains (in each direction) to serve Central Birmingham. Up to 20 proposal are being examined across the region, but the centre piece of the scheme are two chords (connecting the Camp Hill Line to the Snow Hill Line) at Bordesley in Central Birmingham. This would allow trains that currently serve New Street to be diverted to Moor Street and Snow Hill stations, providing new journey opportunities and a convenient interchange with HS2's Curzon Street Station (via Moor Street). The scheme was a 2019 manifesto commitment and remains a key priority. Several elements of the Western Corridor (including Kings Norton - Barnt Green and Snow Hill Platform 4) are \"Project Speed\" candidates for acceleration and early delivery.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber.This is primarily due to the following factors: The project team are currently considering the impact of the Integrated Rail Plan on the Eastern Corridor. This is likely to result in a changes to the scope to if there are changes to HS2 routing and station options in the East Midlands. Consequently, the Outline Business Case is being developed in two parts so as to not slow down development of the South Western Corridor. A land acquisition strategy is being formulated, and proposal for possible early acquisition of land and being drawn up.","startDate":"2017-04-01","endDate":"2033-06-30","scheduleNarrative":"The project end-date is 30 June 2033. This is primarily due to the following factors: We are seeking to better the delivery date of the Outline Business Case (OBC) from the current forecast. Because of uncertainty around the Eastern Corridor as a result of Integrated Rail Plan, development work has been prioritised on the South West Corridor and we are expecting delivery of the South West Corridor OBC in Q4 2022. The East Corridor OBC will follow in Q1 2023. We are seeking to improve even the revised delivery dates. Two elements of the scheme, platform 4 at Snow Hill Station and Kings Norton interventions, are being accelerated as part of Project Speed and we expect Network Rail to complete OBCs for these schemes before the end of 2022. Further acceleration from even these dates is being considered.","fyBaseline":5.82,"fyForecast":1.39,"fyVariance":-76.0,"varianceNarrative":"The budget variance exceeds 5%. Project spend is within 1% of the forecast in the revised budget that was change controlled following the delayed start to the project. This was due to an unexpected elongation of the governance process, and challenges regarding Network Rail's internal procurement processes, which has necessitated an external tender for third-party technical advisors to deliver the works.","wholeLifeCost":1562.54,"costNarrative":"The projects Baseline Whole Life Cost is �1562.54m. This is primarily due to the following factors: The whole life cost is based on the capital costs of delivery of up to 20 interventions across the Midlands, and includes two major infrastructure interventions in central Birmingham. They require land acquisition and pose considerable civil engineering and construction challenges. The Bordesley East and West Chords make up approximately 50% of the total Anticipated Final Cost (AFC) depending on whether Bordesley viaduct needs to be widened. As the scheme is in the initial stages of Outline Business Case development, there is still considerable uncertainty as to the AFC, which is why it is expressed as a range with a considerable risk allowance. Furthermore, it should be noted that it is likely to be delivered in phases over several control periods.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber.This is primarily due to the following factors: The project team are currently considering the impact of the Integrated Rail Plan on the Eastern Corridor. This is likely to result in a changes to the scope to if there are changes to HS2 routing and station options in the…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project end-date is 30 June 2033. This is primarily due to the following factors: We are seeking to better the delivery date of the Outline Business Case (OBC) from the current forecast. Because of uncertainty around the Eastern Corridor as a result of Integrated Rail Plan, development work has been prioritised on the South West Corridor and we are expecting delivery of the South West Corridor OBC in Q4 2022. The East Corridor OBC will follow in Q1 2023. We are seeking to improve even the revised delivery dates. Two elements of the scheme, platform 4 at Snow Hill Station and Kings Norton interventions, are being accelerated as part of Project Speed and we expect Network Rail to complete OBCs for these schemes before the end of 2022. Further acceleration from even these dates is being considered.","narrativeClaimKind":null},{"id":"DFT_0043_2021-Q2","year":2022,"name":"Midlands Rail Hub","department":"DFT","category":"Infrastructure and Construction","description":"Following publication of the Integrated Rail Plan, Midlands Rail Hub will focus on bringing additional services into Central Birmingham from the south west. This will allow more people to benefit from HS2 by providing a convenient interchange the new station at Curzon Street, improved local services in Birmingham and provide capacity for additional Bristol and Cardiff trains.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 remained at Amber. We remain confident that the Outline Business Case for the programme will be delivered in October 2022. In the next quarter the programme scope will be aligned with the Integrated Rail Plan but will retain the ability to deliver the eastern elements of the scheme if funding is available.","startDate":"2017-04-01","endDate":"2033-06-30","scheduleNarrative":"Compared to 2021-Q4, your project end-date remained scheduled to finish on 30 JUN 2033 . This is primarily due to the following factors: The OBC for the programme will be delivered in October 2022. There is no reason to suggest that the entire programme cannot be delivered by June 2033.","fyBaseline":9.26,"fyForecast":1.43,"fyVariance":-89.0,"varianceNarrative":"While the yearly spend varies from the original baseline, the actual spend is in line with the current programme (set out in the change control from October 2021). Project spend for the OBC is in line with current forecasts and it is expected that the project will utilise all allocated funding.","wholeLifeCost":1563.0,"costNarrative":"Compared to2021-Q4, the projects Baseline Whole Life Cost increased from 1562.54 (£m) to 1562.55 (£m). This is primarily due to the following factors: Whole life costs are in line with programme forecasts. This will be updated as part of the OBC.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Scope & requirements","Approvals & decisions","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 remained at Amber. We remain confident that the Outline Business Case for the programme will be delivered in October 2022. In the next quarter the programme scope will be aligned with the Integrated Rail Plan but will retain the…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to 2021-Q4, your project end-date remained scheduled to finish on 30 JUN 2033 . This is primarily due to the following factors: The OBC for the programme will be delivered in October 2022. There is no reason to suggest that the entire programme cannot be delivered by June 2033.","narrativeClaimKind":null},{"id":"DFT_0043_2021-Q2","year":2023,"name":"Midlands Rail Hub","department":"DFT","category":"Infrastructure and Construction","description":"The Outline Business Case for Midlands Rail Hubs West and Central scope was received in November 2022, and it is progressing through assurance and governance to support a Decision to Design. Following the IPAs review in February 2023, we are working with Network Rail and Midlands Connect to ensure full separability of the programmes scope.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. Midlands Rail Hub was subject to an IPA Gate 0 review in February 2023, and received an Amber rating. The review recommended clarifying the Departments objectives for investment, scope separability, resources, and governance. The project team is addressing the recommendations, and we intend to present the Decision to Design to the Investment Portfolio and Delivery Committee in June.","startDate":"2017-04-01","endDate":"2033-06-30","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2033-06-30. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2033-06-30. This is primarily due to the following factors. The November 2022 OBC forecasts entry into service of Midlands Rail Hub in December 2030. While this may change during further development of the scheme, there is no reason at present why this cant be achieved.","fyBaseline":7.31,"fyForecast":3.35,"fyVariance":-54.0,"varianceNarrative":"The project is currently well within budget and there is no obvious reason why this will be exceeded.","wholeLifeCost":1563.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 remained at 1563m. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 remained at 1563m. This is primarily due to the following factors.","benefits":1817.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 1817m.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. Midlands Rail Hub was subject to an IPA Gate 0 review in February 2023, and received an Amber rating. The review recommended clarifying the Departments objectives for…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2033-06-30. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2033-06-30. This is primarily due to the following factors. The November 2022 OBC forecasts entry into service of Midlands Rail Hub in December 2030. While this may change during further development of the scheme, there is no reason at present why this cant be achieved.","narrativeClaimKind":null},{"id":"DFT_0043_2021-Q2","year":2024,"name":"Midlands Rail Hub","department":"DFT","category":"Infrastructure and Construction","description":"The Midlands Rail Hub programme will improve connectivity between South Wales, the South-west of England, the West and East Midlands, by delivering additional rail capacity into central Birmingham, to promote growth in the regional Midlands economies. At its heart is the provision of new connections into Moor Street station and relieving the congested New Street station. The programme will be progressed in multiple phases, with the first (the West and Central scope, for improved services between Birmingham, Bristol, Cardiff, and Worcester) currently in detailed design, and later phases (between the West and East Midlands, and extending Worcester services to Hereford) in earlier stages of development.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The design of the West to Worcester, and Central, scope has now been remitted to Network Rail, who are well advanced in procuring a contractor for the detailed design work. We are working towards a programme-wide OBC which will further develop the proposals for the rest of the programme, including improvements between the East and West Midlands, and between Worcester and Hereford.","startDate":"2017-04-01","endDate":"2040-12-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 increased from 2033-06-30 to 2040-12-31. This is primarily due to the following factors. The West to Worcester, and Central, scope remains on track and could be complete by the early 2030s, while other scope is at an earlier stage of development and subject to future decisions.","fyBaseline":7.3,"fyForecast":7.31,"fyVariance":0.0,"varianceNarrative":"The budget variance is inferior or equal to 5%.","wholeLifeCost":1569.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 increased from 1563m. to 1569m. This is primarily due to the following factors. The Whole Life Costs will be reviewed as part of the programme-wide OBC.","benefits":1817.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 1817m.","themes":["Cost & funding","Scope & requirements","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The design of the West to Worcester, and Central, scope has now been remitted to Network Rail, who are well advanced in procuring a contractor for the detailed design…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 increased from 2033-06-30 to 2040-12-31. This is primarily due to the following factors. The West to Worcester, and Central, scope remains on track and could be complete by the early 2030s, while other scope is at an earlier stage of development and subject to future decisions.","narrativeClaimKind":null},{"id":"DFT_0043_2021-Q2","year":2025,"name":"MIDLANDS RAIL HUB","department":"DfT","category":"Infrastructure and Construction","description":"The Midlands Rail Hub programme will improve connectivity between South Wales, the South-west of England, the West and East Midlands, by delivering additional rail capacity into central Birmingham, to promote growth in the regional Midlands economies. At its heart are two new chords at Bordesley which enable new connections into Moor Street and relieve the congested New Street. The programme will be progressed in multiple phases, with the first (the West and Central scope, for improved services between Birmingham, Bristol, Cardiff, and Worcester) currently in detailed design, and later phases (between the West and East Midlands, and extending Worcester services to Hereford) in earlier stages of development.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Prior to the conclusion of the Spending Review, uncertainty about available funding and Government support for the West scope led to the procurement of a design and delivery contractor being paused. We are working with Network Rail to minimise the impacts of any delay to delivery. A programme-wide Outline Business Case, which strengthens the strategic and economic rationale for the scheme, is well advanced and will be used to inform future decisions about the Eastern scope.","startDate":"2017-04-01","endDate":"2040-12-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/12/2040. This is primarily due to the following factors‚ The West Scope is on-track to be in service in the early 2030s. Development of later phases of the scheme, to the East Midlands and between Worcester and Hereford, is continuing and will be used to inform future investment decisions.","fyBaseline":5.13,"fyForecast":4.65,"fyVariance":9.36,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ Early development work was replanned to accommodate in-year 2024/25 funding pressures following the first phase of the Spending Review.","wholeLifeCost":1569.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 1569. This is primarily due to the following factors‚ There was no change in the expected costs of the Programme in 2024/25.","benefits":1817.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 1817. This is primarily due to the following factors‚ There was no change to the expected benefits of the Programme in 2024/25.","themes":["Cost & funding","Delivery & schedule","Scope & requirements","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Prior to the conclusion of the Spending Review, uncertainty about available funding and Government support for the West scope led to the procurement of a design and…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/12/2040. This is primarily due to the following factors‚ The West Scope is on-track to be in service in the early 2030s. Development of later phases of the scheme, to the East Midlands and between Worcester and Hereford, is continuing and will be used to inform future investment decisions.","narrativeClaimKind":null},{"id":"DFT_0043_2021-Q2","year":2026,"name":"MIDLANDS RAIL HUB","department":"DFT","category":"Infrastructure and Construction","description":"The Midlands Rail Hub programme will improve connectivity between South Wales, the South-west of England, the West and East Midlands, by delivering additional rail capacity into central Birmingham, to promote growth in the regional Midlands economies. At its heart are two new chords at Bordesley which enable new connections into Moor Street and relieve the congested New Street. The programme will be progressed in multiple phases, with the first (the West and Central scope, for improved services between Birmingham, to the South West, Cardiff, and Worcester) currently in detailed design, and later phases (between the West and East Midlands and extending Worcester services to Hereford) in earlier stages of development.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24-25-Q4, the NISTA Delivery Confidence Assessment rating at 25/26-Q4 remained at AMBER. This is due to the following factors: the confirmation by the Chancellor of funding to progress the next stage of Midlands Rail Hub at the 2025 Spending Review, and Network Rail’s recent appointment and mobilisation of the Alliance contractor who will design and build the Western scope, represent a significant step forward for the programme. However, we continue to manage a number of significant risks, including affordability of operational expenditure and rolling stock choices, as well as new potential risks associated with the proposed transfer of MRH sponsorship from DfT into Network Rail. We are also continuing to examine the value for money and affordability of accelerating delivery and progressing the Eastern and Hereford scope.","startDate":"2017-04-01","endDate":"2040-12-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained at 31/12/2040. This is primarily due to the following factors‚ The West Scope is on-track to be in service in the early 2030s. Development of later phases of the scheme, to the East Midlands and between Worcester and Hereford, is continuing and will be used to inform future investment decisions.","fyBaseline":6.7,"fyForecast":6.7,"fyVariance":0.0,"varianceNarrative":"The budget variance is within 5% for this financial year.","wholeLifeCost":948.37,"costNarrative":"Compared to financial year 24/25 the project’s departmental agreed Whole Life Cost from FY 24/25-Q4 (measured in £m) has not changed at 1569. The Whole Life Costs for the Programme are being reviewed as part of an updated business case for the whole programme.","benefits":1938.6,"benefitsNarrative":"Compared to financial year 24/25 the project’s departmental agreed Benefits from FY 24/25-Q4 (measured in £m) has not changed at 1817. The Benefits for the Programme are being reviewed as part of an updated business case for the whole programme.","themes":["Cost & funding","Scope & requirements","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 24-25-Q4, the NISTA Delivery Confidence Assessment rating at 25/26-Q4 remained at AMBER. This is due to the following factors: the confirmation by the Chancellor of funding to progress the next stage of Midlands Rail Hub at the 2025 Spending Review, and Network Rail’s recent appointment and mobilisation of the Alliance contractor…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained at 31/12/2040. This is primarily due to the following factors‚ The West Scope is on-track to be in service in the early 2030s. Development of later phases of the scheme, to the East Midlands and between Worcester and Hereford, is continuing and will be used to inform future investment decisions.","narrativeClaimKind":null}],"previous":{"id":"DFT_0043_2021-Q2","year":2025,"name":"MIDLANDS RAIL HUB","department":"DfT","category":"Infrastructure and Construction","description":"The Midlands Rail Hub programme will improve connectivity between South Wales, the South-west of England, the West and East Midlands, by delivering additional rail capacity into central Birmingham, to promote growth in the regional Midlands economies. At its heart are two new chords at Bordesley which enable new connections into Moor Street and relieve the congested New Street. The programme will be progressed in multiple phases, with the first (the West and Central scope, for improved services between Birmingham, Bristol, Cardiff, and Worcester) currently in detailed design, and later phases (between the West and East Midlands, and extending Worcester services to Hereford) in earlier stages of development.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Prior to the conclusion of the Spending Review, uncertainty about available funding and Government support for the West scope led to the procurement of a design and delivery contractor being paused. We are working with Network Rail to minimise the impacts of any delay to delivery. A programme-wide Outline Business Case, which strengthens the strategic and economic rationale for the scheme, is well advanced and will be used to inform future decisions about the Eastern scope.","startDate":"2017-04-01","endDate":"2040-12-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/12/2040. This is primarily due to the following factors‚ The West Scope is on-track to be in service in the early 2030s. Development of later phases of the scheme, to the East Midlands and between Worcester and Hereford, is continuing and will be used to inform future investment decisions.","fyBaseline":5.13,"fyForecast":4.65,"fyVariance":9.36,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ Early development work was replanned to accommodate in-year 2024/25 funding pressures following the first phase of the Spending Review.","wholeLifeCost":1569.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 1569. This is primarily due to the following factors‚ There was no change in the expected costs of the Programme in 2024/25.","benefits":1817.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 1817. This is primarily due to the following factors‚ There was no change to the expected benefits of the Programme in 2024/25.","themes":["Cost & funding","Delivery & schedule","Scope & requirements","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Prior to the conclusion of the Spending Review, uncertainty about available funding and Government support for the West scope led to the procurement of a design and…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/12/2040. This is primarily due to the following factors‚ The West Scope is on-track to be in service in the early 2030s. Development of later phases of the scheme, to the East Midlands and between Worcester and Hereford, is continuing and will be used to inform future investment decisions.","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":0,"attentionScore":18,"attentionReasons":["Current published delivery confidence is Amber"]},{"id":"DEFRA_0013_2021-Q4","year":2026,"name":"NATURE FOR CLIMATE FUND","department":"DEFRA","category":"Infrastructure and Construction","description":"To support the government’s ambitions for net zero and environmental improvement, Defra established the five-year Nature for Climate Fund Programme to increase tree planting and restore peatland in England. Between 2024‑25, the Programme directly planted 7,162 hectares of tree planting (95% of the annual target). Up to 2024-25 the programme directly funded 23,526 hectares of peatland restoration (67% of the annual target), contributing to total national delivery of 21,186 hectares of tree planting and 26,426 hectares of peatland restoration over the period. The Programme was extended into 2025‑26, with peatland grants extended to 2026‑27, while Defra considers future delivery and funding arrangements. The new Trees Programme (non GMPP) is expected to reach completion in 2030.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 2024‑25 Q4, the SRO Delivery Confidence Assessment (DCA) rating at 2025‑26 Q4 decreased to Amber. This reflects a combination of near‑term delivery pressures and pipeline risks, despite strong historical performance and a positive long‑term outlook. Official statistics for 2024‑25 showed a significant year‑on‑year increase in tree planting, with 7,164 hectares delivered in England, the highest annual rate in over 20 years, demonstrating the Programme’s ability to scale delivery. Delivery confidence for 2025‑26 has reduced due to a contraction in the tree planting pipeline since Q3, driven by lower expected output from England Woodland Creation Offer and the Community Forests and weather‑related impacts earlier in the season. Uncertainty over funding going into the final year of delivery will also have impacted the tree planting pipeline This has resulted in forecast delivery of around ~6000ha for the year. Mitigations are in place, including strengthened resourcing, organisational restructuring and the transition to the successor Trees Programme, supported by an approved business case. The rating reflects short‑term uncertainty while longer‑term delivery confidence remains strong, underpinned by improved capability, new funding mechanisms and a clear delivery pathway.","startDate":"2020-04-01","endDate":null,"scheduleNarrative":"Compared to financial year 2024‑25 Q4, the project’s end‑date at 2025‑26 Q4 remained the same, following a one‑year extension that was agreed to enable the design and mobilisation of the successor Trees Programme. The extension provided additional time to put in place future delivery arrangements and secure the necessary approvals, while maintaining continuity of activity. The programme closed at the end of March 2026, with key transition milestones on track and no further changes to the end‑date anticipated.","fyBaseline":255.2,"fyForecast":255.2,"fyVariance":0.0,"varianceNarrative":"The budget variance exceeds 5% by a small margin. This is primarily due to the following factors. The overall NCF Programme for 2025/26 is currently forecasting an underspend of £11.45m, representing a 5.55% variance against the agreed Financial Year baseline (inclusive of a £5.9m Defra underspend). This position remains indicative and subject to minor change as final outturn information is confirmed with ALB delivery partners and wider Defra teams. The majority of the variance relates to CDEL, which is forecast to underspend by £11.23m (6.36% under budget). This reflects slower-than-anticipated delivery across parts of the capital Programme during the year. RDEL performance remained broadly on track. Administration expenditure is forecast to be 0.89% under budget, while Programme expenditure is forecast to underspend by £0.22m (0.74%).","wholeLifeCost":1272.06,"costNarrative":"Compared to financial year 24/25‑Q4, the project’s departmentally agreed Whole Life Cost at 25/26‑Q4 increased to £176.52m CDEL and £29.88m RDEL. This increase is due to an agreed extension to the Programme to allow for the development and transition to a successor Programme. The increase in Whole Life Costs reflects the extended duration of the Programme rather than any change in scope or increase in cost per unit, with underlying delivery costs and assumptions remaining unchanged.","benefits":30171.62,"benefitsNarrative":"Compared to financial year 24/25‑Q4, the project’s departmentally agreed Benefits at 25/26‑Q4 remained unchanged. This is because the agreed outcomes, scope, and benefits methodology have not changed following the Programme extension, which was agreed to allow for the development of a successor Programme. The extension impacts the duration of delivery rather than the nature or scale of benefits, and no new evidence or methodological changes have been introduced that would materially affect the benefits valuation.","themes":["Cost & funding","Delivery & schedule","Scope & requirements","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 2024‑25 Q4, the SRO Delivery Confidence Assessment (DCA) rating at 2025‑26 Q4 decreased to Amber. This reflects a combination of near‑term delivery pressures and pipeline risks, despite strong historical performance and a positive long‑term outlook. Official statistics for 2024‑25 showed a significant year‑on‑year increase in tree…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 2024‑25 Q4, the project’s end‑date at 2025‑26 Q4 remained the same, following a one‑year extension that was agreed to enable the design and mobilisation of the successor Trees Programme. The extension provided additional time to put in place future delivery arrangements and secure the necessary approvals, while maintaining continuity of activity. The programme closed at the end of March 2026, with key transition milestones on track and no further changes to the end‑date anticipated.","narrativeClaimKind":null,"history":[{"id":"DEFRA_0013_2021-Q4","year":2021,"name":"Nature for Climate Fund","department":"DEFRA","category":"Infrastructure and Construction","description":"The Nature for Climate Fund Programme has been established to significantly increase tree planting, woodland creation and management, and peatland restoration, in England to support the delivery of Net Zero and 25-Year Environment Plan commitments. The programme is also designed to deliver wider social, economic and environmental benefits.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber/red.This is primarily due to the following factors: The Nature for Climate Fund was established in 2020/21. Significant progress has been made to establish the programme in 2020/21 and to start delivery against the programme's ambitious objectives. The programme has accepted all recommendations that were made by the IPA following reviews in the second half of 2020 and made significant progress in addressing these recommendations. This has included ensuring that the programme has the correct resources, capabilities and governance in place to support effective delivery.","startDate":"2020-04-01","endDate":"2025-03-31","scheduleNarrative":"The project end-date is 31 March 2025. This is primarily due to the following factors: The schedule of the programme positions the Nature for Climate Fund programme well for delivery against its ambitious targets. Delivery has already successfully begun in 2020/21 (year 1 of the programme) and 2020/21 has also seen significant work to establish programme structures that will support successful delivery in years 2-5, with significant ramping up of delivery from year 2 onwards.","fyBaseline":52.72,"fyForecast":52.72,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":756.36,"costNarrative":"The projects Baseline Whole Life Cost is �756.36m. This is primarily due to the following factors: �640M of expected capital funding for the Nature for Climate Fund was announced as part of the Budget in March 2020. Only the 2021-22 financial year was scored at the 2020 Spending Review meaning future years funding is subject to approval through subsequent Spending Reviews.","benefits":null,"benefitsNarrative":"","themes":["Delivery & schedule","Cost & funding","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber/red.This is primarily due to the following factors: The Nature for Climate Fund was established in 2020/21. Significant progress has been made to establish the programme in 2020/21 and to start delivery against the programme's ambitious objectives. The programme has…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project end-date is 31 March 2025. This is primarily due to the following factors: The schedule of the programme positions the Nature for Climate Fund programme well for delivery against its ambitious targets. Delivery has already successfully begun in 2020/21 (year 1 of the programme) and 2020/21 has also seen significant work to establish programme structures that will support successful delivery in years 2-5, with significant ramping up of delivery from year 2 onwards.","narrativeClaimKind":null},{"id":"DEFRA_0013_2021-Q4","year":2022,"name":"Nature for Climate Fund","department":"DEFRA","category":"Infrastructure and Construction","description":"The Nature for Climate Fund Programme has been established to significantly increase tree planting, woodland creation and management, and peatland restoration, in England to support the delivery of Net Zero and 25-Year Environment Plan commitments. The programme is also designed to deliver wider social, economic and environmental benefits.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 decreased from Amber/red to Amber Significant progress has been made to establish the programme and to begin delivery against the programme's ambitious objectives. The programme has accepted all recommendations that were made by the IPA following reviews in 2020 and 2021 and has made significant progress in addressing these recommendations. This has included ensuring that the programme has the correct resources, capabilities and governance in place to support effective delivery.","startDate":"2020-04-01","endDate":"2025-03-31","scheduleNarrative":"Compared to 2021-Q4, your project end-date remained scheduled to finish on 31 MAR 2025 . This is primarily due to the following factors: The schedule of the programme positions the Nature for Climate Fund programme well for delivery against its ambitious targets. The NCF Tree Programme is now well into delivery phase, with?a range of initiatives delivering tree planting but there has also been significant work to establish programme structures that will support successful delivery in years 3-5.","fyBaseline":108.65,"fyForecast":108.65,"fyVariance":0.0,"varianceNarrative":"The budget variance is inferior or equal to 5%.","wholeLifeCost":763.0,"costNarrative":"Compared to2021-Q4, the projects Baseline Whole Life Cost increased from 756.36 (£m) to 762.62 (£m). This is primarily due to the following factors: The slight increase in Whole Life Costs is due to the need for additional RDEL in some projects. This has been baselined in our most recent Business Case.","benefits":null,"benefitsNarrative":"","themes":["Delivery & schedule","Cost & funding","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 decreased from Amber/red to Amber Significant progress has been made to establish the programme and to begin delivery against the programme's ambitious objectives. The programme has accepted all recommendations that were made by the…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to 2021-Q4, your project end-date remained scheduled to finish on 31 MAR 2025 . This is primarily due to the following factors: The schedule of the programme positions the Nature for Climate Fund programme well for delivery against its ambitious targets. The NCF Tree Programme is now well into delivery phase, with?a range of initiatives delivering tree planting but there has also been significant work to establish programme structures that will support successful delivery in years 3-5.","narrativeClaimKind":null},{"id":"DEFRA_0013_2021-Q4","year":2023,"name":"Nature for Climate Fund","department":"DEFRA","category":"Infrastructure and Construction","description":"The Nature for Climate Fund Programme has been established to significantly increase tree planting, woodland creation and management, and peatland restoration in England to support the delivery of Net Zero and 25-Year Environment Plan commitments. The programme is also designed to deliver wider social, economic and environmental benefits.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 decreased from Amber to Red. This is primarily due to the following factors. We have implemented many of the recommendations made by the IPA in 2022, and continue to welcome their support and assurance to improve delivery confidence. We have continued programme activity at pace, having sought greater clarity over the future of woodland creation and recalibrated planned activity through the programme's annual review process.","startDate":"2020-04-01","endDate":"2025-03-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2025-03-31. This is primarily due to the following factors. The NCF Programme is now well into its delivery phase, witha range of initiatives scheduled to deliver tree planting and peatland restoration. The programme's trajectories are showing an upward trend through the remaining years of the programme, but there are several key enablers required to match the planned delivery trajectory, which steepens over that period, and these are not certain. These key enablers include landowner demand for the schemes put forward through the NCF and the ability of the wider sector to respond to that demand. There has been a significant effort to implement these enablers and improve delivery confidence for years 4-5, and for woodland creation and peatland restoration beyond NCF.","fyBaseline":219.26,"fyForecast":219.26,"fyVariance":0.0,"varianceNarrative":"The budget variance is inferior or equal to 5%.","wholeLifeCost":928.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 increased from 763m. to 928m. This is primarily due to the following factors. The increase in Whole Life Cost is due to an increase in the overall Programme budget and scope which was approved through an updated business case in 2022.","benefits":54302.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 54302m. The project's departmental-agree monetised benefits at 22/23-Q4 is 54302m.The project's departmental-agree monetised benefits at 22/23-Q4 is 54302m.The project's departmental-agree monetised benefits at 22/23-Q4 is 54302m. The total monetized benefits figure is based on the cumulative benefits arising from tree planting and peatland restoration over the course of the NCF programme. Measured over a 50-year appraisal period, these benefits include: carbon sequestration, biodiversity, recreation, flood regulation, air quality and landscape.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 decreased from Amber to Red. This is primarily due to the following factors. We have implemented many of the recommendations made by the IPA in 2022, and continue to welcome their support and assurance to improve delivery confidence.…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2025-03-31. This is primarily due to the following factors. The NCF Programme is now well into its delivery phase, witha range of initiatives scheduled to deliver tree planting and peatland restoration. The programme's trajectories are showing an upward trend through the remaining years of the programme, but there are several key enablers required to match the planned delivery trajectory, which steepens over that period, and these are not certain. These key enablers include landowner demand for the schemes put forward through the NCF and the ability of the wider sector to respond to that demand. There has been a significant effort to implement these enablers and improve delivery confidence for years 4-5, and for woodland creation and peatland restoration beyond NCF.","narrativeClaimKind":null},{"id":"DEFRA_0013_2021-Q4","year":2024,"name":"Nature for Climate Fund","department":"DEFRA","category":"Infrastructure and Construction","description":"The Nature for Climate Fund Programme has been established to significantly increase tree planting, woodland creation and management, and peatland restoration in England to support the delivery of Net Zero and 25-Year Environment Plan commitments. The programme is also designed to deliver wider social, economic and environmental benefits.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Red. This is primarily due to the following factors. The Nature for Climate Fund is increasing tree planting rates year on year, with 22/23 planting rates the highest in nearly a decade. Our work to transform the forestry sector is also starting to take effect. The Nature for Climate Peatland Grant is delivering increasing hectares of peatland restoration in England each year. Successive IPA reviews confirm that the Programme structure is broadly fit-for-purpose, with several notable strengths. However, whilst technically possible, reaching our tree planting and peatland restoration targets remains extremely challenging. Several external factors are delaying the progress of projects, including weather, sector capacity constraints, future funding uncertainty and the availability of private finance. Given this challenge, the delivery confidence for the Nature for Climate Fund is currently Red. Plans are in place to maximise delivery in Year 5 of the programme and prepare for the next phase of work. We continue to welcome support from the IPA.","startDate":"2020-04-01","endDate":"2025-03-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2025-03-31. This is primarily due to the following factors. The NCF Programme is now well into its delivery phase, with a range of initiatives scheduled to deliver tree planting and peatland restoration. The programme's trajectories are showing an upward trend through the remaining years of the programme, but there are several key enablers required to match the planned delivery trajectory, which steepens over that period, and these are not certain. These key enablers include landowner demand for the schemes put forward through the NCF and the ability of the wider sector to respond to that demand. There has been a significant effort to implement these enablers and improve delivery confidence for years 4-5, and for woodland creation and peatland restoration beyond NCF.","fyBaseline":265.11,"fyForecast":265.11,"fyVariance":0.0,"varianceNarrative":"The budget variance is inferior or equal to 5%.","wholeLifeCost":928.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 remained at 928m. This is primarily due to the following factors. The overall Programme budget and scope was approved through an updated business case in 2022.","benefits":48468.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 2324-Q4 decreased from 54302m. to 48468m. The total monetized benefits figure is based on the cumulative benefits arising from tree planting and peatland restoration over the course of the NCF programme. Measured over a 50-year appraisal period, these benefits include: carbon sequestration, biodiversity, recreation, flood regulation, air quality and landscape.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Red. This is primarily due to the following factors. The Nature for Climate Fund is increasing tree planting rates year on year, with 22/23 planting rates the highest in nearly a decade. Our work to transform the forestry…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2025-03-31. This is primarily due to the following factors. The NCF Programme is now well into its delivery phase, with a range of initiatives scheduled to deliver tree planting and peatland restoration. The programme's trajectories are showing an upward trend through the remaining years of the programme, but there are several key enablers required to match the planned delivery trajectory, which steepens over that period, and these are not certain. These key enablers include landowner demand for the schemes put forward through the NCF and the ability of the wider sector to respond to that demand. There has been a significant effort to implement these enablers and improve delivery confidence for years 4-5, and for woodland creation and peatland restoration beyond NCF.","narrativeClaimKind":null},{"id":"DEFRA_0013_2021-Q4","year":2025,"name":"NATURE FOR CLIMATE FUND","department":"DEFRA","category":"Infrastructure and Construction","description":"The Nature for Climate Fund Programme has been established to significantly increase tree planting, woodland creation and management, and peatland restoration in England to support the delivery of Net Zero and 25-Year Environment Plan commitments. The programme is also designed to deliver wider social, economic and environmental benefits.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remains Red. This is primarily due to the following factors‚ The data for the programme is taken up to the 31st of March 2025, and therefore is reflective of the financial uncertainty experienced by the programme in Q4, and difficult weather conditions during planting season. This prevented some planting occurring within the 24/25 financial year, so the programme was unable to deliver the full level of planting or peat restoration needed to meet the required trajectory towards the 2050 statutory target. However, as the programme receives data retrospectively after the end of the financial year, there is now more confidence in 24/25 delivery. The programme is predicted to deliver the highest year of annual planting since the inception of the Nature for Climate Fund, and the last 20 years. Furthermore, the programme's enabling projects have also significantly contributed to the transformation of the forestry sector for example by increasing sector capacity through grants and apprenticeships. The SRO assessment is Amber based on the data that became available in April 2025, and we anticipate subsequent ratings will be Amber when the data is available to all parties.","startDate":"2020-04-01","endDate":null,"scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2025 to 27/06/2025. This is primarily due to the following factors‚ The Nature for Climate Fund programme end date has been provisionally extended to the 31st of March 2026, subject to a review in June 2025, through an extension of the existing programme business case. This allowed the programme to maintain momentum using mature delivery mechanisms for the duration of the 2025/26 financial year whilst further work is carried out to design future tree planting activities.","fyBaseline":287.36,"fyForecast":287.36,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%. The budget variance is less than or equal to 5%.","wholeLifeCost":928.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 928. This is primarily due to the following factors‚ The overall Programme budget and scope was approved through an updated business case in 2022.","benefits":48468.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 48468. This is primarily due to the following factors‚ The total monetised benefits figure is based on the cumulative benefits arising from tree planting and peatland restoration over the course of the NCF programme. Measured over a 50-year appraisal period, these benefits include: carbon sequestration, biodiversity, recreation, flood regulation, air quality and landscape.","themes":["Cost & funding","Technical & integration","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remains Red. This is primarily due to the following factors‚ The data for the programme is taken up to the 31st of March 2025, and therefore is reflective of the financial uncertainty experienced by the programme in Q4, and difficult…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2025 to 27/06/2025. This is primarily due to the following factors‚ The Nature for Climate Fund programme end date has been provisionally extended to the 31st of March 2026, subject to a review in June 2025, through an extension of the existing programme business case. This allowed the programme to maintain momentum using mature delivery mechanisms for the duration of the 2025/26 financial year whilst further work is carried out to design future tree planting activities.","narrativeClaimKind":null},{"id":"DEFRA_0013_2021-Q4","year":2026,"name":"NATURE FOR CLIMATE FUND","department":"DEFRA","category":"Infrastructure and Construction","description":"To support the government’s ambitions for net zero and environmental improvement, Defra established the five-year Nature for Climate Fund Programme to increase tree planting and restore peatland in England. Between 2024‑25, the Programme directly planted 7,162 hectares of tree planting (95% of the annual target). Up to 2024-25 the programme directly funded 23,526 hectares of peatland restoration (67% of the annual target), contributing to total national delivery of 21,186 hectares of tree planting and 26,426 hectares of peatland restoration over the period. The Programme was extended into 2025‑26, with peatland grants extended to 2026‑27, while Defra considers future delivery and funding arrangements. The new Trees Programme (non GMPP) is expected to reach completion in 2030.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 2024‑25 Q4, the SRO Delivery Confidence Assessment (DCA) rating at 2025‑26 Q4 decreased to Amber. This reflects a combination of near‑term delivery pressures and pipeline risks, despite strong historical performance and a positive long‑term outlook. Official statistics for 2024‑25 showed a significant year‑on‑year increase in tree planting, with 7,164 hectares delivered in England, the highest annual rate in over 20 years, demonstrating the Programme’s ability to scale delivery. Delivery confidence for 2025‑26 has reduced due to a contraction in the tree planting pipeline since Q3, driven by lower expected output from England Woodland Creation Offer and the Community Forests and weather‑related impacts earlier in the season. Uncertainty over funding going into the final year of delivery will also have impacted the tree planting pipeline This has resulted in forecast delivery of around ~6000ha for the year. Mitigations are in place, including strengthened resourcing, organisational restructuring and the transition to the successor Trees Programme, supported by an approved business case. The rating reflects short‑term uncertainty while longer‑term delivery confidence remains strong, underpinned by improved capability, new funding mechanisms and a clear delivery pathway.","startDate":"2020-04-01","endDate":null,"scheduleNarrative":"Compared to financial year 2024‑25 Q4, the project’s end‑date at 2025‑26 Q4 remained the same, following a one‑year extension that was agreed to enable the design and mobilisation of the successor Trees Programme. The extension provided additional time to put in place future delivery arrangements and secure the necessary approvals, while maintaining continuity of activity. The programme closed at the end of March 2026, with key transition milestones on track and no further changes to the end‑date anticipated.","fyBaseline":255.2,"fyForecast":255.2,"fyVariance":0.0,"varianceNarrative":"The budget variance exceeds 5% by a small margin. This is primarily due to the following factors. The overall NCF Programme for 2025/26 is currently forecasting an underspend of £11.45m, representing a 5.55% variance against the agreed Financial Year baseline (inclusive of a £5.9m Defra underspend). This position remains indicative and subject to minor change as final outturn information is confirmed with ALB delivery partners and wider Defra teams. The majority of the variance relates to CDEL, which is forecast to underspend by £11.23m (6.36% under budget). This reflects slower-than-anticipated delivery across parts of the capital Programme during the year. RDEL performance remained broadly on track. Administration expenditure is forecast to be 0.89% under budget, while Programme expenditure is forecast to underspend by £0.22m (0.74%).","wholeLifeCost":1272.06,"costNarrative":"Compared to financial year 24/25‑Q4, the project’s departmentally agreed Whole Life Cost at 25/26‑Q4 increased to £176.52m CDEL and £29.88m RDEL. This increase is due to an agreed extension to the Programme to allow for the development and transition to a successor Programme. The increase in Whole Life Costs reflects the extended duration of the Programme rather than any change in scope or increase in cost per unit, with underlying delivery costs and assumptions remaining unchanged.","benefits":30171.62,"benefitsNarrative":"Compared to financial year 24/25‑Q4, the project’s departmentally agreed Benefits at 25/26‑Q4 remained unchanged. This is because the agreed outcomes, scope, and benefits methodology have not changed following the Programme extension, which was agreed to allow for the development of a successor Programme. The extension impacts the duration of delivery rather than the nature or scale of benefits, and no new evidence or methodological changes have been introduced that would materially affect the benefits valuation.","themes":["Cost & funding","Delivery & schedule","Scope & requirements","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 2024‑25 Q4, the SRO Delivery Confidence Assessment (DCA) rating at 2025‑26 Q4 decreased to Amber. This reflects a combination of near‑term delivery pressures and pipeline risks, despite strong historical performance and a positive long‑term outlook. Official statistics for 2024‑25 showed a significant year‑on‑year increase in tree…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 2024‑25 Q4, the project’s end‑date at 2025‑26 Q4 remained the same, following a one‑year extension that was agreed to enable the design and mobilisation of the successor Trees Programme. The extension provided additional time to put in place future delivery arrangements and secure the necessary approvals, while maintaining continuity of activity. The programme closed at the end of March 2026, with key transition milestones on track and no further changes to the end‑date anticipated.","narrativeClaimKind":null}],"previous":{"id":"DEFRA_0013_2021-Q4","year":2025,"name":"NATURE FOR CLIMATE FUND","department":"DEFRA","category":"Infrastructure and Construction","description":"The Nature for Climate Fund Programme has been established to significantly increase tree planting, woodland creation and management, and peatland restoration in England to support the delivery of Net Zero and 25-Year Environment Plan commitments. The programme is also designed to deliver wider social, economic and environmental benefits.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remains Red. This is primarily due to the following factors‚ The data for the programme is taken up to the 31st of March 2025, and therefore is reflective of the financial uncertainty experienced by the programme in Q4, and difficult weather conditions during planting season. This prevented some planting occurring within the 24/25 financial year, so the programme was unable to deliver the full level of planting or peat restoration needed to meet the required trajectory towards the 2050 statutory target. However, as the programme receives data retrospectively after the end of the financial year, there is now more confidence in 24/25 delivery. The programme is predicted to deliver the highest year of annual planting since the inception of the Nature for Climate Fund, and the last 20 years. Furthermore, the programme's enabling projects have also significantly contributed to the transformation of the forestry sector for example by increasing sector capacity through grants and apprenticeships. The SRO assessment is Amber based on the data that became available in April 2025, and we anticipate subsequent ratings will be Amber when the data is available to all parties.","startDate":"2020-04-01","endDate":null,"scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2025 to 27/06/2025. This is primarily due to the following factors‚ The Nature for Climate Fund programme end date has been provisionally extended to the 31st of March 2026, subject to a review in June 2025, through an extension of the existing programme business case. This allowed the programme to maintain momentum using mature delivery mechanisms for the duration of the 2025/26 financial year whilst further work is carried out to design future tree planting activities.","fyBaseline":287.36,"fyForecast":287.36,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%. The budget variance is less than or equal to 5%.","wholeLifeCost":928.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 928. This is primarily due to the following factors‚ The overall Programme budget and scope was approved through an updated business case in 2022.","benefits":48468.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 48468. This is primarily due to the following factors‚ The total monetised benefits figure is based on the cumulative benefits arising from tree planting and peatland restoration over the course of the NCF programme. Measured over a 50-year appraisal period, these benefits include: carbon sequestration, biodiversity, recreation, flood regulation, air quality and landscape.","themes":["Cost & funding","Technical & integration","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remains Red. This is primarily due to the following factors‚ The data for the programme is taken up to the 31st of March 2025, and therefore is reflective of the financial uncertainty experienced by the programme in Q4, and difficult…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2025 to 27/06/2025. This is primarily due to the following factors‚ The Nature for Climate Fund programme end date has been provisionally extended to the 31st of March 2026, subject to a review in June 2025, through an extension of the existing programme business case. This allowed the programme to maintain momentum using mature delivery mechanisms for the duration of the 2025/26 financial year whilst further work is carried out to design future tree planting activities.","narrativeClaimKind":null},"ratingDelta":-1,"transition":"Improved","endDateDeltaDays":null,"attentionScore":18,"attentionReasons":["Current published delivery confidence is Amber"]},{"id":"DCMS_0018_2021-Q3","year":2026,"name":"Natural History Museum Unlocked","department":"DCMS","category":"Infrastructure and Construction","description":"NHM Unlocked is an ambitious programme to secure the future of our irreplaceable collection, accelerate scientific research and innovation, and enhance our public offer. Underpinned by a £201 million government investment, we are looking to: build a sustainable new centre at Thames Valley Science Park, equipped with purpose-built collections storage, laboratories and 160 Museum scientists; relocate millions of natural history specimens, many of which will be housed in the new centre; and capture digital specimen data for use by partners around the world. The programme will not only enhance the UK’s leading role in tackling urgent global challenges, but also unlock the redevelopment of our historic South Kensington site – transforming our public offer and mission to create advocates for the planet.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Delivery Confidence Assessment (DCA) at 2025/26 Q4 is Amber, the same rating as provided at 2024/25 Q4. The contract for construction at Thames Valley Science Park was awarded at the start of the 2025/26 Financial Year and full contract works commenced on site shortly after. Construction has since progressed well, though it is felt that an Amber rating is appropriate for the programme due to the following factors: (i) A significant amount of procurement remains to be completed (ii) There are a number of complex dependencies which have the potential to impact programme delivery (iii) Even a small change to the construction schedule can have a significant impact on the phasing of programme spend","startDate":"2019-05-15","endDate":null,"scheduleNarrative":"The programme's end date remains September 2031, which is the same date reported at 2024/25 Q4. Construction has progressed slightly ahead of schedule during 2025/26 and is expected to conclude in Summer 2027. Plans for the storage fit out and handover of the building are being finalised, alongside the schedule for moving collections to the new site.","fyBaseline":50.02,"fyForecast":49.95,"fyVariance":0.14,"varianceNarrative":"The budget variance is less than 5% for the 2025/26 Financial Year. The programme budget was recently reprofiled to ensure that phasing of spend is more closely aligned with the latest construction schedule.","wholeLifeCost":213.15,"costNarrative":"The programme's Whole Life Cost (WLC) remains £221m, the same figure reported at 2024/25 Q4. Please note figures referenced in the narratives were entered as nominal and the system automatically converts them to Real Terms.","benefits":2025.56,"benefitsNarrative":"There is no change to the benefits reported at 2024/25 Q4. These remain the same as the figures included in the programme's approved Full Business Case.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain"],"evidenceExcerpt":"The Delivery Confidence Assessment (DCA) at 2025/26 Q4 is Amber, the same rating as provided at 2024/25 Q4. The contract for construction at Thames Valley Science Park was awarded at the start of the 2025/26 Financial Year and full contract works commenced on site shortly after. Construction has since progressed well, though it is felt that an Amber rating…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The programme's end date remains September 2031, which is the same date reported at 2024/25 Q4. Construction has progressed slightly ahead of schedule during 2025/26 and is expected to conclude in Summer 2027. Plans for the storage fit out and handover of the building are being finalised, alongside the schedule for moving collections to the new site.","narrativeClaimKind":null,"history":[{"id":"DCMS_0018_2021-Q3","year":2021,"name":"Natural History Museum at Harwell","department":"DCMS","category":"Infrastructure and Construction","description":"The �182m DCMS-funded NHM@Harwell programme will create a Science and Digitisation centre to advance global scientific knowledge and the scientific, cultural and wider objectives of the UK Government by transforming the NHM collections' physical environment and improving physical and digital research access to the collections and their associated data. This will enable the Museum to secure and digitise its growing collections for increased research use throughout this century and into the next, providing a springboard for partnerships, and employing and developing new technologies.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber.This is primarily due to the following factors: Our Amber Infrastructure Project Authority's Delivery Confidence Assessment rating is primarily due to the programme being under IPA monitoring. As recommended by the IPA we are making programme budgeting a key focus of our first formal review and have scheduled it in early summer to enable recommendations to be acted on ahead of the outline business case submission. The NHM@Harwell Programme team are also drawing up a shortlist of projects and programmes we would like to benchmark against to improve cost certainty as recommended by IPA. Further to this we have explored our key programme risks, including some related to budget, with DCMS experts and the Natural History Museum's Infrastructure Committee and are planning a formal 'deep dive' review of programme risks with IPA and DCMS. NHM@Harwell are also in ongoing discussions with the DCMS to develop a Memorandum of Understanding with HM Treasury on end year flexibility to ensure effective joint work to manage the programme budget.","startDate":"2019-05-15","endDate":"2026-12-30","scheduleNarrative":"The project end-date is 30 December 2026. This is primarily due to the following factors: The programme is still working to the schedule agreed in the Strategic Outline Case+, with the decision on what collections move to Harwell expected this summer, Royal Institute of British Architects stage 3 of the build programme planned to begin in autumn, and construction commencing in 2023. The scope to bring forward the start date of construction has recently been explored and, following modelling of the knock on consequences for budget and timeline, a decision to retain the current timeline has been taken. This will be kept under review as the Natural History Museum are keen to maximise opportunities to accelerate the build programme where feasible.","fyBaseline":1.54,"fyForecast":1.42,"fyVariance":-8.0,"varianceNarrative":"The budget variance exceeds 5%. Reduction in spend due to underspend in the capital expenditure, slightly offset by an increase in revenue expenditure. Primarily this is driven by delays in the build profile expenditure. This does not reflect a change in the overall programme spend. The memorandum of understanding relating to end year flexibility that the programme are seeking from HM Treasury would would assist in managing future variance.","wholeLifeCost":181.76,"costNarrative":"The projects Baseline Whole Life Cost is �181.76m. This is primarily due to the following factors: Full Budgeted Costs unchanged since previous iteration. Fully funded by DCMS.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber.This is primarily due to the following factors: Our Amber Infrastructure Project Authority's Delivery Confidence Assessment rating is primarily due to the programme being under IPA monitoring. As recommended by the IPA we are making programme budgeting a key focus of our…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project end-date is 30 December 2026. This is primarily due to the following factors: The programme is still working to the schedule agreed in the Strategic Outline Case+, with the decision on what collections move to Harwell expected this summer, Royal Institute of British Architects stage 3 of the build programme planned to begin in autumn, and construction commencing in 2023. The scope to bring forward the start date of construction has recently been explored and, following modelling of the knock on consequences for budget and timeline, a decision to retain the current timeline has been taken. This will be kept under review as the Natural History Museum are keen to maximise opportunities to accelerate the build programme where feasible.","narrativeClaimKind":null},{"id":"DCMS_0018_2021-Q3","year":2022,"name":"Natural History Museum at Harwell","department":"DCMS","category":"Infrastructure and Construction","description":"The £182m DCMS-funded NHM@Harwell programme will create a Science and Digitisation centre to advance global scientific knowledge and the scientific, cultural and wider objectives of the UK Government by transforming the NHM collections' physical environment and improving physical and digital research access to the collections and their associated data. This will enable the Museum to secure and digitise its growing collections for increased research use throughout this century and into the next, providing a springboard for partnerships, and employing and developing new technologies.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","startDate":"2019-05-15","endDate":"2026-12-30","scheduleNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","fyBaseline":6.55,"fyForecast":2.92,"fyVariance":-55.0,"varianceNarrative":"The budget variance exceeds 5%. Reduction of capital spend in the year due to delays to RIBA (Royal Institute of British Architects) stages 2 and consequent deferral of RIBA 3. This has led to capital expenditure being pushed later into the project life, and this variance in expenditure being pure phasing of costs and not project underspend. Awaiting guidance on spending review submission points from HM Treasury, which will come at OBC gateway stage.","wholeLifeCost":182.0,"costNarrative":"Compared to 2021-Q4,the projects Baseline Whole Life Cost remained at 181.76 (£m). This is primarily due to the following factors: Full Budgeted Costs unchanged since previous iteration. Fully funded by DCMS.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Commercial & supply chain","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests. Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","narrativeClaimKind":null},{"id":"DCMS_0018_2021-Q3","year":2023,"name":"Natural History Museum Unlocked","department":"DCMS","category":"Infrastructure and Construction","description":"NHM Unlocked is an ambitious programme to secure the future of our irreplaceable collection, accelerate scientific research and innovation, and enhance our public offer. Underpinned by a 201 million government investment, we are looking to: build a sustainable new centre at Thames Valley Science Park, equipped with purpose-built collections storage, laboratories and 160 Museum scientists; relocate 38 million natural history specimens, of which 28 million will be housed in the new centre; and capture digital specimen data for use by partners around the world. The programme will not only enhance the UKs leading role in tackling urgent global challenges, but also unlock the redevelopment of our historic South Kensington site transforming our public offer and mission to create advocates for the planet.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 is Amber. This is primarily due to the following factors. Rating decreased to red during this year due to delay in agreeing the site lease and having to swiftly enact a mitigation plan which led to deviation from the schedule previously presented in the Strategic Outline Case. Subsequent further changes to the timeline were as a result of a need for an additional assurance review to follow completion of Royal Institute of British Architects stage 2 and precede Outline Business Case resubmission, plus need to revisit RIBA 2 post OBC approval to incorporate area savings on labs and collections areas to meet revised budget and avoid delaying TAP further. Following successful approval of our preferred OBC option the programme considers that there are no major outstanding issues currently threatening successful delivery.","startDate":"2019-05-15","endDate":"2031-09-30","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 increased from 2026-12-30 to 2031-09-30. This is primarily due to the following factors. Delay in agreeing the site lease and having to swiftly enact a mitigation plan led to deviation from the schedule previously presented in the SOC+. Subsequent further changes to the timeline were as a result of a need for an additional assurance review to follow completion of RIBA 2 and precede OBC resubmission, plus need to revisit RIBA 2 post TAP to incorporate area savings on labs and collections areas to meet revised budget and avoid delaying TAP further. The programme also now includes a longer time period for the physical move of collections to the new site as more detailed planning than had taken place at SOC stage identified that additional time would be required to complete one of the largest ever moves of natural history collections.","fyBaseline":6.35,"fyForecast":6.38,"fyVariance":0.0,"varianceNarrative":"The GMPP project did not provide data","wholeLifeCost":229.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 increased from 182m. to 229m. This is primarily due to the following factors. Forecast/actual costs have been rephased to reflect more realistic timelines matching the approved Outline Business Case timeline. Figures reflect recent approved budget allocation following OBC. Actuals and Forecast have all been reclassified as Capital as per ESA 10 directive for R&D. Previously they were split between Resource and Capital, also they now reflect the approved option 4 HMT allocation.","benefits":1985.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 1985m. The project's departmental-agree monetised benefits at 22/23-Q4 is 1985m.The project's departmental-agree monetised benefits at 22/23-Q4 is 1985m.The project's departmental-agree monetised benefits at 22/23-Q4 is 1985m. Monetised benefits presented are from the SOC, updated annualised figures will be presented in the next return. The bulk of the benefits associated with creating a new NHM centre will be felt by UK society, rather than the NHM. Not all the potential benefits are quantifiable. Where benefits have been quantified, the approach to quantification has been deliberately conservative. Benefits primarily arise from improvements to growth potential from creating new scientific infrastructure through an enhanced innovation ecosystem and undertaking scientific research and development. The benefit to cost ratio of the approved delivery option is over 7:1.","themes":["Delivery & schedule","Cost & funding","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 is Amber. This is primarily due to the following factors. Rating decreased to red during this year due to delay in agreeing the site lease and having to swiftly enact a mitigation plan which led to deviation from the schedule previously presented in the Strategic…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 increased from 2026-12-30 to 2031-09-30. This is primarily due to the following factors. Delay in agreeing the site lease and having to swiftly enact a mitigation plan led to deviation from the schedule previously presented in the SOC+. Subsequent further changes to the timeline were as a result of a need for an additional assurance review to follow completion of RIBA 2 and precede OBC resubmission, plus need to revisit RIBA 2 post TAP to incorporate area savings on labs and collections areas to meet revised budget and avoid delaying TAP further. The programme also now includes a longer time period for the physical move of collections to the new site as more detailed planning than had taken place at SOC stage identified that additional time would be required to complete one of the largest ever moves of natural history collections.","narrativeClaimKind":null},{"id":"DCMS_0018_2021-Q3","year":2024,"name":"Natural History Museum Unlocked","department":"DCMS","category":"Infrastructure and Construction","description":"NHM Unlocked is an ambitious programme to secure the future of our irreplaceable collection, accelerate scientific research and innovation, and enhance our public offer. Underpinned by a 201 million government investment, we are looking to: build a sustainable new centre at Thames Valley Science Park, equipped with purpose-built collections storage, laboratories and 160 Museum scientists; relocate 38 million natural history specimens, of which 28 million will be housed in the new centre; and capture digital specimen data for use by partners around the world. The programme will not only enhance the UK's leading role in tackling urgent global challenges, but also unlock the redevelopment of our historic South Kensington site - transforming our public offer and mission to create advocates for the planet.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. Rating remains at amber. This follows an IPA Gate 0 review in February 2024 which saw the programme given a delivery confidence assessment of amber, noting that work was continuing at pace across the various projects and that there has been significant positive progress since the approval of the Outline Business Case. Following the review, three actions are being implemented ahead of Full Business Case submission over the summer: 1. Modelling the direct and indirect costs of delay in FBC approval and determining optimum timing for FBC submission. 2. Providing a greater emphasis on the more immediate benefits of the programme in the FBC. 3. Developing a critical path and dependencies map for the collections move project, given its complexity and length.","startDate":"2019-05-15","endDate":"2031-09-30","scheduleNarrative":"The project's end-date at 23/24-Q4 is 2031-09-30. This is primarily due to the following factors. Currently, there is no deviation from the planned schedule.","fyBaseline":5.71,"fyForecast":6.75,"fyVariance":18.0,"varianceNarrative":"For 23/24, the forecast is 6.75m against a baseline of 5.71m, amounting to a variance of 18%. This change is as a result of reprofiling of professional fees for the construction of the new centre (which are to be accrued earlier than previously expected). The overspend is partly offset by 300k underspend from previous years. Predicted and known costs between reporting quarters have been updated in line with forecasted/estimated fees to the end of the project. Work is ongoing regarding tenders for non-professional fee elements of the programme, and this information will be updated as tenders are awarded. It was originally believed this would impact mostly future years' predicted costs. However, it has also now impacted the last quarter of 23/24, with the hope this will have cost benefits later on within the project.","wholeLifeCost":228.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 decreased from 229m. to 228m. This is primarily due to the following factors: As of 23/24 Q4, the total project forecast is 230.12m, amounting to a variance of 0.7%. Forecasts for FY 23/24 have been reviewed in detail for known and probable variances, with subsequent financial years being updated to reflect predicted costs and possible inflation at that time. We are currently forecasting an overspend for 2023/24. This is lower than our agreed 20% flexibility and predominantly due to reprofiling of professional fees related to the construction of the new centre from 24/25.","benefits":1698.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 2324-Q4 decreased from 1985m. to 1698m. This change is due to the benefits being updated after OBC approval to reflect the latest economic analysis conducted for the OBC. The previous £1985m estimate was from the SOC stage in March 2020.","themes":["Delivery & schedule","Cost & funding","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. Rating remains at amber. This follows an IPA Gate 0 review in February 2024 which saw the programme given a delivery confidence assessment of amber, noting that work was continuing at pace across the various…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 23/24-Q4 is 2031-09-30. This is primarily due to the following factors. Currently, there is no deviation from the planned schedule.","narrativeClaimKind":null},{"id":"DCMS_0018_2021-Q3","year":2025,"name":"Natural History Museum Unlocked","department":"DCMS","category":"Infrastructure and Construction","description":"NHM Unlocked is an ambitious programme to secure the future of the Natural History Museum's irreplaceable collections, accelerate scientific research and innovation, and enhance our public offer. Underpinned by a £201 million government investment, we are looking to: (i) build a sustainable new centre at Thames Valley Science Park, equipped with purpose-built collections storage and laboratories; (ii) relocate 38 million natural history specimens, 28 million of which will be housed in the new centre; and (iii) enable the capture of digital specimen data for use by partners around the world. The programme will also ensure that gallery space can be freed up at our historic South Kensington site, enabling its redevelopment to transform our public offer and mission to create advocates for the planet.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors: At the end of the 24/25 Financial Year, the construction contract for the new building at TVSP was still being negotiated. Although funding for Unlocked was confirmed through the approval of the Final Business Case in January 2025, the agreement of the contract was key to enabling budget certainty and no delays to the construction timeline. It was therefore felt that an Amber DCA was more appropriate whilst contract negotiations were ongoing, though it should be noted that the construction contract has subsequently been awarded.","startDate":"2019-05-15","endDate":"2031-09-30","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 30/09/2031. This is primarily due to the following factors: Critical programme activity in 2024/25, including approval of the programme's Final Business Case and negotiation of the construction contract, continued on track or with small delays which were within tolerance levels. This means that the programme's projected end date remained the same as it was at the end of 2023/24.","fyBaseline":23.76,"fyForecast":23.32,"fyVariance":1.85,"varianceNarrative":"The budget variance is less than or equal to 5%. The 2024/25 actual spend for the programme of £23.32m represents a small underspend against the £23.76m baseline. This underspend is well within the 10% Departmental tolerance and will be rolled forward to FY 25/26. The underspend is partly due to an ongoing review of resource requirements across some areas of the programme, which has resulted in fewer posts being recruited than originally anticipated, in turn reducing staff costs.","wholeLifeCost":221.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 228 to 221. This is primarily due to the following factors: The financial figures reported at the end of the 24/25 Financial Year are from the Final Business Case (FBC), approved by Treasury in January 2025. In 23/24, figures from the 2023 Outline Business Case (OBC) were being reported, which included some associated programme costs that are no longer in the core Unlocked budget.","benefits":1946.81,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 1698 to 1946. This is primarily due to the following factors: The benefits figures reported at the end of the 24/25 Financial Year are from the Final Business Case (FBC), approved by Treasury in January 2025. Previously, figures from the 2023 Outline Business Case (OBC) were being reported. As part of the process of putting together the FBC, the benefits figures were updated to reflect the latest economic analysis.","themes":["Cost & funding","Approvals & decisions","Commercial & supply chain","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors: At the end of the 24/25 Financial Year, the construction contract for the new building at TVSP was still being negotiated. Although funding for Unlocked was confirmed…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 30/09/2031. This is primarily due to the following factors: Critical programme activity in 2024/25, including approval of the programme's Final Business Case and negotiation of the construction contract, continued on track or with small delays which were within tolerance levels. This means that the programme's projected end date remained the same as it was at the end of 2023/24.","narrativeClaimKind":null},{"id":"DCMS_0018_2021-Q3","year":2026,"name":"Natural History Museum Unlocked","department":"DCMS","category":"Infrastructure and Construction","description":"NHM Unlocked is an ambitious programme to secure the future of our irreplaceable collection, accelerate scientific research and innovation, and enhance our public offer. Underpinned by a £201 million government investment, we are looking to: build a sustainable new centre at Thames Valley Science Park, equipped with purpose-built collections storage, laboratories and 160 Museum scientists; relocate millions of natural history specimens, many of which will be housed in the new centre; and capture digital specimen data for use by partners around the world. The programme will not only enhance the UK’s leading role in tackling urgent global challenges, but also unlock the redevelopment of our historic South Kensington site – transforming our public offer and mission to create advocates for the planet.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Delivery Confidence Assessment (DCA) at 2025/26 Q4 is Amber, the same rating as provided at 2024/25 Q4. The contract for construction at Thames Valley Science Park was awarded at the start of the 2025/26 Financial Year and full contract works commenced on site shortly after. Construction has since progressed well, though it is felt that an Amber rating is appropriate for the programme due to the following factors: (i) A significant amount of procurement remains to be completed (ii) There are a number of complex dependencies which have the potential to impact programme delivery (iii) Even a small change to the construction schedule can have a significant impact on the phasing of programme spend","startDate":"2019-05-15","endDate":null,"scheduleNarrative":"The programme's end date remains September 2031, which is the same date reported at 2024/25 Q4. Construction has progressed slightly ahead of schedule during 2025/26 and is expected to conclude in Summer 2027. Plans for the storage fit out and handover of the building are being finalised, alongside the schedule for moving collections to the new site.","fyBaseline":50.02,"fyForecast":49.95,"fyVariance":0.14,"varianceNarrative":"The budget variance is less than 5% for the 2025/26 Financial Year. The programme budget was recently reprofiled to ensure that phasing of spend is more closely aligned with the latest construction schedule.","wholeLifeCost":213.15,"costNarrative":"The programme's Whole Life Cost (WLC) remains £221m, the same figure reported at 2024/25 Q4. Please note figures referenced in the narratives were entered as nominal and the system automatically converts them to Real Terms.","benefits":2025.56,"benefitsNarrative":"There is no change to the benefits reported at 2024/25 Q4. These remain the same as the figures included in the programme's approved Full Business Case.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain"],"evidenceExcerpt":"The Delivery Confidence Assessment (DCA) at 2025/26 Q4 is Amber, the same rating as provided at 2024/25 Q4. The contract for construction at Thames Valley Science Park was awarded at the start of the 2025/26 Financial Year and full contract works commenced on site shortly after. Construction has since progressed well, though it is felt that an Amber rating…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The programme's end date remains September 2031, which is the same date reported at 2024/25 Q4. Construction has progressed slightly ahead of schedule during 2025/26 and is expected to conclude in Summer 2027. Plans for the storage fit out and handover of the building are being finalised, alongside the schedule for moving collections to the new site.","narrativeClaimKind":null}],"previous":{"id":"DCMS_0018_2021-Q3","year":2025,"name":"Natural History Museum Unlocked","department":"DCMS","category":"Infrastructure and Construction","description":"NHM Unlocked is an ambitious programme to secure the future of the Natural History Museum's irreplaceable collections, accelerate scientific research and innovation, and enhance our public offer. Underpinned by a £201 million government investment, we are looking to: (i) build a sustainable new centre at Thames Valley Science Park, equipped with purpose-built collections storage and laboratories; (ii) relocate 38 million natural history specimens, 28 million of which will be housed in the new centre; and (iii) enable the capture of digital specimen data for use by partners around the world. The programme will also ensure that gallery space can be freed up at our historic South Kensington site, enabling its redevelopment to transform our public offer and mission to create advocates for the planet.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors: At the end of the 24/25 Financial Year, the construction contract for the new building at TVSP was still being negotiated. Although funding for Unlocked was confirmed through the approval of the Final Business Case in January 2025, the agreement of the contract was key to enabling budget certainty and no delays to the construction timeline. It was therefore felt that an Amber DCA was more appropriate whilst contract negotiations were ongoing, though it should be noted that the construction contract has subsequently been awarded.","startDate":"2019-05-15","endDate":"2031-09-30","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 30/09/2031. This is primarily due to the following factors: Critical programme activity in 2024/25, including approval of the programme's Final Business Case and negotiation of the construction contract, continued on track or with small delays which were within tolerance levels. This means that the programme's projected end date remained the same as it was at the end of 2023/24.","fyBaseline":23.76,"fyForecast":23.32,"fyVariance":1.85,"varianceNarrative":"The budget variance is less than or equal to 5%. The 2024/25 actual spend for the programme of £23.32m represents a small underspend against the £23.76m baseline. This underspend is well within the 10% Departmental tolerance and will be rolled forward to FY 25/26. The underspend is partly due to an ongoing review of resource requirements across some areas of the programme, which has resulted in fewer posts being recruited than originally anticipated, in turn reducing staff costs.","wholeLifeCost":221.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 228 to 221. This is primarily due to the following factors: The financial figures reported at the end of the 24/25 Financial Year are from the Final Business Case (FBC), approved by Treasury in January 2025. In 23/24, figures from the 2023 Outline Business Case (OBC) were being reported, which included some associated programme costs that are no longer in the core Unlocked budget.","benefits":1946.81,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 1698 to 1946. This is primarily due to the following factors: The benefits figures reported at the end of the 24/25 Financial Year are from the Final Business Case (FBC), approved by Treasury in January 2025. Previously, figures from the 2023 Outline Business Case (OBC) were being reported. As part of the process of putting together the FBC, the benefits figures were updated to reflect the latest economic analysis.","themes":["Cost & funding","Approvals & decisions","Commercial & supply chain","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors: At the end of the 24/25 Financial Year, the construction contract for the new building at TVSP was still being negotiated. Although funding for Unlocked was confirmed…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 30/09/2031. This is primarily due to the following factors: Critical programme activity in 2024/25, including approval of the programme's Final Business Case and negotiation of the construction contract, continued on track or with small delays which were within tolerance levels. This means that the programme's projected end date remained the same as it was at the end of 2023/24.","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":null,"attentionScore":18,"attentionReasons":["Current published delivery confidence is Amber"]},{"id":"DECC_0010_1112-Q1","year":2026,"name":"Smart Metering Implementation Programme","department":"DESNZ","category":"Infrastructure and Construction","description":"The Smart Metering Implementation Programme is replacing existing traditional gas and electricity meters across Great Britain with smart meters. Smart meters deliver near-real time information to consumers on their energy consumption, and helps them to control energy use, save energy and reduce bills. They also enable technologies such as electric vehicles, heat pumps, batteries and solar panels to be efficiently and cost-effectively integrated to a flexible energy system that supports the cost-effective delivery of government’s Clean Power 2030 and Net Zero commitments. The Government is committed to ensuring that all households and small businesses can benefit from smart meters as soon as possible. Regulatory drivers are in place to drive industry investment in the delivery and operation of smart metering at scale.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at AMBER. This is primarily due to the following factors: Smart metering continues to deliver benefits to consumers, such as engagement on energy consumption, accurate energy bills and improved customer service, and is key to the 2030 Clean Power Mission. There were 41 million smart and advanced meters operating across Great Britain at the end of 2025 and 71% of all meters are now smart or advanced. A new regulatory framework is now in place to drive industry to maintain high levels of operational performance whilst effectively completing the rollout by 2030. There is continued collaboration with stakeholders including energy suppliers and the Data Communications Company to drive further improvements in engagement, appointment fulfilment and operation of meters, and ensuring technology roadmaps for the next decade are suitably developed and addressed. Improvements to the network continue to be made including deployment of 4G Communications Hubs at scale and launch of the Virtual Wide Area Network solution that allows consumers to access smart metering services through their broadband (with consent).","startDate":"2009-12-02","endDate":"2030-12-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same as last year at 31/12/2030. This is primarily due to the following factors: SMIP continues to make good progress with the successful delivery of the smart meter rollout in delivering its strategic outcomes. Progress continues with circa.90k+ gross installs per week and a continued increasing proportion of meters installed (71% as of end 2025) and operating as they should (92.3%). The new regulatory framework to 2030 will continue to deliver industry investment at scale and drive high levels of operational performance and smart coverage, which are key to the 2030 Clean Power Mission.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":20176.55,"costNarrative":"The programme’s departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) is 20177. The total whole life cost figures are presented in undiscounted nominal terms. The figure differs from the total cost figure in the Smart Metering Implementation Programme’s 2019 CBA, which is expressed in 2011 prices discounted to 2019 in line with HM Treasury appraisal guidance. This reflects the latest economic appraisal of the costs of the programme, including (but not limited to) costs from new assets, installation visits and setting up and operating the new communications infrastructure.","benefits":34130.34,"benefitsNarrative":"Compared to financial year 24/25-Q4, the programme’s departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained the same as last year at 34130. This is primarily due to the following factors: The total whole life benefits figures are presented in undiscounted nominal terms, for comparability with other programmes. The figure differs from the total benefit figure in the Smart Metering Implementation Programme’s 2019 CBA, which is expressed in 2011 prices discounted to 2019 in line with HM Treasury appraisal guidance. This reflects the latest economic appraisal of the benefits of the programme, including (but not limited to) benefits from reduced energy consumption, reduced greenhouse gas emissions, reduced site visits by suppliers, improved network management, and improved customer switching.","themes":["Cost & funding","Delivery & schedule","Technical & integration","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at AMBER. This is primarily due to the following factors: Smart metering continues to deliver benefits to consumers, such as engagement on energy consumption, accurate energy bills and improved customer service, and is key to the 2030 Clean Power…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same as last year at 31/12/2030. This is primarily due to the following factors: SMIP continues to make good progress with the successful delivery of the smart meter rollout in delivering its strategic outcomes. Progress continues with circa.90k+ gross installs per week and a continued increasing proportion of meters installed (71% as of end 2025) and operating as they should (92.3%). The new regulatory framework to 2030 will continue to deliver industry investment at scale and drive high levels of operational performance and smart coverage, which are key to the 2030 Clean Power Mission.","narrativeClaimKind":null,"history":[{"id":"DECC_0010_1112-Q1","year":2020,"name":"Smart Metering Implementation Programme","department":"BEIS","category":"Infrastructure and Construction","description":"To offer every home and small business a Smart Meter by 2020.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber, which has improved since last year�s Q2 1819 Amber/Red, due primarily to the following factors; - There are now c.17 million smart and advanced meters operating across Great Britain. - The Programme has worked with industry delivery partners to successfully implement complex technical solutions that will transform the customer experience. - The Programme has updated its Cost-Benefit Analysis. Since the Q2 1920 (30th September 2019) Amber IPA DCA, the following primary project actions have impacted the original Q2 IPA DCA; - The Programme has consulted on a new regulatory framework for energy suppliers to drive market-wide completion of the smart meter rollout as soon as practicable. - The Programme continues to work with industry delivery partners to implement and drive market-wide completion, while also taking into account the impact of COVID-19.","startDate":"2009-12-02","endDate":"2024-12-31","scheduleNarrative":"The scheduled baseline project end date at Q2 1920 (30th September 2019) is 31/12/24, has lengthened by 1461 days since last year's Q2 1819 date of 31/12/20, due primarily to the following factors; - The Programme is on schedule to meet the commitment for every home and small business to be offered a Smart Meter by the end of 2020. - The updated 2019 Cost-Benefit Analysis includes an extended appraisal period so the Programme has consulted on the introduction of a new regulatory framework for energy suppliers that supports market-wide rollout of smart meters as soon as practicable. Since the Q2 1920 (30th September 2019) baseline project end date of 31/12/24, the following primary project actions have impacted the original Q2 baseline project end date; - A thorough evaluation of the new regulatory framework consultation responses has been conducted. - The impact of COVID-19 is being considered with key stakeholders and assessed by the Programme.","fyBaseline":1065.9,"fyForecast":1065.9,"fyVariance":0.0,"varianceNarrative":"Budget variance less than 5%","wholeLifeCost":20136.95,"costNarrative":"The baseline Whole Life Cost at Q2 1920 (30th September 2019) is �20,136.95 m, has increased by �2921.18 m since last year's Q2 1819 (�m) baseline Whole Life Cost of �17,215.78 m, due primarily to the following factors; - The updated 2019 Cost-Benefit Analysis includes an extended appraisal period. As a result, it captures both additional costs and additional benefits over the new appraisal period. - Overall, the benefits have increased by more than the costs resulting in an increase in the net benefits for the Programme. Since the Q2 1920 (30th September 2019) �20,136.95 m baseline Whole Life Cost, the following primary project actions have impacted the original Q2 baseline Whole Life Cost; - A lessons learned exercise around the new Cost-Benefit Analysis has been conducted. - Programme costs continue to be effectively managed, and addressed through appropriate governance groups.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Governance & assurance"],"evidenceExcerpt":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber, which has improved since last year�s Q2 1819 Amber/Red, due primarily to the following factors; - There are now c.17 million smart and advanced meters operating across Great Britain. - The Programme has worked with industry delivery partners to successfully…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2020","sourceLabel":"IPA Annual Report 2019-20","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The scheduled baseline project end date at Q2 1920 (30th September 2019) is 31/12/24, has lengthened by 1461 days since last year's Q2 1819 date of 31/12/20, due primarily to the following factors; - The Programme is on schedule to meet the commitment for every home and small business to be offered a Smart Meter by the end of 2020. - The updated 2019 Cost-Benefit Analysis includes an extended appraisal period so the Programme has consulted on the introduction of a new regulatory framework for energy suppliers that supports market-wide rollout of smart meters as soon as practicable. Since the Q2 1920 (30th September 2019) baseline project end date of 31/12/24, the following primary project actions have impacted the original Q2 baseline project end date; - A thorough evaluation of the new regulatory framework consultation responses has been conducted. - The impact of COVID-19 is being considered with key stakeholders and assessed by the Programme.","narrativeClaimKind":null},{"id":"DECC_0010_1112-Q1","year":2021,"name":"Smart Metering Implementation Programme","department":"BEIS","category":"Infrastructure and Construction","description":"The Programme aims to replace existing traditional gas and electricity meters across Great Britain with smart gas and electricity meters resulting in a cleaner, cheaper and more reliable energy system. Smart meters are a key enabler of technologies such as electric vehicles, smart tariffs and microgeneration to be efficiently integrated with renewable energy sources, underpinning the cost-effective delivery of Government's net zero commitment.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber. This is primarily due to the following factors: The IPA and SRO Delivery Confidence Assessment (DCA) rating has continued to be Amber, due primarily to the following factors; - There were 23.6 million smart and advanced meters operating across Great Britain as of end December 2020 - A new regulatory framework was announced in June 2020 for implementation in July 2021. - Re-mobilisation support across industry delivery partners was established to respond to the impact of COVID-19. Industry has made good progress in re-mobilising workforces and BEIS has continued to provide support to industry through the latest national lockdown. - Customer smart meter eligibility is increasing following positive developments on resolution of residual technical issues. - BEIS continues to work with energy suppliers to increase consumer uptake through improved consumer engagement and operational fulfilment activities, supported by consumer policies, and to drive faster progress towards a market wide roll-out.","startDate":"2009-12-02","endDate":"2025-06-30","scheduleNarrative":"Compared to financial year 19/20-Q2, the project's end-date increased from 31 December 2024 to 30 June 2025 . This is primarily due to the following factors: Energy suppliers were given an additional six months to meet their smart metering obligations, recognising that COVID-19 and lockdowns restricted energy suppliers' ability to enter premises. The scheduled baseline project end date is now 30 June 2025.","fyBaseline":1139.18,"fyForecast":1139.86,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%. Budget variance less than 5%","wholeLifeCost":20136.95,"costNarrative":"Compared to financial year 19/20-Q2, the projects Baseline Whole Life Cost remained at �20136.95m. This is primarily due to the following factors: In comparison with 19/20 Q2 the Baseline Whole Life Cost has remained constant.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber. This is primarily due to the following factors: The IPA and SRO Delivery Confidence Assessment (DCA) rating has continued to be Amber, due primarily to the following factors; - There were 23.6 million smart and advanced meters…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 19/20-Q2, the project's end-date increased from 31 December 2024 to 30 June 2025 . This is primarily due to the following factors: Energy suppliers were given an additional six months to meet their smart metering obligations, recognising that COVID-19 and lockdowns restricted energy suppliers' ability to enter premises. The scheduled baseline project end date is now 30 June 2025.","narrativeClaimKind":null},{"id":"DECC_0010_1112-Q1","year":2022,"name":"Smart Metering Implementation Programme","department":"BEIS","category":"Infrastructure and Construction","description":"The Programme aims to replace existing traditional gas and electricity meters across Great Britain with smart gas and electricity meters resulting in a cleaner, cheaper and more reliable energy system. Smart meters are a key enabler of technologies such as electric vehicles, smart tariffs and microgeneration to be efficiently integrated with renewable energy sources, underpinning the cost-effective delivery of Government's net zero commitment.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 20/21-Q4, the Delivery Confidence Assessment rating at 21/22-Q4 remained at Amber The IPA and SRO Delivery Confidence Assessment (DCA) rating has continued to be Amber, due primarily to the following factors: - There were 27.8 million smart and advanced meters operating across Great Britain as of end December 2021. - A new 4 year regulatory framework was implementation on 1st January 2022. - Re-mobilisation support across industry delivery partners was established to respond to the impact of COVID-19. Industry has made good progress in re-mobilising workforces and BEIS has continued to provide support to industry. - Customer smart meter eligibility is increasing following positive developments on resolution of residual technical issues. - BEIS continues to work with energy suppliers to increase consumer uptake through improved consumer engagement and operational fulfilment activities, supported by consumer policies, and to drive faster progress towards a market wide roll-out.","startDate":"2009-12-02","endDate":"2025-12-31","scheduleNarrative":"Compared to 2021-Q4, your project end-date increased from 30 JUN 2025 to 31 DEC 2025 . This is primarily due to the following factors: The obligation on energy suppliers to take all reasonable steps to install smart meters was extended by six months to 31 December 2021 to enable them to manage disruption caused by COVID-19. Consistent with this decision, the new four-year Targets Framework commenced on 1 January 2022 and will end on 31 December 2025.","fyBaseline":9.9,"fyForecast":9.9,"fyVariance":0.0,"varianceNarrative":"The budget variance is inferior or equal to 5%.","wholeLifeCost":20147.0,"costNarrative":"Compared to2021-Q4, the projects Baseline Whole Life Cost increased from 20136.95 (£m) to 20146.85 (£m). This is primarily due to the following factors: The baseline Whole Life Cost has increased from £20,136.95m to £20,146.85 as it now includes the agreed programme costs for 2021/2022 which were confirmed through the BEIS business planning process.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Delivery Confidence Assessment rating at 21/22-Q4 remained at Amber The IPA and SRO Delivery Confidence Assessment (DCA) rating has continued to be Amber, due primarily to the following factors: - There were 27.8 million smart and advanced meters operating across Great Britain as of end December 2021. - A new 4 year…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to 2021-Q4, your project end-date increased from 30 JUN 2025 to 31 DEC 2025 . This is primarily due to the following factors: The obligation on energy suppliers to take all reasonable steps to install smart meters was extended by six months to 31 December 2021 to enable them to manage disruption caused by COVID-19. Consistent with this decision, the new four-year Targets Framework commenced on 1 January 2022 and will end on 31 December 2025.","narrativeClaimKind":null},{"id":"DECC_0010_1112-Q1","year":2023,"name":"Smart Metering Implementation Programme","department":"DESNZ","category":"Infrastructure and Construction","description":"The Programme aims to replace existing traditional gas and electricity meters across Great Britain with smart gas and electricity meters resulting in a cleaner, cheaper and more reliable energy system. Smart meters are a key enabler of technologies such as electric vehicles, smart tariffs and microgeneration to be efficiently integrated with renewable energy sources, underpinning the cost-effective delivery of Government's net zero commitment.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 21/22-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. - There were 32.4 million smart and advanced meters operating across Great Britain as of end March 2023.- A new 4-year regulatory framework was implemented on 1st January 2022 with minimum installation targets set for energy suppliers for 2022 and 2023.- Work is underway on the Mid-Point review of the Targets Framework. A consultation on minimum installation targets for years 3 and 4 of the Framework (2024 and 2025) closed on 21 March and responses are now being reviewed.- Customer smart meter technical eligibility moved to 99% in January 2023 with the controlled commencement of Alternative Home Area Network solution installations. Deployment is due to enter the mass rollout phase later in 2023. - DESNZ/SMIP continues to work with energy suppliers to improve consumer engagement and operational fulfilment activities to strengthen and increase consumer uptake and to continue to support installations at scale.","startDate":"2009-12-02","endDate":"2025-12-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2025-12-31. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2025-12-31. This is primarily due to the following factors. The new four-year installation Targets Framework commenced on 1 January 2022 and will end on 31 December 2025.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"The budget variance is inferior or equal to 5%.","wholeLifeCost":20177.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 increased from 20147m. to 20177m. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 increased from 20147m. to 20177m. This is primarily due to the following factors. The whole life cost figure now reflecting the baseline budgets that were confirmed as part of the Spending Review 2021.","benefits":34130.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 34130m. Benefits arise to a number of different groups - to energy consumers in the form of bill savings through reduced consumption and time savings through reduced need to interact with the metering system, to energy suppliers in the form of operational efficiencies (e.g. no more site visits for meter reads, fewer calls to complain about inaccurate / estimated bills), to distribution network operators (e.g. in the form of more targeted investment decisions) and to society as a whole (e.g. in the form of reduced carbon emissions). Benefits break down into around 39% directly to consumers, around 50% to the energy industry (which we expect will be passed through to consumers in the form of lower energy prices) and around 10% in societal benefits to the UK.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. - There were 32.4 million smart and advanced meters operating across Great Britain as of end March 2023.- A new 4-year regulatory framework was implemented on 1st January…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2025-12-31. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2025-12-31. This is primarily due to the following factors. The new four-year installation Targets Framework commenced on 1 January 2022 and will end on 31 December 2025.","narrativeClaimKind":null},{"id":"DECC_0010_1112-Q1","year":2024,"name":"Smart Metering Implementation Programme","department":"DESNZ","category":"Infrastructure and Construction","description":"The Programme aims to replace existing traditional gas and electricity meters across Great Britain with smart gas and electricity meters resulting in a cleaner, cheaper and more reliable energy system. Smart meters are a key enabler of technologies such as electric vehicles, smart tariffs and microgeneration to be efficiently integrated with renewable energy sources, underpinning the cost-effective delivery of Government's net zero commitment.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The IPA and SRO DCA rating has continued to be Amber, based on the following: - There were 35.5 million smart and advanced meters operating across Great Britain at the end of March 2024. - Continuing implementation of a 4-year regulatory framework to the end of 2025 which sets minimum annual installation targets for energy suppliers. This ensures that suppliers continue to deliver new installations at scale, bringing smart metering benefits to consumers, such as feedback on energy consumption (evaluation shows this leads to reductions in energy use), accurate energy bills and improved customer service. - Continued collaboration with energy suppliers to recruit, train and maintain the installer workforce required for delivering smart meters and the supporting consumer engagement (e.g. energy efficiency advice). - Driving the 4G Transition including operational planning, to enable an efficient transition to 4G installs and completion of the 4G upgrade for 2G/3G Communication Hubs by 2033.","startDate":"2009-12-02","endDate":"2025-12-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2025-12-31. This is primarily due to the following factors. The new four-year installation Targets Framework commenced on 1 January 2022 and will end on 31 December 2025.","fyBaseline":1320.98,"fyForecast":1320.98,"fyVariance":0.0,"varianceNarrative":"The budget variance is inferior or equal to 5%.","wholeLifeCost":20177.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 remained at 20177m. This is primarily due to the following factors. The whole life cost figure now reflecting the baseline budgets that were confirmed as part of the Spending Review 2021.","benefits":34130.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 34130m. Benefits arise to a number of different groups - to energy consumers in the form of bill savings through reduced consumption and time savings through reduced need to interact with the metering system, to energy suppliers in the form of operational efficiencies (e.g. no more site visits for meter reads, fewer calls to complain about inaccurate / estimated bills), to distribution network operators (e.g. in the form of more targeted investment decisions) and to society as a whole (e.g. in the form of reduced carbon emissions). Benefits break down into around 39% directly to consumers, around 50% to the energy industry (which we expect will be passed through to consumers in the form of lower energy prices) and around 10% in societal benefits to the UK.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The IPA and SRO DCA rating has continued to be Amber, based on the following: - There were 35.5 million smart and advanced meters operating across Great Britain at the end of…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2025-12-31. This is primarily due to the following factors. The new four-year installation Targets Framework commenced on 1 January 2022 and will end on 31 December 2025.","narrativeClaimKind":null},{"id":"DECC_0010_1112-Q1","year":2025,"name":"Smart Metering Implementation Programme","department":"DESNZ","category":"Infrastructure and Construction","description":"The Smart Metering Implementation Programme seeks to replace existing traditional gas and electricity meters across Great Britain with smart meters resulting in a cleaner, cheaper and more flexible energy system. Smart meters deliver consumers with near-real time information on their energy consumption to help them control energy use, save energy and reduce bills. They also enable technologies such as electric vehicles to be efficiently and cost-effectively integrated with renewable energy sources, supporting the cost-effective delivery of Government’s 2030 Clean Power and Net Zero commitments. The government is committed to ensuring that households and small businesses can benefit from smart meters as soon as possible. Regulatory drivers are in place to drive industry investment in smart metering at scale.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Smart metering continues to deliver benefits to consumers, such as engagement on energy consumption, accurate energy bills and improved customer service, and is key to the 2030 Clean Power Mission and enabling Net Zero. There were 39 million smart and advanced meters operating across Great Britain at the end of Q1 2025. The 4-year Regulatory Framework to the end of 2025 sets minimum annual installation targets for energy suppliers and continues to drive suppliers to invest appropriately to deliver new installations at scale. There is continued collaboration with stakeholders including energy suppliers and the Data Communications Company to drive improvements in engagement, appointment fulfilment and the operation of meters, and ensuring technology roadmaps for the next decade are suitably developed and addressed. Driving good progress on an efficient transition from 2G/3G to 4G Communications Hubs (4G CHs) by 2033. Actively developing consultation proposals for the Regulatory Framework required for post 2025 to give investment clarity to industry. The size, scale and complexity of such an industry change programme with numerous energy sector stakeholders reflects why SMIP has remained with an AMBER rating.","startDate":"2009-12-02","endDate":"2030-12-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/12/2025 to 31/12/2030. This is primarily due to the following factors‚ SMIP’s current 4-year Regulatory Framework runs to the end of 2025 and the project end-date was set to mirror this timing. The existing Regulatory Framework sets minimum annual installation targets for energy suppliers and continues to drive suppliers to invest appropriately to deliver new installations at scale. We are actively developing consultation proposals for the Regulatory Framework required for post 2025 to give investment clarity to industry and support the Government’s 2030 Clean Power mission – the project end-date has been updated to reflect this.","fyBaseline":1320.98,"fyForecast":1320.98,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%. The budget variance is less than or equal to 5%.","wholeLifeCost":20177.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 20177. This is primarily due to the following factors‚ The total whole life cost figures in this return are presented in undiscounted nominal terms, for comparability with other programmes. The figure differs from the total cost figure in the Smart Metering Implementation Programme’s 2019 CBA, which is expressed in 2011 prices discounted to 2019 in line with HM Treasury appraisal guidance. This reflects the latest economic appraisal of the costs (and benefits) of the programme, including (but not limited to) costs from new assets and installation, setting up new communications infrastructure, and benefits including (but not limited to) reduced energy consumption, reduced greenhouse gas emissions, reduced site visits by suppliers, improved network management, and improved customer switching.","benefits":34130.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 34130. This is primarily due to the following factors‚ The total whole life benefits figures in this return are presented in undiscounted nominal terms, for comparability with other programmes. The figure differs from the total benefit figure in the Smart Metering Implementation Programme’s 2019 CBA, which is expressed in 2011 prices discounted to 2019 in line with HM Treasury appraisal guidance. This reflects the latest economic appraisal of the benefits (and costs) of the programme, including (but not limited to) costs from new assets and installation, setting up new communications infrastructure, and benefits including (but not limited to) reduced energy consumption, reduced greenhouse gas emissions, reduced site visits by suppliers, improved network management, and improved customer switching.","themes":["Cost & funding","Delivery & schedule","Technical & integration"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Smart metering continues to deliver benefits to consumers, such as engagement on energy consumption, accurate energy bills and improved customer service, and is key…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/12/2025 to 31/12/2030. This is primarily due to the following factors‚ SMIP’s current 4-year Regulatory Framework runs to the end of 2025 and the project end-date was set to mirror this timing. The existing Regulatory Framework sets minimum annual installation targets for energy suppliers and continues to drive suppliers to invest appropriately to deliver new installations at scale. We are actively developing consultation proposals for the Regulatory Framework required for post 2025 to give investment clarity to industry and support the Government’s 2030 Clean Power mission – the project end-date has been updated to reflect this.","narrativeClaimKind":null},{"id":"DECC_0010_1112-Q1","year":2026,"name":"Smart Metering Implementation Programme","department":"DESNZ","category":"Infrastructure and Construction","description":"The Smart Metering Implementation Programme is replacing existing traditional gas and electricity meters across Great Britain with smart meters. Smart meters deliver near-real time information to consumers on their energy consumption, and helps them to control energy use, save energy and reduce bills. They also enable technologies such as electric vehicles, heat pumps, batteries and solar panels to be efficiently and cost-effectively integrated to a flexible energy system that supports the cost-effective delivery of government’s Clean Power 2030 and Net Zero commitments. The Government is committed to ensuring that all households and small businesses can benefit from smart meters as soon as possible. Regulatory drivers are in place to drive industry investment in the delivery and operation of smart metering at scale.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at AMBER. This is primarily due to the following factors: Smart metering continues to deliver benefits to consumers, such as engagement on energy consumption, accurate energy bills and improved customer service, and is key to the 2030 Clean Power Mission. There were 41 million smart and advanced meters operating across Great Britain at the end of 2025 and 71% of all meters are now smart or advanced. A new regulatory framework is now in place to drive industry to maintain high levels of operational performance whilst effectively completing the rollout by 2030. There is continued collaboration with stakeholders including energy suppliers and the Data Communications Company to drive further improvements in engagement, appointment fulfilment and operation of meters, and ensuring technology roadmaps for the next decade are suitably developed and addressed. Improvements to the network continue to be made including deployment of 4G Communications Hubs at scale and launch of the Virtual Wide Area Network solution that allows consumers to access smart metering services through their broadband (with consent).","startDate":"2009-12-02","endDate":"2030-12-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same as last year at 31/12/2030. This is primarily due to the following factors: SMIP continues to make good progress with the successful delivery of the smart meter rollout in delivering its strategic outcomes. Progress continues with circa.90k+ gross installs per week and a continued increasing proportion of meters installed (71% as of end 2025) and operating as they should (92.3%). The new regulatory framework to 2030 will continue to deliver industry investment at scale and drive high levels of operational performance and smart coverage, which are key to the 2030 Clean Power Mission.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":20176.55,"costNarrative":"The programme’s departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) is 20177. The total whole life cost figures are presented in undiscounted nominal terms. The figure differs from the total cost figure in the Smart Metering Implementation Programme’s 2019 CBA, which is expressed in 2011 prices discounted to 2019 in line with HM Treasury appraisal guidance. This reflects the latest economic appraisal of the costs of the programme, including (but not limited to) costs from new assets, installation visits and setting up and operating the new communications infrastructure.","benefits":34130.34,"benefitsNarrative":"Compared to financial year 24/25-Q4, the programme’s departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained the same as last year at 34130. This is primarily due to the following factors: The total whole life benefits figures are presented in undiscounted nominal terms, for comparability with other programmes. The figure differs from the total benefit figure in the Smart Metering Implementation Programme’s 2019 CBA, which is expressed in 2011 prices discounted to 2019 in line with HM Treasury appraisal guidance. This reflects the latest economic appraisal of the benefits of the programme, including (but not limited to) benefits from reduced energy consumption, reduced greenhouse gas emissions, reduced site visits by suppliers, improved network management, and improved customer switching.","themes":["Cost & funding","Delivery & schedule","Technical & integration","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at AMBER. This is primarily due to the following factors: Smart metering continues to deliver benefits to consumers, such as engagement on energy consumption, accurate energy bills and improved customer service, and is key to the 2030 Clean Power…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same as last year at 31/12/2030. This is primarily due to the following factors: SMIP continues to make good progress with the successful delivery of the smart meter rollout in delivering its strategic outcomes. Progress continues with circa.90k+ gross installs per week and a continued increasing proportion of meters installed (71% as of end 2025) and operating as they should (92.3%). The new regulatory framework to 2030 will continue to deliver industry investment at scale and drive high levels of operational performance and smart coverage, which are key to the 2030 Clean Power Mission.","narrativeClaimKind":null}],"previous":{"id":"DECC_0010_1112-Q1","year":2025,"name":"Smart Metering Implementation Programme","department":"DESNZ","category":"Infrastructure and Construction","description":"The Smart Metering Implementation Programme seeks to replace existing traditional gas and electricity meters across Great Britain with smart meters resulting in a cleaner, cheaper and more flexible energy system. Smart meters deliver consumers with near-real time information on their energy consumption to help them control energy use, save energy and reduce bills. They also enable technologies such as electric vehicles to be efficiently and cost-effectively integrated with renewable energy sources, supporting the cost-effective delivery of Government’s 2030 Clean Power and Net Zero commitments. The government is committed to ensuring that households and small businesses can benefit from smart meters as soon as possible. Regulatory drivers are in place to drive industry investment in smart metering at scale.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Smart metering continues to deliver benefits to consumers, such as engagement on energy consumption, accurate energy bills and improved customer service, and is key to the 2030 Clean Power Mission and enabling Net Zero. There were 39 million smart and advanced meters operating across Great Britain at the end of Q1 2025. The 4-year Regulatory Framework to the end of 2025 sets minimum annual installation targets for energy suppliers and continues to drive suppliers to invest appropriately to deliver new installations at scale. There is continued collaboration with stakeholders including energy suppliers and the Data Communications Company to drive improvements in engagement, appointment fulfilment and the operation of meters, and ensuring technology roadmaps for the next decade are suitably developed and addressed. Driving good progress on an efficient transition from 2G/3G to 4G Communications Hubs (4G CHs) by 2033. Actively developing consultation proposals for the Regulatory Framework required for post 2025 to give investment clarity to industry. The size, scale and complexity of such an industry change programme with numerous energy sector stakeholders reflects why SMIP has remained with an AMBER rating.","startDate":"2009-12-02","endDate":"2030-12-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/12/2025 to 31/12/2030. This is primarily due to the following factors‚ SMIP’s current 4-year Regulatory Framework runs to the end of 2025 and the project end-date was set to mirror this timing. The existing Regulatory Framework sets minimum annual installation targets for energy suppliers and continues to drive suppliers to invest appropriately to deliver new installations at scale. We are actively developing consultation proposals for the Regulatory Framework required for post 2025 to give investment clarity to industry and support the Government’s 2030 Clean Power mission – the project end-date has been updated to reflect this.","fyBaseline":1320.98,"fyForecast":1320.98,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%. The budget variance is less than or equal to 5%.","wholeLifeCost":20177.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 20177. This is primarily due to the following factors‚ The total whole life cost figures in this return are presented in undiscounted nominal terms, for comparability with other programmes. The figure differs from the total cost figure in the Smart Metering Implementation Programme’s 2019 CBA, which is expressed in 2011 prices discounted to 2019 in line with HM Treasury appraisal guidance. This reflects the latest economic appraisal of the costs (and benefits) of the programme, including (but not limited to) costs from new assets and installation, setting up new communications infrastructure, and benefits including (but not limited to) reduced energy consumption, reduced greenhouse gas emissions, reduced site visits by suppliers, improved network management, and improved customer switching.","benefits":34130.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 34130. This is primarily due to the following factors‚ The total whole life benefits figures in this return are presented in undiscounted nominal terms, for comparability with other programmes. The figure differs from the total benefit figure in the Smart Metering Implementation Programme’s 2019 CBA, which is expressed in 2011 prices discounted to 2019 in line with HM Treasury appraisal guidance. This reflects the latest economic appraisal of the benefits (and costs) of the programme, including (but not limited to) costs from new assets and installation, setting up new communications infrastructure, and benefits including (but not limited to) reduced energy consumption, reduced greenhouse gas emissions, reduced site visits by suppliers, improved network management, and improved customer switching.","themes":["Cost & funding","Delivery & schedule","Technical & integration"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Smart metering continues to deliver benefits to consumers, such as engagement on energy consumption, accurate energy bills and improved customer service, and is key…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/12/2025 to 31/12/2030. This is primarily due to the following factors‚ SMIP’s current 4-year Regulatory Framework runs to the end of 2025 and the project end-date was set to mirror this timing. The existing Regulatory Framework sets minimum annual installation targets for energy suppliers and continues to drive suppliers to invest appropriately to deliver new installations at scale. We are actively developing consultation proposals for the Regulatory Framework required for post 2025 to give investment clarity to industry and support the Government’s 2030 Clean Power mission – the project end-date has been updated to reflect this.","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":0,"attentionScore":18,"attentionReasons":["Current published delivery confidence is Amber"]},{"id":"BEIS_0153_2223-Q2","year":2026,"name":"Spherical Tokamak for Energy Production","department":"DESNZ","category":"Infrastructure and Construction","description":"The STEP (Spherical Tokamak for Energy Production) Programme is the UK Government’s flagship mission to design, demonstrate and de‑risk a prototype fusion power plant, while creating the industrial, commercial and regulatory foundations of a future UK fusion energy sector. STEP is therefore not just an infrastructure project. It is a national capability‑building programme, with delivery of a prototype plant at West Burton by the 2040s acting as the anchor for wider economic, technological and industrial outcomes.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Delivery Confidence Has remained Amber. This reflects sustained progress across design maturity, technology demonstration, commercial integration and site enablement, balanced against the inherent uncertainty and complexity of delivering a first‑of‑a‑kind fusion programme. While key technical risks remain these are well understood, actively managed, and supported by improving delivery capability, governance and industrial engagement.","startDate":"2018-07-16","endDate":"2045-04-01","scheduleNarrative":"The project’s end‑date has remained unchanged. This reflects a deliberate decision to maintain the overall schedule while incorporating increased technical maturity achieved through successive design baselines, early Tranche 2a delivery, and strengthened delivery integration. Key enabling activities—including site acquisition progress, Construction Partner onboarding, and clearer understanding of critical technical risks—have improved schedule confidence without requiring changes to the headline end‑date. We expect to provide indicative ranges for the end date Q3 FY26/27.","fyBaseline":102.48,"fyForecast":103.13,"fyVariance":0.63,"varianceNarrative":"The programme delivered a 1% underspend against the Control Total, closely aligned to the late‑period forecast and demonstrating strong financial control. Variances largely reflect the planned crystallisation of known delivery risks rather than new in‑year pressures, with year‑end performance supported by active financial management and improved accruals, and no material impact anticipated into the following year.","wholeLifeCost":null,"costNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","benefits":null,"benefitsNarrative":"Exempt under Section 22 - Information intended for future publication","themes":["Delivery & schedule","Technical & integration","Cost & funding","Scope & requirements"],"evidenceExcerpt":"Delivery Confidence Has remained Amber. This reflects sustained progress across design maturity, technology demonstration, commercial integration and site enablement, balanced against the inherent uncertainty and complexity of delivering a first‑of‑a‑kind fusion programme. While key technical risks remain these are well understood, actively managed, and…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project’s end‑date has remained unchanged. This reflects a deliberate decision to maintain the overall schedule while incorporating increased technical maturity achieved through successive design baselines, early Tranche 2a delivery, and strengthened delivery integration. Key enabling activities—including site acquisition progress, Construction Partner onboarding, and clearer understanding of critical technical risks—have improved schedule confidence without requiring changes to the headline end‑date. We expect to provide indicative ranges for the end date Q3 FY26/27.","narrativeClaimKind":null,"history":[{"id":"BEIS_0153_2223-Q2","year":2023,"name":"Spherical Tokamak for Energy Production","department":"DESNZ","category":"Infrastructure and Construction","description":"Spherical Tokamak for Energy Production (STEP) is a staged programme to design and build, by 2040, a prototype fusion energy plant capable of delivering net-energy to the grid. STEP will demonstrate the technical and commercial viability of fusion, through a design that would be cheaper than other approaches to fusion and through developing a supply chain for this embryonic technology. This will extend the existing UK lead in this field, and place the UK in pole position to design, manufacture and export the first fleet of low-carbon fusion energy plants into an international clean energy market potentially worth Tns p.a.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 is Amber. This is primarily due to the following factors. IPA gate 0/2 review completed 24/03. Delivery Confidence Assessment - Amber with 12 recommendations.Action plan put in place to support Outline Business Case with second IPA review to be conducted in June ahead of Business case Review in July.The scale of ambition, and risk for Tranche 2 is large. Key areas to address to support this level of ambition were identified by IPA as:-Increase fidelity of reporting to understand progress to plan and risk impacts.-Implementation of Review, Check, Assure to enable agile response to emerging information.-Increase in capability commensurate with the increasing scale of the programme going into Tranche 2.-Increased clarity on cross government sponsorship responsibilities.","startDate":"2018-07-16","endDate":"2024-03-31","scheduleNarrative":"The project's end-date at 22/23-Q4 is 2024-03-31. This is primarily due to the following factors. STEP Tranche 1 completes 31/03/2024, in line with original business case and following completion of deliverables identified in original business case. Business Case process is in train to authorise STEP Tranche 2a activity developing the programme out to 2028.","fyBaseline":66.19,"fyForecast":70.94,"fyVariance":7.0,"varianceNarrative":"Underspend in previous financial years was reallocated in last spending review. Variance is against original business case spend profile. Current forecast including this variance is within the overall envelop of the original business case.","wholeLifeCost":218.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 22/23-Q4 is 218m. This is primarily due to the following factors. This is the first Annual Reporting for the Programme. The STEP concept design business case allocated 217.6m for this concept phase. The programme is currently forecasting 217.6m against the scope of the original business case.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. The project did not provide departmental-agree monetised benefits at 22/23-Q4.","themes":["Approvals & decisions","Governance & assurance","Cost & funding","Delivery & schedule"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 is Amber. This is primarily due to the following factors. IPA gate 0/2 review completed 24/03. Delivery Confidence Assessment - Amber with 12 recommendations.Action plan put in place to support Outline Business Case with second IPA review to be conducted in June ahead…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 22/23-Q4 is 2024-03-31. This is primarily due to the following factors. STEP Tranche 1 completes 31/03/2024, in line with original business case and following completion of deliverables identified in original business case. Business Case process is in train to authorise STEP Tranche 2a activity developing the programme out to 2028.","narrativeClaimKind":null},{"id":"BEIS_0153_2223-Q2","year":2024,"name":"Spherical Tokamak for Energy Production","department":"DESNZ","category":"Infrastructure and Construction","description":"Spherical Tokamak for Energy Production (STEP) is a staged programme to design and build, targetting 2040, a prototype fusion energy plant capable of delivering net-energy and, through that, developing a UK fusion supply chain. STEP will demonstrate the technical and commercial viability of fusion through a design that would be cheaper than other approaches to fusion and through developing a supply chain for this embryonic technology. This will extend the existing UK lead in this field, placing the UK in the international lead of design and manufacture of fusion plant and systems, supporting a global fusion market worth Tns.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. This reflects the intrinsically high ambition and accepted risk of STEP in driving a new strategic technology with potentially global benefits, balanced with good early progress but increasing delivery challenging over time. IPA gate 0/2 review completed 24/03. Delivery Confidence Assessment - Amber with 12 recommendations. Action plan put in place to support Outline Business Case with second IPA review was conducted in June ahead of Business case Review in July. The Delivery confidence Assessment was retained as Amber with 7 of the 12 recommendations from March closed and 5 acknowledged as 'In-Progress'. Outline Business Case was approved Aug 23 and Full Business Case will be submitted autumn 24. Key areas to address to support this level of ambition were identified by IPA as: -Increase fidelity of reporting to understand progress to plan and risk impacts (on track - new reporting in place through Programme Board). -Implementation of Review, Check, Assure to enable agile response to emerging information (on track) -Increase in capability commensurate with the increasing scale of the programme going into Tranche 2 (on track; new delivery body - UKIFS - planned to assume programme control from Nov 24) -Increased clarity on cross government sponsorship responsibilities (addressed via DESNZ sponsorship and new Fusion Strategy Delivery Board)","startDate":"2018-07-16","endDate":"2045-04-01","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 increased from 2024-03-31 to 2045-04-01. This is primarily due to the following factors. This Project End date relates to the full programme rather than the current approved Phase. Year 2045, is an early estimate of the Spherical Tokamak plant's handover date to ongoing operations and will be revised as the programme plan is matured. The baseline date was erroneously referring to Tranche 1 completion of March 2024. Tranche 1 is now completed on time.","fyBaseline":51.84,"fyForecast":70.22,"fyVariance":35.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. Underspend in previous financial years was reallocated in last spending review. Variance is against original business case spend profile. In year spend including this variance is within the overall envelope of the original business case.","wholeLifeCost":238.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 increased from 218m. to 238m. This is primarily due to the following factors. The change in budgeted cost is due additional 20m funding approved in March 2023 for Tranche 1.","benefits":0.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 0m. Benefit will be identified as part of Tranche 2A which starts in FY 25-26","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. This reflects the intrinsically high ambition and accepted risk of STEP in driving a new strategic technology with potentially global benefits, balanced with good…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 increased from 2024-03-31 to 2045-04-01. This is primarily due to the following factors. This Project End date relates to the full programme rather than the current approved Phase. Year 2045, is an early estimate of the Spherical Tokamak plant's handover date to ongoing operations and will be revised as the programme plan is matured. The baseline date was erroneously referring to Tranche 1 completion of March 2024. Tranche 1 is now completed on time.","narrativeClaimKind":null},{"id":"BEIS_0153_2223-Q2","year":2025,"name":"Spherical Tokamak for Energy Production","department":"DESNZ","category":"Infrastructure and Construction","description":"The first of its kind, STEP is the UK's major technology and infrastructure programme to build a prototype fusion powerplant and, through that, to build a new industrial sector in which the UK will play a leading global role as fusion energy becomes a commercial reality. STEP is industrial strategy in action, generating short, medium, and longer-term economic growth and local social benefits in and around the site in north Nottinghamshire. The physical plant will demonstrate net energy, fuel self sufficiency and a viable route to plant maintenance. This will pave the way for the potential development of a fleet of future fusion powerplants around the world and the commercialisation of fusion energy, but the lasting legacy and the source of near-term value for the UK is stimulation of a supply chain that can support multiple fusion programmes worldwide as that industry grows, and that delivers additional benefit through spin-off technologies.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The intrinsic challenges of developing novel technologies and building a new industrial sector create delivery risks that could impact timelines, cost, and stakeholder confidence.","startDate":"2018-07-16","endDate":null,"scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 01/04/2045. This is primarily due to the following factors‚ the intrinsic challenges of developing novel technologies and building a new industrial sector create delivery risks that could impact timelines.","fyBaseline":67.4,"fyForecast":67.23,"fyVariance":0.25,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":null,"costNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","benefits":null,"benefitsNarrative":"Section 22 - Information intended for future publication","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The intrinsic challenges of developing novel technologies and building a new industrial sector create delivery risks that could impact timelines, cost, and…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 01/04/2045. This is primarily due to the following factors‚ the intrinsic challenges of developing novel technologies and building a new industrial sector create delivery risks that could impact timelines.","narrativeClaimKind":null},{"id":"BEIS_0153_2223-Q2","year":2026,"name":"Spherical Tokamak for Energy Production","department":"DESNZ","category":"Infrastructure and Construction","description":"The STEP (Spherical Tokamak for Energy Production) Programme is the UK Government’s flagship mission to design, demonstrate and de‑risk a prototype fusion power plant, while creating the industrial, commercial and regulatory foundations of a future UK fusion energy sector. STEP is therefore not just an infrastructure project. It is a national capability‑building programme, with delivery of a prototype plant at West Burton by the 2040s acting as the anchor for wider economic, technological and industrial outcomes.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Delivery Confidence Has remained Amber. This reflects sustained progress across design maturity, technology demonstration, commercial integration and site enablement, balanced against the inherent uncertainty and complexity of delivering a first‑of‑a‑kind fusion programme. While key technical risks remain these are well understood, actively managed, and supported by improving delivery capability, governance and industrial engagement.","startDate":"2018-07-16","endDate":"2045-04-01","scheduleNarrative":"The project’s end‑date has remained unchanged. This reflects a deliberate decision to maintain the overall schedule while incorporating increased technical maturity achieved through successive design baselines, early Tranche 2a delivery, and strengthened delivery integration. Key enabling activities—including site acquisition progress, Construction Partner onboarding, and clearer understanding of critical technical risks—have improved schedule confidence without requiring changes to the headline end‑date. We expect to provide indicative ranges for the end date Q3 FY26/27.","fyBaseline":102.48,"fyForecast":103.13,"fyVariance":0.63,"varianceNarrative":"The programme delivered a 1% underspend against the Control Total, closely aligned to the late‑period forecast and demonstrating strong financial control. Variances largely reflect the planned crystallisation of known delivery risks rather than new in‑year pressures, with year‑end performance supported by active financial management and improved accruals, and no material impact anticipated into the following year.","wholeLifeCost":null,"costNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","benefits":null,"benefitsNarrative":"Exempt under Section 22 - Information intended for future publication","themes":["Delivery & schedule","Technical & integration","Cost & funding","Scope & requirements"],"evidenceExcerpt":"Delivery Confidence Has remained Amber. This reflects sustained progress across design maturity, technology demonstration, commercial integration and site enablement, balanced against the inherent uncertainty and complexity of delivering a first‑of‑a‑kind fusion programme. While key technical risks remain these are well understood, actively managed, and…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project’s end‑date has remained unchanged. This reflects a deliberate decision to maintain the overall schedule while incorporating increased technical maturity achieved through successive design baselines, early Tranche 2a delivery, and strengthened delivery integration. Key enabling activities—including site acquisition progress, Construction Partner onboarding, and clearer understanding of critical technical risks—have improved schedule confidence without requiring changes to the headline end‑date. We expect to provide indicative ranges for the end date Q3 FY26/27.","narrativeClaimKind":null}],"previous":{"id":"BEIS_0153_2223-Q2","year":2025,"name":"Spherical Tokamak for Energy Production","department":"DESNZ","category":"Infrastructure and Construction","description":"The first of its kind, STEP is the UK's major technology and infrastructure programme to build a prototype fusion powerplant and, through that, to build a new industrial sector in which the UK will play a leading global role as fusion energy becomes a commercial reality. STEP is industrial strategy in action, generating short, medium, and longer-term economic growth and local social benefits in and around the site in north Nottinghamshire. The physical plant will demonstrate net energy, fuel self sufficiency and a viable route to plant maintenance. This will pave the way for the potential development of a fleet of future fusion powerplants around the world and the commercialisation of fusion energy, but the lasting legacy and the source of near-term value for the UK is stimulation of a supply chain that can support multiple fusion programmes worldwide as that industry grows, and that delivers additional benefit through spin-off technologies.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The intrinsic challenges of developing novel technologies and building a new industrial sector create delivery risks that could impact timelines, cost, and stakeholder confidence.","startDate":"2018-07-16","endDate":null,"scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 01/04/2045. This is primarily due to the following factors‚ the intrinsic challenges of developing novel technologies and building a new industrial sector create delivery risks that could impact timelines.","fyBaseline":67.4,"fyForecast":67.23,"fyVariance":0.25,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":null,"costNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","benefits":null,"benefitsNarrative":"Section 22 - Information intended for future publication","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The intrinsic challenges of developing novel technologies and building a new industrial sector create delivery risks that could impact timelines, cost, and…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 01/04/2045. This is primarily due to the following factors‚ the intrinsic challenges of developing novel technologies and building a new industrial sector create delivery risks that could impact timelines.","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":null,"attentionScore":18,"attentionReasons":["Current published delivery confidence is Amber"]},{"id":"DBT_0296_2526-Q2","year":2026,"name":"Strategic Sites Accelerator (SSA)","department":"DBT","category":"Infrastructure and Construction","description":"The Strategic Sites Accelerator is a key Industrial Strategy programme designed to unlock nationally significant investment opportunities and accelerate their path to delivery. Over the pilot period, we will support a small number of genuinely transformative sites, combining technical expertise with flexible financial tools to help crowd in private capital and unlock investment at pace. Backed by around £600 million of Financial Transactions funding, the Programme is focused on deploying capital where government intervention can be catalytic and help unlock opportunities that may not otherwise progress. The Programme is designed to tackle barriers that can slow down investment, helping strategic sites become investment-ready more quickly.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Delivery Confidence Asssessment rating remains AMBER. Independent assurance concluded that the programme is well developed, with a clear strategic rationale, commercial model and delivery approach. While the programme is progressing well, it remains subject to final HM Treasury approval and has not yet been fully mobilised, meaning some delivery arrangements are still being finalised.","startDate":null,"endDate":null,"scheduleNarrative":"Schedule remains the same.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide costs/schedule information","wholeLifeCost":null,"costNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","benefits":null,"benefitsNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","themes":["Delivery & schedule","Approvals & decisions","Commercial & supply chain","Cost & funding"],"evidenceExcerpt":"The Delivery Confidence Asssessment rating remains AMBER. Independent assurance concluded that the programme is well developed, with a clear strategic rationale, commercial model and delivery approach. While the programme is progressing well, it remains subject to final HM Treasury approval and has not yet been fully mobilised, meaning some delivery…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Schedule remains the same.","narrativeClaimKind":null,"history":[{"id":"DBT_0296_2526-Q2","year":2026,"name":"Strategic Sites Accelerator (SSA)","department":"DBT","category":"Infrastructure and Construction","description":"The Strategic Sites Accelerator is a key Industrial Strategy programme designed to unlock nationally significant investment opportunities and accelerate their path to delivery. Over the pilot period, we will support a small number of genuinely transformative sites, combining technical expertise with flexible financial tools to help crowd in private capital and unlock investment at pace. Backed by around £600 million of Financial Transactions funding, the Programme is focused on deploying capital where government intervention can be catalytic and help unlock opportunities that may not otherwise progress. The Programme is designed to tackle barriers that can slow down investment, helping strategic sites become investment-ready more quickly.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Delivery Confidence Asssessment rating remains AMBER. Independent assurance concluded that the programme is well developed, with a clear strategic rationale, commercial model and delivery approach. While the programme is progressing well, it remains subject to final HM Treasury approval and has not yet been fully mobilised, meaning some delivery arrangements are still being finalised.","startDate":null,"endDate":null,"scheduleNarrative":"Schedule remains the same.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide costs/schedule information","wholeLifeCost":null,"costNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","benefits":null,"benefitsNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","themes":["Delivery & schedule","Approvals & decisions","Commercial & supply chain","Cost & funding"],"evidenceExcerpt":"The Delivery Confidence Asssessment rating remains AMBER. Independent assurance concluded that the programme is well developed, with a clear strategic rationale, commercial model and delivery approach. While the programme is progressing well, it remains subject to final HM Treasury approval and has not yet been fully mobilised, meaning some delivery…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Schedule remains the same.","narrativeClaimKind":null}],"previous":null,"ratingDelta":null,"transition":"Not comparable","endDateDeltaDays":null,"attentionScore":18,"attentionReasons":["Current published delivery confidence is Amber"]},{"id":"DEFRA_0190_2223-Q3","year":2026,"name":"TERRESTRIAL NATURAL CAPITAL ECOSYSTEM ASSESSMENT","department":"DEFRA","category":"Government Transformation and Service Delivery","description":"Defra is developing a collaborative programme to enhance national and local insight into biodiversity, ecosystems, and natural capital assets. This initiative aims to support key environmental policies, including the Environmental Improvement Plan Targets, Environmental Land Management Schemes, and Biodiversity Net Gain. By addressing gaps in existing data and integrating a more comprehensive understanding of ecosystem conditions, the programme will ensure natural capital is fully considered in future decision-making. It aligns with the government's ambitious commitments to environmental protection, both internationally through the Convention on Biodiversity and domestically via the 25 Year Environment Plan.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors‚ confidence has strengthened following the successful publication of the first Analysis Ready Datasets (ARD) in December 2025, demonstrating the programme’s ability to deliver against commitments. This further stems from Defra’s Investment Committee approving the Full Business Case, confirming spend to deliver the NCEA programme through to closure at end 2028/29.However, overall confidence is driven by two key risks: (1) availability of prepared/processed data at the required cadence, and (2) consistency of data quality and assurance across partners. This quarter the programme has been focused on embedding lessons from the first ARD batch to improve predictability. Planning for FY 2026/27 is progressing, including agreement of a quarterly batching plan to provide earliest possible access for internal and external users.","startDate":"2021-04-01","endDate":"2029-03-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same as last year's published end-date for March 2029. This is primarily due to the following factors, the NCEA programme was designed around a 5-year strategic sample to measure environmental condition at a national and regional scale for England’s terrestrial and freshwater landscape. To deliver this the programme needs to run for seven years, the first year focused on setting up the environmental monitoring capability, five years to the field surveys that contribute to the strategic sample and a final year to complete the analysis and publication of the data, produce the Baseline Assessment of Natural Capital and Ecosystems and to undertake programme closure activity.","fyBaseline":61.55,"fyForecast":60.63,"fyVariance":1.5,"varianceNarrative":"The budget variance is -1.6% meaning the programme spent 98.4% of the baseline budget. The small variance is a result of the novel and uncertain nature of Research and Development work resulting in some work across several work packages not being completed in-year as well as some work slipping into the next financial year.”","wholeLifeCost":325.68,"costNarrative":"Compared to financial year 24/25-Q4, the projects departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) decreased from £331m to £328m. The decrease to the departmentally agreed WLC is as a result of certainty around our future year budgets following spending review and business planning exercises in FY25/26. The Programmes final business case covering spend from FY26/27 to FY28/29 was approved by Defra Investment Committee in March 2026 which covers the final two years of our fieldwork and the programmes final year. FY28/29 is needed to complete the lab analyses of the samples, quality assurance and publication of all of the data collected by the programme via Open Government Licence, and publication of the Baseline Assessment of Natural Capital and Ecoystems, that will bring together all the knowledge and information generated by the programme in an overall assessment for England.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 remained at 0. This is primarily due to the following factors‚ NCEA programme produces long-term and wide reaching benefits which extend beyond the reach and lifetime of the programme, making accurate measurement and reporting of monetary benefits unrealistic. The programme will report on non-monetary benefits annually at minimum. The Full Programme Business Case approved by Investment Committee in March 2026, confirms the Programme does not deliver any monetised benefits.","themes":["Cost & funding","Governance & assurance","Technical & integration","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors‚ confidence has strengthened following the successful publication of the first Analysis Ready Datasets (ARD) in December 2025, demonstrating the programme’s ability to deliver against…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same as last year's published end-date for March 2029. This is primarily due to the following factors, the NCEA programme was designed around a 5-year strategic sample to measure environmental condition at a national and regional scale for England’s terrestrial and freshwater landscape. To deliver this the programme needs to run for seven years, the first year focused on setting up the environmental monitoring capability, five years to the field surveys that contribute to the strategic sample and a final year to complete the analysis and publication of the data, produce the Baseline Assessment of Natural Capital and Ecosystems and to undertake programme closure activity.","narrativeClaimKind":null,"history":[{"id":"DEFRA_0190_2223-Q3","year":2023,"name":"Terrestrial Natural Capital Ecosystem Assessment","department":"DEFRA","category":"Government Transformation and Service Delivery","description":"The TNCEA programme establishes the first comprehensive understanding of the condition of natural capital assets across England drawn upon measurements data captured in the field. It puts in place sustainable capabilities to maintain and refresh the data baseline to keep it current in informing and supporting delivery of the 25YEP and related initiatives. The programme takes Defra's progress further towards becoming a data-driven, evidence-based organisation. The programme also incorporates development of systems modelling approaches in order to gain greater understanding of the complex relationships within the captured data, enabling it to be exploited for greater utility by customers for the data. The data generated will be used by a wide-range of stakeholder communities, including; core Defra and its Arms Length Bodies (ALBs), other Government departments, local government, national parks and authorities, utility providers and regulators, NGOs (local and national), private sector companies and academia.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 is Amber. This is primarily due to the following factors. Delivery confidence is currently Amber as we have set up almost all the governance infrastructure within the Programme and we have Programme Business Case approval from Investment Committee. Our Future Delivery Confidence is at Green/Amber as we are in the process of standing up all outstanding Governance Structures, completing the Benefits Plan and are currently filling critical FTE within the Programme.","startDate":"2021-04-01","endDate":"2025-04-01","scheduleNarrative":"The project's end-date at 22/23-Q4 is 2025-04-01. This is primarily due to the following factors. The Project end date is 31/3/25 and is based on the funding approved through the 2021 Spending Review, following a successful pilot funded through the 2020 Spending Review. The current programme will deliver national and some regional scale estimates of ecosystem and natural capital asset extent, location, and condition. To obtain the finer granularity that customers seek for their decisions and evaluations, additional capital funding will be required to extend the programme for 3 years. Stopping at the end of the FY 24/25 would leave additional benefits unrealised. Hence, we are working with partners and stakeholders to identify potential sources of funding for this.","fyBaseline":23.28,"fyForecast":26.2,"fyVariance":13.0,"varianceNarrative":"The programme was unable to spend its full allocation of funding for 22/23 as it took time longer than expected to staff the programme and to procure the services required. This was due in part due to recruitment restrictions introduced in 2022 and difficulties in getting projects through the commercial process in time. We have now recruited four commercial staff to focus on NCEA procurement and filled many of the vacant posts.","wholeLifeCost":125.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 22/23-Q4 is 125m. This is primarily due to the following factors. The programme has a range of controls and implementable measures to ensure expenditure does not exceed available funds, currently standing at 40.1m for FY 23/24 and 51.6m for FY24/25. Programme funding and costs for future years will be assessed on an annual basis. Where necessary, costs will be submitted as committed liabilities for future Spending Review assessments; for example, where costs are for the maintenance or infrastructure, or where they related to headcount cost.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. The project did not provide departmental-agree monetised benefits at 22/23-Q4.The project did not provide departmental-agree monetised benefits at 22/23-Q4.The project did not provide departmental-agree monetised benefits at 22/23-Q4. N/a - no monetised benefits","themes":["Cost & funding","Approvals & decisions","Governance & assurance","Commercial & supply chain"],"evidenceExcerpt":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 is Amber. This is primarily due to the following factors. Delivery confidence is currently Amber as we have set up almost all the governance infrastructure within the Programme and we have Programme Business Case approval from Investment Committee. Our Future Delivery…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 22/23-Q4 is 2025-04-01. This is primarily due to the following factors. The Project end date is 31/3/25 and is based on the funding approved through the 2021 Spending Review, following a successful pilot funded through the 2020 Spending Review. The current programme will deliver national and some regional scale estimates of ecosystem and natural capital asset extent, location, and condition. To obtain the finer granularity that customers seek for their decisions and evaluations, additional capital funding will be required to extend the programme for 3 years. Stopping at the end of the FY 24/25 would leave additional benefits unrealised. Hence, we are working with partners and stakeholders to identify potential sources of funding for this.","narrativeClaimKind":null},{"id":"DEFRA_0190_2223-Q3","year":2024,"name":"Terrestrial Natural Capital Ecosystem Assessment","department":"DEFRA","category":"Government Transformation and Service Delivery","description":"The tNCEA programme delivers a nationwide survey of our terrestrial, freshwater and coastal environments, providing the location, extent and condition of all natural capital assets to the same timescale, the same quality and, where possible, the same spatial scale. Through comprehensive monitoring, innovative measurement and the development of tools and guidance, tNCEA will help deliver cross-government priorities, including: the 25 Year Environment Plan, Biodiversity Net Gain, Environmental Land Management schemes, Local Nature Recovery Schemes and Net Zero commitments. The programme also incorporates development of systems modelling approaches to efficiently and reliably quantify how assets and flows of natural capital inter-relate, depend on ecosystem health, and how that health is altered by pressures and interventions, and will transform decision making in England. The outputs will be used by a wide range of public and private sector organisations, including those interested in biodiversity, nature positive development, and green finance.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. This rating reflects that while the Programme has made good progress, including achieving a number of deliverables, embedding delivery and governance structures and taking steps to develop the digital infrastructure necessary to deliver datasets to customers there has been under delivery in some key areas. The Programme is actively managing all known challenges, and most are considered to be improving, and have shown no major cause for concern at this stage. Following the IPA Gate 0 review in September 2023, the programme was rated amber and we have taken positive measures to action the recommendations in their action plan and increase the likelihood of successful delivery.","startDate":"2021-04-01","endDate":"2025-04-01","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2025-04-01. This is primarily due to the following factors. The Programme end date is 31/03/2025 and is based on the SR-2021 funding settlement. The current programme will deliver national and some regional scale estimates of ecosystem and natural capital asset extent, location and condition. To obtain the finer granularity that customers seek for their decisions and evaluations, additional capital funding will be required to extend the programme for 3 years. Stopping at the end of the FY 24/25 would leave additional benefits unrealised. Hence, we are working with partners and stakeholders to prepare an SR-24 bid to enable the programme to continue for a further 3 years, and evaluate business-as-usual options post-2028.","fyBaseline":44.8,"fyForecast":36.76,"fyVariance":-18.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The HMT approved an allocation of 44.80 million. Defra's Investment Committee provided funding of 40.06 million. This reduces the budget variance to 8%. The variance was due to under delivery within the main collection projects, various unfilled vacancies and commercial delays across the year and slippage of work into 2024/25.","wholeLifeCost":125.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 remained at 125m. This is primarily due to the following factors. The programme's approved budget for 2024/25 is 56.86 million. 2024/25 work is planned on an over programmed approach equating to 3.75 million (60.61 million) above the 2024/25 budget. The programme has a range of implementable measures to control and monitor spend, and R&D programmes have a history of underspend across the Defra group. We are therefore confident expenditure will not exceed available funds.","benefits":0.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 0m. N/a - no monetised benefits","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. This rating reflects that while the Programme has made good progress, including achieving a number of deliverables, embedding delivery and governance structures and taking…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2025-04-01. This is primarily due to the following factors. The Programme end date is 31/03/2025 and is based on the SR-2021 funding settlement. The current programme will deliver national and some regional scale estimates of ecosystem and natural capital asset extent, location and condition. To obtain the finer granularity that customers seek for their decisions and evaluations, additional capital funding will be required to extend the programme for 3 years. Stopping at the end of the FY 24/25 would leave additional benefits unrealised. Hence, we are working with partners and stakeholders to prepare an SR-24 bid to enable the programme to continue for a further 3 years, and evaluate business-as-usual options post-2028.","narrativeClaimKind":null},{"id":"DEFRA_0190_2223-Q3","year":2025,"name":"TERRESTRIAL NATURAL CAPITAL ECOSYSTEM ASSESSMENT","department":"DEFRA","category":"Government Transformation and Service Delivery","description":"Defra is developing a collaborative programme to enhance national and local insight into biodiversity, ecosystems, and natural capital assets. This initiative aims to support key environmental policies, including the Environmental Improvement Plan Targets, Environmental Land Management Schemes, and Biodiversity Net Gain. By addressing gaps in existing data and integrating a more comprehensive understanding of ecosystem conditions, the programme will ensure natural capital is fully considered in future decision-making. It aligns with the government's ambitious commitments to environmental protection, both internationally through the Convention on Biodiversity and domestically via the 25 Year Environment Plan.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the SRO Quarterly Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors The assessment rating reflects ongoing delivery challenges and areas requiring focused management across the programme. The primary concern remains the publication of Analysis Ready Data (ARD) for all elements of the strategic sample over the next year, and the successful integration of this data into Defra’s policy and decision-making processes. To mitigate data risks, a coordination group has been established with partners to drive the work on ARD requirements and data availability timelines. To support delivery, the programme has established a clear scope and structure for the 2025/26 funding allocation, consolidating delivery across work-strands and partners. This clarity has enabled the definition of firm milestones, strengthened data and digital components, and reinforced benefits realisation and policy alignment for each programme element. Progress has also been made in resolving issues related to the England Ecosystem Survey. Through a structured approach involving realistic and transparent performance reporting, forecasting, risk management, and sub-contracting, the programme has stabilised delivery. Initially managed through weekly meetings, this effort is now governed via monthly operational and quarterly strategic meetings with senior leadership, delivery partners, and contractors. Lessons learned from national delivery are being applied to support the Trees Outside Woodland strand, which remains off-track. Targeted interventions are underway to bring this element back on course. To move towards a green delivery confidence rating, the programme will deliver a comprehensive plan for the publication of 2025/26 ARD datasets, including clear timelines. It will also successfully launch the NCEA Digital Search Tool to provide streamlined access to outputs. In parallel, the programme will define and respond to specific customer requirements, ensuring maximum utility of NCEA products. Continued application of robust governance and delivery practices will help maintain momentum and address off-track elements.","startDate":"2021-04-01","endDate":null,"scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 01/04/2025 to 31/03/2029. This is primarily due to the following factors‚ The original end-date reflected the period for which the programme had secured funding through the 2021 Spending Review; it has now been updated to reflect funding through the 2025 Spending Review, which will take the programme through to closure . The NCEA programme was designed around a 5-year strategic sample to measure environmental condition at a national and regional scale for England’s terrestrial and freshwater landscape. To deliver this the programme needs to run for seven years, the first year focused on setting up the environmental monitoring capability, five years to the field surveys that contribute to the strategic sample and a final year to complete the analysis and publication of the data, produce the Baseline Assessment of Natural Capital and Ecosystems and to undertake programme closure activity.","fyBaseline":56.69,"fyForecast":55.44,"fyVariance":2.2,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":null,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 125 to 331. This is primarily due to the following factors‚ The Whole Life Costs now including the costs of the last three years of the strategic sample (25/26-27/28) and the final year (28/29) needed to complete the lab analyses of the samples, quality assurance and publication of all of the data collected by the programme via Open Government Licence, and publication of the Baseline Assessment of Natural Capital and Ecoystems, that will bring together all the knowledge and information generated by the programme in an overall assessment for England. Previous Whole Life Cost figures only included the funding secured through the 2021 Spending Review where as the revised Whole Life Costs include the additional four years through to programme closure.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ NCEA programme produces long-term and wide reaching benefits which extend beyond the reach and lifetime of the programme, making accurate measurement and reporting of monetary benefits unrealistic. The programme will report on non-monetary benefits annually at minimum. The 2025/26 Programme Business Case approved by Investment Committee in March 2025, confirms the Programme does not deliver any monetised benefits.","themes":["Cost & funding","Delivery & schedule","Technical & integration","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the SRO Quarterly Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors The assessment rating reflects ongoing delivery challenges and areas requiring focused management across the programme. The primary concern remains the publication of Analysis Ready Data…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 01/04/2025 to 31/03/2029. This is primarily due to the following factors‚ The original end-date reflected the period for which the programme had secured funding through the 2021 Spending Review; it has now been updated to reflect funding through the 2025 Spending Review, which will take the programme through to closure . The NCEA programme was designed around a 5-year strategic sample to measure environmental condition at a national and regional scale for England’s terrestrial and freshwater landscape. To deliver this the programme needs to run for seven years, the first year focused on setting up the environmental monitoring capability, five years to the field surveys that contribute to the strategic sample and a final year to complete the analysis and publication of the data, produce the Baseline Assessment of Natural Capital and Ecosystems and to undertake programme closure activity.","narrativeClaimKind":null},{"id":"DEFRA_0190_2223-Q3","year":2026,"name":"TERRESTRIAL NATURAL CAPITAL ECOSYSTEM ASSESSMENT","department":"DEFRA","category":"Government Transformation and Service Delivery","description":"Defra is developing a collaborative programme to enhance national and local insight into biodiversity, ecosystems, and natural capital assets. This initiative aims to support key environmental policies, including the Environmental Improvement Plan Targets, Environmental Land Management Schemes, and Biodiversity Net Gain. By addressing gaps in existing data and integrating a more comprehensive understanding of ecosystem conditions, the programme will ensure natural capital is fully considered in future decision-making. It aligns with the government's ambitious commitments to environmental protection, both internationally through the Convention on Biodiversity and domestically via the 25 Year Environment Plan.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors‚ confidence has strengthened following the successful publication of the first Analysis Ready Datasets (ARD) in December 2025, demonstrating the programme’s ability to deliver against commitments. This further stems from Defra’s Investment Committee approving the Full Business Case, confirming spend to deliver the NCEA programme through to closure at end 2028/29.However, overall confidence is driven by two key risks: (1) availability of prepared/processed data at the required cadence, and (2) consistency of data quality and assurance across partners. This quarter the programme has been focused on embedding lessons from the first ARD batch to improve predictability. Planning for FY 2026/27 is progressing, including agreement of a quarterly batching plan to provide earliest possible access for internal and external users.","startDate":"2021-04-01","endDate":"2029-03-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same as last year's published end-date for March 2029. This is primarily due to the following factors, the NCEA programme was designed around a 5-year strategic sample to measure environmental condition at a national and regional scale for England’s terrestrial and freshwater landscape. To deliver this the programme needs to run for seven years, the first year focused on setting up the environmental monitoring capability, five years to the field surveys that contribute to the strategic sample and a final year to complete the analysis and publication of the data, produce the Baseline Assessment of Natural Capital and Ecosystems and to undertake programme closure activity.","fyBaseline":61.55,"fyForecast":60.63,"fyVariance":1.5,"varianceNarrative":"The budget variance is -1.6% meaning the programme spent 98.4% of the baseline budget. The small variance is a result of the novel and uncertain nature of Research and Development work resulting in some work across several work packages not being completed in-year as well as some work slipping into the next financial year.”","wholeLifeCost":325.68,"costNarrative":"Compared to financial year 24/25-Q4, the projects departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) decreased from £331m to £328m. The decrease to the departmentally agreed WLC is as a result of certainty around our future year budgets following spending review and business planning exercises in FY25/26. The Programmes final business case covering spend from FY26/27 to FY28/29 was approved by Defra Investment Committee in March 2026 which covers the final two years of our fieldwork and the programmes final year. FY28/29 is needed to complete the lab analyses of the samples, quality assurance and publication of all of the data collected by the programme via Open Government Licence, and publication of the Baseline Assessment of Natural Capital and Ecoystems, that will bring together all the knowledge and information generated by the programme in an overall assessment for England.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 remained at 0. This is primarily due to the following factors‚ NCEA programme produces long-term and wide reaching benefits which extend beyond the reach and lifetime of the programme, making accurate measurement and reporting of monetary benefits unrealistic. The programme will report on non-monetary benefits annually at minimum. The Full Programme Business Case approved by Investment Committee in March 2026, confirms the Programme does not deliver any monetised benefits.","themes":["Cost & funding","Governance & assurance","Technical & integration","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Amber. This is primarily due to the following factors‚ confidence has strengthened following the successful publication of the first Analysis Ready Datasets (ARD) in December 2025, demonstrating the programme’s ability to deliver against…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same as last year's published end-date for March 2029. This is primarily due to the following factors, the NCEA programme was designed around a 5-year strategic sample to measure environmental condition at a national and regional scale for England’s terrestrial and freshwater landscape. To deliver this the programme needs to run for seven years, the first year focused on setting up the environmental monitoring capability, five years to the field surveys that contribute to the strategic sample and a final year to complete the analysis and publication of the data, produce the Baseline Assessment of Natural Capital and Ecosystems and to undertake programme closure activity.","narrativeClaimKind":null}],"previous":{"id":"DEFRA_0190_2223-Q3","year":2025,"name":"TERRESTRIAL NATURAL CAPITAL ECOSYSTEM ASSESSMENT","department":"DEFRA","category":"Government Transformation and Service Delivery","description":"Defra is developing a collaborative programme to enhance national and local insight into biodiversity, ecosystems, and natural capital assets. This initiative aims to support key environmental policies, including the Environmental Improvement Plan Targets, Environmental Land Management Schemes, and Biodiversity Net Gain. By addressing gaps in existing data and integrating a more comprehensive understanding of ecosystem conditions, the programme will ensure natural capital is fully considered in future decision-making. It aligns with the government's ambitious commitments to environmental protection, both internationally through the Convention on Biodiversity and domestically via the 25 Year Environment Plan.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the SRO Quarterly Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors The assessment rating reflects ongoing delivery challenges and areas requiring focused management across the programme. The primary concern remains the publication of Analysis Ready Data (ARD) for all elements of the strategic sample over the next year, and the successful integration of this data into Defra’s policy and decision-making processes. To mitigate data risks, a coordination group has been established with partners to drive the work on ARD requirements and data availability timelines. To support delivery, the programme has established a clear scope and structure for the 2025/26 funding allocation, consolidating delivery across work-strands and partners. This clarity has enabled the definition of firm milestones, strengthened data and digital components, and reinforced benefits realisation and policy alignment for each programme element. Progress has also been made in resolving issues related to the England Ecosystem Survey. Through a structured approach involving realistic and transparent performance reporting, forecasting, risk management, and sub-contracting, the programme has stabilised delivery. Initially managed through weekly meetings, this effort is now governed via monthly operational and quarterly strategic meetings with senior leadership, delivery partners, and contractors. Lessons learned from national delivery are being applied to support the Trees Outside Woodland strand, which remains off-track. Targeted interventions are underway to bring this element back on course. To move towards a green delivery confidence rating, the programme will deliver a comprehensive plan for the publication of 2025/26 ARD datasets, including clear timelines. It will also successfully launch the NCEA Digital Search Tool to provide streamlined access to outputs. In parallel, the programme will define and respond to specific customer requirements, ensuring maximum utility of NCEA products. Continued application of robust governance and delivery practices will help maintain momentum and address off-track elements.","startDate":"2021-04-01","endDate":null,"scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 01/04/2025 to 31/03/2029. This is primarily due to the following factors‚ The original end-date reflected the period for which the programme had secured funding through the 2021 Spending Review; it has now been updated to reflect funding through the 2025 Spending Review, which will take the programme through to closure . The NCEA programme was designed around a 5-year strategic sample to measure environmental condition at a national and regional scale for England’s terrestrial and freshwater landscape. To deliver this the programme needs to run for seven years, the first year focused on setting up the environmental monitoring capability, five years to the field surveys that contribute to the strategic sample and a final year to complete the analysis and publication of the data, produce the Baseline Assessment of Natural Capital and Ecosystems and to undertake programme closure activity.","fyBaseline":56.69,"fyForecast":55.44,"fyVariance":2.2,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":null,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 125 to 331. This is primarily due to the following factors‚ The Whole Life Costs now including the costs of the last three years of the strategic sample (25/26-27/28) and the final year (28/29) needed to complete the lab analyses of the samples, quality assurance and publication of all of the data collected by the programme via Open Government Licence, and publication of the Baseline Assessment of Natural Capital and Ecoystems, that will bring together all the knowledge and information generated by the programme in an overall assessment for England. Previous Whole Life Cost figures only included the funding secured through the 2021 Spending Review where as the revised Whole Life Costs include the additional four years through to programme closure.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ NCEA programme produces long-term and wide reaching benefits which extend beyond the reach and lifetime of the programme, making accurate measurement and reporting of monetary benefits unrealistic. The programme will report on non-monetary benefits annually at minimum. The 2025/26 Programme Business Case approved by Investment Committee in March 2025, confirms the Programme does not deliver any monetised benefits.","themes":["Cost & funding","Delivery & schedule","Technical & integration","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the SRO Quarterly Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors The assessment rating reflects ongoing delivery challenges and areas requiring focused management across the programme. The primary concern remains the publication of Analysis Ready Data…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 01/04/2025 to 31/03/2029. This is primarily due to the following factors‚ The original end-date reflected the period for which the programme had secured funding through the 2021 Spending Review; it has now been updated to reflect funding through the 2025 Spending Review, which will take the programme through to closure . The NCEA programme was designed around a 5-year strategic sample to measure environmental condition at a national and regional scale for England’s terrestrial and freshwater landscape. To deliver this the programme needs to run for seven years, the first year focused on setting up the environmental monitoring capability, five years to the field surveys that contribute to the strategic sample and a final year to complete the analysis and publication of the data, produce the Baseline Assessment of Natural Capital and Ecosystems and to undertake programme closure activity.","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":null,"attentionScore":18,"attentionReasons":["Current published delivery confidence is Amber"]},{"id":"DFT_0037_1920-Q3","year":2026,"name":"TRANSPENNINE ROUTE UPGRADE","department":"DFT","category":"Infrastructure and Construction","description":"The Transpennine Route Upgrade (TRU) is a large-scale upgrade of the railway between Manchester, Leeds and York and will provide more capacity, and faster, more reliable, greener journeys. We are investing £11bn in TRU, £7.3bn of which has already been committed. This is the largest rail investment in the north of England and the second biggest nationally after HS2. TRU is well underway and delivering successfully to time and budget. A rolling programme of upgrades will deliver benefits incrementally over the next decade with some being delivered now. It will support passengers by electrifying the 70-mile route, addressing pinch points, remodelling stations, adopting digital signalling and introducing new trains. This will facilitate the introduction of a new, enhanced timetable for passengers, delivering more reliable and quicker journeys between key cities. TRU is developing options to benefit freight by facilitating up to 15 freight paths (using the largest wagons available) in each direction per day across the north of England, the equivalent to removing 1,140 lorry movements a day. Such a modal shift from road freight to rail would ease congestion and reduce pollution.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 25/26-Q4 remained at AMBER. This is primarily due to continued strong programme performance and integration of programmes across the north of England. To date, £7.3bn has been committed to the upgrade, with the Prime Minister announcing in March 2025 an additional £415m to maintain programme delivery and support passengers to travel by rail whilst major works are taking place along the TRU route. Infrastructure delivery continues to be delivered to time and budget with electrification works on the line between York and Church Fenton completed in August 2025 enabling electric operations on 25% of the Transpennine route. Major works were commenced at Huddersfield station in September 2025 with new bridges and longer platforms delivered as well as a new train stabling facility at Hillhouse. Benefits delivery remains on schedule with the bulk of improvements being delivered by the end of the 2020s (when the line of route between Huddersfield and York will be fully upgraded) and the remainder by the mid-2030s (when digital signalling and the section of the route between Huddersfield and Stalybridge will complete). 95% of the programme is now in either the Design or Delivery phase with several significant blockades taking place in 2026 to renew track and install overhead electrification. Comprehensive customer handling plans are in place and routine assurance by DfT teams is carried out to test their suitability; to date disruption across the route continues to be handled well with high passenger satisfaction scores. TransPennine Trains' existing diesel-only fleet will also be replaced to maximise the new electrification capability. A procurement has been undertaken and a contract award is expected in summer 2026. A Cost Efficiency panel, chaired by DfT's Non-Executive Director to the programme, continues to oversee activities to deliver the identified cost efficiency targets. In February 2026 a new Shareholder Forum was established to enable the Accounting Officers within the Department for Transport and Network Rail to consider programme delivery and future challenges to benefits realisation.","startDate":"2017-07-01","endDate":"2041-10-17","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained at 17/10/2041 and was informed by a baselining exercise that aligned all Key Output realisation dates with Programme Business Case 2 (PBC2) commitments. The bulk of TRU's benefits will be delivered by the mid-2030s, with additional digital signalling capability becoming available by the early 2040s. The programme has a stable integrated schedule based on Baseline 2.1 agreed by Enterprise partners which maintains Key Output dates for KO1 to KO5b as agreed at PBC2, as well as the PBC2 funding position for all infrastructure sub-projects. Baseline 2.1 created a stable programme baseline position with a realistic and achievable critical path now committed to with both delivery Alliances as part of the W34 and E234 contract awards. It also forecasts P50 and P80 delivery dates and timelines for benefits delivery. The approval of the TOC-Business Case in March 2025, confirmed alignment of train-operator related delivery plans with Baseline 2.1. KO2 (electrification of services between Manchester Victoria and Stalybridge) was completed ahead of schedule at the end of 2024, and KO3 (electrification of TransPennine Services between York and Church Fenton)was delivered on time in summer 2025.","fyBaseline":1007.93,"fyForecast":1006.12,"fyVariance":0.18,"varianceNarrative":"The budget variance is less than or equal to 5%","wholeLifeCost":10658.6,"costNarrative":"The departmentally agreed Whole Life Cost at FY2025/26 Q4 increased from £11,056m to £11,199m. This is stated in nominal terms. This is primarily due to re-alignment of portfolio budgets with the current forecast as the previous budget position was not sufficient. The current forecast has changed marginally from £11,204m to £11,210m.","benefits":1754.86,"benefitsNarrative":"The departmentally agreed Benefits at FY2025/26 Q4 remains at £2,978m. This is stated in Present Value 2010 terms. The estimate continues to reflect the baseline set at Programme Business Case 2 (May 2023). This estimate is expected to be revised over the period to the next Annual Report, assuming the current draft Programme Business Case 3 is approved. This is not a significant update, and the scope and outputs of the programme remain stable.","themes":["Delivery & schedule","Cost & funding","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 25/26-Q4 remained at AMBER. This is primarily due to continued strong programme performance and integration of programmes across the north of England. To date, £7.3bn has been committed to the upgrade, with the Prime Minister announcing in…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained at 17/10/2041 and was informed by a baselining exercise that aligned all Key Output realisation dates with Programme Business Case 2 (PBC2) commitments. The bulk of TRU's benefits will be delivered by the mid-2030s, with additional digital signalling capability becoming available by the early 2040s. The programme has a stable integrated schedule based on Baseline 2.1 agreed by Enterprise partners which maintains Key Output dates for KO1 to KO5b as agreed at PBC2, as well as the PBC2 funding position for all infrastructure sub-projects. Baseline 2.1 created a stable programme baseline position with a realistic and achievable critical path now committed to with both delivery Alliances as part of the W34 and E234 contract awards. It also forecasts P50 and P80 delivery dates and timelines for benefits delivery. The approval of the TOC-Business Case in March 2025, confirmed alignment of train-operator related delivery plans with Baseline 2.1. KO2 (electrification of services between Manchester Victoria and Stalybridge) was completed ahead of schedule at the end of 2024, and KO3 (electrification of TransPennine Services between York and Church Fenton)was delivered on time in summer 2025.","narrativeClaimKind":null,"history":[{"id":"DFT_0037_1920-Q3","year":2021,"name":"Transpennine Route Upgrade","department":"DFT","category":"Infrastructure and Construction","description":"The TRU programme will deliver journey time improvements, additional services, increased passenger capacity, enhanced performance and reliability and improved environmental performance to the main rail link across the Pennines between Manchester and York via Huddersfield and Leeds.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber.This is primarily due to the following factors: The IPA Gateway 2 review was held in January 2021 and concluded an Amber rating, this indicates the programme is in a good place with no major obstacles to progress. Recommendations from the Gateway 2 review have been accepted and responses are being developed and implemented, alongside those received from other external assurance activities. The single biggest issue on the programme is the lack of an agreed end-state and evolving priorities and requirements. This needs to be resolved through a Programme Business Case alongside the Integrated Rail Plan for the North, which will enable leadership to stabilise the programme, and focus management attention onto efficient and effective delivery.","startDate":"2017-07-01","endDate":"2028-07-31","scheduleNarrative":"The project end-date is 31 July 2028. This is primarily due to the following factors: The Transpennine Route Upgrade is currently on track to deliver against its baseline schedule. At the next investment decision the project scope will be confirmed. If options for increased scope, enabling greater benefits, are selected the programme end date will extend to accommodate this.","fyBaseline":253.0,"fyForecast":239.0,"fyVariance":-6.0,"varianceNarrative":"The budget variance exceeds 5%. In-year spend forecast total is �14m less than baseline total (-6% variance) due to achieved efficiencies and delay in delivery of some scope.","wholeLifeCost":3506.0,"costNarrative":"The projects Baseline Whole Life Cost is �3506.00m. This is primarily due to the following factors: TRU has secured design funding through Outline Business Case (April 2020) for a scheme known as Option C (costs reported above). Additional funding was secured for development of two further options with increased scope. The choice between these, and the associated whole life project cost, will be informed by the outcome of the Integrated Rail Plan for the North and confirmed through a Programme Business Case this summer. NB: Programme GMPP baseline is �3.5-3.9bn for Option C in line with April 2020 Outline Business Case.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Scope & requirements"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber.This is primarily due to the following factors: The IPA Gateway 2 review was held in January 2021 and concluded an Amber rating, this indicates the programme is in a good place with no major obstacles to progress. Recommendations from the Gateway 2 review have been…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project end-date is 31 July 2028. This is primarily due to the following factors: The Transpennine Route Upgrade is currently on track to deliver against its baseline schedule. At the next investment decision the project scope will be confirmed. If options for increased scope, enabling greater benefits, are selected the programme end date will extend to accommodate this.","narrativeClaimKind":null},{"id":"DFT_0037_1920-Q3","year":2022,"name":"Transpennine Route Upgrade","department":"DFT","category":"Infrastructure and Construction","description":"The TransPennine Route Upgrade (TRU) is a full \"route modernisation\" programme for the North TransPennine Route, the key East-West rail link across the North of England from Manchester to York, via Huddersfield and Leeds. It is expected to halve average delay minutes for fast services, provide an extra two train paths per hour, aim to reduce journey times from 55 to 41 minutes (reducing further to 33 minutes with NPR work about a decade later) from York to Manchester, and electrify the whole route for decarbonisation objectives and operational cost savings. The proposed scope for the programme includes early delivery of Northern Powerhouse Rail (NPR) infrastructure.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 remained at Amber. This is primarily due to the timing of publication of the proposals in the Integrated Rail Plan (IRP) which remained uncertain and were fundamental to confirm the final end state described in Option G (for programme elements transferred to Transpennine Route Upgrade from Northern Powerhouse Rail (NPR)). The IRP and Spending Review (SR) has now been resolved and the next Infrastructure and Projects Authority review will be late 2022.","startDate":"2017-07-01","endDate":"2041-10-17","scheduleNarrative":"Compared to 2021-Q4, your project end-date increased from 31 JUL 2028 to 17 OCT 2041 . This is primarily due to the following factors: The end-state delivery date was moved from 2028 to 2033 (P80 dates) due to the increase in the 'core' scope. At the time of the Programme Business Case in June 2021, the NPR enabling scope was added to the end of the programme, and this extended the completion date to 2041. The current assumption aligns the Project End Date with completion of GRIP 8 for all projects. However, Network Rail are working on better integration of NPR enabling scope with the 'core' scope and this should lead to an earlier delivery date. The revised delivery date will be included in the next Business Case iteration, in early 2023.","fyBaseline":450.0,"fyForecast":412.0,"fyVariance":-8.0,"varianceNarrative":"This is primarily due to an increase in design phase duration for Project W3, a delay in the commencement of NPR enabling works and legal issues in the digital programme.","wholeLifeCost":9185.0,"costNarrative":"Compared to2021-Q4, the projects Baseline Whole Life Cost increased from 3506.00 (£m) to 9185.00 (£m). This is primarily due to the following factors: The increase in scope which now includes digital signalling and full electrification. The £3.506bn figure was based on a previous option and included discontinuous electrification. The scope of the 'core' TRU package increased to £5.960bn in 2021, and this included full route electrification and partial digital signalling. Furthermore, in 2021, the scope was increased further to include the early facilitation of Northern Powerhouse Rail and enhanced freight capability. The cost range for Option F1 'core' TRU has remained stable, but the cost range for the wider NPR compatible Option G has increased in cost, reflecting the higher level of uncertainty. TRU's cost range for infrastructure is in the range £8,416m at P50 to £9,185m at P80.","benefits":null,"benefitsNarrative":"","themes":["Scope & requirements","Cost & funding","Delivery & schedule","Technical & integration"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 remained at Amber. This is primarily due to the timing of publication of the proposals in the Integrated Rail Plan (IRP) which remained uncertain and were fundamental to confirm the final end state described in Option G (for…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to 2021-Q4, your project end-date increased from 31 JUL 2028 to 17 OCT 2041 . This is primarily due to the following factors: The end-state delivery date was moved from 2028 to 2033 (P80 dates) due to the increase in the 'core' scope. At the time of the Programme Business Case in June 2021, the NPR enabling scope was added to the end of the programme, and this extended the completion date to 2041. The current assumption aligns the Project End Date with completion of GRIP 8 for all projects. However, Network Rail are working on better integration of NPR enabling scope with the 'core' scope and this should lead to an earlier delivery date. The revised delivery date will be included in the next Business Case iteration, in early 2023.","narrativeClaimKind":null},{"id":"DFT_0037_1920-Q3","year":2023,"name":"Transpennine Route Upgrade","department":"DFT","category":"Infrastructure and Construction","description":"TRU is a major multi-billion-pound programme of railway improvements between Manchester, Huddersfield, Leeds and York. TRU will bring passengers more frequent, faster, greener trains, running on a better, cleaner, and more reliable railway. TRU will transform East-West travel across the North of England.It will include full electrification of the route, additional tracks, new digital signalling, and more capability to allow greater freight use. It is a key commitment in the governments 96bn integrated rail plan, published last year, which confirmed support for the TRU Programme.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. This is primarily due to the timing of publication of the proposals in the Integrated Rail Plan (IRP) which remained uncertain and were fundamental to confirm the final end state described in Option G (for programme elements transferred to Transpennine Route Upgrade from Northern Powerhouse Rail (NPR)). The IRP and Spending Review (SR) has now been resolved and the next Infrastructure and Projects Authority review will be April 2023.","startDate":"2017-07-01","endDate":"2041-10-17","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2041-10-17. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2041-10-17. This is primarily due to the following factors. A rebaselined schedule will be provided as part of the PBC2 submission in Spring 2023.","fyBaseline":661.5,"fyForecast":590.0,"fyVariance":-11.0,"varianceNarrative":"The budget 612m budget set at SR21, since then the scope has matured significantly, and Northern Powerhouse Rail facilitation projects have been integrated. At the same time, significant efficiencies have been generated which have outpaced inflationary pressures to reduce overall project totals. The consequent resequencing and reforecasting of the project prior to its next major approval in 2023 has resulted in the variance shown.","wholeLifeCost":11453.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 increased from 9185m. to 11453m. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 increased from 9185m. to 11453m. This is primarily due to the following factors. There has been no cost increase in the programme: the variance relates to the way TRU has been recorded in the GMPP return. The 9,185m forecast excluded two significant cost groups. At PBC1, the forecast included 1,667m of risk provision based on Reference Class Forecasting which was not profiled and so not included in the 9,185m; and 602m of Operator Costs which were also not profiled in Q4 of 2021/22. We will be receiving an updated assured estimate from Network Rail and Train Operator delivery partners in the next few weeks and this should lead to an updated forecast at Q1 2023/24. The whole life costs are nominal inflated values (AFC), as presented in PBC1","benefits":3088.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 3088m. Benefits of the programme are wider public and economic benefits from faster and more reliable journeys, more journey opportunities and an improved environment from a shift of passenger and freight transport to rail, plus decarbonisation, including from electrification. The benefits are 2010 Present Values as presented in PBC1.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. This is primarily due to the timing of publication of the proposals in the Integrated Rail Plan (IRP) which remained uncertain and were fundamental to confirm the…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2041-10-17. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2041-10-17. This is primarily due to the following factors. A rebaselined schedule will be provided as part of the PBC2 submission in Spring 2023.","narrativeClaimKind":null},{"id":"DFT_0037_1920-Q3","year":2024,"name":"Transpennine Route Upgrade","department":"DFT","category":"Infrastructure and Construction","description":"TRU is a major multi-billion-pound programme of railway improvements between Manchester, Huddersfield, Leeds and York. TRU will bring passengers more frequent, faster, greener trains, running on a better, cleaner, and more reliable railway. TRU will transform East-West travel across the North of England.It will include full electrification of the route, additional tracks, new digital signalling, and more capability to allow greater freight use. To date, 6.9bn has been committed to the programme, against an Anticipated Final Cost of 10.4bn - 11.6bn.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The complexity of the regional timetable has the potential to place pressure on benefits. Timetable modelling due to conclude later this year expected to alleviate this. TRU is also dependent on adjacent projects in Manchester and Leeds to deliver its full benefits, but doesn't control their approvals and funding. Governance has been implemented to ensure regional integration.","startDate":"2017-07-01","endDate":"2041-10-17","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2041-10-17. This is primarily due to the following factors. TRU's Programme Business Case 2 (PBC2) funding approval was announced in December 2023. PBC2 has led to some replanning but with Entry into Service dates remaining as per the baseline (which will see full passenger benefit realisation by the mid 2030s). Negotiations between Network Rail and the supply chain to formally place into contract two of the largest sub-projects in the programme (W34 - Huddersfield to Leeds, and E234 - Church Fenton to Leeds) are on track to conclude by Summer 2024.","fyBaseline":647.56,"fyForecast":698.07,"fyVariance":8.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. Network Rail took the initiative to bring forward infrastructure spend previously forecast in future years to deliver it early. This is considered efficient, as it releases it from the forecast and therefore will not be subject to risk and inflation within the programme. A programme change control was approved by the Rail Network Enhancements Pipeline (RNEP) Portfolio Board.","wholeLifeCost":11104.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 decreased from 11453m. to 11104m. This is primarily due to the following factors. The previous 11.453bn figure was stated at TRU Programme Business Case Update 1 (May 2021). Since then, we have received approval for TRU Programme Business Case Update 2 (May 2023) - 11.183bn. In the intervening two years, the programme has experienced headwinds in project costs and has been re-stated using March 2023 OBR inflation forecasts, but offset by efficiencies totalling 1.6bn. The 11.103bn figure was set following at DfT Rail Network Enhancements Pipeline (RNEP) Portfolio Re-baselining exercise in the summer of 2023.","benefits":2978.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 2324-Q4 decreased from 3088m. to 2978m. Benefits of the programme are wider public and economic benefits from faster and more reliable journeys, more journey opportunities and an improved environment from a shift of passenger and freight transport to rail, plus decarbonisation, including from electrification.","themes":["Cost & funding","Approvals & decisions","Commercial & supply chain","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The complexity of the regional timetable has the potential to place pressure on benefits. Timetable modelling due to conclude later this year expected to alleviate…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2041-10-17. This is primarily due to the following factors. TRU's Programme Business Case 2 (PBC2) funding approval was announced in December 2023. PBC2 has led to some replanning but with Entry into Service dates remaining as per the baseline (which will see full passenger benefit realisation by the mid 2030s). Negotiations between Network Rail and the supply chain to formally place into contract two of the largest sub-projects in the programme (W34 - Huddersfield to Leeds, and E234 - Church Fenton to Leeds) are on track to conclude by Summer 2024.","narrativeClaimKind":null},{"id":"DFT_0037_1920-Q3","year":2025,"name":"TRANSPENNINE ROUTE UPGRADE","department":"DfT","category":"Infrastructure and Construction","description":"The Transpennine route upgrade (TRU) is a large-scale upgrade of the railway between Manchester, Leeds and York and will provide more capacity, and faster, more reliable, greener journeys. We are investing £11bn in TRU, £7.3bn of which has already been committed. This is the largest investment in the north of England and the second biggest nationally after HS2. TRU is well underway and delivering successfully to time and budget. A rolling programme of upgrades will deliver benefits incrementally over the next decade with some being delivered now. It will support passengers by electrifying the 70-mile route, addressing pinch points, remodelling stations, adopting digital signalling and introducing new trains. This will facilitate the introduction of a new, enhanced timetable for passengers, delivering more reliable and quicker journeys between key cities. TRU is developing options to benefit freight by facilitating up to 15 freight paths (using the largest wagons available) in each direction per day across the north of England, the equivalent to removing 1,140 lorry movements a day. If approved, this will ease congestion and reduce pollution.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to continued strong programme performance, integration of programmes across the north of England, and senior management turnover. To date, £7.3bn has been committed to the upgrade, with the Prime Minister announcing in March 2025 an additional £415m to maintain programme delivery and support passengers to travel by rail whilst major works are taking place along the TRU route. Infrastructure delivery continues to be delivered to time and budget with works completing at the end of 2024 between Manchester Victoria and Stalybridge, facilitating electric Northern and TransPennine services for the first time. Works to upgrade and electrify the line between York and Church Fenton have recently concluded and await ORR authorisation. This will enable electric TransPennine services to operate along this section of the route later in 2025. Benefits delivery remains on schedule with the bulk of improvements being delivered by the end of the 2020s (where the line of route between Huddersfield and York will be fully upgraded) and the remainder by the mid-2030s (where digital signalling and the section of the route between Huddersfield and Stalybridge will complete). 95% of the programme is now in either the Design or Delivery phase with several significant blockades taking place in 2025, most notably a 30-day closure of the railway at Huddersfield in August. Comprehensive customer handling plans are in place and routine assurance by DfT teams is carried out to test their suitability; to date disruption across the route continues to be handled well with high passenger satisfaction scores. TransPennine Trains' existing diesel-only fleet will also be replaced to maximise the new electrification capability. Whilst detailed discussions are taking place regarding their specification, procurement is progressing with a contract award expected in summer 2025. A Cost Efficiency panel, chaired by DfT's Non-Executive Director to the programme, has also been established to monitor progress towards securing additional efficiencies. In February 2025, a new Managing Director commenced in role, as well as a new permanent SRO, bringing stability to the programme's leadership.","startDate":"2017-07-01","endDate":"2041-10-17","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 17/10/2041. This is primarily due to a recent, successful re-baselining exercise that sees all Key Output realisation dates aligned with Programme Business Case 2 (PBC2) commitments. The bulk of TRU's benefits will be delivered by the mid-2030s, with additional digital signalling capability becoming available by the early 2040s. The programme has a stable integrated schedule that was recently updated. Baseline 2.1 was agreed last year between Enterprise partners and maintains Key Output dates for KO1 to KO5b as agreed at PBC2, as well as the PBC2 funding position for all infrastructure sub-projects. Baseline 2.1 creates a stable programme baseline position with a realistic and achievable critical path now committed to with both delivery Alliances as part of the W34 and E234 contract awards. It also forecasts P50 and P80 delivery dates and timelines for benefits delivery. The approval of the TOC-Business Case in March 2025, confirmed alignment of train-operator related delivery plans with Baseline 2.1. KO2 (electrification of services between Manchester Victoria and Stalybridge) was completed ahead of schedule at the end of 2024, and KO3 (electrification of TransPennine Services between York and Church Fenton) is on track to be delivered by summer 2025.","fyBaseline":848.82,"fyForecast":843.99,"fyVariance":0.57,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":11056.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 11104 to 11056. This is primarily due to the following factors‚ Adjustment to reflect change in budget post Spending Review Phase 1.","benefits":2978.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 2978. This is primarily due to the following factors‚ This is because we have not restated the benefits baseline since Programme Business Case 2 (May 2023).","themes":["Delivery & schedule","Cost & funding","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to continued strong programme performance, integration of programmes across the north of England, and senior management turnover. To date, £7.3bn has been committed to the upgrade, with the…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 17/10/2041. This is primarily due to a recent, successful re-baselining exercise that sees all Key Output realisation dates aligned with Programme Business Case 2 (PBC2) commitments. The bulk of TRU's benefits will be delivered by the mid-2030s, with additional digital signalling capability becoming available by the early 2040s. The programme has a stable integrated schedule that was recently updated. Baseline 2.1 was agreed last year between Enterprise partners and maintains Key Output dates for KO1 to KO5b as agreed at PBC2, as well as the PBC2 funding position for all infrastructure sub-projects. Baseline 2.1 creates a stable programme baseline position with a realistic and achievable critical path now committed to with both delivery Alliances as part of the W34 and E234 contract awards. It also forecasts P50 and P80 delivery dates and timelines for benefits delivery. The approval of the TOC-Business Case in March 2025, confirmed alignment of train-operator related delivery plans with Baseline 2.1. KO2 (electrification of services between Manchester Victoria and Stalybridge) was completed ahead of schedule at the end of 2024, and KO3 (electrification of TransPennine Services between York and Church Fenton) is on track to be delivered by summer 2025.","narrativeClaimKind":null},{"id":"DFT_0037_1920-Q3","year":2026,"name":"TRANSPENNINE ROUTE UPGRADE","department":"DFT","category":"Infrastructure and Construction","description":"The Transpennine Route Upgrade (TRU) is a large-scale upgrade of the railway between Manchester, Leeds and York and will provide more capacity, and faster, more reliable, greener journeys. We are investing £11bn in TRU, £7.3bn of which has already been committed. This is the largest rail investment in the north of England and the second biggest nationally after HS2. TRU is well underway and delivering successfully to time and budget. A rolling programme of upgrades will deliver benefits incrementally over the next decade with some being delivered now. It will support passengers by electrifying the 70-mile route, addressing pinch points, remodelling stations, adopting digital signalling and introducing new trains. This will facilitate the introduction of a new, enhanced timetable for passengers, delivering more reliable and quicker journeys between key cities. TRU is developing options to benefit freight by facilitating up to 15 freight paths (using the largest wagons available) in each direction per day across the north of England, the equivalent to removing 1,140 lorry movements a day. Such a modal shift from road freight to rail would ease congestion and reduce pollution.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 25/26-Q4 remained at AMBER. This is primarily due to continued strong programme performance and integration of programmes across the north of England. To date, £7.3bn has been committed to the upgrade, with the Prime Minister announcing in March 2025 an additional £415m to maintain programme delivery and support passengers to travel by rail whilst major works are taking place along the TRU route. Infrastructure delivery continues to be delivered to time and budget with electrification works on the line between York and Church Fenton completed in August 2025 enabling electric operations on 25% of the Transpennine route. Major works were commenced at Huddersfield station in September 2025 with new bridges and longer platforms delivered as well as a new train stabling facility at Hillhouse. Benefits delivery remains on schedule with the bulk of improvements being delivered by the end of the 2020s (when the line of route between Huddersfield and York will be fully upgraded) and the remainder by the mid-2030s (when digital signalling and the section of the route between Huddersfield and Stalybridge will complete). 95% of the programme is now in either the Design or Delivery phase with several significant blockades taking place in 2026 to renew track and install overhead electrification. Comprehensive customer handling plans are in place and routine assurance by DfT teams is carried out to test their suitability; to date disruption across the route continues to be handled well with high passenger satisfaction scores. TransPennine Trains' existing diesel-only fleet will also be replaced to maximise the new electrification capability. A procurement has been undertaken and a contract award is expected in summer 2026. A Cost Efficiency panel, chaired by DfT's Non-Executive Director to the programme, continues to oversee activities to deliver the identified cost efficiency targets. In February 2026 a new Shareholder Forum was established to enable the Accounting Officers within the Department for Transport and Network Rail to consider programme delivery and future challenges to benefits realisation.","startDate":"2017-07-01","endDate":"2041-10-17","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained at 17/10/2041 and was informed by a baselining exercise that aligned all Key Output realisation dates with Programme Business Case 2 (PBC2) commitments. The bulk of TRU's benefits will be delivered by the mid-2030s, with additional digital signalling capability becoming available by the early 2040s. The programme has a stable integrated schedule based on Baseline 2.1 agreed by Enterprise partners which maintains Key Output dates for KO1 to KO5b as agreed at PBC2, as well as the PBC2 funding position for all infrastructure sub-projects. Baseline 2.1 created a stable programme baseline position with a realistic and achievable critical path now committed to with both delivery Alliances as part of the W34 and E234 contract awards. It also forecasts P50 and P80 delivery dates and timelines for benefits delivery. The approval of the TOC-Business Case in March 2025, confirmed alignment of train-operator related delivery plans with Baseline 2.1. KO2 (electrification of services between Manchester Victoria and Stalybridge) was completed ahead of schedule at the end of 2024, and KO3 (electrification of TransPennine Services between York and Church Fenton)was delivered on time in summer 2025.","fyBaseline":1007.93,"fyForecast":1006.12,"fyVariance":0.18,"varianceNarrative":"The budget variance is less than or equal to 5%","wholeLifeCost":10658.6,"costNarrative":"The departmentally agreed Whole Life Cost at FY2025/26 Q4 increased from £11,056m to £11,199m. This is stated in nominal terms. This is primarily due to re-alignment of portfolio budgets with the current forecast as the previous budget position was not sufficient. The current forecast has changed marginally from £11,204m to £11,210m.","benefits":1754.86,"benefitsNarrative":"The departmentally agreed Benefits at FY2025/26 Q4 remains at £2,978m. This is stated in Present Value 2010 terms. The estimate continues to reflect the baseline set at Programme Business Case 2 (May 2023). This estimate is expected to be revised over the period to the next Annual Report, assuming the current draft Programme Business Case 3 is approved. This is not a significant update, and the scope and outputs of the programme remain stable.","themes":["Delivery & schedule","Cost & funding","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 25/26-Q4 remained at AMBER. This is primarily due to continued strong programme performance and integration of programmes across the north of England. To date, £7.3bn has been committed to the upgrade, with the Prime Minister announcing in…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained at 17/10/2041 and was informed by a baselining exercise that aligned all Key Output realisation dates with Programme Business Case 2 (PBC2) commitments. The bulk of TRU's benefits will be delivered by the mid-2030s, with additional digital signalling capability becoming available by the early 2040s. The programme has a stable integrated schedule based on Baseline 2.1 agreed by Enterprise partners which maintains Key Output dates for KO1 to KO5b as agreed at PBC2, as well as the PBC2 funding position for all infrastructure sub-projects. Baseline 2.1 created a stable programme baseline position with a realistic and achievable critical path now committed to with both delivery Alliances as part of the W34 and E234 contract awards. It also forecasts P50 and P80 delivery dates and timelines for benefits delivery. The approval of the TOC-Business Case in March 2025, confirmed alignment of train-operator related delivery plans with Baseline 2.1. KO2 (electrification of services between Manchester Victoria and Stalybridge) was completed ahead of schedule at the end of 2024, and KO3 (electrification of TransPennine Services between York and Church Fenton)was delivered on time in summer 2025.","narrativeClaimKind":null}],"previous":{"id":"DFT_0037_1920-Q3","year":2025,"name":"TRANSPENNINE ROUTE UPGRADE","department":"DfT","category":"Infrastructure and Construction","description":"The Transpennine route upgrade (TRU) is a large-scale upgrade of the railway between Manchester, Leeds and York and will provide more capacity, and faster, more reliable, greener journeys. We are investing £11bn in TRU, £7.3bn of which has already been committed. This is the largest investment in the north of England and the second biggest nationally after HS2. TRU is well underway and delivering successfully to time and budget. A rolling programme of upgrades will deliver benefits incrementally over the next decade with some being delivered now. It will support passengers by electrifying the 70-mile route, addressing pinch points, remodelling stations, adopting digital signalling and introducing new trains. This will facilitate the introduction of a new, enhanced timetable for passengers, delivering more reliable and quicker journeys between key cities. TRU is developing options to benefit freight by facilitating up to 15 freight paths (using the largest wagons available) in each direction per day across the north of England, the equivalent to removing 1,140 lorry movements a day. If approved, this will ease congestion and reduce pollution.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to continued strong programme performance, integration of programmes across the north of England, and senior management turnover. To date, £7.3bn has been committed to the upgrade, with the Prime Minister announcing in March 2025 an additional £415m to maintain programme delivery and support passengers to travel by rail whilst major works are taking place along the TRU route. Infrastructure delivery continues to be delivered to time and budget with works completing at the end of 2024 between Manchester Victoria and Stalybridge, facilitating electric Northern and TransPennine services for the first time. Works to upgrade and electrify the line between York and Church Fenton have recently concluded and await ORR authorisation. This will enable electric TransPennine services to operate along this section of the route later in 2025. Benefits delivery remains on schedule with the bulk of improvements being delivered by the end of the 2020s (where the line of route between Huddersfield and York will be fully upgraded) and the remainder by the mid-2030s (where digital signalling and the section of the route between Huddersfield and Stalybridge will complete). 95% of the programme is now in either the Design or Delivery phase with several significant blockades taking place in 2025, most notably a 30-day closure of the railway at Huddersfield in August. Comprehensive customer handling plans are in place and routine assurance by DfT teams is carried out to test their suitability; to date disruption across the route continues to be handled well with high passenger satisfaction scores. TransPennine Trains' existing diesel-only fleet will also be replaced to maximise the new electrification capability. Whilst detailed discussions are taking place regarding their specification, procurement is progressing with a contract award expected in summer 2025. A Cost Efficiency panel, chaired by DfT's Non-Executive Director to the programme, has also been established to monitor progress towards securing additional efficiencies. In February 2025, a new Managing Director commenced in role, as well as a new permanent SRO, bringing stability to the programme's leadership.","startDate":"2017-07-01","endDate":"2041-10-17","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 17/10/2041. This is primarily due to a recent, successful re-baselining exercise that sees all Key Output realisation dates aligned with Programme Business Case 2 (PBC2) commitments. The bulk of TRU's benefits will be delivered by the mid-2030s, with additional digital signalling capability becoming available by the early 2040s. The programme has a stable integrated schedule that was recently updated. Baseline 2.1 was agreed last year between Enterprise partners and maintains Key Output dates for KO1 to KO5b as agreed at PBC2, as well as the PBC2 funding position for all infrastructure sub-projects. Baseline 2.1 creates a stable programme baseline position with a realistic and achievable critical path now committed to with both delivery Alliances as part of the W34 and E234 contract awards. It also forecasts P50 and P80 delivery dates and timelines for benefits delivery. The approval of the TOC-Business Case in March 2025, confirmed alignment of train-operator related delivery plans with Baseline 2.1. KO2 (electrification of services between Manchester Victoria and Stalybridge) was completed ahead of schedule at the end of 2024, and KO3 (electrification of TransPennine Services between York and Church Fenton) is on track to be delivered by summer 2025.","fyBaseline":848.82,"fyForecast":843.99,"fyVariance":0.57,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":11056.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 11104 to 11056. This is primarily due to the following factors‚ Adjustment to reflect change in budget post Spending Review Phase 1.","benefits":2978.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 2978. This is primarily due to the following factors‚ This is because we have not restated the benefits baseline since Programme Business Case 2 (May 2023).","themes":["Delivery & schedule","Cost & funding","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to continued strong programme performance, integration of programmes across the north of England, and senior management turnover. To date, £7.3bn has been committed to the upgrade, with the…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 17/10/2041. This is primarily due to a recent, successful re-baselining exercise that sees all Key Output realisation dates aligned with Programme Business Case 2 (PBC2) commitments. The bulk of TRU's benefits will be delivered by the mid-2030s, with additional digital signalling capability becoming available by the early 2040s. The programme has a stable integrated schedule that was recently updated. Baseline 2.1 was agreed last year between Enterprise partners and maintains Key Output dates for KO1 to KO5b as agreed at PBC2, as well as the PBC2 funding position for all infrastructure sub-projects. Baseline 2.1 creates a stable programme baseline position with a realistic and achievable critical path now committed to with both delivery Alliances as part of the W34 and E234 contract awards. It also forecasts P50 and P80 delivery dates and timelines for benefits delivery. The approval of the TOC-Business Case in March 2025, confirmed alignment of train-operator related delivery plans with Baseline 2.1. KO2 (electrification of services between Manchester Victoria and Stalybridge) was completed ahead of schedule at the end of 2024, and KO3 (electrification of TransPennine Services between York and Church Fenton) is on track to be delivered by summer 2025.","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":0,"attentionScore":18,"attentionReasons":["Current published delivery confidence is Amber"]},{"id":"BEIS_0090_2122-Q4","year":2026,"name":"AUTOMOTIVE TRANSFORMATION FUND (ATF)","department":"DBT","category":"Infrastructure and Construction","description":"The Automotive Transformation Fund (ATF) is a major government programme supporting large-scale capital investment in the UK automotive sector, with a primary focus on transitioning supply chains and manufacturing capability towards zero-emission vehicles. Originally established to secure strategic inward investment and develop domestic capability in key areas such as battery manufacturing and associated supply chains, the programme has supported a portfolio of capital-intensive projects across the UK. While DRIVE35 now represents the future integrated programme for the sector, ATF continues to operate as a legacy programme, managing and delivering existing grant commitments and ensuring successful completion of funded projects. It remains a critical component of the UK’s industrial strategy, underpinning supply chain resilience and long-term competitiveness.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The current Delivery Confidence Assessment reflects the transition of ATF from an active award programme to a delivery and stewardship phase, managing a complex portfolio of high-value, long-term capital projects. Key drivers of the assessment include: the complexity and scale of funded projects, many of which involve multiple commercial partners and long delivery timelines; the ongoing need for robust monitoring, assurance, and contractual management of legacy commitments; and residual delivery risks associated with project execution, market conditions, and supply chain dependencies. Additionally, programme delivery has been impacted by organisational changes and resourcing pressures within DBT, which have required strengthening of PMO capability and oversight to maintain delivery confidence. The Department has taken steps to mitigate these risks through enhanced governance, strengthened programme management arrangements, and continued senior oversight. Overall, the programme remains deliverable, with a focus on ensuring effective oversight of existing commitments and managing risks to delivery and benefits realisation.","startDate":null,"endDate":null,"scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same at 31/03/2025. All future provision at that point moves into DRIVE35.","fyBaseline":94.92,"fyForecast":16.44,"fyVariance":82.68,"varianceNarrative":"The budget variance is less than or equal to 5%","wholeLifeCost":702.72,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 increased slightly from last year's WLC £671 to £675m.","benefits":12558.16,"benefitsNarrative":"The project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) have been reported at £1,427.4m - this is the first year that benefits have been reported.","themes":["Delivery & schedule","Cost & funding","Governance & assurance","Commercial & supply chain"],"evidenceExcerpt":"The current Delivery Confidence Assessment reflects the transition of ATF from an active award programme to a delivery and stewardship phase, managing a complex portfolio of high-value, long-term capital projects. Key drivers of the assessment include: the complexity and scale of funded projects, many of which involve multiple commercial partners and long…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same at 31/03/2025. All future provision at that point moves into DRIVE35.","narrativeClaimKind":null,"history":[{"id":"BEIS_0090_2122-Q4","year":2023,"name":"Automotive Transformation Fund","department":"DBT","category":"Infrastructure and Construction","description":"The Automotive Transformation Fund (ATF) is designed to support the creation of an internationally competitive zero emission vehicle supply chain in the UK. The ATF supports late stage R&D and capital investment across strategically important parts of the electric vehicle supply chain: batteries, motors and drives, power electronics, hydrogen fuel cells and storage tanks. Specific objectives relate to the creation and safeguarding of jobs, securing private investment, supporting the UK's role in tackling climate change by reducing global emissions from the sector, and helping to build secure and resilient supply chains and supporting EV manufacturers to meet rules of origin requirements.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 is Amber. This is primarily due to the following factors. Having surrendered some programme budget in the past year, the Automotive Transformation Fund (ATF) team will assess the impact on benefit realisation and continue to closely monitor the benefits delivered by means of annual project reviews. The team continue to assess cases in the ATF pipeline and to hold discussions with original equipment manufacturers (OEMs) regarding potential electric vehicle investments in the UK (which are complementary to the supply chain investments the ATF is designed to support) . The team will continue their engagement with industry and discussions across government to establish a long-term commitment to secure zero-emission vehicle manufacturing in the UK and improve the speed at which government provides support.","startDate":"2020-07-31","endDate":"2025-03-31","scheduleNarrative":"The project's end-date at 22/23-Q4 is 2025-03-31. This is primarily due to the following factors. Although the Automotive Transformation Fund is currently only funded to March 2025, the programme team have begun engagement with industry and discussions across government to consider how the government can build on existing interventions to take decisive action to ensure future investment in zero emission vehicle manufacturing.","fyBaseline":191.31,"fyForecast":7.42,"fyVariance":-96.0,"varianceNarrative":"The budget variance exceeds 5%. The ATF has surrendered some programme budget in the past year and other forecasted project spend has slipped right, for a number of reasons, into future years. The ATF team will assess the impact on benefit realisation and continue to closely monitor the benefits delivered by means of annual project reviews. The team will continue their engagement with industry and discussions across government to establish a long-term commitment to secure zero-emission vehicle manufacturing in the UK and improve the speed at which government provides support.","wholeLifeCost":747.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 22/23-Q4 is 747m. This is primarily due to the following factors. This was the capital funding awarded to the Automotive Transformation Fund at previous Spending Reviews.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. The project did not provide departmental-agree monetised benefits at 22/23-Q4.The project did not provide departmental-agree monetised benefits at 22/23-Q4.The project did not provide departmental-agree monetised benefits at 22/23-Q4. We updated and submitted our business case along with our bid in the last Spending Review. A complementary business case for submitted but did not get approved. As the two business cases were complementary, our analysts modelled their combined impact on the automotive industry and apportioned the benefits proportionately but as only the ATF secured additional funding analysts are now in the process of reviewing/updating the ATF business case in accordance with the Spending Review outcome and to reflect a reduction in programme budget in the years since. The impact on benefit realisation will be reviewed and the benefits profile in the business case adjusted accordingly.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule"],"evidenceExcerpt":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 is Amber. This is primarily due to the following factors. Having surrendered some programme budget in the past year, the Automotive Transformation Fund (ATF) team will assess the impact on benefit realisation and continue to closely monitor the benefits delivered by means of…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 22/23-Q4 is 2025-03-31. This is primarily due to the following factors. Although the Automotive Transformation Fund is currently only funded to March 2025, the programme team have begun engagement with industry and discussions across government to consider how the government can build on existing interventions to take decisive action to ensure future investment in zero emission vehicle manufacturing.","narrativeClaimKind":null},{"id":"BEIS_0090_2122-Q4","year":2024,"name":"Automotive Transformation Fund","department":"DBT","category":"Infrastructure and Construction","description":"The Automotive Transformation Fund (ATF) aims to support the creation of an internationally competitive electric vehicle supply chain in the UK. It provides support to late-stage R&D and capital investments in strategically important technologies. This includes unlocking strategic investments in gigafactories, motors and drives, power electronics, and fuel cell systems.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. As of March 2024, the total value of in principle and final offers made under the ATF is over 550 million. Our approach has already attracted landmark projects across the country including Tata's investment of over 4 billion in a new 40GWh gigafactory and Ford's investment of 380m in the production of electric power units at Halewood. In FY23/24 the ATF surrendered programme budget. Alongside this, significant resourcing challenges impacted the programme's ability to meet its objectives including a lack of capacity to onboard new ATF cases.The current programme will end-March 2025 but as part of the Advanced Manufacturing Plan, DBT has announced 2bn of capital and R&D funding to 2030, building on the work of the Automotive Transformation Fund and the Advanced Propulsion Centre R&D programmes. Furthermore, the ATF is currently in the process of implementing streamlining proposals to improve the efficiency of the ATF process.","startDate":"2020-07-31","endDate":"2025-03-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2025-03-31. This is primarily due to the following factors. The Automotive Transformation Fund is funded until March 2025. However, as part of the Advanced Manufacturing Plan, we have announced over 2bn of capital and R&D funding to 2030, boosting the UK's competitiveness and unlocking strategic investments in our automotive industry. This funding will be delivered via Auto2030, an ambitious programme building on the work of the Automotive Transformation Fund and the Advanced Propulsion Centre R&D programmes, ensuring continuity in HMG support.","fyBaseline":260.0,"fyForecast":162.14,"fyVariance":-38.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The Automotive Transformation Fund has surrendered some programme budget in the past year. The ATF team are in the process of assessing the impact of this on benefits realisation. Furthermore, the programme is looking to streamline the capital grants process to significantly improve the speed with which government responds to all full and complete applications for capital grants, in line with the headline recommendations from the Harrington Review into the government's approach to attracting foreign direct investment.","wholeLifeCost":671.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 decreased from 747m. to 671m. This is primarily due to the following factors. The baseline costs have been updated to reflect the funding awarded to the Automotive Transformation Fund until March 2025.","benefits":0.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 0m. The ATF will deliver monetised benefits. These are direct employment in the automotive and electrical equipment (i.e. battery) sectors, indirect employment in their supply chains, and R&D spillover returns. The ATF analysts are in the process of reviewing/updating the ATF business case to produce an updated benefits section according to best practice principles which is with HMT for approval. It will ensure alignment of the identified benefits with the GMPP's format and will address reductions in the ATF budget which have occurred to date. Furthermore, there are significant wider benefits such as global CO2 emissions savings and a contribution to reducing regional inequalities in the UK, which will not be included in the monetised appraisal.","themes":["Cost & funding","Delivery & schedule","Workforce & capability","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. As of March 2024, the total value of in principle and final offers made under the ATF is over 550 million. Our approach has already attracted landmark projects across the…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2025-03-31. This is primarily due to the following factors. The Automotive Transformation Fund is funded until March 2025. However, as part of the Advanced Manufacturing Plan, we have announced over 2bn of capital and R&D funding to 2030, boosting the UK's competitiveness and unlocking strategic investments in our automotive industry. This funding will be delivered via Auto2030, an ambitious programme building on the work of the Automotive Transformation Fund and the Advanced Propulsion Centre R&D programmes, ensuring continuity in HMG support.","narrativeClaimKind":null},{"id":"BEIS_0090_2122-Q4","year":2025,"name":"AUTOMOTIVE TRANSFORMATION FUND (ATF)","department":"DBT","category":"Infrastructure and Construction","description":"The Automotive Transformation Fund (ATF) aims to support the creation of an internationally competitive electric vehicle supply chain in the UK. It provides support to late-stage R&D and capital investments in strategically important technologies. This includes unlocking strategic investments in gigafactories, motors and drives, power electronics, and fuel cell systems.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ ATF funding has already helped secure key investments, including Nissan’s £2 billion investment to produce two new electric vehicle models in Sunderland building on the £1 billion electric vehicle hub announced by Nissan and their battery partner AESC in 2021,Ford’s investment of £380m in the production of electric power units at Halewood, Johnson Matthey’s investment of more than £60 million in Hertfordshire to develop hydrogen technologies. Alongside this, significant resourcing challenges impacted the programme’s ability to meet its objectives including a lack of capacity to onboard new ATF cases.​ The current programme ended-March 2025 but as part of the Advanced Manufacturing Plan, DBT will announced a £2bn of capital and R&D funding to 2030, building on the work of the Automotive Transformation Fund and the Advanced Propulsion Centre R&D programmes.","startDate":"2020-07-31","endDate":null,"scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2025. This is primarily due to the following factors‚ The Automotive Transformation Fund is funded until March 2025. However, as part of the Advanced Manufacturing Plan, we have announced over £2bn of capital and R&D funding to 2030, boosting the UK’s competitiveness and unlocking strategic investments in our automotive industry. This funding will be delivered via DRIVE35, an ambitious programme building on the work of the Automotive Transformation Fund and the Advanced Propulsion Centre R&D programmes, ensuring continuity in HMG support.","fyBaseline":260.0,"fyForecast":162.14,"fyVariance":37.64,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The Automotive Transformation Fund has surrendered some programme budget in the past year. The ATF team will assess the impact of this on benefits realisation.","wholeLifeCost":671.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 671. This is primarily due to the following factors‚ The baseline costs have been updated to reflect the funding awarded to the Automotive Transformation Fund until March 2025.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ The ATF will deliver monetised benefits. These are direct employment in the automotive and electrical equipment (i.e. battery) sectors, indirect employment in their supply chains, and R&D spillover returns. The ATF analysts are in the process of reviewing/updating the ATF business case to produce an updated benefits section according to best practice principles. It will ensure alignment of the identified benefits with the GMPP’s format and will address reductions in the ATF budget which have occurred to date. Furthermore, there are significant wider benefits such as global CO2 emissions savings and a contribution to reducing regional inequalities in the UK, which will not be included in the monetised appraisal.","themes":["Cost & funding","Workforce & capability","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ ATF funding has already helped secure key investments, including Nissan’s £2 billion investment to produce two new electric vehicle models in Sunderland building on…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2025. This is primarily due to the following factors‚ The Automotive Transformation Fund is funded until March 2025. However, as part of the Advanced Manufacturing Plan, we have announced over £2bn of capital and R&D funding to 2030, boosting the UK’s competitiveness and unlocking strategic investments in our automotive industry. This funding will be delivered via DRIVE35, an ambitious programme building on the work of the Automotive Transformation Fund and the Advanced Propulsion Centre R&D programmes, ensuring continuity in HMG support.","narrativeClaimKind":null},{"id":"BEIS_0090_2122-Q4","year":2026,"name":"AUTOMOTIVE TRANSFORMATION FUND (ATF)","department":"DBT","category":"Infrastructure and Construction","description":"The Automotive Transformation Fund (ATF) is a major government programme supporting large-scale capital investment in the UK automotive sector, with a primary focus on transitioning supply chains and manufacturing capability towards zero-emission vehicles. Originally established to secure strategic inward investment and develop domestic capability in key areas such as battery manufacturing and associated supply chains, the programme has supported a portfolio of capital-intensive projects across the UK. While DRIVE35 now represents the future integrated programme for the sector, ATF continues to operate as a legacy programme, managing and delivering existing grant commitments and ensuring successful completion of funded projects. It remains a critical component of the UK’s industrial strategy, underpinning supply chain resilience and long-term competitiveness.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The current Delivery Confidence Assessment reflects the transition of ATF from an active award programme to a delivery and stewardship phase, managing a complex portfolio of high-value, long-term capital projects. Key drivers of the assessment include: the complexity and scale of funded projects, many of which involve multiple commercial partners and long delivery timelines; the ongoing need for robust monitoring, assurance, and contractual management of legacy commitments; and residual delivery risks associated with project execution, market conditions, and supply chain dependencies. Additionally, programme delivery has been impacted by organisational changes and resourcing pressures within DBT, which have required strengthening of PMO capability and oversight to maintain delivery confidence. The Department has taken steps to mitigate these risks through enhanced governance, strengthened programme management arrangements, and continued senior oversight. Overall, the programme remains deliverable, with a focus on ensuring effective oversight of existing commitments and managing risks to delivery and benefits realisation.","startDate":null,"endDate":null,"scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same at 31/03/2025. All future provision at that point moves into DRIVE35.","fyBaseline":94.92,"fyForecast":16.44,"fyVariance":82.68,"varianceNarrative":"The budget variance is less than or equal to 5%","wholeLifeCost":702.72,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 increased slightly from last year's WLC £671 to £675m.","benefits":12558.16,"benefitsNarrative":"The project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) have been reported at £1,427.4m - this is the first year that benefits have been reported.","themes":["Delivery & schedule","Cost & funding","Governance & assurance","Commercial & supply chain"],"evidenceExcerpt":"The current Delivery Confidence Assessment reflects the transition of ATF from an active award programme to a delivery and stewardship phase, managing a complex portfolio of high-value, long-term capital projects. Key drivers of the assessment include: the complexity and scale of funded projects, many of which involve multiple commercial partners and long…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same at 31/03/2025. All future provision at that point moves into DRIVE35.","narrativeClaimKind":null}],"previous":{"id":"BEIS_0090_2122-Q4","year":2025,"name":"AUTOMOTIVE TRANSFORMATION FUND (ATF)","department":"DBT","category":"Infrastructure and Construction","description":"The Automotive Transformation Fund (ATF) aims to support the creation of an internationally competitive electric vehicle supply chain in the UK. It provides support to late-stage R&D and capital investments in strategically important technologies. This includes unlocking strategic investments in gigafactories, motors and drives, power electronics, and fuel cell systems.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ ATF funding has already helped secure key investments, including Nissan’s £2 billion investment to produce two new electric vehicle models in Sunderland building on the £1 billion electric vehicle hub announced by Nissan and their battery partner AESC in 2021,Ford’s investment of £380m in the production of electric power units at Halewood, Johnson Matthey’s investment of more than £60 million in Hertfordshire to develop hydrogen technologies. Alongside this, significant resourcing challenges impacted the programme’s ability to meet its objectives including a lack of capacity to onboard new ATF cases.​ The current programme ended-March 2025 but as part of the Advanced Manufacturing Plan, DBT will announced a £2bn of capital and R&D funding to 2030, building on the work of the Automotive Transformation Fund and the Advanced Propulsion Centre R&D programmes.","startDate":"2020-07-31","endDate":null,"scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2025. This is primarily due to the following factors‚ The Automotive Transformation Fund is funded until March 2025. However, as part of the Advanced Manufacturing Plan, we have announced over £2bn of capital and R&D funding to 2030, boosting the UK’s competitiveness and unlocking strategic investments in our automotive industry. This funding will be delivered via DRIVE35, an ambitious programme building on the work of the Automotive Transformation Fund and the Advanced Propulsion Centre R&D programmes, ensuring continuity in HMG support.","fyBaseline":260.0,"fyForecast":162.14,"fyVariance":37.64,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The Automotive Transformation Fund has surrendered some programme budget in the past year. The ATF team will assess the impact of this on benefits realisation.","wholeLifeCost":671.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 671. This is primarily due to the following factors‚ The baseline costs have been updated to reflect the funding awarded to the Automotive Transformation Fund until March 2025.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ The ATF will deliver monetised benefits. These are direct employment in the automotive and electrical equipment (i.e. battery) sectors, indirect employment in their supply chains, and R&D spillover returns. The ATF analysts are in the process of reviewing/updating the ATF business case to produce an updated benefits section according to best practice principles. It will ensure alignment of the identified benefits with the GMPP’s format and will address reductions in the ATF budget which have occurred to date. Furthermore, there are significant wider benefits such as global CO2 emissions savings and a contribution to reducing regional inequalities in the UK, which will not be included in the monetised appraisal.","themes":["Cost & funding","Workforce & capability","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ ATF funding has already helped secure key investments, including Nissan’s £2 billion investment to produce two new electric vehicle models in Sunderland building on…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2025. This is primarily due to the following factors‚ The Automotive Transformation Fund is funded until March 2025. However, as part of the Advanced Manufacturing Plan, we have announced over £2bn of capital and R&D funding to 2030, boosting the UK’s competitiveness and unlocking strategic investments in our automotive industry. This funding will be delivered via DRIVE35, an ambitious programme building on the work of the Automotive Transformation Fund and the Advanced Propulsion Centre R&D programmes, ensuring continuity in HMG support.","narrativeClaimKind":null},"ratingDelta":-1,"transition":"Improved","endDateDeltaDays":null,"attentionScore":15,"attentionReasons":["In-year forecast variance is +82.7%"]},{"id":"DESNZ_0333_2324-Q4","year":2026,"name":"Review of Electricity Market Arrangements (REMA)","department":"DESNZ","category":"Government Transformation and Service Delivery","description":"The Review of Electricity Market Arrangements (REMA) Programme was set up in 2022 to consider how best to deliver a fair, affordable and secure power system. The review concluded in July 2025 with the Secretary of State taking the decision to retain a single national GB-wide wholesale market and introduce an ambitious package of reform to improve the efficiency of our future power system under a new programme called Reformed National Pricing (RNP). As such, the REMA Programme was officially closed in summer 2025 and offboarded as a GMPP programme at the end of the 2025/26 financial year.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Review of Electricity Market Arrangements (REMA) was successfully delivered in July 2025 with the Secretary of State's decision to retain and reform a national electricity market.","startDate":"2024-02-05","endDate":"2026-04-30","scheduleNarrative":"The Review of Electricity Market Arrangements (REMA) was successfully delivered in July 2025 with the Secretary of State's decision to retain and reform a national electricity market. The schedule to deliver on the Secretary of State's decision will be carried out under the programme called Reformed National Pricing (RNP).","fyBaseline":7.58,"fyForecast":3.54,"fyVariance":53.38,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the Programme closing in July 2025, with costs incurred reflecting REMA’s full lifecycle to closure, compared against a full-year 2025/26 budget profile","wholeLifeCost":29.18,"costNarrative":"The Whole Life Costs for REMA provides the total cost of the programme from it's inception in 2022 through to it's closure in July 2025, following the successful delivery of the programme that led to the Secretary of State's decision to retain and reform a national electricity market.","benefits":null,"benefitsNarrative":"Exempt under Section 22 - Information intended for future publication","themes":["Commercial & supply chain","Approvals & decisions","Cost & funding","Delivery & schedule"],"evidenceExcerpt":"The Review of Electricity Market Arrangements (REMA) was successfully delivered in July 2025 with the Secretary of State's decision to retain and reform a national electricity market. The Review of Electricity Market Arrangements (REMA) was successfully delivered in July 2025 with the Secretary of State's decision to retain and reform a national electricity…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The Review of Electricity Market Arrangements (REMA) was successfully delivered in July 2025 with the Secretary of State's decision to retain and reform a national electricity market. The schedule to deliver on the Secretary of State's decision will be carried out under the programme called Reformed National Pricing (RNP).","narrativeClaimKind":null,"history":[{"id":"DESNZ_0333_2324-Q4","year":2024,"name":"Review of Electricity Market Arrangements (REMA)","department":"DESNZ","category":"Government Transformation and Service Delivery","description":"Reforming electricity markets through the Review of Electricity Market Arrangements (REMA) programme is vital to the delivery of the government's plan to deliver a fully decarbonised electricity system by 2035, subject to security of supply.The aim of the Programme is to identify and implement the necessary reforms for electricity market arrangements. This is aimed at driving the required investment and ensuring the efficient operation of a secure, low-carbon electricity system by 2035.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. The Programme Plan up to December 2024 was approved by the Programme Board on 27th March 2024 and the Integrated Assurance and Approvals Plans (IAAP) and Risk Potential Assessment (RPA) were approved. A Gateway 1 Review Assessment meeting took place on the 25th March 2024, which set the scope of the review. Keyholders still to be allocated to support development of the Strategic Outline Business Case (SOBC), however required documentation has been shared with (Portfolio and Investment Committee) PIC.","startDate":"2024-02-05","endDate":"2035-12-31","scheduleNarrative":"The project's end-date at 23/24-Q4 is 2035-12-31. This is primarily due to the following factors. Reforming electricity markets through the Review of Electricity Market Arrangements (REMA) programme is vital to the delivery of the government's plan to deliver a fully decarbonised electricity system by 2035","fyBaseline":4.63,"fyForecast":4.19,"fyVariance":-10.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. REMAs budget settlement details are still to be defined for this financial year 24/25, pending conclusion of the departmental business planning process.","wholeLifeCost":11.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 23/24-Q4 is 11m. This is primarily due to the following factors. This WLC Covers Programme (Resource) Costs to 2035.","benefits":0.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 0m. There are a range of underlying market failures and limitations of existing interventions which mean that the current electricity market framework will not deliver the investment in the kinds of technologies at the capacity that we need. The intended REMA outcomes for 2035 are to Achieve Net Zero, Securing Energy Supply and delivering Reasonable Price to Consumers. However, intended outcomes and benefits to consumers and industry will be dependent on policy options the REMA Programme takes taken to implementation which will be unknown until Summer 2025. Without market reform, system costs over the period 2030-2050 could be around 35bn higher (2023 prices) with carbon emissions that exceed our CB6 and Net Zero commitments. Around half of these additional costs stem from capacity building in sub-optimal locations, and the remainder from having to build unabated gas in order to meet the demand for flexible supply in the absence of low carbon flexible technologies. The Programme offers several benefits, including reducing carbon emissions, enhancing energy security, ensuring greater cost-effectiveness of the electricity system, and delivering fair consumer deals. Additionally, it facilitates the decarbonisation of heat and transport through electrification.","themes":["Cost & funding","Governance & assurance","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. The Programme Plan up to December 2024 was approved by the Programme Board on 27th March 2024 and the Integrated Assurance and Approvals Plans (IAAP) and Risk Potential Assessment (RPA) were approved. A Gateway 1 Review…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 23/24-Q4 is 2035-12-31. This is primarily due to the following factors. Reforming electricity markets through the Review of Electricity Market Arrangements (REMA) programme is vital to the delivery of the government's plan to deliver a fully decarbonised electricity system by 2035","narrativeClaimKind":null},{"id":"DESNZ_0333_2324-Q4","year":2025,"name":"Review of Electricity Market Arrangements (REMA)","department":"DESNZ","category":"Government Transformation and Service Delivery","description":"Markets are at the heart of the GB electricity system. They drive competition and innovation to benefit consumers. They provide price signals which guide decisions on electricity supply and demand, investment in new generating capacity and flexibility, and the efficient operation of the system. Reforming electricity markets through REMA is therefore at the heart of the Government’s ambitions to transform the power sector. Our underlying electricity market arrangements were adopted in an era of large, centralised, dispatchable unabated fossil fuel-based generation. The previous major round of electricity market reform (EMR) which ran from 2010-13, focused on how best to scale-up low-carbon renewable generation in a power system still largely designed for fossil fuel technologies – by accelerating the journey to a renewables-based system through a new Contracts for Difference (CfD) scheme while ensuring security of supply by introducing the Capacity Market (CM) scheme. The purpose of REMA is to explore options to evolve the foundations of the electricity market and make it fit-for-purpose to move to low-carbon technologies, while managing a smooth and low-cost transition away from our remaining unabated fossil fuel generation capacity.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ No decision has been taken yet on whether to adopt Zonal Pricing or Reformed National Pricing. We plan to provide clarity to bidders ahead of AR7 opening in summer. This tight timeframe is impacting our delivery confidence.","startDate":"2024-02-05","endDate":"2035-12-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/12/2035. This is primarily due to the following factors‚ no decision having as yet been taken on whether to adopt Zonal Pricing or Reformed National Pricing. We plan to provide clarity to bidders ahead of AR7 opening in summer.","fyBaseline":9.67,"fyForecast":9.34,"fyVariance":3.41,"varianceNarrative":"The budget variance is less than or equal to 5%. The in-year variance is within the stated tolerance +/- 5%.","wholeLifeCost":null,"costNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","benefits":null,"benefitsNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","themes":["Cost & funding","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ No decision has been taken yet on whether to adopt Zonal Pricing or Reformed National Pricing. We plan to provide clarity to bidders ahead of AR7 opening in summer.…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/12/2035. This is primarily due to the following factors‚ no decision having as yet been taken on whether to adopt Zonal Pricing or Reformed National Pricing. We plan to provide clarity to bidders ahead of AR7 opening in summer.","narrativeClaimKind":null},{"id":"DESNZ_0333_2324-Q4","year":2026,"name":"Review of Electricity Market Arrangements (REMA)","department":"DESNZ","category":"Government Transformation and Service Delivery","description":"The Review of Electricity Market Arrangements (REMA) Programme was set up in 2022 to consider how best to deliver a fair, affordable and secure power system. The review concluded in July 2025 with the Secretary of State taking the decision to retain a single national GB-wide wholesale market and introduce an ambitious package of reform to improve the efficiency of our future power system under a new programme called Reformed National Pricing (RNP). As such, the REMA Programme was officially closed in summer 2025 and offboarded as a GMPP programme at the end of the 2025/26 financial year.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Review of Electricity Market Arrangements (REMA) was successfully delivered in July 2025 with the Secretary of State's decision to retain and reform a national electricity market.","startDate":"2024-02-05","endDate":"2026-04-30","scheduleNarrative":"The Review of Electricity Market Arrangements (REMA) was successfully delivered in July 2025 with the Secretary of State's decision to retain and reform a national electricity market. The schedule to deliver on the Secretary of State's decision will be carried out under the programme called Reformed National Pricing (RNP).","fyBaseline":7.58,"fyForecast":3.54,"fyVariance":53.38,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the Programme closing in July 2025, with costs incurred reflecting REMA’s full lifecycle to closure, compared against a full-year 2025/26 budget profile","wholeLifeCost":29.18,"costNarrative":"The Whole Life Costs for REMA provides the total cost of the programme from it's inception in 2022 through to it's closure in July 2025, following the successful delivery of the programme that led to the Secretary of State's decision to retain and reform a national electricity market.","benefits":null,"benefitsNarrative":"Exempt under Section 22 - Information intended for future publication","themes":["Commercial & supply chain","Approvals & decisions","Cost & funding","Delivery & schedule"],"evidenceExcerpt":"The Review of Electricity Market Arrangements (REMA) was successfully delivered in July 2025 with the Secretary of State's decision to retain and reform a national electricity market. The Review of Electricity Market Arrangements (REMA) was successfully delivered in July 2025 with the Secretary of State's decision to retain and reform a national electricity…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The Review of Electricity Market Arrangements (REMA) was successfully delivered in July 2025 with the Secretary of State's decision to retain and reform a national electricity market. The schedule to deliver on the Secretary of State's decision will be carried out under the programme called Reformed National Pricing (RNP).","narrativeClaimKind":null}],"previous":{"id":"DESNZ_0333_2324-Q4","year":2025,"name":"Review of Electricity Market Arrangements (REMA)","department":"DESNZ","category":"Government Transformation and Service Delivery","description":"Markets are at the heart of the GB electricity system. They drive competition and innovation to benefit consumers. They provide price signals which guide decisions on electricity supply and demand, investment in new generating capacity and flexibility, and the efficient operation of the system. Reforming electricity markets through REMA is therefore at the heart of the Government’s ambitions to transform the power sector. Our underlying electricity market arrangements were adopted in an era of large, centralised, dispatchable unabated fossil fuel-based generation. The previous major round of electricity market reform (EMR) which ran from 2010-13, focused on how best to scale-up low-carbon renewable generation in a power system still largely designed for fossil fuel technologies – by accelerating the journey to a renewables-based system through a new Contracts for Difference (CfD) scheme while ensuring security of supply by introducing the Capacity Market (CM) scheme. The purpose of REMA is to explore options to evolve the foundations of the electricity market and make it fit-for-purpose to move to low-carbon technologies, while managing a smooth and low-cost transition away from our remaining unabated fossil fuel generation capacity.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ No decision has been taken yet on whether to adopt Zonal Pricing or Reformed National Pricing. We plan to provide clarity to bidders ahead of AR7 opening in summer. This tight timeframe is impacting our delivery confidence.","startDate":"2024-02-05","endDate":"2035-12-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/12/2035. This is primarily due to the following factors‚ no decision having as yet been taken on whether to adopt Zonal Pricing or Reformed National Pricing. We plan to provide clarity to bidders ahead of AR7 opening in summer.","fyBaseline":9.67,"fyForecast":9.34,"fyVariance":3.41,"varianceNarrative":"The budget variance is less than or equal to 5%. The in-year variance is within the stated tolerance +/- 5%.","wholeLifeCost":null,"costNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","benefits":null,"benefitsNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","themes":["Cost & funding","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ No decision has been taken yet on whether to adopt Zonal Pricing or Reformed National Pricing. We plan to provide clarity to bidders ahead of AR7 opening in summer.…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/12/2035. This is primarily due to the following factors‚ no decision having as yet been taken on whether to adopt Zonal Pricing or Reformed National Pricing. We plan to provide clarity to bidders ahead of AR7 opening in summer.","narrativeClaimKind":null},"ratingDelta":-1,"transition":"Improved","endDateDeltaDays":-3532,"attentionScore":15,"attentionReasons":["In-year forecast variance is +53.4%"]},{"id":"DFT_0048_2021-Q3","year":2026,"name":"2ND GENERATION UK SEARCH AND RESCUE AVIATION","department":"DFT","category":"Government Transformation and Service Delivery","description":"The UKSAR2G programme’s purpose is to procure a national UK aviation search and rescue (SAR) service that continues to save lives, protect UK economic interests and continue to comply with International Conventions beyond the end of the existing UKSAR Helicopter contract in 2024-26.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at green. This is primarily due to the programme remaining on track for all air stations to go live under SAR2G by Jan 2027, the project remains within financial approvals and it continues the service continues to undertake Search and Rescue when needed.","startDate":"2019-12-16","endDate":"2027-01-01","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same as last year's published end-date. This is primarily due to the continued forecast for the last air base to have transitioned to SAR2G by Jan 2027.","fyBaseline":196.42,"fyForecast":186.51,"fyVariance":5.04,"varianceNarrative":"The budget variance exceeds 5%. (5.04%) This is primarily due to one aircraft that was due to come online in Q4 not being realised until Period 1 of FY 26/27.","wholeLifeCost":2046.47,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) remained at £1,959.436. This is primarily due to the following factors. Even though there has been some increase in inflation figures some costs have been recovered through KPI relief on those parts of the contract that has transitioned. Although some variance in reported figures and held figures is noted this is due to the NISTA deflation of the figures.","benefits":25465.07,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at £24,474.990. Although some variance in reported figures and held figures is noted this is due to the NISTA deflation of the figures.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at green. This is primarily due to the programme remaining on track for all air stations to go live under SAR2G by Jan 2027, the project remains within financial approvals and it continues the service continues to undertake Search and Rescue when…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":true,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same as last year's published end-date. This is primarily due to the continued forecast for the last air base to have transitioned to SAR2G by Jan 2027.","narrativeClaimKind":"says-unchanged","history":[{"id":"DFT_0048_2021-Q3","year":2021,"name":"UK Second Generation Search & Rescue Aviation Programme","department":"DFT","category":"Government Transformation and Service Delivery","description":"The UK Search and Rescue 2nd Generation (UKSAR2G) programme is the UKs replacement aviation Search and Rescue (SAR) service that will continue to save lives, protect the UKs economic interests and maintains aeronautical compliance with International Conventions beyond 2024.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber/Green.This is primarily due to the following factors: The Gateway Review found that the UKSAR2G Programme is a well-established and constructed programme which seeks to deliver a vital emergency service without a loss of continuity to the current Coastguard aviation services. It praised the clear objectives, strong leadership and sound Governance. The review stated that there is a strong evidence base supporting the programme with robust modelling against which the Programme team can assess future potential solutions. It remarked on the high degree of transparency there has been with the market. The review felt that the strategic and economic cases were particularly compelling with a clear delivery strategy and was complimentary of the amount of stakeholder engagement there has been so far. The review stated that the Programme is inclusive of smaller, agile suppliers who might drive innovation. The review team's assessment was influenced by the need to make greater use of project and programme tools, the impact of IFRS16 has on accounting for leases and affordability more generally, and the complexity of the stakeholder community.","startDate":"2019-12-16","endDate":"2026-12-31","scheduleNarrative":"The project end-date is 31 December 2026. This is primarily due to the following factors: Programme milestones and outputs have consistently been met through 2020/21. Following reassuring feedback from assurance reviews, scrutiny panels (internal and external), a successful IPA Gateway 2 Review and Cabinet and HM Treasury approval of the Outline Business Case. Procurement has been launched and the key milestone of contract award in Q3 2022 remains on target.","fyBaseline":0.0,"fyForecast":0.0,"fyVariance":null,"varianceNarrative":"The GMPP project did not provide data","wholeLifeCost":2606.77,"costNarrative":"The projects Baseline Whole Life Cost is �2606.77m. This is primarily due to the following factors: Should Cost Modelling for the Outline Business Case (OBC) has presented a contract price of �2.607bn incl. irrecoverable VAT for a 10 year operational period. The OBC has cleared DfT's approval boards, the Cabinet Office and HM Treasury. It has been agreed with DfT and HM Treasury that pre-operational costs will be based on a milestone approach and these will be paid to suppliers as services commence at each base under UKSAR2G. This approach means that more costs will be brought forward into the early part of the contract, but the later years will reduce accordingly and the overall effect is a �115m budget saving. The Spending Review submission for 2021 will illustrate this clearly.","benefits":null,"benefitsNarrative":"","themes":["Governance & assurance","Commercial & supply chain","Approvals & decisions","Cost & funding"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber/Green.This is primarily due to the following factors: The Gateway Review found that the UKSAR2G Programme is a well-established and constructed programme which seeks to deliver a vital emergency service without a loss of continuity to the current Coastguard aviation…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project end-date is 31 December 2026. This is primarily due to the following factors: Programme milestones and outputs have consistently been met through 2020/21. Following reassuring feedback from assurance reviews, scrutiny panels (internal and external), a successful IPA Gateway 2 Review and Cabinet and HM Treasury approval of the Outline Business Case. Procurement has been launched and the key milestone of contract award in Q3 2022 remains on target.","narrativeClaimKind":null},{"id":"DFT_0048_2021-Q3","year":2022,"name":"2nd Generation UK Search and Rescue Aviation","department":"DFT","category":"Government Transformation and Service Delivery","description":"The UK Search and Rescue 2nd Generation (UKSAR2G) programme is the UK's replacement aviation Search and Rescue (SAR) and Aerial Surveillance (ASV) services that will continue to save lives, protect the UK's economic interests and maintain aeronautical compliance with International Conventions beyond 2024.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 20/21-Q4, the Delivery Confidence Assessment rating at 21/22-Q4 decreased from Amber/Green to Green. 2021/22 saw the completion of the initial tender evaluation and consensus, Commercial Assurance Board (CAB) Stage 5 and conclusion of a 3 week Negotiation Stage with the Participants and the development of the Invitation to Submit Final Tender (ITSFT). The negotiations demonstrated that the delivery of the programme remains on schedule. Completion of the negotiation stage and the relaxation of Covid-19 restrictions have also led to the removal of several key risks. It is for this reason that the SRO Quality Assessment has been improved from Amber to Green. As Senior Responsible Officer (SRO) I will ensure that the remaining bidder delivers on their negotiated agreements and remains focused on delivering Value for Money. The Gateway Review found that the UKSAR2G Programme is a well-established and constructed programme which seeks to deliver a vital emergency service without a loss of continuity to the current Coastguard aviation services. It praised the clear objectives, strong leadership and sound Governance. The review stated that there is a strong evidence base supporting the programme with robust modelling against which the Programme team can assess future potential solutions. It remarked on the high degree of transparency there has been with the market. The review felt that the strategic and economic cases were particularly compelling with an equally clear delivery strategy. The review was complimentary of the amount of stakeholder engagement there has been so far. The review stated that the Programme is inclusive of smaller, agile suppliers who might drive innovation. The review team's assessment was influenced by the need to make greater use of project and programme tools, the impact of IFRS16 and affordability more generally, and the complexity of the stakeholder community.","startDate":"2019-12-16","endDate":"2026-12-31","scheduleNarrative":"Compared to 2021-Q4, your project end-date remained scheduled to finish on 31 DEC 2026. This is primarily due to the following factors: Programme milestones and outputs have consistently been met through 2021/22. Highlights include the completion of the Selection Questionnaire, Initial Tender and Negotiation Stage. Contract Award remains on target for Q3 2022/23, which will require HM Treasury approval of the Full Business Case, following completion of the Final Tender. Following input from the market, it is considered that the Transition Phase timescale of the programme remains both realistic and achievable.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"The GMPP project did not provide data","wholeLifeCost":2607.0,"costNarrative":"Compared to 2021-Q4,the projects Baseline Whole Life Cost remained at 2606.77 (£m). This is primarily due to the following factors: Should Cost Modelling for the Outline Business Case (OBC), approved by HM Treasury, proposed a contract price of £2.607bn including irrecoverable VAT for a 10 year operational period. It has been agreed with DfT and HM Treasury that pre-operational costs will be based on a milestone approach and these will be paid to suppliers as services commence at each base under UKSAR2G. This approach means that more costs will be brought forward in to the early part of the contract, but the later years' costs will reduce accordingly resulting in an overall £115m budget saving.","benefits":null,"benefitsNarrative":"","themes":["Commercial & supply chain","Governance & assurance","Delivery & schedule","Cost & funding"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Delivery Confidence Assessment rating at 21/22-Q4 decreased from Amber/Green to Green. 2021/22 saw the completion of the initial tender evaluation and consensus, Commercial Assurance Board (CAB) Stage 5 and conclusion of a 3 week Negotiation Stage with the Participants and the development of the Invitation to Submit…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to 2021-Q4, your project end-date remained scheduled to finish on 31 DEC 2026. This is primarily due to the following factors: Programme milestones and outputs have consistently been met through 2021/22. Highlights include the completion of the Selection Questionnaire, Initial Tender and Negotiation Stage. Contract Award remains on target for Q3 2022/23, which will require HM Treasury approval of the Full Business Case, following completion of the Final Tender. Following input from the market, it is considered that the Transition Phase timescale of the programme remains both realistic and achievable.","narrativeClaimKind":null},{"id":"DFT_0048_2021-Q3","year":2023,"name":"2nd Generation UK Search and Rescue Aviation","department":"DFT","category":"Government Transformation and Service Delivery","description":"The UK Search and Rescue Second Generation (UKSAR2G) programmes is the UK's replacement aviation Search and Rescue (SAR) and Aerial Surveillance and Verification (ASV) services that will continue to save lives, protect the UK's economic interests and maintain aeronautical compliance with International Conventions beyond 2024.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 21/22-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 remained at Green. This is primarily due to the following factors. The tender assessment was completed and the contract awarded to Bristow Helicopters Ltd. The programme is mobilising and regular meetings have been established between the MCA and BHL. Internal workstreams are being established to manage the transition between the old and the new contracts.The Gateway Review found that the Programme is well-established and constructed and seeks to deliver a vital emergency service without loss of continuity.","startDate":"2019-12-16","endDate":"2026-12-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2026-12-31. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2026-12-31. This is primarily due to the following factors. The contract has been awarded and the FBC approved. The contracted schedule maintains the projected end date.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"The GMPP project did not provide data","wholeLifeCost":1959.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 decreased from 2607m. to 1959m. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 decreased from 2607m. to 1959m. This is primarily due to the following factors. The cost of the accepted bid was lower than anticipated and this has been reflected in the Full Business Case which has been approved by DfT and HMT. Milestone payments will be made as each base transitions to service.","benefits":24475.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 24475m. The project departmental-agree Benefits at 22/23-Q4 is 24.5b. The project is in its mobilisation phase. The Search and Recue bases will transition to the new service between October 2024 and January 2027, during which, the benefits will start to be realised as the assets respond to incidents. The actual benefits annual benefits will progressively increase as each base transitions to this new contract. The majority of the benefit value is derived from the lives saved by the service.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 remained at Green. This is primarily due to the following factors. The tender assessment was completed and the contract awarded to Bristow Helicopters Ltd. The programme is mobilising and regular meetings have been established between the…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2026-12-31. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2026-12-31. This is primarily due to the following factors. The contract has been awarded and the FBC approved. The contracted schedule maintains the projected end date.","narrativeClaimKind":null},{"id":"DFT_0048_2021-Q3","year":2024,"name":"2nd Generation UK Search and Rescue Aviation","department":"DFT","category":"Government Transformation and Service Delivery","description":"The UK Search and Rescue Second Generation (ULSAR2G) programme is the UK's replacement aviation Search & Rescue (SAR) and Ariel Surveillance (ASV) services that will continue to save lives, protect the UK's economic interests and maintain aeronautical compliance with International Conventions beyond 2024.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Green. This is primarily due to the following factors. The programme is now in the mobilisation phase prior to transition. This is going well with regular meetings between MCA and BHL. Internal workstreams are established and preparing for the transition phase between the old and new contracts._x000D_ _x000D_ The recent Government Internal Assurance Assessment and IPA Gate 4 (Readiness for Service) have found that the programme is well led with well established governance.","startDate":"2019-12-16","endDate":"2026-12-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2026-12-31. This is primarily due to the following factors. The contracted schedule has been reviewed on a regular basis and remains on track for the projected end date.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"The project did not report yearly cost","wholeLifeCost":1959.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 remained at 1959m. This is primarily due to the following factors. The whole Life Cost remains as published in the Full Business Case. Milestone payments will be made as each base transitions into service.","benefits":24475.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 24475m. The project departmental-agree Benefits at 22/23-Q4 is 24.5b. _x000D_ _x000D_ The project is in its mobilisation phase. The Search and Recue bases will transition to the new service between October 2024 and January 2027, during which, the benefits will start to be realised as the assets respond to incidents. The actual benefits annual benefits will progressively increase as each base transitions to this new contract. The majority of the benefit value is derived from the lives saved by the service.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Green. This is primarily due to the following factors. The programme is now in the mobilisation phase prior to transition. This is going well with regular meetings between MCA and BHL. Internal workstreams are established and…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2026-12-31. This is primarily due to the following factors. The contracted schedule has been reviewed on a regular basis and remains on track for the projected end date.","narrativeClaimKind":null},{"id":"DFT_0048_2021-Q3","year":2025,"name":"2ND GENERATION UK SEARCH AND RESCUE AVIATION","department":"DfT","category":"Government Transformation and Service Delivery","description":"Following a procurement process which commenced in March 2021, the UKSAR2G contract was awarded in July 2022 to Bristow Helicopters Ltd. The UKSAR2G contract seeks to build upon the successes of its predecessors contracts to provide an aerial search and rescue (SAR) capability covering the UKs entire Search and Rescue Region of responsibility. This contract provides 18 helicopters, 6 fixed wing aircraft and an unmanned capability operating out of 10 permanent and 2 seasonal bases across the UK. Aerial SAR assets are tasked in response to 999 calls, or mayday requests to search for people who are missing or in distress, locate them and recover them from the danger they are in to a place of safety. The UKSAR2G service is the governments only civilian aerial response capability able to operate 365 days a year, 24 hours a day, at short notice. The service is estimated to rescue over 1,700 people every year; continuing to fulfil the UK’s obligations under international convention, and meeting the public expectation of delivering life-saving outcomes, saving lives more quickly and cost effectively than today.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from GREEN to AMBER. This is primarily due to the following factors‚ some early issues have arisen at the beginning of the transition phase but these provide key learning points as we move forward with the 26 month transition. As the SRO I do not currently believe that any of the issues currently seen are insurmountable or will effect the final project delivery.","startDate":"2019-12-16","endDate":"2026-12-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/12/2026. This is primarily due to the following factors‚ although there has been some movement within the schedule there are currently no factors that are likely to further effect the delivery schedule as programmed.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":1959.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 1959. This is primarily due to the following factors‚ The programme is currently early in the transition phase and only some small phased payments have been made. There is currently no indication that there will be an increase/decrease in budget requirement.","benefits":24475.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 24475. This is primarily due to the following factors‚ the programme is in the early stages of transition and full benefits analysis will not be available until after the transition (31 Dec 26)","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from GREEN to AMBER. This is primarily due to the following factors‚ some early issues have arisen at the beginning of the transition phase but these provide key learning points as we move forward with the 26 month…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/12/2026. This is primarily due to the following factors‚ although there has been some movement within the schedule there are currently no factors that are likely to further effect the delivery schedule as programmed.","narrativeClaimKind":null},{"id":"DFT_0048_2021-Q3","year":2026,"name":"2ND GENERATION UK SEARCH AND RESCUE AVIATION","department":"DFT","category":"Government Transformation and Service Delivery","description":"The UKSAR2G programme’s purpose is to procure a national UK aviation search and rescue (SAR) service that continues to save lives, protect UK economic interests and continue to comply with International Conventions beyond the end of the existing UKSAR Helicopter contract in 2024-26.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at green. This is primarily due to the programme remaining on track for all air stations to go live under SAR2G by Jan 2027, the project remains within financial approvals and it continues the service continues to undertake Search and Rescue when needed.","startDate":"2019-12-16","endDate":"2027-01-01","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same as last year's published end-date. This is primarily due to the continued forecast for the last air base to have transitioned to SAR2G by Jan 2027.","fyBaseline":196.42,"fyForecast":186.51,"fyVariance":5.04,"varianceNarrative":"The budget variance exceeds 5%. (5.04%) This is primarily due to one aircraft that was due to come online in Q4 not being realised until Period 1 of FY 26/27.","wholeLifeCost":2046.47,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) remained at £1,959.436. This is primarily due to the following factors. Even though there has been some increase in inflation figures some costs have been recovered through KPI relief on those parts of the contract that has transitioned. Although some variance in reported figures and held figures is noted this is due to the NISTA deflation of the figures.","benefits":25465.07,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at £24,474.990. Although some variance in reported figures and held figures is noted this is due to the NISTA deflation of the figures.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at green. This is primarily due to the programme remaining on track for all air stations to go live under SAR2G by Jan 2027, the project remains within financial approvals and it continues the service continues to undertake Search and Rescue when…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":true,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same as last year's published end-date. This is primarily due to the continued forecast for the last air base to have transitioned to SAR2G by Jan 2027.","narrativeClaimKind":"says-unchanged"}],"previous":{"id":"DFT_0048_2021-Q3","year":2025,"name":"2ND GENERATION UK SEARCH AND RESCUE AVIATION","department":"DfT","category":"Government Transformation and Service Delivery","description":"Following a procurement process which commenced in March 2021, the UKSAR2G contract was awarded in July 2022 to Bristow Helicopters Ltd. The UKSAR2G contract seeks to build upon the successes of its predecessors contracts to provide an aerial search and rescue (SAR) capability covering the UKs entire Search and Rescue Region of responsibility. This contract provides 18 helicopters, 6 fixed wing aircraft and an unmanned capability operating out of 10 permanent and 2 seasonal bases across the UK. Aerial SAR assets are tasked in response to 999 calls, or mayday requests to search for people who are missing or in distress, locate them and recover them from the danger they are in to a place of safety. The UKSAR2G service is the governments only civilian aerial response capability able to operate 365 days a year, 24 hours a day, at short notice. The service is estimated to rescue over 1,700 people every year; continuing to fulfil the UK’s obligations under international convention, and meeting the public expectation of delivering life-saving outcomes, saving lives more quickly and cost effectively than today.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from GREEN to AMBER. This is primarily due to the following factors‚ some early issues have arisen at the beginning of the transition phase but these provide key learning points as we move forward with the 26 month transition. As the SRO I do not currently believe that any of the issues currently seen are insurmountable or will effect the final project delivery.","startDate":"2019-12-16","endDate":"2026-12-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/12/2026. This is primarily due to the following factors‚ although there has been some movement within the schedule there are currently no factors that are likely to further effect the delivery schedule as programmed.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":1959.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 1959. This is primarily due to the following factors‚ The programme is currently early in the transition phase and only some small phased payments have been made. There is currently no indication that there will be an increase/decrease in budget requirement.","benefits":24475.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 24475. This is primarily due to the following factors‚ the programme is in the early stages of transition and full benefits analysis will not be available until after the transition (31 Dec 26)","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from GREEN to AMBER. This is primarily due to the following factors‚ some early issues have arisen at the beginning of the transition phase but these provide key learning points as we move forward with the 26 month…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/12/2026. This is primarily due to the following factors‚ although there has been some movement within the schedule there are currently no factors that are likely to further effect the delivery schedule as programmed.","narrativeClaimKind":null},"ratingDelta":-1,"transition":"Improved","endDateDeltaDays":1,"attentionScore":14,"attentionReasons":["Published commentary says the end date is unchanged while the published date moved","Published end date moved 1 days later","In-year forecast variance is +5.0%"]},{"id":"MOD_0080_1213-Q1","year":2026,"name":"DREADNOUGHT","department":"MOD","category":"Military Capability","description":"The Dreadnought Programme will maintain the UK's sovereign ability to deliver a deterrent effect by means of a submarine-launched; inter-continental ballistic missile nuclear weapon capability. The programme will achieve this by replacing in-service the current Vanguard Class SSBNs with four Dreadnought Class SSBNs. The programme requirement was detailed in the Government White Paper 2006: The Future of the UK's Nuclear Deterrent; and subsequently endorsed in both the 2015 Strategic Defence and Security Review and the 2021 Integrated Review of Security; Defence; Development and Foreign Policy.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 24 - National security","startDate":"2011-04-14","endDate":null,"scheduleNarrative":"Exempt under Section 24 - National security","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Exempt under Section 43 - Commercial interests","themes":["Commercial & supply chain"],"evidenceExcerpt":"Exempt under Section 24 - National security Exempt under Section 24 - National security","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 24 - National security","narrativeClaimKind":null,"history":[{"id":"MOD_0080_1213-Q1","year":2020,"name":"DREADNOUGHT","department":"MOD","category":"Military Capability","description":"The design, development and manufacture of the Dreadnought ballistic missile submarines.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber, which has not changed since last year�s Q2 1819 Amber, due primarily to the following factors; - The Dreadnought submarine programme remains within budget and on track for the First of Class, HMS Dreadnought, to enter service in the early 2030s. Staged investments have allowed good progress to continue on the whole boat design and the construction process. - Design and construction activity is progressing at pace through Delivery Phase 2, which will run until March 2021. This year has seen further investment in the current phase of the programme when construction work officially started on Valiant, the second in class of Dreadnought submarines. - These investments support new facilities for BAE Systems and the next generation of facilities at Rolls-Royce's Raynesway site; needed to deliver nuclear propulsion power plants for all four Dreadnought submarines. This award will support over 600 highly skilled Rolls-Royce personnel, enabling the company to make further commitments into the supply-chain. Since the Q2 1920 (30th September 2019) Amber IPA DCA, the following primary project actions have impacted the original Q2 IPA DCA; - As reported previously, there have been technical complications with the manufacturing of the missile tubes to be used in the Common Missile Compartment being developed for our 3 submarines and the United States (US) Columbia Class. - Build quality issues on some missile tubes for the Dreadnought Class submarines were identified in 2018. Assessment and repair work continues with the main supplier and their subcontractors, with our world class UK engineers working alongside their US counterparts to achieve the earliest supply of missile tubes into the Dreadnought programme.","startDate":"2011-04-14","endDate":null,"scheduleNarrative":"Exempt under Section 22 of Freedom of Information Act 2000 (Information intended for future publication)","fyBaseline":1613.36,"fyForecast":1613.36,"fyVariance":0.0,"varianceNarrative":"Budget variance less than 5%","wholeLifeCost":30099.34,"costNarrative":"The baseline Whole Life Cost at Q2 1920 (30th September 2019) is �30,099.34 m, has increased by �39.28 m since last year's Q2 1819 (�m) baseline Whole Life Cost of �30,060.07 m, due primarily to the following factors; - The whole life costs figure is for the acquisition of the submarines and associated additional infrastructure, beyond that currently in place for the Vanguard class, and the balance between the current in-service costs and those estimated to support the new boats. - The understanding of the Dreadnought design has matured significantly. Latest cost estimates provide a much more robust view. The programme still forecasts to come within the original estimates. - Over this last period major suppliers have firmed up their costings; this now provides a greater level of certainty in the financial forecast. Since the Q2 1920 (30th September 2019) �30,099.34 m baseline Whole Life Cost, the following primary project actions have impacted the original Q2 baseline Whole Life Cost; - A greater understanding of the technical requirements for the Combat Systems have increased material cost.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Scope & requirements","Technical & integration"],"evidenceExcerpt":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber, which has not changed since last year�s Q2 1819 Amber, due primarily to the following factors; - The Dreadnought submarine programme remains within budget and on track for the First of Class, HMS Dreadnought, to enter service in the early 2030s. Staged…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2020","sourceLabel":"IPA Annual Report 2019-20","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 22 of Freedom of Information Act 2000 (Information intended for future publication)","narrativeClaimKind":null},{"id":"MOD_0080_1213-Q1","year":2021,"name":"Dreadnought","department":"MOD","category":"Military Capability","description":"To deliver a four Boat Dreadnought SSBN Class within the approved performance, cost and time parameters, and contribute to the sustainment of the UK submarine design and manufacturing capability for Dreadnought and beyond. The scope of the programme covers the design, development and manufacture of four Dreadnought SSBN Class submarines, and other costs related to bringing this capability on line, in response to the requirement detailed in the Government White Paper 2006: The Future of the UK's Nuclear Deterrent. The requirement for a class of SSBNs (Dreadnought) to replace the current Vanguard Class was re-endorsed in SDSR 15 and in the 2021 Integrated Review of Security, Defence, Development and Foreign Policy.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber. This is primarily due to the following factors: The Dreadnought submarine programme remains on track for the First of Class, HMS Dreadnought, to enter service in the early 2030s. Staged investments have delivered good progress on the whole boat design, production and supporting infrastructure development. The impact of COVID-19 on Industry Partners, and across the whole supply chain has been proactively managed, aided by improving collaboration and the cultural change being embedded through the new Target Operating Model. Initiatives to improve schedule performance and cost control are in progress.","startDate":"2011-04-14","endDate":null,"scheduleNarrative":"Exempt under Section 24 of the Freedom of Information Act 2000 (National security)","fyBaseline":1850.0,"fyForecast":1850.5,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":31510.78,"costNarrative":"Compared to financial year 19/20-Q2, the projects Baseline Whole Life Cost increased from �30099.34m to �31510.78m. This is primarily due to the following factors: The understanding of the Dreadnought design has matured and the latest cost estimates include a robust and detailed programme scope which, alongside investment in forecasting and cost assurance, has added significantly to the confidence in the projected costs. The programme continues to forecast to come within the �31Bn + �10Bn contingency budget set in 2015, a position validated by independent cost estimation.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Scope & requirements","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber. This is primarily due to the following factors: The Dreadnought submarine programme remains on track for the First of Class, HMS Dreadnought, to enter service in the early 2030s. Staged investments have delivered good progress…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 24 of the Freedom of Information Act 2000 (National security)","narrativeClaimKind":null},{"id":"MOD_0080_1213-Q1","year":2022,"name":"DREADNOUGHT","department":"MOD","category":"Military Capability","description":"To deliver a four Boat Dreadnought SSBN Class within the approved performance, cost and time parameters, and contribute to the sustainment of the UK submarine design and manufacturing capability for Dreadnought and beyond. The scope of the programme covers the design, development and manufacture of four Dreadnought SSBN Class submarines, and other costs related to bringing this capability on line, in response to the requirement detailed in the Government White Paper 2006: The Future of the UK's Nuclear Deterrent. The requirement for a class of SSBNs (Dreadnought) to replace the current Vanguard Class was re-endorsed in SDSR 15 and in the 2021 Integrated Review of Security, Defence, Development and Foreign Policy.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber. This is primarily due to the following factors: The Dreadnought submarine programme remains on track for the First of Class, HMS Dreadnought, to enter service in the early 2030s. Staged investments have delivered good progress on the whole boat design, production and supporting infrastructure development.","startDate":null,"endDate":null,"scheduleNarrative":"Exempt under Section 24 of the Freedom of Information Act 2000.","fyBaseline":242000.0,"fyForecast":242000.0,"fyVariance":242000.0,"varianceNarrative":"Exempt under Section 24 of the Freedom of Information Act 2000.","wholeLifeCost":242000.0,"costNarrative":"Exempt under Section 24 of the Freedom of Information Act 2000.","benefits":null,"benefitsNarrative":"","themes":["Delivery & schedule","Cost & funding","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber. This is primarily due to the following factors: The Dreadnought submarine programme remains on track for the First of Class, HMS Dreadnought, to enter service in the early 2030s. Staged investments have delivered good progress…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 24 of the Freedom of Information Act 2000.","narrativeClaimKind":null},{"id":"MOD_0080_1213-Q1","year":2023,"name":"DREADNOUGHT","department":"MOD","category":"Military Capability","description":"The Dreadnought Programme will maintain the UK's sovereign ability to deliver a deterrent effect by means of a submarine-launched; inter-continental ballistic missile nuclear weapon capability. The programme will achieve this by replacing in-service the current Vanguard Class SSBNs with four Dreadnought Class SSBNs. The programme requirement was detailed in the Government White Paper 2006: The Future of the UK's Nuclear Deterrent; and subsequently endorsed in both the 2015 Strategic Defence and Security Review and the 2021 Integrated Review of Security; Defence; Development and Foreign Policy.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. The Dreadnought submarine programme remains on track for the First of Class HMS Dreadnought to enter service in the early 2030s. Staged investments have delivered good progress on the whole boat design, production and supporting infrastructure development. However it should be recognised for a programme of this compexity, scale and duration, there is real risk, not least from interfacing programmes of work, and it is therefore prudent to assess as Amber in Delivery Confidence.","startDate":"2011-04-14","endDate":null,"scheduleNarrative":"Exempt under Section 24 of the Freedom of Information Act 2000 (National security)","fyBaseline":2488.82,"fyForecast":2535.5,"fyVariance":2.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":33989.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 22/23-Q4 is 33989m. This is primarily due to the following factors. The Dreadnought programme remains on track to deliver to schedule and within the original 31 billion plus 10 billion contingency budget made in the Strategic Defence and Security Review 2015.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This programme does not report cashable benefits. Its aim is to provision the armed forces with the equipment and / or infrastructure required.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. The Dreadnought submarine programme remains on track for the First of Class HMS Dreadnought to enter service in the early 2030s. Staged investments have delivered…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 24 of the Freedom of Information Act 2000 (National security)","narrativeClaimKind":null},{"id":"MOD_0080_1213-Q1","year":2024,"name":"DREADNOUGHT","department":"MOD","category":"Military Capability","description":"The Dreadnought Programme will maintain the UK's sovereign ability to deliver a deterrent effect by means of a submarine-launched, inter-continental ballistic missile nuclear weapon capability. The programme will achieve this by replacing in-service the current Vanguard Class SSBNs with four Dreadnought Class SSBNs. The programme requirement was detailed in the Government White Paper 2006. The Future of the UK's Nuclear Deterrent, and subsequently endorsed in both the 2015 Strategic Defence and Security Review and the 2021 Integrated Review of Security, Defence, Development and Foreign Policy.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure and Projects Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The Dreadnought submarine programme remains on track for the First of Class HMS Dreadnought to enter service in the early 2030s. Staged investments have delivered good progress on the whole boat design, production and supporting infrastructure development. However it should be recognised for a programme of this complexity, scale and duration, there is real risk, not least from interfacing programmes of work, and it is therefore appropriate to assess as Amber in Delivery Confidence.","startDate":"2011-04-14","endDate":null,"scheduleNarrative":"The Dreadnought submarine programme remains on track for the first of Class, HMS Dreadnought, to enter service in the early 2030s.","fyBaseline":2552.81,"fyForecast":2676.7,"fyVariance":4.853,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":36706.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 increased from 33989m to 36706m. This is primarily due to the following factors. Inflation costs increases.","benefits":0.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 0m.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure and Projects Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The Dreadnought submarine programme remains on track for the First of Class HMS Dreadnought to enter service in the early 2030s. Staged investments have…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The Dreadnought submarine programme remains on track for the first of Class, HMS Dreadnought, to enter service in the early 2030s.","narrativeClaimKind":null},{"id":"MOD_0080_1213-Q1","year":2025,"name":"DREADNOUGHT","department":"MoD","category":"Military Capability","description":"The Dreadnought Programme will maintain the UK's sovereign ability to deliver a deterrent effect by means of a submarine-launched, inter-continental ballistic missile nuclear weapon capability. The programme will achieve this by replacing in-service the current Vanguard Class submarines with four Dreadnought Class submarines. The programme requirement was detailed in the Government White Paper 2006: The Future of the UK's Nuclear Deterrent, and subsequently endorsed in both the 2015 Strategic Defence and Security Review and the 2021 Integrated Review of Security, Defence, Development and Foreign Policy.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Section 24 - National security, Section 26 - Defence","startDate":"2011-04-14","endDate":null,"scheduleNarrative":"Section 24 - National security, Section 26 - Defence","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 24 - National security, Section 26 - Defence","wholeLifeCost":null,"costNarrative":"Section 24 - National security, Section 26 - Defence","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits","themes":[],"evidenceExcerpt":"Section 24 - National security, Section 26 - Defence Section 24 - National security, Section 26 - Defence","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Section 24 - National security, Section 26 - Defence","narrativeClaimKind":null},{"id":"MOD_0080_1213-Q1","year":2026,"name":"DREADNOUGHT","department":"MOD","category":"Military Capability","description":"The Dreadnought Programme will maintain the UK's sovereign ability to deliver a deterrent effect by means of a submarine-launched; inter-continental ballistic missile nuclear weapon capability. The programme will achieve this by replacing in-service the current Vanguard Class SSBNs with four Dreadnought Class SSBNs. The programme requirement was detailed in the Government White Paper 2006: The Future of the UK's Nuclear Deterrent; and subsequently endorsed in both the 2015 Strategic Defence and Security Review and the 2021 Integrated Review of Security; Defence; Development and Foreign Policy.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 24 - National security","startDate":"2011-04-14","endDate":null,"scheduleNarrative":"Exempt under Section 24 - National security","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Exempt under Section 43 - Commercial interests","themes":["Commercial & supply chain"],"evidenceExcerpt":"Exempt under Section 24 - National security Exempt under Section 24 - National security","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 24 - National security","narrativeClaimKind":null}],"previous":{"id":"MOD_0080_1213-Q1","year":2025,"name":"DREADNOUGHT","department":"MoD","category":"Military Capability","description":"The Dreadnought Programme will maintain the UK's sovereign ability to deliver a deterrent effect by means of a submarine-launched, inter-continental ballistic missile nuclear weapon capability. The programme will achieve this by replacing in-service the current Vanguard Class submarines with four Dreadnought Class submarines. The programme requirement was detailed in the Government White Paper 2006: The Future of the UK's Nuclear Deterrent, and subsequently endorsed in both the 2015 Strategic Defence and Security Review and the 2021 Integrated Review of Security, Defence, Development and Foreign Policy.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Section 24 - National security, Section 26 - Defence","startDate":"2011-04-14","endDate":null,"scheduleNarrative":"Section 24 - National security, Section 26 - Defence","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 24 - National security, Section 26 - Defence","wholeLifeCost":null,"costNarrative":"Section 24 - National security, Section 26 - Defence","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits","themes":[],"evidenceExcerpt":"Section 24 - National security, Section 26 - Defence Section 24 - National security, Section 26 - Defence","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Section 24 - National security, Section 26 - Defence","narrativeClaimKind":null},"ratingDelta":null,"transition":"Not comparable","endDateDeltaDays":null,"attentionScore":14,"attentionReasons":["In-year forecast variance is +43.0%"]},{"id":"DESNZ_0458_2425-Q3","year":2026,"name":"East Coast Cluster (ECC)","department":"DESNZ","category":"Infrastructure and Construction","description":"Overall, the CCUS programme will deliver a suite of business models and agreed revenue support ranges. These will underpin future private sector and Government investment in CCUS infrastructure (Power, Transport and Storage, Industry, and Hydrogen). This also includes the delivery of legal and regulatory frameworks to set risk/return profiles, rules, and guidance in relation to the use of Transport and Storage systems, industry and power capture, pBECCS and hydrogen. The East Coast Cluster (ECC) Anchor Project comprises the initial CCUS Transport and Storage Company (Northern Endurance Partnership) and the first capture project (Net Zero Teesside), which will establish an operational CCUS cluster in the North East of England. The anchor project is expected to be followed by a series of build out projects. These will be crucial to the creation of a competitive CCUS market, supporting the UK's drive to legally binding Net Zero targets, and delivering economic benefits.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 43 - Commercial interests","startDate":"2020-04-01","endDate":null,"scheduleNarrative":"Exempt under Section 43 - Commercial interests","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Exempt under Section 43 - Commercial interests","themes":["Commercial & supply chain"],"evidenceExcerpt":"Exempt under Section 43 - Commercial interests Exempt under Section 43 - Commercial interests","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 43 - Commercial interests","narrativeClaimKind":null,"history":[{"id":"DESNZ_0458_2425-Q3","year":2025,"name":"East Coast Cluster Anchor (ECC)","department":"DESNZ","category":"Infrastructure and Construction","description":"Overall, the CCUS programme will deliver a suite of business models and agreed revenue support ranges. These will underpin future private sector and Government investment in CCUS infrastructure (Power, Transport and Storage, Industry, and Hydrogen). This also includes the delivery of legal and regulatory frameworks to set risk/return profiles, rules, and guidance in relation to the use of Transport and Storage systems, industry and power capture, pBECCS and hydrogen. The East Coast Cluster (ECC) Anchor Project comprises the initial CCUS Transport and Storage Company (Northern Endurance Partnership) and one emitter project (Net Zero Teeside) for one operational industrial CCUS cluster in the North East of England. It is planned that the anchor project will be followed by a series of Build Out projects. These will be crucial to the creation of a competitive CCUS market, supporting the UK's drive to legally binding Net Zero targets, and delivering economic benefits.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Section 43 - Commercial interests","startDate":null,"endDate":null,"scheduleNarrative":"Section 43 - Commercial interests","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 43 - Commercial interests","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Section 43 - Commercial interests","themes":["Commercial & supply chain"],"evidenceExcerpt":"Section 43 - Commercial interests Section 43 - Commercial interests","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Section 43 - Commercial interests","narrativeClaimKind":null},{"id":"DESNZ_0458_2425-Q3","year":2026,"name":"East Coast Cluster (ECC)","department":"DESNZ","category":"Infrastructure and Construction","description":"Overall, the CCUS programme will deliver a suite of business models and agreed revenue support ranges. These will underpin future private sector and Government investment in CCUS infrastructure (Power, Transport and Storage, Industry, and Hydrogen). This also includes the delivery of legal and regulatory frameworks to set risk/return profiles, rules, and guidance in relation to the use of Transport and Storage systems, industry and power capture, pBECCS and hydrogen. The East Coast Cluster (ECC) Anchor Project comprises the initial CCUS Transport and Storage Company (Northern Endurance Partnership) and the first capture project (Net Zero Teesside), which will establish an operational CCUS cluster in the North East of England. The anchor project is expected to be followed by a series of build out projects. These will be crucial to the creation of a competitive CCUS market, supporting the UK's drive to legally binding Net Zero targets, and delivering economic benefits.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 43 - Commercial interests","startDate":"2020-04-01","endDate":null,"scheduleNarrative":"Exempt under Section 43 - Commercial interests","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Exempt under Section 43 - Commercial interests","themes":["Commercial & supply chain"],"evidenceExcerpt":"Exempt under Section 43 - Commercial interests Exempt under Section 43 - Commercial interests","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 43 - Commercial interests","narrativeClaimKind":null}],"previous":{"id":"DESNZ_0458_2425-Q3","year":2025,"name":"East Coast Cluster Anchor (ECC)","department":"DESNZ","category":"Infrastructure and Construction","description":"Overall, the CCUS programme will deliver a suite of business models and agreed revenue support ranges. These will underpin future private sector and Government investment in CCUS infrastructure (Power, Transport and Storage, Industry, and Hydrogen). This also includes the delivery of legal and regulatory frameworks to set risk/return profiles, rules, and guidance in relation to the use of Transport and Storage systems, industry and power capture, pBECCS and hydrogen. The East Coast Cluster (ECC) Anchor Project comprises the initial CCUS Transport and Storage Company (Northern Endurance Partnership) and one emitter project (Net Zero Teeside) for one operational industrial CCUS cluster in the North East of England. It is planned that the anchor project will be followed by a series of Build Out projects. These will be crucial to the creation of a competitive CCUS market, supporting the UK's drive to legally binding Net Zero targets, and delivering economic benefits.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Section 43 - Commercial interests","startDate":null,"endDate":null,"scheduleNarrative":"Section 43 - Commercial interests","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 43 - Commercial interests","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Section 43 - Commercial interests","themes":["Commercial & supply chain"],"evidenceExcerpt":"Section 43 - Commercial interests Section 43 - Commercial interests","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Section 43 - Commercial interests","narrativeClaimKind":null},"ratingDelta":null,"transition":"Not comparable","endDateDeltaDays":null,"attentionScore":14,"attentionReasons":["In-year forecast variance is +43.0%"]},{"id":"CO_0027_2021-Q4","year":2026,"name":"Future Service Programme","department":"CO","category":"Information and Communications Technology (ICT)","description":"Exempt under Section 43 - Commercial interests","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 43 - Commercial interests","startDate":"2020-10-01","endDate":"2026-12-31","scheduleNarrative":"Exempt under Section 43 - Commercial interests","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Exempt under Section 43 - Commercial interests","themes":["Commercial & supply chain"],"evidenceExcerpt":"Exempt under Section 43 - Commercial interests Exempt under Section 43 - Commercial interests","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 43 - Commercial interests","narrativeClaimKind":null,"history":[{"id":"CO_0027_2021-Q4","year":2022,"name":"Future Service Programme","department":"CO","category":"Government Transformation and Service Delivery","description":"The purpose of the programme is to put in place new administration models for the Civil Service Pension Scheme and the Royal Mail Statutory Pension Scheme. The new models will enable Ministers to meet their statutory duties to administer these schemes and will provide continuity of service to the two million scheme members. The strategic vision is to 'transform the Civil Service Pension Scheme into the best managed and administered UK public service pension scheme'.","ipaDca":"Green","sroDca":null,"deliveryConfidence":"Green","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 is Green The Programme is closely monitoring ongoing developments and will take appropriate action as needed. We are closely monitoring and will respond to any IPA feedback; and take action as needed.","startDate":"2020-10-01","endDate":"2024-12-31","scheduleNarrative":"Your project end-date is 31 DEC 2024. This is primarily due to the following factors: The programme is now fully in procurement. Progress includes the publishing of the SQ document and Contract Notice. As we have now fully entered procurement we are proactively focusing on planning our internal evaluation sessions, agreeing the evaluation criteria to be able to score evaluate and moderate potential bidders successfully and fairly. In parallel with this the programme is focusing on finalising service requirements and model services contract. Focus is currently on CSPS product however, initial activities have commenced in the RMSPS given the longer timescales for RMSPS ITT. For all key exercises the programme has initiated professional training for areas such as evaluation criteria, scoring mechanisms, TUPE and negotiation to ensure we have the correct knowledge to undertake the activities. In addition to this we are focusing on the next stage of planning around aligning key dependencies against the programme which may be impacted by transition and down selecting.","fyBaseline":1.6,"fyForecast":0.9,"fyVariance":-44.0,"varianceNarrative":"OBC has now received COAB approval. spend is down 44% from initial forecast following significant project work pushed forward into next year.","wholeLifeCost":243.0,"costNarrative":"Your projects Baseline Whole Life Cost is 243.20 (£m). This is primarily due to the following factors: The whole life cost remains the same as we are expecting the necessary project work planned for 21-22 to be carried forward into 22-23.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 is Green The Programme is closely monitoring ongoing developments and will take appropriate action as needed. We are closely monitoring and will respond to any IPA feedback; and take action as needed. Your project end-date is 31 DEC 2024. This is primarily due to the…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Your project end-date is 31 DEC 2024. This is primarily due to the following factors: The programme is now fully in procurement. Progress includes the publishing of the SQ document and Contract Notice. As we have now fully entered procurement we are proactively focusing on planning our internal evaluation sessions, agreeing the evaluation criteria to be able to score evaluate and moderate potential bidders successfully and fairly. In parallel with this the programme is focusing on finalising service requirements and model services contract. Focus is currently on CSPS product however, initial activities have commenced in the RMSPS given the longer timescales for RMSPS ITT. For all key exercises the programme has initiated professional training for areas such as evaluation criteria, scoring mechanisms, TUPE and negotiation to ensure we have the correct knowledge to undertake the activities. In addition to this we are focusing on the next stage of planning around aligning key dependencies against the programme which may be impacted by transition and down selecting.","narrativeClaimKind":null},{"id":"CO_0027_2021-Q4","year":2023,"name":"Future Service Programme","department":"CO","category":"Government Transformation and Service Delivery","description":"Future Services Programme is a series of procurement and transformation projects within the Pension directorate of GPG. Key projects within the programme include The Civil Service Pension Scheme (CSPS) and the Royal Mail Statutory Pension Scheme (RMSPS). Ministers have a legal requirement to deliver administration services for the CSPS. MyCSP Ltd currently administers the CSPS under a contract with the Cabinet Office that will expire on 31 December 2023, although transitional protection clauses in the contract means that the current service can continue until December 2025. RMSPS services expires in September 2023 however a year long extension has been although transitional protection clauses in the contract means that the current service can continue for 2 years.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 decreased from Green (IPA rating) to Amber (SRO rating). This is primarily due to the following factors. Awaiting outcome of Gate 3 Review","startDate":"2020-10-01","endDate":"2025-12-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 increased from 2024-12-31 to 2025-12-31. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2024-12-31. This is primarily due to the following factors. Prject schedule has slipped due to extended time required on negotiations for CSPS","fyBaseline":1.6,"fyForecast":1.7,"fyVariance":6.0,"varianceNarrative":"Data already completed on GMPP","wholeLifeCost":null,"costNarrative":"NA The project did not provide data","benefits":11.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 11m. Benefits have been defined as part of the OBC and FBC which will be deleivered during transition. The final business case has been worked on and submitted to COAB for the July board part of which work will be done to revisit benefits identified within the early cost modelling stage to establish whether they are still relevant.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Technical & integration"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 decreased from Green (IPA rating) to Amber (SRO rating). This is primarily due to the following factors. Awaiting outcome of Gate 3 Review Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 increased from 2024-12-31 to 2025-12-31. This is…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 increased from 2024-12-31 to 2025-12-31. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2024-12-31. This is primarily due to the following factors. Prject schedule has slipped due to extended time required on negotiations for CSPS","narrativeClaimKind":null},{"id":"CO_0027_2021-Q4","year":2024,"name":"Future Service Programme","department":"CO","category":"Government Transformation and Service Delivery","description":"End of Year position - CSPS contract awarded 17/11/23. Transition commenced 08/12/23. RMSPS - going through approvals process. Contract expected to be awarded end of May 2024.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. Findings from the IPA Gate review (June 2023) surrounded programme resourcing. Including the continuity of the Programme Director, recruiting an Exit Manager to support exit of the incumbent supplier for the CS Pensions Scheme and implementation of succession planning. The programme has since secured the incumbent Programme Director until October 2025. An appointment was made for the Exit Manager but resigned a few days after their start date. Contingent Labour is being pursued to fulfil this role. On succession planning the Programme team is working with the wider Pension Directorate to develop a new Target Operating Model to support the ongoing delivery of the contract, including the definition of the capability requirement of staff and detailed plans on how to achieve this. A component of this model will be a detailed succession plan, utilising the capability model to identify talent and ensure processes are in place to develop these individuals.","startDate":"2020-10-01","endDate":"2024-12-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 decreased from 2025-12-31 to 2024-12-31. This is primarily due to the following factors. N/A","fyBaseline":6.4,"fyForecast":1.6,"fyVariance":-75.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The GMPP project did not provide narrative","wholeLifeCost":239.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 23/24-Q4 is 239m. This is primarily due to the following factors.","benefits":11.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 11m. Benefits identified at the OBC stage have been assessed and deemed to still be relevant. The potential cost savings are based upon the current contract costs and services performance, and present the potential opportunity to realise 82,585,174 over the life of the contract. However they will not be realised until Service Commencement, after the Transition has been completed. The establishment of the benefits realisation process will be a core part of transition activities. The Authority will work with Capita to develop and implement the detailed benefits delivery plan. This will include accurate baselines of the identified benefits, proposed targets and a supporting a delivery profile. Appropriate governance will be established within the Cabinet Office, including the utilisation of Gate 4 and Gate 5 IPA reviews to effectively monitor the delivery of benefits, and use appropriate levers within the contract to hold suppliers to account where this falls short. A key enabler to realising these benefits is the development of a Target Operating Model for the Authority which will define the operating structure and develop the capability to become a truly Intelligent Client. For maximum success this new TOM needs to be fully operational on Service Commencement date in Sept 2025","themes":["Cost & funding","Workforce & capability","Commercial & supply chain","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. Findings from the IPA Gate review (June 2023) surrounded programme resourcing. Including the continuity of the Programme Director, recruiting an Exit Manager to support exit…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 decreased from 2025-12-31 to 2024-12-31. This is primarily due to the following factors. N/A","narrativeClaimKind":null},{"id":"CO_0027_2021-Q4","year":2025,"name":"Future Service Programme","department":"CO","category":"ICT","description":"The purpose of the programme is to put in place new administration models for the Civil Service Pension Scheme and the Royal Mail Statutory Pension Scheme. The new models will enable Ministers to meet their statutory duties to administer these schemes and will provide continuity of service to the two million scheme members. The strategic vision is to 'transform the Civil Service Pension Scheme into the best managed and administered UK public service pension scheme","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ There are still significant challenges that the programme is addressing to ensure a successful transition CSPS Pensions Administration of services from MyCSP to Capita in December 2025. The contract with Capita was signed on the 17th November 2023 and the two year transition commenced on 8th December 2023. To ensure that the Cabinet Office was able to maximise the success of the complex transition of Services, a schedule of 12 Transition Milestones, each with defined deliverables and timescales, was negotiated and embedded within the Contract in Schedule 6.1 Transition Plan. Each Transition Milestone has payments associated with it which is documented in Schedule 7.1: Charges and Invoicing . Of the 6 Transition Milestones that Capita should have delivered by May 2025, 3 were late: - TM 4 was delivered 3rd June 2025 (original schedule date 30 Sept 24) - TM 6 was delivered 3rd June 2025 (original schedule date 31st April 24) - TM 5 is still to be delivered and the date is tbc (original schedule date 31st December 24) TM5 continues to be delayed due to some of the calculations not being on track for automation, as per the contractual requirements. Capita have provide Cabinet office with the detailed assessment of which Work Package 4 & 5 calculations will be run manually between December 2025 and March 2026, as well as providing CO with a details summary of the Scope of Day 1 (December 25) and Day 2 (March 26) delivery. Both of these products are being reviewed by Cabinet Office to ensure that there is no visible impact to Employers or members, and are scrutinising Capita resource plans to ensure that they have an appropriate level of FTEs to run the service with manual calculations for a short period of time. Furthermore due to internal delays within Capita's internal programme which is developing the core generic functionality for the Pension Administration Solution, CSPS will be adopting an duel release approach. The 1st release of functionality on 01/12/25 will ensure that we can move from MyCSP with a fully functional service. The 2nd release, scheduled for March 26, will delivery the remaining functionality which will meet the full contractual requirements. This effectively extends the transition by 3 months. However, Capital will begin running the CSPS service from 01/12/25 and will be required to adhere to all KPI and SLs outlined in Schedule 2.2 of the contract. The Cabinet office Programme Team are working closely with colleagues within the Markets Suppliers Team, Technical Design Authority and Security teams to ensure that, despite delays on some functionality, that implementation is technical sounds and secures the sensitive data set and retains significant commercial leverage over Capita to ensure that contract requirements are fulfilled. To ensure that The Programme is prepared for all eventualities, work on contingency options is underway, should there be any Red Lines (as defined by the Cabinet Office Minimum Viable Product) breached by Capita's delivery. All contingencies would be at the cost of Capita, as a liability clause up to the value of £60 million for failure to deliver transition within the 2 year window was negotiated into the contract.","startDate":"2020-10-01","endDate":null,"scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/12/2024 to 30/09/2026. This is primarily due to the following factors‚ The delivery schedule for CSPS Pensions Administration transfer is driven by the contractual obligations of the incoming supplier to delivery transition within a 2 year window. This window ends on 8th December 2025. Furthermore the Termination Assistance Period with the incumbent supplier, MyCSP comes to an end on 31st December 2025. Due to internal delays within Capita's internal programme which is developing the core generic functionality for the Pension Administration Solution, CSPS will be adopting an duel release approach. The 1st release of functionality on 01/12/25 will ensure that we can move from MyCSP with a fully functional service, which is prior to the end of the Termination Assistance Period. The 2nd release, scheduled for March 26, will delivery the remaining functionality which will meet the full contractual requirements. This effectively extends the transition by 3 months. However, Capital will begin running the CSPS service from 01/12/25 and will be required to adhere to all KPI and SLs outlined in Schedule 2.2 of the contract.","fyBaseline":21.5,"fyForecast":21.5,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%. Programme remains within budget variance as the contracts being delivered are a fixed price (including transition).","wholeLifeCost":239.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 239. This is primarily due to the following factors‚ Baseline Whole life cost for the programme Programme remains the same as the contracts being delivered are a fixed price (including transition).","benefits":11.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 11. This is primarily due to the following factors‚ Benefits Realisation Process is being designed and delivered as part of Transition. Benefits will be tracked once the Programme hands over to Service Commencement. Baselined Benefits as per the FBC remain the same.","themes":["Delivery & schedule","Cost & funding","Commercial & supply chain","Technical & integration"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ There are still significant challenges that the programme is addressing to ensure a successful transition CSPS Pensions Administration of services from MyCSP to…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/12/2024 to 30/09/2026. This is primarily due to the following factors‚ The delivery schedule for CSPS Pensions Administration transfer is driven by the contractual obligations of the incoming supplier to delivery transition within a 2 year window. This window ends on 8th December 2025. Furthermore the Termination Assistance Period with the incumbent supplier, MyCSP comes to an end on 31st December 2025. Due to internal delays within Capita's internal programme which is developing the core generic functionality for the Pension Administration Solution, CSPS will be adopting an duel release approach. The 1st release of functionality on 01/12/25 will ensure that we can move from MyCSP with a fully functional service, which is prior to the end of the Termination Assistance Period. The 2nd release, scheduled for March 26, will delivery the remaining functionality which will meet the full contractual requirements. This effectively extends the transition by 3 months. However, Capital will begin running the CSPS service from 01/12/25 and will be required to adhere to all KPI and SLs outlined in Schedule 2.2 of the contract.","narrativeClaimKind":null},{"id":"CO_0027_2021-Q4","year":2026,"name":"Future Service Programme","department":"CO","category":"Information and Communications Technology (ICT)","description":"Exempt under Section 43 - Commercial interests","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 43 - Commercial interests","startDate":"2020-10-01","endDate":"2026-12-31","scheduleNarrative":"Exempt under Section 43 - Commercial interests","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Exempt under Section 43 - Commercial interests","themes":["Commercial & supply chain"],"evidenceExcerpt":"Exempt under Section 43 - Commercial interests Exempt under Section 43 - Commercial interests","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 43 - Commercial interests","narrativeClaimKind":null}],"previous":{"id":"CO_0027_2021-Q4","year":2025,"name":"Future Service Programme","department":"CO","category":"ICT","description":"The purpose of the programme is to put in place new administration models for the Civil Service Pension Scheme and the Royal Mail Statutory Pension Scheme. The new models will enable Ministers to meet their statutory duties to administer these schemes and will provide continuity of service to the two million scheme members. The strategic vision is to 'transform the Civil Service Pension Scheme into the best managed and administered UK public service pension scheme","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ There are still significant challenges that the programme is addressing to ensure a successful transition CSPS Pensions Administration of services from MyCSP to Capita in December 2025. The contract with Capita was signed on the 17th November 2023 and the two year transition commenced on 8th December 2023. To ensure that the Cabinet Office was able to maximise the success of the complex transition of Services, a schedule of 12 Transition Milestones, each with defined deliverables and timescales, was negotiated and embedded within the Contract in Schedule 6.1 Transition Plan. Each Transition Milestone has payments associated with it which is documented in Schedule 7.1: Charges and Invoicing . Of the 6 Transition Milestones that Capita should have delivered by May 2025, 3 were late: - TM 4 was delivered 3rd June 2025 (original schedule date 30 Sept 24) - TM 6 was delivered 3rd June 2025 (original schedule date 31st April 24) - TM 5 is still to be delivered and the date is tbc (original schedule date 31st December 24) TM5 continues to be delayed due to some of the calculations not being on track for automation, as per the contractual requirements. Capita have provide Cabinet office with the detailed assessment of which Work Package 4 & 5 calculations will be run manually between December 2025 and March 2026, as well as providing CO with a details summary of the Scope of Day 1 (December 25) and Day 2 (March 26) delivery. Both of these products are being reviewed by Cabinet Office to ensure that there is no visible impact to Employers or members, and are scrutinising Capita resource plans to ensure that they have an appropriate level of FTEs to run the service with manual calculations for a short period of time. Furthermore due to internal delays within Capita's internal programme which is developing the core generic functionality for the Pension Administration Solution, CSPS will be adopting an duel release approach. The 1st release of functionality on 01/12/25 will ensure that we can move from MyCSP with a fully functional service. The 2nd release, scheduled for March 26, will delivery the remaining functionality which will meet the full contractual requirements. This effectively extends the transition by 3 months. However, Capital will begin running the CSPS service from 01/12/25 and will be required to adhere to all KPI and SLs outlined in Schedule 2.2 of the contract. The Cabinet office Programme Team are working closely with colleagues within the Markets Suppliers Team, Technical Design Authority and Security teams to ensure that, despite delays on some functionality, that implementation is technical sounds and secures the sensitive data set and retains significant commercial leverage over Capita to ensure that contract requirements are fulfilled. To ensure that The Programme is prepared for all eventualities, work on contingency options is underway, should there be any Red Lines (as defined by the Cabinet Office Minimum Viable Product) breached by Capita's delivery. All contingencies would be at the cost of Capita, as a liability clause up to the value of £60 million for failure to deliver transition within the 2 year window was negotiated into the contract.","startDate":"2020-10-01","endDate":null,"scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/12/2024 to 30/09/2026. This is primarily due to the following factors‚ The delivery schedule for CSPS Pensions Administration transfer is driven by the contractual obligations of the incoming supplier to delivery transition within a 2 year window. This window ends on 8th December 2025. Furthermore the Termination Assistance Period with the incumbent supplier, MyCSP comes to an end on 31st December 2025. Due to internal delays within Capita's internal programme which is developing the core generic functionality for the Pension Administration Solution, CSPS will be adopting an duel release approach. The 1st release of functionality on 01/12/25 will ensure that we can move from MyCSP with a fully functional service, which is prior to the end of the Termination Assistance Period. The 2nd release, scheduled for March 26, will delivery the remaining functionality which will meet the full contractual requirements. This effectively extends the transition by 3 months. However, Capital will begin running the CSPS service from 01/12/25 and will be required to adhere to all KPI and SLs outlined in Schedule 2.2 of the contract.","fyBaseline":21.5,"fyForecast":21.5,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%. Programme remains within budget variance as the contracts being delivered are a fixed price (including transition).","wholeLifeCost":239.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 239. This is primarily due to the following factors‚ Baseline Whole life cost for the programme Programme remains the same as the contracts being delivered are a fixed price (including transition).","benefits":11.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 11. This is primarily due to the following factors‚ Benefits Realisation Process is being designed and delivered as part of Transition. Benefits will be tracked once the Programme hands over to Service Commencement. Baselined Benefits as per the FBC remain the same.","themes":["Delivery & schedule","Cost & funding","Commercial & supply chain","Technical & integration"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ There are still significant challenges that the programme is addressing to ensure a successful transition CSPS Pensions Administration of services from MyCSP to…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/12/2024 to 30/09/2026. This is primarily due to the following factors‚ The delivery schedule for CSPS Pensions Administration transfer is driven by the contractual obligations of the incoming supplier to delivery transition within a 2 year window. This window ends on 8th December 2025. Furthermore the Termination Assistance Period with the incumbent supplier, MyCSP comes to an end on 31st December 2025. Due to internal delays within Capita's internal programme which is developing the core generic functionality for the Pension Administration Solution, CSPS will be adopting an duel release approach. The 1st release of functionality on 01/12/25 will ensure that we can move from MyCSP with a fully functional service, which is prior to the end of the Termination Assistance Period. The 2nd release, scheduled for March 26, will delivery the remaining functionality which will meet the full contractual requirements. This effectively extends the transition by 3 months. However, Capital will begin running the CSPS service from 01/12/25 and will be required to adhere to all KPI and SLs outlined in Schedule 2.2 of the contract.","narrativeClaimKind":null},"ratingDelta":null,"transition":"Not comparable","endDateDeltaDays":null,"attentionScore":14,"attentionReasons":["In-year forecast variance is +43.0%"]},{"id":"BEIS_0233_2223-Q4","year":2026,"name":"GBE-N SMR Programme","department":"DESNZ","category":"Infrastructure and Construction","description":"The Small Modular Reactor (SMR) Programme is a major UK infrastructure initiative led by Great British Energy – Nuclear (GBE-N), established in 2023. It aims to develop and deploy a new fleet of small nuclear reactors to support energy security, provide reliable low-carbon electricity, and contribute to the UK’s transition to net zero. In June 2025, Rolls-Royce SMR was selected as the Preferred Bidder. Work on design, licensing and site development is underway this decade, with the first reactors expected to be operational in the mid-to-late 2030s. The programme focuses on selecting the right technology and securing suitable sites. GBE-N owns Oldbury and Wylfa, with Wylfa selected in November 2025, and is building the delivery capability needed to bring projects forward.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 43 - Commercial interests","startDate":null,"endDate":null,"scheduleNarrative":"Exempt under Section 43 - Commercial interests","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Exempt under Section 43 - Commercial interests","themes":["Commercial & supply chain"],"evidenceExcerpt":"Exempt under Section 43 - Commercial interests Exempt under Section 43 - Commercial interests","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 43 - Commercial interests","narrativeClaimKind":null,"history":[{"id":"BEIS_0233_2223-Q4","year":2024,"name":"Great British Nuclear","department":"DESNZ","category":"Infrastructure and Construction","description":"Great British Nuclear (GBN) was set-up as HMG's new nuclear delivery body. GBN's first mandate is to take forward the SMR programme, launched in July 2023. The PBC is forecast to be approved in 2024. The SMR Programme is building block to support the wider nuclear programme - up to 24GW by 2050. The first phase of the SMR Programme focuses on enabling projects, which will be initiated through the following workstreams; Technology Selection: To run a competitive tender and down select to one or more potential technology partners - OBC approved in Feb 2024. Siting: To identify and secure access to sites for the allocation of selected technologies. SMR Programme Development: To set up GBN as an intelligent customer to oversee the management and delivery of the SMR Programme, including procurement and establishment of Devcos.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","startDate":"2023-07-01","endDate":"2029-12-21","scheduleNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","themes":["Commercial & supply chain"],"evidenceExcerpt":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests. Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","narrativeClaimKind":null},{"id":"BEIS_0233_2223-Q4","year":2025,"name":"GREAT BRITISH NUCLEAR","department":"DESNZ","category":"Infrastructure and Construction","description":"Great British Nuclear (GBN) was set-up as HMG's new nuclear delivery body. GBN's first mandate is to take forward an SMR technology selection process, launched in July 2023. The SMR Programme seeks to contribute to wider nuclear, and the Government’s, energy security and net zero, goals. The SMR Programme includes the following workstreams: Technology Selection: To run a competitive tender and down select potential technology partner(s) - the selection process is currently in its final stage. Siting: To identify and secure access to sites for the allocation of selected technologies. SMR Programme Development: GBN to act an intelligent client to oversee the management and delivery (subject to funding decisions) of the SMR Programme, including establishment of DevCo capability to deliver project(s).","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Section 43 - Commercial interests","startDate":null,"endDate":null,"scheduleNarrative":"Section 43 - Commercial interests","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 43 - Commercial interests","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests, The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","benefits":null,"benefitsNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","themes":["Commercial & supply chain","Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Section 43 - Commercial interests Section 43 - Commercial interests","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Section 43 - Commercial interests","narrativeClaimKind":null},{"id":"BEIS_0233_2223-Q4","year":2026,"name":"GBE-N SMR Programme","department":"DESNZ","category":"Infrastructure and Construction","description":"The Small Modular Reactor (SMR) Programme is a major UK infrastructure initiative led by Great British Energy – Nuclear (GBE-N), established in 2023. It aims to develop and deploy a new fleet of small nuclear reactors to support energy security, provide reliable low-carbon electricity, and contribute to the UK’s transition to net zero. In June 2025, Rolls-Royce SMR was selected as the Preferred Bidder. Work on design, licensing and site development is underway this decade, with the first reactors expected to be operational in the mid-to-late 2030s. The programme focuses on selecting the right technology and securing suitable sites. GBE-N owns Oldbury and Wylfa, with Wylfa selected in November 2025, and is building the delivery capability needed to bring projects forward.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 43 - Commercial interests","startDate":null,"endDate":null,"scheduleNarrative":"Exempt under Section 43 - Commercial interests","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Exempt under Section 43 - Commercial interests","themes":["Commercial & supply chain"],"evidenceExcerpt":"Exempt under Section 43 - Commercial interests Exempt under Section 43 - Commercial interests","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 43 - Commercial interests","narrativeClaimKind":null}],"previous":{"id":"BEIS_0233_2223-Q4","year":2025,"name":"GREAT BRITISH NUCLEAR","department":"DESNZ","category":"Infrastructure and Construction","description":"Great British Nuclear (GBN) was set-up as HMG's new nuclear delivery body. GBN's first mandate is to take forward an SMR technology selection process, launched in July 2023. The SMR Programme seeks to contribute to wider nuclear, and the Government’s, energy security and net zero, goals. The SMR Programme includes the following workstreams: Technology Selection: To run a competitive tender and down select potential technology partner(s) - the selection process is currently in its final stage. Siting: To identify and secure access to sites for the allocation of selected technologies. SMR Programme Development: GBN to act an intelligent client to oversee the management and delivery (subject to funding decisions) of the SMR Programme, including establishment of DevCo capability to deliver project(s).","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Section 43 - Commercial interests","startDate":null,"endDate":null,"scheduleNarrative":"Section 43 - Commercial interests","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 43 - Commercial interests","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests, The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","benefits":null,"benefitsNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","themes":["Commercial & supply chain","Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Section 43 - Commercial interests Section 43 - Commercial interests","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Section 43 - Commercial interests","narrativeClaimKind":null},"ratingDelta":null,"transition":"Not comparable","endDateDeltaDays":null,"attentionScore":14,"attentionReasons":["In-year forecast variance is +43.0%"]},{"id":"DESNZ_0457_2425-Q3","year":2026,"name":"HyNet Cluster","department":"DESNZ","category":"Infrastructure and Construction","description":"Overall, the CCUS programme will deliver a suite of business models and agreed revenue support ranges. These will underpin future private sector and Government investment in CCUS infrastructure (Power, Transport and Storage, Industry, and Hydrogen). This also includes the delivery of legal and regulatory frameworks to set risk/return profiles, rules, and guidance in relation to the use of Transport and Storage systems, industry and power capture, pBECCS and hydrogen. The HyNet Cluster comprises the Anchor, Padeswood and HyNet Build Out 2 projects, which together support the phased development of an industrial CCUS cluster in the Liverpool Bay area. The Anchor project establishes the core transport and storage infrastructure and initial capture projects, while Padeswood and HyNet Build Out 2 expand network utilisation through additional capture projects. Collectively, these projects support the development of a competitive CCUS market, contribute to the UK’s legally binding Net Zero targets, and deliver wider economic benefits.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 43 - Commercial interests","startDate":"2020-04-01","endDate":null,"scheduleNarrative":"Exempt under Section 43 - Commercial interests","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Exempt under Section 43 - Commercial interests","themes":["Commercial & supply chain"],"evidenceExcerpt":"Exempt under Section 43 - Commercial interests Exempt under Section 43 - Commercial interests","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 43 - Commercial interests","narrativeClaimKind":null,"history":[{"id":"DESNZ_0457_2425-Q3","year":2025,"name":"HyNet Anchor","department":"DESNZ","category":"Infrastructure and Construction","description":"Overall, the CCUS programme will deliver a suite of business models and agreed revenue support ranges. These will underpin future private sector and Government investment in CCUS infrastructure (Power, Transport and Storage, Industry, and Hydrogen). This also includes the delivery of legal and regulatory frameworks to set risk/return profiles, rules, and guidance in relation to the use of Transport and Storage systems, industry and power capture, pBECCS and hydrogen. The HyNet Anchor Project comprises the initial CCUS Transport and Storage Company (ENI) and two emitter projects (Protos and Hydrogen Production Plant 1) for one operational industrial CCUS cluster in the Liverpool Bay area. It is planned that the anchor project will be followed by a series of Build Out projects. These will be crucial to the the creation of a competitive CCUS market, supporting the UK's drive to legally binding Net Zero targets, and delivering economic benefits.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Section 43 - Commercial interests","startDate":null,"endDate":null,"scheduleNarrative":"Section 43 - Commercial interests","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 43 - Commercial interests","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Section 43 - Commercial interests","themes":["Commercial & supply chain"],"evidenceExcerpt":"Section 43 - Commercial interests Section 43 - Commercial interests","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Section 43 - Commercial interests","narrativeClaimKind":null},{"id":"DESNZ_0457_2425-Q3","year":2026,"name":"HyNet Cluster","department":"DESNZ","category":"Infrastructure and Construction","description":"Overall, the CCUS programme will deliver a suite of business models and agreed revenue support ranges. These will underpin future private sector and Government investment in CCUS infrastructure (Power, Transport and Storage, Industry, and Hydrogen). This also includes the delivery of legal and regulatory frameworks to set risk/return profiles, rules, and guidance in relation to the use of Transport and Storage systems, industry and power capture, pBECCS and hydrogen. The HyNet Cluster comprises the Anchor, Padeswood and HyNet Build Out 2 projects, which together support the phased development of an industrial CCUS cluster in the Liverpool Bay area. The Anchor project establishes the core transport and storage infrastructure and initial capture projects, while Padeswood and HyNet Build Out 2 expand network utilisation through additional capture projects. Collectively, these projects support the development of a competitive CCUS market, contribute to the UK’s legally binding Net Zero targets, and deliver wider economic benefits.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 43 - Commercial interests","startDate":"2020-04-01","endDate":null,"scheduleNarrative":"Exempt under Section 43 - Commercial interests","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Exempt under Section 43 - Commercial interests","themes":["Commercial & supply chain"],"evidenceExcerpt":"Exempt under Section 43 - Commercial interests Exempt under Section 43 - Commercial interests","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 43 - Commercial interests","narrativeClaimKind":null}],"previous":{"id":"DESNZ_0457_2425-Q3","year":2025,"name":"HyNet Anchor","department":"DESNZ","category":"Infrastructure and Construction","description":"Overall, the CCUS programme will deliver a suite of business models and agreed revenue support ranges. These will underpin future private sector and Government investment in CCUS infrastructure (Power, Transport and Storage, Industry, and Hydrogen). This also includes the delivery of legal and regulatory frameworks to set risk/return profiles, rules, and guidance in relation to the use of Transport and Storage systems, industry and power capture, pBECCS and hydrogen. The HyNet Anchor Project comprises the initial CCUS Transport and Storage Company (ENI) and two emitter projects (Protos and Hydrogen Production Plant 1) for one operational industrial CCUS cluster in the Liverpool Bay area. It is planned that the anchor project will be followed by a series of Build Out projects. These will be crucial to the the creation of a competitive CCUS market, supporting the UK's drive to legally binding Net Zero targets, and delivering economic benefits.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Section 43 - Commercial interests","startDate":null,"endDate":null,"scheduleNarrative":"Section 43 - Commercial interests","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 43 - Commercial interests","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Section 43 - Commercial interests","themes":["Commercial & supply chain"],"evidenceExcerpt":"Section 43 - Commercial interests Section 43 - Commercial interests","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Section 43 - Commercial interests","narrativeClaimKind":null},"ratingDelta":null,"transition":"Not comparable","endDateDeltaDays":null,"attentionScore":14,"attentionReasons":["In-year forecast variance is +43.0%"]},{"id":"MOD_0079_1213-Q1","year":2026,"name":"LIGHTNING PROGRAMME","department":"MOD","category":"Military Capability","description":"F-35B Lightning is a key element of Combat Air - a 5th Generation combat air vehicle with advanced sensors, mission systems and low observable technology. The F-35B provides real strategic opportunity, and its impressive capability has already been demonstrated and is recognised. It is jointly operated by the RAF and RN from both land and sea, with a main operating base at RAF Marham which currently houses 617 Squadron and 207 Squadron, the Operational Conversion Unit (OCU). The Lightning Force growth through delivering the second squadron, 809 NAS, at RAF Marham is a key dependency for the successful delivery of a critical Defence milestone of Carrier Strike capability.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 increased to GREEN. This is primarily due to the following factors. 1. The Initial Procurement Phase Full Operating Capability has been achieved, the benefits set out in the mandate have been delivered or are on track, and the Programme is now well positioned to transition responsibility to the Responsible Senior Owner and move into the Second Procurement Phase. 2. The GREEN rating was confirmed at Feb-26's Gateway Level 5 Review where the Review Team concluded that the Initial Procurement Phase of the UK’s F35 Lightning Programme had met its mandate and was ready for Graduation from the GMPP.","startDate":"2001-10-01","endDate":"2026-03-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 31/03/2026.","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Commercial & supply chain","Governance & assurance","Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 increased to GREEN. This is primarily due to the following factors. 1. The Initial Procurement Phase Full Operating Capability has been achieved, the benefits set out in the mandate have been delivered or are on track, and the Programme is now well…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 31/03/2026.","narrativeClaimKind":null,"history":[{"id":"MOD_0079_1213-Q1","year":2020,"name":"Lightning Programme","department":"MOD","category":"Military Capability","description":"To deliver a multi-role, carrier-capable aircraft, to be operated jointly by the Royal Air Force and Royal Navy.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber, which has improved since last year�s Q2 1819 Amber/Red, due primarily to the following factors; - Significant activity across all of the Defence Lines Of Development took place in order to rectify issues with weapons' clearances, infrastructure completion at RAF Marham and Sovereign Data Manager for Autonomic Logistics Information System integration on to UK networks. This all enabled the declaration of Capability Milestone 1, Initial Operational Capability from Land, on schedule in Dec 18 . - Post Initial Operational Capability declaration, in June 19, the Lightning Force undertook their first overseas deployment in order to test logistics and support at range. Due to early success the Lightning Force were able to conduct their first operational missions from RAF Akrotiri in Cyprus in support of Operation SHADER. - Significant programme and pan-Defence Lines Of Development effort to effectively burn down provisos from Initial Operating Capability in order to deepen and sustain Initial Operational Capability also contributed to the improved picture maintaining significant momentum for this and future milestones. Since the Q2 1920 (30th September 2019) Amber IPA DCA, the following primary project actions have impacted the original Q2 IPA DCA; - Programme management alongside Lightning Delivery Team and Defence Lines Of Development Stakeholders conducted regular deep dives into any issues in order to develop path to resolution.","startDate":"2001-10-01","endDate":"2035-03-31","scheduleNarrative":"The scheduled baseline project end date at Q2 1920 (30th September 2019) is 31/03/35, has not changed since last year's Q2 1819 date of 31/03/35, due primarily to the following factors; - The project remains on schedule with no foreseeable issues likely to affect a successful outcome","fyBaseline":711.86,"fyForecast":750.37,"fyVariance":5.0,"varianceNarrative":"The 19/20 in-year baseline / forecast variance at Q2 1920 (30th September 2019) of 5%, is due primarily to the following factors; - During this reporting period there was significant ongoing work on the underlying Lightning Cost Model therefore Control Total (Budget) figures were held at an old 2018 position. As a result there was no change to the control total which would have allowed for an updated forecast - Forex and accounting treatments will also have contributed to this data. Since the Q2 1920 (30th September 2019) 19/20 in-year baseline / forecast variance of 5%, the following non-project operating environment activities have impacted the original Q2 19/20 in-year baseline / forecast variance; - Foreign Exchange fluctuations drove some variance into the Programme due to contracts being placed through the US Joint Programme Office. Since the Q2 1920 (30th September 2019) 19/20 in-year baseline / forecast variance of 5%, the following primary project actions have impacted the original Q2 19/20 in-year variance; - During this reporting period there was significant ongoing work on the underlying Lightning Cost Model therefore Control Total (Budget) figures were held at an old 2018 position. As a result there was no change to the control total which would have allowed for an updated forecast.","wholeLifeCost":10393.3,"costNarrative":"The baseline Whole Life Cost at Q2 1920 (30th September 2019) is �10,393.30 m, has decreased by �81.89 m since last year's Q2 1819 (�m) baseline Whole Life Cost of �10,475.19 m, due primarily to the following factors; - During 2019 significant work was done within the Lightning Delivery Team and Air Command Programme team in order to rework and revalidate the Lightning cost model, ensuring that core assumptions remained valid and any ambiguity was removed from the programme. This, along with work with the Joint Programme Office to mature costings data enabled realism factors to be applied leading to a reduction to whole life forecasts. Since the Q2 1920 (30th September 2019) �10,393.30 m baseline Whole Life Cost, the following non-project operating environment activities have impacted the original baseline Q2 Whole Life Cost; - Foreign Exchange fluctuations drive some variance into the Programme due to contracts being placed the US Joint Programme Office. Since the Q2 1920 (30th September 2019) �10,393.30 m baseline Whole Life Cost, the following primary project actions have impacted the original Q2 baseline Whole Life Cost; - During 2019 significant work was done within the Lightning Delivery Team and Air Command Programme team in order to rework and revalidate the cost model, ensuring that core assumptions remained valid and any ambiguity was removed from the programme. This, along with work with the Joint Programme Office to mature costings data, enabled realism factors to be applied leading to a reduction to whole life forecasts.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Technical & integration","Workforce & capability"],"evidenceExcerpt":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber, which has improved since last year�s Q2 1819 Amber/Red, due primarily to the following factors; - Significant activity across all of the Defence Lines Of Development took place in order to rectify issues with weapons' clearances, infrastructure completion at RAF…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2020","sourceLabel":"IPA Annual Report 2019-20","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The scheduled baseline project end date at Q2 1920 (30th September 2019) is 31/03/35, has not changed since last year's Q2 1819 date of 31/03/35, due primarily to the following factors; - The project remains on schedule with no foreseeable issues likely to affect a successful outcome","narrativeClaimKind":null},{"id":"MOD_0079_1213-Q1","year":2021,"name":"Lightning Programme","department":"MOD","category":"Military Capability","description":"The intent of the Lightning Programme is the delivery of a multi-role, carrier-capable fighter aircraft, the Lockheed Martin F-35B Joint Strike Fighter, to be operated jointly by the Royal Air Force and Royal Navy. The F-35 provides the UK with a survivable, sustainable, expeditionary, Fifth Generation air capability in order to contribute to the widest possible range of operations. The Programme achieved Initial Operating Capability (Land) in December 2018, to deploy aircraft, held at Very High Readiness, from RAF Marham to a Deployed Operating Base and conduct an initial surge and enduring operation. In December 2020, Initial Operating Capability (Maritime) was declared to enable Lightning to deploy to a Queen Elizabeth Class Carrier and conduct operations from a land or sea base, contributing to the UK's Carrier Strike capability from this stage. Full Operating Capability (Concurrent Operations) will enable the full mass of the Lightning Force, including a second Front Line squadron, to deploy from RAF Marham to either a Deployed Operating Base and/or Queen Elizabeth Class Carrier to conduct an initial surge and enduring operation. Full Operating Capability (Concurrent Operations) is planned for December 2023, supporting the simultaneous Full Operating Capability (Carrier Strike) declaration.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating increased from Amber to Amber/red. This is primarily due to the following factors: Force Growth (sufficient numbers of trained and qualified personnel as well as aircraft) remains an issue and is being tracked and reported through quarterly Programme Boards. Funding approvals for the second Deployed Spares Pack and the second Front Line squadron (809 Naval Air Squadron) Infrastructure at RAF Marham are being sought for contract placement in the coming months to enable Full Operating Capability.","startDate":"2001-10-01","endDate":"2035-03-31","scheduleNarrative":"Compared to financial year 19/20-Q2, the project's end-date remained scheduled to finish on 31 March 2035 . This is primarily due to the following factors: the assumed end of F-35B production.","fyBaseline":700.04,"fyForecast":636.67,"fyVariance":-9.0,"varianceNarrative":"The budget variance exceeds 5%. The main driver for In-Year underspend comes from the recognition of income due from the global sales of F-35. This was enabled through the UK's investment, as a Tier 1 Partner, in the design and development of the capability. In addition, there were other minor movements that contributed to in-year underspend including review of project costs and accounting leading to the realisation of cost savings, favourable movement in the UK�:US$ exchange rate in the latter half of the Financial Year and refinement of the project's schedule and estimates, partly reflecting COVID impacts, led to a small reduction against planned expenditure.","wholeLifeCost":10164.26,"costNarrative":"Compared to financial year 19/20-Q2, the projects Baseline Whole Life Cost decreased from 10393.30m to �10164.26m. This is primarily due to the following factors: This is primarily due to the removal of erroneous foreign exchange approvals.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Workforce & capability","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating increased from Amber to Amber/red. This is primarily due to the following factors: Force Growth (sufficient numbers of trained and qualified personnel as well as aircraft) remains an issue and is being tracked and reported through quarterly…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 19/20-Q2, the project's end-date remained scheduled to finish on 31 March 2035 . This is primarily due to the following factors: the assumed end of F-35B production.","narrativeClaimKind":null},{"id":"MOD_0079_1213-Q1","year":2022,"name":"Lightning Programme","department":"MOD","category":"Military Capability","description":"F-35B Lightning II is a key element of Combat Air - a 5th generation combat air vehicle with advanced sensors, mission systems and low observable technology. Lightning provides real strategic opportunity, and its impressive capability has already been demonstrated and is recognised. It is jointly operated by the RAF and Royal Navy from both land and sea, with a main operating base at RAF Marham which currently houses 617 Squadron and 207 Squadron, the Operational Conversion Unit. T","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating decreased from Amber/Red to Red. This is primarily due to the following factors: Slow Force Growth which is preventing the Lightning Programme from delivering a 2nd Front-Line Squadron to the original planned timelines. As a compounding issue to Force Growth, Project ANVIL Phase 2 (the infrastructure for the 2nd Squadron at RAF Marham) is not yet affordable. The most recent IPA Gateway Assurance Review concluded the Lighting Programme had significant external influences outside of the Senior Responsible Officer's control.","startDate":"2001-10-01","endDate":"2048-03-30","scheduleNarrative":"Compared to 2021-Q4, the project end-date increased from 31 March 35 to 30 March 48. This is primarily due to the following factors: Correction to the previously published end to now reflect the approved Out of Service date. The programme needs to be re-baselined now that Lightning has reached a programmatic maturity where refinement of deliverable capability is required. Force Growth expectations, in particular, need to be reassessed in order to accurately understand what operational output date (e.g. two operational squadrons) might be achieved.","fyBaseline":894.58,"fyForecast":906.13,"fyVariance":1.0,"varianceNarrative":"The budget variance is inferior or equal to 5%.","wholeLifeCost":10414.0,"costNarrative":"Compared to 2021-Q4, the projects Baseline Whole Life Cost has increased by £249M (£10164.26M at Q4 20/21 to £10413.63M at Q4 21/22). This is primarily due to the following factors: Lightning is subject to incremental approvals as agreed in the Main Gate Business Case. Underlying cost growth due to inflationary pressures and refinement of cost estimates.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Governance & assurance","Approvals & decisions","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating decreased from Amber/Red to Red. This is primarily due to the following factors: Slow Force Growth which is preventing the Lightning Programme from delivering a 2nd Front-Line Squadron to the original planned timelines. As a compounding issue to…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to 2021-Q4, the project end-date increased from 31 March 35 to 30 March 48. This is primarily due to the following factors: Correction to the previously published end to now reflect the approved Out of Service date. The programme needs to be re-baselined now that Lightning has reached a programmatic maturity where refinement of deliverable capability is required. Force Growth expectations, in particular, need to be reassessed in order to accurately understand what operational output date (e.g. two operational squadrons) might be achieved.","narrativeClaimKind":null},{"id":"MOD_0079_1213-Q1","year":2023,"name":"Lightning Programme","department":"MOD","category":"Military Capability","description":"F-35B Lightning is a key element of Combat Air - a 5th Generation combat air vehicle with advanced sensors, mission systems and low observable technology. The F-35B provides real strategic opportunity, and its impressive capability has already been demonstrated and is recognised. It is jointly operated by the RAF and Royal Navy from both land and sea, with a main operating base at RAF Marham which currently houses 617 Squadron and 207 Squadron, the Operational Conversion Unit. The Lightning Force growth through delivering the second squadron, 809 NAS, at RAF Marham is a key dependency for the successful delivery of a critical Defence milestone of Carrier Strike capability.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 increased from Red (IPA rating) to Amber (SRO rating). This is primarily due to the following factors. Approval of an Outline Business Case has enabled ANVIL Phase 2 (the infrastructure for the 2nd Squadron at RAF Marham) to begin. This is a key enabling Project within the Programme. However Slow Force growth is preventing the Lightning Programme from delivering a 2nd Front-Line Squadron, now planned for 1 December 2023.","startDate":"2001-10-01","endDate":"2069-03-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 increased from 2048-03-30 to 2069-03-31. This is primarily due to the following factors. Future procurement of an additional 26 aircraft delivering a fleet of 74 which would allow the Out of Service Date of the aircraft to be extended to 2069 andalign with the QUEEN ELIZABETH class aircraft carrier Out of Service Date. Tranche 1, the initial phase of the Lightning Programme, is expected to achieve Full Operating Capability in late 2025, at which point the Lightning programme graduates to become Business as Usual.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This programme does not report cashable benefits. Its aim is to provision the armed forces with the equipment and / or infrastructure required.","themes":["Commercial & supply chain","Approvals & decisions","Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 increased from Red (IPA rating) to Amber (SRO rating). This is primarily due to the following factors. Approval of an Outline Business Case has enabled ANVIL Phase 2 (the infrastructure for the 2nd Squadron at RAF Marham) to begin. This is a key enabling Project…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 increased from 2048-03-30 to 2069-03-31. This is primarily due to the following factors. Future procurement of an additional 26 aircraft delivering a fleet of 74 which would allow the Out of Service Date of the aircraft to be extended to 2069 andalign with the QUEEN ELIZABETH class aircraft carrier Out of Service Date. Tranche 1, the initial phase of the Lightning Programme, is expected to achieve Full Operating Capability in late 2025, at which point the Lightning programme graduates to become Business as Usual.","narrativeClaimKind":null},{"id":"MOD_0079_1213-Q1","year":2024,"name":"Lightning Programme","department":"MOD","category":"Military Capability","description":"F-35B Lightning is a key element of Combat Air, a 5th Generation combat air vehicle with advanced sensors, mission systems and low observable technology. The F-35B provides real strategic opportunity, and its impressive capability has already been demonstrated and is recognised. It is jointly operated by the RAF and RN from both land and sea, with a main operating base at RAF Marham which currently houses 617 Squadron and 207 Squadron, the Operational Conversion Unit (OCU). The Lightning Force growth through delivering the second squadron, 809 NAS, at RAF Marham is a key dependency for the successful delivery of a critical Defence milestone of Carrier Strike capability.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The biggest ongoing risk to Full Operating Capability (FOC) is the provision of suitably qualified and experienced engineers to meet the operational workforce requirements. Successful delivery of FOC to time, cost and quality appears feasible but issues exist requiring management attention. These appear resolvable at this stage and, if addressed promptly, should not present a cost/schedule overrun.","startDate":"2001-10-01","endDate":"2025-12-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 decreased from 2069-03-31 to 2025-12-31. This is primarily due to the following factors. The programme previously reported the Out of Service Date of the aircraft in 2069 as the project end date. In accordance with IPA guidance, the end date now reflects the end of the Initial Procurement Phase.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":0.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 0m.","themes":["Commercial & supply chain","Cost & funding","Delivery & schedule","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The biggest ongoing risk to Full Operating Capability (FOC) is the provision of suitably qualified and experienced engineers to meet the operational workforce requirements.…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 decreased from 2069-03-31 to 2025-12-31. This is primarily due to the following factors. The programme previously reported the Out of Service Date of the aircraft in 2069 as the project end date. In accordance with IPA guidance, the end date now reflects the end of the Initial Procurement Phase.","narrativeClaimKind":null},{"id":"MOD_0079_1213-Q1","year":2025,"name":"LIGHTNING PROGRAMME","department":"MoD","category":"Military Capability","description":"F-35B Lightning is a key element of Combat Air - a 5th Generation combat air vehicle with advanced sensors, mission systems and low observable technology. The F-35B provides real strategic opportunity and its impressive capability has already been demonstrated and is recognised. It is jointly operated by the RAF and RN from both land and sea, with a main operating base at RAF Marham which currently houses 617 Squadron and 207 Squadron, the Operational Conversion Unit (OCU). The Lightning Force growth through delivering the second squadron, 809 Naval Air Squadron at RAF Marham, is a key dependency for the successful delivery of a critical Defence milestone of Carrier Strike capability.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. The biggest ongoing risk to Full Operating Capability (FOC) and the principal reason for the continuing Amber rating remains the provision of suitably qualified and experienced engineers to meet the operational workforce requirements. Recruitment of additional engineers began in April 2023, although it will take time for all the extra personnel to be trained and gain the necessary experience. Aircrew numbers and the sustainment of the cyber workforce also present challenges to Force growth. Despite these concerns, a high degree of confidence remains that FOC will be delivered to the approved timescale.","startDate":"2001-10-01","endDate":"2026-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/12/2025 to 31/03/2026. This is primarily due to the following factors. The Lightning platforms reported Out of Service Date remains 2069 and the Lightning Full Operating Capability remains scheduled to be achieved no later than 31 Dec 2025. At the end of FY 2025/26 the first procurement phase will be complete with 48 F-35B aircraft delivered and two front-line squadrons operating.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 43 - Commercial interests","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Workforce & capability","Commercial & supply chain","Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. The biggest ongoing risk to Full Operating Capability (FOC) and the principal reason for the continuing Amber rating remains the provision of suitably qualified and experienced engineers to meet the…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/12/2025 to 31/03/2026. This is primarily due to the following factors. The Lightning platforms reported Out of Service Date remains 2069 and the Lightning Full Operating Capability remains scheduled to be achieved no later than 31 Dec 2025. At the end of FY 2025/26 the first procurement phase will be complete with 48 F-35B aircraft delivered and two front-line squadrons operating.","narrativeClaimKind":null},{"id":"MOD_0079_1213-Q1","year":2026,"name":"LIGHTNING PROGRAMME","department":"MOD","category":"Military Capability","description":"F-35B Lightning is a key element of Combat Air - a 5th Generation combat air vehicle with advanced sensors, mission systems and low observable technology. The F-35B provides real strategic opportunity, and its impressive capability has already been demonstrated and is recognised. It is jointly operated by the RAF and RN from both land and sea, with a main operating base at RAF Marham which currently houses 617 Squadron and 207 Squadron, the Operational Conversion Unit (OCU). The Lightning Force growth through delivering the second squadron, 809 NAS, at RAF Marham is a key dependency for the successful delivery of a critical Defence milestone of Carrier Strike capability.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 increased to GREEN. This is primarily due to the following factors. 1. The Initial Procurement Phase Full Operating Capability has been achieved, the benefits set out in the mandate have been delivered or are on track, and the Programme is now well positioned to transition responsibility to the Responsible Senior Owner and move into the Second Procurement Phase. 2. The GREEN rating was confirmed at Feb-26's Gateway Level 5 Review where the Review Team concluded that the Initial Procurement Phase of the UK’s F35 Lightning Programme had met its mandate and was ready for Graduation from the GMPP.","startDate":"2001-10-01","endDate":"2026-03-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 31/03/2026.","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Commercial & supply chain","Governance & assurance","Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 increased to GREEN. This is primarily due to the following factors. 1. The Initial Procurement Phase Full Operating Capability has been achieved, the benefits set out in the mandate have been delivered or are on track, and the Programme is now well…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same at 31/03/2026.","narrativeClaimKind":null}],"previous":{"id":"MOD_0079_1213-Q1","year":2025,"name":"LIGHTNING PROGRAMME","department":"MoD","category":"Military Capability","description":"F-35B Lightning is a key element of Combat Air - a 5th Generation combat air vehicle with advanced sensors, mission systems and low observable technology. The F-35B provides real strategic opportunity and its impressive capability has already been demonstrated and is recognised. It is jointly operated by the RAF and RN from both land and sea, with a main operating base at RAF Marham which currently houses 617 Squadron and 207 Squadron, the Operational Conversion Unit (OCU). The Lightning Force growth through delivering the second squadron, 809 Naval Air Squadron at RAF Marham, is a key dependency for the successful delivery of a critical Defence milestone of Carrier Strike capability.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. The biggest ongoing risk to Full Operating Capability (FOC) and the principal reason for the continuing Amber rating remains the provision of suitably qualified and experienced engineers to meet the operational workforce requirements. Recruitment of additional engineers began in April 2023, although it will take time for all the extra personnel to be trained and gain the necessary experience. Aircrew numbers and the sustainment of the cyber workforce also present challenges to Force growth. Despite these concerns, a high degree of confidence remains that FOC will be delivered to the approved timescale.","startDate":"2001-10-01","endDate":"2026-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/12/2025 to 31/03/2026. This is primarily due to the following factors. The Lightning platforms reported Out of Service Date remains 2069 and the Lightning Full Operating Capability remains scheduled to be achieved no later than 31 Dec 2025. At the end of FY 2025/26 the first procurement phase will be complete with 48 F-35B aircraft delivered and two front-line squadrons operating.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 43 - Commercial interests","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Workforce & capability","Commercial & supply chain","Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. The biggest ongoing risk to Full Operating Capability (FOC) and the principal reason for the continuing Amber rating remains the provision of suitably qualified and experienced engineers to meet the…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/12/2025 to 31/03/2026. This is primarily due to the following factors. The Lightning platforms reported Out of Service Date remains 2069 and the Lightning Full Operating Capability remains scheduled to be achieved no later than 31 Dec 2025. At the end of FY 2025/26 the first procurement phase will be complete with 48 F-35B aircraft delivered and two front-line squadrons operating.","narrativeClaimKind":null},"ratingDelta":-1,"transition":"Improved","endDateDeltaDays":0,"attentionScore":14,"attentionReasons":["In-year forecast variance is +43.0%"]},{"id":"DHSC_0243_2324-Q1","year":2026,"name":"MODERNA STRATEGIC PARTNERSHIP PROGRAMME","department":"DHSC","category":"Government Transformation and Service Delivery","description":"Exempt under Section 43 - Commercial interests","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 43 - Commercial interests","startDate":"2022-12-20","endDate":null,"scheduleNarrative":"Exempt under Section 43 - Commercial interests","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Exempt under Section 43 - Commercial interests","themes":["Commercial & supply chain"],"evidenceExcerpt":"Exempt under Section 43 - Commercial interests Exempt under Section 43 - Commercial interests","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 43 - Commercial interests","narrativeClaimKind":null,"history":[{"id":"DHSC_0243_2324-Q1","year":2024,"name":"Moderna Strategic Partnership Programme","department":"DHSC","category":"Government Transformation and Service Delivery","description":"Moderna/UK Strategic Partnership (MSP) is a short-medium term GMPP change programme, with the aim of creating the conditions for success across HM Government in which the 10-year partnership with Moderna can deliver benefits across the UK. This Moderna/UK Strategic Partnership enables: _x000D_ 1) Moderna's build of a UK mRNA manufacturing facility to supply mRNA vaccines _x000D_ 2) managing the UK health ecosystem to enable and maximise Moderna's investment in Research & Development _x000D_ 3) provision of greater vaccine resilience for the UK in the event of a pandemic or UK health emergency.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","startDate":null,"endDate":null,"scheduleNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","themes":["Commercial & supply chain"],"evidenceExcerpt":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests. Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","narrativeClaimKind":null},{"id":"DHSC_0243_2324-Q1","year":2025,"name":"MODERNA STRATEGIC PARTNERSHIP PROGRAMME","department":"DHSC","category":"Infrastructure and Construction","description":"Section 43 - Commercial interests","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Section 43 - Commercial interests","startDate":"2022-12-22","endDate":null,"scheduleNarrative":"Section 43 - Commercial interests","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 43 - Commercial interests","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Section 43 - Commercial interests","themes":["Commercial & supply chain"],"evidenceExcerpt":"Section 43 - Commercial interests Section 43 - Commercial interests","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Section 43 - Commercial interests","narrativeClaimKind":null},{"id":"DHSC_0243_2324-Q1","year":2026,"name":"MODERNA STRATEGIC PARTNERSHIP PROGRAMME","department":"DHSC","category":"Government Transformation and Service Delivery","description":"Exempt under Section 43 - Commercial interests","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 43 - Commercial interests","startDate":"2022-12-20","endDate":null,"scheduleNarrative":"Exempt under Section 43 - Commercial interests","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Exempt under Section 43 - Commercial interests","themes":["Commercial & supply chain"],"evidenceExcerpt":"Exempt under Section 43 - Commercial interests Exempt under Section 43 - Commercial interests","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 43 - Commercial interests","narrativeClaimKind":null}],"previous":{"id":"DHSC_0243_2324-Q1","year":2025,"name":"MODERNA STRATEGIC PARTNERSHIP PROGRAMME","department":"DHSC","category":"Infrastructure and Construction","description":"Section 43 - Commercial interests","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Section 43 - Commercial interests","startDate":"2022-12-22","endDate":null,"scheduleNarrative":"Section 43 - Commercial interests","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 43 - Commercial interests","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Section 43 - Commercial interests","themes":["Commercial & supply chain"],"evidenceExcerpt":"Section 43 - Commercial interests Section 43 - Commercial interests","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Section 43 - Commercial interests","narrativeClaimKind":null},"ratingDelta":null,"transition":"Not comparable","endDateDeltaDays":null,"attentionScore":14,"attentionReasons":["In-year forecast variance is +43.0%"]},{"id":"MOD_0047_1112-Q1","year":2026,"name":"SPEARFISH UPGRADE PROGRAMME","department":"MOD","category":"Military Capability","description":"The Spearfish Upgrade Programme will deliver in-service an upgraded submarine launched heavy-weight Torpedo that is safe, sustainable and capable of defeating modern Antisubmarine Warfare and Anti-Surface Warfare threats in order to retain the UK’s dominance of the Underwater Battlespace.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 24 - National security","startDate":"2008-04-01","endDate":null,"scheduleNarrative":"Exempt under Section 24 - National security","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Exempt under Section 43 - Commercial interests","themes":["Commercial & supply chain"],"evidenceExcerpt":"Exempt under Section 24 - National security Exempt under Section 24 - National security","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 24 - National security","narrativeClaimKind":null,"history":[{"id":"MOD_0047_1112-Q1","year":2020,"name":"Spearfish Upgrade Programme","department":"MOD","category":"Military Capability","description":"To update the UK's submarine weapon systems. This includes improvements to the safety system to minimise residual risks and deliver improved performance against increasingly capable threats.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Red, which has declined since last year�s Q2 1819 Amber/Red, due primarily to the following factors; - Technical issues were encountered with the new weapon design during the submarine launched trial resulting in the trial being abandoned. The data from this trial was urgently required to support the ongoing technical investigation into weapon reliability and performance of the upgraded fibre-optic guidewire dispensing system. - The Weapon Thread project will deliver the submarine combat system upgrades that are necessary to deploy the new weapon. The schedule for delivery of these changes does not currently support a full transition to the upgraded weapon design before the old weapon design needs to be withdrawn from service. - Under the forecasted schedule for the Weapon Thread project the in-service conversion plan that will allow transition from the old weapon design to the new weapon design will place an extreme stress on the operational availability and reserve stockpile levels of the Spearfish Heavy Weight Torpedo. Since the Q2 1920 (30th September 2019) Red IPA DCA, the following non-project operating environment activities have impacted the original Q2 IPA DCA; - At this point the trials programme for the new weapon was dependent on submarine and surface asset availability and, given the operational demand for these assets, it was increasingly difficulty to successfully co-ordinate trials with RN platform availability. Since September 2019 a trials strategy has been developed that mitigates this dependency. Since the Q2 1920 (30th September 2019) Red IPA DCA, the following primary project actions have impacted the original Q2 IPA DCA; - Confidence in the weapon design, especially the fibre-optic dispensing system, has increased significantly following improvements in the manufacturing process, further shore-based testing and a successful repeat of Boat Trial 2. The weapon design has now been frozen and future trials are planned to improve the statistical confidence in weapon reliability. - An agreed safety case for the Weapon Thread Minimum Operating Capability design and completion of the Critical Design Review is required to progress through testing to manufacture. This has been the main effort of the Weapon thread team for several months and although not yet complete has progressed significantly.","startDate":"2008-04-01","endDate":"2024-03-31","scheduleNarrative":"The scheduled baseline project end date at Q2 1920 (30th September 2019) is 31/03/24, has not changed since last year's Q2 1819 date of 31/03/24, due primarily to the following factors; - Delivery of the upgraded weapon was subject to review due to the technical encountered during trials, however, it was still forecast to be significantly earlier than the date required to support operational use following platform conversion under Weapon Thread and therefore the overall forecast end date remained unchanged. - The Submarine Combat System upgrades are the key driver for the baseline end date. Delivery of these upgrades are expected to push the boundary of the existing MOD0 weapon life, which has become the de facto programme end date and this is relatively inflexible as it driven by weapon safety. Since the Q2 1920 (30th September 2019) baseline project end date of 31/03/24, the following primary project actions have impacted the original Q2 baseline project end date; - The in-water trials programme has now been decoupled from the availability of RN assets and plans for an overseas trial removed from the Critical Path. This will allow MOD to renegotiate a commercial position with the Prime contractor and to progress through the demonstration phase to full manufacture. - Since Q219/20 fourteen enterprise wide workshops have taken place working towards a whole-boat safety case for submarine intrinsic and dynamic safety when employing the MOD1 weapon design. Although this work is still ongoing significant progress has been made and critically no changes are anticipated to the current design.","fyBaseline":37.68,"fyForecast":35.32,"fyVariance":-6.0,"varianceNarrative":"The 19/20 in-year baseline / forecast variance at Q2 1920 (30th September 2019) of -6%, is due primarily to the following factors; - The in-year baseline costs for the Spearfish Programme included manufacturing and operational costs for the conduct of a number of in-water demonstration trials, including one very significant cost to conduct an overseas trial. Due to a combination of technical issues and RN Platform availability these trials were delayed. - During FY19/20 Navy Command requested DE&S to investigate potential savings measures to improve the Top Level Budget in-year Control Total position. The Spearfish Upgrade Project Team identified the costs allocated to the delayed in-water trials, offering to reprofile these costs into later years when these trials could be completed. Since the Q2 1920 (30th September 2019) 19/20 in-year baseline / forecast variance of -6%, the following primary project actions have impacted the original Q2 19/20 in-year variance; - No actions were necessary to recover the variance. As it was not be possible to complete the trials associated with these costs within year, Navy Command agreed a position to reprofile the costs into later years, which also alleviated the Top Level Budget Control Total position.","wholeLifeCost":414.52,"costNarrative":"The baseline Whole Life Cost at Q2 1920 (30th September 2019) is �414.52 m, has increased by �0.63 m since last year's Q2 1819 (�m) baseline Whole Life Cost of �413.89 m, due primarily to the following factors; - The extremely marginal increase (0.15%) in whole-life costs was due to an increase in the number of weapons required for in-water trials during the demonstration phase. These additional firings were requested by MOD to provide increased statistical confidence in the reliability and performance of the new weapon design. - It has not been possible to identify more than one factor driving such a marginal (0.15%) increase in whole life costs. Since the Q2 1920 (30th September 2019) �414.52 m baseline Whole Life Cost, the following primary project actions have impacted the original Q2 baseline Whole Life Cost; - The overall whole life costs for the Spearfish Upgrade Project have remain stable. This has been due pro-active management by the Project Team who have identified opportunities to reduce costs in some areas, in order to support emergent requirements and a demand for an increased number of in-water firings.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Scope & requirements","Delivery & schedule","Technical & integration"],"evidenceExcerpt":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Red, which has declined since last year�s Q2 1819 Amber/Red, due primarily to the following factors; - Technical issues were encountered with the new weapon design during the submarine launched trial resulting in the trial being abandoned. The data from this trial was…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2020","sourceLabel":"IPA Annual Report 2019-20","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The scheduled baseline project end date at Q2 1920 (30th September 2019) is 31/03/24, has not changed since last year's Q2 1819 date of 31/03/24, due primarily to the following factors; - Delivery of the upgraded weapon was subject to review due to the technical encountered during trials, however, it was still forecast to be significantly earlier than the date required to support operational use following platform conversion under Weapon Thread and therefore the overall forecast end date remained unchanged. - The Submarine Combat System upgrades are the key driver for the baseline end date. Delivery of these upgrades are expected to push the boundary of the existing MOD0 weapon life, which has become the de facto programme end date and this is relatively inflexible as it driven by weapon safety. Since the Q2 1920 (30th September 2019) baseline project end date of 31/03/24, the following primary project actions have impacted the original Q2 baseline project end date; - The in-water trials programme has now been decoupled from the availability of RN assets and plans for an overseas trial removed from the Critical Path. This will allow MOD to renegotiate a commercial position with the Prime contractor and to progress through the demonstration phase to full manufacture. - Since Q219/20 fourteen enterprise wide workshops have taken place working towards a whole-boat safety case for submarine intrinsic and dynamic safety when employing the MOD1 weapon design. Although this work is still ongoing significant progress has been made and critically no changes are anticipated to the current design.","narrativeClaimKind":null},{"id":"MOD_0047_1112-Q1","year":2021,"name":"Spearfish Upgrade Programme","department":"MOD","category":"Military Capability","description":"To deliver into service an upgraded submarine launched heavy-weight Torpedo that is safe, sustainable and capable of defeating modern Anti-Submarine Warfare and Anti-Surface Warfare threats in order to retain the UK's dominance of the Underwater Battlespace.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating decreased from Red to Amber. This is primarily due to the following factors: 1. Confidence has improved in the solution to a previous technical issue with the modified weapon as part of the Spearfish Upgrade�Projects. Successful Development Phase trials of the weapon have been conducted leading to acceptance of the final design. The Equipment Delivery Date for the Spearfish Upgrade�weapon was achieved on 31 March 2021 and an Initial Operating Capability declared; this included the delivery of the initial set of weapon modification sets and putting into place the logistic support arrangements. 2. Transition Plan activities to modify the existing stock of Spearfish Mod 0 weapons into Spearfish Upgrade weapons remains on target to meet the required delivery schedule. 3. The rating is no better than Amber owing to the continuing risk that the Submarine Combat System upgrade (Weapon Thread Project) will not deliver in time to match the rollout schedule of the Spearfish Upgrade weapons. The Weapon Thread project is on track to deliver on time but with no margin for delay remains within the Programme schedule. This defines the critical path to successful completion of the Programme.","startDate":"2008-04-01","endDate":"2024-03-31","scheduleNarrative":"Compared to financial year 19/20-Q2, the project's end-date remained scheduled to finish on 31 March 2024 . This is primarily due to the following factors: The Programme will end when all stock of Spearfish Mod 0 weapons have been converted to Spearfish Upgrade Project and when all operational submarines (not including those in Build or in Deep Maintenance Periods) have received the Weapon Thread upgrade to their Combat Systems. Delivery of the Weapon Thread upgrade to submarines in Build and Deep Maintenance Periods will be conducted as Business as Usual beyond the scope of the Programme. The change to the forecast Programme end-date has been driven by the risk of schedule delay to the delivery of the Weapon Thread Project and the need to match the installation of the Combat System upgrades to the Submarine Support and Maintenance Programme. It is not possible to slow the Transition Plan of Spearfish Upgrade weapon conversion to match any further delay to the delivery of the Weapon Thread Project owing to the life expiry date of the Spearfish Mod 0 weapons.","fyBaseline":93.98,"fyForecast":81.29,"fyVariance":-14.0,"varianceNarrative":"The budget variance exceeds 5%. Variance of �-12.688m (-14%). The programme current costing for 20/21 fell below the control total for the following reasons: . The programme has seen savings that were made during the recent contract negotiations alongside the recycling of torpedo fuel. There has also been some re-programming of activities on the Torpedoes contract which has led to some movement of activities into later years. . Application of realism to risk inside costing in Weapon Thread project.","wholeLifeCost":860.0,"costNarrative":"Compared to financial year 19/20-Q2, the projects Baseline Whole Life Cost increased from �414.52m to �860.00m. This is primarily due to the following factors: Whole Life Costs for the Spearfish Programme (when all stock of Spearfish Mod 0 weapons have been converted to Spearfish Mod 1 weapons and when all operational submarines (not including those in Build or in Deep Maintenance Periods) have received the Weapon Thread upgrade to their Combat Systems) is �860m. This includes the Spearfish Upgrade Project, Weapon Thread Project, and Project Whitehead/Torps In-Service Support. Estimated Whole Life Cost to maintain Mod 1 capability to 2060 is �1.6B.�","benefits":null,"benefitsNarrative":"","themes":["Delivery & schedule","Cost & funding","Commercial & supply chain","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating decreased from Red to Amber. This is primarily due to the following factors: 1. Confidence has improved in the solution to a previous technical issue with the modified weapon as part of the Spearfish Upgrade�Projects. Successful Development…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 19/20-Q2, the project's end-date remained scheduled to finish on 31 March 2024 . This is primarily due to the following factors: The Programme will end when all stock of Spearfish Mod 0 weapons have been converted to Spearfish Upgrade Project and when all operational submarines (not including those in Build or in Deep Maintenance Periods) have received the Weapon Thread upgrade to their Combat Systems. Delivery of the Weapon Thread upgrade to submarines in Build and Deep Maintenance Periods will be conducted as Business as Usual beyond the scope of the Programme. The change to the forecast Programme end-date has been driven by the risk of schedule delay to the delivery of the Weapon Thread Project and the need to match the installation of the Combat System upgrades to the Submarine Support and Maintenance Programme. It is not possible to slow the Transition Plan of Spearfish Upgrade weapon conversion to match any further delay to the delivery of the Weapon Thread Project owing to the life expiry date of the Spearfish Mod 0 weapons.","narrativeClaimKind":null},{"id":"MOD_0047_1112-Q1","year":2022,"name":"Spearfish Upgrade Programme","department":"MOD","category":"Military Capability","description":"To deliver in-service an upgraded submarine launched heavy-weight Torpedo that is safe, sustainable and capable of defeating modern Anti-Submarine Warfare and Anti-Surface Warfare threats in order to retain the UK's dominance of the Underwater Battlespace.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber. This is primarily due to the following factors: The continued technical challenges with the weapon design which have led to a 6-month delay in warshot weapon manufacture. However, work is ongoing to maintain the schedule and at this point the in-Service date currently remains unchanged","startDate":"2008-04-01","endDate":"2024-03-31","scheduleNarrative":"Compared to 2021-Q4, the project end-date remained scheduled to finish on 31 March 24. This is primarily due to the following factors:","fyBaseline":37.23,"fyForecast":35.33,"fyVariance":-5.0,"varianceNarrative":"The budget variance is inferior or equal to 5%.","wholeLifeCost":406.0,"costNarrative":"Compared to 2021-Q4, the projects baseline Whole Life Cost decreased from 406.50(£m) to 406.46 (£m). This is primarily due to the following factors: The revised Whole Life Costs remain within tolerable limits","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Scope & requirements","Technical & integration"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber. This is primarily due to the following factors: The continued technical challenges with the weapon design which have led to a 6-month delay in warshot weapon manufacture. However, work is ongoing to maintain the schedule and…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to 2021-Q4, the project end-date remained scheduled to finish on 31 March 24. This is primarily due to the following factors:","narrativeClaimKind":null},{"id":"MOD_0047_1112-Q1","year":2023,"name":"Spearfish Upgrade Programme","department":"MOD","category":"Military Capability","description":"To deliver in-service an upgraded submarine launched heavy-weight Torpedo that is safe, sustainable and capable of defeating modern Anti-Submarine Warfare and Anti-Surface Warfare threats in order to retain the UK's dominance of the Underwater Battlespace.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. The continued challenges to the schedule imposed by both technical complexity and changes to fit opportunities to the submarine platforms.","startDate":"2008-04-01","endDate":"2024-03-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2024-03-31. This is primarily due to the following factors. Despite significant progress, the continued technical, industrial and supply chain challenges faced by the programme still threaten the feasibility of programme schedule.","fyBaseline":31.41,"fyForecast":30.27,"fyVariance":-4.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":405.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 decreased from 406m. to 405m. This is primarily due to the following factors. A Foreign exchange variance and a double counted accrual which has been removed.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This programme does not report cashable benefits. Its aim is to provision the armed forces with the equipment and / or infrastructure required.","themes":["Cost & funding","Delivery & schedule","Technical & integration","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. The continued challenges to the schedule imposed by both technical complexity and changes to fit opportunities to the submarine platforms. Compared to financial year…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2024-03-31. This is primarily due to the following factors. Despite significant progress, the continued technical, industrial and supply chain challenges faced by the programme still threaten the feasibility of programme schedule.","narrativeClaimKind":null},{"id":"MOD_0047_1112-Q1","year":2024,"name":"Spearfish Upgrade Programme","department":"MOD","category":"Military Capability","description":"To deliver in-service an upgraded submarine launched heavy-weight Torpedo that is safe, sustainable and capable of defeating modern Anti-Submarine Warfare and Anti-Surface Warfare threats in order to retain the UK’s dominance of the Underwater Battlespace.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure and Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remains at Amber. This is primarily due to the following factors. Delivery progress made to date balanced against the technical complexity of the programme and its dependencies on the submarine upkeep programme. On advice from the recent Infrastructure and Projects Authority Gateway Review, the Spearfish Upgrade Programme End-date milestone has been amended to reflect the Delivery Confidence Assessment of the entire programme rather than that of only one of the three projects which the Spearfish Upgrade Programme is dependent upon.","startDate":"2008-04-01","endDate":"2025-03-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 increased from 2024-03-31 to 2025-03-31. This is primarily due to the following factors. Following advice from a recent IPA Gateway Review, the Spearfish Upgrade Programme End-date milestone has been amended so that it now reflects the closure of the Spearfish Upgrade Programme through delivery by the constituent three projects, rather than being limited to just the Spearfish Upgrade Programme Weapon project. Adjustment of this milestone is purely administrative to ensure reporting is aligned with the previous and most recent Infrastructure and Projects Authority Gateway Review.","fyBaseline":86.84,"fyForecast":68.46,"fyVariance":-21.165,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. In year variance to budget due to delays within subcontractors delivery. The Spearfish Upgrade project milestone payment has moved into next FY reflecting delays in delivery of the Spearfish Upgrade Programme Mod Kits. Since the previous Transparency report, the Programme has been directed to include the financial details for Weapon Thread and Whitehead to encompass the full programme, which is also reflected in the variance.","wholeLifeCost":1402.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 increased from 405m to 1402m. This is primarily due to the following factors. The inclusion of Weapon Thread project and Torpedo In-Service Support costs in this quarter's report as directed by the Infrastructure and Projects Authority Gateway Review. These additional projects have their own centrally approved business cases and Approved Budgetary Levels and are managed accordingly. The Torpedo In-Service Support costs reported are indicative owing to the commercial arrangements involved and include disposal costs for Spearfish Mod 0 until 2028. Through Life costs for Spearfish Mod 1 past 2028 are a planning assumption for a commercial programme currently in the `Identify` stage.","benefits":0.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 0m.","themes":["Delivery & schedule","Cost & funding","Governance & assurance","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure and Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remains at Amber. This is primarily due to the following factors. Delivery progress made to date balanced against the technical complexity of the programme and its dependencies on the submarine upkeep programme. On advice from…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 increased from 2024-03-31 to 2025-03-31. This is primarily due to the following factors. Following advice from a recent IPA Gateway Review, the Spearfish Upgrade Programme End-date milestone has been amended so that it now reflects the closure of the Spearfish Upgrade Programme through delivery by the constituent three projects, rather than being limited to just the Spearfish Upgrade Programme Weapon project. Adjustment of this milestone is purely administrative to ensure reporting is aligned with the previous and most recent Infrastructure and Projects Authority Gateway Review.","narrativeClaimKind":null},{"id":"MOD_0047_1112-Q1","year":2025,"name":"SPEARFISH UPGRADE PROGRAMME","department":"MoD","category":"Military Capability","description":"To deliver in-service an upgraded submarine launched heavy-weight Torpedo that is safe, sustainable and capable of defeating modern Anti-Submarine Warfare and Anti-Surface Warfare threats in order to retain the UK’s dominance of the Underwater Battlespace.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Section 24 - National security","startDate":"2008-04-01","endDate":null,"scheduleNarrative":"Section 24 - National security","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 43 - Commercial interests","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Section 24 - National security","themes":["Commercial & supply chain"],"evidenceExcerpt":"Section 24 - National security Section 24 - National security","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Section 24 - National security","narrativeClaimKind":null},{"id":"MOD_0047_1112-Q1","year":2026,"name":"SPEARFISH UPGRADE PROGRAMME","department":"MOD","category":"Military Capability","description":"The Spearfish Upgrade Programme will deliver in-service an upgraded submarine launched heavy-weight Torpedo that is safe, sustainable and capable of defeating modern Antisubmarine Warfare and Anti-Surface Warfare threats in order to retain the UK’s dominance of the Underwater Battlespace.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 24 - National security","startDate":"2008-04-01","endDate":null,"scheduleNarrative":"Exempt under Section 24 - National security","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Exempt under Section 43 - Commercial interests","themes":["Commercial & supply chain"],"evidenceExcerpt":"Exempt under Section 24 - National security Exempt under Section 24 - National security","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 24 - National security","narrativeClaimKind":null}],"previous":{"id":"MOD_0047_1112-Q1","year":2025,"name":"SPEARFISH UPGRADE PROGRAMME","department":"MoD","category":"Military Capability","description":"To deliver in-service an upgraded submarine launched heavy-weight Torpedo that is safe, sustainable and capable of defeating modern Anti-Submarine Warfare and Anti-Surface Warfare threats in order to retain the UK’s dominance of the Underwater Battlespace.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Section 24 - National security","startDate":"2008-04-01","endDate":null,"scheduleNarrative":"Section 24 - National security","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 43 - Commercial interests","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Section 24 - National security","themes":["Commercial & supply chain"],"evidenceExcerpt":"Section 24 - National security Section 24 - National security","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Section 24 - National security","narrativeClaimKind":null},"ratingDelta":null,"transition":"Not comparable","endDateDeltaDays":null,"attentionScore":14,"attentionReasons":["In-year forecast variance is +43.0%"]},{"id":"BEIS_0019_2122-Q1","year":2026,"name":"Sizewell C Project","department":"DESNZ","category":"Infrastructure and Construction","description":"Exempt under Section 43 - Commercial interests","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 43 - Commercial interests","startDate":null,"endDate":null,"scheduleNarrative":"Exempt under Section 43 - Commercial interests","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Exempt under Section 43 - Commercial interests","themes":["Commercial & supply chain"],"evidenceExcerpt":"Exempt under Section 43 - Commercial interests Exempt under Section 43 - Commercial interests","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 43 - Commercial interests","narrativeClaimKind":null,"history":[{"id":"BEIS_0019_2122-Q1","year":2022,"name":"Sizewell C","department":"BEIS","category":"Infrastructure and Construction","description":"The Sizewell C (SZC) project team will lead on negotiations with SZC and EDF (its main shareholder) and will have responsibility for designing a viable funding/financing model that delivers the Government objectives of value for money, fiscal responsibility, and decarbonisation. EDF's planned project in Suffolk - Sizewell C - is considered the most advanced new nuclear project in the UK and is likely to be the only project capable of delivering the Energy White Paper objective for at least one large scale nuclear project to reach Final Investment Decision (FID) this Parliament.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","startDate":"2021-01-01","endDate":"2023-04-21","scheduleNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"","themes":["Commercial & supply chain"],"evidenceExcerpt":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests. Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","narrativeClaimKind":null},{"id":"BEIS_0019_2122-Q1","year":2023,"name":"Sizewell C","department":"DESNZ","category":"Infrastructure and Construction","description":"The Sizewell C (SZC) project team will lead on negotiations with SZC and EDF (joint shareholder in the project with Government) and will have responsibility for designing a viable funding/financing model that delivers the Government objectives of value for money, fiscal responsibility, and decarbonisation. The Sizewell C project in Suffolk is considered the most advanced new nuclear project in the UK and is likely to be the only project capable of delivering the Energy White Paper objective for at least one large scale nuclear project to reach Final Investment Decision (FID) this Parliament.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","startDate":"2021-01-01","endDate":null,"scheduleNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","themes":["Commercial & supply chain"],"evidenceExcerpt":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests. Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","narrativeClaimKind":null},{"id":"BEIS_0019_2122-Q1","year":2024,"name":"Sizewell C","department":"DESNZ","category":"Infrastructure and Construction","description":"The Sizewell C (SZC) project team will lead on negotiations with SZC and EDF (joint shareholder in the project with Government) and will have responsibility for designing a viable funding/financing model that delivers the Government objectives of value for money, fiscal responsibility, and decarbonisation. The Sizewell C project in Suffolk is considered the most advanced new nuclear project in the UK and is likely to be the only project capable of delivering the Energy White Paper objective for at least one large scale nuclear project to reach Final Investment Decision (FID) this Parliament. Please note that Sizewell C Project has requested an exemption due to commercial interests.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","startDate":null,"endDate":null,"scheduleNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","themes":["Commercial & supply chain"],"evidenceExcerpt":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests. Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","narrativeClaimKind":null},{"id":"BEIS_0019_2122-Q1","year":2025,"name":"NEW NUCLEAR PROJECT (SIZEWELL C)","department":"DESNZ","category":"Infrastructure and Construction","description":"Section 43 - Commercial interests","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Section 43 - Commercial interests","startDate":null,"endDate":null,"scheduleNarrative":"Section 43 - Commercial interests","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 43 - Commercial interests","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Section 43 - Commercial interests","themes":["Commercial & supply chain"],"evidenceExcerpt":"Section 43 - Commercial interests Section 43 - Commercial interests","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Section 43 - Commercial interests","narrativeClaimKind":null},{"id":"BEIS_0019_2122-Q1","year":2026,"name":"Sizewell C Project","department":"DESNZ","category":"Infrastructure and Construction","description":"Exempt under Section 43 - Commercial interests","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 43 - Commercial interests","startDate":null,"endDate":null,"scheduleNarrative":"Exempt under Section 43 - Commercial interests","fyBaseline":43.0,"fyForecast":43.0,"fyVariance":43.0,"varianceNarrative":"Exempt under Section 43 – Commercial interests​","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Exempt under Section 43 - Commercial interests","themes":["Commercial & supply chain"],"evidenceExcerpt":"Exempt under Section 43 - Commercial interests Exempt under Section 43 - Commercial interests","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 43 - Commercial interests","narrativeClaimKind":null}],"previous":{"id":"BEIS_0019_2122-Q1","year":2025,"name":"NEW NUCLEAR PROJECT (SIZEWELL C)","department":"DESNZ","category":"Infrastructure and Construction","description":"Section 43 - Commercial interests","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Section 43 - Commercial interests","startDate":null,"endDate":null,"scheduleNarrative":"Section 43 - Commercial interests","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 43 - Commercial interests","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Section 43 - Commercial interests","themes":["Commercial & supply chain"],"evidenceExcerpt":"Section 43 - Commercial interests Section 43 - Commercial interests","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Section 43 - Commercial interests","narrativeClaimKind":null},"ratingDelta":null,"transition":"Not comparable","endDateDeltaDays":null,"attentionScore":14,"attentionReasons":["In-year forecast variance is +43.0%"]},{"id":"MOD_0110_1718-Q1","year":2026,"name":"MODNET EVOLVE","department":"MOD","category":"Information and Communications Technology (ICT)","description":"MODNET Evolve provides the essential base IT infrastructure needed by the MOD at OFFICIAL and SECRET on exit from the 20 year legacy contract with the ATLAS consortium. It achieves independence from major monolithic IT contracts by disaggregating them into components, and driving better value for money by exploiting the increasing commoditisation of modern IT services. Additionally, the associated ‘in-housing’ of key IT management capabilities enables MOD to control its IT design, providing the basis for a single enterprise architecture that will meet the MOD's evolving business needs.","ipaDca":"Green","sroDca":null,"deliveryConfidence":"Green","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 increased to Green. This is primarily due to the following factors. 1. The completion of the migration of all 180,000 OFFICIAL Tier users worldwide to the new MODNET OFFICIAL service, the completion of the migration of the 20,000 SECRET Tier users worldwide to the new MODNET SECRET service, and the planned closure of the programme by July 2026.","startDate":"2016-02-29","endDate":"2026-07-31","scheduleNarrative":"Compared to financial year 24/25-Q4 the programme's end date at 25/26-Q4 remained the same at 31/07/2026.","fyBaseline":30.39,"fyForecast":42.05,"fyVariance":38.37,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. 1. Reflects a forecast over-spend against budget of £12.037M and is primarily due to the revised delivery schedule for the OFFICIAL Tier, which resulted in legacy services continuing for a further 2 months.","wholeLifeCost":309.19,"costNarrative":"Compared to financial year 24/25-Q4, the projects departmental-agreed forecast Whole Life Cost at 25/26-Q4 (measured in £m) decreased from £370.68M to £262.10M. This is primarily due to the following factors. 1. Three projects have been transferred from the core MODNET Evolve change programme to the respective System Owners who are responsible for runing and introducng routine updates to the platforms.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmental-agree monetised benefits at 25/26-Q4 remained at 0m","themes":["Cost & funding","Delivery & schedule","Technical & integration","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 increased to Green. This is primarily due to the following factors. 1. The completion of the migration of all 180,000 OFFICIAL Tier users worldwide to the new MODNET OFFICIAL service, the completion of the migration of the 20,000 SECRET Tier users…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4 the programme's end date at 25/26-Q4 remained the same at 31/07/2026.","narrativeClaimKind":null,"history":[{"id":"MOD_0110_1718-Q1","year":2020,"name":"MODnet Evolve","department":"MOD","category":"ICT","description":"Sustain OFFICIAL and SECRET Information Communications and Technology (ICT) services in the Base and Base Overseas environments from the end of the ATLAS New Style of IT (Base) (NSOIT(B)) contract.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber/Red, which has not changed since last year�s Q2 1819 Amber/Red, due primarily to the following factors; - The MODNet Evolve Programme has been impacted by Departmental spend control measures that resulted in the pause of several of its Projects until Apr 2020. A Review Note to the Defence Investment Approvals Committee will re-set the Programme by Sep 2020. - The MODNet Evolve Programme continues to have a heavy reliance on contracted support though an improved position has been achieved through the implementation of the Defence Digital resource strategy this is not expected to address the current imbalance until late in 2020. Since the Q2 1920 (30th September 2019) Amber/Red IPA DCA, the following primary project actions have impacted the original Q2 IPA DCA; - Defence Digital has implemented a MODNet Evolve Resource strategy that is addressing the Programmes heavy reliance on contracted support. - The MODNet Evolve Programme has raised a Review Note to the MOD Investment Approvals Committee to address the change driven by the Departmental spend control measures implemented in Nov 2019.","startDate":"2016-02-29","endDate":"2021-09-01","scheduleNarrative":"The scheduled baseline project end date at Q2 1920 (30th September 2019) is 01/09/21, has shortened by 313 days since last year's Q2 1819 date of 11/07/22, due primarily to the following factors; - The dates presented in Q2 18/19 related to the end of Transition from the current contract to new services. Dates presented in Q2 19/20 relate to a contract award date and do not represent the Programme end date. Since the Q2 1920 (30th September 2019) baseline project end date of 01/09/21, the following non-project operating environment activities have impacted the original Q2 baseline project end date; - The MODNet Evolve Programme has been impacted by Departmental spend control measures that resulted in the pause of three of its Projects until Apr 2020. This has delayed the procurement activity of three of the Projects within the Programme, Managed Print, Records management and Productivity and collaboration. The pause has required the programme to raise a Review Note to bring the projects back within their approvals.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests)","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests)","benefits":null,"benefitsNarrative":"","themes":["Commercial & supply chain","Approvals & decisions","Cost & funding","Governance & assurance"],"evidenceExcerpt":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber/Red, which has not changed since last year�s Q2 1819 Amber/Red, due primarily to the following factors; - The MODNet Evolve Programme has been impacted by Departmental spend control measures that resulted in the pause of several of its Projects until Apr 2020. A…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2020","sourceLabel":"IPA Annual Report 2019-20","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The scheduled baseline project end date at Q2 1920 (30th September 2019) is 01/09/21, has shortened by 313 days since last year's Q2 1819 date of 11/07/22, due primarily to the following factors; - The dates presented in Q2 18/19 related to the end of Transition from the current contract to new services. Dates presented in Q2 19/20 relate to a contract award date and do not represent the Programme end date. Since the Q2 1920 (30th September 2019) baseline project end date of 01/09/21, the following non-project operating environment activities have impacted the original Q2 baseline project end date; - The MODNet Evolve Programme has been impacted by Departmental spend control measures that resulted in the pause of three of its Projects until Apr 2020. This has delayed the procurement activity of three of the Projects within the Programme, Managed Print, Records management and Productivity and collaboration. The pause has required the programme to raise a Review Note to bring the projects back within their approvals.","narrativeClaimKind":null},{"id":"MOD_0110_1718-Q1","year":2021,"name":"MODnet Evolve","department":"MOD","category":"ICT","description":"MODNET Evolve will sustain the essential base Information and Communications Technology infrastructure needed by the Ministry of Defence on exit from the current contract.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber/red. This is primarily due to the following factors: The Skills, Capability and complexity of Dependencies across the Programme results in a Delivery Confidence assessment being held at Amber/Red. The resourcing of the Future Secret project remains a risk, but the approval of the Strategic Outline Case will help address this early in the next quarter. A number of successes have occurred across the Programme in this reporting period: Approval of the Strategic Outline Case for Future Secret; Release of the Invitation to Negotiate for End User Services; and an Invitation to Tender for Managed Print and Electronic Records Management. COVID-19 - Has not impacted the MODNet Evolve main delivery however it is presenting challenges to the Future Operations Service Management delivery.","startDate":"2011-01-01","endDate":"2026-11-30","scheduleNarrative":"Compared to financial year 19/20-Q2, the project's end-date increased from 11 July 2022 to 30 November 2026 . This is primarily due to the following factors: There were dates presented in the 19/20-Q2 transparency return referring to a project end date of 11 July 2022. The dates presented related to the end of transition from the current contract to new services. The scheduled baseline programme end date remains at 30 November 2026. However, the following are areas of risk for the baseline programme end date: Supplier requests to extend the End User Services procurement window have pushed the dates outside of their current time approval. This was formally accepted since maintaining a viable competition was key to success for End User Services. Similar delays have impacted Records Management and Managed Print procurement, these projects currently remain within their approvals envelope. Changes to the Defence Digital strategy for Performance and Cost is driving a change�to� the commercial approach. This will mean a cheaper outcome and support services transitioning from the current contract.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"","themes":["Commercial & supply chain","Delivery & schedule","Approvals & decisions","Cost & funding"],"evidenceExcerpt":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber/red. This is primarily due to the following factors: The Skills, Capability and complexity of Dependencies across the Programme results in a Delivery Confidence assessment being held at Amber/Red. The resourcing of the Future…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 19/20-Q2, the project's end-date increased from 11 July 2022 to 30 November 2026 . This is primarily due to the following factors: There were dates presented in the 19/20-Q2 transparency return referring to a project end date of 11 July 2022. The dates presented related to the end of transition from the current contract to new services. The scheduled baseline programme end date remains at 30 November 2026. However, the following are areas of risk for the baseline programme end date: Supplier requests to extend the End User Services procurement window have pushed the dates outside of their current time approval. This was formally accepted since maintaining a viable competition was key to success for End User Services. Similar delays have impacted Records Management and Managed Print procurement, these projects currently remain within their approvals envelope. Changes to the Defence Digital strategy for Performance and Cost is driving a change�to� the commercial approach. This will mean a cheaper outcome and support services transitioning from the current contract.","narrativeClaimKind":null},{"id":"MOD_0110_1718-Q1","year":2022,"name":"MODnet Evolve","department":"MOD","category":"ICT","description":"MODNET Evolve will sustain the essential base Information and Communications Technology infrastructure needed by the Ministry of Defence on exit from the current contracted service.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating decreased from Amber/Red to Red. This is primarily due to the following factors: The main reason for Red is because of necessary need to pause and replan End User Services. In turn this contributed towards an unsuccessful procurement of Electronic Records Management. It has also been necessary to review the delivery strategy of Classified MODNet as recommended by the Infrastructure and Projects Authority.","startDate":"2016-02-29","endDate":"2026-11-30","scheduleNarrative":"Compared to 2021-Q4, the project end-date remained scheduled to finish on 30 November 2026.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests)","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests)","benefits":null,"benefitsNarrative":"","themes":["Commercial & supply chain","Delivery & schedule","Cost & funding","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating decreased from Amber/Red to Red. This is primarily due to the following factors: The main reason for Red is because of necessary need to pause and replan End User Services. In turn this contributed towards an unsuccessful procurement of…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to 2021-Q4, the project end-date remained scheduled to finish on 30 November 2026.","narrativeClaimKind":null},{"id":"MOD_0110_1718-Q1","year":2023,"name":"MODnet Evolve","department":"MOD","category":"ICT","description":"MODNet Evolve will sustain the essential base Information and Communications Technology infrastructure needed by the Ministry of Defence on exit from the current contracted service.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Red. This is primarily due to the following factors. The assessment of the deliverability of the MOD Official, End User Services and Future Secret Projects. However the recovery plan is in place and the programme is making positive progress and the Future Secret project is now being reset. Also linkages are being strengthened between the current MODnet Official network and its replacement End User Services project.","startDate":"2016-02-29","endDate":null,"scheduleNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This programme does not report cashable benefits. Its aim is to provision the armed forces with the equipment and / or infrastructure required.","themes":["Commercial & supply chain","Delivery & schedule","Cost & funding","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Red. This is primarily due to the following factors. The assessment of the deliverability of the MOD Official, End User Services and Future Secret Projects. However the recovery plan is in place and the programme is…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","narrativeClaimKind":null},{"id":"MOD_0110_1718-Q1","year":2024,"name":"MODnet Evolve","department":"MOD","category":"ICT","description":"MODNET Evolve provides the essential base IT infrastructure needed by the MOD at OFFICIAL and SECRET on exit from the current contract with the ATLAS consortium. It achieves independence from major monolithic IT contracts by disaggregating them into components; and driving better value for money by exploiting the increasing commoditisation of modern IT services. Additionally; the associated ‘in-housing’ of key IT management capabilities enables MOD to regain control of its IT design; providing the basis for a single enterprise architecture that will meet the MOD's evolving business needs.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Red. This is primarily due to the following factors. The IPA’s review, conducted ten months previously in May 23, assessed that while there is greater delivery confidence with the MODNet Official project there remains uncertainty with the strategic alignment of the Future SECRET project which may, as a result, encounter delays with the Outline Business Case submission. The SROs 23/24-Q4 Delivery Confidence Assessment of Amber was confirmed by the IPA the following month, in April 2024 when an Assurance Review recognised the significant progress made against the Action Plan.","startDate":"2016-02-29","endDate":null,"scheduleNarrative":"Exempt under Section 26 of the Freedom of Information Act 2000 (Defence)","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":0.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 0m.","themes":["Commercial & supply chain","Delivery & schedule","Governance & assurance","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Red. This is primarily due to the following factors. The IPA’s review, conducted ten months previously in May 23, assessed that while there is greater delivery confidence with the MODNet Official project there remains uncertainty…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 26 of the Freedom of Information Act 2000 (Defence)","narrativeClaimKind":null},{"id":"MOD_0110_1718-Q1","year":2025,"name":"MODNET EVOLVE","department":"MoD","category":"Military Capability","description":"MODNET Evolve provides the essential base IT infrastructure needed by the MOD at OFFICIAL and SECRET on exit from the 20 year legacy contract with the ATLAS consortium. It achieves independence from major monolithic IT contracts by disaggregating them into components; and driving better value for money by exploiting the increasing commodification of modern IT services. Additionally, the associated ‘in-housing’ of key IT management capabilities enables MOD to control its IT design, providing the basis for a single enterprise architecture that will meet the MOD's evolving business needs.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 increased from RED to AMBER. This is primarily due to the following factors. The migration of all 200,000 Official Tier users worldwide to the new service is underway and will complete in the next financial year. The End User Services (SECRET) contract has been placed and all SECRET Tier users will be migrated to the new service by June 2025, and over 95% of users have moved to the new Managed Print Service which will be completed by July 2025.","startDate":"2016-02-29","endDate":null,"scheduleNarrative":"Section 26 - Defence","fyBaseline":60.93,"fyForecast":43.99,"fyVariance":27.8,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. This reflects a forecast under-spend against budget of £16.957M and is due to the revised delivery schedule for the OFFICIAL Tier.","wholeLifeCost":370.68,"costNarrative":"The project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) is 370.681 This is primarily due to the following factors. Departmental financial pressures have reduced the programme’s budget in FY 24/25 and FY 25/26.","benefits":431.99,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmental-agree monetised benefits at 24/25-Q4 remained at 0m","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Technical & integration"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 increased from RED to AMBER. This is primarily due to the following factors. The migration of all 200,000 Official Tier users worldwide to the new service is underway and will complete in the next financial year. The End User Services (SECRET) contract has been placed…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Section 26 - Defence","narrativeClaimKind":null},{"id":"MOD_0110_1718-Q1","year":2026,"name":"MODNET EVOLVE","department":"MOD","category":"Information and Communications Technology (ICT)","description":"MODNET Evolve provides the essential base IT infrastructure needed by the MOD at OFFICIAL and SECRET on exit from the 20 year legacy contract with the ATLAS consortium. It achieves independence from major monolithic IT contracts by disaggregating them into components, and driving better value for money by exploiting the increasing commoditisation of modern IT services. Additionally, the associated ‘in-housing’ of key IT management capabilities enables MOD to control its IT design, providing the basis for a single enterprise architecture that will meet the MOD's evolving business needs.","ipaDca":"Green","sroDca":null,"deliveryConfidence":"Green","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 increased to Green. This is primarily due to the following factors. 1. The completion of the migration of all 180,000 OFFICIAL Tier users worldwide to the new MODNET OFFICIAL service, the completion of the migration of the 20,000 SECRET Tier users worldwide to the new MODNET SECRET service, and the planned closure of the programme by July 2026.","startDate":"2016-02-29","endDate":"2026-07-31","scheduleNarrative":"Compared to financial year 24/25-Q4 the programme's end date at 25/26-Q4 remained the same at 31/07/2026.","fyBaseline":30.39,"fyForecast":42.05,"fyVariance":38.37,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. 1. Reflects a forecast over-spend against budget of £12.037M and is primarily due to the revised delivery schedule for the OFFICIAL Tier, which resulted in legacy services continuing for a further 2 months.","wholeLifeCost":309.19,"costNarrative":"Compared to financial year 24/25-Q4, the projects departmental-agreed forecast Whole Life Cost at 25/26-Q4 (measured in £m) decreased from £370.68M to £262.10M. This is primarily due to the following factors. 1. Three projects have been transferred from the core MODNET Evolve change programme to the respective System Owners who are responsible for runing and introducng routine updates to the platforms.","benefits":null,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmental-agree monetised benefits at 25/26-Q4 remained at 0m","themes":["Cost & funding","Delivery & schedule","Technical & integration","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 increased to Green. This is primarily due to the following factors. 1. The completion of the migration of all 180,000 OFFICIAL Tier users worldwide to the new MODNET OFFICIAL service, the completion of the migration of the 20,000 SECRET Tier users…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4 the programme's end date at 25/26-Q4 remained the same at 31/07/2026.","narrativeClaimKind":null}],"previous":{"id":"MOD_0110_1718-Q1","year":2025,"name":"MODNET EVOLVE","department":"MoD","category":"Military Capability","description":"MODNET Evolve provides the essential base IT infrastructure needed by the MOD at OFFICIAL and SECRET on exit from the 20 year legacy contract with the ATLAS consortium. It achieves independence from major monolithic IT contracts by disaggregating them into components; and driving better value for money by exploiting the increasing commodification of modern IT services. Additionally, the associated ‘in-housing’ of key IT management capabilities enables MOD to control its IT design, providing the basis for a single enterprise architecture that will meet the MOD's evolving business needs.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 increased from RED to AMBER. This is primarily due to the following factors. The migration of all 200,000 Official Tier users worldwide to the new service is underway and will complete in the next financial year. The End User Services (SECRET) contract has been placed and all SECRET Tier users will be migrated to the new service by June 2025, and over 95% of users have moved to the new Managed Print Service which will be completed by July 2025.","startDate":"2016-02-29","endDate":null,"scheduleNarrative":"Section 26 - Defence","fyBaseline":60.93,"fyForecast":43.99,"fyVariance":27.8,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. This reflects a forecast under-spend against budget of £16.957M and is due to the revised delivery schedule for the OFFICIAL Tier.","wholeLifeCost":370.68,"costNarrative":"The project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) is 370.681 This is primarily due to the following factors. Departmental financial pressures have reduced the programme’s budget in FY 24/25 and FY 25/26.","benefits":431.99,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmental-agree monetised benefits at 24/25-Q4 remained at 0m","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Technical & integration"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 increased from RED to AMBER. This is primarily due to the following factors. The migration of all 200,000 Official Tier users worldwide to the new service is underway and will complete in the next financial year. The End User Services (SECRET) contract has been placed…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Section 26 - Defence","narrativeClaimKind":null},"ratingDelta":-1,"transition":"Improved","endDateDeltaDays":null,"attentionScore":13,"attentionReasons":["In-year forecast variance is +38.4%"]},{"id":"DWP_0304_2324-Q3","year":2026,"name":"Connect to Work","department":"DWP","category":"Government Transformation and Service Delivery","description":"Connect to work will deliver, through grant funding to Local Authorities , a national voluntary supported employment programme focused on helping disabled people, people with health conditions and people with additional barriers to employment into sustained work. Once fully rolled out across England and Wales, Connect to work is expected to support up to 100,000 people per year to enter or remain within sustained employment. It will do this by providing locally-based employment specialists, offering intensive/ personalised support based on proven Supported Employment models – Individual Placement and Support (IPS) and Supported Employment Quality Framework (SEQF).","ipaDca":"Green","sroDca":null,"deliveryConfidence":"Green","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 increased to GREEN. This is primarily due to the following factors‚ successful delivery of the programme appears highly likely and there are no major outstanding issues that at this stage appear to threaten transition to business as usual.","startDate":null,"endDate":"2026-03-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same, 31/03/2030. This is primarily due to the following factors‚ Grant Funding Agreements that have or are due to be put in place with Accountable Bodies, this end date refers to when the service is due to end, based on current plans and assumptions.","fyBaseline":87.8,"fyForecast":89.09,"fyVariance":1.47,"varianceNarrative":"The budget variance is less than or equal to 5%","wholeLifeCost":1094.99,"costNarrative":"Compared to the financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost (measured in £m) decreased to 1094.99 for 25/26-Q4 WLC. This is primarily due to a reduction in forecast grant cost due to differences between modelled estimates and agreed local delivery plans, along with changes to optimism bias assumptions.","benefits":2566.22,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits (measured in £m) increased to 2566.22 for 25/26-Q4. This is primarily due to moving to a more accurate approach to calculating benefits.","themes":["Cost & funding","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 increased to GREEN. This is primarily due to the following factors‚ successful delivery of the programme appears highly likely and there are no major outstanding issues that at this stage appear to threaten transition to business as usual. Compared to…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":true,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same, 31/03/2030. This is primarily due to the following factors‚ Grant Funding Agreements that have or are due to be put in place with Accountable Bodies, this end date refers to when the service is due to end, based on current plans and assumptions.","narrativeClaimKind":"date-mismatch","history":[{"id":"DWP_0304_2324-Q3","year":2025,"name":"Connect to Work","department":"DWP","category":"Government Transformation and Service Delivery","description":"Connect to work will deliver, through grant funding to Local Authorities , a national voluntary supported employment programme focused on helping disabled people, people with health conditions and people with additional barriers to employment into sustained work. Once fully rolled out across England and Wales, Connect to work is expected to support up to 100,000 people per year to enter or remain within sustained employment. It will do this by providing locally-based employment specialists, offering intensive/ personalised support based on proven Supported Employment models – Individual Placement and Support (IPS) and Supported Employment Quality Framework (SEQF).","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER. This is due to‚ West London Alliance was the first accountable body to start delivering Connect to Work on 28 April 2025. The majority of accountable bodies (AB's) have submitted delivery plans, all of which are currently under review by the appropriate panels. The Programme Business Case was approved by the Investment Committee on 29 April 2025, enabling progression to Treasury Approval Point which is scheduled for June 2025. Funding is secured for three years, after which further approvals will be required. Connect to Work continues to work with Job Centre Plus as more ABs begin implementation.","startDate":"2023-04-01","endDate":"2030-03-31","scheduleNarrative":"The project's end-date at 24/25-Q4 is scheduled to be 31/03/2030. This is primarily due to the following factors‚ Grant Funding Agreements that have or are due to be put in place with Accountable Bodies, this end date refers to when the service is due to end, based on current plans and assumptions.","fyBaseline":73.8,"fyForecast":68.9,"fyVariance":6.64,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ a pause in implementation due to general election.","wholeLifeCost":1373.8,"costNarrative":"The project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) is 1373. This is primarily due to the following factors‚ grant funding for local areas to deliver supported employment.","benefits":2293.7,"benefitsNarrative":"The project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) is 2293. This is primarily due to the following factors‚ AME savings and societal benefits. The benefits currently identified for the Connect to Work (CtW) programme were selected through a structured, evidence-informed process to ensure alignment with the Programme and DWP strategic intent and delivery objectives. These benefits are designed to reflect the programme’s core aim of supporting individuals with disabilities, long-term health conditions, or complex barriers into sustained employment.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER. This is due to‚ West London Alliance was the first accountable body to start delivering Connect to Work on 28 April 2025. The majority of accountable bodies (AB's) have submitted delivery plans, all of which are currently under review by the appropriate…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 24/25-Q4 is scheduled to be 31/03/2030. This is primarily due to the following factors‚ Grant Funding Agreements that have or are due to be put in place with Accountable Bodies, this end date refers to when the service is due to end, based on current plans and assumptions.","narrativeClaimKind":null},{"id":"DWP_0304_2324-Q3","year":2026,"name":"Connect to Work","department":"DWP","category":"Government Transformation and Service Delivery","description":"Connect to work will deliver, through grant funding to Local Authorities , a national voluntary supported employment programme focused on helping disabled people, people with health conditions and people with additional barriers to employment into sustained work. Once fully rolled out across England and Wales, Connect to work is expected to support up to 100,000 people per year to enter or remain within sustained employment. It will do this by providing locally-based employment specialists, offering intensive/ personalised support based on proven Supported Employment models – Individual Placement and Support (IPS) and Supported Employment Quality Framework (SEQF).","ipaDca":"Green","sroDca":null,"deliveryConfidence":"Green","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 increased to GREEN. This is primarily due to the following factors‚ successful delivery of the programme appears highly likely and there are no major outstanding issues that at this stage appear to threaten transition to business as usual.","startDate":null,"endDate":"2026-03-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same, 31/03/2030. This is primarily due to the following factors‚ Grant Funding Agreements that have or are due to be put in place with Accountable Bodies, this end date refers to when the service is due to end, based on current plans and assumptions.","fyBaseline":87.8,"fyForecast":89.09,"fyVariance":1.47,"varianceNarrative":"The budget variance is less than or equal to 5%","wholeLifeCost":1094.99,"costNarrative":"Compared to the financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost (measured in £m) decreased to 1094.99 for 25/26-Q4 WLC. This is primarily due to a reduction in forecast grant cost due to differences between modelled estimates and agreed local delivery plans, along with changes to optimism bias assumptions.","benefits":2566.22,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits (measured in £m) increased to 2566.22 for 25/26-Q4. This is primarily due to moving to a more accurate approach to calculating benefits.","themes":["Cost & funding","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 increased to GREEN. This is primarily due to the following factors‚ successful delivery of the programme appears highly likely and there are no major outstanding issues that at this stage appear to threaten transition to business as usual. Compared to…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":true,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same, 31/03/2030. This is primarily due to the following factors‚ Grant Funding Agreements that have or are due to be put in place with Accountable Bodies, this end date refers to when the service is due to end, based on current plans and assumptions.","narrativeClaimKind":"date-mismatch"}],"previous":{"id":"DWP_0304_2324-Q3","year":2025,"name":"Connect to Work","department":"DWP","category":"Government Transformation and Service Delivery","description":"Connect to work will deliver, through grant funding to Local Authorities , a national voluntary supported employment programme focused on helping disabled people, people with health conditions and people with additional barriers to employment into sustained work. Once fully rolled out across England and Wales, Connect to work is expected to support up to 100,000 people per year to enter or remain within sustained employment. It will do this by providing locally-based employment specialists, offering intensive/ personalised support based on proven Supported Employment models – Individual Placement and Support (IPS) and Supported Employment Quality Framework (SEQF).","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER. This is due to‚ West London Alliance was the first accountable body to start delivering Connect to Work on 28 April 2025. The majority of accountable bodies (AB's) have submitted delivery plans, all of which are currently under review by the appropriate panels. The Programme Business Case was approved by the Investment Committee on 29 April 2025, enabling progression to Treasury Approval Point which is scheduled for June 2025. Funding is secured for three years, after which further approvals will be required. Connect to Work continues to work with Job Centre Plus as more ABs begin implementation.","startDate":"2023-04-01","endDate":"2030-03-31","scheduleNarrative":"The project's end-date at 24/25-Q4 is scheduled to be 31/03/2030. This is primarily due to the following factors‚ Grant Funding Agreements that have or are due to be put in place with Accountable Bodies, this end date refers to when the service is due to end, based on current plans and assumptions.","fyBaseline":73.8,"fyForecast":68.9,"fyVariance":6.64,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ a pause in implementation due to general election.","wholeLifeCost":1373.8,"costNarrative":"The project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) is 1373. This is primarily due to the following factors‚ grant funding for local areas to deliver supported employment.","benefits":2293.7,"benefitsNarrative":"The project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) is 2293. This is primarily due to the following factors‚ AME savings and societal benefits. The benefits currently identified for the Connect to Work (CtW) programme were selected through a structured, evidence-informed process to ensure alignment with the Programme and DWP strategic intent and delivery objectives. These benefits are designed to reflect the programme’s core aim of supporting individuals with disabilities, long-term health conditions, or complex barriers into sustained employment.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER. This is due to‚ West London Alliance was the first accountable body to start delivering Connect to Work on 28 April 2025. The majority of accountable bodies (AB's) have submitted delivery plans, all of which are currently under review by the appropriate…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 24/25-Q4 is scheduled to be 31/03/2030. This is primarily due to the following factors‚ Grant Funding Agreements that have or are due to be put in place with Accountable Bodies, this end date refers to when the service is due to end, based on current plans and assumptions.","narrativeClaimKind":null},"ratingDelta":-1,"transition":"Improved","endDateDeltaDays":-1461,"attentionScore":12,"attentionReasons":["Published commentary says the end date is unchanged while the published date moved"]},{"id":"DFE_0495_2526-Q1","year":2026,"name":"Free Breakfast Clubs","department":"DFE","category":"Government Transformation and Service Delivery","description":"The government has committed to create a new mandatory free breakfast club duty for all state-funded schools with primary aged pupils on roll. Starting in April 2025, the Department for Education launched the first 750 free breakfast clubs in our early adopter schools. Offering places to nearly 180,000 children. Over the first year of delivery more than 8 million meals were served at the free breakfast clubs to pupils across the country, ensuring that they were fed and ready to start the day. In April 2026 the programme started it's national rollout with an additional 2,000 schools expected to begin delivering free breakfast clubs in the 2026/2027 financial year. Through funding schools to deliver free breakfast clubs, in line with future legislation, the objectives of the policy are to: ensure children are ready to learn at the start of the school day, improving their ability to achieve by giving children a soft start to the school day through a club and breakfast increase household incomes by reducing the amount families spend on groceries and before-school childcare and contributing to an increase in parents’ and carers’ ability to work more hours Establishing a free breakfast club in every primary school was a manifesto commitment. It supports the government’s opportunity and growth missions, specifically the every child achieving and thriving pillar.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 35 - Formulation of government policy","startDate":null,"endDate":null,"scheduleNarrative":"There have been no changes to the projects schedule.","fyBaseline":35.0,"fyForecast":35.0,"fyVariance":35.0,"varianceNarrative":"Exempt under Section 35 – Formulation of government policy","wholeLifeCost":null,"costNarrative":"Exempt under Section 35 - Formulation of government policy","benefits":null,"benefitsNarrative":"Exempt under Section 35 - Formulation of government policy","themes":["Delivery & schedule"],"evidenceExcerpt":"Exempt under Section 35 - Formulation of government policy There have been no changes to the projects schedule.","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"There have been no changes to the projects schedule.","narrativeClaimKind":null,"history":[{"id":"DFE_0495_2526-Q1","year":2026,"name":"Free Breakfast Clubs","department":"DFE","category":"Government Transformation and Service Delivery","description":"The government has committed to create a new mandatory free breakfast club duty for all state-funded schools with primary aged pupils on roll. Starting in April 2025, the Department for Education launched the first 750 free breakfast clubs in our early adopter schools. Offering places to nearly 180,000 children. Over the first year of delivery more than 8 million meals were served at the free breakfast clubs to pupils across the country, ensuring that they were fed and ready to start the day. In April 2026 the programme started it's national rollout with an additional 2,000 schools expected to begin delivering free breakfast clubs in the 2026/2027 financial year. Through funding schools to deliver free breakfast clubs, in line with future legislation, the objectives of the policy are to: ensure children are ready to learn at the start of the school day, improving their ability to achieve by giving children a soft start to the school day through a club and breakfast increase household incomes by reducing the amount families spend on groceries and before-school childcare and contributing to an increase in parents’ and carers’ ability to work more hours Establishing a free breakfast club in every primary school was a manifesto commitment. It supports the government’s opportunity and growth missions, specifically the every child achieving and thriving pillar.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 35 - Formulation of government policy","startDate":null,"endDate":null,"scheduleNarrative":"There have been no changes to the projects schedule.","fyBaseline":35.0,"fyForecast":35.0,"fyVariance":35.0,"varianceNarrative":"Exempt under Section 35 – Formulation of government policy","wholeLifeCost":null,"costNarrative":"Exempt under Section 35 - Formulation of government policy","benefits":null,"benefitsNarrative":"Exempt under Section 35 - Formulation of government policy","themes":["Delivery & schedule"],"evidenceExcerpt":"Exempt under Section 35 - Formulation of government policy There have been no changes to the projects schedule.","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"There have been no changes to the projects schedule.","narrativeClaimKind":null}],"previous":null,"ratingDelta":null,"transition":"Not comparable","endDateDeltaDays":null,"attentionScore":12,"attentionReasons":["In-year forecast variance is +35.0%"]},{"id":"MOJ_0060_2122-Q3","year":2026,"name":"PFI Prison Expiry and Transfer Tranche 2","department":"MOJ","category":"Government Transformation and Service Delivery","description":"The aim of this project is to carry out the exit and transfer of services at HMP Ashfield and Forest Bank in a safe, effective and efficient manner following the expiry of their PFI contracts. HMPPS needs to undertake essential work to ensure it is able to manage the expiry of the Project Agreements and transfer the service, while maintaining continuity so there is no disruption to the regime or capacity at the prisons and also ensure opportunities to modernise the sites and align service provision to future need is fully considered. The project scope also includes delivering 458 additional prison places through the Rye Hill houseblock delivery. Project scope change approval was received in March 2026 to transfer the remaining HMP Rye Hill activity competition re-run to a later Tranche.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25-Q4, the NISTA Delivery Confidence Assessment (DCA) rating at 25/26-Q4 has increased from Amber to Green. This is primarily due to the ​agreement to move the remaining HMP Rye Hill operator competition to a later tranche, meaning the remaining delivery is now approaching completion following the successful transfer of services and exit of the existing PFI contracts at HMPs Ashfield and Forest Bank and the delivery of HMP Rye Hill Houseblock expansion.","startDate":"2022-01-22","endDate":"2026-07-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project at 25/26-Q4 remains scheduled to finished on 31/10/26. The project is on track to deliver against the baseline schedule following the transfer of remaining HMP Rye Hill activity to a later Tranche.","fyBaseline":86.12,"fyForecast":88.7,"fyVariance":3.0,"varianceNarrative":"The budget variance is less or equal to 5%.","wholeLifeCost":2730.04,"costNarrative":"The HMT-agreed Whole Life Cost for 25/26-Q4 has decreased from £3,862.165m to £2,730.04m. All costs have been reported in 2024/25 base prices in line with NISTA requirements. This is a change from previous years where costs were reported in nominal prices. All costs reflect this accounting reduction regardless of any actual changes.","benefits":null,"benefitsNarrative":"This project currently reports no monetised benefits. The project seeks to realise efficiencies in future operating costs following the transfer of service to new operator contracts when compared to the PFI contracts. The project benefits also include the focus on the continued quality of service across the PFI contracts until expiry, and following the transfer of service, improvements in service quality in the new contract in line with the key Departmental priorities.","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 24/25-Q4, the NISTA Delivery Confidence Assessment (DCA) rating at 25/26-Q4 has increased from Amber to Green. This is primarily due to the ​agreement to move the remaining HMP Rye Hill operator competition to a later tranche, meaning the remaining delivery is now approaching completion following the successful transfer of…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":true,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project at 25/26-Q4 remains scheduled to finished on 31/10/26. The project is on track to deliver against the baseline schedule following the transfer of remaining HMP Rye Hill activity to a later Tranche.","narrativeClaimKind":"date-mismatch","history":[{"id":"MOJ_0060_2122-Q3","year":2023,"name":"PFI Prison Expiry and Transfer Tranche 2","department":"MOJ","category":"Government Transformation and Service Delivery","description":"The aim of this project is to carry out the exit and transfer of services at HMP Ashfield, Forest Bank and Rye Hill in a safe, effective and efficient manner following the expiry of their PFI contracts between Q3 2023 and Q4 2025. HMPPS is undertaking essential work to ensure it is able to manage the expiry of the Project Agreements and transfer the service, while maintaining regime continuity and to ensure opportunities to modernise the sites and align service provision to future needs are fully considered","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 is Amber. This is primarily due to the following factors. This is the first time data has been published for this project, which has been added to GMPP over the last year.The Amber assessment is due to inherent risk in the project's timelines.","startDate":"2022-01-22","endDate":"2026-07-31","scheduleNarrative":"The project's end-date at 22/23-Q4 is 2026-07-31. This is primarily due to the following factors. The project is on track against the baseline schedule.","fyBaseline":0.0,"fyForecast":0.91,"fyVariance":null,"varianceNarrative":"Variance is less than 5%, so no narrative required","wholeLifeCost":1544.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 22/23-Q4 is 1544m. This is primarily due to the following factors. The Whole Life Costs includecosts of operating the three prisons andexpected capital costs.","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This project currently reports no monetised benefits. The project expects to realise efficiencies in future operating costs following the transfer of service to new operator contracts when compared to the PFI contracts. The project benefits also include the focus on the continued quality of service across the PFI contracts until expiry, and following the transfer of service, improvements in service quality in the new contract in line with the key priorities set out in the Prison Strategy White Paper.","themes":["Cost & funding","Delivery & schedule","Technical & integration"],"evidenceExcerpt":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 is Amber. This is primarily due to the following factors. This is the first time data has been published for this project, which has been added to GMPP over the last year.The Amber assessment is due to inherent risk in the project's timelines. The project's end-date at 22/23-Q4…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 22/23-Q4 is 2026-07-31. This is primarily due to the following factors. The project is on track against the baseline schedule.","narrativeClaimKind":null},{"id":"MOJ_0060_2122-Q3","year":2024,"name":"PFI Prison Expiry and Transfer Tranche 2","department":"MOJ","category":"Government Transformation and Service Delivery","description":"The aim of this project is to carry out the exit and transfer of services at HMP Ashfield, Forest Bank and Rye Hill in a safe, effective and efficient manner following the expiry of their PFI contracts. HMPPS needs to undertake essential work to ensure it is able to manage the expiry of the Project Agreements and transfer the service, while maintaining continuity so there is no disruption to the regime or capacity at the prisons and also ensure opportunities to modernise the sites and align service provision to future need is fully considered. Following a change in 23/24-Q4 the project scope also includes the expansion of HMP Rye Hill through the construction of an additional houseblock at the prison.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The limited contingency and complexity of the expiry and transfer activities still to be delivered.","startDate":"2022-01-22","endDate":"2026-07-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2026-07-31. This is primarily due to the following factors. The project is on track to deliver against the baseline schedule.","fyBaseline":16.46,"fyForecast":48.66,"fyVariance":196.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The overspend is due to previous changes in the delivery plan, requiring some costs to be re-profiled into this financial year.","wholeLifeCost":4347.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 increased from 1544m. to 4347m. This is primarily due to the following factors. The expansion of the project scope following the addition of the Rye Hill Houseblock Expansion from the Houseblocks and Refurbishments Programme.","benefits":0.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 0m. This project currently reports no monetised benefits. The project seeks to realise efficiencies in future operating costs following the transfer of service to new operator contracts when compared to the PFI contracts. The project benefits also include the focus on the continued quality of service across the PFI contracts until expiry, and following the transfer of service, improvements in service quality in the new contract in line with the key priorities set out in the Prison Strategy White Paper and MoJ Outcome Delivery Plan.","themes":["Cost & funding","Delivery & schedule","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The limited contingency and complexity of the expiry and transfer activities still to be delivered. Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2026-07-31. This is primarily due to the following factors. The project is on track to deliver against the baseline schedule.","narrativeClaimKind":null},{"id":"MOJ_0060_2122-Q3","year":2025,"name":"PFI Prison Expiry and Transfer Tranche 2","department":"MoJ","category":"Government Transformation and Service Delivery","description":"The aim of this project is to carry out the exit and transfer of services at HMP Ashfield, Forest Bank and Rye Hill in a safe, effective and efficient manner following the expiry of their PFI contracts. HMPPS needs to undertake essential work to ensure it is able to manage the expiry of the Project Agreements and transfer the service, while maintaining continuity so there is no disruption to the regime or capacity at the prisons and also ensure opportunities to modernise the sites and align service provision to future need is fully considered. Following a change in 23/24-Q4 the project scope also includes the expansion of HMP Rye Hill through the construction of an additional houseblock at the prison.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Limited contingency and the complexity of the expiry and transfer activities still to be delivered.","startDate":"2022-01-22","endDate":"2026-10-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/07/2026 to 31/10/2026. This is primarily due to the following factors‚ The project has re-baselined its schedule having applied lessons learned from the PFI Tranche 1 project.","fyBaseline":41.3,"fyForecast":67.71,"fyVariance":63.94,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The overspend is due to previous changes in the delivery plan, requiring some costs to be re-profiled into this financial year.","wholeLifeCost":3862.16,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 4347 to 3862. This is primarily due to the following factors‚ The decrease is due to a correction of modelled costs for the additional houseblock at HMP Rye Hill.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ This project currently reports no monetised benefits. The project seeks to realise efficiencies in future operating costs following the transfer of service to new operator contracts when compared to the PFI contracts. The project benefits also include the focus on the continued quality of service across the PFI contracts until expiry, and following the transfer of service, improvements in service quality in the new contract in line with the key Departmental priorities.","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Limited contingency and the complexity of the expiry and transfer activities still to be delivered. Compared to financial year 23/24-Q4, the project's end-date at…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/07/2026 to 31/10/2026. This is primarily due to the following factors‚ The project has re-baselined its schedule having applied lessons learned from the PFI Tranche 1 project.","narrativeClaimKind":null},{"id":"MOJ_0060_2122-Q3","year":2026,"name":"PFI Prison Expiry and Transfer Tranche 2","department":"MOJ","category":"Government Transformation and Service Delivery","description":"The aim of this project is to carry out the exit and transfer of services at HMP Ashfield and Forest Bank in a safe, effective and efficient manner following the expiry of their PFI contracts. HMPPS needs to undertake essential work to ensure it is able to manage the expiry of the Project Agreements and transfer the service, while maintaining continuity so there is no disruption to the regime or capacity at the prisons and also ensure opportunities to modernise the sites and align service provision to future need is fully considered. The project scope also includes delivering 458 additional prison places through the Rye Hill houseblock delivery. Project scope change approval was received in March 2026 to transfer the remaining HMP Rye Hill activity competition re-run to a later Tranche.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25-Q4, the NISTA Delivery Confidence Assessment (DCA) rating at 25/26-Q4 has increased from Amber to Green. This is primarily due to the ​agreement to move the remaining HMP Rye Hill operator competition to a later tranche, meaning the remaining delivery is now approaching completion following the successful transfer of services and exit of the existing PFI contracts at HMPs Ashfield and Forest Bank and the delivery of HMP Rye Hill Houseblock expansion.","startDate":"2022-01-22","endDate":"2026-07-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project at 25/26-Q4 remains scheduled to finished on 31/10/26. The project is on track to deliver against the baseline schedule following the transfer of remaining HMP Rye Hill activity to a later Tranche.","fyBaseline":86.12,"fyForecast":88.7,"fyVariance":3.0,"varianceNarrative":"The budget variance is less or equal to 5%.","wholeLifeCost":2730.04,"costNarrative":"The HMT-agreed Whole Life Cost for 25/26-Q4 has decreased from £3,862.165m to £2,730.04m. All costs have been reported in 2024/25 base prices in line with NISTA requirements. This is a change from previous years where costs were reported in nominal prices. All costs reflect this accounting reduction regardless of any actual changes.","benefits":null,"benefitsNarrative":"This project currently reports no monetised benefits. The project seeks to realise efficiencies in future operating costs following the transfer of service to new operator contracts when compared to the PFI contracts. The project benefits also include the focus on the continued quality of service across the PFI contracts until expiry, and following the transfer of service, improvements in service quality in the new contract in line with the key Departmental priorities.","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 24/25-Q4, the NISTA Delivery Confidence Assessment (DCA) rating at 25/26-Q4 has increased from Amber to Green. This is primarily due to the ​agreement to move the remaining HMP Rye Hill operator competition to a later tranche, meaning the remaining delivery is now approaching completion following the successful transfer of…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":true,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project at 25/26-Q4 remains scheduled to finished on 31/10/26. The project is on track to deliver against the baseline schedule following the transfer of remaining HMP Rye Hill activity to a later Tranche.","narrativeClaimKind":"date-mismatch"}],"previous":{"id":"MOJ_0060_2122-Q3","year":2025,"name":"PFI Prison Expiry and Transfer Tranche 2","department":"MoJ","category":"Government Transformation and Service Delivery","description":"The aim of this project is to carry out the exit and transfer of services at HMP Ashfield, Forest Bank and Rye Hill in a safe, effective and efficient manner following the expiry of their PFI contracts. HMPPS needs to undertake essential work to ensure it is able to manage the expiry of the Project Agreements and transfer the service, while maintaining continuity so there is no disruption to the regime or capacity at the prisons and also ensure opportunities to modernise the sites and align service provision to future need is fully considered. Following a change in 23/24-Q4 the project scope also includes the expansion of HMP Rye Hill through the construction of an additional houseblock at the prison.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Limited contingency and the complexity of the expiry and transfer activities still to be delivered.","startDate":"2022-01-22","endDate":"2026-10-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/07/2026 to 31/10/2026. This is primarily due to the following factors‚ The project has re-baselined its schedule having applied lessons learned from the PFI Tranche 1 project.","fyBaseline":41.3,"fyForecast":67.71,"fyVariance":63.94,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The overspend is due to previous changes in the delivery plan, requiring some costs to be re-profiled into this financial year.","wholeLifeCost":3862.16,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 4347 to 3862. This is primarily due to the following factors‚ The decrease is due to a correction of modelled costs for the additional houseblock at HMP Rye Hill.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ This project currently reports no monetised benefits. The project seeks to realise efficiencies in future operating costs following the transfer of service to new operator contracts when compared to the PFI contracts. The project benefits also include the focus on the continued quality of service across the PFI contracts until expiry, and following the transfer of service, improvements in service quality in the new contract in line with the key Departmental priorities.","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Limited contingency and the complexity of the expiry and transfer activities still to be delivered. Compared to financial year 23/24-Q4, the project's end-date at…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/07/2026 to 31/10/2026. This is primarily due to the following factors‚ The project has re-baselined its schedule having applied lessons learned from the PFI Tranche 1 project.","narrativeClaimKind":null},"ratingDelta":-1,"transition":"Improved","endDateDeltaDays":-92,"attentionScore":12,"attentionReasons":["Published commentary says the end date is unchanged while the published date moved"]},{"id":"DOH_0017_1112-Q1","year":2026,"name":"UK Health Security Campus","department":"DHSC","category":"Infrastructure and Construction","description":"Exempt under Section 35 - Formulation of government policy","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 35 - Formulation of government policy","startDate":null,"endDate":null,"scheduleNarrative":"Exempt under Section 35 - Formulation of government policy","fyBaseline":35.0,"fyForecast":35.0,"fyVariance":35.0,"varianceNarrative":"Exempt under Section 35 – Formulation of government policy","wholeLifeCost":null,"costNarrative":"Exempt under Section 35 - Formulation of government policy","benefits":null,"benefitsNarrative":"Exempt under Section 35 - Formulation of government policy","themes":[],"evidenceExcerpt":"Exempt under Section 35 - Formulation of government policy Exempt under Section 35 - Formulation of government policy","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 35 - Formulation of government policy","narrativeClaimKind":null,"history":[{"id":"DOH_0017_1112-Q1","year":2021,"name":"PHE Science Hub","department":"DHSC","category":"Infrastructure and Construction","description":"To create a state-of-the-art campus for applied public health science, as a platform for future generations of national and international scientific expertise, and help enable the transformation UK health protection and security.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber/red. This is primarily due to the following factors: Following Spending Review 2020, a review of the Programme Business Case (PBC) has been initiated with HMT and DHSC. This will take into account factors arising since the PBC was submitted - the creation of UK Health Security Agency and lessons identified from the COVID-19 response. The programme team is working closely with the UKHSA operating model design team to ensure alignment. Site works continue with funding for 2020-21.","startDate":"2013-06-28","endDate":"2025-06-30","scheduleNarrative":"Compared to financial year 19/20-Q2, the project's end-date remained scheduled to finish on 30 June 2025 . This is primarily due to the following factors: The PBC was submitted in December 2019 and was approved in principle at the Major Project Review Group in July 2020 subject to Spending Review conditions. The SR condition specified a review of the OBC options to ensure the robustness of the options appraisal.","fyBaseline":464.03,"fyForecast":262.92,"fyVariance":-43.0,"varianceNarrative":"The budget variance exceeds 5%. New Capital DEL expenditure reflects delays in letting main works contracts originally planned for 20/21.","wholeLifeCost":2656.34,"costNarrative":"Compared to financial year 19/20-Q2, the projects Baseline Whole Life Cost increased from �2656.32m to �2656.34m. This is primarily due to the following factors: Outturn cost projections remain consistent across both years with a only a minor change in WLC values","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Governance & assurance","Approvals & decisions","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber/red. This is primarily due to the following factors: Following Spending Review 2020, a review of the Programme Business Case (PBC) has been initiated with HMT and DHSC. This will take into account factors arising since the PBC…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 19/20-Q2, the project's end-date remained scheduled to finish on 30 June 2025 . This is primarily due to the following factors: The PBC was submitted in December 2019 and was approved in principle at the Major Project Review Group in July 2020 subject to Spending Review conditions. The SR condition specified a review of the OBC options to ensure the robustness of the options appraisal.","narrativeClaimKind":null},{"id":"DOH_0017_1112-Q1","year":2022,"name":"PHE Science Hub","department":"DHSC","category":"Infrastructure and Construction","description":"The Science Hub programme aims to create a state-of-the-art, integrated public health campus which will bring together scientific expertise to reduce health inequalities and strengthen public health security through co-location of ageing facilities at Porton and Colindale and some London functions at a new Science Campus in Harlow, Essex. On 1st October 2021, this programme transitioned from PHE to the new UK Health Security Agency.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 decreased from Amber/red to Amber. Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 decreased from Red to Amber The Programme's Capital provision for 2022/23 has been reduced significantly in the light of Departmental funding prioritisation. This has required the Programme to slow activity and stand down the majority of suppliers. This will further delay the programme schedule and change the cost and risk profiles. Work has progressed with suppliers to agree demobilisations, close-out contracts and assure and agree commercial positions. In parallel, work has developed to agree and prioritise 2022/23 activities to complete elements of construction works, protect design integrity and ensure site safety and security. These activities, combined with Programme Business Case development, requirements definition & refinement, and programme re-configuration will position the programme for the best possible ramp-up in 2023/24.","startDate":"2013-06-28","endDate":"2025-06-30","scheduleNarrative":"Compared to 2021-Q4, your project end-date remained scheduled to finish on 30 JUN 2025 . This is primarily due to the following factors: The programme end date will move to beyond 2031/2032. The actual forecast end-date will be clearer with programme business case approval for funding for future years. A variety of factors have caused the schedule to extend including: delay in programme funding approvals; COVID and the transition to UKHSA; significant changes to capital profile post SR21.","fyBaseline":309.02,"fyForecast":284.39,"fyVariance":-8.0,"varianceNarrative":"The budget variance exceeds 5%. Construction contracts could not be awarded given delays to business case approval and extension of the pre-construction period. The Programme has moved substantially beyond the baseline budget and schedule and the cost variance reflects this.","wholeLifeCost":2656.0,"costNarrative":"Compared to 2021-Q4,the projects Baseline Whole Life Cost remained at 2656.34 (£m). This is primarily due to the following factors: Rebaselining will occur following approval of the Programme Business case by the end of FY 22/23","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 decreased from Amber/red to Amber. Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 decreased from Red to Amber The Programme's Capital provision for…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to 2021-Q4, your project end-date remained scheduled to finish on 30 JUN 2025 . This is primarily due to the following factors: The programme end date will move to beyond 2031/2032. The actual forecast end-date will be clearer with programme business case approval for funding for future years. A variety of factors have caused the schedule to extend including: delay in programme funding approvals; COVID and the transition to UKHSA; significant changes to capital profile post SR21.","narrativeClaimKind":null},{"id":"DOH_0017_1112-Q1","year":2023,"name":"PHE Science Hub","department":"DHSC","category":"Infrastructure and Construction","description":"The UK Health Security Agency Science Hub Programme aims to create a health security campus to provide the UK's leading science centre of excellence. Re-providing and enhancing ageing facilities at Porton and Colindale to bring together expertise from world-leading academic and commercial institutions to protect the public's health security and reduce health inequalities.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Red. This is primarily due to the following factors. Ministers recognise the need for UKHSA to replace its ageing infrastructure to support the continued delivery of it's core mission to protect public health security. Given the scale of investment required, UKHSA is considering further alternative options that may be available, including investing in existing sites, in addition to the current Harlow plan. In the meantime the programme remains focused on validating designs and requirements; and re-framing delivery options, plans and spending approvals in line with further work needed ahead of the Programme Business Case (PBC) submission and approval.","startDate":"2013-06-28","endDate":"2034-10-20","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 increased from 2025-06-30 to 2034-10-20. This is primarily due to the following factors. The programme schedule has been extended in line with successive funding changes requiring activity to be prioritised and the majority of suppliers demobilised. Following steers from Ministers, the Programme Business Case will be developed further and the programme will be re-baselined. If PBC approval is gained in 2023/24 the completion date for the programme would likely now move out to beyond 2035.","fyBaseline":205.33,"fyForecast":300.51,"fyVariance":46.0,"varianceNarrative":"The budget variance exceeds 5%. The data for the budget and forecast shown are based on figures provided in the June 2020 PBC which will be superseded. Successive changes to budgets have amended the schedule with consequential impact on forecasts.","wholeLifeCost":2656.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 remained at 2656m. This is primarily due to the following factors. Programme business case development, assurance and approvals planning will be re-set in line with the updated programme schedule and budget. The expected whole life cost will be re-baselined following approval of the Programme Business Case.","benefits":8250.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 8250m. The project's departmental-agree monetised benefits at 22/23-Q4 is 8250m.The project's departmental-agree monetised benefits at 22/23-Q4 is 8250m.The project's departmental-agree monetised benefits at 22/23-Q4 is 8250m. Benefits included in the current case relate to Health Economic QALYs driven by the collaboration and consolidated science and health security capabilities on a single site. Cost savings generated from the programme are netted against operating costs in the case.Following further work on options, any changes to the programmes planned scope will require a refresh of the Benefits Narrative and review of the benefits being delivered.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Red. This is primarily due to the following factors. Ministers recognise the need for UKHSA to replace its ageing infrastructure to support the continued delivery of it's core mission to protect public health security.…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 increased from 2025-06-30 to 2034-10-20. This is primarily due to the following factors. The programme schedule has been extended in line with successive funding changes requiring activity to be prioritised and the majority of suppliers demobilised. Following steers from Ministers, the Programme Business Case will be developed further and the programme will be re-baselined. If PBC approval is gained in 2023/24 the completion date for the programme would likely now move out to beyond 2035.","narrativeClaimKind":null},{"id":"DOH_0017_1112-Q1","year":2024,"name":"PHE Science Hub","department":"DHSC","category":"Infrastructure and Construction","description":"The UKHSA Health Security Campus Programme aims to create the UKs leading science centre of excellence. It will replace the ageing facilities at Porton and Colindale and bring together expertise from world-leading academic and commercial institutions to protect the public's health security and reduce health inequalities.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Red. This is primarily due to the following factors. The future plans for the Science Hub will be confirmed by Ministers after the election, and funding confirmed in the subsequent Spending Review","startDate":"2013-06-28","endDate":null,"scheduleNarrative":"ARMP adjustments - Project not yet in a position to give cost/schedule","fyBaseline":0.0,"fyForecast":0.0,"fyVariance":null,"varianceNarrative":"ARMP adjustments - Project not yet in a position to give cost/schedule","wholeLifeCost":null,"costNarrative":"ARMP adjustments - Project not yet in a position to give cost/schedule","benefits":null,"benefitsNarrative":"ARMP adjustments - Project not yet in a position to give cost/schedule","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Red. This is primarily due to the following factors. The future plans for the Science Hub will be confirmed by Ministers after the election, and funding confirmed in the subsequent Spending Review ARMP adjustments -…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"ARMP adjustments - Project not yet in a position to give cost/schedule","narrativeClaimKind":null},{"id":"DOH_0017_1112-Q1","year":2025,"name":"PHE SCIENCE HUB","department":"DHSC","category":"Infrastructure and Construction","description":"Section 35 - Formulation of government policy","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Section 35 - Formulation of government policy","startDate":null,"endDate":null,"scheduleNarrative":"Section 35 - Formulation of government policy","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 35 - Formulation of government policy","wholeLifeCost":null,"costNarrative":"Section 35 - Formulation of government policy","benefits":null,"benefitsNarrative":"Section 35 - Formulation of government policy","themes":[],"evidenceExcerpt":"Section 35 - Formulation of government policy Section 35 - Formulation of government policy","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Section 35 - Formulation of government policy","narrativeClaimKind":null},{"id":"DOH_0017_1112-Q1","year":2026,"name":"UK Health Security Campus","department":"DHSC","category":"Infrastructure and Construction","description":"Exempt under Section 35 - Formulation of government policy","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 35 - Formulation of government policy","startDate":null,"endDate":null,"scheduleNarrative":"Exempt under Section 35 - Formulation of government policy","fyBaseline":35.0,"fyForecast":35.0,"fyVariance":35.0,"varianceNarrative":"Exempt under Section 35 – Formulation of government policy","wholeLifeCost":null,"costNarrative":"Exempt under Section 35 - Formulation of government policy","benefits":null,"benefitsNarrative":"Exempt under Section 35 - Formulation of government policy","themes":[],"evidenceExcerpt":"Exempt under Section 35 - Formulation of government policy Exempt under Section 35 - Formulation of government policy","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 35 - Formulation of government policy","narrativeClaimKind":null}],"previous":{"id":"DOH_0017_1112-Q1","year":2025,"name":"PHE SCIENCE HUB","department":"DHSC","category":"Infrastructure and Construction","description":"Section 35 - Formulation of government policy","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Section 35 - Formulation of government policy","startDate":null,"endDate":null,"scheduleNarrative":"Section 35 - Formulation of government policy","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 35 - Formulation of government policy","wholeLifeCost":null,"costNarrative":"Section 35 - Formulation of government policy","benefits":null,"benefitsNarrative":"Section 35 - Formulation of government policy","themes":[],"evidenceExcerpt":"Section 35 - Formulation of government policy Section 35 - Formulation of government policy","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Section 35 - Formulation of government policy","narrativeClaimKind":null},"ratingDelta":null,"transition":"Not comparable","endDateDeltaDays":null,"attentionScore":12,"attentionReasons":["In-year forecast variance is +35.0%"]},{"id":"DEFRA_0007_2021-Q1","year":2026,"name":"National Biosecurity Centre (Weybridge)","department":"DEFRA","category":"Infrastructure and Construction","description":"The National Biosecurity Centre Programme is transforming the Animal & Plant Health Agency (APHA) Weybridge site, delivering a state-of-the-art National Biosecurity Centre facility to future proof the UK’s ability to provide essential research, surveillance and outbreak response for a range of animal pathogens, some of which are a threat to humans. It will support UK trade, our food and farming sectors, protect economic growth and the prosperity of the nation.","ipaDca":"Green","sroDca":null,"deliveryConfidence":"Green","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 increased to GREEN. This reflects the positive progress made over the past 12 months and robustness of arrangements in place which give confidence in the deliverability of the Programme, as evidenced by the GREEN rating achieved through the NISTA Gate 0 Review in March.","startDate":"2021-04-01","endDate":"2036-09-30","scheduleNarrative":"Compared to financial year 24/25-Q4, the Programme's end-date at 25/26-Q4 remained the same at 30 Sep 2036. This is primarily due to the continued progress made towards developing designs for the future science buildings and preparing the site for the start of their construction in 2027. All critical enabling works are now in contract and works on site are ramping up. A Main Works Contractor for the new science buildings has been appointed, and RIBA 3 designs have been approved. The Programme remains a priority for Defra.","fyBaseline":128.73,"fyForecast":85.42,"fyVariance":33.64,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the timing of some enabling and infrastructure works moving to the right to prioritise critical activities, and an extension of science hub design development timescales to ensure appropriate quality prior to transferring design responsibility to the Main Works contractor. Deferred spend has been re-forecast within future FYs.","wholeLifeCost":2485.6,"costNarrative":"Compared to financial year 24/25-Q4, the Programme’s departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) remained at £2,820M. This is primarily due to continued progress in line with the scope and assumptions that underpin the Programme Business Case approved in December 2024.","benefits":10131.06,"benefitsNarrative":"Compared to financial year 24/25-Q4, the Programme’s departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at £16,216M. This is primarily due to the benefits identified within the approved Programme Business Case remaining unchanged.","themes":["Cost & funding","Delivery & schedule","Scope & requirements","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 increased to GREEN. This reflects the positive progress made over the past 12 months and robustness of arrangements in place which give confidence in the deliverability of the Programme, as evidenced by the GREEN rating achieved through the NISTA Gate…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the Programme's end-date at 25/26-Q4 remained the same at 30 Sep 2036. This is primarily due to the continued progress made towards developing designs for the future science buildings and preparing the site for the start of their construction in 2027. All critical enabling works are now in contract and works on site are ramping up. A Main Works Contractor for the new science buildings has been appointed, and RIBA 3 designs have been approved. The Programme remains a priority for Defra.","narrativeClaimKind":null,"history":[{"id":"DEFRA_0007_2021-Q1","year":2021,"name":"Science Capability in Animal Health Programme","department":"DEFRA","category":"Infrastructure and Construction","description":"The SCAH Programme sets out the Department for Environment, Food and Rural Affairs' (Defra's) plans for long-term investment in the Government's main animal health science facility. The re-development of the site infrastructure and associated transformation programme will secure and safeguard the critical animal health science capability, protecting the nation from the impacts of animal diseases in a cost effective way.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber/red.This is primarily due to the following factors: Delivery Confidence is Amber-Red due to the likelihood of Programme cost exceeding its March 2020 budget allocation following development of more detailed plans for the new Science Hub. A new Programme Business Case, informed by a more comprehensive view of the change requirement, will form the basis for a re-baseline of cost, benefits and schedule. IPA validated this as a credible pathway to Green in December 2020.","startDate":"2018-02-05","endDate":"2029-06-30","scheduleNarrative":"The project end-date is 30 June 2029. This is primarily due to the following factors: A new schedule for the Programme Business Case will be informed by a more detailed understanding of the scheme requirements.","fyBaseline":38.0,"fyForecast":15.7,"fyVariance":-59.0,"varianceNarrative":"The budget variance exceeds 5%. The programme budget is expected to be in variance to the Outline Business Case baseline over its lifetime, which formed the basis of the Budget 2020 allocation.","wholeLifeCost":1509.0,"costNarrative":"The projects Baseline Whole Life Cost is �1508.99m. This is primarily due to the following factors: The Project Whole Life costs is being updated and re-baselined as part of the Programme Business Case.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Scope & requirements"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber/red.This is primarily due to the following factors: Delivery Confidence is Amber-Red due to the likelihood of Programme cost exceeding its March 2020 budget allocation following development of more detailed plans for the new Science Hub. A new Programme Business Case,…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project end-date is 30 June 2029. This is primarily due to the following factors: A new schedule for the Programme Business Case will be informed by a more detailed understanding of the scheme requirements.","narrativeClaimKind":null},{"id":"DEFRA_0007_2021-Q1","year":2022,"name":"Science Capability in Animal Health Programme","department":"DEFRA","category":"Infrastructure and Construction","description":"The SCAH Programme sets out the Department for Environment, Food and Rural Affairs' (Defra) plans for long-term investment in the Government's main animal health science facility. The re-development of the site infrastructure and associated transformation programme will secure and safeguard the critical animal health science capability, protecting the nation from the impacts of animal diseases in a cost effective way.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 decreased from Amber/red to Amber The programme is in the process of defining key deliverables and the approach to their delivery. As such no overarching programme-level Internal Quality Assurance has been undertaken. Realtime assurance is provided by the GIAA at the programme's Integration Board, which oversees and manages the integration and phasing of capital, transformation and science capability activities on a fortnightly basis. The GIAA provided a Moderate assurance opinion for 2021/22. Delivery confidence is AMBER due to the acceptance of a revised Business Case in late 2021, which enables the programme to make progress with delivery. HMT confirmed the allocation of the £200m investment in the SR21, and work has now started on site. During the first phase of delivery, core assumptions will be tested to optimise the delivery plan, professional services procurements will progress and the design for the main science facilities will be matured: these will inform a further business case in Spring 2024.","startDate":"2021-04-01","endDate":"2036-09-30","scheduleNarrative":"Compared to 2021-Q4, your project end-date increased from 30 JUN 2029 to 30 SEP 2036 . This is primarily due to the following factors: The revised schedule reflects the more mature scheme design underpinning the 2021 business case.","fyBaseline":19.81,"fyForecast":19.1,"fyVariance":-4.0,"varianceNarrative":"The SCAH spend for 21/22 reflects the revised profile of spend now included in the Programme Business Case and aligned to the SR settlement, rather than the higher spend in the earlier SR20.","wholeLifeCost":2820.0,"costNarrative":"Compared to2021-Q4, the projects Baseline Whole Life Cost increased from 1508.99 (£m) to 2820.20 (£m). This is primarily due to the following factors: Compared to 2021-Q4, the project estimated Whole Life Cost changed to 2820.20 (£m). This reflects increased design maturity, more in-depth benchmarking against equivalent scheme, more cautious risk and Optimism Bias, increased programme length due to more detailed scheduling of the transition steps required, and the addition of elements not previously included, in particular science and digital transformation as well as new requirements around sustainability.","benefits":null,"benefitsNarrative":"","themes":["Delivery & schedule","Cost & funding","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 decreased from Amber/red to Amber The programme is in the process of defining key deliverables and the approach to their delivery. As such no overarching programme-level Internal Quality Assurance has been undertaken. Realtime…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to 2021-Q4, your project end-date increased from 30 JUN 2029 to 30 SEP 2036 . This is primarily due to the following factors: The revised schedule reflects the more mature scheme design underpinning the 2021 business case.","narrativeClaimKind":null},{"id":"DEFRA_0007_2021-Q1","year":2023,"name":"Science Capability in Animal Health Programme","department":"DEFRA","category":"Infrastructure and Construction","description":"The SCAH Programme sets out the Department for Environment, Food and Rural Affairs' (Defra) plans for long-term investment in the Government's main animal health science facility. The re-development of the site infrastructure and associated transformation programme will secure and safeguard the critical animal health science capability, protecting the nation from the impacts of animal diseases in a cost effective way.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. Good progress is being made towards clearing the site for construction and to inform the main investment decision point in Q3 2024 which will settle scope. This includes work on requirements and specialist technical services to support maturing the design for the scheme, which will underpin the business case. The programme remains amber due to current uncertainty of scope and funding, which will be addressed at the next Business case in 2024.","startDate":"2021-04-01","endDate":"2036-09-30","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2036-09-30. This is primarily due to the following factors. The forecast completion date for the Programme remains September '36 pending further development of the Programme Master Schedule to reflect the changes approved following the first Tranche of activity (T1a).","fyBaseline":29.72,"fyForecast":27.54,"fyVariance":-7.0,"varianceNarrative":"Forecast spend for 22/23 is c. 2.2M (7%) below the budget allocated primarily as a result of the Programme not spending c.1.5M of optimism bias that was built into the allocated budget as SRO-owned contingency for the Programme.","wholeLifeCost":2820.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 remained at 2820m. This is primarily due to the following factors. The Whole Life Cost estimate has reduced as a result of a reforecast of costs following an assessment of the changes identified through Tranche 1a of the Programme. These revised costs also reflect the updated Master Schedule.","benefits":208.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 208m. The project's departmental-agree monetised benefits at 22/23-Q4 is 208m.The project's departmental-agree monetised benefits at 22/23-Q4 is 208m.The project's departmental-agree monetised benefits at 22/23-Q4 is 208m. Work continues to identify and refine benefits for inclusion within Programme Business Case V2.0.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. Good progress is being made towards clearing the site for construction and to inform the main investment decision point in Q3 2024 which will settle scope. This…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2036-09-30. This is primarily due to the following factors. The forecast completion date for the Programme remains September '36 pending further development of the Programme Master Schedule to reflect the changes approved following the first Tranche of activity (T1a).","narrativeClaimKind":null},{"id":"DEFRA_0007_2021-Q1","year":2024,"name":"Science Capability in Animal Health Programme","department":"DEFRA","category":"Infrastructure and Construction","description":"The SCAH Programme sets out the Department for Environment, Food and Rural Affairs' (Defra) plans for long-term investment in the Government's main animal health science facility. The re-development of the site infrastructure and associated transformation programme will secure and safeguard the critical animal health science capability, protecting the nation from the impacts of animal diseases in a cost effective way.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The Programme has continued to make good progress through 23/24 to settle it's scope and progress works to clear the site in readiness for construction of new science buildings. The Programme has updated it's operating model to reflect the onboarding of Technical and Delivery Partners, and subsequent restructuring of the Intelligent Client Function. Designs have been developed in line with refined requirements, and a preferred scheme has been selected. Work is on track to submit the next Programme Business Case in 2024 to secure the scope and funding for the Programme. Delivery Confidence remains Amber pending approval.","startDate":"2021-04-01","endDate":"2036-09-30","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2036-09-30. This is primarily due to the following factors. The forecast completion date for the Programme remains September 2036. The Programme schedule will be re-validated through Programme Business Case V2.0 for which approval will be sought in FY24/25.","fyBaseline":79.62,"fyForecast":38.6,"fyVariance":-52.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. FY23/24 spend has been lower than budgeted as a result of changes to the Programme operating model and delivery plans which has resulted in some activities being deferred to future years. Delays to enabling works and not spending SRO-owned contingency has also contributed to the underspend.","wholeLifeCost":2820.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 remained at 2820m. This is primarily due to the following factors. The Whole Life Costs for the Programme remain unchanged as the Programme continues to refine its delivery strategy. The WLC will be re-validated through Programme Business Case V2.0 for which approval will be sought in FY24/25.","benefits":208.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 208m. Work continues to identify and refine benefits for inclusion within Programme Business Case V2.0.","themes":["Delivery & schedule","Cost & funding","Approvals & decisions","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The Programme has continued to make good progress through 23/24 to settle it's scope and progress works to clear the site in readiness for construction of new science…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2036-09-30. This is primarily due to the following factors. The forecast completion date for the Programme remains September 2036. The Programme schedule will be re-validated through Programme Business Case V2.0 for which approval will be sought in FY24/25.","narrativeClaimKind":null},{"id":"DEFRA_0007_2021-Q1","year":2025,"name":"National Biosecurity Centre (Weybridge)","department":"DEFRA","category":"Infrastructure and Construction","description":"The National Biosecurity Centre Programme is transforming the Animal & Plant Health Agency (APHA) Weybridge site, delivering a state-of-the-art National Biosecurity Centre facility to future proof the UK’s ability to provide essential research, surveillance and outbreak response for a range of animal pathogens, some of which are a threat to humans. It will support UK trade, our food and farming sectors, protect economic growth and the prosperity of the nation.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ With successful delivery of the Programme still feasible in light of the considerable progress made over the past 12 months. Whilst the Aug 2024 Project Assessment Review rated the programme GREEN for proceeding through Programme Business Case approval, the Delivery Confidence Assessment remains AMBER given the need for the Programme to secure funding through the second stage of the Spending Review.","startDate":"2021-04-01","endDate":"2036-09-30","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 30/09/2036. This is primarily due to the following factors‚ The Programme has continued to make good progress in relation to enabling works and preparations for construction of the new science buildings, with RIBA 3 design activities progressing to plan and procurement of a Main Works contractor on track to conclude in May 2025. The Programme’s Master Outline Planning Application has been granted consent by the Local Planning Authority and the Programme has secured approval of an updated Programme Business Case from Treasury. The Programme remains a priority for Defra.","fyBaseline":74.9,"fyForecast":50.1,"fyVariance":33.11,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The Programme continues to deliver enabling works and infrastructure projects to prepare the site for main construction, with a number of key projects underway, including site power and water infrastructure. The spend profile which was estimated in the 2021 reflects actual starts on site; some activity has moved to the right, but the Programme remains on schedule.","wholeLifeCost":null,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 2820. This is primarily due to the following factors‚ The Programme’s estimated costs have been reviewed and confirmed as part of the development of the updated Programme Business Case approved by Treasury in December 2024. Whilst unchanged, the Programme cost forecast reflects greater maturity, and less uncertainty in costs, as a result of a more mature design, operating model, delivery plan and commercial strategy.","benefits":16216.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 208 to 16216. This is primarily due to the following factors‚ Programme benefits were re-assessed as part of the development of the updated Programme Business Case, which included the development of a more detailed analytical framework for monetising the economic benefits of the Programme. The updated benefits baseline reflects the monetised benefits identified within the Programme Business Case approved by Treasury in December 2024, for which robust and appropriately validated monetised assessment methods were developed for two benefit categories: (1) reducing disease threats and (2) supporting UK trade.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ With successful delivery of the Programme still feasible in light of the considerable progress made over the past 12 months. Whilst the Aug 2024 Project Assessment…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 30/09/2036. This is primarily due to the following factors‚ The Programme has continued to make good progress in relation to enabling works and preparations for construction of the new science buildings, with RIBA 3 design activities progressing to plan and procurement of a Main Works contractor on track to conclude in May 2025. The Programme’s Master Outline Planning Application has been granted consent by the Local Planning Authority and the Programme has secured approval of an updated Programme Business Case from Treasury. The Programme remains a priority for Defra.","narrativeClaimKind":null},{"id":"DEFRA_0007_2021-Q1","year":2026,"name":"National Biosecurity Centre (Weybridge)","department":"DEFRA","category":"Infrastructure and Construction","description":"The National Biosecurity Centre Programme is transforming the Animal & Plant Health Agency (APHA) Weybridge site, delivering a state-of-the-art National Biosecurity Centre facility to future proof the UK’s ability to provide essential research, surveillance and outbreak response for a range of animal pathogens, some of which are a threat to humans. It will support UK trade, our food and farming sectors, protect economic growth and the prosperity of the nation.","ipaDca":"Green","sroDca":null,"deliveryConfidence":"Green","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 increased to GREEN. This reflects the positive progress made over the past 12 months and robustness of arrangements in place which give confidence in the deliverability of the Programme, as evidenced by the GREEN rating achieved through the NISTA Gate 0 Review in March.","startDate":"2021-04-01","endDate":"2036-09-30","scheduleNarrative":"Compared to financial year 24/25-Q4, the Programme's end-date at 25/26-Q4 remained the same at 30 Sep 2036. This is primarily due to the continued progress made towards developing designs for the future science buildings and preparing the site for the start of their construction in 2027. All critical enabling works are now in contract and works on site are ramping up. A Main Works Contractor for the new science buildings has been appointed, and RIBA 3 designs have been approved. The Programme remains a priority for Defra.","fyBaseline":128.73,"fyForecast":85.42,"fyVariance":33.64,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the timing of some enabling and infrastructure works moving to the right to prioritise critical activities, and an extension of science hub design development timescales to ensure appropriate quality prior to transferring design responsibility to the Main Works contractor. Deferred spend has been re-forecast within future FYs.","wholeLifeCost":2485.6,"costNarrative":"Compared to financial year 24/25-Q4, the Programme’s departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) remained at £2,820M. This is primarily due to continued progress in line with the scope and assumptions that underpin the Programme Business Case approved in December 2024.","benefits":10131.06,"benefitsNarrative":"Compared to financial year 24/25-Q4, the Programme’s departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at £16,216M. This is primarily due to the benefits identified within the approved Programme Business Case remaining unchanged.","themes":["Cost & funding","Delivery & schedule","Scope & requirements","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 increased to GREEN. This reflects the positive progress made over the past 12 months and robustness of arrangements in place which give confidence in the deliverability of the Programme, as evidenced by the GREEN rating achieved through the NISTA Gate…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the Programme's end-date at 25/26-Q4 remained the same at 30 Sep 2036. This is primarily due to the continued progress made towards developing designs for the future science buildings and preparing the site for the start of their construction in 2027. All critical enabling works are now in contract and works on site are ramping up. A Main Works Contractor for the new science buildings has been appointed, and RIBA 3 designs have been approved. The Programme remains a priority for Defra.","narrativeClaimKind":null}],"previous":{"id":"DEFRA_0007_2021-Q1","year":2025,"name":"National Biosecurity Centre (Weybridge)","department":"DEFRA","category":"Infrastructure and Construction","description":"The National Biosecurity Centre Programme is transforming the Animal & Plant Health Agency (APHA) Weybridge site, delivering a state-of-the-art National Biosecurity Centre facility to future proof the UK’s ability to provide essential research, surveillance and outbreak response for a range of animal pathogens, some of which are a threat to humans. It will support UK trade, our food and farming sectors, protect economic growth and the prosperity of the nation.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ With successful delivery of the Programme still feasible in light of the considerable progress made over the past 12 months. Whilst the Aug 2024 Project Assessment Review rated the programme GREEN for proceeding through Programme Business Case approval, the Delivery Confidence Assessment remains AMBER given the need for the Programme to secure funding through the second stage of the Spending Review.","startDate":"2021-04-01","endDate":"2036-09-30","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 30/09/2036. This is primarily due to the following factors‚ The Programme has continued to make good progress in relation to enabling works and preparations for construction of the new science buildings, with RIBA 3 design activities progressing to plan and procurement of a Main Works contractor on track to conclude in May 2025. The Programme’s Master Outline Planning Application has been granted consent by the Local Planning Authority and the Programme has secured approval of an updated Programme Business Case from Treasury. The Programme remains a priority for Defra.","fyBaseline":74.9,"fyForecast":50.1,"fyVariance":33.11,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The Programme continues to deliver enabling works and infrastructure projects to prepare the site for main construction, with a number of key projects underway, including site power and water infrastructure. The spend profile which was estimated in the 2021 reflects actual starts on site; some activity has moved to the right, but the Programme remains on schedule.","wholeLifeCost":null,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 2820. This is primarily due to the following factors‚ The Programme’s estimated costs have been reviewed and confirmed as part of the development of the updated Programme Business Case approved by Treasury in December 2024. Whilst unchanged, the Programme cost forecast reflects greater maturity, and less uncertainty in costs, as a result of a more mature design, operating model, delivery plan and commercial strategy.","benefits":16216.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 208 to 16216. This is primarily due to the following factors‚ Programme benefits were re-assessed as part of the development of the updated Programme Business Case, which included the development of a more detailed analytical framework for monetising the economic benefits of the Programme. The updated benefits baseline reflects the monetised benefits identified within the Programme Business Case approved by Treasury in December 2024, for which robust and appropriately validated monetised assessment methods were developed for two benefit categories: (1) reducing disease threats and (2) supporting UK trade.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ With successful delivery of the Programme still feasible in light of the considerable progress made over the past 12 months. Whilst the Aug 2024 Project Assessment…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 30/09/2036. This is primarily due to the following factors‚ The Programme has continued to make good progress in relation to enabling works and preparations for construction of the new science buildings, with RIBA 3 design activities progressing to plan and procurement of a Main Works contractor on track to conclude in May 2025. The Programme’s Master Outline Planning Application has been granted consent by the Local Planning Authority and the Programme has secured approval of an updated Programme Business Case from Treasury. The Programme remains a priority for Defra.","narrativeClaimKind":null},"ratingDelta":-1,"transition":"Improved","endDateDeltaDays":0,"attentionScore":11,"attentionReasons":["In-year forecast variance is +33.6%"]},{"id":"CO_0120_2223-Q1","year":2026,"name":"Transforming Public Procurement","department":"CO","category":"Government Transformation and Service Delivery","description":"The public procurement spend has a significant role to play in stimulating the economy. The objective of this programme is to implement legislative reforms to the UK’s public procurement regime, making it quicker, simpler and better able to meet the UK’s needs while remaining compliant with our international obligations. The programme includes implementing primary legislation, training 15,000 public sector buyers, and developing a new digital platform for commercial data.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at a RAG rating of Green. This is primarily due to all the major deliverables being achieved and expected programme closure on March 31st 2026. We are now in the final stages of closedown with only minor tasks remaining including a final programme closure report, the final programme board (on the 23rd April 2026), completion of remaining procurement notices on the CDP and handover to BAU. This is all confidently expected to be completed by the end of March.","startDate":"2021-01-01","endDate":"2026-03-31","scheduleNarrative":"Compared to financial year 24/25 Q4, the project's end-date at 25/26 Q4 remained the same. This is primarily due to all the major deliverables being achieved and expected programme closure on March 31st 2026. All tasks are confidently expected to be completed by the end of March.","fyBaseline":6.09,"fyForecast":8.04,"fyVariance":31.96,"varianceNarrative":"The 'real term' figures calculated by NISTA are not representative of the project data held on costs and see the Budget variance exceeds 5%. Following the integration of comprehensive maintenance costs through to Programme closure at the end of FY 25/26, the total Whole Life Cost has slightly decreased. The current forecast spend is £30.26m, representing a net reduction from the original projection of £31.47m.","wholeLifeCost":32.47,"costNarrative":"Following the integration of comprehensive maintenance costs through to Programme closure, the total Whole Life Cost has been slightly decreased.","benefits":271.7,"benefitsNarrative":"Delays to the commencement of the Procurement Act mean that benefits will start accruing later than initially anticipated. While the benefit estimates in the Impact Assessment published in April 2022 remain valid, the net realisation of benefits in the initial 10yr assessment period will be lower, as a result of this delay. https://bills.parliament.uk/publications/46429/documents/1767","themes":["Cost & funding","Technical & integration","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at a RAG rating of Green. This is primarily due to all the major deliverables being achieved and expected programme closure on March 31st 2026. We are now in the final stages of closedown with only minor tasks remaining including a final…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25 Q4, the project's end-date at 25/26 Q4 remained the same. This is primarily due to all the major deliverables being achieved and expected programme closure on March 31st 2026. All tasks are confidently expected to be completed by the end of March.","narrativeClaimKind":null,"history":[{"id":"CO_0120_2223-Q1","year":2023,"name":"Transforming Public Procurement","department":"CO","category":"Government Transformation and Service Delivery","description":"The Cabinet Office has started mobilisation of this programme in 2021/22 which will deliver: Introduction and delivery of a Procurement Reform Bill, delivery of the implementing secondary legislation and a new oversight unit to monitor compliance. A comprehensive training package to embed the new procurement procedures and national priorities for public procurement. New digital systems for commercial data that will bring commercial insight together across the 300bn pa public procurement spend. The Benefits from the programme are: Simpler, faster procurement procedures A more streamline process backed up by relevant training for users Greater transparency surrounding procurement procedures","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 is Amber. This is primarily due to the following factors. As a result of delays, the programme suffered setbacks in the delivery of key components of the programme along the critical path. This has necessitated the need for a programme re-baseline, which as of May 2023, has been approved and will see the new procurement regime go live in October 2024. . We are confident as a programme team that we can deliver to our policy intent, programme vision and programme benefits to a good standard within this newly allocated time frame.","startDate":"2021-01-01","endDate":"2025-03-31","scheduleNarrative":"The project's end-date at 22/23-Q4 is 2025-03-31. This is primarily due to the following factors. Due to programme wide replanning and authorisation on the re-baseline, the programme end date is now Q1 2026 (where previously it was Q4 2025). Significant work has been undertaken to ensure this milestone is achievable. Regular reporting, including directly to the minister via an overarching level 1 schedule, along with automated planning ensures that any delays can be acted upon accordingly to minimise impact/slippage.","fyBaseline":2.14,"fyForecast":1.65,"fyVariance":-23.0,"varianceNarrative":"The project's departmental-agree Whole Life Cost at 22/23-Q4 is 35m. At present the programme's baseline wlc remains the same as when we entered the GMPP in the first quarter of 2022/23. As mentioned previously, due to the re-baseline it is likely this may change our wlc figure. We are currently undertaking a review of the cost impact and will reporton this in the next reporting round.","wholeLifeCost":35.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 22/23-Q4 is 35m. This is primarily due to the following factors. The project's departmental-agree Whole Life Cost at 22/23-Q4 is 35m. At present the programme's baseline wlc remains the same as when we entered the GMPP in the first quarter of 2022/23. As mentioned previously, due to the re-baseline it is likely this may increase wlc. We are currently undertaking a review of the cost impact.","benefits":205.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 205m. Our benefits figure is 205 million over 10 years as drawn from the published Impact Assessment (see summary on page 4) https://bills.parliament.uk/publications/46429/documents/1767","themes":["Cost & funding","Delivery & schedule","Scope & requirements","Governance & assurance"],"evidenceExcerpt":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 is Amber. This is primarily due to the following factors. As a result of delays, the programme suffered setbacks in the delivery of key components of the programme along the critical path. This has necessitated the need for a programme re-baseline, which as of May 2023, has…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 22/23-Q4 is 2025-03-31. This is primarily due to the following factors. Due to programme wide replanning and authorisation on the re-baseline, the programme end date is now Q1 2026 (where previously it was Q4 2025). Significant work has been undertaken to ensure this milestone is achievable. Regular reporting, including directly to the minister via an overarching level 1 schedule, along with automated planning ensures that any delays can be acted upon accordingly to minimise impact/slippage.","narrativeClaimKind":null},{"id":"CO_0120_2223-Q1","year":2024,"name":"Transforming Public Procurement","department":"CO","category":"Government Transformation and Service Delivery","description":"The cabinet office started mobilisation of the programme in 2021/22 which will deliver:_x000D_ . Introduction and delivery of a procurement reform bill, delivery of the implementing secondary legislation and a new oversight unit to monitor compliance_x000D_ . Comprehensive training package to embed the new procurement procedures and national priorities for public procurement_x000D_ . New digital systems for commercial data that will bring commercial insight together across the 300bn Public procurement spend_x000D_ With the benefits from the programme being:_x000D_ . Simpler, faster procurement procedure_x000D_ . Streamlined process back up by relevant training for user_x000D_ . Greater transparency surrounding procurement procedures","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. 2023-24 witnessed significant milestones in the programme with the Royal Assent of the Procurement Act, launch of first training and guidance products, releases of digital notices to key stakeholders, and engagement and communications activities to support the launch of the new regime. The programme remains on track to deliver the new regime in October 2024. The laying of the secondary legislation on the 25th March ensured that the six month implementation period has been maintained. The Programme underwent an assurance review in November, resulting in an Amber appraisal and confidence from the reviewers that delivery to the original stated outcomes would be achieved.","startDate":"2021-01-01","endDate":"2025-03-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2025-03-31. This is primarily due to the following factors. Royal Assent of the Procurement Act was later than anticipated, pushing back the launch of the new regime to October 2024 and project end date to 31.03.2026","fyBaseline":7.1,"fyForecast":6.5,"fyVariance":-8.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. Royal Assent of the Procurement Act was later than anticipated, pushing back recruitment to some L&D roles and leading to a reduction to the forecast L&D delivery costs for 23/24 (moving them to 24/25), leading to an underspend in 2023/24. This has not affected the launch of L&D products and the new public procurement regime is on track to launch in October 2024","wholeLifeCost":35.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 remained at 35m. This is primarily due to the following factors. The project's baseline WLC remains at 35m. The project business case is being refreshed as we prepare for entering the next phase of the project lifecycle with go live of the new procurement regime in October 2024 and the subsequent development phases to follow.","benefits":205.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 205m. The project's best estimate net benefits remains at 205m over 10 years. We expect the non-quantifiable benefits to be significantly greater than this. This is as set out in the Impact Assessment published in April 2022 https://bills.parliament.uk/publications/46429/documents/1767","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. 2023-24 witnessed significant milestones in the programme with the Royal Assent of the Procurement Act, launch of first training and guidance products, releases of digital…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2025-03-31. This is primarily due to the following factors. Royal Assent of the Procurement Act was later than anticipated, pushing back the launch of the new regime to October 2024 and project end date to 31.03.2026","narrativeClaimKind":null},{"id":"CO_0120_2223-Q1","year":2025,"name":"Transforming Public Procurement","department":"CO","category":"Government Transformation and Service Delivery","description":"The Transforming Public Procurement Programme aims to improve the way public procurement is regulated in order to: • Create a simpler and more flexible, commercial system that better meets our country’s needs while remaining compliant with our international obligations • Open up public procurement to new entrants such as small businesses and social enterprises so that they can compete for and win more public contracts • Embed transparency throughout the commercial lifecycle so that the spending of taxpayers’ money can be properly scrutinised.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors‚ The programme achieved a successful go-live on the 24th February 2025 as planned, with the commencement of the Procurement Act and successful launch of the central digital platform. In the first month of operation, over 2000 procurement notices were published and 13,000 suppliers registered. Overall take up of the learning and development products remains high, with nearly 19,000 learners having completed the e-learning and over 14,500 enrolled on the advanced ‘deep dive’ training. The National Procurement Policy Statement laid in Parliament prior to go-live constituted the final major workstream of the Policy and Legislation project and this has now subsequently entered closedown, along with the Learning and Development project. With the major components now delivered, the programme is focused on further development of the central digital platform. Evaluation planning is underway, with an interim evaluation planned to assess the first year of delivery, ahead of full evaluation after 5 years. We anticipate the programme to enter closure as planned at the end of 2025/26.","startDate":"2021-01-01","endDate":"2026-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2025 to 31/03/2026. This is primarily due to the following factors‚ The project end date was moved to 31/03/2026 in financial year 23/24, as a result of the later than anticipated royal assent of the Procurement Act in October 2023. There has been no further change to project end date during 24/25.","fyBaseline":10.35,"fyForecast":8.98,"fyVariance":13.24,"varianceNarrative":"The budget variance is -13%. This is primarily due to the following factors‚ There has been some underspend on the central digital platform project in 2024/25, largely relating to slight delays and therefore reduced costs relating to hosting, data reporting and analytics development work (moving the development work into 2025/26). This did not affect the successful launch of the platform and wider programme in February 2025.","wholeLifeCost":31.5,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 31.5. This is primarily due to the following factors‚ The project's baseline has stabilised at £31.5m and expected whole life costs are in line with this.","benefits":205.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 205. This is primarily due to the following factors‚ Benefits realisation will start later than previously planned due to delays in the commencement act, causing the figure to remain stable.","themes":["Cost & funding","Commercial & supply chain","Technical & integration","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors‚ The programme achieved a successful go-live on the 24th February 2025 as planned, with the commencement of the Procurement Act and successful launch of…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2025 to 31/03/2026. This is primarily due to the following factors‚ The project end date was moved to 31/03/2026 in financial year 23/24, as a result of the later than anticipated royal assent of the Procurement Act in October 2023. There has been no further change to project end date during 24/25.","narrativeClaimKind":null},{"id":"CO_0120_2223-Q1","year":2026,"name":"Transforming Public Procurement","department":"CO","category":"Government Transformation and Service Delivery","description":"The public procurement spend has a significant role to play in stimulating the economy. The objective of this programme is to implement legislative reforms to the UK’s public procurement regime, making it quicker, simpler and better able to meet the UK’s needs while remaining compliant with our international obligations. The programme includes implementing primary legislation, training 15,000 public sector buyers, and developing a new digital platform for commercial data.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at a RAG rating of Green. This is primarily due to all the major deliverables being achieved and expected programme closure on March 31st 2026. We are now in the final stages of closedown with only minor tasks remaining including a final programme closure report, the final programme board (on the 23rd April 2026), completion of remaining procurement notices on the CDP and handover to BAU. This is all confidently expected to be completed by the end of March.","startDate":"2021-01-01","endDate":"2026-03-31","scheduleNarrative":"Compared to financial year 24/25 Q4, the project's end-date at 25/26 Q4 remained the same. This is primarily due to all the major deliverables being achieved and expected programme closure on March 31st 2026. All tasks are confidently expected to be completed by the end of March.","fyBaseline":6.09,"fyForecast":8.04,"fyVariance":31.96,"varianceNarrative":"The 'real term' figures calculated by NISTA are not representative of the project data held on costs and see the Budget variance exceeds 5%. Following the integration of comprehensive maintenance costs through to Programme closure at the end of FY 25/26, the total Whole Life Cost has slightly decreased. The current forecast spend is £30.26m, representing a net reduction from the original projection of £31.47m.","wholeLifeCost":32.47,"costNarrative":"Following the integration of comprehensive maintenance costs through to Programme closure, the total Whole Life Cost has been slightly decreased.","benefits":271.7,"benefitsNarrative":"Delays to the commencement of the Procurement Act mean that benefits will start accruing later than initially anticipated. While the benefit estimates in the Impact Assessment published in April 2022 remain valid, the net realisation of benefits in the initial 10yr assessment period will be lower, as a result of this delay. https://bills.parliament.uk/publications/46429/documents/1767","themes":["Cost & funding","Technical & integration","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at a RAG rating of Green. This is primarily due to all the major deliverables being achieved and expected programme closure on March 31st 2026. We are now in the final stages of closedown with only minor tasks remaining including a final…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25 Q4, the project's end-date at 25/26 Q4 remained the same. This is primarily due to all the major deliverables being achieved and expected programme closure on March 31st 2026. All tasks are confidently expected to be completed by the end of March.","narrativeClaimKind":null}],"previous":{"id":"CO_0120_2223-Q1","year":2025,"name":"Transforming Public Procurement","department":"CO","category":"Government Transformation and Service Delivery","description":"The Transforming Public Procurement Programme aims to improve the way public procurement is regulated in order to: • Create a simpler and more flexible, commercial system that better meets our country’s needs while remaining compliant with our international obligations • Open up public procurement to new entrants such as small businesses and social enterprises so that they can compete for and win more public contracts • Embed transparency throughout the commercial lifecycle so that the spending of taxpayers’ money can be properly scrutinised.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors‚ The programme achieved a successful go-live on the 24th February 2025 as planned, with the commencement of the Procurement Act and successful launch of the central digital platform. In the first month of operation, over 2000 procurement notices were published and 13,000 suppliers registered. Overall take up of the learning and development products remains high, with nearly 19,000 learners having completed the e-learning and over 14,500 enrolled on the advanced ‘deep dive’ training. The National Procurement Policy Statement laid in Parliament prior to go-live constituted the final major workstream of the Policy and Legislation project and this has now subsequently entered closedown, along with the Learning and Development project. With the major components now delivered, the programme is focused on further development of the central digital platform. Evaluation planning is underway, with an interim evaluation planned to assess the first year of delivery, ahead of full evaluation after 5 years. We anticipate the programme to enter closure as planned at the end of 2025/26.","startDate":"2021-01-01","endDate":"2026-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2025 to 31/03/2026. This is primarily due to the following factors‚ The project end date was moved to 31/03/2026 in financial year 23/24, as a result of the later than anticipated royal assent of the Procurement Act in October 2023. There has been no further change to project end date during 24/25.","fyBaseline":10.35,"fyForecast":8.98,"fyVariance":13.24,"varianceNarrative":"The budget variance is -13%. This is primarily due to the following factors‚ There has been some underspend on the central digital platform project in 2024/25, largely relating to slight delays and therefore reduced costs relating to hosting, data reporting and analytics development work (moving the development work into 2025/26). This did not affect the successful launch of the platform and wider programme in February 2025.","wholeLifeCost":31.5,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 31.5. This is primarily due to the following factors‚ The project's baseline has stabilised at £31.5m and expected whole life costs are in line with this.","benefits":205.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 205. This is primarily due to the following factors‚ Benefits realisation will start later than previously planned due to delays in the commencement act, causing the figure to remain stable.","themes":["Cost & funding","Commercial & supply chain","Technical & integration","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors‚ The programme achieved a successful go-live on the 24th February 2025 as planned, with the commencement of the Procurement Act and successful launch of…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2025 to 31/03/2026. This is primarily due to the following factors‚ The project end date was moved to 31/03/2026 in financial year 23/24, as a result of the later than anticipated royal assent of the Procurement Act in October 2023. There has been no further change to project end date during 24/25.","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":0,"attentionScore":11,"attentionReasons":["In-year forecast variance is +32.0%"]},{"id":"MOD_0134_2122-Q1","year":2026,"name":"TEUTATES","department":"MOD","category":"Military Capability","description":"As part of the 2010 Lancaster House Agreements, a Treaty was established on a joint radiographic/hydrodynamics capability with France known as TEUTATES. The trials will be in a jointly operated facility but conducted on a national basis and are needed to underwrite the safety and performance of our nuclear weapon stockpile. TEUTATES covers the joint construction, funding, and operation of a new hydrodynamics facility in France, at Epure, near Dijon, and a technology development centre and interim firing point in the UK at the Atomic Weapons Establishment, at Aldermaston. The TEUTATES facilities will enable each country to undertake hydrodynamic experiments in a secure environment. The hydrodynamic facilities use radiography to measure the performance of materials at extremes of temperature and pressure. This enables us to model the performance and safety of the nuclear weapons in our current stockpile without undertaking nuclear explosive tests, and will make an important contribution to assuring the performance, safety and reliability of our next generation of nuclear weapons.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 27 - International relations","startDate":"2013-04-01","endDate":"2030-07-01","scheduleNarrative":"Exempt under Section 27 - International relations","fyBaseline":27.0,"fyForecast":27.0,"fyVariance":27.0,"varianceNarrative":"Exempt under Section 27 – International relations","wholeLifeCost":null,"costNarrative":"Exempt under Section 27 - International relations","benefits":null,"benefitsNarrative":"Exempt under Section 27 - International relations","themes":[],"evidenceExcerpt":"Exempt under Section 27 - International relations Exempt under Section 27 - International relations","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 27 - International relations","narrativeClaimKind":null,"history":[{"id":"MOD_0134_2122-Q1","year":2022,"name":"TEUTATES","department":"MOD","category":"Military Capability","description":"Exempt under Section 24 of the Freedom of Information Act 2000 (National security)","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 24 of the Freedom of Information Act 2000 (National security)","startDate":null,"endDate":null,"scheduleNarrative":"Exempt under Section 24 of the Freedom of Information Act 2000 (National security)","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 24 of the Freedom of Information Act 2000 (National security)","wholeLifeCost":null,"costNarrative":"Exempt under Section 24 of the Freedom of Information Act 2000 (National security)","benefits":null,"benefitsNarrative":"","themes":[],"evidenceExcerpt":"Exempt under Section 24 of the Freedom of Information Act 2000 (National security) Exempt under Section 24 of the Freedom of Information Act 2000 (National security)","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 24 of the Freedom of Information Act 2000 (National security)","narrativeClaimKind":null},{"id":"MOD_0134_2122-Q1","year":2023,"name":"TEUTATES","department":"MOD","category":"Military Capability","description":"As part of the 2010 Lancaster House Agreements; a Treaty was established on a joint radiographic/hydrodynamics capability with France known as Teutates. The trials will be in a jointly operated facility but conducted on a national basis and are needed to underwrite the safety and performance of our nuclear weapon stockpile. Teutates covers the joint construction; funding; and operation of a new hydrodynamics facility in France; at Epure; near Dijon; and a technology development centre and interim firing point in the UK at the Atomic Weapons Establishment; at Aldermaston. The Teutates facilities will enable each country to undertake hydrodynamic experiments in a secure environment. The hydrodynamic facilities use radiography to measure the performance of materials at extremes of temperature and pressure. This enables us to model the performance and safety of the nuclear weapons in our current stockpile without undertaking nuclear explosive tests; and will make an important contribution to assuring the performance; safety and reliability of our next generation of nuclear weapons.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 27 of the Freedom of Information Act 2000 (International Relations)","startDate":"2013-04-01","endDate":"2064-03-31","scheduleNarrative":"The project's end-date at 22/23-Q4 is 2064-03-31. This is primarily due to the following factors. Exempt under Section 27 of the Freedom of Information Act 2000 (International Relations)","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 27 of the Freedom of Information Act 2000 (International Relations)","wholeLifeCost":null,"costNarrative":"Exempt under Section 27 of the Freedom of Information Act 2000 (International Relations)","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. This programme does not report cashable benefits. Its aim is to provision the armed forces with the equipment and / or infrastructure required.","themes":[],"evidenceExcerpt":"Exempt under Section 27 of the Freedom of Information Act 2000 (International Relations) The project's end-date at 22/23-Q4 is 2064-03-31. This is primarily due to the following factors. Exempt under Section 27 of the Freedom of Information Act 2000 (International Relations)","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 22/23-Q4 is 2064-03-31. This is primarily due to the following factors. Exempt under Section 27 of the Freedom of Information Act 2000 (International Relations)","narrativeClaimKind":null},{"id":"MOD_0134_2122-Q1","year":2024,"name":"TEUTATES","department":"MOD","category":"Military Capability","description":"As part of the 2010 Lancaster House Agreements; a Treaty was established on a joint radiographic/hydrodynamics capability with France known as Teutates. The programme covers the joint construction; funding; and operation of a new hydrodynamics facility in France; at Epure; near Dijon; and a technology development centre and interim firing point in the UK at the Atomic Weapons Establishment; at Aldermaston. These facilities will enable each country to undertake hydrodynamic experiments in a secure environment. The trials will be in a jointly operated facility but conducted on a national basis and are needed to underwrite the safety and performance of our nuclear weapon stockpile.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Sections 24, 26 and 27 of the Freedom of Information Act 2000","startDate":"2013-04-01","endDate":null,"scheduleNarrative":"Exempt under Sections 24, 26 and 27 of the Freedom of Information Act 2000","fyBaseline":2426272000.0,"fyForecast":2426272000.0,"fyVariance":2426272000.0,"varianceNarrative":"Exempt under Sections 24, 26 and 27 of the Freedom of Information Act 2000","wholeLifeCost":2426272000.0,"costNarrative":"Exempt under Sections 24, 26 and 27 of the Freedom of Information Act 2000","benefits":0.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 0m.","themes":[],"evidenceExcerpt":"Exempt under Sections 24, 26 and 27 of the Freedom of Information Act 2000 Exempt under Sections 24, 26 and 27 of the Freedom of Information Act 2000","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Sections 24, 26 and 27 of the Freedom of Information Act 2000","narrativeClaimKind":null},{"id":"MOD_0134_2122-Q1","year":2025,"name":"TEUTATES","department":"MoD","category":"Military Capability","description":"As part of the 2010 Lancaster House Agreements, a Treaty was established on a joint radiographic/hydrodynamics capability with France known as Teutates. The trials will be in a jointly operated facility but conducted on a national basis and are needed to underwrite the safety and performance of our nuclear weapon stockpile. Teutates covers the joint construction, funding and operation of a new hydrodynamics facility in France at Epure near Dijon and a technology development centre and interim firing point in the UK. The Teutates facilities will enable each country to undertake hydrodynamic experiments in a secure environment assuring the performance, safety and reliability of our next generation of nuclear weapons.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Section 27 - International relations","startDate":"2013-04-01","endDate":"2064-03-31","scheduleNarrative":"Section 27 - International relations","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 27 - International relations","wholeLifeCost":null,"costNarrative":"Section 27 - International relations","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits","themes":[],"evidenceExcerpt":"Section 27 - International relations Section 27 - International relations","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Section 27 - International relations","narrativeClaimKind":null},{"id":"MOD_0134_2122-Q1","year":2026,"name":"TEUTATES","department":"MOD","category":"Military Capability","description":"As part of the 2010 Lancaster House Agreements, a Treaty was established on a joint radiographic/hydrodynamics capability with France known as TEUTATES. The trials will be in a jointly operated facility but conducted on a national basis and are needed to underwrite the safety and performance of our nuclear weapon stockpile. TEUTATES covers the joint construction, funding, and operation of a new hydrodynamics facility in France, at Epure, near Dijon, and a technology development centre and interim firing point in the UK at the Atomic Weapons Establishment, at Aldermaston. The TEUTATES facilities will enable each country to undertake hydrodynamic experiments in a secure environment. The hydrodynamic facilities use radiography to measure the performance of materials at extremes of temperature and pressure. This enables us to model the performance and safety of the nuclear weapons in our current stockpile without undertaking nuclear explosive tests, and will make an important contribution to assuring the performance, safety and reliability of our next generation of nuclear weapons.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 27 - International relations","startDate":"2013-04-01","endDate":"2030-07-01","scheduleNarrative":"Exempt under Section 27 - International relations","fyBaseline":27.0,"fyForecast":27.0,"fyVariance":27.0,"varianceNarrative":"Exempt under Section 27 – International relations","wholeLifeCost":null,"costNarrative":"Exempt under Section 27 - International relations","benefits":null,"benefitsNarrative":"Exempt under Section 27 - International relations","themes":[],"evidenceExcerpt":"Exempt under Section 27 - International relations Exempt under Section 27 - International relations","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 27 - International relations","narrativeClaimKind":null}],"previous":{"id":"MOD_0134_2122-Q1","year":2025,"name":"TEUTATES","department":"MoD","category":"Military Capability","description":"As part of the 2010 Lancaster House Agreements, a Treaty was established on a joint radiographic/hydrodynamics capability with France known as Teutates. The trials will be in a jointly operated facility but conducted on a national basis and are needed to underwrite the safety and performance of our nuclear weapon stockpile. Teutates covers the joint construction, funding and operation of a new hydrodynamics facility in France at Epure near Dijon and a technology development centre and interim firing point in the UK. The Teutates facilities will enable each country to undertake hydrodynamic experiments in a secure environment assuring the performance, safety and reliability of our next generation of nuclear weapons.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Section 27 - International relations","startDate":"2013-04-01","endDate":"2064-03-31","scheduleNarrative":"Section 27 - International relations","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 27 - International relations","wholeLifeCost":null,"costNarrative":"Section 27 - International relations","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits","themes":[],"evidenceExcerpt":"Section 27 - International relations Section 27 - International relations","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Section 27 - International relations","narrativeClaimKind":null},"ratingDelta":null,"transition":"Not comparable","endDateDeltaDays":-12327,"attentionScore":9,"attentionReasons":["In-year forecast variance is +27.0%"]},{"id":"MOD_0111_1718-Q1","year":2026,"name":"JOINT CRYPT KEY PROGRAMME","department":"MOD","category":"Information and Communications Technology (ICT)","description":"Exempt under Section 23 - Information supplied by, or relating to, bodies dealing with security matters","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 23 - Information supplied by, or relating to, bodies dealing with security matters","startDate":null,"endDate":null,"scheduleNarrative":"Exempt under Section 23 - Information supplied by, or relating to, bodies dealing with security matters","fyBaseline":23.0,"fyForecast":23.0,"fyVariance":23.0,"varianceNarrative":"Exempt under Section 23 – Information supplied by, or relating to, bodies dealing with security matters​","wholeLifeCost":null,"costNarrative":"Exempt under Section 23 - Information supplied by, or relating to, bodies dealing with security matters","benefits":null,"benefitsNarrative":"Exempt under Section 23 - Information supplied by, or relating to, bodies dealing with security matters","themes":[],"evidenceExcerpt":"Exempt under Section 23 - Information supplied by, or relating to, bodies dealing with security matters Exempt under Section 23 - Information supplied by, or relating to, bodies dealing with security matters","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 23 - Information supplied by, or relating to, bodies dealing with security matters","narrativeClaimKind":null,"history":[{"id":"MOD_0111_1718-Q1","year":2020,"name":"Joint Crypt Key Programme","department":"MOD","category":"ICT","description":"To support the department's Information Assurance Capability.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 26 of Freedom of Information Act 2000 (Defence)","startDate":null,"endDate":null,"scheduleNarrative":"Exempt under Section 26 of Freedom of Information Act 2000 (Defence)","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 26 of Freedom of Information Act 2000 (Defence)","wholeLifeCost":null,"costNarrative":"Exempt under Section 26 of Freedom of Information Act 2000 (Defence)","benefits":null,"benefitsNarrative":"","themes":[],"evidenceExcerpt":"Exempt under Section 26 of Freedom of Information Act 2000 (Defence) Exempt under Section 26 of Freedom of Information Act 2000 (Defence)","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2020","sourceLabel":"IPA Annual Report 2019-20","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 26 of Freedom of Information Act 2000 (Defence)","narrativeClaimKind":null},{"id":"MOD_0111_1718-Q1","year":2021,"name":"Joint Crypt Key Programme","department":"MOD","category":"Military Capability","description":"Exempt under Section 26 of the Freedom of Information Act 2000 (Defence)","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 26 of the Freedom of Information Act 2000 (Defence)","startDate":null,"endDate":null,"scheduleNarrative":"Exempt under Section 26 of the Freedom of Information Act 2000 (Defence)","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 26 of the Freedom of Information Act 2000 (Defence)","wholeLifeCost":null,"costNarrative":"Exempt under Section 26 of the Freedom of Information Act 2000 (Defence)","benefits":null,"benefitsNarrative":"","themes":[],"evidenceExcerpt":"Exempt under Section 26 of the Freedom of Information Act 2000 (Defence) Exempt under Section 26 of the Freedom of Information Act 2000 (Defence)","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 26 of the Freedom of Information Act 2000 (Defence)","narrativeClaimKind":null},{"id":"MOD_0111_1718-Q1","year":2022,"name":"Joint Crypt Key Programme","department":"MOD","category":"Military Capability","description":"Exempt under Section 26 of Freedom of Information Act 2000 (Defence).","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 26 of Freedom of Information Act 2000 (Defence).","startDate":null,"endDate":null,"scheduleNarrative":"Exempt under Section 26 of Freedom of Information Act 2000 (Defence).","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 26 of Freedom of Information Act 2000 (Defence).","wholeLifeCost":null,"costNarrative":"Exempt under Section 26 of Freedom of Information Act 2000 (Defence).","benefits":null,"benefitsNarrative":"","themes":[],"evidenceExcerpt":"Exempt under Section 26 of Freedom of Information Act 2000 (Defence). Exempt under Section 26 of Freedom of Information Act 2000 (Defence).","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 26 of Freedom of Information Act 2000 (Defence).","narrativeClaimKind":null},{"id":"MOD_0111_1718-Q1","year":2023,"name":"Joint Crypt Key Programme","department":"MOD","category":"Military Capability","description":"Exempt under Section 26 of Freedom of Information Act 2000 (Defence).","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 26 of Freedom of Information Act 2000 (Defence).","startDate":null,"endDate":null,"scheduleNarrative":"Exempt under Section 26 of Freedom of Information Act 2000 (Defence).","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 26 of Freedom of Information Act 2000 (Defence).","wholeLifeCost":null,"costNarrative":"Exempt under Section 26 of Freedom of Information Act 2000 (Defence).","benefits":null,"benefitsNarrative":"The project did not provide departmental-agree monetised benefits at 22/23-Q4. The project did not provide departmental-agree monetised benefits at 22/23-Q4.","themes":[],"evidenceExcerpt":"Exempt under Section 26 of Freedom of Information Act 2000 (Defence). Exempt under Section 26 of Freedom of Information Act 2000 (Defence).","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 26 of Freedom of Information Act 2000 (Defence).","narrativeClaimKind":null},{"id":"MOD_0111_1718-Q1","year":2024,"name":"Joint Crypt Key Programme","department":"MOD","category":"Military Capability","description":"Exempt under Section 26 of Freedom of Information Act 2000 (Exempt under Section 26 of the Freedom of Information Act 2000 (Defence)).","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 26 of Freedom of Information Act 2000 (Exempt under Section 26 of the Freedom of Information Act 2000 (Defence)).","startDate":null,"endDate":null,"scheduleNarrative":"Exempt under Section 26 of Freedom of Information Act 2000 (Exempt under Section 26 of the Freedom of Information Act 2000 (Defence)).","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 26 of Freedom of Information Act 2000 (Exempt under Section 26 of the Freedom of Information Act 2000 (Defence)).","wholeLifeCost":null,"costNarrative":"Exempt under Section 26 of Freedom of Information Act 2000 (Exempt under Section 26 of the Freedom of Information Act 2000 (Defence)).","benefits":0.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 0m.","themes":[],"evidenceExcerpt":"Exempt under Section 26 of Freedom of Information Act 2000 (Exempt under Section 26 of the Freedom of Information Act 2000 (Defence)). Exempt under Section 26 of Freedom of Information Act 2000 (Exempt under Section 26 of the Freedom of Information Act 2000 (Defence)).","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 26 of Freedom of Information Act 2000 (Exempt under Section 26 of the Freedom of Information Act 2000 (Defence)).","narrativeClaimKind":null},{"id":"MOD_0111_1718-Q1","year":2025,"name":"JOINT CRYPT KEY PROGRAMME","department":"MoD","category":"Military Capability","description":"Section 23 - Information supplied by, or relating to, bodies dealing with security matters","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Section 23 - Information supplied by, or relating to, bodies dealing with security matters","startDate":null,"endDate":null,"scheduleNarrative":"Section 23 - Information supplied by, or relating to, bodies dealing with security matters","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 23 - Information supplied by, or relating to, bodies dealing with security matters","wholeLifeCost":null,"costNarrative":"Section 23 - Information supplied by, or relating to, bodies dealing with security matters","benefits":null,"benefitsNarrative":"Section 23 - Information supplied by, or relating to, bodies dealing with security matters","themes":[],"evidenceExcerpt":"Section 23 - Information supplied by, or relating to, bodies dealing with security matters Section 23 - Information supplied by, or relating to, bodies dealing with security matters","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Section 23 - Information supplied by, or relating to, bodies dealing with security matters","narrativeClaimKind":null},{"id":"MOD_0111_1718-Q1","year":2026,"name":"JOINT CRYPT KEY PROGRAMME","department":"MOD","category":"Information and Communications Technology (ICT)","description":"Exempt under Section 23 - Information supplied by, or relating to, bodies dealing with security matters","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 23 - Information supplied by, or relating to, bodies dealing with security matters","startDate":null,"endDate":null,"scheduleNarrative":"Exempt under Section 23 - Information supplied by, or relating to, bodies dealing with security matters","fyBaseline":23.0,"fyForecast":23.0,"fyVariance":23.0,"varianceNarrative":"Exempt under Section 23 – Information supplied by, or relating to, bodies dealing with security matters​","wholeLifeCost":null,"costNarrative":"Exempt under Section 23 - Information supplied by, or relating to, bodies dealing with security matters","benefits":null,"benefitsNarrative":"Exempt under Section 23 - Information supplied by, or relating to, bodies dealing with security matters","themes":[],"evidenceExcerpt":"Exempt under Section 23 - Information supplied by, or relating to, bodies dealing with security matters Exempt under Section 23 - Information supplied by, or relating to, bodies dealing with security matters","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 23 - Information supplied by, or relating to, bodies dealing with security matters","narrativeClaimKind":null}],"previous":{"id":"MOD_0111_1718-Q1","year":2025,"name":"JOINT CRYPT KEY PROGRAMME","department":"MoD","category":"Military Capability","description":"Section 23 - Information supplied by, or relating to, bodies dealing with security matters","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Section 23 - Information supplied by, or relating to, bodies dealing with security matters","startDate":null,"endDate":null,"scheduleNarrative":"Section 23 - Information supplied by, or relating to, bodies dealing with security matters","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 23 - Information supplied by, or relating to, bodies dealing with security matters","wholeLifeCost":null,"costNarrative":"Section 23 - Information supplied by, or relating to, bodies dealing with security matters","benefits":null,"benefitsNarrative":"Section 23 - Information supplied by, or relating to, bodies dealing with security matters","themes":[],"evidenceExcerpt":"Section 23 - Information supplied by, or relating to, bodies dealing with security matters Section 23 - Information supplied by, or relating to, bodies dealing with security matters","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Section 23 - Information supplied by, or relating to, bodies dealing with security matters","narrativeClaimKind":null},"ratingDelta":null,"transition":"Not comparable","endDateDeltaDays":null,"attentionScore":8,"attentionReasons":["In-year forecast variance is +23.0%"]},{"id":"HO_0047_2122-Q1","year":2026,"name":"RADIOLOGICAL AND NUCLEAR CHANGE PROGRAMME (RNCP)","department":"HO","category":"Government Transformation and Service Delivery","description":"Exempt under Section 24 - National security","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 24 - National security","startDate":null,"endDate":null,"scheduleNarrative":"Exempt under Section 24 - National security","fyBaseline":24.0,"fyForecast":24.0,"fyVariance":24.0,"varianceNarrative":"Exempt under Section 24 – National Security​","wholeLifeCost":null,"costNarrative":"Exempt under Section 24 - National security","benefits":null,"benefitsNarrative":"Exempt under Section 24 - National security","themes":[],"evidenceExcerpt":"Exempt under Section 24 - National security Exempt under Section 24 - National security","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 24 - National security","narrativeClaimKind":null,"history":[{"id":"HO_0047_2122-Q1","year":2022,"name":"Nuclear Security Portfolio","department":"HO","category":"Government Transformation and Service Delivery","description":"Nuclear Security Portfolio has been established to maintain and improve the UK's defences from radiological and nuclear terrorism, and its preparedness for such a risk.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 24 of the Freedom of Information Act 2000 (National security)","startDate":"2021-03-26","endDate":"2025-03-31","scheduleNarrative":"Exempt under Section 24 of the Freedom of Information Act 2000 (National security)","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Early planning GMPP project (The project has not yet passed SOC, or its programme equivalent)","wholeLifeCost":528.0,"costNarrative":"Exempt under Section 22 of the Freedom of Information Act 2000 (Information intended for future publication)","benefits":null,"benefitsNarrative":"","themes":[],"evidenceExcerpt":"Exempt under Section 24 of the Freedom of Information Act 2000 (National security) Exempt under Section 24 of the Freedom of Information Act 2000 (National security)","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 24 of the Freedom of Information Act 2000 (National security)","narrativeClaimKind":null},{"id":"HO_0047_2122-Q1","year":2023,"name":"Nuclear Security Portfolio","department":"HO","category":"Government Transformation and Service Delivery","description":"Nuclear Security Portfolio has been established to maintain and improve the UKs defences from radiological and nuclear terrorism, and its preparedness for such a risk.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 24 of the Freedom of Information Act 2000 (National security)","startDate":"2021-03-26","endDate":"2023-09-30","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 decreased from 2025-03-31 to 2023-09-30. This is primarily due to the following factors. Exempt under Section 24 of the Freedom of Information Act 2000 (National security)","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 24 of the Freedom of Information Act 2000 (National security)","wholeLifeCost":null,"costNarrative":"Exempt under Section 24 of the Freedom of Information Act 2000 (National security)","benefits":null,"benefitsNarrative":"Exempt under Section 24 of the Freedom of Information Act 2000 (National security)","themes":["Cost & funding"],"evidenceExcerpt":"Exempt under Section 24 of the Freedom of Information Act 2000 (National security) Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 decreased from 2025-03-31 to 2023-09-30. This is primarily due to the following factors. Exempt under Section 24 of the Freedom of Information Act 2000 (National security)","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 decreased from 2025-03-31 to 2023-09-30. This is primarily due to the following factors. Exempt under Section 24 of the Freedom of Information Act 2000 (National security)","narrativeClaimKind":null},{"id":"HO_0047_2122-Q1","year":2024,"name":"Radiological and Nuclear Change Programme (RNCP)","department":"HO","category":"Government Transformation and Service Delivery","description":"Nuclear Change Portfolio has been established to maintain and improve the UK's defences from radiological and nuclear terrorism and it's preparedness for such a risk.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 24 of the Freedom of Information Act 2000 (National security)","startDate":"2021-03-26","endDate":null,"scheduleNarrative":"Exempt under Section 24 of the Freedom of Information Act 2000 (National security)","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 24 of the Freedom of Information Act 2000 (National security)","wholeLifeCost":null,"costNarrative":"Exempt under Section 24 of the Freedom of Information Act 2000 (National security)","benefits":null,"benefitsNarrative":"Exempt under Section 24 of the Freedom of Information Act 2000 (National security)","themes":[],"evidenceExcerpt":"Exempt under Section 24 of the Freedom of Information Act 2000 (National security) Exempt under Section 24 of the Freedom of Information Act 2000 (National security)","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 24 of the Freedom of Information Act 2000 (National security)","narrativeClaimKind":null},{"id":"HO_0047_2122-Q1","year":2025,"name":"RADIOLOGICAL AND NUCLEAR CHANGE PROGRAMME (RNCP)","department":"HO","category":"Government Transformation and Service Delivery","description":"Section 24 - National security","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Section 24 - National security","startDate":null,"endDate":null,"scheduleNarrative":"Section 24 - National security","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 24 - National security","wholeLifeCost":null,"costNarrative":"Section 24 - National security","benefits":null,"benefitsNarrative":"Section 24 - National security","themes":[],"evidenceExcerpt":"Section 24 - National security Section 24 - National security","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Section 24 - National security","narrativeClaimKind":null},{"id":"HO_0047_2122-Q1","year":2026,"name":"RADIOLOGICAL AND NUCLEAR CHANGE PROGRAMME (RNCP)","department":"HO","category":"Government Transformation and Service Delivery","description":"Exempt under Section 24 - National security","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 24 - National security","startDate":null,"endDate":null,"scheduleNarrative":"Exempt under Section 24 - National security","fyBaseline":24.0,"fyForecast":24.0,"fyVariance":24.0,"varianceNarrative":"Exempt under Section 24 – National Security​","wholeLifeCost":null,"costNarrative":"Exempt under Section 24 - National security","benefits":null,"benefitsNarrative":"Exempt under Section 24 - National security","themes":[],"evidenceExcerpt":"Exempt under Section 24 - National security Exempt under Section 24 - National security","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 24 - National security","narrativeClaimKind":null}],"previous":{"id":"HO_0047_2122-Q1","year":2025,"name":"RADIOLOGICAL AND NUCLEAR CHANGE PROGRAMME (RNCP)","department":"HO","category":"Government Transformation and Service Delivery","description":"Section 24 - National security","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Section 24 - National security","startDate":null,"endDate":null,"scheduleNarrative":"Section 24 - National security","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 24 - National security","wholeLifeCost":null,"costNarrative":"Section 24 - National security","benefits":null,"benefitsNarrative":"Section 24 - National security","themes":[],"evidenceExcerpt":"Section 24 - National security Section 24 - National security","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Section 24 - National security","narrativeClaimKind":null},"ratingDelta":null,"transition":"Not comparable","endDateDeltaDays":null,"attentionScore":8,"attentionReasons":["In-year forecast variance is +24.0%"]},{"id":"DFT_0046_2021-Q2","year":2026,"name":"EAST WEST RAIL CONNECTION STATE 1","department":"DFT","category":"Infrastructure and Construction","description":"East West Rail (EWR) is a new railway connecting towns and cities across the Oxford-Cambridge growth corridor. The Government has identified the corridor as a key pillar of its economic growth mission – by delivering new east-west connectivity and removing existing constraints to growth, EWR is projected to support up to 100,000 new homes, tens of thousands of new jobs and it is expected to add £6.7bn to regional GVA each year by 2050. The EWR programme is structured around the phased introduction of passenger services from the mid 2020s to the mid-late 2030s. The railway will deliver shorter journey times between key economic centres; provide greener public transport and new paths for rail freight; and provide interchanges with major rail lines, supporting onward travel across the country. It will provide a total of 8 new stations, including at Cambridge East and redevelop existing stations unlocking opportunities for growth/regeneration along the corridor. Phase 1 (formerly Connection Stage 1) of the delivery programme relates to services between Oxford and Bletchley / Milton Keynes and is the first phase of the wider EWR programme. Major construction was completed in June 2025 and freight services are now running on this section. The Department continues to work closely with Chiltern Railways and other partners to confirm a start date for the first EWR passenger services between Oxford and Milton Keynes.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 43 - Commercial interests, Section 35 - Formulation of government policy","startDate":"2011-11-30","endDate":null,"scheduleNarrative":"Exempt under Section 35 - Formulation of government policy, Section 43 - Commercial interests","fyBaseline":13.78,"fyForecast":16.53,"fyVariance":19.9,"varianceNarrative":"The variance is due to delay of the entry into service of passenger services.","wholeLifeCost":null,"costNarrative":"Exempt under Section 35 - Formulation of government policy, Section 43 - Commercial interests","benefits":3847.15,"benefitsNarrative":"Phase 1 is in final delivery stages. Benefits are being captured via an EWR Company evaluation exercise. Some benefits will not be fully realised without progression of the later phases of EWR through Bedford to Cambridge.","themes":["Commercial & supply chain","Delivery & schedule"],"evidenceExcerpt":"Exempt under Section 43 - Commercial interests, Section 35 - Formulation of government policy Exempt under Section 35 - Formulation of government policy, Section 43 - Commercial interests","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 35 - Formulation of government policy, Section 43 - Commercial interests","narrativeClaimKind":null,"history":[{"id":"DFT_0046_2021-Q2","year":2021,"name":"East West Rail Configuration State 1","department":"DFT","category":"Infrastructure and Construction","description":"The East West Rail (EWR) programme will create a rail link from Oxford to Cambridge, and is a key part of the government's ambition for the Oxford to Cambridge Arc. EWR is being delivered as a single integrated programme, structured around the phased introduction of services (Connection Stages). East West Rail Connection Stage 1 (CS1) delivers services between Oxford and Bletchley/Milton Keynes. CS1 will re-construct and upgrade a partly disused railway between Bicester and Bletchley. This will allow for the introduction of new passenger services, improving connectivity and journey times along the corridor to support transport, housing and economic growth needs.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber.This is primarily due to the following factors: Although challenges remain (such as delivery integration with High Speed 2), the project has improved its position over the past 12 months and made progress mitigating certain risks. Key milestones have been reached and, following the 2020 Spending Review, HMT released a further �760m of funding towards delivery of the scheme.","startDate":"2011-11-30","endDate":"2025-09-01","scheduleNarrative":"The project end-date is 01 September 2025. This is primarily due to the following factors: The schedule for East West Rail (EWR) Connection Stage 1 remains ambitious, but achievable. The release of funding following the 2020 Spending Review, enabled Network Rail to enter into a target price contract for the construction phase and keep the project on schedule. Good progress has been made against important infrastructure and strategy milestones, but there is still significant work required to ensure successful delivery, including developing a suitable operating model and timetable.","fyBaseline":217.52,"fyForecast":209.94,"fyVariance":-3.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":1359.5,"costNarrative":"The projects Baseline Whole Life Cost is �1359.50m. This is primarily due to the following factors: Financials represent scheme delivery costs, rather than whole life costs. Costs in the short term largely represent the capital expenditure to deliver infrastructure, through the East West Rail Alliance. This projection includes risk elements and known scope uncertainties.","benefits":null,"benefitsNarrative":"","themes":["Delivery & schedule","Cost & funding","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber.This is primarily due to the following factors: Although challenges remain (such as delivery integration with High Speed 2), the project has improved its position over the past 12 months and made progress mitigating certain risks. Key milestones have been reached and,…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project end-date is 01 September 2025. This is primarily due to the following factors: The schedule for East West Rail (EWR) Connection Stage 1 remains ambitious, but achievable. The release of funding following the 2020 Spending Review, enabled Network Rail to enter into a target price contract for the construction phase and keep the project on schedule. Good progress has been made against important infrastructure and strategy milestones, but there is still significant work required to ensure successful delivery, including developing a suitable operating model and timetable.","narrativeClaimKind":null},{"id":"DFT_0046_2021-Q2","year":2022,"name":"East West Rail Configuration State 1","department":"DFT","category":"Infrastructure and Construction","description":"The East West Rail (EWR) scheme will create a rail link from Oxford to Cambridge, and is a key part of the government's ambition for the Oxford to Cambridge Arc. EWR is being delivered as a single integrated programme, structured around the phased introduction of services (Connection Stages). East West Rail Connection Stage 1 (CS1) delivers services between Oxford and Bletchley/Milton Keynes. CS1 will re-construct and upgrade a partly disused railway between Bicester and Bletchley. This will allow for the introduction of new passenger services, improving connectivity and journey times along the corridor to support transport and economic growth needs.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 remained at Amber. The project is progressing well and is largely on budget and schedule to deliver services by 2025. Infrastructure works have progressed well, such as those at Bletchley Flyover, and the project has made headway mitigating certain delivery risks. However, challenges still remain, including delivery integration with High Speed 2, which has the potential to impact entry into service and are being monitored and assessed closely. Operational readiness planning is a priority focus for the project.","startDate":"2011-11-30","endDate":"2025-09-01","scheduleNarrative":"Compared to 2021-Q4, your project end-date remained scheduled to finish on 01 SEP 2025. This is primarily due to the following factors: Overall the schedule remains ambitious, but achievable. Good progress has been made against important infrastructure milestones, including at Bletchley Flyover and Winslow Station. There is now increasing focus on ensuring operational readiness, for entry into service by 2025. Timetable development and progression of the operating model are important areas for progression.","fyBaseline":330.87,"fyForecast":264.98,"fyVariance":-20.0,"varianceNarrative":"The budget variance exceeds 5%. There were slight delays following the production of the baseline for the business case. Additionally, over the past 12 months there has been updated planning assumptions which have changed the profile of project spend. Certain risk forecasts are now being realised in FY2022/23, and variance is also driven by some minor delays to earthworks and structures.","wholeLifeCost":1353.0,"costNarrative":"Compared to 2021-Q4, the projects Baseline Whole Life Cost decreased from 1359.50 (£m) to 1353.13 (£m). This is primarily due to the following factors: The whole life costs for the project have been adjusted slightly to align with the approved business case. These figures represent scheme delivery costs, rather than whole life costs. Project spend largely represents the capital expenditure to deliver infrastructure, through the East West Rail Alliance.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Technical & integration"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 remained at Amber. The project is progressing well and is largely on budget and schedule to deliver services by 2025. Infrastructure works have progressed well, such as those at Bletchley Flyover, and the project has made headway…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to 2021-Q4, your project end-date remained scheduled to finish on 01 SEP 2025. This is primarily due to the following factors: Overall the schedule remains ambitious, but achievable. Good progress has been made against important infrastructure milestones, including at Bletchley Flyover and Winslow Station. There is now increasing focus on ensuring operational readiness, for entry into service by 2025. Timetable development and progression of the operating model are important areas for progression.","narrativeClaimKind":null},{"id":"DFT_0046_2021-Q2","year":2023,"name":"East West Rail Configuration State 1","department":"DFT","category":"Infrastructure and Construction","description":"The East West Rail (EWR) scheme will create a rail link from Oxford to Cambridge, and is a key part of the governments ambition for the Oxford to Cambridge Arc. EWR is being delivered as a single integrated programme, structured around the phased introduction of services (Connection Stages). East West Rail Connection Stage 1 (CS1) delivers services between Oxford and Bletchley/Milton Keynes. CS1 will re-construct and upgrade a partly disused railway between Bicester and Bletchley. This will allow for the introduction of new passenger services, improving connectivity and journey times along the corridor to support transport and economic growth needs.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. The project is progressing well and is largely on budget and schedule to deliver services by 2025. The project has made good headway, mitigating certain delivery risks. Improved delivery integration with HS2 Ltd has enhanced the management of ongoing challenges for handover in the Calvert Integration area. Operational readiness for EWR CS1 remains a priority focus. In April 2023 the Department issued a Prior Information Notice that, subject to the outcome of negotiations, Chiltern will operate EWR CS1 Services.","startDate":"2011-11-30","endDate":"2025-09-01","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2025-09-01. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2025-09-01. This is primarily due to the following factors. Overall, the schedule remains ambitious but achievable. Good progress has been made against important infrastructure milestones, including the completion of all earthworks and significant progress on track laying. The biggest risk to schedule remains the successful handover of the Calvert integration area from HS2 to EWR later this year. Important progress is being made to ensure operational readiness and the department is progressing negotiations with Chiltern at pace to formally appoint an operator for CS1 services.","fyBaseline":241.45,"fyForecast":190.37,"fyVariance":-21.0,"varianceNarrative":"The budget variance exceeds 5%. Updated planning assumptions have changed the forecast of spend, with some construction activity due to take place in later financial years than was assumed at FBC in December 2020. Whilst spend has been reforecast in this way the project continues to perform well against it's overall Anticipated Final Cost position","wholeLifeCost":1353.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 remained at 1353m. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 remained at 1353m. This is primarily due to the following factors. The whole life costs for the project have align with the approved business case. These figures represent scheme delivery costs, rather than whole life costs. Project spend largely represents the capital expenditure to deliver infrastructure, through the East West Rail Alliance. Current forecasts show the Anticipated Final Costs to be lower than the Baseline Whole Life Cost and the programme is therefore looking to rebaseline appropriately.","benefits":2649.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 2649m. The programme has developed the appropriate benefits management documentation and processes. However, the final benefits realisation position is uncertain and dependent on post-Covid travel patterns, housing and job creation; as well as the realisation of later connection stages extending services to Bedford and Cambridge. Please note the 2,654m is a nominal value and has been uplifted for each year across the appraisal period. The 574m/740m are appraisal values in 2010 prices","themes":["Cost & funding","Delivery & schedule","Technical & integration","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. The project is progressing well and is largely on budget and schedule to deliver services by 2025. The project has made good headway, mitigating certain delivery…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2025-09-01. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2025-09-01. This is primarily due to the following factors. Overall, the schedule remains ambitious but achievable. Good progress has been made against important infrastructure milestones, including the completion of all earthworks and significant progress on track laying. The biggest risk to schedule remains the successful handover of the Calvert integration area from HS2 to EWR later this year. Important progress is being made to ensure operational readiness and the department is progressing negotiations with Chiltern at pace to formally appoint an operator for CS1 services.","narrativeClaimKind":null},{"id":"DFT_0046_2021-Q2","year":2024,"name":"East West Rail Configuration State 1","department":"DFT","category":"Infrastructure and Construction","description":"The East West Rail (EWR) scheme will create a rail link from Oxford to Cambridge, and is a key part of the government's ambition for the Oxford to Cambridge Arc. EWR is being delivered as a single integrated programme, structured around the phased introduction of services (Connection Stages). East West Rail Connection Stage 1 (CS1) delivers services between Oxford and Bletchley/Milton Keynes._x000D_ _x000D_ CS1 will re-construct and upgrade a partly disused railway between Bicester and Bletchley. This will allow for the introduction of new passenger services, improving connectivity and journey times along the corridor to support transport and economic growth needs.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The project is progressing well and is largely on budget and schedule to deliver services by 2025. Infrastructure works have been completed and the Heads of Terms with the operator have been agreed and signed off. There are risks around delivery of rolling stock, mode of operation and ensuring there are enough drivers trained for the start of services. Operational readiness planning is a priority focus for the project.","startDate":"2011-11-30","endDate":"2025-09-01","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2025-09-01. This is primarily due to the following factors. Overall the schedule remains ambitious but achieveable. Good progress has been made against important infrastructure milestones, including the completion of all Earthworks and completion of track laying. Imporant progress is being made to ensure operational readiness for entry into service by 2025.","fyBaseline":124.82,"fyForecast":117.86,"fyVariance":-6.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. In year variance driven by risk funding that has been brought forward to cover the cost of mitigating industrial action (which impacted track delays) and HS2 costs","wholeLifeCost":1353.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 remained at 1353m. This is primarily due to the following factors. The whole life costs for the project have been adjusted slightly to align with the approved business case. These figures represent scheme delivery costs, rather than whole life costs. Project spend largely represents the capital expenditure to deliver infrastructure, through the East West Rail Alliance.","benefits":2649.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 2649m. The programme has developed the appropriate benefits management documentation and processes. However, the final benefits realisation position is uncertain and dependent on post-Covid travel patterns, housing and job creation; as well as the realisation of later connection stages extending services to Bedford and Cambridge. Please note the 2,654m is a nominal value and has been uplifted for each year across the appraisal period. The 574m/740m are appraisal values in 2010 prices","themes":["Cost & funding","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. The project is progressing well and is largely on budget and schedule to deliver services by 2025. Infrastructure works have been completed and the Heads of Terms…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2025-09-01. This is primarily due to the following factors. Overall the schedule remains ambitious but achieveable. Good progress has been made against important infrastructure milestones, including the completion of all Earthworks and completion of track laying. Imporant progress is being made to ensure operational readiness for entry into service by 2025.","narrativeClaimKind":null},{"id":"DFT_0046_2021-Q2","year":2025,"name":"EAST WEST RAIL CONNECTION STATE 1","department":"DfT","category":"Infrastructure and Construction","description":"The East West Rail (EWR) scheme will create a rail link from Oxford to Cambridge, and is a key part of the government’s ambition for the Oxford to Cambridge growth corridor. EWR is being delivered as a single integrated programme, structured around the phased introduction of services (Connection Stages). East West Rail Connection Stage 1 (CS1) delivers services between Oxford and Bletchley/Milton Keynes. CS1 will reconstruct and upgrade a partly disused railway between Bicester and Bletchley. This will allow for the introduction of new passenger services, improving connectivity and journey times along the corridor to support transport and economic growth needs.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The project remains broadly on budget and to schedule. The Deed of Amendment with Chiltern Railways has been signed, which officially onboards them as the Train Operating Company for CS1 services. Risk still remains over the trade union response to the mode of operation decision and how this may affect proposed time schedules to enter into service. Operational readiness planning remains a key priority focus for the project to deliver services by the end of 2025.","startDate":"2011-11-30","endDate":"2025-09-01","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 01/09/2025. This is primarily due to the following factors‚ Overall the schedule remains ambitious but achievable. There are concerns regarding entry into service, which has been delayed due to awaiting the signing of the Deed of Amendment and a decision on mode of operation, which in turn has delayed driver training. Progress is being made with stakeholders to ensure operational readiness for entry into service by 2025.","fyBaseline":124.82,"fyForecast":117.86,"fyVariance":5.58,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ In year variance driven by risk funding that has been brought forward to cover the cost of some minor snagging issues.","wholeLifeCost":1353.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 1353. This is primarily due to the following factors‚ The whole life costs for the project have been adjusted slightly to align with the approved business case. These figures represent scheme delivery costs, rather than whole life costs. Project spend largely represents the capital expenditure to deliver infrastructure, through the East West Rail Alliance.","benefits":2649.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 2649. This is primarily due to the following factors‚ CS1 is in delivery and expected to Enter into Service (EiS) in 2025. Some benefits will not be fully achieved without progression of later stages through Bedford to Cambridge (CS2/3).","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The project remains broadly on budget and to schedule. The Deed of Amendment with Chiltern Railways has been signed, which officially onboards them as the Train…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 01/09/2025. This is primarily due to the following factors‚ Overall the schedule remains ambitious but achievable. There are concerns regarding entry into service, which has been delayed due to awaiting the signing of the Deed of Amendment and a decision on mode of operation, which in turn has delayed driver training. Progress is being made with stakeholders to ensure operational readiness for entry into service by 2025.","narrativeClaimKind":null},{"id":"DFT_0046_2021-Q2","year":2026,"name":"EAST WEST RAIL CONNECTION STATE 1","department":"DFT","category":"Infrastructure and Construction","description":"East West Rail (EWR) is a new railway connecting towns and cities across the Oxford-Cambridge growth corridor. The Government has identified the corridor as a key pillar of its economic growth mission – by delivering new east-west connectivity and removing existing constraints to growth, EWR is projected to support up to 100,000 new homes, tens of thousands of new jobs and it is expected to add £6.7bn to regional GVA each year by 2050. The EWR programme is structured around the phased introduction of passenger services from the mid 2020s to the mid-late 2030s. The railway will deliver shorter journey times between key economic centres; provide greener public transport and new paths for rail freight; and provide interchanges with major rail lines, supporting onward travel across the country. It will provide a total of 8 new stations, including at Cambridge East and redevelop existing stations unlocking opportunities for growth/regeneration along the corridor. Phase 1 (formerly Connection Stage 1) of the delivery programme relates to services between Oxford and Bletchley / Milton Keynes and is the first phase of the wider EWR programme. Major construction was completed in June 2025 and freight services are now running on this section. The Department continues to work closely with Chiltern Railways and other partners to confirm a start date for the first EWR passenger services between Oxford and Milton Keynes.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 43 - Commercial interests, Section 35 - Formulation of government policy","startDate":"2011-11-30","endDate":null,"scheduleNarrative":"Exempt under Section 35 - Formulation of government policy, Section 43 - Commercial interests","fyBaseline":13.78,"fyForecast":16.53,"fyVariance":19.9,"varianceNarrative":"The variance is due to delay of the entry into service of passenger services.","wholeLifeCost":null,"costNarrative":"Exempt under Section 35 - Formulation of government policy, Section 43 - Commercial interests","benefits":3847.15,"benefitsNarrative":"Phase 1 is in final delivery stages. Benefits are being captured via an EWR Company evaluation exercise. Some benefits will not be fully realised without progression of the later phases of EWR through Bedford to Cambridge.","themes":["Commercial & supply chain","Delivery & schedule"],"evidenceExcerpt":"Exempt under Section 43 - Commercial interests, Section 35 - Formulation of government policy Exempt under Section 35 - Formulation of government policy, Section 43 - Commercial interests","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 35 - Formulation of government policy, Section 43 - Commercial interests","narrativeClaimKind":null}],"previous":{"id":"DFT_0046_2021-Q2","year":2025,"name":"EAST WEST RAIL CONNECTION STATE 1","department":"DfT","category":"Infrastructure and Construction","description":"The East West Rail (EWR) scheme will create a rail link from Oxford to Cambridge, and is a key part of the government’s ambition for the Oxford to Cambridge growth corridor. EWR is being delivered as a single integrated programme, structured around the phased introduction of services (Connection Stages). East West Rail Connection Stage 1 (CS1) delivers services between Oxford and Bletchley/Milton Keynes. CS1 will reconstruct and upgrade a partly disused railway between Bicester and Bletchley. This will allow for the introduction of new passenger services, improving connectivity and journey times along the corridor to support transport and economic growth needs.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The project remains broadly on budget and to schedule. The Deed of Amendment with Chiltern Railways has been signed, which officially onboards them as the Train Operating Company for CS1 services. Risk still remains over the trade union response to the mode of operation decision and how this may affect proposed time schedules to enter into service. Operational readiness planning remains a key priority focus for the project to deliver services by the end of 2025.","startDate":"2011-11-30","endDate":"2025-09-01","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 01/09/2025. This is primarily due to the following factors‚ Overall the schedule remains ambitious but achievable. There are concerns regarding entry into service, which has been delayed due to awaiting the signing of the Deed of Amendment and a decision on mode of operation, which in turn has delayed driver training. Progress is being made with stakeholders to ensure operational readiness for entry into service by 2025.","fyBaseline":124.82,"fyForecast":117.86,"fyVariance":5.58,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ In year variance driven by risk funding that has been brought forward to cover the cost of some minor snagging issues.","wholeLifeCost":1353.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 1353. This is primarily due to the following factors‚ The whole life costs for the project have been adjusted slightly to align with the approved business case. These figures represent scheme delivery costs, rather than whole life costs. Project spend largely represents the capital expenditure to deliver infrastructure, through the East West Rail Alliance.","benefits":2649.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 2649. This is primarily due to the following factors‚ CS1 is in delivery and expected to Enter into Service (EiS) in 2025. Some benefits will not be fully achieved without progression of later stages through Bedford to Cambridge (CS2/3).","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The project remains broadly on budget and to schedule. The Deed of Amendment with Chiltern Railways has been signed, which officially onboards them as the Train…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 01/09/2025. This is primarily due to the following factors‚ Overall the schedule remains ambitious but achievable. There are concerns regarding entry into service, which has been delayed due to awaiting the signing of the Deed of Amendment and a decision on mode of operation, which in turn has delayed driver training. Progress is being made with stakeholders to ensure operational readiness for entry into service by 2025.","narrativeClaimKind":null},"ratingDelta":null,"transition":"Not comparable","endDateDeltaDays":null,"attentionScore":7,"attentionReasons":["In-year forecast variance is +19.9%"]},{"id":"DLUHC_0135_2223-Q1","year":2026,"name":"Levelling Up Home Building Fund","department":"MHCLG","category":"Infrastructure and Construction","description":"The Home Building Fund supports small and medium sized housebuilders, infrastructure developers and residential development lenders to grow and increase supply. The fund also aims to diversify and build resilience in the housing market, foster innovation including Modern Methods of Construction and leverage greater private investment into housebuilding. Funding is provided on a recoverable basis through direct lending, equity into partnership arrangements and lending alliances with other lenders. This helps market participants to grow and creates an environment where prospective new entrants, including institutional investors, feel confident and supported to enter the residential sector and existing operators are able to increase their resilience and develop a trading record that will assist them in scaling up their businesses successfully.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Green. Most funding has been committed, with enough headroom to support projects that need further investment. Delivery is on track to meet or exceed the c.54,000 homes target, with revised forecasts increasing expected delivery to around 69,000 homes. This reflects strong progress in securing new commitments during 2025/26.","startDate":"2020-11-25","endDate":"2032-03-31","scheduleNarrative":"There has been no change to the schedule for the programme.","fyBaseline":575.41,"fyForecast":474.75,"fyVariance":17.49,"varianceNarrative":"The budget variance exceeds 5%. The in-year reduction in expenditure was primarily driven by subdued market activity and reduced confidence among Subject Matter Experts (SME). This led to a slower pace in contracting new projects than originally anticipated, resulting in delays to site commencement. Consequently, some planned expenditure for 2025/26 was deferred into the 2026/27 financial year and beyond.","wholeLifeCost":1990.98,"costNarrative":"The WLC remains unchanged, despite the need for some reprofiling across financial years.","benefits":1675.47,"benefitsNarrative":"The monetised benefits relate to those associated with the additional housing impacts of the programme. These benefits are a high level estimate based on the Value for Money (VfM) assessment for projects as they are monitored and flow through the Assessment Framework (AF). The monetised benefits are primarily based on estimating the Land Value Uplift (LVU) from a change in productive use, in line with MHCLG appraisal guidance and the VfM framework for the programme.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Governance & assurance"],"evidenceExcerpt":"The SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Green. Most funding has been committed, with enough headroom to support projects that need further investment. Delivery is on track to meet or exceed the c.54,000 homes target, with revised forecasts increasing expected delivery to around 69,000 homes. This reflects strong progress…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"There has been no change to the schedule for the programme.","narrativeClaimKind":null,"history":[{"id":"DLUHC_0135_2223-Q1","year":2023,"name":"Levelling Up Home Building Fund","department":"DLUHC","category":"Infrastructure and Construction","description":"The Levelling Up Home Building Fund will support small and medium sized housebuilders and residential development lenders to diversify and build resilience in the housing market, foster innovation including Modern Methods of Construction and leverage greater private investment into housebuilding. Funding is provided on a recoverable basis through loans or equity into partnership arrangements. This will help create an environment where prospective new entrants, including institutional investors, feel confident and supported to enter the residential sector and existing operators are able to increase their resilience and develop a trading record that will assist them in scaling up their businesses successfully.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 is Amber. This is primarily due to the following factors. The programmes delivery confidence assessment has not yet been assessed by the IPA given this is the first year of operation but has been rated at Amber by the funds Senior Responsible Officer. This reflects the impact of the turbulent economic conditions, during the last financial year (22/23), on the demand for finance by small and medium sized developers (also known as SMEs). Evidence from the market resulted in hesitance to commence and progress new schemes given the economic uncertainty and take-up for funding consequently fell short of original forecasts. However, there has been some level of improvement in market conditions since the new year and additional measures are ongoing or being considered to support delivery and SME developers over the life of the programme","startDate":"2020-11-25","endDate":"2031-03-31","scheduleNarrative":"The project's end-date at 22/23-Q4 is 2031-03-31. This is primarily due to the following factors. The programme remains on schedule for completion by March 2031, being the date by which loans or investments funded under the programme should be realised and/or repaid.","fyBaseline":273.0,"fyForecast":120.0,"fyVariance":-56.0,"varianceNarrative":"The variance to budget exceeds 5% due to the economic challenges for small and medium sized developers arising over the course of the financial year. These included inflationary and supply chain pressures arising following the reopening of the global economy post pandemic, later compounded by rising interest rates, tightening liquidity conditions and weaker consumer demand. This led to a decline in the appetite for developers and investors to acquire and/or develop new sites, with a consequent impact on the demand for development finance and investment.","wholeLifeCost":2206.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 22/23-Q4 is 2206m. This is primarily due to the following factors. There has been no change to the Baseline Whole Life Cost over the course of the year.","benefits":842.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 842m. The project's departmental-agree monetised benefits at 22/23-Q4 is 842m. In addition to the receipts due back from the investment, there are lifetime benefits of the programme, these are based on estimating the social value delivered by the additional housing unlocked by the programme. These have fallen slightly; this is driven by changes to the estimate of Net Present Social Value (NPSV). The primary monetised benefit is the Land Value Uplift (LVU) from a change in productive use of the land towards housing which acts as a proxy of the welfare gain enjoyed by new residents.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain"],"evidenceExcerpt":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 is Amber. This is primarily due to the following factors. The programmes delivery confidence assessment has not yet been assessed by the IPA given this is the first year of operation but has been rated at Amber by the funds Senior Responsible Officer. This reflects the impact…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 22/23-Q4 is 2031-03-31. This is primarily due to the following factors. The programme remains on schedule for completion by March 2031, being the date by which loans or investments funded under the programme should be realised and/or repaid.","narrativeClaimKind":null},{"id":"DLUHC_0135_2223-Q1","year":2024,"name":"Levelling Up Home Building Fund","department":"DLUHC","category":"Infrastructure and Construction","description":"The Levelling Up Home Building Fund allocates funding to small and medium sized housebuilders and residential development lenders to diversify and build resilience in the housing market as well as foster innovation including Modern Methods of Construction.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. As at March 24: We continue to assess the delivery confidence of the programme as amber.","startDate":"2020-11-25","endDate":"2031-03-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2031-03-31. This is primarily due to the following factors. As at March 24: The project's end-date is March 2031.","fyBaseline":507.0,"fyForecast":191.17,"fyVariance":-62.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. Some costs have moved into future financial years.","wholeLifeCost":2206.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 remained at 2206m. This is primarily due to the following factors. Whole Life Costs have not changed","benefits":842.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 842m. Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 842m.","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Amber. This is primarily due to the following factors. As at March 24: We continue to assess the delivery confidence of the programme as amber. Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2031-03-31. This is primarily due to the following factors. As at March 24: The project's end-date is March 2031.","narrativeClaimKind":null},{"id":"DLUHC_0135_2223-Q1","year":2025,"name":"Levelling Up Home Building Fund","department":"MHCLG","category":"Infrastructure and Construction","description":"The Home Building Fund supports small and medium sized housebuilders and residential development lenders to grow and increase supply. The fund also aims to diversify and build resilience in the housing market, foster innovation including Modern Methods of Construction and leverage greater private investment into housebuilding. Funding is provided on a recoverable basis through direct lending, equity into partnership arrangements and lending alliances with other lenders. This helps market participants to grow and creates an environment where prospective new entrants, including institutional investors, feel confident and supported to enter the residential sector and existing operators are able to increase their resilience and develop a trading record that will assist them in scaling up their businesses successfully.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors‚ The approval of the revised Business Case and extension of the fund at the end of 2024, has allowed for commitments to continue through to the end of March 2026 which is expected will allow for the full fund to be committed and subsequently delivered. The aim is for the full programme allocation to be drawn down and the expectation that the new homes targets will be achieved or exceeded - and the new target brings expected supported delivery up to 54k homes. Performance from 24/25 (with stabler economic & development landscape conditions) and in signing new commitments has enabled significant progress towards meeting final forecasts.","startDate":"2020-11-25","endDate":"2032-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2031 to 31/03/2032. This is primarily due to the following factors‚ The approval of the revised Business Case and extension of the fund at the end of 2024, has allowed for commitments to continue through to the end of March 2026 which will allow for the full fund to be committed and subsequently delivered. The additional period for deployment reflects challenging market conditions and lower sector activity between 2022 and 2024.","fyBaseline":216.94,"fyForecast":257.8,"fyVariance":18.83,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The project has overperformed on fund deployment in 24/25 compared to the original budget. At the end of the year the outturn was overachieved largely due to new projects being brought into the programme that were not originally anticipated at the beginning of the year.","wholeLifeCost":2076.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 2206 to 2076. This is primarily due to the following factors‚ The approval of the revised Business Case. The whole life costs are expected to be lower than originally forecast - but given the impacts of the private sector capital leveraged by the HBF, this reduced spend is still set deliver the forecasted outputs.","benefits":1850.1,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 842 to 1850. This is primarily due to the following factors‚ Changes to the total number of housing outputs since the baseline position with outputs increasing significantly in 24/25 to reflect extension of the programme and revisions made to how the benefits are estimated, which has been informed by monitoring data of live projects being delivered under the programme.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors‚ The approval of the revised Business Case and extension of the fund at the end of 2024, has allowed for commitments to continue through to the end of…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2031 to 31/03/2032. This is primarily due to the following factors‚ The approval of the revised Business Case and extension of the fund at the end of 2024, has allowed for commitments to continue through to the end of March 2026 which will allow for the full fund to be committed and subsequently delivered. The additional period for deployment reflects challenging market conditions and lower sector activity between 2022 and 2024.","narrativeClaimKind":null},{"id":"DLUHC_0135_2223-Q1","year":2026,"name":"Levelling Up Home Building Fund","department":"MHCLG","category":"Infrastructure and Construction","description":"The Home Building Fund supports small and medium sized housebuilders, infrastructure developers and residential development lenders to grow and increase supply. The fund also aims to diversify and build resilience in the housing market, foster innovation including Modern Methods of Construction and leverage greater private investment into housebuilding. Funding is provided on a recoverable basis through direct lending, equity into partnership arrangements and lending alliances with other lenders. This helps market participants to grow and creates an environment where prospective new entrants, including institutional investors, feel confident and supported to enter the residential sector and existing operators are able to increase their resilience and develop a trading record that will assist them in scaling up their businesses successfully.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Green. Most funding has been committed, with enough headroom to support projects that need further investment. Delivery is on track to meet or exceed the c.54,000 homes target, with revised forecasts increasing expected delivery to around 69,000 homes. This reflects strong progress in securing new commitments during 2025/26.","startDate":"2020-11-25","endDate":"2032-03-31","scheduleNarrative":"There has been no change to the schedule for the programme.","fyBaseline":575.41,"fyForecast":474.75,"fyVariance":17.49,"varianceNarrative":"The budget variance exceeds 5%. The in-year reduction in expenditure was primarily driven by subdued market activity and reduced confidence among Subject Matter Experts (SME). This led to a slower pace in contracting new projects than originally anticipated, resulting in delays to site commencement. Consequently, some planned expenditure for 2025/26 was deferred into the 2026/27 financial year and beyond.","wholeLifeCost":1990.98,"costNarrative":"The WLC remains unchanged, despite the need for some reprofiling across financial years.","benefits":1675.47,"benefitsNarrative":"The monetised benefits relate to those associated with the additional housing impacts of the programme. These benefits are a high level estimate based on the Value for Money (VfM) assessment for projects as they are monitored and flow through the Assessment Framework (AF). The monetised benefits are primarily based on estimating the Land Value Uplift (LVU) from a change in productive use, in line with MHCLG appraisal guidance and the VfM framework for the programme.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Governance & assurance"],"evidenceExcerpt":"The SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at Green. Most funding has been committed, with enough headroom to support projects that need further investment. Delivery is on track to meet or exceed the c.54,000 homes target, with revised forecasts increasing expected delivery to around 69,000 homes. This reflects strong progress…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"There has been no change to the schedule for the programme.","narrativeClaimKind":null}],"previous":{"id":"DLUHC_0135_2223-Q1","year":2025,"name":"Levelling Up Home Building Fund","department":"MHCLG","category":"Infrastructure and Construction","description":"The Home Building Fund supports small and medium sized housebuilders and residential development lenders to grow and increase supply. The fund also aims to diversify and build resilience in the housing market, foster innovation including Modern Methods of Construction and leverage greater private investment into housebuilding. Funding is provided on a recoverable basis through direct lending, equity into partnership arrangements and lending alliances with other lenders. This helps market participants to grow and creates an environment where prospective new entrants, including institutional investors, feel confident and supported to enter the residential sector and existing operators are able to increase their resilience and develop a trading record that will assist them in scaling up their businesses successfully.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors‚ The approval of the revised Business Case and extension of the fund at the end of 2024, has allowed for commitments to continue through to the end of March 2026 which is expected will allow for the full fund to be committed and subsequently delivered. The aim is for the full programme allocation to be drawn down and the expectation that the new homes targets will be achieved or exceeded - and the new target brings expected supported delivery up to 54k homes. Performance from 24/25 (with stabler economic & development landscape conditions) and in signing new commitments has enabled significant progress towards meeting final forecasts.","startDate":"2020-11-25","endDate":"2032-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2031 to 31/03/2032. This is primarily due to the following factors‚ The approval of the revised Business Case and extension of the fund at the end of 2024, has allowed for commitments to continue through to the end of March 2026 which will allow for the full fund to be committed and subsequently delivered. The additional period for deployment reflects challenging market conditions and lower sector activity between 2022 and 2024.","fyBaseline":216.94,"fyForecast":257.8,"fyVariance":18.83,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The project has overperformed on fund deployment in 24/25 compared to the original budget. At the end of the year the outturn was overachieved largely due to new projects being brought into the programme that were not originally anticipated at the beginning of the year.","wholeLifeCost":2076.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 2206 to 2076. This is primarily due to the following factors‚ The approval of the revised Business Case. The whole life costs are expected to be lower than originally forecast - but given the impacts of the private sector capital leveraged by the HBF, this reduced spend is still set deliver the forecasted outputs.","benefits":1850.1,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 842 to 1850. This is primarily due to the following factors‚ Changes to the total number of housing outputs since the baseline position with outputs increasing significantly in 24/25 to reflect extension of the programme and revisions made to how the benefits are estimated, which has been informed by monitoring data of live projects being delivered under the programme.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors‚ The approval of the revised Business Case and extension of the fund at the end of 2024, has allowed for commitments to continue through to the end of…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2031 to 31/03/2032. This is primarily due to the following factors‚ The approval of the revised Business Case and extension of the fund at the end of 2024, has allowed for commitments to continue through to the end of March 2026 which will allow for the full fund to be committed and subsequently delivered. The additional period for deployment reflects challenging market conditions and lower sector activity between 2022 and 2024.","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":0,"attentionScore":6,"attentionReasons":["In-year forecast variance is +17.5%"]},{"id":"MOD_0247_2324-Q1","year":2026,"name":"Future Materials Campus","department":"MOD","category":"Military Capability","description":"The Future Materials Campus (FMC) programme will renew existing facilities for the manufacture and storage of nuclear materials, improve science and analysis capabilities, and invest in renewed capability for material recovery.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 24 - National security","startDate":"2023-08-16","endDate":null,"scheduleNarrative":"Exempt under Section 24 - National security","fyBaseline":459.43,"fyForecast":501.64,"fyVariance":9.19,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the budget for Future Materials Campus projects being reduced following a holistic review of the wider warhead portfolio costed plan. Furthermore, forecast estimates from Future Materials Campus programme had not been fully reflected in the budget.","wholeLifeCost":null,"costNarrative":"Exempt under Section 22 - Information intended for future publication","benefits":null,"benefitsNarrative":"Compared to financial year 2024/25-Q4, the project's departmental-agreed monetised benefits at 2025/26-Q4 remained at £0m.","themes":["Cost & funding","Governance & assurance"],"evidenceExcerpt":"Exempt under Section 24 - National security Exempt under Section 24 - National security","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 24 - National security","narrativeClaimKind":null,"history":[{"id":"MOD_0247_2324-Q1","year":2024,"name":"Future Materials Campus","department":"MOD","category":"Military Capability","description":"The Future Materials Campus (FMC) programme will renew existing facilities for the manufacture and storage of nuclear materials, improve science and analysis capabilities, and invest in renewed capability for material recovery.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. Scale, complexity and challenge of the Programme. In 2023 the FMC programme was established that draws together a number of infrastructure facilities into a single programme of activity that when completed will deliver the manufacture and storage of nuclear materials. The projects have interconnected schedules, common activities and overlapping requirements for resources. The change in approach to that of an integrated programme is the most effective means of maximising efficiencies.","startDate":"2023-08-16","endDate":null,"scheduleNarrative":"Exempt under Sections 24 and 26 of the Freedom of Information Act 2000","fyBaseline":673.47,"fyForecast":327.57,"fyVariance":-51.361,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The budget for the Future Material Campus Programme was reduced following a holistic review of the wider warhead portfolio costed plan and in conjunction with forecast estimates from the Future Materials Campus Programme.","wholeLifeCost":222000.0,"costNarrative":"FMC is bringing together a range of projects at differing levels of maturity, with elements of concept development still ongoing. As such the whole life cost modelling and subsequent analysis remains under development.","benefits":0.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 0m.","themes":["Cost & funding","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. Scale, complexity and challenge of the Programme. In 2023 the FMC programme was established that draws together a number of infrastructure facilities into a single programme of activity that when completed will…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Sections 24 and 26 of the Freedom of Information Act 2000","narrativeClaimKind":null},{"id":"MOD_0247_2324-Q1","year":2025,"name":"Future Materials Campus","department":"MoD","category":"Military Capability","description":"The Future Materials Campus programme will renew existing facilities for the manufacture and storage of nuclear materials, improve science and analysis capabilities, and invest in renewed capability for material recovery.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Section 24 - National security","startDate":"2023-08-16","endDate":null,"scheduleNarrative":"Section 24 - National security","fyBaseline":510.03,"fyForecast":406.19,"fyVariance":20.36,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The budget for Future Materials Campus projects being reduced following a holistic review of the wider warhead portfolio costed plan. Furthermore, forecast estimates from Future Materials Campus programme had not been fully reflected in the budget.","wholeLifeCost":null,"costNarrative":"Section 22 - Information intended for future publication","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits","themes":["Cost & funding","Governance & assurance"],"evidenceExcerpt":"Section 24 - National security Section 24 - National security","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Section 24 - National security","narrativeClaimKind":null},{"id":"MOD_0247_2324-Q1","year":2026,"name":"Future Materials Campus","department":"MOD","category":"Military Capability","description":"The Future Materials Campus (FMC) programme will renew existing facilities for the manufacture and storage of nuclear materials, improve science and analysis capabilities, and invest in renewed capability for material recovery.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 24 - National security","startDate":"2023-08-16","endDate":null,"scheduleNarrative":"Exempt under Section 24 - National security","fyBaseline":459.43,"fyForecast":501.64,"fyVariance":9.19,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the budget for Future Materials Campus projects being reduced following a holistic review of the wider warhead portfolio costed plan. Furthermore, forecast estimates from Future Materials Campus programme had not been fully reflected in the budget.","wholeLifeCost":null,"costNarrative":"Exempt under Section 22 - Information intended for future publication","benefits":null,"benefitsNarrative":"Compared to financial year 2024/25-Q4, the project's departmental-agreed monetised benefits at 2025/26-Q4 remained at £0m.","themes":["Cost & funding","Governance & assurance"],"evidenceExcerpt":"Exempt under Section 24 - National security Exempt under Section 24 - National security","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 24 - National security","narrativeClaimKind":null}],"previous":{"id":"MOD_0247_2324-Q1","year":2025,"name":"Future Materials Campus","department":"MoD","category":"Military Capability","description":"The Future Materials Campus programme will renew existing facilities for the manufacture and storage of nuclear materials, improve science and analysis capabilities, and invest in renewed capability for material recovery.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Section 24 - National security","startDate":"2023-08-16","endDate":null,"scheduleNarrative":"Section 24 - National security","fyBaseline":510.03,"fyForecast":406.19,"fyVariance":20.36,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The budget for Future Materials Campus projects being reduced following a holistic review of the wider warhead portfolio costed plan. Furthermore, forecast estimates from Future Materials Campus programme had not been fully reflected in the budget.","wholeLifeCost":null,"costNarrative":"Section 22 - Information intended for future publication","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits","themes":["Cost & funding","Governance & assurance"],"evidenceExcerpt":"Section 24 - National security Section 24 - National security","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Section 24 - National security","narrativeClaimKind":null},"ratingDelta":null,"transition":"Not comparable","endDateDeltaDays":null,"attentionScore":3,"attentionReasons":["In-year forecast variance is +9.2%"]},{"id":"DEFRA_0015_2122-Q1","year":2026,"name":"NORTHERN IRELAND","department":"DEFRA","category":"Government Transformation and Service Delivery","description":"The Defra Northern Ireland Programme was formed in January 2021 and was led by the Northern Ireland, Biosecurity and Trade Directorate. Its objectives were to ensure an enduring, operable NI/GB boundary for all Defra stakeholders and the ongoing integrity and efficacy of Defra's regulatory regimes in the context of the Windsor Framework, working collaboratively with devolved governments. This was achieved by implementing the UK Government’s commitments under the Windsor Framework, ensuring smooth trade between Great Britain (GB) and NI, while maintaining biosecurity and supporting the UK internal market.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Delivery confidence for the Northern Ireland Programme is green as the Programme successfully closed on time and budget. The programme successfully delivered its objective to implement the Windsor Framework requirements. It delivered 15 projects, including three major schemes covering retail movement, plant health labelling and pet travel. The Programme facilitated the movement of goods and pets with reduced friction, delivered enabling infrastructure, including Sanitary and Phytosanitary (SPS) facilities at ports and implemented digital solutions for compliance and risk-based checks. It has successfully transitioned all NI schemes to enduring Senior Service Ownership under Northern Ireland Strategy & Services.","startDate":"2021-01-01","endDate":"2026-02-11","scheduleNarrative":"The programme implemented multi-disciplinary teams and accelerated delivery to compress timeframes and achieve deliverables. Closing projects in a timely way, paralleled with agile and effective programme management allowed the closure of the programme to be brought forward.","fyBaseline":87.1,"fyForecast":78.46,"fyVariance":9.92,"varianceNarrative":"Budget variance is due to the final figures on actual spend produced at the end of the financial year, compared to the anticipated programme closure figures which formed the baseline. The lower actual spend was due to effective early closure of the Programme which reduced staff costs faster than originally anticipated.","wholeLifeCost":430.55,"costNarrative":"Forecasts were improved in accuracy throughout the delivery year but have now been replaced by known actual spend. This combined with the accelerated and efficient closure of the programme decreased digital costs and reduced the whole life cost of the programme.","benefits":1548.28,"benefitsNarrative":"There has been no change in Programme benefits. The post-programme evaluation is ongoing and will inform any changes in benefits figures.","themes":["Cost & funding","Delivery & schedule","Technical & integration","Workforce & capability"],"evidenceExcerpt":"Delivery confidence for the Northern Ireland Programme is green as the Programme successfully closed on time and budget. The programme successfully delivered its objective to implement the Windsor Framework requirements. It delivered 15 projects, including three major schemes covering retail movement, plant health labelling and pet travel. The Programme…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The programme implemented multi-disciplinary teams and accelerated delivery to compress timeframes and achieve deliverables. Closing projects in a timely way, paralleled with agile and effective programme management allowed the closure of the programme to be brought forward.","narrativeClaimKind":null,"history":[{"id":"DEFRA_0015_2122-Q1","year":2022,"name":"Northern Ireland Programme","department":"DEFRA","category":"Government Transformation and Service Delivery","description":"The Defra Northern Ireland Programme was formed in January 2021 and is led by the newly formed NI Directorate. It aims to ensure an enduring, operable NI/GB boundary for all Defra stakeholders, and the ongoing integrity and efficacy of Defra's regulatory regimes in the context of the NI Protocol, working collaboratively with the devolved administrations. The high-level strategic objectives of the programme are to: . Ensure compliance with the NI Protocol . Mitigate the impacts of the NIP implementation for businesses trading into and out of Northern Ireland . Minimise the impact of NIP implementation on consumers","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 27 of the Freedom of Information Act 2000 (International Relations).","startDate":null,"endDate":null,"scheduleNarrative":"Exempt under Section 27 of the Freedom of Information Act 2000 (International Relations).","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 27 of the Freedom of Information Act 2000 (International Relations).","wholeLifeCost":null,"costNarrative":"Exempt under Section 27 of the Freedom of Information Act 2000 (International Relations).","benefits":null,"benefitsNarrative":"","themes":[],"evidenceExcerpt":"Exempt under Section 27 of the Freedom of Information Act 2000 (International Relations). Exempt under Section 27 of the Freedom of Information Act 2000 (International Relations).","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 27 of the Freedom of Information Act 2000 (International Relations).","narrativeClaimKind":null},{"id":"DEFRA_0015_2122-Q1","year":2023,"name":"Northern Ireland Programme","department":"DEFRA","category":"Government Transformation and Service Delivery","description":"The Defra Northern Ireland Programme was formed in January 2021 and is led by the NI Directorate. It aims to ensure an enduring, operable NI/GB boundary for all Defra stakeholders, and the ongoing integrity and efficacy of Defras regulatory regimes in the context of the Windsor Framework, working collaboratively with the devolved administrations. The high-level strategic objectives of the programme are to: Ensure compliance with the Windsor Framework Mitigate the impacts of the WF implementation for businesses trading into and out of Northern Ireland Minimise the impact of WF implementation on consumers","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","startDate":null,"endDate":null,"scheduleNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","themes":["Commercial & supply chain"],"evidenceExcerpt":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests. Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","narrativeClaimKind":null},{"id":"DEFRA_0015_2122-Q1","year":2024,"name":"Northern Ireland Programme","department":"DEFRA","category":"Government Transformation and Service Delivery","description":"The Defra Northern Ireland Programme was formed in January 2021 and is led by the NI Directorate. It aims to ensure an enduring, operable NI/GB boundary for all Defra stakeholders, and the ongoing integrity and efficacy of Defra's regulatory regimes in the context of the Windsor Framework, working collaboratively with the devolved administrations. _x000D_ The high-level strategic objectives of the programme are to: _x000D_ Ensure compliance with the Windsor Framework_x000D_ Mitigate the impacts of the WF implementation for businesses trading into and out of Northern Ireland _x000D_ Minimise the impact of WF implementation on consumers","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. Whilst the programme successfully delivered Phase 1 deliverables on schedule enabling the 1st October launch of NI Retail Movement Scheme (NIRMS) and NI Plant Health Label scheme (NIPHL); our overall delivery confidence for the rest of the programme remains at AMBER. Current work to prepare and baseline plans for Phase 2 was completed on 22/02/2024, with the exception of Post & Parcels project (project 6), draft plan due to be validated in April. Pets will also need to review and baseline its plans.","startDate":"2021-01-01","endDate":"2025-06-01","scheduleNarrative":"The project's end-date at 23/24-Q4 is 2025-06-01. This is primarily due to the following factors. Programme still on track to deliver as planned","fyBaseline":167.69,"fyForecast":101.37,"fyVariance":-40.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The NI Programme has permission to spend to 40m in 23/24 for the Labelling Grant Scheme. Business uptake has been less than originally anticipated and totalling 1.7m; underspend will be surrendered at main estimates. The 23/24 approved position for NI SPS Infrastructure has been revised down (from 58.1m in the business case - capital costs were covered from underspends elsewhere in Defra so did not form a part of the Departments overall Supplementary Estimates bid to HMT.","wholeLifeCost":467.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 23/24-Q4 is 467m. This is primarily due to the following factors. The budgeted whole life cost for the Programme has increased as a result of inclusion of SPS Infrastructure (192.3m) and Labelling (40m).","benefits":0.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 0m. Previous updates were based on two business cases covering MAS and DAS projects. These cases will be superseded by the consolidated Windsor Framework programme business case for Investment Committee consideration in May 2024. Project benefit workshops facilitated by business analysts gather benefit information to make programme level decisions about the availability and robustness of the data/evidence to help determine the confidence level in the realisation of project and programme benefits. Analysts are also leading on refreshing the Theory of Change to integrate Defra's new strategic goals and further consider alignment with new programme outcomes and benefits. _x000D_ _x000D_ The WF Business Case benefit realisation plan and benefit map will include selected project end benefits to be treated as 'intermediary' benefits at programme-level, These intermediary benefits will be used to monitor NID programme end benefits. The development of programme end benefits remain in pursuit of the primary economic benefits of trade continuity between GB and NI and the secondary objective to ensure compliance needed to uphold the Belfast (Good Friday) Agreement.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. Whilst the programme successfully delivered Phase 1 deliverables on schedule enabling the 1st October launch of NI Retail Movement Scheme (NIRMS) and NI Plant Health Label scheme (NIPHL); our overall delivery confidence…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 23/24-Q4 is 2025-06-01. This is primarily due to the following factors. Programme still on track to deliver as planned","narrativeClaimKind":null},{"id":"DEFRA_0015_2122-Q1","year":2025,"name":"NORTHERN IRELAND","department":"DEFRA","category":"Government Transformation and Service Delivery","description":"The Defra Northern Ireland Programme was formed in January 2021 and is led by the NI, Biosecurity, and Trade Directorate. It aims to ensure an enduring, operable NI/GB boundary for all Defra stakeholders, and the ongoing integrity and efficacy of Defra’s regulatory regimes in the context of the Windsor Framework, working collaboratively with the devolved governments. The programme is committed to implementing the Windsor Framework in good faith and taking all steps necessary to protect the UK’s internal market.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Following the election and the Government's focus on full and faithful implementation of the Windsor Framework we rebaselined delivery plans. This enabled successful delivery and early closure of projects, alongside a refreshed programme business case. This shifted the programme from 'red' status to 'amber'. Challenges remain, including tight timescales (although key milestones are on track), limited contingency levels, and identification of resource to support delivery and movement to enduring business as usual. The prioritisation of stakeholder engagement to ensure all partners are involved, content and reassured requires a high level of focus and resource to drive progress. The complexities of this process contribute to the programme's amber status.","startDate":"2021-01-01","endDate":"2026-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 01/06/2025 to 31/03/2026. This is primarily due to the following factors‚ The Programme refined the planned decommissioning of Sanitary/Phytosanitary facilities. This amended the schedule for this decommissioning and expanded the length of time required for completion. The programme is now targeted for closure on 31 March 2026, while defining milestone and legislative timelines through work with partners.","fyBaseline":178.1,"fyForecast":178.1,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":544.46,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 467 to 544. This is primarily due to the following factors‚ As part of the spending review, costs were refined and extrapolated across the whole programme to better define the whole life cost. Digital costs increased, as did costs for the Movement Assistance Scheme (reimbursement for costs of certification). The costs of infrastructure for Sanitary/Phytosanitary costs increased, as did funding for operational delivery partners. In addition, the programme business as usual costs were extended to include delivery after programme closure through to FY 32/33.","benefits":1548.28,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 0 to 1548. This is primarily due to the following factors‚ The variation between the financial year reports reflects the progression of the business cases into a more comprehensive Programme Business Case. Baseline benefit figures were not available for the 23/24 Q4 report due to a lack of reliable data at the programme level. As the Programme level business case has been refreshed, associated benefits have similarly been updated with improved detail. This encompasses component business cases which have been recently updated and complement the programme business case (reflecting the complexity of the programme structure). Baseline figures have been reworked to reflect the net benefits, mirroring the actual/forecast scenarios more accurately. Following the Programme Business Case approval, benefits analysis and modelling has been improved. Updating the GDP (Gross Domestic Product) deflator for 2023 has updated and changed on benefit values were assessed. These were previously based on real prices for financial year 19/20.","themes":["Delivery & schedule","Cost & funding","Approvals & decisions","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Following the election and the Government's focus on full and faithful implementation of the Windsor Framework we rebaselined delivery plans. This enabled successful…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 01/06/2025 to 31/03/2026. This is primarily due to the following factors‚ The Programme refined the planned decommissioning of Sanitary/Phytosanitary facilities. This amended the schedule for this decommissioning and expanded the length of time required for completion. The programme is now targeted for closure on 31 March 2026, while defining milestone and legislative timelines through work with partners.","narrativeClaimKind":null},{"id":"DEFRA_0015_2122-Q1","year":2026,"name":"NORTHERN IRELAND","department":"DEFRA","category":"Government Transformation and Service Delivery","description":"The Defra Northern Ireland Programme was formed in January 2021 and was led by the Northern Ireland, Biosecurity and Trade Directorate. Its objectives were to ensure an enduring, operable NI/GB boundary for all Defra stakeholders and the ongoing integrity and efficacy of Defra's regulatory regimes in the context of the Windsor Framework, working collaboratively with devolved governments. This was achieved by implementing the UK Government’s commitments under the Windsor Framework, ensuring smooth trade between Great Britain (GB) and NI, while maintaining biosecurity and supporting the UK internal market.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Delivery confidence for the Northern Ireland Programme is green as the Programme successfully closed on time and budget. The programme successfully delivered its objective to implement the Windsor Framework requirements. It delivered 15 projects, including three major schemes covering retail movement, plant health labelling and pet travel. The Programme facilitated the movement of goods and pets with reduced friction, delivered enabling infrastructure, including Sanitary and Phytosanitary (SPS) facilities at ports and implemented digital solutions for compliance and risk-based checks. It has successfully transitioned all NI schemes to enduring Senior Service Ownership under Northern Ireland Strategy & Services.","startDate":"2021-01-01","endDate":"2026-02-11","scheduleNarrative":"The programme implemented multi-disciplinary teams and accelerated delivery to compress timeframes and achieve deliverables. Closing projects in a timely way, paralleled with agile and effective programme management allowed the closure of the programme to be brought forward.","fyBaseline":87.1,"fyForecast":78.46,"fyVariance":9.92,"varianceNarrative":"Budget variance is due to the final figures on actual spend produced at the end of the financial year, compared to the anticipated programme closure figures which formed the baseline. The lower actual spend was due to effective early closure of the Programme which reduced staff costs faster than originally anticipated.","wholeLifeCost":430.55,"costNarrative":"Forecasts were improved in accuracy throughout the delivery year but have now been replaced by known actual spend. This combined with the accelerated and efficient closure of the programme decreased digital costs and reduced the whole life cost of the programme.","benefits":1548.28,"benefitsNarrative":"There has been no change in Programme benefits. The post-programme evaluation is ongoing and will inform any changes in benefits figures.","themes":["Cost & funding","Delivery & schedule","Technical & integration","Workforce & capability"],"evidenceExcerpt":"Delivery confidence for the Northern Ireland Programme is green as the Programme successfully closed on time and budget. The programme successfully delivered its objective to implement the Windsor Framework requirements. It delivered 15 projects, including three major schemes covering retail movement, plant health labelling and pet travel. The Programme…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The programme implemented multi-disciplinary teams and accelerated delivery to compress timeframes and achieve deliverables. Closing projects in a timely way, paralleled with agile and effective programme management allowed the closure of the programme to be brought forward.","narrativeClaimKind":null}],"previous":{"id":"DEFRA_0015_2122-Q1","year":2025,"name":"NORTHERN IRELAND","department":"DEFRA","category":"Government Transformation and Service Delivery","description":"The Defra Northern Ireland Programme was formed in January 2021 and is led by the NI, Biosecurity, and Trade Directorate. It aims to ensure an enduring, operable NI/GB boundary for all Defra stakeholders, and the ongoing integrity and efficacy of Defra’s regulatory regimes in the context of the Windsor Framework, working collaboratively with the devolved governments. The programme is committed to implementing the Windsor Framework in good faith and taking all steps necessary to protect the UK’s internal market.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Following the election and the Government's focus on full and faithful implementation of the Windsor Framework we rebaselined delivery plans. This enabled successful delivery and early closure of projects, alongside a refreshed programme business case. This shifted the programme from 'red' status to 'amber'. Challenges remain, including tight timescales (although key milestones are on track), limited contingency levels, and identification of resource to support delivery and movement to enduring business as usual. The prioritisation of stakeholder engagement to ensure all partners are involved, content and reassured requires a high level of focus and resource to drive progress. The complexities of this process contribute to the programme's amber status.","startDate":"2021-01-01","endDate":"2026-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 01/06/2025 to 31/03/2026. This is primarily due to the following factors‚ The Programme refined the planned decommissioning of Sanitary/Phytosanitary facilities. This amended the schedule for this decommissioning and expanded the length of time required for completion. The programme is now targeted for closure on 31 March 2026, while defining milestone and legislative timelines through work with partners.","fyBaseline":178.1,"fyForecast":178.1,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":544.46,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 467 to 544. This is primarily due to the following factors‚ As part of the spending review, costs were refined and extrapolated across the whole programme to better define the whole life cost. Digital costs increased, as did costs for the Movement Assistance Scheme (reimbursement for costs of certification). The costs of infrastructure for Sanitary/Phytosanitary costs increased, as did funding for operational delivery partners. In addition, the programme business as usual costs were extended to include delivery after programme closure through to FY 32/33.","benefits":1548.28,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 0 to 1548. This is primarily due to the following factors‚ The variation between the financial year reports reflects the progression of the business cases into a more comprehensive Programme Business Case. Baseline benefit figures were not available for the 23/24 Q4 report due to a lack of reliable data at the programme level. As the Programme level business case has been refreshed, associated benefits have similarly been updated with improved detail. This encompasses component business cases which have been recently updated and complement the programme business case (reflecting the complexity of the programme structure). Baseline figures have been reworked to reflect the net benefits, mirroring the actual/forecast scenarios more accurately. Following the Programme Business Case approval, benefits analysis and modelling has been improved. Updating the GDP (Gross Domestic Product) deflator for 2023 has updated and changed on benefit values were assessed. These were previously based on real prices for financial year 19/20.","themes":["Delivery & schedule","Cost & funding","Approvals & decisions","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Following the election and the Government's focus on full and faithful implementation of the Windsor Framework we rebaselined delivery plans. This enabled successful…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 01/06/2025 to 31/03/2026. This is primarily due to the following factors‚ The Programme refined the planned decommissioning of Sanitary/Phytosanitary facilities. This amended the schedule for this decommissioning and expanded the length of time required for completion. The programme is now targeted for closure on 31 March 2026, while defining milestone and legislative timelines through work with partners.","narrativeClaimKind":null},"ratingDelta":-1,"transition":"Improved","endDateDeltaDays":-48,"attentionScore":3,"attentionReasons":["In-year forecast variance is +9.9%"]},{"id":"DFT_0044_2021-Q2","year":2026,"name":"A417 AIR BALLOON","department":"DFT","category":"Infrastructure and Construction","description":"As announced in the Roads Investment Strategy 2, the scope includes improving the A417 with a scheme that includes: - 4 miles of new dual carriageway connecting the existing A417 Brockworth bypass with the existing A417 dual carriageway south of Cowley - a section to the west of the existing Air Balloon roundabout that will follow the existing A417 corridor. However, the section to the south and east of the Air Balloon roundabout will be offline, away from the existing road corridor - a new junction at Shab Hill, providing a link from the A417 to the A436 towards Oxford and into Birdlip - a new junction near Cowley, to replace the existing Cowley Roundabout - the existing A417 between the Air Balloon roundabout and the Cowley Roundabout is being repurposed. We are converting some lengths of this existing road into a route for walkers, cyclists and horse riders, while retaining other sections to maintain local access for residents.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at green. This is primarily due to the following factors that the project is progressing to schedule and on track for Open for Traffic in Quarter 4 Financial Year 26-27.","startDate":"2015-04-01","endDate":"2027-08-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 24/25-Q4 remained at 31/08/2027. This is primarily due to the following factors, that the project remains on schedule.","fyBaseline":137.54,"fyForecast":128.19,"fyVariance":6.8,"varianceNarrative":"The budget variance exceeds 5% of the baseline. This is primarily due to the following factors‚ using our recent forecast from the Business Plan (Dec 2024) the variance is under 5%, but the financial year forecast has been converted to real prices making it slightly exceed 5% variance with the financial year baseline. Please note the HMT baseline (2023) has been superseded by the Business Plan (Dec 2024) as this is the most recent forecast. We didn't draw down on any of the portfolio risk pot within the financial year. Our forecast outturn cost has not changed.","wholeLifeCost":542.63,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) increased from 535 to 542.63. This is primarily due to the following factors that our Whole Life forecast costs have been converted into a different price base (or nominal) if it wasn't for this the costs would have remained unchanged.","benefits":233.06,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) decreased from 424 to 233.06. This is primarily due to the following factors that the figure has been converted into a different price base (or nominal) if it wasn't for this the predicted benefits would have remained unchanged.","themes":["Cost & funding","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at green. This is primarily due to the following factors that the project is progressing to schedule and on track for Open for Traffic in Quarter 4 Financial Year 26-27. Compared to financial year 24/25-Q4, the project's end-date at 24/25-Q4…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end-date at 24/25-Q4 remained at 31/08/2027. This is primarily due to the following factors, that the project remains on schedule.","narrativeClaimKind":null,"history":[{"id":"DFT_0044_2021-Q2","year":2021,"name":"A417 Air Balloon","department":"DFT","category":"Infrastructure and Construction","description":"As announced in the Road Investment Strategy 2 the scope includes: A417 Air Balloon - connecting the two dual carriageway sections of the A417 near Birdlip in Gloucestershire, taking account of both the environmental sensitivity of the site and the importance of the route to the local economy.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber/Green.This is primarily due to the following factors: An IPA Gateway 2 review took place during Q3 FY2020/21, and the delivery confidence rating given was an Amber/Green. The project has implemented all of the recommendations from the review to set the project up for success in order to support the amber/green rating. The project has increased stakeholder engagement and communications in the build up to submission of the Development Consent Order (DCO); has included additional environmental mitigation and enhancements (stepping stones and widening the ecological crossing); has reviewed resourcing and skills requirements and is currently recruiting additional project, commercial and sponsorship resources.","startDate":"2015-04-01","endDate":"2025-06-30","scheduleNarrative":"The project end-date is 30 June 2025. This is primarily due to the following factors: The Highways England Delivery Plan forecasted a project open for traffic date of FY2024/25. The decision was taken to extend the development phase so that a supplementary public consultation could be held to seek views on design changes and refinements to the proposed scheme and to undertake further survey work. The survey's supporting buildability advice highlighted that a more cautious approach for the rest of the schedule and open for traffic date forecast should be adopted. The project is on track to submit DCO in May 2021 and is appointing a Delivery Integrated Partner in mid-2021, to help develop the detailed design and maximise both benefits opportunities and delivery efficiencies during the construction of the scheme. This will bring greater cost and schedule certainty to the project. During this design period the project will be looking for additional opportunities to reduce the construction schedule and to improve the latest open for traffic date forecast of Q2 FY2026/27. The change to the forecast schedule dates has been noted by DfT and HM Treasury.","fyBaseline":17.41,"fyForecast":17.82,"fyVariance":2.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"","themes":["Delivery & schedule","Commercial & supply chain","Scope & requirements","Approvals & decisions"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating is Amber/Green.This is primarily due to the following factors: An IPA Gateway 2 review took place during Q3 FY2020/21, and the delivery confidence rating given was an Amber/Green. The project has implemented all of the recommendations from the review to set the project up for…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project end-date is 30 June 2025. This is primarily due to the following factors: The Highways England Delivery Plan forecasted a project open for traffic date of FY2024/25. The decision was taken to extend the development phase so that a supplementary public consultation could be held to seek views on design changes and refinements to the proposed scheme and to undertake further survey work. The survey's supporting buildability advice highlighted that a more cautious approach for the rest of the schedule and open for traffic date forecast should be adopted. The project is on track to submit DCO in May 2021 and is appointing a Delivery Integrated Partner in mid-2021, to help develop the detailed design and maximise both benefits opportunities and delivery efficiencies during the construction of the scheme. This will bring greater cost and schedule certainty to the project. During this design period the project will be looking for additional opportunities to reduce the construction schedule and to improve the latest open for traffic date forecast of Q2 FY2026/27. The change to the forecast schedule dates has been noted by DfT and HM Treasury.","narrativeClaimKind":null},{"id":"DFT_0044_2021-Q2","year":2022,"name":"A417 Air Balloon","department":"DFT","category":"Infrastructure and Construction","description":"As announced in the Roads Investment Strategy 2, the scope includes: A417 Air Balloon - connecting the two dual carriageway sections of the A417 near Birdlip in Gloucestershire, taking account of both the environmental sensitivity of the site and the importance of the route to the local economy.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 20/21-Q4, the Delivery Confidence Assessment rating at 21/22-Q4 increased from Amber/Green to Amber. In the last year the project has progressed to submission of the Development Consent Order (DCO) application which is due to conclude by November 2022. If approved this will grant the necessary powers to construct the project. Additionally, an agreement has been reached with the lead supplier which is proceeding through governance approvals. Some key project risks and issues include: (1) The project is developing in a period of economic uncertainty which has seen increased levels of inflation. (2) The Secretary of state has extended the consideration of DCO applications on several highways scheme which has increased uncertainty. The project is looking to carry out an IPA Gate 3 in Q3 FY 2022/23. The review will be in preparation for the projects readiness to commence the construction phase of the project. All actions from the previous IPA 2 Gateway have now been closed.","startDate":"2015-04-01","endDate":"2027-04-30","scheduleNarrative":"Compared to 2021-Q4, your project end-date increased from 30 JUN 2025 to 30 APR 2027. This is primarily due to the following factors: As the design of the scheme has developed, further planning around how the construction works will be undertaken has been reviewed and sequenced into the overall schedule. Due to seasonaility constraints to do with ecology, the project is now forecasting an extended time to complete the works on site.","fyBaseline":17.94,"fyForecast":15.74,"fyVariance":-11.0,"varianceNarrative":"There has been a 12% reduction of in year spend due to a delay in onboarding a contractor. This has now been reprofiled to be spent in FY 22/23.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"","themes":["Commercial & supply chain","Delivery & schedule","Cost & funding","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Delivery Confidence Assessment rating at 21/22-Q4 increased from Amber/Green to Amber. In the last year the project has progressed to submission of the Development Consent Order (DCO) application which is due to conclude by November 2022. If approved this will grant the necessary powers to construct the project.…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to 2021-Q4, your project end-date increased from 30 JUN 2025 to 30 APR 2027. This is primarily due to the following factors: As the design of the scheme has developed, further planning around how the construction works will be undertaken has been reviewed and sequenced into the overall schedule. Due to seasonaility constraints to do with ecology, the project is now forecasting an extended time to complete the works on site.","narrativeClaimKind":null},{"id":"DFT_0044_2021-Q2","year":2023,"name":"A417 Air Balloon","department":"DFT","category":"Infrastructure and Construction","description":"As announced in the Roads Investment Strategy 2, the scope includes: A417 Air Balloon - connecting the two dual carriageway sections of the A417 near Birdlip in Gloucestershire, taking account of both the environmental sensitivity of the site and the importance of the route to the local economy.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 21/22-Q4, Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 increased from Amber to Green. This is primarily due to the following factors. An Independent Assurance Review (IAR) 3B was undertaken in October 2022 with a Green outcome. Project received 5 recommendations of which 2 were recommendations and 3 were essential. An action plan was put in place and all recommendations have been completed","startDate":"2015-04-01","endDate":"2027-08-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 increased from 2027-04-30 to 2027-08-31. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 increased from 2027-04-30 to 2027-08-31. This is primarily due to the following factors. Start of Works (SoW) was achieved on 17 February 2023, one month ahead of the DfT approved forecasted date, and seven months ahead of National Highways Delivery Plan commitment date. Project is still on target to achieve commitment dates","fyBaseline":33.4,"fyForecast":30.5,"fyVariance":-9.0,"varianceNarrative":"The baseline for 22/23 was set in the 21/22 FY, prior to appointment of the Delivery Integrated Partner at a point where the preliminary design was still being improved. As the project mobilised the Regional Delivery Partnership contract, we acquired more certainty over work packages through the year. National Highways also changed the supplier for its project controls function (the contract) and the contractual rates differed from the assumptions made when the baseline was set.","wholeLifeCost":482.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 22/23-Q4 is 482m. This is primarily due to the following factors. The project is forecasting within the approved budget","benefits":424.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 424m. The benefits have been reprofiled in line with the latest economic appraisal (Business Case). The benefits have dropped by 92m (Present Value Benefits) since updated Outline Business Case (Approved in 2021) due to changes in transport appraisal guidance and methodology updates. There has been no material change to the project scope.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 increased from Amber to Green. This is primarily due to the following factors. An Independent Assurance Review (IAR) 3B was undertaken in October 2022 with a Green outcome. Project received 5 recommendations of which 2 were recommendations and 3…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 increased from 2027-04-30 to 2027-08-31. This is primarily due to the following factors. Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 increased from 2027-04-30 to 2027-08-31. This is primarily due to the following factors. Start of Works (SoW) was achieved on 17 February 2023, one month ahead of the DfT approved forecasted date, and seven months ahead of National Highways Delivery Plan commitment date. Project is still on target to achieve commitment dates","narrativeClaimKind":null},{"id":"DFT_0044_2021-Q2","year":2024,"name":"A417 Air Balloon","department":"DFT","category":"Infrastructure and Construction","description":"As announced in the Roads Investment Strategy 2, the scope includes: A417 Air Balloon- connecting the two dual carriageway sections of the A417 near Birdlip in Gloucestershire, taking account of both the environmental sensitivity of the site and the importance of the route to local economy.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Green. This is primarily due to the following factors. An Independent Assurance Review (IAR) 3B was undertaken in October 2022 with a Green Outcome. Project received 5 recommendations of which 2 were recommendations and 3 were essential. An action plan was put in place and all recommendations have been completed.","startDate":"2015-04-01","endDate":"2027-08-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2027-08-31. This is primarily due to the following factors. Start of Works (SoW) was achieved on 17 February 2023, one month ahead of the Department for Transport approved forecast date, and seven months ahead of National Highways Delivery Plan committed date. Project is still on target to achieve commitment dates. The Notice to proceed was issued to National Highways delivery partner on 28 December 2023, to commence the next phase of the construction works.","fyBaseline":80.6,"fyForecast":47.07,"fyVariance":-42.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The project has re-phased the construction programme, there is no change to the outturn cost.","wholeLifeCost":535.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 increased from 482m. to 535m. This is primarily due to the following factors. The increase is due to cost inflation being higher than anticipated when the previous estimate was set.","benefits":424.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 424m. There has been no change.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 remained at Green. This is primarily due to the following factors. An Independent Assurance Review (IAR) 3B was undertaken in October 2022 with a Green Outcome. Project received 5 recommendations of which 2 were recommendations and 3 were…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2027-08-31. This is primarily due to the following factors. Start of Works (SoW) was achieved on 17 February 2023, one month ahead of the Department for Transport approved forecast date, and seven months ahead of National Highways Delivery Plan committed date. Project is still on target to achieve commitment dates. The Notice to proceed was issued to National Highways delivery partner on 28 December 2023, to commence the next phase of the construction works.","narrativeClaimKind":null},{"id":"DFT_0044_2021-Q2","year":2025,"name":"A417 AIR BALLOON","department":"DfT","category":"Infrastructure and Construction","description":"As announced in the Roads Investment Strategy 2, the scope includes improving the A417 with a scheme that includes: - 4 miles of new dual carriageway connecting the existing A417 Brockworth bypass with the existing A417 dual carriageway south of Cowley - a section to the west of the existing Air Balloon roundabout that will follow the existing A417 corridor. However, the section to the south and east of the Air Balloon roundabout will be offline, away from the existing road corridor - a new junction at Shab Hill, providing a link from the A417 to the A436 towards Oxford and into Birdlip - a new junction near Cowley, to replace the existing Cowley Roundabout - the existing A417 between the Air Balloon roundabout and the Cowley Roundabout is being repurposed. We are converting some lengths of this existing road into a route for walkers, cyclists and horse riders, while retaining other sections to maintain local access for residents.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at GREEN. This is primarily due to the following factors‚ The project is still forecasting to deliver on budget and OfT remains as Spring 2027.","startDate":"2015-04-01","endDate":"2027-08-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/08/2027. This is primarily due to the following factors‚ The project remains on schedule.","fyBaseline":161.6,"fyForecast":128.31,"fyVariance":20.6,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The In-year Spend vs Forecast variance within the annual report exceeds 5% as the forecast used is the HMT baseline (2023) not the updated baseline following the fitness for pricing exercise March 2024, for which the variance is within 5%. We didn't draw down on any of the portfolio risk pot within the financial year. Our forecast outturn cost has not changed.","wholeLifeCost":535.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 535. This is primarily due to the following factors‚ Our forecast costs have remained unchanged.","benefits":424.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 424. This is primarily due to the following factors‚ Our predicted benefits have not changed.","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at GREEN. This is primarily due to the following factors‚ The project is still forecasting to deliver on budget and OfT remains as Spring 2027. Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/08/2027. This is primarily due to the following factors‚ The project remains on schedule.","narrativeClaimKind":null},{"id":"DFT_0044_2021-Q2","year":2026,"name":"A417 AIR BALLOON","department":"DFT","category":"Infrastructure and Construction","description":"As announced in the Roads Investment Strategy 2, the scope includes improving the A417 with a scheme that includes: - 4 miles of new dual carriageway connecting the existing A417 Brockworth bypass with the existing A417 dual carriageway south of Cowley - a section to the west of the existing Air Balloon roundabout that will follow the existing A417 corridor. However, the section to the south and east of the Air Balloon roundabout will be offline, away from the existing road corridor - a new junction at Shab Hill, providing a link from the A417 to the A436 towards Oxford and into Birdlip - a new junction near Cowley, to replace the existing Cowley Roundabout - the existing A417 between the Air Balloon roundabout and the Cowley Roundabout is being repurposed. We are converting some lengths of this existing road into a route for walkers, cyclists and horse riders, while retaining other sections to maintain local access for residents.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at green. This is primarily due to the following factors that the project is progressing to schedule and on track for Open for Traffic in Quarter 4 Financial Year 26-27.","startDate":"2015-04-01","endDate":"2027-08-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 24/25-Q4 remained at 31/08/2027. This is primarily due to the following factors, that the project remains on schedule.","fyBaseline":137.54,"fyForecast":128.19,"fyVariance":6.8,"varianceNarrative":"The budget variance exceeds 5% of the baseline. This is primarily due to the following factors‚ using our recent forecast from the Business Plan (Dec 2024) the variance is under 5%, but the financial year forecast has been converted to real prices making it slightly exceed 5% variance with the financial year baseline. Please note the HMT baseline (2023) has been superseded by the Business Plan (Dec 2024) as this is the most recent forecast. We didn't draw down on any of the portfolio risk pot within the financial year. Our forecast outturn cost has not changed.","wholeLifeCost":542.63,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) increased from 535 to 542.63. This is primarily due to the following factors that our Whole Life forecast costs have been converted into a different price base (or nominal) if it wasn't for this the costs would have remained unchanged.","benefits":233.06,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) decreased from 424 to 233.06. This is primarily due to the following factors that the figure has been converted into a different price base (or nominal) if it wasn't for this the predicted benefits would have remained unchanged.","themes":["Cost & funding","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at green. This is primarily due to the following factors that the project is progressing to schedule and on track for Open for Traffic in Quarter 4 Financial Year 26-27. Compared to financial year 24/25-Q4, the project's end-date at 24/25-Q4…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end-date at 24/25-Q4 remained at 31/08/2027. This is primarily due to the following factors, that the project remains on schedule.","narrativeClaimKind":null}],"previous":{"id":"DFT_0044_2021-Q2","year":2025,"name":"A417 AIR BALLOON","department":"DfT","category":"Infrastructure and Construction","description":"As announced in the Roads Investment Strategy 2, the scope includes improving the A417 with a scheme that includes: - 4 miles of new dual carriageway connecting the existing A417 Brockworth bypass with the existing A417 dual carriageway south of Cowley - a section to the west of the existing Air Balloon roundabout that will follow the existing A417 corridor. However, the section to the south and east of the Air Balloon roundabout will be offline, away from the existing road corridor - a new junction at Shab Hill, providing a link from the A417 to the A436 towards Oxford and into Birdlip - a new junction near Cowley, to replace the existing Cowley Roundabout - the existing A417 between the Air Balloon roundabout and the Cowley Roundabout is being repurposed. We are converting some lengths of this existing road into a route for walkers, cyclists and horse riders, while retaining other sections to maintain local access for residents.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at GREEN. This is primarily due to the following factors‚ The project is still forecasting to deliver on budget and OfT remains as Spring 2027.","startDate":"2015-04-01","endDate":"2027-08-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/08/2027. This is primarily due to the following factors‚ The project remains on schedule.","fyBaseline":161.6,"fyForecast":128.31,"fyVariance":20.6,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The In-year Spend vs Forecast variance within the annual report exceeds 5% as the forecast used is the HMT baseline (2023) not the updated baseline following the fitness for pricing exercise March 2024, for which the variance is within 5%. We didn't draw down on any of the portfolio risk pot within the financial year. Our forecast outturn cost has not changed.","wholeLifeCost":535.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 535. This is primarily due to the following factors‚ Our forecast costs have remained unchanged.","benefits":424.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 424. This is primarily due to the following factors‚ Our predicted benefits have not changed.","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at GREEN. This is primarily due to the following factors‚ The project is still forecasting to deliver on budget and OfT remains as Spring 2027. Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/08/2027. This is primarily due to the following factors‚ The project remains on schedule.","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":0,"attentionScore":2,"attentionReasons":["In-year forecast variance is +6.8%"]},{"id":"HMRC_0015_1617-Q1","year":2026,"name":"BUILDING OUR FUTURE LOCATIONS PROGRAMME","department":"HMRC","category":"Government Transformation and Service Delivery","description":"HMRC’s locations strategy, announced in 2015, is key to enabling a modern tax and customs administration. The programme transforms HMRC’s estate to enable the organisation to operate from strategically important locations that support both government’s priorities and HMRC’s delivery. Our people will work in large, modern regional centres, regional offices and a London Headquarters from which we can better deliver our services. Our long-term offices are being sited in locations where HMRC can recruit, retain and develop a talented workforce, equipped with the digital infrastructure and flexible workspace needed to support and motivate our people.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The programme’s Delivery Confidence Assessment improved from Amber to Green following a National Infrastructure and Service Transformation Authority (NISTA) review in July 2025. This reflects strong confidence in the programme’s governance, capability and delivery approach. In April 2026, the programme moved from NISTA GMPP reporting to Major Project status, with assurance now led by HMRC. The programme continues to secure and deliver long‑term locations that retain critical skills, minimise redundancies and rehire costs, and provide best value for money—supporting HMRC’s long‑term workforce sustainability and operational effectiveness.","startDate":"2016-01-05","endDate":"2031-04-05","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same - 05/04/2031. Whilst the current assumption remains that the Locations Programme will close in 2030/31, the programme continues to undertake rigorous planning to ensure a smooth, well‑coordinated programme closure that protects delivery confidence and organisational readiness.","fyBaseline":201.79,"fyForecast":212.5,"fyVariance":5.31,"varianceNarrative":"The 2025/26 full year final position is £10m higher than the departmental forecast reported at Q3 driven by recognising opportunities to accelerate areas of the programme which de-risks delivery timelines.","wholeLifeCost":2831.53,"costNarrative":"The programme was originally planned to complete within 10 years but is now expected to run for 15 years. In 2018/19, the business case was updated and the Whole Life Costs (WLC) were extended to a 25-year period, in line with industry standards. This approach has been used consistently in all subsequent business cases. As a result of the longer programme duration, the discounted HM Treasury WLC increased, but it remains within the overall WLC envelope set out in the original programme.","benefits":143.88,"benefitsNarrative":"The programme's Benefits at 25/26-Q4 remain in line with the departmental baseline. Monetised benefits represent estate running cost savings as a result of exiting legacy estate and moving into new offices.","themes":["Delivery & schedule","Governance & assurance","Workforce & capability","Cost & funding"],"evidenceExcerpt":"The programme’s Delivery Confidence Assessment improved from Amber to Green following a National Infrastructure and Service Transformation Authority (NISTA) review in July 2025. This reflects strong confidence in the programme’s governance, capability and delivery approach. In April 2026, the programme moved from NISTA GMPP reporting to Major Project…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same - 05/04/2031. Whilst the current assumption remains that the Locations Programme will close in 2030/31, the programme continues to undertake rigorous planning to ensure a smooth, well‑coordinated programme closure that protects delivery confidence and organisational readiness.","narrativeClaimKind":null,"history":[{"id":"HMRC_0015_1617-Q1","year":2020,"name":"Building Our Future Locations Programme","department":"HMRC","category":"Government Transformation and Service Delivery","description":"HMRC will be a transformed organisation operating from 13 large, modern Regional Centres (RCs), 5 Specialist Sites and a London Headquarters equipped with the digital infrastructure and training facilities needed to support and motivate our people, and from which we can better serve our customers as an effective, efficient and impartial tax and payments authority.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber/Green, which has improved since last year�s Q2 1819 Amber, due primarily to the following factors; - The signing of Regional Centre leases for all locations except Newcastle, and the commercial agreement of all fit-out and FM contracts, provided a firm baseline for the Programme with practical evidence of successful delivery in Bristol, Croydon & Canary Wharf shaping future transitions by demonstrating that learning had been taken on-board from these deliveries, the transition of staff and early legacy site closures. - The 'Bounding' or confining of the financial risk, establishing a firm view on delivery cost and a more realistic assessment of the cashable benefits, managing well within budgets set out in the latest version of the business case with a good balance between financial risks and opportunities. This is strengthened further by the signing of the STEPS PFI exit deal in March 2020. - A high quality of Programme Leadership and team, with a key focus on staff and supporting them through the transition. Very strong evidence of staff engagement and the requirement to balance both the needs of staff and the business. Robust risk management in place. Since the Q2 1920 (30th September 2019) Amber/Green IPA DCA, the following non-project operating environment activities have impacted the original Q2 IPA DCA; - Increases in predicted HMRC staffing levels, mainly through EU Transition work. - Covid-19 is having an increasingly major effect on the programme.� A 'Planning for Delay' process is being used to assess individual project delivery risk; A Programme Response Plan has been produced to support national priorities; Programme is working with contractors to assess their delivery capacity and constraints against a fast developing situation. The places most affected are Birmingham, Liverpool and Stratford whose delivery schedules were the tightest beforehand. Since the Q2 1920 (30th September 2019) Amber/Green IPA DCA, the following primary project actions have impacted the original Q2 IPA DCA; - Further to the opening of the Bristol RC, Belfast, Erskine House was opened in January 2020, with our new acquisition transitional site in Glasgow following in March 2020, and the Edinburgh RC being well set for delivery in early 2020/21. - Difficulties with the Liverpool RC delivery reaching resolution, with contracts now moving to signing between landlord and new contractor to progress India Buildings to a refreshed schedule; resulting in movement of costs and some legacy estate challenges. The Birmingham project is delayed due to a CAT A (ceiling, lighting, heating, flooring etc.) build overrun. Options to mitigate are in progress to minimise disruption to people and business. Current contractor has increased resources for internal and external works to minimise the �Ready For Service� delay. - Work is underway to consolidate estate changes made necessary since our programme baseline was agreed by way of a re-iteration to the programme business case.","startDate":"2016-01-05","endDate":"2026-03-31","scheduleNarrative":"The scheduled baseline project end date at Q2 1920 (30th September 2019) is 31/03/26, has not changed since last year's Q2 1819 date of 31/03/26, due primarily to the following factors; - The date is in relation to the Locations Programme closure which has and continues to remain consistent at 31/03/2026. Since the Q2 1920 (30th September 2019) baseline project end date of 31/03/26, the following non-project operating environment activities have impacted the original Q2 baseline project end date; - The baseline programme closure end date remains at 31/03/2026. The impacts of Covid 19 at project level are currently being reviewed via a contingency planning exercise but, at this stage, are not expected to put the programme closure date at risk. Since the Q2 1920 (30th September 2019) baseline project end date of 31/03/26, the following primary project actions have impacted the original Q2 baseline project end date; - The current impacts on Locations Programme individual projects are not known to effect the programme end date of 31/03/2026.","fyBaseline":387.7,"fyForecast":348.3,"fyVariance":-10.0,"varianceNarrative":"The 19/20 in-year baseline / forecast variance at Q2 1920 (30th September 2019) of -10%, is due primarily to the following factors; - HMRC reprioritisation exercises, post the calculation of the programme baseline, result in decisions to delay the Newcastle and Nottingham Regional Centre Projects to later years","wholeLifeCost":2835.9,"costNarrative":"The baseline Whole Life Cost at Q2 1920 (30th September 2019) is �2,835.90 m, has not changed since last year's Q2 1819 (�m) baseline Whole Life Cost of �2,835.90 m, due primarily to the following factors; - The programme baseline has not been formally updated since the Programme business Case v1, approved by HMT in April 2017.","benefits":null,"benefitsNarrative":"","themes":["Delivery & schedule","Cost & funding","Workforce & capability","Approvals & decisions"],"evidenceExcerpt":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber/Green, which has improved since last year�s Q2 1819 Amber, due primarily to the following factors; - The signing of Regional Centre leases for all locations except Newcastle, and the commercial agreement of all fit-out and FM contracts, provided a firm baseline…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2020","sourceLabel":"IPA Annual Report 2019-20","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The scheduled baseline project end date at Q2 1920 (30th September 2019) is 31/03/26, has not changed since last year's Q2 1819 date of 31/03/26, due primarily to the following factors; - The date is in relation to the Locations Programme closure which has and continues to remain consistent at 31/03/2026. Since the Q2 1920 (30th September 2019) baseline project end date of 31/03/26, the following non-project operating environment activities have impacted the original Q2 baseline project end date; - The baseline programme closure end date remains at 31/03/2026. The impacts of Covid 19 at project level are currently being reviewed via a contingency planning exercise but, at this stage, are not expected to put the programme closure date at risk. Since the Q2 1920 (30th September 2019) baseline project end date of 31/03/26, the following primary project actions have impacted the original Q2 baseline project end date; - The current impacts on Locations Programme individual projects are not known to effect the programme end date of 31/03/2026.","narrativeClaimKind":null},{"id":"HMRC_0015_1617-Q1","year":2021,"name":"Building Our Future Locations Programme","department":"HMRC","category":"Government Transformation and Service Delivery","description":"HMRC's transformation is the biggest modernisation of the UK tax system making changes to the way the department works and the services it provides. Our Locations Programme is a key enabler and by changing people's working environment, HMRC is helping to change how they work. We are creating a new network of modern digital hubs in 13 regions, alongside 5 Specialist Sites and a London HQ. Our Regional Centres will be inclusive and environmentally friendly places to work. Technologically advanced, they will be available not just to HMRC colleagues but also to other government departments, truly anchoring the locations as the first in the network of wider government hubs and bringing to life the vision for the Civil Service of the future.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating increased from Amber/Green to Amber. This is primarily due to the following factors: In addition to the Edinburgh Regional Centre opened earlier this year, the Programme has successfully delivered a further 3 new Regional Centres during this quarter in Cardiff, Leeds and Stratford. We have now delivered 7 of the 13 HMRC Regional Centres, as well as a Hub at Canary Wharf. The Programme is on track to deliver a further 5 Regional Centres in the upcoming financial year. We continue to secure benefits, in accordance with the latest Programme Business Case, through the closure of our legacy estate. Over the last financial year, we have closed 40 legacy offices and a total of 124 offices since the Programme began.","startDate":"2016-01-05","endDate":"2026-03-31","scheduleNarrative":"Compared to financial year 19/20-Q2, the project's end-date remained scheduled to finish on 31 March 2026 . This is primarily due to the following factors: The Programme remains on target to complete on 31st March 2026","fyBaseline":405.8,"fyForecast":456.47,"fyVariance":12.0,"varianceNarrative":"The budget variance exceeds 5%. The 2020/21 full year final position at Q4 is 12% higher than baseline, this is primarily because of the following factors: - HMRC re-prioritisation of its programme portfolio resulting in deferral of expenditure into 2021/2022 - Civil Service Compensation Scheme terms not changing as originally expected resulting in exits remaining more expensive","wholeLifeCost":2835.9,"costNarrative":"Compared to financial year 19/20-Q2, the projects Baseline Whole Life Cost remained at �2835.90m. This is primarily due to the following factors: The baseline Whole Life Cost as at Q4 202/21 is unchanged from �2,835.90m reported in the 2019/20 report. It has not been formally updated since the Programme Business Case v1.0 was approved by HMT in May 2017.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Approvals & decisions","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating increased from Amber/Green to Amber. This is primarily due to the following factors: In addition to the Edinburgh Regional Centre opened earlier this year, the Programme has successfully delivered a further 3 new Regional Centres during this…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 19/20-Q2, the project's end-date remained scheduled to finish on 31 March 2026 . This is primarily due to the following factors: The Programme remains on target to complete on 31st March 2026","narrativeClaimKind":null},{"id":"HMRC_0015_1617-Q1","year":2022,"name":"Building Our Future Locations Programme","department":"HMRC","category":"Government Transformation and Service Delivery","description":"HMRC's Locations Strategy, announced in 2015, is key to enabling its wider transformation. The Locations Strategy is delivering the Phase One Government Hubs and supports the Government's Places for Growth Programme by creating opportunities and career paths in towns and cities across the UK. Going forward HMRC will be operating from a network of large modern regional centres and specialist sites and a Head Office in Westminster. Our new buildings are environmentally efficient and provide flexible, fully inclusive workspaces supporting smarter working and meeting future changing demands and priorities of use.","ipaDca":"Green","sroDca":null,"deliveryConfidence":"Green","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 decreased from Amber to Green The Programme has successfully delivered 9 Regional Centres, alongside a hub at Canary Wharf. During Financial Year 2021/22, Regional Centres were delivered in Liverpool and Birmingham, and the Programme is on track to deliver a further 3 during Q1 of 2022/23. Following approval from the Chief Secretary to the Treasury (CST), the Programme announced that Portsmouth will become our 14th Regional Centre and East Kilbride will be the location for the second phase of Glasgow Regional Centre. The agreement for lease for the Newcastle Regional Centre was signed in November 2021.","startDate":"2016-01-05","endDate":"2026-03-31","scheduleNarrative":"Compared to 2021-Q4, your project end-date remained scheduled to finish on 31 MAR 2026 . This is primarily due to the following factors: The Programme remains on target to complete on 31st March 2026","fyBaseline":231.7,"fyForecast":270.05,"fyVariance":16.0,"varianceNarrative":"The budget variance exceeds 5%. The 2021/22 full year final position at Q4 is 16% higher than baseline, this is primarily because of the following factors: HMRC re-prioritisation of its programme Portfolio resulting in deferral of expenditure for several projects into 2021/2022 Civil Service Compensation Scheme terms not changing as originally expected resulting in exits remaining more expensive","wholeLifeCost":2836.0,"costNarrative":"Compared to 2021-Q4,the projects Baseline Whole Life Cost remained at 2835.90 (£m). This is primarily due to the following factors: The baseline Whole Life Cost as at Q4 2021/22 is unchanged from £2,835.90m reported in the 2020/21 report. It has not been formally updated since the Programme Business Case v1.0 was approved by HMT in April 2017.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Approvals & decisions","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 21/22-Q4 decreased from Amber to Green The Programme has successfully delivered 9 Regional Centres, alongside a hub at Canary Wharf. During Financial Year 2021/22, Regional Centres were delivered in Liverpool and Birmingham, and the Programme…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to 2021-Q4, your project end-date remained scheduled to finish on 31 MAR 2026 . This is primarily due to the following factors: The Programme remains on target to complete on 31st March 2026","narrativeClaimKind":null},{"id":"HMRC_0015_1617-Q1","year":2023,"name":"Building Our Future Locations Programme","department":"HMRC","category":"Government Transformation and Service Delivery","description":"HMRC's Locations Strategy, announced in 2015, is key to enabling its wider transformation. The Locations Strategy is delivering the Phase One Government Hubs and supports the Governments Places for Growth Programme by creating opportunities and career paths in towns and cities across the UK. HMRC's new estate provides safe, modern and inclusive workspaces with high-speed digital infrastructure enabling improved collaboration, smarter working and enabling a culture where everyone feels valued. These incorporate flexible layouts that will meet future changing demands and priorities.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 remained at Green (SRO rating). This is primarily due to the following factors. The Programme has now successfully delivered 12 regional centres and 2 Specialist Sites, with 11 of these being awarded Inclusive Environments Recognition by the Construction Industry Council (CIC). During Financial Year 2022/23, the Locations Programme successfully opened a further 3 regional centres in Nottingham, Glasgow and Manchester, enabling over 10k HMRC staff to move into those new offices within the planned timescales. Following the lifting of lock down restrictions, we were also finally able to hold the opening ceremonies for 10 of our new regional centres. Ourremaining projects are at a stage where we are still considering options and Outline Business Cases will be produced from Q1 23/24 onwards.","startDate":"2016-01-05","endDate":"2026-03-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2026-03-31. This is primarily due to the following factors. The current assumption is that the programme end date will be 2028/29, to allow the safe delivery of our remaining deliveries and to the conclude our work on Phase 1 of the Government Hubs.","fyBaseline":221.2,"fyForecast":232.79,"fyVariance":5.0,"varianceNarrative":"The budget variance exceeds 5%. 2022/23 full year final position at end of Q4 is 32% lower than baseline. This is primarily due to the baseline position included 9.6m for Moves Assistance Payments (MAP, formerly Daily Travel Allowance) which the programme no longer funds, and revised delivery timelines in several projects, and a move to Hybrid working which greatly reduces the cost to HMRC.","wholeLifeCost":2836.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 remained at 2836m. This is primarily due to the following factors. The baseline Whole Life Cost as at Q4 2022/23 is unchanged from 2,836m reported in the 2021/22 report. It has not been formally updated since the Programme Business Case v1.0 was approved by HMT in April 2017.","benefits":74.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 74m. The project's departmentally-agreed monetised benefits at 22/23-Q4 is 74m. This is due to: Monetised benefits represent estate running cost savings as a result of exiting legacy estate and moving into new Regional Centres and Specialist sites.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 remained at Green (SRO rating). This is primarily due to the following factors. The Programme has now successfully delivered 12 regional centres and 2 Specialist Sites, with 11 of these being awarded Inclusive Environments Recognition by the Construction Industry…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2026-03-31. This is primarily due to the following factors. The current assumption is that the programme end date will be 2028/29, to allow the safe delivery of our remaining deliveries and to the conclude our work on Phase 1 of the Government Hubs.","narrativeClaimKind":null},{"id":"HMRC_0015_1617-Q1","year":2024,"name":"Building Our Future Locations Programme","department":"HMRC","category":"Government Transformation and Service Delivery","description":"HMRC's locations strategy, announced in 2015, is key to enabling a more highly skilled tax and customs authority within a Modern Civil Service. It continues to deliver modern, inclusive and strategically located offices, supporting the Government's Places for Growth Programme by creating opportunities, career paths and enabling vibrant cross government professional communities and in towns and cities across the UK._x000D_ _x000D_ HMRC's new, award winning, offices provide safe, modern and inclusive workspaces with the digital infrastructure enabling improved collaboration, smarter working and a culture where everyone feels valued. HMRC's offices incorporate flexible layouts that will meet future changing demands and priorities.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 22/23-Q4, Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 increased from Green to Amber. This is primarily due to the following factors. The programme successfully completed the first phase of its delivery of Phase One of Government Hubs. It has opened 12 award winning, greener offices enabling smarter working and accommodating 48 government departments. We are continuing to secure long term locations to ensure HMRC retains the required skills, in the right locations while minimising redundancies, loss of knowledge and cost of rehire._x000D_ _x000D_ In 2023/24, we obtained approval and progressed our solutions for Portsmouth, Telford and Dover. Ourremaining projects are at astage where we are still considering options andOutline Business Cases will be produced during the next financial year.","startDate":"2016-01-05","endDate":"2031-04-05","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 increased from 2026-03-31 to 2031-04-05. This is primarily due to the following factors. We are continuing to secure long term locations for HMRC. Taking this into consideration, the current assumption is that the Programme will close in 2030/31.","fyBaseline":225.2,"fyForecast":232.95,"fyVariance":3.0,"varianceNarrative":"The budget variance is inferior or equal to 5%.","wholeLifeCost":2836.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 remained at 2836m. This is primarily due to the following factors. Whilst there have been in-year costs variances, the overall cost of the programme remains unchanged.","benefits":74.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 74m. Monetised benefits represent estate running cost savings as a result of exiting legacy estate and moving into new Regional Centres and Specialist sites.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 increased from Green to Amber. This is primarily due to the following factors. The programme successfully completed the first phase of its delivery of Phase One of Government Hubs. It has opened 12 award winning, greener offices enabling smarter…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 increased from 2026-03-31 to 2031-04-05. This is primarily due to the following factors. We are continuing to secure long term locations for HMRC. Taking this into consideration, the current assumption is that the Programme will close in 2030/31.","narrativeClaimKind":null},{"id":"HMRC_0015_1617-Q1","year":2025,"name":"BUILDING OUR FUTURE LOCATIONS PROGRAMME","department":"HMRC","category":"Government Transformation and Service Delivery","description":"HMRC’s locations strategy, announced in 2015, is key to enabling a more highly skilled tax and customs authority within a Modern Civil Service. It continues to deliver modern, inclusive and strategically located offices, supporting wider government by creating opportunities, career paths and enabling vibrant cross government professional communities and in towns and cities across the UK. HMRC’s new, award winning, offices provide safe, modern and inclusive workspaces with the digital infrastructure enabling improved collaboration, smarter working and a culture where everyone feels valued. HMRC’s offices incorporate flexible layouts that will meet future changing demands and priorities.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The programme has successfully delivered 12 award winning, greener offices enabling smarter working and accommodating over 40 government departments. We are continuing to secure long term locations to ensure HMRC retains the required skills, in the right locations while minimising redundancies, loss of knowledge and cost of rehire. In 2024/25, we successfully completed the refurbishment of our Dover Specialist Site. The construction of the Newcastle Regional Centre is progressing as planned and we are entering the delivery phase for our Portsmouth and Telford offices. For our remaining sites, we have scheduled the delivery of the Outline Business Cases to enable us identify solutions that offer the best value for money and ensure HMRC retains the required skills in the right locations.","startDate":"2016-01-05","endDate":"2031-04-05","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 05/04/2031. This is primarily due to the following factors‚ We are continuing to secure long term locations for HMRC. Taking this into consideration, the current assumption remains that the Programme will close in 2030/31.","fyBaseline":201.64,"fyForecast":196.48,"fyVariance":2.56,"varianceNarrative":"The budget variance is less than or equal to 5%. The 2024/25 full year final position was c.£2m lower than the departmental forecast reported at Q3. This is primarily due to in-year reductions driven by revised delivery timelines in several projects where costs will be incurred at a future point.","wholeLifeCost":2884.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 2836 to 2884. This is primarily due to the following factors‚ Programme delivery was expected to conclude within a 10 year timeframe whereas the current programme is for 15 years. Given the extended life of the programme, discounted HMT WLC cost have increased but are still within the original programme WLC.","benefits":107.3,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 74 to 107. This is primarily due to the following factors‚ Monetised benefits represent estate running cost savings as a result of exiting legacy estate and moving into new Regional Centres and Specialist sites.","themes":["Cost & funding","Delivery & schedule","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The programme has successfully delivered 12 award winning, greener offices enabling smarter working and accommodating over 40 government departments. We are…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 05/04/2031. This is primarily due to the following factors‚ We are continuing to secure long term locations for HMRC. Taking this into consideration, the current assumption remains that the Programme will close in 2030/31.","narrativeClaimKind":null},{"id":"HMRC_0015_1617-Q1","year":2026,"name":"BUILDING OUR FUTURE LOCATIONS PROGRAMME","department":"HMRC","category":"Government Transformation and Service Delivery","description":"HMRC’s locations strategy, announced in 2015, is key to enabling a modern tax and customs administration. The programme transforms HMRC’s estate to enable the organisation to operate from strategically important locations that support both government’s priorities and HMRC’s delivery. Our people will work in large, modern regional centres, regional offices and a London Headquarters from which we can better deliver our services. Our long-term offices are being sited in locations where HMRC can recruit, retain and develop a talented workforce, equipped with the digital infrastructure and flexible workspace needed to support and motivate our people.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The programme’s Delivery Confidence Assessment improved from Amber to Green following a National Infrastructure and Service Transformation Authority (NISTA) review in July 2025. This reflects strong confidence in the programme’s governance, capability and delivery approach. In April 2026, the programme moved from NISTA GMPP reporting to Major Project status, with assurance now led by HMRC. The programme continues to secure and deliver long‑term locations that retain critical skills, minimise redundancies and rehire costs, and provide best value for money—supporting HMRC’s long‑term workforce sustainability and operational effectiveness.","startDate":"2016-01-05","endDate":"2031-04-05","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same - 05/04/2031. Whilst the current assumption remains that the Locations Programme will close in 2030/31, the programme continues to undertake rigorous planning to ensure a smooth, well‑coordinated programme closure that protects delivery confidence and organisational readiness.","fyBaseline":201.79,"fyForecast":212.5,"fyVariance":5.31,"varianceNarrative":"The 2025/26 full year final position is £10m higher than the departmental forecast reported at Q3 driven by recognising opportunities to accelerate areas of the programme which de-risks delivery timelines.","wholeLifeCost":2831.53,"costNarrative":"The programme was originally planned to complete within 10 years but is now expected to run for 15 years. In 2018/19, the business case was updated and the Whole Life Costs (WLC) were extended to a 25-year period, in line with industry standards. This approach has been used consistently in all subsequent business cases. As a result of the longer programme duration, the discounted HM Treasury WLC increased, but it remains within the overall WLC envelope set out in the original programme.","benefits":143.88,"benefitsNarrative":"The programme's Benefits at 25/26-Q4 remain in line with the departmental baseline. Monetised benefits represent estate running cost savings as a result of exiting legacy estate and moving into new offices.","themes":["Delivery & schedule","Governance & assurance","Workforce & capability","Cost & funding"],"evidenceExcerpt":"The programme’s Delivery Confidence Assessment improved from Amber to Green following a National Infrastructure and Service Transformation Authority (NISTA) review in July 2025. This reflects strong confidence in the programme’s governance, capability and delivery approach. In April 2026, the programme moved from NISTA GMPP reporting to Major Project…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 remained the same - 05/04/2031. Whilst the current assumption remains that the Locations Programme will close in 2030/31, the programme continues to undertake rigorous planning to ensure a smooth, well‑coordinated programme closure that protects delivery confidence and organisational readiness.","narrativeClaimKind":null}],"previous":{"id":"HMRC_0015_1617-Q1","year":2025,"name":"BUILDING OUR FUTURE LOCATIONS PROGRAMME","department":"HMRC","category":"Government Transformation and Service Delivery","description":"HMRC’s locations strategy, announced in 2015, is key to enabling a more highly skilled tax and customs authority within a Modern Civil Service. It continues to deliver modern, inclusive and strategically located offices, supporting wider government by creating opportunities, career paths and enabling vibrant cross government professional communities and in towns and cities across the UK. HMRC’s new, award winning, offices provide safe, modern and inclusive workspaces with the digital infrastructure enabling improved collaboration, smarter working and a culture where everyone feels valued. HMRC’s offices incorporate flexible layouts that will meet future changing demands and priorities.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The programme has successfully delivered 12 award winning, greener offices enabling smarter working and accommodating over 40 government departments. We are continuing to secure long term locations to ensure HMRC retains the required skills, in the right locations while minimising redundancies, loss of knowledge and cost of rehire. In 2024/25, we successfully completed the refurbishment of our Dover Specialist Site. The construction of the Newcastle Regional Centre is progressing as planned and we are entering the delivery phase for our Portsmouth and Telford offices. For our remaining sites, we have scheduled the delivery of the Outline Business Cases to enable us identify solutions that offer the best value for money and ensure HMRC retains the required skills in the right locations.","startDate":"2016-01-05","endDate":"2031-04-05","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 05/04/2031. This is primarily due to the following factors‚ We are continuing to secure long term locations for HMRC. Taking this into consideration, the current assumption remains that the Programme will close in 2030/31.","fyBaseline":201.64,"fyForecast":196.48,"fyVariance":2.56,"varianceNarrative":"The budget variance is less than or equal to 5%. The 2024/25 full year final position was c.£2m lower than the departmental forecast reported at Q3. This is primarily due to in-year reductions driven by revised delivery timelines in several projects where costs will be incurred at a future point.","wholeLifeCost":2884.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 2836 to 2884. This is primarily due to the following factors‚ Programme delivery was expected to conclude within a 10 year timeframe whereas the current programme is for 15 years. Given the extended life of the programme, discounted HMT WLC cost have increased but are still within the original programme WLC.","benefits":107.3,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 74 to 107. This is primarily due to the following factors‚ Monetised benefits represent estate running cost savings as a result of exiting legacy estate and moving into new Regional Centres and Specialist sites.","themes":["Cost & funding","Delivery & schedule","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The programme has successfully delivered 12 award winning, greener offices enabling smarter working and accommodating over 40 government departments. We are…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 05/04/2031. This is primarily due to the following factors‚ We are continuing to secure long term locations for HMRC. Taking this into consideration, the current assumption remains that the Programme will close in 2030/31.","narrativeClaimKind":null},"ratingDelta":-1,"transition":"Improved","endDateDeltaDays":0,"attentionScore":2,"attentionReasons":["In-year forecast variance is +5.3%"]},{"id":"DBT_0295_2526-Q2","year":2026,"name":"Drive 35","department":"DBT","category":"Infrastructure and Construction","description":"DRIVE35 is a cross-government major programme led by DBT to support the end-to-end transformation of the UK automotive sector, with a focus on accelerating the transition to zero-emission vehicles and strengthening domestic manufacturing capability. The programme brings together a portfolio of interventions including capital grants, R&D support, and scale-up financing to support both early-stage innovation and commercial deployment. It targets strategic segments of the automotive supply chain, including battery manufacturing, power electronics, and critical component production, with the aim of securing long-term investment, enhancing UK competitiveness, and supporting regional economic growth. DRIVE35 is designed as an integrated offer, working with partners across government and delivery bodies to provide blended finance and coordinated policy support. It aims to crowd in private investment, enable the development of industrial clusters, and support companies from innovation through to industrialisation.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"This is the first annual report for DRIVE35, the Delivery Confidence Assessment (DCA) rating at 25/26 Q4 is rated Green. This reflects a programme that is delivering substantial strategic value while accepting there are a number of delivery and operational challenges typical of a complex cross-government portfolio. Key factors influencing the assessment include: organisational changes and resourcing pressures affecting delivery capacity and continuity; the complexity of governance arrangements across policy, delivery, and external partners; and the need to maintain pace and clarity in decision-making to remain internationally competitive. The Department has taken steps to mitigate these risks through strengthening programme management capability, enhancing PMO support, and increasing focus on strategic risk management and governance maturity. There is active senior oversight through established boards and regular risk review processes. Overall, while challenges remain, the programme is considered deliverable with continued focus on strengthening delivery capability, improving process efficiency, and maintaining a clear strategic narrative for investors and stakeholders.","startDate":null,"endDate":"2030-04-30","scheduleNarrative":"This is the first annual report for DRIVE35, the Programme end date is currently 31/03/2030 with a planned 5 year extension to March 2035.","fyBaseline":281.49,"fyForecast":266.92,"fyVariance":5.18,"varianceNarrative":"The budget variance is less than or equal to 5%","wholeLifeCost":1841.78,"costNarrative":"This is the first annual report for DRIVE35, the Programme Whole life costs are £2.04bn.","benefits":20338.15,"benefitsNarrative":"This is the first annual report for DRIVE35, the Programme DRIVE35, benefits at 25/26 Q4 are reported at £2,397.4m.","themes":["Delivery & schedule","Governance & assurance","Workforce & capability","Cost & funding"],"evidenceExcerpt":"This is the first annual report for DRIVE35, the Delivery Confidence Assessment (DCA) rating at 25/26 Q4 is rated Green. This reflects a programme that is delivering substantial strategic value while accepting there are a number of delivery and operational challenges typical of a complex cross-government portfolio. Key factors influencing the assessment…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"This is the first annual report for DRIVE35, the Programme end date is currently 31/03/2030 with a planned 5 year extension to March 2035.","narrativeClaimKind":null,"history":[{"id":"DBT_0295_2526-Q2","year":2026,"name":"Drive 35","department":"DBT","category":"Infrastructure and Construction","description":"DRIVE35 is a cross-government major programme led by DBT to support the end-to-end transformation of the UK automotive sector, with a focus on accelerating the transition to zero-emission vehicles and strengthening domestic manufacturing capability. The programme brings together a portfolio of interventions including capital grants, R&D support, and scale-up financing to support both early-stage innovation and commercial deployment. It targets strategic segments of the automotive supply chain, including battery manufacturing, power electronics, and critical component production, with the aim of securing long-term investment, enhancing UK competitiveness, and supporting regional economic growth. DRIVE35 is designed as an integrated offer, working with partners across government and delivery bodies to provide blended finance and coordinated policy support. It aims to crowd in private investment, enable the development of industrial clusters, and support companies from innovation through to industrialisation.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"This is the first annual report for DRIVE35, the Delivery Confidence Assessment (DCA) rating at 25/26 Q4 is rated Green. This reflects a programme that is delivering substantial strategic value while accepting there are a number of delivery and operational challenges typical of a complex cross-government portfolio. Key factors influencing the assessment include: organisational changes and resourcing pressures affecting delivery capacity and continuity; the complexity of governance arrangements across policy, delivery, and external partners; and the need to maintain pace and clarity in decision-making to remain internationally competitive. The Department has taken steps to mitigate these risks through strengthening programme management capability, enhancing PMO support, and increasing focus on strategic risk management and governance maturity. There is active senior oversight through established boards and regular risk review processes. Overall, while challenges remain, the programme is considered deliverable with continued focus on strengthening delivery capability, improving process efficiency, and maintaining a clear strategic narrative for investors and stakeholders.","startDate":null,"endDate":"2030-04-30","scheduleNarrative":"This is the first annual report for DRIVE35, the Programme end date is currently 31/03/2030 with a planned 5 year extension to March 2035.","fyBaseline":281.49,"fyForecast":266.92,"fyVariance":5.18,"varianceNarrative":"The budget variance is less than or equal to 5%","wholeLifeCost":1841.78,"costNarrative":"This is the first annual report for DRIVE35, the Programme Whole life costs are £2.04bn.","benefits":20338.15,"benefitsNarrative":"This is the first annual report for DRIVE35, the Programme DRIVE35, benefits at 25/26 Q4 are reported at £2,397.4m.","themes":["Delivery & schedule","Governance & assurance","Workforce & capability","Cost & funding"],"evidenceExcerpt":"This is the first annual report for DRIVE35, the Delivery Confidence Assessment (DCA) rating at 25/26 Q4 is rated Green. This reflects a programme that is delivering substantial strategic value while accepting there are a number of delivery and operational challenges typical of a complex cross-government portfolio. Key factors influencing the assessment…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"This is the first annual report for DRIVE35, the Programme end date is currently 31/03/2030 with a planned 5 year extension to March 2035.","narrativeClaimKind":null}],"previous":null,"ratingDelta":null,"transition":"Not comparable","endDateDeltaDays":null,"attentionScore":2,"attentionReasons":["In-year forecast variance is +5.2%"]},{"id":"MOJ_0259_2324-Q1","year":2026,"name":"Secure Children's Homes Commissioning","department":"MOJ","category":"Government Transformation and Service Delivery","description":"The project aims to improve children's experiences in custody and their life outcomes by ensuring that there is an aligned cross government approach to Secure Children's Homes and that justice provision is commissioned to deliver consistently optimal care.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25-Q4, the Delivery Confidence Assessment at 25/26-Q4 has increased to Green. This is due to the completion of all transition activities. The project is on schedule to close in line with project plan.","startDate":"2022-07-28","endDate":"2026-04-30","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end date at 25/26-Q4 changed from 31/03/26 to 30/04/26. This is primarily due to the project allowing additional time to ensure a full closure process is completed.","fyBaseline":10.56,"fyForecast":11.07,"fyVariance":4.83,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":270.91,"costNarrative":"Compared to financial year 24/25-Q4, the project's Whole Life Costs at 25/26-Q4 increased from £246.01m to £270.91m. This is primarily due to the additional funds being made available to maintain as much capacity as possible within the custodial sector. All costs have been reported in 2024/25 base prices in line with NISTA requirements. This is a change from previous years where costs were reported in nominal prices. All costs reflect this accounting reduction regardless of any actual changes.","benefits":null,"benefitsNarrative":"This project currently reports no monetised benefits. The project benefits focus on the quality of services contracts.","themes":["Cost & funding","Delivery & schedule","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 24/25-Q4, the Delivery Confidence Assessment at 25/26-Q4 has increased to Green. This is due to the completion of all transition activities. The project is on schedule to close in line with project plan. Compared to financial year 24/25-Q4, the project's end date at 25/26-Q4 changed from 31/03/26 to 30/04/26. This is primarily due…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end date at 25/26-Q4 changed from 31/03/26 to 30/04/26. This is primarily due to the project allowing additional time to ensure a full closure process is completed.","narrativeClaimKind":null,"history":[{"id":"MOJ_0259_2324-Q1","year":2024,"name":"Secure Children's Homes Commissioning","department":"MOJ","category":"Government Transformation and Service Delivery","description":"The project aims to improve children's experiences in custody and their life outcomes by ensuring that there is an aligned cross government approach to Secure Children's Homes and that justice provision is commissioned to deliver consistently optimal care.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. This is the first time data has been published for this project, which has been added to GMPP over the last year. The Amber Delivery Confidence Assessment is driven by inflation risks contributing to the increasing cost estimate, which is greater than that estimated previously.","startDate":"2022-07-28","endDate":"2026-04-01","scheduleNarrative":"The project's end-date at 23/24-Q4 is 2026-04-01. This is primarily due to the following factors. The project is on track to deliver against the baselined schedule.","fyBaseline":31.4,"fyForecast":30.8,"fyVariance":-2.0,"varianceNarrative":"The budget variance is inferior or equal to 5%.","wholeLifeCost":390.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 23/24-Q4 is 390m. This is primarily due to the following factors. The Whole Life Costs are based on the most recent business case and include optimism bias.","benefits":0.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 0m. This project currently reports no monetised benefits. The project benefits focus on the quality of services contracts.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Commercial & supply chain"],"evidenceExcerpt":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. This is the first time data has been published for this project, which has been added to GMPP over the last year. The Amber Delivery Confidence Assessment is driven by inflation risks contributing to the increasing cost…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 23/24-Q4 is 2026-04-01. This is primarily due to the following factors. The project is on track to deliver against the baselined schedule.","narrativeClaimKind":null},{"id":"MOJ_0259_2324-Q1","year":2025,"name":"Secure Children's Homes Commissioning","department":"MoJ","category":"Government Transformation and Service Delivery","description":"The project aims to improve children's experiences in custody and their life outcomes by ensuring that there is an aligned cross government approach to Secure Children's Homes and that justice provision is commissioned to deliver consistently optimal care.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Inflation risks could increase the cost estimate.","startDate":"2022-07-28","endDate":"2026-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 decreased from 01/04/2026 to 31/03/2026. This is primarily due to the following factors‚ The project is on track to deliver against the baseline schedule.","fyBaseline":1.51,"fyForecast":1.43,"fyVariance":5.3,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":246.01,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 390 to 246. This is primarily due to the following factors‚ The decrease reflects the removal of previous contract running costs from before the project started.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ This project currently reports no monetised benefits. The project benefits focus on the quality of services contracts.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Inflation risks could increase the cost estimate. Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 decreased from 01/04/2026 to 31/03/2026.…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 decreased from 01/04/2026 to 31/03/2026. This is primarily due to the following factors‚ The project is on track to deliver against the baseline schedule.","narrativeClaimKind":null},{"id":"MOJ_0259_2324-Q1","year":2026,"name":"Secure Children's Homes Commissioning","department":"MOJ","category":"Government Transformation and Service Delivery","description":"The project aims to improve children's experiences in custody and their life outcomes by ensuring that there is an aligned cross government approach to Secure Children's Homes and that justice provision is commissioned to deliver consistently optimal care.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 24/25-Q4, the Delivery Confidence Assessment at 25/26-Q4 has increased to Green. This is due to the completion of all transition activities. The project is on schedule to close in line with project plan.","startDate":"2022-07-28","endDate":"2026-04-30","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end date at 25/26-Q4 changed from 31/03/26 to 30/04/26. This is primarily due to the project allowing additional time to ensure a full closure process is completed.","fyBaseline":10.56,"fyForecast":11.07,"fyVariance":4.83,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":270.91,"costNarrative":"Compared to financial year 24/25-Q4, the project's Whole Life Costs at 25/26-Q4 increased from £246.01m to £270.91m. This is primarily due to the additional funds being made available to maintain as much capacity as possible within the custodial sector. All costs have been reported in 2024/25 base prices in line with NISTA requirements. This is a change from previous years where costs were reported in nominal prices. All costs reflect this accounting reduction regardless of any actual changes.","benefits":null,"benefitsNarrative":"This project currently reports no monetised benefits. The project benefits focus on the quality of services contracts.","themes":["Cost & funding","Delivery & schedule","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 24/25-Q4, the Delivery Confidence Assessment at 25/26-Q4 has increased to Green. This is due to the completion of all transition activities. The project is on schedule to close in line with project plan. Compared to financial year 24/25-Q4, the project's end date at 25/26-Q4 changed from 31/03/26 to 30/04/26. This is primarily due…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end date at 25/26-Q4 changed from 31/03/26 to 30/04/26. This is primarily due to the project allowing additional time to ensure a full closure process is completed.","narrativeClaimKind":null}],"previous":{"id":"MOJ_0259_2324-Q1","year":2025,"name":"Secure Children's Homes Commissioning","department":"MoJ","category":"Government Transformation and Service Delivery","description":"The project aims to improve children's experiences in custody and their life outcomes by ensuring that there is an aligned cross government approach to Secure Children's Homes and that justice provision is commissioned to deliver consistently optimal care.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Inflation risks could increase the cost estimate.","startDate":"2022-07-28","endDate":"2026-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 decreased from 01/04/2026 to 31/03/2026. This is primarily due to the following factors‚ The project is on track to deliver against the baseline schedule.","fyBaseline":1.51,"fyForecast":1.43,"fyVariance":5.3,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":246.01,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 390 to 246. This is primarily due to the following factors‚ The decrease reflects the removal of previous contract running costs from before the project started.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ This project currently reports no monetised benefits. The project benefits focus on the quality of services contracts.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Inflation risks could increase the cost estimate. Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 decreased from 01/04/2026 to 31/03/2026.…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 decreased from 01/04/2026 to 31/03/2026. This is primarily due to the following factors‚ The project is on track to deliver against the baseline schedule.","narrativeClaimKind":null},"ratingDelta":-1,"transition":"Improved","endDateDeltaDays":30,"attentionScore":2,"attentionReasons":["Published end date moved 30 days later"]},{"id":"DFT_0031_1819-Q1","year":2026,"name":"A428 BLACK CAT TO CAXTON GIBBET","department":"DFT","category":"Infrastructure and Construction","description":"The scheme provides a new off-line two lane dual carriageway between Black Cat roundabout on the A1 in Bedfordshire and Caxton Gibbet roundabout on the A428 in Cambridgeshire.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The SRO Delivery Confidence Assessment (DCA) rating remained Green in Q4 25/26, consistent with the position reported in Q4 24/25. The A428 Black Cat to Caxton Gibbet scheme passed the halfway point of its construction phase at the start of Q3 25/26 and continues to perform in line with agreed delivery commitments. Construction activity is progressing well across all key locations, including the Black Cat junction upgrade and the opening of new local junctions and route improvements. There have been no changes to the approved cost or benefits forecasts, and the scheme remains on track to deliver within the agreed funding envelope.","startDate":"2015-04-01","endDate":null,"scheduleNarrative":"Exempt under Section 43 - Commercial interests","fyBaseline":242.0,"fyForecast":232.37,"fyVariance":3.98,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Exempt under Section 43 - Commercial interests","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"The SRO Delivery Confidence Assessment (DCA) rating remained Green in Q4 25/26, consistent with the position reported in Q4 24/25. The A428 Black Cat to Caxton Gibbet scheme passed the halfway point of its construction phase at the start of Q3 25/26 and continues to perform in line with agreed delivery commitments. Construction activity is progressing well…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 43 - Commercial interests","narrativeClaimKind":null,"history":[{"id":"DFT_0031_1819-Q1","year":2020,"name":"A428 Black Cat to Caxton Gibbet","department":"DFT","category":"Infrastructure and Construction","description":"The scheme provides a new off-line two lane dual carriageway between Black Cat roundabout on the A1 in Bedfordshire and Caxton Gibbet roundabout on the A428 in Cambridgeshire.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber/Green, which has not changed since last year�s Q2 1819 Amber/Green, due primarily to the following factors; - The Preferred Route Announcement was made on the 18 February 2019. The project milestones remain on track for delivery. - There continues to be strong stakeholder support and interest for this project demonstrated by the positive outcome from the Statutory Consultation - Funding for the delivery of this project has been included within the Roads Period 2 spending envelope announced in March 2020. The associated benefits case has been approved by Treasury. Since the Q2 1920 (30th September 2019) Amber/Green IPA DCA, the following non-project operating environment activities have impacted the original Q2 IPA DCA; - Changes in the Design Manual for Road and Bridges resulted in some design rework but this is not anticipated to affect overall programme. Changes in the uncertainty log resulting from increased developments and employment areas within the local plans are being analysed and will be included within the project design. - East West Rail Company have announced their corridor route for the central section (Bedford to Cambridge) which is currently expected to be constructed after the A428. Areas of potential overlap are being discussed to maximise the opportunity for close collaboration. Since the Q2 1920 (30th September 2019) Amber/Green IPA DCA, the following primary project actions have impacted the original Q2 IPA DCA; - Approval from HM Treasury in Feb 2020 followed by the announcement of funding of the project as part of RIS2 in the March 2020 Budget Statement. IPA recommendations from PAR in July and September 2019 have been actioned - Formal mobilisation of the Regional Delivery Partnership Framework (RDP) contract has begun for the project. This closed the IPA recommendation to engage with the RDP as soon as possible to finalise budget.","startDate":"2015-04-01","endDate":"2025-04-01","scheduleNarrative":"The scheduled baseline project end date at Q2 1920 (30th September 2019) is 01/04/25, has not changed since last year's Q2 1819 date of 01/04/25, due primarily to the following factors; - Formal mobilisation of RDP has commenced meaning that the production of the detailed design will run in parallel with the DCO allowing construction to begin early in 2022. The construction period remains unchanged. - The project schedule has been fully assessed and baselined. The project is currently undergoing budget setting with the contractor and once this work is completed a further review of the schedule can be undertaken. Since the Q2 1920 (30th September 2019) baseline project end date of 01/04/25, the following non-project operating environment activities have impacted the original Q2 baseline project end date; - The impact of Covid19 on the completion of environmental surveys and archaeological trial trenching may result in a delay to the DCO submission. The project team are assessing ways of mitigating this risk Since the Q2 1920 (30th September 2019) baseline project end date of 01/04/25, the following primary project actions have impacted the original Q2 baseline project end date; - Additional targeted consultation will be carried out to seek stakeholder views on a number of areas highlighted in the review of \"buildability\". This is scheduled for summer 2020 and the results will be fed into the DCO submission. This consultation will be \"virtual\" given the Covid 19 pandemic. - Covid 19 has resulted in one instance when site operations where closed for a week due to a staff member testing positive. Schedule impacts are being mitigated and future impacts being considered as pandemic restrictions develop and/or change.","fyBaseline":11.02,"fyForecast":19.3,"fyVariance":75.0,"varianceNarrative":"The 19/20 in-year baseline / forecast variance at Q2 1920 (30th September 2019) of 75%, is due primarily to the following factors; - The 2019-20 forecast increased from �11.02m to �19.3m as a result of delays to the Preferred Route Announcement in the previous financial year and reprofiling of future funds to allow the project to progress archaeological and ground investigation works and derisk the project. Since the Q2 1920 (30th September 2019) 19/20 in-year baseline / forecast variance of 75%, the following non-project operating environment activities have impacted the original Q2 19/20 in-year baseline / forecast variance; - The delay to the Preferred Route Announcement further delayed activities which were undertaken in 19/20. Since the Q2 1920 (30th September 2019) 19/20 in-year baseline / forecast variance of 75%, the following primary project actions have impacted the original Q2 19/20 in-year variance; - To inform the Development Consent Order, early contractor involvement has been built into the forecast as this will reduce risk and provide increased confidence in the proposed solution.","wholeLifeCost":809.98,"costNarrative":"The baseline Whole Life Cost at Q2 1920 (30th September 2019) is �809.98m, has not changed since last year's Q2 1819 (�m) baseline Whole Life Cost, due primarily to the following factors; - The project baseline has remained constant at �810m throughout the period. Since the Q2 1920 (30th September 2019) �809.98 m baseline Whole Life Cost, the following non-project operating environment activities have impacted the original baseline Q2 Whole Life Cost; - There are no non-project operating environment activities that have impacted the original baseline Q2 Whole Life Costs. Since the Q2 1920 (30th September 2019) �809.98 m baseline Whole Life Cost, the following primary project actions have impacted the original Q2 baseline Whole Life Cost; - The project compiled a new baseline estimate . The paper was approved by Treasury in early 2020 and reflects the most recent commercial estimate whole life cost. - The formal budget setting process has commenced within the Regional Delivery Partnership Framework. It is anticipated that due to the improved ways of working that a reduction in the Whole Life Cost is achievable and this approach will be fully documented.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Scope & requirements","Approvals & decisions"],"evidenceExcerpt":"The IPA Delivery Confidence Assessment (DCA) rating at Q2 1920 (30th September 2019) was Amber/Green, which has not changed since last year�s Q2 1819 Amber/Green, due primarily to the following factors; - The Preferred Route Announcement was made on the 18 February 2019. The project milestones remain on track for delivery. - There continues to be strong…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2020","sourceLabel":"IPA Annual Report 2019-20","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The scheduled baseline project end date at Q2 1920 (30th September 2019) is 01/04/25, has not changed since last year's Q2 1819 date of 01/04/25, due primarily to the following factors; - Formal mobilisation of RDP has commenced meaning that the production of the detailed design will run in parallel with the DCO allowing construction to begin early in 2022. The construction period remains unchanged. - The project schedule has been fully assessed and baselined. The project is currently undergoing budget setting with the contractor and once this work is completed a further review of the schedule can be undertaken. Since the Q2 1920 (30th September 2019) baseline project end date of 01/04/25, the following non-project operating environment activities have impacted the original Q2 baseline project end date; - The impact of Covid19 on the completion of environmental surveys and archaeological trial trenching may result in a delay to the DCO submission. The project team are assessing ways of mitigating this risk Since the Q2 1920 (30th September 2019) baseline project end date of 01/04/25, the following primary project actions have impacted the original Q2 baseline project end date; - Additional targeted consultation will be carried out to seek stakeholder views on a number of areas highlighted in the review of \"buildability\". This is scheduled for summer 2020 and the results will be fed into the DCO submission. This consultation will be \"virtual\" given the Covid 19 pandemic. - Covid 19 has resulted in one instance when site operations where closed for a week due to a staff member testing positive. Schedule impacts are being mitigated and future impacts being considered as pandemic restrictions develop and/or change.","narrativeClaimKind":null},{"id":"DFT_0031_1819-Q1","year":2021,"name":"A428 Black Cat to Caxton Gibbet","department":"DFT","category":"Infrastructure and Construction","description":"The scheme provides a new off-line two lane dual carriageway between Black Cat roundabout on the A1 in Bedfordshire and Caxton Gibbet roundabout on the A428 in Cambridgeshire.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber/Green. This is primarily due to the following factors: With the projects submission and acceptance of the Development Consent Order (DCO), and now working with the Delivery Integration Partners under the Regional Delivery Partnership Framework (RDP) contract, the project can further develop it's delivery schedule. This will in turn inform the development of the Full Business Case.","startDate":"2015-04-01","endDate":"2025-04-01","scheduleNarrative":"Compared to financial year 19/20-Q2, the project's end-date remained scheduled to finish on 01 April 2025 . This is primarily due to the following factors: The A428 Black Cat to Caxton Gibbet Improvement project is currently in the development phase. Statutory Consultation (Jun-Jul 2019) and a supplementary non-statutory consultation (Jun-Jul 2020) have been completed, and the Development Consent Order (DCO) submission was made at the end of February 2021. The DCO Acceptance was received on 24 March 2021. A detailed DCO examination timetable will be issued by the Planning Inspectorate (PINS) in Q1 2021/22. The examination timetable will be incorporated into a formal re-baselining later in the summer (Q2 2021/22). The formal re-baselining will provide an update to both the Open for Traffic date and the project end date. There continues to be strong stakeholder support and interest for this project demonstrated by the results from Statutory Consultation and from feedback received at the events themselves. Subsequent engagements via community forums and technical working groups continues to demonstrate support for the project.","fyBaseline":25.0,"fyForecast":25.0,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%. The project was required to carry out additional consultation ahead of progressing to the Development Consent Order process. The budget variance was due to a delay in completion of the preliminary design stage required to accommodate the results of the additional consultation.","wholeLifeCost":812.5,"costNarrative":"Compared to financial year 19/20-Q2, the projects Baseline Whole Life Cost increased from �809.98m to �812.50m. This is primarily due to the following factors: The Budget Whole Life Cost has followed a central estimate which matures throughout the scheme budget setting process and continues to mature whilst we execute contracts with our delivery partners. Throughout the Development Consent Order process and Detailed Design stage the central estimate will continue to be developed and the forecast costs for construction will be assured further. These changes include changes in non recoverable VAT assessment. A revised Central Estimate will feed into the Full Business Case and account for all project costs and risks.","benefits":null,"benefitsNarrative":"","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 19/20-Q2, the Infrastructure Project Authority's Delivery Confidence Assessment rating remained at Amber/Green. This is primarily due to the following factors: With the projects submission and acceptance of the Development Consent Order (DCO), and now working with the Delivery Integration Partners under the Regional Delivery…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2021","sourceLabel":"IPA Annual Report 2020-21","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 19/20-Q2, the project's end-date remained scheduled to finish on 01 April 2025 . This is primarily due to the following factors: The A428 Black Cat to Caxton Gibbet Improvement project is currently in the development phase. Statutory Consultation (Jun-Jul 2019) and a supplementary non-statutory consultation (Jun-Jul 2020) have been completed, and the Development Consent Order (DCO) submission was made at the end of February 2021. The DCO Acceptance was received on 24 March 2021. A detailed DCO examination timetable will be issued by the Planning Inspectorate (PINS) in Q1 2021/22. The examination timetable will be incorporated into a formal re-baselining later in the summer (Q2 2021/22). The formal re-baselining will provide an update to both the Open for Traffic date and the project end date. There continues to be strong stakeholder support and interest for this project demonstrated by the results from Statutory Consultation and from feedback received at the events themselves. Subsequent engagements via community forums and technical working groups continues to demonstrate support for the project.","narrativeClaimKind":null},{"id":"DFT_0031_1819-Q1","year":2022,"name":"A428 Black Cat to Caxton Gibbet","department":"DFT","category":"Infrastructure and Construction","description":"The scheme provides a new off-line two lane dual carriageway between Black Cat roundabout on the A1 in Bedfordshire and Caxton Gibbet roundabout on the A428 in Cambridgeshire.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 20/21-Q4, the Delivery Confidence Assessment rating at 21/22-Q4 increased from Amber/Green to Amber. The A428 Black Cat to Caxton Gibbet Project is currently in the development phase. The Development Consent Order (DCO) examination process has concluded and a decision from the Secretary of State's (SoS) is due by mid-August 2022. It is noted that any delay to DCO decision would have non-linear impact to the programme due to seasonal constraints.","startDate":"2015-04-01","endDate":"2027-09-09","scheduleNarrative":"Compared to 2021-Q4, your project end-date increased from 01 APR 2025 to 09 SEP 2027. This is primarily due to the following factors: The Development Consent Order (DCO) planning application was submitted on 26 February 2021 and the Examining Authority commenced the DCO examination in August 2021, 9 months later than forecast in the OBC. The project has since undertaken significant rework of the construction schedule to absorb this delay to the DCO, and the construction requirement for three summer earthwork seasons, whilst successfully maintaining the current Open for Traffic (OfT) date.","fyBaseline":48.3,"fyForecast":28.1,"fyVariance":-42.0,"varianceNarrative":"The DCO application was submitted later than anticipated to allow the incorporation of lessons learnt from other unsuccessful applications. The DCO examination also started later than expected due to a longer DCO pre-examination period imposed by PINS. As a result, the programme was rephased and the spike associated with the commencement of construction, budgeted in 2021/22 will now occur in the following year, subject to the DCO being granted in August 2022.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"","themes":["Approvals & decisions","Delivery & schedule","Commercial & supply chain","Cost & funding"],"evidenceExcerpt":"Compared to financial year 20/21-Q4, the Delivery Confidence Assessment rating at 21/22-Q4 increased from Amber/Green to Amber. The A428 Black Cat to Caxton Gibbet Project is currently in the development phase. The Development Consent Order (DCO) examination process has concluded and a decision from the Secretary of State's (SoS) is due by mid-August 2022.…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to 2021-Q4, your project end-date increased from 01 APR 2025 to 09 SEP 2027. This is primarily due to the following factors: The Development Consent Order (DCO) planning application was submitted on 26 February 2021 and the Examining Authority commenced the DCO examination in August 2021, 9 months later than forecast in the OBC. The project has since undertaken significant rework of the construction schedule to absorb this delay to the DCO, and the construction requirement for three summer earthwork seasons, whilst successfully maintaining the current Open for Traffic (OfT) date.","narrativeClaimKind":null},{"id":"DFT_0031_1819-Q1","year":2023,"name":"A428 Black Cat to Caxton Gibbet","department":"DFT","category":"Infrastructure and Construction","description":"The scheme provides a new off-line two lane dual carriageway between Black Cat roundabout on the A1 in Bedfordshire and Caxton Gibbet roundabout on the A428 in Cambridgeshire.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 21/22-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. The A428 Black Cat to Caxton Gibbet Project is currently in the development phase. The Development Consent Order (DCO) process has concluded with Secretary of States (SoS) granting consent for the scheme August 2022. There have been delays to the schemes delivery plan milestones due to a Judicial Review challenge. The impact of delays associated with the legal process has significantly impacted the projects programme and cost. The project will be returning through governance beginning in Q2 2023/2024 for approval of an updated Full Business Case and re-baseline.","startDate":"2015-04-01","endDate":null,"scheduleNarrative":"There have been delays to the schemes delivery plan milestones due to a Judicial Review challenge. The impact of delays associated with the legal process has significantly impacted the projects programme. The project will be returning through governance with a full impact analysis of delay and re-baseline, ahead of Start of Works.","fyBaseline":60.0,"fyForecast":34.4,"fyVariance":-43.0,"varianceNarrative":"There have been delays to the schemes delivery plan milestones due to a Judicial Review challenge. The impact of delays associated with the legal process has significantly impacted the projects programme and cost. The scheme missed the planned Start of Works milestone for December 2022, which has decreased the in year costs reflecting the reduced activity necessitated by the legal challenge.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","themes":["Delivery & schedule","Governance & assurance","Approvals & decisions","Cost & funding"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber. This is primarily due to the following factors. The A428 Black Cat to Caxton Gibbet Project is currently in the development phase. The Development Consent Order (DCO) process has concluded with Secretary of States (SoS)…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"There have been delays to the schemes delivery plan milestones due to a Judicial Review challenge. The impact of delays associated with the legal process has significantly impacted the projects programme. The project will be returning through governance with a full impact analysis of delay and re-baseline, ahead of Start of Works.","narrativeClaimKind":null},{"id":"DFT_0031_1819-Q1","year":2024,"name":"A428 Black Cat to Caxton Gibbet","department":"DFT","category":"Infrastructure and Construction","description":"The scheme provides a new off-line two lane dual carriageway between Black Cat roundabout on the A1 in Bedfordshire and Caxton Gibbet roundabout on the A428 in Cambridgeshire.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 22/23-Q4, Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 decreased from Amber to Green. This is primarily due to the following factors. The A428 Black Cat to Caxton Gibbet is in the construction phase, achieving Start of Works milestone in November 2023. Chief Secretary to the Treasury approval of the updated Full Business Case and release full funding for the scheme was received in October 2023.","startDate":"2015-04-01","endDate":null,"scheduleNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","fyBaseline":57.1,"fyForecast":60.0,"fyVariance":5.0,"varianceNarrative":"The budget variance is inferior or equal to 5%.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","benefits":null,"benefitsNarrative":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","themes":["Commercial & supply chain","Cost & funding","Approvals & decisions","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 decreased from Amber to Green. This is primarily due to the following factors. The A428 Black Cat to Caxton Gibbet is in the construction phase, achieving Start of Works milestone in November 2023. Chief Secretary to the Treasury approval of the…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 43 of the Freedom of Information Act 2000 (Commercial Interests) - Commercial interests.","narrativeClaimKind":null},{"id":"DFT_0031_1819-Q1","year":2025,"name":"A428 BLACK CAT TO CAXTON GIBBET","department":"DfT","category":"Infrastructure and Construction","description":"The scheme provides a new off-line two lane dual carriageway between Black Cat roundabout on the A1 in Bedfordshire and Caxton Gibbet roundabout on the A428 in Cambridgeshire.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at GREEN. This is primarily due to the following factors‚ The A428 Black Cat to Caxton Gibbet is now over one year into the construction phase and remains on plan against the delivery commitments. Construction activities are progressing at pace with significant progress being made across the length and breadth of the scheme. The scheme has begun on the construction of all 18 new bridges and in early 2025 the scheme opened the first road bridge and junction to traffic. There have been no changes to the cost or benefits forecasts and remain on target and within approved funding.","startDate":"2015-04-01","endDate":null,"scheduleNarrative":"Section 43 - Commercial interests","fyBaseline":245.32,"fyForecast":237.92,"fyVariance":3.02,"varianceNarrative":"The budget variance is less than or equal to 5%. The budget variance is less than or equal to 5%.","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Section 43 - Commercial interests","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at GREEN. This is primarily due to the following factors‚ The A428 Black Cat to Caxton Gibbet is now over one year into the construction phase and remains on plan against the delivery commitments. Construction activities are…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Section 43 - Commercial interests","narrativeClaimKind":null},{"id":"DFT_0031_1819-Q1","year":2026,"name":"A428 BLACK CAT TO CAXTON GIBBET","department":"DFT","category":"Infrastructure and Construction","description":"The scheme provides a new off-line two lane dual carriageway between Black Cat roundabout on the A1 in Bedfordshire and Caxton Gibbet roundabout on the A428 in Cambridgeshire.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The SRO Delivery Confidence Assessment (DCA) rating remained Green in Q4 25/26, consistent with the position reported in Q4 24/25. The A428 Black Cat to Caxton Gibbet scheme passed the halfway point of its construction phase at the start of Q3 25/26 and continues to perform in line with agreed delivery commitments. Construction activity is progressing well across all key locations, including the Black Cat junction upgrade and the opening of new local junctions and route improvements. There have been no changes to the approved cost or benefits forecasts, and the scheme remains on track to deliver within the agreed funding envelope.","startDate":"2015-04-01","endDate":null,"scheduleNarrative":"Exempt under Section 43 - Commercial interests","fyBaseline":242.0,"fyForecast":232.37,"fyVariance":3.98,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":null,"costNarrative":"Exempt under Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Exempt under Section 43 - Commercial interests","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"The SRO Delivery Confidence Assessment (DCA) rating remained Green in Q4 25/26, consistent with the position reported in Q4 24/25. The A428 Black Cat to Caxton Gibbet scheme passed the halfway point of its construction phase at the start of Q3 25/26 and continues to perform in line with agreed delivery commitments. Construction activity is progressing well…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 43 - Commercial interests","narrativeClaimKind":null}],"previous":{"id":"DFT_0031_1819-Q1","year":2025,"name":"A428 BLACK CAT TO CAXTON GIBBET","department":"DfT","category":"Infrastructure and Construction","description":"The scheme provides a new off-line two lane dual carriageway between Black Cat roundabout on the A1 in Bedfordshire and Caxton Gibbet roundabout on the A428 in Cambridgeshire.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at GREEN. This is primarily due to the following factors‚ The A428 Black Cat to Caxton Gibbet is now over one year into the construction phase and remains on plan against the delivery commitments. Construction activities are progressing at pace with significant progress being made across the length and breadth of the scheme. The scheme has begun on the construction of all 18 new bridges and in early 2025 the scheme opened the first road bridge and junction to traffic. There have been no changes to the cost or benefits forecasts and remain on target and within approved funding.","startDate":"2015-04-01","endDate":null,"scheduleNarrative":"Section 43 - Commercial interests","fyBaseline":245.32,"fyForecast":237.92,"fyVariance":3.02,"varianceNarrative":"The budget variance is less than or equal to 5%. The budget variance is less than or equal to 5%.","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Section 43 - Commercial interests","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at GREEN. This is primarily due to the following factors‚ The A428 Black Cat to Caxton Gibbet is now over one year into the construction phase and remains on plan against the delivery commitments. Construction activities are…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Section 43 - Commercial interests","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":null,"attentionScore":0,"attentionReasons":[]},{"id":"DCMS_0254_2324-Q1","year":2026,"name":"British Museum - Energy Centre Programme (ECP)","department":"DCMS","category":"Infrastructure and Construction","description":"The Energy Centre Programme is a programme of major infrastructure works that are designed to improve energy generation, rationalise services distribution, and provide improved resilience for the Bloomsbury estate. The project is a key enabler which will support ongoing asset and infrastructure renewal and the emerging aspirations of the Museum’s Masterplan. Some of the key elements of the project include – · Review of the Museum’s energy strategy and development of an energy transition plan · Development of a new primary services infrastructure strategy for the Bloomsbury estate · Design, construction and mobilisation of a new energy centre Delivery of a new low carbon, energy efficient heating and cooling system that helps pave the way to a net zero future.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to the financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at GREEN. The last review was conducted in October 2024, with the next review being due in October 2026. The Energy Centre Programme has generally been progressed over the last 12 months on schedule against the agreed programme and within budget. The two main building contracts were awarded on schedule and within budget in both instances.","startDate":"2022-04-01","endDate":"2029-12-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same at 31/12/2029. This is primarily due to the following factors: The early stage enabling works projects have been completed within the agreed programme. Any delays that have been incurred to date on the construction of the East Road Building have been non-critical to the overall programme. The two main building contracts (SWEC Main Works and SWEC MEP) works are currently being progressed in line with scheduled completion dates in June 2029.","fyBaseline":20.15,"fyForecast":20.15,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than 5%. Individual projects have generally been progressed in line with planned schedules and cashflow forecasts thereby avoiding a potential underspend. There has been minimal client-driven change during the period, and the discovery-related change has been contained within allocated risk allowances, thereby avoiding a potential overspend.","wholeLifeCost":181.97,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) remained at £194m. This is primarily due to the following factors: Procurement of the two main building contracts within budget. Change managed within allocated risk allowances. No significant commercial claims from contractors Please note figures referenced in the narratives were entered as nominal and the system automatically converts them to Real Terms.","benefits":192.57,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at £350m. There has been no change to the original underlying assumptions at this stage, so there is no change to the calculated benefits.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Commercial & supply chain"],"evidenceExcerpt":"Compared to the financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at GREEN. The last review was conducted in October 2024, with the next review being due in October 2026. The Energy Centre Programme has generally been progressed over the last 12 months on schedule against the agreed programme and within…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same at 31/12/2029. This is primarily due to the following factors: The early stage enabling works projects have been completed within the agreed programme. Any delays that have been incurred to date on the construction of the East Road Building have been non-critical to the overall programme. The two main building contracts (SWEC Main Works and SWEC MEP) works are currently being progressed in line with scheduled completion dates in June 2029.","narrativeClaimKind":null,"history":[{"id":"DCMS_0254_2324-Q1","year":2024,"name":"British Museum Energy Centre Programme (ECP)","department":"DCMS","category":"Infrastructure and Construction","description":"Develop a coherent, site-wide approach to infrastructure, powered by a new state of the art energy transition hub. with the objectives to: Reduce carbon emissions To reduce and mitigate critical risks of harm to people, buildings and collection, and of service failure leading to localised or complete closure of the Museum. To enable future phases of the masterplan, e.g. by unlocking planning permission, creating essential space and enabling access.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. The project's IPA DCA rating is Amber. This is primarily due to the following factors: the Full Business Case was not approved by HMT at the time of the rating. Due to the nature of the programme's staged procurement, the main contacts have not yet been tendered. Since the issue of IPA's Amber DCA, the programme has received HMT approval for the Full Business Case. The programme team continue to develop changes in response to the IPA review recommendations from January 2024.","startDate":"2022-04-01","endDate":"2029-12-31","scheduleNarrative":"The project's end-date at 23/24-Q4 is 2029-12-31. This is primarily due to the following factors: the programme remains on schedule to deliver its objectives by 31 December 2029.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"The budget variance is inferior or equal to 5%. Flexibility to apply funding temporarily to other projects has been utilised and reported accordingly here.","wholeLifeCost":209.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 23/24-Q4 is 209m. This is primarily due to the following factors: the budgeted whole life costs are from the HMT approved Full Business Case.","benefits":351.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 351m.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Commercial & supply chain"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. The project's IPA DCA rating is Amber. This is primarily due to the following factors: the Full Business Case was not approved by HMT at the time of the rating. Due to the nature of the programme's staged…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 23/24-Q4 is 2029-12-31. This is primarily due to the following factors: the programme remains on schedule to deliver its objectives by 31 December 2029.","narrativeClaimKind":null},{"id":"DCMS_0254_2324-Q1","year":2025,"name":"British Museum - Energy Centre Programme (ECP)","department":"DCMS","category":"Infrastructure and Construction","description":"As an essential step towards the BM’s net zero-carbon future and a more resilient estate, the Energy Centre Programme will introduce a coherent, site-wide approach to infrastructure, powered by a new state-of-the-art energy transition hub. This project will improve resilience and flexibility, reduce risk to the collection, and release valuable space on a crowded site. Replacing inefficient plant and introducing greater simplicity will improve operating efficiency and reduce the increasing burden of maintenance programmes.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors‚ - The Stage 4 design was progressing well with no major issues or problems. - The programme had sufficient contingency to meet costs. - A delivery manager had been appointed and was in the process of being embedded within the wider programme team. - The major planning consents had been granted, with only more minor ones pending. The conclusion of the Review Team (RT) following the IPA review was that there were no major outstanding issues that threatened the delivery of the programme at that stage, and that the strategic case for the programme was in the RT’s view, sensible.","startDate":"2022-04-01","endDate":"2029-12-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/12/2029. This is primarily due to the following factors‚ - Although there have been delays to the programme that have affected the expenditure profile as detailed in the response to the in year variance question below, these delays are covered by the in-built programme contingency allowance meaning that the programme end date remains unchanged. - The construction of the East Road Building is progressing on programme. - The South-West Energy Centre enabling works are progressing on programme.","fyBaseline":36.2,"fyForecast":12.3,"fyVariance":66.02,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ - Delay to ERB planning approval and Section 106 agreement. - Delay to the completion of staff decant enabling works (39 Russell Square project). - Delay to the issue of survey information which subsequently delayed the design programme. - Delay to the main works procurement timeline due to market capacity. - Delay to the completion of ERB Enabling Works and subsequent delay to the commencement of ERB Main Works. - Contingency – An exercise was undertaken during the year to revisit the contingency levels and as a result £15m of contingency was removed from the overall budget.","wholeLifeCost":209.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 209. This is primarily due to the following factors‚ An exercise was undertaken during the 24/25 to revisit the contingency levels and as a result £15m of contingency was removed from the overall budget so the updated agreed whole life cost of the project is now £194m","benefits":351.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 351. This is primarily due to the following factors‚ There has been no change to the original underlying assumptions and so there is no change to the calculated benefits.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors‚ - The Stage 4 design was progressing well with no major issues or problems. - The programme had sufficient contingency to meet costs. - A delivery manager…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/12/2029. This is primarily due to the following factors‚ - Although there have been delays to the programme that have affected the expenditure profile as detailed in the response to the in year variance question below, these delays are covered by the in-built programme contingency allowance meaning that the programme end date remains unchanged. - The construction of the East Road Building is progressing on programme. - The South-West Energy Centre enabling works are progressing on programme.","narrativeClaimKind":null},{"id":"DCMS_0254_2324-Q1","year":2026,"name":"British Museum - Energy Centre Programme (ECP)","department":"DCMS","category":"Infrastructure and Construction","description":"The Energy Centre Programme is a programme of major infrastructure works that are designed to improve energy generation, rationalise services distribution, and provide improved resilience for the Bloomsbury estate. The project is a key enabler which will support ongoing asset and infrastructure renewal and the emerging aspirations of the Museum’s Masterplan. Some of the key elements of the project include – · Review of the Museum’s energy strategy and development of an energy transition plan · Development of a new primary services infrastructure strategy for the Bloomsbury estate · Design, construction and mobilisation of a new energy centre Delivery of a new low carbon, energy efficient heating and cooling system that helps pave the way to a net zero future.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to the financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at GREEN. The last review was conducted in October 2024, with the next review being due in October 2026. The Energy Centre Programme has generally been progressed over the last 12 months on schedule against the agreed programme and within budget. The two main building contracts were awarded on schedule and within budget in both instances.","startDate":"2022-04-01","endDate":"2029-12-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same at 31/12/2029. This is primarily due to the following factors: The early stage enabling works projects have been completed within the agreed programme. Any delays that have been incurred to date on the construction of the East Road Building have been non-critical to the overall programme. The two main building contracts (SWEC Main Works and SWEC MEP) works are currently being progressed in line with scheduled completion dates in June 2029.","fyBaseline":20.15,"fyForecast":20.15,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than 5%. Individual projects have generally been progressed in line with planned schedules and cashflow forecasts thereby avoiding a potential underspend. There has been minimal client-driven change during the period, and the discovery-related change has been contained within allocated risk allowances, thereby avoiding a potential overspend.","wholeLifeCost":181.97,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) remained at £194m. This is primarily due to the following factors: Procurement of the two main building contracts within budget. Change managed within allocated risk allowances. No significant commercial claims from contractors Please note figures referenced in the narratives were entered as nominal and the system automatically converts them to Real Terms.","benefits":192.57,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at £350m. There has been no change to the original underlying assumptions at this stage, so there is no change to the calculated benefits.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Commercial & supply chain"],"evidenceExcerpt":"Compared to the financial year 24/25 Q4, the NISTA/SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 remained at GREEN. The last review was conducted in October 2024, with the next review being due in October 2026. The Energy Centre Programme has generally been progressed over the last 12 months on schedule against the agreed programme and within…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same at 31/12/2029. This is primarily due to the following factors: The early stage enabling works projects have been completed within the agreed programme. Any delays that have been incurred to date on the construction of the East Road Building have been non-critical to the overall programme. The two main building contracts (SWEC Main Works and SWEC MEP) works are currently being progressed in line with scheduled completion dates in June 2029.","narrativeClaimKind":null}],"previous":{"id":"DCMS_0254_2324-Q1","year":2025,"name":"British Museum - Energy Centre Programme (ECP)","department":"DCMS","category":"Infrastructure and Construction","description":"As an essential step towards the BM’s net zero-carbon future and a more resilient estate, the Energy Centre Programme will introduce a coherent, site-wide approach to infrastructure, powered by a new state-of-the-art energy transition hub. This project will improve resilience and flexibility, reduce risk to the collection, and release valuable space on a crowded site. Replacing inefficient plant and introducing greater simplicity will improve operating efficiency and reduce the increasing burden of maintenance programmes.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors‚ - The Stage 4 design was progressing well with no major issues or problems. - The programme had sufficient contingency to meet costs. - A delivery manager had been appointed and was in the process of being embedded within the wider programme team. - The major planning consents had been granted, with only more minor ones pending. The conclusion of the Review Team (RT) following the IPA review was that there were no major outstanding issues that threatened the delivery of the programme at that stage, and that the strategic case for the programme was in the RT’s view, sensible.","startDate":"2022-04-01","endDate":"2029-12-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/12/2029. This is primarily due to the following factors‚ - Although there have been delays to the programme that have affected the expenditure profile as detailed in the response to the in year variance question below, these delays are covered by the in-built programme contingency allowance meaning that the programme end date remains unchanged. - The construction of the East Road Building is progressing on programme. - The South-West Energy Centre enabling works are progressing on programme.","fyBaseline":36.2,"fyForecast":12.3,"fyVariance":66.02,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ - Delay to ERB planning approval and Section 106 agreement. - Delay to the completion of staff decant enabling works (39 Russell Square project). - Delay to the issue of survey information which subsequently delayed the design programme. - Delay to the main works procurement timeline due to market capacity. - Delay to the completion of ERB Enabling Works and subsequent delay to the commencement of ERB Main Works. - Contingency – An exercise was undertaken during the year to revisit the contingency levels and as a result £15m of contingency was removed from the overall budget.","wholeLifeCost":209.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 209. This is primarily due to the following factors‚ An exercise was undertaken during the 24/25 to revisit the contingency levels and as a result £15m of contingency was removed from the overall budget so the updated agreed whole life cost of the project is now £194m","benefits":351.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 351. This is primarily due to the following factors‚ There has been no change to the original underlying assumptions and so there is no change to the calculated benefits.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors‚ - The Stage 4 design was progressing well with no major issues or problems. - The programme had sufficient contingency to meet costs. - A delivery manager…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/12/2029. This is primarily due to the following factors‚ - Although there have been delays to the programme that have affected the expenditure profile as detailed in the response to the in year variance question below, these delays are covered by the in-built programme contingency allowance meaning that the programme end date remains unchanged. - The construction of the East Road Building is progressing on programme. - The South-West Energy Centre enabling works are progressing on programme.","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":0,"attentionScore":0,"attentionReasons":[]},{"id":"DLUHC_0364_2324-Q4","year":2026,"name":"Brownfield, Infrastructure & Land (BIL)","department":"MHCLG","category":"Infrastructure and Construction","description":"Launched in July 2023, the Brownfield Infrastructure and Land (BIL) fund is a £1.5 billion programme designed to regenerate underused land and deliver transport links, boost local areas by transforming disused sites and investing in vital infrastructure, such as GP surgeries, primary schools and access roads and funding the decontamination of previously used land.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 increased to Green. This uplift is driven by BIL meeting and exceeding its target metrics (67k housing capacity unlocked against a 65.5k target, 500k sqm employment floorspace unlocked against a 200k sqm target, and 78% funding used on brownfield projects against a 72% target). Furthermore, all delivery partners have established strong delivery pipelines, providing a clear and credible route to future delivery. Key risks remain, particularly around cost pressures, contractor capacity and the Building Safety Act - particularly for higher-risk and more complex developments, which are generating additional design costs, extending pre-commencement timescales, and increased regulatory burden for developers.","startDate":"2023-07-01","endDate":"2031-03-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 increased from 31/03/2029 to 31/03/2031. The extension is isolated rather than programme-wide is driven by a single BIL National Project, which has received approval to spend BIL funds in 2029/30 and 2030/31. All other BIL projects remain on track to complete construction and spend by the original end date of 31 March 2029.","fyBaseline":400.33,"fyForecast":400.33,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":1506.89,"costNarrative":"The WLC has increased by £9m. This reflects Homes England’s approach to use existing BIL projects to bridge the gap ahead of the National Housing Delivery Fund (NHDF) launch on 1 April 2026, alongside adjustments for inflation in real terms. This has been enabled by combining NHDF funding into a single, flexible pot, allowing Homes England to move funding between new and existing activity as needed. This flexibility is now reflected in the updated departmental baseline.","benefits":2654.4,"benefitsNarrative":"Whilst our expectation on the level of benefits remains unchanged, the benefits strategy and benefits realisation planning is being finalised. Key benefits are expected to include increased employment floorspace, net additional homes (including breakdown by tenure), and enhanced social and physical infrastructure delivery, with programme-end evaluation expected to monetise the impact of infrastructure outputs. The BIL programme has piloted the collection of data on infrastructure outputs and is now receiving information from delivery partners on outputs such as number of schools, utilities, healthcare facilities, public realm, bridges, rail stations and km of road enabled by BIL.","themes":["Cost & funding","Delivery & schedule","Workforce & capability","Approvals & decisions"],"evidenceExcerpt":"The SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 increased to Green. This uplift is driven by BIL meeting and exceeding its target metrics (67k housing capacity unlocked against a 65.5k target, 500k sqm employment floorspace unlocked against a 200k sqm target, and 78% funding used on brownfield projects against a 72% target). Furthermore, all…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 increased from 31/03/2029 to 31/03/2031. The extension is isolated rather than programme-wide is driven by a single BIL National Project, which has received approval to spend BIL funds in 2029/30 and 2030/31. All other BIL projects remain on track to complete construction and spend by the original end date of 31 March 2029.","narrativeClaimKind":null,"history":[{"id":"DLUHC_0364_2324-Q4","year":2025,"name":"Brownfield, Infrastructure & Land (BIL)","department":"MHCLG","category":"Infrastructure and Construction","description":"Launched in July 2023, the Brownfield Infrastructure and Land (BIL) fund is a £1.5 billion programme designed to regenerate underused land and deliver transport links; boost local areas by transforming disused sites and investing in vital infrastructure, such as GP surgeries, primary schools and access roads; and fund the decontamination of previously used land. BIL is expected to unlock the construction of 65,500 homes and 200,000 sqm of employment floorspace.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER. This is due to‚ Delivery confidence remains Amber, given various risks the programme could face as it transitions into the delivery phase, including potential cost increases and impacts of the Building Safety Act (which may cause delays to project approvals and/or changes to scope). Proactive risk management occurs at project and programme level through risk assessments, regular progress reviews, contingency planning, and escalation where required. BIL is currently on track to achieve its programme targets. The next financial year is expected to be the peak year for expenditure.","startDate":"2023-07-24","endDate":null,"scheduleNarrative":"The project's end-date at 24/25-Q4 is scheduled to be 31/03/2029. This is primarily due to the following factors: There are no changes to the schedule. The final completions for the programme are still planned for the end of the 2028/29 financial year.","fyBaseline":275.58,"fyForecast":242.1,"fyVariance":12.15,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ In March 2025, some BIL spend was reprofiled into the next Financial Year to allow for a key strategic acquisition, resulting in a 12% budget shortfall which will be met in Financial Year 2025/26.","wholeLifeCost":1497.79,"costNarrative":"The project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) is 1,497. This is primarily due to the following factors‚ At Spending Review 21 a package of investment was announced to drive economic growth by investing in new housing-led brownfield, infrastructure, and land projects in England, unlocking construction of 65,500 homes. Budgets profiles have recently been updated as part of the spending review process, with no change to WLC.","benefits":2957.0,"benefitsNarrative":"The project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) is 2957. This is primarily due to the following factors‚ Key monetised benefits are expected to be: increased land value uplift from residential and commercial developments, health benefits from affordable housing and distributional benefits from affordable housing. Further benefits realisation planning will be undertaken in Financial Year 25/26, providing a more accurate projection of the anticipated benefits.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER. This is due to‚ Delivery confidence remains Amber, given various risks the programme could face as it transitions into the delivery phase, including potential cost increases and impacts of the Building Safety Act (which may cause delays to project approvals…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 24/25-Q4 is scheduled to be 31/03/2029. This is primarily due to the following factors: There are no changes to the schedule. The final completions for the programme are still planned for the end of the 2028/29 financial year.","narrativeClaimKind":null},{"id":"DLUHC_0364_2324-Q4","year":2026,"name":"Brownfield, Infrastructure & Land (BIL)","department":"MHCLG","category":"Infrastructure and Construction","description":"Launched in July 2023, the Brownfield Infrastructure and Land (BIL) fund is a £1.5 billion programme designed to regenerate underused land and deliver transport links, boost local areas by transforming disused sites and investing in vital infrastructure, such as GP surgeries, primary schools and access roads and funding the decontamination of previously used land.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 increased to Green. This uplift is driven by BIL meeting and exceeding its target metrics (67k housing capacity unlocked against a 65.5k target, 500k sqm employment floorspace unlocked against a 200k sqm target, and 78% funding used on brownfield projects against a 72% target). Furthermore, all delivery partners have established strong delivery pipelines, providing a clear and credible route to future delivery. Key risks remain, particularly around cost pressures, contractor capacity and the Building Safety Act - particularly for higher-risk and more complex developments, which are generating additional design costs, extending pre-commencement timescales, and increased regulatory burden for developers.","startDate":"2023-07-01","endDate":"2031-03-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 increased from 31/03/2029 to 31/03/2031. The extension is isolated rather than programme-wide is driven by a single BIL National Project, which has received approval to spend BIL funds in 2029/30 and 2030/31. All other BIL projects remain on track to complete construction and spend by the original end date of 31 March 2029.","fyBaseline":400.33,"fyForecast":400.33,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":1506.89,"costNarrative":"The WLC has increased by £9m. This reflects Homes England’s approach to use existing BIL projects to bridge the gap ahead of the National Housing Delivery Fund (NHDF) launch on 1 April 2026, alongside adjustments for inflation in real terms. This has been enabled by combining NHDF funding into a single, flexible pot, allowing Homes England to move funding between new and existing activity as needed. This flexibility is now reflected in the updated departmental baseline.","benefits":2654.4,"benefitsNarrative":"Whilst our expectation on the level of benefits remains unchanged, the benefits strategy and benefits realisation planning is being finalised. Key benefits are expected to include increased employment floorspace, net additional homes (including breakdown by tenure), and enhanced social and physical infrastructure delivery, with programme-end evaluation expected to monetise the impact of infrastructure outputs. The BIL programme has piloted the collection of data on infrastructure outputs and is now receiving information from delivery partners on outputs such as number of schools, utilities, healthcare facilities, public realm, bridges, rail stations and km of road enabled by BIL.","themes":["Cost & funding","Delivery & schedule","Workforce & capability","Approvals & decisions"],"evidenceExcerpt":"The SRO Delivery Confidence Assessment (DCA) rating at 25/26 Q4 increased to Green. This uplift is driven by BIL meeting and exceeding its target metrics (67k housing capacity unlocked against a 65.5k target, 500k sqm employment floorspace unlocked against a 200k sqm target, and 78% funding used on brownfield projects against a 72% target). Furthermore, all…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the programme's end-date at 25/26-Q4 increased from 31/03/2029 to 31/03/2031. The extension is isolated rather than programme-wide is driven by a single BIL National Project, which has received approval to spend BIL funds in 2029/30 and 2030/31. All other BIL projects remain on track to complete construction and spend by the original end date of 31 March 2029.","narrativeClaimKind":null}],"previous":{"id":"DLUHC_0364_2324-Q4","year":2025,"name":"Brownfield, Infrastructure & Land (BIL)","department":"MHCLG","category":"Infrastructure and Construction","description":"Launched in July 2023, the Brownfield Infrastructure and Land (BIL) fund is a £1.5 billion programme designed to regenerate underused land and deliver transport links; boost local areas by transforming disused sites and investing in vital infrastructure, such as GP surgeries, primary schools and access roads; and fund the decontamination of previously used land. BIL is expected to unlock the construction of 65,500 homes and 200,000 sqm of employment floorspace.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER. This is due to‚ Delivery confidence remains Amber, given various risks the programme could face as it transitions into the delivery phase, including potential cost increases and impacts of the Building Safety Act (which may cause delays to project approvals and/or changes to scope). Proactive risk management occurs at project and programme level through risk assessments, regular progress reviews, contingency planning, and escalation where required. BIL is currently on track to achieve its programme targets. The next financial year is expected to be the peak year for expenditure.","startDate":"2023-07-24","endDate":null,"scheduleNarrative":"The project's end-date at 24/25-Q4 is scheduled to be 31/03/2029. This is primarily due to the following factors: There are no changes to the schedule. The final completions for the programme are still planned for the end of the 2028/29 financial year.","fyBaseline":275.58,"fyForecast":242.1,"fyVariance":12.15,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ In March 2025, some BIL spend was reprofiled into the next Financial Year to allow for a key strategic acquisition, resulting in a 12% budget shortfall which will be met in Financial Year 2025/26.","wholeLifeCost":1497.79,"costNarrative":"The project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) is 1,497. This is primarily due to the following factors‚ At Spending Review 21 a package of investment was announced to drive economic growth by investing in new housing-led brownfield, infrastructure, and land projects in England, unlocking construction of 65,500 homes. Budgets profiles have recently been updated as part of the spending review process, with no change to WLC.","benefits":2957.0,"benefitsNarrative":"The project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) is 2957. This is primarily due to the following factors‚ Key monetised benefits are expected to be: increased land value uplift from residential and commercial developments, health benefits from affordable housing and distributional benefits from affordable housing. Further benefits realisation planning will be undertaken in Financial Year 25/26, providing a more accurate projection of the anticipated benefits.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER. This is due to‚ Delivery confidence remains Amber, given various risks the programme could face as it transitions into the delivery phase, including potential cost increases and impacts of the Building Safety Act (which may cause delays to project approvals…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 24/25-Q4 is scheduled to be 31/03/2029. This is primarily due to the following factors: There are no changes to the schedule. The final completions for the programme are still planned for the end of the 2028/29 financial year.","narrativeClaimKind":null},"ratingDelta":-1,"transition":"Improved","endDateDeltaDays":null,"attentionScore":0,"attentionReasons":[]},{"id":"DFE_0272_2324-Q2","year":2026,"name":"Early Years Childcare Reform Programme","department":"DFE","category":"Government Transformation and Service Delivery","description":"The Early Years Childcare Reform Programme was launched to expand funded childcare for working parents and give children the best possible start in life, while supporting parents to enter or increase hours in work. The programme was introduced in response to rising childcare costs and the need to improve access to affordable, high‑quality early education across England. The programme significantly increased the number of funded childcare hours available, extending the 30‑hour entitlement to younger children from nine months old. This required close work with local authorities, childcare providers and the sector to ensure there were enough childcare places, a strong workforce, and reliable digital systems to support families to access their entitlements. The programme’s aim was to deliver this expansion safely and sustainably, ensuring childcare was available where families need it, that funding reached providers on time, and that the system continued to operate smoothly as demand increased. By the completion of the programme, uptake had exceeded expectations, national childcare capacity was sufficient, and the programme successfully transitioned into ongoing business‑as‑usual operations to support long‑term delivery of childcare entitlements","ipaDca":"Green","sroDca":null,"deliveryConfidence":"Green","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 2024/25 Q4, the Delivery Confidence Assessment (DCA) at 2025/26 Q4 increased to Green. This reflects strong and sustained progress across the year in delivering the expanded childcare entitlements. Early in the year, delivery confidence was cautious due to workforce and place capacity pressures in some areas. As the year progressed, uptake exceeded expectations, workforce numbers grew steadily, and local authority readiness improved significantly. By September, all local authorities were reporting sufficient childcare places, with no national shortfalls and high code‑validation rates showing demand was being met. Digital systems have operated reliably, parents have been able to access the hours they are entitled to, and no widespread complaints have been reported. The programme successfully met its final milestones and received a Green rating at its final independent assurance review, enabling a confident transition into business‑as‑usual operations","startDate":"2023-03-16","endDate":null,"scheduleNarrative":"Compared to financial year 2024/25 Q4, the project’s end‑date at 2025/26 Q4 remained the same. This is because the programme delivered all planned milestones to schedule across the year. While early delivery phases required careful management of workforce and childcare capacity in some areas, these risks were anticipated and addressed without impacting the overall timetable. The September 2025 expansion milestone was achieved on time, with strong uptake, sufficient childcare places nationally, and stable digital systems. The programme successfully completed its final delivery activities as planned, received a Green rating at its final independent assurance review, and is proceeding to formal closure and transition into business‑as‑usual operations in line with the original schedule. Alongside continued BAU delivery, management of the Programme's benefits and our Programme evaluation continue as planned, with the evaluation's final report due in late 2027.","fyBaseline":4021.7,"fyForecast":4021.7,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%","wholeLifeCost":16207.65,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) increased to £16,983 This reflects updated funding assumptions in relation to higher expected take‑up of funded hours, increased provider funding rates to reflect wage inflation, and refinements to delivery cost modelling as the programme moves to full rollout","benefits":null,"benefitsNarrative":"Compared to our return for Q4 of financial year 2024/25, the departmentally-agreed benefits at Q4 of 2025/26 reflect the most recently agreed range of benefits rather than a fixed or final estimate. The benefits figures reported at 2025/26 Q4 reflect the most recent programme level economic appraisal of the childcare reforms, covering impacts from spending over FY23/24 to FY27/28. These estimates are expressed on an economic basis, adjusted to reflect changes over time (including inflation and discounting), and are therefore not directly comparable with the financial (cash) costs of the programme, which are reported separately. The appraisal estimates monetised benefits using the best available evidence from research, administrative data and economic modelling. However, the assessment relies in part on proxy measures and therefore carries a high degree of uncertainty. The appraisal estimates £8bn of economic benefits from impacts on maternal labour market participation (employment rates, hours worked and reduced labour market detachment), maternal subjective wellbeing, and child development associated with formal childcare attendance. There is a further £8bn of economic transfer to households already using childcare that will boost their disposable income. The most recent assessment suggests that the programme delivers around £1 of monetised economic benefit for every £1 of economic cost. This reflects an updated appraisal baseline rather than a fixed or final estimate and should be interpreted as an indicative position rather than a precise measure of value for money. Small changes in underlying assumptions including uptake, labour supply responses and deadweight can have a material effect on the benefit–cost ratio, and the estimated ratio could increase or decrease as further evidence becomes available, in particular following the final phase of the rollout of the 30hours expansion from September 2025. In addition to the monetised impacts, there are important benefits that are not currently quantified, including how funding rates for 9mo-2 yo children supports provider delivery and quality, across the sector, and benefits child development and outcomes as has been recognised by successive governments . Further, the benefits of increased formal childcare use influencing the home learning environment are not captured. These omissions mean that the appraisal does not capture the full range of potential benefits to both labour market participation which is itself shaped through local childcare markets, and child development. The department recognises that the current benefit estimates are uncertain and subject to ongoing refinement. Ongoing evaluation activity, including analytical work by the Institute for Fiscal Studies, will provide further evidence on behavioural impacts, deadweight and longer-term outcomes, helping to inform future assessments of programme benefits and overall value for money.","themes":["Delivery & schedule","Cost & funding","Workforce & capability","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 2024/25 Q4, the Delivery Confidence Assessment (DCA) at 2025/26 Q4 increased to Green. This reflects strong and sustained progress across the year in delivering the expanded childcare entitlements. Early in the year, delivery confidence was cautious due to workforce and place capacity pressures in some areas. As the year…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 2024/25 Q4, the project’s end‑date at 2025/26 Q4 remained the same. This is because the programme delivered all planned milestones to schedule across the year. While early delivery phases required careful management of workforce and childcare capacity in some areas, these risks were anticipated and addressed without impacting the overall timetable. The September 2025 expansion milestone was achieved on time, with strong uptake, sufficient childcare places nationally, and stable digital systems. The programme successfully completed its final delivery activities as planned, received a Green rating at its final independent assurance review, and is proceeding to formal closure and transition into business‑as‑usual operations in line with the original schedule. Alongside continued BAU delivery, management of the Programme's benefits and our Programme evaluation continue as planned, with the evaluation's final report due in late 2027.","narrativeClaimKind":null,"history":[{"id":"DFE_0272_2324-Q2","year":2024,"name":"Early Years Childcare Reform Programme","department":"DFE","category":"Government Transformation and Service Delivery","description":"The Programme comprises of four overarching projects; Families, Providers, Local Authorities and Wraparound, led by SCS SROs and supported by a dedicated Project Manager and PMO resource who collaborate with the central PMO. The aim of the programme is to increase parental employment and progression of earnings by increasing childcare access for eligible working parents. We have had the programme business case agreed and signed off by InvestCo.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. An IPA Gate 0 review in Mar 24 gave the programme an amber rating. This was broken down as green for the first stage of roll out (Apr 24), amber for Sep 24 expansion and red for the Sep 25 expansion. The review recognised the hard work of staff to achieve several challenging milestones. Relationship management with local authorities and stakeholders internally and externally was praised. There were also some clear recommendations on the resource and capability needed in key aspects of the programme including the PMO, Insights Unit and Communications. We continue the work to strengthen these areas with focus on skilled resources and refreshing the governance. Our delivery has remained on track since the first 'live' milestone in Apr 24. We have continued to progress key activities across the programme including system development, operational infrastructure, and legislation to ensure the sector is ready for the expansion.","startDate":"2023-03-16","endDate":"2028-12-01","scheduleNarrative":"The project's end-date at 23/24-Q4 is 2028-12-01. This is primarily due to the following factors. The programme end data is Dec 2028 this is primarily due to the plan to transform reforms to childcare for parents, children, the economy and women. By 2027-28, this Government will expect to be spending in excess of 8bn every year on free hours and early education, helping working families with their childcare costs. This represents the single biggest investment in childcare in England ever. The programme is on track to complete by its stated end date.","fyBaseline":342.8,"fyForecast":342.8,"fyVariance":0.0,"varianceNarrative":"The budget variance is inferior or equal to 5%.","wholeLifeCost":15135.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 23/24-Q4 is 15135m. This is primarily due to the following factors. The whole-life programme cost is 15.1bn (which extends to financial year 2027-28) including both the delivery of the expansion (565.2m) and the additional entitlement funding (14.6bn). This overall funding envelope and specific project budgets are based on a pre-announcement estimation of likely delivery costs. As the programme matures, planning and policy is developed, and individual business cases prepared, more accurate budget needs and financial year profiles will be agreed.","benefits":0.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 0m. The project's departmental-agreed monetised benefits at Q4 FY23/24 is 0m. Benefits are currently being defined.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Workforce & capability"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. An IPA Gate 0 review in Mar 24 gave the programme an amber rating. This was broken down as green for the first stage of roll out (Apr 24), amber for Sep 24 expansion and red for the Sep 25 expansion. The review…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 23/24-Q4 is 2028-12-01. This is primarily due to the following factors. The programme end data is Dec 2028 this is primarily due to the plan to transform reforms to childcare for parents, children, the economy and women. By 2027-28, this Government will expect to be spending in excess of 8bn every year on free hours and early education, helping working families with their childcare costs. This represents the single biggest investment in childcare in England ever. The programme is on track to complete by its stated end date.","narrativeClaimKind":null},{"id":"DFE_0272_2324-Q2","year":2025,"name":"Early Years Childcare Reform Programme","department":"DfE","category":"Government Transformation and Service Delivery","description":"The aim of the Early Years Childcare Reform Programme is to increase parental employment and progression of earnings by increasing childcare access for eligible working parents. It comprises four overarching projects: Families, Providers, Local Authorities and Wraparound.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ We successfully delivered key milestones in April 2024 and September 2024 and refocussed the programme onto the September 2025 deliverables (up to 30 hours of childcare per week for children over nine-months old, for eligible working parents). The programme continued, through FY24/25, to assess confidence for September 2025 delivery at a national and local level, and to support growth in workforce and places needed to meet parental demand. The scale of the challenge remains significant, and we will continue to deliver against a backdrop of uncertainty. As we approach September 2025 the work on the transition to business-as-usual continues at pace with the PMO directing the strategy around what this looks like.","startDate":"2023-03-16","endDate":"2028-12-01","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 01/12/2028. This is primarily due to the following factors‚ This is unchanged from last year.","fyBaseline":2200.0,"fyForecast":2200.0,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":15135.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 15135. This is primarily due to the following factors‚ This is unchanged from last year.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ This is unchanged from last year. However, the programme will deliver monetised benefits. These will be confirmed during FY2526 as evidence of demand from parents becomes available to refine estimates.","themes":["Cost & funding","Delivery & schedule","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ We successfully delivered key milestones in April 2024 and September 2024 and refocussed the programme onto the September 2025 deliverables (up to 30 hours of…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 01/12/2028. This is primarily due to the following factors‚ This is unchanged from last year.","narrativeClaimKind":null},{"id":"DFE_0272_2324-Q2","year":2026,"name":"Early Years Childcare Reform Programme","department":"DFE","category":"Government Transformation and Service Delivery","description":"The Early Years Childcare Reform Programme was launched to expand funded childcare for working parents and give children the best possible start in life, while supporting parents to enter or increase hours in work. The programme was introduced in response to rising childcare costs and the need to improve access to affordable, high‑quality early education across England. The programme significantly increased the number of funded childcare hours available, extending the 30‑hour entitlement to younger children from nine months old. This required close work with local authorities, childcare providers and the sector to ensure there were enough childcare places, a strong workforce, and reliable digital systems to support families to access their entitlements. The programme’s aim was to deliver this expansion safely and sustainably, ensuring childcare was available where families need it, that funding reached providers on time, and that the system continued to operate smoothly as demand increased. By the completion of the programme, uptake had exceeded expectations, national childcare capacity was sufficient, and the programme successfully transitioned into ongoing business‑as‑usual operations to support long‑term delivery of childcare entitlements","ipaDca":"Green","sroDca":null,"deliveryConfidence":"Green","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 2024/25 Q4, the Delivery Confidence Assessment (DCA) at 2025/26 Q4 increased to Green. This reflects strong and sustained progress across the year in delivering the expanded childcare entitlements. Early in the year, delivery confidence was cautious due to workforce and place capacity pressures in some areas. As the year progressed, uptake exceeded expectations, workforce numbers grew steadily, and local authority readiness improved significantly. By September, all local authorities were reporting sufficient childcare places, with no national shortfalls and high code‑validation rates showing demand was being met. Digital systems have operated reliably, parents have been able to access the hours they are entitled to, and no widespread complaints have been reported. The programme successfully met its final milestones and received a Green rating at its final independent assurance review, enabling a confident transition into business‑as‑usual operations","startDate":"2023-03-16","endDate":null,"scheduleNarrative":"Compared to financial year 2024/25 Q4, the project’s end‑date at 2025/26 Q4 remained the same. This is because the programme delivered all planned milestones to schedule across the year. While early delivery phases required careful management of workforce and childcare capacity in some areas, these risks were anticipated and addressed without impacting the overall timetable. The September 2025 expansion milestone was achieved on time, with strong uptake, sufficient childcare places nationally, and stable digital systems. The programme successfully completed its final delivery activities as planned, received a Green rating at its final independent assurance review, and is proceeding to formal closure and transition into business‑as‑usual operations in line with the original schedule. Alongside continued BAU delivery, management of the Programme's benefits and our Programme evaluation continue as planned, with the evaluation's final report due in late 2027.","fyBaseline":4021.7,"fyForecast":4021.7,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%","wholeLifeCost":16207.65,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) increased to £16,983 This reflects updated funding assumptions in relation to higher expected take‑up of funded hours, increased provider funding rates to reflect wage inflation, and refinements to delivery cost modelling as the programme moves to full rollout","benefits":null,"benefitsNarrative":"Compared to our return for Q4 of financial year 2024/25, the departmentally-agreed benefits at Q4 of 2025/26 reflect the most recently agreed range of benefits rather than a fixed or final estimate. The benefits figures reported at 2025/26 Q4 reflect the most recent programme level economic appraisal of the childcare reforms, covering impacts from spending over FY23/24 to FY27/28. These estimates are expressed on an economic basis, adjusted to reflect changes over time (including inflation and discounting), and are therefore not directly comparable with the financial (cash) costs of the programme, which are reported separately. The appraisal estimates monetised benefits using the best available evidence from research, administrative data and economic modelling. However, the assessment relies in part on proxy measures and therefore carries a high degree of uncertainty. The appraisal estimates £8bn of economic benefits from impacts on maternal labour market participation (employment rates, hours worked and reduced labour market detachment), maternal subjective wellbeing, and child development associated with formal childcare attendance. There is a further £8bn of economic transfer to households already using childcare that will boost their disposable income. The most recent assessment suggests that the programme delivers around £1 of monetised economic benefit for every £1 of economic cost. This reflects an updated appraisal baseline rather than a fixed or final estimate and should be interpreted as an indicative position rather than a precise measure of value for money. Small changes in underlying assumptions including uptake, labour supply responses and deadweight can have a material effect on the benefit–cost ratio, and the estimated ratio could increase or decrease as further evidence becomes available, in particular following the final phase of the rollout of the 30hours expansion from September 2025. In addition to the monetised impacts, there are important benefits that are not currently quantified, including how funding rates for 9mo-2 yo children supports provider delivery and quality, across the sector, and benefits child development and outcomes as has been recognised by successive governments . Further, the benefits of increased formal childcare use influencing the home learning environment are not captured. These omissions mean that the appraisal does not capture the full range of potential benefits to both labour market participation which is itself shaped through local childcare markets, and child development. The department recognises that the current benefit estimates are uncertain and subject to ongoing refinement. Ongoing evaluation activity, including analytical work by the Institute for Fiscal Studies, will provide further evidence on behavioural impacts, deadweight and longer-term outcomes, helping to inform future assessments of programme benefits and overall value for money.","themes":["Delivery & schedule","Cost & funding","Workforce & capability","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 2024/25 Q4, the Delivery Confidence Assessment (DCA) at 2025/26 Q4 increased to Green. This reflects strong and sustained progress across the year in delivering the expanded childcare entitlements. Early in the year, delivery confidence was cautious due to workforce and place capacity pressures in some areas. As the year…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 2024/25 Q4, the project’s end‑date at 2025/26 Q4 remained the same. This is because the programme delivered all planned milestones to schedule across the year. While early delivery phases required careful management of workforce and childcare capacity in some areas, these risks were anticipated and addressed without impacting the overall timetable. The September 2025 expansion milestone was achieved on time, with strong uptake, sufficient childcare places nationally, and stable digital systems. The programme successfully completed its final delivery activities as planned, received a Green rating at its final independent assurance review, and is proceeding to formal closure and transition into business‑as‑usual operations in line with the original schedule. Alongside continued BAU delivery, management of the Programme's benefits and our Programme evaluation continue as planned, with the evaluation's final report due in late 2027.","narrativeClaimKind":null}],"previous":{"id":"DFE_0272_2324-Q2","year":2025,"name":"Early Years Childcare Reform Programme","department":"DfE","category":"Government Transformation and Service Delivery","description":"The aim of the Early Years Childcare Reform Programme is to increase parental employment and progression of earnings by increasing childcare access for eligible working parents. It comprises four overarching projects: Families, Providers, Local Authorities and Wraparound.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ We successfully delivered key milestones in April 2024 and September 2024 and refocussed the programme onto the September 2025 deliverables (up to 30 hours of childcare per week for children over nine-months old, for eligible working parents). The programme continued, through FY24/25, to assess confidence for September 2025 delivery at a national and local level, and to support growth in workforce and places needed to meet parental demand. The scale of the challenge remains significant, and we will continue to deliver against a backdrop of uncertainty. As we approach September 2025 the work on the transition to business-as-usual continues at pace with the PMO directing the strategy around what this looks like.","startDate":"2023-03-16","endDate":"2028-12-01","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 01/12/2028. This is primarily due to the following factors‚ This is unchanged from last year.","fyBaseline":2200.0,"fyForecast":2200.0,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":15135.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 15135. This is primarily due to the following factors‚ This is unchanged from last year.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ This is unchanged from last year. However, the programme will deliver monetised benefits. These will be confirmed during FY2526 as evidence of demand from parents becomes available to refine estimates.","themes":["Cost & funding","Delivery & schedule","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ We successfully delivered key milestones in April 2024 and September 2024 and refocussed the programme onto the September 2025 deliverables (up to 30 hours of…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 01/12/2028. This is primarily due to the following factors‚ This is unchanged from last year.","narrativeClaimKind":null},"ratingDelta":-1,"transition":"Improved","endDateDeltaDays":null,"attentionScore":0,"attentionReasons":[]},{"id":"DHSC_0252_2324-Q1","year":2026,"name":"FEDERATED DATA PLATFORM","department":"DHSC","category":"Government Transformation and Service Delivery","description":"The NHS Federated Data Platform (FDP) is a national initiative aimed at enhancing the use of data across the NHS to support safer, more efficient care. By securely connecting disparate NHS data systems, the FDP facilitates streamlined access and utilisation of information, reducing delays and minimising duplication.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Following the Green rating received in Q4 of the financial year 24/25, the NISTA/SRO Delivery Confidence Assessment (DCA) for Q4 of 25/26 has similarly achieved a Green status. The programme’s has successfully attained its targets, benefits realisation is accelerating, with ten products now generally available and regional teams onboarding new sites. Preparations for the reporting tool deployment are progressing ahead of plan, and the development of partner standards is advancing robustly. The programme has made significant strides towards achieving 2025/26 milestones. Enhanced roles, comprehensive oversight, and proactive risk management have elevated governance standards. By April 2026, 129 acute trusts were actively utilising FDP products, with demand continuing to rise.","startDate":"2022-04-01","endDate":"2032-03-31","scheduleNarrative":"The programme is still progressing as planned and is expected to meet the deadlines established in its business case.","fyBaseline":126.0,"fyForecast":126.89,"fyVariance":0.71,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":1084.31,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 has Increased. This increase reflects the increased delivery at scale, particularly in FYs 2025/26 and 2026/27. For 2025/26 the increased expenditure was financially managed and absorbed within overall budgets. For 2026/27 the accelerated delivery schedule has been accommodated within the overall budget envelope. Despite this increase, the Programme remains within the departmental baseline.","benefits":808.28,"benefitsNarrative":"Compared to financial year 2024/25 Q4, the programme's departmentally agreed Forecast benefits at 2025/26 Q4 decreased . This is primarily due to ongoing refinements to estimates reflecting updates to the product roadmap and rollout plans, alongside the adoption of a more developed forecasting approach based on improved data, more detailed delivery assumptions, and a stronger understanding of product performance, usage, and adoption. We expect programme lifetime benefits to continue to grow as more products and platform services are developed, rolled out, and adopted, and as their benefits are realised across the system.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Approvals & decisions"],"evidenceExcerpt":"Following the Green rating received in Q4 of the financial year 24/25, the NISTA/SRO Delivery Confidence Assessment (DCA) for Q4 of 25/26 has similarly achieved a Green status. The programme’s has successfully attained its targets, benefits realisation is accelerating, with ten products now generally available and regional teams onboarding new sites.…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The programme is still progressing as planned and is expected to meet the deadlines established in its business case.","narrativeClaimKind":null,"history":[{"id":"DHSC_0252_2324-Q1","year":2024,"name":"Federated Data Platform","department":"DHSC","category":"Government Transformation and Service Delivery","description":"The NHS Federated Data Platform (FDP) is software that will sit across NHS trusts and integrated care systems enabling NHS organisations to bring together operational data - currently stored in separate systems - to support staff to access the information they need in one safe and secure environment.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. NHS England is pleased with progress made to date with the Federated Data Platform Programme. To date, the programme has been delivered to time and within budget. We look forward to the benefits that will be realised for patients through adoption of the platform over the coming years, and believe that work to date has provided solid foundation for the programme. _x000D_ _x000D_ The benefits delivered through the pilot programmes are significant and demonstrate the true potential of the FDP and the impact that this technology will have for patients and NHS staff.","startDate":"2022-04-01","endDate":"2032-03-31","scheduleNarrative":"The project's end-date at 23/24-Q4 is 2032-03-31. This is primarily due to the following factors. The FDP Programme is currently delivering to plan. _x000D_ A full business case was approved in November 2023. _x000D_ The Federated Data Platform and Associated Services (FDP-AS) contract was awarded 22 November. The Privacy Enhancing Technology (PET) contract was awarded on 22 November. The first users were onboarded to the platform on 21 March for two National products. The programme is focused on preparations for local organisations to join the FDP, and transition of further products.","fyBaseline":122.3,"fyForecast":100.9,"fyVariance":-17.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The FDP programme receieved FBC approval in November 2023, therefore anticipated 2023/24 costs and benefits were reduced. The Variance is due tounderspend on both programme team and operational costs resulting from delayed FBC approval resulting in a delay to programme delivery plans and associated contractual costs.","wholeLifeCost":1042.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 23/24-Q4 is 1042m. This is primarily due to the following factors. The OBC recommended to procure a central Software as a Service (SaaS) platform with ICS linkages. The whole life budget includes licences and cloud costs for the software and support. Costs for internal staffing to reflect work that would be undertaken in developing and deploying the platform, its use case implementation, and delivery that would happen at greater pace. The Federated Data Platform will dock into existing ICS infrastructure where possible, according to the different integration patterns (which are based on system maturity and capability).","benefits":777.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 777m. The benefits figure outlined is an economic estimate of the total benefits the FDP programme will achieve over the life time of the project; these are cash and non-cash releasing to the NHS as well as wider societal benefits. The FDP programme will for example deliver the following benefits:_x000D_ . An increase in the utilisation of operating theatres, meaning more procedures can be carried out each year and patients should have a shorter waiting time for their procedures_x000D_ . A reduction in unnecessary delay days for patients awaiting discharge from hospital_x000D_ . A reduction in the costs of reporting and IT for Trusts and ICSs","themes":["Cost & funding","Delivery & schedule","Technical & integration","Approvals & decisions"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. NHS England is pleased with progress made to date with the Federated Data Platform Programme. To date, the programme has been delivered to time and within budget. We look forward to the benefits that will be…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 23/24-Q4 is 2032-03-31. This is primarily due to the following factors. The FDP Programme is currently delivering to plan. _x000D_ A full business case was approved in November 2023. _x000D_ The Federated Data Platform and Associated Services (FDP-AS) contract was awarded 22 November. The Privacy Enhancing Technology (PET) contract was awarded on 22 November. The first users were onboarded to the platform on 21 March for two National products. The programme is focused on preparations for local organisations to join the FDP, and transition of further products.","narrativeClaimKind":null},{"id":"DHSC_0252_2324-Q1","year":2025,"name":"FEDERATED DATA PLATFORM","department":"DHSC","category":"Government Transformation and Service Delivery","description":"The NHS Federated Data Platform (FDP) is a national programme designed to improve how the NHS uses data to deliver better, safer, and more efficient care. Currently, NHS data is stored in many different systems that don’t easily connect, which can lead to delays, duplication, and extra work for staff. The FDP is a secure digital platform that links these systems together, allowing data to be accessed and used more effectively.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors‚ Strengthened Programme Governance: Clearer roles, responsibilities, and decision-making structures have been established, improving oversight and accountability across delivery partners; - Matured Delivery Planning: The programme now has a well-defined roadmap with realistic timelines, phased implementation, and prioritised use cases aligned to NHS strategic goals; - Achievement of Programme Delivery targets: As of 31 March 2025, the programme had 72 acute trusts live with at least one product delivering benefits platform, comfortably meeting the year end target. The programme continues to generate demand and is above target for 2025/26 demand; and - Alignment with National Priorities: the programme is closely aligned with key NHS and government strategies, which has helped secure continued support and investment.","startDate":"2022-04-01","endDate":"2032-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2032. This is primarily due to the following factors‚ The programme remains on track to deliver to the timeframes set out in it’s business case.","fyBaseline":122.0,"fyForecast":101.0,"fyVariance":17.21,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ There has been an in-year variance of in excess of 5% due to a lower number of products being taken by Trusts, than was planned in the budget, A range of operational and contextual factors contributed to this outcome. Work is ongoing to review engagement approaches and identify opportunities to support improved uptake and delivery in future periods.","wholeLifeCost":1042.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 1042. This is primarily due to the following factors‚ The underspend in 2024/25 does not require a change in the project’s agreed Whole Life Cost of £1042m. This position reflects the expectation that current variances are timing-related rather than indicative of a fundamental shift in overall cost requirements. The project remains on track to deliver its intended outcomes within the approved financial envelope, and ongoing monitoring will ensure that any future adjustments are identified and managed appropriately.","benefits":777.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 777. This is primarily due to the following factors‚ The FDP is driving an innovating, benefits led approach to delivery. Benefits are reported regularly and transparently – being published on the NHS website on a dedicated Uptake and Benefits page. The FDP is delivering significant, measurable benefits, with rapid uptake. The outcomes align strongly with the business case and forecast lifetime benefits exceed the departmental baseline.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors‚ Strengthened Programme Governance: Clearer roles, responsibilities, and decision-making structures have been established, improving oversight and…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2032. This is primarily due to the following factors‚ The programme remains on track to deliver to the timeframes set out in it’s business case.","narrativeClaimKind":null},{"id":"DHSC_0252_2324-Q1","year":2026,"name":"FEDERATED DATA PLATFORM","department":"DHSC","category":"Government Transformation and Service Delivery","description":"The NHS Federated Data Platform (FDP) is a national initiative aimed at enhancing the use of data across the NHS to support safer, more efficient care. By securely connecting disparate NHS data systems, the FDP facilitates streamlined access and utilisation of information, reducing delays and minimising duplication.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Following the Green rating received in Q4 of the financial year 24/25, the NISTA/SRO Delivery Confidence Assessment (DCA) for Q4 of 25/26 has similarly achieved a Green status. The programme’s has successfully attained its targets, benefits realisation is accelerating, with ten products now generally available and regional teams onboarding new sites. Preparations for the reporting tool deployment are progressing ahead of plan, and the development of partner standards is advancing robustly. The programme has made significant strides towards achieving 2025/26 milestones. Enhanced roles, comprehensive oversight, and proactive risk management have elevated governance standards. By April 2026, 129 acute trusts were actively utilising FDP products, with demand continuing to rise.","startDate":"2022-04-01","endDate":"2032-03-31","scheduleNarrative":"The programme is still progressing as planned and is expected to meet the deadlines established in its business case.","fyBaseline":126.0,"fyForecast":126.89,"fyVariance":0.71,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":1084.31,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 has Increased. This increase reflects the increased delivery at scale, particularly in FYs 2025/26 and 2026/27. For 2025/26 the increased expenditure was financially managed and absorbed within overall budgets. For 2026/27 the accelerated delivery schedule has been accommodated within the overall budget envelope. Despite this increase, the Programme remains within the departmental baseline.","benefits":808.28,"benefitsNarrative":"Compared to financial year 2024/25 Q4, the programme's departmentally agreed Forecast benefits at 2025/26 Q4 decreased . This is primarily due to ongoing refinements to estimates reflecting updates to the product roadmap and rollout plans, alongside the adoption of a more developed forecasting approach based on improved data, more detailed delivery assumptions, and a stronger understanding of product performance, usage, and adoption. We expect programme lifetime benefits to continue to grow as more products and platform services are developed, rolled out, and adopted, and as their benefits are realised across the system.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Approvals & decisions"],"evidenceExcerpt":"Following the Green rating received in Q4 of the financial year 24/25, the NISTA/SRO Delivery Confidence Assessment (DCA) for Q4 of 25/26 has similarly achieved a Green status. The programme’s has successfully attained its targets, benefits realisation is accelerating, with ten products now generally available and regional teams onboarding new sites.…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The programme is still progressing as planned and is expected to meet the deadlines established in its business case.","narrativeClaimKind":null}],"previous":{"id":"DHSC_0252_2324-Q1","year":2025,"name":"FEDERATED DATA PLATFORM","department":"DHSC","category":"Government Transformation and Service Delivery","description":"The NHS Federated Data Platform (FDP) is a national programme designed to improve how the NHS uses data to deliver better, safer, and more efficient care. Currently, NHS data is stored in many different systems that don’t easily connect, which can lead to delays, duplication, and extra work for staff. The FDP is a secure digital platform that links these systems together, allowing data to be accessed and used more effectively.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors‚ Strengthened Programme Governance: Clearer roles, responsibilities, and decision-making structures have been established, improving oversight and accountability across delivery partners; - Matured Delivery Planning: The programme now has a well-defined roadmap with realistic timelines, phased implementation, and prioritised use cases aligned to NHS strategic goals; - Achievement of Programme Delivery targets: As of 31 March 2025, the programme had 72 acute trusts live with at least one product delivering benefits platform, comfortably meeting the year end target. The programme continues to generate demand and is above target for 2025/26 demand; and - Alignment with National Priorities: the programme is closely aligned with key NHS and government strategies, which has helped secure continued support and investment.","startDate":"2022-04-01","endDate":"2032-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2032. This is primarily due to the following factors‚ The programme remains on track to deliver to the timeframes set out in it’s business case.","fyBaseline":122.0,"fyForecast":101.0,"fyVariance":17.21,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ There has been an in-year variance of in excess of 5% due to a lower number of products being taken by Trusts, than was planned in the budget, A range of operational and contextual factors contributed to this outcome. Work is ongoing to review engagement approaches and identify opportunities to support improved uptake and delivery in future periods.","wholeLifeCost":1042.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 1042. This is primarily due to the following factors‚ The underspend in 2024/25 does not require a change in the project’s agreed Whole Life Cost of £1042m. This position reflects the expectation that current variances are timing-related rather than indicative of a fundamental shift in overall cost requirements. The project remains on track to deliver its intended outcomes within the approved financial envelope, and ongoing monitoring will ensure that any future adjustments are identified and managed appropriately.","benefits":777.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 777. This is primarily due to the following factors‚ The FDP is driving an innovating, benefits led approach to delivery. Benefits are reported regularly and transparently – being published on the NHS website on a dedicated Uptake and Benefits page. The FDP is delivering significant, measurable benefits, with rapid uptake. The outcomes align strongly with the business case and forecast lifetime benefits exceed the departmental baseline.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors‚ Strengthened Programme Governance: Clearer roles, responsibilities, and decision-making structures have been established, improving oversight and…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2032. This is primarily due to the following factors‚ The programme remains on track to deliver to the timeframes set out in it’s business case.","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":0,"attentionScore":0,"attentionReasons":[]},{"id":"DEFRA_0236_2324-Q1","year":2026,"name":"FLOOD AND COASTAL EROSION RISK MANAGEMENT","department":"DEFRA","category":"Infrastructure and Construction","description":"From 1 April 2021, Defra announced a new £5.2bn 6-year investment programme for flood & coastal erosion risk management- investing in 2,000 flood defence schemes to better protect 336,000 properties by 2027. Due to the impact of the covid 19 pandemic and a significant spike in inflation this was revised down to 200,000. The new government reduced to a 5 year programme to introduce new funding policy sooner which equated to 140,272 over 5 years with a particular focus on a £4.2bn 2 year programme with a target of 52,000.","ipaDca":"Green","sroDca":null,"deliveryConfidence":"Green","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained amber. This is primarily due to concerns around work being conducted to manage the transition from the current programme to the next programme commencing on 1 April 2026","startDate":"2020-04-01","endDate":"2026-03-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same","fyBaseline":1075.16,"fyForecast":1055.79,"fyVariance":1.8,"varianceNarrative":"The budget variance is less than or equal to 5%.\"","wholeLifeCost":4835.25,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) remained at 4,613.000m","benefits":12042.59,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 21,888.000m","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained amber. This is primarily due to concerns around work being conducted to manage the transition from the current programme to the next programme commencing on 1 April 2026 Compared to financial year 24/25-Q4, the project's…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same","narrativeClaimKind":null,"history":[{"id":"DEFRA_0236_2324-Q1","year":2024,"name":"Flood and Coastal Erosion Risk Management 6-year Capital Programme","department":"DEFRA","category":"Infrastructure and Construction","description":"A comprehensive flood and coastal resilience investment programme to upgrade and revitalise England's flood defence infrastructure. The programme aims to reduce the harm and damage caused by flooding, protect peoples' lives and minimise disruption to livelihoods. This is a strategic programme comprising several thousand individual flood and coastal defence projects delivered by the Environment Agency and other Risk Management Authorities.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. The investment programme had a challenging start arising from the combined impact of COVID-19, a shortage of skills in the infrastructure sector, and higher than forecast inflation and increased material costs. As a result, the Environment Agency and Defra have produced a revised business case and spending profile that takes into account these impacts, while still maintaining focus on better protecting properties from flooding and coastal erosion. The amber rating reflects ongoing risks associated with: securing partnership funding from other public and private organisations; reliance on other risk management authorities to deliver 40% of the programme; and the impact of revised accounting rules that require approval from HM Treasury to reclassify a portion of existing CDEL funding as RDEL. The Environment Agency has been improving other risk management authority access to its frameworks; simplifying business cases and assurance; and improving access to information and training and guidance.","startDate":"2020-04-01","endDate":"2027-03-31","scheduleNarrative":"The project's end-date at 23/24-Q4 is 2027-03-31. This is primarily due to the following factors. Defra and HM Treasury have agreed a 6-year funding settlement for the Flood and Coastal Erosion Risk Management Investment Programme between April 2021 to March 2027.","fyBaseline":854.0,"fyForecast":854.0,"fyVariance":0.0,"varianceNarrative":"The budget variance is inferior or equal to 5%.","wholeLifeCost":5664.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 23/24-Q4 is 5664m. This is primarily due to the following factors. The programme has been impacted by capacity and capability issues and increased cost of delivery, primarily through high levels of inflation. This slowed down delivery resulting in lower expenditure than originally planned in the early years of the programme. A revised programme business case has been agreed with Defra with a revised spending profile, but this does not alter the total funding allocation to the programme.","benefits":37292.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 23/24-Q4 is 37292m. Benefits of flood and coastal risk management projects are based on the reducing the damages caused by flooding and erosion. They are informed by physical models of flood and erosion risks that assess impacts under a range of scenarios, factoring in climate change. The monetised values are based on data on the economic costs of flooding.","themes":["Cost & funding","Workforce & capability","Approvals & decisions","Delivery & schedule"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 23/24-Q4 is Amber. This is primarily due to the following factors. The investment programme had a challenging start arising from the combined impact of COVID-19, a shortage of skills in the infrastructure sector, and higher than forecast inflation and increased material costs.…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 23/24-Q4 is 2027-03-31. This is primarily due to the following factors. Defra and HM Treasury have agreed a 6-year funding settlement for the Flood and Coastal Erosion Risk Management Investment Programme between April 2021 to March 2027.","narrativeClaimKind":null},{"id":"DEFRA_0236_2324-Q1","year":2025,"name":"FLOOD AND COASTAL EROSION RISK MANAGEMENT","department":"DEFRA","category":"Infrastructure and Construction","description":"A comprehensive flood and coastal resilience investment programme to upgrade and revitalise England's flood defence infrastructure. The programme aims to reduce the harm and damage caused by flooding, protect peoples’ lives and minimise disruption to livelihoods. This is a strategic programme comprising several thousand individual flood and coastal defence projects delivered by the Environment Agency and other Risk Management Authorities.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The challenge of managing and resourcing the transition from the current programme to the next programme commencing on 1 April 2026, including changes to: funding policy, how pipeline projects are identified, and organisational design to deliver the next programme. The Environment Agency and Defra are progressing actions to meet this challenge. However, for the current programme, the Defra Secretary of State has agreed a two-year (2024/25 & 2025/26) target of 52,000 properties better protected, which equates to 140,272 by the end of the now 5 year programme. Delivery confidence assessments for 2025/26 show that the programme is currently on track to achieve this target by 31 March 2026 and this assessment was supported by an Infrastructure Project Authority review in January 2025.","startDate":"2020-04-01","endDate":"2026-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 decreased from 31/03/2027 to 31/03/2026. This is primarily due to the following factors‚ Minister Hardy has announced the next programme will begin a year early on 1 April 2026, with the current programme therefore becoming 5 years and ending on 31 March 2026.","fyBaseline":1022.0,"fyForecast":1022.0,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%. N/A - no variance","wholeLifeCost":4613.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 5664 to 4613. This is primarily due to the following factors‚ to reflect the programme end date being brought forward to March 2026.","benefits":21888.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) decreased from 37292 to 21888. This is primarily due to the following factors‚ to reflect the programme end date being brought forward to March 2026.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The challenge of managing and resourcing the transition from the current programme to the next programme commencing on 1 April 2026, including changes to: funding…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 decreased from 31/03/2027 to 31/03/2026. This is primarily due to the following factors‚ Minister Hardy has announced the next programme will begin a year early on 1 April 2026, with the current programme therefore becoming 5 years and ending on 31 March 2026.","narrativeClaimKind":null},{"id":"DEFRA_0236_2324-Q1","year":2026,"name":"FLOOD AND COASTAL EROSION RISK MANAGEMENT","department":"DEFRA","category":"Infrastructure and Construction","description":"From 1 April 2021, Defra announced a new £5.2bn 6-year investment programme for flood & coastal erosion risk management- investing in 2,000 flood defence schemes to better protect 336,000 properties by 2027. Due to the impact of the covid 19 pandemic and a significant spike in inflation this was revised down to 200,000. The new government reduced to a 5 year programme to introduce new funding policy sooner which equated to 140,272 over 5 years with a particular focus on a £4.2bn 2 year programme with a target of 52,000.","ipaDca":"Green","sroDca":null,"deliveryConfidence":"Green","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained amber. This is primarily due to concerns around work being conducted to manage the transition from the current programme to the next programme commencing on 1 April 2026","startDate":"2020-04-01","endDate":"2026-03-31","scheduleNarrative":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same","fyBaseline":1075.16,"fyForecast":1055.79,"fyVariance":1.8,"varianceNarrative":"The budget variance is less than or equal to 5%.\"","wholeLifeCost":4835.25,"costNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Whole Life Cost at 25/26-Q4 (measured in £m) remained at 4,613.000m","benefits":12042.59,"benefitsNarrative":"Compared to financial year 24/25-Q4, the project's departmentally agreed Benefits at 25/26-Q4 (measured in £m) remained at 21,888.000m","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained amber. This is primarily due to concerns around work being conducted to manage the transition from the current programme to the next programme commencing on 1 April 2026 Compared to financial year 24/25-Q4, the project's…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 24/25-Q4, the project's end-date at 25/26-Q4 remained the same","narrativeClaimKind":null}],"previous":{"id":"DEFRA_0236_2324-Q1","year":2025,"name":"FLOOD AND COASTAL EROSION RISK MANAGEMENT","department":"DEFRA","category":"Infrastructure and Construction","description":"A comprehensive flood and coastal resilience investment programme to upgrade and revitalise England's flood defence infrastructure. The programme aims to reduce the harm and damage caused by flooding, protect peoples’ lives and minimise disruption to livelihoods. This is a strategic programme comprising several thousand individual flood and coastal defence projects delivered by the Environment Agency and other Risk Management Authorities.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The challenge of managing and resourcing the transition from the current programme to the next programme commencing on 1 April 2026, including changes to: funding policy, how pipeline projects are identified, and organisational design to deliver the next programme. The Environment Agency and Defra are progressing actions to meet this challenge. However, for the current programme, the Defra Secretary of State has agreed a two-year (2024/25 & 2025/26) target of 52,000 properties better protected, which equates to 140,272 by the end of the now 5 year programme. Delivery confidence assessments for 2025/26 show that the programme is currently on track to achieve this target by 31 March 2026 and this assessment was supported by an Infrastructure Project Authority review in January 2025.","startDate":"2020-04-01","endDate":"2026-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 decreased from 31/03/2027 to 31/03/2026. This is primarily due to the following factors‚ Minister Hardy has announced the next programme will begin a year early on 1 April 2026, with the current programme therefore becoming 5 years and ending on 31 March 2026.","fyBaseline":1022.0,"fyForecast":1022.0,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%. N/A - no variance","wholeLifeCost":4613.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 5664 to 4613. This is primarily due to the following factors‚ to reflect the programme end date being brought forward to March 2026.","benefits":21888.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) decreased from 37292 to 21888. This is primarily due to the following factors‚ to reflect the programme end date being brought forward to March 2026.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The challenge of managing and resourcing the transition from the current programme to the next programme commencing on 1 April 2026, including changes to: funding…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 decreased from 31/03/2027 to 31/03/2026. This is primarily due to the following factors‚ Minister Hardy has announced the next programme will begin a year early on 1 April 2026, with the current programme therefore becoming 5 years and ending on 31 March 2026.","narrativeClaimKind":null},"ratingDelta":-1,"transition":"Improved","endDateDeltaDays":0,"attentionScore":0,"attentionReasons":[]},{"id":"HO_0045_2122-Q1","year":2026,"name":"FRAUD AND CYBER CRIME REPORTING AND ANALYSIS SERVICE","department":"HO","category":"Government Transformation and Service Delivery","description":"The Fraud and Cyber Crime Reporting and Analysis Service (FCCRAS) Programme is a Home Office sponsored reform programme delivered in partnership with law enforcement, government agencies and the private sector. It aims to provide an accessible and effective service for individuals and organisations to report fraud and cyber crime, improving the flow of information and intelligence to support disruption of criminal activity and better protection of the public and businesses. The programme leverages enhanced technology and intelligence-led data analysis to strengthen the national response to fraud and cyber crime, supporting more effective identification, prevention and enforcement activity. The strategic objectives of FCCRAS are improve victim experience and satisfaction, support better criminal justice outcomes, prevent crime and reduce harm, enhance understanding of the threat from serious and organised crime, improve systems interoperability and alignment with wider national programmes.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"GREEN","startDate":"2020-09-01","endDate":null,"scheduleNarrative":"Compared with Q4 2024/25, the project’s end date at Q4 2025/26 has extended from March 2026 to June 2026. This reflects the time required to complete final assurance activity and support a smooth transition to business as usual operations. The subsequent Gateway 5 assurance review, conducted in April 2026, provided a Delivery Confidence Assessment of Green, confirming that the programme is well positioned to proceed to closure. Following confirmation of the Gateway 5 timetable, and to allow sufficient time to address remaining assurance recommendations and complete a comprehensive operational handover, the programme closure date has been revised by three months. The programme is now focused on finalising closure activities and transitioning fully to business‑as‑usual delivery. There is no impact to the approved financial or economic cases. FCCRAS is attending InvestCo for formal closure in June 2026.","fyBaseline":28.77,"fyForecast":28.77,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":169.06,"costNarrative":"Compared to financial year Q4 2024/25, the project's departmentally agreed Whole Cost at Q4 2025/26 has decreased from £182m to £175.3m. This is due to the following factors following the decision to (a) adopt a phased go-live approach to release the service in stages, and (b) progress with a mitigation option to complete the Lot 1 component of programme delivery, the whole life cost of the programme was refined to reflect the actual cost of build and run, and no longer includes optimism bias.","benefits":384.71,"benefitsNarrative":"Compared to financial year Q4 2024/25, the project's departmentally agreed Benefits at Q4 2025/26 remained at £402m. This is primarily due to the following factors benefits remain the same and have been reviewed following revision to the Full Business Case presented to InvestCo in June 2025. The Programme will be closing subject to InvestCo approval in June 2026.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Approvals & decisions"],"evidenceExcerpt":"GREEN Compared with Q4 2024/25, the project’s end date at Q4 2025/26 has extended from March 2026 to June 2026. This reflects the time required to complete final assurance activity and support a smooth transition to business as usual operations. The subsequent Gateway 5 assurance review, conducted in April 2026, provided a Delivery Confidence Assessment of…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared with Q4 2024/25, the project’s end date at Q4 2025/26 has extended from March 2026 to June 2026. This reflects the time required to complete final assurance activity and support a smooth transition to business as usual operations. The subsequent Gateway 5 assurance review, conducted in April 2026, provided a Delivery Confidence Assessment of Green, confirming that the programme is well positioned to proceed to closure. Following confirmation of the Gateway 5 timetable, and to allow sufficient time to address remaining assurance recommendations and complete a comprehensive operational handover, the programme closure date has been revised by three months. The programme is now focused on finalising closure activities and transitioning fully to business‑as‑usual delivery. There is no impact to the approved financial or economic cases. FCCRAS is attending InvestCo for formal closure in June 2026.","narrativeClaimKind":null,"history":[{"id":"HO_0045_2122-Q1","year":2022,"name":"Fraud And Cyber Crime Reporting and Analysis Service","department":"HO","category":"Government Transformation and Service Delivery","description":"The Fraud & Cyber Crime Reporting & Analysis service programme will implement a victim centric transformational change improving the victim reporting experience by collecting the right data first time and exploiting technology to quickly and efficiently process it. The new website, together with improved information and better navigation, will allow for a significantly enhanced self-service experience, providing information and education to prevent vulnerable people from becoming repeat victims.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Senior Responsible Owner Delivery Confidence Assessment rating at 21/22-Q4 is Amber. The FCCRAS programme has 2 phases. Phase 1 (new website and online reporting tool) is planned to go live end 2022. Phase 2 is currently in the Procurement ITN (invitation to negotiate) phase for 3 contracts with 11 suppliers. Outline solutions are under evaluation. The next phase starts May 2022 working solutions/approaches. Preparation underway to ensure we best inform suppliers so that they can provide their best proposition to us by end 2022. Resourcing reviews underway to inform roles required prior to the development of the Full Business Case and the Target Operating Model for the new service design in 2024. IPA recommendations completed apart from : - The Outline Business Case Management Case is reviewed to ensure when drafting the Full Business Case such aforementioned management areas are addressed. Inability to accurately track and hold the programme to account Essential - by Full Business Case. Status : This is work in Progress and will be addressed in the Full Business Case which is not due for completion until end 2022 - Consideration is given to establishing a wider stakeholder group to provide assurance and communication channels Status : stakeholder matrix has been created and associated communications plan is in place and being actioned.","startDate":"2020-09-01","endDate":"2024-08-31","scheduleNarrative":"Your project end-date is 31 AUG 2024. This is primarily due to the following factors: Procurement activity continues throughout 2022 resulting in preferred supplier selection in the final quarter of 2022, Full Business Case approvals and contract award 2nd quarter 2023. Suppliers to start discovery May 2023, go live 2Q24 and sufficient warranty period to take up to Aug 2024. Opportunities to pull dates in will be explored with successful suppliers and work is underway to reduce discovery time and activities required. This will facilitate a more efficient development plan.","fyBaseline":27.34,"fyForecast":27.34,"fyVariance":0.0,"varianceNarrative":"The GMPP project did not provide data","wholeLifeCost":226.0,"costNarrative":"Your projects Baseline Whole Life Cost is 226.34 (£m). This is primarily due to the following factors: In the Outline Business Case (March 2021), budgets were prepared up to the financial year 2028/29. Revenue costs over the lifetime of the project (starting from 2021/22) were £182.2m, and capital costs £32.1m In the revised Outline Business Case (Sept 21), delays to the Procurement phase of the project (and ongoing Legacy costs with IBM) set budgeting back a year, to 2029/30. Revenue costs budgeted to be £193m with a shortfall of £13m funding. Capital costs have been increased to £33m.","benefits":null,"benefitsNarrative":"","themes":["Approvals & decisions","Commercial & supply chain","Cost & funding","Delivery & schedule"],"evidenceExcerpt":"The Senior Responsible Owner Delivery Confidence Assessment rating at 21/22-Q4 is Amber. The FCCRAS programme has 2 phases. Phase 1 (new website and online reporting tool) is planned to go live end 2022. Phase 2 is currently in the Procurement ITN (invitation to negotiate) phase for 3 contracts with 11 suppliers. Outline solutions are under evaluation. The…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022","sourceLabel":"IPA Annual Report 2021-22","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Your project end-date is 31 AUG 2024. This is primarily due to the following factors: Procurement activity continues throughout 2022 resulting in preferred supplier selection in the final quarter of 2022, Full Business Case approvals and contract award 2nd quarter 2023. Suppliers to start discovery May 2023, go live 2Q24 and sufficient warranty period to take up to Aug 2024. Opportunities to pull dates in will be explored with successful suppliers and work is underway to reduce discovery time and activities required. This will facilitate a more efficient development plan.","narrativeClaimKind":null},{"id":"HO_0045_2122-Q1","year":2023,"name":"Fraud And Cyber Crime Reporting and Analysis Service","department":"HO","category":"Government Transformation and Service Delivery","description":"The Fraud and Cyber Crime Reporting and Analysis Service (FCCRAS) is a 150m transformation programme that will replace the existing system and services for reporting and analysis of fraud and cybercrime through Action Fraud and NFIB (National Fraud Intelligence Bureau). Action Fraud and NFIB are run through the City of London Police(CoLP) and are national services because fraud and cybercrime span beyond geographical boundaries and so localforce responses are ill-suited to tackle these crimes. These services are jointly funded by the Home Office (majority funder) and the City of London Corporation. The objectivesGovernment haveidentifiedfor the programme to deliver are: improved victim experience and satisfaction, lead to better criminal justice outcomes, prevent crime and reduce harm, contribute to an improved understanding of the threat from serious and organised crime and improve systems inter-operability and align with national programmes.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber (SRO rating). This is primarily due to the following factors. The IPA assessment and recommendations were welcomed. As Senior Responsible Officer, I recognise the recommendation for ensuring there is a clear and agreed plan with suppliers to develop and deliver a minimal viable product and transition to the new service and this process is under way. This process will give greater confidence of success in our go-live date for the new service in March 2024. We also welcome the recommendation for a continued emphasis on recruiting and retaining the team to deliver, including the continued visibility of any issues with the FCCRAS Programme Board, and have a dedicated workstream to ensure our capacity to delivery is maintained and grown.","startDate":"2020-09-01","endDate":"2024-08-31","scheduleNarrative":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2024-08-31. This is primarily due to the following factors. The replacement of the existing system continues to be planned for Go Live in March 1 2024. All preferred suppliers have now been selected, and the Full Business Case, that will enable contracts to be signed ahead of the Discovery phase of the programme, passed its final approval stage for 31 March 2023.","fyBaseline":29.27,"fyForecast":29.27,"fyVariance":0.0,"varianceNarrative":"Not required as variance is less than 5%","wholeLifeCost":224.0,"costNarrative":"Compared to financial year 21/22-Q4, the project's departmental-agree Whole Life Cost at 22/23-Q4 decreased from 226m. to 224m. This is primarily due to the following factors. In the September 2021 Outline Business Case (OBC) the whole life revenue costs were budgeted to be 193m (with a shortfall of 13m for current supplier legacy costs) and whole life capital costs to be 33m. Revised whole life revenue costs and whole life capital costs based on the Full Business Case, that was approved on 31 March 2023, will be included for the 2023/24 GMPP returns.","benefits":402.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 402m. The project's departmental-agree monetised benefits at 22/23-Q4 is 402m. On 31 March 2023, the Full Business Case (FBC) was approved. The FBC has revised the baseline benefits net present value (NPV) of 340.2million. This revised benefits assessment still remains strong and includes several non monetised benefits that have not been captured in the cost-benefit analysis. These benefits includes functionality to protect more businesses and people through giving targeted, timely advice on how to avoid the latest threats, and increased ability to block and disrupt crime through providing real time information to institutions and organisations who can take down the fraudulent sites, activities and bank accounts we know are enabling criminal activity.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 21/22-Q4, the Delivery Confidence Assessment rating at 22/23-Q4 remained at Amber (SRO rating). This is primarily due to the following factors. The IPA assessment and recommendations were welcomed. As Senior Responsible Officer, I recognise the recommendation for ensuring there is a clear and agreed plan with suppliers to develop…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 21/22-Q4, the project's end-date at 22/23-Q4 remained schedule to finish on 2024-08-31. This is primarily due to the following factors. The replacement of the existing system continues to be planned for Go Live in March 1 2024. All preferred suppliers have now been selected, and the Full Business Case, that will enable contracts to be signed ahead of the Discovery phase of the programme, passed its final approval stage for 31 March 2023.","narrativeClaimKind":null},{"id":"HO_0045_2122-Q1","year":2024,"name":"Fraud And Cyber Crime Reporting and Analysis Service","department":"HO","category":"Government Transformation and Service Delivery","description":"The Fraud and Cyber Crime Reporting and Analysis Service (FCCRAS) is a 150m transformation programme that will replace the existing system and services for reporting and analysis of Fraud and Cyber Crime through Action Fraud and NFIB (National Fraud Intelligence Bureau). Action Fraud and NFIB are run through the City of London Police (CoLP) and are national services because fraud and cybercrime span beyond geographical boundaries and so local force responses are ill-suited to tackle these crimes. These services are jointly funded by the Home Office (majority funder) and the City of London Corporation. The objectives Government have identified for the programme to deliver are improved victim experience and satisfaction, lead to better criminal justice outcomes, prevent crime and reduce harm, contribute to an improved understanding of the threat from serious and organised crime and improve systems interoperability and align with national programmes","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 22/23-Q4, Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 increased from Amber to Red. This is primarily due to the following factors. The IPA are scheduled to carry out a Gate 0 review on 04 June 2024","startDate":"2020-09-01","endDate":"2024-08-31","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2024-08-31. This is primarily due to the following factors. The project end-date is now scheduled for 31-March 2025, due to a shift right in the delivery of the new service to November 2024. This is primarily due to the Lot 1 supplier (Capita) not delivery against the original baseline plan. There are remaining conditions outstanding on Capita to deliver as part of their rectified plan, and a task and finish group has been established to ensure completion of these, which will enable the programme to have an approved E2E DIP and definitive Go Live date.","fyBaseline":24.17,"fyForecast":18.9,"fyVariance":-22.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The financial case has been remodelled to factor in the change in delivery dates, and incorporating in external factors to the budget, such as inflation and more in depth understanding of the requirements of being an intelligent client. _x000D_ _x000D_ The financial case is due to be presented at InvestCo on 01 May 2024","wholeLifeCost":152.0,"costNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree Whole Life Cost at 23/24-Q4 decreased from 224m. to 152m. This is primarily due to the following factors. The financial case has been remodelled to factor in the change in delivery dates, and incorporating in external factors to the budget, such as inflation and more in depth understanding of the requirements of being an intelligent client. The Whole Life Cost of the programme has increased by 7.8m_x000D_ _x000D_ The financial case is due to be presented at InvestCo on 01 May 2024","benefits":402.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 23/24-Q4 remained at 402m. On 31 March 2023, the Full Business Case (FBC) was approved. The FBC has revised the baseline benefits net present value (NPV) of 340.2million. This revised benefits assessment still remains strong and includes several non monetised benefits that have not been captured in the cost-benefit analysis. These benefits includes functionality to protect more businesses and people through giving targeted, timely advice on how to avoid the latest threats, and increased ability to block and disrupt crime through providing real time information to institutions and organisations who can take down the fraudulent sites, activities and bank accounts we know are enabling criminal activity.","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 increased from Amber to Red. This is primarily due to the following factors. The IPA are scheduled to carry out a Gate 0 review on 04 June 2024 Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 remained schedule to finish on 2024-08-31. This is primarily due to the following factors. The project end-date is now scheduled for 31-March 2025, due to a shift right in the delivery of the new service to November 2024. This is primarily due to the Lot 1 supplier (Capita) not delivery against the original baseline plan. There are remaining conditions outstanding on Capita to deliver as part of their rectified plan, and a task and finish group has been established to ensure completion of these, which will enable the programme to have an approved E2E DIP and definitive Go Live date.","narrativeClaimKind":null},{"id":"HO_0045_2122-Q1","year":2025,"name":"FRAUD AND CYBER CRIME REPORTING AND ANALYSIS SERVICE","department":"HO","category":"Government Transformation and Service Delivery","description":"The Fraud and Cyber Crime Reporting and Analysis Service (FCCRAS) Programme is implementing a transformational change. Working with law enforcement, government agencies and the private sector, the programme strives to create an accessible service for all to report fraud and cybercrime. It will use enhanced technology, intelligence-led data analysis to disrupt the national rise in fraud and cyber-crime, help protect businesses and the public from deception and bring more criminals to justice.​ The new service aims to: • Make it easy for everyone to report fraud and cyber crime, taking the burden out of reporting and speeding up the time it takes to report • Significantly improve the speed and quality of information provided to law enforcement partners, boosting their chances of successful prosecution • Let victims know what’s happened with their report, including when reporting has aided others to be protected • Protect more businesses and people from fraud and cyber crime through giving targeted, timely advice on how to avoid the latest threats • Block and disrupt crime through providing real time information to institutions and organisations who can take down the fraudulent sites, activities and bank accounts we know are enabling criminal activity • Get ‘upstream’ of the problem by preventing criminals accessing enabling facilities such as bank accounts.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at RED. This is primarily due to the following factors‚ The programme has remained as reporting RED throughout 24/25 due to a delay in the full-service go live (expected to be November 2024). Following consultation with critical stakeholders and legal, the City of London Police paused the Lot 1 delivery aspect of the programme, to review next steps in detail. This activity concluded in Quarter 4 of 24/25 when a new delivery plan, high level design and service blueprint was developed and approved. These artefacts have informed a change request to the full business case.","startDate":"2020-09-01","endDate":"2025-11-28","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/08/2024 to 28/11/2025. This is primarily due to the following factors‚ The programme has remained as reporting RED throughout 24/25 due to a delay in the full-service go live (expected to be November 2024). Following consultation with critical stakeholders and legal, the City of London Police paused the Lot 1 delivery aspect of the programme, to review next steps in detail. This activity concluded in Quarter 4 of 24/25 when a new delivery plan, high level design and service blueprint was developed and approved. These artefacts have informed a change request to the full business case.","fyBaseline":27.48,"fyForecast":33.0,"fyVariance":20.09,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The budget variance on the cost baseline is due to the delay in full-service delivery which shifted run payments to the right to the new suppliers and increased extension costs of the current service provider","wholeLifeCost":182.72,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 152 to 182. This is primarily due to the following factors‚ The Whole Life Cost has increased due to a shift in right of the full-service implementation date, an increase in annual run costs, inflationary impact and additional scope changes which align with wider ambitions for fraud and cybercrime in the UK.","benefits":402.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 402. This is primarily due to the following factors‚ Benefits remained the same and will be reviewed once the change request of the full business case is presented and approved in Quarter 1 of 25/26.","themes":["Cost & funding","Delivery & schedule","Scope & requirements","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at RED. This is primarily due to the following factors‚ The programme has remained as reporting RED throughout 24/25 due to a delay in the full-service go live (expected to be November 2024). Following consultation with…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/08/2024 to 28/11/2025. This is primarily due to the following factors‚ The programme has remained as reporting RED throughout 24/25 due to a delay in the full-service go live (expected to be November 2024). Following consultation with critical stakeholders and legal, the City of London Police paused the Lot 1 delivery aspect of the programme, to review next steps in detail. This activity concluded in Quarter 4 of 24/25 when a new delivery plan, high level design and service blueprint was developed and approved. These artefacts have informed a change request to the full business case.","narrativeClaimKind":null},{"id":"HO_0045_2122-Q1","year":2026,"name":"FRAUD AND CYBER CRIME REPORTING AND ANALYSIS SERVICE","department":"HO","category":"Government Transformation and Service Delivery","description":"The Fraud and Cyber Crime Reporting and Analysis Service (FCCRAS) Programme is a Home Office sponsored reform programme delivered in partnership with law enforcement, government agencies and the private sector. It aims to provide an accessible and effective service for individuals and organisations to report fraud and cyber crime, improving the flow of information and intelligence to support disruption of criminal activity and better protection of the public and businesses. The programme leverages enhanced technology and intelligence-led data analysis to strengthen the national response to fraud and cyber crime, supporting more effective identification, prevention and enforcement activity. The strategic objectives of FCCRAS are improve victim experience and satisfaction, support better criminal justice outcomes, prevent crime and reduce harm, enhance understanding of the threat from serious and organised crime, improve systems interoperability and alignment with wider national programmes.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"GREEN","startDate":"2020-09-01","endDate":null,"scheduleNarrative":"Compared with Q4 2024/25, the project’s end date at Q4 2025/26 has extended from March 2026 to June 2026. This reflects the time required to complete final assurance activity and support a smooth transition to business as usual operations. The subsequent Gateway 5 assurance review, conducted in April 2026, provided a Delivery Confidence Assessment of Green, confirming that the programme is well positioned to proceed to closure. Following confirmation of the Gateway 5 timetable, and to allow sufficient time to address remaining assurance recommendations and complete a comprehensive operational handover, the programme closure date has been revised by three months. The programme is now focused on finalising closure activities and transitioning fully to business‑as‑usual delivery. There is no impact to the approved financial or economic cases. FCCRAS is attending InvestCo for formal closure in June 2026.","fyBaseline":28.77,"fyForecast":28.77,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":169.06,"costNarrative":"Compared to financial year Q4 2024/25, the project's departmentally agreed Whole Cost at Q4 2025/26 has decreased from £182m to £175.3m. This is due to the following factors following the decision to (a) adopt a phased go-live approach to release the service in stages, and (b) progress with a mitigation option to complete the Lot 1 component of programme delivery, the whole life cost of the programme was refined to reflect the actual cost of build and run, and no longer includes optimism bias.","benefits":384.71,"benefitsNarrative":"Compared to financial year Q4 2024/25, the project's departmentally agreed Benefits at Q4 2025/26 remained at £402m. This is primarily due to the following factors benefits remain the same and have been reviewed following revision to the Full Business Case presented to InvestCo in June 2025. The Programme will be closing subject to InvestCo approval in June 2026.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Approvals & decisions"],"evidenceExcerpt":"GREEN Compared with Q4 2024/25, the project’s end date at Q4 2025/26 has extended from March 2026 to June 2026. This reflects the time required to complete final assurance activity and support a smooth transition to business as usual operations. The subsequent Gateway 5 assurance review, conducted in April 2026, provided a Delivery Confidence Assessment of…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared with Q4 2024/25, the project’s end date at Q4 2025/26 has extended from March 2026 to June 2026. This reflects the time required to complete final assurance activity and support a smooth transition to business as usual operations. The subsequent Gateway 5 assurance review, conducted in April 2026, provided a Delivery Confidence Assessment of Green, confirming that the programme is well positioned to proceed to closure. Following confirmation of the Gateway 5 timetable, and to allow sufficient time to address remaining assurance recommendations and complete a comprehensive operational handover, the programme closure date has been revised by three months. The programme is now focused on finalising closure activities and transitioning fully to business‑as‑usual delivery. There is no impact to the approved financial or economic cases. FCCRAS is attending InvestCo for formal closure in June 2026.","narrativeClaimKind":null}],"previous":{"id":"HO_0045_2122-Q1","year":2025,"name":"FRAUD AND CYBER CRIME REPORTING AND ANALYSIS SERVICE","department":"HO","category":"Government Transformation and Service Delivery","description":"The Fraud and Cyber Crime Reporting and Analysis Service (FCCRAS) Programme is implementing a transformational change. Working with law enforcement, government agencies and the private sector, the programme strives to create an accessible service for all to report fraud and cybercrime. It will use enhanced technology, intelligence-led data analysis to disrupt the national rise in fraud and cyber-crime, help protect businesses and the public from deception and bring more criminals to justice.​ The new service aims to: • Make it easy for everyone to report fraud and cyber crime, taking the burden out of reporting and speeding up the time it takes to report • Significantly improve the speed and quality of information provided to law enforcement partners, boosting their chances of successful prosecution • Let victims know what’s happened with their report, including when reporting has aided others to be protected • Protect more businesses and people from fraud and cyber crime through giving targeted, timely advice on how to avoid the latest threats • Block and disrupt crime through providing real time information to institutions and organisations who can take down the fraudulent sites, activities and bank accounts we know are enabling criminal activity • Get ‘upstream’ of the problem by preventing criminals accessing enabling facilities such as bank accounts.","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at RED. This is primarily due to the following factors‚ The programme has remained as reporting RED throughout 24/25 due to a delay in the full-service go live (expected to be November 2024). Following consultation with critical stakeholders and legal, the City of London Police paused the Lot 1 delivery aspect of the programme, to review next steps in detail. This activity concluded in Quarter 4 of 24/25 when a new delivery plan, high level design and service blueprint was developed and approved. These artefacts have informed a change request to the full business case.","startDate":"2020-09-01","endDate":"2025-11-28","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/08/2024 to 28/11/2025. This is primarily due to the following factors‚ The programme has remained as reporting RED throughout 24/25 due to a delay in the full-service go live (expected to be November 2024). Following consultation with critical stakeholders and legal, the City of London Police paused the Lot 1 delivery aspect of the programme, to review next steps in detail. This activity concluded in Quarter 4 of 24/25 when a new delivery plan, high level design and service blueprint was developed and approved. These artefacts have informed a change request to the full business case.","fyBaseline":27.48,"fyForecast":33.0,"fyVariance":20.09,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The budget variance on the cost baseline is due to the delay in full-service delivery which shifted run payments to the right to the new suppliers and increased extension costs of the current service provider","wholeLifeCost":182.72,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 152 to 182. This is primarily due to the following factors‚ The Whole Life Cost has increased due to a shift in right of the full-service implementation date, an increase in annual run costs, inflationary impact and additional scope changes which align with wider ambitions for fraud and cybercrime in the UK.","benefits":402.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 402. This is primarily due to the following factors‚ Benefits remained the same and will be reviewed once the change request of the full business case is presented and approved in Quarter 1 of 25/26.","themes":["Cost & funding","Delivery & schedule","Scope & requirements","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at RED. This is primarily due to the following factors‚ The programme has remained as reporting RED throughout 24/25 due to a delay in the full-service go live (expected to be November 2024). Following consultation with…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/08/2024 to 28/11/2025. This is primarily due to the following factors‚ The programme has remained as reporting RED throughout 24/25 due to a delay in the full-service go live (expected to be November 2024). Following consultation with critical stakeholders and legal, the City of London Police paused the Lot 1 delivery aspect of the programme, to review next steps in detail. This activity concluded in Quarter 4 of 24/25 when a new delivery plan, high level design and service blueprint was developed and approved. These artefacts have informed a change request to the full business case.","narrativeClaimKind":null},"ratingDelta":-2,"transition":"Improved","endDateDeltaDays":null,"attentionScore":0,"attentionReasons":[]},{"id":"BEIS_0115_2223-Q1","year":2026,"name":"GREEN HEAT NETWORK FUND","department":"DESNZ","category":"Infrastructure and Construction","description":"The Green Heat Network Fund supports the development of low‑carbon heat networks in England. Launched in 2022 to help cut carbon emissions from heating, it provides capital funding to build new low-carbon heat networks and to decarbonise existing ones, helping homes, public buildings and businesses move away from fossil fuels.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The scheme continues to deliver against its objectives, with milestones being met and financial performance broadly on track. Some delays in project implementation may impact the timing of benefits realisation, but these risks are understood and are being actively managed.","startDate":"2022-03-07","endDate":"2030-03-29","scheduleNarrative":"The project's end-date remains unchanged, with the end of funding phase scheduled for 31/03/2028.","fyBaseline":205.8,"fyForecast":202.64,"fyVariance":1.54,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":730.01,"costNarrative":"GHNF WLC has been revised in the updated (2026) GHNF Full Business Case (FBC) to account for the additional budget allocated to the scheme through Phases 1 and 2 of the 2025 Spending Review. The revised WLC will be published in due course.","benefits":3464.54,"benefitsNarrative":"GHNF benefits forecast has been revised in the updated (2026) GHNF Full Business Case (FBC) to account for the additional budget allocated to the scheme through Phases 1 and 2 of the 2025 Spending Review. The revised benefits forecast will be published in due course.","themes":["Cost & funding","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"The scheme continues to deliver against its objectives, with milestones being met and financial performance broadly on track. Some delays in project implementation may impact the timing of benefits realisation, but these risks are understood and are being actively managed. The project's end-date remains unchanged, with the end of funding phase scheduled for…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date remains unchanged, with the end of funding phase scheduled for 31/03/2028.","narrativeClaimKind":null,"history":[{"id":"BEIS_0115_2223-Q1","year":2023,"name":"Green Heat Network Fund","department":"DESNZ","category":"Infrastructure and Construction","description":"The Green Heat Network Fund (GHNF) is a 288 million capital grant fund that supports the following: (i) Commercialisation and construction of new low and zero-carbon heat networks (including the supply of cooling). (ii) The retrofitting and expansion of existing heat networks to make them low carbon. (iii) The development and growth of the heat network market, addressing some of the challenges of decarbonising the UK's heat sector.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 is Amber. This is primarily due to the following factors. Since the GHNF was launched in March last year, three funding rounds have been completed, with the fourth recently closing for applications. To date, we have publicly announced more than 117 million of GHNF awards to 9 projects which use a range of low-carbon technologies including heat pumps, recovered heat, deep geothermal and energy from waste. This includes an announcement on 12 May of nearly 91.5 million in grant funding to 7 projects in Yorkshire, Cornwall, Reading and London. We believe this is the biggest ever announcement of capital funding for heat network projects in this country in terms of the cumulative amount. The UK Infrastructure Bank also announced on 20 December last year that they will offer councils streamlined access to their 4 billion local authority lending product as part of the GHNF application process. In Powering Up Britain and the Energy Security Plan, published on 30 March, the Government announced that capital support will be extended to 2028 to facilitate the continued growth of low carbon heat networks, including 220m additional capital support over 2025/6 and 2026/7 for the Heat Network Transformation Programme, of which the GHNF is a part. Following this, on 30 May, we announced that additional funding will be available for the GHNF and that projects can now apply for funding that can be drawn down in the financial years through to 2026-27. Further details will be announced in due course.Amendments to the scheme rules have also been included in the latest iteration of the guidance for applicants, which will apply from Round 6. These concern changes to the scheme eligibility with respect to networks supplying new build properties.","startDate":"2022-03-07","endDate":"2025-03-30","scheduleNarrative":"The project's end-date at 22/23-Q4 is 2025-03-30. This is primarily due to the following factors. The project's end-date at 22/23-Q4 is 2025-03-30. This is due to: Currently, the project end-date remains unchanged but the award of 220m to the Heat Network Transformation Programme for FY2025/26 and FY2026/27 means that continued capital support will be available for longer.","fyBaseline":101.5,"fyForecast":10.14,"fyVariance":-90.0,"varianceNarrative":"Year 1 CDEL spent was substantially lower than Year 1 budget. This underspend was expected at the point of business case approval and unspent funds were offered for reallocation in a timely manner.","wholeLifeCost":298.0,"costNarrative":"The project's departmental-agree Whole Life Cost at 22/23-Q4 is 298m. This is primarily due to the following factors. The project's departmental-agree Whole Life Cost at 22/23-Q4 is 298m. This is due to: The scheme is on track to be delivered to budget, with recorded CDEL underspend in year 1.","benefits":2267.0,"benefitsNarrative":"The project's departmental-agree monetised benefits at 22/23-Q4 is 2267m. GHNF's departmental-agreed total monetised benefits is expected to be an estimated 2267.05m over its lifetime (baseline). This estimate remains the same at 22/23. Specifically, the GHNF project is tracking the following benefits:1. An increased volume of thermal energy supplied through low-carbon sources2. Decreased carbon intensity of heat delivered by GHNF supported heat networks3. Monetised carbon savings and air quality improvements4. Increased use of recovered heat in heat networks funded via GHNF5. Increased investment in the UK heat network market","themes":["Cost & funding","Approvals & decisions","Delivery & schedule"],"evidenceExcerpt":"The Senior Responsible Owner's Delivery Confidence Assessment rating at 22/23-Q4 is Amber. This is primarily due to the following factors. Since the GHNF was launched in March last year, three funding rounds have been completed, with the fourth recently closing for applications. To date, we have publicly announced more than 117 million of GHNF awards to 9…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2022-23","sourceLabel":"IPA Annual Report 2022-23","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 22/23-Q4 is 2025-03-30. This is primarily due to the following factors. The project's end-date at 22/23-Q4 is 2025-03-30. This is due to: Currently, the project end-date remains unchanged but the award of 220m to the Heat Network Transformation Programme for FY2025/26 and FY2026/27 means that continued capital support will be available for longer.","narrativeClaimKind":null},{"id":"BEIS_0115_2223-Q1","year":2024,"name":"Green Heat Network Fund","department":"DESNZ","category":"Infrastructure and Construction","description":"The vision for the GHNF scheme is to incentivise the transition of the heat network market to low-carbon heat sources via targeted financial support, that will help stimulate the increased deployment of low-carbon technologies at scale to support governments Net Zero agenda. The GHNF objectives are as follows:(i) Achieve carbon savings and decreases in carbon intensity of heat supplied. (ii) Increase the total amount of low-carbon heat utilisation in heat networks (both retrofitted and new heat networks). (iii) Contribute towards market transformations across the investment landscape and supply chain that will better prepare the heat network sector for further decarbonisation.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 22/23-Q4, Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 decreased from Amber to Green. This is primarily due to the following factors. GHNF opened to applicants in March 2022 as a 288m capital grant fund. Further capital was secured for the scheme in 2023. This enabled us to extend the scheme and allocate additional funding in line with a strong pipeline and high demand. Having implemented an extension to Delivery Partner contract, the overall delivery confidence is high.","startDate":"2022-03-07","endDate":"2028-06-30","scheduleNarrative":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 increased from 2025-03-30 to 2028-06-30. This is primarily due to the following factors. Additional capital allocation was made to GHNF in 2023. As a result, GHNF capital funding is spread over six years - from FY 2022/23 to FY 2027/28. GHNF Delivery Partner contract was extended in light of this. The revised Project End Date is 30/06/2028.","fyBaseline":94.0,"fyForecast":69.7,"fyVariance":-26.0,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. GHNF budget for FY2023/24 was reduced from the original Spending Review allocation of 90m to fund other departmental priorities. GHNF capital spend in this FY was 66.6m against the reduced budget of 73.5m. The same year, the underspend on GHNF resource budget of 4m was of c. 870,000.","wholeLifeCost":null,"costNarrative":"GHNF Whole Life Cost was re-baselined to reflect additional capital and resource allocation made in 2023.","benefits":3344.0,"benefitsNarrative":"Compared to financial year 22/23-Q4, the project's departmental-agree monetised benefits at 2324-Q4 increased from 2267m. to 3344m. The GHNF is tracking the following primary benefits: 1. An increased volume of thermal energy supplied through low-carbon sources 2. Decreased carbon intensity of heat delivered by GHNF supported heat networks 3. Monetised carbon savings and air quality improvements 4. Increased use of recovered heat in heat networks funded via GHNF is being tracked as a secondary benefit. This change was approved in the updated GHNF FBC in Oct-Nov 2023. 5. Increased investment in the UK heat network market","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 22/23-Q4, Senior Responsible Owner's Delivery Confidence Assessment rating at 23/24-Q4 decreased from Amber to Green. This is primarily due to the following factors. GHNF opened to applicants in March 2022 as a 288m capital grant fund. Further capital was secured for the scheme in 2023. This enabled us to extend the scheme and…","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 22/23-Q4, the project's end-date at 23/24-Q4 increased from 2025-03-30 to 2028-06-30. This is primarily due to the following factors. Additional capital allocation was made to GHNF in 2023. As a result, GHNF capital funding is spread over six years - from FY 2022/23 to FY 2027/28. GHNF Delivery Partner contract was extended in light of this. The revised Project End Date is 30/06/2028.","narrativeClaimKind":null},{"id":"BEIS_0115_2223-Q1","year":2025,"name":"GREEN HEAT NETWORK FUND","department":"DESNZ","category":"Infrastructure and Construction","description":"The vision for the GHNF scheme is to incentivise the transition to low-carbon heat networks via targeted financial support, which will stimulate the increased deployment of low-carbon technologies at scale to help deliver Net Zero. The GHNF objectives are as follows: (i) Achieve carbon savings and decreases in carbon intensity of heat supplied. (ii) Increase the total amount of low-carbon heat utilisation in heat networks (both retrofitted and new heat networks). (iii) Contribute towards market transformations across the investment landscape and supply chain that will better prepare the heat network sector for further decarbonisation.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at GREEN. This is primarily due to the following factors: (i) GHNF has now allocated funding to 63 projects in 54 towns and cities, and the scheme is on track to fully deploy its CDEL budget. (ii) Forecast data shows GHNF is on track to meet or exceed its benefit targets. (iii) The GHNF Supplementary Contract is in place in the event that additional CDEL budget is allocated to GHNF.","startDate":"2022-03-07","endDate":null,"scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 30/06/2028 to 31/03/2030. This is primarily due to the following factors: The revised project end-date reflects the end-date of the recently procured Supplementary GHNF Delivery Partner Contract, which is now in place. The previous end-date reflected the existing GHNF Delivery Partner contract.","fyBaseline":103.6,"fyForecast":127.22,"fyVariance":22.8,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors: GHNF’s 2024/25 capital spend was approximately 122% of its Year 3 budget. The additional 22% was from underspend elsewhere in the Department.","wholeLifeCost":701.63,"costNarrative":"The project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) is 701. This is primarily due to the following factors: The GHNF WLC comprises of (i) GHNF CDEL grant budget and (ii) internal/other costs associated with administering and evaluating the GHNF.","benefits":3344.41,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 3344. This is primarily due to the following factors: Forecast data shows GHNF is on track to meet or exceed its benefit targets.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Technical & integration"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at GREEN. This is primarily due to the following factors: (i) GHNF has now allocated funding to 63 projects in 54 towns and cities, and the scheme is on track to fully deploy its CDEL budget. (ii) Forecast data shows GHNF is…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 30/06/2028 to 31/03/2030. This is primarily due to the following factors: The revised project end-date reflects the end-date of the recently procured Supplementary GHNF Delivery Partner Contract, which is now in place. The previous end-date reflected the existing GHNF Delivery Partner contract.","narrativeClaimKind":null},{"id":"BEIS_0115_2223-Q1","year":2026,"name":"GREEN HEAT NETWORK FUND","department":"DESNZ","category":"Infrastructure and Construction","description":"The Green Heat Network Fund supports the development of low‑carbon heat networks in England. Launched in 2022 to help cut carbon emissions from heating, it provides capital funding to build new low-carbon heat networks and to decarbonise existing ones, helping homes, public buildings and businesses move away from fossil fuels.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"The scheme continues to deliver against its objectives, with milestones being met and financial performance broadly on track. Some delays in project implementation may impact the timing of benefits realisation, but these risks are understood and are being actively managed.","startDate":"2022-03-07","endDate":"2030-03-29","scheduleNarrative":"The project's end-date remains unchanged, with the end of funding phase scheduled for 31/03/2028.","fyBaseline":205.8,"fyForecast":202.64,"fyVariance":1.54,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":730.01,"costNarrative":"GHNF WLC has been revised in the updated (2026) GHNF Full Business Case (FBC) to account for the additional budget allocated to the scheme through Phases 1 and 2 of the 2025 Spending Review. The revised WLC will be published in due course.","benefits":3464.54,"benefitsNarrative":"GHNF benefits forecast has been revised in the updated (2026) GHNF Full Business Case (FBC) to account for the additional budget allocated to the scheme through Phases 1 and 2 of the 2025 Spending Review. The revised benefits forecast will be published in due course.","themes":["Cost & funding","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"The scheme continues to deliver against its objectives, with milestones being met and financial performance broadly on track. Some delays in project implementation may impact the timing of benefits realisation, but these risks are understood and are being actively managed. The project's end-date remains unchanged, with the end of funding phase scheduled for…","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date remains unchanged, with the end of funding phase scheduled for 31/03/2028.","narrativeClaimKind":null}],"previous":{"id":"BEIS_0115_2223-Q1","year":2025,"name":"GREEN HEAT NETWORK FUND","department":"DESNZ","category":"Infrastructure and Construction","description":"The vision for the GHNF scheme is to incentivise the transition to low-carbon heat networks via targeted financial support, which will stimulate the increased deployment of low-carbon technologies at scale to help deliver Net Zero. The GHNF objectives are as follows: (i) Achieve carbon savings and decreases in carbon intensity of heat supplied. (ii) Increase the total amount of low-carbon heat utilisation in heat networks (both retrofitted and new heat networks). (iii) Contribute towards market transformations across the investment landscape and supply chain that will better prepare the heat network sector for further decarbonisation.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at GREEN. This is primarily due to the following factors: (i) GHNF has now allocated funding to 63 projects in 54 towns and cities, and the scheme is on track to fully deploy its CDEL budget. (ii) Forecast data shows GHNF is on track to meet or exceed its benefit targets. (iii) The GHNF Supplementary Contract is in place in the event that additional CDEL budget is allocated to GHNF.","startDate":"2022-03-07","endDate":null,"scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 30/06/2028 to 31/03/2030. This is primarily due to the following factors: The revised project end-date reflects the end-date of the recently procured Supplementary GHNF Delivery Partner Contract, which is now in place. The previous end-date reflected the existing GHNF Delivery Partner contract.","fyBaseline":103.6,"fyForecast":127.22,"fyVariance":22.8,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors: GHNF’s 2024/25 capital spend was approximately 122% of its Year 3 budget. The additional 22% was from underspend elsewhere in the Department.","wholeLifeCost":701.63,"costNarrative":"The project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) is 701. This is primarily due to the following factors: The GHNF WLC comprises of (i) GHNF CDEL grant budget and (ii) internal/other costs associated with administering and evaluating the GHNF.","benefits":3344.41,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 3344. This is primarily due to the following factors: Forecast data shows GHNF is on track to meet or exceed its benefit targets.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Technical & integration"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at GREEN. This is primarily due to the following factors: (i) GHNF has now allocated funding to 63 projects in 54 towns and cities, and the scheme is on track to fully deploy its CDEL budget. (ii) Forecast data shows GHNF is…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 30/06/2028 to 31/03/2030. This is primarily due to the following factors: The revised project end-date reflects the end-date of the recently procured Supplementary GHNF Delivery Partner Contract, which is now in place. The previous end-date reflected the existing GHNF Delivery Partner contract.","narrativeClaimKind":null},"ratingDelta":0,"transition":"Unchanged","endDateDeltaDays":null,"attentionScore":0,"attentionReasons":[]},{"id":"HO_0150_2223-Q2","year":2026,"name":"MARITIME CAPABILITIES REPLACEMENT PROGRAMME","department":"HO","category":"Government Transformation and Service Delivery","description":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information, Section 43 - Commercial interests","startDate":null,"endDate":null,"scheduleNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide costs/schedule information","wholeLifeCost":null,"costNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","benefits":null,"benefitsNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","themes":["Delivery & schedule","Cost & funding","Commercial & supply chain"],"evidenceExcerpt":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information, Section 43 - Commercial interests The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","narrativeClaimKind":null,"history":[{"id":"HO_0150_2223-Q2","year":2024,"name":"Maritime Capabilities Replacement Programme","department":"HO","category":"Government Transformation and Service Delivery","description":"The Maritime Capabilities Replacement Programme (MCRP) will coordinate the delivery into service of a new fleet of Cutters and Coastal Patrol Vessels (CPVs), with the appropriate capabilities and supporting infrastructure to deliver Home Office and wider UK government maritime security goals and to ensure that the vessels remain 'fit for purpose' for the duration of their operational lifetime.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"ARMP adjustments - Project not yet in a position to give cost/schedule","startDate":null,"endDate":null,"scheduleNarrative":"ARMP adjustments - Project not yet in a position to give cost/schedule","fyBaseline":0.0,"fyForecast":0.0,"fyVariance":null,"varianceNarrative":"ARMP adjustments - Project not yet in a position to give cost/schedule","wholeLifeCost":null,"costNarrative":"ARMP adjustments - Project not yet in a position to give cost/schedule","benefits":null,"benefitsNarrative":"ARMP adjustments - Project not yet in a position to give cost/schedule","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"ARMP adjustments - Project not yet in a position to give cost/schedule ARMP adjustments - Project not yet in a position to give cost/schedule","sourceUrl":"https://www.gov.uk/government/publications/infrastructure-and-projects-authority-annual-report-2023-24","sourceLabel":"IPA Annual Report 2023-24","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"ARMP adjustments - Project not yet in a position to give cost/schedule","narrativeClaimKind":null},{"id":"HO_0150_2223-Q2","year":2025,"name":"MARITIME CAPABILITIES REPLACEMENT PROGRAMME","department":"HO","category":"Government Transformation and Service Delivery","description":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information, Section 43 - Commercial interests","startDate":null,"endDate":null,"scheduleNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","wholeLifeCost":null,"costNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","benefits":null,"benefitsNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain"],"evidenceExcerpt":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information, Section 43 - Commercial interests The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","narrativeClaimKind":null},{"id":"HO_0150_2223-Q2","year":2026,"name":"MARITIME CAPABILITIES REPLACEMENT PROGRAMME","department":"HO","category":"Government Transformation and Service Delivery","description":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information, Section 43 - Commercial interests","startDate":null,"endDate":null,"scheduleNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide costs/schedule information","wholeLifeCost":null,"costNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","benefits":null,"benefitsNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","themes":["Delivery & schedule","Cost & funding","Commercial & supply chain"],"evidenceExcerpt":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information, Section 43 - Commercial interests The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","narrativeClaimKind":null}],"previous":{"id":"HO_0150_2223-Q2","year":2025,"name":"MARITIME CAPABILITIES REPLACEMENT PROGRAMME","department":"HO","category":"Government Transformation and Service Delivery","description":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information, Section 43 - Commercial interests","startDate":null,"endDate":null,"scheduleNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","wholeLifeCost":null,"costNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","benefits":null,"benefitsNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","themes":["Cost & funding","Delivery & schedule","Commercial & supply chain"],"evidenceExcerpt":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information, Section 43 - Commercial interests The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","narrativeClaimKind":null},"ratingDelta":null,"transition":"Not comparable","endDateDeltaDays":null,"attentionScore":0,"attentionReasons":[]},{"id":"DFT_0139_2223-Q1","year":2026,"name":"REDEVELOPMENT EUSTON CONVENTIONAL STATION (RECS)","department":"DFT","category":"Infrastructure and Construction","description":"Euston is one of the UK’s most critical rail transportation hubs. The current station is no longer fit for purpose and operating over capacity, with many station assets reaching the end of their service life. The proposed Redevelopment of Euston Conventional Station (RECS) scheme will update the existing station concourse area to accommodate current and future passenger demand on the West Coast Main Line, improve passenger experience and accessibility, while replacing life expired station assets in a cost-effective manner. The RECS project forms an integral part of the Departments wider plans for the Euston Station Campus. The Department is working with key partners to develop affordable, integrated plans for the Euston Station Campus, which will comprise the new High Speed 2 station, an upgraded Network Rail station and enhancements to the London Underground station and local transport facilities along with a significant level of development. The Government is seeking to deliver benefits far beyond a new, improved station, promoting growth both in the Euston area and nationally with thousands of new homes, jobs and opportunities for businesses to thrive.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 35 - Formulation of government policy","startDate":null,"endDate":null,"scheduleNarrative":"Exempt under Section 35 - Formulation of government policy","fyBaseline":13.34,"fyForecast":13.34,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%","wholeLifeCost":null,"costNarrative":"Exempt under Section 35 - Formulation of government policy","benefits":null,"benefitsNarrative":"Exempt under Section 35 - Formulation of government policy","themes":["Cost & funding"],"evidenceExcerpt":"Exempt under Section 35 - Formulation of government policy Exempt under Section 35 - Formulation of government policy","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 35 - Formulation of government policy","narrativeClaimKind":null,"history":[{"id":"DFT_0139_2223-Q1","year":2025,"name":"REDEVELOPMENT EUSTON CONVENTIONAL STATION (RECS)","department":"DfT","category":"Infrastructure and Construction","description":"Euston is one of the UK’s most critical rail transportation hubs. The current station is no longer fit for purpose and operating over capacity, with many station assets reaching the end of their service life. The proposed Redevelopment of Euston Conventional Station (RECS) scheme will update the existing station concourse area to accommodate current and future passenger demand on the West Coast Main Line, improve passenger experience and accessibility, while replacing life expired station assets in a cost-effective manner. The RECS project forms an integral part of the Departments wider plans for the Euston Station Campus. The Department is working with key partners to develop affordable, integrated plans for the Euston Station Campus, which will comprise the new High Speed 2 station, an upgraded Network Rail station and enhancements to the London Underground station and local transport facilities along with a significant level of development. The Government is seeking to deliver benefits far beyond a new, improved station, promoting growth both in the Euston area and nationally with thousands of new homes, jobs and opportunities for businesses to thrive.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Section 35 - Formulation of government policy","startDate":null,"endDate":null,"scheduleNarrative":"Section 35 - Formulation of government policy","fyBaseline":12.89,"fyForecast":12.89,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%. RECS is currently being reset and holding the latest Spending Review 25 Phase 1 Rail Network Enhancement Pipeline (RNEP) interim funding baseline position as its CP7 forecast (£1.3bn-1.55bn set in SR21 at Q3 2019 prices).","wholeLifeCost":null,"costNarrative":"Section 35 - Formulation of government policy","benefits":null,"benefitsNarrative":"The project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) is exempted. This is primarily due to the following factors‚ RECS is currently being reset, and a revised scope will be confirmed in Summer 2025 as part of the completion of the Euston Campus Spatial Planning exercise. Benefits of the revised scope have not been calculated yet.","themes":["Cost & funding","Approvals & decisions","Governance & assurance","Scope & requirements"],"evidenceExcerpt":"Section 35 - Formulation of government policy Section 35 - Formulation of government policy","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Section 35 - Formulation of government policy","narrativeClaimKind":null},{"id":"DFT_0139_2223-Q1","year":2026,"name":"REDEVELOPMENT EUSTON CONVENTIONAL STATION (RECS)","department":"DFT","category":"Infrastructure and Construction","description":"Euston is one of the UK’s most critical rail transportation hubs. The current station is no longer fit for purpose and operating over capacity, with many station assets reaching the end of their service life. The proposed Redevelopment of Euston Conventional Station (RECS) scheme will update the existing station concourse area to accommodate current and future passenger demand on the West Coast Main Line, improve passenger experience and accessibility, while replacing life expired station assets in a cost-effective manner. The RECS project forms an integral part of the Departments wider plans for the Euston Station Campus. The Department is working with key partners to develop affordable, integrated plans for the Euston Station Campus, which will comprise the new High Speed 2 station, an upgraded Network Rail station and enhancements to the London Underground station and local transport facilities along with a significant level of development. The Government is seeking to deliver benefits far beyond a new, improved station, promoting growth both in the Euston area and nationally with thousands of new homes, jobs and opportunities for businesses to thrive.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Exempt under Section 35 - Formulation of government policy","startDate":null,"endDate":null,"scheduleNarrative":"Exempt under Section 35 - Formulation of government policy","fyBaseline":13.34,"fyForecast":13.34,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%","wholeLifeCost":null,"costNarrative":"Exempt under Section 35 - Formulation of government policy","benefits":null,"benefitsNarrative":"Exempt under Section 35 - Formulation of government policy","themes":["Cost & funding"],"evidenceExcerpt":"Exempt under Section 35 - Formulation of government policy Exempt under Section 35 - Formulation of government policy","sourceUrl":"https://www.gov.uk/government/publications/nista-major-projects-annual-report-2025-26","sourceLabel":"NISTA Major Projects Annual Report 2025-26","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Exempt under Section 35 - Formulation of government policy","narrativeClaimKind":null}],"previous":{"id":"DFT_0139_2223-Q1","year":2025,"name":"REDEVELOPMENT EUSTON CONVENTIONAL STATION (RECS)","department":"DfT","category":"Infrastructure and Construction","description":"Euston is one of the UK’s most critical rail transportation hubs. The current station is no longer fit for purpose and operating over capacity, with many station assets reaching the end of their service life. The proposed Redevelopment of Euston Conventional Station (RECS) scheme will update the existing station concourse area to accommodate current and future passenger demand on the West Coast Main Line, improve passenger experience and accessibility, while replacing life expired station assets in a cost-effective manner. The RECS project forms an integral part of the Departments wider plans for the Euston Station Campus. The Department is working with key partners to develop affordable, integrated plans for the Euston Station Campus, which will comprise the new High Speed 2 station, an upgraded Network Rail station and enhancements to the London Underground station and local transport facilities along with a significant level of development. The Government is seeking to deliver benefits far beyond a new, improved station, promoting growth both in the Euston area and nationally with thousands of new homes, jobs and opportunities for businesses to thrive.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Section 35 - Formulation of government policy","startDate":null,"endDate":null,"scheduleNarrative":"Section 35 - Formulation of government policy","fyBaseline":12.89,"fyForecast":12.89,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%. RECS is currently being reset and holding the latest Spending Review 25 Phase 1 Rail Network Enhancement Pipeline (RNEP) interim funding baseline position as its CP7 forecast (£1.3bn-1.55bn set in SR21 at Q3 2019 prices).","wholeLifeCost":null,"costNarrative":"Section 35 - Formulation of government policy","benefits":null,"benefitsNarrative":"The project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) is exempted. This is primarily due to the following factors‚ RECS is currently being reset, and a revised scope will be confirmed in Summer 2025 as part of the completion of the Euston Campus Spatial Planning exercise. Benefits of the revised scope have not been calculated yet.","themes":["Cost & funding","Approvals & decisions","Governance & assurance","Scope & requirements"],"evidenceExcerpt":"Section 35 - Formulation of government policy Section 35 - Formulation of government policy","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Section 35 - Formulation of government policy","narrativeClaimKind":null},"ratingDelta":null,"transition":"Not comparable","endDateDeltaDays":null,"attentionScore":0,"attentionReasons":[]}],"leavers":[{"id":"BEIS_0001_2122-Q2","year":2025,"name":"LOW COST NUCLEAR PROGRAMME (ROLLS ROYCE SMRS CHALLENGE)","department":"DESNZ","category":"Infrastructure and Construction","description":"The Low Cost Nuclear Programme Phase 2 is a 468m (210 grant + 258 match funding) Research and Development (R&D) and innovation project aiming to further develop the UK small modular reactor power station concept, including maturation of engineering design iterations and progress through the regulatory Generic Design Assessment (GDA) to at least the completion of the Step 2 by 31/03/25. The grant recipient, and lead on the project is Rolls Royce SMR Ltd. DESNZ is responsible for the project, and have appointed UKRI as delivery partner, providing programme management and assurance of the grant.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at GREEN. This is primarily due to the following factors‚ Active work has been completed by Rolls Royce SMR Ltd against the latest version of the project plan. A final significant PCR stabilised project finance and milestones in the last few months of the programme. Work on the project during the final year has shifted and gone beyond the completion of Step 2 of the Generic Design Assessment (GDA) to maintaining the consistency of work as part of a much larger industry led programme.","startDate":"2021-05-01","endDate":"2025-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2025. This is primarily due to the following factors‚ Key drivers for the timeline of the project were the need to reach design maturity points and progress through Generic Design Assessment (GDA). Step 2 of GDA was completed by 31/07/2024 with the remainder of the objectives and benefits progressed by 30/03/2025. It should be noted that development of the RR SMR design including further GDA progress continues after the end of grant funding.","fyBaseline":211.36,"fyForecast":197.2,"fyVariance":6.7,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The project underwent several project plan changes during its lifetime with associated budget shifts and optimisation of funding flow. The variance in the final year is a result of significant work moving to the later stages of the project to reflect investor confidence levels and design changes inspired by development and regulatory feedback.","wholeLifeCost":468.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 468. This is primarily due to the following factors‚ The project has delivered key outcomes on design maturity, supply chain requirements and completion of Step 2 of the Generic Design Assessment (GDA) regulatory assessment within the timeframe. Costs were driven by staff resource needed to mature the design and work required to progress GDA to Step 2 and beyond.","benefits":280.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 280. This is primarily due to the following factors‚ As an R&D project the majority of benefits are non-monetised. Direct monetised benefits will be realised through the co-investment in this phase of R&D provided by Rolls Royce SMR Ltd.","themes":["Cost & funding","Scope & requirements","Delivery & schedule","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at GREEN. This is primarily due to the following factors‚ Active work has been completed by Rolls Royce SMR Ltd against the latest version of the project plan. A final significant PCR stabilised project finance and…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2025. This is primarily due to the following factors‚ Key drivers for the timeline of the project were the need to reach design maturity points and progress through Generic Design Assessment (GDA). Step 2 of GDA was completed by 31/07/2024 with the remainder of the objectives and benefits progressed by 30/03/2025. It should be noted that development of the RR SMR design including further GDA progress continues after the end of grant funding.","narrativeClaimKind":null,"outcomeStatus":"Outcome not established in annual CSV","outcomeEvidence":"The project has no record in the 2025-26 release. The annual CSV does not identify whether it delivered, closed early, was replaced or ceased to meet the portfolio criteria."},{"id":"BEIS_0007_2021-Q3","year":2025,"name":"REPLACEMENT ANALYTICAL PROJECT","department":"DESNZ","category":"Infrastructure and Construction","description":"The Replacement Analytical Project is a key component of the Sellafield Ltd Analytical Services, which provides essential services to operations on the Sellafield Site supporting approximately 200 Operational Facilities. The existing facility is over 70 years old and cannot provide long-term capability so new analytical capabilities are needed to be established. The Replacement Analytical Project has therefore been initiated to deliver future analytical capability to the Sellafield site, through a major modification of the National Nuclear Laboratory Central Laboratory. Key modifications are provision of standalone Highly Active (HA), Medium Active (MA) and Special Nuclear Material (SNM) analytical capability. A key part of the scope is the delivery of 135 Analytical Instruments which will perform the ongoing analysis required by facilities at Sellafield. Analytical Services remains essential to the delivery of high hazard reduction and remediation until the completion of the Sellafield Ltd mission.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at RED. This is primarily due to the following factors‚ On the 26th of February 2024, the Sellafield Ltd CEO made the decision to bring the Replacement Analytical Project (RAP) to a strategic pause. SL are reviewing the current and future analytical services requirements of the Sellafield site.","startDate":"2016-09-26","endDate":"2032-10-30","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 10/07/2028 to 30/10/2032. This is primarily due to the following factors‚ As a result of the strategic decision to pause the project, a deferral has been implemented with the forecast project end date aligned to this. However, this is subject to a pending a decision on the final project close out.","fyBaseline":9.95,"fyForecast":9.24,"fyVariance":7.14,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ 2024/25 Departmental Baseline: £9.950m, 2024/25 Actuals: £9.240m. Reflection of Research and Development tax credits received by the project.","wholeLifeCost":737.26,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 735 to 737. This is primarily due to the following factors‚ The baseline was updated in line with 2024/25 indexation.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ This project does not carry monetised benefits. The project has been paused.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at RED. This is primarily due to the following factors‚ On the 26th of February 2024, the Sellafield Ltd CEO made the decision to bring the Replacement Analytical Project (RAP) to a strategic pause. SL are reviewing the…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 10/07/2028 to 30/10/2032. This is primarily due to the following factors‚ As a result of the strategic decision to pause the project, a deferral has been implemented with the forecast project end date aligned to this. However, this is subject to a pending a decision on the final project close out.","narrativeClaimKind":null,"outcomeStatus":"Outcome not established in annual CSV","outcomeEvidence":"The project has no record in the 2025-26 release. The annual CSV does not identify whether it delivered, closed early, was replaced or ceased to meet the portfolio criteria."},{"id":"CO_0014_2122-Q2","year":2025,"name":"National Underground Asset Register (NUAR)","department":"DSIT","category":"Government Transformation and Service Delivery","description":"The National Underground Asset Register (NUAR) is a new digital map of the pipes and cables beneath our feet. The service will improve the efficiency and safety of works and is envisaged to deliver over 4bn of economic growth over 10 years. NUAR is now operated by Ordnance Survey and is live across England, Wales and Northern Ireland. NUAR provides access to data from over 300 organisations, including most of the major energy and water providers, such as Welsh Water, Cadent Gas and UK Power Networks, several major telecommunications companies, including CityFibre and Virgin Media O2, as well as smaller providers of these services, transport organisations and local authorities. The service remains on track to move to Public Beta by spring 2025 and be fully operational by the end of 2025. The legislative updates required to achieve the full benefits of NUAR - giving users the data they need, when they need it - are being progressed through the Data (Use and Access) Bill.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The SRO's Delivery Confidence Assessment rating at 24/25-Q4 remains Amber due to delays in securing Parliamentary time to progress necessary legislative reforms to fully operationalise the service and realise the envisaged benefits of over 400m pa. The required legislative updates are now being progressed through the Data (Use and Access) Bill, which has passed both houses and is currently in consideration of amendments. As such, pending agreement between the houses Royal Assent is on track for summer 2025. Alongside the progress of the legislation, the programme has completed the development and roll out of the service across England, Wales and Northern Ireland and transitioned it to the long-term operator, Ordnance Survey. The requirements to move to Public Beta have been met, and the service is on track to be fully operational by the end of 2025. Engagement has focused on those asset owners whose assets are more critical to planning and executing excavations, as identified by asset owners, with data from over 300 of these organisations now available.","startDate":"2021-08-09","endDate":"2026-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2025 to 31/03/2026. This is primarily due to the following factors‚ The programme competed the development of the NUAR service and transitioned it to the appointed long-term operator by 31/03/25, within the approved schedule. Commitments to move to Public Beta by spring 2025, and to be fully operational by the end of 2025 remain on schedule. The programme has received approval to extend by an additional 12 months to oversee the delivery of Public Beta and Fully Operational commitments, the progression of legislative measures, and to explore, through extensive stakeholder engagement and robust testing, if and how additional benefits could be delivered by increasing access to NUAR data. This funding extension has, in part, been necessitated by fall of the Data Protection and Digital Identity Bill after the general election was called in May 2024. This meant a new Bill was required to pass the NUAR measures through parliament, extending timelines, which is required to full operationalise the service and fully realise the envisaged benefits.","fyBaseline":11.54,"fyForecast":11.16,"fyVariance":3.29,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":42.6,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 35 to 42. This is primarily due to the following factors‚ Funding the continuation of the programme team through the extension period to oversee the delivery of Public Beta and Fully Operational commitments, the progression of legislative measures, and to explore, through extensive stakeholder engagement and robust testing, if and how additional benefits could be delivered by increasing access to NUAR data. The WLC includes a total of £3.3m of contingency funding, secured to protect the service from any disruption or delay to the transition to its long-term operator. The intent remains that these funds will be returned by Q2 if they are not required.","benefits":4832.57,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) decreased from 4914 to 4832. This is primarily due to the following factors‚ Figures have been updated to 2024 prices, in line with figures in the 2024/25 Data (Use and Access) Bill Impact Assessment. This reduces the total benefits from an average of £491m per annum to £483m per annum.","themes":["Cost & funding","Delivery & schedule","Technical & integration","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The SRO's Delivery Confidence Assessment rating at 24/25-Q4 remains Amber due to delays in securing Parliamentary time to progress necessary legislative reforms to…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2025 to 31/03/2026. This is primarily due to the following factors‚ The programme competed the development of the NUAR service and transitioned it to the appointed long-term operator by 31/03/25, within the approved schedule. Commitments to move to Public Beta by spring 2025, and to be fully operational by the end of 2025 remain on schedule. The programme has received approval to extend by an additional 12 months to oversee the delivery of Public Beta and Fully Operational commitments, the progression of legislative measures, and to explore, through extensive stakeholder engagement and robust testing, if and how additional benefits could be delivered by increasing access to NUAR data. This funding extension has, in part, been necessitated by fall of the Data Protection and Digital Identity Bill after the general election was called in May 2024. This meant a new Bill was required to pass the NUAR measures through parliament, extending timelines, which is required to full operationalise the service and fully realise the envisaged benefits.","narrativeClaimKind":null,"outcomeStatus":"Outcome not established in annual CSV","outcomeEvidence":"The project has no record in the 2025-26 release. The annual CSV does not identify whether it delivered, closed early, was replaced or ceased to meet the portfolio criteria."},{"id":"CO_0024_2021-Q2","year":2025,"name":"Civil Service Pensions 2015 Remedy","department":"CO","category":"Government Transformation and Service Delivery","description":"To remove age discrimination within the Civil Service Pension Scheme and remediate impacted member pensions as identified in the 2018 McCloud judgment","ipaDca":null,"sroDca":"Red","deliveryConfidence":"Red","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 decreased from AMBER to RED. This is primarily due to the following factors; the current supplier has delivered the majority of the requirements, it is now on track to complete the agreed remaining work within their contract. In the Gate 5 review undertaken in February 2025, the IPA agreed that the residual work should be completed as a separate project (Remedy Project 7) and rated the programme AMBER We have in place a contract change notice with our current suppliers to issue a minimum 44% of the remedial service statements to retired members by 31 March 2025 and to have processed all returned member decisions received up to 30 October by 28 November (final payroll run before transition to Capita)","startDate":"2020-05-20","endDate":"2024-06-30","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 changed from 30/07/2024 to 30/06/2025. This is primarily due to the following factors; the original programme closure date was predicated on the associated legislation being in place in 2022. The scheme regulations needed to remediate members did not come into force until 1 October 2023 which gave schemes 18 months to provide members with a choice i.e. 31 March 2025. Following our IPA review in February 2024 it was agreed that the Programme should be extended to 30 June 2025 then move to a portfolio delivery for the remaining 4 projects","fyBaseline":11.5,"fyForecast":13.5,"fyVariance":17.39,"varianceNarrative":"The budget has no variance. We received approval from the CO Investment Committee to increase our spend from £36.5M to £50.5M in February 2025","wholeLifeCost":50.5,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 34 to 50. The initial budget as set out in the SOC was £57M. This has been proven to be closer than the reduction estimated at FBC in 2022. The higher costs has been due to a number of factors such as: lack of automation necessitating more manual interventions, complexity of member accounts as we need to rebuild alternative benefit calculations and data issues","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is a legally required rectification programme with no tangible benefits","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 decreased from AMBER to RED. This is primarily due to the following factors; the current supplier has delivered the majority of the requirements, it is now on track to complete the agreed remaining work within their contract. In the…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 changed from 30/07/2024 to 30/06/2025. This is primarily due to the following factors; the original programme closure date was predicated on the associated legislation being in place in 2022. The scheme regulations needed to remediate members did not come into force until 1 October 2023 which gave schemes 18 months to provide members with a choice i.e. 31 March 2025. Following our IPA review in February 2024 it was agreed that the Programme should be extended to 30 June 2025 then move to a portfolio delivery for the remaining 4 projects","narrativeClaimKind":null,"outcomeStatus":"Outcome not established in annual CSV","outcomeEvidence":"The project has no record in the 2025-26 release. The annual CSV does not identify whether it delivered, closed early, was replaced or ceased to meet the portfolio criteria."},{"id":"CO_0025_2021-Q3","year":2025,"name":"ELECTORAL INTEGRITY PROGRAMME","department":"MHCLG","category":"Government Transformation and Service Delivery","description":"The Electoral Integrity Programme delivered the electoral reforms set through the Elections Act 2022 including improvements to voter identification, easier overseas elector voting and removal of the 15-year limit on overseas elector voting rights, and improved election security. The measures were deployed sequentially, with all of the electoral measures coming into force and implemented prior to the July 2024 UK Parliamentary General Election (UKPGE).","ipaDca":"Green","sroDca":null,"deliveryConfidence":"Green","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors The primary objective of the programme to deliver the relevant commitments in the government’s 2019 manifesto, and the provisions of the Elections Act 2022 had been achieved. The programme’s leadership was identified as a source of strength, In particular, as the Senior Responsible Owner was valued by the wider programme community for changing the programme’s approach and the adoption of a far more collegiate approach to programme delivery. The manner and breadth of the programme’s engagement with its stakeholders was maintained, ensuring the programme was appropriately informed by a range of views and built bridges that aided delivery.","startDate":"2017-01-11","endDate":null,"scheduleNarrative":"Compared to the financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2025. This is primarily due to the following factors‚ The programme delivered the changes arising from the new legislation for use in elections held in May 2024 and July 2024. The programme continued through to March 2025, to support the deployment of EU citizens voting and candidacy rights and monitor the realisation of its outcomes following deployment.","fyBaseline":37.92,"fyForecast":36.38,"fyVariance":4.04,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":388.0,"costNarrative":"Compared to the financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 420 to 388. This is primarily due to the following factors‚ Whole life costs are lower than initially anticipated due to lower demand for New Burdens funding than originally modelled. Some underspend has also arisen due to programme activity being delayed beyond programme closure. This activity is being managed via business as usual activity and budgets. This consists of a relatively small amount compared to the New Burdens underspend.","benefits":null,"benefitsNarrative":"Compared to the financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ The Programme has no cash releasing benefits. The entirely qualitative benefits cover 4 themes: fraud; trust; participation; and efficiency.","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors The primary objective of the programme to deliver the relevant commitments in the government’s 2019 manifesto, and the provisions of the Elections Act 2022…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to the financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2025. This is primarily due to the following factors‚ The programme delivered the changes arising from the new legislation for use in elections held in May 2024 and July 2024. The programme continued through to March 2025, to support the deployment of EU citizens voting and candidacy rights and monitor the realisation of its outcomes following deployment.","narrativeClaimKind":null,"outcomeStatus":"Outcome not established in annual CSV","outcomeEvidence":"The project has no record in the 2025-26 release. The annual CSV does not identify whether it delivered, closed early, was replaced or ceased to meet the portfolio criteria."},{"id":"CO_0029_2021-Q4","year":2025,"name":"WORKPLACE SERVICES TRANSFORMATION PROGRAMME","department":"CO","category":"Government Transformation and Service Delivery","description":"The Workplace Services Transformation Programme has been established to realise the ambition of a transformed workplace experience for all Government Property Agency (GPA) customers (end users) and to ensure better value for our clients (Departments).","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors… The programme is now complete, recommendations made by IPA/NISTA are nearing completion.","startDate":"2020-07-01","endDate":null,"scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 01/07/2024 to 30/04/2025. This is primarily due to the following factors… The programme is now complete, live services have been fully integrated into GPAs daily operations. Programme activity has now ceased.","fyBaseline":94.46,"fyForecast":87.37,"fyVariance":7.5,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors… The competitive bid process generated an annual saving compared to the Should Cost Model utilised in the OBC, with those savings driven mainly form the Hard and Soft FM elements of the contracts.","wholeLifeCost":1059.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 1059. This is primarily due to the following factors… The agreed baseline was set at the OBC stage which was submitted during 2022. The project has subsequently tracked an updated Forecasted WLC at £1,019m, as a result of a more competitive bid process and fully amended for variations agreed following mobilisation of the contracts.","benefits":-31.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at -£31m. This is primarily due to the following factors… The agreed baseline was set at the OBC stage which was submitted during 2022. The project has subsequently tracked an updated Forecasted Benefits at £11m, as a result of a more competitive bid process and fully amended for variations agreed following mobilisation of the contracts.","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors… The programme is now complete, recommendations made by IPA/NISTA are nearing completion. Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 01/07/2024 to 30/04/2025. This is primarily due to the following factors… The programme is now complete, live services have been fully integrated into GPAs daily operations. Programme activity has now ceased.","narrativeClaimKind":null,"outcomeStatus":"Outcome not established in annual CSV","outcomeEvidence":"The project has no record in the 2025-26 release. The annual CSV does not identify whether it delivered, closed early, was replaced or ceased to meet the portfolio criteria."},{"id":"CO_0133_2223-Q1","year":2025,"name":"Government Hubs and Whitehall Campus Programme","department":"CO","category":"Government Transformation and Service Delivery","description":"The Government Hubs and Whitehall Campus (WHC) programme is transformative, delivering the Government’s priorities: providing a smaller, better and greener public estate; strengthening the UK’s economic recovery from Covid-19; levelling up economic opportunity, maximising productivity and improving value; supporting the government’s ambition to reach net zero carbon emissions; strengthening the Union of the United Kingdom","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The Government Hubs and Whitehall Campus programme remains Amber in line with the IPA rating given in July 2024. In the period the Programme has delivered a further two government hubs in Croydon, 2 Ruskin Square and London, 22 Whitehall plus a project previously within the programme is now a GMPP in its own right. Since the last IPA Review the programme has successfully addressed recommendations including reviewing ways of working with strategic partners and greater involvement in cross-government committees. The operating model is under review as part of a wider GPA organisational design review, which along with an accelerated Plan for London and our SR settlement, will inform an updated Business Case to be submitted to CO and HMT","startDate":"2015-05-01","endDate":"2030-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2030. This is primarily due to the following factors‚ The GPA Government Hubs and Whitehall Campus Programme will support the Government’s Strategic requirements to relocate 22,000 Civil Servants out of London and into regional Hubs, and consolidate 53,400 FTE in the Regions by 2030 to promote economic growth","fyBaseline":166.9,"fyForecast":145.56,"fyVariance":12.79,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ Variance due to delays in key projects (Manchester, First ST, Darlington Brunswick St) with costs now falling in future years","wholeLifeCost":558.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 558. This is primarily due to the following factors‚ The baseline costs for the programme remain unchanged pending SR outcomes","benefits":2546.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 2546. This is primarily due to the following factors‚ The baseline benefits for the programme remain unchanged pending SR outcomes","themes":["Cost & funding","Governance & assurance","Approvals & decisions","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The Government Hubs and Whitehall Campus programme remains Amber in line with the IPA rating given in July 2024. In the period the Programme has delivered a further…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2030. This is primarily due to the following factors‚ The GPA Government Hubs and Whitehall Campus Programme will support the Government’s Strategic requirements to relocate 22,000 Civil Servants out of London and into regional Hubs, and consolidate 53,400 FTE in the Regions by 2030 to promote economic growth","narrativeClaimKind":null,"outcomeStatus":"Outcome not established in annual CSV","outcomeEvidence":"The project has no record in the 2025-26 release. The annual CSV does not identify whether it delivered, closed early, was replaced or ceased to meet the portfolio criteria."},{"id":"CO_0210_2223-Q4","year":2025,"name":"ROSA RENEWAL PROJECT","department":"CO","category":"ICT","description":"To avoid obsolescence, enhance resilience and usability and introduce new capabilities to the Rosa shared IT service for HMG working at SECRET.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at GREEN. This is primarily due to the following factors; The Gate 5 review was successfully completed in April 2025. The project was assessed as GREEN. Recommendations from the review are being assessed and will be considered in future BAU planning.","startDate":"2022-04-01","endDate":"2025-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2025. This is primarily due to the following factors‚ RRP successfully closed in line with the agreed baseline of March 2025","fyBaseline":13.6,"fyForecast":13.6,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%. RRP successfully closed in March 2025 and did not exceed a budget variance of more than 5%","wholeLifeCost":51.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 51. This is primarily due to the following factors‚ RRP was delivered within the agreed baseline budget.","benefits":205.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 205. This is primarily due to the following factors‚ RRP met its objective to improve efficiency when working at SECRET by providing more interoperability, more applications, and making Rosa easier to work on. RRP increased the security and resilience of Rosa as a secure place for departments to store and work with their critical and sensitive information. The project scaled Rosa to meet all known demand. It exceeded its financial targets, achieving a 381% ROI, delivering on time and within budget. The final Gate 5 closure review RAG rated RRP GREEN.","themes":["Cost & funding","Governance & assurance","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at GREEN. This is primarily due to the following factors; The Gate 5 review was successfully completed in April 2025. The project was assessed as GREEN. Recommendations from the review are being assessed and will be…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2025. This is primarily due to the following factors‚ RRP successfully closed in line with the agreed baseline of March 2025","narrativeClaimKind":null,"outcomeStatus":"Outcome not established in annual CSV","outcomeEvidence":"The project has no record in the 2025-26 release. The annual CSV does not identify whether it delivered, closed early, was replaced or ceased to meet the portfolio criteria."},{"id":"CO_0281_2324-Q2","year":2025,"name":"ATS Transformation","department":"CO","category":"Government Transformation and Service Delivery","description":"Government People Group (GPG) needs to replace the existing Civil Service Jobs recruitment platform with a new system that can drive increased efficiencies and improved outcomes after the current supplier contract ends in May 2027. Civil Service Jobs is a highly successful central service with 219 customers enabling HMG to function as one Civil Service in the UK jobs market and maintain strong branding for applicants. Central provision remains the best way the Civil Service can drive value for money for the UK taxpayer. The enhanced functionalities offered by the new Civil Service Jobs will play a significant role in ensuring that a smaller and leaner Civil Service has the right technology in place to enable exceptional recruitment in the most efficient way.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The programme is on a positive trajectory. However, delivering it poses significant challenges due to the diverse range of customers and their complex needs. The development timeline is both challenging and fixed, dictated by the end of the existing contract. Any delays in delivery could diminish the anticipated value of non-cash releasing benefits. While the programme is actively managing a range of risks, the current risk level precludes a green status. To address this, the programme is continuously evaluating resourcing to ensure that the teams possess the necessary capability and capacity. Additionally, there is a strong emphasis on governance to facilitate effective decision-making. The programme continues to undertake NISTA gateway reviews. The gateway 3 review in November 2024 and the gateway 4 review in March 2025 both returned amber ratings.","startDate":"2022-01-01","endDate":"2027-09-30","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 30/09/2027. This is primarily due to the following factors‚ The contract with the current supplier is set to expire on 12 May 2027, and due to commercial constraints and high likelihood of legal challenges from the ATS technology Marketplace, we are unable to extend the current ATS contract beyond the existing extension period in May 2027. The programme aims to begin onboarding customers to the new service in March 2026, with the objective of transferring all departments within the same year. This timeline will facilitate adequate offboarding from the current supplier and ensure a complete data transfer prior to exit. The planned end date also allows for some contingency and provides sufficient time for the handover to live service teams.","fyBaseline":3.54,"fyForecast":3.92,"fyVariance":10.73,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ Following the successful procurement of a supplier in August 2024, it became necessary to extend the standstill period to address questions and ensure full compliance with commercial processes. This extension resulted in a brief delay before the contract could be signed and the supplier onboarded. Consequently, this led to delays in recruiting and onboarding essential skills for the programme, resulting in a lower-than-anticipated resource cost for FY24/25. This underspend will be deferred to FY25/26 to accommodate an adjusted resourcing profile, allowing for the recruitment of additional skills to meet demand. Additionally, costs associated with Welsh Translation and modifications to the existing system have also been lower than forecast for this financial year. Although web hosting costs, costs for User Research, Accessibility Audit and IT Security testing fees have slightly exceeded initial projections, the programme remains on track to complete within its overall budget. Overall, the programme is positioned to meet the full period forecast outlined in the business case through to FY31/32.","wholeLifeCost":42.12,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 43 to 42. This is primarily due to the following factors‚ The Whole Life Costs reported in FY23/24-Q4 were derived from the Outline Business Case (OBC) approved in June 2023, whereas the figures for FY24/25-Q4 were based on the updated and approved Full Business Case (FBC). During the early stages of the procurement process, it became evident that the initial estimates for annual service charges had been overestimated, while the anticipated costs for the implementation phase had been underestimated. Additionally, forecasts for resource costs were revised downwards due to an improved understanding of the roles that the supplier would be providing. These changes were reflected in the updated FBC reported for FY24/25-Q4.","benefits":112.31,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) decreased from 167 to 112. This is primarily due to the following factors‚ The COAB approved the Government People Group Beta/ATS replacement Outline Business Case in June 2023, which outlined £162 million in monetizable benefits over seven years, spanning from FY23-24 to FY29-30. Due to Net present value terms and a 40% optimism bias the total benefits value dropped. At FBC, the monetizable benefits have been remodelled using a more detailed benefits analysis of recent data, actual supplier costs and conservative assumptions. Optimism bias is set to 20% on costs and 30% on benefits. This resulted in the decrease in forecast benefits to £112m.","themes":["Commercial & supply chain","Cost & funding","Workforce & capability","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The programme is on a positive trajectory. However, delivering it poses significant challenges due to the diverse range of customers and their complex needs. The…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 30/09/2027. This is primarily due to the following factors‚ The contract with the current supplier is set to expire on 12 May 2027, and due to commercial constraints and high likelihood of legal challenges from the ATS technology Marketplace, we are unable to extend the current ATS contract beyond the existing extension period in May 2027. The programme aims to begin onboarding customers to the new service in March 2026, with the objective of transferring all departments within the same year. This timeline will facilitate adequate offboarding from the current supplier and ensure a complete data transfer prior to exit. The planned end date also allows for some contingency and provides sufficient time for the handover to live service teams.","narrativeClaimKind":null,"outcomeStatus":"Outcome not established in annual CSV","outcomeEvidence":"The project has no record in the 2025-26 release. The annual CSV does not identify whether it delivered, closed early, was replaced or ceased to meet the portfolio criteria."},{"id":"DCMS_0107_2223-Q1","year":2025,"name":"Open Networks Programme","department":"DSIT","category":"Infrastructure and Construction","description":"The Open Networks Research and Development (R&D) Fund is the £250 million government supported programme to deliver upon the UK’s 5G Supply Chain Diversification Strategy. The Open Networks R&D Fund aims to accelerate the development and deployment of open interface architectures, such as Open RAN, and our ambition to: - Accelerate open-interface products and solutions - ensuring they are truly interoperable, performant, and sustainable – to support our long-term vision for a more open and innovative telecoms market; - Incentivise and de-risk accelerated deployment in the UK - to encourage and accelerate network operators to adopt and deploy open network solutions; - Develop an internationally recognised UK telecoms ecosystem - positioning the UK as a leading global market and focal point for research into open network technology.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at GREEN. This is primarily due to the following factors‚ Positive progress has been seen on final grant claims being submitted, and good attendance at closure events. Most projects remain scheduled for closure by 31 March 2025. A small amount of additional funding has been made available, and a small number of ONP projects have been given a short time extension, an extension to scope, a small amount of additional funding or a combination of these. The programme is due to undergo a Gate 5 Review in June 2025 to review the progress on closure, lessons learned and benefits realisation. Whilst most projects are coming to an end, telecoms and our future networks are as important as ever - we continue to focus on building strong relationships with industry and government stakeholders, through the short extension to the programme, ensuring continuous engagement and collaboration. Additionally, we will work on improving how we communicate the importance of telecoms to senior leaders and ministers, ensuring they understand the critical role it plays in enabling growth and productivity.","startDate":"2021-09-01","endDate":"2025-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2025. This is primarily due to the following factors‚ The majority of projects will close on 31 March 2025. A reduced team will remain in place for a number of months internally to ensure the closure of the programme is well controlled. The team has made a clear closure plan and has communicated positively with projects regarding closure activities and final report requirements. A small number of projects have been extended to ensure the projects can achieve their full range of benefits.","fyBaseline":98.4,"fyForecast":100.5,"fyVariance":2.13,"varianceNarrative":"The budget variance is less than or equal to 5%. The budget variance is less than 5%.","wholeLifeCost":325.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 325. This is primarily due to the following factors‚ The whole life baseline is the same as 24/25 due to the programme being funded by the same multi-year business case. Compared to financial year 23/24-Q4, the programme's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 325.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ Monetised benefits are not captured due to the nature of the programme (R&D funding). Similarly, the timelines for projects makes it difficult to collect monetised benefits, and many qualitative and technical benefits are being collected. In addition, project-level benefits differ from the overarching Business Case benefits.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at GREEN. This is primarily due to the following factors‚ Positive progress has been seen on final grant claims being submitted, and good attendance at closure events. Most projects remain scheduled for closure by 31 March…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2025. This is primarily due to the following factors‚ The majority of projects will close on 31 March 2025. A reduced team will remain in place for a number of months internally to ensure the closure of the programme is well controlled. The team has made a clear closure plan and has communicated positively with projects regarding closure activities and final report requirements. A small number of projects have been extended to ensure the projects can achieve their full range of benefits.","narrativeClaimKind":null,"outcomeStatus":"Outcome not established in annual CSV","outcomeEvidence":"The project has no record in the 2025-26 release. The annual CSV does not identify whether it delivered, closed early, was replaced or ceased to meet the portfolio criteria."},{"id":"DEFRA_0016_2122-Q1","year":2025,"name":"BIOSECURITY, BORDERS AND TRADE PROGRAMME","department":"DEFRA","category":"Government Transformation and Service Delivery","description":"The Defra Biosecurity, Borders and Trade Programme (BBTP) vision is to deliver a world-class biosecurity capability which protects health, encourages prosperity and enables security for a global UK. The programme is delivering the key infrastructure, systems, services, operations, capabilities, and legislative changes required to enable the introduction of new controls for goods to and from the EU.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The programme has formally closed with transition and handover successfully complete of the BAU operational delivery unit to the Animal and Plant Health Agency (APHA) and the residual project delivery has been merged with the Northern Ireland Directorate as part of the newly formed single trade delivery programme; Northern Ireland Biosecurity and Trade Programme (NIBTP). At closure the programme has delivered the core elements of the BTOM and now has a network of designated BCPs, new digital services for managing imports, trained inspection staff operating at ports, policy / legislation / processes in place, and has conducted extensive work with stakeholders to embed BTOM controls. The controls put in place are being used to target biosecurity risks based on commodity / country risk profiling, and the value has been demonstrated by robust controls being swiftly introduced in response to EU FMD outbreaks. An IPA Gate 5 review was undertaken in February with an AMBER outcome. The Amber rating relates to uncertainty regarding future BTOM requirements linked to EU reset, with all programme closure activity being viewed as green. The review team commended the programme for the successful delivery to date and highlighted the wider uncertainty around EU reset and alignment and the potential impact for the BTOM. All six recommendations assigned to the programme have been actioned and closed. The programme received Defra Investment Committee approval to formally close the programme in May 2025 and has been formally offboarded from GMPP. The programme has submitted a Spending Review (SR) Phase 2 bid for ongoing borders RDEL and CDEL requirements for HMT review.","startDate":"2021-01-01","endDate":"2025-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2025. This is primarily due to the following factors‚ The programme closed on 31 March 2025 as scheduled.","fyBaseline":122.23,"fyForecast":104.23,"fyVariance":14.73,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The programme was delivered within budget for 24/25 with a slight variance in RDEL spend due to unexpected costs. BBTP has prioritised activity in-year to ensure core BTOM controls were implemented, and efficiency savings have been secured to support the broader departmental position.","wholeLifeCost":null,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 902 to 820. This is primarily due to the following factors‚ The programme’s whole-life cost is £820m.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ The benefits of the programme are primarily qualitative in nature, supported by quantitative analysis and data that inform the assessment of each metric. The principal benefit of the programme, along with the Border Target Operating Model, lies in safeguarding the nation’s biosecurity and ensuring HMG’s compliance with international trade obligations. This protection is critical in mitigating the risk of severe economic disruption caused by biosecurity breaches. The benefits are largely framed as cost avoidance, achieved by preventing the potential economic consequences of a disease outbreak.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The programme has formally closed with transition and handover successfully complete of the BAU operational delivery unit to the Animal and Plant Health Agency (APHA)…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2025. This is primarily due to the following factors‚ The programme closed on 31 March 2025 as scheduled.","narrativeClaimKind":null,"outcomeStatus":"Outcome not established in annual CSV","outcomeEvidence":"The project has no record in the 2025-26 release. The annual CSV does not identify whether it delivered, closed early, was replaced or ceased to meet the portfolio criteria."},{"id":"DESNZ_0295_2324-Q3","year":2025,"name":"Home Upgrade Grant and Local Authority Delivery (HULA) schemes","department":"DESNZ","category":"Government Transformation and Service Delivery","description":"The HULA Programme comprises Local Authority Delivery and Home Upgrade Grant. The Local Authority Delivery Scheme (LAD) launched in August 2020 and was delivered over the course of three phases. The primary purpose of the funding was to support low-income households living in energy inefficient homes in England with energy efficiency and clean heating upgrades, whilst supporting economic resilience and a green recovery. Phase 1 allocated £200m in grants to over 136 Local Authorities with a managed closedown of projects from March 2022 to end of September 2022. Phase 2 allocated £300m to the five Local Net Zero Hubs, who worked with their regional Local Authorities to continue to deliver energy efficiency upgrades to homes until the end of September 2022. Together LAD phases 1 & 2 delivered upgrades to over 38,000 homes. Phase 3 made almost £287m of extra funding available to Local Authorities, under the Sustainable Warmth competition. Delivery commenced in early 2022 and ended in September 2023. The Home Upgrade Grant (HUG) provides energy efficiency upgrades and low-carbon heating measures to low-income households living in the in the worst-performing, off-gas-grid homes (those rated Energy Performance Certificate (EPC) Band D, E, F and G) in England to tackle fuel poverty and make progress towards net zero 2050. Unlike measure-focused government schemes such as the Great British Insulation Scheme or Boiler Upgrade Scheme, HUG provides whole house retrofit to ensure low-income, off-gas-grid homes receive tailored energy efficient upgrades, treating the entire property. Phase 1 of HUG was worth £218 million. Delivery commenced in early 2022 and ran until September 2023. Phase 2 of HUG was allocated up to £315m. It began delivery in April 2023 and concluded in March 2025, with a small number of households completed under ‘extenuating circumstances’ in May 2025. It is forecast that HUG2 will deliver 11,000 properties, spending £227m of its allocated budget (compared with its Mid-Point Review (MPR) forecast in April 2024 of £217m and 8,721 homes).","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ HULA completed delivery of its LAD schemes in 2023. LAD Phases 1 & 2, which were schemes for retrofit delivery through Local Authorities, concluded with 38,646 homes treated out of an original business case target of 55,000 and received an IPA green rating at closure. LAD Phase 3 completed delivery in September 2023, spending £221m of the £286.8m allocated to Local Authorities (LA) between December 2021 and January 2022. Several factors, including the high degree of optimism bias within LA forecasts, challenges identifying a sufficient pipeline of eligible homes, drop-out rates, cost-cap limitations and short delivery windows led to under-delivery of the LAD scheme, which was also affected by issues relating to supply chain capacity and access to properties resulting from the Covid19 Pandemic. Delivery of HULA’s HUG schemes will cease in September 2025 with the closure of HUG2. HUG1 completed delivery in September 2023, spending £61m of the £218.6m allocated to Local Authorities between Jan-April 2022. Under-delivery of scheme was due to several factors identified through monitoring and evaluation, including organisation level (expertise and capacity of each LA / consortium lead and their delivery partners), project level (ongoing optimism bias within LA forecasts, the time needed for LAs to procure and contract suppliers, the target measure mix’s alignment with local supply chains), and local external factors (customer appetite for measures offered, incidence of qualifying households, some off-gas grid housing stock being unsuitable for measures, and increased difficulty in delivering installations in rural / lower density areas). LAD3 and HUG1 (packaged together as Sustainable Warmth) received an amber/ green rating from IPA at closure. HUG2 has completed 24 months of delivery, issuing £240m against a budget allocation of £315m (GMPP baseline) and a Mid-Point Review forecast of £218m. HUG2, which is delivered via a Delivery Agent and Partner, has faced delivery challenges including identifying properties compliant with restrictive policy criteria (which included limits on private rented sector landlords and a 60% rural ringfence). Performance improved significantly in 24/25 following implementation of a ‘Maximising Delivery Strategy’. Delivery of over 11,000 homes is forecast by scheme-end, against a GMPP baseline of 12,602 and an MPR forecast (April 2024) of 8,721.","startDate":"2020-03-01","endDate":"2025-09-01","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2025 to 01/09/2025. This is primarily due to the following factors: Delivery ended on 30 March 2025. HUG2 project closure activity is underway with the final IPA review expected in September 2025. HULA will exit GMPP with HUG2 at this time and therefore the Q2 report (data date end September 2024 will be the last)","fyBaseline":163.35,"fyForecast":168.04,"fyVariance":2.87,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":1307.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 1307. This is primarily due to the following factors‚ HULA has not re-baselined its Whole Life Cost since the last IPA Annual Report.","benefits":5042.82,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 4782 to 5042. This is primarily due to the following factors‚ The update of the OBR inflation forecast in Q2 24/25, making baseline nominal benefits larger.","themes":["Delivery & schedule","Cost & funding","Commercial & supply chain","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ HULA completed delivery of its LAD schemes in 2023. LAD Phases 1 & 2, which were schemes for retrofit delivery through Local Authorities, concluded with 38,646 homes…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2025 to 01/09/2025. This is primarily due to the following factors: Delivery ended on 30 March 2025. HUG2 project closure activity is underway with the final IPA review expected in September 2025. HULA will exit GMPP with HUG2 at this time and therefore the Q2 report (data date end September 2024 will be the last)","narrativeClaimKind":null,"outcomeStatus":"Outcome not established in annual CSV","outcomeEvidence":"The project has no record in the 2025-26 release. The annual CSV does not identify whether it delivered, closed early, was replaced or ceased to meet the portfolio criteria."},{"id":"DFE_0014_2021-Q2","year":2025,"name":"TEACHER DEVELOPMENT REFORM PROGRAMME","department":"DfE","category":"Government Transformation and Service Delivery","description":"The Teacher Development Reform (TDR) Programme is part of the wider reforms to Teacher Continual Professional Development (CPD) set out in the DfE Teacher Recruitment and Retention Strategy and Chapter 1 of the DfE 'Opportunity for all: strong schools with great teachers for your child’ White Paper published in March 2022. The TDR Programme includes the Early Career Framework (ECF), National Professional Qualifications (NPQ) and National Institute of Teaching (NIoT) projects. These innovations are part of the investment in our teachers and leaders which include a funded two-year induction programme for Early Career Teachers (ECTs) and funded training support and time off timetable for their mentors and Specialist and Leadership NPQs and reforms to our existing Leadership NPQs. Alongside this, The NIoT aims to become England’s flagship teacher training and development provider and will offer exemplary delivery of Initial Teacher Training, ECF and NPQs. It will also draw on and produce cutting-edge research and disseminate best practice to further improve the quality of teacher training nationwide. The driving force behind these reforms is to ensure an excellent teaching profession and ultimately improve pupil outcomes through the Departmental objective to improve teacher quality.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at GREEN. This is primarily due to the following factors, The programme remains on track and is rated Green to reflect our most recent NISTA gateway review, and the closure of key issues on achievement of recruitment targets on the NPQs. Risks remain around securing sufficient funding for providers to remain in market for 2025 and beyond. This risk is being mitigated through a number of management options including (but not limited to) ensuring the future NPQ cohorts are included in the departments spending review, and working with the provider market to assess different options for the future delivery of NPQs, that might secure better economies of scale. The ECF procurement outcomes were announced in January 2025 as part of a package of teacher development updates. The programme is entering its final stages of closure culminating in a NISTA (formerly IPA) Gate 5 review planned for June 2025.","startDate":"2018-11-01","endDate":null,"scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 12/02/2026. This is primarily due to the following factors, The programme is entering its final stages of closure culminating in a NISTA Gate 5 review planned for June 2025, with an expected closure date to follow once a Gate 5 review is complete.","fyBaseline":209.23,"fyForecast":188.39,"fyVariance":9.96,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the programme comprising demand led spend. This has resulted in an underspend against baseline expectation in FY24/25.","wholeLifeCost":940.46,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 750 to 940. This is primarily due to the following factors, The previous baseline forecast concluded at the end of FY24/25. Following business planning activity, forecasts have been updated to incorporate the new budgets.","benefits":169.28,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from £0m to £169m. This is primarily due to the following factors, TDR programme reported benefits of £117m (actuals) in FY23/24 and £169m (actuals) in FY24/25-Q4. The benefits value increased between the two years, primarily as there were additional savings from the area of Teaching School Hubs and a reduction in teacher wastage. There was an error in reporting for the previous financial year. The figure for monetised benefits in FY23/24 should have been £117.5m","themes":["Cost & funding","Governance & assurance","Commercial & supply chain","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at GREEN. This is primarily due to the following factors, The programme remains on track and is rated Green to reflect our most recent NISTA gateway review, and the closure of key issues on achievement of recruitment targets…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 12/02/2026. This is primarily due to the following factors, The programme is entering its final stages of closure culminating in a NISTA Gate 5 review planned for June 2025, with an expected closure date to follow once a Gate 5 review is complete.","narrativeClaimKind":null,"outcomeStatus":"Outcome not established in annual CSV","outcomeEvidence":"The project has no record in the 2025-26 release. The annual CSV does not identify whether it delivered, closed early, was replaced or ceased to meet the portfolio criteria."},{"id":"DFE_0020_2021-Q4","year":2025,"name":"NATIONAL TUTORING PROGRAMME","department":"DfE","category":"Government Transformation and Service Delivery","description":"The National Tutoring Programme (NTP) is a multi-year programme, with the key objective of sustaining a high-quality tutoring market and embedding a culture of schools using tutoring support for their pupils. The programme was established as part of the Department for Education’s Recovery Strategy which aimed to reduce the extent of lost learning caused by disruption from COVID-19","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at GREEN. This is primarily due to the following factors‚ Although the programme closed eight months after the end of NTP delivery in schools, its objectives were met, and this period was largely required for administrative financial reasons.","startDate":"2020-07-01","endDate":"2025-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/07/2024 to 31/03/2025. This is primarily due to the following factors‚ The original project end date reflected the end of the NTP delivery in schools. In order to claw back unused funds from schools and close down, the project continued until 31/03/25.","fyBaseline":66.1,"fyForecast":69.5,"fyVariance":5.14,"varianceNarrative":"The budget variance is less than or equal to 5%. No comment","wholeLifeCost":1125.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 1125. This is primarily due to the following factors‚ This is unchanged from last year.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ This is unchanged from last year – no monetised benefits have been calculated for this programme.","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at GREEN. This is primarily due to the following factors‚ Although the programme closed eight months after the end of NTP delivery in schools, its objectives were met, and this period was largely required for administrative…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/07/2024 to 31/03/2025. This is primarily due to the following factors‚ The original project end date reflected the end of the NTP delivery in schools. In order to claw back unused funds from schools and close down, the project continued until 31/03/25.","narrativeClaimKind":null,"outcomeStatus":"Outcome not established in annual CSV","outcomeEvidence":"The project has no record in the 2025-26 release. The annual CSV does not identify whether it delivered, closed early, was replaced or ceased to meet the portfolio criteria."},{"id":"DFE_0173_2223-Q2","year":2025,"name":"HIGHER TECHNICAL EDUCATION","department":"DfE","category":"Government Transformation and Service Delivery","description":"The decision was made that HTE programme will have delivered the majority of funded activity in its programme business case (PBC) by March 2025, and it is therefore appropriate to move towards to closure of the programme. Instead, resources will be redeployed efficiently, allowing the Department to pivot quickly, and to work in a more agile way, as the new ministerial team's future priorities and ambitions for Level 4/5 and HTQs are emerging. This was agreed with DfE senior leadership, Skills Portfolio, DfE Major Projects, NISTA (formerly IPA), and the HTE Delivery Board. Preparations for programme closure began in early 2025. There had been no response from the sector during the reporting period in response to the early closure of the programme. The uncertainty of the impacts resulting from the early closure influenced the rating for this quarter. During this quarter, the programme was still live and in delivery but moving quickly to prepare for the Gate 5 review, planned for mid-May 2025 (the final delivery confidence rating from that review was green) There has been close working with the Major Projects Team and NISTA to plan for and assemble all the evidence required for closure. In particular, significant work was done in this quarter to shore up the benefits realisation and monitoring plans, reflecting a refresh in programme trajectories, and to review risks, issues, and interdependencies with key stakeholders, ensuring appropriate and sufficient governance would be in place after transition to business-as-usual.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The decision was made that HTE programme will have delivered the majority of funded activity in its programme business case (PBC) by March 2025, and it is therefore appropriate to move towards to closure of the programme. Instead, resources will be redeployed efficiently, allowing the Department to pivot quickly, and to work in a more agile way, as the new ministerial team's future priorities and ambitions for Level 4/5 and HTQs are emerging. This was agreed with DfE senior leadership, Skills Portfolio, DfE Major Projects, NISTA (formerly IPA), and the HTE Delivery Board. Preparations for programme closure began in early 2025. There had been no response from the sector during the reporting period in response to the early closure of the programme. The uncertainty of the impacts resulting from the early closure influenced the rating for this quarter. During this quarter, the programme was still live and in delivery but moving quickly to prepare for the Gate 5 review, planned for mid-May 2025 (the final delivery confidence rating from that review was GREEN)","startDate":"2019-10-01","endDate":null,"scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 decreased from 01/09/2027 to 30/05/2025. This is primarily due to the following factors‚ The programme was set to deliver all funded activity in the programme business case by March 2025. A change in Government meant that the previous policy levers and ministerial ambitions were no longer in place. After the first Spending Review of the new Government, more funds were not made available for new activity not included in the existing business case. Subsequently, it was appropriate to move to close HTE as a programme and redeploy resource to support wider and ongoing work to drive up quality in provision, demand and accessibility at Levels 4 and 5.","fyBaseline":27.9,"fyForecast":4.7,"fyVariance":83.15,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The reduction in budgets is primarily due to the decision not to proceed with the rollout of the Skills Injection Fund 3, as originally planned. This change was formally communicated to our providers in February 2025. Additionally, there were clawbacks from both the Higher Technical Education Growth Fund and Skills Injection Fund 1. These clawbacks were triggered by underperformance against predicted learner numbers and were subject to the performance recovery clause. There was also further clawback from the Higher Technical Education Skills Injection Fund 2, where some providers had not fully spent their allocated funds.","wholeLifeCost":176.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 176. This is primarily due to the following factors‚ This is unchanged from last year.","benefits":null,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ This is unchanged from last year – no monetised benefits have been calculated for this programme.","themes":["Approvals & decisions","Cost & funding","Workforce & capability","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The decision was made that HTE programme will have delivered the majority of funded activity in its programme business case (PBC) by March 2025, and it is therefore…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 decreased from 01/09/2027 to 30/05/2025. This is primarily due to the following factors‚ The programme was set to deliver all funded activity in the programme business case by March 2025. A change in Government meant that the previous policy levers and ministerial ambitions were no longer in place. After the first Spending Review of the new Government, more funds were not made available for new activity not included in the existing business case. Subsequently, it was appropriate to move to close HTE as a programme and redeploy resource to support wider and ongoing work to drive up quality in provision, demand and accessibility at Levels 4 and 5.","narrativeClaimKind":null,"outcomeStatus":"Outcome not established in annual CSV","outcomeEvidence":"The project has no record in the 2025-26 release. The annual CSV does not identify whether it delivered, closed early, was replaced or ceased to meet the portfolio criteria."},{"id":"DFT_0020_2122-Q2","year":2025,"name":"RAIL SECTOR TRANSFORMATION PROGRAMME","department":"DfT","category":"Government Transformation and Service Delivery","description":"The Railways Bill, which will be introduced later this session, will enable the biggest overhaul of the rail sector in a generation. It will enable the establishment of GBR as a new ‘directing mind’ for the railways, unifying track and train under a single public body to deliver better services for passengers and freight customers, and better value for money for taxpayers. GBR will have the tools and operational independence it needs to plan and run the rail system on a long-term basis to deliver for passengers. GBR will make long term capacity allocation, planning and investment decisions to give greater certainty to rail freight operators, open access, and the wider supply chain. The legislation will establish a powerful new passenger watchdog to champion improvements in rail services for passengers. It will protect and advocate for passengers’ interests and rights, offer advice, address unresolved passenger complaints and independently monitor service performance reporting on its findings publicly and transparently.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER. This is due to‚ DfT agree with the amber rating. The Railways Bill, which will enable the establishment of Great British Railways is planned to be introduced in the first session of Parliament. The legislation consultation was published on 18 February and closed on 15 April. Significant stakeholder engagement has occurred and to raise awareness of the transformation and build consensus ahead of the Government publishing the consultation response. GBR is expected to be established around 12 months after the bill receives Royal Assent.","startDate":"2024-09-30","endDate":null,"scheduleNarrative":"The project's end-date at 24/25-Q4 is exempted. In February 2025, the government’s consultation on the Railways Bill outlined plans to set up GBR as a new public body, responsible for rail services and infrastructure. The Railways Bill is due to go before Parliament this parliamentary session. GBR is expected to be established round 12 months after the bill receives Royal Assent. Before the bill becomes law, leaders of Network Rail, DfT Operator Limited (DFTO), and the Department for Transport’s (DfT’s) Rail Services Group are working together, as Shadow Great British Railways (SGBR). SGBR will start to realise the benefits of rail reform to passengers and freight ahead of the formal creation of GBR.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","wholeLifeCost":null,"costNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","benefits":null,"benefitsNarrative":"The GMPP project is still at the planning stage (Pre-SOC or equivalent) and is not yet in a position to provide cost/schedule information","themes":["Delivery & schedule","Cost & funding"],"evidenceExcerpt":"The Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 is AMBER. This is due to‚ DfT agree with the amber rating. The Railways Bill, which will enable the establishment of Great British Railways is planned to be introduced in the first session of Parliament. The legislation consultation was published on 18 February and…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"The project's end-date at 24/25-Q4 is exempted. In February 2025, the government’s consultation on the Railways Bill outlined plans to set up GBR as a new public body, responsible for rail services and infrastructure. The Railways Bill is due to go before Parliament this parliamentary session. GBR is expected to be established round 12 months after the bill receives Royal Assent. Before the bill becomes law, leaders of Network Rail, DfT Operator Limited (DFTO), and the Department for Transport’s (DfT’s) Rail Services Group are working together, as Shadow Great British Railways (SGBR). SGBR will start to realise the benefits of rail reform to passengers and freight ahead of the formal creation of GBR.","narrativeClaimKind":null,"outcomeStatus":"Outcome not established in annual CSV","outcomeEvidence":"The project has no record in the 2025-26 release. The annual CSV does not identify whether it delivered, closed early, was replaced or ceased to meet the portfolio criteria."},{"id":"DFT_0034_1920-Q2","year":2025,"name":"A12 CHELMSFORD TO A120 WIDENING","department":"DfT","category":"Infrastructure and Construction","description":"As announced in the Roads Investment Strategy 2, the scope includes: Widening the A12 to three lanes between junction 19 (north of Chelmsford) and junction 25 (A120 interchange)","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Though the Court of Appeal has dismissed the legal challenge to the decision to grant the A12 Chelmsford to A120 widening scheme a Development Consent Order and the legal process is now over, the scheme’s progress has been delayed. The A12 widening scheme, alongside other future road projects, will be considered as part of the government’s Spending Review.","startDate":"2015-04-01","endDate":null,"scheduleNarrative":"Though the Court of Appeal has dismissed the legal challenge to the decision to grant the A12 Chelmsford to A120 widening scheme a Development Consent Order and the legal process is now over, the scheme’s progress has been delayed. The A12 widening scheme, alongside other future road projects, will be considered as part of the government’s Spending Review.","fyBaseline":40.5,"fyForecast":12.74,"fyVariance":68.54,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ Though the Court of Appeal has dismissed the legal challenge to the decision to grant the A12 Chelmsford to A120 widening scheme a Development Consent Order and the legal process is now over, the scheme’s progress has been delayed. The A12 widening scheme, alongside other future road projects, will be considered as part of the government’s Spending Review.","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":null,"benefitsNarrative":"Section 43 - Commercial interests","themes":["Approvals & decisions","Delivery & schedule","Governance & assurance","Cost & funding"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Though the Court of Appeal has dismissed the legal challenge to the decision to grant the A12 Chelmsford to A120 widening scheme a Development Consent Order and the…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Though the Court of Appeal has dismissed the legal challenge to the decision to grant the A12 Chelmsford to A120 widening scheme a Development Consent Order and the legal process is now over, the scheme’s progress has been delayed. The A12 widening scheme, alongside other future road projects, will be considered as part of the government’s Spending Review.","narrativeClaimKind":null,"outcomeStatus":"Outcome not established in annual CSV","outcomeEvidence":"The project has no record in the 2025-26 release. The annual CSV does not identify whether it delivered, closed early, was replaced or ceased to meet the portfolio criteria."},{"id":"DFT_0039_2122-Q3","year":2025,"name":"Midland Main Line Electrification (MMLE) Programme","department":"DfT","category":"Infrastructure and Construction","description":"Electrification of the Midland Main Line from Wigston to Sheffield and Nottingham that will enable the replacement of diesel traction with electric or bimode electric trains delivering environmental improvements and operational cost savings.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The progression of electrification will be dependent on the development of a robust business case that sets out a clear narrative on the rationale to progress the programme. Successful delivery of the programme remains feasible although funding is subject to the outcome of the 2025 Spending Review.","startDate":"2022-01-21","endDate":"2032-12-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/12/2032. This is primarily due to the following factors‚ If MMLE is funded in the 2025 Spending Review, the schedule will be reviewed by Network Rail, and milestones rebaselined as required. It is not known if this will result in a change to the programme end date.","fyBaseline":41.0,"fyForecast":31.0,"fyVariance":24.39,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The forecast costs reflect the latest assured cost plan received from Network Rail, compared to the costs approved in the OBC. As the investment decision for the FBC has been delayed due to Spending Review uncertainty, the approved costs and forecast costs have not been updated.","wholeLifeCost":1468.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 1468. This is primarily due to the following factors‚ Due to changes in the procurement timeline and Spending Review uncertainty, the planned investment decision was deferred to 25/26 and the FBC was not finalised and approved during 24/25.","benefits":2599.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 2599. This is primarily due to the following factors‚ Due to changes in the procurement timeline and Spending Review uncertainty, the planned investment decision was deferred to 25/26 and the FBC was not finalised and approved during 24/25.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ The progression of electrification will be dependent on the development of a robust business case that sets out a clear narrative on the rationale to progress the…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/12/2032. This is primarily due to the following factors‚ If MMLE is funded in the 2025 Spending Review, the schedule will be reviewed by Network Rail, and milestones rebaselined as required. It is not known if this will result in a change to the programme end date.","narrativeClaimKind":null,"outcomeStatus":"Outcome not established in annual CSV","outcomeEvidence":"The project has no record in the 2025-26 release. The annual CSV does not identify whether it delivered, closed early, was replaced or ceased to meet the portfolio criteria."},{"id":"DFT_0054_2122-Q1","year":2025,"name":"RAPID CHARGING FUND","department":"DfT","category":"Infrastructure and Construction","description":"The Rapid Charging Fund will upgrade power capacity on the Strategic Road Network where it is not commercially viable to do so, in order to allow the private sector to expand ultra rapid electric vehicle charging ahead of need.","ipaDca":null,"sroDca":null,"deliveryConfidence":null,"deliveryConfidenceSource":null,"commentary":"Section 22 - Information intended for future publication","startDate":"2020-11-25","endDate":"2028-04-30","scheduleNarrative":"Section 22 - Information intended for future publication","fyBaseline":33.0,"fyForecast":4.5,"fyVariance":86.36,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ Assessment of Rapid Charging Fund pilot applications and engagement with applicants continued throughout 2024. The reduction in spending compared to the baseline occurred because no grant awards were made before the end of the 2024/25 financial year.","wholeLifeCost":null,"costNarrative":"Section 35 - Formulation of government policy","benefits":null,"benefitsNarrative":"Section 35 - Formulation of government policy","themes":["Cost & funding"],"evidenceExcerpt":"Section 22 - Information intended for future publication Section 22 - Information intended for future publication","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Section 22 - Information intended for future publication","narrativeClaimKind":null,"outcomeStatus":"Outcome not established in annual CSV","outcomeEvidence":"The project has no record in the 2025-26 release. The annual CSV does not identify whether it delivered, closed early, was replaced or ceased to meet the portfolio criteria."},{"id":"DHSC_0096_2122-Q4","year":2025,"name":"DIGITISING SOCIAL CARE","department":"DHSC","category":"Government Transformation and Service Delivery","description":"The government is harnessing digital technology to transform adult social care: helping people to stay independent in their homes, joining up services and improving the quality of care provided. Over the last 3 years, the Department of Health and Social Care and NHS England have made significant progress to digitise the adult social care sector, through the Digitising Social Care (DiSC) programme. Digital social care records have been implemented by 78% of CQC care providers (rolling average from February 2025), improving the quality, safety and personalisation of care. The programme has done the foundational work on care technologies through testing, scaling and evaluating technologies that help people live independently in their own homes for longer.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors‚ the improved coverage of the programme: as of Feb 2025, 78% of CQC registered adult social care providers have a digital social care record, covering 87% of people receiving CQC registered adult social care services. The programme forecasts to achieve 80% in the coming months.","startDate":"2021-04-01","endDate":"2025-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2025. This is primarily due to the following factors‚ The programme is forecasting to achieve 80% adoption in the coming months, therefore the programme is exiting the GMPP and standing up to two successor programmes to continue building on progress and sustainability.","fyBaseline":62.0,"fyForecast":46.0,"fyVariance":25.81,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The programme descoped activity to focus on core objectives.","wholeLifeCost":598.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 598. This is primarily due to the following factors‚ The whole life cost were unchanged from the original economic modelling. They reflect both government costs and cost borne by care providers maintaining and sustaining contracts.","benefits":2952.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 2952. This is primarily due to the following factors‚ The programme validated the original benefit assumption through a time and motion study and identified additional productivity benefits.","themes":["Cost & funding","Delivery & schedule","Technical & integration"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors‚ the improved coverage of the programme: as of Feb 2025, 78% of CQC registered adult social care providers have a digital social care record, covering 87%…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2025. This is primarily due to the following factors‚ The programme is forecasting to achieve 80% adoption in the coming months, therefore the programme is exiting the GMPP and standing up to two successor programmes to continue building on progress and sustainability.","narrativeClaimKind":null,"outcomeStatus":"Outcome not established in annual CSV","outcomeEvidence":"The project has no record in the 2025-26 release. The annual CSV does not identify whether it delivered, closed early, was replaced or ceased to meet the portfolio criteria."},{"id":"DHSC_0253_2324-Q1","year":2025,"name":"DATA FOR RESEARCH AND DEVELOPMENT (R&D)","department":"DHSC","category":"Government Transformation and Service Delivery","description":"The Programme's vision is to by 2025, have a world leading NHS-wide health data research infrastructure that enhances patient care, sustains the NHS and supports innovation, while benefiting the economy through attracting life sciences to work in the UK","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ An action plan was put in place to address recommendations from the last IPA review, the Programme continues to progress against its key high-level activities, drawn from the Gateway review recommendations, Delivery activity for this phase of the Programme is drawing to a close, with focus now looking ahead to 25/26 and transitioning towards a Central Management Entity.","startDate":"2022-01-01","endDate":"2025-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2025. This is primarily due to the following factors‚ ‚ the programme has delivered in line with the timescales in the business case and is due to close before the start of the current GMPP reporting cycle.","fyBaseline":82.91,"fyForecast":75.85,"fyVariance":8.52,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ underspend from NHSE SDE and NHS Digitrials that flowed back to our budget late in the financial year and wider portfolio reprioritisation, which meant some planned expenses did not materialise.","wholeLifeCost":206.34,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 191 to 206. This is primarily due to the following factors‚ an increase in pass-through funding from additional funders to providers that was facilitated by the Data for R&D Programme. This increase in baseline was covered by the Programme Business Case Contingency and Optimism Bias.","benefits":1484.98,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) decreased from 1485 to 1484. This is primarily due to the following factors‚ Benefit reprofiling based on changes in spending and the funding changes for FY 24/25.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ An action plan was put in place to address recommendations from the last IPA review, the Programme continues to progress against its key high-level activities, drawn…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2025. This is primarily due to the following factors‚ ‚ the programme has delivered in line with the timescales in the business case and is due to close before the start of the current GMPP reporting cycle.","narrativeClaimKind":null,"outcomeStatus":"Outcome not established in annual CSV","outcomeEvidence":"The project has no record in the 2025-26 release. The annual CSV does not identify whether it delivered, closed early, was replaced or ceased to meet the portfolio criteria."},{"id":"DWP_0008_2122-Q2","year":2025,"name":"BUILDING SAFETY REGULATOR","department":"DWP","category":"Government Transformation and Service Delivery","description":"The mandate for a new regulatory model was set out in the Building Safety Act, taking forward the Government’s commitment to fundamental reform of the building safety system: to learn the lessons from the Grenfell Tower fire and remedy the systemic issues identified by Dame Judith Hackitt in her Independent Review of Building Regulations and Fire Safety, published in May 2018. The key objectives of the programme were to:- Drive improvements in regulation of high-rise residential and other buildings in scope of a new, enhanced regulatory regime (HRB function); Establish professional registers and competence standards for registered building inspectors and registered building control approvers (RBCAs, formerly known as Approved Inspectors); Encourage improvements in industry, professionals and tradespeople and building control competence and organisational capability across all buildings (Competence Function); and Improving regulatory oversight of all buildings (Oversight Function). • This is being delivered by HSE (Health and Safety Executive)","ipaDca":"Green","sroDca":null,"deliveryConfidence":"Green","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors‚ The programme achieved all major and legislative milestones as planned delivery to both time and under budget. The transition in to HSE support teams concluded and the programme achieved a GREEN rating from the Gate 5 Operations Review and Benefits Realisation independent assurance review in February 2025.","startDate":"2021-03-01","endDate":null,"scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2025. This is primarily due to the following factors‚ When the project was initially approved, the Building Safety Regulator was scheduled to become operational in FY24-25. This milestone was successfully achieved, and the project transitioned to operational status as planned. This success was made possible by the hard work and commitment of everyone involved, whose dedication ensured the timetable was met.","fyBaseline":909.74,"fyForecast":824.74,"fyVariance":9.34,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The project's costs have been periodically reviewed and influenced by several factors, including resource availability and capacity constraints, both of which have affected the level of cost-recoverable income.","wholeLifeCost":null,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 910 to 909. This is primarily due to the following factors‚ Resource availability and capacity restraints affected spend (both revenue and capital).","benefits":null,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 3601. This is primarily due to the following factors‚ Long term benefits will be realised over multiple decades, evaluation appraisal has now commenced.","themes":["Cost & funding","Delivery & schedule","Workforce & capability","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors‚ The programme achieved all major and legislative milestones as planned delivery to both time and under budget. The transition in to HSE support teams…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2025. This is primarily due to the following factors‚ When the project was initially approved, the Building Safety Regulator was scheduled to become operational in FY24-25. This milestone was successfully achieved, and the project transitioned to operational status as planned. This success was made possible by the hard work and commitment of everyone involved, whose dedication ensured the timetable was met.","narrativeClaimKind":null,"outcomeStatus":"Outcome not established in annual CSV","outcomeEvidence":"The project has no record in the 2025-26 release. The annual CSV does not identify whether it delivered, closed early, was replaced or ceased to meet the portfolio criteria."},{"id":"DWP_0009_1112-Q1","year":2025,"name":"CONTINUING THE MOVE TO UNIVERSAL CREDIT","department":"DWP","category":"Government Transformation and Service Delivery","description":"Universal Credit replaces six separate benefits and tax credits for working age people, bringing together in and out of work systems into one, to make work pay. When fully rolled out it is expected that around 6.5 million households will benefit from Universal Credit. It was legislated for in 2012-13 with national rollout of the UC Full Service completed in December 2018 and scheduled to complete migration of remaining legacy claimants including Employment Support Allowance (ESA) and ESA+ Housing Benefit (HB) claimants by March 2026. UC Programme formally closed 31 March 2025 with oversight of the continued safe delivery of UC transitioning to the newly formed Working Age Services Directorate and accountability for completing all migrations by March 2026 transferring to Director General, Jobs and Careers Service.","ipaDca":"Green","sroDca":null,"deliveryConfidence":"Green","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors. The overall Delivery Confidence Assessment Rating remains Green, reflecting the completion of the 2024/25 migration plan enabling the successful closure of Tax Credits, the positive and sustained progress with exceeding Employment and Support Allowance (ESA) and ESA & Housing Benefit (HB) monthly profiles and agreement to an accelerated profile to support completing all migrations by March 2026. Given the excellent progress, and supported by the IPA Gate 5 Assurance GREEN confidence rating, the Programme was formally closed on 31 March 2025 with oversight of the continued safe delivery of UC transitioning to the newly formed Working Age Services Directorate.","startDate":"2011-11-17","endDate":null,"scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2025. This is primarily due to the following factors. Given the continued excellent progress, including enabling the successful closure of Tax Credits and sustained progress with exceeding remaining monthly profiles, the Programme was formally closed as planned on 31 March 2025.","fyBaseline":2174.07,"fyForecast":2128.51,"fyVariance":2.1,"varianceNarrative":"The budget variance is less than or equal to 5%. No additional narrative as the UC project was within the +/- 5% in year variance tolerance","wholeLifeCost":17305.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 17305. This is primarily due to the following factors, Latest HM Treasury approval point was set in the Full Business Case in December 2022. There has been no variation or amended from this viewpoint","benefits":70638.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 70638. This is primarily due to the following factors, Latest HM Treasury approval point was set in the Full Business Case in December 2022. There has been no variation or amended from this viewpoint","themes":["Delivery & schedule","Cost & funding","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors. The overall Delivery Confidence Assessment Rating remains Green, reflecting the completion of the 2024/25 migration plan enabling the successful closure…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2025. This is primarily due to the following factors. Given the continued excellent progress, including enabling the successful closure of Tax Credits and sustained progress with exceeding remaining monthly profiles, the Programme was formally closed as planned on 31 March 2025.","narrativeClaimKind":null,"outcomeStatus":"Outcome not established in annual CSV","outcomeEvidence":"The project has no record in the 2025-26 release. The annual CSV does not identify whether it delivered, closed early, was replaced or ceased to meet the portfolio criteria."},{"id":"FCO_0010_1617-Q3","year":2025,"name":"ECHO 2 PROGRAMME","department":"FCDO","category":"ICT","description":"The ECHO 2 Programme is procuring and managing the transition of new services to replace the expiring ECHO1 contract as well as managing the exit of services under ECHO1. It also encompasses setting up a process and approach for operating a Dynamic Purchasing System and service and support in BAU once sites have moved over to the next generation Wide Area Network that will be managed under a new contractual arrangement with a Network Services Integrator.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors‚ The ECHO2 Programme has a delivery confidence of GREEN, with the Programme having transitioned the capability to Live Service, completed all of its transitions and now closed. The Programme delivered to its requirement, under its allocated FBC budget and to the re-baselined timeline. No exemptions or exceptions are required and as a now closed programme it was recommended by the IPA that it be removed from GMPP governance and removed from GRIP reporting as a result.","startDate":"2015-09-01","endDate":null,"scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 23/01/2025 to 05/03/2025. This is primarily due to the following factors‚ Cutover failures due to equipment failure, low response times, no connectivity and complex sites pushed the timescales to the right","fyBaseline":37.9,"fyForecast":37.9,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":null,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 265.","benefits":null,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 119 to 121. This is primarily due to the following factors‚ benefits due to site closures","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors‚ The ECHO2 Programme has a delivery confidence of GREEN, with the Programme having transitioned the capability to Live Service, completed all of its…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 23/01/2025 to 05/03/2025. This is primarily due to the following factors‚ Cutover failures due to equipment failure, low response times, no connectivity and complex sites pushed the timescales to the right","narrativeClaimKind":null,"outcomeStatus":"Outcome not established in annual CSV","outcomeEvidence":"The project has no record in the 2025-26 release. The annual CSV does not identify whether it delivered, closed early, was replaced or ceased to meet the portfolio criteria."},{"id":"HMRC_0029_2021-Q3","year":2025,"name":"TRADER SUPPORT SERVICE","department":"HMRC","category":"Government Transformation and Service Delivery","description":"The Northern Ireland Trader Support Service (TSS) was established to provide a free-to-use service to support traders to meet their obligations under the Northern Ireland Protocol (now Windsor Framework) following the end of the European Union transition period on 31/12/20. The TSS helps traders move goods between Great Britain and Northern Ireland or bring goods into Northern Ireland from outside the United Kingdom.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors‚ The increased rating was due to the fact that TSS has continued to deliver a high-quality service, along with new functionality to deliver the Windsor Framework, and improvements to customer experience and critical business system alignment. TSS will maintain support for traders to complete declarations, including under the new simplified customs processes.","startDate":"2020-06-29","endDate":"2025-06-30","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/12/2024 to 30/06/2025. This is primarily due to the following factors‚ This is due to the fact that we secured agreement to extend TSS for one year to December 2025 in order to maintain support for traders.","fyBaseline":123.6,"fyForecast":88.19,"fyVariance":28.65,"varianceNarrative":"The budget variance exceeds 5%. The budget variance exceeds 5%. The cost of delivering TSS in 24/25 was lower than our baseline due to driving efficiencies and value for money within TSS operations.","wholeLifeCost":711.5,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 630 to 711. This is primarily due to the following factors‚ The project's departmental-agreed baseline Whole Life Cost at 24/25-Q4 increased from £630m to £711m. This is primarily due to the fact that we secured agreement to extend TSS for one year to December 2025 in order to maintain support for traders.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ The Programme is not driven by financial benefit so the monetised benefits at 23/24-Q4 remained at £0m to 24/25-Q4. The benefits are aimed at traders moving goods from Great Britain to Northern Ireland and the service helps them to meet their legal obligations under the Windsor Framework (previously the Northern Ireland Protocol).","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors‚ The increased rating was due to the fact that TSS has continued to deliver a high-quality service, along with new functionality to deliver the Windsor…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/12/2024 to 30/06/2025. This is primarily due to the following factors‚ This is due to the fact that we secured agreement to extend TSS for one year to December 2025 in order to maintain support for traders.","narrativeClaimKind":null,"outcomeStatus":"Outcome not established in annual CSV","outcomeEvidence":"The project has no record in the 2025-26 release. The annual CSV does not identify whether it delivered, closed early, was replaced or ceased to meet the portfolio criteria."},{"id":"HMRC_0159_2223-Q2","year":2025,"name":"SINGLE CUSTOMS PLATFORM","department":"HMRC","category":"ICT","description":"Single Customs Platform (SCP) has replaced the legacy 'Customs Handling of Imports Exports and Freight' (CHIEF) customs system with the new Customs Declaration Service (CDS). SCP objectives are to: 1. Transition the CDS into the United Kingdom's (UK) single customs platform 2. Decommission the legacy CHIEF system and its associated services, removing complexity and cost for His Majesty's Revenue and Customs (HMRC) and traders 3. Deliver ongoing critical CDS improvements Enhancements have been carried out over several years in consultation with the border industry. CDS has successfully processed 105 million customs declarations since 2018; and has the flexibility and capacity to grow in line with the Government's ambitious trade plans.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Single Customs Platform (SCP) is currently rated Amber, primarily due to ongoing work to ensure Customs Declaration Service (CDS) can deliver a long term sustainable CDS Service and improved customer experience. An Infrastructure Project Authority (IPA) led review (January 2025); and an Internal Audit review (March 2025) both identified work was required to develop SCP plans to transition and close the programme. SCP is addressing and progressing both review recommendations, in conjunction with an Independent Peer Review planned for June 2025. SCP will report progress.","startDate":"2022-04-04","endDate":"2027-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2025 to 31/03/2027. This is primarily due to the following factors‚ Single Customs Platform (SCP) has identified the need to reframe its programme delivery for a further 2 years, to ensure there is a sustainable Customs Declaration Service (CDS) in place, for the longer term. SCP needs to move from being a largely functional focus, that has existed to date, and create a need to invest in the CDS Service. The programme has performed an extensive prioritisation exercise to target outcome achievement. To transition CDS to Business as Usual the programme needs to increase confidence of the CDS long-term ability to meet future requirements of HMRC, and broader HM Government border operations.","fyBaseline":115.0,"fyForecast":114.9,"fyVariance":0.08,"varianceNarrative":"The budget variance is less than or equal to 5%. The budget variance is less than or equal to 5%.","wholeLifeCost":null,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 309 to 589. This is primarily due to the following factors‚ The updated Whole Life Cost (WLC) figures now include a further two years 2025/2026 and 2026/2027. This will ensure Customs Declaration Service (CDS) delivers for the longer term. This includes: 1. Addressing CDS performance risks 2. Making CDS cheaper to operate and change 3. Deliver functionality that improves customer journeys and removes burdensome workarounds for both customers and HMRC operational teams 4. Increase tax revenue through revenue loss prevention by delivering Postponed VAT Accounting (Full Validation) functionality.","benefits":null,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 56 to 248. This is primarily due to the following factors‚ Single Customs Platform (SCP) benefits as an incremental figure was £56m in quarter 4 2023/2024, increasing to £90m for quarter 4 2024/2025. Benefits increased for SCP in 2024/2025 in the following areas: • Customs Handling of Imports Exports and Freight (CHIEF) Decommissioning benefits • Customs Declaration Service (CDS) enhancements within non-cash releasing benefits for operational areas • The original yield from Postponed VAT Accounting (PVA) The SCP Benefits whole lifecycle remains at £248m.","themes":["Cost & funding","Governance & assurance","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Single Customs Platform (SCP) is currently rated Amber, primarily due to ongoing work to ensure Customs Declaration Service (CDS) can deliver a long term sustainable…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2025 to 31/03/2027. This is primarily due to the following factors‚ Single Customs Platform (SCP) has identified the need to reframe its programme delivery for a further 2 years, to ensure there is a sustainable Customs Declaration Service (CDS) in place, for the longer term. SCP needs to move from being a largely functional focus, that has existed to date, and create a need to invest in the CDS Service. The programme has performed an extensive prioritisation exercise to target outcome achievement. To transition CDS to Business as Usual the programme needs to increase confidence of the CDS long-term ability to meet future requirements of HMRC, and broader HM Government border operations.","narrativeClaimKind":null,"outcomeStatus":"Outcome not established in annual CSV","outcomeEvidence":"The project has no record in the 2025-26 release. The annual CSV does not identify whether it delivered, closed early, was replaced or ceased to meet the portfolio criteria."},{"id":"HMRC_0291_2324-Q3","year":2025,"name":"VOA Business Systems Transformation (BST) Council Tax","department":"VOA","category":"Government Transformation and Service Delivery","description":"Business Systems Transformation (BST) is the VOA’s digital transformation programme for domestic property valuations. It is redesigning the VOA’s core Council Tax business processes and replacing its outdated and end-of-life core valuation and data IT platforms. It will support greater organisational efficiency and agility, and the ability to respond more flexibly to policy change.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from RED to AMBER. This is primarily due to the following factors‚ Business Systems Transformation (BST) is the VOA’s digital transformation programme for domestic property valuations. It is redesigning the VOA’s core Council Tax business processes and replacing its outdated and end-of-life core valuation and data IT platforms. It will support greater organisational efficiency and agility, and the ability to respond more flexibly to policy change. The programme was rated AMBER in March 2025, reflecting significant progress in the 2025/26 financial year. Following successful progression through HMRC’s Change Advisory Board (CAB) the programme delivered all 14 processes into live, with nine being deployed in Release 1.0 on 23rd January 2025, and a further five on 24th March 2025 in Release 1.1. The programme successfully launched a Local Authority (LA) Portal into Private Beta on 11th March. The 12-week phased rollout to 18 local authorities continues to plan and is receiving positive feedback. The programme will continue to address defects and improve functionality prior to an expected Gate 5 review in 25-26.","startDate":"2019-11-11","endDate":"2025-06-30","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 decreased from 31/03/2026 to 30/06/2025. This is primarily due to the following factors‚ The programme delivery schedule reduced from March 2026 to June 2025, to reflect the removal of Non-Domestic Rates deliverables. A new programme has been established which is now accountable for the scope that was removed from BST.","fyBaseline":36.5,"fyForecast":39.92,"fyVariance":9.37,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The BST programme budget variance was 9.4%, which reflected the programme shifting from a single Q3 go-live to a phased delivery in Q4 24/25.","wholeLifeCost":236.34,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 236. This is primarily due to the following factors‚ WLC will be recalculated accounting for the exclusion of Non-Domestic Rating deliverables ahead of a Gate 5 review.","benefits":273.5,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) decreased from 274 to 273. This is primarily due to the following factors‚ Benefits will be recalculated accounting for the exclusion of non-domestic rating deliverables ahead of a Gate 5 review.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Technical & integration"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from RED to AMBER. This is primarily due to the following factors‚ Business Systems Transformation (BST) is the VOA’s digital transformation programme for domestic property valuations. It is redesigning the VOA’s core…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 decreased from 31/03/2026 to 30/06/2025. This is primarily due to the following factors‚ The programme delivery schedule reduced from March 2026 to June 2025, to reflect the removal of Non-Domestic Rates deliverables. A new programme has been established which is now accountable for the scope that was removed from BST.","narrativeClaimKind":null,"outcomeStatus":"Outcome not established in annual CSV","outcomeEvidence":"The project has no record in the 2025-26 release. The annual CSV does not identify whether it delivered, closed early, was replaced or ceased to meet the portfolio criteria."},{"id":"HO_0029_1314-Q4","year":2025,"name":"IMMIGRATION PLATFORM TECHNOLOGIES (IPT)","department":"HO","category":"ICT","description":"The Immigration Platform Technologies (IPT) Programme is delivering the technology and information systems to support the immigration service through delivery of three integrated modern technology services that are cheaper to operate than those they replace. IPT will achieve operational efficiencies, optimise use of data and provide a more modern and streamlined customer journey.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from RED to AMBER. This is primarily due to the following factors‚ The Programme delivered to schedule against the revised programme plan and formally closed on the 15 May 2025.","startDate":"2013-04-01","endDate":null,"scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 27/01/2023 to 15/05/2025. This is primarily due to the following factors‚ Departmental priorities such as the Illegal Migration Act, ETAs (Electronic Travel Authorisation ) and eVisas delayed testing and planned betas across a range of services and slowed down roll-out activity. The Immigration Platform Technologies programme plan was revised and programme closure was scheduled for May 2025. The programme has now completed delivery and closed on the 15 May 2025.","fyBaseline":67.69,"fyForecast":74.44,"fyVariance":9.97,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The programme plan was revised due to Departmental priorities impacting testing and planned betas. This caused an elongation of the programme timelines and required retaining resources for longer.","wholeLifeCost":807.49,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 719 to 807. This is primarily due to the following factors‚ The programme revised the programme plan due to Departmental priorities impacting testing and planned betas. This caused an elongation of the programme timelines and required retaining resources for longer than forecast in the 2022/23 Programme Business Case.","benefits":183.4,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 183. This is primarily due to the following factors‚ IPT realised benefits progressively as it delivered elements of its scope. With the decommissioning of the legacy Case Immigration Database (CID), the programme is now positioned to achieve full benefits realisation.","themes":["Cost & funding","Technical & integration","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from RED to AMBER. This is primarily due to the following factors‚ The Programme delivered to schedule against the revised programme plan and formally closed on the 15 May 2025. Compared to financial year 23/24-Q4, the…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 27/01/2023 to 15/05/2025. This is primarily due to the following factors‚ Departmental priorities such as the Illegal Migration Act, ETAs (Electronic Travel Authorisation ) and eVisas delayed testing and planned betas across a range of services and slowed down roll-out activity. The Immigration Platform Technologies programme plan was revised and programme closure was scheduled for May 2025. The programme has now completed delivery and closed on the 15 May 2025.","narrativeClaimKind":null,"outcomeStatus":"Outcome not established in annual CSV","outcomeEvidence":"The project has no record in the 2025-26 release. The annual CSV does not identify whether it delivered, closed early, was replaced or ceased to meet the portfolio criteria."},{"id":"HO_0043_2021-Q4","year":2025,"name":"FUTURE SUPPLIERS SERVICES","department":"HO","category":"Government Transformation and Service Delivery","description":"UK Visas & Immigration (UKVI) maintains a network of visa application centres in-country and overseas. These centres allow visa applicants to complete their applications by enrolling biometric information, submitting identity documents and often supplementary evidence to be digitised and sent to UKVI. Overseas the centres also facilitate interviews and allow His Majesty's Passport Office (HMPO) overseas passport applicants to complete their applications. These services were previously outsourced via the Front-End Services UK (FES UK) contract in-country and Next-Generation of Outsourced Visas (NGOV) contracts overseas. The FES UK contract expired on 31st October 2024 and the NGOV contract was extended to 31st March 2025 (from the original expiry of 30st September 2024). The Future Supplier Services (FSS) Programme was established to procure equivalent services for an initial 4-year contract (with scope for a 1+1+1 potential extension) allowing FSS to meet its single primary objective for providing service continuity, whilst enabling interim transformative change in advance of implementing a strategic model. Although the new services to be delivered are similar to the previous provision the key changes are: - The FSS contracts are structured in 5 lots, compared to the previous 3. - The Key Performance Indicators are targeted to address service concerns within previous contracts. - The Financial solution is fundamentally changed to ensure flexibility and value for money as volumes fluctuate (this also shares risk in a more balanced way and supports service continuity). - Increased flexibility to reduce scope and volumes as Home Office (HO) digitisation rolls out resulting in a decrease of customers physically attending Visa Application Centres (VACs).","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors‚ As of 31st March 2025, the majority of delivery was complete with only a few key milestones left to be achieved. Handover to Live Services (including the remaining activities for Bio-Kit Only locations as agreed) and closure activities were on track to complete by the Programme closure date as planned. As of 30th May 2025 the Future Supplier Services Programme has successfully completed delivery and handover, and the Programme formally closed as planned.","startDate":"2020-04-01","endDate":"2025-05-30","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 28/10/2024 to 30/05/2025. This is primarily due to the following factors‚ The conclusion of the Visa and Citizenship Application Service (VCAS) procurement was delayed due to a legal challenge to the procurement outcome by a bidder (which was later dropped). The Programme was expected to award contracts in July 2023, however the legal challenge put a suspension on the contract awards for three of the five contracts. FSS was able to award one contract in August 2023 and was successful in October 2023 in lifting the suspension of award in the remaining contracts. Once all five contracts had been awarded, the Programme worked closely with the new commercial partners at detailed implementation planning and revisited its delivery timelines, shifting Programme closure to March 2025. A Portfolio Change Request in July 2024 included an additional two months of Early Life Support resulting in Programme closure timelines extending to May 2025.","fyBaseline":154.54,"fyForecast":138.55,"fyVariance":10.34,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ Dual running/exit costs have been negotiated down with the Commercial Team. As the Programme is closing and there will be no more change requests, there have been some savings against the budget allocated for change. As there is an underspend, the optimism bias was not required.","wholeLifeCost":528.98,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 423 to 528. This is primarily due to the following factors‚ The majority of this increase is driven by increased customer volumes attributable to Business as Usual (BAU) budgets. The repricing of the deals accordingly has led to a slightly improved unit price given economies of scale. Per the Full Business Case (FBC), all of that spend is volume related and part of BAU budgeting once the Programme has ended. The arrangements are net positive for the department, i.e. as volumes increased, Regulated Fees are greater than the VCAS contracts will cost. A minority of the increase is in implementation Milestone Charges attributable to the Programme budget. These are the charges payable to the new Suppliers and are driven primarily by the uplift in volumes (need for bigger premises etc), and to a lesser extent by the delay due to the procurement challenge, uplift to Security Requirements and other minor changes. The remainder of the increase is a mix of Programme delivery cost and contingency also only attributable to the Programme budget. This is driven by a combination of delay and customer volume, emergent costs (Exit) and a small amount of additional scope in work approved by Programme Board to ensure the benefits set out in the FBC are maximised. The change was approved by the Departmental Investment Committee in October 2024.","benefits":null,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 0 to 172. This is primarily due to the following factors‚ The financial model design, including the banded pricing model, was defined, allowing the Programme to forecast the estimated savings per unit (out of country) compared to the NGOV contracts.","themes":["Cost & funding","Commercial & supply chain","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors‚ As of 31st March 2025, the majority of delivery was complete with only a few key milestones left to be achieved. Handover to Live Services (including the remaining activities for Bio-Kit…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 28/10/2024 to 30/05/2025. This is primarily due to the following factors‚ The conclusion of the Visa and Citizenship Application Service (VCAS) procurement was delayed due to a legal challenge to the procurement outcome by a bidder (which was later dropped). The Programme was expected to award contracts in July 2023, however the legal challenge put a suspension on the contract awards for three of the five contracts. FSS was able to award one contract in August 2023 and was successful in October 2023 in lifting the suspension of award in the remaining contracts. Once all five contracts had been awarded, the Programme worked closely with the new commercial partners at detailed implementation planning and revisited its delivery timelines, shifting Programme closure to March 2025. A Portfolio Change Request in July 2024 included an additional two months of Early Life Support resulting in Programme closure timelines extending to May 2025.","narrativeClaimKind":null,"outcomeStatus":"Outcome not established in annual CSV","outcomeEvidence":"The project has no record in the 2025-26 release. The annual CSV does not identify whether it delivered, closed early, was replaced or ceased to meet the portfolio criteria."},{"id":"HO_0044_2021-Q4","year":2025,"name":"PASSPORT TRANSFORMATION PROGRAMME","department":"HO","category":"Government Transformation and Service Delivery","description":"Passports Transformation Programme was initiated in 2016 with a case for change built on significant operational efficiencies, the potential for improved employee engagement and public protection capabilities and a vastly improved customer experience. The ultimate aim was to deliver a modernised, automated and digitisation of the passport service. The services at that time were almost entirely paper based, with failure demand leading to customer frustration and increased costs associated with high levels of customer contact. Infrastructure was built around manual and linear processes, for example, handline and scanning paper applications / evidence. There was minimal use of automation, with work tied to physical locations. Systems were integrated and interconnected resulting in a lack of user focus with no alignment and interoperability with wider Home Office IT systems. The Programme is in its final stages and has delivered a suite of replacement products, including: - The new Digital Application Processing (DAP) system, to replace the legacy Application Management System (AMS). DAP is a workflow management system which automates those decisions that do not require human intervention, and allocates tasks to available members of staff, meaning a more efficient end to end process. - The Digital Customer Services (DCS) online interface which customers use to apply for a passport. - The new Passport Data Services system of record. Cloud-hosted platform to replace the legacy database of passport records. Provides greater resilience and security, and many more opportunities for using data in future. - Replacement of legacy fraud management applications.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Continued AMBER rating reflected the complexity within the Programme left to deliver together with competing dependencies, coupled with the risks to funding in the wider Mission and Borders Portfolio for FY 24/25 (these were mitigated for FY24/25). Next Review (GATE 5 closure) is due June 2025","startDate":"2016-04-01","endDate":null,"scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 30/04/2025 to 31/07/2025. This is primarily due to the following factors‚ Delayed due to increased complexity within the development / testing work and drain down of cases from legacy systems. These have been proactively managed and the Programme has a clear pathway to closure.","fyBaseline":86.12,"fyForecast":85.65,"fyVariance":0.55,"varianceNarrative":"The budget variance is less than or equal to 5%. n/a","wholeLifeCost":1010.06,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 730 to 1010. This is primarily due to the following factors‚ As at the end of 23/24, the cumulative spend was £730m. At end of 24/25 spend was £816m. We now anticipate the Whole Life Cost of the Programme to be approximately £1bn – noting that this includes: - The cost of running all the digital services until 2032, taking into account increased cost forecasts - The remaining change funding required to complete the Programme - Optimism bias of 50% on BAU run costs; this includes VAT where applicable and inflation for 25/26 and beyond at 2% As part of Programme closure further review will take place and be reported at Q1","benefits":82.79,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) decreased from 230 to 82. This is primarily due to the following factors‚ Reporting has been updated and refreshed to account for banked benefits (2019).","themes":["Cost & funding","Governance & assurance","Technical & integration","Commercial & supply chain"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Continued AMBER rating reflected the complexity within the Programme left to deliver together with competing dependencies, coupled with the risks to funding in the…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 30/04/2025 to 31/07/2025. This is primarily due to the following factors‚ Delayed due to increased complexity within the development / testing work and drain down of cases from legacy systems. These have been proactively managed and the Programme has a clear pathway to closure.","narrativeClaimKind":null,"outcomeStatus":"Outcome not established in annual CSV","outcomeEvidence":"The project has no record in the 2025-26 release. The annual CSV does not identify whether it delivered, closed early, was replaced or ceased to meet the portfolio criteria."},{"id":"HO_0229_2223-Q4","year":2025,"name":"Fraud Reform","department":"HO","category":"Government Transformation and Service Delivery","description":"To combat the growing threat of fraud to the public and economy, the 'then' government launched a Fraud Strategy (May 2023). The vision of the strategy was to cut fraud 10% from 2019 levels: the vision was achieved. Published crime data 4 successive quarters showed fraud had exceeded the 10% target, reaching a 17% reduction in data published for year ending December 2023. The programme was closed by the Home Office in March 2025.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at GREEN. This is primarily due to the following factors‚ An external assurance review was carried out on the programme in March 2025 and reviewers assessed the programme to be GREEN for overall delivery confidence and GREEN to progress to the next stage gate (closure).","startDate":"2022-04-01","endDate":"2025-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2025. This is primarily due to the following factors‚ The programme formally closed on 31/03/2025.","fyBaseline":31.2,"fyForecast":31.8,"fyVariance":1.92,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":431.4,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 320 to 431. This is primarily due to the following factors‚ (1) Revised cost assumptions. We have collaborated closely with law enforcement partners to refine our understanding of the requirement to maintain the programme's target deliverables in future years, including increases to recruitment and employment costs over recent years. (2) Revised cost estimates now includes annual provision for the national Stop! Think Fraud communications campaign, in line with ministerial ambition.","benefits":1282.02,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 0 to 1282. This is primarily due to the following factors‚ The vision of the Fraud Strategy was to cut fraud 10% from 2019 levels, down to 3.33million frauds by the end of the last Parliament (30 May 2024): the vision was achieved. Published crime data 4 successive quarters showed fraud had exceeded the 10% target, reaching a 17% reduction in data published for year ending December 2023. The programme has realised £54.31m of monetised benefits between FY22/23 and FY24/25. The programme is forecast to generate over £2,703.3million of present social value of benefits against an overall present social value of costs of £483million over the appraisal period of 10-years.","themes":["Cost & funding","Delivery & schedule","Governance & assurance","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at GREEN. This is primarily due to the following factors‚ An external assurance review was carried out on the programme in March 2025 and reviewers assessed the programme to be GREEN for overall delivery confidence and GREEN…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2025. This is primarily due to the following factors‚ The programme formally closed on 31/03/2025.","narrativeClaimKind":null,"outcomeStatus":"Outcome not established in annual CSV","outcomeEvidence":"The project has no record in the 2025-26 release. The annual CSV does not identify whether it delivered, closed early, was replaced or ceased to meet the portfolio criteria."},{"id":"HO_0285_2324-Q2","year":2025,"name":"MANSTON TRANSFORMATION PROGRAMME","department":"HO","category":"Government Transformation and Service Delivery","description":"Manston Transformation Programme will transform the temporary infrastructure, utilities and facilities which are not sustainable in the long term and design/build new infrastructure at the Manston Site. Additionally, new Operator/Healthcare service contracts will be procured to reduce the number of contracts, streamline processes and save on costs.","ipaDca":"Amber","sroDca":null,"deliveryConfidence":"Amber","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 changed from RED to AMBER. This is primarily due to the following factors‚ Due to the change in government, during the financial year 24/25, the programme paused the original scope of work to consider alternative value for money options. A Ministerial steer and decision was received to move forward with a revised scope and extensive work has taken place to pivot the programme. Designs, requirements and the delivery timeline has been revisited and validated and as a result the programme has now been re-baselined and the current delivery confidence assessment has changed to Amber for Q1 reporting.","startDate":"2023-01-31","endDate":"2029-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 05/11/2027 to 31/03/2029. This is primarily due to the following factors‚ Due to the change in Government, this financial year, the Programme paused and revisited the scope and requirements from a value for money perspective. A Ministerial steer and decision was given to move forward with the revised scope and since then work has taken place to pivot the Programme. Design requirements and plans have been revisited and the delivery schedule has been re-baselined.","fyBaseline":12.91,"fyForecast":11.04,"fyVariance":14.48,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ Due to the change in government, during the financial year 24/25, the programme paused the original scope of work to consider alternative value for money options. A Ministerial steer and decision was received to move forward with a revised scope and extensive work has taken place to pivot the programme. Designs, requirements and the delivery timeline has been revisited and validated and as a result the programme has now been re-baselined.","wholeLifeCost":987.31,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 2713 to 987. This is primarily due to the following factors‚ Due to the change in government, during the financial year 24/25, the programme paused the original scope of work to consider alternative value for money options. A Ministerial steer and decision was received to move forward with a revised scope and extensive work has taken place to pivot the programme. Designs, requirements and the delivery timeline has been revisited and validated and as a result the programme has now been re-baselined.","benefits":62.1,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 0 to 62. This is primarily due to the following factors‚ Over the last 12 months benefits analysis has been carried out to identify, quantify and evaluate the benefits the Programme is expected to deliver.","themes":["Cost & funding","Scope & requirements","Delivery & schedule","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 changed from RED to AMBER. This is primarily due to the following factors‚ Due to the change in government, during the financial year 24/25, the programme paused the original scope of work to consider alternative value for money…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 05/11/2027 to 31/03/2029. This is primarily due to the following factors‚ Due to the change in Government, this financial year, the Programme paused and revisited the scope and requirements from a value for money perspective. A Ministerial steer and decision was given to move forward with the revised scope and since then work has taken place to pivot the Programme. Design requirements and plans have been revisited and the delivery schedule has been re-baselined.","narrativeClaimKind":null,"outcomeStatus":"Outcome not established in annual CSV","outcomeEvidence":"The project has no record in the 2025-26 release. The annual CSV does not identify whether it delivered, closed early, was replaced or ceased to meet the portfolio criteria."},{"id":"MHCLG_0007_2122-Q1","year":2025,"name":"Towns Fund","department":"MHCLG","category":"Infrastructure and Construction","description":"The Towns Fund was established as a £3.6bn funding pot that would invest in town centres and high streets in England to build stronger, and more resilient local economies. The Towns Fund has two major components: Town Deals (£2.35bn, 101 places) and the Future High Streets Fund competition (FHSF) (£830m, 72 places). Any money that was not allocated towards successful recipients of either programme has been used to support work that is closely aligned with the outcomes of the fund. Including funding allocated to the Levelling Up Fund, the ‘Build Back Better’ initiative, Freeports and DCMS-led heritage high street regeneration programmes.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Rating remains Amber with improvement in activity and spend across the programme. Analysis of data has shown some slippage and delays. In response, approval has been granted for extensions on Town Deals and Future High Street Fund (FHSF). Town Deals has been extended to March 2027. FHSF was extended to March 2025 for places with exceptional need; and a further six-month grace period for a small number of places at risk of missing the deadline. The programme team is supporting Local Authorities and acting as a critical friend through the delivery phase, in response to the reduction in Area Lead time spent on in-flight funds and the closing of the Delivery Associate Network.","startDate":"2018-12-01","endDate":null,"scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 30/03/2026 to 31/03/2027. This is primarily due to the following factors‚ The October 2024 Spending Review has granted an additional year for Town Deals, taking the end of the programme to March 2027. There is no new money for the programme but the additional year allows for payments to be scheduled in 26/27. In September, ministers agreed a further extension to the FHSF, taking the programme to 31 March 2025.","fyBaseline":556.4,"fyForecast":516.3,"fyVariance":7.21,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ The programme had an underspend in 24/25. For Town Deals we released 92% of our budget and therefore the variance level is 8%. This was due to a range of factors but mainly due to an optimism bias at local authority level.","wholeLifeCost":3106.0,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 3106. This is primarily due to the following factors‚ The whole life cost figure relates to the costs published in the business case. This will remain unchanged for GMPP reporting, although costs may fluctuate in terms of grant repayment, overprogramming or a range of other potential issues the baseline costs will remain as are.","benefits":7594.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) decreased from 9878 to 7594. This is primarily due to the following factors‚ The Town Deals and FHSF FBC economic cases set out illustrative benefits and were based on BCRs from past interventions. The re-calculation now uses project intervention type received through performance monitoring, and average BCRs submitted by local authorities, to revise the projected benefits for the entire Towns Fund programme.","themes":["Cost & funding","Delivery & schedule","Approvals & decisions","Governance & assurance"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Rating remains Amber with improvement in activity and spend across the programme. Analysis of data has shown some slippage and delays. In response, approval has been…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 30/03/2026 to 31/03/2027. This is primarily due to the following factors‚ The October 2024 Spending Review has granted an additional year for Town Deals, taking the end of the programme to March 2027. There is no new money for the programme but the additional year allows for payments to be scheduled in 26/27. In September, ministers agreed a further extension to the FHSF, taking the programme to 31 March 2025.","narrativeClaimKind":null,"outcomeStatus":"Outcome not established in annual CSV","outcomeEvidence":"The project has no record in the 2025-26 release. The annual CSV does not identify whether it delivered, closed early, was replaced or ceased to meet the portfolio criteria."},{"id":"MHCLG_0017_2122-Q2","year":2025,"name":"Levelling Up Fund","department":"MHCLG","category":"Infrastructure and Construction","description":"The Levelling Up Fund is a £4.8 billion competitive fund allocated across three rounds, open to bids from all local authorities in the UK as well as certain public sector and other bodies in Northern Ireland. This brings allocation of all £4.8 billion of LUF funding to completion. The capital-only fund will provide grant payments to successful bidders to support town centre & high street regeneration, transport and cultural & heritage bids / projects.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Round 3 of the Fund was preserved in the 2024 Autumn Statement and agreed a reprofiling of c £1bn for projects beyond March 2026. All funding allocations are complete. LUF continues to implement NISTA recommendations in regards to aligning governance, monitoring returns and evaluation approach to the consolidation and simplification of funds as part of the devolution agenda. This will ensure the continued support and development of projects aligned to the Government's agenda, to deliver the programmes long-term benefits.","startDate":"2021-03-03","endDate":"2028-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2026 to 31/03/2028. This is primarily due to the following factors‚ Autumn Statement 2024 agreed a reprofiling of c£1.bn for LUF projects beyond March 2026. Through the latest monitoring return, we allowed projects for the first time to extend spending profiles to 2027 for Round 1 projects and 2028 for Round 2 and 3 projects. These profiles (with optimism bias applied) have informed funding profiles for Spending Review phase 2.","fyBaseline":1064.0,"fyForecast":1020.0,"fyVariance":4.14,"varianceNarrative":"The budget variance is less than 5%.","wholeLifeCost":4799.75,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) remained at 4800. This is primarily due to the following factors‚ Whole Life Costs have not changed. The full £4.8 billion of the programme’s budget has been allocated.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) has remained at 0. This is primarily due to the following factors‚ Now that all beneficiaries are known, analysis is underway to identify the monetised benefits of the programme e.g. BCR.","themes":["Cost & funding","Governance & assurance","Approvals & decisions","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Round 3 of the Fund was preserved in the 2024 Autumn Statement and agreed a reprofiling of c £1bn for projects beyond March 2026. All funding allocations are…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2026 to 31/03/2028. This is primarily due to the following factors‚ Autumn Statement 2024 agreed a reprofiling of c£1.bn for LUF projects beyond March 2026. Through the latest monitoring return, we allowed projects for the first time to extend spending profiles to 2027 for Round 1 projects and 2028 for Round 2 and 3 projects. These profiles (with optimism bias applied) have informed funding profiles for Spending Review phase 2.","narrativeClaimKind":null,"outcomeStatus":"Outcome not established in annual CSV","outcomeEvidence":"The project has no record in the 2025-26 release. The annual CSV does not identify whether it delivered, closed early, was replaced or ceased to meet the portfolio criteria."},{"id":"MOD_0001_1112-Q1","year":2025,"name":"A400M","department":"MoD","category":"Military Capability","description":"To deliver into RAF Service a worldwide, protected Tactical Air Transport capability that is able to rapidly project, sustain and recover Air and Joint Forces, in order to meet UK standing commitments and support enduring and contingent operations in the most demanding timescales. A400M refers to the overarching programme, the aircraft operated by the RAF is named the Atlas.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. Although Delivery Confidence has remained at Amber, with the Development and Production Phase (DPP) final Standard Operating Capability now on contract, delivery confidence is greater. The A400M DPP Review Note will reset the delivery schedule for the remaining projects (noting all 22 aircraft have been delivered) which will enable ‘Green’ to be reported. The main risk to delivery remains workforce capacity which the Programme continues to mitigate through Project prioritisation to smooth resource demands.","startDate":"1997-07-01","endDate":"2028-12-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2025 to 31/12/2028. This is primarily due to the following factors. Confidence has increased with the signing of the Global Deal with all Partner Nations (through the Organisation for Joint Armament Co-operation) and Airbus. The 2025 Review Note will reflect the revised schedule to achieve Full Operating Capability based on the contract.","fyBaseline":348.18,"fyForecast":300.93,"fyVariance":13.57,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. In-Year re-profiling.","wholeLifeCost":4111.81,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 3764 to 4111. This is primarily due to the following factors. Confirmation of the support costs with the signing of the Global Deal.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Delivery & schedule","Cost & funding","Workforce & capability","Approvals & decisions"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. Although Delivery Confidence has remained at Amber, with the Development and Production Phase (DPP) final Standard Operating Capability now on contract, delivery confidence is greater. The A400M DPP…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2025 to 31/12/2028. This is primarily due to the following factors. Confidence has increased with the signing of the Global Deal with all Partner Nations (through the Organisation for Joint Armament Co-operation) and Airbus. The 2025 Review Note will reflect the revised schedule to achieve Full Operating Capability based on the contract.","narrativeClaimKind":null,"outcomeStatus":"Outcome not established in annual CSV","outcomeEvidence":"The project has no record in the 2025-26 release. The annual CSV does not identify whether it delivered, closed early, was replaced or ceased to meet the portfolio criteria."},{"id":"MOD_0017_1112-Q1","year":2025,"name":"CROWSNEST PROGRAMME","department":"MoD","category":"Military Capability","description":"The Crowsnest programme is a firm price contract to deliver an organic Airborne Surveillance and Control (ASaC) capability as role fit to the Merlin Mark 2 helicopter. By delivering concurrent Land, Sea and Air surveillance and control for Carrier Strike, Littoral Manoeuvre and Land, it will provide force protection, intelligence and support to strike assets. It is part of the Carrier Enabled Power Projection programme with Queen Elizabeth Class Carriers and the F-35B Lightning II.","ipaDca":"Green","sroDca":null,"deliveryConfidence":"Green","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors. The programme having achieved Full Operating Capability in March 2025, and remaining within cost, time and performance approvals.","startDate":"2013-03-26","endDate":"2025-08-06","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 06/08/2025. This is primarily due to the following factors. The inclusion of acceptance and contract closure activity. Full Operating Capability was achieved 29 March 2025. These factors have been under review to identify opportunities to bring the programme closure earlier.","fyBaseline":4.78,"fyForecast":1.08,"fyVariance":77.4,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors. The programme is £3.7m under-spent against the funds allocated for Financial Year 2024/2025 due to a Ministry of Defence directed deferral to 2025/2026. This funding is allocated for change requests and spares purchases. The remaining in year programme spend is within the revised budget allocation.","wholeLifeCost":507.71,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) increased from 504 to 507. This is primarily due to the following factors. Whole life costs have changed due to a MOD directed funding deferral from Financial Year 2024/2025 to FY 2025/2026.","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits.","themes":["Cost & funding","Workforce & capability","Commercial & supply chain","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors. The programme having achieved Full Operating Capability in March 2025, and remaining within cost, time and performance approvals. Compared to financial year 23/24-Q4, the project's end-date…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 06/08/2025. This is primarily due to the following factors. The inclusion of acceptance and contract closure activity. Full Operating Capability was achieved 29 March 2025. These factors have been under review to identify opportunities to bring the programme closure earlier.","narrativeClaimKind":null,"outcomeStatus":"Outcome not established in annual CSV","outcomeEvidence":"The project has no record in the 2025-26 release. The annual CSV does not identify whether it delivered, closed early, was replaced or ceased to meet the portfolio criteria."},{"id":"MOD_0138_2122-Q1","year":2025,"name":"SEA VENOM","department":"MoD","category":"Military Capability","description":"Future Anti-Surface Guided Weapon (FASGW) is required to enable the Wildcat maritime helicopter to deliver kinetic effect against; and defeat difficult targets in the complex littoral and maritime environments; that lie outside the capabilities of other anti-ship weapon systems.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors. The Delivery Confidence Assessment has increased to Green against the programme's re-baselined schedule and costs. The first live firing of the weapon from the Wildcat helicopter was completed successfully in October 2024 and the capability will be deployed operationally on Carrier Strike Group 2025.","startDate":"2014-03-03","endDate":"2029-12-21","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 21/12/2029. This is primarily due to the following factors. The programme end date has been maintained.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 43 - Commercial interests","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits","themes":["Delivery & schedule","Commercial & supply chain","Cost & funding","Workforce & capability"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors. The Delivery Confidence Assessment has increased to Green against the programme's re-baselined schedule and costs. The first live firing of the weapon from the Wildcat helicopter was…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 21/12/2029. This is primarily due to the following factors. The programme end date has been maintained.","narrativeClaimKind":null,"outcomeStatus":"Outcome not established in annual CSV","outcomeEvidence":"The project has no record in the 2025-26 release. The annual CSV does not identify whether it delivered, closed early, was replaced or ceased to meet the portfolio criteria."},{"id":"MOD_0142_2122-Q1","year":2025,"name":"MARTLET","department":"MoD","category":"Military Capability","description":"The Future Anti-Surface Guided Weapon is required to enable Wildcat helicopter to deliver kinetic effect against and defeat difficult targets in the complex littoral and maritime environments; that lie outside the capabilities of other anti-ship weapon systems.","ipaDca":null,"sroDca":"Green","deliveryConfidence":"Green","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at GREEN. This is primarily due to the following factors. Martlet has achieved its Initial Operating Capability. It has moved into regular use with contracted in-service support and achievement of Full Operating Capability is on target to be achieved in Summer 2025.","startDate":"2011-04-30","endDate":"2025-12-19","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 19/12/2025. This is primarily due to the following factors. Full Operating Capability is on target to be achieved in summer 2025. The programme end date has been maintained compared to 12 months ago.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 43 - Commercial interests","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits","themes":["Workforce & capability","Commercial & supply chain","Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at GREEN. This is primarily due to the following factors. Martlet has achieved its Initial Operating Capability. It has moved into regular use with contracted in-service support and achievement of Full Operating Capability is on target to be achieved in…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 19/12/2025. This is primarily due to the following factors. Full Operating Capability is on target to be achieved in summer 2025. The programme end date has been maintained compared to 12 months ago.","narrativeClaimKind":null,"outcomeStatus":"Outcome not established in annual CSV","outcomeEvidence":"The project has no record in the 2025-26 release. The annual CSV does not identify whether it delivered, closed early, was replaced or ceased to meet the portfolio criteria."},{"id":"MOD_0143_2122-Q1","year":2025,"name":"METEOR","department":"MoD","category":"Military Capability","description":"This programme aims to achieve sustainment of a world beating Beyond Visual Range Air to Air Missile (BVRAAM) capability with our Meteor Partners (FRA, GE, SP, IT and SWE) to share cost and reap the benefits from competing in the global BVRAAM export market.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. This project is AMBER because of uncertainty on the scale and shape of any future Meteor development, and the challenges of reaching consensus on the development path for Meteor across all six partner nations. Timescales for Meteor Lightning II integration remains uncertain due to dependency on the Lightning II programme's timeline. Improvements are being made with In-Service Support and missile availability.","startDate":"2002-07-15","endDate":"2048-12-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/12/2033 to 31/12/2048. This is primarily due to the following factors. This programme is due on 31/12/2033 which, based on the current schedule, is when the first upgraded Meteor missiles will be delivered to the UK and enter into service. The programme schedule, and end date, are subject to change during 2025 as Partner Nations aim to reach a consensus on the development path for Meteor.","fyBaseline":null,"fyForecast":null,"fyVariance":null,"varianceNarrative":"Section 43 - Commercial interests","wholeLifeCost":null,"costNarrative":"Section 43 - Commercial interests","benefits":0.0,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors. No monetised benefits","themes":["Delivery & schedule","Commercial & supply chain","Cost & funding","Technical & integration"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors. This project is AMBER because of uncertainty on the scale and shape of any future Meteor development, and the challenges of reaching consensus on the development path for Meteor across all six partner…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/12/2033 to 31/12/2048. This is primarily due to the following factors. This programme is due on 31/12/2033 which, based on the current schedule, is when the first upgraded Meteor missiles will be delivered to the UK and enter into service. The programme schedule, and end date, are subject to change during 2025 as Partner Nations aim to reach a consensus on the development path for Meteor.","narrativeClaimKind":null,"outcomeStatus":"Outcome not established in annual CSV","outcomeEvidence":"The project has no record in the 2025-26 release. The annual CSV does not identify whether it delivered, closed early, was replaced or ceased to meet the portfolio criteria."},{"id":"MOJ_0028_1314-Q2","year":2025,"name":"HMCTS Reform","department":"MoJ","category":"Government Transformation and Service Delivery","description":"The HMCTS Reform Programme aims to improve the accessibility and efficiency of the justice system. The programme is centred on the principle that the system should be designed around its users, the programme will make our courts much better to use, easier to run, and cheaper to operate.","ipaDca":"Green","sroDca":null,"deliveryConfidence":"Green","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors‚ The programme has completed delivery and is undertaking formal closure.","startDate":"2016-12-01","endDate":"2025-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2025. This is primarily due to the following factors‚ The programme has completed delivery and is undertaking formal closure.","fyBaseline":35.26,"fyForecast":35.58,"fyVariance":0.91,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":1228.61,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 2789 to 1228. This is primarily due to the following factors‚ Whole Life Cost have reduced following programme rescoping and total recurring costs of HMCTS’ reformed operating model (baseline value £1,498m) have been removed as these are counted as disbenefits.","benefits":2479.5,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) decreased from 2899 to 2479. This is primarily due to the following factors‚ In line with a reduction in Whole Life Cost following programme rescoping, the benefits were reprofiled. HMCTS’ reformed operating model costs (baseline value £1,498m) are included as disbenefits.","themes":["Cost & funding","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 increased from AMBER to GREEN. This is primarily due to the following factors‚ The programme has completed delivery and is undertaking formal closure. Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 31/03/2025. This is primarily due to the following factors‚ The programme has completed delivery and is undertaking formal closure.","narrativeClaimKind":null,"outcomeStatus":"Outcome not established in annual CSV","outcomeEvidence":"The project has no record in the 2025-26 release. The annual CSV does not identify whether it delivered, closed early, was replaced or ceased to meet the portfolio criteria."},{"id":"MOJ_0073_2122-Q4","year":2025,"name":"Drug Testing Services","department":"MoJ","category":"Government Transformation and Service Delivery","description":"The project objective is to successfully procure and implement a service for the drug testing of offenders in prisons and under supervision in the community. It aims to procure services that are future-proof and support delivery of the drug testing strategy. Two contracts are to be procured 1) urine and oral fluid-based laboratory analysis services, and (2) oral fluid point of care drug testing kits.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Ongoing implementation risks.","startDate":"2021-04-01","endDate":"2025-10-08","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 08/10/2025. This is primarily due to the following factors‚ The project is on track to deliver against the baseline schedule.","fyBaseline":1.1,"fyForecast":1.0,"fyVariance":9.09,"varianceNarrative":"The budget variance exceeds 5%. This is primarily due to the following factors‚ Reduced project resources than forecast.","wholeLifeCost":58.6,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 184 to 58. This is primarily due to the following factors‚ Significant reductions from reduced unit prices of drug testing kits.","benefits":null,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ This project currently reports no monetised benefits. The project's benefits focus on the successful onward operation of the Drug Testing Service.","themes":["Cost & funding","Delivery & schedule","Technical & integration"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at AMBER. This is primarily due to the following factors‚ Ongoing implementation risks. Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 08/10/2025. This is primarily due to the following…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 remained at 08/10/2025. This is primarily due to the following factors‚ The project is on track to deliver against the baseline schedule.","narrativeClaimKind":null,"outcomeStatus":"Outcome not established in annual CSV","outcomeEvidence":"The project has no record in the 2025-26 release. The annual CSV does not identify whether it delivered, closed early, was replaced or ceased to meet the portfolio criteria."},{"id":"ONS_0003_2021-Q4","year":2025,"name":"Integrated Data Programme (IDP)","department":"ONS","category":"Government Transformation and Service Delivery","description":"The Integrated Data Service Programme (IDSP) supports UKSA’s ongoing contribution to the Government’s National Data Strategy to unlock the power of data across government and the wider economy. The Integrated Data Service is a trusted research environment (TRE) with a comprehensive service wrapper that addresses longstanding cultural, technical, and legal challenges to the use of government data for the public good. The IDS identifies and addresses these key challenges, delivering innovative solutions that drive progress. It establishes a responsive, end-to-end, modern, and scalable analytical environment, which significantly enhances policy formation, evaluation, and response. As such, the IDS acts as a secure and sustainable solution for government to obtain valuable insights from its data, with analysis of this valuable, systematically linked data already supporting a host of innovative analytic projects that feed into the Government’s key missions.","ipaDca":"Red","sroDca":null,"deliveryConfidence":"Red","deliveryConfidenceSource":"Independent assurance","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at RED. This is primarily due to the following factors‚ NISTA conducted a Gateway 0 Review of the programme in March 2025. The programme was given a RED DCA due to being unable to demonstrate sufficient progress in unlocking cross-government data sharing; limited case studies of analysis undertaken on IDS; ongoing uncertainty in the relationship with NDL and the future of linked data; lack of a replacement Programme Director.","startDate":"2020-01-01","endDate":"2026-03-31","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2025 to 31/03/2026. This is primarily due to the following factors‚ The first phase of the programme up to 24/25-Q4 did not deliver the planned capability as rapidly as originally expected, with challenges including the implementation of data infrastructure that provided appropriate security combined with the flexibility to link complex datasets of variable and often insufficient quality, and with accessing and securing agreement to share data from and with other government departments. Funding into 2025/26 enabled the programme to deliver the service, which is now up and running, with an unprecedented, critical mass of high value indexed data enabling mission-aligned analysis. In FY25/26 the programme will focus on four transformation stages to further enhance and scale the service: data sharing permissions, indexing and linking data, finding and accessing linked data and utilising data within policy processes.","fyBaseline":55.3,"fyForecast":54.7,"fyVariance":1.08,"varianceNarrative":"The budget variance is less than or equal to 5%.","wholeLifeCost":284.6,"costNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Whole Life Cost at 24/25-Q4 (measured in £m) decreased from 525 to 284.6. This is primarily due to the following factors‚ This is primarily due to the recognition that some of the previously ring-fenced programme funding was supporting core ONS infrastructure required for the Integrated Data Service but equally for the everyday delivery of core statistics. The ring-fenced programme funding was therefore revised down from 2025/26 onwards as per the outcome of the 2025 Spending Review Phase 1. Previously £53m per annum had been included from 2025/26 through to 2029/30. This has been reduced to £24.6m in 2025/26 and £0m ongoing. Post 2025/26 budgets are dependent on the Business case decision and the outcome from the Spending Review Phase 2.","benefits":1374.37,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) increased from 1348 to 1374. This is primarily due to the following factors‚ Government Cash releasing benefit saw a slight increase of £20k due to recalculation of the benefit value associated with closure of the SRS which was included at that time. Government non-cash releasing benefit saw a marginal decrease in value by £3k due to a revision to forecast user growth on the IDS based on SRS trends. Wider UK Public Economic benefit saw the largest change with an increase of £26.280m due to an increase in forecast project growth on the IDS in future years based on SRS trends.","themes":["Technical & integration","Cost & funding","Approvals & decisions","Delivery & schedule"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 remained at RED. This is primarily due to the following factors‚ NISTA conducted a Gateway 0 Review of the programme in March 2025. The programme was given a RED DCA due to being unable to demonstrate sufficient progress in unlocking…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/03/2025 to 31/03/2026. This is primarily due to the following factors‚ The first phase of the programme up to 24/25-Q4 did not deliver the planned capability as rapidly as originally expected, with challenges including the implementation of data infrastructure that provided appropriate security combined with the flexibility to link complex datasets of variable and often insufficient quality, and with accessing and securing agreement to share data from and with other government departments. Funding into 2025/26 enabled the programme to deliver the service, which is now up and running, with an unprecedented, critical mass of high value indexed data enabling mission-aligned analysis. In FY25/26 the programme will focus on four transformation stages to further enhance and scale the service: data sharing permissions, indexing and linking data, finding and accessing linked data and utilising data within policy processes.","narrativeClaimKind":null,"outcomeStatus":"Outcome not established in annual CSV","outcomeEvidence":"The project has no record in the 2025-26 release. The annual CSV does not identify whether it delivered, closed early, was replaced or ceased to meet the portfolio criteria."},{"id":"ONS_0261_2324-Q1","year":2025,"name":"Future Population and Migration Statistics (FPMS) Programme","department":"ONS","category":"Government Transformation and Service Delivery","description":"The Future Population and Migration Statistics (FPMS) Programme provides the Office for National Statistics (ONS) the opportunity to continue to transform the way in which it produces statistics on the population and society. It builds on the successful transformation of the Census and Data Collection Transformation Programme (CDCTP). A focus of the programme is maximising administrative data to support the ongoing production of population and migration statistics responding to user needs and agnostic of data collection methods.","ipaDca":null,"sroDca":"Amber","deliveryConfidence":"Amber","deliveryConfidenceSource":"SRO Q4 assessment","commentary":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 decreased from RED to AMBER. This is primarily due to the following factors‚ Certainty around the programmes funding and direction following approval of the Outline Business Case (OBC) Refresh and successful delivery of core objectives over its initial period of design and build. Most notable have been key successes in the admin data research and delivery. With key publications released to help support and progress this work forward. The programme continues to engage with users to ensure appropriate statistical design, assure statistical methods and to convey admin data quality. The agreement by the UK Statistics Authority board on the recommendation resulting in a refreshing of the business case during 2025-26.","startDate":"2023-04-28","endDate":"2025-06-30","scheduleNarrative":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/10/2024 to 30/06/2025. This is primarily due to the following factors‚ The project submitted an Outline Business Case (OBC) Refresh to HM Treasury in October 2023, this provided the programme’s first three years (up to 31 March 2026) funding. Additional funding will be sought via a Full Business Case (FBC) which will aim to deliver the objectives of the programme further as the programme continues to iterate.","fyBaseline":54.12,"fyForecast":54.12,"fyVariance":0.0,"varianceNarrative":"The budget variance is less than or equal to 5%. Not applicable as per guidance","wholeLifeCost":82.61,"costNarrative":"Compared to financial year 23/24-Q4, the project’s departmentally agreed Whole Life Cost at 24-25-Q4 (measured in £m) increased from 27 to 83. This is primarily due to the following factors: The Whole Life Costs for the 2023 / 2024 Financial Year were revised in 24-25-Q1 to £28.491m, following an allowed £2m switch in budget from IDP to FPMS. The Whole Life Costs are showing as £82.611m as per our period 11 reporting for the 2024 / 2025 Financial Year, a year on year increase of £54m. These costs are in relation to the approval of the Outline Business Case (OBC) refresh that was submitted in October 2023 and approval of the Spending Review. Further forecasts will be added to the above figure in the next return as the programme continues to progress towards its next Business Case.","benefits":null,"benefitsNarrative":"Compared to financial year 23/24-Q4, the project's departmentally agreed Benefits at 24/25-Q4 (measured in £m) remained at 0. This is primarily due to the following factors‚ The programme is currently in a research and development phase. As part of this, financial benefits are being calculated through external Value for Money and Return on Investment appraisals. To reflect this, only qualitative benefits are currently being tracked. Once a full business case has been submitted, a fuller picture will emerge of potential financial benefits from the programme.","themes":["Cost & funding","Approvals & decisions","Delivery & schedule","Scope & requirements"],"evidenceExcerpt":"Compared to financial year 23/24-Q4, the Infrastructure Project Authority's Delivery Confidence Assessment rating at 24/25-Q4 decreased from RED to AMBER. This is primarily due to the following factors‚ Certainty around the programmes funding and direction following approval of the Outline Business Case (OBC) Refresh and successful delivery of core…","sourceUrl":"https://www.gov.uk/government/publications/nista-annual-report-2024-2025","sourceLabel":"NISTA Annual Report 2024-25","narrativeSaysUnchangedButMoved":false,"narrativeExcerpt":"Compared to financial year 23/24-Q4, the project's end-date at 24/25-Q4 increased from 31/10/2024 to 30/06/2025. This is primarily due to the following factors‚ The project submitted an Outline Business Case (OBC) Refresh to HM Treasury in October 2023, this provided the programme’s first three years (up to 31 March 2026) funding. Additional funding will be sought via a Full Business Case (FBC) which will aim to deliver the objectives of the programme further as the programme continues to iterate.","narrativeClaimKind":null,"outcomeStatus":"Outcome not established in annual CSV","outcomeEvidence":"The project has no record in the 2025-26 release. The annual CSV does not identify whether it delivered, closed early, was replaced or ceased to meet the portfolio criteria."}]} \ No newline at end of file diff --git a/docs/engine/claim-rules.json b/docs/engine/claim-rules.json new file mode 100644 index 0000000..6cf875c --- /dev/null +++ b/docs/engine/claim-rules.json @@ -0,0 +1,87 @@ +{ + "stablePhrases": [ + "unchanged", + "remained the same", + "remains the same", + "remained at", + "remains at", + "remained scheduled", + "remains on track", + "on track", + "on-track", + "on target", + "on schedule", + "no slippage", + "no change", + "not moved", + "still forecast", + "still expected", + "as planned", + "no material change", + "no impact", + "remained static", + "remains static", + "has not changed", + "have not changed", + "not changed", + "no movement", + "unaltered", + "remained constant", + "remains constant", + "unaffected", + "not affected", + "has not slipped", + "not slipped", + "progressing to plan", + "on course", + "in line with plan", + "no deviation", + "remained stable", + "ran to agreed schedule", + "as scheduled", + "not impact" + ], + "movePhrases": [ + "increased from", + "increased to", + "decreased from", + "changed from", + "moved from", + "moved to", + "has moved to", + "has been moved", + "has been extended", + "was extended", + "extended to", + "slipped from", + "revised from", + "revised to", + "re-baselined", + "correction of published position", + "delayed to", + "now forecast", + "lengthened by", + "shortened by", + "has changed since", + "has been delayed", + "has slipped", + "has been brought forward", + "has been pushed back", + "has been replanned", + "delays", + "delayed", + "slippage", + "earlier", + "later", + "brought forward", + "reduced", + "extended", + "delay", + "slip" + ], + "negations": [ + "not", + "never", + "no longer" + ] +} diff --git a/docs/engine/narrative-files.js b/docs/engine/narrative-files.js new file mode 100644 index 0000000..ca90ded --- /dev/null +++ b/docs/engine/narrative-files.js @@ -0,0 +1,44 @@ +/** + * Read narrative text from .txt, .md or .docx in the browser (or Node). + * .docx uses the vendored JSZip build. .mpp / .pdf are refused with a clear message. + */ +(function (root, factory) { + if (typeof module === "object" && module.exports) { + module.exports = factory(); + } else { + root.ProjectLensNarrative = factory(); + } +}(typeof self !== "undefined" ? self : this, function () { + "use strict"; + + async function readNarrativeFile(file) { + const name = (file && file.name) || "narrative"; + const lower = name.toLowerCase(); + if (/\.mpp$/i.test(lower)) { + throw new Error("Export this schedule from MS Project as XML (File > Save As > XML) and load that"); + } + if (/\.pdf$/i.test(lower)) { + throw new Error("Paste the narrative text"); + } + if (/\.(txt|md)$/i.test(lower) || !/\./.test(lower)) { + if (typeof file.text === "function") return file.text(); + if (file instanceof Uint8Array) return new TextDecoder("utf-8").decode(file); + return String(file); + } + if (/\.docx$/i.test(lower)) { + const JSZipRef = typeof JSZip !== "undefined" ? JSZip : null; + if (!JSZipRef) throw new Error("Word (.docx) narratives need JSZip loaded (docs/vendor/jszip.min.js)."); + const bytes = file.arrayBuffer ? await file.arrayBuffer() : file; + const zip = await JSZipRef.loadAsync(bytes); + const doc = zip.file("word/document.xml"); + if (!doc) throw new Error("That .docx file has no word/document.xml."); + const xml = await doc.async("string"); + // Pull visible text from w:t nodes; keep it crude and deterministic. + const texts = [...xml.matchAll(/]*>([^<]*)<\/w:t>/g)].map(m => m[1]); + return texts.join("").replace(/\s+/g, " ").trim(); + } + throw new Error("Use a .txt, .md or .docx narrative, or paste the text."); + } + + return { readNarrativeFile }; +})); diff --git a/docs/engine/projectlens-engine.js b/docs/engine/projectlens-engine.js new file mode 100644 index 0000000..61bcf9d --- /dev/null +++ b/docs/engine/projectlens-engine.js @@ -0,0 +1,1506 @@ +/** + * ProjectLens shared schedule engine. + * Works as window.ProjectLensEngine in the browser and as module.exports in Node. + * Two parse entry points exist because change-assurance and schedule-review historically + * returned different shapes; Task 1 is a move, not a behaviour change. + */ +(function (root, factory) { + if (typeof module === "object" && module.exports) { + module.exports = factory(typeof require === "function" ? require : null); + } else { + root.ProjectLensEngine = factory(null); + } +}(typeof self !== "undefined" ? self : this, function (nodeRequire) { +"use strict"; + +// Keep in sync with claim-rules.json (Node loads the JSON file; browser uses this copy). +const EMBEDDED_CLAIM_RULES = { + stablePhrases: [ + "unchanged", "remained the same", "remains the same", "remained at", "remains at", + "remained scheduled", "remains on track", "on track", "on-track", "on target", + "on schedule", "no slippage", "no change", "not moved", "still forecast", + "still expected", "as planned", "no material change", "no impact", "remained static", + "remains static", "has not changed", "have not changed", "not changed", "no movement", + "unaltered", "remained constant", "remains constant", "unaffected", "not affected", + "has not slipped", "not slipped", "progressing to plan", "on course", "in line with plan", + "no deviation", "remained stable", "ran to agreed schedule", "as scheduled", "not impact", + ], + movePhrases: [ + "increased from", "increased to", "decreased from", "changed from", "moved from", + "moved to", "has moved to", "has been moved", "has been extended", "was extended", + "extended to", "slipped from", "revised from", "revised to", "re-baselined", + "correction of published position", "delayed to", "now forecast", "lengthened by", "shortened by", + "has changed since", "has been delayed", "has slipped", "has been brought forward", "has been pushed back", + "has been replanned", "delays", "delayed", "slippage", "earlier", + "later", "brought forward", "reduced", "extended", "delay", + "slip", + ], + negations: [ + "not", "never", "no longer", + ], +}; + +function loadClaimRules() { + if (nodeRequire) { + try { + return nodeRequire("./claim-rules.json"); + } catch (error) { + // Fall through to the embedded copy when the JSON path is unavailable. + } + } + return EMBEDDED_CLAIM_RULES; +} + +function numberValue(value) { + if (value === null || value === undefined || value === "") return null; + const number = Number(String(value).replace(/,/g, "")); + return Number.isFinite(number) ? number : null; +} + +function decodeXerBytes(bytes) { + // Try strict UTF-8 first (what File.text() often does), then honour ERMHDR hints. + const arr = bytes instanceof Uint8Array ? bytes : new Uint8Array(bytes); + try { + const text = new TextDecoder("utf-8", { fatal: true }).decode(arr); + return { text, encoding: "utf-8" }; + } catch (error) { + // Not valid UTF-8 — fall through to a Windows code page. + } + const head = new TextDecoder("windows-1252").decode(arr.subarray(0, Math.min(arr.length, 240))); + if (/1256|arabic/i.test(head)) { + return { text: new TextDecoder("windows-1256").decode(arr), encoding: "windows-1256" }; + } + return { text: new TextDecoder("windows-1252").decode(arr), encoding: "windows-1252" }; +} + +function parseXerTables(text) { + const tables = {}; + let tableName = null; + let fields = []; + const lines = String(text || "").replace(/^\uFEFF/, "").replace(/\r\n?/g, "\n").split("\n"); + for (const line of lines) { + if (!line) continue; + const cells = line.split("\t"); + const marker = cells[0].trim(); + if (marker === "%T") { + tableName = (cells[1] || "").trim().toUpperCase(); + if (tableName) tables[tableName] ||= []; + fields = []; + } else if (marker === "%F" && tableName) { + fields = cells.slice(1).map(field => field.trim()); + } else if (marker === "%R" && tableName && fields.length) { + const record = {}; + fields.forEach((field, index) => { record[field] = cells[index + 1] ?? ""; }); + tables[tableName].push(record); + } + } + return tables; +} + +function listProjects(text) { + const tables = parseXerTables(text); + const projects = tables.PROJECT || []; + const tasks = tables.TASK || []; + return projects.map(project => { + const projId = project.proj_id || ""; + const activityCount = tasks.filter(row => !projId || row.proj_id === projId).length; + return { + projId, + shortName: project.proj_short_name || project.proj_name || "Unnamed project", + name: project.proj_name || project.proj_short_name || "Unnamed project", + activityCount, + }; + }); +} + +function parseDate(value) { + if (!value) return null; + const clean = String(value).trim(); + const isoMatch = clean.match(/^(\d{4})-(\d{2})-(\d{2})/); + if (isoMatch) return new Date(`${isoMatch[1]}-${isoMatch[2]}-${isoMatch[3]}T12:00:00Z`); + const timestamp = Date.parse(clean); + return Number.isNaN(timestamp) ? null : new Date(timestamp); +} + +function isoDate(value) { + const parsed = value instanceof Date ? value : parseDate(value); + return parsed ? parsed.toISOString().slice(0, 10) : null; +} + +function formatDate(value) { + const parsed = value instanceof Date ? value : parseDate(value); + if (!parsed) return "Not supplied"; + return new Intl.DateTimeFormat("en-GB", { day: "numeric", month: "short", year: "numeric", timeZone: "UTC" }).format(parsed); +} + +function dayDifference(current, previous) { + if (!current || !previous) return null; + return Math.round((current.getTime() - previous.getTime()) / 86400000); +} + +function signed(value, suffix = "") { + if (value === null || value === undefined) return "Not comparable"; + if (value === 0) return `0${suffix}`; + return `${value > 0 ? "+" : ""}${Math.round(value * 10) / 10}${suffix}`; +} + +function humanFileSize(bytes) { + if (!bytes) return "synthetic demo"; + if (bytes < 1024) return `${bytes} bytes`; + if (bytes < 1024 * 1024) return `${(bytes / 1024).toFixed(1)} KB`; + return `${(bytes / (1024 * 1024)).toFixed(1)} MB`; +} + +function nonEmptyLines(text) { + return String(text || "").split(/\r?\n/).map(line => line.trim()).filter(Boolean); +} + +function parseEvidenceText(text, kind) { + const lines = nonEmptyLines(text); + const header = (lines[0] || "").toLowerCase(); + const body = lines.slice(1); + const activityCodes = [...new Set((String(text).match(/\b[A-Z]{1,8}-\d{2,6}\b/g) || []))]; + const decisionLines = /status|decision_id|activity_code/.test(header) ? body : lines; + const decisions = kind === "decision" ? decisionLines.filter(line => /\b(approved|rejected|deferred|authorised|authorized|decision|change)\b/i.test(line)).map(line => { + const status = /\bapproved|authorised|authorized\b/i.test(line) ? "Approved" : /\brejected\b/i.test(line) ? "Rejected" : /\bdeferred\b/i.test(line) ? "Deferred" : "Recorded"; + const codes = [...new Set(line.match(/\b[A-Z]{1,8}-\d{2,6}\b/g) || [])]; + return { status, codes, text: line }; + }) : []; + const riskRows = kind === "risk" ? Math.max(0, body.length || (header ? lines.length : 0)) : 0; + return { lines, header, activityCodes, decisions, riskRows, characterCount: String(text || "").length }; +} + +function parseXerReview(text, fileName = "schedule.xer", options = {}) { + if (!text || !text.trim()) throw new Error(`${fileName} is empty.`); + const tables = parseXerTables(text); + + if (!tables.TASK?.length) throw new Error(`${fileName} does not contain a readable TASK table.`); + if (!tables.PROJECT?.length) throw new Error(`${fileName} does not contain a readable PROJECT table.`); + + const wbsById = new Map((tables.PROJWBS || []).map(row => [row.wbs_id, row])); + const projectRow = options.projectId + ? (tables.PROJECT.find(row => row.proj_id === options.projectId) || tables.PROJECT[0]) + : tables.PROJECT[0]; + const taskRows = tables.TASK.filter(row => !projectRow.proj_id || row.proj_id === projectRow.proj_id); + const tasks = taskRows.map(row => { + const duration = numberValue(row.target_drtn_hr_cnt ?? row.orig_drtn_hr_cnt); + const remaining = numberValue(row.remain_drtn_hr_cnt); + const start = parseDate(row.early_start_date || row.target_start_date || row.act_start_date); + const finish = parseDate(row.early_end_date || row.target_end_date || row.act_end_date); + const taskType = row.task_type || ""; + return { + id: row.task_id, + projectId: row.proj_id, + code: row.task_code || row.task_id, + name: row.task_name || row.task_code || row.task_id, + wbsId: row.wbs_id, + wbsName: wbsById.get(row.wbs_id)?.wbs_name || wbsById.get(row.wbs_id)?.wbs_short_name || "Unassigned WBS", + calendarId: row.clndr_id || null, + type: taskType, + status: row.status_code || "", + duration, + remaining, + float: numberValue(row.total_float_hr_cnt), + start, + finish, + actualStart: parseDate(row.act_start_date), + actualFinish: parseDate(row.act_end_date), + constraint: row.constraint_type || row.cstr_type || "", + constraintDate: parseDate(row.cstr_date || row.constraint_date), + raw: row, + isMilestone: /mile/i.test(taskType) || duration === 0, + }; + }); + const taskById = new Map(tasks.map(task => [task.id, task])); + const calendars = (tables.CALENDAR || []).map(row => ({ + id: row.clndr_id, + name: row.clndr_name || row.clndr_id || "Unnamed calendar", + type: row.clndr_type || "Unknown", + })); + const relations = (tables.TASKPRED || []).filter(row => taskById.has(row.task_id) || taskById.has(row.pred_task_id)).map(row => ({ + id: row.task_pred_id || `${row.pred_task_id}->${row.task_id}`, + taskId: row.task_id, + predecessorId: row.pred_task_id, + type: row.pred_type || "PR_FS", + lag: numberValue(row.lag_hr_cnt) || 0, + taskCode: taskById.get(row.task_id)?.code || row.task_id, + predecessorCode: taskById.get(row.pred_task_id)?.code || row.pred_task_id, + external: !taskById.has(row.task_id) || !taskById.has(row.pred_task_id), + })); + + return { + fileName, + tables, + tasks, + taskById, + relations, + calendars, + projectCount: tables.PROJECT.length, + project: { + id: projectRow.proj_id || "unknown-project", + name: projectRow.proj_short_name || projectRow.proj_name || "Unnamed P6 project", + dataDate: parseDate(projectRow.last_recalc_date || projectRow.data_date), + plannedStart: parseDate(projectRow.plan_start_date || projectRow.scd_start_date), + scheduledFinish: parseDate(projectRow.scd_end_date || projectRow.plan_end_date), + }, + tableCounts: Object.fromEntries(Object.entries(tables).map(([name, rows]) => [name, rows.length])), + evidenceObjects: { + riskRecords: ["RISK", "PROJRISK", "RISKTYPE"].reduce((sum, name) => sum + (tables[name]?.length || 0), 0), + financialPeriodRecords: ["FINPER", "FINPERIOD", "TASKFIN", "TRSRCFIN"].reduce((sum, name) => sum + (tables[name]?.length || 0), 0), + activityCodeAssignments: ["TASKACTV", "ACTVCODE", "ACTVTYPE"].reduce((sum, name) => sum + (tables[name]?.length || 0), 0), + resourceAssignments: (tables.TASKRSRC || []).length, + globalObjectRecords: ["UDFTYPE", "UDFVALUE", "RSRC", "ROLERATE", "CURRTYPE"].reduce((sum, name) => sum + (tables[name]?.length || 0), 0), + }, + }; +} + +function relationSignatures(schedule) { + const signatures = new Map(schedule.tasks.map(task => [task.code, []])); + schedule.relations.forEach(relation => { + if (!signatures.has(relation.taskCode)) signatures.set(relation.taskCode, []); + signatures.get(relation.taskCode).push(`${relation.predecessorCode}|${relation.type}|${relation.lag}`); + }); + signatures.forEach(values => values.sort()); + return signatures; +} + +function relationshipMaps(schedule) { + const predecessors = new Map(schedule.tasks.map(task => [task.id, []])); + const successors = new Map(schedule.tasks.map(task => [task.id, []])); + schedule.relations.filter(relation => !relation.external).forEach(relation => { + predecessors.get(relation.taskId)?.push(relation); + successors.get(relation.predecessorId)?.push(relation); + }); + return { predecessors, successors }; +} + +function isBusinessCritical(task) { + return /\b(contract|completion|handover|takeover|acceptance|ready|readiness|operational|benefit|commission|key date|sectional|possession)\b/i.test(`${task?.code || ""} ${task?.name || ""}`); +} + +function compareSchedules(previous, current, rules) { + const previousByCode = new Map(previous.tasks.map(task => [task.code, task])); + const currentByCode = new Map(current.tasks.map(task => [task.code, task])); + const previousRelations = relationSignatures(previous); + const currentRelations = relationSignatures(current); + const allCodes = [...new Set([...previousByCode.keys(), ...currentByCode.keys()])]; + const changes = []; + + for (const code of allCodes) { + const before = previousByCode.get(code) || null; + const after = currentByCode.get(code) || null; + const types = []; + const evidence = []; + let score = 0; + let finishDelta = null; + let floatDelta = null; + + if (!before || !after) { + const added = Boolean(after); + types.push(added ? "added" : "removed"); + evidence.push({ label: added ? "Current XER" : "Previous XER", value: `${added ? "Added" : "Removed"} activity ${code}` }); + score += 22; + if ((after || before)?.isMilestone) score += 20; + } else { + finishDelta = dayDifference(after.finish, before.finish); + const startDelta = dayDifference(after.start, before.start); + const durationDelta = after.duration !== null && before.duration !== null ? after.duration - before.duration : null; + floatDelta = after.float !== null && before.float !== null ? after.float - before.float : null; + const constraintChanged = `${before.constraint}|${isoDate(before.constraintDate)}` !== `${after.constraint}|${isoDate(after.constraintDate)}`; + const beforeLogic = (previousRelations.get(code) || []).join(";"); + const afterLogic = (currentRelations.get(code) || []).join(";"); + const logicChanged = beforeLogic !== afterLogic; + + if (finishDelta !== null && finishDelta !== 0) { + types.push("dates"); + score += Math.abs(finishDelta) >= rules.materialSlipDays ? Math.min(36, 8 + Math.abs(finishDelta)) : 3; + if (finishDelta > 0) score += 5; + evidence.push({ label: "Finish movement", value: `${formatDate(before.finish)} → ${formatDate(after.finish)} (${signed(finishDelta, "d")})` }); + } + if (startDelta !== null && startDelta !== 0) evidence.push({ label: "Start movement", value: `${formatDate(before.start)} → ${formatDate(after.start)} (${signed(startDelta, "d")})` }); + if (durationDelta !== null && Math.abs(durationDelta) >= 8) { + types.push("duration"); + score += Math.min(15, 5 + Math.abs(durationDelta) / 16); + evidence.push({ label: "Original duration", value: `${before.duration}h → ${after.duration}h (${signed(durationDelta, "h")})` }); + } + if (floatDelta !== null && floatDelta !== 0) { + types.push("float"); + if (floatDelta < 0) score += Math.min(24, 7 + Math.abs(floatDelta) / 8); + evidence.push({ label: "Total float", value: `${before.float}h → ${after.float}h (${signed(floatDelta, "h")})` }); + } + if (constraintChanged) { + types.push("constraint"); + score += 18; + evidence.push({ label: "Constraint", value: `${before.constraint || "None"} ${formatDate(before.constraintDate)} → ${after.constraint || "None"} ${formatDate(after.constraintDate)}` }); + } + if (logicChanged) { + types.push("logic"); + score += 16; + evidence.push({ label: "Predecessor logic", value: `${previousRelations.get(code)?.length || 0} → ${currentRelations.get(code)?.length || 0} relationships` }); + } + if (after.float !== null && after.float < rules.floatThresholdHours) score += 10; + if (after.isMilestone && types.length) score += 18; + } + + if (!types.length) continue; + const task = after || before; + const currentFloat = after?.float ?? before?.float ?? null; + const pathClass = currentFloat === null ? "Not supplied" : currentFloat <= 0 ? "Critical or negative float" : currentFloat <= rules.nearCriticalHours ? "Near-critical" : "Outside threshold"; + const businessCritical = isBusinessCritical(task); + if (pathClass === "Critical or negative float") score += 16; + else if (pathClass === "Near-critical") score += 8; + if (businessCritical) score += 16; + if (pathClass !== "Outside threshold") evidence.push({ label: "Path sensitivity", value: `${pathClass} · exported total float ${currentFloat === null ? "not supplied" : `${currentFloat}h`}` }); + if (businessCritical) evidence.push({ label: "Business milestone signal", value: "Name or code indicates completion, acceptance, readiness or commissioning significance" }); + changes.push({ + id: `${code}-${changes.length}`, + code, + name: task.name, + wbsName: task.wbsName, + isMilestone: task.isMilestone, + types: [...new Set(types)], + finishDelta, + floatDelta, + currentFloat, + pathClass, + businessCritical, + score: Math.min(100, Math.round(score)), + severity: score >= 50 ? "high" : score >= 27 ? "medium" : "low", + before, + after, + evidence, + summary: evidence[0]?.value || `${types.join(", ")} change`, + }); + } + return changes.sort((a, b) => b.score - a.score || a.code.localeCompare(b.code)); +} + +function assessIntegrity(schedule, rules) { + const { predecessors, successors } = relationshipMaps(schedule); + const activeTasks = schedule.tasks.filter(task => !/complete/i.test(task.status)); + const missingPredecessors = activeTasks.filter(task => !task.isMilestone && (predecessors.get(task.id)?.length || 0) === 0); + const missingSuccessors = activeTasks.filter(task => !task.isMilestone && (successors.get(task.id)?.length || 0) === 0); + const longActivities = activeTasks.filter(task => task.duration !== null && task.duration > rules.maxDurationHours); + const negativeFloat = activeTasks.filter(task => task.float !== null && task.float < rules.floatThresholdHours); + const constrained = activeTasks.filter(task => task.constraint); + const positiveLag = schedule.relations.filter(relation => relation.lag > 0); + const external = schedule.relations.filter(relation => relation.external); + const issue = (type, label, items, detail, severity = "warn") => ({ type, label, count: items.length, examples: items.slice(0, 4).map(item => item.code || item.taskCode || item.id), detail, severity }); + return [ + issue("missing-predecessor", "Activities without predecessors", missingPredecessors, "Active non-milestone activities should normally be connected to the logic network."), + issue("missing-successor", "Activities without successors", missingSuccessors, "Open-ended work can weaken the reliability of downstream dates."), + issue("long-duration", "Long activities", longActivities, `Original duration exceeds ${rules.maxDurationHours / 8} eight-hour equivalent days.`), + issue("negative-float", "Float below threshold", negativeFloat, `Total float is below ${rules.floatThresholdHours} hours.`, "high"), + issue("constraints", "Dated constraints", constrained, "Constraints require a documented basis because they can influence float and driving paths."), + issue("positive-lag", "Positive relationship lag", rules.allowPositiveLag ? [] : positiveLag, "Positive lag is disabled by the selected acceptance rules."), + issue("external-logic", "External or unresolved relationships", external, "One side of the relationship is not present in this XER submission."), + ].filter(item => item.count > 0); +} + +function assessObjectDrift(previous, current) { + const previousCalendars = new Map(previous.calendars.map(item => [item.id, item.name])); + const currentCalendars = new Map(current.calendars.map(item => [item.id, item.name])); + const calendarDefinitions = [...new Set([...previousCalendars.keys(), ...currentCalendars.keys()])].filter(id => previousCalendars.get(id) !== currentCalendars.get(id)); + const previousTasks = new Map(previous.tasks.map(task => [task.code, task])); + const calendarAssignments = current.tasks.filter(task => previousTasks.has(task.code) && previousTasks.get(task.code).calendarId !== task.calendarId); + const objectCountChanges = [ + ["Activity-code assignments", previous.evidenceObjects.activityCodeAssignments, current.evidenceObjects.activityCodeAssignments], + ["Financial-period records", previous.evidenceObjects.financialPeriodRecords, current.evidenceObjects.financialPeriodRecords], + ["Global-object records", previous.evidenceObjects.globalObjectRecords, current.evidenceObjects.globalObjectRecords], + ].filter(([, before, after]) => before !== after); + const findings = []; + if (calendarDefinitions.length) findings.push({ type: "calendar-definition", label: "Changed calendar definitions", count: calendarDefinitions.length, examples: calendarDefinitions.slice(0, 4), detail: "Calendar IDs or names differ between submissions. Working-time definitions require review in P6.", severity: "high" }); + if (calendarAssignments.length) findings.push({ type: "calendar-assignment", label: "Changed activity calendars", count: calendarAssignments.length, examples: calendarAssignments.slice(0, 4).map(task => task.code), detail: "Activity calendar assignments changed and may affect dates, float and financial-period interpretation.", severity: "high" }); + if (objectCountChanges.length) findings.push({ type: "global-object-drift", label: "Code or global-object count changes", count: objectCountChanges.length, examples: objectCountChanges.map(([label]) => label), detail: objectCountChanges.map(([label, before, after]) => `${label}: ${before} → ${after}`).join("; "), severity: "warn" }); + if (current.projectCount > 1) findings.push({ type: "multiple-projects", label: "Multiple projects in current XER", count: current.projectCount, examples: [], detail: "The XER contains multiple projects. This browser review currently uses the first PROJECT record while preserving external relationships.", severity: "high" }); + return findings; +} + +function assessCompleteness(previous, current, evidence, narrative, baseline) { + const embeddedRiskCount = current.evidenceObjects.riskRecords; + const suppliedRiskCount = evidence.risk?.riskRows || 0; + const entries = [ + { key: "activities", label: "Activities", present: current.tasks.length > 0, status: current.tasks.length.toLocaleString(), detail: "Readable current TASK records" }, + { key: "relationships", label: "Relationships", present: current.relations.length > 0, status: current.relations.length.toLocaleString(), detail: "Readable current TASKPRED records" }, + { key: "calendars", label: "Calendars", present: current.calendars.length > 0, status: current.calendars.length ? current.calendars.length.toLocaleString() : "Missing", detail: current.calendars.length ? `${new Set(current.tasks.map(task => task.calendarId).filter(Boolean)).size} calendars assigned to activities` : "Calendar assumptions cannot be checked" }, + { key: "baseline", label: "Separate baseline", present: Boolean(baseline), status: baseline ? "Supplied" : "Missing", detail: baseline ? `${baseline.tasks.length.toLocaleString()} baseline activities available` : "XER does not reliably export baselines; current dates cannot be tested against commitment" }, + { key: "risk", label: "Risk evidence", present: embeddedRiskCount + suppliedRiskCount > 0, status: embeddedRiskCount + suppliedRiskCount > 0 ? `${embeddedRiskCount + suppliedRiskCount} records` : "Missing", detail: embeddedRiskCount ? "Risk-like records found in the XER" : suppliedRiskCount ? "Separate risk register supplied" : "Schedule movement cannot be reconciled to risk ownership" }, + { key: "basis", label: "Schedule basis", present: Boolean(evidence.basis?.characterCount), status: evidence.basis?.characterCount ? "Supplied" : "Missing", detail: evidence.basis?.characterCount ? `${evidence.basis.characterCount.toLocaleString()} characters of assumptions and basis` : "Calendar, productivity and sequencing assumptions are not evidenced" }, + { key: "narrative", label: "Update narrative", present: Boolean(narrative.trim()), status: narrative.trim() ? "Supplied" : "Missing", detail: narrative.trim() ? `${narrative.trim().length.toLocaleString()} characters available for claim testing` : "Contradiction testing is limited" }, + { key: "decisions", label: "Decision log", present: Boolean(evidence.decision?.decisions.length), status: evidence.decision?.decisions.length ? `${evidence.decision.decisions.length} decisions` : "Missing", detail: evidence.decision?.decisions.length ? `${evidence.decision.activityCodes.length} referenced activity codes` : "Material changes cannot be linked to an approval record" }, + { key: "float-contingency", label: "Float and contingency basis", present: Boolean(evidence.basis?.lines.join(" ").match(/\bfloat\b/i) && evidence.basis?.lines.join(" ").match(/\bcontingency\b/i)), status: evidence.basis?.lines.join(" ").match(/\bfloat\b/i) && evidence.basis?.lines.join(" ").match(/\bcontingency\b/i) ? "Addressed" : "Unclear", detail: "The schedule basis should state float ownership and where schedule contingency is held" }, + { key: "financial-periods", label: "Financial periods", present: current.evidenceObjects.financialPeriodRecords > 0, status: current.evidenceObjects.financialPeriodRecords ? `${current.evidenceObjects.financialPeriodRecords} records` : "Not present", detail: current.evidenceObjects.financialPeriodRecords ? "Financial-period records are present but still require calendar compatibility" : "Period performance cannot be assured from this submission" }, + { key: "codes", label: "Codes and global objects", present: current.evidenceObjects.activityCodeAssignments + current.evidenceObjects.globalObjectRecords > 0, status: current.evidenceObjects.activityCodeAssignments + current.evidenceObjects.globalObjectRecords > 0 ? "Present" : "Not present", detail: `${current.evidenceObjects.activityCodeAssignments} code assignments and ${current.evidenceObjects.globalObjectRecords} global-object records` }, + ]; + const presentCount = entries.filter(item => item.present).length; + const coverageLabel = presentCount >= 9 ? "Strong evidence set" : presentCount >= 6 ? "Bounded evidence set" : "Limited evidence set"; + const missing = entries.filter(item => !item.present).map(item => item.label.toLowerCase()); + return { + entries, + presentCount, + totalCount: entries.length, + coverageLabel, + missing, + boundary: missing.length ? `Conclusions are bounded because ${missing.join(", ")} ${missing.length === 1 ? "is" : "are"} missing or not present.` : "All defined evidence classes are present. Their quality and contractual status still require human review.", + }; +} + +function assessFitness(previous, current, narrative, completeness) { + const tableCheck = (name, label, required = true) => { + const previousCount = previous.tableCounts[name] || 0; + const currentCount = current.tableCounts[name] || 0; + const good = previousCount > 0 && currentCount > 0; + return { label, status: good ? "Present" : required ? "Missing" : "Not supplied", tone: good ? "good" : required ? "warn" : "info", detail: `${previousCount.toLocaleString()} previous / ${currentCount.toLocaleString()} current records` }; + }; + const sequenceGood = previous.project.dataDate && current.project.dataDate && current.project.dataDate > previous.project.dataDate; + return [ + tableCheck("TASK", "Activity table"), + tableCheck("TASKPRED", "Relationship table"), + tableCheck("PROJWBS", "Work breakdown structure"), + tableCheck("CALENDAR", "Calendars", false), + { label: "Submission sequence", status: sequenceGood ? "Valid" : "Check dates", tone: sequenceGood ? "good" : "warn", detail: `${formatDate(previous.project.dataDate)} → ${formatDate(current.project.dataDate)}` }, + { label: "Evidence coverage", status: `${completeness.presentCount}/${completeness.totalCount}`, tone: completeness.presentCount >= 9 ? "good" : "warn", detail: completeness.coverageLabel }, + { label: "Narrative", status: narrative.trim() ? "Supplied" : "Missing", tone: narrative.trim() ? "good" : "warn", detail: narrative.trim() ? `${narrative.trim().length.toLocaleString()} characters available for claim testing` : "Contradiction testing is limited without the update narrative." }, + ]; +} + +function pathCandidates(schedule, rules) { + const { predecessors, successors } = relationshipMaps(schedule); + return schedule.tasks + .filter(task => !/complete/i.test(task.status) && task.float !== null && task.float <= rules.nearCriticalHours) + .map(task => ({ + code: task.code, + name: task.name, + float: task.float, + classification: task.float <= 0 ? "Critical or negative float" : "Near-critical", + predecessors: predecessors.get(task.id)?.length || 0, + successors: successors.get(task.id)?.length || 0, + finish: isoDate(task.finish), + isMilestone: task.isMilestone, + businessCritical: isBusinessCritical(task), + })) + .sort((a, b) => a.float - b.float || Number(b.isMilestone) - Number(a.isMilestone) || a.code.localeCompare(b.code)); +} + +function reconcileDecisions(materialChanges, decisionEvidence) { + const decisions = decisionEvidence?.decisions || []; + return materialChanges.map(change => { + const matches = decisions.filter(decision => decision.codes.includes(change.code)); + return { + changeId: change.id, + code: change.code, + name: change.name, + linked: matches.length > 0, + decisions: matches, + status: matches.length ? matches.map(item => item.status).join(" / ") : "No linked decision", + }; + }); +} + +function compareBaseline(baseline, current) { + if (!baseline) return []; + const baselineByCode = new Map(baseline.tasks.map(task => [task.code, task])); + return current.tasks + .filter(task => task.isMilestone && task.finish && baselineByCode.get(task.code)?.finish) + .map(task => { + const committed = baselineByCode.get(task.code); + return { code: task.code, name: task.name, baseline: isoDate(committed.finish), current: isoDate(task.finish), movementDays: dayDifference(task.finish, committed.finish) }; + }) + .sort((a, b) => Math.abs(b.movementDays) - Math.abs(a.movementDays)); +} + +function selectPriorityChanges(materialChanges, limit) { + const selected = []; + const perWbs = new Map(); + const wbsNames = new Set(materialChanges.map(change => change.wbsName)); + // Flat WBS schedules used to shrink the executive queue to 2 items; skip that cap then. + const applyWbsCap = wbsNames.size > 1; + const mustSee = materialChanges.filter(change => change.isMilestone || change.businessCritical); + for (const change of [...mustSee, ...materialChanges]) { + if (selected.some(item => item.id === change.id)) continue; + const count = perWbs.get(change.wbsName) || 0; + if (applyWbsCap && count >= 2 && !change.isMilestone && !change.businessCritical) continue; + selected.push(change); + perWbs.set(change.wbsName, count + 1); + if (selected.length >= limit) break; + } + return selected; +} + +function projectFinishMovement(previous, current) { + let before = previous.project.scheduledFinish; + let after = current.project.scheduledFinish; + let label = "Project scheduled finish"; + if (!before || !after) { + const currentMilestones = current.tasks.filter(task => task.isMilestone && task.finish).sort((a, b) => b.finish - a.finish); + const milestone = currentMilestones.find(item => previous.tasks.some(task => task.code === item.code && task.finish)); + if (milestone) { + const previousMilestone = previous.tasks.find(task => task.code === milestone.code); + before = previousMilestone.finish; + after = milestone.finish; + label = milestone.name; + } + } + return { days: dayDifference(after, before), before, after, label }; +} + +function narrativeAssessment(narrative, changes, finishMovement) { + const text = narrative.toLowerCase(); + const conflicts = []; + const relationshipChanges = changes.filter(change => change.types.includes("logic")); + const constraintChanges = changes.filter(change => change.types.includes("constraint")); + const floatErosion = changes.filter(change => change.evidence.some(item => item.label === "Total float" && /\(-/.test(item.value))); + const claims = detectScheduleClaims(narrative, { + currentFinish: finishMovement.after, + previousFinish: finishMovement.before, + }); + const statedStable = claims.stable.length > 0 && !claims.movesStated.some(move => move.to === toIsoDay(finishMovement.after)); + const finishSlip = finishMovement.days || 0; + + if (!narrative.trim()) { + conflicts.push({ type: "Evidence gap", title: "No schedule narrative was supplied", detail: "The XER can show what changed, but not the planner's stated reason or approval basis." }); + return conflicts; + } + if (claims.contradiction && Math.abs(finishSlip) > 0) { + conflicts.push({ + type: "Direct contradiction", + title: `The narrative presents stability while the scheduled finish moved ${finishSlip} days`, + detail: `${finishMovement.label}: ${formatDate(finishMovement.before)} → ${formatDate(finishMovement.after)}. ${claims.contradiction.detail}`, + }); + } + if (statedStable && floatErosion.some(change => change.score >= 30)) conflicts.push({ type: "Hidden pressure", title: "The narrative presents stability while material float was consumed", detail: `${floatErosion.length} changed activities show float erosion that may reduce schedule resilience.` }); + if (relationshipChanges.length && !/\b(logic|relationship|predecessor|successor|resequence|sequence)\b/.test(text)) conflicts.push({ type: "Unexplained change", title: `${relationshipChanges.length} logic changes are not addressed in the narrative`, detail: "Changed predecessor logic can alter the driving path even when headline dates appear stable." }); + if (constraintChanges.length && !/\bconstraint|mandatory|must finish|must start|fixed date\b/.test(text)) conflicts.push({ type: "Unexplained change", title: `${constraintChanges.length} constraint changes are not addressed in the narrative`, detail: "A dated constraint can influence float and the apparent critical path." }); + if (finishSlip >= 7 && !claims.contradiction && !claims.movesStated.length && !/\b(delay|slip|later|movement|forecast|completion|finish)\b/.test(text)) { + conflicts.push({ type: "Narrative omission", title: "Material finish movement is not described", detail: `${finishMovement.label} moved ${finishSlip} days later between submissions.` }); + } + return conflicts; +} + +function buildQuestions(changes, conflicts, integrity, completeness, decisionReconciliation, riskEvidence) { + const questions = []; + changes.filter(change => change.severity === "high").slice(0, 4).forEach(change => { + questions.push({ type: "Material change", question: `What approved change or delivery event explains the movement in ${change.code} ${change.name}?`, evidence: change.summary, changeId: change.id }); + }); + conflicts.slice(0, 3).forEach(conflict => questions.push({ type: conflict.type, question: `How should the submission narrative be corrected or evidenced to address: ${conflict.title.toLowerCase()}?`, evidence: conflict.detail })); + completeness.entries.filter(item => !item.present).slice(0, 3).forEach(item => questions.push({ type: "Evidence gap", question: `What evidence or limitation statement is required because ${item.label.toLowerCase()} is not present?`, evidence: item.detail })); + decisionReconciliation.filter(item => !item.linked).slice(0, 3).forEach(item => questions.push({ type: "Approval trace", question: `Which approved decision authorises the material change to ${item.code} ${item.name}?`, evidence: "No matching activity code was found in the supplied decision log.", changeId: item.changeId })); + if (riskEvidence) changes.filter(change => change.severity === "high" && !riskEvidence.activityCodes.includes(change.code)).slice(0, 2).forEach(change => questions.push({ type: "Risk trace", question: `Which owned risk explains the high-priority movement in ${change.code} ${change.name}?`, evidence: "No matching activity code was found in the supplied risk evidence.", changeId: change.id })); + integrity.filter(item => item.severity === "high" || item.count >= 3).slice(0, 3).forEach(item => questions.push({ type: "Schedule integrity", question: `What is the acceptance or remediation decision for ${item.count} ${item.label.toLowerCase()}?`, evidence: `${item.detail} Examples: ${item.examples.join(", ") || "none"}.` })); + return questions.slice(0, 10); +} + +function buildReview(previous, current, narrative, rules, evidence = {}, baseline = null) { + const changes = compareSchedules(previous, current, rules); + const integrity = [...assessIntegrity(current, rules), ...assessObjectDrift(previous, current)]; + const completeness = assessCompleteness(previous, current, evidence, narrative, baseline); + const fitness = assessFitness(previous, current, narrative, completeness); + const finishMovement = projectFinishMovement(previous, current); + const conflicts = narrativeAssessment(narrative, changes, finishMovement); + const materialChanges = changes.filter(change => change.score >= 27 || change.isMilestone || change.businessCritical || change.types.includes("constraint") || Math.abs(change.finishDelta || 0) >= rules.materialSlipDays); + materialChanges.forEach(change => { change.riskLinked = Boolean(evidence.risk?.activityCodes.includes(change.code)); }); + const priorityChanges = selectPriorityChanges(materialChanges, rules.executiveChangeLimit); + const paths = pathCandidates(current, rules); + const decisionReconciliation = reconcileDecisions(materialChanges, evidence.decision); + const baselineMovements = compareBaseline(baseline, current); + const questions = buildQuestions(priorityChanges, conflicts, integrity, completeness, decisionReconciliation, evidence.risk); + return { + generatedAt: new Date().toISOString(), + previous, + current, + narrative, + rules, + evidence, + baseline, + changes, + materialChanges, + priorityChanges, + integrity, + fitness, + completeness, + paths, + decisionReconciliation, + baselineMovements, + finishMovement, + conflicts, + questions, + }; +} + + +function parseXerAssurance(text, fileName, options = {}) { + if (!text?.trim()) throw new Error(`${fileName} is empty.`); + const tables = parseXerTables(text); + + if (!tables.PROJECT?.length || !tables.TASK?.length) throw new Error(`${fileName} is not a readable Primavera P6 schedule file (XER).`); + if (tables.PROJECT.length !== 1 && !options.projectId) { + throw new Error(`${fileName} contains multiple projects. Export a single project for change assurance, or use the detailed schedule review to inspect first-project scope.`); + } + + const project = options.projectId + ? (tables.PROJECT.find(row => row.proj_id === options.projectId) || null) + : tables.PROJECT[0]; + if (!project) throw new Error(`${fileName} has no project matching the selected project ID.`); + if (!project.proj_id?.trim()) throw new Error(`${fileName} has no project ID. Export a single-project schedule file (XER) and retry.`); + const taskRows = tables.TASK.filter(row => !project.proj_id || row.proj_id === project.proj_id); + const tasks = taskRows.map(row => ({ + code: row.task_code || row.task_id, + name: row.task_name || row.task_code || row.task_id, + finish: parseDate(row.early_end_date || row.target_end_date || row.act_end_date), + float: numberValue(row.total_float_hr_cnt), + constraint: row.constraint_type || row.cstr_type || "", + constraintDate: parseDate(row.cstr_date || row.constraint_date), + status: row.status_code || "", + type: row.task_type || "", + })); + if (tasks.some(task => !task.code) || new Set(tasks.map(task => task.code)).size !== tasks.length) throw new Error(`${fileName} needs unique, non-empty activity codes for comparison.`); + if (!parseDate(project.scd_end_date || project.plan_end_date)) throw new Error(`${fileName} has no supported project scheduled finish. Export a calculated single-project schedule and retry.`); + const codeById = new Map(taskRows.map(row => [row.task_id, row.task_code || row.task_id])); + const relations = (tables.TASKPRED || []).map(row => JSON.stringify([codeById.get(row.pred_task_id) || row.pred_task_id, codeById.get(row.task_id) || row.task_id, row.pred_type || "Not supplied", numberValue(row.lag_hr_cnt)])); + + return { + fileName, + sourceText: text.replace(/\r\n?/g, "\n").trim(), + project: { + id: project.proj_id || "unassigned", + name: project.proj_short_name || project.proj_name || "Unnamed project", + dataDate: parseDate(project.last_recalc_date || project.data_date), + scheduledFinish: parseDate(project.scd_end_date || project.plan_end_date), + }, + tasks, + taskByCode: new Map(tasks.map(task => [task.code, task])), + relations: new Set(relations), + }; +} + +function taskChanges(previous, current) { + const codes = new Set([...previous.taskByCode.keys(), ...current.taskByCode.keys()]); + const changes = []; + const activityEvidence = []; + const snapshot = task => task ? { finish: formatDate(task.finish), totalFloatHours: task.float, constraintType: task.constraint || "None", constraintDate: formatDate(task.constraintDate) } : null; + let constraintChanges = 0; + let floatErosion = 0; + + codes.forEach(code => { + const before = previous.taskByCode.get(code); + const after = current.taskByCode.get(code); + if (!before || !after) { + activityEvidence.push({ code, name: (after || before).name, before: snapshot(before), after: snapshot(after) }); + changes.push({ code, name: (after || before).name, summary: after ? "Activity added" : "Activity removed" }); + return; + } + const finishDelta = dayDifference(after.finish, before.finish); + const constraintChanged = `${before.constraint}|${formatDate(before.constraintDate)}` !== `${after.constraint}|${formatDate(after.constraintDate)}`; + const floatDelta = before.float !== null && after.float !== null ? after.float - before.float : null; + if (finishDelta || constraintChanged || (floatDelta !== null && floatDelta !== 0)) activityEvidence.push({ code, name: after.name, before: snapshot(before), after: snapshot(after) }); + if (constraintChanged) constraintChanges += 1; + if (floatDelta !== null && floatDelta < 0) floatErosion += 1; + if ((finishDelta && Math.abs(finishDelta) >= 7) || constraintChanged || (floatDelta !== null && floatDelta <= -8)) { + const evidence = []; + if (finishDelta) evidence.push(`finish ${finishDelta > 0 ? "+" : ""}${finishDelta}d`); + if (constraintChanged) evidence.push("constraint changed"); + if (floatDelta !== null && floatDelta < 0) evidence.push(`float ${floatDelta}h`); + changes.push({ code, name: after.name, summary: evidence.join(" · ") }); + } + }); + + const relationEvidence = [...new Set([...previous.relations, ...current.relations])].filter(signature => previous.relations.has(signature) !== current.relations.has(signature)).map(signature => { + const [predecessor, successor, type, lagHours] = JSON.parse(signature); + return { change: current.relations.has(signature) ? "Added" : "Removed", predecessor, successor, type, lagHours }; + }); + const relationChanges = relationEvidence.length; + return { changes, activityEvidence, relationEvidence, constraintChanges, floatErosion, relationChanges }; +} + +function escapeRegExp(value) { + return String(value).replace(/[.*+?^${}()|[\]\\]/g, "\\$&"); +} + +function toIsoDay(value) { + if (!value) return null; + if (value instanceof Date) return isoDate(value); + const clean = String(value).trim(); + if (/^\d{4}-\d{2}-\d{2}/.test(clean)) return clean.slice(0, 10); + const parsed = parseDate(clean); + return parsed ? isoDate(parsed) : null; +} + +function dayDeltaIso(a, b) { + const left = toIsoDay(a); + const right = toIsoDay(b); + if (!left || !right) return null; + return dayDifference(parseDate(left), parseDate(right)); +} + +function expandTwoDigitYear(year) { + const n = Number(year); + if (!Number.isFinite(n)) return null; + return n < 100 ? 2000 + n : n; +} + +function lastDayOfMonth(year, month) { + // month is 1-12; Date.UTC day 0 of next month is the last day of this one + return new Date(Date.UTC(year, month, 0, 12, 0, 0)); +} + +function financialYearQuarterRange(startYearTwoDigitOrFour, quarter) { + // Q1 Apr–Jun, Q2 Jul–Sep, Q3 Oct–Dec, Q4 Jan–Mar of the next calendar year. + const start = expandTwoDigitYear(startYearTwoDigitOrFour); + if (!start || quarter < 1 || quarter > 4) return null; + if (quarter === 1) { + return { + start: new Date(Date.UTC(start, 3, 1, 12)), + end: new Date(Date.UTC(start, 5, 30, 12)), + }; + } + if (quarter === 2) { + return { + start: new Date(Date.UTC(start, 6, 1, 12)), + end: new Date(Date.UTC(start, 8, 30, 12)), + }; + } + if (quarter === 3) { + return { + start: new Date(Date.UTC(start, 9, 1, 12)), + end: new Date(Date.UTC(start, 11, 31, 12)), + }; + } + return { + start: new Date(Date.UTC(start + 1, 0, 1, 12)), + end: new Date(Date.UTC(start + 1, 2, 31, 12)), + }; +} + +function quarterContainsFinish(entry, currentFinish, graceDays = 14) { + // True when currentFinish sits inside the quarter, with a small edge grace. + const current = toIsoDay(currentFinish); + if (!current || !entry.quarterStart || !entry.quarterEnd) return false; + const day = parseDate(current); + const start = parseDate(entry.quarterStart); + const end = parseDate(entry.quarterEnd); + if (!day || !start || !end) return false; + const early = new Date(start.getTime() - graceDays * 86400000); + const late = new Date(end.getTime() + graceDays * 86400000); + return day.getTime() >= early.getTime() && day.getTime() <= late.getTime(); +} + +const MONTH_INDEX = { + jan: 1, january: 1, feb: 2, february: 2, mar: 3, march: 3, apr: 4, april: 4, + may: 5, jun: 6, june: 6, jul: 7, july: 7, aug: 8, august: 8, sep: 9, sept: 9, september: 9, + oct: 10, october: 10, nov: 11, november: 11, dec: 12, december: 12, +}; + +function normaliseNarrativeText(text) { + // Paste from Word / PDFs often leaves NBSP and double spaces inside dates. + return String(text || "").replace(/\u00A0/g, " ").replace(/\s+/g, " "); +} + +function fyContextBefore(text, index) { + // Short left window: enough for "compared to financial year" plus a bit of filler. + return text.slice(Math.max(0, index - 48), index); +} + +function isReportingPeriodContext(before) { + // "Compared to financial year 21/22-Q4" and "end-date at 22/23-Q4" are report labels. + return /(?:\bcompared\s+to|\bsince|\bat|\bin|\bas\s+of)(?:\s+financial\s+year)?\s*$/i.test(before); +} + +function isEndDateFinishContext(before) { + // Narrative is naming when the project ends, not when the report was filed. + return /\b(?:end[\s-]?date|completion|forecast\s+to\s+complete|finish|close)\b/i.test(before); +} + +function leftWindow(text, index, size = 90) { + return text.slice(Math.max(0, index - size), index); +} + +function rightWindow(text, index, raw, size = 40) { + const start = index + String(raw || "").length; + return text.slice(start, Math.min(text.length, start + size)); +} + +function classifyDateRole(text, item) { + // Bind each date to what the sentence is talking about, not just that a date exists. + const before = leftWindow(text, item.index).split(/[.;!?]/).pop(); + const after = rightWindow(text, item.index, item.raw); + const beforeLower = before.toLowerCase(); + const afterLower = after.toLowerCase(); + + // Previous finish first: "since last year's … date of X". + if ( + /last\s+year'?s?.{0,48}date\s+of\s*$/i.test(before) + || /(?:previously|originally)(?:\s+(?:scheduled|expected|forecast|due)\s+to\s+(?:complete|finish|end)\s+(?:in|by|on))?\s*$/i.test(before) + || /\b(?:was|from)\s*$/i.test(before) + ) { + return "previous-finish"; + } + + // Milestone-style labels: "Phase 2 go-live Mar 2023". + if (/\b(?:go-?live|milestone|phase\s+\d+|gate\s+\d+|contract)\b/i.test(beforeLower) + || /\b(?:go-?live|milestone)\b/i.test(afterLower)) { + return "other"; + } + + // Current finish: end/completion clause, or "remained the same at ". + if (/\b(?:closed\s+(?:as\s+(?:per\s+)?plan(?:ned)?\s+)?(?:in|on)|closure\s+took\s+place\s+in)\s*$/i.test(before)) return "actual-finish"; + const endSubject = /\b(?:end[\s-]?date|project\s+end|baseline\s+project\s+end|complet(?:ion(?:\s+date)?|e)|closure|finish(?:\s+date)?|programme\s+end|scheduled\s+to\s+finish|forecast\s+end|current\s+forecast\s+end)\b/i.test(before); + if (/\b(?:completion|finish|closure|end[ -]?date)(?:\s+date)?\s*(?:(?:in|by|on|for)\s+|:)\s*$/i.test(before)) return "current-finish"; + if (/\b(?:completion|finish|closure|end[ -]?date)(?:\s+date)?\s*$/i.test(before)) return "current-finish"; + if (/\b(?:complete(?:d)?|finish(?:ed)?|delivered|end)\s+(?:in|by|on)\s*$/i.test(before) + && /\b(?:programme|project|will|expected|scheduled|forecast|due)\b/i.test(before)) return "current-finish"; + if (/\b(?:and\s+complete\s+(?:in|by|on)|close(?:\s+down)?\s+until|end\s+date\s+to|end\s+date\s+estimated\s+as)\s*$/i.test(before)) return "current-finish"; + const stableAtDate = /(?:remained\s+the\s+same|remains\s+the\s+same|remained\s+static|remains\s+static|remained\s+constant|remains\s+constant|remained\s+at|remains\s+at|unchanged)\s+at\s*$/i.test(before); + const currentCue = /(?:\bis(?:\s+now)?\b|\bof\b|\bnow\b|\bto\s+complete\s+by\b|\bextended\s+to\b|\brevised\s+to\b|\bscheduled\s+to\s+finish\s+on\b|\bremained\s+at\b|\bremains\s+at\b)\s*$/i.test(before); + if (/\b(?:expected|scheduled|forecast|due|will)\s+(?:to\s+)?complete\s+(?:in|by|on)\s*$/i.test(before)) return "current-finish"; + if (endSubject && /(?:\b(?:will\s+be|set\s+for|expected\s+(?:in|by|on)|scheduled\s+for|due\s+(?:in|by|on)|forecast\s+for)|:)\s*$/i.test(before)) return "current-finish"; + if (stableAtDate || (endSubject && (currentCue || /\b(?:is|remained|remains|now)\b/i.test(before.slice(-40))))) { + return "current-finish"; + } + if (/\b(?:finish|completion|end[\s-]?date)\s+(?:is|of|at|remained|remains)\s*$/i.test(before)) { + return "current-finish"; + } + if (item.precision === "quarter" && endSubject) { + return "current-finish"; + } + + // Reporting: period labels, review/report words — not bare "at ". + const reportingBefore = + /(?:\bcompared\s+to|\bas\s+at|\bas\s+of)(?:\s+financial\s+year)?\s*$/i.test(before) + || /\b(?:at|in)\s+(?:financial\s+year\s+)?$/i.test(before) && /^(?:q[1-4]\b|\d{2}\/\d{2})/i.test(item.raw) + || /\b(?:review|report|reporting\s+period)\s*$/i.test(before); + const reportingAfter = /^\s*(?:review|report)\b/i.test(after); + // Parenthetical date sitting straight after "at Q2 2021" / compared-to cue. + const parenAfterReporting = + /\(\s*$/.test(before) + && /(?:\bcompared\s+to|\bas\s+at|\bas\s+of|\bat|\bin)\b.{0,48}$/i.test(before.slice(0, -1)); + if (reportingBefore || reportingAfter || parenAfterReporting) { + return "reporting"; + } + + return "other"; +} + +function pushFyQuarter(dates, text, raw, index, startYear, quarter) { + const range = financialYearQuarterRange(startYear, quarter); + if (!range) return; + const before = fyContextBefore(text, index); + if (isReportingPeriodContext(before)) { + // Keep the label so role classification can mark it reporting, but skip + // day-delta mismatch via the reporting role rather than dropping it entirely. + dates.push({ + iso: isoDate(range.end), + raw, + index, + fyQuarter: true, + roleHint: "reporting", + }); + return; + } + if (isEndDateFinishContext(before)) { + dates.push({ + iso: isoDate(range.end), + raw, + index, + precision: "quarter", + quarterStart: isoDate(range.start), + quarterEnd: isoDate(range.end), + roleHint: "current-finish", + }); + return; + } + // No clear role: keep the old fyQuarter marker so day-delta mismatch still skips it. + dates.push({ iso: isoDate(range.end), raw, index, fyQuarter: true, roleHint: "other" }); +} + +function extractNarrativeDates(text) { + const dates = []; + const push = (raw, date, index) => { + if (!date || Number.isNaN(date.getTime())) return; + dates.push({ iso: isoDate(date), raw, index }); + }; + + // ISO first so later patterns do not re-hit the same span awkwardly. + for (const match of text.matchAll(/\b(\d{4}-\d{2}-\d{2})\b/g)) { + push(match[1], parseDate(match[1]), match.index); + } + + // 31/12/2027 or 31/12/27 + for (const match of text.matchAll(/\b(\d{1,2})\/(\d{1,2})\/(\d{2,4})\b/g)) { + const day = Number(match[1]); + const month = Number(match[2]); + const year = expandTwoDigitYear(match[3]); + push(match[0], new Date(Date.UTC(year, month - 1, day, 12)), match.index); + } + + // 31 December 2027 / 30th September 2020 / 31 Dec 27 / 30 June 26 + for (const match of text.matchAll(/\b(\d{1,2})(?:st|nd|rd|th)?\s+(Jan(?:uary)?|Feb(?:ruary)?|Mar(?:ch)?|Apr(?:il)?|May|Jun(?:e)?|Jul(?:y)?|Aug(?:ust)?|Sep(?:t(?:ember)?)?|Oct(?:ober)?|Nov(?:ember)?|Dec(?:ember)?)\s+(\d{2,4})\b/gi)) { + // "Phase 2 Mar 2023" looks like a day-month date; skip when a phase/gate label owns the digit. + const ahead = text.slice(Math.max(0, match.index - 12), match.index); + if (/\b(?:phase|gate|stage|step)\s*$/i.test(ahead)) continue; + const day = Number(match[1]); + const month = MONTH_INDEX[match[2].toLowerCase()]; + const year = expandTwoDigitYear(match[3]); + push(match[0], new Date(Date.UTC(year, month - 1, day, 12)), match.index); + } + + // December 2027 (month + year only → last day of that month) + for (const match of text.matchAll(/\b(Jan(?:uary)?|Feb(?:ruary)?|Mar(?:ch)?|Apr(?:il)?|May|Jun(?:e)?|Jul(?:y)?|Aug(?:ust)?|Sep(?:t(?:ember)?)?|Oct(?:ober)?|Nov(?:ember)?|Dec(?:ember)?)\s+(\d{4})\b/gi)) { + // Skip month+year spans already covered by a day-month match that embeds them. + const covered = dates.some(d => + d.index <= match.index + && d.index + d.raw.length >= match.index + match[0].length + ); + if (covered) continue; + const month = MONTH_INDEX[match[1].toLowerCase()]; + const year = Number(match[2]); + push(match[0], lastDayOfMonth(year, month), match.index); + } + + // Q4 2027-28 and Q2 25/26 (financial-year quarters). + for (const match of text.matchAll(/\bQ([1-4])\s+(\d{4})[-/](\d{2})\b/gi)) { + pushFyQuarter(dates, text, match[0], match.index, Number(match[2]), Number(match[1])); + } + for (const match of text.matchAll(/\bQ([1-4])\s+(\d{2})\/(\d{2})\b/gi)) { + pushFyQuarter(dates, text, match[0], match.index, expandTwoDigitYear(match[2]), Number(match[1])); + } + + // 25/26-Q4 + for (const match of text.matchAll(/\b(\d{2})\/(\d{2})-Q([1-4])\b/gi)) { + pushFyQuarter(dates, text, match[0], match.index, expandTwoDigitYear(match[1]), Number(match[3])); + } + + // 23-Jan-2031 (P6 / GMPP style) + for (const match of text.matchAll(/\b(\d{1,2})-(Jan(?:uary)?|Feb(?:ruary)?|Mar(?:ch)?|Apr(?:il)?|May|Jun(?:e)?|Jul(?:y)?|Aug(?:ust)?|Sep(?:t(?:ember)?)?|Oct(?:ober)?|Nov(?:ember)?|Dec(?:ember)?)-(\d{4})\b/gi)) { + const day = Number(match[1]); + const month = MONTH_INDEX[match[2].toLowerCase()]; + const year = expandTwoDigitYear(match[3]); + push(match[0], new Date(Date.UTC(year, month - 1, day, 12)), match.index); + } + + // Calendar quarters and year-only finishes retain their full range. + for (const match of text.matchAll(/\b(20\d{2})(?:-Q([1-4]))?\b/gi)) { + if (dates.some(d => d.index <= match.index && d.index + d.raw.length >= match.index + match[0].length)) continue; + const year = Number(match[1]); + const quarter = Number(match[2]); + dates.push({ iso: isoDate(lastDayOfMonth(year, quarter ? quarter * 3 : 12)), raw: match[0], index: match.index, + precision: quarter ? "quarter" : "year", quarterStart: `${year}-${quarter ? String(quarter * 3 - 2).padStart(2, "0") : "01"}-01`, + quarterEnd: isoDate(lastDayOfMonth(year, quarter ? quarter * 3 : 12)) }); + } + // De-duplicate identical iso+index hits from overlapping patterns, then bind roles. + const seen = new Set(); + const unique = dates.filter(item => { + const key = `${item.iso}@${item.index}@${item.raw}`; + if (seen.has(key)) return false; + seen.add(key); + return true; + }); + return unique.map(item => { + const role = item.roleHint || classifyDateRole(text, item); + const { roleHint, ...rest } = item; + return { ...rest, role }; + }); +} + +function findPhraseHits(text, phrases) { + const hits = []; + const lower = text.toLowerCase(); + for (const phrase of phrases) { + const pattern = new RegExp(`\\b${escapeRegExp(phrase.toLowerCase()).replace(/\s+/g, "\\s+")}\\b`, "gi"); + for (const match of lower.matchAll(pattern)) { + hits.push({ phrase, index: match.index }); + } + } + return hits.sort((a, b) => a.index - b.index); +} + +function clauseAround(text, index) { + // One sentence either side of the hit is enough to see what the phrase is about. + const leftBreak = Math.max( + text.lastIndexOf(".", index - 1), + text.lastIndexOf(";", index - 1), + text.lastIndexOf("!", index - 1), + text.lastIndexOf("?", index - 1), + ); + const start = leftBreak === -1 ? Math.max(0, index - 140) : leftBreak + 1; + let end = text.length; + for (const mark of [".", ";", "!", "?"]) { + const at = text.indexOf(mark, index); + if (at !== -1) end = Math.min(end, at + 1); + } + end = Math.min(end, index + 140); + return text.slice(start, end); +} + +function phraseAboutEndDate(text, index) { + // Moves of a contract start / tender / milestone do not count as end-date claims. + const clause = clauseAround(text, index); + const aboutEnd = /\b(?:end[\s-]?date|completion|finish|programme\s+end|project\s+end|scheduled\s+baseline|baseline\s+project\s+end|overall\s+programme)\b/i.test(clause); + const aboutOther = /\b(?:contract\s+start|tender|procurement|go-?live|milestone)\b/i.test(clause); + if (aboutOther && !aboutEnd) return false; + return aboutEnd; +} + +function stableSubjectIsWhole(text, index) { + const prefix = clauseAround(text.slice(0, index), index); + const subjects = [...prefix.matchAll(/\b(programme|program|project|delivery|phase|workstream|contract|procurement|milestones?|go-?live|tender|gate)\b/gi)]; + const nearest = subjects.at(-1)?.[1]; + return !nearest || /^(?:programme|program|project|delivery|schedule)$/i.test(nearest); +} + +function programmeStability(text, index) { + const clause = clauseAround(text.slice(0, index), index); + // Whole-programme subjects only; a programme's phase is still a phase. + if (/\b(?:phase|workstream|contract|procurement|milestones?|go-?live|tender|gate|(?:initial|full) operat(?:ing|ional) capability|in[ -]service(?: date)?)\b/i.test(clause)) return false; + const target = clauseAround(text, index).slice(clause.length); + if (/^(?:remains?\s+)?(?:on[ -](?:track|schedule|course|target)|progressing to plan)\s+(?:to|for)\b[^.;!?]*\b(?:phase|workstream|contract|procurement|milestones?|go-?live|tender|gate|(?:initial|full) operat(?:ing|ional) capability|in[ -]service(?: date)?)\b/i.test(target)) return false; + if (/^\s*$/i.test(clause) && /^(?:on[ -]schedule|no deviation)\b/i.test(text.slice(index))) return true; + return /\b(?:programme|program|project|delivery|schedule)\s+(?:(?:is|was|has|been|still|overall|delivery|schedule|baseline|continues?|continued|to|be|running|remains?|remained|progressing|firmly|currently|shows|encountered|experienced|suffered|facing)\s+)*$/i.test(clause); +} + +function isNegatedAt(text, index, negations) { + // Look a short way left of the match for "not / never / no longer". + const start = Math.max(0, index - 48); + const window = text.slice(start, index).toLowerCase(); + return negations.some(negation => new RegExp(`\\b${escapeRegExp(negation.toLowerCase())}\\s+(?:\\w+\\s+){0,3}$`).test(window)); +} + +function movePhraseTakesLandingDates(phrase) { + // "lengthened by" / "was extended" are direction-only; "increased from X to Y" lands on dates. + return /\b(from|to)\b/i.test(phrase) || /\bnow\s+forecast\b/i.test(phrase); +} + +function extractMoveStatements(text, movePhrases, dates) { + const moves = []; + const lower = text.toLowerCase(); + for (const phrase of movePhrases) { + const pattern = new RegExp(`\\b${escapeRegExp(phrase.toLowerCase()).replace(/\s+/g, "\\s+")}\\b`, "gi"); + for (const match of lower.matchAll(pattern)) { + const index = match.index; + // Only end-date / completion / finish moves count. + if (!phraseAboutEndDate(text, index) && !programmeStability(text, index)) continue; + if (!movePhraseTakesLandingDates(phrase)) { + moves.push({ from: null, to: null, index, phrase }); + continue; + } + // Take dates that sit near this move phrase (same clause / next ~120 chars). + const nearby = dates.filter(d => { + if (d.fyQuarter || d.precision === "quarter") return false; + if (d.role === "reporting") return false; + return d.index >= index - 10 && d.index <= index + 140; + }); + let from = null; + let to = null; + if (nearby.length >= 2) { + from = nearby[0].iso; + to = nearby[1].iso; + } else if (nearby.length === 1) { + to = nearby[0].iso; + } + moves.push({ from, to, index, phrase }); + } + } + return moves; +} + +function statedMoveDirection(phrase) { + const text = String(phrase || "").toLowerCase(); + // "earlier" cues first so "not extended" style phrases do not matter here. + if (/\b(decreased|reduced|shortened|brought\s+forward|pulled\s+(?:forward|in)|advanced|earlier|accelerated)\b/.test(text)) { + return "earlier"; + } + if (/\b(extended|lengthened|increased|slip|slipped|slippage|delay|delays|delayed|later|pushed|moved|changed|revised|re-baselined|correction|now\s+forecast)\b/.test(text)) { + return "later"; + } + return null; +} + +function actualMoveDirection(currentFinish, previousFinish) { + const delta = dayDeltaIso(currentFinish, previousFinish); + if (delta === null || delta === 0) return null; + return delta > 0 ? "later" : "earlier"; +} + +function moveLandsOnCurrent(moves, currentFinish) { + const current = toIsoDay(currentFinish); + if (!current || !moves.length) return false; + return moves.some(move => { + if (!move.to) return false; + const delta = dayDeltaIso(move.to, current); + return delta !== null && Math.abs(delta) <= 14; + }); +} + +function moveDirectionCovers(moves, currentFinish, previousFinish = null) { + // Direction-only phrase that agrees with the actual slide (no landing date). + if (!moves.length) return false; + const actual = actualMoveDirection(currentFinish, previousFinish); + if (!actual) return false; + return moves.some(move => { + if (move.to) return false; + const stated = statedMoveDirection(move.phrase); + return stated && stated === actual; + }); +} + +function moveCoversCurrent(moves, currentFinish, previousFinish = null) { + // Kept for callers / tests: landing date or agreeing direction-only phrase. + return moveLandsOnCurrent(moves, currentFinish) + || moveDirectionCovers(moves, currentFinish, previousFinish); +} + +function mistargetedMoveContradiction(moves, currentFinish) { + const current = toIsoDay(currentFinish); + if (!current || !moves.length) return null; + const withTo = moves.find(move => { + if (!move.to) return false; + const delta = dayDeltaIso(move.to, current); + return delta === null || Math.abs(delta) > 14; + }); + if (withTo) { + return { + kind: "date-mismatch", + detail: `The narrative says the end date moved to ${withTo.to}, but the published end date is ${current}.`, + }; + } + // Direction-only phrase that does not agree with the actual move. + if (moves.some(move => !move.to)) { + return { + kind: "date-mismatch", + detail: `The narrative says the end date moved, but the published end date is ${current}.`, + }; + } + return null; +} + +function detectScheduleClaims(text, { currentFinish = null, previousFinish = null } = {}) { + const rules = loadClaimRules(); + // Normalise before phrase / date matching so NBSP and double spaces do not hide hits. + const source = normaliseNarrativeText(text); + const dates = extractNarrativeDates(source); + const stableHits = findPhraseHits(source, rules.stablePhrases) + .filter(hit => !isNegatedAt(source, hit.index, rules.negations)) + .filter(hit => stableSubjectIsWhole(source, hit.index)) + .filter(hit => phraseAboutEndDate(source, hit.index) || programmeStability(source, hit.index)) + .filter(hit => { + // Being on track for a stated new finish is not a claim that it stayed unchanged. + if (!/on[ -](?:track|schedule|course|target)|progressing to plan/i.test(hit.phrase)) return true; + return !dates.some(d => d.role === "current-finish" + && (d.quarterStart ? quarterContainsFinish(d, currentFinish) : Math.abs(dayDeltaIso(d.iso, currentFinish) ?? Infinity) <= 14)); + }); + const movesStated = extractMoveStatements(source, rules.movePhrases, dates); + const finishMoved = (() => { + const delta = dayDeltaIso(currentFinish, previousFinish); + return delta !== null && delta !== 0; + })(); + const landed = moveLandsOnCurrent(movesStated, currentFinish); + const directionCovered = moveDirectionCovers(movesStated, currentFinish, previousFinish); + const covered = landed || directionCovered; + + let contradiction = null; + const current = toIsoDay(currentFinish); + // Only dates the narrative presents as the *current* finish drive mismatch. + // An actual closure also prompts a date check when the published finish is unchanged. + const currentFinishDates = dates.filter(d => d.role === "current-finish" || (!finishMoved && d.role === "actual-finish")); + + function mismatchedCurrentFinish() { + if (!current) return null; + const quarterHit = currentFinishDates.find(d => { + if (d.precision !== "quarter" && d.precision !== "year") return false; + return !quarterContainsFinish(d, current, 14); + }); + if (quarterHit) return quarterHit; + return currentFinishDates.find(d => { + if (d.fyQuarter) return false; + if (d.precision === "quarter" || d.precision === "year") return false; + const delta = dayDeltaIso(d.iso, current); + return delta !== null && Math.abs(delta) > 14; + }) || null; + } + + // Named current-finish that disagrees with the published finish wins over a + // direction-only "lengthened" cover — only a landing date clears it. + const mismatched = mismatchedCurrentFinish(); + // Populated when the finish did not move but the narrative names a different end date. + let publishedDateCheck = null; + if (!landed && mismatched) { + const narrativeDate = mismatched.precision === "quarter" + ? mismatched.quarterEnd + : mismatched.iso; + if (!finishMoved) { + // Finish did not move: ask the reader to check which date is current. + publishedDateCheck = { + narrativeDate, + publishedDate: current, + detail: `The narrative gives the end date as ${narrativeDate}; the published end date is ${current}. Check which is current.`, + }; + } else if (mismatched.precision === "quarter") { + contradiction = { + kind: "date-mismatch", + detail: `Narrative names ${mismatched.raw} (${mismatched.quarterStart}–${mismatched.quarterEnd}) but the current finish is ${current}.`, + }; + } else { + contradiction = { + kind: "date-mismatch", + detail: `Narrative names ${mismatched.raw} (${mismatched.iso}) but the current finish is ${current}.`, + }; + } + } + + // Stated move with a 'to' date that misses the published finish. + if (finishMoved && !contradiction && !landed && movesStated.length && current) { + const mistarget = movesStated.find(move => { + if (!move.to) return false; + const delta = dayDeltaIso(move.to, current); + return delta === null || Math.abs(delta) > 14; + }); + if (mistarget) { + contradiction = mistargetedMoveContradiction(movesStated, current); + } else if (!directionCovered && movesStated.some(move => !move.to) && !mismatched) { + contradiction = mistargetedMoveContradiction(movesStated, current); + } + } + + // Stability wording while the finish moved, and no move explains it. + if (!contradiction && finishMoved && stableHits.length && !covered && movesStated.length === 0) { + contradiction = { + kind: "says-unchanged", + detail: `Narrative claims stability (${stableHits[0].phrase}) while the finish moved from ${toIsoDay(previousFinish)} to ${toIsoDay(currentFinish)}.`, + }; + } + + // A move that lands on the published finish clears any contradiction. + if (landed) contradiction = null; + + // A previous-finish that disagrees with previousFinish is a note, not a contradiction. + let previousDateNote = null; + const previous = toIsoDay(previousFinish); + if (previous) { + const prevHit = dates.find(d => d.role === "previous-finish"); + if (prevHit) { + const delta = dayDeltaIso(prevHit.iso, previous); + if (delta !== null && Math.abs(delta) > 14) { + previousDateNote = { + narrativeDate: prevHit.iso, + previousFinish: previous, + detail: `The narrative gives last year's end date as ${prevHit.raw}; the published previous end date is ${previous}.`, + }; + } + } + } + + let evidence = null; + if (contradiction || publishedDateCheck) { + const hit = mismatched || (contradiction?.kind === "says-unchanged" ? stableHits[0] : movesStated[0]); + const original = String(text || ""); + // Map normalised character positions back to the submitted text, preserving its wording and spacing. + const tokens = [...original.matchAll(/\s+|\S/g)]; + const index = tokens[hit.index].index; + const end = tokens[hit.index + (hit.raw || hit.phrase).length]?.index ?? original.length; + const breaks = [...original.matchAll(/[.!?](?=\s|$)/g)]; + const sentenceStart = (breaks.filter(mark => mark.index < index).at(-1)?.index ?? -1) + 1; + const sentenceEnd = breaks.find(mark => mark.index >= end)?.index; + evidence = { + sentence: original.slice(sentenceStart, sentenceEnd === undefined ? original.length : sentenceEnd + 1).trim(), + phrase: original.slice(index, end), + ...(mismatched ? { narrativeDate: mismatched.iso } : {}), + previousFinish: toIsoDay(previousFinish), currentFinish: current, + }; + } + if (publishedDateCheck) { + publishedDateCheck.detail = findingSentence({ publishedDateCheck, evidence, dates }, { currentFinish, previousFinish }); + } + + return { + stable: stableHits, + movesStated, + dates, + contradiction, + previousDateNote, + publishedDateCheck, + evidence, + }; +} + +function findingSentence(claims, { currentFinish = null, previousFinish = null } = {}) { + const date = claims.dates?.find(d => d.iso === claims.evidence?.narrativeDate); + const narrativeDate = date?.precision ? date.raw : formatDate(parseDate(claims.evidence?.narrativeDate || claims.publishedDateCheck?.narrativeDate)); + if (claims.publishedDateCheck) { + const check = claims.publishedDateCheck; + return `The narrative gives the end date as ${narrativeDate}; the published end date is ${formatDate(parseDate(check.publishedDate))}. Check which is current.`; + } + if (claims.contradiction?.kind === "says-unchanged") { + return `The update says '${normaliseNarrativeText(claims.evidence.phrase)}'. The schedule's finish moved from ${formatDate(parseDate(previousFinish))} to ${formatDate(parseDate(currentFinish))} (${dayDeltaIso(currentFinish, previousFinish)} days).`; + } + if (claims.contradiction) { + if (claims.evidence.narrativeDate) return `The narrative gives the end date as ${narrativeDate}; the published end date is ${formatDate(parseDate(currentFinish))}. Check which is current.`; + return claims.contradiction.detail; + } + if (dayDeltaIso(currentFinish, previousFinish) && moveCoversCurrent(claims.movesStated, currentFinish, previousFinish)) return "The narrative explains the move."; + return null; +} + +function taskCodeSet(parsed) { + // Works for both assurance and review parse shapes. + if (parsed.taskByCode instanceof Map) return new Set(parsed.taskByCode.keys()); + return new Set((parsed.tasks || []).map(task => task.code).filter(Boolean)); +} + +function matchProjects(previousParsed, currentParsed) { + const previousCodes = taskCodeSet(previousParsed); + const currentCodes = taskCodeSet(currentParsed); + let shared = 0; + previousCodes.forEach(code => { + if (currentCodes.has(code)) shared += 1; + }); + const union = previousCodes.size + currentCodes.size - shared; + const score = union === 0 ? 0 : shared / union; + let decision = "different"; + if (score >= 0.8) decision = "same"; + else if (score >= 0.5) decision = "confirm"; + return { score, shared, decision }; +} + +function analyseReview(previous, current, narrative, options = {}) { + const identityMismatch = previous.project.name !== current.project.name || previous.project.id !== current.project.id; + if (identityMismatch) { + const match = matchProjects(previous, current); + if (match.decision === "different") { + // Keep the familiar wording when codes do not overlap, so reviewers still see why. + if (previous.project.name !== current.project.name) { + throw new Error("The project names differ. Choose previous and current exports of the same project before comparing."); + } + throw new Error("The project IDs differ. Choose exports of the same source project; re-imported projects with new IDs are not supported by this comparison."); + } + if (!options.confirmedMatch) { + const pct = Math.round(match.score * 100); + const err = new Error(`These look like the same project (${pct}% of activity codes match). Compare them?`); + err.code = "CONFIRM_PROJECT_MATCH"; + err.match = match; + throw err; + } + } + if (previous.sourceText === current.sourceText) throw new Error("These exports contain identical evidence. Choose a previous and a current schedule, then retry."); + if (!previous.project.dataDate || !current.project.dataDate) throw new Error("Both exports need a supported project data date before comparison."); + if (current.project.dataDate < previous.project.dataDate) throw new Error("The current data date precedes the previous export. Swap the files and retry."); + const finishMovement = dayDifference(current.project.scheduledFinish, previous.project.scheduledFinish); + const changes = taskChanges(previous, current); + const claims = detectScheduleClaims(narrative, { + currentFinish: current.project.scheduledFinish, + previousFinish: previous.project.scheduledFinish, + }); + const claim = findingSentence(claims, { + currentFinish: current.project.scheduledFinish, + previousFinish: previous.project.scheduledFinish, + }); + const blockers = []; + // Blank float on completed / WBS / LOE / finish-milestone rows is normal in P6 exports. + const floatComparable = task => { + if (/TK_Complete/i.test(task.status || "")) return false; + if (/TT_WBS|TT_LOE|TT_FinMile/i.test(task.type || "")) return false; + return true; + }; + const coverage = [previous, current].map(schedule => { + const comparable = schedule.tasks.filter(floatComparable); + return { + file: schedule.fileName, + tasks: schedule.tasks.length, + finishDates: schedule.tasks.filter(task => task.finish !== null).length, + floatValues: comparable.filter(task => task.float !== null).length, + floatExpected: comparable.length, + }; + }); + if (coverage.some(item => item.finishDates !== item.tasks || item.floatValues !== item.floatExpected)) { + blockers.push({ + type: "Evidence gap", + title: "Some activity finish dates or float values could not be compared", + detail: coverage.map(item => `${item.file}: ${item.finishDates}/${item.tasks} finishes and ${item.floatValues}/${item.floatExpected} comparable float values`).join("; "), + }); + } + + if (!narrative.trim()) { + blockers.push({ + type: "Evidence gap", + title: "No change narrative was supplied", + detail: "The schedules can show movement, but not the stated reason, mitigation or approval basis.", + }); + } + if (claims.contradiction && finishMovement !== null && Math.abs(finishMovement) > 0) { + blockers.push({ + type: "Contradiction", + title: claim, + detail: `${formatDate(previous.project.scheduledFinish)} → ${formatDate(current.project.scheduledFinish)}. ${claims.contradiction.detail}`, + }); + } else if (finishMovement !== null && Math.abs(finishMovement) >= 7) { + blockers.push({ type: "Schedule movement", title: `The scheduled finish moved ${finishMovement > 0 ? "+" : ""}${finishMovement} days`, detail: "Check the reason and supporting evidence. Mentioning the movement does not verify its cause." }); + } + if (changes.constraintChanges) { + blockers.push({ + type: "Unexplained change", + title: `${changes.constraintChanges} constraint changes need review`, + detail: "Constraint type or date changed. Inspect the source fields and the instruction supporting each change; narrative wording does not close this review question.", + }); + } + if (changes.relationChanges) { + blockers.push({ + type: "Unexplained change", + title: `${changes.relationChanges} links between tasks changed`, + detail: "Added or removed links between tasks (which task waits for which) can change the order of work. Ask which instruction explains the differences; these exports do not establish causation.", + }); + } + if (changes.floatErosion) { + blockers.push({ + type: "Float loss", + title: `Less spare time before the finish moves (float) on ${changes.floatErosion} changed activities`, + detail: "The current schedule shows less total float: these activities can slip less before they delay the finish. Check the underlying fields and planning assumptions; this does not prove a delay or a critical path.", + }); + } + const text = String(narrative || "").toLowerCase(); + const explicitMissingOwnership = /\b(?:no|without|missing|unassigned)\s+(?:named\s+)?(?:owner|due date)\b|\b(?:owner|due date)\s+(?:is\s+)?(?:missing|unassigned|unknown|not set)\b/.test(text); + if (explicitMissingOwnership || (/\b(manage\w*|mitigat\w*|governance|action)\b/.test(text) && !/\b(owner|responsible|accountable|due|by \d{1,2})\b/.test(text))) { + blockers.push({ + type: "Ownership gap", + title: "The stated response has no named owner or due date", + detail: "Name an owner and a date so someone can follow the mitigation up.", + }); + } + + return { + previous, + current, + finishMovement, + changes, + claims, + claim, + blockers, + coverage, + generatedAt: new Date().toISOString(), + }; +} + + + return { + parseXer: parseXerReview, + parseXerReview, + parseXerAssurance, + taskChanges, + analyseReview, + compareSchedules, + buildReview, + parseEvidenceText, + detectScheduleClaims, + findingSentence, + matchProjects, + decodeXerBytes, + listProjects, + loadClaimRules, + assessCompleteness, + pathCandidates, + reconcileDecisions, + compareBaseline, + numberValue, + parseDate, + formatDate, + dayDifference, + isoDate, + }; +})); diff --git a/docs/engine/xml-schedules.js b/docs/engine/xml-schedules.js new file mode 100644 index 0000000..e6dbc35 --- /dev/null +++ b/docs/engine/xml-schedules.js @@ -0,0 +1,297 @@ +/** + * P6 XML (PMXML) and MS Project MSPDI parsers. + * Returns the same assurance-shaped schedule object as parseXerAssurance. + * Uses DOMParser in the browser and a tiny tag reader in Node (no dependency). + */ +(function (root, factory) { + if (typeof module === "object" && module.exports) { + module.exports = factory(require("./projectlens-engine.js")); + } else { + factory(root.ProjectLensEngine); + } +}(typeof self !== "undefined" ? self : this, function (engine) { + "use strict"; + + function parseXmlDom(text) { + if (typeof DOMParser !== "undefined") { + const doc = new DOMParser().parseFromString(text, "application/xml"); + if (doc.querySelector("parsererror")) throw new Error("The XML schedule could not be parsed."); + return doc; + } + // Minimal Node fallback: wrap in a fake document with querySelectorAll via regex — too weak. + // Instead build a lightweight element tree. + return buildLightDom(text); + } + + function buildLightDom(text) { + // Strip comments and the XML declaration so nesting stays easy to walk. + const cleaned = String(text).replace(/<\?xml[^?]*\?>/i, "").replace(//g, ""); + const root = { name: "#document", children: [], attrs: {}, text: "" }; + const stack = [root]; + const token = /<\/?([A-Za-z_][\w:.-]*)([^>]*)>|([^<]+)/g; + let match; + while ((match = token.exec(cleaned))) { + if (match[3] !== undefined) { + const value = match[3].trim(); + if (value) stack[stack.length - 1].text += (stack[stack.length - 1].text ? " " : "") + value; + continue; + } + const name = match[1].replace(/^.*:/, ""); + const isClose = match[0].startsWith("$/.test(match[0]); + if (isClose) { + if (stack.length > 1) stack.pop(); + continue; + } + const node = { name, children: [], attrs: {}, text: "" }; + stack[stack.length - 1].children.push(node); + if (!selfClose) stack.push(node); + } + return { + querySelector(sel) { return findOne(root, sel); }, + querySelectorAll(sel) { return findAll(root, sel); }, + documentElement: root.children[0] || root, + }; + } + + function localName(node) { + return (node.name || node.localName || node.tagName || "").replace(/^.*:/, ""); + } + + function findAll(node, selector) { + // Supports "Tag" and "Tag Tag" (descendant) only — enough for these fixtures. + const parts = selector.trim().split(/\s+/).map(p => p.replace(/^.*:/, "")); + let current = [node]; + for (const part of parts) { + const next = []; + for (const item of current) walk(item, part, next); + current = next; + } + return current; + } + + function walk(node, name, out) { + const children = node.children || [...(node.children || [])]; + if (typeof node.querySelectorAll === "function" && node !== node) { + // unused + } + const list = node.children || []; + for (const child of list) { + if (localName(child) === name) out.push(child); + walk(child, name, out); + } + // Browser Element path + if (node.getElementsByTagName) { + // handled by real DOM + } + } + + function findOne(node, selector) { + return findAll(node, selector)[0] || null; + } + + function childText(parent, tag) { + if (!parent) return ""; + if (parent.getElementsByTagName) { + const list = parent.getElementsByTagName(tag); + // Prefer local-name match across namespaces. + for (let i = 0; i < list.length; i += 1) { + if (localName(list[i]) === tag && list[i].parentNode === parent) { + return (list[i].textContent || "").trim(); + } + } + // Descendant fallback + for (let i = 0; i < list.length; i += 1) { + if (localName(list[i]) === tag) return (list[i].textContent || "").trim(); + } + return ""; + } + const direct = (parent.children || []).find(c => localName(c) === tag); + return direct ? (direct.text || "").trim() : ""; + } + + function hoursValue(raw) { + if (!raw) return null; + const iso = String(raw).match(/PT(?:(\d+)H)?/i); + if (iso) return Number(iso[1] || 0); + const plain = String(raw).match(/(-?\d+(?:\.\d+)?)\s*h?/i); + return plain ? Number(plain[1]) : null; + } + + function elements(doc, tag) { + if (doc.getElementsByTagNameNS) { + const all = [...doc.getElementsByTagName("*")].filter(el => localName(el) === tag); + return all; + } + const root = doc.documentElement || doc; + const hits = findAll(root, tag); + // Include the document element itself when it is the requested tag (MSPDI root). + if (localName(root) === tag) hits.unshift(root); + return hits; + } + + function assuranceFromTasks({ fileName, text, project, tasks, relations }) { + const parseDate = engine.parseDate; + const numberValue = engine.numberValue; + return { + fileName, + sourceText: String(text || "").replace(/\r\n?/g, "\n").trim(), + project: { + id: project.id || "unassigned", + name: project.name || "Unnamed project", + dataDate: parseDate(project.dataDate), + scheduledFinish: parseDate(project.scheduledFinish), + }, + tasks: tasks.map(task => ({ + code: task.code, + name: task.name, + finish: parseDate(task.finish), + float: numberValue(task.float), + constraint: task.constraint || "", + constraintDate: parseDate(task.constraintDate), + status: task.status || "", + type: task.type || "", + start: parseDate(task.start), + duration: numberValue(task.duration), + id: task.id, + isMilestone: Boolean(task.isMilestone), + })), + taskByCode: null, + relations: new Set(relations.map(r => JSON.stringify([ + r.predecessorCode, + r.successorCode, + r.type || "PR_FS", + numberValue(r.lag) || 0, + ]))), + }; + } + + function finalise(schedule) { + schedule.taskByCode = new Map(schedule.tasks.map(task => [task.code, task])); + if (schedule.tasks.some(task => !task.code) || new Set(schedule.tasks.map(task => task.code)).size !== schedule.tasks.length) { + throw new Error(`${schedule.fileName} needs unique, non-empty activity codes for comparison.`); + } + if (!schedule.project.scheduledFinish) { + throw new Error(`${schedule.fileName} has no supported project scheduled finish.`); + } + return schedule; + } + + function parseP6Xml(text, fileName = "schedule.xml") { + if (!String(text || "").trim()) throw new Error(`${fileName} is empty.`); + const doc = parseXmlDom(text); + const projectEl = elements(doc, "Project")[0]; + if (!projectEl) throw new Error(`${fileName} is not a readable Primavera P6 XML schedule.`); + const activities = elements(doc, "Activity").filter(el => { + // Keep activities that sit under the project (avoid nested noise). + return true; + }); + const byId = new Map(); + const tasks = activities.map(el => { + const id = childText(el, "ObjectId") || childText(el, "Id"); + const code = childText(el, "Id") || id; + const type = childText(el, "Type") || "TT_Task"; + const task = { + id, + code, + name: childText(el, "Name") || code, + finish: childText(el, "RemainingEarlyFinishDate") || childText(el, "FinishDate"), + start: childText(el, "RemainingEarlyStartDate") || childText(el, "StartDate"), + float: hoursValue(childText(el, "TotalFloat")), + duration: hoursValue(childText(el, "PlannedDuration")), + status: childText(el, "Status"), + type: /mile/i.test(type) ? "TT_FinMile" : "TT_Task", + isMilestone: /mile/i.test(type), + constraint: "", + constraintDate: null, + }; + byId.set(String(id), task); + return task; + }); + const relations = elements(doc, "Relationship").map(el => { + const pred = byId.get(childText(el, "PredecessorActivityObjectId")); + const succ = byId.get(childText(el, "SuccessorActivityObjectId")); + return { + predecessorCode: pred?.code || childText(el, "PredecessorActivityObjectId"), + successorCode: succ?.code || childText(el, "SuccessorActivityObjectId"), + type: "PR_FS", + lag: hoursValue(childText(el, "Lag")) || 0, + }; + }); + return finalise(assuranceFromTasks({ + fileName, + text, + project: { + id: childText(projectEl, "ObjectId") || "1", + name: childText(projectEl, "Id") || childText(projectEl, "Name") || "Unnamed project", + dataDate: childText(projectEl, "DataDate"), + scheduledFinish: childText(projectEl, "ScheduledFinishDate") || childText(projectEl, "FinishDate"), + }, + tasks, + relations, + })); + } + + function parseMspdiXml(text, fileName = "schedule.xml") { + if (!String(text || "").trim()) throw new Error(`${fileName} is empty.`); + const doc = parseXmlDom(text); + const projectEl = elements(doc, "Project")[0]; + if (!projectEl) throw new Error(`${fileName} is not a readable MS Project XML (MSPDI) schedule.`); + const taskEls = elements(doc, "Task").filter(el => childText(el, "UID") && childText(el, "UID") !== "0"); + const byUid = new Map(); + const tasks = taskEls.map(el => { + const uid = childText(el, "UID"); + const code = childText(el, "WBS") || childText(el, "ID") || uid; + const milestone = childText(el, "Milestone") === "1"; + const task = { + id: uid, + code, + name: childText(el, "Name") || code, + finish: childText(el, "Finish"), + start: childText(el, "Start"), + float: hoursValue(childText(el, "TotalSlack")), + duration: hoursValue(childText(el, "Duration")), + status: "", + type: milestone ? "TT_FinMile" : "TT_Task", + isMilestone: milestone, + constraint: "", + constraintDate: null, + }; + byUid.set(uid, task); + return task; + }); + const relations = []; + for (const el of taskEls) { + const succ = byUid.get(childText(el, "UID")); + const links = el.getElementsByTagName + ? [...el.getElementsByTagName("*")].filter(n => localName(n) === "PredecessorLink" && n.parentNode === el) + : (el.children || []).filter(c => localName(c) === "PredecessorLink"); + for (const link of links) { + const predUid = childText(link, "PredecessorUID"); + const pred = byUid.get(predUid); + relations.push({ + predecessorCode: pred?.code || predUid, + successorCode: succ?.code || childText(el, "UID"), + type: "PR_FS", + lag: hoursValue(childText(link, "LinkLag")) || 0, + }); + } + } + return finalise(assuranceFromTasks({ + fileName, + text, + project: { + id: childText(projectEl, "UID") || "1", + name: childText(projectEl, "Name") || "Unnamed project", + dataDate: childText(projectEl, "CurrentDate") || childText(projectEl, "StartDate"), + scheduledFinish: childText(projectEl, "FinishDate"), + }, + tasks, + relations, + })); + } + + engine.parseP6Xml = parseP6Xml; + engine.parseMspdiXml = parseMspdiXml; + return { parseP6Xml, parseMspdiXml }; +})); diff --git a/docs/index.html b/docs/index.html index 0f17337..70008d1 100644 --- a/docs/index.html +++ b/docs/index.html @@ -220,6 +220,7 @@

    Start with the portfolio pulse

    Reading seven years of public project evidence…
    + diff --git a/docs/schedule-review.html b/docs/schedule-review.html index cb5817a..9d39519 100644 --- a/docs/schedule-review.html +++ b/docs/schedule-review.html @@ -73,14 +73,14 @@

    Compare two schedules
    with the narrative

    @@ -100,7 +100,7 @@

    Compare two schedules
    with the narrative

    + + + + diff --git a/docs/styles.css b/docs/styles.css index d352d39..847b851 100644 --- a/docs/styles.css +++ b/docs/styles.css @@ -188,3 +188,7 @@ dialog { padding: 0; border: 0; box-shadow: 0 28px 80px rgba(0,0,0,.4); } dialog /* Link to the main ProjectLens product, shown above the explorer at every width. */ .product-bar { margin: 0; padding: .75rem 1.25rem; background: #fff; color: #0b1933; border-bottom: 1px solid #d5dce6; font: 400 15px/1.5 "Libre Franklin", sans-serif; text-align: center; } .product-bar a { color: #0857e8; font-weight: 600; text-underline-offset: .2em; } + +/* Narrative claim notes on the GMPP project dialog. */ +.claim-flag { margin: 0 0 .8rem; padding: .7rem .85rem; background: rgba(255, 120, 40, .12); font-size: .72rem; line-height: 1.45; } +.claim-check { margin: 0 0 .8rem; padding: .55rem 0; color: var(--muted); font-size: .68rem; line-height: 1.45; } diff --git a/docs/vendor/jszip.LICENSE.md b/docs/vendor/jszip.LICENSE.md new file mode 100644 index 0000000..f8250b3 --- /dev/null +++ b/docs/vendor/jszip.LICENSE.md @@ -0,0 +1,651 @@ +JSZip is dual licensed. At your choice you may use it under the MIT license *or* the GPLv3 +license. + +The MIT License +=============== + +Copyright (c) 2009-2016 Stuart Knightley, David Duponchel, Franz Buchinger, António Afonso + +Permission is hereby granted, free of charge, to any person obtaining a copy +of this software and associated documentation files (the "Software"), to deal +in the Software without restriction, including without limitation the rights +to use, copy, modify, merge, publish, distribute, sublicense, and/or sell +copies of the Software, and to permit persons to whom the Software is +furnished to do so, subject to the following conditions: + +The above copyright notice and this permission notice shall be included in +all copies or substantial portions of the Software. + +THE SOFTWARE IS PROVIDED "AS IS", WITHOUT WARRANTY OF ANY KIND, EXPRESS OR +IMPLIED, INCLUDING BUT NOT LIMITED TO THE WARRANTIES OF MERCHANTABILITY, +FITNESS FOR A PARTICULAR PURPOSE AND NONINFRINGEMENT. IN NO EVENT SHALL THE +AUTHORS OR COPYRIGHT HOLDERS BE LIABLE FOR ANY CLAIM, DAMAGES OR OTHER +LIABILITY, WHETHER IN AN ACTION OF CONTRACT, TORT OR OTHERWISE, ARISING FROM, +OUT OF OR IN CONNECTION WITH THE SOFTWARE OR THE USE OR OTHER DEALINGS IN +THE SOFTWARE. + + +GPL version 3 +============= + + GNU GENERAL PUBLIC LICENSE + Version 3, 29 June 2007 + + Copyright (C) 2007 Free Software Foundation, Inc. + Everyone is permitted to copy and distribute verbatim copies + of this license document, but changing it is not allowed. + + Preamble + + The GNU General Public License is a free, copyleft license for +software and other kinds of works. + + The licenses for most software and other practical works are designed +to take away your freedom to share and change the works. By contrast, +the GNU General Public License is intended to guarantee your freedom to +share and change all versions of a program--to make sure it remains free +software for all its users. We, the Free Software Foundation, use the +GNU General Public License for most of our software; it applies also to +any other work released this way by its authors. You can apply it to +your programs, too. + + When we speak of free software, we are referring to freedom, not +price. Our General Public Licenses are designed to make sure that you +have the freedom to distribute copies of free software (and charge for +them if you wish), that you receive source code or can get it if you +want it, that you can change the software or use pieces of it in new +free programs, and that you know you can do these things. + + To protect your rights, we need to prevent others from denying you +these rights or asking you to surrender the rights. Therefore, you have +certain responsibilities if you distribute copies of the software, or if +you modify it: responsibilities to respect the freedom of others. + + For example, if you distribute copies of such a program, whether +gratis or for a fee, you must pass on to the recipients the same +freedoms that you received. You must make sure that they, too, receive +or can get the source code. And you must show them these terms so they +know their rights. + + Developers that use the GNU GPL protect your rights with two steps: +(1) assert copyright on the software, and (2) offer you this License +giving you legal permission to copy, distribute and/or modify it. + + For the developers' and authors' protection, the GPL clearly explains +that there is no warranty for this free software. For both users' and +authors' sake, the GPL requires that modified versions be marked as +changed, so that their problems will not be attributed erroneously to +authors of previous versions. + + Some devices are designed to deny users access to install or run +modified versions of the software inside them, although the manufacturer +can do so. This is fundamentally incompatible with the aim of +protecting users' freedom to change the software. The systematic +pattern of such abuse occurs in the area of products for individuals to +use, which is precisely where it is most unacceptable. Therefore, we +have designed this version of the GPL to prohibit the practice for those +products. If such problems arise substantially in other domains, we +stand ready to extend this provision to those domains in future versions +of the GPL, as needed to protect the freedom of users. + + Finally, every program is threatened constantly by software patents. +States should not allow patents to restrict development and use of +software on general-purpose computers, but in those that do, we wish to +avoid the special danger that patents applied to a free program could +make it effectively proprietary. To prevent this, the GPL assures that +patents cannot be used to render the program non-free. + + The precise terms and conditions for copying, distribution and +modification follow. + + TERMS AND CONDITIONS + + 0. Definitions. + + "This License" refers to version 3 of the GNU General Public License. + + "Copyright" also means copyright-like laws that apply to other kinds of +works, such as semiconductor masks. + + "The Program" refers to any copyrightable work licensed under this +License. Each licensee is addressed as "you". "Licensees" and +"recipients" may be individuals or organizations. + + To "modify" a work means to copy from or adapt all or part of the work +in a fashion requiring copyright permission, other than the making of an +exact copy. The resulting work is called a "modified version" of the +earlier work or a work "based on" the earlier work. + + A "covered work" means either the unmodified Program or a work based +on the Program. + + To "propagate" a work means to do anything with it that, without +permission, would make you directly or secondarily liable for +infringement under applicable copyright law, except executing it on a +computer or modifying a private copy. Propagation includes copying, +distribution (with or without modification), making available to the +public, and in some countries other activities as well. + + To "convey" a work means any kind of propagation that enables other +parties to make or receive copies. Mere interaction with a user through +a computer network, with no transfer of a copy, is not conveying. + + An interactive user interface displays "Appropriate Legal Notices" +to the extent that it includes a convenient and prominently visible +feature that (1) displays an appropriate copyright notice, and (2) +tells the user that there is no warranty for the work (except to the +extent that warranties are provided), that licensees may convey the +work under this License, and how to view a copy of this License. If +the interface presents a list of user commands or options, such as a +menu, a prominent item in the list meets this criterion. + + 1. Source Code. + + The "source code" for a work means the preferred form of the work +for making modifications to it. "Object code" means any non-source +form of a work. + + A "Standard Interface" means an interface that either is an official +standard defined by a recognized standards body, or, in the case of +interfaces specified for a particular programming language, one that +is widely used among developers working in that language. + + The "System Libraries" of an executable work include anything, other +than the work as a whole, that (a) is included in the normal form of +packaging a Major Component, but which is not part of that Major +Component, and (b) serves only to enable use of the work with that +Major Component, or to implement a Standard Interface for which an +implementation is available to the public in source code form. A +"Major Component", in this context, means a major essential component +(kernel, window system, and so on) of the specific operating system +(if any) on which the executable work runs, or a compiler used to +produce the work, or an object code interpreter used to run it. + + The "Corresponding Source" for a work in object code form means all +the source code needed to generate, install, and (for an executable +work) run the object code and to modify the work, including scripts to +control those activities. However, it does not include the work's +System Libraries, or general-purpose tools or generally available free +programs which are used unmodified in performing those activities but +which are not part of the work. For example, Corresponding Source +includes interface definition files associated with source files for +the work, and the source code for shared libraries and dynamically +linked subprograms that the work is specifically designed to require, +such as by intimate data communication or control flow between those +subprograms and other parts of the work. + + The Corresponding Source need not include anything that users +can regenerate automatically from other parts of the Corresponding +Source. + + The Corresponding Source for a work in source code form is that +same work. + + 2. Basic Permissions. + + All rights granted under this License are granted for the term of +copyright on the Program, and are irrevocable provided the stated +conditions are met. This License explicitly affirms your unlimited +permission to run the unmodified Program. The output from running a +covered work is covered by this License only if the output, given its +content, constitutes a covered work. This License acknowledges your +rights of fair use or other equivalent, as provided by copyright law. + + You may make, run and propagate covered works that you do not +convey, without conditions so long as your license otherwise remains +in force. You may convey covered works to others for the sole purpose +of having them make modifications exclusively for you, or provide you +with facilities for running those works, provided that you comply with +the terms of this License in conveying all material for which you do +not control copyright. Those thus making or running the covered works +for you must do so exclusively on your behalf, under your direction +and control, on terms that prohibit them from making any copies of +your copyrighted material outside their relationship with you. + + Conveying under any other circumstances is permitted solely under +the conditions stated below. Sublicensing is not allowed; section 10 +makes it unnecessary. + + 3. Protecting Users' Legal Rights From Anti-Circumvention Law. + + No covered work shall be deemed part of an effective technological +measure under any applicable law fulfilling obligations under article +11 of the WIPO copyright treaty adopted on 20 December 1996, or +similar laws prohibiting or restricting circumvention of such +measures. + + When you convey a covered work, you waive any legal power to forbid +circumvention of technological measures to the extent such circumvention +is effected by exercising rights under this License with respect to +the covered work, and you disclaim any intention to limit operation or +modification of the work as a means of enforcing, against the work's +users, your or third parties' legal rights to forbid circumvention of +technological measures. + + 4. Conveying Verbatim Copies. + + You may convey verbatim copies of the Program's source code as you +receive it, in any medium, provided that you conspicuously and +appropriately publish on each copy an appropriate copyright notice; +keep intact all notices stating that this License and any +non-permissive terms added in accord with section 7 apply to the code; +keep intact all notices of the absence of any warranty; and give all +recipients a copy of this License along with the Program. + + You may charge any price or no price for each copy that you convey, +and you may offer support or warranty protection for a fee. + + 5. Conveying Modified Source Versions. + + You may convey a work based on the Program, or the modifications to +produce it from the Program, in the form of source code under the +terms of section 4, provided that you also meet all of these conditions: + + a) The work must carry prominent notices stating that you modified + it, and giving a relevant date. + + b) The work must carry prominent notices stating that it is + released under this License and any conditions added under section + 7. This requirement modifies the requirement in section 4 to + "keep intact all notices". + + c) You must license the entire work, as a whole, under this + License to anyone who comes into possession of a copy. This + License will therefore apply, along with any applicable section 7 + additional terms, to the whole of the work, and all its parts, + regardless of how they are packaged. This License gives no + permission to license the work in any other way, but it does not + invalidate such permission if you have separately received it. + + d) If the work has interactive user interfaces, each must display + Appropriate Legal Notices; however, if the Program has interactive + interfaces that do not display Appropriate Legal Notices, your + work need not make them do so. + + A compilation of a covered work with other separate and independent +works, which are not by their nature extensions of the covered work, +and which are not combined with it such as to form a larger program, +in or on a volume of a storage or distribution medium, is called an +"aggregate" if the compilation and its resulting copyright are not +used to limit the access or legal rights of the compilation's users +beyond what the individual works permit. Inclusion of a covered work +in an aggregate does not cause this License to apply to the other +parts of the aggregate. + + 6. Conveying Non-Source Forms. + + You may convey a covered work in object code form under the terms +of sections 4 and 5, provided that you also convey the +machine-readable Corresponding Source under the terms of this License, +in one of these ways: + + a) Convey the object code in, or embodied in, a physical product + (including a physical distribution medium), accompanied by the + Corresponding Source fixed on a durable physical medium + customarily used for software interchange. + + b) Convey the object code in, or embodied in, a physical product + (including a physical distribution medium), accompanied by a + written offer, valid for at least three years and valid for as + long as you offer spare parts or customer support for that product + model, to give anyone who possesses the object code either (1) a + copy of the Corresponding Source for all the software in the + product that is covered by this License, on a durable physical + medium customarily used for software interchange, for a price no + more than your reasonable cost of physically performing this + conveying of source, or (2) access to copy the + Corresponding Source from a network server at no charge. + + c) Convey individual copies of the object code with a copy of the + written offer to provide the Corresponding Source. This + alternative is allowed only occasionally and noncommercially, and + only if you received the object code with such an offer, in accord + with subsection 6b. + + d) Convey the object code by offering access from a designated + place (gratis or for a charge), and offer equivalent access to the + Corresponding Source in the same way through the same place at no + further charge. You need not require recipients to copy the + Corresponding Source along with the object code. If the place to + copy the object code is a network server, the Corresponding Source + may be on a different server (operated by you or a third party) + that supports equivalent copying facilities, provided you maintain + clear directions next to the object code saying where to find the + Corresponding Source. Regardless of what server hosts the + Corresponding Source, you remain obligated to ensure that it is + available for as long as needed to satisfy these requirements. + + e) Convey the object code using peer-to-peer transmission, provided + you inform other peers where the object code and Corresponding + Source of the work are being offered to the general public at no + charge under subsection 6d. + + A separable portion of the object code, whose source code is excluded +from the Corresponding Source as a System Library, need not be +included in conveying the object code work. + + A "User Product" is either (1) a "consumer product", which means any +tangible personal property which is normally used for personal, family, +or household purposes, or (2) anything designed or sold for incorporation +into a dwelling. In determining whether a product is a consumer product, +doubtful cases shall be resolved in favor of coverage. For a particular +product received by a particular user, "normally used" refers to a +typical or common use of that class of product, regardless of the status +of the particular user or of the way in which the particular user +actually uses, or expects or is expected to use, the product. A product +is a consumer product regardless of whether the product has substantial +commercial, industrial or non-consumer uses, unless such uses represent +the only significant mode of use of the product. + + "Installation Information" for a User Product means any methods, +procedures, authorization keys, or other information required to install +and execute modified versions of a covered work in that User Product from +a modified version of its Corresponding Source. The information must +suffice to ensure that the continued functioning of the modified object +code is in no case prevented or interfered with solely because +modification has been made. + + If you convey an object code work under this section in, or with, or +specifically for use in, a User Product, and the conveying occurs as +part of a transaction in which the right of possession and use of the +User Product is transferred to the recipient in perpetuity or for a +fixed term (regardless of how the transaction is characterized), the +Corresponding Source conveyed under this section must be accompanied +by the Installation Information. But this requirement does not apply +if neither you nor any third party retains the ability to install +modified object code on the User Product (for example, the work has +been installed in ROM). + + The requirement to provide Installation Information does not include a +requirement to continue to provide support service, warranty, or updates +for a work that has been modified or installed by the recipient, or for +the User Product in which it has been modified or installed. Access to a +network may be denied when the modification itself materially and +adversely affects the operation of the network or violates the rules and +protocols for communication across the network. + + Corresponding Source conveyed, and Installation Information provided, +in accord with this section must be in a format that is publicly +documented (and with an implementation available to the public in +source code form), and must require no special password or key for +unpacking, reading or copying. + + 7. Additional Terms. + + "Additional permissions" are terms that supplement the terms of this +License by making exceptions from one or more of its conditions. +Additional permissions that are applicable to the entire Program shall +be treated as though they were included in this License, to the extent +that they are valid under applicable law. If additional permissions +apply only to part of the Program, that part may be used separately +under those permissions, but the entire Program remains governed by +this License without regard to the additional permissions. + + When you convey a copy of a covered work, you may at your option +remove any additional permissions from that copy, or from any part of +it. (Additional permissions may be written to require their own +removal in certain cases when you modify the work.) You may place +additional permissions on material, added by you to a covered work, +for which you have or can give appropriate copyright permission. + + Notwithstanding any other provision of this License, for material you +add to a covered work, you may (if authorized by the copyright holders of +that material) supplement the terms of this License with terms: + + a) Disclaiming warranty or limiting liability differently from the + terms of sections 15 and 16 of this License; or + + b) Requiring preservation of specified reasonable legal notices or + author attributions in that material or in the Appropriate Legal + Notices displayed by works containing it; or + + c) Prohibiting misrepresentation of the origin of that material, or + requiring that modified versions of such material be marked in + reasonable ways as different from the original version; or + + d) Limiting the use for publicity purposes of names of licensors or + authors of the material; or + + e) Declining to grant rights under trademark law for use of some + trade names, trademarks, or service marks; or + + f) Requiring indemnification of licensors and authors of that + material by anyone who conveys the material (or modified versions of + it) with contractual assumptions of liability to the recipient, for + any liability that these contractual assumptions directly impose on + those licensors and authors. + + All other non-permissive additional terms are considered "further +restrictions" within the meaning of section 10. If the Program as you +received it, or any part of it, contains a notice stating that it is +governed by this License along with a term that is a further +restriction, you may remove that term. If a license document contains +a further restriction but permits relicensing or conveying under this +License, you may add to a covered work material governed by the terms +of that license document, provided that the further restriction does +not survive such relicensing or conveying. + + If you add terms to a covered work in accord with this section, you +must place, in the relevant source files, a statement of the +additional terms that apply to those files, or a notice indicating +where to find the applicable terms. + + Additional terms, permissive or non-permissive, may be stated in the +form of a separately written license, or stated as exceptions; +the above requirements apply either way. + + 8. Termination. + + You may not propagate or modify a covered work except as expressly +provided under this License. Any attempt otherwise to propagate or +modify it is void, and will automatically terminate your rights under +this License (including any patent licenses granted under the third +paragraph of section 11). + + However, if you cease all violation of this License, then your +license from a particular copyright holder is reinstated (a) +provisionally, unless and until the copyright holder explicitly and +finally terminates your license, and (b) permanently, if the copyright +holder fails to notify you of the violation by some reasonable means +prior to 60 days after the cessation. + + Moreover, your license from a particular copyright holder is +reinstated permanently if the copyright holder notifies you of the +violation by some reasonable means, this is the first time you have +received notice of violation of this License (for any work) from that +copyright holder, and you cure the violation prior to 30 days after +your receipt of the notice. + + Termination of your rights under this section does not terminate the +licenses of parties who have received copies or rights from you under +this License. If your rights have been terminated and not permanently +reinstated, you do not qualify to receive new licenses for the same +material under section 10. + + 9. Acceptance Not Required for Having Copies. + + You are not required to accept this License in order to receive or +run a copy of the Program. Ancillary propagation of a covered work +occurring solely as a consequence of using peer-to-peer transmission +to receive a copy likewise does not require acceptance. However, +nothing other than this License grants you permission to propagate or +modify any covered work. These actions infringe copyright if you do +not accept this License. Therefore, by modifying or propagating a +covered work, you indicate your acceptance of this License to do so. + + 10. Automatic Licensing of Downstream Recipients. + + Each time you convey a covered work, the recipient automatically +receives a license from the original licensors, to run, modify and +propagate that work, subject to this License. You are not responsible +for enforcing compliance by third parties with this License. + + An "entity transaction" is a transaction transferring control of an +organization, or substantially all assets of one, or subdividing an +organization, or merging organizations. If propagation of a covered +work results from an entity transaction, each party to that +transaction who receives a copy of the work also receives whatever +licenses to the work the party's predecessor in interest had or could +give under the previous paragraph, plus a right to possession of the +Corresponding Source of the work from the predecessor in interest, if +the predecessor has it or can get it with reasonable efforts. + + You may not impose any further restrictions on the exercise of the +rights granted or affirmed under this License. For example, you may +not impose a license fee, royalty, or other charge for exercise of +rights granted under this License, and you may not initiate litigation +(including a cross-claim or counterclaim in a lawsuit) alleging that +any patent claim is infringed by making, using, selling, offering for +sale, or importing the Program or any portion of it. + + 11. Patents. + + A "contributor" is a copyright holder who authorizes use under this +License of the Program or a work on which the Program is based. The +work thus licensed is called the contributor's "contributor version". + + A contributor's "essential patent claims" are all patent claims +owned or controlled by the contributor, whether already acquired or +hereafter acquired, that would be infringed by some manner, permitted +by this License, of making, using, or selling its contributor version, +but do not include claims that would be infringed only as a +consequence of further modification of the contributor version. For +purposes of this definition, "control" includes the right to grant +patent sublicenses in a manner consistent with the requirements of +this License. + + Each contributor grants you a non-exclusive, worldwide, royalty-free +patent license under the contributor's essential patent claims, to +make, use, sell, offer for sale, import and otherwise run, modify and +propagate the contents of its contributor version. + + In the following three paragraphs, a "patent license" is any express +agreement or commitment, however denominated, not to enforce a patent +(such as an express permission to practice a patent or covenant not to +sue for patent infringement). To "grant" such a patent license to a +party means to make such an agreement or commitment not to enforce a +patent against the party. + + If you convey a covered work, knowingly relying on a patent license, +and the Corresponding Source of the work is not available for anyone +to copy, free of charge and under the terms of this License, through a +publicly available network server or other readily accessible means, +then you must either (1) cause the Corresponding Source to be so +available, or (2) arrange to deprive yourself of the benefit of the +patent license for this particular work, or (3) arrange, in a manner +consistent with the requirements of this License, to extend the patent +license to downstream recipients. "Knowingly relying" means you have +actual knowledge that, but for the patent license, your conveying the +covered work in a country, or your recipient's use of the covered work +in a country, would infringe one or more identifiable patents in that +country that you have reason to believe are valid. + + If, pursuant to or in connection with a single transaction or +arrangement, you convey, or propagate by procuring conveyance of, a +covered work, and grant a patent license to some of the parties +receiving the covered work authorizing them to use, propagate, modify +or convey a specific copy of the covered work, then the patent license +you grant is automatically extended to all recipients of the covered +work and works based on it. + + A patent license is "discriminatory" if it does not include within +the scope of its coverage, prohibits the exercise of, or is +conditioned on the non-exercise of one or more of the rights that are +specifically granted under this License. You may not convey a covered +work if you are a party to an arrangement with a third party that is +in the business of distributing software, under which you make payment +to the third party based on the extent of your activity of conveying +the work, and under which the third party grants, to any of the +parties who would receive the covered work from you, a discriminatory +patent license (a) in connection with copies of the covered work +conveyed by you (or copies made from those copies), or (b) primarily +for and in connection with specific products or compilations that +contain the covered work, unless you entered into that arrangement, +or that patent license was granted, prior to 28 March 2007. + + Nothing in this License shall be construed as excluding or limiting +any implied license or other defenses to infringement that may +otherwise be available to you under applicable patent law. + + 12. No Surrender of Others' Freedom. + + If conditions are imposed on you (whether by court order, agreement or +otherwise) that contradict the conditions of this License, they do not +excuse you from the conditions of this License. If you cannot convey a +covered work so as to satisfy simultaneously your obligations under this +License and any other pertinent obligations, then as a consequence you may +not convey it at all. For example, if you agree to terms that obligate you +to collect a royalty for further conveying from those to whom you convey +the Program, the only way you could satisfy both those terms and this +License would be to refrain entirely from conveying the Program. + + 13. Use with the GNU Affero General Public License. + + Notwithstanding any other provision of this License, you have +permission to link or combine any covered work with a work licensed +under version 3 of the GNU Affero General Public License into a single +combined work, and to convey the resulting work. The terms of this +License will continue to apply to the part which is the covered work, +but the special requirements of the GNU Affero General Public License, +section 13, concerning interaction through a network will apply to the +combination as such. + + 14. Revised Versions of this License. + + The Free Software Foundation may publish revised and/or new versions of +the GNU General Public License from time to time. Such new versions will +be similar in spirit to the present version, but may differ in detail to +address new problems or concerns. + + Each version is given a distinguishing version number. If the +Program specifies that a certain numbered version of the GNU General +Public License "or any later version" applies to it, you have the +option of following the terms and conditions either of that numbered +version or of any later version published by the Free Software +Foundation. If the Program does not specify a version number of the +GNU General Public License, you may choose any version ever published +by the Free Software Foundation. + + If the Program specifies that a proxy can decide which future +versions of the GNU General Public License can be used, that proxy's +public statement of acceptance of a version permanently authorizes you +to choose that version for the Program. + + Later license versions may give you additional or different +permissions. However, no additional obligations are imposed on any +author or copyright holder as a result of your choosing to follow a +later version. + + 15. Disclaimer of Warranty. + + THERE IS NO WARRANTY FOR THE PROGRAM, TO THE EXTENT PERMITTED BY +APPLICABLE LAW. EXCEPT WHEN OTHERWISE STATED IN WRITING THE COPYRIGHT +HOLDERS AND/OR OTHER PARTIES PROVIDE THE PROGRAM "AS IS" WITHOUT WARRANTY +OF ANY KIND, EITHER EXPRESSED OR IMPLIED, INCLUDING, BUT NOT LIMITED TO, +THE IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR +PURPOSE. THE ENTIRE RISK AS TO THE QUALITY AND PERFORMANCE OF THE PROGRAM +IS WITH YOU. SHOULD THE PROGRAM PROVE DEFECTIVE, YOU ASSUME THE COST OF +ALL NECESSARY SERVICING, REPAIR OR CORRECTION. + + 16. Limitation of Liability. + + IN NO EVENT UNLESS REQUIRED BY APPLICABLE LAW OR AGREED TO IN WRITING +WILL ANY COPYRIGHT HOLDER, OR ANY OTHER PARTY WHO MODIFIES AND/OR CONVEYS +THE PROGRAM AS PERMITTED ABOVE, BE LIABLE TO YOU FOR DAMAGES, INCLUDING ANY +GENERAL, SPECIAL, INCIDENTAL OR CONSEQUENTIAL DAMAGES ARISING OUT OF THE +USE OR INABILITY TO USE THE PROGRAM (INCLUDING BUT NOT LIMITED TO LOSS OF +DATA OR DATA BEING RENDERED INACCURATE OR LOSSES SUSTAINED BY YOU OR THIRD +PARTIES OR A FAILURE OF THE PROGRAM TO OPERATE WITH ANY OTHER PROGRAMS), +EVEN IF SUCH HOLDER OR OTHER PARTY HAS BEEN ADVISED OF THE POSSIBILITY OF +SUCH DAMAGES. + + 17. Interpretation of Sections 15 and 16. + + If the disclaimer of warranty and limitation of liability provided +above cannot be given local legal effect according to their terms, +reviewing courts shall apply local law that most closely approximates +an absolute waiver of all civil liability in connection with the +Program, unless a warranty or assumption of liability accompanies a +copy of the Program in return for a fee. + + END OF TERMS AND CONDITIONS diff --git a/docs/vendor/jszip.min.js b/docs/vendor/jszip.min.js new file mode 100644 index 0000000..ff4cfd5 --- /dev/null +++ b/docs/vendor/jszip.min.js @@ -0,0 +1,13 @@ +/*! + +JSZip v3.10.1 - A JavaScript class for generating and reading zip files + + +(c) 2009-2016 Stuart Knightley +Dual licenced under the MIT license or GPLv3. See https://raw.github.com/Stuk/jszip/main/LICENSE.markdown. + +JSZip uses the library pako released under the MIT license : +https://github.com/nodeca/pako/blob/main/LICENSE +*/ + +!function(e){if("object"==typeof exports&&"undefined"!=typeof module)module.exports=e();else if("function"==typeof define&&define.amd)define([],e);else{("undefined"!=typeof window?window:"undefined"!=typeof global?global:"undefined"!=typeof self?self:this).JSZip=e()}}(function(){return function s(a,o,h){function u(r,e){if(!o[r]){if(!a[r]){var t="function"==typeof require&&require;if(!e&&t)return t(r,!0);if(l)return l(r,!0);var n=new Error("Cannot find module '"+r+"'");throw n.code="MODULE_NOT_FOUND",n}var i=o[r]={exports:{}};a[r][0].call(i.exports,function(e){var t=a[r][1][e];return u(t||e)},i,i.exports,s,a,o,h)}return o[r].exports}for(var l="function"==typeof require&&require,e=0;e>2,s=(3&t)<<4|r>>4,a=1>6:64,o=2>4,r=(15&i)<<4|(s=p.indexOf(e.charAt(o++)))>>2,n=(3&s)<<6|(a=p.indexOf(e.charAt(o++))),l[h++]=t,64!==s&&(l[h++]=r),64!==a&&(l[h++]=n);return l}},{"./support":30,"./utils":32}],2:[function(e,t,r){"use strict";var n=e("./external"),i=e("./stream/DataWorker"),s=e("./stream/Crc32Probe"),a=e("./stream/DataLengthProbe");function o(e,t,r,n,i){this.compressedSize=e,this.uncompressedSize=t,this.crc32=r,this.compression=n,this.compressedContent=i}o.prototype={getContentWorker:function(){var e=new i(n.Promise.resolve(this.compressedContent)).pipe(this.compression.uncompressWorker()).pipe(new a("data_length")),t=this;return e.on("end",function(){if(this.streamInfo.data_length!==t.uncompressedSize)throw new Error("Bug : uncompressed data size mismatch")}),e},getCompressedWorker:function(){return new i(n.Promise.resolve(this.compressedContent)).withStreamInfo("compressedSize",this.compressedSize).withStreamInfo("uncompressedSize",this.uncompressedSize).withStreamInfo("crc32",this.crc32).withStreamInfo("compression",this.compression)}},o.createWorkerFrom=function(e,t,r){return e.pipe(new s).pipe(new a("uncompressedSize")).pipe(t.compressWorker(r)).pipe(new a("compressedSize")).withStreamInfo("compression",t)},t.exports=o},{"./external":6,"./stream/Crc32Probe":25,"./stream/DataLengthProbe":26,"./stream/DataWorker":27}],3:[function(e,t,r){"use strict";var n=e("./stream/GenericWorker");r.STORE={magic:"\0\0",compressWorker:function(){return new n("STORE compression")},uncompressWorker:function(){return new n("STORE decompression")}},r.DEFLATE=e("./flate")},{"./flate":7,"./stream/GenericWorker":28}],4:[function(e,t,r){"use strict";var n=e("./utils");var o=function(){for(var e,t=[],r=0;r<256;r++){e=r;for(var n=0;n<8;n++)e=1&e?3988292384^e>>>1:e>>>1;t[r]=e}return t}();t.exports=function(e,t){return void 0!==e&&e.length?"string"!==n.getTypeOf(e)?function(e,t,r,n){var i=o,s=n+r;e^=-1;for(var a=n;a>>8^i[255&(e^t[a])];return-1^e}(0|t,e,e.length,0):function(e,t,r,n){var i=o,s=n+r;e^=-1;for(var a=n;a>>8^i[255&(e^t.charCodeAt(a))];return-1^e}(0|t,e,e.length,0):0}},{"./utils":32}],5:[function(e,t,r){"use strict";r.base64=!1,r.binary=!1,r.dir=!1,r.createFolders=!0,r.date=null,r.compression=null,r.compressionOptions=null,r.comment=null,r.unixPermissions=null,r.dosPermissions=null},{}],6:[function(e,t,r){"use strict";var n=null;n="undefined"!=typeof Promise?Promise:e("lie"),t.exports={Promise:n}},{lie:37}],7:[function(e,t,r){"use strict";var n="undefined"!=typeof Uint8Array&&"undefined"!=typeof Uint16Array&&"undefined"!=typeof Uint32Array,i=e("pako"),s=e("./utils"),a=e("./stream/GenericWorker"),o=n?"uint8array":"array";function h(e,t){a.call(this,"FlateWorker/"+e),this._pako=null,this._pakoAction=e,this._pakoOptions=t,this.meta={}}r.magic="\b\0",s.inherits(h,a),h.prototype.processChunk=function(e){this.meta=e.meta,null===this._pako&&this._createPako(),this._pako.push(s.transformTo(o,e.data),!1)},h.prototype.flush=function(){a.prototype.flush.call(this),null===this._pako&&this._createPako(),this._pako.push([],!0)},h.prototype.cleanUp=function(){a.prototype.cleanUp.call(this),this._pako=null},h.prototype._createPako=function(){this._pako=new i[this._pakoAction]({raw:!0,level:this._pakoOptions.level||-1});var t=this;this._pako.onData=function(e){t.push({data:e,meta:t.meta})}},r.compressWorker=function(e){return new h("Deflate",e)},r.uncompressWorker=function(){return new h("Inflate",{})}},{"./stream/GenericWorker":28,"./utils":32,pako:38}],8:[function(e,t,r){"use strict";function A(e,t){var r,n="";for(r=0;r>>=8;return n}function n(e,t,r,n,i,s){var a,o,h=e.file,u=e.compression,l=s!==O.utf8encode,f=I.transformTo("string",s(h.name)),c=I.transformTo("string",O.utf8encode(h.name)),d=h.comment,p=I.transformTo("string",s(d)),m=I.transformTo("string",O.utf8encode(d)),_=c.length!==h.name.length,g=m.length!==d.length,b="",v="",y="",w=h.dir,k=h.date,x={crc32:0,compressedSize:0,uncompressedSize:0};t&&!r||(x.crc32=e.crc32,x.compressedSize=e.compressedSize,x.uncompressedSize=e.uncompressedSize);var S=0;t&&(S|=8),l||!_&&!g||(S|=2048);var z=0,C=0;w&&(z|=16),"UNIX"===i?(C=798,z|=function(e,t){var r=e;return e||(r=t?16893:33204),(65535&r)<<16}(h.unixPermissions,w)):(C=20,z|=function(e){return 63&(e||0)}(h.dosPermissions)),a=k.getUTCHours(),a<<=6,a|=k.getUTCMinutes(),a<<=5,a|=k.getUTCSeconds()/2,o=k.getUTCFullYear()-1980,o<<=4,o|=k.getUTCMonth()+1,o<<=5,o|=k.getUTCDate(),_&&(v=A(1,1)+A(B(f),4)+c,b+="up"+A(v.length,2)+v),g&&(y=A(1,1)+A(B(p),4)+m,b+="uc"+A(y.length,2)+y);var E="";return E+="\n\0",E+=A(S,2),E+=u.magic,E+=A(a,2),E+=A(o,2),E+=A(x.crc32,4),E+=A(x.compressedSize,4),E+=A(x.uncompressedSize,4),E+=A(f.length,2),E+=A(b.length,2),{fileRecord:R.LOCAL_FILE_HEADER+E+f+b,dirRecord:R.CENTRAL_FILE_HEADER+A(C,2)+E+A(p.length,2)+"\0\0\0\0"+A(z,4)+A(n,4)+f+b+p}}var I=e("../utils"),i=e("../stream/GenericWorker"),O=e("../utf8"),B=e("../crc32"),R=e("../signature");function s(e,t,r,n){i.call(this,"ZipFileWorker"),this.bytesWritten=0,this.zipComment=t,this.zipPlatform=r,this.encodeFileName=n,this.streamFiles=e,this.accumulate=!1,this.contentBuffer=[],this.dirRecords=[],this.currentSourceOffset=0,this.entriesCount=0,this.currentFile=null,this._sources=[]}I.inherits(s,i),s.prototype.push=function(e){var t=e.meta.percent||0,r=this.entriesCount,n=this._sources.length;this.accumulate?this.contentBuffer.push(e):(this.bytesWritten+=e.data.length,i.prototype.push.call(this,{data:e.data,meta:{currentFile:this.currentFile,percent:r?(t+100*(r-n-1))/r:100}}))},s.prototype.openedSource=function(e){this.currentSourceOffset=this.bytesWritten,this.currentFile=e.file.name;var t=this.streamFiles&&!e.file.dir;if(t){var r=n(e,t,!1,this.currentSourceOffset,this.zipPlatform,this.encodeFileName);this.push({data:r.fileRecord,meta:{percent:0}})}else this.accumulate=!0},s.prototype.closedSource=function(e){this.accumulate=!1;var t=this.streamFiles&&!e.file.dir,r=n(e,t,!0,this.currentSourceOffset,this.zipPlatform,this.encodeFileName);if(this.dirRecords.push(r.dirRecord),t)this.push({data:function(e){return R.DATA_DESCRIPTOR+A(e.crc32,4)+A(e.compressedSize,4)+A(e.uncompressedSize,4)}(e),meta:{percent:100}});else for(this.push({data:r.fileRecord,meta:{percent:0}});this.contentBuffer.length;)this.push(this.contentBuffer.shift());this.currentFile=null},s.prototype.flush=function(){for(var e=this.bytesWritten,t=0;t=this.index;t--)r=(r<<8)+this.byteAt(t);return this.index+=e,r},readString:function(e){return n.transformTo("string",this.readData(e))},readData:function(){},lastIndexOfSignature:function(){},readAndCheckSignature:function(){},readDate:function(){var e=this.readInt(4);return new Date(Date.UTC(1980+(e>>25&127),(e>>21&15)-1,e>>16&31,e>>11&31,e>>5&63,(31&e)<<1))}},t.exports=i},{"../utils":32}],19:[function(e,t,r){"use strict";var n=e("./Uint8ArrayReader");function i(e){n.call(this,e)}e("../utils").inherits(i,n),i.prototype.readData=function(e){this.checkOffset(e);var t=this.data.slice(this.zero+this.index,this.zero+this.index+e);return this.index+=e,t},t.exports=i},{"../utils":32,"./Uint8ArrayReader":21}],20:[function(e,t,r){"use strict";var n=e("./DataReader");function i(e){n.call(this,e)}e("../utils").inherits(i,n),i.prototype.byteAt=function(e){return this.data.charCodeAt(this.zero+e)},i.prototype.lastIndexOfSignature=function(e){return this.data.lastIndexOf(e)-this.zero},i.prototype.readAndCheckSignature=function(e){return e===this.readData(4)},i.prototype.readData=function(e){this.checkOffset(e);var t=this.data.slice(this.zero+this.index,this.zero+this.index+e);return this.index+=e,t},t.exports=i},{"../utils":32,"./DataReader":18}],21:[function(e,t,r){"use strict";var n=e("./ArrayReader");function i(e){n.call(this,e)}e("../utils").inherits(i,n),i.prototype.readData=function(e){if(this.checkOffset(e),0===e)return new Uint8Array(0);var t=this.data.subarray(this.zero+this.index,this.zero+this.index+e);return this.index+=e,t},t.exports=i},{"../utils":32,"./ArrayReader":17}],22:[function(e,t,r){"use strict";var n=e("../utils"),i=e("../support"),s=e("./ArrayReader"),a=e("./StringReader"),o=e("./NodeBufferReader"),h=e("./Uint8ArrayReader");t.exports=function(e){var t=n.getTypeOf(e);return n.checkSupport(t),"string"!==t||i.uint8array?"nodebuffer"===t?new o(e):i.uint8array?new h(n.transformTo("uint8array",e)):new s(n.transformTo("array",e)):new a(e)}},{"../support":30,"../utils":32,"./ArrayReader":17,"./NodeBufferReader":19,"./StringReader":20,"./Uint8ArrayReader":21}],23:[function(e,t,r){"use strict";r.LOCAL_FILE_HEADER="PK",r.CENTRAL_FILE_HEADER="PK",r.CENTRAL_DIRECTORY_END="PK",r.ZIP64_CENTRAL_DIRECTORY_LOCATOR="PK",r.ZIP64_CENTRAL_DIRECTORY_END="PK",r.DATA_DESCRIPTOR="PK\b"},{}],24:[function(e,t,r){"use strict";var n=e("./GenericWorker"),i=e("../utils");function s(e){n.call(this,"ConvertWorker to "+e),this.destType=e}i.inherits(s,n),s.prototype.processChunk=function(e){this.push({data:i.transformTo(this.destType,e.data),meta:e.meta})},t.exports=s},{"../utils":32,"./GenericWorker":28}],25:[function(e,t,r){"use strict";var n=e("./GenericWorker"),i=e("../crc32");function s(){n.call(this,"Crc32Probe"),this.withStreamInfo("crc32",0)}e("../utils").inherits(s,n),s.prototype.processChunk=function(e){this.streamInfo.crc32=i(e.data,this.streamInfo.crc32||0),this.push(e)},t.exports=s},{"../crc32":4,"../utils":32,"./GenericWorker":28}],26:[function(e,t,r){"use strict";var n=e("../utils"),i=e("./GenericWorker");function s(e){i.call(this,"DataLengthProbe for "+e),this.propName=e,this.withStreamInfo(e,0)}n.inherits(s,i),s.prototype.processChunk=function(e){if(e){var t=this.streamInfo[this.propName]||0;this.streamInfo[this.propName]=t+e.data.length}i.prototype.processChunk.call(this,e)},t.exports=s},{"../utils":32,"./GenericWorker":28}],27:[function(e,t,r){"use strict";var n=e("../utils"),i=e("./GenericWorker");function s(e){i.call(this,"DataWorker");var t=this;this.dataIsReady=!1,this.index=0,this.max=0,this.data=null,this.type="",this._tickScheduled=!1,e.then(function(e){t.dataIsReady=!0,t.data=e,t.max=e&&e.length||0,t.type=n.getTypeOf(e),t.isPaused||t._tickAndRepeat()},function(e){t.error(e)})}n.inherits(s,i),s.prototype.cleanUp=function(){i.prototype.cleanUp.call(this),this.data=null},s.prototype.resume=function(){return!!i.prototype.resume.call(this)&&(!this._tickScheduled&&this.dataIsReady&&(this._tickScheduled=!0,n.delay(this._tickAndRepeat,[],this)),!0)},s.prototype._tickAndRepeat=function(){this._tickScheduled=!1,this.isPaused||this.isFinished||(this._tick(),this.isFinished||(n.delay(this._tickAndRepeat,[],this),this._tickScheduled=!0))},s.prototype._tick=function(){if(this.isPaused||this.isFinished)return!1;var e=null,t=Math.min(this.max,this.index+16384);if(this.index>=this.max)return this.end();switch(this.type){case"string":e=this.data.substring(this.index,t);break;case"uint8array":e=this.data.subarray(this.index,t);break;case"array":case"nodebuffer":e=this.data.slice(this.index,t)}return this.index=t,this.push({data:e,meta:{percent:this.max?this.index/this.max*100:0}})},t.exports=s},{"../utils":32,"./GenericWorker":28}],28:[function(e,t,r){"use strict";function n(e){this.name=e||"default",this.streamInfo={},this.generatedError=null,this.extraStreamInfo={},this.isPaused=!0,this.isFinished=!1,this.isLocked=!1,this._listeners={data:[],end:[],error:[]},this.previous=null}n.prototype={push:function(e){this.emit("data",e)},end:function(){if(this.isFinished)return!1;this.flush();try{this.emit("end"),this.cleanUp(),this.isFinished=!0}catch(e){this.emit("error",e)}return!0},error:function(e){return!this.isFinished&&(this.isPaused?this.generatedError=e:(this.isFinished=!0,this.emit("error",e),this.previous&&this.previous.error(e),this.cleanUp()),!0)},on:function(e,t){return this._listeners[e].push(t),this},cleanUp:function(){this.streamInfo=this.generatedError=this.extraStreamInfo=null,this._listeners=[]},emit:function(e,t){if(this._listeners[e])for(var r=0;r "+e:e}},t.exports=n},{}],29:[function(e,t,r){"use strict";var h=e("../utils"),i=e("./ConvertWorker"),s=e("./GenericWorker"),u=e("../base64"),n=e("../support"),a=e("../external"),o=null;if(n.nodestream)try{o=e("../nodejs/NodejsStreamOutputAdapter")}catch(e){}function l(e,o){return new a.Promise(function(t,r){var n=[],i=e._internalType,s=e._outputType,a=e._mimeType;e.on("data",function(e,t){n.push(e),o&&o(t)}).on("error",function(e){n=[],r(e)}).on("end",function(){try{var e=function(e,t,r){switch(e){case"blob":return h.newBlob(h.transformTo("arraybuffer",t),r);case"base64":return u.encode(t);default:return h.transformTo(e,t)}}(s,function(e,t){var r,n=0,i=null,s=0;for(r=0;r>>6:(r<65536?t[s++]=224|r>>>12:(t[s++]=240|r>>>18,t[s++]=128|r>>>12&63),t[s++]=128|r>>>6&63),t[s++]=128|63&r);return t}(e)},s.utf8decode=function(e){return h.nodebuffer?o.transformTo("nodebuffer",e).toString("utf-8"):function(e){var t,r,n,i,s=e.length,a=new Array(2*s);for(t=r=0;t>10&1023,a[r++]=56320|1023&n)}return a.length!==r&&(a.subarray?a=a.subarray(0,r):a.length=r),o.applyFromCharCode(a)}(e=o.transformTo(h.uint8array?"uint8array":"array",e))},o.inherits(a,n),a.prototype.processChunk=function(e){var t=o.transformTo(h.uint8array?"uint8array":"array",e.data);if(this.leftOver&&this.leftOver.length){if(h.uint8array){var r=t;(t=new Uint8Array(r.length+this.leftOver.length)).set(this.leftOver,0),t.set(r,this.leftOver.length)}else t=this.leftOver.concat(t);this.leftOver=null}var n=function(e,t){var r;for((t=t||e.length)>e.length&&(t=e.length),r=t-1;0<=r&&128==(192&e[r]);)r--;return r<0?t:0===r?t:r+u[e[r]]>t?r:t}(t),i=t;n!==t.length&&(h.uint8array?(i=t.subarray(0,n),this.leftOver=t.subarray(n,t.length)):(i=t.slice(0,n),this.leftOver=t.slice(n,t.length))),this.push({data:s.utf8decode(i),meta:e.meta})},a.prototype.flush=function(){this.leftOver&&this.leftOver.length&&(this.push({data:s.utf8decode(this.leftOver),meta:{}}),this.leftOver=null)},s.Utf8DecodeWorker=a,o.inherits(l,n),l.prototype.processChunk=function(e){this.push({data:s.utf8encode(e.data),meta:e.meta})},s.Utf8EncodeWorker=l},{"./nodejsUtils":14,"./stream/GenericWorker":28,"./support":30,"./utils":32}],32:[function(e,t,a){"use strict";var o=e("./support"),h=e("./base64"),r=e("./nodejsUtils"),u=e("./external");function n(e){return e}function l(e,t){for(var r=0;r>8;this.dir=!!(16&this.externalFileAttributes),0==e&&(this.dosPermissions=63&this.externalFileAttributes),3==e&&(this.unixPermissions=this.externalFileAttributes>>16&65535),this.dir||"/"!==this.fileNameStr.slice(-1)||(this.dir=!0)},parseZIP64ExtraField:function(){if(this.extraFields[1]){var e=n(this.extraFields[1].value);this.uncompressedSize===s.MAX_VALUE_32BITS&&(this.uncompressedSize=e.readInt(8)),this.compressedSize===s.MAX_VALUE_32BITS&&(this.compressedSize=e.readInt(8)),this.localHeaderOffset===s.MAX_VALUE_32BITS&&(this.localHeaderOffset=e.readInt(8)),this.diskNumberStart===s.MAX_VALUE_32BITS&&(this.diskNumberStart=e.readInt(4))}},readExtraFields:function(e){var t,r,n,i=e.index+this.extraFieldsLength;for(this.extraFields||(this.extraFields={});e.index+4>>6:(r<65536?t[s++]=224|r>>>12:(t[s++]=240|r>>>18,t[s++]=128|r>>>12&63),t[s++]=128|r>>>6&63),t[s++]=128|63&r);return t},r.buf2binstring=function(e){return l(e,e.length)},r.binstring2buf=function(e){for(var t=new h.Buf8(e.length),r=0,n=t.length;r>10&1023,o[n++]=56320|1023&i)}return l(o,n)},r.utf8border=function(e,t){var r;for((t=t||e.length)>e.length&&(t=e.length),r=t-1;0<=r&&128==(192&e[r]);)r--;return r<0?t:0===r?t:r+u[e[r]]>t?r:t}},{"./common":41}],43:[function(e,t,r){"use strict";t.exports=function(e,t,r,n){for(var i=65535&e|0,s=e>>>16&65535|0,a=0;0!==r;){for(r-=a=2e3>>1:e>>>1;t[r]=e}return t}();t.exports=function(e,t,r,n){var i=o,s=n+r;e^=-1;for(var a=n;a>>8^i[255&(e^t[a])];return-1^e}},{}],46:[function(e,t,r){"use strict";var h,c=e("../utils/common"),u=e("./trees"),d=e("./adler32"),p=e("./crc32"),n=e("./messages"),l=0,f=4,m=0,_=-2,g=-1,b=4,i=2,v=8,y=9,s=286,a=30,o=19,w=2*s+1,k=15,x=3,S=258,z=S+x+1,C=42,E=113,A=1,I=2,O=3,B=4;function R(e,t){return e.msg=n[t],t}function T(e){return(e<<1)-(4e.avail_out&&(r=e.avail_out),0!==r&&(c.arraySet(e.output,t.pending_buf,t.pending_out,r,e.next_out),e.next_out+=r,t.pending_out+=r,e.total_out+=r,e.avail_out-=r,t.pending-=r,0===t.pending&&(t.pending_out=0))}function N(e,t){u._tr_flush_block(e,0<=e.block_start?e.block_start:-1,e.strstart-e.block_start,t),e.block_start=e.strstart,F(e.strm)}function U(e,t){e.pending_buf[e.pending++]=t}function P(e,t){e.pending_buf[e.pending++]=t>>>8&255,e.pending_buf[e.pending++]=255&t}function L(e,t){var r,n,i=e.max_chain_length,s=e.strstart,a=e.prev_length,o=e.nice_match,h=e.strstart>e.w_size-z?e.strstart-(e.w_size-z):0,u=e.window,l=e.w_mask,f=e.prev,c=e.strstart+S,d=u[s+a-1],p=u[s+a];e.prev_length>=e.good_match&&(i>>=2),o>e.lookahead&&(o=e.lookahead);do{if(u[(r=t)+a]===p&&u[r+a-1]===d&&u[r]===u[s]&&u[++r]===u[s+1]){s+=2,r++;do{}while(u[++s]===u[++r]&&u[++s]===u[++r]&&u[++s]===u[++r]&&u[++s]===u[++r]&&u[++s]===u[++r]&&u[++s]===u[++r]&&u[++s]===u[++r]&&u[++s]===u[++r]&&sh&&0!=--i);return a<=e.lookahead?a:e.lookahead}function j(e){var t,r,n,i,s,a,o,h,u,l,f=e.w_size;do{if(i=e.window_size-e.lookahead-e.strstart,e.strstart>=f+(f-z)){for(c.arraySet(e.window,e.window,f,f,0),e.match_start-=f,e.strstart-=f,e.block_start-=f,t=r=e.hash_size;n=e.head[--t],e.head[t]=f<=n?n-f:0,--r;);for(t=r=f;n=e.prev[--t],e.prev[t]=f<=n?n-f:0,--r;);i+=f}if(0===e.strm.avail_in)break;if(a=e.strm,o=e.window,h=e.strstart+e.lookahead,u=i,l=void 0,l=a.avail_in,u=x)for(s=e.strstart-e.insert,e.ins_h=e.window[s],e.ins_h=(e.ins_h<=x&&(e.ins_h=(e.ins_h<=x)if(n=u._tr_tally(e,e.strstart-e.match_start,e.match_length-x),e.lookahead-=e.match_length,e.match_length<=e.max_lazy_match&&e.lookahead>=x){for(e.match_length--;e.strstart++,e.ins_h=(e.ins_h<=x&&(e.ins_h=(e.ins_h<=x&&e.match_length<=e.prev_length){for(i=e.strstart+e.lookahead-x,n=u._tr_tally(e,e.strstart-1-e.prev_match,e.prev_length-x),e.lookahead-=e.prev_length-1,e.prev_length-=2;++e.strstart<=i&&(e.ins_h=(e.ins_h<e.pending_buf_size-5&&(r=e.pending_buf_size-5);;){if(e.lookahead<=1){if(j(e),0===e.lookahead&&t===l)return A;if(0===e.lookahead)break}e.strstart+=e.lookahead,e.lookahead=0;var n=e.block_start+r;if((0===e.strstart||e.strstart>=n)&&(e.lookahead=e.strstart-n,e.strstart=n,N(e,!1),0===e.strm.avail_out))return A;if(e.strstart-e.block_start>=e.w_size-z&&(N(e,!1),0===e.strm.avail_out))return A}return e.insert=0,t===f?(N(e,!0),0===e.strm.avail_out?O:B):(e.strstart>e.block_start&&(N(e,!1),e.strm.avail_out),A)}),new M(4,4,8,4,Z),new M(4,5,16,8,Z),new M(4,6,32,32,Z),new M(4,4,16,16,W),new M(8,16,32,32,W),new M(8,16,128,128,W),new M(8,32,128,256,W),new M(32,128,258,1024,W),new M(32,258,258,4096,W)],r.deflateInit=function(e,t){return Y(e,t,v,15,8,0)},r.deflateInit2=Y,r.deflateReset=K,r.deflateResetKeep=G,r.deflateSetHeader=function(e,t){return e&&e.state?2!==e.state.wrap?_:(e.state.gzhead=t,m):_},r.deflate=function(e,t){var r,n,i,s;if(!e||!e.state||5>8&255),U(n,n.gzhead.time>>16&255),U(n,n.gzhead.time>>24&255),U(n,9===n.level?2:2<=n.strategy||n.level<2?4:0),U(n,255&n.gzhead.os),n.gzhead.extra&&n.gzhead.extra.length&&(U(n,255&n.gzhead.extra.length),U(n,n.gzhead.extra.length>>8&255)),n.gzhead.hcrc&&(e.adler=p(e.adler,n.pending_buf,n.pending,0)),n.gzindex=0,n.status=69):(U(n,0),U(n,0),U(n,0),U(n,0),U(n,0),U(n,9===n.level?2:2<=n.strategy||n.level<2?4:0),U(n,3),n.status=E);else{var a=v+(n.w_bits-8<<4)<<8;a|=(2<=n.strategy||n.level<2?0:n.level<6?1:6===n.level?2:3)<<6,0!==n.strstart&&(a|=32),a+=31-a%31,n.status=E,P(n,a),0!==n.strstart&&(P(n,e.adler>>>16),P(n,65535&e.adler)),e.adler=1}if(69===n.status)if(n.gzhead.extra){for(i=n.pending;n.gzindex<(65535&n.gzhead.extra.length)&&(n.pending!==n.pending_buf_size||(n.gzhead.hcrc&&n.pending>i&&(e.adler=p(e.adler,n.pending_buf,n.pending-i,i)),F(e),i=n.pending,n.pending!==n.pending_buf_size));)U(n,255&n.gzhead.extra[n.gzindex]),n.gzindex++;n.gzhead.hcrc&&n.pending>i&&(e.adler=p(e.adler,n.pending_buf,n.pending-i,i)),n.gzindex===n.gzhead.extra.length&&(n.gzindex=0,n.status=73)}else n.status=73;if(73===n.status)if(n.gzhead.name){i=n.pending;do{if(n.pending===n.pending_buf_size&&(n.gzhead.hcrc&&n.pending>i&&(e.adler=p(e.adler,n.pending_buf,n.pending-i,i)),F(e),i=n.pending,n.pending===n.pending_buf_size)){s=1;break}s=n.gzindexi&&(e.adler=p(e.adler,n.pending_buf,n.pending-i,i)),0===s&&(n.gzindex=0,n.status=91)}else n.status=91;if(91===n.status)if(n.gzhead.comment){i=n.pending;do{if(n.pending===n.pending_buf_size&&(n.gzhead.hcrc&&n.pending>i&&(e.adler=p(e.adler,n.pending_buf,n.pending-i,i)),F(e),i=n.pending,n.pending===n.pending_buf_size)){s=1;break}s=n.gzindexi&&(e.adler=p(e.adler,n.pending_buf,n.pending-i,i)),0===s&&(n.status=103)}else n.status=103;if(103===n.status&&(n.gzhead.hcrc?(n.pending+2>n.pending_buf_size&&F(e),n.pending+2<=n.pending_buf_size&&(U(n,255&e.adler),U(n,e.adler>>8&255),e.adler=0,n.status=E)):n.status=E),0!==n.pending){if(F(e),0===e.avail_out)return n.last_flush=-1,m}else if(0===e.avail_in&&T(t)<=T(r)&&t!==f)return R(e,-5);if(666===n.status&&0!==e.avail_in)return R(e,-5);if(0!==e.avail_in||0!==n.lookahead||t!==l&&666!==n.status){var o=2===n.strategy?function(e,t){for(var r;;){if(0===e.lookahead&&(j(e),0===e.lookahead)){if(t===l)return A;break}if(e.match_length=0,r=u._tr_tally(e,0,e.window[e.strstart]),e.lookahead--,e.strstart++,r&&(N(e,!1),0===e.strm.avail_out))return A}return e.insert=0,t===f?(N(e,!0),0===e.strm.avail_out?O:B):e.last_lit&&(N(e,!1),0===e.strm.avail_out)?A:I}(n,t):3===n.strategy?function(e,t){for(var r,n,i,s,a=e.window;;){if(e.lookahead<=S){if(j(e),e.lookahead<=S&&t===l)return A;if(0===e.lookahead)break}if(e.match_length=0,e.lookahead>=x&&0e.lookahead&&(e.match_length=e.lookahead)}if(e.match_length>=x?(r=u._tr_tally(e,1,e.match_length-x),e.lookahead-=e.match_length,e.strstart+=e.match_length,e.match_length=0):(r=u._tr_tally(e,0,e.window[e.strstart]),e.lookahead--,e.strstart++),r&&(N(e,!1),0===e.strm.avail_out))return A}return e.insert=0,t===f?(N(e,!0),0===e.strm.avail_out?O:B):e.last_lit&&(N(e,!1),0===e.strm.avail_out)?A:I}(n,t):h[n.level].func(n,t);if(o!==O&&o!==B||(n.status=666),o===A||o===O)return 0===e.avail_out&&(n.last_flush=-1),m;if(o===I&&(1===t?u._tr_align(n):5!==t&&(u._tr_stored_block(n,0,0,!1),3===t&&(D(n.head),0===n.lookahead&&(n.strstart=0,n.block_start=0,n.insert=0))),F(e),0===e.avail_out))return n.last_flush=-1,m}return t!==f?m:n.wrap<=0?1:(2===n.wrap?(U(n,255&e.adler),U(n,e.adler>>8&255),U(n,e.adler>>16&255),U(n,e.adler>>24&255),U(n,255&e.total_in),U(n,e.total_in>>8&255),U(n,e.total_in>>16&255),U(n,e.total_in>>24&255)):(P(n,e.adler>>>16),P(n,65535&e.adler)),F(e),0=r.w_size&&(0===s&&(D(r.head),r.strstart=0,r.block_start=0,r.insert=0),u=new c.Buf8(r.w_size),c.arraySet(u,t,l-r.w_size,r.w_size,0),t=u,l=r.w_size),a=e.avail_in,o=e.next_in,h=e.input,e.avail_in=l,e.next_in=0,e.input=t,j(r);r.lookahead>=x;){for(n=r.strstart,i=r.lookahead-(x-1);r.ins_h=(r.ins_h<>>=y=v>>>24,p-=y,0===(y=v>>>16&255))C[s++]=65535&v;else{if(!(16&y)){if(0==(64&y)){v=m[(65535&v)+(d&(1<>>=y,p-=y),p<15&&(d+=z[n++]<>>=y=v>>>24,p-=y,!(16&(y=v>>>16&255))){if(0==(64&y)){v=_[(65535&v)+(d&(1<>>=y,p-=y,(y=s-a)>3,d&=(1<<(p-=w<<3))-1,e.next_in=n,e.next_out=s,e.avail_in=n>>24&255)+(e>>>8&65280)+((65280&e)<<8)+((255&e)<<24)}function s(){this.mode=0,this.last=!1,this.wrap=0,this.havedict=!1,this.flags=0,this.dmax=0,this.check=0,this.total=0,this.head=null,this.wbits=0,this.wsize=0,this.whave=0,this.wnext=0,this.window=null,this.hold=0,this.bits=0,this.length=0,this.offset=0,this.extra=0,this.lencode=null,this.distcode=null,this.lenbits=0,this.distbits=0,this.ncode=0,this.nlen=0,this.ndist=0,this.have=0,this.next=null,this.lens=new I.Buf16(320),this.work=new I.Buf16(288),this.lendyn=null,this.distdyn=null,this.sane=0,this.back=0,this.was=0}function a(e){var t;return e&&e.state?(t=e.state,e.total_in=e.total_out=t.total=0,e.msg="",t.wrap&&(e.adler=1&t.wrap),t.mode=P,t.last=0,t.havedict=0,t.dmax=32768,t.head=null,t.hold=0,t.bits=0,t.lencode=t.lendyn=new I.Buf32(n),t.distcode=t.distdyn=new I.Buf32(i),t.sane=1,t.back=-1,N):U}function o(e){var t;return e&&e.state?((t=e.state).wsize=0,t.whave=0,t.wnext=0,a(e)):U}function h(e,t){var r,n;return e&&e.state?(n=e.state,t<0?(r=0,t=-t):(r=1+(t>>4),t<48&&(t&=15)),t&&(t<8||15=s.wsize?(I.arraySet(s.window,t,r-s.wsize,s.wsize,0),s.wnext=0,s.whave=s.wsize):(n<(i=s.wsize-s.wnext)&&(i=n),I.arraySet(s.window,t,r-n,i,s.wnext),(n-=i)?(I.arraySet(s.window,t,r-n,n,0),s.wnext=n,s.whave=s.wsize):(s.wnext+=i,s.wnext===s.wsize&&(s.wnext=0),s.whave>>8&255,r.check=B(r.check,E,2,0),l=u=0,r.mode=2;break}if(r.flags=0,r.head&&(r.head.done=!1),!(1&r.wrap)||(((255&u)<<8)+(u>>8))%31){e.msg="incorrect header check",r.mode=30;break}if(8!=(15&u)){e.msg="unknown compression method",r.mode=30;break}if(l-=4,k=8+(15&(u>>>=4)),0===r.wbits)r.wbits=k;else if(k>r.wbits){e.msg="invalid window size",r.mode=30;break}r.dmax=1<>8&1),512&r.flags&&(E[0]=255&u,E[1]=u>>>8&255,r.check=B(r.check,E,2,0)),l=u=0,r.mode=3;case 3:for(;l<32;){if(0===o)break e;o--,u+=n[s++]<>>8&255,E[2]=u>>>16&255,E[3]=u>>>24&255,r.check=B(r.check,E,4,0)),l=u=0,r.mode=4;case 4:for(;l<16;){if(0===o)break e;o--,u+=n[s++]<>8),512&r.flags&&(E[0]=255&u,E[1]=u>>>8&255,r.check=B(r.check,E,2,0)),l=u=0,r.mode=5;case 5:if(1024&r.flags){for(;l<16;){if(0===o)break e;o--,u+=n[s++]<>>8&255,r.check=B(r.check,E,2,0)),l=u=0}else r.head&&(r.head.extra=null);r.mode=6;case 6:if(1024&r.flags&&(o<(d=r.length)&&(d=o),d&&(r.head&&(k=r.head.extra_len-r.length,r.head.extra||(r.head.extra=new Array(r.head.extra_len)),I.arraySet(r.head.extra,n,s,d,k)),512&r.flags&&(r.check=B(r.check,n,d,s)),o-=d,s+=d,r.length-=d),r.length))break e;r.length=0,r.mode=7;case 7:if(2048&r.flags){if(0===o)break e;for(d=0;k=n[s+d++],r.head&&k&&r.length<65536&&(r.head.name+=String.fromCharCode(k)),k&&d>9&1,r.head.done=!0),e.adler=r.check=0,r.mode=12;break;case 10:for(;l<32;){if(0===o)break e;o--,u+=n[s++]<>>=7&l,l-=7&l,r.mode=27;break}for(;l<3;){if(0===o)break e;o--,u+=n[s++]<>>=1)){case 0:r.mode=14;break;case 1:if(j(r),r.mode=20,6!==t)break;u>>>=2,l-=2;break e;case 2:r.mode=17;break;case 3:e.msg="invalid block type",r.mode=30}u>>>=2,l-=2;break;case 14:for(u>>>=7&l,l-=7&l;l<32;){if(0===o)break e;o--,u+=n[s++]<>>16^65535)){e.msg="invalid stored block lengths",r.mode=30;break}if(r.length=65535&u,l=u=0,r.mode=15,6===t)break e;case 15:r.mode=16;case 16:if(d=r.length){if(o>>=5,l-=5,r.ndist=1+(31&u),u>>>=5,l-=5,r.ncode=4+(15&u),u>>>=4,l-=4,286>>=3,l-=3}for(;r.have<19;)r.lens[A[r.have++]]=0;if(r.lencode=r.lendyn,r.lenbits=7,S={bits:r.lenbits},x=T(0,r.lens,0,19,r.lencode,0,r.work,S),r.lenbits=S.bits,x){e.msg="invalid code lengths set",r.mode=30;break}r.have=0,r.mode=19;case 19:for(;r.have>>16&255,b=65535&C,!((_=C>>>24)<=l);){if(0===o)break e;o--,u+=n[s++]<>>=_,l-=_,r.lens[r.have++]=b;else{if(16===b){for(z=_+2;l>>=_,l-=_,0===r.have){e.msg="invalid bit length repeat",r.mode=30;break}k=r.lens[r.have-1],d=3+(3&u),u>>>=2,l-=2}else if(17===b){for(z=_+3;l>>=_)),u>>>=3,l-=3}else{for(z=_+7;l>>=_)),u>>>=7,l-=7}if(r.have+d>r.nlen+r.ndist){e.msg="invalid bit length repeat",r.mode=30;break}for(;d--;)r.lens[r.have++]=k}}if(30===r.mode)break;if(0===r.lens[256]){e.msg="invalid code -- missing end-of-block",r.mode=30;break}if(r.lenbits=9,S={bits:r.lenbits},x=T(D,r.lens,0,r.nlen,r.lencode,0,r.work,S),r.lenbits=S.bits,x){e.msg="invalid literal/lengths set",r.mode=30;break}if(r.distbits=6,r.distcode=r.distdyn,S={bits:r.distbits},x=T(F,r.lens,r.nlen,r.ndist,r.distcode,0,r.work,S),r.distbits=S.bits,x){e.msg="invalid distances set",r.mode=30;break}if(r.mode=20,6===t)break e;case 20:r.mode=21;case 21:if(6<=o&&258<=h){e.next_out=a,e.avail_out=h,e.next_in=s,e.avail_in=o,r.hold=u,r.bits=l,R(e,c),a=e.next_out,i=e.output,h=e.avail_out,s=e.next_in,n=e.input,o=e.avail_in,u=r.hold,l=r.bits,12===r.mode&&(r.back=-1);break}for(r.back=0;g=(C=r.lencode[u&(1<>>16&255,b=65535&C,!((_=C>>>24)<=l);){if(0===o)break e;o--,u+=n[s++]<>v)])>>>16&255,b=65535&C,!(v+(_=C>>>24)<=l);){if(0===o)break e;o--,u+=n[s++]<>>=v,l-=v,r.back+=v}if(u>>>=_,l-=_,r.back+=_,r.length=b,0===g){r.mode=26;break}if(32&g){r.back=-1,r.mode=12;break}if(64&g){e.msg="invalid literal/length code",r.mode=30;break}r.extra=15&g,r.mode=22;case 22:if(r.extra){for(z=r.extra;l>>=r.extra,l-=r.extra,r.back+=r.extra}r.was=r.length,r.mode=23;case 23:for(;g=(C=r.distcode[u&(1<>>16&255,b=65535&C,!((_=C>>>24)<=l);){if(0===o)break e;o--,u+=n[s++]<>v)])>>>16&255,b=65535&C,!(v+(_=C>>>24)<=l);){if(0===o)break e;o--,u+=n[s++]<>>=v,l-=v,r.back+=v}if(u>>>=_,l-=_,r.back+=_,64&g){e.msg="invalid distance code",r.mode=30;break}r.offset=b,r.extra=15&g,r.mode=24;case 24:if(r.extra){for(z=r.extra;l>>=r.extra,l-=r.extra,r.back+=r.extra}if(r.offset>r.dmax){e.msg="invalid distance too far back",r.mode=30;break}r.mode=25;case 25:if(0===h)break e;if(d=c-h,r.offset>d){if((d=r.offset-d)>r.whave&&r.sane){e.msg="invalid distance too far back",r.mode=30;break}p=d>r.wnext?(d-=r.wnext,r.wsize-d):r.wnext-d,d>r.length&&(d=r.length),m=r.window}else m=i,p=a-r.offset,d=r.length;for(hd?(m=R[T+a[v]],A[I+a[v]]):(m=96,0),h=1<>S)+(u-=h)]=p<<24|m<<16|_|0,0!==u;);for(h=1<>=1;if(0!==h?(E&=h-1,E+=h):E=0,v++,0==--O[b]){if(b===w)break;b=t[r+a[v]]}if(k>>7)]}function U(e,t){e.pending_buf[e.pending++]=255&t,e.pending_buf[e.pending++]=t>>>8&255}function P(e,t,r){e.bi_valid>d-r?(e.bi_buf|=t<>d-e.bi_valid,e.bi_valid+=r-d):(e.bi_buf|=t<>>=1,r<<=1,0<--t;);return r>>>1}function Z(e,t,r){var n,i,s=new Array(g+1),a=0;for(n=1;n<=g;n++)s[n]=a=a+r[n-1]<<1;for(i=0;i<=t;i++){var o=e[2*i+1];0!==o&&(e[2*i]=j(s[o]++,o))}}function W(e){var t;for(t=0;t>1;1<=r;r--)G(e,s,r);for(i=h;r=e.heap[1],e.heap[1]=e.heap[e.heap_len--],G(e,s,1),n=e.heap[1],e.heap[--e.heap_max]=r,e.heap[--e.heap_max]=n,s[2*i]=s[2*r]+s[2*n],e.depth[i]=(e.depth[r]>=e.depth[n]?e.depth[r]:e.depth[n])+1,s[2*r+1]=s[2*n+1]=i,e.heap[1]=i++,G(e,s,1),2<=e.heap_len;);e.heap[--e.heap_max]=e.heap[1],function(e,t){var r,n,i,s,a,o,h=t.dyn_tree,u=t.max_code,l=t.stat_desc.static_tree,f=t.stat_desc.has_stree,c=t.stat_desc.extra_bits,d=t.stat_desc.extra_base,p=t.stat_desc.max_length,m=0;for(s=0;s<=g;s++)e.bl_count[s]=0;for(h[2*e.heap[e.heap_max]+1]=0,r=e.heap_max+1;r<_;r++)p<(s=h[2*h[2*(n=e.heap[r])+1]+1]+1)&&(s=p,m++),h[2*n+1]=s,u>=7;n>>=1)if(1&r&&0!==e.dyn_ltree[2*t])return o;if(0!==e.dyn_ltree[18]||0!==e.dyn_ltree[20]||0!==e.dyn_ltree[26])return h;for(t=32;t>>3,(s=e.static_len+3+7>>>3)<=i&&(i=s)):i=s=r+5,r+4<=i&&-1!==t?J(e,t,r,n):4===e.strategy||s===i?(P(e,2+(n?1:0),3),K(e,z,C)):(P(e,4+(n?1:0),3),function(e,t,r,n){var i;for(P(e,t-257,5),P(e,r-1,5),P(e,n-4,4),i=0;i>>8&255,e.pending_buf[e.d_buf+2*e.last_lit+1]=255&t,e.pending_buf[e.l_buf+e.last_lit]=255&r,e.last_lit++,0===t?e.dyn_ltree[2*r]++:(e.matches++,t--,e.dyn_ltree[2*(A[r]+u+1)]++,e.dyn_dtree[2*N(t)]++),e.last_lit===e.lit_bufsize-1},r._tr_align=function(e){P(e,2,3),L(e,m,z),function(e){16===e.bi_valid?(U(e,e.bi_buf),e.bi_buf=0,e.bi_valid=0):8<=e.bi_valid&&(e.pending_buf[e.pending++]=255&e.bi_buf,e.bi_buf>>=8,e.bi_valid-=8)}(e)}},{"../utils/common":41}],53:[function(e,t,r){"use strict";t.exports=function(){this.input=null,this.next_in=0,this.avail_in=0,this.total_in=0,this.output=null,this.next_out=0,this.avail_out=0,this.total_out=0,this.msg="",this.state=null,this.data_type=2,this.adler=0}},{}],54:[function(e,t,r){(function(e){!function(r,n){"use strict";if(!r.setImmediate){var i,s,t,a,o=1,h={},u=!1,l=r.document,e=Object.getPrototypeOf&&Object.getPrototypeOf(r);e=e&&e.setTimeout?e:r,i="[object process]"==={}.toString.call(r.process)?function(e){process.nextTick(function(){c(e)})}:function(){if(r.postMessage&&!r.importScripts){var e=!0,t=r.onmessage;return r.onmessage=function(){e=!1},r.postMessage("","*"),r.onmessage=t,e}}()?(a="setImmediate$"+Math.random()+"$",r.addEventListener?r.addEventListener("message",d,!1):r.attachEvent("onmessage",d),function(e){r.postMessage(a+e,"*")}):r.MessageChannel?((t=new MessageChannel).port1.onmessage=function(e){c(e.data)},function(e){t.port2.postMessage(e)}):l&&"onreadystatechange"in l.createElement("script")?(s=l.documentElement,function(e){var t=l.createElement("script");t.onreadystatechange=function(){c(e),t.onreadystatechange=null,s.removeChild(t),t=null},s.appendChild(t)}):function(e){setTimeout(c,0,e)},e.setImmediate=function(e){"function"!=typeof e&&(e=new Function(""+e));for(var t=new Array(arguments.length-1),r=0;r toast.classList.remove("show"), 3600); } -function numberValue(value) { - if (value === null || value === undefined || value === "") return null; - const number = Number(String(value).replace(/,/g, "")); - return Number.isFinite(number) ? number : null; -} - -function parseDate(value) { - if (!value) return null; - const clean = String(value).trim(); - const isoMatch = clean.match(/^(\d{4})-(\d{2})-(\d{2})/); - if (isoMatch) return new Date(`${isoMatch[1]}-${isoMatch[2]}-${isoMatch[3]}T12:00:00Z`); - const timestamp = Date.parse(clean); - return Number.isNaN(timestamp) ? null : new Date(timestamp); -} - -function isoDate(value) { - const parsed = value instanceof Date ? value : parseDate(value); - return parsed ? parsed.toISOString().slice(0, 10) : null; -} - -function formatDate(value) { - const parsed = value instanceof Date ? value : parseDate(value); - if (!parsed) return "Not supplied"; - return new Intl.DateTimeFormat("en-GB", { day: "numeric", month: "short", year: "numeric", timeZone: "UTC" }).format(parsed); -} -function dayDifference(current, previous) { - if (!current || !previous) return null; - return Math.round((current.getTime() - previous.getTime()) / 86400000); -} +// Engine bindings: schedule parsing and review live in ProjectLensEngine. +const parseXer = (text, fileName, options) => ProjectLensEngine.parseXer(text, fileName, options); +const parseEvidenceText = (...args) => ProjectLensEngine.parseEvidenceText(...args); +const compareSchedules = (...args) => ProjectLensEngine.compareSchedules(...args); +const buildReview = (...args) => ProjectLensEngine.buildReview(...args); +const assessCompleteness = (...args) => ProjectLensEngine.assessCompleteness(...args); +const pathCandidates = (...args) => ProjectLensEngine.pathCandidates(...args); +const reconcileDecisions = (...args) => ProjectLensEngine.reconcileDecisions(...args); +const compareBaseline = (...args) => ProjectLensEngine.compareBaseline(...args); +const numberValue = (...args) => ProjectLensEngine.numberValue(...args); +const parseDate = (...args) => ProjectLensEngine.parseDate(...args); +const formatDate = (...args) => ProjectLensEngine.formatDate(...args); +const dayDifference = (...args) => ProjectLensEngine.dayDifference(...args); +const isoDate = (...args) => ProjectLensEngine.isoDate(...args); function signed(value, suffix = "") { if (value === null || value === undefined) return "Not comparable"; @@ -67,147 +52,6 @@ function humanFileSize(bytes) { return `${(bytes / (1024 * 1024)).toFixed(1)} MB`; } -function nonEmptyLines(text) { - return String(text || "").split(/\r?\n/).map(line => line.trim()).filter(Boolean); -} - -function parseEvidenceText(text, kind) { - const lines = nonEmptyLines(text); - const header = (lines[0] || "").toLowerCase(); - const body = lines.slice(1); - const activityCodes = [...new Set((String(text).match(/\b[A-Z]{1,8}-\d{2,6}\b/g) || []))]; - const decisionLines = /status|decision_id|activity_code/.test(header) ? body : lines; - const decisions = kind === "decision" ? decisionLines.filter(line => /\b(approved|rejected|deferred|authorised|authorized|decision|change)\b/i.test(line)).map(line => { - const status = /\bapproved|authorised|authorized\b/i.test(line) ? "Approved" : /\brejected\b/i.test(line) ? "Rejected" : /\bdeferred\b/i.test(line) ? "Deferred" : "Recorded"; - const codes = [...new Set(line.match(/\b[A-Z]{1,8}-\d{2,6}\b/g) || [])]; - return { status, codes, text: line }; - }) : []; - const riskRows = kind === "risk" ? Math.max(0, body.length || (header ? lines.length : 0)) : 0; - return { lines, header, activityCodes, decisions, riskRows, characterCount: String(text || "").length }; -} - -function parseXer(text, fileName = "schedule.xer") { - if (!text || !text.trim()) throw new Error(`${fileName} is empty.`); - const tables = {}; - let tableName = null; - let fields = []; - const lines = text.replace(/^\uFEFF/, "").replace(/\r\n?/g, "\n").split("\n"); - - for (const line of lines) { - if (!line) continue; - const cells = line.split("\t"); - const marker = cells[0].trim(); - if (marker === "%T") { - tableName = (cells[1] || "").trim().toUpperCase(); - if (tableName) tables[tableName] ||= []; - fields = []; - } else if (marker === "%F" && tableName) { - fields = cells.slice(1).map(field => field.trim()); - } else if (marker === "%R" && tableName && fields.length) { - const record = {}; - fields.forEach((field, index) => { record[field] = cells[index + 1] ?? ""; }); - tables[tableName].push(record); - } - } - - if (!tables.TASK?.length) throw new Error(`${fileName} does not contain a readable TASK table.`); - if (!tables.PROJECT?.length) throw new Error(`${fileName} does not contain a readable PROJECT table.`); - - const wbsById = new Map((tables.PROJWBS || []).map(row => [row.wbs_id, row])); - const projectRow = tables.PROJECT[0]; - const taskRows = tables.TASK.filter(row => !projectRow.proj_id || row.proj_id === projectRow.proj_id); - const tasks = taskRows.map(row => { - const duration = numberValue(row.target_drtn_hr_cnt ?? row.orig_drtn_hr_cnt); - const remaining = numberValue(row.remain_drtn_hr_cnt); - const start = parseDate(row.early_start_date || row.target_start_date || row.act_start_date); - const finish = parseDate(row.early_end_date || row.target_end_date || row.act_end_date); - const taskType = row.task_type || ""; - return { - id: row.task_id, - projectId: row.proj_id, - code: row.task_code || row.task_id, - name: row.task_name || row.task_code || row.task_id, - wbsId: row.wbs_id, - wbsName: wbsById.get(row.wbs_id)?.wbs_name || wbsById.get(row.wbs_id)?.wbs_short_name || "Unassigned WBS", - calendarId: row.clndr_id || null, - type: taskType, - status: row.status_code || "", - duration, - remaining, - float: numberValue(row.total_float_hr_cnt), - start, - finish, - actualStart: parseDate(row.act_start_date), - actualFinish: parseDate(row.act_end_date), - constraint: row.constraint_type || row.cstr_type || "", - constraintDate: parseDate(row.cstr_date || row.constraint_date), - raw: row, - isMilestone: /mile/i.test(taskType) || duration === 0, - }; - }); - const taskById = new Map(tasks.map(task => [task.id, task])); - const calendars = (tables.CALENDAR || []).map(row => ({ - id: row.clndr_id, - name: row.clndr_name || row.clndr_id || "Unnamed calendar", - type: row.clndr_type || "Unknown", - })); - const relations = (tables.TASKPRED || []).filter(row => taskById.has(row.task_id) || taskById.has(row.pred_task_id)).map(row => ({ - id: row.task_pred_id || `${row.pred_task_id}->${row.task_id}`, - taskId: row.task_id, - predecessorId: row.pred_task_id, - type: row.pred_type || "PR_FS", - lag: numberValue(row.lag_hr_cnt) || 0, - taskCode: taskById.get(row.task_id)?.code || row.task_id, - predecessorCode: taskById.get(row.pred_task_id)?.code || row.pred_task_id, - external: !taskById.has(row.task_id) || !taskById.has(row.pred_task_id), - })); - - return { - fileName, - tables, - tasks, - taskById, - relations, - calendars, - projectCount: tables.PROJECT.length, - project: { - id: projectRow.proj_id || "unknown-project", - name: projectRow.proj_short_name || projectRow.proj_name || "Unnamed P6 project", - dataDate: parseDate(projectRow.last_recalc_date || projectRow.data_date), - plannedStart: parseDate(projectRow.plan_start_date || projectRow.scd_start_date), - scheduledFinish: parseDate(projectRow.scd_end_date || projectRow.plan_end_date), - }, - tableCounts: Object.fromEntries(Object.entries(tables).map(([name, rows]) => [name, rows.length])), - evidenceObjects: { - riskRecords: ["RISK", "PROJRISK", "RISKTYPE"].reduce((sum, name) => sum + (tables[name]?.length || 0), 0), - financialPeriodRecords: ["FINPER", "FINPERIOD", "TASKFIN", "TRSRCFIN"].reduce((sum, name) => sum + (tables[name]?.length || 0), 0), - activityCodeAssignments: ["TASKACTV", "ACTVCODE", "ACTVTYPE"].reduce((sum, name) => sum + (tables[name]?.length || 0), 0), - resourceAssignments: (tables.TASKRSRC || []).length, - globalObjectRecords: ["UDFTYPE", "UDFVALUE", "RSRC", "ROLERATE", "CURRTYPE"].reduce((sum, name) => sum + (tables[name]?.length || 0), 0), - }, - }; -} - -function relationSignatures(schedule) { - const signatures = new Map(schedule.tasks.map(task => [task.code, []])); - schedule.relations.forEach(relation => { - if (!signatures.has(relation.taskCode)) signatures.set(relation.taskCode, []); - signatures.get(relation.taskCode).push(`${relation.predecessorCode}|${relation.type}|${relation.lag}`); - }); - signatures.forEach(values => values.sort()); - return signatures; -} - -function relationshipMaps(schedule) { - const predecessors = new Map(schedule.tasks.map(task => [task.id, []])); - const successors = new Map(schedule.tasks.map(task => [task.id, []])); - schedule.relations.filter(relation => !relation.external).forEach(relation => { - predecessors.get(relation.taskId)?.push(relation); - successors.get(relation.predecessorId)?.push(relation); - }); - return { predecessors, successors }; -} - function selectedRules() { return { maxDurationHours: Math.max(8, Number($("#maxDurationDays").value || 20) * 8), @@ -219,344 +63,6 @@ function selectedRules() { }; } -function isBusinessCritical(task) { - return /\b(contract|completion|handover|takeover|acceptance|ready|readiness|operational|benefit|commission|key date|sectional|possession)\b/i.test(`${task?.code || ""} ${task?.name || ""}`); -} - -function compareSchedules(previous, current, rules) { - const previousByCode = new Map(previous.tasks.map(task => [task.code, task])); - const currentByCode = new Map(current.tasks.map(task => [task.code, task])); - const previousRelations = relationSignatures(previous); - const currentRelations = relationSignatures(current); - const allCodes = [...new Set([...previousByCode.keys(), ...currentByCode.keys()])]; - const changes = []; - - for (const code of allCodes) { - const before = previousByCode.get(code) || null; - const after = currentByCode.get(code) || null; - const types = []; - const evidence = []; - let score = 0; - let finishDelta = null; - let floatDelta = null; - - if (!before || !after) { - const added = Boolean(after); - types.push(added ? "added" : "removed"); - evidence.push({ label: added ? "Current XER" : "Previous XER", value: `${added ? "Added" : "Removed"} activity ${code}` }); - score += 22; - if ((after || before)?.isMilestone) score += 20; - } else { - finishDelta = dayDifference(after.finish, before.finish); - const startDelta = dayDifference(after.start, before.start); - const durationDelta = after.duration !== null && before.duration !== null ? after.duration - before.duration : null; - floatDelta = after.float !== null && before.float !== null ? after.float - before.float : null; - const constraintChanged = `${before.constraint}|${isoDate(before.constraintDate)}` !== `${after.constraint}|${isoDate(after.constraintDate)}`; - const beforeLogic = (previousRelations.get(code) || []).join(";"); - const afterLogic = (currentRelations.get(code) || []).join(";"); - const logicChanged = beforeLogic !== afterLogic; - - if (finishDelta !== null && finishDelta !== 0) { - types.push("dates"); - score += Math.abs(finishDelta) >= rules.materialSlipDays ? Math.min(36, 8 + Math.abs(finishDelta)) : 3; - if (finishDelta > 0) score += 5; - evidence.push({ label: "Finish movement", value: `${formatDate(before.finish)} → ${formatDate(after.finish)} (${signed(finishDelta, "d")})` }); - } - if (startDelta !== null && startDelta !== 0) evidence.push({ label: "Start movement", value: `${formatDate(before.start)} → ${formatDate(after.start)} (${signed(startDelta, "d")})` }); - if (durationDelta !== null && Math.abs(durationDelta) >= 8) { - types.push("duration"); - score += Math.min(15, 5 + Math.abs(durationDelta) / 16); - evidence.push({ label: "Original duration", value: `${before.duration}h → ${after.duration}h (${signed(durationDelta, "h")})` }); - } - if (floatDelta !== null && floatDelta !== 0) { - types.push("float"); - if (floatDelta < 0) score += Math.min(24, 7 + Math.abs(floatDelta) / 8); - evidence.push({ label: "Total float", value: `${before.float}h → ${after.float}h (${signed(floatDelta, "h")})` }); - } - if (constraintChanged) { - types.push("constraint"); - score += 18; - evidence.push({ label: "Constraint", value: `${before.constraint || "None"} ${formatDate(before.constraintDate)} → ${after.constraint || "None"} ${formatDate(after.constraintDate)}` }); - } - if (logicChanged) { - types.push("logic"); - score += 16; - evidence.push({ label: "Predecessor logic", value: `${previousRelations.get(code)?.length || 0} → ${currentRelations.get(code)?.length || 0} relationships` }); - } - if (after.float !== null && after.float < rules.floatThresholdHours) score += 10; - if (after.isMilestone && types.length) score += 18; - } - - if (!types.length) continue; - const task = after || before; - const currentFloat = after?.float ?? before?.float ?? null; - const pathClass = currentFloat === null ? "Not supplied" : currentFloat <= 0 ? "Critical or negative float" : currentFloat <= rules.nearCriticalHours ? "Near-critical" : "Outside threshold"; - const businessCritical = isBusinessCritical(task); - if (pathClass === "Critical or negative float") score += 16; - else if (pathClass === "Near-critical") score += 8; - if (businessCritical) score += 16; - if (pathClass !== "Outside threshold") evidence.push({ label: "Path sensitivity", value: `${pathClass} · exported total float ${currentFloat === null ? "not supplied" : `${currentFloat}h`}` }); - if (businessCritical) evidence.push({ label: "Business milestone signal", value: "Name or code indicates completion, acceptance, readiness or commissioning significance" }); - changes.push({ - id: `${code}-${changes.length}`, - code, - name: task.name, - wbsName: task.wbsName, - isMilestone: task.isMilestone, - types: [...new Set(types)], - finishDelta, - floatDelta, - currentFloat, - pathClass, - businessCritical, - score: Math.min(100, Math.round(score)), - severity: score >= 50 ? "high" : score >= 27 ? "medium" : "low", - before, - after, - evidence, - summary: evidence[0]?.value || `${types.join(", ")} change`, - }); - } - return changes.sort((a, b) => b.score - a.score || a.code.localeCompare(b.code)); -} - -function assessIntegrity(schedule, rules) { - const { predecessors, successors } = relationshipMaps(schedule); - const activeTasks = schedule.tasks.filter(task => !/complete/i.test(task.status)); - const missingPredecessors = activeTasks.filter(task => !task.isMilestone && (predecessors.get(task.id)?.length || 0) === 0); - const missingSuccessors = activeTasks.filter(task => !task.isMilestone && (successors.get(task.id)?.length || 0) === 0); - const longActivities = activeTasks.filter(task => task.duration !== null && task.duration > rules.maxDurationHours); - const negativeFloat = activeTasks.filter(task => task.float !== null && task.float < rules.floatThresholdHours); - const constrained = activeTasks.filter(task => task.constraint); - const positiveLag = schedule.relations.filter(relation => relation.lag > 0); - const external = schedule.relations.filter(relation => relation.external); - const issue = (type, label, items, detail, severity = "warn") => ({ type, label, count: items.length, examples: items.slice(0, 4).map(item => item.code || item.taskCode || item.id), detail, severity }); - return [ - issue("missing-predecessor", "Activities without predecessors", missingPredecessors, "Active non-milestone activities should normally be connected to the logic network."), - issue("missing-successor", "Activities without successors", missingSuccessors, "Open-ended work can weaken the reliability of downstream dates."), - issue("long-duration", "Long activities", longActivities, `Original duration exceeds ${rules.maxDurationHours / 8} eight-hour equivalent days.`), - issue("negative-float", "Float below threshold", negativeFloat, `Total float is below ${rules.floatThresholdHours} hours.`, "high"), - issue("constraints", "Dated constraints", constrained, "Constraints require a documented basis because they can influence float and driving paths."), - issue("positive-lag", "Positive relationship lag", rules.allowPositiveLag ? [] : positiveLag, "Positive lag is disabled by the selected acceptance rules."), - issue("external-logic", "External or unresolved relationships", external, "One side of the relationship is not present in this XER submission."), - ].filter(item => item.count > 0); -} - -function assessObjectDrift(previous, current) { - const previousCalendars = new Map(previous.calendars.map(item => [item.id, item.name])); - const currentCalendars = new Map(current.calendars.map(item => [item.id, item.name])); - const calendarDefinitions = [...new Set([...previousCalendars.keys(), ...currentCalendars.keys()])].filter(id => previousCalendars.get(id) !== currentCalendars.get(id)); - const previousTasks = new Map(previous.tasks.map(task => [task.code, task])); - const calendarAssignments = current.tasks.filter(task => previousTasks.has(task.code) && previousTasks.get(task.code).calendarId !== task.calendarId); - const objectCountChanges = [ - ["Activity-code assignments", previous.evidenceObjects.activityCodeAssignments, current.evidenceObjects.activityCodeAssignments], - ["Financial-period records", previous.evidenceObjects.financialPeriodRecords, current.evidenceObjects.financialPeriodRecords], - ["Global-object records", previous.evidenceObjects.globalObjectRecords, current.evidenceObjects.globalObjectRecords], - ].filter(([, before, after]) => before !== after); - const findings = []; - if (calendarDefinitions.length) findings.push({ type: "calendar-definition", label: "Changed calendar definitions", count: calendarDefinitions.length, examples: calendarDefinitions.slice(0, 4), detail: "Calendar IDs or names differ between submissions. Working-time definitions require review in P6.", severity: "high" }); - if (calendarAssignments.length) findings.push({ type: "calendar-assignment", label: "Changed activity calendars", count: calendarAssignments.length, examples: calendarAssignments.slice(0, 4).map(task => task.code), detail: "Activity calendar assignments changed and may affect dates, float and financial-period interpretation.", severity: "high" }); - if (objectCountChanges.length) findings.push({ type: "global-object-drift", label: "Code or global-object count changes", count: objectCountChanges.length, examples: objectCountChanges.map(([label]) => label), detail: objectCountChanges.map(([label, before, after]) => `${label}: ${before} → ${after}`).join("; "), severity: "warn" }); - if (current.projectCount > 1) findings.push({ type: "multiple-projects", label: "Multiple projects in current XER", count: current.projectCount, examples: [], detail: "The XER contains multiple projects. This browser review currently uses the first PROJECT record while preserving external relationships.", severity: "high" }); - return findings; -} - -function assessCompleteness(previous, current, evidence, narrative, baseline) { - const embeddedRiskCount = current.evidenceObjects.riskRecords; - const suppliedRiskCount = evidence.risk?.riskRows || 0; - const entries = [ - { key: "activities", label: "Activities", present: current.tasks.length > 0, status: current.tasks.length.toLocaleString(), detail: "Readable current TASK records" }, - { key: "relationships", label: "Relationships", present: current.relations.length > 0, status: current.relations.length.toLocaleString(), detail: "Readable current TASKPRED records" }, - { key: "calendars", label: "Calendars", present: current.calendars.length > 0, status: current.calendars.length ? current.calendars.length.toLocaleString() : "Missing", detail: current.calendars.length ? `${new Set(current.tasks.map(task => task.calendarId).filter(Boolean)).size} calendars assigned to activities` : "Calendar assumptions cannot be checked" }, - { key: "baseline", label: "Separate baseline", present: Boolean(baseline), status: baseline ? "Supplied" : "Missing", detail: baseline ? `${baseline.tasks.length.toLocaleString()} baseline activities available` : "XER does not reliably export baselines; current dates cannot be tested against commitment" }, - { key: "risk", label: "Risk evidence", present: embeddedRiskCount + suppliedRiskCount > 0, status: embeddedRiskCount + suppliedRiskCount > 0 ? `${embeddedRiskCount + suppliedRiskCount} records` : "Missing", detail: embeddedRiskCount ? "Risk-like records found in the XER" : suppliedRiskCount ? "Separate risk register supplied" : "Schedule movement cannot be reconciled to risk ownership" }, - { key: "basis", label: "Schedule basis", present: Boolean(evidence.basis?.characterCount), status: evidence.basis?.characterCount ? "Supplied" : "Missing", detail: evidence.basis?.characterCount ? `${evidence.basis.characterCount.toLocaleString()} characters of assumptions and basis` : "Calendar, productivity and sequencing assumptions are not evidenced" }, - { key: "narrative", label: "Update narrative", present: Boolean(narrative.trim()), status: narrative.trim() ? "Supplied" : "Missing", detail: narrative.trim() ? `${narrative.trim().length.toLocaleString()} characters available for claim testing` : "Contradiction testing is limited" }, - { key: "decisions", label: "Decision log", present: Boolean(evidence.decision?.decisions.length), status: evidence.decision?.decisions.length ? `${evidence.decision.decisions.length} decisions` : "Missing", detail: evidence.decision?.decisions.length ? `${evidence.decision.activityCodes.length} referenced activity codes` : "Material changes cannot be linked to an approval record" }, - { key: "float-contingency", label: "Float and contingency basis", present: Boolean(evidence.basis?.lines.join(" ").match(/\bfloat\b/i) && evidence.basis?.lines.join(" ").match(/\bcontingency\b/i)), status: evidence.basis?.lines.join(" ").match(/\bfloat\b/i) && evidence.basis?.lines.join(" ").match(/\bcontingency\b/i) ? "Addressed" : "Unclear", detail: "The schedule basis should state float ownership and where schedule contingency is held" }, - { key: "financial-periods", label: "Financial periods", present: current.evidenceObjects.financialPeriodRecords > 0, status: current.evidenceObjects.financialPeriodRecords ? `${current.evidenceObjects.financialPeriodRecords} records` : "Not present", detail: current.evidenceObjects.financialPeriodRecords ? "Financial-period records are present but still require calendar compatibility" : "Period performance cannot be assured from this submission" }, - { key: "codes", label: "Codes and global objects", present: current.evidenceObjects.activityCodeAssignments + current.evidenceObjects.globalObjectRecords > 0, status: current.evidenceObjects.activityCodeAssignments + current.evidenceObjects.globalObjectRecords > 0 ? "Present" : "Not present", detail: `${current.evidenceObjects.activityCodeAssignments} code assignments and ${current.evidenceObjects.globalObjectRecords} global-object records` }, - ]; - const presentCount = entries.filter(item => item.present).length; - const coverageLabel = presentCount >= 9 ? "Strong evidence set" : presentCount >= 6 ? "Bounded evidence set" : "Limited evidence set"; - const missing = entries.filter(item => !item.present).map(item => item.label.toLowerCase()); - return { - entries, - presentCount, - totalCount: entries.length, - coverageLabel, - missing, - boundary: missing.length ? `Conclusions are bounded because ${missing.join(", ")} ${missing.length === 1 ? "is" : "are"} missing or not present.` : "All defined evidence classes are present. Their quality and contractual status still require human review.", - }; -} - -function assessFitness(previous, current, narrative, completeness) { - const tableCheck = (name, label, required = true) => { - const previousCount = previous.tableCounts[name] || 0; - const currentCount = current.tableCounts[name] || 0; - const good = previousCount > 0 && currentCount > 0; - return { label, status: good ? "Present" : required ? "Missing" : "Not supplied", tone: good ? "good" : required ? "warn" : "info", detail: `${previousCount.toLocaleString()} previous / ${currentCount.toLocaleString()} current records` }; - }; - const sequenceGood = previous.project.dataDate && current.project.dataDate && current.project.dataDate > previous.project.dataDate; - return [ - tableCheck("TASK", "Activity table"), - tableCheck("TASKPRED", "Relationship table"), - tableCheck("PROJWBS", "Work breakdown structure"), - tableCheck("CALENDAR", "Calendars", false), - { label: "Submission sequence", status: sequenceGood ? "Valid" : "Check dates", tone: sequenceGood ? "good" : "warn", detail: `${formatDate(previous.project.dataDate)} → ${formatDate(current.project.dataDate)}` }, - { label: "Evidence coverage", status: `${completeness.presentCount}/${completeness.totalCount}`, tone: completeness.presentCount >= 9 ? "good" : "warn", detail: completeness.coverageLabel }, - { label: "Narrative", status: narrative.trim() ? "Supplied" : "Missing", tone: narrative.trim() ? "good" : "warn", detail: narrative.trim() ? `${narrative.trim().length.toLocaleString()} characters available for claim testing` : "Contradiction testing is limited without the update narrative." }, - ]; -} - -function pathCandidates(schedule, rules) { - const { predecessors, successors } = relationshipMaps(schedule); - return schedule.tasks - .filter(task => !/complete/i.test(task.status) && task.float !== null && task.float <= rules.nearCriticalHours) - .map(task => ({ - code: task.code, - name: task.name, - float: task.float, - classification: task.float <= 0 ? "Critical or negative float" : "Near-critical", - predecessors: predecessors.get(task.id)?.length || 0, - successors: successors.get(task.id)?.length || 0, - finish: isoDate(task.finish), - isMilestone: task.isMilestone, - businessCritical: isBusinessCritical(task), - })) - .sort((a, b) => a.float - b.float || Number(b.isMilestone) - Number(a.isMilestone) || a.code.localeCompare(b.code)); -} - -function reconcileDecisions(materialChanges, decisionEvidence) { - const decisions = decisionEvidence?.decisions || []; - return materialChanges.map(change => { - const matches = decisions.filter(decision => decision.codes.includes(change.code)); - return { - changeId: change.id, - code: change.code, - name: change.name, - linked: matches.length > 0, - decisions: matches, - status: matches.length ? matches.map(item => item.status).join(" / ") : "No linked decision", - }; - }); -} - -function compareBaseline(baseline, current) { - if (!baseline) return []; - const baselineByCode = new Map(baseline.tasks.map(task => [task.code, task])); - return current.tasks - .filter(task => task.isMilestone && task.finish && baselineByCode.get(task.code)?.finish) - .map(task => { - const committed = baselineByCode.get(task.code); - return { code: task.code, name: task.name, baseline: isoDate(committed.finish), current: isoDate(task.finish), movementDays: dayDifference(task.finish, committed.finish) }; - }) - .sort((a, b) => Math.abs(b.movementDays) - Math.abs(a.movementDays)); -} - -function selectPriorityChanges(materialChanges, limit) { - const selected = []; - const perWbs = new Map(); - const mustSee = materialChanges.filter(change => change.isMilestone || change.businessCritical); - for (const change of [...mustSee, ...materialChanges]) { - if (selected.some(item => item.id === change.id)) continue; - const count = perWbs.get(change.wbsName) || 0; - if (count >= 2 && !change.isMilestone && !change.businessCritical) continue; - selected.push(change); - perWbs.set(change.wbsName, count + 1); - if (selected.length >= limit) break; - } - return selected; -} - -function projectFinishMovement(previous, current) { - let before = previous.project.scheduledFinish; - let after = current.project.scheduledFinish; - let label = "Project scheduled finish"; - if (!before || !after) { - const currentMilestones = current.tasks.filter(task => task.isMilestone && task.finish).sort((a, b) => b.finish - a.finish); - const milestone = currentMilestones.find(item => previous.tasks.some(task => task.code === item.code && task.finish)); - if (milestone) { - const previousMilestone = previous.tasks.find(task => task.code === milestone.code); - before = previousMilestone.finish; - after = milestone.finish; - label = milestone.name; - } - } - return { days: dayDifference(after, before), before, after, label }; -} - -function narrativeAssessment(narrative, changes, finishMovement) { - const text = narrative.toLowerCase(); - const conflicts = []; - const relationshipChanges = changes.filter(change => change.types.includes("logic")); - const constraintChanges = changes.filter(change => change.types.includes("constraint")); - const floatErosion = changes.filter(change => change.evidence.some(item => item.label === "Total float" && /\(-/.test(item.value))); - const statedStable = /\b(unchanged|no material change|on track|as planned|remains stable|no impact)\b/.test(text); - const finishSlip = finishMovement.days || 0; - - if (!narrative.trim()) { - conflicts.push({ type: "Evidence gap", title: "No schedule narrative was supplied", detail: "The XER can show what changed, but not the planner's stated reason or approval basis." }); - return conflicts; - } - if (statedStable && finishSlip >= 7) conflicts.push({ type: "Direct contradiction", title: `The narrative presents stability while the scheduled finish moved ${finishSlip} days`, detail: `${finishMovement.label}: ${formatDate(finishMovement.before)} → ${formatDate(finishMovement.after)}.` }); - if (statedStable && floatErosion.some(change => change.score >= 30)) conflicts.push({ type: "Hidden pressure", title: "The narrative presents stability while material float was consumed", detail: `${floatErosion.length} changed activities show float erosion that may reduce schedule resilience.` }); - if (relationshipChanges.length && !/\b(logic|relationship|predecessor|successor|resequence|sequence)\b/.test(text)) conflicts.push({ type: "Unexplained change", title: `${relationshipChanges.length} logic changes are not addressed in the narrative`, detail: "Changed predecessor logic can alter the driving path even when headline dates appear stable." }); - if (constraintChanges.length && !/\bconstraint|mandatory|must finish|must start|fixed date\b/.test(text)) conflicts.push({ type: "Unexplained change", title: `${constraintChanges.length} constraint changes are not addressed in the narrative`, detail: "A dated constraint can influence float and the apparent critical path." }); - if (finishSlip >= 7 && !/\b(delay|slip|later|movement|forecast|completion|finish)\b/.test(text)) conflicts.push({ type: "Narrative omission", title: "Material finish movement is not described", detail: `${finishMovement.label} moved ${finishSlip} days later between submissions.` }); - return conflicts; -} - -function buildQuestions(changes, conflicts, integrity, completeness, decisionReconciliation, riskEvidence) { - const questions = []; - changes.filter(change => change.severity === "high").slice(0, 4).forEach(change => { - questions.push({ type: "Material change", question: `What approved change or delivery event explains the movement in ${change.code} ${change.name}?`, evidence: change.summary, changeId: change.id }); - }); - conflicts.slice(0, 3).forEach(conflict => questions.push({ type: conflict.type, question: `How should the submission narrative be corrected or evidenced to address: ${conflict.title.toLowerCase()}?`, evidence: conflict.detail })); - completeness.entries.filter(item => !item.present).slice(0, 3).forEach(item => questions.push({ type: "Evidence gap", question: `What evidence or limitation statement is required because ${item.label.toLowerCase()} is not present?`, evidence: item.detail })); - decisionReconciliation.filter(item => !item.linked).slice(0, 3).forEach(item => questions.push({ type: "Approval trace", question: `Which approved decision authorises the material change to ${item.code} ${item.name}?`, evidence: "No matching activity code was found in the supplied decision log.", changeId: item.changeId })); - if (riskEvidence) changes.filter(change => change.severity === "high" && !riskEvidence.activityCodes.includes(change.code)).slice(0, 2).forEach(change => questions.push({ type: "Risk trace", question: `Which owned risk explains the high-priority movement in ${change.code} ${change.name}?`, evidence: "No matching activity code was found in the supplied risk evidence.", changeId: change.id })); - integrity.filter(item => item.severity === "high" || item.count >= 3).slice(0, 3).forEach(item => questions.push({ type: "Schedule integrity", question: `What is the acceptance or remediation decision for ${item.count} ${item.label.toLowerCase()}?`, evidence: `${item.detail} Examples: ${item.examples.join(", ") || "none"}.` })); - return questions.slice(0, 10); -} - -function buildReview(previous, current, narrative, rules, evidence = {}, baseline = null) { - const changes = compareSchedules(previous, current, rules); - const integrity = [...assessIntegrity(current, rules), ...assessObjectDrift(previous, current)]; - const completeness = assessCompleteness(previous, current, evidence, narrative, baseline); - const fitness = assessFitness(previous, current, narrative, completeness); - const finishMovement = projectFinishMovement(previous, current); - const conflicts = narrativeAssessment(narrative, changes, finishMovement); - const materialChanges = changes.filter(change => change.score >= 27 || change.isMilestone || change.businessCritical || change.types.includes("constraint") || Math.abs(change.finishDelta || 0) >= rules.materialSlipDays); - materialChanges.forEach(change => { change.riskLinked = Boolean(evidence.risk?.activityCodes.includes(change.code)); }); - const priorityChanges = selectPriorityChanges(materialChanges, rules.executiveChangeLimit); - const paths = pathCandidates(current, rules); - const decisionReconciliation = reconcileDecisions(materialChanges, evidence.decision); - const baselineMovements = compareBaseline(baseline, current); - const questions = buildQuestions(priorityChanges, conflicts, integrity, completeness, decisionReconciliation, evidence.risk); - return { - generatedAt: new Date().toISOString(), - previous, - current, - narrative, - rules, - evidence, - baseline, - changes, - materialChanges, - priorityChanges, - integrity, - fitness, - completeness, - paths, - decisionReconciliation, - baselineMovements, - finishMovement, - conflicts, - questions, - }; -} - function updateFileCard(kind) { const file = reviewState.files[kind]; const capital = kind[0].toUpperCase() + kind.slice(1); @@ -572,15 +78,50 @@ function updateFileCard(kind) { async function loadFile(kind, file) { if (!file) return; - if (!/\.xer$/i.test(file.name)) { - showToast("Choose a Primavera P6 .xer file."); + if (/\.mpp$/i.test(file.name)) { + showToast("Export this schedule from MS Project as XML (File > Save As > XML) and load that"); + return; + } + if (!/\.(xer|xml)$/i.test(file.name)) { + showToast("Choose a Primavera P6 .xer/.xml or MS Project XML file."); return; } - const text = await file.text(); - reviewState.files[kind] = { name: file.name, size: file.size, text }; + const bytes = new Uint8Array(await file.arrayBuffer()); + let text; + let encoding = "utf-8"; + if (/\.xml$/i.test(file.name)) { + text = new TextDecoder("utf-8").decode(bytes); + } else { + const decoded = ProjectLensEngine.decodeXerBytes(bytes); + text = decoded.text; + encoding = decoded.encoding; + } + reviewState.files[kind] = { name: file.name, size: file.size, text, encoding, projectId: null }; updateFileCard(kind); } +function parseReviewFile(file) { + const projects = ProjectLensEngine.listProjects(file.text); + let projectId = file.projectId; + if (projects.length > 1 && !projectId) { + const listing = projects.map((p, i) => `${i + 1}. ${p.shortName} (${p.projId}, ${p.activityCount} activities)`).join("\n"); + const choice = window.prompt(`This file contains ${projects.length} projects. Enter the number to use:\n\n${listing}`, "1"); + if (!choice) throw new Error("Choose a project in the multi-project export before comparing."); + const index = Number(choice) - 1; + if (!projects[index]) throw new Error("That project number is not in the list."); + projectId = projects[index].projId; + file.projectId = projectId; + } + if (/\.xml$/i.test(file.name)) { + const xml = file.text; + if (/ setTimeout(resolve, 260)); } - const previous = parseXer(reviewState.files.previous.text, reviewState.files.previous.name); - const current = parseXer(reviewState.files.current.text, reviewState.files.current.name); - const baseline = reviewState.files.baseline ? parseXer(reviewState.files.baseline.text, reviewState.files.baseline.name) : null; + const previous = parseReviewFile(reviewState.files.previous); + const current = parseReviewFile(reviewState.files.current); + const baseline = reviewState.files.baseline ? parseReviewFile(reviewState.files.baseline) : null; const evidence = { risk: reviewState.files.risk ? parseEvidenceText(reviewState.files.risk.text, "risk") : null, basis: reviewState.files.basis ? parseEvidenceText(reviewState.files.basis.text, "basis") : null, @@ -933,7 +474,12 @@ function bindEvents() { $("#runReview").addEventListener("click", runReview); $("#narrativeFile").addEventListener("change", async event => { const file = event.target.files[0]; - if (file) $("#narrativeText").value = await file.text(); + if (!file) return; + try { + $("#narrativeText").value = await ProjectLensNarrative.readNarrativeFile(file); + } catch (error) { + showToast(error.message || "The narrative file could not be read."); + } }); $$('[data-mode-switch]').forEach(button => button.addEventListener("click", () => { document.body.dataset.mode = button.dataset.modeSwitch; diff --git a/examples/monthly/northstar-current.xer b/examples/monthly/northstar-current.xer new file mode 100644 index 0000000..08fab4b --- /dev/null +++ b/examples/monthly/northstar-current.xer @@ -0,0 +1,66 @@ +ERMHDR 8.4 2026-02-28 ProjectLens synthetic evidence Primavera PM Project Management USD +%T PROJECT +%F proj_id proj_short_name plan_start_date scd_end_date last_recalc_date +%R 1000 NORTHSTAR GRID CONNECTION 2026-01-05 00:00 2028-02-26 00:00 2026-02-28 00:00 +%T CALENDAR +%F clndr_id clndr_name clndr_type +%R 10 Northstar 5 Day Week CA_Project +%T PROJWBS +%F wbs_id proj_id parent_wbs_id wbs_short_name wbs_name +%R 100 1000 NS Northstar Grid Connection +%R 110 1000 100 DES Design and Consents +%R 120 1000 100 PROC Long Lead Procurement +%R 130 1000 100 BUILD Construction +%R 140 1000 100 COMM Testing and Commissioning +%R 150 1000 100 ENAB Enabling Works +%T TASK +%F task_id proj_id wbs_id clndr_id task_code task_name task_type status_code target_drtn_hr_cnt remain_drtn_hr_cnt total_float_hr_cnt early_start_date early_end_date act_start_date act_end_date constraint_type cstr_date +%R 1100 1000 100 10 NS-000 Notice to proceed TT_StartMile TK_Complete 0 0 0 2026-01-05 00:00 2026-01-05 00:00 2026-01-05 00:00 2026-01-05 00:00 +%R 1101 1000 110 10 NS-100 Detailed design mobilisation TT_Task TK_Complete 160 0 128 2026-01-06 00:00 2026-02-09 00:00 2026-01-06 00:00 2026-02-09 00:00 +%R 1102 1000 110 10 NS-110 Primary substation detailed design TT_Task TK_Active 480 360 40 2026-02-10 00:00 2026-05-04 00:00 2026-02-10 00:00 +%R 1103 1000 110 10 NS-120 Planning consent determination TT_Task TK_NotStart 480 480 16 2026-05-05 00:00 2026-07-27 00:00 CS_MEO 2026-10-30 00:00 +%R 1200 1000 120 10 NS-200 Long lead procurement release TT_Task TK_NotStart 240 240 8 2026-07-28 00:00 2026-09-07 00:00 +%R 1105 1000 120 10 NS-210 Switchgear manufacture and FAT TT_Task TK_NotStart 1280 1280 -32 2026-09-08 00:00 2027-04-19 00:00 +%R 1106 1000 130 10 NS-300 Substation civils and foundations TT_Task TK_NotStart 1040 1040 -40 2026-09-15 00:00 2027-03-15 00:00 +%R 1107 1000 130 10 NS-400 Primary plant installation TT_Task TK_NotStart 960 960 -48 2027-04-20 00:00 2027-10-05 00:00 +%R 1108 1000 140 10 NS-500 Protection testing TT_Task TK_NotStart 520 520 -56 2027-10-06 00:00 2028-01-04 00:00 +%R 1109 1000 140 10 NS-600 System commissioning TT_Task TK_NotStart 400 400 -72 2028-01-05 00:00 2028-03-14 00:00 CS_MEO 2028-02-26 00:00 +%R 1110 1000 140 10 NS-900 Ready for service TT_FinMile TK_NotStart 0 0 -72 2028-02-26 00:00 2028-02-26 00:00 CS_MEO 2028-02-26 00:00 +%R 1300 1000 150 10 NS-701 Temporary access design TT_Task TK_NotStart 80 80 320 2026-02-04 00:00 2026-02-15 00:00 +%R 1301 1000 150 10 NS-702 Temporary access permits TT_Task TK_NotStart 80 80 312 2026-02-18 00:00 2026-03-01 00:00 +%R 1302 1000 150 10 NS-703 Site compound layout TT_Task TK_NotStart 80 80 304 2026-03-04 00:00 2026-03-15 00:00 +%R 1303 1000 150 10 NS-704 Welfare procurement TT_Task TK_NotStart 80 80 296 2026-03-18 00:00 2026-03-29 00:00 +%R 1304 1000 150 10 NS-705 Fencing design TT_Task TK_NotStart 80 80 288 2026-04-01 00:00 2026-04-12 00:00 +%R 1305 1000 150 10 NS-706 Security review TT_Task TK_NotStart 80 80 280 2026-04-15 00:00 2026-04-26 00:00 +%R 1306 1000 150 10 NS-707 Survey control setup TT_Task TK_NotStart 80 80 272 2026-04-29 00:00 2026-05-10 00:00 +%R 1307 1000 150 10 NS-708 Temporary power design TT_Task TK_NotStart 80 80 264 2026-05-13 00:00 2026-05-24 00:00 +%R 1308 1000 150 10 NS-709 Temporary water design TT_Task TK_NotStart 80 80 256 2026-05-27 00:00 2026-06-07 00:00 +%R 1309 1000 150 10 NS-710 Compound installation TT_Task TK_NotStart 80 80 248 2026-06-10 00:00 2026-06-21 00:00 +%R 1310 1000 150 10 NS-711 Access route installation TT_Task TK_NotStart 80 80 240 2026-06-24 00:00 2026-07-05 00:00 +%R 1311 1000 150 10 NS-712 Enabling works inspection TT_Task TK_NotStart 80 80 232 2026-07-08 00:00 2026-07-19 00:00 +%T TASKPRED +%F task_pred_id task_id pred_task_id pred_type lag_hr_cnt +%R 1 1101 1100 PR_FS 0 +%R 2 1102 1101 PR_FS 0 +%R 3 1103 1102 PR_FS 0 +%R 11 1200 1103 PR_FS 0 +%R 12 1105 1200 PR_FS 0 +%R 13 1106 1200 PR_FS 40 +%R 6 1107 1105 PR_FS 0 +%R 7 1107 1106 PR_FS 0 +%R 8 1108 1107 PR_FS 0 +%R 9 1109 1108 PR_FS 0 +%R 10 1110 1109 PR_FS 0 +%R 20 1300 1100 PR_FS 0 +%R 21 1301 1300 PR_FS 0 +%R 22 1302 1301 PR_FS 0 +%R 23 1303 1302 PR_FS 0 +%R 24 1304 1303 PR_FS 0 +%R 25 1305 1304 PR_FS 0 +%R 26 1306 1305 PR_FS 0 +%R 27 1307 1306 PR_FS 0 +%R 28 1308 1307 PR_FS 0 +%R 29 1309 1308 PR_FS 0 +%R 30 1310 1309 PR_FS 0 +%R 31 1311 1310 PR_FS 0 +%E diff --git a/examples/monthly/northstar-narrative.txt b/examples/monthly/northstar-narrative.txt new file mode 100644 index 0000000..9db704e --- /dev/null +++ b/examples/monthly/northstar-narrative.txt @@ -0,0 +1,22 @@ +Northstar Grid Connection — Period Progress Report +Period: 01 Feb 2026 – 28 Feb 2026 +Data date: 28 Feb 2026 +Prepared for: Change Authority / Project Board +Author: PMO (on behalf of Project Director) + +1. Executive status +Amber. Northstar Grid Connection remains on track and the key completion date is unchanged. The team remains confident that the current plan supports the agreed ready-for-service commitment. + +2. Progress this period +Detailed design progressed as planned during February. Protection and systems integration planning continued against the accepted control schedule. Long-lead procurement progressed under the approved CR-017 release. + +3. Changes and decisions this period +- CR-014 (12 Feb): approved additional design development duration (Project Director). +- CR-017 (18 Feb): approved separate long-lead procurement release activity (Commercial Director). +- CR-018 (24 Feb): deferred decision on later civils mobilisation pending consent evidence (SRO). + +4. Interfaces and mitigations +The programme continues to manage planning and procurement interfaces through the established governance process. Interface pressure is being worked in the weekly integration forum. No material change to the delivery sequence is reported this period. + +5. Board recommendation +Note period progress. No further board decision is requested. Ready-for-service remains achievable under the current plan. diff --git a/examples/monthly/northstar-previous.xer b/examples/monthly/northstar-previous.xer new file mode 100644 index 0000000..3bcdabd --- /dev/null +++ b/examples/monthly/northstar-previous.xer @@ -0,0 +1,64 @@ +ERMHDR 8.4 2026-01-31 ProjectLens synthetic evidence Primavera PM Project Management USD +%T PROJECT +%F proj_id proj_short_name plan_start_date scd_end_date last_recalc_date +%R 1000 NORTHSTAR GRID CONNECTION 2026-01-05 00:00 2027-12-15 00:00 2026-01-31 00:00 +%T CALENDAR +%F clndr_id clndr_name clndr_type +%R 10 Northstar 5 Day Week CA_Project +%T PROJWBS +%F wbs_id proj_id parent_wbs_id wbs_short_name wbs_name +%R 100 1000 NS Northstar Grid Connection +%R 110 1000 100 DES Design and Consents +%R 120 1000 100 PROC Long Lead Procurement +%R 130 1000 100 BUILD Construction +%R 140 1000 100 COMM Testing and Commissioning +%R 150 1000 100 ENAB Enabling Works +%T TASK +%F task_id proj_id wbs_id clndr_id task_code task_name task_type status_code target_drtn_hr_cnt remain_drtn_hr_cnt total_float_hr_cnt early_start_date early_end_date act_start_date act_end_date constraint_type cstr_date +%R 1100 1000 100 10 NS-000 Notice to proceed TT_StartMile TK_Complete 0 0 0 2026-01-05 00:00 2026-01-05 00:00 2026-01-05 00:00 2026-01-05 00:00 +%R 1101 1000 110 10 NS-100 Detailed design mobilisation TT_Task TK_Active 160 120 160 2026-01-06 00:00 2026-02-02 00:00 2026-01-06 00:00 +%R 1102 1000 110 10 NS-110 Primary substation detailed design TT_Task TK_NotStart 320 320 120 2026-02-03 00:00 2026-03-30 00:00 +%R 1103 1000 110 10 NS-120 Planning consent determination TT_Task TK_NotStart 480 480 104 2026-03-31 00:00 2026-06-22 00:00 +%R 1105 1000 120 10 NS-210 Switchgear manufacture and FAT TT_Task TK_NotStart 1120 1120 88 2026-06-23 00:00 2027-01-04 00:00 +%R 1106 1000 130 10 NS-300 Substation civils and foundations TT_Task TK_NotStart 960 960 80 2026-06-23 00:00 2026-12-07 00:00 +%R 1107 1000 130 10 NS-400 Primary plant installation TT_Task TK_NotStart 960 960 56 2027-01-05 00:00 2027-06-21 00:00 +%R 1108 1000 140 10 NS-500 Protection testing TT_Task TK_NotStart 480 480 40 2027-06-22 00:00 2027-09-13 00:00 +%R 1109 1000 140 10 NS-600 System commissioning TT_Task TK_NotStart 400 400 24 2027-09-14 00:00 2027-11-22 00:00 +%R 1110 1000 140 10 NS-900 Ready for service TT_FinMile TK_NotStart 0 0 24 2027-12-15 00:00 2027-12-15 00:00 +%R 1300 1000 150 10 NS-701 Temporary access design TT_Task TK_NotStart 80 80 320 2026-02-02 00:00 2026-02-13 00:00 +%R 1301 1000 150 10 NS-702 Temporary access permits TT_Task TK_NotStart 80 80 312 2026-02-16 00:00 2026-02-27 00:00 +%R 1302 1000 150 10 NS-703 Site compound layout TT_Task TK_NotStart 80 80 304 2026-03-02 00:00 2026-03-13 00:00 +%R 1303 1000 150 10 NS-704 Welfare procurement TT_Task TK_NotStart 80 80 296 2026-03-16 00:00 2026-03-27 00:00 +%R 1304 1000 150 10 NS-705 Fencing design TT_Task TK_NotStart 80 80 288 2026-03-30 00:00 2026-04-10 00:00 +%R 1305 1000 150 10 NS-706 Security review TT_Task TK_NotStart 80 80 280 2026-04-13 00:00 2026-04-24 00:00 +%R 1306 1000 150 10 NS-707 Survey control setup TT_Task TK_NotStart 80 80 272 2026-04-27 00:00 2026-05-08 00:00 +%R 1307 1000 150 10 NS-708 Temporary power design TT_Task TK_NotStart 80 80 264 2026-05-11 00:00 2026-05-22 00:00 +%R 1308 1000 150 10 NS-709 Temporary water design TT_Task TK_NotStart 80 80 256 2026-05-25 00:00 2026-06-05 00:00 +%R 1309 1000 150 10 NS-710 Compound installation TT_Task TK_NotStart 80 80 248 2026-06-08 00:00 2026-06-19 00:00 +%R 1310 1000 150 10 NS-711 Access route installation TT_Task TK_NotStart 80 80 240 2026-06-22 00:00 2026-07-03 00:00 +%R 1311 1000 150 10 NS-712 Enabling works inspection TT_Task TK_NotStart 80 80 232 2026-07-06 00:00 2026-07-17 00:00 +%T TASKPRED +%F task_pred_id task_id pred_task_id pred_type lag_hr_cnt +%R 1 1101 1100 PR_FS 0 +%R 2 1102 1101 PR_FS 0 +%R 3 1103 1102 PR_FS 0 +%R 4 1105 1103 PR_FS 0 +%R 5 1106 1103 PR_FS 0 +%R 6 1107 1105 PR_FS 0 +%R 7 1107 1106 PR_FS 0 +%R 8 1108 1107 PR_FS 0 +%R 9 1109 1108 PR_FS 0 +%R 10 1110 1109 PR_FS 0 +%R 20 1300 1100 PR_FS 0 +%R 21 1301 1300 PR_FS 0 +%R 22 1302 1301 PR_FS 0 +%R 23 1303 1302 PR_FS 0 +%R 24 1304 1303 PR_FS 0 +%R 25 1305 1304 PR_FS 0 +%R 26 1306 1305 PR_FS 0 +%R 27 1307 1306 PR_FS 0 +%R 28 1308 1307 PR_FS 0 +%R 29 1309 1308 PR_FS 0 +%R 30 1310 1309 PR_FS 0 +%R 31 1311 1310 PR_FS 0 +%E diff --git a/package.json b/package.json new file mode 100644 index 0000000..c745389 --- /dev/null +++ b/package.json @@ -0,0 +1,14 @@ +{ + "name": "projectlens", + "private": true, + "version": "0.1.0", + "description": "Browser-local and CLI change assurance for project controls schedules", + "scripts": { + "test": "node --test \"tests/**/*.test.mjs\"", + "cli": "node bin/projectlens.mjs", + "bench": "node bench/real-cases/run.mjs" + }, + "engines": { + "node": ">=18" + } +} diff --git a/scripts/download-real-xer.sh b/scripts/download-real-xer.sh new file mode 100755 index 0000000..608b033 --- /dev/null +++ b/scripts/download-real-xer.sh @@ -0,0 +1,10 @@ +#!/usr/bin/env bash +# Optional download of public sample XERs used by the real-case suite. +# Skipped tests stay skipped until these files exist under research_notes. +set -euo pipefail +ROOT="$(cd "$(dirname "$0")/.." && pwd)" +DEST="${REAL_XER_DIR:-$ROOT/../research_notes/Real case tests/projectlens-inputs/real-xer}" +echo "Download destinations are documented in the research notes real-xer folders." +echo "Set REAL_XER_DIR and place licensed public samples under: $DEST" +echo "This script does not fetch automatically (licence terms vary by upstream)." +exit 0 diff --git a/tests/cli.test.mjs b/tests/cli.test.mjs new file mode 100644 index 0000000..d96f53d --- /dev/null +++ b/tests/cli.test.mjs @@ -0,0 +1,96 @@ +// CLI: compare, batch and input-error exit codes. +import assert from "node:assert/strict"; +import { spawnSync } from "node:child_process"; +import fs from "node:fs"; +import os from "node:os"; +import path from "node:path"; +import { fileURLToPath } from "node:url"; +import { describe, it } from "node:test"; + +const __dirname = path.dirname(fileURLToPath(import.meta.url)); +const REPO = path.resolve(__dirname, ".."); +const CLI = path.join(REPO, "bin/projectlens.mjs"); + +function run(args, opts = {}) { + return spawnSync(process.execPath, [CLI, ...args], { + encoding: "utf8", + cwd: REPO, + ...opts, + }); +} + +describe("projectlens CLI", () => { + it("compare on Northstar exits 1 with a 73-day contradiction in JSON", () => { + const result = run([ + "compare", + "--previous", "docs/demo/northstar-previous.xer", + "--current", "docs/demo/northstar-current.xer", + "--narrative", "docs/demo/northstar-narrative.txt", + "--format", "json", + ]); + assert.equal(result.status, 1, result.stderr || result.stdout); + const payload = JSON.parse(result.stdout); + assert.equal(payload.finishMovement, 73); + assert.ok(payload.contradiction); + }); + + it("batch on examples/monthly writes the history CSV header", () => { + const out = path.join(os.tmpdir(), `projectlens-batch-${Date.now()}.csv`); + const result = run([ + "batch", + "--dir", "examples/monthly", + "--format", "csv", + "--out", out, + ]); + assert.ok(result.status === 0 || result.status === 1, result.stderr || result.stdout); + const csv = fs.readFileSync(out, "utf8"); + assert.match( + csv.split(/\r?\n/)[0], + /^project,previous_date,current_date,finish_previous,finish_current,days_moved,narrative_claim,contradiction$/, + ); + fs.unlinkSync(out); + }); + + it("refuses .mpp with exit 3", () => { + const mpp = path.join(os.tmpdir(), `fake-${Date.now()}.mpp`); + fs.writeFileSync(mpp, "not a real mpp"); + const result = run([ + "compare", + "--previous", mpp, + "--current", "docs/demo/northstar-current.xer", + ]); + fs.unlinkSync(mpp); + assert.equal(result.status, 3, result.stderr || result.stdout); + assert.match(result.stderr || result.stdout, /Export this schedule from MS Project as XML/); + }); +}); + +describe("Round 4 plain findings", () => { + const args = ["compare", "--previous", "examples/monthly/northstar-previous.xer", + "--current", "examples/monthly/northstar-current.xer", + "--narrative", "examples/monthly/northstar-narrative.txt"]; + const sentence = "The update says 'remains on track'. The schedule's finish moved from 15 Dec 2027 to 26 Feb 2028 (73 days)."; + it("prints the shared contradiction sentence", () => { + const result = run([...args, "--format", "text"]); + assert.equal(result.status, 1); + assert.ok(result.stdout.includes(sentence), result.stdout); + }); + it("includes claim, contradiction and publishedDateCheck in JSON", () => { + const result = run([...args, "--format", "json"]); + const payload = JSON.parse(result.stdout); + assert.equal(payload.claim, sentence); + assert.equal(payload.contradiction, true); + assert.equal(payload.publishedDateCheck, null); + assert.equal(payload.claims.evidence.phrase, "remains on track"); + assert.equal(payload.claims.evidence.previousFinish, "2027-12-15"); + assert.equal(payload.claims.evidence.currentFinish, "2028-02-26"); + }); + for (const format of ["text", "md"]) { + it(`quotes the exact sentence and marks the matched phrase in ${format}`, () => { + const result = run([...args, "--format", format]); + assert.equal(result.status, 1); + assert.match(result.stdout, /Northstar Grid Connection \*\*remains on track\*\* and the key completion date is unchanged\./); + assert.ok(result.stdout.includes(sentence), result.stdout); + }); + } +}); diff --git a/tests/engine/claims.test.mjs b/tests/engine/claims.test.mjs new file mode 100644 index 0000000..800e0a5 --- /dev/null +++ b/tests/engine/claims.test.mjs @@ -0,0 +1,713 @@ +// Narrative claim and UK date detection for detectScheduleClaims. +import assert from "node:assert/strict"; +import { createRequire } from "node:module"; +import fs from "node:fs"; +import vm from "node:vm"; +import path from "node:path"; +import { fileURLToPath } from "node:url"; +import { describe, it } from "node:test"; + +const __dirname = path.dirname(fileURLToPath(import.meta.url)); +const REPO = path.resolve(__dirname, "../.."); +const RESEARCH = path.resolve(REPO, "../research_notes/Real case tests/projectlens-inputs"); +const require = createRequire(import.meta.url); +const engine = require(path.join(REPO, "docs/engine/projectlens-engine.js")); + +const pairs = JSON.parse(fs.readFileSync(path.join(RESEARCH, "gmpp_pairs.json"), "utf8")); + +describe("explained moves retain historical dates and capability scope", () => { + for (const predicate of ["was previously scheduled", "was originally expected"]) { + it(`keeps a finish that ${predicate} in the past`, () => { + const result = engine.detectScheduleClaims( + `The project ${predicate} to complete by 18 September 2028. Closure now follows the final audit.`, + { previousFinish: "2028-09-18", currentFinish: "2028-12-18" }, + ); + assert.equal(result.dates[0].role, "previous-finish"); + assert.equal(result.contradiction, null); + assert.equal(result.publishedDateCheck, null); + }); + } + + for (const capability of [ + "initial operating capability", "initial operational capability", + "full operating capability", "full operational capability", + ]) { + it(`keeps ${capability} separate from programme closure`, () => { + const result = engine.detectScheduleClaims( + `The programme remains on track to deliver its ${capability} in October 2028.`, + { previousFinish: "2032-04-30", currentFinish: "2030-04-30" }, + ); + assert.deepEqual(result.stable, []); + assert.equal(result.contradiction, null); + assert.equal(result.publishedDateCheck, null); + }); + } +}); + +function pair(nameRe, prevYear, year) { + const hit = pairs.find(p => nameRe.test(p.name) && p.prevYear === prevYear && p.year === year); + assert.ok(hit, `missing pair ${nameRe} ${prevYear}->${year}`); + return hit; +} + +describe("detectScheduleClaims", () => { + it("exports detectScheduleClaims and claim rules", () => { + assert.equal(typeof engine.detectScheduleClaims, "function"); + const rules = JSON.parse(fs.readFileSync(path.join(REPO, "docs/engine/claim-rules.json"), "utf8")); + assert.ok(rules.stablePhrases.includes("remained the same")); + assert.ok(rules.movePhrases.includes("correction of published position")); + }); + + it("Land ISTAR 2025→2026: date in narrative mismatches current finish", () => { + const p = pair(/ISTAR/i, 2025, 2026); + const result = engine.detectScheduleClaims(p.narrative, { + currentFinish: p.curEnd, + previousFinish: p.prevEnd, + }); + assert.equal(result.contradiction?.kind, "date-mismatch"); + }); + + it("E7 Wedgetail 2025→2026: contradiction while finish moved", () => { + const p = pair(/Wedgetail/i, 2025, 2026); + const result = engine.detectScheduleClaims(p.narrative, { + currentFinish: p.curEnd, + previousFinish: p.prevEnd, + }); + assert.ok(result.contradiction, "expected a contradiction"); + assert.ok(["says-unchanged", "date-mismatch"].includes(result.contradiction.kind)); + }); + + it("E7 Wedgetail 2021→2022: stated move suppresses contradiction", () => { + const p = pair(/Wedgetail/i, 2021, 2022); + const result = engine.detectScheduleClaims(p.narrative, { + currentFinish: p.curEnd, + previousFinish: p.prevEnd, + }); + assert.equal(result.contradiction, null); + }); + + it("does not treat 'not on track' as a stable claim", () => { + const result = engine.detectScheduleClaims("The programme is not on track for the original finish.", { + currentFinish: "2030-01-01", + previousFinish: "2027-01-01", + }); + assert.equal(result.stable.length, 0); + assert.equal(result.contradiction, null); + }); + + it("parses every Review Focus 1 UK date form to the right ISO date", () => { + const cases = [ + ["31/12/2027", "2027-12-31"], + ["31 December 2027", "2027-12-31"], + ["31 Dec 27", "2027-12-31"], + ["30 June 26", "2026-06-30"], + ["December 2027", "2027-12-31"], + ["2027-12-31", "2027-12-31"], + ["Q4 2027-28", "2028-03-31"], + ["25/26-Q4", "2026-03-31"], + ]; + for (const [raw, iso] of cases) { + const result = engine.detectScheduleClaims(`Finish is ${raw}.`, { + currentFinish: iso, + previousFinish: iso, + }); + assert.ok(result.dates.some(d => d.iso === iso && d.raw.includes(raw.split(" ")[0])), `failed for ${raw}: ${JSON.stringify(result.dates)}`); + const hit = result.dates.find(d => d.iso === iso); + assert.equal(hit.iso, iso, raw); + } + }); + + it("gives no contradiction when a stated move lands on the published finish", () => { + // Round 2 N3: a move only suppresses when it lands on currentFinish (within 14 days). + const candidates = pairs.filter(p => Math.abs(p.deltaDays) >= 7 && (p.explainsCorrection || (p.mentionsMove && !p.claimsSame))); + assert.ok(candidates.length > 0); + let checked = 0; + for (const p of candidates) { + const result = engine.detectScheduleClaims(p.narrative, { + currentFinish: p.curEnd, + previousFinish: p.prevEnd, + }); + const lands = result.movesStated.some(move => { + if (!move.to) return false; + const delta = engine.dayDifference( + engine.parseDate(move.to), + engine.parseDate(p.curEnd), + ); + return delta !== null && Math.abs(delta) <= 14; + }); + if (!lands) continue; + checked += 1; + assert.equal( + result.contradiction, + null, + `${p.name} ${p.prevYear}->${p.year}: ${JSON.stringify(result.contradiction)} :: ${p.narrative.slice(0, 120)}`, + ); + } + assert.ok(checked > 0, "expected at least one landing move case"); + }); + + // Round 2 N1: more "unchanged" wording and whitespace / NBSP normalisation. + it("flags 'has remained static' when the finish moved", () => { + const result = engine.detectScheduleClaims( + "The completion date has remained static since the last report.", + { currentFinish: "2028-01-01", previousFinish: "2027-06-15" }, + ); + assert.equal(result.contradiction?.kind, "says-unchanged"); + }); + + it("flags 'remains constant' when the named date mismatches", () => { + // Finish did not move: Round 3 D3 turns this into a published-date check, not a contradiction. + const result = engine.detectScheduleClaims( + "Delivery remains constant at 30/09/2028.", + { currentFinish: "2029-06-30", previousFinish: "2029-06-30" }, + ); + assert.equal(result.contradiction, null); + assert.equal(result.publishedDateCheck?.narrativeDate, "2028-09-30"); + }); + + it("accepts a true unchanged claim with matching date", () => { + const result = engine.detectScheduleClaims( + "The baseline end date remains 31/08/26 and has not changed.", + { currentFinish: "2026-08-31", previousFinish: "2026-08-31" }, + ); + assert.equal(result.contradiction, null); + }); + + it("parses a date that contains a non-breaking space", () => { + // U+00A0 sits between August and the year in real GMPP paste-outs. + const narrative = "Finish is 31 August\u00A02026."; + const result = engine.detectScheduleClaims(narrative, { + currentFinish: "2026-08-31", + previousFinish: "2026-08-31", + }); + assert.ok( + result.dates.some(d => d.iso === "2026-08-31"), + `expected 2026-08-31 in ${JSON.stringify(result.dates)}`, + ); + }); + + // Round 2 N2: reporting periods are not finish dates; quarter finishes are. + it("ignores financial-year reporting periods after 'compared to'", () => { + const result = engine.detectScheduleClaims( + "Compared to financial year 21/22-Q4, the end date remained 31/03/2027.", + { currentFinish: "2027-03-31", previousFinish: "2027-03-31" }, + ); + assert.equal(result.contradiction, null); + // Reporting FY labels may sit in dates with role reporting; only current-finish counts. + const finishDates = result.dates.filter(d => d.role === "current-finish"); + assert.deepEqual( + finishDates.map(d => d.iso), + ["2027-03-31"], + ); + assert.ok( + result.dates.every(d => d.role !== "current-finish" || d.iso === "2027-03-31"), + ); + }); + + it("treats an end-date FY quarter as a finish claim when current is inside it", () => { + // Plan wrote Q2 25/26 with 2026-06-15; under UK FY that quarter is Jul–Sep 2025. + // Q1 26/27 is Apr–Jun 2026, which is the range those dates actually test. + const sentence = "The current forecast end date is Q1 26/27 following re-planning."; + const inside = engine.detectScheduleClaims(sentence, { + currentFinish: "2026-06-15", + previousFinish: "2026-06-15", + }); + assert.equal(inside.contradiction, null); + assert.ok(inside.dates.some(d => d.precision === "quarter")); + + // No move + outside the quarter → publishedDateCheck (Round 3 D3). + const outside = engine.detectScheduleClaims(sentence, { + currentFinish: "2026-12-20", + previousFinish: "2026-12-20", + }); + assert.equal(outside.contradiction, null); + assert.ok(outside.publishedDateCheck); + + // Finish moved + outside the quarter → still a date-mismatch contradiction. + const movedOutside = engine.detectScheduleClaims(sentence, { + currentFinish: "2026-12-20", + previousFinish: "2026-06-15", + }); + assert.equal(movedOutside.contradiction?.kind, "date-mismatch"); + }); + + it("also accepts the plan's Q2 25/26 wording against a date inside that quarter", () => { + const sentence = "The current forecast end date is Q2 25/26 following re-planning."; + const inside = engine.detectScheduleClaims(sentence, { + currentFinish: "2025-08-15", + previousFinish: "2025-08-15", + }); + assert.equal(inside.contradiction, null); + + const outside = engine.detectScheduleClaims(sentence, { + currentFinish: "2026-12-20", + previousFinish: "2026-12-20", + }); + assert.equal(outside.contradiction, null); + assert.ok(outside.publishedDateCheck); + + const movedOutside = engine.detectScheduleClaims(sentence, { + currentFinish: "2026-12-20", + previousFinish: "2025-08-15", + }); + assert.equal(movedOutside.contradiction?.kind, "date-mismatch"); + }); + + // Round 2 N3: a stated move only explains the published date it lands on. + it("flags a stated move whose 'to' date misses the published finish", () => { + const sentence = "the end date changed from 01/04/2027 to 30/09/2027 due to supplier delays"; + const miss = engine.detectScheduleClaims(sentence, { + currentFinish: "2028-03-31", + previousFinish: "2027-04-01", + }); + assert.equal(miss.contradiction?.kind, "date-mismatch"); + assert.match( + miss.contradiction.detail, + /moved to 2027-09-30.*published end date is 2028-03-31/i, + ); + + const near = engine.detectScheduleClaims(sentence, { + currentFinish: "2027-10-05", + previousFinish: "2027-04-01", + }); + assert.equal(near.contradiction, null); + }); + + it("accepts a direction-only extension only when the finish moved later", () => { + const sentence = "the end date was extended following re-planning"; + const later = engine.detectScheduleClaims(sentence, { + currentFinish: "2028-01-01", + previousFinish: "2027-10-03", + }); + assert.equal(later.contradiction, null); + + const earlier = engine.detectScheduleClaims(sentence, { + currentFinish: "2027-07-05", + previousFinish: "2027-10-03", + }); + assert.equal(earlier.contradiction?.kind, "date-mismatch"); + }); + + // Round 3 D1: each date gets a role; only current-finish drives date-mismatch. + it("classifies the standard GMPP template dates and stays quiet when they match", () => { + const narrative = + "The scheduled baseline project end date at Q2 2021 (30th September 2020) is 31/12/22, " + + "has not changed since last year's Q2 1920 date of 31/12/22, due to supplier phasing."; + const result = engine.detectScheduleClaims(narrative, { + currentFinish: "2022-12-31", + previousFinish: "2022-12-31", + }); + assert.equal(result.contradiction, null); + const roles = result.dates.map(d => d.role); + assert.ok(roles.includes("reporting"), `roles=${JSON.stringify(roles)}`); + assert.ok(roles.includes("current-finish"), `roles=${JSON.stringify(roles)}`); + assert.ok(roles.includes("previous-finish"), `roles=${JSON.stringify(roles)}`); + }); + + it("uses only the current-finish date for date-mismatch on a lengthened-end sentence", () => { + const narrative = + "The scheduled baseline project end date at Q2 2021 (30th September 2020) is 30/06/25, " + + "has lengthened by 365 days since last year's Q2 1920 date of 30/06/24 due to scope."; + const match = engine.detectScheduleClaims(narrative, { + currentFinish: "2025-06-30", + previousFinish: "2024-06-30", + }); + assert.equal(match.contradiction, null); + + const miss = engine.detectScheduleClaims(narrative, { + currentFinish: "2026-03-31", + previousFinish: "2024-06-30", + }); + assert.equal(miss.contradiction?.kind, "date-mismatch"); + assert.match(miss.contradiction.detail, /30\/06\/25|2025-06-30/); + }); + + it("treats milestone dates as other and does not flag an on-track list", () => { + const result = engine.detectScheduleClaims( + "Milestones remain on track: Phase 1 go-live Apr 2021, Phase 2 Mar 2023.", + { currentFinish: "2025-12-31", previousFinish: "2025-12-31" }, + ); + assert.equal(result.contradiction, null); + const milestoneDates = result.dates.filter(d => + /apr\s*2021|mar\s*2023/i.test(d.raw), + ); + assert.equal(milestoneDates.length, 2); + assert.ok(milestoneDates.every(d => d.role === "other")); + }); + + it("ignores a review-month date when delivery is on track and the finish did not move", () => { + const result = engine.detectScheduleClaims( + "The March 2022 review confirmed delivery was on track.", + { currentFinish: "2027-06-30", previousFinish: "2027-06-30" }, + ); + assert.equal(result.contradiction, null); + }); + + // Round 3 D2: move / stable phrases only count when about the end date. + it("ignores a contract-start move when the programme end is unaffected", () => { + const narrative = + "The contract start date has moved back by four weeks. The overall programme end date is unaffected."; + const stable = engine.detectScheduleClaims(narrative, { + currentFinish: "2028-06-30", + previousFinish: "2028-06-30", + }); + assert.equal(stable.contradiction, null); + + const moved = engine.detectScheduleClaims(narrative, { + currentFinish: "2028-10-28", + previousFinish: "2028-06-30", + }); + assert.equal(moved.contradiction?.kind, "says-unchanged"); + }); + + it("accepts 'has lengthened by' when the finish moved by that amount", () => { + const result = engine.detectScheduleClaims( + "The end date has lengthened by 200 days.", + { currentFinish: "2027-07-19", previousFinish: "2026-12-31" }, + ); + assert.equal(result.contradiction, null); + assert.ok(result.movesStated.some(m => /lengthened by/i.test(m.phrase))); + }); + + // Round 3 D3: no-move + mismatched current-finish → check, not contradiction. + it("returns publishedDateCheck when the finish did not move but the narrative date differs", () => { + const result = engine.detectScheduleClaims( + "The end date has changed since last year and is now 31/03/2027.", + { currentFinish: "2026-03-31", previousFinish: "2026-03-31" }, + ); + assert.equal(result.contradiction, null); + assert.equal(result.publishedDateCheck?.narrativeDate, "2027-03-31"); + assert.equal(result.publishedDateCheck?.publishedDate, "2026-03-31"); + assert.match( + result.publishedDateCheck.detail, + /narrative gives the end date as .*published end date is/i, + ); + }); +}); + +// Round 4 narrative-only examples are synthetic regression inputs, not project records. +describe("Round 4 programme stability", () => { + for (const sentence of ["The programme remains on track.", "Compared to last year, the programme remains on track.", "The project delivery remains on schedule.", "Delivery is on schedule.", "The project is progressing to plan.", "The programme remains on course.", "The project is on target to complete."]) { + it(sentence, () => { + const result = engine.detectScheduleClaims(sentence, { previousFinish: "2026-06-30", currentFinish: "2026-12-27" }); + assert.equal(result.contradiction?.kind, "says-unchanged"); + }); + } + for (const sentence of ["Phase 2 remains on track; the programme end date has moved to 31/03/2027.", "The programme is not on track.", "The procurement is on schedule.", "The programme's Phase 2 remains on track.", "Milestones remain on track: Phase 1 March 2027, Phase 2 June 2027."]) { + it(sentence, () => assert.equal(engine.detectScheduleClaims(sentence, { previousFinish: "2026-06-30", currentFinish: "2027-03-31" }).contradiction, null)); + } + it("delivery on schedule without a move stays quiet", () => { + assert.equal(engine.detectScheduleClaims("Delivery is on schedule.", { previousFinish: "2026-06-30", currentFinish: "2026-06-30" }).contradiction, null); + }); +}); + +describe("Round 4 published-date checks", () => { + for (const sentence of [ + "The project is now expected to complete in March 2027.", + "Completion is now expected in March 2027.", + "The end date is Q4 2026/27.", + "The scheduled completion date is March 2027.", + "The project will complete by 31 March 2027.", + ]) { + it(sentence, () => { + const result = engine.detectScheduleClaims(sentence, { previousFinish: "2026-06-30", currentFinish: "2026-06-30" }); + assert.equal(result.contradiction, null); + assert.equal(result.publishedDateCheck?.narrativeDate, "2027-03-31"); + }); + } + it("matching end date needs no check", () => { + const result = engine.detectScheduleClaims("The end date remains 30/06/2026.", { previousFinish: "2026-06-30", currentFinish: "2026-06-30" }); + assert.equal(result.publishedDateCheck, null); + }); + it("does not inherit finish context across sentences", () => { + const result = engine.detectScheduleClaims("The end date is unchanged. The review is in March 2027.", { previousFinish: "2026-06-30", currentFinish: "2026-06-30" }); + assert.equal(result.publishedDateCheck, null); + }); +}); + +it("keeps end-date subject across a parenthesised reporting date", () => { + const result = engine.detectScheduleClaims( + "The scheduled baseline project end date at Q2 2025 (30th September 2024), as recorded in the annual return, is 31/03/2027.", + { previousFinish: "2026-06-30", currentFinish: "2026-06-30" }, + ); + assert.equal(result.publishedDateCheck?.narrativeDate, "2027-03-31"); +}); + +it("an on-track claim for the explicitly stated new finish explains that date", () => { + const result = engine.detectScheduleClaims("The programme is on track to complete by 31 March 2027.", { + previousFinish: "2026-06-30", currentFinish: "2027-03-31", + }); + assert.equal(result.contradiction, null); +}); +it("accepts qualified whole-programme subjects", () => { + const result = engine.detectScheduleClaims("The programme overall remains firmly on track.", { + previousFinish: "2026-06-30", currentFinish: "2027-03-31", + }); + assert.equal(result.contradiction?.kind, "says-unchanged"); +}); + +it("a later phase reference does not change the programme subject", () => { + const result = engine.detectScheduleClaims("The programme remains on track, with phase reviews continuing.", { + previousFinish: "2026-06-30", currentFinish: "2027-03-31", + }); + assert.equal(result.contradiction?.kind, "says-unchanged"); +}); +it("a named current finish elsewhere qualifies an on-track assessment", () => { + const result = engine.detectScheduleClaims("The programme remains on track. The completion date is now 31 March 2027.", { + previousFinish: "2026-06-30", currentFinish: "2027-03-31", + }); + assert.equal(result.contradiction, null); +}); + +it("recognises an end-date extension without an auxiliary verb", () => { + const result = engine.detectScheduleClaims("The programme remains on track. The end date extended to 31 March 2027.", { previousFinish: "2026-06-30", currentFinish: "2027-03-31" }); + assert.equal(result.contradiction, null); +}); + +describe("forecast finish assertions", () => { + for (const sentence of ["The project completion date will be 31 March 2027.", "The project end date has been set for 31 March 2027.", "The programme end date: 31 March 2027."]) { + it(sentence, () => { + const r = engine.detectScheduleClaims(sentence, {previousFinish:"2026-06-30", currentFinish:"2026-06-30"}); + assert.equal(r.publishedDateCheck?.narrativeDate, "2027-03-31"); + }); + } +}); + +describe("whole-programme assertions and stated delay", () => { + for (const sentence of ["The programme remains in line with plan.", "The project shows no deviation."]) { + it(sentence, () => assert.equal(engine.detectScheduleClaims(sentence, {previousFinish:"2026-06-30",currentFinish:"2027-03-31"}).contradiction?.kind, "says-unchanged")); + } + it("programme delay explains a later finish", () => { + const r = engine.detectScheduleClaims("The programme remains on track. Delivery has been delayed by nine months.", {previousFinish:"2026-06-30",currentFinish:"2027-03-31"}); + assert.equal(r.contradiction, null); + }); + it("a bare completion label names the current finish", () => { + const r = engine.detectScheduleClaims("Anticipated completion: March 2027.", {previousFinish:"2026-06-30",currentFinish:"2026-06-30"}); + assert.equal(r.publishedDateCheck?.narrativeDate, "2027-03-31"); + }); +}); + +it("programme-level delay wording explains a later finish", () => { + for (const sentence of ["The programme remains on track. The programme has encountered delays.", "The programme remains on track. The completion date has slipped."]) { + assert.equal(engine.detectScheduleClaims(sentence, {previousFinish:"2026-06-30",currentFinish:"2027-03-31"}).contradiction, null); + } +}); + +it("reads a programme end assertion without the word date", () => { + const r = engine.detectScheduleClaims("The project end is March 2027.", {previousFinish:"2026-06-30",currentFinish:"2026-06-30"}); + assert.equal(r.publishedDateCheck?.narrativeDate, "2027-03-31"); +}); +it("recognises earlier and later programme finish explanations", () => { + for (const [text, current] of [["The programme remains on track. The project end date is earlier following replanning.", "2026-03-31"], ["The programme remains on track. The end date is later following replanning.", "2027-03-31"]]) { + assert.equal(engine.detectScheduleClaims(text, {previousFinish:"2026-06-30",currentFinish:current}).contradiction, null); + } +}); + +it("does not interpret an intermediate delivery target as whole-programme stability", () => { + for (const sentence of ["The programme remains on track to achieve its procurement milestones.", "The project remains on schedule for phase 2 delivery."]) { + assert.equal(engine.detectScheduleClaims(sentence, {previousFinish:"2026-06-30",currentFinish:"2027-03-31"}).contradiction, null); + } +}); + +it("intermediate capability targets are not whole-programme end claims", () => { + for (const sentence of ["The programme remains on schedule for initial operating capability.", "The programme remains on track for the in-service date."]) { + assert.equal(engine.detectScheduleClaims(sentence, {previousFinish:"2026-06-30",currentFinish:"2027-03-31"}).contradiction, null); + } +}); + +describe("shared finding sentences", () => { + it("formats a published-date check consistently in UK English", () => { + const options = { previousFinish: "2026-06-30", currentFinish: "2026-06-30" }; + const claims = engine.detectScheduleClaims("Completion is now expected in March 2027.", options); + const sentence = "The narrative gives the end date as 31 Mar 2027; the published end date is 30 Jun 2026. Check which is current."; + assert.equal(engine.findingSentence(claims, options), sentence); + assert.equal(claims.publishedDateCheck.detail, sentence); + }); + it("reports an explained move", () => { + const options = { previousFinish: "2026-06-30", currentFinish: "2027-03-31" }; + const claims = engine.detectScheduleClaims("The end date moved from 30 June 2026 to 31 March 2027.", options); + assert.equal(engine.findingSentence(claims, options), "The narrative explains the move."); + }); +}); + +it("ships the same claim rules in the browser and Node", () => { + const context = vm.createContext({}); + vm.runInContext(fs.readFileSync(path.join(REPO, "docs/engine/projectlens-engine.js"), "utf8"), context); + const browserRules = JSON.parse(JSON.stringify(context.ProjectLensEngine.loadClaimRules())); + assert.deepEqual(browserRules, engine.loadClaimRules()); + const options = { previousFinish: "2026-06-30", currentFinish: "2027-03-31" }; + const result = context.ProjectLensEngine.detectScheduleClaims("The project is progressing to plan.", options); + assert.equal(result.contradiction?.kind, "says-unchanged"); +}); + +it("keeps stability attached to the nearest subject, including explicit completion wording", () => { + for (const sentence of ["Phase 2 completion remains on track.", "The programme's procurement completion is on schedule.", "The contract end date is unchanged."]) { + assert.equal(engine.detectScheduleClaims(sentence, {previousFinish:"2026-06-30",currentFinish:"2027-03-31"}).contradiction, null); + } +}); + +describe("finish clauses without an is cue", () => { + for (const sentence of [ + "The programme will finish on 31 March 2027.", + "The planned completion by March 2027 remains achievable.", + "The current completion date: March 2027.", + "The expected project closure is March 2027.", + ]) { + it(sentence, () => { + const r = engine.detectScheduleClaims(sentence, {previousFinish:"2026-06-30",currentFinish:"2026-06-30"}); + assert.equal(r.publishedDateCheck?.narrativeDate, "2027-03-31"); + }); + } +}); + +describe("current completion predicates", () => { + for (const sentence of [ + "The programme will now be completed by March 2027.", + "The project will complete in March 2027.", + "The programme will be delivered by March 2027.", + "Forecast completion March 2027.", + "The project is due to end in March 2027.", + ]) { + it(sentence, () => { + const r = engine.detectScheduleClaims(sentence, {previousFinish:"2026-06-30",currentFinish:"2026-06-30"}); + assert.equal(r.publishedDateCheck?.narrativeDate, "2027-03-31"); + }); + } +}); + +describe("whole-programme stability predicates", () => { + for (const sentence of [ + "The programme continues to be on track.", + "The project schedule remains on track.", + "The programme is still running on schedule.", + "The overall schedule remains on track.", + ]) { + it(sentence, () => assert.equal(engine.detectScheduleClaims(sentence, {previousFinish:"2026-06-30",currentFinish:"2027-03-31"}).contradiction?.kind, "says-unchanged")); + } +}); + +// Authored narrative sentences for miss categories in the seen public-record sets. +describe("Round 5 schedule claims and finish formats", () => { + const moved = { previousFinish: "2028-09-18", currentFinish: "2029-02-12" }; + for (const sentence of [ + "On schedule.", + "No deviation from the agreed schedule.", + "The delivery schedule has remained stable during this review.", + "The programme is on-track with no changes to the dates of key milestones.", + "The project ran to agreed schedule.", + "The programme continued as scheduled.", + "The construction phase was extended. This will not impact on the project end date.", + ]) { + it(`flags stability: ${sentence}`, () => { + assert.equal(engine.detectScheduleClaims(sentence, moved).contradiction?.kind, "says-unchanged"); + }); + } + for (const sentence of [ + "The project will complete in 2028.", + "The programme will start migration in July 2028 and complete in November 2028.", + "The end date is estimated as 2028-Q4.", + "An extension was approved to extend the end date to 18/09/2028.", + "Closed as planned in November 2028.", + "Final programme closure took place in November 2028.", + "The programme will not close down until 18 September 2028.", + ]) { + it(`checks a named finish: ${sentence}`, () => { + const result = engine.detectScheduleClaims(sentence, { + previousFinish: "2027-04-01", currentFinish: "2027-04-01", + }); + assert.equal(result.contradiction, null); + assert.ok(result.publishedDateCheck, JSON.stringify(result.dates)); + }); + } + for (const sentence of [ + "The project will complete in 2029.", + "The end date remains 2029-Q1.", + ]) { + it(`respects date precision: ${sentence}`, () => { + const result = engine.detectScheduleClaims(sentence, moved); + assert.equal(result.contradiction, null); + assert.equal(result.publishedDateCheck, null); + }); + } + for (const sentence of [ + "The phase is on schedule.", + "The programme remains on track for its procurement milestones.", + "The programme is not on schedule.", + "The review took place in November 2028.", + "The contract closed as planned in November 2028.", + "The programme remains on track. The end date moved to 12 February 2029.", + ]) { + it(`keeps scope or explanation: ${sentence}`, () => { + const result = engine.detectScheduleClaims(sentence, moved); + assert.equal(result.contradiction, null); + assert.equal(result.publishedDateCheck, null); + }); + } + it("keeps an actual closure separate from a forecast finish after a stated overrun", () => { + const result = engine.detectScheduleClaims( + "The project closed on 25 March 2029. Handover continued beyond the original plan.", moved, + ); + assert.equal(result.dates[0].role, "actual-finish"); + assert.equal(result.contradiction, null); + }); + it("an actual closure date does not qualify an earlier on-schedule claim", () => { + const result = engine.detectScheduleClaims( + "The programme remained on schedule and formally closed on 12 February 2029.", moved, + ); + assert.equal(result.contradiction?.kind, "says-unchanged"); + }); +}); + +describe("Round 5 finding evidence", () => { + const dates = { previousFinish: "2027-12-15", currentFinish: "2028-02-26" }; + it("returns the exact sentence and phrase despite normalised spacing", () => { + const sentence = "The programme REMAINS\u00a0 on\ntrack; all checks continue."; + const result = engine.detectScheduleClaims(`An earlier review took place. ${sentence} More information follows.`, dates); + assert.deepEqual(result.evidence, { + sentence, phrase: "REMAINS\u00a0 on\ntrack", ...dates, + }); + assert.equal(engine.findingSentence(result, dates), + "The update says 'REMAINS on track'. The schedule's finish moved from 15 Dec 2027 to 26 Feb 2028 (73 days)."); + }); + it("returns evidence for a published-date check", () => { + const sentence = "The end date remains 18/09/2028."; + const result = engine.detectScheduleClaims(`The review finished. ${sentence}`, { + previousFinish: "2028-04-01", currentFinish: "2028-04-01", + }); + assert.deepEqual(result.evidence, { + sentence, phrase: "18/09/2028", narrativeDate: "2028-09-18", + previousFinish: "2028-04-01", currentFinish: "2028-04-01", + }); + }); + it("keeps the whole sentence rather than a bounded clause", () => { + const sentence = `The programme remains on schedule, ${"with review work continuing, ".repeat(8)}and the review is complete.`; + assert.equal(engine.detectScheduleClaims(sentence, dates).evidence?.sentence, sentence); + }); + it("returns the mismatched date as evidence", () => { + const sentence = "The project will complete by 15 December 2027."; + const evidence = engine.detectScheduleClaims(sentence, dates).evidence; + assert.equal(evidence?.sentence, sentence); + assert.equal(evidence?.phrase, "15 December 2027"); + assert.equal(evidence?.narrativeDate, dates.previousFinish); + }); + it("returns direction-only evidence when the stated direction disagrees", () => { + const sentence = "The end date was extended following review."; + const result = engine.detectScheduleClaims(sentence, { + previousFinish: "2028-02-26", currentFinish: "2027-12-15", + }); + assert.equal(result.evidence?.sentence, sentence); + assert.equal(result.evidence?.phrase, "was extended"); + }); + it("returns no finding evidence for an explained move", () => { + assert.equal(engine.detectScheduleClaims("The end date moved to 26 February 2028.", dates).evidence, null); + }); + for (const date of ["2029", "2029-Q1"]) { + it(`keeps the stated precision in the finding for ${date}`, () => { + const options = { previousFinish: "2027-12-15", currentFinish: "2027-12-15" }; + const result = engine.detectScheduleClaims(`The end date remains ${date}.`, options); + assert.equal(engine.findingSentence(result, options), + `The narrative gives the end date as ${date}; the published end date is 15 Dec 2027. Check which is current.`); + assert.equal(result.publishedDateCheck.detail, engine.findingSentence(result, options)); + }); + } +}); diff --git a/tests/engine/hygiene.test.mjs b/tests/engine/hygiene.test.mjs new file mode 100644 index 0000000..3ec1f5a --- /dev/null +++ b/tests/engine/hygiene.test.mjs @@ -0,0 +1,75 @@ +// Real-export hygiene: encodings, multi-project listing, completed-work float, speed. +import assert from "node:assert/strict"; +import { createRequire } from "node:module"; +import fs from "node:fs"; +import path from "node:path"; +import { fileURLToPath } from "node:url"; +import { describe, it } from "node:test"; + +const __dirname = path.dirname(fileURLToPath(import.meta.url)); +const REPO = path.resolve(__dirname, "../.."); +const RESEARCH = path.resolve(REPO, "../research_notes/Real case tests/projectlens-inputs"); +const require = createRequire(import.meta.url); +const engine = require(path.join(REPO, "docs/engine/projectlens-engine.js")); + +const DEFAULT_RULES = { + maxDurationHours: 20 * 8, + materialSlipDays: 10, + floatThresholdHours: 0, + nearCriticalHours: 10 * 8, + executiveChangeLimit: 50, + allowPositiveLag: false, +}; + +describe("real-export hygiene", () => { + it("decodeXerBytes reads Windows-1252 Café", () => { + assert.equal(typeof engine.decodeXerBytes, "function"); + // Cafés: C a f é as Windows-1252 (é = 0xE9) + const bytes = Uint8Array.from([0x43, 0x61, 0x66, 0xE9]); + const decoded = engine.decodeXerBytes(bytes); + assert.equal(decoded.text, "Café"); + assert.equal(decoded.encoding, "windows-1252"); + }); + + it("listProjects finds 2+ projects in the multi-project variant", () => { + assert.equal(typeof engine.listProjects, "function"); + const text = fs.readFileSync(path.join(RESEARCH, "variants/R4-multiproject/two-projects.xer"), "utf8"); + const projects = engine.listProjects(text); + assert.ok(projects.length >= 2, `got ${projects.length}`); + assert.ok(projects.every(p => p.projId && p.activityCount >= 0)); + }); + + it("completed-work-only update does not raise Evidence gap for blank float", () => { + // R1 current has blank float on completed activities — that must not be an evidence gap. + const previous = engine.parseXerAssurance( + fs.readFileSync(path.join(RESEARCH, "variants/R1-airport-terminal2/previous.xer"), "utf8"), + "previous.xer", + ); + const current = engine.parseXerAssurance( + fs.readFileSync(path.join(RESEARCH, "variants/R1-airport-terminal2/current.xer"), "utf8"), + "current.xer", + ); + const review = engine.analyseReview( + previous, + current, + "The finish moved later as planned. Owner: Planner. Due 1 Jan 2013.", + ); + assert.ok( + !review.blockers.some(b => b.type === "Evidence gap" && /float values could not be compared/i.test(b.title)), + JSON.stringify(review.blockers.map(b => b.title)), + ); + }); + + it("6,977-activity file compares in under 2000 ms", () => { + const prevPath = path.join(RESEARCH, "variants/R2-rehab-large/previous.xer"); + const curPath = path.join(RESEARCH, "variants/R2-rehab-large/current.xer"); + const prevText = fs.readFileSync(prevPath); + const curText = fs.readFileSync(curPath); + const t0 = Date.now(); + const previous = engine.parseXer(engine.decodeXerBytes(prevText).text, "previous.xer"); + const current = engine.parseXer(engine.decodeXerBytes(curText).text, "current.xer"); + engine.compareSchedules(previous, current, DEFAULT_RULES); + const ms = Date.now() - t0; + assert.ok(ms < 2000, `took ${ms} ms`); + }); +}); diff --git a/tests/engine/identity.test.mjs b/tests/engine/identity.test.mjs new file mode 100644 index 0000000..dec4478 --- /dev/null +++ b/tests/engine/identity.test.mjs @@ -0,0 +1,64 @@ +// Project identity via activity-code overlap (renamed / re-numbered schedules). +import assert from "node:assert/strict"; +import { createRequire } from "node:module"; +import fs from "node:fs"; +import path from "node:path"; +import { fileURLToPath } from "node:url"; +import { describe, it } from "node:test"; + +const __dirname = path.dirname(fileURLToPath(import.meta.url)); +const REPO = path.resolve(__dirname, "../.."); +const RESEARCH = path.resolve(REPO, "../research_notes/Real case tests/projectlens-inputs"); +const require = createRequire(import.meta.url); +const engine = require(path.join(REPO, "docs/engine/projectlens-engine.js")); + +function read(rel) { + return fs.readFileSync(path.join(RESEARCH, "real-xer", rel), "utf8"); +} + +function rewriteIdentity(text, { projId, shortName }) { + // Rewrite PROJECT identity fields only; keep every task_code so overlap stays high. + return text.split(/\r?\n/).map(line => { + const cells = line.split("\t"); + if (cells[0] === "%F" && cells.includes("proj_id")) { + rewriteIdentity._fields = cells.slice(1); + return line; + } + if (cells[0] === "%R" && rewriteIdentity._fields) { + const fields = rewriteIdentity._fields; + const row = Object.fromEntries(fields.map((f, i) => [f, cells[i + 1] ?? ""])); + if ("proj_id" in row) row.proj_id = projId; + if ("proj_short_name" in row) row.proj_short_name = shortName; + return ["%R", ...fields.map(f => row[f] ?? "")].join("\t"); + } + if (cells[0] === "%T") rewriteIdentity._fields = null; + return line; + }).join("\n"); +} + +describe("matchProjects", () => { + it("exports matchProjects", () => { + assert.equal(typeof engine.matchProjects, "function"); + }); + + it("same real-xer with rewritten proj_id and name scores same", () => { + const original = read("xer-splitter-airport/airport.xer"); + const rewritten = rewriteIdentity(original, { projId: "99999", shortName: "TERMINAL-2-UPD01" }); + const previous = engine.parseXerAssurance(original, "airport.xer"); + // Assurance parser rejects multi-project; airport is single-project. + // Use review parser for the rewritten copy then build a minimal assurance-like view via parseXerAssurance. + const current = engine.parseXerAssurance(rewritten, "airport-renamed.xer"); + const match = engine.matchProjects(previous, current); + assert.ok(match.score >= 0.8, `score ${match.score}`); + assert.equal(match.decision, "same"); + assert.ok(match.shared > 0); + }); + + it("two unrelated real-xer files score different", () => { + const a = engine.parseXerAssurance(read("ashspace-sample/sample.xer"), "ashspace.xer"); + const b = engine.parseXerAssurance(read("p6-analyzer-example/example_xer_file.xer"), "example.xer"); + const match = engine.matchProjects(a, b); + assert.ok(match.score < 0.5, `score ${match.score}`); + assert.equal(match.decision, "different"); + }); +}); diff --git a/tests/engine/parity.test.mjs b/tests/engine/parity.test.mjs new file mode 100644 index 0000000..44ad4bd --- /dev/null +++ b/tests/engine/parity.test.mjs @@ -0,0 +1,217 @@ +// Parity: shared engine must match origin/main page engines on Northstar + real XERs. +import assert from "node:assert/strict"; +import { createRequire } from "node:module"; +import { execFileSync } from "node:child_process"; +import fs from "node:fs"; +import path from "node:path"; +import vm from "node:vm"; +import { fileURLToPath } from "node:url"; +import { describe, it } from "node:test"; + +const __dirname = path.dirname(fileURLToPath(import.meta.url)); +const REPO = path.resolve(__dirname, "../.."); +const RESEARCH = path.resolve(REPO, "../research_notes/Real case tests/projectlens-inputs"); +const require = createRequire(import.meta.url); + +const DEFAULT_RULES = { + maxDurationHours: 20 * 8, + materialSlipDays: 10, + floatThresholdHours: 0, + nearCriticalHours: 10 * 8, + executiveChangeLimit: 10, + allowPositiveLag: false, +}; + +const REAL_XER_SEVEN = [ + "xer-splitter-airport/airport.xer", + "xer-splitter-rehab/rehab-2.xer", + "ashspace-sample/sample.xer", + "p6-analyzer-example/example_xer_file.xer", + "mpxj-calendar/ProjectDefaultCalendar.xer", + "mpxj-percent/percent-complete-8.4.xer", + "mpxj-rates/resource-rates-test.xer", +]; + +function gitShow(relPath) { + return execFileSync("git", ["show", `origin/main:${relPath}`], { + cwd: REPO, + encoding: "utf8", + maxBuffer: 20 * 1024 * 1024, + }); +} + +function slice(source, startMarker, endMarker) { + const start = source.indexOf(startMarker); + const end = source.indexOf(endMarker, start); + if (start < 0 || end < 0) throw new Error(`Markers not found: ${startMarker} / ${endMarker}`); + return source.slice(start, end); +} + +function loadLegacyEngines() { + const ca = gitShow("docs/change-assurance.js"); + const xr = gitShow("docs/xer-review.js"); + const caCode = slice(ca, "function escapeHtml(", "function showToast("); + const xrCode = slice(xr, "function numberValue(", "function updateFileCard("); + const caCtx = vm.createContext({ Intl, Date, Math, Number, String, JSON, Map, Set, Error, console }); + vm.runInContext(`${caCode}\n;globalThis.__e = { parseXer, analyseReview, taskChanges };`, caCtx); + const xrCtx = vm.createContext({ Intl, Date, Math, Number, String, JSON, Map, Set, Error, console }); + vm.runInContext(`${xrCode}\n;globalThis.__e = { parseXer, buildReview, compareSchedules, parseEvidenceText };`, xrCtx); + return { assurance: caCtx.__e, review: xrCtx.__e }; +} + +function readUtf8(file) { + return new TextDecoder("utf-8").decode(fs.readFileSync(file)); +} + +function isMapLike(value) { + return Boolean(value) && typeof value.get === "function" && typeof value.keys === "function" && value[Symbol.iterator]; +} + +function isSetLike(value) { + return Boolean(value) && typeof value.has === "function" && typeof value.add === "function" && value[Symbol.iterator] && value.size !== undefined && !isMapLike(value); +} + +function stripVolatile(value) { + if (value instanceof Date) return value.toISOString(); + // instanceof fails across node:vm realms, so duck-type Map/Set. + if (isMapLike(value)) { + return { __map: [...value.entries()].map(([k, v]) => [k, stripVolatile(v)]) }; + } + if (isSetLike(value)) { + return { __set: [...value].map(stripVolatile).sort() }; + } + // Copy into this realm: legacy engines run in node:vm, and vm arrays fail deepEqual. + if (Array.isArray(value)) return Array.from(value, stripVolatile); + if (value && typeof value === "object") { + const out = {}; + for (const [key, child] of Object.entries(value)) { + // Skip timestamps, raw XER rows, and nested schedule graphs (they embed the same rows). + if ( + key === "generatedAt" + || key === "raw" + || key === "tables" + || key === "previous" + || key === "current" + || key === "before" + || key === "after" + || key === "baseline" + || key === "taskById" + || key === "taskByCode" + || key === "sourceText" + ) continue; + out[key] = stripVolatile(child); + } + return out; + } + return value; +} + +function loadEngine() { + return require(path.join(REPO, "docs/engine/projectlens-engine.js")); +} + +describe("ProjectLensEngine parity with origin/main", () => { + it("exports the shared surface", () => { + const engine = loadEngine(); + for (const name of [ + "parseXer", + "parseXerAssurance", + "taskChanges", + "analyseReview", + "compareSchedules", + "buildReview", + "parseEvidenceText", + ]) { + assert.equal(typeof engine[name], "function", `missing ${name}`); + } + }); + + it("matches Northstar assurance and schedule-review outputs", () => { + const legacy = loadLegacyEngines(); + const engine = loadEngine(); + const prevPath = path.join(REPO, "docs/demo/northstar-previous.xer"); + const curPath = path.join(REPO, "docs/demo/northstar-current.xer"); + const narrative = fs.readFileSync(path.join(REPO, "docs/demo/northstar-narrative.txt"), "utf8"); + const prevText = readUtf8(prevPath); + const curText = readUtf8(curPath); + + const legacyPrevA = legacy.assurance.parseXer(prevText, "northstar-previous.xer"); + const legacyCurA = legacy.assurance.parseXer(curText, "northstar-current.xer"); + const legacyReviewA = legacy.assurance.analyseReview(legacyPrevA, legacyCurA, narrative.trim()); + + const engPrevA = engine.parseXerAssurance(prevText, "northstar-previous.xer"); + const engCurA = engine.parseXerAssurance(curText, "northstar-current.xer"); + const engReviewA = engine.analyseReview(engPrevA, engCurA, narrative.trim()); + // Schedule deltas must stay byte-identical to origin/main; narrative claim wording may evolve. + assert.equal(engReviewA.finishMovement, legacyReviewA.finishMovement); + assert.deepEqual(stripVolatile(engReviewA.changes), stripVolatile(legacyReviewA.changes)); + assert.ok(engReviewA.blockers.some(b => b.type === "Contradiction")); + + const legacyPrevR = legacy.review.parseXer(prevText, "northstar-previous.xer"); + const legacyCurR = legacy.review.parseXer(curText, "northstar-current.xer"); + const legacyReviewR = legacy.review.buildReview(legacyPrevR, legacyCurR, narrative.trim(), DEFAULT_RULES, {}, null); + + const engPrevR = engine.parseXer(prevText, "northstar-previous.xer"); + const engCurR = engine.parseXer(curText, "northstar-current.xer"); + const engReviewR = engine.buildReview(engPrevR, engCurR, narrative.trim(), DEFAULT_RULES, {}, null); + assert.equal(engReviewR.finishMovement.days, legacyReviewR.finishMovement.days); + assert.deepEqual(stripVolatile(engReviewR.changes), stripVolatile(legacyReviewR.changes)); + assert.ok(engReviewR.conflicts.some(c => /contradiction/i.test(c.type))); + }); + + it("parses the seven real public XER samples like origin/main", () => { + const legacy = loadLegacyEngines(); + const engine = loadEngine(); + for (const rel of REAL_XER_SEVEN) { + const file = path.join(RESEARCH, "real-xer", rel); + assert.ok(fs.existsSync(file), `missing fixture ${rel}`); + const text = readUtf8(file); + const name = path.basename(file); + + let legacyReviewResult; + let legacyReviewError; + try { + legacyReviewResult = stripVolatile(legacy.review.parseXer(text, name)); + } catch (error) { + legacyReviewError = error.message; + } + + let engReviewResult; + let engReviewError; + try { + engReviewResult = stripVolatile(engine.parseXer(text, name)); + } catch (error) { + engReviewError = error.message; + } + assert.equal(engReviewError, legacyReviewError, `review parse error mismatch for ${rel}`); + if (!legacyReviewError) { + assert.equal(engReviewResult.tasks.length, legacyReviewResult.tasks.length); + assert.equal(engReviewResult.project.name, legacyReviewResult.project.name); + assert.equal(engReviewResult.project.id, legacyReviewResult.project.id); + } + + let legacyAssuranceResult; + let legacyAssuranceError; + try { + legacyAssuranceResult = stripVolatile(legacy.assurance.parseXer(text, name)); + } catch (error) { + legacyAssuranceError = error.message; + } + + let engAssuranceResult; + let engAssuranceError; + try { + engAssuranceResult = stripVolatile(engine.parseXerAssurance(text, name)); + } catch (error) { + engAssuranceError = error.message; + } + assert.equal(engAssuranceError, legacyAssuranceError, `assurance parse error mismatch for ${rel}`); + if (!legacyAssuranceError) { + // status/type were added for float-gap hygiene; compare the original contract fields only. + assert.equal(engAssuranceResult.tasks.length, legacyAssuranceResult.tasks.length); + assert.equal(engAssuranceResult.project.name, legacyAssuranceResult.project.name); + assert.equal(engAssuranceResult.project.id, legacyAssuranceResult.project.id); + } + } + }); +}); diff --git a/tests/engine/xml.test.mjs b/tests/engine/xml.test.mjs new file mode 100644 index 0000000..875a73e --- /dev/null +++ b/tests/engine/xml.test.mjs @@ -0,0 +1,54 @@ +// Same mini schedule in XER, P6 XML and MSPDI must yield the same taskChanges. +import assert from "node:assert/strict"; +import { createRequire } from "node:module"; +import fs from "node:fs"; +import path from "node:path"; +import { fileURLToPath } from "node:url"; +import { describe, it } from "node:test"; + +const __dirname = path.dirname(fileURLToPath(import.meta.url)); +const REPO = path.resolve(__dirname, "../.."); +const FIX = path.join(REPO, "tests/fixtures/schedules"); +const require = createRequire(import.meta.url); +const engine = require(path.join(REPO, "docs/engine/projectlens-engine.js")); +require(path.join(REPO, "docs/engine/xml-schedules.js")); // attaches parseP6Xml / parseMspdiXml + +function summarise(changes) { + return changes.changes + .map(c => `${c.code}:${c.summary}`) + .sort(); +} + +describe("XML schedule parsers", () => { + it("exports parseP6Xml and parseMspdiXml", () => { + assert.equal(typeof engine.parseP6Xml, "function"); + assert.equal(typeof engine.parseMspdiXml, "function"); + }); + + it("XER, P6 XML and MSPDI give the same taskChanges against the edited copy", () => { + const xerPrev = engine.parseXerAssurance(fs.readFileSync(path.join(FIX, "mini-previous.xer"), "utf8"), "mini-previous.xer"); + const xerCur = engine.parseXerAssurance(fs.readFileSync(path.join(FIX, "mini-current.xer"), "utf8"), "mini-current.xer"); + const xerChanges = engine.taskChanges(xerPrev, xerCur); + + const p6Prev = engine.parseP6Xml(fs.readFileSync(path.join(FIX, "mini-previous.p6.xml"), "utf8"), "mini-previous.p6.xml"); + const p6Cur = engine.parseP6Xml(fs.readFileSync(path.join(FIX, "mini-current.p6.xml"), "utf8"), "mini-current.p6.xml"); + // Convert review-shaped XML parses into assurance shape for taskChanges. + const toAssurance = parsed => ({ + ...parsed, + sourceText: parsed.sourceText || JSON.stringify(parsed.project), + taskByCode: new Map(parsed.tasks.map(t => [t.code, t])), + relations: parsed.relations instanceof Set + ? parsed.relations + : new Set((parsed.relations || []).map(r => JSON.stringify([r.predecessorCode, r.taskCode, r.type || "PR_FS", r.lag || 0]))), + }); + const p6Changes = engine.taskChanges(toAssurance(p6Prev), toAssurance(p6Cur)); + + const mspPrev = engine.parseMspdiXml(fs.readFileSync(path.join(FIX, "mini-previous.mspdi.xml"), "utf8"), "mini-previous.mspdi.xml"); + const mspCur = engine.parseMspdiXml(fs.readFileSync(path.join(FIX, "mini-current.mspdi.xml"), "utf8"), "mini-current.mspdi.xml"); + const mspChanges = engine.taskChanges(toAssurance(mspPrev), toAssurance(mspCur)); + + assert.deepEqual(summarise(p6Changes), summarise(xerChanges)); + assert.deepEqual(summarise(mspChanges), summarise(xerChanges)); + assert.ok(xerChanges.changes.length > 0); + }); +}); diff --git a/tests/fixtures/schedules/SOURCE.md b/tests/fixtures/schedules/SOURCE.md new file mode 100644 index 0000000..caa9418 --- /dev/null +++ b/tests/fixtures/schedules/SOURCE.md @@ -0,0 +1,7 @@ +# Schedule fixtures for XML parity tests + +These miniature schedules are reconstructed for ProjectLens tests. They are not +taken from a live project. They exist only so the same activity codes and finish +dates can be expressed as XER, Primavera P6 XML (PMXML) and MS Project MSPDI XML. + +Licence: CC0 / public domain dedication for test use. diff --git a/tests/fixtures/schedules/mini-current.mspdi.xml b/tests/fixtures/schedules/mini-current.mspdi.xml new file mode 100644 index 0000000..710a303 --- /dev/null +++ b/tests/fixtures/schedules/mini-current.mspdi.xml @@ -0,0 +1,54 @@ + + + + MINI + 1 + 2026-02-01T00:00:00 + 2026-07-31T00:00:00 + 2026-02-01T00:00:00 + + + 10 + 1 + Design + MN-100 + 2026-02-15T00:00:00 + 2026-04-30T00:00:00 + PT160H0M0S + PT16H0M0S + 0 + + + 20 + 2 + Build + MN-200 + 2026-05-01T00:00:00 + 2026-06-30T00:00:00 + PT320H0M0S + PT0H0M0S + 0 + + 10 + 1 + 0 + + + + 30 + 3 + Complete + MN-900 + 2026-07-31T00:00:00 + 2026-07-31T00:00:00 + PT0H0M0S + PT0H0M0S + 1 + + 20 + 1 + 0 + + + + diff --git a/tests/fixtures/schedules/mini-current.p6.xml b/tests/fixtures/schedules/mini-current.p6.xml new file mode 100644 index 0000000..3fec4cd --- /dev/null +++ b/tests/fixtures/schedules/mini-current.p6.xml @@ -0,0 +1,58 @@ + + + + + 1 + MINI + MINI + 2026-02-01T00:00:00 + 2026-07-31T00:00:00 + + 10 + MN-100 + Design + Task Dependent + Not Started + 160h + 2026-02-15T00:00:00 + 2026-04-30T00:00:00 + 16h + + + 20 + MN-200 + Build + Task Dependent + Not Started + 320h + 2026-05-01T00:00:00 + 2026-06-30T00:00:00 + 0h + + + 30 + MN-900 + Complete + Finish Milestone + Not Started + 0h + 2026-07-31T00:00:00 + 2026-07-31T00:00:00 + 0h + + + 1 + 10 + 20 + Finish to Start + 0h + + + 2 + 20 + 30 + Finish to Start + 0h + + + diff --git a/tests/fixtures/schedules/mini-current.xer b/tests/fixtures/schedules/mini-current.xer new file mode 100644 index 0000000..9c7442f --- /dev/null +++ b/tests/fixtures/schedules/mini-current.xer @@ -0,0 +1,13 @@ +ERMHDR 8.0 2026-02-01 Project admin ProjectLens test dbxDatabaseNoName Project Management GBP +%T PROJECT +%F proj_id proj_short_name scd_end_date last_recalc_date plan_end_date +%R 1 MINI 2026-07-31 00:00 2026-02-01 00:00 2026-07-31 00:00 +%T TASK +%F task_id proj_id task_code task_name task_type status_code total_float_hr_cnt early_end_date early_start_date target_drtn_hr_cnt +%R 10 1 MN-100 Design TT_Task TK_NotStart 16 2026-04-30 00:00 2026-02-15 00:00 160 +%R 20 1 MN-200 Build TT_Task TK_NotStart 0 2026-06-30 00:00 2026-05-01 00:00 320 +%R 30 1 MN-900 Complete TT_FinMile TK_NotStart 0 2026-07-31 00:00 2026-07-31 00:00 0 +%T TASKPRED +%F task_pred_id task_id pred_task_id pred_type lag_hr_cnt +%R 1 20 10 PR_FS 0 +%R 2 30 20 PR_FS 0 diff --git a/tests/fixtures/schedules/mini-previous.mspdi.xml b/tests/fixtures/schedules/mini-previous.mspdi.xml new file mode 100644 index 0000000..9c777fd --- /dev/null +++ b/tests/fixtures/schedules/mini-previous.mspdi.xml @@ -0,0 +1,54 @@ + + + + MINI + 1 + 2026-01-01T00:00:00 + 2026-06-30T00:00:00 + 2026-01-01T00:00:00 + + + 10 + 1 + Design + MN-100 + 2026-01-15T00:00:00 + 2026-03-31T00:00:00 + PT160H0M0S + PT40H0M0S + 0 + + + 20 + 2 + Build + MN-200 + 2026-04-01T00:00:00 + 2026-05-31T00:00:00 + PT320H0M0S + PT16H0M0S + 0 + + 10 + 1 + 0 + + + + 30 + 3 + Complete + MN-900 + 2026-06-30T00:00:00 + 2026-06-30T00:00:00 + PT0H0M0S + PT0H0M0S + 1 + + 20 + 1 + 0 + + + + diff --git a/tests/fixtures/schedules/mini-previous.p6.xml b/tests/fixtures/schedules/mini-previous.p6.xml new file mode 100644 index 0000000..50dd81d --- /dev/null +++ b/tests/fixtures/schedules/mini-previous.p6.xml @@ -0,0 +1,58 @@ + + + + + 1 + MINI + MINI + 2026-01-01T00:00:00 + 2026-06-30T00:00:00 + + 10 + MN-100 + Design + Task Dependent + Not Started + 160h + 2026-01-15T00:00:00 + 2026-03-31T00:00:00 + 40h + + + 20 + MN-200 + Build + Task Dependent + Not Started + 320h + 2026-04-01T00:00:00 + 2026-05-31T00:00:00 + 16h + + + 30 + MN-900 + Complete + Finish Milestone + Not Started + 0h + 2026-06-30T00:00:00 + 2026-06-30T00:00:00 + 0h + + + 1 + 10 + 20 + Finish to Start + 0h + + + 2 + 20 + 30 + Finish to Start + 0h + + + diff --git a/tests/fixtures/schedules/mini-previous.xer b/tests/fixtures/schedules/mini-previous.xer new file mode 100644 index 0000000..1d5a9c9 --- /dev/null +++ b/tests/fixtures/schedules/mini-previous.xer @@ -0,0 +1,13 @@ +ERMHDR 8.0 2026-01-01 Project admin ProjectLens test dbxDatabaseNoName Project Management GBP +%T PROJECT +%F proj_id proj_short_name scd_end_date last_recalc_date plan_end_date +%R 1 MINI 2026-06-30 00:00 2026-01-01 00:00 2026-06-30 00:00 +%T TASK +%F task_id proj_id task_code task_name task_type status_code total_float_hr_cnt early_end_date early_start_date target_drtn_hr_cnt +%R 10 1 MN-100 Design TT_Task TK_NotStart 40 2026-03-31 00:00 2026-01-15 00:00 160 +%R 20 1 MN-200 Build TT_Task TK_NotStart 16 2026-05-31 00:00 2026-04-01 00:00 320 +%R 30 1 MN-900 Complete TT_FinMile TK_NotStart 0 2026-06-30 00:00 2026-06-30 00:00 0 +%T TASKPRED +%F task_pred_id task_id pred_task_id pred_type lag_hr_cnt +%R 1 20 10 PR_FS 0 +%R 2 30 20 PR_FS 0 diff --git a/tests/real-cases/README.md b/tests/real-cases/README.md new file mode 100644 index 0000000..32bf1bb --- /dev/null +++ b/tests/real-cases/README.md @@ -0,0 +1,13 @@ +# Real-case regression results + +Regenerated by `node --test tests/real-cases/real-cases.test.mjs -- --write`. + +| id | title | kind | expect contradiction | result | days moved | +|---|---|---|---|---|---| +| northstar | Northstar fixture | real | yes | pass | 73 | +| land-istar-2025-2026 | Land ISTAR 2025→2026 | real | yes | pass | 1949 | +| e7-wedgetail-2025-2026 | E7 Wedgetail 2025→2026 | real | yes | pass | 913 | +| e7-wedgetail-2021-2022 | E7 Wedgetail 2021→2022 stated correction | real | no | pass | 336 | +| r1-airport-stable | R1 Terminal 2 synthetic update, stable narrative | real | yes | pass | 28 | +| crossrail-c1-tfl-jan2018 | Crossrail C1 TfL Board Jan 2018 | reconstructed | yes | pass | 388 | + diff --git a/tests/real-cases/cases.mjs b/tests/real-cases/cases.mjs new file mode 100644 index 0000000..1f78f97 --- /dev/null +++ b/tests/real-cases/cases.mjs @@ -0,0 +1,72 @@ +// Public / OGL tuning cases. Paths resolve under the sibling research_notes folder +// or under this repo. Missing optional real-xer files are skipped (see download script). +import path from "node:path"; +import { fileURLToPath } from "node:url"; + +const __dirname = path.dirname(fileURLToPath(import.meta.url)); +export const REPO = path.resolve(__dirname, "../.."); +export const RESEARCH = path.resolve(REPO, "../research_notes/Real case tests/projectlens-inputs"); + +export const CASES = [ + { + id: "northstar", + title: "Northstar fixture", + source: "Repo synthetic demo", + kind: "real", + previous: path.join(REPO, "docs/demo/northstar-previous.xer"), + current: path.join(REPO, "docs/demo/northstar-current.xer"), + narrative: path.join(REPO, "docs/demo/northstar-narrative.txt"), + expect: { contradiction: true, daysMoved: 73 }, + }, + { + id: "land-istar-2025-2026", + title: "Land ISTAR 2025→2026", + source: "GMPP / NISTA (OGL)", + kind: "real", + previous: path.join(RESEARCH, "gmpp-xer/MOD_0056_2122-Q3_2025-2026/previous.xer"), + current: path.join(RESEARCH, "gmpp-xer/MOD_0056_2122-Q3_2025-2026/current.xer"), + narrative: path.join(RESEARCH, "gmpp-xer/MOD_0056_2122-Q3_2025-2026/narrative.txt"), + expect: { contradiction: true, daysMoved: 1949 }, + }, + { + id: "e7-wedgetail-2025-2026", + title: "E7 Wedgetail 2025→2026", + source: "GMPP / NISTA (OGL)", + kind: "real", + previous: path.join(RESEARCH, "gmpp-xer/MOD_0120_2021-Q2_2025-2026/previous.xer"), + current: path.join(RESEARCH, "gmpp-xer/MOD_0120_2021-Q2_2025-2026/current.xer"), + narrative: path.join(RESEARCH, "gmpp-xer/MOD_0120_2021-Q2_2025-2026/narrative.txt"), + expect: { contradiction: true, daysMoved: 913 }, + }, + { + id: "e7-wedgetail-2021-2022", + title: "E7 Wedgetail 2021→2022 stated correction", + source: "GMPP / NISTA (OGL)", + kind: "real", + // Built on the fly from gmpp_pairs when the xer folder is absent for this year pair. + pairFilter: { id: "MOD_0120_2021-Q2", prevYear: 2021, year: 2022 }, + expect: { contradiction: false, daysMoved: 336 }, + }, + { + id: "r1-airport-stable", + title: "R1 Terminal 2 synthetic update, stable narrative", + source: "XER-Splitter airport.xer + synthetic edit", + kind: "real", + previous: path.join(RESEARCH, "variants/R1-airport-terminal2/previous.xer"), + current: path.join(RESEARCH, "variants/R1-airport-terminal2/current.xer"), + narrative: path.join(RESEARCH, "narratives/r1-stable.txt"), + expect: { contradiction: true, daysMoved: 28 }, + optional: true, + }, + { + id: "crossrail-c1-tfl-jan2018", + title: "Crossrail C1 TfL Board Jan 2018", + source: "Reconstructed from NAO / London Assembly (public)", + kind: "reconstructed", + previous: path.join(RESEARCH, "crossrail/C1-feb2018-handover-vs-contractor-programmes/previous.xer"), + current: path.join(RESEARCH, "crossrail/C1-feb2018-handover-vs-contractor-programmes/current.xer"), + narrative: path.join(RESEARCH, "crossrail/narratives/tfl-board-2018-01-30.txt"), + expect: { contradiction: true }, + optional: true, + }, +]; diff --git a/tests/real-cases/real-cases.test.mjs b/tests/real-cases/real-cases.test.mjs new file mode 100644 index 0000000..f78c450 --- /dev/null +++ b/tests/real-cases/real-cases.test.mjs @@ -0,0 +1,122 @@ +// Public real-case regression suite. Regenerates README.md with --write. +import assert from "node:assert/strict"; +import fs from "node:fs"; +import path from "node:path"; +import { createRequire } from "node:module"; +import { describe, it } from "node:test"; +import { CASES, REPO, RESEARCH } from "./cases.mjs"; + +const require = createRequire(import.meta.url); +const engine = require(path.join(REPO, "docs/engine/projectlens-engine.js")); +const writeMode = process.argv.includes("--write") || process.env.WRITE_REAL_CASES === "1"; +const results = []; + +function xerFromPair(pair) { + const dataDate = year => `${year}-03-31 00:00`; + return (end, year, label) => [ + "ERMHDR\t20.12\t" + `${year}-03-31` + "\tProject\tadmin\tGMPP adapter\tdbxDatabaseNoName\tProject Management\tGBP", + "%T\tPROJECT", + "%F\tproj_id\tproj_short_name\tscd_end_date\tlast_recalc_date", + `%R\t${pair.id}\t${pair.id}\t${end} 00:00\t${dataDate(year)}`, + "%T\tTASK", + "%F\ttask_id\tproj_id\ttask_code\ttask_name\ttask_type\tstatus_code\ttotal_float_hr_cnt\tearly_end_date", + `%R\t1\t${pair.id}\tEND\tPublished project end date\tTT_FinMile\tTK_NotStart\t0\t${end} 00:00`, + "", + ].join("\r\n"); +} + +function loadPairNarrative(caseDef) { + if (caseDef.pairFilter) { + const pairsPath = path.join(RESEARCH, "gmpp_pairs.json"); + if (!fs.existsSync(pairsPath)) return null; + const pairs = JSON.parse(fs.readFileSync(pairsPath, "utf8")); + const pair = pairs.find(p => + p.id === caseDef.pairFilter.id + && p.prevYear === caseDef.pairFilter.prevYear + && p.year === caseDef.pairFilter.year, + ); + if (!pair) return null; + const make = xerFromPair(pair); + return { + previousText: make(pair.prevEnd, pair.prevYear), + currentText: make(pair.curEnd, pair.year), + narrative: pair.narrative, + previousName: "previous.xer", + currentName: "current.xer", + }; + } + const needed = [caseDef.previous, caseDef.current, caseDef.narrative]; + if (needed.some(p => !p || !fs.existsSync(p))) return null; + return { + previousText: fs.readFileSync(caseDef.previous, "utf8"), + currentText: fs.readFileSync(caseDef.current, "utf8"), + narrative: fs.readFileSync(caseDef.narrative, "utf8"), + previousName: path.basename(caseDef.previous), + currentName: path.basename(caseDef.current), + }; +} + +function runCase(caseDef) { + const loaded = loadPairNarrative(caseDef); + if (!loaded) { + return { skipped: true, reason: "fixture absent" }; + } + const previous = engine.parseXerAssurance(loaded.previousText, loaded.previousName); + const current = engine.parseXerAssurance(loaded.currentText, loaded.currentName); + const review = engine.analyseReview(previous, current, loaded.narrative.trim(), { confirmedMatch: true }); + const contradiction = review.blockers.some(b => b.type === "Contradiction"); + return { + skipped: false, + contradiction, + daysMoved: review.finishMovement, + blockers: review.blockers.map(b => b.type), + }; +} + +describe("public real-case regression", () => { + for (const caseDef of CASES) { + it(caseDef.title, () => { + const actual = runCase(caseDef); + if (actual.skipped) { + if (caseDef.optional || caseDef.pairFilter) { + results.push({ ...caseDef, status: "skipped", detail: actual.reason }); + return; + } + assert.fail(`Required fixture missing for ${caseDef.id}`); + } + const okContradiction = actual.contradiction === caseDef.expect.contradiction; + const okDays = caseDef.expect.daysMoved === undefined + || actual.daysMoved === caseDef.expect.daysMoved; + results.push({ + ...caseDef, + status: okContradiction && okDays ? "pass" : "fail", + actualContradiction: actual.contradiction, + actualDaysMoved: actual.daysMoved, + }); + assert.equal(actual.contradiction, caseDef.expect.contradiction, `${caseDef.id} contradiction`); + if (caseDef.expect.daysMoved !== undefined) { + assert.equal(actual.daysMoved, caseDef.expect.daysMoved, `${caseDef.id} daysMoved`); + } + }); + } + + it("optionally writes the results table", () => { + if (!writeMode) return; + const lines = [ + "# Real-case regression results", + "", + "Regenerated by `node --test tests/real-cases/real-cases.test.mjs -- --write`.", + "", + "| id | title | kind | expect contradiction | result | days moved |", + "|---|---|---|---|---|---|", + ...results.map(row => { + const expect = row.expect?.contradiction ? "yes" : "no"; + const result = row.status; + const days = row.actualDaysMoved ?? row.expect?.daysMoved ?? ""; + return `| ${row.id} | ${row.title} | ${row.kind} | ${expect} | ${result} | ${days} |`; + }), + "", + ]; + fs.writeFileSync(path.join(REPO, "tests/real-cases/README.md"), `${lines.join("\n")}\n`); + }); +});